Loading...
HomeMy WebLinkAbout07-22-2026 Board Meeting Complete Agenda PacketNOTICE OF REGULAR MEETING AGENDA PUBLIC PARTICIPATION NOTICE ORANGE COUNTY SANITATION DISTRICT BOARD OF DIRECTORS JULY 22, 2026 - 6:00 PM ACCESSIBILITY FOR THE GENERAL PUBLIC Your participation is always welcome. OC San offers several ways in which to interact during this meeting. MEETING PARTICIPATION INSTRUCTIONS www.ocsan.gov IN-PERSON MEETING ATTENDANCE OC San Headquarters: 18480 Bandilier Circle, Fountain Valley, CA 92708 ONLINE MEETING PARTICIPATION Join the meeting now PARTICIPATE BY TELEPHONE Dial: (213) 279-1455 Phone Conference ID: 881 395 579# WATCH THE MEETING ONLINE https://ocsd.legistar.com/Calendar.aspx Details on how to participate can be found on our website at Join the live meeting on Teams: The meeting will be available for online viewing at: For any questions and/or concerns, please contact the Clerk of the Board’s office at 714-593-7433. Thank you for your interest in OC San! SUBMIT A COMMENT Online at: https://ocsd.legistar.com/Calendar.aspx or by emailing: OCSanClerk@ocsan.gov BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 - 6:00 PM Headquarters - Board Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 ACCOMMODATIONS FOR THE DISABLED: If you require any special disability related accommodations, please contact the Orange County Sanitation District (OC San) Clerk of the Board’s office at (714) 593-7433 at least 72 hours prior to the scheduled meeting. Requests must specify the nature of the disability and the type of accommodation requested. AGENDA DESCRIPTION: The agenda provides a brief general description of each item of business to be considered or discussed. The recommended action does not indicate what action will be taken. The Board of Directors may take any action which is deemed appropriate. MEETING RECORDING: A recording of this meeting is available within 24 hours after adjournment of the meeting at https://ocsd.legistar.com/Calendar.aspx or by contacting the Clerk of the Board. SUBMIT A COMMENT: You may submit your comments and questions in writing in advance of, or during the meeting by using the eComment feature available online at: https://ocsd.legistar.com/Calendar.aspx or by sending them to OCSanClerk@ocsan.gov with the subject line "PUBLIC COMMENT ITEM # [insert relevant item number]" or "PUBLIC COMMENT NON-AGENDA ITEM". All written public comments will be provided to the legislative body and may be read into the record or compiled as part of the record. NOTICE TO DIRECTORS: To place items on the agenda for a Committee or Board Meeting, the item must be submitted to the Clerk of the Board: Kelly A. Lore, MMC, (714) 593-7433 / klore@ocsan.gov at least 14 days before the meeting. For any questions on the agenda, Board members may contact staff at: General Manager: Rob Thompson, rthompson@ocsan.gov / (714) 593 7110 Asst. General Manager: Lorenzo Tyner, ltyner@ocsan.gov / (714) 593 7550 Director of Communications: Jennifer Cabral, jcabral@ocsan.gov / (714) 593 7581 Director of Engineering: Mike Dorman, mdorman@ocsan.gov / (714) 593 7014 Director of Environmental Services: Lan Wiborg, lwiborg@ocsan.gov / (714) 593 7450 Director of Finance: Wally Ritchie, writchie@ocsan.gov / (714) 593 7570 Director of Human Resources: Laura Maravilla, lmaravilla@ocsan.gov / (714) 593 7007 Director of Operations & Maintenance: Riaz Moinuddin, rmoinuddin@ocsan.gov / (714) 593 7269 View Current Board of Directors BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 CALL TO ORDER Board Vice Chairwoman Christine Marick INVOCATION AND PLEDGE OF ALLEGIANCE Director Carlos A. Leon, City of Anaheim ROLL CALL AND DECLARATION OF QUORUM Clerk of the Board PUBLIC COMMENTS: Your participation is always welcome. Specific information as to how to participate in a meeting is detailed in the Special Notice attached to this agenda. In general, OC San offers several ways in which to interact during meetings: you may participate in person, join the meeting live via Teams on your computer or similar device or web browser, join the meeting live via telephone, view the meeting online, and/or submit comments for consideration before or during the meeting. SPECIAL PRESENTATIONS: 1.2026-5022EMPLOYEE SERVICE AWARDS 25-year Service Awards Dindo Carrillo, Regulatory Specialist - Division 650 Originator:Kelly Lore REPORTS: The Board Chairperson and the General Manager may present verbal reports on miscellaneous matters of general interest to the Directors. These reports are for information only and require no action by the Directors. CONSENT CALENDAR: Consent Calendar Items are considered to be routine and will be enacted, by the Board of Directors, after one motion, without discussion. Any items withdrawn from the Consent Calendar for separate discussion will be considered in the regular order of business. 2.2026-4710APPROVAL OF MINUTES RECOMMENDATION: Approve minutes of the Regular meeting of the Board of Directors held June 24, 2026. Originator:Kelly Lore Page 2 of 9 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 Agenda Report 06-24-2026 Board Meeting Minutes Attachments: RECEIVE AND FILE: 3.2026-4686COMMITTEE MEETING MINUTES RECOMMENDATION: Receive and file the following: A. Minutes of the GWRS Committee Meeting held January 12, 2026 B. Minutes of the Steering Committee Meeting held May 27, 2026 C. Minutes of the Operations Committee Meeting held June 3, 2026 D. Minutes of the Administration Committee Meeting held June 10, 2026 Originator:Kelly Lore Attachments: 4.2026-4762REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF JUNE 2026 RECOMMENDATION: Receive and file the following: Report of the Investment Transactions for the month of June 2026. Originator:Wally Ritchie Attachments: OPERATIONS COMMITTEE: 5.2026-5009COMBINATION SEWER CLEANING TRUCK REFURBISHMENT RECOMMENDATION: A. Approve a Sole Source Purchase Order to Haaker Equipment Company to refurbish one Combination Sewer Cleaning Truck for a total amount not to exceed $402,186, not including applicable sales tax and freight; and B. Approve a contingency of $60,328 (15%). Originator:Riaz Moinuddin Page 3 of 9 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 Agenda ReportAttachments: 6.2026-5010GAS COMPRESSOR INTERCOOLERS CRITICAL SPARES RECOMMENDATION: A. Approve a Sole Source Purchase Order to NEAC Compressor Service USA, Inc., for the procurement of two spare intercoolers for digester gas compressors in an amount not to exceed $246,754, not including applicable sales tax and freight; and B. Approve a contingency of $24,675 (10%). Originator:Riaz Moinuddin Attachments: 7.2026-5011ON-CALL CONDITION ASSESSMENT PROGRAM SUPPORT SERVICES, SPECIFICATION NO. S-2026-720BD RECOMMENDATION: A. Approve a Services Contract with Jamison Engineering Contractors, Inc. to provide on-call condition assessment program support services, Specification No. S-2026-720BD, for the period of August 1, 2026, through June 30, 2027, for a total amount not to exceed $1,114,638 with four (4) one-year renewal options; B. Approve an annual increase not to exceed 3.5% of the previous year’s amount; and C. Approve an annual contingency not to exceed 10% of the annual contract amount for all renewal periods. Originator:Mike Dorman Attachments: 8.2026-5012REDHILL RELIEF SEWER RELOCATION AT STATE ROUTE 55, PROJECT NO. FE18-13 RECOMMENDATION: Approve the Second Amendment to Utility Agreement No. OCSD-1005, between the Orange County Sanitation District and the Orange County Transportation Authority, for final reimbursement amount of $4,996,443 for Project No. FE18-13, Redhill Relief Sewer Relocation at State Route 55, in the City of Santa Ana. Originator:Mike Dorman Page 4 of 9 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 Agenda Report Second Amendment OCSD-1005 First Amendment OCSD-1005 Utility Agreement OCSD-1005 Attachments: 9.2026-5013SUPPLEMENTAL ENGINEERING SERVICES, CONTRACT NO. PSA2026-001 RECOMMENDATION: A. Approve Professional Services Agreements to provide Supplemental Engineering Services, Contract No. PSA2026-001, for a three-year period with two one-year renewal options effective October 1, 2026, for a combined total amount not to exceed $55,800,000, initially allocated as follows: ·AECOM Technical Services, Inc. - $27,900,000 ·Jacobs Project Management Co. - $27,900,000; and B. Authorize the General Manager to transfer funds between the two Professional Services Agreements, as needed, to align contract budgets with actual workload distribution, with no increase to the total Board-authorized amount. Originator:Mike Dorman Attachments: ADMINISTRATION COMMITTEE: 10.2026-5015RENEW NUTANIX SOFTWARE SUBSCRIPTION, SPECIFICATION NO. S-2026-731BD RECOMMENDATION: A. Approve a Purchase Order Contract to Saitech Inc. for the Purchase of Nutanix Software, Specification No. S-2026-731BD, for a total amount not to exceed $428,173; and B. Approve a contingency of $42,817 (10%). Originator:Wally Ritchie Attachments: Page 5 of 9 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 11.2026-50162027 BENEFITS INSURANCE RENEWAL RECOMMENDATION: A. Approve the Orange County Sanitation District 2027 Benefits Insurance Renewal with the carriers listed below for an overall not-to-exceed amount of $21,321,535 as specified below: 1.Benefit Coordinators Company (BCC) (medical, dental, vision plans, and Employee Assistance Program [EAP]) - Not to Exceed $18,721,669; 2.Lincoln Financial (basic life, short- and long-term disability) - Not to Exceed $551,619; 3.Lincoln Financial (EMT & Manager disability) - Not to Exceed $36,000; 4.HealthEquity (Health Savings Accounts [HSA]) - Not to Exceed $55,386; 5.Voya (Health Reimbursement Arrangement [HRA]) - Not to Exceed $217,980; 6.WEX (Flexible Spending Accounts [FSA]) - Not to Exceed $11,606; 7.BCC (retiree-paid health premiums, recouped from retirees through monthly payments) - Not to Exceed $711,964; 8.Approve a contingency of $1,015,311 (5%); and B. Authorize the General Manager to revise the carriers within the not-to-exceed amounts listed above for operational efficiency and/or to better meet the needs of the Orange County Sanitation District and participants. Originator:Laura Maravilla Attachments: 12.2026-5017 RECOMMENDATION: A. Approve a Purchase Order Contract to Nth Generation Computing, Inc. for the purchase of the VMware Software Enterprise License Agreement (ELA) Subscription, Specification No. S-2026-732BD, for a five (5)-year term, with a total amount not to exceed $3,565,600 plus applicable sales tax; and B. Approve a contingency in the amount of $356,560 (10%). Originator:Wally Ritchie Attachments: Page 6 of 9 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 13.2026-5018PUBLIC AFFAIRS STRATEGIC PLAN FOR FISCAL YEARS 2024-2026 SUMMARY RECOMMENDATION: Receive and file the Public Affairs Strategic Plan for Fiscal Years 2024-2026 Summary. Originator:Jennifer Cabral Attachments: 14.2026-5019LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF JUNE 2026 RECOMMENDATION: Receive and file the Legislative Affairs Update for the month of June 2026. Originator:Jennifer Cabral Attachments: 15.2026-5020WASTEWATER REFUNDING REVENUE OBLIGATIONS, SERIES 2026A RECOMMENDATION: Authorize the General Manager to issue fixed rate Certificates of Participation, to be referred to as Wastewater Refunding Revenue Obligations, in an amount sufficient to refund up to $50,700,000 of Wastewater Refunding Revenue Obligations, Series 2017A. Originator:Wally Ritchie Attachments: STEERING COMMITTEE: None. Page 7 of 9 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 NON-CONSENT: 16.2026-5023GENERAL MANAGER’S COMPENSATION AND BENEFITS RECOMMENDATION: Adopt Resolution No. OC SAN 26-11 titled: “A Resolution of the Board of Directors of the Orange County Sanitation District approving salary adjustments for the General Manager for Fiscal Year 2026/2027.” The changes consist of a salary increase and corresponding range adjustment of 4.5%, effective in the first pay period of July 2026. Originator:Laura Maravilla Attachments: INFORMATION ITEMS: None. AB 1234 DISCLOSURE REPORTS: This item allows Board members to provide a brief oral report regarding the disclosure of outside committees, conferences, training, seminars, etc. attended at the Agency’s expense, per Government Code §53232.3(d). • Report from Board Delegate - ISDOC • Report from Board Delegate - NWRI • Report from Board Delegate - OCCOG • Report from Board Delegate - SARFPA • Report from GWRS Steering Committee Member(s) • Other CLOSED SESSION: None. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: At this time Directors may request staff to place an item on a future agenda. Page 8 of 9 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026 ADJOURNMENT Adjourn the Board meeting until the Regular Meeting of the Board of Directors on August 26, 2026 at 6:00 p.m. AFFIDAVIT OF POSTING: I hereby certify under penalty of perjury and as required by the State of California, Government Code § 54954.2(a), that the foregoing Agenda was posted online at www.ocsan.gov, in the lobby, and outside the main door of Orange County Sanitation District Headquarters at 18480 Bandilier Cir. Fountain Valley, CA 92708 not less than 72 hours prior to the meeting date and time above. All public records relating to each agenda item, including those distributed less than 72 hours prior to the meeting to a majority of the Board of Directors, are available for public inspection with the Clerk of the Board. /s/ Kelly A. Lore, MMC Clerk of the Board July 15, 2026 Page 9 of 9 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4710 Agenda Date:7/22/2026 Agenda Item No:2. FROM:Robert Thompson, General Manager Originator: Kelly A. Lore, Clerk of the Board SUBJECT: APPROVAL OF MINUTES GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve minutes of the Regular meeting of the Board of Directors held June 24, 2026. BACKGROUND In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting will be provided to the Directors for subsequent approval at the following meeting. RELEVANT STANDARDS ·Resolution No. OC SAN 26-02 ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·June 24, 2026 Board of Directors meeting minutes Orange County Sanitation District Printed on 7/14/2026Page 1 of 1 powered by Legistar™ ORANGE COUNTY SANITATION DISTRICT MINUTES BOARD OF DIRECTORS JUNE 24, 2026 Headquarters - Board Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 BOARD OF DIRECTORS Minutes June 24, 2026 CALL TO ORDER: A regular meeting of the Board of Directors of the Orange County Sanitation District was called to order by Board Vice Chairman Jon Dumitru on Wednesday, June 24, 2026 at 6:03 p.m. in the Orange County Sanitation District Headquarters. Director John Withers delivered the invocation and led the Pledge of Allegiance. ROLL CALL AND DECLARATION OF QUORUM: The Clerk of the Board declared a quorum present as follows: PRESENT:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; Belen Carrillo; Jackie Castro; Sam Choi; Daisy Covarrubias; Don Cutler; Thys DeVries; Martin Dix; Justin Fenton; Al Garcia; David Haug; Mark Kawamoto; Joe Manzella; Tom Meregillano; Rob Michaels; Nicholas Oswald; Aldwin Ramirez; Thomas Vu; and Kevin Work were present in the Board Room. OTHERS PRESENT: Scott Smith General Counsel; and Michael Valdez, Special Counsel, Woodruff & Smart were present in the Board Room. PUBLIC COMMENTS: Public Comment was received from Ted Beresford, 16521 Rhone Lane, Huntington Beach, who spoke in opposition of the construction activities on Rhone Lane. SPECIAL PRESENTATIONS: 1.EMPLOYEE SERVICE AWARDS 2026-4971 Originator: Kelly Lore Page 1 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 Administration Committee Chair Christine Marick recognized Senior Environmental Specialist Rob Gamber, who was not in attendance, for his 20 years of service. 20-year Service Awards Rob Gamber, Senior Environmental Specialist - Division 630 Joe Manzella, Environmental Supervisor - Division 630 Nick Oswald, Maintenance Manager - Division 820 REPORTS: Vice Chair Dumitru announced that OC San’s Administrative Offices would be closed on Friday, July 3rd in observance of Independence Day. Vice Chair Dumitru reported the following Committee Appointments which become effective July 1, 2026: ·Jamie Valencia - Administration Committee Chairperson and Steering Committee Member ·Jose Medrano - Administration Committee Vice-Chairperson ·Board Vice Chairwoman Christine Marick - Audit Ad Hoc Committee Member ·Ryan Gallagher - Operations Committee, GWRS Committee and Steering Committee member. Vice Chair Dumitru also announced that John Withers would step down from the Steering Committee and thanked him for his service of over 16 years. Lastly, Vice Chair Dumitru announced that the Directors and Alternate Directors would receive talking points highlighting OC San activities to assist in reporting to their agencies on OC San outreach efforts. General Manager Thompson reported on the recent OC San All hands meetings where fiscal year-end and upcoming fiscal year updates were provided. Mr. Thompson thanked new incoming Board Chairman Jon Dumitru for attending and expressing his appreciation to staff on behalf of the Board. Mr. Thompson reported on his recent speaking engagements with: CASA Partnering for Impact; SCCWRP Commission Meeting; NWRI Board Meeting; MWDOC Water Policy Forum; Fullerton State of the City; and tours with the cities of: Yorba Linda Water District, Irvine and Tustin. Mr. Thompson also announced that OC San had received the American INHOUSE Design Awards for the OC San Annual Report and the Santa Ana Truck Sewer Rehab project movie poster promo. Mr. Thompson provided a brief report on the General Manager’s Fiscal Year 2025-2026 Work Plan Year-End Report; and the new General Manager’s FY 2026-2027 Work Plan. CONSENT CALENDAR: 2.APPROVAL OF MINUTES 2026-4709 Originator: Kelly Lore Page 2 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 MOVED, SECONDED, AND DULY CARRIED TO: Approve minutes of the Regular meeting of the Board of Directors held May 27, 2026. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None RECEIVE AND FILE: 3.COMMITTEE MEETING MINUTES 2026-4685 Originator: Kelly Lore WITHOUT OBJECTION ACTION TAKEN TO RECEIVE AND FILE THE FOLLOWING: A. Minutes of the Steering Committee Meeting held April 22, 2026 B. Minutes of the Operations Committee Meeting held May 6, 2026 C. Minutes of the Administration Committee Meeting held May 13, 2026 4.REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF MAY 2026 2026-4760 Originator: Wally Ritchie WITHOUT OBJECTION ACTION TAKEN TO RECEIVE AND FILE THE FOLLOWING: Report of the Investment Transactions for the month of May 2026. OPERATIONS COMMITTEE: 5.HEADWORKS STANDBY GENERATOR NO. 1 AND EPSA STANDBY GENERATOR NO. 3 RADIATOR REPLACEMENTS AT PLANT NO. 2 (MP2-029), SPECIFICATION NO. S-2026-722BD 2026-4963 Originator: Riaz Moinuddin MOVED, SECONDED, AND DULY CARRIED TO: Page 3 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 A. Approve a General Services Contract to Minako America Corporation DBA Minco Construction, for Headworks Standby Generator No. 1 and EPSA Standby Generator No. 3 Radiator Replacements at Plant No. 2 (MP2-029), Specification No. S-2026-722BD, for a total amount not to exceed $474,000; and B. Approve a contingency of $47,400 (10%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 6.CENGEN INSTRUMENT AIR COMPRESSORS REPLACEMENT AT PLANT NO. 1, PROJECT NO. FE18-06 2026-4964 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: A. Receive and file Bid Tabulation and Recommendation for CenGen Instrument Air Compressors Replacement at Plant No. 1, Project No. FE18-06; B. Award a Construction Contract Agreement to LEED Electric, Inc., for CenGen Instrument Air Compressors Replacement at Plant No. 1, Project No. FE18-06, for a total amount not to exceed $911,678; and C. Approve a contingency of $91,168 (10%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None Page 4 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 7.ENGINEERING PROGRAM CONTRACT PERFORMANCE REPORT 2026-4965 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Engineering Program Contract Performance Report for the period ending March 31, 2026. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 8.FULLERTON-PLACENTIA SEWER FACILITIES DEMOLITION AND REHABILITATION, PROJECT NO. 2-73 2026-4966 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Professional Design Services Agreement with Kleinfelder, Inc., to provide engineering services for Fullerton-Placentia Sewer Facilities Demolition and Rehabilitation, Project No. 2-73, for an amount not to exceed $2,487,429; and B. Approve a contingency of $248,743 (10%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 9.GISLER-RED HILL INTERCEPTOR AND BAKER FORCE MAIN REHABILITATION, PROJECT NO. 7-65 2026-4967 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: Page 5 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 Approve a Contingency Increase of $ 296,538 (30%) to the existing Professional Construction Services Agreement with CDM Smith, Inc. to provide construction support services for Gisler-Red Hill Interceptor and Baker Force Main Rehabilitation, Project No. 7-65, for a new total contingency amount of $395,384 (40%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 10.VALVE REPLACEMENTS AND WET WELL ACCESS IMPROVEMENTS AT SLATER PUMP STATION, PROJECT NO. FRC-0017 2026-4968 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: A. Receive and file Bid Tabulation and Recommendation for Valve Replacements and Wet Well Access Improvements at Slater Pump Station, Project No. FRC-0017; B. Award a Construction Contract Agreement to Steve P. Rados, Inc., for Valve Replacements and Wet Well Access Improvements at Slater Pump Station, Project No. FRC-0017, for a total amount not to exceed $2,624,000; and C. Approve a contingency of $262,400 (10%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None Page 6 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 ADMINISTRATION COMMITTEE: 11.GANN APPROPRIATIONS LIMIT FOR FISCAL YEAR 2026-27 2026-4978 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Adopt Resolution No. OC SAN 26-08, titled: “A Resolution of the Board of Directors of the Orange County Sanitation District Establishing the Annual Appropriations Limit for Fiscal Year 2026-27 for the Orange County Sanitation District in Accordance with the Provisions of Division 9 of Title 1 of the California Government Code”. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 12.FY 2026-27 USE CHARGES FOR SANTA ANA WATERSHED PROJECT AUTHORITY 2026-4979 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Adopt Resolution No. OC SAN 26-09, titled: “A Resolution of the Board of Directors of the Orange County Sanitation District Establishing Use Charges for the 2026-27 Fiscal Year Pursuant to the Wastewater Treatment and Disposal Agreement with the Santa Ana Watershed Project Authority (“SAWPA”)”. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None Page 7 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 13.SOLARWINDS SOFTWARE LICENSE AND SUPPORT AGREEMENT RENEWAL 2026-4980 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Purchase Order Contract to Insight Public Sector Inc. for the purchase of the Solarwinds Software License and Support Agreement Renewal for a three (3) year term using the Omnia Partners (COOB COUNTY) IT Products and Services (23-6692-03), for a total amount not to exceed $211,465.60 plus applicable sales tax; and B. Approve a contingency in the amount of $21,147 (10%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 14.SERVICENOW SOFTWARE LICENSE AGREEMENT RENEWAL 2026-4981 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Purchase Order for a one-year contract with Carahsoft for a software license agreement with ServiceNow, utilizing the NASPO ValuePoint Cooperative Purchasing Contract 7-17-70-40-05 for a total amount not to exceed $594,536; and B. Approve a contingency of $59,454 (10%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None Page 8 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 15.INLAND EMPIRE COMPOSTING AUTHORITY (IERCA) AGREEMENT 2026-4982 Originator: Lan Wiborg MOVED, SECONDED, AND DULY CARRIED TO: AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 16.PUBLIC AFFAIRS UPDATE FOR THE MONTH OF MAY 2026 2026-4983 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Public Affairs Update for the month of May 2026. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 17.LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF MAY 2026 2026-4984 Page 9 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Legislative Affairs Update for the month of May 2026. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 18.BIOSOLIDS DEEP WELL INJECTION COMMUNICATIONS CONSULTANT, SPECIFICATION NO. CS-2026-716BD 2026-4986 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Professional Consultant Services Agreement to S. Groner Associates, Inc. (SGA) as a strategic communications consultant for the Biosolids Deep Well Injection Project, Specification No. CS-2026-716BD for a total amount not to exceed $903,421 for a three (3) year Agreement with two (2) one-year renewal options; B. Approve a contingency of $90,342 (10%); and C. Approve an optional one time add on of $61,436 for the STEM-Integrated Schools Outreach Program. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 19.REMOVALS TO THE PRE-APPROVED ORIGINAL EQUIPMENT MANUFACTURER (OEM) SOLE SOURCE LIST 2026-4987 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Page 10 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 Approve the following removals to the pre-approved OEM Sole Source List: ·Aanderaa Data Instruments - Current meters ·Additel Corporation - Digital Pressure Test Gauges for Bay Bridge Pump Station ·Alhambra Foundry - Manhole Frames & Covers ·Altronic - CenGen Engine Ignition Subsystem Components ·Ameron - Manhole Toppers ·AM-Liner - Sewer Lining ·Arc Wireless - Paging Services ·Ashbrook (Bellmer/Winkler) - Sludge belt filter presses ·Basler - Electrical protective relays and regulators ·BR Frost Company - Jaw Clutch Assemblies ·CECO Fybroc - Pumps and Parts ·Chemineer/NOV - Mixers ·Chevrolet - Trunk Engine Replacements ·Chevron - Chevron 5200 HDAX Low Ash 40 Lubricating Oil ·Cla-Val - Reclaim Plant water backup for plant water system ·Cleaver-Brooks - Burner elements ·CSI/Emerson - MSP vibrations ·Dr. Kristy Forsgren - Fish Liver Histopathology Analysis and Reporting ·Eaton - Self-Cleaning Strainers ·Eaton - Variable frequency drives for process pumps ·Electrabond - coating of belt filter press rollers ·Enfotech - Pre-Treatment Software ·Essco - Submersible Pumps ·Evident Scientific, Inc. - Olympus IPLEX GX Videoscope and related accessories ·First American Real Estate - Online geographic realquest report ·Ford Hall Company, Inc. - Weir Wolf/Algae Sweep Automation Cleaning Equipment Parts and Service ·Gates Fiberglass Installers - On-site/Field Fiberglass tank and ducting repairs ·GE Inspection ·Golden Bell - Insect Control ·Gooch Thermal Systems, Inc. - Spiral Heat Exchangers ·Graham Corporation - Liquid Ring Pumps ·Groth Corporation - Flame Arrestors and Parts ·Guidance Software, Inc. - e-Discovery software ·Howden Roots/Turblex - Aeration blowers service ·Hydro Gate - Weir Gates & Parts ·Innovyze, Inc. - Hydraulic Monitoring and CCTV Data ·Integrated Turbo Machinery - Maintenance, repairs and service of steam turbine multi-stage rotor ·Interscan/Gas Detection - 2 Point H2S Monitoring Systems ·Iopredict Inc. - Test validation for Lead Instrumentation, Instrumentation Techs 1 & Page 11 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 II ·ITT Standard - Heat exchangers ·LECO - GC Time of Flight mass spectrometer ·M.K. Plastics Corporation - Flex connectors for foul air fans ·Marlow - Process Pumps ·McCrometer - MW510 Flowmeters ·Met-Pro Technologies dba HEE/DUALL - Trickling Filter Fans ·Midway Manufacturing & Machine - Custom brackets & fittings for vehicles/electric carts and portable equipment ·Milton Roy - Pumps and Equipment ·Mobius Institute - Mobius iLearnReliability Enterprise Training Product ·Monterey Bay Aquarium Research Institute (MBARI) - Ocean Mooring Support ·Motorola, Inc. - Radios ·Moyno - Process Pumps ·Moyno - Pumps, Parts and Grinders ·Newport Dunes Resort and Marina - Marina Lease for Ocean Monitoring Program (OMP) Vessel ·Nixon-Egli Equipment Co. - Modifications and Custom Equipment Installation on Welder Service Truck ·Noria - Lube Awareness Training ·Nuttal Gear - Gear Drive Assembly and Related Parts/Equipment ·Oceco - Flame Arrestors on Digesters ·Orange County Muffler - Bumper Mounted Tire Recovery System ·Orange County Sheriff’s Department - Law Enforcement & Security Services ·Parkson - Washer Compactor ·Perkin Elmer - ICP Mass Spectrometer ·Philadelphia Mixing Solutions LLC - Parts for rebuild and repairs of gearbox for Aeration Basins ·PlanetBids, Inc. - Online vendor and bid management ·Prominent Fluid Controls/PFC - Process metering pumps and drive assemblies ·Pulsafeeder - Ferric injection pumps ·Pulsafeeder - Pulsafeeder Engineered products and replacement parts for chemical pump station ·Rand McNally - Thomas Bros Maps ·RBMWare - Software and 2310 vibration analyzers ·RBR - Electronic Water Quality Sensors ·Retrofit Services Company - HVAC Controls System Maintenance ·Rincon Truck Center - Diagnostics and Repairs of Diesel Engine Trucks ·Robicon - Variable frequency drives for pumps ·Rodney Hunt, Inc. - Diversion Gates and Actuators ·Saft America - UPS Batteries ·Sancon 100 Epoxy/Urethane - Coating System ·SANS - Vouchers for Cyber Security Training ·Schweitzer Engineering Laboratories - Equipment, materials, and services for Page 12 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 electrical power system protective relays and load-shedding systems. ·SDT Ultrasound Solutions - SDT Ultrasound instruments, hardware and software ·Siemens Building Management System - Maintenance tech training for HVAC and instrumentation departments ·Skalar - BOD Robotics ·Snap-On - Smog Machine Repair Service ·Sonetics - Wireless Headsets and System ·Southern California Coastal Water Research Project (SCCWRP) - Bight ’18 Biological Impacts Assessment ·Sparling Instruments - Process flowmeters ·SPX Flow/Lightnin - Gear Box repair parts, equipment and service ·Sulzer (Formerly ABS) - Pumps and Parts ·Thermo Electron - ICP Atomic Emission Spectrometer and GC Mass Spectrometer ·Tireshark - Traffic spikes ·Titus - Composite Manhole Covers ·Toshiba - HVK Circuit Breakers ·Trident - Actuate Parts and Repairs ·Trimble Water - Trimble Unity Software Licensing and Support ·Turvac - Alignment Certification Training ·Vapex Environmental Technologies - Sentinel Scrubber Monitor/Controller Products ·Vaughan - Pump Maintenance and Parts ·Verderflex ·Vision Internet Solutions - Internet Website ·Waterman Gates - Waterman engineered products, parts & equipment ·Waters Corporation - Liquid chromatograph mass spectrometer ·WSG & Solutions, Inc. - Grit Classifier Repair Parts AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 20.FY 2026-27 PROPERTY-LIABILITY INSURANCE RENEWALS 2026-4988 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Page 13 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 Approve the Orange County Sanitation District FY 2026-27 Property-Liability Insurance Renewals included in the FY 2026-27 and FY 2027-28 Budget for the not-to-exceed amounts specified below: Property and Boiler & Machinery - Not to Exceed $2,870,413 Excess General Liability Insurance - Not to Exceed $1,485,347 Excess Workers’ Compensation Insurance - Not to Exceed $ 518,000 Earthquake Insurance - Not to Exceed $ 166,381 Cyber Liability $ 159,829 TOTAL $5,199,970 AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 21.INVEST AND/OR REINVEST ORANGE COUNTY SANITATION DISTRICT’S FUNDS AND ADOPT INVESTMENT POLICY STATEMENT 2026-4989 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Adopt Resolution No. OC SAN 26-10 entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District, Authorizing the Orange County Sanitation District’s Treasurer to Invest and/or Reinvest the Orange County Sanitation District’s Funds, Adopting the Orange County Sanitation District’s Investment Policy Statement and Performance Benchmarks, and Repealing Resolution No. OC SAN 25-20”. STEERING COMMITTEE: 22.2026-4995 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Page 14 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 Approve and authorize the General Manager to execute the Implementation Agreement between Orange County Sanitation District and Irvine Ranch Water District, in a form approved by General Counsel. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 23.AGREEMENT WITH IRVINE RANCH WATER DISTRICT MOOTING DEFUNCT PRIOR CONTRACTS AND TERMINATING SURVIVAL PROVISIONS 2026-4996 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: Approve and authorize the General Manager to execute the Agreement Mooting Defunct Prior Contracts and Terminating Survival Provisions between Orange County Sanitation District and Irvine Ranch Water District, in a form approved by General Counsel. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 24.GENERAL MANAGER’S FY 2025-2026 WORK PLAN YEAR-END REPORT 2026-4997 Originator: Rob Thompson MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the General Manager’s FY 2025-2026 Work Plan Year-End Report. Page 15 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None 25.GENERAL MANAGER’S FY 2026-2027 WORK PLAN 2026-4998 Originator: Rob Thompson MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the General Manager’s FY2026-2027 Work Plan. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None Vice Chair Dumitru recessed the OC San Board of Directors Meeting at 6:33 p.m. ******************************************************************************************************** Page 16 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION MEETING CALL TO ORDER: Vice Chair Dumitru called the Board of Directors, Orange County Financing Corporation meeting to order at 6:33 p.m. ROLL CALL AND DECLARATION OF QUORUM: Kelly Lore, Secretary of the Financing Corporation, declared a quorum present as follows: PRESENT:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu APPROVAL OF MINUTES FC-1 APPROVAL OF MINUTES - ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION 2026-4972 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Approve Minutes of the Regular meeting of the Orange County Sanitation District Financing Corporation held September 24, 2025. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None Page 17 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 NON-CONSENT: FC-2 2026-4761 Originator: Wally Ritchie Director of Finance Wally Richie provided the annual status report. MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Annual Status Report of the Orange County Sanitation District Financing Corporation. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru, Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren (Alternate) and Ben Wong (Alternate) NOES:None ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu ABSTENTIONS:None ******************************************************************************************************** Page 18 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 Vice Chair Dumitru reconvened the Orange County Sanitation District Board of Directors meeting at 6:36 p.m. NON-CONSENT: 26.PROPOSED FISCAL YEAR 2026-27 AND FISCAL YEAR 2027-28 BUDGET 2026-4990 Originator: Wally Ritchie Mr. Thompson provided a brief overview of the item. MOVED, SECONDED, AND DULY CARRIED TO: FY 2026-27 FY 2027-28 Net Operating $ 279,712,720 $ 291,268,126 Self-Insurance - Workers’ Comp.$ 1,568,000 $ 1,697,500 Self-Insurance - Property & Gen. Liability $ 4,991,970 $ 5,460,167 Net Capital Improvement Program $ 291,475,441 $ 313,540,607 Capital Equipment $ 19,445,729 $ 14,322,073 Debt/COP Service $ 60,972,861 $ 65,127,111 Reduction of Long-Term Liabilities $ 15,000,000 $ 15,000,000 Total $ 673,166,721 $ 706,415,584 INFORMATION ITEMS: None. AB 1234 DISCLOSURE REPORTS: Directors Pat Burns, Andrew Nguyen, and Bob Ooten provided a report on their recent attendance at various Regional Board Meetings. Directors Debbie Baker and John Withers departed the meeting at 6:39 p.m. CLOSED SESSION: CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS 54956.9(d)(1) & 54956.9(d)(2). The Board convened in closed session at 6:39 p.m. Confidential minutes of the Closed Sessions have been prepared in accordance with the above Government Code Sections and are maintained by the Clerk of the Board in the Official Book of Confidential Minutes of Board and Committee Closed Session meetings. Page 19 of 20 BOARD OF DIRECTORS Minutes June 24, 2026 CS-1 CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(1) 2026-4991 CONVENED IN CLOSED SESSION: 30-2024-01379706-CU-OR-CJC. CS-2 CONFERENCE WITH LEGAL COUNSEL RE ANTICIPATED LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(2) 2026-4992 CONVENED IN CLOSED SESSION: Number of Potential Cases: (1) Significant exposure to litigation. RECONVENED IN REGULAR SESSION. The Board reconvened in regular session at 7:22 p.m. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: General Counsel Scott Smith stated there was no reportable action. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: At 7:23 p.m., Vice Chair Dumitru adjourned the meeting until the next Regular Meeting of the Board of Directors to be held on Wednesday, July 22, 2026 at 6:00 p.m. Submitted by: __________________ Kelly A. Lore, MMC Clerk of the Board Page 20 of 20 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4686 Agenda Date:7/22/2026 Agenda Item No:3. FROM:Robert Thompson, General Manager Originator: Kelly A. Lore, Clerk of the Board SUBJECT: COMMITTEE MEETING MINUTES GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the following: A. Minutes of the GWRS Committee Meeting held January 12, 2026 B. Minutes of the Steering Committee Meeting held May 27, 2026 C. Minutes of the Operations Committee Meeting held June 3, 2026 D. Minutes of the Administration Committee Meeting held June 10, 2026 BACKGROUND In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting will be provided to the Directors for subsequent approval at the following meeting. RELEVANT STANDARDS ·Resolution No. OC SAN 24-09 ADDITIONAL INFORMATION The minutes of the Committee meetings are approved at their respective Committees and brought forth to the Board of Directors for receive and file only. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Minutes of the Monthly Committee Meetings Orange County Sanitation District Printed on 7/13/2026Page 1 of 1 powered by Legistar™ MINUTES OF THE MEETING GROUNDWATER REPLENISHMENT SYSTEM STEERING COMMITTEE Monday, January 12, 2026 OC San Director Gallagher called the Groundwater Replenishment System Steering Committee meeting to order in the OCWD Boardroom. Public access was also provided via Zoom webinar. Following the Pledge of Allegiance to the flag, the Secretary called the roll and reported a quorum. OCWD Staff OC SAN Staff John Kennedy, Mehul Patel, Gina Ayala, Leticia Villarreal Robert Thompson, Jennifer Cabral Annual Reorganization of GWRS Steering Committee Officers GWRS Steering Committee member Ryan Gallagher stated the Steering Committee reorganizes on an annual basis. It was a consensus of the Committee members present to approve the following nomination: 2026 GWRS Steering Committee Chair OCWD Director Cathy Green 2026 GWRS Steering Committee Vice Chair OC San Director Jon Dumitru Director Green conducted the remainder of the meeting. CONSENT CALENDAR The Consent Calendar was moved, seconded and duly carried [5-0] as follows. Yes Gallagher, Green, Wanke, Dumitru, Yoh 1. Minutes of Previous Meeting The minutes of the GWRS Steering Committee meeting held July 14, 2025, are approved as presented. INFORMATIONAL ITEMS 3. GWRS Operations Update Executive Director of Operations Mehul Patel reported that the daily production for the quarter, October to December 2025, was 105 110 mgd. He stated that production was limited during Committee Members Ryan Gallagher Cathy Green Chad Wanke Denis Bilodeau (absent) Jon Dumitru Van Tran Alternates Roger Yoh Bob Ooten Dina Nguyen (absent) Andrew Nguyen Fred Jung Pat Burns *OCWD Director Erik Weigand was also in attendance 2 this period due to rehab of product water pump A01. He reported that high groundwater levels limited injection flows to seawater intrusion barrier and mid-basin well. 3. GWRS Fourth Quarter Outreach Report (October December 2025) Director of Public Affairs Gina Ayala reported that for the fourth quarter of 2025 a total of 33 GWRS tours were conducted accounting for 760 guests. She reported that OCWD received the Sustainable Water Utility Management Award from the Association of Metropolitan Water Agencies for leadership in sustainable water management, including operation of the Groundwater Replenishment System. ADJOURNMENT There being no further business to come before the Committee, the meeting was adjourned at 5:22 p.m. OCWD Director Cathy Green, Chair Orange County Sanitation District Minutes for the STEERING COMMITTEE Wednesday, May 27, 2026 5:00 PM Headquarters - Huntington Beach Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Steering Committee of the Orange County Sanitation District was called to order by Board Chairman Ryan Gallagher on Wednesday, May 27, 2026 at 5:00 p.m. in the Orange County Sanitation District Headquarters. ROLL CALL AND DECLARATION OF QUORUM: The Clerk of the Board declared a quorum present as follows: PRESENT:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine Marick, Chad Wanke and John Withers ABSENT:None STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; Daisy Covarrubias; Don Cutler; Thys DeVries; Martin Dix; Justin Fenton; John Frattali; Dave Haug; Rob Michaels; Tania Moore; Becky Polcyn; Aldwin Ramirez; Thomas Vu; Kevin Work; and Ruth Zintzun were present in the Huntington Beach Room. Jacob Dalgoff was present virtually. OTHERS PRESENT: Scott Smith, General Counsel; and Phil Lem, Special Counsel, Payne & Fears were present in the Huntington Beach Room. PUBLIC COMMENTS: None. REPORTS: Chair Gallagher and General Manager Rob Thompson did not provide reports. CONSENT CALENDAR: 1.APPROVAL OF MINUTES 2026-4696 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Page 1 of 5 STEERING COMMITTEE Minutes May 27, 2026 Approve minutes of the Regular meeting of the Steering Committee held April 22, 2026. AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine Marick, Chad Wanke and John Withers NOES:None ABSENT:None ABSTENTIONS:None 2.2026-2029 CONTRIBUTION TO THE CENTER FOR DEMOGRAPHIC RESEARCH 2026-4835 Originator: Mike Dorman Approve and authorize the General Manager to execute a three-year Memorandum of Understanding with California State University Fullerton Auxiliary Services Corporation for the continued operation of the Center for Demographic Research for the period of July 1, 2026 through June 30, 2029, for a total amount not to exceed $243,236. AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine Marick, Chad Wanke and John Withers NOES:None ABSENT:None ABSTENTIONS:None NON-CONSENT: 3.PROPOSED ANNEXATION OF THE TERRITORY OF THE FORMER LOS ALISOS WATER DISTRICT 2026-4896 Originator: Mike Dorman Page 2 of 5 STEERING COMMITTEE Minutes May 27, 2026 A. Authorize staff to take all steps necessary to work with Irvine Ranch Water District and the Orange County Local Agency Formation Commission to bring to effect the annexation of the area serviced by the Los Alisos Water Recycling Plant to Orane County Sanitation District; B. Authorize the General Manager to execute associated Annexation documents in a form approved by General Counsel; and C. Adopt Resolution No. OC SAN 26-XX, entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District authorizing initiation of proceedings and requesting the Orange County Local Agency Formation Commission to undertake proceedings for the Annexation to the Orange County Sanitation District, of territory in the Irvine Ranch Water District”. AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine Marick, Chad Wanke and John Withers NOES:None ABSENT:None ABSTENTIONS:None 4.SUPERCRITICAL WATER OXIDATION DEMONSTRATION AT PLANT NO. 1, PROJECT NO. RE21-01 2026-4942 Originator: Rob Thompson Authorize the General Manager to modify the Professional Services Agreement to 374Water Systems, Inc. for the Supercritical Water Oxidation Demonstration at Plant No. 1, Project No. RE21-01, to reduce the acceptance capacity of the Nix6 system to 3.25 tons per day from 6 tons per day, while 374Water Systems, Inc. continues to make process improvements toward achieving the goal of 6 tons per day. AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine Marick, Chad Wanke and John Withers NOES:None ABSENT:None ABSTENTIONS:None 5.GENERAL MANAGER’S FY 2026-2027 PROPOSED WORK PLAN 2026-4867 Originator: Rob Thompson Page 3 of 5 STEERING COMMITTEE Minutes May 27, 2026 2026-2027 Proposed Work Plan. MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the General Manager’s FY2026-2027 Proposed Work Plan. AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine Marick, Chad Wanke and John Withers NOES:None ABSENT:None ABSTENTIONS:None INFORMATION ITEMS: None. DEPARTMENT HEAD REPORTS: None. CLOSED SESSION: CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS 54956.9(D)(2) & 54956.9(D)(1). CS-1 CONFERENCE WITH LEGAL COUNSEL RE ANTICIPATED LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(2) 2026-4905 CONVENED IN CLOSED SESSION: Number of Potential Cases: 1 Significant exposure to litigation. CS-2 CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(1) 2026-4910 CONVENED IN CLOSED SESSION: Number of Cases: 1 Michael Oberly v. Orange County Sanitation District and Does 1-25, Orange County Superior Court Case No. 30-2025-01489491-CU-OE-CJC. Page 4 of 5 STEERING COMMITTEE Minutes May 27, 2026 RECONVENED IN REGULAR SESSION. The Committee reconvened in regular session at 5:47 p.m. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: General Counsel Scott Smith did not provide a report. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: Chair Gallagher declared the meeting adjourned at 5:48 p.m. to the next Regular Steering Committee meeting to be held on Wednesday, June 24, 2026 at 5:00 p.m. Submitted by: __________________ Kelly A. Lore, MMC Clerk of the Board Page 5 of 5 Orange County Sanitation District Minutes for the OPERATIONS COMMITTEE Wednesday, June 3, 2026 5:00 PM Headquarters - Board Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Operations Committee of the Orange County Sanitation District was called to order by Committee Chairman Pat Burns on Wednesday, June 3, 2026 at 5:00 p.m. in the Orange County Sanitation District Headquarters. Committee Vice Chairman Carlos Leon led the Pledge of Allegiance. ROLL CALL AND DECLARATION OF QUORUM: Assistant Clerk of the Board Tania Moore declared a quorum present as follows: PRESENT:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat, John Withers and Cindy Tran (Alternate) ABSENT:None STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Tania Moore, Assistant Clerk of the Board; Mo Abiodun; Daniel Berokoff; Jon Bradley; Cheri Calisang; Mortimer Caparas; Sam Choi; Raul Cuellar; Don Cutler; Thys DeVries; Martin Dix; Al Garcia; Shannon Garcia; David Haug; Mark Kawamoto; Marianne Kleine; Janet Marroquin; Tom Meregillano; Nasrin Nasrollani; Kelly Newell; Andrew Nguyen; Nick Oswald; Valerie Ratto; Thomas Vu; Todd Waltz; Kevin Work; Sammady Yi; and Ruth Zintzun were present in the Board Room. Rich Leon was present virtually. OTHERS PRESENT: Mal Richardson, General Counsel; was present in the Board Room. PUBLIC COMMENTS: None. REPORTS: Chair Burns and General Manager Rob Thompson did not provide reports. Page 1 of 6 OPERATIONS COMMITTEE Minutes June 3, 2026 CONSENT CALENDAR: 1.APPROVAL OF MINUTES 2026-4723 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Approve minutes of the Regular meeting of the Operations Committee held May 6, 2026. AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Johnathan Ryan Hernandez and Cindy Tran (Alternate) ABSTENTIONS:None 2.HEADWORKS STANDBY GENERATOR NO. 1 AND EPSA STANDBY GENERATOR NO. 3 RADIATOR REPLACEMENTS AT PLANT NO. 2 (MP2-029), SPECIFICATION NO. S-2026-722BD 2026-4922 Originator: Riaz Moinuddin A. Approve a General Services Contract to Minako America Corporation DBA Minco Construction, for Headworks Standby Generator No. 1 and EPSA Standby Generator No. 3 Radiator Replacements at Plant No. 2 (MP2-029), Specification No. S-2026-722BD, for a total amount not to exceed $474,000; and B. Approve a contingency of $47,400 (10%). AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Johnathan Ryan Hernandez and Cindy Tran (Alternate) ABSTENTIONS:None 3.CENGEN INSTRUMENT AIR COMPRESSORS REPLACEMENT AT PLANT NO. 1, PROJECT NO. FE18-06 2022-2464 Originator: Mike Dorman Page 2 of 6 OPERATIONS COMMITTEE Minutes June 3, 2026 A. Receive and file Bid Tabulation and Recommendation for CenGen Instrument Air Compressors Replacement at Plant No. 1, Project No. FE18-06; B. Award a Construction Contract Agreement to LEED Electric, Inc., for CenGen Instrument Air Compressors Replacement at Plant No. 1, Project No. FE18-06, for a total amount not to exceed $911,678; and C. Approve a contingency of $91,168 (10%). AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Johnathan Ryan Hernandez and Cindy Tran (Alternate) ABSTENTIONS:None 4.ENGINEERING PROGRAM CONTRACT PERFORMANCE REPORT 2026-4717 Originator: Mike Dorman Receive and file the Engineering Program Contract Performance Report for the period ending March 31, 2026. AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Johnathan Ryan Hernandez and Cindy Tran (Alternate) ABSTENTIONS:None NON-CONSENT: Alternate Director Cindy Tran arrived at the meeting at 5:07 p.m. 5.FULLERTON-PLACENTIA SEWER FACILITIES DEMOLITION AND REHABILITATION, PROJECT NO. 2-73 2025-4183 Originator: Mike Dorman Page 3 of 6 OPERATIONS COMMITTEE Minutes June 3, 2026 contract negotiations, and the recommendation. MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: A. Approve a Professional Design Services Agreement with Kleinfelder, Inc., to provide engineering services for Fullerton-Placentia Sewer Facilities Demolition and Rehabilitation, Project No. 2-73, for an amount not to exceed $2,487,429; and B. Approve a contingency of $248,743 (10%). AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat, John Withers and Cindy Tran (Alternate) NOES:None ABSENT:Johnathan Ryan Hernandez ABSTENTIONS:None Director Johnathan Ryan Hernandez arrived at the meeting at 5:14 p.m. 6.GISLER-RED HILL INTERCEPTOR AND BAKER FORCE MAIN REHABILITATION, PROJECT NO. 7-65 2026-4925 Originator: Mike Dorman Approve a Contingency Increase of $ 296,538 (30%) to the existing Professional Construction Services Agreement with CDM Smith, Inc. to provide construction support services for Gisler-Red Hill Interceptor and Baker Force Main Rehabilitation, Project No. 7-65, for a new total contingency amount of $395,384 (40%). AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat, John Withers and Cindy Tran (Alternate) NOES:None ABSENT:None ABSTENTIONS:None Page 4 of 6 OPERATIONS COMMITTEE Minutes June 3, 2026 7.VALVE REPLACEMENTS AND WET WELL ACCESS IMPROVEMENTS AT SLATER PUMP STATION, PROJECT NO. FRC-0017 2025-4178 Originator: Mike Dorman A. Receive and file Bid Tabulation and Recommendation for Valve Replacements and Wet Well Access Improvements at Slater Pump Station, Project No. FRC-0017; B. Award a Construction Contract Agreement to Steve P. Rados, Inc., for Valve Replacements and Wet Well Access Improvements at Slater Pump Station, Project No. FRC-0017, for a total amount not to exceed $2,624,000; and C. Approve a contingency of $262,400 (10%). AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat, John Withers and Cindy Tran (Alternate) NOES:None ABSENT:None ABSTENTIONS:None INFORMATION ITEMS: 8.FY 2026-27 AND 2027-28 BUDGET PRESENTATION 2026-4941 Originator: Wally Ritchie Page 5 of 6 OPERATIONS COMMITTEE Minutes June 3, 2026 Information Item. DEPARTMENT HEAD REPORTS: None. CLOSED SESSION: None. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: Chair Burns declared the meeting adjourned at 5:43 p.m. to the next Regular Operations Committee meeting to be held on Wednesday, July 1, 2026 at 5:00 p.m. Submitted by: _____________________ Tania Moore, CMC Assistant Clerk of the Board Page 6 of 6 Orange County Sanitation District Minutes for the ADMINISTRATION COMMITTEE Wednesday, June 10, 2026 5:00 PM Headquarters - Board Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Administration Committee of the Orange County Sanitation District was called to order by Committee Chairwoman Christine Marick on Wednesday, June 10, 2026 at 5:01 p.m. in the Orange County Sanitation District Headquarters. Board Vice Chair Jon Dumitru led the Pledge of Allegiance. ROLL CALL AND DECLARATION OF QUORUM: Assistant Clerk of the Board Tania Moore declared a quorum present as follows: PRESENT:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) ABSENT:None STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Tania Moore, Assistant Clerk of the Board; Mo Abiodun; Jackie Castro; Sam Choi; Daisy Covarrubias; Thys DeVries; Al Garcia; David Haug; Mark Kawamoto; Rebecca Long; Tom Meregillano; Rob Michaels; Aldwin Ramirez; Don Stokes; Thomas Vu; Kevin Work; and Ruth Zintzun were present in the Board Room. OTHERS PRESENT: Scott Smith, General Counsel was present in the Board Room. Eric Sapirstein, ENS Resources was present virtually. PUBLIC COMMENTS: None. REPORTS: Chair Marick announced that OC San Administrative Offices will be closed on Friday, July 3, 2026 in observance of Independence Day. General Manager Rob Thompson did not provide a report. Page 1 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 CONSENT CALENDAR: 1. APPROVAL OF MINUTES 2026-4733 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Approve minutes of the Regular meeting of the Administration Committee held May 13, 2026. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 2. GANN APPROPRIATIONS LIMIT FOR FISCAL YEAR 2026-27 2026-4754 Originator: Wally Ritchie Adopt Resolution No. OC SAN 26-XX, titled: “A Resolution of the Board of Directors of the Orange County Sanitation District Establishing the Annual Appropriations Limit for Fiscal Year 2026-27 for the Orange County Sanitation District in Accordance with the Provisions of Division 9 of Title 1 of the California Government Code”. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 3. FY 2026-27 USE CHARGES FOR SANTA ANA WATERSHED PROJECT AUTHORITY 2026-4759 Originator: Wally Ritchie Page 2 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 Adopt Resolution No. OC SAN 26-XX, titled: “A Resolution of the Board of Directors of the Orange County Sanitation District Establishing Use Charges for the 2026-27 Fiscal Year Pursuant to the Wastewater Treatment and Disposal Agreement with the Santa Ana Watershed Project Authority (“SAWPA”)”. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 4. SOLARWINDS SOFTWARE LICENSE AND SUPPORT AGREEMENT RENEWAL 2026-4902 Originator: Wally Ritchie A. Approve a Purchase Order Contract to Insight Public Sector Inc. for the purchase of the Solarwinds Software License and Support Agreement Renewal for a three (3) year term using the Omnia Partners (COOB COUNTY) IT Products and Services (23-6692-03), for a total amount not to exceed $211,465.60 plus applicable sales tax; and B. Approve a contingency in the amount of $21,147 (10%). AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 5. SERVICENOW SOFTWARE LICENSE AGREEMENT RENEWAL 2026-4924 Originator: Wally Ritchie Page 3 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 A. Approve a Purchase Order for a one-year contract with Carahsoft for a software license agreement with ServiceNow, utilizing the NASPO ValuePoint Cooperative Purchasing Contract 7-17-70-40-05 for a total amount not to exceed $594,536; and B. Approve a contingency of $59,454 (10%). AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 6. INLAND EMPIRE COMPOSTING AUTHORITY (IERCA) AGREEMENT 2026-4920 Originator: Lan Wiborg AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 7. PUBLIC AFFAIRS UPDATE FOR THE MONTH OF MAY 2026 2026-4950 Originator: Jennifer Cabral Page 4 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 Directors to: Receive and file the Public Affairs Update for the month of May 2026. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None NON-CONSENT: Director Chad Wanke left the room at 5:11 p.m. 8. LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF MAY 2026 2026-4940 Originator: Jennifer Cabral Receive and file the Legislative Affairs Update for the month of May 2026. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:Chad Wanke ABSTENTIONS:None Director Wanke returned to the room at 5:16 p.m. 9. BIOSOLIDS DEEP WELL INJECTION COMMUNICATIONS CONSULTANT, SPECIFICATION NO. CS-2026-716BD 2026-4921 Originator: Jennifer Cabral Page 5 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 A. Approve a Professional Consultant Services Agreement to S. Groner Associates, Inc. (SGA) as a strategic communications consultant for the Biosolids Deep Well Injection Project, Specification No. CS-2026-716BD for a total amount not to exceed $903,421 for a three (3) year Agreement with two (2) one-year renewal options; and B. Approve a contingency of $90,342 (10%). C. Approve an optional one time add on of $61,436 for the STEM-Integrated Schools Outreach Program. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 10. REMOVALS TO THE PRE-APPROVED ORIGINAL EQUIPMENT MANUFACTURER (OEM) SOLE SOURCE LIST 2026-4958 Originator: Wally Ritchie Page 6 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 Approve the following removals to the pre-approved OEM Sole Source List: ·Aanderaa Data Instruments - Current meters ·Additel Corporation - Digital Pressure Test Gauges for Bay Bridge Pump Station ·Alhambra Foundry - Manhole Frames & Covers ·Altronic - CenGen Engine Ignition Subsystem Components ·Ameron - Manhole Toppers ·AM-Liner - Sewer Lining ·Arc Wireless - Paging Services ·Ashbrook (Bellmer/Winkler) - Sludge belt filter presses ·Basler - Electrical protective relays and regulators ·BR Frost Company - Jaw Clutch Assemblies ·CECO Fybroc - Pumps and Parts ·Chemineer/NOV - Mixers ·Chevrolet - Trunk Engine Replacements ·Chevron - Chevron 5200 HDAX Low Ash 40 Lubricating Oil ·Cla-Val - Reclaim Plant water backup for plant water system ·Cleaver-Brooks - Burner elements ·CSI/Emerson - MSP vibrations ·Dr. Kristy Forsgren - Fish Liver Histopathology Analysis and Reporting ·Eaton - Self-Cleaning Strainers ·Eaton - Variable frequency drives for process pumps ·Electrabond - coating of belt filter press rollers ·Enfotech - Pre-Treatment Software ·Essco - Submersible Pumps ·Evident Scientific, Inc. - Olympus IPLEX GX Videoscope and related accessories ·First American Real Estate - Online geographic realquest report ·Ford Hall Company, Inc. - Weir Wolf/Algae Sweep Automation Cleaning Equipment Parts and Service ·Gates Fiberglass Installers - On-site/Field Fiberglass tank and ducting repairs ·GE Inspection ·Golden Bell - Insect Control ·Gooch Thermal Systems, Inc. - Spiral Heat Exchangers ·Graham Corporation - Liquid Ring Pumps ·Groth Corporation - Flame Arrestors and Parts ·Guidance Software, Inc. - e-Discovery software ·Howden Roots/Turblex - Aeration blowers service ·Hydro Gate - Weir Gates & Parts ·Innovyze, Inc. - Hydraulic Monitoring and CCTV Data ·Integrated Turbo Machinery - Maintenance, repairs and service of steam turbine multi-stage rotor ·Interscan/Gas Detection - 2 Point H2S Monitoring Systems ·Iopredict Inc. - Test validation for Lead Instrumentation, Instrumentation Techs 1 & Page 7 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 II ·ITT Standard - Heat exchangers ·LECO - GC Time of Flight mass spectrometer ·M.K. Plastics Corporation - Flex connectors for foul air fans ·Marlow - Process Pumps ·McCrometer - MW510 Flowmeters ·Met-Pro Technologies dba HEE/DUALL - Trickling Filter Fans ·Midway Manufacturing & Machine - Custom brackets & fittings for vehicles/electric carts and portable equipment ·Milton Roy - Pumps and Equipment ·Mobius Institute - Mobius iLearnReliability Enterprise Training Product ·Monterey Bay Aquarium Research Institute (MBARI) - Ocean Mooring Support ·Motorola, Inc. - Radios ·Moyno - Process Pumps ·Moyno - Pumps, Parts and Grinders ·Newport Dunes Resort and Marina - Marina Lease for Ocean Monitoring Program (OMP) Vessel ·Nixon-Egli Equipment Co. - Modifications and Custom Equipment Installation on Welder Service Truck ·Noria - Lube Awareness Training ·Nuttal Gear - Gear Drive Assembly and Related Parts/Equipment ·Oceco - Flame Arrestors on Digesters ·Orange County Muffler - Bumper Mounted Tire Recovery System ·Orange County Sheriff’s Department - Law Enforcement & Security Services ·Parkson - Washer Compactor ·Perkin Elmer - ICP Mass Spectrometer ·Philadelphia Mixing Solutions LLC - Parts for rebuild and repairs of gearbox for Aeration Basins ·PlanetBids, Inc. - Online vendor and bid management ·Prominent Fluid Controls/PFC - Process metering pumps and drive assemblies ·Pulsafeeder - Ferric injection pumps ·Pulsafeeder - Pulsafeeder Engineered products and replacement parts for chemical pump station ·Rand McNally - Thomas Bros Maps ·RBMWare - Software and 2310 vibration analyzers ·RBR - Electronic Water Quality Sensors ·Retrofit Services Company - HVAC Controls System Maintenance ·Rincon Truck Center - Diagnostics and Repairs of Diesel Engine Trucks ·Robicon - Variable frequency drives for pumps ·Rodney Hunt, Inc. - Diversion Gates and Actuators ·Saft America - UPS Batteries ·Sancon 100 Epoxy/Urethane - Coating System ·SANS - Vouchers for Cyber Security Training ·Schweitzer Engineering Laboratories - Equipment, materials, and services for Page 8 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 electrical power system protective relays and load-shedding systems. ·SDT Ultrasound Solutions - SDT Ultrasound instruments, hardware and software ·Siemens Building Management System - Maintenance tech training for HVAC and instrumentation departments ·Skalar - BOD Robotics ·Snap-On - Smog Machine Repair Service ·Sonetics - Wireless Headsets and System ·Southern California Coastal Water Research Project (SCCWRP) - Bight ’18 Biological Impacts Assessment ·Sparling Instruments - Process flowmeters ·SPX Flow/Lightnin - Gear Box repair parts, equipment and service ·Sulzer (Formerly ABS) - Pumps and Parts ·Thermo Electron - ICP Atomic Emission Spectrometer and GC Mass Spectrometer ·Tireshark - Traffic spikes ·Titus - Composite Manhole Covers ·Toshiba - HVK Circuit Breakers ·Trident - Actuate Parts and Repairs ·Trimble Water - Trimble Unity Software Licensing and Support ·Turvac - Alignment Certification Training ·Vapex Environmental Technologies - Sentinel Scrubber Monitor/Controller Products ·Vaughan - Pump Maintenance and Parts ·Verderflex ·Vision Internet Solutions - Internet Website ·Waterman Gates - Waterman engineered products, parts & equipment ·Waters Corporation - Liquid chromatograph mass spectrometer ·WSG & Solutions, Inc. - Grit Classifier Repair Parts AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 11. FY 2026-27 PROPERTY-LIABILITY INSURANCE RENEWALS 2026-4755 Originator: Wally Ritchie Page 9 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 Approve the Orange County Sanitation District FY 2026-27 Property-Liability Insurance Renewals included in the FY 2026-27 and FY 2027-28 Budget for the not-to-exceed amounts specified below: Property and Boiler & Machinery - Not to Exceed $2,870,413 Excess General Liability Insurance - Not to Exceed $1,485,347 Excess Workers’ Compensation Insurance - Not to Exceed $ 518,000 Earthquake Insurance - Not to Exceed $ 166,381 Cyber Liability $ 159,829 TOTAL $5,199,970 AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None 12. INVEST AND/OR REINVEST ORANGE COUNTY SANITATION DISTRICT’S FUNDS AND ADOPT INVESTMENT POLICY STATEMENT 2026-4757 Originator: Wally Ritchie Recommend to the Board of Directors to: Adopt Resolution No. OC SAN 26-XX entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District, Authorizing the Orange County Sanitation District’s Treasurer to Invest and/or Reinvest the Orange County Sanitation District’s Funds, Adopting the Orange County Sanitation District’s Investment Policy Statement and Performance Benchmarks, and Repealing Resolution No. OC SAN 25-20”. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None Page 10 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 13. PROPOSED FISCAL YEAR 2026-27 AND FISCAL YEAR 2027-28 BUDGET 2026-4758 Originator: Wally Ritchie FY 2026-27 FY 2027-28 Net Operating $ 279,712,720 $ 291,268,126 Self-Insurance - Workers’ Comp.$ 1,568,000 $ 1,697,500 Self-Insurance - Property & Gen. Liability $ 4,991,970 $ 5,460,167 Net Capital Improvement Program $ 291,475,441 $ 313,540,607 Capital Equipment $ 19,445,729 $ 14,322,073 Debt/COP Service $ 60,972,861 $ 65,127,111 Reduction of Long-Term Liabilities $ 15,000,000 $ 15,000,000 Total $ 673,166,721 $ 706,415,584 AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya Doby (Alternate) NOES:None ABSENT:None ABSTENTIONS:None INFORMATION ITEMS: None. DEPARTMENT HEAD REPORTS: None. Page 11 of 12 ADMINISTRATION COMMITTEE Minutes June 10, 2026 CLOSED SESSION: None. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: Chair Marick declared the meeting adjourned at 5:40 p.m. to the next Regular Administration Committee meeting to be held on Wednesday, July 8, 2026 at 5:00 p.m. Submitted by: _____________________ Tania Moore, CMC Assistant Clerk of the Board Page 12 of 12 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4762 Agenda Date:7/22/2026 Agenda Item No:4. