Loading...
HomeMy WebLinkAbout06-25-2025 Board Meeting Complete Agenda Packet SPECIAL NOTICE PUBLIC ATTENDANCE & PARTICIPATION AT PUBLIC MEETINGS OC San Board of Directors & OC San Financing Corporation Meetings Wednesday, June 25, 2025 6:00 p.m. Your participation is always welcome. OC San offers several ways in which to interact during meetings. You will find information as to these opportunities below. IN-PERSON MEETING ATTENDANCE You may attend the meeting in-person at the following location: Orange County Sanitation District Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 ONLINE MEETING PARTICIPATION You may join the meeting live via Teams on your computer or similar device or web browser by using the link below: Join the meeting now We suggest testing joining a Teams meeting on your device prior to the commencement of the meeting. For recommendations, general guidance on using Teams, and instructions on joining a Teams meeting, please click here. Please mute yourself upon entry to the meeting. Please raise your hand if you wish to speak during the public comment section of the meeting. The Clerk of the Board will call upon you by using the name you joined with. Meeting attendees are not provided the ability to make a presentation during the meeting. Please contact the Clerk of the Board at least 48 hours prior to the meeting if you wish to present any items. Additionally, camera feeds may be controlled by the meeting moderator to avoid inappropriate content. HOW TO PARTICIPATE IN THE MEETING BY TELEPHONE To join the meeting from your phone: Dial (213) 279-1455 When prompted, enter the Phone Conference ID: 590 429 103# All meeting participants may be muted during the meeting to alleviate background noise. If you are muted, please use *6 to unmute. You may also mute yourself on your device. Please raise your hand to speak by use *5, during the public comment section of the meeting. The Clerk of the Board will call upon you by using the last 4 digits of your phone number as identification. NOTE: All attendees will be disconnected from the meeting at the beginning of Closed Session. If you would like to return to the Open Session portion of the meeting, please login or dial-in to the Teams meeting again and wait in the Lobby for admittance. WATCH THE MEETING ONLINE The meeting will be available for online viewing at: https://ocsd.legistar.com/Calendar.aspx SUBMIT A COMMENT You may submit your comments and questions in writing for consideration in advance of the meeting by using the eComment feature available online at: https://ocsd.legistar.com/Calendar.aspx or sending them to OCSanClerk@ocsan.gov with the subject line “PUBLIC COMMENT ITEM # (insert the item number relevant to your comment)” or “PUBLIC COMMENT NON-AGENDA ITEM”. You may also submit comments and questions for consideration during the meeting by using the eComment feature available online at: https://ocsd.legistar.com/Calendar.aspx. The eComment feature will be available for the duration of the meeting. All written public comments will be provided to the legislative body and may be read into the record or compiled as part of the record. For any questions and/or concerns, please contact the Clerk of the Board’s office at 714-593-7433. Thank you for your interest in OC San! June 18, 2025 NOTICE OF REGULAR MEETING BOARD OF DIRECTORS ORANGE COUNTY SANITATION DISTRICT AND ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION Wednesday, June 25, 2025 – 6:00 P.M. Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 ACCESSIBILITY FOR THE GENERAL PUBLIC Your participation is always welcome. Specific information as to how to participate in this meeting is detailed on the Special Notice attached to this agenda. In general, OC San offers several ways in which to interact during this meeting: you may participate in person, join the meeting live via Teams on your computer or similar device or web browser, join the meeting live via telephone, view the meeting online, and/or submit comments for consideration before or during the meeting. The Regular Meetings of the Board of Directors of the Orange County Sanitation District and Orange County Sanitation District Financing Corporation will be held at the above location and in the manner indicated on Wednesday, June 25, 2025 at 6:00 p.m. BOARD MEETING DATES July 23, 2025 August 27, 2025 September 24, 2025 October 22, 2025 November 19, 2025 * December 17, 2025 * January 28, 2026 February 25, 2026 March 25, 2026 April 22, 2026 May 27, 2026 June 24, 2026 * Meeting will be held on the third Wednesday of the month ORANGE COUNTY SANITATION DISTRICT Effective 2/11/2025 BOARD OF DIRECTORS Complete Roster AGENCY/CITIES ACTIVE DIRECTOR ALTERNATE DIRECTOR Anaheim Carlos A. Leon Ryan Balius Brea Christine Marick Cecilia Hupp Buena Park Joyce Ahn Lamiya Hoque Cypress Scott Minikus Bonnie Peat Fountain Valley Glenn Grandis Ted Bui Fullerton Jamie Valencia Shana Charles Garden Grove Stephanie Klopfenstein Cindy Ngoc Tran Huntington Beach Pat Burns Gracey Van Der Mark Irvine Melinda Liu Kathleen Treseder La Habra Jose Medrano Rose Espinoza La Palma Debbie Baker Vikesh Patel Los Alamitos Jordan Nefulda Tanya Doby Newport Beach Erik Weigand Michelle Barto Orange Jon Dumitru John Gyllenhammer Placentia Chad Wanke Ward Smith Santa Ana Johnathan Ryan Hernandez Jessie Lopez Seal Beach Lisa Landau Ben Wong Stanton David Shawver John D. Warren Tustin Ryan Gallagher Austin Lumbard Villa Park Jordan Wu Kelly McBride Sanitary/Water Districts Costa Mesa Sanitary District Bob Ooten Art Perry Midway City Sanitary District Andrew Nguyen Tyler Diep Irvine Ranch Water District John Withers Dan Ferons Yorba Linda Water District Tom Lindsey Gene Hernandez County Areas Board of Supervisors Doug Chaffee Janet Nguyen ORANGE COUNTY SANITATION DISTRICT BOARD OF DIRECTORS& ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 - 6:00 PM Board Room Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 ACCOMMODATIONS FOR THE DISABLED: If you require any special disability related accommodations, please contact the Orange County Sanitation District (OC San) Clerk of the Board’s office at (714) 593-7433 at least 72 hours prior to the scheduled meeting. Requests must specify the nature of the disability and the type of accommodation requested. AGENDA POSTING: In accordance with the requirements of California Government Code Section 54954.2, this agenda has been posted outside OC San's Headquarters located at 18480 Bandilier Circle, Fountain Valley, California, and on the OC San’s website at www.ocsan.gov not less than 72 hours prior to the meeting date and time above. All public records relating to each agenda item, including those distributed less than 72 hours prior to the meeting to a majority of the Board of Directors, are available for public inspection with the Clerk of the Board. AGENDA DESCRIPTION: The agenda provides a brief general description of each item of business to be considered or discussed. The recommended action does not indicate what action will be taken. The Board of Directors may take any action which is deemed appropriate. MEETING RECORDING: A recording of this meeting is available within 24 hours after adjournment of the meeting at https://ocsd.legistar.com/Calendar.aspx or by contacting the Clerk of the Board. NOTICE TO DIRECTORS: To place items on the agenda for a Committee or Board Meeting, the item must be submitted to the Clerk of the Board: Kelly A. Lore, MMC, (714) 593-7433 / klore@ocsan.gov at least 14 days before the meeting. For any questions on the agenda, Board members may contact staff at: General Manager: Rob Thompson, rthompson@ocsan.gov / (714) 593-7110 Asst. General Manager: Lorenzo Tyner, ltyner@ocsan.gov / (714) 593-7550 Director of Communications: Jennifer Cabral, jcabral@ocsan.gov / (714) 593-7581 Director of Engineering: Mike Dorman, mdorman@ocsan.gov / (714) 593-7014 Director of Environmental Services: Lan Wiborg, lwiborg@ocsan.gov / (714) 593-7450 Director of Finance: Wally Ritchie, writchie@ocsan.gov / (714) 593-7570 Director of Human Resources: Laura Maravilla, lmaravilla@ocsan.gov / (714) 593-7007 Director of Operations & Maintenance: Riaz Moinuddin, rmoinuddin@ocsan.gov / (714) 593-7269 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 CALL TO ORDER Board Chairman Ryan Gallagher INVOCATION AND PLEDGE OF ALLEGIANCE Director Pat Burns, City of Huntington Beach ROLL CALL AND DECLARATION OF QUORUM Clerk of the Board PUBLIC COMMENTS: Your participation is always welcome. Specific information as to how to participate in a meeting is detailed in the Special Notice attached to this agenda. In general, OC San offers several ways in which to interact during meetings: you may participate in person, join the meeting live via Teams on your computer or similar device or web browser, join the meeting live via telephone, view the meeting online, and/or submit comments for consideration before or during the meeting. SPECIAL PRESENTATIONS: 1.2025-4338EMPLOYEE SERVICE AWARDS 20-year Service Awards David “Dave” Manning, Senior Planner/Scheduler - Division 770 Bryan Willis, Automotive/Heavy Equipment Technician - Division 260 Originator:Kelly Lore REPORTS: The Board Chairperson and the General Manager may present verbal reports on miscellaneous matters of general interest to the Directors. These reports are for information only and require no action by the Directors. CONSENT CALENDAR: Consent Calendar Items are considered to be routine and will be enacted, by the Board of Directors, after one motion, without discussion. Any items withdrawn from the Consent Calendar for separate discussion will be considered in the regular order of business. 2.2025-4337APPROVAL OF MINUTES RECOMMENDATION: Approve minutes of the Regular meeting of the Board of Directors held May 28, 2025. Originator:Kelly Lore Page 1 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 Agenda Report 05-28-2025 Board of Directors Meeting Minutes Attachments: RECEIVE AND FILE: 3.2024-3841REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF MAY 2025 RECOMMENDATION: Receive and file the following: Report of the Investment Transactions for the month of May 2025. Originator:Wally Ritchie Agenda Report Report of the Investment Transactions - May 2025 Attachments: 4.2025-4035COMMITTEE MEETING MINUTES RECOMMENDATION: Receive and file the following: A. Minutes of the Steering Committee Meeting held April 23, 2025 B. Minutes of the Operations Committee Meeting held May 7, 2025 C. Minutes of the Administration Committee Meeting held May 14, 2025 Originator:Kelly Lore Agenda Report 04-23-2025 Steering Committee Meeting Minutes 05-07-2025 Operations Committee Meeting Minutes 05-14-2025 Administration Committee Meeting Minutes Attachments: OPERATIONS COMMITTEE: 5.2025-4325ENGINEERING PROGRAM CONTRACT PERFORMANCE REPORT RECOMMENDATION: Receive and file the Engineering Program Contract Performance Report for the period ending March 31, 2025; and for the period ending December 31, 2024. Originator:Mike Dorman Agenda Report Engineering Program Contract Performance Report for the period ending March 31, 2025 Engineering Program Contract Performance Report for the period ending December 31, 2024 Attachments: Page 2 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 6.2025-4326SANTA ANA TRUNK SEWER REHABILITATION, PROJECT NO. 1-23 RECOMMENDATION: Approve an agreement with the Union Pacific Railroad Company (UPRR) for the installation and operation of a temporary, above grade, bypass pipe in the UPRR right-of-way during the construction of Santa Ana Trunk Sewer Rehabilitation, Project No. 1-23, in the amount of $373,770, in a form approved by General Counsel. Originator:Mike Dorman Agenda Report Union Pacific Railroad Company Agreement Attachments: 7.2025-4327ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS, PROJECT NO. J-98 RECOMMENDATION: A. Receive and file Bid Tabulation and Recommendation for Electrical Power Distribution System Improvements, Project No. J-98; B. Award a Construction Contract Agreement to Shimmick Construction Company, Inc., for Electrical Power Distribution System Improvements, Project No. J-98, for a total amount not to exceed $ 24,352,127; and C. Approve a contingency of $2,435,213 (10%). Originator:Mike Dorman Agenda Report J-98 Construction Contract Agreement Presentation - J-98 Contract Award Attachments: 8.2025-4328ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS, PROJECT NO. J-98 RECOMMENDATION: A. Approve a Professional Construction Services Agreement with Brown and Caldwell to provide construction support services for Electrical Power Distribution System Improvements, Project No. J-98, for a total amount not to exceed $2,667,874; and B. Approve a contingency of $266,787 (10%). Originator:Mike Dorman Page 3 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 Agenda Report J-98 PCSA Presentation - J-98 PCSA Award Attachments: ADMINISTRATION COMMITTEE: 9.2025-4342GANN APPROPRIATIONS LIMIT FOR FISCAL YEAR 2025-26 RECOMMENDATION: Adopt Resolution No. OC SAN 25-03, entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District Establishing the Annual Appropriations Limit for Fiscal Year 2025-26 for the Orange County Sanitation District in Accordance with the Provisions of Division 9 of Title 1 of the California Government Code”. Originator:Wally Ritchie Agenda Report Proposed Resolution No. OC SAN 25-03 (Gann) Attachments: 10.2025-4343FY 2025-26 USE CHARGES FOR SANTA ANA WATERSHED PROJECT AUTHORITY RECOMMENDATION: Adopt Resolution No. OC SAN 25-04, entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District Establishing Use Charges for the 2025-26 Fiscal Year Pursuant to the Wastewater Treatment and Disposal Agreement with the Santa Ana Watershed Project Authority (“SAWPA”)”. Originator:Wally Ritchie Agenda Report Proposed Resolution No. 25-04 (SAWPA) Attachments: 11.2025-4344ORANGE COUNTY WASTE AND RECYCLING WASTE DISPOSAL AGREEMENT, AMENDMENT NO. 2 RECOMMENDATION: Approve Amendment No. 2 of the OC Waste and Recycling Waste Disposal Agreement, extending the initial term of the Agreement from June 30, 2025 to June 30, 2026, for a total amount not to exceed $748,000 which includes the unit price per ton for solid waste disposal and the associated escalation costs. Originator:Lan Wiborg Agenda Report Amendment No. 2 Attachments: Page 4 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 12.2025-4345PUBLIC AFFAIRS UPDATE FOR THE MONTH OF MAY 2025 RECOMMENDATION: Receive and file the Public Affairs Update for the month of May 2025. Originator:Jennifer Cabral Agenda Report Outreach Report for May 2025 Attachments: 13.2025-4346LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF MAY 2025 RECOMMENDATION: Receive and file the Legislative Affairs Update for the month of May 2025. Originator:Jennifer Cabral Agenda Report Federal Legislative Update Federal Matrix State Legislative Update State Matrix Local Legislative Update H.R. 2269, WIPPES Act - Letter of Support SB 496 (Hurtado) - Letter of Support Cap-and-Trade Funding Request Presentation Attachments: 14.2025-4347FY 2025-26 PROPERTY - LIABILITY INSURANCE RENEWALS RECOMMENDATION: Approve the Orange County Sanitation District FY 2025-26 Property-Liability Insurance Renewals included in the FY 2025-26 Budget for the not-to-exceed amounts specified below: Property and Boiler & Machinery - Not to Exceed $3,118,944 Excess General Liability Insurance - Not to Exceed $1,429,942 Excess Workers’ Compensation Insurance - Not to Exceed $ 476,000 Earthquake Insurance - Not to Exceed $ 206,744 Cyber Liability $ 143,935 TOTAL $5,375,565 Originator:Wally Ritchie Agenda ReportAttachments: Page 5 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 STEERING COMMITTEE: 15.2025-4358FOOD WASTE TIPPING FEE RECOMMENDATION: Approve a tipping fee of $47 per wet ton of source separated organic food waste to provide to pre-processors for planning purposes. Originator:Mike Dorman Agenda ReportAttachments: 16.2025-4359GENERAL MANAGER’S FY 2024-2025 WORK PLAN YEAR-END REPORT RECOMMENDATION: Receive and file the General Manager’s FY 2024-2025 Work Plan Year-End Report. Originator:Rob Thompson Agenda Report GM's FY 2024-2025 Work Plan Year-End Report Attachments: 17.2025-4360GENERAL MANAGER’S FY 2025-2026 WORK PLAN RECOMMENDATION: Receive and file the General Manager’s FY 2025-2026 Work Plan. Originator:Rob Thompson Agenda Report GM's FY 2025-2026 Work Plan Attachments: Recess the Orange County Sanitation District Board of Directors Meeting ******************************************************************************************************** Page 6 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION The members of the Orange County Sanitation District Board of Directors are each being compensated $315.00 for the Board Meeting; there is no additional compensation for the Financing Corporation Meeting. CALL TO ORDER Board of Directors, Orange County Sanitation District Financing Corporation ROLL CALL AND DECLARATION OF QUORUM Secretary of the Financing Corporation APPROVAL OF MINUTES FC-1 2025-4219APPROVAL OF MINUTES - ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION RECOMMENDATION: Approve Minutes of the Regular meeting of the Orange County Sanitation District Financing Corporation held March 27, 2024. Originator:Kelly Lore Agenda Report 03-27-2024 Financing Corporation Meeting Minutes Attachments: NON-CONSENT: FC-2 2025-4220ANNUAL STATUS REPORT OF THE ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION RECOMMENDATION: Receive and file the Annual Status Report of the Orange County Sanitation District Financing Corporation. Originator:Wally Ritchie Agenda ReportAttachments: Adjourn, Board of Directors, Orange County Sanitation District Financing Corporation ******************************************************************************************************** Page 7 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 Reconvene, Board of Directors, Orange County Sanitation District NON-CONSENT: 18.2025-4348PROPOSED FISCAL YEAR 2025-26 BUDGET UPDATE RECOMMENDATION: Approve the proposed Operating, Capital, Debt Service, and Self-Insurance Budgets for FY 2025-26 as follows: FY 2025-26 Net Operating $ 246,365,399 Self-Insurance $ 6,745,565 Net Capital Improvement Program $ 254,276,633 Debt/COP Service $ 60,431,104 Intra-District Joint Equity Purchase/Sale (1) $ 3,500,000 Other Requirements $ 10,000,000 TOTAL $ 581,318,701 (1) Cash to/from Revenue Area 14 (RA14) in exchange for capital assets to/from Consolidated Revenue Area 15 (RA15) Originator:Wally Ritchie Agenda Report Proposed Budget Update FY2025-26 Presentation Attachments: INFORMATION ITEMS: None. AB 1234 DISCLOSURE REPORTS: This item allows Board members to provide a brief oral report regarding the disclosure of outside committees, conferences, training, seminars, etc. attended at the Agency’s expense, per Government Code §53232.3(d). • Report from Board Delegate - ISDOC • Report from Board Delegate - NWRI • Report from Board Delegate - OCCOG • Report from Board Delegate - SARFPA • Report from GWRS Steering Committee Member(s) • Other CLOSED SESSION: During the course of conducting the business set forth on this agenda as a regular meeting of the Board, the Chairperson may convene the Board in closed session to consider matters of pending real estate negotiations, pending or potential litigation, or personnel matters, pursuant to Government Code Sections 54956.8, 54956.9, 54957 or 54957.6, as noted. Page 8 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 Reports relating to (a) purchase and sale of real property; (b) matters of pending or potential litigation; (c) employment actions or negotiations with employee representatives; or which are exempt from public disclosure under the California Public Records Act, may be reviewed by the Board during a permitted closed session and are not available for public inspection. At such time the Board takes final action on any of these subjects, the minutes will reflect all required disclosures of information. CONVENE IN CLOSED SESSION. CS-1 2025-4361CONFERENCE WITH LABOR NEGOTIATORS - GOVERNMENT CODE SECTION 54957.6 RECOMMENDATION: Convene in Closed Session: Designated Representatives: General Manager Robert Thompson, Assistant General Manager Lorenzo Tyner, Director of Human Resources Laura Maravilla, and Chief Negotiator Laura Kalty. Employee Organizations: (3) International Union of Operating Engineers, Local 501; Orange County Employees Association; and the Supervisory and Professional Management Group. Unrepresented Employees: (3) Confidential Group, Manager Group, and Executive Managers Group. Agenda Report Board CS Memo re Labor Negotiation 06-25-25 Attachments: CS-2 2025-4362CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(1) RECOMMENDATION: Convene in Closed Session: Number of Cases: 1 Julia Ha v. Orange County Sanitation District, Orange County Superior Court Case No. 30-2025-01484899-CU-WT-CJC Agenda Report Board CS Memo re Existing litigation-Ha 06-25-25 Attachments: CS-3 2025-4363CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(1) RECOMMENDATION: Convene in Closed Session: Number of Cases: 1 Joe Lara v. Orange County Sanitation District, Orange County Superior Court Case No. Page 9 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 30-2025-01451615-CU-OE-CJC Agenda Report Board CS Memo re Existing Litigation-Lara 06-25-25 Attachments: CS-4 2025-4364CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(1) RECOMMENDATION: Convene in Closed Session: Number of Cases: 1 Danny Letner, Inc. dba Letner Roofing Company v. Orange County Sanitation District, et al, Orange County Superior Court Case No. 30-2025-01484794-CU-OR-CJC Agenda Report Board CS Memo re Existing Litigation-Letner 06-25-25 Attachments: CS-5 2025-4365CONFERENCE WITH REAL PROPERTY NEGOTIATORS - GOVERNMENT CODE SECTION 54956.8 RECOMMENDATION: Convene in Closed Session: Property: 10700 Spencer Street, Fountain Valley, CA - APN No.156-154-07 and 156-163-16. Agency negotiators: General Manager Rob Thompson; Assistant General Manager Lorenzo Tyner; and Director of Finance Wally Ritchie. Negotiating parties: Shabtai Itzhak Tr Ins Tr Under negotiation: Terms of payment Agenda Report Board CS Memo re Real Property 06-25-25 Attachments: RECONVENE IN REGULAR SESSION. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: Page 10 of 11 BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, June 25, 2025 BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: At this time Directors may request staff to place an item on a future agenda. ADJOURNMENT: Adjourn the Board meeting until the Regular Meeting of the Board of Directors on July 23, 2025 at 6:00 p.m. Page 11 of 11 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4337 Agenda Date:6/25/2025 Agenda Item No:2. FROM:Robert Thompson, General Manager Originator: Kelly A. Lore, Clerk of the Board SUBJECT: APPROVAL OF MINUTES GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve minutes of the Regular meeting of the Board of Directors held May 28, 2025. BACKGROUND In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting will be provided to the Directors for subsequent approval at the following meeting. RELEVANT STANDARDS ·Resolution No. OC SAN 24-09 ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·May 28, 2025 Board of Directors meeting minutes Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ ORANGE COUNTY SANITATION DISTRICT MINUTES BOARD OF DIRECTORS MAY 28, 2025 Board Room Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 BOARD OF DIRECTORS Minutes May 28, 2025 CALL TO ORDER A regular meeting of the Board of Directors of the Orange County Sanitation District was called to order by Board Chairman Ryan Gallagher on Wednesday, May 28, 2025 at 6:02 p.m. in the Orange County Sanitation District Headquarters. Director Stephanie Klopfenstein delivered the invocation and led the Pledge of Allegiance. ROLL CALL AND DECLARATION OF QUORUM The Clerk of the Board declared a quorum present as follows: PRESENT:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu ABSENT:Jamie Valencia STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; Marc Brown; Jackie Castro; Sam Choi; Daisy Covarrubias; Raul Cuellar; Don Cutler; Thys DeVries; Martin Dix; Justin Fenton; Dickie Fernandez; John Frattali; David Haug; Ryan McMullin; Tom Meregillano; Rob Michaels; Jonathon Powell; Aldwin Ramirez; Valerie Ratto; Vianey Sorto-Gaona; Thomas Vu; Kevin Work; and Ruth Zintzun were present in the Board Room. OTHERS PRESENT: Scott Smith, General Counsel; Ryan Baron, Associate Counsel; James Gilpin, Associate Counsel; Laura Drottz Kalty, Special Counsel, Liebert Cassidy Whitmore; and Alternate Director Ben Wong, City of Seal Beach were present in the Board Room. PUBLIC COMMENTS: None. The Clerk of the Board announced that late communication had been received and distributed to the Board of Directors and to the public in regard to Item No. 9. SPECIAL PRESENTATIONS: 1.EMPLOYEE SERVICE AWARDS 2025-4256 Originator: Kelly Lore Environmental Supervisor Jonathan Powell presented a 20-year service award to Senior Scientist Ryan McMullin; and IT Manager Rob Michaels presented a 25-year service award to Principal Staff Analyst Marc Brown. Page 1 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 Chair Gallagher also recognized Source Control Inspector I Darrin Canen and Principal Accountant Cristina Stanford, who could not be in attendance, for their 25-years of service. 20-year Service Award Ryan McMullin, Senior Scientist - Division 630 25-year Service Awards Marc Brown, Principal Staff Analyst - Division 250 Darrin Canen, Source Control Inspector I - Division 620 Cristina Stanford, Principal Accountant - Division 220 REPORTS: Chair Gallagher announced that the Directors and Alternate Directors would be receiving talking points regarding OC San activities for their use reporting out to their agencies and community groups. Chair Gallagher reminded the Directors that OC San would be recognizing four former employees and a former board member during the Honor Wall Ceremony on June 25 at 3:30 p.m. in front of the Headquarters Building. General Manager Rob Thompson reported on the status of the Strategic Plan noting the completion of the policy review process and utilizing the Directors feedback to update the plan which is scheduled to be presented to the Board in September. Mr. Thompson also reported that he had recently presented the Core Values, the Levels of Service will be presented in June, and the Risk Register in July. In addition, the Cybersecurity and AI policy paper will be presented in July based on feedback from the Board. Mr. Thompson reported on his recent participation in the following: NACWA’s Region 9 Utility Executive Dialogue; SCCWRP Commissioning Meeting; and hosted tours for San Diego Public Utilities, and Director Carlos Leon and his staff. Mr. Thompson announced that for the 31st consecutive year, OC San earned the Certificate of Achievement for Excellence in Financial Reporting from the Government Finance Officers Association (GFOA); and for the 12th consecutive year, OC San received the Platinum Peak Performance Award from the National Association of Clean Water Agencies (NACWA) which recognizes member agencies for achieving 100 percent water discharge permit compliance over a consecutive five-year period. Mr. Thompson reported that OC San was recently included in the publication of the OC Register Water Insert which highlighted our role in protecting the environment along with other local agencies. Page 2 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 PUBLIC HEARING: 2.AB 2561 COMPLIANCE - ANNUAL REPORT ON EMPLOYEE VACANCIES, RECRUITMENT AND RETENTION 2025-4295 Originator: Laura Maravilla Chair Gallagher opened the public hearing at 6:23 p.m. Director of Human Resources Laura Maravilla provided a brief report on the Employee Vacancies, Recruitment and Retention; Clerk of the Board Kelly Lore stated there were no written comment(s) in objection; and with no other comment or objection, Chair Gallagher closed the public hearing at 6:28 p.m. MOVED, SECONDED, AND DULY CARRIED TO: A. Conduct a Public Hearing to present the status of vacancies, recruitment and retention: 1.Open Public Hearing 2.Receive Staff report and recommendations 3.Report of written communications by the Clerk of the Board 4.Public Comment 5.Close Public Hearing 6.Discussion by Board B. Receive and file the Annual Report on Employee Vacancies, Recruitment and Retention. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None ELECTIONS: 3.NOMINATIONS FOR CHAIRPERSON AND VICE CHAIRPERSON OF THE ORANGE COUNTY SANITATION DISTRICT BOARD OF DIRECTORS 2025-4143 Originator: Kelly Lore General Counsel Scott Smith provided instructions and facilitated the nomination process. Page 3 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 Mr. Smith opened nominations for Chairperson of the Board of Directors. One nomination was received for the office of Chairperson (Ryan Gallagher). A motion, second, and unanimous approval to close nominations was received. With no further nominations, Ryan Gallagher was deemed elected as Chairman of the Board of Directors for the 2025/26 term. Mr. Smith opened nominations for Vice-Chairperson of the Board of Directors. One nomination was received for the office of Vice-Chairperson (Jon Dumitru). A motion, second, and unanimous approval to close nominations was received. With no further nominations, Jon Dumitru was deemed elected as Vice-Chairman of the Board of Directors for the 2025/26 term. A. Open nominations for Chairperson of the Board of Directors. (Election to be held at the regular June Board of Directors meeting unless only one candidate is nominated.) B. Open nominations for Vice Chairperson of the Board of Directors. (Election to be held at the regular June Board of Directors meeting unless only one candidate is nominated.) CONSENT CALENDAR: 4.APPROVAL OF MINUTES 2025-4255 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Approve minutes of the Special meeting of the Board of Directors held April 16, 2025; and the Regular meeting of the Board of Directors held April 23, 2025. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 5.PUBLIC MASS NOTIFICATION SYSTEM MEMORANDUM OF UNDERSTANDING WITH THE COUNTY OF ORANGE 2025-4297 Originator: Laura Maravilla Page 4 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 MOVED, SECONDED, AND DULY CARRIED TO: Approve the Memorandum of Understanding with the County of Orange for the use of the countywide public mass notification system. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None RECEIVE AND FILE: 6.REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF APRIL 2025 2024-3835 Originator: Wally Ritchie WITHOUT OBJECTION ACTION TAKEN TO RECEIVE AND FILE THE FOLLOWING: Report of the Investment Transactions for the month of April 2025. 7.COMMITTEE MEETING MINUTES 2025-4034 Originator: Kelly Lore WITHOUT OBJECTION ACTION TAKEN TO RECEIVE AND FILE THE FOLLOWING: A. Minutes of the Steering Committee Meeting held March 26, 2025 B. Minutes of the Operations Committee Special Meeting held April 2, 2025 C. Minutes of the Administration Committee Special Meeting held April 9, 2025 OPERATIONS COMMITTEE: 8.PURCHASE AND INSTALLATION OF CENTRIFUGE ISOLATORS AT PLANT NO. 1 2025-4291 Originator: Riaz Moinuddin MOVED, SECONDED, AND DULY CARRIED TO: Page 5 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 A. Approve a Sole Source General Services Contract to GEA Mechanical Equipment US, Inc. for the purchase and installation of isolator units on six (6) Thickening and Dewatering centrifuges, for a total amount not to exceed $696,726; and B. Approve a contingency of $69,673 (10%). AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 9.SAFETY SHOWER AND EYEWASH STATIONS INSPECTIONS AND TESTING, SPECIFICATION NO. S-2025-669BD 2025-4292 Originator: Riaz Moinuddin MOVED, SECONDED, AND DULY CARRIED TO: A. Receive and file Zeco, Inc. protest statement dated April 2, 2025; B. Receive and file Orange County Sanitation District’s Protest Response letter dated April 16, 2025; C. Approve a General Services Contract to Haws Corporation for Safety Shower and Eyewash Stations Inspections and Testing, Specification No. S-2025-669BD, for a total amount not to exceed $224,594; and D.Approve a contingency of $33,689 (15%). AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None Page 6 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 10.BUILDING 6, CONTROL CENTER, AND LABORATORY ELEVATOR REHABILITATION AT PLANT NO. 1, PROJECT NO. FE24-06 2025-4293 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Purchase Order Contract to TK Elevator (TKE) for Building 6, Control Center, and Laboratory Elevator Rehabilitation at Plant No. 1, Project No. FE24-06, using Sourcewell Cooperative Contract No. 080420-TKE, for a total amount not to exceed $633,000; and B. Approve a contingency of $126,600 (20%). AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None ADMINISTRATION COMMITTEE: 11.CONSOLIDATED FINANCIAL REPORT FOR THE THIRD QUARTER ENDED MARCH 31, 2025 2025-4299 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Orange County Sanitation District Third Quarter Financial Report for the period ended March 31, 2025. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None Page 7 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 12.GENERAL MANAGER APPROVED PURCHASES AND ADDITIONS TO THE PRE-APPROVED OEM SOLE SOURCE LIST 2025-4300 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: A. Receive and file Orange County Sanitation District (OC San) purchases made under the General Manager’s authority for the period of January 1, 2025 to March 31, 2025; and B. Approve the following additions to the pre-approved Original Equipment Manufacturers (OEM) Sole Source List: ·MANITOWOC CRANE - Crane and Heavy Equipment Parts and Service ·MODEC USA INC - Portable Valve Actuators and Associated Equipment ·PITBULL INDUSTRIAL PUMPS - Pumps and Parts ·SPAANS BABCOCK - Parts and Equipment AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 13.MIGRATE PRIMAVERA P6 PROFESSIONAL TO PRIMAVERA P6 ENTERPRISE PROJECT PORTFOLIO MANAGEMENT 2025-4301 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Page 8 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 A. Approve a Purchase Order Contract to Mythics VIII, LLC for the purchase of Primavera P6 Enterprise Project Portfolio Management software licenses, utilizing the cooperative OMNIA Contract No. 180233-002 for a total amount not to exceed $112,728; B. Approve a Purchase Order Contract to Mythics VIII, LLC for Phase II Primavera Migration Services utilizing the cooperative OMNIA Contract No. 180233-002, for a total amount not to exceed $121,599; C. Approve a Purchase Order Contract to Carahsoft Technology Corp., for Phase III Primavera P6 Enterprise Project Portfolio Management system integrations utilizing Naspo ValuePoint Master Contract AR2472-CAR001-101, for a total amount not to exceed $101,271; and D. Approve a 10% contingency for each contract. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 14.INTERNAL AUDIT UPDATE 2025-4302 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Orange County Sanitation District Enterprise Risk Assessment Report. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None Page 9 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 15.PURCHASE ORDER FOR CALIFORNIA RECREATION COMPANY MARINA SLIP RENTAL AGREEMENT 2025-4303 Originator: Lan Wiborg MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a purchase order to California Recreation Company (CRC) Marinas for the rental of an end tie boat slip in Newport Beach Harbor, in an amount not to exceed $159,794 for the period of July 1, 2025, through June 30, 2026, with nine (9) optional one-year renewals; and B. Approve an annual increase not to exceed 10% of the previous year’s amount. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 16.OCEAN ACIDIFICATION AND HYPOXIA MINI-MOORING 2025-4304 Originator: Lan Wiborg MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Sole Source Service Contract with The Regents of the University of California on behalf of its San Diego campus’ Scripps Institution of Oceanography to build and maintain an ocean acidification and hypoxia (OAH) mini-mooring and to provide field and data support, in an amount not to exceed $290,000 for the period July 1, 2025, to June 30, 2026; B. Approve three (3) optional one-year renewals to maintain and calibrate the mini-mooring sensors as well as provide field and data support, in an amount not to exceed $130,000 for each renewal; and C. Approve a 10% contingency per year. Page 10 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 17.TRIPLE QUADRUPOLE INDUCTIVELY COUPLED PLASMA MASS SPECTROMETER 2025-4305 Originator: Lan Wiborg MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Purchase Order to Avantor (VWR) for the purchase of a Triple Quadrupole Inductively Coupled Plasma Mass Spectrometer (TQ-ICP/MS) System using NASPO Master Agreement No. MA2024005 for a total amount not to exceed $328,000; and B. Approve a contingency of $16,400 (5%). AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 18.PUBLIC AFFAIRS UPDATE FOR THE MONTH OF APRIL 2025 2025-4306 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Public Affairs Update for the month of April 2025. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu Page 11 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 19.ELECTRONIC RECORDING MEMORANDUM OF UNDERSTANDING COUNTY OF ORANGE CLERK-RECORDER’S OFFICE 2025-4307 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: A. Approve the Memorandum of Understanding with the counties of Los Angeles, Orange, Riverside, and San Bernardino, for the use of the Statewide Electronic Courier Universal Recording Environment (SECURE) Government to Government (G2G) Portal for a term of five (5) years beginning June 15, 2025 through June 15, 2030; and B. Authorize the Clerk of the Board, or designee, to transmit/record any and all required Orange County Sanitation District real property documents in an electronic format with the County of Orange Clerk-Recorder’s Office. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 20.IBM TIVOLI MAXIMO ANNUAL SUBSCRIPTION AND SUPPORT, SPECIFICATION NO. S-2025-681BD 2025-4308 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a Purchase Order Contract to Lantrasoft, Inc. to purchase IBM Tivoli Maximo application point licenses, Specification No. S-2025-681BD, for a total amount not to exceed $290,000; with four (4) one-year renewal options; and B. Approve an annual contingency in the amount of $43,500 (15%). Page 12 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 21.LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF APRIL 2025 2025-4309 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Legislative Affairs Update for the month of April 2025. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None 22.ADOPT ORANGE COUNTY SANITATION DISTRICT’S DEBT POLICY 2025-4310 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Adopt Resolution No. OC SAN 25-02 entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District Adopting the Orange County Sanitation District’s Debt Policy and Repealing Resolution No. OC SAN 23-22”. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Glenn Grandis, Johnathan Ryan Hernandez, Stephanie Klopfenstein, Lisa Landau, Carlos Leon, Tom Lindsey, Melinda Liu, Christine Marick, Jose Medrano, Scott Minikus, Jordan Nefulda, Andrew Nguyen, Robert Ooten, David Shawver, Chad Wanke, Erik Weigand, John Withers and Jordan Wu NOES:None ABSENT:Jamie Valencia ABSTENTIONS:None Page 13 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 STEERING COMMITTEE: None. NON-CONSENT: None. INFORMATION ITEMS: None. AB 1234 DISCLOSURE REPORTS: Directors Pat Burns, Andrew Nguyen, Bob Ooten, and Dave Shawver provided a report on their recent attendance at various Regional Board Meetings. CLOSED SESSION: CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS 54957.6, 54956.9(d)(1), 54957(a)(1), & 54956.8. The Board convened in closed session at 6:37 p.m. Confidential minutes of the Closed Sessions have been prepared in accordance with the above Government Code Sections and are maintained by the Clerk of the Board in the Official Book of Confidential Minutes of Board and Committee Closed Session meetings. CS-1 CONFERENCE WITH LABOR NEGOTIATORS - GOVERNMENT CODE SECTION 54957.6 2025-4317 CONVENED IN CLOSED SESSION: Designated Representatives: General Manager Robert Thompson, Assistant General Manager Lorenzo Tyner, Director of Human Resources Laura Maravilla, and Chief Negotiator Laura Kalty. Employee Organizations: (3) International Union of Operating Engineers, Local 501; Orange County Employees Association; and the Supervisory and Professional Management Group. CS-2 CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(d)(1) 2025-4318 CONVENED IN CLOSED SESSION: Page 14 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 Number of Cases: 1 PCL Construction Inc. v. Orange County Sanitation District et al., Orange County Superior Court Case No. 30-2025-01472899-CU-BC-WJC. CS-3 THREAT TO PUBLIC SERVICES OR FACILITIES - GOVERNMENT CODE SECTION 54957(a)(1) 2025-4319 CONVENED IN CLOSED SESSION: Conference with Risk Management regarding security. CS-4 CONFERENCE WITH REAL PROPERTY NEGOTIATORS - GOVERNMENT CODE SECTION 54956.8 2025-4312 CONVENED IN CLOSED SESSION: Property: 10700 Spencer Street, Fountain Valley, CA - APN No.156-154-07 and 156-163-16. Agency negotiators: General Manager Rob Thompson; Assistant General Manager Lorenzo Tyner; and Director of Finance Wally Ritchie. Negotiating parties: Shabtai Itzhak Tr Ins Tr Under negotiation: Price and terms of payment RECONVENED IN REGULAR SESSION. The Board reconvened in regular session at 8:40 p.m. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: General Counsel Scott Smith reported that on Closed Session Item No. 2 the Board of Directors voted unanimously to confirm the understanding that General Counsel should answer and defend the lawsuit that is listed. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. Page 15 of 16 BOARD OF DIRECTORS Minutes May 28, 2025 ADJOURNMENT: At 8:41 p.m., Chair Gallagher adjourned the meeting until the next Regular Meeting of the Board of Directors to be held on Wednesday, June 25, 2025 at 6:00 p.m. Submitted by: __________________ Kelly A. Lore, MMC Clerk of the Board Page 16 of 16 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2024-3841 Agenda Date:6/25/2025 Agenda Item No:3. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF MAY 2025 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the following: Report of the Investment Transactions for the month of May 2025. BACKGROUND The CA Government Code requires that a monthly report of investment transactions be provided to the legislative body.Attached is the monthly report of investment transactions for the month ended May 31, 2025. RELEVANT STANDARDS ·CA Government Code Section 53607 PRIOR COMMITTEE/BOARD ACTIONS N/A FINANCIAL CONSIDERATIONS N/A ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Report of the Investment Transactions - May 2025 Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Account Beginning Cash Principal Cash: -21,723,371.24 Income Cash: 21,723,371.24 Total Cash: - 01-May- 25 01-May-25 31846V567 FGZXX I 310 INTEREST EARNED ON FIRST AM GOVT OB FD CL Z UNIT ON 0.0000 SHARES DUE 4/30/2025 INTEREST FROM 4/1/25 TO 4/30/25 -----6,471.49 ---SEI Post Date 01-May-25 Total ---6,471.49 ---SEI 02-May- 25 02-May-25 36166NAG8 I 300 PAID ACCRUED INTEREST ON PURCHASE OF GE CAP FUNDING L P 3.450% 5/15/25 ------16,404.27 ---SEI 02-May- 25 02-May-25 64952WDQ 3 I 300 PAID ACCRUED INTEREST ON PURCHASE OF NEW YORK LIFE MTN 0.950% 6/24/25 ------810.67 ---SEI 02-May- 25 02-May-25 64952WDQ 3 I 300 PAID ACCRUED INTEREST ON PURCHASE OF NEW YORK LIFE MTN 0.950% 6/24/25 ------506.67 ---SEI 02-May- 25 02-May-25 3130AWSY7 I 310 INTEREST EARNED ON F H L B DEB 0.00001% 5/02/25 $1 PV ON 1210000.0000 SHARES DUE 5/2/2025 -----13,381.76 ---SEI 02-May- 25 02-May-25 64953BBB3 NYL3025 I 310 INTEREST EARNED ON NEW YORK LIFE 3.00595% 5/02/25 $1 PV ON 3512000.0000 SHARES DUE 5/2/2025 -----43,026.35 ---SEI 02-May- 25 01-May- 25 02-May-25 36166NAG8 P 10 PURCHASED PAR VALUE OF GE CAP FUNDING L P 3.450% 5/15/25 /MORGAN STANLEY & CO. LLC/1,025,000 PAR VALUE AT 98.94 % 1,025,000.0000 98.940 0 ----1,014,135.00 1,014,135.00 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 1 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 02-May- 25 01-May- 25 02-May-25 64952WDQ 3 P 10 PURCHASED PAR VALUE OF NEW YORK LIFE MTN 0.950% 6/24/25 /J.P. MORGAN SECURITIES LLC/240,000 PAR VALUE AT 99.49 % 240,000.0000 99.490 0 ----238,776.00 238,776.00 --SEI 02-May- 25 01-May- 25 02-May-25 64952WDQ 3 P 10 PURCHASED PAR VALUE OF NEW YORK LIFE MTN 0.950% 6/24/25 /GOLDMAN SACHS & CO. LLC/150,000 PAR VALUE AT 99.491 % 150,000.0000 99.491 0 ----149,236.50 149,236.50 --SEI 02-May- 25 02-May- 25 02-May-25 3130AWSY7 P 20 MATURED PAR VALUE OF F H L B DEB 0.00001% 5/02/25 1,210,000 PAR VALUE AT 100 % - 1,210,000.0000 100.00 00 ---1,210,000.00 -1,210,415.39 -415.39 -SEI 02-May- 25 02-May- 25 02-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,308,602.3800 -----3,308,602.38 3,308,602.38 --SEI 02-May- 25 02-May- 25 02-May-25 64953BBB3 NYL3025 P 20 MATURED PAR VALUE OF NEW YORK LIFE 3.00595% 5/02/25 3,512,000 PAR VALUE AT 100 % - 3,512,000.0000 100.00 00 ---3,512,000.00 -3,512,140.48 -140.48 -SEI 02-May- 25 02-May- 25 02-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 56,408.1100 -----56,408.11 56,408.11 --SEI Post Date 02-May-25 Total ----6,471.49 44,602.12 -555.87 -SEI 05-May- 25 05-May-25 3133EPRW7 FFC5425AC I 310 INTEREST EARNED ON F F C B DEB 4.44956% 8/04/25 $1 PV ON 124000.0000 SHARES DUE 5/4/2025 -----1,379.36 ---SEI 05-May- 25 05-May-25 594918BJ2 I 310 INTEREST EARNED ON MICROSOFT CORP 3.125% 11/03/25 $1 PV ON 2100000.0000 SHARES DUE 5/3/2025 -----32,812.50 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 2 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 05-May- 25 05-May-25 3130B5RZ3 I 310 INTEREST EARNED ON FEDERAL HOME LOAN 0.00001% 11/03/25 $1 PV ON 1000000.0000 SHARES DUE 5/3/2025 -----3,861.39 ---SEI 05-May- 25 05-May-25 3130B5Q68 I 310 INTEREST EARNED ON FEDERAL HOME LOAN 0.00001% 11/04/25 $1 PV ON 2000000.0000 SHARES DUE 5/4/2025 -----7,236.67 ---SEI 05-May- 25 05-May- 25 05-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 34,191.8600 -----34,191.86 34,191.86 --SEI 05-May- 25 05-May- 25 05-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 3,659,932.9400 ----3,659,932.94 -3,659,932.94 --SEI 05-May- 25 05-May- 25 05-May-25 14912DSE0 P 10 PURCHASED PAR VALUE OF CATERPILLAR FINL SVCS C P 5/14/25 /WELLS FARGO SECURITIES, LLC/3,675,000 PAR VALUE AT 99.892 % 3,675,000.0000 99.892 0 ----3,671,031.00 3,671,031.00 --SEI Post Date 05-May-25 Total ----45,289.92 --SEI 06-May- 25 06-May-25 14912DS67 I 310 INTEREST EARNED ON CATERPLR FIN SRV CO C P 5/06/25 $1 PV ON 1000000.0000 SHARES DUE 5/6/2025 1,000,000 PAR VALUE AT 100 % -----1,446.67 ---SEI 06-May- 25 06-May-25 14912DS67 I 310 INTEREST EARNED ON CATERPLR FIN SRV CO C P 5/06/25 $1 PV ON 750000.0000 SHARES DUE 5/6/2025 750,000 PAR VALUE AT 100 % -----630.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 3 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 06-May- 25 06-May-25 14912DS67 I 310 INTEREST EARNED ON CATERPLR FIN SRV CO C P 5/06/25 $1 PV ON 170000.0000 SHARES DUE 5/6/2025 170,000 PAR VALUE AT 100 % -----142.80 ---SEI 06-May- 25 06-May-25 3130B4DA6 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L B DEB 0.00001% 5/22/25 ------16,720.53 ---SEI 06-May- 25 06-May- 25 06-May-25 14912DS67 P 20 MATURED PAR VALUE OF CATERPLR FIN SRV CO C P 5/06/25 170,000 PAR VALUE AT 100 % -170,000.0000 100.00 00 ---169,857.20 -169,857.20 --SEI 06-May- 25 06-May- 25 06-May-25 14912DS67 P 20 MATURED PAR VALUE OF CATERPLR FIN SRV CO C P 5/06/25 1,000,000 PAR VALUE AT 100 % - 1,000,000.0000 100.00 00 ---998,553.33 -998,553.33 --SEI 06-May- 25 06-May- 25 06-May-25 14912DS67 P 20 MATURED PAR VALUE OF CATERPLR FIN SRV CO C P 5/06/25 750,000 PAR VALUE AT 100 % -750,000.0000 100.00 00 ---749,370.00 -749,370.00 --SEI 06-May- 25 06-May- 25 06-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 1,920,000.0000 -----1,920,000.00 1,920,000.00 --SEI 06-May- 25 06-May- 25 06-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 1,916,688.1900 ----1,916,688.19 -1,916,688.19 --SEI 06-May- 25 06-May- 25 06-May-25 3130B4DA6 P 10 PURCHASED PAR VALUE OF F H L B DEB 0.00001% 5/22/25 /BARCLAYS CAPITAL INC. FIXED IN/1,900,000 PAR VALUE AT 99.99829789 % 1,900,000.0000 99.998 3 ----1,899,967.66 1,899,967.66 --SEI Post Date 06-May-25 Total -----14,501.06 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 4 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 09-May- 25 09-May-25 3130AXR59 I 310 INTEREST EARNED ON F H L B DEB 4.480% 5/09/25 $1 PV ON 3325000.0000 SHARES DUE 5/9/2025 -----36,738.48 ---SEI 09-May- 25 09-May-25 45866FAT1 I 300 PAID ACCRUED INTEREST ON PURCHASE OF INTERCONTINENTAL 3.650% 5/23/25 ------11,916.03 ---SEI 09-May- 25 09-May- 25 09-May-25 3130AXR59 P 20 MATURED PAR VALUE OF F H L B DEB 4.480% 5/09/25 3,325,000 PAR VALUE AT 100 % - 3,325,000.0000 100.00 00 ---3,325,000.00 -3,326,152.84 -1,152.84 -SEI 09-May- 25 09-May- 25 09-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,325,000.0000 -----3,325,000.00 3,325,000.00 --SEI 09-May- 25 09-May- 25 09-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 3,301,604.6200 ----3,301,604.62 -3,301,604.62 --SEI 09-May- 25 09-May- 25 09-May-25 16677JSW7 P 10 PURCHASED PAR VALUE OF CHEVRON CORP DISC COML C P 5/30/25 /BOFA SECURITIES, INC./FXD INC/1,000,000 PAR VALUE AT 99.749167 % 1,000,000.0000 99.749 2 ----997,491.67 997,491.67 --SEI 09-May- 25 09-May- 25 09-May-25 912797NN3 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 5/29/25 /BARCLAYS CAPITAL INC. FIXED IN/1,625,000 PAR VALUE AT 99.76555569 % 1,625,000.0000 99.765 6 ----1,621,190.28 1,621,190.28 --SEI 09-May- 25 09-May- 25 09-May-25 45866FAT1 P 10 PURCHASED PAR VALUE OF INTERCONTINENTAL 3.650% 5/23/25 /J.P. MORGAN SECURITIES LLC/708,000 PAR VALUE AT 99.964 % 708,000.0000 99.964 0 ----707,745.12 707,745.12 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 5 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Post Date 09-May-25 Total ----23,669.61 -1,152.84 -SEI 12-May- 25 12-May-25 6698M4SC7 I 310 INTEREST EARNED ON NOVARTIS FIN CORP DISC C P 5/12/25 $1 PV ON 750000.0000 SHARES DUE 5/12/2025 750,000 PAR VALUE AT 100 % -----1,170.00 ---SEI 12-May- 25 12-May-25 64952WDQ 3 I 300 PAID ACCRUED INTEREST ON PURCHASE OF NEW YORK LIFE MTN 0.950% 6/24/25 ------1,893.67 ---SEI 12-May- 25 12-May-25 91159HHZ6 I 310 INTEREST EARNED ON US BANCORP MTNS MTN 1.450% 5/12/25 $1 PV ON 4574000.0000 SHARES DUE 5/12/2025 INTEREST ON 5/12/25 MATURITY -----33,161.50 ---SEI 12-May- 25 09-May- 25 12-May-25 64952WDQ 3 P 10 PURCHASED PAR VALUE OF NEW YORK LIFE MTN 0.950% 6/24/25 /USBCUS31 US BANCORP INVEST US/520,000 PAR VALUE AT 99.568 % 520,000.0000 99.568 0 ----517,753.60 517,753.60 --SEI 12-May- 25 12-May- 25 12-May-25 91159HHZ6 P 20 MATURED PAR VALUE OF US BANCORP MTNS MTN 1.450% 5/12/25 2,000,000 PAR VALUE AT 100 % - 2,000,000.0000 100.00 00 ---2,000,000.00 -1,997,880.00 2,120.00 -SEI 12-May- 25 12-May- 25 12-May-25 91159HHZ6 P 20 MATURED PAR VALUE OF US BANCORP MTNS MTN 1.450% 5/12/25 2,574,000 PAR VALUE AT 100 % - 2,574,000.0000 100.00 00 ---2,574,000.00 -2,555,796.08 18,203.92 -SEI 12-May- 25 12-May- 25 12-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 4,804,352.7300 -----4,804,352.73 4,804,352.73 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 6 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 12-May- 25 12-May- 25 12-May-25 6698M4SC7 P 20 MATURED PAR VALUE OF NOVARTIS FIN CORP DISC C P 5/12/25 750,000 PAR VALUE AT 100 % -750,000.0000 100.00 00 ---748,830.00 -748,830.00 --SEI 12-May- 25 12-May- 25 12-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 4,856,230.0000 ----4,856,230.00 -4,856,230.00 --SEI 12-May- 25 12-May- 25 12-May-25 14912DSW0 P 10 PURCHASED PAR VALUE OF CATERPILLAR FINL SVCS C P 5/30/25 /WELLS FARGO SECURITIES, LLC/XOTC 4,900,000 PAR VALUE AT 99.7835 % 4,900,000.0000 99.783 5 ----4,889,391.50 4,889,391.50 --SEI Post Date 12-May-25 Total ----52,761.75 20,323.92 -SEI 14-May- 25 14-May-25 3133ELQ49 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F F C B DEB 0.700% 6/30/25 ------4,293.95 ---SEI 14-May- 25 14-May-25 3135GA6P1 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F N M A 0.500% 6/24/25 ------3,888.89 ---SEI 14-May- 25 14-May-25 14912DSE0 I 310 INTEREST EARNED ON CATERPILLAR FINL SVCS C P 5/14/25 $1 PV ON 3675000.0000 SHARES DUE 5/14/2025 3,675,000 PAR VALUE AT 100 % -----3,969.00 ---SEI 14-May- 25 14-May-25 00287YAQ2 I 310 INTEREST EARNED ON ABBVIE INC 3.600% 5/14/25 $1 PV ON 3553000.0000 SHARES DUE 5/14/2025 -----63,954.00 ---SEI 14-May- 25 13-May- 25 14-May-25 3135GA6P1 P 10 PURCHASED PAR VALUE OF F N M A 0.500% 6/24/25 /MIZUHO SECURITIES USA INC./2,000,000 PAR VALUE AT 99.552 % 2,000,000.0000 99.552 0 ----1,991,040.00 1,991,040.00 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 7 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 14-May- 25 13-May- 25 14-May-25 3133ELQ49 P 10 PURCHASED PAR VALUE OF F F C B DEB 0.700% 6/30/25 /STONEX FINANCIAL INC./1,648,000 PAR VALUE AT 99.533 % 1,648,000.0000 99.533 0 ----1,640,303.84 1,640,303.84 --SEI 14-May- 25 14-May- 25 14-May-25 00287YAQ2 P 20 MATURED PAR VALUE OF ABBVIE INC 3.600% 5/14/25 3,553,000 PAR VALUE AT 100 % - 3,553,000.0000 100.00 00 ---3,553,000.00 -3,540,594.33 12,405.67 -SEI 14-May- 25 14-May- 25 14-May-25 14912DSE0 P 20 MATURED PAR VALUE OF CATERPILLAR FINL SVCS C P 5/14/25 3,675,000 PAR VALUE AT 100 % - 3,675,000.0000 100.00 00 ---3,671,031.00 -3,671,031.00 --SEI 14-May- 25 14-May- 25 14-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,652,427.3200 -----3,652,427.32 3,652,427.32 --SEI 14-May- 25 14-May- 25 14-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 3,593,072.0000 ----3,593,072.00 -3,593,072.00 --SEI 14-May- 25 14-May- 25 14-May-25 14912DSW0 P 10 PURCHASED PAR VALUE OF CATERPILLAR FINL SVCS C P 5/30/25 /BOFA SECURITIES, INC./FXD INC/XOTC 3,600,000 PAR VALUE AT 99.80755556 % 3,600,000.0000 99.807 6 ----3,593,072.00 3,593,072.00 --SEI Post Date 14-May-25 Total ----72,145.83 12,405.67 -SEI 15-May- 25 15-May-25 880591EW8 I 310 INTEREST EARNED ON T V A 0.750% 5/15/25 $1 PV ON 1500000.0000 SHARES DUE 5/15/2025 -----5,625.00 ---SEI 15-May- 25 15-May-25 36166NAG8 I 310 INTEREST EARNED ON GE CAP FUNDING L P 3.450% 5/15/25 $1 PV ON 1025000.0000 SHARES DUE 5/15/2025 -----17,681.25 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 8 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-May- 25 15-May-25 912797NP8 I 310 INTEREST EARNED ON U S TREASURY BILL 6/05/25 $1 PV ON 1000000.0000 SHARES DUE 5/15/2025 1,000,000 PAR VALUE AT 99.753221 % -----2,680.82 ---SEI 15-May- 25 14-May- 25 15-May-25 14912DSW0 P 10 PURCHASED PAR VALUE OF CATERPILLAR FINL SVCS C P 5/30/25 /WELLS FARGO SECURITIES, LLC/XOTC 2,400,000 PAR VALUE AT 99.81958333 % 2,400,000.0000 99.819 6 ----2,395,670.00 2,395,670.00 --SEI 15-May- 25 14-May- 25 15-May-25 59157TTR4 P 10 PURCHASED PAR VALUE OF METLIFE SHORT TERM FDG C P 6/25/25 /BOFA SECURITIES, INC./FXD INC/1,200,000 PAR VALUE AT 99.508 % 1,200,000.0000 99.508 0 ----1,194,096.00 1,194,096.00 --SEI 15-May- 25 15-May- 25 15-May-25 880591EW8 P 20 MATURED PAR VALUE OF T V A 0.750% 5/15/25 1,500,000 PAR VALUE AT 100 % - 1,500,000.0000 100.00 00 ---1,500,000.00 -1,495,410.00 4,590.00 -SEI 15-May- 25 15-May- 25 15-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -67,686.4800 ----67,686.48 -67,686.48 --SEI 15-May- 25 15-May- 25 15-May-25 36166NAG8 P 20 MATURED PAR VALUE OF GE CAP FUNDING L P 3.450% 5/15/25 1,025,000 PAR VALUE AT 100 % - 1,025,000.0000 100.00 00 ---1,025,000.00 -1,014,135.00 10,865.00 -SEI 15-May- 25 15-May- 25 15-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 23,758.9400 -----23,758.94 23,758.94 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 9 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-May- 25 15-May- 25 15-May-25 912797NP8 P 20 SOLD PAR VALUE OF U S TREASURY BILL 6/05/25 /BARCLAYS CAPITAL INC. FIXED IN/BTEC 1,000,000 PAR VALUE AT 99.753221 % - 1,000,000.0000 99.753 2 ---994,851.39 -994,851.39 --SEI Post Date 15-May-25 Total ----41,442.07 15,455.00 -SEI 19-May- 25 19-May-25 3133ELC28 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F F C B DEB 0.730% 5/27/25 ------4,813.13 ---SEI 19-May- 25 19-May-25 3134GVB31 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F H L M C M T N 0.750% 5/28/25 ------3,562.50 ---SEI 19-May- 25 19-May-25 46590DSK7 I 310 INTEREST EARNED ON J P MORGAN SECS LLC C P 5/19/25 $1 PV ON 1000000.0000 SHARES DUE 5/19/2025 1,000,000 PAR VALUE AT 100 % -----18,700.00 ---SEI 19-May- 25 19-May-25 19121ASK8 I 310 INTEREST EARNED ON COCA COLA COMPANY C P 5/19/25 $1 PV ON 7600000.0000 SHARES DUE 5/19/2025 7,600,000 PAR VALUE AT 100 % -----25,713.33 ---SEI 19-May- 25 16-May- 25 19-May-25 3133ELC28 P 10 PURCHASED PAR VALUE OF F F C B DEB 0.730% 5/27/25 /WELLS FARGO SECURITIES, LLC/1,380,000 PAR VALUE AT 99.916 % 1,380,000.0000 99.916 0 ----1,378,840.80 1,378,840.80 --SEI 19-May- 25 16-May- 25 19-May-25 912797NN3 P 10 PURCHASED PAR VALUE OF U S TREASURY BILL 5/29/25 /BMO-CHICAGO BRANCH/6,225,000 PAR VALUE AT 99.88216675 % 6,225,000.0000 99.882 2 ----6,217,664.88 6,217,664.88 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 10 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 19-May- 25 16-May- 25 19-May-25 3134GVB31 P 10 PURCHASED PAR VALUE OF F H L M C M T N 0.750% 5/28/25 /MIZUHO SECURITIES USA INC./1,000,000 PAR VALUE AT 99.9092 % 1,000,000.0000 99.909 2 ----999,092.00 999,092.00 --SEI 19-May- 25 19-May- 25 19-May-25 46590DSK7 P 20 MATURED PAR VALUE OF J P MORGAN SECS LLC C P 5/19/25 1,000,000 PAR VALUE AT 100 % - 1,000,000.0000 100.00 00 ---981,300.00 -981,300.00 --SEI 19-May- 25 19-May- 25 19-May-25 19121ASK8 P 20 MATURED PAR VALUE OF COCA COLA COMPANY C P 5/19/25 7,600,000 PAR VALUE AT 100 % - 7,600,000.0000 100.00 00 ---7,574,286.67 -7,574,286.67 --SEI 19-May- 25 19-May- 25 19-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -3,973.3100 ----3,973.31 -3,973.31 --SEI Post Date 19-May-25 Total ----36,037.70 --SEI 20-May- 25 20-May-25 3130B53B2 I 310 INTEREST EARNED ON F H L B DEB 4.320% 8/20/25 $1 PV ON 2000000.0000 SHARES DUE 5/20/2025 -----21,670.56 ---SEI 20-May- 25 20-May-25 45905U6L3 IBM3125 I 310 INTEREST EARNED ON INTL BK M T N 3.126% 11/20/25 $1 PV ON 750000.0000 SHARES DUE 5/20/2025 -----11,722.50 ---SEI 20-May- 25 20-May- 25 20-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 33,393.0600 -----33,393.06 33,393.06 --SEI Post Date 20-May-25 Total ----33,393.06 --SEI 21-May- 25 21-May-25 45685QSM2 I 310 INTEREST EARNED ON ING US FDG LLC DISC C P 5/21/25 $1 PV ON 250000.0000 SHARES DUE 5/21/2025 250,000 PAR VALUE AT 100 % -----5,001.87 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 11 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 21-May- 25 21-May-25 3130AWWV 8 I 310 INTEREST EARNED ON F H L B DEB 0.00001% 8/21/25 $1 PV ON 490000.0000 SHARES DUE 5/21/2025 -----5,436.75 ---SEI 21-May- 25 21-May- 25 21-May-25 45685QSM2 P 20 MATURED PAR VALUE OF ING US FDG LLC DISC C P 5/21/25 250,000 PAR VALUE AT 100 % -250,000.0000 100.00 00 ---244,998.13 -244,998.13 --SEI 21-May- 25 21-May- 25 21-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 250,000.0000 -----250,000.00 250,000.00 --SEI 21-May- 25 21-May- 25 21-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 5,436.7500 -----5,436.75 5,436.75 --SEI Post Date 21-May-25 Total ----10,438.62 --SEI 22-May- 25 22-May-25 3130B4DA6 I 310 INTEREST EARNED ON F H L B DEB 0.00001% 5/22/25 $1 PV ON 2900000.0000 SHARES DUE 5/22/2025 -----31,061.42 ---SEI 22-May- 25 22-May- 25 22-May-25 3130B4DA6 P 20 MATURED PAR VALUE OF F H L B DEB 0.00001% 5/22/25 2,900,000 PAR VALUE AT 100 % - 2,900,000.0000 100.00 00 ---2,900,000.00 -2,899,946.26 53.74 -SEI 22-May- 25 22-May- 25 22-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 2,900,000.0000 -----2,900,000.00 2,900,000.00 --SEI 22-May- 25 22-May- 25 22-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 3,165,823.9100 ----3,165,823.91 -3,165,823.91 --SEI 22-May- 25 22-May- 25 22-May-25 91058TSW7 P 10 PURCHASED PAR VALUE OF UNITEDHEALTH GROUP INC C P 5/30/25 /WELLS FARGO SECURITIES, LLC/3,200,000 PAR VALUE AT 99.90266656 % 3,200,000.0000 99.902 7 ----3,196,885.33 3,196,885.33 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 12 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Post Date 22-May-25 Total ----31,115.16 53.74 -SEI 23-May- 25 23-May-25 45866FAT1 I 310 INTEREST EARNED ON INTERCONTINENTAL 3.650% 5/23/25 $1 PV ON 2579000.0000 SHARES DUE 5/23/2025 -----47,066.75 ---SEI 23-May- 25 23-May-25 3130ANKD1 I 310 INTEREST EARNED ON F H L B DEB 0.650% 5/23/25 $1 PV ON 1000000.0000 SHARES DUE 5/23/2025 -----3,250.00 ---SEI 23-May- 25 23-May- 25 23-May-25 45866FAT1 P 20 MATURED PAR VALUE OF INTERCONTINENTAL 3.650% 5/23/25 2,579,000 PAR VALUE AT 100 % - 2,579,000.0000 100.00 00 ---2,579,000.00 -2,567,672.06 11,327.94 -SEI 23-May- 25 23-May- 25 23-May-25 3130ANKD1 P 20 MATURED PAR VALUE OF F H L B DEB 0.650% 5/23/25 1,000,000 PAR VALUE AT 100 % - 1,000,000.0000 100.00 00 ---1,000,000.00 -993,379.00 6,621.00 -SEI 23-May- 25 23-May- 25 23-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,629,316.7500 -----3,629,316.75 3,629,316.75 --SEI 23-May- 25 23-May- 25 23-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 3,646,891.4200 ----3,646,891.42 -3,646,891.42 --SEI 23-May- 25 23-May- 25 23-May-25 91058TSW7 P 10 PURCHASED PAR VALUE OF UNITEDHEALTH GROUP INC C P 5/30/25 /MIZUHO SECURITIES USA INC./3,650,000 PAR VALUE AT 99.91483342 % 3,650,000.0000 99.914 8 ----3,646,891.42 3,646,891.42 --SEI Post Date 23-May-25 Total ----68,265.69 17,948.94 -SEI 27-May- 25 27-May-25 3133ELC28 I 310 INTEREST EARNED ON F F C B DEB 0.730% 5/27/25 $1 PV ON 1380000.0000 SHARES DUE 5/27/2025 -----5,037.