Loading...
HomeMy WebLinkAbout04-22-2026 Board of Directors Complete Agenda PacketNOTICE OF REGULAR MEETING AGENDA PUBLIC PARTICIPATION NOTICE ORANGE COUNTY SANITATION DISTRICT BOARD OF DIRECTORS APRIL 22, 2026 - 6:00 PM ACCESSIBILITY FOR THE GENERAL PUBLIC Your participation is always welcome. OC San offers several ways in which to interact during this meeting. MEETING PARTICIPATION INSTRUCTIONS www.ocsan.gov IN-PERSON MEETING ATTENDANCE OC San Headquarters: 18480 Bandilier Circle, Fountain Valley, CA 92708 ONLINE MEETING PARTICIPATION Join the meeting now PARTICIPATE BY TELEPHONE Dial: (213) 279-1455 Phone Conference ID: 274 334 871# WATCH THE MEETING ONLINE https://ocsd.legistar.com/Calendar.aspx Details on how to participate can be found on our website at Join the live meeting on Teams: The meeting will be available for online viewing at: For any questions and/or concerns, please contact the Clerk of the Board’s office at 714-593-7433. Thank you for your interest in OC San! SUBMIT A COMMENT Online at: https://ocsd.legistar.com/Calendar.aspx or by emailing: OCSanClerk@ocsan.gov BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, April 22, 2026 - 6:00 PM Board Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 ACCOMMODATIONS FOR THE DISABLED: If you require any special disability related accommodations, please contact the Orange County Sanitation District (OC San) Clerk of the Board’s office at (714) 593-7433 at least 72 hours prior to the scheduled meeting. Requests must specify the nature of the disability and the type of accommodation requested. AGENDA DESCRIPTION: The agenda provides a brief general description of each item of business to be considered or discussed. The recommended action does not indicate what action will be taken. The Board of Directors may take any action which is deemed appropriate. MEETING RECORDING: A recording of this meeting is available within 24 hours after adjournment of the meeting at https://ocsd.legistar.com/Calendar.aspx or by contacting the Clerk of the Board. SUBMIT A COMMENT: You may submit your comments and questions in writing in advance of, or during the meeting by using the eComment feature available online at: https://ocsd.legistar.com/Calendar.aspx or by sending them to OCSanClerk@ocsan.gov with the subject line "PUBLIC COMMENT ITEM # [insert relevant item number]" or "PUBLIC COMMENT NON-AGENDA ITEM". All written public comments will be provided to the legislative body and may be read into the record or compiled as part of the record. NOTICE TO DIRECTORS: To place items on the agenda for a Committee or Board Meeting, the item must be submitted to the Clerk of the Board: Kelly A. Lore, MMC, (714) 593-7433 / klore@ocsan.gov at least 14 days before the meeting. For any questions on the agenda, Board members may contact staff at: General Manager: Rob Thompson, rthompson@ocsan.gov / (714) 593 7110 Asst. General Manager: Lorenzo Tyner, ltyner@ocsan.gov / (714) 593 7550 Director of Communications: Jennifer Cabral, jcabral@ocsan.gov / (714) 593 7581 Director of Engineering: Mike Dorman, mdorman@ocsan.gov / (714) 593 7014 Director of Environmental Services: Lan Wiborg, lwiborg@ocsan.gov / (714) 593 7450 Director of Finance: Wally Ritchie, writchie@ocsan.gov / (714) 593 7570 Director of Human Resources: Laura Maravilla, lmaravilla@ocsan.gov / (714) 593 7007 Director of Operations & Maintenance: Riaz Moinuddin, rmoinuddin@ocsan.gov / (714) 593 7269 View Current Board of Directors BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, April 22, 2026 CALL TO ORDER Board Chairman Ryan Gallagher INVOCATION AND PLEDGE OF ALLEGIANCE Director Bob Ooten, Costa Mesa Sanitary District ROLL CALL AND DECLARATION OF QUORUM Clerk of the Board PUBLIC COMMENTS: Your participation is always welcome. Specific information as to how to participate in a meeting is detailed in the Special Notice attached to this agenda. In general, OC San offers several ways in which to interact during meetings: you may participate in person, join the meeting live via Teams on your computer or similar device or web browser, join the meeting live via telephone, view the meeting online, and/or submit comments for consideration before or during the meeting. SPECIAL PRESENTATIONS: 1.2026-4866EMPLOYEE SERVICE AWARDS 20-year Service Awards Luis Gasca, Electrical Tech II - Division 880 Aaron Suarez, Maintenance Superintendent - Division 880 Originator:Kelly Lore REPORTS: The Board Chairperson and the General Manager may present verbal reports on miscellaneous matters of general interest to the Directors. These reports are for information only and require no action by the Directors. CONSENT CALENDAR: Consent Calendar Items are considered to be routine and will be enacted, by the Board of Directors, after one motion, without discussion. Any items withdrawn from the Consent Calendar for separate discussion will be considered in the regular order of business. 2.2026-4707APPROVAL OF MINUTES RECOMMENDATION: Approve minutes of the Regular meeting of the Board of Directors held March 25, 2026. Page 2 of 8 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, April 22, 2026 Originator:Kelly Lore Attachments: RECEIVE AND FILE: 3.2026-4683COMMITTEE MEETING MINUTES RECOMMENDATION: Receive and file the following: A. Minutes of the Steering Committee Meeting held February 25, 2026 B. Minutes of the Operations Committee Meeting held March 4, 2026 C. Minutes of the Administration Committee Meeting held March 11, 2026 Originator:Kelly Lore Attachments: 4.2026-4748REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF MARCH 2026 RECOMMENDATION: Receive and file the following: Report of the Investment Transactions for the month of March 2026. Originator:Wally Ritchie Attachments: OPERATIONS COMMITTEE: 5.2026-4868MACARTHUR PUMP STATION REHABILITATION, PROJECT NO. 7-63 RECOMMENDATION: A. Approve a Professional Design Services Agreement with Dudek to provide engineering services for MacArthur Pump Station Rehabilitation, Project No. 7-63, for an amount not to exceed $1,140,000; and B. Approve a contingency of $114,000 (10%). Originator:Mike Dorman Page 3 of 8 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, April 22, 2026 Agenda Report 7-63 PDSA Attachments: 6.2026-4870CENTRAL GENERATION ENGINE NO. 1 INSPECTION AND REPAIRS, SPECIFICATION NO. BSS-2026-728BD RECOMMENDATION: A. Approve a Sole Source Service Contract with Cooper Machinery Services LLC for inspection and field service repairs to Central Generation (Cen Gen) Engine No. 1, Specification No. BSS-2026-728BD, for a total amount not to exceed $142,923, plus applicable sales tax and freight; and B. Approve additional allowance funding not to exceed $120,000 for associated repairs that may be required due to the high potential for additional damage identified during disassembly and inspection. Originator:Riaz Moinuddin Attachments: 7.2026-4871MASTER REIMBURSEMENT AGREEMENT FOR MANHOLE FRAME AND COVER OVERLAY RECOMMENDATION: A. Approve a Master Reimbursement Agreement with the City of Cypress, Specs. S-050A, S-055, and S-055A, establishing terms, procedures, and reimbursement for Orange County Sanitation District manhole frame and cover adjustments performed as part of Cypress Street Rehabilitation projects, in a standardized form approved by General Counsel; and B. Approve the Master Reimbursement Agreement Template and authorize the General Manager to execute future Master Reimbursement Agreements with other municipalities under similar terms, as approved by General Counsel. Originator:Riaz Moinuddin Attachments: Page 4 of 8 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, April 22, 2026 8.2026-4872HEADWORKS ELECTRICAL DISTRIBUTION IMPROVEMENTS AT PLANT NO. 2, PROJECT NO. P2-141 RECOMMENDATION: A. Approve a project budget increase of $11,848,000 for Headworks Electrical Distribution Improvements at Plant No. 2, Project No. P2-141, for a total project budget of $46,500,000; B. Approve a Progressive Design-Build Contract with Big Sky Electric, Inc./Filanc, a Joint Venture, to provide Phase 1 progressive design-build services for Headworks Electrical Distribution Improvements at Plant No. 2, Project No. P2-141, for an amount not to exceed $3,902,200; and C. Approve an upper limit for this Contract of $39,710,000, which includes contingency. Originator:Mike Dorman Attachments: ADMINISTRATION COMMITTEE: 9.2026-4877PUBLIC AFFAIRS UPDATE FOR THE MONTH OF MARCH 2026 RECOMMENDATION: Receive and file the Public Affairs Update for the month of March 2026. Originator:Jennifer Cabral Attachments: 10.2026-4878LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF MARCH 2026 RECOMMENDATION: Receive and file the Legislative Affairs Update for the month of March 2026. Originator:Jennifer Cabral Page 5 of 8 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, April 22, 2026 Agenda Report Federal Legislative Update Federal Matrix State Legislative Update State Matrix Local Legislative Update AB 2381 (Johnson) Support AB 2381 (Johnson) Bill Language AB 2180 (Ward) Support AB 2180 (Ward) Bill Language Presentation - Local Legislative Update Attachments: 11.2026-4879FY 2025-26 BUDGET AMENDMENT RECOMMENDATION: Approve a budget increase of $68,000,000 for FY 2025-26, for a total budget as follows: FY 2025-26 Net Operating $260,365,399 Self-Insurance $ 6,745,565 Net Capital Improvement Program $317,959,620 Debt/COP Service $ 60,431,104 Intra-District Joint Equity Purchase/Sale (1) $ 3,500,000 Total $649,001,688 (1) Cash to/from Revenue Area 14 (RA14) in exchange for capital assets to/from Consolidated Revenue Area 15 (RA15) Originator:Wally Ritchie Attachments: STEERING COMMITTEE: 12.2026-4885GENERAL SERVICES CONTRACT FOR SECURITY SERVICES RECOMMENDATION: A. Approve a General Services Contract for Inter-Con Security Systems, Inc. to provide Security Services, Specification No. S-2025-707BD, for an initial 13-month term with a total amount not to exceed $2,972,354 for the period beginning June 1, 2026, through June 30, 2027, with four one-year renewal options. Compensation for subsequent annual renewal options shall be a total annual amount not to exceed $2,743,711; and Page 6 of 8 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, April 22, 2026 B. Approve an annual contingency of $274,371 (10%) for the contract period and all remaining renewal periods. Originator:Laura Maravilla Attachments: NON-CONSENT: None. INFORMATION ITEMS: AB 1234 DISCLOSURE REPORTS: This item allows Board members to provide a brief oral report regarding the disclosure of outside committees, conferences, training, seminars, etc. attended at the Agency’s expense, per Government Code §53232.3(d). • Report from Board Delegate - ISDOC • Report from Board Delegate - NWRI • Report from Board Delegate - OCCOG • Report from Board Delegate - SARFPA • Report from GWRS Steering Committee Member(s) • Other CLOSED SESSION: During the course of conducting the business set forth on this agenda as a regular meeting of the Board, the Chairperson may convene the Board in closed session to consider matters of pending real estate negotiations, pending or potential litigation, or personnel matters, pursuant to Government Code Sections 54956.8, 54956.9, 54957 or 54957.6, as noted. Reports relating to (a) purchase and sale of real property; (b) matters of pending or potential litigation; (c) employment actions or negotiations with employee representatives; or which are exempt from public disclosure under the California Public Records Act, may be reviewed by the Board during a permitted closed session and are not available for public inspection. At such time the Board takes final action on any of these subjects, the minutes will reflect all required disclosures of information. CS-1 2026-4883CONFERENCE WITH LEGAL COUNSEL RE ANTICIPATED LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(4) RECOMMENDATION: Convene in Closed Session: Number of Potential Cases: 1 Initiation of litigation. Attachments: Page 7 of 8 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, April 22, 2026 CONVENE IN CLOSED SESSION. RECONVENE IN REGULAR SESSION. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: At this time Directors may request staff to place an item on a future agenda. ADJOURNMENT Adjourn the Board meeting until the next meeting of the Board of Directors on May 27, 2026 at 6:00 p.m. AFFIDAVIT OF POSTING I hereby certify under penalty of perjury and as required by the State of California, Government Code § 54954.2(a), that the foregoing Agenda was posted online at www.ocsan.gov, in the lobby, and outside the main door of Orange County Sanitation District Headquarters at 18480 Bandilier Cir. Fountain Valley, CA 92708 not less than 72 hours prior to the meeting date and time above. All public records relating to each agenda item, including those distributed less than 72 hours prior to the meeting to a majority of the Board of Directors, are available for public inspection with the Clerk of the Board. /s/ Kelly A. Lore, MMC Clerk of the Board April 15, 2026 Page 8 of 8 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4707 Agenda Date:4/22/2026 Agenda Item No:2. FROM:Robert Thompson, General Manager Originator: Kelly A. Lore, Clerk of the Board SUBJECT: APPROVAL OF MINUTES GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve minutes of the Regular meeting of the Board of Directors held March 25, 2026. BACKGROUND In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting will be provided to the Directors for subsequent approval at the following meeting. RELEVANT STANDARDS ·Resolution No. OC SAN 26-02 ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·March 25, 2026 Board of Directors meeting minutes Orange County Sanitation District Printed on 4/14/2026Page 1 of 1 powered by Legistar™ ORANGE COUNTY SANITATION DISTRICT MINUTES BOARD OF DIRECTORS MARCH 25, 2026 Board Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 BOARD OF DIRECTORS Minutes March 25, 2026 CALL TO ORDER A regular meeting of the Board of Directors of the Orange County Sanitation District was called to order by Board Chairman Ryan Gallagher on Wednesday, March 25, 2026 at 6:00 p.m. in the Orange County Sanitation District Headquarters. Director Jordan Wu delivered the invocation and led the Pledge of Allegiance. ROLL CALL AND DECLARATION OF QUORUM The Clerk of the Board declared a quorum present as follows: PRESENT:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu ABSENT:Jose Medrano STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Lan Wiborg, Director of Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; Mortimer Caparas; Belen Carrillo; Daisy Covarrubias; Don Cutler; Thys DeVries; Al Garcia; Al Garcia; David Haug; Matt Killion; Rob Michaels; Tania Moore; Thomas Vu; Kevin Work; and Sammady Yi were present in the Board Room. OTHERS PRESENT: Scott Smith, General Counsel, and Ryan Baron, Assistant General Counsel were present in the Board room. Chad Colton, Best Best & Krieger; Michael Aaron; and Andy Neff were present virtually. PUBLIC COMMENTS: Ted Beresford, Kathy Stephens, Scott Monastra, and Francis La Placa spoke in opposition to the easement clearing construction on Rhone Lane. Alternate Director Leo Medrano provided comments of his participation at the Wastewater 101 Citizens' Academy. SPECIAL PRESENTATIONS: 1.WASTEWATER 101 CITIZENS’ ACADEMY GRADUATION 2026-4789 Originator: Kelly Lore Page 1 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 Dunlap; Ahtiziri Meneses; Estvan Gomez; Dennis La Salle; and Jared Sanchez. 2. EMPLOYEE SERVICE AWARDS 2026-4790 Originator: Kelly Lore 20-year Service Awards Matthew Killion, Information Tech Supervisor - Division 760 Ludwig Lapus, Principal Contracts Administrator - Division 230 REPORTS: Chair Gallagher reported that Directors and Alternate Directors would receive talking points highlighting OC San activities. These are designed to support outreach efforts for reporting to councils, boards, and community groups ensuring consistent messaging about OC San. General Manager Rob Thompson provided an update on the Miller-Holder Rhone Lane Easement cleanup and noted that the Clerk of the Board distributed an OC San News Alert regarding recent media coverage related to construction affecting 13 Huntington Beach homeowners. He added that all news coverage will be included in the Public Affairs Outreach Report and shared with the Board of Directors. Mr. Thompson announced that proposed adjustments to the current budget, including the addition of several full-time positions, will be presented to the Committees next month. Mr. Thompson reported on his attendance at the State of the City events for Fountain Valley, Irvine, and Orange, as well as the SCCWRP Commission Meeting and the WateReuse Symposium, where OC San received an award for the Wastewater 101 Citizens’ Academy. Mr. Thompson highlighted an upcoming OC San training opportunity for cities and special districts within the service area. The next in-person class will be held Tuesday, April 28, and will be a two-hour course led by a UCI instructor on Collaboration and Problem Solving. Agencies may enroll up to three employees by April 23 at a cost of $23 per participant. Clerk of the Board Kelly Lore reminded Board members of the upcoming Conflict of Interest Form 700 filing deadline on Wednesday, April 1, 2026. She noted that all OC San Directors and Alternate Directors must file electronically with the FPPC this year and encouraged anyone experiencing filing issues to contact her office. Page 2 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 CONSENT CALENDAR: 3.APPROVAL OF MINUTES 2026-4706 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Approve minutes of the Regular meeting of the Board of Directors held February 25, 2026. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 4.UPDATE TO RECORDS MANAGEMENT PROGRAM PROCEDURES AND RECORDS RETENTION SCHEDULE RESOLUTION 2026-4817 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Adopt Resolution No. OC SAN 26-05 entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District Adopting the Records Management Program Procedures and Records Retention Schedule, Authorizing Destruction of Obsolete Records, and Repealing Resolution No. OC SAN 26-03”. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None Page 3 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 RECEIVE AND FILE: 5.COMMITTEE MEETING MINUTES 2026-4682 Originator: Kelly Lore WITHOUT OBJECTION ACTION TAKEN TO RECEIVE AND FILE THE FOLLOWING: A. Minutes of the Steering Committee Meeting held January 28, 2026 B. Minutes of the Operations Committee Meeting held February 4, 2026 C. Minutes of the Administration Committee Meeting held February 11, 2026 6.REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF FEBRUARY 2026 2026-4746 Originator: Wally Ritchie WITHOUT OBJECTION ACTION TAKEN TO RECEIVE AND FILE THE FOLLOWING: Report of the Investment Transactions for the month of February 2026. OPERATIONS COMMITTEE: 7.SECONDARY TREATMENT AREA CABLE REPLACEMENT AT PLANT NO. 1, PROJECT NO. FR1-0023 2026-4829 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: A. Receive and file Bid Tabulation and Recommendation for Secondary Treatment Area Cable Replacement at Plant No. 1, Project No. FR1-0023; B. Award a Construction Contract Agreement to Big Sky Electric, Inc., for Secondary Treatment Area Cable Replacement at Plant No. 1, Project No. FR1-0023, for a total amount not to exceed $298,102; and C. Approve a contingency of $59,600 (20%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano Page 4 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 ABSTENTIONS:None 8.TRICKLING FILTER ODOR CONTROL STUDY AT PLANT NO. 1, PROJECT NO. PS24-04 2026-4830 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Professional Services Agreement with Black & Veatch Corporation to provide engineering services for the Trickling Filter Odor Control Study at Plant No. 1, Project No. PS24-04, for an amount not to exceed $548,506; and B. Approve a contingency of $54,851 (10%). AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 9.ENGINEERING PROGRAM CONTRACT PERFORMANCE REPORT 2026-4831 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Engineering Program Contract Performance Report for the period ending December 31, 2025. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 10.SECONDARY TREATMENT VFD REPLACEMENTS AT PLANT NO. 2 AND VFD REPLACEMENTS AT PLANT NO. 1, PROJECT NOS. FE19-08 AND FR1-0011 2026-4833 Originator: Mike Dorman Page 5 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 MOVED, SECONDED, AND DULY CARRIED TO: AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 11.NEWHOPE-PLACENTIA SEWER MANHOLE REPLACEMENTS, PROJECT NO. FE21-08 2026-4834 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None ADMINISTRATION COMMITTEE: 12.FLEET MOBILE EQUIPMENT REPLACEMENT PURCHASES 2026-4841 Page 6 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 Originator: Lorenzo Tyner MOVED, SECONDED, AND DULY CARRIED TO: AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 13.LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF FEBRUARY 2026 2026-4842 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Legislative Affairs Update for the month of February 2026. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 14.PUBLIC AFFAIRS UPDATE FOR THE MONTH OF FEBRUARY 2026 2026-4843 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Page 7 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 Receive and file the Public Affairs Update for the month of February 2026. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 15.PROPERTY MANAGEMENT SERVICES FOR 18350 MT. LANGLEY STREET AND 18250 EUCLID STREET, FOUNTAIN VALLEY 2026-4844 Originator: Lorenzo Tyner MOVED, SECONDED, AND DULY CARRIED TO: AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 16.COMPREHENSIVE COST OF SERVICE RATE STUDY, SPECIFICATION NO. CS-2025-711BD 2026-4845 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Professional Consultant Services Agreement with HDR Engineering, Inc. to perform a Comprehensive Cost of Service Rate Study, Specification No. CS-2025-711BD, for a total amount not to exceed $254,280; and B. Approve a contingency of $25,428 (10%). Page 8 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None 17.ORANGE COUNTY WASTE AND RECYCLING WASTE INFRASTRUCTURE SYSTEM ENTERPRISE AGREEMENT AND ORGANIC SERVICES AGREEMENT 2026-4846 Originator: Lan Wiborg MOVED, SECONDED, AND DULY CARRIED TO: AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None STEERING COMMITTEE: 18.PLANT NO. 1 ADDED FACILITIES AGREEMENT RENEWAL WITH SOUTHERN CALIFORNIA EDISON COMPANY 2026-4851 Originator: Riaz Moinuddin MOVED, SECONDED, AND DULY CARRIED TO: Page 9 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 Approve the Added Facilities Agreement with Southern California Edison Company and Orange County Sanitation District, for the Orcosan Substation at Plant No. 1, AF00801-001, ensuring perpetual replacement cost coverage. AYES:Joyce Ahn, Debbie Baker, Ted Bui, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Bonnie Peat, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jose Medrano ABSTENTIONS:None NON-CONSENT: None. INFORMATION ITEMS: None. AB 1234 DISCLOSURE REPORTS: Directors Pat Burns, Andrew Nguyen, Bob Ooten, and Dave Shawver provided a report on their recent attendance at various Regional Board Meetings. Director Hernandez departed the meeting at 6:51 p.m. CLOSED SESSION: The Board convened in closed session at 6:51 p.m. Confidential minutes of the Closed Sessions have been prepared in accordance with the above Government Code Sections and are maintained by the Clerk of the Board in the Official Book of Confidential Minutes of Board and Committee Closed Session meetings. Director Jamie Valencia departed the meeting during Closed Session at approximately 6:57 p.m. CS-1 CONFERENCE WITH LEGAL COUNSEL RE ANTICIPATED LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(4) 2026-4850 CONVENED IN CLOSED SESSION: Page 10 of 11 BOARD OF DIRECTORS Minutes March 25, 2026 Number of Potential Cases: 1 Initiation of litigation. RECONVENED IN REGULAR SESSION. The Board reconvened in regular session at 7:02 p.m. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: General Counsel Scott Smith stated there was no reportable action. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: At 7:02 p.m., Chair Gallagher adjourned the meeting until the next Regular Meeting of the Board of Directors to be held on Wednesday, March 25, 2026 at 6:00 p.m. Submitted by: __________________ Kelly A. Lore, MMC Clerk of the Board Page 11 of 11 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4683 Agenda Date:4/22/2026 Agenda Item No:3. FROM:Robert Thompson, General Manager Originator: Kelly A. Lore, Clerk of the Board SUBJECT: COMMITTEE MEETING MINUTES GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the following: A. Minutes of the Steering Committee Meeting held February 25, 2026 B. Minutes of the Operations Committee Meeting held March 4, 2026 C. Minutes of the Administration Committee Meeting held March 11, 2026 BACKGROUND In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting will be provided to the Directors for subsequent approval at the following meeting. RELEVANT STANDARDS ·Resolution No. OC SAN 24-09 ADDITIONAL INFORMATION The minutes of the Committee meetings are approved at their respective Committees and brought forth to the Board of Directors for receive and file only. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Minutes of the Monthly Committee Meetings Orange County Sanitation District Printed on 4/14/2026Page 1 of 1 powered by Legistar™ Orange County Sanitation District Minutes for the STEERING COMMITTEE Wednesday, February 25, 2026 5:00 PM Headquarters - Huntington Beach Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Steering Committee of the Orange County Sanitation District was called to order by Board Chairman Ryan Gallagher on Wednesday, February 25, 2026 at 5:00 p.m. in the Huntington Beach Room at Orange County Sanitation District Headquarters. ROLL CALL AND DECLARATION OF QUORUM: The Clerk of the Board declared a quorum present as follows: PRESENT:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon, Christine Marick and John Withers ABSENT:Chad Wanke STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Lan Wiborg, Director of Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; Morty Caparas; Jackie Castro; Sam Choi; Raul Cuellar; Thys DeVries; Martin Dix; Justin Fenton; David Haug; Mark Kawamoto; Tom Meregillano; Sammady Yi; and Kevin Work were present in the Huntington Beach Room. OTHERS PRESENT: Scott Smith, General Counsel; Shawn Cobb, Special Counsel, Allen Matkins; and Danielle Dychter, Special Counsel, Michael Sullivan & Associates LLP, were present in the Huntington Beach Room. PUBLIC COMMENTS: None. REPORTS: Chair Gallagher and General Manager Rob Thompson did not provide reports. CONSENT CALENDAR: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Page 1 of 3 STEERING COMMITTEE Minutes February 25, 2026 Approve minutes of the Regular meeting of the Steering Committee held January 28, 2026. AYES:Ryan Gallagher, Jon Dumitru, Pat Burns, Carlos Leon and Christine Marick NOES:None ABSENT:Chad Wanke and John Withers ABSTENTIONS:None NON-CONSENT: None. INFORMATION ITEMS: None. DEPARTMENT HEAD REPORTS: None. CLOSED SESSION: CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTION 54956.9(d)(1). The Committee convened in closed session at 5:02 p.m. Confidential minutes of the Closed Sessions have been prepared in accordance with the above Government Code Sections and are maintained by the Clerk of the Board in the Official Book of Confidential Minutes of Board and Committee Closed Session meetings. Director John Withers arrived at 5:12 p.m. during Closed Session Item No. CS-1(A). CS-1 CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(1) 2026-4778 CONVENED IN CLOSED SESSION: Number of Cases: 2 A. Emmanuel Rios v. Orange County Sanitation District, Workers’ Compensation Claim, Workers’ Compensation Appeals Board, Case No. ADJ20936106; and. B. Michael Oberly v. Orange County Sanitation District and Does 1-25, Orange County Superior Court Case No. 30-2025-01489491-CU-OE-CJC. Page 2 of 3 STEERING COMMITTEE Minutes February 25, 2026 CS-2 CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(1) 2026-4791 CONVENED IN CLOSED SESSION: 2:18-CV-05836-MWF(PLAx). RECONVENED IN REGULAR SESSION. The Committee reconvened in regular session at 5:27 p.m. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: General Counsel Scott Smith stated there was no reportable action. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: Chair Gallagher declared the meeting adjourned at 5:28 p.m. to the next Regular Steering Committee meeting to be held on Wednesday, March 25, 2026 at 5:00 p.m. Submitted by: __________________ Kelly A. Lore, MMC Clerk of the Board Page 3 of 3 Orange County Sanitation District Minutes for the OPERATIONS COMMITTEE Wednesday, March 4, 2026 5:00 PM Headquarters - Board Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Operations Committee of the Orange County Sanitation District was called to order by Board Chairman Ryan Gallagher on Wednesday, March 4, 2026 at 5:00 p.m. in the Orange County Sanitation District Headquarters. Chairman Gallagher led the Pledge of Allegiance. ROLL CALL AND DECLARATION OF QUORUM: Assistant Clerk of the Board Tania Moore declared a quorum present as follows: PRESENT:Joyce Ahn, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Lisa Landau, Tom Lindsey, Robert Ooten, Bonnie Peat and John Withers ABSENT:Pat Burns, Stephanie Klopfenstein and Carlos Leon STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Tania Moore, Assistant Clerk of the Board; Mo Abiodun; Daniel Berokoff; Jon Bradley, Cheri Calisang; Sam Choi, Andrew Cole, Raul Cuellar, Don Cutler, Thys DeVries, Martin Dix, Justin Fenton, Al Garcia; David Haug, Mark Kawamoto, Tom Meregilliano, Kelly Newell, Nick Oswald, Aldwin Ramirez; Valerie Ratto, Thomas Vu; Todd Waltz, Kevin Work; and Ruth Zintzun were present in the Board Room. OTHERS PRESENT: Mal Richardson, General Counsel; Ruby Kaura, Brown and Caldwell; and Jeff Mohr were present in the Board Room. PUBLIC COMMENTS: None. Ms. Moore announced that Late Communication was received after the publication of the agenda, from the Director of Engineering for Item No. 6 modifying the contract amount not to exceed $3,085,300 with a contingency of $308,530, and was distributed to the Committee and made available to the public. Page 1 of 6 OPERATIONS COMMITTEE Minutes March 4, 2026 REPORTS: Chair Gallagher and General Manager Rob Thompson did not provide reports. CONSENT CALENDAR: 1.APPROVAL OF MINUTES 2026-4720 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: AYES:Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Joyce Ahn, Pat Burns, Johnathan Ryan Hernandez, Stephanie Klopfenstein and Carlos Leon ABSTENTIONS:None 2.SECONDARY TREATMENT AREA CABLE REPLACEMENT AT PLANT NO. 1, PROJECT NO. FR1-0023 2025-4351 Originator: Mike Dorman A. Receive and file Bid Tabulation and Recommendation for Secondary Treatment Area Cable Replacement at Plant No. 1, Project No. FR1-0023; B. Award a Construction Contract Agreement to Big Sky Electric, Inc., for Secondary Treatment Area Cable Replacement at Plant No. 1, Project No. FR1-0023, for a total amount not to exceed $298,102; and C. Approve a contingency of $59,600 (20%). AYES:Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Joyce Ahn, Pat Burns, Johnathan Ryan Hernandez, Stephanie Klopfenstein and Carlos Leon ABSTENTIONS:None 3.TRICKLING FILTER ODOR CONTROL STUDY AT PLANT NO. 1, PROJECT NO. PS24-04 2025-4579 Page 2 of 6 OPERATIONS COMMITTEE Minutes March 4, 2026 Originator: Mike Dorman A. Approve a Professional Services Agreement with Black & Veatch Corporation to provide engineering services for the Trickling Filter Odor Control Study at Plant No. 1, Project No. PS24-04, for an amount not to exceed $548,506; and B. Approve a contingency of $54,851 (10%). AYES:Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Joyce Ahn, Pat Burns, Johnathan Ryan Hernandez, Stephanie Klopfenstein and Carlos Leon ABSTENTIONS:None 4.ENGINEERING PROGRAM CONTRACT PERFORMANCE REPORT 2026-4716 Originator: Mike Dorman Receive and file the Engineering Program Contract Performance Report for the period ending December 31, 2025. AYES:Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Joyce Ahn, Pat Burns, Johnathan Ryan Hernandez, Stephanie Klopfenstein and Carlos Leon ABSTENTIONS:None NON-CONSENT: 5.SECONDARY TREATMENT VFD REPLACEMENTS AT PLANT NO. 2 AND VFD REPLACEMENTS AT PLANT NO. 1, PROJECT NOS. FE19-08 AND FR1-0011 2025-4617 Originator: Mike Dorman Page 3 of 6 OPERATIONS COMMITTEE Minutes March 4, 2026 A. Receive and file Bid Tabulation and Recommendation for Secondary Treatment VFD Replacements at Plant No. 2 and VFD Replacements at Plant No. 1, Project Nos. FE19-08 and FR1-0011; B. Award a Construction Contract Agreement to Big Sky Electric, Inc. for Secondary Treatment VFD Replacements at Plant No. 2 and VFD Replacements at Plant No. 1, Project Nos. FE19-08 and FR1-0011, for an amount not to exceed $3,424,300; and C. Approve a contingency of $342,430 (10%). AYES:Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Tom Lindsey, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Joyce Ahn, Pat Burns, Johnathan Ryan Hernandez, Stephanie Klopfenstein and Carlos Leon ABSTENTIONS:None Directors Joyce Ahn and Johnathan Ryan Hernandez arrived at the meeting at 5:04 p.m. 6.NEWHOPE-PLACENTIA SEWER MANHOLE REPLACEMENTS, PROJECT NO. FE21-08 2026-4756 Originator: Mike Dorman AYES:Joyce Ahn, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Lisa Landau, Tom Lindsey, Robert Ooten, Bonnie Peat and John Withers NOES:None ABSENT:Pat Burns, Stephanie Klopfenstein and Carlos Leon ABSTENTIONS:None Page 4 of 6 OPERATIONS COMMITTEE Minutes March 4, 2026 INFORMATION ITEMS: 7.PROCUREMENT PROCESS, BIDS VS RFPS, SOLE SOURCE CONTRACTS VS COMPETITIVE CONTRACTS 2026-4667 Originator: Wally Ritchie Information Item. 8.FY 2026-27 AND 2027-28 ORANGE COUNTY SANITATION DISTRICT BUDGET REVENUES AND RESERVES OVERVIEW 2026-4668 Originator: Wally Ritchie Information Item. DEPARTMENT HEAD REPORTS: None. CLOSED SESSION: None. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. Page 5 of 6 OPERATIONS COMMITTEE Minutes March 4, 2026 BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: Chair Gallagher declared the meeting adjourned at 5:37 p.m. to the next Regular Operations Committee meeting to be held on Wednesday, April 1, 2026 at 5:00 p.m. Submitted by: _____________________ Tania Moore, CMC Assistant Clerk of the Board Page 6 of 6 Orange County Sanitation District Minutes for the ADMINISTRATION COMMITTEE Wednesday, March 11, 2026 5:00 PM Headquarters - Board Room 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Administration Committee of the Orange County Sanitation District was called to order by Committee Vice Chairwoman Jamie Valencia on Wednesday, March 11, 2026 at 5:00 p.m. in the Orange County Sanitation District Headquarters. Director Jose Medrano led the Pledge of Allegiance. ROLL CALL AND DECLARATION OF QUORUM: Assistant Clerk of the Board Jackie Castro declared a quorum present as follows: PRESENT:Debbie Baker, Ted Bui, Jon Dumitru, Melinda Liu, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand and Jordan Wu ABSENT:Ryan Gallagher STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Jackie Castro, Assistant Clerk of the Board; Mo Abiodun; Cheri Calisang; Morty Caparas; Belen Carrillo; Sam Choi; Daisy Covarrubias; Thys DeVries; Al Garcia; Mark Kawamoto; Rebecca Long; Tom Meregillano; Rob Michaels; Don Nguyen; Don Stokes; Thomas Vu; Kevin Work; Sammady Yi; and Ruth Zintzun were present in the Board Room. OTHERS PRESENT: Scott Smith, General Counsel, and Jason Celente and Thierno Sylla, Insight Investment, were present in the Board Room. Eric Sapirstein, ENS Resources, was present virtually. PUBLIC COMMENTS: None. REPORTS: Vice Chair Valencia and General Manager Rob Thompson did not provide reports. Page 1 of 7 ADMINISTRATION COMMITTEE Minutes March 11, 2026 CONSENT CALENDAR: 1. APPROVAL OF MINUTES 2026-4730 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Approve minutes of the Regular meeting of the Administration Committee held February 11, 2026. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Jose Medrano, Jordan Nefulda, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand and Jordan Wu NOES:None ABSENT:Ryan Gallagher, Melinda Liu and Christine Marick ABSTENTIONS:None 2. FLEET MOBILE EQUIPMENT REPLACEMENT PURCHASES 2026-4802 Originator: Lorenzo Tyner AYES:Debbie Baker, Ted Bui, Jon Dumitru, Jose Medrano, Jordan Nefulda, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand and Jordan Wu NOES:None ABSENT:Ryan Gallagher, Melinda Liu and Christine Marick ABSTENTIONS:None NON-CONSENT: Director Melinda Liu arrived at the meeting at 5:11 p.m. 3. LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF FEBRUARY 2026 2026-4807 Page 2 of 7 ADMINISTRATION COMMITTEE Minutes March 11, 2026 Originator: Jennifer Cabral Receive and file the Legislative Affairs Update for the month of February 2026. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Melinda Liu, Jose Medrano, Jordan Nefulda, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand and Jordan Wu NOES:None ABSENT:Ryan Gallagher and Christine Marick ABSTENTIONS:None Committee Chair Christine Marick arrived at the meeting at 5:24 p.m. 4. PUBLIC AFFAIRS UPDATE FOR THE MONTH OF FEBRUARY 2026 2026-4812 Originator: Jennifer Cabral Receive and file the Public Affairs Update for the month of February 2026. AYES:Debbie Baker, Ted Bui, Jon Dumitru, Melinda Liu, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand and Jordan Wu NOES:None ABSENT:Ryan Gallagher ABSTENTIONS:None Page 3 of 7 ADMINISTRATION COMMITTEE Minutes March 11, 2026 5. PROPERTY MANAGEMENT SERVICES FOR 18350 MT. LANGLEY STREET AND 18250 EUCLID STREET, FOUNTAIN VALLEY 2026-4814 Originator: Lorenzo Tyner AYES:Debbie Baker, Ted Bui, Jon Dumitru, Melinda Liu, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand and Jordan Wu NOES:None ABSENT:Ryan Gallagher ABSTENTIONS:None 6. COMPREHENSIVE COST OF SERVICE RATE STUDY, SPECIFICATION NO. CS-2025-711BD 2026-4769 Originator: Wally Ritchie A. Approve a Professional Consultant Services Agreement with HDR Engineering, Inc. to perform a Comprehensive Cost of Service Rate Study, Specification No. CS-2025-711BD, for a total amount not to exceed $254,280; and B. Approve a contingency of $25,428 (10%). AYES:Debbie Baker, Ted Bui, Jon Dumitru, Melinda Liu, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, David Shawver, Jamie Valencia, Chad Wanke, Erik Weigand and Jordan Wu NOES:None ABSENT:Ryan Gallagher ABSTENTIONS:None Page 4 of 7 ADMINISTRATION COMMITTEE Minutes March 11, 2026 7. ORANGE COUNTY WASTE AND RECYCLING WASTE INFRASTRUCTURE SYSTEM ENTERPRISE AGREEMENT AND ORGANIC SERVICES AGREEMENT 2026-4819 Originator: Lan Wiborg AYES:Debbie Baker, Ted Bui, Jon Dumitru, Melinda Liu, Christine Marick, Jose Medrano, Jordan Nefulda, Andrew Nguyen, Jamie Valencia, Chad Wanke, Erik Weigand and Jordan Wu NOES:David Shawver ABSENT:Ryan Gallagher ABSTENTIONS:None INFORMATION ITEMS: 8. INVESTMENT PERFORMANCE RESULTS 2026-4743 Originator: Wally Ritchie Information Item. Page 5 of 7 ADMINISTRATION COMMITTEE Minutes March 11, 2026 Chair Marick announced that, per Staff recommendation, Item No. 10 would be heard before Item No. 9. 10. FY 2026-27 AND 2027-28 ORANGE COUNTY SANITATION DISTRICT BUDGET REVENUES AND RESERVES OVERVIEW 2026-4745 Originator: Wally Ritchie Information Item. 9. PROCUREMENT PROCESS, BIDS VS RFPS, SOLE SOURCE CONTRACTS VS COMPETITIVE CONTRACTS 2026-4818 Originator: Wally Ritchie Information Item. DEPARTMENT HEAD REPORTS: None. CLOSED SESSION: None. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. Page 6 of 7 ADMINISTRATION COMMITTEE Minutes March 11, 2026 BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: Chair Marick declared the meeting adjourned at 6:11 p.m. to the next Regular Administration Committee meeting to be held on Wednesday, April 8, 2026 at 5:00 p.m. Submitted by: _____________________ Jackie Castro, CMC Assistant Clerk of the Board Page 7 of 7 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4748 Agenda Date:4/22/2026 Agenda Item No:4. