HomeMy WebLinkAbout07-22-2026 Board Meeting Complete Agenda PacketNOTICE OF REGULAR MEETING AGENDA
PUBLIC PARTICIPATION NOTICE
ORANGE COUNTY SANITATION DISTRICT
BOARD OF DIRECTORS
JULY 22, 2026 - 6:00 PM
ACCESSIBILITY FOR THE GENERAL PUBLIC
Your participation is always welcome. OC San offers several ways in which to interact during
this meeting.
MEETING PARTICIPATION INSTRUCTIONS
www.ocsan.gov
IN-PERSON MEETING ATTENDANCE
OC San Headquarters: 18480 Bandilier Circle, Fountain Valley, CA 92708
ONLINE MEETING PARTICIPATION
Join the meeting now
PARTICIPATE BY TELEPHONE
Dial: (213) 279-1455
Phone Conference ID: 881 395 579#
WATCH THE MEETING ONLINE
https://ocsd.legistar.com/Calendar.aspx
Details on how to participate can be found on our website at
Join the live meeting on Teams:
The meeting will be available for online viewing at:
For any questions and/or concerns, please contact the Clerk of the Board’s office at
714-593-7433. Thank you for your interest in OC San!
SUBMIT A COMMENT
Online at: https://ocsd.legistar.com/Calendar.aspx or by emailing: OCSanClerk@ocsan.gov
BOARD OF DIRECTORS
Regular Meeting Agenda
Wednesday, July 22, 2026 - 6:00 PM
Headquarters - Board Room
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
ACCOMMODATIONS FOR THE DISABLED: If you require any special disability related accommodations, please
contact the Orange County Sanitation District (OC San) Clerk of the Board’s office at (714) 593-7433 at least 72
hours prior to the scheduled meeting. Requests must specify the nature of the disability and the type of
accommodation requested.
AGENDA DESCRIPTION: The agenda provides a brief general description of each item of business to be
considered or discussed. The recommended action does not indicate what action will be taken. The Board of
Directors may take any action which is deemed appropriate.
MEETING RECORDING: A recording of this meeting is available within 24 hours after adjournment of the
meeting at https://ocsd.legistar.com/Calendar.aspx or by contacting the Clerk of the Board.
SUBMIT A COMMENT: You may submit your comments and questions in writing in advance of, or during the
meeting by using the eComment feature available online at: https://ocsd.legistar.com/Calendar.aspx or by
sending them to OCSanClerk@ocsan.gov with the subject line "PUBLIC COMMENT ITEM # [insert relevant item
number]" or "PUBLIC COMMENT NON-AGENDA ITEM". All written public comments will be provided to the
legislative body and may be read into the record or compiled as part of the record.
NOTICE TO DIRECTORS: To place items on the agenda for a Committee or Board Meeting, the item must be
submitted to the Clerk of the Board: Kelly A. Lore, MMC, (714) 593-7433 / klore@ocsan.gov at least 14 days
before the meeting. For any questions on the agenda, Board members may contact staff at:
General Manager: Rob Thompson, rthompson@ocsan.gov / (714) 593 7110
Asst. General Manager: Lorenzo Tyner, ltyner@ocsan.gov / (714) 593 7550
Director of Communications: Jennifer Cabral, jcabral@ocsan.gov / (714) 593 7581
Director of Engineering: Mike Dorman, mdorman@ocsan.gov / (714) 593 7014
Director of Environmental Services: Lan Wiborg, lwiborg@ocsan.gov / (714) 593 7450
Director of Finance: Wally Ritchie, writchie@ocsan.gov / (714) 593 7570
Director of Human Resources: Laura Maravilla, lmaravilla@ocsan.gov / (714) 593 7007
Director of Operations & Maintenance: Riaz Moinuddin, rmoinuddin@ocsan.gov / (714) 593 7269
View Current Board of Directors
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026
CALL TO ORDER
Board Vice Chairwoman Christine Marick
INVOCATION AND PLEDGE OF ALLEGIANCE
Director Carlos A. Leon, City of Anaheim
ROLL CALL AND DECLARATION OF QUORUM
Clerk of the Board
PUBLIC COMMENTS:
Your participation is always welcome. Specific information as to how to participate in a meeting is detailed in the
Special Notice attached to this agenda. In general, OC San offers several ways in which to interact during
meetings: you may participate in person, join the meeting live via Teams on your computer or similar device or
web browser, join the meeting live via telephone, view the meeting online, and/or submit comments for
consideration before or during the meeting.
SPECIAL PRESENTATIONS:
1.2026-5022EMPLOYEE SERVICE AWARDS
25-year Service Awards
Dindo Carrillo, Regulatory Specialist - Division 650
Originator:Kelly Lore
REPORTS:
The Board Chairperson and the General Manager may present verbal reports on miscellaneous matters of
general interest to the Directors. These reports are for information only and require no action by the Directors.
CONSENT CALENDAR:
Consent Calendar Items are considered to be routine and will be enacted, by the Board of Directors, after one
motion, without discussion. Any items withdrawn from the Consent Calendar for separate discussion will be
considered in the regular order of business.
2.2026-4710APPROVAL OF MINUTES
RECOMMENDATION:
Approve minutes of the Regular meeting of the Board of Directors held June 24, 2026.
Originator:Kelly Lore
Page 2 of 9
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026
Agenda Report
06-24-2026 Board Meeting Minutes
Attachments:
RECEIVE AND FILE:
3.2026-4686COMMITTEE MEETING MINUTES
RECOMMENDATION: Receive and file the following:
A. Minutes of the GWRS Committee Meeting held January 12, 2026
B. Minutes of the Steering Committee Meeting held May 27, 2026
C. Minutes of the Operations Committee Meeting held June 3, 2026
D. Minutes of the Administration Committee Meeting held June 10, 2026
Originator:Kelly Lore
Attachments:
4.2026-4762REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH
OF JUNE 2026
RECOMMENDATION: Receive and file the following:
Report of the Investment Transactions for the month of June 2026.
Originator:Wally Ritchie
Attachments:
OPERATIONS COMMITTEE:
5.2026-5009COMBINATION SEWER CLEANING TRUCK REFURBISHMENT
RECOMMENDATION:
A. Approve a Sole Source Purchase Order to Haaker Equipment Company to
refurbish one Combination Sewer Cleaning Truck for a total amount not to
exceed $402,186, not including applicable sales tax and freight; and
B. Approve a contingency of $60,328 (15%).
Originator:Riaz Moinuddin
Page 3 of 9
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026
Agenda ReportAttachments:
6.2026-5010GAS COMPRESSOR INTERCOOLERS CRITICAL SPARES
RECOMMENDATION:
A. Approve a Sole Source Purchase Order to NEAC Compressor Service USA,
Inc., for the procurement of two spare intercoolers for digester gas compressors
in an amount not to exceed $246,754, not including applicable sales tax and
freight; and
B. Approve a contingency of $24,675 (10%).
Originator:Riaz Moinuddin
Attachments:
7.2026-5011ON-CALL CONDITION ASSESSMENT PROGRAM SUPPORT
SERVICES, SPECIFICATION NO. S-2026-720BD
RECOMMENDATION:
A. Approve a Services Contract with Jamison Engineering Contractors, Inc. to
provide on-call condition assessment program support services, Specification
No. S-2026-720BD, for the period of August 1, 2026, through June 30, 2027, for
a total amount not to exceed $1,114,638 with four (4) one-year renewal options;
B. Approve an annual increase not to exceed 3.5% of the previous year’s amount;
and
C. Approve an annual contingency not to exceed 10% of the annual contract
amount for all renewal periods.
Originator:Mike Dorman
Attachments:
8.2026-5012REDHILL RELIEF SEWER RELOCATION AT STATE ROUTE 55,
PROJECT NO. FE18-13
RECOMMENDATION:
Approve the Second Amendment to Utility Agreement No. OCSD-1005, between the
Orange County Sanitation District and the Orange County Transportation Authority, for
final reimbursement amount of $4,996,443 for Project No. FE18-13, Redhill Relief
Sewer Relocation at State Route 55, in the City of Santa Ana.
Originator:Mike Dorman
Page 4 of 9
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026
Agenda Report
Second Amendment OCSD-1005
First Amendment OCSD-1005
Utility Agreement OCSD-1005
Attachments:
9.2026-5013SUPPLEMENTAL ENGINEERING SERVICES, CONTRACT NO.
PSA2026-001
RECOMMENDATION:
A. Approve Professional Services Agreements to provide Supplemental
Engineering Services, Contract No. PSA2026-001, for a three-year period with
two one-year renewal options effective October 1, 2026, for a combined total
amount not to exceed $55,800,000, initially allocated as follows:
·AECOM Technical Services, Inc. - $27,900,000
·Jacobs Project Management Co. - $27,900,000; and
B. Authorize the General Manager to transfer funds between the two Professional
Services Agreements, as needed, to align contract budgets with actual workload
distribution, with no increase to the total Board-authorized amount.
Originator:Mike Dorman
Attachments:
ADMINISTRATION COMMITTEE:
10.2026-5015RENEW NUTANIX SOFTWARE SUBSCRIPTION, SPECIFICATION NO.
S-2026-731BD
RECOMMENDATION:
A. Approve a Purchase Order Contract to Saitech Inc. for the Purchase of Nutanix
Software, Specification No. S-2026-731BD, for a total amount not to exceed
$428,173; and
B. Approve a contingency of $42,817 (10%).
Originator:Wally Ritchie
Attachments:
Page 5 of 9
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026
11.2026-50162027 BENEFITS INSURANCE RENEWAL
RECOMMENDATION:
A. Approve the Orange County Sanitation District 2027 Benefits Insurance Renewal
with the carriers listed below for an overall not-to-exceed amount of $21,321,535
as specified below:
1.Benefit Coordinators Company (BCC) (medical, dental, vision plans, and
Employee Assistance Program [EAP]) - Not to Exceed $18,721,669;
2.Lincoln Financial (basic life, short- and long-term disability) - Not to Exceed
$551,619;
3.Lincoln Financial (EMT & Manager disability) - Not to Exceed $36,000;
4.HealthEquity (Health Savings Accounts [HSA]) - Not to Exceed $55,386;
5.Voya (Health Reimbursement Arrangement [HRA]) - Not to Exceed $217,980;
6.WEX (Flexible Spending Accounts [FSA]) - Not to Exceed $11,606;
7.BCC (retiree-paid health premiums, recouped from retirees through monthly
payments) - Not to Exceed $711,964;
8.Approve a contingency of $1,015,311 (5%); and
B. Authorize the General Manager to revise the carriers within the not-to-exceed
amounts listed above for operational efficiency and/or to better meet the needs
of the Orange County Sanitation District and participants.
Originator:Laura Maravilla
Attachments:
12.2026-5017
RECOMMENDATION:
A. Approve a Purchase Order Contract to Nth Generation Computing, Inc. for the
purchase of the VMware Software Enterprise License Agreement (ELA)
Subscription, Specification No. S-2026-732BD, for a five (5)-year term, with a
total amount not to exceed $3,565,600 plus applicable sales tax; and
B. Approve a contingency in the amount of $356,560 (10%).
Originator:Wally Ritchie
Attachments:
Page 6 of 9
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026
13.2026-5018PUBLIC AFFAIRS STRATEGIC PLAN FOR FISCAL YEARS 2024-2026
SUMMARY
RECOMMENDATION:
Receive and file the Public Affairs Strategic Plan for Fiscal Years 2024-2026 Summary.
Originator:Jennifer Cabral
Attachments:
14.2026-5019LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF JUNE 2026
RECOMMENDATION:
Receive and file the Legislative Affairs Update for the month of June 2026.
Originator:Jennifer Cabral
Attachments:
15.2026-5020WASTEWATER REFUNDING REVENUE OBLIGATIONS, SERIES
2026A
RECOMMENDATION:
Authorize the General Manager to issue fixed rate Certificates of Participation, to be
referred to as Wastewater Refunding Revenue Obligations, in an amount sufficient to
refund up to $50,700,000 of Wastewater Refunding Revenue Obligations, Series
2017A.
Originator:Wally Ritchie
Attachments:
STEERING COMMITTEE:
None.
Page 7 of 9
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026
NON-CONSENT:
16.2026-5023GENERAL MANAGER’S COMPENSATION AND BENEFITS
RECOMMENDATION:
Adopt Resolution No. OC SAN 26-11 titled: “A Resolution of the Board of Directors of
the Orange County Sanitation District approving salary adjustments for the General
Manager for Fiscal Year 2026/2027.” The changes consist of a salary increase and
corresponding range adjustment of 4.5%, effective in the first pay period of July 2026.
Originator:Laura Maravilla
Attachments:
INFORMATION ITEMS:
None.
AB 1234 DISCLOSURE REPORTS:
This item allows Board members to provide a brief oral report regarding the disclosure of outside committees,
conferences, training, seminars, etc. attended at the Agency’s expense, per Government Code §53232.3(d).
• Report from Board Delegate - ISDOC
• Report from Board Delegate - NWRI
• Report from Board Delegate - OCCOG
• Report from Board Delegate - SARFPA
• Report from GWRS Steering Committee Member(s)
• Other
CLOSED SESSION:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
At this time Directors may request staff to place an item on a future agenda.
Page 8 of 9
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, July 22, 2026
ADJOURNMENT
Adjourn the Board meeting until the Regular Meeting of the Board of Directors on August 26,
2026 at 6:00 p.m.
AFFIDAVIT OF POSTING:
I hereby certify under penalty of perjury and as required by the State of California, Government Code §
54954.2(a), that the foregoing Agenda was posted online at www.ocsan.gov, in the lobby, and outside the main
door of Orange County Sanitation District Headquarters at 18480 Bandilier Cir. Fountain Valley, CA 92708 not
less than 72 hours prior to the meeting date and time above. All public records relating to each agenda item,
including those distributed less than 72 hours prior to the meeting to a majority of the Board of Directors, are
available for public inspection with the Clerk of the Board.
/s/ Kelly A. Lore, MMC
Clerk of the Board
July 15, 2026
Page 9 of 9
BOARD OF DIRECTORS
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-4710 Agenda Date:7/22/2026 Agenda Item No:2.
FROM:Robert Thompson, General Manager
Originator: Kelly A. Lore, Clerk of the Board
SUBJECT:
APPROVAL OF MINUTES
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Approve minutes of the Regular meeting of the Board of Directors held June 24, 2026.
BACKGROUND
In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting
will be provided to the Directors for subsequent approval at the following meeting.
RELEVANT STANDARDS
·Resolution No. OC SAN 26-02
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·June 24, 2026 Board of Directors meeting minutes
Orange County Sanitation District Printed on 7/14/2026Page 1 of 1
powered by Legistar™
ORANGE COUNTY SANITATION DISTRICT
MINUTES
BOARD OF DIRECTORS
JUNE 24, 2026
Headquarters - Board Room
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
BOARD OF DIRECTORS Minutes June 24, 2026
CALL TO ORDER:
A regular meeting of the Board of Directors of the Orange County Sanitation District was
called to order by Board Vice Chairman Jon Dumitru on Wednesday, June 24, 2026 at 6:03
p.m. in the Orange County Sanitation District Headquarters. Director John Withers delivered
the invocation and led the Pledge of Allegiance.
ROLL CALL AND DECLARATION OF QUORUM:
The Clerk of the Board declared a quorum present as follows:
PRESENT:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General
Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of
Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of
Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of
Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; Belen Carrillo; Jackie
Castro; Sam Choi; Daisy Covarrubias; Don Cutler; Thys DeVries; Martin Dix; Justin Fenton; Al
Garcia; David Haug; Mark Kawamoto; Joe Manzella; Tom Meregillano; Rob Michaels;
Nicholas Oswald; Aldwin Ramirez; Thomas Vu; and Kevin Work were present in the Board
Room.
OTHERS PRESENT: Scott Smith General Counsel; and Michael Valdez, Special Counsel,
Woodruff & Smart were present in the Board Room.
PUBLIC COMMENTS:
Public Comment was received from Ted Beresford, 16521 Rhone Lane, Huntington Beach,
who spoke in opposition of the construction activities on Rhone Lane.
SPECIAL PRESENTATIONS:
1.EMPLOYEE SERVICE AWARDS 2026-4971
Originator: Kelly Lore
Page 1 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
Administration Committee Chair Christine Marick recognized Senior Environmental
Specialist Rob Gamber, who was not in attendance, for his 20 years of service.
20-year Service Awards
Rob Gamber, Senior Environmental Specialist - Division 630
Joe Manzella, Environmental Supervisor - Division 630
Nick Oswald, Maintenance Manager - Division 820
REPORTS:
Vice Chair Dumitru announced that OC San’s Administrative Offices would be closed on
Friday, July 3rd in observance of Independence Day.
Vice Chair Dumitru reported the following Committee Appointments which become effective
July 1, 2026:
·Jamie Valencia - Administration Committee Chairperson and Steering Committee Member
·Jose Medrano - Administration Committee Vice-Chairperson
·Board Vice Chairwoman Christine Marick - Audit Ad Hoc Committee Member
·Ryan Gallagher - Operations Committee, GWRS Committee and Steering Committee
member.
Vice Chair Dumitru also announced that John Withers would step down from the Steering
Committee and thanked him for his service of over 16 years.
Lastly, Vice Chair Dumitru announced that the Directors and Alternate Directors would receive
talking points highlighting OC San activities to assist in reporting to their agencies on OC San
outreach efforts.
General Manager Thompson reported on the recent OC San All hands meetings where fiscal
year-end and upcoming fiscal year updates were provided. Mr. Thompson thanked new
incoming Board Chairman Jon Dumitru for attending and expressing his appreciation to staff
on behalf of the Board.
Mr. Thompson reported on his recent speaking engagements with: CASA Partnering for
Impact; SCCWRP Commission Meeting; NWRI Board Meeting; MWDOC Water Policy
Forum; Fullerton State of the City; and tours with the cities of: Yorba Linda Water District,
Irvine and Tustin. Mr. Thompson also announced that OC San had received the American
INHOUSE Design Awards for the OC San Annual Report and the Santa Ana Truck Sewer
Rehab project movie poster promo.
Mr. Thompson provided a brief report on the General Manager’s Fiscal Year 2025-2026 Work
Plan Year-End Report; and the new General Manager’s FY 2026-2027 Work Plan.
CONSENT CALENDAR:
2.APPROVAL OF MINUTES 2026-4709
Originator: Kelly Lore
Page 2 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
MOVED, SECONDED, AND DULY CARRIED TO:
Approve minutes of the Regular meeting of the Board of Directors held May 27, 2026.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
RECEIVE AND FILE:
3.COMMITTEE MEETING MINUTES 2026-4685
Originator: Kelly Lore
WITHOUT OBJECTION ACTION TAKEN TO RECEIVE AND FILE THE FOLLOWING:
A. Minutes of the Steering Committee Meeting held April 22, 2026
B. Minutes of the Operations Committee Meeting held May 6, 2026
C. Minutes of the Administration Committee Meeting held May 13, 2026
4.REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH
OF MAY 2026
2026-4760
Originator: Wally Ritchie
WITHOUT OBJECTION ACTION TAKEN TO RECEIVE AND FILE THE FOLLOWING:
Report of the Investment Transactions for the month of May 2026.
OPERATIONS COMMITTEE:
5.HEADWORKS STANDBY GENERATOR NO. 1 AND EPSA STANDBY
GENERATOR NO. 3 RADIATOR REPLACEMENTS AT PLANT NO. 2
(MP2-029), SPECIFICATION NO. S-2026-722BD
2026-4963
Originator: Riaz Moinuddin
MOVED, SECONDED, AND DULY CARRIED TO:
Page 3 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
A. Approve a General Services Contract to Minako America Corporation DBA
Minco Construction, for Headworks Standby Generator No. 1 and EPSA
Standby Generator No. 3 Radiator Replacements at Plant No. 2 (MP2-029),
Specification No. S-2026-722BD, for a total amount not to exceed $474,000;
and
B. Approve a contingency of $47,400 (10%).
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
6.CENGEN INSTRUMENT AIR COMPRESSORS REPLACEMENT AT
PLANT NO. 1, PROJECT NO. FE18-06
2026-4964
Originator: Mike Dorman
MOVED, SECONDED, AND DULY CARRIED TO:
A. Receive and file Bid Tabulation and Recommendation for CenGen Instrument
Air Compressors Replacement at Plant No. 1, Project No. FE18-06;
B. Award a Construction Contract Agreement to LEED Electric, Inc., for CenGen
Instrument Air Compressors Replacement at Plant No. 1, Project No. FE18-06,
for a total amount not to exceed $911,678; and
C. Approve a contingency of $91,168 (10%).
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
Page 4 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
7.ENGINEERING PROGRAM CONTRACT PERFORMANCE REPORT 2026-4965
Originator: Mike Dorman
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the Engineering Program Contract Performance Report for the period
ending March 31, 2026.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
8.FULLERTON-PLACENTIA SEWER FACILITIES DEMOLITION AND
REHABILITATION, PROJECT NO. 2-73
2026-4966
Originator: Mike Dorman
MOVED, SECONDED, AND DULY CARRIED TO:
A. Approve a Professional Design Services Agreement with Kleinfelder, Inc., to
provide engineering services for Fullerton-Placentia Sewer Facilities Demolition
and Rehabilitation, Project No. 2-73, for an amount not to exceed $2,487,429;
and
B. Approve a contingency of $248,743 (10%).
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
9.GISLER-RED HILL INTERCEPTOR AND BAKER FORCE MAIN
REHABILITATION, PROJECT NO. 7-65
2026-4967
Originator: Mike Dorman
MOVED, SECONDED, AND DULY CARRIED TO:
Page 5 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
Approve a Contingency Increase of $ 296,538 (30%) to the existing Professional
Construction Services Agreement with CDM Smith, Inc. to provide construction support
services for Gisler-Red Hill Interceptor and Baker Force Main Rehabilitation, Project
No. 7-65, for a new total contingency amount of $395,384 (40%).
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
10.VALVE REPLACEMENTS AND WET WELL ACCESS
IMPROVEMENTS AT SLATER PUMP STATION, PROJECT NO.
FRC-0017
2026-4968
Originator: Mike Dorman
MOVED, SECONDED, AND DULY CARRIED TO:
A. Receive and file Bid Tabulation and Recommendation for Valve Replacements
and Wet Well Access Improvements at Slater Pump Station, Project No.
FRC-0017;
B. Award a Construction Contract Agreement to Steve P. Rados, Inc., for Valve
Replacements and Wet Well Access Improvements at Slater Pump Station,
Project No. FRC-0017, for a total amount not to exceed $2,624,000; and
C. Approve a contingency of $262,400 (10%).
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
Page 6 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
ADMINISTRATION COMMITTEE:
11.GANN APPROPRIATIONS LIMIT FOR FISCAL YEAR 2026-27 2026-4978
Originator: Wally Ritchie
MOVED, SECONDED, AND DULY CARRIED TO:
Adopt Resolution No. OC SAN 26-08, titled: “A Resolution of the Board of Directors of
the Orange County Sanitation District Establishing the Annual Appropriations Limit for
Fiscal Year 2026-27 for the Orange County Sanitation District in Accordance with the
Provisions of Division 9 of Title 1 of the California Government Code”.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
12.FY 2026-27 USE CHARGES FOR SANTA ANA WATERSHED
PROJECT AUTHORITY
2026-4979
Originator: Wally Ritchie
MOVED, SECONDED, AND DULY CARRIED TO:
Adopt Resolution No. OC SAN 26-09, titled: “A Resolution of the Board of Directors of
the Orange County Sanitation District Establishing Use Charges for the 2026-27 Fiscal
Year Pursuant to the Wastewater Treatment and Disposal Agreement with the Santa
Ana Watershed Project Authority (“SAWPA”)”.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
Page 7 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
13.SOLARWINDS SOFTWARE LICENSE AND SUPPORT AGREEMENT
RENEWAL
2026-4980
Originator: Wally Ritchie
MOVED, SECONDED, AND DULY CARRIED TO:
A. Approve a Purchase Order Contract to Insight Public Sector Inc. for the
purchase of the Solarwinds Software License and Support Agreement Renewal
for a three (3) year term using the Omnia Partners (COOB COUNTY) IT
Products and Services (23-6692-03), for a total amount not to exceed
$211,465.60 plus applicable sales tax; and
B. Approve a contingency in the amount of $21,147 (10%).
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
14.SERVICENOW SOFTWARE LICENSE AGREEMENT RENEWAL 2026-4981
Originator: Wally Ritchie
MOVED, SECONDED, AND DULY CARRIED TO:
A. Approve a Purchase Order for a one-year contract with Carahsoft for a software
license agreement with ServiceNow, utilizing the NASPO ValuePoint
Cooperative Purchasing Contract 7-17-70-40-05 for a total amount not to
exceed $594,536; and
B. Approve a contingency of $59,454 (10%).
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
Page 8 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
15.INLAND EMPIRE COMPOSTING AUTHORITY (IERCA) AGREEMENT 2026-4982
Originator: Lan Wiborg
MOVED, SECONDED, AND DULY CARRIED TO:
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
16.PUBLIC AFFAIRS UPDATE FOR THE MONTH OF MAY 2026 2026-4983
Originator: Jennifer Cabral
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the Public Affairs Update for the month of May 2026.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
17.LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF MAY 2026 2026-4984
Page 9 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
Originator: Jennifer Cabral
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the Legislative Affairs Update for the month of May 2026.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
18.BIOSOLIDS DEEP WELL INJECTION COMMUNICATIONS
CONSULTANT, SPECIFICATION NO. CS-2026-716BD
2026-4986
Originator: Jennifer Cabral
MOVED, SECONDED, AND DULY CARRIED TO:
A. Approve a Professional Consultant Services Agreement to S. Groner
Associates, Inc. (SGA) as a strategic communications consultant for the
Biosolids Deep Well Injection Project, Specification No. CS-2026-716BD for a
total amount not to exceed $903,421 for a three (3) year Agreement with two (2)
one-year renewal options;
B. Approve a contingency of $90,342 (10%); and
C. Approve an optional one time add on of $61,436 for the STEM-Integrated
Schools Outreach Program.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
19.REMOVALS TO THE PRE-APPROVED ORIGINAL EQUIPMENT
MANUFACTURER (OEM) SOLE SOURCE LIST
2026-4987
Originator: Wally Ritchie
MOVED, SECONDED, AND DULY CARRIED TO:
Page 10 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
Approve the following removals to the pre-approved OEM Sole Source List:
·Aanderaa Data Instruments - Current meters
·Additel Corporation - Digital Pressure Test Gauges for Bay Bridge Pump Station
·Alhambra Foundry - Manhole Frames & Covers
·Altronic - CenGen Engine Ignition Subsystem Components
·Ameron - Manhole Toppers
·AM-Liner - Sewer Lining
·Arc Wireless - Paging Services
·Ashbrook (Bellmer/Winkler) - Sludge belt filter presses
·Basler - Electrical protective relays and regulators
·BR Frost Company - Jaw Clutch Assemblies
·CECO Fybroc - Pumps and Parts
·Chemineer/NOV - Mixers
·Chevrolet - Trunk Engine Replacements
·Chevron - Chevron 5200 HDAX Low Ash 40 Lubricating Oil
·Cla-Val - Reclaim Plant water backup for plant water system
·Cleaver-Brooks - Burner elements
·CSI/Emerson - MSP vibrations
·Dr. Kristy Forsgren - Fish Liver Histopathology Analysis and Reporting
·Eaton - Self-Cleaning Strainers
·Eaton - Variable frequency drives for process pumps
·Electrabond - coating of belt filter press rollers
·Enfotech - Pre-Treatment Software
·Essco - Submersible Pumps
·Evident Scientific, Inc. - Olympus IPLEX GX Videoscope and related accessories
·First American Real Estate - Online geographic realquest report
·Ford Hall Company, Inc. - Weir Wolf/Algae Sweep Automation Cleaning Equipment
Parts and Service
·Gates Fiberglass Installers - On-site/Field Fiberglass tank and ducting repairs
·GE Inspection
·Golden Bell - Insect Control
·Gooch Thermal Systems, Inc. - Spiral Heat Exchangers
·Graham Corporation - Liquid Ring Pumps
·Groth Corporation - Flame Arrestors and Parts
·Guidance Software, Inc. - e-Discovery software
·Howden Roots/Turblex - Aeration blowers service
·Hydro Gate - Weir Gates & Parts
·Innovyze, Inc. - Hydraulic Monitoring and CCTV Data
·Integrated Turbo Machinery - Maintenance, repairs and service of steam turbine
multi-stage rotor
·Interscan/Gas Detection - 2 Point H2S Monitoring Systems
·Iopredict Inc. - Test validation for Lead Instrumentation, Instrumentation Techs 1 &
Page 11 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
II
·ITT Standard - Heat exchangers
·LECO - GC Time of Flight mass spectrometer
·M.K. Plastics Corporation - Flex connectors for foul air fans
·Marlow - Process Pumps
·McCrometer - MW510 Flowmeters
·Met-Pro Technologies dba HEE/DUALL - Trickling Filter Fans
·Midway Manufacturing & Machine - Custom brackets & fittings for vehicles/electric
carts and portable equipment
·Milton Roy - Pumps and Equipment
·Mobius Institute - Mobius iLearnReliability Enterprise Training Product
·Monterey Bay Aquarium Research Institute (MBARI) - Ocean Mooring Support
·Motorola, Inc. - Radios
·Moyno - Process Pumps
·Moyno - Pumps, Parts and Grinders
·Newport Dunes Resort and Marina - Marina Lease for Ocean Monitoring Program
(OMP) Vessel
·Nixon-Egli Equipment Co. - Modifications and Custom Equipment Installation on
Welder Service Truck
·Noria - Lube Awareness Training
·Nuttal Gear - Gear Drive Assembly and Related Parts/Equipment
·Oceco - Flame Arrestors on Digesters
·Orange County Muffler - Bumper Mounted Tire Recovery System
·Orange County Sheriff’s Department - Law Enforcement & Security Services
·Parkson - Washer Compactor
·Perkin Elmer - ICP Mass Spectrometer
·Philadelphia Mixing Solutions LLC - Parts for rebuild and repairs of gearbox for
Aeration Basins
·PlanetBids, Inc. - Online vendor and bid management
·Prominent Fluid Controls/PFC - Process metering pumps and drive assemblies
·Pulsafeeder - Ferric injection pumps
·Pulsafeeder - Pulsafeeder Engineered products and replacement parts for chemical
pump station
·Rand McNally - Thomas Bros Maps
·RBMWare - Software and 2310 vibration analyzers
·RBR - Electronic Water Quality Sensors
·Retrofit Services Company - HVAC Controls System Maintenance
·Rincon Truck Center - Diagnostics and Repairs of Diesel Engine Trucks
·Robicon - Variable frequency drives for pumps
·Rodney Hunt, Inc. - Diversion Gates and Actuators
·Saft America - UPS Batteries
·Sancon 100 Epoxy/Urethane - Coating System
·SANS - Vouchers for Cyber Security Training
·Schweitzer Engineering Laboratories - Equipment, materials, and services for
Page 12 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
electrical power system protective relays and load-shedding systems.
·SDT Ultrasound Solutions - SDT Ultrasound instruments, hardware and software
·Siemens Building Management System - Maintenance tech training for HVAC and
instrumentation departments
·Skalar - BOD Robotics
·Snap-On - Smog Machine Repair Service
·Sonetics - Wireless Headsets and System
·Southern California Coastal Water Research Project (SCCWRP) - Bight ’18
Biological Impacts Assessment
·Sparling Instruments - Process flowmeters
·SPX Flow/Lightnin - Gear Box repair parts, equipment and service
·Sulzer (Formerly ABS) - Pumps and Parts
·Thermo Electron - ICP Atomic Emission Spectrometer and GC Mass Spectrometer
·Tireshark - Traffic spikes
·Titus - Composite Manhole Covers
·Toshiba - HVK Circuit Breakers
·Trident - Actuate Parts and Repairs
·Trimble Water - Trimble Unity Software Licensing and Support
·Turvac - Alignment Certification Training
·Vapex Environmental Technologies - Sentinel Scrubber Monitor/Controller Products
·Vaughan - Pump Maintenance and Parts
·Verderflex
·Vision Internet Solutions - Internet Website
·Waterman Gates - Waterman engineered products, parts & equipment
·Waters Corporation - Liquid chromatograph mass spectrometer
·WSG & Solutions, Inc. - Grit Classifier Repair Parts
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
20.FY 2026-27 PROPERTY-LIABILITY INSURANCE RENEWALS 2026-4988
Originator: Wally Ritchie
MOVED, SECONDED, AND DULY CARRIED TO:
Page 13 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
Approve the Orange County Sanitation District FY 2026-27 Property-Liability Insurance
Renewals included in the FY 2026-27 and FY 2027-28 Budget for the not-to-exceed
amounts specified below:
Property and Boiler & Machinery - Not to Exceed $2,870,413
Excess General Liability Insurance - Not to Exceed $1,485,347
Excess Workers’ Compensation Insurance - Not to Exceed $ 518,000
Earthquake Insurance - Not to Exceed $ 166,381
Cyber Liability $ 159,829
TOTAL $5,199,970
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
21.INVEST AND/OR REINVEST ORANGE COUNTY SANITATION
DISTRICT’S FUNDS AND ADOPT INVESTMENT POLICY
STATEMENT
2026-4989
Originator: Wally Ritchie
MOVED, SECONDED, AND DULY CARRIED TO:
Adopt Resolution No. OC SAN 26-10 entitled: “A Resolution of the Board of Directors
of the Orange County Sanitation District, Authorizing the Orange County Sanitation
District’s Treasurer to Invest and/or Reinvest the Orange County Sanitation District’s
Funds, Adopting the Orange County Sanitation District’s Investment Policy Statement
and Performance Benchmarks, and Repealing Resolution No. OC SAN 25-20”.
STEERING COMMITTEE:
22.2026-4995
Originator: Wally Ritchie
MOVED, SECONDED, AND DULY CARRIED TO:
Page 14 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
Approve and authorize the General Manager to execute the Implementation Agreement
between Orange County Sanitation District and Irvine Ranch Water District, in a form
approved by General Counsel.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
23.AGREEMENT WITH IRVINE RANCH WATER DISTRICT MOOTING
DEFUNCT PRIOR CONTRACTS AND TERMINATING SURVIVAL
PROVISIONS
2026-4996
Originator: Mike Dorman
MOVED, SECONDED, AND DULY CARRIED TO:
Approve and authorize the General Manager to execute the Agreement Mooting
Defunct Prior Contracts and Terminating Survival Provisions between Orange County
Sanitation District and Irvine Ranch Water District, in a form approved by General
Counsel.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
24.GENERAL MANAGER’S FY 2025-2026 WORK PLAN YEAR-END
REPORT
2026-4997
Originator: Rob Thompson
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the General Manager’s FY 2025-2026 Work Plan Year-End Report.
Page 15 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
25.GENERAL MANAGER’S FY 2026-2027 WORK PLAN 2026-4998
Originator: Rob Thompson
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the General Manager’s FY2026-2027 Work Plan.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
Vice Chair Dumitru recessed the OC San Board of Directors Meeting at 6:33 p.m.
********************************************************************************************************
Page 16 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION MEETING
CALL TO ORDER:
Vice Chair Dumitru called the Board of Directors, Orange County Financing Corporation
meeting to order at 6:33 p.m.
ROLL CALL AND DECLARATION OF QUORUM:
Kelly Lore, Secretary of the Financing Corporation, declared a quorum present as follows:
PRESENT:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
APPROVAL OF MINUTES
FC-1 APPROVAL OF MINUTES - ORANGE COUNTY SANITATION
DISTRICT FINANCING CORPORATION
2026-4972
Originator: Kelly Lore
MOVED, SECONDED, AND DULY CARRIED TO:
Approve Minutes of the Regular meeting of the Orange County Sanitation District
Financing Corporation held September 24, 2025.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
Page 17 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
NON-CONSENT:
FC-2 2026-4761
Originator: Wally Ritchie
Director of Finance Wally Richie provided the annual status report.
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the Annual Status Report of the Orange County Sanitation District
Financing Corporation.
AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Jon Dumitru,
Johnathan Ryan Hernandez, Carlos Leon, Tom Lindsey, Christine
Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Robert
Ooten, Bonnie Peat, Jamie Valencia, Chad Wanke, Erik Weigand,
John Withers, Jordan Wu, Cindy Tran (Alternate), John Warren
(Alternate) and Ben Wong (Alternate)
NOES:None
ABSENT:Doug Chaffee, Ryan Gallagher and Melinda Liu
ABSTENTIONS:None
********************************************************************************************************
Page 18 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
Vice Chair Dumitru reconvened the Orange County Sanitation District Board of Directors
meeting at 6:36 p.m.
NON-CONSENT:
26.PROPOSED FISCAL YEAR 2026-27 AND FISCAL YEAR 2027-28
BUDGET
2026-4990
Originator: Wally Ritchie
Mr. Thompson provided a brief overview of the item.
MOVED, SECONDED, AND DULY CARRIED TO:
FY 2026-27 FY 2027-28
Net Operating $ 279,712,720 $ 291,268,126
Self-Insurance - Workers’ Comp.$ 1,568,000 $ 1,697,500
Self-Insurance - Property & Gen. Liability $ 4,991,970 $ 5,460,167
Net Capital Improvement Program $ 291,475,441 $ 313,540,607
Capital Equipment $ 19,445,729 $ 14,322,073
Debt/COP Service $ 60,972,861 $ 65,127,111
Reduction of Long-Term Liabilities $ 15,000,000 $ 15,000,000
Total $ 673,166,721 $ 706,415,584
INFORMATION ITEMS:
None.
AB 1234 DISCLOSURE REPORTS:
Directors Pat Burns, Andrew Nguyen, and Bob Ooten provided a report on their recent
attendance at various Regional Board Meetings.
Directors Debbie Baker and John Withers departed the meeting at 6:39 p.m.
CLOSED SESSION:
CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS
54956.9(d)(1) & 54956.9(d)(2).
The Board convened in closed session at 6:39 p.m. Confidential minutes of the Closed
Sessions have been prepared in accordance with the above Government Code Sections and
are maintained by the Clerk of the Board in the Official Book of Confidential Minutes of Board
and Committee Closed Session meetings.
Page 19 of 20
BOARD OF DIRECTORS Minutes June 24, 2026
CS-1 CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION -
GOVERNMENT CODE SECTION 54956.9(d)(1)
2026-4991
CONVENED IN CLOSED SESSION:
30-2024-01379706-CU-OR-CJC.
CS-2 CONFERENCE WITH LEGAL COUNSEL RE ANTICIPATED
LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(2)
2026-4992
CONVENED IN CLOSED SESSION:
Number of Potential Cases: (1)
Significant exposure to litigation.
RECONVENED IN REGULAR SESSION.
The Board reconvened in regular session at 7:22 p.m.
CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED
SESSION:
General Counsel Scott Smith stated there was no reportable action.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
At 7:23 p.m., Vice Chair Dumitru adjourned the meeting until the next Regular Meeting of the
Board of Directors to be held on Wednesday, July 22, 2026 at 6:00 p.m.
Submitted by:
__________________
Kelly A. Lore, MMC
Clerk of the Board
Page 20 of 20
BOARD OF DIRECTORS
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-4686 Agenda Date:7/22/2026 Agenda Item No:3.
FROM:Robert Thompson, General Manager
Originator: Kelly A. Lore, Clerk of the Board
SUBJECT:
COMMITTEE MEETING MINUTES
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Receive and file the following:
A. Minutes of the GWRS Committee Meeting held January 12, 2026
B. Minutes of the Steering Committee Meeting held May 27, 2026
C. Minutes of the Operations Committee Meeting held June 3, 2026
D. Minutes of the Administration Committee Meeting held June 10, 2026
BACKGROUND
In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting
will be provided to the Directors for subsequent approval at the following meeting.
RELEVANT STANDARDS
·Resolution No. OC SAN 24-09
ADDITIONAL INFORMATION
The minutes of the Committee meetings are approved at their respective Committees and brought
forth to the Board of Directors for receive and file only.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Minutes of the Monthly Committee Meetings
Orange County Sanitation District Printed on 7/13/2026Page 1 of 1
powered by Legistar™
MINUTES OF THE MEETING
GROUNDWATER REPLENISHMENT SYSTEM STEERING COMMITTEE
Monday, January 12, 2026
OC San Director Gallagher called the Groundwater Replenishment System Steering
Committee meeting to order in the OCWD Boardroom. Public access was also provided via
Zoom webinar. Following the Pledge of Allegiance to the flag, the Secretary called the roll and
reported a quorum.
OCWD Staff OC SAN Staff
John Kennedy, Mehul Patel, Gina Ayala,
Leticia Villarreal
Robert Thompson, Jennifer Cabral
Annual Reorganization of GWRS Steering Committee Officers
GWRS Steering Committee member Ryan Gallagher stated the Steering Committee
reorganizes on an annual basis. It was a consensus of the Committee members present to
approve the following nomination:
2026 GWRS Steering Committee Chair OCWD Director Cathy Green
2026 GWRS Steering Committee Vice Chair OC San Director Jon Dumitru
Director Green conducted the remainder of the meeting.
CONSENT CALENDAR
The Consent Calendar was moved, seconded and duly carried [5-0] as follows.
Yes Gallagher, Green, Wanke, Dumitru, Yoh
1. Minutes of Previous Meeting
The minutes of the GWRS Steering Committee meeting held July 14, 2025, are approved as
presented.
INFORMATIONAL ITEMS
3. GWRS Operations Update
Executive Director of Operations Mehul Patel reported that the daily production for the quarter,
October to December 2025, was 105 110 mgd. He stated that production was limited during
Committee Members
Ryan Gallagher
Cathy Green
Chad Wanke
Denis Bilodeau (absent)
Jon Dumitru
Van Tran
Alternates
Roger Yoh
Bob Ooten
Dina Nguyen (absent)
Andrew Nguyen
Fred Jung
Pat Burns
*OCWD Director Erik Weigand was also in attendance
2
this period due to rehab of product water pump A01. He reported that high groundwater levels
limited injection flows to seawater intrusion barrier and mid-basin well.
3. GWRS Fourth Quarter Outreach Report (October December 2025)
Director of Public Affairs Gina Ayala reported that for the fourth quarter of 2025 a total of 33
GWRS tours were conducted accounting for 760 guests. She reported that OCWD received
the Sustainable Water Utility Management Award from the Association of Metropolitan Water
Agencies for leadership in sustainable water management, including operation of the
Groundwater Replenishment System.
ADJOURNMENT
There being no further business to come before the Committee, the meeting was adjourned at
5:22 p.m.
OCWD Director Cathy Green, Chair
Orange County Sanitation District
Minutes for the
STEERING COMMITTEE
Wednesday, May 27, 2026
5:00 PM
Headquarters - Huntington Beach
Room
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
CALL TO ORDER
A regular meeting of the Steering Committee of the Orange County Sanitation District was
called to order by Board Chairman Ryan Gallagher on Wednesday, May 27, 2026 at 5:00
p.m. in the Orange County Sanitation District Headquarters.
ROLL CALL AND DECLARATION OF QUORUM:
The Clerk of the Board declared a quorum present as follows:
PRESENT:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine
Marick, Chad Wanke and John Withers
ABSENT:None
STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General
Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of
Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of
Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of
Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; Daisy Covarrubias; Don
Cutler; Thys DeVries; Martin Dix; Justin Fenton; John Frattali; Dave Haug; Rob Michaels;
Tania Moore; Becky Polcyn; Aldwin Ramirez; Thomas Vu; Kevin Work; and Ruth Zintzun
were present in the Huntington Beach Room. Jacob Dalgoff was present virtually.
OTHERS PRESENT: Scott Smith, General Counsel; and Phil Lem, Special Counsel, Payne
& Fears were present in the Huntington Beach Room.
PUBLIC COMMENTS:
None.
REPORTS:
Chair Gallagher and General Manager Rob Thompson did not provide reports.
CONSENT CALENDAR:
1.APPROVAL OF MINUTES 2026-4696
Originator: Kelly Lore
MOVED, SECONDED, AND DULY CARRIED TO:
Page 1 of 5
STEERING COMMITTEE Minutes May 27, 2026
Approve minutes of the Regular meeting of the Steering Committee held April 22,
2026.
AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine
Marick, Chad Wanke and John Withers
NOES:None
ABSENT:None
ABSTENTIONS:None
2.2026-2029 CONTRIBUTION TO THE CENTER FOR DEMOGRAPHIC
RESEARCH
2026-4835
Originator: Mike Dorman
Approve and authorize the General Manager to execute a three-year Memorandum of
Understanding with California State University Fullerton Auxiliary Services Corporation
for the continued operation of the Center for Demographic Research for the period of
July 1, 2026 through June 30, 2029, for a total amount not to exceed $243,236.
AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine
Marick, Chad Wanke and John Withers
NOES:None
ABSENT:None
ABSTENTIONS:None
NON-CONSENT:
3.PROPOSED ANNEXATION OF THE TERRITORY OF THE FORMER
LOS ALISOS WATER DISTRICT
2026-4896
Originator: Mike Dorman
Page 2 of 5
STEERING COMMITTEE Minutes May 27, 2026
A. Authorize staff to take all steps necessary to work with Irvine Ranch Water
District and the Orange County Local Agency Formation Commission to bring to
effect the annexation of the area serviced by the Los Alisos Water Recycling
Plant to Orane County Sanitation District;
B. Authorize the General Manager to execute associated Annexation documents in
a form approved by General Counsel; and
C. Adopt Resolution No. OC SAN 26-XX, entitled: “A Resolution of the Board of
Directors of the Orange County Sanitation District authorizing initiation of
proceedings and requesting the Orange County Local Agency Formation
Commission to undertake proceedings for the Annexation to the Orange County
Sanitation District, of territory in the Irvine Ranch Water District”.
AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine
Marick, Chad Wanke and John Withers
NOES:None
ABSENT:None
ABSTENTIONS:None
4.SUPERCRITICAL WATER OXIDATION DEMONSTRATION AT PLANT
NO. 1, PROJECT NO. RE21-01
2026-4942
Originator: Rob Thompson
Authorize the General Manager to modify the Professional Services Agreement to
374Water Systems, Inc. for the Supercritical Water Oxidation Demonstration at Plant
No. 1, Project No. RE21-01, to reduce the acceptance capacity of the Nix6 system to
3.25 tons per day from 6 tons per day, while 374Water Systems, Inc. continues to
make process improvements toward achieving the goal of 6 tons per day.
AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine
Marick, Chad Wanke and John Withers
NOES:None
ABSENT:None
ABSTENTIONS:None
5.GENERAL MANAGER’S FY 2026-2027 PROPOSED WORK PLAN 2026-4867
Originator: Rob Thompson
Page 3 of 5
STEERING COMMITTEE Minutes May 27, 2026
2026-2027 Proposed Work Plan.
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the General Manager’s FY2026-2027 Proposed Work Plan.
AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine
Marick, Chad Wanke and John Withers
NOES:None
ABSENT:None
ABSTENTIONS:None
INFORMATION ITEMS:
None.
DEPARTMENT HEAD REPORTS:
None.
CLOSED SESSION:
CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS
54956.9(D)(2) & 54956.9(D)(1).
CS-1 CONFERENCE WITH LEGAL COUNSEL RE ANTICIPATED
LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(2)
2026-4905
CONVENED IN CLOSED SESSION:
Number of Potential Cases: 1
Significant exposure to litigation.
CS-2 CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION -
GOVERNMENT CODE SECTION 54956.9(D)(1)
2026-4910
CONVENED IN CLOSED SESSION:
Number of Cases: 1
Michael Oberly v. Orange County Sanitation District and Does 1-25, Orange County
Superior Court Case No. 30-2025-01489491-CU-OE-CJC.
Page 4 of 5
STEERING COMMITTEE Minutes May 27, 2026
RECONVENED IN REGULAR SESSION.
The Committee reconvened in regular session at 5:47 p.m.
CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED
SESSION:
General Counsel Scott Smith did not provide a report.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
Chair Gallagher declared the meeting adjourned at 5:48 p.m. to the next Regular Steering
Committee meeting to be held on Wednesday, June 24, 2026 at 5:00 p.m.
Submitted by:
__________________
Kelly A. Lore, MMC
Clerk of the Board
Page 5 of 5
Orange County Sanitation District
Minutes for the
OPERATIONS COMMITTEE
Wednesday, June 3, 2026
5:00 PM
Headquarters - Board Room
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
CALL TO ORDER
A regular meeting of the Operations Committee of the Orange County Sanitation District was
called to order by Committee Chairman Pat Burns on Wednesday, June 3, 2026 at 5:00 p.m.
in the Orange County Sanitation District Headquarters. Committee Vice Chairman Carlos
Leon led the Pledge of Allegiance.
ROLL CALL AND DECLARATION OF QUORUM:
Assistant Clerk of the Board Tania Moore declared a quorum present as follows:
PRESENT:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher,
Johnathan Ryan Hernandez, Lisa Landau, Tom Lindsey, Carlos
Leon, Robert Ooten, Bonnie Peat, John Withers and Cindy Tran
(Alternate)
ABSENT:None
STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General
Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of
Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of
Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of
Environmental Services; Tania Moore, Assistant Clerk of the Board; Mo Abiodun; Daniel
Berokoff; Jon Bradley; Cheri Calisang; Mortimer Caparas; Sam Choi; Raul Cuellar; Don
Cutler; Thys DeVries; Martin Dix; Al Garcia; Shannon Garcia; David Haug; Mark Kawamoto;
Marianne Kleine; Janet Marroquin; Tom Meregillano; Nasrin Nasrollani; Kelly Newell; Andrew
Nguyen; Nick Oswald; Valerie Ratto; Thomas Vu; Todd Waltz; Kevin Work; Sammady Yi; and
Ruth Zintzun were present in the Board Room. Rich Leon was present virtually.
OTHERS PRESENT: Mal Richardson, General Counsel; was present in the Board Room.
PUBLIC COMMENTS:
None.
REPORTS:
Chair Burns and General Manager Rob Thompson did not provide reports.
Page 1 of 6
OPERATIONS COMMITTEE Minutes June 3, 2026
CONSENT CALENDAR:
1.APPROVAL OF MINUTES 2026-4723
Originator: Kelly Lore
MOVED, SECONDED, AND DULY CARRIED TO:
Approve minutes of the Regular meeting of the Operations Committee held May 6,
2026.
AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher,
Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat
and John Withers
NOES:None
ABSENT:Johnathan Ryan Hernandez and Cindy Tran (Alternate)
ABSTENTIONS:None
2.HEADWORKS STANDBY GENERATOR NO. 1 AND EPSA STANDBY
GENERATOR NO. 3 RADIATOR REPLACEMENTS AT PLANT NO. 2
(MP2-029), SPECIFICATION NO. S-2026-722BD
2026-4922
Originator: Riaz Moinuddin
A. Approve a General Services Contract to Minako America Corporation DBA
Minco Construction, for Headworks Standby Generator No. 1 and EPSA
Standby Generator No. 3 Radiator Replacements at Plant No. 2 (MP2-029),
Specification No. S-2026-722BD, for a total amount not to exceed $474,000;
and
B. Approve a contingency of $47,400 (10%).
AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher,
Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat
and John Withers
NOES:None
ABSENT:Johnathan Ryan Hernandez and Cindy Tran (Alternate)
ABSTENTIONS:None
3.CENGEN INSTRUMENT AIR COMPRESSORS REPLACEMENT AT
PLANT NO. 1, PROJECT NO. FE18-06
2022-2464
Originator: Mike Dorman
Page 2 of 6
OPERATIONS COMMITTEE Minutes June 3, 2026
A. Receive and file Bid Tabulation and Recommendation for CenGen Instrument
Air Compressors Replacement at Plant No. 1, Project No. FE18-06;
B. Award a Construction Contract Agreement to LEED Electric, Inc., for CenGen
Instrument Air Compressors Replacement at Plant No. 1, Project No. FE18-06,
for a total amount not to exceed $911,678; and
C. Approve a contingency of $91,168 (10%).
AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher,
Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat
and John Withers
NOES:None
ABSENT:Johnathan Ryan Hernandez and Cindy Tran (Alternate)
ABSTENTIONS:None
4.ENGINEERING PROGRAM CONTRACT PERFORMANCE REPORT 2026-4717
Originator: Mike Dorman
Receive and file the Engineering Program Contract Performance Report for the period
ending March 31, 2026.
AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher,
Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat
and John Withers
NOES:None
ABSENT:Johnathan Ryan Hernandez and Cindy Tran (Alternate)
ABSTENTIONS:None
NON-CONSENT:
Alternate Director Cindy Tran arrived at the meeting at 5:07 p.m.
5.FULLERTON-PLACENTIA SEWER FACILITIES DEMOLITION AND
REHABILITATION, PROJECT NO. 2-73
2025-4183
Originator: Mike Dorman
Page 3 of 6
OPERATIONS COMMITTEE Minutes June 3, 2026
contract negotiations, and the recommendation.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Approve a Professional Design Services Agreement with Kleinfelder, Inc., to
provide engineering services for Fullerton-Placentia Sewer Facilities Demolition
and Rehabilitation, Project No. 2-73, for an amount not to exceed $2,487,429;
and
B. Approve a contingency of $248,743 (10%).
AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher,
Lisa Landau, Tom Lindsey, Carlos Leon, Robert Ooten, Bonnie Peat,
John Withers and Cindy Tran (Alternate)
NOES:None
ABSENT:Johnathan Ryan Hernandez
ABSTENTIONS:None
Director Johnathan Ryan Hernandez arrived at the meeting at 5:14 p.m.
6.GISLER-RED HILL INTERCEPTOR AND BAKER FORCE MAIN
REHABILITATION, PROJECT NO. 7-65
2026-4925
Originator: Mike Dorman
Approve a Contingency Increase of $ 296,538 (30%) to the existing Professional
Construction Services Agreement with CDM Smith, Inc. to provide construction support
services for Gisler-Red Hill Interceptor and Baker Force Main Rehabilitation, Project
No. 7-65, for a new total contingency amount of $395,384 (40%).
AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher,
Johnathan Ryan Hernandez, Lisa Landau, Tom Lindsey, Carlos
Leon, Robert Ooten, Bonnie Peat, John Withers and Cindy Tran
(Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
Page 4 of 6
OPERATIONS COMMITTEE Minutes June 3, 2026
7.VALVE REPLACEMENTS AND WET WELL ACCESS
IMPROVEMENTS AT SLATER PUMP STATION, PROJECT NO.
FRC-0017
2025-4178
Originator: Mike Dorman
A. Receive and file Bid Tabulation and Recommendation for Valve Replacements
and Wet Well Access Improvements at Slater Pump Station, Project No.
FRC-0017;
B. Award a Construction Contract Agreement to Steve P. Rados, Inc., for Valve
Replacements and Wet Well Access Improvements at Slater Pump Station,
Project No. FRC-0017, for a total amount not to exceed $2,624,000; and
C. Approve a contingency of $262,400 (10%).
AYES:Joyce Ahn, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher,
Johnathan Ryan Hernandez, Lisa Landau, Tom Lindsey, Carlos
Leon, Robert Ooten, Bonnie Peat, John Withers and Cindy Tran
(Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
INFORMATION ITEMS:
8.FY 2026-27 AND 2027-28 BUDGET PRESENTATION 2026-4941
Originator: Wally Ritchie
Page 5 of 6
OPERATIONS COMMITTEE Minutes June 3, 2026
Information Item.
DEPARTMENT HEAD REPORTS:
None.
CLOSED SESSION:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
Chair Burns declared the meeting adjourned at 5:43 p.m. to the next Regular Operations
Committee meeting to be held on Wednesday, July 1, 2026 at 5:00 p.m.
Submitted by:
_____________________
Tania Moore, CMC
Assistant Clerk of the Board
Page 6 of 6
Orange County Sanitation District
Minutes for the
ADMINISTRATION COMMITTEE
Wednesday, June 10, 2026
5:00 PM
Headquarters - Board Room
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
CALL TO ORDER
A regular meeting of the Administration Committee of the Orange County Sanitation District
was called to order by Committee Chairwoman Christine Marick on Wednesday, June 10,
2026 at 5:01 p.m. in the Orange County Sanitation District Headquarters. Board Vice Chair
Jon Dumitru led the Pledge of Allegiance.
ROLL CALL AND DECLARATION OF QUORUM:
Assistant Clerk of the Board Tania Moore declared a quorum present as follows:
PRESENT:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
ABSENT:None
STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General
Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of
Engineering; Laura Maravilla, Director of Human Resources; Wally Ritchie, Director of
Finance; Lan Wiborg, Director of Environmental Services; Tania Moore, Assistant Clerk of the
Board; Mo Abiodun; Jackie Castro; Sam Choi; Daisy Covarrubias; Thys DeVries; Al Garcia;
David Haug; Mark Kawamoto; Rebecca Long; Tom Meregillano; Rob Michaels; Aldwin
Ramirez; Don Stokes; Thomas Vu; Kevin Work; and Ruth Zintzun were present in the Board
Room.
OTHERS PRESENT: Scott Smith, General Counsel was present in the Board Room. Eric
Sapirstein, ENS Resources was present virtually.
PUBLIC COMMENTS:
None.
REPORTS:
Chair Marick announced that OC San Administrative Offices will be closed on Friday, July 3,
2026 in observance of Independence Day.
General Manager Rob Thompson did not provide a report.
Page 1 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
CONSENT CALENDAR:
1. APPROVAL OF MINUTES 2026-4733
Originator: Kelly Lore
MOVED, SECONDED, AND DULY CARRIED TO:
Approve minutes of the Regular meeting of the Administration Committee held May 13,
2026.
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
2. GANN APPROPRIATIONS LIMIT FOR FISCAL YEAR 2026-27 2026-4754
Originator: Wally Ritchie
Adopt Resolution No. OC SAN 26-XX, titled: “A Resolution of the Board of Directors of
the Orange County Sanitation District Establishing the Annual Appropriations Limit for
Fiscal Year 2026-27 for the Orange County Sanitation District in Accordance with the
Provisions of Division 9 of Title 1 of the California Government Code”.
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
3. FY 2026-27 USE CHARGES FOR SANTA ANA WATERSHED
PROJECT AUTHORITY
2026-4759
Originator: Wally Ritchie
Page 2 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
Adopt Resolution No. OC SAN 26-XX, titled: “A Resolution of the Board of Directors of
the Orange County Sanitation District Establishing Use Charges for the 2026-27 Fiscal
Year Pursuant to the Wastewater Treatment and Disposal Agreement with the Santa
Ana Watershed Project Authority (“SAWPA”)”.
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
4. SOLARWINDS SOFTWARE LICENSE AND SUPPORT AGREEMENT
RENEWAL
2026-4902
Originator: Wally Ritchie
A. Approve a Purchase Order Contract to Insight Public Sector Inc. for the
purchase of the Solarwinds Software License and Support Agreement Renewal
for a three (3) year term using the Omnia Partners (COOB COUNTY) IT
Products and Services (23-6692-03), for a total amount not to exceed
$211,465.60 plus applicable sales tax; and
B. Approve a contingency in the amount of $21,147 (10%).
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
5. SERVICENOW SOFTWARE LICENSE AGREEMENT RENEWAL 2026-4924
Originator: Wally Ritchie
Page 3 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
A. Approve a Purchase Order for a one-year contract with Carahsoft for a software
license agreement with ServiceNow, utilizing the NASPO ValuePoint
Cooperative Purchasing Contract 7-17-70-40-05 for a total amount not to
exceed $594,536; and
B. Approve a contingency of $59,454 (10%).
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
6. INLAND EMPIRE COMPOSTING AUTHORITY (IERCA) AGREEMENT 2026-4920
Originator: Lan Wiborg
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
7. PUBLIC AFFAIRS UPDATE FOR THE MONTH OF MAY 2026 2026-4950
Originator: Jennifer Cabral
Page 4 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
Directors to:
Receive and file the Public Affairs Update for the month of May 2026.
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
NON-CONSENT:
Director Chad Wanke left the room at 5:11 p.m.
8. LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF MAY 2026 2026-4940
Originator: Jennifer Cabral
Receive and file the Legislative Affairs Update for the month of May 2026.
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Erik Weigand, Jordan Wu and Tanya Doby
(Alternate)
NOES:None
ABSENT:Chad Wanke
ABSTENTIONS:None
Director Wanke returned to the room at 5:16 p.m.
9. BIOSOLIDS DEEP WELL INJECTION COMMUNICATIONS
CONSULTANT, SPECIFICATION NO. CS-2026-716BD
2026-4921
Originator: Jennifer Cabral
Page 5 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
A. Approve a Professional Consultant Services Agreement to S. Groner
Associates, Inc. (SGA) as a strategic communications consultant for the
Biosolids Deep Well Injection Project, Specification No. CS-2026-716BD for a
total amount not to exceed $903,421 for a three (3) year Agreement with two (2)
one-year renewal options; and
B. Approve a contingency of $90,342 (10%).
C. Approve an optional one time add on of $61,436 for the STEM-Integrated
Schools Outreach Program.
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
10. REMOVALS TO THE PRE-APPROVED ORIGINAL EQUIPMENT
MANUFACTURER (OEM) SOLE SOURCE LIST
2026-4958
Originator: Wally Ritchie
Page 6 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
Approve the following removals to the pre-approved OEM Sole Source List:
·Aanderaa Data Instruments - Current meters
·Additel Corporation - Digital Pressure Test Gauges for Bay Bridge Pump Station
·Alhambra Foundry - Manhole Frames & Covers
·Altronic - CenGen Engine Ignition Subsystem Components
·Ameron - Manhole Toppers
·AM-Liner - Sewer Lining
·Arc Wireless - Paging Services
·Ashbrook (Bellmer/Winkler) - Sludge belt filter presses
·Basler - Electrical protective relays and regulators
·BR Frost Company - Jaw Clutch Assemblies
·CECO Fybroc - Pumps and Parts
·Chemineer/NOV - Mixers
·Chevrolet - Trunk Engine Replacements
·Chevron - Chevron 5200 HDAX Low Ash 40 Lubricating Oil
·Cla-Val - Reclaim Plant water backup for plant water system
·Cleaver-Brooks - Burner elements
·CSI/Emerson - MSP vibrations
·Dr. Kristy Forsgren - Fish Liver Histopathology Analysis and Reporting
·Eaton - Self-Cleaning Strainers
·Eaton - Variable frequency drives for process pumps
·Electrabond - coating of belt filter press rollers
·Enfotech - Pre-Treatment Software
·Essco - Submersible Pumps
·Evident Scientific, Inc. - Olympus IPLEX GX Videoscope and related accessories
·First American Real Estate - Online geographic realquest report
·Ford Hall Company, Inc. - Weir Wolf/Algae Sweep Automation Cleaning Equipment
Parts and Service
·Gates Fiberglass Installers - On-site/Field Fiberglass tank and ducting repairs
·GE Inspection
·Golden Bell - Insect Control
·Gooch Thermal Systems, Inc. - Spiral Heat Exchangers
·Graham Corporation - Liquid Ring Pumps
·Groth Corporation - Flame Arrestors and Parts
·Guidance Software, Inc. - e-Discovery software
·Howden Roots/Turblex - Aeration blowers service
·Hydro Gate - Weir Gates & Parts
·Innovyze, Inc. - Hydraulic Monitoring and CCTV Data
·Integrated Turbo Machinery - Maintenance, repairs and service of steam turbine
multi-stage rotor
·Interscan/Gas Detection - 2 Point H2S Monitoring Systems
·Iopredict Inc. - Test validation for Lead Instrumentation, Instrumentation Techs 1 &
Page 7 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
II
·ITT Standard - Heat exchangers
·LECO - GC Time of Flight mass spectrometer
·M.K. Plastics Corporation - Flex connectors for foul air fans
·Marlow - Process Pumps
·McCrometer - MW510 Flowmeters
·Met-Pro Technologies dba HEE/DUALL - Trickling Filter Fans
·Midway Manufacturing & Machine - Custom brackets & fittings for vehicles/electric
carts and portable equipment
·Milton Roy - Pumps and Equipment
·Mobius Institute - Mobius iLearnReliability Enterprise Training Product
·Monterey Bay Aquarium Research Institute (MBARI) - Ocean Mooring Support
·Motorola, Inc. - Radios
·Moyno - Process Pumps
·Moyno - Pumps, Parts and Grinders
·Newport Dunes Resort and Marina - Marina Lease for Ocean Monitoring Program
(OMP) Vessel
·Nixon-Egli Equipment Co. - Modifications and Custom Equipment Installation on
Welder Service Truck
·Noria - Lube Awareness Training
·Nuttal Gear - Gear Drive Assembly and Related Parts/Equipment
·Oceco - Flame Arrestors on Digesters
·Orange County Muffler - Bumper Mounted Tire Recovery System
·Orange County Sheriff’s Department - Law Enforcement & Security Services
·Parkson - Washer Compactor
·Perkin Elmer - ICP Mass Spectrometer
·Philadelphia Mixing Solutions LLC - Parts for rebuild and repairs of gearbox for
Aeration Basins
·PlanetBids, Inc. - Online vendor and bid management
·Prominent Fluid Controls/PFC - Process metering pumps and drive assemblies
·Pulsafeeder - Ferric injection pumps
·Pulsafeeder - Pulsafeeder Engineered products and replacement parts for chemical
pump station
·Rand McNally - Thomas Bros Maps
·RBMWare - Software and 2310 vibration analyzers
·RBR - Electronic Water Quality Sensors
·Retrofit Services Company - HVAC Controls System Maintenance
·Rincon Truck Center - Diagnostics and Repairs of Diesel Engine Trucks
·Robicon - Variable frequency drives for pumps
·Rodney Hunt, Inc. - Diversion Gates and Actuators
·Saft America - UPS Batteries
·Sancon 100 Epoxy/Urethane - Coating System
·SANS - Vouchers for Cyber Security Training
·Schweitzer Engineering Laboratories - Equipment, materials, and services for
Page 8 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
electrical power system protective relays and load-shedding systems.