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 13 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 27-May- 25 27-May-25 3133EPRC1 FFC1825 I 310 INTEREST EARNED ON F F C B DEB 4.42689% 5/27/25 $1 PV ON 910000.0000 SHARES DUE 5/27/2025 -----10,071.17 ---SEI 27-May- 25 27-May-25 3130B5CE6 I 310 INTEREST EARNED ON F H L B DEB 4.320% 8/25/25 $1 PV ON 1000000.0000 SHARES DUE 5/25/2025 -----10,463.33 ---SEI 27-May- 25 27-May- 25 27-May-25 3133ELC28 P 20 MATURED PAR VALUE OF F F C B DEB 0.730% 5/27/25 1,380,000 PAR VALUE AT 100 % - 1,380,000.0000 100.00 00 ---1,380,000.00 -1,378,840.80 1,159.20 -SEI 27-May- 25 27-May- 25 27-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 2,305,108.1700 -----2,305,108.17 2,305,108.17 --SEI 27-May- 25 27-May- 25 27-May-25 3133EPRC1 FFC1825 P 20 MATURED PAR VALUE OF F F C B DEB 4.42689% 5/27/25 910,000 PAR VALUE AT 100 % -910,000.0000 100.00 00 ---910,000.00 -910,341.61 -341.61 -SEI 27-May- 25 27-May- 25 27-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 2,289,266.4200 ----2,289,266.42 -2,289,266.42 --SEI 27-May- 25 27-May- 25 27-May-25 313385GD2 P 10 PURCHASED PAR VALUE OF F H L B DISC NTS 5/28/25 /WELLS FARGO SECURITIES, LLC/XOTC 2,300,000 PAR VALUE AT 99.98825 % 2,300,000.0000 99.988 3 ----2,299,729.75 2,299,729.75 --SEI Post Date 27-May-25 Total ----26,389.09 817.59 -SEI 28-May- 25 28-May-25 313385GD2 I 310 INTEREST EARNED ON F H L B DISC NTS 5/28/25 $1 PV ON 2300000.0000 SHARES DUE 5/28/2025 2,300,000 PAR VALUE AT 100 % -----270.25 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 14 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 28-May- 25 28-May-25 717081EX7 I 310 INTEREST EARNED ON PFIZER INC SR GLBL 0.800% 5/28/25 $1 PV ON 2000000.0000 SHARES DUE 5/28/2025 -----8,000.00 ---SEI 28-May- 25 28-May-25 3134GVB31 I 310 INTEREST EARNED ON F H L M C M T N 0.750% 5/28/25 $1 PV ON 1000000.0000 SHARES DUE 5/28/2025 -----3,750.00 ---SEI 28-May- 25 28-May- 25 28-May-25 3134GVB31 P 20 MATURED PAR VALUE OF F H L M C M T N 0.750% 5/28/25 1,000,000 PAR VALUE AT 100 % - 1,000,000.0000 100.00 00 ---1,000,000.00 -999,092.00 908.00 -SEI 28-May- 25 28-May- 25 28-May-25 717081EX7 P 20 MATURED PAR VALUE OF PFIZER INC SR GLBL 0.800% 5/28/25 2,000,000 PAR VALUE AT 100 % - 2,000,000.0000 100.00 00 ---2,000,000.00 -1,958,525.25 41,474.75 -SEI 28-May- 25 28-May- 25 28-May-25 313385GD2 P 20 MATURED PAR VALUE OF F H L B DISC NTS 5/28/25 2,300,000 PAR VALUE AT 100 % - 2,300,000.0000 100.00 00 ---2,299,729.75 -2,299,729.75 --SEI 28-May- 25 28-May- 25 28-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 5,308,000.0000 -----5,308,000.00 5,308,000.00 --SEI 28-May- 25 28-May- 25 28-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 5,278,998.5000 ----5,278,998.50 -5,278,998.50 --SEI 28-May- 25 28-May- 25 28-May-25 53245PTQ1 P 10 PURCHASED PAR VALUE OF LILLY ELI CO DISC COML C P 6/24/25 /CITIGROUP GLOBAL MARKETS INC./5,300,000 PAR VALUE AT 99.6745 % 5,300,000.0000 99.674 5 ----5,282,748.50 5,282,748.50 --SEI Post Date 28-May-25 Total ----54,403.00 42,382.75 -SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 15 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 29-May- 25 29-May-25 3135G04Z3 I 300 PAID ACCRUED INTEREST ON PURCHASE OF F N M A 0.500% 6/17/25 ------4,835.25 ---SEI 29-May- 25 29-May-25 912797NN3 I 310 INTEREST EARNED ON U S TREASURY BILL 5/29/25 $1 PV ON 1625000.0000 SHARES DUE 5/29/2025 1,625,000 PAR VALUE AT 100 % -----3,809.72 ---SEI 29-May- 25 29-May-25 912797NN3 I 310 INTEREST EARNED ON U S TREASURY BILL 5/29/25 $1 PV ON 6225000.0000 SHARES DUE 5/29/2025 6,225,000 PAR VALUE AT 100 % -----7,335.12 ---SEI 29-May- 25 29-May-25 3130B5DQ8 I 310 INTEREST EARNED ON F H L B DEB 0.00001% 8/29/25 $1 PV ON 1000000.0000 SHARES DUE 5/29/2025 -----10,936.67 ---SEI 29-May- 25 29-May-25 3130B5DP0 I 310 INTEREST EARNED ON F H L B DEB 4.320% 8/29/25 $1 PV ON 2000000.0000 SHARES DUE 5/29/2025 -----20,906.11 ---SEI 29-May- 25 28-May- 25 29-May-25 3135G04Z3 P 10 PURCHASED PAR VALUE OF F N M A 0.500% 6/17/25 /CITIGROUP GLOBAL MARKETS INC./2,149,000 PAR VALUE AT 99.79958306 % 2,149,000.0000 99.799 6 ----2,144,693.04 2,144,693.04 --SEI 29-May- 25 29-May- 25 29-May-25 912797NN3 P 20 MATURED PAR VALUE OF U S TREASURY BILL 5/29/25 6,225,000 PAR VALUE AT 100 % - 6,225,000.0000 100.00 00 ---6,217,664.88 -6,217,664.88 --SEI 29-May- 25 29-May- 25 29-May-25 912797NN3 P 20 MATURED PAR VALUE OF U S TREASURY BILL 5/29/25 1,625,000 PAR VALUE AT 100 % - 1,625,000.0000 100.00 00 ---1,621,190.28 -1,621,190.28 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 16 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 29-May- 25 29-May- 25 29-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 5,700,471.7100 -----5,700,471.71 5,700,471.71 --SEI 29-May- 25 29-May- 25 29-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 5,655,907.5800 ----5,655,907.58 -5,655,907.58 --SEI 29-May- 25 29-May- 25 29-May-25 19121ATR2 P 10 PURCHASED PAR VALUE OF COCA COLA CO DISC COML C P 6/25/25 /GOLDMAN SACHS & CO. LLC/3,700,000 PAR VALUE AT 99.67525 % 3,700,000.0000 99.675 3 ----3,687,984.25 3,687,984.25 --SEI 29-May- 25 29-May- 25 29-May-25 880590GF5 P 10 PURCHASED PAR VALUE OF T V A DISC NTS 5/30/25 /MORGAN STANLEY & CO. LLC/XOTC 2,000,000 PAR VALUE AT 99.9883055 % 2,000,000.0000 99.988 3 ----1,999,766.11 1,999,766.11 --SEI Post Date 29-May-25 Total ----38,152.37 --SEI 30-May- 25 30-May-25 91058TSW7 I 310 INTEREST EARNED ON UNITEDHEALTH GROUP INC C P 5/30/25 $1 PV ON 3200000.0000 SHARES DUE 5/30/2025 3,200,000 PAR VALUE AT 100 % -----3,114.67 ---SEI 30-May- 25 30-May-25 91058TSW7 I 310 INTEREST EARNED ON UNITEDHEALTH GROUP INC C P 5/30/25 $1 PV ON 3650000.0000 SHARES DUE 5/30/2025 3,650,000 PAR VALUE AT 100 % -----3,108.58 ---SEI 30-May- 25 30-May-25 16677JSW7 I 310 INTEREST EARNED ON CHEVRON CORP DISC COML C P 5/30/25 $1 PV ON 1250000.0000 SHARES DUE 5/30/2025 1,250,000 PAR VALUE AT 100 % -----3,656.25 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 17 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-May- 25 30-May-25 14912DSW0 I 310 INTEREST EARNED ON CATERPILLAR FINL SVCS C P 5/30/25 $1 PV ON 10900000.0000 SHARES DUE 5/30/2025 10,900,000 PAR VALUE AT 100 % -----21,866.50 ---SEI 30-May- 25 30-May-25 59157TSW4 I 310 INTEREST EARNED ON METLIFE SHORT TERM FDG C P 5/30/25 $1 PV ON 6680000.0000 SHARES DUE 5/30/2025 6,680,000 PAR VALUE AT 100 % -----109,564.99 ---SEI 30-May- 25 30-May-25 880590GF5 I 310 INTEREST EARNED ON T V A DISC NTS 5/30/25 $1 PV ON 2000000.0000 SHARES DUE 5/30/2025 2,000,000 PAR VALUE AT 100 % -----233.89 ---SEI 30-May- 25 30-May-25 P 210 CASH DISBURSEMENT PAID TO ORANGE COUNTY SANITATION DISTRICT OUTGOING DOMESTIC WIRE TRANSFER FROM LIQUID OPERATING PORTFOLIO ------30,000,000.00 ---SEI 30-May- 25 30-May- 25 30-May-25 59157TSW4 P 20 MATURED PAR VALUE OF METLIFE SHORT TERM FDG C P 5/30/25 6,680,000 PAR VALUE AT 100 % - 6,680,000.0000 100.00 00 ---6,570,435.01 -6,570,435.01 --SEI 30-May- 25 30-May- 25 30-May-25 880590GF5 P 20 MATURED PAR VALUE OF T V A DISC NTS 5/30/25 2,000,000 PAR VALUE AT 100 % - 2,000,000.0000 100.00 00 ---1,999,766.11 -1,999,766.11 --SEI 30-May- 25 30-May- 25 30-May-25 14912DSW0 P 20 MATURED PAR VALUE OF CATERPILLAR FINL SVCS C P 5/30/25 10,900,000 PAR VALUE AT 100 % - 10,900,000.000 0 100.00 00 ---10,878,133.50 - 10,878,133.50 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 18 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046600 OCSD LIQUID OPERATING PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-May- 25 30-May- 25 30-May-25 16677JSW7 P 20 MATURED PAR VALUE OF CHEVRON CORP DISC COML C P 5/30/25 1,250,000 PAR VALUE AT 100 % - 1,250,000.0000 100.00 00 ---1,246,343.75 -1,246,343.75 --SEI 30-May- 25 30-May- 25 30-May-25 91058TSW7 P 20 MATURED PAR VALUE OF UNITEDHEALTH GROUP INC C P 5/30/25 3,200,000 PAR VALUE AT 100 % - 3,200,000.0000 100.00 00 ---3,196,885.33 -3,196,885.33 --SEI 30-May- 25 30-May- 25 30-May-25 459053GF5 P 20 MATURED PAR VALUE OF INTL BK DISC NTS 5/30/25 2,300,000 PAR VALUE AT 100 % - 2,300,000.0000 100.00 00 ---2,300,000.00 -2,265,597.11 34,402.89 -SEI 30-May- 25 30-May- 25 30-May-25 91058TSW7 P 20 MATURED PAR VALUE OF UNITEDHEALTH GROUP INC C P 5/30/25 3,650,000 PAR VALUE AT 100 % - 3,650,000.0000 100.00 00 ---3,646,891.42 -3,646,891.42 --SEI 30-May- 25 30-May- 25 30-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 29,980,000.000 0 -----29,980,000.00 29,980,000.00 --SEI 30-May- 25 30-May- 25 30-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 30,000,000.000 0 ----30,000,000.00 - 30,000,000.00 --SEI Post Date 30-May-25 Total ----- 29,824,052.23 34,402.89 -SEI Account 6745046600 Total ----- 29,260,447.30 142,081.79 -SEI Account Ending Cash Principal Cash: -22,320,842.15 Income Cash: 22,320,842.15 Total Cash: - TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 19 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Account Beginning Cash Principal Cash: -97,929,592.52 Income Cash: 97,929,592.52 Total Cash: - 01-May- 25 01-May-25 91282CGJ4 I 300 PAID ACCRUED INTEREST ON PURCHASE OF U S TREASURY NT 3.500% 1/31/30 ------47,206.49 ---SEI 01-May- 25 01-May-25 91282CCF6 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 0.750% 5/31/26 -----15,972.53 ---SEI 01-May- 25 01-May-25 20030NCH2 I 310 INTEREST EARNED ON COMCAST CORP 3.550% 5/01/28 $1 PV ON 5000000.0000 SHARES DUE 5/1/2025 -----88,750.00 ---SEI 01-May- 25 01-May-25 31846V567 FGZXX I 310 INTEREST EARNED ON FIRST AM GOVT OB FD CL Z UNIT ON 0.0000 SHARES DUE 4/30/2025 INTEREST FROM 4/1/25 TO 4/30/25 -----8,901.96 ---SEI 01-May- 25 30-Apr-25 01-May-25 91282CGJ4 P 10 PURCHASED PAR VALUE OF U S TREASURY NT 3.500% 1/31/30 /CITIGROUP GLOBAL MARKETS INC./5,425,000 PAR VALUE AT 99.07846009 % 5,425,000.0000 99.078 5 ----5,375,006.46 5,375,006.46 --SEI 01-May- 25 30-Apr-25 01-May-25 91282CCF6 P 20 SOLD PAR VALUE OF U S TREASURY NT 0.750% 5/31/26 /MORGAN STANLEY & CO. LLC/5,100,000 PAR VALUE AT 96.72232118 % - 5,100,000.0000 96.722 3 ---4,932,838.38 -5,061,750.00 -- 128,911. 62 SEI 01-May- 25 01-May- 25 01-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -384,652.0400 ----384,652.04 -384,652.04 --SEI Post Date 01-May-25 Total ---8,901.96 -71,395.58 -- 128,911. 62 SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 20 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 02-May- 25 02-May- 25 02-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 8,901.9600 -----8,901.96 8,901.96 --SEI Post Date 02-May-25 Total ----8,901.96 8,901.96 --SEI 07-May- 25 07-May-25 40139LBD4 I 301 RECEIVED ACCRUED INTEREST ON SALE OF GUARDIAN LIFE MTN 1.250% 5/13/26 -----19,635.42 ---SEI 07-May- 25 06-May- 25 07-May-25 40139LBD4 P 20 SOLD PAR VALUE OF GUARDIAN LIFE MTN 1.250% 5/13/26 /BOFA SECURITIES, INC./FXD INC/3,250,000 PAR VALUE AT 96.959 % - 3,250,000.0000 96.959 0 ---3,151,167.50 -3,124,290.00 -26,877.5 0 SEI 07-May- 25 07-May- 25 07-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,170,802.9200 -----3,170,802.92 3,170,802.92 --SEI Post Date 07-May-25 Total ----46,512.92 -26,877.5 0 SEI 08-May- 25 08-May-25 912828Z94 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 1.500% 2/15/30 -----16,988.95 ---SEI 08-May- 25 07-May- 25 08-May-25 31358DDG6 P 10 PURCHASED PAR VALUE OF F N M A STRIP 1/15/30 /WELLS FARGO SECURITIES, LLC/5,000,000 PAR VALUE AT 82.882 % 5,000,000.0000 82.882 0 ----4,144,100.00 4,144,100.00 --SEI 08-May- 25 07-May- 25 08-May-25 912828Z94 P 20 SOLD PAR VALUE OF U S TREASURY NT 1.500% 2/15/30 /J.P. MORGAN SECURITIES LLC/5,000,000 PAR VALUE AT 89.7262276 % - 5,000,000.0000 89.726 2 ---4,486,311.38 -4,437,516.75 48,794.63 -SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 21 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 08-May- 25 08-May- 25 08-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 359,200.3300 -----359,200.33 359,200.33 --SEI Post Date 08-May-25 Total ----65,783.58 48,794.63 -SEI 14-May- 25 14-May-25 61744YAP3 I 300 PAID ACCRUED INTEREST ON PURCHASE OF MORGAN STANLEY MTN 3.772% 1/24/29 ------37,458.06 ---SEI 14-May- 25 14-May-25 91282CCF6 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 0.750% 5/31/26 -----3,059.75 ---SEI 14-May- 25 14-May-25 91282CDG3 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 1.125% 10/31/26 -----213.99 ---SEI 14-May- 25 14-May-25 91282CCF6 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 0.750% 5/31/26 -----5,099.59 ---SEI 14-May- 25 05-May- 25 14-May-25 23338VAW6 P 10 PURCHASED PAR VALUE OF DTE ELEC CO 4.250% 5/14/27 /WELLS FARGO SECURITIES, LLC/865,000 PAR VALUE AT 99.918 % 865,000.0000 99.918 0 ----864,290.70 864,290.70 --SEI 14-May- 25 06-May- 25 14-May-25 23338VAW6 P 10 PURCHASED PAR VALUE OF DTE ELEC CO 4.250% 5/14/27 /RBC CAPITAL MARKETS, LLC/3,069,000 PAR VALUE AT 100.174 % 3,069,000.0000 100.17 40 ----3,074,340.06 3,074,340.06 --SEI 14-May- 25 06-May- 25 14-May-25 23338VAW6 P 10 PURCHASED PAR VALUE OF DTE ELEC CO 4.250% 5/14/27 /BOFMCAT2 BANK OF MONTREAL/1,022,000 PAR VALUE AT 100.17 % 1,022,000.0000 100.17 00 ----1,023,737.40 1,023,737.40 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 22 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 14-May- 25 13-May- 25 14-May-25 61744YAP3 P 10 PURCHASED PAR VALUE OF MORGAN STANLEY MTN 3.772% 1/24/29 /J.P. MORGAN SECURITIES LLC/3,250,000 PAR VALUE AT 97.552 % 3,250,000.0000 97.552 0 ----3,170,440.00 3,170,440.00 --SEI 14-May- 25 13-May- 25 14-May-25 91282CCF6 P 20 SOLD PAR VALUE OF U S TREASURY NT 0.750% 5/31/26 /WELLS FARGO SECURITIES, LLC/900,000 PAR VALUE AT 96.56997778 % -900,000.0000 96.570 0 ---869,129.80 -893,250.00 -- 24,120.2 0 SEI 14-May- 25 13-May- 25 14-May-25 91282CCF6 P 20 SOLD PAR VALUE OF U S TREASURY NT 0.750% 5/31/26 /MORGAN STANLEY & CO. LLC/1,500,000 PAR VALUE AT 96.573884 % - 1,500,000.0000 96.573 9 ---1,448,608.26 -1,488,750.00 -- 40,141.7 4 SEI 14-May- 25 13-May- 25 14-May-25 91282CDG3 P 20 SOLD PAR VALUE OF U S TREASURY NT 1.125% 10/31/26 /WELLS FARGO SECURITIES, LLC/500,000 PAR VALUE AT 95.851228 % -500,000.0000 95.851 2 ---479,256.14 -497,597.66 -- 18,341.5 2 SEI 14-May- 25 14-May- 25 14-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 3,614,771.2200 ----3,614,771.22 -3,614,771.22 --SEI 14-May- 25 14-May- 25 14-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 215,315.1500 -----215,315.15 215,315.15 --SEI Post Date 14-May-25 Total ----1,965,442.62 1,853,754.43 -- 82,603.4 6 SEI 15-May- 25 14-May-25 459058JL8 I 301 RECEIVED ACCRUED INTEREST ON SALE OF INTL BK M T N 0.500% 10/28/25 -----444.44 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 23 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-May- 25 15-May-25 02582JJV3 I 310 INTEREST EARNED ON AMERICAN EXPRESS 3.750% 8/16/27 $1 PV ON 6250.0000 SHARES DUE 5/15/2025 $0.00313/PV ON 2,000,000.00 PV DUE 5/15/25 -----6,250.00 ---SEI 15-May- 25 15-May-25 02582JJT8 I 310 INTEREST EARNED ON AMERICAN EXPRESS 3.390% 5/17/27 $1 PV ON 18701.5000 SHARES DUE 5/15/2025 $0.00283/PV ON 6,620,000.00 PV DUE 5/15/25 -----18,701.50 ---SEI 15-May- 25 15-May-25 02582JKM1 AE44529 I 310 INTEREST EARNED ON AMERICAN EXP 4.560% 12/17/29 $1 PV ON 40416.8000 SHARES DUE 5/15/2025 $0.00380/PV ON 10,636,000.00 PV DUE 5/15/25 -----40,416.80 ---SEI 15-May- 25 15-May-25 3133TCE95 FHL3032 I 310 INTEREST EARNED ON F H L M C MLTCL MT 4.598% 8/15/32 $1 PV ON 5.6200 SHARES DUE 5/15/2025 $0.00383/PV ON 1,467.95 PV DUE 5/15/25 -----5.62 ---SEI 15-May- 25 15-May-25 14043KAK1 I 310 INTEREST EARNED ON CAPITAL ONE PRIME 4.760% 8/15/28 $1 PV ON 20785.3400 SHARES DUE 5/15/2025 $0.00397/PV ON 5,240,000.00 PV DUE 5/15/25 -----20,785.34 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 24 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-May- 25 15-May-25 161571HV9 I 310 INTEREST EARNED ON CHASE ISSUE TR 4.600% 1/16/29 $1 PV ON 30820.0000 SHARES DUE 5/15/2025 $0.00383/PV ON 8,040,000.00 PV DUE 5/15/25 -----30,820.00 ---SEI 15-May- 25 15-May-25 34528QHV9 I 310 INTEREST EARNED ON FORD CR FLP MASTER 0.00001% 5/15/28 $1 PV ON 36900.0000 SHARES DUE 5/15/2025 $0.00410/PV ON 9,000,000.00 PV DUE 5/15/25 -----36,900.00 ---SEI 15-May- 25 15-May-25 43815BAC4 HAR1826 I 310 INTEREST EARNED ON HONDA AUTO REC OWN 1.880% 5/15/26 $1 PV ON 863.9000 SHARES DUE 5/15/2025 $0.00157/PV ON 551,428.68 PV DUE 5/15/25 -----863.90 ---SEI 15-May- 25 15-May-25 345282AD9 I 310 INTEREST EARNED ON FORD CREDIT AT 4.940% 6/15/28 $1 PV ON 18887.8700 SHARES DUE 5/15/2025 $0.00393/PV ON 4,802,000.00 PV DUE 5/15/25 -----18,887.87 ---SEI 15-May- 25 15-May-25 361886DK7 I 310 INTEREST EARNED ON GMF FLOORPL OWNE 4.680% 11/15/28 $1 PV ON 30069.0000 SHARES DUE 5/15/2025 $0.00390/PV ON 7,710,000.00 PV DUE 5/15/25 -----30,069.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 25 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-May- 25 15-May-25 43816DAC9 I 310 INTEREST EARNED ON HONDA AUTO 4.330% 3/15/29 $1 PV ON 7119.2400 SHARES DUE 5/15/2025 $0.00361/PV ON 1,973,000.00 PV DUE 5/15/25 -----7,119.24 ---SEI 15-May- 25 15-May-25 448984AD6 I 310 INTEREST EARNED ON HYUNDAI AUTO LEASE 4.620% 4/17/28 $1 PV ON 19250.0000 SHARES DUE 5/15/2025 $0.00385/PV ON 5,000,000.00 PV DUE 5/15/25 -----19,250.00 ---SEI 15-May- 25 15-May-25 92887TAC5 I 310 INTEREST EARNED ON VOLVO FINANCIAL 4.460% 5/15/29 $1 PV ON 6318.3300 SHARES DUE 5/15/2025 $0.00372/PV ON 1,700,000.00 PV DUE 5/15/25 -----6,318.33 ---SEI 15-May- 25 15-May-25 47800DAD6 I 310 INTEREST EARNED ON JOHN DEERE OWNER TR 4.830% 9/17/29 $1 PV ON 10737.1500 SHARES DUE 5/15/2025 $0.00353/PV ON 3,046,000.00 PV DUE 5/15/25 -----10,737.15 ---SEI 15-May- 25 15-May-25 47800BAC2 JDO5027 I 310 INTEREST EARNED ON JOHN DEERE OWNER 5.090% 6/15/27 $1 PV ON 9486.4500 SHARES DUE 5/15/2025 $0.00424/PV ON 2,236,490.40 PV DUE 5/15/25 -----9,486.45 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 26 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-May- 25 15-May-25 58773DAD6 I 310 INTEREST EARNED ON MERCEDES BENZ 4.780% 12/17/29 $1 PV ON 18960.6700 SHARES DUE 5/15/2025 $0.00398/PV ON 4,760,000.00 PV DUE 5/15/25 -----18,960.67 ---SEI 15-May- 25 15-May-25 47800AAC4 JDO6827 I 310 INTEREST EARNED ON JOHN DEERE OWNR TR 3.740% 2/16/27 $1 PV ON 3913.6700 SHARES DUE 5/15/2025 $0.00312/PV ON 1,255,724.04 PV DUE 5/15/25 -----3,913.67 ---SEI 15-May- 25 15-May-25 31348SWZ3 786064F I 310 INTEREST EARNED ON F H L M C #786064 6.262% 1/01/28 $1 PV ON 1.2900 SHARES DUE 5/15/2025 MARCH FHLMC DUE 5/15/25 -----1.29 ---SEI 15-May- 25 15-May-25 38151LAG5 I 300 PAID ACCRUED INTEREST ON PURCHASE OF GOLDMAN SACHS BK 5.414% 5/21/27 ------196,257.50 ---SEI 15-May- 25 15-May-25 927804GH1 I 310 INTEREST EARNED ON VIRGINIA ELEC PWR CO 3.750% 5/15/27 $1 PV ON 5735000.0000 SHARES DUE 5/15/2025 -----107,531.25 ---SEI 15-May- 25 15-May-25 91324PEC2 I 310 INTEREST EARNED ON UNITEDHEALTH 1.150% 5/15/26 $1 PV ON 4000000.0000 SHARES DUE 5/15/2025 -----23,000.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 27 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-May- 25 15-May-25 12674BAB1 CE44328 I 310 INTEREST EARNED ON CNH EQUIPMENT 4.300% 8/15/28 $1 PV ON 14526.5200 SHARES DUE 5/15/2025 $0.00358/PV ON 4,053,913.00 PV DUE 5/15/25 -----14,526.52 ---SEI 15-May- 25 15-May-25 44935CAD3 I 310 INTEREST EARNED ON HYUNDAI AUTO RECV TR 4.790% 10/15/29 $1 PV ON 15231.6000 SHARES DUE 5/15/2025 $0.00360/PV ON 4,231,000.00 PV DUE 5/15/25 -----15,231.60 ---SEI 15-May- 25 15-May-25 91282CDG3 I 301 RECEIVED ACCRUED INTEREST ON SALE OF U S TREASURY NT 1.125% 10/31/26 -----458.56 ---SEI 15-May- 25 13-May- 25 14-May-25 459058JL8 P 20 SOLD PAR VALUE OF INTL BK M T N 0.500% 10/28/25 /BOFMCAT2 BANK OF MONTREAL/2,000,000 PAR VALUE AT 98.249909 % - 2,000,000.0000 98.249 9 ---1,964,998.18 -1,997,363.20 -- 32,365.0 2 SEI 15-May- 25 13-May- 25 15-May-25 38151LAG5 P 10 PURCHASED PAR VALUE OF GOLDMAN SACHS BK 5.414% 5/21/27 /BOFA SECURITIES, INC./FXD INC/XXXX 7,500,000 PAR VALUE AT 100.625 % 7,500,000.0000 100.62 50 ----7,546,875.00 7,546,875.00 --SEI 15-May- 25 15-May- 25 15-May-25 3133TCE95 FHL3032 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 4.598% 8/15/32 -29.8000 ----29.80 -29.83 --0.03 SEI 15-May- 25 15-May- 25 15-May-25 43815BAC4 HAR1826 P 20 PAID DOWN PAR VALUE OF HONDA AUTO REC OWN 1.880% 5/15/26 -158,762.6500 ----158,762.65 -158,738.77 -23.88 SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 28 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 15-May- 25 15-May- 25 15-May-25 47800AAC4 JDO6827 P 20 PAID DOWN PAR VALUE OF JOHN DEERE OWNR TR 3.740% 2/16/27 -216,138.9200 ----216,138.92 -216,118.28 -20.64 SEI 15-May- 25 15-May- 25 15-May-25 47800BAC2 JDO5027 P 20 PAID DOWN PAR VALUE OF JOHN DEERE OWNER 5.090% 6/15/27 -259,986.7300 ----259,986.73 -259,966.56 -20.17 SEI 15-May- 25 15-May- 25 15-May-25 31348SWZ3 786064F P 20 PAID DOWN PAR VALUE OF F H L M C #786064 6.262% 1/01/28 APRIL FHLMC DUE 5/15/25 -6.8200 ----6.82 -6.65 -0.17 SEI 15-May- 25 15-May- 25 15-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -215,315.1500 ----215,315.15 -215,315.15 --SEI 15-May- 25 15-May- 25 15-May-25 02582JJT8 P 20 PAID DOWN PAR VALUE OF AMERICAN EXPRESS 3.390% 5/17/27 CMO FINAL PAYDOWN - 6,620,000.0000 ----6,620,000.00 -6,618,535.66 -1,464.34 SEI 15-May- 25 15-May- 25 15-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 1,125,463.9800 -----1,125,463.98 1,125,463.98 --SEI 15-May- 25 15-May- 25 15-May-25 91282CDG3 P 20 SOLD PAR VALUE OF U S TREASURY NT 1.125% 10/31/26 /J.P. MORGAN SECURITIES LLC/1,000,000 PAR VALUE AT 95.812165 % - 1,000,000.0000 95.812 2 ---958,121.65 -995,195.31 -- 37,073.6 6 SEI Post Date 15-May-25 Total ---1,965,442.62 -1,788,930.43 -- 67,909.5 1 SEI 19-May- 25 19-May-25 06406HCQ0 I 310 INTEREST EARNED ON BANK OF NEW YORK MTN 3.950% 11/18/25 $1 PV ON 1500000.0000 SHARES DUE 5/18/2025 -----29,625.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 29 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 19-May- 25 19-May- 25 19-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 29,625.0000 -----29,625.00 29,625.00 --SEI Post Date 19-May-25 Total ----29,625.00 --SEI 20-May- 25 20-May-25 92348KBG7 I 310 INTEREST EARNED ON VERIZON MASTER TR 4.490% 1/22/29 $1 PV ON 16669.1300 SHARES DUE 5/20/2025 $0.00374/PV ON 4,455,000.00 PV DUE 5/20/25 -----16,669.13 ---SEI 20-May- 25 20-May-25 36225CN28 080408M I 310 INTEREST EARNED ON G N M A I I #080408 4.875% 5/20/30 $1 PV ON 59.9800 SHARES DUE 5/20/2025 APRIL GNMA DUE 5/20/25 -----59.98 ---SEI 20-May- 25 20-May-25 36225DCB8 080965M I 310 INTEREST EARNED ON G N M A I I #080965 4.625% 7/20/34 $1 PV ON 49.5900 SHARES DUE 5/20/2025 APRIL GNMA DUE 5/20/25 -----49.59 ---SEI 20-May- 25 20-May-25 36225CAZ9 080023M I 310 INTEREST EARNED ON G N M A I I #080023 4.750% 12/20/26 $1 PV ON 6.8600 SHARES DUE 5/20/2025 APRIL GNMA DUE 5/20/25 -----6.86 ---SEI 20-May- 25 20-May-25 36225CC20 080088M I 310 INTEREST EARNED ON G N M A I I #080088 5.000% 6/20/27 $1 PV ON 9.3700 SHARES DUE 5/20/2025 APRIL GNMA DUE 5/20/25 -----9.37 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 30 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 20-May- 25 20-May-25 36225CNM4 080395M I 310 INTEREST EARNED ON G N M A I I #080395 4.875% 4/20/30 $1 PV ON 6.4600 SHARES DUE 5/20/2025 APRIL GNMA DUE 5/20/25 -----6.46 ---SEI 20-May- 25 20-May-25 89239NAD7 I 310 INTEREST EARNED ON TOYOTA LEASE OWNER 4.750% 2/22/28 $1 PV ON 17329.5800 SHARES DUE 5/20/2025 $0.00396/PV ON 4,378,000.00 PV DUE 5/20/25 -----17,329.58 ---SEI 20-May- 25 20-May-25 92348KDY6 I 310 INTEREST EARNED ON VERIZON MASTER TRUST 4.510% 3/20/30 $1 PV ON 29055.6700 SHARES DUE 5/20/2025 $0.00376/PV ON 7,731,000.00 PV DUE 5/20/25 -----29,055.67 ---SEI 20-May- 25 20-May- 25 20-May-25 36225DCB8 080965M P 20 PAID DOWN PAR VALUE OF G N M A I I #080965 4.625% 7/20/34 APRIL GNMA DUE 5/20/25 -119.4600 ----119.46 -119.39 -0.07 SEI 20-May- 25 20-May- 25 20-May-25 36225CAZ9 080023M P 20 PAID DOWN PAR VALUE OF G N M A I I #080023 4.750% 12/20/26 APRIL GNMA DUE 5/20/25 -183.3000 ----183.30 -186.33 --3.03 SEI 20-May- 25 20-May- 25 20-May-25 36225CN28 080408M P 20 PAID DOWN PAR VALUE OF G N M A I I #080408 4.875% 5/20/30 APRIL GNMA DUE 5/20/25 -223.2200 ----223.22 -220.95 -2.27 SEI 20-May- 25 20-May- 25 20-May-25 36225CC20 080088M P 20 PAID DOWN PAR VALUE OF G N M A I I #080088 5.000% 6/20/27 APRIL GNMA DUE 5/20/25 -89.8500 ----89.85 -91.82 --1.97 SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 31 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 20-May- 25 20-May- 25 20-May-25 36225CNM4 080395M P 20 PAID DOWN PAR VALUE OF G N M A I I #080395 4.875% 4/20/30 APRIL GNMA DUE 5/20/25 -51.1400 ----51.14 -50.68 -0.46 SEI 20-May- 25 20-May- 25 20-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 17,468.3600 -----17,468.36 17,468.36 --SEI 20-May- 25 20-May- 25 20-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 46,385.2500 -----46,385.25 46,385.25 --SEI Post Date 20-May-25 Total ----63,184.44 --2.20 SEI 21-May- 25 21-May-25 38151LAG5 I 310 INTEREST EARNED ON GOLDMAN SACHS BK 5.414% 5/21/27 $1 PV ON 7500000.0000 SHARES DUE 5/21/2025 -----203,025.00 ---SEI 21-May- 25 21-May- 25 21-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 203,025.0000 -----203,025.00 203,025.00 --SEI Post Date 21-May-25 Total ----203,025.00 --SEI 27-May- 25 27-May-25 3136AJZP4 I 310 INTEREST EARNED ON F N M A GTD REMIC 1.500% 4/25/29 $1 PV ON 1029.2200 SHARES DUE 5/25/2025 $0.00125/PV ON 823,370.76 PV DUE 5/25/25 -----1,029.22 ---SEI 27-May- 25 27-May-25 3137FETN0 FHL0428B I 310 INTEREST EARNED ON F H L M C MLTCL MT 3.350% 1/25/28 $1 PV ON 23561.6600 SHARES DUE 5/25/2025 $0.00279/PV ON 8,440,000.00 PV DUE 5/25/25 -----23,561.66 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 32 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 27-May- 25 27-May-25 31397QRE0 FNM2841 I 310 INTEREST EARNED ON F N M A GTD REMIC 2.472% 2/25/41 $1 PV ON 245.5900 SHARES DUE 5/25/2025 $0.00429/PV ON 57,244.22 PV DUE 5/25/25 -----245.59 ---SEI 27-May- 25 27-May-25 31371NUC7 257179A I 310 INTEREST EARNED ON F N M A #257179 4.500% 4/01/28 $1 PV ON 7.0800 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----7.08 ---SEI 27-May- 25 27-May-25 31417YAY3 MA0022A I 310 INTEREST EARNED ON F N M A #MA0022 4.500% 4/01/29 $1 PV ON 11.0000 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----11.00 ---SEI 27-May- 25 27-May-25 31407BXH7 826080A I 310 INTEREST EARNED ON F N M A #826080 5.000% 7/01/35 $1 PV ON 24.3800 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----24.38 ---SEI 27-May- 25 27-May-25 31403GXF4 748678A I 310 INTEREST EARNED ON F N M A #748678 5.000% 10/01/33 $1 PV ON 1.7000 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----1.70 ---SEI 27-May- 25 27-May-25 31410F4V4 888336A I 310 INTEREST EARNED ON F N M A #888336 5.000% 7/01/36 $1 PV ON 208.4300 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----208.43 ---SEI 27-May- 25 27-May-25 31403DJZ3 745580A I 310 INTEREST EARNED ON F N M A #745580 5.000% 6/01/36 $1 PV ON 125.8600 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----125.86 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 33 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 27-May- 25 27-May-25 857449AC6 I 310 INTEREST EARNED ON STATE STREET BANK 4.594% 11/25/26 $1 PV ON 12500000.0000 SHARES DUE 5/25/2025 -----287,125.00 ---SEI 27-May- 25 27-May-25 31376KT22 357969A I 310 INTEREST EARNED ON F N M A #357969 5.000% 9/01/35 $1 PV ON 125.8100 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----125.81 ---SEI 27-May- 25 27-May-25 3138EG6F6 AL0869A I 310 INTEREST EARNED ON F N M A #AL0869 4.500% 6/01/29 $1 PV ON 6.7400 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----6.74 ---SEI 27-May- 25 27-May-25 31406PQY8 815971A I 310 INTEREST EARNED ON F N M A #815971 5.000% 3/01/35 $1 PV ON 168.8500 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----168.85 ---SEI 27-May- 25 27-May-25 31406XWT5 823358A I 310 INTEREST EARNED ON F N M A #823358 6.504% 2/01/35 $1 PV ON 63.3600 SHARES DUE 5/25/2025 APRIL FNMA DUE 5/25/25 -----63.36 ---SEI 27-May- 25 27-May-25 3137BSRE5 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 3.120% 9/25/26 $1 PV ON 14872.6700 SHARES DUE 5/25/2025 $0.00260/PV ON 5,720,259.00 PV DUE 5/25/25 -----14,872.67 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 34 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 27-May- 25 27-May-25 3137FG6X8 FHL3828B I 310 INTEREST EARNED ON F H L M C MLTCL MT 3.850% 5/25/28 $1 PV ON 23260.4100 SHARES DUE 5/25/2025 $0.00321/PV ON 7,250,000.00 PV DUE 5/25/25 -----23,260.41 ---SEI 27-May- 25 27-May-25 05592XAD2 BVO5428 I 310 INTEREST EARNED ON BMW VEH OWNER TR 5.470% 2/25/28 $1 PV ON 5665.9600 SHARES DUE 5/25/2025 $0.00456/PV ON 1,242,988.98 PV DUE 5/25/25 -----5,665.96 ---SEI 27-May- 25 27-May-25 3137HB3D4 FHL5028 I 310 INTEREST EARNED ON F H L M C MLTCL 5.069% 10/25/28 $1 PV ON 45266.1700 SHARES DUE 5/25/2025 $0.00422/PV ON 10,716,000.00 PV DUE 5/25/25 -----45,266.17 ---SEI 27-May- 25 27-May-25 3137HDJJ0 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 4.803% 5/25/29 $1 PV ON 36022.5000 SHARES DUE 5/25/2025 $0.00400/PV ON 9,000,000.00 PV DUE 5/25/25 -----36,022.50 ---SEI 27-May- 25 27-May-25 3137HBPD0 FHL5429 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 5.400% 1/25/29 $1 PV ON 45000.0000 SHARES DUE 5/25/2025 $0.00450/PV ON 10,000,000.00 PV DUE 5/25/25 -----45,000.00 ---SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 35 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 27-May- 25 27-May-25 31394JY35 FHL9543 I 310 INTEREST EARNED ON F H L M C MLTCL MT 6.49999% 9/25/43 $1 PV ON 1606.6700 SHARES DUE 5/25/2025 $0.00542/PV ON 296,615.98 PV DUE 5/25/25 -----1,606.67 ---SEI 27-May- 25 27-May-25 3137HCKV3 I 310 INTEREST EARNED ON F H L M C MLTCL MTG 5.180% 3/25/29 $1 PV ON 27281.3300 SHARES DUE 5/25/2025 $0.00432/PV ON 6,320,000.00 PV DUE 5/25/25 -----27,281.33 ---SEI 27-May- 25 25-May- 25 27-May-25 3136AJZP4 P 20 PAID DOWN PAR VALUE OF F N M A GTD REMIC 1.500% 4/25/29 -30,383.4000 ----30,383.40 -27,756.47 -2,626.93 SEI 27-May- 25 25-May- 25 27-May-25 31397QRE0 FNM2841 P 20 PAID DOWN PAR VALUE OF F N M A GTD REMIC 2.472% 2/25/41 -456.0700 ----456.07 -455.93 -0.14 SEI 27-May- 25 25-May- 25 27-May-25 31376KT22 357969A P 20 PAID DOWN PAR VALUE OF F N M A #357969 5.000% 9/01/35 APRIL FNMA DUE 5/25/25 -215.5900 ----215.59 -231.76 --16.17 SEI 27-May- 25 25-May- 25 27-May-25 31406XWT5 823358A P 20 PAID DOWN PAR VALUE OF F N M A #823358 6.504% 2/01/35 APRIL FNMA DUE 5/25/25 -124.4400 ----124.44 -123.47 -0.97 SEI 27-May- 25 25-May- 25 27-May-25 31403GXF4 748678A P 20 PAID DOWN PAR VALUE OF F N M A #748678 5.000% 10/01/33 APRIL FNMA DUE 5/25/25 -3.4000 ----3.40 -3.66 --0.26 SEI 27-May- 25 25-May- 25 27-May-25 31371NUC7 257179A P 20 PAID DOWN PAR VALUE OF F N M A #257179 4.500% 4/01/28 APRIL FNMA DUE 5/25/25 -85.0200 ----85.02 -89.92 --4.90 SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 36 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 27-May- 25 25-May- 25 27-May-25 31406PQY8 815971A P 20 PAID DOWN PAR VALUE OF F N M A #815971 5.000% 3/01/35 APRIL FNMA DUE 5/25/25 -1,688.8700 ----1,688.87 -1,815.54 --126.67 SEI 27-May- 25 25-May- 25 27-May-25 31410F4V4 888336A P 20 PAID DOWN PAR VALUE OF F N M A #888336 5.000% 7/01/36 APRIL FNMA DUE 5/25/25 -629.7100 ----629.71 -676.94 --47.23 SEI 27-May- 25 25-May- 25 27-May-25 31407BXH7 826080A P 20 PAID DOWN PAR VALUE OF F N M A #826080 5.000% 7/01/35 APRIL FNMA DUE 5/25/25 -46.9800 ----46.98 -50.50 --3.52 SEI 27-May- 25 25-May- 25 27-May-25 31403DJZ3 745580A P 20 PAID DOWN PAR VALUE OF F N M A #745580 5.000% 6/01/36 APRIL FNMA DUE 5/25/25 -385.3700 ----385.37 -414.27 --28.90 SEI 27-May- 25 25-May- 25 27-May-25 3138EG6F6 AL0869A P 20 PAID DOWN PAR VALUE OF F N M A #AL0869 4.500% 6/01/29 APRIL FNMA DUE 5/25/25 -59.5500 ----59.55 -62.98 --3.43 SEI 27-May- 25 25-May- 25 27-May-25 31417YAY3 MA0022A P 20 PAID DOWN PAR VALUE OF F N M A #MA0022 4.500% 4/01/29 APRIL FNMA DUE 5/25/25 -90.9700 ----90.97 -96.21 --5.24 SEI 27-May- 25 25-May- 25 27-May-25 05592XAD2 BVO5428 P 20 PAID DOWN PAR VALUE OF BMW VEH OWNER TR 5.470% 2/25/28 -91,200.7300 ----91,200.73 -91,184.57 -16.16 SEI 27-May- 25 25-May- 25 27-May-25 31394JY35 FHL9543 P 20 PAID DOWN PAR VALUE OF F H L M C MLTCL MT 6.49999% 9/25/43 -1,763.7500 ----1,763.75 -1,997.45 --233.70 SEI 27-May- 25 27-May- 25 27-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 346,874.0500 -----346,874.05 346,874.05 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 37 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 27-May- 25 27-May- 25 27-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 291,940.1900 -----291,940.19 291,940.19 --SEI Post Date 27-May-25 Total ----513,854.57 -2,174.18 SEI 29-May- 25 29-May-25 91282CFJ5 I 300 PAID ACCRUED INTEREST ON PURCHASE OF U S TREASURY NT 3.125% 8/31/29 ------48,148.78 ---SEI 29-May- 25 29-May-25 30303M8S4 I 301 RECEIVED ACCRUED INTEREST ON SALE OF META PLATFORMS INC 4.300% 8/15/29 -----78,260.00 ---SEI 29-May- 25 28-May- 25 29-May-25 91282CFJ5 P 10 PURCHASED PAR VALUE OF U S TREASURY NT 3.125% 8/31/29 /BMO-CHICAGO BRANCH/6,300,000 PAR VALUE AT 96.48046873 % 6,300,000.0000 96.480 5 ----6,078,269.53 6,078,269.53 --SEI 29-May- 25 28-May- 25 29-May-25 30303M8S4 P 20 SOLD PAR VALUE OF META PLATFORMS INC 4.300% 8/15/29 /J.P. MORGAN SECURITIES LLC/XOTC 6,300,000 PAR VALUE AT 100.018 % - 6,300,000.0000 100.01 80 ---6,301,134.00 -6,329,547.00 -28,413.00 -SEI 29-May- 25 29-May- 25 29-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 252,975.6900 -----252,975.69 252,975.69 --SEI 29-May- 25 29-May- 25 29-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 2,308,882.5000 ----2,308,882.50 -2,308,882.50 --SEI 29-May- 25 29-May- 25 29-May-25 880590GF5 P 10 PURCHASED PAR VALUE OF T V A DISC NTS 5/30/25 /MORGAN STANLEY & CO. LLC/XOTC 15,300,000 PAR VALUE AT 99.98830556 % 15,300,000.000 0 99.988 3 ----15,298,210.75 15,298,210.75 --SEI Post Date 29-May-25 Total ----12,989,328.25 12,991,026.47 -28,413.00 -SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 38 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System 30-May- 25 29-May-25 4581X0DV7 I 301 RECEIVED ACCRUED INTEREST ON SALE OF INTER AMER BK M T N 0.875% 4/20/26 -----12,673.65 ---SEI 30-May- 25 30-May-25 880590GF5 I 310 INTEREST EARNED ON T V A DISC NTS 5/30/25 $1 PV ON 15300000.0000 SHARES DUE 5/30/2025 15,300,000 PAR VALUE AT 100 % -----1,789.25 ---SEI 30-May- 25 30-May-25 P 210 CASH DISBURSEMENT PAID TO ORANGE COUNTY SANITATION DISTRICT OUTGOING DOMESTIC WIRE TRANSFER FROM LONG TERM PORTFOLIO ------15,000,000.00 ---SEI 30-May- 25 28-May- 25 29-May-25 4581X0DV7 P 20 SOLD PAR VALUE OF INTER AMER BK M T N 0.875% 4/20/26 /GOLDMAN SACHS & CO. LLC/13,370,000 PAR VALUE AT 97.058 % - 13,370,000.000 0 97.058 0 ---12,976,654.60 - 13,308,765.40 -- 332,110. 80 SEI 30-May- 25 30-May- 25 30-May-25 880590GF5 P 20 MATURED PAR VALUE OF T V A DISC NTS 5/30/25 15,300,000 PAR VALUE AT 100 % - 15,300,000.000 0 100.00 00 ---15,298,210.75 - 15,298,210.75 --SEI 30-May- 25 30-May- 25 30-May-25 31846V567 FGZXX P 10 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 2,310,671.7500 -----2,310,671.75 2,310,671.75 --SEI 30-May- 25 30-May- 25 30-May-25 31846V567 FGZXX P 20 SOLD UNITS OF FIRST AM GOVT OB FD CL Z - 2,010,671.7500 ----2,010,671.75 -2,010,671.75 --SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 39 of 40 Multiple Accounts Begin Date : 05/01/2025 End Date : 05/31/2025 Account Information Account Number Account Name 6745046601 OCSD LONG-TERM PORTFOLIO Transactions Post Date Trade Date Settlement Date CUSIP Ticker SEDOL Port P/I Tran Type Explanation Units Price Comm SEC Fee Misc Fee Net Cash Amount Cost Short Term Gain/Loss Long Term Gain Loss Source System Post Date 30-May-25 Total ---12,989,328.25 - 28,306,976.15 -- 332,110. 80 SEI Account 6745046601 Total ----- 14,391,633.79 20,381.63 - 582,485. 91 SEI Account Ending Cash Principal Cash: -99,100,063.01 Income Cash: 99,100,063.01 Total Cash: - Grand Total ----- 43,652,081.09 162,463.42 - 582,485. 91 SEI TRANSACTIONS - SUMMARY Run Date : 06/01/2025 Page 40 of 40 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4035 Agenda Date:6/25/2025 Agenda Item No:4. FROM:Robert Thompson, General Manager Originator: Kelly A. Lore, Clerk of the Board SUBJECT: COMMITTEE MEETING MINUTES GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the following: A. Minutes of the Steering Committee Meeting held April 23, 2025 B. Minutes of the Operations Committee Meeting held May 7, 2025 C. Minutes of the Administration Committee Meeting held May 14, 2025 BACKGROUND In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting will be provided to the Directors for subsequent approval at the following meeting. RELEVANT STANDARDS ·Resolution No. OC SAN 24-09 ADDITIONAL INFORMATION The minutes of the Committee meetings are approved at their respective Committees and brought forth to the Board of Directors for receive and file only. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Minutes of the Monthly Committee Meetings Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ Orange County Sanitation District Minutes for the STEERING COMMITTEE Wednesday, April 23, 2025 5:00 PM Huntington Beach Room Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Steering Committee of the Orange County Sanitation District was called to order by Board Vice-Chairman Jon Dumitru on Wednesday, April 23, 2025 at 5:00 p.m. in the Orange County Sanitation District Headquarters. ROLL CALL AND DECLARATION OF QUORUM: The Clerk of the Board declared a quorum present as follows: PRESENT:Jon Dumitru, Pat Burns, Glenn Grandis, Christine Marick, Chad Wanke and John Withers ABSENT:Ryan Gallagher STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Kelly Lore, Clerk of the Board; Morty Caparas; Jackie Castro; Daisy Covarrubias; Don Cutler; Thys DeVries; Martin Dix; Al Garcia; Mark Kawamoto; Rob Michaels; Kelly Newell; Shallee Riley;Thomas Vu; Kevin Work; Sammady Yi; and Ruth Zintzun were present in the Huntington Beach Room. OTHERS PRESENT: Ryan Baron, General Counsel; and Laura Drottz Kalty, Special Counsel, Liebert Cassidy Whitmore, were present in the Huntington Beach Room. PUBLIC COMMENTS: None. REPORTS: Vice Chair Dumitru and General Manager Rob Thompson did not provide a report. CONSENT CALENDAR: 1.APPROVAL OF MINUTES 2025-4206 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Page 1 of 4 STEERING COMMITTEE Minutes April 23, 2025 Approve minutes of the Regular meeting of the Steering Committee held March 26, 2025. AYES:Jon Dumitru, Pat Burns, Glenn Grandis, Christine Marick and Chad Wanke NOES:None ABSENT:Ryan Gallagher and John Withers ABSTENTIONS:None 2. DIGITAL ASSET MANAGEMENT STUDY, PROJECT NO. PS23-04 2025-4247 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: A. Approve an Amended Professional Services Agreement with Black & Veatch Corporation to provide engineering services for the Digital Asset Management Study, Project No. PS23-04, for an amount not to exceed $799,917; and B. Approve a contingency of $79,992 (10%). AYES:Jon Dumitru, Pat Burns, Glenn Grandis, Christine Marick and Chad Wanke NOES:None ABSENT:Ryan Gallagher and John Withers ABSTENTIONS:None NON-CONSENT: 3. SELECTION OF HONOR WALL RECIPIENTS 2025-4048 Originator: Rob Thompson MOVED, SECONDED, AND DULY CARRIED TO: A.Approve nominated former employees Brian Bingman, Jim Herberg, Mike McCarthy, and Yu-Li Tsai as Honor Wall recipients for the year 2025; and B. Approve former Board Member Greg Sebourn, as Honor Wall recipient for the year 2025. AYES:Jon Dumitru, Pat Burns, Glenn Grandis, Christine Marick and Chad Wanke NOES:None ABSENT:Ryan Gallagher and John Withers ABSTENTIONS:None Page 2 of 4 STEERING COMMITTEE Minutes April 23, 2025 Director John Withers arrived at the meeting at approximately 5:02 p.m. 4.PAYMENT AGREEMENT FOR CHARGES AND FEES OWED BY MBV-CA, LLC INDUSTRIAL WASTEWATER DISCHARGE PERMITTEE 2025-4236 Originator: Wally Ritchie Director of Finance Wally Ritchie provided an overview of the item. MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Approve the Payment Agreement for charges owed for user fees with MBV-CA, LLC, an Industrial Wastewater Discharge Permittee, in the amount of $560,308.71. AYES:Jon Dumitru, Pat Burns, Glenn Grandis, Christine Marick, Chad Wanke and John Withers NOES:None ABSENT:Ryan Gallagher ABSTENTIONS:None INFORMATION ITEMS: None. DEPARTMENT HEAD REPORTS: None. CLOSED SESSION: CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTION 54957.6. The Committee convened in closed session at 5:04 p.m. Confidential minutes of the Closed Sessions have been prepared in accordance with the above Government Code Sections and are maintained by the Clerk of the Board in the Official Book of Confidential Minutes of Board and Committee Closed Session meetings. CS-1 CONFERENCE WITH LABOR NEGOTIATORS - GOVERNMENT CODE SECTION 54957.6 2025-4229 CONVENED IN CLOSED SESSION: Page 3 of 4 STEERING COMMITTEE Minutes April 23, 2025 Designated Representatives: General Manager Robert Thompson, Assistant General Manager Lorenzo Tyner, Director of Human Resources Laura Maravilla, and Chief Negotiator Laura Kalty. Employee Organizations: (3) International Union of Operating Engineers, Local 501; Orange County Employees Association; and the Supervisory and Professional Management Group. RECONVENED IN REGULAR SESSION. The Committee reconvened in regular session at 5:55 p.m. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: General Counsel Ryan Baron stated there was no reportable action. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: Vice-Chair Dumitru declared the meeting adjourned at 5:55 p.m. to the next Regular Steering Committee meeting to be held on Wednesday, May 28, 2025 at 5:00 p.m. Submitted by: __________________ Kelly A. Lore, MMC Clerk of the Board Page 4 of 4 Orange County Sanitation District Minutes for the OPERATIONS COMMITTEE Wednesday, May 7, 2025 5:00 PM Board Room Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Operations Committee of the Orange County Sanitation District was called to order by Committee Chairman Pat Burns on Wednesday, May 7, 2025 at 5:00 p.m. in the Orange County Sanitation District Headquarters. General Manager Rob Thompson led the Pledge of Allegiance. ROLL CALL AND DECLARATION OF QUORUM: Clerk of the Board Kelly Lore declared a quorum present as follows: PRESENT:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Johnathan Ryan Hernandez, Lisa Landau, Carlos Leon, Tom Lindsey, Scott Minikus, Robert Ooten, Jamie Valencia and Cindy Tran (Alternate) ABSENT:None STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Mike Dorman, Director of Engineering; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; Jon Bradley; Cheri Calisang; Morty Caparas; Jackie Castro; Sam Choi; Raul Cuellar; Don Cutler; Thys DeVries; Martin Dix; Justin Fenton; David Haug; Mark Kawamoto; Tom Meregillano; Nick Oswald; Jonathon Powell; Olga Prado; Valerie Ratto; Sammady Yi; and Ruth Zintzun were present in the Board Room. OTHERS PRESENT: Mal Richardson, General Counsel; and Gus Garcia, Center for Contract Compliance were present in the Board Room. PUBLIC COMMENTS: Gus Garcia, Center for Contract Compliance commented in opposition of Item No. 3 and provided a letter for distribution to the Directors. REPORTS: Chair Burns announced that the OC San Honor Wall Ceremony would be held on June 23, 2025, at 3:30 p.m. and that OC San's Administrative Offices would be closed on Monday, May 26th in observance of Memorial Day. General Manager Rob Thompson announced that it was Municipal Clerks Week and acknowledged the Clerk of the Board and the Assistant Clerk of the Board. Page 1 of 6 OPERATIONS COMMITTEE Minutes May 7, 2025 CONSENT CALENDAR: 1.APPROVAL OF MINUTES 2025-4252 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Approve minutes of the Special meeting of the Operations Committee held April 2, 2025. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Carlos Leon, Tom Lindsey, Scott Minikus, Robert Ooten and Cindy Tran (Alternate) NOES:None ABSENT:Johnathan Ryan Hernandez and Jamie Valencia ABSTENTIONS:None 2.PURCHASE AND INSTALLATION OF CENTRIFUGE ISOLATORS AT PLANT NO. 1 2025-4107 Originator: Riaz Moinuddin MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: A. Approve a Sole Source General Services Contract to GEA Mechanical Equipment US, Inc. for the purchase and installation of isolator units on six (6) Thickening and Dewatering centrifuges, for a total amount not to exceed $696,726; and B. Approve a contingency of $69,673 (10%). AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Carlos Leon, Tom Lindsey, Scott Minikus, Robert Ooten and Cindy Tran (Alternate) NOES:None ABSENT:Johnathan Ryan Hernandez and Jamie Valencia ABSTENTIONS:None 3.SAFETY SHOWER AND EYEWASH STATIONS INSPECTIONS AND TESTING, SPECIFICATION NO. S-2025-669BD 2025-4228 Originator: Riaz Moinuddin MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Page 2 of 6 OPERATIONS COMMITTEE Minutes May 7, 2025 A. Receive and file Zeco, Inc. protest statement dated April 2, 2025; B. Receive and file Orange County Sanitation District’s Protest Response letter dated April 16, 2025; C. Approve a General Services Contract to Haws Corporation for Safety Shower and Eyewash Stations Inspections and Testing, Specification No. S-2025-669BD, for a total amount not to exceed $224,594; and D.Approve a contingency of $33,689 (15%). AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Carlos Leon, Tom Lindsey, Scott Minikus, Robert Ooten and Cindy Tran (Alternate) NOES:None ABSENT:Johnathan Ryan Hernandez and Jamie Valencia ABSTENTIONS:None 4.MANHOLE CCTV INSPECTION SERVICES, SPECIFICATION NO. S-2024-658BD 2025-4245 Originator: Riaz Moinuddin MOVED, SECONDED, AND DULY CARRIED TO: A. Approve a General Services Contract to Mattucci Plumbing, Inc. to perform manhole CCTV inspection services, Specification No. S-2024-658BD, for a total amount not to exceed $164,000, with four (4) one-year renewal options; and B. Approve an annual contingency of $16,400 (10%) increase over the prior year for all renewal periods. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Carlos Leon, Tom Lindsey, Scott Minikus, Robert Ooten and Cindy Tran (Alternate) NOES:None ABSENT:Johnathan Ryan Hernandez and Jamie Valencia ABSTENTIONS:None 5.BUILDING 6, CONTROL CENTER, AND LABORATORY ELEVATOR REHABILITATION AT PLANT NO. 1, PROJECT NO. FE24-06 2025-4280 Originator: Mike Dorman MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Page 3 of 6 OPERATIONS COMMITTEE Minutes May 7, 2025 A. Approve a Purchase Order Contract to TK Elevator (TKE) for Building 6, Control Center, and Laboratory Elevator Rehabilitation at Plant No. 1, Project No. FE24-06, using Sourcewell Cooperative Contract No. 080420-TKE, for a total amount not to exceed $633,000; and B. Approve a contingency of $126,600 (20%). AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Carlos Leon, Tom Lindsey, Scott Minikus, Robert Ooten and Cindy Tran (Alternate) NOES:None ABSENT:Johnathan Ryan Hernandez and Jamie Valencia ABSTENTIONS:None 6.QUARTERLY ODOR COMPLAINT REPORT 2025-4233 Originator: Riaz Moinuddin MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the Fiscal Year 2024-25 Third Quarter Odor Complaint Report. AYES:Joyce Ahn, Debbie Baker, Pat Burns, Doug Chaffee, Jon Dumitru, Ryan Gallagher, Lisa Landau, Carlos Leon, Tom Lindsey, Scott Minikus, Robert Ooten and Cindy Tran (Alternate) NOES:None ABSENT:Johnathan Ryan Hernandez and Jamie Valencia ABSTENTIONS:None NON-CONSENT: None. Director Jamie Valencia arrived at the meeting at approximately 5:07 p.m. and Director Johnathan Ryan Hernandez arrived at approximately 5:12 p.m. INFORMATION ITEMS: 7.FY 2025-26 CAPITAL IMPROVEMENT PROGRAM BUDGET UPDATE 2025-4074 Originator: Mike Dorman Director of Engineering Mike Dorman introduced Engineering Manager Justin Fenton and Finance Manager Ruth Zintzun who provided a joint PowerPoint presentation regarding the Capital Improvement Program (CIP) FY 2025-26 Budget Update which included an overview of the CIP Asset Management Plan, the proposed active and upcoming projects, net capital expenses overview and budget update, the 10-year net CIP outlay, the 20-year net CIP outlay, top budget increases and decreases, the FY Page 4 of 6 OPERATIONS COMMITTEE Minutes May 7, 2025 2025-26 CIP reserves, and key meeting dates. ITEM RECEIVED AS AN: Information Item. 8.OC SAN - OPERATIONS & MAINTENANCE WASTEWATER 101 PART 1: TREATMENT AND RECYCLING 2025-4070 Originator: Riaz Moinuddin Director of Operations & Maintenance Riaz Moinuddin introduced Operations Manager Jon Bradley who provided a PowerPoint presentation regarding the wastewater treatment process. The presentation included a diagram overview of the plant process, the metering and diversion structure, the preliminary and secondary treatments, illustrations of solids removal during treatment, the solids recovery process, dewatering operation, truck loading, and an overview of biogas. ITEM RECEIVED AS AN: Information Item. 9.STRATEGIC PLANNING - CORE VALUES 2025-4269 Originator: Laura Maravilla Director of Human Resources Laura Maravilla provided a PowerPoint presentation regarding OC San's core values. The presentation also provided an overview of upcoming topics scheduled for Committee meetings, including the level of service in June and the risk register in July. ITEM RECEIVED AS AN: Information Item. DEPARTMENT HEAD REPORTS: None. CLOSED SESSION: None. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. Page 5 of 6 OPERATIONS COMMITTEE Minutes May 7, 2025 BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: None. ADJOURNMENT: Chair Burns declared the meeting adjourned at 5:39 p.m. to the next Regular Operations Committee meeting to be held on Wednesday, June 4, 2025 at 5:00 p.m. Submitted by: __________________ Kelly A. Lore, MMC Clerk of the Board Page 6 of 6 Orange County Sanitation District Minutes for the ADMINISTRATION COMMITTEE Wednesday, May 14, 2025 5:00 PM Board Room Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 CALL TO ORDER A regular meeting of the Administration Committee of the Orange County Sanitation District was called to order by Committee Chairwoman Christine Marick on Wednesday, May 14, 2025 at 5:01 p.m. in the Orange County Sanitation District Headquarters. Director Weigand led the Pledge of Allegiance. General Counsel stated as a point of order, in accordance with OC San resolution, and the "just cause" provision in Government Code Section 54950 et seq., Director John Withers requested to teleconference during the meeting due to his travel on behalf of his agency. Without objection of the Committee members, Director Withers was approved to teleconference remotely and stated there was no one else at the remote location over the age of 18 years old. ROLL CALL AND DECLARATION OF QUORUM: The Clerk of the Board declared a quorum present as follows: PRESENT:Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) ABSENT:Andrew Nguyen STAFF PRESENT: Rob Thompson, General Manager; Lorenzo Tyner, Assistant General Manager; Jennifer Cabral, Director of Communications; Laura Maravilla, Director of Human Resources; Riaz Moinuddin, Director of Operations and Maintenance; Wally Ritchie, Director of Finance; Lan Wiborg, Director of Environmental Services; Kelly Lore, Clerk of the Board; Mo Abiodun; John Bradley; Jackie Castro; Sam Choi; Daisy Covarrubias; Rhea DeGuzman; Thys DeVries; Justin Fenton; Yocely Galindo; Al Garcia; Mark Kawamoto; Rebecca Long; Joe Manzella; Tom Meregillano; Aldwin Ramirez; Collette Stewart; Thomas Vu; Kevin Work; and Ruth Zintzun were present in the Board Room. OTHERS PRESENT: Scott Smith, General Counsel; Eric O'Donnell, Townsend Public Affairs; and P.J. Skarlanic, Alliant Insurance Services, were in attendance in the Board Room. PUBLIC COMMENTS: None. Clerk of the Board, Kelly Lore stated Late communication was received after the publication of the agenda regarding Item No. 4 and Item No. 15, and was presented to the Committee members and made available to the public. Page 1 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 REPORTS: Chair Marick announced the Honor Wall Ceremony would be held at 3:30 p.m. on June 25, 2025 prior to the Steering Committee Meeting. She further stated that OC San Administrative Offices would be closed on May 26th in observance of Memorial Day. General Manager Rob Thompson did not provide a report. NOTE: Due to teleconferencing, all votes were taken by roll call. CONSENT CALENDAR: 1.APPROVAL OF MINUTES 2025-4253 Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: Approve minutes of the Special meeting of the Administration Committee held April 9, 2025. AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 2.CONSOLIDATED FINANCIAL REPORT FOR THE THIRD QUARTER ENDED MARCH 31, 2025 2024-3833 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Receive and file the Orange County Sanitation District Third Quarter Financial Report for the period ended March 31, 2025. AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None Page 2 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 3.GENERAL MANAGER APPROVED PURCHASES AND ADDITIONS TO THE PRE-APPROVED OEM SOLE SOURCE LIST 2025-4268 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: A. Receive and file Orange County Sanitation District (OC San) purchases made under the General Manager’s authority for the period of January 1, 2025 to March 31, 2025; and B. Approve the following additions to the pre-approved Original Equipment Manufacturers (OEM) Sole Source List: ·MANITOWOC CRANE - Crane and Heavy Equipment Parts and Service ·MODEC USA INC - Portable Valve Actuators and Associated Equipment ·PITBULL INDUSTRIAL PUMPS - Pumps and Parts ·SPAANS BABCOCK - Parts and Equipment AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 4.MIGRATE PRIMAVERA P6 PROFESSIONAL TO PRIMAVERA P6 ENTERPRISE PROJECT PORTFOLIO MANAGEMENT 2025-4260 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Page 3 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 A. Approve a Purchase Order Contract to Mythics VIII, LLC for the purchase of Primavera P6 Enterprise Project Portfolio Management software licenses, utilizing the cooperative OMNIA Contract No. 182233-002 for a total amount not to exceed $112,728; B. Approve a Purchase Order Contract to Mythics VIII, LLC for Phase II Primavera Migration Services utilizing the cooperative OMNIA Contract No. 182233-002, for a total amount not to exceed $121,599; C. Approve a Purchase Order Contract to Carahsoft Technology Corp., for Phase III Primavera P6 Enterprise Project Portfolio Management system integrations utilizing Naspo ValuePoint Master Contract AR2472-CAR001-101, for a total amount not to exceed $101,271; and D. Approve a 10% contingency for each contract. AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 5.INTERNAL AUDIT UPDATE 2025-4281 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Receive and file the Orange County Sanitation District Enterprise Risk Assessment Report. AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 6.PURCHASE ORDER FOR CALIFORNIA RECREATION COMPANY MARINA SLIP RENTAL AGREEMENT 2025-4223 Originator: Lan Wiborg MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Page 4 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 A. Approve a purchase order to California Recreation Company (CRC) Marinas for the rental of an end tie boat slip in Newport Beach Harbor, in an amount not to exceed $159,794 for the period of July 1, 2025, through June 30, 2026, with nine (9) optional one-year renewals; and B. Approve an annual increase not to exceed 10% of the previous year’s amount. AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 7.OCEAN ACIDIFICATION AND HYPOXIA MINI-MOORING 2025-4225 Originator: Lan Wiborg MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: A. Approve a Sole Source Service Contract with The Regents of the University of California on behalf of its San Diego campus’ Scripps Institution of Oceanography to build and maintain an ocean acidification and hypoxia (OAH) mini-mooring and to provide field and data support, in an amount not to exceed $290,000 for the period July 1, 2025, to June 30, 2026; B. Approve three (3) optional one-year renewals to maintain and calibrate the mini-mooring sensors as well as provide field and data support, in an amount not to exceed $130,000 for each renewal; and C. Approve a 10% contingency per year. AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 8.TRIPLE QUADRUPOLE INDUCTIVELY COUPLED PLASMA MASS SPECTROMETER 2025-4262 Originator: Lan Wiborg MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Page 5 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 A. Approve a Purchase Order to Avantor (VWR) for the purchase of a Triple Quadrupole Inductively Coupled Plasma Mass Spectrometer (TQ-ICP/MS) System using NASPO Master Agreement No. MA2024005 for a total amount not to exceed $328,000; and B. Approve a contingency of $16,400 (5%). AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 9.PUBLIC AFFAIRS UPDATE FOR THE MONTH OF APRIL 2025 2025-4152 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Receive and file the Public Affairs Update for the month of April 2025. AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 10.ELECTRONIC RECORDING MEMORANDUM OF UNDERSTANDING COUNTY OF ORANGE CLERK-RECORDER’S OFFICE 2025-4025 Originator: Jennifer Cabral MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: A. Approve the Memorandum of Understanding with the counties of Los Angeles, Orange, Riverside, and San Bernardino, for the use of the Statewide Electronic Courier Universal Recording Environment (SECURE) Government to Government (G2G) Portal for a term of five (5) years beginning June 15, 2025 through June 15, 2030; and B. Authorize the Clerk of the Board, or designee, to transmit/record any and all required Orange County Sanitation District real property documents in an electronic format with the County of Orange Clerk-Recorder’s Office. Page 6 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None 11.IBM TIVOLI MAXIMO ANNUAL SUBSCRIPTION AND SUPPORT, SPECIFICATION NO. S-2025-681BD 2025-4272 Originator: Wally Ritchie MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: A. Approve a Purchase Order Contract to Lantrasoft, Inc. to purchase IBM Tivoli Maximo application point licenses, Specification No. S-2025-681BD, for a total amount not to exceed $290,000; with four (4) one-year renewal options; and B. Approve an annual contingency in the amount of $43,500 (15%). AYES:Jon Dumitru, Ryan Gallagher, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Melinda Liu and Andrew Nguyen ABSTENTIONS:None NON-CONSENT: Director Melinda Liu arrived at the meeting at approximately 5:16 p.m. 12.LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF APRIL 2025 2025-4139 Originator: Jennifer Cabral Director of Communications Jennifer Cabral introduced the item and introduced Townsend Public Affairs Director Eric O'Donnell, who provided a PowerPoint presentation on the State Legislative Update. The presentation covered the Sacramento Legislative Overview, the state budget update, cap and trade, AB 643 (Wilson) - Organic Waste Procurement Target, SB 682 (Allen) - Non-Essential PFAS Use Ban, and the SB 496 (Hurtado) - Advanced Clean Fleets (ACF). MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Receive and file the Legislative Affairs Update for the month of April 2025. Page 7 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 AYES:Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Andrew Nguyen ABSTENTIONS:None 13.ADOPT ORANGE COUNTY SANITATION DISTRICT’S DEBT POLICY 2025-4214 Originator: Wally Ritchie Director of Finance Wally Ritchie provided an overview of OC San's Debt Policy. MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of Directors to: Adopt Resolution No. OC SAN 25-XX entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District Adopting the Orange County Sanitation District’s Debt Policy and Repealing Resolution No. OC SAN 23-22”. AYES:Jon Dumitru, Ryan Gallagher, Melinda Liu, Christine Marick, Jose Medrano, Jordan Nefulda, David Shawver, Chad Wanke, Erik Weigand, John Withers, Jordan Wu and Ted Bui (Alternate) NOES:None ABSENT:Andrew Nguyen ABSTENTIONS:None INFORMATION ITEMS: 14.INSURANCE UPDATE 2025-4246 Originator: Wally Ritchie Mr. Ritchie introduced the item and introduced Principal Staff Analyst Collette Stewart who provided a PowerPoint presentation regarding the FY 2025-26 Insurance Update. The presentation included an overview of insurance events, market drivers, OC San cost estimates and key meeting dates.Finance Manager Ruth Zintzun and P.J. Skarlanic, Senior Vice President, Alliant Insurance Services provided additional information. ITEM RECEIVED AS AN: Information Item. 15.FY 2025-26 CAPITAL IMPROVEMENT PROGRAM BUDGET UPDATE 2025-4285 Originator: Mike Dorman Page 8 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 Engineering Manager Justin Fenton provided a PowerPoint presentation regarding the Capital Improvement Program (CIP) FY 2025-26 Budget Update which included an overview of the CIP Asset Management Plan, the proposed active and upcoming projects, net capital expenses overview and budget update, the 10-year net CIP outlay, the 20-year net CIP outlay, top budget increases and decreases, the FY 2025-26 CIP reserves, and key meeting dates. ITEM RECEIVED AS AN: Information Item. 16.OC SAN - OPERATIONS & MAINTENANCE WASTEWATER 101 PART 1: TREATMENT AND RECYCLING 2025-4286 Originator: Riaz Moinuddin Director of Operations & Maintenance Riaz Moinuddin introduced Operations Manager Jon Bradley who provided a PowerPoint presentation regarding the wastewater treatment process. The presentation included a diagram overview of the plant process, the metering and diversion structure, the preliminary and secondary treatments, illustrations of solids removal during treatment, the solids recovery process, dewatering operation, truck loading, and an overview of biogas. ITEM RECEIVED AS AN: Information Item. 17.STRATEGIC PLANNING - CORE VALUES 2025-4287 Originator: Laura Maravilla Director of Human Resources Laura Maravilla provided a PowerPoint presentation regarding OC San's core values. The presentation also provided an overview of upcoming topics scheduled for Committee meetings, including the level of service in June and the risk register in July. ITEM RECEIVED AS AN: Information Item. DEPARTMENT HEAD REPORTS: None. Page 9 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 CLOSED SESSION: CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTION 54956.8. The Committee convened in closed session at 6:07 p.m. Confidential minutes of the Closed Sessions have been prepared in accordance with the above Government Code Sections and are maintained by the Clerk of the Board in the Official Book of Confidential Minutes of Board and Committee Closed Session meetings. CS-1 CONFERENCE WITH REAL PROPERTY NEGOTIATORS - GOVERNMENT CODE SECTION 54956.8 2025-4279 CONVENED IN CLOSED SESSION: Property: 10700 Spencer Street, Fountain Valley, CA - APN No.156-154-07 and 156-163-16. Agency negotiators: General Manager Rob Thompson; Assistant General Manager Lorenzo Tyner; and Director of Finance Wally Ritchie. Negotiating parties: Shabtai Itzhak Tr Ins Tr Under negotiation: Price and terms of payment RECONVENED IN REGULAR SESSION. The Committee reconvened in regular session at 6:25 p.m. CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED SESSION: General Counsel Scott Smith stated there was no reportable action. OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY: None. BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING: Alternate Director Bui thanked General Manager Thompson for his assistance in his preparation for the meeting. Page 10 of 11 ADMINISTRATION COMMITTEE Minutes May 14, 2025 ADJOURNMENT: Chair Marick declared the meeting adjourned at 6:26 p.m. to the next Regular Administration Committee meeting to be held on Wednesday, June 11, 2025 at 5:00 p.m. Submitted by: __________________ Kelly A. Lore, MMC Clerk of the Board Page 11 of 11 OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4325 Agenda Date:6/25/2025 Agenda Item No:5. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: ENGINEERING PROGRAM CONTRACT PERFORMANCE REPORT GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the Engineering Program Contract Performance Report for the period ending March 31, 2025; and for the period ending December 31, 2024. BACKGROUND The Engineering Program involves awarding and managing multiple construction and consulting contracts.In 2008,the Orange County Sanitation District (OC San)Board of Directors began authorizing contingencies along with construction and consulting contracts,allowing the General Manager to approve construction change orders and amendments to consulting contracts up to the amount of the authorized contingency.This practice reduces administrative costs,expedites resolution of project issues that arise,helps avoid contractor delay claims,and facilitates efficient management of many contracts. The Engineering Program Contract Performance Report summarizes construction and consulting contract performance and activities for the quarter ending March 31,2025.This report is updated quarterly and includes a summary of the General Manager approved contract contingencies among other key performance indicators. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Engineering Program Contract Performance Report for the period ending March 31, 2025 ·Engineering Program Contract Performance Report for the period ending December 31, 2024 MD:lb Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ Engineering Program Contract Performance Report For the Period Ending March 31, 2025 1 DATE: June 04, 2025 TO: Orange County Sanitation District Board of Directors FROM: Rob Thompson, General Manager Through: Mike Dorman, Director of Engineering This report summarizes the status, activities, and performance of construction contracts and consultant agreements. This report also identifies the names and status of projects being performed under master budgets for planning studies, research, small construction projects, Operations & Maintenance capital projects and information technology projects. As of March 31, 2025, Orange County Sanitation District (OC San) Engineering Department manages 136 active projects, with project budgeting totaling close to $4 billion. These projects are in various project phases, ranging from Project Development to Closeout. The graphic below shows the number of projects in each of the project phases. This report is organized into six parts, as follows. Detailed tables can be found in the appendix section of the report. Part 1 – Construction Contracts ................................................................................................. 2 Part 2 – Engineering Professional Services Agreements ........................................................... 4 Part 3 – Master Budget Projects ................................................................................................ 6 Part 4 – Supplemental Engineering Services Contract ............................................................... 7 Part 5 – Programming Professional Services Contract ............................................................... 9 Part 6 – On-Call Services Agreements ......................................................................................11 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 2 PART 1 – CONSTRUCTION CONTRACTS Construction Contracts As shown in the graph below, there are currently 52 active construction contracts totaling just over $1billion. The graph also categorizes the active construction contracts by project type (plant, collections, and other) with the “Other” category capturing research and small capital projects. Table 1 in the appendix lists the Board-awarded construction contracts while Tables 2 and 3 list the Operations Committee and General Manager awarded construction contracts, active as of March 31, 2025. The General Manager may award contracts up to $150,000 and task orders up to $500,000. The table below summarizes the number of active and closed construction contracts and total contract amounts. See Tables 4, 5, and 6 in the appendix for a list of the closed contracts. Type Contracts Total Contract Amount Active Board-Awarded Construction Contracts 50 $1,007,066,019 Active Ops Committee Awarded Construction Contracts 0 $0 Active GM Awarded Construction Contracts 2 $468,760 Closed Board-Awarded Construction Contracts 3 $5,260,799 Closed Committee-Awarded Construction Contracts 0 $0 Closed GM Awarded Construction Contracts 1 $153,450 $313 Million Collection Projects 11 Contracts Plant Projects 41 Contracts $684 Million Engineering Program Contract Performance Report For the Period Ending March 31, 2025 3 Cumulative Change Order Rates When the OC San Board of Directors awards a construction contract, they also approve a contingency which allows the General Manager to approve contract change orders up to the amount of the contingency. One purpose of this report is to document how much of the contingency is utilized. A contract’s change order rate is only meaningful when the work is completed. As such, this report's change order performance charts are based only on contracts closed since the Board began approving contingencies in 2008. The following chart shows how cumulative change order rates have changed for plant, collections, and all contracts over the past 15 years. Change Order Goals Project Type 15-Year Sliding Window Change Order Goal Plant – New 5% Plant – Rehab 8% Collections 10% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 4 PART 2 – ENGINEERING PROFESSIONAL SERVICES AGREEMENTS Professional Design and Related Service Agreements OC San engages engineering consultants through Professional Service Agreements (PSAs), Professional Design Services Agreements (PDSAs), and Professional Construction Services Agreements (PCSAs). PDSAs are used to obtain design engineering services, and PCSAs are a subsequent agreement with the design consultant to provide support services during construction. PSAs are used for planning studies and other consultant assignments. There are currently 50 Professional Design and Related Service Agreements (26 individual firms) with total agreement amount of $293,161,368. Table 7 in the appendix provides a detailed list of Professional Design and Related Service Agreements. Master Agreements Master Agreements are issued to a pool of pre-qualified consultants for smaller projects. On those smaller projects, OC San solicits task order proposals from interested firms and awards a task order to the most qualified consultant. The Master Agreements are listed below. • 2017 Master Agreements for Planning Studies (expired) • 2018 Master Professional Design Services Agreements (expired) • 2020 Master Agreements for On-Call Planning Studies (expired) • 2021 Master Professional Design Services Agreements (expired) • 2024 Master Agreements for On-Call Planning Studies • 2024 Master Professional Design Service Agreements • Agreement for Design Installation, Implementation and Maintenance of a Process Control System Engineering Program Contract Performance Report For the Period Ending March 31, 2025 5 New task orders cannot be issued under expired agreements but previously issued task orders remain active until completed. Task Orders are limited by OC San Ordinance No. OC SAN-61 to $500,000 per task order. Below is a summary of the various master agreements with active task orders. See Table 8 in the appendix for a detailed list of task orders. Task Order Contracts Total Contract Amount 2017 Master Agreements for Planning Studies 0 $0 2018 Master Professional Design Service Agreements 15 $3,033,474 2020 Master Agreements for On-Call Planning Studies 4 $1,174,966 2021 Master Professional Design Service Agreements 16 $4,139,422 2024 Master Agreements for On-Call Planning Studies 4 $1,249,850 2024 Master Professional Design Service Agreements 1 $325,715 Master Service Agreements Through a competitive procurement process, a Master Services Agreement (MSA) was awarded to ABB Inc. for the design, installation, implementation, and maintenance of a control system for a term of 15 years with renewals up to 25 years under Project SP-196, Process Control Systems Upgrades Study. Specific equipment and services will be procured under task orders associated with each CIP project and operating budget. Task Order Contracts Total Contract Amount Design Installation, Implementation and Maintenance of a Process Control System Master Agreement 2 $12,160,423 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 6 PART 3 – MASTER BUDGET PROJECTS The Board-adopted budget for Fiscal Years 2022-23 and 2023-24 includes master program budgets that allow staff to initiate, execute, and manage smaller projects that fit within the scope of a particular program more quickly. The projects chartered under these program budgets are referred to as sub-projects and are managed to the same standards as projects specifically listed in the adopted budget. A status table for each of these programs listing the sub-projects is attached in the appendix. These projects include Planning Studies (PS), Research (RE), Facility Engineering (FE), Maintenance (MP), and Small Capital (SC) and Information Technology (IT). Master Program Title Status Table Number of Projects Total Allocated Budget Planning Studies Program Table 9 18 $11,643,943 Research Program Table 10 2 $8,101,029 Small Construction Projects, Operations & Maintenance Capital Programs Table 11 42 $115,469,700 Information Technology Capital Program Table 12 8 $2,247,322 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 7 PART 4 – SUPPLEMENTAL ENGINEERING SERVICES CONTRACT In April of 2022, the OC San Board of Directors approved two Professional Service Agreements - one with AECOM Technical Services, Inc. and one with Jacobs Project Management Co. - to provide Supplemental Engineering Services for a three-year period commencing May 1, 2022, through April 30, 2025, with two one-year renewal options. The Board approved the agreements for an amount not to exceed $29,700,000 per individual agreement. The benefits of using a supplemental engineering services contract, as opposed to hiring full-time staff or limited-term employees, include rapid mobilization of highly skilled/technical staff, flexibility to change the mix of staff positions on an immediate and as-needed basis, the ability to reduce staff as workloads decrease, access to technical experts to support special tasks, and access to staff with wastewater project experience. Status tables for the supplemental engineering services contract and labor summary for the 2022 Supplemental Engineering Services Contract with AECOM and Jacobs Project Management Co. are included below. 2022 Supplemental Engineering Services Contract Status (AECOM) Total Fees Time Contract $29,700,000 60 Months(1) Actuals to Date $4,144,168 14% 35 Months 58% Remaining $25,555,832 86% 25 Months 42% (1) Assuming two additional 1-year extensions 2022 Supplemental Engineering Services Labor Summary (AECOM) This Quarter Inception to Date Labor Hours 4,185 22,761 Full Time Equivalents 9.30 4.34 Labor Costs (no expenses) $782,848 $4,058,040 Average Hourly Rate $187 $178 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 8 2022 Supplemental Engineering Services Contract Status (Jacobs) Total Fees Time Contract $29,700,000 60 Months(1) Actuals to Date $18,596,217 63% 35 Months 48% Remaining $11,103,783 37% 25 Months 52% (1) Assuming two additional 1-year extensions 2022 Supplemental Engineering Services Labor Summary (Jacobs) This Quarter Inception to Date Labor Hours 14,455 107,510 Full Time Equivalents 30 19 Labor Costs (no expenses) $2,642,558 $18,145,797 Average Hourly Rate $182 $183 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 9 PART 5 – PROGRAMMING PROFESSIONAL SERVICES CONTRACT In April of 2022, the OC San Board of Directors approved two Professional Service Agreements - one with Enterprise Automation and one with Rockwell Automation, Inc. (formerly Maverick Technologies) - to provide Programming Professional Services for a three-year period commencing May 11, 2022, through May 10, 2025, with two one-year renewal options. The Board approved the agreements for an amount not to exceed $4,900,000 per individual agreement. The programming professional services will program, test, commission, maintain, upgrade, and configure programmable logic controllers, HMI graphics, databases, servers, and networks for select projects. The benefits of using a programming professional services contract, as opposed to hiring full-time staff or limited-term employees, include the ability to provide the needed short-term resources during the execution of Project No. J-120, Process Control Systems Upgrades, rapid mobilization of highly skilled technical resources, flexibility to change the mix of needed resources to match project requirements, and the ability to increase or reduce project resources as workloads change. Status tables for the programming professional services contract and labor summary for the 2022 Programming Professional Services Contract with Enterprise Automation and Rockwell Automation are included below. 2022 Programming Professional Services Contract Status (Enterprise Automation) Total Fees Time Contract $4,900,000 60 Months(1) Actuals to Date $1,863,636 38% 35 Months 53% Remaining $3,043,927 62% 25 Months 47% (1) Assuming two additional 1-year extensions 2022 Programming Professional Services Labor Summary (Enterprise Automation) This Quarter Inception to Date Labor Hours 16 9,845 Full Time Equivalents 0 1.8 Labor Costs (no expenses) $3,634 $1,855,989 Average Hourly Rate $227 $189 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 10 2022 Programming Professional Services Contract Status (Rockwell Automation) Total Fees Time Contract $4,900,000 60 Months(1) Actuals to Date $1,711,624 35% 35 Months 58% Remaining $3,188,376 65% 25 Months 42% (1) Assuming two additional 1-year extensions 2022 Programming Professional Services Labor Summary (Rockwell Automation) This Quarter Inception to Date Labor Hours 806 8748 Full Time Equivalents 1.6 1.5 Labor Costs (no expenses) $164,383 $1,711,624 Average Hourly Rate $204 $196 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 11 PART 6 – ON-CALL SERVICES AGREEMENTS OC San uses three sets of on-call services agreements for coating inspection and corrosion testing; materials testing, inspection, and other geotechnical testing; and surveying. Services are typically requested by inspection supervisors as needs arise, and the work is generally spread among the available firms. The table below lists the contract limits and funds expended to date for each of the agreements which became effective on March 23, 2022, and will expire on April 30, 2025. For each of these services, OC San typically uses a single firm for a particular construction contract. Consultant Contract Limit Total Costs Incurred Remaining Coating Inspection Services (PSA2022-001) CSI Services, Inc. $300,000 $44,216 $255,784 Diversified Project Services Int'l (DPSI) $300,000 $222,404 $77,596 Geotechnical Testing Services (PSA2022-003) AESCO $400,000 $327,944 $72,056 Atlas Technical Consultants $400,000 $285,905 $114,095 Koury Engineering and testing, Inc. $400,000 $199,926 $200,074 MTGL, Inc $400,000 $371,307 $28,693 Surveying Services (PSA2022-002) D.Woolley & Associates $200,000 $66,518 $133,482 Michael Baker International, Inc. $200,000 $36,681 $163,320 Psomas $200,000 $73,958 $126,042 Stantec Consulting Services, Inc. $200,000 $50,450 $149,550 OC San uses an on-call corrosion engineering service agreement to perform condition assessments and an on-call corrosion engineering support agreement to support condition assessment and provide confined space entry support. Engineering Program Contract Performance Report For the Period Ending March 31, 2025 12 The table below lists the contract limits and funds expended to date for each of the agreements. The Corrosion Management Support Services is a one-year agreement with four one-year renewal options that became effective on February 1, 2020. The Condition Assessment On-Call Contractor Support Services is a one-year agreement with four one- year renewal options that became effective on November 1, 2021. Consultant Contract Limit Total Costs Incurred Remaining Corrosion Management Support Services Corrpro Companies Inc $700,000 $24,419 $675,581 Condition Assessment On-Call Contractor Support Services Jamison Engineering Contractors, Inc $783,470 $29,950 $483,520 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 13 APPENDIX Engineering Program Contract Performance Report For the Period Ending March 31, 2025 14 Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining 2-49 Taft Branch Improvements Big Ben Inc. 05/22/2024 $20,458,250 $0 $20,458,250 4.2% 10.0% 10.0% 0.0% 10.0% 3-64B Los Alamitos Trunk Sewer Rehabilitation Steve P. Rados, Inc. 05/26/2021 $17,775,000 $1,025,000 $18,800,000 88.2% 10.0% 10.0% 5.8% 4.2% 3-64C Los Alamitos Sub-Trunk and Westside Relief Interceptor Rehabilitation T.E. Roberts, Inc. 12/18/2024 $35,320,572 $0 $35,320,572 0.0% 10.0% 10.0% 0.0% 10.0% 3-67 Seal Beach Pump Station Replacement Walsh Construction Company II, LLC 12/14/2023 $97,032,743 $1,273 $97,034,016 8.6% 10.0% 10.0% 0.0% 10.0% 5-67 Bay Bridge Pump Station Replacement J.F. Shea Construction, Inc. 02/26/2025 $87,321,000 $0 $87,321,000 0.0% 10.0% 10.0% 0.0% 10.0% 7-65 Gisler-Red Hill Interceptor and Baker Force Main Rehabilitation Steve P. Rados, Inc. 05/24/2023 $44,706,000 ($1,067,300) $43,638,700 51.7% 10.0% 10.0% -2.4% 12.4% 7-68 MacArthur Force Main Improvements SRK Engineering, Inc. 07/26/2023 $3,897,000 $0 $3,897,000 84.3% 10.0% 10.0% 0.0% 10.0% FE18-13 Redhill Relief Sewer Relocation at State Route 55 SRK Engineering, Inc. 06/22/2022 $2,213,000 $683,317 $2,896,317 13.1% 15.0% 60.0% 30.9% 29.1% FE19-01 Pump Station Portable Generator Connectors Pacific Industrial Electric 09/29/2021 $1,207,479 $68,343 $1,275,822 99.5% 10.0% 16.0% 5.7% 10.3% FE19-02 Cengen Plant Water Pipe Replacement at Plant No. 1 Innovative Construction Solutions 03/27/2024 $3,385,000 $0 $3,385,000 0.0% 10.0% 10.0% 0.0% 10.0% FE19-03 Trickling Filter Sludge and Scum Pumps Replacement at Plant No. 1 Garney Pacific, Inc. 02/23/2022 $778,000 $23,471 $801,471 91.0% 10.0% 10.0% 3.0% 7.0% FE19-04 Sunflower Pump Replacement at Plant No. 1 GSE Construction Company, Inc. 10/27/2021 $2,123,200 $196,143 $2,319,343 82.7% 10.0% 25.0% 9.2% 15.8% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 15 Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining FE19-08 Secondary Treatment VFD Replacements at Plant No. 2 ACS Engineering 03/23/2022 $1,433,000 $0 $1,433,000 10.8% 10.0% 10.0% 0.0% 10.0% FE20-02 Digester C, D, F, and G Mechanical Rehabilitation at Plant No. 2 J.F. Shea Construction, Inc. 08/13/2024 $3,694,000 $0 $3,694,000 0.0% 10.0% 10.0% 0.0% 10.0% FE20-04 Cengen Cooling Water Pipe Replacement at Plant No. 2 Innovative Construction Solutions 11/16/2022 $3,487,600 $0 $3,487,600 47.5% 10.0% 10.0% 0.0% 10.0% FE20-05 Plant Water Piping Replacement at Secondary Clarifiers 1-26 at Plant No. 1 T.E. Roberts, Inc. 09/25/2024 $1,375,313 $0 $1,375,313 0.0% 10.0% 10.0% 0.0% 10.0% FE20-08 Olive Sub-Trunk Siphon Rehabilitation at Santa Ana River MMC, Inc. 04/26/2023 $1,944,000 $0 $1,944,000 80.3% 10.0% 10.0% 0.0% 10.0% FE21-07 Liquid Oxygen Tank A Replacement at Plant No. 2 J.R. Filanc Construction Company, Inc. 01/18/2023 $2,608,007 $0 $2,608,007 36.6% 10.0% 10.0% 0.0% 10.0% FE21-08 Newhope-Placentia Sewer Manhole Replacements Sancon Technologies Inc. 12/18/2024 $406,730 $0 $406,730 0.0% 20.0% 20.0% 0.0% 20.0% FE22-01 Platform Modifications for Process Areas at Plant No. 1 and No. 2 Tharsos, Inc. 12/18/2024 $494,494 $0 $494,494 0.0% 15.0% 15.0% 0.0% 15.0% FE22-02 Liquid Oxygen Tank B Replacement at Plant No. 2 J.R. Filanc Construction Company, Inc. 07/01/2024 $3,098,000 $0 $3,098,000 2.1% 10.0% 10.0% 0.0% 10.0% FE23-01 Digester Gas Compressor Dryer Replacements at Plant Nos. 1 and 2 Innovative Construction Solutions 09/10/2024 $5,942,500 $0 $5,942,500 0.0% 10.0% 10.0% 0.0% 10.0% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 16 Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining FE23-06 HVAC Replacements at Plant Nos. 1 and 2 ACCO Engineered Systems 07/24/2024 $1,698,204 $0 $1,698,204 0.0% 10.0% 10.0% 0.0% 10.0% FE23-08 Power Buildings 7 and 8 HVAC Replacement at Plant No. 1 Trane U.S. Inc. 10/02/2024 $687,708 $0 $687,708 0.0% 5.0% 5.0% 0.0% 5.0% FE23-09 Primary Clarifiers F and G Rotating Mechanism Rehabilitation at Plant No. 2 Vicon Enterprise 11/15/2024 $3,150,000 $0 $3,150,000 25.4% 15.0% 15.0% 0.0% 15.0% FR1-0005 Cengen and 12Kv Service Center Switchgear Battery System Upgrades at Plant No. 1 Mass Electric Construction Co. 11/27/2023 $970,000 $21,052 $991,052 88.0% 10.0% 20.0% 2.2% 17.8% FR1-0007R Control Center Offices and Day Training Room Remodeling at Plant No. 1 A2Z Construct Inc. 02/20/2024 $348,000 $28,485 $376,485 62.5% 10.0% 10.0% 8.2% 1.8% FR1-0011 VFD Replacements at Plant No. 1 ACS Engineering 12/15/2022 $1,214,888 $0 $1,214,888 19.6% 10.0% 10.0% 0.0% 10.0% FR1-0020 Traffic Signal Installation at Ellis Avenue and Mt. Langley Street Intersection Asplundh Construction LLC 10/04/2024 $746,250 $0 $746,250 0.0% 10.0% 10.0% 0.0% 10.0% FR2-0023 Activated Sludge Clarifier Entry Improvements at Plant No. 2 Tharsos, Inc. 03/21/2024 $1,171,000 $0 $1,171,000 86.7% 10.0% 10.0% 0.0% 10.0% FR2-0026 Headworks Phase 3 Cable Replacement at Plant No. 2 ACS Engineering 02/22/2023 $575,360 $12,846 $588,206 50.8% 20.0% 20.0% 2.2% 17.8% FR2-0032 Digester K Dome Repair at Plant No. 2 Structural Preservation Systems, LLC 11/20/2024 $876,707 $0 $876,707 0.0% 15.0% 15.0% 0.0% 15.0% FR2-0033 Digesters O - T Bridge Repair at Plant No. 2 Jamison Engineering 03/20/2025 $255,962 $0 $255,962 0.0% 10.0% 10.0% 0.0% 10.0% FRC-0010 Warner Avenue Vault Cover Improvements Minako America Corporation 09/17/2024 $977,000 $0 $977,000 0.0% 10.0% 10.0% 0.0% 0.0% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 17 Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining J-117B Outfall Low Flow Pump Station Shimmick Construction 12/19/2018 $90,200,000 $5,746,639 $95,946,639 93.8% 8.0% 8.0% 6.4% 1.6% J-120 Plant Water Pipeline Replacement in Kinnison, Lindstrom and Scott Tunnels at Plant No. 2 ABB, Inc 07/28/2021 $11,803,801 $26,644 $11,830,445 62.0% 10.0% 10.0% 0.10% 9.90% J-120A.1 Control Room Reconfiguration at Plant No.1 ABB, Inc 10/28/2024 $356,622 $0 $356,622 0.0% 10.0% 10.0% 0.0% 0.0% J-135B Engine and Generator Overhauls at Plant No. 1 and 2 Cooper Machinery Services 07/27/2022 $29,361,029 $3,644,111 $33,005,140 72.6% 10.0% 18.0% 12.4% 5.6% P1-105 Headworks Rehabilitation at Plant 1 Kiewit Infrastructure West Co. 03/24/2021 $222,330,000 $4,521,064 $226,851,064 64.8% 4.0% 8.0% 2.0% 6.0% P1-128A Headquarters Complex at Plant No. 1 Swinerton Builders 05/26/2021 $102,544,973 $4,917,352 $107,462,325 100% 5.0% 6.5% 4.8% 1.7% P1-128A.1 Headquarters Complex at Plant No. 1 EIDIM Group, Inc. 09/20/2023 $1,580,000 $66,150 $1,646,150 97.8% 10.0% 10.0% 4.2% 5.8% P1-132 Uninterruptable Power Supply Improvements at Plant 1 Leed Electric 12/15/2022 $5,765,789 ($3,381) $5,762,408 67.4% 10.0% 10.0% -0.1% 10.1% P1-133 Primary Sedimentation Basins No. 6-31 Reliability Improvements at Plant No. 1 Shimmick Construction 02/23/2022 $6,275,000 $181,874 $6,456,874 96.4% 10.0% 10.0% 2.9% 7.1% P1-134 South Perimeter Security and Utility Improvements at Plant No.1 Tovey-Shultz Construction, Inc. 07/28/2021 $4,396,779 $405,201 $4,801,980 97.7% 10.0% 10.0% 9.2% 0.8% P2-127 Collections Yard Relocation and Warehouse Demolition at Plant No. 2 Archico Design Build, Inc. 09/19/2023 $6,500,000 $201,890 $6,701,890 88.4% 10.0% 10.0% 3.1% 6.9% P2-128A South Perimeter Wall and Soil Improvements at Plant No. 2 Ames Construction, Inc. 03/27/2025 $25,270,000 $0 $25,270,000 1.5% 10.0% 10.0% 0.0% 10.0% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 18 Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining P2-137A Digester P and R Dome Tendon Repair Structural Preservation Systems, LLC 09/18/2024 $2,597,864 $0 $2,597,864 3.8% 10.0% 10.0% 0.0% 10.0% P2-98A A-Side Primary Clarifiers Replacement at Plant 2 PCL CONSTRUCTI ON INC. 05/26/2021 $111,405,880 $2,479,434 $113,885,314 54.0% 6.0% 6.0% 2.2% 3.8% SC19-06 EPSA Standby Power Generator Control Upgrades at Plant No. 2 Shimmick Construction 10/17/2023 $3,500,000 $18,230 $3,518,230 46.5% 10.0% 10.0% 0.5% 9.5% SC22-01 EPSA Electrical Building and Distribution Center H HVAC System Replacement at Plant No. 2 Trane U.S. Inc. 06/28/2023 $3,862,000 $0 $3,862,000 35.7% 10.0% 10.0% 0.0% 10.0% SC22-02 HVAC Replacement for Plant 2 Centrifuge Building, Operations Building, and Bitter Point PS Trane U.S. Inc. 02/26/2025 $2,746,477 $0 $2,746,477 0.0% 10.0% 10.0% 0.0% 10.0% Total $983,868,181 $23,197,838 $1,007,066,019 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 19 Table 2 - Active Operations Committee Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining No Committee-Awarded Construction Contracts this quarter Table 3 - Active GM Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining FE21-04 Thickening and Dewatering Facility Handrail Installation at Plant No. 1 J.R. Filanc Construction Company, Inc. 07/30/2024 $110,400 $0 $110,400 0.0% 10.0% 10.0% 0.0% 10.0% FR2-0026R Headworks Phase 3 Cable Replacement at Plant No. 2 Big Sky Electric 03/18/2025 $358,360 $0 $358,360 0.0% 0.0% 0.0% 0.0% 0.0% Total $468,760 $0 $468,760 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 20 Table 4 - Closed Board-Awarded Construction Contracts Project/Contract Contractor Award Date Closed Date Contract Amount Contingency Award Change Orders Final Original Final Unused 5-68 Newport Beach Pump Station Pressurization Improvements Innovative Construction Solutions 04/25/2023 03/11/2025 $937,500 $97,756 $1,035,256 10.0% 17.0% 6.6% FE20-03 Return Activated Sludge Discharge Piping Replacement at Activated Sludge Plant No. 1 GSE Construction Company, Inc. 12/15/2022 01/14/2025 $3,985,400 $44,613 $4,030,013 10.0% 10.0% 8.9% FR2-0027 Heavy Mechanics Group Office Space Upgrade at Plant No. 2 MBE Construction 02/08/2024 01/28/2025 $195,676 ($146) $195,530 10.0% 10.0% 10.1% Total $5,118,576 $142,223 $5,260,799 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 21 Table 6 - Closed GM-Awarded Construction Contracts Project/Contract Contractor Award Date Closed Date Contract Amount Contingency Original Award Amount Change Orders Final Contract Amount Original Final Unused FR2-0025 Digester O- T and Q-R Bridge Repair at Plant No. 2 O’Connell Engineering & Construction, Inc. 01/14/2004 01/07/2025 $115,450 $38,000 $153,450 0% 32.91% 0.00% Total $115,450 $38,000 $153,450 0% 32.91% 0.00% Table 5 - Closed Committee -Awarded Construction Contracts Project/Contract Contractor Award Date Closed Date Contract Amount Contingency Original Award Amount Change Orders Final Contract Amount Original Final Unused No Committee-awarded construction contract closed this quarter Engineering Program Contract Performance Report For the Period Ending March 31, 2025 22 Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining 11-33 Edinger Pump Station Replacement Arcadis U.S., Inc. PDSA 09/27/2023 $3,125,590 $35,180 $3,160,770 51% 10.0% 10.0% 1.1% 8.9% 1-23 Santa Ana Trunk Sewer Rehabilitation Stantec Consulting Services Inc. PDSA 04/27/2022 $3,880,000 $0 $3,880,000 83% 10.0% 10.0% 0.0% 10.0% 1-24 Greenville Trunk Improvements Brown and Caldwell PDSA 10/26/2022 $4,730,000 $0 $4,730,000 35% 10.0% 10.0% 0.0% 10.0% 2-49 Taft Branch Improvements Woodard & Curran, Inc. PCSA 07/23/2024 $1,108,033 $0 $1,108,033 17% 10.0% 10.0% 0.0% 10.0% 2-49 Taft Branch Improvements Woodard & Curran, Inc. PDSA 02/24/2021 $2,200,000 $147,062 $2,347,062 99% 10.0% 10.0% 6.7% 3.3% 3-60 Knott - Miller Holder Artesia Branch Rehabilitation Dudek PDSA 10/24/2023 $1,200,000 $0 $1,200,000 40% 10.0% 10.0% 0.0% 10.0% 3-64 Rehabilitation of Western Regional Sewers AECOM Technical Services, Inc. PDSA 01/27/2016 $17,639,250 $195,850 $17,835,100 63% 10.0% 10.0% 1.1% 8.9% 3-64B Los Alamitos Trunk Sewer Rehabilitation AECOM Technical Services, Inc. PCSA 05/26/2021 $610,000 $0 $610,000 86% 10.0% 10.0% 0.0% 10.0% 3-64C Los Alamitos Sub-Trunk and Westside Relief Interceptor Rehabilitation AECOM Technical Services, Inc. PCSA 02/04/2025 $1,576,696 $0 $1,576,696 0% 0.0% 10.0% 0.0% 10.0% 3-67 Seal Beach Pump Station Replacement Lee & Ro, Inc. PCSA 12/14/2023 $6,148,000 $0 $6,148,000 16% 10.0% 10.0% 0.0% 10.0% 5-67 Bay Bridge Pump Station Replacement Arcadis U.S., Inc. PCSA 03/10/2025 $12,143,580 $0 $12,143,580 0% 10.0% 10.0% 0.0% 10.0% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 23 Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining 5-67 Bay Bridge Pump Station Replacement Arcadis U.S., Inc. PDSA 10/25/2017 $7,137,000 $2,116,140 $9,253,140 91% 10.0% 35.0% 29.7% 5.3% 5-68 Newport Beach Pump Station Pressurization Improvements Dudek PCSA 02/01/2023 $124,979 $0 $124,979 49% 10.0% 10.0% 0.0% 10.0% 6-20 Fairview Sewer Rehabilitation Dudek PDSA 07/27/2022 $1,200,000 $0 $1,200,000 67% 10.0% 10.0% 0.0% 10.0% 7-65 Gisler-Red Hill Interceptor and Baker Force Main Rehabilitation CDM Smith Inc. PCSA 05/24/2023 $988,460 $98,846 $1,087,306 59% 10.0% 10.0% 10.0% 0.0% 7-68 MacArthur Force Main Improvements Michael Baker International , Inc. PCSA 09/11/2023 $272,002 $0 $272,002 52% 10.0% 10.0% 0.0% 10.0% 7-68 MacArthur Force Main Improvements Michael Baker International, Inc. PDSA 05/26/2021 $500,000 $0 $500,000 100% 10.0% 10.0% 0.0% 10.0% FR1-0007 Control Center Offices and Day Training Room Remodeling at Plant No. 1 AECOM Technical Services, Inc. PSA 07/24/2017 $48,000 $33,351 $81,351 11% 69.5% -69.5% J-117B Outfall Low Flow Pump Station SEL Engineering Services Inc. PSA 03/27/2019 $1,096,074 $0 $1,096,074 61% 10.0% 10.0% 0.0% 10.0% J-117B Outfall Low Flow Pump Station Brown and Caldwell PCSA 12/19/2018 $8,563,913 $1,584,324 $10,148,237 83% 10.0% 18.5% 18.5% 0.0% J-124 Digester Gas Facilities Rehabilitation Brown and Caldwell PDSA 11/15/2017 $11,770,000 $10,214,559 $21,984,559 67% 10.0% 89.9% 86.8% 3.1% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 24 Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining J-128 Project Management Information System PMWeb, Inc. PSA 06/27/2017 $1,022,500 $200,817 $1,223,317 86% 20.0% 20.0% 19.6% 0.4% J-133 Laboratory Replacement at Plant No. 1 Hazen and Sawyer PSA 02/06/2025 $6,777,839 $0 $6,777,839 0% 0.0% 0.0% J-137 Ocean Outfalls Rehabilitation Hazen and Sawyer PSA 11/05/2024 $7,941,723 $0 $7,941,723 0% 0.0% 0.0% J-98 Electrical Power Distribution System Improvements Schweitzer Engineering Laboratories, Inc PSA 03/25/2020 $1,296,878 $0 $1,296,878 36% 10.0% 10.0% 0.0% 10.0% J-98 Electrical Power Distribution System Improvements Brown and Caldwell PDSA 02/26/2020 $2,240,000 $223,806 $2,463,806 94% 10.0% 10.0% 10.0% 0.0% P1-105 Headworks Rehabilitation at Plant 1 SEL Engineering Services Inc. PSA 01/30/2024 $137,275 $0 $137,275 20% 10.0% 10.0% 0.0% 9.3% P1-105 Headworks Rehabilitation at Plant 1 Carollo Engineers, Inc PCSA 03/24/2021 $16,500,000 $0 $16,500,000 58% 10.0% 10.0% 0.0% 10.0% P1-126 Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1 Black & Veatch Corporation PDSA 04/27/2022 $14,163,000 $207,183 $14,370,183 57% 10.0% 10.0% 1.5% 8.5% P1-128A Headquarters Complex at Plant No. 1 HDR Engineering, Inc. PCSA 05/26/2021 $4,900,000 $726,720 $5,626,720 97% 10.0% 15.0% 14.8% 0.2% P1-128A Headquarters Complex at Plant No. 1 AECOM Technical Services, Inc. PSA 04/28/2021 $6,750,000 $299,107 $7,049,107 99% 10.0% 10.0% 4.4% 5.6% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 25 Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining P1-132 Uninterruptable Power Supply Improvements at Plant 1 Tetra Tech, Inc. PCSA 11/09/2023 $217,830 $0 $217,830 48% 10.0% 10.0% 0.0% 10.0% P1-132 Uninterruptable Power Supply Improvements at Plant 1 Tetra Tech, Inc. PDSA 11/20/2019 $784,630 $62,755 $847,385 100% 10.0% 10.0% 8.0% 2.0% P1-133 Primary Sedimentation Basins No. 6-31 Reliability Improvements at Plant No. 1 Carollo Engineers, Inc PCSA 03/23/2022 $530,000 $0 $530,000 63% 10.0% 10.0% 0.0% 10.0% P1-134 South Perimeter Security and Utility Improvements at Plant No.1 HDR Engineering, Inc. PCSA 07/28/2021 $235,000 $0 $235,000 58% 10.0% 10.0% 0.0% 10.0% P1-137 Support Buildings Seismic Improvements at Plant No. 1 Simpson, Gumpertz, and Heger PDSA 07/27/2022 $1,900,000 $151,537 $2,051,537 90% 10.0% 10.0% 8.0% 2.0% P1-140 Activated Sludge-1 Rehabilitation at Plant No. 1 HDR Engineering, Inc. PDSA 12/15/2022 $18,462,443 $0 $18,462,443 44% 10.0% 10.0% 0.0% 10.0% P2-123 Return Activated Sludge Piping Replacement at Plant 2 Spec Services, Inc. PCSA 09/25/2019 $252,329 $25,233 $277,562 100% 10.0% 10.0% 10.0% 0.0% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 26 Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining P2-124 Interim Food Waste Receiving Facility Kennedy/ Jenks Consultants, Inc. PDSA 09/26/2018 $695,000 $31,168 $726,168 100% 10.0% 10.0% 4.5% 5.5% P2-128 Digester Replacement at Plant No. 2 Brown and Caldwell PDSA 07/22/2020 $39,300,000 $9,602,657 $48,902,657 61% 10.0% 26.0% 24.4% 1.6% P2-128A South Perimeter Wall and Soil Improvements at Plant No. 2 Brown and Caldwell PCSA 11/20/2024 $2,043,717 $0 $2,043,717 1% 10.0% 10.0% 0.0% 0.0% P2-135 Chemical Systems Rehabilitation at Plant No. 2 Lee & Ro, Inc. PDSA 03/22/2023 $862,328 $86,220 $948,548 93% 10.0% 10.0% 10.0% 0.0% P2-136 Activated Sludge Aeration Basin Rehabilitation at Plant No. 2 Carollo Engineers, Inc PDSA 10/25/2023 $5,891,599 $180,630 $6,072,229 22% 10.0% 10.0% 3.1% 6.9% P2-137 Digesters Rehabilitation at Plant No. 2 CDM Smith Inc. PDSA 03/23/2022 $2,700,000 $1,290,938 $3,990,938 72% 10.0% 58.0% 47.8% 10.2% P2-137A Digester P and R Dome Tendon Repair CDM Smith Inc. PCSA 08/27/2024 $209,000 $0 $209,000 18% 10.0% 10.0% 0.0% 10.0% P2-138 Operations and Maintenance Complex at Plant No. 2. Stantec Architecture Inc. PDSA 01/25/2023 $7,914,529 $431,414 $8,345,943 33% 10.0% 42.0% 5.5% 36.5% P2-98A A-Side Primary Clarifiers Replacement at Plant 2 SEL Engineering Services Inc. PSA 05/23/2023 $97,399 $0 $97,399 0% 10.0% 10.0% 0.0% 0.0% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 27 Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining P2-98A A-Side Primary Clarifiers Replacement at Plant 2 Black & Veatch Corporation PCSA 05/26/2021 $8,400,000 $0 $8,400,000 59% 10.0% 10.0% 0.0% 10.0% PDB24-00 Progressive Design-Build Owner Advisor, Program management, and Professional Engineering Support Services Hazen and Sawyer PSA 11/05/2024 $19,340,000 $0 $19,340,000 0% 10.0% 10.0% 0.0% 0.0% PS20-02 Collection System Flow Level Monitoring Study Woodard & Curran, Inc. PSA 07/28/2021 $616,562 $0 $616,562 75% 10.0% 10.0% 0.0% 10.0% PS21-06 Urban Runoff Optimization Study Michael Baker International , Inc. PSA 03/22/2023 $711,230 $70,700 $781,930 85% 10.0% 10.0% 9.9% 0.1% PS21-07 Process Simulation Model Development for Cen Gen Facilities Intelliflux Controls PSA 02/05/2024 $150,308 $0 $150,308 22% 10.0% 10.0% 0.0% 10.0% PS23-04 Digital Asset Management Study Black & Veatch Corporation PSA 03/26/2025 $799,917 $0 $799,917 0% 10.0% 10.0% 0.0% 10.0% RE21-01 Supercritical Water Oxidation Demonstration at Plant No. 1 374Water Systems, Inc. PSA 12/15/2021 $5,139,000 $101,558 $5,240,558 42% 10.0% 10.0% 2.0% 8.0% Total $265,043,613 $28,117,755 $293,161,368 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 28 Table 8 - Active Task Orders by Master Agreement Agreement/Project Consultant Award Date Original Task Order Value Amendments Current Task Order Value % Spent 2018 Master Professional Design Service Agreements FE18-06 CenGen Instrument Air Compressors Replacement at Plant No. 1 IDS Group, Inc. 04/27/2020 $89,876 $0 $89,876 83% FE18-13 Redhill Relief Sewer Relocation at State Route 55 GHD, Inc. 03/27/2020 $168,612 $105,331 $273,943 95% FE19-02 Cengen Plant Water Pipe Replacement at Plant No. 1 AECOM Technical Services, Inc. 07/08/2020 $156,498 $143,378 $299,876 83% FE19-10 Digesters C, D, F, G and I Gas Balance Lines Replacement at Plant No. 2 GHD, Inc. 02/03/2021 $25,000 $65,749 $90,749 80% FE19-11 Primary Clarifiers Nos. 6-31 Lighting and Alarm Improvements at Plant No. 1 AECOM Technical Services, Inc. 09/21/2020 $226,685 $6,137 $232,822 75% FE19-13 VFD Replacements at Seal Beach Pump Station AECOM Technical Services, Inc. 03/24/2021 $78,033 $0 $78,033 60% FE20-01 Wastehauler Station Safety and Security Improvements AECOM Technical Services, Inc. 03/16/2021 $161,012 $16,247 $177,259 91% FE20-02 Digester C, D, F, and G Mechanical Rehabilitation at Plant No. 2 HDR Engineering, Inc. 03/02/2021 $188,212 $34,352 $222,564 95% FE20-03 Return Activated Sludge Discharge Piping Replacement at Activated Sludge Plant No. 1 GHD, Inc. 06/14/2021 $249,000 $0 $249,000 92% FE20-04 Cengen Cooling Water Pipe Replacement at Plant No. 2 Dudek 05/18/2021 $240,000 $130,000 $370,000 87% FE20-05 Plant Water Piping Replacement at Secondary Clarifiers 1- 26 at Plant No. 1 IDS Group, Inc. 06/22/2021 $186,626 $0 $186,626 88% FE20-08 Olive Sub-Trunk Siphon Rehabilitation at Santa Ana River Dudek 06/10/2021 $240,000 $0 $240,000 101% FE20-09 CenGen Smoke Detection Improvements at Plant No. 1 and No. 2 IDS Group, Inc. 06/15/2021 $63,275 $0 $63,275 83% FR1-0011 VFD Replacements at Plant No. 1 Black & Veatch Corporation 04/08/2021 $283,000 $17,000 $300,000 83% FRC-0009 Bitter Point Trunk Sewer Repair at Bitter Point Pump Station GHD, Inc. 06/17/2021 $159,451 $0 $159,451 83% Subtotal $2,515,280 $518,194 $3,033,474 Engineering Program Contract Performance Report For the Period Ending March 31, 2025 29 Table 8 - Active Task Orders by Master Agreement Agreement/Project Consultant Award Date Original Task Order Value Amendments Current Task Order Value % Spent 2020 Master Agreements for On-Call Planning Studies PS22-02 Onsite Oxygen Generation Feasibility Study at Plant No. 2 Black & Veatch Corporation 02/13/2023 $393,374 $17,718 $411,092 52% PS21-08 Pure Oxygen Activated Sludge Operations Study at Plant No. 2 Hazen and Sawyer 09/22/2022 $241,791 $55,413 $297,204 100% PS21-10 Integrated Nitrogen Management Hazen and Sawyer 10/19/2023 $247,000 $0 $247,000 20% PS20-09 Thickening & Dewatering Plant Water Study at Plant No. 1 HDR Engineering, Inc. 04/21/2022 $219,670 $0 $219,670 80% Subtotal $1,101,835 $73,131 $1,174,966 2021 Master Professional Design Service Agreements FR1-0023 Secondary Treatment Area Cable Replacement at Plant No. 1 Brown and Caldwell 06/28/2024 $338,943 $0 $338,943 32% FRC-0014 Magnolia Sewer Manhole Abandonment at Interstate-5 Brown and Caldwell 03/15/2023 $195,055 $0 $195,055 63% P1-142 Trickling Filter Media Replacement at Plant No. 1 Brown and Caldwell 05/21/2024 $397,030 $56,128 $453,158 34% FR1-0017 Trickling Filter Valve Replacement at Plant No. 1 Dudek 08/16/2022 $101,108 $0 $101,108 90% FR1-0018 Dewatering Centrifuge Diverter Gate Improvements at Plant No. 1 Dudek 08/16/2022 $140,000 $93,191 $233,191 97% FRC-0017 Valve Replacements and Wet Well Access Improvements at Slater Pump Station Dudek 06/14/2024 $281,000 $0 $281,000 49% FRJ-0003 Interplant Gas Line Blow Off Vault Repairs Dudek 09/08/2022 $165,000 $165,091 $330,091 59% FE21-08 Newhope-Placentia Sewer Manhole Replacements GHD, Inc. 02/28/2023 $235,820 $0 $235,820 90% FE22-01 Platform Modifications for Process Areas at Plant No. 1 and No. 2 ProjectLine Technical Services. Inc. 03/14/2023 $159,296 $0 $159,296 80% FR2-0023 Activated Sludge Clarifier Entry Improvements at Plant No. 2 AECOM Technical Services, Inc. 01/13/2022 $120,030 $79,828 $199,858 71% FR2-0027 Heavy Mechanics Group Office Space Upgrade at Plant No. 2 ProjectLine Technical Services. Inc. 09/13/2022 $126,153 $0 $126,153 100% FR2-0031 Activated Sludge System Scum Rerouting at Plant No. 2 GHD, Inc. 06/14/2024 $369,479 ($46,402) $323,077 35% FRC-0010 Warner Avenue Vault Cover Improvements Kleinfelder, Inc. 11/16/2021 $205,000 $43,128 $248,128 92% Engineering Program Contract Performance Report For the Period Ending March 31, 2025 30 Table 8 - Active Task Orders by Master Agreement Agreement/Project Consultant Award Date Original Task Order Value Amendments Current Task Order Value % Spent J-120A Control Room Reconfiguration at Plant No.1 ProjectLine Technical Services. Inc. 12/04/2023 $255,036 $27,672 $282,708 85% P2-127 Collections Yard Relocation and Warehouse Demolition at Plant No. 2 ProjectLine Technical Services. Inc. 08/02/2022 $188,898 $142,938 $331,836 95% SC19-06 EPSA Standby Power Generator Control Upgrades at Plant No. 2 Spec Services, Inc. 11/03/2021 $241,153 $58,847 $300,000 77% Subtotal $3,519,001 $620,421 $4,139,422 2024 Master Professional Design Service Agreements FRC-0020 College Pump Station Wet Well Rehabilitation HDR Engineering, Inc. 01/28/2025 $325,715 $0 $325,715 0% Subtotal $325,715 $0 $325,715 2024 On-Call Planning Studies PS23-01 Fleet Facilities Improvements Study Stantec Consulting Services Inc. 09/10/2024 $243,543 $0 $243,543 56% PS23-03 2025 Outfall Initial Dilution Model Hazen and Sawyer 07/16/2024 $425,232 $0 $425,232 83% PS23-06 Seismic Resilience Study at Plant No. 2 Brown and Caldwell 10/22/2024 $488,959 $0 $488,959 14% PS24-02 Bioscrubber Fan and Transformer Failure Root Cause Analysis Study Hazen and Sawyer 01/28/2025 $92,116 $0 $92,116 5% Subtotal $1,249,850 $0 $1,249,850 Total $8,385,966 $1,211,746 $9,597,712 Table 9 - Planning Studies Status Report Project Number Project Name Status Allocated Budget PS19-03 Laboratory Rehabilitation Feasibility Study Active $450,000 PS20-02 Collection System Flow Level Monitoring Study Active $743,218 PS20-08 Euclid Trunk Sewer Hydraulic Modeling and Odor Control Analyses Active $500,000 PS20-09 Thickening & Dewatering Plant Water Study at Plant No. 1 Active $400,000 PS21-01 Exterior Lighting Study at Plant Nos. 1 and 2 Active $345,533 PS21-02 Public Announcement and Fire System at Plant Nos. 1 and 2 Active $500,000 PS21-04 Energy and Digester Gas Master Plan Active $1,785,000 PS21-05 CAD Design Manual Update for 3D Design Active $758,000 PS21-06 Urban Runoff Optimization Study Active $1,100,000 PS21-07 Process Simulation Model Development for Cen Gen Facilities Active $211,192 PS21-10 Integrated Nitrogen Management Active $372,000 PS22-02 Onsite Oxygen Generation Feasibility Study at Plant No. 2 Active $295,000 PS23-01 Fleet Facilities Improvements Study Active $350,000 PS23-03 2025 Outfall Initial Dilution Model Active $708,000 PS23-04 Digital Asset Management Study Active $630,000 PS23-05 Utility Water Planning Study at Plant Nos. 1 and 2 Active $1,100,000 PS23-06 Seismic Resilience Study at Plant No. 2 Active $946,000 PS24-01 Deep Well Injection Feasibility Study Active $450,000 Grand Total $11,643,943 Number of Chartered Projects 18 Board Approved Program Budget $25,000,000 Remaining Unallocated Budget $13,356,057 Table 10 - Research Program Status Report Project Number Project Name Status Allocated Budget RE20-06 Co-Thickened Sludge Pump Trial at Plant No. 1 Active $160,000 RE21-01 Supercritical Water Oxidation Demonstration at Plant No. 1 Active $7,941,029 Grand Total $8,101,029 Number of Chartered Projects 2 Board Approved Program Budget $10,000,000 Remaining Unallocated Budget $1,898,971 Table 11 - Small Construction Projects Program Status Report Project Number Project Name Status Allocated Budget FE18-06 CenGen Instrument Air Compressors Replacement at Plant No. 1 Active $1,150,000 FE18-13 Redhill Relief Sewer Relocation at State Route 55 Active $4,100,000 FE18-14 Plant Water Pipeline Replacement in Kinnison, Lindstrom, and Scott Tunnels at Plant No. 2 Active $2,300,000 FE19-01 Pump Station Portable Generator Connectors Active $2,570,000 FE19-02 Cengen Plant Water Pipe Replacement at Plant No. 1 Active $5,725,000 FE19-03 Trickling Filter Sludge and Scum Pumps Replacement at Plant No. 1 Active $3,200,000 FE19-04 Sunflower Pump Replacement at Plant No. 1 Active $4,300,000 FE19-06 EPSA Motor Cooling Improvements at Plant No. 2 Active $1,825,000 FE19-08 Secondary Treatment VFD Replacements at Plant No. 2 Active $2,900,000 FE19-10 Digesters C, D, F, G and I Gas Balance Lines Replacement at Plant No. 2 Active $176,000 FE19-11 Primary Clarifiers Nos. 6-31 Lighting and Alarm Improvements at Plant No. 1 Active $1,250,000 FE20-01 Wastehauler Station Safety and Security Improvements Active $2,923,000 FE20-02 Digester C, D, F, and G Mechanical Rehabilitation at Plant No. 2 Active $6,622,000 FE20-03 Return Activated Sludge Discharge Piping Replacement at Activated Sludge Plant No. 1 Active $6,840,000 FE20-04 Cengen Cooling Water Pipe Replacement at Plant No. 2 Active $5,180,000 FE20-05 Plant Water Piping Replacement at Secondary Clarifiers 1-26 at Plant No. 1 Active $2,485,000 FE20-08 Olive Sub-Trunk Siphon Rehabilitation at Santa Ana River Active $3,500,000 FE20-09 CenGen Smoke Detection Improvements at Plant No. 1 and No. 2 Active $950,000 FE21-01 Plasma Cutting Fume Extractor installation at Plant No. 1 Rebuild Shop Active $400,700 FE21-04 Thickening and Dewatering Facility Handrail Installation at Plant No. 1 Active $510,000 FE21-06 Chemical Dosing Station Installation at Westside Pump Station Active $560,000 FE21-07 Liquid Oxygen Tank A Replacement at Plant No. 2 Active $3,800,000 FE21-08 Newhope-Placentia Sewer Manhole Replacements Active $1,225,000 FE22-01 Platform Modifications for Process Areas at Plant No. 1 and No. 2 Active $1,300,000 FE22-02 Liquid Oxygen Tank B Replacement at Plant No. 2 Active $4,200,000 FE23-01 Digester Gas Compressor Dryer Replacements at Plant Nos. 1 and 2 Active $8,000,000 FE23-03 Wetwell Level Monitoring Upgrade at Collections Pump Stations Active $4,005,000 FE23-04 Truck Loading Scale Replacement at Plant No. 2 Active $916,000 FE23-05 Primary Clarifier Nos. 6-31 Scum Pump Replacement at Plant No. 1 Active $3,789,000 FE23-06 HVAC Replacements at Plant Nos. 1 and 2 Active $2,840,000 FE23-07 Pipeline Utility Easement Clean Up in Huntington Beach Active $4,500,000 FE23-08 Power Buildings 7 and 8 HVAC Replacement at Plant No. 1 Active $850,000 FE23-09 Primary Clarifiers F and G Rotating Mechanism Rehabilitation at Plant No. 2 Active $4,360,000 FE24-02 Gas Compressor Building Heat Exchanger Replacement at Plant No. 1 Active $640,000 Table 11 - Small Construction Projects Program Status Report Project Number Project Name Status Allocated Budget SC19-03 Return Activated Sludge Pump Station Elevator Rehabilitation at Plant No. 2 Active $890,000 SC19-06 EPSA Standby Power Generator Control Upgrades at Plant No. 2 Active $4,800,000 SC20-02 Ocean Outfall Booster Station Elevator Rehabilitation Active $410,000 SC22-01 EPSA Electrical Building and Distribution Center H HVAC System Replacement at Plant No. 2 Active $5,100,000 SC22-02 HVAC Replacement for Plant 2 Centrifuge Buillding, Operations Building, and Bitter Point PS Active $3,712,000 SC23-01 Electric Vehicle Charging Stations and Network Installation Active $391,000 SC23-02 Effluent Junction Box Security Fence Replacement at Plant No. 1 Active $130,000 SC23-03 Collection System Critical Assets Active $145,000 Grand Total $115,469,70 0 Number of Chartered Projects 42 Board Approved Program Budget $125,000,000 Remaining Unallocated Budget $9,530,300 Table 12 - Information Technology Capital Program Status Report Project Number Project Name Status Allocated Budget IT19-05 IT P1 & P2 Data Refresh (IT19-05)Active $1,200,000 IT20-05 Client Management Modernization (ICE-69_IT20-05) 6520005 Active $99,000 IT20-08 Field Computer for Nerissa and Interface with LIMS(ICE-68_IT20-07) 6520008 Active $121,000 IT20-10 Digitize Quality Assurance Tracking Processes/TNI/ELAP Standards (ICE-76_IT20-10) 6520010 Active $145,700 IT21-04 Databridge Scale Management Software (ICE - 84_IT21-04)Active $42,752 IT23-03 Workforce Timecard Migration (ICE-98_IT23-03)Active $314,403 IT23-04 Evacuation Mustering & Visitor Management System (ICE -99_IT23-04)Active $176,000 IT24-01 ServiceNow Employee Center Intranet Portal Migrations (ICE - 101_IT24-01)Active $148,467 Grand Total $2,247,322 Number of Chartered Projects 8 Board Approved Program Budget $10,000,000 Remaining Unallocated Budget $7,752,678 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 1 DATE: March 05, 2025 TO: Orange County Sanitation District Board of Directors FROM: Rob Thompson, General Manager Through: Mike Dorman, Director of Engineering This report summarizes the status, activities, and performance of construction contracts and consultant agreements. This report also identifies the names and status of projects being performed under master budgets for planning studies, research , small construction projects, Operations & Maintenance capital projects and information technology projects. As of December 31, 2024, Orange County Sanitation District (OC San) Engineering Department manages 154 active projects, with project budgeting totaling close to $4 billion. These projects are in various project phases, ranging from Project Development to Closeout. The graphic below shows the number of projects in each of the project phases. This report is organized into six parts, as follows. Detailed tables can be found in the appendix section of the report. Part 1 – Construction Contracts ..................................................................................................... 2 Part 2 – Engineering Professional Services Agreements .............................................................. 4 Part 3 – Master Budget Projects..................................................................................................... 6 Part 4 – Supplemental Engineering Services Contract .................................................................. 7 Part 5 – Programming Professional Services Contract.................................................................. 9 Part 6 – On-Call Services Agreements ...................................................................................... 111 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 2 PART 1 – CONSTRUCTION CONTRACTS Construction Contracts As shown in the graph below, there are currently 51 active construction contracts totaling $884 million. The graph also categorizes the active construction contracts by project type (plant, collections, and other) with the “Other” category capturing research and small capital projects. Table 1 in the appendix lists the Board-awarded construction contracts while Tables 2 and 3 list the Operations Committee and General Manager awarded construction contracts, active as of December 31, 2024. The General Manager may award contracts up to $150,000 and task orders up to $500,000. The table below summarizes the number of active and closed construction contracts and total contract amounts. See Tables 4, 5 and 6 in the appendix for a list of the closed contracts. Type Contracts Total Contract Amount Active Board-Awarded Construction Contracts 48 $883,522,559 Active Ops Committee Awarded Construction Contracts 1 $195,530 Active GM Awarded Construction Contracts 2 $263,850 Closed Board-Awarded Construction Contracts 5 $8,562,621 Closed Committee-Awarded Construction Contracts 2 $347,549 Closed GM Awarded Construction Contracts 0 $0 Collection Projects 9 Contracts Plant Projects 42 Contracts $694 Million $190 Million 32 Unique Contractors Engineering Program Contract Performance Report For the Period Ending December 31, 2024 3 Cumulative Change Order Rates When the OC San Board of Directors awards a construction contract, they also approve a contingency which allows the General Manager to approve contract change orders up to the amount of the contingency. One purpose of this report is to document how much of the contingency is utilized. A contract’s change order rate is only meaningful when the work is completed. As such, this report's change order performance charts are based only on contracts closed since the Board began approving contingencies in 2008. The following chart shows how cumulative change order rates have changed for plant, collections, and all contracts over the past 15 years. Change Order Goals Project Type 15-Year Sliding Window Change Order Goal Plant – New 5% Plant – Rehab 8% Collections 10% Engineering Program Contract Performance Report For the Period Ending December 31, 2024 4 PART 2 – ENGINEERING PROFESSIONAL SERVICES AGREEMENTS Professional Design and Related Service Agreements OC San engages engineering consultants through Professional Service Agreements (PSAs), Professional Design Services Agreements (PDSAs), and Professional Construction Services Agreements (PCSAs). PDSAs are used to obtain design engineering services, and PCSAs are a subsequent agreement with the design consultant to provide support services during construction. PSAs are used for planning studies and other consultant assignments. There are currently 50 Professional Design and Related Service Agreements (26 individual firms) with total agreement amount of $233,456,511. Table 7 in the appendix provides a detailed list of Professional Design and Related Service Agreements. Master Agreements Master Agreements are issued to a pool of pre-qualified consultants for smaller projects. On those smaller projects, OC San solicits task order proposals from interested firms and awards a task order to the most qualified consultant. The Master Agreements are listed below. • 2017 Master Agreements for Planning Studies (expired) • 2018 Master Professional Design Services Agreements (expired) • 2020 Master Agreements for On -Call Planning Studies (expired) • 2021 Master Professional Design Services Agreements (expired) • 2024 Master Agreements for On -Call Planning Studies • 2024 Master Professional Design Service Agreements • Agreement for Design Installation, Implementation and Maintenance of a Process Control System Engineering Program Contract Performance Report For the Period Ending December 31, 2024 5 New task orders cannot be issued under expired agreements, but previously issued task orders remain active until completed. Task Orders are limited by OC San Ordinance No. OC SAN-61 to $500,000 per task order. Below is a summary of the various master agreements with active task orders. See Table 8 in the appendix for a detailed list of task orders. Task Order Contracts Total Contract Amount 2017 Master Agreements for Planning Studies 1 $274,888 2018 Master Professional Design Service Agreements 18 $3,562,073 2020 Master Agreements for On-Call Planning Studies 5 $1,198,791 2021 Master Professional Design Service Agreements 16 $4,126,708 2024 Master Agreements for On-Call Planning Studies 3 $1,157,734 2024 Master Professional Design Service Agreements 0 $0 Master Service Agreements Through a competitive procurement process, a Master Services Agreement (MSA) was awarded to ABB Inc. for the design, installation, implementation, and maintenance of a control system for a term of 15 years with renewals up to 25 years under Project SP-196, Process Control Systems Upgrades Study. Specific equipment and services will be procured under task orders associated with each CIP project and operating budget. Task Order Contracts Total Contract Amount Design Installation, Implementation and Maintenance of a Process Control System Master Agreement 2 $12,160,424 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 6 PART 3 – MASTER BUDGET PROJECTS The Board-adopted budget for Fiscal Years 2022-23 and 2023-24 includes master program budgets that allow staff to initiate, execute, and manage smaller projects that fit within the scope of a particular program more quickly. The projects chartered under these program budgets are referred to as sub-projects and are managed to the same standards as projects specifically listed in the adopted budget. A status table for each of these programs listing the sub-projects is attached in the appendix. These projects include Planning Studies (PS), Research (RE), Facility Engineering (FE), Maintenance (MP), and Small Capital (SC) and Information Technology (IT). Master Program Title Status Table Number of Projects Total Allocated Budget Planning Studies Program Table 9 18 $11,643,943 Research Program Table 10 2 $8,101,029 Small Construction Projects, Operations & Maintenance Capital Programs Table 11 42 $115,469,700 Information Technology Capital Program Table 12 8 $2,247,322 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 7 PART 4 – SUPPLEMENTAL ENGINEERING SERVICES CONTRACT In April of 2022, the OC San Board of Directors approved two Professional Service Agreements - one with AECOM Technical Services, Inc. and one with Jacobs Project Management Co. - to provide Supplemental Engineering Services for a three-year period commencing May 1, 2022, through April 30, 2025, with two one-year renewal options. The Board approved the agreements for an amount not to exceed $29,700,000 per individual agreement. The benefits of using a supplemental engineering services contract, as opposed to hiring full-time staff or limited-term employees, include rapid mobilization of highly skilled/technical staff, flexibility to change the mix of staff positions on an immediate and as-needed basis, the ability to reduce staff as workloads decrease, access to technical experts to support special tasks, and access to staff with wastewater project experience. Status tables for the supplemental engineering services contract and labor summary for the 2022 Supplemental Engineering Services Contract with AECOM and Jacobs Project Management Co. are included below. 2022 Supplemental Engineering Services Contract Status (AECOM) Total Fees Time Contract $29,700,000 60 Months(1) Actuals to Date $3,345,637 11% 32 Months 53% Remaining $26,354,363 89% 28 Months 47% (1) Assuming two additional 1-year extensions 2022 Supplemental Engineering Services Labor Summary (AECOM) This Quarter Inception to Date Labor Hours 4,008 18,576 Full Time Equivalents 8.91 3.87 Labor Costs (no expenses) $746,120 $3,275,192 Average Hourly Rate $186 $176 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 8 2022 Supplemental Engineering Services Contract Status (Jacobs) Total Fees Time Contract $29,700,000 60 Months(1) Actuals to Date $15,860,908 53% 32 Months 53% Remaining $13,83,092 47% 28 Months 47% (1) Assuming two additional 1-year extensions 2022 Supplemental Engineering Services Labor Summary (Jacobs) This Quarter Inception to Date Labor Hours 13,170 93,056 Full Time Equivalents 27 18 Labor Costs (no expenses) $2,323,447 $15,503,239 Average Hourly Rate $177 $176 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 9 PART 5 – PROGRAMMING PROFESSIONAL SERVICES CONTRACT In April of 2022, the OC San Board of Directors approved two Professional Service Agreements - one with Enterprise Automation and one with Rockwell Automation, Inc. (formerly Maverick Technologies) - to provide Programming Professional Services for a three-year period commencing May 11, 2022, through May 10, 2025, with two one-year renewal options. The Board approved the agreements for an amount not to exceed $4,900,000 per individual agreement. The programming professional services will program, test, commission, maintain, upgrade, and configure programmable logic controllers, HMI graphics, databases, servers, and networks for select projects. The benefits of using a programming professional services contract, as opposed to hiring full-time staff or limited-term employees, include the ability to provide the needed short-term resources during the execution of Project No. J-120, Process Control Systems Upgrades, rapid mobilization of highly skilled technical resources, flexibility to change the mix of needed resources to match project requirements, and the ability to increase or reduce project resources as workloads change. Status tables for the programming professional services contract and labor summary for the 2022 Programming Professional Services Contract with Enterprise Automation and Rockwell Automation are included below. 