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF MARCH 2026 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the following: Report of the Investment Transactions for the month of March 2026. BACKGROUND The CA Government Code requires that a monthly report of investment transactions be provided to the legislative body.Attached is the monthly report of investment transactions for the month ended March 31, 2026. RELEVANT STANDARDS ·CA Government Code Section 53607 PRIOR COMMITTEE/BOARD ACTIONS N/A FINANCIAL CONSIDERATIONS N/A ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Report of the Investment Transactions - March 2026 Orange County Sanitation District Printed on 4/15/2026Page 1 of 1 powered by Legistar™ Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Account Beginning Cash Principal Cash: - 25,891,491.82 Income Cash: 25,891,491.82 Total Cash: - 02-Mar- 26 02-Mar-26 3134GXCJ 1 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C M T N 0.650% 5/28/26 ------358.11 ---SEI 02-Mar- 26 02-Mar-26 05348EAX 7 I 300 PAID ACCRUED INTEREST ON PURCHASE OF AVALONBAY MTN 2.950% 5/11/26 ------2,481.36 ---SEI 02-Mar- 26 02-Mar-26 64952WED 1 I 300 PAID ACCRUED INTEREST ON PURCHASE OF NEW YORK LIFE MTN 1.150% 6/09/26 ------458.69 ---SEI 02-Mar- 26 02-Mar-26 3130ALHH 0 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 0.960% 3/05/26 ------1,486.80 ---SEI 02-Mar- 26 02-Mar-26 30231GAT 9 I 310 INTEREST EARNED ON EXXON MOBIL CORP 3.043% 3/01/26 $1 PV ON 2425000.0000 SHARES DUE 3/1/2026 -----36,896.38 ---SEI 02-Mar- 26 02-Mar-26 3133EPCF 0 I 310 INTEREST EARNED ON F F C B DEB 4.500% 3/02/26 $1 PV ON 1900000.0000 SHARES DUE 3/2/2026 -----42,750.00 ---SEI 02-Mar- 26 02-Mar-26 3130ALJ62 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 0.875% 3/24/26 ------979.27 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 1 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 02-Mar- 26 02-Mar-26 31846V567 FGZXX I 310 INTEREST EARNED ON FIRST AM GOVT OB FD CL Z UNIT ON 0.0000 SHARES DUE 2/28/2026 INTEREST FROM 2/1/26 TO 2/28/26 -----2,334.01 ---SEI 02-Mar- 26 27-Feb- 26 02-Mar-26 3130ALJ62 P 10 PURCHASED PAR VALUE OF F H L B DEB 0.875% 3/24/26 /STONEX FINANCIAL INC./255,000 PAR VALUE AT 99.824 % 255,000.0000 99.82 40 ----254,551.20 254,551.20 --SEI 02-Mar- 26 27-Feb- 26 02-Mar-26 05348EAX 7 P 10 PURCHASED PAR VALUE OF AVALONBAY MTN 2.950% 5/11/26 /CITIGROUP GLOBAL MARKETS INC./283,000 PAR VALUE AT 99.833 % 283,000.0000 99.83 30 ----282,527.39 282,527.39 --SEI 02-Mar- 26 27-Feb- 26 02-Mar-26 3130ALHH 0 P 10 PURCHASED PAR VALUE OF F H L B DEB 0.960% 3/05/26 /STONEX FINANCIAL INC./315,000 PAR VALUE AT 99.977 % 315,000.0000 99.97 70 ----314,927.55 314,927.55 --SEI 02-Mar- 26 27-Feb- 26 02-Mar-26 3134GXCJ 1 P 10 PURCHASED PAR VALUE OF F H L M C M T N 0.650% 5/28/26 /FTBMUS44SEC FIRST HORIZON US/211,000 PAR VALUE AT 99.26609953 % 211,000.0000 99.26 61 ----209,451.47 209,451.47 --SEI 02-Mar- 26 27-Feb- 26 02-Mar-26 64952WED 1 P 10 PURCHASED PAR VALUE OF NEW YORK LIFE MTN 1.150% 6/09/26 /PERSHING LLC/173,000 PAR VALUE AT 99.271 % 173,000.0000 99.27 10 ----171,738.83 171,738.83 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 2 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 02-Mar- 26 01-Mar- 26 01-Mar-26 30231GAT 9 P 20 MATURED PAR VALUE OF EXXON MOBIL CORP 3.043% 3/01/26 2,425,000 PAR VALUE AT 100 % - 2,425,000.000 0 100.0 000 ---2,425,000.00 - 2,424,951.50 48.50 -SEI 02-Mar- 26 02-Mar- 26 02-Mar-26 3133EPCF 0 P 20 MATURED PAR VALUE OF F F C B DEB 4.500% 3/02/26 1,900,000 PAR VALUE AT 100 % - 1,900,000.000 0 100.0 000 ---1,900,000.00 - 1,902,527.00 -2,527.00 -SEI 02-Mar- 26 02-Mar- 26 02-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,165,685.710 0 -----3,165,685.71 3,165,685.71 --SEI 02-Mar- 26 02-Mar- 26 02-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 4,660,500.860 0 ----4,660,500.86 - 4,660,500.86 --SEI 02-Mar- 26 02-Mar- 26 02-Mar-26 30229BC 39 P 10 PURCHASED PAR VALUE OF EXXON MOBIL CORP DISC C P 3/03/26 /J.P. MORGAN SECURITIES LLC/3,275,000 PAR VALUE AT 99.98988885 % 3,275,000.000 0 99.98 99 ----3,274,668.86 3,274,668.86 --SEI 02-Mar- 26 02-Mar- 26 02-Mar-26 59166HF 94 P 10 PURCHASED PAR VALUE OF METLIFE SHORT TERM FDG C P 6/09/26 /BOFA SECURITIES, INC./FXD INC/1,400,000 PAR VALUE AT 98.988 % 1,400,000.000 0 98.98 80 ----1,385,832.00 1,385,832.00 --SEI Post Date 02-Mar-26 Total ---2,334.01 71,403.65 -2,478.50 -SEI 03-Mar- 26 03-Mar-26 6944PL3B 3 PLM5926 I 300 PAID ACCRUED INTEREST ON PURCHASE OF PACIFIC LIFE MTN 4.54608% 3/27/26 ------4,763.91 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 3 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 03-Mar- 26 03-Mar-26 756109AZ 7 I 300 PAID ACCRUED INTEREST ON PURCHASE OF REALTY INCOME CORP 0.750% 3/15/26 ------1,897.00 ---SEI 03-Mar- 26 03-Mar-26 3130ALJ39 I 310 INTEREST EARNED ON F H L B DEB 0.900% 3/03/26 $1 PV ON 1000000.0000 SHARES DUE 3/3/2026 -----4,500.00 ---SEI 03-Mar- 26 03-Mar-26 3133ERGC 9 FFC4926 I 310 INTEREST EARNED ON F F C B DEB 3.71424% 6/03/26 $1 PV ON 700000.0000 SHARES DUE 3/3/2026 -----6,644.36 ---SEI 03-Mar- 26 03-Mar-26 30229BC 39 I 310 INTEREST EARNED ON EXXON MOBIL CORP DISC C P 3/03/26 $1 PV ON 3275000.0000 SHARES DUE 3/3/2026 3,275,000 PAR VALUE AT 100 % -----331.14 ---SEI 03-Mar- 26 02-Mar- 26 03-Mar-26 756109AZ 7 P 10 PURCHASED PAR VALUE OF REALTY INCOME CORP 0.750% 3/15/26 /RBC CAPITAL MARKETS, LLC/542,000 PAR VALUE AT 99.886 % 542,000.0000 99.88 60 ----541,382.12 541,382.12 --SEI 03-Mar- 26 02-Mar- 26 03-Mar-26 6944PL3B 3 PLM5926 P 10 PURCHASED PAR VALUE OF PACIFIC LIFE MTN 4.54608% 3/27/26 /PNCCUS31CMG PNC U.S./625,000 PAR VALUE AT 100.034 % 625,000.0000 100.0 340 ----625,212.50 625,212.50 --SEI 03-Mar- 26 03-Mar- 26 03-Mar-26 3130ALJ39 P 20 MATURED PAR VALUE OF F H L B DEB 0.900% 3/03/26 1,000,000 PAR VALUE AT 100 % - 1,000,000.000 0 100.0 000 ---1,000,000.00 -980,810.00 19,190.00 -SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 4 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 03-Mar- 26 03-Mar- 26 03-Mar-26 30229BC 39 P 20 MATURED PAR VALUE OF EXXON MOBIL CORP DISC C P 3/03/26 3,275,000 PAR VALUE AT 100 % - 3,275,000.000 0 100.0 000 ---3,274,668.86 - 3,274,668.86 --SEI 03-Mar- 26 03-Mar- 26 03-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,115,222.840 0 -----3,115,222.84 3,115,222.84 --SEI 03-Mar- 26 03-Mar- 26 03-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 1,309,313.530 0 ----1,309,313.53 - 1,309,313.53 --SEI 03-Mar- 26 03-Mar- 26 03-Mar-26 912797UC 9 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 6/30/26 /BMO- CHICAGO BRANCH/1,325,000 PAR VALUE AT 98.81611547 % 1,325,000.000 0 98.81 61 ----1,309,313.53 1,309,313.53 --SEI Post Date 03-Mar-26 Total ----2,334.01 26,338.60 19,190.00 -SEI 04-Mar- 26 04-Mar-26 3130ALGJ 7 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 1.000% 3/23/26 ------872.08 ---SEI 04-Mar- 26 04-Mar-26 3137BTAC 5 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C MLTCL MTG 3.300% 10/25/26 ------275.00 ---SEI 04-Mar- 26 27-Feb- 26 04-Mar-26 3137BTAC 5 P 10 PURCHASED PAR VALUE OF F H L M C MLTCL MTG 3.300% 10/25/26 /MORGAN STANLEY & CO. LLC/1,000,000 PAR VALUE AT 99.511719 % 1,000,000.000 0 99.51 17 ----995,117.19 995,117.19 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 5 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 04-Mar- 26 03-Mar- 26 04-Mar-26 3130ALGJ 7 P 10 PURCHASED PAR VALUE OF F H L B DEB 1.000% 3/23/26 /BOFA SECURITIES, INC./FXD INC/195,000 PAR VALUE AT 99.852 % 195,000.0000 99.85 20 ----194,711.40 194,711.40 --SEI 04-Mar- 26 04-Mar- 26 04-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 1,190,975.670 0 ----1,190,975.67 - 1,190,975.67 --SEI Post Date 04-Mar-26 Total -----1,147.08 --SEI 05-Mar- 26 05-Mar-26 3130ALHH 0 I 310 INTEREST EARNED ON F H L B DEB 0.960% 3/05/26 $1 PV ON 315000.0000 SHARES DUE 3/5/2026 -----1,512.00 ---SEI 05-Mar- 26 05-Mar- 26 05-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -652,381.1100 ----652,381.11 -652,381.11 --SEI 05-Mar- 26 05-Mar- 26 05-Mar-26 3130ALHH 0 P 20 MATURED PAR VALUE OF F H L B DEB 0.960% 3/05/26 315,000 PAR VALUE AT 100 % -315,000.0000 100.0 000 ---315,000.00 -314,927.55 72.45 -SEI Post Date 05-Mar-26 Total ---968,893.11 -967,308.66 72.45 -SEI 06-Mar- 26 06-Mar-26 30229BC 62 I 310 INTEREST EARNED ON EXXON MOBIL CORP DISC C P 3/06/26 $1 PV ON 625000.0000 SHARES DUE 3/6/2026 625,000 PAR VALUE AT 100 % -----567.19 ---SEI 06-Mar- 26 05-Mar- 26 06-Mar-26 912797SZ 1 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 3/17/26 /J.P. MORGAN SECURITIES LLC/400,000 PAR VALUE AT 99.8889925 % 400,000.0000 99.88 90 ----399,555.97 399,555.97 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 6 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 06-Mar- 26 06-Mar- 26 06-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 225,444.0300 -----225,444.03 225,444.03 --SEI 06-Mar- 26 06-Mar- 26 06-Mar-26 30229BC 62 P 20 MATURED PAR VALUE OF EXXON MOBIL CORP DISC C P 3/06/26 625,000 PAR VALUE AT 100 % -625,000.0000 100.0 000 ---624,432.81 -624,432.81 --SEI Post Date 06-Mar-26 Total ----567.19 --SEI 09-Mar- 26 09-Mar-26 3133EPCR 4 I 310 INTEREST EARNED ON F F C B DEB 4.750% 3/09/26 $1 PV ON 1100000.0000 SHARES DUE 3/9/2026 -----26,125.00 ---SEI 09-Mar- 26 09-Mar-26 3130ALFX 7 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 0.600% 3/10/26 ------3,878.33 ---SEI 09-Mar- 26 09-Mar- 26 09-Mar-26 3133EPCR 4 P 20 MATURED PAR VALUE OF F F C B DEB 4.750% 3/09/26 1,100,000 PAR VALUE AT 100 % - 1,100,000.000 0 100.0 000 ---1,100,000.00 - 1,100,784.30 -784.30 -SEI 09-Mar- 26 09-Mar- 26 09-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 1,126,125.000 0 -----1,126,125.00 1,126,125.00 --SEI 09-Mar- 26 09-Mar- 26 09-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 1,303,767.830 0 ----1,303,767.83 - 1,303,767.83 --SEI 09-Mar- 26 09-Mar- 26 09-Mar-26 3130ALFX 7 P 10 PURCHASED PAR VALUE OF F H L B DEB 0.600% 3/10/26 /MIZUHO SECURITIES USA INC./1,300,000 PAR VALUE AT 99.9915 % 1,300,000.000 0 99.99 15 ----1,299,889.50 1,299,889.50 --SEI Post Date 09-Mar-26 Total ----21,462.37 -784.30 -SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 7 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 10-Mar- 26 10-Mar-26 3130ALFX 7 I 310 INTEREST EARNED ON F H L B DEB 0.600% 3/10/26 $1 PV ON 1300000.0000 SHARES DUE 3/10/2026 -----3,900.00 ---SEI 10-Mar- 26 10-Mar- 26 10-Mar-26 3130ALFX 7 P 20 MATURED PAR VALUE OF F H L B DEB 0.600% 3/10/26 1,300,000 PAR VALUE AT 100 % - 1,300,000.000 0 100.0 000 ---1,300,000.00 - 1,299,889.50 110.50 -SEI 10-Mar- 26 10-Mar- 26 10-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -53,635.3100 ----53,635.31 -53,635.31 --SEI Post Date 10-Mar-26 Total ---1,357,535.31 - 1,353,524.81 110.50 -SEI 13-Mar- 26 13-Mar-26 3130AUU 36 I 310 INTEREST EARNED ON F H L B DEB 4.125% 3/13/26 $1 PV ON 500000.0000 SHARES DUE 3/13/2026 -----10,312.50 ---SEI 13-Mar- 26 13-Mar-26 3130AV6J 6 I 310 INTEREST EARNED ON F H L B DEB 4.500% 3/13/26 $1 PV ON 1810000.0000 SHARES DUE 3/13/2026 -----40,725.00 ---SEI 13-Mar- 26 12-Mar- 26 13-Mar-26 912797TB 3 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 3/31/26 /BMO- CHICAGO BRANCH/2,375,000 PAR VALUE AT 99.81877516 % 2,375,000.000 0 99.81 88 ----2,370,695.91 2,370,695.91 --SEI 13-Mar- 26 13-Mar- 26 13-Mar-26 3130AUU 36 P 20 MATURED PAR VALUE OF F H L B DEB 4.125% 3/13/26 500,000 PAR VALUE AT 100 % -500,000.0000 100.0 000 ---500,000.00 -499,675.00 325.00 -SEI 13-Mar- 26 13-Mar- 26 13-Mar-26 3130AV6J 6 P 20 MATURED PAR VALUE OF F H L B DEB 4.500% 3/13/26 1,810,000 PAR VALUE AT 100 % - 1,810,000.000 0 100.0 000 ---1,810,000.00 - 1,812,896.00 -2,896.00 -SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 8 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 13-Mar- 26 13-Mar- 26 13-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -9,658.4100 ----9,658.41 -9,658.41 --SEI Post Date 13-Mar-26 Total ----48,466.50 -2,571.00 -SEI 16-Mar- 26 16-Mar-26 756109AZ 7 I 310 INTEREST EARNED ON REALTY INCOME CORP 0.750% 3/15/26 $1 PV ON 542000.0000 SHARES DUE 3/15/2026 -----2,032.50 ---SEI 16-Mar- 26 16-Mar-26 3133ERHG 9 FFC4426V I 310 INTEREST EARNED ON F F C B DEB 3.71163% 9/14/26 $1 PV ON 2010000.0000 SHARES DUE 3/14/2026 -----19,065.41 ---SEI 16-Mar- 26 15-Mar- 26 15-Mar-26 756109AZ 7 P 20 MATURED PAR VALUE OF REALTY INCOME CORP 0.750% 3/15/26 542,000 PAR VALUE AT 100 % -542,000.0000 100.0 000 ---542,000.00 -541,382.12 617.88 -SEI 16-Mar- 26 16-Mar- 26 16-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 563,097.9100 -----563,097.91 563,097.91 --SEI Post Date 16-Mar-26 Total ----21,715.79 617.88 -SEI 17-Mar- 26 17-Mar-26 912797SZ 1 I 310 INTEREST EARNED ON U S TREASURY BILL 3/17/26 $1 PV ON 400000.0000 SHARES DUE 3/17/2026 400,000 PAR VALUE AT 100 % -----444.03 ---SEI 17-Mar- 26 17-Mar-26 3130ALKB 9 I 310 INTEREST EARNED ON F H L B DEB 0.750% 3/17/26 $1 PV ON 1575000.0000 SHARES DUE 3/17/2026 -----23,625.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 9 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 17-Mar- 26 10-Mar- 26 17-Mar-26 14689FAA 3 P 10 PURCHASED PAR VALUE OF CARVANA AUTO RECEIV 3.893% 3/10/27 /BNP PARIBAS SECURITIES BOND/1,250,000 PAR VALUE AT 100 % 1,250,000.000 0 100.0 000 ----1,250,000.00 1,250,000.00 --SEI 17-Mar- 26 17-Mar- 26 17-Mar-26 912797SZ 1 P 20 MATURED PAR VALUE OF U S TREASURY BILL 3/17/26 400,000 PAR VALUE AT 100 % -400,000.0000 100.0 000 ---399,555.97 -399,555.97 --SEI 17-Mar- 26 17-Mar- 26 17-Mar-26 3130ALKB 9 P 20 MATURED PAR VALUE OF F H L B DEB 0.750% 3/17/26 1,575,000 PAR VALUE AT 100 % - 1,575,000.000 0 100.0 000 ---1,575,000.00 - 1,574,370.00 630.00 -SEI 17-Mar- 26 17-Mar- 26 17-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 730,906.2500 -----730,906.25 730,906.25 --SEI 17-Mar- 26 17-Mar- 26 17-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 17,718.7500 -----17,718.75 17,718.75 --SEI Post Date 17-Mar-26 Total ----24,699.03 630.00 -SEI 18-Mar- 26 18-Mar-26 64953BBF 4 I 310 INTEREST EARNED ON NEW YORK LIFE 5.450% 9/18/26 $1 PV ON 1000000.0000 SHARES DUE 3/18/2026 -----27,250.00 ---SEI 18-Mar- 26 18-Mar-26 3135G07G 2 I 310 INTEREST EARNED ON F N M A 5.430% 6/18/26 $1 PV ON 1660000.0000 SHARES DUE 3/18/2026 -----15,654.72 ---SEI 18-Mar- 26 18-Mar- 26 18-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 27,250.0000 -----27,250.00 27,250.00 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 10 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 18-Mar- 26 18-Mar- 26 18-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 15,654.7200 -----15,654.72 15,654.72 --SEI Post Date 18-Mar-26 Total ----42,904.72 --SEI 19-Mar- 26 10-Mar- 26 19-Mar-26 03066CAA 6 AA33927 P 10 PURCHASED PAR VALUE OF AMERICREDIT AM 3.986% 3/18/27 /DEUTSCHE BANK SECURITIES, INC./1,250,000 PAR VALUE AT 100 % 1,250,000.000 0 100.0 000 ----1,250,000.00 1,250,000.00 --SEI 19-Mar- 26 19-Mar- 26 19-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 1,250,000.000 0 ----1,250,000.00 - 1,250,000.00 --SEI Post Date 19-Mar-26 Total -------SEI 23-Mar- 26 23-Mar-26 3130ALGJ 7 I 310 INTEREST EARNED ON F H L B DEB 1.000% 3/23/26 $1 PV ON 975.0000 SHARES DUE 3/23/2026 $0.00500/PV ON 195,000.00 PV DUE 3/23/26 -----975.00 ---SEI 23-Mar- 26 23-Mar- 26 23-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 195,000.0000 -----195,000.00 195,000.00 --SEI 23-Mar- 26 23-Mar- 26 23-Mar-26 3130ALGJ 7 P 20 PAID DOWN PAR VALUE OF F H L B DEB 1.000% 3/23/26 PRO RATA CALL -195,000.0000 ----195,000.00 -194,711.40 288.60 -SEI 23-Mar- 26 23-Mar- 26 23-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -297,301.8400 ----297,301.84 -297,301.84 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 11 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 23-Mar- 26 23-Mar- 26 23-Mar-26 912797TS 6 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 5/19/26 /BMO- CHICAGO BRANCH/BTEC 300,000 PAR VALUE AT 99.42561333 % 300,000.0000 99.42 56 ----298,276.84 298,276.84 --SEI Post Date 23-Mar-26 Total ----1,263.60 288.60 -SEI 24-Mar- 26 24-Mar-26 3130ALJ62 I 310 INTEREST EARNED ON F H L B DEB 0.875% 3/24/26 $1 PV ON 255000.0000 SHARES DUE 3/24/2026 -----1,115.63 ---SEI 24-Mar- 26 24-Mar-26 3133ERHS 3 FFC5426L I 310 INTEREST EARNED ON F F C B DEB 3.60978% 3/24/26 $1 PV ON 1308000.0000 SHARES DUE 3/24/2026 -----12,066.30 ---SEI 24-Mar- 26 17-Mar- 26 24-Mar-26 92868CAA 9 P 10 PURCHASED PAR VALUE OF VOLKSWAGEN AUTO 3.828% 3/22/27 /RBC CAPITAL MARKETS, LLC/1,250,000 PAR VALUE AT 100 % 1,250,000.000 0 100.0 000 ----1,250,000.00 1,250,000.00 --SEI 24-Mar- 26 24-Mar- 26 24-Mar-26 3130ALJ62 P 20 MATURED PAR VALUE OF F H L B DEB 0.875% 3/24/26 255,000 PAR VALUE AT 100 % -255,000.0000 100.0 000 ---255,000.00 -254,551.20 448.80 -SEI 24-Mar- 26 24-Mar- 26 24-Mar-26 3133ERHS 3 FFC5426L P 20 MATURED PAR VALUE OF F F C B DEB 3.60978% 3/24/26 1,308,000 PAR VALUE AT 100 % - 1,308,000.000 0 100.0 000 ---1,308,000.00 - 1,308,209.93 -209.93 -SEI 24-Mar- 26 24-Mar- 26 24-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 326,181.9300 -----326,181.93 326,181.93 --SEI Post Date 24-Mar-26 Total ----13,420.80 238.87 -SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 12 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Mar- 26 05-Mar-26 3137BRQJ 7 FHL2526E I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C MLTCL MTG 2.570% 7/25/26 ------277.51 ---SEI 25-Mar- 26 10-Mar-26 3137FMU 67 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C MLTCL MTG 2.862% 5/25/26 ------816.33 ---SEI 25-Mar- 26 25-Mar-26 3137BUX 60 FHL3426 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 3.413% 12/25/26 $1 PV ON 2817.6300 SHARES DUE 3/25/2026 $0.00284/PV ON 990,668.37 PV DUE 3/25/26 -----2,817.63 ---SEI 25-Mar- 26 25-Mar-26 3137FQXJ 7 FHL2526C I 310 INTEREST EARNED ON F H L M C MLTCL MT 2.525% 10/25/26 $1 PV ON 2104.1700 SHARES DUE 3/25/2026 $0.00210/PV ON 1,000,000.00 PV DUE 3/25/26 -----2,104.17 ---SEI 25-Mar- 26 25-Mar-26 3130ARDU 2 FHL2726D I 310 INTEREST EARNED ON F H L B DEB 2.750% 3/25/26 $1 PV ON 320000.0000 SHARES DUE 3/25/2026 -----4,400.00 ---SEI 25-Mar- 26 02-Mar- 26 05-Mar-26 3137BRQJ 7 FHL2526E P 10 PURCHASED PAR VALUE OF F H L M C MLTCL MTG 2.570% 7/25/26 /PNC BANK NA/PNC CAP MARKETS/971,821.45 PAR VALUE AT 99.44531375 % 971,821.4500 99.44 53 ----966,430.89 966,430.89 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 13 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Mar- 26 05-Mar- 26 10-Mar-26 3137FMU 67 P 10 PURCHASED PAR VALUE OF F H L M C MLTCL MTG 2.862% 5/25/26 /BMO CAPITAL MARKETS CORP/BONDS/1,140,921.5 3 PAR VALUE AT 99.63281173 % 1,140,921.530 0 99.63 28 ----1,136,732.20 1,136,732.20 --SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 3137BUX 60 FHL3426 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 3.413% 12/25/26 -2,497.4000 ----2,497.40 -2,486.57 10.83 -SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 331,819.2000 -----331,819.20 331,819.20 --SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 3130ARDU 2 FHL2726D P 20 MATURED PAR VALUE OF F H L B DEB 2.750% 3/25/26 320,000 PAR VALUE AT 100 % -320,000.0000 100.0 000 ---320,000.00 -319,730.24 269.76 -SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 222,171.4900 -----222,171.49 222,171.49 --SEI Post Date 25-Mar-26 Total ----2,326,428.42 2,334,936.97 280.59 -SEI 26-Mar- 26 26-Mar-26 3130BA2U 0 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 4.000% 3/25/27 ------111.11 ---SEI 26-Mar- 26 26-Mar-26 912797TB 3 I 310 INTEREST EARNED ON U S TREASURY BILL 3/31/26 $1 PV ON 350000.0000 SHARES DUE 3/25/2026 350,000 PAR VALUE AT 99.9502 % -----3,211.00 ---SEI 26-Mar- 26 25-Mar- 26 26-Mar-26 3130BA2U 0 P 10 PURCHASED PAR VALUE OF F H L B DEB 4.000% 3/25/27 /STONEX FINANCIAL INC./1,000,000 PAR VALUE AT 100 % 1,000,000.000 0 100.0 000 ----1,000,000.00 1,000,000.00 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 14 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 26-Mar- 26 25-Mar- 26 26-Mar-26 912797TB 3 P 20 SOLD PAR VALUE OF U S TREASURY BILL 3/31/26 /IRVTUS3N BK OF NEW YORK/350,000 PAR VALUE AT 99.9502 % -350,000.0000 99.95 02 ---346,614.70 -346,614.70 --SEI 26-Mar- 26 26-Mar- 26 26-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -650,285.4100 ----650,285.41 -650,285.41 --SEI Post Date 26-Mar-26 Total ----3,099.89 --SEI 27-Mar- 26 27-Mar-26 6944PL3B 3 PLM5926 I 310 INTEREST EARNED ON PACIFIC LIFE MTN 4.54608% 3/27/26 $1 PV ON 4025000.0000 SHARES DUE 3/27/2026 INTEREST ON MATURITY -----42,166.43 ---SEI 27-Mar- 26 27-Mar- 26 27-Mar-26 6944PL3B 3 PLM5926 P 20 MATURED PAR VALUE OF PACIFIC LIFE MTN 4.54608% 3/27/26 4,025,000 PAR VALUE AT 100 % - 4,025,000.000 0 100.0 000 ---4,025,000.00 - 4,027,864.50 -2,864.50 -SEI 27-Mar- 26 27-Mar- 26 27-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 4,025,000.000 0 -----4,025,000.00 4,025,000.00 --SEI 27-Mar- 26 27-Mar- 26 27-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 4,220,490.460 0 ----4,220,490.46 - 4,220,490.46 --SEI 27-Mar- 26 27-Mar- 26 27-Mar-26 912797UQ 8 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 7/21/26 /BMO- CHICAGO BRANCH/1,000,000 PAR VALUE AT 98.8342 % 1,000,000.000 0 98.83 42 ----988,342.00 988,342.00 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 15 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 27-Mar- 26 27-Mar- 26 27-Mar-26 912797SW 8 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 5/28/26 /CITIGROUP GLOBAL MARKETS INC./2,325,000 PAR VALUE AT 99.37776129 % 2,325,000.000 0 99.37 78 ----2,310,532.95 2,310,532.95 --SEI 27-Mar- 26 27-Mar- 26 27-Mar-26 912797UD 7 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 3/18/27 /BMO- CHICAGO BRANCH/1,000,000 PAR VALUE AT 96.378194 % 1,000,000.000 0 96.37 82 ----963,781.94 963,781.94 --SEI Post Date 27-Mar-26 Total ----39,301.93 -2,864.50 -SEI 30-Mar- 26 30-Mar-26 17325FBF 4 I 310 INTEREST EARNED ON CITIBANK N A 5.438% 4/30/26 $1 PV ON 1500000.0000 SHARES DUE 3/30/2026 -----33,987.45 ---SEI 30-Mar- 26 30-Mar-26 47816 GCW7 I 310 INTEREST EARNED ON JOHNSON JOHNSON C P 3/30/26 $1 PV ON 3400000.0000 SHARES DUE 3/30/2026 3,400,000 PAR VALUE AT 100 % -----22,906.56 ---SEI 30-Mar- 26 30-Mar-26 3130AU2G 8 I 310 INTEREST EARNED ON F H L B DEB 4.200% 3/30/26 $1 PV ON 8705000.0000 SHARES DUE 3/30/2026 -----182,805.00 ---SEI 30-Mar- 26 30-Mar-26 3130AMUX 8 I 310 INTEREST EARNED ON F H L B DEB 0.875% 3/30/26 $1 PV ON 3465000.0000 SHARES DUE 3/30/2026 -----15,159.38 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 16 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Mar- 26 30-Mar-26 3130ALPQ 1 FHL0726A I 310 INTEREST EARNED ON F H L B DEB 2.000% 3/30/26 $1 PV ON 500000.0000 SHARES DUE 3/30/2026 -----5,000.00 ---SEI 30-Mar- 26 30-Mar-26 3130AP3P 8 I 310 INTEREST EARNED ON F H L B DEB 0.750% 3/30/26 $1 PV ON 500000.0000 SHARES DUE 3/30/2026 -----1,875.00 ---SEI 30-Mar- 26 30-Mar-26 3130 ANWQ9 I 310 INTEREST EARNED ON F H L B DEB 0.875% 3/30/26 $1 PV ON 750000.0000 SHARES DUE 3/30/2026 -----3,281.25 ---SEI 30-Mar- 26 30-Mar-26 3130B0SM 2 I 310 INTEREST EARNED ON F H L B DEB 3.760% 3/30/26 $1 PV ON 1000000.0000 SHARES DUE 3/30/2026 -----9,413.33 ---SEI 30-Mar- 26 01-Apr-26 0 WIRE TRANSFER ------ 20,000,000.00 ---PIVOT 30-Mar- 26 30-Mar- 26 30-Mar-26 17325FBE 7 CNA5826 P 20 FULL CALL PAR VALUE OF CITIBANK N A 4.89738% 4/30/26 /CALLS/ - 1,608,000.000 0 100.0 000 ---1,608,000.00 - 1,609,479.36 -1,479.36 -SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 3130AP3P 8 P 20 MATURED PAR VALUE OF F H L B DEB 0.750% 3/30/26 500,000 PAR VALUE AT 100 % -500,000.0000 100.0 000 ---500,000.00 -497,074.00 2,926.00 -SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 3130 ANWQ9 P 20 MATURED PAR VALUE OF F H L B DEB 0.875% 3/30/26 750,000 PAR VALUE AT 100 % -750,000.0000 100.0 000 ---750,000.00 -744,352.50 5,647.50 -SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 17 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Mar- 26 30-Mar- 26 30-Mar-26 3130ALPQ 1 FHL0726A P 20 MATURED PAR VALUE OF F H L B DEB 2.000% 3/30/26 500,000 PAR VALUE AT 100 % -500,000.0000 100.0 000 ---500,000.00 -497,701.00 2,299.00 -SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 47816 GCW7 P 20 MATURED PAR VALUE OF JOHNSON JOHNSON C P 3/30/26 3,400,000 PAR VALUE AT 100 % - 3,400,000.000 0 100.0 000 ---3,377,093.44 - 3,377,093.44 --SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 3130B0SM 2 P 20 MATURED PAR VALUE OF F H L B DEB 3.760% 3/30/26 1,000,000 PAR VALUE AT 100 % - 1,000,000.000 0 100.0 000 ---1,000,000.00 - 1,000,252.90 -252.90 -SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 3130AU2G 8 P 20 MATURED PAR VALUE OF F H L B DEB 4.200% 3/30/26 8,705,000 PAR VALUE AT 100 % - 8,705,000.000 0 100.0 000 ---8,705,000.00 - 8,717,274.05 -12,274.05 -SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 3130AMUX 8 P 20 MATURED PAR VALUE OF F H L B DEB 0.875% 3/30/26 3,465,000 PAR VALUE AT 100 % - 3,465,000.000 0 100.0 000 ---3,465,000.00 - 3,439,462.95 25,537.05 -SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 17325FBF 4 P 20 FULL CALL PAR VALUE OF CITIBANK N A 5.438% 4/30/26 /CALLS/ - 1,500,000.000 0 100.0 000 ---1,500,000.00 - 1,506,420.00 -6,420.00 -SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 21,670,108.08 00 ----- 21,670,108.08 21,670,108.0 8 --SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 6,113,282.930 0 ----6,113,282.93 - 6,113,282.93 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 18 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-Mar- 26 30-Mar- 26 30-Mar-26 59166HG 77 P 10 PURCHASED PAR VALUE OF METLIFE SHORT TERM FDG C P 7/07/26 /BOFA SECURITIES, INC./FXD INC/285,000 PAR VALUE AT 98.94124912 % 285,000.0000 98.94 12 ----281,982.56 281,982.56 --SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 2546R3EE 0 P 10 PURCHASED PAR VALUE OF DISNEY WALT CO THE C P 5/14/26 /BOFA SECURITIES, INC./FXD INC/XOTC 368,000 PAR VALUE AT 99.5275 % 368,000.0000 99.52 75 ----366,261.20 366,261.20 --SEI 30-Mar- 26 30-Mar- 26 30-Mar-26 313385UY 0 P 10 PURCHASED PAR VALUE OF F H L B DISC NTS 3/31/26 /WELLS FARGO SECURITIES, LLC/5,475,000 PAR VALUE AT 99.99 % 5,475,000.000 0 99.99 00 ----5,474,452.50 5,474,452.50 --SEI Post Date 30-Mar-26 Total ---- 20,000,000.00 290,411.21 15,983.24 -PIVOT 31-Mar- 26 31-Mar-26 756109BF 0 I 300 PAID ACCRUED INTEREST ON PURCHASE OF REALTY INCOME CORP 4.875% 6/01/26 ------4,501.25 ---SEI 31-Mar- 26 31-Mar-26 756109BF 0 I 300 PAID ACCRUED INTEREST ON PURCHASE OF REALTY INCOME CORP 4.875% 6/01/26 ------4,062.50 ---SEI 31-Mar- 26 31-Mar-26 313385UY 0 I 310 INTEREST EARNED ON F H L B DISC NTS 3/31/26 $1 PV ON 5475000.0000 SHARES DUE 3/31/2026 5,475,000 PAR VALUE AT 100 % -----547.50 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 19 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 31-Mar- 26 31-Mar-26 912797TB 3 I 310 INTEREST EARNED ON U S TREASURY BILL 3/31/26 $1 PV ON 8525000.0000 SHARES DUE 3/31/2026 8,525,000 PAR VALUE AT 100 % -----58,562.09 ---SEI 31-Mar- 26 31-Mar-26 17325FBE 7 CNA5826 I 310 INTEREST EARNED ON CITIBANK N A 4.89738% 4/30/26 $1 PV ON 1608000.0000 SHARES DUE 3/30/2026 3/30 FULL CALL INTEREST ADJUSTMENT -----11,222.77 ---SEI 31-Mar- 26 31-Mar-26 75884RAV 5 I 300 PAID ACCRUED INTEREST ON PURCHASE OF REGENCY CENTERS LP 3.600% 2/01/27 ------10,800.00 ---SEI 31-Mar- 26 30-Mar- 26 31-Mar-26 3136GCY 66 P 10 PURCHASED PAR VALUE OF FEDERAL NATL MTG AS 4.000% 3/30/27 /STONEX FINANCIAL INC./1,000,000 PAR VALUE AT 100 % 1,000,000.000 0 100.0 000 ----1,000,000.00 1,000,000.00 --SEI 31-Mar- 26 30-Mar- 26 31-Mar-26 756109BF 0 P 10 PURCHASED PAR VALUE OF REALTY INCOME CORP 4.875% 6/01/26 /RBC CAPITAL MARKETS, LLC/250,000 PAR VALUE AT 100.011 % 250,000.0000 100.0 110 ----250,027.50 250,027.50 --SEI 31-Mar- 26 30-Mar- 26 31-Mar-26 912797UR 6 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 7/28/26 /BMO- CHICAGO BRANCH/2,000,000 PAR VALUE AT 98.8060335 % 2,000,000.000 0 98.80 60 ----1,976,120.67 1,976,120.67 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 20 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 31-Mar- 26 30-Mar- 26 31-Mar-26 756109BF 0 P 10 PURCHASED PAR VALUE OF REALTY INCOME CORP 4.875% 6/01/26 /MORGAN STANLEY & CO. LLC/277,000 PAR VALUE AT 100.011 % 277,000.0000 100.0 110 ----277,030.47 277,030.47 --SEI 31-Mar- 26 30-Mar- 26 31-Mar-26 313385UZ 7 P 10 PURCHASED PAR VALUE OF F H L B DISC NTS 4/01/26 /WELLS FARGO SECURITIES, LLC/4,800,000 PAR VALUE AT 99.99 % 4,800,000.000 0 99.99 00 ----4,799,520.00 4,799,520.00 --SEI 31-Mar- 26 30-Mar- 26 31-Mar-26 912797TT4 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 5/26/26 /J.P. MORGAN SECURITIES LLC/2,000,000 PAR VALUE AT 99.4365 % 2,000,000.000 0 99.43 65 ----1,988,730.00 1,988,730.00 --SEI 31-Mar- 26 31-Mar- 26 31-Mar-26 313385UY 0 P 20 MATURED PAR VALUE OF F H L B DISC NTS 3/31/26 5,475,000 PAR VALUE AT 100 % - 5,475,000.000 0 100.0 000 ---5,474,452.50 - 5,474,452.50 --SEI 31-Mar- 26 31-Mar- 26 31-Mar-26 912797TB 3 P 20 MATURED PAR VALUE OF U S TREASURY BILL 3/31/26 8,525,000 PAR VALUE AT 100 % - 8,525,000.000 0 100.0 000 ---8,466,437.91 - 8,466,437.91 --SEI 31-Mar- 26 31-Mar- 26 31-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,700,007.610 0 -----3,700,007.61 3,700,007.61 --SEI 31-Mar- 26 31-Mar- 26 31-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 4,128,017.570 0 ----4,128,017.57 - 4,128,017.57 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 21 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 31-Mar- 26 31-Mar- 26 31-Mar-26 912833LZ1 51526 P 10 PURCHASED PAR VALUE OF U S TREAS BD STRIP 5/15/26 /MORGAN STANLEY & CO. LLC/1,000,000 PAR VALUE AT 99.541 % 1,000,000.000 0 99.54 10 ----995,410.00 995,410.00 --SEI 31-Mar- 26 31-Mar- 26 31-Mar-26 912797SW 8 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 5/28/26 /J.P. MORGAN SECURITIES LLC/900,000 PAR VALUE AT 99.41573111 % 900,000.0000 99.41 57 ----894,741.58 894,741.58 --SEI 31-Mar- 26 31-Mar- 26 31-Mar-26 912797SW 8 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 5/28/26 /NMRIUS33 NOMURA SECS INTL NY/450,000 PAR VALUE AT 99.41750222 % 450,000.0000 99.41 75 ----447,378.76 447,378.76 --SEI 31-Mar- 26 31-Mar- 26 31-Mar-26 75884RAV 5 P 10 PURCHASED PAR VALUE OF REGENCY CENTERS LP 3.600% 2/01/27 /BOFA SECURITIES, INC./FXD INC/1,800,000 PAR VALUE AT 99.495 % 1,800,000.000 0 99.49 50 ----1,790,910.00 1,790,910.00 --SEI Post Date 31-Mar-26 Total ----50,968.61 --SEI Account 6745046600 Total ---- 20,000,000.00 668,980.31 28,713.83 -SEI Account Ending Cash Principal Cash: - 26,531,758.30 Income Cash: 26,531,758.30 Total Cash: - TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 22 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Account Beginning Cash Principal Cash: - 115,429,130.20 Income Cash: 115,429,130.20 Total Cash: - 02-Mar- 26 02-Mar-26 91282 CHW4 I 310 INTEREST EARNED ON U S TREASURY NT 4.125% 8/31/30 $1 PV ON 12350000.0000 SHARES DUE 2/28/2026 -----254,718.75 ---SEI 02-Mar- 26 02-Mar-26 91282CFJ 5 I 310 INTEREST EARNED ON U S TREASURY NT 3.125% 8/31/29 $1 PV ON 27475000.0000 SHARES DUE 2/28/2026 -----429,296.88 ---SEI 02-Mar- 26 02-Mar-26 91282CJQ 5 I 300 PAID ACCRUED INTEREST ON PURCHASE OF U S TREASURY NT 3.750% 12/31/30 ------101,894.85 ---SEI 02-Mar- 26 02-Mar-26 91282CKD 2 I 310 INTEREST EARNED ON U S TREASURY NT 4.250% 2/28/29 $1 PV ON 3300000.0000 SHARES DUE 2/28/2026 -----70,125.00 ---SEI 02-Mar- 26 02-Mar-26 91282CJR 3 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 3.750% 12/31/28 -----82,937.67 ---SEI 02-Mar- 26 02-Mar-26 91282CCV 1 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 1.125% 8/31/28 -----137.57 ---SEI 02-Mar- 26 02-Mar-26 91282CCV 1 I 310 INTEREST EARNED ON U S TREASURY NT 1.125% 8/31/28 $1 PV ON 2250000.0000 SHARES DUE 2/28/2026 -----12,656.25 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 23 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 02-Mar- 26 02-Mar-26 31846V567 FGZXX I 310 INTEREST EARNED ON FIRST AM GOVT OB FD CL Z UNIT ON 0.0000 SHARES DUE 2/28/2026 INTEREST FROM 2/1/26 TO 2/28/26 -----4,684.17 ---SEI 02-Mar- 26 27-Feb- 26 02-Mar-26 91282CJQ 5 P 10 PURCHASED PAR VALUE OF U S TREASURY NT 3.750% 12/31/30 /BARCLAYS CAPITAL INC. FIXED IN/BTEC 16,125,000 PAR VALUE AT 101.00781253 % 16,125,000.00 00 101.0 078 ---- 16,287,509.77 16,287,509.7 7 --SEI 02-Mar- 26 27-Feb- 26 02-Mar-26 91282CJR 3 P 20 SOLD PAR VALUE OF U S TREASURY NT 3.750% 12/31/28 /SGSCUS33DOM SG AMERICAS SEC LL/13,125,000 PAR VALUE AT 100.98046872 % - 13,125,000.00 00 100.9 805 ---13,253,686.52 - 12,872,915.0 4 -380,771. 48 SEI 02-Mar- 26 27-Feb- 26 02-Mar-26 91282CCV 1 P 20 SOLD PAR VALUE OF U S TREASURY NT 1.125% 8/31/28 /SGSCUS33DOM SG AMERICAS SEC LL/2,250,000 PAR VALUE AT 94.65200889 % - 2,250,000.000 0 94.65 20 ---2,129,670.20 - 2,114,912.11 14,758.09 -SEI 02-Mar- 26 02-Mar- 26 02-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -168,832.0300 ----168,832.03 -168,832.03 --SEI 02-Mar- 26 02-Mar- 26 02-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -412,300.7900 ----412,300.79 -412,300.79 --SEI 02-Mar- 26 02-Mar- 26 02-Mar-26 30229BC 39 P 10 PURCHASED PAR VALUE OF EXXON MOBIL CORP DISC C P 3/03/26 /J.P. MORGAN SECURITIES LLC/425,000 PAR VALUE AT 99.98989176 % 425,000.0000 99.98 99 ----424,957.04 424,957.04 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 24 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Post Date 02-Mar-26 Total ---4,684.17 1,143,506.84 14,758.09 380,771. 48 SEI 03-Mar- 26 03-Mar-26 30229BC 39 I 310 INTEREST EARNED ON EXXON MOBIL CORP DISC C P 3/03/26 $1 PV ON 425000.0000 SHARES DUE 3/3/2026 425,000 PAR VALUE AT 100 % -----42.96 ---SEI 03-Mar- 26 03-Mar- 26 03-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 429,684.1700 -----429,684.17 429,684.17 --SEI 03-Mar- 26 03-Mar- 26 03-Mar-26 30229BC 39 P 20 MATURED PAR VALUE OF EXXON MOBIL CORP DISC C P 3/03/26 425,000 PAR VALUE AT 100 % -425,000.0000 100.0 000 ---424,957.04 -424,957.04 --SEI Post Date 03-Mar-26 Total ----4,684.17 4,727.13 --SEI 05-Mar- 26 05-Mar-26 3133ER5D 9 I 310 INTEREST EARNED ON F F C B DEB 4.490% 3/05/29 $1 PV ON 12975000.0000 SHARES DUE 3/5/2026 -----291,288.75 ---SEI 05-Mar- 26 05-Mar-26 06051GHG 7 I 310 INTEREST EARNED ON BANK OF AMERICA MTN 3.970% 3/05/29 $1 PV ON 4500000.0000 SHARES DUE 3/5/2026 -----89,325.00 ---SEI 05-Mar- 26 05-Mar- 26 05-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 380,613.7500 -----380,613.75 380,613.75 --SEI Post Date 05-Mar-26 Total ----380,613.75 --SEI 09-Mar- 26 09-Mar-26 91282 CDW8 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 1.750% 1/31/29 -----3,577.35 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 25 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 09-Mar- 26 09-Mar-26 91282CJN 2 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 4.375% 11/30/28 -----102,926.68 ---SEI 09-Mar- 26 06-Mar- 26 09-Mar-26 91282 CDW8 P 20 SOLD PAR VALUE OF U S TREASURY NT 1.750% 1/31/29 /BOFA SECURITIES, INC./FXD INC/2,000,000 PAR VALUE AT 95.003571 % - 2,000,000.000 0 95.00 36 ---1,900,071.42 - 1,754,921.88 -145,149. 54 SEI 09-Mar- 26 06-Mar- 26 09-Mar-26 91282CJN 2 P 20 SOLD PAR VALUE OF U S TREASURY NT 4.375% 11/30/28 /IRVTUS3N BK OF NEW YORK/8,650,000 PAR VALUE AT 102.0738837 % - 8,650,000.000 0 102.0 739 ---8,829,390.94 - 8,854,789.06 -- 25,398.1 2 SEI 09-Mar- 26 09-Mar- 26 09-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 4,283,291.660 0 -----4,283,291.66 4,283,291.66 --SEI Post Date 09-Mar-26 Total ---6,552,674.73 - 6,326,419.28 -119,751. 42 SEI 10-Mar- 26 05-Mar- 26 10-Mar-26 24422EYL 7 P 10 PURCHASED PAR VALUE OF JOHN DEERE MTN 4.200% 3/10/31 /BOFA SECURITIES, INC./FXD INC/1,891,000 PAR VALUE AT 100.094 % 1,891,000.000 0 100.0 940 ----1,892,777.54 1,892,777.54 --SEI 10-Mar- 26 05-Mar- 26 10-Mar-26 24422EYL 7 P 10 PURCHASED PAR VALUE OF JOHN DEERE MTN 4.200% 3/10/31 /CITIGROUP GLOBAL MARKETS INC./2,909,000 PAR VALUE AT 99.978 % 2,909,000.000 0 99.97 80 ----2,908,360.02 2,908,360.02 --SEI 10-Mar- 26 10-Mar- 26 10-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 4,801,137.560 0 ----4,801,137.56 - 4,801,137.56 --SEI Post Date 10-Mar-26 Total -------SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 26 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 13-Mar- 26 13-Mar-26 91282 CDW8 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 1.750% 1/31/29 -----3,171.27 ---SEI 13-Mar- 26 13-Mar-26 91282CKD 2 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 4.250% 2/28/29 -----4,954.48 ---SEI 13-Mar- 26 10-Mar- 26 13-Mar-26 023135DD 5 P 10 PURCHASED PAR VALUE OF AMAZON COM INC 4.250% 3/13/31 /J.P. MORGAN SECURITIES LLC/4,900,000 PAR VALUE AT 99.84 % 4,900,000.000 0 99.84 00 ----4,892,160.00 4,892,160.00 --SEI 13-Mar- 26 12-Mar- 26 13-Mar-26 91282CKD 2 P 20 SOLD PAR VALUE OF U S TREASURY NT 4.250% 2/28/29 /IRVTUS3N BK OF NEW YORK/3,300,000 PAR VALUE AT 101.36685242 % - 3,300,000.000 0 101.3 669 ---3,345,106.13 - 3,329,272.77 -15,833.3 6 SEI 13-Mar- 26 12-Mar- 26 13-Mar-26 91282 CDW8 P 20 SOLD PAR VALUE OF U S TREASURY NT 1.750% 1/31/29 /IRVTUS3N BK OF NEW YORK/1,600,000 PAR VALUE AT 94.54654 % - 1,600,000.000 0 94.54 65 ---1,512,744.64 - 1,403,937.50 -108,807. 14 SEI 13-Mar- 26 13-Mar- 26 13-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -26,183.4800 ----26,183.48 -26,183.48 --SEI Post Date 13-Mar-26 Total ----132,766.25 -124,640. 50 SEI 16-Mar- 26 16-Mar-26 02582JKM 1 AE44529 I 310 INTEREST EARNED ON AMERICAN EXP 4.560% 12/17/29 $1 PV ON 40416.8000 SHARES DUE 3/15/2026 $0.00380/PV ON 10,636,000.00 PV DUE 3/15/26 -----40,416.80 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 27 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 16-Mar- 26 16-Mar-26 12674BAB 1 CE44328 I 310 INTEREST EARNED ON CNH EQUIPMENT 4.300% 8/15/28 $1 PV ON 7055.1800 SHARES DUE 3/15/2026 $0.00358/PV ON 1,968,887.29 PV DUE 3/15/26 -----7,055.18 ---SEI 16-Mar- 26 16-Mar-26 14043KAK 1 I 310 INTEREST EARNED ON CAPITAL ONE PRIME 4.760% 8/15/28 $1 PV ON 20785.3400 SHARES DUE 3/15/2026 $0.00397/PV ON 5,240,000.00 PV DUE 3/15/26 -----20,785.34 ---SEI 16-Mar- 26 16-Mar-26 161571HV 9 I 310 INTEREST EARNED ON CHASE ISSUE TR 4.600% 1/16/29 $1 PV ON 30820.0000 SHARES DUE 3/15/2026 $0.00383/PV ON 8,040,000.00 PV DUE 3/15/26 -----30,820.00 ---SEI 16-Mar- 26 16-Mar-26 34528QHV 9 I 310 INTEREST EARNED ON FORD CR FLP MASTER 0.00001% 5/15/28 $1 PV ON 36900.0000 SHARES DUE 3/15/2026 $0.00410/PV ON 9,000,000.00 PV DUE 3/15/26 -----36,900.00 ---SEI 16-Mar- 26 16-Mar-26 47800AAC 4 JDO6827 I 310 INTEREST EARNED ON JOHN DEERE OWNR TR 3.73999% 2/16/27 $1 PV ON 307.4200 SHARES DUE 3/15/2026 $0.00312/PV ON 98,638.35 PV DUE 3/15/26 -----307.42 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 28 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 16-Mar- 26 16-Mar-26 43816DAC 9 I 310 INTEREST EARNED ON HONDA AUTO 4.330% 3/15/29 $1 PV ON 7119.2400 SHARES DUE 3/15/2026 $0.00361/PV ON 1,973,000.00 PV DUE 3/15/26 -----7,119.24 ---SEI 16-Mar- 26 16-Mar-26 47800BAC 2 JDO5027 I 310 INTEREST EARNED ON JOHN DEERE OWNER 5.090% 6/15/27 $1 PV ON 2358.1200 SHARES DUE 3/15/2026 $0.00424/PV ON 555,940.65 PV DUE 3/15/26 -----2,358.12 ---SEI 16-Mar- 26 16-Mar-26 361886DK 7 I 310 INTEREST EARNED ON GMF FLOORPL OWNE 4.680% 11/15/28 $1 PV ON 30069.0000 SHARES DUE 3/15/2026 $0.00390/PV ON 7,710,000.00 PV DUE 3/15/26 -----30,069.00 ---SEI 16-Mar- 26 16-Mar-26 47800DAD 6 I 310 INTEREST EARNED ON JOHN DEERE OWNER TR 4.830% 9/17/29 $1 PV ON 10737.1500 SHARES DUE 3/15/2026 $0.00353/PV ON 3,046,000.00 PV DUE 3/15/26 -----10,737.15 ---SEI 16-Mar- 26 16-Mar-26 345282AD 9 I 310 INTEREST EARNED ON FORD CREDIT AT 4.940% 6/15/28 $1 PV ON 18887.8700 SHARES DUE 3/15/2026 $0.00393/PV ON 4,802,000.00 PV DUE 3/15/26 -----18,887.87 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 29 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 16-Mar- 26 16-Mar-26 44935CAD 3 I 310 INTEREST EARNED ON HYUNDAI AUTO RECV TR 4.790% 10/15/29 $1 PV ON 15231.6000 SHARES DUE 3/15/2026 $0.00360/PV ON 4,231,000.00 PV DUE 3/15/26 -----15,231.60 ---SEI 16-Mar- 26 16-Mar-26 448984AD 6 I 310 INTEREST EARNED ON HYUNDAI AUTO LEASE 4.620% 4/17/28 $1 PV ON 19250.0000 SHARES DUE 3/15/2026 $0.00385/PV ON 5,000,000.00 PV DUE 3/15/26 -----19,250.00 ---SEI 16-Mar- 26 16-Mar-26 58773DAD 6 I 310 INTEREST EARNED ON MERCEDES BENZ 4.780% 12/17/29 $1 PV ON 18960.6700 SHARES DUE 3/15/2026 $0.00398/PV ON 4,760,000.00 PV DUE 3/15/26 -----18,960.67 ---SEI 16-Mar- 26 16-Mar-26 92887TAC 5 I 310 INTEREST EARNED ON VOLVO FINANCIAL 4.460% 5/15/29 $1 PV ON 7619.1600 SHARES DUE 3/15/2026 $0.00372/PV ON 2,050,000.00 PV DUE 3/15/26 -----7,619.16 ---SEI 16-Mar- 26 16-Mar-26 31348SWZ 3 786064F I 310 INTEREST EARNED ON F H L M C #786064 5.762% 1/01/28 $1 PV ON 0.8500 SHARES DUE 3/15/2026 JANUARY FHLMC DUE 3/15/26 -----0.85 ---SEI 16-Mar- 26 16-Mar-26 95040QAH 7 I 310 INTEREST EARNED ON WELLTOWER INC 4.125% 3/15/29 $1 PV ON 3845000.0000 SHARES DUE 3/15/2026 -----79,303.13 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 30 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 16-Mar- 26 16-Mar-26 58989V2D 5 I 310 INTEREST EARNED ON MET TOWER MTN 1.250% 9/14/26 $1 PV ON 3745000.0000 SHARES DUE 3/14/2026 -----23,406.25 ---SEI 16-Mar- 26 16-Mar-26 706916AC 7 I 310 INTEREST EARNED ON PENFED AUTO REC 4.650% 7/15/30 $1 PV ON 7401.7700 SHARES DUE 3/15/2026 $0.00336/PV ON 2,204,000.00 PV DUE 3/15/26 -----7,401.77 ---SEI 16-Mar- 26 16-Mar-26 50118HAC 0 KCO2530 I 310 INTEREST EARNED ON KUBOTA CR OWNER TR 2.580% 5/15/30 $1 PV ON 3328.2000 SHARES DUE 3/15/2026 $0.00215/PV ON 1,548,000.00 PV DUE 3/15/26 -----3,328.20 ---SEI 16-Mar- 26 16-Mar-26 3133TCE 95 FHL3032 I 310 INTEREST EARNED ON F H L M C MLTCL MT 4.572% 8/15/32 $1 PV ON 4.1600 SHARES DUE 3/15/2026 $0.00381/PV ON 1,061.50 PV DUE 3/15/26 -----4.16 ---SEI 16-Mar- 26 15-Mar- 26 16-Mar-26 12674BAB 1 CE44328 P 20 PAID DOWN PAR VALUE OF CNH EQUIPMENT 4.300% 8/15/28 -199,134.6900 ----199,134.69 -199,130.19 -4.50 SEI 16-Mar- 26 15-Mar- 26 16-Mar-26 47800BAC 2 JDO5027 P 20 PAID DOWN PAR VALUE OF JOHN DEERE OWNER 5.090% 6/15/27 -125,703.2700 ----125,703.27 -125,693.51 -9.76 SEI 16-Mar- 26 15-Mar- 26 16-Mar-26 47800AAC 4 JDO6827 P 20 PAID DOWN PAR VALUE OF JOHN DEERE OWNR TR 3.73999% 2/16/27 -96,767.5500 ----96,767.55 -96,758.31 -9.24 SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 31 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 16-Mar- 26 15-Mar- 26 16-Mar-26 31348SWZ 3 786064F P 20 PAID DOWN PAR VALUE OF F H L M C #786064 5.762% 1/01/28 FEBRUARY FHLMC DUE 3/15/26 -9.5600 ----9.56 -9.33 -0.23 SEI 16-Mar- 26 15-Mar- 26 16-Mar-26 3133TCE 95 FHL3032 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 4.572% 8/15/32 -29.6500 ----29.65 -29.68 --0.03 SEI 16-Mar- 26 16-Mar- 26 16-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 790,842.8500 -----790,842.85 790,842.85 --SEI 16-Mar- 26 16-Mar- 26 16-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 10,763.7800 -----10,763.78 10,763.78 --SEI Post Date 16-Mar-26 Total ----379,985.61 -23.70 SEI 17-Mar- 26 17-Mar-26 76116EHL 7 I 310 INTEREST EARNED ON RESOLUTION FDG STRIP 10/15/28 $1 PV ON 7500000.0000 SHARES DUE 3/16/2026 7,500,000 PAR VALUE AT 90.695 % -----424,950.00 ---SEI 17-Mar- 26 16-Mar- 26 17-Mar-26 76116EHL 7 P 20 SOLD PAR VALUE OF RESOLUTION FDG STRIP 10/15/28 /WELLS FARGO SECURITIES, LLC/7,500,000 PAR VALUE AT 90.695 % - 7,500,000.000 0 90.69 50 ---6,377,175.00 - 6,377,175.00 --SEI 17-Mar- 26 17-Mar- 26 17-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 6,802,125.000 0 -----6,802,125.00 6,802,125.00 --SEI Post Date 17-Mar-26 Total ----424,950.00 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 32 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 18-Mar- 26 10-Mar- 26 18-Mar-26 47787DAD 3 P 10 PURCHASED PAR VALUE OF JOHN DEERE OWNER 3.870% 8/15/30 /RBC CAPITAL MARKETS, LLC/1,105,000 PAR VALUE AT 99.98227964 % 1,105,000.000 0 99.98 23 ----1,104,804.19 1,104,804.19 --SEI 18-Mar- 26 18-Mar- 26 