·SDT Ultrasound Solutions - SDT Ultrasound instruments, hardware and software
·Siemens Building Management System - Maintenance tech training for HVAC and
instrumentation departments
·Skalar - BOD Robotics
·Snap-On - Smog Machine Repair Service
·Sonetics - Wireless Headsets and System
·Southern California Coastal Water Research Project (SCCWRP) - Bight ’18
Biological Impacts Assessment
·Sparling Instruments - Process flowmeters
·SPX Flow/Lightnin - Gear Box repair parts, equipment and service
·Sulzer (Formerly ABS) - Pumps and Parts
·Thermo Electron - ICP Atomic Emission Spectrometer and GC Mass Spectrometer
·Tireshark - Traffic spikes
·Titus - Composite Manhole Covers
·Toshiba - HVK Circuit Breakers
·Trident - Actuate Parts and Repairs
·Trimble Water - Trimble Unity Software Licensing and Support
·Turvac - Alignment Certification Training
·Vapex Environmental Technologies - Sentinel Scrubber Monitor/Controller Products
·Vaughan - Pump Maintenance and Parts
·Verderflex
·Vision Internet Solutions - Internet Website
·Waterman Gates - Waterman engineered products, parts & equipment
·Waters Corporation - Liquid chromatograph mass spectrometer
·WSG & Solutions, Inc. - Grit Classifier Repair Parts
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
11. FY 2026-27 PROPERTY-LIABILITY INSURANCE RENEWALS 2026-4755
Originator: Wally Ritchie
Page 9 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
Approve the Orange County Sanitation District FY 2026-27 Property-Liability Insurance
Renewals included in the FY 2026-27 and FY 2027-28 Budget for the not-to-exceed
amounts specified below:
Property and Boiler & Machinery - Not to Exceed $2,870,413
Excess General Liability Insurance - Not to Exceed $1,485,347
Excess Workers’ Compensation Insurance - Not to Exceed $ 518,000
Earthquake Insurance - Not to Exceed $ 166,381
Cyber Liability $ 159,829
TOTAL $5,199,970
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
12. INVEST AND/OR REINVEST ORANGE COUNTY SANITATION
DISTRICT’S FUNDS AND ADOPT INVESTMENT POLICY
STATEMENT
2026-4757
Originator: Wally Ritchie
Recommend to the Board of Directors to:
Adopt Resolution No. OC SAN 26-XX entitled: “A Resolution of the Board of Directors
of the Orange County Sanitation District, Authorizing the Orange County Sanitation
District’s Treasurer to Invest and/or Reinvest the Orange County Sanitation District’s
Funds, Adopting the Orange County Sanitation District’s Investment Policy Statement
and Performance Benchmarks, and Repealing Resolution No. OC SAN 25-20”.
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
Page 10 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
13. PROPOSED FISCAL YEAR 2026-27 AND FISCAL YEAR 2027-28
BUDGET
2026-4758
Originator: Wally Ritchie
FY 2026-27 FY 2027-28
Net Operating $ 279,712,720 $ 291,268,126
Self-Insurance - Workers’ Comp.$ 1,568,000 $ 1,697,500
Self-Insurance - Property & Gen. Liability $ 4,991,970 $ 5,460,167
Net Capital Improvement Program $ 291,475,441 $ 313,540,607
Capital Equipment $ 19,445,729 $ 14,322,073
Debt/COP Service $ 60,972,861 $ 65,127,111
Reduction of Long-Term Liabilities $ 15,000,000 $ 15,000,000
Total $ 673,166,721 $ 706,415,584
AYES:Debbie Baker, Ted Bui, Jon Dumitru, Ryan Gallagher, Melinda Liu,
Christine Marick, Jose Medrano, Andrew Nguyen, David Shawver,
Jamie Valencia, Chad Wanke, Erik Weigand, Jordan Wu and Tanya
Doby (Alternate)
NOES:None
ABSENT:None
ABSTENTIONS:None
INFORMATION ITEMS:
None.
DEPARTMENT HEAD REPORTS:
None.
Page 11 of 12
ADMINISTRATION
COMMITTEE
Minutes June 10, 2026
CLOSED SESSION:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
Chair Marick declared the meeting adjourned at 5:40 p.m. to the next Regular Administration
Committee meeting to be held on Wednesday, July 8, 2026 at 5:00 p.m.
Submitted by:
_____________________
Tania Moore, CMC
Assistant Clerk of the Board
Page 12 of 12
BOARD OF DIRECTORS
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-4762 Agenda Date:7/22/2026 Agenda Item No:4.
FROM:Robert Thompson, General Manager
Originator: Wally Ritchie, Director of Finance
SUBJECT:
REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF JUNE 2026
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Receive and file the following:
Report of the Investment Transactions for the month of June 2026.
BACKGROUND
The California Government Code requires that a monthly report of investment transactions be
provided to the legislative body.Attached is the monthly report of investment transactions for the
month ended June 30, 2026.
RELEVANT STANDARDS
·Comply with California Government Code Section 53607
PRIOR COMMITTEE/BOARD ACTIONS
N/A
FINANCIAL CONSIDERATIONS
N/A
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Report of the Investment Transactions - June 2026
Orange County Sanitation District Printed on 7/13/2026Page 1 of 1
powered by Legistar™
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
Account Beginning Cash Principal Cash: -
26,869,571.96
Income Cash:
26,869,571.96
Total Cash: -
01-Jun-
26
01-Jun-26 313385XN
1
I 310 INTEREST EARNED ON F
H L B DISC NTS
6/01/26 $1 PV ON
218000.0000 SHARES
DUE 6/1/2026 218,000
PAR VALUE AT 100 %
-----128.98 ---SEI
01-Jun-
26
01-Jun-26 313385XN
1
I 310 INTEREST EARNED ON F
H L B DISC NTS
6/01/26 $1 PV ON
3700000.0000 SHARES
DUE 6/1/2026 3,700,000
PAR VALUE AT 100 %
-----11,501.86 ---SEI
01-Jun-
26
01-Jun-26 313589XN
8
I 310 INTEREST EARNED ON F
N M A DISC NT
6/01/26 $1 PV ON
100000.0000 SHARES
DUE 6/1/2026 100,000
PAR VALUE AT 100 %
-----59.33 ---SEI
01-Jun-
26
01-Jun-26 14912EF
10
I 310 INTEREST EARNED ON
CATERPILLAR FINL SVCS
C P 6/01/26 $1 PV ON
5025000.0000 SHARES
DUE 6/1/2026 5,025,000
PAR VALUE AT 100 %
-----7,132.71 ---SEI
01-Jun-
26
01-Jun-26 756109BF
0
I 310 INTEREST EARNED ON
REALTY INCOME CORP
4.875% 6/01/26 $1 PV ON
1012000.0000 SHARES
DUE 6/1/2026
-----24,667.50 ---SEI
01-Jun-
26
01-Jun-26 3134A1Z
60
I 310 INTEREST EARNED ON F
H L M C M T N 6.930%
6/01/26 $1 PV ON
1775000.0000 SHARES
DUE 6/1/2026
-----61,503.75 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 1 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
01-Jun-
26
01-Jun-26 369550BN
7
I 310 INTEREST EARNED ON
GENERAL DYNAMICS
1.150% 6/01/26 $1 PV ON
1677000.0000 SHARES
DUE 6/1/2026
-----9,642.75 ---SEI
01-Jun-
26
01-Jun-26 828807CY
1
I 310 INTEREST EARNED ON
SIMON PROPERTY
GROUP 3.250% 11/30/26
$1 PV ON 1000000.0000
SHARES DUE 5/30/2026
-----16,250.00 ---SEI
01-Jun-
26
01-Jun-26 P 210 CASH DISBURSEMENT
PAID TO ORANGE
COUNTY SANITATION
DISTRICT OUTGOING
DOMESTIC WIRE
TRANSFER FROM LIQUID
OPERATING PORTFOLIO
------
40,000,000.00
---SEI
01-Jun-
26
01-Jun-26 912797UA
3
I 310 INTEREST EARNED ON U
S TREASURY BILL
6/16/26 $1 PV ON
600000.0000 SHARES
DUE 6/1/2026 600,000
PAR VALUE AT
99.84902167 %
-----6,108.28 ---SEI
01-Jun-
26
01-Jun-26 31846V567
FGZXX
I 310 INTEREST EARNED ON
FIRST AM GOVT OB FD
CL Z UNIT ON 0.0000
SHARES DUE 5/31/2026
INTEREST FROM 5/1/26
TO 5/31/26
-----9,825.98 ---SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 756109BF
0
P 20 MATURED PAR VALUE
OF REALTY INCOME
CORP 4.875% 6/01/26
1,012,000 PAR VALUE AT
100 %
-
1,012,000.000
0
100.0
000
---1,012,000.00 -
1,012,203.47
-203.47 -SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 2 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
01-Jun-
26
01-Jun-
26
01-Jun-26 313385XN
1
P 20 MATURED PAR VALUE
OF F H L B DISC NTS
6/01/26 218,000 PAR
VALUE AT 100 %
-218,000.0000 100.0
000
---217,871.02 -217,871.02 --SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 14912EF
10
P 20 MATURED PAR VALUE
OF CATERPILLAR FINL
SVCS C P 6/01/26
5,025,000 PAR VALUE AT
100 %
-
5,025,000.000
0
100.0
000
---5,017,867.29 -
5,017,867.29
--SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 3134A1Z
60
P 20 MATURED PAR VALUE
OF F H L M C M T N
6.930% 6/01/26 1,775,000
PAR VALUE AT 100 %
-
1,775,000.000
0
100.0
000
---1,775,000.00 -
1,810,869.85
-35,869.85 -SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 369550BN
7
P 20 MATURED PAR VALUE
OF GENERAL DYNAMICS
1.150% 6/01/26
1,677,000 PAR VALUE AT
100 %
-
1,677,000.000
0
100.0
000
---1,677,000.00 -
1,649,617.71
27,382.29 -SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 313385XN
1
P 20 MATURED PAR VALUE
OF F H L B DISC NTS
6/01/26 3,700,000 PAR
VALUE AT 100 %
-
3,700,000.000
0
100.0
000
---3,688,498.14 -
3,688,498.14
--SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 313589XN
8
P 20 MATURED PAR VALUE
OF F N M A DISC NT
6/01/26 100,000 PAR
VALUE AT 100 %
-100,000.0000 100.0
000
---99,940.67 -99,940.67 --SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
13,619,064.00
00
-----
13,619,064.00
13,619,064.0
0
--SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
39,400,905.87
00
----39,400,905.87 -
39,400,905.8
7
--SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 3 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
03-Jun-
26
03-Jun-26 3133ERGC
9
FFC4926
I 310 INTEREST EARNED ON F
F C B DEB 3.72043%
6/03/26 $1 PV ON
700000.0000 SHARES
DUE 6/3/2026
-----6,655.44 ---SEI
03-Jun-
26
15-May-
26
15-May-26 3130B9EK
2
P 10 PURCHASED PAR VALUE
OF F H L B DEB
3.560% 6/08/26
/BARCLAYS CAPITAL INC.
FIXED IN/1,000,000 PAR
VALUE AT 99.99836 %
1,000,000.000
0
99.99
84
----999,983.60 999,983.60 --SEI
03-Jun-
26
02-Jun-
26
03-Jun-26 912797UC
9
P 10 PURCHASED PAR VALUE
OF U S TREASURY BILL
6/30/26 /BMO-
CHICAGO
BRANCH/2,900,000 PAR
VALUE AT 99.7276 %
2,900,000.000
0
99.72
76
----2,892,100.40 2,892,100.40 --SEI
03-Jun-
26
02-Jun-
26
03-Jun-26 912797TY
3
P 10 PURCHASED PAR VALUE
OF U S TREASURY BILL
8/27/26 /J.P.
MORGAN SECURITIES
LLC/1,975,000 PAR
VALUE AT 99.14681266 %
1,975,000.000
0
99.14
68
----1,958,149.55 1,958,149.55 --SEI
03-Jun-
26
02-Jun-
26
03-Jun-26 912797UU
9
P 20 SOLD PAR VALUE OF U S
TREASURY BILL
8/18/26 /BMO-CHICAGO
BRANCH/2,000,000 PAR
VALUE AT 99.238839 %
-
2,000,000.000
0
99.23
88
---1,976,793.56 -
1,976,793.56
--SEI
03-Jun-
26
03-Jun-
26
03-Jun-26 3133ERGC
9
FFC4926
P 20 MATURED PAR VALUE
OF F F C B DEB
3.72043% 6/03/26 700,000
PAR VALUE AT 100 %
-700,000.0000 100.0
000
---700,000.00 -700,198.80 -198.80 -SEI
03-Jun-
26
03-Jun-
26
03-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
2,158,817.730
0
----2,158,817.73 -
2,158,817.73
--SEI
03-Jun-
26
03-Jun-
26
03-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-26,168.5700 ----26,168.57 -26,168.57 --SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 5 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
Post Date 03-Jun-26 Total ----980,685.03 988,254.89 -198.80 -SEI
04-Jun-
26
15-May-26 3130B9EK
2
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L B
DEB 3.560% 6/08/26
-----6,945.44 ---SEI
04-Jun-
26
04-Jun-26 17325FBC
1
I 310 INTEREST EARNED ON
CITIBANK N A SR NT
5.488% 12/04/26 $1 PV ON
1000000.0000 SHARES
DUE 6/4/2026
-----27,440.00 ---SEI
04-Jun-
26
15-May-
26
15-May-26 3130B9EK
2
P 10 PURCHASE-REV PAR
VALUE OF F H L B DEB
3.560% 6/08/26
/BARCLAYS CAPITAL INC.
FIXED IN/1,000,000 PAR
VALUE AT 99.99836 %
-
1,000,000.000
0
99.99
84
---999,983.60 -999,983.60 --SEI
04-Jun-
26
04-Jun-
26
04-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
53,684.0100 -----53,684.01 53,684.01 --SEI
Post Date 04-Jun-26 Total ---980,685.03 -946,299.59 --SEI
08-Jun-
26
08-Jun-26 3130B9EK
2
I 310 INTEREST EARNED ON F
H L B DEB 3.560%
6/08/26 $1 PV ON
1000000.0000 SHARES
DUE 6/8/2026
-----9,253.33 ---SEI
08-Jun-
26
08-Jun-
26
08-Jun-26 3130B9EK
2
P 20 MATURED PAR VALUE
OF F H L B DEB
3.560% 6/08/26 1,000,000
PAR VALUE AT 100 %
-
1,000,000.000
0
100.0
000
---1,000,000.00 -999,983.60 16.40 -SEI
08-Jun-
26
08-Jun-
26
08-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
1,000,000.000
0
-----1,000,000.00 1,000,000.00 --SEI
08-Jun-
26
08-Jun-
26
08-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
1,039,785.920
0
----1,039,785.92 -
1,039,785.92
--SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 6 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
08-Jun-
26
08-Jun-
26
08-Jun-26 14912EFH
5
P 10 PURCHASED PAR VALUE
OF CATERPILLAR FINL
SVCS C P 6/17/26
/BARCLAYS CAPITAL INC.
FIXED IN/1,050,000 PAR
VALUE AT 99.9085 %
1,050,000.000
0
99.90
85
----1,049,039.25 1,049,039.25 --SEI
Post Date 08-Jun-26 Total ----9,269.73 16.40 -SEI
09-Jun-
26
09-Jun-26 59166HF
94
I 310 INTEREST EARNED ON
METLIFE SHORT TERM
FDG C P 6/09/26 $1 PV
ON 1400000.0000
SHARES DUE 6/9/2026
1,400,000 PAR VALUE AT
100 %
-----14,168.00 ---SEI
09-Jun-
26
09-Jun-26 64952WED
1
I 310 INTEREST EARNED ON
NEW YORK LIFE MTN
1.150% 6/09/26 $1 PV ON
173000.0000 SHARES
DUE 6/9/2026 INT ON
MATU 6/9
-----994.75 ---SEI
09-Jun-
26
09-Jun-26 912797UA
3
I 310 INTEREST EARNED ON U
S TREASURY BILL
6/16/26 $1 PV ON
6500000.0000 SHARES
DUE 6/9/2026 6,500,000
PAR VALUE AT
99.93031108 %
-----24,409.29 ---SEI
09-Jun-
26
08-Jun-
26
09-Jun-26 912797VK
0
P 10 PURCHASED PAR VALUE
OF U S TREASURY BILL
10/06/26 /BMO-
CHICAGO
BRANCH/1,550,000 PAR
VALUE AT 98.79446387 %
1,550,000.000
0
98.79
45
----1,531,314.19 1,531,314.19 --SEI
09-Jun-
26
09-Jun-
26
09-Jun-26 64952WED
1
P 20 MATURED PAR VALUE
OF NEW YORK LIFE MTN
1.150% 6/09/26 173,000
PAR VALUE AT 100 %
-173,000.0000 100.0
000
---173,000.00 -171,738.83 1,261.17 -SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 7 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
09-Jun-
26
09-Jun-
26
09-Jun-26 59166HF
94
P 20 MATURED PAR VALUE
OF METLIFE SHORT
TERM FDG C P 6/09/26
1,400,000 PAR VALUE AT
100 %
-
1,400,000.000
0
100.0
000
---1,385,832.00 -
1,385,832.00
--SEI
09-Jun-
26
09-Jun-
26
09-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
41,685.8100 -----41,685.81 41,685.81 --SEI
09-Jun-
26
09-Jun-
26
09-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-39,550.7800 ----39,550.78 -39,550.78 --SEI
09-Jun-
26
09-Jun-
26
09-Jun-26 16677KFW
8
P 10 PURCHASED PAR VALUE
OF CHEVRON CORP
DISC COML C P 6/30/26
/BOFA SECURITIES,
INC./FXD INC/6,550,000
PAR VALUE AT 99.7865 %
6,550,000.000
0
99.78
65
----6,536,015.75 6,536,015.75 --SEI
09-Jun-
26
09-Jun-
26
09-Jun-26 912797UA
3
P 20 SOLD PAR VALUE OF U S
TREASURY BILL
6/16/26 /WELLS FARGO
SECURITIES,
LLC/6,500,000 PAR
VALUE AT 99.93031108 %
-
6,500,000.000
0
99.93
03
---6,471,060.93 -
6,471,060.93
--SEI
Post Date 09-Jun-26 Total ----40,833.21 1,261.17 -SEI
10-Jun-
26
10-Jun-26 14689FAA
3
I 310 INTEREST EARNED ON
CARVANA AUTO RECEIV
3.930% 3/10/27 $1 PV ON
1580.3300 SHARES DUE
6/10/2026 $0.00328/PV ON
482,543.12 PV DUE
6/10/26
-----1,580.33 ---SEI
10-Jun-
26
10-Jun-
26
10-Jun-26 14689FAA
3
P 20 PAID DOWN PAR VALUE
OF CARVANA AUTO
RECEIV 3.930% 3/10/27
-294,511.4500 ----294,511.45 -294,511.45 --SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 8 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
10-Jun-
26
10-Jun-
26
10-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
296,091.7800 -----296,091.78 296,091.78 --SEI
Post Date 10-Jun-26 Total ----1,580.33 --SEI
15-Jun-
26
15-Jun-26 10807VAA
3
I 310 INTEREST EARNED ON
BRIDGECRE LDG AT
4.383% 4/15/27 $1 PV ON
3212.9200 SHARES DUE
6/15/2026 $0.00342/PV ON
939,595.19 PV DUE
6/15/26
-----3,212.92 ---SEI
15-Jun-
26
15-Jun-26 3137BTUM
1
FHL3326
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L M C
MLTCL MTG 3.347%
11/25/26
------825.24 ---SEI
15-Jun-
26
15-Jun-26 3134GXHY
3
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L M C
M T N 0.750% 6/23/26
------2,830.83 ---SEI
15-Jun-
26
15-Jun-26 3133EMH
21
I 310 INTEREST EARNED ON F
F C B DEB 0.900%
6/15/26 $1 PV ON
1000000.0000 SHARES
DUE 6/15/2026
-----4,500.00 ---SEI
15-Jun-
26
15-Jun-26 46625HRS
1
I 310 INTEREST EARNED ON
JPMORGAN CHASE CO
3.200% 6/15/26 $1 PV ON
1439000.0000 SHARES
DUE 6/15/2026
-----23,024.00 ---SEI
15-Jun-
26
15-Jun-26 3133ERHG
9
FFC4426V
I 310 INTEREST EARNED ON F
F C B DEB 3.740%
9/14/26 $1 PV ON
2010000.0000 SHARES
DUE 6/14/2026
-----19,211.14 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 9 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
15-Jun-
26
15-Jun-26 3130B5JD
1
I 310 INTEREST EARNED ON F
H L B DEB 3.690%
6/15/26 $1 PV ON
8500000.0000 SHARES
DUE 6/15/2026
-----79,453.75 ---SEI
15-Jun-
26
15-Jun-26 3130B8TR
3
I 310 INTEREST EARNED ON F
H L B DEB 3.600%
6/15/26 $1 PV ON
1000000.0000 SHARES
DUE 6/15/2026
-----9,270.83 ---SEI
15-Jun-
26
10-Jun-
26
15-Jun-26 3137BTUM
1
FHL3326
P 10 PURCHASED PAR VALUE
OF F H L M C MLTCL MTG
3.347% 11/25/26
/MORGAN STANLEY &
CO. LLC/634,016.59 PAR
VALUE AT 99.54687463 %
634,016.5900 99.54
69
----631,143.70 631,143.70 --SEI
15-Jun-
26
12-Jun-
26
15-Jun-26 3134GXHY
3
P 10 PURCHASED PAR VALUE
OF F H L M C M T N
0.750% 6/23/26
/CITIGROUP GLOBAL
MARKETS INC./790,000
PAR VALUE AT 99.935 %
790,000.0000 99.93
50
----789,486.50 789,486.50 --SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 10807VAA
3
P 20 PAID DOWN PAR VALUE
OF BRIDGECRE LDG AT
4.383% 4/15/27
-306,381.3800 ----306,381.38 -306,381.38 --SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 3130B5JD
1
P 20 MATURED PAR VALUE
OF F H L B DEB
3.690% 6/15/26 8,500,000
PAR VALUE AT 100 %
-
8,500,000.000
0
100.0
000
---8,500,000.00 -
8,500,217.94
-217.94 -SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 46625HRS
1
P 20 MATURED PAR VALUE
OF JPMORGAN CHASE
CO 3.200% 6/15/26
1,439,000 PAR VALUE AT
100 %
-
1,439,000.000
0
100.0
000
---1,439,000.00 -
1,425,012.92
13,987.08 -SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 10 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
15-Jun-
26
15-Jun-
26
15-Jun-26 3130B8TR
3
P 20 MATURED PAR VALUE
OF F H L B DEB
3.600% 6/15/26 1,000,000
PAR VALUE AT 100 %
-
1,000,000.000
0
100.0
000
---1,000,000.00 -999,990.00 10.00 -SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 3133EMH
21
P 20 MATURED PAR VALUE
OF F F C B DEB
0.900% 6/15/26 1,000,000
PAR VALUE AT 100 %
-
1,000,000.000
0
100.0
000
---1,000,000.00 -996,232.00 3,768.00 -SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
10,871,043.17
00
-----
10,871,043.17
10,871,043.1
7
--SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
10,595,091.67
00
----10,595,091.67 -
10,595,091.6
7
--SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 313385YT
7
P 10 PURCHASED PAR VALUE
OF F H L B DISC NTS
6/30/26 /IRVTUS3N BK
OF NEW YORK/5,000,000
PAR VALUE AT 99.84875
%
5,000,000.000
0
99.84
88
----4,992,437.50 4,992,437.50 --SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 313313YT
9
P 10 PURCHASED PAR VALUE
OF F F C B DISC NTS
6/30/26 /BARCLAYS
CAPITAL INC. FIXED
IN/5,700,000 PAR VALUE
AT 99.84875 %
5,700,000.000
0
99.84
88
----5,691,378.75 5,691,378.75 --SEI
Post Date 15-Jun-26 Total ----152,563.71 17,547.14 -SEI
16-Jun-
26
16-Jun-26 3130AMTX
0
FHL0726
AU
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L B
DEB 2.000% 6/30/26
------17,983.33 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 11 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
16-Jun-
26
16-Jun-26 912797UA
3
I 310 INTEREST EARNED ON U
S TREASURY BILL
6/16/26 $1 PV ON
3450000.0000 SHARES
DUE 6/16/2026 3,450,000
PAR VALUE AT 100 %
-----9,639.88 ---SEI
16-Jun-
26
15-Jun-
26
16-Jun-26 3130AMTX
0
FHL0726
AU
P 10 PURCHASED PAR VALUE
OF F H L B DEB
2.000% 6/30/26
/PNCCUS31CMG PNC
U.S./1,300,000 PAR
VALUE AT 99.971 %
1,300,000.000
0
99.97
10
----1,299,623.00 1,299,623.00 --SEI
16-Jun-
26
16-Jun-
26
16-Jun-26 912797UA
3
P 20 MATURED PAR VALUE
OF U S TREASURY BILL
6/16/26 3,450,000
PAR VALUE AT 100 %
-
3,450,000.000
0
100.0
000
---3,440,360.12 -
3,440,360.12
--SEI
16-Jun-
26
16-Jun-
26
16-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
2,132,393.670
0
-----2,132,393.67 2,132,393.67 --SEI
16-Jun-
26
16-Jun-
26
16-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
2,696,242.570
0
----2,696,242.57 -
2,696,242.57
--SEI
16-Jun-
26
16-Jun-
26
16-Jun-26 912797UC
9
P 10 PURCHASED PAR VALUE
OF U S TREASURY BILL
6/30/26 /WELLS
FARGO SECURITIES,
LLC/2,700,000 PAR
VALUE AT 99.86083593 %
2,700,000.000
0
99.86
08
----2,696,242.57 2,696,242.57 --SEI
Post Date 16-Jun-26 Total -----8,343.45 --SEI
17-Jun-
26
17-Jun-26 14912EFH
5
I 310 INTEREST EARNED ON
CATERPILLAR FINL SVCS
C P 6/17/26 $1 PV ON
1050000.0000 SHARES
DUE 6/17/2026 1,050,000
PAR VALUE AT 100 %
-----960.75 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 12 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
17-Jun-
26
09-Jun-
26
17-Jun-26 05330XAA
5
P 10 PURCHASED PAR VALUE
OF AUTONATION FIN TR
0.00001% 6/15/27
/MIZUHO SECURITIES
USA INC./1,000,000 PAR
VALUE AT 100 %
1,000,000.000
0
100.0
000
----1,000,000.00 1,000,000.00 --SEI
17-Jun-
26
17-Jun-
26
17-Jun-26 14912EFH
5
P 20 MATURED PAR VALUE
OF CATERPILLAR FINL
SVCS C P 6/17/26
1,050,000 PAR VALUE AT
100 %
-
1,050,000.000
0
100.0
000
---1,049,039.25 -
1,049,039.25
--SEI
17-Jun-
26
17-Jun-
26
17-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
50,000.0000 -----50,000.00 50,000.00 --SEI
Post Date 17-Jun-26 Total ----960.75 --SEI
18-Jun-
26
18-Jun-26 912797TD
9
I 310 INTEREST EARNED ON U
S TREASURY BILL
6/18/26 $1 PV ON
2400000.0000 SHARES
DUE 6/18/2026 2,400,000
PAR VALUE AT 100 %
-----39,365.73 ---SEI
18-Jun-
26
18-Jun-26 3130AMUB
6
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L B
DEB 0.600% 6/30/26
------10,500.00 ---SEI
18-Jun-
26
18-Jun-26 3130AMSS
2
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L B
DEB 1.050% 6/30/26
------2,450.00 ---SEI
18-Jun-
26
18-Jun-26 3135G07G
2
I 310 INTEREST EARNED ON F
N M A 5.430%
6/18/26 $1 PV ON
1660000.0000 SHARES
DUE 6/18/2026
-----15,785.22 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 13 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
18-Jun-
26
18-Jun-26 03066CAA
6
I 310 INTEREST EARNED ON
AMERICREDIT AM
3.986% 3/18/27 $1 PV ON
2143.4300 SHARES DUE
6/18/2026 $0.00343/PV ON
624,471.56 PV DUE
6/18/26
-----2,143.43 ---SEI
18-Jun-
26
17-Jun-
26
18-Jun-26 3130AMSS
2
P 10 PURCHASED PAR VALUE
OF F H L B DEB
1.050% 6/30/26 /MIZUHO
SECURITIES USA
INC./500,000 PAR VALUE
AT 99.91 %
500,000.0000 99.91
00
----499,550.00 499,550.00 --SEI
18-Jun-
26
17-Jun-
26
18-Jun-26 3130AMUB
6
P 10 PURCHASED PAR VALUE
OF F H L B DEB
0.600% 6/30/26 /MIZUHO
SECURITIES USA
INC./750,000 PAR VALUE
AT 99.972 %
750,000.0000 99.97
20
----749,790.00 749,790.00 --SEI
18-Jun-
26
18-Jun-
26
18-Jun-26 912797TD
9
P 20 MATURED PAR VALUE
OF U S TREASURY BILL
6/18/26 2,400,000
PAR VALUE AT 100 %
-
2,400,000.000
0
100.0
000
---2,360,634.27 -
2,360,634.27
--SEI
18-Jun-
26
18-Jun-
26
18-Jun-26 3135G07G
2
P 20 MATURED PAR VALUE
OF F N M A
5.430% 6/18/26 1,660,000
PAR VALUE AT 100 %
-
1,660,000.000
0
100.0
000
---1,660,000.00 -
1,660,493.02
-493.02 -SEI
18-Jun-
26
18-Jun-
26
18-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
2,797,710.000
0
-----2,797,710.00 2,797,710.00 --SEI
18-Jun-
26
18-Jun-
26
18-Jun-26 03066CAA
6
P 20 PAID DOWN PAR VALUE
OF AMERICREDIT AM
3.986% 3/18/27
-202,580.6000 ----202,580.60 -202,580.60 --SEI
18-Jun-
26
18-Jun-
26
18-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
220,509.2500 -----220,509.25 220,509.25 --SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 14 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
Post Date 18-Jun-26 Total ----43,851.36 -493.02 -SEI
22-Jun-
26
22-Jun-26 92868CAA
9
I 310 INTEREST EARNED ON
VOLKSWAGEN AUTO
3.828% 3/22/27 $1 PV ON
2371.2000 SHARES DUE
6/20/2026 $0.00351/PV ON
675,747.24 PV DUE
6/20/26
-----2,371.20 ---SEI
22-Jun-
26
20-Jun-
26
22-Jun-26 92868CAA
9
P 20 PAID DOWN PAR VALUE
OF VOLKSWAGEN AUTO
3.828% 3/22/27
-178,508.2400 ----178,508.24 -178,508.24 --SEI
22-Jun-
26
22-Jun-
26
22-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
2,816,687.230
0
----2,816,687.23 -
2,816,687.23
--SEI
22-Jun-
26
22-Jun-
26
22-Jun-26 14912EFW
2
P 10 PURCHASED PAR VALUE
OF CATERPILLAR FINL
SVCS C P 6/30/26
/BARCLAYS CAPITAL INC.
FIXED IN/3,000,000 PAR
VALUE AT 99.918889 %
3,000,000.000
0
99.91
89
----2,997,566.67 2,997,566.67 --SEI
Post Date 22-Jun-26 Total ----2,371.20 --SEI
23-Jun-
26
23-Jun-26 437076CZ
3
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF HOME
DEPOT INC 5.150%
6/25/26
------53,474.17 ---SEI
23-Jun-
26
23-Jun-26 3134GXHY
3
I 310 INTEREST EARNED ON F
H L M C M T N 0.750%
6/23/26 $1 PV ON
790000.0000 SHARES
DUE 6/23/2026
-----2,962.50 ---SEI
23-Jun-
26
23-Jun-26 3133ET5M
5
FFC3626G
I 310 INTEREST EARNED ON F
F C B 3.62565%
6/23/26 $1 PV ON
1000000.0000 SHARES
DUE 6/23/2026
-----9,265.56 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 15 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
23-Jun-
26
23-Jun-26 3133EPNG
6
I 310 INTEREST EARNED ON F
F C B DEB 4.375%
6/23/26 $1 PV ON
357000.0000 SHARES
DUE 6/23/2026
-----7,809.38 ---SEI
23-Jun-
26
22-Jun-
26
23-Jun-26 437076CZ
3
P 10 PURCHASED PAR VALUE
OF HOME DEPOT INC
5.150% 6/25/26
/GOLDMAN SACHS & CO.
LLC/XOTC 2,100,000 PAR
VALUE AT 100.007 %
2,100,000.000
0
100.0
070
----2,100,147.00 2,100,147.00 --SEI
23-Jun-
26
23-Jun-
26
23-Jun-26 3134GXHY
3
P 20 MATURED PAR VALUE
OF F H L M C M T N
0.750% 6/23/26 790,000
PAR VALUE AT 100 %
-790,000.0000 100.0
000
---790,000.00 -789,486.50 513.50 -SEI
23-Jun-
26
23-Jun-
26
23-Jun-26 3133ET5M
5
FFC3626G
P 20 MATURED PAR VALUE
OF F F C B
3.62565% 6/23/26
1,000,000 PAR VALUE AT
100 %
-
1,000,000.000
0
100.0
000
---1,000,000.00 -999,987.00 13.00 -SEI
23-Jun-
26
23-Jun-
26
23-Jun-26 3133EPNG
6
P 20 MATURED PAR VALUE
OF F F C B DEB
4.375% 6/23/26 357,000
PAR VALUE AT 100 %
-357,000.0000 100.0
000
---357,000.00 -357,449.46 -449.46 -SEI
23-Jun-
26
23-Jun-
26
23-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
13,416.2700 -----13,416.27 13,416.27 --SEI
Post Date 23-Jun-26 Total -----33,359.69 77.04 -SEI
25-Jun-
26
25-Jun-26 437076CZ
3
I 310 INTEREST EARNED ON
HOME DEPOT INC
5.150% 6/25/26 $1 PV ON
2100000.0000 SHARES
DUE 6/25/2026
-----54,075.00 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 16 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-26 3130BA2U
0
I 310 INTEREST EARNED ON F
H L B DEB 4.000%
3/25/27 $1 PV ON
1000000.0000 SHARES
DUE 6/25/2026
-----10,000.00 ---SEI
25-Jun-
26
25-Jun-26 3137BTAC
5
I 310 INTEREST EARNED ON F
H L M C MLTCL MTG
3.300% 10/25/26 $1 PV ON
2748.8200 SHARES DUE
6/25/2026 $0.00275/PV ON
999,569.14 PV DUE
6/25/26
-----2,748.82 ---SEI
25-Jun-
26
25-Jun-26 3137BRQJ
7
FHL2526E
I 310 INTEREST EARNED ON F
H L M C MLTCL MTG
2.570% 7/25/26 $1 PV ON
1786.3300 SHARES DUE
6/25/2026 $0.00214/PV ON
834,087.10 PV DUE
6/25/26
-----1,786.33 ---SEI
25-Jun-
26
25-Jun-26 3137BXQY
1
FHL3227A
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
3.224% 3/25/27 $1 PV ON
2686.6700 SHARES DUE
6/25/2026 $0.00269/PV ON
1,000,000.00 PV DUE
6/25/26
-----2,686.67 ---SEI
25-Jun-
26
25-Jun-26 3137BVZ
82
FHL3450
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
3.430% 1/25/27 $1 PV ON
2818.2900 SHARES DUE
6/25/2026 $0.00286/PV ON
985,989.92 PV DUE
6/25/26
-----2,818.29 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 17 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-26 3137BSP
72
FHL2625B
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
2.653% 8/25/26 $1 PV ON
2214.9900 SHARES DUE
6/25/2026 $0.00221/PV ON
1,001,879.52 PV DUE
6/25/26
-----2,214.99 ---SEI
25-Jun-
26
25-Jun-26 3137BUX
60
FHL3426
I 310 INTEREST EARNED ON F
H L M C MLTCL MTG
3.413% 12/25/26 $1 PV ON
2798.0500 SHARES DUE
6/25/2026 $0.00284/PV ON
983,784.59 PV DUE
6/25/26
-----2,798.05 ---SEI
25-Jun-
26
25-Jun-26 3137
FNWX4
FHL2226C
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
2.282% 7/25/26 $1 PV ON
166.9300 SHARES DUE
6/25/2026 $0.00190/PV ON
87,783.45 PV DUE
6/25/26
-----166.93 ---SEI
25-Jun-
26
25-Jun-26 3137FQXJ
7
FHL2526C
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
2.525% 10/25/26 $1 PV ON
2387.7700 SHARES DUE
6/25/2026 $0.00210/PV ON
1,134,780.49 PV DUE
6/25/26
-----2,387.77 ---SEI
25-Jun-
26
25-Jun-26 912797TQ
0
I 310 INTEREST EARNED ON U
S TREASURY BILL
7/30/26 $1 PV ON
2350000.0000 SHARES
DUE 6/25/2026 2,350,000
PAR VALUE AT
99.65189574 %
-----13,845.12 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 18 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-26 912797UQ
8
I 310 INTEREST EARNED ON U
S TREASURY BILL
7/21/26 $1 PV ON
1000000.0000 SHARES
DUE 6/25/2026 1,000,000
PAR VALUE AT 99.742853
%
-----9,086.53 ---SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3130BA2U
0
P 20 FULL CALL PAR VALUE
OF F H L B DEB
4.000% 3/25/27 /CALLS/
-
1,000,000.000
0
100.0
000
---1,000,000.00 -
1,000,000.00
--SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 437076CZ
3
P 20 MATURED PAR VALUE
OF HOME DEPOT INC
5.150% 6/25/26 2,100,000
PAR VALUE AT 100 %
-
2,100,000.000
0
100.0
000
---2,100,000.00 -
2,100,147.00
-147.00 -SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
3,154,075.000
0
-----3,154,075.00 3,154,075.00 --SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3137BTAC
5
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MTG
3.300% 10/25/26
-1,997.9300 ----1,997.93 -1,988.17 9.76 -SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3137BRQJ
7
FHL2526E
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MTG
2.570% 7/25/26
-552,641.0200 ----552,641.02 -549,642.76 2,998.26 -SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3137BVZ
82
FHL3450
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MT
3.430% 1/25/27
-2,265.6300 ----2,265.63 -2,253.59 12.04 -SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3137BSP
72
FHL2625B
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MT
2.653% 8/25/26
-104,165.8500 ----104,165.85 -103,632.81 533.04 -SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 19 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-
26
25-Jun-26 3137BUX
60
FHL3426
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MTG
3.413% 12/25/26
-2,141.6700 ----2,141.67 -2,132.38 9.29 -SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3137
FNWX4
FHL2226C
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MT
2.282% 7/25/26
-87,624.7800 ----87,624.78 -87,248.26 376.52 -SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3137FQXJ
7
FHL2526C
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MT
2.525% 10/25/26
-189,103.0300 ----189,103.03 -187,290.69 1,812.34 -SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
2,189,890.970
0
----2,189,890.97 -
2,189,890.97
--SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 14912EFW
2
P 10 PURCHASED PAR VALUE
OF CATERPILLAR FINL
SVCS C P 6/30/26 /BOFA
SECURITIES, INC./FXD
INC/6,500,000 PAR VALUE
AT 99.94902785 %
6,500,000.000
0
99.94
90
----6,496,686.81 6,496,686.81 --SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 912797TQ
0
P 20 SOLD PAR VALUE OF U S
TREASURY BILL
7/30/26 /BARCLAYS
CAPITAL INC. FIXED
IN/2,350,000 PAR VALUE
AT 99.65189574 %
-
2,350,000.000
0
99.65
19
---2,327,974.43 -
2,327,974.43
--SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 912797UQ
8
P 20 SOLD PAR VALUE OF U S
TREASURY BILL
7/21/26 /IRVTUS3N BK OF
NEW YORK/1,000,000
PAR VALUE AT 99.742853
%
-
1,000,000.000
0
99.74
29
---988,342.00 -988,342.00 --SEI
Post Date 25-Jun-26 Total ----110,218.75 5,604.25 -SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 20 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
29-Jun-
26
29-Jun-26 91282CLP
4
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF U S
TREASURY NT 3.500%
9/30/26
------12,909.84 ---SEI
29-Jun-
26
29-Jun-26 912797VD
6
I 310 INTEREST EARNED ON U
S TREASURY BILL
9/22/26 $1 PV ON
1300000.0000 SHARES
DUE 6/26/2026 1,300,000
PAR VALUE AT
99.14338923 %
-----4,428.60 ---SEI
29-Jun-
26
26-Jun-
26
29-Jun-26 91282CLP
4
P 10 PURCHASED PAR VALUE
OF U S TREASURY NT
3.500% 9/30/26
/IRVTUS3N BK OF NEW
YORK/1,500,000 PAR
VALUE AT 99.918304 %
1,500,000.000
0
99.91
83
----1,498,774.56 1,498,774.56 --SEI
29-Jun-
26
26-Jun-
26
29-Jun-26 912797VD
6
P 20 SOLD PAR VALUE OF U S
TREASURY BILL
9/22/26 /BMO-CHICAGO
BRANCH/1,300,000 PAR
VALUE AT 99.14338923 %
-
1,300,000.000
0
99.14
34
---1,284,435.46 -
1,284,435.46
--SEI
29-Jun-
26
29-Jun-
26
29-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-222,820.3400 ----222,820.34 -222,820.34 --SEI
Post Date 29-Jun-26 Total -----8,481.24 --SEI
30-Jun-
26
30-Jun-26 912797UR
6
I 310 INTEREST EARNED ON U
S TREASURY BILL
7/28/26 $1 PV ON
2000000.0000 SHARES
DUE 6/26/2026 2,000,000
PAR VALUE AT
99.7194555 %
-----18,268.44 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 21 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
30-Jun-
26
30-Jun-26 912797VD
6
I 310 INTEREST EARNED ON U
S TREASURY BILL
9/22/26 $1 PV ON
700000.0000 SHARES
DUE 6/26/2026 700,000
PAR VALUE AT 99.15265
%
-----2,449.45 ---SEI
30-Jun-
26
30-Jun-26 313313YT
9
I 310 INTEREST EARNED ON F
F C B DISC NTS
6/30/26 $1 PV ON
5700000.0000 SHARES
DUE 6/30/2026 5,700,000
PAR VALUE AT 100 %
-----8,621.25 ---SEI
30-Jun-
26
30-Jun-26 912797UC
9
I 310 INTEREST EARNED ON U
S TREASURY BILL
6/30/26 $1 PV ON
23500000.0000 SHARES
DUE 6/30/2026 23,500,000
PAR VALUE AT 100 %
-----137,106.05 ---SEI
30-Jun-
26
30-Jun-26 14912EFW
2
I 310 INTEREST EARNED ON
CATERPILLAR FINL SVCS
C P 6/30/26 $1 PV ON
3000000.0000 SHARES
DUE 6/30/2026 3,000,000
PAR VALUE AT 100 %
-----2,433.33 ---SEI
30-Jun-
26
30-Jun-26 16677KFW
8
I 310 INTEREST EARNED ON
CHEVRON CORP DISC
COML C P 6/30/26 $1 PV
ON 6550000.0000
SHARES DUE 6/30/2026
6,550,000 PAR VALUE AT
100 %
-----13,984.25 ---SEI
30-Jun-
26
30-Jun-26 14912EFW
2
I 310 INTEREST EARNED ON
CATERPILLAR FINL SVCS
C P 6/30/26 $1 PV ON
6500000.0000 SHARES
DUE 6/30/2026 6,500,000
PAR VALUE AT 100 %
-----3,313.19 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 22 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
30-Jun-
26
30-Jun-26 313385YT
7
I 310 INTEREST EARNED ON F
H L B DISC NTS
6/30/26 $1 PV ON
5000000.0000 SHARES
DUE 6/30/2026 5,000,000
PAR VALUE AT 100 %
-----7,562.50 ---SEI
30-Jun-
26
30-Jun-26 3130AMSS
2
I 310 INTEREST EARNED ON F
H L B DEB 1.050%
6/30/26 $1 PV ON
830000.0000 SHARES
DUE 6/30/2026
-----4,357.50 ---SEI
30-Jun-
26
30-Jun-26 3130AMSL
7
I 310 INTEREST EARNED ON F
H L B DEB 1.030%
6/30/26 $1 PV ON
425000.0000 SHARES
DUE 6/30/2026
-----2,188.75 ---SEI
30-Jun-
26
30-Jun-26 3130AMYA
4
I 310 INTEREST EARNED ON F
H L B DEB 1.070%
6/30/26 $1 PV ON
2400000.0000 SHARES
DUE 6/30/2026
-----12,840.00 ---SEI
30-Jun-
26
30-Jun-26 3130AMYJ
5
I 310 INTEREST EARNED ON F
H L B DEB 1.000%
6/30/26 $1 PV ON
1300000.0000 SHARES
DUE 6/30/2026
-----6,500.00 ---SEI
30-Jun-
26
30-Jun-26 3130AMTX
0
FHL0726
AU
I 310 INTEREST EARNED ON F
H L B DEB 2.000%
6/30/26 $1 PV ON
1300000.0000 SHARES
DUE 6/30/2026
-----19,500.00 ---SEI
30-Jun-
26
30-Jun-26 P 210 CASH DISBURSEMENT
PAID TO ORANGE
COUNTY SANITATION
DISTRICT OUTGOING
DOMESTIC WIRE
TRANSFER FROM LIQUID
OPERATING PORTFOLIO
------
60,000,000.00
---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 23 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
30-Jun-
26
30-Jun-26 3130AMUB
6
I 310 INTEREST EARNED ON F
H L B DEB 0.600%
6/30/26 $1 PV ON
750000.0000 SHARES
DUE 6/30/2026
-----11,250.00 ---SEI
30-Jun-
26
26-Jun-
26
30-Jun-26 912797UR
6
P 20 SOLD PAR VALUE OF U S
TREASURY BILL
7/28/26 /J.P. MORGAN
SECURITIES
LLC/2,000,000 PAR
VALUE AT 99.7194555 %
-
2,000,000.000
0
99.71
95
---1,976,120.67 -
1,976,120.67
--SEI
30-Jun-
26
26-Jun-
26
30-Jun-26 912797VD
6
P 20 SOLD PAR VALUE OF U S
TREASURY BILL
9/22/26 /J.P. MORGAN
SECURITIES LLC/700,000
PAR VALUE AT 99.15265
%
-700,000.0000 99.15
27
---691,619.10 -691,619.10 --SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 313385YT
7
P 20 MATURED PAR VALUE
OF F H L B DISC NTS
6/30/26 5,000,000 PAR
VALUE AT 100 %
-
5,000,000.000
0
100.0
000
---4,992,437.50 -
4,992,437.50
--SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 3130AMYJ
5
P 20 MATURED PAR VALUE
OF F H L B DEB
1.000% 6/30/26 1,300,000
PAR VALUE AT 100 %
-
1,300,000.000
0
100.0
000
---1,300,000.00 -
1,294,111.00
5,889.00 -SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 14912EFW
2
P 20 MATURED PAR VALUE
OF CATERPILLAR FINL
SVCS C P 6/30/26
6,500,000 PAR VALUE AT
100 %
-
6,500,000.000
0
100.0
000
---6,496,686.81 -
6,496,686.81
--SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 14912EFW
2
P 20 MATURED PAR VALUE
OF CATERPILLAR FINL
SVCS C P 6/30/26
3,000,000 PAR VALUE AT
100 %
-
3,000,000.000
0
100.0
000
---2,997,566.67 -
2,997,566.67
--SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 24 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
30-Jun-
26
30-Jun-
26
30-Jun-26 3130AMSS
2
P 20 MATURED PAR VALUE
OF F H L B DEB
1.050% 6/30/26 500,000
PAR VALUE AT 100 %
-500,000.0000 100.0
000
---500,000.00 -499,550.00 450.00 -SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 3130AMYA
4
P 20 MATURED PAR VALUE
OF F H L B DEB
1.070% 6/30/26 2,400,000
PAR VALUE AT 100 %
-
2,400,000.000
0
100.0
000
---2,400,000.00 -
2,391,978.48
8,021.52 -SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 3130AMTX
0
FHL0726
AU
P 20 MATURED PAR VALUE
OF F H L B DEB
2.000% 6/30/26 1,300,000
PAR VALUE AT 100 %
-
1,300,000.000
0
100.0
000
---1,300,000.00 -
1,299,623.00
377.00 -SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 3130AMSL
7
P 20 MATURED PAR VALUE
OF F H L B DEB
1.030% 6/30/26 425,000
PAR VALUE AT 100 %
-425,000.0000 100.0
000
---425,000.00 -422,921.75 2,078.25 -SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 313313YT
9
P 20 MATURED PAR VALUE
OF F F C B DISC NTS
6/30/26 5,700,000 PAR
VALUE AT 100 %
-
5,700,000.000
0
100.0
000
---5,691,378.75 -
5,691,378.75
--SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 3130AMSS
2
P 20 MATURED PAR VALUE
OF F H L B DEB
1.050% 6/30/26 330,000
PAR VALUE AT 100 %
-330,000.0000 100.0
000
---330,000.00 -328,361.22 1,638.78 -SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 3130AMUB
6
P 20 MATURED PAR VALUE
OF F H L B DEB
0.600% 6/30/26 750,000
PAR VALUE AT 100 %
-750,000.0000 100.0
000
---750,000.00 -749,790.00 210.00 -SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 25 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LIQUID OPERATING PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
30-Jun-
26
30-Jun-
26
30-Jun-26 16677KFW
8
P 20 MATURED PAR VALUE
OF CHEVRON CORP
DISC COML C P 6/30/26
6,550,000 PAR VALUE AT
100 %
-
6,550,000.000
0
100.0
000
---6,536,015.75 -
6,536,015.75
--SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 912797UC
9
P 20 MATURED PAR VALUE
OF U S TREASURY BILL
6/30/26 23,500,000
PAR VALUE AT 100 %
-
23,500,000.00
00
100.0
000
---23,362,893.95 -
23,362,893.9
5
--SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
59,984,593.91
00
-----
59,984,593.91
59,984,593.9
1
--SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
59,984,500.00
00
----59,984,500.00 -
59,984,500.0
0
--SEI
Post Date 30-Jun-26 Total -----
59,730,960.7
4
18,664.55 -SEI
Account 6745046600 Total -----
99,212,214.9
2
49,744.70 -SEI
Account Ending Cash Principal Cash: -
27,607,612.34
Income Cash:
27,607,612.34
Total Cash: -
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 26 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
Account Beginning Cash Principal Cash: -
120,811,052.80
Income Cash:
120,811,052.80
Total Cash: -
01-Jun-
26
01-Jun-26 91282CKF
7
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF U S
TREASURY NT 4.125%
3/31/31
------58,871.42 ---SEI
01-Jun-
26
01-Jun-26 91282CFJ
5
I 301 RECEIVED ACCRUED
INTEREST ON SALE OF U
S TREASURY NT
3.125% 8/31/29
-----33,564.03 ---SEI
01-Jun-
26
01-Jun-26 91282CJM
4
I 310 INTEREST EARNED ON
UNITED STATES TREAS
4.375% 11/30/30 $1 PV ON
6285000.0000 SHARES
DUE 5/31/2026
-----137,484.38 ---SEI
01-Jun-
26
01-Jun-26 3133EMHZ
8
I 310 INTEREST EARNED ON F
F C B DEB 1.125%
6/01/29 $1 PV ON
2500000.0000 SHARES
DUE 6/1/2026
-----14,062.50 ---SEI
01-Jun-
26
01-Jun-26 31846V567
FGZXX
I 310 INTEREST EARNED ON
FIRST AM GOVT OB FD
CL Z UNIT ON 0.0000
SHARES DUE 5/31/2026
INTEREST FROM 5/1/26
TO 5/31/26
-----5,214.30 ---SEI
01-Jun-
26
29-May-
26
01-Jun-26 91282CKF
7
P 10 PURCHASED PAR VALUE
OF U S TREASURY NT
4.125% 3/31/31
/GOLDMAN SACHS & CO.
LLC/8,425,000 PAR
VALUE AT 99.92578125 %
8,425,000.000
0
99.92
58
----8,418,747.07 8,418,747.07 --SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 27 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
01-Jun-
26
29-May-
26
01-Jun-26 91282CFJ
5
P 20 SOLD PAR VALUE OF U S
TREASURY NT 3.125%
8/31/29 /MORGAN
STANLEY & CO.
LLC/4,250,000 PAR
VALUE AT 97.14810259 %
-
4,250,000.000
0
97.14
81
---4,128,794.36 -
4,097,597.66
-31,196.7
0
SEI
01-Jun-
26
01-Jun-
26
01-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
4,163,713.220
0
----4,163,713.22 -
4,163,713.22
--SEI
Post Date 01-Jun-26 Total ---5,214.30 157,436.19 -31,196.7
0
SEI
02-Jun-
26
02-Jun-
26
02-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
5,214.3000 -----5,214.30 5,214.30 --SEI
Post Date 02-Jun-26 Total ----5,214.30 5,214.30 --SEI
09-Jun-
26
09-Jun-26 912828Z94 I 301 RECEIVED ACCRUED
INTEREST ON SALE OF U
S TREASURY NT
1.500% 2/15/30
-----33,066.30 ---SEI
09-Jun-
26
02-Jun-
26
09-Jun-26 637639AT
2
P 10 PURCHASED PAR VALUE
OF NATIONAL SECS
4.700% 6/09/31 /CANTOR
FITZGERALD &
CO./2,889,000 PAR
VALUE AT 100.093 %
2,889,000.000
0
100.0
930
----2,891,686.77 2,891,686.77 --SEI
09-Jun-
26
02-Jun-
26
09-Jun-26 637639AT
2
P 10 PURCHASED PAR VALUE
OF NATIONAL SECS
4.700% 6/09/31 /BOFA
SECURITIES, INC./FXD
INC/3,611,000 PAR VALUE
AT 99.969 %
3,611,000.000
0
99.96
90
----3,609,880.59 3,609,880.59 --SEI
09-Jun-
26
08-Jun-
26
09-Jun-26 912828Z94 P 20 SOLD PAR VALUE OF U S
TREASURY NT 1.500%
2/15/30 /IRVTUS3N BK OF
NEW YORK/7,000,000
PAR VALUE AT 90.82779
%
-
7,000,000.000
0
90.82
78
---6,357,945.30 -
6,281,452.01
-76,493.2
9
SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 28 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
09-Jun-
26
09-Jun-
26
09-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-110,555.7600 ----110,555.76 -110,555.76 --SEI
Post Date 09-Jun-26 Total ----109,559.59 -76,493.2
9
SEI
11-Jun-
26
11-Jun-26 06051GJB
6
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF BANK
AMER CORP MTN
2.592% 4/29/31
------5,292.00 ---SEI
11-Jun-
26
11-Jun-26 91282CKC
4
I 301 RECEIVED ACCRUED
INTEREST ON SALE OF U
S TREASURY NT
4.250% 2/28/31
-----83,267.66 ---SEI
11-Jun-
26
11-Jun-26 91282CMD
0
I 301 RECEIVED ACCRUED
INTEREST ON SALE OF U
S TREASURY NT
4.375% 12/31/29
-----137,051.10 ---SEI
11-Jun-
26
11-Jun-26 06051GGF
0
I 301 RECEIVED ACCRUED
INTEREST ON SALE OF
BANK OF AMERICA MTN
3.824% 1/20/28
-----93,982.77 ---SEI
11-Jun-
26
10-Jun-
26
11-Jun-26 06051GJB
6
P 10 PURCHASED PAR VALUE
OF BANK AMER CORP
MTN 2.592% 4/29/31
/BNP PARIBAS
SECURITIES
BOND/1,750,000 PAR
VALUE AT 92.098 %
1,750,000.000
0
92.09
80
----1,611,715.00 1,611,715.00 --SEI
11-Jun-
26
10-Jun-
26
11-Jun-26 91282CKC
4
P 20 SOLD PAR VALUE OF U S
TREASURY NT 4.250%
2/28/31 /J.P. MORGAN
SECURITIES
LLC/7,000,000 PAR
VALUE AT 99.89029 %
-
7,000,000.000
0
99.89
03
---6,992,320.30 -
7,108,554.69
-
116,234.3
9
-SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 29 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
11-Jun-
26
10-Jun-
26
11-Jun-26 91282CMD
0
P 20 SOLD PAR VALUE OF U S
TREASURY NT 4.375%
12/31/29 /J.P. MORGAN
SECURITIES
LLC/7,000,000 PAR
VALUE AT 100.48013371
%
-
7,000,000.000
0
100.4
801
---7,033,609.36 -
7,155,312.50
-
121,703.1
4
-SEI
11-Jun-
26
10-Jun-
26
11-Jun-26 06051GGF
0
P 20 SOLD PAR VALUE OF
BANK OF AMERICA MTN
3.824% 1/20/28 /BOFA
SECURITIES, INC./FXD
INC/6,275,000 PAR VALUE
AT 99.635 %
-
6,275,000.000
0
99.63
50
---6,252,096.25 -
5,907,613.65
-344,482.
60
SEI
11-Jun-
26
11-Jun-
26
11-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
18,975,320.44
00
-----
18,975,320.44
18,975,320.4
4
--SEI
Post Date 11-Jun-26 Total ----415,554.60 -
237,937.5
3
344,482.
60
SEI
12-Jun-
26
12-Jun-26 3134HCY
37
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L M C
DEB 4.500% 5/22/31
------12,500.00 ---SEI
12-Jun-
26
12-Jun-26 693475BR
5
I 310 INTEREST EARNED ON
PNC FINL SVCS GROUP
5.582% 6/12/29 $1 PV ON
8000000.0000 SHARES
DUE 6/12/2026
-----223,280.00 ---SEI
12-Jun-
26
10-Jun-
26
12-Jun-26 3134HCY
37
P 10 PURCHASED PAR VALUE
OF F H L M C DEB
4.500% 5/22/31 /BOFA
SECURITIES, INC./FXD
INC/5,000,000 PAR VALUE
AT 100 %
5,000,000.000
0
100.0
000
----5,000,000.00 5,000,000.00 --SEI
12-Jun-
26
12-Jun-
26
12-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
4,789,220.000
0
----4,789,220.00 -
4,789,220.00
--SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 30 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
Post Date 12-Jun-26 Total ----210,780.00 --SEI
15-Jun-
26
15-Jun-26 44935CAD
3
I 310 INTEREST EARNED ON
HYUNDAI AUTO RECV TR
4.790% 10/15/29 $1 PV ON
15231.6000 SHARES DUE
6/15/2026 $0.00360/PV ON
4,231,000.00 PV DUE
6/15/26
-----15,231.60 ---SEI
15-Jun-
26
15-Jun-26 47787DAD
3
I 310 INTEREST EARNED ON
JOHN DEERE OWNER
3.870% 8/15/30 $1 PV ON
3563.6300 SHARES DUE
6/15/2026 $0.00323/PV ON
1,105,000.00 PV DUE
6/15/26
-----3,563.63 ---SEI
15-Jun-
26
15-Jun-26 43816DAC
9
I 310 INTEREST EARNED ON
HONDA AUTO
4.330% 3/15/29 $1 PV ON
6499.9500 SHARES DUE
6/15/2026 $0.00361/PV ON
1,801,371.47 PV DUE
6/15/26
-----6,499.95 ---SEI
15-Jun-
26
15-Jun-26 02582JKM
1
AE44529
I 310 INTEREST EARNED ON
AMERICAN EXP
4.560% 12/17/29 $1 PV ON
40416.8000 SHARES DUE
6/15/2026 $0.00380/PV ON
10,636,000.00 PV DUE
6/15/26
-----40,416.80 ---SEI
15-Jun-
26
15-Jun-26 14043KAK
1
I 310 INTEREST EARNED ON
CAPITAL ONE PRIME
4.760% 8/15/28 $1 PV ON
20785.3400 SHARES DUE
6/15/2026 $0.00397/PV ON
5,240,000.00 PV DUE
6/15/26
-----20,785.34 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 31 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
15-Jun-
26
15-Jun-26 361886DK
7
I 310 INTEREST EARNED ON
GMF FLOORPL OWNE
4.680% 11/15/28 $1 PV ON
30069.0000 SHARES DUE
6/15/2026 $0.00390/PV ON
7,710,000.00 PV DUE
6/15/26
-----30,069.00 ---SEI
15-Jun-
26
15-Jun-26 448984AD
6
I 310 INTEREST EARNED ON
HYUNDAI AUTO LEASE
4.620% 4/17/28 $1 PV ON
19250.0000 SHARES DUE
6/15/2026 $0.00385/PV ON
5,000,000.00 PV DUE
6/15/26
-----19,250.00 ---SEI
15-Jun-
26
15-Jun-26 58773DAD
6
I 310 INTEREST EARNED ON
MERCEDES BENZ
4.780% 12/17/29 $1 PV ON
18960.6700 SHARES DUE
6/15/2026 $0.00398/PV ON
4,760,000.00 PV DUE
6/15/26
-----18,960.67 ---SEI
15-Jun-
26
15-Jun-26 50118HAC
0
KCO2530
I 310 INTEREST EARNED ON
KUBOTA CR OWNER TR
3.870% 5/15/30 $1 PV ON
4992.3000 SHARES DUE
6/15/2026 $0.00323/PV ON
1,548,000.00 PV DUE
6/15/26
-----4,992.30 ---SEI
15-Jun-
26
15-Jun-26 05522RDL
9
I 310 INTEREST EARNED ON
BANK OF AMERICA
4.220% 4/15/31 $1 PV ON
17780.6200 SHARES DUE
6/15/2026 $0.00363/PV ON
4,893,000.00 PV DUE
6/15/26
-----17,780.62 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 32 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
15-Jun-
26
15-Jun-26 47800BAC
2
JDO5027
I 310 INTEREST EARNED ON
JOHN DEERE OWNER
5.090% 6/15/27 $1 PV ON
480.8300 SHARES DUE
6/15/2026 $0.00424/PV ON
113,359.49 PV DUE
6/15/26
-----480.83 ---SEI
15-Jun-
26
15-Jun-26 345282AD
9
I 310 INTEREST EARNED ON
FORD CREDIT AT
4.940% 6/15/28 $1 PV ON
18887.8700 SHARES DUE
6/15/2026 $0.00393/PV ON
4,802,000.00 PV DUE
6/15/26
-----18,887.87 ---SEI
15-Jun-
26
15-Jun-26 161571HV
9
I 310 INTEREST EARNED ON
CHASE ISSUE TR
4.600% 1/16/29 $1 PV ON
30820.0000 SHARES DUE
6/15/2026 $0.00383/PV ON
8,040,000.00 PV DUE
6/15/26
-----30,820.00 ---SEI
15-Jun-
26
15-Jun-26 3133TCE
95
FHL3032
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
4.532% 8/15/32 $1 PV ON
3.8000 SHARES DUE
6/15/2026 $0.00378/PV ON
977.30 PV DUE
6/15/26
-----3.80 ---SEI
15-Jun-
26
15-Jun-26 47800DAD
6
I 310 INTEREST EARNED ON
JOHN DEERE OWNER TR
4.830% 9/17/29 $1 PV ON
10737.1500 SHARES DUE
6/15/2026 $0.00353/PV ON
3,046,000.00 PV DUE
6/15/26
-----10,737.15 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 33 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
15-Jun-
26
15-Jun-26 706916AC
7
I 310 INTEREST EARNED ON
PENFED AUTO REC
4.650% 7/15/30 $1 PV ON
7401.7700 SHARES DUE
6/15/2026 $0.00336/PV ON
2,204,000.00 PV DUE
6/15/26
-----7,401.77 ---SEI
15-Jun-
26
15-Jun-26 92887TAC
5
I 310 INTEREST EARNED ON
VOLVO FINANCIAL
4.460% 5/15/29 $1 PV ON
7619.1600 SHARES DUE
6/15/2026 $0.00372/PV ON
2,050,000.00 PV DUE
6/15/26
-----7,619.16 ---SEI
15-Jun-
26
15-Jun-26 31348SWZ
3
786064F
I 310 INTEREST EARNED ON F
H L M C #786064 5.762%
1/01/28 $1 PV ON 0.7300
SHARES DUE 6/15/2026
APRIL FHLMC DUE
6/15/26
-----0.73 ---SEI
15-Jun-
26
15-Jun-26 3137HQ4U
2
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L M C
MLTCL 4.050% 1/25/31
------11,817.23 ---SEI
15-Jun-
26
15-Jun-26 3137HA4L
7
FHL4631A
I 300 PAID ACCRUED
INTEREST ON
PURCHASE OF F H L M C
MLTCL MT 4.660%
1/25/31
------13,555.42 ---SEI
15-Jun-
26
15-Jun-26 756109BS
2
I 310 INTEREST EARNED ON
REALTY INCOME CORP
4.700% 12/15/28 $1 PV ON
5500000.0000 SHARES
DUE 6/15/2026
-----129,250.00 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 34 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
15-Jun-
26
15-Jun-26 12674BAB
1
CE44328
I 310 INTEREST EARNED ON
CNH EQUIPMENT
4.300% 8/15/28 $1 PV ON
5177.2200 SHARES DUE
6/15/2026 $0.00358/PV ON
1,444,804.35 PV DUE
6/15/26
-----5,177.22 ---SEI
15-Jun-
26
15-Jun-26 3137HPM
75
I 310 INTEREST EARNED ON F
H L M C MLTCL MTG
4.250% 1/15/31 $1 PV ON
21845.2000 SHARES DUE
6/15/2026 $0.00354/PV ON
6,168,055.63 PV DUE
6/15/26
-----21,845.20 ---SEI
15-Jun-
26
15-Jun-26 06406RBG
1
I 310 INTEREST EARNED ON
BANK NEW YORK MTN
3.992% 6/13/28 $1 PV ON
2500000.0000 SHARES
DUE 6/13/2026
-----49,900.00 ---SEI
15-Jun-
26
15-Jun-26 91282CMD
0
I 301 RECEIVED ACCRUED
INTEREST ON SALE OF U
S TREASURY NT
4.375% 12/31/29
-----10,031.08 ---SEI
15-Jun-
26
10-Jun-
26
15-Jun-26 3137HQ4U
2
P 10 PURCHASED PAR VALUE
OF F H L M C MLTCL
4.050% 1/25/31
/SANTANDER US
CAPITAL MKTS
LLC/7,503,000 PAR
VALUE AT 98.015625 %
7,503,000.000
0
98.01
56
----7,354,112.34 7,354,112.34 --SEI
15-Jun-
26
10-Jun-
26
15-Jun-26 3137HA4L
7
FHL4631A
P 10 PURCHASED PAR VALUE
OF F H L M C MLTCL MT
4.660% 1/25/31
/BARCLAYS CAPITAL INC.