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF JUNE 2026 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the following: Report of the Investment Transactions for the month of June 2026. BACKGROUND The California Government Code requires that a monthly report of investment transactions be provided to the legislative body.Attached is the monthly report of investment transactions for the month ended June 30, 2026. RELEVANT STANDARDS ·Comply with California Government Code Section 53607 PRIOR COMMITTEE/BOARD ACTIONS N/A FINANCIAL CONSIDERATIONS N/A ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Report of the Investment Transactions - June 2026 Orange County Sanitation District Printed on 7/13/2026Page 1 of 1 powered by Legistar™ Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Account Beginning Cash Principal Cash: - 26,869,571.96 Income Cash: 26,869,571.96 Total Cash: - 01-Jun- 26 01-Jun-26 313385XN 1 I 310 INTEREST EARNED ON F H L B DISC NTS 6/01/26 $1 PV ON 218000.0000 SHARES DUE 6/1/2026 218,000 PAR VALUE AT 100 % -----128.98 ---SEI 01-Jun- 26 01-Jun-26 313385XN 1 I 310 INTEREST EARNED ON F H L B DISC NTS 6/01/26 $1 PV ON 3700000.0000 SHARES DUE 6/1/2026 3,700,000 PAR VALUE AT 100 % -----11,501.86 ---SEI 01-Jun- 26 01-Jun-26 313589XN 8 I 310 INTEREST EARNED ON F N M A DISC NT 6/01/26 $1 PV ON 100000.0000 SHARES DUE 6/1/2026 100,000 PAR VALUE AT 100 % -----59.33 ---SEI 01-Jun- 26 01-Jun-26 14912EF 10 I 310 INTEREST EARNED ON CATERPILLAR FINL SVCS C P 6/01/26 $1 PV ON 5025000.0000 SHARES DUE 6/1/2026 5,025,000 PAR VALUE AT 100 % -----7,132.71 ---SEI 01-Jun- 26 01-Jun-26 756109BF 0 I 310 INTEREST EARNED ON REALTY INCOME CORP 4.875% 6/01/26 $1 PV ON 1012000.0000 SHARES DUE 6/1/2026 -----24,667.50 ---SEI 01-Jun- 26 01-Jun-26 3134A1Z 60 I 310 INTEREST EARNED ON F H L M C M T N 6.930% 6/01/26 $1 PV ON 1775000.0000 SHARES DUE 6/1/2026 -----61,503.75 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 1 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 01-Jun- 26 01-Jun-26 369550BN 7 I 310 INTEREST EARNED ON GENERAL DYNAMICS 1.150% 6/01/26 $1 PV ON 1677000.0000 SHARES DUE 6/1/2026 -----9,642.75 ---SEI 01-Jun- 26 01-Jun-26 828807CY 1 I 310 INTEREST EARNED ON SIMON PROPERTY GROUP 3.250% 11/30/26 $1 PV ON 1000000.0000 SHARES DUE 5/30/2026 -----16,250.00 ---SEI 01-Jun- 26 01-Jun-26 P 210 CASH DISBURSEMENT PAID TO ORANGE COUNTY SANITATION DISTRICT OUTGOING DOMESTIC WIRE TRANSFER FROM LIQUID OPERATING PORTFOLIO ------ 40,000,000.00 ---SEI 01-Jun- 26 01-Jun-26 912797UA 3 I 310 INTEREST EARNED ON U S TREASURY BILL 6/16/26 $1 PV ON 600000.0000 SHARES DUE 6/1/2026 600,000 PAR VALUE AT 99.84902167 % -----6,108.28 ---SEI 01-Jun- 26 01-Jun-26 31846V567 FGZXX I 310 INTEREST EARNED ON FIRST AM GOVT OB FD CL Z UNIT ON 0.0000 SHARES DUE 5/31/2026 INTEREST FROM 5/1/26 TO 5/31/26 -----9,825.98 ---SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 756109BF 0 P 20 MATURED PAR VALUE OF REALTY INCOME CORP 4.875% 6/01/26 1,012,000 PAR VALUE AT 100 % - 1,012,000.000 0 100.0 000 ---1,012,000.00 - 1,012,203.47 -203.47 -SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 2 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 01-Jun- 26 01-Jun- 26 01-Jun-26 313385XN 1 P 20 MATURED PAR VALUE OF F H L B DISC NTS 6/01/26 218,000 PAR VALUE AT 100 % -218,000.0000 100.0 000 ---217,871.02 -217,871.02 --SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 14912EF 10 P 20 MATURED PAR VALUE OF CATERPILLAR FINL SVCS C P 6/01/26 5,025,000 PAR VALUE AT 100 % - 5,025,000.000 0 100.0 000 ---5,017,867.29 - 5,017,867.29 --SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 3134A1Z 60 P 20 MATURED PAR VALUE OF F H L M C M T N 6.930% 6/01/26 1,775,000 PAR VALUE AT 100 % - 1,775,000.000 0 100.0 000 ---1,775,000.00 - 1,810,869.85 -35,869.85 -SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 369550BN 7 P 20 MATURED PAR VALUE OF GENERAL DYNAMICS 1.150% 6/01/26 1,677,000 PAR VALUE AT 100 % - 1,677,000.000 0 100.0 000 ---1,677,000.00 - 1,649,617.71 27,382.29 -SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 313385XN 1 P 20 MATURED PAR VALUE OF F H L B DISC NTS 6/01/26 3,700,000 PAR VALUE AT 100 % - 3,700,000.000 0 100.0 000 ---3,688,498.14 - 3,688,498.14 --SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 313589XN 8 P 20 MATURED PAR VALUE OF F N M A DISC NT 6/01/26 100,000 PAR VALUE AT 100 % -100,000.0000 100.0 000 ---99,940.67 -99,940.67 --SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 13,619,064.00 00 ----- 13,619,064.00 13,619,064.0 0 --SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 39,400,905.87 00 ----39,400,905.87 - 39,400,905.8 7 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 3 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 03-Jun- 26 03-Jun-26 3133ERGC 9 FFC4926 I 310 INTEREST EARNED ON F F C B DEB 3.72043% 6/03/26 $1 PV ON 700000.0000 SHARES DUE 6/3/2026 -----6,655.44 ---SEI 03-Jun- 26 15-May- 26 15-May-26 3130B9EK 2 P 10 PURCHASED PAR VALUE OF F H L B DEB 3.560% 6/08/26 /BARCLAYS CAPITAL INC. FIXED IN/1,000,000 PAR VALUE AT 99.99836 % 1,000,000.000 0 99.99 84 ----999,983.60 999,983.60 --SEI 03-Jun- 26 02-Jun- 26 03-Jun-26 912797UC 9 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 6/30/26 /BMO- CHICAGO BRANCH/2,900,000 PAR VALUE AT 99.7276 % 2,900,000.000 0 99.72 76 ----2,892,100.40 2,892,100.40 --SEI 03-Jun- 26 02-Jun- 26 03-Jun-26 912797TY 3 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 8/27/26 /J.P. MORGAN SECURITIES LLC/1,975,000 PAR VALUE AT 99.14681266 % 1,975,000.000 0 99.14 68 ----1,958,149.55 1,958,149.55 --SEI 03-Jun- 26 02-Jun- 26 03-Jun-26 912797UU 9 P 20 SOLD PAR VALUE OF U S TREASURY BILL 8/18/26 /BMO-CHICAGO BRANCH/2,000,000 PAR VALUE AT 99.238839 % - 2,000,000.000 0 99.23 88 ---1,976,793.56 - 1,976,793.56 --SEI 03-Jun- 26 03-Jun- 26 03-Jun-26 3133ERGC 9 FFC4926 P 20 MATURED PAR VALUE OF F F C B DEB 3.72043% 6/03/26 700,000 PAR VALUE AT 100 % -700,000.0000 100.0 000 ---700,000.00 -700,198.80 -198.80 -SEI 03-Jun- 26 03-Jun- 26 03-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 2,158,817.730 0 ----2,158,817.73 - 2,158,817.73 --SEI 03-Jun- 26 03-Jun- 26 03-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -26,168.5700 ----26,168.57 -26,168.57 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 5 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Post Date 03-Jun-26 Total ----980,685.03 988,254.89 -198.80 -SEI 04-Jun- 26 15-May-26 3130B9EK 2 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 3.560% 6/08/26 -----6,945.44 ---SEI 04-Jun- 26 04-Jun-26 17325FBC 1 I 310 INTEREST EARNED ON CITIBANK N A SR NT 5.488% 12/04/26 $1 PV ON 1000000.0000 SHARES DUE 6/4/2026 -----27,440.00 ---SEI 04-Jun- 26 15-May- 26 15-May-26 3130B9EK 2 P 10 PURCHASE-REV PAR VALUE OF F H L B DEB 3.560% 6/08/26 /BARCLAYS CAPITAL INC. FIXED IN/1,000,000 PAR VALUE AT 99.99836 % - 1,000,000.000 0 99.99 84 ---999,983.60 -999,983.60 --SEI 04-Jun- 26 04-Jun- 26 04-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 53,684.0100 -----53,684.01 53,684.01 --SEI Post Date 04-Jun-26 Total ---980,685.03 -946,299.59 --SEI 08-Jun- 26 08-Jun-26 3130B9EK 2 I 310 INTEREST EARNED ON F H L B DEB 3.560% 6/08/26 $1 PV ON 1000000.0000 SHARES DUE 6/8/2026 -----9,253.33 ---SEI 08-Jun- 26 08-Jun- 26 08-Jun-26 3130B9EK 2 P 20 MATURED PAR VALUE OF F H L B DEB 3.560% 6/08/26 1,000,000 PAR VALUE AT 100 % - 1,000,000.000 0 100.0 000 ---1,000,000.00 -999,983.60 16.40 -SEI 08-Jun- 26 08-Jun- 26 08-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 1,000,000.000 0 -----1,000,000.00 1,000,000.00 --SEI 08-Jun- 26 08-Jun- 26 08-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 1,039,785.920 0 ----1,039,785.92 - 1,039,785.92 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 6 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 08-Jun- 26 08-Jun- 26 08-Jun-26 14912EFH 5 P 10 PURCHASED PAR VALUE OF CATERPILLAR FINL SVCS C P 6/17/26 /BARCLAYS CAPITAL INC. FIXED IN/1,050,000 PAR VALUE AT 99.9085 % 1,050,000.000 0 99.90 85 ----1,049,039.25 1,049,039.25 --SEI Post Date 08-Jun-26 Total ----9,269.73 16.40 -SEI 09-Jun- 26 09-Jun-26 59166HF 94 I 310 INTEREST EARNED ON METLIFE SHORT TERM FDG C P 6/09/26 $1 PV ON 1400000.0000 SHARES DUE 6/9/2026 1,400,000 PAR VALUE AT 100 % -----14,168.00 ---SEI 09-Jun- 26 09-Jun-26 64952WED 1 I 310 INTEREST EARNED ON NEW YORK LIFE MTN 1.150% 6/09/26 $1 PV ON 173000.0000 SHARES DUE 6/9/2026 INT ON MATU 6/9 -----994.75 ---SEI 09-Jun- 26 09-Jun-26 912797UA 3 I 310 INTEREST EARNED ON U S TREASURY BILL 6/16/26 $1 PV ON 6500000.0000 SHARES DUE 6/9/2026 6,500,000 PAR VALUE AT 99.93031108 % -----24,409.29 ---SEI 09-Jun- 26 08-Jun- 26 09-Jun-26 912797VK 0 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 10/06/26 /BMO- CHICAGO BRANCH/1,550,000 PAR VALUE AT 98.79446387 % 1,550,000.000 0 98.79 45 ----1,531,314.19 1,531,314.19 --SEI 09-Jun- 26 09-Jun- 26 09-Jun-26 64952WED 1 P 20 MATURED PAR VALUE OF NEW YORK LIFE MTN 1.150% 6/09/26 173,000 PAR VALUE AT 100 % -173,000.0000 100.0 000 ---173,000.00 -171,738.83 1,261.17 -SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 7 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 09-Jun- 26 09-Jun- 26 09-Jun-26 59166HF 94 P 20 MATURED PAR VALUE OF METLIFE SHORT TERM FDG C P 6/09/26 1,400,000 PAR VALUE AT 100 % - 1,400,000.000 0 100.0 000 ---1,385,832.00 - 1,385,832.00 --SEI 09-Jun- 26 09-Jun- 26 09-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 41,685.8100 -----41,685.81 41,685.81 --SEI 09-Jun- 26 09-Jun- 26 09-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -39,550.7800 ----39,550.78 -39,550.78 --SEI 09-Jun- 26 09-Jun- 26 09-Jun-26 16677KFW 8 P 10 PURCHASED PAR VALUE OF CHEVRON CORP DISC COML C P 6/30/26 /BOFA SECURITIES, INC./FXD INC/6,550,000 PAR VALUE AT 99.7865 % 6,550,000.000 0 99.78 65 ----6,536,015.75 6,536,015.75 --SEI 09-Jun- 26 09-Jun- 26 09-Jun-26 912797UA 3 P 20 SOLD PAR VALUE OF U S TREASURY BILL 6/16/26 /WELLS FARGO SECURITIES, LLC/6,500,000 PAR VALUE AT 99.93031108 % - 6,500,000.000 0 99.93 03 ---6,471,060.93 - 6,471,060.93 --SEI Post Date 09-Jun-26 Total ----40,833.21 1,261.17 -SEI 10-Jun- 26 10-Jun-26 14689FAA 3 I 310 INTEREST EARNED ON CARVANA AUTO RECEIV 3.930% 3/10/27 $1 PV ON 1580.3300 SHARES DUE 6/10/2026 $0.00328/PV ON 482,543.12 PV DUE 6/10/26 -----1,580.33 ---SEI 10-Jun- 26 10-Jun- 26 10-Jun-26 14689FAA 3 P 20 PAID DOWN PAR VALUE OF CARVANA AUTO RECEIV 3.930% 3/10/27 -294,511.4500 ----294,511.45 -294,511.45 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 8 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 10-Jun- 26 10-Jun- 26 10-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 296,091.7800 -----296,091.78 296,091.78 --SEI Post Date 10-Jun-26 Total ----1,580.33 --SEI 15-Jun- 26 15-Jun-26 10807VAA 3 I 310 INTEREST EARNED ON BRIDGECRE LDG AT 4.383% 4/15/27 $1 PV ON 3212.9200 SHARES DUE 6/15/2026 $0.00342/PV ON 939,595.19 PV DUE 6/15/26 -----3,212.92 ---SEI 15-Jun- 26 15-Jun-26 3137BTUM 1 FHL3326 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C MLTCL MTG 3.347% 11/25/26 ------825.24 ---SEI 15-Jun- 26 15-Jun-26 3134GXHY 3 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C M T N 0.750% 6/23/26 ------2,830.83 ---SEI 15-Jun- 26 15-Jun-26 3133EMH 21 I 310 INTEREST EARNED ON F F C B DEB 0.900% 6/15/26 $1 PV ON 1000000.0000 SHARES DUE 6/15/2026 -----4,500.00 ---SEI 15-Jun- 26 15-Jun-26 46625HRS 1 I 310 INTEREST EARNED ON JPMORGAN CHASE CO 3.200% 6/15/26 $1 PV ON 1439000.0000 SHARES DUE 6/15/2026 -----23,024.00 ---SEI 15-Jun- 26 15-Jun-26 3133ERHG 9 FFC4426V I 310 INTEREST EARNED ON F F C B DEB 3.740% 9/14/26 $1 PV ON 2010000.0000 SHARES DUE 6/14/2026 -----19,211.14 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 9 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-Jun- 26 15-Jun-26 3130B5JD 1 I 310 INTEREST EARNED ON F H L B DEB 3.690% 6/15/26 $1 PV ON 8500000.0000 SHARES DUE 6/15/2026 -----79,453.75 ---SEI 15-Jun- 26 15-Jun-26 3130B8TR 3 I 310 INTEREST EARNED ON F H L B DEB 3.600% 6/15/26 $1 PV ON 1000000.0000 SHARES DUE 6/15/2026 -----9,270.83 ---SEI 15-Jun- 26 10-Jun- 26 15-Jun-26 3137BTUM 1 FHL3326 P 10 PURCHASED PAR VALUE OF F H L M C MLTCL MTG 3.347% 11/25/26 /MORGAN STANLEY & CO. LLC/634,016.59 PAR VALUE AT 99.54687463 % 634,016.5900 99.54 69 ----631,143.70 631,143.70 --SEI 15-Jun- 26 12-Jun- 26 15-Jun-26 3134GXHY 3 P 10 PURCHASED PAR VALUE OF F H L M C M T N 0.750% 6/23/26 /CITIGROUP GLOBAL MARKETS INC./790,000 PAR VALUE AT 99.935 % 790,000.0000 99.93 50 ----789,486.50 789,486.50 --SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 10807VAA 3 P 20 PAID DOWN PAR VALUE OF BRIDGECRE LDG AT 4.383% 4/15/27 -306,381.3800 ----306,381.38 -306,381.38 --SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 3130B5JD 1 P 20 MATURED PAR VALUE OF F H L B DEB 3.690% 6/15/26 8,500,000 PAR VALUE AT 100 % - 8,500,000.000 0 100.0 000 ---8,500,000.00 - 8,500,217.94 -217.94 -SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 46625HRS 1 P 20 MATURED PAR VALUE OF JPMORGAN CHASE CO 3.200% 6/15/26 1,439,000 PAR VALUE AT 100 % - 1,439,000.000 0 100.0 000 ---1,439,000.00 - 1,425,012.92 13,987.08 -SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 10 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-Jun- 26 15-Jun- 26 15-Jun-26 3130B8TR 3 P 20 MATURED PAR VALUE OF F H L B DEB 3.600% 6/15/26 1,000,000 PAR VALUE AT 100 % - 1,000,000.000 0 100.0 000 ---1,000,000.00 -999,990.00 10.00 -SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 3133EMH 21 P 20 MATURED PAR VALUE OF F F C B DEB 0.900% 6/15/26 1,000,000 PAR VALUE AT 100 % - 1,000,000.000 0 100.0 000 ---1,000,000.00 -996,232.00 3,768.00 -SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 10,871,043.17 00 ----- 10,871,043.17 10,871,043.1 7 --SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 10,595,091.67 00 ----10,595,091.67 - 10,595,091.6 7 --SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 313385YT 7 P 10 PURCHASED PAR VALUE OF F H L B DISC NTS 6/30/26 /IRVTUS3N BK OF NEW YORK/5,000,000 PAR VALUE AT 99.84875 % 5,000,000.000 0 99.84 88 ----4,992,437.50 4,992,437.50 --SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 313313YT 9 P 10 PURCHASED PAR VALUE OF F F C B DISC NTS 6/30/26 /BARCLAYS CAPITAL INC. FIXED IN/5,700,000 PAR VALUE AT 99.84875 % 5,700,000.000 0 99.84 88 ----5,691,378.75 5,691,378.75 --SEI Post Date 15-Jun-26 Total ----152,563.71 17,547.14 -SEI 16-Jun- 26 16-Jun-26 3130AMTX 0 FHL0726 AU I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 2.000% 6/30/26 ------17,983.33 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 11 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 16-Jun- 26 16-Jun-26 912797UA 3 I 310 INTEREST EARNED ON U S TREASURY BILL 6/16/26 $1 PV ON 3450000.0000 SHARES DUE 6/16/2026 3,450,000 PAR VALUE AT 100 % -----9,639.88 ---SEI 16-Jun- 26 15-Jun- 26 16-Jun-26 3130AMTX 0 FHL0726 AU P 10 PURCHASED PAR VALUE OF F H L B DEB 2.000% 6/30/26 /PNCCUS31CMG PNC U.S./1,300,000 PAR VALUE AT 99.971 % 1,300,000.000 0 99.97 10 ----1,299,623.00 1,299,623.00 --SEI 16-Jun- 26 16-Jun- 26 16-Jun-26 912797UA 3 P 20 MATURED PAR VALUE OF U S TREASURY BILL 6/16/26 3,450,000 PAR VALUE AT 100 % - 3,450,000.000 0 100.0 000 ---3,440,360.12 - 3,440,360.12 --SEI 16-Jun- 26 16-Jun- 26 16-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 2,132,393.670 0 -----2,132,393.67 2,132,393.67 --SEI 16-Jun- 26 16-Jun- 26 16-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 2,696,242.570 0 ----2,696,242.57 - 2,696,242.57 --SEI 16-Jun- 26 16-Jun- 26 16-Jun-26 912797UC 9 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 6/30/26 /WELLS FARGO SECURITIES, LLC/2,700,000 PAR VALUE AT 99.86083593 % 2,700,000.000 0 99.86 08 ----2,696,242.57 2,696,242.57 --SEI Post Date 16-Jun-26 Total -----8,343.45 --SEI 17-Jun- 26 17-Jun-26 14912EFH 5 I 310 INTEREST EARNED ON CATERPILLAR FINL SVCS C P 6/17/26 $1 PV ON 1050000.0000 SHARES DUE 6/17/2026 1,050,000 PAR VALUE AT 100 % -----960.75 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 12 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 17-Jun- 26 09-Jun- 26 17-Jun-26 05330XAA 5 P 10 PURCHASED PAR VALUE OF AUTONATION FIN TR 0.00001% 6/15/27 /MIZUHO SECURITIES USA INC./1,000,000 PAR VALUE AT 100 % 1,000,000.000 0 100.0 000 ----1,000,000.00 1,000,000.00 --SEI 17-Jun- 26 17-Jun- 26 17-Jun-26 14912EFH 5 P 20 MATURED PAR VALUE OF CATERPILLAR FINL SVCS C P 6/17/26 1,050,000 PAR VALUE AT 100 % - 1,050,000.000 0 100.0 000 ---1,049,039.25 - 1,049,039.25 --SEI 17-Jun- 26 17-Jun- 26 17-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 50,000.0000 -----50,000.00 50,000.00 --SEI Post Date 17-Jun-26 Total ----960.75 --SEI 18-Jun- 26 18-Jun-26 912797TD 9 I 310 INTEREST EARNED ON U S TREASURY BILL 6/18/26 $1 PV ON 2400000.0000 SHARES DUE 6/18/2026 2,400,000 PAR VALUE AT 100 % -----39,365.73 ---SEI 18-Jun- 26 18-Jun-26 3130AMUB 6 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 0.600% 6/30/26 ------10,500.00 ---SEI 18-Jun- 26 18-Jun-26 3130AMSS 2 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 1.050% 6/30/26 ------2,450.00 ---SEI 18-Jun- 26 18-Jun-26 3135G07G 2 I 310 INTEREST EARNED ON F N M A 5.430% 6/18/26 $1 PV ON 1660000.0000 SHARES DUE 6/18/2026 -----15,785.22 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 13 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 18-Jun- 26 18-Jun-26 03066CAA 6 I 310 INTEREST EARNED ON AMERICREDIT AM 3.986% 3/18/27 $1 PV ON 2143.4300 SHARES DUE 6/18/2026 $0.00343/PV ON 624,471.56 PV DUE 6/18/26 -----2,143.43 ---SEI 18-Jun- 26 17-Jun- 26 18-Jun-26 3130AMSS 2 P 10 PURCHASED PAR VALUE OF F H L B DEB 1.050% 6/30/26 /MIZUHO SECURITIES USA INC./500,000 PAR VALUE AT 99.91 % 500,000.0000 99.91 00 ----499,550.00 499,550.00 --SEI 18-Jun- 26 17-Jun- 26 18-Jun-26 3130AMUB 6 P 10 PURCHASED PAR VALUE OF F H L B DEB 0.600% 6/30/26 /MIZUHO SECURITIES USA INC./750,000 PAR VALUE AT 99.972 % 750,000.0000 99.97 20 ----749,790.00 749,790.00 --SEI 18-Jun- 26 18-Jun- 26 18-Jun-26 912797TD 9 P 20 MATURED PAR VALUE OF U S TREASURY BILL 6/18/26 2,400,000 PAR VALUE AT 100 % - 2,400,000.000 0 100.0 000 ---2,360,634.27 - 2,360,634.27 --SEI 18-Jun- 26 18-Jun- 26 18-Jun-26 3135G07G 2 P 20 MATURED PAR VALUE OF F N M A 5.430% 6/18/26 1,660,000 PAR VALUE AT 100 % - 1,660,000.000 0 100.0 000 ---1,660,000.00 - 1,660,493.02 -493.02 -SEI 18-Jun- 26 18-Jun- 26 18-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 2,797,710.000 0 -----2,797,710.00 2,797,710.00 --SEI 18-Jun- 26 18-Jun- 26 18-Jun-26 03066CAA 6 P 20 PAID DOWN PAR VALUE OF AMERICREDIT AM 3.986% 3/18/27 -202,580.6000 ----202,580.60 -202,580.60 --SEI 18-Jun- 26 18-Jun- 26 18-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 220,509.2500 -----220,509.25 220,509.25 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 14 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Post Date 18-Jun-26 Total ----43,851.36 -493.02 -SEI 22-Jun- 26 22-Jun-26 92868CAA 9 I 310 INTEREST EARNED ON VOLKSWAGEN AUTO 3.828% 3/22/27 $1 PV ON 2371.2000 SHARES DUE 6/20/2026 $0.00351/PV ON 675,747.24 PV DUE 6/20/26 -----2,371.20 ---SEI 22-Jun- 26 20-Jun- 26 22-Jun-26 92868CAA 9 P 20 PAID DOWN PAR VALUE OF VOLKSWAGEN AUTO 3.828% 3/22/27 -178,508.2400 ----178,508.24 -178,508.24 --SEI 22-Jun- 26 22-Jun- 26 22-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 2,816,687.230 0 ----2,816,687.23 - 2,816,687.23 --SEI 22-Jun- 26 22-Jun- 26 22-Jun-26 14912EFW 2 P 10 PURCHASED PAR VALUE OF CATERPILLAR FINL SVCS C P 6/30/26 /BARCLAYS CAPITAL INC. FIXED IN/3,000,000 PAR VALUE AT 99.918889 % 3,000,000.000 0 99.91 89 ----2,997,566.67 2,997,566.67 --SEI Post Date 22-Jun-26 Total ----2,371.20 --SEI 23-Jun- 26 23-Jun-26 437076CZ 3 I 300 PAID ACCRUED INTEREST ON PURCHASE OF HOME DEPOT INC 5.150% 6/25/26 ------53,474.17 ---SEI 23-Jun- 26 23-Jun-26 3134GXHY 3 I 310 INTEREST EARNED ON F H L M C M T N 0.750% 6/23/26 $1 PV ON 790000.0000 SHARES DUE 6/23/2026 -----2,962.50 ---SEI 23-Jun- 26 23-Jun-26 3133ET5M 5 FFC3626G I 310 INTEREST EARNED ON F F C B 3.62565% 6/23/26 $1 PV ON 1000000.0000 SHARES DUE 6/23/2026 -----9,265.56 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 15 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 23-Jun- 26 23-Jun-26 3133EPNG 6 I 310 INTEREST EARNED ON F F C B DEB 4.375% 6/23/26 $1 PV ON 357000.0000 SHARES DUE 6/23/2026 -----7,809.38 ---SEI 23-Jun- 26 22-Jun- 26 23-Jun-26 437076CZ 3 P 10 PURCHASED PAR VALUE OF HOME DEPOT INC 5.150% 6/25/26 /GOLDMAN SACHS & CO. LLC/XOTC 2,100,000 PAR VALUE AT 100.007 % 2,100,000.000 0 100.0 070 ----2,100,147.00 2,100,147.00 --SEI 23-Jun- 26 23-Jun- 26 23-Jun-26 3134GXHY 3 P 20 MATURED PAR VALUE OF F H L M C M T N 0.750% 6/23/26 790,000 PAR VALUE AT 100 % -790,000.0000 100.0 000 ---790,000.00 -789,486.50 513.50 -SEI 23-Jun- 26 23-Jun- 26 23-Jun-26 3133ET5M 5 FFC3626G P 20 MATURED PAR VALUE OF F F C B 3.62565% 6/23/26 1,000,000 PAR VALUE AT 100 % - 1,000,000.000 0 100.0 000 ---1,000,000.00 -999,987.00 13.00 -SEI 23-Jun- 26 23-Jun- 26 23-Jun-26 3133EPNG 6 P 20 MATURED PAR VALUE OF F F C B DEB 4.375% 6/23/26 357,000 PAR VALUE AT 100 % -357,000.0000 100.0 000 ---357,000.00 -357,449.46 -449.46 -SEI 23-Jun- 26 23-Jun- 26 23-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 13,416.2700 -----13,416.27 13,416.27 --SEI Post Date 23-Jun-26 Total -----33,359.69 77.04 -SEI 25-Jun- 26 25-Jun-26 437076CZ 3 I 310 INTEREST EARNED ON HOME DEPOT INC 5.150% 6/25/26 $1 PV ON 2100000.0000 SHARES DUE 6/25/2026 -----54,075.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 16 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun-26 3130BA2U 0 I 310 INTEREST EARNED ON F H L B DEB 4.000% 3/25/27 $1 PV ON 1000000.0000 SHARES DUE 6/25/2026 -----10,000.00 ---SEI 25-Jun- 26 25-Jun-26 3137BTAC 5 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 3.300% 10/25/26 $1 PV ON 2748.8200 SHARES DUE 6/25/2026 $0.00275/PV ON 999,569.14 PV DUE 6/25/26 -----2,748.82 ---SEI 25-Jun- 26 25-Jun-26 3137BRQJ 7 FHL2526E I 310 INTEREST EARNED ON F H L M C MLTCL MTG 2.570% 7/25/26 $1 PV ON 1786.3300 SHARES DUE 6/25/2026 $0.00214/PV ON 834,087.10 PV DUE 6/25/26 -----1,786.33 ---SEI 25-Jun- 26 25-Jun-26 3137BXQY 1 FHL3227A I 310 INTEREST EARNED ON F H L M C MLTCL MT 3.224% 3/25/27 $1 PV ON 2686.6700 SHARES DUE 6/25/2026 $0.00269/PV ON 1,000,000.00 PV DUE 6/25/26 -----2,686.67 ---SEI 25-Jun- 26 25-Jun-26 3137BVZ 82 FHL3450 I 310 INTEREST EARNED ON F H L M C MLTCL MT 3.430% 1/25/27 $1 PV ON 2818.2900 SHARES DUE 6/25/2026 $0.00286/PV ON 985,989.92 PV DUE 6/25/26 -----2,818.29 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 17 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun-26 3137BSP 72 FHL2625B I 310 INTEREST EARNED ON F H L M C MLTCL MT 2.653% 8/25/26 $1 PV ON 2214.9900 SHARES DUE 6/25/2026 $0.00221/PV ON 1,001,879.52 PV DUE 6/25/26 -----2,214.99 ---SEI 25-Jun- 26 25-Jun-26 3137BUX 60 FHL3426 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 3.413% 12/25/26 $1 PV ON 2798.0500 SHARES DUE 6/25/2026 $0.00284/PV ON 983,784.59 PV DUE 6/25/26 -----2,798.05 ---SEI 25-Jun- 26 25-Jun-26 3137 FNWX4 FHL2226C I 310 INTEREST EARNED ON F H L M C MLTCL MT 2.282% 7/25/26 $1 PV ON 166.9300 SHARES DUE 6/25/2026 $0.00190/PV ON 87,783.45 PV DUE 6/25/26 -----166.93 ---SEI 25-Jun- 26 25-Jun-26 3137FQXJ 7 FHL2526C I 310 INTEREST EARNED ON F H L M C MLTCL MT 2.525% 10/25/26 $1 PV ON 2387.7700 SHARES DUE 6/25/2026 $0.00210/PV ON 1,134,780.49 PV DUE 6/25/26 -----2,387.77 ---SEI 25-Jun- 26 25-Jun-26 912797TQ 0 I 310 INTEREST EARNED ON U S TREASURY BILL 7/30/26 $1 PV ON 2350000.0000 SHARES DUE 6/25/2026 2,350,000 PAR VALUE AT 99.65189574 % -----13,845.12 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 18 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun-26 912797UQ 8 I 310 INTEREST EARNED ON U S TREASURY BILL 7/21/26 $1 PV ON 1000000.0000 SHARES DUE 6/25/2026 1,000,000 PAR VALUE AT 99.742853 % -----9,086.53 ---SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3130BA2U 0 P 20 FULL CALL PAR VALUE OF F H L B DEB 4.000% 3/25/27 /CALLS/ - 1,000,000.000 0 100.0 000 ---1,000,000.00 - 1,000,000.00 --SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 437076CZ 3 P 20 MATURED PAR VALUE OF HOME DEPOT INC 5.150% 6/25/26 2,100,000 PAR VALUE AT 100 % - 2,100,000.000 0 100.0 000 ---2,100,000.00 - 2,100,147.00 -147.00 -SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,154,075.000 0 -----3,154,075.00 3,154,075.00 --SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3137BTAC 5 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 3.300% 10/25/26 -1,997.9300 ----1,997.93 -1,988.17 9.76 -SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3137BRQJ 7 FHL2526E P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 2.570% 7/25/26 -552,641.0200 ----552,641.02 -549,642.76 2,998.26 -SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3137BVZ 82 FHL3450 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 3.430% 1/25/27 -2,265.6300 ----2,265.63 -2,253.59 12.04 -SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3137BSP 72 FHL2625B P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 2.653% 8/25/26 -104,165.8500 ----104,165.85 -103,632.81 533.04 -SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 19 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun- 26 25-Jun-26 3137BUX 60 FHL3426 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 3.413% 12/25/26 -2,141.6700 ----2,141.67 -2,132.38 9.29 -SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3137 FNWX4 FHL2226C P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 2.282% 7/25/26 -87,624.7800 ----87,624.78 -87,248.26 376.52 -SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3137FQXJ 7 FHL2526C P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 2.525% 10/25/26 -189,103.0300 ----189,103.03 -187,290.69 1,812.34 -SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 2,189,890.970 0 ----2,189,890.97 - 2,189,890.97 --SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 14912EFW 2 P 10 PURCHASED PAR VALUE OF CATERPILLAR FINL SVCS C P 6/30/26 /BOFA SECURITIES, INC./FXD INC/6,500,000 PAR VALUE AT 99.94902785 % 6,500,000.000 0 99.94 90 ----6,496,686.81 6,496,686.81 --SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 912797TQ 0 P 20 SOLD PAR VALUE OF U S TREASURY BILL 7/30/26 /BARCLAYS CAPITAL INC. FIXED IN/2,350,000 PAR VALUE AT 99.65189574 % - 2,350,000.000 0 99.65 19 ---2,327,974.43 - 2,327,974.43 --SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 912797UQ 8 P 20 SOLD PAR VALUE OF U S TREASURY BILL 7/21/26 /IRVTUS3N BK OF NEW YORK/1,000,000 PAR VALUE AT 99.742853 % - 1,000,000.000 0 99.74 29 ---988,342.00 -988,342.00 --SEI Post Date 25-Jun-26 Total ----110,218.75 5,604.25 -SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 20 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 29-Jun- 26 29-Jun-26 91282CLP 4 I 300 PAID ACCRUED INTEREST ON PURCHASE OF U S TREASURY NT 3.500% 9/30/26 ------12,909.84 ---SEI 29-Jun- 26 29-Jun-26 912797VD 6 I 310 INTEREST EARNED ON U S TREASURY BILL 9/22/26 $1 PV ON 1300000.0000 SHARES DUE 6/26/2026 1,300,000 PAR VALUE AT 99.14338923 % -----4,428.60 ---SEI 29-Jun- 26 26-Jun- 26 29-Jun-26 91282CLP 4 P 10 PURCHASED PAR VALUE OF U S TREASURY NT 3.500% 9/30/26 /IRVTUS3N BK OF NEW YORK/1,500,000 PAR VALUE AT 99.918304 % 1,500,000.000 0 99.91 83 ----1,498,774.56 1,498,774.56 --SEI 29-Jun- 26 26-Jun- 26 29-Jun-26 912797VD 6 P 20 SOLD PAR VALUE OF U S TREASURY BILL 9/22/26 /BMO-CHICAGO BRANCH/1,300,000 PAR VALUE AT 99.14338923 % - 1,300,000.000 0 99.14 34 ---1,284,435.46 - 1,284,435.46 --SEI 29-Jun- 26 29-Jun- 26 29-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -222,820.3400 ----222,820.34 -222,820.34 --SEI Post Date 29-Jun-26 Total -----8,481.24 --SEI 30-Jun- 26 30-Jun-26 912797UR 6 I 310 INTEREST EARNED ON U S TREASURY BILL 7/28/26 $1 PV ON 2000000.0000 SHARES DUE 6/26/2026 2,000,000 PAR VALUE AT 99.7194555 % -----18,268.44 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 21 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Jun- 26 30-Jun-26 912797VD 6 I 310 INTEREST EARNED ON U S TREASURY BILL 9/22/26 $1 PV ON 700000.0000 SHARES DUE 6/26/2026 700,000 PAR VALUE AT 99.15265 % -----2,449.45 ---SEI 30-Jun- 26 30-Jun-26 313313YT 9 I 310 INTEREST EARNED ON F F C B DISC NTS 6/30/26 $1 PV ON 5700000.0000 SHARES DUE 6/30/2026 5,700,000 PAR VALUE AT 100 % -----8,621.25 ---SEI 30-Jun- 26 30-Jun-26 912797UC 9 I 310 INTEREST EARNED ON U S TREASURY BILL 6/30/26 $1 PV ON 23500000.0000 SHARES DUE 6/30/2026 23,500,000 PAR VALUE AT 100 % -----137,106.05 ---SEI 30-Jun- 26 30-Jun-26 14912EFW 2 I 310 INTEREST EARNED ON CATERPILLAR FINL SVCS C P 6/30/26 $1 PV ON 3000000.0000 SHARES DUE 6/30/2026 3,000,000 PAR VALUE AT 100 % -----2,433.33 ---SEI 30-Jun- 26 30-Jun-26 16677KFW 8 I 310 INTEREST EARNED ON CHEVRON CORP DISC COML C P 6/30/26 $1 PV ON 6550000.0000 SHARES DUE 6/30/2026 6,550,000 PAR VALUE AT 100 % -----13,984.25 ---SEI 30-Jun- 26 30-Jun-26 14912EFW 2 I 310 INTEREST EARNED ON CATERPILLAR FINL SVCS C P 6/30/26 $1 PV ON 6500000.0000 SHARES DUE 6/30/2026 6,500,000 PAR VALUE AT 100 % -----3,313.19 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 22 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Jun- 26 30-Jun-26 313385YT 7 I 310 INTEREST EARNED ON F H L B DISC NTS 6/30/26 $1 PV ON 5000000.0000 SHARES DUE 6/30/2026 5,000,000 PAR VALUE AT 100 % -----7,562.50 ---SEI 30-Jun- 26 30-Jun-26 3130AMSS 2 I 310 INTEREST EARNED ON F H L B DEB 1.050% 6/30/26 $1 PV ON 830000.0000 SHARES DUE 6/30/2026 -----4,357.50 ---SEI 30-Jun- 26 30-Jun-26 3130AMSL 7 I 310 INTEREST EARNED ON F H L B DEB 1.030% 6/30/26 $1 PV ON 425000.0000 SHARES DUE 6/30/2026 -----2,188.75 ---SEI 30-Jun- 26 30-Jun-26 3130AMYA 4 I 310 INTEREST EARNED ON F H L B DEB 1.070% 6/30/26 $1 PV ON 2400000.0000 SHARES DUE 6/30/2026 -----12,840.00 ---SEI 30-Jun- 26 30-Jun-26 3130AMYJ 5 I 310 INTEREST EARNED ON F H L B DEB 1.000% 6/30/26 $1 PV ON 1300000.0000 SHARES DUE 6/30/2026 -----6,500.00 ---SEI 30-Jun- 26 30-Jun-26 3130AMTX 0 FHL0726 AU I 310 INTEREST EARNED ON F H L B DEB 2.000% 6/30/26 $1 PV ON 1300000.0000 SHARES DUE 6/30/2026 -----19,500.00 ---SEI 30-Jun- 26 30-Jun-26 P 210 CASH DISBURSEMENT PAID TO ORANGE COUNTY SANITATION DISTRICT OUTGOING DOMESTIC WIRE TRANSFER FROM LIQUID OPERATING PORTFOLIO ------ 60,000,000.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 23 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Jun- 26 30-Jun-26 3130AMUB 6 I 310 INTEREST EARNED ON F H L B DEB 0.600% 6/30/26 $1 PV ON 750000.0000 SHARES DUE 6/30/2026 -----11,250.00 ---SEI 30-Jun- 26 26-Jun- 26 30-Jun-26 912797UR 6 P 20 SOLD PAR VALUE OF U S TREASURY BILL 7/28/26 /J.P. MORGAN SECURITIES LLC/2,000,000 PAR VALUE AT 99.7194555 % - 2,000,000.000 0 99.71 95 ---1,976,120.67 - 1,976,120.67 --SEI 30-Jun- 26 26-Jun- 26 30-Jun-26 912797VD 6 P 20 SOLD PAR VALUE OF U S TREASURY BILL 9/22/26 /J.P. MORGAN SECURITIES LLC/700,000 PAR VALUE AT 99.15265 % -700,000.0000 99.15 27 ---691,619.10 -691,619.10 --SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 313385YT 7 P 20 MATURED PAR VALUE OF F H L B DISC NTS 6/30/26 5,000,000 PAR VALUE AT 100 % - 5,000,000.000 0 100.0 000 ---4,992,437.50 - 4,992,437.50 --SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 3130AMYJ 5 P 20 MATURED PAR VALUE OF F H L B DEB 1.000% 6/30/26 1,300,000 PAR VALUE AT 100 % - 1,300,000.000 0 100.0 000 ---1,300,000.00 - 1,294,111.00 5,889.00 -SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 14912EFW 2 P 20 MATURED PAR VALUE OF CATERPILLAR FINL SVCS C P 6/30/26 6,500,000 PAR VALUE AT 100 % - 6,500,000.000 0 100.0 000 ---6,496,686.81 - 6,496,686.81 --SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 14912EFW 2 P 20 MATURED PAR VALUE OF CATERPILLAR FINL SVCS C P 6/30/26 3,000,000 PAR VALUE AT 100 % - 3,000,000.000 0 100.0 000 ---2,997,566.67 - 2,997,566.67 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 24 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Jun- 26 30-Jun- 26 30-Jun-26 3130AMSS 2 P 20 MATURED PAR VALUE OF F H L B DEB 1.050% 6/30/26 500,000 PAR VALUE AT 100 % -500,000.0000 100.0 000 ---500,000.00 -499,550.00 450.00 -SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 3130AMYA 4 P 20 MATURED PAR VALUE OF F H L B DEB 1.070% 6/30/26 2,400,000 PAR VALUE AT 100 % - 2,400,000.000 0 100.0 000 ---2,400,000.00 - 2,391,978.48 8,021.52 -SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 3130AMTX 0 FHL0726 AU P 20 MATURED PAR VALUE OF F H L B DEB 2.000% 6/30/26 1,300,000 PAR VALUE AT 100 % - 1,300,000.000 0 100.0 000 ---1,300,000.00 - 1,299,623.00 377.00 -SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 3130AMSL 7 P 20 MATURED PAR VALUE OF F H L B DEB 1.030% 6/30/26 425,000 PAR VALUE AT 100 % -425,000.0000 100.0 000 ---425,000.00 -422,921.75 2,078.25 -SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 313313YT 9 P 20 MATURED PAR VALUE OF F F C B DISC NTS 6/30/26 5,700,000 PAR VALUE AT 100 % - 5,700,000.000 0 100.0 000 ---5,691,378.75 - 5,691,378.75 --SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 3130AMSS 2 P 20 MATURED PAR VALUE OF F H L B DEB 1.050% 6/30/26 330,000 PAR VALUE AT 100 % -330,000.0000 100.0 000 ---330,000.00 -328,361.22 1,638.78 -SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 3130AMUB 6 P 20 MATURED PAR VALUE OF F H L B DEB 0.600% 6/30/26 750,000 PAR VALUE AT 100 % -750,000.0000 100.0 000 ---750,000.00 -749,790.00 210.00 -SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 25 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Jun- 26 30-Jun- 26 30-Jun-26 16677KFW 8 P 20 MATURED PAR VALUE OF CHEVRON CORP DISC COML C P 6/30/26 6,550,000 PAR VALUE AT 100 % - 6,550,000.000 0 100.0 000 ---6,536,015.75 - 6,536,015.75 --SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 912797UC 9 P 20 MATURED PAR VALUE OF U S TREASURY BILL 6/30/26 23,500,000 PAR VALUE AT 100 % - 23,500,000.00 00 100.0 000 ---23,362,893.95 - 23,362,893.9 5 --SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 59,984,593.91 00 ----- 59,984,593.91 59,984,593.9 1 --SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 59,984,500.00 00 ----59,984,500.00 - 59,984,500.0 0 --SEI Post Date 30-Jun-26 Total ----- 59,730,960.7 4 18,664.55 -SEI Account 6745046600 Total ----- 99,212,214.9 2 49,744.70 -SEI Account Ending Cash Principal Cash: - 27,607,612.34 Income Cash: 27,607,612.34 Total Cash: - TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 26 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Account Beginning Cash Principal Cash: - 120,811,052.80 Income Cash: 120,811,052.80 Total Cash: - 01-Jun- 26 01-Jun-26 91282CKF 7 I 300 PAID ACCRUED INTEREST ON PURCHASE OF U S TREASURY NT 4.125% 3/31/31 ------58,871.42 ---SEI 01-Jun- 26 01-Jun-26 91282CFJ 5 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 3.125% 8/31/29 -----33,564.03 ---SEI 01-Jun- 26 01-Jun-26 91282CJM 4 I 310 INTEREST EARNED ON UNITED STATES TREAS 4.375% 11/30/30 $1 PV ON 6285000.0000 SHARES DUE 5/31/2026 -----137,484.38 ---SEI 01-Jun- 26 01-Jun-26 3133EMHZ 8 I 310 INTEREST EARNED ON F F C B DEB 1.125% 6/01/29 $1 PV ON 2500000.0000 SHARES DUE 6/1/2026 -----14,062.50 ---SEI 01-Jun- 26 01-Jun-26 31846V567 FGZXX I 310 INTEREST EARNED ON FIRST AM GOVT OB FD CL Z UNIT ON 0.0000 SHARES DUE 5/31/2026 INTEREST FROM 5/1/26 TO 5/31/26 -----5,214.30 ---SEI 01-Jun- 26 29-May- 26 01-Jun-26 91282CKF 7 P 10 PURCHASED PAR VALUE OF U S TREASURY NT 4.125% 3/31/31 /GOLDMAN SACHS & CO. LLC/8,425,000 PAR VALUE AT 99.92578125 % 8,425,000.000 0 99.92 58 ----8,418,747.07 8,418,747.07 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 27 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 01-Jun- 26 29-May- 26 01-Jun-26 91282CFJ 5 P 20 SOLD PAR VALUE OF U S TREASURY NT 3.125% 8/31/29 /MORGAN STANLEY & CO. LLC/4,250,000 PAR VALUE AT 97.14810259 % - 4,250,000.000 0 97.14 81 ---4,128,794.36 - 4,097,597.66 -31,196.7 0 SEI 01-Jun- 26 01-Jun- 26 01-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 4,163,713.220 0 ----4,163,713.22 - 4,163,713.22 --SEI Post Date 01-Jun-26 Total ---5,214.30 157,436.19 -31,196.7 0 SEI 02-Jun- 26 02-Jun- 26 02-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 5,214.3000 -----5,214.30 5,214.30 --SEI Post Date 02-Jun-26 Total ----5,214.30 5,214.30 --SEI 09-Jun- 26 09-Jun-26 912828Z94 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 1.500% 2/15/30 -----33,066.30 ---SEI 09-Jun- 26 02-Jun- 26 09-Jun-26 637639AT 2 P 10 PURCHASED PAR VALUE OF NATIONAL SECS 4.700% 6/09/31 /CANTOR FITZGERALD & CO./2,889,000 PAR VALUE AT 100.093 % 2,889,000.000 0 100.0 930 ----2,891,686.77 2,891,686.77 --SEI 09-Jun- 26 02-Jun- 26 09-Jun-26 637639AT 2 P 10 PURCHASED PAR VALUE OF NATIONAL SECS 4.700% 6/09/31 /BOFA SECURITIES, INC./FXD INC/3,611,000 PAR VALUE AT 99.969 % 3,611,000.000 0 99.96 90 ----3,609,880.59 3,609,880.59 --SEI 09-Jun- 26 08-Jun- 26 09-Jun-26 912828Z94 P 20 SOLD PAR VALUE OF U S TREASURY NT 1.500% 2/15/30 /IRVTUS3N BK OF NEW YORK/7,000,000 PAR VALUE AT 90.82779 % - 7,000,000.000 0 90.82 78 ---6,357,945.30 - 6,281,452.01 -76,493.2 9 SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 28 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 09-Jun- 26 09-Jun- 26 09-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -110,555.7600 ----110,555.76 -110,555.76 --SEI Post Date 09-Jun-26 Total ----109,559.59 -76,493.2 9 SEI 11-Jun- 26 11-Jun-26 06051GJB 6 I 300 PAID ACCRUED INTEREST ON PURCHASE OF BANK AMER CORP MTN 2.592% 4/29/31 ------5,292.00 ---SEI 11-Jun- 26 11-Jun-26 91282CKC 4 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 4.250% 2/28/31 -----83,267.66 ---SEI 11-Jun- 26 11-Jun-26 91282CMD 0 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 4.375% 12/31/29 -----137,051.10 ---SEI 11-Jun- 26 11-Jun-26 06051GGF 0 I 301 RECEIVED ACCRUED INTEREST ON SALE OF BANK OF AMERICA MTN 3.824% 1/20/28 -----93,982.77 ---SEI 11-Jun- 26 10-Jun- 26 11-Jun-26 06051GJB 6 P 10 PURCHASED PAR VALUE OF BANK AMER CORP MTN 2.592% 4/29/31 /BNP PARIBAS SECURITIES BOND/1,750,000 PAR VALUE AT 92.098 % 1,750,000.000 0 92.09 80 ----1,611,715.00 1,611,715.00 --SEI 11-Jun- 26 10-Jun- 26 11-Jun-26 91282CKC 4 P 20 SOLD PAR VALUE OF U S TREASURY NT 4.250% 2/28/31 /J.P. MORGAN SECURITIES LLC/7,000,000 PAR VALUE AT 99.89029 % - 7,000,000.000 0 99.89 03 ---6,992,320.30 - 7,108,554.69 - 116,234.3 9 -SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 29 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 11-Jun- 26 10-Jun- 26 11-Jun-26 91282CMD 0 P 20 SOLD PAR VALUE OF U S TREASURY NT 4.375% 12/31/29 /J.P. MORGAN SECURITIES LLC/7,000,000 PAR VALUE AT 100.48013371 % - 7,000,000.000 0 100.4 801 ---7,033,609.36 - 7,155,312.50 - 121,703.1 4 -SEI 11-Jun- 26 10-Jun- 26 11-Jun-26 06051GGF 0 P 20 SOLD PAR VALUE OF BANK OF AMERICA MTN 3.824% 1/20/28 /BOFA SECURITIES, INC./FXD INC/6,275,000 PAR VALUE AT 99.635 % - 6,275,000.000 0 99.63 50 ---6,252,096.25 - 5,907,613.65 -344,482. 60 SEI 11-Jun- 26 11-Jun- 26 11-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 18,975,320.44 00 ----- 18,975,320.44 18,975,320.4 4 --SEI Post Date 11-Jun-26 Total ----415,554.60 - 237,937.5 3 344,482. 60 SEI 12-Jun- 26 12-Jun-26 3134HCY 37 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C DEB 4.500% 5/22/31 ------12,500.00 ---SEI 12-Jun- 26 12-Jun-26 693475BR 5 I 310 INTEREST EARNED ON PNC FINL SVCS GROUP 5.582% 6/12/29 $1 PV ON 8000000.0000 SHARES DUE 6/12/2026 -----223,280.00 ---SEI 12-Jun- 26 10-Jun- 26 12-Jun-26 3134HCY 37 P 10 PURCHASED PAR VALUE OF F H L M C DEB 4.500% 5/22/31 /BOFA SECURITIES, INC./FXD INC/5,000,000 PAR VALUE AT 100 % 5,000,000.000 0 100.0 000 ----5,000,000.00 5,000,000.00 --SEI 12-Jun- 26 12-Jun- 26 12-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 4,789,220.000 0 ----4,789,220.00 - 4,789,220.00 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 30 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Post Date 12-Jun-26 Total ----210,780.00 --SEI 15-Jun- 26 15-Jun-26 44935CAD 3 I 310 INTEREST EARNED ON HYUNDAI AUTO RECV TR 4.790% 10/15/29 $1 PV ON 15231.6000 SHARES DUE 6/15/2026 $0.00360/PV ON 4,231,000.00 PV DUE 6/15/26 -----15,231.60 ---SEI 15-Jun- 26 15-Jun-26 47787DAD 3 I 310 INTEREST EARNED ON JOHN DEERE OWNER 3.870% 8/15/30 $1 PV ON 3563.6300 SHARES DUE 6/15/2026 $0.00323/PV ON 1,105,000.00 PV DUE 6/15/26 -----3,563.63 ---SEI 15-Jun- 26 15-Jun-26 43816DAC 9 I 310 INTEREST EARNED ON HONDA AUTO 4.330% 3/15/29 $1 PV ON 6499.9500 SHARES DUE 6/15/2026 $0.00361/PV ON 1,801,371.47 PV DUE 6/15/26 -----6,499.95 ---SEI 15-Jun- 26 15-Jun-26 02582JKM 1 AE44529 I 310 INTEREST EARNED ON AMERICAN EXP 4.560% 12/17/29 $1 PV ON 40416.8000 SHARES DUE 6/15/2026 $0.00380/PV ON 10,636,000.00 PV DUE 6/15/26 -----40,416.80 ---SEI 15-Jun- 26 15-Jun-26 14043KAK 1 I 310 INTEREST EARNED ON CAPITAL ONE PRIME 4.760% 8/15/28 $1 PV ON 20785.3400 SHARES DUE 6/15/2026 $0.00397/PV ON 5,240,000.00 PV DUE 6/15/26 -----20,785.34 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 31 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-Jun- 26 15-Jun-26 361886DK 7 I 310 INTEREST EARNED ON GMF FLOORPL OWNE 4.680% 11/15/28 $1 PV ON 30069.0000 SHARES DUE 6/15/2026 $0.00390/PV ON 7,710,000.00 PV DUE 6/15/26 -----30,069.00 ---SEI 15-Jun- 26 15-Jun-26 448984AD 6 I 310 INTEREST EARNED ON HYUNDAI AUTO LEASE 4.620% 4/17/28 $1 PV ON 19250.0000 SHARES DUE 6/15/2026 $0.00385/PV ON 5,000,000.00 PV DUE 6/15/26 -----19,250.00 ---SEI 15-Jun- 26 15-Jun-26 58773DAD 6 I 310 INTEREST EARNED ON MERCEDES BENZ 4.780% 12/17/29 $1 PV ON 18960.6700 SHARES DUE 6/15/2026 $0.00398/PV ON 4,760,000.00 PV DUE 6/15/26 -----18,960.67 ---SEI 15-Jun- 26 15-Jun-26 50118HAC 0 KCO2530 I 310 INTEREST EARNED ON KUBOTA CR OWNER TR 3.870% 5/15/30 $1 PV ON 4992.3000 SHARES DUE 6/15/2026 $0.00323/PV ON 1,548,000.00 PV DUE 6/15/26 -----4,992.30 ---SEI 15-Jun- 26 15-Jun-26 05522RDL 9 I 310 INTEREST EARNED ON BANK OF AMERICA 4.220% 4/15/31 $1 PV ON 17780.6200 SHARES DUE 6/15/2026 $0.00363/PV ON 4,893,000.00 PV DUE 6/15/26 -----17,780.62 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 32 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-Jun- 26 15-Jun-26 47800BAC 2 JDO5027 I 310 INTEREST EARNED ON JOHN DEERE OWNER 5.090% 6/15/27 $1 PV ON 480.8300 SHARES DUE 6/15/2026 $0.00424/PV ON 113,359.49 PV DUE 6/15/26 -----480.83 ---SEI 15-Jun- 26 15-Jun-26 345282AD 9 I 310 INTEREST EARNED ON FORD CREDIT AT 4.940% 6/15/28 $1 PV ON 18887.8700 SHARES DUE 6/15/2026 $0.00393/PV ON 4,802,000.00 PV DUE 6/15/26 -----18,887.87 ---SEI 15-Jun- 26 15-Jun-26 161571HV 9 I 310 INTEREST EARNED ON CHASE ISSUE TR 4.600% 1/16/29 $1 PV ON 30820.0000 SHARES DUE 6/15/2026 $0.00383/PV ON 8,040,000.00 PV DUE 6/15/26 -----30,820.00 ---SEI 15-Jun- 26 15-Jun-26 3133TCE 95 FHL3032 I 310 INTEREST EARNED ON F H L M C MLTCL MT 4.532% 8/15/32 $1 PV ON 3.8000 SHARES DUE 6/15/2026 $0.00378/PV ON 977.30 PV DUE 6/15/26 -----3.80 ---SEI 15-Jun- 26 15-Jun-26 47800DAD 6 I 310 INTEREST EARNED ON JOHN DEERE OWNER TR 4.830% 9/17/29 $1 PV ON 10737.1500 SHARES DUE 6/15/2026 $0.00353/PV ON 3,046,000.00 PV DUE 6/15/26 -----10,737.15 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 33 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-Jun- 26 15-Jun-26 706916AC 7 I 310 INTEREST EARNED ON PENFED AUTO REC 4.650% 7/15/30 $1 PV ON 7401.7700 SHARES DUE 6/15/2026 $0.00336/PV ON 2,204,000.00 PV DUE 6/15/26 -----7,401.77 ---SEI 15-Jun- 26 15-Jun-26 92887TAC 5 I 310 INTEREST EARNED ON VOLVO FINANCIAL 4.460% 5/15/29 $1 PV ON 7619.1600 SHARES DUE 6/15/2026 $0.00372/PV ON 2,050,000.00 PV DUE 6/15/26 -----7,619.16 ---SEI 15-Jun- 26 15-Jun-26 31348SWZ 3 786064F I 310 INTEREST EARNED ON F H L M C #786064 5.762% 1/01/28 $1 PV ON 0.7300 SHARES DUE 6/15/2026 APRIL FHLMC DUE 6/15/26 -----0.73 ---SEI 15-Jun- 26 15-Jun-26 3137HQ4U 2 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C MLTCL 4.050% 1/25/31 ------11,817.23 ---SEI 15-Jun- 26 15-Jun-26 3137HA4L 7 FHL4631A I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C MLTCL MT 4.660% 1/25/31 ------13,555.42 ---SEI 15-Jun- 26 15-Jun-26 756109BS 2 I 310 INTEREST EARNED ON REALTY INCOME CORP 4.700% 12/15/28 $1 PV ON 5500000.0000 SHARES DUE 6/15/2026 -----129,250.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 34 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-Jun- 26 15-Jun-26 12674BAB 1 CE44328 I 310 INTEREST EARNED ON CNH EQUIPMENT 4.300% 8/15/28 $1 PV ON 5177.2200 SHARES DUE 6/15/2026 $0.00358/PV ON 1,444,804.35 PV DUE 6/15/26 -----5,177.22 ---SEI 15-Jun- 26 15-Jun-26 3137HPM 75 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 4.250% 1/15/31 $1 PV ON 21845.2000 SHARES DUE 6/15/2026 $0.00354/PV ON 6,168,055.63 PV DUE 6/15/26 -----21,845.20 ---SEI 15-Jun- 26 15-Jun-26 06406RBG 1 I 310 INTEREST EARNED ON BANK NEW YORK MTN 3.992% 6/13/28 $1 PV ON 2500000.0000 SHARES DUE 6/13/2026 -----49,900.00 ---SEI 15-Jun- 26 15-Jun-26 91282CMD 0 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 4.375% 12/31/29 -----10,031.08 ---SEI 15-Jun- 26 10-Jun- 26 15-Jun-26 3137HQ4U 2 P 10 PURCHASED PAR VALUE OF F H L M C MLTCL 4.050% 1/25/31 /SANTANDER US CAPITAL MKTS LLC/7,503,000 PAR VALUE AT 98.015625 % 7,503,000.000 0 98.01 56 ----7,354,112.34 7,354,112.34 --SEI 15-Jun- 26 10-Jun- 26 15-Jun-26 3137HA4L 7 FHL4631A P 10 PURCHASED PAR VALUE OF F H L M C MLTCL MT 4.660% 1/25/31 /BARCLAYS CAPITAL INC. FIXED IN/7,480,000 PAR VALUE AT 100.26171872 % 7,480,000.000 0 100.2 617 ----7,499,576.56 7,499,576.56 --SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 35 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-Jun- 26 15-Jun- 26 15-Jun-26 3133TCE 95 FHL3032 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 4.532% 8/15/32 -58.3000 ----58.30 -58.36 --0.06 SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 43816DAC 9 P 20 PAID DOWN PAR VALUE OF HONDA AUTO 4.330% 3/15/29 -123,330.0200 ----123,330.02 -123,312.57 -17.45 SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 31348SWZ 3 786064F P 20 PAID DOWN PAR VALUE OF F H L M C #786064 5.762% 1/01/28 MAY FHLMC DUE 6/15/26 -7.3800 ----7.38 -7.20 -0.18 SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 14,295,440.17 00 ----14,295,440.17 - 14,295,440.1 7 --SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 3137HPM 75 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 4.250% 1/15/31 -100,591.2700 ----100,591.27 -100,842.75 -251.48 -SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 12674BAB 1 CE44328 P 20 PAID DOWN PAR VALUE OF CNH EQUIPMENT 4.300% 8/15/28 -80,296.6300 ----80,296.63 -80,294.81 -1.82 SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 47800BAC 2 JDO5027 P 20 PAID DOWN PAR VALUE OF JOHN DEERE OWNER 5.090% 6/15/27 CMO FINAL PAYDOWN -113,359.4900 ----113,359.49 -113,350.69 -8.80 SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 807,943.5100 -----807,943.51 807,943.51 --SEI 15-Jun- 26 15-Jun- 26 15-Jun-26 91282CMD 0 P 20 SOLD PAR VALUE OF U S TREASURY NT 4.375% 12/31/29 /J.P. MORGAN SECURITIES LLC/500,000 PAR VALUE AT 100.843416 % -500,000.0000 100.8 434 ---504,217.08 -511,093.75 -6,876.67 -SEI Post Date 15-Jun-26 Total ----437,232.11 -7,128.15 28.19 SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 36 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 18-Jun- 26 18-Jun-26 3134HAW 33 I 310 INTEREST EARNED ON F H L M C M T N 4.750% 12/18/29 $1 PV ON 10000000.0000 SHARES DUE 6/18/2026 -----237,500.00 ---SEI 18-Jun- 26 18-Jun- 26 18-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 237,500.0000 -----237,500.00 237,500.00 --SEI Post Date 18-Jun-26 Total ----237,500.00 --SEI 22-Jun- 26 22-Jun-26 92348KDY 6 I 310 INTEREST EARNED ON VERIZON MASTER TRUST 4.510% 3/20/30 $1 PV ON 29055.6700 SHARES DUE 6/20/2026 $0.00376/PV ON 7,731,000.00 PV DUE 6/20/26 -----29,055.67 ---SEI 22-Jun- 26 22-Jun-26 87269AAA 8 I 310 INTEREST EARNED ON T MOBILE US 4.250% 10/21/30 $1 PV ON 23948.7500 SHARES DUE 6/20/2026 $0.00354/PV ON 6,762,000.00 PV DUE 6/20/26 -----23,948.75 ---SEI 22-Jun- 26 22-Jun-26 36273VAD 7 I 310 INTEREST EARNED ON GM FINL AM LS TR 3.880% 1/22/29 $1 PV ON 4468.4700 SHARES DUE 6/20/2026 $0.00323/PV ON 1,382,000.00 PV DUE 6/20/26 -----4,468.47 ---SEI 22-Jun- 26 22-Jun-26 36225CC 20 080088M I 310 INTEREST EARNED ON G N M A I I #080088 5.625% 6/20/27 $1 PV ON 4.2100 SHARES DUE 6/20/2026 MAY GNMA DUE 6/20/26 -----4.21 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 37 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 22-Jun- 26 22-Jun-26 36225CAZ 9 080023M I 310 INTEREST EARNED ON G N M A I I #080023 5.125% 12/20/26 $1 PV ON 1.7300 SHARES DUE 6/20/2026 MAY GNMA DUE 6/20/26 -----1.73 ---SEI 22-Jun- 26 22-Jun-26 36225CNM 4 080395M I 310 INTEREST EARNED ON G N M A I I #080395 5.625% 4/20/30 $1 PV ON 5.6100 SHARES DUE 6/20/2026 MAY GNMA DUE 6/20/26 -----5.61 ---SEI 22-Jun- 26 22-Jun-26 36225CN 28 080408M I 310 INTEREST EARNED ON G N M A I I #080408 5.625% 5/20/30 $1 PV ON 50.0900 SHARES DUE 6/20/2026 MAY GNMA DUE 6/20/26 -----50.09 ---SEI 22-Jun- 26 22-Jun-26 36225DCB 8 080965M I 310 INTEREST EARNED ON G N M A I I #080965 5.375% 7/20/34 $1 PV ON 49.1300 SHARES DUE 6/20/2026 MAY GNMA DUE 6/20/26 -----49.13 ---SEI 22-Jun- 26 22-Jun-26 89239NAD 7 TLO4728 I 310 INTEREST EARNED ON TOYOTA LEASE OWNER 4.750% 2/22/28 $1 PV ON 4378000.0000 SHARES DUE 6/20/2026 -----17,329.58 ---SEI 22-Jun- 26 20-Jun- 26 22-Jun-26 36225CN 28 080408M P 20 PAID DOWN PAR VALUE OF G N M A I I #080408 5.625% 5/20/30 MAY GNMA DUE 6/20/26 -214.2200 ----214.22 -212.04 -2.18 SEI 22-Jun- 26 20-Jun- 26 22-Jun-26 36225CNM 4 080395M P 20 PAID DOWN PAR VALUE OF G N M A I I #080395 5.625% 4/20/30 MAY GNMA DUE 6/20/26 -26.3300 ----26.33 -26.09 -0.24 SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 38 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 22-Jun- 26 20-Jun- 26 22-Jun-26 36225CAZ 9 080023M P 20 PAID DOWN PAR VALUE OF G N M A I I #080023 5.125% 12/20/26 MAY GNMA DUE 6/20/26 -73.2500 ----73.25 -74.46 --1.21 SEI 22-Jun- 26 20-Jun- 26 22-Jun-26 36225DCB 8 080965M P 20 PAID DOWN PAR VALUE OF G N M A I I #080965 5.375% 7/20/34 MAY GNMA DUE 6/20/26 -151.9200 ----151.92 -151.82 -0.10 SEI 22-Jun- 26 20-Jun- 26 22-Jun-26 36225CC 20 080088M P 20 PAID DOWN PAR VALUE OF G N M A I I #080088 5.625% 6/20/27 MAY GNMA DUE 6/20/26 -79.2500 ----79.25 -80.98 --1.73 SEI 22-Jun- 26 22-Jun- 26 22-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 58,128.6300 -----58,128.63 58,128.63 --SEI 22-Jun- 26 22-Jun- 26 22-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 17,329.5800 -----17,329.58 17,329.58 --SEI Post Date 22-Jun-26 Total ----74,912.82 --0.42 SEI 25-Jun- 26 25-Jun-26 3136AJZP 4 I 310 INTEREST EARNED ON F N M A GTD REMIC 1.500% 4/25/29 $1 PV ON 549.7200 SHARES DUE 6/25/2026 $0.00125/PV ON 439,775.04 PV DUE 6/25/26 -----549.72 ---SEI 25-Jun- 26 25-Jun-26 05592XAD 2 BVO5428 I 310 INTEREST EARNED ON BMW VEH OWNER TR 5.470% 2/25/28 $1 PV ON 1342.1600 SHARES DUE 6/25/2026 $0.00456/PV ON 294,440.94 PV DUE 6/25/26 -----1,342.16 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 39 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun-26 3137FETN 0 FHL0428B I 310 INTEREST EARNED ON F H L M C MLTCL MT 3.350% 1/25/28 $1 PV ON 23561.6600 SHARES DUE 6/25/2026 $0.00279/PV ON 8,440,000.00 PV DUE 6/25/26 -----23,561.66 ---SEI 25-Jun- 26 25-Jun-26 31397QRE 0 FNM2841 I 310 INTEREST EARNED ON F N M A GTD REMIC 2.472% 2/25/41 $1 PV ON 182.2800 SHARES DUE 6/25/2026 $0.00367/PV ON 49,638.06 PV DUE 6/25/26 -----182.28 ---SEI 25-Jun- 26 25-Jun-26 31406XWT 5 823358A I 310 INTEREST EARNED ON F N M A #823358 5.954% 2/01/35 $1 PV ON 49.8100 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----49.81 ---SEI 25-Jun- 26 25-Jun-26 3138EG6F 6 AL0869A I 310 INTEREST EARNED ON F N M A #AL0869 4.500% 6/01/29 $1 PV ON 3.9300 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----3.93 ---SEI 25-Jun- 26 25-Jun-26 31410F4V 4 888336A I 310 INTEREST EARNED ON F N M A #888336 5.000% 7/01/36 $1 PV ON 173.4900 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----173.49 ---SEI 25-Jun- 26 25-Jun-26 31376KT 22 357969A I 310 INTEREST EARNED ON F N M A #357969 5.000% 9/01/35 $1 PV ON 113.1200 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----113.12 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 40 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun-26 31406PQY 8 815971A I 310 INTEREST EARNED ON F N M A #815971 5.000% 3/01/35 $1 PV ON 133.9300 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----133.93 ---SEI 25-Jun- 26 25-Jun-26 31417YAY 3 MA0022A I 310 INTEREST EARNED ON F N M A #MA0022 4.500% 4/01/29 $1 PV ON 6.5100 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----6.51 ---SEI 25-Jun- 26 25-Jun-26 31403DJZ 3 745580A I 310 INTEREST EARNED ON F N M A #745580 5.000% 6/01/36 $1 PV ON 103.6600 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----103.66 ---SEI 25-Jun- 26 25-Jun-26 31371NUC 7 257179A I 310 INTEREST EARNED ON F N M A #257179 4.500% 4/01/28 $1 PV ON 2.5300 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----2.53 ---SEI 25-Jun- 26 25-Jun-26 31407BXH 7 826080A I 310 INTEREST EARNED ON F N M A #826080 5.000% 7/01/35 $1 PV ON 19.5300 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----19.53 ---SEI 25-Jun- 26 25-Jun-26 31403GXF 4 748678A I 310 INTEREST EARNED ON F N M A #748678 5.000% 10/01/33 $1 PV ON 1.5100 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----1.51 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 41 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun-26 3140XQTZ 0 FS8667A I 310 INTEREST EARNED ON F N M A #FS8667 3.000% 10/01/30 $1 PV ON 8233.4800 SHARES DUE 6/25/2026 MAY FNMA DUE 6/25/26 -----8,233.48 ---SEI 25-Jun- 26 25-Jun-26 3137FG6X 8 FHL3828B I 310 INTEREST EARNED ON F H L M C MLTCL MT 3.850% 5/25/28 $1 PV ON 23260.4100 SHARES DUE 6/25/2026 $0.00321/PV ON 7,250,000.00 PV DUE 6/25/26 -----23,260.41 ---SEI 25-Jun- 26 25-Jun-26 3137HDJJ 0 FHL4829B I 310 INTEREST EARNED ON F H L M C MLTCL MTG 4.803% 5/25/29 $1 PV ON 35044.2700 SHARES DUE 6/25/2026 $0.00400/PV ON 8,755,594.56 PV DUE 6/25/26 -----35,044.27 ---SEI 25-Jun- 26 25-Jun-26 3137HB3D 4 FHL5028 I 310 INTEREST EARNED ON F H L M C MLTCL 5.069% 10/25/28 $1 PV ON 45266.1700 SHARES DUE 6/25/2026 $0.00422/PV ON 10,716,000.00 PV DUE 6/25/26 -----45,266.17 ---SEI 25-Jun- 26 25-Jun-26 3137HBPD 0 FHL5429 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 5.400% 1/25/29 $1 PV ON 45000.0000 SHARES DUE 6/25/2026 $0.00450/PV ON 10,000,000.00 PV DUE 6/25/26 -----45,000.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 42 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun-26 31394JY35 FHL9543 I 310 INTEREST EARNED ON F H L M C MLTCL MT 6.49999% 9/25/43 $1 PV ON 1342.9800 SHARES DUE 6/25/2026 $0.00542/PV ON 247,935.42 PV DUE 6/25/26 -----1,342.98 ---SEI 25-Jun- 26 25-Jun-26 3137HCKV 3 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 5.180% 3/25/29 $1 PV ON 27281.3300 SHARES DUE 6/25/2026 $0.00432/PV ON 6,320,000.00 PV DUE 6/25/26 -----27,281.33 ---SEI 25-Jun- 26 25-Jun-26 3137BSRE 5 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 3.120% 9/25/26 $1 PV ON 12775.1500 SHARES DUE 6/25/2026 $0.00260/PV ON 4,913,520.45 PV DUE 6/25/26 -----12,775.15 ---SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 05592XAD 2 BVO5428 P 20 PAID DOWN PAR VALUE OF BMW VEH OWNER TR 5.470% 2/25/28 -52,420.4000 ----52,420.40 -52,411.11 -9.29 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3136AJZP 4 P 20 PAID DOWN PAR VALUE OF F N M A GTD REMIC 1.500% 4/25/29 -19,172.7600 ----19,172.76 -17,515.10 -1,657.66 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31397QRE 0 FNM2841 P 20 PAID DOWN PAR VALUE OF F N M A GTD REMIC 2.472% 2/25/41 -791.6400 ----791.64 -791.39 -0.25 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31407BXH 7 826080A P 20 PAID DOWN PAR VALUE OF F N M A #826080 5.000% 7/01/35 MAY FNMA DUE 6/25/26 -42.5800 ----42.58 -45.77 --3.19 SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 43 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun- 26 25-Jun-26 31406XWT 5 823358A P 20 PAID DOWN PAR VALUE OF F N M A #823358 5.954% 2/01/35 MAY FNMA DUE 6/25/26 -79.4000 ----79.40 -78.78 -0.62 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3138EG6F 6 AL0869A P 20 PAID DOWN PAR VALUE OF F N M A #AL0869 4.500% 6/01/29 MAY FNMA DUE 6/25/26 -37.1800 ----37.18 -39.32 --2.14 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31403DJZ 3 745580A P 20 PAID DOWN PAR VALUE OF F N M A #745580 5.000% 6/01/36 MAY FNMA DUE 6/25/26 -280.3100 ----280.31 -301.33 --21.02 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31371NUC 7 257179A P 20 PAID DOWN PAR VALUE OF F N M A #257179 4.500% 4/01/28 MAY FNMA DUE 6/25/26 -34.4900 ----34.49 -36.48 --1.99 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31406PQY 8 815971A P 20 PAID DOWN PAR VALUE OF F N M A #815971 5.000% 3/01/35 MAY FNMA DUE 6/25/26 -290.3800 ----290.38 -312.16 --21.78 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31417YAY 3 MA0022A P 20 PAID DOWN PAR VALUE OF F N M A #MA0022 4.500% 4/01/29 MAY FNMA DUE 6/25/26 -61.8400 ----61.84 -65.40 --3.56 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31376KT 22 357969A P 20 PAID DOWN PAR VALUE OF F N M A #357969 5.000% 9/01/35 MAY FNMA DUE 6/25/26 -230.6100 ----230.61 -247.91 --17.30 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31403GXF 4 748678A P 20 PAID DOWN PAR VALUE OF F N M A #748678 5.000% 10/01/33 MAY FNMA DUE 6/25/26 -3.6100 ----3.61 -3.88 --0.27 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3140XQTZ 0 FS8667A P 20 PAID DOWN PAR VALUE OF F N M A #FS8667 3.000% 10/01/30 MAY FNMA DUE 6/25/26 -110,022.9400 ----110,022.94 -108,441.36 1,581.58 -SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 44 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Jun- 26 25-Jun- 26 25-Jun-26 31410F4V 4 888336A P 20 PAID DOWN PAR VALUE OF F N M A #888336 5.000% 7/01/36 MAY FNMA DUE 6/25/26 -500.9700 ----500.97 -538.54 --37.57 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 218,446.4300 -----218,446.43 218,446.43 --SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3137HDJJ 0 FHL4829B P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 4.803% 5/25/29 -3,731.8500 ----3,731.85 -3,747.01 --15.16 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31394JY35 FHL9543 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 6.49999% 9/25/43 -1,980.2500 ----1,980.25 -2,242.63 --262.38 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 3137BSRE 5 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 3.120% 9/25/26 -82,562.7300 ----82,562.73 -85,428.22 -- 2,865.49 SEI 25-Jun- 26 25-Jun- 26 25-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 278,245.1400 -----278,245.14 278,245.14 --SEI Post Date 25-Jun-26 Total ----224,445.18 1,581.58 - 1,584.03 SEI 30-Jun- 26 30-Jun-26 91282CJQ 5 I 310 INTEREST EARNED ON U S TREASURY NT 3.750% 12/31/30 $1 PV ON 16125000.0000 SHARES DUE 6/30/2026 -----302,343.75 ---SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 45 of 46 Multiple Accounts Begin Date : 06/01/2026 End Date : 06/30/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Jun- 26 30-Jun-26 91282CHJ 3 I 310 INTEREST EARNED ON U S TREASURY NT 3.750% 6/30/30 $1 PV ON 4900000.0000 SHARES DUE 6/30/2026 -----91,875.00 ---SEI 30-Jun- 26 30-Jun-26 91282CMD 0 I 310 INTEREST EARNED ON U S TREASURY NT 4.375% 12/31/29 $1 PV ON 5750000.0000 SHARES DUE 6/30/2026 -----125,781.25 ---SEI 30-Jun- 26 30-Jun-26 91282CPR 6 I 310 INTEREST EARNED ON U S TREASURY NT 3.625% 12/31/30 $1 PV ON 13000000.0000 SHARES DUE 6/30/2026 -----235,625.00 ---SEI 30-Jun- 26 30-Jun- 26 30-Jun-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 755,625.0000 -----755,625.00 755,625.00 --SEI Post Date 30-Jun-26 Total ----755,625.00 --SEI Account 6745046601 Total ----2,628,259.79 - 243,484.1 0 450,616. 33 SEI Account Ending Cash Principal Cash: - 123,232,180.36 Income Cash: 123,232,180.36 Total Cash: - Grand Total ----- 96,583,955.1 3 - 193,739.4 0 450,616. 33 SEI TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 46 of 46 OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5009 Agenda Date:7/22/2026 Agenda Item No:5. FROM:Robert Thompson, General Manager Originator: Riaz Moinuddin, Director of Operations & Maintenance SUBJECT: COMBINATION SEWER CLEANING TRUCK REFURBISHMENT GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Sole Source Purchase Order to Haaker Equipment Company to refurbish one Combination Sewer Cleaning Truck for a total amount not to exceed $402,186, not including applicable sales tax and freight; and B. Approve a contingency of $60,328 (15%). BACKGROUND Orange County Sanitation District (OC San)owns and operates four Combination Sewer Cleaning trucks within its fleet.The trucks maintain the collection systems by cleaning sewer pipes and pump station wet wells,and by responding to emergencies such as sewer spills,using a combination of vacuum and water-jetting technology. The Combination Sewer Cleaning trucks consist of specialized cleaning equipment with controls, hydraulic systems,and a large tank debris body mounted on a chassis.These trucks service more than 380 miles of regional pipes and 15 outlying pump stations,three reliable units are required to complete the annual volume of work and comply with the Sewer System Management Plan (SSMP) as required by the State Water Resources Control Board (SWRCB). RELEVANT STANDARDS ·Participate in local, state, and national cooperative purchasing programs ·Maintain a proactive asset management program ·Ensure the public’s money is wisely spent PROBLEM The truck identified for refurbishment is experiencing increasing electrical,mechanical,and hydraulic failures due to age and corrosion.Continued repairs are becoming less effective and cost-efficient, making refurbishment or replacement the only viable long-term options. Orange County Sanitation District Printed on 7/13/2026Page 1 of 3 powered by Legistar™ File #:2026-5009 Agenda Date:7/22/2026 Agenda Item No:5. PROPOSED SOLUTION Refurbish the truck through the Original Equipment Manufacturer (OEM)-authorized service representative to restore the equipment to near-new condition,improve reliability,and maximize its remaining useful life at a lower cost than replacement. TIMING CONCERNS Delaying the refurbishment would increase the risk of equipment downtime and reduce OC San’s ability to maintain adequate fleet availability of Combination Sewer Cleaning trucks to support scheduled cleaning, emergency response and regulatory compliance activities. RAMIFICATIONS OF NOT TAKING ACTION Continued deterioration of the truck could result in extended downtime,increased reliance on rental equipment,higher maintenance costs,and reduced fleet availability.This could impair OC San’s ability to perform scheduled cleaning activities and respond effectively to collection system emergencies. PRIOR COMMITTEE/BOARD ACTIONS August 2017 -Approved Vactor as an Original Equipment Manufacturer (OEM)Sole Source for industrial cleaning truck rental and repairs. ADDITIONAL INFORMATION OC San’s Board of Directors approved Vactor as the OEM sole source provider under Board M.O.9 (B)on August 23,2017.Haaker Equipment Company is Vactor’s sole authorized dealer for Vactor in Southern California.By using the OEM-authorized dealer and OEM parts,OC San received a discount of $37,730. The truck profiled for refurbishment is seven years old and has a reliably operating chassis.The installed equipment on the chassis will be restored to near-new condition,allowing OC San to operate the unit well into its profiled 15-year life cycle.Refurbishment is significantly less costly than replacing the vehicle and allows OC San to extend the useful life of an existing asset with a serviceable chassis. With newly adopted and imposed regulations (CARB Advanced Clean Fleets)affecting heavy-duty vehicles,the unit would need to be replaced as an alternative-fueled/electric vehicle at a substantially higher cost in a market with supply chain delays.Keeping this unit in OC San’s fleet ensures the reliability of critical equipment for maintaining the collection system. A 15%contingency is recommended to address any additional repairs or replacement components identified during the refurbishment process. CEQA N/A Orange County Sanitation District Printed on 7/13/2026Page 2 of 3 powered by Legistar™ File #:2026-5009 Agenda Date:7/22/2026 Agenda Item No:5. FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2026-27 and 2027-28,Section 8,Page 82),and the budget is sufficient for the recommended action. Date of Approval Contract Amount Contingency 07/22/2026 $402,186 $60,328 (15%) ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: N/A Orange County Sanitation District Printed on 7/13/2026Page 3 of 3 powered by Legistar™ OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5010 Agenda Date:7/22/2026 Agenda Item No:6. FROM:Robert Thompson, General Manager Originator: Riaz Moinuddin, Director of Operations & Maintenance SUBJECT: GAS COMPRESSOR INTERCOOLERS CRITICAL SPARES GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Sole Source Purchase Order to NEAC Compressor Service USA, Inc., for the procurement of two spare intercoolers for digester gas compressors in an amount not to exceed $246,754, not including applicable sales tax and freight; and B. Approve a contingency of $24,675 (10%). BACKGROUND The Orange County Sanitation District (OC San)operates six gas compressors between Plant Nos.1 and 2 to increase the compression of methane gas generated during the anaerobic digestion process.The compressed gas is transferred to the Central Generation facilities,where it fuels the engine-generator units to produce electricity for both treatment plants. The intercoolers are integral to maintaining equipment reliability and the continued operation of the gas compressors. NEAC Compressor Service USA,Inc.(NEAC)is the Board of Directors approved original equipment manufacturer (OEM)representative and the sole authorized distributor of compressor equipment and replacement parts.As the sole authorized source for these OEM intercoolers,NEAC ensures compliance with manufacturer specifications and compatibility with the existing compressor systems. RELEVANT STANDARDS ·Protect OC San assets ·24/7/365 treatment plant reliability ·Maintain a proactive asset management program PROBLEM Due to the corrosive gases processed and their environments,the gas compressors intercoolers are susceptible to corrosion,resulting in reduced performance and reliability over time.ExistingOrange County Sanitation District Printed on 7/13/2026Page 1 of 3 powered by Legistar™ File #:2026-5010 Agenda Date:7/22/2026 Agenda Item No:6. susceptible to corrosion,resulting in reduced performance and reliability over time.Existing intercoolers are showing early signs of corrosion and performance degradation.OC San currently has no spare intercoolers in inventory,and replacement units require a minimum lead time of 22 weeks.In the event of failure,the affected compressor could remain out of service for an extended period, increasing the risk of process disruptions and reduced plant reliability. PROPOSED SOLUTION Approve the purchase of two OEM intercoolers from NEAC to maintain gas compressor reliability, support planned compressor overhauls,and minimize downtime associated with equipment failure or maintenance activities. TIMING CONCERNS Timely procurement of the spare intercoolers is necessary to support planned digester gas compressor overhauls.Due to the lead time associated with these specialized OEM components, delays in procurement may affect equipment availability, overhaul scheduling, and plant reliability. RAMIFICATIONS OF NOT TAKING ACTION Failure to maintain an adequate inventory of critical spare parts could result in extended gas compressor downtime,reducing the availability of digester gas compression and impacting electrical power generation for both treatment plants.Prolonged equipment outages may also adversely affect plant operations and OC San’s ability to maintain compliance with operational and regulatory permit requirements. PRIOR COMMITTEE/BOARD ACTIONS May 2020 -Approved Penn Process Compressors (vendor NEAC Compressor Service USA)as an Original Equipment Manufacturer (OEM) Sole Source provider for pistons and parts. ADDITIONAL INFORMATION NEAC is the Board of Directors approved OEM representative and the sole authorized distributor for equipment and replacement components. CEQA N/A FINANCIAL CONSIDERATIONS This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2026-2027 and 2027-2028),Section 6,Page 124,Repairs &Maintenance) and the budget is sufficient for the recommended action. Date of Approval Contract Amount Contingency 07/22/2026 $246,754 $24,675 (10%)Orange County Sanitation District Printed on 7/13/2026Page 2 of 3 powered by Legistar™ File #:2026-5010 Agenda Date:7/22/2026 Agenda Item No:6. Date of Approval Contract Amount Contingency 07/22/2026 $246,754 $24,675 (10%) ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·N/A SP:at:dh:mm Orange County Sanitation District Printed on 7/13/2026Page 3 of 3 powered by Legistar™ OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5011 Agenda Date:7/22/2026 Agenda Item No:7. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: ON-CALL CONDITION ASSESSMENT PROGRAM SUPPORT SERVICES,SPECIFICATION NO.S -2026-720BD GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Services Contract with Jamison Engineering Contractors, Inc. to provide on-call condition assessment program support services, Specification No. S-2026-720BD, for the period of August 1, 2026, through June 30, 2027, for a total amount not to exceed $1,114,638 with four (4) one-year renewal options; B. Approve an annual increase not to exceed 3.5% of the previous year’s amount; and C. Approve an annual contingency not to exceed 10% of the annual contract amount for all renewal periods. BACKGROUND Orange County Sanitation District (OC San)utilizes contractor services to support the performance of critical equipment and facility condition assessments.Condition assessments are a key component of OC San’s Asset Management Program as they provide vital information related to the current status of critical equipment,structures,and facilities throughout both reclamation plants and the collection system.This information is utilized to determine remaining useful life and impacts the planning and execution of maintenance efforts and capital projects. Condition assessments often occur in challenging locations.These locations may include confined spaces,areas that require heavy cleaning or grit removal,spaces that require labor or equipment to access (i.e.an area secured by a hatch or gate),and areas that can only be feasibly inspected via methods or technology not readily available to staff.Utilizing a contractor to support these efforts provides effective execution in a safe, reliable manner. In addition,during the performance of a condition assessment,minor issues may be encountered that require repair.Enabling the performance of incidental repairs at the time of the assessment prevents these issues from worsening,minimizes operational impacts,and prevents duplicative efforts necessary to access and prepare the area to perform the work. Orange County Sanitation District Printed on 7/13/2026Page 1 of 4 powered by Legistar™ File #:2026-5011 Agenda Date:7/22/2026 Agenda Item No:7. RELEVANT STANDARDS ·Protect OC San assets ·Maintain a proactive asset management program ·24/7/365 treatment plant reliability PROBLEM The current on-call contractor support services contract expires on October 31,2026.Without a new contract in place,performance of planned assessments cannot be executed efficiently,and the asset management program will be impacted. PROPOSED SOLUTION Approve a Services Contract with Jamison Engineering Contractors,Inc.to provide on-call contractor support services for OC San’s condition assessment program. TIMING CONCERNS The current contract will expire on October 31,2026.Having a new on-call contractor support services contract in place prior to the current contract’s expiration will ensure that planned condition assessments are not impacted. RAMIFICATIONS OF NOT TAKING ACTION If no action is taken,planned condition assessments will be delayed,impacting the effectiveness of the asset management program.Separate procurements for support services would be required on a case-by-case basis; this is less efficient and requires more resources to manage and execute. PRIOR COMMITTEE/BOARD ACTIONS N/A ADDITIONAL INFORMATION A Request for Proposal (RFP)was advertised on March 17,2026,for Condition Assessment On-Call Contractor Support Services and was available to firms that were registered on the OC San Bidding System.The RFP indicated that award would be made to up to two proposers that meet the minimum qualification requirements.A non-mandatory pre-proposal meeting was conducted virtually on March 31, 2026. The following evaluation criteria were described in the RFP and used to determine the most qualified company. Orange County Sanitation District Printed on 7/13/2026Page 2 of 4 powered by Legistar™ File #:2026-5011 Agenda Date:7/22/2026 Agenda Item No:7. CRITERION WEIGHT 1. Qualifications & Experience of Firm 200 Points 2. Proposed Staffing & Project Organization 300 Points 3. Work Plan 300 Points 4. Cost 200 Points One proposal was received on April 16,2026,and evaluated in accordance with OC San’s policies and procedures by a team consisting of an OC San Engineer,Operations Supervisor,Maintenance Superintendent,and Principal Safety &Health Specialist.A purchasing representative chaired the team as a non-voting member. The evaluation team first reviewed and scored the proposal based upon the criteria listed above, other than cost. Criterion 1 (Max 200) Criterion 2 (Max 300) Criterion 3 (Max 300) Subtotal Score (Max 800) Jamison Engineering Contractors, Inc. 176 246 265 687 Staff determined that Jamison Engineering Contractors,Inc.,is qualified based on the firm’s and project team’s qualifications and safety records.They have the appropriate relevant experience with OC San and other agencies conducting similar work.Their approach and understanding of the work were determined to be satisfactory. The proposal was accompanied by a sealed cost proposal.The cost proposal was opened and negotiated. Rank Proposer Subtotal Score Without cost (Max 800) Cost (Max 200) Subtotal Score (Max 800) 1.Jamison Engineering Contractors, Inc. 687 200 887 After a complete evaluation,Jamison Engineering Contractors,Inc.,was invited to submit a Best and Final Offer (BAFO). The submitted BAFO remained unchanged from the originally submitted cost. Rank Proposer Original Cost Best and Final Offer 1.Jamison Engineering Contractors, Inc. $1,114,638 $1,114,638 Staff recommends approval of a Services Contract with Jamison Engineering Contractors,Inc.for an amount not to exceed $1,114,638 for the period from August 1,2026,through June 30,2027,with four (4)one-year renewal options aligned with the subsequent fiscal years and with up to an annual escalation of 3.5% and an annual contingency of 10%. Orange County Sanitation District Printed on 7/13/2026Page 3 of 4 powered by Legistar™ File #:2026-5011 Agenda Date:7/22/2026 Agenda Item No:7. CEQA This is not a project as defined by the California Environmental Quality Act (CEQA),therefore CEQA does not apply. FINANCIAL CONSIDERATIONS This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2026-27 and 2027-28,Section 6,Page 79)and the budget is sufficient for the recommended action. Date of Approval Contract Amount Contingency 07/22/2026 $1,114,638 $111,464 (10%) ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Services Contract Orange County Sanitation District Printed on 7/13/2026Page 4 of 4 powered by Legistar™ Services Contract 1 of 11 Specification No. S-2026-720BD Revision 121924 SERVICES CONTRACT ON-CALL CONDITION ASSESSMENT PROGRAM SUPPORT SERVICES Specification No. S-2026-720BD This SERVICES CONTRACT (hereinafter referred to as “Contract”), is made and entered into as of the date fully executed below, by and between Orange County Sanitation District (hereinafter referred to as “OC San”) and Jamison Engineering Contractors, Inc. (hereinafter referred to as “Contractor”), and collectively referred to herein as the “Parties.” R E C I T A L S WHEREAS, OC San desires to retain the services of Contractor for On-call Condition Assessment Program Support Services (“Services”) as described in Exhibit “A” attached hereto and incorporated herein by this reference; and WHEREAS, Contractor is qualified to perform the Services by virtue of experience, training, education, and expertise; and WHEREAS, OC San desires to engage Contractor to provide the Services; and WHEREAS, OC San selected Contractor to provide the Services in accordance with OC San’s current Purchasing Ordinance; and WHEREAS, on July 22, 2026, OC San’s Board of Directors of OC San, by minute order, authorized execution of this Contract. NOW, THEREFORE, in consideration of the above recitals and the mutual promises and benefits specified below, the Parties agree as follows: 1. General. 1.1 This Contract and all exhibits hereto are made by OC San and Contractor. The terms and conditions herein exclusively govern the purchase of Services as described in Exhibit “A”. 1.2 The term “Task Order”, when referenced under this Contract, shall mean an order issued by the OC San Project Manager or designee for a specific scope of work. 1.3 Task Orders issued under this Contract shall be incorporated by reference and made part hereof, upon issuance of the Task Order. 1.4 The following exhibits, in order of precedence, are incorporated by reference and made part of this Contract. Exhibit “A” – Scope of Work Exhibit “B” – Proposal Exhibit “C” – Determined Insurance Requirement Form Exhibit “D” – Contractor Safety Standards Exhibit “E” – Human Resources Policies Exhibit “F” – General Conditions Services Contract 2 of 11 Specification No. S-2026-720BD Revision 121924 1.5 In the event of any conflict or inconsistency between the provisions of this Contract and any of the provisions of the exhibits hereto, the provisions in the Contract shall control and thereafter the provisions in the document highest in precedence shall be controlling. 1.6 The provisions of this Contract and attachments hereto are applicable at the Task Order level. 1.7 Except as expressly provided otherwise, OC San accepts no liability for any expenses, losses, or actions incurred or undertaken by Contractor as a result of work performed in anticipation of acquisition of the Services by OC San. 1.8 Work Hours: Shall be as specified in Exhibit “A.” 1.9 Days: Shall mean calendar days, unless otherwise noted. 1.10 OC San holidays (non-working days) are as follows: New Year’s Day, Martin Luther King, Jr. Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Day after Thanksgiving, Christmas Eve, and Christmas Day. 1.11 Work: Shall mean all work, labor, and materials necessary to provide the Services. 1.12 The provisions of this Contract and provisions of the Task Orders may be amended or waived only by an amendment executed by authorized representatives of both Parties. 1.13 The various headings in this Contract are inserted for convenience only and shall not affect the meaning or interpretation of this Contract or any paragraph or provision hereof. 2. Scope of Work. 2.1 Contractor shall perform the Services identified in Exhibit “A” in accordance with generally accepted industry and professional standards. 2.2 Modifications to Scope of Work. OC San shall have the right to modify the Scope of Work at any time. All modifications must be made by an amendment signed by both Parties. 2.3 Familiarity with Work. By executing this Contract, Contractor warrants that: (a) it has investigated the work to be performed; and (b) it understands the facilities, difficulties, and restrictions of the work under this Contract. Should Contractor discover any latent or unknown condition materially differing from those inherent in the work or as represented by OC San, it shall immediately inform OC San of this and shall not proceed, except at Contractor’s risk, until written instructions are received from OC San. 2.4 Performance. Time is of the essence in the performance of the provisions hereof. 3. Contract Term. The term of this Contract shall be for eleven months commencing on August 1, 2026 and continuing through June 30, 2027. 3.1 Renewals. At its sole discretion, OC San may exercise the option to renew this Contract for up to four (4) one-year periods. This Contract may be renewed by an OC San Purchase Order. OC San shall have no obligation to renew the Contract nor to give a reason if it elects not to renew it. Services Contract 3 of 11 Specification No. S-2026-720BD Revision 121924 3.2 Extensions. The term of this Contract may be extended only by an amendment signed by both Parties. 4. Compensation. 4.1 As compensation for the Services provided under this Contract, OC San shall pay Contractor a total amount not to exceed (NTE) One Million One Hundred Fourteen Thousand Six Hundred Thirty-Eight Dollars ($1,114,638.00), as specified in Exhibit B. 4.2 Contractor shall provide OC San with all required premiums and/or overtime work at no charge beyond the amount specified above. 5. Payments and Invoicing. 5.1 OC San shall pay itemized invoices for work completed in accordance with Exhibit “A” thirty (30) days from receipt of the invoice and after approval by OC San’s Project Manager or designee. OC San shall be the determining party, in its sole discretion, as to whether the Services have been satisfactorily completed. 5.2 Contractor shall submit its invoices to OC San Accounts Payable by electronic mail to APStaff@OCSan.gov. In the subject line include “INVOICE” and the Purchase Order Number. 6. California Department of Industrial Relations Registration and Record of Wages. 6.1 To the extent Contractor’s employees and/or its subcontractors perform work related to this Contract for which Prevailing Wage Determinations have been issued by the California Department of Industrial Relations (DIR) as more specifically defined under Labor Code section 1720 et seq., prevailing wages are required to be paid for applicable work under this Contract. It is Contractor’s responsibility to interpret and implement any prevailing wage requirements and Contractor agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws. 6.2 Contractor and its subcontractors shall comply with the registration requirements of Labor Code section 1725.5. Pursuant to Labor Code section 1771.4(a)(1), the work is subject to compliance monitoring and enforcement by the California Department of Industrial Relations (DIR). 6.3 Pursuant to Labor Code section 1773.2, a copy of the prevailing rate of per diem wages is available upon request at OC San’s principal office. The prevailing rate of per diem wages may also be found at the DIR website for prevailing wage determinations at http://www.dir.ca.gov/DLSR/PWD. 6.4 Contractor and its subcontractors shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations section 16461(e). Pursuant to Labor Code sections 1773.2 and 1771.4(a)(2), Contractor shall post a copy of the prevailing rate of per diem wages at the job site. 6.5 Contractor and its subcontractors shall maintain accurate payroll records and shall comply with all the provisions of Labor Code section 1776. Contractor and its subcontractors shall submit payroll records to the Labor Commissioner pursuant to Labor Code section 1771.4(a)(3). Pursuant to Labor Code section 1776, Contractor and its Services Contract 4 of 11 Specification No. S-2026-720BD Revision 121924 subcontractors shall furnish a copy of all certified payroll records to OC San and/or the general public upon request, provided the public request is made through OC San, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement of the Department of Industrial Relations. Pursuant to Labor Code section 1776(h), penalties for non-compliance with a request for payroll records may be deducted from progress payments. 6.5.1 As a condition to receiving payments, Contractor agrees to present to OC San, along with any request for payment, all applicable and necessary certified payrolls and other required documents for the period covering such payment request. Pursuant to Title 8, California Code of Regulations section 16463, OC San shall withhold any portion of a payment, up to and including the entire payment amount, until certified payroll forms and any other required documents are properly submitted. In the event certified payroll forms do not comply with the requirements of Labor Code section 1776, OC San may continue to withhold sufficient funds to cover estimated wages and penalties under the Contract. 6.6 Contractor and its subcontractors shall comply with Labor Code section 1774 and section 1775. Pursuant to Labor Code section 1775, Contractor and any of its subcontractors shall forfeit to OC San a penalty of not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any work. 6.6.1 In addition to the penalty and pursuant to Labor Code section 1775, the difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by Contractor or its subcontractor. 6.7 Contractor and its subcontractors shall comply with Labor Code sections 1810 through 1815. Contractor and its subcontractors shall restrict working hours to eight (8) hours per day and forty (40) hours per week, except that work performed in excess of those limits shall be permitted upon compensation for all excess hours worked at not less than one and one-half (1.5) times the basic rate of pay, as provided in Labor Code section 1815. Contractor shall forfeit, as a penalty to OC San, twenty-five dollars ($25) per worker per calendar day during which such worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of Labor Code sections 1810 through 1815. 6.8 Contractor and its subcontractors shall comply with Labor Code sections 1777.5, 1777.6, and 1777.7 concerning the employment of apprentices by Contractor or any subcontractor. 6.9 Contractor shall include, at a minimum, a copy of the following provisions in any contract it enters into with any subcontractor: Labor Code sections 1771, 1771.1, 1775, 1776, 1777.5, 1810, 1813, 1815, 1860, and 1861. 6.10 Pursuant to Labor Code sections 1860 and 3700, Contractor and its subcontractors will be required to secure the payment of compensation to employees. Pursuant to Labor Code section 1861, Contractor, by accepting this contract, certifies that: Services Contract 5 of 11 Specification No. S-2026-720BD Revision 121924 “I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” Contractor shall ensure that all its contracts with its subcontractors provide the provision above. 7. Davis-Bacon Act. Not Used. 8. Damage to OC San’s Property. Any of OC San’s property damaged by Contractor, any subcontractor, or by the personnel of either will be subject to repair or replacement by Contractor at no cost to OC San. 9. Freight (F.O.B. Destination). Contractor assumes full responsibility for all transportation, transportation scheduling, packing, handling, insurance, and other services associated with delivery of all products deemed necessary under this Contract. 10. Audit Rights. Contractor agrees that, during the term of this Contract and for a period of three (3) years after its expiration or termination, OC San shall have access to and the right to examine any directly pertinent books, documents, and records of Contractor relating to the invoices submitted by Contractor pursuant to this Contract. 11. Contractor Safety Standards and Human Resources Policies. OC San requires Contractor and its subcontractor(s) to follow and ensure their employees follow all Federal, State, and local regulations as well as the Contractor Safety Standards while working at OC San locations. If, during the course of the Contract, it is discovered that the Contractor Safety Standards do not comply with Federal, State, or local regulations, Contractor is required to follow the most stringent regulatory requirement at no additional cost to OC San. Contractor, its subcontractors, and all of their employees shall adhere to the safety requirements in Exhibit “A,” all applicable Contractor Safety Standards in Exhibit “D,” and the Human Resources Policies in Exhibit “E.” 12. Insurance. Contractor and all its subcontractors shall purchase and maintain, throughout the term of this Contract and any periods of warranty or extensions, insurance in amounts equal to the requirements set forth in the signed Exhibit “C” – Determined Insurance Requirement Form. Contractor shall not commence work under this Contract until all required insurance is obtained in a form acceptable to OC San, nor shall Contractor allow any subcontractor to commence service pursuant to a subcontract until all insurance required of the subcontractor has been obtained. Failure to obtain and maintain the required insurance coverage shall result in termination of this Contract. 13. Bonds. Not Used. 14. Indemnification and Hold Harmless Provision. Contractor shall assume all responsibility for damages to property and/or injuries to persons, including accidental death, which may arise out of or may be caused by Contractor’s Services under this Contract, or by its subcontractor(s), or by anyone directly or indirectly employed by Contractor, and whether such damage or injury shall accrue or be discovered before or after the termination of the Contract. Except as to the sole active negligence of or willful misconduct of OC San, Contractor shall Services Contract 6 of 11 Specification No. S-2026-720BD Revision 121924 indemnify, protect, defend, and hold harmless OC San, its elected and appointed officials, officers, agents, and employees from and against any and all claims, liabilities, damages, or expenses of any nature, including attorneys’ fees: (a) for injury to or death of any person, or damage to property, or interference with the use of property arising out of or in connection with Contractor’s performance under the Contract, and/or (b) on account of use of any copyrighted or uncopyrighted material, composition, or process; or any patented or unpatented invention, article, or appliance furnished or used under the Contract, and/or (c) on account of any goods and services provided under this Contract. This indemnification provision shall apply to any acts or omissions, willful misconduct, or negligent misconduct, whether active or passive, on the part of Contractor or anyone employed by or working under Contractor. To the maximum extent permitted by law, Contractor’s duty to defend shall apply whether or not such claims, allegations, lawsuits, or proceedings have merit or are meritless; or which involve claims or allegations that any of the parties to be defended were actively, passively, or concurrently negligent; or which otherwise assert that the parties to be defended are responsible, in whole or in part, for any loss, damage, or injury. Contractor agrees to provide this defense immediately upon written notice from OC San, and with well qualified, adequately insured, and experienced legal counsel acceptable to OC San. This section shall survive the expiration or early termination of the Contract. 15. Independent Contractor. The relationship between the Parties hereto is that of an independent contractor and nothing herein shall be deemed to make Contractor an OC San employee. During the performance of this Contract, Contractor and its officers, employees, and agents shall act in an independent capacity and shall not act as OC San’s officers, employees, or agents. Contractor and its officers, employees, and agents shall obtain no rights to any benefits which accrue to OC San’s employees. 16. Subcontracting and Assignment. Contractor shall not delegate any duties nor assign any rights under this Contract without the prior written consent of OC San. Any such attempted delegation or assignment shall be void. 17. Disclosure. Contractor agrees not to disclose, to any third party, data or information generated from this Contract without the prior written consent from OC San. 18. Non-Liability of OC San Officers and Employees. No officer or employee of OC San shall be personally liable to Contractor, or any successor-in-interest, in the event of any default or breach by OC San, or for any amount which may become due to Contractor or to its successor, or for breach of any obligation under the terms of this Contract. 19. Third-Party Rights. Nothing in this Contract shall be construed to give any rights or benefits to anyone other than OC San and Contractor. 20. Applicable Laws and Regulations. Contractor shall comply with all applicable Federal, State, and local laws, rules, and regulations. Contractor also agrees to indemnify and hold OC San harmless from any and all damages and liabilities assessed against OC San as a result of Contractor’s noncompliance therewith. Any provision required by law to be included herein shall be deemed included as a part of this Contract whether or not specifically included or referenced. 21. Licenses, Permits, Ordinances, and Regulations. Contractor represents and warrants to OC San that it has obtained all licenses, permits, qualifications, and approvals of whatever nature that are legally required to provide the Services. Any and all fees required by Federal, Services Contract 7 of 11 Specification No. S-2026-720BD Revision 121924 State, County, City, and/or municipal laws, codes, and/or tariffs that pertain to the work performed under this Contract will be paid by Contractor. 22. Regulatory Requirements. Contractor shall perform all work under this Contract in strict conformance with applicable Federal, State, and local regulatory requirements including, but not limited to, 40 CFR 122, 123, 124, 257, 258, 260, 261, and 503, Title 22, 23, and Water Codes Division 2. 23. Environmental Compliance. Contractor shall, at its own cost and expense, comply with all Federal, State, and local environmental laws, regulations, and policies which apply to Contractor, its subcontractors, and the Services, including, but not limited to, all applicable Federal, State, and local air pollution control laws and regulations. 24. South Coast Air Quality Management District’s Requirements. It is Contractor’s responsibility to ensure that all equipment furnished and installed be in accordance with the latest rules and regulations of the South Coast Air Quality Management District (SCAQMD). All Contract work practices, which may have associated emissions such as sandblasting, open field spray painting, or demolition of asbestos containing components or structures shall comply with the appropriate rules and regulations of SCAQMD. 25. California Air Resources Board Mobile Source Regulations. Contractor and its applicable consultants, subconsultants, and subcontractors shall comply with the following California Air Resources Board Mobile Source Regulations: • Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6 • Truck & Bus Regulation (T&B): 13 CCR 2025 • Clean Truck Check (CTC): 13 CCR 2195-2199.1 • Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2 26. California Voluntary Protection Program Annual Reporting Requirement. If Contractor will potentially work 1,000 combined hours in a quarter, for the term of the Agreement, Contractor shall provide an annual report detailing its safety and health information, including, but not limited to, its total number of employees, work hours, number of injuries and illnesses, and number of injury and illness cases involving days away from work, restricted work activity and/or job transfer. Contractor shall furnish this report to OC San no later than January 20th each calendar year. Failure to provide this data by the required due date may result in suspension of Contractor’s services with OC San. Any delay arising out of or resulting from such suspension shall be Contractor’s sole responsibility and considered Contractor caused delay, which shall not be compensable by OC San. 27. Warranties. In addition to the warranties stated in Exhibit “A,” the following shall apply: 27.1 Manufacturer’s standard warranty shall apply. All manufacturer warranties shall commence on the date of acceptance of the work as complete by the OC San Project Manager or designee. 27.2 Contractor’s Warranty (Guarantee): If within a one (1) year period of completion of all work specified in Exhibit “A,” OC San informs Contractor that any portion of the Services provided fails to meet the standards required under this Contract, Contractor shall, within the time agreed to by OC San and Contractor, take all such actions as are necessary to Services Contract 8 of 11 Specification No. S-2026-720BD Revision 121924 correct or complete the noted deficiency(ies) at Contractor's sole expense. 28. Dispute Resolution. 28.1 In the event of a dispute as to the construction or interpretation of this Contract, or any rights or obligations hereunder, the Parties shall first attempt, in good faith, to resolve the dispute by mediation. The Parties shall mutually select a mediator to facilitate the resolution of the dispute. If the Parties are unable to agree on a mediator, the mediation shall be conducted in accordance with the Commercial Mediation Rules of the American Arbitration Agreement, through the alternate dispute resolution procedures of Judicial Arbitration through Mediation Services of Orange County (“JAMS”), or any similar organization or entity conducting an alternate dispute resolution process. 28.2 In the event the Parties are unable to timely resolve the dispute through mediation, the issues in dispute shall be submitted to arbitration pursuant to Code of Civil Procedure, Part 3, Title 9, sections 1280 et seq. For such purpose, an agreed arbitrator shall be selected, or in the absence of agreement, each party shall select an arbitrator, and those two (2) arbitrators shall select a third. Discovery may be conducted in connection with the arbitration proceeding pursuant to Code of Civil Procedure section 1283.05. The arbitrator, or three (3) arbitrators acting as a board, shall take such evidence and make such investigation as deemed appropriate and shall render a written decision on the matter in question. The arbitrator shall decide each and every dispute in accordance with the laws of the State of California. The arbitrator’s decision and award shall be subject to review for errors of fact or law in the Superior Court for the County of Orange, with a right of appeal from any judgment issued therein. 29. Liquidated Damages. Not Used. 30. Remedies. In addition to other remedies available in law or equity, if Contractor fails to make delivery of the goods and Services or repudiates its obligations under this Contract, or if OC San rejects the goods or Services or revokes acceptance of the goods and Services, OC San may (a) cancel the Contract; (b) recover whatever amount of the purchase price OC San has paid, and/or (c) “cover” by purchasing, or contracting to purchase, substitute goods and Services for those due from Contractor. In the event OC San elects to “cover” as described in (c), OC San shall be entitled to recover from Contractor as damages the difference between the cost of the substitute goods and Services and the Contract price, together with any incidental or consequential damages. 31. Force Majeure. Neither party shall be liable for delays caused by accident, flood, acts of God, fire, labor trouble, war, acts of government, or any other cause beyond its control, but the affected party shall use reasonable efforts to minimize the extent of the delay. Work affected by a force majeure condition may be rescheduled by mutual consent of the Parties. 32. Termination. 32.1 OC San reserves the right to terminate this Contract for its convenience, with or without cause, in whole or in part, at any time, by written notice from OC San. Upon receipt of a termination notice, Contractor shall immediately discontinue all work under this Contract (unless the notice directs otherwise). OC San shall thereafter, within thirty (30) days, pay Contractor for work performed (cost and fee) through the date of termination. Contractor expressly waives any claim to receive anticipated profits to be earned during the uncompleted portion of this Contract. Such notice of termination shall terminate this Services Contract 9 of 11 Specification No. S-2026-720BD Revision 121924 Contract and release OC San from any further fee, cost, or claim hereunder by Contractor other than for work performed through the date of termination. 32.2 OC San reserves the right to terminate this Contract immediately upon OC San’s determination that Contractor is not complying with the Scope of Work requirements, if the level of service is inadequate, or for any other default of this Contract. 32.3 OC San may also immediately terminate this Contract for default, in whole or in part, by written notice to Contractor: ▪ if Contractor becomes insolvent or files a petition under the Bankruptcy Act; or ▪ if Contractor sells its business; or ▪ if Contractor breaches any of the terms of this Contract; or ▪ if the total amount of compensation exceeds the amount authorized under this Contract. 32.4 All OC San’s property in the possession or control of Contractor shall be returned by Contractor to OC San on demand or at the expiration or early termination of this Contract, whichever occurs first. 33. Attorney’s Fees. If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Contract, the prevailing party shall be entitled to reasonable attorney’s fees, costs, and necessary disbursements in addition to any other relief to which the prevailing party may be entitled. 34. Waiver. The waiver by either party of any breach or violation of, or default under, any provision of this Contract shall not be deemed a continuing waiver by such party of any other provision or of any subsequent breach or violation of this Contract or default thereunder. Any breach by Contractor to which OC San does not object shall not operate as a waiver of OC San’s rights to seek remedies available to it for any subsequent breach. 35. Severability. If any section, subsection, or provision of this Contract; or any agreement or instrument contemplated hereby; or the application of such section, subsection, or provision is held invalid, the remainder of this Contract or instrument in the application of such section, subsection, or provision to persons or circumstances other than those to which it is held invalid, shall not be affected thereby, unless the effect of such invalidity shall be to substantially frustrate the expectations of the Parties. 36. Survival. The provisions of this Contract dealing with payment, warranty, indemnity, and forum for enforcement shall survive expiration or early termination of this Contract. 37. Governing Law. This Contract shall be governed by and interpreted under the laws of the State of California and the Parties submit to jurisdiction in the County of Orange in the event any action is brought in connection with this Contract or the performance thereof. 38. Notices. 38.1 All notices under this Contract must be in writing. Written notice shall be delivered by personal service, by electronic telecommunication, or sent by registered or certified mail, postage prepaid, return receipt requested, or by any other overnight delivery service which delivers to the noticed destination and provides proof of delivery to the sender. Services Contract 10 of 11 Specification No. S-2026-720BD Revision 121924 Rejection or other refusal to accept or the inability to deliver because of changed address for which no notice was given as provided hereunder shall be deemed to be receipt of the notice, demand, or request sent. All notices shall be effective when first received at the following addresses: OC San: Donald Herrera Senior Buyer Orange County Sanitation District 18480 Bandilier Circle Fountain Valley, CA 92708 dherrera@ocsan.gov Contractor: Don Jamison President Jamison Engineering 2525 S. Yale Street Santa Ana, CA 92704 jamisoneng@msn.com 38.2 Each party shall provide the other party written notice of any change in address as soon as practicable. 39. Read and Understood. By signing this Contract, Contractor represents that it has read and understood the terms and conditions of the Contract. 40. Authority to Execute. The persons executing this Contract on behalf of the Parties warrant that they are duly authorized to execute this Contract and that by executing this Contract, the Parties are formally bound. 41. Entire Agreement. This Contract constitutes the entire agreement of the Parties and supersedes all prior written or oral communications and all contemporaneous oral agreements, understandings, and negotiations between the Parties with respect to the subject matter hereof. [Intentionally left blank. Signatures follow on the next page.] Services Contract 11 of 11 Specification No. S-2026-720BD Revision 121924 IN WITNESS WHEREOF, intending to be legally bound, the Parties hereto have caused this Contract to be signed by their duly authorized representatives. ORANGE COUNTY SANITATION DISTRICT Dated: _________________ By: Christine Marick Vice-Chairwoman, Board of Directors Dated: _________________ By: Kelly A. Lore Clerk of the Board Dated: _________________ By: Kevin Work Purchasing & Contracts Manager Jamison Engineering Contractors, Inc. Dated: _________________ By: Print Name and Title of Officer DH EXHIBIT A Specification No. S-2026-720BD EXHIBIT A SCOPE OF WORK For On-Call Condition Assessment Program Support Services EXHIBIT A SCOPE OF WORK ON-CALL CONDITION ASSESSMENT PROGRAM SUPPORT SERVICES SPECIFICATION NO. S-2026-720BD TABLE OF CONTENTS I. ORGANIZATIONAL INFORMATION .......................................................................... 3 II. SUMMARY .................................................................................................................. 3 III. BACKGROUND, PROJECT DESCRIPTION, AND PROJECT ELEMENTS .............. 4 A. BACKGROUND ............................................................................................................... 4 B. GENERAL PROJECT DESCRIPTION ............................................................................. 4 C. PROJECT ELEMENTS .................................................................................................... 6 I. PROJECT ELEMENT 1 – CONFINED SPACE ENTRY SUPPORT WITH SCBA, SUPPLIED AIR, OR DRAGER BG-4 RE-BREATHER APPARATUS ................................................. 6 II. PROJECT ELEMENT 2 – CONFINED SPACE ENTRY SUPPORT (NON SCBA) ................ 7 III. PROJECT ELEMENT 3 – FORCED AIR VENTILATION ................................................... 7 IV. PROJECT ELEMENT 4 – WATER JETTING – PIPE CLEANING....................................... 7 V. PROJECT ELEMENT 5 – DEWATERING AND BY-PASS PUMPING ................................. 7 VI. PROJECT ELEMENT 6 – DEBRIS, GRIT, AND RAG REMOVAL ...................................... 7 VII. PROJECT ELEMENT 7 – CLOSED CIRCUIT TELEVISION (CCTV) SURVEYS .................. 8 VIII. PROJECT ELEMENT 8 – REPAIR OF PIPELINE LINER AND COATING SYSTEMS ............. 8 IX. PROJECT ELEMENT 9 – INCIDENTAL REPAIRS .......................................................... 8 X. PROJECT ELEMENT 10 – EXCAVATION AND SHORING ............................................... 9 XI. PROJECT ELEMENT 11 – CATHODIC PROTECTION INSTALLATION .............................. 9 IV. PROJECT MANAGEMENT ........................................................................................ 9 A. PROJECT SCHEDULE .................................................................................................... 9 B. PROJECT SUPPORTS .................................................................................................. 10 C. CONSTRUCTION AND INSTALLATION SERVICES ..................................................... 10 D. WORK HOURS/NOISE REQUIREMENTS ..................................................................... 10 V. SAFETY AND HEALTH REQUIREMENTS .............................................................. 10 A. INJURY AND ILLNESS PREVENTION PROGRAM ....................................................... 11 B. CONTRACTOR SAFETY ORIENTATION ...................................................................... 11 C. JOB SAFETY ANALYSIS (JSA) .................................................................................... 11 D. LOCKOUT TAGOUT (LOTO) ......................................................................................... 11 E. CONFINED SPACE ENTRY (CSE) AND RESCUE ........................................................ 11 F. FALL PROTECTION ...................................................................................................... 12 G. HOT WORK ................................................................................................................... 12 EXHIBIT A 2 of 13 Specification No. S-2026-720BD H. CHEMICAL SAFETY ...................................................................................................... 12 I. TRAINING RECORDS ................................................................................................... 12 VI. TRAFFIC CONTROL ................................................................................................ 12 VII. SPILL REPORTING AND HANDLING ................................................................ 13 VIII. RESEALING MANHOLE AND VAULT COVERS ............................................... 13 IX. FOCUS MEETINGS AND DRY RUNS ...................................................................... 13 X. MANAGEMENT OF SUBCONTRACTORS AND SUB-CONSULTANTS ................. 13 XI. REQUEST FOR CORROSION ASSESSMENT SUPPORT ...................................... 13 I. ORGANIZATIONAL INFORMATION Orange County Sanitation District (OC San) is a governmental agency responsible for wastewater treatment for metropolitan Orange County, California. It has been in existence since 1954 and is the third-largest wastewater treatment agency west of the Mississippi River. OC San’s Plant 1 is located at 10844 Ellis Avenue, Fountain Valley, and Plant 2 is located at 22212 Brookhurst Street, Huntington Beach. II. SUMMARY This scope of work is for on-call Contractor support services for assessments and incidental repairs of OC San’s assets, including plant pipelines, sewers, manholes, wet wells, tunnels, and other structures to be determined by OC San staff. The Contractor shall provide all personnel and equipment as needed to support OC San staff in their assessment and incidental repairs of OC San assets, including performing ancillary tasks such as cleaning and debris removal to perform the assessments and to carry out incidental repairs as directed by OC San staff. Required services include, but are not limited to the following: • Confined space entry support, including provision of personnel and of all associated essential equipment for safe entry/exit, rescue personnel and equipment, preparation of safety plans in accordance with OC San requirements, focus meetings, shutdown dry runs, and coordinating lockout tagout (LOTO) procedures. As these entries include live sewers or exposure to potentially Immediately Dangerous to Life and Health (IDLH) environments, Contractor and Subcontractor will be required to provide and use Self- Contained Breathing Apparatus (SCBA) or Supplied Air Respirators (SAR), equipped with emergency escape bottles. Rescue personnel and support equipment shall be provided for all confined space entries, and all rescue teams shall be certified to comply with California Occupational Safety and Health Administration (OSHA) requirements. • Forced-air ventilation • Water jetting • Dewatering or by-pass pumping • Debris, grit, and rag removal prior to assessments • Incidental repairs • Closed Circuit TV (CCTV) support and CCTV production • Rebar Locating • Concrete core samples collection and Testing • Concrete repairs after core sample removal • Cathodic Protection Installation • Ground Penetrating Radar • Repairs to existing T-Lock® Arrow-Lock® or other types of liners and coatings, and other incidental repairs as directed by OC San. EXHIBIT A 4 of 13 Specification No. S-2026-720BD • Traffic control to facilitate assessments. The Contractor shall at all times provide services to ensure compliance with all applicable regulatory requirements and OC San’s standards. The Contractor shall contract with qualified and approved specialist consultants for the provision of specific services to include concrete core analysis, structural engineering evaluation, Non-Destructive Evaluation (NDE), and cathodic protection system surveys as needed to augment the directly provided services. III. BACKGROUND, PROJECT DESCRIPTION, AND PROJECT ELEMENTS A. BACKGROUND In other industries, corrosion engineering and corrosion control design, as it relates to pipelines, process piping, and storage and treatment facilities, have experienced different levels of implementation depending on the risk of failure and consequence of failure. Hazardous materials such as fuel oil and natural gas have a mandate from the United States Department of Transportation (DOT), as implemented by the California Public Utilities Commission (CPUC), calling for corrosion monitoring and assessment on a regular basis. As a result, these industries have proactive corrosion control programs and in-house corrosion departments. Corrosion engineering in the water and wastewater industries varies by municipality. Generally, economic and environmental factors have been the motivation for corrosion control, ranging from fix it as it leaks (reactive) to proactive programs of inspection/assessment followed by coatings, linings, and external cathodic protection. In the 1980s, East Bay Municipal Utility District demonstrated that investment into a proactive corrosion control and monitoring program resulted in savings of $15 to every $1 allocated to corrosion control. OC San has constructed several new facilities for expansion since the first facilities began operation in 1954. Excavating facilities for repair or replacement due to corrosion requires an enormous effort and high cost. Regulations have been changing infrastructure management. In response to these factors, OC San has elected to support a proactive maintenance program. One (1) element of this proactive approach is to conduct internal assessments of piping and associated facilities to determine their current condition and use this information to make recommendations for their future maintenance and operation. B. GENERAL PROJECT DESCRIPTION The purpose of this contract is to provide OC San with on-call contractor support services so that OC San can carry out assessments of selected facilities, structures, pipelines, and other assets to evaluate their current condition. In addition, perform maintenance repairs as directed by OC San. The shutdowns, flow diversions, assessments, and all other tasks will be scheduled by OC San personnel. The level of Contractor support will vary for each structure or asset to be assessed, depending upon the specific facility and the planned level of EXHIBIT A 5 of 13 Specification No. S-2026-720BD assessment that is either desired or is practical. In all instances, the assessments will be directed by OC San personnel and not by the Contractor. The Contractor shall provide the required support for each assessment task as determined on a case-by-case basis. All subcontractors shall be approved by OC San prior to performing any services under this contract. The level of contractor support for incidental repairs will be dependent upon the specific task. In all instances, the repairs will be directed by OC San personnel and not by the Contractor. For each task, OC San will prepare a “Request for Assessment Support/Incidental Repairs” that includes a scope of work, schedule, work duration, and a not-to-exceed amount for the services to be provided by the Contractor. Upon OC San’s request, the Contractor shall provide input into or prepare a work plan or means and methods plan to optimize the assessment/incidental repair process. This may involve preliminary meetings and job walks with OC San staff to finalize the support requirements to perform the required corrosion assessments. The Contractor shall provide the following services: • Confined space entry support for permit-required confined spaces, including but not limited to provision of SCBA/SAR equipment, rescue equipment (e.g., davits, winches, harnesses, tripods, SRLs), rescue team, ventilation equipment, communication equipment, and atmospheric monitoring equipment. • Provision of 3,000 psi water-jetting equipment with up to 300 feet of associated hoses and trained operators to adequately water jet as needed before CCTV inspection and physical assessment by OC San. • Provision of submersible or grade-mounted pumps of appropriate rating and capacity to dewater the identified structures for internal Corrosion assessment by OC San. This will include installation and removal of all required bypass piping and associated fittings. • Debris and rag removal using vacuum excavation equipment, like a Vactor truck or other approved equipment, prior to physical or CCTV assessments. • Provision of CCTV services and required support in compliance with OC San standards. • Provision of a trailer-mounted welding machine. • Provision of as-needed incidental repairs. • Provision of concrete rebar locating, core drilling equipment, and drill bits for core sampling. • Cathodic Protection Installation • Repair of existing Ameron T-Lock® liner or other lining and coatings by qualified and experienced personnel. EXHIBIT A 6 of 13 Specification No. S-2026-720BD The Contractor’s staff must be able to communicate in English both orally and in writing with OC San staff as well as with other members of their crew. The Contractor’s staff shall demonstrate the capability to read, interpret, and understand the Safety/OSHA requirements, OC San’s plans, drawings, and specifications, as necessary. All work and equipment utilized shall conform to Cal OSHA Title 8 requirements, including, but not limited to, work performed in confined spaces and/or gas-hazardous environments. C. REQUEST FOR CORROSION ASSESSMENT SUPPORT For each new assessment support task, OC San will prepare and issue a “Request for Assessment Support/Incidental Repair” to the Contractor. Each Task Order for assessments shall not exceed $250,000, and each task order for incidental repairs shall not exceed $99,999. D. PROJECT ELEMENTS The Project will be divided into Project Elements with each having their own unit rates (see Exhibit B). For any given assessment, the Contractor will be required to supply all manpower and equipment to provide for a combination of Project Elements as determined by OC San to meet the needs of the individual assessments. i. PROJECT ELEMENT 1 – CONFINED SPACE ENTRY SUPPORT WITH SCBA, SUPPLIED AIR, OR DRAGER BG-4 RE-BREATHER APPARATUS • Confined space entry support for permit-required confined spaces, including but not limited to provision of SCBA/SAR equipment, rescue equipment (e.g., davits, winches, harnesses, tripods, SRLs), rescue team, ventilation equipment, communication equipment, and atmospheric monitoring equipment. Contractor personnel shall be trained in confined space entry and rescue, including confined space entry supervisor, entrant, attendant, and rescuer. The Contractor shall prepare all safety plans, confined space entry procedures, rescue plans, and coordinate LOTO with OC San staff for each assessment. The Contractor's rescue team shall be provided for all confined space entries. The rescue team shall be trained and certified in accordance with the Cal/OSHA requirements. All entry support staff shall be trained, experienced, and certified in the use and operation of SCBA, SAR, fall protection, ventilation, and atmospheric monitoring equipment. All entry support staff shall be trained and experienced in providing communications systems for entrants in often long-line live sewers where line-of-sight communications are not possible. Experience to include the use of bone mike-radio systems, hard-wire communications, air horns, and other technologies or means to provide adequate communications during assessments. Forced-air ventilation equipment, including fans, venturis, ducting, and portable generators as needed to permit, where practical, non- SCBA entry for the OC San assessment engineers and Contractor’s support crews. EXHIBIT A 7 of 13 Specification No. S-2026-720BD ii. PROJECT ELEMENT 2 – CONFINED SPACE ENTRY SUPPORT (NON SCBA) Confined space entry and support for OC San staff entry to include confined space entry supervisor, attendant, entrant, rescue personnel, entry and exit equipment, monitoring equipment and all standard safety equipment (including but not limited to all PPE, tripods, winches, harnesses, fall restraint lanyards and ropes), Self-Contained-Self-Rescue (SCSR) Re- breathers (Ocenco EBA 6.5) and communications systems to perform the required assessments. The Contractor’s entry supervisor shall prepare the required safety plans with OC San Safety staff and coordinate LOTO with OC San personnel for each assessment. iii. PROJECT ELEMENT 3 – FORCED AIR VENTILATION Provision of forced-air ventilation equipment, including fans, venturis, ducting, electrical cords, and portable generators with Ground Fault Circuit interrupters (GFCIs) as needed to permit entry into the assets for OC San and Contractor’s staff. Contractor shall provide suitably rated ventilation fans, associated equipment, and support personnel from local subcontractors as required and as directed by the OC San Project Engineer. iv. PROJECT ELEMENT 4 – WATER JETTING – PIPE CLEANING The Contractor shall provide water jetting equipment rated at 3,000 PSI, with a minimum of 300 feet of associated hoses and trained operators to adequately clean surfaces prior to inspection and physical assessment by OC San staff. All water, power generation, and removal of jet water with contained debris to be performed by the Contractor. All extracted material shall be disposed of at OC San’s Plant No. 1. Contractor shall provide or subcontract higher-pressure water jetting equipment if required by OC San staff and invoiced per Exhibit B. v. PROJECT ELEMENT 5 – DEWATERING AND BY-PASS PUMPING Where required, the Contractor is to provide suitably sized and rated pumps with all ancillary power supply, piping, and fittings to dewater an identified structure or pipe section or to bypass an asset to facilitate entry for physical or CCTV assessment. The Contractor shall work closely with OC San staff to optimize all dewatering and bypass piping operations to utilize available equipment and to meet OC San’s operational requirements. The pump selection and piping requirements will vary significantly between tasks. The Contractor shall provide a two-inch, submersible pump complete with 200 feet of associated hoses and AC power generation (with GFCIs) as part of the standard equipment on their ‘Combo” trucks. Contractor shall also provide three-inch, four-inch, and six-inch pumps as directed by OC San staff. Larger pumps (and associated equipment) shall be rented from specialist vendors as directed by OC San staff. vi. PROJECT ELEMENT 6 – DEBRIS, GRIT, AND RAG REMOVAL Provide extraction or removal services for debris, grit, and rags from assets prior to assessment or CCTV inspection using vacuum excavators (e.g., Vactor Truck) or other approved equipment. The Contractor shall provide all labor and equipment to remove debris, grit, and rags that would impede or EXHIBIT A 8 of 13 Specification No. S-2026-720BD prevent the required assessment. All extracted material shall be disposed of within OC San’s Plant No. 1 or as directed by OC San staff. Where special circumstances are encountered, such as very high volumes, in excess of two feet deep of debris and rags within a structure, the Contractor shall work with OC San to develop a location-specific plan for the debris removal process and for specialist subcontract services to be provided. vii. PROJECT ELEMENT 7 – CLOSED CIRCUIT TELEVISION (CCTV) SURVEYS Provision of CCTV inspection services shall be in compliance with OC San standards. Contractor shall furnish all labor, materials, equipment, and incidentals necessary for the video inspection of various lengths and sizes of sanitary sewers located in the treatment plants and throughout Orange County. Sewers will be cleaned sufficiently by the Contractor for the camera to pass through the pipe. All CCTV operators shall be National Association of Sewer Service Companies (NASSCO) certified. A color video recording on a USB Drive will be made of the inspection and submitted to OC San's representative(s), along with the required Inspection Report. The Inspection Report will include a description, pictures, and the location of the defects. viii. PROJECT ELEMENT 8 – REPAIR OF PIPELINE LINER AND COATING SYSTEMS Repair of the Ameron T-Lock® pipeline liner or other liner materials shall be performed by experienced personnel. All repairs to T-Lock® liners shall be in full compliance with OC San master specification section 06620 - Plastic Liner (Polyvinyl Chloride) and 09800 – Protective Coating. Repairs to all other pipeline liners and coating systems shall be in compliance with OC San’s master specifications and procedures. The OC San master specifications are available upon request at OC San’s Plant No.1. This scope of work includes the provision of all T-Lock® or Arrow-Lock® repair materials or other pipe-liner and coating repair materials and equipment as needed. All confined space entry support for the liner repairs shall be as indicated for Project Elements 1 or 2 above, as applicable. ix. PROJECT ELEMENT 9 – INCIDENTAL REPAIRS Perform incidental repairs to OC San assets during the course of condition assessments. Incidental repairs may be performed on components that have failed or are likely to fail within the next 2 to 5 years, and such failure could cause a disruption to the level of service, or the asset will experience a significant loss of structural integrity. Incidental repairs may be warranted during the condition assessment to avoid duplication of setup and difficult or high-risk operational conditions. The cost of the incidental repairs performed during a condition assessment task shall not exceed $99,999. The Contractor shall keep a running total of all billings and expenses so that the cost of the incidental repairs for an individual task does not surpass the not to exceed amount. OC San will not exceed this figure. The repairs may include, but not be limited to, abrasive blasting/ultra-high pressure water blasting; coating and lining application and repair; concrete crack injection; repair of concrete and steel structures; replacement of wear EXHIBIT A 9 of 13 Specification No. S-2026-720BD items; mechanical repairs; machining; replacement of valves, repairs to gates, piping, and drains; and welding. x. PROJECT ELEMENT 10 – EXCAVATION AND SHORING Perform excavation for any underground assets external assessment as directed by OC San. Any excavation shall be performed as per OC San master specification 02200- Earth work, and provide shoring, if applicable, as per OC San master specification 02210 – Excavation Support and Protection. After assessment and incidental repairs are completed, the Contractor shall backfill the excavated site as per OC San's applicable master specifications and as directed by OC San. xi. PROJECT ELEMENT 11 – CATHODIC PROTECTION INSTALLATION The Contractor shall perform Cathodic Protection (CP) installation on OC San assets during the course of this contract. CP installation may include CP test station, Sacrificial Anodes, Impressed Current Anodes, Permanent Reference cells, Cables, Cable to Pipe (metal) connections using thermit welding and pin brazing method, Transformer and Rectifier (TR) installation as directed by OC San. All CP installations shall be performed under the supervision of NACE/AMPP-certified personnel. All CP installations shall be as per OC San master specification 13110- Corrosion Control and other applicable master specifications and OC San CP standard drawings. The cathodic protection installation may include testing and commissioning of the cathodic protection installation by NACE/AMPP-certified personnel. IV. PROJECT MANAGEMENT The assessment project shall be managed by OC San staff. However, the Contractor shall manage all support tasks, including equipment supply, provision of manpower, and other directly supplied or subcontracted services as detailed, and shall keep OC San apprised of the status of the support effort for each instance. The Contractor shall provide the key management and supervisory personnel as described in their proposal on this contract. The Contractor shall not reassign the key project personnel without prior approval of OC San. OC San may request re- assignment of any of the Contractor’s (or subcontractor’s) personnel. The Contractor shall be responsible for the supervision and management of all subcontractors. A. SCHEDULING AND WORK HOURS Because the on-call Contractor support is for assessments and incidental repairs, a detailed project schedule is not applicable. However, the Contractor shall provide the anticipated levels of support as indicated in Project Elements I through 11 inclusive over the entire contract period. OC San staff will coordinate the planned shutdowns, assessments, and incidental repairs with the Contractor and with OC San operations to ensure that all required resources are available for each task. For each task, OC San will prepare and issue to the Contractor a “Request for Assessment Support/Incidental Repair” that includes a scope of work, EXHIBIT A 10 of 13 Specification No. S-2026-720BD schedule, work duration, and a not-to-exceed amount for the services to be provided. The Contractor shall respond to OC San task requests within two (2) calendar days. Delays in responses may be cause for cancellation of the contract. This contract may require the Contractor to work schedules outside of the normal OC San business hours. Normal business hours are considered 7:00 a.m. to 4:30 pm. Night work is common, and weekend hours may also be necessary due to low flow conditions during these periods. Emergency assessment support: In the case of an emergency, the Contractor shall provide assessment/incidental repairs support within four (4) hours of notice from OC San. B. PROJECT SUPPORTS All OC San Assessment/Incidental repairs projects are divided into six (6) phases. Contractor shall provide support services for Project Elements for the following Phases: Phase 1 – Pre-Assessment Planning Phase 2 – Pre-Assessment Support to OC San O &M Team Phase 3 – Assessment Phase 4 – Incidental Repairs Phase 5 – Post Assessment Support to OC San O & M Team Phase 6 – Assessment Findings Documentation C. CONSTRUCTION AND INSTALLATION SERVICES Construction and installation services shall be provided by the Contractor on an “as needed” basis to support the corrosion assessments by OC San and perform incidental repairs over the duration of this contract. D. NOISE REQUIREMENTS When working outside of the property limits of OC San Plant 1 or Plant 2, specific work hours and nighttime schedules may be imposed by the California Department of Transportation (CALTRANS), local cities, the County of Orange, or whoever has jurisdiction. The Contractor is required to work within those hours of operation and to provide necessary equipment to meet local noise restrictions that may be imposed. V. SAFETY AND HEALTH REQUIREMENTS The Contractor and any subcontractors shall comply with all applicable provisions of the OC San Safety Standards, Federal OSHA, California OSHA, and local regulations, whichever is most stringent. EXHIBIT A 11 of 13 Specification No. S-2026-720BD A. INJURY AND ILLNESS PREVENTION PROGRAM The Contractor shall prepare and submit a written Injury and Illness Prevention Program (IIPP). The IIPP must address responsibility, compliance, communication, hazard assessment, incident investigation, hazard correction, and training as required by Title 8, California Code of Regulations, Section 3203. The Contractor shall also prepare and submit safety programs where required by Cal OSHA. These programs may include fall protection, lockout tagout, confined space entry, and hazard communication. The safety plan must be specific to the work being completed and approved prior to the start of work (including mobilization). B. CONTRACTOR SAFETY ORIENTATION The Contractor shall attend a Contractor Safety Orientation (CSO) meeting prior to the start of work. The CSO is an OC San safety orientation conducted between OC San’s Risk Management Division (safety and health) and the Contractor. The CSO is conducted once per year or when job conditions or the scope of work change. The Contractor shall participate in these meetings by providing work plans and other requested safety deliverables described below. C. JOB SAFETY ANALYSIS (JSA) The Contractor shall prepare Job Safety Analyses for work tasks completed by the Contractor. The JSA is a procedure where each basic step of the work task has identified hazards and recommended controls for the safest way to complete the work task. D. LOCKOUT TAGOUT (LOTO) The Contractor shall participate in the OC San LOTO process. OC San will isolate the structure and associated systems prior to Contractor entry into the structure. OC San will prepare a written energy control procedure for the structure. OC San will demonstrate that hazardous energy has been controlled by walking each isolation point and reviewing the energy control procedure with the Contractor. The Contractor shall apply their own lock and tag to the OC San lock box upon acceptance and sign the energy control procedure. Each Contractor and subcontractor employee working in the structure must apply their own lock and tag. E. CONFINED SPACE ENTRY (CSE) AND RESCUE The Contractor shall assume the work area will be in an area classified as a PRCS. The Contractor shall prepare a PRCS Entry Permit, Entry Procedure, and Rescue Plan that describes all procedures, equipment, and methods proposed to be used. A dedicated Rescue Team is required. Calling 911 or relying on the local fire department for rescue is not acceptable. A ventilation plan is required to be developed by qualified personnel and implemented during any entry into the structure. The Contractor shall monitor the atmosphere during entry for oxygen, carbon monoxide, flammable gases, and hydrogen sulfide. The Contractor should not assume that any OC San owned EXHIBIT A 12 of 13 Specification No. S-2026-720BD equipment is available for Contractor use. All safety support shall be provided for OC San Inspectors or Engineers at the Contractor’s expense. The Contractor shall assume all work areas are classified as a Permit-Required Confined Space (PRCS). The Contractor is required to have a copy of its current confined space entry permit at every job site at all times. The OC San inspector or Engineer may shut down the job site at no additional cost to OC San if the permit is not available upon request. While isolation is provided, the Contractor should assume there will be a potential exposure to wastewater. OC San Risk Management will review the submitted Entry Permit, Entry Procedures, Rescue Plan, and Ventilation Plan. If accepted, OC San Risk Management will issue the Contractor a Confined Space JHA authorizing the Contractor for such entry. F. FALL PROTECTION Fall protection shall be provided around all openings to protect Contractor employees and OC San. Fall protection at openings shall consist of a portable guardrail or other suitable barrier to prevent persons from falling to a lower level. Fall protection will be required for personnel when using Contractor provided extension ladders when accessing the structures. Fall protection will be required when working at heights greater than four feet. If scaffolding is required, the scaffolding system shall be designed by a scaffold qualified person and erected, inspected, and dismantled by a scaffold competent person. The scaffolding shall be supplied by a qualified, experienced scaffolding company. Contractor shall submit scaffold plans prior to use and must be approved by OC San. G. HOT WORK Any activity producing spark, flame, or heat will require an OC San issued hot work permit. The Contractor, depending on the activity, will be required to provide appropriate controls in accordance with OC San’s hot work program. These controls may include a fire watch, a 20-pound fire extinguisher, fire blankets, and an atmospheric monitor. H. CHEMICAL SAFETY All chemicals brought onsite shall be accompanied by a safety data sheet (SDS). The Contractor must store and use those chemicals in accordance with the SDS and manufacturer's instructions. I. TRAINING RECORDS Contractor shall submit copies of its employee training records to Risk Management for retention. VI. TRAFFIC CONTROL All traffic control on public rights of way shall be in accordance with the latest CALTRANS Manual of Traffic Control. Additional local regulations shall have precedence. Safe and adequate pedestrian and vehicular access shall be provided in accordance with the latest Standard Specifications for Public Works EXHIBIT A 13 of 13 Specification No. S-2026-720BD Construction. For work within OC San facilities, traffic control requirements as determined by OC San shall apply. Contractor shall prepare or purchase traffic control plans, apply for all traffic control permits, and pay all fees and permits for said permits as directed by OC San staff, and shall invoice per the attached Cost Proposal Form. Note: Inadequate or improper signing and delineation for traffic control may be cause for the cancellation of the contract. VII. SPILL REPORTING AND HANDLING In the event of any Contractor-related overflow or interruption/ backup of customer service, the Contractor shall immediately notify the OC San Control Center at Plant No. 1 via phone at (714) 593-7025, and shall contain and eliminate the overflow. Workshops with the contractor’s staff may be provided by OC San regarding containment methods. Contractor shall be responsible for any fines levied by others, reimbursement of any agency incurred costs, damage, cleanup, restoration of flow, and any disruption of service costs to customers as a result of the Contractor’s work. This is in addition to any costs incurred by customers. Contractor shall also notify the OC San Control Center immediately of any apparent non-Contractor-related spills and/or any abnormal conditions. VIII. RESEALING MANHOLE and VAULT COVERS Contractor shall reseal all manholes and vaults opened during the course of the contract that were previously sealed with Calpico #CD-5 duct seal or equal, within 24 hours after work is completed or as directed by OC San staff. Work area around the manhole covers shall be swept clean of all debris after completion of all work at that location. IX. FOCUS MEETINGS AND DRY RUNS The Contractor shall prepare for and oversee a focus meeting and a dry run prior to each shutdown and corrosion assessment/incidental repair as directed by OC San staff. The focus meetings and dry runs will serve to share information, discuss technical issues, understand time constraints, receive and resolve comments, obtain decisions, and receive direction from OC San. These actions shall insure that potential problems can be anticipated and either avoided or minimized. In addition, these activities will identify any specific equipment or spare parts required on site prior to the shutdown and subsequent work, so that delays are minimized or avoided. X. MANAGEMENT OF SUBCONTRACTORS and SUB-CONSULTANTS The Contractor shall be responsible for and shall manage the activities of all subcontractors and subconsultants utilized under this scope of work. OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5012 Agenda Date:7/22/2026 Agenda Item No:8. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: REDHILL RELIEF SEWER RELOCATION AT STATE ROUTE 55, PROJECT NO. FE18-13 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve the Second Amendment to Utility Agreement No.OCSD-1005,between the Orange County Sanitation District and the Orange County Transportation Authority,for final reimbursement amount of $4,996,443 for Project No.FE18-13,Redhill Relief Sewer Relocation at State Route 55,in the City of Santa Ana. BACKGROUND The Orange County Transportation Authority (OCTA)is currently widening State Route 55 (SR-55) between Interstate 5 and Interstate 405.The Orange County Sanitation District (OC San)owns a sewer crossing beneath SR-55 immediately south of Warner Avenue in the City of Santa Ana. OC San executed Project No.FE18-13,Redhill Relief Sewer Relocation at State Route 55,to extend the required protective casing for the sewer and relocated a manhole out of the widened right of way. OCTA first agreed to reimburse OC San for the cost of this work in a March 2020 Utility Agreement between the agencies. RELEVANT STANDARDS ·Maintain collaborative and cooperative relationships with regulators,stakeholders,and neighboring communities ·Protect OC San assets PROBLEM In November 2022,OCTA paused the mobilization of OC San’s contractor due to Southern California Edison’s (SCE’s)design and construction procurement delays to relocate their interfering electrical utility line.SCE completed their construction,allowing OC San’s contractor to mobilize after July 2024.A few days after mobilizing in October 2024,OC San’s contractor discovered two utilities that were in direct conflict with the new sewer alignment.One was a Caltrans electrical line that was relocated quickly upon discovery and the second consisted of a Verizon fiber communication cable that had to be relocated.Both were not anticipated to be in conflict based on existing utility Orange County Sanitation District Printed on 7/13/2026Page 1 of 3 powered by Legistar™ File #:2026-5012 Agenda Date:7/22/2026 Agenda Item No:8. that had to be relocated.Both were not anticipated to be in conflict based on existing utility information. OCTA agreed to reimburse OC San for associated costs. PROPOSED SOLUTION Approve the Second and Final Amendment to the Utility Agreement increasing the Utility Agreement’s reimbursable from $2,840,000 to $4,996,443. OCTA has accepted the final upper limit. TIMING CONCERNS OC San needs to revise the Utility Agreement with OCTA in order to be compensated for the additional costs. RAMIFICATIONS OF NOT TAKING ACTION OC San will not be reimbursed for the additional costs. PRIOR COMMITTEE/BOARD ACTIONS March 2025 -Approved a construction contingency increase of $531,120 (24%)to the existing Construction Contract with SRK Engineering,Inc.for Redhill Relief Sewer Relocation at State Route 55,Project No.FE18 13,for a total contract amount not to exceed $2,213,000 and a new total construction contingency of $1,327,800 (60%),with all costs to be reimbursed by the Orange County Transportation Authority. July 2024 -Approved a construction contingency increase of $464,730 (21%)to the existing construction contract with SRK Engineering,Inc.for Redhill Relief Sewer Relocation at State Route 55,Project FE18-13,for a total contract amount not to exceed $2,213,000 and a total construction contingency of $796,680 (36%),with all costs to be reimbursed by the Orange County Transportation Authority. June 2022 -Received and filed Bid Tabulation and Recommendation for Redhill Relief Sewer Relocation at State Route 55,Project No.FE18-13;awarded a Construction Contract to SRK Engineering,Inc.for Redhill Relief Sewer Relocation at State Route 55,Project No.FE18-13 for an amount not to exceed $2,213,000; and approved a contingency of $331,950 (15%). September 2021 -Approved the First Amendment to Utility Agreement No.OCSD-1005,between the Orange County Sanitation District and the Orange County Transportation Authority agreeing to a funding increase for the relocation and protection of the Redhill Relief Sewer at State Route 55 in the City of Santa Ana. March 2020 -Approved Utility Agreement No.OCSD-1005 between the Orange County Sanitation District and the Orange County Transportation Authority agreeing to specific terms,conditions,and funding obligations regarding the relocation and protection of the Redhill Relief Sewer at State Route 55 in the City of Santa Ana. Orange County Sanitation District Printed on 7/13/2026Page 2 of 3 powered by Legistar™ File #:2026-5012 Agenda Date:7/22/2026 Agenda Item No:8. ADDITIONAL INFORMATION Utility Agreement No.OCSD-1005 cites Section 703 of the Streets and Highways Code declaring OC San’s Redhill Relief Sewer Relocation at State Route 55 project qualifies for full reimbursement at OCTA’s expense.The agreement obligates OC San to submit a final bill to OCTA within 360 days of the completion of the relocation for the remaining balance of OC San’s relocation costs. CEQA The Caltrans/OCTA SR-55 Improvement Project includes the relocation and protection of the Redhill Relief Sewer in their Initial Study/Mitigated Negative Declaration/Environmental Assessment. Unrelated to the Caltrans/OCTA Improvement Project is an OC San repair project,which is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations section 15301.A Notice of Exemption was filed in June 2022 with the OC Clerk-Recorder after the OC San's Board of Directors approval of the Construction Contract. FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget Update FY 2025-26,Page A-8,Small Construction Projects Program,Project No. M-FE) and the budget is sufficient for the recommended action. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Second Amendment to Utility Agreement No. OCSD-1005 ·First Amendment to Utility Agreement No. OCSD-1005 ·Utility Agreement No. OCSD-1005 RD:lb Orange County Sanitation District Printed on 7/13/2026Page 3 of 3 powered by Legistar™ ORANGE COUNTY TRANSPORTATION AUTHORITY Page 1 of 2 SECOND AMENDMENT TO UTILITY AGREEMENT NO. OCSD-1005 13-EX-24 (REV 1/2014) District County Route Post Mile Project ID No. EA 0J340 12 Orange SR-55 6.4 / 10.2 1200020328 STPLN-6071 (129) Federal Aid No.: Plan #-OCSD-1005 Owner’s File No.: FEDERAL PARTICIPATION: On the Project ☒ Yes ☐ No On the Utilities ☒ Yes ☐ No SECOND AMENDMENT TO UTILITY AGREEMENT NO. OCSD-1005 WHEREAS, the Orange County Transportation Authority, hereinafter called OCTA, and Orange County Sanitation District, hereinafter called OWNER, have entered into that certain Utility Agreement No. OCSD-1005, dated April 7, 2020, and a First Amendment on November 10, 2021, which Agreement sets forth the terms and conditions pursuant to which OWNER has performed relocation of its facilities to accommodate OCTA’s construction project on Route 55, Project No. 1200020328/EA 0J340; and, WHEREAS, in the performance of said work, increased costs over and above those estimated at the time of the execution of said Agreement were incurred due to the fact that: a) additional permitting costs due to Caltrans and City requested revisions; b) increased design and construction support costs as a result of unrecorded utility conflicts encountered during construction; c) change orders for Southern California Edison and Verizon delays; d) additional costs for a Verizon relocation in conflict with OWNER’s alignment; e) increased labor, construction, and material costs due to the COVID-19 pandemic; and f) an extended construction timeline as a result of the above-mentioned delays; and, WHEREAS, it has been determined that, since costs have overrun the amount shown in said Agreement by 248.18% ($3,561,443 increase), and when the increased cost exceeds by 25% the estimated amount set forth in said Agreement, said Agreement shall be amended to show the increased cost of the work to OCTA; and, WHEREAS, the estimated cost to OCTA of the work to be performed under said Agreement was $1,435,000.00, and by reason of the increased costs referred to above, the amended estimated cost to OCTA is $4,996,443.00. NOW, THEREFORE, it is agreed between the parties as follows: 1. The estimated cost to OCTA of $1,435,000.00 as set forth in the Agreement is hereby amended to read $4,996,443.00. 2. All other terms and conditions of said Agreement remain unchanged. SECOND AMENDMENT TO UTILITY AGREEMENT NO. OCSD-1005 (Cont.) Page 2 of 2 IN WITNESS WHEREOF, the parties hereto have executed this Second Amendment to Utility Agreement No. OCSD-1005 this day of , 2026. OWNER: ORANGE COUNTY SANITATION DISTRICT ORANGE COUNTY TRANSPORTATION AUTHORITY, a public entity APPROVED APPROVED By: By: Date: Date: James G. Beil, P.E. Executive Director, Capital Programs APPROVED AS TO FORM: Alston & Bird, LLP APPROVED AS TO FORM: By: By: James M. Donich General Counsel ATTEST: Date: Kelly A. Lore, MMC Clerk of the Board ___________________________________ Scott C. SmithGeneral Counsel Christine Marick Board Vice-Chairwoman ORANGE COUNTY TRANSPORTATION AUTHORITY FIRST AMENDMENT TO UTILITY AGREEMENT NO.OCSD-1005 Page 1of2 13-EX-24 (REV 1/2014) District Countv Route Post Mile Proiect ID No.EA 12 Orange SR-55 6.4/10.2 1200020328 0J340 Federal Aid No.:STPLN-6071 (129) Owner's File:Plan #-0CSD-1005 FEDERAL PARTICIPATION:On the Project M Yes No On the Utilities S Yes No FIRST AMENDMENT TO UTILITY AGREEMENT NO.OCSD-1005 WHEREAS,Orange County Transportation Authority,hereinafter called OCTA,whose address is 550 South IVIain Street,Orange,California 92863-1584,and Orange County Sanitation District,hereinafter called OWNER,have entered into that certain Utility Agreement No.OCSD-1005,dated April 7,2020,which Agreement sets forth the terms and conditions pursuant towhich OWNER has been performing final design and relocation workto accommodate SR-55 Improvement Project No.1200020328/EA 0J340; and, WHEREAS,in the performance of said work,increased costs of $1,405,000.00 over and above those estimated at the timeof the execution of said Agreement were incurred due to revisions made to the original, conceptual sewerdesign along with theadditional associated design work andconstruction costs in connection therewith;and, WHEREAS,it has been determined that,since costs have overrun the amount shown in said Agreement by 97.91 %,and when the increased cost exceeds by25%the estimated amountset forth in said Agreement,said Agreement shallbe amended to show the increased cost ofthe work to OCTA;and, WHEREAS,the estimated cost to OCTA of the work to be performed under said Agreement was $1,435,000.00,and by reason ofthe increased costs referred toabove,the amendedestimated cost to OCTA is $2,840,000.00. NOW,THEREFORE, the PARTIESagree to amend the AGREEMENTas follows: 1.The estimated cost to OCTA of $1,435,000.00 as set forth in the AGREEMENTis hereby amended to read $2,840,000.00. 2. Allother terms and conditions of the AGREEMENT remain unchanged. LEGAL02/4095070lv3 ORANGE COUNTY TRANSPORTATION AUTHORITY PagplofS UnLII-y AGKEBMENT RW 13^)5 (K1£V12/2016) UlSlKICI 12 COUNTY Orange ROUTE SR-55 POSTMILE 6,4/10.? Project ID 1200020328 EA 0J340. federalAID NUMBER STPLN-6071 (129) OWN ocs ER'S PLAN NUMBER D-1005 On the project IE!yes no On the Utilities IE!yes no UTILITY AGREEMENT NO.OCSD-1005 DATE Pursuant to Cooperative Agreement Number C-7-1936 (Cooperative Agreement),the Orange County Transportation Authority (OCTA)is partnering with the California Department of Transportation (Caltrans) in a project that proposes to widen State Route 55 (SR-55)between Interstate 405 and Interstate 5 (SR-55 ImprovementProject).Per the Cooperative Agreement,OCTA Is the lead agency for Right of Way Acquisition and UtiBty.The SR-55 ImprovementProject proposes to reduce traffic congestion,wnprove mobility as wellas trafficoperations to an existing four mile stretch of SR-55. Orange County Sanitation District (OCSD) 10844 BlisAvenue Fountain Valley, CA92708 Hereinafterrefierred to as "OWNER",owns and maintains sewer fiaciMes in the CityofSanta Anawithin the limits of OCTA'sprojectwhich requires project development,deagn,inspection, project management,relocation of a manhole and sewer segments and the extension of casing to accommodate OCTA's project,and provision of necessary easement interests as set forth in Section V below. It is hereby mutually agreed that I.WORKTO BE DONE In accordance with Notice to Owner No.OCSD-1005 dated February 13,2020,OWNER shall relocate sewer manhole and extend casing.All work shall be performed substantially m acconlance withOWNER'SPlan No.OCSI>-1005 dated February 13,2020consisting of 1 sheet, a copy of which is on file in the OCTA office at 550 S. Main Street;Orange,CA 92863-1584. Deviations from the OWNER'S plan described above initiated by either the OCTA or the OWNER, shall be agreed upon by both parties hereto under a Revised Notice to Owner.Such Revised Notices to Owner,approved by the OCTA and agreed to/acknowledged by the OWNER,will constitute an approved revision of tiie OWNER'S plan described above and are hereby made a part hereof.No work under said deviation shall commence prior to written execution by the OWNER of the Revised Notice to Owner.Changes in the scope of the work will require an amendment to tiiis Agreement in addition to the revised Notice to Owner. II.UABILITY FOR WORK ADA Noticc Pot individualswithsensorydisabilities,this documcnl is available inalternate formats. Por alternateformal information, contact the Forms Management Unit at (916)445-1233,TTY 711,or write to Records and Forms Management,1120 N Street,MS-89,Sacramento,CA 95814. UjCAI.02fl94927IIvI LnGAL02fl96l7270vl OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5013 Agenda Date:7/22/2026 Agenda Item No:9. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: SUPPLEMENTAL ENGINEERING SERVICES, CONTRACT NO. PSA2026-001 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve Professional Services Agreements to provide Supplemental Engineering Services, Contract No. PSA2026-001, for a three-year period with two one-year renewal options effective October 1, 2026, for a combined total amount not to exceed $55,800,000, initially allocated as follows: ·AECOM Technical Services, Inc. - $27,900,000 ·Jacobs Project Management Co. - $27,900,000; and B. Authorize the General Manager to transfer funds between the two Professional Services Agreements, as needed, to align contract budgets with actual workload distribution, with no increase to the total Board-authorized amount. BACKGROUND Orange County Sanitation District (OC San)delivers a Capital Improvement Program (CIP)and complex repair projects that require project management,project engineering,resident engineering, inspection, construction support, and specialized technical services. Since 2002,OC San has used Supplemental Engineering Services (SES)agreements to support CIP and small project delivery.Typical SES roles include project managers,project engineers,electrical engineers,resident engineers,and inspection staff.The largest need is for construction support roles,including resident engineers and inspectors.OC San also uses SES for specialty roles that are not maintained by staff, such as structural engineering and specialized rehabilitation work. In April 2022,the Board approved SES agreements with AECOM Technical Services,Inc.and Jacobs Project Management Co.,for a three-year period with two one-year renewal options.In December 2025,the Board authorized the General Manager to transfer funds between those agreements to balance contract budgets through April 2027 with no increase to the total Board- authorized amount. In 2025,OC San completed an Engineering Department Staffing Plan in response to the FY 2025-26 Orange County Sanitation District Printed on 7/13/2026Page 1 of 4 powered by Legistar™ File #:2026-5013 Agenda Date:7/22/2026 Agenda Item No:9. In 2025,OC San completed an Engineering Department Staffing Plan in response to the FY 2025-26 General Manager’s Work Plan goal to minimize SES,improve succession planning,and streamline the project delivery process.The plan shifts long-term support positions from supplemental contract staffing to OC San full-time positions over a four-year period through the normal budget process. During the transition period between October 1,2026 and April 30,2027 both SES contracts will be effective. The new contracts provide for new subconsultants. RELEVANT STANDARDS ·Comply with California Government Code Section 4526 to engage the best qualified firm “on the basis of demonstrated competence and qualifications”and “negotiate fair and reasonable fees” ·Ensure the public’s money is wisely spent ·Sustain 1, 5, and 20-year planning horizons PROBLEM OC San’s staffing requirements for the CIP workload exceed the Engineering Department’s current and future staff capacity.Although the Engineering Department Staffing Plan will reduce reliance on SES over time,OC San still needs supplemental resources to maintain project delivery,provide long- term construction support,address workload peaks,fill temporary vacancies,and provide specialty expertise not maintained by staff. OC San also needs flexibility to manage the distribution of work between the two selected firms. Assignment volume will vary based on project needs,staff availability,and each firm’s ability to provide qualified resources. PROPOSED SOLUTION Approve two Professional Services Agreements to provide Supplemental Engineering Services and authorize the General Manager to transfer funds between the agreements,as needed,without increasing the total Board-authorized amount. When OC San identifies a project or specialty support need,the two firms will be requested to propose qualified staff.OC San will select the most appropriate resource or team for each assignment and either authorize the staff to fill the staff role or negotiate the budget and schedule for the task. The General Manager’s authority to transfer funds between the two agreements will allow OC San to balance contract capacity based on actual utilization and the availability of qualified staff from each firm. This authority will not increase the total Board-authorized amount. Staff will continue to provide quarterly reports to the Board of Directors on the utilization of the SES contracts through Engineering’s Contracts Performance Report. Orange County Sanitation District Printed on 7/13/2026Page 2 of 4 powered by Legistar™ File #:2026-5013 Agenda Date:7/22/2026 Agenda Item No:9. TIMING CONCERNS Awarding these agreements in July 2026 will help to retain existing SES staffing as the existing agreements expire.Delaying approval could create resource gaps while new OC San positions are phased in and the CIP continues. RAMIFICATIONS OF NOT TAKING ACTION Without these supplemental engineering resources,OC San may need to delay projects or separately procure specialty services as needs arise,resulting in project delays and additional administrative costs. PRIOR COMMITTEE/BOARD ACTIONS N/A ADDITIONAL INFORMATION Consultant Selection: OC San advertised and requested proposals for Supplemental Engineering Services,Contract No. PSA2026-001,on January 28,2026.The following evaluation criteria were described in the Request for Proposals and used to determine the most qualified consultants. CRITERION WEIGHT Project Understanding and Approach 35% Related Project Experience 30% Project Team and Staff Qualifications 35% Three proposals were received on March 9,2026,and evaluated in accordance with the evaluation process set forth in OC San’s Purchasing Ordinance by a pre-selected Evaluation Committee consisting of OC San staff:three Engineering Managers.The Evaluation Committee also included one non-voting representative from the Contracts Administration Division. The Evaluation Committee scored the proposals on the established criteria as summarized in the table below: Firm Approach (Max 35) Related Experience (Max 30) Team (Max 35) Total Score (Max 100) 1 Jacobs Project Management Co. 34 29 32 95 2 AECOM Technical Services, Inc. 27 23 28 78 3 Hazen and Sawyer 25 20 25 70 Based on the proposal scoring,Jacobs Project Management Co.and AECOM Technical Services, Inc.,were ranked as the two most qualified firms.The Evaluation Committee determined interviews were not necessary and selected Jacobs Project Management Co.,and AECOM Technical Services, Orange County Sanitation District Printed on 7/13/2026Page 3 of 4 powered by Legistar™ File #:2026-5013 Agenda Date:7/22/2026 Agenda Item No:9. were not necessary and selected Jacobs Project Management Co.,and AECOM Technical Services, Inc., as the most qualified consultants. Jacobs Project Management Co.demonstrated qualified staff resources,familiarity with OC San’s project delivery needs,and leadership that supports continuity.AECOM Technical Services,Inc., demonstrated a structured approach,a deep bench of staff,experience providing supplemental staff to other public agencies,and dedicated field staff supervision.Together,the two firms provide qualified resources to support OC San’s ongoing project delivery needs. Review of Fee Proposal and Negotiations: Proposals were accompanied by sealed fee proposals.In accordance with OC San’s Purchasing Ordinance,the fee proposals of only the two highest-ranked firms were opened after approval by the Director of Engineering of the Evaluation Committee’s recommendation. Staff negotiated final contract terms with Jacobs Project Management Co.,and AECOM Technical Services,Inc.,including fringe and overhead rates and applicable contract terms.Based on the above,staff has determined that the final negotiated terms are fair and reasonable and recommends award of the Professional Services Agreements to Jacobs Project Management Co.and AECOM Technical Services, Inc. Contract Value: The agreements will provide services through task authorizations,task directives,and program role assignments.OC San will authorize specific work only as services are needed.The initial amount for each agreement is $27,900,000,with a not to exceed amount of $55,800,000.The General Manager may transfer funds between the agreements as needed,with no increase to the total Board- authorized amount. CEQA N/A FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2026-27 and FY 2027-28).Costs will be charged to approved project budgets.The authority to transfer funds between agreements will not increase the total Board- authorized amount. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Professional Services Agreements ·Presentation MD:lb Orange County Sanitation District Printed on 7/13/2026Page 4 of 4 powered by Legistar™ PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 1 of 20 PROFESSIONAL SERVICES AGREEMENT This PROFESSIONAL SERVICES AGREEMENT, (hereinafter referred to as “Agreement”), is made and entered into to be effective the 1st day of October, 2026, by and between the ORANGE COUNTY SANITATION DISTRICT, (hereinafter referred to as "OC SAN"), and AECOM Technical Services, Inc., (hereinafter referred to as "CONSULTANT"). OC SAN and CONSULTANT are referred to herein collectively as the "Parties" or individually as a "Party." WITNESSETH: WHEREAS, OC SAN desires to engage CONSULTANT for Supplemental Engineering Services, PSA2026-001, to provide qualified staff as described in Attachment “A”, Scope of Work; and Attachment “A1”, Rules of Engagement; and WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the requisite personnel and experience, and is capable of performing such services; and WHEREAS, OC SAN has adopted procedures for the selection of professional services and has proceeded in accordance with said procedures to select CONSULTANT to perform this work; and WHEREAS, OC SAN shall manage selection of a Consultant for Task Order(s) when requested after award of this Agreement based on the most appropriate qualifications and fit; and WHEREAS, at its regular meeting on July 22, 2026, the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee to approve this Agreement. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows: 1. SCOPE OF WORK CONSULTANT agrees to furnish necessary professional services to accomplish the Scope of Work attached hereto as Attachment “A", and is hereby incorporated into this Agreement. In the event of a conflict between the Scope of Work and this Agreement, the terms of this Agreement shall prevail. 2. COMPENSATION Total compensation shall be paid to CONSULTANT for the services in accordance with the following provisions: A. Time and Material: Not to Exceed Aggregate Amount OC SAN shall compensate CONSULTANT for services performed under this Agreement on a time and materials basis, not to exceed a maximum aggregate amount of Twenty-Seven Million Nine Hundred Thousand Dollars ($27,900,000) (“Total Compensation”) during the term of the Agreement. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 2 of 20 B. Hourly Rates As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus benefits, overhead, and profit) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT as set forth in Attachment “E” (attached hereto and incorporated herein by reference). OC SAN shall also pay to CONSULTANT a sum equal to the premium costs for overtime, charged on an hourly-rate basis, actually paid by CONSULTANT to the non-exempt personnel of CONSULTANT plus profit. Premium costs for overtime will not include fringe and overhead. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this Agreement. C. Overhead i. “Field Office Staff” are defined as project-assigned staff by CONSULTANT, working at OC SAN’s facilities for a project-assigned period exceeding ninety (90) continuous calendar days. The overhead rates for Field Office Staff are included in Attachment “E”. ii. “Home Office Staff” are defined as staff assigned by CONSULTANT, supporting the project-assigned work, either by working at CONSULTANT’s or Subconsultant’s offices or at OC SAN’s site for periods less than ninety (90) continuous calendar days. The overhead rates for Home Office Staff are included in Attachment “E”. D. Profit Profit for CONSULTANT and Subconsultants shall be five percent (5%). Addenda shall be governed by the same maximum Profit percentage. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this Agreement. E. Subconsultants For all Subconsultants, CONSULTANT may pay to Subconsultants total compensation on an hourly-rate basis per Attachment “E” - Fee Proposal and as specified in the Scope of Work. OC SAN shall pay to CONSULTANT the actual costs of Subconsultants, without markup. F. Reimbursable Direct Costs OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this Agreement (attached hereto and incorporated herein by reference). The reimbursement of the above-mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 3 of 20 and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at https://www.gsa.gov/travel/plan-book/per-diem-rates. Reimbursement. The CONSULTANT shall be responsible for the most economical and practical means or management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical. Returns. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN. Travel and travel arrangements. Any travel involving airfare, overnight stays or multiple day attendance must be approved by OC SAN in advance. Local Travel. Local Travel is considered travel by the CONSULTANT within OC SAN geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial, and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel. Lodging. Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN. Travel Meals. Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals. Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this Agreement. Actual Costs. OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN. OC SAN will not pay per diem for Field Office Staff nor will it pay for any relocation of staff to be assigned under this Agreement. G. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services described in CONSULTANT’s Task Authorizations will exceed seventy-five percent (75%) of the not-to-exceed amount of the Task Authorization, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 4 of 20 Any cost incurred in excess of the approved not-to-exceed amount, without the express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this Agreement. 3. REALLOCATION OF TOTAL COMPENSATION OC SAN shall have the right to approve a reallocation of the incremental amounts constituting the Total Compensation, provided that the Total Compensation is not increased. 4. PAYMENT A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period, in a format acceptable to OC SAN. CONSULTANT shall warrant and certify the accuracy of these costs and provide all support documentation required by OC SAN. CONSULTANT understands that submitted costs are subject to Section 16 Audit Provisions. B. Upon receipt of a properly prepared invoice, as described above, payment shall be made by OC SAN to CONSULTANT within sixty (60) calendar days. C. Upon satisfactory completion of the work performed hereunder and prior to final payment under this Agreement for such work, or prior settlement upon termination of this Agreement, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this Agreement other than such claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein. D. Pursuant to the California False Claims Act (Government Code sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this Agreement may be held liable for treble damages and up to a $10,000 civil penalty for each false claim submitted. This section shall also be binding on all Subconsultants. A CONSULTANT or Subconsultant shall be deemed to have submitted a false claim when the CONSULTANT or Subconsultant: (a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by OC SAN; (c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; (d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or (e) is a beneficiary of an inadvertent submission of a false claim to OC SAN, PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 5 of 20 and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim. 5. TERM This Agreement shall commence upon the effective date first written above, and shall continue in full force and effect through September 30, 2029, (Initial Term) unless earlier terminated or extended as provided in the Agreement. OC SAN, at its sole discretion, may elect to extend the term of this Agreement up to an additional twelve (12) months, commencing October 1, 2029, and continuing through September 30, 2030, (Option Term 1), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A” and Attachment “A1”. OC SAN, at its sole discretion, may elect to extend the term of this Agreement up to an additional twelve (12) months, commencing October 1, 2030, and continuing through September 30, 2031, (Option Term 2), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A” and Attachment “A1”. OC SAN’s election to extend the Agreement beyond the Initial Term shall not diminish its right to terminate the Agreement for OC SAN’s convenience or CONSULTANT’s default as provided elsewhere in this Agreement. The “maximum term” of this Agreement shall be from the effective date first written above through September 30, 2031, which period encompasses the Initial Term and two (2) Option Terms. 6. PREVAILING WAGES A. To the extent CONSULTANT intends to utilize employees who will perform work during the Agreement, as more specifically defined under Labor Code Section 1720, CONSULTANT shall be subject to prevailing wage requirements with respect to such employees. 7. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section 1771.4, the work is subject to compliance monitoring and enforcement by the DIR. B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 6 of 20 Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776. C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations. D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e). 8. CONFLICT OF INTEREST CODE OC SAN may designate some or all of the individuals performing services under the Agreement as “designated positions” subject to OC SAN’s Conflict of Interest Code. CONSULTANT employees or Subconsultants acting in these designated positions must comply with certain requirements under the Political Reform Act. CONSULTANT employees or Subconsultants acting in these designated positions must file an annual report identifying some or all of their financial interests such as sources of income, sources of gifts received from special sources of income and sources of gifts. Currently the limit is $630 per year from any one source. CONSULTANT and all its employees, staff, or personnel assigned to an OC SAN designated position shall comply with the Political Reform Act and related reporting requirements and gift limitation. 9. INDEPENDENT CONTRACTOR The CONSULTANT and Subconsultants shall be independent contractors and not agents or employees of OC SAN. Any provisions of this Agreement that may appear to give OC SAN the right to direct the CONSULTANT concerning the details of performing the professional services, or to exercise any control over such performance, shall mean only that the CONSULTANT shall follow the direction of OC SAN concerning the end results of the performance. 10. DOCUMENT OWNERSHIP – CONSULTANT PERFORMANCE A. Ownership of Documents for the professional services performed. All documents in all forms (electronic, paper, etc.), including, but not limited to, studies, sketches, drawings, computer printouts, disk files, and electronic copies prepared in connection with or related to the Scope of Work or professional services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed. OC SAN ownership entitlement arises upon payment or any partial payment for work performed and includes ownership of any and all work product completed prior to that payment. This Section shall apply whether the CONSULTANT’s professional services are terminated: a) by the completion of the Agreement, or b) in accordance with other provisions of this Agreement. Notwithstanding any PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 7 of 20 other provision of this paragraph or Agreement, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer printouts and disk files, and specifications. OC SAN acknowledges that documents prepared through professional services must be revised and sealed by a professional engineer prior to their reuse on another project. OC SAN acknowledges that it assumes all risk associated with reuse of such documents, which are not undertaken by CONSULTANT. B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the study or deliverable where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service rendered by CONSULTANT was not a proximate cause of the damage. 11. INSURANCE A. General i. Insurance shall be issued and underwritten by insurance companies acceptable to OC SAN. ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Workers’ Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent. iii. Coverage shall be in effect prior to the commencement of any work under this Agreement. B. General Liability The CONSULTANT shall maintain during the life of this Agreement, including the period of warranty, commercial general liability insurance written on an occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000) aggregate. If aggregate limits apply separately to this Agreement (as evidenced by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: premises-operations, blanket contractual liability (for this Agreement), products liability/completed operations (including any product manufactured or assembled), broad form property damage, blanket contractual liability, independent contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 8 of 20 accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) and Riggers/On Hook Liability must be included in the general liability policy and coverage must be reflected on the submitted certificate of insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor, or subcontractor performing work or rendering services on behalf of OC SAN in connection with the planning, development, and construction of the project. In all its insurance coverages related to the work, CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their officers, agents, or employees, or any other consultant, contractor, or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged. C. Automobile/Vehicle Liability Insurance The CONSULTANT shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: combined single limit of One Million Dollars ($1,000,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement. D. Umbrella Excess Liability The minimum limits of general liability and automobile liability insurance required, as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automobile liability. E. Workers’ Compensation Insurance The CONSULTANT shall provide such workers’ compensation insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including employer’s liability insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such workers’ compensation insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 9 of 20 Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones Act claims. F. Errors and Omissions/Professional Liability CONSULTANT shall maintain in full force and effect, throughout the term of this Agreement, standard industry form professional liability / errors and omissions insurance coverage with coverage limits of not less than Five Million Dollars ($5,000,000) in accordance with the provisions of this paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of five (5) years from the date of the completion of the services hereunder. In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of CONSULTANT during the course of performing services under the terms of this Agreement. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis, said policy shall be continued in full force and effect during the term of this Agreement or until completion of the services provided for in this Agreement, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts or omissions of CONSULTANT during the course of performing services under the terms of this Agreement. CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term. G. Drone Liability Insurance If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of One Million Dollars ($1,000,000) in a form acceptable by OC SAN. H. Proof of Coverage The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before work commences. OC SAN reserves the right to require, at any time, complete, certified copies of all required insurance policies, including endorsements, effecting the coverage required. The following are approved forms that must be submitted as proof of coverage: PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 10 of 20 •insurance form • (General Liability) CG 20 10 and CG 20 37 All other additional insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN. • (Automobile Liability) OC SAN approval. •subrogation endorsement provided by carrier for OC SAN approval. • Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below. I. Cancellation and Policy Change Notice The CONSULTANT is required to notify OC SAN in writing of any insurance cancellation notice it receives or other knowledge of pending or actual insurance policy cancellation within two (2) working days of receipt of such notice or acquisition of such knowledge. Additionally, the CONSULTANT is required to notify OC SAN in writing of any change in the terms of insurance, including reduction in coverage or increase in deductible/SIR, within two (2) working days of receipt of such notice or knowledge of same. Said notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Contracts, Purchasing & Materials Management Division J. Primary Insurance The general and automobile liability policies shall contain a “Primary and Non- Contributory” clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 11 of 20 K. Separation of Insured The general and automobile liability policies shall contain a “Separation of Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this Agreement, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property. M. Deductibles and Self-Insured Retentions Any deductible and/or self-insured retention must be declared to OC SAN on the certificate of insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses. N. Defense Costs The general and automobile liability policies shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits. O. Subconsultants The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work. P. Limits Are Minimums If the CONSULTANT maintains higher limits than any minimums shown above, then OC SAN requires and shall be entitled to coverage for the higher limits maintained by CONSULTANT. 12. KEY POSITIONS CONSULTANT shall notify OC SAN in advance changes to any key CONSULTANT employees or Subconsultants performing services under this Agreement. Positions considered to be Key Positions are Point of Contact, and any field office staff working under the Agreement. Should a CONSULTANT employee or Subconsultant within one of these categories become no longer available to OC SAN, CONSULTANT shall submit PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 12 of 20 the resume and qualifications of the proposed replacement to OC SAN for approval as soon as possible, but in no event later than seven (7) calendar days prior to the departure of the incumbent Key Position unless CONSULTANT is not provided with such notice by the departing staff. 13. SCOPE CHANGES In the event of a change in the Scope of Work or a change in Key Personnel or change in hourly rates as requested by OC SAN, the Parties hereto shall execute an Amendment to this Agreement setting forth with particularity all terms of the new Agreement. CONSULTANT’s compensation for additional services authorized and performed in accordance with this Agreement shall be agreed to by the Parties in writing prior to the time that the additional services are authorized. CONSULTANT hereby agrees to use any and all procedures, programs, and systems required by OC SAN to process and execute such Amendment(s), including, but not limited to, computer programs and systems. 14. PROJECT TEAM AND SUBCONSULTANTS Neither this Agreement nor any interest herein nor claim hereunder may be assigned by CONSULTANT either voluntarily or by operation of law, nor may all or any part of the Agreement be subcontracted by CONSULTANT, without the prior written consent of OC SAN. Consent by OC SAN shall not be deemed to relieve CONSULTANT of its obligation to comply fully with all terms and conditions of this Agreement. CONSULTANT shall provide to OC SAN, prior to execution of this Agreement, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used under this Agreement by CONSULTANT. CONSULTANT shall include a description of the work and services to be done by each Subconsultant and each of CONSULTANT’s team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant, broken down as indicated in Section 2- COMPENSATION. There shall be no substitution of the listed Subconsultants and CONSULTANT’s team members without prior written approval by OC SAN. 15. ENGINEERING REGISTRATION The CONSULTANT's personnel and Subconsultants are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered engineer but represents and agrees that wherever, in the performance of this Agreement, the services of a registered engineer is required, such services hereunder will be performed under the direct supervision of registered engineers who are registered in California. 16. AUDIT PROVISIONS A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents, and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this Agreement. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 13 of 20 The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this Agreement during the term of this Agreement and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all accounting records and documents, and any other financial data related to this Agreement. 17. LEGAL RELATIONSHIP BETWEEN PARTIES The legal relationship between the Parties hereto is that of an independent contractor and nothing herein shall be deemed to transform CONSULTANT, its staff, independent contractors, or Subconsultants into employees of OC SAN. CONSULTANT’S staff performing services under the Agreement shall at all times be employees and/or independent contractors of CONSULTANT. CONSULTANT shall monitor and control its staff and pay wages, salaries, and other amounts due directly to its staff in connection with the Agreement, as described in Attachment “A1” – Rules of Engagement. CONSULTANT shall be responsible for hiring, review, and termination of its staff and shall be accountable for all reports and obligations respecting them, such as social security, income tax withholding, unemployment compensation, workers’ compensation and similar matters. 18. NOTICES All notices hereunder and communications regarding the interpretation of the terms of this Agreement, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return receipt requested, postage prepaid. Notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Diane Marzano, Principal Contracts Administrator Copy: Martin Dix, Engineering Manager PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 14 of 20 Notices shall be mailed to CONSULTANT at: AECOM Technical Services, Inc. 999 Town & Country Road Orange, CA 92868 Attention: Bryan Paine All communication regarding the Scope of Work, will be addressed to the Engineering Manager. Direction from other OC SAN staff must be approved in writing by OC SAN’s Engineering Manager prior to action from the CONSULTANT. 19. TERMINATION OC SAN may terminate this Agreement at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination, CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination. CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this Agreement, when the same are due. Notice of termination shall be mailed to OC SAN at the address listed in Section 18 - NOTICES. 20. DOCUMENTS AND STUDY MATERIALS The documents and study materials for this Project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, electronic materials, computation and study materials in its files pertaining to the work described in this Agreement, which is requested in writing by OC SAN. 21. COMPLIANCE A. Labor CONSULTANT certifies by the execution of this Agreement that it pays employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all Federal, state and local directives and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment. B. Air Pollution CONSULTANT and its subconsultants and subcontractors shall comply with all applicable Federal, state, and local air pollution control laws and regulations. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 15 of 20 C. Iran Contracting Act CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208). D. California Air Resources Board Mobile Source Regulations CONSULTANT and its subconsultants and subcontractors shall comply with the following California Air Resources Board Mobile Source Regulations: • Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6 • Truck & Bus Regulation (T&B): 13 CCR 2025 • Clean Truck Check (CTC): 13 CCR 2195-2199.1 • Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2 E. California Voluntary Protection Program Annual Reporting Requirement If CONSULTANT will potentially work 1,000 combined hours in a quarter, for the term of the Agreement, CONSULTANT shall provide an annual report detailing its safety and health information, including, but not limited to, its total number of employees, work hours, number of injuries and illnesses, and number of injury and illness cases involving days away from work, restricted work activity and/or job transfer. CONSULTANT shall furnish this report to OC SAN no later than January 20th each calendar year. Failure to provide this data by the required due date may result in suspension of CONSULTANT’s services with OC SAN. Any delay arising out of or resulting from such suspension shall be CONSULTANT’s sole responsibility and considered CONSULTANT caused delay, which shall not be compensable by OC SAN. 22. AGREEMENT EXECUTION AUTHORIZATION Both Parties do covenant that each individual executing this document by and on behalf of each Party is a person duly authorized to execute this Agreement for that Party. 23. DISPUTE RESOLUTION In the event of a dispute arising between the Parties regarding performance or interpretation of this Agreement, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services. 24. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which he may be entitled. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 16 of 20 25. INDEMNIFICATION To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN, which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, consultants, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and OC SAN’s general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in carrying out its obligations under this Agreement to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, consultants, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from: (A) the active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or (C) the independent action of a third party who is neither one of the Indemnified Parties nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them. CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder. CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the provisions of this Agreement. Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this Agreement are contractual and the result of negotiation between the parties hereto. Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting Party, shall not be employed in the interpretation of this Agreement. CONSULTANT is indemnified in OC SAN’s standard construction contracts. This indemnification is in the General Conditions which are attached to OC SAN’s standard construction contracts when these contracts are issued. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 17 of 20 26. DUTY TO DEFEND The duty to defend hereunder is wholly independent of and separate from the duty to indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims. CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this Agreement until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 27. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES CONSULTANT shall comply with all OC SAN policies and procedures, including, but not limited to, the Contractor Safety Standards, as applicable, and Human Resources Policies, all as may be amended from time to time. 28. CLOSEOUT When OC SAN determines that all work authorized under the Agreement is fully complete and that OC SAN requires no further work from CONSULTANT, or the Agreement is otherwise terminated or expires in accordance with the terms of the Agreement, OC SAN shall give the CONSULTANT written notice that the Agreement will be closed out. CONSULTANT shall submit all outstanding billings, work submittals, deliverables, reports or similarly related documents as required under the Agreement within thirty (30) days of receipt of notice of Agreement closeout. Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the Agreement and will either: i. Give the CONSULTANT a final Agreement Acceptance: or ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in the Agreement. Such support must be provided within the timeframe requested by OC SAN. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 18 of 20 Notwithstanding the final Agreement acceptance, the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise), and the CONSULTANT shall remain obligated under all those provisions of the Agreement which expressly or by their nature extend beyond and survive final Agreement Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final Agreement Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or Agreement with, the CONSULTANT’s request for final Agreement Acceptance. 29. PROHIBITION During the term of this Agreement, CONSULTANT and its Subconsultants may not propose on any engineering or construction-related projects advertised by or on behalf of OC SAN if such work presents actual or perceived conflict of interest with CONSULTANT’s assignments with OC SAN. CONSULTANT and its Subconsultants shall promptly disclose to OC SAN when such conflict exists prior to participating in any work as advertised by OC SAN or on its behalf. CONSULTANT and its Subconsultants acknowledge and agree that OC SAN’s determination regarding such conflicts that may impact CONSULTANT’s and its Subconsultants’ ability to propose on the work as described herein shall be final and cannot be appealed. 30. ENTIRE AGREEMENT This Agreement constitutes the entire understanding and agreement between the Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 19 of 20 IN WITNESS WHEREOF, this Agreement has been executed in the name of OC SAN and CONSULTANT by their respective duly authorized officers as of the day and year first written above. CONSULTANT: AECOM TECHNICAL SERVICES, INC. By _______________________________ _________________ Date __________________________________________________ Printed Name & Title ORANGE COUNTY SANITATION DISTRICT By _______________________________ _________________ Christine Marick Date Board Vice-Chairwoman By _______________________________ _________________ Kelly A. Lore Date Clerk of the Board By _______________________________ _________________ Kevin Work Date Purchasing & Contracts Manager Attachments: Attachment “A” – Scope of Work Attachment “A1” – Rules of Engagement Attachment “B” – Not Used Attachment “C” – Not Attached Attachment “D” – Allowable Direct Costs Attachment “E” – Fee Proposal Attachment “F” – Not Used Attachment “G” – Not Attached Attachment “H” – Not Used Attachment “I” – Not Used PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 20 of 20 Attachment “J” – Not Attached Attachment “K” – Not Used Attachment “L” – Contractor Safety Standards Attachment “M” – Not Attached Attachment “N” – Not Attached Attachment “O” – Not Attached Attachment “P” – Human Resources Policies DM:ms ATTACHMENT “A” SCOPE OF WORK SCOPE OF WORK PSA2026-001 Page 1 of 12 ATTACHMENT "A" SCOPE OF WORK I. SUMMARY The Orange County Sanitation District (OC SAN) is a special district responsible for wastewater conveyance and treatment for Northern and Central Orange County, California. OC SAN is a public agency that operates one of the largest wastewater facilities in the United States of America. OC SAN is soliciting Proposals to provide Supplemental Engineering Services to support its engineering projects, which includes large and small capital projects and operationally funded repair projects. II. BACKGROUND OC SAN has budgeted for a 10-year $3.6 billion capital improvement program, the vast majority of which is managed by the Engineering Department. OC SAN also has an active asset management program which includes many repair projects that, due to their complexity, are managed by its Engineering Department. III. PROFESSIONAL SERVICES REQUIRED The following descriptions cover the types of professional services OC SAN will require under this Agreement. OC SAN will determine when specific services are required. The mechanisms for requesting, reviewing, authorizing, and terminating services under this Agreement are documented in Attachment "A1" - Rules of Engagement. As described in that attachment, work assignments will fall into one of the following types: • Task Authorizations. Task Authorizations have formal Scope of Work and the CONSULTANT submits a proposal with a fee. • Task Directives. Task Directives are typically smaller than Task Authorizations where OC SAN provides a scope and a not-to-exceed fee amount that will be negotiated with the CONSULTANT. • Program Role Assignments. In Program Role Assignments, the CONSULTANT shall provide an appropriately qualified and experienced professional to fulfill the project role on a portfolio of projects. OC SAN will authorize specific tasks to be completed by the CONSULTANT and will require the CONSULTANT to provide staff to fill designated roles on specific projects or within the Engineering Program, as described in Attachment “A1” – Rules of Engagement. SCOPE OF WORK PSA2026-001 Page 2 of 12 IV. ENGINEERING DEPARTMENT ROLES AND RESPONSIBILITIES Architecture Design and oversee design by CONSULTANT’s of new building and tenant improvement projects. Work with City Building/Planning Departments, Fire Departments, and other regulatory agencies as a liaison on behalf of OC SAN to confirm projects comply with permitting and code requirements. Prepare more complex plan clarifications and changes in response to Contractor's request for information during construction and verify that facilities constructed meet design specifications and regulatory requirements. Engineering - Construction Management Construction management activities include the following: • Perform a variety of work functions supporting the design and construction of wastewater treatment and collection systems. • Review construction documents including plans and specifications; interpret plans and specifications for construction work performed by OC SAN's Contractors; review submittals for material and equipment conformance to design specifications and plans; ensure contractual compliance with plans, specifications, codes, and safety requirements; verify that materials being incorporated into project are per specification and with approved construction practices; and coordinate equipment isolations, shutdowns, and equipment and process tie-ins. • Prepare progress payments to the Contractor. • Perform analysis of change orders; negotiate fair and reasonable costs for change orders; and prepare change order documentation. • Oversee the start-up of facilities and schedule staff training. • Provide technical assistance and support to engineers and project managers. • Prepare a variety of administrative and technical memos, letters, and correspondence. • Perform constructability reviews. • Maintain comprehensive contractual records and periodically monitor progress of all goods and service agreements from inception through completion to enforce milestones, deliverables, and post-contract warranties. Engineering - Civil / Mechanical Prepare CONSULTANT Scope of Work. Review proposals and assist OC SAN in the CONSULTANTS’ selection process. SCOPE OF WORK PSA2026-001 Page 3 of 12 Design or oversee design by CONSULTANT’s of sanitary sewers, sewer rehabilitation, mechanical piping systems, wastewater treatment systems, reclaimed water systems, lift stations, etc. including calculations. Lead design reviews to perform a comprehensive multi- discipline design review on assigned projects. Prepare detailed drawings, technical specifications, and calculations for in-house designs on small projects. Respond to engineering bid questions and addenda. Perform construction support services, respond to Contractor's request for information, review construction submittals and verify that equipment meets design specifications, prepare design changes, review Contractor’s requested design changes, and support startup and commissioning. Engineering - Electrical Provide electrical engineering services including design, design review, interdisciplinary review of design documents, and construction support service for collections and wastewater treatment plant facilities. Design and oversee design by CONSULTANT’s for medium voltage and low voltage electrical distribution systems including switchgear, motor control centers and standby power. Design includes single line diagrams, elementary diagrams, motor control schematics, short circuit calculations, protective device coordination studies, raceway/wire design, and hazardous area classification. Perform construction support services, respond to Contractor's request for information, review construction submittals and verify that equipment meets design specifications, prepare design changes, review Contractor’s requested design changes, review InterNational Electrical Testing Association (NETA) test results, and perform electrical system startup and commissioning for standby power and low and medium-voltage systems. Perform short circuit calculations and protective device coordination studies utilizing Electrical Transient Analyzer Program (ETAP) software. Engineering - Instrumentation and Control Provide instrumentation and control engineering services including design, design review, interdisciplinary review of design documents, construction support service, and commissioning support for collections and wastewater treatment plant control systems. Design and oversee design by CONSULTANT’s for process and instrumentation diagrams, control strategies, control system network diagrams, control system input/output lists, control panel drawings, and commissioning procedures. Perform construction support services, respond to Contractor's request for information, review construction submittals and verify that equipment meets design specifications, prepare design changes, review Contractor’s requested design changes, and support startup and commissioning. SCOPE OF WORK PSA2026-001 Page 4 of 12 Engineering - Commissioning Coordinator Provide technical leadership and management of the development of commissioning procedures during design; review the proposed construction sequencing and commissioning packages established during design; review finalized commissioning procedures during construction; work closely and coordinate with the Contractor's commissioning coordinator; provide oversight of the Contractor's commissioning and start-up process and coordinate startups with operations and maintenance; coordinate OC SAN's inspection, control system programming, and engineering resources to support the Contractor's commissioning process; track outstanding commissioning items and support their resolution and work closely with the Resident Engineer to provide commissioning status and notification of any issues or concerns. The commissioning coordinator shall have knowledge in electrical, instrumentation, control systems, and process control. Engineering - Structural Provide structural analysis as needed to recommend structural improvements to existing facilities, analyze structural failures, and recommend repairs. Design and oversee design by CONSULTANT’s of structural systems for collections and wastewater facilities. Review proposals, technical memoranda, and designs prepared by others and prepare engineering analysis. Prepare detailed drawings, technical specifications, and calculations for in-house designs on small projects. Perform construction support services, respond to Contractor’s requests for information, review construction submittals and verify that equipment meets design specifications and regulatory requirements, prepare more complex structural engineering design changes during construction and review Contractor’s requested design changes. Inspection Various disciplines may need continuous construction inspection including Civil, Structural, Pipeline, Mechanical, Electrical, and Instrumentation for rehabilitation and replacement of collections and wastewater treatment plant facilities. Inspection activities include the following: • Provide construction inspection for plant and collection facilities construction work performed by Contractors to confirm contractual compliance with plans, specifications, codes, regulations, and OC SAN's safety standards. • Prepare a variety of reports and documentation. • Review construction documents including plans and specifications. • Review construction submittals. • Inspect plant and collection facilities construction work performed by Contractors. SCOPE OF WORK PSA2026-001 Page 5 of 12 • Verify that materials being incorporated into project are per specification and with approved construction practices. • Coordinate equipment and process isolations, shutdowns, and tie-ins. • Assist safety representatives with job hazard analysis. • Observe Contractors work safety environment and compliance with OC SAN's safety standards, Cal/OSHA, regulations, and traffic control requirements and work with Contractor to establish and maintain a safe construction project for employees, customers, and the public. • Document and follow-up on actions regarding safety, traffic control plans, and working practices. • Assist in the maintenance of accurate as-built contract drawings. • Verify Contractor as-built drawings are maintained and correct. • Assist Resident Engineers on requests for information, field change orders, plan clarifications, and plan changes. • Review and approve final drawings for the preparation of record drawings. • Prepare and maintain necessary construction inspection records and reports as a means of formal documentation including daily inspection reports, photo-logs, field test results, force account reports, extra work requests, project submittal files, and individual project logs. • Assist Resident Engineer in reviewing the Contractor’s monthly progress invoices. • Attend construction meetings. • Participate in commissioning. • Perform field walks and develop punch lists. • Work with Contractors, regulatory agencies, utilities, city officials, and the general public throughout the construction project to coordinate work to be accomplished and ensure the project is completed successfully with minimum impact on the public or OC SAN facilities. Project Management Project management functions for major capital projects include developing schedules, cost estimates, and staffing requirements; assembling and leading project teams; planning, directing, and coordinating activities of projects to confirm that goals and objectives of projects are accomplished on schedule and within prescribed budget; inspecting quality and quantity of work; managing the selection of outside CONSULTANT’s; and preparing and presenting reports and other necessary correspondence on assigned projects. SCOPE OF WORK PSA2026-001 Page 6 of 12 Manage a project or group of projects through all six phases of the Engineering Project Life Cycle including project development, preliminary design, design, construction and installation, commissioning, and closeout. Manage, direct, and coordinate activities of the project team to confirm the project progresses on schedule within prescribed budget and with acceptable quality. Confer with project team to provide technical advice and resolve problems and conduct project team meetings to confirm adequate communication of project status. Perform periodic review of assigned work to confirm that the work is satisfactory and is completed according to plan. Interface with senior management, peers, project staff, CONSULTANT’s, customers, and users as necessary to coordinate project execution and inform stakeholders of project status and possible outcomes. Prepare project reports for the Board of Directors, management, and others and make presentations as necessary. Provide project management oversight of the selection process of outside CONSULTANT’s; oversee the bid, proposal, and selection/purchase recommendation process for major capital projects; solicit proposals; review proposals; assist OC SAN's evaluation teams with selection of CONSULTANT’s; negotiate the fee; and establish schedules and performance criteria. Work with CONSULTANT’s on project planning, preparation, scheduling, and execution of contracts and ensure work is completed on time and in conformance with plans and specifications. Apply project management tools as required to address the financial aspects and impacts of project variables such as delays to the project schedule and changes to the project scope. Serve as a liaison for the Engineering Department with other OC SAN departments, divisions, and outside agencies and provide project representation to commissions, committees, and task forces. Support - Administrative Administrative support activities include the following: • Perform a variety of secretarial, advanced clerical, and routine administrative and programmatic work in support of assigned projects or programs, division, or department. • Participate