18-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 1,104,804.190 0 ----1,104,804.19 - 1,104,804.19 --SEI Post Date 18-Mar-26 Total -------SEI 20-Mar- 26 20-Mar-26 36273VAD 7 I 310 INTEREST EARNED ON GM FINL AM LS TR 3.880% 1/22/29 $1 PV ON 5660.0600 SHARES DUE 3/20/2026 $0.00410/PV ON 1,382,000.00 PV DUE 3/20/26 -----5,660.06 ---SEI 20-Mar- 26 20-Mar-26 36225DCB 8 080965M I 310 INTEREST EARNED ON G N M A I I #080965 5.375% 7/20/34 $1 PV ON 51.3800 SHARES DUE 3/20/2026 FEBRUARY GNMA DUE 3/20/26 -----51.38 ---SEI 20-Mar- 26 20-Mar-26 36225CC 20 080088M I 310 INTEREST EARNED ON G N M A I I #080088 5.625% 6/20/27 $1 PV ON 5.8100 SHARES DUE 3/20/2026 FEBRUARY GNMA DUE 3/20/26 -----5.81 ---SEI 20-Mar- 26 20-Mar-26 36225CN 28 080408M I 310 INTEREST EARNED ON G N M A I I #080408 5.625% 5/20/30 $1 PV ON 52.9000 SHARES DUE 3/20/2026 FEBRUARY GNMA DUE 3/20/26 -----52.90 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 33 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 20-Mar- 26 20-Mar-26 36225CNM 4 080395M I 310 INTEREST EARNED ON G N M A I I #080395 5.625% 4/20/30 $1 PV ON 6.0600 SHARES DUE 3/20/2026 FEBRUARY GNMA DUE 3/20/26 -----6.06 ---SEI 20-Mar- 26 20-Mar-26 36225CAZ 9 080023M I 310 INTEREST EARNED ON G N M A I I #080023 5.125% 12/20/26 $1 PV ON 3.0300 SHARES DUE 3/20/2026 FEBRUARY GNMA DUE 3/20/26 -----3.03 ---SEI 20-Mar- 26 20-Mar-26 89239NAD 7 I 310 INTEREST EARNED ON TOYOTA LEASE OWNER 4.750% 2/22/28 $1 PV ON 4378000.0000 SHARES DUE 3/20/2026 -----17,329.58 ---SEI 20-Mar- 26 20-Mar-26 92348KDY 6 I 310 INTEREST EARNED ON VERIZON MASTER TRUST 4.510% 3/20/30 $1 PV ON 7731000.0000 SHARES DUE 3/20/2026 -----29,055.67 ---SEI 20-Mar- 26 12-Mar- 26 20-Mar-26 87269AAA 8 P 10 PURCHASED PAR VALUE OF T MOBILE US 4.250% 10/21/30 /RBC CAPITAL MARKETS, LLC/6,762,000 PAR VALUE AT 99.97877995 % 6,762,000.000 0 99.97 88 ----6,760,565.10 6,760,565.10 --SEI 20-Mar- 26 20-Mar- 26 20-Mar-26 36225CAZ 9 080023M P 20 PAID DOWN PAR VALUE OF G N M A I I #080023 5.125% 12/20/26 FEBRUARY GNMA DUE 3/20/26 -128.6500 ----128.65 -130.78 --2.13 SEI 20-Mar- 26 20-Mar- 26 20-Mar-26 36225CC 20 080088M P 20 PAID DOWN PAR VALUE OF G N M A I I #080088 5.625% 6/20/27 FEBRUARY GNMA DUE 3/20/26 -78.7600 ----78.76 -80.48 --1.72 SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 34 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 20-Mar- 26 20-Mar- 26 20-Mar-26 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 6,754,245.140 0 ----6,754,245.14 - 6,754,245.14 --SEI 20-Mar- 26 20-Mar- 26 20-Mar-26 36225CN 28 080408M P 20 PAID DOWN PAR VALUE OF G N M A I I #080408 5.625% 5/20/30 FEBRUARY GNMA DUE 3/20/26 -197.0200 ----197.02 -195.02 -2.00 SEI 20-Mar- 26 20-Mar- 26 20-Mar-26 36225DCB 8 080965M P 20 PAID DOWN PAR VALUE OF G N M A I I #080965 5.375% 7/20/34 FEBRUARY GNMA DUE 3/20/26 -103.0500 ----103.05 -102.99 -0.06 SEI 20-Mar- 26 20-Mar- 26 20-Mar-26 36225CNM 4 080395M P 20 PAID DOWN PAR VALUE OF G N M A I I #080395 5.625% 4/20/30 FEBRUARY GNMA DUE 3/20/26 -33.2400 ----33.24 -32.94 -0.30 SEI 20-Mar- 26 20-Mar- 26 20-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 46,385.2500 -----46,385.25 46,385.25 --SEI Post Date 20-Mar-26 Total ----52,163.00 --1.49 SEI 23-Mar- 26 09-Mar-26 3137HPM 75 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C MLTCL MTG 4.250% 1/15/31 ------6,040.37 ---SEI 23-Mar- 26 23-Mar-26 91282CGS 4 UST0030 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 3.625% 3/31/30 -----117,832.42 ---SEI 23-Mar- 26 04-Mar- 26 09-Mar-26 3137HPM 75 P 10 PURCHASED PAR VALUE OF F H L M C MLTCL MTG 4.250% 1/15/31 /NETHGB21 BMO CAP MKTS LONDON/REVS REPOST FACTOR ADJ 6,395,680.950 0 -----6,411,670.15 6,411,670.15 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 35 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 23-Mar- 26 20-Mar- 26 23-Mar-26 91282CGS 4 UST0030 P 20 SOLD PAR VALUE OF U S TREASURY NT 3.625% 3/31/30 /BARCLAYS CAPITAL INC. FIXED IN/6,800,000 PAR VALUE AT 98.675781 % - 6,800,000.000 0 98.67 58 ---6,709,953.13 - 6,697,757.16 12,195.97 -SEI 23-Mar- 26 23-Mar- 26 23-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 6,827,785.550 0 -----6,827,785.55 6,827,785.55 --SEI 23-Mar- 26 23-Mar- 26 23-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 134,964.2100 -----134,964.21 134,964.21 --SEI Post Date 23-Mar-26 Total ----6,552,674.73 6,676,662.75 12,195.97 -SEI 25-Mar- 26 25-Mar-26 05592XAD 2 BVO5428 I 310 INTEREST EARNED ON BMW VEH OWNER TR 5.470% 2/25/28 $1 PV ON 2123.6500 SHARES DUE 3/25/2026 $0.00456/PV ON 465,883.28 PV DUE 3/25/26 -----2,123.65 ---SEI 25-Mar- 26 25-Mar-26 3136AJZP 4 I 310 INTEREST EARNED ON F N M A GTD REMIC 1.500% 4/25/29 $1 PV ON 660.1600 SHARES DUE 3/25/2026 $0.00125/PV ON 528,123.12 PV DUE 3/25/26 -----660.16 ---SEI 25-Mar- 26 25-Mar-26 3137FETN 0 FHL0428B I 310 INTEREST EARNED ON F H L M C MLTCL MT 3.350% 1/25/28 $1 PV ON 23561.6600 SHARES DUE 3/25/2026 $0.00279/PV ON 8,440,000.00 PV DUE 3/25/26 -----23,561.66 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 36 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Mar- 26 25-Mar-26 3137FG6X 8 FHL3828B I 310 INTEREST EARNED ON F H L M C MLTCL MT 3.850% 5/25/28 $1 PV ON 23260.4100 SHARES DUE 3/25/2026 $0.00321/PV ON 7,250,000.00 PV DUE 3/25/26 -----23,260.41 ---SEI 25-Mar- 26 25-Mar-26 31397QRE 0 FNM2841 I 310 INTEREST EARNED ON F N M A GTD REMIC 2.472% 2/25/41 $1 PV ON 191.4100 SHARES DUE 3/25/2026 $0.00372/PV ON 51,481.23 PV DUE 3/25/26 -----191.41 ---SEI 25-Mar- 26 25-Mar-26 3137HB3D 4 FHL5028 I 310 INTEREST EARNED ON F H L M C MLTCL 5.069% 10/25/28 $1 PV ON 45266.1700 SHARES DUE 3/25/2026 $0.00422/PV ON 10,716,000.00 PV DUE 3/25/26 -----45,266.17 ---SEI 25-Mar- 26 25-Mar-26 3137HDJJ 0 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 4.803% 5/25/29 $1 PV ON 35079.0400 SHARES DUE 3/25/2026 $0.00400/PV ON 8,764,283.43 PV DUE 3/25/26 -----35,079.04 ---SEI 25-Mar- 26 25-Mar-26 3137HCKV 3 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 5.180% 3/25/29 $1 PV ON 27281.3300 SHARES DUE 3/25/2026 $0.00432/PV ON 6,320,000.00 PV DUE 3/25/26 -----27,281.33 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 37 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Mar- 26 25-Mar-26 31394JY35 FHL9543 I 310 INTEREST EARNED ON F H L M C MLTCL MT 6.49999% 9/25/43 $1 PV ON 1387.3500 SHARES DUE 3/25/2026 $0.00542/PV ON 256,125.92 PV DUE 3/25/26 -----1,387.35 ---SEI 25-Mar- 26 25-Mar-26 3137HBPD 0 FHL5429 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 5.400% 1/25/29 $1 PV ON 45000.0000 SHARES DUE 3/25/2026 $0.00450/PV ON 10,000,000.00 PV DUE 3/25/26 -----45,000.00 ---SEI 25-Mar- 26 25-Mar-26 31406PQY 8 815971A I 310 INTEREST EARNED ON F N M A #815971 5.000% 3/01/35 $1 PV ON 137.6200 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----137.62 ---SEI 25-Mar- 26 25-Mar-26 31403GXF 4 748678A I 310 INTEREST EARNED ON F N M A #748678 5.000% 10/01/33 $1 PV ON 1.5500 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----1.55 ---SEI 25-Mar- 26 25-Mar-26 31371NUC 7 257179A I 310 INTEREST EARNED ON F N M A #257179 4.500% 4/01/28 $1 PV ON 4.2100 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----4.21 ---SEI 25-Mar- 26 25-Mar-26 31410F4V 4 888336A I 310 INTEREST EARNED ON F N M A #888336 5.000% 7/01/36 $1 PV ON 179.7200 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----179.72 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 38 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Mar- 26 25-Mar-26 31407BXH 7 826080A I 310 INTEREST EARNED ON F N M A #826080 5.000% 7/01/35 $1 PV ON 21.2300 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----21.23 ---SEI 25-Mar- 26 25-Mar-26 31403DJZ 3 745580A I 310 INTEREST EARNED ON F N M A #745580 5.000% 6/01/36 $1 PV ON 108.7300 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----108.73 ---SEI 25-Mar- 26 25-Mar-26 3138EG6F 6 AL0869A I 310 INTEREST EARNED ON F N M A #AL0869 4.500% 6/01/29 $1 PV ON 4.4700 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----4.47 ---SEI 25-Mar- 26 25-Mar-26 31417YAY 3 MA0022A I 310 INTEREST EARNED ON F N M A #MA0022 4.500% 4/01/29 $1 PV ON 7.3200 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----7.32 ---SEI 25-Mar- 26 25-Mar-26 31376KT 22 357969A I 310 INTEREST EARNED ON F N M A #357969 5.000% 9/01/35 $1 PV ON 116.6400 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----116.64 ---SEI 25-Mar- 26 25-Mar-26 3140XQTZ 0 FS8667A I 310 INTEREST EARNED ON F N M A #FS8667 3.000% 10/01/30 $1 PV ON 9100.8300 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----9,100.83 ---SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 39 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Mar- 26 25-Mar-26 31406XWT 5 823358A I 310 INTEREST EARNED ON F N M A #823358 5.954% 2/01/35 $1 PV ON 51.6900 SHARES DUE 3/25/2026 FEBRUARY FNMA DUE 3/25/26 -----51.69 ---SEI 25-Mar- 26 25-Mar-26 3137BSRE 5 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 3.120% 9/25/26 $1 PV ON 14025.1900 SHARES DUE 3/25/2026 $0.00260/PV ON 5,394,303.18 PV DUE 3/25/26 -----14,025.19 ---SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 05592XAD 2 BVO5428 P 20 PAID DOWN PAR VALUE OF BMW VEH OWNER TR 5.470% 2/25/28 -56,854.7400 ----56,854.74 -56,844.67 -10.07 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 3136AJZP 4 P 20 PAID DOWN PAR VALUE OF F N M A GTD REMIC 1.500% 4/25/29 -36,701.4000 ----36,701.40 -33,528.23 -3,173.17 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 3137HDJJ 0 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 4.803% 5/25/29 -2,331.4500 ----2,331.45 -2,340.92 --9.47 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31394JY35 FHL9543 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 6.49999% 9/25/43 -1,861.4200 ----1,861.42 -2,108.06 --246.64 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31397QRE 0 FNM2841 P 20 PAID DOWN PAR VALUE OF F N M A GTD REMIC 2.472% 2/25/41 -550.5500 ----550.55 -550.38 -0.17 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31417YAY 3 MA0022A P 20 PAID DOWN PAR VALUE OF F N M A #MA0022 4.500% 4/01/29 FEBRUARY FNMA DUE 3/25/26 -67.7500 ----67.75 -71.65 --3.90 SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 40 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Mar- 26 25-Mar- 26 25-Mar-26 31410F4V 4 888336A P 20 PAID DOWN PAR VALUE OF F N M A #888336 5.000% 7/01/36 FEBRUARY FNMA DUE 3/25/26 -591.3500 ----591.35 -635.70 --44.35 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31407BXH 7 826080A P 20 PAID DOWN PAR VALUE OF F N M A #826080 5.000% 7/01/35 FEBRUARY FNMA DUE 3/25/26 -82.6400 ----82.64 -88.84 --6.20 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 427,673.3400 -----427,673.34 427,673.34 --SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 3140XQTZ 0 FS8667A P 20 PAID DOWN PAR VALUE OF F N M A #FS8667 3.000% 10/01/30 FEBRUARY FNMA DUE 3/25/26 -113,585.2500 ----113,585.25 -111,952.46 1,632.79 -SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31403DJZ 3 745580A P 20 PAID DOWN PAR VALUE OF F N M A #745580 5.000% 6/01/36 FEBRUARY FNMA DUE 3/25/26 -283.0300 ----283.03 -304.26 --21.23 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31371NUC 7 257179A P 20 PAID DOWN PAR VALUE OF F N M A #257179 4.500% 4/01/28 FEBRUARY FNMA DUE 3/25/26 -380.0900 ----380.09 -401.98 --21.89 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 3138EG6F 6 AL0869A P 20 PAID DOWN PAR VALUE OF F N M A #AL0869 4.500% 6/01/29 FEBRUARY FNMA DUE 3/25/26 -40.5200 ----40.52 -42.85 --2.33 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31406XWT 5 823358A P 20 PAID DOWN PAR VALUE OF F N M A #823358 5.954% 2/01/35 FEBRUARY FNMA DUE 3/25/26 -125.2400 ----125.24 -124.26 -0.98 SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 41 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 25-Mar- 26 25-Mar- 26 25-Mar-26 31406PQY 8 815971A P 20 PAID DOWN PAR VALUE OF F N M A #815971 5.000% 3/01/35 FEBRUARY FNMA DUE 3/25/26 -286.9800 ----286.98 -308.50 --21.52 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31376KT 22 357969A P 20 PAID DOWN PAR VALUE OF F N M A #357969 5.000% 9/01/35 FEBRUARY FNMA DUE 3/25/26 -382.1800 ----382.18 -410.84 --28.66 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31403GXF 4 748678A P 20 PAID DOWN PAR VALUE OF F N M A #748678 5.000% 10/01/33 FEBRUARY FNMA DUE 3/25/26 -3.5600 ----3.56 -3.83 --0.27 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 3137BSRE 5 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 3.120% 9/25/26 -452,788.2400 ----452,788.24 -468,503.07 -- 15,714.8 3 SEI 25-Mar- 26 25-Mar- 26 25-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 466,813.4300 -----466,813.43 466,813.43 --SEI Post Date 25-Mar-26 Total ----216,266.27 1,632.79 - 12,936.9 0 SEI 27-Mar- 26 27-Mar-26 3130AH6Y 4 I 310 INTEREST EARNED ON F H L B DEB $1 PV ON 1300000.0000 SHARES DUE 3/27/2026 -----13,390.00 ---SEI 27-Mar- 26 27-Mar- 26 27-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 13,390.0000 -----13,390.00 13,390.00 --SEI Post Date 27-Mar-26 Total ----13,390.00 --SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 42 of 43 Multiple Accounts Begin Date : 03/01/2026 End Date : 03/31/2026 Account Information Account Number Account Name OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 31-Mar- 26 31-Mar-26 91282CGS 4 UST0030 I 310 INTEREST EARNED ON U S TREASURY NT 3.625% 3/31/30 $1 PV ON 10200000.0000 SHARES DUE 3/31/2026 -----184,875.00 ---SEI 31-Mar- 26 31-Mar-26 91282CEE 7 I 310 INTEREST EARNED ON U S TREASURY NT 2.375% 3/31/29 $1 PV ON 18000000.0000 SHARES DUE 3/31/2026 -----213,750.00 ---SEI 31-Mar- 26 31-Mar- 26 31-Mar-26 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 398,625.0000 -----398,625.00 398,625.00 --SEI Post Date 31-Mar-26 Total ----398,625.00 --SEI Account 6745046601 Total ----3,497,237.32 28,586.85 612,248. 71 SEI Account Ending Cash Principal Cash: - 118,285,531.96 Income Cash: 118,285,531.96 Total Cash: - Grand Total ---- 20,000,000.00 4,166,217.63 57,300.68 612,248. 71 SEI TRANSACTIONS - SUMMARY Run Date : 04/01/2026 Page 43 of 43 OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4868 Agenda Date:4/22/2026 Agenda Item No:5. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: MACARTHUR PUMP STATION REHABILITATION, PROJECT NO. 7-63 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Professional Design Services Agreement with Dudek to provide engineering services for MacArthur Pump Station Rehabilitation, Project No. 7-63, for an amount not to exceed $1,140,000; and B. Approve a contingency of $114,000 (10%). BACKGROUND Orange County Sanitation District (OC San)operates 15 pump stations that support wastewater conveyance throughout its service area.MacArthur Pump Station is an underground pump station that was constructed in 1965 and is located within an easement in the City of Newport Beach, surrounded by commercial land uses.An existing 21-inch influent pipeline conveys flow into the wet well,and flows exit the pump station through recently constructed 10-inch dual force mains.The facility was last rehabilitated in 1989. RELEVANT STANDARDS ·Comply with California Government Code Section 4526 to engage the best qualified firm “on the basis of demonstrated competence and qualifications” and “negotiate fair and reasonable fees” ·Operate and maintain facilities to minimize impacts on surrounding communities, including odor, noise, and lighting ·Protect OC San assets PROBLEM Due to the age of the pump station,many internal assets are reaching the end of their useful life. Recent inspections and a condition assessment of the facility identified coating failures in the wet well and corrosion within both the wet and dry wells, including corrosion on mechanical equipment. Orange County Sanitation District Printed on 4/14/2026Page 1 of 4 powered by Legistar™ File #:2026-4868 Agenda Date:4/22/2026 Agenda Item No:5. PROPOSED SOLUTION Approve a Professional Design Services Agreement to rehabilitate the pump station within the existing footprint,including both the wet well and dry well.The wet well concrete will be rehabilitated and lined.The pump room and electrical rooms within the dry well will also be rehabilitated,including replacement of mechanical and electrical equipment.Improvements to ventilation within the dry well will allow the space to be unclassified.Upon completion,the rehabilitation is expected to extend the service life of the pump station by an additional 20 to 30 years. TIMING CONCERNS Delaying approval of this agreement would postpone the start of design and subsequent construction activities.Any delay in initiating the rehabilitation may allow the existing deteriorated conditions within the pump station to continue progressing and could impact the long-term reliability of the facility. RAMIFICATIONS OF NOT TAKING ACTION If no action is taken,the existing deterioration within the pump station will continue to progress. Continued degradation of coatings,structural elements,and mechanical equipment could eventually lead to equipment failures,increased maintenance needs,or unplanned repairs that may disrupt pump station operations. PRIOR COMMITTEE/BOARD ACTIONS N/A ADDITIONAL INFORMATION Consultant Selection: OC San requested and advertised for proposals for MacArthur Pump Station Rehabilitation,Project No.7-63 on October 28,2025.The following evaluation criteria were described in the Request for Proposals (RFP) and used to determine the most qualified Consultant. CRITERION WEIGHT Project Understanding and Approach 35% Related Project Experience 35% Project Team and Staff Qualifications 30% Five proposals were received on December 9,2025,and evaluated in accordance with the evaluation process set forth in OC San’s Purchasing Ordinance (OC SAN-61)by a pre-selected Evaluation Team consisting of OC San staff,which include a Senior Engineer (Project Manager),Associate Engineer (Project Engineer),Engineering Supervisor,and Maintenance Supervisor.The Evaluation Team also included one non-voting representative from the Contracts Administration Division. The Evaluation Team scored the proposal on the established criteria as summarized in the table Orange County Sanitation District Printed on 4/14/2026Page 2 of 4 powered by Legistar™ File #:2026-4868 Agenda Date:4/22/2026 Agenda Item No:5. The Evaluation Team scored the proposal on the established criteria as summarized in the table below: Proposer Project Understanding and Approach (Max. 35 Points) Related Project Experience (Max. 35 Points) Project Team and Staff Qualifications (Max. 30 Points) Total Score (Max. 100 Points) 1 GHD Inc 30 27 23 80 2 Dudek 27 28 23 78 3 TYLin 28 26 23 77 4 CDM Smith Inc 24 25 23 72 5 HDR Engineering Inc.23 22 19 64 Based on this scoring,three Consultants were shortlisted for interviews on January 14,2026. Following the interview,each member of the Evaluation Team scored the Consultants based on both the proposals and interviews using the evaluation criteria and weighting described above.Based on the scoring shown below, Dudek was selected as the most qualified Consultant. Proposer Project Understanding and Approach (Max. 35 Points) Related Project Experience (Max. 35 Points) Project Team and Staff Qualifications (Max. 30 Points) Total Score (Max. 100 Points) 1 Dudek 33 33 28 94 2 TYLin 27 32 23 82 3 GHD Inc.25 25 21 71 Dudek,the proposer with the highest score,provided a clear and practical approach and demonstrated a comprehensive understanding of the scope of work.The technical proposal was well written and showed a good understanding of OC San’s expectations.Dudek provided a detailed approach to prepare a successful design,including a focus on facility operations and maintainability. Additionally,the multi-disciplined team had complementary experience and demonstrated the ability to successfully deliver the project.Therefore,the Evaluation Committee determined that Dudek is the most qualified firm to complete the project. Review of Fee Proposal and Negotiations: Proposals were accompanied by sealed fee proposals.In accordance with OC San’s Purchasing Ordinance,only the fee proposal of the highest-ranked firm was opened after approval of the Evaluation Committee’s recommendation by the Director of Engineering. Staff conducted negotiations with Dudek to clarify the requirements of the scope of work,the assumptions used for the estimated level of effort,and the proposed approach to meet the goals and objectives for the project. These discussions occurred over multiple meetings. The level of effort was increased based on clarifications to the project scope,including additional cost estimating and traffic control support. Orange County Sanitation District Printed on 4/14/2026Page 3 of 4 powered by Legistar™ File #:2026-4868 Agenda Date:4/22/2026 Agenda Item No:5. Original Fee Proposal Negotiated Fee Total Hours 3,847 3,962 Total Fee $1,068,856 $1,140,000 The Consultant’s fringe and overhead costs,which factor into the billing rate,have been substantiated.The contract profit is 8.48%,which is based on an established formula in OC San’s standard design agreements.Staff is requesting a 10 percent contingency to address revisions as the project progresses through preliminary and final design. Based on the above,staff has determined that the final negotiated fee is fair and reasonable for the level of effort required for this project and recommends approval of the Professional Design Services Agreement to Dudek. CEQA The project is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations sections 15301.A Notice of Exemption will be filed with the OC Clerk-Recorder and State Clearinghouse following OC San Board of Directors’approval of the Professional Design Services Agreement. FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget Update FY 2025-26,Page A-5,MacArthur Pump Station Rehabilitation, Project No. 7-63), and the budget is sufficient for the recommended action. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Professional Design Services Agreement OP:lb Orange County Sanitation District Printed on 4/14/2026Page 4 of 4 powered by Legistar™ PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 1 of 20 PROFESSIONAL DESIGN SERVICES AGREEMENT This PROFESSIONAL DESIGN SERVICES AGREEMENT, (hereinafter referred to as “Agreement”), is made and entered into to be effective the 22nd day of April, 2026 by and between the ORANGE COUNTY SANITATION DISTRICT, (hereinafter referred to as "OC SAN"), and Dudek, (hereinafter referred to as "CONSULTANT"). WITNESSETH: WHEREAS, OC SAN desires to engage CONSULTANT for MacArthur Pump Station Rehabilitation, Project No. 7-63; and to provide professional design services to replace and rehabilitate existing pump station assets that are reaching their useful life, (Services) and WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the necessary professional services; and WHEREAS, OC SAN has adopted procedures for the selection of professional design services and has proceeded in accordance with said procedures to select CONSULTANT to perform the Services; and WHEREAS, at its regular meeting on April 22, 2026 the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee pursuant to OC SAN’s current Purchasing Ordinance to approve this Agreement. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows: 1. SCOPE OF WORK CONSULTANT agrees to furnish necessary professional and technical services to accomplish those project elements outlined in the Scope of Work attached hereto as Attachment “A", and by this reference made a part of this Agreement. A. The CONSULTANT shall be responsible for the professional quality, technical accuracy, completeness, and coordination of all design, drawings, specifications, and other services furnished by the CONSULTANT under this Agreement, including the work performed by its subconsultants (Subconsultants). Where approval by OC SAN is indicated, it is understood to be conceptual approval only and does not relieve the CONSULTANT of responsibility for complying with all laws, codes, industry standards, and liability for damages caused by errors, omissions, noncompliance with industry standards, and/or negligence on the part of the CONSULTANT or its Subconsultants. B. CONSULTANT is responsible for the quality of work prepared under this Agreement and shall ensure that all work is performed to the standards of best engineering practice for clarity, uniformity, and completeness. CONSULTANT shall respond to all of OC SAN’s questions, comments, suggestions, corrections, and recommendations (i.e., DS1, DS2, DS3, and FDS). All comments shall be incorporated into the design prior to the next submittal deadline or addressed, in PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 2 of 20 writing, as to why the comment has not been incorporated. CONSULTANT shall ensure that each submittal is 100% accurate for the level of work submitted (i.e., correct references, terms, capitalization, or equal status, spelling, punctuation, etc.) C. In the event that work is not performed to the reasonable satisfaction of OC SAN and does not conform to the requirements of this Agreement or any applicable industry standards, the CONSULTANT shall, without additional compensation, promptly correct or revise any errors or deficiencies in its designs, drawings, specifications, or other services within the timeframe specified by the Project Engineer/Project Manager. OC SAN may charge to CONSULTANT all costs, expenses and damages associated with any such corrections or revisions. D. All CAD drawings, figures, and other work shall be produced by CONSULTANTS and Subconsultants using OC SAN CAD Manual. Conversion of CAD work from any other non-standard CAD format to OC SAN format shall not be acceptable in lieu of this requirement. Electronic files shall conform to OC SAN specifications. Any changes to these specifications by the CONSULTANT are subject to review and approval of OC SAN. Electronic files shall be subject to an acceptance period of 30 calendar days during which OC SAN shall perform appropriate reviews and including CAD Manual compliance. CONSULTANT shall correct any discrepancies or errors detected and reported within the acceptance period at no additional cost to OC SAN. E. The CONSULTANT shall ensure that all plans and specifications prepared or recommended under this Agreement allow for competitive bidding. The CONSULTANT shall design such plans or specifications so that procurement of services, labor or materials are not available from only one source, and shall not design plans and specifications around a single or specific product, piece of major equipment or machinery, a specific patented design or a proprietary process, unless required by principles of sound engineering practice and supported by a written justification that has been approved in writing by OC SAN. The CONSULTANT shall submit this written justification to OC SAN prior to beginning work on such plans and specifications. Whenever the CONSULTANT recommends a specific product or equipment for competitive procurement, such recommendation shall include at least two brand names of products that are capable of meeting the functional requirements applicable to the project. F. All professional services performed by the CONSULTANT, including but not limited to all drafts, data, correspondence, proposals, reports, and estimates compiled or composed by the CONSULTANT, pursuant to this Agreement, are for the sole use of OC SAN, its agents and employees. Neither the documents nor their contents shall be released to any third party without the prior written consent of OC SAN. This provision does not apply to information that (a) was publicly known, or otherwise known to the CONSULTANT, at the time that it was disclosed to the CONSULTANT by OC SAN, (b) subsequently becomes publicly known to the CONSULTANT other than through disclosure by OC SAN. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 3 of 20 2. COMPENSATION Total compensation shall be paid to CONSULTANT for the Services in accordance with the following provisions: A. Total Compensation Total compensation shall be in an amount not to exceed One Million One Hundred Forty Thousand Dollars ($1,140,000). Total compensation to CONSULTANT including burdened labor (salaries plus benefits), overhead, profit, direct costs, and Subconsultant(s) fees and costs shall not exceed the sum set forth in Attachment “E” - Fee Proposal. B. Labor As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus benefits) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this project. Direct Salary rates for CONSULTANT and its Subconsultants may be adjusted annually on January 1st by mutual agreement of the Parties. Escalation of the salary rate will be in accordance with Consumer Price Index of LA-Orange County Index. This rate is determined by the U.S. Department of Labor Statistics, Consumer Price Index – Los Angeles/ Orange County Metropolitan Area. C. Overhead As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall compensate CONSULTANT and Subconsultants for overhead at the rate equal to the percentage of burdened labor as specified in Attachment “E” - Fee Proposal. D. Profit Profit for CONSULTANT and Subconsultants shall be a percentage of consulting services fees (Burdened Labor and Overhead). When the consulting or subconsulting services amount is $250,000 or less, the maximum Profit shall be 10%. Between $250,000 and $2,500,000, the maximum Profit shall be limited by a straight declining percentage between 10% and 5%. For consulting or subconsulting services fees with a value greater than $2,500,000, the maximum Profit shall be 5%. Addenda shall be governed by the same maximum Profit percentage after adding consulting services fees. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 4 of 20 CONSULTANT and Subconsultants for this project according to Attachment “E” - Fee Proposal. E. Subconsultants For any Subconsultant whose fees for services are greater than or equal to $100,000 (excluding out-of-pocket costs), CONSULTANT shall pay to Subconsultant total compensation in accordance with the Subconsultant amount specified in Attachment “E” - Fee Proposal. For any Subconsultant whose fees for services are less than $100,000, CONSULTANT may pay to Subconsultant total compensation on an hourly-rate basis per the attached hourly rate Schedule and as specified in the Scope of Work. OC SAN shall pay to CONSULTANT the actual costs of Subconsultant fees and charges in an amount not to exceed the sum set forth in Attachment “E” - Fee Proposal. F. Direct Costs OC SAN shall pay to CONSULTANT and Subconsultants the actual costs of permits and associated fees, travel and licenses for an amount not to exceed the sum set forth in Attachment “E” - Fee Proposal. OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN. Upon request, CONSULTANT shall provide to OC SAN receipts and other documentary records to support CONSULTANT’s request for reimbursement of these amounts, see Attachment “D” - Allowable Direct Costs. All incidental expenses shall be included in overhead pursuant to Section 2 - COMPENSATION above. G. Other Direct Costs Other Direct Costs incurred by CONSULTANT and its Contractor due to modifications to the Scope of Work resulting from field investigations and field work required by the Agreement. These items may include special equipment, test equipment and tooling and other materials and services not previously identified. Refer to attachment “D” Allowable Direct Costs for payment information. H. Reimbursable Direct Costs OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this Agreement. The reimbursement of the above-mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at https://www.gsa.gov/travel/plan-book/per-diem-rates. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 5 of 20 The CONSULTANT shall be responsible for the most economical and practical means of management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN. Travel and travel arrangements – Any travel involving airfare, overnight stays or multiple day attendance must be approved by OC SAN in advance. Local Travel is considered travel by the CONSULTANT within OC SAN general geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial, and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel. Lodging – Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN. Travel Meals – Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals. Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this Agreement. I. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services described in CONSULTANT’s Proposal will exceed seventy-five percent (75%) of the not-to-exceed amount of the Agreement, including approved additional compensation, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this Agreement. 3. REALLOCATION OF TOTAL COMPENSATION OC SAN, by its Director of Engineering, shall have the right to approve a reallocation of the incremental amounts constituting the total compensation, provided that the total compensation is not increased. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 6 of 20 4. PAYMENT A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period. CONSULTANT shall allocate costs in the same manner as it would for payment requests as described in this Section of the Agreement. CONSULTANT shall warrant and certify the accuracy of these costs and understand that submitted costs are subject to Section 11 - AUDIT PROVISIONS. B. CONSULTANT may submit monthly or periodic statements requesting payment for those items included in Section 2 - COMPENSATION hereof in the format as required by OC SAN. Such requests shall be based upon the amount and value of the work and services performed by CONSULTANT under this Agreement and shall be prepared by CONSULTANT and accompanied by such supporting data, including a detailed breakdown of all costs incurred and work performed during the period covered by the statement, as may be required by OC SAN. Upon approval of such payment request by OC SAN, payment shall be made to CONSULTANT within thirty (30) days of invoice receipt of one hundred percent (100%) of the invoiced amount on a per task basis. If OC SAN determines that the work under this Agreement, or any specified task hereunder, is incomplete and that the amount of payment is in excess of: i. The amount considered by OC SAN’s Director of Engineering to be adequate for the protection of OC SAN; or ii. The percentage of the work accomplished for each task. OC SAN may, at the discretion of the Director of Engineering, retain an amount equal to that which ensures that the total amount paid to that date does not exceed the percentage of the completed work for each task or the project in its entirety. C. CONSULTANT may submit periodic payment requests for each 30-day period of this Agreement for the profit as set forth in Section 2 - COMPENSATION above. Said profit payment request shall be proportionate to the work actually accomplished to date on a per task basis. In the event OC SAN's Director of Engineering determines that no satisfactory progress has been made since the prior payment, or in the event of a delay in the work progress for any reason, OC SAN shall have the right to withhold any scheduled proportionate profit payment. D. Upon satisfactory completion by CONSULTANT of the work called for under the terms of this Agreement, and upon acceptance of such work by OC SAN, CONSULTANT will be paid the unpaid balance of any money due for such work, including any retained percentages relating to this portion of the work. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 7 of 20 E. Upon satisfactory completion of the work performed hereunder and prior to final payment under this Agreement for such work, or prior settlement upon termination of this Agreement, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this Agreement other than such claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein. F. Pursuant to the California False Claims Act (Government Code Sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this Agreement may be held liable for treble damages and up to a ten thousand dollars ($10,000) civil penalty for each false claim submitted. This Section shall also be binding on all Subconsultants. A CONSULTANT or Subconsultant shall be deemed to have submitted a false claim when the CONSULTANT or Subconsultant: a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by OC SAN; c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or e) is a beneficiary of an inadvertent submission of a false claim to OC SAN, and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim. 5. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section 1771.4, the work is subject to compliance monitoring and enforcement by the DIR. B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776. C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 8 of 20 D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulation Section 16461(e). 6. DOCUMENT OWNERSHIP – SUBSEQUENT CHANGES TO PLANS AND SPECIFICATIONS A. Ownership of Documents for the Services performed. Upon full payment to CONSULTANT for Services rendered, all documents, including but not limited to, original plans, studies, sketches, drawings, computer printouts and disk files, and specifications prepared in connection with or related to the Scope of Work or Services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed. OC SAN ownership entitlement arises upon payment for work performed and includes ownership of any and all work product completed prior to that payment. This Section shall apply whether the CONSULTANT’s Services are terminated: a) by the completion of the Agreement, or b) in accordance with other provisions of this Agreement. Notwithstanding any other provision of this paragraph or Agreement, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer printouts and disk files, and specifications. B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the plans or specifications, where the subsequent changes or uses are not authorized or approved by CONSULTANT. 7. INSURANCE A. General i. Insurance shall be issued and underwritten by insurance companies acceptable to OC SAN. ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Workers’ Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent. iii. Coverage shall be in effect prior to the commencement of any work under this Agreement. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 9 of 20 B. General Liability The CONSULTANT shall maintain during the life of this Agreement, including the period of warranty, commercial general liability insurance written on an occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000) aggregate. If aggregate limits apply separately to this Agreement (as evidenced by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: premises-operations, blanket contractual liability (for this Agreement), products liability/completed operations (including any product manufactured or assembled), broad form property damage, blanket contractual liability, independent contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) and Riggers/On Hook Liability must be included in the general liability policy and coverage must be reflected on the submitted certificate of insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor, or subcontractor performing work or rendering services on behalf of OC SAN in connection with the planning, development, and construction of the project. In all its insurance coverages related to the work, CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their officers, agents, or employees, or any other consultant, contractor, or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged. C. Automobile/Vehicle Liability Insurance The CONSULTANT shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: combined single limit of One Million Dollars ($1,000,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement. D. Umbrella Excess Liability The minimum limits of general liability and automobile liability insurance required, as set forth herein, shall be provided for through either a single policy of primary PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 10 of 20 insurance or a combination of policies of primary and umbrella excess coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automobile liability. E. Workers’ Compensation Insurance The CONSULTANT shall provide such workers’ compensation insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including employer’s liability insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such workers’ compensation insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones Act claims. F. Errors and Omissions/Professional Liability CONSULTANT shall maintain in full force and effect, throughout the term of this Agreement, standard industry form professional liability / errors and omissions insurance coverage with coverage limits of not less than Two Million Dollars ($2,000,000) in accordance with the provisions of this paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of five (5) years from the date of the completion of the services hereunder. In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of CONSULTANT during the course of performing services under the terms of this Agreement. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis, said policy shall be continued in full force and effect during the term of this Agreement or until completion of the services provided for in this Agreement, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts or omissions of CONSULTANT during the course of performing services under the terms of this Agreement. CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 11 of 20 G. Drone Liability Insurance If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of One Million Dollars ($1,000,000) in form acceptable to OC SAN. H. Proof of Coverage The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before work commences. OC SAN reserves the right to require, at any time, complete, certified copies of all required insurance policies, including endorsements, effecting the coverage required. The following are approved forms that must be submitted as proof of coverage: •of insurance form • (General Liability) CG 20 10 and CG 20 37 All other additional insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN. • Additional Insured (Automobile Liability) OC SAN approval. •subrogation endorsement provided by carrier for OC SAN approval. •CONSULTANT is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below. I. Cancellation and Policy Change Notice The CONSULTANT is required to notify OC SAN in writing of any insurance cancellation notice it receives or other knowledge of pending or actual insurance policy cancellation within two (2) working days of receipt of such notice or acquisition of such knowledge. Additionally, the CONSULTANT is required to notify OC SAN in writing of any change in the terms of insurance, including reduction in coverage or increase in deductible/SIR, within two (2) working days of receipt of such notice or knowledge of same. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 12 of 20 Said notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Contracts, Purchasing & Materials Management Division J. Primary Insurance The general and automobile liability policies shall contain a Primary and “Non Contributory” clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT. K. Separation of Insured The general and automobile liability policies shall contain a “Separation of Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this Agreement, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property. M. Deductibles and Self-Insured Retentions Any deductible and/or self-insured retention must be declared to OC SAN on the certificate of insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses. N. Defense Costs The general and automobile liability policies shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits. O. Subconsultants The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 13 of 20 P. Limits Are Minimums If the CONSULTANT maintains higher limits than any minimums shown above, then OC SAN requires and shall be entitled to coverage for the higher limits maintained by CONSULTANT. 8. SCOPE CHANGES In the event of a change in the Scope of Work or other terms in the Agreement, as requested by OC SAN, the parties hereto shall execute an Amendment to this Agreement setting forth with particularity all terms of the new Agreement, including, but not limited to, any additional CONSULTANT's fees. CONSULTANT hereby agrees to use any and all procedures, programs, and systems required by OC SAN to process and execute such Amendment(s), including, but not limited to, computer programs and systems. 9. PROJECT TEAM AND SUBCONSULTANTS CONSULTANT shall provide to OC SAN, prior to execution of this Agreement, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used on this project by CONSULTANT. CONSULTANT shall include a description of the scope of work to be done by each Subconsultant and each CONSULTANT’s project team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant on a per task basis, broken down as indicated in Section 2 - COMPENSATION. There shall be no substitution of the listed Subconsultants and CONSULTANT’s project team members without prior written approval by OC SAN. 10. ENGINEERING REGISTRATION The CONSULTANT’s personnel are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered engineer but represents and agrees that wherever in the performance of this Agreement requires the services of a registered engineer, such services hereunder will be performed under the direct supervision of registered engineers. 11. AUDIT PROVISIONS A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents, and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this Agreement. The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 14 of 20 OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this Agreement during the term of this Agreement and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all project related accounting records and documents, and any other financial data. 12. LEGAL RELATIONSHIP BETWEEN PARTIES The legal relationship between the parties hereto is that of an independent contractor and nothing herein shall be deemed to make CONSULTANT an employee of OC SAN. 13. NOTICES All notices hereunder and communications regarding the interpretation of the terms of this Agreement, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return receipt requested, postage prepaid. Notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Yai Phongmekhin, Contracts Administrator Copy: Omeed Pour, Project Manager Notices shall be mailed to CONSULTANT at: Dudek 687 S Coast Highway 101 Suite 110 Encinitas, CA 92024 Attention: Brandon Lacap, Project Manager All communication regarding the Scope of Work, will be addressed to the Project Manager. Direction from other OC SAN’s staff must be approved in writing by OC SAN’s Project Manager prior to action from the CONSULTANT. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 15 of 20 14. TERMINATION OC SAN may terminate this Agreement at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination, CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination. CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this Agreement, when the same are due. Notice of termination shall be mailed to OC SAN and/or CONSULTANT in accordance with Section 13 - NOTICES. 15. DOCUMENTS AND STUDY MATERIALS The documents and study materials for this project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, computation and study materials in its files pertaining to the work described in this Agreement, which is requested in writing by OC SAN. 16. COMPLIANCE A. Labor CONSULTANT certifies by the execution of this Agreement that it pays employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all federal, state and local directives and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment. B. Air Pollution CONSULTANT and its subconsultants and subcontractors shall comply with all applicable federal, state and local air pollution control laws and regulations. C. Iran Contracting Act CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208). D. California Air Resources Board Mobile Source Regulations CONSULTANT and its subconsultants and subcontractors shall comply with the following California Air Resources Board Mobile Source Regulations: PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 16 of 20 • Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6 • Truck & Bus Regulation (T&B): 13 CCR 2025 • Clean Truck Check (CTC): 13 CCR 2195-2199.1 • Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2 17. AGREEMENT EXECUTION AUTHORIZATION Both OC SAN and CONSULTANT do covenant that each individual executing this document by and on behalf of each party is a person duly authorized to execute agreements for that party. 18. DISPUTE RESOLUTION In the event of a dispute arising between the parties regarding performance or interpretation of this Agreement, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services. 19. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which it may be entitled. 20. PROGRESS REPORTS Monthly progress reports shall be submitted for review by the tenth day of the following month and must include as a minimum: 1) current activities, 2) future activities, 3) potential items that are not included in the Scope of Work, 4) concerns and possible delays, 5) percentage of completion, and 6) budget status. 21. WARRANTY CONSULTANT shall perform its services in accordance with generally accepted industry and professional standards. If, within the 12-month period following completion of its services, OC SAN informs CONSULTANT that any part of the services fails to meet those standards, CONSULTANT shall, within the time prescribed by OC SAN, take all such actions as are necessary to correct or complete the noted deficiency(ies). 22. INDEMNIFICATION To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN, which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, consultants, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and OC SAN’s PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 17 of 20 general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in carrying out its obligations under this Agreement to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, CONSULTANT, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from: (A) the active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or (C) the independent action of a third party who is neither one of the Indemnified Parties nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them. Exceptions (A) through (B) above shall not apply, and CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder. CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the provisions of this Agreement. Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this Agreement are contractual and the result of negotiation between the parties hereto. Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting party, shall not be employed in the interpretation of this Agreement. 23. DUTY TO DEFEND The duty to defend hereunder is wholly independent of and separate from the duty to indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code Section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 18 of 20 CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this Agreement until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 24. CONSULTANT PERFORMANCE The CONSULTANT’s performance shall be evaluated by OC SAN. A copy of the evaluation shall be sent to the CONSULTANT for comment. The evaluation, together with the comments, shall be retained by OC SAN and may be considered in future CONSULTANT selection processes. 25. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES CONSULTANT shall comply with all OC SAN policies and procedures, including, but not limited to, the Contractor Safety Standards, as applicable, and Human Resources Policies, all as may be amended from time to time. 26. CLOSEOUT When OC SAN determines that all work authorized under the Agreement is fully complete and that OC SAN requires no further work from CONSULTANT, or the Agreement is otherwise terminated or expires in accordance with the terms of the Agreement, OC SAN shall give the Consultant written notice that the Agreement will be closed out. CONSULTANT shall submit all outstanding billings, work submittals, deliverables, reports or similarly related documents as required under the Agreement within thirty (30) days of receipt of notice of Agreement closeout. Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the Agreement and will either: i. Give the CONSULTANT a final Agreement Acceptance: or ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in this Agreement. Such support must be provided within the timeframe requested by OC SAN. Notwithstanding the final Agreement Acceptance the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise); and the CONSULTANT shall remain obligated under all those provisions of the Agreement which expressly or by their nature extend beyond and survive final Agreement Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final Agreement Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or agreement with, the CONSULTANT’s request for final Agreement Acceptance. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 19 of 20 27. ENTIRE AGREEMENT This Agreement constitutes the entire understanding and agreement between the Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof. PDSA PROJECT NO. 7-63 Revised 050625 MACARTHUR PUMP STATION REHABILITATION Page 20 of 20 IN WITNESS WHEREOF, this Agreement has been executed in the name of OC SAN and CONSULTANT by their respective duly authorized officers as of the day and year first written above. DUDEK By _______________________________ _________________ Date __________________________________________________ Printed Name & Title ORANGE COUNTY SANITATION DISTRICT By _______________________________ _________________ Ryan P. Gallagher Date Board Chairman By _______________________________ _________________ Kelly A. Lore Date Clerk of the Board By _______________________________ _________________ Kevin Work Date Purchasing & Contracts Manager Attachments: Attachment “A” – Scope of Work Attachment “B” – Labor Hour Matrix Attachment “C” – Not Attached Attachment “D” – Allowable Direct Costs Attachment “E” – Fee Proposal Attachment “F” – Not Used Attachment “G” – Not Attached Attachment “H” – Not Used Attachment “I” – Cost Matrix and Summary Attachment “J” – Not Attached Attachment “K” – Minor Subconsultant Hourly Rate Schedule Attachment “L” – Contractor Safety Standards Attachment "M” – Not Attached Attachment "N” – Not Attached Attachment “O” – Human Resources Policies YP ATTACHMENT “A” SCOPE OF WORK March 2026 7-63 – Design SOW Page 1 of 41 ATTACHMENT "A" SCOPE OF WORK MacArthur Pump Station Rehabilitation Project No. 7-63 March 2026 7-63 – Design SOW Page 2 of 41 TABLE OF CONTENTS 1. PROJECT REQUIREMENTS ................................................................................................................ 5 SUMMARY ...................................................................................................................... 5 1.0.1 Professional Design Engineering Services ..................................................... 5 1.0.2 Professional Licensing requirements ............................................................... 5 BACKGROUND .............................................................................................................. 5 GENERAL PROJECT DESCRIPTION ....................................................................... 6 PROJECT EXECUTION PHASES .............................................................................. 6 DESCRIPTION OF PROJECT ELEMENTS .............................................................. 6 1.4.1 Project Element 1 – Wet Well Rehabilitation .................................................. 6 1.4.2 Project Element 2 – Pump Room Rehabilitation............................................ 7 1.4.3 Project Element 3 – Electrical Room Improvements ..................................... 7 1.4.4 Project Element 4 – Address Hazardous Area Classification ...................... 8 1.4.5 Project Element 5 – Wall Repairs .................................................................... 8 1.4.6 Temporary Facilities During Construction ....................................................... 8 1.4.7 Coordination with Other Projects ..................................................................... 9 DESIGN CONSIDERATIONS ...................................................................................... 9 1.5.1 Technology and configuration choices ............................................................ 9 1.5.2 Design Decisions ................................................................................................ 9 1.5.3 Design Selection Criteria ................................................................................... 9 1.5.4 Construction Cost Estimate ............................................................................... 9 PROJECT SCHEDULE ................................................................................................. 9 1.6.1 General ................................................................................................................. 9 2. PHASE 2 – PRELIMINARY DESIGN .................................................................................................. 10 PRELIMINARY DESIGN EXECUTION ..................................................................... 10 2.0.1 Major Decisions ................................................................................................ 10 PREDESIGN EVALUTION STUDIES (NOT USED) .............................................. 11 PRELIMINARY DESIGN PRODUCTION ................................................................. 11 2.2.1 General ............................................................................................................... 11 2.2.2 Design Memos .................................................................................................. 11 2.2.3 Preliminary Design Drawings .......................................................................... 13 2.2.4 Preliminary Design Report (PDR) Production, Contents and Organization 13 2.2.5 Preliminary Design Cost Estimate ................................................................. 14 PRELIMINARY DESIGN ACTIVITIES ...................................................................... 14 2.3.1 Hazardous Area De-Classification Approach ............................................... 14 2.3.2 Waterproofing Approach .................................................................................. 14 2.3.3 DCS Server Installation Requirements and Approach ................................ 14 2.3.4 Equipment arrangement .................................................................................. 15 2.3.5 Implementation Plan and Construction Sequencing ................................... 15 2.3.6 Easements, Property Boundaries and Work Area Limits ........................... 15 2.3.7 Topographic Survey ......................................................................................... 15 2.3.8 Traffic Control Services ................................................................................... 15 2.3.9 Utility Investigation ............................................................................................ 16 2.3.10 Environmental Documentation ....................................................................... 17 2.3.11 Permitting Assistance....................................................................................... 18 2.3.12 Project Safety Review ...................................................................................... 18 2.3.13 Project Management ........................................................................................ 19 March 2026 7-63 – Design SOW Page 3 of 41 2.3.14 Risk Management ............................................................................................. 20 2.3.15 Quality Control .................................................................................................. 20 PDR WORKSHOPS AND MEETINGS ..................................................................... 20 2.4.1 General ............................................................................................................... 20 2.4.2 PDR Production Workshops ........................................................................... 20 2.4.3 Design memo Workshops ............................................................................... 21 2.4.4 PDR Review Workshops ................................................................................. 21 2.4.5 Maintainability Workshops............................................................................... 21 2.4.6 Technical Progress Meetings ......................................................................... 22 2.4.7 Focused Meetings ............................................................................................ 22 2.4.8 Coordination with Other Projects Meetings .................................................. 23 2.4.9 Stormwater Compliance Meeting ................................................................... 23 3. PHASE 3 – DESIGN ............................................................................................................................ 23 BID DOCUMENTS ....................................................................................................... 23 3.0.1 General ............................................................................................................... 23 3.0.2 Engineering Design Guideline Updates ........................................................ 23 3.0.3 General Requirements and Additional General Requirements ................. 23 3.0.4 Design Submittals ............................................................................................. 24 3.0.5 Cable and Conduit Schedule .......................................................................... 24 3.0.6 Commissioning Plan Materials ....................................................................... 24 3.0.7 Equipment and Instrumentation Database (EID) ......................................... 25 3.0.8 Real IO List ........................................................................................................ 25 3.0.9 Construction Submittal Items List ................................................................... 25 3.0.10 Temporary Facilities During Contruction ....................................................... 25 DESIGN SUPPORT DOCUMENTATION ................................................................. 26 3.1.1 Design Submittal Support Documentation .................................................... 26 3.1.2 Construction Cost Estimate ............................................................................. 27 3.1.3 Construction Schedule ..................................................................................... 27 3.1.4 Procurement Alternatives ................................................................................ 27 DESIGN ACTIVITIES .................................................................................................. 27 3.2.1 Easements, Property Boundaries and Work Area Limits ........................... 27 3.2.2 Topographic Survey ......................................................................................... 27 3.2.3 Utility Investigation ............................................................................................ 28 3.2.4 Fire Protection Services................................................................................... 28 3.2.5 Traffic Control Services ................................................................................... 28 3.2.6 Public Relations ................................................................................................ 28 3.2.7 Environmental Documentation ....................................................................... 28 3.2.8 Permitting assistance ....................................................................................... 28 3.2.9 Project Safety Review ...................................................................................... 28 3.2.10 Project Management ........................................................................................ 29 3.2.11 Risk Management ............................................................................................. 29 3.2.12 Quality Control .................................................................................................. 29 DESIGN WORKSHOPS AND MEETINGS .............................................................. 29 3.3.1 General ............................................................................................................... 29 3.3.2 Design Phase Workshops ............................................................................... 29 3.3.3 Post-DS2 Constructability Workshop ............................................................ 30 3.3.4 Design Phase Meetings ................................................................................... 31 3.3.5 CONSULTANT Office Technical Meetings (COTMs) ................................. 32 3.3.6 Coordination with Other Projects Meetings .................................................. 32 3.3.7 Commissioning Team Meetings ..................................................................... 34 March 2026 7-63 – Design SOW Page 4 of 41 3.3.8 Project Safety .................................................................................................... 34 3.3.9 Construction Submittal Items List Meeting ................................................... 34 3.3.10 Stormwater Compliance Meeting ................................................................... 35 BID PHASE SUPPORT SERVICES ......................................................................... 35 3.4.1 Bid Phase Support Services ........................................................................... 35 3.4.2 Bid Evaluation Assistance ............................................................................... 35 3.4.3 Conformed Document Preparation ................................................................ 35 4. PHASE 4 – CONSTRUCTION AND INSTALLATION SERVICES ..................................................... 35 5. PHASE 5 – COMMISSIONING SERVICES ........................................................................................ 35 6. PHASE 6 – CLOSE OUT .................................................................................................................... 35 7. GENERAL REQUIREMENTS ............................................................................................................. 35 GENERAL ..................................................................................................................... 35 7.0.1 OC SAN Engineering Design Guidelines and Strategic Plan .................... 35 7.0.2 Project Phases and Tasks............................................................................... 36 7.0.3 Construction Sequencing and Constraints ................................................... 36 7.0.4 Working Hours .................................................................................................. 36 7.0.5 Standard Drawings and Typical Details ........................................................ 37 7.0.6 Software ............................................................................................................. 37 7.0.7 Submittal Review using Bluebeam ................................................................ 37 7.0.8 Word Track Changes ....................................................................................... 37 7.0.9 GIS Submittals .................................................................................................. 37 8. PROJECT-SPECIFIC DEVIATIONS FROM OC SAN DESIGN GUIDELINES .................................. 39 ENGINEERING DESIGN GUIDELINES CHAPTER 01, “DESIGN GUIDELINES – GENERAL REQUIREMENTS” ............................................................................................ 39 8.0.1 Engineering Design Guidelines Chapter 06, “Mechanical Design” ........... 39 9. STAFF ASSISTANCE ......................................................................................................................... 40 10. EXHIBITS ............................................................................................................................................ 40 March 2026 7-63 – Design SOW Page 5 of 41 1. PROJECT REQUIREMENTS SUMMARY 1.0.1 PROFESSIONAL DESIGN ENGINEERING SERVICES A. Provide professional design engineering services for the project described herein including the following: 1. Engineering studies 2. Preliminary Design Report 3. Permitting assistance 4. Preparation of bid documents 1.0.2 PROFESSIONAL LICENSING REQUIREMENTS A. All plans and specifications shall be prepared by a professional engineer licensed in the State of California of the associated discipline. BACKGROUND The existing MacArthur Pump Station (Exhibit 19 – Project Reference Material) is an underground pump station that was built in 1965 and is located on an easement in the City of Newport Beach. The existing pump station is surrounded by commercial land use and is accessed from the west side of MacArthur Blvd, approximately 500 feet north of Von Karman Avenue (Figure 1 – Project Location Map). An existing 21-inch influent pipe conveys flow into the wet well. The existing 12-inch forcemain exiting the pump station was abandoned and replaced with a 10-inch dual forcemain by Project 7-68 (Exhibit 19 – Project Reference Material). In addition, as part of Project 7-68, the existing valve vault was removed and replaced. The assets within the existing pump station are reaching the end of their useful life and require replacement or rehabilitation. A condition assessment of the pump station revealed exposed aggregate with ½”-1” of soft concrete, corroded steel, and corrosion stains in the wet well, and observed significant coating failures and corrosion on the pump supports, pump suction pipe sections, pipe supports, pump casings, and discharge pipes. See Exhibit 19 – Project Reference Material for an evaluation of the existing pump station. A structural evaluation of the pump station found that the overall pump station structure appeared to be in condition, however, moisture intrusion was observed, likely due to groundwater. See Exhibit 19 – Project Reference Material for a structural evaluation of the pump station. For these reasons, OC SAN has decided to rehabilitate the pump station within the boundaries of the existing footprint, extending the life of the existing pump station without a full replacement for another 20 to 30 years. March 2026 7-63 – Design SOW Page 6 of 41 Figure 1 – Project Location Map GENERAL PROJECT DESCRIPTION The project consists of rehabilitating the existing wet well concrete, replacing all existing internal equipment in the pump station and electrical rooms, addressing area classification, and repairing the pump room and electrical room walls. PROJECT EXECUTION PHASES All OC SAN projects are divided into six phases. CONSULTANT shall provide engineering services for all Project Elements listed in this Scope of Work for the following Phases: Phase 1 – Project Development (Not in this Scope of Work) Phase 2 – Preliminary Design Phase 3 – Design Phase 4 – Construction (Not in this Scope of Work) Phase 5 – Commissioning (Not in this Scope of Work) Phase 6 – Close Out (Not in this Scope of Work) DESCRIPTION OF PROJECT ELEMENTS Detailed descriptions of the Project Elements are presented below. 1.4.1 PROJECT ELEMENT 1 – WET WELL REHABILITATION A. The existing soft concrete on the surface of the wet well will be rehabilitated and the internal surface will be lined. March 2026 7-63 – Design SOW Page 7 of 41 B. Assumptions for Level of Effort 1. For the purpose of estimating the predesign and design phase levels of effort, the CONSULTANT shall make the following assumptions regarding this project element: a. Suction bell elbows will be replaced. b. The existing bubbler system will be demolished and removed in this project. One existing ultrasonic transmitter and one radar level transmitter are to be protected in place. 1.4.2 PROJECT ELEMENT 2 – PUMP ROOM REHABILITATION A. The pump room rehabilitation element consists of the replacement of all internal mechanical equipment. Flowrates (MGD) are shown in the table below: Reported Capacity 2017 PDWF 2017 PWWF 2040 PDWF 2040 PWWF 3.6 1.7 2.3 2.0 2.5 B. The pump room will house the following components and provide the necessary access required for operations and maintenance: 1. Replace existing pumps with (2) dry submersible main sewage pumps (One duty pump and one standby pump – the same size) with pump motors controlled by variable frequency drives (VFDs) that are equipped with constant speed bypass mode of operation. 2. Replace submersible, non-clog sump pump 3. Replace suction, header, discharge pipe, wall spool, wall pipe penetration, pipe supports, and associated valves 4. New flow meter C. Assumptions for Level of Effort 1. For the purpose of estimating the predesign and design phase levels of effort, the CONSULTANT shall make the following assumptions regarding this project element: a. All new equipment will be replaced within the same footprint. 1.4.3 PROJECT ELEMENT 3 – ELECTRICAL ROOM IMPROVEMENTS A. Replace all existing electrical, mechanical and control equipment including but not limited to the following: 1. (2) Motor control centers (MCCs) 2. (2) Variable frequency drives (VFDs - included with Constant Speed Bypass) 3. Metering Switchboard 4. Utility Switchboard 5. Transformer 6. Panelboards 7. Distributed control system (DCS) Controller 8. Remote Input/Output (RIO) Cabinet (included with DCS Controller) 9. Uninterruptable power supply (UPS) 10. Replace existing selector switch panel and level instruments March 2026 7-63 – Design SOW Page 8 of 41 11. DCS server cabinet with front and rear floor access 12. Redundant DCS servers and supporting communications equipment 13. Operator workstation cabinet 14. Go/No-Go Panel, Lighting and Signage (New) B. Assumptions for Level of Effort 1. For the purpose of estimating the predesign and design phase levels of effort, the CONSULTANT shall make the following assumptions regarding this project element: a. The Level Measurement system is to be replaced with a combination Ultrasonic and Radar Level Monitoring System per Project No. FE23-03 and to be completed prior to this project. The transmitter panel of the combination ultrasonic and radar level measurement system may need to be re-used and relocated to accommodate for the installation of the new electrical and mechanical equipment in the electrical room. The existing bubbler panel and air compressors will be demolished and removed as part of this project. b. All new equipment will be installed within the existing footprint of the electrical room. 1.4.4 PROJECT ELEMENT 4 – ADDRESS HAZARDOUS AREA CLASSIFICATION A. The existing electrical room does not meet the current fire code and is classified as Class 1 Division 2. There is one existing aboveground supply fan, (1) 14” diameter supply duct in the pump room, and (1) 8” diameter exhaust duct in the electrical room. The existing ventilation system will be replaced with (1) duty and (1) standby fan that meet CCR Title 8 regulations, NFPA 820 and OC SAN design guidelines to declassify the electrical room. 1.4.5 PROJECT ELEMENT 5 – WALL REPAIRS A. The dry well and electrical room wall cracks will be sealed and repaired to prevent corrosion of the wall reinforcing. 1.4.6 TEMPORARY FACILITIES DURING CONSTRUCTION A. In certain cases, construction sequencing constraints may require the Contractor to construct a temporary facility to be used during a certain portion of the construction period. CONSULTANT shall identify in what instances such facilities are required or reasonably warranted and present those instances with implementation plans and construction sequencing constraints to OC SAN for consideration. When such facilities are found to be either required or reasonably warranted, CONSULTANT shall provide sufficiently detailed drawings and specifications to be included in the Bid Documents that bidders understand what is required to provide and potentially operate the temporary facilities and that the reliability and performance of the facilities will meet OC SAN’s needs and reasonably mitigate construction risks. Examples of potential facilities include: 1. A bypass pumping system will be required for temporary handling of flows during construction. Influent flows will be captured at the upstream manhole (SUN0155-0285) and fed to the downstream dual 10” forcemains in the existing valve vault. Manhole SUN0155- 0285 is located in the sidewalk within OC SAN’s easement. The temporary bypass pumping system must comply with OC SAN’s goal of zero sewage spills. 2. Temporary MCC or 480V panelboard to install new electrical equipment 3. Temporary standby power to accommodate the transfer of electrical loads from existing electrical equipment to new electrical equipment and the phasing of the electrical system from the existing standby power electrical distribution equipment and synchronizing controls to the new synchronizing switchgear. March 2026 7-63 – Design SOW Page 9 of 41 1.4.7 COORDINATION WITH OTHER PROJECTS A. The following projects may impact or require coordination with this project. The CONSULTANT shall coordinate with each project and incorporate work restrictions and requirements in the design documents. 1. City of Newport Beach Public Works Department, MacArthur Blvd Paving Improvements 2026-2027. The City of Newport Beach will be performing pavement rehabilitation on MacArthur Blvd from Jamboree Rd to Campus Dr tentatively January 2026. DESIGN CONSIDERATIONS The following design considerations shall be carried out from Preliminary Design through Final Design. 1.5.1 TECHNOLOGY AND CONFIGURATION CHOICES The project elements in this facility shall be achieved using proven technologies. Alternative means of accomplishing the project elements must be reviewed and accepted by OC SAN prior to detailed evaluation. All alternative technologies proposed should be currently operating in other wastewater treatment facilities of similar capacity. 1.5.2 DESIGN DECISIONS Design decisions shall be agreed upon by OC SAN prior to any work being performed by the CONSULTANT in preliminary and detailed design. All design decisions shall be documented. 1.5.3 DESIGN SELECTION CRITERIA A. Design selection shall consider construction, lifecycle, operation, and maintenance costs as well as process benefits and overall quality. When design recommendations are presented to OC SAN, the design selection criteria shall be clearly identified with the recommendation. B. The life cycle cost analysis for the options proposed shall include costs for engineering, construction, start-up, and operational and maintenance, and future rehabilitation and replacement. Life cycle cost analysis is described in Section 01.2.19 of the Engineering Design Guidelines. See Exhibit 17 - OC SAN Engineering Design Guidelines and Standards – Available online at Document Central | Orange County Sanitation District (ocsan.gov) C. The construction cost estimate shall be as described in the Engineering Design Guidelines, Chapter 15 Construction Cost Estimates. 1.5.4 CONSTRUCTION COST ESTIMATE A. The construction cost estimate shall be as described in the Engineering Design Guidelines, Chapter 15 Construction Cost Estimates. PROJECT SCHEDULE 1.6.1 GENERAL A. The table below lists the time frames associated with each major project deliverable and with OC SAN’s review and approval of those deliverables. CONSULTANT shall comply with the deadlines indicated in that table. B. OC SAN’s Project Manager will issue a Preliminary Design NTP. OC SAN’s Project Manager will also issue a Final Design NTP upon OC SAN’s acceptance of the final Preliminary Design Report. C. The time frames specified below are used to estimate the actual milestone dates based on the assumed NTP date, as shown in Exhibit 8 - Project Schedule Calculation. D. OC SAN will consider an alternative CONSULTANT-proposed schedule provided it is consistent with OC SAN resources and schedule constraints and adds value to OC SAN. March 2026 7-63 – Design SOW Page 10 of 41 PROJECT MILESTONE AND DEADLINES MILESTONE DEADLINE Kickoff Meeting The kickoff meeting will be scheduled to coincide with the Preliminary Design NTP. Preliminary Design NTP Submit draft Preliminary Design Report (PDR) 170 workdays from the Preliminary Design NTP. CONSULTANT shall establish a schedule with the OC SAN PM for separately submitting working drafts of each Design Memo for OC SAN review prior to completing the draft PDR. This schedule shall factor in the logical sequence for completing the memos as well as both CONSULTANT and OC SAN resources. OC SAN Review of draft PDR 20 workdays from receipt of Draft PDR Submit final Preliminary Design Report 40 workdays from receipt of OC SAN comments on Draft PDR. Final Design NTP CONSULTANT’s schedule shall allow 15 working days from submittal of the final PDR to receipt of the Design Phase NTP. Submit Design Submittal 1 (DS1) 80 workdays from Design Phase NTP. OC SAN Review of DS1 15 workdays from receipt of DS1 Submit Design Submittal 2 (DS2) 80 workdays from receipt of OC SAN comments on DS1. OC SAN Review of DS2 20 workdays from receipt of DS2 Submit Design Submittal 3 (DS3) 80 workdays from receipt of OC SAN comments on DS2. OC SAN Review of DS3 20 workdays from receipt of DS3 Submit Final Design Submittal (FDS) 40 workdays from receipt of OC SAN comments on DS3. CONSULTANT shall stop work upon submission of DS3, except as required to participate in OC SAN meetings, until receipt of OC SAN comments on DS3. OC SAN Review of FDS 15 workdays from receipt of FDS Final Technical Specifications and Plans 25 workdays from receipt of OC SAN comments on FDS. 2. PHASE 2 – PRELIMINARY DESIGN The preliminary design phase will define the project. The final deliverable of this phase will be a Preliminary Design Report (PDR) with the basis of design for all elements of the project. PRELIMINARY DESIGN EXECUTION 2.0.1 MAJOR DECISIONS A. The CONSULTANT shall plan the resolution of major decisions through the following process: 1. Identify major decisions early and the timing required to prevent impacts to the project schedule. 