FIXED IN/7,480,000 PAR
VALUE AT 100.26171872
%
7,480,000.000
0
100.2
617
----7,499,576.56 7,499,576.56 --SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 35 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
15-Jun-
26
15-Jun-
26
15-Jun-26 3133TCE
95
FHL3032
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MT
4.532% 8/15/32
-58.3000 ----58.30 -58.36 --0.06 SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 43816DAC
9
P 20 PAID DOWN PAR VALUE
OF HONDA AUTO
4.330% 3/15/29
-123,330.0200 ----123,330.02 -123,312.57 -17.45 SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 31348SWZ
3
786064F
P 20 PAID DOWN PAR VALUE
OF F H L M C #786064
5.762% 1/01/28 MAY
FHLMC DUE 6/15/26
-7.3800 ----7.38 -7.20 -0.18 SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 31846V567
FGZXX
P 20 SOLD UNITS OF FIRST
AM GOVT OB FD CL Z
-
14,295,440.17
00
----14,295,440.17 -
14,295,440.1
7
--SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 3137HPM
75
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MTG
4.250% 1/15/31
-100,591.2700 ----100,591.27 -100,842.75 -251.48 -SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 12674BAB
1
CE44328
P 20 PAID DOWN PAR VALUE
OF CNH EQUIPMENT
4.300% 8/15/28
-80,296.6300 ----80,296.63 -80,294.81 -1.82 SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 47800BAC
2
JDO5027
P 20 PAID DOWN PAR VALUE
OF JOHN DEERE OWNER
5.090% 6/15/27 CMO
FINAL PAYDOWN
-113,359.4900 ----113,359.49 -113,350.69 -8.80 SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
807,943.5100 -----807,943.51 807,943.51 --SEI
15-Jun-
26
15-Jun-
26
15-Jun-26 91282CMD
0
P 20 SOLD PAR VALUE OF U S
TREASURY NT 4.375%
12/31/29 /J.P. MORGAN
SECURITIES LLC/500,000
PAR VALUE AT
100.843416 %
-500,000.0000 100.8
434
---504,217.08 -511,093.75 -6,876.67 -SEI
Post Date 15-Jun-26 Total ----437,232.11 -7,128.15 28.19 SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 36 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
18-Jun-
26
18-Jun-26 3134HAW
33
I 310 INTEREST EARNED ON F
H L M C M T N 4.750%
12/18/29 $1 PV ON
10000000.0000 SHARES
DUE 6/18/2026
-----237,500.00 ---SEI
18-Jun-
26
18-Jun-
26
18-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
237,500.0000 -----237,500.00 237,500.00 --SEI
Post Date 18-Jun-26 Total ----237,500.00 --SEI
22-Jun-
26
22-Jun-26 92348KDY
6
I 310 INTEREST EARNED ON
VERIZON MASTER
TRUST 4.510% 3/20/30 $1
PV ON 29055.6700
SHARES DUE 6/20/2026
$0.00376/PV ON
7,731,000.00 PV DUE
6/20/26
-----29,055.67 ---SEI
22-Jun-
26
22-Jun-26 87269AAA
8
I 310 INTEREST EARNED ON T
MOBILE US 4.250%
10/21/30 $1 PV ON
23948.7500 SHARES DUE
6/20/2026 $0.00354/PV ON
6,762,000.00 PV DUE
6/20/26
-----23,948.75 ---SEI
22-Jun-
26
22-Jun-26 36273VAD
7
I 310 INTEREST EARNED ON
GM FINL AM LS TR
3.880% 1/22/29 $1 PV ON
4468.4700 SHARES DUE
6/20/2026 $0.00323/PV ON
1,382,000.00 PV DUE
6/20/26
-----4,468.47 ---SEI
22-Jun-
26
22-Jun-26 36225CC
20
080088M
I 310 INTEREST EARNED ON G
N M A I I #080088 5.625%
6/20/27 $1 PV ON 4.2100
SHARES DUE 6/20/2026
MAY GNMA DUE
6/20/26
-----4.21 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 37 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
22-Jun-
26
22-Jun-26 36225CAZ
9
080023M
I 310 INTEREST EARNED ON G
N M A I I #080023 5.125%
12/20/26 $1 PV ON 1.7300
SHARES DUE 6/20/2026
MAY GNMA DUE
6/20/26
-----1.73 ---SEI
22-Jun-
26
22-Jun-26 36225CNM
4
080395M
I 310 INTEREST EARNED ON G
N M A I I #080395 5.625%
4/20/30 $1 PV ON 5.6100
SHARES DUE 6/20/2026
MAY GNMA DUE
6/20/26
-----5.61 ---SEI
22-Jun-
26
22-Jun-26 36225CN
28
080408M
I 310 INTEREST EARNED ON G
N M A I I #080408 5.625%
5/20/30 $1 PV ON 50.0900
SHARES DUE 6/20/2026
MAY GNMA DUE
6/20/26
-----50.09 ---SEI
22-Jun-
26
22-Jun-26 36225DCB
8
080965M
I 310 INTEREST EARNED ON G
N M A I I #080965 5.375%
7/20/34 $1 PV ON 49.1300
SHARES DUE 6/20/2026
MAY GNMA DUE
6/20/26
-----49.13 ---SEI
22-Jun-
26
22-Jun-26 89239NAD
7
TLO4728
I 310 INTEREST EARNED ON
TOYOTA LEASE OWNER
4.750% 2/22/28 $1 PV ON
4378000.0000 SHARES
DUE 6/20/2026
-----17,329.58 ---SEI
22-Jun-
26
20-Jun-
26
22-Jun-26 36225CN
28
080408M
P 20 PAID DOWN PAR VALUE
OF G N M A I I #080408
5.625% 5/20/30 MAY
GNMA DUE 6/20/26
-214.2200 ----214.22 -212.04 -2.18 SEI
22-Jun-
26
20-Jun-
26
22-Jun-26 36225CNM
4
080395M
P 20 PAID DOWN PAR VALUE
OF G N M A I I #080395
5.625% 4/20/30 MAY
GNMA DUE 6/20/26
-26.3300 ----26.33 -26.09 -0.24 SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 38 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
22-Jun-
26
20-Jun-
26
22-Jun-26 36225CAZ
9
080023M
P 20 PAID DOWN PAR VALUE
OF G N M A I I #080023
5.125% 12/20/26 MAY
GNMA DUE 6/20/26
-73.2500 ----73.25 -74.46 --1.21 SEI
22-Jun-
26
20-Jun-
26
22-Jun-26 36225DCB
8
080965M
P 20 PAID DOWN PAR VALUE
OF G N M A I I #080965
5.375% 7/20/34 MAY
GNMA DUE 6/20/26
-151.9200 ----151.92 -151.82 -0.10 SEI
22-Jun-
26
20-Jun-
26
22-Jun-26 36225CC
20
080088M
P 20 PAID DOWN PAR VALUE
OF G N M A I I #080088
5.625% 6/20/27 MAY
GNMA DUE 6/20/26
-79.2500 ----79.25 -80.98 --1.73 SEI
22-Jun-
26
22-Jun-
26
22-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
58,128.6300 -----58,128.63 58,128.63 --SEI
22-Jun-
26
22-Jun-
26
22-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
17,329.5800 -----17,329.58 17,329.58 --SEI
Post Date 22-Jun-26 Total ----74,912.82 --0.42 SEI
25-Jun-
26
25-Jun-26 3136AJZP
4
I 310 INTEREST EARNED ON F
N M A GTD REMIC
1.500% 4/25/29 $1 PV ON
549.7200 SHARES DUE
6/25/2026 $0.00125/PV ON
439,775.04 PV DUE
6/25/26
-----549.72 ---SEI
25-Jun-
26
25-Jun-26 05592XAD
2
BVO5428
I 310 INTEREST EARNED ON
BMW VEH OWNER TR
5.470% 2/25/28 $1 PV ON
1342.1600 SHARES DUE
6/25/2026 $0.00456/PV ON
294,440.94 PV DUE
6/25/26
-----1,342.16 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 39 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-26 3137FETN
0
FHL0428B
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
3.350% 1/25/28 $1 PV ON
23561.6600 SHARES DUE
6/25/2026 $0.00279/PV ON
8,440,000.00 PV DUE
6/25/26
-----23,561.66 ---SEI
25-Jun-
26
25-Jun-26 31397QRE
0
FNM2841
I 310 INTEREST EARNED ON F
N M A GTD REMIC
2.472% 2/25/41 $1 PV ON
182.2800 SHARES DUE
6/25/2026 $0.00367/PV ON
49,638.06 PV DUE
6/25/26
-----182.28 ---SEI
25-Jun-
26
25-Jun-26 31406XWT
5
823358A
I 310 INTEREST EARNED ON F
N M A #823358 5.954%
2/01/35 $1 PV ON 49.8100
SHARES DUE 6/25/2026
MAY FNMA DUE
6/25/26
-----49.81 ---SEI
25-Jun-
26
25-Jun-26 3138EG6F
6
AL0869A
I 310 INTEREST EARNED ON F
N M A #AL0869 4.500%
6/01/29 $1 PV ON 3.9300
SHARES DUE 6/25/2026
MAY FNMA DUE
6/25/26
-----3.93 ---SEI
25-Jun-
26
25-Jun-26 31410F4V
4
888336A
I 310 INTEREST EARNED ON F
N M A #888336 5.000%
7/01/36 $1 PV ON
173.4900 SHARES DUE
6/25/2026 MAY FNMA
DUE 6/25/26
-----173.49 ---SEI
25-Jun-
26
25-Jun-26 31376KT
22
357969A
I 310 INTEREST EARNED ON F
N M A #357969 5.000%
9/01/35 $1 PV ON
113.1200 SHARES DUE
6/25/2026 MAY FNMA
DUE 6/25/26
-----113.12 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 40 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-26 31406PQY
8
815971A
I 310 INTEREST EARNED ON F
N M A #815971 5.000%
3/01/35 $1 PV ON
133.9300 SHARES DUE
6/25/2026 MAY FNMA
DUE 6/25/26
-----133.93 ---SEI
25-Jun-
26
25-Jun-26 31417YAY
3
MA0022A
I 310 INTEREST EARNED ON F
N M A #MA0022
4.500% 4/01/29 $1 PV ON
6.5100 SHARES DUE
6/25/2026 MAY FNMA
DUE 6/25/26
-----6.51 ---SEI
25-Jun-
26
25-Jun-26 31403DJZ
3
745580A
I 310 INTEREST EARNED ON F
N M A #745580 5.000%
6/01/36 $1 PV ON
103.6600 SHARES DUE
6/25/2026 MAY FNMA
DUE 6/25/26
-----103.66 ---SEI
25-Jun-
26
25-Jun-26 31371NUC
7
257179A
I 310 INTEREST EARNED ON F
N M A #257179 4.500%
4/01/28 $1 PV ON 2.5300
SHARES DUE 6/25/2026
MAY FNMA DUE
6/25/26
-----2.53 ---SEI
25-Jun-
26
25-Jun-26 31407BXH
7
826080A
I 310 INTEREST EARNED ON F
N M A #826080 5.000%
7/01/35 $1 PV ON 19.5300
SHARES DUE 6/25/2026
MAY FNMA DUE
6/25/26
-----19.53 ---SEI
25-Jun-
26
25-Jun-26 31403GXF
4
748678A
I 310 INTEREST EARNED ON F
N M A #748678 5.000%
10/01/33 $1 PV ON 1.5100
SHARES DUE 6/25/2026
MAY FNMA DUE
6/25/26
-----1.51 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 41 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-26 3140XQTZ
0
FS8667A
I 310 INTEREST EARNED ON F
N M A #FS8667 3.000%
10/01/30 $1 PV ON
8233.4800 SHARES DUE
6/25/2026 MAY FNMA
DUE 6/25/26
-----8,233.48 ---SEI
25-Jun-
26
25-Jun-26 3137FG6X
8
FHL3828B
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
3.850% 5/25/28 $1 PV ON
23260.4100 SHARES DUE
6/25/2026 $0.00321/PV ON
7,250,000.00 PV DUE
6/25/26
-----23,260.41 ---SEI
25-Jun-
26
25-Jun-26 3137HDJJ
0
FHL4829B
I 310 INTEREST EARNED ON F
H L M C MLTCL MTG
4.803% 5/25/29 $1 PV ON
35044.2700 SHARES DUE
6/25/2026 $0.00400/PV ON
8,755,594.56 PV DUE
6/25/26
-----35,044.27 ---SEI
25-Jun-
26
25-Jun-26 3137HB3D
4
FHL5028
I 310 INTEREST EARNED ON F
H L M C MLTCL 5.069%
10/25/28 $1 PV ON
45266.1700 SHARES DUE
6/25/2026 $0.00422/PV ON
10,716,000.00 PV DUE
6/25/26
-----45,266.17 ---SEI
25-Jun-
26
25-Jun-26 3137HBPD
0
FHL5429
I 310 INTEREST EARNED ON F
H L M C MLTCL MTG
5.400% 1/25/29 $1 PV ON
45000.0000 SHARES DUE
6/25/2026 $0.00450/PV ON
10,000,000.00 PV DUE
6/25/26
-----45,000.00 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 42 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-26 31394JY35
FHL9543
I 310 INTEREST EARNED ON F
H L M C MLTCL MT
6.49999% 9/25/43 $1 PV
ON 1342.9800 SHARES
DUE 6/25/2026
$0.00542/PV ON
247,935.42 PV DUE
6/25/26
-----1,342.98 ---SEI
25-Jun-
26
25-Jun-26 3137HCKV
3
I 310 INTEREST EARNED ON F
H L M C MLTCL MTG
5.180% 3/25/29 $1 PV ON
27281.3300 SHARES DUE
6/25/2026 $0.00432/PV ON
6,320,000.00 PV DUE
6/25/26
-----27,281.33 ---SEI
25-Jun-
26
25-Jun-26 3137BSRE
5
I 310 INTEREST EARNED ON F
H L M C MLTCL MTG
3.120% 9/25/26 $1 PV ON
12775.1500 SHARES DUE
6/25/2026 $0.00260/PV ON
4,913,520.45 PV DUE
6/25/26
-----12,775.15 ---SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 05592XAD
2
BVO5428
P 20 PAID DOWN PAR VALUE
OF BMW VEH OWNER TR
5.470% 2/25/28
-52,420.4000 ----52,420.40 -52,411.11 -9.29 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3136AJZP
4
P 20 PAID DOWN PAR VALUE
OF F N M A GTD REMIC
1.500% 4/25/29
-19,172.7600 ----19,172.76 -17,515.10 -1,657.66 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31397QRE
0
FNM2841
P 20 PAID DOWN PAR VALUE
OF F N M A GTD REMIC
2.472% 2/25/41
-791.6400 ----791.64 -791.39 -0.25 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31407BXH
7
826080A
P 20 PAID DOWN PAR VALUE
OF F N M A #826080
5.000% 7/01/35 MAY
FNMA DUE 6/25/26
-42.5800 ----42.58 -45.77 --3.19 SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 43 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-
26
25-Jun-26 31406XWT
5
823358A
P 20 PAID DOWN PAR VALUE
OF F N M A #823358
5.954% 2/01/35 MAY
FNMA DUE 6/25/26
-79.4000 ----79.40 -78.78 -0.62 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3138EG6F
6
AL0869A
P 20 PAID DOWN PAR VALUE
OF F N M A #AL0869
4.500% 6/01/29 MAY
FNMA DUE 6/25/26
-37.1800 ----37.18 -39.32 --2.14 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31403DJZ
3
745580A
P 20 PAID DOWN PAR VALUE
OF F N M A #745580
5.000% 6/01/36 MAY
FNMA DUE 6/25/26
-280.3100 ----280.31 -301.33 --21.02 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31371NUC
7
257179A
P 20 PAID DOWN PAR VALUE
OF F N M A #257179
4.500% 4/01/28 MAY
FNMA DUE 6/25/26
-34.4900 ----34.49 -36.48 --1.99 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31406PQY
8
815971A
P 20 PAID DOWN PAR VALUE
OF F N M A #815971
5.000% 3/01/35 MAY
FNMA DUE 6/25/26
-290.3800 ----290.38 -312.16 --21.78 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31417YAY
3
MA0022A
P 20 PAID DOWN PAR VALUE
OF F N M A #MA0022
4.500% 4/01/29 MAY
FNMA DUE 6/25/26
-61.8400 ----61.84 -65.40 --3.56 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31376KT
22
357969A
P 20 PAID DOWN PAR VALUE
OF F N M A #357969
5.000% 9/01/35 MAY
FNMA DUE 6/25/26
-230.6100 ----230.61 -247.91 --17.30 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31403GXF
4
748678A
P 20 PAID DOWN PAR VALUE
OF F N M A #748678
5.000% 10/01/33 MAY
FNMA DUE 6/25/26
-3.6100 ----3.61 -3.88 --0.27 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3140XQTZ
0
FS8667A
P 20 PAID DOWN PAR VALUE
OF F N M A #FS8667
3.000% 10/01/30 MAY
FNMA DUE 6/25/26
-110,022.9400 ----110,022.94 -108,441.36 1,581.58 -SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 44 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
25-Jun-
26
25-Jun-
26
25-Jun-26 31410F4V
4
888336A
P 20 PAID DOWN PAR VALUE
OF F N M A #888336
5.000% 7/01/36 MAY
FNMA DUE 6/25/26
-500.9700 ----500.97 -538.54 --37.57 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
218,446.4300 -----218,446.43 218,446.43 --SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3137HDJJ
0
FHL4829B
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MTG
4.803% 5/25/29
-3,731.8500 ----3,731.85 -3,747.01 --15.16 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31394JY35
FHL9543
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MT
6.49999% 9/25/43
-1,980.2500 ----1,980.25 -2,242.63 --262.38 SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 3137BSRE
5
P 20 PAID DOWN PAR VALUE
OF F H L M C MLTCL MTG
3.120% 9/25/26
-82,562.7300 ----82,562.73 -85,428.22 --
2,865.49
SEI
25-Jun-
26
25-Jun-
26
25-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
278,245.1400 -----278,245.14 278,245.14 --SEI
Post Date 25-Jun-26 Total ----224,445.18 1,581.58 -
1,584.03
SEI
30-Jun-
26
30-Jun-26 91282CJQ
5
I 310 INTEREST EARNED ON U
S TREASURY NT
3.750% 12/31/30 $1 PV ON
16125000.0000 SHARES
DUE 6/30/2026
-----302,343.75 ---SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 45 of 46
Multiple Accounts
Begin Date : 06/01/2026 End Date : 06/30/2026
Account Information
Account Number Account Name
OCSD LONG-TERM PORTFOLIO
Transactions
Post
Date
Trade
Date
Settlement
Date
CUSIP
Ticker
SEDOL
Port
P/I
Tran
Type Explanation Units Price Comm
SEC
Fee
Misc
Fee
Net Cash
Amount Cost
Short
Term
Gain/Loss
Long
Term
Gain
Loss Source System
30-Jun-
26
30-Jun-26 91282CHJ
3
I 310 INTEREST EARNED ON U
S TREASURY NT
3.750% 6/30/30 $1 PV ON
4900000.0000 SHARES
DUE 6/30/2026
-----91,875.00 ---SEI
30-Jun-
26
30-Jun-26 91282CMD
0
I 310 INTEREST EARNED ON U
S TREASURY NT
4.375% 12/31/29 $1 PV ON
5750000.0000 SHARES
DUE 6/30/2026
-----125,781.25 ---SEI
30-Jun-
26
30-Jun-26 91282CPR
6
I 310 INTEREST EARNED ON U
S TREASURY NT
3.625% 12/31/30 $1 PV ON
13000000.0000 SHARES
DUE 6/30/2026
-----235,625.00 ---SEI
30-Jun-
26
30-Jun-
26
30-Jun-26 31846V567
FGZXX
P 10 PURCHASED UNITS OF
FIRST AM GOVT OB FD
CL Z
755,625.0000 -----755,625.00 755,625.00 --SEI
Post Date 30-Jun-26 Total ----755,625.00 --SEI
Account 6745046601 Total ----2,628,259.79 -
243,484.1
0
450,616.
33
SEI
Account Ending Cash Principal Cash: -
123,232,180.36
Income Cash:
123,232,180.36
Total Cash: -
Grand Total -----
96,583,955.1
3
-
193,739.4
0
450,616.
33
SEI
TRANSACTIONS - SUMMARY Run Date : 07/01/2026 Page 46 of 46
OPERATIONS COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5009 Agenda Date:7/22/2026 Agenda Item No:5.
FROM:Robert Thompson, General Manager
Originator: Riaz Moinuddin, Director of Operations & Maintenance
SUBJECT:
COMBINATION SEWER CLEANING TRUCK REFURBISHMENT
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve a Sole Source Purchase Order to Haaker Equipment Company to refurbish one
Combination Sewer Cleaning Truck for a total amount not to exceed $402,186, not including
applicable sales tax and freight; and
B. Approve a contingency of $60,328 (15%).
BACKGROUND
Orange County Sanitation District (OC San)owns and operates four Combination Sewer Cleaning
trucks within its fleet.The trucks maintain the collection systems by cleaning sewer pipes and pump
station wet wells,and by responding to emergencies such as sewer spills,using a combination of
vacuum and water-jetting technology.
The Combination Sewer Cleaning trucks consist of specialized cleaning equipment with controls,
hydraulic systems,and a large tank debris body mounted on a chassis.These trucks service more
than 380 miles of regional pipes and 15 outlying pump stations,three reliable units are required to
complete the annual volume of work and comply with the Sewer System Management Plan (SSMP)
as required by the State Water Resources Control Board (SWRCB).
RELEVANT STANDARDS
·Participate in local, state, and national cooperative purchasing programs
·Maintain a proactive asset management program
·Ensure the public’s money is wisely spent
PROBLEM
The truck identified for refurbishment is experiencing increasing electrical,mechanical,and hydraulic
failures due to age and corrosion.Continued repairs are becoming less effective and cost-efficient,
making refurbishment or replacement the only viable long-term options.
Orange County Sanitation District Printed on 7/13/2026Page 1 of 3
powered by Legistar™
File #:2026-5009 Agenda Date:7/22/2026 Agenda Item No:5.
PROPOSED SOLUTION
Refurbish the truck through the Original Equipment Manufacturer (OEM)-authorized service
representative to restore the equipment to near-new condition,improve reliability,and maximize its
remaining useful life at a lower cost than replacement.
TIMING CONCERNS
Delaying the refurbishment would increase the risk of equipment downtime and reduce OC San’s
ability to maintain adequate fleet availability of Combination Sewer Cleaning trucks to support
scheduled cleaning, emergency response and regulatory compliance activities.
RAMIFICATIONS OF NOT TAKING ACTION
Continued deterioration of the truck could result in extended downtime,increased reliance on rental
equipment,higher maintenance costs,and reduced fleet availability.This could impair OC San’s
ability to perform scheduled cleaning activities and respond effectively to collection system
emergencies.
PRIOR COMMITTEE/BOARD ACTIONS
August 2017 -Approved Vactor as an Original Equipment Manufacturer (OEM)Sole Source for
industrial cleaning truck rental and repairs.
ADDITIONAL INFORMATION
OC San’s Board of Directors approved Vactor as the OEM sole source provider under Board M.O.9
(B)on August 23,2017.Haaker Equipment Company is Vactor’s sole authorized dealer for Vactor in
Southern California.By using the OEM-authorized dealer and OEM parts,OC San received a
discount of $37,730.
The truck profiled for refurbishment is seven years old and has a reliably operating chassis.The
installed equipment on the chassis will be restored to near-new condition,allowing OC San to
operate the unit well into its profiled 15-year life cycle.Refurbishment is significantly less costly than
replacing the vehicle and allows OC San to extend the useful life of an existing asset with a
serviceable chassis.
With newly adopted and imposed regulations (CARB Advanced Clean Fleets)affecting heavy-duty
vehicles,the unit would need to be replaced as an alternative-fueled/electric vehicle at a substantially
higher cost in a market with supply chain delays.Keeping this unit in OC San’s fleet ensures the
reliability of critical equipment for maintaining the collection system.
A 15%contingency is recommended to address any additional repairs or replacement components
identified during the refurbishment process.
CEQA
N/A
Orange County Sanitation District Printed on 7/13/2026Page 2 of 3
powered by Legistar™
File #:2026-5009 Agenda Date:7/22/2026 Agenda Item No:5.
FINANCIAL CONSIDERATIONS
This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has
been budgeted (Budget FY 2026-27 and 2027-28,Section 8,Page 82),and the budget is sufficient
for the recommended action.
Date of Approval Contract Amount Contingency
07/22/2026 $402,186 $60,328 (15%)
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
N/A
Orange County Sanitation District Printed on 7/13/2026Page 3 of 3
powered by Legistar™
OPERATIONS COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5010 Agenda Date:7/22/2026 Agenda Item No:6.
FROM:Robert Thompson, General Manager
Originator: Riaz Moinuddin, Director of Operations & Maintenance
SUBJECT:
GAS COMPRESSOR INTERCOOLERS CRITICAL SPARES
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve a Sole Source Purchase Order to NEAC Compressor Service USA, Inc., for the
procurement of two spare intercoolers for digester gas compressors in an amount not to
exceed $246,754, not including applicable sales tax and freight; and
B. Approve a contingency of $24,675 (10%).
BACKGROUND
The Orange County Sanitation District (OC San)operates six gas compressors between Plant Nos.1
and 2 to increase the compression of methane gas generated during the anaerobic digestion
process.The compressed gas is transferred to the Central Generation facilities,where it fuels the
engine-generator units to produce electricity for both treatment plants.
The intercoolers are integral to maintaining equipment reliability and the continued operation of the
gas compressors.
NEAC Compressor Service USA,Inc.(NEAC)is the Board of Directors approved original equipment
manufacturer (OEM)representative and the sole authorized distributor of compressor equipment and
replacement parts.As the sole authorized source for these OEM intercoolers,NEAC ensures
compliance with manufacturer specifications and compatibility with the existing compressor systems.
RELEVANT STANDARDS
·Protect OC San assets
·24/7/365 treatment plant reliability
·Maintain a proactive asset management program
PROBLEM
Due to the corrosive gases processed and their environments,the gas compressors intercoolers are
susceptible to corrosion,resulting in reduced performance and reliability over time.ExistingOrange County Sanitation District Printed on 7/13/2026Page 1 of 3
powered by Legistar™
File #:2026-5010 Agenda Date:7/22/2026 Agenda Item No:6.
susceptible to corrosion,resulting in reduced performance and reliability over time.Existing
intercoolers are showing early signs of corrosion and performance degradation.OC San currently
has no spare intercoolers in inventory,and replacement units require a minimum lead time of 22
weeks.In the event of failure,the affected compressor could remain out of service for an extended
period, increasing the risk of process disruptions and reduced plant reliability.
PROPOSED SOLUTION
Approve the purchase of two OEM intercoolers from NEAC to maintain gas compressor reliability,
support planned compressor overhauls,and minimize downtime associated with equipment failure or
maintenance activities.
TIMING CONCERNS
Timely procurement of the spare intercoolers is necessary to support planned digester gas
compressor overhauls.Due to the lead time associated with these specialized OEM components,
delays in procurement may affect equipment availability, overhaul scheduling, and plant reliability.
RAMIFICATIONS OF NOT TAKING ACTION
Failure to maintain an adequate inventory of critical spare parts could result in extended gas
compressor downtime,reducing the availability of digester gas compression and impacting electrical
power generation for both treatment plants.Prolonged equipment outages may also adversely affect
plant operations and OC San’s ability to maintain compliance with operational and regulatory permit
requirements.
PRIOR COMMITTEE/BOARD ACTIONS
May 2020 -Approved Penn Process Compressors (vendor NEAC Compressor Service USA)as an
Original Equipment Manufacturer (OEM) Sole Source provider for pistons and parts.
ADDITIONAL INFORMATION
NEAC is the Board of Directors approved OEM representative and the sole authorized distributor for
equipment and replacement components.
CEQA
N/A
FINANCIAL CONSIDERATIONS
This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been
budgeted (Budget FY 2026-2027 and 2027-2028),Section 6,Page 124,Repairs &Maintenance)
and the budget is sufficient for the recommended action.
Date of Approval Contract Amount Contingency
07/22/2026 $246,754 $24,675 (10%)Orange County Sanitation District Printed on 7/13/2026Page 2 of 3
powered by Legistar™
File #:2026-5010 Agenda Date:7/22/2026 Agenda Item No:6.
Date of Approval Contract Amount Contingency
07/22/2026 $246,754 $24,675 (10%)
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·N/A
SP:at:dh:mm
Orange County Sanitation District Printed on 7/13/2026Page 3 of 3
powered by Legistar™
OPERATIONS COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5011 Agenda Date:7/22/2026 Agenda Item No:7.
FROM:Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering
SUBJECT:
ON-CALL CONDITION ASSESSMENT PROGRAM SUPPORT SERVICES,SPECIFICATION NO.S
-2026-720BD
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve a Services Contract with Jamison Engineering Contractors, Inc. to provide on-call
condition assessment program support services, Specification No. S-2026-720BD, for the
period of August 1, 2026, through June 30, 2027, for a total amount not to exceed $1,114,638
with four (4) one-year renewal options;
B. Approve an annual increase not to exceed 3.5% of the previous year’s amount; and
C. Approve an annual contingency not to exceed 10% of the annual contract amount for all
renewal periods.
BACKGROUND
Orange County Sanitation District (OC San)utilizes contractor services to support the performance of
critical equipment and facility condition assessments.Condition assessments are a key component
of OC San’s Asset Management Program as they provide vital information related to the current
status of critical equipment,structures,and facilities throughout both reclamation plants and the
collection system.This information is utilized to determine remaining useful life and impacts the
planning and execution of maintenance efforts and capital projects.
Condition assessments often occur in challenging locations.These locations may include confined
spaces,areas that require heavy cleaning or grit removal,spaces that require labor or equipment to
access (i.e.an area secured by a hatch or gate),and areas that can only be feasibly inspected via
methods or technology not readily available to staff.Utilizing a contractor to support these efforts
provides effective execution in a safe, reliable manner.
In addition,during the performance of a condition assessment,minor issues may be encountered
that require repair.Enabling the performance of incidental repairs at the time of the assessment
prevents these issues from worsening,minimizes operational impacts,and prevents duplicative
efforts necessary to access and prepare the area to perform the work.
Orange County Sanitation District Printed on 7/13/2026Page 1 of 4
powered by Legistar™
File #:2026-5011 Agenda Date:7/22/2026 Agenda Item No:7.
RELEVANT STANDARDS
·Protect OC San assets
·Maintain a proactive asset management program
·24/7/365 treatment plant reliability
PROBLEM
The current on-call contractor support services contract expires on October 31,2026.Without a new
contract in place,performance of planned assessments cannot be executed efficiently,and the asset
management program will be impacted.
PROPOSED SOLUTION
Approve a Services Contract with Jamison Engineering Contractors,Inc.to provide on-call contractor
support services for OC San’s condition assessment program.
TIMING CONCERNS
The current contract will expire on October 31,2026.Having a new on-call contractor support
services contract in place prior to the current contract’s expiration will ensure that planned condition
assessments are not impacted.
RAMIFICATIONS OF NOT TAKING ACTION
If no action is taken,planned condition assessments will be delayed,impacting the effectiveness of
the asset management program.Separate procurements for support services would be required on
a case-by-case basis; this is less efficient and requires more resources to manage and execute.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
A Request for Proposal (RFP)was advertised on March 17,2026,for Condition Assessment On-Call
Contractor Support Services and was available to firms that were registered on the OC San Bidding
System.The RFP indicated that award would be made to up to two proposers that meet the
minimum qualification requirements.A non-mandatory pre-proposal meeting was conducted virtually
on March 31, 2026.
The following evaluation criteria were described in the RFP and used to determine the most qualified
company.
Orange County Sanitation District Printed on 7/13/2026Page 2 of 4
powered by Legistar™
File #:2026-5011 Agenda Date:7/22/2026 Agenda Item No:7.
CRITERION WEIGHT
1. Qualifications & Experience of Firm 200 Points
2. Proposed Staffing & Project Organization 300 Points
3. Work Plan 300 Points
4. Cost 200 Points
One proposal was received on April 16,2026,and evaluated in accordance with OC San’s policies
and procedures by a team consisting of an OC San Engineer,Operations Supervisor,Maintenance
Superintendent,and Principal Safety &Health Specialist.A purchasing representative chaired the
team as a non-voting member.
The evaluation team first reviewed and scored the proposal based upon the criteria listed above,
other than cost.
Criterion 1
(Max 200)
Criterion 2
(Max 300)
Criterion 3
(Max 300)
Subtotal Score
(Max 800)
Jamison
Engineering
Contractors, Inc.
176 246 265 687
Staff determined that Jamison Engineering Contractors,Inc.,is qualified based on the firm’s and
project team’s qualifications and safety records.They have the appropriate relevant experience with
OC San and other agencies conducting similar work.Their approach and understanding of the work
were determined to be satisfactory.
The proposal was accompanied by a sealed cost proposal.The cost proposal was opened and
negotiated.
Rank Proposer Subtotal Score
Without cost
(Max 800)
Cost (Max
200)
Subtotal Score
(Max 800)
1.Jamison Engineering
Contractors, Inc.
687 200 887
After a complete evaluation,Jamison Engineering Contractors,Inc.,was invited to submit a Best and
Final Offer (BAFO). The submitted BAFO remained unchanged from the originally submitted cost.
Rank Proposer Original Cost Best and Final Offer
1.Jamison Engineering
Contractors, Inc.
$1,114,638 $1,114,638
Staff recommends approval of a Services Contract with Jamison Engineering Contractors,Inc.for an
amount not to exceed $1,114,638 for the period from August 1,2026,through June 30,2027,with
four (4)one-year renewal options aligned with the subsequent fiscal years and with up to an annual
escalation of 3.5% and an annual contingency of 10%.
Orange County Sanitation District Printed on 7/13/2026Page 3 of 4
powered by Legistar™
File #:2026-5011 Agenda Date:7/22/2026 Agenda Item No:7.
CEQA
This is not a project as defined by the California Environmental Quality Act (CEQA),therefore CEQA
does not apply.
FINANCIAL CONSIDERATIONS
This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been
budgeted (Budget FY 2026-27 and 2027-28,Section 6,Page 79)and the budget is sufficient for the
recommended action.
Date of Approval Contract Amount Contingency
07/22/2026 $1,114,638 $111,464 (10%)
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Services Contract
Orange County Sanitation District Printed on 7/13/2026Page 4 of 4
powered by Legistar™
Services Contract 1 of 11 Specification No. S-2026-720BD
Revision 121924
SERVICES CONTRACT
ON-CALL CONDITION ASSESSMENT PROGRAM SUPPORT SERVICES
Specification No. S-2026-720BD
This SERVICES CONTRACT (hereinafter referred to as “Contract”), is made and entered into as of
the date fully executed below, by and between Orange County Sanitation District (hereinafter
referred to as “OC San”) and Jamison Engineering Contractors, Inc. (hereinafter referred to as
“Contractor”), and collectively referred to herein as the “Parties.”
R E C I T A L S
WHEREAS, OC San desires to retain the services of Contractor for On-call Condition Assessment
Program Support Services (“Services”) as described in Exhibit “A” attached hereto and incorporated
herein by this reference; and
WHEREAS, Contractor is qualified to perform the Services by virtue of experience, training,
education, and expertise; and
WHEREAS, OC San desires to engage Contractor to provide the Services; and
WHEREAS, OC San selected Contractor to provide the Services in accordance with OC San’s
current Purchasing Ordinance; and
WHEREAS, on July 22, 2026, OC San’s Board of Directors of OC San, by minute order, authorized
execution of this Contract.
NOW, THEREFORE, in consideration of the above recitals and the mutual promises and benefits
specified below, the Parties agree as follows:
1. General.
1.1 This Contract and all exhibits hereto are made by OC San and Contractor. The terms and
conditions herein exclusively govern the purchase of Services as described in Exhibit “A”.
1.2 The term “Task Order”, when referenced under this Contract, shall mean an order issued
by the OC San Project Manager or designee for a specific scope of work.
1.3 Task Orders issued under this Contract shall be incorporated by reference and made part
hereof, upon issuance of the Task Order.
1.4 The following exhibits, in order of precedence, are incorporated by reference and made
part of this Contract.
Exhibit “A” – Scope of Work
Exhibit “B” – Proposal
Exhibit “C” – Determined Insurance Requirement Form
Exhibit “D” – Contractor Safety Standards
Exhibit “E” – Human Resources Policies
Exhibit “F” – General Conditions
Services Contract 2 of 11 Specification No. S-2026-720BD
Revision 121924
1.5 In the event of any conflict or inconsistency between the provisions of this Contract and
any of the provisions of the exhibits hereto, the provisions in the Contract shall control
and thereafter the provisions in the document highest in precedence shall be controlling.
1.6 The provisions of this Contract and attachments hereto are applicable at the Task Order
level.
1.7 Except as expressly provided otherwise, OC San accepts no liability for any expenses,
losses, or actions incurred or undertaken by Contractor as a result of work performed in
anticipation of acquisition of the Services by OC San.
1.8 Work Hours: Shall be as specified in Exhibit “A.”
1.9 Days: Shall mean calendar days, unless otherwise noted.
1.10 OC San holidays (non-working days) are as follows: New Year’s Day, Martin Luther King,
Jr. Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Veterans Day,
Thanksgiving Day, Day after Thanksgiving, Christmas Eve, and Christmas Day.
1.11 Work: Shall mean all work, labor, and materials necessary to provide the Services.
1.12 The provisions of this Contract and provisions of the Task Orders may be amended or
waived only by an amendment executed by authorized representatives of both Parties.
1.13 The various headings in this Contract are inserted for convenience only and shall not
affect the meaning or interpretation of this Contract or any paragraph or provision hereof.
2. Scope of Work.
2.1 Contractor shall perform the Services identified in Exhibit “A” in accordance with generally
accepted industry and professional standards.
2.2 Modifications to Scope of Work. OC San shall have the right to modify the Scope of Work
at any time. All modifications must be made by an amendment signed by both Parties.
2.3 Familiarity with Work. By executing this Contract, Contractor warrants that: (a) it has
investigated the work to be performed; and (b) it understands the facilities, difficulties,
and restrictions of the work under this Contract. Should Contractor discover any latent
or unknown condition materially differing from those inherent in the work or as
represented by OC San, it shall immediately inform OC San of this and shall not proceed,
except at Contractor’s risk, until written instructions are received from OC San.
2.4 Performance. Time is of the essence in the performance of the provisions hereof.
3. Contract Term.
The term of this Contract shall be for eleven months commencing on August 1, 2026 and
continuing through June 30, 2027.
3.1 Renewals. At its sole discretion, OC San may exercise the option to renew this Contract
for up to four (4) one-year periods. This Contract may be renewed by an OC San
Purchase Order. OC San shall have no obligation to renew the Contract nor to give a
reason if it elects not to renew it.
Services Contract 3 of 11 Specification No. S-2026-720BD
Revision 121924
3.2 Extensions. The term of this Contract may be extended only by an amendment signed
by both Parties.
4. Compensation.
4.1 As compensation for the Services provided under this Contract, OC San shall pay
Contractor a total amount not to exceed (NTE) One Million One Hundred Fourteen
Thousand Six Hundred Thirty-Eight Dollars ($1,114,638.00), as specified in Exhibit B.
4.2 Contractor shall provide OC San with all required premiums and/or overtime work
at no charge beyond the amount specified above.
5. Payments and Invoicing.
5.1 OC San shall pay itemized invoices for work completed in accordance with Exhibit “A”
thirty (30) days from receipt of the invoice and after approval by OC San’s Project
Manager or designee. OC San shall be the determining party, in its sole discretion, as to
whether the Services have been satisfactorily completed.
5.2 Contractor shall submit its invoices to OC San Accounts Payable by electronic mail to
APStaff@OCSan.gov. In the subject line include “INVOICE” and the Purchase Order
Number.
6. California Department of Industrial Relations Registration and Record of Wages.
6.1 To the extent Contractor’s employees and/or its subcontractors perform work related to
this Contract for which Prevailing Wage Determinations have been issued by the
California Department of Industrial Relations (DIR) as more specifically defined under
Labor Code section 1720 et seq., prevailing wages are required to be paid for applicable
work under this Contract. It is Contractor’s responsibility to interpret and implement any
prevailing wage requirements and Contractor agrees to pay any penalty or civil damages
resulting from a violation of the prevailing wage laws.
6.2 Contractor and its subcontractors shall comply with the registration requirements of Labor
Code section 1725.5. Pursuant to Labor Code section 1771.4(a)(1), the work is subject
to compliance monitoring and enforcement by the California Department of Industrial
Relations (DIR).
6.3 Pursuant to Labor Code section 1773.2, a copy of the prevailing rate of per diem wages
is available upon request at OC San’s principal office. The prevailing rate of per diem
wages may also be found at the DIR website for prevailing wage determinations at
http://www.dir.ca.gov/DLSR/PWD.
6.4 Contractor and its subcontractors shall comply with the job site notices posting
requirements established by the Labor Commissioner per Title 8, California Code of
Regulations section 16461(e). Pursuant to Labor Code sections 1773.2 and
1771.4(a)(2), Contractor shall post a copy of the prevailing rate of per diem wages at the
job site.
6.5 Contractor and its subcontractors shall maintain accurate payroll records and shall
comply with all the provisions of Labor Code section 1776. Contractor and its
subcontractors shall submit payroll records to the Labor Commissioner pursuant to Labor
Code section 1771.4(a)(3). Pursuant to Labor Code section 1776, Contractor and its
Services Contract 4 of 11 Specification No. S-2026-720BD
Revision 121924
subcontractors shall furnish a copy of all certified payroll records to OC San and/or the
general public upon request, provided the public request is made through OC San, the
Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement of
the Department of Industrial Relations. Pursuant to Labor Code section 1776(h),
penalties for non-compliance with a request for payroll records may be deducted from
progress payments.
6.5.1 As a condition to receiving payments, Contractor agrees to present to OC San,
along with any request for payment, all applicable and necessary certified payrolls
and other required documents for the period covering such payment request.
Pursuant to Title 8, California Code of Regulations section 16463, OC San shall
withhold any portion of a payment, up to and including the entire payment amount,
until certified payroll forms and any other required documents are properly
submitted. In the event certified payroll forms do not comply with the
requirements of Labor Code section 1776, OC San may continue to withhold
sufficient funds to cover estimated wages and penalties under the Contract.
6.6 Contractor and its subcontractors shall comply with Labor Code section 1774 and section
1775. Pursuant to Labor Code section 1775, Contractor and any of its subcontractors
shall forfeit to OC San a penalty of not more than two hundred dollars ($200) for each
calendar day, or portion thereof, for each worker paid less than the prevailing rates as
determined by the DIR for the work or craft in which the worker is employed for any work.
6.6.1 In addition to the penalty and pursuant to Labor Code section 1775, the difference
between the prevailing wage rates and the amount paid to each worker for each
calendar day or portion thereof for which each worker was paid less than the
prevailing wage rate shall be paid to each worker by Contractor or its
subcontractor.
6.7 Contractor and its subcontractors shall comply with Labor Code sections 1810 through
1815. Contractor and its subcontractors shall restrict working hours to eight (8) hours per
day and forty (40) hours per week, except that work performed in excess of those limits
shall be permitted upon compensation for all excess hours worked at not less than one
and one-half (1.5) times the basic rate of pay, as provided in Labor Code section 1815.
Contractor shall forfeit, as a penalty to OC San, twenty-five dollars ($25) per worker per
calendar day during which such worker is required or permitted to work more than eight
(8) hours in any one calendar day and forty (40) hours in any one calendar week in
violation of Labor Code sections 1810 through 1815.
6.8 Contractor and its subcontractors shall comply with Labor Code sections 1777.5, 1777.6,
and 1777.7 concerning the employment of apprentices by Contractor or any
subcontractor.
6.9 Contractor shall include, at a minimum, a copy of the following provisions in any contract
it enters into with any subcontractor: Labor Code sections 1771, 1771.1, 1775, 1776,
1777.5, 1810, 1813, 1815, 1860, and 1861.
6.10 Pursuant to Labor Code sections 1860 and 3700, Contractor and its subcontractors will
be required to secure the payment of compensation to employees. Pursuant to Labor
Code section 1861, Contractor, by accepting this contract, certifies that:
Services Contract 5 of 11 Specification No. S-2026-720BD
Revision 121924
“I am aware of the provisions of section 3700 of the Labor Code which require
every employer to be insured against liability for workers’ compensation or to
undertake self-insurance in accordance with the provisions of that code, and
I will comply with such provisions before commencing the performance of the
work of this contract.”
Contractor shall ensure that all its contracts with its subcontractors provide the provision
above.
7. Davis-Bacon Act. Not Used.
8. Damage to OC San’s Property. Any of OC San’s property damaged by Contractor, any
subcontractor, or by the personnel of either will be subject to repair or replacement by
Contractor at no cost to OC San.
9. Freight (F.O.B. Destination). Contractor assumes full responsibility for all transportation,
transportation scheduling, packing, handling, insurance, and other services associated with
delivery of all products deemed necessary under this Contract.
10. Audit Rights. Contractor agrees that, during the term of this Contract and for a period of three
(3) years after its expiration or termination, OC San shall have access to and the right to
examine any directly pertinent books, documents, and records of Contractor relating to the
invoices submitted by Contractor pursuant to this Contract.
11. Contractor Safety Standards and Human Resources Policies. OC San requires Contractor
and its subcontractor(s) to follow and ensure their employees follow all Federal, State, and
local regulations as well as the Contractor Safety Standards while working at OC San locations.
If, during the course of the Contract, it is discovered that the Contractor Safety Standards do
not comply with Federal, State, or local regulations, Contractor is required to follow the most
stringent regulatory requirement at no additional cost to OC San. Contractor, its
subcontractors, and all of their employees shall adhere to the safety requirements in Exhibit
“A,” all applicable Contractor Safety Standards in Exhibit “D,” and the Human Resources
Policies in Exhibit “E.”
12. Insurance. Contractor and all its subcontractors shall purchase and maintain, throughout the
term of this Contract and any periods of warranty or extensions, insurance in amounts equal
to the requirements set forth in the signed Exhibit “C” – Determined Insurance Requirement
Form. Contractor shall not commence work under this Contract until all required insurance is
obtained in a form acceptable to OC San, nor shall Contractor allow any subcontractor to
commence service pursuant to a subcontract until all insurance required of the subcontractor
has been obtained. Failure to obtain and maintain the required insurance coverage shall result
in termination of this Contract.
13. Bonds. Not Used.
14. Indemnification and Hold Harmless Provision. Contractor shall assume all responsibility
for damages to property and/or injuries to persons, including accidental death, which may arise
out of or may be caused by Contractor’s Services under this Contract, or by its
subcontractor(s), or by anyone directly or indirectly employed by Contractor, and whether such
damage or injury shall accrue or be discovered before or after the termination of the Contract.
Except as to the sole active negligence of or willful misconduct of OC San, Contractor shall
Services Contract 6 of 11 Specification No. S-2026-720BD
Revision 121924
indemnify, protect, defend, and hold harmless OC San, its elected and appointed officials,
officers, agents, and employees from and against any and all claims, liabilities, damages, or
expenses of any nature, including attorneys’ fees: (a) for injury to or death of any person, or
damage to property, or interference with the use of property arising out of or in connection with
Contractor’s performance under the Contract, and/or (b) on account of use of any copyrighted
or uncopyrighted material, composition, or process; or any patented or unpatented invention,
article, or appliance furnished or used under the Contract, and/or (c) on account of any goods
and services provided under this Contract. This indemnification provision shall apply to any
acts or omissions, willful misconduct, or negligent misconduct, whether active or passive, on
the part of Contractor or anyone employed by or working under Contractor. To the maximum
extent permitted by law, Contractor’s duty to defend shall apply whether or not such claims,
allegations, lawsuits, or proceedings have merit or are meritless; or which involve claims or
allegations that any of the parties to be defended were actively, passively, or concurrently
negligent; or which otherwise assert that the parties to be defended are responsible, in whole
or in part, for any loss, damage, or injury. Contractor agrees to provide this defense
immediately upon written notice from OC San, and with well qualified, adequately insured, and
experienced legal counsel acceptable to OC San. This section shall survive the expiration or
early termination of the Contract.
15. Independent Contractor. The relationship between the Parties hereto is that of an
independent contractor and nothing herein shall be deemed to make Contractor an OC San
employee. During the performance of this Contract, Contractor and its officers, employees,
and agents shall act in an independent capacity and shall not act as OC San’s officers,
employees, or agents. Contractor and its officers, employees, and agents shall obtain no rights
to any benefits which accrue to OC San’s employees.
16. Subcontracting and Assignment. Contractor shall not delegate any duties nor assign any
rights under this Contract without the prior written consent of OC San. Any such attempted
delegation or assignment shall be void.
17. Disclosure. Contractor agrees not to disclose, to any third party, data or information
generated from this Contract without the prior written consent from OC San.
18. Non-Liability of OC San Officers and Employees. No officer or employee of OC San shall
be personally liable to Contractor, or any successor-in-interest, in the event of any default or
breach by OC San, or for any amount which may become due to Contractor or to its successor,
or for breach of any obligation under the terms of this Contract.
19. Third-Party Rights. Nothing in this Contract shall be construed to give any rights or benefits
to anyone other than OC San and Contractor.
20. Applicable Laws and Regulations. Contractor shall comply with all applicable Federal, State,
and local laws, rules, and regulations. Contractor also agrees to indemnify and hold OC San
harmless from any and all damages and liabilities assessed against OC San as a result of
Contractor’s noncompliance therewith. Any provision required by law to be included herein
shall be deemed included as a part of this Contract whether or not specifically included or
referenced.
21. Licenses, Permits, Ordinances, and Regulations. Contractor represents and warrants to
OC San that it has obtained all licenses, permits, qualifications, and approvals of whatever
nature that are legally required to provide the Services. Any and all fees required by Federal,
Services Contract 7 of 11 Specification No. S-2026-720BD
Revision 121924
State, County, City, and/or municipal laws, codes, and/or tariffs that pertain to the work
performed under this Contract will be paid by Contractor.
22. Regulatory Requirements. Contractor shall perform all work under this Contract in strict
conformance with applicable Federal, State, and local regulatory requirements including, but
not limited to, 40 CFR 122, 123, 124, 257, 258, 260, 261, and 503, Title 22, 23, and Water
Codes Division 2.
23. Environmental Compliance. Contractor shall, at its own cost and expense, comply with all
Federal, State, and local environmental laws, regulations, and policies which apply to
Contractor, its subcontractors, and the Services, including, but not limited to, all applicable
Federal, State, and local air pollution control laws and regulations.
24. South Coast Air Quality Management District’s Requirements. It is Contractor’s
responsibility to ensure that all equipment furnished and installed be in accordance with the
latest rules and regulations of the South Coast Air Quality Management District (SCAQMD).
All Contract work practices, which may have associated emissions such as sandblasting, open
field spray painting, or demolition of asbestos containing components or structures shall
comply with the appropriate rules and regulations of SCAQMD.
25. California Air Resources Board Mobile Source Regulations. Contractor and its applicable
consultants, subconsultants, and subcontractors shall comply with the following California Air
Resources Board Mobile Source Regulations:
• Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6
• Truck & Bus Regulation (T&B): 13 CCR 2025
• Clean Truck Check (CTC): 13 CCR 2195-2199.1
• Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2
26. California Voluntary Protection Program Annual Reporting Requirement. If Contractor
will potentially work 1,000 combined hours in a quarter, for the term of the Agreement,
Contractor shall provide an annual report detailing its safety and health information, including,
but not limited to, its total number of employees, work hours, number of injuries and illnesses,
and number of injury and illness cases involving days away from work, restricted work activity
and/or job transfer. Contractor shall furnish this report to OC San no later than January 20th
each calendar year.
Failure to provide this data by the required due date may result in suspension of Contractor’s
services with OC San. Any delay arising out of or resulting from such suspension shall be
Contractor’s sole responsibility and considered Contractor caused delay, which shall not be
compensable by OC San.
27. Warranties. In addition to the warranties stated in Exhibit “A,” the following shall apply:
27.1 Manufacturer’s standard warranty shall apply. All manufacturer warranties shall
commence on the date of acceptance of the work as complete by the OC San Project
Manager or designee.
27.2 Contractor’s Warranty (Guarantee): If within a one (1) year period of completion of all
work specified in Exhibit “A,” OC San informs Contractor that any portion of the Services
provided fails to meet the standards required under this Contract, Contractor shall, within
the time agreed to by OC San and Contractor, take all such actions as are necessary to
Services Contract 8 of 11 Specification No. S-2026-720BD
Revision 121924
correct or complete the noted deficiency(ies) at Contractor's sole expense.
28. Dispute Resolution.
28.1 In the event of a dispute as to the construction or interpretation of this Contract, or any
rights or obligations hereunder, the Parties shall first attempt, in good faith, to resolve the
dispute by mediation. The Parties shall mutually select a mediator to facilitate the
resolution of the dispute. If the Parties are unable to agree on a mediator, the mediation
shall be conducted in accordance with the Commercial Mediation Rules of the American
Arbitration Agreement, through the alternate dispute resolution procedures of Judicial
Arbitration through Mediation Services of Orange County (“JAMS”), or any similar
organization or entity conducting an alternate dispute resolution process.
28.2 In the event the Parties are unable to timely resolve the dispute through mediation, the
issues in dispute shall be submitted to arbitration pursuant to Code of Civil Procedure,
Part 3, Title 9, sections 1280 et seq. For such purpose, an agreed arbitrator shall be
selected, or in the absence of agreement, each party shall select an arbitrator, and those
two (2) arbitrators shall select a third. Discovery may be conducted in connection with
the arbitration proceeding pursuant to Code of Civil Procedure section 1283.05. The
arbitrator, or three (3) arbitrators acting as a board, shall take such evidence and make
such investigation as deemed appropriate and shall render a written decision on the
matter in question. The arbitrator shall decide each and every dispute in accordance with
the laws of the State of California. The arbitrator’s decision and award shall be subject
to review for errors of fact or law in the Superior Court for the County of Orange, with a
right of appeal from any judgment issued therein.
29. Liquidated Damages. Not Used.
30. Remedies. In addition to other remedies available in law or equity, if Contractor fails to make
delivery of the goods and Services or repudiates its obligations under this Contract, or if OC
San rejects the goods or Services or revokes acceptance of the goods and Services, OC San
may (a) cancel the Contract; (b) recover whatever amount of the purchase price OC San has
paid, and/or (c) “cover” by purchasing, or contracting to purchase, substitute goods and
Services for those due from Contractor. In the event OC San elects to “cover” as described in
(c), OC San shall be entitled to recover from Contractor as damages the difference between
the cost of the substitute goods and Services and the Contract price, together with any
incidental or consequential damages.
31. Force Majeure. Neither party shall be liable for delays caused by accident, flood, acts of God,
fire, labor trouble, war, acts of government, or any other cause beyond its control, but the
affected party shall use reasonable efforts to minimize the extent of the delay. Work affected
by a force majeure condition may be rescheduled by mutual consent of the Parties.
32. Termination.
32.1 OC San reserves the right to terminate this Contract for its convenience, with or without
cause, in whole or in part, at any time, by written notice from OC San. Upon receipt of a
termination notice, Contractor shall immediately discontinue all work under this Contract
(unless the notice directs otherwise). OC San shall thereafter, within thirty (30) days, pay
Contractor for work performed (cost and fee) through the date of termination. Contractor
expressly waives any claim to receive anticipated profits to be earned during the
uncompleted portion of this Contract. Such notice of termination shall terminate this
Services Contract 9 of 11 Specification No. S-2026-720BD
Revision 121924
Contract and release OC San from any further fee, cost, or claim hereunder by Contractor
other than for work performed through the date of termination.
32.2 OC San reserves the right to terminate this Contract immediately upon OC San’s
determination that Contractor is not complying with the Scope of Work requirements, if
the level of service is inadequate, or for any other default of this Contract.
32.3 OC San may also immediately terminate this Contract for default, in whole or in part, by
written notice to Contractor:
▪ if Contractor becomes insolvent or files a petition under the Bankruptcy Act; or
▪ if Contractor sells its business; or
▪ if Contractor breaches any of the terms of this Contract; or
▪ if the total amount of compensation exceeds the amount authorized under this
Contract.
32.4 All OC San’s property in the possession or control of Contractor shall be returned by
Contractor to OC San on demand or at the expiration or early termination of this Contract,
whichever occurs first.
33. Attorney’s Fees. If any action at law or in equity or if any proceeding in the form of an
Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this
Contract, the prevailing party shall be entitled to reasonable attorney’s fees, costs, and
necessary disbursements in addition to any other relief to which the prevailing party may be
entitled.
34. Waiver. The waiver by either party of any breach or violation of, or default under, any provision
of this Contract shall not be deemed a continuing waiver by such party of any other provision
or of any subsequent breach or violation of this Contract or default thereunder. Any breach by
Contractor to which OC San does not object shall not operate as a waiver of OC San’s rights
to seek remedies available to it for any subsequent breach.
35. Severability. If any section, subsection, or provision of this Contract; or any agreement or
instrument contemplated hereby; or the application of such section, subsection, or provision is
held invalid, the remainder of this Contract or instrument in the application of such section,
subsection, or provision to persons or circumstances other than those to which it is held invalid,
shall not be affected thereby, unless the effect of such invalidity shall be to substantially
frustrate the expectations of the Parties.
36. Survival. The provisions of this Contract dealing with payment, warranty, indemnity, and forum
for enforcement shall survive expiration or early termination of this Contract.
37. Governing Law. This Contract shall be governed by and interpreted under the laws of the
State of California and the Parties submit to jurisdiction in the County of Orange in the event
any action is brought in connection with this Contract or the performance thereof.
38. Notices.
38.1 All notices under this Contract must be in writing. Written notice shall be delivered by
personal service, by electronic telecommunication, or sent by registered or certified mail,
postage prepaid, return receipt requested, or by any other overnight delivery service
which delivers to the noticed destination and provides proof of delivery to the sender.
Services Contract 10 of 11 Specification No. S-2026-720BD
Revision 121924
Rejection or other refusal to accept or the inability to deliver because of changed address
for which no notice was given as provided hereunder shall be deemed to be receipt of
the notice, demand, or request sent. All notices shall be effective when first received at
the following addresses:
OC San: Donald Herrera
Senior Buyer
Orange County Sanitation District
18480 Bandilier Circle
Fountain Valley, CA 92708
dherrera@ocsan.gov
Contractor: Don Jamison
President
Jamison Engineering
2525 S. Yale Street
Santa Ana, CA 92704
jamisoneng@msn.com
38.2 Each party shall provide the other party written notice of any change in address as soon
as practicable.
39. Read and Understood. By signing this Contract, Contractor represents that it has read and
understood the terms and conditions of the Contract.
40. Authority to Execute. The persons executing this Contract on behalf of the Parties warrant
that they are duly authorized to execute this Contract and that by executing this Contract, the
Parties are formally bound.
41. Entire Agreement. This Contract constitutes the entire agreement of the Parties and
supersedes all prior written or oral communications and all contemporaneous oral agreements,
understandings, and negotiations between the Parties with respect to the subject matter
hereof.
[Intentionally left blank. Signatures follow on the next page.]
Services Contract 11 of 11 Specification No. S-2026-720BD
Revision 121924
IN WITNESS WHEREOF, intending to be legally bound, the Parties hereto have caused this
Contract to be signed by their duly authorized representatives.