in the administration of approved policies and procedures. • Prepare financial analysis and a variety of reports as required. • Provide information and assistance to other assigned project or program staff regarding assigned programs, policies, and procedures. SCOPE OF WORK PSA2026-001 Page 7 of 12 Support - Submittals Submittals support activities include the following: • Coordinates the submittal review process between Contractors and OC SAN staff. • Reviews submittals to determine compliance with the submittal submission processes. • Consolidates submittal comments for final review. • Finalizes and distributes facilities records. Support - Cost Estimating Cost estimating activities include the following: • Prepare cost estimates to provide detailed information regarding quantity and cost of materials and labor. • Develop processes and/or techniques that provide clear and standard estimating methods across projects. • Provide data for analytical comparisons between projects. • Review project cost estimates as projects advance through the design process. • Review engineering plans and specifications to determine materials and quantities required by project specifications. • Recommend cost saving changes. • Review cost estimates and change orders submitted by construction Contractors and provide recommendations. • Prepare general budget estimates for new projects. Estimating shall include all disciplines including architectural, civil, structural, mechanical, plumbing, heating and air conditioning, fire protection, electrical, and control systems. Support - Construction Scheduling Perform a variety of scheduling reviews and analyses involving wastewater treatment and collection systems, including the following activities: • Review design submittals prior to bid to confirm scope is achievable in the time stipulated. • Establish clear specifications and enforcement provisions with the Contractors by placing schedule performance and proof of impact on the Contractors. • Review construction Contractor's schedules for effective Contractor performance. Identify changes to the critical path. • Review baseline schedule submittals. SCOPE OF WORK PSA2026-001 Page 8 of 12 • Support the Resident Engineer and Project Manager during scheduling meetings so they are effective and productive. • Maintain careful documentation of all schedule submittals so that any requests for time adjustments can be measured against the approved schedule in place at the time of impact is claimed. • Monitor actual progress versus planned progress. Provide exception reporting and recommend actions. • Perform analysis of change orders such as time impact analysis (TIA) and productivity claims. Support - Construction Claims / Mitigation Prepare detailed analysis of Contractor-submitted requests for change, delay claims, TIAs, and/or government code claims including productivity loss claims, claims for differing site conditions, and/or total cost claims. Work may include analysis of liability, review of contract language and supporting documents, validating extended overhead costs, and review and analysis of any other supporting documentation. Work may also include a proactive strategy to reduce exposure, review of reporting requirements and practices, and conferring with project teams and/or managers to effectively implement practices to reduce liability and/or risk. Support - Computer Aided Design Drafting and Design Computer Aided Design (CAD) drafting and design support include the following activities: • Use CAD equipment to provide support to Engineers by preparing layouts, detail drawings, sketches, and diagrams. Drawings are to include all views and dimensions necessary for construction of wastewater treatment and collection systems. Work must comply with OC SAN CAD Manual. • Draft engineering drawings of proposed wastewater treatment facility construction projects from engineer's design drawings including structures and notations and review maps and existing drawings to determine utility locations, elevations, and other related information. • Consolidate changes made on drawings by CONSULTANT’s, engineers and inspectors with Contractor's as-built drawings to draft final record drawings on a wide variety of wastewater treatment facility construction projects. • Conduct field visits to confirm existing conditions and finished construction configuration. • Make appropriate notes of sizes, diameters, locations, and other significant information and return to project engineer. • Provide technical assistance and support to engineers and engineering aides. SCOPE OF WORK PSA2026-001 Page 9 of 12 Support - Outreach Provide community and stakeholder outreach support for OC SAN projects during design and construction phases. Work may include the following activities: • Develop outreach plans, schedules, and budgets identifying project areas, community concerns, community events, demographics, and language needs. • Identify stakeholders and communication strategies, including property owners, tenants, businesses, schools, and public officials. • Plan, organize, and staff public meetings, including presentation development and meeting summaries. • Conduct door-to-door or neighborhood outreach to impacted residents and businesses. • Develop and design outreach materials such as fact sheets, notifications, press releases, website updates, and social media content consistent with OC SAN branding. • Develop and implement crisis communication plans. V. LOGISTICS AND CONTRACT MANAGEMENT Work Location CONSULTANT's on-site staff shall work from at OC SAN's facilities in Fountain Valley or Huntington Beach, California. At times, work may be required at other OC SAN facilities or at job site locations away from OC SAN facilities. At the CONSULTANT's discretion and concurrence with the OC SAN representative, the assigned CONSULTANT staff may be located at CONSULTANT's home office. Advanced coordination with OC SAN may be required for CONSULTANT staff working at OC SAN facilities on OC SAN holidays. Point of Contact/Supervision CONSULTANT shall designate an individual as the single point of contact to direct efforts in fulfilling contracted obligations under this Agreement. The selected designee shall be responsible for the direct supervision of assigned staff, including such activities as directing work, work schedules, quality of work performed, technical oversight, vacation requests, discipline, etc. The selected designee shall not be changed without prior written notification to the OC SAN representative. CONSULTANT shall be responsible for supervision of its entire staff, including the requirements defined in Attachment "A1" - Rules of Engagement. SCOPE OF WORK PSA2026-001 Page 10 of 12 OC SAN Project Document Management CONSULTANT's staff assigned to work on OC SAN projects shall save project related deliverables, documents, and/or records in OC SAN accessible locations (i.e., OC SAN SharePoint servers and/or OC SAN licensed cloud-based applications such as Bluebeam, PMWeb or One Drive) as applicable to the project assignment to comply with Public Records Act requirements. Accessibility to these locations will be provided by OC SAN. Provided Facilities & Equipment OC SAN shall provide the following for CONSULTANT's on-site staff: • Furnished office space at OC SAN • Computers, software, network, and printing capabilities • Office telephone Personal Protective Equipment CONSULTANT staff assigned to OC SAN facilities may be exposed to known plant process and work hazards and therefore shall have appropriate Personal Protective Equipment (PPE) such as: eye and face protection (safety glasses), head protection (hard hat), hand protection (gloves), foot protection (safety toed shoes), high visibility clothing (Class 3 vests), hearing protection, personal gas monitor (4 gas), fall protection (harness and lanyard), and other forms of PPE. CONSULTANT shall provide all equipment and training necessary to comply with OC SAN safety polices. Refer to Attachment "L" - Contractor Safety Standards. Time Tracking & Invoicing CONSULTANT shall submit invoices, including cost and hours, monthly. Invoice shall be submitted no later than the 15th of each month. OC SAN maintains a project controls system containing detailed cost and hours information for all Engineering Projects. The format for reporting hours shall be in an importable format such as Microsoft Excel and contain, at a minimum, the following items: Column Description Project Number OC SAN shall provide a list of project numbers. These numbers are subject to change as new projects are added, and existing projects are completed. Work Package Number OC SAN shall provide a list of work package numbers. The work package numbers are subject to change as a project transitions from one phase to the next. Employee ID Each employee included in the hours report must contain a unique identification number. Employee Name Employee name. SCOPE OF WORK PSA2026-001 Page 11 of 12 Work Date The week ending date when work was performed. Hours by Week The total number of hours worked for the week. In addition, it may be necessary to report overtime hours which will require a separate report. Total Burdened Cost The total burdened cost shall include actual salary, fringe costs, overhead, and profit by person. Work Quality CONSULTANT shall be responsible for the professional quality and technical competence of assigned staff supplied to OC SAN. Additionally, the firm shall be responsible for the coordination of all efforts and other services furnished under the Agreement. Billing Guidance The following guidance establishes which activities performed by CONSULTANT are considered billable and non-billable under this Agreement. Non-Billable Activities The following activities are not billable to OC SAN: • Proposal and staffing activities: Time spent identifying staff, preparing or submitting proposal material, or negotiating budgets is considered marketing and is not billable. • Pre-selection communications: Before OC SAN selects a firm for a request, any clarifications, questions, or discussions should be directed to the designated Submitter. CONSULTANT shall not consult directly with OC SAN staff outside of the Submitter. Any such time is non-billable. • General training: Technical training is not billable except for training specific to OC SAN requirements, procedures, or standards. • Internal performance management: Time spent addressing or documenting performance issues of assigned staff is not billable. • Other OC SAN-unrequested activities: Any tasks performed without a formal request or outside of authorized Scope of Work, task directives, or task authorizations are non- billable. Billable Activities The following activities are generally billable to OC SAN: • Preparing and submitting invoices. • Managing the CONSULTANT’s internal billing codes. • Preparing progress reports for assigned tasks. • Providing technical guidance and oversight to assigned staff. • Managing task directives and task authorizations. • Performing quality control for task directives and task authorizations. SCOPE OF WORK PSA2026-001 Page 12 of 12 • Attending regular coordination meetings with OC SAN Management. • Training CONSULTANT staff on OC SAN-specific requirements, procedures, and standards. Program-level support activities, rather than project-specific work, shall be billed to Project SP-195, Work Package 3210. Management of Resource Assignments OC SAN will maintain a cloud-based workflow tool to request, review, authorize, and close resource assignments. That workflow tool is currently PMWeb. CONSULTANT's Point of Contact shall utilize this tool to track all requests through their life cycles. OC SAN will use this workflow tool to verify that any invoiced costs have been duly approved through the workflow tool. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 1 of 20 PROFESSIONAL SERVICES AGREEMENT This PROFESSIONAL SERVICES AGREEMENT, (hereinafter referred to as “Agreement”), is made and entered into to be effective the 1st day of October, 2026, by and between the ORANGE COUNTY SANITATION DISTRICT, (hereinafter referred to as "OC SAN"), and Jacobs Project Management Co., (hereinafter referred to as "CONSULTANT"). OC SAN and CONSULTANT are referred to herein collectively as the "Parties" or individually as a "Party." WITNESSETH: WHEREAS, OC SAN desires to engage CONSULTANT for Supplemental Engineering Services, PSA2026-001, to provide qualified staff as described in Attachment “A”, Scope of Work; and Attachment “A1”, Rules of Engagement; and WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the requisite personnel and experience, and is capable of performing such services; and WHEREAS, OC SAN has adopted procedures for the selection of professional services and has proceeded in accordance with said procedures to select CONSULTANT to perform this work; and WHEREAS, OC SAN shall manage selection of a Consultant for Task Order(s) when requested after award of this Agreement based on the most appropriate qualifications and fit; and WHEREAS, at its regular meeting on July 22, 2026, the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee to approve this Agreement. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows: 1. SCOPE OF WORK CONSULTANT agrees to furnish necessary professional services to accomplish the Scope of Work attached hereto as Attachment “A", and is hereby incorporated into this Agreement. In the event of a conflict between the Scope of Work and this Agreement, the terms of this Agreement shall prevail. The standard of care applicable to CONSULTANT’s services will be the degree of skill and diligence normally employed by professional engineers or consultants performing the same or similar services at the time CONSULTANT’s services are performed. 2. COMPENSATION Total compensation shall be paid to CONSULTANT for the services in accordance with the following provisions: PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 2 of 20 A. Time and Material: Not to Exceed Aggregate Amount OC SAN shall compensate CONSULTANT for services performed under this Agreement on a time and materials basis, not to exceed a maximum aggregate amount of Twenty-Seven Million Nine Hundred Thousand Dollars ($27,900,000) (“Total Compensation”) during the term of the Agreement. B. Hourly Rates As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus benefits, overhead, and profit) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT as set forth in Attachment “E” (attached hereto and incorporated herein by reference). OC SAN shall also pay to CONSULTANT a sum equal to the premium costs for overtime, charged on an hourly-rate basis, actually paid by CONSULTANT to the non-exempt personnel of CONSULTANT plus profit. Premium costs for overtime will not include fringe and overhead. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this Agreement. C. Overhead i. “Field Office Staff” are defined as project-assigned staff by CONSULTANT, working at OC SAN’s facilities for a project-assigned period exceeding ninety (90) continuous calendar days. The overhead rates for Field Office Staff are included in Attachment “E”. ii. “Home Office Staff” are defined as staff assigned by CONSULTANT, supporting the project-assigned work, either by working at CONSULTANT’s or Subconsultant’s offices or at OC SAN’s site for periods less than ninety (90) continuous calendar days. The overhead rates for Home Office Staff are included in Attachment “E”. D. Profit Profit for CONSULTANT and Subconsultants shall be five percent (5%). Addenda shall be governed by the same maximum Profit percentage. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this Agreement. E. Subconsultants For all Subconsultants, CONSULTANT may pay to Subconsultants total compensation on an hourly-rate basis per Attachment “E” - Fee Proposal and as specified in the Scope of Work. OC SAN shall pay to CONSULTANT the actual costs of Subconsultants, without markup. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 3 of 20 F. Reimbursable Direct Costs OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this Agreement (attached hereto and incorporated herein by reference). The reimbursement of the above-mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at https://www.gsa.gov/travel/plan-book/per-diem-rates. Reimbursement. The CONSULTANT shall be responsible for the most economical and practical means or management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical. Returns. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN. Travel and travel arrangements. Any travel involving airfare, overnight stays or multiple day attendance must be approved by OC SAN in advance. Local Travel. Local Travel is considered travel by the CONSULTANT within OC SAN geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial, and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel. Lodging. Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN. Travel Meals. Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals. Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this Agreement. Actual Costs. OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN. OC SAN will not pay per diem for Field Office Staff nor will it pay for any relocation of staff to be assigned under this Agreement. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 4 of 20 G. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services described in CONSULTANT’s Task Authorizations will exceed seventy-five percent (75%) of the not-to-exceed amount of the Task Authorization, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this Agreement. 3. REALLOCATION OF TOTAL COMPENSATION OC SAN shall have the right to approve a reallocation of the incremental amounts constituting the Total Compensation, provided that the Total Compensation is not increased. 4. PAYMENT A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period, in a format acceptable to OC SAN. CONSULTANT shall warrant and certify the accuracy of these costs and provide all support documentation required by OC SAN. CONSULTANT understands that submitted costs are subject to Section 16 Audit Provisions. B. Upon receipt of a properly prepared invoice, as described above, payment shall be made by OC SAN to CONSULTANT within thirty (30) calendar days. C. Upon satisfactory completion of the work performed hereunder and prior to final payment under this Agreement for such work, or prior settlement upon termination of this Agreement, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this Agreement other than such claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein. D. Pursuant to the California False Claims Act (Government Code sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this Agreement may be held liable for treble damages and up to a $10,000 civil penalty for each false claim submitted. This section shall also be binding on all Subconsultants. A CONSULTANT or Subconsultant shall be deemed to have submitted a false claim when the CONSULTANT or Subconsultant: (a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 5 of 20 made or used a false record or statement to get a false claim paid or approved by OC SAN; (c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; (d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or (e) is a beneficiary of an inadvertent submission of a false claim to OC SAN, and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim. 5. TERM This Agreement shall commence upon the effective date first written above, and shall continue in full force and effect through September 30, 2029, (Initial Term) unless earlier terminated or extended as provided in the Agreement. OC SAN, at its sole discretion, may elect to extend the term of this Agreement up to an additional twelve (12) months, commencing October 1, 2029, and continuing through September 30, 2030, (Option Term 1), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A” and Attachment “A1”. OC SAN, at its sole discretion, may elect to extend the term of this Agreement up to an additional twelve (12) months, commencing October 1, 2030, and continuing through September 30, 2031, (Option Term 2), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A” and Attachment “A1”. OC SAN’s election to extend the Agreement beyond the Initial Term shall not diminish its right to terminate the Agreement for OC SAN’s convenience or CONSULTANT’s default as provided elsewhere in this Agreement. The “maximum term” of this Agreement shall be from the effective date first written above through September 30, 2031, which period encompasses the Initial Term and two (2) Option Terms. 6. PREVAILING WAGES A. To the extent CONSULTANT intends to utilize employees who will perform work during the Agreement, as more specifically defined under Labor Code Section 1720, CONSULTANT shall be subject to prevailing wage requirements with respect to such employees. 7. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section 1771.4, the work is subject to compliance monitoring and enforcement by the DIR. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 6 of 20 B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776. C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations. D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e). 8. CONFLICT OF INTEREST CODE OC SAN may designate some or all of the individuals performing services under the Agreement as “designated positions” subject to OC SAN’s Conflict of Interest Code. CONSULTANT employees or Subconsultants acting in these designated positions must comply with certain requirements under the Political Reform Act. CONSULTANT employees or Subconsultants acting in these designated positions must file an annual report identifying some or all of their financial interests such as sources of income, sources of gifts received from special sources of income and sources of gifts. Currently the limit is $630 per year from any one source. CONSULTANT and all its employees, staff, or personnel assigned to an OC SAN designated position shall comply with the Political Reform Act and related reporting requirements and gift limitation. 9. INDEPENDENT CONTRACTOR The CONSULTANT and Subconsultants shall be independent contractors and not agents or employees of OC SAN. Any provisions of this Agreement that may appear to give OC SAN the right to direct the CONSULTANT concerning the details of performing the professional services, or to exercise any control over such performance, shall mean only that the CONSULTANT shall follow the direction of OC SAN concerning the end results of the performance. 10. DOCUMENT OWNERSHIP – CONSULTANT PERFORMANCE A. Ownership of Documents for the professional services performed. All documents in all forms (electronic, paper, etc.), including, but not limited to, studies, sketches, drawings, computer printouts, disk files, and electronic copies prepared in connection with or related to the Scope of Work or professional services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed. OC SAN ownership entitlement arises upon payment or any partial payment for work performed and includes ownership of any and all work product completed PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 7 of 20 prior to that payment. This Section shall apply whether the CONSULTANT’s professional services are terminated: a) by the completion of the Agreement, or b) in accordance with other provisions of this Agreement. Notwithstanding any other provision of this paragraph or Agreement, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer printouts and disk files, and specifications. OC SAN acknowledges that documents prepared through professional services must be revised and sealed by a professional engineer prior to their reuse on another project. OC SAN acknowledges that it assumes all risk associated with reuse of such documents, which are not undertaken by CONSULTANT. B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the study or deliverable where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service rendered by CONSULTANT was not a proximate cause of the damage. 11. INSURANCE A. General Insurance shall be issued and underwritten by insurance companies acceptable to OC SAN based on the following requirements: i. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Workers’ Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent. ii. Coverage shall be in effect prior to the commencement of any work under this Agreement. B. General Liability The CONSULTANT shall maintain during the life of this Agreement, including the period of warranty, commercial general liability insurance written on an occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000) general aggregate. If aggregate limits apply separately to this Agreement (as evidenced by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: premises-operations, contractual liability coverage applicable to the liabilities assumed under this Agreement, products liability/completed operations (including any product manufactured or PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 8 of 20 assembled), broad form property damage, contractual liability coverage applicable to the liabilities assumed under this Agreement, independent contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) must be included in the general liability policy and coverage must be reflected on the submitted certificate of insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor, or subcontractor performing work or rendering services on behalf of OC SAN in connection with the planning, development, and construction of the project. In all insurance coverages related to the work, CONSULTANT shall cause its insurers to waive rights of subrogation against OC SAN and its officers, employees, and agents with respect to claims arising out of CONSULTANT’s performance of the work. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged. C. Automobile/Vehicle Liability Insurance The CONSULTANT shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: combined single limit of One Million Dollars ($1,000,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement. D. Umbrella Excess Liability The minimum limits of general liability and automobile liability insurance required, as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automobile liability. E. Workers’ Compensation Insurance The CONSULTANT shall provide such workers’ compensation insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including employer’s liability insurance with a minimum limit of One Million Dollars ($1,000,000) each accident, One Million Dollars ($1,000,000) PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 9 of 20 disease each employee, and One Million Dollars ($1,000,000) disease policy limit. Such workers’ compensation insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones Act claims. F. Errors and Omissions/Professional Liability CONSULTANT shall maintain in full force and effect, throughout the term of this Agreement, standard industry form professional liability / errors and omissions insurance coverage with coverage limits of not less than Five Million Dollars ($5,000,000) per claim and Five Million Dollars ($5,000,000) aggregate in accordance with the provisions of this paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of five (5) years from the date of the completion of the services hereunder. In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of CONSULTANT during the course of performing services under the terms of this Agreement. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis, said policy shall be continued in full force and effect during the term of this Agreement or until completion of the services provided for in this Agreement, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts or omissions of CONSULTANT during the course of performing services under the terms of this Agreement. CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term. G. Drone Liability Insurance If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of One Million Dollars ($1,000,000) written by an insurer authorized to do business in California and having a current A.M. Best rating of not less than A-:VII, or otherwise acceptable to OC SAN. Coverage shall specifically include commercial UAS/drone operations and shall be maintained in a form acceptable by OC SAN. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 10 of 20 H. Proof of Coverage The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before work commences. Upon request, CONSULTANT shall provide certified copies of applicable insurance policies and endorsements evidencing the coverage required under this Agreement, subject to redaction of confidential or proprietary information not relevant to such coverage. The following are approved forms that must be submitted as proof of coverage: •insurance form • (General Liability) CG 20 10 and CG 20 37 All other additional insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN. • (Automobile Liability) OC SAN approval. •subrogation endorsement provided by carrier for OC SAN approval. • Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below. I. Cancellation and Policy Change Notice The CONSULTANT is required to notify OC SAN in writing of any insurance cancellation notice it receives or other knowledge of pending or actual insurance policy cancellation within two (2) working days of receipt of such notice or acquisition of such knowledge. Additionally, the CONSULTANT is required to notify OC SAN in writing of any change in the terms of insurance, including reduction in coverage or increase in deductible/SIR, within two (2) working days of receipt of such notice or knowledge of same. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 11 of 20 Said notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Contracts, Purchasing & Materials Management Division J. Primary Insurance The general and automobile liability policies shall contain a “Primary and Non-Contributory” clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT. K. Separation of Insured The general and automobile liability policies shall contain a “Separation of Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this Agreement, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property. M. Deductibles and Self-Insured Retentions Any deductible and/or self-insured retention must be declared to OC SAN on the certificate of insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses. N. Defense Costs The general and automobile liability policies shall have a provision that reasonable defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits. O. Subconsultants The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 12 of 20 P. Limits Are Minimums The insurance limits specified in this Agreement are minimum requirements only and shall not limit the liability of the CONSULTANT. If a claim or incident arising out of the CONSULTANT’s performance under this Agreement exceeds the minimum required insurance limits, CONSULTANT shall remain fully responsible for all amounts in excess of such minimum required limits, up to the full extent of CONSULTANT’s liability under this Agreement. 12. KEY POSITIONS CONSULTANT shall notify OC SAN in advance changes to any key CONSULTANT employees or Subconsultants performing services under this Agreement. Positions considered to be Key Positions are Point of Contact, and any field office staff working under the Agreement. Should a CONSULTANT employee or Subconsultant within one of these categories become no longer available to OC SAN, CONSULTANT shall submit the resume and qualifications of the proposed replacement to OC SAN for approval as soon as possible, but in no event later than seven (7) calendar days prior to the departure of the incumbent Key Position unless CONSULTANT is not provided with such notice by the departing staff. 13. SCOPE CHANGES In the event of a change in the Scope of Work or a change in Key Personnel or change in hourly rates as requested by OC SAN, the Parties hereto shall execute an Amendment to this Agreement setting forth with particularity all terms of the new Agreement. CONSULTANT’s compensation for additional services authorized and performed in accordance with this Agreement shall be agreed to by the Parties in writing prior to the time that the additional services are authorized. CONSULTANT hereby agrees to use any and all procedures, programs, and systems required by OC SAN to process and execute such Amendment(s), including, but not limited to, computer programs and systems. 14. PROJECT TEAM AND SUBCONSULTANTS Neither this Agreement nor any interest herein nor claim hereunder may be assigned by CONSULTANT either voluntarily or by operation of law, nor may all or any part of the Agreement be subcontracted by CONSULTANT, without the prior written consent of OC SAN. Consent by OC SAN shall not be deemed to relieve CONSULTANT of its obligation to comply fully with all terms and conditions of this Agreement. CONSULTANT shall provide to OC SAN, prior to execution of this Agreement, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used under this Agreement by CONSULTANT. CONSULTANT shall include a description of the work and services to be done by each Subconsultant and each of CONSULTANT’s team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant, broken down as indicated in Section 2- COMPENSATION. There shall be no substitution of the listed Subconsultants and CONSULTANT’s team members without prior written approval by OC SAN. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 13 of 20 15. ENGINEERING REGISTRATION The CONSULTANT's personnel and Subconsultants are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered engineer but represents and agrees that wherever, in the performance of this Agreement, the services of a registered engineer is required, such services hereunder will be performed under the direct supervision of registered engineers who are registered in California. 16. AUDIT PROVISIONS A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents, and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this Agreement. The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this Agreement during the term of this Agreement and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all accounting records and documents, and any other financial data related to this Agreement. 17. LEGAL RELATIONSHIP BETWEEN PARTIES The legal relationship between the Parties hereto is that of an independent contractor and nothing herein shall be deemed to transform CONSULTANT, its staff, independent contractors, or Subconsultants into employees of OC SAN. CONSULTANT’S staff performing services under the Agreement shall at all times be employees and/or independent contractors of CONSULTANT. CONSULTANT shall monitor and control its staff and pay wages, salaries, and other amounts due directly to its staff in connection with the Agreement, as described in Attachment “A1” – Rules of Engagement. CONSULTANT shall be responsible for hiring, review, and termination of its staff and shall be accountable for all reports and obligations respecting them, such as social security, income tax withholding, unemployment compensation, workers’ compensation and similar matters. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 14 of 20 18. NOTICES All notices hereunder and communications regarding the interpretation of the terms of this Agreement, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return receipt requested, postage prepaid. Notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Diane Marzano, Principal Contracts Administrator Copy: Martin Dix, Engineering Manager Notices shall be mailed to CONSULTANT at: JACOBS PROJECT MANAGEMENT CO. 2600 Michelson Drive, Suite 500 Irvine, CA 92612 Attention: Anni Larkins All communication regarding the Scope of Work, will be addressed to the Engineering Manager. Direction from other OC SAN staff must be approved in writing by OC SAN’s Engineering Manager prior to action from the CONSULTANT. 19. TERMINATION OC SAN may terminate this Agreement at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination, CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination. CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this Agreement, when the same are due. Notice of termination shall be mailed to OC SAN at the address listed in Section 18 - NOTICES. 20. DOCUMENTS AND STUDY MATERIALS The documents and study materials for this Project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, electronic materials, computation and study materials in its files pertaining to the work described in this Agreement, which is requested in writing by OC SAN. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 15 of 20 21. COMPLIANCE A. Labor CONSULTANT certifies by the execution of this Agreement that it pays employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all Federal, state and local directives and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment. B. Air Pollution CONSULTANT and its subconsultants and subcontractors shall comply with all applicable Federal, state, and local air pollution control laws and regulations. C. Iran Contracting Act CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208). D. California Air Resources Board Mobile Source Regulations CONSULTANT and its subconsultants and subcontractors shall comply with the following California Air Resources Board Mobile Source Regulations: • Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6 • Truck & Bus Regulation (T&B): 13 CCR 2025 • Clean Truck Check (CTC): 13 CCR 2195-2199.1 • Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2 E. California Voluntary Protection Program Annual Reporting Requirement If CONSULTANT will potentially work 1,000 combined hours in a quarter, for the term of the Agreement, CONSULTANT shall provide an annual report detailing its safety and health information, including, but not limited to, its total number of employees, work hours, number of injuries and illnesses, and number of injury and illness cases involving days away from work, restricted work activity and/or job transfer. CONSULTANT shall furnish this report to OC SAN no later than January 20th each calendar year. Failure to provide this data by the required due date may result in suspension of CONSULTANT’s services with OC SAN. Any delay arising out of or resulting from such suspension shall be CONSULTANT’s sole responsibility and considered CONSULTANT caused delay, which shall not be compensable by OC SAN. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 16 of 20 22. AGREEMENT EXECUTION AUTHORIZATION Both Parties do covenant that each individual executing this document by and on behalf of each Party is a person duly authorized to execute this Agreement for that Party. 23. DISPUTE RESOLUTION In the event of a dispute arising between the Parties regarding performance or interpretation of this Agreement, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services. 24. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which he may be entitled. 25. INDEMNIFICATION To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN, which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, consultants, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and OC SAN’s general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in carrying out its obligations under this Agreement to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, consultants, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from: (A) the active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or (C) the independent action of a third party who is neither one of the Indemnified Parties nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them. CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 17 of 20 CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the provisions of this Agreement. Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this Agreement are contractual and the result of negotiation between the parties hereto. Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting Party, shall not be employed in the interpretation of this Agreement. CONSULTANT is indemnified in OC SAN’s standard construction contracts. This indemnification is in the General Conditions which are attached to OC SAN’s standard construction contracts when these contracts are issued. 26. DUTY TO DEFEND The duty to defend hereunder is wholly independent of and separate from the duty to indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims. CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this Agreement until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 27. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES CONSULTANT shall comply with all OC SAN policies and procedures, including, but not limited to, the Contractor Safety Standards, as applicable, and Human Resources Policies, all as may be amended from time to time. 28. CLOSEOUT When OC SAN determines that all work authorized under the Agreement is fully complete and that OC SAN requires no further work from CONSULTANT, or the Agreement is otherwise terminated or expires in accordance with the terms of the Agreement, OC SAN shall give the CONSULTANT written notice that the Agreement will be closed out. CONSULTANT shall submit all outstanding billings, work submittals, deliverables, reports or similarly related documents as required under the Agreement within thirty (30) days of receipt of notice of Agreement closeout. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 18 of 20 Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the Agreement and will either: i. Give the CONSULTANT a final Agreement Acceptance: or ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in the Agreement. Such support must be provided within the timeframe requested by OC SAN. Notwithstanding the final Agreement acceptance, the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise), and the CONSULTANT shall remain obligated under all those provisions of the Agreement which expressly or by their nature extend beyond and survive final Agreement Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final Agreement Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or Agreement with, the CONSULTANT’s request for final Agreement Acceptance. 29. PROHIBITION During the term of this Agreement, CONSULTANT and its Subconsultants may not propose on any engineering or construction-related projects advertised by or on behalf of OC SAN if such work presents actual or perceived conflict of interest with CONSULTANT’s assignments with OC SAN. CONSULTANT and its Subconsultants shall promptly disclose to OC SAN when such conflict exists prior to participating in any work as advertised by OC SAN or on its behalf. CONSULTANT and its Subconsultants acknowledge and agree that OC SAN’s determination regarding such conflicts that may impact CONSULTANT’s and its Subconsultants’ ability to propose on the work as described herein shall be final and cannot be appealed. 30. ENTIRE AGREEMENT This Agreement constitutes the entire understanding and agreement between the Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof. PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 19 of 20 IN WITNESS WHEREOF, this Agreement has been executed in the name of OC SAN and CONSULTANT by their respective duly authorized officers as of the day and year first written above. CONSULTANT: JACOBS PROJECT MANAGEMENT CO. By _______________________________ _________________ Date __________________________________________________ Printed Name & Title ORANGE COUNTY SANITATION DISTRICT By _______________________________ _________________ Christine Marick Date Board Vice-Chairwoman By _______________________________ _________________ Kelly A. Lore Date Clerk of the Board By _______________________________ _________________ Kevin Work Date Purchasing & Contracts Manager Attachments: Attachment “A” – Scope of Work Attachment “A1” – Rules of Engagement Attachment “B” – Not Used Attachment “C” – Not Attached Attachment “D” – Allowable Direct Costs Attachment “E” – Fee Proposal Attachment “F” – Not Used Attachment “G” – Not Attached Attachment “H” – Not Used Attachment “I” – Not Used PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 20 of 20 Attachment “J” – Not Attached Attachment “K” – Not Used Attachment “L” – Contractor Safety Standards Attachment “M” – Not Attached Attachment “N” – Not Attached Attachment “O” – Not Attached Attachment “P” – Human Resources Policies DM:ms ATTACHMENT “A” SCOPE OF WORK SCOPE OF WORK PSA2026-001 Page 1 of 12 ATTACHMENT "A" SCOPE OF WORK I. SUMMARY The Orange County Sanitation District (OC SAN) is a special district responsible for wastewater conveyance and treatment for Northern and Central Orange County, California. OC SAN is a public agency that operates one of the largest wastewater facilities in the United States of America. OC SAN is soliciting Proposals to provide Supplemental Engineering Services to support its engineering projects, which includes large and small capital projects and operationally funded repair projects. II. BACKGROUND OC SAN has budgeted for a 10-year $3.6 billion capital improvement program, the vast majority of which is managed by the Engineering Department. OC SAN also has an active asset management program which includes many repair projects that, due to their complexity, are managed by its Engineering Department. III. PROFESSIONAL SERVICES REQUIRED The following descriptions cover the types of professional services OC SAN will require under this Agreement. OC SAN will determine when specific services are required. The mechanisms for requesting, reviewing, authorizing, and terminating services under this Agreement are documented in Attachment "A1" - Rules of Engagement. As described in that attachment, work assignments will fall into one of the following types: • Task Authorizations. Task Authorizations have formal Scope of Work and the CONSULTANT submits a proposal with a fee. • Task Directives. Task Directives are typically smaller than Task Authorizations where OC SAN provides a scope and a not-to-exceed fee amount that will be negotiated with the CONSULTANT. • Program Role Assignments. In Program Role Assignments, the CONSULTANT shall provide an appropriately qualified and experienced professional to fulfill the project role on a portfolio of projects. OC SAN will authorize specific tasks to be completed by the CONSULTANT and will require the CONSULTANT to provide staff to fill designated roles on specific projects or within the Engineering Program, as described in Attachment “A1” – Rules of Engagement. SCOPE OF WORK PSA2026-001 Page 2 of 12 IV. ENGINEERING DEPARTMENT ROLES AND RESPONSIBILITIES Architecture Design and oversee design by CONSULTANT’s of new building and tenant improvement projects. Work with City Building/Planning Departments, Fire Departments, and other regulatory agencies as a liaison on behalf of OC SAN to confirm projects comply with permitting and code requirements. Prepare more complex plan clarifications and changes in response to Contractor's request for information during construction and verify that facilities constructed meet design specifications and regulatory requirements. Engineering - Construction Management Construction management activities include the following: • Perform a variety of work functions supporting the design and construction of wastewater treatment and collection systems. • Review construction documents including plans and specifications; interpret plans and specifications for construction work performed by OC SAN's Contractors; review submittals for material and equipment conformance to design specifications and plans; ensure contractual compliance with plans, specifications, codes, and safety requirements; verify that materials being incorporated into project are per specification and with approved construction practices; and coordinate equipment isolations, shutdowns, and equipment and process tie-ins. • Prepare progress payments to the Contractor. • Perform analysis of change orders; negotiate fair and reasonable costs for change orders; and prepare change order documentation. • Oversee the start-up of facilities and schedule staff training. • Provide technical assistance and support to engineers and project managers. • Prepare a variety of administrative and technical memos, letters, and correspondence. • Perform constructability reviews. • Maintain comprehensive contractual records and periodically monitor progress of all goods and service agreements from inception through completion to enforce milestones, deliverables, and post-contract warranties. Engineering - Civil / Mechanical Prepare CONSULTANT Scope of Work. Review proposals and assist OC SAN in the CONSULTANTS’ selection process. SCOPE OF WORK PSA2026-001 Page 3 of 12 Design or oversee design by CONSULTANT’s of sanitary sewers, sewer rehabilitation, mechanical piping systems, wastewater treatment systems, reclaimed water systems, lift stations, etc. including calculations. Lead design reviews to perform a comprehensive multi- discipline design review on assigned projects. Prepare detailed drawings, technical specifications, and calculations for in-house designs on small projects. Respond to engineering bid questions and addenda. Perform construction support services, respond to Contractor's request for information, review construction submittals and verify that equipment meets design specifications, prepare design changes, review Contractor’s requested design changes, and support startup and commissioning. Engineering - Electrical Provide electrical engineering services including design, design review, interdisciplinary review of design documents, and construction support service for collections and wastewater treatment plant facilities. Design and oversee design by CONSULTANT’s for medium voltage and low voltage electrical distribution systems including switchgear, motor control centers and standby power. Design includes single line diagrams, elementary diagrams, motor control schematics, short circuit calculations, protective device coordination studies, raceway/wire design, and hazardous area classification. Perform construction support services, respond to Contractor's request for information, review construction submittals and verify that equipment meets design specifications, prepare design changes, review Contractor’s requested design changes, review InterNational Electrical Testing Association (NETA) test results, and perform electrical system startup and commissioning for standby power and low and medium-voltage systems. Perform short circuit calculations and protective device coordination studies utilizing Electrical Transient Analyzer Program (ETAP) software. Engineering - Instrumentation and Control Provide instrumentation and control engineering services including design, design review, interdisciplinary review of design documents, construction support service, and commissioning support for collections and wastewater treatment plant control systems. Design and oversee design by CONSULTANT’s for process and instrumentation diagrams, control strategies, control system network diagrams, control system input/output lists, control panel drawings, and commissioning procedures. Perform construction support services, respond to Contractor's request for information, review construction submittals and verify that equipment meets design specifications, prepare design changes, review Contractor’s requested design changes, and support startup and commissioning. SCOPE OF WORK PSA2026-001 Page 4 of 12 Engineering - Commissioning Coordinator Provide technical leadership and management of the development of commissioning procedures during design; review the proposed construction sequencing and commissioning packages established during design; review finalized commissioning procedures during construction; work closely and coordinate with the Contractor's commissioning coordinator; provide oversight of the Contractor's commissioning and start-up process and coordinate startups with operations and maintenance; coordinate OC SAN's inspection, control system programming, and engineering resources to support the Contractor's commissioning process; track outstanding commissioning items and support their resolution and work closely with the Resident Engineer to provide commissioning status and notification of any issues or concerns. The commissioning coordinator shall have knowledge in electrical, instrumentation, control systems, and process control. Engineering - Structural Provide structural analysis as needed to recommend structural improvements to existing facilities, analyze structural failures, and recommend repairs. Design and oversee design by CONSULTANT’s of structural systems for collections and wastewater facilities. Review proposals, technical memoranda, and designs prepared by others and prepare engineering analysis. Prepare detailed drawings, technical specifications, and calculations for in-house designs on small projects. Perform construction support services, respond to Contractor’s requests for information, review construction submittals and verify that equipment meets design specifications and regulatory requirements, prepare more complex structural engineering design changes during construction and review Contractor’s requested design changes. Inspection Various disciplines may need continuous construction inspection including Civil, Structural, Pipeline, Mechanical, Electrical, and Instrumentation for rehabilitation and replacement of collections and wastewater treatment plant facilities. Inspection activities include the following: • Provide construction inspection for plant and collection facilities construction work performed by Contractors to confirm contractual compliance with plans, specifications, codes, regulations, and OC SAN's safety standards. • Prepare a variety of reports and documentation. • Review construction documents including plans and specifications. • Review construction submittals. • Inspect plant and collection facilities construction work performed by Contractors. SCOPE OF WORK PSA2026-001 Page 5 of 12 • Verify that materials being incorporated into project are per specification and with approved construction practices. • Coordinate equipment and process isolations, shutdowns, and tie-ins. • Assist safety representatives with job hazard analysis. • Observe Contractors work safety environment and compliance with OC SAN's safety standards, Cal/OSHA, regulations, and traffic control requirements and work with Contractor to establish and maintain a safe construction project for employees, customers, and the public. • Document and follow-up on actions regarding safety, traffic control plans, and working practices. • Assist in the maintenance of accurate as-built contract drawings. • Verify Contractor as-built drawings are maintained and correct. • Assist Resident Engineers on requests for information, field change orders, plan clarifications, and plan changes. • Review and approve final drawings for the preparation of record drawings. • Prepare and maintain necessary construction inspection records and reports as a means of formal documentation including daily inspection reports, photo-logs, field test results, force account reports, extra work requests, project submittal files, and individual project logs. • Assist Resident Engineer in reviewing the Contractor’s monthly progress invoices. • Attend construction meetings. • Participate in commissioning. • Perform field walks and develop punch lists. • Work with Contractors, regulatory agencies, utilities, city officials, and the general public throughout the construction project to coordinate work to be accomplished and ensure the project is completed successfully with minimum impact on the public or OC SAN facilities. Project Management Project management functions for major capital projects include developing schedules, cost estimates, and staffing requirements; assembling and leading project teams; planning, directing, and coordinating activities of projects to confirm that goals and objectives of projects are accomplished on schedule and within prescribed budget; inspecting quality and quantity of work; managing the selection of outside CONSULTANT’s; and preparing and presenting reports and other necessary correspondence on assigned projects. SCOPE OF WORK PSA2026-001 Page 6 of 12 Manage a project or group of projects through all six phases of the Engineering Project Life Cycle including project development, preliminary design, design, construction and installation, commissioning, and closeout. Manage, direct, and coordinate activities of the project team to confirm the project progresses on schedule within prescribed budget and with acceptable quality. Confer with project team to provide technical advice and resolve problems and conduct project team meetings to confirm adequate communication of project status. Perform periodic review of assigned work to confirm that the work is satisfactory and is completed according to plan. Interface with senior management, peers, project staff, CONSULTANT’s, customers, and users as necessary to coordinate project execution and inform stakeholders of project status and possible outcomes. Prepare project reports for the Board of Directors, management, and others and make presentations as necessary. Provide project management oversight of the selection process of outside CONSULTANT’s; oversee the bid, proposal, and selection/purchase recommendation process for major capital projects; solicit proposals; review proposals; assist OC SAN's evaluation teams with selection of CONSULTANT’s; negotiate the fee; and establish schedules and performance criteria. Work with CONSULTANT’s on project planning, preparation, scheduling, and execution of contracts and ensure work is completed on time and in conformance with plans and specifications. Apply project management tools as required to address the financial aspects and impacts of project variables such as delays to the project schedule and changes to the project scope. Serve as a liaison for the Engineering Department with other OC SAN departments, divisions, and outside agencies and provide project representation to commissions, committees, and task forces. Support - Administrative Administrative support activities include the following: • Perform a variety of secretarial, advanced clerical, and routine administrative and programmatic work in support of assigned projects or programs, division, or department. • Participate in the administration of approved policies and procedures. • Prepare financial analysis and a variety of reports as required. • Provide information and assistance to other assigned project or program staff regarding assigned programs, policies, and procedures. SCOPE OF WORK PSA2026-001 Page 7 of 12 Support - Submittals Submittals support activities include the following: • Coordinates the submittal review process between Contractors and OC SAN staff. • Reviews submittals to determine compliance with the submittal submission processes. • Consolidates submittal comments for final review. • Finalizes and distributes facilities records. Support - Cost Estimating Cost estimating activities include the following: • Prepare cost estimates to provide detailed information regarding quantity and cost of materials and labor. • Develop processes and/or techniques that provide clear and standard estimating methods across projects. • Provide data for analytical comparisons between projects. • Review project cost estimates as projects advance through the design process. • Review engineering plans and specifications to determine materials and quantities required by project specifications. • Recommend cost saving changes. • Review cost estimates and change orders submitted by construction Contractors and provide recommendations. • Prepare general budget estimates for new projects. Estimating shall include all disciplines including architectural, civil, structural, mechanical, plumbing, heating and air conditioning, fire protection, electrical, and control systems. Support - Construction Scheduling Perform a variety of scheduling reviews and analyses involving wastewater treatment and collection systems, including the following activities: • Review design submittals prior to bid to confirm scope is achievable in the time stipulated. • Establish clear specifications and enforcement provisions with the Contractors by placing schedule performance and proof of impact on the Contractors. • Review construction Contractor's schedules for effective Contractor performance. Identify changes to the critical path. • Review baseline schedule submittals. SCOPE OF WORK PSA2026-001 Page 8 of 12 • Support the Resident Engineer and Project Manager during scheduling meetings so they are effective and productive. • Maintain careful documentation of all schedule submittals so that any requests for time adjustments can be measured against the approved schedule in place at the time of impact is claimed. • Monitor actual progress versus planned progress. Provide exception reporting and recommend actions. • Perform analysis of change orders such as time impact analysis (TIA) and productivity claims. Support - Construction Claims / Mitigation Prepare detailed analysis of Contractor-submitted requests for change, delay claims, TIAs, and/or government code claims including productivity loss claims, claims for differing site conditions, and/or total cost claims. Work may include analysis of liability, review of contract language and supporting documents, validating extended overhead costs, and review and analysis of any other supporting documentation. Work may also include a proactive strategy to reduce exposure, review of reporting requirements and practices, and conferring with project teams and/or managers to effectively implement practices to reduce liability and/or risk. Support - Computer Aided Design Drafting and Design Computer Aided Design (CAD) drafting and design support include the following activities: • Use CAD equipment to provide support to Engineers by preparing layouts, detail drawings, sketches, and diagrams. Drawings are to include all views and dimensions necessary for construction of wastewater treatment and collection systems. Work must comply with OC SAN CAD Manual. • Draft engineering drawings of proposed wastewater treatment facility construction projects from engineer's design drawings including structures and notations and review maps and existing drawings to determine utility locations, elevations, and other related information. • Consolidate changes made on drawings by CONSULTANT’s, engineers and inspectors with Contractor's as-built drawings to draft final record drawings on a wide variety of wastewater treatment facility construction projects. • Conduct field visits to confirm existing conditions and finished construction configuration. • Make appropriate notes of sizes, diameters, locations, and other significant information and return to project engineer. • Provide technical assistance and support to engineers and engineering aides. SCOPE OF WORK PSA2026-001 Page 9 of 12 Support - Outreach Provide community and stakeholder outreach support for OC SAN projects during design and construction phases. Work may include the following activities: • Develop outreach plans, schedules, and budgets identifying project areas, community concerns, community events, demographics, and language needs. • Identify stakeholders and communication strategies, including property owners, tenants, businesses, schools, and public officials. • Plan, organize, and staff public meetings, including presentation development and meeting summaries. • Conduct door-to-door or neighborhood outreach to impacted residents and businesses. • Develop and design outreach materials such as fact sheets, notifications, press releases, website updates, and social media content consistent with OC SAN branding. • Develop and implement crisis communication plans. V. LOGISTICS AND CONTRACT MANAGEMENT Work Location CONSULTANT's on-site staff shall work from at OC SAN's facilities in Fountain Valley or Huntington Beach, California. At times, work may be required at other OC SAN facilities or at job site locations away from OC SAN facilities. At the CONSULTANT's discretion and concurrence with the OC SAN representative, the assigned CONSULTANT staff may be located at CONSULTANT's home office. Advanced coordination with OC SAN may be required for CONSULTANT staff working at OC SAN facilities on OC SAN holidays. Point of Contact/Supervision CONSULTANT shall designate an individual as the single point of contact to direct efforts in fulfilling contracted obligations under this Agreement. The selected designee shall be responsible for the direct supervision of assigned staff, including such activities as directing work, work schedules, quality of work performed, technical oversight, vacation requests, discipline, etc. The selected designee shall not be changed without prior written notification to the OC SAN representative. CONSULTANT shall be responsible for supervision of its entire staff, including the requirements defined in Attachment "A1" - Rules of Engagement. SCOPE OF WORK PSA2026-001 Page 10 of 12 OC SAN Project Document Management CONSULTANT's staff assigned to work on OC SAN projects shall save project related deliverables, documents, and/or records in OC SAN accessible locations (i.e., OC SAN SharePoint servers and/or OC SAN licensed cloud-based applications such as Bluebeam, PMWeb or One Drive) as applicable to the project assignment to comply with Public Records Act requirements. Accessibility to these locations will be provided by OC SAN. Provided Facilities & Equipment OC SAN shall provide the following for CONSULTANT's on-site staff: • Furnished office space at OC SAN • Computers, software, network, and printing capabilities • Office telephone Personal Protective Equipment CONSULTANT staff assigned to OC SAN facilities may be exposed to known plant process and work hazards and therefore shall have appropriate Personal Protective Equipment (PPE) such as: eye and face protection (safety glasses), head protection (hard hat), hand protection (gloves), foot protection (safety toed shoes), high visibility clothing (Class 3 vests), hearing protection, personal gas monitor (4 gas), fall protection (harness and lanyard), and other forms of PPE. CONSULTANT shall provide all equipment and training necessary to comply with OC SAN safety polices. Refer to Attachment "L" - Contractor Safety Standards. Time Tracking & Invoicing CONSULTANT shall submit invoices, including cost and hours, monthly. Invoice shall be submitted no later than the 15th of each month. OC SAN maintains a project controls system containing detailed cost and hours information for all Engineering Projects. The format for reporting hours shall be in an importable format such as Microsoft Excel and contain, at a minimum, the following items: Column Description Project Number OC SAN shall provide a list of project numbers. These numbers are subject to change as new projects are added, and existing projects are completed. Work Package Number OC SAN shall provide a list of work package numbers. The work package numbers are subject to change as a project transitions from one phase to the next. Employee ID Each employee included in the hours report must contain a unique identification number. Employee Name Employee name. SCOPE OF WORK PSA2026-001 Page 11 of 12 Work Date The week ending date when work was performed. Hours by Week The total number of hours worked for the week. In addition, it may be necessary to report overtime hours which will require a separate report. Total Burdened Cost The total burdened cost shall include actual salary, fringe costs, overhead, and profit by person. Work Quality CONSULTANT shall be responsible for the professional quality and technical competence of assigned staff supplied to OC SAN. Additionally, the firm shall be responsible for the coordination of all efforts and other services furnished under the Agreement. Billing Guidance The following guidance establishes which activities performed by CONSULTANT are considered billable and non-billable under this Agreement. Non-Billable Activities The following activities are