2. Identity the decision-making method that will be used to gain OC SAN concurrence and provide appropriate opportunities for OC SAN provide input. March 2026 7-63 – Design SOW Page 11 of 41 3. Identify and schedule at the start of the project the workshops, technical design meetings and focused meetings where major decisions will be made and include a list of attendees required. B. These decisions should be tracked on the Decision Log and flagged as a major decision. The Decision Log shall include a column for cost impact. PREDESIGN EVALUTION STUDIES (NOT USED) PRELIMINARY DESIGN PRODUCTION 2.2.1 GENERAL A. Preliminary Design Report (PDR) production involves the preparation of design memos, drawings, calculations, and other supporting material resulting in the PDR. 2.2.2 DESIGN MEMOS A. The CONSULTANT shall produce Design Memos as indicated with a check box below in accordance with Exhibit 1 - Preliminary Design Report Requirements. The CONSULTANT shall discuss the combining of design memos with OC SAN and develop a design memo submittal list. ☐Process Design Configuration ☐Design Configuration ☐Redundancy ☐Monitoring and Sampling ☐Process Flow Diagrams ☐Operating Philosophies ☐Site and Facility Layouts ☐Preliminary Load Criticality Ranking Table ☒Hydraulic Analysis ☒Static Analysis ☒Dynamic Analysis ☒ Dry Weather Calibration ☒ Wet Weather Calibration ☒ Design Storm Choice Sensitivity Analysis ☐Hydraulic Profile ☒Demolition ☒Describe Demolition Requirements ☒Demolition List ☒Demolition Plans ☒ Demo EID ☒Rehabilitation Requirements ☐Geotechnical Data Report ☐Review of Existing Data - Preliminary Geotechnical Report ☐Geotechnical Data Report and Recommendations ☒Civil Design Parameters ☒General Civil ☐Pavement Requirements ☐Drainage Requirements ☐Corrosion Protection Requirements ☐Utility Requirements ☒Structural Design Parameters ☐Architectural Design Parameters March 2026 7-63 – Design SOW Page 12 of 41 ☒Process Mechanical Design Parameters ☐Building Mechanical Design Parameters ☐Fire Protection ☐Fire Protection Requirements ☐Fire Water Flow Analysis ☐Fire Protection Requirements for Existing Facilities ☒Electrical ☒Codes/standards. Brief description of electrical system. Electrical drawings. ☐Identify Electrical System Impacts ☐Report – Data Collection and Verification ☒Preliminary Load List ☒Preliminary Standby Power Requirements ☐ETAP – Preliminary Short Circuit Analysis and Load Flow/Voltage Drop Studies ☐ETAP – Provide Data. OC SAN will perform ETAP studies. ☐Preliminary Analysis for cable pull calcs, ductbank cable derating, cable tray fill calcs. ☒Hazardous Area Classification Requirements ☒Instrumentation and Control ☒Instrumentation and Control System ☒DCS Server Requirements ☒Preliminary Real IO List ☒PLC and RIO Panel Location Map ☒CCTV Coverage Map ☐Landscaping ☐Landscaping Requirements ☐Develop up to three alternative concepts for review and acceptance ☐Plant Utility Investigation Findings ☒Vibration Analysis ☒Collections Basis of Design ☒Codes and Standards ☐Pipeline Basis of Design ☐Manhole Basis of Design ☒Collections Rehabilitation Alternatives ☒Wet Well Rehabilitation ☐Manhole Rehabilitation ☐Collections Pipeline Design Assume 3 viable alignment options ☐Design Memo Items 1-12 ☐Open-cut vs. Trenchless Technologies ☐Trenchless Technologies at Major Closings ☐Collections Utility Investigation Findings ☒Collections Conceptual Traffic Control ☒AHJ and Traffic Control Identification ☒Basis for Traffic Control Strategy ☐Traffic Analysis ☒Traffic Control Plans ☒Design Safety Requirements ☒Design Safety Requirements ☒Identify all potential project specific safety issues ☒Identify all potential Cal OSHA and OC SAN safety issues ☒Identify construction safety hazards March 2026 7-63 – Design SOW Page 13 of 41 ☒Project Safety Checklist (Exhibit 11) and Full Project Safety Review Plan (Exhibit 12) to verify safety elements ☐HAZOP ☒Public Impacts ☒Environmental and Regulatory Requirements ☒CEQA Part of Programmatic EIR ☐Determine project environmental and regulatory requirements ☐Matrix of CEQA and Permit Requirements ☐Mitigation, Monitoring and Reporting List ☒Permit Requirements ☒List of Permits Required ☐Oil Well Abandonment ☐Stormwater Requirements ☐Hazardous Material Survey, Mitigation and Control ☒Maintainability ☒Define Maintainability Requirements ☒Maintainability Requirements Plan Drawings ☒Define Maintainability Rules ☐Define Maintainability Information for Project Specific Equipment ☒Facility Operation and Maintenance ☒Facility O&M Requirements ☒Operating Philosophies ☐Preliminary Assessment of O&M Staffing Requirements ☒Implementation Plan ☒Identification of Adjacent Projects ☒Preliminary Commissioning Checklist ☒Preliminary Construction Sequencing Plan ☒Review of Constructability Issues ☒Temporary Handling of Flow ☒Construction Odor Monitoring and Mitigation ☒Preliminary Technical Specification List 2.2.3 PRELIMINARY DESIGN DRAWINGS A. The CONSULTANT shall produce the following Preliminary Design Report drawings in accordance with Exhibit 1 - Preliminary Design Report Requirements. ☒General ☒Demolition ☒Civil ☐Landscape ☒Structural ☐Architectural ☒Mechanical ☒Electrical ☒Instrumentation and Control 2.2.4 PRELIMINARY DESIGN REPORT (PDR) PRODUCTION, CONTENTS AND ORGANIZATION A. Preliminary Design Report (PDR) Production involves the preparation of design memos, drawings, calculations, and other supporting material resulting in the PDR. March 2026 7-63 – Design SOW Page 14 of 41 B. The CONSULTANT shall combine the materials described below into a draft PDR. The PDR shall be structured as outlined below, with the contents corresponding to the tasks listed in this Scope of Work. Volume 1 – Preliminary Design Report Technical Memos Executive Summary Design Memos Design Memo 1, 2, 3, etc. List of Proposed Specification Sections Volume 2 – Drawings (see Preliminary Design Drawings list below) Volume 3 – Submittal Documentation Calculations Equipment Data & Catalog Cuts Decision Log Meeting Minutes Exhibit 11 - Project Safety Checklist Exhibit 12 – Full Project Safety Review Plan C. The Executive Summary shall summarize the conclusions of the Memos included in the report and specifically include a summary construction schedule and construction cost estimate. D. The draft PDR and final PDR shall be submitted in searchable PDF format legible on-screen and as a hard copy. The number of hard copies is indicated in Exhibit 9 - Deliverables Quantities. The labeling and organization of the PDF submittal shall be in accordance with Exhibit 14 - Bluebeam Designer Training for Submission. E. Each evaluation memo and design memo shall be a separate file. F. The OC SAN Project Manager may request that the CONSULTANT submit an electronic proof set of the Draft PDR and Final PDR prior to hard copy production in order to initially confirm that the submittal is ready for printing. 2.2.5 PRELIMINARY DESIGN COST ESTIMATE A. The CONSULTANT shall provide a cost estimate for the associated PDR submittal per Engineering Design Guidelines, Chapter 15 Construction Cost Estimates. PRELIMINARY DESIGN ACTIVITIES The following services shall be provided by the CONSULTANT or an appropriately qualified Subconsultant. In any case, the CONSULTANT shall be responsible for managing all subconsultants, including reviewing their work products prior to submission to OC SAN. 2.3.1 HAZARDOUS AREA DE-CLASSIFICATION APPROACH A. The CONSULTANT shall evaluate the existing ventilation to the pump and electrical rooms and determine the ventilation needed to declassify the electrical room per NFPA 820. Include recommendations in the Electrical Design Memo. 2.3.2 WATERPROOFING APPROACH A. Determine a waterproofing system for the pump room based on the structure design life, constructability, and cost benefit. Include recommendations in the Structural Design Memo. 2.3.3 DCS SERVER INSTALLATION REQUIREMENTS AND APPROACH A. The CONSULTANT shall review the environmental and electrical requirements for the DCS servers and determine an installation method suitable for the location. The appropriate enclosure will need to have front and rear access from the floor. Clearances on the backside of the DCS server do not need to meet the OC SAN Engineering Design Guidelines Electrical Design Criteria minimum clearance requirement so long as operations staff are able to access the rear of the DCS server. Some server racks can be pulled out and March 2026 7-63 – Design SOW Page 15 of 41 rotated, allowing access to the back, which is acceptable for the new DCS server design. The servers will have redundant power supplies which shall be fed from separately derived sources, with one source being UPS. Power quality will need to be evaluated, and conditioning provided as needed. The appropriate enclosure will have at least 25% of spare rack space for future equipment and capable of supporting those additional loading requirements. 2.3.4 EQUIPMENT ARRANGEMENT A. CONSULTANT shall evaluate the equipment arrangement at the pump station. This includes ensuring accessibility for operating and maintaining equipment and ensure adequate working spaces. 2.3.5 IMPLEMENTATION PLAN AND CONSTRUCTION SEQUENCING A. CONSULTANT shall prepare an implementation plan with construction sequencing. This includes identifying temporary facilities that will be required, and the means to operate them, during construction. 2.3.6 EASEMENTS, PROPERTY BOUNDARIES AND WORK AREA LIMITS A. The CONSULTANT shall identify easement and property boundary requirements based on available record drawings and the survey/mapping information from Project 7-68 as well as the City of Newport Beach MacArthur Blvd Final Street Improvement plans provided to the CONSULTANT. Unless otherwise directed, the CONSULTANT shall identify, and show all property boundaries, and all existing and proposed easements, within and/or adjacent to the project boundaries. B. CONSULTANT shall show and explicitly identify the limits of work for all portions of the project, including any restrictions to the work allowed in any area, e.g., whether the area can be used for parking or laydown. 2.3.7 TOPOGRAPHIC SURVEY A. OC SAN will provide the survey information from Project 7-68 as well as the City of Newport Beach MacArthur Blvd Final Street Improvement plans to the CONSULTANT for use on the project. B. The basis of bearings and benchmarks shall be indicated on the drawings. Control shall reference the Coordinate System and datum per OC SAN CAD STANDARDS MANUAL (CAD Manual), latest edition. CONSULTANT’s project schedule shall account for the above. C. Control Surveys for Collection Systems 1. Base Map: The base map index contours shall be spaced at five feet (5’) vertically and the immediate contours shall be spaced at one-foot (1’) contour intervals. The mapping shall include digital topographic mapping. The digital format shall be compatible with OC SAN Graphic Information System (GIS). All surface features, including those hidden from aerial view shall be incorporated into the digital mapping. 2. Plan and Profile Sheets: CONSULTANT shall prepare plan and profile sheets based upon the aerial mapping. The scale for plan and profile sheets shall be one inch equals forty feet (1” = 40’) horizontal and one inch equals four feet (1” = 4’) vertical. An aerial photographic (photo strip) with the alignment shall be included. The plan view shall be separate from the photo strip. Intersections shall be adequately detailed at a scale of one inch equals ten feet (1” = 10’) or one inch equals twenty feet (1” = 20’). Manholes and other details shall be drawn at a scale that is adequate to provide clarity and sufficient detail for construction. The pump station construction drawings shall be drafted at scales of 1/8” = 1’ to 1” = 20’, as adequate, to allow for sufficient detail to be shown. The basis of bearings and benchmarks shall be indicated on the drawings. 2.3.8 TRAFFIC CONTROL SERVICES March 2026 7-63 – Design SOW Page 16 of 41 A. CONSULTANT shall secure the services of a Subconsultant to determine the traffic control requirements and assist corresponding subconsultants in obtaining approval from the City of Newport Beach. 2.3.9 UTILITY INVESTIGATION A. To better manage the risks associated with construction excavation, CONSULTANT shall perform a thorough search of all utilities impacted by the work for all applicable Project Elements of this Scope of Work, regardless of size and all other facilities above or below ground. Utilities include all utility company-owned and public agency-owned piping, duct banks, and other interferences. The search shall include utilities within the public right-of-way, and those located on private property and OC SAN property impacted by the proposed project. The search shall include the records and plans of OC SAN and all respective public and private companies and utilities. B. Review of OC SAN Records 1. OC SAN’s “As-built/Record” plans may be incomplete or inaccurate with respect to the routing of individual utilities, pipelines, etc. in the vicinity of the project. CONSULTANT shall check OC SAN records against those of the other agencies, companies and utilities. These may include, but not be limited to, oil, gas, fuel, water, and sewer pipelines; traffic control facilities, telephone and electrical conduit and duct banks, storm drains, manholes, and other structures. C. Review of Outside Agency Records 1. CONSULTANT shall contact, in writing, all jurisdictional agencies and utility owners to inform them of OC SAN’s project. CONSULTANT shall request plans showing all the agency’s or utility’s facilities, pipelines, etc. in the project area. CONSULTANT shall also request plans and schedules for all proposed construction in the project areas. CONSULTANT shall develop a schedule to minimize project conflicts and/or coordinate OC SAN projects with local agencies. 2. CONSULTANT shall personally visit each agency/company and search through all available plans, files, and documents. CONSULTANT shall meet with applicable field staff from each agency to confirm the completeness of their research. Abandoned utilities shall also be considered. 3. CONSULTANT shall document the contacts and information requested and received, including that from Underground Service Alert (USA). OC SAN shall be copied on all correspondence between CONSULTANT and public and private agencies, and utility companies. CONSULTANT shall submit a copy of all documentation to OC SAN with an itemized submittal letter. CONSULTANT’s Project Manager shall sign the transmittal cover letter, and the cover letter shall confirm that CONSULTANT has sent a representative to each agency/company/utility, performed on-site inspections for each utility, and has listed the utilities. 4. CONSULTANT shall contact USA and request a Substructure listing for the project area. D. On-Site Inspection 1. An on-site inspection shall be conducted in the project area. During the on-site inspection, a senior-level CONSULTANT representative shall walk the site accompanied by OC SAN’s Project Engineer and Supervising Inspector. The CONSULTANT representative shall be experienced in the location and identification of utilities in the field. During the on- site inspection the CONSULTANT shall document all visible features that indicate utilities within the project area and compare them with the available utility plans. E. Utilities for Adjacent Properties March 2026 7-63 – Design SOW Page 17 of 41 1. CONSULTANT shall investigate all utilities serving properties adjacent to the work, and submit a spreadsheet at the end of the utility research accounting for all anticipated utilities for OC SAN review, with the following information: a. List all utilities anticipated or each adjacent property. b. Indicate whether or not each such utility was found on as-built drawings of any agency, with an identification of the agencies identifying such utility. c. Indicate whether or not the utility was field located by utility through USA process, and, if so, by which agency. F. Subsurface Utility Investigations 1. Investigation of existing utilities shall be in accordance with the respective ASCE guidelines, except as amended by this Scope of Work. A brief description of the ASCE guidelines defines the Quality Level of detail for researching subsurface utilities as follows: a. Quality Level D: Information derived from existing records or oral recollections. b. Quality Level C: Information obtained by surveying and plotting visible above- ground utility features and by using professional judgment in correlating this information to Quality Level D information. c. Quality Level B: Information obtained through the application of appropriate surface geophysical methods to determine the existence and approximate position of subsurface utilities. Quality Level B data shall be reproducible by surface geophysics, such as ground penetrating radar, at any point of their depiction. This information is surveyed to applicable tolerances and reduced onto plan documents. d. Quality Level A: Precise horizontal and vertical location of utilities obtained by the actual exposure (or verification of previously exposed subsurface and surveyed utilities) and subsequent measurement of subsurface utilities, usually at a specific point. Minimally intrusive excavation equipment is typically used to minimize the potential for utility damage. A precise horizontal and vertical location, as well as other utility attributes, is shown on the plan documents. Accuracy is typically set to 15-mm vertical and to applicable horizontal survey and mapping accuracy. 2. Refer to CI/ASCE 38-22, Standard Guidelines for Collection and Depiction of Existing Subsurface Utility Data for details. 3. CONSULTANT shall determine all utilities impacted by the work for all applicable Project Elements of this Scope of Work. Utilities include utility company-owned, and public agency- owned piping, duct banks, and other interferences. All utilities encountered during the preliminary design shall be shown on the plans. 4. Subsurface investigation for all utilities in and around the work area shall be performed to Quality Level D and Quality Level C. All utilities shall be plotted both in plan and profile on a scaled drawing that can later be incorporated into scaled (1” = 40’) plan drawings. 2.3.10 ENVIRONMENTAL DOCUMENTATION A. CONSULTANT services related to Environmental Documentation may span across Phase 2 – Preliminary Design and Phase 3 - Design. When such services are required, they shall be based on the requirements of Section III – Project Schedule and based on the following requirements. The CONSULTANT shall allocate the budgeted hours between the Environmental Documentation services in Phase 2 and Phase 3 based on when these services will be required. B. CEQA Documentation Support 1. OC SAN expects that a Notice of Exemption (NOE) will be required for this project. OC SAN will separately arrange for preparation of required NOE. March 2026 7-63 – Design SOW Page 18 of 41 2.3.11 PERMITTING ASSISTANCE A. CONSULTANT services related to Permitting Assistance may span across Phase 2 – Preliminary Design and Phase 3 - Design. When such services are required, they will be based on the requirements of Section III – Project Schedule and the schedule constraints associated with each particular permit. The CONSULTANT shall allocate the budgeted hours between the Environmental Documentation services in Phase 2 and Phase 3 based on when these services will be required. B. For all applicable Project Elements of this Scope of Work, CONSULTANT shall provide Bid Documents that ensure that the facility features and the facility performance, and construction procedures comply with all conditions of existing permits and permits required to construct this project. Construction drawings, specifications and supplemental drawings shall be prepared, as necessary, in the format required to obtain all permits. C. CONSULTANT shall assist OC SAN in obtaining permits. This assistance shall include completing application forms provided by OC SAN, preparing supporting documentation for the permit applications as required by the issuing agency, furnishing the required number of copies of all construction drawings and exhibits, and attending meetings with permitting agencies at the request of OC SAN. D. With the exception of construction contractor-furnished permits, OC SAN staff will execute all applications. All permit fees will be paid directly by the OC SAN and will not be part of CONSULTANT’s fee. E. CONSULTANT shall submit all supporting documentation in a timely fashion for all permits required for this project as described below. F. City / County Encroachment Permits 1. City of Newport Beach a. The CONSULTANT shall assume 2 meetings at 2 hours each. G. Stormwater Permitting 1. CONSULTANT shall determine and specify the preliminary Risk Level and Project Type using the California State Water Resources Control Board’s Storm Water Multiple Application and Report Tracking System (SMARTS) based on the R-Factor obtained from US EPA’s online Rainfall Erosivity Factor Calculator for Small Construction Sites. 2. CONSULTANT shall prepare the specification for stormwater using OC SAN’s respective master specification as a starting point. CONSULTANT shall not begin work on editing the specification until OC SAN has approved the CONSULTANT’s preliminary Risk Level and Project Type. 3. It is OC SAN’s intent to design linear underground/overhead projects (LUP) to LUP Type 2 requirements, whenever possible, which is often the most economical approach. CONSULTANT shall coordinate with the OC SAN Project Manager and OC SAN Environmental Compliance Division and edit Stormwater Pollution Prevention Plant specifications accordingly. 2.3.12 PROJECT SAFETY REVIEW A. CONSULTANT shall prepare Exhibit 11 Project Safety Check List and Exhibit 12 – Full Project Safety Review Plan for review with OC SAN Risk Management during the Preliminary Safety Review Plan Workshop. The workshop shall be held at OC SAN offices and no more than 4 hours. (held 4 weeks prior to draft PDR). B. Moderator 1. CONSULTANT shall provide a suitably qualified moderator to conduct the Workshops to review project safety topics contained in Exhibit 11 - Project Safety Check List and March 2026 7-63 – Design SOW Page 19 of 41 Exhibit 12 - Full Project Safety Review Plan. The moderator shall have the following attributes: a. Sufficiently technically knowledgeable to understand the nature of the safety risks involved, but the moderator need not be a subject matter expert. b. Not extensively involved in the project to date, so that the moderator has no personal stake in the issues. CONSULTANT’s Project Manager and Project Engineers for this project are not considered suitable. c. Employed by CONSULTANT, a Subconsultant, or a specific individual. 2.3.13 PROJECT MANAGEMENT A. CONSULTANT shall be responsible for managing CONSULTANT’s project execution, schedule, budget, subconsultants, and coordination with other projects. The CONSULTANT shall perform the project management requirements in accordance with Exhibit 3 - Project Management Requirements with the project specific options identified below. B. Progress Reporting ☐Earned Value Curve and Budget Status Graph ☒Milestone-Based Tracking C. Project Management Plan (PMP): ☒Not required ☐Required ☐PMP approval prior to beginning technical work on the project. D. Project Logs ☒Major Decision Log ☒Project Decision Log ☒Action Item Log ☒Decision Issues Log ☒Meeting Log ☒Risk Register E. Breakdown Structure (WBS) 1. The WBS shall serve as the unified framework for organizing and reporting project work. It will be jointly developed by OC SAN and the CONSULTANT and used for invoicing, monthly progress reporting, scheduling, and earned value management. 2. By establishing this structure collaboratively, OC SAN and the CONSULTANT ensure that all reporting and tracking activities are consistent, comparable, and based on a shared understanding of the project work. 3. The WBS must accommodate the cost codes as shown below F. Progress Report ☐Not required ☒Required G. Project Invoices March 2026 7-63 – Design SOW Page 20 of 41 1. Estimating earned value, tasks shall be further broken down to subtasks of no more than $100,000. 2. Costs for invoicing shall be grouped into the following work packages: Work Package Description Tasks 3146 Preliminary Design All Phase 2 tasks, except those listed above. 3250 CONSULTANT Services During Design Tasks 3.1 through 3.4, and 3.6 through 3.12 3254 Bid Support Services Task 3.5 2.3.14 RISK MANAGEMENT A. CONSULTANT shall provide risk management in accordance with Exhibit 4 – Risk Management Requirements. 2.3.15 QUALITY CONTROL A. The CONSULTANT shall provide quality control requirements in accordance with Exhibit 6 - Quality Control Requirements. PDR WORKSHOPS AND MEETINGS 2.4.1 GENERAL A. Workshop and meeting planning, requirements, agendas, and meeting minutes shall be in accordance with Exhibit 5 - Workshop and Meeting Requirements. 2.4.2 PDR PRODUCTION WORKSHOPS A. Predesign Kickoff Workshop 1. A two-hour project kick-off meeting shall be held with OC SAN staff to introduce principal members of OC SAN and CONSULTANT’s teams. The discussion topics shall include OC SAN responsibilities, CONSULTANT’s responsibilities, invoice procedures, personnel badges, parking, site access, CONSULTANT’s Scope of Work, detailed project schedule with milestones, Work Breakdown Structure requirements, and project safety requirements. B. PDR Production Workshops shall be held during Preliminary Design to review project progress during PDR Production. The subjects to be covered in each workshop are discussed below. Each workshop shall be 2 hours in length. C. PDR Production Workshops shall be held during Preliminary Design to review the topics listed below. The list below also indicates the number of workshops to be held to cover the specific topic. Unless otherwise noted, each workshop shall be 2 hours in length. March 2026 7-63 – Design SOW Page 21 of 41 PDR PRODUCTION WORKSHOPS TOPIC NUMBER OF WORKSHOPS PDR Production Workshops: Hydraulic Analysis and Mechanical Process Design 1 Electrical, Hazardous Area Classification, Instrumentation, and Control 3 Maintainability, Facilities Operation and Maintenance, and Vibration Analysis 1 Hazardous Materials, Design Safety Requirements, Permit Requirements and Traffic Control 1 Environmental, Stormwater, Public Impacts and Regulatory Requirements 1 Implementation Plan and Construction Sequencing 1 2.4.3 DESIGN MEMO WORKSHOPS A. CONSULTANT shall hold workshops to present and review the Design Memos as required in Exhibit 5 - Workshop and Meeting Requirements. 2.4.4 PDR REVIEW WORKSHOPS A. CONSULTANT shall hold the following workshops to review the draft Preliminary Design Report as required in Exhibit 5 - Workshop and Meeting Requirements: 1. Draft PDR Presentation Workshop 2. Draft PDR Review Workshop 3. PDR Validation Workshop 2.4.5 MAINTAINABILITY WORKSHOPS A. A maintainability workshop shall be held after draft floor plans have been developed to: 1. Review the working space around equipment, accessibility requirements, specific activities required to be performed by maintenance staff, ease of servicing for equipment and devices, means to removing equipment from the point of installation to a location outside the facility, pump placement, and vibration minimization. 2. The workshop shall be used to develop a set of project maintainability design rules based on the requirements in Chapter 7 of the Engineering Design Guidelines, coordination with OC SAN staff, lessons learned from prior projects, CONSULTANT staff expertise, and manufacturer data. 3. The CONSULTANT shall research and provide the following maintainability information for the workshop: a. Main sewage pumps b. Operations and Maintenance (O&M) staff including staff from Maintenance Reliability and Planning must be involved in the establishment of the maintainability design rules. B. The maintainability workshop shall be held at OC SAN’s facilities and shall generally be 2 hours in length. OC SAN and CONSULTANT staff shall attend this workshop. March 2026 7-63 – Design SOW Page 22 of 41 C. A follow up maintainability workshop shall be held at OC SAN’s facilities to review the draft project maintainability design rules. D. The project maintainability design rules shall be followed during detailed design. E. CONSULTANT shall be responsible for completing the following tasks relative to the workshop: 1. Prepare package for the maintainability workshop participants. The package shall consist of plans, process flow diagrams, P&IDs and other information selected by CONSULTANT. 2. Prepare presentation on the project. 3. Review 3D model if applicable to the project. 4. Summarize the maintainability review workshop comments and action taken on each comment in a memorandum. 5. All comments and recommendations of the workshop and the project maintainability design rules shall be incorporated into the Maintainability Design Memo and the bid documents. 2.4.6 TECHNICAL PROGRESS MEETINGS A. Technical Progress Meetings shall be held every 4 weeks to review various issues with OC SAN’s project team. A total of 12 meetings shall be held during the Preliminary Design Phase. The CONSULTANT shall coordinate with the OC SAN Project Manager to determine what topics will be covered in what meetings, and what OC SAN and CONSULTANT team members are required for each. Assume CONSULTANT Project Manager and Project Engineer will attend every progress meeting. 2.4.7 FOCUSED MEETINGS A. Focused meetings shall be held throughout preliminary design to discuss specific issues in detail and generate comments and direction from OC SAN staff. The following tentative list of topics may be covered in these meetings: 1. Quality control plan 2. Permits 3. OC SAN Contractor Safety Standards and other safety requirements 4. City of Newport Beach requirements 5. Instrumentation and control upgrades 6. DCS server and cabinet requirements 7. Sample P&ID; basis for equipment tag numbering 8. Sample control descriptions 9. Sample EID database 10. Sample Real IO List database 11. Data network block diagram/network connection diagram 12. I/O relocation plan 13. Electrical distribution system, system controls and the related upgrades 14. Single-line diagrams and electrical demolition 15. Construction sequencing 16. Coordination with other projects March 2026 7-63 – Design SOW Page 23 of 41 B. Meeting lengths shall be as required to cover the topic in question. Depending on subject matter and attendees, one meeting may cover multiple subjects. CONSULTANT shall determine how many meetings will be needed to cover these topics. CONSULTANT may suggest additional topics as necessary. Supplementary meetings may be scheduled with OC SAN staff, as necessary to allow coordination between CONSULTANT and OC SAN staff. 2.4.8 COORDINATION WITH OTHER PROJECTS MEETINGS A. The project shall be a complete and fully functional facility that is integrated with existing facilities and coordinated with other construction projects. CONSULTANT shall coordinate potential conflicts with the following adjacent projects and participate in the number of meetings indicated in the following table: PROJECT COORDINATION MEETINGS PROJECT PROJECT DESCRIPTION COORDINATION MEETINGS City of Newport Beach Paving Project Paving of MacArthur Blvd 2 meetings @ 2 hours 2.4.9 STORMWATER COMPLIANCE MEETING A. A formal meeting shall be held with OC SAN’s stormwater compliance staff to review the project scope and identify all issues during and after construction affecting compliance with stormwater regulatory requirements and OC SAN’s policies and practices. 3. PHASE 3 – DESIGN BID DOCUMENTS 3.0.1 GENERAL A. CONSULTANT shall provide engineering services to prepare biddable plans, technical specifications, and other Bid Documents as required based on the design concepts and criteria developed during Phase 2 – Preliminary Design. In this Scope of Work, construction documents include specifications; drawings; cable, conduit and cable tray schedules; commissioning plan materials; equipment and instrumentation database (EID); Real IO List; and bypassing plans. 3.0.2 ENGINEERING DESIGN GUIDELINE UPDATES A. All changes in OC SAN’s Engineering Standards, OC SAN’s Design Guidelines, and/or changes in design concepts and facility layouts as a result of OC SAN comments that may occur up to transmittal of OC SAN comments on Design Submittal 2, a be incorporated into the Design by CONSULTANT with no increase in CONSULTANT’s Not-to-Exceed upper limit on fees. 3.0.3 GENERAL REQUIREMENTS AND ADDITIONAL GENERAL REQUIREMENTS A. The following are the minimum Additional GRs topics required for this project: ☒Summary of Work ☒Work Sequence ☒Work Restrictions ☒Permits ☒Environmental Restrictions and Controls ☒Measurement and Payment (includes Mobilization/Demobilization) ☒Shipping, Storage and Handling ☒Project Control Management System (PMWeb construction management software) ☒Equipment Service Manuals ☒Equipment and Instrument Database (EID) ☒Commissioning March 2026 7-63 – Design SOW Page 24 of 41 ☒Training of OC SAN Personnel ☒Hazardous Materials Mitigation and Controls ☒Traffic Control 3.0.4 DESIGN SUBMITTALS A. The CONSULTANT shall produce the following design submittals as indicated below in accordance with Exhibit 2 - Design Requirements. If a design submittal is eliminated, then the design submittal shall include the requirements associated with the required design submittal along with the requirements associated with the previous unchecked design submittals. ☒Design Submittal 1 ☒Design Submittal 2 ☒Design Submittal 3 ☒Final Design Submittal ☒Final Technical Plans and Specifications B. Continuing Work After Design Submittal Submission ☒CONSULTANT is expected to continue design work on the project while OC SAN staff reviews Design Submittal 1 and Design Submittal 2. For Design Submittal 3, CONSULTANT shall stop all design work until receipt of OC SAN comments on that submittal. ☐CONSULTANT is expected to stop design work on the project until OC SAN staff completes the review of each Design Submittal. 3.0.5 CABLE AND CONDUIT SCHEDULE ☒CONSULTANT shall put the cable and raceway schedule on the drawings. CONSULTANT may utilize an Excel spreadsheet and copy the spreadsheet onto the drawings. ☐CONSULTANT shall utilize OC SAN’s Microsoft Access Cable and Raceway Schedule database electronic format. See exhibit titled “Cable Conduit and Tray Schedule Database”. 3.0.6 COMMISSIONING PLAN MATERIALS A. The CONSULTANT shall provide a commissioning plan materials in accordance Exhibit 2 - Design Requirements. B. Specification Section 01810, Commissioning and Specification Section 01810, Attachment A Commissioning Procedures ☐OC SAN will prepare Section 01810 ☒CONSULTANT shall prepare Section 01810 Attachment A ☒CONSULTANT shall edit Section 01810 C. The CONSULTANT shall provide a commissioning plan FAT Narrative in accordance Exhibit 2 - Design Requirements. ☒CONSULTANT shall prepare FAT Narrative/Commissioning Plan (for all Systems) D. ORT Procedures ☐OC SAN will prepare ORT procedures for standard templates ☒CONSULTANT shall prepare ORT procedures using OC SAN’s ORT procedure generator ☐CONSULTANT shall prepare new ORT procedures (not in standard templates) E. Pre-FAT Procedures ☐Pre-FAT procedures not required ☐OC SAN will prepare Pre-FAT procedures ☒CONSULTANT shall prepare Pre-FAT procedures March 2026 7-63 – Design SOW Page 25 of 41 F. FAT Procedures ☐OC SAN will prepare FAT procedures ☒CONSULTANT shall prepare FAT procedures ☒CONSULTANT shall prepare FAT Narratives G. RAT Procedures ☐RAT procedures not required ☐OC SAN will prepare RAT procedures ☒CONSULTANT shall prepare RAT procedures H. PAT Procedures ☒PAT procedures not required ☐OC SAN will prepare PAT procedures ☐CONSULTANT shall prepare PAT procedures 3.0.7 EQUIPMENT AND INSTRUMENTATION DATABASE (EID) ☐EID is not required. ☐OC SAN will develop the EID in accordance Exhibit 2 - Design Requirements. ☒CONSULTANT shall develop EID in accordance Exhibit 2 - Design Requirements. 3.0.8 REAL IO LIST ☐Real IO List is not required. ☐OC SAN will develop the Real IO List in accordance Exhibit 2 - Design Requirements. ☒CONSULTANT shall develop the Real IO List in accordance Exhibit 2 - Design Requirements. 3.0.9 CONSTRUCTION SUBMITTAL ITEMS LIST ☐OC SAN will develop the Construction Submittal Items List in accordance with Exhibit 18 - Project Control Management System. ☒CONSULTANT shall develop the Construction Submittal Items List in accordance with Exhibit 18 - Project Control Management System. 3.0.10 TEMPORARY FACILITIES DURING CONTRUCTION ☐Temporary facilities and bypass pumping are not required. ☐Temporary facilities and bypassing during construction are required, as described under the “Temporary Facilities During Construction” paragraph under the Project Elements, and shall be described in words on the drawings and technical specifications. ☒Detailed plans and work sequence for temporary facilities and bypassing during construction, as described under the “Temporary Facilities During Construction” paragraph under the Project Elements. A. CONSULTANT shall design measures for the temporary handling of flows to be implemented by the Contractor during construction considering OC SAN’s goal of zero sewage spills. B. If existing facilities such as valves, gates, stop logs, etc. are being used for shutdowns or diversions, include a plan for testing those facilities during Phase 3 – Design to verify that they will function adequately for the purpose. If testing cannot be performed, CONSULTANT shall identify the risks associated with using the facility for bypassing, along with contingency plans and mitigation measures to be implemented if they are found not function adequately during construction. March 2026 7-63 – Design SOW Page 26 of 41 DESIGN SUPPORT DOCUMENTATION 3.1.1 DESIGN SUBMITTAL SUPPORT DOCUMENTATION A. The CONSULTANT shall provide a Design Submittal Support Documentation in accordance Exhibit 2 - Design Requirements. B. Design Information 1. CONSULTANT shall include the following material with each Design Submittal: a. CONSULTANT shall maintain the Project Logs specified under Phase 2 Project Management through Phase 3. Current copies of all logs shall be included with each Design Submittal. b. Written response log to OC SAN comments on the previous submittal. c. CEQA and Regulatory Compliance Matrix. This matrix shall list each applicable CEQA mitigation requirement and all known permit requirements with the corresponding description of how each requirement is to be satisfied. Measures to satisfy requirements might be in the GRs, Additional GRs, particular specification requirements, or actions taken separately from the construction contract. d. Calculations e. Proposed list of suppliers to be named in the specifications for major equipment f. Draft or final Fire Protection Reports not submitted in the previous submittal and those revised since the previous submittal. g. Draft or final Field Findings Reports not submitted in the previous submittal and those revised since the previous submittal. h. Equipment data sheets i. Equipment catalog cuts and vendor quotations. j. Commissioning Package List: The Preliminary Commissioning Package List first developed in the PDR Production Phase shall be updated in each Design Submittal and used as a starting point to develop the list of commissioning procedures. k. All memos that may have been prepared since the previous submittal was delivered. C. Facility Operation and Maintenance ☐Not required. ☒Update operating philosophies ☐Update estimates of Operation and Maintenance staffing requirements D. Electrical Design Documentation ☐Electrical design documentation is not required. ☐Updated Electrical Load Criticality Table ☐Electrical Analysis Report ☒Load list for all equipment ☒Equipment sizing from three manufacturers for motor control centers, switchgear, transformers and power panels ☒Lighting calculations ☒Standby generator sizing calculations ☒Uninterruptable power supply (UPS) sizing calculations ☐Ductbank cable pulling tension, derating and cable tray fill calculations March 2026 7-63 – Design SOW Page 27 of 41 E. Power System Studies ☐ETAP is not required. ☐Plant ETAP model for the project performed by OC SAN. ☐Plant ETAP model for the project performed by CONSULTANT. ☒Electrical Systems Analysis Report performed by CONSULTANT. 3.1.2 CONSTRUCTION COST ESTIMATE A. The CONSULTANT shall provide a cost estimates for the associated design submittal indicated below in accordance with the Engineering Design Guidelines, Chapter 15 Construction Cost Estimates. ☒ PDR ☒Design Submittal 1 ☒Design Submittal 2 ☒Design Submittal 3 ☒Final Design Submittal ☒Final Technical Plans and Specifications ☒Post-Bid Evaluation 3.1.3 CONSTRUCTION SCHEDULE A. The CONSULTANT shall provide a Preliminary Construction Schedule for the associated design submittal indicated below in accordance with Exhibit 2 - Design Requirements. ☐Construction Schedule is not Required ☒Design Submittal 1 ☒Design Submittal 2 ☒Design Submittal 3 ☒Final Design Submittal 3.1.4 PROCUREMENT ALTERNATIVES A. The CONSULTANT shall recommend the appropriate procurement alternatives as described in Exhibit 2 - Design Requirements. ☒Procurement alternatives not required ☐Procurement alternatives required DESIGN ACTIVITIES The following services shall be provided by the CONSULTANT or an appropriately qualified Subconsultant. In any case, the CONSULTANT shall be responsible for managing all subconsultants, including reviewing their work products prior to submission to OC SAN. 3.2.1 EASEMENTS, PROPERTY BOUNDARIES AND WORK AREA LIMITS A. CONSULTANT services related to Easements, Property Boundaries and Work Area Limits on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will be required. 3.2.2 TOPOGRAPHIC SURVEY A. CONSULTANT services related to Topographic Survey on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will be required. March 2026 7-63 – Design SOW Page 28 of 41 3.2.3 UTILITY INVESTIGATION A. CONSULTANT services related to Utility Investigation on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will be required. B. Final Design Submittal Utility Coordination Reviews 1. During DS3 submittal review, the CONSULTANT shall meet with outside agencies to verify any changes made by agency during the final design period and compare them with the Contract Drawings. CONSULTANT shall follow through with due diligence on utilities that do not participate in the USA program, unknown owner of a facility and/or abandoned utilities. 2. During DS3 submittal review, an on-site inspection shall be made in the project area. During the on-site inspection, a senior-level CONSULTANT representative shall walk the site accompanied by OC SAN’s Project Engineer and Supervising Inspector. The CONSULTANT’s representative shall be experienced in the location and identification of utilities in the field. During the on-site inspection the CONSULTANT shall document all visible features that indicate utilities within the project area and compare them with the Contract Drawings. 