ORANGE COUNTY SANITATION DISTRICT
Dated: _________________ By:
Christine Marick
Vice-Chairwoman, Board of Directors
Dated: _________________ By:
Kelly A. Lore
Clerk of the Board
Dated: _________________ By:
Kevin Work
Purchasing & Contracts Manager
Jamison Engineering Contractors, Inc.
Dated: _________________ By:
Print Name and Title of Officer
DH
EXHIBIT A Specification No. S-2026-720BD
EXHIBIT A SCOPE OF WORK
For On-Call Condition Assessment Program Support Services
EXHIBIT A
SCOPE OF WORK
ON-CALL CONDITION ASSESSMENT PROGRAM SUPPORT SERVICES
SPECIFICATION NO. S-2026-720BD
TABLE OF CONTENTS
I. ORGANIZATIONAL INFORMATION .......................................................................... 3
II. SUMMARY .................................................................................................................. 3
III. BACKGROUND, PROJECT DESCRIPTION, AND PROJECT ELEMENTS .............. 4
A. BACKGROUND ............................................................................................................... 4
B. GENERAL PROJECT DESCRIPTION ............................................................................. 4
C. PROJECT ELEMENTS .................................................................................................... 6
I. PROJECT ELEMENT 1 – CONFINED SPACE ENTRY SUPPORT WITH SCBA, SUPPLIED
AIR, OR DRAGER BG-4 RE-BREATHER APPARATUS ................................................. 6
II. PROJECT ELEMENT 2 – CONFINED SPACE ENTRY SUPPORT (NON SCBA) ................ 7
III. PROJECT ELEMENT 3 – FORCED AIR VENTILATION ................................................... 7
IV. PROJECT ELEMENT 4 – WATER JETTING – PIPE CLEANING....................................... 7
V. PROJECT ELEMENT 5 – DEWATERING AND BY-PASS PUMPING ................................. 7
VI. PROJECT ELEMENT 6 – DEBRIS, GRIT, AND RAG REMOVAL ...................................... 7
VII. PROJECT ELEMENT 7 – CLOSED CIRCUIT TELEVISION (CCTV) SURVEYS .................. 8
VIII. PROJECT ELEMENT 8 – REPAIR OF PIPELINE LINER AND COATING SYSTEMS ............. 8
IX. PROJECT ELEMENT 9 – INCIDENTAL REPAIRS .......................................................... 8
X. PROJECT ELEMENT 10 – EXCAVATION AND SHORING ............................................... 9
XI. PROJECT ELEMENT 11 – CATHODIC PROTECTION INSTALLATION .............................. 9
IV. PROJECT MANAGEMENT ........................................................................................ 9
A. PROJECT SCHEDULE .................................................................................................... 9
B. PROJECT SUPPORTS .................................................................................................. 10
C. CONSTRUCTION AND INSTALLATION SERVICES ..................................................... 10
D. WORK HOURS/NOISE REQUIREMENTS ..................................................................... 10
V. SAFETY AND HEALTH REQUIREMENTS .............................................................. 10
A. INJURY AND ILLNESS PREVENTION PROGRAM ....................................................... 11
B. CONTRACTOR SAFETY ORIENTATION ...................................................................... 11
C. JOB SAFETY ANALYSIS (JSA) .................................................................................... 11
D. LOCKOUT TAGOUT (LOTO) ......................................................................................... 11
E. CONFINED SPACE ENTRY (CSE) AND RESCUE ........................................................ 11
F. FALL PROTECTION ...................................................................................................... 12
G. HOT WORK ................................................................................................................... 12
EXHIBIT A 2 of 13 Specification No. S-2026-720BD
H. CHEMICAL SAFETY ...................................................................................................... 12
I. TRAINING RECORDS ................................................................................................... 12
VI. TRAFFIC CONTROL ................................................................................................ 12
VII. SPILL REPORTING AND HANDLING ................................................................ 13
VIII. RESEALING MANHOLE AND VAULT COVERS ............................................... 13
IX. FOCUS MEETINGS AND DRY RUNS ...................................................................... 13
X. MANAGEMENT OF SUBCONTRACTORS AND SUB-CONSULTANTS ................. 13
XI. REQUEST FOR CORROSION ASSESSMENT SUPPORT ...................................... 13
I. ORGANIZATIONAL INFORMATION
Orange County Sanitation District (OC San) is a governmental agency responsible
for wastewater treatment for metropolitan Orange County, California. It has been
in existence since 1954 and is the third-largest wastewater treatment agency west
of the Mississippi River. OC San’s Plant 1 is located at 10844 Ellis Avenue,
Fountain Valley, and Plant 2 is located at 22212 Brookhurst Street, Huntington
Beach.
II. SUMMARY
This scope of work is for on-call Contractor support services for assessments and
incidental repairs of OC San’s assets, including plant pipelines, sewers, manholes,
wet wells, tunnels, and other structures to be determined by OC San staff. The
Contractor shall provide all personnel and equipment as needed to support OC
San staff in their assessment and incidental repairs of OC San assets, including
performing ancillary tasks such as cleaning and debris removal to perform the
assessments and to carry out incidental repairs as directed by OC San staff.
Required services include, but are not limited to the following:
• Confined space entry support, including provision of personnel and of all
associated essential equipment for safe entry/exit, rescue personnel and
equipment, preparation of safety plans in accordance with OC San
requirements, focus meetings, shutdown dry runs, and coordinating lockout
tagout (LOTO) procedures. As these entries include live sewers or exposure to
potentially Immediately Dangerous to Life and Health (IDLH) environments,
Contractor and Subcontractor will be required to provide and use Self-
Contained Breathing Apparatus (SCBA) or Supplied Air Respirators (SAR),
equipped with emergency escape bottles. Rescue personnel and support
equipment shall be provided for all confined space entries, and all rescue
teams shall be certified to comply with California Occupational Safety and
Health Administration (OSHA) requirements.
• Forced-air ventilation
• Water jetting
• Dewatering or by-pass pumping
• Debris, grit, and rag removal prior to assessments
• Incidental repairs
• Closed Circuit TV (CCTV) support and CCTV production
• Rebar Locating
• Concrete core samples collection and Testing
• Concrete repairs after core sample removal
• Cathodic Protection Installation
• Ground Penetrating Radar
• Repairs to existing T-Lock® Arrow-Lock® or other types of liners and coatings,
and other incidental repairs as directed by OC San.
EXHIBIT A 4 of 13 Specification No. S-2026-720BD
• Traffic control to facilitate assessments.
The Contractor shall at all times provide services to ensure compliance with all
applicable regulatory requirements and OC San’s standards. The Contractor shall
contract with qualified and approved specialist consultants for the provision of
specific services to include concrete core analysis, structural engineering
evaluation, Non-Destructive Evaluation (NDE), and cathodic protection system
surveys as needed to augment the directly provided services.
III. BACKGROUND, PROJECT DESCRIPTION, AND PROJECT ELEMENTS
A. BACKGROUND
In other industries, corrosion engineering and corrosion control design, as it
relates to pipelines, process piping, and storage and treatment facilities, have
experienced different levels of implementation depending on the risk of failure
and consequence of failure. Hazardous materials such as fuel oil and natural
gas have a mandate from the United States Department of Transportation
(DOT), as implemented by the California Public Utilities Commission (CPUC),
calling for corrosion monitoring and assessment on a regular basis. As a result,
these industries have proactive corrosion control programs and in-house
corrosion departments.
Corrosion engineering in the water and wastewater industries varies by
municipality. Generally, economic and environmental factors have been the
motivation for corrosion control, ranging from fix it as it leaks (reactive) to
proactive programs of inspection/assessment followed by coatings, linings, and
external cathodic protection. In the 1980s, East Bay Municipal Utility District
demonstrated that investment into a proactive corrosion control and monitoring
program resulted in savings of $15 to every $1 allocated to corrosion control.
OC San has constructed several new facilities for expansion since the first
facilities began operation in 1954. Excavating facilities for repair or
replacement due to corrosion requires an enormous effort and high cost.
Regulations have been changing infrastructure management. In response to
these factors, OC San has elected to support a proactive maintenance
program. One (1) element of this proactive approach is to conduct internal
assessments of piping and associated facilities to determine their current
condition and use this information to make recommendations for their future
maintenance and operation.
B. GENERAL PROJECT DESCRIPTION
The purpose of this contract is to provide OC San with on-call contractor
support services so that OC San can carry out assessments of selected
facilities, structures, pipelines, and other assets to evaluate their current
condition. In addition, perform maintenance repairs as directed by OC San.
The shutdowns, flow diversions, assessments, and all other tasks will be
scheduled by OC San personnel.
The level of Contractor support will vary for each structure or asset to be
assessed, depending upon the specific facility and the planned level of
EXHIBIT A 5 of 13 Specification No. S-2026-720BD
assessment that is either desired or is practical. In all instances, the
assessments will be directed by OC San personnel and not by the Contractor.
The Contractor shall provide the required support for each assessment task as
determined on a case-by-case basis. All subcontractors shall be approved by
OC San prior to performing any services under this contract.
The level of contractor support for incidental repairs will be dependent upon the
specific task. In all instances, the repairs will be directed by OC San personnel
and not by the Contractor.
For each task, OC San will prepare a “Request for Assessment
Support/Incidental Repairs” that includes a scope of work, schedule, work
duration, and a not-to-exceed amount for the services to be provided by the
Contractor.
Upon OC San’s request, the Contractor shall provide input into or prepare a
work plan or means and methods plan to optimize the assessment/incidental
repair process. This may involve preliminary meetings and job walks with OC
San staff to finalize the support requirements to perform the required corrosion
assessments.
The Contractor shall provide the following services:
• Confined space entry support for permit-required confined spaces, including
but not limited to provision of SCBA/SAR equipment, rescue equipment
(e.g., davits, winches, harnesses, tripods, SRLs), rescue team, ventilation
equipment, communication equipment, and atmospheric monitoring
equipment.
• Provision of 3,000 psi water-jetting equipment with up to 300 feet of
associated hoses and trained operators to adequately water jet as needed
before CCTV inspection and physical assessment by OC San.
• Provision of submersible or grade-mounted pumps of appropriate rating and
capacity to dewater the identified structures for internal Corrosion
assessment by OC San. This will include installation and removal of all
required bypass piping and associated fittings.
• Debris and rag removal using vacuum excavation equipment, like a Vactor
truck or other approved equipment, prior to physical or CCTV assessments.
• Provision of CCTV services and required support in compliance with OC
San standards.
• Provision of a trailer-mounted welding machine.
• Provision of as-needed incidental repairs.
• Provision of concrete rebar locating, core drilling equipment, and drill bits
for core sampling.
• Cathodic Protection Installation
• Repair of existing Ameron T-Lock® liner or other lining and coatings by
qualified and experienced personnel.
EXHIBIT A 6 of 13 Specification No. S-2026-720BD
The Contractor’s staff must be able to communicate in English both orally
and in writing with OC San staff as well as with other members of their
crew. The Contractor’s staff shall demonstrate the capability to read,
interpret, and understand the Safety/OSHA requirements, OC San’s plans,
drawings, and specifications, as necessary. All work and equipment utilized
shall conform to Cal OSHA Title 8 requirements, including, but not limited
to, work performed in confined spaces and/or gas-hazardous environments.
C. REQUEST FOR CORROSION ASSESSMENT SUPPORT
For each new assessment support task, OC San will prepare and issue a
“Request for Assessment Support/Incidental Repair” to the Contractor. Each
Task Order for assessments shall not exceed $250,000, and each task order
for incidental repairs shall not exceed $99,999.
D. PROJECT ELEMENTS
The Project will be divided into Project Elements with each having their own
unit rates (see Exhibit B). For any given assessment, the Contractor will be
required to supply all manpower and equipment to provide for a combination of
Project Elements as determined by OC San to meet the needs of the individual
assessments.
i. PROJECT ELEMENT 1 – CONFINED SPACE ENTRY SUPPORT WITH SCBA, SUPPLIED
AIR, OR DRAGER BG-4 RE-BREATHER APPARATUS
• Confined space entry support for permit-required confined spaces, including
but not limited to provision of SCBA/SAR equipment, rescue equipment
(e.g., davits, winches, harnesses, tripods, SRLs), rescue team, ventilation
equipment, communication equipment, and atmospheric monitoring
equipment. Contractor personnel shall be trained in confined space entry
and rescue, including confined space entry supervisor, entrant, attendant,
and rescuer. The Contractor shall prepare all safety plans, confined space
entry procedures, rescue plans, and coordinate LOTO with OC San staff for
each assessment. The Contractor's rescue team shall be provided for all
confined space entries. The rescue team shall be trained and certified in
accordance with the Cal/OSHA requirements. All entry support staff shall be
trained, experienced, and certified in the use and operation of SCBA, SAR,
fall protection, ventilation, and atmospheric monitoring equipment. All entry
support staff shall be trained and experienced in providing communications
systems for entrants in often long-line live sewers where line-of-sight
communications are not possible. Experience to include the use of bone
mike-radio systems, hard-wire communications, air horns, and other
technologies or means to provide adequate communications during
assessments. Forced-air ventilation equipment, including fans, venturis,
ducting, and portable generators as needed to permit, where practical, non-
SCBA entry for the OC San assessment engineers and Contractor’s
support crews.
EXHIBIT A 7 of 13 Specification No. S-2026-720BD
ii. PROJECT ELEMENT 2 – CONFINED SPACE ENTRY SUPPORT (NON SCBA)
Confined space entry and support for OC San staff entry to include confined
space entry supervisor, attendant, entrant, rescue personnel, entry and exit
equipment, monitoring equipment and all standard safety equipment
(including but not limited to all PPE, tripods, winches, harnesses, fall
restraint lanyards and ropes), Self-Contained-Self-Rescue (SCSR) Re-
breathers (Ocenco EBA 6.5) and communications systems to perform the
required assessments. The Contractor’s entry supervisor shall prepare the
required safety plans with OC San Safety staff and coordinate LOTO with
OC San personnel for each assessment.
iii. PROJECT ELEMENT 3 – FORCED AIR VENTILATION
Provision of forced-air ventilation equipment, including fans, venturis,
ducting, electrical cords, and portable generators with Ground Fault Circuit
interrupters (GFCIs) as needed to permit entry into the assets for OC San
and Contractor’s staff. Contractor shall provide suitably rated ventilation
fans, associated equipment, and support personnel from local
subcontractors as required and as directed by the OC San Project
Engineer.
iv. PROJECT ELEMENT 4 – WATER JETTING – PIPE CLEANING
The Contractor shall provide water jetting equipment rated at 3,000 PSI,
with a minimum of 300 feet of associated hoses and trained operators to
adequately clean surfaces prior to inspection and physical assessment by
OC San staff. All water, power generation, and removal of jet water with
contained debris to be performed by the Contractor. All extracted material
shall be disposed of at OC San’s Plant No. 1. Contractor shall provide or
subcontract higher-pressure water jetting equipment if required by OC San
staff and invoiced per Exhibit B.
v. PROJECT ELEMENT 5 – DEWATERING AND BY-PASS PUMPING
Where required, the Contractor is to provide suitably sized and rated pumps
with all ancillary power supply, piping, and fittings to dewater an identified
structure or pipe section or to bypass an asset to facilitate entry for physical
or CCTV assessment. The Contractor shall work closely with OC San staff
to optimize all dewatering and bypass piping operations to utilize available
equipment and to meet OC San’s operational requirements. The pump
selection and piping requirements will vary significantly between tasks. The
Contractor shall provide a two-inch, submersible pump complete with 200
feet of associated hoses and AC power generation (with GFCIs) as part of
the standard equipment on their ‘Combo” trucks. Contractor shall also
provide three-inch, four-inch, and six-inch pumps as directed by OC San
staff. Larger pumps (and associated equipment) shall be rented from
specialist vendors as directed by OC San staff.
vi. PROJECT ELEMENT 6 – DEBRIS, GRIT, AND RAG REMOVAL
Provide extraction or removal services for debris, grit, and rags from assets
prior to assessment or CCTV inspection using vacuum excavators (e.g.,
Vactor Truck) or other approved equipment. The Contractor shall provide all
labor and equipment to remove debris, grit, and rags that would impede or
EXHIBIT A 8 of 13 Specification No. S-2026-720BD
prevent the required assessment. All extracted material shall be disposed of
within OC San’s Plant No. 1 or as directed by OC San staff. Where special
circumstances are encountered, such as very high volumes, in excess of
two feet deep of debris and rags within a structure, the Contractor shall
work with OC San to develop a location-specific plan for the debris removal
process and for specialist subcontract services to be provided.
vii. PROJECT ELEMENT 7 – CLOSED CIRCUIT TELEVISION (CCTV) SURVEYS
Provision of CCTV inspection services shall be in compliance with OC San
standards.
Contractor shall furnish all labor, materials, equipment, and incidentals
necessary for the video inspection of various lengths and sizes of sanitary
sewers located in the treatment plants and throughout Orange County.
Sewers will be cleaned sufficiently by the Contractor for the camera to pass
through the pipe. All CCTV operators shall be National Association of
Sewer Service Companies (NASSCO) certified.
A color video recording on a USB Drive will be made of the inspection and
submitted to OC San's representative(s), along with the required Inspection
Report. The Inspection Report will include a description, pictures, and the
location of the defects.
viii. PROJECT ELEMENT 8 – REPAIR OF PIPELINE LINER AND COATING SYSTEMS
Repair of the Ameron T-Lock® pipeline liner or other liner materials shall be
performed by experienced personnel. All repairs to T-Lock® liners shall be
in full compliance with OC San master specification section 06620 - Plastic
Liner (Polyvinyl Chloride) and 09800 – Protective Coating. Repairs to all
other pipeline liners and coating systems shall be in compliance with OC
San’s master specifications and procedures. The OC San master
specifications are available upon request at OC San’s Plant No.1. This
scope of work includes the provision of all T-Lock® or Arrow-Lock® repair
materials or other pipe-liner and coating repair materials and equipment as
needed. All confined space entry support for the liner repairs shall be as
indicated for Project Elements 1 or 2 above, as applicable.
ix. PROJECT ELEMENT 9 – INCIDENTAL REPAIRS
Perform incidental repairs to OC San assets during the course of condition
assessments. Incidental repairs may be performed on components that
have failed or are likely to fail within the next 2 to 5 years, and such failure
could cause a disruption to the level of service, or the asset will experience
a significant loss of structural integrity. Incidental repairs may be warranted
during the condition assessment to avoid duplication of setup and difficult or
high-risk operational conditions. The cost of the incidental repairs
performed during a condition assessment task shall not exceed $99,999.
The Contractor shall keep a running total of all billings and expenses so that
the cost of the incidental repairs for an individual task does not surpass the
not to exceed amount. OC San will not exceed this figure.
The repairs may include, but not be limited to, abrasive blasting/ultra-high
pressure water blasting; coating and lining application and repair; concrete
crack injection; repair of concrete and steel structures; replacement of wear
EXHIBIT A 9 of 13 Specification No. S-2026-720BD
items; mechanical repairs; machining; replacement of valves, repairs to
gates, piping, and drains; and welding.
x. PROJECT ELEMENT 10 – EXCAVATION AND SHORING
Perform excavation for any underground assets external assessment as
directed by OC San. Any excavation shall be performed as per OC San
master specification 02200- Earth work, and provide shoring, if applicable,
as per OC San master specification 02210 – Excavation Support and
Protection. After assessment and incidental repairs are completed, the
Contractor shall backfill the excavated site as per OC San's applicable
master specifications and as directed by OC San.
xi. PROJECT ELEMENT 11 – CATHODIC PROTECTION INSTALLATION
The Contractor shall perform Cathodic Protection (CP) installation on OC
San assets during the course of this contract. CP installation may include
CP test station, Sacrificial Anodes, Impressed Current Anodes, Permanent
Reference cells, Cables, Cable to Pipe (metal) connections using thermit
welding and pin brazing method, Transformer and Rectifier (TR) installation
as directed by OC San. All CP installations shall be performed under the
supervision of NACE/AMPP-certified personnel. All CP installations shall be
as per OC San master specification 13110- Corrosion Control and other
applicable master specifications and OC San CP standard drawings.
The cathodic protection installation may include testing and commissioning
of the cathodic protection installation by NACE/AMPP-certified personnel.
IV. PROJECT MANAGEMENT
The assessment project shall be managed by OC San staff. However, the
Contractor shall manage all support tasks, including equipment supply, provision
of manpower, and other directly supplied or subcontracted services as detailed,
and shall keep OC San apprised of the status of the support effort for each
instance.
The Contractor shall provide the key management and supervisory personnel as
described in their proposal on this contract. The Contractor shall not reassign the
key project personnel without prior approval of OC San. OC San may request re-
assignment of any of the Contractor’s (or subcontractor’s) personnel.
The Contractor shall be responsible for the supervision and management of all
subcontractors.
A. SCHEDULING AND WORK HOURS
Because the on-call Contractor support is for assessments and incidental
repairs, a detailed project schedule is not applicable. However, the Contractor
shall provide the anticipated levels of support as indicated in Project Elements I
through 11 inclusive over the entire contract period. OC San staff will
coordinate the planned shutdowns, assessments, and incidental repairs with
the Contractor and with OC San operations to ensure that all required
resources are available for each task.
For each task, OC San will prepare and issue to the Contractor a “Request for
Assessment Support/Incidental Repair” that includes a scope of work,
EXHIBIT A 10 of 13 Specification No. S-2026-720BD
schedule, work duration, and a not-to-exceed amount for the services to be
provided.
The Contractor shall respond to OC San task requests within two (2) calendar
days. Delays in responses may be cause for cancellation of the contract.
This contract may require the Contractor to work schedules outside of the
normal OC San business hours. Normal business hours are considered 7:00
a.m. to 4:30 pm. Night work is common, and weekend hours may also be
necessary due to low flow conditions during these periods.
Emergency assessment support: In the case of an emergency, the Contractor
shall provide assessment/incidental repairs support within four (4) hours of
notice from OC San.
B. PROJECT SUPPORTS
All OC San Assessment/Incidental repairs projects are divided into six (6)
phases. Contractor shall provide support services for Project Elements for the
following Phases:
Phase 1 – Pre-Assessment Planning
Phase 2 – Pre-Assessment Support to OC San O &M Team
Phase 3 – Assessment
Phase 4 – Incidental Repairs
Phase 5 – Post Assessment Support to OC San O & M Team
Phase 6 – Assessment Findings Documentation
C. CONSTRUCTION AND INSTALLATION SERVICES
Construction and installation services shall be provided by the Contractor on an
“as needed” basis to support the corrosion assessments by OC San and
perform incidental repairs over the duration of this contract.
D. NOISE REQUIREMENTS
When working outside of the property limits of OC San Plant 1 or Plant 2,
specific work hours and nighttime schedules may be imposed by the California
Department of Transportation (CALTRANS), local cities, the County of Orange,
or whoever has jurisdiction. The Contractor is required to work within those
hours of operation and to provide necessary equipment to meet local noise
restrictions that may be imposed.
V. SAFETY AND HEALTH REQUIREMENTS
The Contractor and any subcontractors shall comply with all applicable
provisions of the OC San Safety Standards, Federal OSHA, California OSHA,
and local regulations, whichever is most stringent.
EXHIBIT A 11 of 13 Specification No. S-2026-720BD
A. INJURY AND ILLNESS PREVENTION PROGRAM
The Contractor shall prepare and submit a written Injury and Illness Prevention
Program (IIPP). The IIPP must address responsibility, compliance,
communication, hazard assessment, incident investigation, hazard correction,
and training as required by Title 8, California Code of Regulations, Section
3203. The Contractor shall also prepare and submit safety programs where
required by Cal OSHA. These programs may include fall protection, lockout
tagout, confined space entry, and hazard communication. The safety plan must
be specific to the work being completed and approved prior to the start of work
(including mobilization).
B. CONTRACTOR SAFETY ORIENTATION
The Contractor shall attend a Contractor Safety Orientation (CSO) meeting
prior to the start of work. The CSO is an OC San safety orientation conducted
between OC San’s Risk Management Division (safety and health) and the
Contractor. The CSO is conducted once per year or when job conditions or the
scope of work change. The Contractor shall participate in these meetings by
providing work plans and other requested safety deliverables described below.
C. JOB SAFETY ANALYSIS (JSA)
The Contractor shall prepare Job Safety Analyses for work tasks completed by
the Contractor. The JSA is a procedure where each basic step of the work task
has identified hazards and recommended controls for the safest way to
complete the work task.
D. LOCKOUT TAGOUT (LOTO)
The Contractor shall participate in the OC San LOTO process. OC San will
isolate the structure and associated systems prior to Contractor entry into the
structure. OC San will prepare a written energy control procedure for the
structure. OC San will demonstrate that hazardous energy has been controlled
by walking each isolation point and reviewing the energy control procedure with
the Contractor. The Contractor shall apply their own lock and tag to the OC
San lock box upon acceptance and sign the energy control procedure. Each
Contractor and subcontractor employee working in the structure must apply
their own lock and tag.
E. CONFINED SPACE ENTRY (CSE) AND RESCUE
The Contractor shall assume the work area will be in an area classified as a
PRCS. The Contractor shall prepare a PRCS Entry Permit, Entry Procedure,
and Rescue Plan that describes all procedures, equipment, and methods
proposed to be used. A dedicated Rescue Team is required. Calling 911 or
relying on the local fire department for rescue is not acceptable. A ventilation
plan is required to be developed by qualified personnel and implemented
during any entry into the structure. The Contractor shall monitor the
atmosphere during entry for oxygen, carbon monoxide, flammable gases, and
hydrogen sulfide. The Contractor should not assume that any OC San owned
EXHIBIT A 12 of 13 Specification No. S-2026-720BD
equipment is available for Contractor use. All safety support shall be provided
for OC San Inspectors or Engineers at the Contractor’s expense. The
Contractor shall assume all work areas are classified as a Permit-Required
Confined Space (PRCS). The Contractor is required to have a copy of its
current confined space entry permit at every job site at all times. The OC San
inspector or Engineer may shut down the job site at no additional cost to OC
San if the permit is not available upon request. While isolation is provided, the
Contractor should assume there will be a potential exposure to wastewater. OC
San Risk Management will review the submitted Entry Permit, Entry
Procedures, Rescue Plan, and Ventilation Plan. If accepted, OC San Risk
Management will issue the Contractor a Confined Space JHA authorizing the
Contractor for such entry.
F. FALL PROTECTION
Fall protection shall be provided around all openings to protect Contractor
employees and OC San. Fall protection at openings shall consist of a portable
guardrail or other suitable barrier to prevent persons from falling to a lower
level. Fall protection will be required for personnel when using Contractor
provided extension ladders when accessing the structures. Fall protection will
be required when working at heights greater than four feet.
If scaffolding is required, the scaffolding system shall be designed by a scaffold
qualified person and erected, inspected, and dismantled by a scaffold
competent person. The scaffolding shall be supplied by a qualified,
experienced scaffolding company. Contractor shall submit scaffold plans prior
to use and must be approved by OC San.
G. HOT WORK
Any activity producing spark, flame, or heat will require an OC San issued hot
work permit. The Contractor, depending on the activity, will be required to
provide appropriate controls in accordance with OC San’s hot work program.
These controls may include a fire watch, a 20-pound fire extinguisher, fire
blankets, and an atmospheric monitor.
H. CHEMICAL SAFETY
All chemicals brought onsite shall be accompanied by a safety data sheet
(SDS). The Contractor must store and use those chemicals in accordance with
the SDS and manufacturer's instructions.
I. TRAINING RECORDS
Contractor shall submit copies of its employee training records to Risk
Management for retention.
VI. TRAFFIC CONTROL
All traffic control on public rights of way shall be in accordance with the latest
CALTRANS Manual of Traffic Control. Additional local regulations shall have
precedence. Safe and adequate pedestrian and vehicular access shall be
provided in accordance with the latest Standard Specifications for Public Works
EXHIBIT A 13 of 13 Specification No. S-2026-720BD
Construction. For work within OC San facilities, traffic control requirements as
determined by OC San shall apply.
Contractor shall prepare or purchase traffic control plans, apply for all traffic
control permits, and pay all fees and permits for said permits as directed by OC
San staff, and shall invoice per the attached Cost Proposal Form.
Note: Inadequate or improper signing and delineation for traffic control may be
cause for the cancellation of the contract.
VII. SPILL REPORTING AND HANDLING
In the event of any Contractor-related overflow or interruption/ backup of customer
service, the Contractor shall immediately notify the OC San Control Center at
Plant No. 1 via phone at (714) 593-7025, and shall contain and eliminate the
overflow.
Workshops with the contractor’s staff may be provided by OC San regarding
containment methods.
Contractor shall be responsible for any fines levied by others, reimbursement of
any agency incurred costs, damage, cleanup, restoration of flow, and any
disruption of service costs to customers as a result of the Contractor’s work. This
is in addition to any costs incurred by customers.
Contractor shall also notify the OC San Control Center immediately of any
apparent non-Contractor-related spills and/or any abnormal conditions.
VIII. RESEALING MANHOLE and VAULT COVERS
Contractor shall reseal all manholes and vaults opened during the course of the
contract that were previously sealed with Calpico #CD-5 duct seal or equal, within
24 hours after work is completed or as directed by OC San staff. Work area
around the manhole covers shall be swept clean of all debris after completion of all
work at that location.
IX. FOCUS MEETINGS AND DRY RUNS
The Contractor shall prepare for and oversee a focus meeting and a dry run prior
to each shutdown and corrosion assessment/incidental repair as directed by OC
San staff. The focus meetings and dry runs will serve to share information, discuss
technical issues, understand time constraints, receive and resolve comments,
obtain decisions, and receive direction from OC San. These actions shall insure
that potential problems can be anticipated and either avoided or minimized. In
addition, these activities will identify any specific equipment or spare parts required
on site prior to the shutdown and subsequent work, so that delays are minimized
or avoided.
X. MANAGEMENT OF SUBCONTRACTORS and SUB-CONSULTANTS
The Contractor shall be responsible for and shall manage the activities of all
subcontractors and subconsultants utilized under this scope of work.
OPERATIONS COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5012 Agenda Date:7/22/2026 Agenda Item No:8.
FROM:Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering
SUBJECT:
REDHILL RELIEF SEWER RELOCATION AT STATE ROUTE 55, PROJECT NO. FE18-13
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Approve the Second Amendment to Utility Agreement No.OCSD-1005,between the Orange County
Sanitation District and the Orange County Transportation Authority,for final reimbursement amount of
$4,996,443 for Project No.FE18-13,Redhill Relief Sewer Relocation at State Route 55,in the City of
Santa Ana.
BACKGROUND
The Orange County Transportation Authority (OCTA)is currently widening State Route 55 (SR-55)
between Interstate 5 and Interstate 405.The Orange County Sanitation District (OC San)owns a
sewer crossing beneath SR-55 immediately south of Warner Avenue in the City of Santa Ana.
OC San executed Project No.FE18-13,Redhill Relief Sewer Relocation at State Route 55,to extend
the required protective casing for the sewer and relocated a manhole out of the widened right of way.
OCTA first agreed to reimburse OC San for the cost of this work in a March 2020 Utility Agreement
between the agencies.
RELEVANT STANDARDS
·Maintain collaborative and cooperative relationships with regulators,stakeholders,and
neighboring communities
·Protect OC San assets
PROBLEM
In November 2022,OCTA paused the mobilization of OC San’s contractor due to Southern California
Edison’s (SCE’s)design and construction procurement delays to relocate their interfering electrical
utility line.SCE completed their construction,allowing OC San’s contractor to mobilize after July
2024.A few days after mobilizing in October 2024,OC San’s contractor discovered two utilities that
were in direct conflict with the new sewer alignment.One was a Caltrans electrical line that was
relocated quickly upon discovery and the second consisted of a Verizon fiber communication cable
that had to be relocated.Both were not anticipated to be in conflict based on existing utility
Orange County Sanitation District Printed on 7/13/2026Page 1 of 3
powered by Legistar™
File #:2026-5012 Agenda Date:7/22/2026 Agenda Item No:8.
that had to be relocated.Both were not anticipated to be in conflict based on existing utility
information. OCTA agreed to reimburse OC San for associated costs.
PROPOSED SOLUTION
Approve the Second and Final Amendment to the Utility Agreement increasing the Utility Agreement’s
reimbursable from $2,840,000 to $4,996,443. OCTA has accepted the final upper limit.
TIMING CONCERNS
OC San needs to revise the Utility Agreement with OCTA in order to be compensated for the
additional costs.
RAMIFICATIONS OF NOT TAKING ACTION
OC San will not be reimbursed for the additional costs.
PRIOR COMMITTEE/BOARD ACTIONS
March 2025 -Approved a construction contingency increase of $531,120 (24%)to the existing
Construction Contract with SRK Engineering,Inc.for Redhill Relief Sewer Relocation at State Route
55,Project No.FE18 13,for a total contract amount not to exceed $2,213,000 and a new total
construction contingency of $1,327,800 (60%),with all costs to be reimbursed by the Orange County
Transportation Authority.
July 2024 -Approved a construction contingency increase of $464,730 (21%)to the existing
construction contract with SRK Engineering,Inc.for Redhill Relief Sewer Relocation at State Route
55,Project FE18-13,for a total contract amount not to exceed $2,213,000 and a total construction
contingency of $796,680 (36%),with all costs to be reimbursed by the Orange County Transportation
Authority.
June 2022 -Received and filed Bid Tabulation and Recommendation for Redhill Relief Sewer
Relocation at State Route 55,Project No.FE18-13;awarded a Construction Contract to SRK
Engineering,Inc.for Redhill Relief Sewer Relocation at State Route 55,Project No.FE18-13 for an
amount not to exceed $2,213,000; and approved a contingency of $331,950 (15%).
September 2021 -Approved the First Amendment to Utility Agreement No.OCSD-1005,between the
Orange County Sanitation District and the Orange County Transportation Authority agreeing to a
funding increase for the relocation and protection of the Redhill Relief Sewer at State Route 55 in the
City of Santa Ana.
March 2020 -Approved Utility Agreement No.OCSD-1005 between the Orange County Sanitation
District and the Orange County Transportation Authority agreeing to specific terms,conditions,and
funding obligations regarding the relocation and protection of the Redhill Relief Sewer at State Route
55 in the City of Santa Ana.
Orange County Sanitation District Printed on 7/13/2026Page 2 of 3
powered by Legistar™
File #:2026-5012 Agenda Date:7/22/2026 Agenda Item No:8.
ADDITIONAL INFORMATION
Utility Agreement No.OCSD-1005 cites Section 703 of the Streets and Highways Code declaring OC
San’s Redhill Relief Sewer Relocation at State Route 55 project qualifies for full reimbursement at
OCTA’s expense.The agreement obligates OC San to submit a final bill to OCTA within 360 days of
the completion of the relocation for the remaining balance of OC San’s relocation costs.
CEQA
The Caltrans/OCTA SR-55 Improvement Project includes the relocation and protection of the Redhill
Relief Sewer in their Initial Study/Mitigated Negative Declaration/Environmental Assessment.
Unrelated to the Caltrans/OCTA Improvement Project is an OC San repair project,which is exempt
from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations
section 15301.A Notice of Exemption was filed in June 2022 with the OC Clerk-Recorder after the
OC San's Board of Directors approval of the Construction Contract.
FINANCIAL CONSIDERATIONS
This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has
been budgeted (Budget Update FY 2025-26,Page A-8,Small Construction Projects Program,Project
No. M-FE) and the budget is sufficient for the recommended action.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Second Amendment to Utility Agreement No. OCSD-1005
·First Amendment to Utility Agreement No. OCSD-1005
·Utility Agreement No. OCSD-1005
RD:lb
Orange County Sanitation District Printed on 7/13/2026Page 3 of 3
powered by Legistar™
ORANGE COUNTY TRANSPORTATION AUTHORITY Page 1 of 2
SECOND AMENDMENT TO UTILITY AGREEMENT NO. OCSD-1005
13-EX-24 (REV 1/2014)
District County Route Post Mile Project ID No. EA
0J340 12 Orange SR-55 6.4 / 10.2 1200020328
STPLN-6071 (129)
Federal Aid No.:
Plan #-OCSD-1005
Owner’s File No.:
FEDERAL PARTICIPATION: On the Project ☒ Yes ☐ No
On the Utilities ☒ Yes ☐ No
SECOND AMENDMENT TO UTILITY AGREEMENT NO. OCSD-1005
WHEREAS, the Orange County Transportation Authority, hereinafter called OCTA, and
Orange County Sanitation District, hereinafter called OWNER, have entered into that certain
Utility Agreement No. OCSD-1005, dated April 7, 2020, and a First Amendment on
November 10, 2021, which Agreement sets forth the terms and conditions pursuant to which
OWNER has performed relocation of its facilities to accommodate OCTA’s construction
project on Route 55, Project No. 1200020328/EA 0J340; and,
WHEREAS, in the performance of said work, increased costs over and above those estimated
at the time of the execution of said Agreement were incurred due to the fact that: a) additional
permitting costs due to Caltrans and City requested revisions; b) increased design and
construction support costs as a result of unrecorded utility conflicts encountered during
construction; c) change orders for Southern California Edison and Verizon delays; d)
additional costs for a Verizon relocation in conflict with OWNER’s alignment; e) increased
labor, construction, and material costs due to the COVID-19 pandemic; and f) an extended
construction timeline as a result of the above-mentioned delays; and,
WHEREAS, it has been determined that, since costs have overrun the amount shown in
said Agreement by 248.18% ($3,561,443 increase), and when the increased cost exceeds
by 25% the estimated amount set forth in said Agreement, said Agreement shall be
amended to show the increased cost of the work to OCTA; and,
WHEREAS, the estimated cost to OCTA of the work to be performed under said Agreement
was $1,435,000.00, and by reason of the increased costs referred to above, the amended
estimated cost to OCTA is $4,996,443.00.
NOW, THEREFORE, it is agreed between the parties as follows:
1. The estimated cost to OCTA of $1,435,000.00 as set forth in the Agreement is hereby
amended to read $4,996,443.00.
2. All other terms and conditions of said Agreement remain unchanged.
SECOND AMENDMENT TO UTILITY AGREEMENT NO. OCSD-1005 (Cont.) Page 2 of 2
IN WITNESS WHEREOF, the parties hereto have executed this Second Amendment to
Utility Agreement No. OCSD-1005 this day of , 2026.
OWNER:
ORANGE COUNTY SANITATION
DISTRICT
ORANGE COUNTY TRANSPORTATION
AUTHORITY,
a public entity
APPROVED APPROVED
By: By:
Date: Date:
James G. Beil, P.E.
Executive Director,
Capital Programs
APPROVED AS TO FORM:
Alston & Bird, LLP
APPROVED AS TO FORM:
By: By:
James M. Donich
General Counsel
ATTEST:
Date:
Kelly A. Lore, MMC
Clerk of the Board
___________________________________
Scott C. SmithGeneral Counsel
Christine Marick
Board Vice-Chairwoman
ORANGE COUNTY TRANSPORTATION AUTHORITY
FIRST AMENDMENT TO UTILITY AGREEMENT NO.OCSD-1005
Page 1of2
13-EX-24 (REV 1/2014)
District Countv Route Post Mile Proiect ID No.EA
12 Orange SR-55 6.4/10.2 1200020328 0J340
Federal Aid No.:STPLN-6071 (129)
Owner's File:Plan #-0CSD-1005
FEDERAL PARTICIPATION:On the Project M Yes No
On the Utilities S Yes No
FIRST AMENDMENT TO UTILITY AGREEMENT NO.OCSD-1005
WHEREAS,Orange County Transportation Authority,hereinafter called OCTA,whose address is 550 South
IVIain Street,Orange,California 92863-1584,and Orange County Sanitation District,hereinafter called
OWNER,have entered into that certain Utility Agreement No.OCSD-1005,dated April 7,2020,which
Agreement sets forth the terms and conditions pursuant towhich OWNER has been performing final design
and relocation workto accommodate SR-55 Improvement Project No.1200020328/EA 0J340; and,
WHEREAS,in the performance of said work,increased costs of $1,405,000.00 over and above those
estimated at the timeof the execution of said Agreement were incurred due to revisions made to the original,
conceptual sewerdesign along with theadditional associated design work andconstruction costs in connection
therewith;and,
WHEREAS,it has been determined that,since costs have overrun the amount shown in said Agreement by
97.91 %,and when the increased cost exceeds by25%the estimated amountset forth in said Agreement,said
Agreement shallbe amended to show the increased cost ofthe work to OCTA;and,
WHEREAS,the estimated cost to OCTA of the work to be performed under said Agreement was
$1,435,000.00,and by reason ofthe increased costs referred toabove,the amendedestimated cost to OCTA
is $2,840,000.00.
NOW,THEREFORE, the PARTIESagree to amend the AGREEMENTas follows:
1.The estimated cost to OCTA of $1,435,000.00 as set forth in the AGREEMENTis hereby amended to read
$2,840,000.00.
2. Allother terms and conditions of the AGREEMENT remain unchanged.
LEGAL02/4095070lv3
ORANGE COUNTY TRANSPORTATION AUTHORITY PagplofS
UnLII-y AGKEBMENT
RW 13^)5 (K1£V12/2016)
UlSlKICI
12
COUNTY
Orange
ROUTE
SR-55
POSTMILE
6,4/10.?
Project ID
1200020328
EA 0J340.
federalAID NUMBER
STPLN-6071 (129)
OWN
ocs
ER'S PLAN NUMBER
D-1005
On the project IE!yes no On the Utilities IE!yes no
UTILITY AGREEMENT NO.OCSD-1005 DATE
Pursuant to Cooperative Agreement Number C-7-1936 (Cooperative Agreement),the Orange County
Transportation Authority (OCTA)is partnering with the California Department of Transportation (Caltrans) in a
project that proposes to widen State Route 55 (SR-55)between Interstate 405 and Interstate 5 (SR-55
ImprovementProject).Per the Cooperative Agreement,OCTA Is the lead agency for Right of Way Acquisition
and UtiBty.The SR-55 ImprovementProject proposes to reduce traffic congestion,wnprove mobility as wellas
trafficoperations to an existing four mile stretch of SR-55.
Orange County Sanitation District (OCSD)
10844 BlisAvenue
Fountain Valley, CA92708
Hereinafterrefierred to as "OWNER",owns and maintains sewer fiaciMes in the CityofSanta Anawithin the limits
of OCTA'sprojectwhich requires project development,deagn,inspection, project management,relocation of a
manhole and sewer segments and the extension of casing to accommodate OCTA's project,and provision of
necessary easement interests as set forth in Section V below.
It is hereby mutually agreed that
I.WORKTO BE DONE
In accordance with Notice to Owner No.OCSD-1005 dated February 13,2020,OWNER shall
relocate sewer manhole and extend casing.All work shall be performed substantially m
acconlance withOWNER'SPlan No.OCSI>-1005 dated February 13,2020consisting of 1 sheet,
a copy of which is on file in the OCTA office at 550 S. Main Street;Orange,CA 92863-1584.
Deviations from the OWNER'S plan described above initiated by either the OCTA or the OWNER,
shall be agreed upon by both parties hereto under a Revised Notice to Owner.Such Revised
Notices to Owner,approved by the OCTA and agreed to/acknowledged by the OWNER,will
constitute an approved revision of tiie OWNER'S plan described above and are hereby made a
part hereof.No work under said deviation shall commence prior to written execution by the
OWNER of the Revised Notice to Owner.Changes in the scope of the work will require an
amendment to tiiis Agreement in addition to the revised Notice to Owner.
II.UABILITY FOR WORK
ADA Noticc Pot individualswithsensorydisabilities,this documcnl is available inalternate formats. Por alternateformal
information, contact the Forms Management Unit at (916)445-1233,TTY 711,or write to Records and Forms
Management,1120 N Street,MS-89,Sacramento,CA 95814.
UjCAI.02fl94927IIvI
LnGAL02fl96l7270vl
OPERATIONS COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5013 Agenda Date:7/22/2026 Agenda Item No:9.
FROM:Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering
SUBJECT:
SUPPLEMENTAL ENGINEERING SERVICES, CONTRACT NO. PSA2026-001
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve Professional Services Agreements to provide Supplemental Engineering Services,
Contract No. PSA2026-001, for a three-year period with two one-year renewal options
effective October 1, 2026, for a combined total amount not to exceed $55,800,000, initially
allocated as follows:
·AECOM Technical Services, Inc. - $27,900,000
·Jacobs Project Management Co. - $27,900,000; and
B. Authorize the General Manager to transfer funds between the two Professional Services
Agreements, as needed, to align contract budgets with actual workload distribution, with no
increase to the total Board-authorized amount.
BACKGROUND
Orange County Sanitation District (OC San)delivers a Capital Improvement Program (CIP)and
complex repair projects that require project management,project engineering,resident engineering,
inspection, construction support, and specialized technical services.
Since 2002,OC San has used Supplemental Engineering Services (SES)agreements to support CIP
and small project delivery.Typical SES roles include project managers,project engineers,electrical
engineers,resident engineers,and inspection staff.The largest need is for construction support
roles,including resident engineers and inspectors.OC San also uses SES for specialty roles that
are not maintained by staff, such as structural engineering and specialized rehabilitation work.
In April 2022,the Board approved SES agreements with AECOM Technical Services,Inc.and
Jacobs Project Management Co.,for a three-year period with two one-year renewal options.In
December 2025,the Board authorized the General Manager to transfer funds between those
agreements to balance contract budgets through April 2027 with no increase to the total Board-
authorized amount.
In 2025,OC San completed an Engineering Department Staffing Plan in response to the FY 2025-26
Orange County Sanitation District Printed on 7/13/2026Page 1 of 4
powered by Legistar™
File #:2026-5013 Agenda Date:7/22/2026 Agenda Item No:9.
In 2025,OC San completed an Engineering Department Staffing Plan in response to the FY 2025-26
General Manager’s Work Plan goal to minimize SES,improve succession planning,and streamline
the project delivery process.The plan shifts long-term support positions from supplemental contract
staffing to OC San full-time positions over a four-year period through the normal budget process.
During the transition period between October 1,2026 and April 30,2027 both SES contracts will be
effective. The new contracts provide for new subconsultants.
RELEVANT STANDARDS
·Comply with California Government Code Section 4526 to engage the best qualified firm “on
the basis of demonstrated competence and qualifications”and “negotiate fair and reasonable
fees”
·Ensure the public’s money is wisely spent
·Sustain 1, 5, and 20-year planning horizons
PROBLEM
OC San’s staffing requirements for the CIP workload exceed the Engineering Department’s current
and future staff capacity.Although the Engineering Department Staffing Plan will reduce reliance on
SES over time,OC San still needs supplemental resources to maintain project delivery,provide long-
term construction support,address workload peaks,fill temporary vacancies,and provide specialty
expertise not maintained by staff.
OC San also needs flexibility to manage the distribution of work between the two selected firms.
Assignment volume will vary based on project needs,staff availability,and each firm’s ability to
provide qualified resources.
PROPOSED SOLUTION
Approve two Professional Services Agreements to provide Supplemental Engineering Services and
authorize the General Manager to transfer funds between the agreements,as needed,without
increasing the total Board-authorized amount.
When OC San identifies a project or specialty support need,the two firms will be requested to
propose qualified staff.OC San will select the most appropriate resource or team for each
assignment and either authorize the staff to fill the staff role or negotiate the budget and schedule for
the task.
The General Manager’s authority to transfer funds between the two agreements will allow OC San to
balance contract capacity based on actual utilization and the availability of qualified staff from each
firm. This authority will not increase the total Board-authorized amount.
Staff will continue to provide quarterly reports to the Board of Directors on the utilization of the SES
contracts through Engineering’s Contracts Performance Report.
Orange County Sanitation District Printed on 7/13/2026Page 2 of 4
powered by Legistar™
File #:2026-5013 Agenda Date:7/22/2026 Agenda Item No:9.
TIMING CONCERNS
Awarding these agreements in July 2026 will help to retain existing SES staffing as the existing
agreements expire.Delaying approval could create resource gaps while new OC San positions are
phased in and the CIP continues.
RAMIFICATIONS OF NOT TAKING ACTION
Without these supplemental engineering resources,OC San may need to delay projects or
separately procure specialty services as needs arise,resulting in project delays and additional
administrative costs.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
Consultant Selection:
OC San advertised and requested proposals for Supplemental Engineering Services,Contract No.
PSA2026-001,on January 28,2026.The following evaluation criteria were described in the Request
for Proposals and used to determine the most qualified consultants.
CRITERION WEIGHT
Project Understanding and Approach 35%
Related Project Experience 30%
Project Team and Staff Qualifications 35%
Three proposals were received on March 9,2026,and evaluated in accordance with the evaluation
process set forth in OC San’s Purchasing Ordinance by a pre-selected Evaluation Committee
consisting of OC San staff:three Engineering Managers.The Evaluation Committee also included
one non-voting representative from the Contracts Administration Division.
The Evaluation Committee scored the proposals on the established criteria as summarized in the
table below:
Firm Approach
(Max 35)
Related
Experience
(Max 30)
Team
(Max 35)
Total Score
(Max 100)
1 Jacobs Project
Management Co.
34 29 32 95
2 AECOM Technical
Services, Inc.
27 23 28 78
3 Hazen and Sawyer 25 20 25 70
Based on the proposal scoring,Jacobs Project Management Co.and AECOM Technical Services,
Inc.,were ranked as the two most qualified firms.The Evaluation Committee determined interviews
were not necessary and selected Jacobs Project Management Co.,and AECOM Technical Services,
Orange County Sanitation District Printed on 7/13/2026Page 3 of 4
powered by Legistar™
File #:2026-5013 Agenda Date:7/22/2026 Agenda Item No:9.
were not necessary and selected Jacobs Project Management Co.,and AECOM Technical Services,
Inc., as the most qualified consultants.
Jacobs Project Management Co.demonstrated qualified staff resources,familiarity with OC San’s
project delivery needs,and leadership that supports continuity.AECOM Technical Services,Inc.,
demonstrated a structured approach,a deep bench of staff,experience providing supplemental staff
to other public agencies,and dedicated field staff supervision.Together,the two firms provide
qualified resources to support OC San’s ongoing project delivery needs.
Review of Fee Proposal and Negotiations:
Proposals were accompanied by sealed fee proposals.In accordance with OC San’s Purchasing
Ordinance,the fee proposals of only the two highest-ranked firms were opened after approval by the
Director of Engineering of the Evaluation Committee’s recommendation.
Staff negotiated final contract terms with Jacobs Project Management Co.,and AECOM Technical
Services,Inc.,including fringe and overhead rates and applicable contract terms.Based on the
above,staff has determined that the final negotiated terms are fair and reasonable and recommends
award of the Professional Services Agreements to Jacobs Project Management Co.and AECOM
Technical Services, Inc.
Contract Value:
The agreements will provide services through task authorizations,task directives,and program role
assignments.OC San will authorize specific work only as services are needed.The initial amount
for each agreement is $27,900,000,with a not to exceed amount of $55,800,000.The General
Manager may transfer funds between the agreements as needed,with no increase to the total Board-
authorized amount.
CEQA
N/A
FINANCIAL CONSIDERATIONS
This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has
been budgeted (Budget FY 2026-27 and FY 2027-28).Costs will be charged to approved project
budgets.The authority to transfer funds between agreements will not increase the total Board-
authorized amount.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Professional Services Agreements
·Presentation
MD:lb
Orange County Sanitation District Printed on 7/13/2026Page 4 of 4
powered by Legistar™
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 1 of 20
PROFESSIONAL SERVICES AGREEMENT
This PROFESSIONAL SERVICES AGREEMENT, (hereinafter referred to as “Agreement”), is made and entered into to be effective the 1st day of October, 2026, by and between the ORANGE COUNTY SANITATION DISTRICT, (hereinafter referred to as "OC SAN"),
and AECOM Technical Services, Inc., (hereinafter referred to as "CONSULTANT"). OC SAN and CONSULTANT are referred to herein collectively as the "Parties" or individually as a "Party." WITNESSETH: WHEREAS, OC SAN desires to engage CONSULTANT for Supplemental Engineering Services, PSA2026-001, to provide qualified staff as described in Attachment “A”, Scope of Work; and Attachment “A1”, Rules of Engagement; and WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the requisite personnel and experience, and is capable of performing such services; and WHEREAS, OC SAN has adopted procedures for the selection of professional services
and has proceeded in accordance with said procedures to select CONSULTANT to perform this work; and
WHEREAS, OC SAN shall manage selection of a Consultant for Task Order(s) when requested after award of this Agreement based on the most appropriate qualifications and fit; and WHEREAS, at its regular meeting on July 22, 2026, the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee to approve this Agreement. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows:
1. SCOPE OF WORK
CONSULTANT agrees to furnish necessary professional services to accomplish the Scope of Work attached hereto as Attachment “A", and is hereby incorporated into this Agreement. In the event of a conflict between the Scope of Work and this Agreement, the terms of this Agreement shall prevail.
2. COMPENSATION Total compensation shall be paid to CONSULTANT for the services in accordance with
the following provisions:
A. Time and Material: Not to Exceed Aggregate Amount OC SAN shall compensate CONSULTANT for services performed under this Agreement on a time and materials basis, not to exceed a maximum aggregate amount of Twenty-Seven Million Nine Hundred Thousand Dollars ($27,900,000) (“Total Compensation”) during the term of the Agreement.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 2 of 20
B. Hourly Rates
As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus benefits, overhead, and profit) actually paid by CONSULTANT charged on an
hourly-rate basis to this project and paid to the personnel of CONSULTANT as set forth in Attachment “E” (attached hereto and incorporated herein by reference). OC SAN shall also pay to CONSULTANT a sum equal to the premium costs for overtime, charged on an hourly-rate basis, actually paid by CONSULTANT to the non-exempt personnel of CONSULTANT plus profit. Premium costs for overtime will not include fringe and overhead. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this Agreement.
C. Overhead i. “Field Office Staff” are defined as project-assigned staff by CONSULTANT,
working at OC SAN’s facilities for a project-assigned period exceeding ninety (90) continuous calendar days. The overhead rates for Field Office Staff are included in Attachment “E”.
ii. “Home Office Staff” are defined as staff assigned by CONSULTANT, supporting the project-assigned work, either by working at CONSULTANT’s
or Subconsultant’s offices or at OC SAN’s site for periods less than ninety (90) continuous calendar days. The overhead rates for Home Office Staff are included in Attachment “E”.
D. Profit Profit for CONSULTANT and Subconsultants shall be five percent (5%). Addenda shall be governed by the same maximum Profit percentage. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this Agreement.
E. Subconsultants
For all Subconsultants, CONSULTANT may pay to Subconsultants total compensation on an hourly-rate basis per Attachment “E” - Fee Proposal and as
specified in the Scope of Work. OC SAN shall pay to CONSULTANT the actual costs of Subconsultants, without markup.
F. Reimbursable Direct Costs
OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this Agreement (attached hereto and incorporated herein by reference). The reimbursement of the above-mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 3 of 20
and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service
Administration website at https://www.gsa.gov/travel/plan-book/per-diem-rates. Reimbursement. The CONSULTANT shall be responsible for the most
economical and practical means or management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical. Returns. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN. Travel and travel arrangements. Any travel involving airfare, overnight stays or multiple day attendance must be approved by OC SAN in advance. Local Travel. Local Travel is considered travel by the CONSULTANT within OC SAN geographical area which includes Orange, Los Angeles, Ventura, San
Bernardino, Riverside, San Diego, Imperial, and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel.
Lodging. Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the
discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN. Travel Meals. Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals. Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this Agreement.
Actual Costs. OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN.
OC SAN will not pay per diem for Field Office Staff nor will it pay for any relocation of staff to be assigned under this Agreement.
G. Limitation of Costs
If, at any time, CONSULTANT estimates the cost of performing the services described in CONSULTANT’s Task Authorizations will exceed seventy-five percent (75%) of the not-to-exceed amount of the Task Authorization, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 4 of 20
Any cost incurred in excess of the approved not-to-exceed amount, without the express written consent of OC SAN’s authorized representative shall be at
CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s invoice and monthly progress report. Failure to notify OC SAN that the services
cannot be completed within the authorized not-to-exceed amount is a material breach of this Agreement.
3. REALLOCATION OF TOTAL COMPENSATION
OC SAN shall have the right to approve a reallocation of the incremental amounts constituting the Total Compensation, provided that the Total Compensation is not increased.
4. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period, in a format acceptable to OC SAN. CONSULTANT shall warrant and certify the accuracy of these costs and provide all support documentation required by OC SAN. CONSULTANT understands that submitted costs are subject to Section 16 Audit Provisions.
B. Upon receipt of a properly prepared invoice, as described above, payment shall
be made by OC SAN to CONSULTANT within sixty (60) calendar days.
C. Upon satisfactory completion of the work performed hereunder and prior to final payment under this Agreement for such work, or prior settlement upon
termination of this Agreement, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this Agreement other than such claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein.
D. Pursuant to the California False Claims Act (Government Code sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this Agreement may be held liable for treble damages and up to a $10,000 civil penalty for each false claim submitted. This section shall also be binding on all Subconsultants.
A CONSULTANT or Subconsultant shall be deemed to have submitted a false
claim when the CONSULTANT or Subconsultant: (a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be
made or used a false record or statement to get a false claim paid or approved by OC SAN; (c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; (d) knowingly makes, uses, or causes to be made or used a
false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or (e) is a beneficiary of an inadvertent submission of a false claim to OC SAN,
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 5 of 20
and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim.
5. TERM
This Agreement shall commence upon the effective date first written above, and shall continue in full force and effect through September 30, 2029, (Initial Term) unless earlier
terminated or extended as provided in the Agreement.
OC SAN, at its sole discretion, may elect to extend the term of this Agreement up to an additional twelve (12) months, commencing October 1, 2029, and continuing through
September 30, 2030, (Option Term 1), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A” and Attachment “A1”.
OC SAN, at its sole discretion, may elect to extend the term of this Agreement up to an additional twelve (12) months, commencing October 1, 2030, and continuing through September 30, 2031, (Option Term 2), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A” and Attachment “A1”.
OC SAN’s election to extend the Agreement beyond the Initial Term shall not diminish its right to terminate the Agreement for OC SAN’s convenience or CONSULTANT’s default as provided elsewhere in this Agreement. The “maximum term” of this Agreement shall
be from the effective date first written above through September 30, 2031, which period encompasses the Initial Term and two (2) Option Terms.
6. PREVAILING WAGES
A. To the extent CONSULTANT intends to utilize employees who will perform work during the Agreement, as more specifically defined under Labor Code Section 1720, CONSULTANT shall be subject to prevailing wage requirements with
respect to such employees.
7. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES
A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration
requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section 1771.4, the work is subject to compliance monitoring and enforcement by the DIR.
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 6 of 20
Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776.
C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the
Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations.
D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e).
8. CONFLICT OF INTEREST CODE
OC SAN may designate some or all of the individuals performing services under the Agreement as “designated positions” subject to OC SAN’s Conflict of Interest Code. CONSULTANT employees or Subconsultants acting in these designated positions must comply with certain requirements under the Political Reform Act. CONSULTANT employees or Subconsultants acting in these designated positions must file an annual report identifying some or all of their financial interests such as sources of income, sources of gifts received from special sources of income and sources of gifts. Currently the limit is $630 per year from any one source. CONSULTANT and all its employees,
staff, or personnel assigned to an OC SAN designated position shall comply with the Political Reform Act and related reporting requirements and gift limitation.
9. INDEPENDENT CONTRACTOR
The CONSULTANT and Subconsultants shall be independent contractors and not agents or employees of OC SAN. Any provisions of this Agreement that may appear to give OC SAN the right to direct the CONSULTANT concerning the details of performing the professional services, or to exercise any control over such performance, shall mean only that the CONSULTANT shall follow the direction of OC SAN concerning the end results of the performance.
10. DOCUMENT OWNERSHIP – CONSULTANT PERFORMANCE
A. Ownership of Documents for the professional services performed.
All documents in all forms (electronic, paper, etc.), including, but not limited to, studies, sketches, drawings, computer printouts, disk files, and electronic copies prepared in connection with or related to the Scope of Work or professional
services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed.
OC SAN ownership entitlement arises upon payment or any partial payment for work performed and includes ownership of any and all work product completed prior to that payment. This Section shall apply whether the CONSULTANT’s
professional services are terminated: a) by the completion of the Agreement, or b) in accordance with other provisions of this Agreement. Notwithstanding any
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 7 of 20
other provision of this paragraph or Agreement, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer
printouts and disk files, and specifications. OC SAN acknowledges that documents prepared through professional services must be revised and sealed by a professional engineer prior to their reuse on another project. OC SAN
acknowledges that it assumes all risk associated with reuse of such documents, which are not undertaken by CONSULTANT.
B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the study or deliverable where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service rendered by CONSULTANT was not a proximate cause of the damage.
11. INSURANCE A. General i. Insurance shall be issued and underwritten by insurance companies
acceptable to OC SAN. ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial
Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Workers’
Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent. iii. Coverage shall be in effect prior to the commencement of any work under this Agreement. B. General Liability
The CONSULTANT shall maintain during the life of this Agreement, including the period of warranty, commercial general liability insurance written on an
occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000) aggregate. If aggregate limits apply separately to this Agreement (as evidenced
by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: premises-operations, blanket contractual liability (for this Agreement), products liability/completed operations (including any product manufactured or assembled), broad form property damage, blanket contractual liability, independent contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 8 of 20
accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground)
and Riggers/On Hook Liability must be included in the general liability policy and coverage must be reflected on the submitted certificate of insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by
subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor, or subcontractor performing work or rendering services on behalf of OC SAN in connection with the planning, development, and construction of the project. In all its insurance coverages related to the work, CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their officers, agents, or employees, or any other consultant, contractor, or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its
Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance
premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged.
C. Automobile/Vehicle Liability Insurance The CONSULTANT shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: combined single limit of One Million Dollars ($1,000,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement. D. Umbrella Excess Liability
The minimum limits of general liability and automobile liability insurance required, as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess coverage.
Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automobile liability.
E. Workers’ Compensation Insurance The CONSULTANT shall provide such workers’ compensation insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including employer’s liability insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such workers’ compensation insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 9 of 20
Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may
exist, the insurance required herein shall include coverage for Jones Act claims. F. Errors and Omissions/Professional Liability
CONSULTANT shall maintain in full force and effect, throughout the term of this Agreement, standard industry form professional liability / errors and omissions insurance coverage with coverage limits of not less than Five Million Dollars ($5,000,000) in accordance with the provisions of this paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of five (5) years from the date of the completion of the services hereunder. In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of
CONSULTANT during the course of performing services under the terms of this Agreement. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the present or
new carrier. In the event the present policy of insurance is written on an “occurrence” basis,
said policy shall be continued in full force and effect during the term of this Agreement or until completion of the services provided for in this Agreement, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts or omissions of CONSULTANT during the course of performing services under the terms of this Agreement. CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term.
G. Drone Liability Insurance
If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of One Million Dollars ($1,000,000) in a form acceptable by OC SAN.
H. Proof of Coverage The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before work commences. OC SAN reserves the right to require, at any time, complete, certified copies of all required insurance policies, including endorsements, effecting the coverage required. The following are approved forms that must be submitted as proof of coverage:
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 10 of 20
•insurance form
• (General Liability) CG 20 10 and CG 20 37 All other additional insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN.
• (Automobile Liability) OC SAN approval.
•subrogation endorsement provided by carrier for OC SAN approval.
• Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC SAN of any pending or actual insurance policy
cancellation, as described in Article I. Cancellation and Policy Change Notice, below.
I. Cancellation and Policy Change Notice
The CONSULTANT is required to notify OC SAN in writing of any insurance
cancellation notice it receives or other knowledge of pending or actual insurance
policy cancellation within two (2) working days of receipt of such notice or
acquisition of such knowledge. Additionally, the CONSULTANT is required to
notify OC SAN in writing of any change in the terms of insurance, including
reduction in coverage or increase in deductible/SIR, within two (2) working days
of receipt of such notice or knowledge of same.