not billable to OC SAN: • Proposal and staffing activities: Time spent identifying staff, preparing or submitting proposal material, or negotiating budgets is considered marketing and is not billable. • Pre-selection communications: Before OC SAN selects a firm for a request, any clarifications, questions, or discussions should be directed to the designated Submitter. CONSULTANT shall not consult directly with OC SAN staff outside of the Submitter. Any such time is non-billable. • General training: Technical training is not billable except for training specific to OC SAN requirements, procedures, or standards. • Internal performance management: Time spent addressing or documenting performance issues of assigned staff is not billable. • Other OC SAN-unrequested activities: Any tasks performed without a formal request or outside of authorized Scope of Work, task directives, or task authorizations are non- billable. Billable Activities The following activities are generally billable to OC SAN: • Preparing and submitting invoices. • Managing the CONSULTANT’s internal billing codes. • Preparing progress reports for assigned tasks. • Providing technical guidance and oversight to assigned staff. • Managing task directives and task authorizations. • Performing quality control for task directives and task authorizations. SCOPE OF WORK PSA2026-001 Page 12 of 12 • Attending regular coordination meetings with OC SAN Management. • Training CONSULTANT staff on OC SAN-specific requirements, procedures, and standards. Program-level support activities, rather than project-specific work, shall be billed to Project SP-195, Work Package 3210. Management of Resource Assignments OC SAN will maintain a cloud-based workflow tool to request, review, authorize, and close resource assignments. That workflow tool is currently PMWeb. CONSULTANT's Point of Contact shall utilize this tool to track all requests through their life cycles. OC SAN will use this workflow tool to verify that any invoiced costs have been duly approved through the workflow tool. ATTACHMENT “A1” RULES OF ENGAGEMENT Rules of Engagement PSA2026-001 Page 1 of 4 ATTACHMENT “A1” RULES OF ENGAGEMENT This document describes how OC SAN may use a Supplemental Engineering Services agreement to maintain the Engineering Project program while complying with independent Contractor classification laws. There are three mechanisms by which professional services can be supplied through the Agreement: • Task Authorizations • Task Directives • Program Role Assignments These Rules of Engagement are intended to document how services are to be requested, authorized, and managed. Task Authorizations When OC SAN requires a specific task completed, staff will contact each firm. Depending on the nature of the task, OC SAN may request that each firm respond with the proposed team, fee, and, if applicable, an approach to perform the work. Based on these responses, OC SAN will determine which firm offers the most qualified and appropriate team and/or approach and negotiate a Task Authorization with that firm. Task Authorizations have a formal Scope of Work and a fixed upper limit. Distinguishing aspects of Task Authorizations include the following: • Requests for Task Authorization Proposal (RFTAP) require a Scope of Work prepared by OC SAN staff. • RFTAPs and Task Authorizations must be approved by the Director of Engineering. • The Scope of Work must include schedule requirements, tasks, deliverables, and assumptions, similar in detail to a Design or Planning Study Task Order. • Each Task Authorization must specify a firm, negotiated upper limit which may not be exceeded. Any changes must be processed as a formal Task Authorization Amendment before the work is performed. • The CONSULTANT shall report incurred costs for the Task Authorization on their monthly invoices, including total costs to date and the remaining budget. • Time charged to Task Authorizations does not count against approved Program Role hours. Task Directives Task Directives are typically smaller than Task Authorizations where OC SAN provides a Scope of Work and a not-to-exceed fee amount that will be negotiated with the CONSULTANT. Task Directives include the following: Rules of Engagement PSA2026-001 Page 2 of 4 • The Scope of Work may be less detailed than what is required for a Task Authorization. • A schedule for completing the work should generally be specified, but it is not always required. • Task Directive must specify a firm negotiated upper limit which may not be exceeded. If changes require a revision to that upper limit, it must be processed as a formal Task Directive Amendment prior to the work being authorized and performed. • CONSULTANT shall report costs incurred for the Task Directive on their monthly invoices, including total costs to date and the remaining budget. Program Role Assignments Program Role assignments direct the CONSULTANT to assign a qualified individual to fill a specific role across multiple projects. For inspection staff, where assignments and timing may vary from day to day to support the workload demand with construction projects, the CONSULTANT shall designate a dispatcher who coordinates assignments and schedules with OC SAN’s Inspection Supervisor. The dispatcher may be the CONSULTANT’s Point of Contact, an assigned inspector, or another appropriate representative. Requirement for Program Roles: • OC SAN will contact all firms eligible to provide professionals for the role. • Assignment, duration, and budget: o They are specific to one person. o Assignments will generally be made before the specific need arises. o Hours and costs will be tracked at the Program Role, project, and work package level. An authorized budget will be established based on the individual’s burdened rate and the duration of the assignment. The individual’s location (Home Office or Site) impacts the billing overhead rate. The burdened rate includes salary, overhead, and profit. Reimbursable expenses, typical for travel or vehicle use, will also be tracked. o They are assigned for a specified duration. At the end of the specified duration, the Program Role will either be closed or renewed. o On-site Program Roles will be provided office space, key cards, an OC SAN phone extension, an OC SAN email, and network access. • Selection factors: The assignment will go to the firm that offers the professional who is the best fit for the Program Role. Depending on the role, OC SAN may consider: o Relevant experience and expertise. o Availability to begin work (for example, full-time availability if the role starts immediately). o On-site presence and proximity to OC SAN facilities. o Cost-effectiveness when multiple qualified candidates are available. Rules of Engagement PSA2026-001 Page 3 of 4 • The Engineering Manager responsible for the function must approve Program Role assignments. Only supervisors or managers may initiate Program Role requests. Project assignments are made under the Program Role to direct the CONSULTANT to assign qualified individuals to specific projects. A project assignment may cover the full project role or a defined portion. Standard project assignments are listed below: • Administrative Support • Construction Scheduling • Electrical Engineer • Cost Estimator • Outreach Support • Instrumentation and Control (I&C) Engineer • Commissioning Coordinator • Inspection - Civil/Mechanical • Inspection - Electrical/I&C • Project Engineer • Project Manager • Resident Engineer • Submittals • Project Support (structural, HVAC, constructability, etc.) Requirements for project assignments: • Assignments will be made from existing Program Role assignments. • Timing and duration depend on the project schedule or other designations. • CONSULTANT assigned to a project will work directly with OC SAN or project team members. • Assignment requests must specify total estimated hours. • CONSULTANT shall identify a Technical Lead to support assigned CONSULTANT staff. • Project direction will come from the CONSULTANT Point of Contact or CONSULTANT Supervision, in coordination with OC SAN Project Team and Supervision in Engineering. CONSULTANT Staff Supervision CONSULTANT is responsible for supervision of its entire staff, including the following: • Administrative Supervision (CONSULTANT staff only) o Performance reviews o Timecard approvals o Work hours • Supervision of assigned roles Rules of Engagement PSA2026-001 Page 4 of 4 o Work prioritization o Technical input, guidance, and direction o Quality Control for assigned deliverables OC SAN does not supervise CONSULTANT staff. However, OC SAN provides direction to CONSULTANT as an Owner, including: • Project decisions and priorities • Design standards • OC SAN preferences • Financial and risk considerations • Compliance with OC SAN Policies and Procedures • Coordination with other OC SAN projects and activities 6/23/2026 1 Supplemental Engineering Services, Contract No. PSA2026-001 Presented by: Martin Dix Engineering Manager Operations Committee July 1, 2026 2 Supplemental Engineering Services (SES) Provides flexibility and engineering services to: Deliver the CIP Project management, project engineering, resident engineering, inspection and construction support Fill gaps and peaks Support workload surges, temporary vacancies, and transition periods Add expertise Constructability, value engineering, structural, estimating, scheduling, claims, outreach 1 2 6/23/2026 2 2002- 2012 2012- 2017 2017- 2022 2022- 2027 2026- 2031 SES History 3 2002- 2012 2012- 2017 2017- 2022 2022- 2027 2026- 2031 SES History 4 $59.4M 3 4 6/23/2026 3 2002- 2012 2012- 2017 2017- 2022 2022- 2027 2026- 2031 SES History 5 $59.4M $55.8M $0 $50 $100 $150 $200 $250 $300 0 10 20 30 40 50 60 FY12-13 FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-25 AECOM Enterprise Automation Jacobs Rockwell Automation CIP Cash Flow SES Staffing Levels 6 # o f s t a f f Mil l i o n s 5 6 6/23/2026 4 $- $100 $200 $300 $400 $500 $600 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 44-45 45-46 Mi l l i o n s Fiscal Year Adopted 3.5% Esc Ref Line 7 20-Year Spending: $8.3B 8 72 72 72 72 72 72 72 2 12 23 30 33 33 33 54 45 32 28 19 28 20 128 129 127 130 124 133 125 0 20 40 60 80 100 120 140 25-26 26-27 27-28 28-29 29-30 30-31 31-32 St a f f C o u n t Fiscal Year OC San Base Staffing New OC San Staffing Required SES Staffing SES + New Staff Required SES Staffing 7 8 6/23/2026 5 9 72 72 72 72 72 72 72 2 12 23 30 33 33 33 54 45 32 28 19 28 20 128 129 127 130 124 133 125 0 20 40 60 80 100 120 140 25-26 26-27 27-28 28-29 29-30 30-31 31-32 St a f f C o u n t Fiscal Year OC San Base Staffing New OC San Staffing Required SES Staffing SES + New Staff Required SES Staffing 10 Selection Process Key Attributes—Jacobs •Exceptional staff •Effective approach for managing resource requests •Highly effective on current contract Key Attributes—AECOM •Deep bench of professionals •Experience with similar contracts •Good approach for staff supervision Proposal ScoreFirm 95Jacobs Project Management Co. 78AECOM Technical Services, Inc. 70Hazen and Sawyer 9 10 6/23/2026 6 Recommend to the Board of Directors to: A. Approve Professional Services Agreements to provide SupplementalEngineering Services, Contract No. PSA2026-001, for a three-year periodwith two one-year renewal options, for a combined total amount not toexceed $55,800,000, initially allocated as follows: •AECOM Technical Services, Inc. – $27,900,000 •Jacobs Project Management Co. – $27,900,000; and B. Authorize the General Manager to transfer funds between the twoProfessional Services Agreements, as needed, to align contract budgets with actual workload distribution, with no increase to the total Board-authorized amount. Recommendation 11 11 ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5015 Agenda Date:7/22/2026 Agenda Item No:10. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: RENEW NUTANIX SOFTWARE SUBSCRIPTION, SPECIFICATION NO. S-2026-731BD GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Purchase Order Contract to Saitech Inc. for the Purchase of Nutanix Software, Specification No. S-2026-731BD, for a total amount not to exceed $428,173; and B. Approve a contingency of $42,817 (10%). BACKGROUND Nutanix is a solution that consolidates computing and storage on the same physical hardware.It has been used to host infrastructure systems for both Office and Industrial Control Systems (ICS) computing environments. The current software subscription for the ICS environment will expire in August 2026.This renewal is for the ICS environment only,for a period of one (1)year,to allow us to transition to a different platform. RELEVANT STANDARDS ·24/7/365 treatment plant reliability ·Ensure the public’s money is wisely spent ·Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard ·Protect OC San assets PROBLEM The current Nutanix Software Subscription expires in August 2026.A lapse in coverage could impact the ICS computing environment. Orange County Sanitation District Printed on 7/13/2026Page 1 of 3 powered by Legistar™ File #:2026-5015 Agenda Date:7/22/2026 Agenda Item No:10. PROPOSED SOLUTION Renew the Nutanix Software Subscription for the Industrial Control Systems (ICS) Environment. TIMING CONCERNS Renewing the Nutanix Software Subscription is imperative for the uninterrupted support and safety of plant operations. RAMIFICATIONS OF NOT TAKING ACTION A decision not to renew Nutanix Software Subscription would mean the solution would no longer be supported, security patches could not be applied, and the product could not be used legally. PRIOR COMMITTEE/BOARD ACTIONS March 2022 -Approved a Purchase Order to ePlus Technology,Inc.for the purchase of software, hardware,and services to implement and configure the Nutanix metro clusters for Plant No.1 Industrial Control System,Specification No.E-2022-1300BD,for a total amount not to exceed $560,195,plus applicable sales tax and shipping;and approved a contingency in the amount of $56,019 (10%). July 2021 -Approved a Purchase Order to ePlus Technology Inc.for Specification No.E-2021- 1253BD for IT Server Hardware for Outfall Low Flow Pump Station,Contract No.J-117B,for a total amount of $793,882.96, plus applicable sales tax and freight. ADDITIONAL INFORMATION An invitation for bids was issued on May 7,2026,via OpenGov.Bids were due on June 1,2026.OC San received four (4) bids, which are valid for 180 calendar days from the bid opening date. The following is a list of the firms who submitted a bid: Company Name Bid Determination Saitech Inc $428,172.80 Responsive / Responsible ePlus Technology $431,474.56 Responsive / Responsible Questivity $441,774.08 Responsive / Responsible Rigel Networks LLC $563,200.00 Non-Responsive / Non-Responsible A requirement of this Invitation for Bids was that vendors be authorized Nutanix resellers.Rigel Networks LLC was determined not to meet this requirement. Based on these results,staff recommends approving a Purchase Order Contract with Saitech Inc. The term of this Purchase Order Contract will begin upon effective date of the Notice to Proceed. Orange County Sanitation District Printed on 7/13/2026Page 2 of 3 powered by Legistar™ File #:2026-5015 Agenda Date:7/22/2026 Agenda Item No:10. CEQA N/A FINANCIAL CONSIDERATIONS This request complies with the authority levels of the Orange County Sanitation District's Purchasing Ordinance.This item has been budgeted (FY 2026-27 &2027-28 Budget,Section 6,Page 24, Repairs & Maintenance) and the budget is sufficient for the recommended action. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: N/A Orange County Sanitation District Printed on 7/13/2026Page 3 of 3 powered by Legistar™ ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11. FROM:Robert Thompson, General Manager Originator: Laura Maravilla, Director of Human Resources SUBJECT: 2027 BENEFITS INSURANCE RENEWAL GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve the Orange County Sanitation District 2027 Benefits Insurance Renewal with the carriers listed below for an overall not-to-exceed amount of $21,321,535 as specified below: 1.Benefit Coordinators Company (BCC) (medical, dental, vision plans, and Employee Assistance Program [EAP]) - Not to Exceed $18,721,669; 2.Lincoln Financial (basic life, short- and long-term disability) - Not to Exceed $551,619; 3.Lincoln Financial (EMT & Manager disability) - Not to Exceed $36,000; 4.HealthEquity (Health Savings Accounts [HSA]) - Not to Exceed $55,386; 5.Voya (Health Reimbursement Arrangement [HRA]) - Not to Exceed $217,980; 6.WEX (Flexible Spending Accounts [FSA]) - Not to Exceed $11,606; 7.BCC (retiree-paid health premiums, recouped from retirees through monthly payments) - Not to Exceed $711,964; 8.Approve a contingency of $1,015,311 (5%); and B. Authorize the General Manager to revise the carriers within the not-to-exceed amounts listed above for operational efficiency and/or to better meet the needs of the Orange County Sanitation District and participants. BACKGROUND The Orange County Sanitation District (OC San)provides healthcare and welfare insurance benefits (plans)to employees and eligible dependents in accordance with collective bargaining agreements, personnel policies and adopted resolutions. OC San’s benefit plans are renewed annually on January 1.Human Resources (HR)manages OC San’s benefits program.OC San’s benefits broker,Alliant,evaluates market conditions,negotiates with insurance carriers,and secures the most cost-effective coverage for participants.The planning Orange County Sanitation District Printed on 7/13/2026Page 1 of 5 powered by Legistar™ File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11. process starts in April and insurance contracts are finalized and signed in August. The total cost of insurance coverage for the 2027 Plan Year will be $20,306,224,an overall increase of $1,850,634 or 10%.By comparison,annual increases were 10.5%in 2024,4.4%in 2025,and 12.8% in 2026. This year’s renewal costs are being driven by several industry-wide factors, including: ·Increased use of advanced medical technologies and treatment options ·Growth in specialty pharmaceuticals, including cancer therapies and GLP-1 medications ·Rising rates of chronic health conditions and obesity, resulting in greater healthcare utilization ·Increasing high-cost claims and medical inflation Despite these market pressures,OC San continues to implement strategies to manage healthcare costs.These efforts include participation in the Public Risk Innovation,Solutions,and Management (PRISM)insurance risk pool,ongoing review of utilization trends,plan design changes,bundled insurance coverages,and competitively shopping options and negotiating rate guarantees.In response to rising medical costs,PRISM’s Board has explored and proactively examined multiple cost-containment strategies and remains committed to monitoring evolving research,market trends, and best practices to support long-term sustainability of member agencies’ health plans. Since joining PRISM in 2015,OC San has benefited from favorable insurance renewal results.From 2017 through 2026,average annual renewal increases were 4.33%for Kaiser plans,4.36%for Anthem HMO plans,and 3.52%for Anthem PPO/HDHP plans.The overall average increase for the PRISM pool during this period was 5.64%. Employees share in the cost of medical and dental insurance in accordance with current collective bargaining agreements.For medical insurance coverage,employees contribute 20%of the premium costs,with the exception of those enrolled in employee only HMO coverage who contribute 10%of the premium cost.OC San covers the cost of all other lines of coverage including vision,basic life, disability, EAP, HAS, and HRA. Retirees may continue OC San medical and/or dental coverage by paying 100%of applicable premiums.OC San incorporates the cost of this item in the insurance renewal costs,as it is paid in advance, and reimbursed by the retiree through monthly payments. A legacy retiree medical benefit remains in place for employees hired before July 1,1988,providing 2.5 months of OC San-paid medical insurance for each year of continuous service upon retirement. Currently, 5 retirees receive this benefit, and no active employees are eligible to qualify in the future. RELEVANT STANDARDS ·Offer competitive compensation and benefits ·Comply with OC San Policy 4.1 - Insurance PROBLEM OC San has a contractual obligation to provide health and welfare benefits to employees and eligible Orange County Sanitation District Printed on 7/13/2026Page 2 of 5 powered by Legistar™ File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11. dependents. Current insurance coverage expires December 31, 2026. PROPOSED SOLUTION Approve the benefits insurance renewal with the respective carriers and the contingency,as described above, to ensure continued coverage for employees and eligible dependents. TIMING CONCERNS Board approval will ensure OC San meets the associated deadlines to finalize insurance contracts in August for continued health insurance coverage. RAMIFICATIONS OF NOT TAKING ACTION Without Board approval,OC San cannot finalize insurance contracts,resulting in a lapse of health and welfare benefits for employees and eligible dependents,and noncompliance with collective bargaining agreements, personnel policies, and adopted resolutions. PRIOR COMMITTEE/BOARD ACTIONS N/A ADDITIONAL INFORMATION PRISM Risk Sharing Pool The membership with PRISM,which was approved by the Board of Directors in May 2015,has resulted in cost-effective health insurance coverage for OC San by leveraging volume as we are part of a risk-sharing pool comprised of public entities. Medical Insurance OC San offers a choice of medical plans through Anthem Blue Cross and Kaiser Permanente. HMO (Health Maintenance Organization)plans offer comprehensive coverage.Employees have a choice between the Anthem Blue Cross HMO or the Kaiser HMO plan.The PPO (Preferred Provider Organization)plan through Anthem Blue Cross offers a network of doctors and healthcare facilities that provide services to plan members at special discounted rates.OC San also offers two high- deductible plans to eligible employees:a high-deductible HMO plan through Kaiser and a high- deductible PPO plan through Anthem Blue Cross. Dental Insurance OC San provides the Delta Dental plan to all benefit eligible employees. Vision Insurance OC San provides vision insurance to all benefit eligible employees through Vision Service Plan (VSP). Basic Life Insurance Life insurance provides protection for an employee’s beneficiary in the event of death.All benefit eligible full-time and part-time employees automatically receive Basic Life and Accidental Death &Orange County Sanitation District Printed on 7/13/2026Page 3 of 5 powered by Legistar™ File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11. eligible full-time and part-time employees automatically receive Basic Life and Accidental Death & Dismemberment insurance coverage.The benefit amount is up to $50,000 for employees,and three times salary for managers and executives. Coverage is currently offered by Lincoln Financial. Short-Term Disability Insurance The short-term disability insurance plan provides income protection on a temporary basis for employees who are unable to work due to a non-work-related illness or injury.Under the plan, income benefits may be received for up to 26 weeks.OC San pays the entire cost of coverage for regular full-time and part-time employees. Coverage is currently offered by Lincoln Financial. Long-Term Disability Insurance The long-term disability insurance plan provides income protection for an extended period for employees who are unable to work due to a non-work-related illness or injury.Under the plan, employees who are disabled for more than 90 days are eligible to receive a benefit of 67%of their basic monthly pay,up to $5,000/month.OC San pays the entire cost of coverage for regular full-time and part-time employees with five or more years of service.Coverage is currently offered by Lincoln Financial. Executive Disability This is a supplemental long-term disability insurance plan,which provides increased income protection for executives and managers.Under the plan,eligible employees who are disabled for more than 90 days due to a non-work-related illness or injury are eligible to receive an additional benefit of $3,100/month.The first $5,000/month is covered by the OC San group long-term disability plan benefit. Coverage is offered through The Standard. Health Savings Account Eligible employees who elect the Anthem High-Deductible Health Plan (HDHP)are simultaneously enrolled in a Health Savings Account (HSA)which is governed by IRS rules and provides a tax- favorable method for employees to contribute and withdraw funds for qualified health-related expenses.In accordance with collective bargaining agreements,OC San currently makes an annual contribution to the HSA based on the increased deductible and the savings generated by employees electing the HDHP plan compared to the PPO plan. Coverage is offered through HealthEquity. Health Reimbursement Arrangement Eligibility for enrollment in a Health Reimbursement Arrangement (HRA)is based on employee group affiliation,and only a subset of OC San’s employee groups participates.This plan provides participants and eligible dependents with individual accounts for reimbursement of qualified medical expenses during retirement or following separation from OC San.OC San covers administrative costs up to $30 per participant per year and makes a monthly contribution to employee accounts based on the agreed upon terms outlined in a collective bargaining agreement or Resolution. Coverage is offered through BPAS/Voya. Flexible Spending Accounts Flexible Spending Accounts (FSAs)allow employees to set aside funds on a pre-tax basis to pay for qualified healthcare and/or dependent care expenses during a particular plan year.OC San offers Healthcare, Dependent Care, and Limited Purpose FSA accounts. Orange County Sanitation District Printed on 7/13/2026Page 4 of 5 powered by Legistar™ File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11. Employee Assistance Program The Employee Assistance Program (EAP)protects employees and family members when they need help with personal problems such as marital and relationship problems;stress,anxiety,and depression; grief and loss; or substance abuse. Coverage is offered through ComPsych. CEQA N/A FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2026-27 and FY 2027-28,Section 5,Page 4,Operating Budget)and the budget is sufficient for the recommended action. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: N/A Orange County Sanitation District Printed on 7/13/2026Page 5 of 5 powered by Legistar™ ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5017 Agenda Date:7/22/2026 Agenda Item No:12. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: RENEW VMWARE SOFTWARE ENTERPRISE LICENSE AGREEMENT,SPECIFICATION NO.S- 2026-732BD GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Purchase Order Contract to Nth Generation Computing, Inc.for the purchase of the VMware Software Enterprise License Agreement (ELA) Subscription, Specification No. S-2026 -732BD, for a five (5)-year term, with a total amount not to exceed $3,565,600 plus applicable sales tax; and B. Approve a contingency in the amount of $356,560 (10%). BACKGROUND Orange County Sanitation District’s (OC San)current VMware Enterprise License Agreement (ELA) is ending in August 2026.VMware is used at OC San for server and desktop virtualization in both Office and Industrial Control System computing environments.Virtualization is a technology that creates virtual representations of servers,storage,networks,and other physical machines.It provides high availability and resiliency, increases efficiency, and reduces expenses. This purchase order contract represents a significant increase in cost over the prior period.The VMware product was purchased by Broadcom which packaged the product differently and raised the price for the more complete product offering.The competitors in this product space matched this product packaging strategy.In response OC San has chosen VMware for both virtualization and related storage management as it is still the most cost-effective solution. RELEVANT STANDARDS ·24/7/365 treatment plant reliability ·Ensure the public’s money is wisely spent ·Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard ·Protect OC San assets Orange County Sanitation District Printed on 7/13/2026Page 1 of 3 powered by Legistar™ File #:2026-5017 Agenda Date:7/22/2026 Agenda Item No:12. PROBLEM The current VMware ELA expires in August 2026.A lapse in coverage could impact OC San’s production computing environment. PROPOSED SOLUTION Renew the VMware Enterprise License Agreement Subscription. TIMING CONCERNS Renewal of VMware ELA is imperative for the continued uninterrupted support and safety of plant operations. RAMIFICATIONS OF NOT TAKING ACTION A decision not to renew the VMware ELA means the solution would no longer be supported,security patches could not be applied, and VMware products could not be used legally. PRIOR COMMITTEE/BOARD ACTIONS July 2023 -Approved a Purchase Order to Nth Generation Computing,Inc.for the purchase of the VMWare Enterprise License Agreement (ELA)Subscription Upgrade and Renewal for a three (3) year term using the NASPO ValuePoint Master Agreement No.AR2472,California Contract #7-17- 70-40-05,for a total amount not to exceed $574,585 plus applicable sales tax;and Approved a contingency in the amount of $57,458 (10%). July 2018 -Authorized a Purchase Order Contract with Nth Generation Computing,Inc.for VMware Licenses and Support,Specification Number S-2018-954BD-R,for a total amount not to exceed $595,272; and Approved a contingency of $59,527 (10%). ADDITIONAL INFORMATION An invitation for bids was issued on May 7,2026,via OpenGov.Bids were due on June 1,2026.OC San received three (3) bids, which are valid for 180 calendar days from the bid opening date. The following is a list of the firms that submitted a bid: Company Name Bid Determination Nth Generation Computing, Inc.$3,565,600 Responsive / Responsible Saitech Inc $3,570,995 Responsive / Responsible ePlus Technology $3,624,279 Responsive / Responsible Based on these results,staff recommends awarding the Purchase Order Contract to Nth Generation Computing,Inc.The term of this Purchase Order Contract will begin upon the effective date of Notice to Proceed. Orange County Sanitation District Printed on 7/13/2026Page 2 of 3 powered by Legistar™ File #:2026-5017 Agenda Date:7/22/2026 Agenda Item No:12. CEQA N/A FINANCIAL CONSIDERATIONS This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (FY 2026-27 &2027-28 Budget,Section 6,Page 24,Repairs &Maintenance)and the budget is sufficient for the recommended action. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: N/A Orange County Sanitation District Printed on 7/13/2026Page 3 of 3 powered by Legistar™ ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13. FROM:Robert Thompson, General Manager Originator: Jennifer Cabral, Director of Communications SUBJECT: PUBLIC AFFAIRS STRATEGIC PLAN FOR FISCAL YEARS 2024-2026 SUMMARY GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the Public Affairs Strategic Plan for Fiscal Years 2024-2026 Summary. BACKGROUND The Orange County Sanitation District’s (OC San)Public Affairs Office is responsible for developing, managing and disseminating all internal and external communications.The primary objective of the Public Affairs team is to ensure messages are accurate,transparent,and foster trust and confidence in OC San.An integrated Public Affairs Strategic Plan is essential to engage the diverse audiences and align outreach efforts with OC San’s mission and values. RELEVANT STANDARDS ·Build brand, trust, and support with policy makers and community leaders ·Maintain collaborative and cooperative relationships with regulators,stakeholders,and neighboring communities ·Make it easy for people to understand OC San’s roles and value to the community ·Maintain influential legislative advocacy and a public outreach program PROBLEM OC San’s Public Affairs Office supports a wide range of initiatives that require effective communication to both internal and external stakeholders.Inconsistent or uncoordinated messaging can reduce impact and hinder public understanding of OC San’s mission and services. PROPOSED SOLUTION The Public Affairs Strategic Plan for Fiscal Years 2024-2026 included goals,objectives,strategies, and tactics to execute the various messages and efforts set forth by OC San.The two-year plan was effective through June 2026,with updates provided to the Administration Committee every six months,including a year-end report.With the period complete,a summary report has beenOrange County Sanitation District Printed on 7/13/2026Page 1 of 5 powered by Legistar™ File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13. months,including a year-end report.With the period complete,a summary report has been prepared. PRIOR COMMITTEE/BOARD ACTIONS December 2025 -Received and filed the Public Affairs Strategic Plan for Fiscal Years 2024-2026 Mid -Year Update. July 2025 -Received and filed the Fiscal Year 2024-2025 Year-End Update to the Public Affairs Strategic Plan (FY 2024-2026). December 2024 -Received and filed the Public Affairs Strategic Plan for Fiscal Years 2024-2026 Mid -Year Update. June 2024 - Received and filed the Public Affairs Strategic Plan for Fiscal Years 2024-2026. ADDITIONAL INFORMATION Summary of Fiscal Years 2024-2026: OC San’s Public Affairs Office Strategic Plan for Fiscal Years 2024-2026 (Plan)was developed based upon the principles of OC San’s mission of protecting public health and the environment and to support the implementation of OC San’s Strategic Plan.This Plan offered a vision to unify communication efforts and focus resources to achieve the greatest impact and greatest results.The Plan consisted of 11 categories. Below is a summary of the completed goals of the two-year plan. ·Employee Engagement Communications Goal: Optimize communication with internal audience including those operating in the field. o Conducted an Employee Engagement Survey in fall 2024 with a 55 percent response rate o Launched the Community Corner initiative in response to feedback from the engagement survey and held three events across Plant Nos. 1 & 2 and Headquarters o Redesigned the Volunteer Incentive Program to increase employee participation §1,160 volunteer hours o Launched a newly designed intranet (The San Box) §Posted 1,241 stories and updates o Distributed 104 Three Things to Know Emails (weekly email) o Published 12 issues of the employee newsletter,The Pipeline o Hosted 10 employee events o Developed a new employee welcome kit and distributed 82 kits o Held an employee t-shirt design contest;the winning design is available at the OC San company store o Held first ever Employee Art Contest with six submissions o Hosted the Honor Wall event for five honorees and over 100 guests o Hosted the Take Your Kid to Work Day event for the first time since 2017 with over 200 kids and over 100 employees participating o Held the first Employee Family Picnic in over 20 years,with more than 300 staff and Orange County Sanitation District Printed on 7/13/2026Page 2 of 5 powered by Legistar™ File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13. o Held the first Employee Family Picnic in over 20 years,with more than 300 staff and family members in attendance ·Industry Experts Goal:Establish and solidify OC San’s reputation as infrastructure leaders in the wastewater and resource recovery industry. o 54 agency awards received with 23 of them specific to Public Affairs o 54 speaking engagements, reaching over 1,400 people o Launched the Resource Innovation for a Sustainable Environment (RISE)program highlighting our sustainability initiatives ·Media Relations Goal: Cultivate relationships with traditional and social media journalists and influencers. o 14 press releases issued o 1,421 social media posts across five platforms with an average reach of 6,300 o 2,865 new followers across four platforms o 48 articles published (including an OC San mention) ·Agency Branding and Messaging Goal:Enhance OC San’s image and branding by utilizing proper messaging in external communication pieces such as OC San’s website,presentations,digital media,and advertising, which includes maintaining a positive experience for OC San visitors. o Published eight (8)issues of the OC San Connection Newsletter,reaching an average of 3,500 subscribers per issue o Published 107 articles on the OC San website o Completed 387 graphic design projects o Installed an educational pipe display for OC San Headquarters o Updated OC San’s Video library - nine (9) new videos completed o Added 106 new honorees to the Honor Roll Permittee awards program o Developed and launched a new website ·Educational Outreach Goal:Identify and implement avenues for education and outreach within OC San’s service area to promote OC San’s mission and vision. o Hosted 229 tours reaching over 4,650 people o Partnered with the Heritage Museum of Orange County through June 2025 to include OC San messaging reaching approximately 2,500 people o Participated in 24 community events reaching over 4,200 people o Continued Inside the Outdoors program,resulting in engagement with over 2,400 students o Held three sessions of the Wastewater 101 Citizens’Academy that concluded with 178 graduates o Created and launched a Library Program to highlight OC San messaging and careers in wastewater o Hosted a film screening of a documentary highlighting America’s essential water Orange County Sanitation District Printed on 7/13/2026Page 3 of 5 powered by Legistar™ File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13. professionals, attended by over 100 guests ·Capital and Maintenance Outreach Goal:Develop and implement outreach programs that will engage the communities affected by OC San construction and maintenance activities. o Provided outreach support for more than a dozen Capital Improvement Program projects o 34 printed notifications distributed reaching over 71.4k people o 73 electronic messages issued, reaching over 2,400 residents o Four (4) presentations given to City Councils o Held four (4) community meetings o Conducted Construction Outreach team training for engineering staff o Visited neighborhoods to share project information with residents ·Legislative Affairs Goal:Proactive engagement in legislative advocacy efforts that could impact OC San and the wastewater industry. o Developed annual Legislative and Regulatory Plan o Issued 16 State position letters o Issued two (2) Federal position letters o Actively tracked 60 bills o Participated in Advocacy Day in Sacramento and met with six representatives from different Senate and Committee offices ·Grants Coordination Goal: Monitor, track, and apply for grants available to OC San. o Continued supporting the $3.45 million in community project funding o Researched grant opportunities applicable to OC San ·Local Government Affairs Goal:Ensure that local elected officials,member agencies,stakeholders,and OC San Board Members are actively engaged in the work of OC San. o Board Member Speaking Points issued monthly o Coordinated Board Member Orientation o Developed OC San’s Annual Report o Hosted two in-person State of OC San events reaching over 150 participants for each event o Hosted representatives from 43 public agencies and council/board offices for facility tours o Published 24 “Five Minutes Per Month” emails o Produced eight (8) member-agency outreach toolkits ·Crisis Management Goal:Ensure the Public Affairs Office serves as the primary spokesperson for OC San during normal business and crisis scenarios and facilitates the dissemination of information. o Continued monitoring and updating the Public Affairs Office’s Continuity of Operations Orange County Sanitation District Printed on 7/13/2026Page 4 of 5 powered by Legistar™ File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13. o Continued monitoring and updating the Public Affairs Office’s Continuity of Operations Plan o Supported OC San during emergency situations o Participated in tabletop exercises ·General Manager Support Goal:Ensure the General Manager and Assistant General Managers are supported with information necessary to communicate to the varied OC San audiences. o Produced 24 General Manager Reports o Prepared 24 Board Member talking points o Planned and hosted two (2) All-Hands meetings o Developed material for speaking engagements and presentations o Coordinated Strategic Planning update workshops o Facilitated General Manager’s Work Plan coordination including mid-year updates and year-end reports FINANCIAL CONSIDERATIONS All items included in the Public Affairs Strategic Plan for Fiscal Years 2024-2026 were budgeted in the FY 2024-2026 Budget. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Public Affairs Strategic Plan, FY 2024-2026 ·Public Affairs Portfolio, FY 2024-2026 ·Presentation Orange County Sanitation District Printed on 7/13/2026Page 5 of 5 powered by Legistar™ PAO Strategic Plan FY 2024-26 June 2024 1 Public Affairs Strategic Plan FY 2024-2026 Introduction The Orange County Sanitation District’s (OC San) Public Affairs Office (PAO) is responsible for managing all internal and external communications. The PAO's main goal is to ensure messages are accurate, transparent, and build public trust and confidence. An integrated Public Affairs Strategic Plan is essential for effectively addressing the diverse audiences we serve. The PAO offers services, tools, and programs to meet OC San’s communication needs. This includes media relations, website and intranet site content, construction outreach, elected officials and government relations, internal communications, education, outreach, and graphic development. The PAO has developed a Strategic Plan (Plan) for Fiscal Years 2024 - 2026. This Plan is developed based upon the principles of OC San’s Mission of protecting public health and the environment and will support the implementation of OC San’s Strategic Plan. This Plan offers a vision to unify our communication efforts and focus resources to achieve the greatest impact and greatest results. Because much of what is planned and created by this group is based on external factors and therefore outside of our control, flexibility and fluidity is integrated into the Plan. The PAO will follow the guidance set forth by management and the Board of Directors to carry out OC San’s messaging and support our member agencies. Background Information OC San represents 20 cities, 4 special districts, and a portion of the unincorporated County of Orange. This area represents a community of 2.6 million people with approximately 550,000 customer accounts. Unlike most public agencies where there is direct contact with customers, OC San’s billing occurs through the County of Orange property tax bills. Therefore, OC San must work through other means to communicate with the public and the rate payers. We have a 25-member Board of Directors, and more than 650 employees within six departments with various goals and objectives. While these groups work independently on a variety of projects, the goal of the PAO is to provide support and messaging that is consistent throughout the agency so that we are one voice, representing the same overall goals, and portraying the same brand. PAO Strategic Plan FY 2024-26 June 2024 2 There are many challenges with serving such a large and diverse customer base, however; there are also great opportunities working through the strategies laid out in this Plan. Public Affairs Team The division is staffed with seven full-time employees and overseen by a supervisor and a department head. Jennifer Cabral, Director of Communications Daisy Covarrubias, Public Affairs Supervisor Rebecca Long, Senior Public Affairs Specialist Belen Carrillo, Senior Public Affairs Specialist Kelly Newell, Public Affairs Specialist Public Affairs Specialist – Vacant Gregg Deterding, Graphics Designer Isai Carrillo, Graphics Designer Cheryl Scott, Administrative Assistant Each of these team members carry out specific functions to meet the communication goals and objectives laid out in this Plan. Situation Analysis • OC San approved a five-year rate program in 2023. Public communication must account for the financial impact on OC San ratepayers as decisions and proposed fees for the next five years are developed and communicated. • OC San must continue to attract talented and qualified personnel to fill vacancies. Effectively communicating OC San’s culture and emphasizing the importance of professional relationships is essential to the effectiveness and functionality of the agency. • OC San will have new Board leadership and is anticipating a high turnover post the November 2024 election. Continuous engagement with the Board of Directors will be critical for the success of this agency. PAO Strategic Plan FY 2024-26 June 2024 3 • As an essential service, OC San has continued to execute the Capital Improvement Program (CIP) to keep the regional projects on schedule, improving and maintaining the regional sewer system throughout the service area. In the next two fiscal years, OC San plans to award 38 construction contracts worth a total of $340 million. • OC San administrative staff have moved into a new Headquarters across the street from Plant No. 1, in Fountain Valley. The new building houses over 300 staff members that were previously spread across 10 buildings. Internal communications and engagement will need to become a greater focal point to ensure OC San’s culture remains positive between staff located at the Plants, and staff at Headquarters. Mission The Public Affairs Office is committed to communicating information about OC San in a timely, accurate and accessible way to the employees, the Board of Directors, our member agencies, elected officials, the public, and the news media. • We are committed to open, honest, clear, and respectful two-way communication with our audiences. • We are dedicated to informing others about how OC San serves the public and protects the environment. • We are committed to outstanding customer service by responding to requests quickly and efficiently. • We are dedicated to teamwork and collaboration as well as being creative and taking the initiative to be out in front of issues. Audiences This Public Affairs Plan focuses largely on four primary audiences. • Internal o Board of Directors o Executive Management Team o Employees o Retirees • The Public o Ratepayers o Member Agencies o Residents, Businesses, Commuters Impacted by OC San Construction and Maintenance PAO Strategic Plan FY 2024-26 June 2024 4 o OC San Neighbors near our facilities (plants and pump stations) o Schools and Students o Tour Groups • Industry o Water/Wastewater Agencies o Trade Organizations o Trade Media o Contractors and Consultants • Influential Public o Local, State, and Federal Elected Officials o Environmental Groups o Local Media Agency Key Messages • OC San is committed to protecting public health and the environment by providing effective wastewater collection, treatment, and recycling. • OC San is more than a wastewater treatment facility; we are a resource recovery facility making use of all our byproducts. • OC San is dedicated to exceeding wastewater quality standards used for resource recovery. • OC San is committed to proper planning to ensure that public funds are wisely spent. • OC San’s assets are monitored and evaluated regularly to ensure top performance and timely replacement. • OC San values communicating our mission and strategies with those we serve and all other stakeholders. • OC San provides an essential service to 2.6 million people at one of the lowest rates in the state. • Providing reliable, responsive, and affordable services in line with our customer needs and expectations is a top priority for OC San. • OC San is committed to creating the best possible workforce, prioritizing safety, productivity, customer service, and training. PAO Strategic Plan FY 2024-26 June 2024 5 • OC San has diligently developed an integrated planning environment that starts with the Board of Directors’ expectations and extends to each employee’s work product. We strive to ensure our staff members communicate effectively and provide transparent services to support the Plan. • OC San has developed an integrated Planning/Asset Management system that allows for intentional, thoughtful decision making to maintain current operations while adding resilience and meeting new challenges. • OC San’s organizational structure includes informal relationships between employees that facilitate collaboration toward common goals. Public Affairs’ Goals for Fiscal Year 2024/25 and 2025/26 1. Optimize communication with our internal audience. 2. Continue to build OC San’s reputation as leaders in the wastewater and resource recovery industry. 3. Cultivate relationships with traditional and social media journalists and influencers to promote OC San’s programs and initiatives. 4. Enhance OC San’s image and branding by utilizing proper messaging in external communication pieces such as OC San’s website, presentations, digital media, and advertising. Maintain a positive experience and image for our visitors. 5. Identify and implement avenues for education and outreach within OC San’s service area to further promote OC San as a resource recovery agency, our mission, and career opportunities within the wastewater industry. 6. Educate and inform the public on the various OC San initiatives aimed to protect the environment such as What 2 Flush; Fats, Oil, and Grease; and any other necessary message. 7. Develop and implement outreach programs that will engage the communities affected by OC San’s construction projects. 8. Ensure proactive engagement in legislative advocacy efforts that could impact OC San and the wastewater industry. 9. Monitor, track, and apply for grants available and that make business sense to OC San. 10. Ensure that elected officials, member agencies, stakeholders, and OC San Board Members are actively engaged in the work of OC San. 11. Ensure the Public Affairs Office serves as the primary spokesperson for OC San during normal business and crisis scenarios and facilitates the dissemination of information. PAO Strategic Plan FY 2024-26 June 2024 6 To achieve these goals, PAO outlines the following strategies and tactics, along with the primary staff assigned to each area. Although individual staff members are the key contacts for each of the goals, the team works collectively and collaboratively, reflecting our core values. Our staff acknowledges the key role we play at OC San, not only communicating information, but also educating, consulting, and serving as a resource to our Board of Directors, employees, the wastewater industry, our member agencies, and our community. Flexibility is implemented into this plan to deal with unexpected situations and circumstances. Public Affairs Strategies and Tactics 1. Category: Employee Engagement Program Lead: Rebecca Long Program Coordinator/Support: Kelly Newell, Gregg Deterding, Isai Carrillo, and Cheryl Scott Goal (what): Optimize communication and engagement with our internal audience to include both field staff and administrative staff. Objective (measure): Establish a base line of current engagement by tracking access and participation from the identified tactics. Strategy (why): We value open and honest communication with our employees. PAO is committed to various efforts aimed at keeping OC San employees informed about important topics, increasing the overall quality of communications to our employees while tying the business aspects of the agency with the human-interest side. Tactics (how): • Keep information on The San Box current, relevant, and useful for OC San employees by working with the various departments to gather information that should be shared. • On a regular basis, staff will continue to support various departments with their communication and outreach needs. • PAO will produce six Pipeline newsletters per year with a goal of circulation by the third week of the publication month. • Incentivize employees to educate and inform the public of OC San’s essential service through the Volunteer Incentive Program (VIP) by issuing points for all volunteer hours. • Create employee recognition and celebratory events throughout the year, this may include small in-person gatherings and virtual events. To include but not limited to the Annual Holiday Lunch, the Harvest Festival, and VIP Celebration, etc. • Continue with the Honor Walk program which acknowledges retired staff and past Board Members for their contribution to OC San. The recognition event will be hosted every other year starting in 2025. PAO Strategic Plan FY 2024-26 June 2024 7 • Write and coordinate the 3 Things to Know email blast to be distributed to all staff each Monday. • Support and promote OC San “U”, OC San’s training program. • Create “New Employee Welcome Kit” to be distributed on employees first day of work to introduce employees to the OC San culture, include electronic communication with key messages and link to important information. • Create and implement an employee engagement audit to assess the value of the information shared, the method used, and feedback on OC San’s culture. o Conduct periodic surveys following employee events to allow for improvements and/or modifications. • Implement an employee art contest using OC San’s infrastructure. 2. Category: Industry Experts Program Lead: Kelly Newell Program Coordinator/Support: Public Affairs Specialist, Gregg Deterding, Isai Carrillo, and Cheryl Scott Goal (what): Establish and solidify OC San’s reputation as infrastructure leaders in the wastewater and resource recovery industry. Objective (measurable): Increase participation in strategic organizations through conferences, networking activities and awards by five percent. Strategy (why): To build positive public perception and confidence among our various audiences. Tactics (how): • Encourage participation and presentation in conferences. • Encourage and support award application submittals. • Publicize and coordinate award acceptance logistics. • Track all awards won by OC San by keeping a master list. • Track and promote staff abstracts, and publications. 3. Category: Media Relations Program Lead: Rebecca Long Program Coordinators: Kelly Newell, Belen Carrillo, Gregg Deterding, and Cheryl Scott Goal (what): Cultivate relationships with traditional and social media journalists and influencers. PAO Strategic Plan FY 2024-26 June 2024 8 Objective (measurement): Track and increase media coverage with positive stories about OC San. Strategy (why): While a presence in the community is important to putting a face to our agency, media (traditional and social) is equally important with a broader reach and a more direct line of communication. Tactics (how): • Annually update media list to stay current and fresh. • Maintain a digital press kit. • Build a calendar of news release topics of interest to the public and stakeholders. • Invite media for a facility tour, including traditional and non-traditional media. • Develop media strategies for important events, decisions, or actions. e.g. CIP Campaign (see details in Category 6: Capital and Maintenance Outreach • Weekly (3-5 times) social media posts about the happenings at OC San with focus on OC San’s accomplishments and mission. • Continue with social media campaigns # #OCSanCareers, #What2Flush, and those currently supporting ongoing efforts. 4. Category: Agency Branding and Messaging Program Lead: Belen Carrillo Program Coordinators/Support: Gregg Deterding, Isai Carrillo, Kelly Newell, Public Affair Specialist, and Cheryl Scott Goal (what): Enhance OC San’s image and branding by utilizing proper messaging in external communication pieces such as OC San’s website, presentations, digital media, advertising, which includes maintaining a positive experience for OC San visitors. Objective (measure): Continue with OC San’s branding campaign including updating collateral material, signage, and promotional material as appropriate and as it is used. Maintain the lobby(s) current and informative with relevant information, i.e., displays, awards case, etc. Strategy (why): A cohesive voice, message, look, and feel are critical to the public perception that an organization holds with its community. A positive and pleasant in-person experience reinforces OC San’s culture and core values as well as showcasing OC San as industry leaders, and a well-run organization, leaving behind the stigma of typical government agencies. Tactics (how): • Develop new website to better meet the information needs of our visitors while meeting accessibility standards. PAO Strategic Plan FY 2024-26 June 2024 9 • Maintain website accuracy, relevancy and timeliness with new stories posted weekly. • Provide presentations, consultation, and advice on the branding and image of OC San. • Develop new collateral materials around the key messages. • Explore advertising options to inform the public of agency efforts and role in enhancing the local economy. • Fulfill all requests for graphics, photos, and logos. • Continue with online community newsletter. Increase reach and distribution list. • Update and maintain signage across OC San facilities. • Develop a Board approved design for the hands-on educational display for the outdoor patio. • Maintain the lobby wall in the Operations Center at Plant No. 2 with OC San’s current branding and messaging and implement lobby display at the Headquarters. • Rotate flags on light poles at Plant No. 1 and at Plant No. 2 on a biennial basis. • Keep the award display up to date by rotating awards. • Install a retiree display in the Headquarters and keep it up to date. • Maintain and coordinate the installation of Honor Walk bricks on a biennial basis. • Display collateral material in a neatly and organized manner displayed with current and relevant information. • Update a video library of OC San programs to utilize as educational and promotional tools. • Promote implementation of OC San’s permittee awards program that recognizes industries for improving their adherence to excellent standards and expand to recognize multi-year awardees. Identify methods to include waste haulers in recognition system. 5. Category: Educational Outreach Program Lead: Belen Carrillo Program Coordinators/Support: Kelly Newell, Public Information Specialist, Gregg Deterding, Isai Carrillo, and Cheryl Scott Goal (what): Identify and implement avenues for education and outreach within OC San’s service area to promote OC San’s mission and vision. Objective (measurement): Create and identify new educational opportunities including virtual events and webinars to promote and educate the community on OC San’s work and the essential service provided. Strategies (why): To further promote OC San as a resource recovery agency, promote OC San’s mission and promote career opportunities within the wastewater industry. Tactics (how): PAO Strategic Plan FY 2024-26 June 2024 10 • Execute the Inside the Outdoors contract for Fiscal Year 2025-2026 to continue the educational partnership that includes the Sewer Science program to 500 students within Orange County and introduce them to OC San’s virtual tour program. • Revise plant tours to incorporate Headquarters. • Identify 8-10 community event opportunities for OC San to participate in to inform and educate the community on the important role OC San plays in public health and the environment. • Expand OC San’s speaker’s bureau to provide a wider set of speakers available. • Continue hosting Wastewater 101 Citizen Academy for our ratepayers, and influential public to showcase OC San operations and initiatives. Host one session with four classes per year. • Support the Heritage Museum of Orange County’s educational efforts by supplying material to be used for virtual and in-person teaching of OC San’s key messages. • Connect with OC San service area libraries to identify possible OC San program collaboration and implementation opportunities that would aim to. highlight selected OC San messaging points such as What 2 Flush, the wastewater treatment process, and career opportunities. 6. Category: Capital and Maintenance Outreach Program Leads: Belen Carrillo and Tanya Chong from Engineering, Program Coordinators/Support: Kelly Newell, Public Affairs Specialist, Rebecca Long, Gregg Deterding, Isai Carrillo, Cheryl Scott, Goal (what): Develop and implement outreach programs that will engage the communities affected by OC San construction and maintenance activities. Objective (measurement): Develop, implement, and provide outreach support for over 10 capital projects scheduled to break ground in fiscal years 2024/2025 and 2025/2026 in more than 10 cities. Strategy (why): Form a positive presence in the community prior to the start of construction projects or maintenance activities that is personal and proactive. Provide impacted community with information ahead of construction activities. Inform them of the benefits and need for the project to gain support and understanding of the necessary construction. Tactics (how): • Proactively offer briefings and community meetings to impacted neighborhoods, civic groups, businesses, schools, churches, and other institutions within the project area on an as needed basis. PAO Strategic Plan FY 2024-26 June 2024 11 • Explore the option of placing advertising pieces in communities/areas impacted by construction. • Respond to inquiries within a 24-hour period. • Provide project description and notifications to impacted residents at least two weeks before construction begins. • Update collateral materials, fact sheets and website with current construction information on an as needed basis. • Maintain ongoing communications with city staff and Board Members on current and upcoming construction outreach projects in affected cities. • Maintain ongoing communications with impacted residents within the project area through collateral material (e.g., flyers, door hangers, emails, text alerts, social media posts, etc.). • Measure customer satisfaction through a construction outreach survey to be distributed at the close of construction programs. • Provide outreach program training for the engineering team to help them understand the outreach program, the role of the community liaison and benefits to project. • Implement a multipronged outreach strategy that will include industry and media coverage for the Supercritical Water Oxidation project. 7. Category: Legislative Affairs Program Lead: Rebecca Long Program Coordinator/Support: Kelly Newell, Public Affairs Specialist, and Cheryl Scott Goal (what): Proactive engagement in legislative advocacy efforts that could impact OC San and the wastewater industry. Objective (measure): Continue positive relationships with local, state, and federal officials through facility tours, meetings, and bill tracking as stated in the Legislative Plan. Strategy (why): Legislative advocacy is an important aspect of our business. Having relationships and being actively involved, providing input and OC San’s perspective on potential legislature can and does directly affect OC San and our business. The PAO is responsible for executing the Board approved Legislative Plan, which is updated on an annual basis. In addition, staff is responsible for tracking state and federal legislation, managing OC San’s legislative advocates, and seeking appropriations and grants. Tactics (how): • Develop and implement Annual Legislative Plan in the second quarter of each fiscal year. PAO Strategic Plan FY 2024-26 June 2024 12 • Track bills and maintain a priority list of key legislation. • Provide regular updates to the Legislative and Public Affairs Committee on state and federal matters. • Host legislative tours. • Engage in Advocacy Days in Sacramento and Washington DC as needed. • Take positions on bills that could affect OC San or the industry. • Work with industry organizations on state and federal issues to ensure OC San’s positions are communicated. • Partner with industry organizations to co-host virtual events and activities. • Manage the legislative advocates’ contracts and facilitate regular communication between lobbyists, staff, and the Board of Directors. 8. Category: Grants Coordination Program Lead: Rebecca Long Program Coordinator/Support: Kelly Newell, Public Affairs Specialist, and Cheryl Scott Goal (what): Monitor, track, and apply for grants available to OC San. Objective (measure): Apply and obtain grants for qualified OC San projects and programs. Strategy (why): Outside funding is important in moving OC San projects and programs forward. With ongoing attention to government spending, it is vital for OC San to apply for and secure grants to offset costs when available. Tactics (how): • Apply for two grants a year based on availability. • Ensure Grant Policy is updated and current. • Research grant opportunities and report out to the Legislative and Public Affairs Committee. • Seek out available grant funding opportunities for OC San and its various divisions. • Secure letters of support. • Publicize grant awards received. • Create and measure outcomes. 9. Category: Local Government Affairs Program Lead: Rebecca Long and Belen Carrillo Program Coordinators/Support: All PAO staff Goal (what): Ensure that local elected officials, member agencies, stakeholders, and OC San Board Members are actively engaged in the work of OC San. PAO Strategic Plan FY 2024-26 June 2024 13 Objective (measure): Provide at least two communication tools per month. Strategy (why): Keeping OC San’s influential public engaged in OC San’s projects and accomplishments are critical to the support and success of our agency. Tactics (how): • Provide Board of Directors with speaking points following every OC San board meeting that can be used when reporting back to their respective councils and community groups. • Support an orientation (as needed) for new Board members. • Develop and keep a current list of monthly informational presentations. • Maintain an informational presentation video library for the Board of Directors on key agency topics. • Provide regular reports to the Steering Committee. • Develop OC San’s Annual Report. • Publish a Five Minutes Per Month, each month. • Participate in government affairs committees. • Invite new council and board members within OC San’s service area to take a tour of OC San and offer presentations to their respective agencies on OC San programs and efforts. • Create and distribute quarterly outreach tool kits for member agency PIOs to help them easily share and disseminate information about OC San. • Host a “State of OC San” event for influential leaders throughout the infrastructure and water/wastewater industry, including virtual option. 10. Category: Crisis Management Program Lead: Rebecca Long Program Coordinators/Support: All PAO Staff Goal: Ensure the PAO serves as the primary spokesperson for OC San during normal business and crisis scenarios and facilitates the dissemination of information. Objective: Ensure that the PIOs in the PAO can respond in a crisis. Provide the necessarily tools and material to follow established protocols and support the situation as needed. Strategy: It is imperative during a crisis that OC San be proactive and provide clear and effective messaging to employees, public, and the media. PAO Strategic Plan FY 2024-26 June 2024 14 Tactics (how): • Maintain an updated crisis communication plan including regular briefings with staff to identify possible issues and responses. • Maintain and update PAO’s Continuity of Operations Plan (COOP). • Work with Risk and Safety Management on Public Affair’s role in an emergency, including our role via the Integrated Emergency Response Plan. • Ensure proper procedures are in place for Board, employees, and public notification. • Maintain updated contact lists for resource, member, and partnering agencies to coordinate and assist during crisis. • Develop protocols on everyday PAO tasks to facilitate the operations of the group in a time of crisis. 