3.2.4 FIRE PROTECTION SERVICES A. CONSULTANT shall secure the services of a Subconsultant to determine the fire protection requirements, prepare final plans and specifications for the selected plan and assist OC SAN in obtaining approval from the fire authority. 3.2.5 TRAFFIC CONTROL SERVICES A. CONSULTANT shall determine traffic control requirements and prepare plans and specifications for all construction activities performed within or adjacent to the public ROW. The traffic control plans shall be approved by the AHJ by FDS. Additionally, the Traffic Control designer shall attend City and OC SAN submittal review meetings, workshops, validation meetings and focus meetings, as needed (maximum of 2 meetings with the City of Newport Beach). 3.2.6 PUBLIC RELATIONS A. CONSULTANT services related to Public Relations on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design. The CONSULTANT shall allocate the budgeted hours between the Public Relations services in Phase 2 and Phase 3 based on when these services will be required. 3.2.7 ENVIRONMENTAL DOCUMENTATION A. CONSULTANT services related to Environmental Documentation on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design. The CONSULTANT shall allocate the budgeted hours between the Environmental Documentation services in Phase 2 and Phase 3 based on when these services will be required. 3.2.8 PERMITTING ASSISTANCE A. CONSULTANT services related to Permitting Assistance on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design. CONSULTANT shall allocate the budgeted hours between the Permitting Assistance services in Phase 2 and Phase 3 based on when these services will be required. 3.2.9 PROJECT SAFETY REVIEW March 2026 7-63 – Design SOW Page 29 of 41 A. CONSULTANT shall update Exhibit 11 – Project Safety Check List and Exhibit 12 – Full Project Safety Review Plan for review with OC SAN Risk Management during Project Safety Review Plan Workshops B. Project Safety Workshops: ☐DS1 Project Safety Review Workshop: 1 hour (held during OC SAN’s review of DS1 at OC SAN) ☒DS2 Project Safety Review Workshop: 1 hour (held during OC SAN’s review of DS2 at OC SAN) ☒DS3 Project Safety Review Workshop: 1 hour (held during OC SAN’s review of DS3 at OC SAN) C. Moderator shall be as specified for Phase 2 – Preliminary Design. 3.2.10 PROJECT MANAGEMENT A. CONSULTANT shall be responsible for managing CONSULTANT’s project execution, schedule, budget, subconsultants, and coordination with other projects. CONSULTANT services related to Project Management on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will be required. 3.2.11 RISK MANAGEMENT A. CONSULTANT shall provide risk management in accordance with Exhibit 4 – Risk Management Requirements. 3.2.12 QUALITY CONTROL A. The CONSULTANT shall provide Quality Control requirements in accordance with Exhibit 6 - Quality Control Requirements. ☐Independent Multi-Discipline Design Workshop is not required. ☒Independent Multi-Discipline Design Workshop is required. (minimum duration of one day) DESIGN WORKSHOPS AND MEETINGS 3.3.1 GENERAL A. Workshop and meeting planning, requirements, agendas, and meeting minutes shall be in accordance with Exhibit 5 - Workshop and Meeting Requirements. 3.3.2 DESIGN PHASE WORKSHOPS A. The focus of workshops is to review project progress to date and the technical decisions that have been made in focused meetings. CONSULTANT shall conduct the workshops listed below in Phase 3 – Design for each design submittal, except FDS. The CONSULTANT shall allow the following time for each workshop: DESIGN PHASE WORKSHOPS WORKSHOP TYPE DURATION Design Kickoff Workshop 1 hour Design Review Meetings 1 hour per discipline Design Validation Meeting 2 hours B. The following Design Review Meetings shall include the following topics, as applicable to the project: 1. Electrical 2. I&C 3. Process March 2026 7-63 – Design SOW Page 30 of 41 4. Civil/Yard 5. Construction 6. Maintainability 3.3.3 POST-DS2 CONSTRUCTABILITY WORKSHOP A. A constructability workshop shall be held during the DS2 submittal and shall be a three-day workshop. The constructability review is intended to provide OC SAN with an objective third- party review of the Bid Documents for effectiveness in communicating information to prospective bidders. The review shall determine if the Bid Documents have sufficient information needed to bid and construct the project and avoid misunderstandings and misinterpretations that may lead to conflict, confusion or claims during construction. This review is not a comprehensive plan check, a dimensional check or a value engineering assignment. Further, it is recognized that comments may only be given on the level of detail provided at this level of design. B. Constructability review participants shall include highly experienced individuals from construction companies, OC SAN construction management staff and CONSULTANT construction management staff. Specialty Consultants and discipline engineers may also be included. C. Each constructability review participant shall receive a package at least two weeks in advance. The package shall include plans and specifications, general conditions, the CPM schedule, the construction cost estimate, permits, and other pertinent information. D. The constructability review shall be held on-site. E. Day 1 shall start with a site visit, for the reviewers to acquaint themselves with the site conditions. After the site visit, the CONSULTANT shall make a short presentation, followed by a question and answer period. This is anticipated to take about 1/2 day. The second half of Day 1, Day 2, and the first half of day three shall be individual workdays for the Constructability Review Team. The CONSULTANT shall not attend, although one designated individual from the CONSULTANT’s Design Team shall remain to answer questions and gather additional information that the Constructability Review Team might need. F. On the afternoon of Day 3, the CONSULTANT shall return and listen to comments from the Constructability Review Team. A designated individual shall record the comments, and take notes from the workshop, to document the process. G. Topics the Constructability Review Team must consider shall include: 1. Project consistency, discrepancies, and constructability issues 2. Contradictions, bid package strategies, and biddability issues 3. Power outages and equipment shutdowns 4. Size critical equipment requirements and constraints 5. Utility company requirements 6. Construction methods and mitigating impacts 7. Viability of equipment relocation 8. Operational requirements 9. Interim Control Plan 10. Access for maintenance 11. Access to make proper connections 12. User-friendliness and safety 13. Coordination with other projects March 2026 7-63 – Design SOW Page 31 of 41 14. Draft Commissioning Plan 15. Public nuisance issues 16. Risk sharing 17. Construction sequencing and schedule, materials storage and work zone accessibility 18. Clarity of the Scope of Work, and interface activities 19. Impacts on existing operation 20. Access 21. Cost control 22. Partnering with Contractor 23. Other local conditions and constraints H. The Constructability Review Team shall provide a list of comments, and the CONSULTANT shall respond to each comment, selecting those comments to be included in the final plans and specifications. I. To facilitate the Constructability Review Workshop, CONSULTANT shall complete the following tasks: 1. Prepare package for constructability review participants. The package shall consist of detailed plans and specifications and other information selected by CONSULTANT. The package shall be mailed to participants at least one week prior to the workshop. 2. Provide for a constructability review facilitator. 3. Prepare presentation on the project for the Constructability Review Team. 4. Meet with Constructability Review Team to receive comments. 5. Provide listing of constructability review comments and action taken on each comment. (The summary report of constructability review comments shall be prepared by the Constructability Review Team.) J. All comments and recommendations of the workshop shall be incorporated into the Bid Documents at no additional cost to OC SAN. K. Prior to DS3, the Constructability Review Team shall also conduct an additional constructability review of the final Bid Documents to review clarity of the bid package, project completeness, and other issues, as necessary. 3.3.4 DESIGN PHASE MEETINGS A. Technical Progress Meetings 1. Technical Progress Meetings shall be held every 4 weeks for 1 hour to review various issues with OC SAN’s project team. The CONSULTANT shall coordinate with the OC SAN Project Manager to determine what topics will be covered in what meetings, and what OC SAN and CONSULTANT team members are required for each. B. Focused Meetings 1. Focused meetings shall be held throughout preliminary design to discuss specific issues in detail and generate comments and direction from OC SAN staff. The following tentative list of topics may be covered in these meetings: a. Cost Estimate Review b. Quality control plan c. Process Flow diagram/Operating Philosophy (several meetings as needed) March 2026 7-63 – Design SOW Page 32 of 41 d. Permits e. OC SAN Contractor Safety Standards and other safety requirements f. Control concepts g. Instrumentation and control upgrades h. Sample P&ID; basis for equipment tag numbering i. Sample control descriptions j. Sample EID database k. Sample Real IO List database l. Data network block diagram/network connection diagram m. I/O relocation plan n. Electrical distribution system, system controls and the related upgrades o. Single-line diagrams and electrical demolition p. Criticality table update q. Construction sequencing 2. Each meeting shall generally be 1 hour in length. CONSULTANT shall determine how many meetings will be needed to cover these topics. CONSULTANT may suggest additional topics as necessary. Supplementary meetings may be scheduled with OC SAN staff, as necessary to allow coordination between the CONSULTANT and OC SAN staff. 3.3.5 CONSULTANT OFFICE TECHNICAL MEETINGS (COTMS) A. OC SAN has found it mutually beneficial to visit the CONSULTANT offices from time to time to observe the detailed design in process, answer detailed technical questions, and establish lines of communications with CONSULTANT staff. During the Design Phase, CONSULTANT shall arrange for OC SAN staff to meet in CONSULTANT’s work center and audit “over the shoulder” design reviews with CONSULTANT’s staff. The reviews will be monitored by a member of the CONSULTANT’s Management Team. Signification decisions will be reported to Consultants Project Manager and OC SAN’s Project Manager and logged into the Decision Log. Action items will be identified. B. The CONSULTANT shall schedule, at a minimum, the following CONSULTANT Office Technical Meetings (COTMs): 1. Three two-hour visits – one between each design submittal. C. The CONSULTANT shall schedule each of the above COTMs and shall coordinate with OC SAN’s Project Manager to be sure the correct personnel participate in the meetings. The CONSULTANT may propose additional, eliminate, or combine COTMs as needed to support the detailed design. D. OC SAN may also request additional “over the shoulder” design review meetings to audit the design in other areas not listed above. 3.3.6 COORDINATION WITH OTHER PROJECTS MEETINGS A. The project shall be a complete and fully functional facility that is integrated with existing facilities and coordinated with other construction projects. CONSULTANT shall coordinate potential conflicts with the following adjacent projects and participate in the number of meetings indicated in the following table: March 2026 7-63 – Design SOW Page 33 of 41 PROJECT COORDINATION MEETINGS PROJECT PROJECT DESCRIPTION COORDINATION MEETINGS City of Newport Beach Paving Project Paving of MacArthur Boulevard 2 meetings @ 2 hours March 2026 7-63 – Design SOW Page 34 of 41 3.3.7 COMMISSIONING TEAM MEETINGS A. Design phase commissioning team meetings shall be held on a monthly basis after completion of OC SAN’s review DS1. B. Meetings will generally be 2-4 hours in length. CONSULTANT shall determine how many meetings shall be needed to cover these topics and organize the topics accordingly. CONSULTANT may suggest additional topics as necessary. Supplementary meetings may be scheduled with OC SAN staff, as necessary, to allow coordination between CONSULTANT and OC SAN staff. C. The Commissioning Team meetings shall cover the following subjects: 1. Provide a detailed review of the proposed construction sequencing plan and make recommendations for improvements. These recommendations shall be incorporated into the plans and specifications as appropriate. Possible incentives for the Contractor to finish the project early shall be explored. 2. Identify procedures, testing requirements and sequencing for commissioning. 3. Develop a detailed outline of a commissioning plan based on the results of the recommended construction sequencing plan. 4. Prepare testing requirements and plan to prove process performance relative to design criteria developed in the PDR. Testing shall be performed after the RAT and supervised by the CONSULTANT. 5. Identify timing within the construction contract schedule when commissioning activities are required, including hold points for testing and inspection. 6. Identify roles and responsibilities of the Project Manager, Resident Engineer, Inspector, Project Engineer, PCI, Engineering support, Design CONSULTANT and Contractor. 7. Develop a timeline of commissioning 8. Develop a commissioning specification 9. Develop standard forms for testing and commissioning documentation 10. Electrical, mechanical and process tie-ins 11. Startup requirements and testing 12. O&M training 3.3.8 PROJECT SAFETY A. CONSULTANT shall prepare and meet with OC SAN Risk Management personnel at PDR to review Exhibit 11 Project Safety Checklist and Exhibit 12 Full Project Safety Review Plan. B. CONSULTANT shall update Exhibits 11 and 12 throughout the design phases. CONSULTANT shall provide OC SAN Risk Management with the final copies of Exhibit 11 and Exhibit 12 at completion of the Design Project. 3.3.9 CONSTRUCTION SUBMITTAL ITEMS LIST MEETING A. Meet with OC SAN between DS2 and DS3 to review the CONSULTANT’s approach to developing the project Construction Submittal Items List using Exhibit 18 – Project Control Management System and the CONSULTANT-provided specifications and discuss the grouping of submittals in commissioning packages and phases. March 2026 7-63 – Design SOW Page 35 of 41 3.3.10 STORMWATER COMPLIANCE MEETING A. A formal meeting shall be held with OC SAN’s stormwater compliance staff to review the project scope and identify all issues during and after construction affecting compliance with stormwater regulatory requirements and OC SAN’s policies and practices. BID PHASE SUPPORT SERVICES 3.4.1 BID PHASE SUPPORT SERVICES A. CONSULTANT shall provide the following bid period services: 1. Participate in the pre-bid meeting. 2. Prepare project drawing set and project specification addenda to provide clarification and resolve errors and omissions identified prior to bid opening. 3. Identify cost impacts associated with addenda changes. 3.4.2 BID EVALUATION ASSISTANCE A. Participate in reviewing alternate equipment proposals from the Contractor, if applicable. B. Participate in the evaluation of the submitted bids, furnish consultation and advice to OC SAN staff and assist with all the related equipment, cost, and other analyses as required to finalize the award decision. C. If the lowest bidder exceeds the engineer’s estimate by 10%, the CONSULTANT is required to conduct a confidential bid evaluation within two weeks from the bid due date. This evaluation shall include a detailed analysis of the deviation, providing reasons for the variance. 3.4.3 CONFORMED DOCUMENT PREPARATION A. Within two weeks of the bid date, prepare conformed documents set (drawings, databases, specifications and other required materials) that incorporates the addenda. See Engineering Design Guidelines, Chapter 01, Design Guidelines – General Requirements, Section 01.5 “Preparation of Project Deliverables” for requirements as modified in Section 8 of this Scope of Work, “Project-Specific Deviations from OC SAN Design Guidelines” and the requirements of the CAD Manual). 4. PHASE 4 – CONSTRUCTION AND INSTALLATION SERVICES Not in this Scope of Work. 5. PHASE 5 – COMMISSIONING SERVICES Not in this Scope of Work. 6. PHASE 6 – CLOSE OUT Not in this Scope of Work. 7. GENERAL REQUIREMENTS GENERAL 7.0.1 OC SAN ENGINEERING DESIGN GUIDELINES AND STRATEGIC PLAN A. CONSULTANT shall refer to and adhere to the requirements of OC SAN Contractor Safety Standards, OC SAN Engineering Design Guidelines, any deviations to the Engineering Design Guidelines listed below, and other OC SAN’s Design Standards referenced therein. Exhibit 16 - Spec Review using Microsoft Word and Teams March 2026 7-63 – Design SOW Page 36 of 41 B. Exhibit 17 - OC SAN Engineering Design Guidelines and Standards – Available online at https://www.ocsan.gov/document-center/ is a complete set of the OC SAN Contractor Safety Standards and OC SAN Design Standards, the latest edition at the time of the design proposal stage. C. The Engineering Guidelines define what plant design concepts/tools/methods and project management requirements shall be adhered to and in what manner they shall be used/provided by Consultants, e.g., requirements regarding design concepts, submittals, documentation details, use of OC SAN Master Specifications, and other related OC SAN Standards, etc. D. Refer also to Section “CONSULTANT’s Responsibilities” in OC SAN Engineering Design Guidelines Chapter 01. Refer to “Master Specifications Instructions for Use” that mandates rules and conventions to be used in all OC SAN project specifications. E. The project Scope of Work defines whether or not each specific deliverable described in the Guidelines shall be part of the project and when each task shall take place. F. The project Scope of Work also includes requirements that supplement and/or modify the Guidelines requirements for this project. G. The project Scope of Work and OC SAN Engineering Design Guidelines impact CONSULTANT’s project cost. H. Except as specified in this Scope of Work, design of all facilities shall conform to the recommendations of the currently approved Master Plan for OC SAN facilities. The project shall also incorporate all applicable mitigation measures included in associated environmental documents and site-specific local requirements. I. In addition, OC SAN will require the CONSULTANT to follow subsequent revisions of OC SAN Contractor Safety Standards, OC SAN Engineering Design Guidelines and other OC SAN Design Standards up to transmittal by OC SAN of comments on Design Submittal 2, shall be incorporated into the Design by CONSULTANT with no increase in CONSULTANT’s Not-to- Exceed upper limit on fees. J. OC SAN may update OC SAN’s Master Specifications and/or add new OC SAN Master Specifications up to transmittal by OC SAN of comments on Design Submittal 2. The CONSULTANT shall utilize the new and/or modified Master Specifications for the DS3 submittal. K. The CONSULTANT shall not begin editing the project specifications until the project team meets with OC SAN’s Design Standards Custodian to discuss and receive comments regarding the CONSULTANT’s proposed list of project specifications. This meeting will be used to determine which specifications are to use OC SAN’s master specifications, and where other sources will be utilized. 7.0.2 PROJECT PHASES AND TASKS A. Project tasks and deliverables shall include the requirements described in this Scope of Work. CONSULTANT shall also refer to Appendix A of OC SAN Engineering Design Guidelines for the level of detail requirements for individual deliverables in each Phase of the project not covered in the Scope of Work. 7.0.3 CONSTRUCTION SEQUENCING AND CONSTRAINTS A. CONSULTANT shall develop with OC SAN staff and include in the Bid Documents detailed requirements for construction sequencing and constraints. These shall ensure safe and reliable operation and maintenance of OC SAN facilities. The facilities must be kept on-line and fully operational with minimal interruptions throughout construction. 7.0.4 WORKING HOURS A. Meetings with OC SAN staff shall be scheduled from Monday through Thursday between the hours of 8:00 AM and 4:00 PM. Any CONSULTANT staff working on-site shall conform to OC March 2026 7-63 – Design SOW Page 37 of 41 SAN work schedules. CONSULTANT shall refer to the Engineering Design Guidelines, Chapter 01, Section 01.3.5 “CONSULTANT Inspection of Treatment Facilities” for further requirements. 7.0.5 STANDARD DRAWINGS AND TYPICAL DETAILS A. All the details used in the project (OC SAN’s Standard Drawings and CONSULTANT- developed typical details) shall be shown on the Plans. 7.0.6 SOFTWARE A. The CONSULTANT is expected to develop and provide the deliverables using the standard software currently approved for use by OC SAN. The standard OC SAN software includes, but is not limited to, the following: 1. Windows Professional 2. Esri software (fGDB, pGDB or shapefile formats) 3. Microsoft Internet Explorer 4. Autodesk software (AutoCAD, AutoCAD Map3D or compatible dwg file format) 5. Microsoft Office, including MS Teams 6. Maximo 7. Bluebeam Revu Extreme & Studio 8. Primavera P6 for scheduling 9. Database software as defined in the project SOW B. Refer to Chapters 10 and 11 and Appendix A of OC SAN Engineering Design Guidelines for requirements on preparation of Criticality Tables and ETAP, Real IO List, and EID databases. Refer to OC SAN CAD Manual and to Chapter 11 and Appendix A of OC SAN Engineering Design Guidelines for requirements regarding P&ID drawings. 7.0.7 SUBMITTAL REVIEW USING BLUEBEAM A. OC SAN has standardized on the use of Bluebeam Revu for reviewing and providing comments to PDF files. PDF files will be hosted in a Bluebeam cloud-based studio session for review. See Exhibit 15 - Bluebeam Designer User Training for a detailed explanation on how Bluebeam will be used to provide, validate, and close submittal review comments. B. Prior to submitting electronic PDF files, format them as indicated in Exhibit 14 - Bluebeam Designer Training for Submission and “OC SAN CAD Standards Manual” prior to submission. C. A one-hour training session on the use of Bluebeam and custom status menu will be provided by OC SAN. All CONSULTANT team members responsible for quality control and reconciliation of submittal comments shall attend. 7.0.8 WORD TRACK CHANGES A. Specifications documents and other MS-Word based deliverables will be hosted in OC SAN Teams environment for review. The guidelines for reviewing and commenting on MS-Word files, including Specifications reviews, can be found in Exhibit 16 - Spec Review using Microsoft Word and Teams. 7.0.9 GIS SUBMITTALS A. CONSULTANT shall provide the following GIS deliverables propagated from approved design submittals after the design submittal is accepted. These GIS submittals will not be reviewed or presented by CONSULTANT. The purpose is to provide project specific GIS layers that could be used to visualize interproject dependencies and conflicts. 1. Electronic Submittal March 2026 7-63 – Design SOW Page 38 of 41 a. Kmz files for use with Google Earth 2. Final PDR a. Single project boundary (Polygon) (1) Boundary to encompass all new facilities and existing to be modified including: • Buildings\Structures • Tunnels • Utilities • Pavement • Street boundary (ROW to ROW) of possible alignment • Easements and ROW b. Structures (Polygon) • New structure outline • Additions to existing structures • Structure label 3. DS1 a. Project boundary - updated from PDR b. Structures - updated from PDR c. Utilities (Polyline) (1) Utility alignment (2) Known attributes (i.e. pipe diameter, material, system) d. Manholes (Point) (1) MH Invert Elevation (2) Access information (cover diameter) e. Excavation of pits (Polygon) (1) Pits that will stay open for extended duration (2) CIPP (3) Tunnel - jacking and receiving (4) All pits should be labeled 4. DS2, DS3, and FDS a. Project boundary - updated from previous DS b. Structures - updated from previous DS c. Utilities - updated from previous DS d. Manholes - updated from previous DS e. Excavation of pits - updated from previous DS f. Critical (as defined by Dig Alert) utility crossings (Point) (1) Crossing of Dig Alert critical utilities (2) Critical utility label • Natural gas March 2026 7-63 – Design SOW Page 39 of 41 • Fuel pipeline • 12 kV Electrical (3) Metadata (source, accuracy and date of data) g. Asphalt (Polygon) (1) Asphalt to be replaced 8. PROJECT-SPECIFIC DEVIATIONS FROM OC SAN DESIGN GUIDELINES The following Scope sections change the Engineering Design Guidelines requirements for this project and apply to ALL its Project Elements: ENGINEERING DESIGN GUIDELINES CHAPTER 01, “DESIGN GUIDELINES – GENERAL REQUIREMENTS” 8.0.1 ENGINEERING DESIGN GUIDELINES CHAPTER 06, “MECHANICAL DESIGN” A. Section 06.7 “Vibration Analysis for Rotating Electrical Equipment” 1. Replace the entire section with the following: CONSULTANT shall perform a RUN evaluation for all pumping systems according to ANSI/HI 9.6.8-2014 or latest (Rotodynamic Pumps—Guideline for Dynamics of Pumping Machinery), to assess various vibration related phenomena. RUN is the general term used to denote the quantity obtained from multiplying the Risk (R) value and Uncertainty (U) value determined during the appropriate evaluation. This evaluation will help determine the relevant analysis level required to appropriately evaluate pumping machinery construction attributes and relevant site characteristics. CONSULTANT shall obtain (from the manufacturers of the rotating equipment) or calculate (based on anticipated turning speeds, operational requirements, etc.) the relevant equipment and system natural and/or excitation frequencies. These frequencies will include any effect from the various torsional, lateral, and structural behaviors of the equipment or system. All other rotating equipment such as fans, blowers, compressors, and pumps/equipment not covered by other standards or specifications, etc. shall undergo a similar evaluation to determine relevant risk and analysis requirements to ensure project success and reliability targets are met. For these other types of rotating equipment not covered by other standards or specifications, the CONSULTANT shall propose a plan for OC SAN to approve prior to analysis being performed accordingly. For the purpose of estimating level of effort, the Risk Value, “R”, for critical equipment that is required for continuous operation of a process system or where standard equipment is modified slightly for this application, a R-Value of 4 should be assumed. For systems dedicated to a redundant process train or where standard equipment is used, a R-Value of 2 should be assumed. The results from the above RUN evaluation shall be used by the CONSULTANT in their subsequent design, to help provide a robust solution for the project needs. Iterations of design and equipment substitutions shall trigger additional RUN evaluations and analysis, as needed. Final equipment acceptability and commissioning shall be per ANSI/HI 9.6.4-2009 or latest (Rotodynamic Pumps—for Vibration Measurements and Allowable Values), applicable Part of ISO 10816 latest (Mechanical Vibration), ANSI/AMCA 204-05:2012 or latest (Balance Quality and Vibration Levels for Fans), ISO 1940-1:2003 or latest (Mechanical Vibration—Balance Quality Requirements for Rotors in a Constant (Rigid) State), and ISO 21940-12:2016 or latest (Mechanical Vibration— March 2026 7-63 – Design SOW Page 40 of 41 Rotor Balancing—Procedures and Tolerances for Rotors with Flexible Behavior) as applicable. In addition, all loads, forces and moments imparted to equipment or piping, including resonance, shall be fully mitigated and all usage cases analyzed and documented per ASME 31.3-2018 or latest (Process Piping) at a minimum, and properly designed within applicable allowable stresses, etc. If there are conflicts in the standards specified, the more stringent value or condition to prevail. 9. STAFF ASSISTANCE OC SAN staff member or designee assigned to work with CONSULTANT on the design of this project is Omeed Pour at (714) 593-7226, e-mail to: OPour@ocsan.gov. 10. EXHIBITS Exhibit 1 - Preliminary Design Report Requirements Exhibit 2 - Design Requirements Exhibit 3 - Project Management Requirements Exhibit 4 - Risk Management Requirements Exhibit 5 - Workshop and Meeting Requirements Exhibit 6 - Quality Control Requirements Exhibit 7 - Design Submittal Requirements Matrix Exhibit 8 - Project Schedule Calculation Exhibit 9 - Deliverables Quantities Exhibit 10 - Sample Construction Cost Estimate Formats a. Exhibit 10a – Sample Construction Cost Estimate Format Sample 1 b. Exhibit 10b – Sample Construction Cost Estimate Format Sample 2-6 c. Exhibit 10c – Sample Construction Cost Estimate Format Sample 7 Exhibit 11 - Project Safety Check List Exhibit 12 - Full Project Safety Review Plan Exhibit 13 - MMRP Log Template (Not Used) Exhibit 14 - Bluebeam Designer Training for Submission Exhibit 15 - Bluebeam Designer User Training Exhibit 16 - Spec Review using Microsoft Word and Teams Exhibit 17 - OC SAN Engineering Design Guidelines and Standards – Available online at https://www.ocsan.gov/document-center/ Exhibit 18 - Project Control Management System a. Attachment A – Master Construction Submittal Items List Exhibit 19 - Project Reference Material b. 7-1-D MacArthur Pump Station and Force Main – 1960 (13 Sheets) c. 7-11-3 Abandonment of Castlerock and Dow Avenue Pump Stations & Modifications to MacArthur Pump Station – 1989 (13 Sheets) d. 7-68 MacArthur Force Main Improvements – 2025 (50 Sheets) March 2026 7-63 – Design SOW Page 41 of 41 e. 57B-NP-110 MacArthur Pump Station P&ID – 2022 (1 Sheet) f. FE05-37 OCSD Pump Stations Area Classification Drawing Update – 2009 (4 Sheets) g. J-126L Safety Improvements at Bitter Point, MacArthur, Seal Beach, Westside, and Yorba Linda Pump Stations – 2019 (18 Sheets) h. MacArthur Pump Station Corrosion Assessment (15 Pages) i. MacArthur Pump Station Visual Evaluation (19 Pages) Exhibit 20 - CONSULTANT Outreach Presentation Exhibit 21 – Commissioning Procedure Training Exhibit 22 - ORT Procedure Examples Exhibit 23 - Sample Pre-FAT Procedure Exhibit 24 - Sample FAT Procedure Exhibit 25 - Sample RAT Procedure Exhibit 26 - Sample FAT Narrative AS:op EXHIBITS Exhibits to Attachment A Scope of Work are considered reference material and were previously provided as part of the Request for Proposals. OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4870 Agenda Date:4/22/2026 Agenda Item No:6. FROM:Robert Thompson, General Manager Originator: Riaz Moinuddin, Director of Operations & Maintenance SUBJECT: CENTRAL GENERATION ENGINE NO. 1 INSPECTION AND REPAIRS, SPECIFICATION NO. BSS -2026-728BD GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Sole Source Service Contract with Cooper Machinery Services LLC for inspection and field service repairs to Central Generation (Cen Gen) Engine No. 1, Specification No. BSS -2026-728BD, for a total amount not to exceed $142,923, plus applicable sales tax and freight; and B. Approve additional allowance funding not to exceed $120,000 for associated repairs that may be required due to the high potential for additional damage identified during disassembly and inspection. BACKGROUND The Orange County Sanitation District (OC San)has eight clean-burning internal combustion engines that are used to generate electricity for both treatment plants.These engines play a vital role in OC San’s emissions reduction and South Coast Air Quality Management District permit compliance by converting biogas into electricity and process heat.This engine was rebuilt several years ago by a non-Original Equipment Manufacturer (OEM)vendor with non-OEM parts.It experienced a catastrophic failure.It was later rebuilt by Cooper Machinery Services LLC,but the cylinder liners were not replaced at the time. On January 27,2026,Cen Gen at Plant No.1,Engine No.1,had a premature failure in cylinder 3.A preliminary investigation determined that the piston had worn into the cylinder liner,causing excessive heat and pressure in the crankcase. RELEVANT STANDARDS ·24/7/365 treatment plant reliability ·Maintain a proactive asset management program ·Operate and maintain facilities to minimize impacts on surrounding communities,including odor, noise, and lighting Orange County Sanitation District Printed on 4/14/2026Page 1 of 3 powered by Legistar™ File #:2026-4870 Agenda Date:4/22/2026 Agenda Item No:6. PROBLEM Due to a leak and significant damage to cylinder 3,Engine No.1 is currently inoperable.Field repairs and further inspection are required to assess the extent of the damage and determine if any additional repairs are needed. PROPOSED SOLUTION Approve a Sole Source Service Contract to the OEM to disassemble, inspect, and repair the engine. TIMING CONCERNS Delays in completing repairs would increase the risk of plant process interruptions. RAMIFICATIONS OF NOT TAKING ACTION Failing to act would leave plant operations without essential backup equipment for heating digesters and electricity generation,increasing the risk to process reliability and the potential for sewage spills. Extended downtime could also disrupt power production and compromise permit compliance. PRIOR COMMITTEE/BOARD ACTIONS August 2017 -Received and filed Orange County Sanitation District purchases made under the General Manager’s authority for the period of April 1,2017 to June 30,2017;and approved the following additions to the pre-approved Original Equipment Manufacturer (OEM)Sole Source List:… Cooper Bessemer - CenGen engine components. ADDITIONAL INFORMATION Cooper Machinery Services LLC (formerly Cooper-Bessemer)is the OEM for all parts and services related to Cooper-Bessemer engines.A $120,000 allowance is intended to address potential additional engine damage, tariffs, or other unforeseeable costs. CEQA N/A FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget Update FY 2025-26,Page 33,Repair &Maintenance)and the budget is sufficient for the recommended action. Date of Approval Contract Amount Additional Allowance 04/22/2026 $142,923 $120,000 Orange County Sanitation District Printed on 4/14/2026Page 2 of 3 powered by Legistar™ File #:2026-4870 Agenda Date:4/22/2026 Agenda Item No:6. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Sole Source Service Contract ·Presentation Orange County Sanitation District Printed on 4/14/2026Page 3 of 3 powered by Legistar™ Orange County Sanitation District 1 of 12 Specification No.BSS-2026-728BD SOLE SOURCE SERVICE CONTRACT Central Generation (Cen Gen) Engine No. 1 Inspection and Repairs Specification No. BSS-2026-728BD THIS SOLE SOURCE CONTRACT is made and entered into as of the date fully executed below, by and between Orange County Sanitation District, with a principal place of business at 18480 Bandilier Circle, Fountain Valley, CA 92708 (hereinafter referred to as "OC San") and Cooper Machinery Services LLC with a principal place of business at 16250 Port Northwest Drive, Houston, Texas 77041 (hereinafter referred to as "Contractor") collectively referred to as the “Parties”. W I T N E S S E T H WHEREAS, OC San desires to retain the services of Contractor for Central Generation (Cen Gen) Engine No. 1 Inspection and Repairs, “Services” as described in Exhibit “B”; and WHEREAS, OC San has chosen Contractor to conduct Services in accordance with OC San’s current Purchasing Ordinance; and WHEREAS, on April 22, 2026, the Board of Directors of OC San, by minute order, authorized execution of this Contract between OC San and Contractor; and WHEREAS, Contractor is qualified by virtue of experience, training, and expertise to accomplish such Services. NOW, THEREFORE, in consideration of the mutual promises and mutual benefits exchanged between the Parties, the Parties mutually agree as follows: 1. Introduction. 1.1 This Contract and all exhibits hereto (called the "Contract") is made by OC San and the Contractor. The terms and conditions herein exclusively govern the purchase of Services as described in Exhibit “B”. 1.2 Exhibits to this Contract are incorporated by reference and made a part of this Contract as though fully set forth at length herein. Exhibit “A” Not Applicable Exhibit “B” Proposal Exhibit “C” Determined Insurance Requirements Form Exhibit “D” Contractor Safety Standards Exhibit “E” Human Resources Policies Exhibit “F” General Conditions 1.3 In the event of any conflict or inconsistency between the provisions of this Contract and any of the provisions of the exhibits hereto, the provisions of this Sole Source Service Contract shall in all respects govern and control. 1.4 The provisions of this Contract may be amended or waived only by a writing executed by authorized representatives of both Parties hereto. 1.5 The various headings in this Contract are inserted for convenience only and shall not affect the meaning or interpretation of this Contract or any paragraph or provision hereof. 1.6 The term “days”, when used in the Contract, shall mean calendar days, unless otherwise noted as business days. Orange County Sanitation District 2 of 12 Specification No.BSS-2026-728BD 1.7 OC San holidays (non-working days) are as follows: New Year’s Day, Lincoln’s Birthday, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Day after Thanksgiving, Christmas Eve, and Christmas Day. 1.8 The term “hours”, when used in this Contract, shall be as defined in Exhibit “A”. 1.9 Contractor shall provide OC San with all required premiums and/or overtime work, as specified in this Contract, at no charge beyond the price provided under “Compensation” below. 1.10 Except as expressly provided otherwise, OC San accepts no liability for any expenses, losses, or action incurred or undertaken by Contractor as a result of work performed in anticipation of purchases of said services by OC San. 2. Compensation. Compensation to be paid by OC San to Contractor for the Services provided under this Contract shall be a total amount not to exceed One Hundred Forty-Two Thousand Nine Hundred Twenty-Two 55/100 Dollars ($142,922.55) 3. California Department of Industrial Relations (DIR) Registration and Record of Wages. 3.1 Pursuant to Labor Code sections 1720 et seq., and as specified in Title 8, California Code of Regulations section 16000, prevailing wages are required to be paid for all work under this Contract. It is Contractor’s responsibility to interpret and implement any prevailing wage requirements and Contractor agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws. 3.2 Contractor and its subcontractors shall comply with the registration requirements of Labor Code section 1725.5. Pursuant to Labor Code section 1771.4(a)(1), the work is subject to compliance monitoring and enforcement by the California Department of Industrial Relations (DIR). 3.3 Pursuant to Labor Code section 1773.2, a copy of the prevailing rate of per diem wages is available upon request at OC San’s principal office. The prevailing rate of per diem wages may also be found at the DIR website for prevailing wage determinations at http://www.dir.ca.gov/DLSR/PWD. 3.4 Contractor and its subcontractors shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations section 16461(e). Pursuant to Labor Code sections 1773.2 and 1771.4(a)(2), Contractor shall post a copy of the prevailing rate of per diem wages at the job site. 3.5 Contractor and its subcontractors shall maintain accurate payroll records and shall comply with all the provisions of Labor Code section 1776. Contractor and its subcontractors shall submit payroll records to the Labor Commissioner pursuant to Labor Code section 1771.4(a)(3). Pursuant to Labor Code section 1776, the Contractor and its subcontractors shall furnish a copy of all certified payroll records to OC San and/or the general public upon request, provided the public request is made through OC San, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement of the Department of Industrial Relations. Pursuant to Labor Code section 1776(h), penalties for non-compliance with a request for payroll records may be deducted from progress payments. ▪ As a condition to receiving payments, Contractor agrees to present to OC San, along with any request for payment, all applicable and necessary certified payrolls and other required documents for the period covering such payment request. Pursuant to Title 8, California Code of Regulations section 16463, OC San shall withhold any portion of a payment, up Orange County Sanitation District 3 of 12 Specification No.BSS-2026-728BD to and including the entire payment amount, until certified payroll forms and any other required documents are properly submitted. In the event certified payroll forms do not comply with the requirements of Labor Code section 1776, OC San may continue to withhold sufficient funds to cover estimated wages and penalties under the Contract. 3.6 The Contractor and its subcontractors shall comply with Labor Code section 1774 and section 1775. Pursuant to Labor Code section 1775, the Contractor and any of its subcontractors shall forfeit to OC San a penalty of not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any work. ▪ In addition to the penalty and pursuant to Labor Code section 1775, the difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the Contractor or its subcontractor. 3.7 Contractor and its subcontractors shall comply with Labor Code sections 1810 through 1815. Contractor and its subcontractors shall restrict working hours to eight (8) hours per day and forty (40) hours per week, except that work performed in excess of those limits shall be permitted upon compensation for all excess hours worked at not less than one and one-half (1.5) times the basic rate of pay, as provided in Labor Code section 1815. The Contractor shall forfeit, as a penalty to OC San, twenty-five dollars ($25) per worker per calendar day during which such worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of Labor Code sections 1810 through 1815. 