Said notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT
18480 Bandilier Circle
Fountain Valley, CA 92708
Attention: Contracts, Purchasing & Materials Management Division
J. Primary Insurance The general and automobile liability policies shall contain a “Primary and Non-
Contributory” clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 11 of 20
K. Separation of Insured
The general and automobile liability policies shall contain a “Separation of Insureds” clause.
L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this Agreement, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property. M. Deductibles and Self-Insured Retentions Any deductible and/or self-insured retention must be declared to OC SAN on the
certificate of insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the
CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses.
N. Defense Costs The general and automobile liability policies shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits. O. Subconsultants The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in
amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work.
P. Limits Are Minimums If the CONSULTANT maintains higher limits than any minimums shown above,
then OC SAN requires and shall be entitled to coverage for the higher limits maintained by CONSULTANT.
12. KEY POSITIONS
CONSULTANT shall notify OC SAN in advance changes to any key CONSULTANT employees or Subconsultants performing services under this Agreement. Positions considered to be Key Positions are Point of Contact, and any field office staff working under the Agreement. Should a CONSULTANT employee or Subconsultant within one of these categories become no longer available to OC SAN, CONSULTANT shall submit
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 12 of 20
the resume and qualifications of the proposed replacement to OC SAN for approval as soon as possible, but in no event later than seven (7) calendar days prior to the
departure of the incumbent Key Position unless CONSULTANT is not provided with such notice by the departing staff.
13. SCOPE CHANGES
In the event of a change in the Scope of Work or a change in Key Personnel or change in hourly rates as requested by OC SAN, the Parties hereto shall execute an Amendment to this Agreement setting forth with particularity all terms of the new Agreement. CONSULTANT’s compensation for additional services authorized and performed in accordance with this Agreement shall be agreed to by the Parties in writing prior to the time that the additional services are authorized. CONSULTANT hereby agrees to use any and all procedures, programs, and systems required by OC SAN to process and execute such Amendment(s), including, but not limited to, computer programs and systems.
14. PROJECT TEAM AND SUBCONSULTANTS
Neither this Agreement nor any interest herein nor claim hereunder may be assigned by
CONSULTANT either voluntarily or by operation of law, nor may all or any part of the Agreement be subcontracted by CONSULTANT, without the prior written consent of OC SAN. Consent by OC SAN shall not be deemed to relieve CONSULTANT of its
obligation to comply fully with all terms and conditions of this Agreement.
CONSULTANT shall provide to OC SAN, prior to execution of this Agreement, the names and full description of all Subconsultants and CONSULTANT’s project team
members anticipated to be used under this Agreement by CONSULTANT. CONSULTANT shall include a description of the work and services to be done by each Subconsultant and each of CONSULTANT’s team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant, broken down as indicated in Section 2- COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT’s team members without prior written approval by OC SAN.
15. ENGINEERING REGISTRATION
The CONSULTANT's personnel and Subconsultants are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered engineer but represents and agrees that wherever, in the performance
of this Agreement, the services of a registered engineer is required, such services hereunder will be performed under the direct supervision of registered engineers who are registered in California.
16. AUDIT PROVISIONS
A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents, and any other evidence of procedures and
practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this Agreement.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 13 of 20
The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all
Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records,
documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this Agreement during the term of this Agreement and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15 days
after receipt of notice from OC SAN. Upon OC SAN’s request, the CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified employee of the
CONSULTANT will be available to assist OC SAN’s auditor in obtaining all accounting records and documents, and any other financial data related to this Agreement.
17. LEGAL RELATIONSHIP BETWEEN PARTIES
The legal relationship between the Parties hereto is that of an independent contractor and nothing herein shall be deemed to transform CONSULTANT, its staff, independent contractors, or Subconsultants into employees of OC SAN. CONSULTANT’S staff performing services under the Agreement shall at all times be employees and/or independent contractors of CONSULTANT. CONSULTANT shall monitor and control its staff and pay wages, salaries, and other amounts due directly to its staff in connection with the Agreement, as described in Attachment “A1” – Rules of Engagement. CONSULTANT shall be responsible for hiring, review, and termination of its staff and shall be accountable for all reports and obligations respecting them, such as social security, income tax withholding, unemployment compensation, workers’ compensation and similar matters.
18. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of this Agreement, or changes thereto, shall be effected by delivery of said notices in
person or by depositing said notices in the U.S. mail, registered or certified mail, return receipt requested, postage prepaid.
Notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Diane Marzano, Principal Contracts Administrator Copy: Martin Dix, Engineering Manager
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 14 of 20
Notices shall be mailed to CONSULTANT at:
AECOM Technical Services, Inc.
999 Town & Country Road Orange, CA 92868 Attention: Bryan Paine
All communication regarding the Scope of Work, will be addressed to the Engineering Manager. Direction from other OC SAN staff must be approved in writing by OC SAN’s Engineering Manager prior to action from the CONSULTANT.
19. TERMINATION
OC SAN may terminate this Agreement at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination, CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination.
CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this Agreement, when the same are due.
Notice of termination shall be mailed to OC SAN at the address listed in Section 18 - NOTICES.
20. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this Project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to
furnish to OC SAN copies of all memoranda, correspondence, electronic materials, computation and study materials in its files pertaining to the work described in this Agreement, which is requested in writing by OC SAN.
21. COMPLIANCE
A. Labor CONSULTANT certifies by the execution of this Agreement that it pays employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all Federal, state and local directives and executive orders regarding non-discrimination in employment; and that it
agrees to demonstrate positively and aggressively the principle of equal opportunity in employment.
B. Air Pollution
CONSULTANT and its subconsultants and subcontractors shall comply with all applicable Federal, state, and local air pollution control laws and regulations.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 15 of 20
C. Iran Contracting Act
CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208).
D. California Air Resources Board Mobile Source Regulations CONSULTANT and its subconsultants and subcontractors shall comply with the following California Air Resources Board Mobile Source Regulations:
• Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6
• Truck & Bus Regulation (T&B): 13 CCR 2025
• Clean Truck Check (CTC): 13 CCR 2195-2199.1
• Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2 E. California Voluntary Protection Program Annual Reporting Requirement If CONSULTANT will potentially work 1,000 combined hours in a quarter, for the term of the Agreement, CONSULTANT shall provide an annual report detailing
its safety and health information, including, but not limited to, its total number of employees, work hours, number of injuries and illnesses, and number of injury and illness cases involving days away from work, restricted work activity and/or
job transfer. CONSULTANT shall furnish this report to OC SAN no later than January 20th each calendar year. Failure to provide this data by the required due date may result in suspension of CONSULTANT’s services with OC SAN. Any delay arising out of or resulting from such suspension shall be CONSULTANT’s sole responsibility and considered CONSULTANT caused delay, which shall not be compensable by OC SAN. 22. AGREEMENT EXECUTION AUTHORIZATION
Both Parties do covenant that each individual executing this document by and on behalf of each Party is a person duly authorized to execute this Agreement for that Party.
23. DISPUTE RESOLUTION
In the event of a dispute arising between the Parties regarding performance or interpretation of this Agreement, the dispute shall be resolved by binding arbitration
under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services.
24. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS
If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which he may be entitled.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 16 of 20
25. INDEMNIFICATION
To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN, which approval shall not be unreasonably withheld), protect and hold harmless OC SAN
and all of OC SAN’s officers, directors, employees, consultants, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and OC SAN’s general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in carrying out its obligations under this Agreement to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, consultants, Subconsultants, subcontractors,
and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the
Indemnified Parties from any Claim arising solely from: (A) the active negligence or willful misconduct of the Indemnified Parties; or
(B) a natural disaster or other act of God, such as an earthquake; or (C) the independent action of a third party who is neither one of the Indemnified Parties nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them. CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder.
CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the provisions of this Agreement. Under no circumstances shall the insurance requirements
and limits set forth in this Agreement be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this Agreement are contractual and the result of negotiation between the parties hereto. Accordingly, any
rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting Party, shall not be employed in the interpretation of this Agreement.
CONSULTANT is indemnified in OC SAN’s standard construction contracts. This indemnification is in the General Conditions which are attached to OC SAN’s standard construction contracts when these contracts are issued.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 17 of 20
26. DUTY TO DEFEND
The duty to defend hereunder is wholly independent of and separate from the duty to
indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without
regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims.
CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this Agreement until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable
statute of limitations.
27. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES
CONSULTANT shall comply with all OC SAN policies and procedures, including, but not limited to, the Contractor Safety Standards, as applicable, and Human Resources Policies, all as may be amended from time to time.
28. CLOSEOUT
When OC SAN determines that all work authorized under the Agreement is fully complete and that OC SAN requires no further work from CONSULTANT, or the Agreement is otherwise terminated or expires in accordance with the terms of the Agreement, OC SAN shall give the CONSULTANT written notice that the Agreement will be closed out. CONSULTANT shall submit all outstanding billings, work submittals, deliverables, reports or similarly related documents as required under the Agreement within thirty (30) days of receipt of notice of Agreement closeout.
Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the Agreement and will either:
i. Give the CONSULTANT a final Agreement Acceptance: or
ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in the Agreement. Such support must be provided within the timeframe requested by OC SAN.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 18 of 20
Notwithstanding the final Agreement acceptance, the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to
complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise), and the CONSULTANT shall remain obligated under all those provisions of
the Agreement which expressly or by their nature extend beyond and survive final Agreement Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final Agreement Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or Agreement with, the CONSULTANT’s request for final Agreement Acceptance.
29. PROHIBITION
During the term of this Agreement, CONSULTANT and its Subconsultants may not propose on any engineering or construction-related projects advertised by or on behalf of OC SAN if such work presents actual or perceived conflict of interest with
CONSULTANT’s assignments with OC SAN.
CONSULTANT and its Subconsultants shall promptly disclose to OC SAN when such conflict exists prior to participating in any work as advertised by OC SAN or on its behalf.
CONSULTANT and its Subconsultants acknowledge and agree that OC SAN’s determination regarding such conflicts that may impact CONSULTANT’s and its Subconsultants’ ability to propose on the work as described herein shall be final and
cannot be appealed.
30. ENTIRE AGREEMENT
This Agreement constitutes the entire understanding and agreement between the Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 19 of 20
IN WITNESS WHEREOF, this Agreement has been executed in the name of OC SAN and CONSULTANT by their respective duly authorized officers as of the day and year first written
above. CONSULTANT: AECOM TECHNICAL SERVICES, INC. By _______________________________ _________________ Date __________________________________________________ Printed Name & Title ORANGE COUNTY SANITATION DISTRICT
By _______________________________ _________________ Christine Marick Date
Board Vice-Chairwoman By _______________________________ _________________ Kelly A. Lore Date Clerk of the Board By _______________________________ _________________ Kevin Work Date Purchasing & Contracts Manager
Attachments: Attachment “A” – Scope of Work Attachment “A1” – Rules of Engagement Attachment “B” – Not Used Attachment “C” – Not Attached Attachment “D” – Allowable Direct Costs
Attachment “E” – Fee Proposal Attachment “F” – Not Used Attachment “G” – Not Attached Attachment “H” – Not Used Attachment “I” – Not Used
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services AECOM Technical Services, Inc. Page 20 of 20
Attachment “J” – Not Attached Attachment “K” – Not Used
Attachment “L” – Contractor Safety Standards Attachment “M” – Not Attached Attachment “N” – Not Attached
Attachment “O” – Not Attached Attachment “P” – Human Resources Policies DM:ms
ATTACHMENT “A”
SCOPE OF WORK
SCOPE OF WORK PSA2026-001
Page 1 of 12
ATTACHMENT "A"
SCOPE OF WORK
I. SUMMARY
The Orange County Sanitation District (OC SAN) is a special district responsible for wastewater
conveyance and treatment for Northern and Central Orange County, California. OC SAN is a
public agency that operates one of the largest wastewater facilities in the United States of
America. OC SAN is soliciting Proposals to provide Supplemental Engineering Services to
support its engineering projects, which includes large and small capital projects and
operationally funded repair projects.
II. BACKGROUND
OC SAN has budgeted for a 10-year $3.6 billion capital improvement program, the vast majority
of which is managed by the Engineering Department. OC SAN also has an active asset
management program which includes many repair projects that, due to their complexity, are
managed by its Engineering Department.
III. PROFESSIONAL SERVICES REQUIRED
The following descriptions cover the types of professional services OC SAN will require under
this Agreement. OC SAN will determine when specific services are required. The mechanisms
for requesting, reviewing, authorizing, and terminating services under this Agreement are
documented in Attachment "A1" - Rules of Engagement. As described in that attachment,
work assignments will fall into one of the following types:
• Task Authorizations. Task Authorizations have formal Scope of Work and the
CONSULTANT submits a proposal with a fee.
• Task Directives. Task Directives are typically smaller than Task Authorizations where
OC SAN provides a scope and a not-to-exceed fee amount that will be negotiated with
the CONSULTANT.
• Program Role Assignments. In Program Role Assignments, the CONSULTANT shall
provide an appropriately qualified and experienced professional to fulfill the project role
on a portfolio of projects.
OC SAN will authorize specific tasks to be completed by the CONSULTANT and will require the
CONSULTANT to provide staff to fill designated roles on specific projects or within the
Engineering Program, as described in Attachment “A1” – Rules of Engagement.
SCOPE OF WORK PSA2026-001
Page 2 of 12
IV. ENGINEERING DEPARTMENT ROLES AND RESPONSIBILITIES
Architecture
Design and oversee design by CONSULTANT’s of new building and tenant improvement
projects. Work with City Building/Planning Departments, Fire Departments, and other
regulatory agencies as a liaison on behalf of OC SAN to confirm projects comply with
permitting and code requirements.
Prepare more complex plan clarifications and changes in response to Contractor's request
for information during construction and verify that facilities constructed meet design
specifications and regulatory requirements.
Engineering - Construction Management
Construction management activities include the following:
• Perform a variety of work functions supporting the design and construction of
wastewater treatment and collection systems.
• Review construction documents including plans and specifications; interpret plans and
specifications for construction work performed by OC SAN's Contractors; review
submittals for material and equipment conformance to design specifications and plans;
ensure contractual compliance with plans, specifications, codes, and safety requirements;
verify that materials being incorporated into project are per specification and with
approved construction practices; and coordinate equipment isolations, shutdowns, and
equipment and process tie-ins.
• Prepare progress payments to the Contractor.
• Perform analysis of change orders; negotiate fair and reasonable costs for change
orders; and prepare change order documentation.
• Oversee the start-up of facilities and schedule staff training.
• Provide technical assistance and support to engineers and project managers.
• Prepare a variety of administrative and technical memos, letters, and correspondence.
• Perform constructability reviews.
• Maintain comprehensive contractual records and periodically monitor progress of all
goods and service agreements from inception through completion to enforce milestones,
deliverables, and post-contract warranties.
Engineering - Civil / Mechanical
Prepare CONSULTANT Scope of Work. Review proposals and assist OC SAN in the
CONSULTANTS’ selection process.
SCOPE OF WORK PSA2026-001
Page 3 of 12
Design or oversee design by CONSULTANT’s of sanitary sewers, sewer rehabilitation,
mechanical piping systems, wastewater treatment systems, reclaimed water systems, lift
stations, etc. including calculations. Lead design reviews to perform a comprehensive multi-
discipline design review on assigned projects. Prepare detailed drawings, technical
specifications, and calculations for in-house designs on small projects.
Respond to engineering bid questions and addenda. Perform construction support services,
respond to Contractor's request for information, review construction submittals and verify
that equipment meets design specifications, prepare design changes, review Contractor’s
requested design changes, and support startup and commissioning.
Engineering - Electrical
Provide electrical engineering services including design, design review, interdisciplinary
review of design documents, and construction support service for collections and
wastewater treatment plant facilities. Design and oversee design by CONSULTANT’s for
medium voltage and low voltage electrical distribution systems including switchgear, motor
control centers and standby power. Design includes single line diagrams, elementary
diagrams, motor control schematics, short circuit calculations, protective device coordination
studies, raceway/wire design, and hazardous area classification.
Perform construction support services, respond to Contractor's request for information,
review construction submittals and verify that equipment meets design specifications,
prepare design changes, review Contractor’s requested design changes, review
InterNational Electrical Testing Association (NETA) test results, and perform electrical
system startup and commissioning for standby power and low and medium-voltage systems.
Perform short circuit calculations and protective device coordination studies utilizing
Electrical Transient Analyzer Program (ETAP) software.
Engineering - Instrumentation and Control
Provide instrumentation and control engineering services including design, design review,
interdisciplinary review of design documents, construction support service, and
commissioning support for collections and wastewater treatment plant control systems.
Design and oversee design by CONSULTANT’s for process and instrumentation diagrams,
control strategies, control system network diagrams, control system input/output lists, control
panel drawings, and commissioning procedures.
Perform construction support services, respond to Contractor's request for information,
review construction submittals and verify that equipment meets design specifications,
prepare design changes, review Contractor’s requested design changes, and support
startup and commissioning.
SCOPE OF WORK PSA2026-001
Page 4 of 12
Engineering - Commissioning Coordinator
Provide technical leadership and management of the development of commissioning
procedures during design; review the proposed construction sequencing and commissioning
packages established during design; review finalized commissioning procedures during
construction; work closely and coordinate with the Contractor's commissioning coordinator;
provide oversight of the Contractor's commissioning and start-up process and coordinate
startups with operations and maintenance; coordinate OC SAN's inspection, control system
programming, and engineering resources to support the Contractor's commissioning
process; track outstanding commissioning items and support their resolution and work
closely with the Resident Engineer to provide commissioning status and notification of any
issues or concerns. The commissioning coordinator shall have knowledge in electrical,
instrumentation, control systems, and process control.
Engineering - Structural
Provide structural analysis as needed to recommend structural improvements to existing
facilities, analyze structural failures, and recommend repairs.
Design and oversee design by CONSULTANT’s of structural systems for collections and
wastewater facilities. Review proposals, technical memoranda, and designs prepared by
others and prepare engineering analysis. Prepare detailed drawings, technical
specifications, and calculations for in-house designs on small projects.
Perform construction support services, respond to Contractor’s requests for information,
review construction submittals and verify that equipment meets design specifications and
regulatory requirements, prepare more complex structural engineering design changes
during construction and review Contractor’s requested design changes.
Inspection
Various disciplines may need continuous construction inspection including Civil, Structural,
Pipeline, Mechanical, Electrical, and Instrumentation for rehabilitation and replacement of
collections and wastewater treatment plant facilities.
Inspection activities include the following:
• Provide construction inspection for plant and collection facilities construction work
performed by Contractors to confirm contractual compliance with plans, specifications,
codes, regulations, and OC SAN's safety standards.
• Prepare a variety of reports and documentation.
• Review construction documents including plans and specifications.
• Review construction submittals.
• Inspect plant and collection facilities construction work performed by Contractors.
SCOPE OF WORK PSA2026-001
Page 5 of 12
• Verify that materials being incorporated into project are per specification and with
approved construction practices.
• Coordinate equipment and process isolations, shutdowns, and tie-ins.
• Assist safety representatives with job hazard analysis.
• Observe Contractors work safety environment and compliance with OC SAN's safety
standards, Cal/OSHA, regulations, and traffic control requirements and work with
Contractor to establish and maintain a safe construction project for employees,
customers, and the public.
• Document and follow-up on actions regarding safety, traffic control plans, and working
practices.
• Assist in the maintenance of accurate as-built contract drawings.
• Verify Contractor as-built drawings are maintained and correct.
• Assist Resident Engineers on requests for information, field change orders, plan
clarifications, and plan changes.
• Review and approve final drawings for the preparation of record drawings.
• Prepare and maintain necessary construction inspection records and reports as a means
of formal documentation including daily inspection reports, photo-logs, field test results,
force account reports, extra work requests, project submittal files, and individual project
logs.
• Assist Resident Engineer in reviewing the Contractor’s monthly progress invoices.
• Attend construction meetings.
• Participate in commissioning.
• Perform field walks and develop punch lists.
• Work with Contractors, regulatory agencies, utilities, city officials, and the general public
throughout the construction project to coordinate work to be accomplished and ensure
the project is completed successfully with minimum impact on the public or OC SAN
facilities.
Project Management
Project management functions for major capital projects include developing schedules, cost
estimates, and staffing requirements; assembling and leading project teams; planning,
directing, and coordinating activities of projects to confirm that goals and objectives of
projects are accomplished on schedule and within prescribed budget; inspecting quality and
quantity of work; managing the selection of outside CONSULTANT’s; and preparing and
presenting reports and other necessary correspondence on assigned projects.
SCOPE OF WORK PSA2026-001
Page 6 of 12
Manage a project or group of projects through all six phases of the Engineering Project Life
Cycle including project development, preliminary design, design, construction and
installation, commissioning, and closeout.
Manage, direct, and coordinate activities of the project team to confirm the project
progresses on schedule within prescribed budget and with acceptable quality. Confer with
project team to provide technical advice and resolve problems and conduct project team
meetings to confirm adequate communication of project status.
Perform periodic review of assigned work to confirm that the work is satisfactory and is
completed according to plan.
Interface with senior management, peers, project staff, CONSULTANT’s, customers, and
users as necessary to coordinate project execution and inform stakeholders of project status
and possible outcomes.
Prepare project reports for the Board of Directors, management, and others and make
presentations as necessary.
Provide project management oversight of the selection process of outside CONSULTANT’s;
oversee the bid, proposal, and selection/purchase recommendation process for major
capital projects; solicit proposals; review proposals; assist OC SAN's evaluation teams with
selection of CONSULTANT’s; negotiate the fee; and establish schedules and performance
criteria.
Work with CONSULTANT’s on project planning, preparation, scheduling, and execution of
contracts and ensure work is completed on time and in conformance with plans and
specifications.
Apply project management tools as required to address the financial aspects and impacts of
project variables such as delays to the project schedule and changes to the project scope.
Serve as a liaison for the Engineering Department with other OC SAN departments,
divisions, and outside agencies and provide project representation to commissions,
committees, and task forces.
Support - Administrative
Administrative support activities include the following:
• Perform a variety of secretarial, advanced clerical, and routine administrative and
programmatic work in support of assigned projects or programs, division, or department.
• Participate in the administration of approved policies and procedures.
• Prepare financial analysis and a variety of reports as required.
• Provide information and assistance to other assigned project or program staff regarding
assigned programs, policies, and procedures.
SCOPE OF WORK PSA2026-001
Page 7 of 12
Support - Submittals
Submittals support activities include the following:
• Coordinates the submittal review process between Contractors and OC SAN staff.
• Reviews submittals to determine compliance with the submittal submission processes.
• Consolidates submittal comments for final review.
• Finalizes and distributes facilities records.
Support - Cost Estimating
Cost estimating activities include the following:
• Prepare cost estimates to provide detailed information regarding quantity and cost of
materials and labor.
• Develop processes and/or techniques that provide clear and standard estimating
methods across projects.
• Provide data for analytical comparisons between projects.
• Review project cost estimates as projects advance through the design process.
• Review engineering plans and specifications to determine materials and quantities
required by project specifications.
• Recommend cost saving changes.
• Review cost estimates and change orders submitted by construction Contractors and
provide recommendations.
• Prepare general budget estimates for new projects.
Estimating shall include all disciplines including architectural, civil, structural, mechanical,
plumbing, heating and air conditioning, fire protection, electrical, and control systems.
Support - Construction Scheduling
Perform a variety of scheduling reviews and analyses involving wastewater treatment and
collection systems, including the following activities:
• Review design submittals prior to bid to confirm scope is achievable in the time
stipulated.
• Establish clear specifications and enforcement provisions with the Contractors by
placing schedule performance and proof of impact on the Contractors.
• Review construction Contractor's schedules for effective Contractor performance.
Identify changes to the critical path.
• Review baseline schedule submittals.
SCOPE OF WORK PSA2026-001
Page 8 of 12
• Support the Resident Engineer and Project Manager during scheduling meetings so they
are effective and productive.
• Maintain careful documentation of all schedule submittals so that any requests for time
adjustments can be measured against the approved schedule in place at the time of
impact is claimed.
• Monitor actual progress versus planned progress. Provide exception reporting and
recommend actions.
• Perform analysis of change orders such as time impact analysis (TIA) and productivity
claims.
Support - Construction Claims / Mitigation
Prepare detailed analysis of Contractor-submitted requests for change, delay claims, TIAs,
and/or government code claims including productivity loss claims, claims for differing site
conditions, and/or total cost claims. Work may include analysis of liability, review of contract
language and supporting documents, validating extended overhead costs, and review and
analysis of any other supporting documentation.
Work may also include a proactive strategy to reduce exposure, review of reporting
requirements and practices, and conferring with project teams and/or managers to
effectively implement practices to reduce liability and/or risk.
Support - Computer Aided Design Drafting and Design
Computer Aided Design (CAD) drafting and design support include the following activities:
• Use CAD equipment to provide support to Engineers by preparing layouts, detail
drawings, sketches, and diagrams. Drawings are to include all views and dimensions
necessary for construction of wastewater treatment and collection systems. Work must
comply with OC SAN CAD Manual.
• Draft engineering drawings of proposed wastewater treatment facility construction
projects from engineer's design drawings including structures and notations and review
maps and existing drawings to determine utility locations, elevations, and other related
information.
• Consolidate changes made on drawings by CONSULTANT’s, engineers and inspectors
with Contractor's as-built drawings to draft final record drawings on a wide variety of
wastewater treatment facility construction projects.
• Conduct field visits to confirm existing conditions and finished construction configuration.
• Make appropriate notes of sizes, diameters, locations, and other significant information
and return to project engineer.
• Provide technical assistance and support to engineers and engineering aides.
SCOPE OF WORK PSA2026-001
Page 9 of 12
Support - Outreach
Provide community and stakeholder outreach support for OC SAN projects during design
and construction phases. Work may include the following activities:
• Develop outreach plans, schedules, and budgets identifying project areas, community
concerns, community events, demographics, and language needs.
• Identify stakeholders and communication strategies, including property owners, tenants,
businesses, schools, and public officials.
• Plan, organize, and staff public meetings, including presentation development and
meeting summaries.
• Conduct door-to-door or neighborhood outreach to impacted residents and businesses.
• Develop and design outreach materials such as fact sheets, notifications, press
releases, website updates, and social media content consistent with OC SAN branding.
• Develop and implement crisis communication plans.
V. LOGISTICS AND CONTRACT MANAGEMENT
Work Location
CONSULTANT's on-site staff shall work from at OC SAN's facilities in Fountain Valley or
Huntington Beach, California. At times, work may be required at other OC SAN facilities or
at job site locations away from OC SAN facilities. At the CONSULTANT's discretion and
concurrence with the OC SAN representative, the assigned CONSULTANT staff may be
located at CONSULTANT's home office. Advanced coordination with OC SAN may be
required for CONSULTANT staff working at OC SAN facilities on OC SAN holidays.
Point of Contact/Supervision
CONSULTANT shall designate an individual as the single point of contact to direct efforts in
fulfilling contracted obligations under this Agreement. The selected designee shall be
responsible for the direct supervision of assigned staff, including such activities as directing
work, work schedules, quality of work performed, technical oversight, vacation requests,
discipline, etc. The selected designee shall not be changed without prior written notification
to the OC SAN representative.
CONSULTANT shall be responsible for supervision of its entire staff, including the
requirements defined in Attachment "A1" - Rules of Engagement.
SCOPE OF WORK PSA2026-001
Page 10 of 12
OC SAN Project Document Management
CONSULTANT's staff assigned to work on OC SAN projects shall save project related
deliverables, documents, and/or records in OC SAN accessible locations (i.e., OC SAN
SharePoint servers and/or OC SAN licensed cloud-based applications such as Bluebeam,
PMWeb or One Drive) as applicable to the project assignment to comply with Public
Records Act requirements. Accessibility to these locations will be provided by OC SAN.
Provided Facilities & Equipment
OC SAN shall provide the following for CONSULTANT's on-site staff:
• Furnished office space at OC SAN
• Computers, software, network, and printing capabilities
• Office telephone
Personal Protective Equipment
CONSULTANT staff assigned to OC SAN facilities may be exposed to known plant process
and work hazards and therefore shall have appropriate Personal Protective Equipment
(PPE) such as: eye and face protection (safety glasses), head protection (hard hat), hand
protection (gloves), foot protection (safety toed shoes), high visibility clothing (Class 3
vests), hearing protection, personal gas monitor (4 gas), fall protection (harness and
lanyard), and other forms of PPE. CONSULTANT shall provide all equipment and training
necessary to comply with OC SAN safety polices. Refer to Attachment "L" - Contractor
Safety Standards.
Time Tracking & Invoicing
CONSULTANT shall submit invoices, including cost and hours, monthly. Invoice shall be
submitted no later than the 15th of each month. OC SAN maintains a project controls
system containing detailed cost and hours information for all Engineering Projects. The
format for reporting hours shall be in an importable format such as Microsoft Excel and
contain, at a minimum, the following items:
Column Description
Project Number OC SAN shall provide a list of project numbers. These numbers
are subject to change as new projects are added, and existing
projects are completed.
Work Package
Number
OC SAN shall provide a list of work package numbers. The work
package numbers are subject to change as a project transitions
from one phase to the next.
Employee ID Each employee included in the hours report must contain a unique
identification number.
Employee Name Employee name.
SCOPE OF WORK PSA2026-001
Page 11 of 12
Work Date The week ending date when work was performed.
Hours by Week The total number of hours worked for the week. In addition, it may
be necessary to report overtime hours which will require a
separate report.
Total Burdened Cost The total burdened cost shall include actual salary, fringe costs,
overhead, and profit by person.
Work Quality
CONSULTANT shall be responsible for the professional quality and technical competence of
assigned staff supplied to OC SAN. Additionally, the firm shall be responsible for the
coordination of all efforts and other services furnished under the Agreement.
Billing Guidance
The following guidance establishes which activities performed by CONSULTANT are
considered billable and non-billable under this Agreement.
Non-Billable Activities
The following activities are not billable to OC SAN:
• Proposal and staffing activities: Time spent identifying staff, preparing or submitting
proposal material, or negotiating budgets is considered marketing and is not billable.
• Pre-selection communications: Before OC SAN selects a firm for a request, any
clarifications, questions, or discussions should be directed to the designated Submitter.
CONSULTANT shall not consult directly with OC SAN staff outside of the Submitter.
Any such time is non-billable.
• General training: Technical training is not billable except for training specific to OC SAN
requirements, procedures, or standards.
• Internal performance management: Time spent addressing or documenting performance
issues of assigned staff is not billable.
• Other OC SAN-unrequested activities: Any tasks performed without a formal request or
outside of authorized Scope of Work, task directives, or task authorizations are non-
billable.
Billable Activities
The following activities are generally billable to OC SAN:
• Preparing and submitting invoices.
• Managing the CONSULTANT’s internal billing codes.
• Preparing progress reports for assigned tasks.
• Providing technical guidance and oversight to assigned staff.
• Managing task directives and task authorizations.
• Performing quality control for task directives and task authorizations.
SCOPE OF WORK PSA2026-001
Page 12 of 12
• Attending regular coordination meetings with OC SAN Management.
• Training CONSULTANT staff on OC SAN-specific requirements, procedures, and
standards.
Program-level support activities, rather than project-specific work, shall be billed to Project
SP-195, Work Package 3210.
Management of Resource Assignments
OC SAN will maintain a cloud-based workflow tool to request, review, authorize, and close
resource assignments. That workflow tool is currently PMWeb. CONSULTANT's Point of
Contact shall utilize this tool to track all requests through their life cycles. OC SAN will use
this workflow tool to verify that any invoiced costs have been duly approved through the
workflow tool.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 1 of 20
PROFESSIONAL SERVICES AGREEMENT
This PROFESSIONAL SERVICES AGREEMENT, (hereinafter referred to as “Agreement”), is made and entered into to be effective the 1st day of October, 2026, by and between the ORANGE COUNTY SANITATION DISTRICT, (hereinafter referred to as "OC
SAN"), and Jacobs Project Management Co., (hereinafter referred to as "CONSULTANT"). OC SAN and CONSULTANT are referred to herein collectively as the "Parties" or individually as a "Party." WITNESSETH: WHEREAS, OC SAN desires to engage CONSULTANT for Supplemental Engineering Services, PSA2026-001, to provide qualified staff as described in Attachment “A”, Scope of Work; and Attachment “A1”, Rules of Engagement; and WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the requisite personnel and experience, and is capable of performing such services; and
WHEREAS, OC SAN has adopted procedures for the selection of professional services and has proceeded in accordance with said procedures to select CONSULTANT to perform this work; and
WHEREAS, OC SAN shall manage selection of a Consultant for Task Order(s) when requested after award of this Agreement based on the most appropriate qualifications and fit; and WHEREAS, at its regular meeting on July 22, 2026, the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee to approve this Agreement. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows:
1. SCOPE OF WORK
CONSULTANT agrees to furnish necessary professional services to accomplish the Scope of Work attached hereto as Attachment “A", and is hereby incorporated into this Agreement. In the event of a conflict between the Scope of Work and this Agreement,
the terms of this Agreement shall prevail.
The standard of care applicable to CONSULTANT’s services will be the degree of skill and diligence normally employed by professional engineers or consultants performing
the same or similar services at the time CONSULTANT’s services are performed.
2. COMPENSATION Total compensation shall be paid to CONSULTANT for the services in accordance with the following provisions:
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 2 of 20
A. Time and Material: Not to Exceed Aggregate Amount
OC SAN shall compensate CONSULTANT for services performed under this Agreement on a time and materials basis, not to exceed a maximum aggregate amount of Twenty-Seven Million Nine Hundred Thousand Dollars ($27,900,000)
(“Total Compensation”) during the term of the Agreement.
B. Hourly Rates As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus benefits, overhead, and profit) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT as set forth in Attachment “E” (attached hereto and incorporated herein by reference). OC SAN shall also pay to CONSULTANT a sum equal to the premium costs for overtime, charged on an hourly-rate basis, actually paid by CONSULTANT to the non-exempt personnel of CONSULTANT plus profit.
Premium costs for overtime will not include fringe and overhead. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this Agreement.
C. Overhead i. “Field Office Staff” are defined as project-assigned staff by CONSULTANT,
working at OC SAN’s facilities for a project-assigned period exceeding ninety (90) continuous calendar days. The overhead rates for Field Office Staff are included in Attachment “E”. ii. “Home Office Staff” are defined as staff assigned by CONSULTANT, supporting the project-assigned work, either by working at CONSULTANT’s or Subconsultant’s offices or at OC SAN’s site for periods less than ninety (90) continuous calendar days. The overhead rates for Home Office Staff are included in Attachment “E”.
D. Profit
Profit for CONSULTANT and Subconsultants shall be five percent (5%). Addenda shall be governed by the same maximum Profit percentage. As a portion of the total compensation to be paid to CONSULTANT and
Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this Agreement.
E. Subconsultants
For all Subconsultants, CONSULTANT may pay to Subconsultants total compensation on an hourly-rate basis per Attachment “E” - Fee Proposal and as specified in the Scope of Work. OC SAN shall pay to CONSULTANT the actual costs of Subconsultants, without markup.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 3 of 20
F. Reimbursable Direct Costs
OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this Agreement (attached hereto and incorporated
herein by reference). The reimbursement of the above-mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at https://www.gsa.gov/travel/plan-book/per-diem-rates. Reimbursement. The CONSULTANT shall be responsible for the most economical and practical means or management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical.
Returns. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN.
Travel and travel arrangements. Any travel involving airfare, overnight stays or multiple day attendance must be approved by OC SAN in advance.
Local Travel. Local Travel is considered travel by the CONSULTANT within OC SAN geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial, and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel. Lodging. Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN.
Travel Meals. Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for
travel times. Receipts are not required for the approved meals. Additional details related to the reimbursement of the allowable direct costs are
provided in the Attachment “D” - Allowable Direct Costs of this Agreement. Actual Costs. OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN. OC SAN will not pay per diem for Field Office Staff nor will it pay for any relocation
of staff to be assigned under this Agreement.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 4 of 20
G. Limitation of Costs
If, at any time, CONSULTANT estimates the cost of performing the services described in CONSULTANT’s Task Authorizations will exceed seventy-five percent (75%) of the not-to-exceed amount of the Task Authorization,
CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this Agreement.
3. REALLOCATION OF TOTAL COMPENSATION
OC SAN shall have the right to approve a reallocation of the incremental amounts
constituting the Total Compensation, provided that the Total Compensation is not increased.
4. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period, in a format acceptable to OC SAN.
CONSULTANT shall warrant and certify the accuracy of these costs and provide all support documentation required by OC SAN. CONSULTANT understands that submitted costs are subject to Section 16 Audit Provisions. B. Upon receipt of a properly prepared invoice, as described above, payment shall be made by OC SAN to CONSULTANT within thirty (30) calendar days.
C. Upon satisfactory completion of the work performed hereunder and prior to final payment under this Agreement for such work, or prior settlement upon termination of this Agreement, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this Agreement other than such claims, if any, as may be specifically exempted by CONSULTANT from the
operation of the release in stated amounts to be set forth therein.
D. Pursuant to the California False Claims Act (Government Code sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for
compensation under the terms of this Agreement may be held liable for treble damages and up to a $10,000 civil penalty for each false claim submitted. This section shall also be binding on all Subconsultants.
A CONSULTANT or Subconsultant shall be deemed to have submitted a false claim when the CONSULTANT or Subconsultant: (a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 5 of 20
made or used a false record or statement to get a false claim paid or approved by OC SAN; (c) conspires to defraud OC SAN by getting a false claim allowed or
paid by OC SAN; (d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or (e) is a beneficiary of an inadvertent submission of a false claim to OC SAN,
and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim.
5. TERM
This Agreement shall commence upon the effective date first written above, and shall continue in full force and effect through September 30, 2029, (Initial Term) unless earlier terminated or extended as provided in the Agreement.
OC SAN, at its sole discretion, may elect to extend the term of this Agreement up to an additional twelve (12) months, commencing October 1, 2029, and continuing through September 30, 2030, (Option Term 1), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A” and Attachment “A1”.
OC SAN, at its sole discretion, may elect to extend the term of this Agreement up to an additional twelve (12) months, commencing October 1, 2030, and continuing through September 30, 2031, (Option Term 2), and thereupon require CONSULTANT to
continue to provide services, and otherwise perform, in accordance with Attachment “A” and Attachment “A1”.
OC SAN’s election to extend the Agreement beyond the Initial Term shall not diminish its
right to terminate the Agreement for OC SAN’s convenience or CONSULTANT’s default as provided elsewhere in this Agreement. The “maximum term” of this Agreement shall be from the effective date first written above through September 30, 2031, which period
encompasses the Initial Term and two (2) Option Terms.
6. PREVAILING WAGES
A. To the extent CONSULTANT intends to utilize employees who will perform work during the Agreement, as more specifically defined under Labor Code Section 1720, CONSULTANT shall be subject to prevailing wage requirements with respect to such employees.
7. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES
A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR
and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section
1771.4, the work is subject to compliance monitoring and enforcement by the DIR.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 6 of 20
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall
submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776.
C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations.
D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e).
8. CONFLICT OF INTEREST CODE
OC SAN may designate some or all of the individuals performing services under the Agreement as “designated positions” subject to OC SAN’s Conflict of Interest Code. CONSULTANT employees or Subconsultants acting in these designated positions must comply with certain requirements under the Political Reform Act. CONSULTANT employees or Subconsultants acting in these designated positions must file an annual
report identifying some or all of their financial interests such as sources of income, sources of gifts received from special sources of income and sources of gifts. Currently the limit is $630 per year from any one source. CONSULTANT and all its employees,
staff, or personnel assigned to an OC SAN designated position shall comply with the Political Reform Act and related reporting requirements and gift limitation.
9. INDEPENDENT CONTRACTOR
The CONSULTANT and Subconsultants shall be independent contractors and not agents or employees of OC SAN. Any provisions of this Agreement that may appear to give OC SAN the right to direct the CONSULTANT concerning the details of performing the professional services, or to exercise any control over such performance, shall mean only that the CONSULTANT shall follow the direction of OC SAN concerning the end results of the performance.
10. DOCUMENT OWNERSHIP – CONSULTANT PERFORMANCE
A. Ownership of Documents for the professional services performed.
All documents in all forms (electronic, paper, etc.), including, but not limited to, studies, sketches, drawings, computer printouts, disk files, and electronic copies prepared in connection with or related to the Scope of Work or professional
services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed.
OC SAN ownership entitlement arises upon payment or any partial payment for work performed and includes ownership of any and all work product completed
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 7 of 20
prior to that payment. This Section shall apply whether the CONSULTANT’s professional services are terminated: a) by the completion of the Agreement, or
b) in accordance with other provisions of this Agreement. Notwithstanding any other provision of this paragraph or Agreement, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer
printouts and disk files, and specifications. OC SAN acknowledges that documents prepared through professional services must be revised and sealed by a professional engineer prior to their reuse on another project. OC SAN acknowledges that it assumes all risk associated with reuse of such documents, which are not undertaken by CONSULTANT.
B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the study or deliverable where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service rendered by CONSULTANT was not a proximate cause of the damage.
11. INSURANCE
A. General Insurance shall be issued and underwritten by insurance companies acceptable
to OC SAN based on the following requirements: i. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial
Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Workers’ Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent. ii. Coverage shall be in effect prior to the commencement of any work under
this Agreement. B. General Liability
The CONSULTANT shall maintain during the life of this Agreement, including the period of warranty, commercial general liability insurance written on an
occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000) general aggregate. If aggregate limits apply separately to this Agreement (as evidenced by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: premises-operations, contractual liability coverage applicable to the liabilities assumed under this Agreement, products liability/completed operations (including any product manufactured or
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 8 of 20
assembled), broad form property damage, contractual liability coverage applicable to the liabilities assumed under this Agreement, independent
contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the
actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) must be included in the general liability policy and coverage must be reflected on the submitted certificate of insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor, or subcontractor performing work or rendering services on behalf of OC SAN in connection with the planning, development, and construction of the project. In all insurance coverages related to the work, CONSULTANT shall cause its insurers to waive rights of subrogation
against OC SAN and its officers, employees, and agents with respect to claims arising out of CONSULTANT’s performance of the work. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance
clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did
not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged. C. Automobile/Vehicle Liability Insurance The CONSULTANT shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: combined single limit of One Million Dollars ($1,000,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement.
D. Umbrella Excess Liability
The minimum limits of general liability and automobile liability insurance required, as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess coverage.
Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automobile liability. E. Workers’ Compensation Insurance The CONSULTANT shall provide such workers’ compensation insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including employer’s liability insurance with a minimum limit of One Million Dollars ($1,000,000) each accident, One Million Dollars ($1,000,000)
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 9 of 20
disease each employee, and One Million Dollars ($1,000,000) disease policy limit. Such workers’ compensation insurance shall be endorsed to provide for a
waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance Fund and the identifier “SCIF”
and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones Act claims. F. Errors and Omissions/Professional Liability CONSULTANT shall maintain in full force and effect, throughout the term of this Agreement, standard industry form professional liability / errors and omissions insurance coverage with coverage limits of not less than Five Million Dollars ($5,000,000) per claim and Five Million Dollars ($5,000,000) aggregate in accordance with the provisions of this paragraph. If the policy of insurance is
written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of five (5) years from the date of the completion of the services hereunder.
In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of
CONSULTANT during the course of performing services under the terms of this Agreement. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis, said policy shall be continued in full force and effect during the term of this Agreement or until completion of the services provided for in this Agreement, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts or omissions of CONSULTANT during the course of performing services under
the terms of this Agreement. CONSULTANT shall provide to OC SAN a certificate of insurance in a form
acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term.
G. Drone Liability Insurance If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of One Million Dollars ($1,000,000) written by an insurer authorized to do business in California and having a current A.M. Best rating of not less than A-:VII, or otherwise acceptable to OC SAN. Coverage shall specifically include commercial UAS/drone operations and shall be maintained in a form acceptable by OC SAN.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 10 of 20
H. Proof of Coverage
The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and
endorsements are to be received and approved by OC SAN before work commences. Upon request, CONSULTANT shall provide certified copies of applicable insurance policies and endorsements evidencing the coverage required under this Agreement, subject to redaction of confidential or proprietary information not relevant to such coverage. The following are approved forms that must be submitted as proof of coverage:
•insurance form
• (General Liability) CG 20 10 and CG 20 37 All other additional insured endorsements must be
submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN.
• (Automobile Liability) OC SAN approval.
•subrogation endorsement provided by carrier for OC SAN approval.
• Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below.
I. Cancellation and Policy Change Notice
The CONSULTANT is required to notify OC SAN in writing of any insurance
cancellation notice it receives or other knowledge of pending or actual insurance
policy cancellation within two (2) working days of receipt of such notice or
acquisition of such knowledge. Additionally, the CONSULTANT is required to
notify OC SAN in writing of any change in the terms of insurance, including
reduction in coverage or increase in deductible/SIR, within two (2) working days of receipt of such notice or knowledge of same.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 11 of 20
Said notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT
18480 Bandilier Circle
Fountain Valley, CA 92708
Attention: Contracts, Purchasing & Materials Management Division J. Primary Insurance
The general and automobile liability policies shall contain a “Primary and Non-Contributory” clause. Any other insurance maintained by OC SAN shall be
excess and not contributing with the insurance provided by CONSULTANT. K. Separation of Insured
The general and automobile liability policies shall contain a “Separation of Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this Agreement, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property.
M. Deductibles and Self-Insured Retentions Any deductible and/or self-insured retention must be declared to OC SAN on the
certificate of insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the
CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses. N. Defense Costs The general and automobile liability policies shall have a provision that reasonable defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits. O. Subconsultants
The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in
amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 12 of 20
P. Limits Are Minimums The insurance limits specified in this Agreement are minimum requirements only and shall not limit the liability of the CONSULTANT. If a claim or incident arising out of the CONSULTANT’s performance under this Agreement exceeds the minimum required insurance limits, CONSULTANT shall remain fully responsible for all amounts in excess of such minimum required limits, up to the full extent of CONSULTANT’s liability under this Agreement.
12. KEY POSITIONS
CONSULTANT shall notify OC SAN in advance changes to any key CONSULTANT employees or Subconsultants performing services under this Agreement. Positions considered to be Key Positions are Point of Contact, and any field office staff working under the Agreement. Should a CONSULTANT employee or Subconsultant within one of
these categories become no longer available to OC SAN, CONSULTANT shall submit the resume and qualifications of the proposed replacement to OC SAN for approval as soon as possible, but in no event later than seven (7) calendar days prior to the
departure of the incumbent Key Position unless CONSULTANT is not provided with such notice by the departing staff.
13. SCOPE CHANGES
In the event of a change in the Scope of Work or a change in Key Personnel or change
in hourly rates as requested by OC SAN, the Parties hereto shall execute an Amendment to this Agreement setting forth with particularity all terms of the new Agreement. CONSULTANT’s compensation for additional services authorized and
performed in accordance with this Agreement shall be agreed to by the Parties in writing prior to the time that the additional services are authorized. CONSULTANT hereby agrees to use any and all procedures, programs, and systems required by OC SAN to
process and execute such Amendment(s), including, but not limited to, computer programs and systems.
14. PROJECT TEAM AND SUBCONSULTANTS
Neither this Agreement nor any interest herein nor claim hereunder may be assigned by CONSULTANT either voluntarily or by operation of law, nor may all or any part of the Agreement be subcontracted by CONSULTANT, without the prior written consent of OC SAN. Consent by OC SAN shall not be deemed to relieve CONSULTANT of its obligation to comply fully with all terms and conditions of this Agreement.
CONSULTANT shall provide to OC SAN, prior to execution of this Agreement, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used under this Agreement by CONSULTANT. CONSULTANT shall include a description of the work and services to be done by each Subconsultant and each of CONSULTANT’s team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each
Subconsultant, broken down as indicated in Section 2- COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT’s team members without prior written approval by OC SAN.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 13 of 20
15. ENGINEERING REGISTRATION
The CONSULTANT's personnel and Subconsultants are comprised of registered
engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered engineer but represents and agrees that wherever, in the performance of this Agreement, the services of a registered engineer is required, such services
hereunder will be performed under the direct supervision of registered engineers who are registered in California.
16. AUDIT PROVISIONS
A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents, and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this Agreement.
The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this Agreement during the term of this Agreement and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project
related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all accounting records and documents, and any other financial data related to this Agreement.
17. LEGAL RELATIONSHIP BETWEEN PARTIES
The legal relationship between the Parties hereto is that of an independent contractor and nothing herein shall be deemed to transform CONSULTANT, its staff, independent contractors, or Subconsultants into employees of OC SAN. CONSULTANT’S staff performing services under the Agreement shall at all times be employees and/or independent contractors of CONSULTANT. CONSULTANT shall monitor and control its staff and pay wages, salaries, and other amounts due directly to its staff in connection with the Agreement, as described in Attachment “A1” – Rules of Engagement.
CONSULTANT shall be responsible for hiring, review, and termination of its staff and shall be accountable for all reports and obligations respecting them, such as social security, income tax withholding, unemployment compensation, workers’ compensation
and similar matters.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 14 of 20
18. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of
this Agreement, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return receipt requested, postage prepaid.
Notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Diane Marzano, Principal Contracts Administrator Copy: Martin Dix, Engineering Manager Notices shall be mailed to CONSULTANT at:
JACOBS PROJECT MANAGEMENT CO. 2600 Michelson Drive, Suite 500 Irvine, CA 92612 Attention: Anni Larkins
All communication regarding the Scope of Work, will be addressed to the Engineering Manager. Direction from other OC SAN staff must be approved in writing by OC SAN’s Engineering Manager prior to action from the CONSULTANT.
19. TERMINATION
OC SAN may terminate this Agreement at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination,
CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination.
CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this Agreement, when the same are due.
Notice of termination shall be mailed to OC SAN at the address listed in Section 18 - NOTICES.
20. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this Project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, electronic materials,
computation and study materials in its files pertaining to the work described in this Agreement, which is requested in writing by OC SAN.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 15 of 20
21. COMPLIANCE
A. Labor
CONSULTANT certifies by the execution of this Agreement that it pays employees not less than the minimum wage as defined by law, and that it does
not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all Federal, state and local directives and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment.
B. Air Pollution CONSULTANT and its subconsultants and subcontractors shall comply with all applicable Federal, state, and local air pollution control laws and regulations. C. Iran Contracting Act
CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208).
D. California Air Resources Board Mobile Source Regulations
CONSULTANT and its subconsultants and subcontractors shall comply with the following California Air Resources Board Mobile Source Regulations:
• Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6
• Truck & Bus Regulation (T&B): 13 CCR 2025
• Clean Truck Check (CTC): 13 CCR 2195-2199.1
• Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2 E. California Voluntary Protection Program Annual Reporting Requirement If CONSULTANT will potentially work 1,000 combined hours in a quarter, for the
term of the Agreement, CONSULTANT shall provide an annual report detailing its safety and health information, including, but not limited to, its total number of employees, work hours, number of injuries and illnesses, and number of injury
and illness cases involving days away from work, restricted work activity and/or job transfer. CONSULTANT shall furnish this report to OC SAN no later than January 20th each calendar year.
Failure to provide this data by the required due date may result in suspension of CONSULTANT’s services with OC SAN. Any delay arising out of or resulting from such suspension shall be CONSULTANT’s sole responsibility and considered CONSULTANT caused delay, which shall not be compensable by OC SAN.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 16 of 20
22. AGREEMENT EXECUTION AUTHORIZATION
Both Parties do covenant that each individual executing this document by and on behalf
of each Party is a person duly authorized to execute this Agreement for that Party.
23. DISPUTE RESOLUTION
In the event of a dispute arising between the Parties regarding performance or
interpretation of this Agreement, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services.
24. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS
If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which he may be entitled.
25. INDEMNIFICATION
To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at
CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN, which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, consultants, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and OC SAN’s general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in carrying out its obligations under this Agreement to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, consultants, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified
Party. Notwithstanding the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from: (A) the active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or (C) the independent action of a third party who is neither one of the Indemnified Parties nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them. CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified
Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 17 of 20
CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the
provisions of this Agreement. Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this Agreement are
contractual and the result of negotiation between the parties hereto. Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting Party, shall not be employed in the interpretation of this Agreement.
CONSULTANT is indemnified in OC SAN’s standard construction contracts. This indemnification is in the General Conditions which are attached to OC SAN’s standard construction contracts when these contracts are issued.
26. DUTY TO DEFEND
The duty to defend hereunder is wholly independent of and separate from the duty to indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code section 2782.8. Such defense
obligation shall arise immediately upon presentation of a Claim by any person if, without regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being
provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In
the event a final judgment, arbitration, award, order, settlement, or other final resolution expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims. CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this Agreement until such time as action against the Indemnified
Parties for such matter indemnified hereunder is fully and finally barred by the applicable statute of limitations.
27. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES
CONSULTANT shall comply with all OC SAN policies and procedures, including, but not limited to, the Contractor Safety Standards, as applicable, and Human Resources Policies, all as may be amended from time to time.
28. CLOSEOUT
When OC SAN determines that all work authorized under the Agreement is fully complete and that OC SAN requires no further work from CONSULTANT, or the Agreement is otherwise terminated or expires in accordance with the terms of the
Agreement, OC SAN shall give the CONSULTANT written notice that the Agreement will be closed out. CONSULTANT shall submit all outstanding billings, work submittals, deliverables, reports or similarly related documents as required under the Agreement
within thirty (30) days of receipt of notice of Agreement closeout.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 18 of 20
Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit
of the Agreement and will either: i. Give the CONSULTANT a final Agreement Acceptance: or
ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in the Agreement. Such support must be provided within the timeframe requested by OC SAN. Notwithstanding the final Agreement acceptance, the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to complete any portions of the work, the non-completion of which were not disclosed to
OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise), and the CONSULTANT shall remain obligated under all those provisions of the Agreement which expressly or by their nature extend beyond and survive final
Agreement Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for
final Agreement Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or Agreement with, the CONSULTANT’s request for final Agreement Acceptance.
29. PROHIBITION
During the term of this Agreement, CONSULTANT and its Subconsultants may not propose on any engineering or construction-related projects advertised by or on behalf of OC SAN if such work presents actual or perceived conflict of interest with CONSULTANT’s assignments with OC SAN.
CONSULTANT and its Subconsultants shall promptly disclose to OC SAN when such conflict exists prior to participating in any work as advertised by OC SAN or on its behalf.
CONSULTANT and its Subconsultants acknowledge and agree that OC SAN’s
determination regarding such conflicts that may impact CONSULTANT’s and its Subconsultants’ ability to propose on the work as described herein shall be final and cannot be appealed.
30. ENTIRE AGREEMENT
This Agreement constitutes the entire understanding and agreement between the Parties and supersedes all previous negotiations between them pertaining to the subject
matter thereof.
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 19 of 20
IN WITNESS WHEREOF, this Agreement has been executed in the name of OC SAN and CONSULTANT by their respective duly authorized officers as of the day and year first written
above. CONSULTANT: JACOBS PROJECT MANAGEMENT CO. By _______________________________ _________________ Date __________________________________________________ Printed Name & Title ORANGE COUNTY SANITATION DISTRICT
By _______________________________ _________________ Christine Marick Date
Board Vice-Chairwoman By _______________________________ _________________ Kelly A. Lore Date Clerk of the Board By _______________________________ _________________ Kevin Work Date Purchasing & Contracts Manager
Attachments: Attachment “A” – Scope of Work Attachment “A1” – Rules of Engagement Attachment “B” – Not Used Attachment “C” – Not Attached Attachment “D” – Allowable Direct Costs
Attachment “E” – Fee Proposal Attachment “F” – Not Used Attachment “G” – Not Attached Attachment “H” – Not Used Attachment “I” – Not Used
PSA PSA2026-001 Revised 050625 Supplemental Engineering Services Jacobs Project Management Co. Page 20 of 20
Attachment “J” – Not Attached Attachment “K” – Not Used
Attachment “L” – Contractor Safety Standards Attachment “M” – Not Attached Attachment “N” – Not Attached
Attachment “O” – Not Attached Attachment “P” – Human Resources Policies DM:ms
ATTACHMENT “A”
SCOPE OF WORK
SCOPE OF WORK PSA2026-001
Page 1 of 12
ATTACHMENT "A"
SCOPE OF WORK
I. SUMMARY
The Orange County Sanitation District (OC SAN) is a special district responsible for wastewater
conveyance and treatment for Northern and Central Orange County, California. OC SAN is a
public agency that operates one of the largest wastewater facilities in the United States of
America. OC SAN is soliciting Proposals to provide Supplemental Engineering Services to
support its engineering projects, which includes large and small capital projects and
operationally funded repair projects.
II. BACKGROUND
OC SAN has budgeted for a 10-year $3.6 billion capital improvement program, the vast majority
of which is managed by the Engineering Department. OC SAN also has an active asset
management program which includes many repair projects that, due to their complexity, are
managed by its Engineering Department.
III. PROFESSIONAL SERVICES REQUIRED
The following descriptions cover the types of professional services OC SAN will require under
this Agreement. OC SAN will determine when specific services are required. The mechanisms
for requesting, reviewing, authorizing, and terminating services under this Agreement are
documented in Attachment "A1" - Rules of Engagement. As described in that attachment,
work assignments will fall into one of the following types:
• Task Authorizations. Task Authorizations have formal Scope of Work and the
CONSULTANT submits a proposal with a fee.
• Task Directives. Task Directives are typically smaller than Task Authorizations where
OC SAN provides a scope and a not-to-exceed fee amount that will be negotiated with
the CONSULTANT.
• Program Role Assignments. In Program Role Assignments, the CONSULTANT shall
provide an appropriately qualified and experienced professional to fulfill the project role
on a portfolio of projects.
OC SAN will authorize specific tasks to be completed by the CONSULTANT and will require the
CONSULTANT to provide staff to fill designated roles on specific projects or within the
Engineering Program, as described in Attachment “A1” – Rules of Engagement.
SCOPE OF WORK PSA2026-001
Page 2 of 12
IV. ENGINEERING DEPARTMENT ROLES AND RESPONSIBILITIES
Architecture
Design and oversee design by CONSULTANT’s of new building and tenant improvement
projects. Work with City Building/Planning Departments, Fire Departments, and other
regulatory agencies as a liaison on behalf of OC SAN to confirm projects comply with
permitting and code requirements.
Prepare more complex plan clarifications and changes in response to Contractor's request
for information during construction and verify that facilities constructed meet design
specifications and regulatory requirements.
Engineering - Construction Management
Construction management activities include the following:
• Perform a variety of work functions supporting the design and construction of
wastewater treatment and collection systems.
• Review construction documents including plans and specifications; interpret plans and
specifications for construction work performed by OC SAN's Contractors; review
submittals for material and equipment conformance to design specifications and plans;
ensure contractual compliance with plans, specifications, codes, and safety requirements;
verify that materials being incorporated into project are per specification and with
approved construction practices; and coordinate equipment isolations, shutdowns, and
equipment and process tie-ins.
• Prepare progress payments to the Contractor.
• Perform analysis of change orders; negotiate fair and reasonable costs for change
orders; and prepare change order documentation.
• Oversee the start-up of facilities and schedule staff training.
• Provide technical assistance and support to engineers and project managers.
• Prepare a variety of administrative and technical memos, letters, and correspondence.
• Perform constructability reviews.
• Maintain comprehensive contractual records and periodically monitor progress of all
goods and service agreements from inception through completion to enforce milestones,
deliverables, and post-contract warranties.
Engineering - Civil / Mechanical
Prepare CONSULTANT Scope of Work. Review proposals and assist OC SAN in the
CONSULTANTS’ selection process.
SCOPE OF WORK PSA2026-001
Page 3 of 12
Design or oversee design by CONSULTANT’s of sanitary sewers, sewer rehabilitation,
mechanical piping systems, wastewater treatment systems, reclaimed water systems, lift
stations, etc. including calculations. Lead design reviews to perform a comprehensive multi-
discipline design review on assigned projects. Prepare detailed drawings, technical
specifications, and calculations for in-house designs on small projects.
Respond to engineering bid questions and addenda. Perform construction support services,
respond to Contractor's request for information, review construction submittals and verify
that equipment meets design specifications, prepare design changes, review Contractor’s
requested design changes, and support startup and commissioning.
Engineering - Electrical
Provide electrical engineering services including design, design review, interdisciplinary
review of design documents, and construction support service for collections and
wastewater treatment plant facilities. Design and oversee design by CONSULTANT’s for
medium voltage and low voltage electrical distribution systems including switchgear, motor
control centers and standby power. Design includes single line diagrams, elementary
diagrams, motor control schematics, short circuit calculations, protective device coordination
studies, raceway/wire design, and hazardous area classification.
Perform construction support services, respond to Contractor's request for information,
review construction submittals and verify that equipment meets design specifications,
prepare design changes, review Contractor’s requested design changes, review
InterNational Electrical Testing Association (NETA) test results, and perform electrical
system startup and commissioning for standby power and low and medium-voltage systems.
Perform short circuit calculations and protective device coordination studies utilizing
Electrical Transient Analyzer Program (ETAP) software.
Engineering - Instrumentation and Control
Provide instrumentation and control engineering services including design, design review,
interdisciplinary review of design documents, construction support service, and
commissioning support for collections and wastewater treatment plant control systems.
Design and oversee design by CONSULTANT’s for process and instrumentation diagrams,
control strategies, control system network diagrams, control system input/output lists, control
panel drawings, and commissioning procedures.
Perform construction support services, respond to Contractor's request for information,
review construction submittals and verify that equipment meets design specifications,
prepare design changes, review Contractor’s requested design changes, and support
startup and commissioning.
SCOPE OF WORK PSA2026-001
Page 4 of 12
Engineering - Commissioning Coordinator
Provide technical leadership and management of the development of commissioning
procedures during design; review the proposed construction sequencing and commissioning
packages established during design; review finalized commissioning procedures during
construction; work closely and coordinate with the Contractor's commissioning coordinator;
provide oversight of the Contractor's commissioning and start-up process and coordinate
startups with operations and maintenance; coordinate OC SAN's inspection, control system
programming, and engineering resources to support the Contractor's commissioning
process; track outstanding commissioning items and support their resolution and work
closely with the Resident Engineer to provide commissioning status and notification of any
issues or concerns. The commissioning coordinator shall have knowledge in electrical,
instrumentation, control systems, and process control.
Engineering - Structural
Provide structural analysis as needed to recommend structural improvements to existing
facilities, analyze structural failures, and recommend repairs.
Design and oversee design by CONSULTANT’s of structural systems for collections and
wastewater facilities. Review proposals, technical memoranda, and designs prepared by
others and prepare engineering analysis. Prepare detailed drawings, technical
specifications, and calculations for in-house designs on small projects.
Perform construction support services, respond to Contractor’s requests for information,
review construction submittals and verify that equipment meets design specifications and
regulatory requirements, prepare more complex structural engineering design changes
during construction and review Contractor’s requested design changes.
Inspection
Various disciplines may need continuous construction inspection including Civil, Structural,
Pipeline, Mechanical, Electrical, and Instrumentation for rehabilitation and replacement of
collections and wastewater treatment plant facilities.
Inspection activities include the following:
• Provide construction inspection for plant and collection facilities construction work
performed by Contractors to confirm contractual compliance with plans, specifications,
codes, regulations, and OC SAN's safety standards.
• Prepare a variety of reports and documentation.
• Review construction documents including plans and specifications.
• Review construction submittals.
• Inspect plant and collection facilities construction work performed by Contractors.
SCOPE OF WORK PSA2026-001
Page 5 of 12
• Verify that materials being incorporated into project are per specification and with
approved construction practices.
• Coordinate equipment and process isolations, shutdowns, and tie-ins.
• Assist safety representatives with job hazard analysis.
• Observe Contractors work safety environment and compliance with OC SAN's safety
standards, Cal/OSHA, regulations, and traffic control requirements and work with
Contractor to establish and maintain a safe construction project for employees,
customers, and the public.
• Document and follow-up on actions regarding safety, traffic control plans, and working
practices.
• Assist in the maintenance of accurate as-built contract drawings.
• Verify Contractor as-built drawings are maintained and correct.
• Assist Resident Engineers on requests for information, field change orders, plan
clarifications, and plan changes.
• Review and approve final drawings for the preparation of record drawings.