2022 Programming Professional Services Contract Status (Enterprise Automation) Total Fees Time Contract $4,900,000 60 Months(1) Actuals to Date $1,860,002 38% 32 Months 53% Remaining $3,039,998 62% 28 Months 47% (1) Assuming two additional 1-year extensions 2022 Programming Professional Services Labor Summary (Enterprise Automation) This Quarter Inception to Date Labor Hours 35 9864 Full Time Equivalents 0.1 1.8 Labor Costs (no expenses) $7,563 $1,859,918 Average Hourly Rate $215 $189 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 10 2022 Programming Professional Services Contract Status (Rockwell Automation) Total Fees Time Contract $4,900,000 60 Months(1) Actuals to Date $1,547,241 32% 32 Months 53% Remaining $3,352,759 68% 28 Months 47% (1) Assuming two additional 1-year extensions 2022 Programming Professional Services Labor Summary (Rockwell Automation) This Quarter Inception to Date Labor Hours 488 8135 Full Time Equivalents 0.2 1.5 Labor Costs (no expenses) $100,748 $1,547,241 Average Hourly Rate $206 $190 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 11 PART 6 – ON-CALL SERVICES AGREEMENTS OC San uses three sets of on-call services agreements for coating inspection and corrosion testing; materials testing, inspection, and other geotechnical testing; and surveying. Services are typically requested by inspection supervisors as needs arise, and the work is generally spread among the available firms. The table below lists the contract limits and funds expended to date for each of the agreements which became effective on March 23, 2022, and will expire on April 30, 2025. For each of these services, OC San typically uses a single firm for a particular construction contract. Consultant Contract Limit Total Costs Incurred Remaining Coating Inspection Services (PSA2022-001) CSI Services, Inc. $300,000 $38,492 $261,509 Diversified Project Services Int'l (DPSI) $300,000 $222,404 $77,596 Geotechnical Testing Services (PSA2022-003) AESCO $400,000 $314,402 $85,598 Atlas Technical Consultants $400,000 $285,905 $114,095 Koury Engineering and testing, Inc. $400,000 $195,858 $204,142 MTGL, Inc $400,000 $229,622 $170,378 Surveying Services (PSA2022-002) D.Woolley & Associates $200,000 $47,01 $152,909 Michael Baker International, Inc. $200,000 $32,239 $167,762 Psomas $200,000 $63,147 $136,853 Stantec Consulting Services, Inc. $200,000 $45,435 $154,565 OC San uses an on-call corrosion engineering service agreement to perform condition assessments and an on-call corrosion engineering support agreement to support condition assessment and provide confined space entry support. Engineering Program Contract Performance Report For the Period Ending December 31, 2024 12 The table below list the contract limits and funds expended to date for each of the agreements. The Corrosion Management Support Services is a one-year agreement with four one-year renewal options that became effective on February 1, 2020. The Condition Assessment On-Call Contractor Support Services is a one-year agreement with four one- year renewal options that became effective on November 1, 2021. Consultant Contract Limit Total Costs Incurred Remaining Corrosion Management Support Services Corrpro Companies Inc $600,000 $420,304 $179,696 Condition Assessment On-Call Contractor Support Services Jamison Engineering Contractors, Inc $783,470 $139,240 $493,055 Engineering Program Contract Performance Report For the Period Ending December 31, 2024 13 APPENDIX Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current Spent % Original Current Used Remaining 2-49 Taft Branch Improvements Big Ben Inc. 05/22/2024 $20,458,250 $0 $20,458,250 3.4% 10.0% 10.0% 0.0% 10.0% 3-64B Los Alamitos Trunk Sewer Rehabilitation Steve P. Rados, Inc. 05/26/2021 $17,775,000 $357,119 $18,132,119 91.5% 10.0% 10.0% 2.0% 8.0% 3-67 Seal Beach Pump Station Replacement Walsh Construction Company II, LLC 12/14/2023 $97,032,743 ($14,375) $97,018,368 6.7% 10.0% 10.0% 0.0% 10.0% 5-68 Newport Beach Pump Station Pressurization Improvements Innovative Construction Solutions 04/25/2023 $937,500 $97,756 $1,035,256 100.0% 10.0% 17.0% 10.4% 6.6% 7-65 Gisler-Red Hill Interceptor and Baker Force Main Rehabilitation Steve P. Rados, Inc. 05/24/2023 $44,706,000 ($1,067,300) $43,638,700 47.6% 10.0% 10.0% -2.4% 12.4% 7-68 MacArthur Force Main Improvements SRK Engineering, Inc. 10/20/2023 $3,897,000 $0 $3,897,000 84.3% 10.0% 10.0% 0.0% 10.0% FE18-13 Redhill Relief Sewer Relocation at State Route 55 SRK Engineering, Inc. 06/22/2022 $2,213,000 $457,620 $2,670,620 13.8% 15.0% 36.0% 20.7% 15.3% FE19-01 Pump Station Portable Generator Connectors Pacific Industrial Electric 09/29/2021 $1,207,479 $68,343 $1,275,822 99.5% 10.0% 16.0% 5.7% 10.3% FE19-02 Cengen Plant Water Pipe Replacement at Plant No. 1 Innovative Construction Solutions 05/14/2024 $3,385,000 $0 $3,385,000 0.0% 10.0% 10.0% 0.0% 10.0% FE19-03 Trickling Filter Sludge and Scum Pumps Replacement at Plant No. 1 Garney Pacific, Inc. 02/23/2022 $778,000 $23,471 $801,471 91.0% 10.0% 10.0% 3.0% 7.0% Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current Spent % Original Current Used Remaining FE19-04 Sunflower Pump Replacement at Plant No. 1 GSE Construction Company, Inc. 10/27/2021 $2,123,200 $162,055 $2,285,255 83.9% 10.0% 25.0% 7.6% 17.4% FE19-08 Secondary Treatment VFD Replacements at Plant No. 2 ACS Engineering 03/23/2022 $1,433,000 $0 $1,433,000 6.7% 10.0% 10.0% 0.0% 10.0% FE20-02 Digester C, D, F, and G Mechanical Rehabilitation at Plant No. 2 J.F. Shea Construction, Inc. 08/13/2024 $3,694,000 $0 $3,694,000 0.0% 10.0% 10.0% 0.0% 10.0% FE20-03 Return Activated Sludge Discharge Piping Replacement at Activated Sludge Plant No. 1 GSE Construction Company, Inc. 12/15/2022 $3,985,400 $0 $3,985,400 98.0% 10.0% 10.0% 0.0% 10.0% FE20-04 Cengen Cooling Water Pipe Replacement at Plant No. 2 Innovative Construction Solutions 11/16/2022 $3,487,600 $0 $3,487,600 41.7% 10.0% 10.0% 0.0% 10.0% FE20-05 Plant Water Piping Replacement at Secondary Clarifiers 1-26 at Plant No. 1 T.E. Roberts, Inc. 12/05/2024 $1,375,313 $0 $1,375,313 0.0% 10.0% 10.0% 0.0% 10.0% FE20-08 Olive Sub-Trunk Siphon Rehabilitation at Santa Ana River MMC, Inc. 04/26/2023 $1,944,000 $0 $1,944,000 65.6% 10.0% 10.0% 0.0% 10.0% FE21-07 Liquid Oxygen Tank A Replacement at Plant No. 2 J.R. Filanc Construction Company, Inc. 01/18/2023 $2,608,007 $0 $2,608,007 36.6% 10.0% 10.0% 0.0% 10.0% FE22-01 Platform Modifications for Process Areas at Tharsos, Inc. 12/18/2024 $494,494 $0 $494,494 0.0% 15.0% 15.0% 0.0% 15.0% Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current Spent % Original Current Used Remaining Plant No. 1 and No. 2 FE22-02 Liquid Oxygen Tank B Replacement at Plant No. 2 J.R. Filanc Construction Company, Inc. 07/01/2024 $3,098,000 $0 $3,098,000 1.4% 10.0% 10.0% 0.0% 10.0% FE23-01 Digester Gas Compressor Dryer Replacements at Plant Nos. 1 and 2 Innovative Construction Solutions 09/10/2024 $5,942,500 $0 $5,942,500 0.0% 10.0% 10.0% 0.0% 10.0% FE23-06 HVAC Replacements at Plant Nos. 1 and 2 ACCO Engineered Systems 07/24/2024 $1,698,204 $0 $1,698,204 0.0% 10.0% 10.0% 0.0% 0.0% FE23-08 Power Buildings 7 and 8 HVAC Replacement at Plant No. 1 Trane U.S. Inc. 10/02/2024 $687,708 $0 $687,708 0.0% 5.0% 5.0% 0.0% 5.0% FE23-09 Primary Clarifiers F and G Rotating Mechanism Rehabilitation at Plant No. 2 Vicon Enterprise 11/15/2024 $3,150,000 $0 $3,150,000 5.0% 15.0% 15.0% 0.0% 15.0% FR1-0005 Cengen and 12Kv Service Center Switchgear Battery System Upgrades at Plant No. 1 Mass Electric Construction Co. 11/27/2023 $970,000 $21,052 $991,052 63.0% 10.0% 20.0% 2.2% 17.8% FR1- 0007R Control Center Offices and Day Training Room Remodeling at Plant 1 A2Z Construct Inc. 02/20/2024 $348,000 $0 $348,000 67.6% 0.0% 10.0% 0.0% 10.0% Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current Spent % Original Current Used Remaining FR1-0011 VFD Replacements at Plant No. 1 ACS Engineering 12/15/2022 $1,214,888 $0 $1,214,888 19.6% 10.2% 10.2% 0.0% 10.2% FR1-0016 Waste Sidestream Pump Station VFD replacements at Plant No.1 Leed Electric 03/23/2022 $344,889 $23,764 $368,653 100.0% 15.0% 15.0% 6.9% 8.1% FR1-0020 Traffic Signal Installation at Ellis Avenue and Mt. Langley Street Intersection Asplundh Construction LLC 10/04/2024 $746,250 $0 $746,250 0.0% 10.0% 10.0% 0.0% 10.0% FR2-0023 Activated Sludge Clarifier Entry Improvements at Plant No. 2 Tharsos, Inc. 03/21/2024 $1,171,000 $0 $1,171,000 84.4% 10.0% 10.0% 0.0% 10.0% FR2-0026 Headworks Phase 3 Cable Replacement at Plant No. 2 ACS Engineering 02/22/2023 $575,360 $12,846 $588,206 50.8% 20.0% 20.0% 2.2% 17.8% FR2-0032 Digester K Dome Repair at Plant No. 2 Structural Preservation Systems, LLC 11/20/2024 $876,707 $0 $876,707 0.0% 15.0% 15.0% 0.0% 15.0% FRC-0010 Warner Avenue Vault Cover Improvements Minako America Corporation 09/17/2024 $977,000 $0 $977,000 0.0% 0.0% 0.0% J-117B Outfall Low Flow Pump Station Shimmick Construction 12/19/2018 $90,200,000 $5,551,595 $95,751,595 93.4% 8.0% 8.0% 6.2% 1.8% J-120 Process Control Systems Upgrades ABB, Inc. 07/28/2021 $11,818,480 ($14,679) $11,803,801 58.9% 10.0% 10.0% -0.1% 10.1% J-135B Engine and Generator Overhauls at Plant No. 1 and 2 Cooper Machinery Services 07/27/2022 $29,361,029 $3,436,717 $32,797,746 69.0% 10.0% 18.0% 11.7% 6.3% Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current Spent % Original Current Used Remaining P1-105 Headworks Rehabilitation at Plant 1 Kiewit Infrastructure West Co. 03/24/2021 $222,330,000 $3,693,834 $226,023,834 62.8% 4.0% 4.0% 1.7% 2.3% P1-128A Headquarters Complex at Plant No. 1 Swinerton Builders 05/26/2021 $102,544,973 $4,917,352 $107,462,325 104.2% 5.0% 6.5% 4.8% 1.7% P1-128A.1 Headquarters Complex at Plant No. 1 EIDIM Group, Inc. 09/20/2023 $1,580,000 $66,150 $1,646,150 97.8% 10.0% 10.0% 4.2% 5.8% P1-132 Uninterruptable Power Supply Improvements at Plant 1 Leed Electric 12/15/2022 $5,765,789 ($3,381) $5,762,408 64.2% 10.0% 10.0% -0.1% 10.1% P1-133 Primary Sedimentation Basins No. 6-31 Reliability Improvements at Plant No. 1 Shimmick Construction 02/23/2022 $6,275,000 $85,749 $6,360,749 96.8% 10.0% 10.0% 1.4% 8.6% P1-134 South Perimeter Security and Utility Improvements at Plant No.1 Tovey-Shultz Construction, Inc. 07/28/2021 $4,396,779 $405,201 $4,801,980 97.7% 10.0% 10.0% 9.2% 0.8% P2-127 Collections Yard Relocation and Warehouse Demolition at Plant No. 2 Archico Design Build, Inc. 09/19/2023 $6,500,000 $74,106 $6,574,106 90.1% 10.0% 10.0% 1.1% 8.9% P2-128A South Perimeter Wall and Soil Improvements at Plant No. 2 Ames Construction, Inc. 11/20/2024 $25,270,000 $0 $25,270,000 0.0% 10.0% 10.0% 0.0% 10.0% P2-137A Digester P and R Dome Tendon Repair Structural Preservation Systems, LLC 09/18/2024 $2,597,864 $0 $2,597,864 0.0% 10.0% 10.0% 0.0% 10.0% P2-98A A-Side Primary Clarifiers PCL CONSTRUC TION INC. 05/26/2021 $111,405,880 $2,406,048 $113,811,928 50.5% 6.0% 6.0% 2.2% 3.8% Table 1 - Active Board-Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current Spent % Original Current Used Remaining Replacement at Plant 2 SC19-06 EPSA Standby Power Generator Control Upgrades at Plant No. 2 Shimmick Construction 10/17/2023 $3,500,000 $18,230 $3,518,230 45.3% 10.0% 10.0% 0.5% 9.5% SC22-01 EPSA Electrical Building and Distribution Center H HVAC System Replacement at Plant No. 2 Trane U.S. Inc. 06/28/2023 $3,862,000 $0 $3,862,000 17.5% 10.0% 10.0% 0.0% 10.0% Total $862,743,286 $20,779,273 $883,522,559 Table 2 - Active Operations Committee Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining FR2-0027 Heavy Mechanics Group Office Space Upgrade at Plant No. 2 MBE Construction 02/08/2024 $195,676 ($146) $195,530 100.0% 10.0% 10.0% -0.1% 10.1% Total $195,676 ($146) $195,530 Table 3 - Active GM Awarded Construction Contracts Project/Contract Contractor Award Date Contract Amount Contingency Award Change Orders Current % Spent Original Current Used Remaining FE21-04 Thickening and Dewatering Facility Handrail Installation at Plant No. 1 J.R. Filanc Construction Company, Inc. 07/30/2024 $110,400 $0 $110,400 0.0% 10.0% 10.0% 0.0% 10.0% FR2-0025 Digester O-T and Q-R Bridge Repair at Plant No. 2 O'Connell Engineering & Construction, Inc. 03/14/2022 $115,450 $38,000 $153,450 90.7% 10.0% 32.9% 32.9% 0.0% Total $225,850 $38,000 $263,850 Table 4 - Closed Board-Awarded Construction Contracts Project/Contract Contractor Award Date Closed Date Contract Amount Contingency Award Change Orders Final Original Final Unused MP-307 Bushard Diversion Structure Repair Abhe - Svoboda, Inc 6/22/2022 10/9/2024 $1,762,545 ($25,000) $1,737,545 10.0% 10.0% 1.00% FR2-0018 Activated Sludge Clarifier Repairs at Plant No. 2 Garney Pacific, Inc. 7/27/2022 10/9/2024 $5,091,686 ($4,741) $5,086,945 10.0% 10% 10% FR1-0017 Trickling Filter Valve Replacement at Plant No 1 Vicon Enterprise 2/13/2024 10/9/2024 $257,300 $5,945 $263,245 10.0% 10% 7.69% FE20-09 CenGen Smoke Detection Improvements at Plant No. 1 and No. 2 ADT Commercial, LLC 12/15/2022 11/5/2024 $313,000 ($4,109) $308,891 10.0% 10.0% 10.0% FE18-14 Plant Water Pipeline Replacement in Kinnison, Lindstrom, and Scott Tunnels at Plant No. 2 MMC, Inc. 12/16/2020 12/3/2024 $1,134,000 $31,945 $1,165,995 15.0% 15.0% 14.62% Total $8,558,531 $37,890 $8,562,621 Table 5 - Closed Committee -Awarded Construction Contracts Project/Contract Contractor Award Date Closed Date Contract Amount Contingency Award Change Orders Final Original Final Unused FR2-0029 Influent Pump Station Plant Water Piping repair at Plant No. 2 W.A. Rasic Construction Company 06/07/2023 12/31/2024 $177,063 $25,314 $202,377 20.0% 20.0% 5.7% SC23-01 Electric Vehicle Charging Stations and Network Installation Chargie, LLC 11/14/2023 12/17/2024 $143,225 $1,947 $145,172 20.0% 20.0% 18.64% Total $320,288 $27,261 $347,549 Table 6 - Closed GM-Awarded Construction Contracts Project/Contract Contractor Award Date Closed Date Contract Amount Contingency Award Change Orders Final Original Final Unused No GM-awarded construction contract closed this quarter Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining 11-33 Edinger Pump Station Replacement Arcadis U.S., Inc. PDSA 09/27/2023 $3,125,590 $35,180 $3,160,770 40% 10.0% 10.0% 1.1% 8.9% 1-23 Santa Ana Trunk Sewer Rehabilitation Stantec Consulting Services Inc. PDSA 04/27/2022 $3,880,000 $0 $3,880,000 79% 10.0% 10.0% 0.0% 10.0% 1-24 Greenville Trunk Improvements Brown and Caldwell PDSA 10/26/2022 $4,730,000 $0 $4,730,000 35% 10.0% 10.0% 0.0% 10.0% 2-49 Taft Branch Improvements Woodard & Curran, Inc. PCSA 07/23/2024 $1,108,033 $0 $1,108,033 9% 10.0% 10.0% 0.0% 10.0% 2-49 Taft Branch Improvements Woodard & Curran, Inc. PDSA 02/24/2021 $2,200,000 $147,062 $2,347,062 99% 10.0% 10.0% 6.7% 3.3% 3-60 Knott - Miller Holder Artesia Branch Rehabilitation Dudek PDSA 10/24/2023 $1,200,000 $0 $1,200,000 35% 10.0% 10.0% 0.0% 10.0% 3-62 Westminster Blvd Force Main Replacement Stantec Consulting Services Inc. PCSA 12/18/2019 $1,183,000 ($400,000) $783,000 75% 10.0% 10.0% - 33.8% 43.8% 3-64 Rehabilitation of Western Regional Sewers AECOM Technical Services, Inc. PDSA 01/27/2016 $17,639,250 $195,850 $17,835,100 63% 10.0% 10.0% 1.1% 8.9% 3-64B Los Alamitos Trunk Sewer Rehabilitation AECOM Technical Services, Inc. PCSA 05/26/2021 $610,000 $0 $610,000 78% 10.0% 10.0% 0.0% 10.0% Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining 3-67 Seal Beach Pump Station Replacement Lee & Ro, Inc. PCSA 12/14/2023 $6,148,000 $0 $6,148,000 12% 10.0% 10.0% 0.0% 10.0% 7-66 Sunflower and Red Hill Interceptor Repairs GHD, Inc. PCSA 07/28/2021 $166,000 $0 $166,000 51% 10.0% 10.0% 0.0% 10.0% J-117B Outfall Low Flow Pump Station SEL Engineering Services Inc. PSA 03/27/2019 $1,096,074 $0 $1,096,074 61% 10.0% 10.0% 0.0% 10.0% J-117B Outfall Low Flow Pump Station Brown and Caldwell PCSA 12/19/2018 $8,563,913 $1,584,324 $10,148,237 82% 10.0% 18.5% 18.5% 0.0% J-124 Digester Gas Facilities Rehabilitation Brown and Caldwell PDSA 11/15/2017 $11,770,000 $9,760,000 $21,530,000 65% 10.0% 89.9% 82.9% 6.9% J-137 Ocean Outfalls Rehabilitation Hazen and Sawyer PSA 11/05/2024 $7,941,724 $0 $7,941,724 0% 0.0% 0.0% J-98 Electrical Power Distribution System Improvements Schweitzer Engineering Laboratories, Inc PSA 03/25/2020 $1,296,878 $0 $1,296,878 36% 10.0% 10.0% 0.0% 10.0% J-98 Electrical Power Distribution System Improvements Brown and Caldwell PDSA 02/26/2020 $2,240,000 $223,806 $2,463,806 94% 10.0% 10.0% 10.0% 0.0% P1-105 Headworks Rehabilitation at Plant 1 SEL Engineering Services Inc. PSA 01/30/2024 $137,275 $0 $137,275 20% 9.3% 9.3% 0.0% 9.3% P1-105 Headworks Rehabilitation at Plant 1 Carollo Engineers, Inc PCSA 03/24/2021 $16,500,000 $0 $16,500,000 54% 10.0% 10.0% 0.0% 10.0% P1-126 Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1 Black & Veatch Corporation PDSA 04/27/2022 $14,163,000 $207,183 $14,370,183 43% 10.0% 10.0% 1.5% 8.5% Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining P1-128A Headquarters Complex at Plant No. 1 HDR Engineering, Inc. PCSA 05/26/2021 $4,900,000 $726,720 $5,626,720 96% 10.0% 15.0% 14.8% 0.2% P1-128A Headquarters Complex at Plant No. 1 AECOM Technical Services, Inc. PSA 04/28/2021 $6,750,000 $299,107 $7,049,107 94% 10.0% 10.0% 4.4% 5.6% P1-132 Uninterruptable Power Supply Improvements at Plant 1 Tetra Tech, Inc. PCSA 11/09/2023 $217,830 $0 $217,830 45% 10.0% 10.0% 0.0% 10.0% P1-132 Uninterruptable Power Supply Improvements at Plant 1 Tetra Tech, Inc. PDSA 11/20/2019 $784,630 $62,755 $847,385 97% 10.0% 10.0% 8.0% 2.0% P1-137 Support Buildings Seismic Improvements at Plant No. 1 Simpson, Gumpertz, and Heger PDSA 07/27/2022 $1,900,000 $151,537 $2,051,537 84% 10.0% 10.0% 8.0% 2.0% P1-140 Activated Sludge-1 Rehabilitation at Plant No. 1 HDR Engineering, Inc. PDSA 12/15/2022 $18,462,443 $0 $18,462,443 34% 10.0% 10.0% 0.0% 10.0% P2-123 Return Activated Sludge Piping Replacement at Plant 2 Spec Services, Inc. PCSA 09/25/2019 $252,329 $25,233 $277,562 100% 10.0% 10.0% 10.0% 0.0% P2-124 Interim Food Waste Receiving Facility Kennedy/Jenks Consultants, Inc. PDSA 09/26/2018 $695,000 $31,168 $726,168 100% 10.0% 10.0% 4.5% 5.5% P2-128 Digester Replacement at Plant No. 2 Brown and Caldwell PDSA 07/22/2020 $39,300,000 $9,602,657 $48,902,657 61% 10.0% 26.0% 24.4% 1.6% P2-137A Digester P and R Dome Tendon Repair CDM Smith Inc. PCSA 08/27/2024 $209,000 $0 $209,000 6% 10.0% 10.0% 0.0% 10.0% P2-138 Operations and Maintenance Complex at Plant No. 2. Stantec Architecture Inc. PDSA 01/25/2023 $7,914,529 $431,414 $8,345,943 25% 10.0% 42.0% 5.5% 36.5% Table 7 - Active Engineering Services Agreements Project/Contract Consultant Type Award Date Contract Amount Contingency Award Amendments Current % Spent Original Current Used Remaining P2-98A A-Side Primary Clarifiers Replacement at Plant 2 SEL Engineering Services Inc. PSA 05/23/2023 $97,399 $0 $97,399 0% 0.0% 0.0% P2-98A A-Side Primary Clarifiers Replacement at Plant 2 Black & Veatch Corporation PCSA 05/26/2021 $8,400,000 $0 $8,400,000 54% 10.0% 10.0% 0.0% 10.0% PS21-06 Urban Runoff Optimization Study Michael Baker International, Inc. PSA 03/22/2023 $711,230 $70,700 $781,930 82% 10.0% 10.0% 9.9% 0.1% PS21-07 Process Simulation Model Development for Cen Gen Facilities Intelliflux Controls PSA 02/05/2024 $150,308 $0 $150,308 0% 10.0% 10.0% 0.0% 10.0% RE21-01 Supercritical Water Oxidation Demonstration at Plant No. 1 374Water Systems, Inc. PSA 12/15/2021 $5,139,000 $101,558 $5,240,558 42% 10.0% 10.0% 2.0% 8.0% Total $201,582,435 $23,256,254 $224,838,689 Table 8 - Active Task Orders by Master Agreement Agreement/Project Consultant Award Date Original Task Order Value Amendments Current Task Order Value % Spent 2017 Master Agreements for On-Call Planning Studies PS19-03 Laboratory Rehabilitation Feasibility Study HDR Engineering, Inc. 10/20/2020 $274,888 $0 $274,888 81% Subtotal $274,888 $0 $274,888 2018 Master Professional Design Service Agreements FE18-06 CenGen Instrument Air Compressors Replacement at Plant No. 1 IDS Group, Inc. 04/27/2020 $89,876 $0 $89,876 83% FE18-13 Redhill Relief Sewer Relocation at State Route 55 GHD, Inc. 03/27/2020 $168,612 $105,331 $273,943 91% FE18-14 Plant Water Pipeline Replacement in Kinnison, Lindstrom, and Scott Tunnels at Plant No. 2 Dudek 11/06/2019 $108,308 $21,544 $129,852 97% FE19-02 Cengen Plant Water Pipe Replacement at Plant No. 1 AECOM Technical Services, Inc. 07/08/2020 $156,498 $143,378 $299,876 83% FE19-03 Trickling Filter Sludge and Scum Pumps Replacement at Plant No. 1 Black & Veatch Corporation 09/02/2020 $244,728 $55,272 $300,000 98% FE19-06 EPSA Motor Cooling Improvements at Plant No. 2 IDS Group, Inc. 05/05/2020 $88,206 $10,541 $98,747 100% FE19-10 Digesters C, D, F, G and I Gas Balance Lines Replacement at Plant No. 2 GHD, Inc. 02/03/2021 $25,000 $65,749 $90,749 80% FE19-11 Primary Clarifiers Nos. 6-31 Lighting and Alarm Improvements at Plant No. 1 AECOM Technical Services, Inc. 09/21/2020 $226,685 $6,137 $232,822 75% FE19-13 VFD Replacements at Seal Beach Pump Station AECOM Technical Services, Inc. 03/24/2021 $78,033 $0 $78,033 60% FE20-01 Wastehauler Station Safety and Security Improvements AECOM Technical Services, Inc. 03/16/2021 $161,012 $16,247 $177,259 91% FE20-02 Digester C, D, F, and G Mechanical Rehabilitation at Plant No. 2 HDR Engineering, Inc. 03/02/2021 $188,212 $34,352 $222,564 86% FE20-03 Return Activated Sludge Discharge Piping Replacement at Activated Sludge Plant No. 1 GHD, Inc. 06/14/2021 $249,000 $0 $249,000 92% FE20-04 Cengen Cooling Water Pipe Replacement at Plant No. 2 Dudek 05/18/2021 $240,000 $130,000 $370,000 84% FE20-05 Plant Water Piping Replacement at Secondary Clarifiers 1-26 at Plant No. 1 IDS Group, Inc. 06/22/2021 $186,626 $0 $186,626 77% FE20-08 Olive Sub-Trunk Siphon Rehabilitation at Santa Ana River Dudek 06/10/2021 $240,000 $0 $240,000 97% Table 8 - Active Task Orders by Master Agreement Agreement/Project Consultant Award Date Original Task Order Value Amendments Current Task Order Value % Spent FE20-09 CenGen Smoke Detection Improvements at Plant No. 1 and No. 2 IDS Group, Inc. 06/15/2021 $63,275 $0 $63,275 83% FR1-0011 VFD Replacements at Plant No. 1 Black & Veatch Corporation 04/08/2021 $283,000 $17,000 $300,000 83% FRC-0009 Bitter Point Trunk Sewer Repair at Bitter Point Pump Station GHD, Inc. 06/17/2021 $159,451 $0 $159,451 83% Subtotal $2,956,522 $605,551 $3,562,073 2020 Master Agreements for On-Call Planning Studies PS19-03 Laboratory Rehabilitation Feasibility Study Hazen and Sawyer 01/17/2023 $23,825 $0 $23,825 100% PS20-09 Thickening & Dewatering Plant Water Study at Plant No. 1 HDR Engineering, Inc. 04/21/2022 $219,670 $0 $219,670 80% PS21-08 Pure Oxygen Activated Sludge Operations Study at Plant No. 2 Hazen and Sawyer 09/22/2022 $241,791 $55,413 $297,204 100% PS21-10 Integrated Nitrogen Management Hazen and Sawyer 10/19/2023 $247,000 $0 $247,000 20% PS22-02 Onsite Oxygen Generation Feasibility Study at Plant No. 2 Black & Veatch Corporation 02/13/2023 $393,374 $17,718 $411,092 52% Subtotal $1,125,660 $73,131 $1,198,791 2021 Master Professional Design Service Agreements FE21-08 Newhope-Placentia Sewer Manhole Replacements GHD, Inc. 02/28/2023 $235,820 $0 $235,820 90% FE22-01 Platform Modifications for Process Areas at Plant No. 1 and No. 2 ProjectLine Technical Services. Inc. 03/14/2023 $159,296 $0 $159,296 80% FR1-0017 Trickling Filter Valve Replacement at Plant No. 1 Dudek 08/16/2022 $101,108 $0 $101,108 90% FR1-0018 Dewatering Centrifuge Diverter Gate Improvements at Plant No. 1 Dudek 08/16/2022 $140,000 $93,191 $233,191 97% FR1-0023 Secondary Treatment Area Cable Replacement at Plant No. 1 Brown and Caldwell 06/28/2024 $338,943 $0 $338,943 10% FR2-0023 Activated Sludge Clarifier Entry Improvements at Plant No. 2 AECOM Technical Services, Inc. 01/13/2022 $120,030 $79,828 $199,858 68% FR2-0027 Heavy Mechanics Group Office Space Upgrade at Plant No. 2 ProjectLine Technical Services. Inc. 09/13/2022 $126,153 $0 $126,153 97% FR2-0031 Activated Sludge System Scum Rerouting at Plant No. 2 GHD, Inc. 06/14/2024 $369,479 $72,305 $441,784 7% Table 8 - Active Task Orders by Master Agreement Agreement/Project Consultant Award Date Original Task Order Value Amendments Current Task Order Value % Spent FRC-0010 Warner Avenue Vault Cover Improvements Kleinfelder, Inc. 11/16/2021 $205,000 $43,128 $248,128 87% FRC-0014 Magnolia Sewer Manhole Abandonment at Interstate-5 Brown and Caldwell 03/15/2023 $195,055 $0 $195,055 58% FRC-0017 Valve Replacements and Wet Well Access Improvements at Slater Pump Station Dudek 06/14/2024 $281,000 $0 $281,000 20% FRJ-0003 Interplant Gas Line Blow Off Vault Repairs Dudek 09/08/2022 $165,000 $55,091 $220,091 89% J-120A Control Room Reconfiguration at Plant No.1 ProjectLine Technical Services. Inc. 12/04/2023 $255,036 $27,672 $282,708 85% P1-142 Trickling Filter Media Replacement at Plant No. 1 Brown and Caldwell 05/21/2024 $397,030 $56,128 $453,158 20% P2-127 Collections Yard Relocation and Warehouse Demolition at Plant No. 2 ProjectLine Technical Services. Inc. 08/02/2022 $188,898 $121,517 $310,415 97% SC19-06 EPSA Standby Power Generator Control Upgrades at Plant No. 2 Spec Services, Inc. 11/03/2021 $241,153 $58,847 $300,000 77% Subtotal $3,519,001 $607,707 $4,126,708 2024 On-Call Planning Studies PS23-01 Fleet Facilities Improvements Study Stantec Consulting Services Inc. 09/10/2024 $243,543 $0 $243,543 0% PS23-03 2025 Outfall Initial Dilution Model Hazen and Sawyer 07/16/2024 $425,232 $0 $425,232 0% PS23-06 Seismic Resilience Study at Plant No. 2 Brown and Caldwell 10/22/2024 $488,959 $0 $488,959 0% Subtotal $1,157,734 $0 $1,157,734 Agreement for Design Installation, Implementation and Maintenance of a Process Control System J-120A Control Room Reconfiguration at Plant No.1 ABB, Inc. 10/28/2024 $356,622 $0 $356,622 0% Subtotal $356,622 $0 $356,622 Total $9,390,427 $1,286,389 $10,676,816 29 Table 9 - Planning Studies Status Report Project Number Project Name Status Allocated Budget PS19-03 Laboratory Rehabilitation Feasibility Study Active $450,000 PS20-02 Collection System Flow Level Monitoring Study Active $743,218 PS20-08 Euclid Trunk Sewer Hydraulic Modeling and Odor Control Analyses Active $500,000 PS20-09 Thickening & Dewatering Plant Water Study at Plant No. 1 Active $400,000 PS21-01 Exterior Lighting Study at Plant Nos. 1 and 2 Active $345,533 PS21-02 Public Announcement and Fire System at Plant Nos. 1 and 2 Active $500,000 PS21-04 Energy and Digester Gas Master Plan Active $1,785,000 PS21-05 CAD Design Manual Update for 3D Design Active $758,000 PS21-06 Urban Runoff Optimization Study Active $1,100,000 PS21-07 Process Simulation Model Development for Cen Gen Facilities Active $211,192 PS21-10 Integrated Nitrogen Management Active $372,000 PS22-02 Onsite Oxygen Generation Feasibility Study at Plant No. 2 Active $295,000 PS23-01 Fleet Facilities Improvements Study Active $350,000 PS23-03 2025 Outfall Initial Dilution Model Active $708,000 PS23-04 Digital Asset Management Study Active $630,000 PS23-05 Utility Water Planning Study at Plant Nos. 1 and 2 Active $1,100,000 PS23-06 Seismic Resilience Study at Plant No. 2 Active $946,000 PS24-01 Deep Well Injection Feasibility Study Active $450,000 Grand Total $11,643,943 Number of Chartered Projects 18 Board Approved Program Budget $25,000,000 Remaining Unallocated Budget $13,356,057 30 Table 10 - Research Program Status Report Project Number Project Name Status Allocated Budget RE20-06 Co-Thickened Sludge Pump Trial at Plant No. 1 Active $160,000 RE21-01 Supercritical Water Oxidation Demonstration at Plant No. 1 Active $7,941,029 Grand Total $8,101,029 Number of Chartered Projects 2 Board Approved Program Budget $10,000,000 Remaining Unallocated Budget $1,898,971 31 Table 11 - Small Construction Projects Program Status Report Project Number Project Name Status Allocated Budget FE18-06 CenGen Instrument Air Compressors Replacement at Plant No. 1 Active $1,150,000 FE18-13 Redhill Relief Sewer Relocation at State Route 55 Active $4,100,000 FE18-14 Plant Water Pipeline Replacement in Kinnison, Lindstrom, and Scott Tunnels at Plant No. 2 Active $2,300,000 FE19-01 Pump Station Portable Generator Connectors Active $2,570,000 FE19-02 Cengen Plant Water Pipe Replacement at Plant No. 1 Active $5,725,000 FE19-03 Trickling Filter Sludge and Scum Pumps Replacement at Plant No. 1 Active $3,200,000 FE19-04 Sunflower Pump Replacement at Plant No. 1 Active $4,300,000 FE19-06 EPSA Motor Cooling Improvements at Plant No. 2 Active $1,825,000 FE19-08 Secondary Treatment VFD Replacements at Plant No. 2 Active $2,900,000 FE19-10 Digesters C, D, F, G and I Gas Balance Lines Replacement at Plant No. 2 Active $176,000 FE19-11 Primary Clarifiers Nos. 6-31 Lighting and Alarm Improvements at Plant No. 1 Active $1,250,000 FE20-01 Wastehauler Station Safety and Security Improvements Active $2,923,000 FE20-02 Digester C, D, F, and G Mechanical Rehabilitation at Plant No. 2 Active $6,622,000 FE20-03 Return Activated Sludge Discharge Piping Replacement at Activated Sludge Plant No. 1 Active $6,840,000 FE20-04 Cengen Cooling Water Pipe Replacement at Plant No. 2 Active $5,180,000 FE20-05 Plant Water Piping Replacement at Secondary Clarifiers 1-26 at Plant No. 1 Active $2,485,000 FE20-08 Olive Sub-Trunk Siphon Rehabilitation at Santa Ana River Active $3,500,000 FE20-09 CenGen Smoke Detection Improvements at Plant No. 1 and No. 2 Active $950,000 FE21-01 Plasma Cutting Fume Extractor installation at Plant No. 1 Rebuild Shop Active $400,700 FE21-04 Thickening and Dewatering Facility Handrail Installation at Plant No. 1 Active $510,000 FE21-06 Chemical Dosing Station Installation at Westside Pump Station Active $560,000 FE21-07 Liquid Oxygen Tank A Replacement at Plant No. 2 Active $3,800,000 FE21-08 Newhope-Placentia Sewer Manhole Replacements Active $1,225,000 FE22-01 Platform Modifications for Process Areas at Plant No. 1 and No. 2 Active $1,300,000 FE22-02 Liquid Oxygen Tank B Replacement at Plant No. 2 Active $4,200,000 FE23-01 Digester Gas Compressor Dryer Replacements at Plant Nos. 1 and 2 Active $8,000,000 FE23-03 Wetwell Level Monitoring Upgrade at Collections Pump Stations Active $4,005,000 FE23-04 Truck Loading Scale Replacement at Plant No. 2 Active $916,000 FE23-05 Primary Clarifier Nos. 6-31 Scum Pump Replacement at Plant No. 1 Active $3,789,000 32 Table 11 - Small Construction Projects Program Status Report Project Number Project Name Status Allocated Budget FE23-06 HVAC Replacements at Plant Nos. 1 and 2 Active $2,840,000 FE23-07 Pipeline Utility Easement Clean Up in Huntington Beach Active $4,500,000 FE23-08 Power Buildings 7 and 8 HVAC Replacement at Plant No. 1 Active $850,000 FE23-09 Primary Clarifiers F and G Rotating Mechanism Rehabilitation at Plant No. 2 Active $4,360,000 FE24-02 Gas Compressor Building Heat Exchanger Replacement at Plant No. 1 Active $640,000 SC19-03 Return Activated Sludge Pump Station Elevator Rehabilitation at Plant No. 2 Active $890,000 SC19-06 EPSA Standby Power Generator Control Upgrades at Plant No. 2 Active $4,800,000 SC20-02 Ocean Outfall Booster Station Elevator Rehabilitation Active $410,000 SC22-01 EPSA Electrical Building and Distribution Center H HVAC System Replacement at Plant No. 2 Active $5,100,000 SC22-02 HVAC Replacement for Plant 2 Centrifuge Building, Operations Building, and Bitter Point PS Active $3,712,000 SC23-01 Electric Vehicle Charging Stations and Network Installation Active $391,000 SC23-02 Effluent Junction Box Security Fence Replacement at Plant No. 1 Active $130,000 SC23-03 Collection System Critical Assets Active $145,000 Grand Total $115,469,700 Number of Chartered Projects 42 Board Approved Program Budget $125,000,000 Remaining Unallocated Budget $9,530,300 33 Table 12 - Information Technology Capital Program Status Report Project Number Project Name Status Allocated Budget IT19-05 IT P1 & P2 Data Refresh (IT19-05) Active $1,200,000 IT20-05 Client Management Modernization (ICE-69_IT20-05) 6520005 Active $99,000 IT20-08 Field Computer for Nerissa and Interface with LIMS(ICE-68_IT20-07) 6520008 Active $121,000 IT20-10 Digitize Quality Assurance Tracking Processes/TNI/ELAP Standards (ICE-76_IT20-10) 6520010 Active $145,700 IT21-04 Databridge Scale Management Software (ICE - 84_IT21-04) Active $42,752 IT23-03 Workforce Timecard Migration (ICE-98_IT23-03) Active $314,403 IT23-04 Evacuation Mustering & Visitor Management System (ICE -99_IT23- 04) Active $176,000 IT24-01 ServiceNow Employee Center Intranet Portal Migrations (ICE - 101_IT24-01) Active $148,467 Grand Total $2,247,322 Number of Chartered Projects 8 Board Approved Program Budget $10,000,000 Remaining Unallocated Budget $7,752,678 OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4326 Agenda Date:6/25/2025 Agenda Item No:6. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: SANTA ANA TRUNK SEWER REHABILITATION, PROJECT NO. 1-23 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve an agreement with the Union Pacific Railroad Company (UPRR)for the installation and operation of a temporary,above grade,bypass pipe in the UPRR right-of-way during the construction of Santa Ana Trunk Sewer Rehabilitation,Project No.1-23,in the amount of $373,770,in a form approved by General Counsel. BACKGROUND The Santa Ana Trunk carries sewage from the southern portion of the cities of Santa Ana and Costa Mesa to Orange County Sanitation District (OC San)Plant No.1.This sewer was originally constructed in the early 1950s and consists of unlined 42-inch and 48-inch diameter reinforced concrete pipes.Over the past 60 years,several projects have replaced or rehabilitated small portions of the sewer and rehabilitated most of the manholes. The project area for the Santa Ana Trunk Sewer Rehabilitation is located on Alton Avenue heading west from Bristol Street then diagonally through easements in a light industrial/commercial area toward Plant No. 1. There is an UPRR right-of-way that runs parallel to Alton Avenue. RELEVANT STANDARDS ·Protect OC San assets ·Maintain collaborative and cooperative relationships with regulators,stakeholders,and neighboring communities ·Maintain a culture of improving efficiency to reduce the cost to provide the current services level or standard PROBLEM To facilitate the required rehabilitation work,sewer flows along Alton Avenue must be bypassed.In addition,several flows originating north of the UPRR tracks need to be intercepted and rerouted around the bypassed section.The only viable route for this bypass piping is through the UPRR right-Orange County Sanitation District Printed on 6/18/2025Page 1 of 3 powered by Legistar™ File #:2025-4326 Agenda Date:6/25/2025 Agenda Item No:6. around the bypassed section.The only viable route for this bypass piping is through the UPRR right- of-way. UPRR requires an agreement to allow OC San use of their right-of-way for the bypass. PROPOSED SOLUTION Approve an agreement with the UPRR to allow OC San to install the needed temporary,above grade bypass pipe in the UPRR right-of-way.This agreement,including the terms,location,and the costs, has been negotiated by staff to meet the needs of the Santa Ana Trunk Sewer Rehabilitation Project and safety requirements of the UPRR. TIMING CONCERNS UPRR requires the agreement to be fully executed,including payment,by September 26,2025.The construction project is scheduled to begin in January 2026.Installing the bypass line in the UPRR right-of-way is required before the contractor can begin the repair work on the trunk line. RAMIFICATIONS OF NOT TAKING ACTION Without this agreement,bypassing of sewer flows around the UPRR right-of-way would not be possible and therefore the rehabilitation of the Santa Ana Trunk Sewer would be considerably more expensive and cause more community impacts. PRIOR COMMITTEE/BOARD ACTIONS April 2022 -Approved a Professional Design Services Agreement with Stantec Consulting Services, Inc.to provide engineering services for Santa Ana Trunk Sewer Rehabilitation,Project No.1-23,for an amount not to exceed $3,880,000; and approved a contingency of $388,000 (10%). ADDITIONAL INFORMATION N/A CEQA The project is exempt from CEQA under Class 1,2,and 3 categorical exemptions set forth in California Code of Regulations Sections 15301,15302,and 15303.A Notice of Exemption will be filed with the OC Clerk-Recorder after OC San Board of Directors approval of the Construction Contract. FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2024-25 and 2025-26,Section 8,Page 15,Santa Ana Trunk Sewer Rehabilitation, Project No. 1-23) and the budget is sufficient for the recommended action. Orange County Sanitation District Printed on 6/18/2025Page 2 of 3 powered by Legistar™ File #:2025-4326 Agenda Date:6/25/2025 Agenda Item No:6. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Union Pacific Railroad Company Agreement VP:lb Orange County Sanitation District Printed on 6/18/2025Page 3 of 3 powered by Legistar™ Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 Pipeline Encroachment 052118 Project No. 0797181Last Modified: 07/02/2018 Form Approved, AVP-Law LONGITUDINAL PIPELINE AGREEMENT Between Mile Posts 521.29 and 522.58, Santa Ana Industrial Lead Subdivision Location: Santa Ana, Orange County, California THIS AGREEMENT (“Agreement”) is made and entered into as of March 26, 2025, (“Effective Date”) by and between UNION PACIFIC RAILROAD COMPANY, a Delaware corporation, (“Licensor”) and ORANGE COUNTY SANITATION DISTRICT, to be addressed at 18480 Bandilier Circle, Fountain Valley, California 92708 (“Licensee”). IT IS MUTUALLY AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS: Article 1. LICENSOR GRANTS RIGHT. A.In consideration of the license fee to be paid by Licensee set forth below and in furtherconsideration of the covenants and agreements to be performed by Licensee, Licensor hereby grants toLicensee the right to construct and thereafter, during the term hereof, maintain and operate one (1)twenty-four inch (24") HDPE six thousand eight hundred ninety foot (6890') temporary sewer bypass pipeline encroachment only, including any appurtenances required for the operation of said pipeline(collectively, "Licensee's Facilities") across Licensor’s real property, trackage, or other facilities locatedin Santa Ana, Orange County, State of California ("Railroad Property"). The specific specifications and limited purpose for Licensee's Facilities on, along, across and under Railroad Property are described inand shown on the Print and Specifications dated January 28, 2025, attached hereto as Exhibit A andmade a part hereof. B.Licensee represents and warrants that Licensee's Facilities will (i) only be used for one (1)twenty-four inch (24") HDPE six thousand eight hundred ninety foot (6890') temporary sewer bypasspipeline encroachment, and (ii) not be used to convey any other substance, any fiber optic cable, or forany other use, whether such use is currently technologically possible, or whether such use may comeinto existence during the life of this Agreement. C.Licensee acknowledges that if it or its contractor provides Licensor with digital imagery depicting Licensee's Facilities ("Digital Imagery"), Licensee authorizes Licensor to use the DigitalImagery in preparing Exhibit A. Licensee represents and warrants that through a license or otherwise,it has the right to use the Digital Imagery and to permit Licensor to use the Digital Imagery in saidmanner.Article 2. LICENSE FEE. Upon execution of this Agreement, the Licensee shall pay to the Licensor a one-time License Fee of Three Hundred Seventy Three Thousand Seven Hundred Seventy Dollars ($373,770.00). Article 3. TERM. This Agreement shall take effect as of the Effective Date first herein written and shall continue in full force and effect until terminated as provided in the "TERMINATION; REMOVAL OF LICENSEE’S FACILITIES" Section of Exhibit B. Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 Article 4. LICENSEE'S COMPLIANCE WITH GENERAL TERMS. Licensee represents and warrants that all work on Licensee's Facilities performed by Licensee or its contractors will strictly comply with all terms and conditions set forth herein, including the General Terms and Conditions, attached hereto as Exhibit B and made a part hereof. Article 5. INSURANCE. A.During the term of this Agreement, Licensee shall fully comply or cause its contractor(s) tofully comply with the insurance requirements described in Exhibit C, attached hereto and made a parthereof. Upon request only, Licensee shall send copies of all insurance documentation (e.g., certificates,endorsements, etc.) to Licensor at the address listed in the "NOTICES" Section of this Agreement. B.If Licensee is subject to statute(s) limiting its insurance liability and/or limiting its ability toobtain insurance in compliance with Exhibit C of this Agreement, those statutes shall apply. Article 6. DEFINITION OF LICENSEE. For purposes of this Agreement, all references in this Agreement to Licensee will include Licensee's contractors, subcontractors, officers, agents and employees, and others acting under its or their authority (collectively, a "Contractor"). If a Contractor is hired by Licensee to perform any work on Licensee's Facilities (including initial construction and subsequent relocation, maintenance, and/or repair work), then Licensee shall provide a copy of this Agreement to its Contractor(s) and require its Contractor(s) to comply with all terms and conditions of this Agreement, including the indemnification requirements set forth in the "INDEMNITY" Section of Exhibit B. Licensee shall require any Contractor to release, defend, and indemnify Licensor to the same extent and under the same terms and conditions as Licensee is required to release, defend, and indemnify Licensor herein. Article 7. ATTORNEYS’ FEES, EXPENSES, AND COSTS. If litigation or other court action or similar adjudicatory proceeding is undertaken by Licensee or Licensor to enforce its rights under this Agreement, all fees, costs, and expenses, including, without limitation, reasonable attorneys’ fees and court costs, of the prevailing Party in such action, suit, or proceeding shall be reimbursed or paid by the Party against whose interest the judgment or decision is rendered. The provisions of this Article shall survive the termination of this Agreement. Article 8. WAIVER OF BREACH. The waiver by Licensor of the breach of any condition, covenant or agreement herein contained to be kept, observed and performed by Licensee shall in no way impair the right of Licensor to avail itself of any remedy for any subsequent breach thereof. Article 9. ASSIGNMENT. A.Licensee shall not assign this Agreement, in whole or in part, or any rights herein granted,without the written consent of Licensor, which must be requested in writing by Licensee. Anyassignment or attempted transfer of this Agreement or any of the rights herein granted, whethervoluntary, by operation of law, or otherwise, without Licensor's written consent, will be absolutely voidand may result in Licensor's termination of this Agreement pursuant to the "TERMINATION;REMOVAL OF LICENSEE'S FACILITIES" Section of Exhibit B. B.Upon Licensor's written consent to any assignment, this Agreement will be binding upon andinure to the benefit of the parties thereto, successors, heirs, and assigns, executors, and administrators. Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 Article 10. SEVERABILITY. Any provision of this Agreement which is determined by a court of competent jurisdiction to be invalid or unenforceable shall be invalid or unenforceable only to the extent of such determination, which shall not invalidate or otherwise render ineffective any other provision of this Agreement. Article 11. NOTICES. Except Licensee's commencement of work notice(s) required under Exhibit B, all other notices required by this Agreement must be in writing, and (i) personally served upon the business address listed below ("Notice Address"), (ii) sent overnight via express delivery by a nationally recognized overnight delivery service such as Federal Express Corporation or United Parcel Service to the Notice Address, or (iii) by certified mail, return receipt requested to the Notice Address. Overnight express delivery notices will be deemed to be given upon receipt. Certified mail notices will be deemed to be given three (3) days after deposit with the United States Postal Service. If to Licensor: Union Pacific Railroad Company Attn: Analyst – Real Estate Utilities (Project No. 0797181) 1400 Douglas Street, MS 1690 Omaha, Nebraska 68179 If to Licensee: Orange County Sanitation District Article 12. 18480 Bandilier CircleFountain Valley, CA 92708 SPECIAL PROVISION – CONSTRUCTION OBSERVATION. Licensor requires Licensee to provide monitoring of tracks and construction observation through Licensor approved observer named below during all construction and installation work. Licensee is to directly coordinate services with the named inspector: Railpros Field Services Email: RP.Utility@railpros.com Phone (682)223-5271 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the date first herein written. UNION PACIFIC RAILROAD COMPANY By: __________________________________ Thomas Leddy Mgr II Real Estate ORANGE COUNTY SANITATION DISTRICT By: __________________________________ Ryan P. Gallagher Board Chairman Attest: __________________________________ Jackie Castro Assistant Clerk of the Board Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 Pipeline Crossing 06/05/18 Form Approved, AVP Law EXHIBIT B GENERAL TERMS AND CONDITIONS Section 1. LIMITATION AND SUBORDINATION OF RIGHTS GRANTED. A. The foregoing grant is subject and subordinate to the prior and continuing right and obligation of Licensor to use and maintain its entire property including the right and power of Licensor to construct, maintain, repair, renew, use, operate, change, modify or relocate railroad tracks, signal, communication, fiber optics, or other wirelines, pipelines and other facilities upon, along or across any or all parts of its property, all or any of which may be freely done at any time or times by Licensor without liability to Licensee or to any other party for compensation or damages. B. The foregoing grant is also subject to all outstanding superior rights (including those in favor of licensees and lessees of Railroad Property) and the right of Licensor to renew and extend the same, and is made without covenant of title or for quiet enjoyment. It shall be Licensee's sole obligation to obtain such additional permission, license and grants necessary on account of any such existing rights. Section 2. ENGINEERING REQUIREMENTS; PERMITS. A. Licensee's Facilities will be designed, constructed, operated, maintained, repaired, renewed, modified, reconstructed, removed, or abandoned in place on Railroad Property by Licensee or its contractor to Licensor's satisfaction and in strict conformity with: (i) Licensor’s current engineering standards and specifications, including those for shoring and cribbing to protect Licensor's railroad operations and facilities ("UP Specifications"), except for variances approved in advance in writing by Licensor’s Assistant Vice President Engineering – Design or its authorized representative ("UP Engineering Representative"); (ii) such other additional safety standards as Licensor, in its sole discretion, elects to require, including, without limitation, American Railway Engineering and Maintenance-of-Way Association ("AREMA") standards and guidelines (collectively, "UP Additional Requirements"); and (iii) all applicable laws, rules, and regulations, including any applicable Federal Railroad Administration and Federal Energy Regulatory Commission regulations and enactments (collectively, "Laws"). If there is any conflict between UP Specifications, UP Additional Requirements, and Laws, the most restrictive will apply. B. Licensee shall keep the soil over Licensee's Facilities thoroughly compacted, and maintain the grade over and around Licensee's Facilities even with the surface of the adjacent ground. C. If needed, Licensee shall secure, at Licensee's sole cost and expense, any and all necessary permits required to perform any work on Licensee's Facilities. Section 3. NOTICE OF COMMENCEMENT OF WORK; EMERGENCIES. A. Licensee and its contractors are strictly prohibited from commencing any work associated with Licensee's Facilities without Licensor's written approval that the work will be in strict compliance with the "ENGINEERING REQUIREMENTS; PERMITS" Section of this Exhibit B. Upon Licensor's approval, Licensee shall contact both of Licensor's field representatives ("Licensor's Field Representatives") at least ten (10) days before commencement of any work on Licensee's Facilities. B. Licensee shall not commence any work until: (1) Licensor has determined whether flagging or other special protective or safety measures ("Safety Measures") are required for performance of the work pursuant to the "FLAGGING" Section of this Exhibit B and provided Licensee written Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 authorization to commence work; and (2) Licensee has complied with the "PROTECTION OF FIBER OPTIC CABLE SYSTEMS" Section of this Exhibit B. C. If, at any time, an emergency arises involving Licensee's Facilities, Licensee or its contractor shall immediately contact Licensor's Response Management Communications Center at (888) 877-7267. Section 4. FLAGGING. A. Following Licensee's notice to Licensor's Field Representatives required under the "NOTICE OF COMMENCEMENT OF WORK; EMERGENCIES" Section of this Exhibit B, Licensor shall inform Licensee if Safety Measures are required for performance of the work by Licensee or its contractor on Railroad Property. If Safety Measures are required, no work of any kind may be performed by Licensee or its contractor(s) until arrangements for the Safety Measures have been made and scheduled. If no Safety Measures are required, Licensor will give Licensee written authorization to commence work. B. If any Safety Measures are performed or provided by Licensor, including but not limited to flagging, Licensor shall bill Licensee for such expenses incurred by Licensor, unless Licensor and a federal, state, or local governmental entity have agreed that Licensor is to bill such expenses to the federal, state, or local governmental entity. Additional information regarding the submission of such expenses by Licensor and payment thereof by Licensee can be found in the "LICENSEE’S PAYMENT OF EXPENSES" Section of this Exhibit B. If Licensor performs any Safety Measures, Licensee agrees that Licensee is not relieved of any of responsibilities or liabilities set forth in this Agreement. C. For flagging, the rate of pay per hour for each flagger will be the prevailing hourly rate in effect for an eight-hour day for the class of flagmen used during regularly assigned hours and overtime in accordance with Labor Agreements and Schedules in effect at the time the work is performed. In addition to the cost of such labor, a composite charge for vacation, holiday, health and welfare, supplemental sickness, Railroad Retirement and unemployment compensation, supplemental pension, Employees Liability and Property Damage, and Administration will be included, computed on actual payroll. The composite charge will be the prevailing composite charge in effect at the time the work is performed. One and one-half times the current hourly rate is paid for overtime, Saturdays and Sundays, and two and one-half times current hourly rate for holidays. Wage rates are subject to change, at any time, by law or by agreement between Licensor and its employees, and may be retroactive as a result of negotiations or a ruling of an authorized governmental agency. Additional charges on labor are also subject to change. If the wage rate or additional charges are changed, Licensee (or the governmental entity, as applicable) shall pay on the basis of the new rates and charges. D. Reimbursement to Licensor will be required covering the full eight-hour day during which any flagger is furnished, unless the flagger can be assigned to other railroad work during a portion of such day, in which event reimbursement will not be required for the portion of the day during which the flagger is engaged in other railroad work. Reimbursement will also be required for any day not actually worked by the flaggers following the flaggers' assignment to work on the project for which Licensor is required to pay the flaggers and which could not reasonably be avoided by Licensor by assignment of such flaggers to other work, even though Licensee may not be working during such time. When it becomes necessary for Licensor to bulletin and assign an employee to a flagging position in compliance with union collective bargaining agreements, Licensee must provide Licensor a minimum of five (5) days notice prior to the cessation of the need for a flagger. If five (5) days notice of cessation is not given, Licensee will still be required to pay flagging charges for the days the flagger was scheduled, even though flagging is no longer required for that period. An additional ten (10) days notice must then be given to Licensor if flagging services are needed again after such five day cessation notice has been given to Licensor. Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 Section 5. SAFETY. A. Safety of personnel, property, rail operations and the public is of paramount importance in the prosecution of any work on Railroad Property performed by Licensee or its contractor, and takes precedence over any work on Licensee's Facilities to be performed Licensee or its contractors. Licensee shall be responsible for initiating, maintaining and supervising all safety operations and programs in connection with any work on Licensee's Facilities. Licensee and its contractor shall, at a minimum comply, with Licensor's then current safety standards located at the below web address ("Licensor's Safety Standards") to ensure uniformity with the safety standards followed by Licensor's own forces. As a part of Licensee's safety responsibilities, Licensee shall notify Licensor if it determines that any of Licensor's Safety Standards are contrary to good safety practices. Licensee and its contractor shall furnish copies of Licensor's Safety Standards to each of its employees before they enter Railroad Property. Union Pacific Current Safety Requirements B. Licensee shall keep the job site on Railroad Property free from safety and health hazards and ensure that their employees are competent and adequately trained in all safety and health aspects of the work. C. Licensee represents and warrants that all parts of Licensee's Facilities within and outside of the limits of Railroad Property will not interfere whatsoever with the constant, continuous, and uninterrupted use of the tracks, property, and facilities of Licensor, and nothing shall be done or suffered to be done by Licensee at any time that would in any manner impair the safety thereof. D. Licensor's operations and work performed by Licensor’s personnel may cause delays in Licensee's or its contractor's work on Licensee's Facilities. Licensee accepts this risk and agrees that Licensor shall have no liability to Licensee or any other person or entity for any such delays. Licensee must coordinate any work on Railroad Property by Licensee or any third party with Licensor's Field Representatives in strict compliance with the "NOTICE OF COMMENCEMENT OF WORK; EMERGENCIES" Section of this Exhibit E. Licensor shall have the right, if it so elects, to provide any support it deems necessary for the safety of Licensor's operations and trackage during Licensee's or its contractor's construction, maintenance, repair, renewal, modification, relocation, reconstruction, or removal of Licensee's Facilities. In the event Licensor provides such support, Licensor shall invoice Licensee, and Licensee shall pay Licensor as set forth in the "LICENSEE'S PAYMENT OF EXPENSES" Section of this Exhibit B. F. Licensee may use unmanned aircraft systems ("UAS") to inspect Licensee's Facilities only upon the prior authorization from and under the direction of Licensor's Field Representatives. Licensee represents and warrants that its use of UAS on Railroad Property will comply with Licensor's then-current Unmanned Aerial Systems Policy and all applicable laws, rules and regulations, including any applicable Federal Aviation Administration regulations and enactments pertaining to UAS. Section 6. PROTECTION OF FIBER OPTIC CABLE SYSTEMS. Fiber optic cable systems may be buried on Railroad Property. Protection of the fiber optic cable systems is of extreme importance since any break could disrupt service to users resulting in business interruption and loss of revenue and profits. In addition to the notifications required under the "NOTICE OF COMMENCEMENT OF WORK; EMERGENCIES" Section of this Exhibit B, Licensee shall complete the required form at up.com/CBUD to determine if fiber optic cable is buried anywhere on Railroad Property to be used by Licensee. If it is, Licensee shall telephone the telecommunications company(ies) involved, and arrange for a cable locator, make arrangements for relocation or other protection of the fiber optic cable, all at Licensee’s expense, and will not commence any work on Railroad Property until all such protection or relocation has been completed. Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 Section 7. LICENSEE'S PAYMENT OF EXPENSES. A. Licensee shall bear the entire cost and expense of the design, construction, maintenance, modification, reconstruction, repair, renewal, revision, relocation, or removal of Licensee's Facilities. B. Licensee shall fully pay for all materials joined, affixed to and labor performed on Railroad Property in connection with the construction, maintenance, modification, reconstruction, repair, renewal, revision, relocation, or removal of Licensee's Facilities, and shall not permit or suffer any mechanic’s or materialman’s lien of any kind or nature to be enforced against the property for any work done or materials furnished thereon at the instance or request or on behalf of Licensee. Licensee shall promptly pay or discharge all taxes, charges, and assessments levied upon, in respect to, or on account of Licensee's Facilities, to prevent the same from becoming a charge or lien upon any property of Licensor, and so that the taxes, charges, and assessments levied upon or in respect to such property shall not be increased because of the location, construction, or maintenance of Licensee's Facilities or any improvement, appliance, or fixture connected therewith placed upon such property, or on account of Licensee’s interest therein. Where such tax, charge, or assessment may not be separately made or assessed to Licensee but shall be included in the assessment of the property of Licensor, then Licensee shall pay to Licensor an equitable proportion of such taxes determined by the value of Licensee’s property upon property of Licensor as compared with the entire value of such property. C. As set forth in the "FLAGGING" Section of this Exhibit B, Licensor shall have the right, if it so elects, to provide any Safety Measures Licensor deems necessary for the safety of Licensor's operations and trackage during Licensee's or its contractor's construction, maintenance, modification, reconstruction, repair, renewal, revision, relocation, or removal of Licensee's Facilities, including, but not limited to supervision, inspection, and flagging services. In the event Licensor provides such Safety Measures, Licensor shall submit an itemized invoice to Licensee's notice recipient listed in the "NOTICES" Article of this Agreement. Licensee shall pay to Licensor the total amount listed on such invoice within thirty (30) days of Licensee's receipt of such invoice. Section 8. MODIFICATIONS TO LICENSEE'S FACILITIES. A. This grant is subject to Licensor's safe and efficient operation of its railroad, and continued use and improvement of Railroad Property (collectively, "Railroad's Use"). Accordingly, Licensee shall, at its sole cost and expense, modify, reconstruct, repair, renew, revise, relocate, or remove (individually, "Modification", or collectively, "Modifications") all or any portion of Licensee's Facilities as Licensor may designate or identify, in its sole discretion, in the furtherance of Railroad's Use. B. Upon any Modification of all or any portion of Licensee's Facilities to another location on Railroad Property, Licensor and Licensee shall execute a Supplemental Agreement to this Pipeline Agreement to document the Modification(s) to Licensee's Facilities on Railroad Property. If the Modifications result in Licensee's Facilities moving off of Railroad Property, this Agreement will terminate upon Licensee's completion of such Modification(s) and all requirements contained within the "TERMINATION; REMOVAL OF LICENSEE’S FACILITIES" Section of this Exhibit B. Any such Modification(s) off of Railroad Property will not release Licensee from any liability or other obligation of Licensee arising prior to and upon completion of any such Modifications to the Licensee's Facilities. Section 9. RESTORATION OF RAILROAD PROPERTY. In the event Licensee, in any manner moves or disturbs any property of Licensor in connection with the construction, maintenance, modification, reconstruction, repair, renewal, revision, relocation, or removal of Licensee's Facilities, then, Licensee shall, as soon as possible and at Licensee’s sole cost Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 and expense, restore Licensor’s property to the same condition as the same were before such property was moved or disturbed. Section 10. INDEMNITY. A. Definitions. As used in this Section: 1. "Licensor" includes Licensor, its affiliates, its and their officers, directors, agents and employees, and other railroad companies using Railroad Property at or near the location of Licensee’s installation and their officers, directors, agents, and employees. 2. "Licensee" includes Licensee and its agents, contractors, subcontractors, sub- subcontractors, employees, officers, and directors, or any other person or entity acting on its behalf or under its control. 