11. Category: General Manager Support Program Lead: Daisy Covarrubias / Rebecca Long Program Coordinators/Support: All PAO Staff Goal: Ensure the General Manager and Assistant General Managers are supported with information necessary to communicate to the varied OC San audiences. Objective: Develop monthly communication pieces on behalf of the General Manager. Ensure General Manager (or designee) is participating and involved in promoting OC San’s initiatives. Strategy: Collaborate with the General Manager to prepare communication and messaging that reflects the mission and vision of OC San. Tactics (how): • Assist the General Manager and the Assistant General Managers with keeping the Board Members informed and up to date with OC San activities. • Assist in the development of the General Manager’s Monthly Report. • Develop talking points for Board and Committee meetings. • Develop material and speaking points for presentations and speaking engagements. • Support the development of the OC San Strategic Plan. • Assist in the development of the General Manager’s Annual Work Plan, including mid- year and end of year reports. • Manage Ask the GM questions submitted. • Coordinate and support VIP tours guided by General Manager and Assistant General Manager. • Coordinate and produce annual All Hands meetings (live and/or pre-recorded) to keep employees informed and engaged. PAO Strategic Plan FY 2024-26 June 2024 15 Closing Comments This plan is a broad outline of the Public Affairs Office program. As new issues arise, new functions and duties will evolve as well. The role of the Public Affairs Office is to stay ahead of issues, be responsive and flexible to meet the needs of the agency. We will adjust our program accordingly. New Tactics Introduced • OC San new website – In progress • Library Educational Program • Headquarters Educational Display – Phase 2 • Library Educational Program • Video Library Update • Employee Engagement Audit • New Employee Welcome Kit • Employee Art Contest A Selection of Projects Completed in Fiscal Years 2024-25 and 2025-26 Public AffairsPortfolio Page left intentionally blank 3 MEET THE TEAM Jennifer CabralCommunications Manager Kelly NewellPublic Affairs Specialist Daisy CovarrubiasPublic Affairs Supervisor Rebecca LongPrincipal Public Affairs Specialist Gregg DeterdingGraphics Designer Belen Carrillo Senior Public Affairs Specialist Cheryl ScottAdministrative AssistantIsai CarrilloGraphics Designer Becky PolcynPublic Affairs Specialist 4 Branding 5 Internal Projects 12 External Projects 22 TABLE OF CONTENTS 5 BRANDING 6 BRANDINGLogo Design OC San Program - RISE OC San’s Intranet - The San Box OC San Employee Engagement Program - Community Corner 7 Light Pole Banners BRANDINGEnvironmental Design 8 BRANDINGEnvironmental Design Headquarters IT Service Desk Wall 9 Headquarters Artifact Wall BRANDINGEnvironmental Design 10 Water Dispenser wall art BRANDINGEnvironmental Design 11 Headquarters Lobby Digital Display FOGFATS, OILS, AND GREASE Never pour FOG down the drain. Learn more at ocsan.gov Stay Connected. Follow Us@OCSanDistrict “FLUSHABLE” WIPES ARE NOT FLUSHABLE WIPES AND PHARMACEUTICALS BELONG IN THE TRASHLearn more at ocsan.gov Learn more at ocsan.gov BRANDINGEnvironmental Design 12 EXTERNAL PROJECTS 13 EXTERNAL PROJECTSOC San Connection - Community Newsletter OC San Connection Summer 2025 published by the orange county sanitation district community newsletter Shining Bright Like FireworksHow OC San Generates Its Own Energy P. 4 OC San Connection Fall 2025 published by the orange county sanitation district community newsletter Big Pipes, Big History OC San Unveils Full-Scale Pipe Display P. 6 14 happening in the CITY OF NEWPORT BEACH Sign up for project alerts: www.ocsan.gov/baybridge Replacing the old with the new – OC San is coming soon to Coast Highway STARTING THIS SUMMER!2025-2029 a construction project by OC SAN Pump Station and Force Mains Replacement Project BAY BRIDGE Replacing the old with the new — OC San is coming soon to Coast Highway EXTERNAL PROJECTSConstruction Outreach Construction Project “Movie” Poster 15 3 Cities.3 Cities. 7 Miles of Regional Pipeline. 100 Manholes. CITY OF CYPRESS CITY OF LA PALMA CITY OF LOS ALAMITOS Cypress Trunk Sewer Project Visit ocsan.gov/cypress to learn more. Starting Summer 2025 and lasting approximately 3 years. 1 Project. EXTERNAL PROJECTSConstruction Outreach Construction Project “Movie” Poster 16 EXTERNAL PROJECTSConstruction Outreach Construction Project “Movie” Poster 17 Web Newsletter Header CONSTRUCTION IN CYPRESS! Postcard EXTERNAL PROJECTSConstruction Outreach 18 EXTERNAL PROJECTSSocial Media 19 Brian Bingman Mike McCarthy Yu-Li Tsai Jim Herberg Greg Sebourn H O N O R I N G SCAN TO RSVP or emailForinformation@ocsan.gov by Wednesday, June 18. e Honor Wall recognizes past board members and sta for their signicant contributions to the quality of operations and leadership. Honorees will be memorialized on a wall outside of OC San Headquarters in Fountain Valley. 18480 Bandilier Cir, Fountain Valley, CA 92708 | 714.962.2411 | www.ocsan.gov O R A N G E C O U N T Y S A N I T A T I O N D I S T R I C T Dr. Yu-Li Tsai dedicated nearly 30 years of his career to OC San, becoming a renowned technical expert, visionary leader, and mentor whose impact continues to shape the organization today. His work in the lab, particularly his pioneering efforts in molecular methods like Polymerase Chain Reaction for detecting wastewater viruses, earned him over 75 peer-reviewed publications and solidified his position as a leader in the wastewater industry. Dr. Tsai’s most significant achievement was his instrumental role in securing the National Environmental Laboratory Accreditation Program (NELAP) accreditation for OC San’s laboratory, making it the first municipal lab in California to achieve this distinction in 2017. His leadership and persistence led to OC San’s early adoption of the TNI Standard, elevating the lab’s quality assurance practices and ensuring the reliability and defensibility of its data. As a mentor, Dr. Tsai inspired and supported many within OC San, guiding colleagues through technical challenges, career advancements, and professional growth. His service extended beyond OC San, influencing the next generation of environmental scientists at UC Irvine and his lasting contributions to OC San. His dedication to scientific excellence, and commitment to the community make him so worthy to receive this honor. H O N O R I N G Yu-Li Tsai, Ph.D. 76 EXTERNAL PROJECTSEvent Branding Headquarters Lobby Digital Display Brochure Wall Graphic Invitation 20 Invitation ORANGE COUNTY SANITATION DISTRICTState of OC San Join our Board of Directors and General Manager as we discuss our accomplishments and exciting advances. An optional tour of our Fountain Valley Plant No. 1 will take place immediately following the event. Mile Square Golf Course Clubhouse10401 Warner AvenueFountain Valley, CA 92708 For more information or questions, email: forinformation@ocsan.gov Friday, October 2511 a.m. – 1 p.m. YOU’RE INVITED! ORANGE COUNTY SANITATION DISTRICT Lunch and Networking Welcome and State of OC San Presentation Board Chairman, Ryan Gallagher Facility tour immediately following program. A bus will be available to take you to our OC San Reclamation Plant No. 1. 10844 Ellis Avenue, Fountain Valley, CA 92708 State of OC San Friday, October 2511 a.m. – 1 p.m. P R O G R A M SCAN HERE to view the Fiscal Year 23/24 OC San Annual Report Program ORANGE COUNTY SANITATION DISTRICT State of OC San Welcome to Signage State of OC San ADRIANAGODINEZ Santa Ana Regional Water Quality Control Board Name Tag Protecting Public Health and the Environment Giveaway - Coaster EXTERNAL PROJECTSEvent Branding 21 EXTERNAL PROJECTSEvent Branding Presented by the OC San Board of Directors. Joaquin Esquivel, Chair of the State Water Resources Control Board, will serve as the distinguished guest speaker. Optional Plant tour following program. ORANGE COUNTY SANITATION DISTRICTStateof OC San Friday, October 17, 2025 11 a.m. - 1 p.m. LOCATION: OC San Headquarters 18480 Bandilier Circle, Fountain Valley, CA FOR MORE INFORMATION OR QUESTIONS, EMAIL US AT FORINFORMATION@OCSAN.GOV. Event is free, registration is required. Lunch and Networking Call Meeting to Order Board Chair, Ryan Gallagher Welcome and State of OC San Board Chair, Ryan Gallagher Guest Speaker Joaquin Esquivel, State Water Resources Control Board Adjourn Meeting Board Chair, Ryan Gallagher Plant tour immediately following the event Friday, October 17, 202511 a.m. - 1 p.m. P R O G R A M Luncheon State of OC San SCAN HERE To view the Fiscal Year 2024/25 OC San Annual Report Invitation Program Luncheon State of OC San Welcome Luncheon State of OC San SCAN HERE to view the Fiscal Year 24/25 OC San Annual Report Signage 22 Pipe Display EXTERNAL PROJECTSEnvironmental Design 23 Pipe Display Placards EXTERNAL PROJECTSEnvironmental Design 24 INTERNAL PROJECTS 25 INTERNAL PROJECTSPipeline - Employee Newsletter YOUR SOURCE FOR OC SAN NEWS AND INFORMATION September/ September/ October2024 Travel Through Time ...........................P2Under Construction .............................P5Department Profile ..............................P6Shining Stars ..........................................P12Community Connections ................P14State of OC San .....................................P15Health Fair ...............................................P15 The Best Of OC San ............................P16Celebrating Years Of Service ........P18And The Award Goes To .................P20Cold Weather Care ............................P22Welcome To The Team....................P23On The Move .........................................P24Service Awards ....................................P24 Inside this Issue: YOUR SOURCE FOR OC SAN NEWS AND INFORMATION January/February2025 YOUR SOURCE FOR OC SAN NEWS AND INFORMATION July/August2024 Inside this Issue: Summer Memories ...............................P2Under Construction .............................P4Department Profile ..............................P6New EMT Member ..............................P10Two Year Budget .................................P12GM’s Year End Report .......................P13 Goodbye Nerissa .................................P14The Best Of OC San ............................P16Celebrating Years Of Service ........P18And The Award Goes To .................P20Welcome To The Team....................P23On The Move .........................................P24 SummerSummerEndless 26 INTERNAL PROJECTSPipeline - Employee Newsletter YOUR SOURCE FOR OC SAN NEWS AND INFORMATION NOVEMBER/DECEMBER2025 YOUR SOURCE FOR OC SAN NEWS AND INFORMATION JULY/AUGUST2025 This year’s Take Your kid to Work daY was the biggest one yet! On Wednesday, July 30, OC San proudly welcomed over 200 children to our Headquarters for a fun-filled and educational day. YOUR SOURCE FOR OC SAN NEWS AND INFORMATION MARCH/APRIL2026 Gold Award: Erika Rizk, Plant Operator (Div. 830) — Control Center Drawing Read more on page 15.Erika R. GOLDWINNER EMPLOYEEART CONTEST 27 INTERNAL PROJECTSEvent Branding Logo Certificate Picture Backdrop Table Tent 28 Logo and Background Graphic INTERNAL PROJECTSEvent Branding 29 Signage Event Map INTERNAL PROJECTSEvent Branding 30 Headquarters Lobby Digital Display Photo Booth Frame Giveaway - Pencil Pouch INTERNAL PROJECTSEvent Branding 31 Er i k a R . OC S  n P   n t N o . 1 Co n t r o  C e n t e r GO L D WI N N E R EM P L O Y E E AR T C O N T E S T S   Y   L   F  O S  Et i T . R g B    R e m o v   SI L V E R WI N N E R EM P L O Y E E AR T C O N T E S T S   Y   L   F  O S  Lourdes L. EMPLOYEEART CONTEST OC Sn Pnt No. 1Tricking Fiter BRONZEWINNER SYL FO S Erika R. OC Sn Pnt No. 1Contro Center GOLDWINNER EMPLOYEEART CONTESTSYL FO S Eti T. Rg B Remov SILVERWINNER EMPLOYEEART CONTESTSYL FO S Lo u r d e s L . EM P L O Y E E AR T C O N T E S T OC S  n P   n t N o . 1 Tr i c k  i n g F i  t e r BR O N Z E WI N N E R S   Y   L   F  O S  Erika R. OC Sn Pnt No. 1Contro Center GOLDWINNER EMPLOYEEART CONTESTSYL FO S Eti T. Rg B Remov SILVERWINNER EMPLOYEEART CONTESTSYL FO S Lo u r d e s L . EM P L O Y E E AR T C O N T E S T OC S  n P   n t N o . 1 Tri c k  i n g F i  t e r BR O N Z E WI N N E R S   Y   L   F  O S  ART CONTEST SYL FO S BRONZE WINNER LourdesLuna ART CONTEST SYL FO S SILVER WINNER Eti Taula ART CONTEST SYL FO S GOLD WINNER ErikaRizk Get creative and showcase the often-unseen beauty of our infrastructure and operations. From pipes and pumps to clarifiers and digesters, this contest is all about highlighting the pride, creativity, and craftsmanship behind the work we do every day. SYL FO S AR T C O N T E S T SUBMISSION PERIODFEB. 9-20Visit The San Box formore information. A-Frame Certificates Artwork Placards INTERNAL PROJECTSEvent Branding 32 HolidayLuncheon SAVE THE DATE                              Holiday Table Tent Signage Bridge Banner INTERNAL PROJECTSEvent Branding 33 INTERNAL PROJECTSEnvironmental Design Wall Graphic 34 BRANDING PROJECTSPromotional Items 35 2024 Asset Management Plan Program Year 2023 - 2024 Marine Monitoring ANNUAL REPORT EXTERNAL PROJECTSReports Cover Designs 36 2025 AssetManagement Plan 2026 BOARD OF DIRECTORS’Guide toBusiness EXTERNAL PROJECTSReports Cover Designs 37 Investment Policy Adopted December 17, 2025 2025 Marine Monitoring ANNUAL REPORT Program Year 2024 - 2025 EXTERNAL PROJECTSReports Cover Designs 38 2023/24 A N N U A L R E P O R T O r a n g e C o u n t y S a n i t a t i o n D i s t r i c t Years of Environmental Excellence CAPITAL IMPROVEMENT PROGRAM EXTERNAL PROJECTSReports Cover Designs 39 20 2 5 BIOSOLIDS MANAGEMENT COMPLIANCE REPORT EPA 40 CFR Part 503 Orange County Sanitation District BudgetSummary Orange County Sanitation District, California 26-27FISCAL YEARS 27-28 EXTERNAL PROJECTSFull Report Designs 40 Driven by our Mission, Powered by Innovation A N N U A L R E P O R T         EXTERNAL PROJECTSFull Report Designs Page left intentionally blank 42 07/2026 PUBLIC AFFAIRS OFFICE18480 Bandilier Circle | Fountain Valley, CA 92708 www.ocsan.gov | forinformation@ocsan.gov | Follow us on social media @OCSanDistrict 7/1/2026 1 Public Affairs Strategic Plan FY 2024-26 Summary Presented by: Jennifer Cabral, Director of Communications Daisy Covarrubias, Public Affairs Supervisor Administration Committee July 8, 2026 Public Affairs Team 2 *Pr. Staff Analyst and VIPS 1 2 7/1/2026 2 •Employee Engagement •Industry Experts •Media Relations •Agency Branding and Messaging •Educational Outreach •Capital and Maintenance Outreach •Legislative Affairs What We Do 3 •Grant Coordination •Local Government Affairs •Crisis Management •General Manager Support What We Do 4 3 4 7/1/2026 3 Highlights from Fiscal Years 2024-2026 5 Overall, the District does an excellent job of communicating with employees… Building on Success 6 5 6 7/1/2026 4 New Initiatives 7 More New Initiatives 8 7 8 7/1/2026 5 OC San’s New Video Library 9 •FY 2026-2028 Public Affairs Strategic Plan •Building Trust •Strengthening Partnerships •Advancing OC San's Mission Looking Ahead 10 9 10 7/1/2026 6 Recommend to the Board of Directors to: Receive and file the Public Affairs Strategic Plan for Fiscal Years 2024 –2026 Summary. Recommendation 11 11 ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5019 Agenda Date:7/22/2026 Agenda Item No:14. FROM:Robert Thompson, General Manager Originator: Jennifer Cabral, Director of Communications SUBJECT: LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF JUNE 2026 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the Legislative Affairs Update for the month of June 2026. BACKGROUND The Orange County Sanitation District’s (OC San)legislative affairs program includes advocating for policy and legislative priorities,sponsoring legislation (where appropriate),and seeking local,state, and federal funding for projects and programs. RELEVANT STANDARDS ·Maintain influential legislative advocacy and a public outreach program ·Build brand, trust, and support with policy makers and community leaders ·Maintain collaborative and cooperative relationships with regulators,stakeholders,and neighboring communities PROBLEM Without ongoing legislative engagement,elected officials may not be aware of OC San’s mission, programs,and projects,or how proposed legislation may impact OC San operations and infrastructure planning. PROPOSED SOLUTION Continue to work with Local,State,and Federal officials to advocate for OC San’s interests and help identify,monitor,and respond to legislation and grant opportunities that benefit OC San,the wastewater industry,and the community.To strengthen relationship building efforts,OC San will continue to engage elected officials through facility tours,one-on-one meetings,and outreach trips to Washington D.C. and Sacramento. Orange County Sanitation District Printed on 7/13/2026Page 1 of 2 powered by Legistar™ File #:2026-5019 Agenda Date:7/22/2026 Agenda Item No:14. RAMIFICATIONS OF NOT TAKING ACTION If OC San does not actively engage with Local,State,and Federal elected officials,legislation could be enacted that adversely impacts OC San and the wastewater industry.Additionally,a lack of engagement may result in missed funding opportunities. ADDITIONAL INFORMATION Activities in June: ·On June 12,staff participated in the California Association of Sanitation Agencies (CASA) State Legislative Committee to discuss proposed and current legislation,including potential impacts on OC San and other wastewater agencies. Upcoming Activities in July: ·OC San staff,subject matter experts,and lobbyists have started the process of updating the 2027 OC San Legislative and Regulatory Plan and will continue throughout the next couple of months.The Plan is a guiding document that is presented annually to the Board of Directors for adoption. Staff will present a draft plan to the Administration Committee in October 2026. ·OC San staff and lobbyists will continue their work on the September 18 State of OC San luncheon event,which is slated to take place at OC San Headquarters.Invitations will go out in August. PRIOR COMMITTEE/BOARD ACTIONS N/A CEQA N/A FINANCIAL CONSIDERATIONS All items mentioned are included in OC San’s FY 2026-27 Adopted Budget. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Federal Legislative Update ·Federal Matrix ·State Legislative Update ·State Matrix ·Local Legislative Update ·Presentation Orange County Sanitation District Printed on 7/13/2026Page 2 of 2 powered by Legistar™ ENS Resources, Inc. 1367 Connecticut Avenue N.W./Suite 310 Washington, D.C. 20036 / Telephone (202) 466-3755 www.ensresources.com TO: Orange County Sanitation District FROM: Eric Sapirstein DATE: June 19, 2026 SUBJECT: Washington Update Over the past month, congressional and U.S. Environmental Protection Agency (USEPA) activities have advanced several policy and regulatory priorities of interest to OC San. The USEPA Administrator Lee Zeldin held a joint briefing with the Department of Health and Human Services Secretary RFK, Jr. to outline a commitment to address PFAS impacts on public health and the environment. In tandem with the briefing, the USEPA published two proposed per- and polyfluoroalkyl substances (PFAS) rules. The first would extend the water agency treatment compliance deadline for perfluorooctanoic acid (PFOA) and perfluorooctane sulfonic acid (PFOS) maximum contaminant levels to 2031 from the current 2029 deadline. The extension would be based on a review of a water agency’s circumstances. The second rule would rescind drinking water standards for four additional PFAS compounds and GEN-X (GenX is a trade name for a synthetic chemical belonging to PFAS class. In Congress, progress on the Fiscal Year 2027 appropriations occurred in the House as the Committee on Appropriations approved USEPA’s budget, clearing the bill for House floor action later this spring. As approved on a party line vote EPA would be cut by approximately 20 percent below the FY 2026 enacted level. Separately, the U.S. Government Accountability Office (GAO) testified before the House Committee on Science, Space, and Technology on growing concerns over cybersecurity threats to the water sector. Lastly, efforts to legislate passive receivers liability protections for the water sector related to EPA’s designation of PFAS under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) continues. Members on the House and Senate committees with jurisdiction over CERCLA are attempting to develop a passive receivers liability exemption. If successful, agencies like OC San, would be protected from frivolous litigation from Potentially Responsible Parties that seek to shift PFAS clean-up burdens on to the public simply because an agency had to treat the PFAS contaminated wastewaters. ENS Resources, Inc. 1367 Connecticut Avenue N.W./Suite 310 Washington, D.C. 20036 / Telephone (202) 466-3755 www.ensresources.com The following summarizes key issues of interest. FY 2027 Appropriations: EPA Water Infrastructure Programs The House Committee on Appropriations approved EPA’s FY27 spending bill. The bill would cut EPA by approximately $1.8 billion (twenty percent) below the enacted FY26 level. Despite the overall EPA reduction, the bill retains grant funding flowing directly to states and tribes for water infrastructure and continues Community Project Funding for EPA Clean Water and Drinking Water State Revolving Fund (SRF) projects. Although the overall SRF account would be reduced by approximately $100 million, the committee agreed to provide $2 billion for the FY27 SRF Capitalization Grants Account. However, as part of the committee action, the SRF would fund Community Project Requests providing $506 million for water and $526 million wastewater projects, reducing the SRF capitalization grants by like amounts. Importance of Committee Action While OC San does not rely upon the SRF, the continued funding maintains the federal partnership to support communities meet federal water quality mandates. For California, if the funding level is enacted, the State would receive approximately $72 million in SRF Capitalization Grant assistance in the coming fiscal year. EPA Preparing to Issue Biosolids Land Application Guidance and Effluent Limitation Guidelines for Industry Related to PFAS The Office of Water is expected to issue guidance to the States on how to set standards to address PFAS in biosolids. The guidance reportedly will provide for a tiered approach to set acceptable levels of PFAS that may be present in biosolids and establish a scientifically defensible approach to managing continued land application of biosolids while protecting public health and the environment. The EPA is also preparing to issue long delayed effluent limitation guidelines (ELG’s)that would require industrial dischargers to treat for PFAS before discharging effluent. The expectation is the ELG’s would lead to source control of PFAS and reduce the presence in wastewaters that agencies like OC San must treat. Importance of Guidance and ELG’s EPA’s anticipated actions are important for two reasons. First, the biosolids land application guidance will bring clarity on how to assess risk assessments related to land application. The original draft Risk Assessment Model that was issued in the final two weeks of the Biden Administration received more than 24,000 public comments. Many of the comments cited the model’s deficiencies and lack of sound science upon which biosolids management decisions would be made. The issuance of ELG’s will for the first time put in place standards to reduce PFAS wastewater discharges from industry. When finalized, the ELG’s should support efforts to reduce the burden and costs imposed on wastewater agencies to treat these sources of PFAS. ENS Resources, Inc. 1367 Connecticut Avenue N.W./Suite 310 Washington, D.C. 20036 / Telephone (202) 466-3755 www.ensresources.com EPA PFAS Drinking Water Rule: Proposed Rescission and Compliance Extension On May 18, the EPA announced two proposed rules under the Safe Drinking Water Act related to PFAS in drinking water. In taking this action, EPA stated that it would re-examine the need to regulate the PFAS compounds once the rules are finalized. The first proposed rule would roll back or rescind the drinking water maximum contaminant levels (MCLs) for four PFAS compounds established under the Biden Administration’s April 2024 National Primary Drinking Water Regulation perfluorohexane sulfonic acid (PFHxS), perfluorononanoic acid (PFNA), hexafluoropropylene oxide dimer acid (HFPO-DA, commonly known as GenX). As part of this action, the agency would rescind the Hazard Mixture Index (Index)that would have set a treatment standard for any mixture of these three PFAS and other future chemicals. EPA stated that the prior rule failed to follow the statutory requirements of the Safe Drinking Water Act in establishing the standards. Under the law, the agency must regulate on a chemical by chemical basis and not the novel Index approach that the Biden EPA relied upon to issue the MCL. The second proposed rule upholds the existing 4 parts per trillion MCL for PFOA and PFOS that EPA also issued under the Biden EPA. However, EPA is now proposing to allow public water systems to apply for a two-year compliance extension, extending the compliance deadline from 2029 to 2031. Regardless of the court challenge EPA has scheduled a virtual public hearing on July 7, 2026, to receive verbal comments. The public hearing will address both rules. The deadline to pre-register to provide verbal comment is July 1, 2026. Importance of EPA Actions EPA’s decision to rescind the standards related to additional PFAS chemicals is important. It recognizes the agency failed to follow the law in relying upon a “hazard mixture index” approach to set a treatment standard. If the rescission withstands expected court challenges, it will require documented science on the public health threats from each chemical. The other action includes reaffirming the 4 parts per trillion MCL for PFOS and PFOA, to allow for an extended compliance date of an additional two years is important because if a water agency can make a compelling case for additional time, it would help to address affordability impacts. Water Sector Cybersecurity: Congressional Hearing and GAO Testimony On May 21, 2026, the Government Accountability Office (GAO) testified before the House Committee on Science, Space, and Technology’s Subcommittee on the Environment at a hearing titled “Research-Driven Resilience: Applying Science to Secure U.S. Water Systems from Cyber Threats.” GAO testified that threat actors, including state-sponsored hackers and criminal groups, are increasingly capable of cyberattacks on water systems, in part because operational technologies that control valves, pumps, and other physical infrastructure are increasingly connected to internet-enabled devices. GAO also noted that gaps in EPA’s capacity to assess and support water sector cybersecurity needs. GAO warned directly in its testimony that the proposed reductions to the Department of Homeland Security’s Cybersecurity and Infrastructure Security Agency budget may limit the federal government’s ability to support water and wastewater system resilience and cybersecurity efforts. ENS Resources, Inc. 1367 Connecticut Avenue N.W./Suite 310 Washington, D.C. 20036 / Telephone (202) 466-3755 www.ensresources.com Importance of GAO Testimony Water and wastewater agencies are facing growing cybersecurity requirements under the America’s Water Infrastructure Act, while federal resources that support threat assessment and remediation efforts face potential reductions. Recent GAO testimony underscored the water sector’s vulnerability to cyberattacks and the importance of maintaining robust cybersecurity defenses for critical infrastructure. As Senator Schiff develops water sector legislation, there is an opportunity to provide targeted funding and resources that would help utilities meet federal requirements and strengthen cybersecurity resilience. Copy of OC San Federal Legislative Update July 2026 FEDERAL - 119TH CONGRESS S. 4603 Golden Mussel Eradication and Control Act of 2026 No Priority No Stance Summary: S. 4603 would create a pilot program to investigate the availability of control and eradication technologies to address the growing threats from the Golden Mussel. A task force would be created to develop the demonstration program that would conduct R&D into impacts upon fisheries, water quality, and ecosystems. The task force would also support development of control and eradication methods and plans to address impacts upon public infrastructure among other matters. The program would be targeted to Sacramento-San Joaquin Delta and other waters as determined by the task force. Introduced: 05/20/2026 Sponsor: Sen. Adam Schiff CA Latest Actions: 05/20/2026 - Read twice and referred to the Committee on Environment and Public Works. 05/20/2026 - Introduced in Senate Committees: Senate Environment and Public Works Committee Why it matters: S.4603 is the Senate approach to the investigation and mitigation efforts to address the invasive Golden Mussel that threatens wastewater and water agencies' infrastructure. S. 4603 is similar to H.R.3717 introduced by Harder (D-CA). Outlook: Senate action on the bill is considered highly likely either as a stand alone measure or incorporation into a broader Water Resources Development Act or Clean Water/Safe Drinking Water Acts reauthorization. Why it matters: The legislation would provide important protection to water and wastewater agencies against third party litigation seeking to secure cost contributions for cleanups that involve PFAS contamination. Absent an explicit liability protection provision such agencies would be exposed to liability simply because an agency treated water and wastewater that contained PFAS chemicals and disposed of residuals and biosolids. Outlook: H.R. 1267 represents a placeholder bill to address the water sector's concerns over the potential liability created by USEPA's designation of PFAS as a hazardous substance under CERCLA. Both the House and Senate committees with jurisdiction over CERCLA have expressed interest in addressing PFAS liability. We expect that congressional action could later this summer on H.R. 1267 or other initiatives that would address nuisance litigation. FEDERAL - 119TH CONGRESS H.R. 1285 Water Infrastructure Subcontractor and Taxpayer Protection Act of 2025 No Priority No Stance Summary: H.R. 1285 would amend the Water Infrastructure Finance and Innovation Act of 2014. The key points: Payment and Performance Security Requirements: The bill establishes new requirements for payment and performance security for projects funded under the act. Project Funding: Ensure that projects financed through the Water Infrastructure Finance and Innovation Act have adequate financial safeguards. Introduced: 02/13/2025 Sponsor: Rep. Mike Bost IL-12 Latest Actions: 02/13/2025 - Referred to the Subcommittee on Water Resources and Environment. FEDERAL - 119TH CONGRESS H.R. 1267 Water Systems PFAS Liability Protection Act High Priority Support AI Summary: The Water Systems PFAS Liability Protection Act exempts water and wastewater treatment facilities from CERCLA liability for releases of certain perfluoroalkyl and polyfluoroalkyl substances, provided they comply with applicable laws and regulations. Introduced: 02/12/2025 Sponsor: Rep. Marie Gluesenkamp Perez WA-03 Latest Actions: 02/12/2025 - Referred to the Subcommittee on Water Resources and Environment. 02/12/2025 - Referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period … 02/12/2025 - Referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period … Committees: House Energy and Commerce Committee, House Transportation and Infrastructure Committee, House Transportation and Infrastructure Committee Water Resources and Environment Subcommittee 02/13/2025 - Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to b… 02/13/2025 - Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to b… Committees: House Energy and Commerce Committee, House Transportation and Infrastructure Committee, House Transportation and Infrastructure Committee Water Resources and Environment Subcommittee FEDERAL - 119TH CONGRESS S. 857 Water Conservation Rebate Tax Parity Act No Priority No Stance Summary: Amends federal tax law so that homeowners would not need to pay income tax when they receive rebates from water utilities for water conservation and water runoff management improvements. S. 857. Introduced: 03/05/2025 Sponsor: Sen. John Curtis UT Latest Actions: 03/05/2025 - Read twice and referred to the Committee on Finance. 03/05/2025 - Introduced in Senate Committees: Senate Finance Committee FEDERAL - 119TH CONGRESS H.R. 2269 WIPPES Act High Priority Support Summary: H.R. 2269 would direct the Federal Trade Commission to estabilsh federal "Do Not Flush" labeling requirements for nonflushable wet wipes packaging. The labeling requirements would be enacted one year after the bill's enactment. The bill mirrors California's state labeling law and is supported by clean water, industry, environmental advocates, and civil engineer stakeholders. Senate companion legislation is S. 1092. Introduced: 03/21/2025 Sponsor: Rep. Lisa McClain MI-09 Latest Actions: 06/24/2025 - Received in the Senate. 06/23/2025 - Motion to reconsider laid on the table Agreed to without objection. 06/23/2025 - On motion to suspend the rules and pass the bill Agreed to by voice vote. (text: CR H2852-2853) Committees: House Energy and Commerce Committee Why it matters: H.R. 2269 provides a source control solution to the problem of the flushing of nonflushable wipes that will reduce costs associated with fixing damaged treatment infrastructure for wastewater utilities. The labeling requirements compliment existing "Do Not Flush" labeling state law. Rep. Lou Correa is a co-sponsor. OC San continues to publicly support the effort and has sent support letters to the delegation this Congress. Outlook: Final passage of the WIPPES Act is anticipated with the House accepting the Senate passed version to avoid the need for a formal conference committee that would delay final enactment. (see S. 1092 below) FEDERAL - 119TH CONGRESS S. 1092 WIPPES Act High Priority Support Summary: S.1092 would direct the Federal Trade Commission to estabilsh federal "Do Not Flush" labeling requirements for nonflushable wet wipes packaging. The labeling requirements would be enacted one year after the bill's enactment. The bill mirrors California's state labeling law and is supported by clean water, industry, environmental advocates, and civil engineer stakeholders. House companion legislation is HR 2269. Introduced: 03/24/2025 Sponsor: Sen. Jeff Merkley OR Latest Actions: 03/24/2026 - Held at the desk. 03/24/2026 - Received in the House. 03/24/2026 - Message on Senate action sent to the House. Committees: Senate Commerce, Science and Transportation Committee Why it matters: S. 1092 provides a source control solution to the problem of the flushing of nonflushable wipes that will reduce costs associated with fixing damaged treatment infrastructure for wastewater utilities. The labeling requirements compliment existing "Do Not Flush" labeling state law. Senator Alex Padilla is an original co-sponsor. OC San continues to publicly support the effort and has sent support letters to the delegation this Congress. Outlook: S. 1092 passed the Seante by unanimous consent. The bill was referred to the House. House action to accept the Senate version of the WIPPES Act is anticipated. House acceptance of the Senate-passed version could occur in June/July. (See above) FEDERAL - 119TH CONGRESS H.R. 2344 Water ISAC Threat Protection Act No Priority No Stance Summary: Would establish a program to enhance the preparedness and resilience of drinking water and wastewater systems against various threats. The bill's primary focus is on safeguarding these critical utilities from risks such as natural disasters, cyberattacks, and other vulnerabilities that could disrupt essential water services. Introduced: 03/25/2025 Sponsor: Rep. Jan Schakowsky IL-09 Latest Actions: 03/25/2025 - Referred to the Subcommittee on Water Resources and Environment. 03/25/2025 - Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to b… 03/25/2025 - Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to b… Committees: House Energy and Commerce Committee, House Transportation and Infrastructure Committee, House Transportation and Infrastructure Committee Water Resources and Environment Subcommittee FEDERAL - 119TH CONGRESS S. 1118 Water Intelligence, Security, and Cyber Threat Protection Act of 2025 No Priority No Stance Summary: S. 1118 would provide funding and additional access for clean water and wastewater utilities to become members of the Water Information Sharing and Analysis Center (WaterISAC). The WaterISAC is a critical source of information and best practices for water systems to protect against, mitigate, and respond to threats. House Companion bill H.R. 2344. Endorsed by American Water Works Association, Association of Metropolitan Water Agencies, National Association of Clean Water Agencies, National Association of Water Companies, and Water Environment Federation. Introduced: 03/25/2025 Sponsor: Sen. Ed Markey MA Latest Actions: 03/25/2025 - Read twice and referred to the Committee on Environment and Public Works. 03/25/2025 - Introduced in Senate Committees: Senate Environment and Public Works Committee Why it matters: H.R. 3898 represents a comprehensive Clean Water Act permitting reform bill. Key provisions: • mandates 10 year NPDES permits • codifies exemption from WOTUS definition for wastewater and water storage facilities • expedites review and approval of section 404 permit applications (dredge and fill) • provides ten year general permits for dredge and fill activities with requirement for 2 year advanced notification if permit not to be renewed FEDERAL - 119TH CONGRESS H.R. 3184 PFAS Alternatives Act No Priority No Stance AI Summary: The bill establishes a research and training program to develop PFAS-free turnout gear for firefighters, supporting innovation and safer protective equipment through grants and partnerships. Introduced: 05/05/2025 Sponsor: Rep. Debbie Dingell MI-06 Latest Actions: 05/06/2025 - Referred to the Subcommittee on Water Resources and Environment. 05/05/2025 - Referred to the Committee on Science, Space, and Technology, and in addition to the Committee on Transportation and Infrastructure, for a… 05/05/2025 - Referred to the Committee on Science, Space, and Technology, and in addition to the Committee on Transportation and Infrastructure, for a… Committees: House Science, Space and Technology Committee, House Transportation and Infrastructure Committee, House Transportation and Infrastructure Committee Water Resources and Environment Subcommittee FEDERAL - 119TH CONGRESS H.R. 3898 PERMIT Act No Priority No Stance AI Summary: The PERMIT Act amends the Federal Water Pollution Control Act to streamline water quality standards, improve transparency in criteria development, reduce regulatory burdens, and enhance permitting efficiency for infrastructure and agricultural projects. Introduced: 06/11/2025 Sponsor: Rep. Mike Collins GA-10 Latest Actions: 12/15/2025 - Received in the Senate and Read twice and referred to the Committee on Environment and Public Works. 12/11/2025 - Motion to reconsider laid on the table Agreed to without objection. 12/11/2025 - On passage Passed by the Yeas and Nays: 221 - 205 (Roll no. 330). Committees: House Transportation and Infrastructure Committee, House Transportation and Infrastructure Committee Water Resources and Environment Subcommittee, Senate Environment and Public Works Committee • limits water quality certification reviews to project impacts on water quality (no down stream impacts or non-water quality related impacts) Outlook. H.R. 3898's provisions could be incorporated into a broader permitting reform bill that addresses both energy and environmental permit mandates. As of this writing, the Senate Committees on Environment and Public Works and Energy and Natural Resources are negotiating on a bipartisan measure that would enhance prospects of final passage of H.R. 3898's permit terms provisions. Why it matters: S. 3738 would extend the authorization of the expiring large water recycling projects ($500 million or greater) program. Authorized funding would be $450 million and the program would be extended until 2032. It would also modify the the Title XVI program increasing federal cost share to $50 million, providing $550 million funding authorization and extending program to 2032. A new program authorizing $250 million to support environmental and habitat restoration projects would be available to support the Great Salt Lake and other inland lakes (priority on Central Utah Project. Outlo0k: The legislation received a positive hearing before the Committee on Energy and Natural Resources. USBR testified positively on the bill. S. 3738 could become part of a larger western water resources bill later in the year. FEDERAL - 119TH CONGRESS S. 3738 MORE WATER Act No Priority No Stance AI Summary: The MORE WATER Act reauthorizes the large-scale water recycling and reuse program, establishes a Water Conveyance Improvement Program, and provides funding for projects that deliver water supply, safe drinking water for low-income communities, and environmental benefits. Introduced: 01/29/2026 Sponsor: Sen. Alex Padilla CA Latest Actions: 03/17/2026 - Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. 01/29/2026 - Read twice and referred to the Committee on Energy and Natural Resources. (Sponsor introductory remarks on measure: CR S380-381) 01/29/2026 - Introduced in Senate Committees: Senate Energy and Natural Resources Committee, Senate Energy and Natural Resources Committee Water and Power Subcommittee Why it matters: The legislation would increase the federal cost share cap for the WIFIA Program from the current 80% to 90% for projects that are located in areas of extreme drought, projects of national significance, or serves disadvantaged communities. By raising the federal cap for these categories of eligible projects, H.R. 7845 aims to help address concerns about Western water supplies resiliency due to prolonged drought conditions. Importantly, the bill does not change borrowers' obligations, payment plans, or interest rates under WIFIA. Outlook: H.R. 7845 has been referred to the Committee on Transportation and Infrastructure. While the issue of Western water supply security continues to be a focus for lawmakers in the 119th Congress, the committee is currently focused primarily on drafting and advancing the Water Resources Development Act of 2026 (WRDA) later this summer. As a result, committee consideration on H.R. 7845 will likely be delayed until the summer at the earliest. FEDERAL - 119TH CONGRESS H.R. 7845 DROUGHT Act of 2026 AI Summary: The DROUGHT Act of 2026 modifies the Water Infrastructure Finance and Innovation Act to limit federal assistance for drought-affected water projects to 90% of total project costs, prioritizing projects in severely drought-affected states or counties, low-income areas, or those providing significant public health, environmental, or water reliability benefits. Introduced: 03/05/2026 Sponsor: Rep. Scott Peters CA-50 Latest Actions: 03/06/2026 - Referred to the Subcommittee on Water Resources and Environment. 03/05/2026 - Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to b… 03/05/2026 - Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to b… Committees: House Energy and Commerce Committee, House Transportation and Infrastructure Committee, House Transportation and Infrastructure Committee Water Resources and Environment Subcommittee CALIFORNIA ADVOCACY • FEDERAL ADVOCACY • GRANT WRITING Sacramento • Washington, D.C. Northern California • Central • California • Southern California MONTHLY LEGISLATIVE UPDATE To: Orange County Sanitation District From Townsend Public Affairs Date: June 19, 2026 Subject: June 2026 Legislative Monthly Report STATE UPDATE May and June represent one of the most consequential periods in California’s legislative calendar, marked by major policy deadlines and the budget process. It serves as both the deadline for bills to pass their House of Origin and the point at which the Governor releases the annual "May Revise" budget proposal. It also precedes the constitutional deadline of June 15th by which the Legislature must pass a state budget. Under the provisions of Proposition 25, approved by voters in 2010, Members of the Legislature permanently forfeit their daily salaries for each day the budget remains overdue after June 15. As a result, it has become common practice for the Legislature to approve and transmit a framework budget to the Governor by the constitutional deadline, allowing negotiations on remaining details to continue. The budget approved on June 15 serves as a broad fiscal framework rather than a final spending plan. Following its passage, the Senate, Assembly, and Governor continue negotiations over outstanding policy and fiscal issues. Once an agreement is reached, the Governor must sign the finalized budget package before the start of the new fiscal year on July 1. Additional details and implementation provisions are then negotiated and enacted through a series of budget trailer bills throughout the remainder of the legislative session. As approved, the Legislature’s budget framework is projected to remain balanced through Fiscal Year 2027–28 and significantly reduces the state's long-term structural deficit to below $10 billion. The Legislature’s proposal includes $355.9 billion in total expenditures for Fiscal Year 2026–27, including: • $253 billion from the General Fund. • $36.5 billion in total reserves, including: o $4.5 billion in the Special Fund for Economic Uncertainties (Regular Reserve); o $15.1 billion in the Budget Stabilization Account (Rainy Day Fund); o $9.5 billion in the Proposition 98 Rainy Day Fund; and o $7.4 billion set aside for Fiscal Year 2027–28. Page 2 Revenue Proposals The Legislature’s budget framework also includes several revenue-related proposals, including: • Fair Share from Large Corporations o In response to federal funding reductions included in H.R. 1, the Legislature incorporated budget language requiring the Governor to present fully developed policy options by April 1, 2027, for holding large corporations accountable for a greater share of their employees’ healthcare costs. These options will be considered during the next budget cycle. Any implementation of such proposals would require subsequent legislative action. • A federally compliant Managed Care Organization tax; and • An expansion of the sales tax to certain prewritten software products. The software proposal would apply the state sales tax to many commonly used software subscriptions, including products such as Slack and Microsoft Office suites, beginning in January 2027. New revenue sources remain difficult to identify in periods of economic uncertainty. Voter sentiment appears cautious regarding additional taxation, as reflected in the number of local tax measures rejected during the June primary election. However, unlike local tax increases, the revenue proposals contained in the state budget do not require voter approval and may be enacted with a two-thirds vote of each house of the Legislature. Given the volatility of California’s revenue structure—particularly its dependence on capital gains and stock market performance—the Legislature and Governor are also discussing potential changes to the state’s reserve policies. Under current law, state leaders are constitutionally required to make annual deposits into the Budget Stabilization Account; however, the account balance may not exceed 10 percent of General Fund tax revenues. Policymakers are now considering whether that cap should be increased to allow the state to save more revenue during strong economic years and better prepare for future downturns. Because the reserve cap was established in the California Constitution, any change would require voter approval. Legislative leaders are currently considering a ballot measure for the November election that would authorize a higher reserve limit. To qualify such a measure for the ballot, lawmakers face a June 25 deadline to finalize the proposal. CAP AND INVEST Beyond the budget, one of the most significant developments this month was major regulatory changes to the state’s Cap-and-Invest Program. The California Air Resources Board (CARB) proposed and adopted sweeping changes to the program, despite it having been negotiated and codified in SB 840 last year. In 2024, CARB determined that it had underestimated the amount of greenhouse gas reductions required of regulated industries by approximately 118 million metric tons. Rather than requiring emitters to achieve those additional reductions, CARB adopted regulations that effectively provide the equivalent of 118 million metric tons in free allowances to regulated entities. Consequently, 118 million fewer allowances will be available for auction. Page 3 The implications of CARB’s Cap-and-Invest changes extend well beyond climate policy and could have significant consequences for water and sanitation infrastructure funding throughout California, including challenges for opportunities to include new funding for programs such as innovative biosolids management, of importance of OC San. This growing uncertainty places increased importance on other available state funding sources, particularly Proposition 4. As traditional funding streams come under pressure, Proposition 4 may represent one of the Legislature’s most significant remaining tools to support water infrastructure, drinking water reliability, groundwater sustainability, and climate resilience projects. Legislative leaders are expected to begin substantive discussions regarding Proposition 4 implementation following their return from Summer Recess in August, making the coming months particularly important for water agencies seeking clarity on future funding opportunities. While details of Proposition 4 are still outstanding, the Governor has asked the State Legislature to allocate $2.1 billion in funding, including $792 million for water-related programs and $326 million for clean energy programs. Unlike the Governor’s initial 2025-26 proposal, in general, the budget does not propose a multiyear spending plan for Proposition 4. The administration instead indicates that, in response to feedback from the Legislature, it would like to submit programmatic bond funding proposals on a year-by-year basis. Final details on funding and funding mechanisms, though, will be decided in August. TPA continues to advocate for funding opportunities that would benefit OC San. KEY STATE LEGISLATION The following summarizes key legislation that OC San has taken positions on: OC San staff and Townsend Public Affairs monitor current and upcoming legislation. Per the Page 4 Board approved Legislative and Regulatory Plan, OC San has submitted five position letters: Assembly Bill 1621 (Wilson) – Planning and Zoning Law: Housing Accountability Act Summary: AB 1621 proposes changes to the post-entitlement permitting process for housing development projects. The bill would limit building permit plan check reviews to two rounds, modify review timelines and related provisions, and restrict agencies from requiring changes during inspections that deviate from previously approved plans unless specified findings are met. Status: AB 1621 has been referred to the Assembly Housing Committee OC San Position: Oppose Unless Amended. Page 24, section K (H) of Legislative and Regulatory Plan Assembly Bill 2180 (Ward) - Proposition 218 Omnibus Implementation Act Summary: AB 2180 clarifies how local governments may demonstrate compliance with the constitutional requirement that fees do not exceed the proportional cost of service. The bill allows agencies to use any reasonable method to allocate service costs among parcels, supported by existing or reasonably estimated data. The bill is sponsored by ACWA. Status: AB 2180 has passed the Senate and will be heard next on the Senate Floor. OC San Position: Support. Page 24, section K (h) of the Legislative and Regulatory Plan Assembly Bill 2381 (Johnson) - Local Agency Public Construction Act: Municipal Water Districts: Sanitation Districts: Lowest Responsible Bidder Summary: AB 2381 amends the Local Agency Public Construction Act to update competitive bidding requirements for municipal water districts and sanitation districts. Specifically, the measure increases the threshold for public works contracts that must be awarded to the lowest responsive and responsible bidder from $35,000 to $220,000. Status: AB 2381 died in the Assembly and is not moving forward. OC San Position: Support. Page 23 section J (e) of the Legislative and Regulatory Plan and is consistent with previous bill concepts that TPA has discussed with OC San staff and the Board. Assembly Bill 2777 (ESTM Committee) – State Water Pollution Control Revolving Fund program: loans: water reuse Summary: AB 2777, sponsored by CASA and WateReuse, this bill would provide additional flexibility for the State Water Resources Control Board to modernize the Clean Water State Revolving Fund (CWSRF) loan program. The bill would authorize the state board to assess fees in place of an annual charge for financial assistance and would authorize the fees or annual charge to be assessed at any rate as permitted by federal law. Status: AB 2777 will be heard in the Senate Environmental Safety and Toxic Materials Committee on June 17. OC San Position: Support an industry coalition letter. Page 23, section D (A) and section E (c) of Page 5 the Legislative and Regulatory Plan. Senate Bill 1117 (Cervantes) - Accessory Dwelling Units and Junior Accessory Dwelling Units Summary: SB 1117 would restrict how local agencies calculate impact fees for accessory dwelling units (ADUs) by requiring that fees for units exceeding 750 square feet be based only on the portion of the unit above that threshold, rather than the entire unit. Status: SB 1117 has been referred to the Assembly Local Government Committee. OC San Position: Oppose Unless Amended. Page 24, section K (H) of Legislative and Regulatory Plan OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 35 Alvarez [D]This legislation, would exempt the adoption of regulations needed to effectuate or implement programs of the act from the requirements of the Administrative Procedure Act (APA). The bill would require a state entity that receives funding through Proposition 4 to administer a competitive grant program established using the Administrative Procedure Act exemption to do certain things, including develop draft project solicitation and evaluation guidelines and to submit those guidelines to the Secretary of the Natural Resources Agency, except as provided. The bill would require the Secretary of the Natural Resources Agency to post an electronic form of the guidelines submitted by a state entity and the subsequent verifications on the Natural Resources Agency’s internet website. Referred to Senate Appropriations Committee Watch Legislative and Regulatory Policies: Grant Funding – Oppose proposals placing further requirements on grant recipients that return low value for high administrative costs ACC-OC - NYC LOCC - Support CASA - Support CSDA - NYC ACWA - Support AB 634 Gonzalez [R]The legislation intends to add tianeptine to the Schedule I category of controlled substances, reflecting the highest level of legal restriction. This action is intended to limit the potential misuse and abuse of the substance by prohibiting its manufacture and sale unless explicitly allowed. The bill emphasizes the importance of this classification to curb the substance's availability and mitigate associated risks to public health. Referred to Senate Health and Senate Judiciary Committee Watch Legislative and Regulatory Policies Source Control – Support legislation, regulations, and funding assistance that would lead to decreased introduction of microplastics, and other contaminants of concern discharged into the sewer system. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC AB 643 Wilson [D]AB 643 mandates a 75 percent reduction in organic waste disposal to landfills by 2025 to combat methane emissions. The bill tasks the Department of Resources Recycling and Recovery, along with the State Air Resources Board, with formulating associated regulations. Local jurisdictions are empowered to utilize organic materials as agricultural soil amendments to meet these goals, provided they follow specific guidelines. This approach aims to enhance California's climate resilience through sustainable waste management practices. Referred to Senate Environmental Quality Committee Watch Legislative and Regulatory Policies: Special Districts – Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Watch CASA - Support in concept CSDA - Watch ACWA - NYC AB 748 Harabedian [D]AB 748 authorizes the development and use of preapproved single‑family and multifamily housing plans that local agencies may adopt to expedite housing approvals and reduce duplicative design review. The bill adds Section 65852.29 to the Government Code, allowing a property owner to build housing consistent with a jurisdiction’s preapproved plan without undergoing additional design review, provided the housing meets the criteria of the adopted plan. This aims to accelerate production of housing units while maintaining local standards for design and land use, reducing processing time and cost for both agencies and developers. The bill is intended to support increased housing supply and consistency in planning approaches across jurisdictions. Referred to Senate Local Government and Senate Housing Watch Legislative and Regulatory Policies: Housing & Infrastructure Planning – Support statewide efforts to improve housing production and planning efficiency while protecting local infrastructure planning authority and avoiding unfunded mandates. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC AB 1198 Haney [D]Beginning July 1, 2027, changes in prevailing wages by the Director of Industrial Relations will affect contracts awarded or announced after this date. Affected parties can request a review within 20 days, with a final decision issued within 20 days thereafter. Certain housing projects are exempt from these updates. Referred to Senate Appropriations Committee Watch Legislative and Regulatory Policies: Special Districts – Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Oppose CASA - Watch CSDA - NYC ACWA - NYC AB 1337 Ward [D]Gut and amended on June 1. AB 1337 would significantly revise the Information Practices Act of 1977 by removing the exemption for local agencies, expanding the definition of personal information, strengthening notice and conduct requirements, broadening limits on disclosure, and adding discipline and criminal penalties for certain violations. Referred to Senate Privacy, Digital Technologies, and Consumer Protection Committee Watch Local Government - Oppose state mandates, regulations, or legislation that set, alter, or otherwise modify the governance structure of special districts, joint powers authorities, or other local government entities. ACC-OC - NYC LOCC - Oppose CASA - Oppose CSDA - NYC ACWA - NYC AB 1383 McKinnor [D]AB 1383 revises the pensionable compensation limits for public retirement systems in accordance with federal guidelines starting January 1, 2027. It introduces new retirement formulas for safety members, allowing for collective bargaining agreements to adjust these formulas. This bill supports the alignment of state retirement benefits with federal standards and facilitates negotiation over pension terms. Referred to Senate Labor, Public Employment, and Retirement Committee Watch Legislative and Regulatory Policies: Labor Relations/Human Resources – Oppose any measure that imposes upon local government mandated employee benefits that are more properly decided at the local bargaining table. ACC-OC - NYC LOCC - Oppose CASA - NYC CSDA - NYC ACWA - NYC AB 1617 Alanis [R]AB 1617 requires public agencies and contractors handling household hazardous waste to submit the Form 303 Household Hazardous Waste Collection Report annually for the prior calendar year, aligning the reporting period with the calendar year. This shift aims to improve the consistency and accuracy of hazardous waste tracking. Referred to Senate Environmental Quality Committee Watch Legislative and Regulatory Policies: Biosolids, Organics, and Biogas – Limit redundant reporting requirements on organics, recyclable material, and solid waste. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC Proposed Legislation 2026 High Priority OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 1621 Wilson [D]AB 1621 aims to streamline and speed up the post-approval (postentitlement) permitting process for housing projects by setting clearer rules, firm timelines, and limits on agency reviews. Recent amendments strengthen the bill by capping plan check rounds, shortening appeal timelines, restricting new or changing requirements, and tying violations of these rules to the Housing Accountability Act, making it easier to hold local agencies accountable for delays or noncompliance. Referred to Senate Housing Committee Oppose Unless Amended Legislative and Regulatory Policies: Housing & Local Agency Authority – Monitor and assess legislation that affects housing development processes and ensure local agency discretion is preserved in infrastructure planning and project implementation. ACC‑OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC AB 1710 Carrilo [D]AB 1710 redefines the criteria for "ordinances, policies, and standards" within housing development, adding materials, requirements, and standards imposed by other public agencies. It mandates compliance with existing plans and standards at the time of a preliminary application. The bill aligns with the Permit Streamlining Act, requiring projects considered for housing developments or emergency shelters to meet consistency and compliance evaluations. This bill enforces a state-mandated local program impacting all cities, including charter cities, and affects provisions for mandated cost reimbursements to local agencies. Referred to Senate Housing Committee and Senate Local Government Committee Watch Legislative and Regulatory Policies: Special Districts – Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Not Favor Unless Amended AB 1729 Lee [D]AB 1729 revises existing telecommuting provisions by introducing the term "telework" and mandates the Department of General Services to create a dashboard documenting the benefits and savings of state telework programs. Each state agency must evaluate its telework program every 10 years to ensure alignment with operational needs and workforce goals. This bill is labeled an urgency statute for immediate effect and only impacts state agencies. Referred to Senate Labor, Public Employment, and Retirement Committee and Senate Government Organization Committee Watch Legislative and Regulatory Policies: Special Districts – Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC AB 1772 Papan [D]AB 1772 aims to address and prevent the proliferation of aquatic invasive species, specifically the golden mussel, within California's water systems. This legislation intends to help safeguard the state's biodiversity and maintain ecological balance by implementing measures to monitor, report, and control the spread of these species in waterbodies and infrastructure systems. Referred to Senate Natural Resources and Water Committee Watch Legislative and Regulatory Policies: Water Quality & Ecosystem Protection – Support measures that control invasive species and protect California water systems. ACC-OC - NYC LOCC - NYC CASA - Support CSDA - NYC ACWA - SIA AB 1777 Garcia [D]AB 1777 would amend the Health and Safety Code to explicitly authorize the California Air Resources Board (CARB) to adopt regulations to reduce or mitigate emissions from indirect sources of air pollution, such as facilities, land uses, and activities that attract mobile emission sources like trucks, trains, and other vehicles. The bill clarifies that CARB can take this action when necessary to achieve ambient air quality standards required under federal law, expanding the agency’s authority beyond current direct vehicle emissions regulation. It aims to fill gaps where regional indirect source rules have been adopted locally but no consistent statewide mechanism exists to reduce pollution from high‑traffic indirect sources. On the Assembly Floor. Watch Legislative and Regulatory Policies: Air Quality & Environmental Protection – Support measures that strengthen air quality protections while minimizing undue regulatory or operational impact on local agencies. ACC‑OC - NYC LOCC - Watch CASA - NYC CSDA - NYC ACWA - NYC AB 1821 Pacheco [D]AB 1821 allows agencies to charge fees for time spent searching for public records beyond certain thresholds and updates response timelines to business days. Recent amendments refine the fee structure, clarify exemptions, and adjust response and extension periods. Referred to Senate Judiciary Committee Watch Legislative and Regulatory Policies: Public Transparency and Governance – Support policies that promote transparency and accountability in public agency operations while ensuring administrative requirements remain reasonable for local agencies. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC AB 1838 Berman [D]AB 1838 requires contractors bidding on public works projects to disclose any past wage-and- hour violations and demonstrate corrective actions. Recent amendments clarify disclosure requirements, documentation standards, and allow disqualification for noncompliance. Referred to Senate Local Government and Labor, Public Employment, and Retirement Committee Watch Legislative and Regulatory Policies: Public Contracting Transparency – Support policies that enhance transparency and accountability in public contracting while ensuring competitive and equitable procurement processes. ACC‑OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC AB 1898 Schultz [D]This legislation mandates that employers must inform employees about the use of AI tools in decisions affecting employment and worker surveillance activities.Notifications must specify the impacted employment decisions,and employers are required to maintain an updated list of AI tools used,which should be provided annually to employees.Enforcement includes penalties for non-compliance,reviewable through the Labor Commissioner or via civil action by affected workers. Dead Watch Guiding Priorities: Oppose redundant regulatory and legislative requirements that impose excessive limitations on effective operations. ACC‑OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 1997 Lee [D]AB 1997 requires a lead agency to approve or disapprove a housing development project where 90% of the units are affordable to very low or extremely low income households within 30 days of certifying an environmental impact report (EIR), and establishes a working group to make recommendations on the most effective ways to expedite the development of housing. Referred to Senate Local Government and Housing Committee Watch Legislative and Regulatory Policies: Local Agency Authority & Infrastructure – Support policies that affirm local control and clarity in agency operations affecting infrastructure development and system management. ACC‑OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Watch AB 2013 Bennett [D]AB 2013 requires specified community water systems located in high or very high fire risk areas to provide an annex to their disaster preparedness plans that includes specified information relating to system preparedness and resiliency during a wildfire. Dead Watch Legislative and Regulatory Policies: Disaster Preparedness – Support legislation that improves emergency preparedness and infrastructure resilience to protect critical water and wastewater services during disasters. ACC-OC - NYC LOCC - NYC CASA - Support CSDA - NYC ACWA - OUA AB 2026 Aguiar-Curry [D]AB 2026 expands and streamlines the process for diverting flood flows for groundwater recharge by broadening eligibility, expediting permitting, and exempting certain projects from CEQA. Recent amendments further expand the definition of flood flows, remove prior sunset limits, allow private entities to participate with groundwater agencies, and establish clearer permitting timelines and criteria. Referred to Senate Natural Resources and Water Committee and Senate Environmental Quality Committee Watch Legislative and Regulatory Policies: Water Supply and Resource Management – Support policies that improve water supply reliability and sustainable groundwater management across California. ACC-OC - NYC LOCC - NYC CASA - Support CSDA - NYC ACWA - Support AB 2125 Bennett [D]AB 2125 enhances the requirements imposed upon a plaintiff when filing a notice of completion of the mailing when conducting the specialized service of process provisions utilized in comprehensive groundwater adjudications. Referred to Senate Natural Resources and Water Committee Watch Legislative and Regulatory Policies: Water Resources Administration – Support policies that improve transparency and accountability in water rights and groundwater basin management. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Watch AB 2127 Johnson [D]AB 2127 prevents local governments from prohibiting the construction of new accessory dwelling units (ADUs) in an area solely because the lots are served by private sewage disposal systems. Referred to Senate Housing Committee Watch Legislative and Regulatory Policies: Regulatory Reporting & Transparency – Oppose proposals that create redundant reporting requirements that do not yield commensurate public benefit and impose unnecessary administrative burden on local agencies. ACC‑OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC AB 2180 Ward [D]AB 2180 updates the Proposition 218 Omnibus Implementation Act by clarifying that local agencies can use any reasonable method to show that property-related fees reflect the cost of service, rather than needing exact calculations for each parcel. It also confirms that water and sewer agencies can use uniform or tiered rates based on customer characteristics, and gives agencies flexibility to allocate costs within those tiers using reasonable approaches, as long as rates do not exceed the cost of providing service. On Senate Floor Support Legislative and Regulatory Policies: Local Agency Authority – Support policies that protect local agencies’ ability to set rates and fees necessary to provide essential wastewater and water services. ACC-OC - NYC LOCC - Support CASA - NYC CSDA - NYC ACWA - Support/Sponsor AB 2381 Johnson [D]AB 2381, introduced by Assembly Member Natasha Johnson, aims to amend the Local Agency Public Construction Act to increase the threshold for contracts awarded by municipal water districts and sanitation districts to the lowest responsible bidder from $35,000 to $220,000. The bill mandates the Controller to adjust this amount annually to reflect the percentage change in the Engineering News-Record Construction Cost Index and publish the adjusted amount on its internet website. Dead Support Legislative and Regulatory Policies: Public Contracting – Procurement & Fair Practices – Support fair and effective public contracting standards that enhance local agency competitiveness while preserving transparency and accountability. ACC‑OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC AB 2447 Bauer-Kahan [D]AB 2447 creates the Nitrogen Pollution Reduction Act.  Requires the State Water Resources Control Board (State Water Board) to require the Regional Water Quality Control Boards (Regional Water Boards) to update the Irrigated Lands Regulatory Program (ILRP) in order to reduce nitrogen waste discharges from commercial irrigated agricultural lands so that by January 1, 2030, those lands do not cause or contribute to exceedances of the maximum contaminant level (MCL) for nitrate, or exceedances of a water quality objective or total maximum daily load (TMDL) for nitrate. Dead Watch Legislative and Regulatory Policies: Water Quality & Ecosystem Protection – Support policies promoting nutrient management, water quality, and sustainable agriculture. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Oppose AB 2568 Johnson [D]AB 2568 reduces the maximum number of days water district board members may be compensated each month, from 20 days to 15 days. Recent amendments clarify this limit by revising prior proposed changes to board compensation caps. Referred to Senate Local Government Committee Watch Legislative and Regulatory Policies: Governance & Compensation – Support policies aligning compensation with board responsibilities. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Favor AB 2630 Bennett [D]AB 2630 requires the State Water Resources Control Board to continue adopting water diversion measurement and reporting regulations as emergency regulations through January 1, 2032. Recent amendments extend this requirement and maintain CEQA exemptions for those regulations. Dead Watch Legislative and Regulatory Policies: Water Resources Administration – Support policies that streamline water regulation and protect water supply reliability. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Oppose OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 2656 Petrie-Norris [D]AB 2656 requires a public employer shall provide a recognized employee organization no less than 45 days’ written notice before taking an action to develop, purchase, implement, or utilize any generative artificial intelligence to perform a service that is within the scope of work of the job classification represented by the recognized employee organization. Referred to Senate Labor, Public Employment, and Retirement Committee and Senate Privacy, Digital Technologies, and Consumer Protection Committee Watch Guiding Priorities: Oppose redundant regulatory and legislative requirements that impose excessive limitations on effective operations. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - Oppose ACWA - NYC AB 2777 Environmental Safety and Toxic Materials [Committee] AB 2777 authorizes the State Water Resources Control Board (State Water Board), when administering loans under the Clean Water State Revolving Fund (CWSRF), to assess a fee instead of interest (also known as fee in lieu of interest) for financial assistance services rendered under the CWSRF, and makes a technical change to recently enacted legislation dealing with recycled water. Referred to Senate Environmental Quality Committee Support Legislative and Regulatory Policies: Water Quality & Funding – Support policies promoting accountability in water quality financing. ACC-OC - NYC LOCC - NYC CASA - Sponsor CSDA - NYC ACWA -Favor SB 342 Umberg [D]SB 342 revises the Contractors State License Law, enabling contractors to claim compensation for work if properly licensed during contract execution, even if unlicensed at other times. It allows clients to recover payments made to unlicensed contractors based on the period the contractor was unlicensed. At the Assembly Desk waiting assignment Watch Legislative and Regulatory Policies: Public Contracting – Support legislation that protects local agency contracting integrity. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC SB 899 Grove [D]SB 899 requires the Wildfire and Forest Resilience Task Force to coordinate with health agencies to evaluate the health impacts of severe wildfire smoke by July 1, 2028, utilizing existing data. The findings will guide the enhancement of health outcomes in the Wildfire Resilience Action Plan and allow for independent consultancy contracts as necessary. Referred to Assembly Appropriations Committee Watch Legislative and Regulatory Policies: Disaster Preparedness – Support policies that improve wildfire resilience and public health outcomes. ACC-OC - NYC LOCC - Support CASA - NYC CSDA - NYC ACWA - Support/Sponsor SB 951 Reyes [D]SB 951 establishes the California Worker Technological Displacement Act, requiring employers to provide advance notice and protections for workers impacted by AI-related job loss. Recent amendments clarify notice requirements, expand worker protections during the notice period, and refine enforcement and penalty provisions. Referred to Assembly Privacy and Consumer Protection Committee Watch Legislative and Regulatory Policies: Labor Relations – Support policies ensuring worker notification and protections. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC SB 992 Niello [R]SB 992 addresses the auditing process for special districts, removing the January 1, 2027, repeal date for certain auditing exceptions. It increases the financial threshold from $150,000 to $250,000, allowing districts with annual revenues below this amount to replace an annual audit with a financial review, agreed-upon procedures, or a financial compilation. Referred to Assembly Local Government Committee Watch Legislative and Regulatory Policies: Governance & Finance – Support policies that streamline audits while maintaining accountability. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC SB 1001 Archuleta [D]SB 1001 requires the Office of Emergency Services to create a standardized identification card (PIV-I credential) program for water utility workers to help them access restricted areas during emergencies. Recent amendments clarify the program’s structure, align it with federal credentialing standards, allow agencies to request cards for qualified personnel, and ensure cardholders can enter closed disaster areas unless safety concerns prevent it. Dead Watch Legislative and Regulatory Policies: Disaster Preparedness – Support programs that improve water utility safety during emergencies. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Favor SB 1036 Grayson [D]SB 1036 modifies the Mitigation Fee Act to require that development impact fees be based on a project’s net impact. Recent amendments require local agencies to reduce or offset fees when a project replaces or demolishes an existing use so that fees reflect only the incremental impact on public facilities. On Assembly Floor Watch Legislative and Regulatory Policies: Development & Land Use – Support policies that ensure fair fee assessment. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC SB 1081 Laird [D]SB 1081 expands an existing exception to mandatory water quality penalties by allowing more small, financially disadvantaged publicly owned treatment works to fund compliance projects instead of paying fines. Recent amendments broaden eligibility to include systems serving 3,000 or fewer people and clarify hardship criteria. Dead Watch Legislative and Regulatory Policies: Water Quality & Compliance Flexibility – Support policies that improve regulatory flexibility and compliance mechanisms for wastewater systems, particularly in ways that enable small systems to invest in infrastructure rather than non‑productive penalties. ACC‑OC - NYC LOCC - NYC CASA - Support CSDA - NYC ACWA - Favor SB 1085 Durazo [D]SB 1085 requires cities and counties to identify applicable public water systems earlier in the housing development process and to request water supply information shortly after an application is submitted. Recent amendments accelerate timelines by requiring water systems to provide water supply assessments within 45 days for certain housing projects, remove the need for public meeting approval, and allow cities or counties to take legal action if assessments are not provided on time. Referred to Assembly Water Parks and Wildlife Committee Watch Legislative and Regulatory Policies: Water Supply & Project Planning – Support policies that improve water system planning and assessments. ACC-OC - NYC LOCC - Track CASA - NYC CSDA - NYC ACWA - Favor OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS SB 1117 Cervantes [D]SB 1117 focuses on accessory dwelling units (ADUs) and junior accessory dwelling units, refining the calculation of impact fees. It mandates that fees for ADUs over 750 square feet be based solely on the area exceeding this threshold, altering local agencies' responsibilities and overriding municipal affairs to ensure statewide applicability. The bill stipulates no state reimbursement for local costs incurred due to these changes. Referred to Assembly Local Government Committee Oppose Unless Amended Legislative and Regulatory Policies: Housing – Support policies that improve equity in ADU fee structures. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - NYC SB 1125 Menjivar [D]SB 1125 mandates the State Water Resources Control Board to devise an annual needs assessment for drinking water by May 1, 2027, and every year afterwards. This includes evaluating the funds required to maintain affordable water services for community systems with fewer than 3,000 connections, updating this analysis every three years. Referred to Assembly Environmental Safety and Toxic Materials Committee Watch Legislative and Regulatory Policies: Water Supply – Support policies ensuring safe, reliable drinking water. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Support SB 1139 Laird [D]SB 1139 gives the Monterey Peninsula Water Management District authority to enforce an existing prohibition against the use of potable water for the irrigation of nonfunctional turf located on commercial, industrial, and institutional properties, and on properties of homeowners’ associations, common interest developments, and community service organizations establishes the Water Rate Assistance Program, administered by the State Water Resources Control Board (State Water Board), to provide rate assistance for drinking water services to low-income residential ratepayers. Referred to Assembly Water Parks and Wildlife Committee Watch Legislative and Regulatory Policies: Water Conservation – Support policies enforcing potable water conservation. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Favor SB 1159 Cabaldon [D]SB 1159 specifies that nonhuman entities, including AI and robots, are excluded from definitions in key legislative acts concerning public access and participation, such as the California Public Records Act and the Political Reform Act. The goal of this legislation is to preserve human- centric interactions in California’s democratic institutions and not overwhelm public agencies by protecting public resources from being consumed by machine-generated requests. Referred to Assembly Privacy and Consumer Protection Committee Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration ACC-OC - NYC LOCC - Support CASA - NYC CSDA - NYC ACWA - NYC SB 1153 Caballero [D]SB 1153 requires urban retail water suppliers in high fire risk areas to update their disaster preparedness plans to include specific wildfire response and mitigation strategies. Recent amendments clarify that these requirements are focused on planning (not guaranteeing water service during fires) and provide liability protections by stating that water systems are not responsible for wildfire damages due to loss of pressure or supply, and are not required to function as firefighting systems. Referred to Assembly Emergency Management Committee Watch Legislative and Regulatory Policies: Disaster Preparedness – Support policies enhancing water supplier wildfire response. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Support/Sponsor SB 1313 McNerney [D]SB 1313 expands funding opportunities for projects that address PFAS contamination in drinking water by allowing grants and loans through existing state and federal funding sources. Recent amendments refine the measure to focus funding specifically on public water systems, clarify eligible activities (like treatment, testing, and planning), and allow implementation through a policy handbook rather than formal rulemaking, streamlining how the program is carried out. Dead Watch Legislative and Regulatory Policies: Water Quality & Contaminants – Support policies addressing PFAS in drinking water. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA - Support SB 1417 Pérez [D]SB 1417 prohibits mutual water companies from charging tenants for water service and requires charges to be directed to shareholders, while establishing notice and public meeting requirements before certain assessments or rate increases. Recent amendments also require disaster-impacted public water systems to complete a disaster impact assessment within six months of an emergency, including evaluating system damage, water supply reliability, affordability impacts, and whether consolidation with another system may be necessary, as a condition of receiving state funding. Referred to Assembly Utilities and Energy Committee Watch Legislative and Regulatory Policies: Disaster Preparedness – Support policies improving post- disaster water system assessment and recovery. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - NYC ACWA -Favor Legend:ACC-OC - Association of California Cities, Orange County LOCC - League of California Cities NYC - Not Yet Considered CASA - California Association of Sanitation Agencies ACWA - Association of California Water Agencies                                                                                                                                       CSDA - California Special Districts Association 1 | P age TO: Orange County Sanitation District FROM: Whittingham Public Affairs Advisors DATE: June 19, 2026 SUBJECT: Local Legislative Report Following are a few of the more notable developments and issues that have transpired in Orange County over the last several weeks: • The Garden Grove manufacturing facility of GKN Aerospace, a global aerospace company that serves more than 90 percent of the world’s aircraft and engine manufacturers, remains a focus of local news coverage. Officials from local, regional, state, and federal agencies continue to review facility records and operating procedures. In addition, U.S. Department of Justice agents visited the site to collect documents and records. The Garden Grove City Council recently held a special meeting where a GKN representative provided an update on the situation. The representative highlighted the company’s $3 million donation to the Orange County United Way, which supported more than 50,000 residents from Stanton, Garden Grove, and neighboring communities who were evacuated over Memorial Day weekend. GKN also reaffirmed its commitment to hosting a town hall meeting once additional information becomes available. The United Way relief fund remained open for approximately two weeks before closing after all available funds were distributed. • The Orange County Board of Supervisors approved a $10.8 billion budget for fiscal year 2026–27. The budget is approximately $300 million lower than the current year’s budget and includes a $75 million shortfall that will be covered with one- time funds. County officials cited inflation and several legal settlements—including a major settlement related to the Airport Fire—as key factors contributing to the budget gap. To date, the County has avoided layoffs by implementing a hiring freeze and eliminating more than 400 vacant positions. 2 | P age • The Board of Supervisors also appointed County Chief Information Officer KC Roestenberg to serve as Interim Chief Executive Officer, succeeding Michelle Aguirre. Ms. Aguirre had announced her plans to retire at the end of her current contract, which concludes June 30, after a 35-year career at the County. • Amid growing public concern over the use of herbicides in local waterways, the Orange County Board of Supervisors voted to permanently stop using herbicides to control vegetation in San Juan and Trabuco Creeks. Fifth District Supervisor Katrina Foley had proposed extending the ban to all waterways maintained by County Public Works. However, a majority of the Board chose to focus first on the two creeks while gathering additional information about potential impacts in other areas. Much of the discussion centered on glyphosate, a common ingredient in many herbicides and pesticides. While glyphosate is widely used for weed control, it has faced ongoing scrutiny over potential health risks, including cancer. Several Orange County cities have already banned glyphosate and similar chemicals, although a watchdog group has raised concerns about enforcement and alleged continued use despite those bans. • The 2026 Orange County Grand Jury took aim at the Board of Supervisors, highlighting how each Supervisor receives $2.5 million annually to both manage staffs of up to a dozen people and provide discretionary funding to organizations and projects in their respective districts. One of the six findings in their new report, entitled “Growing Political Appointees and Discretionary Spending within the OC Board of Supervisors,” detailed a “…widening distance between Supervisors and the Executive Team (which) undermines the value of the County Executive Team and complicates coordination, slows policy implementation, and contributes to fragmented decision-making.” Recommendations include limiting or eliminating the discretionary fund practice, establishing criteria for Supervisorial staff members, and realigning the Board’s engagement with the County Executive Team and department heads on policy matters to enhance collaboration. • The Grand Jury also released a report entitled, “PFAS (per- and polyfluoroalkyl substances) and Public Awareness: A Closer Look at Orange County’s Drinking Water,” which seeks to provide a clear and current understanding of the response by water agencies countywide to PFAS. The Jurors conducted interviews with a number of elected and appointed officials and reviewed published water quality reports and other records from all Orange County water retailers and relevant agencies. The recommendations of the report include enhanced public education and awareness, and the pursuit of cost recovery from PFAS manufacturers “…to offset treatment, monitoring, and long-term remediation costs incurred by local water agencies and ratepayers.” 3 | P age • Orange County’s coastline experienced record swells for several days in early June, which contributed to dangerous conditions at beaches, including the tragic passing of a five-year-old girl in Laguna Beach, who was swept into the ocean along with her mother and brother, the latter two being rescued by onlookers. King tides led to flooding in Newport Beach and other coastal areas. • As results from the June 2 election continue to be updated as signatures are verified and ballots are reviewed, it is expected that two of the three County Board of Supervisors seats on the ballot will move on to a runoff election this November. Second District Supervisor Vicente Sarmiento overwhelmingly defeated three challengers and will retain his seat for another four years, but in the 4th Supervisorial District, Buena Park Mayor Connor Traut and Orange County Department of Education Board member bested two other candidates and will move on to a runoff in November. In the 5th Supervisorial District, incumbent Katrina Foley received several hundred more votes than Assemblymember Diane Dixon, but neither was able to secure more than 50 percent due to a third candidate who received roughly 6 percent of the vote, forcing a runoff for this seat. • Communities across the country are weighing the potential benefits and challenges of data centers, prompting several Southern California cities to adopt moratoriums on new facilities. Concerns raised during these discussions have also extended to battery energy storage system (BESS) projects, with some opponents linking the two and citing potential fire risks. Despite these concerns, the Westminster Reliability Project continues to move forward. The battery energy storage facility, which received unanimous approval from the Westminster City Council in 2025, is currently under construction next to the Southern California Edison Shawnee substation and is expected to begin operations in October. As part of our scope of work, Whittingham Public Affairs Advisors has continued to monitor the various City Council agendas and highlighted issues and items of relevance to OC San. We also continue to monitor activities at the South Coast Air Quality Management District, Orange County Water District, and South Orange County Wastewater Authority. It is a pleasure to work with you and to represent the Orange County Sanitation District. Sincerely, Peter Whittingham 6/30/2026 1 OC San Administration Committee Local Legislative Report Presented By: Peter Whittingham Whittingham Public Affairs Advisors July 8, 2026 Agenda Public Agency Personnel Changes Emerging News & Issues 2026 Regional Issues Forecast Update 2 1 2 6/30/2026 2 Public Agency Personnel Changes In Orange County •Orange County CEO •Placentia City Manager •Irvine City Manager •Anaheim City Manager •Moulton Niguel Water District General Manager •Mesa Water 3 Emerging News & Issues •GKN Aerospace •County Landfills •Herbicides •Budget Challenges Countywide •OC Grand Jury Reports •CalOptima •Budgets & Tax Measures 4 3 4 6/30/2026 3 Updated 2025 Regional Issues Forecast •Elections •South Orange County Wastewater Authority •South Coast Air Quality Management District Rulemaking •OC Local Agency Formation Commission 5 Whittingham Public Affairs Advisors 6 Peter Whittingham CEO peter@whittinghampaa.com 5 6 ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5020 Agenda Date:7/22/2026 Agenda Item No:15. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: WASTEWATER REFUNDING REVENUE OBLIGATIONS, SERIES 2026A GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Authorize the General Manager to issue fixed rate Certificates of Participation,to be referred to as Wastewater Refunding Revenue Obligations,in an amount sufficient to refund up to $50,700,000 of Wastewater Refunding Revenue Obligations, Series 2017A. BACKGROUND A portion of Orange County Sanitation District’s (OC San)debt portfolio will soon be subject to optional redemption.As interest rates are lower than the coupons on the outstanding debt,there is a potential opportunity to refinance the outstanding debt to reduce interest costs for OC San.The Wastewater Refunding Revenue Obligations Series 2017A (2017 Revenue Obligations)are subject to optional redemption on February 1,2027.Under current market conditions,a refunding of $50,700,000 of the outstanding 2017 Revenue Obligations would generate more than 3%net present value savings (the minimum percentage required by OC San’s debt policy). RELEVANT STANDARDS ·Comply with OC San Debt Policy -Financial Management and Procedure 201-3-1;net present value savings are at least three (3)percent of the par amount of the refunded bonds from refunding outstanding bonds PROBLEM The 2017 Revenue Obligations are currently accruing interest at 5.00%rates,which are higher than current market yields.The 2017 Revenue Obligations will soon be available for optional redemption on February 1,2027.Not refunding the 2017 Revenue Obligations on,or before,such date would result in OC San paying above market rates on the 2017 Revenue Obligations. Orange County Sanitation District Printed on 7/13/2026Page 1 of 4 powered by Legistar™ File #:2026-5020 Agenda Date:7/22/2026 Agenda Item No:15. PROPOSED SOLUTION Assuming current market conditions as of June 18,2026,OC San could refund the 2017 Revenue Obligations for present value debt service savings,net of all costs,of approximately $2 million (equal to 4.0%of refunded principal)with a refunding amortization structured with the objective of providing level annual debt service savings. TIMING CONCERNS The Tax Cuts and Jobs Act of 2017 eliminated the ability of issuers to conduct advance refunding (more than 90 days prior to the optional redemption date)on a tax-exempt basis.Therefore, November 4,2026,is the earliest practical closing date for a tax-exempt refinancing of the 2017 Revenue Obligations which is 89 days before the February 1,2027,optional redemption date.A refunding after February 1,2026,would result in OC San continuing to pay interest costs above current market yields. RAMIFICATIONS OF NOT TAKING ACTION Not refunding the 2017 Revenue Obligations would result in OC San continuing to pay above market interest costs. PRIOR COMMITTEE/BOARD ACTIONS September 2025 -Adopted Resolution No.OC SAN 25-16 titled:“A Resolution of the Board of Directors of the Orange County Sanitation District authorizing the execution and delivery by the District of an Installment Purchase Agreement,a Trust Agreement,a Purchase Agreement,a Continuing Disclosure Agreement and an Escrow Agreement in connection with the Orange County Sanitation District Wastewater Refunding Revenue Obligations,Series 2025A,authorizing the execution and delivery of such Revenue Obligations evidencing principal in an aggregate amount of not to exceed $120,000,000,approving a Notice of Intention to Sell,authorizing the distribution of an Official Notice Inviting Bids and an Official Statement in connection with the offering and sale of such Revenue Obligations and authorizing the execution of necessary documents and related actions;and that the Orange County Sanitation District Financing Corporation approve the documents supporting and authorizing the Revenue Obligations in an aggregate amount not to exceed $120,000,000.” ADDITIONAL INFORMATION Outstanding Revenue Obligations OC San currently has seven series of debt issuances outstanding (including the 2017 Revenue Obligations) in the par amount of $523,835,000 as shown in the table below: Orange County Sanitation District Printed on 7/13/2026Page 2 of 4 powered by Legistar™ File #:2026-5020 Agenda Date:7/22/2026 Agenda Item No:15. Outstanding Par Amount (1) Series 2025A Refunding $95,070,000 Series 2024A Refunding $120,685,000 Series 2022A Refunding $81,620,000 Series 2021A Refunding $57,815,000 Series 2017A Refunding(2)$65,815,000 Series 2010C $22,830,000 Series 2010A $80,000,000 Total:$523,835,000 (1)June 30, 2026 (2)2017 Revenue Obligations Depending on market conditions,staff is proposing to refund in November 2026,up to $50,700,000 of the 2017 Revenue Obligations maturing in years 2028 through 2030 with annual coupon rates of 5.00%,as shown in the table below.The principal payment due maturing on February 1,2027,will not be included in the refunding and will be paid per the debt schedule. Series Maturity Principal Amount Coupon 2017A 02/01/2028 $15,830,000 5.00% 2017A 02/01/2029 $16,580,000 5.00% 2017A 02/01/2030 $18,290,000 5.00% Total:$ 50,700,000 Timeline If the Board of Directors approves pursuing the refinancing of the 2017 Revenue Obligations,staff will return to the Administration Committee in September 2026 with financing documents for final approval to complete the refinancing for the 2017 Revenue Obligations.The refinancing of the 2017 Revenue Obligations is expected to close in November 2026.There is the possibility that interest rates may change at the time of approval of the financing documents and,based on then market conditions,staff may recommend a modified refinancing plan.The refunding of the 2017 Revenue Obligations will be sold on a competitive basis to obtain the lowest financing costs possible. The following summarizes the remaining major steps to be completed for the debt refinancings: September 2026: -Board approval of legal and disclosure documents -Financing Corporation approval of legal and disclosure documents -Request and receive ratings from bond rating agencies Orange County Sanitation District Printed on 7/13/2026Page 3 of 4 powered by Legistar™ File #:2026-5020 Agenda Date:7/22/2026 Agenda Item No:15. October 2026: -Marketing and sale through a competitive sale process November 2026: -Closing -Begin debt administration All costs involved with the refinancing,including costs for Norton Rose Fulbright,Special Counsel and Disclosure Counsel and Public Financial Management,Municipal Advisor,will be paid from the proceeds of the new refunding issues. CEQA N/A FINANCIAL CONSIDERATIONS Executing the refunding can potentially save OC San over $700,000 per year in debt interest expenses. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: N/A Orange County Sanitation District Printed on 7/13/2026Page 4 of 4 powered by Legistar™ STEERING COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-5023 Agenda Date:7/22/2026 Agenda Item No:16. FROM:Jon Dumitru, Board Chairman SUBJECT: GENERAL MANAGER’S COMPENSATION AND BENEFITS BOARD CHAIR’S RECOMMENDATION RECOMMENDATION: Adopt Resolution No.OC SAN 26-11 titled:“A Resolution of the Board of Directors of the Orange County Sanitation District approving salary adjustments for the General Manager for Fiscal Year 2026/2027.”The changes consist of a salary increase and corresponding range adjustment of 4.5%, effective in the first pay period of July 2026. BACKGROUND The General Manager of the Orange County Sanitation District (OC San)is employed on an At-Will basis and serves at the pleasure of the Board of Directors. According to Section 6 of the General Manager’s At-Will Employment Agreement,the Steering Committee conducts an annual performance evaluation of the General Manager and reviews his compensation and benefits.Based on this review,the Steering Committee provides a recommendation to the Board regarding any proposed adjustments to be effective in July of the year of the review. The Steering Committee conducted the General Manager’s annual performance evaluation for Fiscal Year 2025/2026 in closed session and recommends that the Board approve the proposed salary increase and corresponding range adjustment of 4.5%.The proposed range adjustment maintains the General Manager at approximately Step 4.4 within the salary range,allowing for salary progression.Additionally,the proposed adjustment is intended to maintain a competitive total compensation package that helps achieve the Board’s targeted market position at the 75th percentile,maintains appropriate salary differentiation and supports the retention of executive leadership. RELEVANT STANDARDS ·Offer competitive compensation and benefits ·Maintain positive employer-employee relations ·Cultivate a highly qualified, well-trained, and diverse workforce ·Comply with OC San policy (Policy 6.1 Appraisal of Performance)and the General Manager’sOrange County Sanitation District Printed on 7/14/2026Page 1 of 4 powered by Legistar™ File #:2026-5023 Agenda Date:7/22/2026 Agenda Item No:16. ·Comply with OC San policy (Policy 6.1 Appraisal of Performance)and the General Manager’s At-Will Employment Agreement PROBLEM Board-approved salary increases for OC San’s Executive Management Team,Manager Group,and represented employees became effective in July 2026.The General Manager’s salary is currently 13.6%above that of the highest-paid direct report.Without a corresponding adjustment,the salary differential will continue to narrow,increasing salary compaction and moving the General Manager’s compensation below the Board’s target market position. PROPOSED SOLUTION Approve Resolution No.OC SAN 26-11 adjusting the General Manager proposed salary increase and corresponding range adjustment for Fiscal Year 2026/2027.The proposed salary adjustment would help maintain an appropriate level of salary differentiation and avoid salary compaction. TIMING CONCERNS The Steering Committee completed the General Manager’s annual performance evaluation in accordance with his agreement.Timely Board approval of the recommended compensation adjustment will align the General Manager’s compensation with previously approved salary adjustments for other employee groups,help maintain appropriate salary differentiation and achieve retention of key staff. RAMIFICATIONS OF NOT TAKING ACTION Delaying action would postpone implementation of any approved adjustment,not maintain the targeted market position at the 75th percentile,and contribute to salary compaction with direct reports. PRIOR COMMITTEE/BOARD ACTIONS June 2026 -Steering Committee reviewed the General Manager’s performance evaluation in closed session. August 2025 -Board of Directors adopted Resolution No.OC SAN 25-14 titled:“A Resolution of the Board of Directors of the Orange County Sanitation District approving salary and benefit adjustments for the General Manager for Fiscal Year 2025/2026.”The changes consist of a salary increase and corresponding salary range adjustment of 4.5%,effective the first pay period of July and changes to a leave bank, 457(b) contribution and mileage reimbursement. ADDITIONAL INFORMATION As a matter of reference,OC San’s accomplishments during the past year,under the direction of the General Manager, include the following: ·Created a CIP staffing plan to minimize Supplemental Engineering Services,improve Orange County Sanitation District Printed on 7/14/2026Page 2 of 4 powered by Legistar™ File #:2026-5023 Agenda Date:7/22/2026 Agenda Item No:16. ·Created a CIP staffing plan to minimize Supplemental Engineering Services,improve succession planning, and streamline project delivery. ·Completed the development,Request for Proposals,and contract award for a customer service portal to improve stakeholder access and service efficiency. ·Developed a new small-project funding process to increase transparency,efficiency,and budget control. ·Identified and prioritized opportunities to apply Artificial Intelligence (AI)to optimize administrative, operational, and treatment processes. ·Conducted a cyber penetration test and red team assessment of process control systems. ·Updated ordinances and policies related to delinquent fees and penalties for discharge permits. ·Received final technical memos outlining asset database improvements and a risk framework for major/critical assets. ·Pursued and completed a cost-saving debt refunding transaction,achieving $14 million in savings. ·Conducted a study to right-size OC San’s transportation fleet and support compliance with clean air standards. ·Developed updated Fats,Oils,and Grease (FOG)outreach materials for food service establishments within OC San’s service area. ·Updated the Industrial Waste Survey program using improved information-management tools to better identify required permittees. ·Transitioned Plant No.1 process and electrical controls from CRISP to the ABB Distributed Control System under project J-120. ·Conducted assessments of easements with encroachments or access constraints,and continued surveys. ·Completed successful vendor demonstration of the Supercritical Water Oxidation unit. ·Initiated Phase 1 permitting for biosolids deep well injection and developed the outreach Scope of Work. ·Developed and conducted a comprehensive high-flow emergency operations exercise simulating influent emergencies and SARI trunkline rupture scenarios. ·Developed a Physical Security Master Plan addressing risk mitigation,regulatory compliance, and long-term facility protection. ·Developed a wastewater laboratory and data science training curriculum to support operator certification. ·Expanded partnerships with vocational training institutions to enhance talent pipelines for hard -to-fill positions in instrumentation, electrical, and engineering. CEQA N/A FINANCIAL CONSIDERATIONS The annual cost of the proposed salary changes is approximately $18,117. The funds for the additional compensation are included in OC San’s operational budget. Orange County Sanitation District Printed on 7/14/2026Page 3 of 4 powered by Legistar™ File #:2026-5023 Agenda Date:7/22/2026 Agenda Item No:16. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Resolution No. OC SAN 26-11 ·General Manager Salary Schedules (Current & Proposed) ·At-Will Employment Agreement, Robert C. Thompson (eff. 7/1/26) Orange County Sanitation District Printed on 7/14/2026Page 4 of 4 powered by Legistar™ OC SAN 26-11-1 RESOLUTION NO. OC SAN 26-11 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE ORANGE COUNTY SANITATION DISTRICT APPROVING SALARY ADJUSTMENTS FOR THE GENERAL MANAGER FOR FISCAL YEAR 2026/2027 WHEREAS, the General Manager provides organizational leadership, strategic direction, and agency oversight for Orange County Sanitation District (OC San); and WHEREAS, the General Manager serves in an at-will employment capacity, which may be terminated at any time by OC San’s Board of Directors with or without cause; and WHEREAS, it is OC San’s philosophy to compensate employee classifications competitively, which currently can be achieved through alignment with the salary market; and WHEREAS, the General Manager’s At-Will Agreement provides for the OC San Steering Committee to conduct an annual performance evaluation of the General Manager and review of his compensation and benefits. The Steering Committee shall make its recommendation(s) to the Board concerning adjustment to the compensation and/or benefits paid or provided to the General Manager. After consideration of the recommendation(s) of the Steering Committee, the Board shall determine and approve the compensation, including benefits, payable to General Manager, which generally becomes effective July of the year of the review; and WHEREAS, the Steering Committee commenced its review of the General Manager’s performance in June 2026, finalized its review and made its recommendation to the Board on July 22, 2026. NOW, THEREFORE, the Board of Directors of the Orange County Sanitation District, DOES HEREBY RESOLVE, DETERMINE, AND ORDER: 1. That the At-Will Agreement with the General Manager (Attached hereto as Exhibit 1) setting forth the terms and conditions of his employment, including changes consisting of a 4.5% salary increase and corresponding salary range adjustment as determined by the Board of Directors, is hereby approved to be effective retroactively to the first pay period of July 2026; 2. That the Board Chair, or his designee, is authorized to implement the changes to salary and benefit items approved herein. OC SAN 26-11-2 PASSED AND ADOPTED at a regular meeting of the Board of Directors held July 22, 2026. ________________________________ Christine Marick Board Vice Chairwoman ATTEST: _______________________________ Kelly A. Lore, MMC Clerk of the Board OC SAN 26-11-3 STATE OF CALIFORNIA ) ) ss COUNTY OF ORANGE ) I, Kelly A. Lore, Clerk of the Board of Directors of the Orange County Sanitation District, do hereby certify that the foregoing Resolution No. OC SAN 26-11 was passed and adopted at a regular meeting of said Board on the 22nd of July 2026, by the following vote, to wit: AYES: NOES: ABSTENTIONS: ABSENT: IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of Orange County Sanitation District this 22nd of July 2026. Kelly A. Lore, MMC Clerk of the Board of Directors Orange County Sanitation District General Manager Salary Schedules Orange County Sanitation District Classification and Compensation Plan Pay Grade Step 1 Step 2 Step 3 Step 4 Step 5 EM37 Annual 340,018$ 357,427$ 375,710$ 394,930$ 415,085$ Monthly 28,335$ 29,786$ 31,309$ 32,911$ 33,101$ Hourly 163.47$ 171.84$ 180.63$ 189.87$ 199.56$ Pay Grade Step 1 Step 2 Step 3 Step 4 Step 5 EM37 Annual 355,326$ 373,506$ 392,621$ 412,693$ 433,763$ Monthly 29,611$ 31,125$ 32,718$ 34,391$ 36,147$ Hourly 170.83$ 179.57$ 188.76$ 198.41$ 208.54$ GENERAL MANAGER, FY 2025-26 (Current) GENERAL MANAGER, FY 2026-27 (Proposed) 1 AT-WILL EMPLOYMENT AGREEMENT Robert C. Thompson General Manager ORANGE COUNTY SANITATION DISTRICT THIS AT-WILL EMPLOYMENT AGREEMENT ("Agreement") is entered into, to be effective the 1st day of July, 2026, by and between: ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to as "OC San"; AND ROBERT C. THOMPSON, sometimes hereinafter referred to as "General Manager" or “Mr. Thompson”; collectively referred to herein as “the Parties” RECITALS WHEREAS, OC San desires to continue to employ Robert C. Thompson, as General Manager of OC San, pursuant to the terms and conditions as set forth in this Agreement; and WHEREAS, Mr. Thompson, by virtue of his education, training and experience, is fully qualified to fill the position of General Manager and desires to serve OC San as its General Manager, pursuant to the terms and conditions of this Agreement; and WHEREAS, per Resolution No. OC SAN 26-__ adopted on July [ ], 2026, OC San’s Board of Directors has approved and authorized the Board Chair to execute this Agreement to include a base-building salary increase of 4.5% of Mr. Thompson’s current salary. 2 WHEREAS, at the beginning of negotiations of a new Agreement, the parties agreed that any salary changes agreed to would take effect retroactively to the first pay period of July 2026, which is the first pay period in the current fiscal year. NOW, THEREFORE, the Parties hereto agree as follows: Section 1: OC San hereby continues to employ Mr. Thompson to serve as General Manager of the Orange County Sanitation District, continuing on the effective date hereof, and continuing until termination by either Party, as provided in this Agreement. In that capacity, Mr. Thompson agrees to perform the functions and duties of General Manager, the administrative head of OC San, as prescribed by the laws of the State of California, and by the rules, regulations, decisions, and directions of the Board of Directors of OC San (hereinafter referred to as "Board"). The General Manager's duties may involve expenditures of time in excess of the regularly established workday or in excess of a forty-hour work week and may also include time outside normal office hours (including attendance at Board and Committee meetings). General Manager is classified as an exempt employee under applicable California and federal wage and hour laws and shall not be entitled to any additional compensation for hours worked in excess of forty in a work week. Section 2: Mr. Thompson shall be employed in an "at-will" capacity serving at the sole pleasure of the Board. This means that either party to this Agreement may terminate the Agreement at any time for any reason with or without cause, and without hearing, upon 30 days' notice to the other party. Mr. Thompson is advised and acknowledges that he has none of the termination rights of a regular employee of OC San. Except as expressly provided herein, and as a condition of employment, Mr. Thompson knowingly, willingly and voluntarily gives up, waives, and disclaims any and all rights he may have, express or implied, to any notice and/or hearing before or after termination, and/or to any continued employment with OC San after termination. As an "at-will" employee, Mr. Thompson understands that he may be subject to termination with or without cause at the sole discretion of the Board, notwithstanding that the other provisions of OC San’s Personnel Policies and Procedures Manual (hereinafter referred to as "Manual") apply to Mr. Thompson. If OC San terminates employment without cause, Mr. Thompson shall be given a thirty (30) day Notice of Termination, and severance pay in an amount equal to six (6) months of his then current annual base salary upon Mr. Thompson’s execution of a valid written release of legal claims and expiration of any legally required revocation period. 3 If OC San terminates this Agreement (thereby terminating Mr. Thompson’s employment) without cause, and Mr. Thompson executes a valid written release of legal claims, the severance pay is considered a cash settlement related to the termination of Mr. Thompson and waiver of legal claims and shall be fully reimbursed to OC San by Mr. Thompson if Mr. Thompson is convicted of a crime involving an abuse of his office or position. Abuse of office or position shall have the meaning set forth in Government Code 53243.4, as may be amended, of either (1) an abuse of public authority, including, but not limited to, waste, fraud, and violation of the law under color of authority, or (2) a crime against public justice, including, but, not limited to, a crime described in Title 5 (commencing with Section 67), Title 6 (commencing with Section 85), and Title 7 (commencing with Section 92) of Part 1 of the Penal Code. . Mr. Thompson shall reimburse such severance pay to OC San no later than six (6) months after such conviction. If Mr. Thompson terminates his employment with 30 days' notice, the Board shall have the right to accept his resignation effective the date notice is given. Such decision to accept his resignation earlier shall not be considered a termination without cause and shall not entitle Mr. Thompson to receive the severance pay noted above. Section 3: The term of this Agreement shall commence on the effective date above and continue for an indefinite duration, until terminated by either Party pursuant to Section 2 above, or unless terminated or amended as provided herein. Section 4: As compensation for the services to be performed hereunder, upon the effective date of this Agreement, OC San agrees to pay General Manager an annual base salary for services rendered of four hundred twenty thousand six hundred eighty dollars ($420,680.00), subject to all applicable deductions and withholdings of any and all sums required by then current state, federal or local law, along with deductions of applicable sums the General Manager is obligated to pay because of participation in plans and programs described in this Agreement, and paid biweekly in accordance with OC San’s established accounting and payroll practices at the same time and in the same manner as other employees of OC San. No increase in salary may exceed the compensation permitted by the applicable salary range for the classification established by duly adopted Resolution of the Board. Section 5: For the period of this Agreement, OC San shall provide Mr. Thompson with a fixed benefit package that includes the following: • Personal Leave – accrued based on years of service for all paid hours, including hours actually worked and hours in a paid-leave payroll status, on a biweekly basis in accordance with the Manual. Personal leave accruals shall not exceed 4 four hundred forty (440) hours as of December 31 of each year. Any hours in excess of said limit, will be paid to Mr. Thompson in January in an amount equal to the hourly rate of compensation. • Administrative Leave – 60 hours per fiscal year, granted and not eligible for annual cash out. • Investment Incentive Salary (llS) – 6% of base salary applied on a biweekly fiscal year basis, and a flat amount of one thousand two hundred fifty dollars ($1,250) annually. • Deferred Compensation – OC San-paid annual allocation of $12,000 allocated on a biweekly calendar year basis. • Car Allowance – OC San-paid annual allocation of $8,400 issued on a semimonthly basis. • Extended Trip Mileage Reimbursement – Mileage reimbursement for business-related trips in excess of seventy five (75) miles one-way driven in Thompson’s personal vehicle. • Medical Allowance – OC San-paid annual allocation of six thousand dollars ($6,000), with any funds not used toward employee portions of insurance premiums to be returned to the employee in a mutually agreeable manner (such as flexible spending account contributions or cash payment). Mr. Thompson’s benefit package also shall include benefits consistent with the Manual for: holiday pay; medical, dental, vision and life insurance at three times base salary; long-term and short-term disability insurance; and employee assistance program. Additionally, Mr. Thompson’s benefit package shall include executive disability insurance benefits, consistent with those provided to OC San managers. These benefits shall remain in full force and effect unless and until replaced by an amendment to this Agreement, signed by Mr. Thompson and approved by the Board, which amendment shall include the effective date thereof. Section 6: OC San’s Steering Committee shall meet with General Manager in connection with the conclusion of each fiscal year of service during the term of this Agreement to review and evaluate his performance over the prior year. The Steering Committee shall make its recommendation(s) to the Board concerning adjustment to the compensation and/or benefits paid or provided to General Manager, to be effective in July of the year of review. After consideration of the recommendation(s) of the Steering Committee, the Board shall determine and approve the compensation, including benefits, payable to General Manager, which generally becomes effective July of the fiscal year of the review. Failure of OC San to review and evaluate the performance of 5 the General Manager pursuant to this section shall not affect the right of OC San to terminate the General Manager's employment and shall not be considered a breach of this Agreement. Section 7: Mr. Thompson shall be a Participant Member in the Orange County Employees Retirement System ("OCERS"). OC San shall pay the required employer's contribution of Mr. Thompson’s required employee contribution rate for membership in OCERS pension Plan H which includes full payment of Employer Paid Member Contribution (“EPMC”). Section 8: OC San shall reimburse General Manager for all expenses paid by him and incurred for non-personal, job-related OC San business that are reasonably necessary to the General Manager's service to OC San and are not specifically provided for herein. OC San agrees to either pay such expenses in advance or to reimburse the expenses, so long as the expenses are incurred and submitted according to the criteria established by OC San’s budget and/or normal expense reimbursement procedures pursuant to applicable policy Resolutions. To be eligible for reimbursement, all expenses must be supported by documentation meeting OC San’s policies and requirements and must be submitted within time limits established by OC San. Such reimbursement shall not be considered a benefit. Section 9: During the period of this Agreement, it is agreed that General Manager shall devote his full time, skills, labor, and attention to said employment. At no time may General Manager undertake outside activities consisting of consultant work, speaking engagements, writing, lecturing, or other similar professional activities for money or other consideration without prior approval of OC San’s Steering Committee. However, the expenditure of reasonable amount of time for educational, charitable, or professional activities shall not be deemed a breach of this Agreement if those activities do not conflict or materially interfere with the services required under this Agreement and shall not require the prior written consent of the Steering Committee. This Agreement shall not be interpreted to prohibit General Manager from making passive personal investments or conducting private business affairs, provided those activities are not deemed to be a conflict of interest by state law nor do they conflict or materially interfere with the services required under this Agreement. Nothing in this At-Will Employment Agreement shall be construed to prevent General Manager from engaging in lawful conduct outside of working hours that does not materially interfere with General Manager’s employment. Section 10: The Board has the sole discretion to determine whether OC San shall pay General Manager pending an investigation into any alleged misconduct by General Manager. In the event that OC San’s Board determines, in its sole discretion, that it is in the best interest of OC San for General Manager to be placed on paid administrative leave pending such an investigation, 6 General Manager shall fully reimburse any salary provided for that purpose if the misconduct for which the General Manager was under investigation results in the General Manager being convicted of a crime involving an abuse of his office or position as defined in Section 2 of this Agreement. General Manager shall reimburse such salary to OC San no later than six months after such conviction. Section 11: In the event that OC San provides funds for the legal criminal defense of General Manager, General Manager shall fully reimburse said funds to OC San if the General Manager is convicted of a crime involving an abuse of his/her office or position as defined in Section 2 of this Agreement. General Manager shall reimburse such criminal legal defense fees to OC San no later than six months after such conviction. Section 12: Other employment benefits for General Manager not specifically provided for in this At-Will Employment Agreement are set out in the Manual. Section 13: This Agreement supersedes any and all other prior agreements, either oral or in writing, between the Parties hereto with respect to the employment of Mr. Thompson by OC San and contains all of the covenants and agreements between the Parties with respect to that employment in any manner whatsoever. Each Party to this Agreement acknowledges that no representation, inducement, promise, or agreement, orally or otherwise, has been made by any Party, or anyone acting on behalf of any Party, which is not embodied herein, and that no other agreement, statement, or promise not contained in this Agreement or Employment shall be valid or binding on either Party. Section 14: Any notices to be given hereunder by either Party to the other shall be in writing and may be transmitted by personal delivery, or by mail, registered or certified, postage prepaid, with return receipt requested. Mailed notices shall be addressed to the Parties at the addresses maintained in the personnel records of OC San, but each Party may change that address by written notice in accordance with this Section. Notices delivered personally shall be deemed communicated as of the date of actual receipt; mailed notices shall be deemed communicated as of the date of mailing. Section 15: Any modifications of this Agreement will be effective only if set forth in writing and signed by the Parties. 7 Section 16: The failure of either Party to insist on strict compliance with any of the terms, covenants, or conditions of this Agreement by the other Party, shall not be deemed a waiver of that term, covenant, or condition, nor shall any waiver or relinquishment of any right or power at any one time or times be deemed a waiver or relinquishment of that right or power for all or any other times. Section 17: If any term or other provision of this At-Will Employment Agreement is determined by a court of competent jurisdiction to be invalid, illegal, or incapable of being enforced by any rule of law or public policy, all other terms, provisions, and conditions shall nevertheless remain in full force and effect. Upon such determination that any term or other provision is invalid, illegal, or incapable of being enforced, the Parties hereto shall negotiate in good faith to modify this Agreement so as to affect the original intent of the Parties as closely as possible to the fullest extent permitted by applicable law in an acceptable manner to the end that the transactions contemplated hereby are fulfilled to the extent possible. Section 18: This Agreement shall be governed by and construed in accordance with the laws of the State of California and all applicable ordinances, policies, and resolutions. Section 19: General Manager acknowledges that he has had the opportunity and has conducted an independent review of the financial and legal effects of this Agreement. General Manager acknowledges that he has made an independent judgment upon the financial and legal effects of the Agreement and has not relied upon representation of OC San, its elected or appointed officers and officials, agents, or employees other than those expressly set forth in this Agreement. General Manager acknowledges that he has been advised to obtain, and has availed himself of, legal advice with respect to the terms and provisions of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this At-Will Employment Agreement as follows. GENERAL MANAGER By:___________________________ Robert C. Thompson 8 VICE CHAIR, BOARD OF DIRECTORS By:_____________________________ Christine Marick APPROVED AS TO FORM: ___________________________________ Scott C. Smith General Counsel Date:_______________________________ ORANGE COUNTY SANITATION DISTRICT COMMON ACRONYMS ACWA Association of California Water Agencies LOS Level Of Service RFP Request For Proposal APWA American Public Works Association MGD Million Gallons Per Day RWQCB Regional Water Quality Control Board AQMD Air Quality Management District MOU Memorandum of Understanding SARFPA Santa Ana River Flood Protection Agency ASCE American Society of Civil Engineers NACWA National Association of Clean Water Agencies SARI Santa Ana River Interceptor BOD Biochemical Oxygen Demand NEPA National Environmental Policy Act SARWQCB Santa Ana Regional Water Quality Control Board CARB California Air Resources Board NGOs Non-Governmental Organizations SAWPA Santa Ana Watershed Project Authority CASA California Association of Sanitation Agencies NPDES National Pollutant Discharge Elimination System SCADA Supervisory Control And Data Acquisition CCTV Closed Circuit Television NWRI National Water Research Institute SCAP Southern California Alliance of Publicly Owned CEQA California Environmental Quality Act O & M Operations & Maintenance SCAQMD South Coast Air Quality Management District CIP Capital Improvement Program OCCOG Orange County Council of Governments SOCWA South Orange County Wastewater Authority CRWQCB California Regional Water Quality Control Board OCHCA Orange County Health Care Agency SRF Clean Water State Revolving Fund CWA Clean Water Act OCSD Orange County Sanitation District SSMP Sewer System Management Plan CWEA California Water Environment Association OCWD Orange County Water District SSO Sanitary Sewer Overflow EIR Environmental Impact Report OOBS Ocean Outfall Booster Station SWRCB State Water Resources Control Board EMT Executive Management Team OSHA Occupational Safety and Health Administration TDS Total Dissolved Solids EPA US Environmental Protection Agency PCSA Professional Consultant/Construction TMDL Total Maximum Daily Load FOG Fats, Oils, and Grease PDSA Professional Design Services Agreement TSS Total Suspended Solids gpd gallons per day PFAS Per- and Polyfluoroalkyl Substances WDR Waste Discharge Requirements GWRS Groundwater Replenishment System PFOA Perfluorooctanoic Acid WEF Water Environment Federation ICS Incident Command System PFOS Perfluorooctanesulfonic Acid WERF Water Environment & Reuse Foundation IERP Integrated Emergency Response Plan POTW Publicly Owned Treatment Works WIFIA Water Infrastructure Finance and Innovation Act JPA Joint Powers Authority ppm parts per million WIIN Water Infrastructure Improvements for the LAFCO Local Agency Formation Commission PSA Professional Services Agreement WRDA Water Resources Development Act ORANGE COUNTY SANITATION DISTRICT GLOSSARY OF TERMS ACTIVATED SLUDGE PROCESS – A secondary biological wastewater treatment process where bacteria reproduce at a high rate with the introduction of excess air or oxygen and consume dissolved nutrients in the wastewater. BENTHOS – The community of organisms, such as sea stars, worms, and shrimp, which live on, in, or near the seabed, also known as the benthic zone. BIOCHEMICAL OXYGEN DEMAND (BOD) – The amount of oxygen used when organic matter undergoes decomposition by microorganisms. Testing for BOD is done to assess the amount of organic matter in water. BIOGAS – A gas that is produced by the action of anaerobic bacteria on organic waste matter in a digester tank that can be used as a fuel. BIOSOLIDS – Biosolids are nutrient rich organic and highly treated solid materials produced by the wastewater treatment process. This high-quality product can be recycled as a soil amendment on farmland or further processed as an earth-like product for commercial and home gardens to improve and maintain fertile soil and stimulate plant growth. CAPITAL IMPROVEMENT PROGRAM (CIP) – Projects for repair, rehabilitation, and replacement of assets. Also includes treatment improvements, additional capacity, and projects for the support facilities. COLIFORM BACTERIA – A group of bacteria found in the intestines of humans and other animals, but also occasionally found elsewhere, used as indicators of sewage pollution. E. coli are the most common bacteria in wastewater. COLLECTIONS SYSTEM – In wastewater, it is the system of typically underground pipes that receive and convey sanitary wastewater or storm water. CERTIFICATE OF PARTICIPATION (COP) – A type of financing where an investor purchases a share of the lease revenues of a program rather than the bond being secured by those revenues. CONTAMINANTS OF POTENTIAL CONCERN (CPC) – Pharmaceuticals, hormones, and other organic wastewater contaminants. DILUTION TO THRESHOLD (D/T) – The dilution at which the majority of people detect the odor becomes the D/T for that air sample. GREENHOUSE GASES (GHG) – In the order of relative abundance water vapor, carbon dioxide, methane, nitrous oxide, and ozone gases that are considered the cause of global warming (“greenhouse effect”). GROUNDWATER REPLENISHMENT SYSTEM (GWRS) – A joint water reclamation project that proactively responds to Southern California’s current and future water needs. This joint project between the Orange County Water District and OCSD provides 70 million gallons per day of drinking quality water to replenish the local groundwater supply. LEVEL OF SERVICE (LOS) – Goals to support environmental and public expectations for performance. N-NITROSODIMETHYLAMINE (NDMA) – A N-nitrosamine suspected cancer-causing agent. It has been found in the GWRS process and is eliminated using hydrogen peroxide with extra ultra-violet treatment. NATIONAL BIOSOLIDS PARTNERSHIP (NBP) – An alliance of the NACWA and WEF, with advisory support from the EPA. NBP is committed to developing and advancing environmentally sound and sustainable biosolids management practices that go beyond regulatory compliance and promote public participation to enhance the credibility of local agency biosolids programs and improved communications that lead to public acceptance. PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) – A large group (over 6,000) of human-made compounds that are resistant to heat, water, and oil and used for a variety of applications including firefighting foam, stain and water-resistant clothing, cosmetics, and food packaging. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA) have been the focus of increasing regulatory scrutiny in drinking water and may result in adverse health effects including developmental effects to fetuses during pregnancy, cancer, liver damage, immunosuppression, thyroid effects, and other effects. PERFLUOROOCTANOIC ACID (PFOA) – An ingredient for several industrial applications including carpeting, upholstery, apparel, floor wax, textiles, sealants, food packaging, and cookware (Teflon). PERFLUOROOCTANESULFONIC ACID (PFOS) – A key ingredient in Scotchgard, a fabric protector made by 3M, and used in numerous stain repellents. PLUME – A visible or measurable concentration of discharge from a stationary source or fixed facility. PUBLICLY OWNED TREATMENT WORKS (POTW) – A municipal wastewater treatment plant. SANTA ANA RIVER INTERCEPTOR (SARI) LINE – A regional brine line designed to convey 30 million gallons per day of non-reclaimable wastewater from the upper Santa Ana River basin to the ocean for disposal, after treatment. SANITARY SEWER – Separate sewer systems specifically for the carrying of domestic and industrial wastewater. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) – Regional regulatory agency that develops plans and regulations designed to achieve public health standards by reducing emissions from business and industry. SECONDARY TREATMENT – Biological wastewater treatment, particularly the activated sludge process, where bacteria and other microorganisms consume dissolved nutrients in wastewater. SLUDGE – Untreated solid material created by the treatment of wastewater. TOTAL SUSPENDED SOLIDS (TSS) – The amount of solids floating and in suspension in wastewater. ORANGE COUNTY SANITATION DISTRICT GLOSSARY OF TERMS TRICKLING FILTER – A biological secondary treatment process in which bacteria and other microorganisms, growing as slime on the surface of rocks or plastic media, consume nutrients in wastewater as it trickles over them. URBAN RUNOFF – Water from city streets and domestic properties that carry pollutants into the storm drains, rivers, lakes, and oceans. WASTEWATER – Any water that enters the sanitary sewer. WATERSHED – A land area from which water drains to a particular water body. OCSD’s service area is in the Santa Ana River Watershed.