• Prepare and maintain necessary construction inspection records and reports as a means
of formal documentation including daily inspection reports, photo-logs, field test results,
force account reports, extra work requests, project submittal files, and individual project
logs.
• Assist Resident Engineer in reviewing the Contractor’s monthly progress invoices.
• Attend construction meetings.
• Participate in commissioning.
• Perform field walks and develop punch lists.
• Work with Contractors, regulatory agencies, utilities, city officials, and the general public
throughout the construction project to coordinate work to be accomplished and ensure
the project is completed successfully with minimum impact on the public or OC SAN
facilities.
Project Management
Project management functions for major capital projects include developing schedules, cost
estimates, and staffing requirements; assembling and leading project teams; planning,
directing, and coordinating activities of projects to confirm that goals and objectives of
projects are accomplished on schedule and within prescribed budget; inspecting quality and
quantity of work; managing the selection of outside CONSULTANT’s; and preparing and
presenting reports and other necessary correspondence on assigned projects.
SCOPE OF WORK PSA2026-001
Page 6 of 12
Manage a project or group of projects through all six phases of the Engineering Project Life
Cycle including project development, preliminary design, design, construction and
installation, commissioning, and closeout.
Manage, direct, and coordinate activities of the project team to confirm the project
progresses on schedule within prescribed budget and with acceptable quality. Confer with
project team to provide technical advice and resolve problems and conduct project team
meetings to confirm adequate communication of project status.
Perform periodic review of assigned work to confirm that the work is satisfactory and is
completed according to plan.
Interface with senior management, peers, project staff, CONSULTANT’s, customers, and
users as necessary to coordinate project execution and inform stakeholders of project status
and possible outcomes.
Prepare project reports for the Board of Directors, management, and others and make
presentations as necessary.
Provide project management oversight of the selection process of outside CONSULTANT’s;
oversee the bid, proposal, and selection/purchase recommendation process for major
capital projects; solicit proposals; review proposals; assist OC SAN's evaluation teams with
selection of CONSULTANT’s; negotiate the fee; and establish schedules and performance
criteria.
Work with CONSULTANT’s on project planning, preparation, scheduling, and execution of
contracts and ensure work is completed on time and in conformance with plans and
specifications.
Apply project management tools as required to address the financial aspects and impacts of
project variables such as delays to the project schedule and changes to the project scope.
Serve as a liaison for the Engineering Department with other OC SAN departments,
divisions, and outside agencies and provide project representation to commissions,
committees, and task forces.
Support - Administrative
Administrative support activities include the following:
• Perform a variety of secretarial, advanced clerical, and routine administrative and
programmatic work in support of assigned projects or programs, division, or department.
• Participate in the administration of approved policies and procedures.
• Prepare financial analysis and a variety of reports as required.
• Provide information and assistance to other assigned project or program staff regarding
assigned programs, policies, and procedures.
SCOPE OF WORK PSA2026-001
Page 7 of 12
Support - Submittals
Submittals support activities include the following:
• Coordinates the submittal review process between Contractors and OC SAN staff.
• Reviews submittals to determine compliance with the submittal submission processes.
• Consolidates submittal comments for final review.
• Finalizes and distributes facilities records.
Support - Cost Estimating
Cost estimating activities include the following:
• Prepare cost estimates to provide detailed information regarding quantity and cost of
materials and labor.
• Develop processes and/or techniques that provide clear and standard estimating
methods across projects.
• Provide data for analytical comparisons between projects.
• Review project cost estimates as projects advance through the design process.
• Review engineering plans and specifications to determine materials and quantities
required by project specifications.
• Recommend cost saving changes.
• Review cost estimates and change orders submitted by construction Contractors and
provide recommendations.
• Prepare general budget estimates for new projects.
Estimating shall include all disciplines including architectural, civil, structural, mechanical,
plumbing, heating and air conditioning, fire protection, electrical, and control systems.
Support - Construction Scheduling
Perform a variety of scheduling reviews and analyses involving wastewater treatment and
collection systems, including the following activities:
• Review design submittals prior to bid to confirm scope is achievable in the time
stipulated.
• Establish clear specifications and enforcement provisions with the Contractors by
placing schedule performance and proof of impact on the Contractors.
• Review construction Contractor's schedules for effective Contractor performance.
Identify changes to the critical path.
• Review baseline schedule submittals.
SCOPE OF WORK PSA2026-001
Page 8 of 12
• Support the Resident Engineer and Project Manager during scheduling meetings so they
are effective and productive.
• Maintain careful documentation of all schedule submittals so that any requests for time
adjustments can be measured against the approved schedule in place at the time of
impact is claimed.
• Monitor actual progress versus planned progress. Provide exception reporting and
recommend actions.
• Perform analysis of change orders such as time impact analysis (TIA) and productivity
claims.
Support - Construction Claims / Mitigation
Prepare detailed analysis of Contractor-submitted requests for change, delay claims, TIAs,
and/or government code claims including productivity loss claims, claims for differing site
conditions, and/or total cost claims. Work may include analysis of liability, review of contract
language and supporting documents, validating extended overhead costs, and review and
analysis of any other supporting documentation.
Work may also include a proactive strategy to reduce exposure, review of reporting
requirements and practices, and conferring with project teams and/or managers to
effectively implement practices to reduce liability and/or risk.
Support - Computer Aided Design Drafting and Design
Computer Aided Design (CAD) drafting and design support include the following activities:
• Use CAD equipment to provide support to Engineers by preparing layouts, detail
drawings, sketches, and diagrams. Drawings are to include all views and dimensions
necessary for construction of wastewater treatment and collection systems. Work must
comply with OC SAN CAD Manual.
• Draft engineering drawings of proposed wastewater treatment facility construction
projects from engineer's design drawings including structures and notations and review
maps and existing drawings to determine utility locations, elevations, and other related
information.
• Consolidate changes made on drawings by CONSULTANT’s, engineers and inspectors
with Contractor's as-built drawings to draft final record drawings on a wide variety of
wastewater treatment facility construction projects.
• Conduct field visits to confirm existing conditions and finished construction configuration.
• Make appropriate notes of sizes, diameters, locations, and other significant information
and return to project engineer.
• Provide technical assistance and support to engineers and engineering aides.
SCOPE OF WORK PSA2026-001
Page 9 of 12
Support - Outreach
Provide community and stakeholder outreach support for OC SAN projects during design
and construction phases. Work may include the following activities:
• Develop outreach plans, schedules, and budgets identifying project areas, community
concerns, community events, demographics, and language needs.
• Identify stakeholders and communication strategies, including property owners, tenants,
businesses, schools, and public officials.
• Plan, organize, and staff public meetings, including presentation development and
meeting summaries.
• Conduct door-to-door or neighborhood outreach to impacted residents and businesses.
• Develop and design outreach materials such as fact sheets, notifications, press
releases, website updates, and social media content consistent with OC SAN branding.
• Develop and implement crisis communication plans.
V. LOGISTICS AND CONTRACT MANAGEMENT
Work Location
CONSULTANT's on-site staff shall work from at OC SAN's facilities in Fountain Valley or
Huntington Beach, California. At times, work may be required at other OC SAN facilities or
at job site locations away from OC SAN facilities. At the CONSULTANT's discretion and
concurrence with the OC SAN representative, the assigned CONSULTANT staff may be
located at CONSULTANT's home office. Advanced coordination with OC SAN may be
required for CONSULTANT staff working at OC SAN facilities on OC SAN holidays.
Point of Contact/Supervision
CONSULTANT shall designate an individual as the single point of contact to direct efforts in
fulfilling contracted obligations under this Agreement. The selected designee shall be
responsible for the direct supervision of assigned staff, including such activities as directing
work, work schedules, quality of work performed, technical oversight, vacation requests,
discipline, etc. The selected designee shall not be changed without prior written notification
to the OC SAN representative.
CONSULTANT shall be responsible for supervision of its entire staff, including the
requirements defined in Attachment "A1" - Rules of Engagement.
SCOPE OF WORK PSA2026-001
Page 10 of 12
OC SAN Project Document Management
CONSULTANT's staff assigned to work on OC SAN projects shall save project related
deliverables, documents, and/or records in OC SAN accessible locations (i.e., OC SAN
SharePoint servers and/or OC SAN licensed cloud-based applications such as Bluebeam,
PMWeb or One Drive) as applicable to the project assignment to comply with Public
Records Act requirements. Accessibility to these locations will be provided by OC SAN.
Provided Facilities & Equipment
OC SAN shall provide the following for CONSULTANT's on-site staff:
• Furnished office space at OC SAN
• Computers, software, network, and printing capabilities
• Office telephone
Personal Protective Equipment
CONSULTANT staff assigned to OC SAN facilities may be exposed to known plant process
and work hazards and therefore shall have appropriate Personal Protective Equipment
(PPE) such as: eye and face protection (safety glasses), head protection (hard hat), hand
protection (gloves), foot protection (safety toed shoes), high visibility clothing (Class 3
vests), hearing protection, personal gas monitor (4 gas), fall protection (harness and
lanyard), and other forms of PPE. CONSULTANT shall provide all equipment and training
necessary to comply with OC SAN safety polices. Refer to Attachment "L" - Contractor
Safety Standards.
Time Tracking & Invoicing
CONSULTANT shall submit invoices, including cost and hours, monthly. Invoice shall be
submitted no later than the 15th of each month. OC SAN maintains a project controls
system containing detailed cost and hours information for all Engineering Projects. The
format for reporting hours shall be in an importable format such as Microsoft Excel and
contain, at a minimum, the following items:
Column Description
Project Number OC SAN shall provide a list of project numbers. These numbers
are subject to change as new projects are added, and existing
projects are completed.
Work Package
Number
OC SAN shall provide a list of work package numbers. The work
package numbers are subject to change as a project transitions
from one phase to the next.
Employee ID Each employee included in the hours report must contain a unique
identification number.
Employee Name Employee name.
SCOPE OF WORK PSA2026-001
Page 11 of 12
Work Date The week ending date when work was performed.
Hours by Week The total number of hours worked for the week. In addition, it may
be necessary to report overtime hours which will require a
separate report.
Total Burdened Cost The total burdened cost shall include actual salary, fringe costs,
overhead, and profit by person.
Work Quality
CONSULTANT shall be responsible for the professional quality and technical competence of
assigned staff supplied to OC SAN. Additionally, the firm shall be responsible for the
coordination of all efforts and other services furnished under the Agreement.
Billing Guidance
The following guidance establishes which activities performed by CONSULTANT are
considered billable and non-billable under this Agreement.
Non-Billable Activities
The following activities are not billable to OC SAN:
• Proposal and staffing activities: Time spent identifying staff, preparing or submitting
proposal material, or negotiating budgets is considered marketing and is not billable.
• Pre-selection communications: Before OC SAN selects a firm for a request, any
clarifications, questions, or discussions should be directed to the designated Submitter.
CONSULTANT shall not consult directly with OC SAN staff outside of the Submitter.
Any such time is non-billable.
• General training: Technical training is not billable except for training specific to OC SAN
requirements, procedures, or standards.
• Internal performance management: Time spent addressing or documenting performance
issues of assigned staff is not billable.
• Other OC SAN-unrequested activities: Any tasks performed without a formal request or
outside of authorized Scope of Work, task directives, or task authorizations are non-
billable.
Billable Activities
The following activities are generally billable to OC SAN:
• Preparing and submitting invoices.
• Managing the CONSULTANT’s internal billing codes.
• Preparing progress reports for assigned tasks.
• Providing technical guidance and oversight to assigned staff.
• Managing task directives and task authorizations.
• Performing quality control for task directives and task authorizations.
SCOPE OF WORK PSA2026-001
Page 12 of 12
• Attending regular coordination meetings with OC SAN Management.
• Training CONSULTANT staff on OC SAN-specific requirements, procedures, and
standards.
Program-level support activities, rather than project-specific work, shall be billed to Project
SP-195, Work Package 3210.
Management of Resource Assignments
OC SAN will maintain a cloud-based workflow tool to request, review, authorize, and close
resource assignments. That workflow tool is currently PMWeb. CONSULTANT's Point of
Contact shall utilize this tool to track all requests through their life cycles. OC SAN will use
this workflow tool to verify that any invoiced costs have been duly approved through the
workflow tool.
ATTACHMENT “A1”
RULES OF ENGAGEMENT
Rules of Engagement PSA2026-001
Page 1 of 4
ATTACHMENT “A1”
RULES OF ENGAGEMENT
This document describes how OC SAN may use a Supplemental Engineering Services
agreement to maintain the Engineering Project program while complying with
independent Contractor classification laws.
There are three mechanisms by which professional services can be supplied through
the Agreement:
• Task Authorizations
• Task Directives
• Program Role Assignments
These Rules of Engagement are intended to document how services are to be
requested, authorized, and managed.
Task Authorizations
When OC SAN requires a specific task completed, staff will contact each firm.
Depending on the nature of the task, OC SAN may request that each firm respond with
the proposed team, fee, and, if applicable, an approach to perform the work. Based on
these responses, OC SAN will determine which firm offers the most qualified and
appropriate team and/or approach and negotiate a Task Authorization with that firm.
Task Authorizations have a formal Scope of Work and a fixed upper limit.
Distinguishing aspects of Task Authorizations include the following:
• Requests for Task Authorization Proposal (RFTAP) require a Scope of Work
prepared by OC SAN staff.
• RFTAPs and Task Authorizations must be approved by the Director of
Engineering.
• The Scope of Work must include schedule requirements, tasks, deliverables, and
assumptions, similar in detail to a Design or Planning Study Task Order.
• Each Task Authorization must specify a firm, negotiated upper limit which may
not be exceeded. Any changes must be processed as a formal Task
Authorization Amendment before the work is performed.
• The CONSULTANT shall report incurred costs for the Task Authorization on their
monthly invoices, including total costs to date and the remaining budget.
• Time charged to Task Authorizations does not count against approved Program
Role hours.
Task Directives
Task Directives are typically smaller than Task Authorizations where OC SAN provides
a Scope of Work and a not-to-exceed fee amount that will be negotiated with the
CONSULTANT. Task Directives include the following:
Rules of Engagement PSA2026-001
Page 2 of 4
• The Scope of Work may be less detailed than what is required for a Task
Authorization.
• A schedule for completing the work should generally be specified, but it is not
always required.
• Task Directive must specify a firm negotiated upper limit which may not be
exceeded. If changes require a revision to that upper limit, it must be processed
as a formal Task Directive Amendment prior to the work being authorized and
performed.
• CONSULTANT shall report costs incurred for the Task Directive on their monthly
invoices, including total costs to date and the remaining budget.
Program Role Assignments
Program Role assignments direct the CONSULTANT to assign a qualified individual to
fill a specific role across multiple projects. For inspection staff, where assignments and
timing may vary from day to day to support the workload demand with construction
projects, the CONSULTANT shall designate a dispatcher who coordinates assignments
and schedules with OC SAN’s Inspection Supervisor. The dispatcher may be the
CONSULTANT’s Point of Contact, an assigned inspector, or another appropriate
representative.
Requirement for Program Roles:
• OC SAN will contact all firms eligible to provide professionals for the role.
• Assignment, duration, and budget:
o They are specific to one person.
o Assignments will generally be made before the specific need arises.
o Hours and costs will be tracked at the Program Role, project, and work
package level. An authorized budget will be established based on the
individual’s burdened rate and the duration of the assignment. The
individual’s location (Home Office or Site) impacts the billing overhead
rate. The burdened rate includes salary, overhead, and profit.
Reimbursable expenses, typical for travel or vehicle use, will also be
tracked.
o They are assigned for a specified duration. At the end of the specified
duration, the Program Role will either be closed or renewed.
o On-site Program Roles will be provided office space, key cards, an OC
SAN phone extension, an OC SAN email, and network access.
• Selection factors: The assignment will go to the firm that offers the professional
who is the best fit for the Program Role. Depending on the role, OC SAN may
consider:
o Relevant experience and expertise.
o Availability to begin work (for example, full-time availability if the role starts
immediately).
o On-site presence and proximity to OC SAN facilities.
o Cost-effectiveness when multiple qualified candidates are available.
Rules of Engagement PSA2026-001
Page 3 of 4
• The Engineering Manager responsible for the function must approve Program
Role assignments. Only supervisors or managers may initiate Program Role
requests.
Project assignments are made under the Program Role to direct the CONSULTANT to
assign qualified individuals to specific projects. A project assignment may cover the full
project role or a defined portion.
Standard project assignments are listed below:
• Administrative Support
• Construction Scheduling
• Electrical Engineer
• Cost Estimator
• Outreach Support
• Instrumentation and Control (I&C) Engineer
• Commissioning Coordinator
• Inspection - Civil/Mechanical
• Inspection - Electrical/I&C
• Project Engineer
• Project Manager
• Resident Engineer
• Submittals
• Project Support (structural, HVAC, constructability, etc.)
Requirements for project assignments:
• Assignments will be made from existing Program Role assignments.
• Timing and duration depend on the project schedule or other designations.
• CONSULTANT assigned to a project will work directly with OC SAN or project
team members.
• Assignment requests must specify total estimated hours.
• CONSULTANT shall identify a Technical Lead to support assigned
CONSULTANT staff.
• Project direction will come from the CONSULTANT Point of Contact or
CONSULTANT Supervision, in coordination with OC SAN Project Team and
Supervision in Engineering.
CONSULTANT Staff Supervision
CONSULTANT is responsible for supervision of its entire staff, including the following:
• Administrative Supervision (CONSULTANT staff only)
o Performance reviews
o Timecard approvals
o Work hours
• Supervision of assigned roles
Rules of Engagement PSA2026-001
Page 4 of 4
o Work prioritization
o Technical input, guidance, and direction
o Quality Control for assigned deliverables
OC SAN does not supervise CONSULTANT staff. However, OC SAN provides
direction to CONSULTANT as an Owner, including:
• Project decisions and priorities
• Design standards
• OC SAN preferences
• Financial and risk considerations
• Compliance with OC SAN Policies and Procedures
• Coordination with other OC SAN projects and activities
6/23/2026
1
Supplemental Engineering Services,
Contract No. PSA2026-001
Presented by:
Martin Dix
Engineering Manager
Operations Committee
July 1, 2026
2
Supplemental Engineering Services (SES)
Provides flexibility and engineering services to:
Deliver the CIP
Project management, project
engineering, resident
engineering, inspection and
construction support
Fill gaps and peaks
Support workload surges,
temporary vacancies, and
transition periods
Add expertise
Constructability, value
engineering, structural,
estimating, scheduling, claims,
outreach
1
2
6/23/2026
2
2002-
2012
2012-
2017
2017-
2022
2022-
2027
2026-
2031
SES History
3
2002-
2012
2012-
2017
2017-
2022
2022-
2027
2026-
2031
SES History
4
$59.4M
3
4
6/23/2026
3
2002-
2012
2012-
2017
2017-
2022
2022-
2027
2026-
2031
SES History
5
$59.4M $55.8M
$0
$50
$100
$150
$200
$250
$300
0
10
20
30
40
50
60
FY12-13 FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-25
AECOM Enterprise Automation Jacobs Rockwell Automation CIP Cash Flow
SES Staffing Levels
6
#
o
f
s
t
a
f
f
Mil
l
i
o
n
s
5
6
6/23/2026
4
$-
$100
$200
$300
$400
$500
$600
26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 44-45 45-46
Mi
l
l
i
o
n
s
Fiscal Year
Adopted 3.5% Esc Ref Line 7
20-Year Spending: $8.3B
8
72 72 72 72 72 72 72
2 12 23 30 33 33 33
54 45 32 28 19 28 20
128 129 127 130 124
133
125
0
20
40
60
80
100
120
140
25-26 26-27 27-28 28-29 29-30 30-31 31-32
St
a
f
f
C
o
u
n
t
Fiscal Year
OC San Base Staffing New OC San Staffing Required SES Staffing SES + New Staff
Required SES Staffing
7
8
6/23/2026
5
9
72 72 72 72 72 72 72
2 12 23 30 33 33 33
54 45 32 28 19 28 20
128 129 127 130 124
133
125
0
20
40
60
80
100
120
140
25-26 26-27 27-28 28-29 29-30 30-31 31-32
St
a
f
f
C
o
u
n
t
Fiscal Year
OC San Base Staffing New OC San Staffing Required SES Staffing SES + New Staff
Required SES Staffing
10
Selection Process
Key Attributes—Jacobs
•Exceptional staff
•Effective approach for managing resource requests
•Highly effective on current contract
Key Attributes—AECOM
•Deep bench of professionals
•Experience with similar contracts
•Good approach for staff supervision
Proposal ScoreFirm
95Jacobs Project Management Co.
78AECOM Technical Services, Inc.
70Hazen and Sawyer
9
10
6/23/2026
6
Recommend to the Board of Directors to:
A. Approve Professional Services Agreements to provide SupplementalEngineering Services, Contract No. PSA2026-001, for a three-year periodwith two one-year renewal options, for a combined total amount not toexceed $55,800,000, initially allocated as follows:
•AECOM Technical Services, Inc. – $27,900,000
•Jacobs Project Management Co. – $27,900,000; and
B. Authorize the General Manager to transfer funds between the twoProfessional Services Agreements, as needed, to align contract budgets with
actual workload distribution, with no increase to the total Board-authorized
amount.
Recommendation
11
11
ADMINISTRATION COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5015 Agenda Date:7/22/2026 Agenda Item No:10.
FROM:Robert Thompson, General Manager
Originator: Wally Ritchie, Director of Finance
SUBJECT:
RENEW NUTANIX SOFTWARE SUBSCRIPTION, SPECIFICATION NO. S-2026-731BD
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve a Purchase Order Contract to Saitech Inc. for the Purchase of Nutanix Software,
Specification No. S-2026-731BD, for a total amount not to exceed $428,173; and
B. Approve a contingency of $42,817 (10%).
BACKGROUND
Nutanix is a solution that consolidates computing and storage on the same physical hardware.It has
been used to host infrastructure systems for both Office and Industrial Control Systems (ICS)
computing environments.
The current software subscription for the ICS environment will expire in August 2026.This renewal is
for the ICS environment only,for a period of one (1)year,to allow us to transition to a different
platform.
RELEVANT STANDARDS
·24/7/365 treatment plant reliability
·Ensure the public’s money is wisely spent
·Maintain a culture of improving efficiency to reduce the cost to provide the current service level
or standard
·Protect OC San assets
PROBLEM
The current Nutanix Software Subscription expires in August 2026.A lapse in coverage could impact
the ICS computing environment.
Orange County Sanitation District Printed on 7/13/2026Page 1 of 3
powered by Legistar™
File #:2026-5015 Agenda Date:7/22/2026 Agenda Item No:10.
PROPOSED SOLUTION
Renew the Nutanix Software Subscription for the Industrial Control Systems (ICS) Environment.
TIMING CONCERNS
Renewing the Nutanix Software Subscription is imperative for the uninterrupted support and safety of
plant operations.
RAMIFICATIONS OF NOT TAKING ACTION
A decision not to renew Nutanix Software Subscription would mean the solution would no longer be
supported, security patches could not be applied, and the product could not be used legally.
PRIOR COMMITTEE/BOARD ACTIONS
March 2022 -Approved a Purchase Order to ePlus Technology,Inc.for the purchase of software,
hardware,and services to implement and configure the Nutanix metro clusters for Plant No.1
Industrial Control System,Specification No.E-2022-1300BD,for a total amount not to exceed
$560,195,plus applicable sales tax and shipping;and approved a contingency in the amount of
$56,019 (10%).
July 2021 -Approved a Purchase Order to ePlus Technology Inc.for Specification No.E-2021-
1253BD for IT Server Hardware for Outfall Low Flow Pump Station,Contract No.J-117B,for a total
amount of $793,882.96, plus applicable sales tax and freight.
ADDITIONAL INFORMATION
An invitation for bids was issued on May 7,2026,via OpenGov.Bids were due on June 1,2026.OC
San received four (4) bids, which are valid for 180 calendar days from the bid opening date.
The following is a list of the firms who submitted a bid:
Company Name Bid Determination
Saitech Inc $428,172.80 Responsive / Responsible
ePlus Technology $431,474.56 Responsive / Responsible
Questivity $441,774.08 Responsive / Responsible
Rigel Networks LLC $563,200.00 Non-Responsive / Non-Responsible
A requirement of this Invitation for Bids was that vendors be authorized Nutanix resellers.Rigel
Networks LLC was determined not to meet this requirement.
Based on these results,staff recommends approving a Purchase Order Contract with Saitech Inc.
The term of this Purchase Order Contract will begin upon effective date of the Notice to Proceed.
Orange County Sanitation District Printed on 7/13/2026Page 2 of 3
powered by Legistar™
File #:2026-5015 Agenda Date:7/22/2026 Agenda Item No:10.
CEQA
N/A
FINANCIAL CONSIDERATIONS
This request complies with the authority levels of the Orange County Sanitation District's Purchasing
Ordinance.This item has been budgeted (FY 2026-27 &2027-28 Budget,Section 6,Page 24,
Repairs & Maintenance) and the budget is sufficient for the recommended action.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
N/A
Orange County Sanitation District Printed on 7/13/2026Page 3 of 3
powered by Legistar™
ADMINISTRATION COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11.
FROM:Robert Thompson, General Manager
Originator: Laura Maravilla, Director of Human Resources
SUBJECT:
2027 BENEFITS INSURANCE RENEWAL
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve the Orange County Sanitation District 2027 Benefits Insurance Renewal with the
carriers listed below for an overall not-to-exceed amount of $21,321,535 as specified below:
1.Benefit Coordinators Company (BCC) (medical, dental, vision plans, and Employee
Assistance Program [EAP]) - Not to Exceed $18,721,669;
2.Lincoln Financial (basic life, short- and long-term disability) - Not to Exceed $551,619;
3.Lincoln Financial (EMT & Manager disability) - Not to Exceed $36,000;
4.HealthEquity (Health Savings Accounts [HSA]) - Not to Exceed $55,386;
5.Voya (Health Reimbursement Arrangement [HRA]) - Not to Exceed $217,980;
6.WEX (Flexible Spending Accounts [FSA]) - Not to Exceed $11,606;
7.BCC (retiree-paid health premiums, recouped from retirees through monthly payments) - Not
to Exceed $711,964;
8.Approve a contingency of $1,015,311 (5%); and
B. Authorize the General Manager to revise the carriers within the not-to-exceed amounts listed
above for operational efficiency and/or to better meet the needs of the Orange County
Sanitation District and participants.
BACKGROUND
The Orange County Sanitation District (OC San)provides healthcare and welfare insurance benefits
(plans)to employees and eligible dependents in accordance with collective bargaining agreements,
personnel policies and adopted resolutions.
OC San’s benefit plans are renewed annually on January 1.Human Resources (HR)manages OC
San’s benefits program.OC San’s benefits broker,Alliant,evaluates market conditions,negotiates
with insurance carriers,and secures the most cost-effective coverage for participants.The planning
Orange County Sanitation District Printed on 7/13/2026Page 1 of 5
powered by Legistar™
File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11.
process starts in April and insurance contracts are finalized and signed in August.
The total cost of insurance coverage for the 2027 Plan Year will be $20,306,224,an overall increase
of $1,850,634 or 10%.By comparison,annual increases were 10.5%in 2024,4.4%in 2025,and
12.8% in 2026.
This year’s renewal costs are being driven by several industry-wide factors, including:
·Increased use of advanced medical technologies and treatment options
·Growth in specialty pharmaceuticals, including cancer therapies and GLP-1 medications
·Rising rates of chronic health conditions and obesity, resulting in greater healthcare utilization
·Increasing high-cost claims and medical inflation
Despite these market pressures,OC San continues to implement strategies to manage healthcare
costs.These efforts include participation in the Public Risk Innovation,Solutions,and Management
(PRISM)insurance risk pool,ongoing review of utilization trends,plan design changes,bundled
insurance coverages,and competitively shopping options and negotiating rate guarantees.In
response to rising medical costs,PRISM’s Board has explored and proactively examined multiple
cost-containment strategies and remains committed to monitoring evolving research,market trends,
and best practices to support long-term sustainability of member agencies’ health plans.
Since joining PRISM in 2015,OC San has benefited from favorable insurance renewal results.From
2017 through 2026,average annual renewal increases were 4.33%for Kaiser plans,4.36%for
Anthem HMO plans,and 3.52%for Anthem PPO/HDHP plans.The overall average increase for the
PRISM pool during this period was 5.64%.
Employees share in the cost of medical and dental insurance in accordance with current collective
bargaining agreements.For medical insurance coverage,employees contribute 20%of the premium
costs,with the exception of those enrolled in employee only HMO coverage who contribute 10%of
the premium cost.OC San covers the cost of all other lines of coverage including vision,basic life,
disability, EAP, HAS, and HRA.
Retirees may continue OC San medical and/or dental coverage by paying 100%of applicable
premiums.OC San incorporates the cost of this item in the insurance renewal costs,as it is paid in
advance, and reimbursed by the retiree through monthly payments.
A legacy retiree medical benefit remains in place for employees hired before July 1,1988,providing
2.5 months of OC San-paid medical insurance for each year of continuous service upon retirement.
Currently, 5 retirees receive this benefit, and no active employees are eligible to qualify in the future.
RELEVANT STANDARDS
·Offer competitive compensation and benefits
·Comply with OC San Policy 4.1 - Insurance
PROBLEM
OC San has a contractual obligation to provide health and welfare benefits to employees and eligible
Orange County Sanitation District Printed on 7/13/2026Page 2 of 5
powered by Legistar™
File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11.
dependents. Current insurance coverage expires December 31, 2026.
PROPOSED SOLUTION
Approve the benefits insurance renewal with the respective carriers and the contingency,as
described above, to ensure continued coverage for employees and eligible dependents.
TIMING CONCERNS
Board approval will ensure OC San meets the associated deadlines to finalize insurance contracts in
August for continued health insurance coverage.
RAMIFICATIONS OF NOT TAKING ACTION
Without Board approval,OC San cannot finalize insurance contracts,resulting in a lapse of health
and welfare benefits for employees and eligible dependents,and noncompliance with collective
bargaining agreements, personnel policies, and adopted resolutions.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
PRISM Risk Sharing Pool
The membership with PRISM,which was approved by the Board of Directors in May 2015,has
resulted in cost-effective health insurance coverage for OC San by leveraging volume as we are part
of a risk-sharing pool comprised of public entities.
Medical Insurance
OC San offers a choice of medical plans through Anthem Blue Cross and Kaiser Permanente.
HMO (Health Maintenance Organization)plans offer comprehensive coverage.Employees have a
choice between the Anthem Blue Cross HMO or the Kaiser HMO plan.The PPO (Preferred Provider
Organization)plan through Anthem Blue Cross offers a network of doctors and healthcare facilities
that provide services to plan members at special discounted rates.OC San also offers two high-
deductible plans to eligible employees:a high-deductible HMO plan through Kaiser and a high-
deductible PPO plan through Anthem Blue Cross.
Dental Insurance
OC San provides the Delta Dental plan to all benefit eligible employees.
Vision Insurance
OC San provides vision insurance to all benefit eligible employees through Vision Service Plan
(VSP).
Basic Life Insurance
Life insurance provides protection for an employee’s beneficiary in the event of death.All benefit
eligible full-time and part-time employees automatically receive Basic Life and Accidental Death &Orange County Sanitation District Printed on 7/13/2026Page 3 of 5
powered by Legistar™
File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11.
eligible full-time and part-time employees automatically receive Basic Life and Accidental Death &
Dismemberment insurance coverage.The benefit amount is up to $50,000 for employees,and three
times salary for managers and executives. Coverage is currently offered by Lincoln Financial.
Short-Term Disability Insurance
The short-term disability insurance plan provides income protection on a temporary basis for
employees who are unable to work due to a non-work-related illness or injury.Under the plan,
income benefits may be received for up to 26 weeks.OC San pays the entire cost of coverage for
regular full-time and part-time employees. Coverage is currently offered by Lincoln Financial.
Long-Term Disability Insurance
The long-term disability insurance plan provides income protection for an extended period for
employees who are unable to work due to a non-work-related illness or injury.Under the plan,
employees who are disabled for more than 90 days are eligible to receive a benefit of 67%of their
basic monthly pay,up to $5,000/month.OC San pays the entire cost of coverage for regular full-time
and part-time employees with five or more years of service.Coverage is currently offered by Lincoln
Financial.
Executive Disability
This is a supplemental long-term disability insurance plan,which provides increased income
protection for executives and managers.Under the plan,eligible employees who are disabled for
more than 90 days due to a non-work-related illness or injury are eligible to receive an additional
benefit of $3,100/month.The first $5,000/month is covered by the OC San group long-term disability
plan benefit. Coverage is offered through The Standard.
Health Savings Account
Eligible employees who elect the Anthem High-Deductible Health Plan (HDHP)are simultaneously
enrolled in a Health Savings Account (HSA)which is governed by IRS rules and provides a tax-
favorable method for employees to contribute and withdraw funds for qualified health-related
expenses.In accordance with collective bargaining agreements,OC San currently makes an annual
contribution to the HSA based on the increased deductible and the savings generated by employees
electing the HDHP plan compared to the PPO plan. Coverage is offered through HealthEquity.
Health Reimbursement Arrangement
Eligibility for enrollment in a Health Reimbursement Arrangement (HRA)is based on employee group
affiliation,and only a subset of OC San’s employee groups participates.This plan provides
participants and eligible dependents with individual accounts for reimbursement of qualified medical
expenses during retirement or following separation from OC San.OC San covers administrative
costs up to $30 per participant per year and makes a monthly contribution to employee accounts
based on the agreed upon terms outlined in a collective bargaining agreement or Resolution.
Coverage is offered through BPAS/Voya.
Flexible Spending Accounts
Flexible Spending Accounts (FSAs)allow employees to set aside funds on a pre-tax basis to pay for
qualified healthcare and/or dependent care expenses during a particular plan year.OC San offers
Healthcare, Dependent Care, and Limited Purpose FSA accounts.
Orange County Sanitation District Printed on 7/13/2026Page 4 of 5
powered by Legistar™
File #:2026-5016 Agenda Date:7/22/2026 Agenda Item No:11.
Employee Assistance Program
The Employee Assistance Program (EAP)protects employees and family members when they need
help with personal problems such as marital and relationship problems;stress,anxiety,and
depression; grief and loss; or substance abuse. Coverage is offered through ComPsych.
CEQA
N/A
FINANCIAL CONSIDERATIONS
This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has
been budgeted (Budget FY 2026-27 and FY 2027-28,Section 5,Page 4,Operating Budget)and the
budget is sufficient for the recommended action.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
N/A
Orange County Sanitation District Printed on 7/13/2026Page 5 of 5
powered by Legistar™
ADMINISTRATION COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5017 Agenda Date:7/22/2026 Agenda Item No:12.
FROM:Robert Thompson, General Manager
Originator: Wally Ritchie, Director of Finance
SUBJECT:
RENEW VMWARE SOFTWARE ENTERPRISE LICENSE AGREEMENT,SPECIFICATION NO.S-
2026-732BD
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve a Purchase Order Contract to Nth Generation Computing, Inc.for the purchase of the
VMware Software Enterprise License Agreement (ELA) Subscription, Specification No. S-2026
-732BD, for a five (5)-year term, with a total amount not to exceed $3,565,600 plus applicable
sales tax; and
B. Approve a contingency in the amount of $356,560 (10%).
BACKGROUND
Orange County Sanitation District’s (OC San)current VMware Enterprise License Agreement (ELA)
is ending in August 2026.VMware is used at OC San for server and desktop virtualization in both
Office and Industrial Control System computing environments.Virtualization is a technology that
creates virtual representations of servers,storage,networks,and other physical machines.It
provides high availability and resiliency, increases efficiency, and reduces expenses.
This purchase order contract represents a significant increase in cost over the prior period.The
VMware product was purchased by Broadcom which packaged the product differently and raised the
price for the more complete product offering.The competitors in this product space matched this
product packaging strategy.In response OC San has chosen VMware for both virtualization and
related storage management as it is still the most cost-effective solution.
RELEVANT STANDARDS
·24/7/365 treatment plant reliability
·Ensure the public’s money is wisely spent
·Maintain a culture of improving efficiency to reduce the cost to provide the current service level
or standard
·Protect OC San assets
Orange County Sanitation District Printed on 7/13/2026Page 1 of 3
powered by Legistar™
File #:2026-5017 Agenda Date:7/22/2026 Agenda Item No:12.
PROBLEM
The current VMware ELA expires in August 2026.A lapse in coverage could impact OC San’s
production computing environment.
PROPOSED SOLUTION
Renew the VMware Enterprise License Agreement Subscription.
TIMING CONCERNS
Renewal of VMware ELA is imperative for the continued uninterrupted support and safety of plant
operations.
RAMIFICATIONS OF NOT TAKING ACTION
A decision not to renew the VMware ELA means the solution would no longer be supported,security
patches could not be applied, and VMware products could not be used legally.
PRIOR COMMITTEE/BOARD ACTIONS
July 2023 -Approved a Purchase Order to Nth Generation Computing,Inc.for the purchase of the
VMWare Enterprise License Agreement (ELA)Subscription Upgrade and Renewal for a three (3)
year term using the NASPO ValuePoint Master Agreement No.AR2472,California Contract #7-17-
70-40-05,for a total amount not to exceed $574,585 plus applicable sales tax;and Approved a
contingency in the amount of $57,458 (10%).
July 2018 -Authorized a Purchase Order Contract with Nth Generation Computing,Inc.for VMware
Licenses and Support,Specification Number S-2018-954BD-R,for a total amount not to exceed
$595,272; and Approved a contingency of $59,527 (10%).
ADDITIONAL INFORMATION
An invitation for bids was issued on May 7,2026,via OpenGov.Bids were due on June 1,2026.OC
San received three (3) bids, which are valid for 180 calendar days from the bid opening date.
The following is a list of the firms that submitted a bid:
Company Name Bid Determination
Nth Generation Computing, Inc.$3,565,600 Responsive / Responsible
Saitech Inc $3,570,995 Responsive / Responsible
ePlus Technology $3,624,279 Responsive / Responsible
Based on these results,staff recommends awarding the Purchase Order Contract to Nth Generation
Computing,Inc.The term of this Purchase Order Contract will begin upon the effective date of Notice
to Proceed.
Orange County Sanitation District Printed on 7/13/2026Page 2 of 3
powered by Legistar™
File #:2026-5017 Agenda Date:7/22/2026 Agenda Item No:12.
CEQA
N/A
FINANCIAL CONSIDERATIONS
This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been
budgeted (FY 2026-27 &2027-28 Budget,Section 6,Page 24,Repairs &Maintenance)and the
budget is sufficient for the recommended action.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
N/A
Orange County Sanitation District Printed on 7/13/2026Page 3 of 3
powered by Legistar™
ADMINISTRATION COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13.
FROM:Robert Thompson, General Manager
Originator: Jennifer Cabral, Director of Communications
SUBJECT:
PUBLIC AFFAIRS STRATEGIC PLAN FOR FISCAL YEARS 2024-2026 SUMMARY
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Receive and file the Public Affairs Strategic Plan for Fiscal Years 2024-2026 Summary.
BACKGROUND
The Orange County Sanitation District’s (OC San)Public Affairs Office is responsible for developing,
managing and disseminating all internal and external communications.The primary objective of the
Public Affairs team is to ensure messages are accurate,transparent,and foster trust and confidence
in OC San.An integrated Public Affairs Strategic Plan is essential to engage the diverse audiences
and align outreach efforts with OC San’s mission and values.
RELEVANT STANDARDS
·Build brand, trust, and support with policy makers and community leaders
·Maintain collaborative and cooperative relationships with regulators,stakeholders,and
neighboring communities
·Make it easy for people to understand OC San’s roles and value to the community
·Maintain influential legislative advocacy and a public outreach program
PROBLEM
OC San’s Public Affairs Office supports a wide range of initiatives that require effective
communication to both internal and external stakeholders.Inconsistent or uncoordinated messaging
can reduce impact and hinder public understanding of OC San’s mission and services.
PROPOSED SOLUTION
The Public Affairs Strategic Plan for Fiscal Years 2024-2026 included goals,objectives,strategies,
and tactics to execute the various messages and efforts set forth by OC San.The two-year plan was
effective through June 2026,with updates provided to the Administration Committee every six
months,including a year-end report.With the period complete,a summary report has beenOrange County Sanitation District Printed on 7/13/2026Page 1 of 5
powered by Legistar™
File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13.
months,including a year-end report.With the period complete,a summary report has been
prepared.
PRIOR COMMITTEE/BOARD ACTIONS
December 2025 -Received and filed the Public Affairs Strategic Plan for Fiscal Years 2024-2026 Mid
-Year Update.
July 2025 -Received and filed the Fiscal Year 2024-2025 Year-End Update to the Public Affairs
Strategic Plan (FY 2024-2026).
December 2024 -Received and filed the Public Affairs Strategic Plan for Fiscal Years 2024-2026 Mid
-Year Update.
June 2024 - Received and filed the Public Affairs Strategic Plan for Fiscal Years 2024-2026.
ADDITIONAL INFORMATION
Summary of Fiscal Years 2024-2026:
OC San’s Public Affairs Office Strategic Plan for Fiscal Years 2024-2026 (Plan)was developed based
upon the principles of OC San’s mission of protecting public health and the environment and to
support the implementation of OC San’s Strategic Plan.This Plan offered a vision to unify
communication efforts and focus resources to achieve the greatest impact and greatest results.The
Plan consisted of 11 categories. Below is a summary of the completed goals of the two-year plan.
·Employee Engagement Communications
Goal: Optimize communication with internal audience including those operating in the field.
o Conducted an Employee Engagement Survey in fall 2024 with a 55 percent response
rate
o Launched the Community Corner initiative in response to feedback from the
engagement survey and held three events across Plant Nos. 1 & 2 and Headquarters
o Redesigned the Volunteer Incentive Program to increase employee participation
§1,160 volunteer hours
o Launched a newly designed intranet (The San Box)
§Posted 1,241 stories and updates
o Distributed 104 Three Things to Know Emails (weekly email)
o Published 12 issues of the employee newsletter,The Pipeline
o Hosted 10 employee events
o Developed a new employee welcome kit and distributed 82 kits
o Held an employee t-shirt design contest;the winning design is available at the OC San
company store
o Held first ever Employee Art Contest with six submissions
o Hosted the Honor Wall event for five honorees and over 100 guests
o Hosted the Take Your Kid to Work Day event for the first time since 2017 with over 200
kids and over 100 employees participating
o Held the first Employee Family Picnic in over 20 years,with more than 300 staff and
Orange County Sanitation District Printed on 7/13/2026Page 2 of 5
powered by Legistar™
File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13.
o Held the first Employee Family Picnic in over 20 years,with more than 300 staff and
family members in attendance
·Industry Experts
Goal:Establish and solidify OC San’s reputation as infrastructure leaders in the wastewater
and resource recovery industry.
o 54 agency awards received with 23 of them specific to Public Affairs
o 54 speaking engagements, reaching over 1,400 people
o Launched the Resource Innovation for a Sustainable Environment (RISE)program
highlighting our sustainability initiatives
·Media Relations
Goal: Cultivate relationships with traditional and social media journalists and influencers.
o 14 press releases issued
o 1,421 social media posts across five platforms with an average reach of 6,300
o 2,865 new followers across four platforms
o 48 articles published (including an OC San mention)
·Agency Branding and Messaging
Goal:Enhance OC San’s image and branding by utilizing proper messaging in external
communication pieces such as OC San’s website,presentations,digital media,and
advertising, which includes maintaining a positive experience for OC San visitors.
o Published eight (8)issues of the OC San Connection Newsletter,reaching an average
of 3,500 subscribers per issue
o Published 107 articles on the OC San website
o Completed 387 graphic design projects
o Installed an educational pipe display for OC San Headquarters
o Updated OC San’s Video library - nine (9) new videos completed
o Added 106 new honorees to the Honor Roll Permittee awards program
o Developed and launched a new website
·Educational Outreach
Goal:Identify and implement avenues for education and outreach within OC San’s service
area to promote OC San’s mission and vision.
o Hosted 229 tours reaching over 4,650 people
o Partnered with the Heritage Museum of Orange County through June 2025 to include
OC San messaging reaching approximately 2,500 people
o Participated in 24 community events reaching over 4,200 people
o Continued Inside the Outdoors program,resulting in engagement with over 2,400
students
o Held three sessions of the Wastewater 101 Citizens’Academy that concluded with 178
graduates
o Created and launched a Library Program to highlight OC San messaging and careers in
wastewater
o Hosted a film screening of a documentary highlighting America’s essential water
Orange County Sanitation District Printed on 7/13/2026Page 3 of 5
powered by Legistar™
File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13.
professionals, attended by over 100 guests
·Capital and Maintenance Outreach
Goal:Develop and implement outreach programs that will engage the communities affected by
OC San construction and maintenance activities.
o Provided outreach support for more than a dozen Capital Improvement Program
projects
o 34 printed notifications distributed reaching over 71.4k people
o 73 electronic messages issued, reaching over 2,400 residents
o Four (4) presentations given to City Councils
o Held four (4) community meetings
o Conducted Construction Outreach team training for engineering staff
o Visited neighborhoods to share project information with residents
·Legislative Affairs
Goal:Proactive engagement in legislative advocacy efforts that could impact OC San and the
wastewater industry.
o Developed annual Legislative and Regulatory Plan
o Issued 16 State position letters
o Issued two (2) Federal position letters
o Actively tracked 60 bills
o Participated in Advocacy Day in Sacramento and met with six representatives from
different Senate and Committee offices
·Grants Coordination
Goal: Monitor, track, and apply for grants available to OC San.
o Continued supporting the $3.45 million in community project funding
o Researched grant opportunities applicable to OC San
·Local Government Affairs
Goal:Ensure that local elected officials,member agencies,stakeholders,and OC San Board
Members are actively engaged in the work of OC San.
o Board Member Speaking Points issued monthly
o Coordinated Board Member Orientation
o Developed OC San’s Annual Report
o Hosted two in-person State of OC San events reaching over 150 participants for each
event
o Hosted representatives from 43 public agencies and council/board offices for facility
tours
o Published 24 “Five Minutes Per Month” emails
o Produced eight (8) member-agency outreach toolkits
·Crisis Management
Goal:Ensure the Public Affairs Office serves as the primary spokesperson for OC San during
normal business and crisis scenarios and facilitates the dissemination of information.
o Continued monitoring and updating the Public Affairs Office’s Continuity of Operations
Orange County Sanitation District Printed on 7/13/2026Page 4 of 5
powered by Legistar™
File #:2026-5018 Agenda Date:7/22/2026 Agenda Item No:13.
o Continued monitoring and updating the Public Affairs Office’s Continuity of Operations
Plan
o Supported OC San during emergency situations
o Participated in tabletop exercises
·General Manager Support
Goal:Ensure the General Manager and Assistant General Managers are supported with
information necessary to communicate to the varied OC San audiences.
o Produced 24 General Manager Reports
o Prepared 24 Board Member talking points
o Planned and hosted two (2) All-Hands meetings
o Developed material for speaking engagements and presentations
o Coordinated Strategic Planning update workshops
o Facilitated General Manager’s Work Plan coordination including mid-year updates and
year-end reports
FINANCIAL CONSIDERATIONS
All items included in the Public Affairs Strategic Plan for Fiscal Years 2024-2026 were budgeted in
the FY 2024-2026 Budget.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete
agenda package:
·Public Affairs Strategic Plan, FY 2024-2026
·Public Affairs Portfolio, FY 2024-2026
·Presentation
Orange County Sanitation District Printed on 7/13/2026Page 5 of 5
powered by Legistar™
PAO Strategic Plan FY 2024-26
June 2024
1
Public Affairs Strategic Plan
FY 2024-2026
Introduction
The Orange County Sanitation District’s (OC San) Public Affairs Office (PAO) is responsible for managing
all internal and external communications. The PAO's main goal is to ensure messages are accurate,
transparent, and build public trust and confidence. An integrated Public Affairs Strategic Plan is
essential for effectively addressing the diverse audiences we serve.
The PAO offers services, tools, and programs to meet OC San’s communication needs. This
includes media relations, website and intranet site content, construction outreach, elected
officials and government relations, internal communications, education, outreach, and graphic
development.
The PAO has developed a Strategic Plan (Plan) for Fiscal Years 2024 - 2026. This Plan is
developed based upon the principles of OC San’s Mission of protecting public health and the
environment and will support the implementation of OC San’s Strategic Plan. This Plan offers a
vision to unify our communication efforts and focus resources to achieve the greatest impact
and greatest results.
Because much of what is planned and created by this group is based on external factors and
therefore outside of our control, flexibility and fluidity is integrated into the Plan. The PAO will
follow the guidance set forth by management and the Board of Directors to carry out OC San’s
messaging and support our member agencies.
Background Information
OC San represents 20 cities, 4 special districts, and a portion of the unincorporated County of
Orange. This area represents a community of 2.6 million people with approximately 550,000
customer accounts.
Unlike most public agencies where there is direct contact with customers, OC San’s billing
occurs through the County of Orange property tax bills. Therefore, OC San must work through
other means to communicate with the public and the rate payers.
We have a 25-member Board of Directors, and more than 650 employees within six
departments with various goals and objectives. While these groups work independently on a
variety of projects, the goal of the PAO is to provide support and messaging that is consistent
throughout the agency so that we are one voice, representing the same overall goals, and
portraying the same brand.
PAO Strategic Plan FY 2024-26
June 2024
2
There are many challenges with serving such a large and diverse customer base, however; there
are also great opportunities working through the strategies laid out in this Plan.
Public Affairs Team
The division is staffed with seven full-time employees and overseen by a supervisor and a
department head.
Jennifer Cabral, Director of Communications
Daisy Covarrubias, Public Affairs Supervisor
Rebecca Long, Senior Public Affairs Specialist
Belen Carrillo, Senior Public Affairs Specialist
Kelly Newell, Public Affairs Specialist
Public Affairs Specialist – Vacant
Gregg Deterding, Graphics Designer
Isai Carrillo, Graphics Designer
Cheryl Scott, Administrative Assistant
Each of these team members carry out specific functions to meet the communication goals and
objectives laid out in this Plan.
Situation Analysis
• OC San approved a five-year rate program in 2023. Public communication must account
for the financial impact on OC San ratepayers as decisions and proposed fees for the
next five years are developed and communicated.
• OC San must continue to attract talented and qualified personnel to fill vacancies.
Effectively communicating OC San’s culture and emphasizing the importance of
professional relationships is essential to the effectiveness and functionality of the
agency.
• OC San will have new Board leadership and is anticipating a high turnover post the
November 2024 election. Continuous engagement with the Board of Directors will be
critical for the success of this agency.
PAO Strategic Plan FY 2024-26
June 2024
3
• As an essential service, OC San has continued to execute the Capital Improvement
Program (CIP) to keep the regional projects on schedule, improving and maintaining the
regional sewer system throughout the service area. In the next two fiscal years, OC San
plans to award 38 construction contracts worth a total of $340 million.
• OC San administrative staff have moved into a new Headquarters across the street from
Plant No. 1, in Fountain Valley. The new building houses over 300 staff members that
were previously spread across 10 buildings. Internal communications and engagement
will need to become a greater focal point to ensure OC San’s culture remains positive
between staff located at the Plants, and staff at Headquarters.
Mission
The Public Affairs Office is committed to communicating information about OC San in a timely,
accurate and accessible way to the employees, the Board of Directors, our member agencies,
elected officials, the public, and the news media.
• We are committed to open, honest, clear, and respectful two-way communication with
our audiences.
• We are dedicated to informing others about how OC San serves the public and protects
the environment.
• We are committed to outstanding customer service by responding to requests quickly
and efficiently.
• We are dedicated to teamwork and collaboration as well as being creative and taking
the initiative to be out in front of issues.
Audiences
This Public Affairs Plan focuses largely on four primary audiences.
• Internal
o Board of Directors
o Executive Management Team
o Employees
o Retirees
• The Public
o Ratepayers
o Member Agencies
o Residents, Businesses, Commuters Impacted by OC San Construction and
Maintenance
PAO Strategic Plan FY 2024-26
June 2024
4
o OC San Neighbors near our facilities (plants and pump stations)
o Schools and Students
o Tour Groups
• Industry
o Water/Wastewater Agencies
o Trade Organizations
o Trade Media
o Contractors and Consultants
• Influential Public
o Local, State, and Federal Elected Officials
o Environmental Groups
o Local Media
Agency Key Messages
• OC San is committed to protecting public health and the environment by providing
effective wastewater collection, treatment, and recycling.
• OC San is more than a wastewater treatment facility; we are a resource recovery facility
making use of all our byproducts.
• OC San is dedicated to exceeding wastewater quality standards used for resource
recovery.
• OC San is committed to proper planning to ensure that public funds are wisely spent.
• OC San’s assets are monitored and evaluated regularly to ensure top performance and
timely replacement.
• OC San values communicating our mission and strategies with those we serve and all
other stakeholders.
• OC San provides an essential service to 2.6 million people at one of the lowest rates in
the state.
• Providing reliable, responsive, and affordable services in line with our customer needs
and expectations is a top priority for OC San.
• OC San is committed to creating the best possible workforce, prioritizing safety,
productivity, customer service, and training.
PAO Strategic Plan FY 2024-26
June 2024
5
• OC San has diligently developed an integrated planning environment that starts with the
Board of Directors’ expectations and extends to each employee’s work product. We
strive to ensure our staff members communicate effectively and provide transparent
services to support the Plan.
• OC San has developed an integrated Planning/Asset Management system that allows for
intentional, thoughtful decision making to maintain current operations while adding
resilience and meeting new challenges.
• OC San’s organizational structure includes informal relationships between employees
that facilitate collaboration toward common goals.
Public Affairs’ Goals for Fiscal Year 2024/25 and 2025/26
1. Optimize communication with our internal audience.
2. Continue to build OC San’s reputation as leaders in the wastewater and resource
recovery industry.
3. Cultivate relationships with traditional and social media journalists and influencers to
promote OC San’s programs and initiatives.
4. Enhance OC San’s image and branding by utilizing proper messaging in external
communication pieces such as OC San’s website, presentations, digital media, and
advertising. Maintain a positive experience and image for our visitors.
5. Identify and implement avenues for education and outreach within OC San’s service
area to further promote OC San as a resource recovery agency, our mission, and career
opportunities within the wastewater industry.
6. Educate and inform the public on the various OC San initiatives aimed to protect the
environment such as What 2 Flush; Fats, Oil, and Grease; and any other necessary
message.
7. Develop and implement outreach programs that will engage the communities affected
by OC San’s construction projects.
8. Ensure proactive engagement in legislative advocacy efforts that could impact OC San
and the wastewater industry.
9. Monitor, track, and apply for grants available and that make business sense to OC San.
10. Ensure that elected officials, member agencies, stakeholders, and OC San Board
Members are actively engaged in the work of OC San.
11. Ensure the Public Affairs Office serves as the primary spokesperson for OC San during
normal business and crisis scenarios and facilitates the dissemination of information.
PAO Strategic Plan FY 2024-26
June 2024
6
To achieve these goals, PAO outlines the following strategies and tactics, along with the primary
staff assigned to each area. Although individual staff members are the key contacts for each of
the goals, the team works collectively and collaboratively, reflecting our core values. Our staff
acknowledges the key role we play at OC San, not only communicating information, but also
educating, consulting, and serving as a resource to our Board of Directors, employees, the
wastewater industry, our member agencies, and our community. Flexibility is implemented into
this plan to deal with unexpected situations and circumstances.
Public Affairs Strategies and Tactics
1. Category: Employee Engagement
Program Lead: Rebecca Long
Program Coordinator/Support: Kelly Newell, Gregg Deterding, Isai Carrillo, and Cheryl Scott
Goal (what): Optimize communication and engagement with our internal audience to include
both field staff and administrative staff.
Objective (measure): Establish a base line of current engagement by tracking access and participation
from the identified tactics.
Strategy (why): We value open and honest communication with our employees. PAO is
committed to various efforts aimed at keeping OC San employees informed about important
topics, increasing the overall quality of communications to our employees while tying the
business aspects of the agency with the human-interest side.
Tactics (how):
• Keep information on The San Box current, relevant, and useful for OC San employees by
working with the various departments to gather information that should be shared.
• On a regular basis, staff will continue to support various departments with their
communication and outreach needs.
• PAO will produce six Pipeline newsletters per year with a goal of circulation by the third
week of the publication month.
• Incentivize employees to educate and inform the public of OC San’s essential service
through the Volunteer Incentive Program (VIP) by issuing points for all volunteer hours.
• Create employee recognition and celebratory events throughout the year, this may
include small in-person gatherings and virtual events. To include but not limited to the
Annual Holiday Lunch, the Harvest Festival, and VIP Celebration, etc.
• Continue with the Honor Walk program which acknowledges retired staff and past
Board Members for their contribution to OC San. The recognition event will be hosted
every other year starting in 2025.
PAO Strategic Plan FY 2024-26
June 2024
7
• Write and coordinate the 3 Things to Know email blast to be distributed to all staff each
Monday.
• Support and promote OC San “U”, OC San’s training program.
• Create “New Employee Welcome Kit” to be distributed on employees first day of work
to introduce employees to the OC San culture, include electronic communication with
key messages and link to important information.
• Create and implement an employee engagement audit to assess the value of the
information shared, the method used, and feedback on OC San’s culture.
o Conduct periodic surveys following employee events to allow for improvements
and/or modifications.
• Implement an employee art contest using OC San’s infrastructure.
2. Category: Industry Experts
Program Lead: Kelly Newell
Program Coordinator/Support: Public Affairs Specialist, Gregg Deterding, Isai Carrillo, and
Cheryl Scott
Goal (what): Establish and solidify OC San’s reputation as infrastructure leaders in the
wastewater and resource recovery industry.
Objective (measurable): Increase participation in strategic organizations through conferences,
networking activities and awards by five percent.
Strategy (why): To build positive public perception and confidence among our various
audiences.
Tactics (how):
• Encourage participation and presentation in conferences.
• Encourage and support award application submittals.
• Publicize and coordinate award acceptance logistics.
• Track all awards won by OC San by keeping a master list.
• Track and promote staff abstracts, and publications.
3. Category: Media Relations
Program Lead: Rebecca Long
Program Coordinators: Kelly Newell, Belen Carrillo, Gregg Deterding, and Cheryl Scott
Goal (what): Cultivate relationships with traditional and social media journalists and
influencers.
PAO Strategic Plan FY 2024-26
June 2024
8
Objective (measurement): Track and increase media coverage with positive stories about OC
San.
Strategy (why): While a presence in the community is important to putting a face to our agency,
media (traditional and social) is equally important with a broader reach and a more direct line
of communication.
Tactics (how):
• Annually update media list to stay current and fresh.
• Maintain a digital press kit.
• Build a calendar of news release topics of interest to the public and stakeholders.
• Invite media for a facility tour, including traditional and non-traditional media.
• Develop media strategies for important events, decisions, or actions.
e.g. CIP Campaign (see details in Category 6: Capital and Maintenance Outreach
• Weekly (3-5 times) social media posts about the happenings at OC San with focus on OC
San’s accomplishments and mission.
• Continue with social media campaigns # #OCSanCareers, #What2Flush, and those
currently supporting ongoing efforts.
4. Category: Agency Branding and Messaging
Program Lead: Belen Carrillo
Program Coordinators/Support: Gregg Deterding, Isai Carrillo, Kelly Newell, Public Affair
Specialist, and Cheryl Scott
Goal (what): Enhance OC San’s image and branding by utilizing proper messaging in external
communication pieces such as OC San’s website, presentations, digital media, advertising,
which includes maintaining a positive experience for OC San visitors.
Objective (measure): Continue with OC San’s branding campaign including updating collateral
material, signage, and promotional material as appropriate and as it is used. Maintain the
lobby(s) current and informative with relevant information, i.e., displays, awards case, etc.
Strategy (why): A cohesive voice, message, look, and feel are critical to the public perception
that an organization holds with its community. A positive and pleasant in-person experience
reinforces OC San’s culture and core values as well as showcasing OC San as industry leaders,
and a well-run organization, leaving behind the stigma of typical government agencies.
Tactics (how):
• Develop new website to better meet the information needs of our visitors while
meeting accessibility standards.
PAO Strategic Plan FY 2024-26
June 2024
9
• Maintain website accuracy, relevancy and timeliness with new stories posted weekly.
• Provide presentations, consultation, and advice on the branding and image of OC San.
• Develop new collateral materials around the key messages.
• Explore advertising options to inform the public of agency efforts and role in enhancing
the local economy.
• Fulfill all requests for graphics, photos, and logos.
• Continue with online community newsletter. Increase reach and distribution list.
• Update and maintain signage across OC San facilities.
• Develop a Board approved design for the hands-on educational display for the outdoor patio.
• Maintain the lobby wall in the Operations Center at Plant No. 2 with OC San’s current
branding and messaging and implement lobby display at the Headquarters.
• Rotate flags on light poles at Plant No. 1 and at Plant No. 2 on a biennial basis.
• Keep the award display up to date by rotating awards.
• Install a retiree display in the Headquarters and keep it up to date.
• Maintain and coordinate the installation of Honor Walk bricks on a biennial basis.
• Display collateral material in a neatly and organized manner displayed with current and
relevant information.
• Update a video library of OC San programs to utilize as educational and promotional
tools.
• Promote implementation of OC San’s permittee awards program that recognizes
industries for improving their adherence to excellent standards and expand to recognize
multi-year awardees. Identify methods to include waste haulers in recognition system.
5. Category: Educational Outreach
Program Lead: Belen Carrillo
Program Coordinators/Support: Kelly Newell, Public Information Specialist, Gregg Deterding,
Isai Carrillo, and Cheryl Scott
Goal (what): Identify and implement avenues for education and outreach within OC San’s
service area to promote OC San’s mission and vision.
Objective (measurement): Create and identify new educational opportunities including virtual
events and webinars to promote and educate the community on OC San’s work and the
essential service provided.
Strategies (why): To further promote OC San as a resource recovery agency, promote OC San’s
mission and promote career opportunities within the wastewater industry.
Tactics (how):
PAO Strategic Plan FY 2024-26
June 2024
10
• Execute the Inside the Outdoors contract for Fiscal Year 2025-2026 to continue the
educational partnership that includes the Sewer Science program to 500 students within
Orange County and introduce them to OC San’s virtual tour program.
• Revise plant tours to incorporate Headquarters.
• Identify 8-10 community event opportunities for OC San to participate in to inform and
educate the community on the important role OC San plays in public health and the
environment.
• Expand OC San’s speaker’s bureau to provide a wider set of speakers available.
• Continue hosting Wastewater 101 Citizen Academy for our ratepayers, and influential
public to showcase OC San operations and initiatives. Host one session with four classes
per year.
• Support the Heritage Museum of Orange County’s educational efforts by supplying
material to be used for virtual and in-person teaching of OC San’s key messages.
• Connect with OC San service area libraries to identify possible OC San program
collaboration and implementation opportunities that would aim to. highlight selected
OC San messaging points such as What 2 Flush, the wastewater treatment process, and
career opportunities.
6. Category: Capital and Maintenance Outreach
Program Leads: Belen Carrillo and Tanya Chong from Engineering,
Program Coordinators/Support: Kelly Newell, Public Affairs Specialist, Rebecca Long, Gregg
Deterding, Isai Carrillo, Cheryl Scott,
Goal (what): Develop and implement outreach programs that will engage the communities
affected by OC San construction and maintenance activities.
Objective (measurement): Develop, implement, and provide outreach support for over 10
capital projects scheduled to break ground in fiscal years 2024/2025 and 2025/2026 in more
than 10 cities.
Strategy (why): Form a positive presence in the community prior to the start of construction
projects or maintenance activities that is personal and proactive. Provide impacted community
with information ahead of construction activities. Inform them of the benefits and need for the
project to gain support and understanding of the necessary construction.
Tactics (how):
• Proactively offer briefings and community meetings to impacted neighborhoods, civic
groups, businesses, schools, churches, and other institutions within the project area on
an as needed basis.