3.8 Contractor and its subcontractors shall comply with Labor Code sections 1777.5, 1777.6, and 1777.7 concerning the employment of apprentices by Contractor or any subcontractor. 3.9 Contractor shall include, at a minimum, a copy of the following provisions in any contract it enters into with any subcontractor: Labor Code sections 1771, 1771.1, 1775, 1776, 1777.5, 1810, 1813, 1815, 1860, and 1861. 3.10 Pursuant to Labor Code sections 1860 and 3700, the Contractor and its subcontractors will be required to secure the payment of compensation to employees. Pursuant to Labor Code section 1861, Contractor, by accepting this contract, certifies that: “I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” Contractor shall ensure that all its contracts with its subcontractors provide the provision above. 4. Payments and Invoicing. 4.1 OC San shall pay, net 30 days, upon receipt, by OC San’s Engineer (“Engineer”) or designee, of itemized invoices submitted for Milestones completed in accordance with Exhibit B. 4.2 OC San shall approve or reject invoices within 14 days of receipt. Any invoice not rejected in writing within 14 days of receipt shall be deemed approved by OC San. OC San, at its sole discretion, shall be the determining party as to whether the Services have been satisfactorily completed. In the event OC San disputes an invoice or has a reasonable basis for determining Services have not been satisfactorily completed, OC San agrees to pay the undisputed portion of any invoice in a timely manner while both parties agree to discuss in Orange County Sanitation District 4 of 12 Specification No.BSS-2026-728BD good faith to resolve the disputed portions of an invoice. If OC San fails to pay an undisputed invoice after receiving 30 days written notice of non-payment, Contractor shall have the right to suspend performance and Contract Term shall be extended for a time equal to the suspension for non-payment. Should suspension for non-payment last 30 days, Contractor shall have the right to terminate and OC San agrees to pay termination fees in accordance with Section 12.1. 4.3 Invoices shall be emailed by Contractor to OC San Accounts Payable at APStaff@OCSD.com and “INVOICE” with the Purchase Order Number and Specification No. BSS-2026-728BD shall be referenced in the subject line. 5. Audit Rights. Contractor agrees that, during the term of this Contract and for a period of three years after its termination, OC San shall have access to and the right to examine any directly pertinent books, documents, and records of Contractor relating to the invoices submitted by Contractor pursuant to this Contract. OC San agrees all audits are subject to confidentiality and non-disclosure provisions and are limited to the purpose of OC San verification of payment and invoicing records, except to the extent required by a government agency. 6. Scope of Work. Subject to the terms of this Contract, Contractor shall perform the Services identified in Exhibit “B”. Contractor shall perform said Services in accordance with generally accepted industry and professional standards. 7. Modifications to Scope of Work. Requests for modifications to the Scope of Work or due to delays solely attributable to OC San hereunder can be made by either party at any time. All modifications must be made in writing, approved and signed by both Parties before any Work on the modification shall begin. In the event of a modification, time of performance and payment for work shall be altered accordingly. 8. Contract Term. The Services provided under this Contract shall be completed within forty (40) calendar days from the effective date of the Notice to Proceed. 9. Renewals. Not Used 10. Extensions. The term of this Contract may be extended only by written instrument signed by both Parties. 11. Performance. Time is of the essence in the performance of the provisions hereof. 12. Termination. 12.1 OC San reserves the right to terminate this Contract for its convenience, with or without cause, in whole or in part, at any time, by written notice from OC San of intent to terminate. OC San also reserves the right to terminate this Contract for default in accordance with section 12.2 and 12.3. Upon receipt of a termination notice for convenience or terminate notice under 12.3, Contractor shall immediately discontinue all work under this Contract (unless the notice directs otherwise). In all cases of termination whether for convenience or default, OC San shall thereafter, within thirty 30 days, pay Contractor for work performed (cost and fee) to the date of termination, including any reasonable costs and expenses incurred by Contractor as a direct result of such termination for any goods or services in progress prior to the effective date of termination. Contractor expressly waives any claim to receive anticipated profits to be earned during the uncompleted portion of this Contract. Such notice of termination shall terminate this Contract and Contractor shall release OC San from any further fee, cost or claim relating to the terminated portion of the Contract, hereunder by Contractor. Orange County Sanitation District 5 of 12 Specification No.BSS-2026-728BD 12.2 OC San reserves the right to terminate this Contract upon determination that Contractor has materially breached any of the terms of this Contract and failed to commence to cure within 10 days with continual diligent efforts following receipt of written notice of such breach. In the event of termination under this section, Contractor total liability shall not exceed the actual and reasonable documented costs and expenses to complete the terminated Scope of Work. 12.3 OC San may also immediately cancel for default of this Contract in whole or in part by written notice to Contractor: ▪ if Contractor becomes insolvent or files a petition under the Bankruptcy Act; or 12.4 All OC San property in the possession or control of Contractor shall be returned by Contractor to OC San upon demand, or at the termination of this Contract, whichever occurs first. 13. Insurance. Contractor and all subcontractors shall purchase and maintain, throughout the life of this Contract and any periods of warranty or extensions, insurance in amounts equal to the requirements set forth in the signed Determined Insurance Requirements Form (attached hereto and incorporated herein as Exhibit “C “). Contractor shall not commence work under this Contract until all required insurance is obtained in a form acceptable to OC San, nor shall Contractor allow any subcontractor to commence service pursuant to a subcontract until all insurance required of the subcontractor has been obtained. Failure to maintain required insurance coverage shall result in termination of this Contract. Any requirements for additional insured, waiver of rights of subrogation or recognition of Contractor’s insurance as primary shall apply only to the extent of the legally binding indemnities agreed to by Contractor in the Contract. 14. Bonds. Not Applicable 15. Indemnification and Hold Harmless Provision. Contractor shall assume responsibility for direct damages to property and/or injuries to persons, including accidental death, to the extent such damages arise out of or are caused by the negligence of Contractor under this Contract, or by the negligence of its subcontractor(s) or by anyone directly or indirectly employed by Contractor, and whether such damage or injury shall accrue or be discovered before or after the termination of the Contract. Contractor shall indemnify, protect, defend and hold harmless OC San, its elected and appointed officials, officers, agents and employees, from and against any and all claims, liabilities, damages or expenses of any nature, including attorneys' fees: (a) for injury to or death of any person or damage to property , to the extent arising out of or in connection with Contractor's negligent performance under the Contract, and/or (b) to the extent on account of use of any copyrighted or uncopyrighted material, composition, or process, or any patented or unpatented invention, article or appliance, furnished or used directly by Contractor or its subcontractor(s) under the Contract. This indemnification provision shall apply to any acts or omissions, willful misconduct, or negligent misconduct, whether active or passive, on the part of Contractor of or anyone employed by or working under Contractor. Notwithstanding the foregoing, Contractor has no responsibility to and will not indemnify OC San, or its elected and appointed officials, officers, agents and employees, for claims, liabilities, expenses, or damages of any nature to the extent arising from, caused by or in connection with OC San’s negligence (sole, joint, or concurrent), gross negligence, willful misconduct or any other fault on the part of OC San. 16. Contractor Safety Standards. OC San requires Contractor and its subcontractor(s) to follow and ensure their employees follow all Federal, State, and local regulations as well as the Contractor Safety Standards while working at OC San locations. If during the Contract it is discovered that the Contractor Safety Standards do not comply with Federal, State, or local regulations, then the Contractor is required to follow the most stringent regulatory requirement Orange County Sanitation District 6 of 12 Specification No.BSS-2026-728BD at no additional cost to OC San. Contractor and all of its employees and subcontractors, shall adhere to all applicable Contractor Safety Standards attached hereto in Exhibit “D” and the Human Resources Policies (Exhibit “E”). 17. California Voluntary Protection Program Annual Reporting Requirement. If Contractor will potentially work 1,000 combined hours in a quarter, for the term of the Agreement, Contractor shall provide an annual report detailing its safety and health information, including, but not limited to, its total number of employees, work hours, number of injuries and illnesses, and number of injury and illness cases involving days away from work, restricted work activity and/or job transfer. Contractor shall furnish this report to OC San no later than January 20th each calendar year. Failure to provide this data by the required due date may result in suspension of Contractor’s services with OC San. Any delay arising out of or resulting from such suspension shall be Contractor’s sole responsibility and considered Contractor caused delay, which shall not be compensable by OC San. 18. Warranties. In addition to the warranties stated in Exhibit "A", the following shall apply: 18.1 Where applicable, Contractor supplier’s standard warranty shall apply. To the extent possible, Contractor shall transfer its supplier’s warranties to OC San for the work as complete. Contractor's Warranty (Guarantee): Contractor warrants that any goods, parts, repairs, or upgrades supplied by Contractor under this Contract shall (i) be free from any materials and workmanship for the specified warranty period, (ii) conform to the specifications mutually agreed in Exhibit “A” (herein incorporated by reference), and (iii) all Services will be performed in a competent and diligent manner in accordance with generally accepted standards for such services. If within a one-year period of completion of all work as specified in Exhibit “B”, OC San informs Contractor in writing that any portion of the Services provided fails to meet the standards required under this section 17 of the Contract, Contractor shall, within the time agreed to by OC San and Contractor, repair, replace, or re-perform the noted non-conforming deficiency(ies) in goods or Services at Contractor's sole option and expense. If the good or Service cannot be made to conform to the warranty in this section by repair, replace, or re- performance, Contractor’s responsibility shall be to refund the portion of the purchase price allocated to the non-conforming goods or Services. The remedies set forth in this section constitute the sole and exclusive remedies for all claims arising out of or related to any defect or non-conformity in the products, parts, goods, or services regardless when the defect or non-conformity arises. Contractor shall have no responsibility to repair or replace defective equipment or component parts resulting from the use of repair or replacement parts not of Contractor’s manufacture or approved by Contractor or from OC San’s failure to store, install, maintain, and operate the equipment according to Contractor’s written instructions and drawings and standard industry practice. Deterioration and wear occasioned by chemical and abrasive action or excessive heat shall not constitute defects. Transportation of products to and from Contractor’s service facility shall be borne to OC San when a repair is not covered by warranty. Warranty work provided under this Contract does not assure uninterrupted operation of the products. Equipment and accessories furnished by third parties which are not incorporated in the equipment manufactured by Contractor are warranted only to the extent of the original manufacturer’s warranty to Contractor. THE WARRANTIES SET FORTH IN THIS SECTION 17 ARE EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES, CONDITIONS, AND GUARANTEES, WHETHER WRITTEN OR ORAL. NO IMPLED WARRANTY OR CONDITION, INCLUDING MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE SHALL APPLY. 19. Liquidated Damages. Not Applicable Orange County Sanitation District 7 of 12 Specification No.BSS-2026-728BD 20. Damages. Contractor’s total responsibility for any claims, including but not limited to indemnity claims under Section 15, damages, losses or liabilities arising out of or related to its performance of this Contract or the products and Services covered hereunder shall not exceed two times the Contract price. EXCLUDING CLAIMS RESULTING FROM GROSS NEGLIGENCE OR WILLFUL MISCONDUCT, IN NO EVENT SHALL CONTRACTOR OR OC San BE LIABLE FOR PUNITIVE, INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES OF ANY KIND AS DEFINED BY THE LAW GOVERNING THIS CONTRACT RESULTING FROM OR ARISING OUT OF THIS CONTRACT, INCLUDING WITHOUT LIMITATION, LOSS OF PROFIT, REVENUE, PRODUCTION OR USE HOWSOEVER SAME MAY BE CAUSED. 21. Force Majeure. Neither party shall be liable for delays caused by accident, flood, acts of God, fire, labor trouble, war, acts of government or any other cause beyond its control, but said party shall use reasonable efforts to minimize the extent of the delay. Work affected by a Force Majeure condition may be rescheduled by mutual consent or may be eliminated from the Contract. 22. Freight (F.O.B. Destination). Contractor assumes full responsibility for all transportation, transportation scheduling, packing, handling, insurance, and other services associated with delivery of all products deemed necessary under this Contract. 23. Familiarity with Work. By executing this Contract, Contractor warrants that: 1) it has investigated the work to be performed; 2) it has investigated the site of the work and is aware of all conditions there; and 3) it understands the facilities, difficulties and restrictions of the work under this Contract. Should Contractor discover any latent or unknown conditions materially differing from those inherent in the work or as represented by OC San, it shall immediately inform OC San of this and shall not proceed, except at Contractor’s risk, until written instructions are received from OC San. 24. Regulatory Requirements. Contractor shall perform all work under this Contract in strict conformance with applicable Federal, State, and local regulatory requirements including, but not limited to, 40 CFR 122, 123, 124, 257, 258, 260, 261, and 503, Title 22, 23, and California Water Codes Division 2. 25. Environmental Compliance. Contractor shall, at its own cost and expense, comply with all Federal, State, and local environmental laws, regulations, and policies which apply to the Contractor, its subcontractors, and the Services, including, but not limited to, all applicable Federal, State, and local air pollution control laws and regulations. 26. Licenses, Permits, Ordinances and Regulations. Contractor represents and warrants to OC San that it has obtained all licenses, permits, qualifications, and approvals required to be in Contractor’s name of whatever nature that are legally required to engage in this work. Any and all fees required by Federal, State, County, City and/or municipal laws, codes and/or tariffs that pertain to the work performed under the terms of this Contract will be paid by Contractor. 27. Applicable Laws and Regulations. Contractor shall comply with all applicable Federal, State, and local laws, rules, and regulations. Contractor also agrees to indemnify and hold harmless from any and all damages and liabilities assessed against OC San as a result of Contractor's noncompliance therewith. Any permission required by law to be included herein shall be deemed included as a part of this Contract whether or not specifically referenced. Orange County Sanitation District 8 of 12 Specification No.BSS-2026-728BD 28. Contractor’s Employees Compensation. 28.1 General Prevailing Rate – OC San has been advised by the State of California Director of Industrial Relations of its determination of the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed to execute this Contract, and copies of same are on file in the Engineering Department. The Contractor agrees that not less than said prevailing rates shall be paid to workers employed on this Contract as required by Labor Code Section 1774 of the State of California. Per California Labor Code 1773.2, OC San will have on file copies of the prevailing rate of per diem wages at its principal office and at each project site, which shall be made available to any interested party upon request. 28.2 Forfeiture For Violation – Contractor shall, as a penalty to OC San, forfeit $50.00 for each calendar day or portion thereof for each worker paid (either by the Contractor or any subcontractor under it) less than the prevailing rate of per diem wages as set by the Director of Industrial Relations, in accordance with Sections 1770-1780 of the California Labor Code for the work provided for in this Contract, all in accordance with Section 1775 of the Labor Code of the State of California. 28.3 Apprentices – Sections 1777.5, 1777.6, 1777.7 of the Labor Code of the State of California, regarding the employment of apprentices are applicable to this Contract and the Contractor shall comply therewith if the prime contract involves $30,000.00 or more or 20 working days or more; or if contracts of specialty contractors not bidding for work through the general or prime Contractor are $2,000.00 or more or five working days or more. 28.4 Workday – In the performance of this Contract, not more than eight hours shall constitute a day’s work, and the Contractor shall not require more than eight hours of labor in a day from any person employed by it hereunder. Contractor shall conform to Article 3, Chapter 1, Part 7 (Section 1810 et seq.) of the Labor Code of the State of California and shall forfeit to OC San as a penalty, the sum of $25.00 for each worker employed in the execution of this Contract by Contractor or any subcontractor for each calendar day during which any worker is required or permitted to labor more than eight hours in any one calendar day and 40 hours in any one week in violation of said Article. Contractor shall keep an accurate record showing the name and actual hours worked each calendar day and each calendar week by each worker employed by Contractor in connection with the project. Record of Wages; Inspection – Contractor agrees to maintain accurate payroll records showing the name, address, social security number, work classification, straight-time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed by it in connection with the project and agrees to require that each of its subcontractors do the same. All payroll records shall be certified as accurate by the applicable Contractor or subcontractor or its agent having authority over such matters. Subject to the audit provisions herein, Contractor further agrees that its payroll records and those of its subcontractors shall be available to the employee or employee’s representative, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards and shall comply with all of the provisions of Labor Code Section 1776, in general. Penalties for non-compliance with the requirements of Section 1776 charged to OC San may be deducted from project payments per the requirements of Section 1776. 29. South Coast Air Quality Management District’s (SCAQMD) Requirements. It is Contractor’s responsibility that all equipment furnished and installed be in accordance with the latest rules and regulations of the South Coast Air Quality Management District (SCAQMD). All Contract work practices, which may have associated emissions such as Orange County Sanitation District 9 of 12 Specification No.BSS-2026-728BD sandblasting, open field spray painting or demolition of asbestos containing components or structures, shall comply with the appropriate rules and regulations of the SCAQMD. 30. California Air Resources Board Mobile Source Regulations. Contractor and its applicable consultants, subconsultants, and subcontractors shall comply with the following California Air Resources Board Mobile Source Regulations: • Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6 • Truck & Bus Regulation (T&B): 13 CCR 2025 • Clean Truck Check (CTC): 13 CCR 2195-2199.1 • Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2 31. Governing Law. This Contract shall be governed by and interpreted under the laws of the State of California and the Parties submit to jurisdiction in the County of Orange, in the event any action is brought in connection with this Contract or the performance thereof. 32. Breach. The waiver of either party of any breach or violation of, or default under, any provision of this Contract, shall not be deemed a continuing waiver by such party of any other provision or of any subsequent breach or violation of this Contract or default thereunder. Any breach by Contractor to which OC San does not object shall not operate as a waiver of OC San’s rights to seek remedies available to it for any subsequent breach. 33. Remedies. With respect to that subject matter and/or circumstances or events for which specific remedies are set forth in this Contract, including, without limitation, those remedies with respect to the Services performed by Contractor hereunder, then such remedies shall be the exclusive remedies of the parties. If no such specific remedy is provided, then the parties shall have available to them any remedy available under applicable law or in equity. 34. Dispute Resolution. 34.1 In the event of a dispute as to the construction or interpretation of this Contract, or any rights or obligations hereunder, the Parties shall first attempt, in good faith, to resolve the dispute by mediation. The Parties shall mutually select a mediator to facilitate the resolution of the dispute. If the Parties are unable to agree on a mediator, the mediation shall be conducted in accordance with the Commercial Mediation Rules of the American Arbitration Agreement, through the alternate dispute resolution procedures of Judicial Arbitration through Mediation Services of Orange County ("JAMS"), or any similar organization or entity conducting an alternate dispute resolution process. 34.2 In the event the Parties are unable to timely resolve the dispute through mediation, the issues in dispute shall be submitted to arbitration pursuant to California Code of Civil Procedure, Part 3, Title 9, Sections 1280 et seq. For such purpose, an agreed arbitrator shall be selected, or in the absence of agreement, each party shall select an arbitrator, and those two arbitrators shall select a third. Discovery may be conducted in connection with the arbitration proceeding pursuant to California Code of Civil Procedure Section 1283.05. The arbitrator, or three arbitrators acting as a board, shall take such evidence and make such investigation as deemed appropriate and shall render a written decision on the matter in question. The arbitrator shall decide each and every dispute in accordance with the laws of the State of California. The arbitrator's decision and award shall be subject to review for errors of fact or law in the Superior Court for the County of Orange, with a right of appeal from any judgment issued therein. 35. Attorney’s Fees. If any action at law or inequity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Orange County Sanitation District 10 of 12 Specification No.BSS-2026-728BD Contract, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which he may be entitled. 36. Survival. The provisions of this Contract dealing with Payment, Warranty, Indemnity, and Forum for Enforcement, shall survive termination or expiration of this Contract. 37. Severability. If any section, subsection, or provision of this Contract, or any agreement or instrument contemplated hereby, or the application of such section, subsection, or provision is held invalid, the remainder of this Contract or instrument in the application of such section, subsection or provision to persons or circumstances other than those to which it is held invalid, shall not be affected thereby, unless the effect of such invalidity shall be to substantially frustrate the expectations of the Parties. 38. Damage to OC San’s Property. To the extent any of OC San’s property is damaged by the negligence of Contractor, any subcontractors or by the personnel of either will be subject to repair or replacement by Contractor at no cost to OC San, except for that portion, if any, OC San’s actions contributed to the damage. 39. Disclosure. Contractor agrees not to disclose, to any third party, data or information generated from this project without the prior written consent from OC San. OC San agrees not to disclose, to any third party, Contractor data or information related this project without the prior written consent from Contractor, except to the extent required by a government agency. 40. Independent Contractor. The legal relationship between the parties hereto is that of an independent contractor, and nothing herein shall be deemed to make Contractor an OC San employee. During the performance of this Contract, Contractor and its officers, employees, and agents shall act in an independent capacity and shall not act as OC San's officers, employees, or agents. Contractor and its officers, employees, and agents shall obtain no rights to any benefits which accrue to OC San’s employees. 41. Limitations upon Subcontracting and Assignment. Contractor shall not delegate any duties nor assign any rights under this Contract without the prior written consent of OC San. Any such attempted delegation or assignment shall be void. 42. Third Party Rights. Nothing in this Contract shall be construed to give any rights or benefits to anyone other than OC San and Contractor. 43. Non-Liability of OC San Officers and Employees. No officer or employee of OC San shall be personally liable to Contractor, or any successor-in-interest, in the event of any default or breach by OC San or for any amount which may become due to Contractor or to its successor, or for breach of any obligation for the terms of this Contract. 44. Read and Understood. By signing this Contract, Contractor represents that he has read and understood the terms and conditions of the Contract. 45. Authority to Execute. The persons executing this Contract on behalf of the Parties warrant that they are duly authorized to execute this Contract and that by executing this Contract, the Parties are formally bound. 46. Entire Contract. This Contract constitutes the entire agreement of the Parties and supersedes all prior written or oral and all contemporaneous oral agreements, understandings, and negotiations between the Parties with respect to the subject matter hereof. Orange County Sanitation District 11 of 12 Specification No.BSS-2026-728BD 47. Notices. All notices under this Contract must be in writing. Written notice shall be delivered by personal service or sent by registered or certified mail, postage prepaid, return receipt requested, or by any other overnight delivery service which delivers to the noticed destination and provides proof of delivery to the sender. Rejection or other refusal to accept or the inability to deliver because of changed address for which no notice was given as provided hereunder shall be deemed to be receipt of the notice, demand or request sent. All notices shall be effective when first received at the following addresses: OC San: Jackie Lagade Purchasing Supervisor Orange County Sanitation District 18480 Bandilier Circle Fountain Valley, CA 92708 Contractor: Scott Buckhout Chief Executive Officer Cooper Machinery Services LLC 16250 Porth Northwest Drive Houston, Texas 77041 Each party shall provide the other party written notice of any change in address as soon as practicable. [Intentionally left blank. Signatures follow on the next page.] Orange County Sanitation District 12 of 12 Specification No.BSS-2026-728BD IN WITNESS WHEREOF, intending to be legally bound, the Parties hereto have caused this Contract to be signed by the duly authorized representatives. ORANGE COUNTY SANITATION DISTRICT Dated: _________________ By: Ryan P. Gallagher Chair, Board of Directors Dated: _________________ By: Kelly A. Lore Clerk of the Board Dated: _________________ By: Kevin Work Purchasing & Contracts Manager COOPER MACHINERY SERVICES LLC Dated: _________________ By: Print Name and Title of Officer JL 3/25/2026 1 Cen Gen Engine No. 1 Inspection and Repairs, Specification No. BSS-2026-728BD Riaz Moinuddin,Director of Operations & Maintenance Operations Committee April 1, 2026 CEN GEN ENGINES Provide heating for digesters and generate power for the treatment plant. On January 27, 2026, Engine No. 1 had a premature failure on cylinder 3 right (3R). 2 1 2 3/25/2026 2 Piston damage from previous failure in 2018 3 Cylinder wall Damage (2018) 4 3 4 3/25/2026 3 Initial inspections with a borescope on Engine No. 1 cylinder 3R show similar damage to one cylinder. Scope of work is to repair one piston/cylinder assembly and verify extent of damage. 5 Recommend to the Board of Directors to: A. Approve a Sole Source Service Contract with Cooper Machinery Services LLC for inspection and field service repairs to Central Generation (Cen Gen) Engine No. 1, Specification No. BSS-2026-728BD, for a total amount not to exceed $142,923, plus applicable sales tax and freight; and B. Approve additional allowance funding not to exceed $120,000 for associated repairs that may be required due to the high potential for additional damage identified during disassembly and inspection. Recommendation 6 5 6 OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4871 Agenda Date:4/22/2026 Agenda Item No:7. FROM:Robert Thompson, General Manager Originator: Riaz Moinuddin, Director of Operations & Maintenance SUBJECT: MASTER REIMBURSEMENT AGREEMENT FOR MANHOLE FRAME AND COVER OVERLAY GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Master Reimbursement Agreement with the City of Cypress, Specs. S-050A, S-055, and S-055A, establishing terms, procedures, and reimbursement for Orange County Sanitation District manhole frame and cover adjustments performed as part of Cypress Street Rehabilitation projects, in a standardized form approved by General Counsel; and B. Approve the Master Reimbursement Agreement Template and authorize the General Manager to execute future Master Reimbursement Agreements with other municipalities under similar terms, as approved by General Counsel. BACKGROUND Many municipalities routinely undertake street improvement projects to enhance pavement quality and roadway safety.These projects generally include asphalt resurfacing and related upgrades within existing rights-of-way. Orange County Sanitation District (OC San)owns and maintains approximately 4,400 manholes within the Orange County service area.As part of pavement resurfacing,these manholes often require elevation adjustments to meet final roadway grade.OC San is responsible for ensuring proper elevation to maintain both traffic safety and sewer system accessibility. Incorporating OC San’s manhole adjustment work into a municipality’s project scope is more efficient in terms of labor,time,and cost than performing the work separately.Under these agreements,OC San reimburses the municipality for the adjustment work. RELEVANT STANDARDS ·Protect OC San assets ·Maintain collaborative and cooperative relationships with regulators, stakeholders, and neighboring communities Orange County Sanitation District Printed on 4/14/2026Page 1 of 3 powered by Legistar™ File #:2026-4871 Agenda Date:4/22/2026 Agenda Item No:7. ·Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard PROBLEM OC San must currently negotiate and execute a separate reimbursement agreement for each municipal street rehabilitation project requiring manhole adjustments.This repetitive process is labor -intensive, time-consuming, and may delay project delivery. PROPOSED SOLUTION Approve a Master Reimbursement Agreement with the City of Cypress and approve a Master Reimbursement Agreement Template to establish standardized reimbursement terms and streamline the approval process by authorizing the General Manager to execute future qualifying agreements. TIMING CONCERNS N/A RAMIFICATIONS OF NOT TAKING ACTION If no action is taken,OC San will need to negotiate separate reimbursement agreements with multiple municipalities for each project,potentially causing delays.If OC San instead publicly bids and performs the work independently,costs would likely be higher due to restricted access to construction areas and additional street closures impacting the public. PRIOR COMMITTEE/BOARD ACTIONS N/A ADDITIONAL INFORMATION Under the agreement,OC San will supply manhole frames and covers and perform inspections to ensure the work meets OC San standards. CEQA N/A FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget Update FY 2025-26,Page 33,Repairs &Maintenance)and the budget is sufficient for the recommended action. Orange County Sanitation District Printed on 4/14/2026Page 2 of 3 powered by Legistar™ File #:2026-4871 Agenda Date:4/22/2026 Agenda Item No:7. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Master Reimbursement Agreement - City of Cypress ·Master Reimbursement Agreement - Template ·Presentation Orange County Sanitation District Printed on 4/14/2026Page 3 of 3 powered by Legistar™ 55880.00002\43166451.1 Page 1 of 7 MASTER REIMBURSEMENT AGREEMENT BETWEEN CITY OF CYPRESS AND ORANGE COUNTY SANITATION DISTRICT This cooperative cost reimbursement agreement (“Agreement”) is made and entered into as of (“Effective Date”), by and between the City of Cypress (a municipal corporation organized and operating under the laws of the State of California with its principal place of business at 5275 Orange Avenue, Cypress California 90630) (“City”) and Orange County Sanitation District (a municipal corporation organized and operating under the laws of the State of California with its principal place of business at 18480 Bandilier Circle, Fountain Valley, California 92708) (“OC San”). City and OC San are hereinafter sometimes referred to individually as “Party” and collectively as the “Parties”. RECITALS WHEREAS, City initiates any particular street rehabilitation project ("Project") to improve pavement conditions City-wide; and WHEREAS, City’s Projects routinely involve the adjustment of OC San’s manhole frames and covers (“Manhole Adjustments”) that are within the Project’s area; and WHEREAS, City has agreed to perform the Manhole Adjustments as part of its Projects and seek reimbursement from OC San for the costs associated with the Manhole Adjustments (“Manhole Adjustment Costs”); and WHEREAS, OC San has agreed to reimburse City for the Manhole Adjustment Costs; and WHEREAS, the Parties desire to enter into this Agreement to establish the general terms for OC San to reimburse the City for the Manhole Adjustment Costs. NOW, THEREFORE, the Parties agree as follows: AGREEMENT 1. Incorporation of Recitals. The recitals above are true and correct, and are hereby incorporated herein by this reference. 2. Scope of Agreement. This Agreement applies to any City Project that involves Manhole Adjustments. For each Project where Manhole Adjustments are required, the City will include the Adjustment Work in its Project scope. 3. Term. This Agreement shall commence on the Effective Date and continue for a term of ten (10) years from the Effective Date, unless terminated earlier in accordance with Section 16, below. 55880.00002\43166451.1 Page 2 of 7 4. Reimbursement. OC San’s obligation to reimburse City includes the actual total costs for construction of the Adjustment Work for each Project, plus an Administrative Fee of up to fifteen percent (15%) of the total costs of the Adjustment Work for each Project. The “Administrative Fee” is intended to cover the City’s internal costs related to administration of the Adjustment Work. a. For each Project, the anticipated costs shall be presented to OC San in the form of a Work Order, which will include all relevant scope and costs. The parties shall execute each Work Order prior to, or concurrent with, the City’s Project activities. b. Work Orders may be executed by the City’s Director of Public Works, or their designee, pursuant to the requirements of this Master Agreement. Such Work Orders may be made in the form of letter agreements or instruments as agreed between the Parties. c. In any event, failure of the Parties to execute a Work Order shall not relieve OC San from obligation to pay for Manhole Adjustment Costs which are necessarily incurred as a result of City Projects, subject to City responsibilities outlined below. 5. Timing of Reimbursement. For completion of the Project, City shall submit an invoice to OC San setting forth the cost for the Adjustment Work and the amount of the Administrative Fee. Invoices shall be accompanied by a copy of appropriate documentation to substantiate the amounts included in the invoice. OC San shall provide reimbursement funds to City within thirty (30) calendar days of receipt of all required invoices and supporting documentation. 6. City Responsibilities. For each applicable Project, the City shall: a. Be responsible for compliance with the California Environmental Quality Act and all other permitting requirements. b. Where applicable, advertise for bids, hire a contractor, approve the work, and administer the contract for City’s Project which includes the Manhole Adjustment work. c. Include a separate line item in its bid documents for the Manhole Adjustment work. This line item will be identified and labelled as “Adjust OC San Manholes per OC San Standard Drawings S-050A, S-055 and S-055A” or similar designation. d. Allow OC San a period of two (2) weeks to review the proposed bid unit prices for Manhole Adjustment work. OC San reserves the right to decide, based on this review, whether to proceed with the reimbursement process or to make other arrangements to complete the Manhole Adjustment work. 55880.00002\43166451.1 Page 3 of 7 e. Provide written notification to OC San at least thirty (30) days prior to the commencement of any Project that will involve the Manhole Adjustment work. f. Include detailed information in the Project plans and specification indicating the location and the requirements for the Manhole Adjustments. The Project plans and specification shall also reference OC San’s standard drawings S-050A, S-055 and S-055A, or versions of the standards as published by OC San at the time of the construction, for the Adjustment Work. The current version of such standards are attached hereto as Exhibit A. g. Provide OC San staff with contractor schedules and updates within five (5) days of acceptance by City staff. h. Invite OC San staff to construction progress meetings. i. Notify OC San seventy-two (72) business hours prior to the need for an inspection. j. Ensure the City’s construction contractor coordinates with OC San to retrieve the manhole frames and covers for the Manhole Adjustment work (provided by OC San) from the OC San Treatment Plant No. 1 in Fountain Valley. k. Coordinate with OC San to ensure proper timing for OC San’s inspectors to be present during the Manhole Adjustment process. l. Obtain written approval from OC San for any change orders for Manhole Adjustment work prior to implementation. m. Document and inform OC San of the date of the completion of the Manhole Adjustment Work. City will verify with OC San prior to issuance of progress payment to City’s construction contractor that Manhole Adjustment work was completed per the standards. 7. OC San Responsibilities. For each applicable Project, OC San shall: a. Provide, at OC San’s expense, new frames and covers to replace the existing frames and covers. b. Provide, at OC San’s expense, inspection services to ensure compliance with the standards. OC San will promptly notify City if any portion of the Manhole Adjustment work appears not to conform to the standards and will work with the City to resolve all discrepancies. c. Respond to City’s request for an inspection within two (2) business days, excluding federal and local holidays. OC San will be responsible for the City’s construction contractor’s downtime due to failure to comply with this provision. 