3. "Loss" includes claims, suits, taxes, loss, damages (including punitive damages, statutory damages, and exemplary damages), costs, charges, assessments, judgments, settlements, liens, demands, actions, causes of action, fines, penalties, interest, and expenses of any nature, including court costs, reasonable attorneys’ fees and expenses, investigation costs, and appeal expenses. B. Licensee shall release, defend, indemnify, and hold harmless Licensor from and against any and all Loss, even if groundless, fraudulent, or false, that directly or indirectly arises out of or is related to Licensee’s construction, maintenance, modification, reconstruction, repair, renewal, revision, relocation, removal, presence, use, or operation of Licensee's Facilities, including, but not limited to, any actual or alleged: 1. Bodily harm or personal injury (including any emotional injury or disease) to, or the death of, any person(s), including, but not limited to, Licensee, Licensor, any telecommunications company, or the agents, contractors, subcontractors, sub-subcontractors, or employees of the foregoing; 2. Damage to or the disturbance, loss, movement, or destruction of Railroad Property, including loss of use and diminution in value, including, but not limited to, any telecommunications system(s) or fiber optic cable(s) on or near Railroad Property, any property of Licensee or Licensor, or any property in the care, custody, or control of Licensee or Licensor; 3. Removal of person(s) from Railroad Property; 4. Any delays or interference with track or Railroad’s Use caused by Licensee's activity(ies) on Railroad Property, including without limitation the construction, maintenance, modification, reconstruction, repair, renewal, revision, relocation, or removal of Licensee's Facilities or any part thereof, any activities, labor, materials, equipment, or machinery in conjunction therewith; 5. Right(s) or interest(s) granted pursuant to this Agreement; 6. Contents escaping from Licensee's Facilities, including without limitation any actual or alleged pollution, contamination, breach, or environmental Loss; Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 7. Licensee’s breach of this Agreement or failure to comply with its provisions, including, but not limited to, any violation or breach by Licensee of any representations and warranties Licensee has made in this Agreement; and 8. Violation by Licensee of any law, statute, ordinance, governmental administrative order, rule, or regulation, including without limitation all applicable Federal Railroad Administration regulations. C. THE FOREGOING OBLIGATIONS SHALL APPLY TO THE FULLEST EXTENT PERMITTED BY LAW FOR THE BENEFIT OF LICENSOR TO LOSSES CAUSED BY, ARISING FROM, RELATING TO, OR RESULTING FROM, IN WHOLE OR IN PART, THE NEGLIGENCE OF LICENSOR, AND SUCH NEGLIGENCE OF LICENSOR SHALL NOT LIMIT, DIMINISH, OR PRECLUDE LICENSEE’S OBLIGATIONS TO LICENSOR IN ANY RESPECT. NOTWITHSTANDING THE FOREGOING, SUCH OBLIGATION TO INDEMNIFY LICENSOR SHALL NOT APPLY TO THE EXTENT THE LOSS IS CAUSED BY THE SOLE, ACTIVE AND DIRECT NEGLIGENCE, GROSS NEGLIGENCE, OR WILLFUL MISCONDUCT OF LICENSOR AS DETERMINED IN A FINAL JUDGMENT BY A COURT OF COMPETENT JURISDICTION. Section 11. TERMINATION; REMOVAL OF LICENSEE'S FACILITIES. A. If Licensee does not use the right herein granted on Licensee's Facilities for one (1) year, or if Licensee continues in default in the performance of any provision of this Agreement for a period of thirty (30) days after written notice from Licensor to Licensee specifying such default, Licensor may, at its sole discretion, terminate this Agreement by written notice to Licensee at the address listed in the "NOTICES" Article of this Agreement. This Agreement will not terminate until Licensee complies with Paragraphs "C" and "D" of this Section found below. B. In addition to the provisions of Paragraph "A" above, this Agreement may be terminated by written notice given by either party, without cause, upon thirty (30) days written notice to the non-terminating party at the address listed in the "NOTICES" Article of this Agreement. This Agreement will not terminate until Licensee complies with Paragraphs "C" and "D" of this Section found below. C. Prior to the effective date of any termination described in this Section, Licensee shall submit an application to Licensor's online Utility Contracts System at this link for Licensee's removal, or if applicable, abandonment in place of Licensee's Facilities located on Railroad Property ("Removal/Abandonment Work"). Upon the UP Engineering Representative's approval of Licensee's application for the Removal/Abandonment Work, Licensor and Licensee shall execute a separate consent document that will govern Licensee's performance of the Removal/Abandonment Work from those portions of Railroad Property not occupied by roadbed and/or trackage ("Consent Document"). Licensee shall then restore the impacted Railroad Property to the same or reasonably similar condition as it was prior to Licensee's installation of Licensee's Facilities. For purposes of this Section, Licensee's (i) performance of the Removal/Abandonment Work, and (ii) restoration work will hereinafter be collectively referred to as the "Restoration Work". D. Following Licensee's completion of the Restoration Work, Licensee shall provide a written certification letter to Licensor at the address listed in the "NOTICES" Article of this Agreement which certifies that the Restoration Work has been completed in accordance with the Consent Document. Licensee shall report to governmental authorities, as required by law, and notify Licensor immediately if any environmental contamination is discovered during Licensee's performance of the Restoration Work. Upon discovery, the Licensee shall initiate any and all removal, remedial and restoration actions that are necessary to restore the property to its original, uncontaminated condition. Licensee shall provide written certification to Licensor at the address listed in the "NOTICES" Article of this Agreement that environmental contamination has been remediated and the property has been Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 restored in accordance with Licensor's requirements. Upon Licensor's receipt of Licensee's restoration completion certifications, this Agreement will terminate. E. In the event that Licensee fails to complete any of the Restoration Work, Licensor may, but is not obligated, to perform the Restoration Work. Any such work actually performed by Licensor will be at the cost and expense of Licensee. In the event that Licensor performs any of the Restoration Work, Licensee shall release Licensor from any and all Loss (defined in the "INDEMNITY" Section of this Exhibit B) arising out of or related to Licensor's performance of the Restoration Work. F. Termination of this Agreement for any reason will not affect any of rights or obligations of the parties which may have accrued, or liabilities or Loss (defined in the "INDEMNITY" Section of this Exhibit B), accrued or otherwise, which may have arisen prior to such termination. Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 EXHIBIT C INSURANCE REQUIREMENTS In accordance with Article 5 of this Agreement, Licensee shall (1) procure and maintain at its sole cost and expense, or (2) require its Contractor(s) to procure and maintain, at their sole cost and expense, the following insurance coverage: A. Commercial General Liability Insurance. Commercial general liability (CGL) with a limit of not less than $2,000,000 each occurrence and an aggregate limit of not less than $4,000,000. CGL insurance must be written on ISO occurrence form CG 00 01 12 04 (or a substitute form providing equivalent coverage). The policy must also contain the following endorsement, WHICH MUST BE STATED ON THE CERTIFICATE OF INSURANCE: • Contractual Liability Railroads ISO form CG 24 17 10 01 (or a substitute form providing equivalent coverage) showing "Union Pacific Railroad Company Property" as the Designated Job Site. B. Business Automobile Coverage Insurance. Business auto coverage written on ISO form CA 00 01 10 01 (or a substitute form providing equivalent liability coverage) with a limit of not less $2,000,000 for each accident, and coverage must include liability arising out of any auto (including owned, hired, and non-owned autos). The policy must contain the following endorsements, WHICH MUST BE STATED ON THE CERTIFICATE OF INSURANCE: • "Coverage For Certain Operations In Connection With Railroads" ISO form CA 20 70 10 01 (or a substitute form providing equivalent coverage) showing "Union Pacific Railroad Company Property" as the Designated Job Site. C. Workers' Compensation and Employers' Liability Insurance. Coverage must include but not be limited to: • Licensee’s statutory liability under the workers' compensation laws of the state(s) affected by this Agreement. • Employers' Liability (Part B) with limits of at least $500,000 each accident, $500,000 disease policy limit $500,000 each employee. If Licensee is self-insured, evidence of state approval and excess workers' compensation coverage must be provided. Coverage must include liability arising out of the U. S. Longshoremen's and Harbor Workers' Act, the Jones Act, and the Outer Continental Shelf Land Act, if applicable. D. Environmental Liability Insurance. Environmental Legal Liability Insurance (ELL) applicable to bodily injury, property damage, including loss of use of damaged property or of property that has not been physically injured or destroyed, cleanup costs, and defense, including costs and expenses incurred in the investigation, defense, or settlement of claims, or compliance with statute, all in connection with any loss arising from the insured’s performance under this Agreement. Except with respect to the limits of insurance, and any rights or duties specifically assigned to the first named insured, this insurance must apply as if each named insured were the only named insured; and separately to the additional insured against which claim is made or suit is brought. Coverage shall be maintained in an amount of at least $2,000,000 per loss, with an annual aggregate of at least $4,000,000. Licensee warrants that any retroactive date applicable to ELL insurance coverage under the policy is the same as or precedes the Effective Date of this Agreement, and that continuous coverage Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 will be maintained for a period of five (5) years beginning from the time the work under this Agreement is completed or if coverage is cancelled for any reason the policies extended discovery period, if any, will be exercised for the maximum time allowed. E. Railroad Protective Liability Insurance. Licensee must maintain for the duration of work "Railroad Protective Liability" insurance written on ISO occurrence form CG 00 35 12 04 (or a substitute form providing equivalent coverage) on behalf of Licensor only as named insured, with a limit of not less than $2,000,000 per occurrence and an aggregate of $6,000,000. The definition of "JOB LOCATION" and "WORK" on the declaration page of the policy shall refer to this Agreement and shall describe all WORK or OPERATIONS performed under this Agreement. Notwithstanding the foregoing, Licensee does not need Railroad Protective Liability Insurance after its initial construction work is complete and all excess materials have been removed from Licensor's property; PROVIDED, however, that Licensee shall procure such coverage for any subsequent maintenance, repair, renewal, modification, reconstruction, or removal work on Licensee's Facilities. F. Umbrella or Excess Insurance. If Licensee utilizes umbrella or excess policies, and these policies must "follow form" and afford no less coverage than the primary policy. Other Requirements G. All policy(ies) required above (except business automobile, workers' compensation and employers' liability) must include Licensor as "Additional Insured" using ISO Additional Insured Endorsement CG 20 26 (or substitute form(s) providing equivalent coverage). The coverage provided to Licensor as additional insured shall not be limited by Licensee’s liability under the indemnity provisions of this Agreement. BOTH LICENSOR AND LICENSEE EXPECT THAT LICENSOR WILL BE PROVIDED WITH THE BROADEST POSSIBLE COVERAGE AVAILABLE BY OPERATION OF LAW UNDER ISO ADDITIONAL INSURED FORM CG 20 26. H. Punitive damages exclusion, if any, must be deleted (and the deletion indicated on the certificate of insurance), unless (a) insurance coverage may not lawfully be obtained for any punitive damages that may arise under this Agreement, or (b) all punitive damages are prohibited by all states in which this Agreement will be performed. I. Licensee waives all rights of recovery, and its insurers also waive all rights of subrogation of damages against Licensor and its agents, officers, directors and employees for damages covered by the workers' compensation and employers' liability or commercial umbrella or excess liability obtained by Licensee required in this Agreement, where permitted by law. This waiver must be stated on the certificate of insurance. J. All insurance policies must be written by a reputable insurance company acceptable to Licensor or with a current Best's Insurance Guide Rating of A- and Class VII or better, and authorized to do business in the state(s) in which the work is to be performed. K. The fact that insurance is obtained by Licensee will not be deemed to release or diminish the liability of Licensee, including, without limitation, liability under the indemnity provisions of this Agreement. Damages recoverable by Licensor from Licensee or any third party will not be limited by the amount of the required insurance coverage. Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340 March 26, 2025 Project: 0797181 OC SAN RE: Proposed Construction of One (1) Six Thousand Eight Hundred Ninety Foot (6890') Twenty-Four Inch (24") HDPE Temporary Sewer Bypass Pipeline Encroachment Only Between Mile Posts 521.29 and 522.58 on the Santa Ana Industrial Lead Subdivision at or near Santa Ana, Orange County, California. Attached is an original of the agreement covering your use of the Railroad Company’s right of way. Review and return the partially executed agreement via email. Payment, with Project No. 0797181 referenced, in the amount of Three Hundred Seventy Three Thousand Seven Hundred Seventy ($373,770.00) is due and payable to Union Pacific Railroad Company upon your execution of the agreement. If you require formal billing, you may consider this letter as a formal bill. In compliance with the Internal Revenue Service's new policy regarding their Form 1099, I certify that 946001323 is this Corporation’s correct Federal Taxpayer Identification Number. Send Electronic Payments to: Name: Bank of America, Dallas, TX Union Pacific Account = 3752021457 • ACH Routing Number = 1110-0001-2 • Wire Routing Number = 026009593 Mail Checks to: Union Pacific Railroad Company 12567 Collection Center Drive Chicago, IL 60693 • CHECKS ONLY – NO AGREEMENTS UP does not currently offer a credit card option for these payments. Railroad Protective Liability Insurance (RPLI) may be obtained from any insurance company which offers such coverage. Union Pacific has also worked with a national broker, Marsh USA, to make available RPLI to you or your contractor. You can find additional information, premium quotes, and application forms at (uprr.marsh.com). If we have not received the executed document within six months from the date of this letter, this proposed offer of an agreement is withdrawn and becomes null and void. After final approval and processing, the fully-executed agreement will be returned to you via email with instructions for coordinating your work. In no event should you begin work until you have received your counterpart of the fully-executed agreement. If you have any questions, please contact me at tleddy@up.com. Sincerely, Thomas Leddy Mgr II Real Estate OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4327 Agenda Date:6/25/2025 Agenda Item No:7. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS, PROJECT NO. J-98 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Receive and file Bid Tabulation and Recommendation for Electrical Power Distribution System Improvements, Project No. J-98; B. Award a Construction Contract Agreement to Shimmick Construction Company, Inc., for Electrical Power Distribution System Improvements, Project No. J-98, for a total amount not to exceed $ 24,352,127; and C. Approve a contingency of $2,435,213 (10%). BACKGROUND The electrical distribution systems at Orange County Sanitation District (OC San)Plant Nos.1 and 2 supply power to all plant facilities and consist of distribution centers,power buildings,and electrical rooms throughout both plants.These facilities use switchgear and automatic transfer switches to distribute power from three different generation sources,Southern California Edison (SCE),Central Generation Facility (CenGen), and standby generators. RELEVANT STANDARDS ·Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder ·24/7/365 treatment plant reliability ·Protect OC San assets PROBLEM During an SCE power outage at Plant No.1,CenGen is not capable of powering the entire plant, resulting in CenGen shutting down and select critical loads being automatically powered by standby generators.The remaining loads required for wastewater treatment will not be powered until the central generation facility is restarted,and electrical maintenance is called out to reconfigure the electrical system.In addition,there is a high arc flash potential at a number of electrical switchgearOrange County Sanitation District Printed on 6/18/2025Page 1 of 4 powered by Legistar™ File #:2025-4327 Agenda Date:6/25/2025 Agenda Item No:7. electrical system.In addition,there is a high arc flash potential at a number of electrical switchgear lineups throughout Plant No. 1. At Plant No.2,the plant power monitoring and control system and arc flash mitigation system were not extended to Distribution Center A and Power Building B due to anticipated demolition at the time of design.The Power Building B 12kV-480V transformers have reached the end of their useful life. The Power Building D generator,automatic transfer switch,and 12kV-480V transformer have reached the end of their useful life.Headworks and Effluent Pump Station Annex (EPSA)standby generator systems do not have connections to easily load test the generators or a grounding system that meets the latest industry standards. PROPOSED SOLUTION Award a construction contract agreement to implement a load shedding system and arc flash mitigation system at Plant No.1 (similar to Project No.J-117B at Plant No.2);extend the plant power monitoring and controls system and arc flash mitigation system to Distribution Center A and Power Building B;replace aged transformers at Power Building B;refeed Power Building D from Distribution Center F;and add portable load bank connections and grounding system improvements at the Headworks and EPSA standby generation facilities. TIMING CONCERNS If the project is delayed,the electrical distribution system may suffer from reduced safety,reduced reliability,increased maintenance costs,and unexpected process facility outages with increased potential for spills. RAMIFICATIONS OF NOT TAKING ACTION Numerous small and large projects would need to be initiated to install,replace,and upgrade the various protective relays,breakers,conductors,and grounding systems.At Plant No.1,the electrical distribution system would continue to have a more time-consuming restoration of power during a loss of SCE power. PRIOR COMMITTEE/BOARD ACTIONS N/A ADDITIONAL INFORMATION OC San advertised Project No.J-98 for bids on December 12,2024,and four sealed bids were received on March 18, 2025. A summary of the bid opening follows: Engineer’s Estimate $ 13,200,000 Bidder Amount of Bid Shimmick Construction Company, Inc.$ 24,352,127 Helix Electric, Inc.$ 25,700,000 LEED Electric, Inc.$ 27,654,892 Mass Electric Construction Company $ 36,203,000 Orange County Sanitation District Printed on 6/18/2025Page 2 of 4 powered by Legistar™ File #:2025-4327 Agenda Date:6/25/2025 Agenda Item No:7. Engineer’s Estimate $ 13,200,000 Bidder Amount of Bid Shimmick Construction Company, Inc.$ 24,352,127 Helix Electric, Inc.$ 25,700,000 LEED Electric, Inc.$ 27,654,892 Mass Electric Construction Company $ 36,203,000 The bids were evaluated in accordance with the OC San’s policies and procedures.A notice was sent to all bidders on April 24,2025,informing them of the intent of OC San staff to recommend award of the Construction Contract Agreement to Shimmick Construction Company, Inc. OC San received bids from multiple Contractors,three within similar range and all higher than the Engineer’s Estimate.This indicates that the Engineer’s Estimate was significantly lower than the actual project cost. Given the cost difference,OC San issued a clarification request to Shimmick Construction Company, Inc.asking to provide general cost estimates for the work related to site,civil,electrical, instrumentation,and general conditions to closely compare the information against the Engineer’s Estimate and understand the areas where the gaps between the amounts were. Shimmick Construction Company,Inc.bid cost was higher than the Engineer’s Estimate in the following areas:1)site and civil (153%higher);2)Engineer’s Estimate did not include costs for temporary power and shutdowns,and underestimated commissioning costs (90%higher);3) Engineer’s Estimate did not account for the extensive engineering for shop drawing,field verification, and commissioning for the switchgear modifications (84%higher);4)the equipment cost escalation outpaced the cost index rates used in the Engineer’s Estimate for the 2021 and 2023 equipment quotes (44% higher); and 5) General Conditions (77% higher). Based on the three lowest bids and the cost factors identified during the bid review,staff believe the difference between the Engineer’s Estimate and Shimmick Construction Company,Inc.’s price is accounted for and reasonable. Staff recommends awarding a Construction Contract Agreement to the lowest responsive and responsible bidder,Shimmick Construction Company,Inc.,for a total amount not to exceed $ 24,352,127. CEQA The project is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations section 15301.A Notice of Exemption has been filed with the OC Clerk- Recorder. FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2024-25 and 2025-26,Section 8,Page 48,Electrical Power Distribution System Improvements,Project No.J-98)and an increase to the project budget is being requested as part of the annual budget update.The award of this contract will be contingent upon approval of the Orange County Sanitation District Printed on 6/18/2025Page 3 of 4 powered by Legistar™ File #:2025-4327 Agenda Date:6/25/2025 Agenda Item No:7. part of the annual budget update.The award of this contract will be contingent upon approval of the increased project budget as part of the budget update adoption. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Construction Contract Agreement ·Presentation TW:lb Orange County Sanitation District Printed on 6/18/2025Page 4 of 4 powered by Legistar™ C-CA-101424 PART A CONTRACT AGREEMENT C-CA-101424 TABLE OF CONTENTS CONTRACT AGREEMENT SECTION – 1 GENERAL ................................................................................. 1 SECTION – 2 MATERIALS AND LABOR ........................................................ 4 SECTION – 3 PROJECT ................................................................................. 4 SECTION – 4 PLANS AND SPECIFICATIONS ............................................... 5 SECTION – 5 TIME OF COMMENCEMENT AND COMPLETION .................. 5 SECTION – 6 TIME IS OF THE ESSENCE ..................................................... 5 SECTION – 7 EXCUSABLE DELAYS ............................................................. 6 SECTION – 8 EXTRA WORK .......................................................................... 6 SECTION – 9 CHANGES IN PROJECT .......................................................... 7 SECTION – 10 LIQUIDATED DAMAGES FOR DELAY .................................... 7 SECTION – 11 CONTRACT PRICE AND METHOD OF PAYMENT ................. 7 SECTION – 12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF FUNDS .......................................................... 9 SECTION – 13 COMPLETION .......................................................................... 9 SECTION – 14 CONTRACTOR’S EMPLOYEES COMPENSATION .............. 10 SECTION – 15 SURETY BONDS ................................................................... 12 SECTION – 16 INSURANCE ........................................................................... 12 SECTION – 17 RISK AND INDEMNIFICATION .............................................. 21 SECTION – 18 TERMINATION ....................................................................... 21 SECTION – 19 WARRANTY ........................................................................... 21 SECTION – 20 ASSIGNMENT ........................................................................ 22 SECTION – 21 RESOLUTION OF DISPUTES ................................................ 22 SECTION – 22 SAFETY & HEALTH ............................................................... 22 SECTION – 23 CALIFORNIA VOLUNTARY PROTECTION PROGRAM ANNUAL REPORTING REQUIREMENT................................ 23 SECTION – 24 NOTICES ................................................................................ 23 CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 1 of 25 CONTRACT AGREEMENT ORANGE COUNTY SANITATION DISTRICT PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS This CONTRACT AGREEMENT (Contract Agreement) is made and entered into, to be effective, this June 25, 2025, by and between Shimmick Construction Company, Inc., hereinafter referred to as “CONTRACTOR” and the Orange County Sanitation District, hereinafter referred to as “OC SAN”. WITNESSETH That for and in consideration of the promises and agreements hereinafter made and exchanged, OC SAN and CONTRACTOR agree as follows: SECTION – 1 GENERAL CONTRACTOR certifies and agrees that all the terms, conditions and obligations of the Contract Documents as hereinafter defined, the location of the job site, and the conditions under which the Work is to be performed have been thoroughly reviewed, and enters into this Contract based upon CONTRACTOR’s investigation of all such matters and is in no way relying upon any opinions or representations of OC SAN. It is agreed that this Contract represents the entire agreement. It is further agreed that the Contract Documents are each incorporated into this Contract by reference, with the same force and effect as if the same were set forth at length herein, and that CONTRACTOR and its Subcontractors, if any, will be and are bound by any and all of said Contract Documents insofar as they relate in any part or in any way, directly or indirectly, to the Work covered by this Contract. A. Contract Documents Order of Precedence “Contract Documents” refers to those documents identified in the definition of “Contract Documents” in the General Conditions, “Definitions”. C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 2 of 25 1. In the event of a conflict between one Contract Document and any of the other Contract Documents, the provisions in the document highest in precedence shall be controlling. The order of precedence of the Contract Documents is as follows: a. Supplemental Agreements – the last in time being the first in precedence b. Addenda issued prior to the date for submittal of Bids – the last in time being the first in precedence c. Contract Agreement d. Permits and other regulatory requirements e. Special Provisions f. General Conditions (GC) g. Notice Inviting Bids and Instruction to Bidders h. Geotechnical Baseline Report (GBR), if attached as a Contract Document i. Plans and Specifications – in these documents the order of precedence shall be: i. Specifications (Divisions 01-17) ii. Plans iii. General Requirements (GR) iv. Standard Drawings and Typical Details j. CONTRACTOR’s Bid 2. In the event of a conflict between terms within an individual Contract Document, the conflict shall be resolved by applying the following principles as appears applicable: a. Figured dimensions on the Contract Documents shall govern. Dimensions not specified shall be as directed by the ENGINEER. Details not shown or specified shall be the same as similar parts that are shown or specified, or as directed. Full-size details shall take precedence over scale Drawings as to CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 3 of 25 shape and details of construction. Specifications shall govern as to material and workmanship. b. The Contract Documents calling for the higher quality material or workmanship shall prevail. Materials or Work described in words, which so applied, have a well-known technical or trade meaning shall be deemed to refer to such recognized standards. In the event of any discrepancy between any Drawings and the figures thereon, the figures shall be taken as correct. c. Scale Drawings, full-size details, and Specifications are intended to be fully complementary and to agree. Should any discrepancy between Contract Documents come to the CONTRACTOR’s attention, or should an error occur in the efforts of others, which affect the Work, the CONTRACTOR shall notify the ENGINEER, in writing, at once. In the event any doubts or questions arise with respect to the true meaning of the Contract Documents, reference shall be made to the ENGINEER whose written decision shall be final. If the CONTRACTOR proceeds with the Work affected without written instructions from the ENGINEER, the CONTRACTOR shall be fully responsible for any resultant damage or defect. d. Anything mentioned in the Specifications and not indicated in the Plans, or indicated in the Plans and not mentioned in the Specifications, shall be of like effect as if indicated and mentioned in both. In case of discrepancy in the Plans or Specifications, the matter shall be immediately submitted to OC SAN’s ENGINEER, without whose decision CONTRACTOR shall not adjust said discrepancy save only at CONTRACTOR’s own risk and expense. The decision of the ENGINEER shall be final. C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 4 of 25 In all matters relating to the acceptability of material, machinery or plant equipment; classifications of material or Work; the proper execution, progress or sequence of the Work; and quantities interpretation of the Contract Documents, the decision of the ENGINEER shall be final and binding, and shall be a condition precedent to any payment under the Contract, unless otherwise ordered by the Board of Directors. B. Definitions Capitalized terms used in this Contract are defined in the General Conditions, “Definitions”. Additional terms may be defined in the Special Provisions. SECTION – 2 MATERIALS AND LABOR CONTRACTOR shall furnish, under the conditions expressed in the Plans and Specifications, at CONTRACTOR’S own expense, all labor and materials necessary, except such as are mentioned in the Specifications to be furnished by OC SAN, to construct and complete the Project, in good workmanlike and substantial order. If CONTRACTOR fails to pay for labor or materials when due, OC SAN may settle such claims by making demand upon the Surety to this Contract. In the event of the failure or refusal of the Surety to satisfy said claims, OC SAN may settle them directly and deduct the amount of payments from the Contract Price and any amounts due to CONTRACTOR. In the event OC SAN receives a stop payment notice from any laborer or material supplier alleging non-payment by CONTRACTOR, OC SAN shall be entitled to deduct all of its costs and expenses incurred relating thereto, including but not limited to administrative and legal fees. SECTION – 3 PROJECT The Project is described as: PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 5 of 25 SECTION – 4 PLANS AND SPECIFICATIONS The Work to be done is shown in a set of Plans and Specifications entitled: PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Said Plans and Specifications and any revision, amendments and addenda thereto are attached hereto and incorporated herein as part of this Contract and referred to by reference. SECTION – 5 TIME OF COMMENCEMENT AND COMPLETION CONTRACTOR agrees to commence the Project within 15 calendar days from the date set forth in the “Notice to Proceed” sent by OC SAN, unless otherwise specified therein and shall diligently prosecute the Work to completion within one thousand three hundred thirty (1,330) calendar days from the date of the “Notice to Proceed” issued by OC SAN, excluding delays caused or authorized by OC SAN as set forth in Sections 7, 8, and 9 hereof, and applicable provisions in the General Conditions. The time for completion includes twenty (20) calendar days determined by OC SAN likely to be inclement weather when CONTRACTOR will be unable to work. SECTION – 6 TIME IS OF THE ESSENCE Time is of the essence of this Contract. As required by the Contract Documents, CONTRACTOR shall prepare and obtain approval of all shop drawings, details and samples, and do all other things necessary and incidental to the prosecution of CONTRACTOR’s Work in conformance with an approved construction progress schedule. CONTRACTOR shall coordinate the Work covered by this Contract with that of all other contractors, subcontractors and of OC SAN, in a manner that will facilitate the efficient completion of the entire Work and accomplish the required milestone(s), if any, by the applicable deadline(s) in accordance with Section 5 herein. OC SAN shall have the right to assert complete control of the premises on which the Work is to be performed and shall have the right to decide the time or order in which C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 6 of 25 the various portions of the Work shall be installed or the priority of the work of subcontractors, and, in general, all matters representing the timely and orderly conduct of the Work of CONTRACTOR on the premises. SECTION – 7 EXCUSABLE DELAYS CONTRACTOR shall only be excused for any delay in the prosecution or completion of the Project as specifically provided in General Conditions, “Extension of Time for Delay”, and the General Requirements, “By CONTRACTOR or Others – Unknown Utilities during Contract Work”. Extensions of time and extra compensation arising from such excusable delays will be determined in accordance with the General Conditions, “Extension of Time for Delay” and “Contract Price Adjustments and Payments”, and extensions of time and extra compensation as a result of incurring undisclosed utilities will be determined in accordance with General Requirements, “By CONTRACTOR or Others – Unknown Utilities during Contract Work”. OC SAN’s decision will be conclusive on all parties to this Contract. SECTION – 8 EXTRA WORK The Contract Price as set forth in Section 11, includes compensation for all Work performed by CONTRACTOR, unless CONTRACTOR obtains a Change Order signed by a designated representative of OC SAN specifying the exact nature of the Extra Work and the amount of extra compensation to be paid all as more particularly set forth in Section 9 hereof and the General Conditions, “Request for Change (Changes at CONTRACTOR’s Request)”, “OWNER Initiated Changes”, and “Contract Price Adjustments and Payments”. In the event a Change Order is issued by OC SAN pursuant to the Contract Documents, OC SAN shall extend the time fixed in Section 5 for completion of the Project by the number of days, if any, reasonably required for CONTRACTOR to perform the Extra Work, as determined by OC SAN’s ENGINEER. The decision of the ENGINEER shall be final. CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 7 of 25 SECTION – 9 CHANGES IN PROJECT OC SAN may at any time, without notice to any Surety, by Change Order, make any changes in the Work within the general scope of the Contract Document, including but not limited to changes: 1. In the Specifications (including Drawings and designs); 2. In the time, method or manner of performance of the Work; 3. In OC SAN-furnished facilities, equipment, materials, services or site; or 4. Directing acceleration in the performance of the Work. No change of period of performance or Contract Price, or any other change in the Contract Documents, shall be binding until the Contract is modified by a fully executed Change Order. All Change Orders shall be issued in accordance with the requirements set forth in the General Conditions, “Request for Change (Changes at CONTRACTOR’s Request)” and “OWNER Initiated Changes”. SECTION – 10 LIQUIDATED DAMAGES FOR DELAY Liquidated Damages shall be payable in the amounts and upon the occurrence of such events or failure to meet such requirements or deadlines as provided in the Special Provisions, “Liquidated Damages and Incentives.” SECTION – 11 CONTRACT PRICE AND METHOD OF PAYMENT A. OC SAN agrees to pay and the CONTRACTOR agrees to accept as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in approved Change Orders, the sum of Twenty-Four Million Three Hundred Fifty-Two Thousand One Hundred Twenty-Six Dollars and Seventy Cents ($24,352,126.70) as itemized on the attached Exhibit “A”. C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 8 of 25 Upon satisfaction of the conditions precedent to payment set forth in the General Requirements, Additional General Requirements, and General Conditions (including but not limited to Sections entitled “Mobilization Payment Requirements” and “Payment Itemized Breakdown of Contract Lump Sum Prices”), there shall be paid to the CONTRACTOR an initial Net Progress Payment for mobilization. OC SAN shall issue at the commencement of the job a schedule which shows: 1. A minimum of one payment to be made to the CONTRACTOR for each successive four (4) week period as the Work progresses, and 2. The due dates for the CONTRACTOR to submit requests for payment to meet the payment schedule. After the initial Net Progress Payment, and provided the CONTRACTOR submits the request for payment prior to the end of the day required to meet the payment schedule, the CONTRACTOR shall be paid a Net Progress Payment on the corresponding monthly payment date set forth in the schedule. Payments shall be made on demands drawn in the manner required by law, accompanied by a certificate signed by the ENGINEER, stating that the Work for which payment is demanded has been performed in accordance with the terms of the Contract Documents, and that the amount stated in the certificate is due under the terms of the Contract. Payment applications shall also be accompanied with all documentation, records, and releases as required by the Contract; Exhibit A, Schedule of Prices; and General Conditions, “Payment for Work – General”. The Total amount of Progress Payments shall not exceed the actual value of the Work completed as certified by OC SAN’s ENGINEER. The processing of payments shall not be considered as an acceptance of any part of the Work. CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 9 of 25 B. As used in this Section, the following defined terms shall have the following meanings: 1. “Net Progress Payment” means a sum equal to the Progress Payment less the Retention Amount and other qualified deductions (Liquidated Damages, stop payment notices, etc.). 2. “Progress Payment” means a sum equal to: a. the value of the actual Work completed since the commencement of the Work as determined by OC SAN; b. plus the value of material suitably stored at the worksite, treatment plant or approved storage yards subject to or under the control of OC SAN since the commencement of the Work as determined by OC SAN; c. less all previous Net Progress Payments; d. less all amounts of previously qualified deductions; e. less all amounts previously retained as Retention Amounts. 3. “Retention Amount” for each Progress Payment means the percentage of each Progress Payment to be retained by OC SAN to assure satisfactory completion of the Contract. The amount to be retained from each Progress Payment shall be determined as provided in the General Conditions, “Retained Funds; Substitution of Securities.” SECTION – 12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF FUNDS Pursuant to Public Contract Code Section 22300 et seq., the CONTRACTOR may, at its sole expense, substitute securities as provided in General Conditions, “Retained Funds; Substitution of Securities.” SECTION – 13 COMPLETION Final Completion and Final Acceptance shall occur at the time and in the manner specified in the General Conditions, “Final Acceptance and Final Completion”, “Final Payment”; and Exhibit A, Schedule of Prices. C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 10 of 25 Upon receipt of all documentation, records, and releases as required by the Contract from the CONTRACTOR, OC SAN shall proceed with the Final Acceptance as specified in General Conditions. SECTION – 14 CONTRACTOR’S EMPLOYEES COMPENSATION A. General Prevailing Rate: OC SAN has been advised by the State of California Director of Industrial Relations of its determination of the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime Work in the locality in which the Work is to be performed for each craft or type of Work needed to execute this Contract, and copies of the same are on file in the Office of the ENGINEER of OC SAN. The CONTRACTOR agrees that not less than said prevailing rates shall be paid to workers employed on this public works Contract as required by Labor Code Section 1774 of the State of California. Per California Labor Code 1773.2, OC SAN will have on file copies of the prevailing rate of per diem wages at its principal office and at each job site, which shall be made available to any interested party upon request. B. Forfeiture for Violation: CONTRACTOR shall, as a penalty to OC SAN, forfeit Two Hundred Dollars ($200.00) for each calendar day or portion thereof for each worker paid (either by the CONTRACTOR or any Subcontractor under it) less than the prevailing rate of per diem wages as set by the Director of Industrial Relations, in accordance with Sections 1770-1780 of the California Labor Code for the Work provided for in this Contract, all in accordance with Section 1775 of the Labor Code of the State of California. C. Apprentices: Sections 1777.5, 1777.6, 1777.7 of the Labor Code of the State of California, regarding the employment of apprentices are applicable to this Contract and the CONTRACTOR CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 11 of 25 shall comply therewith if the prime contract involves Thirty Thousand Dollars ($30,000.00) or more. D. Workday: In the performance of this Contract, not more than eight (8) hours shall constitute a day’s work, and the CONTRACTOR shall not require more than eight (8) hours of labor in a day from any person employed by him hereunder except as provided in paragraph (B) above. CONTRACTOR shall conform to Article 3, Chapter 1, Part 7 (Section 1810 et seq.) of the Labor Code of the State of California and shall forfeit to OC SAN as a penalty, the sum of Twenty-five Dollars ($25.00) for each worker employed in the execution of this Contract by CONTRACTOR or any Subcontractor for each calendar day during which any worker is required or permitted to labor more than eight (8) hours in any one calendar day and forty (40) hours in any one week in violation of said Article. CONTRACTOR shall keep an accurate record showing the name and actual hours worked each calendar day and each calendar week by each worker employed by CONTRACTOR in connection with the Project. E. Registration; Record of Wages; Inspection: CONTRACTOR shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section 1771.4, the Work is subject to compliance monitoring by the California Department of Industrial Relations. CONTRACTOR shall maintain accurate payroll records and shall submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776. CONTRACTOR shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e). C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 12 of 25 SECTION – 15 SURETY BONDS CONTRACTOR shall, before entering upon the performance of this Contract, furnish Bonds approved by OC SAN’s General Counsel – one in the amount of one hundred percent (100%) of the Contract amount, to guarantee the faithful performance of the Work, and the other in the amount of one hundred percent (100%) of the Contract amount to guarantee payment of all claims for labor and materials furnished. As changes to the Contract occur via approved Change Orders, the CONTRACTOR shall assure that the amounts of the Bonds are adjusted to maintain 100% of the Contract Price. This Contract shall not become effective until such Bonds are supplied to and approved by OC SAN. Bonds must be issued by a Surety authorized by the State Insurance Commissioner to do business in California. The Performance Bond shall remain in full force and effect through the warranty period, as specified in Section 19 below. All Bonds required to be submitted relating to this Contract must comply with California Code of Civil Procedure Section 995.630. Each Bond shall be executed in the name of the Surety insurer under penalty of perjury, or the fact of execution of each Bond shall be duly acknowledged before an officer authorized to take and certify acknowledgments, and either one of the following conditions shall be satisfied: A. A copy of the transcript or record of the unrevoked appointment, power of attorney, by- laws, or other instrument, duly certified by the proper authority and attested by the seal of the insurer entitling or authorizing the person who executed the Bond to do so for and on behalf of the insurer, is on file in the Office of the County Clerk of the County of Orange; or B. A copy of a valid power of attorney is attached to the Bond. SECTION – 16 INSURANCE CONTRACTOR shall purchase and maintain, for the duration of the Contract, insurance against claims for injuries to persons, or damages to property which may arise from or in connection with the performance of the Work hereunder, and the results of that Work by CONTRACTOR, CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 13 of 25 its agents, representatives, employees, or Subcontractors, in amounts equal to the requirements set forth below. CONTRACTOR shall not commence Work under this Contract until all insurance required under this Section is obtained in a form acceptable to OC SAN, nor shall CONTRACTOR allow any Subcontractor to commence Work on a subcontract until all insurance required of the Subcontractor has been obtained. CONTRACTOR shall maintain all of the foregoing insurance coverages in force through the point at which the Work under this Contract is fully completed and accepted by OC SAN pursuant to the provisions of the General Conditions, “Final Acceptance and Final Completion”. Furthermore, CONTRACTOR shall maintain all of the foregoing insurance coverages in full force and effect throughout the warranty period, commencing on the date of Final Acceptance. The requirement for carrying the foregoing insurance shall not derogate from the provisions for indemnification of OC SAN by CONTRACTOR under Section 17 of this Contract. Notwithstanding nor diminishing the obligations of CONTRACTOR with respect to the foregoing, CONTRACTOR shall subscribe for and maintain in full force and effect during the life of this Contract, inclusive of all changes to the Contract Documents made in accordance with the provisions of the General Conditions, “Request for Change (Changes at CONTRACTOR’s Request)” and/or “OWNER Initiated Changes”, the following insurance in amounts not less than the amounts specified. OC SAN reserves the right to amend the required limits of insurance commensurate with the CONTRACTOR’s risk at any time during the course of the Project. No vehicles may enter OC SAN premises/worksite without possessing the required insurance coverage. CONTRACTOR’s insurance shall also comply with all insurance requirements prescribed by agencies from whom permits shall be obtained for the Work and any other third parties from whom third party agreements are necessary to perform the Work (collectively, the “Third Parties”). The Special Provisions may list such requirements and sample forms and requirements from such Third Parties may be included in an attachment to the General C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 14 of 25 Requirements. CONTRACTOR bears the responsibility to discover and comply with all requirements of Third Parties, including meeting specific insurance requirements, that are necessary for the complete performance of the Work. To the extent there is a conflict between the Third Parties’ insurance requirements and those set forth by OC SAN herein, the requirement(s) providing the more protective coverage for both OC SAN and the Third Parties shall control and be purchased and maintained by CONTRACTOR. If CONTRACTOR maintains higher limits than the minimums shown in this Section, OC SAN requires and shall be entitled to coverage for the higher limits maintained by the CONTRACTOR. Where permitted by law, CONTRACTOR hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, performing Work or rendering services on behalf of OC SAN in connection with the planning, development and construction of the Project. In all its insurance coverages (except for Professional Liability/Errors and Omissions coverages, if applicable) related to the Work, CONTRACTOR shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their officers, agents, or employees, performing Work or rendering services at the Project. Where permitted by law, CONTRACTOR shall require similar written express waivers and insurance clauses from each of its Subcontractors of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged. CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 15 of 25 A. Limits of Insurance 1. General Liability: Five Million Dollars ($5,000,000) per occurrence and a general aggregate limit of Ten Million Dollars ($10,000,000) for bodily injury, personal injury and property damage. If aggregate limits apply separately to this contract (as evidenced by submission of ISO form CG 25 03 or CG 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Coverage shall include each of the following: a. Premises-Operations. b. Products and Completed Operations, with limits of at least Five Million Dollars ($5,000,000) per occurrence and a general aggregate limit of Ten Million Dollars ($10,000,000) which shall be in effect at all times during the warranty period set forth in the Warranty section herein, and as set forth in the General Conditions, “Warranty (CONTRACTOR’s Guarantee)”, plus any additional extension or continuation of time to said warranty period that may be required or authorized by said provisions. If aggregate limits apply separately to this contract (as evidenced by submission of ISO form CG 25 03 or CG 25 04), then the aggregate limit may be equivalent to the per occurrence limit. c. Broad Form Property Damage, expressly including damage arising out of explosion, collapse, or underground damage. d. Contractual Liability, expressly including the indemnity provisions assumed under this Contract. e. Separation of Insured Clause, providing that coverage applies separately to each insured, except with respect to the limits of liability. C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 16 of 25 f. Independent CONTRACTOR’s Liability. To the extent first dollar coverage, including defense of any claim, is not available to OC SAN or any other additional insured because of any SIR, deductible, or any other form of self insurance, CONTRACTOR is obligated to assume responsibility of insurer until the deductible, SIR or other condition of insurer assuming its defense and/or indemnity has been satisfied. CONTRACTOR shall be responsible to pay any deductible or SIR. g. If a crane will be used, the general liability insurance will be endorsed to add Riggers Liability coverage or its equivalent to cover the usage of the crane and exposures with regard to the crane operators, riggers and others involved in using the crane. h. If divers will be used, the general liability insurance will be endorsed to cover marine liability or its equivalent to cover the usage of divers. 2. Automobile Liability: The CONTRACTOR shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: combined single limit of One Million Dollars ($1,000,000) for bodily injury, personal injury, and property damage. 3. Umbrella Excess Liability: The minimum limits of general liability and automobile liability insurance required, as set forth above, shall be provided for either in a single policy of primary insurance or a combination of policies of primary and umbrella excess coverage. Excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automobile liability. CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 17 of 25 4. Drone Liability Insurance: If a drone will be used, drone liability insurance must be maintained by CONTRACTOR in the amount of One Million Dollars ($1,000,000) in a form acceptable to OC SAN. 5. Workers’ Compensation/Employer’s Liability: CONTRACTOR shall provide such workers’ compensation insurance as required by the Labor Code of the State of California, including employer’s liability with a minimum limit of One Million Dollars ($1,000,000) per accident for bodily injury or disease. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage with regard to Jones Act claims. B. Deductibles and Self-Insured Retentions Deductibles or self-insured retentions (SIRs) shall not exceed One Million Dollars ($1,000,000) without prior agreement from OCSAN. C. Other Insurance Provisions 1. Each such policy of general liability insurance and automobile liability insurance shall be endorsed to contain, the following provisions: a. OC SAN, its directors, officers, agents, consultants, and employees, and all public agencies from whom permits will be obtained, and their directors, officers, agents, and employees are hereby declared to be additional insureds under the terms of this policy, but only with respect to the operations of CONTRACTOR at or from any of the sites of OC SAN in connection with this Contract, or acts and omissions of the additional insured in connection with its general supervision or inspection of said operations related to this Contract. b. Insurance afforded by the additional insured endorsement shall apply as primary insurance, and other insurance maintained by OC SAN shall be excess only and not contributing with insurance provided under this policy. C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 18 of 25 2. Cancellation and Policy Change Notice. The CONTRACTOR is required to notify OC SAN in writing of any insurance cancellation notice it receives or other knowledge of pending or actual insurance policy cancellation within two (2) working days of receipt of such notice or acquisition of such knowledge. Additionally, the CONTRACTOR is required to notify OC SAN in writing of any change in the terms of insurance, including reduction in coverage or increase in deductible/SIR, within two (2) working days of receipt of such notice or knowledge of same. Said notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Contracts, Purchasing & Materials Management Division 3. Coverage shall not extend to any indemnity coverage for the active negligence of any additional insured in any case where an agreement to indemnify the additional insured would be invalid under California Civil Code Section 2782(b). 4. If required by a public agency from whom permit(s) will be obtained, each policy of general liability insurance and automobile liability insurance shall be endorsed to specify by name the public agency and its legislative members, officers, agents, consultants, and employees, to be additional insureds. D. Acceptability of Insurers Insurers must have an “A-“, or better, Policyholder’s Rating, and a Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best Rating Guide. OC SAN recognizes that State Compensation Insurance Fund has withdrawn from participation in the A.M. Best Rating Guide process. Nevertheless, OC SAN will accept CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 19 of 25 State Compensation Insurance Fund for the required policy of worker’s compensation insurance, subject to OC SAN’s option, at any time during the term of this Contract, to require a change in insurer upon twenty (20) days written notice. Further, OC SAN will require CONTRACTOR to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONTRACTOR by OC SAN or its agent. E. Verification of Coverage CONTRACTOR shall furnish OC SAN with original certificates and mandatory endorsements affecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before Work commences. OC SAN reserves the right to require complete, certified copies of all required insurance policies, including endorsements, affecting the coverage required by these Specifications at any time. F. Subcontractors CONTRACTOR shall be responsible to establish insurance requirements for any Subcontractors hired by CONTRACTOR. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the Subcontractor’s operations and work. OC SAN and any public agency issuing permits for the Project must be named as “Additional Insured” on any general liability or automobile liability policy obtained by a Subcontractor. The CONTRACTOR must obtain copies and maintain current versions of all Subcontractors’ policies, certificate of liability and mandatory endorsements effecting coverage. Upon request, CONTRACTOR must furnish OC SAN with the above referenced required documents. C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 20 of 25 G. Required Forms and Endorsements 1. Required ACORD Form a. Certificate of Liability ACORD Form 25 or other equivalent certificate of insurance form 2. Required Insurance Services Office, Inc. Endorsements (when alternative forms are shown, they are Iisted in order of preference) In the event any of the following forms are cancelled by Insurance Services Office, Inc. (ISO), or are updated, the ISO replacement form or equivalent must be supplied. a. Commercial General Liability Form CG 00 01 b. Additional Insured Including Form CG 20 10 and Products-Completed Operations Form CG 20 37 All other additional insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN. c. Waiver of Transfer of Rights of Form CG 24 04 Recovery Against Others to Us/ Waiver of Subrogation 3. Required State Compensation Insurance Fund Endorsements a. Waiver of Subrogation Submit workers’ compensation waiver of subrogation endorsement provided by carrier for OC SAN approval. b. Cancellation Notice No endorsement is required. However, CONTRACTOR is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article C.2., Cancellation and Policy Change Notice, above. 