PAO Strategic Plan FY 2024-26
June 2024
11
• Explore the option of placing advertising pieces in communities/areas impacted by
construction.
• Respond to inquiries within a 24-hour period.
• Provide project description and notifications to impacted residents at least two weeks
before construction begins.
• Update collateral materials, fact sheets and website with current construction
information on an as needed basis.
• Maintain ongoing communications with city staff and Board Members on current and
upcoming construction outreach projects in affected cities.
• Maintain ongoing communications with impacted residents within the project area
through collateral material (e.g., flyers, door hangers, emails, text alerts, social media
posts, etc.).
• Measure customer satisfaction through a construction outreach survey to be distributed
at the close of construction programs.
• Provide outreach program training for the engineering team to help them understand the
outreach program, the role of the community liaison and benefits to project.
• Implement a multipronged outreach strategy that will include industry and media coverage for
the Supercritical Water Oxidation project.
7. Category: Legislative Affairs
Program Lead: Rebecca Long
Program Coordinator/Support: Kelly Newell, Public Affairs Specialist, and Cheryl Scott
Goal (what): Proactive engagement in legislative advocacy efforts that could impact OC San and
the wastewater industry.
Objective (measure): Continue positive relationships with local, state, and federal officials
through facility tours, meetings, and bill tracking as stated in the Legislative Plan.
Strategy (why): Legislative advocacy is an important aspect of our business. Having
relationships and being actively involved, providing input and OC San’s perspective on potential
legislature can and does directly affect OC San and our business.
The PAO is responsible for executing the Board approved Legislative Plan, which is updated on
an annual basis. In addition, staff is responsible for tracking state and federal legislation,
managing OC San’s legislative advocates, and seeking appropriations and grants.
Tactics (how):
• Develop and implement Annual Legislative Plan in the second quarter of each fiscal
year.
PAO Strategic Plan FY 2024-26
June 2024
12
• Track bills and maintain a priority list of key legislation.
• Provide regular updates to the Legislative and Public Affairs Committee on state and
federal matters.
• Host legislative tours.
• Engage in Advocacy Days in Sacramento and Washington DC as needed.
• Take positions on bills that could affect OC San or the industry.
• Work with industry organizations on state and federal issues to ensure OC San’s
positions are communicated.
• Partner with industry organizations to co-host virtual events and activities.
• Manage the legislative advocates’ contracts and facilitate regular communication
between lobbyists, staff, and the Board of Directors.
8. Category: Grants Coordination
Program Lead: Rebecca Long
Program Coordinator/Support: Kelly Newell, Public Affairs Specialist, and Cheryl Scott
Goal (what): Monitor, track, and apply for grants available to OC San.
Objective (measure): Apply and obtain grants for qualified OC San projects and programs.
Strategy (why): Outside funding is important in moving OC San projects and programs forward.
With ongoing attention to government spending, it is vital for OC San to apply for and secure
grants to offset costs when available.
Tactics (how):
• Apply for two grants a year based on availability.
• Ensure Grant Policy is updated and current.
• Research grant opportunities and report out to the Legislative and Public Affairs
Committee.
• Seek out available grant funding opportunities for OC San and its various divisions.
• Secure letters of support.
• Publicize grant awards received.
• Create and measure outcomes.
9. Category: Local Government Affairs
Program Lead: Rebecca Long and Belen Carrillo
Program Coordinators/Support: All PAO staff
Goal (what): Ensure that local elected officials, member agencies, stakeholders, and OC San
Board Members are actively engaged in the work of OC San.
PAO Strategic Plan FY 2024-26
June 2024
13
Objective (measure): Provide at least two communication tools per month.
Strategy (why): Keeping OC San’s influential public engaged in OC San’s projects and
accomplishments are critical to the support and success of our agency.
Tactics (how):
• Provide Board of Directors with speaking points following every OC San board meeting
that can be used when reporting back to their respective councils and community
groups.
• Support an orientation (as needed) for new Board members.
• Develop and keep a current list of monthly informational presentations.
• Maintain an informational presentation video library for the Board of Directors on key
agency topics.
• Provide regular reports to the Steering Committee.
• Develop OC San’s Annual Report.
• Publish a Five Minutes Per Month, each month.
• Participate in government affairs committees.
• Invite new council and board members within OC San’s service area to take a tour of OC
San and offer presentations to their respective agencies on OC San programs and
efforts.
• Create and distribute quarterly outreach tool kits for member agency PIOs to help them
easily share and disseminate information about OC San.
• Host a “State of OC San” event for influential leaders throughout the infrastructure and
water/wastewater industry, including virtual option.
10. Category: Crisis Management
Program Lead: Rebecca Long
Program Coordinators/Support: All PAO Staff
Goal: Ensure the PAO serves as the primary spokesperson for OC San during normal business
and crisis scenarios and facilitates the dissemination of information.
Objective: Ensure that the PIOs in the PAO can respond in a crisis. Provide the necessarily tools
and material to follow established protocols and support the situation as needed.
Strategy: It is imperative during a crisis that OC San be proactive and provide clear and effective
messaging to employees, public, and the media.
PAO Strategic Plan FY 2024-26
June 2024
14
Tactics (how):
• Maintain an updated crisis communication plan including regular briefings with staff to
identify possible issues and responses.
• Maintain and update PAO’s Continuity of Operations Plan (COOP).
• Work with Risk and Safety Management on Public Affair’s role in an emergency,
including our role via the Integrated Emergency Response Plan.
• Ensure proper procedures are in place for Board, employees, and public notification.
• Maintain updated contact lists for resource, member, and partnering agencies to
coordinate and assist during crisis.
• Develop protocols on everyday PAO tasks to facilitate the operations of the group in a
time of crisis.
11. Category: General Manager Support
Program Lead: Daisy Covarrubias / Rebecca Long
Program Coordinators/Support: All PAO Staff
Goal: Ensure the General Manager and Assistant General Managers are supported with
information necessary to communicate to the varied OC San audiences.
Objective: Develop monthly communication pieces on behalf of the General Manager. Ensure
General Manager (or designee) is participating and involved in promoting OC San’s initiatives.
Strategy: Collaborate with the General Manager to prepare communication and messaging that
reflects the mission and vision of OC San.
Tactics (how):
• Assist the General Manager and the Assistant General Managers with keeping the Board
Members informed and up to date with OC San activities.
• Assist in the development of the General Manager’s Monthly Report.
• Develop talking points for Board and Committee meetings.
• Develop material and speaking points for presentations and speaking engagements.
• Support the development of the OC San Strategic Plan.
• Assist in the development of the General Manager’s Annual Work Plan, including mid-
year and end of year reports.
• Manage Ask the GM questions submitted.
• Coordinate and support VIP tours guided by General Manager and Assistant General
Manager.
• Coordinate and produce annual All Hands meetings (live and/or pre-recorded) to keep
employees informed and engaged.
PAO Strategic Plan FY 2024-26
June 2024
15
Closing Comments
This plan is a broad outline of the Public Affairs Office program. As new issues arise, new
functions and duties will evolve as well. The role of the Public Affairs Office is to stay ahead of
issues, be responsive and flexible to meet the needs of the agency. We will adjust our program
accordingly.
New Tactics Introduced
• OC San new website – In progress
• Library Educational Program
• Headquarters Educational Display – Phase 2
• Library Educational Program
• Video Library Update
• Employee Engagement Audit
• New Employee Welcome Kit
• Employee Art Contest
A Selection of Projects Completed in
Fiscal Years 2024-25 and 2025-26
Public AffairsPortfolio
Page left intentionally blank
3
MEET THE TEAM
Jennifer CabralCommunications Manager
Kelly NewellPublic Affairs Specialist
Daisy CovarrubiasPublic Affairs Supervisor Rebecca LongPrincipal Public Affairs Specialist
Gregg DeterdingGraphics Designer
Belen Carrillo
Senior Public Affairs Specialist
Cheryl ScottAdministrative AssistantIsai CarrilloGraphics Designer
Becky PolcynPublic Affairs Specialist
4
Branding 5
Internal Projects 12
External Projects 22
TABLE OF CONTENTS
5
BRANDING
6
BRANDINGLogo Design
OC San Program - RISE
OC San’s Intranet - The San Box
OC San Employee Engagement Program - Community Corner
7
Light Pole Banners
BRANDINGEnvironmental Design
8
BRANDINGEnvironmental Design
Headquarters IT Service Desk Wall
9
Headquarters Artifact Wall
BRANDINGEnvironmental Design
10
Water Dispenser wall art
BRANDINGEnvironmental Design
11
Headquarters Lobby Digital Display
FOGFATS, OILS, AND GREASE
Never pour FOG down the drain.
Learn more at ocsan.gov
Stay Connected. Follow Us@OCSanDistrict
“FLUSHABLE” WIPES ARE NOT FLUSHABLE
WIPES AND PHARMACEUTICALS BELONG IN THE TRASHLearn more at ocsan.gov
Learn more at ocsan.gov
BRANDINGEnvironmental Design
12
EXTERNAL
PROJECTS
13
EXTERNAL PROJECTSOC San Connection - Community Newsletter
OC San Connection
Summer 2025
published by the orange county sanitation district
community newsletter
Shining Bright Like FireworksHow OC San Generates Its Own Energy
P. 4
OC San Connection
Fall 2025
published by the orange county sanitation district
community newsletter
Big Pipes, Big History
OC San Unveils Full-Scale Pipe Display
P. 6
14
happening in the CITY OF NEWPORT BEACH
Sign up for project alerts: www.ocsan.gov/baybridge
Replacing the old with the
new – OC San is coming
soon to Coast Highway
STARTING THIS SUMMER!2025-2029
a construction project by OC SAN
Pump Station and Force Mains Replacement Project
BAY BRIDGE
Replacing the old with the new — OC San is coming soon to Coast Highway
EXTERNAL PROJECTSConstruction Outreach
Construction Project “Movie” Poster
15
3 Cities.3 Cities.
7 Miles of Regional Pipeline.
100 Manholes.
CITY OF
CYPRESS
CITY OF
LA PALMA
CITY OF
LOS ALAMITOS
Cypress Trunk Sewer Project
Visit ocsan.gov/cypress to learn more.
Starting Summer 2025 and lasting
approximately 3 years.
1 Project.
EXTERNAL PROJECTSConstruction Outreach
Construction Project “Movie” Poster
16
EXTERNAL PROJECTSConstruction Outreach
Construction Project “Movie” Poster
17
Web Newsletter Header
CONSTRUCTION IN CYPRESS!
Postcard
EXTERNAL PROJECTSConstruction Outreach
18
EXTERNAL PROJECTSSocial Media
19
Brian
Bingman
Mike
McCarthy
Yu-Li
Tsai
Jim
Herberg
Greg
Sebourn
H O N O R I N G
SCAN TO RSVP or emailForinformation@ocsan.gov by Wednesday, June 18.
e Honor Wall recognizes past board members and sta for their signicant contributions to the quality of operations and leadership.
Honorees will be memorialized on a wall outside
of OC San Headquarters in Fountain Valley.
18480 Bandilier Cir, Fountain Valley, CA 92708 | 714.962.2411 | www.ocsan.gov
O R A N G E C O U N T Y S A N I T A T I O N D I S T R I C T
Dr. Yu-Li Tsai dedicated nearly 30 years of his career to OC San, becoming a renowned technical expert, visionary leader, and mentor whose impact continues to shape the organization today. His work in the lab, particularly his pioneering efforts in molecular methods like Polymerase Chain Reaction for detecting
wastewater viruses, earned him over 75 peer-reviewed publications and solidified his position as a leader in the wastewater industry.
Dr. Tsai’s most significant achievement was his instrumental role in securing the National Environmental Laboratory Accreditation Program (NELAP)
accreditation for OC San’s laboratory, making it the first municipal lab in California to achieve this distinction in 2017. His leadership and persistence led to OC San’s early adoption of the TNI Standard, elevating the lab’s quality assurance practices and ensuring the reliability and defensibility of its data.
As a mentor, Dr. Tsai inspired and supported many within OC San, guiding colleagues through technical challenges, career advancements, and professional growth. His service extended beyond OC San, influencing the next generation of environmental scientists at UC Irvine and his lasting contributions to OC San.
His dedication to scientific excellence, and commitment to the community make him so worthy to receive this honor.
H O N O R I N G
Yu-Li Tsai, Ph.D.
76
EXTERNAL PROJECTSEvent Branding
Headquarters Lobby Digital Display
Brochure
Wall Graphic
Invitation
20
Invitation
ORANGE COUNTY SANITATION DISTRICTState of OC San
Join our Board of Directors and General Manager as we discuss our accomplishments and exciting advances.
An optional tour of our Fountain Valley Plant No. 1 will take place immediately following the event.
Mile Square Golf Course Clubhouse10401 Warner AvenueFountain Valley, CA 92708
For more information or questions, email: forinformation@ocsan.gov
Friday, October 2511 a.m. – 1 p.m.
YOU’RE INVITED!
ORANGE COUNTY SANITATION DISTRICT
Lunch and Networking
Welcome and State of OC San Presentation Board Chairman, Ryan Gallagher
Facility tour immediately following program. A bus will be available to take you to our OC San Reclamation Plant No. 1.
10844 Ellis Avenue, Fountain Valley, CA 92708
State of OC San
Friday, October 2511 a.m. – 1 p.m.
P R O G R A M
SCAN HERE to view the Fiscal Year 23/24 OC San Annual Report
Program
ORANGE COUNTY SANITATION DISTRICT
State of OC San
Welcome to
Signage
State of OC San
ADRIANAGODINEZ
Santa Ana Regional Water Quality Control Board
Name Tag
Protecting Public Health
and the Environment
Giveaway - Coaster
EXTERNAL PROJECTSEvent Branding
21
EXTERNAL PROJECTSEvent Branding
Presented by the OC San Board of Directors.
Joaquin Esquivel, Chair of the State Water Resources Control Board, will serve as the distinguished guest speaker.
Optional Plant tour following program.
ORANGE COUNTY SANITATION DISTRICTStateof OC San
Friday, October 17, 2025
11 a.m. - 1 p.m.
LOCATION: OC San Headquarters 18480 Bandilier Circle, Fountain Valley, CA
FOR MORE INFORMATION OR QUESTIONS, EMAIL US AT FORINFORMATION@OCSAN.GOV.
Event is free, registration is required.
Lunch and Networking
Call Meeting to Order Board Chair, Ryan Gallagher
Welcome and State of OC San Board Chair, Ryan Gallagher
Guest Speaker Joaquin Esquivel, State Water Resources Control Board
Adjourn Meeting Board Chair, Ryan Gallagher
Plant tour immediately following the event
Friday, October 17, 202511 a.m. - 1 p.m.
P R O G R A M
Luncheon
State of OC San
SCAN HERE To view the Fiscal Year 2024/25 OC San Annual Report
Invitation Program
Luncheon
State of OC San
Welcome
Luncheon
State of OC San
SCAN HERE to view the Fiscal Year 24/25 OC San Annual Report
Signage
22
Pipe Display
EXTERNAL PROJECTSEnvironmental Design
23
Pipe Display Placards
EXTERNAL PROJECTSEnvironmental Design
24
INTERNAL
PROJECTS
25
INTERNAL PROJECTSPipeline - Employee Newsletter
YOUR SOURCE FOR OC SAN NEWS AND INFORMATION
September/ September/ October2024
Travel Through Time ...........................P2Under Construction .............................P5Department Profile ..............................P6Shining Stars ..........................................P12Community Connections ................P14State of OC San .....................................P15Health Fair ...............................................P15
The Best Of OC San ............................P16Celebrating Years Of Service ........P18And The Award Goes To .................P20Cold Weather Care ............................P22Welcome To The Team....................P23On The Move .........................................P24Service Awards ....................................P24
Inside this Issue:
YOUR SOURCE FOR OC SAN NEWS AND INFORMATION
January/February2025
YOUR SOURCE FOR OC SAN NEWS AND INFORMATION
July/August2024
Inside this Issue:
Summer Memories ...............................P2Under Construction .............................P4Department Profile ..............................P6New EMT Member ..............................P10Two Year Budget .................................P12GM’s Year End Report .......................P13
Goodbye Nerissa .................................P14The Best Of OC San ............................P16Celebrating Years Of Service ........P18And The Award Goes To .................P20Welcome To The Team....................P23On The Move .........................................P24
SummerSummerEndless
26
INTERNAL PROJECTSPipeline - Employee Newsletter
YOUR SOURCE FOR OC SAN NEWS AND INFORMATION
NOVEMBER/DECEMBER2025
YOUR SOURCE FOR OC SAN NEWS AND INFORMATION
JULY/AUGUST2025
This year’s Take Your kid to Work daY
was the biggest one yet!
On Wednesday, July 30, OC San proudly welcomed over 200 children to our Headquarters for a fun-filled and educational day.
YOUR SOURCE FOR OC SAN NEWS AND INFORMATION
MARCH/APRIL2026
Gold Award: Erika Rizk, Plant Operator (Div. 830) — Control Center Drawing
Read more on page 15.Erika R.
GOLDWINNER
EMPLOYEEART CONTEST
27
INTERNAL PROJECTSEvent Branding
Logo
Certificate
Picture Backdrop
Table Tent
28
Logo and Background Graphic
INTERNAL PROJECTSEvent Branding
29
Signage
Event Map
INTERNAL PROJECTSEvent Branding
30
Headquarters Lobby Digital Display
Photo Booth Frame Giveaway - Pencil Pouch
INTERNAL PROJECTSEvent Branding
31
Er
i
k
a
R
.
OC
S
n
P
n
t
N
o
.
1
Co
n
t
r
o
C
e
n
t
e
r
GO
L
D
WI
N
N
E
R
EM
P
L
O
Y
E
E
AR
T
C
O
N
T
E
S
T
S
Y
L
F
O
S
Et
i
T
.
R
g
B
R
e
m
o
v
SI
L
V
E
R
WI
N
N
E
R
EM
P
L
O
Y
E
E
AR
T
C
O
N
T
E
S
T
S
Y
L
F
O
S
Lourdes L.
EMPLOYEEART CONTEST
OC Sn Pnt No. 1Tricking Fiter
BRONZEWINNER
SYL FO S
Erika R.
OC Sn Pnt No. 1Contro Center
GOLDWINNER
EMPLOYEEART CONTESTSYL FO S
Eti T.
Rg B Remov
SILVERWINNER
EMPLOYEEART CONTESTSYL FO S
Lo
u
r
d
e
s
L
.
EM
P
L
O
Y
E
E
AR
T
C
O
N
T
E
S
T
OC
S
n
P
n
t
N
o
.
1
Tr
i
c
k
i
n
g
F
i
t
e
r
BR
O
N
Z
E
WI
N
N
E
R
S
Y
L
F
O
S
Erika R.
OC Sn Pnt No. 1Contro Center
GOLDWINNER
EMPLOYEEART CONTESTSYL FO S
Eti T.
Rg B Remov
SILVERWINNER
EMPLOYEEART CONTESTSYL FO S
Lo
u
r
d
e
s
L
.
EM
P
L
O
Y
E
E
AR
T
C
O
N
T
E
S
T
OC
S
n
P
n
t
N
o
.
1
Tri
c
k
i
n
g
F
i
t
e
r
BR
O
N
Z
E
WI
N
N
E
R
S
Y
L
F
O
S
ART CONTEST
SYL FO S
BRONZE WINNER
LourdesLuna
ART CONTEST
SYL FO S
SILVER WINNER
Eti Taula
ART CONTEST
SYL FO S
GOLD WINNER
ErikaRizk
Get creative and showcase the often-unseen beauty of our infrastructure and operations. From pipes and pumps to clarifiers and digesters, this contest is all about highlighting the pride, creativity, and craftsmanship behind the work we do every day.
SYL FO S
AR
T
C
O
N
T
E
S
T
SUBMISSION PERIODFEB. 9-20Visit The San Box formore information.
A-Frame Certificates
Artwork Placards
INTERNAL PROJECTSEvent Branding
32
HolidayLuncheon
SAVE THE DATE
Holiday Table Tent Signage
Bridge Banner
INTERNAL PROJECTSEvent Branding
33
INTERNAL PROJECTSEnvironmental Design
Wall Graphic
34
BRANDING PROJECTSPromotional Items
35
2024
Asset Management Plan
Program
Year
2023 - 2024
Marine Monitoring
ANNUAL REPORT
EXTERNAL PROJECTSReports Cover Designs
36
2025
AssetManagement Plan 2026
BOARD OF DIRECTORS’Guide toBusiness
EXTERNAL PROJECTSReports Cover Designs
37
Investment Policy Adopted December 17, 2025
2025
Marine Monitoring
ANNUAL REPORT
Program
Year
2024 - 2025
EXTERNAL PROJECTSReports Cover Designs
38
2023/24
A N N U A L R E P O R T
O r a n g e C o u n t y S a n i t a t i o n D i s t r i c t
Years of Environmental Excellence
CAPITAL IMPROVEMENT PROGRAM
EXTERNAL PROJECTSReports Cover Designs
39
20
2
5
BIOSOLIDS MANAGEMENT COMPLIANCE REPORT
EPA 40 CFR Part 503
Orange County Sanitation District
BudgetSummary
Orange County Sanitation District, California
26-27FISCAL YEARS
27-28
EXTERNAL PROJECTSFull Report Designs
40
Driven by our Mission,
Powered by Innovation
A N N U A L
R E P O R T
EXTERNAL PROJECTSFull Report Designs
Page left intentionally blank
42
07/2026
PUBLIC AFFAIRS OFFICE18480 Bandilier Circle | Fountain Valley, CA 92708
www.ocsan.gov | forinformation@ocsan.gov | Follow us on social media @OCSanDistrict
7/1/2026
1
Public Affairs Strategic Plan
FY 2024-26 Summary
Presented by:
Jennifer Cabral, Director of Communications
Daisy Covarrubias, Public Affairs Supervisor
Administration Committee
July 8, 2026
Public
Affairs
Team
2
*Pr. Staff Analyst and VIPS
1
2
7/1/2026
2
•Employee Engagement
•Industry Experts
•Media Relations
•Agency Branding and
Messaging
•Educational Outreach
•Capital and Maintenance Outreach
•Legislative Affairs
What We Do
3
•Grant Coordination
•Local Government Affairs
•Crisis Management
•General Manager Support
What We Do
4
3
4
7/1/2026
3
Highlights from Fiscal Years 2024-2026
5
Overall, the District does an
excellent job of communicating
with employees…
Building on Success
6
5
6
7/1/2026
4
New Initiatives
7
More New Initiatives
8
7
8
7/1/2026
5
OC San’s New Video Library
9
•FY 2026-2028 Public Affairs Strategic Plan
•Building Trust
•Strengthening Partnerships
•Advancing OC San's Mission
Looking Ahead
10
9
10
7/1/2026
6
Recommend to the Board of Directors to:
Receive and file the Public Affairs Strategic Plan for Fiscal Years
2024 –2026 Summary.
Recommendation
11
11
ADMINISTRATION COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5019 Agenda Date:7/22/2026 Agenda Item No:14.
FROM:Robert Thompson, General Manager
Originator: Jennifer Cabral, Director of Communications
SUBJECT:
LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF JUNE 2026
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Receive and file the Legislative Affairs Update for the month of June 2026.
BACKGROUND
The Orange County Sanitation District’s (OC San)legislative affairs program includes advocating for
policy and legislative priorities,sponsoring legislation (where appropriate),and seeking local,state,
and federal funding for projects and programs.
RELEVANT STANDARDS
·Maintain influential legislative advocacy and a public outreach program
·Build brand, trust, and support with policy makers and community leaders
·Maintain collaborative and cooperative relationships with regulators,stakeholders,and
neighboring communities
PROBLEM
Without ongoing legislative engagement,elected officials may not be aware of OC San’s mission,
programs,and projects,or how proposed legislation may impact OC San operations and
infrastructure planning.
PROPOSED SOLUTION
Continue to work with Local,State,and Federal officials to advocate for OC San’s interests and help
identify,monitor,and respond to legislation and grant opportunities that benefit OC San,the
wastewater industry,and the community.To strengthen relationship building efforts,OC San will
continue to engage elected officials through facility tours,one-on-one meetings,and outreach trips to
Washington D.C. and Sacramento.
Orange County Sanitation District Printed on 7/13/2026Page 1 of 2
powered by Legistar™
File #:2026-5019 Agenda Date:7/22/2026 Agenda Item No:14.
RAMIFICATIONS OF NOT TAKING ACTION
If OC San does not actively engage with Local,State,and Federal elected officials,legislation could
be enacted that adversely impacts OC San and the wastewater industry.Additionally,a lack of
engagement may result in missed funding opportunities.
ADDITIONAL INFORMATION
Activities in June:
·On June 12,staff participated in the California Association of Sanitation Agencies (CASA)
State Legislative Committee to discuss proposed and current legislation,including potential
impacts on OC San and other wastewater agencies.
Upcoming Activities in July:
·OC San staff,subject matter experts,and lobbyists have started the process of updating the
2027 OC San Legislative and Regulatory Plan and will continue throughout the next couple of
months.The Plan is a guiding document that is presented annually to the Board of Directors
for adoption. Staff will present a draft plan to the Administration Committee in October 2026.
·OC San staff and lobbyists will continue their work on the September 18 State of OC San
luncheon event,which is slated to take place at OC San Headquarters.Invitations will go out
in August.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
CEQA
N/A
FINANCIAL CONSIDERATIONS
All items mentioned are included in OC San’s FY 2026-27 Adopted Budget.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Federal Legislative Update
·Federal Matrix
·State Legislative Update
·State Matrix
·Local Legislative Update
·Presentation
Orange County Sanitation District Printed on 7/13/2026Page 2 of 2
powered by Legistar™
ENS Resources, Inc.
1367 Connecticut Avenue N.W./Suite 310
Washington, D.C. 20036 / Telephone (202) 466-3755
www.ensresources.com
TO: Orange County Sanitation District
FROM: Eric Sapirstein
DATE: June 19, 2026
SUBJECT: Washington Update
Over the past month, congressional and U.S. Environmental Protection Agency
(USEPA) activities have advanced several policy and regulatory priorities of interest
to OC San. The USEPA Administrator Lee Zeldin held a joint briefing with the
Department of Health and Human Services Secretary RFK, Jr. to outline a
commitment to address PFAS impacts on public health and the environment. In
tandem with the briefing, the USEPA published two proposed per- and
polyfluoroalkyl substances (PFAS) rules. The first would extend the water agency
treatment compliance deadline for perfluorooctanoic acid (PFOA) and
perfluorooctane sulfonic acid (PFOS) maximum contaminant levels to 2031 from the
current 2029 deadline. The extension would be based on a review of a water
agency’s circumstances. The second rule would rescind drinking water standards
for four additional PFAS compounds and GEN-X (GenX is a trade name for a
synthetic chemical belonging to PFAS class.
In Congress, progress on the Fiscal Year 2027 appropriations occurred in the House
as the Committee on Appropriations approved USEPA’s budget, clearing the bill for
House floor action later this spring. As approved on a party line vote EPA would be
cut by approximately 20 percent below the FY 2026 enacted level.
Separately, the U.S. Government Accountability Office (GAO) testified before the
House Committee on Science, Space, and Technology on growing concerns over
cybersecurity threats to the water sector. Lastly, efforts to legislate passive
receivers liability protections for the water sector related to EPA’s designation of
PFAS under the Comprehensive Environmental Response, Compensation, and
Liability Act (CERCLA) continues. Members on the House and Senate committees
with jurisdiction over CERCLA are attempting to develop a passive receivers liability
exemption. If successful, agencies like OC San, would be protected from frivolous
litigation from Potentially Responsible Parties that seek to shift PFAS clean-up
burdens on to the public simply because an agency had to treat the PFAS
contaminated wastewaters.
ENS Resources, Inc.
1367 Connecticut Avenue N.W./Suite 310
Washington, D.C. 20036 / Telephone (202) 466-3755
www.ensresources.com
The following summarizes key issues of interest.
FY 2027 Appropriations: EPA Water Infrastructure Programs
The House Committee on Appropriations approved EPA’s FY27 spending bill. The
bill would cut EPA by approximately $1.8 billion (twenty percent) below the
enacted FY26 level. Despite the overall EPA reduction, the bill retains grant funding
flowing directly to states and tribes for water infrastructure and continues
Community Project Funding for EPA Clean Water and Drinking Water State
Revolving Fund (SRF) projects. Although the overall SRF account would be reduced
by approximately $100 million, the committee agreed to provide $2 billion for the
FY27 SRF Capitalization Grants Account. However, as part of the committee action,
the SRF would fund Community Project Requests providing $506 million for water
and $526 million wastewater projects, reducing the SRF capitalization grants by like
amounts.
Importance of Committee Action
While OC San does not rely upon the SRF, the continued funding maintains the
federal partnership to support communities meet federal water quality mandates.
For California, if the funding level is enacted, the State would receive approximately
$72 million in SRF Capitalization Grant assistance in the coming fiscal year.
EPA Preparing to Issue Biosolids Land Application Guidance and Effluent
Limitation Guidelines for Industry Related to PFAS
The Office of Water is expected to issue guidance to the States on how to set
standards to address PFAS in biosolids. The guidance reportedly will provide for a
tiered approach to set acceptable levels of PFAS that may be present in biosolids and
establish a scientifically defensible approach to managing continued land
application of biosolids while protecting public health and the environment.
The EPA is also preparing to issue long delayed effluent limitation guidelines
(ELG’s)that would require industrial dischargers to treat for PFAS before
discharging effluent. The expectation is the ELG’s would lead to source control of
PFAS and reduce the presence in wastewaters that agencies like OC San must treat.
Importance of Guidance and ELG’s
EPA’s anticipated actions are important for two reasons. First, the biosolids land
application guidance will bring clarity on how to assess risk assessments related to
land application. The original draft Risk Assessment Model that was issued in the
final two weeks of the Biden Administration received more than 24,000 public
comments. Many of the comments cited the model’s deficiencies and lack of sound
science upon which biosolids management decisions would be made. The issuance
of ELG’s will for the first time put in place standards to reduce PFAS wastewater
discharges from industry. When finalized, the ELG’s should support efforts to
reduce the burden and costs imposed on wastewater agencies to treat these sources
of PFAS.
ENS Resources, Inc.
1367 Connecticut Avenue N.W./Suite 310
Washington, D.C. 20036 / Telephone (202) 466-3755
www.ensresources.com
EPA PFAS Drinking Water Rule: Proposed Rescission and Compliance Extension
On May 18, the EPA announced two proposed rules under the Safe Drinking Water
Act related to PFAS in drinking water. In taking this action, EPA stated that it would
re-examine the need to regulate the PFAS compounds once the rules are finalized.
The first proposed rule would roll back or rescind the drinking water maximum
contaminant levels (MCLs) for four PFAS compounds established under the Biden
Administration’s April 2024 National Primary Drinking Water Regulation
perfluorohexane sulfonic acid (PFHxS), perfluorononanoic acid (PFNA),
hexafluoropropylene oxide dimer acid (HFPO-DA, commonly known as GenX). As
part of this action, the agency would rescind the Hazard Mixture Index (Index)that
would have set a treatment standard for any mixture of these three PFAS and other
future chemicals. EPA stated that the prior rule failed to follow the statutory
requirements of the Safe Drinking Water Act in establishing the standards. Under
the law, the agency must regulate on a chemical by chemical basis and not the novel
Index approach that the Biden EPA relied upon to issue the MCL.
The second proposed rule upholds the existing 4 parts per trillion MCL for PFOA and
PFOS that EPA also issued under the Biden EPA. However, EPA is now proposing to
allow public water systems to apply for a two-year compliance extension, extending
the compliance deadline from 2029 to 2031.
Regardless of the court challenge EPA has scheduled a virtual public hearing on July
7, 2026, to receive verbal comments. The public hearing will address both rules.
The deadline to pre-register to provide verbal comment is July 1, 2026.
Importance of EPA Actions
EPA’s decision to rescind the standards related to additional PFAS chemicals is
important. It recognizes the agency failed to follow the law in relying upon a
“hazard mixture index” approach to set a treatment standard. If the rescission
withstands expected court challenges, it will require documented science on the
public health threats from each chemical. The other action includes reaffirming the
4 parts per trillion MCL for PFOS and PFOA, to allow for an extended compliance
date of an additional two years is important because if a water agency can make a
compelling case for additional time, it would help to address affordability impacts.
Water Sector Cybersecurity: Congressional Hearing and GAO Testimony
On May 21, 2026, the Government Accountability Office (GAO) testified before the
House Committee on Science, Space, and Technology’s Subcommittee on the
Environment at a hearing titled “Research-Driven Resilience: Applying Science to
Secure U.S. Water Systems from Cyber Threats.” GAO testified that threat actors,
including state-sponsored hackers and criminal groups, are increasingly capable of
cyberattacks on water systems, in part because operational technologies that
control valves, pumps, and other physical infrastructure are increasingly connected
to internet-enabled devices. GAO also noted that gaps in EPA’s capacity to assess
and support water sector cybersecurity needs.
GAO warned directly in its testimony that the proposed reductions to the
Department of Homeland Security’s Cybersecurity and Infrastructure Security
Agency budget may limit the federal government’s ability to support water and
wastewater system resilience and cybersecurity efforts.
ENS Resources, Inc.
1367 Connecticut Avenue N.W./Suite 310
Washington, D.C. 20036 / Telephone (202) 466-3755
www.ensresources.com
Importance of GAO Testimony
Water and wastewater agencies are facing growing cybersecurity requirements
under the America’s Water Infrastructure Act, while federal resources that support
threat assessment and remediation efforts face potential reductions. Recent GAO
testimony underscored the water sector’s vulnerability to cyberattacks and the
importance of maintaining robust cybersecurity defenses for critical infrastructure.
As Senator Schiff develops water sector legislation, there is an opportunity to
provide targeted funding and resources that would help utilities meet federal
requirements and strengthen cybersecurity resilience.
Copy of OC San Federal Legislative Update
July 2026
FEDERAL - 119TH CONGRESS
S. 4603
Golden Mussel Eradication and
Control Act of 2026
No Priority No Stance
Summary: S. 4603 would create a pilot program to investigate the availability
of control and eradication technologies to address the growing threats from
the Golden Mussel. A task force would be created to develop the
demonstration program that would conduct R&D into impacts upon fisheries,
water quality, and ecosystems. The task force would also support development
of control and eradication methods and plans to address impacts upon public
infrastructure among other matters. The program would be targeted to
Sacramento-San Joaquin Delta and other waters as determined by the task
force.
Introduced: 05/20/2026
Sponsor: Sen. Adam Schiff CA
Latest Actions:
05/20/2026 - Read twice and referred to the Committee on Environment and
Public Works.
05/20/2026 - Introduced in Senate
Committees: Senate Environment and Public Works Committee
Why it matters: S.4603 is the Senate approach to the investigation and mitigation efforts
to address the invasive Golden Mussel that threatens wastewater and water agencies'
infrastructure. S. 4603 is similar to H.R.3717 introduced by Harder (D-CA).
Outlook: Senate action on the bill is considered highly likely either as a stand alone
measure or incorporation into a broader Water Resources Development Act or Clean
Water/Safe Drinking Water Acts reauthorization.
Why it matters: The legislation would provide important protection to water and wastewater
agencies against third party litigation seeking to secure cost contributions for cleanups that
involve PFAS contamination. Absent an explicit liability protection provision such agencies
would be exposed to liability simply because an agency treated water and wastewater that
contained PFAS chemicals and disposed of residuals and biosolids.
Outlook: H.R. 1267 represents a placeholder bill to address the water sector's concerns
over the potential liability created by USEPA's designation of PFAS as a hazardous
substance under CERCLA. Both the House and Senate committees with jurisdiction over
CERCLA have expressed interest in addressing PFAS liability. We expect that
congressional action could later this summer on H.R. 1267 or other initiatives that would
address nuisance litigation.
FEDERAL - 119TH CONGRESS
H.R. 1285
Water Infrastructure
Subcontractor and Taxpayer
Protection Act of 2025
No Priority No Stance
Summary: H.R. 1285 would amend the Water Infrastructure Finance and
Innovation Act of 2014. The key points: Payment and Performance Security
Requirements: The bill establishes new requirements for payment and
performance security for projects funded under the act. Project Funding:
Ensure that projects financed through the Water Infrastructure Finance and
Innovation Act have adequate financial safeguards.
Introduced: 02/13/2025
Sponsor: Rep. Mike Bost IL-12
Latest Actions:
02/13/2025 - Referred to the Subcommittee on Water Resources and
Environment.
FEDERAL - 119TH CONGRESS
H.R. 1267
Water Systems PFAS Liability
Protection Act
High Priority Support
AI Summary: The Water Systems PFAS Liability Protection Act exempts water
and wastewater treatment facilities from CERCLA liability for releases of
certain perfluoroalkyl and polyfluoroalkyl substances, provided they comply
with applicable laws and regulations.
Introduced: 02/12/2025
Sponsor: Rep. Marie Gluesenkamp Perez WA-03
Latest Actions:
02/12/2025 - Referred to the Subcommittee on Water Resources and
Environment.
02/12/2025 - Referred to the Committee on Energy and Commerce, and in
addition to the Committee on Transportation and Infrastructure, for a period …
02/12/2025 - Referred to the Committee on Energy and Commerce, and in
addition to the Committee on Transportation and Infrastructure, for a period …
Committees: House Energy and Commerce Committee, House Transportation
and Infrastructure Committee, House Transportation and Infrastructure
Committee Water Resources and Environment Subcommittee
02/13/2025 - Referred to the Committee on Transportation and Infrastructure,
and in addition to the Committee on Energy and Commerce, for a period to b…
02/13/2025 - Referred to the Committee on Transportation and Infrastructure,
and in addition to the Committee on Energy and Commerce, for a period to b…
Committees: House Energy and Commerce Committee, House Transportation
and Infrastructure Committee, House Transportation and Infrastructure
Committee Water Resources and Environment Subcommittee
FEDERAL - 119TH CONGRESS
S. 857
Water Conservation Rebate Tax
Parity Act
No Priority No Stance
Summary: Amends federal tax law so that homeowners would not need to pay
income tax when they receive rebates from water utilities for water
conservation and water runoff management improvements. S. 857.
Introduced: 03/05/2025
Sponsor: Sen. John Curtis UT
Latest Actions:
03/05/2025 - Read twice and referred to the Committee on Finance.
03/05/2025 - Introduced in Senate
Committees: Senate Finance Committee
FEDERAL - 119TH CONGRESS
H.R. 2269
WIPPES Act
High Priority Support
Summary: H.R. 2269 would direct the Federal Trade Commission to estabilsh
federal "Do Not Flush" labeling requirements for nonflushable wet wipes
packaging. The labeling requirements would be enacted one year after the
bill's enactment. The bill mirrors California's state labeling law and is
supported by clean water, industry, environmental advocates, and civil
engineer stakeholders. Senate companion legislation is S. 1092.
Introduced: 03/21/2025
Sponsor: Rep. Lisa McClain MI-09
Latest Actions:
06/24/2025 - Received in the Senate.
06/23/2025 - Motion to reconsider laid on the table Agreed to without
objection.
06/23/2025 - On motion to suspend the rules and pass the bill Agreed to by
voice vote. (text: CR H2852-2853)
Committees: House Energy and Commerce Committee
Why it matters: H.R. 2269 provides a source control solution to the problem of the flushing of
nonflushable wipes that will reduce costs associated with fixing damaged treatment
infrastructure for wastewater utilities. The labeling requirements compliment existing "Do Not
Flush" labeling state law. Rep. Lou Correa is a co-sponsor. OC San continues to publicly
support the effort and has sent support letters to the delegation this Congress.
Outlook: Final passage of the WIPPES Act is anticipated with the House accepting the
Senate passed version to avoid the need for a formal conference committee that would
delay final enactment. (see S. 1092 below)
FEDERAL - 119TH CONGRESS
S. 1092
WIPPES Act
High Priority Support
Summary: S.1092 would direct the Federal Trade Commission to estabilsh
federal "Do Not Flush" labeling requirements for nonflushable wet wipes
packaging. The labeling requirements would be enacted one year after the
bill's enactment. The bill mirrors California's state labeling law and is
supported by clean water, industry, environmental advocates, and civil
engineer stakeholders. House companion legislation is HR 2269.
Introduced: 03/24/2025
Sponsor: Sen. Jeff Merkley OR
Latest Actions:
03/24/2026 - Held at the desk.
03/24/2026 - Received in the House.
03/24/2026 - Message on Senate action sent to the House.
Committees: Senate Commerce, Science and Transportation Committee
Why it matters: S. 1092 provides a source control solution to the problem of the flushing of
nonflushable wipes that will reduce costs associated with fixing damaged treatment
infrastructure for wastewater utilities. The labeling requirements compliment existing "Do Not
Flush" labeling state law. Senator Alex Padilla is an original co-sponsor. OC San continues to
publicly support the effort and has sent support letters to the delegation this Congress.
Outlook: S. 1092 passed the Seante by unanimous consent. The bill was referred to the
House. House action to accept the Senate version of the WIPPES Act is anticipated.
House acceptance of the Senate-passed version could occur in June/July. (See above)
FEDERAL - 119TH CONGRESS
H.R. 2344
Water ISAC Threat Protection
Act
No Priority No Stance
Summary: Would establish a program to enhance the preparedness and
resilience of drinking water and wastewater systems against various threats.
The bill's primary focus is on safeguarding these critical utilities from risks
such as natural disasters, cyberattacks, and other vulnerabilities that could
disrupt essential water services.
Introduced: 03/25/2025
Sponsor: Rep. Jan Schakowsky IL-09
Latest Actions:
03/25/2025 - Referred to the Subcommittee on Water Resources and
Environment.
03/25/2025 - Referred to the Committee on Transportation and Infrastructure,
and in addition to the Committee on Energy and Commerce, for a period to b…
03/25/2025 - Referred to the Committee on Transportation and Infrastructure,
and in addition to the Committee on Energy and Commerce, for a period to b…
Committees: House Energy and Commerce Committee, House Transportation
and Infrastructure Committee, House Transportation and Infrastructure
Committee Water Resources and Environment Subcommittee
FEDERAL - 119TH CONGRESS
S. 1118
Water Intelligence, Security, and
Cyber Threat Protection Act of
2025
No Priority No Stance
Summary: S. 1118 would provide funding and additional access for clean
water and wastewater utilities to become members of the Water Information
Sharing and Analysis Center (WaterISAC). The WaterISAC is a critical source
of information and best practices for water systems to protect against,
mitigate, and respond to threats. House Companion bill H.R. 2344. Endorsed by
American Water Works Association, Association of Metropolitan Water
Agencies, National Association of Clean Water Agencies, National Association
of Water Companies, and Water Environment Federation.
Introduced: 03/25/2025
Sponsor: Sen. Ed Markey MA
Latest Actions:
03/25/2025 - Read twice and referred to the Committee on Environment and
Public Works.
03/25/2025 - Introduced in Senate
Committees: Senate Environment and Public Works Committee
Why it matters: H.R. 3898 represents a comprehensive Clean Water Act permitting reform bill.
Key provisions:
• mandates 10 year NPDES permits
• codifies exemption from WOTUS definition for wastewater and water storage facilities
• expedites review and approval of section 404 permit applications (dredge and fill)
• provides ten year general permits for dredge and fill activities with requirement for 2 year
advanced notification if permit not to be renewed
FEDERAL - 119TH CONGRESS
H.R. 3184
PFAS Alternatives Act
No Priority No Stance
AI Summary: The bill establishes a research and training program to develop
PFAS-free turnout gear for firefighters, supporting innovation and safer
protective equipment through grants and partnerships.
Introduced: 05/05/2025
Sponsor: Rep. Debbie Dingell MI-06
Latest Actions:
05/06/2025 - Referred to the Subcommittee on Water Resources and
Environment.
05/05/2025 - Referred to the Committee on Science, Space, and Technology,
and in addition to the Committee on Transportation and Infrastructure, for a…
05/05/2025 - Referred to the Committee on Science, Space, and Technology,
and in addition to the Committee on Transportation and Infrastructure, for a…
Committees: House Science, Space and Technology Committee, House
Transportation and Infrastructure Committee, House Transportation and
Infrastructure Committee Water Resources and Environment Subcommittee
FEDERAL - 119TH CONGRESS
H.R. 3898
PERMIT Act
No Priority No Stance
AI Summary: The PERMIT Act amends the Federal Water Pollution Control Act
to streamline water quality standards, improve transparency in criteria
development, reduce regulatory burdens, and enhance permitting efficiency
for infrastructure and agricultural projects.
Introduced: 06/11/2025
Sponsor: Rep. Mike Collins GA-10
Latest Actions:
12/15/2025 - Received in the Senate and Read twice and referred to the
Committee on Environment and Public Works.
12/11/2025 - Motion to reconsider laid on the table Agreed to without
objection.
12/11/2025 - On passage Passed by the Yeas and Nays: 221 - 205 (Roll no.
330).
Committees: House Transportation and Infrastructure Committee, House
Transportation and Infrastructure Committee Water Resources and
Environment Subcommittee, Senate Environment and Public Works Committee
• limits water quality certification reviews to project impacts on water quality (no down
stream impacts or non-water quality related impacts)
Outlook. H.R. 3898's provisions could be incorporated into a broader permitting reform
bill that addresses both energy and environmental permit mandates. As of this writing,
the Senate Committees on Environment and Public Works and Energy and Natural
Resources are negotiating on a bipartisan measure that would enhance prospects of
final passage of H.R. 3898's permit terms provisions.
Why it matters: S. 3738 would extend the authorization of the expiring large water recycling
projects ($500 million or greater) program. Authorized funding would be $450 million and the
program would be extended until 2032. It would also modify the the Title XVI program
increasing federal cost share to $50 million, providing $550 million funding authorization and
extending program to 2032. A new program authorizing $250 million to support
environmental and habitat restoration projects would be available to support the Great Salt
Lake and other inland lakes (priority on Central Utah Project.
Outlo0k: The legislation received a positive hearing before the Committee on Energy and
Natural Resources. USBR testified positively on the bill. S. 3738 could become part of a
larger western water resources bill later in the year.
FEDERAL - 119TH CONGRESS
S. 3738
MORE WATER Act
No Priority No Stance
AI Summary: The MORE WATER Act reauthorizes the large-scale water
recycling and reuse program, establishes a Water Conveyance Improvement
Program, and provides funding for projects that deliver water supply, safe
drinking water for low-income communities, and environmental benefits.
Introduced: 01/29/2026
Sponsor: Sen. Alex Padilla CA
Latest Actions:
03/17/2026 - Committee on Energy and Natural Resources Subcommittee on
Water and Power. Hearings held.
01/29/2026 - Read twice and referred to the Committee on Energy and Natural
Resources. (Sponsor introductory remarks on measure: CR S380-381)
01/29/2026 - Introduced in Senate
Committees: Senate Energy and Natural Resources Committee, Senate Energy
and Natural Resources Committee Water and Power Subcommittee
Why it matters: The legislation would increase the federal cost share cap for the WIFIA
Program from the current 80% to 90% for projects that are located in areas of extreme drought,
projects of national significance, or serves disadvantaged communities. By raising the federal
cap for these categories of eligible projects, H.R. 7845 aims to help address concerns about
Western water supplies resiliency due to prolonged drought conditions. Importantly, the bill
does not change borrowers' obligations, payment plans, or interest rates under WIFIA.
Outlook: H.R. 7845 has been referred to the Committee on Transportation and
Infrastructure. While the issue of Western water supply security continues to be a focus for
lawmakers in the 119th Congress, the committee is currently focused primarily on drafting
and advancing the Water Resources Development Act of 2026 (WRDA) later this summer.
As a result, committee consideration on H.R. 7845 will likely be delayed until the summer at
the earliest.
FEDERAL - 119TH CONGRESS
H.R. 7845
DROUGHT Act of 2026
AI Summary: The DROUGHT Act of 2026 modifies the Water Infrastructure
Finance and Innovation Act to limit federal assistance for drought-affected
water projects to 90% of total project costs, prioritizing projects in severely
drought-affected states or counties, low-income areas, or those providing
significant public health, environmental, or water reliability benefits.
Introduced: 03/05/2026
Sponsor: Rep. Scott Peters CA-50
Latest Actions:
03/06/2026 - Referred to the Subcommittee on Water Resources and
Environment.
03/05/2026 - Referred to the Committee on Transportation and Infrastructure,
and in addition to the Committee on Energy and Commerce, for a period to b…
03/05/2026 - Referred to the Committee on Transportation and Infrastructure,
and in addition to the Committee on Energy and Commerce, for a period to b…
Committees: House Energy and Commerce Committee, House Transportation
and Infrastructure Committee, House Transportation and Infrastructure
Committee Water Resources and Environment Subcommittee
CALIFORNIA ADVOCACY • FEDERAL ADVOCACY • GRANT WRITING
Sacramento • Washington, D.C.
Northern California • Central • California • Southern California
MONTHLY LEGISLATIVE UPDATE
To: Orange County Sanitation District
From Townsend Public Affairs
Date: June 19, 2026
Subject: June 2026 Legislative Monthly Report
STATE UPDATE
May and June represent one of the most consequential periods in California’s legislative
calendar, marked by major policy deadlines and the budget process. It serves as both the
deadline for bills to pass their House of Origin and the point at which the Governor releases
the annual "May Revise" budget proposal. It also precedes the constitutional deadline of June
15th by which the Legislature must pass a state budget. Under the provisions of Proposition
25, approved by voters in 2010, Members of the Legislature permanently forfeit their daily
salaries for each day the budget remains overdue after June 15. As a result, it has become
common practice for the Legislature to approve and transmit a framework budget to the
Governor by the constitutional deadline, allowing negotiations on remaining details to continue.
The budget approved on June 15 serves as a broad fiscal framework rather than a final spending
plan. Following its passage, the Senate, Assembly, and Governor continue negotiations over
outstanding policy and fiscal issues. Once an agreement is reached, the Governor must sign
the finalized budget package before the start of the new fiscal year on July 1. Additional details
and implementation provisions are then negotiated and enacted through a series of budget
trailer bills throughout the remainder of the legislative session.
As approved, the Legislature’s budget framework is projected to remain balanced through Fiscal
Year 2027–28 and significantly reduces the state's long-term structural deficit to below $10
billion. The Legislature’s proposal includes $355.9 billion in total expenditures for Fiscal Year
2026–27, including:
• $253 billion from the General Fund.
• $36.5 billion in total reserves, including:
o $4.5 billion in the Special Fund for Economic Uncertainties (Regular Reserve);
o $15.1 billion in the Budget Stabilization Account (Rainy Day Fund);
o $9.5 billion in the Proposition 98 Rainy Day Fund; and
o $7.4 billion set aside for Fiscal Year 2027–28.
Page 2
Revenue Proposals
The Legislature’s budget framework also includes several revenue-related proposals, including:
• Fair Share from Large Corporations
o In response to federal funding reductions included in H.R. 1, the Legislature
incorporated budget language requiring the Governor to present fully developed
policy options by April 1, 2027, for holding large corporations accountable for a
greater share of their employees’ healthcare costs. These options will be
considered during the next budget cycle. Any implementation of such proposals
would require subsequent legislative action.
• A federally compliant Managed Care Organization tax; and
• An expansion of the sales tax to certain prewritten software products. The software
proposal would apply the state sales tax to many commonly used software
subscriptions, including products such as Slack and Microsoft Office suites, beginning
in January 2027.
New revenue sources remain difficult to identify in periods of economic uncertainty. Voter
sentiment appears cautious regarding additional taxation, as reflected in the number of local tax
measures rejected during the June primary election. However, unlike local tax increases, the
revenue proposals contained in the state budget do not require voter approval and may be
enacted with a two-thirds vote of each house of the Legislature.
Given the volatility of California’s revenue structure—particularly its dependence on capital
gains and stock market performance—the Legislature and Governor are also discussing
potential changes to the state’s reserve policies.
Under current law, state leaders are constitutionally required to make annual deposits into the
Budget Stabilization Account; however, the account balance may not exceed 10 percent of
General Fund tax revenues. Policymakers are now considering whether that cap should be
increased to allow the state to save more revenue during strong economic years and better
prepare for future downturns.
Because the reserve cap was established in the California Constitution, any change would
require voter approval. Legislative leaders are currently considering a ballot measure for the
November election that would authorize a higher reserve limit. To qualify such a measure for
the ballot, lawmakers face a June 25 deadline to finalize the proposal.
CAP AND INVEST
Beyond the budget, one of the most significant developments this month was major regulatory
changes to the state’s Cap-and-Invest Program. The California Air Resources Board (CARB)
proposed and adopted sweeping changes to the program, despite it having been negotiated
and codified in SB 840 last year.
In 2024, CARB determined that it had underestimated the amount of greenhouse gas reductions
required of regulated industries by approximately 118 million metric tons. Rather than requiring
emitters to achieve those additional reductions, CARB adopted regulations that effectively
provide the equivalent of 118 million metric tons in free allowances to regulated entities.
Consequently, 118 million fewer allowances will be available for auction.
Page 3
The implications of CARB’s Cap-and-Invest changes extend well beyond climate policy and
could have significant consequences for water and sanitation infrastructure funding throughout
California, including challenges for opportunities to include new funding for programs such as
innovative biosolids management, of importance of OC San.
This growing uncertainty places increased importance on other available state funding sources,
particularly Proposition 4. As traditional funding streams come under pressure, Proposition 4
may represent one of the Legislature’s most significant remaining tools to support water
infrastructure, drinking water reliability, groundwater sustainability, and climate resilience
projects. Legislative leaders are expected to begin substantive discussions regarding
Proposition 4 implementation following their return from Summer Recess in August, making the
coming months particularly important for water agencies seeking clarity on future funding
opportunities.
While details of Proposition 4 are still outstanding, the Governor has asked the State Legislature
to allocate $2.1 billion in funding, including $792 million for water-related programs and
$326 million for clean energy programs. Unlike the Governor’s initial 2025-26 proposal, in
general, the budget does not propose a multiyear spending plan for Proposition 4. The
administration instead indicates that, in response to feedback from the Legislature, it would like
to submit programmatic bond funding proposals on a year-by-year basis. Final details on
funding and funding mechanisms, though, will be decided in August.
TPA continues to advocate for funding opportunities that would benefit OC San.
KEY STATE LEGISLATION
The following summarizes key legislation that OC San has taken positions on:
OC San staff and Townsend Public Affairs monitor current and upcoming legislation. Per the
Page 4
Board approved Legislative and Regulatory Plan, OC San has submitted five position letters:
Assembly Bill 1621 (Wilson) – Planning and Zoning Law: Housing Accountability Act
Summary: AB 1621 proposes changes to the post-entitlement permitting process for housing
development projects. The bill would limit building permit plan check reviews to two rounds,
modify review timelines and related provisions, and restrict agencies from requiring changes
during inspections that deviate from previously approved plans unless specified findings are met.
Status: AB 1621 has been referred to the Assembly Housing Committee
OC San Position: Oppose Unless Amended. Page 24, section K (H) of Legislative and Regulatory
Plan
Assembly Bill 2180 (Ward) - Proposition 218 Omnibus Implementation Act
Summary: AB 2180 clarifies how local governments may demonstrate compliance with the
constitutional requirement that fees do not exceed the proportional cost of service. The bill allows
agencies to use any reasonable method to allocate service costs among parcels, supported by
existing or reasonably estimated data. The bill is sponsored by ACWA.
Status: AB 2180 has passed the Senate and will be heard next on the Senate Floor.
OC San Position: Support. Page 24, section K (h) of the Legislative and Regulatory Plan
Assembly Bill 2381 (Johnson) - Local Agency Public Construction Act: Municipal Water
Districts: Sanitation Districts: Lowest Responsible Bidder
Summary: AB 2381 amends the Local Agency Public Construction Act to update competitive
bidding requirements for municipal water districts and sanitation districts. Specifically, the
measure increases the threshold for public works contracts that must be awarded to the lowest
responsive and responsible bidder from $35,000 to $220,000.
Status: AB 2381 died in the Assembly and is not moving forward.
OC San Position: Support. Page 23 section J (e) of the Legislative and Regulatory Plan and is
consistent with previous bill concepts that TPA has discussed with OC San staff and the Board.
Assembly Bill 2777 (ESTM Committee) – State Water Pollution Control Revolving Fund
program: loans: water reuse
Summary: AB 2777, sponsored by CASA and WateReuse, this bill would provide additional
flexibility for the State Water Resources Control Board to modernize the Clean Water State
Revolving Fund (CWSRF) loan program. The bill would authorize the state board to assess fees
in place of an annual charge for financial assistance and would authorize the fees or annual
charge to be assessed at any rate as permitted by federal law.
Status: AB 2777 will be heard in the Senate Environmental Safety and Toxic Materials Committee
on June 17.
OC San Position: Support an industry coalition letter. Page 23, section D (A) and section E (c) of
Page 5
the Legislative and Regulatory Plan.
Senate Bill 1117 (Cervantes) - Accessory Dwelling Units and Junior Accessory Dwelling
Units
Summary: SB 1117 would restrict how local agencies calculate impact fees for accessory dwelling
units (ADUs) by requiring that fees for units exceeding 750 square feet be based only on the
portion of the unit above that threshold, rather than the entire unit.
Status: SB 1117 has been referred to the Assembly Local Government Committee.
OC San Position: Oppose Unless Amended. Page 24, section K (H) of Legislative and Regulatory
Plan
OC San
State
Bills of Interest
BILL AUTHOR SUMMARY LATEST ACTION OC SAN
POSITION LEGISLATIVE PLAN OTHER
POSITIONS
AB 35 Alvarez [D]This legislation, would exempt the adoption of regulations needed to effectuate or implement
programs of the act from the requirements of the Administrative Procedure Act (APA). The bill
would require a state entity that receives funding through Proposition 4 to administer a
competitive grant program established using the Administrative Procedure Act exemption to do
certain things, including develop draft project solicitation and evaluation guidelines and to submit
those guidelines to the Secretary of the Natural Resources Agency, except as provided. The bill
would require the Secretary of the Natural Resources Agency to post an electronic form of the
guidelines submitted by a state entity and the subsequent verifications on the Natural Resources
Agency’s internet website.
Referred to Senate Appropriations
Committee
Watch Legislative and Regulatory Policies: Grant
Funding – Oppose proposals placing further
requirements on grant recipients that return low value
for high administrative costs
ACC-OC - NYC
LOCC - Support
CASA - Support
CSDA - NYC
ACWA - Support
AB 634 Gonzalez [R]The legislation intends to add tianeptine to the Schedule I category of controlled substances,
reflecting the highest level of legal restriction. This action is intended to limit the potential misuse
and abuse of the substance by prohibiting its manufacture and sale unless explicitly allowed. The
bill emphasizes the importance of this classification to curb the substance's availability and
mitigate associated risks to public health.
Referred to Senate Health and
Senate Judiciary Committee
Watch Legislative and Regulatory Policies Source
Control – Support legislation, regulations, and
funding assistance that would lead to decreased
introduction of microplastics, and other contaminants
of concern discharged into the sewer system.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 643 Wilson [D]AB 643 mandates a 75 percent reduction in organic waste disposal to landfills by 2025 to
combat methane emissions. The bill tasks the Department of Resources Recycling and
Recovery, along with the State Air Resources Board, with formulating associated regulations.
Local jurisdictions are empowered to utilize organic materials as agricultural soil amendments to
meet these goals, provided they follow specific guidelines. This approach aims to enhance
California's climate resilience through sustainable waste management practices.
Referred to Senate Environmental
Quality Committee
Watch Legislative and Regulatory Policies: Special
Districts – Oppose further state regulations that
adversely impact special district financing, operations,
and administration.
ACC-OC - NYC
LOCC - Watch
CASA - Support in
concept
CSDA - Watch
ACWA - NYC
AB 748 Harabedian [D]AB 748 authorizes the development and use of preapproved single‑family and multifamily
housing plans that local agencies may adopt to expedite housing approvals and reduce
duplicative design review. The bill adds Section 65852.29 to the Government Code, allowing a
property owner to build housing consistent with a jurisdiction’s preapproved plan without
undergoing additional design review, provided the housing meets the criteria of the adopted plan.
This aims to accelerate production of housing units while maintaining local standards for design
and land use, reducing processing time and cost for both agencies and developers. The bill is
intended to support increased housing supply and consistency in planning approaches across
jurisdictions.
Referred to Senate Local
Government and Senate Housing
Watch Legislative and Regulatory Policies: Housing &
Infrastructure Planning – Support statewide efforts
to improve housing production and planning efficiency
while protecting local infrastructure planning authority
and avoiding unfunded mandates.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 1198 Haney [D]Beginning July 1, 2027, changes in prevailing wages by the Director of Industrial Relations will
affect contracts awarded or announced after this date. Affected parties can request a review
within 20 days, with a final decision issued within 20 days thereafter. Certain housing projects are
exempt from these updates.
Referred to Senate Appropriations
Committee
Watch Legislative and Regulatory Policies: Special
Districts – Oppose further state regulations that
adversely impact special district financing, operations,
and administration.
ACC-OC - NYC
LOCC - Oppose
CASA - Watch
CSDA - NYC
ACWA - NYC
AB 1337 Ward [D]Gut and amended on June 1. AB 1337 would significantly revise the Information Practices Act of
1977 by removing the exemption for local agencies, expanding the definition of personal
information, strengthening notice and conduct requirements, broadening limits on disclosure, and
adding discipline and criminal penalties for certain violations.
Referred to Senate Privacy,
Digital Technologies, and
Consumer Protection Committee
Watch Local Government - Oppose state mandates,
regulations, or legislation that set, alter, or otherwise
modify the
governance structure of special districts, joint powers
authorities, or other local government
entities.
ACC-OC - NYC
LOCC - Oppose
CASA - Oppose
CSDA - NYC
ACWA - NYC
AB 1383 McKinnor [D]AB 1383 revises the pensionable compensation limits for public retirement systems in
accordance with federal guidelines starting January 1, 2027. It introduces new retirement
formulas for safety members, allowing for collective bargaining agreements to adjust these
formulas. This bill supports the alignment of state retirement benefits with federal standards and
facilitates negotiation over pension terms.
Referred to Senate Labor, Public
Employment, and Retirement
Committee
Watch Legislative and Regulatory Policies: Labor
Relations/Human Resources – Oppose any
measure that imposes upon local government
mandated employee benefits that
are more properly decided at the local bargaining
table.
ACC-OC - NYC
LOCC - Oppose
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 1617 Alanis [R]AB 1617 requires public agencies and contractors handling household hazardous waste to
submit the Form 303 Household Hazardous Waste Collection Report annually for the prior
calendar year, aligning the reporting period with the calendar year. This shift aims to improve the
consistency and accuracy of hazardous waste tracking.
Referred to Senate Environmental
Quality Committee
Watch Legislative and Regulatory Policies: Biosolids,
Organics, and Biogas – Limit redundant reporting
requirements on organics, recyclable material, and
solid waste.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
Proposed Legislation 2026
High Priority
OC San
State
Bills of Interest
BILL AUTHOR SUMMARY LATEST ACTION OC SAN
POSITION LEGISLATIVE PLAN OTHER
POSITIONS
AB 1621 Wilson [D]AB 1621 aims to streamline and speed up the post-approval (postentitlement) permitting
process for housing projects by setting clearer rules, firm timelines, and limits on agency
reviews. Recent amendments strengthen the bill by capping plan check rounds, shortening
appeal timelines, restricting new or changing requirements, and tying violations of these rules to
the Housing Accountability Act, making it easier to hold local agencies accountable for delays or
noncompliance.
Referred to Senate Housing
Committee
Oppose
Unless
Amended
Legislative and Regulatory Policies: Housing &
Local Agency Authority – Monitor and assess
legislation that affects housing development
processes and ensure local agency discretion is
preserved in infrastructure planning and project
implementation.
ACC‑OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 1710 Carrilo [D]AB 1710 redefines the criteria for "ordinances, policies, and standards" within housing
development, adding materials, requirements, and standards imposed by other public agencies.
It mandates compliance with existing plans and standards at the time of a preliminary
application. The bill aligns with the Permit Streamlining Act, requiring projects considered for
housing developments or emergency shelters to meet consistency and compliance evaluations.