55880.00002\43166451.1 Page 4 of 7 8. Indemnification. Each Party shall indemnify, defend, and hold the other Party (its officials, officers, employees, agents, consultants, and contractors) free and harmless from any and all claims (demands, causes of action, costs, expenses, liabilities, losses, damages or injuries in law or in equity to property or persons including wrongful death) in any manner arising out of or incident to any negligent acts or omissions or willful misconduct of the indemnifying Party (its officials, officers, employees, agents, consultants, or contractors) in the performance of the indemnifying Party’s obligations under this Agreement (including the payment of all reasonable attorneys’ fees). 9. Notice. Any notice or instrument required to be given or delivered by this Agreement may be given or delivered by depositing the same in any United States Post Office, certified mail, return receipt requested, postage prepaid, addressed to the following addresses and shall be effective upon receipt thereof: CITY: City of Cypress 5275 Orange Avenue, Cypress, CA 90630 Attn: City Clerk OC SAN: Orange County Sanitation District 18480 Bandilier Circle Fountain Valley, CA 92708 Attn: Clerk of the Board 10. Force Majeure. Neither Party will be liable for any delays or other non- performance resulting from circumstances or causes beyond its reasonable control (including without limitation fire or other casualty, act of God, strike or labor dispute, war or other violence, acts of third parties, or any law, order, or requirement of any governmental agency or authority other than the Parties). 11. Laws and Venue. This Agreement shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or Federal court situated in the County of Orange, State of California. 12. Entire Agreement. This Agreement represents the entire understanding of the Parties as to those matters contained herein; and supersedes and cancels any prior or contemporaneous oral or written understanding, promises, or representations with respect to those matters covered hereunder. Each Party acknowledges that no representations, inducements, promises, or agreements have been made by any person which are not incorporated herein; and that any other agreements shall be void. This is an integrated Agreement. 13. Severability. If any provision of this Agreement is determined by a court of competent jurisdiction to be invalid, illegal, or unenforceable for any reason, such determination shall not affect the validity or enforceability of the remaining terms and 55880.00002\43166451.1 Page 5 of 7 provisions hereof or of the offending provision in any other circumstance; and the remaining provisions of this Agreement shall remain in full force and effect. 14. Successors and Assigns. This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators, and assigns of each Party to this Agreement. 15. Non-Waiver. The delay or failure of either Party at any time to require performance or compliance by the other Party of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the Party against whom enforcement of a waiver is sought. The waiver of any right or remedy with respect to any occurrence or event shall not be deemed a waiver of any right or remedy with respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver. 16. Termination. This Agreement may be terminated by the Parties upon thirty (30) days written notice of termination. In such event, City shall be entitled to receive reimbursement for any and all outstanding Manhole Adjustment Costs incurred prior to termination. 17. Time of Essence. Time is of the essence for each and every provision of this Agreement. 18. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain, or to be a full or accurate description of the content thereof; and shall not in any way affect the meaning or interpretation of this Agreement. 19. Amendments. Only a writing executed by all of the Parties hereto or their respective successors and assigns may amend this Agreement. 20. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one single Agreement. 21. Authority. The persons executing this Agreement on behalf of the Parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said Parties and that by doing so, the Parties hereto are formally bound to the provisions of this Agreement. 22. Electronic Signature. Each Party acknowledges and agrees that this Agreement may be executed by electronic or digital signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature. 55880.00002\43166451.1 Page 6 of 7 SIGNATURE PAGE FOR MASTER REIMBURSEMENT AGREEMENT BETWEEN CITY OF CYPRESS AND ORANGE COUNTY SANITATION DISTRICT IN WITNESS WHEREOF, the Parties are signing this Agreement as of the Effective Date. ORANGE COUNTY SANITATION DISTRICT CITY OF CYPRESS Date: By: ______________________________ Ryan P. Gallagher Board Chairman Date: By: Sean Joyce, Interim City Manager ATTEST Date: By: Kelly A. Lore, MMC Clerk of the Board ATTEST Date: By: City Clerk APPROVED AS TO FORM: APPROVED AS TO FORM: CITY ATTORNEY’S OFFICE Date: By: _______________________________ By: _______________________________ Scott C. Smith OC San General Counsel Fred Galante Date: 55880.00002\43166451.1 Page 7 of 7 EXHIBIT A Standard Drawings Michael Dorman Digitally signed by Michael DormanDate: 2024.01.04 13:26:24-08'00' 55880.00002\43166451.1 Page 1 of 7 MASTER REIMBURSEMENT AGREEMENT BETWEEN CITY OF XXX AND ORANGE COUNTY SANITATION DISTRICT This cooperative cost reimbursement agreement (“Agreement”) is made and entered into as of _____________ (“Effective Date”), by and between the City of XXX (a municipal corporation organized and operating under the laws of the State of California with its principal place of business at XXXX) (“City”) and Orange County Sanitation District (a municipal corporation organized and operating under the laws of the State of California with its principal place of business at 18480 Bandilier Circle, Fountain Valley, California 92708) (“OC San”). City and OC San are hereinafter sometimes referred to individually as “Party” and collectively as the “Parties”. RECITALS WHEREAS, City initiates any particular street rehabilitation project ("Project") to improve pavement conditions City-wide; and WHEREAS, City’s Projects routinely involve the adjustment of OC San’s manhole frames and covers (“Manhole Adjustments”) that are within the Project’s area; and WHEREAS, City has agreed to perform the Manhole Adjustments as part of its Project and seek reimbursement from OC San for the costs associated with the Manhole Adjustments (“Manhole Adjustment Costs”); and WHEREAS, OC San has agreed to reimburse City for the Manhole Adjustment Costs; and WHEREAS, the Parties desire to enter into this Agreement to establish the general terms for OC San to reimburse the City for the Manhole Adjustment Costs. NOW, THEREFORE, the Parties agree as follows: AGREEMENT 1. Incorporation of Recitals. The recitals above are true and correct, and are hereby incorporated herein by this reference. 2. Scope of Agreement. This Agreement applies to any City Project that involves Manhole Adjustments. For each Project where Manhole Adjustments are required, the City will include the Adjustment Work in its Project scope. 3. Term. This Agreement shall commence on the Effective Date and continue for a term of ten (10) years from the Effective Date, unless terminated earlier in accordance with Section 16, below. 55880.00002\43166451.1 Page 2 of 7 4. Reimbursement. OC San’s obligation to reimburse City includes the actual total costs for construction of the Adjustment Work for each Project, plus an Administrative Fee of up to fifteen percent (15%) of the total costs of the Adjustment Work for each Project. The “Administrative Fee” is intended to cover the City’s internal costs related to administration of the Adjustment Work. a. For each Project, the anticipated costs shall be presented to OC San in the form of a Work Order, which will include all relevant scope and costs. The parties shall execute each Work Order prior to, or concurrent with, the City’s Project activities. b. Work Orders may be executed by the City’s Executive Director of Public Works, or their designee, pursuant to the requirements of this Master Agreement. Such Supplemental Agreements may be made in the form of letter agreements or instruments as agreed between the Parties. c. In any event, failure of the Parties to execute a Work Order shall not relieve OC San from obligation to pay for Manhole Adjustment Costs which are necessarily incurred as a result of City Projects, subject to City responsibilities outlined below. 5. Timing of Reimbursement. For completion of the Project, City shall submit an invoice to OC San setting forth the cost for the Adjustment Work and the amount of the Administrative Fee. Invoices shall be accompanied by a copy of appropriate documentation to substantiate the amounts included in the invoice. OC San shall provide reimbursement funds to City within thirty (30) calendar days of receipt of all required invoices and supporting documentation. 6. City Responsibilities. For each applicable Project, the City shall: a. Be responsible for compliance with the California Environmental Quality Act and all other permitting requirements. b. Where applicable, advertise for bids, hire a contractor, approve the work, and administer the contract for City’s Project which includes the Manhole Adjustment work. c. Include a separate line item in its bid documents for the Manhole Adjustment work. This line item will be identified and labelled as “Adjust OC San Manholes per OC San Standard Drawings S-050A, S-055 and S-055A” or similar designation. d. Allow OC San a period of two (2) weeks to review the proposed bid unit prices for Manhole Adjustment work. OC San reserves the right to decide, based on this review, whether to proceed with the reimbursement process or to make other arrangements to complete the Manhole Adjustment work. 55880.00002\43166451.1 Page 3 of 7 e. Provide written notification to OC San at least thirty (30) days prior to the commencement of any Project that will involve the Manhole Adjustment work. f. Include detailed information in the Project plans and specification indicating the location and the requirements for the Manhole Adjustments. The Project plans and specification shall also reference OC San’s standard drawings S-050A, S-055 and S-055A, or versions of the standards as published by OC San at the time of the construction, for the Adjustment Work. The current version of such standards are attached hereto as Exhibit A. g. Provide OC San staff with contractor schedules and updates within five (5) days of acceptance by City staff. h. Invite OC San staff to construction progress meetings. i. Notify OC San seventy-two (72) business hours prior to the need for an inspection. j. Ensure the City’s construction contractor coordinates with OC San to retrieve the manhole frames and covers for the Manhole Adjustment work (provided by OC San) from the OC San Treatment Plant No. 1 in Fountain Valley. k. Coordinate with OC San to ensure proper timing for OC San’s inspectors to be present during the Manhole Adjustment process. l. Obtain written approval from OC San for any change orders for Manhole Adjustment work prior to implementation. m. Document and inform OC San of the date of the completion of the Manhole Adjustment Work. City will verify with OC San prior to issuance of progress payment to City’s construction contractor that Manhole Adjustment work was completed per the standards. 7. OC San Responsibilities. For each applicable Project, OC San shall: a. Provide, at OC San’s expense, new frames and covers to replace the existing frames and covers. b. Provide, at OC San’s expense, inspection services to ensure compliance with the standards. OC San will promptly notify City if any portion of the Manhole Adjustment work appears not to conform to the standards and will work with the City to resolve all discrepancies. c. Respond to City’s request for an inspection within two (2) business days, excluding federal and local holidays. OC San will be responsible for the City’s construction contractor’s downtime due to failure to comply with this provision. 55880.00002\43166451.1 Page 4 of 7 8. Indemnification. Each Party shall indemnify, defend, and hold the other Party (its officials, officers, employees, agents, consultants, and contractors) free and harmless from any and all claims (demands, causes of action, costs, expenses, liabilities, losses, damages or injuries in law or in equity to property or persons including wrongful death) in any manner arising out of or incident to any negligent acts or omissions or willful misconduct of the indemnifying Party (its officials, officers, employees, agents, consultants, or contractors) in the performance of the indemnifying Party’s obligations under this Agreement (including the payment of all reasonable attorneys’ fees). 9. Notice. Any notice or instrument required to be given or delivered by this Agreement may be given or delivered by depositing the same in any United States Post Office, certified mail, return receipt requested, postage prepaid, addressed to the following addresses and shall be effective upon receipt thereof: CITY: TBD OC SAN: Orange County Sanitation District 18480 Bandilier Circle Fountain Valley, CA 92708 10. Force Majeure. Neither Party will be liable for any delays or other non-performance resulting from circumstances or causes beyond its reasonable control (including without limitation fire or other casualty, act of God, strike or labor dispute, war or other violence, acts of third parties, or any law, order, or requirement of any governmental agency or authority other than the Parties). 11. Laws and Venue. This Agreement shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or Federal court situated in the County of Orange, State of California. 12. Entire Agreement. This Agreement represents the entire understanding of the Parties as to those matters contained herein; and supersedes and cancels any prior or contemporaneous oral or written understanding, promises, or representations with respect to those matters covered hereunder. Each Party acknowledges that no representations, inducements, promises, or agreements have been made by any person which are not incorporated herein; and that any other agreements shall be void. This is an integrated Agreement. 13. Severability. If any provision of this Agreement is determined by a court of competent jurisdiction to be invalid, illegal, or unenforceable for any reason, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance; and the remaining provisions of this Agreement shall remain in full force and effect. 55880.00002\43166451.1 Page 5 of 7 14. Successors and Assigns. This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators, and assigns of each Party to this Agreement. 15. Non-Waiver. The delay or failure of either Party at any time to require performance or compliance by the other Party of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the Party against whom enforcement of a waiver is sought. The waiver of any right or remedy with respect to any occurrence or event shall not be deemed a waiver of any right or remedy with respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver. 16. Termination. This Agreement may be terminated by the Parties upon thirty (30) days written notice of termination. In such event, City shall be entitled to receive reimbursement for any and all outstanding Manhole Adjustment Costs incurred prior to termination. 17. Time of Essence. Time is of the essence for each and every provision of this Agreement. 18. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain, or to be a full or accurate description of the content thereof; and shall not in any way affect the meaning or interpretation of this Agreement. 19. Amendments. Only a writing executed by all of the Parties hereto or their respective successors and assigns may amend this Agreement. 20. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one single Agreement. 21. Authority. The persons executing this Agreement on behalf of the Parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said Parties and that by doing so, the Parties hereto are formally bound to the provisions of this Agreement. 22. Electronic Signature. Each Party acknowledges and agrees that this Agreement may be executed by electronic or digital signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature. 55880.00002\43166451.1 Page 6 of 7 SIGNATURE PAGE FOR MASTER REIMBURSEMENT AGREEMENT BETWEEN CITY OF XXX AND ORANGE COUNTY SANITATION DISTRICT IN WITNESS WHEREOF, the Parties are signing this Agreement as of the Effective Date. ORANGE COUNTY SANITATION DISTRICT CITY OF XXX By: ______________________________ Robert C. Thompson General Manager By: xxxx City Manager ATTEST Date: By: Kelly A. Lore, MMC ATTEST Date: By: xxx APPROVED AS TO FORM: APPROVED AS TO FORM: CITY ATTORNEY’S OFFICE Date: 55880.00002\43166451.1 Page 7 of 7 EXHIBIT A Standard Drawings 3/24/2026 1 Master Reimbursement Agreements Presented by: Nicholas Oswald, Maintenance Manager Operations Committee April 1, 2026 •Defines how OC San coordinates and reimburses manhole adjustments in city projects •Establishes a standardized agreement across municipalities •Ensures consistent quality, communication, and coordination across projects •Streamlines approvals and reduces project delays •Supports timely and efficient project delivery Purpose of the Master Reimbursement Agreement 2 1 2 3/24/2026 2 Benefits to a Templated Master Reimbursement Agreement 3 •Improves project efficiency by integrating work with city street projects •Covers OC San's actual costs plus up to a 15 percent administrative fee •Enhances communication and coordination with municipalities •Ensures quality through OC San-provided materials and inspections •Minimizes repetitive approvals with a long-term agreement approach Impacts Without the Agreement 4 •Higher costs due to separate construction and public bidding •Project delays from repeated agreement negotiations •Increased public disruption from additional street closures •Reduced coordination leading to inefficiencies and scheduling conflicts 3 4 3/24/2026 3 Streamlining Approval 5 •Allows GM to execute agreements •Reduces delays and returns agreements to municipalities faster •Enables cities to meet their council and committee approval timelines •Maintains oversight through reporting to OC San Operations Committee/Board •Improves overall efficiency and project delivery timelines Recommend to the Board of Directors to: A. Approve a Master Reimbursement Agreement with the City of Cypress,Specs. S-050A, S-055, and S-055A, establishing terms, procedures, andreimbursement for Orange County Sanitation District manhole frame andcover adjustments performed as part of Cypress Street Rehabilitation projects, in a standardized form approved by General Counsel; and B. Approve the Master Reimbursement Agreement Template and authorize the General Manager to execute future Master Reimbursement Agreements with other municipalities under similar terms, as approved by General Counsel. Recommendation 6 5 6 OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2026-4872 Agenda Date:4/22/2026 Agenda Item No:8. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: HEADWORKS ELECTRICAL DISTRIBUTION IMPROVEMENTS AT PLANT NO.2,PROJECT NO. P2-141 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a project budget increase of $11,848,000 for Headworks Electrical Distribution Improvements at Plant No. 2, Project No. P2-141, for a total project budget of $46,500,000; B. Approve a Progressive Design-Build Contract with Big Sky Electric, Inc./Filanc, a Joint Venture, to provide Phase 1 progressive design-build services for Headworks Electrical Distribution Improvements at Plant No. 2, Project No. P2-141, for an amount not to exceed $3,902,200; and C. Approve an upper limit for this Contract of $39,710,000, which includes contingency. BACKGROUND The headworks of a wastewater treatment plant is where incoming sewer flows converge through a series of pipes,meters,flow diversions,and gates as part of the preliminary treatment process.At Orange County Sanitation District’s (OC San)Reclamation Plant No.2,the headworks blends sewage from four trunk lines before it enters the treatment process. Distribution Center H (DC-H) at Plant No. 2 houses the electrical distribution equipment that provides power and control to the headworks facilities through its switchgear and motor control centers.Power and control cables from DC-H are routed to the headworks process areas through an underground duct bank system that connects the various facilities. RELEVANT STANDARDS ·24/7/365 treatment plant reliability ·Ensure the public’s money is wisely spent ·Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard Orange County Sanitation District Printed on 4/14/2026Page 1 of 7 powered by Legistar™ File #:2026-4872 Agenda Date:4/22/2026 Agenda Item No:8. PROBLEM Over the past five years,several critical pieces of equipment at the headworks facilities have experienced shutdowns due to a steadily increasing rate of low-voltage power and control cable failure.Initially,failed cables were replaced through the execution of numerous smaller cable replacement projects, and nearly all spare conductors and conduits have been utilized. A condition assessment of the underground duct bank system identified several existing and spare conduits as blocked and unusable due to the failure of the fiberglass conduits.The ability to reuse existing underground conduits is significantly constrained. Recently,temporary replacement cables have been routed above ground due to the lack of available buried duct bank conduits.These temporary installations create operational and safety concerns, including potential tripping hazards,roadway restrictions,and reduce the reliability of the headworks electrical distribution system. In addition to the cable failure issues,variable frequency drives for the seven (7)main sewage pumps and sixteen (16)odor control fans are obsolete and have reached the end of their useful life. The main sewage pump vibration monitoring is also obsolete. PROPOSED SOLUTION Approve a Progressive Design-Build (PDB)contract to replace and reroute all low-voltage power and control cables serving the headworks.The project will also replace obsolete variable frequency drives and vibration monitoring equipment. TIMING CONCERNS Delaying approval of this contract will postpone the replacement of failed or failing cables,obsolete variable frequency drives,and obsolete vibration monitoring equipment,which could affect the operational reliability of the headworks facilities at Plant No. 2. RAMIFICATIONS OF NOT TAKING ACTION Based on experience,if no action is taken,it is anticipated that cable failures will continue to affect the reliability of the headworks facilities at Plant No.2.The variable frequency drives could fail, resulting in an urgent project to replace them.The vibration monitoring equipment could also fail, resulting in lack of critical equipment protection.The above-ground cable installations will remain in place due to the lack of available conduits,creating ongoing safety concerns such as tripping hazards and limiting safe access for operations and maintenance staff. PRIOR COMMITTEE/BOARD ACTIONS N/A Orange County Sanitation District Printed on 4/14/2026Page 2 of 7 powered by Legistar™ File #:2026-4872 Agenda Date:4/22/2026 Agenda Item No:8. ADDITIONAL INFORMATION Design Builder Selection: On May 15,2025,OC San hosted a Market Sounding event to assess the industry interest in the project and gather feedback from potential proposers before the Request for Proposal (RFP)was published.The event was advertised in OC San’s Vendor Portal in PlanetBids.The event was well attended with over forty attendees from different design consultants,design-build firms,and contractors. OC San held one-on-one meetings with seven interested firms from May 21,2025,to May 29,2025. The purpose of the meetings was to discuss information presented at the Market Sounding event, such as potential risks,project schedule,technical requirements,insurance requirements, commercial terms,and other factors that may have prevented firms from submitting a proposal for the project. On September 16,2025,OC San issued a Request for Proposals (RFP)to procure the work and services outlined in the project scope of work.The RFP was publicly advertised in the Orange County Register,and an electronic notification was sent to multiple firms through OC San’s Vendor Portal in PlanetBids. The RFP described the following evaluation criteria,which were used to determine the most qualified Design-Builder. Description Points Technical Proposal Evaluation Criteria Proposer Profile and Minimum Requirements Responsive or Non- Responsive Project Understanding and Key Issues 20 Project Team and Key Personnel 25 Project Experience and References 20 Project Delivery and Management Approach 20 Cost Development and Procurement Approach 5 Technical Proposal Maximum Score 90 Price Proposal Evaluation Criteria Phase 2 Design-Builder’s Fee Percentage 10 Price Proposal Maximum Score 10 TOTAL PROPOSAL MAXIMUM SCORE 100 This procurement and subsequent evaluation were conducted as a one-step,best-value solicitation in accordance with Section 22185 of the Public Contracting Code and under the guidance of OC San's Owner-Advisor. OC San offered optional Proprietary Meetings to provide prospective proposers with an opportunity to ask questions regarding the project technical requirements,draft Contract Documents,and draft RFP. Prospective proposers also used the time to describe preliminary technical concepts,preliminary project delivery approaches,and/or proposed changes in the Contract Documents.Five ProprietaryOrange County Sanitation District Printed on 4/14/2026Page 3 of 7 powered by Legistar™ File #:2026-4872 Agenda Date:4/22/2026 Agenda Item No:8. project delivery approaches,and/or proposed changes in the Contract Documents.Five Proprietary Meetings were held on October 7, 8, and 9, 2025. Four proposals were received on November 12,2025,and evaluated in accordance with the evaluation process set forth in OC San’s Purchasing Ordinance (OC SAN-61)by a pre-selected Evaluation Team consisting of OC San staff,which included a Senior Engineer (Project Manager),a Senior Engineer (Project Engineer),an Engineering Manager,an Engineering Supervisor,and a Maintenance Superintendent. The Evaluation Team also included four non-voting representatives:two from the Contracts Administration Division and two members from the Owner Advisor. Below is the summary of Technical Proposal scores with a maximum of ninety (90) points. Proposer Big Sky Electric, Inc./Filanc, a Joint Venture CDM Smith, Inc.LEED Electric, Inc. Shimmick Construction Company, Inc. Project Understanding & Key Issues (Max. 20 Points) 17.20 16.00 14.00 12.00 Project Team & Key Personnel (Max. 25 Points) 20.50 17.50 18.00 17.50 Project Experience & References (Max. 20 Points) 16.40 14.40 12.80 12.00 Project Delivery & Management Approach (Max. 20 Points) 16.40 15.60 13.20 16.00 Cost Development & Procurement Approach (Max. 5 Points) 4.50 4.60 4.50 4.30 Total Score (Max. 90 Points) 75.00 68.10 62.50 61.80 On December 15,2025,Contracts staff opened the Price Proposals of the two (2)highest-scoring firms and reviewed them for responsiveness. Both Price Proposals received were responsive. Interviews were conducted on December 16,2025,and December 17,2025.After the interviews,the Evaluation Committee scored the two Proposers on both their written technical proposal and interview.On December 18,2025,the Evaluation Committee provided their final scores,and all evaluators agreed regarding the scores and overall ranking of the Proposers.Below is the summary of the final Technical Proposal scores. Orange County Sanitation District Printed on 4/14/2026Page 4 of 7 powered by Legistar™ File #:2026-4872 Agenda Date:4/22/2026 Agenda Item No:8. Proposer Big Sky Electric, Inc./Filanc, a Joint Venture CDM Smith, Inc. Project Understanding & Key Issues (Max. 20 Points) 17.2 16.8 Project Team & Key Personnel (Max. 25 Points)22.5 17.5 Project Experience & References (Max. 20 Points) 18 15.6 Project Delivery & Management Approach (Max. 20 Points)17.6 16.4 Cost Development & Procurement Approach (Max. 5 Points) 4.6 4.3 Total Score (Max. 90 Points)79.9 70.6 The Price Proposals were kept confidential and were not disclosed to the Evaluation Committee until after the Technical Proposal scores were finalized.On December 18,2025,Contracts staff evaluated the Price Proposals using the cost scoring method established in the RFP.The table below summarizes the Price Proposal scores. Proposer Phase 2 Design-Builder’s Fee Score (Max. 10 Points) Big Sky Electric, Inc./ a Joint Venture 8.57 CDM Smith, Inc.10.00 On December 18,2025,the Evaluation Committee convened,and Contracts staff provided the Price Proposal score to the Evaluation Committee after receiving the final Technical Proposal scores. Contracts staff proceeded with adding the Price Proposal score to the final Technical Proposal score. The table below shows the summary of the final total Proposal scores. Proposer Big Sky Electric, Inc./Filanc, a Joint Venture CDM Smith, Inc. Project Understanding & Key Issues (Max. 20 Points) 17.2 16.8 Project Team & Key Personnel (Max. 25 Points)22.5 17.5 Project Experience & References (Max. 20 Points) 18 15.6 Project Delivery & Management Approach (Max. 20 Points)17.6 16.4 Cost Development & Procurement Approach (Max. 5 Points) 4.6 4.3 Phase 2 Design-Builder's Fee (Max. 10 Points)8.57 10 Total Score (Max. 100 Points)88.47 80.6 The Best-Value Proposer was selected based on a range of factors,including technical design,Orange County Sanitation District Printed on 4/14/2026Page 5 of 7 powered by Legistar™ File #:2026-4872 Agenda Date:4/22/2026 Agenda Item No:8. The Best-Value Proposer was selected based on a range of factors,including technical design, construction expertise,financial record,skilled labor force availability,safety record,and competitive fee. In its technical proposal and oral interview,Big Sky Electric,Inc./Filanc,a Joint Venture, demonstrated a clear understanding of the scope of work,strong technical capabilities as well as a novel design alternative and procurement approach that can advance project completion.The team also demonstrated familiarity with Reclamation Plant No.2 and experience coordinating with Operations and Maintenance staff,which will support a collaborative project environment,minimize risks, and expedite project delivery. Therefore,the Evaluation Team determined that Big Sky Electric,Inc./Filanc,a Joint Venture,is the best-value and most qualified Design-Builder to successfully complete the scope of work. Negotiations: Based on the Evaluation Committee’s recommendation,the Director of Engineering authorized the start of negotiations on December 18,2025,with the highest-ranking proposer,Big Sky Electric, Inc./Filanc, a Joint Venture. Staff conducted negotiations with Big Sky Electric,Inc./Filanc,a Joint Venture,to clarify the scope of work,contractual requirements,key assumptions,and the proposed approach to meet the goals and objectives for the project. Several meetings were held during negotiations.The scope was revised to include additional vibration monitoring design services for the existing Main Sewage Pumps (MSPs).Scope assumptions were better clarified, and the Phase 1 schedule was updated accordingly. Original Amount Final Negotiated Amount Phase 1 Services $3,988,000 $3,902,200 The Design-Builder proposed several exceptions to the contract,including provisions related to limitation of liability and indemnification.These exceptions were reviewed,revised,and approved during negotiations by the Legal Counsel and Risk Management teams from both OC San and the Design-Builder. Based on the results of these negotiations,staff determined that the final negotiated fee is fair and reasonable for this project and recommends awarding the PDB Contract to Big Sky Electric, Inc./Filanc, a Joint Venture. The main sewage pump vibration monitoring equipment was added after the original construction budget was established.The variable frequency drive cost estimate had incorrect costs entered for material and labor.Together,these cost differences total approximately $10M.Additionally,copper prices have increased approximately 25%in the past year.Finally,the Phase 1 cost was based on a lower construction cost,and did not include the detailed field investigation work recommended by the Design-Builder.A budget increase of $11,848,000 is recommended to provide sufficient funds for the PDB contract upper limit. Orange County Sanitation District Printed on 4/14/2026Page 6 of 7 powered by Legistar™ File #:2026-4872 Agenda Date:4/22/2026 Agenda Item No:8. CEQA The project is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations sections 15301.A Notice of Exemption will be filed with the OC Clerk-Recorder and State Clearinghouse after the General Manager approval of the Guaranteed Maximum Price Amendment. FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget Update FY 2025-26,Page A-7,Headworks Electrical Distribution Improvements at Plant No.2,Project No.P2-141).The project budget increase will be included in the budget approval process for the upcoming fiscal year. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Professional Design-Build Contract ·Presentation OP:lb Orange County Sanitation District Printed on 4/14/2026Page 7 of 7 powered by Legistar™ ORANGE COUNTY SANITATION DISTRICT COMMON ACRONYMS ACWA Association of California Water Agencies LOS Level Of Service RFP Request For Proposal APWA American Public Works Association MGD Million Gallons Per Day RWQCB Regional Water Quality Control Board AQMD Air Quality Management District MOU Memorandum of Understanding SARFPA Santa Ana River Flood Protection Agency ASCE American Society of Civil Engineers NACWA National Association of Clean Water Agencies SARI Santa Ana River Interceptor BOD Biochemical Oxygen Demand NEPA National Environmental Policy Act SARWQCB Santa Ana Regional Water Quality Control Board CARB California Air Resources Board NGOs Non-Governmental Organizations SAWPA Santa Ana Watershed Project Authority CASA California Association of Sanitation Agencies NPDES National Pollutant Discharge Elimination System SCADA Supervisory Control And Data Acquisition CCTV Closed Circuit Television NWRI National Water Research Institute SCAP Southern California Alliance of Publicly Owned CEQA California Environmental Quality Act O & M Operations & Maintenance SCAQMD South Coast Air Quality Management District CIP Capital Improvement Program OCCOG Orange County Council of Governments SOCWA South Orange County Wastewater Authority CRWQCB California Regional Water Quality Control Board OCHCA Orange County Health Care Agency SRF Clean Water State Revolving Fund CWA Clean Water Act OCSD Orange County Sanitation District SSMP Sewer System Management Plan CWEA California Water Environment Association OCWD Orange County Water District SSO Sanitary Sewer Overflow EIR Environmental Impact Report OOBS Ocean Outfall Booster Station SWRCB State Water Resources Control Board EMT Executive Management Team OSHA Occupational Safety and Health Administration TDS Total Dissolved Solids EPA US Environmental Protection Agency PCSA Professional Consultant/Construction TMDL Total Maximum Daily Load FOG Fats, Oils, and Grease PDSA Professional Design Services Agreement TSS Total Suspended Solids gpd gallons per day PFAS Per- and Polyfluoroalkyl Substances WDR Waste Discharge Requirements GWRS Groundwater Replenishment System PFOA Perfluorooctanoic Acid WEF Water Environment Federation ICS Incident Command System PFOS Perfluorooctanesulfonic Acid WERF Water Environment & Reuse Foundation IERP Integrated Emergency Response Plan POTW Publicly Owned Treatment Works WIFIA Water Infrastructure Finance and Innovation Act JPA Joint Powers Authority ppm parts per million WIIN Water Infrastructure Improvements for the LAFCO Local Agency Formation Commission PSA Professional Services Agreement WRDA Water Resources Development Act ORANGE COUNTY SANITATION DISTRICT GLOSSARY OF TERMS ACTIVATED SLUDGE PROCESS – A secondary biological wastewater treatment process where bacteria reproduce at a high rate with the introduction of excess air or oxygen and consume dissolved nutrients in the wastewater. BENTHOS – The community of organisms, such as sea stars, worms, and shrimp, which live on, in, or near the seabed, also known as the benthic zone. BIOCHEMICAL OXYGEN DEMAND (BOD) – The amount of oxygen used when organic matter undergoes decomposition by microorganisms. Testing for BOD is done to assess the amount of organic matter in water. BIOGAS – A gas that is produced by the action of anaerobic bacteria on organic waste matter in a digester tank that can be used as a fuel. BIOSOLIDS – Biosolids are nutrient rich organic and highly treated solid materials produced by the wastewater treatment process. This high-quality product can be recycled as a soil amendment on farmland or further processed as an earth-like product for commercial and home gardens to improve and maintain fertile soil and stimulate plant growth. CAPITAL IMPROVEMENT PROGRAM (CIP) – Projects for repair, rehabilitation, and replacement of assets. Also includes treatment improvements, additional capacity, and projects for the support facilities. COLIFORM BACTERIA – A group of bacteria found in the intestines of humans and other animals, but also occasionally found elsewhere, used as indicators of sewage pollution. E. coli are the most common bacteria in wastewater. COLLECTIONS SYSTEM – In wastewater, it is the system of typically underground pipes that receive and convey sanitary wastewater or storm water. CERTIFICATE OF PARTICIPATION (COP) – A type of financing where an investor purchases a share of the lease revenues of a program rather than the bond being secured by those revenues. CONTAMINANTS OF POTENTIAL CONCERN (CPC) – Pharmaceuticals, hormones, and other organic wastewater contaminants. DILUTION TO THRESHOLD (D/T) – The dilution at which the majority of people detect the odor becomes the D/T for that air sample. GREENHOUSE GASES (GHG) – In the order of relative abundance water vapor, carbon dioxide, methane, nitrous oxide, and ozone gases that are considered the cause of global warming (“greenhouse effect”). GROUNDWATER REPLENISHMENT SYSTEM (GWRS) – A joint water reclamation project that proactively responds to Southern California’s current and future water needs. This joint project between the Orange County Water District and OCSD provides 70 million gallons per day of drinking quality water to replenish the local groundwater supply. LEVEL OF SERVICE (LOS) – Goals to support environmental and public expectations for performance. N-NITROSODIMETHYLAMINE (NDMA) – A N-nitrosamine suspected cancer-causing agent. It has been found in the GWRS process and is eliminated using hydrogen peroxide with extra ultra-violet treatment. NATIONAL BIOSOLIDS PARTNERSHIP (NBP) – An alliance of the NACWA and WEF, with advisory support from the EPA. NBP is committed to developing and advancing environmentally sound and sustainable biosolids management practices that go beyond regulatory compliance and promote public participation to enhance the credibility of local agency biosolids programs and improved communications that lead to public acceptance. PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) – A large group (over 6,000) of human-made compounds that are resistant to heat, water, and oil and used for a variety of applications including firefighting foam, stain and water-resistant clothing, cosmetics, and food packaging. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA) have been the focus of increasing regulatory scrutiny in drinking water and may result in adverse health effects including developmental effects to fetuses during pregnancy, cancer, liver damage, immunosuppression, thyroid effects, and other effects. PERFLUOROOCTANOIC ACID (PFOA) – An ingredient for several industrial applications including carpeting, upholstery, apparel, floor wax, textiles, sealants, food packaging, and cookware (Teflon). PERFLUOROOCTANESULFONIC ACID (PFOS) – A key ingredient in Scotchgard, a fabric protector made by 3M, and used in numerous stain repellents. PLUME – A visible or measurable concentration of discharge from a stationary source or fixed facility. PUBLICLY OWNED TREATMENT WORKS (POTW) – A municipal wastewater treatment plant. SANTA ANA RIVER INTERCEPTOR (SARI) LINE – A regional brine line designed to convey 30 million gallons per day of non-reclaimable wastewater from the upper Santa Ana River basin to the ocean for disposal, after treatment. SANITARY SEWER – Separate sewer systems specifically for the carrying of domestic and industrial wastewater. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) – Regional regulatory agency that develops plans and regulations designed to achieve public health standards by reducing emissions from business and industry. SECONDARY TREATMENT – Biological wastewater treatment, particularly the activated sludge process, where bacteria and other microorganisms consume dissolved nutrients in wastewater. SLUDGE – Untreated solid material created by the treatment of wastewater. TOTAL SUSPENDED SOLIDS (TSS) – The amount of solids floating and in suspension in wastewater. ORANGE COUNTY SANITATION DISTRICT GLOSSARY OF TERMS TRICKLING FILTER – A biological secondary treatment process in which bacteria and other microorganisms, growing as slime on the surface of rocks or plastic media, consume nutrients in wastewater as it trickles over them. URBAN RUNOFF – Water from city streets and domestic properties that carry pollutants into the storm drains, rivers, lakes, and oceans. WASTEWATER – Any water that enters the sanitary sewer. WATERSHED – A land area from which water drains to a particular water body. OCSD’s service area is in the Santa Ana River Watershed.