4. Additional Required Endorsements a. Notice of Policy Termination Manuscript Endorsement CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 21 of 25 SECTION – 17 RISK AND INDEMNIFICATION All Work covered by this Contract done at the site of construction or in preparing or delivering materials to the site shall be at the risk of CONTRACTOR alone. CONTRACTOR shall save, indemnify, defend, and keep OC SAN and others harmless as more specifically set forth in General Conditions, “General Indemnification”. SECTION – 18 TERMINATION This Contract may be terminated in whole or in part in writing by OC SAN in the event of substantial failure by the CONTRACTOR to fulfill its obligations under this Contract Agreement, or it may be terminated by OC SAN for its convenience provided that such termination is effectuated in a manner and upon such conditions set forth more particularly in General Conditions, “Termination for Default” and/or “Termination for Convenience”, provided that no termination may be effected unless proper notice is provided to CONTRACTOR at the time and in the manner provided in said General Conditions. If termination for default or convenience is effected by OC SAN, an equitable adjustment in the price provided for in this Contract shall be made at the time and in the manner provided in the General Conditions, “Termination for Default” and “Termination for Convenience”. SECTION – 19 WARRANTY The CONTRACTOR agrees to perform all Work under this Contract in accordance with the Contract Documents, including OC SAN’s designs, Drawings and Specifications. The CONTRACTOR guarantees for a period of at least one (1) year from the date of Final Acceptance of the Work, pursuant to the General Conditions, “Final Acceptance and Final Completion” that the completed Work is free from all defects due to faulty materials, equipment or workmanship and that it shall promptly make whatever adjustments or corrections which may be necessary to cure any defects, including repairs of any damage to other parts of the system C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 22 of 25 resulting from such defects. OC SAN shall promptly give notice to the CONTRACTOR of observed defects. In the event that the CONTRACTOR fails to make adjustments, repairs, corrections or other work made necessary by such defects, OC SAN may do so and charge the CONTRACTOR the cost incurred. The CONTRACTOR’s warranty shall continue as to any corrected deficiency until the later of (1) the remainder of the original one-year warranty period; or (2) one year after acceptance by OC SAN of the corrected Work. The Performance Bond and the Payment Bond shall remain in full force and effect through the guarantee period. The CONTRACTOR’s obligations under this clause are in addition to the CONTRACTOR’s other express or implied assurances under this Contract, including but not limited to specific manufacturer or other extended warranties specified in the Plans and Specifications, or state law and in no way diminish any other rights that OC SAN may have against the CONTRACTOR for faulty materials, equipment or Work. SECTION – 20 ASSIGNMENT No assignment by the CONTRACTOR of this Contract or any part hereof, or of funds to be received hereunder, will be recognized by OC SAN unless such assignment has had prior written approval and consent of OC SAN and the Surety. SECTION – 21 RESOLUTION OF DISPUTES OC SAN and the CONTRACTOR shall comply with the provisions of California Public Contract Code Section 20104 et. seq., regarding resolution of construction claims for any Claims which arise between the CONTRACTOR and OC SAN, as well as all applicable dispute and Claims provisions as set forth in the General Conditions and as otherwise required by law. SECTION – 22 SAFETY & HEALTH CONTRACTOR shall comply with all applicable safety and health requirements mandated by federal, state, city and/or public agency codes, permits, ordinances, regulations, and laws, as CONFORMED C-CA-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 23 of 25 well as these Contract Documents, including but not limited to the General Requirements, Section entitled “Safety” and Exhibit B Contractor Safety Standards. OC SAN reserves the right to stop Work for violations of safety and health standards until the hazardous conditions are corrected. The right to stop Work includes the right to remove a contractor or its employees from the worksite. SECTION – 23 CALIFORNIA VOLUNTARY PROTECTION PROGRAM ANNUAL REPORTING REQUIREMENT If CONTRACTOR will potentially work 1,000 combined hours in a quarter, for the term of the Contract Agreement, CONTRACTOR shall provide an annual report detailing its safety and health information, including, but not limited to, its total number of employees, work hours, number of injuries and illnesses, and number of injury and illness cases involving days away from work, restricted work activity and/or job transfer. CONTRACTOR shall furnish this report to OC SAN no later than January 20th each calendar year. Failure to provide this data by the required due date may result in suspension of CONTRACTOR’s services with OC SAN. Any delay arising out of or resulting from such suspension shall be CONTRACTOR’s sole responsibility and considered CONTRACTOR caused delay, which shall not be compensable by OC SAN. SECTION – 24 NOTICES Any notice required or permitted under this Contract shall be served by personal delivery or by certified mail, return receipt requested, at the address set forth below. Unless specified elsewhere in the Contract Documents or otherwise required by law, any notice may alternatively be given by electronic telecommunication to the email address set forth below. Any party whose address changes shall notify the other party in writing. C-CA-101424 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 24 of 25 TO OC SAN: Orange County Sanitation District 18480 Bandilier Circle Fountain Valley, California 92708 Attn: Clerk of the Board ocsanclerk@ocsan.gov Copy to: Orange County Sanitation District 18480 Bandilier Circle Fountain Valley, California 92708 Attn: Construction Manager rcuellar@ocsan.gov Scott C. Smith Best Best & Krieger LLP 18101 Von Karman Avenue, Suite 1000 Irvine, California 92612 scott.smith@bbklaw.com TO CONTRACTOR: Ural Yal, CEO & President Shimmick Construction Company, Inc. 530 Technology Drive, Suite 300 Irvine, CA 92618 cvieux@shimmick.com CONFORMED C-CA-101424PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 25 of 25 IN WITNESS WHEREOF, the parties hereto have executed this Contract Agreement as the date first hereinabove written. CONTRACTOR: Shimmick Construction Company, Inc. 530 Technology Drive, Suite 300 Irvine, CA 92618 By______________________________ Date _________________ ______________________________ Printed Name Its______________________________ CONTRACTOR’s State License No. 594575 (Expiration Date – 5/31/2026) OC SAN: Orange County Sanitation District By______________________________ Date _________________ Ryan P. Gallagher Board Chairman By______________________________ Date _________________ Jackie Castro Assistant Clerk of the Board By______________________________ Date _________________ Kevin Work Purchasing & Contracts Manager C-EXA-062221 EXHIBIT A SCHEDULE OF PRICES C-EXA-062221 TABLE OF CONTENTS EXHIBIT A SCHEDULE OF PRICES EXA-1 BASIS OF COMPENSATION ............................................................................. 1 EXA-2 PROGRESS PAYMENTS .................................................................................. 1 EXA-3 RETENTION AND ESCROW ACCOUNTS ........................................................ 1 EXA-4 STOP PAYMENT NOTICE ................................................................................. 3 EXA-5 PAYMENT TO SUBCONTRACTORS ................................................................ 3 EXA-6 PAYMENT OF TAXES ....................................................................................... 3 EXA-7 FINAL PAYMENT ............................................................................................... 4 EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT ... 5 ATTACHMENT 1 – CERTIFICATION FOR REQUEST FOR PAYMENT ......................... 7 ATTACHMENT 2 – SCHEDULE OF PRICES ................................................................... 8 CONFORMED C-EXA-062221 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 1 of 8 EXHIBIT A SCHEDULE OF PRICES EXA-1 BASIS OF COMPENSATION CONTRACTOR will be paid the Contract Price according to the Schedule of Prices, and all other applicable terms and conditions of the Contract Documents. EXA-2 PROGRESS PAYMENTS Progress payments will be made in accordance with all applicable terms and conditions of the Contract Documents, including, but not limited to: 1. Contract Agreement – Section 11 – “Contract Price and Method of Payment;” 2. General Conditions – “Payment – General”; 3. General Conditions – “Payment – Applications for Payment”; 4. General Conditions – “Payment – Mobilization Payment Requirements;” 5. General Conditions – “Payment – Itemized Breakdown of Contract Lump Sum Prices”; 6. General Conditions – "Contract Price Adjustments and Payments”; 7. General Conditions – “Suspension of Payments”; 8. General Conditions – “OC SAN’s Right to Withhold Certain Amounts and Make Application Thereof”; and 9. General Conditions – “Final Payment.” EXA-3 RETENTION AND ESCROW ACCOUNTS A. Retention: OC SAN shall retain a percentage of each progress payment to assure satisfactory completion of the Work. The amount to be retained from each progress payment shall be determined as provided in General Conditions – “Retained Funds; Substitution of Securities”. In all contracts between CONTRACTOR and its Subcontractors and/or Suppliers, the retention may not exceed the percentage specified in the Contract Documents. C-EXA-062221 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 2 of 8 B. Substitution of Securities: CONTRACTOR may, at its sole expense, substitute securities as provided in General Conditions – “Retained Funds; Substitution of Securities.” Payment of Escrow Agent: In lieu of substitution of securities as provided above, the CONTRACTOR may request and OC SAN shall make payment of retention earned directly to the escrow agent at the expense of the CONTRACTOR. At the expense of the CONTRACTOR, the CONTRACTOR may direct the investment of the payments into securities consistent with Government Code §16430 and the CONTRACTOR shall receive the interest earned on the investments upon the same terms provided for in this article for securities deposited by the CONTRACTOR. Upon satisfactory completion of the Contract, the CONTRACTOR shall receive from the escrow agent all securities, interest and payments received by the escrow agent from OC SAN, pursuant to the terms of this article. The CONTRACTOR shall pay to each Subcontractor, not later than twenty (20) calendar days after receipt of the payment, the respective amount of interest earned, net of costs attributed to retention withheld from each Subcontractor, on the amount of retention withheld to ensure the performance of the Subcontractor. The escrow agreement used by the escrow agent pursuant to this article shall be substantially similar to the form set forth in §22300 of the California Public Contract Code. C. Release of Retention: Upon Final Acceptance of the Work, the CONTRACTOR shall submit an invoice for release of retention in accordance with the terms of the Contract. D. Additional Deductibles: In addition to the retentions described above, OC SAN may deduct from each progress payment any or all of the following: 1. Liquidated Damages that have occurred as of the date of the application for progress payment; 2. Deductions from previous progress payments already paid, due to OC SAN’s discovery of deficiencies in the Work or non-compliance with the Specifications or any other requirement of the Contract; 3. Sums expended by OC SAN in performing any of the CONTRACTOR’S obligations under the Contract that the CONTRACTOR has failed to perform, and; 4. Other sums that OC SAN is entitled to recover from the CONTRACTOR under the terms of the Contract, including without limitation insurance deductibles and assessments. CONFORMED C-EXA-062221 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 3 of 8 The failure of OC SAN to deduct any of the above-identified sums from a progress payment shall not constitute a waiver of OC SAN’s right to such sums or to deduct them from a later progress payment. EXA-4 STOP PAYMENT NOTICE In addition to other amounts properly withheld under this article or under other provisions of the Contract, OC SAN shall retain from progress payments otherwise due the CONTRACTOR an amount equal to one hundred twenty-five percent (125%) of the amount claimed under any stop payment notice under Civil Code §9350 et. seq. or other lien filed against the CONTRACTOR for labor, materials, supplies, equipment, and any other thing of value claimed to have been furnished to and/or incorporated into the Work; or for any other alleged contribution thereto. In addition to the foregoing and in accordance with Civil Code §9358 OC SAN may also satisfy its duty to withhold funds for stop payment notices by refusing to release funds held in escrow pursuant to public receipt of a release of stop payment notice executed by a stop payment notice claimant, a stop payment notice release bond, an order of a court of competent jurisdiction, or other evidence satisfactory to OC SAN that the CONTRACTOR has resolved such claim by settlement. EXA-5 PAYMENT TO SUBCONTRACTORS Requirements 1. The CONTRACTOR shall pay all Subcontractors for and on account of Work performed by such Subcontractors, not later than seven (7) days after receipt of each progress payment as required by the California Business and Professions Code §7108.5. Such payments to Subcontractors shall be based on the measurements and estimates made pursuant to article progress payments provided herein. 2. Except as specifically provided by law, the CONTRACTOR shall pay all Subcontractors any and all retention due and owing for and on account of Work performed by such Subcontractors not later than seven (7) days after CONTRACTOR’S receipt of said retention proceeds from OC SAN as required by the California Public Contract Code §7107. EXA-6 PAYMENT OF TAXES Unless otherwise specifically provided in this Contract, the Contract Price includes full compensation to the CONTRACTOR for all taxes. The CONTRACTOR shall pay all federal, state, and local taxes, and duties applicable to and assessable against any Work, including but not limited to retail sales and use, transportation, export, import, business, and special taxes. The CONTRACTOR shall ascertain and pay the taxes when due. The CONTRACTOR will maintain auditable records, subject to OC SAN reviews, confirming that tax payments are current at all times. C-EXA-062221 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 4 of 8 EXA-7 FINAL PAYMENT After Final Acceptance of the Work, as more particularly set forth in the General Conditions, “Final Acceptance and Final Completion”, and after Resolution of the Board authorizing final payment and satisfaction of the requirements as more particularly set forth in General Conditions – “Final Payment”, a final payment will be made as follows: 1. Prior to Final Acceptance, the CONTRACTOR shall prepare and submit an application for Final Payment to OC SAN, including: a. The proposed total amount due the CONTRACTOR, segregated by items on the payment schedule, amendments, Change Orders, and other bases for payment; b. Deductions for prior progress payments; c. Amounts retained; d. A conditional waiver and release on final payment for each Subcontractor (per Civil Code Section 8136); e. A conditional waiver and release on final payment on behalf of the CONTRACTOR (per Civil Code Section 8136); f. List of Claims the CONTRACTOR intends to file at that time or a statement that no Claims will be filed, g. List of pending unsettled claims, stating claimed amounts, and copies of any and all complaints and/or demands for arbitration received by the CONTRACTOR; and h. For each and every claim that resulted in litigation or arbitration which the CONTRACTOR has settled, a conformed copy of the Request for Dismissal with prejudice or other satisfactory evidence the arbitration is resolved. 2. The application for Final Payment shall include complete and legally effective releases or waivers of liens and stop payment notices satisfactory to OC SAN, arising out of or filed in connection with the Work. Prior progress payments shall be subject to correction in OC SAN’s review of the application for Final Payment. Claims filed with the application for Final Payment must be otherwise timely under the Contract and applicable law. 3. Within a reasonable time, OC SAN will review the CONTRACTOR’S application for Final Payment. Any recommended changes or corrections will then be forwarded to the CONTRACTOR. Within ten (10) calendar days after receipt of recommended changes from OC SAN, the CONTRACTOR will make the changes, or list Claims that will be filed as a result of the changes, and shall submit the revised application for Final Payment. Upon CONFORMED C-EXA-062221 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 5 of 8 acceptance by OC SAN, the revised application for Final Payment will become the approved application for Final Payment. 4. If no Claims have been filed with the initial or any revised application for Final Payment, and no Claims remain unsettled within thirty-five (35) calendar days after Final Acceptance of the Work by OC SAN, and agreements are reached on all issues regarding the application for Final Payment, OC SAN, in exchange for an executed release, satisfactory in form and substance to OC SAN, will pay the entire sum found due on the approved application for Final Payment, including the amount, if any, allowed on settled Claims. 5. The release from the CONTRACTOR shall be from any and all Claims arising under the Contract, except for Claims that with the concurrence of OC SAN are specifically reserved, and shall release and waive all unreserved Claims against OC SAN and its officers, directors, employees and authorized representatives. The release shall be accompanied by a certification by the CONTRACTOR that: a. It has resolved all Subcontractors, Suppliers and other Claims that are related to the settled Claims included in the Final Payment; b. It has no reason to believe that any party has a valid claim against the CONTRACTOR or OC SAN which has not been communicated in writing by the CONTRACTOR to OC SAN as of the date of the certificate; c. All warranties are in full force and effect, and; d. The releases and the warranties shall survive Final Payment. 6. If any claims remain open, OC SAN may make Final Payment subject to resolution of those claims. OC SAN may withhold from the Final Payment an amount not to exceed one hundred fifty percent (150%) of the sum of the amounts of the open claims, and one hundred twenty-five percent (125%) of the amounts of open stop payment notices referred to in article entitled stop payment notices herein. 7. The CONTRACTOR shall provide an unconditional waiver and release on final payment from each Subcontractor and Supplier providing Work under the Contract (per Civil Code Section 8138) and an unconditional waiver and release on final payment on behalf of the CONTRACTOR (per Civil Code Section 8138) within thirty (30) days of receipt of Final Payment. EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT Notwithstanding OC SAN’s acceptance of the application for Final Payment and irrespective of whether it is before or after Final Payment has been made, OC SAN shall not be precluded from subsequently showing that: 1. The true and correct amount payable for the Work is different from that previously accepted; C-EXA-062221 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 6 of 8 2. The previously accepted Work did not in fact conform to the Contract requirements, or; 3. A previous payment or portion thereof for Work was improperly made. OC SAN also shall not be stopped from demanding and recovering damages from the CONTRACTOR, as appropriate, under any of the foregoing circumstances as permitted under the Contract or applicable law. CONFORMED C-EXA-062221 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 7 of 8 ATTACHMENT 1 – CERTIFICATION FOR REQUEST FOR PAYMENT I hereby certify under penalty of perjury as follows: That the claim for payment is in all respects true, correct; that the services mentioned herein were actually rendered and/or supplies delivered to OC SAN in accordance with the Contract. I understand that it is a violation of both the federal and California False Claims Acts to knowingly present or cause to be presented to OC SAN a false claim for payment or approval. A claim includes a demand or request for money. It is also a violation of the False Claims Acts to knowingly make use of a false record or statement to get a false claim paid. The term "knowingly" includes either actual knowledge of the information, deliberate ignorance of the truth or falsity of the information, or reckless disregard for the truth or falsity of the information. Proof of specific intent to defraud is not necessary under the False Claims Acts. I understand that the penalties under the Federal False Claims Act and State of California False Claims Act are non-exclusive, and are in addition to any other remedies which OC SAN may have either under contract or law. I hereby further certify, to the best of my knowledge and belief, that: 1. The amounts requested are only for performance in accordance with the Specifications, terms, and conditions of the Contract; 2. Payments to Subcontractors and Suppliers have been made from previous payments received under the Contract, and timely payments will be made from the proceeds of the payment covered by this certification; 3. This request for progress payments does not include any amounts which the prime CONTRACTOR intends to withhold or retain from a Subcontractor or Supplier in accordance with the terms and conditions of the subcontract; and 4. This certification is not to be construed as Final Acceptance of a Subcontractor’s performance. _________________________________________ Name _________________________________________ Title _________________________________________ Date C-EXA-062221 CONFORMED PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 8 of 8 ATTACHMENT 2 – SCHEDULE OF PRICES See next pages from the Bid Submittal Forms (Shimmick Construction Company, Inc.) BF-14 Schedule of Prices, Pages 1-2 Bid Submitted By: Shimmick Construction Company, Inc. (Name of Firm) BF-14 SCHEDULE OF PRICES INSTRUCTIONS A. B. General For Unit Prices, it is understood that the following quantities are approximate only and are solely for the purpose of estimating for the comparison of Bids and that the actual value of Work will be computed based upon the actual quantities in the completed Work, whether they be more or less than those shown. CONTRACTOR'S compensation for the Work under the Contract Documents will be computed based upon the lump sum amount of the Contract at time of award, plus any additional or deleted costs approved by OC SAN via approved Change Orders, pursuant to the Contract Documents. Bidder shall separately price and accurately reflect costs associated with each line item, leaving no blanks. Any and all modifications to the Bid must be initialed by an authorized representative of the Bidder in accordance with the Instructions to Bidders, Preparation of Bid. Bidders are reminded of section entitled Discrepancies in Bid Items in the Instructions to Bidders, which, in summary, provides that the total price for each item shall be based on the Unit Price listed for each item multiplied by the quantity; and the correct Total Price for each item shall be totaled to determine the Total Amount of Bid. All applicable costs including overhead and profit shall be reflected in the respective unit costs and the TOTAL AMOUNT OF BID. The BicLpnce^hali include all costs to complete the Work, including profit, overhead, etc., unless otherwise specified in the Contract Documents. All applicable sales taxes, state and/or federal taxes, and any other special taxes, patent rights, or royalties shall be included in the prices Quoted in this Bid. Basis of Award AWARD OF THE CONTRACT WILL BE MADE ON THE BASIS OF THE LOWEST RESPONSIVE AND RESPONSIBLE BID. Note 1: Base Bid. Includes all costs necessary to furnish all labor, materials, equipment, and services for the construction of the Project per the Contract Documents. BF-14 SCHEDULE OF PRICES C-BF-101424 PROJECT NO. J-98 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 1 of 2 DO~n 4 ^^mas0-n5Iw .?%K > s , N ) I1 m^aII^II t 11 § I l l ^ g K I>0c 0- n "0 1w0- nI \ w s N3 CO .° 3 s ^ j l i l a 2 . § ^ 0 0 T3 S ° , 9 I l l o - 5 ^ . 0 s 3 g- U1 ^ ^ 0 U1 s, 3 T3 0; : " ^ 3 = : Q) -< 3 ? a ; a . ^ ^ - s g (D 0 0 s. Crt 3 0 (D ST . c g. ^ . § Is - ' 3 -0^ § - 8 3<D ° . 3 0 -5 ? i =a 3 03 s- 55 - 1 ^ 1 cn " . N- 3 (D ° - f Q - s. Q) g 0 CT> a - 0- =3 0 ) = : • d 0 s- s w Q< Q ^ ^ 3 2. (D 03 a?w 3 = h (/ > CD (D 3 a a. 1 3: Q . m. 3 a . <D 6 ^ 0 a 5 ' - o T3 3: w a 0 0 Q 03 (D (D 0 (D 0 0. 1 5 •o (Q c 0 s. (D eg 3 c (D 0 0 "! 3 - o ' a . ?.. CD u> 3. 5 <LT w a . =1 3 2 3 § 8 ^ (D 5T n (D s. B) 0) =- . 5 3 ' o - - < oa a . 9, -0 Q: 0 - ' 3 3 <D EB U) 0 (U Q. — 3 (D 0 s- a . n =t l 3. 03 c 0 0 (D - 3 3 3 3 Q) a Q. f f Cfl 03 =* . (D T3 CD ^ - i 0 0 cn 0) ST 3 c ? 03 cn ^ 3 ^ 3 s' 03 c Q . W <D - 0 T3 u g - a s- 01 Q) 0 01 §. < 3 ' ? 0- =i CD (D Q . 01 =3 g= - ^ o °, 3 3 3 Q . s 0 ) a (D S ? ( D -0 s- Q - w 3 a? . w = 3 a : U) 03 3 c c 3 3 c 3 T3 -0 •u 3 0) 03 a> s, 3 c c 3 3 3 5 > e ? ^ s m c3.7 s II II w w> « ) u U1 U1 p p 0 0 0 0 0 0 0 B:70 ' <B ^0 ) m TOa^[ "wis - IiI I t f l 1 0 I I |m1 0 1 c Is | 0 l" n 1" 0 1^ 3 | o |m10 ) z | i l S< 1 3 1 I I sQ . II <<^= T 33 7 T p0= 3 ^I I 3p0 I I t <30 5/27/2025 1 Electrical Power Distribution System Improvements, Project No. J-98 Presented by: Mike Dorman, Director of Engineering Operations Committee June 4, 2025 Construction Contract Award Plant No. 1 - Normal Power 2 Utility Primary Treatment Preliminary Treatment Water Solids Secondary Treatment Digesters Thickening & Dewatering Truck Loading Trickling Filters Activated Sludge Normal Power CenGen: 5MW Plant Load: 11MW CenGen 1 2 5/27/2025 2 Plant No. 1 - Loss of Utility 3 Utility Primary Treatment Preliminary Treatment Water Solids Secondary Treatment Digesters Thickening & Dewatering Truck Loading Trickling Filters Activated Sludge CenGen: 5MW Plant Load: 11MW CenGen will be overloaded and shut downNormal Power CenGen Plant No. 1 - Loss of Utility 4 Utility Primary Treatment Preliminary Treatment Water Solids Secondary Treatment Digesters Thickening & Dewatering Truck Loading Trickling Filters Standby Generators Activated Sludge CenGen: 5MW Plant Load: 11MW CenGen will be overloaded and shut down Standby Power CenGen 3 4 5/27/2025 3 Plant No. 1 - Loss of Utility 5 Utility Primary Treatment Preliminary Treatment Water Solids Secondary Treatment Digesters Thickening & Dewatering Truck Loading Trickling Filters Standby Generators Activated Sludge CenGen Power Standby Power CenGen:7.5MW Plant Load: 11MW CenGen Arc Flash Reduction •Arc Flash can occur if equipment has a fault •Arc Flash Reduction: •Enhance O&M safety •Equipment protection ARC-FLASH PROTECTION SYSTEM MEDIUM-VOLTAGE SWITCHGEAR 12KV-480V TRANSFORMER LOW-VOLTAGE SWITCHGEAR 6 Reduce trip time to reduce arc flash energy 5 6 5/27/2025 4 •Plant-wide load shedding system with a substationnetwork •Plant-wide arc flash reduction •Speakers and strobes to warn staff of breaker switching •Surge protection devices in 19 existing switchgear and motor control centers Plant No. 1 Improvements 7 Replace aged and obsolete protective relays Plant No. 2 Improvements 8 Distribution Center A •Monitoring and control •Replace relays Power Building B •Monitoring and control •Replace relays •Arc flash mitigation •Replace aged transformers EPSA and Headworks Standby Power Buildings: •Upgrade existing grounding system •Add portable load bank connections Power Building D •Demo transformer, generator,fuel tank and automatic transfer switch •Feed from new adjacent Distribution Center F EPSA = Effluent Pump Station Annex 7 8 5/27/2025 5 Standby Generator Load Testing 9 Load Bank Multiple 2,000kW Standby Generators 12kV Switchgear 12kV-480V Transformer Portable Equipment Needed for Generator Load Testing Standby Generator Load Testing 10 Load Bank Multiple 2,000kW Standby Generators 12kV Switchgear 12kV-480V Transformer Portable Cable Connection Cabinet Portable Equipment Needed for Generator Load Testing 9 10 5/27/2025 6 Bid Results 11 $ 13,200,000Engineer’s Estimate AmountBidder $ 24,352,127Shimmick Construction Company, Inc. $ 25,700,000Helix Electric, Inc. $ 27,654,892LEED Electric, Inc. $ 36,203,000Mass Electric Construction Company Lowest 3 bids within 13% of each other Engineer’s Estimate Difference 12 84%Total Percent Difference % DifferenceDescription 153%Site and Civil 90%Electrical and Instrumentation 84%Switchgear Modifications 44%Electrical Equipment 77%General Conditions 11 12 5/27/2025 7 Recommendation 13 Recommend to the Board of Directors to: A. Receive and file Bid Tabulation and Recommendation for Electrical Power Distribution System Improvements, Project No. J-98; B. Award a Construction Contract Agreement to Shimmick Construction Company, Inc., for Electrical Power Distribution System Improvements, Project No. J-98, for a total amount not to exceed $24,352,127; and C. Approve a contingency of $2,435,213 (10%). Questions? 14 13 14 OPERATIONS COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4328 Agenda Date:6/25/2025 Agenda Item No:8. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS, PROJECT NO. J-98 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: A. Approve a Professional Construction Services Agreement with Brown and Caldwell to provide construction support services for Electrical Power Distribution System Improvements, Project No. J-98, for a total amount not to exceed $2,667,874; and B. Approve a contingency of $266,787 (10%). BACKGROUND Brown and Caldwell were selected as part of a competitive,qualifications-based solicitation process to design Electrical Power Distribution System Improvements,Project No.J-98.At the time of the solicitation,the Orange County Sanitation District (OC San)documented its intent to award a subsequent agreement to the design consultant for continuation of engineering services during construction. This project will implement a load shedding system and arc flash mitigation system at Plant No.1 (similar to Project No.J-117B at Plant No.2),to extend the load shedding system and arc flash mitigation system to Distribution Center A at Plant No.2 and provide electrical power monitoring and control improvements,add portable load bank connections and grounding system improvements at the Headworks and Effluent Pump Station Annex (EPSA)standby generation facilities,and replace aged transformers at Power Building B. RELEVANT STANDARDS ·Comply with California Government Code Section 4526 to engage the best qualified firm “on the basis of demonstrated competence and qualifications”and “negotiate fair and reasonable fees” ·24/7/365 treatment plant reliability ·Ensure the public’s money is wisely spent Orange County Sanitation District Printed on 6/18/2025Page 1 of 3 powered by Legistar™ File #:2025-4328 Agenda Date:6/25/2025 Agenda Item No:8. PROBLEM This project requires the design consultant to provide as-needed services during construction including submittal review,responding to the Contractor’s requests for information,reviewing construction change orders,participating in meetings,attending site visits,preparation of standard operating procedures, providing startup assistance, and preparing record drawings PROPOSED SOLUTION Approve a Professional Construction Services Agreement with the design consultant,Brown and Caldwell, to provide engineering support services during construction. TIMING CONCERNS Engineering support services will be required at the start of construction.Construction is anticipated to start in July 2025. RAMIFICATIONS OF NOT TAKING ACTION The engineering support services needed to facilitate and review construction activities would not be available from the Engineer of Record, which may negatively impact the contract execution. PRIOR COMMITTEE/BOARD ACTIONS February 2020 -Approved a Professional Design Services Agreement with Brown and Caldwell to provide engineering services for the Electrical Power Distribution System Improvements,Project No. J-98, for an amount not to exceed $2,240,000 and approved a contingency of $224,000 (10%). ADDITIONAL INFORMATION Brown and Caldwell have successfully furnished engineering services for the design of this project and their support services during construction will provide continuity through the completion of the project. Staff negotiated with Brown and Caldwell for these support services in accordance with OC San’s adopted policies and procedures.A review of the proposed price was conducted using estimated quantities of requests for information,submittals,meetings,site visits,change order review,and design revisions, as well as the level of effort for preparing record drawings. Based on this review,staff determined the negotiated fee to be fair and reasonable for these services.Staff are requesting a 10 percent contingency in case unanticipated professional services are needed during construction. CEQA The project is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations section 15301.A Notice of Exemption has been filed with the OC Clerk- Recorder. Orange County Sanitation District Printed on 6/18/2025Page 2 of 3 powered by Legistar™ File #:2025-4328 Agenda Date:6/25/2025 Agenda Item No:8. FINANCIAL CONSIDERATIONS This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2024-25 and 2025-26,Section 8,Page 48,Electrical Power Distribution System Improvements,Project No.J-98)and an increase to the project budget is being requested as part of the annual budget update.The approval of this agreement will be contingent upon approval of the increased project budget as part of the budget update adoption. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Professional Construction Services Agreement ·Presentation TW:lb Orange County Sanitation District Printed on 6/18/2025Page 3 of 3 powered by Legistar™ PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 1 of 20 PROFESSIONAL CONSTRUCTION SERVICES AGREEMENT This PROFESSIONAL CONSTRUCTION SERVICES AGREEMENT, (hereinafter referred to as “Agreement”), is made and entered into to be effective the 25th day of June, 2025 by and between the ORANGE COUNTY SANITATION DISTRICT, (hereinafter referred to as "OC SAN"), and BROWN AND CALDWELL, (hereinafter referred to as "CONSULTANT"). WITNESSETH: WHEREAS, OC SAN desires to engage CONSULTANT to provide construction support services for ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS, PROJECT NO. J-98 (Construction Support Services); and WHEREAS, CONSULTANT is qualified to provide the necessary services for the Construction Support Services in connection with these requirements; and WHEREAS, OC SAN has adopted procedures in accordance with OC SAN’s current Purchasing Ordinance, Section 4.03(B), for the continuation of services and has proceeded in accordance with said procedures to perform the Construction Support Services; and WHEREAS, at its regular meeting on June 25, 2025 the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee or Director of Engineering and General Manager pursuant to OC SAN’s current Purchasing Ordinance to approve this Agreement. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows: 1. SCOPE OF WORK CONSULTANT agrees to furnish necessary professional and technical services to accomplish those project elements outlined in the Scope of Work attached hereto as "Attachment A", and by this reference made a part of this Agreement. A. The CONSULTANT shall be responsible for the professional quality, technical accuracy, completeness, and coordination of all design, drawings, specifications, and other services furnished by the CONSULTANT under this Agreement, including the work performed by its subconsultants (Subconsultants). Where approval by OC SAN is indicated, it is understood to be conceptual approval only and does not relieve the CONSULTANT of responsibility for complying with all laws, codes, industry standards and liability for damages caused by errors, omissions, noncompliance with industry standards, and/or negligence on the part of the CONSULTANT or its Subconsultants. B. CONSULTANT is responsible for the quality of work prepared under this Agreement and shall perform its work in accordance with generally accepted engineering standards in effect for clarity, uniformity, and completeness. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 2 of 20 C. In the event that work is not performed to the satisfaction of OC SAN and does not conform to the requirements of this Agreement or any applicable industry standards, the CONSULTANT shall, without additional compensation, promptly correct or revise any errors or deficiencies in its designs, drawings, specifications, or other services within the timeframe specified by the Project Engineer/Project Manager. OC SAN may charge to CONSULTANT all costs, expenses and damages associated with any such corrections or revisions. D. All CADD drawings, figures, and other work shall be produced by CONSULTANTS and Subconsultants using OC SAN standard software. Conversion of CADD work from any other non-standard CADD format to OC SAN format shall not be acceptable in lieu of this requirement. Electronic files shall be subject to an acceptance period of thirty (30) calendar days during which OC SAN shall perform appropriate acceptance tests. CONSULTANT shall correct any discrepancies or errors detected and reported within the acceptance period at no additional cost to OC SAN. E. All professional services performed by the CONSULTANT, including but not limited to all drafts, data, correspondence, proposals, reports, and estimates compiled or composed by the CONSULTANT, pursuant to this Agreement, are for the sole use of OC SAN, its agents and employees. Neither the documents nor their contents shall be released to any third party without the prior written consent of OC SAN. This provision does not apply to information that (a) was publicly known, or otherwise known to the CONSULTANT, at the time that it was disclosed to the CONSULTANT by OC SAN, (b) subsequently becomes publicly known to the CONSULTANT other than through disclosure by OC SAN. F. OC SAN shall furnish to the CONSULTANT available studies, reports, and other data pertinent to the CONSULTANT’s services; obtain or authorize the CONSULTANT to obtain or provide additional reports and data as required; and furnish to the CONSULTANT services of others required for the performance of the CONSULTANT’s services hereunder. The CONSULTANT shall be entitled to use and rely upon all such information and services provided by OC SAN or others in performing the CONSULTANT’s services under this Agreement. G. Neither OC SAN nor CONSULTANT shall not be considered in default of this Agreement for delays in performance caused by circumstances beyond it’s the reasonable control of the non-performing party. For purposes of this Agreement, such circumstances include, but are not limited to, (1) strikes, lockouts, work slowdowns or stoppages, or accidents, and (2) acts of God. Should such circumstances occur, the non-performing party shall, within a reasonable time of being prevented from performing, give written notice to the other party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement. 2. COMPENSATION Total compensation shall be paid to CONSULTANT for the Construction Support Services in accordance with the following provisions: PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 3 of 20 A. Total Compensation Total compensation shall be in an amount not to exceed Two Million Six Hundred Sixty-Seven Thousand Eight Hundred Seventy-Four Dollars ($2,667,874). Total compensation to CONSULTANT including burdened labor (salaries plus benefits), overhead, profit, direct costs, and Subconsultant(s) fees and costs shall not exceed the sum set forth in Attachment “E” - Fee Proposal. B. Labor As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus benefits) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this project. C. Overhead As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall compensate CONSULTANT and Subconsultants for overhead at the rate equal to the percentage of burdened labor as specified in Attachment “E” - Fee Proposal. D. Profit Profit for CONSULTANT and Subconsultants shall be a percentage of consulting services fees (Burdened Labor and Overhead). When the consulting or subconsulting services amount is $250,000 or less, the maximum Profit shall be 10%. Between $250,000 and $2,500,000, the maximum Profit shall be limited by a straight declining percentage between 10% and 5%. For consulting or subconsulting services fees with a value greater than $2,500,000, the maximum Profit shall be 5%. Addenda shall be governed by the same maximum Profit percentage after adding consulting services fees. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this project according to Attachment “E” - Fee Proposal. E. Subconsultants For any Subconsultant whose fees for services are greater than or equal to $100,000 (excluding out-of-pocket costs), CONSULTANT shall pay to Subconsultant total compensation in accordance with the Subconsultant amount specified in Attachment “E” - Fee Proposal. For any Subconsultant whose fees for services are less than $100,000, CONSULTANT may pay to Subconsultant total compensation on an hourly rate PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 4 of 20 basis and as specified in the Scope of Work. OC SAN shall pay to CONSULTANT the actual costs of Subconsultant fees and charges in an amount not to exceed the sum set forth in Attachment “E” - Fee Proposal. F. Direct Costs OC SAN shall pay to CONSULTANT and Subconsultants the actual costs of permits and associated fees, travel and licenses for an amount not to exceed the sum set forth in Attachment “E” - Fee Proposal. OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN. Upon request, CONSULTANT shall provide to OC SAN receipts and other documentary records to support CONSULTANT’s request for reimbursement of these amounts, see Attachment “D” – Allowable Direct Costs. All incidental expenses shall be included in overhead pursuant to Section 2 - COMPENSATION above. G. Other Direct Costs Other Direct Costs incurred by CONSULTANT and its Contractor due to modifications to the Scope of Work resulting from field investigations and field work required by the Agreement. These items may include special equipment, test equipment and tooling and other materials and services not previously identified. Refer to attachment “D” Allowable Direct Costs for payment information. H. Reimbursable Direct Costs OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this Agreement. The reimbursement of the above-mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at https://www.gsa.gov/travel/plan-book/per-diem-rates. The CONSULTANT shall be responsible for the most economical and practical means of management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN. Travel and travel arrangements – Any travel involving airfare, overnight stays or multiple day attendance must be approved by OC SAN in advance. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 5 of 20 Local Travel is considered travel by the CONSULTANT within OC SAN general geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel. Lodging – Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN. Travel Meals – Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per-diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals. Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this Agreement. I. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services described in CONSULTANT’s Proposal will exceed the not-to-exceed amount of the Agreement, including approved additional compensation, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this Agreement. 3. REALLOCATION OF TOTAL COMPENSATION OC SAN, by its Director of Engineering, shall have the right to approve a reallocation of the incremental amounts constituting the total compensation, provided that the total compensation is not increased. 4. PAYMENT A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period. CONSULTANT shall allocate costs in the same manner as it would for payment requests as described in this Section of the Agreement. CONSULTANT shall warrant and certify the accuracy of these costs and understand that submitted costs are subject to Section 11 - AUDIT PROVISIONS. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 6 of 20 B. CONSULTANT may submit monthly or periodic statements requesting payment for those items included in Section 2 - COMPENSATION hereof in the format as required by OC SAN. Such requests shall be based upon the amount and value of the work and services performed by CONSULTANT under this Agreement and shall be prepared by CONSULTANT and accompanied by such supporting data, including a detailed breakdown of all costs incurred and work performed during the period covered by the statement, as may be required by OC SAN. Upon approval of such payment request by OC SAN, payment shall be made to CONSULTANT as soon as practicable of one hundred percent (100%) of the invoiced amount on a per task basis. If OC SAN determines that the work under this Agreement, or any specified task hereunder, is incomplete and that the amount of payment is in excess of: i. The amount considered by OC SAN’s Director of Engineering to be adequate for the protection of OC SAN; or ii. The percentage of the work accomplished for each task. OC SAN may, at the discretion of the Director of Engineering, retain an amount equal to that which ensures that the total amount paid to that date does not exceed the percentage of the completed work for each task or the project in its entirety. C. CONSULTANT may submit periodic payment requests for each 30-day period of this Agreement for the profit as set forth in Section 2 - COMPENSATION above. Said profit payment request shall be proportionate to the work actually accomplished to date on a per task basis. In the event OC SAN's Director of Engineering determines that no satisfactory progress has been made since the prior payment, or in the event of a delay in the work progress for any reason, OC SAN shall have the right to withhold any scheduled proportionate profit payment. D. Upon satisfactory completion by CONSULTANT of the work called for under the terms of this Agreement, and upon acceptance of such work by OC SAN, CONSULTANT will be paid the unpaid balance of any money due for such work, including any retained percentages relating to this portion of the work. E. Upon satisfactory completion of the work performed hereunder and prior to final payment under this Agreement for such work, or prior settlement upon termination of this Agreement, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this Agreement other than such claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein. F. Pursuant to the California False Claims Act (Government Code Sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this Agreement may be held liable for treble damages and up to a ten thousand dollars ($10,000) civil penalty for each false claim submitted. This Section shall also be binding on all Subconsultants. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 7 of 20 A CONSULTANT or Subconsultant shall be deemed to have submitted a false claim when the CONSULTANT or Subconsultant: a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by OC SAN; c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or e) is a beneficiary of an inadvertent submission of a false claim to OC SAN, and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim. 5. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES A. To the extent CONSULTANT's employees and/or Subconsultants who will perform work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section 1771.4, the work is subject to compliance monitoring and enforcement by the DIR. B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a) (3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776. C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations. D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulation Section 16461(e). 6. DOCUMENT OWNERSHIP – SUBSEQUENT CHANGES TO PLANS AND SPECIFICATIONS A. Ownership of Documents for the Construction Support Services performed. All documents, including but not limited to, original plans, studies, sketches, drawings, computer printouts and disk files, and specifications prepared in connection with or related to the Scope of Work or Construction Support Services, shall be the property of OC SAN. OC SAN’s ownership of these PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 8 of 20 documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed. OC SAN ownership entitlement arises upon payment or any partial payment for work performed and includes ownership of any and all work product completed prior to that payment. This Section shall apply whether the CONSULTANT’s Construction Support Services are terminated: a) by the completion of the Agreement, or b) in accordance with other provisions of this Agreement. Notwithstanding any other provision of this paragraph or Agreement, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer printouts and disk files, and specifications. B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the plans or specifications, where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service rendered by CONSULTANT was not a proximate cause of the damage. 7. INSURANCE A. General i. Insurance shall be issued and underwritten by insurance companies acceptable to OC SAN. ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Workers’ Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent. iii. Coverage shall be in effect prior to the commencement of any work under this Agreement. B. General Liability The CONSULTANT shall maintain during the life of this Agreement, including the period of warranty, commercial general liability insurance written on an occurrence basis providing the following minimum limits of liability coverage: One Million Dollars ($1,000,000) per occurrence with Two Million Dollars ($2,000,000) aggregate. If aggregate limits apply separately to this contract (as evidenced by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: premises-operations, products liability/completed operations (including any product manufactured or assembled), broad form property damage, contractual liability, independent contractors liability, personal and advertising injury, mobile equipment, vicarious PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 9 of 20 liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) must be included in the general liability policy and coverage must be reflected on the submitted certificate of insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor, or subcontractor performing work or rendering services on behalf of OC SAN in connection with the planning, development, and construction of the project. In all its insurance coverages related to the work, (except Errors and Omissions/Professional Liability), CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their officers, agents, or employees, or any other consultant, contractor, or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged. C. Umbrella Excess Liability The minimum limits of general liability and automobile liability insurance required, as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automobile liability. D. Automobile/Vehicle Liability Insurance The CONSULTANT shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: combined single limit of Five Hundred Thousand Dollars ($500,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement. E. Drone Liability Insurance If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of one million dollars ($1,000,000) in form acceptable to OC SAN. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 10 of 20 F. Workers’ Compensation Insurance The CONSULTANT shall provide such workers’ compensation insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including employer’s liability insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such workers’ compensation insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones Act claims. G. Errors and Omissions/Professional Liability CONSULTANT shall maintain in full force and effect, throughout the term of this Agreement, standard industry form professional negligence errors and omissions insurance coverage in an amount of not less than Five Million Dollars ($5,000,000) with limits in accordance with the provisions of this paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of five (5) years from the date of the completion of the services hereunder. In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of CONSULTANT during the course of performing services under the term of this Agreement. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis, said policy shall be continued in full force and effect during the term of this Agreement or until completion of the services provided for in this Agreement, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts of CONSULTANT during the course of performing services under the term of this Agreement. CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term. H. Proof of Coverage The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said certificates and endorsements shall conform to the requirements herein stated. All certificates PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 11 of 20 and endorsements are to be received and approved by OC SAN before work commences. CONSULTANT shall provide OC SAN with copies of its insurance certificates and amendatory endorsements affecting coverage. Confidential information may be redacted from said policies, provided that verification of coverage and name of carriers and agent/broker may not be redacted. Said policies and endorsements shall conform to the requirements herein stated. The following are approved forms that must be submitted as proof of coverage: • Certificate of Insurance ACORD Form or other equivalent certificate of insurance form • Additional Insurance (General Liability) The combination of (ISO Forms) CG 20 10 and CG 20 37 or equivalent All other additional insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN. • Additional Insured (Automobile Liability) Submit endorsement provided by carrier for OC SAN approval. • Waiver of Subrogation Submit workers’ compensation waiver of subrogation endorsement provided by carrier for OC SAN approval. • Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below. I. Cancellation and Policy Change Notice The CONSULTANT is required to notify OC SAN in writing of any insurance cancellation notice it receives or other knowledge of pending or actual insurance policy cancellation, within two (2) working days of receipt of such notice or acquisition of such knowledge. Additionally, the CONSULTANT is required to notify OC SAN in writing of any material change in the terms of insurance, including reduction in coverage, within two (2) working days of receipt of such notice or knowledge of same. Said notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Contracts, Purchasing & Materials Management Division PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 12 of 20 J. Primary Insurance The general and automobile liability policies shall contain a “Primary and Non-Contributory” clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT. K. Separation of Insured The general and automobile liability policies shall contain a “Separation of Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this Agreement, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property. M. Deductibles and Self-Insured Retentions Any deductible and/or self-insured retention must be declared to OC SAN on the certificate of insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses. OC SAN will not invoke the option expressed in this paragraph unless it has reasonable cause to question CONSULTANT’s financial strength. N. Defense Costs The general and automobile liability policies shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits. O. Subconsultants The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work. P. Limits Are Minimums If the CONSULTANT maintains higher limits than any minimums shown above, then OC SAN requires and shall be entitled to coverage for the higher limits maintained by CONSULTANT. Nothing in this section, however, requires CONSULTANT in the absence of litigation to reveal its Errors and Omissions/Professional Liability limits beyond that required above in Section 7. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 13 of 20 8. SCOPE CHANGES In the event of a change in the Scope of Work or other terms in the Agreement, as requested by OC SAN, the parties hereto shall execute an Amendment to this Agreement setting forth with particularity all terms of the new Agreement, including, but not limited to, any additional CONSULTANT's fees. CONSULTANT hereby agrees to use any and all procedures, programs, and systems required by OC SAN to process and execute such Amendment(s), including, but not limited to, computer programs and systems. 9. PROJECT TEAM AND SUBCONSULTANTS CONSULTANT shall provide to OC SAN, prior to execution of this Agreement, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used on this project by CONSULTANT. CONSULTANT shall include a description of the scope of work to be done by each Subconsultant and each CONSULTANT’s project team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant on a per task basis, broken down as indicated in Section 2 -COMPENSATION. There shall be no substitution of the listed Subconsultants and CONSULTANT’s project team members without prior written approval by OC SAN. 10. ENGINEERING REGISTRATION The CONSULTANT’s personnel are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered engineer but represents and agrees that wherever in the performance of this Agreement requires the services of a registered engineer, such services hereunder will be performed under the direct supervision of registered engineers. 11. AUDIT PROVISIONS A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this Agreement. The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this Agreement during the term of this Agreement and for a period of three (3) years after its termination. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 14 of 20 C. CONSULTANT shall maintain complete and accurate records in accordance with Generally Accepted Accounting Principles (GAAP). The CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all project related accounting records and documents, and any other financial data. 12. LEGAL RELATIONSHIP BETWEEN PARTIES The legal relationship between the parties hereto is that of an independent contractor and nothing herein shall be deemed to make CONSULTANT an employee of OC SAN. 13. NOTICES All notices hereunder and communications regarding the interpretation of the terms of this Agreement, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return receipt requested, postage prepaid. Notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT 18480 Bandilier Circle Fountain Valley, CA 92708 Attention: Wai Chan, Senior Contracts Administrator Copy: Todd Waltz, Project Manager Notices shall be mailed to CONSULTANT at: BROWN AND CALDWELL 18500 Von Karman Avenue, Suite 800 Irvine, CA 92612 Attention: Cherylle Barrido, PE Copy: Mike Puccio, PE All communication regarding the Scope of Work, will be addressed to the Project Manager. Direction from other OC SAN’s staff must be approved in writing by OC SAN’s Project Manager prior to action from the CONSULTANT. 14. TERMINATION OC SAN may terminate this Agreement at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination, CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination. OC SAN may also terminate this Agreement for cause but only after providing CONSULTANT written notice of the breach and a period of ten (10) days to cure. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 15 of 20 CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this Agreement, when the same are due. Notice of termination shall be mailed to OC SAN and/or CONSULTANT in accordance with Section 13 - NOTICES. 15. DOCUMENTS AND STUDY MATERIALS The documents and study materials for this project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, computation, and study materials in its files pertaining to the work described in this Agreement, which is requested in writing by OC SAN. 16. COMPLIANCE A. Labor CONSULTANT certifies by the execution of this Agreement that it pays employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all federal, state and local directives and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment. B. Air Pollution CONSULTANT and its subconsultants and subcontractors shall comply with all applicable federal, state and local air pollution control laws and regulations. C. Iran Contracting Act CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208). D. California Air Resources Board Mobile Source Regulations CONSULTANT and its subconsultants and subcontractors shall comply with the following California Air Resources Board Mobile Source Regulations: • Advanced Clean Fleet (ACF): 13 CCR 2013-2013.4; 13 CCR 2015-2015.6 • Truck & Bus Regulation (T&B): 13 CCR 2025 • Clean Truck Check (CTC): 13 CCR 2195-2199.1 • Off-Road Diesel Amendments (ORD): 13 CCR 2449-2449.2 PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 16 of 20 17. AGREEMENT EXECUTION AUTHORIZATION Both OC SAN and CONSULTANT do covenant that each individual executing this document by and on behalf of each party is a person duly authorized to execute agreements for that party. 18. DISPUTE RESOLUTION In the event of a dispute arising between the parties regarding performance or interpretation of this Agreement, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services. 19. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which it may be entitled. 20. PROGRESS REPORTS Monthly progress reports shall be submitted for review by the tenth day of the following month and must include as a minimum: 1) current activities, 2) future activities, 3) potential items that are not included in the Scope of Work, 4) concerns and possible delays, 5) percentage of completion, and 6) budget status. 21. WARRANTY CONSULTANT shall perform its services in accordance with generally accepted industry and professional standards. If, within the 12-month period following completion of its services, OC SAN informs CONSULTANT that any part of the services fails to meet those standards, CONSULTANT shall, within the time prescribed by OC SAN, take all such actions as are necessary to correct or complete the noted deficiency(ies). 22. INDEMNIFICATION To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN, which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, consultants, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses including without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or consultants fees and costs and OC SAN’s general and administrative expenses (individually, a “Claim”, or collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in carrying out its obligations under this Agreement to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 17 of 20 CONSULTANT’s suppliers, consultants, subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising from: (A) the sole or active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or (C) the independent action of a third party who is neither one of the Indemnified Parties nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, consultant, subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them. Exceptions (A) through (B) above shall not apply, and CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder. CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the provisions of this Agreement. Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this Agreement are contractual and the result of negotiation between the parties hereto. Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting party, shall not be employed in the interpretation of this Agreement. 