This bill enforces a state-mandated local program impacting all cities, including charter cities,
and affects provisions for mandated cost reimbursements to local agencies.
Referred to Senate Housing
Committee and Senate Local
Government Committee
Watch Legislative and Regulatory Policies: Special
Districts – Oppose further state regulations that
adversely impact special district financing, operations,
and administration.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Not Favor
Unless Amended
AB 1729 Lee [D]AB 1729 revises existing telecommuting provisions by introducing the term "telework" and
mandates the Department of General Services to create a dashboard documenting the benefits
and savings of state telework programs. Each state agency must evaluate its telework program
every 10 years to ensure alignment with operational needs and workforce goals. This bill is
labeled an urgency statute for immediate effect and only impacts state agencies.
Referred to Senate Labor, Public
Employment, and Retirement
Committee and Senate
Government Organization
Committee
Watch Legislative and Regulatory Policies: Special
Districts – Oppose further state regulations that
adversely impact special district financing, operations,
and administration.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 1772 Papan [D]AB 1772 aims to address and prevent the proliferation of aquatic invasive species, specifically
the golden mussel, within California's water systems. This legislation intends to help safeguard
the state's biodiversity and maintain ecological balance by implementing measures to monitor,
report, and control the spread of these species in waterbodies and infrastructure systems.
Referred to Senate Natural
Resources and Water Committee
Watch Legislative and Regulatory Policies: Water Quality
& Ecosystem Protection – Support measures that
control invasive species and protect California water
systems.
ACC-OC - NYC
LOCC - NYC
CASA - Support
CSDA - NYC
ACWA - SIA
AB 1777 Garcia [D]AB 1777 would amend the Health and Safety Code to explicitly authorize the California Air
Resources Board (CARB) to adopt regulations to reduce or mitigate emissions from indirect
sources of air pollution, such as facilities, land uses, and activities that attract mobile emission
sources like trucks, trains, and other vehicles. The bill clarifies that CARB can take this action
when necessary to achieve ambient air quality standards required under federal law, expanding
the agency’s authority beyond current direct vehicle emissions regulation. It aims to fill gaps
where regional indirect source rules have been adopted locally but no consistent statewide
mechanism exists to reduce pollution from high‑traffic indirect sources.
On the Assembly Floor. Watch Legislative and Regulatory Policies: Air Quality &
Environmental Protection – Support measures that
strengthen air quality protections while minimizing
undue regulatory or operational impact on local
agencies.
ACC‑OC - NYC
LOCC - Watch
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 1821 Pacheco [D]AB 1821 allows agencies to charge fees for time spent searching for public records beyond
certain thresholds and updates response timelines to business days. Recent amendments refine
the fee structure, clarify exemptions, and adjust response and extension periods.
Referred to Senate Judiciary
Committee
Watch Legislative and Regulatory Policies: Public
Transparency and Governance – Support policies
that promote transparency and accountability in public
agency operations while ensuring administrative
requirements remain reasonable for local agencies.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 1838 Berman [D]AB 1838 requires contractors bidding on public works projects to disclose any past wage-and-
hour violations and demonstrate corrective actions. Recent amendments clarify disclosure
requirements, documentation standards, and allow disqualification for noncompliance.
Referred to Senate Local
Government and Labor, Public
Employment, and Retirement
Committee
Watch Legislative and Regulatory Policies: Public
Contracting Transparency – Support policies that
enhance transparency and accountability in public
contracting while ensuring competitive and equitable
procurement processes.
ACC‑OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 1898 Schultz [D]This legislation mandates that employers must inform employees about the use of AI tools in
decisions affecting employment and worker surveillance activities.Notifications must specify the
impacted employment decisions,and employers are required to maintain an updated list of AI
tools used,which should be provided annually to employees.Enforcement includes penalties for
non-compliance,reviewable through the Labor Commissioner or via civil action by affected
workers.
Dead Watch Guiding Priorities: Oppose redundant regulatory and
legislative requirements that impose excessive
limitations on effective operations.
ACC‑OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
OC San
State
Bills of Interest
BILL AUTHOR SUMMARY LATEST ACTION OC SAN
POSITION LEGISLATIVE PLAN OTHER
POSITIONS
AB 1997 Lee [D]AB 1997 requires a lead agency to approve or disapprove a housing development project where
90% of the units are affordable to very low or extremely low income households within 30 days of
certifying an environmental impact report (EIR), and establishes a working group to make
recommendations on the most effective ways to expedite the development of housing.
Referred to Senate Local
Government and Housing
Committee
Watch Legislative and Regulatory Policies: Local Agency
Authority & Infrastructure – Support policies that
affirm local control and clarity in agency operations
affecting infrastructure development and system
management.
ACC‑OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Watch
AB 2013 Bennett [D]AB 2013 requires specified community water systems located in high or very high fire risk areas
to provide an annex to their disaster preparedness plans that includes specified information
relating to system preparedness and resiliency during a wildfire.
Dead Watch Legislative and Regulatory Policies: Disaster
Preparedness – Support legislation that improves
emergency preparedness and infrastructure resilience
to protect critical water and wastewater services
during disasters.
ACC-OC - NYC
LOCC - NYC
CASA - Support
CSDA - NYC
ACWA - OUA
AB 2026 Aguiar-Curry [D]AB 2026 expands and streamlines the process for diverting flood flows for groundwater recharge
by broadening eligibility, expediting permitting, and exempting certain projects from CEQA.
Recent amendments further expand the definition of flood flows, remove prior sunset limits, allow
private entities to participate with groundwater agencies, and establish clearer permitting
timelines and criteria.
Referred to Senate Natural
Resources and Water Committee
and Senate Environmental Quality
Committee
Watch Legislative and Regulatory Policies: Water Supply
and Resource Management – Support policies that
improve water supply reliability and sustainable
groundwater management across California.
ACC-OC - NYC
LOCC - NYC
CASA - Support
CSDA - NYC
ACWA - Support
AB 2125 Bennett [D]AB 2125 enhances the requirements imposed upon a plaintiff when filing a notice of completion
of the mailing when conducting the specialized service of process provisions utilized in
comprehensive groundwater adjudications.
Referred to Senate Natural
Resources and Water Committee
Watch Legislative and Regulatory Policies: Water
Resources Administration – Support policies that
improve transparency and accountability in water
rights and groundwater basin management.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Watch
AB 2127 Johnson [D]AB 2127 prevents local governments from prohibiting the construction of new accessory dwelling
units (ADUs) in an area solely because the lots are served by private sewage disposal systems.
Referred to Senate Housing
Committee
Watch Legislative and Regulatory Policies: Regulatory
Reporting & Transparency – Oppose proposals that
create redundant reporting requirements that do not
yield commensurate public benefit and impose
unnecessary administrative burden on local agencies.
ACC‑OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 2180 Ward [D]AB 2180 updates the Proposition 218 Omnibus Implementation Act by clarifying that local
agencies can use any reasonable method to show that property-related fees reflect the cost of
service, rather than needing exact calculations for each parcel. It also confirms that water and
sewer agencies can use uniform or tiered rates based on customer characteristics, and gives
agencies flexibility to allocate costs within those tiers using reasonable approaches, as long as
rates do not exceed the cost of providing service.
On Senate Floor Support Legislative and Regulatory Policies: Local Agency
Authority – Support policies that protect local
agencies’ ability to set rates and fees necessary to
provide essential wastewater and water services.
ACC-OC - NYC
LOCC - Support
CASA - NYC
CSDA - NYC
ACWA -
Support/Sponsor
AB 2381 Johnson [D]AB 2381, introduced by Assembly Member Natasha Johnson, aims to amend the Local Agency
Public Construction Act to increase the threshold for contracts awarded by municipal water
districts and sanitation districts to the lowest responsible bidder from $35,000 to $220,000. The
bill mandates the Controller to adjust this amount annually to reflect the percentage change in
the Engineering News-Record Construction Cost Index and publish the adjusted amount on its
internet website.
Dead Support Legislative and Regulatory Policies: Public
Contracting – Procurement & Fair Practices –
Support fair and effective public contracting standards
that enhance local agency competitiveness while
preserving transparency and accountability.
ACC‑OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
AB 2447 Bauer-Kahan [D]AB 2447 creates the Nitrogen Pollution Reduction Act. Requires the State Water Resources
Control Board (State Water Board) to require the Regional Water Quality Control Boards
(Regional Water Boards) to update the Irrigated Lands Regulatory Program (ILRP) in order to
reduce nitrogen waste discharges from commercial irrigated agricultural lands so that by
January 1, 2030, those lands do not cause or contribute to exceedances of the maximum
contaminant level (MCL) for nitrate, or exceedances of a water quality objective or total
maximum daily load (TMDL) for nitrate.
Dead Watch Legislative and Regulatory Policies: Water Quality
& Ecosystem Protection – Support policies
promoting nutrient management, water quality, and
sustainable agriculture.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Oppose
AB 2568 Johnson [D]AB 2568 reduces the maximum number of days water district board members may be
compensated each month, from 20 days to 15 days. Recent amendments clarify this limit by
revising prior proposed changes to board compensation caps.
Referred to Senate Local
Government Committee
Watch Legislative and Regulatory Policies: Governance
& Compensation – Support policies aligning
compensation with board responsibilities.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Favor
AB 2630 Bennett [D]AB 2630 requires the State Water Resources Control Board to continue adopting water diversion
measurement and reporting regulations as emergency regulations through January 1, 2032.
Recent amendments extend this requirement and maintain CEQA exemptions for those
regulations.
Dead Watch Legislative and Regulatory Policies: Water
Resources Administration – Support policies that
streamline water regulation and protect water supply
reliability.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Oppose
OC San
State
Bills of Interest
BILL AUTHOR SUMMARY LATEST ACTION OC SAN
POSITION LEGISLATIVE PLAN OTHER
POSITIONS
AB 2656 Petrie-Norris [D]AB 2656 requires a public employer shall provide a recognized employee organization no less
than 45 days’ written notice before taking an action to develop, purchase, implement, or utilize
any generative artificial intelligence to perform a service that is within the scope of work of the
job classification represented by the recognized employee organization.
Referred to Senate Labor, Public
Employment, and Retirement
Committee and Senate Privacy,
Digital Technologies, and
Consumer Protection Committee
Watch Guiding Priorities: Oppose redundant regulatory and
legislative requirements that impose excessive
limitations on effective operations.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - Oppose
ACWA - NYC
AB 2777 Environmental
Safety and Toxic
Materials
[Committee]
AB 2777 authorizes the State Water Resources Control Board (State Water Board), when
administering loans under the Clean Water State Revolving Fund (CWSRF), to assess a fee
instead of interest (also known as fee in lieu of interest) for financial assistance services
rendered under the CWSRF, and makes a technical change to recently enacted legislation
dealing with recycled water.
Referred to Senate Environmental
Quality Committee
Support Legislative and Regulatory Policies: Water Quality
& Funding – Support policies promoting
accountability in water quality financing.
ACC-OC - NYC
LOCC - NYC
CASA - Sponsor
CSDA - NYC
ACWA -Favor
SB 342 Umberg [D]SB 342 revises the Contractors State License Law, enabling contractors to claim compensation
for work if properly licensed during contract execution, even if unlicensed at other times. It allows
clients to recover payments made to unlicensed contractors based on the period the contractor
was unlicensed.
At the Assembly Desk waiting
assignment
Watch Legislative and Regulatory Policies: Public
Contracting – Support legislation that protects local
agency contracting integrity.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
SB 899 Grove [D]SB 899 requires the Wildfire and Forest Resilience Task Force to coordinate with health
agencies to evaluate the health impacts of severe wildfire smoke by July 1, 2028, utilizing
existing data. The findings will guide the enhancement of health outcomes in the Wildfire
Resilience Action Plan and allow for independent consultancy contracts as necessary.
Referred to Assembly
Appropriations Committee
Watch Legislative and Regulatory Policies: Disaster
Preparedness – Support policies that improve
wildfire resilience and public health outcomes.
ACC-OC - NYC
LOCC - Support
CASA - NYC
CSDA - NYC
ACWA -
Support/Sponsor
SB 951 Reyes [D]SB 951 establishes the California Worker Technological Displacement Act, requiring employers
to provide advance notice and protections for workers impacted by AI-related job loss. Recent
amendments clarify notice requirements, expand worker protections during the notice period,
and refine enforcement and penalty provisions.
Referred to Assembly Privacy and
Consumer Protection Committee
Watch Legislative and Regulatory Policies: Labor
Relations – Support policies ensuring worker
notification and protections.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
SB 992 Niello [R]SB 992 addresses the auditing process for special districts, removing the January 1, 2027,
repeal date for certain auditing exceptions. It increases the financial threshold from $150,000 to
$250,000, allowing districts with annual revenues below this amount to replace an annual audit
with a financial review, agreed-upon procedures, or a financial compilation.
Referred to Assembly Local
Government Committee
Watch Legislative and Regulatory Policies: Governance
& Finance – Support policies that streamline audits
while maintaining accountability.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
SB 1001 Archuleta [D]SB 1001 requires the Office of Emergency Services to create a standardized identification card
(PIV-I credential) program for water utility workers to help them access restricted areas during
emergencies. Recent amendments clarify the program’s structure, align it with federal
credentialing standards, allow agencies to request cards for qualified personnel, and ensure
cardholders can enter closed disaster areas unless safety concerns prevent it.
Dead Watch Legislative and Regulatory Policies: Disaster
Preparedness – Support programs that improve
water utility safety during emergencies.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Favor
SB 1036 Grayson [D]SB 1036 modifies the Mitigation Fee Act to require that development impact fees be based on a
project’s net impact. Recent amendments require local agencies to reduce or offset fees when a
project replaces or demolishes an existing use so that fees reflect only the incremental impact
on public facilities.
On Assembly Floor Watch Legislative and Regulatory Policies: Development
& Land Use – Support policies that ensure fair fee
assessment.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
SB 1081 Laird [D]SB 1081 expands an existing exception to mandatory water quality penalties by allowing more
small, financially disadvantaged publicly owned treatment works to fund compliance projects
instead of paying fines. Recent amendments broaden eligibility to include systems serving 3,000
or fewer people and clarify hardship criteria.
Dead Watch Legislative and Regulatory Policies: Water Quality
& Compliance Flexibility – Support policies that
improve regulatory flexibility and compliance
mechanisms for wastewater systems, particularly in
ways that enable small systems to invest in
infrastructure rather than non‑productive penalties.
ACC‑OC - NYC
LOCC - NYC
CASA - Support
CSDA - NYC
ACWA - Favor
SB 1085 Durazo [D]SB 1085 requires cities and counties to identify applicable public water systems earlier in the
housing development process and to request water supply information shortly after an
application is submitted. Recent amendments accelerate timelines by requiring water systems to
provide water supply assessments within 45 days for certain housing projects, remove the need
for public meeting approval, and allow cities or counties to take legal action if assessments are
not provided on time.
Referred to Assembly Water
Parks and Wildlife Committee
Watch Legislative and Regulatory Policies: Water Supply
& Project Planning – Support policies that improve
water system planning and assessments.
ACC-OC - NYC
LOCC - Track
CASA - NYC
CSDA - NYC
ACWA - Favor
OC San
State
Bills of Interest
BILL AUTHOR SUMMARY LATEST ACTION OC SAN
POSITION LEGISLATIVE PLAN OTHER
POSITIONS
SB 1117 Cervantes [D]SB 1117 focuses on accessory dwelling units (ADUs) and junior accessory dwelling units,
refining the calculation of impact fees. It mandates that fees for ADUs over 750 square feet be
based solely on the area exceeding this threshold, altering local agencies' responsibilities and
overriding municipal affairs to ensure statewide applicability. The bill stipulates no state
reimbursement for local costs incurred due to these changes.
Referred to Assembly Local
Government Committee
Oppose
Unless
Amended
Legislative and Regulatory Policies: Housing –
Support policies that improve equity in ADU fee
structures.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - NYC
SB 1125 Menjivar [D]SB 1125 mandates the State Water Resources Control Board to devise an annual needs
assessment for drinking water by May 1, 2027, and every year afterwards. This includes
evaluating the funds required to maintain affordable water services for community systems with
fewer than 3,000 connections, updating this analysis every three years.
Referred to Assembly
Environmental Safety and Toxic
Materials Committee
Watch Legislative and Regulatory Policies: Water Supply
– Support policies ensuring safe, reliable drinking
water.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Support
SB 1139 Laird [D]SB 1139 gives the Monterey Peninsula Water Management District authority to enforce an
existing prohibition against the use of potable water for the irrigation of nonfunctional turf located
on commercial, industrial, and institutional properties, and on properties of homeowners’
associations, common interest developments, and community service organizations establishes
the Water Rate Assistance Program, administered by the State Water Resources Control Board
(State Water Board), to provide rate assistance for drinking water services to low-income
residential ratepayers.
Referred to Assembly Water
Parks and Wildlife Committee
Watch Legislative and Regulatory Policies: Water
Conservation – Support policies enforcing potable
water conservation.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Favor
SB 1159 Cabaldon [D]SB 1159 specifies that nonhuman entities, including AI and robots, are excluded from definitions
in key legislative acts concerning public access and participation, such as the California Public
Records Act and the Political Reform Act. The goal of this legislation is to preserve human-
centric interactions in California’s democratic institutions and not overwhelm public agencies by
protecting public resources from being consumed by machine-generated requests.
Referred to Assembly Privacy and
Consumer Protection Committee
Watch Legislative and Regulatory Policies: Special
Districts - Oppose further state regulations that
adversely impact special district financing, operations,
and
administration
ACC-OC - NYC
LOCC - Support
CASA - NYC
CSDA - NYC
ACWA - NYC
SB 1153 Caballero [D]SB 1153 requires urban retail water suppliers in high fire risk areas to update their disaster
preparedness plans to include specific wildfire response and mitigation strategies. Recent
amendments clarify that these requirements are focused on planning (not guaranteeing water
service during fires) and provide liability protections by stating that water systems are not
responsible for wildfire damages due to loss of pressure or supply, and are not required to
function as firefighting systems.
Referred to Assembly Emergency
Management Committee
Watch Legislative and Regulatory Policies: Disaster
Preparedness – Support policies enhancing water
supplier wildfire response.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA -
Support/Sponsor
SB 1313 McNerney [D]SB 1313 expands funding opportunities for projects that address PFAS contamination in drinking
water by allowing grants and loans through existing state and federal funding sources. Recent
amendments refine the measure to focus funding specifically on public water systems, clarify
eligible activities (like treatment, testing, and planning), and allow implementation through a
policy handbook rather than formal rulemaking, streamlining how the program is carried out.
Dead Watch Legislative and Regulatory Policies: Water Quality
& Contaminants – Support policies addressing
PFAS in drinking water.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA - Support
SB 1417 Pérez [D]SB 1417 prohibits mutual water companies from charging tenants for water service and requires
charges to be directed to shareholders, while establishing notice and public meeting
requirements before certain assessments or rate increases. Recent amendments also require
disaster-impacted public water systems to complete a disaster impact assessment within six
months of an emergency, including evaluating system damage, water supply reliability,
affordability impacts, and whether consolidation with another system may be necessary, as a
condition of receiving state funding.
Referred to Assembly Utilities and
Energy Committee
Watch Legislative and Regulatory Policies: Disaster
Preparedness – Support policies improving post-
disaster water system assessment and recovery.
ACC-OC - NYC
LOCC - NYC
CASA - NYC
CSDA - NYC
ACWA -Favor
Legend:ACC-OC - Association of California Cities, Orange County
LOCC - League of California Cities
NYC - Not Yet Considered
CASA - California Association of Sanitation Agencies
ACWA - Association of California Water Agencies
CSDA - California Special Districts Association
1 | P age
TO: Orange County Sanitation District
FROM: Whittingham Public Affairs Advisors
DATE: June 19, 2026
SUBJECT: Local Legislative Report
Following are a few of the more notable developments and issues that have transpired in
Orange County over the last several weeks:
• The Garden Grove manufacturing facility of GKN Aerospace, a global aerospace
company that serves more than 90 percent of the world’s aircraft and engine
manufacturers, remains a focus of local news coverage.
Officials from local, regional, state, and federal agencies continue to review
facility records and operating procedures. In addition, U.S. Department of Justice
agents visited the site to collect documents and records.
The Garden Grove City Council recently held a special meeting where a GKN
representative provided an update on the situation. The representative highlighted
the company’s $3 million donation to the Orange County United Way, which
supported more than 50,000 residents from Stanton, Garden Grove, and
neighboring communities who were evacuated over Memorial Day weekend.
GKN also reaffirmed its commitment to hosting a town hall meeting once
additional information becomes available.
The United Way relief fund remained open for approximately two weeks before
closing after all available funds were distributed.
• The Orange County Board of Supervisors approved a $10.8 billion budget for fiscal
year 2026–27. The budget is approximately $300 million lower than the current
year’s budget and includes a $75 million shortfall that will be covered with one-
time funds.
County officials cited inflation and several legal settlements—including a major
settlement related to the Airport Fire—as key factors contributing to the budget
gap. To date, the County has avoided layoffs by implementing a hiring freeze and
eliminating more than 400 vacant positions.
2 | P age
• The Board of Supervisors also appointed County Chief Information Officer KC
Roestenberg to serve as Interim Chief Executive Officer, succeeding Michelle
Aguirre. Ms. Aguirre had announced her plans to retire at the end of her current
contract, which concludes June 30, after a 35-year career at the County.
• Amid growing public concern over the use of herbicides in local waterways, the
Orange County Board of Supervisors voted to permanently stop using herbicides to
control vegetation in San Juan and Trabuco Creeks.
Fifth District Supervisor Katrina Foley had proposed extending the ban to all
waterways maintained by County Public Works. However, a majority of the Board
chose to focus first on the two creeks while gathering additional information about
potential impacts in other areas.
Much of the discussion centered on glyphosate, a common ingredient in many
herbicides and pesticides. While glyphosate is widely used for weed control, it has
faced ongoing scrutiny over potential health risks, including cancer. Several Orange
County cities have already banned glyphosate and similar chemicals, although a
watchdog group has raised concerns about enforcement and alleged continued use
despite those bans.
• The 2026 Orange County Grand Jury took aim at the Board of Supervisors,
highlighting how each Supervisor receives $2.5 million annually to both manage
staffs of up to a dozen people and provide discretionary funding to organizations
and projects in their respective districts. One of the six findings in their new report,
entitled “Growing Political Appointees and Discretionary Spending within the OC
Board of Supervisors,” detailed a “…widening distance between Supervisors and
the Executive Team (which) undermines the value of the County Executive Team
and complicates coordination, slows policy implementation, and contributes to
fragmented decision-making.” Recommendations include limiting or eliminating
the discretionary fund practice, establishing criteria for Supervisorial staff
members, and realigning the Board’s engagement with the County Executive Team
and department heads on policy matters to enhance collaboration.
• The Grand Jury also released a report entitled, “PFAS (per- and polyfluoroalkyl
substances) and Public Awareness: A Closer Look at Orange County’s Drinking
Water,” which seeks to provide a clear and current understanding of the response
by water agencies countywide to PFAS. The Jurors conducted interviews with a
number of elected and appointed officials and reviewed published water quality
reports and other records from all Orange County water retailers and relevant
agencies. The recommendations of the report include enhanced public education
and awareness, and the pursuit of cost recovery from PFAS manufacturers “…to
offset treatment, monitoring, and long-term remediation costs incurred by local
water agencies and ratepayers.”
3 | P age
• Orange County’s coastline experienced record swells for several days in early June,
which contributed to dangerous conditions at beaches, including the tragic passing
of a five-year-old girl in Laguna Beach, who was swept into the ocean along with
her mother and brother, the latter two being rescued by onlookers. King tides led to
flooding in Newport Beach and other coastal areas.
• As results from the June 2 election continue to be updated as signatures are verified
and ballots are reviewed, it is expected that two of the three County Board of
Supervisors seats on the ballot will move on to a runoff election this November.
Second District Supervisor Vicente Sarmiento overwhelmingly defeated three
challengers and will retain his seat for another four years, but in the 4th Supervisorial
District, Buena Park Mayor Connor Traut and Orange County Department of
Education Board member bested two other candidates and will move on to a runoff
in November. In the 5th Supervisorial District, incumbent Katrina Foley received
several hundred more votes than Assemblymember Diane Dixon, but neither was
able to secure more than 50 percent due to a third candidate who received roughly
6 percent of the vote, forcing a runoff for this seat.
• Communities across the country are weighing the potential benefits and challenges
of data centers, prompting several Southern California cities to adopt moratoriums
on new facilities. Concerns raised during these discussions have also extended to
battery energy storage system (BESS) projects, with some opponents linking the
two and citing potential fire risks.
Despite these concerns, the Westminster Reliability Project continues to move
forward. The battery energy storage facility, which received unanimous approval
from the Westminster City Council in 2025, is currently under construction next to
the Southern California Edison Shawnee substation and is expected to begin
operations in October.
As part of our scope of work, Whittingham Public Affairs Advisors has continued to
monitor the various City Council agendas and highlighted issues and items of relevance to
OC San. We also continue to monitor activities at the South Coast Air Quality Management
District, Orange County Water District, and South Orange County Wastewater Authority.
It is a pleasure to work with you and to represent the Orange County Sanitation District.
Sincerely,
Peter Whittingham
6/30/2026
1
OC San
Administration Committee
Local Legislative Report
Presented By: Peter Whittingham
Whittingham Public Affairs Advisors
July 8, 2026
Agenda
Public Agency Personnel Changes
Emerging News & Issues
2026 Regional Issues Forecast
Update
2
1
2
6/30/2026
2
Public Agency Personnel
Changes In Orange County
•Orange County CEO
•Placentia City Manager
•Irvine City Manager
•Anaheim City Manager
•Moulton Niguel Water
District General Manager
•Mesa Water
3
Emerging News & Issues
•GKN Aerospace
•County Landfills
•Herbicides
•Budget Challenges
Countywide
•OC Grand Jury Reports
•CalOptima
•Budgets & Tax Measures
4
3
4
6/30/2026
3
Updated 2025 Regional Issues Forecast
•Elections
•South Orange County
Wastewater Authority
•South Coast Air Quality
Management District
Rulemaking
•OC Local Agency
Formation Commission
5
Whittingham Public Affairs Advisors
6
Peter Whittingham
CEO
peter@whittinghampaa.com
5
6
ADMINISTRATION COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5020 Agenda Date:7/22/2026 Agenda Item No:15.
FROM:Robert Thompson, General Manager
Originator: Wally Ritchie, Director of Finance
SUBJECT:
WASTEWATER REFUNDING REVENUE OBLIGATIONS, SERIES 2026A
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Authorize the General Manager to issue fixed rate Certificates of Participation,to be referred to as
Wastewater Refunding Revenue Obligations,in an amount sufficient to refund up to $50,700,000 of
Wastewater Refunding Revenue Obligations, Series 2017A.
BACKGROUND
A portion of Orange County Sanitation District’s (OC San)debt portfolio will soon be subject to
optional redemption.As interest rates are lower than the coupons on the outstanding debt,there is a
potential opportunity to refinance the outstanding debt to reduce interest costs for OC San.The
Wastewater Refunding Revenue Obligations Series 2017A (2017 Revenue Obligations)are subject
to optional redemption on February 1,2027.Under current market conditions,a refunding of
$50,700,000 of the outstanding 2017 Revenue Obligations would generate more than 3%net present
value savings (the minimum percentage required by OC San’s debt policy).
RELEVANT STANDARDS
·Comply with OC San Debt Policy -Financial Management and Procedure 201-3-1;net present
value savings are at least three (3)percent of the par amount of the refunded bonds from
refunding outstanding bonds
PROBLEM
The 2017 Revenue Obligations are currently accruing interest at 5.00%rates,which are higher than
current market yields.The 2017 Revenue Obligations will soon be available for optional redemption
on February 1,2027.Not refunding the 2017 Revenue Obligations on,or before,such date would
result in OC San paying above market rates on the 2017 Revenue Obligations.
Orange County Sanitation District Printed on 7/13/2026Page 1 of 4
powered by Legistar™
File #:2026-5020 Agenda Date:7/22/2026 Agenda Item No:15.
PROPOSED SOLUTION
Assuming current market conditions as of June 18,2026,OC San could refund the 2017 Revenue
Obligations for present value debt service savings,net of all costs,of approximately $2 million (equal
to 4.0%of refunded principal)with a refunding amortization structured with the objective of providing
level annual debt service savings.
TIMING CONCERNS
The Tax Cuts and Jobs Act of 2017 eliminated the ability of issuers to conduct advance refunding
(more than 90 days prior to the optional redemption date)on a tax-exempt basis.Therefore,
November 4,2026,is the earliest practical closing date for a tax-exempt refinancing of the 2017
Revenue Obligations which is 89 days before the February 1,2027,optional redemption date.A
refunding after February 1,2026,would result in OC San continuing to pay interest costs above
current market yields.
RAMIFICATIONS OF NOT TAKING ACTION
Not refunding the 2017 Revenue Obligations would result in OC San continuing to pay above market
interest costs.
PRIOR COMMITTEE/BOARD ACTIONS
September 2025 -Adopted Resolution No.OC SAN 25-16 titled:“A Resolution of the Board of
Directors of the Orange County Sanitation District authorizing the execution and delivery by the
District of an Installment Purchase Agreement,a Trust Agreement,a Purchase Agreement,a
Continuing Disclosure Agreement and an Escrow Agreement in connection with the Orange County
Sanitation District Wastewater Refunding Revenue Obligations,Series 2025A,authorizing the
execution and delivery of such Revenue Obligations evidencing principal in an aggregate amount of
not to exceed $120,000,000,approving a Notice of Intention to Sell,authorizing the distribution of an
Official Notice Inviting Bids and an Official Statement in connection with the offering and sale of such
Revenue Obligations and authorizing the execution of necessary documents and related actions;and
that the Orange County Sanitation District Financing Corporation approve the documents supporting
and authorizing the Revenue Obligations in an aggregate amount not to exceed $120,000,000.”
ADDITIONAL INFORMATION
Outstanding Revenue Obligations
OC San currently has seven series of debt issuances outstanding (including the 2017 Revenue
Obligations) in the par amount of $523,835,000 as shown in the table below:
Orange County Sanitation District Printed on 7/13/2026Page 2 of 4
powered by Legistar™
File #:2026-5020 Agenda Date:7/22/2026 Agenda Item No:15.
Outstanding Par
Amount (1)
Series 2025A Refunding $95,070,000
Series 2024A Refunding $120,685,000
Series 2022A Refunding $81,620,000
Series 2021A Refunding $57,815,000
Series 2017A Refunding(2)$65,815,000
Series 2010C $22,830,000
Series 2010A $80,000,000
Total:$523,835,000
(1)June 30, 2026
(2)2017 Revenue Obligations
Depending on market conditions,staff is proposing to refund in November 2026,up to $50,700,000
of the 2017 Revenue Obligations maturing in years 2028 through 2030 with annual coupon rates of
5.00%,as shown in the table below.The principal payment due maturing on February 1,2027,will
not be included in the refunding and will be paid per the debt schedule.
Series Maturity Principal Amount Coupon
2017A 02/01/2028 $15,830,000 5.00%
2017A 02/01/2029 $16,580,000 5.00%
2017A 02/01/2030 $18,290,000 5.00%
Total:$ 50,700,000
Timeline
If the Board of Directors approves pursuing the refinancing of the 2017 Revenue Obligations,staff
will return to the Administration Committee in September 2026 with financing documents for final
approval to complete the refinancing for the 2017 Revenue Obligations.The refinancing of the 2017
Revenue Obligations is expected to close in November 2026.There is the possibility that interest
rates may change at the time of approval of the financing documents and,based on then market
conditions,staff may recommend a modified refinancing plan.The refunding of the 2017 Revenue
Obligations will be sold on a competitive basis to obtain the lowest financing costs possible.
The following summarizes the remaining major steps to be completed for the debt refinancings:
September 2026:
-Board approval of legal and disclosure documents
-Financing Corporation approval of legal and disclosure documents
-Request and receive ratings from bond rating agencies
Orange County Sanitation District Printed on 7/13/2026Page 3 of 4
powered by Legistar™
File #:2026-5020 Agenda Date:7/22/2026 Agenda Item No:15.
October 2026:
-Marketing and sale through a competitive sale process
November 2026:
-Closing
-Begin debt administration
All costs involved with the refinancing,including costs for Norton Rose Fulbright,Special Counsel
and Disclosure Counsel and Public Financial Management,Municipal Advisor,will be paid from the
proceeds of the new refunding issues.
CEQA
N/A
FINANCIAL CONSIDERATIONS
Executing the refunding can potentially save OC San over $700,000 per year in debt interest
expenses.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
N/A
Orange County Sanitation District Printed on 7/13/2026Page 4 of 4
powered by Legistar™
STEERING COMMITTEE
Agenda Report
Headquarters
18480 Bandilier Circle
Fountain Valley, CA 92708
(714) 593-7433
File #:2026-5023 Agenda Date:7/22/2026 Agenda Item No:16.
FROM:Jon Dumitru, Board Chairman
SUBJECT:
GENERAL MANAGER’S COMPENSATION AND BENEFITS
BOARD CHAIR’S RECOMMENDATION
RECOMMENDATION:
Adopt Resolution No.OC SAN 26-11 titled:“A Resolution of the Board of Directors of the Orange
County Sanitation District approving salary adjustments for the General Manager for Fiscal Year
2026/2027.”The changes consist of a salary increase and corresponding range adjustment of 4.5%,
effective in the first pay period of July 2026.
BACKGROUND
The General Manager of the Orange County Sanitation District (OC San)is employed on an At-Will
basis and serves at the pleasure of the Board of Directors.
According to Section 6 of the General Manager’s At-Will Employment Agreement,the Steering
Committee conducts an annual performance evaluation of the General Manager and reviews his
compensation and benefits.Based on this review,the Steering Committee provides a
recommendation to the Board regarding any proposed adjustments to be effective in July of the year
of the review.
The Steering Committee conducted the General Manager’s annual performance evaluation for Fiscal
Year 2025/2026 in closed session and recommends that the Board approve the proposed salary
increase and corresponding range adjustment of 4.5%.The proposed range adjustment maintains
the General Manager at approximately Step 4.4 within the salary range,allowing for salary
progression.Additionally,the proposed adjustment is intended to maintain a competitive total
compensation package that helps achieve the Board’s targeted market position at the 75th
percentile,maintains appropriate salary differentiation and supports the retention of executive
leadership.
RELEVANT STANDARDS
·Offer competitive compensation and benefits
·Maintain positive employer-employee relations
·Cultivate a highly qualified, well-trained, and diverse workforce
·Comply with OC San policy (Policy 6.1 Appraisal of Performance)and the General Manager’sOrange County Sanitation District Printed on 7/14/2026Page 1 of 4
powered by Legistar™
File #:2026-5023 Agenda Date:7/22/2026 Agenda Item No:16.
·Comply with OC San policy (Policy 6.1 Appraisal of Performance)and the General Manager’s
At-Will Employment Agreement
PROBLEM
Board-approved salary increases for OC San’s Executive Management Team,Manager Group,and
represented employees became effective in July 2026.The General Manager’s salary is currently
13.6%above that of the highest-paid direct report.Without a corresponding adjustment,the salary
differential will continue to narrow,increasing salary compaction and moving the General Manager’s
compensation below the Board’s target market position.
PROPOSED SOLUTION
Approve Resolution No.OC SAN 26-11 adjusting the General Manager proposed salary increase
and corresponding range adjustment for Fiscal Year 2026/2027.The proposed salary adjustment
would help maintain an appropriate level of salary differentiation and avoid salary compaction.
TIMING CONCERNS
The Steering Committee completed the General Manager’s annual performance evaluation in
accordance with his agreement.Timely Board approval of the recommended compensation
adjustment will align the General Manager’s compensation with previously approved salary
adjustments for other employee groups,help maintain appropriate salary differentiation and achieve
retention of key staff.
RAMIFICATIONS OF NOT TAKING ACTION
Delaying action would postpone implementation of any approved adjustment,not maintain the
targeted market position at the 75th percentile,and contribute to salary compaction with direct
reports.
PRIOR COMMITTEE/BOARD ACTIONS
June 2026 -Steering Committee reviewed the General Manager’s performance evaluation in closed
session.
August 2025 -Board of Directors adopted Resolution No.OC SAN 25-14 titled:“A Resolution of the
Board of Directors of the Orange County Sanitation District approving salary and benefit adjustments
for the General Manager for Fiscal Year 2025/2026.”The changes consist of a salary increase and
corresponding salary range adjustment of 4.5%,effective the first pay period of July and changes to
a leave bank, 457(b) contribution and mileage reimbursement.
ADDITIONAL INFORMATION
As a matter of reference,OC San’s accomplishments during the past year,under the direction of the
General Manager, include the following:
·Created a CIP staffing plan to minimize Supplemental Engineering Services,improve
Orange County Sanitation District Printed on 7/14/2026Page 2 of 4
powered by Legistar™
File #:2026-5023 Agenda Date:7/22/2026 Agenda Item No:16.
·Created a CIP staffing plan to minimize Supplemental Engineering Services,improve
succession planning, and streamline project delivery.
·Completed the development,Request for Proposals,and contract award for a customer
service portal to improve stakeholder access and service efficiency.
·Developed a new small-project funding process to increase transparency,efficiency,and
budget control.
·Identified and prioritized opportunities to apply Artificial Intelligence (AI)to optimize
administrative, operational, and treatment processes.
·Conducted a cyber penetration test and red team assessment of process control systems.
·Updated ordinances and policies related to delinquent fees and penalties for discharge
permits.
·Received final technical memos outlining asset database improvements and a risk framework
for major/critical assets.
·Pursued and completed a cost-saving debt refunding transaction,achieving $14 million in
savings.
·Conducted a study to right-size OC San’s transportation fleet and support compliance with
clean air standards.
·Developed updated Fats,Oils,and Grease (FOG)outreach materials for food service
establishments within OC San’s service area.
·Updated the Industrial Waste Survey program using improved information-management tools
to better identify required permittees.
·Transitioned Plant No.1 process and electrical controls from CRISP to the ABB Distributed
Control System under project J-120.
·Conducted assessments of easements with encroachments or access constraints,and
continued surveys.
·Completed successful vendor demonstration of the Supercritical Water Oxidation unit.
·Initiated Phase 1 permitting for biosolids deep well injection and developed the outreach
Scope of Work.
·Developed and conducted a comprehensive high-flow emergency operations exercise
simulating influent emergencies and SARI trunkline rupture scenarios.
·Developed a Physical Security Master Plan addressing risk mitigation,regulatory compliance,
and long-term facility protection.
·Developed a wastewater laboratory and data science training curriculum to support operator
certification.
·Expanded partnerships with vocational training institutions to enhance talent pipelines for hard
-to-fill positions in instrumentation, electrical, and engineering.
CEQA
N/A
FINANCIAL CONSIDERATIONS
The annual cost of the proposed salary changes is approximately $18,117.
The funds for the additional compensation are included in OC San’s operational budget.
Orange County Sanitation District Printed on 7/14/2026Page 3 of 4
powered by Legistar™
File #:2026-5023 Agenda Date:7/22/2026 Agenda Item No:16.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Resolution No. OC SAN 26-11
·General Manager Salary Schedules (Current & Proposed)
·At-Will Employment Agreement, Robert C. Thompson (eff. 7/1/26)
Orange County Sanitation District Printed on 7/14/2026Page 4 of 4
powered by Legistar™
OC SAN 26-11-1
RESOLUTION NO. OC SAN 26-11
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
ORANGE COUNTY SANITATION DISTRICT APPROVING SALARY
ADJUSTMENTS FOR THE GENERAL MANAGER FOR FISCAL
YEAR 2026/2027
WHEREAS, the General Manager provides organizational leadership, strategic
direction, and agency oversight for Orange County Sanitation District (OC San); and
WHEREAS, the General Manager serves in an at-will employment capacity, which
may be terminated at any time by OC San’s Board of Directors with or without cause; and
WHEREAS, it is OC San’s philosophy to compensate employee classifications
competitively, which currently can be achieved through alignment with the salary
market; and
WHEREAS, the General Manager’s At-Will Agreement provides for the OC San
Steering Committee to conduct an annual performance evaluation of the General
Manager and review of his compensation and benefits. The Steering Committee shall
make its recommendation(s) to the Board concerning adjustment to the compensation
and/or benefits paid or provided to the General Manager. After consideration of the
recommendation(s) of the Steering Committee, the Board shall determine and approve
the compensation, including benefits, payable to General Manager, which generally
becomes effective July of the year of the review; and
WHEREAS, the Steering Committee commenced its review of the General
Manager’s performance in June 2026, finalized its review and made its recommendation
to the Board on July 22, 2026.
NOW, THEREFORE, the Board of Directors of the Orange County Sanitation
District, DOES HEREBY RESOLVE, DETERMINE, AND ORDER:
1. That the At-Will Agreement with the General Manager (Attached hereto as
Exhibit 1) setting forth the terms and conditions of his employment, including
changes consisting of a 4.5% salary increase and corresponding salary range
adjustment as determined by the Board of Directors, is hereby approved to be
effective retroactively to the first pay period of July 2026;
2. That the Board Chair, or his designee, is authorized to implement the changes to
salary and benefit items approved herein.
OC SAN 26-11-2
PASSED AND ADOPTED at a regular meeting of the Board of Directors held July
22, 2026.
________________________________
Christine Marick
Board Vice Chairwoman
ATTEST:
_______________________________
Kelly A. Lore, MMC
Clerk of the Board
OC SAN 26-11-3
STATE OF CALIFORNIA )
) ss
COUNTY OF ORANGE )
I, Kelly A. Lore, Clerk of the Board of Directors of the Orange County Sanitation
District, do hereby certify that the foregoing Resolution No. OC SAN 26-11 was passed
and adopted at a regular meeting of said Board on the 22nd of July 2026, by the following
vote, to wit:
AYES:
NOES: ABSTENTIONS: ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal
of Orange County Sanitation District this 22nd of July 2026.
Kelly A. Lore, MMC
Clerk of the Board of Directors
Orange County Sanitation District
General Manager Salary Schedules
Orange County Sanitation District
Classification and Compensation Plan
Pay Grade Step 1 Step 2 Step 3 Step 4 Step 5
EM37 Annual 340,018$ 357,427$ 375,710$ 394,930$ 415,085$
Monthly 28,335$ 29,786$ 31,309$ 32,911$ 33,101$
Hourly 163.47$ 171.84$ 180.63$ 189.87$ 199.56$
Pay Grade Step 1 Step 2 Step 3 Step 4 Step 5
EM37 Annual 355,326$ 373,506$ 392,621$ 412,693$ 433,763$
Monthly 29,611$ 31,125$ 32,718$ 34,391$ 36,147$
Hourly 170.83$ 179.57$ 188.76$ 198.41$ 208.54$
GENERAL MANAGER, FY 2025-26 (Current)
GENERAL MANAGER, FY 2026-27 (Proposed)
1
AT-WILL EMPLOYMENT AGREEMENT
Robert C. Thompson
General Manager
ORANGE COUNTY SANITATION DISTRICT
THIS AT-WILL EMPLOYMENT AGREEMENT ("Agreement") is entered into, to be
effective the 1st day of July, 2026, by and between:
ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to as "OC San";
AND ROBERT C. THOMPSON, sometimes hereinafter referred to as "General
Manager" or “Mr. Thompson”; collectively referred to herein as “the Parties”
RECITALS
WHEREAS, OC San desires to continue to employ Robert C. Thompson, as General
Manager of OC San, pursuant to the terms and conditions as set forth in this Agreement; and
WHEREAS, Mr. Thompson, by virtue of his education, training and experience, is fully
qualified to fill the position of General Manager and desires to serve OC San as its General
Manager, pursuant to the terms and conditions of this Agreement; and
WHEREAS, per Resolution No. OC SAN 26-__ adopted on July [ ], 2026, OC San’s Board
of Directors has approved and authorized the Board Chair to execute this Agreement to include a
base-building salary increase of 4.5% of Mr. Thompson’s current salary.
2
WHEREAS, at the beginning of negotiations of a new Agreement, the parties agreed that
any salary changes agreed to would take effect retroactively to the first pay period of July 2026,
which is the first pay period in the current fiscal year.
NOW, THEREFORE, the Parties hereto agree as follows:
Section 1: OC San hereby continues to employ Mr. Thompson to serve as General
Manager of the Orange County Sanitation District, continuing on the effective date hereof, and
continuing until termination by either Party, as provided in this Agreement.
In that capacity, Mr. Thompson agrees to perform the functions and duties of General
Manager, the administrative head of OC San, as prescribed by the laws of the State of California,
and by the rules, regulations, decisions, and directions of the Board of Directors of OC San
(hereinafter referred to as "Board"). The General Manager's duties may involve expenditures of
time in excess of the regularly established workday or in excess of a forty-hour work week and
may also include time outside normal office hours (including attendance at Board and Committee
meetings). General Manager is classified as an exempt employee under applicable California and
federal wage and hour laws and shall not be entitled to any additional compensation for hours
worked in excess of forty in a work week.
Section 2: Mr. Thompson shall be employed in an "at-will" capacity serving at the sole
pleasure of the Board. This means that either party to this Agreement may terminate the Agreement
at any time for any reason with or without cause, and without hearing, upon 30 days' notice to the
other party. Mr. Thompson is advised and acknowledges that he has none of the termination rights
of a regular employee of OC San. Except as expressly provided herein, and as a condition of
employment, Mr. Thompson knowingly, willingly and voluntarily gives up, waives, and disclaims any
and all rights he may have, express or implied, to any notice and/or hearing before or after
termination, and/or to any continued employment with OC San after termination.
As an "at-will" employee, Mr. Thompson understands that he may be subject to termination
with or without cause at the sole discretion of the Board, notwithstanding that the other provisions
of OC San’s Personnel Policies and Procedures Manual (hereinafter referred to as "Manual") apply
to Mr. Thompson. If OC San terminates employment without cause, Mr. Thompson shall be given a
thirty (30) day Notice of Termination, and severance pay in an amount equal to six (6) months of his
then current annual base salary upon Mr. Thompson’s execution of a valid written release of legal
claims and expiration of any legally required revocation period.
3
If OC San terminates this Agreement (thereby terminating Mr. Thompson’s employment) without
cause, and Mr. Thompson executes a valid written release of legal claims, the severance pay is
considered a cash settlement related to the termination of Mr. Thompson and waiver of legal claims and
shall be fully reimbursed to OC San by Mr. Thompson if Mr. Thompson is convicted of a crime involving
an abuse of his office or position. Abuse of office or position shall have the meaning set forth in
Government Code 53243.4, as may be amended, of either (1) an abuse of public authority, including, but
not limited to, waste, fraud, and violation of the law under color of authority, or (2) a crime against public
justice, including, but, not limited to, a crime described in Title 5 (commencing with Section 67), Title 6
(commencing with Section 85), and Title 7 (commencing with Section 92) of Part 1 of the Penal Code. .
Mr. Thompson shall reimburse such severance pay to OC San no later than six (6) months after such
conviction. If Mr. Thompson terminates his employment with 30 days' notice, the Board shall have the
right to accept his resignation effective the date notice is given. Such decision to accept his resignation
earlier shall not be considered a termination without cause and shall not entitle Mr. Thompson to receive
the severance pay noted above.
Section 3: The term of this Agreement shall commence on the effective date above and
continue for an indefinite duration, until terminated by either Party pursuant to Section 2 above, or
unless terminated or amended as provided herein.
Section 4: As compensation for the services to be performed hereunder, upon the effective date
of this Agreement, OC San agrees to pay General Manager an annual base salary for services rendered
of four hundred twenty thousand six hundred eighty dollars ($420,680.00), subject to all applicable
deductions and withholdings of any and all sums required by then current state, federal or local law,
along with deductions of applicable sums the General Manager is obligated to pay because of
participation in plans and programs described in this Agreement, and paid biweekly in accordance with
OC San’s established accounting and payroll practices at the same time and in the same manner as
other employees of OC San. No increase in salary may exceed the compensation permitted by the
applicable salary range for the classification established by duly adopted Resolution of the Board.
Section 5: For the period of this Agreement, OC San shall provide Mr. Thompson with a
fixed benefit package that includes the following:
• Personal Leave – accrued based on years of service for all paid hours, including
hours actually worked and hours in a paid-leave payroll status, on a biweekly
basis in accordance with the Manual. Personal leave accruals shall not exceed
4
four hundred forty (440) hours as of December 31 of each year. Any hours in
excess of said limit, will be paid to Mr. Thompson in January in an amount
equal to the hourly rate of compensation.
• Administrative Leave – 60 hours per fiscal year, granted and not eligible for
annual cash out.
• Investment Incentive Salary (llS) – 6% of base salary applied on a biweekly fiscal
year basis, and a flat amount of one thousand two hundred fifty dollars ($1,250)
annually.
• Deferred Compensation – OC San-paid annual allocation of $12,000 allocated
on a biweekly calendar year basis.
• Car Allowance – OC San-paid annual allocation of $8,400 issued on a
semimonthly basis.
• Extended Trip Mileage Reimbursement – Mileage reimbursement for
business-related trips in excess of seventy five (75) miles one-way driven in
Thompson’s personal vehicle.
• Medical Allowance – OC San-paid annual allocation of six thousand dollars
($6,000), with any funds not used toward employee portions of insurance
premiums to be returned to the employee in a mutually agreeable manner
(such as flexible spending account contributions or cash payment).
Mr. Thompson’s benefit package also shall include benefits consistent with the Manual
for: holiday pay; medical, dental, vision and life insurance at three times base salary; long-term
and short-term disability insurance; and employee assistance program. Additionally, Mr.
Thompson’s benefit package shall include executive disability insurance benefits, consistent
with those provided to OC San managers.
These benefits shall remain in full force and effect unless and until replaced by an
amendment to this Agreement, signed by Mr. Thompson and approved by the Board, which
amendment shall include the effective date thereof.
Section 6: OC San’s Steering Committee shall meet with General Manager in connection
with the conclusion of each fiscal year of service during the term of this Agreement to review and
evaluate his performance over the prior year. The Steering Committee shall make its
recommendation(s) to the Board concerning adjustment to the compensation and/or benefits paid
or provided to General Manager, to be effective in July of the year of review. After consideration of
the recommendation(s) of the Steering Committee, the Board shall determine and approve the
compensation, including benefits, payable to General Manager, which generally becomes effective
July of the fiscal year of the review. Failure of OC San to review and evaluate the performance of
5
the General Manager pursuant to this section shall not affect the right of OC San to terminate the
General Manager's employment and shall not be considered a breach of this Agreement.
Section 7: Mr. Thompson shall be a Participant Member in the Orange County Employees
Retirement System ("OCERS"). OC San shall pay the required employer's contribution of Mr.
Thompson’s required employee contribution rate for membership in OCERS pension Plan H which
includes full payment of Employer Paid Member Contribution (“EPMC”).
Section 8: OC San shall reimburse General Manager for all expenses paid by him and
incurred for non-personal, job-related OC San business that are reasonably necessary to the General
Manager's service to OC San and are not specifically provided for herein. OC San agrees to either
pay such expenses in advance or to reimburse the expenses, so long as the expenses are incurred
and submitted according to the criteria established by OC San’s budget and/or normal expense
reimbursement procedures pursuant to applicable policy Resolutions. To be eligible for
reimbursement, all expenses must be supported by documentation meeting OC San’s policies and
requirements and must be submitted within time limits established by OC San. Such reimbursement
shall not be considered a benefit.
Section 9: During the period of this Agreement, it is agreed that General Manager shall
devote his full time, skills, labor, and attention to said employment. At no time may General Manager
undertake outside activities consisting of consultant work, speaking engagements, writing, lecturing,
or other similar professional activities for money or other consideration without prior approval of OC
San’s Steering Committee. However, the expenditure of reasonable amount of time for educational,
charitable, or professional activities shall not be deemed a breach of this Agreement if those
activities do not conflict or materially interfere with the services required under this Agreement and
shall not require the prior written consent of the Steering Committee.
This Agreement shall not be interpreted to prohibit General Manager from making passive
personal investments or conducting private business affairs, provided those activities are not
deemed to be a conflict of interest by state law nor do they conflict or materially interfere with the
services required under this Agreement. Nothing in this At-Will Employment Agreement shall be
construed to prevent General Manager from engaging in lawful conduct outside of working hours
that does not materially interfere with General Manager’s employment.
Section 10: The Board has the sole discretion to determine whether OC San shall pay
General Manager pending an investigation into any alleged misconduct by General Manager. In the
event that OC San’s Board determines, in its sole discretion, that it is in the best interest of OC San
for General Manager to be placed on paid administrative leave pending such an investigation,
6
General Manager shall fully reimburse any salary provided for that purpose if the misconduct for
which the General Manager was under investigation results in the General Manager being convicted
of a crime involving an abuse of his office or position as defined in Section 2 of this Agreement.
General Manager shall reimburse such salary to OC San no later than six months after such
conviction.
Section 11: In the event that OC San provides funds for the legal criminal defense of
General Manager, General Manager shall fully reimburse said funds to OC San if the General
Manager is convicted of a crime involving an abuse of his/her office or position as defined in Section
2 of this Agreement. General Manager shall reimburse such criminal legal defense fees to OC San
no later than six months after such conviction.
Section 12: Other employment benefits for General Manager not specifically provided for
in this At-Will Employment Agreement are set out in the Manual.
Section 13: This Agreement supersedes any and all other prior agreements, either oral or
in writing, between the Parties hereto with respect to the employment of Mr. Thompson by OC San
and contains all of the covenants and agreements between the Parties with respect to that
employment in any manner whatsoever. Each Party to this Agreement acknowledges that no
representation, inducement, promise, or agreement, orally or otherwise, has been made by any
Party, or anyone acting on behalf of any Party, which is not embodied herein, and that no other
agreement, statement, or promise not contained in this Agreement or Employment shall be valid or
binding on either Party.
Section 14: Any notices to be given hereunder by either Party to the other shall be in
writing and may be transmitted by personal delivery, or by mail, registered or certified, postage
prepaid, with return receipt requested. Mailed notices shall be addressed to the Parties at the
addresses maintained in the personnel records of OC San, but each Party may change that
address by written notice in accordance with this Section. Notices delivered personally shall be
deemed communicated as of the date of actual receipt; mailed notices shall be deemed
communicated as of the date of mailing.
Section 15: Any modifications of this Agreement will be effective only if set forth in writing
and signed by the Parties.
7
Section 16: The failure of either Party to insist on strict compliance with any of the terms,
covenants, or conditions of this Agreement by the other Party, shall not be deemed a waiver of
that term, covenant, or condition, nor shall any waiver or relinquishment of any right or power at
any one time or times be deemed a waiver or relinquishment of that right or power for all or any
other times.
Section 17: If any term or other provision of this At-Will Employment Agreement is
determined by a court of competent jurisdiction to be invalid, illegal, or incapable of being enforced
by any rule of law or public policy, all other terms, provisions, and conditions shall nevertheless
remain in full force and effect. Upon such determination that any term or other provision is invalid,
illegal, or incapable of being enforced, the Parties hereto shall negotiate in good faith to modify this
Agreement so as to affect the original intent of the Parties as closely as possible to the fullest extent
permitted by applicable law in an acceptable manner to the end that the transactions contemplated
hereby are fulfilled to the extent possible.
Section 18: This Agreement shall be governed by and construed in accordance with the
laws of the State of California and all applicable ordinances, policies, and resolutions.
Section 19: General Manager acknowledges that he has had the opportunity and has
conducted an independent review of the financial and legal effects of this Agreement. General
Manager acknowledges that he has made an independent judgment upon the financial and legal
effects of the Agreement and has not relied upon representation of OC San, its elected or
appointed officers and officials, agents, or employees other than those expressly set forth in this
Agreement. General Manager acknowledges that he has been advised to obtain, and has availed
himself of, legal advice with respect to the terms and provisions of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this At-Will Employment
Agreement as follows.
GENERAL MANAGER
By:___________________________ Robert C. Thompson
8
VICE CHAIR, BOARD OF DIRECTORS
By:_____________________________ Christine Marick
APPROVED AS TO FORM:
___________________________________ Scott C. Smith General Counsel
Date:_______________________________
ORANGE COUNTY SANITATION DISTRICT
COMMON ACRONYMS
ACWA Association of California
Water Agencies LOS Level Of Service RFP Request For Proposal
APWA American Public Works
Association MGD Million Gallons Per Day RWQCB Regional Water Quality
Control Board
AQMD Air Quality Management
District MOU Memorandum of
Understanding SARFPA Santa Ana River Flood
Protection Agency
ASCE American Society of Civil Engineers NACWA National Association of Clean Water Agencies SARI Santa Ana River Interceptor
BOD Biochemical Oxygen Demand NEPA National Environmental Policy
Act SARWQCB Santa Ana Regional Water
Quality Control Board
CARB California Air Resources
Board NGOs Non-Governmental
Organizations SAWPA Santa Ana Watershed
Project Authority
CASA California Association of
Sanitation Agencies NPDES National Pollutant Discharge
Elimination System SCADA Supervisory Control And
Data Acquisition
CCTV Closed Circuit Television NWRI National Water Research
Institute SCAP
Southern California
Alliance of Publicly Owned
CEQA California Environmental
Quality Act O & M Operations & Maintenance SCAQMD South Coast Air Quality
Management District
CIP Capital Improvement
Program OCCOG Orange County Council of
Governments SOCWA South Orange County
Wastewater Authority
CRWQCB California Regional Water
Quality Control Board OCHCA Orange County Health Care
Agency SRF Clean Water State
Revolving Fund
CWA Clean Water Act OCSD Orange County Sanitation District SSMP Sewer System Management Plan
CWEA California Water Environment Association OCWD Orange County Water District SSO Sanitary Sewer Overflow
EIR Environmental Impact Report OOBS Ocean Outfall Booster Station SWRCB State Water Resources
Control Board
EMT Executive Management Team OSHA Occupational Safety and
Health Administration TDS Total Dissolved Solids
EPA US Environmental Protection Agency PCSA
Professional
Consultant/Construction TMDL Total Maximum Daily Load
FOG Fats, Oils, and Grease PDSA Professional Design Services
Agreement TSS Total Suspended Solids
gpd gallons per day PFAS
Per- and Polyfluoroalkyl
Substances WDR Waste Discharge
Requirements
GWRS Groundwater Replenishment
System PFOA Perfluorooctanoic Acid WEF Water Environment
Federation
ICS Incident Command System PFOS Perfluorooctanesulfonic Acid WERF Water Environment & Reuse Foundation
IERP Integrated Emergency
Response Plan POTW Publicly Owned Treatment
Works WIFIA Water Infrastructure
Finance and Innovation Act
JPA Joint Powers Authority ppm parts per million WIIN Water Infrastructure Improvements for the
LAFCO Local Agency Formation
Commission PSA Professional Services
Agreement WRDA Water Resources
Development Act
ORANGE COUNTY SANITATION DISTRICT
GLOSSARY OF TERMS
ACTIVATED SLUDGE PROCESS – A secondary biological wastewater treatment process where bacteria reproduce at a high rate with the introduction of excess air or oxygen and consume dissolved nutrients in the wastewater.
BENTHOS – The community of organisms, such as sea stars, worms, and shrimp, which live on, in, or near the seabed, also known as the benthic zone.
BIOCHEMICAL OXYGEN DEMAND (BOD) – The amount of oxygen used when organic matter undergoes decomposition by microorganisms. Testing for BOD is done to assess the amount of organic matter in water.
BIOGAS – A gas that is produced by the action of anaerobic bacteria on organic waste matter in a digester tank that can be used
as a fuel.
BIOSOLIDS – Biosolids are nutrient rich organic and highly treated solid materials produced by the wastewater treatment process. This high-quality product can be recycled as a soil amendment on farmland or further processed as an earth-like product for
commercial and home gardens to improve and maintain fertile soil and stimulate plant growth.
CAPITAL IMPROVEMENT PROGRAM (CIP) – Projects for repair, rehabilitation, and replacement of assets. Also includes treatment improvements, additional capacity, and projects for the support facilities.
COLIFORM BACTERIA – A group of bacteria found in the intestines of humans and other animals, but also occasionally found elsewhere, used as indicators of sewage pollution. E. coli are the most common bacteria in wastewater.
COLLECTIONS SYSTEM – In wastewater, it is the system of typically underground pipes that receive and convey sanitary wastewater or storm water.
CERTIFICATE OF PARTICIPATION (COP) – A type of financing where an investor purchases a share of the lease revenues of a program rather than the bond being secured by those revenues.
CONTAMINANTS OF POTENTIAL CONCERN (CPC) – Pharmaceuticals, hormones, and other organic wastewater contaminants.
DILUTION TO THRESHOLD (D/T) – The dilution at which the majority of people detect the odor becomes the D/T for that air sample.
GREENHOUSE GASES (GHG) – In the order of relative abundance water vapor, carbon dioxide, methane, nitrous oxide, and ozone gases that are considered the cause of global warming (“greenhouse effect”).
GROUNDWATER REPLENISHMENT SYSTEM (GWRS) – A joint water reclamation project that proactively responds to Southern California’s current and future water needs. This joint project between the Orange County Water District and OCSD provides 70
million gallons per day of drinking quality water to replenish the local groundwater supply.
LEVEL OF SERVICE (LOS) – Goals to support environmental and public expectations for performance.
N-NITROSODIMETHYLAMINE (NDMA) – A N-nitrosamine suspected cancer-causing agent. It has been found in the GWRS
process and is eliminated using hydrogen peroxide with extra ultra-violet treatment.
NATIONAL BIOSOLIDS PARTNERSHIP (NBP) – An alliance of the NACWA and WEF, with advisory support from the EPA. NBP is committed to developing and advancing environmentally sound and sustainable biosolids management practices that go beyond regulatory compliance and promote public participation to enhance the credibility of local agency biosolids programs and improved communications that lead to public acceptance.
PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) – A large group (over 6,000) of human-made compounds that are resistant to heat, water, and oil and used for a variety of applications including firefighting foam, stain and water-resistant clothing, cosmetics, and food packaging. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA) have been the focus of increasing regulatory scrutiny in drinking water and may result in adverse health effects including developmental effects to fetuses during pregnancy, cancer, liver damage, immunosuppression, thyroid effects, and other effects.
PERFLUOROOCTANOIC ACID (PFOA) – An ingredient for several industrial applications including carpeting, upholstery, apparel, floor wax, textiles, sealants, food packaging, and cookware (Teflon).
PERFLUOROOCTANESULFONIC ACID (PFOS) – A key ingredient in Scotchgard, a fabric protector made by 3M, and used in numerous stain repellents.
PLUME – A visible or measurable concentration of discharge from a stationary source or fixed facility.
PUBLICLY OWNED TREATMENT WORKS (POTW) – A municipal wastewater treatment plant.
SANTA ANA RIVER INTERCEPTOR (SARI) LINE – A regional brine line designed to convey 30 million gallons per day of non-reclaimable wastewater from the upper Santa Ana River basin to the ocean for disposal, after treatment.
SANITARY SEWER – Separate sewer systems specifically for the carrying of domestic and industrial wastewater.
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) – Regional regulatory agency that develops plans and
regulations designed to achieve public health standards by reducing emissions from business and industry.
SECONDARY TREATMENT – Biological wastewater treatment, particularly the activated sludge process, where bacteria and other microorganisms consume dissolved nutrients in wastewater.
SLUDGE – Untreated solid material created by the treatment of wastewater.
TOTAL SUSPENDED SOLIDS (TSS) – The amount of solids floating and in suspension in wastewater.
ORANGE COUNTY SANITATION DISTRICT
GLOSSARY OF TERMS
TRICKLING FILTER – A biological secondary treatment process in which bacteria and other microorganisms, growing as slime on the surface of rocks or plastic media, consume nutrients in wastewater as it trickles over them.
URBAN RUNOFF – Water from city streets and domestic properties that carry pollutants into the storm drains, rivers, lakes, and oceans.
WASTEWATER – Any water that enters the sanitary sewer.
WATERSHED – A land area from which water drains to a particular water body. OCSD’s service area is in the Santa Ana River Watershed.