Loading...
HomeMy WebLinkAbout06-30-2025 OC SAN-SAWPA Joint Policy Committee Late Communication Memo June 26, 2025 TO: OC San / SAWPA Joint Policy Committee Orange County Sanitation District FROM: Jackie Castro Assistant Clerk of the Board RE: LATE COMMUNICATION The Assistant Clerk of the Board received a PowerPoint presentation from General Manager Rob Thompson regarding Item No. 1 after the publication of the agenda. The Presentation is attached for your reference. 1. DISCUSSION ITEMS: A. Welcome and Introductions B. Wastewater Ordinance Update (OC San/SAWPA) C. Emergency Preparedness/Resilience (SAWPA) D. Environmental Protection Agency/Waterboard Update (OC San) • Brine Line 101 RWQCB Request • PFAS RWQCB Request E. Biosolids • Supercritical Water Oxidation (OC San) • Biosolids Deep Well Injection (OC San) F. Ocean Outfall Use (OC San) • Concentration/Dilution Modeling • Risks 6/26/2025 1 SAWPA Joint Policy Committee June 30, 2025 OC San’s Current & Future State Rob Thompson General Manager 2 1 2 6/26/2025 2 Our Facilities Reclamation Plant No. 2Huntington BeachReclamation Plant No. 1Fountain ValleyOC San HeadquartersFountain Valley 3 Business Residential Industrial Private Lateral Local Sewer Manhole Local Manhole OC San Regional Trunkline Ocean Outfall To Orange County Water District Portholes Reclamation Plants Wastewater Collection System 4 3 4 6/26/2025 3 5 Allocations Based on: 530 Tons per day148 Trucks per week Fail-safe Back-up Landfill and Lime stabilization Tule Ranch – AgTech CA NV AR Kern County Los Angeles County San Diego County Yuma County OC SAN La Paz County Fail-safe Back upCompostSynagro – AZ Soils 41.9% (Feed and Seed Crops) Tule Ranch – AgTech 222 tons/day, 62 trucks/week 10.2% Compost Synagro – Liberty Compost 54 tons/day, 15 trucks/week 19.6% CompostSynagro – South Kern104 tons/day, 29 trucks/week 3.4% Compost IERCA – Inland Empire 18 tons/day, 5 trucks/week 0% (Pellets and Biochar)Anaergia – Rialto Bioenergy Facility0 tons/day, 0 trucks/week Fail-safe Back-up Landfill OCWR – Prima Deshecha 24.9% CompostSynagro – Nursery Empire132 tons/day, 37 trucks/week Biosolids Management of OC San’s biosolids are beneficially used. 100% 6 5 6 6/26/2025 4 7 •PFAS •Microplastics •Methane •Brine •Electric Haul Trucks Treatment Challenges *Image Source: City of Riverside 8 7 8 6/26/2025 5 9 What is Supercritical Water The properties of H2O change significantly above 3200 psi and 705 degrees Fahrenheit. 10 Tomorrow's Solids Solution OC San and 374Water°have partnered to build a six-ton-per day demonstration project called AirSCWO Nix6. This process uses water at a high temperature and pressure to oxidize and break down complex compound materials like PFAS. 9 10 6/26/2025 6 11 The Process… Sludge Cake to the Preprocessing Unit Preprocessed Sludge 12 The Process… Effluent/Minerals/Influent 11 12 6/26/2025 7 13 What’s Left Clean Gas Effluent Effluent Water After Processing 14 Next Steps… •Demonstrate the industrial machine at 6 tons/day •Investigate 30 ton/day unit with energy recovery. •How can we concentrate problem compounds? •What path do we take to a 100 ton/day unit? •What else might SCWO help with? •Leachate •Food waste •GAC/Ion Exchange Resin 13 14 6/26/2025 8 15 Deep Well Injection •Reduce/eliminate transport costs/carbon •Reduce treatment costs •Reduce greenhouse gas emissions •Long-term carbon sequestration •PFAS/microplastic/pharmaceuticals forever home Injection Profile Bottom of the Aquifer Injection in R2, R3 Sandstones Confining Shales Confining Shales 16 15 16 6/26/2025 9 17 •EPA Underground Injection Control (UIC) Program •CA Geologic Energy Management Division and Regional WQCB •City of Fountain Valley Well Permit •CEQA •Coastal Commission – Plant No. 2 •SCAQMD - odor scrubbers Permits •Evaluate DWI Feasibility at Plant No. 2 (late summer 2025) •EPA Meeting to introduce study (June 2025) •Key Decisions •DWI Size & location •Integration with existing biosolids management •OA & PDB/DBOM Structure •J-143 •Issue a Public Outreach Consultant Contract •Procure CEQA consultant (likely MND) •Procure Design Builder (early 2027) •EPA Permit •Well Testing Next Steps 18 17 18 6/26/2025 10 Questions? 19 For More Information Visit us at: OCSan.govFollow us: @OCSanDistrict Also on… Contact info here 20 Rob Thompson (714) 593-7110 rthompson@OCSan.gov 19 20