23. DUTY TO DEFEND The duty to defend hereunder is wholly independent of and separate from the duty to indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code Section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims. Additionally, in no event shall the cost to defend charged to CONSULTANT exceed CONSULTANT’s proportionate percentage of fault. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 18 of 20 CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this Agreement until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 24. CONSULTANT PERFORMANCE The CONSULTANT’s performance shall be evaluated by OC SAN. A copy of the evaluation shall be sent to the CONSULTANT for comment. The evaluation, together with the comments, shall be retained by OC SAN and may be considered in future CONSULTANT selection processes. 25. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES CONSULTANT shall comply with all OC SAN policies and procedures, including, but not limited to, the Contractor Safety Standards, as applicable, and Human Resources Policies, all as may be amended from time to time. 26. CLOSEOUT When OC SAN determines that all work authorized under the Agreement is fully complete and that OC SAN requires no further work from CONSULTANT, or the Agreement is otherwise terminated or expires in accordance with the terms of the Agreement, OC SAN shall give the Consultant written notice that the Agreement will be closed out. CONSULTANT shall submit all outstanding billings, work submittals, deliverables, reports or similarly related documents as required under the Agreement within thirty (30) days of receipt of notice of Agreement closeout. Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the Agreement and will either: i. Give the CONSULTANT a final Agreement Acceptance: or ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in this Agreement. Such support must be provided within the timeframe requested by OC SAN. Notwithstanding the final Agreement Acceptance the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise); and the CONSULTANT shall remain obligated under all those provisions of the Agreement which expressly or by their nature extend beyond and survive final Agreement Acceptance. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 19 of 20 Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final Agreement Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or agreement with, the CONSULTANT’s request for final Agreement Acceptance. 27. CONSULTANT’S OPINION OF COSTS: OC SAN acknowledges that construction estimates, financial analyses and feasibility projections are subject to many influences including, but not limited to, price of labor and materials, unknown or latent conditions of existing equipment or structures, and time or quality of performance by third parties. OC SAN acknowledges that such influences may not be precisely forecasted and are beyond the control of CONSULTANT and that actual costs incurred may vary substantially from the estimates prepared by CONSULTANT. CONSULTANT does not warrant or guarantee the accuracy of construction or development cost estimates. 28. ENTIRE AGREEMENT This Agreement constitutes the entire understanding and agreement between the Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof. PCSA PROJECT NO. J-98 Revised 030525 ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS Page 20 of 20 IN WITNESS WHEREOF, this Agreement has been executed in the name of OC SAN and CONSULTANT by their respective duly authorized officers as of the day and year first written above. CONSULTANT: BROWN AND CALDWELL By __________________________________________________ Date __________________________________________________ Printed Name & Title ORANGE COUNTY SANITATION DISTRICT By __________________________________________________ Ryan P. Gallagher Date Board Chairman By __________________________________________________ Jackie Castro Date Assistant Clerk of the Board By __________________________________________________ Kevin Work Date Purchasing & Contracts Manager Attachments: Attachment “A” – Scope of Work Attachment “B” – Not Used Attachment “C” – Not Used Attachment “D” – Allowable Direct Costs Attachment “E” – Fee Proposal Attachment “F” – Not Used Attachment “G” – Not Attached Attachment “H” – Not Used Attachment “I” – Cost Matrix and Summary Attachment “J” – Not Used Attachment “K” – Not Used Attachment “L” – Contractor Safety Standards Attachment “M” – Not Attached Attachment “N” – Not Attached Attachment “O” – Human Resources Policies WC:ms ATTACHMENT “A” SCOPE OF WORK SCOPE OF WORK PROJECT NO. J-98 PCSA Page 1 of 16 ATTACHMENT “A” SCOPE OF WORK ELECTRICAL POWER DISTRIBUTION SYSTEM IMPROVEMENTS PROJECT NO. J-98 PROFESSIONAL CONSTRUCTION SERVICES AGREEMENT SCOPE OF WORK PROJECT NO. J-98 PCSA Page 2 of 16 TABLE OF CONTENTS I. SUMMARY..................................................................................................................................... 3 II. PROJECT SCHEDULE .................................................................................................................. 3 III. PROJECT IMPLEMENTATION....................................................................................................... 3 IV. PHASE 4 – CONSTRUCTION AND INSTALLATION SERVICES .................................................... 3 TASK 4.1 – PROJECT MANAGEMENT .................................................................................................. 3 4.1.1 – PMWeb Procedures (NOT USED) ................................................................................................ 5 TASK 4.2 – INITIAL PROJECT MEETINGS ............................................................................................ 5 4.2.1 – Construction Hand Off Workshop ................................................................................................. 5 4.2.2 – PMWeb and Submittal Review Procedures Meeting ...................................................................... 6 4.2.3 – Preconstruction Conference ......................................................................................................... 6 4.2.4 – Pre-Submittal Review Meetings and Workshops ........................................................................... 6 4.2.5 – Other Meetings and Workshops ................................................................................................... 6 TASK 4.3 – SUBMITTAL REVIEWS ........................................................................................................ 7 TASK 4.4 – REQUEST FOR INFORMATION .......................................................................................... 7 TASK 4.5 – CONTRACT DOCUMENT MODIFICATIONS, DESIGN CHANGES AND CHANGE ORDERS 8 TASK 4.6 – CONSTRUCTION PROGRESS MEETINGS AND SITE VISITS ............................................. 8 TASK 4.7 – STRUCTURAL ENGINEERING SERVICES .......................................................................... 9 TASK 4.8 – CONSULTANT LED TRAINING ........................................................................................... 9 TASK 4.9 – CONFORMED DOCUMENT PREPARATION ....................................................................... 9 V. PHASE 5 – COMMISSIONING SERVICES ..................................................................................... 9 TASK 5.1 – COMMISSIONING TEAM MEETINGS .................................................................................. 9 TASK 5.2 – FACILITY RECORDS DELIVERY SCHEDULE ................................................................... 10 TASK 5.3 – COMMISSIONING SUPPORT ............................................................................................ 11 TASK 5.4 – OPERATIONS AND MAINTENANCE MANUALS ............................................................... 12 TASK 5.5 – STANDARD OPERATING PROCEDURES (SOPS) ............................................................ 12 TASK 5.6 – REDLINE P&IDS AND SINGLE LINE DIAGRAMS (SLD) .................................................... 13 VI. PHASE 6 - CLOSEOUT ................................................................................................................ 14 TASK 6.1 – FINAL INSPECTION AND PUNCH LISTS .......................................................................... 14 TASK 6.2 – RECORD DRAWINGS ....................................................................................................... 14 TASK 6.3 – PROJECT MANAGEMENT ................................................................................................ 15 VII. STAFF ASSISTANCE .................................................................................................................. 16 VIII. QUANTITATIVE ASSUMPTIONS ................................................................................................. 16 SCOPE OF WORK PROJECT NO. J-98 PCSA Page 3 of 16 I. SUMMARY Provide construction engineering support services for the construction and installation, and closeout phases of this project. II. PROJECT SCHEDULE The schedule for the services specified in this Scope of Work (SOW) shall be provided per the construction contract schedule, and the schedule constraints as described in this Scope of Work. III. PROJECT IMPLEMENTATION All Orange County Sanitation District (OC SAN) projects are divided into six phases. The CONSULTANT shall provide engineering support services for Phase 4 Construction and Installation Services, Phase 5 Commissioning Services and Phase 6 Closeout. • Phase 1 – Project Development – Completed • Phase 2 – Preliminary Design – Completed • Phase 3 – Final Design – Completed • Phase 4 – Construction and Installation Services • Phase 5 – Commissioning Services • Phase 6 – Closeout IV. PHASE 4 – CONSTRUCTION AND INSTALLATION SERVICES OC SAN will administer and provide field inspection for the construction contract. Construction engineering support services shall be provided by the CONSULTANT as requested by OC SAN. The CONSULTANT shall provide the key project personnel as described in its proposal for this project. The CONSULTANT shall not reassign the key project personnel without prior approval of OC SAN. OC SAN may request reassignment of any of the CONSULTANT’s or its subconsultant’s personnel, based on poor performance. For all services, the CONSULTANT shall refer to the Engineering Design Guidelines, Chapter 01 for detailed requirements. Quality Assurance/Quality Control (QA/QC): The CONSULTANT shall administer a program of QA/QC procedures for producing quality work and shall effectively manage and control the work. Specific procedures shall include but not be limited to planning, coordination, tracking, checking, reviewing, and scheduling the work. The CONSULTANT shall subject all work products prepared by the CONSULTANT to the CONSULTANT’s in-house QA/QC procedures prior to submittal to OC SAN. QA/QC hours and costs shall be incorporated into other tasks within this SOW. TASK 4.1 – PROJECT MANAGEMENT A. The CONSULTANT shall be responsible for detailed management of the work, including managing its subconsultant’s, and shall keep OC SAN apprised of the status of the work. SCOPE OF WORK PROJECT NO. J-98 PCSA Page 4 of 16 B. The CONSULTANT shall conduct monthly project management meetings with OC SAN. These meetings shall be attended by OC SAN’s Project Manager and the CONSULTANT’s Project Manager at a mutually agreeable time. The purpose of the meetings shall be to review the CONSULTANT’s Project Manager’s progress report and the status of the SOW, budget, and any issues which may affect completion of the work. Meetings should be arranged so that the progress report can be submitted three days before each meeting. C. The CONSULTANT shall prepare and submit monthly invoices to OC SAN no later than the second Wednesday of the following month. The invoices shall document the hours and billing rate for each person that works on the project for each task in the work breakdown structure (WBS). Overhead, profit, and any direct costs shall also be shown for each task. As part of the summary section of the invoice, the CONSULTANT shall also include the following information: • Budget • Current billing period invoicing • Previous billing period “total invoiced to date” • Budget amount remaining • Current billing period “total percent invoice to date” • Current billing period “total percent completed to date” The monthly progress report shall be submitted with the invoice as part of the monthly request for payment. The monthly progress report shall include the following: • Work completed in the billing period • Outstanding project issues • Status and issues impacting project scope and budget • Percent complete, tabulated based on listed Part V. Quantitative Assumptions • Cost to complete, tabulated on a per task basis (ETC only needed when requested. Not monthly) • Overall project budget, tabulated on a per task basis • Travel and site visit summary • Log documenting work completed to date on requests for information (RFIs), submittal reviews, Master Document Index (MDI), and change order preparation • Log identifying and determining status of project risks • Out of scope items log D. The CONSULTANT shall also provide the percent budget spent for each of OC SAN’s WBS cost codes (i.e. by work package and phase). OC SAN will provide a list of cost codes by phase to the CONSULTANT. E. The CONSULTANT shall also provide a summary of progress and expenditures to date. F. OC SAN will provide a sample invoice structure to the CONSULTANT after the issuance of the Notice to Proceed (NTP) for this SOW. SCOPE OF WORK PROJECT NO. J-98 PCSA Page 5 of 16 4.1.1 – PMWeb Procedures (NOT USED) TASK 4.2 – INITIAL PROJECT MEETINGS 4.2.1 – Construction Hand Off Workshop A. The CONSULTANT shall participate in a two-hour construction hand-off workshop. The purpose of the workshop is for the CONSULTANT and the OC SAN design team to transfer project-specific knowledge to the OC SAN construction management and inspection staff who will be managing and monitoring construction. Agenda to be used at the meet is below: 1. General Project Overview a. Summary of Work and Project Elements b. Work Sequence c. Work Restrictions d. Schedule/Milestones 2. Project Risks (for example) a. Tricky construction b. Areas where extra care needs to be taken c. Submittals that need to be completed early due to lead time 3. Key decision log items (i.e. any key items/decisions discussed during design that cannot change, and we do not want to entertain proposals from the Contractor to change?) 4. Long lead time equipment submittals (timely processing required to avoid delays) a. Electrical control panels b. Transformers c. Special equipment d. Other project risk items 5. Project Team a. OC SAN Engineering Team b. CONSULTANT Team - involvement in Submittals & RFIs. c. Stakeholders- O&M-personnel 6. Contractor a. Subs b. Bid price issues (e.g., did they bid anything suspiciously low) c. Past Contractor performance at OC SAN d. Strengths e. Weaknesses 7. LDs 8. Status of PMWeb Submittals List and set up SCOPE OF WORK PROJECT NO. J-98 PCSA Page 6 of 16 B. The workshop will be led by OC SAN’s Project Manager and Project Engineer and the CONSULTANT’s Project Manager and Project Engineer. 4.2.2 – PMWeb and Submittal Review Procedures Meeting A. The CONSULTANT shall participate in a two-hour PMWeb procedure meeting and submittal procedure meeting. The purpose of this meeting is to review the roles and logistics for review and acceptance of construction contract documents and Contractor submittals. The CONSULTANT’s Project Manager and Project Engineer shall attend. This meeting will be led by the OC SAN Resident Engineer and will be more specific to this contract than the overall PMWeb training identified in Section 4.1.1. B. The project will utilize PMWeb for submittal reviews, project communication, tracking, and management. When required by OC SAN, paper documents shall also be provided. C. The CONSULTANT shall develop the Construction Submittal Items List in accordance with EXHIBIT 4 - MASTER PMWEB SCHEDULE OF SUBMITTALS TEMPLATE prior to the Contractor’s NTP. The CONSULTANT shall participate in (1) two-hour PMWeb Submittal List creation meeting. The purpose of this meeting is to review the submittal list template and the process of creating a project specific submittal list. The CONSULTANT shall account for (2) additional one-hour meetings to review their progress with OC SAN. 4.2.3 – Preconstruction Conference A. The CONSULTANT shall participate in a two-hour preconstruction conference attended by OC SAN staff, the CONSULTANT, the Contractor, subcontractors, and vendors. This meeting will be scheduled and presided over by OC SAN. In this meeting, OC SAN’s Resident Engineer will describe the CONSULTANT’s role in the project as the Design Engineer and the services the CONSULTANT shall provide during construction. OC SAN will prepare meeting minutes, and the CONSULTANT shall review and comment on the minutes. Only the Project Manager and Lead Project Engineer shall attend. 4.2.4 – Pre-Submittal Review Meetings and Workshops A. The CONSULTANT shall attend pre-submittal review meetings (2-hour virtual meetings unless noted otherwise) specified for the following specification sections: • 01120, Work Sequence • 01140, Work Restrictions • 01810, Commissioning • 16340, Medium Voltage Switchgear • 16430, Low Voltage Switchgear • 16850, Load Shed and Substation Local Area Network Hardware • Additional pre-submittal meetings (2 meetings @ 2-hour each) OC SAN will prepare the agenda and meeting minutes, and the CONSULTANT shall review and comment on the minutes. The CONSULTANT’s Project Manager, Project Engineer, and technical lead shall attend in-person. 4.2.5 – Other Meetings and Workshops SCOPE OF WORK PROJECT NO. J-98 PCSA Page 7 of 16 Risk Workshops: The CONSULTANT shall facilitate two workshops (3 hours each) to review project risks with OC SAN construction staff and Contractor. The first Risk Workshop will include: identification of construction risks and reviewing risk triggers. The second Risk Workshop will include strategies for mitigating risks. CONSULTANT shall prepare workshop meeting materials, agenda and draft/final minutes. The deliverable of the workshops is a risk management plan to be implemented by the OC SAN Resident Engineer through the course of the project. TASK 4.3 – SUBMITTAL REVIEWS OC SAN will receive all submittals from the Contractor through PMWeb. OC SAN will forward submittals requiring the CONSULTANT’s review to the CONSULTANT via PMWeb. The CONSULTANT shall review the submittals for conformance with the requirements of the Contract Documents and provide review comments to OC SAN through PMWeb within ten (10) calendar days after receipt of a submittal. When a submittal is of a complete system, complex piece of equipment, or deemed necessary by the CONSULTANT, the CONSULTANT may request that OC SAN extend the CONSULTANT’S submittal review period. The CONSULTANT shall return comments to OC SAN allowing enough time for OC SAN to incorporate all comments into a combined review comment set that OC SAN will return to the Contractor. The CONSULTANT shall accommodate occasional expedited reviews for time-sensitive submittals. Submittals shall include but not be limited to shop drawings, vendor tests, certifications, and test reports. All submittals will be made available electronically (PDF) through PMWeb. If the CONSULTANT has staff other than the assigned technical lead review submittals, the CONSULTANT's technical lead shall review all submittal comments prior to returning them to OC SAN. For all submittals reviewed by the CONSULTANT, the CONSULTANT shall assume that they are the only reviewer for that submittal review and shall not rely on supplemental OC SAN comments. If a deviation is requested in the submittal, CONSULTANT shall review the deviation against the design and provide a response as to compliance of the submitted item. CONSULTANT shall not defer the review or decision to OC SAN. See Section V - Quantitative Assumptions in this SOW for the estimated number of submittals. TASK 4.4 – REQUEST FOR INFORMATION OC SAN will forward to the CONSULTANT certain Requests for Information (RFIs) generated by the Contractor or OC SAN. The CONSULTANT shall return written responses to OC SAN as soon as possible or within three (3) business days of receipt of the RFIs, clarifying the requirements of the Contract Documents. The CONSULTANT shall generate necessary sketches, figures, and modifications to the drawings for clarification. When required to avoid schedule delay or additional construction-related costs, the CONSULTANT shall expedite the review of time sensitive RFIs. If any changes to the Contract Documents are required, the CONSULTANT shall prepare these documents and submit them as PDF files to OC SAN. The CONSULTANT shall update all AutoCAD drawings and specifications upon OC SAN acceptance of any changes resulting from RFIs and change orders. SCOPE OF WORK PROJECT NO. J-98 PCSA Page 8 of 16 See Section V- Quantitative Assumptions in this SOW for the estimated number of RFIs. TASK 4.5 – CONTRACT DOCUMENT MODIFICATIONS, DESIGN CHANGES AND CHANGE ORDERS If the Contract Documents require modifications due to changed conditions, OC SAN requested changes, omissions, or design errors; the CONSULTANT shall prepare preliminary change order documents and forward them to OC SAN, as needed. OC SAN shall review the preliminary change order documents and request the CONSULTANT to incorporate any changes. OC SAN will issue the change order documents in a formal Request for Proposal (RFP) or Field Change Order (FCO) to the Contractor. The CONSULTANT shall forward design calculations and other design backup documents as necessary to OC SAN. Any Contract Document that requires changes shall be identified with the date of change and reference (RFI number, RFP number, FCO number, etc.) shown on the document. Changes shown on the drawings shall be clearly marked and “clouded” for accurate identification of the scope of the change to the Contractor and inspection staff. The CONSULTANT shall maintain up-to-date Contract Documents. When a change is required on a Contract Drawing that has previously undergone a change, the updated drawing showing the previous change shall be used as the base document to identify new changes. The CONSULTANT shall submit complete change documentation to OC SAN for use in RFIs, RFPs, and FCOs. This change documentation shall include drawings, schematics, details, schedules, and specifications, as required. The CONSULTANT shall prepare cost estimates for the changes by OC SAN. The CONSULTANT shall provide details, description and justification for the change. The CONSULTANT shall maintain a Master Document Index (MDI) to track all changes issued on the project. The MDI shall be updated monthly and located in PMWeb. See Section V- Quantitative Assumptions in this SOW for the estimated number of hours. TASK 4.6 – CONSTRUCTION PROGRESS MEETINGS AND SITE VISITS The CONSULTANT shall attend construction progress meetings, as requested by OC SAN’s Resident Engineer. The CONSULTANT’s Project Manager and Project Engineer shall attend. The scope shall include the time for travel, follow-up, and review of meeting minutes. Construction progress meeting minutes will be prepared by OC SAN. The CONSULTANT shall attend or be available by phone for one-hour weekly construction progress meetings. The CONSULTANT shall make field visits to assist in field problem resolution and design clarification/verification to help resolve construction issues as they arise and as requested by OC SAN. The CONSULTANT shall report the nature of the field site visits, the problem resolved and identify staff requesting the site visit in the CONSULTANT’s monthly project report. The CONSULTANT shall assume 150 field visits are needed. OC SAN will provide project inspection, except as required in other sections of this SOW. SCOPE OF WORK PROJECT NO. J-98 PCSA Page 9 of 16 See Section V- Quantitative Assumptions in this SOW for the estimated number of hours. TASK 4.7 – STRUCTURAL ENGINEERING SERVICES The CONSULTANT shall have the structural engineer of record conduct field visits, as requested by OC SAN’s Resident Engineer, to provide expert opinion in review of observation of the structural work associated with the project. California Building Code requires the structural engineer of record to perform structural inspections during construction. TASK 4.8 – CONSULTANT LED TRAINING CONSULTANT shall lead trainings to cover the modifications and additions completed by the project. The training material should include items such as project overview, the design intent/purpose, SCADA use, process parameters, critical maintenance tasks, operational philosophy, and different modes of operation. The preferred platform to conduct these trainings is in Microsoft Teams (one class session should be recorded). In-person classes maybe coordinated depending on the topic/needs. Assume 3 training classes, 2 sessions (on different days) for each class, for the following areas: 1. Low Voltage Switchgear Modifications 2. Medium Voltage Switchgear Modifications 3. Local Shed and Substation LAN Systems All training shall be completed prior to the start of the Contractor RATS. A draft training agenda, draft presentation slides and any handouts shall be submitted to OC SAN not less than 60-days prior to the required training date. OC SAN will schedule the training with the required OC SAN staff. Within 30-days of all trainings being completed, the CONSULTANT shall submit all final training materials and video recordings to the Maintenance Department and the PM Optimization group. TASK 4.9 – CONFORMED DOCUMENT PREPARATION Within four (4) weeks of notice to proceed, prepare conformed documents set (drawings, databases, specifications, and other required materials) that incorporates all addenda. See Engineering Design Guidelines, Chapter 01, Design Guidelines – General Requirements, Section 1.5 “Preparation of Project Deliverables” for requirements as modified in Section V of this Scope of Work, “Project-Specific Deviations from OCSD Design Guidelines” and the requirements of the CAD Manual). V. PHASE 5 – COMMISSIONING SERVICES TASK 5.1 – COMMISSIONING TEAM MEETINGS The CONSULTANT shall attend Commissioning Team meetings at OC SAN’s request. The scope includes time for meeting preparation, follow-up, and review of meeting minutes. Commissioning team meeting minutes shall be prepared by OC SAN. The CONSULTANT will review and comment on OC SAN’s prepared meeting minutes. See SCOPE OF WORK PROJECT NO. J-98 PCSA Page 10 of 16 Section V- “Quantitative Assumptions” in this Scope of Work for the number of meetings. TASK 5.2 – FACILITY RECORDS DELIVERY SCHEDULE The CONSULTANT shall provide the facility records highlighted in green in the table below. These facility records are organized by when they are due to OC SAN O&M. All other facility records are by Contractor. For all Facility Records that originate in CAD format, the Contractor may choose to markup changes in using CAD software. Under this condition, assume they will not adhere to OC SAN CAD standards. CONSULTANT shall convert the changes to meet OC SAN CAD standards when making the updates. Construction NTP Pre-commissioning Beneficial Occupancy Final Completion After Final Completion ESM (draft individual) ESM (final individual) ESM (as-built individual) EID (conformed to bid) EID (final) SCOPE OF WORK PROJECT NO. J-98 PCSA Page 11 of 16 Construction NTP Pre-commissioning Beneficial Occupancy Final Completion After Final Completion SLD (conformed to bid) SLD (redline for baseline) P&ID (conformed to bid) P&ID (redline for baseline) O&M Manual (draft) O&M Manual1 SOPs (draft photos and graphics) SOPs (final photos and graphics)1 CONSULTANT training and training manuals Vendor training and training manuals PCI training Spare parts and tools Loop drawings Completed commissioning procedures Test results Electronic CAD files Electronic config. files All remaining facility records Record Drawings 1. Documents should be submitted as draft at least six weeks prior to Contractor’s scheduled Beneficial Occupancy. Final documents shall be available at Beneficial Occupancy. TASK 5.3 – COMMISSIONING SUPPORT The CONSULTANT shall provide assistance to OC SAN for the commissioning of all systems within the scope of this project. Prior to the commissioning of a system, the SCOPE OF WORK PROJECT NO. J-98 PCSA Page 12 of 16 CONSULTANT shall meet with OC SAN commissioning staff to review the design and the commissioning procedures. The CONSULTANT shall be available to help troubleshoot during commissioning, during RAT, and to prepare operation manuals. This may require the preparation of scope for change requests, RFI responses. And submittal reviews that result from commissioning preparation and startup. The CONSULTANT services shall consist of a series of on-site visits to participate in the development of the commissioning procedures. The CONSULTANT shall witness the testing of the existing functionality of the switchgear protection and transfer schemes prior to retrofitting of the existing switchgears. The CONSULTANT shall witness the ORT, FAT and RAT and document any deviations from the prepared procedures, failures, and anomalies during the testing, and report any activities negatively impacting the operation of equipment to OC SAN. See Section V- “Quantitative Assumptions” in this SOW for the estimated number of site visits. TASK 5.4 – OPERATIONS AND MAINTENANCE MANUALS The CONSULTANT shall review existing OC SAN Operations and Maintenance (O&M) Manuals and determine which require replacement or modification. The CONSULTANT shall develop the new and revised O&M Manuals as required. The format will be based on previous O&M Manuals with content additions and revisions as defined in Exhibit 1, “OC SAN Revised O&M Manual TOC” spreadsheet. This spreadsheet includes a corresponding reference to the P2-66 O&M Manual for a content example. When an example is not provided, that indicates that new content has been added to the table of contents. The Equipment Controls portion of the O&M Manual has been revised to include a Shutdowns and Alarms Table versus separate paragraphs for interlocks and alarms. Exhibit 2, “P2-66 Ch05 Influent Pump Station (Revised)” Word document provides an example of these changes. Exhibit 3, “O&M Manual, Equipment Controls - Shutdowns and Alarms Tables” spreadsheet can be used to develop these tables in Excel and then transfer them into the Word documents. The O&M Manual shall be illustrated with photos, tables, diagrams and schematics as appropriate. The draft O&M Manuals shall be submitted to OC SAN for review at least 45 days prior to commencement of the CONSULTANT led training. This assumes a 30-day OC SAN review period, at which point OC SAN 's comments shall be forwarded to the CONSULTANT. The CONSULTANT shall incorporate the necessary changes into the Draft O&M Manual for startup. During startup and testing the Draft O&M Manual shall be considered a "living document", with changes being recorded by the CONSULTANT and OC SAN, based on operating experience. The Final O&M Manual shall be submitted with Beneficial Occupancy. TASK 5.5 – STANDARD OPERATING PROCEDURES (SOPS) The CONSULTANT shall develop four (4) new and revise twelve (12) existing SOPs for switchgear to be modified or installed, and the new load bank connections. The CONSULTANT shall present the finalized SOPs to OC SAN Operation and Maintenance staff prior to RAT. During the RAT process, SOPs might be modified based on comments from OC SAN. SCOPE OF WORK PROJECT NO. J-98 PCSA Page 13 of 16 Draft SOPs shall be submitted to OC SAN prior to the start of ORT and the final SOPs shall be submitted with beneficial occupancy of each facility. Allow for one additional revision after the Draft SOP. The SOPS shall be submitted to OC SAN as MS Word files, and OC SAN will configure SharePoint where the Word files and Vendor Manuals are managed. The following existing SOPs will require revisions (12 total): Plant 1 1. ESC 2. CenGen 3. Blower Building 1 4. Blower Building 2 5. Power Building 6 6. Power Building 7 7. Power Building 8 8. Power Building 9 9. Steve Anderson Lift Station 10. Thickening and Dewatering Plant 2 1. Distribution Center A 2. Power Building B TASK 5.6 – REDLINE P&IDS AND SINGLE LINE DIAGRAMS (SLD) The CONSULTANT shall develop interim redline P&IDs and SLDs for OC SAN to use as an interim facility baseline during construction and includes up to approximately 46 SLDs and 90 P&IDs. The redline drawings shall include all changes made during construction and shall represent the as-built condition of the facilities. OC SAN will transmit to the CONSULTANT the Contractor’s markups of these documents. CONSULTANT shall utilize Contractor markups for RFIs, Change Orders, Contractor Submittals, Contractor loop check, and inspector markups to create the redline P&IDs and SLDs. For changes to existing facilities, OC SAN will provide the CONSULTANT a copy of the most recent Facility Record drawing to redline at the start of commissioning. Redline shall be accomplished using a PDF markup program, such as Bluebeam or AutoCAD and redline markups shall resemble the look and feel of the as-built P&ID. Summary notes describing the changes, images of RFI responses, or other such markups will not be accepted. Each redline drawing shall include a stamp containing “INTERIM CONSTRUCTION UPDATE” information (Project #, Date, Inspector Name, Phone, and Email) in RED. Below is an example of the stamp. SCOPE OF WORK PROJECT NO. J-98 PCSA Page 14 of 16 The CONSULTANT shall submit the redline P&IDs and SLDs with beneficial occupancy of each facility. This interim deliverable does not relieve the CONSULANT from providing the as-built P&IDs and SLDs with the Final Record Drawings, see Task 6.2. VI. PHASE 6 - CLOSEOUT Closeout tasks include completion of punch list work by the Contractor, final inspection, completion of Record Drawings, and electronic data. The CONSULTANT shall submit a final invoice at the completion of the project. TASK 6.1 – FINAL INSPECTION AND PUNCH LISTS The CONSULTANT’s Project Engineer, and discipline leads shall attend the final inspection job walk with the Contractor and OC SAN staff. The CONSULTANT shall make recommendations on the completion of the work including, but not limited to, completion of punch list items, site cleanup, and SWPPP. The CONSULTANT shall assist OC SAN in developing punch lists of items required to be completed prior to final acceptance of the project by OC SAN. See Section V- Quantitative Assumptions in this SOW for the estimated number of hours. TASK 6.2 – RECORD DRAWINGS Draft Record Drawings (total of 343 Record Drawings) shall be submitted to OC SAN within 60 workdays of receipt from OC SAN of the approved Contractor’s As-Built Drawings. The final Record Drawings shall be submitted within 21 workdays of receipt of OC SAN’s comments on the Draft Record Drawings. When requested by OC SAN, the CONSULTANT shall attend preliminary as-built meetings with OC SAN and the Contractor to inspect the Contractor’s draft as-built drawings to verify that the Contractor has included all relevant information from approved change orders and RFIs. As part of the review process, the CONSULTANT shall verify that the Contractor’s draft as-built drawings correctly reflect the information included in the approved shop drawings, RFIs, approved FCOs, plan clarifications, plan changes, and other deviations from the conformed Contract Documents, and that the information in the as-built drawings is complete. Based on the findings, the CONSULTANT shall prepare a written report on the completeness of the field markup set. The CONSULTANT shall allow for three meetings/visits to review the Contractor’s in progress as-built drawings, it is anticipated these meetings will occur when the first RAT is completed, when the construction is 75% complete and before the draft final as- built set. SCOPE OF WORK PROJECT NO. J-98 PCSA Page 15 of 16 The CONSULTANT shall independently keep a CAD ready set of draft as-built drawings throughout the project. After each meeting with the Contractor, the CONSULTANT shall transpose the Contractor’s information to the CONSULTANT’s draft CAD ready as-built drawings. The CONSULTANT shall be responsible for marking-up any differences between the Contractor’s draft as-built drawings and the CONSULTANT’s set. After final completion of the project, OC SAN will transmit to the CONSULTANT the Contractor’s final as-built drawings. At that time, the CONSULTANT shall meet with OC SAN’s inspectors and Resident Engineer to receive and review the Contractor’s final as- built drawings for completeness. The CONSULTANT shall prepare Draft Record Drawings based on the final as-built drawings for all drawings in accordance with the requirements in the CAD Manual. Traffic control plans and temporary bracing of shoring will not be updated. The CONSULTANT shall submit the Draft Record Drawings to the OC SAN Resident Engineer. The Draft Record Drawings will be reviewed for content and CAD compliance by OC SAN staff. A comment log will be returned to the CONSULTANT and, if any comments are generated, the CONSULTANT shall revise the Record Drawings and resubmit to the OC SAN Resident Engineer for review of the changes and acceptance of the Record Drawings. When no additional comments are identified, the CONSULTANT shall prepare the Final Record Drawings and submit them in accordance with the OC SAN CAD Manual Chapter 12. All hard copies of the Contractor’s final as-built drawings shall be returned to OC SAN at this same time. All Record Drawings shall contain a stamp indicating: The stamp shall be placed in the title block and may be included by x-ref. In addition, a note shall be placed over the engineer’s seal stating that “This drawing was originally approved for construction by [name of engineer] on [date] and sealed by [name of engineer] a licensed professional engineer in the State of California No. [License number] “. The CONSULTANT shall submit an electronic copy of the Record Drawings to OC SAN for review and acceptance. The acceptance of the Record Drawings shall be deemed a condition precedent for completion of the services provided in Phase 6 - Closeout. The Contractor-generated as-built drawings described in the Engineering Design Guidelines and the shop drawings will not be updated by the CONSULTANT. The format and quantities for delivery of the submittals shall be as listed below: Contents Draft Record Drawings Final Record Drawings Hard Copy Sets None None All related electronic files, including CAD and compiled PDFs Transmit Electronic Files to OC SAN Transmit Electronic Files to OC SAN TASK 6.3 – PROJECT MANAGEMENT The CONSULTANT shall also include project management support man-hours related to “Record Drawings These record drawings have been prepared based on information provided by others. The Engineer has not verified the accuracy of this information and shall not be responsible for any errors or omissions which may be herein as a result.” SCOPE OF WORK PROJECT NO. J-98 PCSA Page 16 of 16 closeout activities per requirements stated in Phase 4, Project Management Task. VII. STAFF ASSISTANCE The OC SAN staff member or designee assigned to work with the CONSULTANT on the construction phase of this project is Todd Waltz at (714) 593-7117, email to: twaltz@ocsan.gov. VIII. QUANTITATIVE ASSUMPTIONS The assumptions listed in the following table below shall be the basis for the assumed level of effort. Task Description Assumption 4.1 Project Management 47 months duration from the effective date of the NTP for this SOW (44 months in Phases 4 and 5 and 3 months in Phase 6) 4.1.1 PMWeb Procedures Meeting Prep and attend one (1) 2-hour meeting 4.2.1 Construction Hand-off Meeting PM + PE: Prep and attend one (1) 2-hour meeting 4.2.2 PMWeb Submittal Procedures Meeting PM+PE: Attend one (1) 2-hour meeting Construction Submittal Items List: Attend one (1) 2-hour + (2) 1-hour meetings 4.2.3 Preconstruction Conference PM + PE: Attend one (1) 2-hour meeting 4.2.4 Pre-Submittal Review Meetings and Workshops PM + PE+ Technical Lead: Attend eight (8) 2-hour meetings 4.2.5 Risk Workshops PM + PE : Attend two (2) 3-hour workshops 4.3 Submittals 150 – Original submittals items1 120 – Resubmittal items 80 – 3rd and later resubmittal items 4.4 Requests for Information 320 RFIs 4.5 Contract Document Modifications, Design Changes and Change Orders 900 hours 4.6 Construction Progress Meetings Site Visits During Construction 176 Progress Meetings @ 1 hour each 88 Site Visits @ 2 hours each 5.1 Commissioning Team Meetings 50 meetings of 2-hour duration each 5.3 Commissioning Support 500 hours 6.1 Final Inspection & Punch Lists 200 hours 1Note that each submittal set includes multiple submittal items which may be individually submitted by the Contractor. The counts listed in this table are considering the individual submittal items. The level of effort should assume these all are received individually. 5/28/2025 1 Electrical Power Distribution System Improvements, Project No. J-98 Presented by: Mike Dorman, Director of Engineering Operations Committee June 4, 2025 Professional Construction Services Agreement Award Construction Support Services: •Submittals reviews •Request for information (RFIs) •Construction meetings and site visits •Field changes •OC San training •Record drawings Additional Support Services: •O&M Manual •Standard Operating Procedures (SOPs) •Redline single line diagrams and instrumentation drawings (P&IDs) Construction Support Services 2 1 2 5/28/2025 2 Recommend to the Board of Directors to: A.Approve a Professional Construction Services Agreement with Brown and Caldwell to provide construction support services for Electrical Power Distribution System Improvements, Project No. J-98, for a total amount not to exceed $2,667,874; and B. Approve a contingency of $266,787 (10%). Recommendation 3 Questions? 4 3 4 ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4342 Agenda Date:6/25/2025 Agenda Item No:9. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: GANN APPROPRIATIONS LIMIT FOR FISCAL YEAR 2025-26 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Adopt Resolution No.OC SAN 25-03,entitled:“A Resolution of the Board of Directors of the Orange County Sanitation District Establishing the Annual Appropriations Limit for Fiscal Year 2025-26 for the Orange County Sanitation District in Accordance with the Provisions of Division 9 of Title 1 of the California Government Code”. BACKGROUND This routine annual action adopts a resolution establishing the spending limit for “proceeds of taxes” in accordance with Article XIII B of the Constitution of the State of California (Section 7910 of the Government Code).The Orange County Sanitation District’s (OC San)annual appropriations are well below the limit. In 1979,Proposition 4 (the Gann Initiative)was approved,adding Article XIII B to the State Constitution.The provisions of this article place limits on the amount of revenue that can be appropriated by all entities of government.This initiative was designed to constrain government expenditures by placing an annual limit on jurisdictions'revenue and appropriation growth.The Appropriations Limit is based on actual appropriations during the 1978-1979 fiscal year,as increased each year using specified population and inflationary growth factors.This annual growth allowance is linked to changes in population and cost of living.The passage of Proposition 111 in June 1990 amended Article XIII B,making changes in the base year upon which the Appropriations Limit is based,establishing new cost of living factors and new population factors for use by local governments,and increasing appropriations not subject to the limit (primarily qualified capital outlay projects).The financial constraints of Article XIII B apply to the State,all cities,counties,special districts, and all other political subdivisions. RELEVANT STANDARDS ·Produce Operations and CIP budgets every two years, with annual update Orange County Sanitation District Printed on 6/18/2025Page 1 of 2 powered by Legistar™ File #:2025-4342 Agenda Date:6/25/2025 Agenda Item No:9. PROBLEM Article XIII B of the State Constitution places limits on the amount of revenue that can be appropriated by all entities of government. PROPOSED SOLUTION Approval of the proposed Resolution establishing the annual Appropriations Limit for fiscal year 2025- 26 in accordance with the Provisions of Division 9 of Title 1 of the California Government Code. TIMING CONCERNS The proposed two-year budget,effective July 1 of this year,will be finalized and presented to the Board for adoption in June.The Appropriations Limit Resolution needs to be adopted in conjunction with the budget. RAMIFICATIONS OF NOT TAKING ACTION OC San will not be able to carry out its financial fiduciary duties beyond June 30, 2025. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Proposed Resolution No. OC SAN 25-03 Orange County Sanitation District Printed on 6/18/2025Page 2 of 2 powered by Legistar™ OC SAN 25-03-1 RESOLUTION NO. OC SAN 25-03 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE ORANGE COUNTY SANITATION DISTRICT ESTABLISHING THE ANNUAL APPROPRIATIONS LIMIT FOR FISCAL YEAR 2025-26 FOR THE ORANGE COUNTY SANITATION DISTRICT IN ACCORDANCE WITH THE PROVISIONS OF DIVISION 9 OF TITLE 1 OF THE CALIFORNIA GOVERNMENT CODE WHEREAS, Article XIII B of the Constitution of the State of California as proposed by the Initiative Measure approved by the people at the special statewide election held on November 6, 1979, provides that the total annual appropriations limit of each local government agency shall not exceed the appropriations limit of such entity for the prior year, adjusted for changes in the cost of living and population, except as otherwise specifically provided for in said Article; and, WHEREAS, the State Legislature added Division 9 (commencing with Section 7900) to Title 1 of the Government Code of the State of California to implement Article XIII B of the California Constitution; and, WHEREAS, Section 7910 of the Government Code provides that each year the governing body of each local jurisdiction shall, by resolution, establish its appropriations limit for the following fiscal year pursuant to Article XIII B at a regularly-scheduled meeting or a noticed special meeting and that fifteen (15) days prior to such meeting, documentation used in the determination of the appropriations limit shall be available to the public; and, WHEREAS, Section 7902 (a) of the Government Code sets forth the method for determining the appropriations limit for each local jurisdiction for the 2023-24 fiscal year; and, WHEREAS, the Board of Directors wishes to establish the appropriations limit for fiscal year 2025-26 for the Orange County Sanitation District. NOW, THEREFORE, the Board of Directors of the Orange County Sanitation District DOES HEREBY RESOLVE, DETERMINE AND ORDER: Section 1: That it is hereby found and determined that the documentation used in the determination of the appropriations limit for the Orange County Sanitation District, for fiscal year 2025-26, was available to the public in the Finance Department of said Orange County Sanitation District at least fifteen (15) days prior to this date. OC SAN 25-03-2 Section 2: That the appropriations limit for fiscal year 2025-26 for the Orange County Sanitation District, as established in accordance with Section 7902(b) of the California Government Code is $151,435,847. The budgeted appropriations from proceeds of taxes is within this maximum authorized spending limitation for fiscal year 2025-26. Section 3: That the Board of Directors of the Orange County Sanitation District, has determined that the percent change in California per capita personal income from the preceding year would be the cost of living factor to be used and the weighted average population change of the cities within the Orange County Sanitation District would be the population factor to be used in calculating the Orange County Sanitation District's appropriations limit for the fiscal year 2025-26. Section 4: The determination of the appropriation limit is based upon the best and most complete information available at this time. The Orange County Sanitation District reserves the right to review and re-establish a new and different limit in the event that it subsequently determines that a modification of the limitation amount is appropriate. PASSED AND ADOPTED at a regular meeting of the Board of Directors held June 25, 2025. Ryan P. Gallagher Board Chairman ATTEST: Jackie Castro, CMC Assistant Clerk of the Board OC SAN 25-03-3 STATE OF CALIFORNIA ) ) ss COUNTY OF ORANGE ) I, Jackie Castro, Assistant Clerk of the Board of Directors of the Orange County Sanitation District, do hereby certify that the foregoing Resolution No. OC SAN 25-03 was passed and adopted at a regular meeting of said Board on the 25th day of June 2025, by the following vote, to wit: AYES: NOES: ABSTENTIONS: ABSENT: IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of Orange County Sanitation District this 25th day of June 2025. Jackie Castro, CMC Assistant Clerk of the Board of Directors Orange County Sanitation District ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4343 Agenda Date:6/25/2025 Agenda Item No:10. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: FY 2025-26 USE CHARGES FOR SANTA ANA WATERSHED PROJECT AUTHORITY GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Adopt Resolution No.OC SAN 25-04,entitled:“A Resolution of the Board of Directors of the Orange County Sanitation District Establishing Use Charges for the 2025-26 Fiscal Year Pursuant to the Wastewater Treatment and Disposal Agreement with the Santa Ana Watershed Project Authority (“SAWPA”)”. BACKGROUND Currently,the Orange County Sanitation District (OC San)invoices SAWPA on a quarterly basis for the wastewater discharge received from the Santa Ana River Interceptor (SARI)line.Annually,the rates for flow,BOD,and TSS are calculated based upon the fiscal year budget for treatment and disposal costs and the 1996 Wastewater Treatment and Disposal Agreement.The rates calculated for each constituent for FY 2025-26 for wastewater discharge are: FLOW $307.66 per million gallons of flow BOD $414.76 per thousand pounds TSS $520.39 per thousand pounds The FY 2025-26 rates are an average 4.8 percent increase from the FY 2024-25 rates due to an increase in the treatment and disposal costs in the proposed FY 2025-26 Budget.These rates are separate from the rates charged for additional capacity purchases by SAWPA. RELEVANT STANDARDS ·Comply with OC San Policy - Establishing Annual SAWPA Treatment and Disposal Rates ·Support of 1996 Treatment and Disposal Agreement with SAWPA TIMING CONCERNS Rates should be effective July 1, 2025 (FY 2025-26). Orange County Sanitation District Printed on 6/18/2025Page 1 of 2 powered by Legistar™ File #:2025-4343 Agenda Date:6/25/2025 Agenda Item No:10. RAMIFICATIONS OF NOT TAKING ACTION Rates would not be established for FY 2025-26 for cost recovery for treatment and disposal of SAWPA’s wastewater discharge. PRIOR COMMITTEE/BOARD ACTIONS A resolution is adopted annually in June pursuant to the Wastewater Treatment and Disposal Agreement with SAWPA. ADDITIONAL INFORMATION The FY 2025-26 proposed budget to operate,maintain,and manage OC San’s sewage collection, treatment,and disposal system is $246.4 million,an increase of approximately 3.5 percent,or $8.3 million,from the prior year budget.The Operating Budget increase is primarily driven by increased outside contractual,utility,and personnel costs.Inflation that has impacted the nation’s economy over the past year is also driving up OC San’s cost of doing business. CEQA N/A FINANCIAL CONSIDERATIONS N/A ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Proposed Resolution No. OC SAN 25-04 Orange County Sanitation District Printed on 6/18/2025Page 2 of 2 powered by Legistar™ OC SAN 25-04-1 RESOLUTION NO. OC SAN 25-04 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE ORANGE COUNTY SANITATION DISTRICT ESTABLISHING USE CHARGES FOR THE 2025-26 FISCAL YEAR PURSUANT TO THE WASTEWATER TREATMENT AND DISPOSAL AGREEMENT WITH THE SANTA ANA WATERSHED PROJECT AUTHORITY (“SAWPA”) WHEREAS, the Board of Directors has approved the Wastewater Treatment and Disposal Agreement with the SANTA ANA WATERSHED PROJECT AUTHORITY (“SAWPA”); and, WHEREAS, said agreement provides for payment of Disposal Costs for the measured and sampled flow of Wastewater discharged from SAWPA’s SARI Service Area to Districts’ facilities; and, WHEREAS, said agreement provides for adjustment of said Disposal Costs on an annual basis. NOW, THEREFORE, The Board of Directors of the Orange County Sanitation District, DOES HEREBY RESOLVE, DETERMINE, AND ORDER: Section 1. That pursuant to Section C4 of the Wastewater Treatment and Disposal Agreement, the 2025-26 fiscal year charges for Disposal Costs are hereby established as follows: For Flow: $ 307.66 per million gallons of flow For Biochemical Oxygen Demand: $ 414.76 per thousand pounds For Total Suspended Solids: $ 520.39 per thousand pounds PASSED AND ADOPTED at a regular meeting of the Orange County Sanitation District’s Board of Directors held June 25, 2025. ___________________________ Ryan P. Gallagher Board Chairperson ATTEST: ___________________________ Jackie Castro, CMC Assistant Clerk of the Board OC SAN 25-04-2 STATE OF CALIFORNIA ) ) ss COUNTY OF ORANGE ) I, Jackie Castro, Assistant Clerk of the Board of Directors of the Orange County Sanitation District, do hereby certify that the foregoing Resolution No. OC SAN 25-04 was passed and adopted at a regular meeting of said Board on the 25th day of June 2025, by the following vote, to wit: AYES: NOES: ABSTENTIONS: ABSENT: IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of Orange County Sanitation District this 25th day of June 2025. Jackie Castro, CMC Assistant Clerk of the Board of Directors Orange County Sanitation District ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4344 Agenda Date:6/25/2025 Agenda Item No:11. FROM:Robert Thompson, General Manager Originator: Lan C. Wiborg, Director of Environmental Services SUBJECT: ORANGE COUNTY WASTE AND RECYCLING WASTE DISPOSAL AGREEMENT,AMENDMENT NO. 2 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve Amendment No.2 of the OC Waste and Recycling Waste Disposal Agreement,extending the initial term of the Agreement from June 30,2025 to June 30,2026,for a total amount not to exceed $748,000 which includes the unit price per ton for solid waste disposal and the associated escalation costs. BACKGROUND Since 2013,OC Waste and Recycling (OCWR)has been providing Orange County Sanitation District (OC San)with a low-cost,in-county option to properly dispose up to 50 tons per day (tpd)of solid waste generated from the grit,screenings,and drying beds from both Plant Nos.1 and 2,which is currently transported to the Frank Bowerman Landfill (Bowerman)located in the city of Irvine.In addition,OCWR provides a fail-safe option for the potential disposal of biosolids at the Prima Deshecha Landfill (Prima)located in the city of San Juan Capistrano when OC San’s biosolids cannot be beneficially used. OCWR proposes a one-year extension of the existing Waste Disposal Agreement (WDA)from June 30,2025 to June 30,2026.As part of the extension,the landfill disposal fee will increase by 2.6%, from $42.65 to $43.76 per ton,in accordance with the escalation formula in the current WDA.This extension allows continued access to OCWR’s landfill services under existing terms while negotiations continue with a long-term successor agreement. OCWR recently sent the Orange County Sanitation District (OC San)a proposed amendment to the WDA.The extension will enable OC San to fully assess future cost impacts,infrastructure needs, and regulatory requirements associated with OCWR’s proposal. RELEVANT STANDARDS ·Maintain and adhere to appropriate internal planning documents (2023 Strategic Plan, 2017 Biosolids Master Plan, etc.) Orange County Sanitation District Printed on 6/18/2025Page 1 of 3 powered by Legistar™ File #:2025-4344 Agenda Date:6/25/2025 Agenda Item No:11. ·Sustain 1, 5, 20-year planning horizons ·Maintain collaborative and cooperative relationships with regulators, stakeholders, and neighboring communities ·Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard PROBLEM OC San’s current WDA with OCWR is expiring on June 30,2025,and an amended agreement is needed to routinely haul solid waste (grit,screenings,drying bed materials and/or any biosolids that cannot be beneficially used) to the various in-county landfills. PROPOSED SOLUTION Approve Amendment No.2 of the WDA extending the initial term of the Agreement from June 30, 2025, to June 30, 2026. TIMING CONCERNS OC San will need the WDA executed and processed before the June 30,2025 expiration date to ensure there is no lapse with the current agreement. RAMIFICATIONS OF NOT TAKING ACTION If the amendment is not approved,OC San may not have a way to dispose of the solid waste (grit, screenings,drying bed materials,etc.)produced at Plant Nos.1 and 2.While alternative options may include transporting and disposing of the waste at landfills in other counties/states,this would pose logistical challenges and significant cost increases.Furthermore,in the event that disposal services are not available,screening and grit waste would back up and foul OC San’s treatment systems. Onsite long-term storage of this waste would present a public health risk. PRIOR COMMITTEE/BOARD ACTIONS June 2015 -Approved Amendment No.1 of the OC Waste Recycling Waste Disposal Agreement, extending the initial term of the Agreement from June 30, 2020 to June 30, 2025. November 2012 -Approved a Waste Disposal Agreement with the County of Orange (Orange County Waste and Recycling)for the County to receive and dispose of the Orange County Sanitation District’s biosolids at the Prima Deshecha Landfill,subject to available capacity,for the period commencing on December 1,2012 through June 30,2020,with a renewal option of 10-years in a total annual amount not to exceed $3,605,288. ADDITIONAL INFORMATION N/A Orange County Sanitation District Printed on 6/18/2025Page 2 of 3 powered by Legistar™ File #:2025-4344 Agenda Date:6/25/2025 Agenda Item No:11. CEQA N/A FINANCIAL CONSIDERATIONS This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been budgeted (Budget FY 2024-25 and 2025-26 Line item:Section 6,Page 5)and the budget is sufficient for this action. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Amendment No. 2 Orange County Sanitation District Printed on 6/18/2025Page 3 of 3 powered by Legistar™ Page 1 of 4 SECOND AMENDMENT TO WASTE DISPOSAL AGREEMENT Between THE COUNTY OF ORANGE, CALIFORNIA and the ORANGE COUNTY SANITATION DISTRICT June 30, 2025 County Amendment Authorization Date: _________________, 2025 County Notice Address: Director, OC Waste & Recycling 601 N. Ross Street 5th Floor Santa Ana, CA 92701 Orange County Sanitation District Amendment Authorization Date: ____________________, 2025 Orange County Sanitation District Notice Address: 18480 Bandilier Circle Fountain Valley, CA 92708 Page 2 of 4 SECOND AMENDMENT TO WASTE DISPOSAL AGREEMENT THIS SECOND AMENDMENT TO THE WASTE DISPOSAL AGREEMENT (“Second Amendment”) is made and dated as of the date indicated on the cover page hereof between the County of Orange, a political subdivision of the State of California (the “County”), and the Orange County Sanitation District, a county sanitation district duly existing under the laws of the State of California (the “District”). County and District may be referred to as “Party” individually or “Parties” when referred to jointly. RECITALS The County owns, manages, and operates a Waste Infrastructure System to manage municipal and solid waste generated within Orange County, California or imported from outside Orange County, California pursuant to contractual agreements (hereafter used referred to as “Disposal System” or “Waste Infrastructure System”). The Waste Infrastructure System collectively includes active Class III sanitary landfills (“County Landfills”), resource recovery, recycling and organics programs, infrastructure and operations, and regional household hazardous waste collection centers and other waste management related systems as may be deemed necessary by the County. The County is also responsible for the long-term management of 20 closed landfills as required under Applicable Law. County Landfills are used for the management of municipal solid waste pursuant to legislation including, but not limited to, the California Integrated Waste Management Act of 1989 (Division 30 of the California Public Resources Code) (the “Act”) and the Short-lived Climate Pollutants Reduction Act (“SB 1383”). County Landfills are also subject to other state and federal regulations designed to ensure that landfill operations minimize the impacts to public health and safety and the environment. District and County entered into a Waste Disposal Agreement (“WDA”) dated January 8, 2013 (“2013 Waste Disposal Agreement”) wherein the County agreed to receive and dispose of the District’s biosolids at County landfills, subject to available capacity, through June 30, 2020 at a base rate of 110% of the rate payable by Participating Cities under City Waste Disposal Agreements, subject to CPI adjustments. Thereafter on June 24, 2015 the Parties entered into the First Amendment of the 2013 Waste Disposal Agreement (“First Amendment” or “Current WDA”) extending the term of the agreement through June 30, 2025. The County has similar WDAs with cities and sanitary districts throughout Orange County (“City WDAs”), which are also expiring on June 30, 2025. The Orange County City Manager Association (“OCCMA”) is currently negotiating with the County updated rates and terms on a new WDA. The OCCMA has requested, and the County has agreed to, a one-year extension to allow time to complete negotiations. The terms of District’s WDA are closely tied to the terms that will be negotiated with the Cities and sanitary districts. Therefore, the Parties seek to extend the term of the Current WDA for one year to allow the County additional time to negotiate mutually agreeable terms with OCCMA for a new WDA, and obtain approval from their respective governing bodies. The Parties have determined that the execution this Second Amendment will serve the public health, safety, and welfare by continuing to provide a stable, predictable solid waste services to District, and reliable supply of municipal solid waste to the Disposal System. Page 3 of 4 Official action approving this Second Amendment and determining it to be in the public interest and authorizing its execution and delivery was duly taken by the County on the County authorization date indicated on the cover page hereof. Official action approving this Second Amendment and determining it to be in the public interest and authorizing its execution and delivery was duly taken by the District on the District authorization date indicated on the cover page hereof. It is, therefore, agreed as follows: 1. Extended Term. (a) Section 6.1 (A) of the Current WDA is deleted in its entirety and replaced with the following: “Extended Term. This Agreement shall continue in full force and effect until 11:59 p.m. on June 30, 2026 (the “Extended Term”), unless earlier terminated in accordance with its terms, in which event the Extended Term shall be deemed to have expired as of the date of such termination.” (b) Section 6.1 (B) is deleted in its entirety. (c) Section 6.1 (C) of the Current WDA is deleted in its entirety and replaced with the following: “Contract Rate Negotiations During Extended Term. The County shall provide periodic updates to District regarding anticipated changes to the new WDA that result from its negotiations with the OCCMA with the goal of having a final terms negotiated by September 30, 2025. (d) Appendix 2 of the City WDA is deleted in its entirety and replaced with the following: APPENDIX 2 Cumulative County Acceptable Waste Tonnage Target to be Used for Purposes of Section 4.2(B) Fiscal Year County Acceptable Waste Tonnage Cumulative County Acceptable Waste Tonnage FY 2025-26 3,166,659 3,166,659 2. Effectiveness of Second Amendment. The provisions of this Second Amendment shall not become effective unless approved by the County Board of Supervisors and executed by the County. The County shall give written notice of the Amendment effective date to the District within 30 days of the County Board approval. 3. Representations and Warranties of the Parties. Each of the parties to this Second Amendment represent and warrant that they validly existing under the laws of the State of California and that they have duly authorized the execution and delivery of this Second Amendment to each other Party. Page 4 of 4 6.Remaining Terms. All other terms and conditions of the Current WDA not specifically changed by this Second Amendment, shall remain in full force and effect. IN WITNESS WHEREOF, COUNTY and DISTRICT have caused this Second Amendment to be executed by their duly authorized officers or representatives as of the day and year first above written. County of Orange By _______________________________ Director, OC Waste & Recycling Date _____________________ Approved as to Form By _______________________________ County Counsel Date _____________________ Orange County Sanitation District By _______________________________ Board Chairman, Ryan P. Gallagher Orange County Sanitation District Date _____________________ By _______________________________ Assistant Clerk of the Board, Jackie Castro Orange County Sanitation District Date _____________________ ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4345 Agenda Date:6/25/2025 Agenda Item No:12. FROM:Robert Thompson, General Manager Originator: Jennifer Cabral, Director of Communications SUBJECT: PUBLIC AFFAIRS UPDATE FOR THE MONTH OF MAY 2025 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the Public Affairs Update for the month of May 2025. BACKGROUND Included in this report are recent activities of interest,managed by the Public Affairs Office for the month of May 2025. RELEVANT STANDARDS ·Maintain influential legislative advocacy and a public outreach program ·Maintain collaborative and cooperative relationships with regulators,stakeholders,and neighboring communities ·Listen to and seriously consider community input on environmental concerns PROBLEM The Orange County Sanitation District (OC San)is a distinguished entity in the water/wastewater industry.Despite our industry recognition,there may be limited awareness among our customers regarding the pivotal role we play in protecting public health and the environment.The absence of direct communication through a billing method may contribute to this gap in knowledge. It is our responsibility to ensure that our ratepayers comprehend the vital services we provide.Many customers may not realize that improper waste disposal into the sanitation system can adversely impact our sewer lines,reclamation plants,and the quality of water supplied through GWRS.By enhancing communication channels and fostering understanding,we aim to bridge the gap and empower our ratepayers with the knowledge needed to support and appreciate the essential work we undertake for the well-being of our community and the environment. Orange County Sanitation District Printed on 6/18/2025Page 1 of 4 powered by Legistar™ File #:2025-4345 Agenda Date:6/25/2025 Agenda Item No:12. PROPOSED SOLUTION By providing tours,community outreach,education,and general communication via OC San’s website,social media,and direct mailings,we can share information with the community,local agencies,and businesses on our messaging such as the What2Flush program,energy production, water recycling,biosolids,and our source control program.This,in turn,helps improve the quality of wastewater that is recycled or released to the ocean and the knowledge and understanding of wastewater treatment. RAMIFICATIONS OF NOT TAKING ACTION Neglecting to inform the community,local agencies,and area businesses about OC San could lead to insufficient support for our mission, hindering our ability to fulfill our responsibilities effectively. PRIOR COMMITTEE/BOARD ACTIONS June 2024 - Received and filed the Public Affairs Strategic Plan for Fiscal Years 2024-2026. ADDITIONAL INFORMATION Activities in May: Outreach Report An outreach report that includes tours,website updates,social media posts,construction notifications, speaking engagements, and more is attached to this Agenda Report. Social Media (through May 27) OC San messaging,announcements,and program updates are posted across OC San’s social media platforms. Our social media handle is @OCSanDistrict. ·Facebook: 18 posts reaching 2.5k people ·X: 16 posts reaching 544 people ·Instagram: 28 posts reaching 7.6k people ·LinkedIn: 4 posts reaching 2.5k people ·Nextdoor: 2 posts with 8.2k impressions Presentations and Outreach Events In May,OC San hosted 11 tours,welcoming a variety of groups including Orange Coast College, Servite High School,University of California Irvine,Fountain Valley Chamber of Commerce,members of the California Water Environment Association,Director Carlos Leon and his staff,and a general public tour.Staff also participated in a Career Day at Curtis Middle School.Overall,we reached approximately 230 people. Internal Communication Over the course of the month,there were 65 posts on the employee intranet -The San Box,and four emails were distributed to staff on relevant weekly topics through our Three Things to Know email. Orange County Sanitation District Printed on 6/18/2025Page 2 of 4 powered by Legistar™ File #:2025-4345 Agenda Date:6/25/2025 Agenda Item No:12. Construction Outreach Update Outreach efforts for OC San construction activities are ongoing throughout the service area.Updates were shared for projects taking place in Orange and Costa Mesa and Newport Beach through our website,email text alerts,and direct notifications reaching over 2000 subscribers via our GovDelivery platform. For details on each project, visit www.ocsan.gov/construction. Awards OC San was awarded the Platinum Peak Performance Award from the National Association of Clean Water Agencies (NACWA),which recognizes member agencies for achieving 100 percent water discharge permit compliance over a consecutive five-year period.OC San has received Platinum status for eight straight years. The award is for both Plant Nos. 1 and 2. Employee T-shirt Design Contest OC San held a staff-inspired T-Shirt Design Contest that celebrates creativity and pride in our mission.The winning design was voted by staff in May,the t-shirt will soon be available for purchase on the OC San company store.The intent is for the t-shirt to be worn by staff,family,and community members. Introducing the RISE Program As industry pioneers,OC San has various ongoing efforts that highlight our innovation to protect the environment.To promote those efforts,we have launched a new program-Resource Innovation for a Sustainable Environment (RISE).This program captures many of the efforts previously undertaken by OC San,currently underway,and new initiatives such as Supercritical Water Oxidation and Deep Well Injection.Explore www.ocsan.gov/RISE to see how we’re implementing transformative technologies and initiatives. OC San Featured in OC Register’s Online Water Insert For the sixth consecutive year,OC San participated in the Orange County Register California Water Supplemental Educational online insert.The water insert features OC San and several other local agencies.The article highlights our newly launched Resource Innovation for a Sustainable Environment (RISE)program.The insert is now published and available at www.ocsan.gov and via our social media channels. Celebrating Public Works Week The third week of May is nationally recognized as Public Works Week.OC San recognized employees with treats at our various locations,a video message from the General Manager posted on our intranet,social media posts featuring our staff,and a raffle to win OC San swag bags.The week is an opportunity to acknowledge the various departments throughout the agency and the work we do to provide an essential service. Activities in June: Social Media OC San continues to share messaging across the various social media platforms. Launching New Employee Intranet Site The Public Affairs Office in collaboration with the IT Division has developed an updated OC San intranet site -The San Box.This revamped platform will introduce much-needed upgrades to improve Orange County Sanitation District Printed on 6/18/2025Page 3 of 4 powered by Legistar™ File #:2025-4345 Agenda Date:6/25/2025 Agenda Item No:12. intranet site -The San Box.This revamped platform will introduce much-needed upgrades to improve internal communication and enhance the overall employee experience.The new San Box is expected to launch in mid-June. Presentations & Outreach In June,OC San has eight (8)scheduled tours,welcoming a variety of groups including County of Orange,Cal State Fullerton,San Diego Public Utilities,Achievement Institute for STEM Scholars, United for Student Success,new employees,and Orange County Emergency Management Organization. Honor Wall Ceremony This year’s celebration is honoring five outstanding contributors to OC San’s success.Former General Manager,Jim Herberg;Principal Environmental Specialist,Mike McCarthy;Engineering Supervisor,Brian Bingman;Senior Scientist,Yu-Li Tsai and former Board Member and Board Chairman,Greg Sebourn.They will be recognized on Wednesday,June 25,2025,at 3:30 pm in front of OC San Headquarters. Internal Communication The bimonthly issue of the employee newsletter,the Pipeline,will be published highlighting our talented staff and promoting various programs. Community Newsletter The summer issue of the OC San Connection newsletter is scheduled to be published in late June featuring various informative articles for the over 3,000 subscribers. Construction Outreach Outreach efforts will commence in June for two construction projects starting this summer,the Bay Bridge Pump Station and Force Main project in Newport Beach;and the Cypress Trunk Sewer project in Cypress and Los Alamitos.Presentations will be provided at the City Council meetings for Los Alamitos and Cypress on the Cypress Trunk Sewer Project. CEQA N/A FINANCIAL CONSIDERATIONS All items mentioned are included in OC San’s FY 2024-25 and FY 2025-26 Budget. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Outreach and Media Report for May 2025 Orange County Sanitation District Printed on 6/18/2025Page 4 of 4 powered by Legistar™ Outreach and Media Summary May 2025 OC San Public Affairs Off ice Table of Contents OUTREACH REPORT…………………………………………………………PAGE 1 FACEBOOK POSTINGS ……………………………………………...............PAGE 3 TWITTER POSTINGS …………………………………………………………PAGE 4 INSTAGRAM POSTINGS………………………………………………………PAGE 5 LINKEDIN POSTINGS………………………………………………………....PAGE 6 NEWS ARTICLES……………………………………………………………………………. PAGE 7 Outreach Report May 2025 Date Tours Attendees Tour Guide 5/1/25 South Coast Air Quality Management District 8 Randa AbuShaban 5/5/25 Orange Coast College 16 Randa AbuShaban 5/5/25 Orange Coast College Group 2 26 Randa AbuShaban 5/6/25 General Public 13 Donald Herrera 5/7/25 Servite High School 16 Chris Cervellone 5/7/25 Servite High School Group 2 13 Chris Cervellone 5/12/25 University of California Irvine 4 Eric Halverson 5/16/25 Orange Coast College 12 Eric Halverson 5/19/25 Fountain Valley Chamber 12 Randa AbuShaban 5/20/25 OC San Ocean Monitoring Team 5 Charles Falzone 5/21/25 CWEA Conference 33 Charles Falzone/ Donald Herrera 5/21/25 Director Leon and Guests 3 Rob Thompson 5/21/25 HQ Tour for CWEA Conference 15 HDR Staff Date Speaking Engagements/Events Attendees Presenter 5/9/25 Curtis Middle School Career Day 40 Larry Polk Project Area Outreach Notifications # of People Reached Output Method Costa Mesa Airway – Airport Loop Sewer Rehabilitation Project 15 page views 356 subscribers 1 website post 1 email Costa Mesa Costa Mesa Sewer Rehabilitation Along I-405 27 page views 380 subscribers 1 website post 1 email Orange Taft Ave. Sewer Improvement Project 223 page views 476 subscribers 37 people signed up for texts 3 website posts 3 emails 3 text Alerts External Communications Distribution # of People Reached 5 Minutes Per Month Celebrating the Hidden Heroes of Our Communities 130 Board Member Talking Points One 50 Email 1 Website Posts 6 posts 100 views Website Facebook 18 posts 2.5k reached Social Media Twitter 16 tweets 544 reached Social Media Instagram 28 posts 7.6k reached Social Media LinkedIn 4 posts 2.5k reached Social Media Nextdoor 2 posts 2.8k impressions Social Media 2 Post performance - Facebook Pages Data from 01 May, 2025 to 27 May, 2025 Sources Orange County Sanitation DistrictO Orange County Sanitation District May 25, 22:55O In observance of Memorial Day, our Administrative Oices will be closed on Monday, May 26. Our reclamation plants will continue to operate as always. In case of a sewer emergency, please call 714-593-7025. 55 55 Orange County Sanitation District May 23, 17:50O Wrapping up Public Works and Special Districts Week with one more big shoutout to our sta. Whether they're working at a desk or in the field, our team goes above and beyond to uphold our mission of protecting public health an… 🚧💧 200 200 Orange County Sanitation District May 21, 15:01O It's Special Districts Week! For over 70 years, OC San has provided safe, reliable wastewater collection, treatment, and recycling services — and it's all thanks to our team! Our work is essential, and so are our people 🎉 #SpecialDistrictsWe… 260 256 Orange County Sanitation District May 20, 20:30O Check out the Orange County Register's new e-edition focused on California'swater and wastewater industry. Inside you'll learn all about how we're turningwaste into resources, along with exciting projects like Supercritical Water… 💧 179 175 Orange County Sanitation District May 19, 16:06O Happy Public Works Week! From engineers to operators, our dedicated teamworks hard to serve Orange County every single day. Check out the amazing"characters" that make up OC San! #NPWW 174 167 Orange County Sanitation District May 18, 17:35O Curious about what we're up to? Learn all about our cutting-edge initiatives andresearch, including Supercritical Water Oxidation and Deep Well Injectionthrough our RISE Program. Dive right in and visit www.ocsan.gov/RISE for mor…75 71 Orange County Sanitation District May 16, 16:40O Today we're highlighting our Dry Weather Urban Runo (DWUR) Program! Lastfiscal year, we received a daily average of 2.81 million gallons of DWUR -keeping pesticides & bacteria out of local waterways! 💧🌊. Learn more at o…79 70 Orange County Sanitation District May 16, 02:07O An unfortunate incident occurred last night at our Headquarters, thankfully no one was hurt. OC San is working closely with FVPD and our security contractor.412 395 Orange County Sanitation District May 14, 19:00O Nothing beats the view from our ocean monitoring vessel, Nerissa 😍 As a keypart of our Ocean Monitoring Program, Nerissa allows our team to do importanttests and analyses of the oshore environment. 🌊 124 116 Orange County SanitationDistrict May 12, 16:35O 🚲 It's Bike to Work Week, but here at OC San, every day is Bike Around WorkDay! Our sta have access to bikes to easily navigate our facilities. We'rereducing carbon emissions, staying active, and getting the job done eiciently…157 146 Orange County SanitationDistrict May 12, 15:23O The Administration Committee Meeting is happening Wednesday, May 14 at 5 PM. Click here to view the agenda:52 48 Orange County SanitationDistrict May 09, 19:20O As #MunicipalClerksWeek wraps up, we're shining a spotlight on our incredibleBoard Services team! Their behind-the-scenes dedication keeps our Board ofDirectors, OC San sta, and the public connected and informed—ensuring… 🎉 205 194 Orange County SanitationDistrict May 07, 15:35O Happy Skilled Trades Day to all the hardworking men and women who hold our community together 🔧🧰 From electricians and mechanics to welders, we're especially thankful to our OC San sta who work daily to keep our operations… 89 85 Orange County SanitationDistrict May 05, 22:30O It’s Construction Safety Week! 🚧 At OC San, safety is more than a priority, it’s one of our core values. All week long, we will be answering your questions about safety on the job. Because when it comes to staying safe, there’s no such thing … 🦺💬 60 56 Orange County SanitationDistrict May 05, 19:15O Looking for a meaningful career that serves your community? Look no further - explore our exciting opportunities at ocsan.gov/careers!153 142 Orange County SanitationDistrict May 04, 16:15O At OC San, nothing goes to waste. Every day, we turn solids leover from the wastewater treatment process into a nutrient-rich soil amendment for nurseries, agriculture, and home gardens! Learn more at ocsan.gov/biosolids 🌱… 103 97 Orange County SanitationDistrict May 02, 16:30O #FlashBackFriday to an inspection of our ocean outfall pipeline in 2020. This pipeline extends five miles from shore and sits on the seafloor at a depth of 200 feet. Using a remotely operated vehicle, our team was able to access inside th… 106 99 Orange County SanitationDistrict May 01, 17:30O Good news! OC San was honored for the 31st consecutive year with the Certificate of Achievement for Excellence in Financial Reporting for our Fiscal Year 2023-24 Annual Comprehensive Report. This honor, awarded by the… 96 89 DATE POST IMPRESSIONS REACH 3 Post performance - Twitter Data from 01 May, 2025 to 27 May, 2025 Sources @OCSanDistrictO @OCSanDistrict May 25, 22:55O In observance of Memorial Day, our Administrative Oices will be closed on Monday, May 26. Our reclamation plants will continue to operate as always. In case of a sewer emergency, please call 714-593-7025. https://twitter.com/OC… 0%0 15 @OCSanDistrict May 23, 17:50O Wrapping up Public Works and Special Districts Week with one more big shoutout to our sta. Whether they're working at a desk or in the field, our team goes above and beyond to uphold our mission of protecting public health an… 🚧💧 0%0 23 @OCSanDistrict May 21, 15:01O It's Special Districts Week! For over 70 years, OC San has provided safe, reliable wastewater collection, treatment, and recycling services — and it's all thanks to our team! Our work is essential, and so are our people 🎉 #SpecialDistrictsWe… 9.33%7 75 @OCSanDistrict May 20, 20:30O Check out the OC Register's e-edition focused on CA's water and wastewaterindustry. Inside you'll learn all about how we're turning waste into resources,along with exciting projects like Supercritical Water Oxidation and our RISE…7.69%2 26 @OCSanDistrict May 19, 16:05O Happy Public Works Week! From engineers to operators, our dedicated teamworks hard to serve Orange County every single day. Check out the amazing"characters" that make up OC San! #NPWW https://twitter.com/OCSanDistrict…6.38%3 47 @OCSanDistrict May 18, 17:35O Curious about what we're up to? Learn all about our cutting-edge initiatives andresearch, including Supercritical Water Oxidation and Deep Well Injectionthrough our RISE Program. Dive right in and visit http://www.ocsan.gov/RISE f…0%0 24 @OCSanDistrict May 16, 16:40O Today we're highlighting our Dry Weather Urban Runo (DWUR) Program! Lastfiscal year, we received a daily average of 2.81 million gallons of DWUR -keeping pesticides & bacteria out of local waterways! 💧🌊. Learn more at ht…9.38%3 32 @OCSanDistrict May 14, 19:00O Nothing beats the view from our ocean monitoring vessel, Nerissa 😍 As a keypart of our Ocean Monitoring Program, Nerissa allows our team to do importanttests and analyses of the oshore environment. 🌊 https://twitter.com/OCSan…3.7%1 27 @OCSanDistrict May 12, 16:35O 🚲 It's Bike to Work Week, but here at OC San, every day is Bike Around WorkDay! Our sta have access to bikes to easily navigate our facilities. We'rereducing carbon emissions, staying active, and getting the job done eiciently…3.03%1 33 @OCSanDistrict May 09, 19:20O As #MunicipalClerksWeek wraps up, we're shining a spotlight on our incredibleBoard Services team! Their behind-the-scenes dedication keeps our Board ofDirectors, OC San sta, and the public connected and informed—ensuring… 🎉 0%0 25 @OCSanDistrict May 07, 15:35O Happy Skilled Trades Day to the hardworking men and women who hold ourcommunity together🔧 From electricians to welders, we're thankful to our stawho work to keep our operations running. Looking for a job in the trades? Visit …2.94%1 34 @OCSanDistrict May 05, 22:30O It’s Construction Safety Week! 🚧 At OC San, safety is more than a priority, it’s acore value. We will be answering your questions about construction safety.Because when it comes to staying safe, there’s no such thing as a silly question…0%0 44 @OCSanDistrict May 05, 19:15O Looking for a meaningful career that serves your community? Look no further - explore our exciting opportunities at http://ocsan.gov/careers! https://twitter.co m/OCSanDistrict/status/1919470915227619451/video/1 0%0 25 @OCSanDistrict May 04, 16:15O At OC San, nothing goes to waste. Every day, we turn solids leover from the wastewater treatment process into a nutrient-rich soil amendment for nurseries, agriculture, and home gardens! Learn more at http://ocsan.gov/biosolids 🌱… 2.38%1 42 @OCSanDistrict May 02, 16:30O #FlashBackFriday to an inspection of our ocean outfall pipeline, which extends five miles from shore and sits on the seafloor at a depth of 200 feet. Using a remotely operated vehicle, our team was able to go inside to assess its… 4.65%2 43 @OCSanDistrict May 01, 17:30O OC San was honored for the 31st consecutive year with the Certificate of Achievement for Excellence in Financial Reporting for our FY 2023-24 Annual Comprehensive Report. This honor, awarded by the GFOA, is the highest form … 0%0 29 DATE POST ENGAGEMENT RATE ENGAGEMENTS IMPRESSIONS 4 Post performance - Instagram Business Data from 01 May, 2025 to 27 May, 2025 Sources ocsandistrictO ocsandistrict May 25, 22:55O In observance of Memorial Day, our Administrative Oices will be closed on Monday, May 26. Our reclamation plants will continue to operate as always. In case of a sewer emergency, please call 714-593-7025. 1.04%0 1 96 ocsandistrict May 24, 19:50O (No description)0%134 0 134 ocsandistrict May 23, 17:50O Wrapping up Public Works and Special Districts Week with one more big shoutout to our sta. Whether they're working at a desk or in the field, our team goes above and beyond to uphold our mission of protecting public health an… 🚧💧 10.6%0 22 217 ocsandistrict May 23, 03:41O (No description)0%165 0 163 ocsandistrict May 22, 18:05O Confined Space Training at Plant No. 1 0%236 0 231 ocsandistrict May 21, 18:45O CWEA training and vendor exhibition at OC San’s HQ @cweamembers 0%345 0 326 ocsandistrict May 21, 15:01O It's Special Districts Week! For over 70 years, OC San has provided safe, reliablewastewater collection, treatment, and recycling services — and it's all thanks toour team! Our work is essential, and so are our people 🎉 #SpecialDistrictsWeek 13.43%0 35 283 ocsandistrict May 20, 20:30O Check out the Orange County Register's new e-edition focused on California'swater and wastewater industry. Inside you'll learn all about how we're turningwaste into resources, along with exciting projects like Supercritical Water… 💧 10.92%0 23 229 ocsandistrict May 20, 15:40O (No description)0%121 0 119 ocsandistrict May 19, 23:12O Happy Public Works Week!0%145 0 139 ocsandistrict May 19, 16:05O Happy Public Works Week! From engineers to operators, our dedicated teamworks hard to serve Orange County every single day. Check out the amazing"characters" that make up OC San! #NPWW 11.82%0 67 804 ocsandistrict May 18, 17:35O Curious about what we're up to? Learn all about our cutting-edge initiatives andresearch, including Supercritical Water Oxidation and Deep Well Injectionthrough our RISE Program. Dive right in and visit www.ocsan.gov/RISE for mor…3.48%0 4 115 ocsandistrict May 16, 19:21O Beautiful Day at Epcot aka Plant No. 2’s Primary Clarifiers 0%172 0 171 ocsandistrict May 16, 16:40O Today we're highlighting our Dry Weather Urban Runo (DWUR) Program! Last fiscal year, we received a daily average of 2.81 million gallons of DWUR - keeping pesticides & bacteria out of local waterways! 💧🌊. Learn more at o… 3.01%0 4 166 ocsandistrict May 14, 19:00O Nothing beats the view from our ocean monitoring vessel, Nerissa 😍 As a key part of our Ocean Monitoring Program, Nerissa allows our team to do important tests and analyses of the oshore environment. 🌊 11.48%0 23 209 ocsandistrict May 12, 16:35O 🚲 It's Bike to Work Week, but here at OC San, every day is Bike Around Work Day! Our sta have access to bikes to easily navigate our facilities. We're reducing carbon emissions, staying active, and getting the job done eiciently… 11.85%0 33 287 ocsandistrict May 09, 19:20O As #MunicipalClerksWeek wraps up, we're shining a spotlight on our incredible Board Services team! Their behind-the-scenes dedication keeps our Board of Directors, OC San sta, and the public connected and informed—ensuring… 🎉 10.33%0 28 300 ocsandistrict May 08, 14:18O #ConstructionSafetyWeek 0%197 0 197 ocsandistrict May 07, 17:16O We would say it’s to always wear proper personal protective equipment(PPE).That is the first step to ensuring the safety of the team.0%120 0 116 ocsandistrict May 07, 17:00O #ConstructionSafetyWeek 0%132 0 128 ocsandistrict May 07, 15:35O Happy Skilled Trades Day to all the hardworking men and women who hold our community together 🔧🧰 From electricians and mechanics to welders, we're especially thankful to our OC San sta who work daily to keep our operations… 9.17%0 18 218 ocsandistrict May 06, 18:09O Spill Drill Training at Plant No. 1 0%155 0 152 ocsandistrict May 06, 16:28O #ConstructionSafetyWeek 0%167 0 162 ocsandistrict May 05, 22:30O It’s Construction Safety Week! 🚧 At OC San, safety is more than a priority, it’s one of our core values. All week long, we will be answering your questions about safety on the job. Because when it comes to staying safe, there’s no such thing … 🦺💬 5.46%0 9 183 ocsandistrict May 05, 19:15O Looking for a meaningful career that serves your community? Look no further -explore our exciting opportunities at ocsan.gov/careers!3.13%0 4 128 ocsandistrict May 04, 16:15O At OC San, nothing goes to waste. Every day, we turn solids leover from the wastewater treatment process into a nutrient-rich soil amendment for nurseries, agriculture, and home gardens! Learn more at ocsan.gov/biosolids 🌱… 10.1%0 20 208 ocsandistrict May 02, 16:30O #FlashBackFriday to an inspection of our ocean outfall pipeline in 2020. This pipeline extends five miles from shore and sits on the seafloor at a depth of 200 feet. Using a remotely operated vehicle, our team was able to access inside th… 10.04%0 23 239 ocsandistrict May 01, 17:30O Good news! OC San was honored for the 31st consecutive year with the Certificate of Achievement for Excellence in Financial Reporting for our Fiscal Year 2023-24 Annual Comprehensive Report. This honor, awarded by the… 5.63%0 11 213 ocsandistrict May 01, 00:02O @cityoforange_ca For more information visit:0%1,839 0 1,777 DATE POST ENGAGEMENT RATE IMPRESSIONS LIKES REACH 5 Post performance - LinkedIn Pages Data from 01 May, 2025 to 27 May, 2025 Sources Orange County Sanitation DistrictO Orange County Sanitation District May 21, 15:01O It's Special Districts Week! For over 70 years, OC San has provided safe, reliable wastewater collection, treatment, and recycling services — and it's all thanks to our team! Our work is essential, and so are our people 🎉 #SpecialDistrictsWe… 12.72%692 35 1 Orange County Sanitation District May 20, 20:30O Check out the Orange County Register's new e-edition focused on California's water and wastewater industry. Inside you'll learn all about how we're turning waste into resources, along with exciting projects like Supercritical Water… 💧 8.82%839 38 2 Orange County Sanitation District May 18, 17:35O Curious about what we're up to? Learn all about our cutting-edge initiatives and research, including Supercritical Water Oxidation and Deep Well Injection through our RISE Program. Dive right in and visit www.ocsan.gov/RISE for mor… 7.76%438 12 1 Orange County Sanitation District May 01, 17:30O OC San was honored for the 31st consecutive year with the Certificate ofAchievement for Excellence in Financial Reporting for our Fiscal Year 2023-24Annual Comprehensive Report. This honor, awarded by the Government Finan…3.11%579 13 1 DATE POST ENGAGEMENT RATE IMPRESSIONS REACTIONS SHARES 6 Article Date Source Link Let It Flow: Building the World’s Largest Recycling Plant ― in Orange County 4/29/2025 USC Magazine https://magazine.viterbi.usc.edu/spring- 2025/alumni/let-it-flow-building-the-worlds- largest-recycling-plant-%E2%80%95-in-orange- county/ How Water Utilities Can Support The Electric Grid While Reducing Costs 5/2/2025 Water Online https://www.wateronline.com/doc/how-water- utilities-can-support-the-electric-grid-while- reducing-costs-0001 FROM WASTE TO RESOURCE: The Journey of OC San’s Water 5/12/2025 OC Register https://ocsdgov.sharepoint.com/:b:/s/External /EYO2NzB0VRJOvLZUscP8_rwBDEnHMb_hYvm SKywvpXVBDA?e=WiCUex Heal the Bay report: OC earns 34 ‘Honor Roll’ spots; Santa Monica Pier area is most polluted 5/22/2025 OC Register https://ocsdgov.sharepoint.com/:b:/s/External /EesjDw-OSq5AoJb0qIF2eTUB4M2O_P- bS0yScaW26yfWaA?e=blJh0u News Articles for May 2025 7 ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4346 Agenda Date:6/25/2025 Agenda Item No:13. FROM:Robert Thompson, General Manager Originator: Jennifer Cabral, Director of Communications SUBJECT: LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF MAY 2025 GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the Legislative Affairs Update for the month of May 2025. BACKGROUND The Orange County Sanitation District’s (OC San)legislative affairs program includes advocating for OC San’s legislative interests;sponsoring legislation (where appropriate);and seeking local,state, and federal funding for projects and programs. RELEVANT STANDARDS ·Maintain influential legislative advocacy and a public outreach program ·Build brand, trust, and support with policy makers and community leaders ·Maintain collaborative and cooperative relationships with regulators,stakeholders,and neighboring communities PROBLEM Without a strong advocacy program,elected officials may not be aware of OC San’s mission, programs, and projects and how they could be impacted by proposed legislation. PROPOSED SOLUTION Continue to work with local,state,and federal officials to advocate for OC San’s legislative interests. Help to create and monitor legislation and grants that would benefit OC San,the wastewater industry, and the community.To assist in relationship building efforts,OC San will continue to reach out to elected officials through facility tours,one-on-one meetings,and trips to Washington D.C.and Sacramento. Orange County Sanitation District Printed on 6/18/2025Page 1 of 3 powered by Legistar™ File #:2025-4346 Agenda Date:6/25/2025 Agenda Item No:13. RAMIFICATIONS OF NOT TAKING ACTION If OC San does not work with Local,State,and Federal elected officials,legislation could be passed that negatively affects OC San and the wastewater industry.Additionally,a lack of engagement may result in missed funding opportunities. ADDITIONAL INFORMATION Activities in May: WIPPES Act Letter On May 1,a letter of support for the Federal Wastewater Infrastructure Pollution Prevention and Environmental Safety (WIPPES)Act (H.R.2269)was issued.The bill proposes to create a uniform federal “Do Not Flush”labeling requirements for non-flushable wipes packaging.This proposed bill mirrors California’s wipes labeling law and is supported by the California Association of Sanitation Agencies and its membership. On Wednesday,May 21 the Senate Committee on Commerce,Science,and Transportation favorably reported out S 1092,WIPPES Act,as amended,by voice vote.The bill now goes to the Senate Floor for consideration and a vote. The House bill, HR 2269, is awaiting floor consideration. Senate Bill (SB) 496 - Clean Fleets On May 7, OC San submitted a letter of support for SB 496 to Senator Hurtado. This bill would create an Advanced Clean Fleets Appeals Advisory Committee,ensure disaster service workers are able to effectively respond to emergency situations,and provide needed and common-sense reforms for compliance. Cap and Trade Funding Request On May 8,OC San submitted a letter to Senator Limon and Assembly Member Irwin to request the inclusion of biosolids management in the Cap-and-Trade Expenditure Plan.The letter included a request for a $100 million discretionary allocation to support the development and deployment of innovative biosolids treatment technologies across the state. California Association of Sanitation Agencies (CASA) State Legislative Committee Meeting On Friday,May 16 OC San staff and our State lobbyist attended the virtual CASA State Legislative Committee Meeting where topics discussed included bill updates,the current State budget,per-and polyfluoroalkyl substances (PFAS) bills, and proposed legislation related to environmental concerns. Local Lobbyist During the month of May,Whittingham Public Affairs Advisors (WPAA)OC San’s Local Lobbyist has continued to monitor the various City Council agendas of each of OC San’s member agencies and highlighted issues and items of relevance to OC San. Activities for June: Federal Advocacy Days Planning is underway for the Federal Advocacy Days in Washington,D.C.Board Chairman Gallagher,General Manager Thompson and our advocacy team are actively preparing for a scheduled trip on July 15-17.Throughout June,we’ll be focused on finalizing meeting schedules,Orange County Sanitation District Printed on 6/18/2025Page 2 of 3 powered by Legistar™ File #:2025-4346 Agenda Date:6/25/2025 Agenda Item No:13. scheduled trip on July 15-17.Throughout June,we’ll be focused on finalizing meeting schedules, developing key messaging, and coordinating logistics to ensure a successful and productive trip. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Federal Legislative Update ·Federal Matrix ·State Legislative Update ·State Matrix ·Local Legislative Update ·H.R. 2269, WIPPES Act - Letter of Support ·SB 496 (Hurtado) - Letter of Support ·Cap-and-Trade Funding Request ·Presentation Orange County Sanitation District Printed on 6/18/2025Page 3 of 3 powered by Legistar™ 1 | Page TO: Rebecca Long FROM: Eric Sapirstein DATE: May 22, 2025 SUBJECT: May Washington Update Since the last federal update, Congress has continued to target development of a �inal budget reconciliation with implications for federal program spending over the next ten years. The U.S. Environmental Protection Agency (USEPA) continued to address regulation of “forever chemicals” with USEPA Administrator Lee Zeldin issuing a series of policy priorities that are generally in alignment with the past Administration’s positions. However, Zeldin’s priorities are notable for the acknowledgement that water sector’s liability, attributable to the agency’s designation of per- and poly�luoroalkyl (PFAS) as hazardous substances under Superfund, demands the development of a new liability standard to protect the sector. Lastly, the Administration transmitted to Congress a �iscal year (FY) 2026 budget request that is certain to generate bipartisan push back its request to eliminate funding for USEPA’s clean water infrastructure assistance program. The following details a number of issues of interest to OC San. Budget Reconciliation Emerges But Reveals Divisions Each of the House committees with jurisdiction of program spending authorization and tax policies succeeded in approving, along party lines, recommendations to govern spending and tax cuts for the next decade. These actions and decisions do not impact the wastewater sector, as the policies do not target spending levels for programs that support water infrastructure, like the State Revolving Loan Fund (SRF). Overall, the combined budget recommendations would cut federal program spending by more than a trillion dollars and retain the 2017 tax cuts into perpetuity. The next step in the process involves packaging the various elements of the committees’ recommendations into a formal enforceable budget reconciliation measure that the president would sign into law. This is the purview of the Budget Committees in both chambers. Procedurally, the House acts �irst, and the Senate follows. The House Committee on the Budget passed the bill along a party-line vote of 17-16. Floor debate and a vote on the bill has yet to be scheduled as of this writing. 2 | Page However, policy disagreements still exist among House Republicans about the bill. Speci�ically, some Members are seeking deeper spending cuts. Secondly, Members from high tax states (including California) have insisted that the State and Local Tax (SALT) deduction be increased and demanded an increase of at least $60,000 annually (the current level is $10,000). Absent this increased level, these Members (including Rep. Young Kim) have indicated that they are unable to vote for any measure on the �loor. Other disagreements exist, notably impacts to Medicaid assistance availability. As of this writing, it remains an open question as to whether House leadership will be able to appease these concerns and secure enough support to pass the bill on the House Floor. Importance of Budget Debate For OC San, the importance of the ongoing budget debate is found in the fact that depending upon how �inal spending cuts are determined, it could, ultimately, force federal programs of importance to water quality to be reduced from existing spending levels. This is because any overall budget limits that Congress passes in a �inal reconciliation measure will dictate how much spending the Committees on Appropriations will have to allocate to individual programs. Fiscal Year 2026 Appropriations Process Jump Started with White House Budget Request On May 1, the White House transmitted its Fiscal Year 2026 budget request. The budget, referred to as a “Skinny Budget” because of its limited details, which is customary for a new Administration’s �irst budget, is notable because of the overall philosophy guiding policy. The budget request rests on a fundamental notion that many of the domestic programs are best left for the states to fund and manage. To this end, USEPA’s State Revolving Loan Fund and Categorical Grants are terminated. The justi�ication for this is the programs have outlived their purposes or are not federal responsibilities. The congressional reception to the Skinny Budget has been chilly. USEPA Administrator Zeldin testifying before the House and Senate Committees on Appropriations received bipartisan comments from leadership that requested programs’ funding levels were unacceptable. Aside from statements in support of a robust federal partnership with the states and local communities, Members also expressed skepticism as to whether the agency would have the necessary quali�ied staff to manage its responsibilities given the reductions in workforce. Importance of Congressional Budget Review As Congress works to �inalize a budget reconciliation package that will guide overall spending, the committees that must comply with any spending ceilings appear prepared to support funding of critical infrastructure funding programs at USEPA and most likely other agencies. These committees must also determine funding levels for agency staf�ing levels. Concerns over the past months’ voluntary retirements, probationary �irings and imminent reductions 3 | Page in force may create new tensions between Congress and the Administration over the composition of any �inal Fiscal Year 2026 spending bills that might prevent a �inal budget being enacted by October 1. This could, again, end in a year-long spending bill that would limit how federal programs would be implemented. NPDES Permitting Reforms Legislation Introduced In a recent House Committee on Transportation & Infrastructure hearing, witnesses discussed the importance of speeding up project construction under the Clean Water Act, while reducing bureaucratic delays. Representative John Garamendi (D-CA) announced a bipartisan bill that would allow states to issue 10-year National Pollutant Discharge Elimination System (NPDES) permits to clean water agencies. After the hearing, Representatives Ken Calvert (R-CA), Garamendi, and David Rouzer (R-NC) introduced H.R. 2093, which includes provisions from last year's House-passed Con�idence in Clean Water Permitting Act. This bill would help wastewater, water recycling, and desalination projects. The Senate Committee on Environment and Public Works also recently held a hearing on permitting issues, where all witnesses agreed that reforms are needed. Committee members, from both parties, pointed out that the current federal permitting process is too slow and costly, without bene�iting the environment. As a result, committee staff are considering broad reforms to energy and environmental permitting in the coming months, including discussions about 10-year NPDES permit terms Importance of Ten-Year Permits Legislation The 119th Congress and the Administration have placed priority on permitting reforms. As a result, the environment to authorize ten-year NPDES permit terms has become more receptive than in past years. If reforms are passed, a bill would likely be signed into law. If enacted into law, water sector agencies would realize reduced administrative red tape associated with Clean Water Act to permit renewals and deliver ef�iciencies in complying with the Clean Water Act. ‘Do Not Flush’ Legislation Advances in the Senate Following last month’s House committee action approving the WIPPES Act (H.R. 2269), �loor action is likely within the next several weeks. As the bill passed the House last Congress, it is hoped that �loor action on H.R. 2269 will be pro forma with little if any complications for passage. In the Senate, a major advancement of the Senate version of the WIPPES bill, S. 1092, is slated for mark-up on May 21. Assuming the Senate Committee on Commerce approves the legislation on a bipartisan basis, it should lead to Senate �loor debate and a vote. Once this happens, and the House passes its bill, a conference committee will be scheduled between the two chambers to reconcile any differences, if such differences exist. Importance of Senate Action on WIPPES Act 4 | Page Senate committee consideration and approval of the legislation would remove a major hurdle for passage of the bill. The limited calendar during the past Congress precluded Senate committee action. The decision to move forward on the bill early in this Congress suggests that �inal congressional action on the WIPPES Act is highly probable. Regardless of the contours of any �inal agreement, it appears the legislation would establish a federal standard requiring manufacturers to label such products with a 'Do Not Flush' warning, aligning with California's state law. USEPA Administrator Details Priorities To Address PFAS Chemicals USEPA Administrator Zeldin released an extensive policy statement on how he expects the agency to proceed on developing policies and rules surrounding the management of PFAS and successor chemicals. Uppermost in his position is the priority to rely upon science and real time data to help make decisions. The outline of the Administrator’s priorities track the agency’s earlier PFAS policies, but with some notable policy shifts. The Administrator emphasizes that one of�icial will be tasked with managing the agency’s PFAS agenda. This should enhance coordination and transparency in PFAS policy and rule development. He also highlighted the importance attached to addressing “passive receiver” liability under Superfund for PFAS. The Administrator cited his interest in working with industry stakeholders and Congress to develop a liability regime that protects passive receivers like the wastewater sector. In addition, the Administrator af�irmed his desire to �inalize a risk assessment model for biosolids, impose ef�luent limitation guidelines on metal �inishers and manufacturers and users of PFAS to protect against discharges, require real time monitoring of PFAS presence, and rely upon the Clean Air, Safe Drinking Water, Clean Water, Solid Waste Management and Toxic Substances Control Acts to address PFAS. Importance of Administrator Position The Administrator’s announced PFAS priorities carries important weight and supports OC San’s interests. Congress is preparing to address PFAS policy issues, including liability and treatment needs. Zeldin’s public statements on a desire to work with stakeholders on liability means that a key policymaker is on the record in support of the development of an approach to protect innocent parties that currently face potential liability because of USEPA’s hazardous substance designation under Superfund. Additionally, the priority to update acceptable management practices for biosolids on an annual basis, instead of the current three year schedule, should enhance the development and acceptability of new management technologies. This along with the priority to �inalize a validated risk assessment model for biosolids and land application should support the use of accepted management approaches. Overall, the Administrator’s stated priorities signal a renewed commitment to rely upon science and validated research in setting standards for PFAS. 1  of 4 Federal Legislative Report - May 2025 OCSAN Bills 9 Bills US HR 2269 Support Title: WIPPES Act Current Status: In House Introduction Date: 2025-03-21 Summary: H.R. 2269 would direct the Federal Trade Commission to estabilsh federal "Do Not Flush" labeling requirements for nonflushable wet wipes packaging. The labeling requirements would be enacted one year after the bill's enactment. The bill mirrors California's state labeling law and is supported by clean water, industry, environmental advocates, and civil engineer stakeholders. Senate companion legislation is S. 1092. Location: United States US HR 1265 Title: To amend the Save Our Seas 2.0 Act to expand eligibility for certain wastewater infrastructure grants, and for other purposes. Current Status: In House Introduction Date: 2025-02-12 Summary: H.R. 1265 aims to expand eligibility for certain wastewater infrastructure grants under the Save Our Seas 2.0 Act12. This expansion would allow communities and projects to qualify for federal funding, which can be used to improve and modernize wastewater treatment facilities. By increasing access to these grants, the bill seeks to enhance the capacity of wastewater management systems to handle pollutants, reduce environmental impacts, and support public health. This could lead to more efficient and effective wastewater treatment processes, ultimately contributing to cleaner waterways and a healthier environment. Location: United States US HR 2344 Title: Water ISAC Threat Protection Act Current Status: In House Introduction Date: 2025-03-25 2  of 4 Summary: Would establish a program to enhance the preparedness and resilience of drinking water and wastewater systems against various threats. The bill's primary focus is on safeguarding these critical utilities from risks such as natural disasters, cyberattacks, and other vulnerabilities that could disrupt essential water services. Introduced by Rep. Jan Schakowsky (D-IL). Location: United States US S 1118 Title: Water Intelligence, Security, and Cyber Threat Protection Act of 2025 Current Status: In Senate Introduction Date: 2025-03-25 Summary: S. 1118 would provide funding and additional access for clean water and wastewater utilities to become members of the Water Information Sharing and Analysis Center (WaterISAC). The WaterISAC is a critical source of information and best practices for water systems to protect against, mitigate, and respond to threats. House Companion bill H.R. 2344. Endorsed by American Water Works Association, Association of Metropolitan Water Agencies, National Association of Clean Water Agencies, National Association of Water Companies, and Water Environment Federation. Location: United States US S 1092 Support Title: WIPPES Act Current Status: In Senate Introduction Date: 2025-03-24 Summary: S.1092 would direct the Federal Trade Commission to estabilsh federal "Do Not Flush" labeling requirements for nonflushable wet wipes packaging. The labeling requirements would be enacted one year after the bill's enactment. The bill mirrors California's state labeling law and is supported by clean water, industry, environmental advocates, and civil engineer stakeholders. House companion legislation is HR 2269. UPDATE: S. 1092 IS SLATED FOR MARK-UP BEFORE THE SENATE COMMITTEE ON COMMERCE 5/21/25 Location: United States US HR 2093 Title: To amend the Federal Water Pollution Control Act with respect to permitting terms, and for other purposes. Current Status: In House Introduction Date: 2025-03-14 3  of 4 Summary: H.R. 2093 would amend the Clean Water Act's permitting provisions to allow for delegated states or USEPA to issue ten year National Permit Discharge Eliminate System (NPDES) permits. The bill, if enacted, would extend current terms from five years. Location: United States US S 857 Title: Water Conservation Rebate Tax Parity Act Current Status: In Senate Introduction Date: 2025-03-05 Summary: Amends federal tax law so that homeowners would not need to pay income tax when they receive rebates from water utilities for water conservation and water runoff management improvements. S. 857 - Introduced by Senator John Curtis (R-UT ) HR 1871 - Companion legislation introduced by Rep. Jared Huffman (D-CA) Location: United States US HR 1285 Title: Water Infrastructure Subcontractor and Taxpayer Protection Act of 2025 Current Status: In House Introduction Date: 2025-02-13 Summary: H.R. 1285 would amend the Water Infrastructure Finance and Innovation Act of 2014. The key points: Payment and Performance Security Requirements: The bill establishes new requirements for payment and performance security for projects funded under the act. Project Funding: Ensure that projects financed through the Water Infrastructure Finance and Innovation Act have adequate financial safeguards. Location: United States US HR 1267 Title: Water Systems PFAS Liability Protection Act Current Status: In House Introduction Date: 2025-02-12 Summary: H.R. 1267 is a reintroduction of last Congress' legislation to provide the water sector with explicit liability protection from liability under Superfund due to USEPA's rule to designate PFAS as a hazardous substance that could impose liability upon the water sector due to the law's strict, joint and several liability standard. Introduced by Rep. Gluesenkamp Perez (D-WA). and Rep. Maloy (R-UT). Description: Water Systems PFAS Liability Protection Act This bill exempts specified water management entities from liability under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) for releases of certain perfluoroalkyl or 4  of 4 polyfluoroalkyl substances, commonly referred to as PFAS. Specifically, the entities covered under the bill are public water systems, publicly or privately owned or operated treatment works, municipalities with a stormwater discharge permit, political subdivisions or special districts of a state that act as a wholesale water agency, and contractors performing the management or disposal activities for such entities. Under the bill, the exemption only applies if a specified entity transports, treats, disposes of, or arranges for the transport, treatment or disposal of PFAS consistent with applicable laws and during and following the conveyance or treatment of water under federal or state law, such as through the management or disposal of biosolids consistent with the Federal Water Pollution Control Act. Liability for damages or costs associated with the release of certain PFAS must not be precluded if an entity acted with gross negligence or willful misconduct. Location: United States 1 M E M O R A N D U M To: Orange County Sanitation District From: Townsend Public Affairs Date: May 22, 2025 Subject: May 2025 Legislative Monthly Report STATE UPDATES The rapid pace of legislative activity is expected to continue through May and June, as lawmakers work toward several upcoming deadlines. The first, on May 2, was the deadline for policy committees to hear and report fiscal bills to fiscal committees. Just one week later, on May 9, policy committees reported non-fiscal bills to the Floor. By May 23, fiscal committees are required to complete their hearings and report all bills to the Floor in their respective house of origin. This leads into the first week of June, which will be reserved exclusively for Floor sessions in each house. The legislative cycle will then reach a key milestone on June 6, the deadline for bills to move to the second house for further consideration. The legislative transition from policy review to fiscal analysis aligns with the state’s budget process, which intensifies in May with the release of the Governor’s May Revision. This revised budget proposal offered an updated assessment of the state’s fiscal outlook and evaluated the viability of funding new spending proposals included in pending legislative measures. Below is an overview of pertinent actions from the past month. State Budget Governor’s May Revise On May 15, the Governor provided a presentation overview of the State’s updated budget proposal. The May Revision, or “May Revise,” is an update to the January budget proposal that reflects new revenue projections, economic trends, caseload updates, and evolving policy priorities. The May Revision provides the Governor with an opportunity to modify funding proposals and strategies ahead of final budget negotiations with the Legislature. By law, the State must enact a balanced budget by June 15. The 2025 May Revision responds to significant fiscal pressures and broader macroeconomic uncertainty, particularly in light of federal policy developments and inflationary pressures affecting state program costs. General Fund Outlook and Budget-Balancing Strategy The Governor’s May Revision identifies a combined $12 billion deficit to close an estimated $7.5 billion shortfall in the state’s Special Fund for Economic Uncertainties (SFEU), while also building that reserve to a $4.5 billion year-end balance. These adjustments are in addition to a proposed 2 drawdown of $7.1 billion from the state’s rainy-day reserve, the Budget Stabilization Account (BSA). Following these actions, total General Fund reserves for FY 2025-26 are projected to be $15.7 billion, including $11.2 billion in the BSA and $4.5 billion in the SFEU. Total state spending under the May Revision is proposed at $321.9 billion, including $226.4 billion in General Fund expenditures—down slightly from the Governor’s January proposal. Key budget-balancing proposals include: • Cost Reductions: $5 billion in 2025-26 from reductions to Medi-Cal, In-Home Supportive Services, and other health and human services programs. These include an enrollment freeze for certain adult undocumented residents and limitations on program expansions. • Fund Shifts and Borrowing: $5 billion in temporary savings, including: o $1.3 billion in Proposition 35 MCO tax revenue redirected to Medi-Cal. o $3.4 billion in delayed General Fund repayment to Medi-Cal. o $550 million borrowed from other special funds, including the Unfair Competition Law Fund and Labor and Workforce Development Fund. • Cap-and-Trade Shifts: $1.5 billion in cap-and-trade revenues repurposed to support CAL FIRE operations, reducing General Fund obligations. • Trigger Reductions: $456 million in conditional cuts beginning in FY 2027-28 if revenues fall short, including: o $117 million for the expansion of California Food Assistance Program to undocumented adults 55+. o $339 million for tiered foster care rate expansions. While the May Revision balances the 2025-26 budget, projected structural deficits remain significant, with the Department of Finance forecasting annual shortfalls of $14 billion in 2026- 27, $19 billion in 2027-28, and $13 billion in 2028-29—even if all proposed corrective actions are adopted. Cap and Trade Program Details in May Revise The May Revision marks a conceptual shift from “Cap and Trade” to “Cap and Invest,” with the Governor advancing a proposal to extend California’s Cap and Trade program beyond 2030 and secure long-term revenue streams for high-impact climate investments. During his presentation, the Governor specifically advocated extending the program to 2045. The Governor’s proposal puts a floor of $1 billion dedicated to the High-Speed Rail Project as an ongoing funding stream, a deviation from the current 25% dedicated allocation, which fluctuates based on auction revenues. As a rebate to utility customers, the newly named Cap and Invest Program would allocate $60 billion in credits to taxpayers through 2045. The Governor also proposes trailer bill language to streamline financing and construction for the Delta Conveyance Project, signaling continued interest in climate resilience, water conveyance, and wildfire mitigation. 3 As part of the extension of the program, Legislators have started gathering stakeholder feedback on the impacts of the Greenhouse Gas Reduction Fund. It is likely that some legislative priorities currently being funded through the Greenhouse Gas Reduction Fund will shift as legislators take a closer look at the revenue being generated by the program. TPA has been working with OC San staff to include innovative biosolids management funding as a part of the Cap and Trade Re- Authorization and associated Greenhouse Gas Reduction Fund expenditure plan. Senate Local Government Committee Advances Brown Act Modernization Legislation In early April, the Senate Local Government Committee, chaired by Senator María Elena Durazo, heard 16 bills, including two focused on modernizing the Brown Act, which governs open meetings for local legislative bodies. These measures aim to expand teleconferencing options, improving public access, particularly for vulnerable communities such as the disabled and non-English speakers. The first bill, SB 239 (Arreguín), proposes allowing local and regional non-voting advisory bodies to conduct remote meetings, provided the physical meeting location is staffed by the body or the legislative body. This measure excludes advisory bodies with oversight over sensitive matters, such as police oversight, elections, and budgets, from remote participation. During the hearing, committee members raised concerns about maintaining public access and transparency while allowing remote meetings. Questions were raised regarding effective public participation, quorum requirements, and potential impacts on decision-making when fewer members attend in person. There was also discussion on why certain advisory bodies would be excluded from remote meetings. Additionally, the requirement for staff at the in-person meeting locations raised logistical concerns, especially for bodies without dedicated staff. Overall, the committee sought a balance between flexibility for members with caregiving or disability challenges and the need to ensure public participation and transparency. Senator Arreguín accepted amendments, including a sunset provision that expires on January 1, 2030, and emphasized that the bill strikes a balance between transparency and flexibility, especially for those unable to attend in person due to caregiving, disabilities, or logistical issues. The second Brown Act bill in the hearing, SB 707 (Durazo), aims to modernize and extend key provisions of the Act, including teleconferencing, which is set to expire in 2026. SB 707 requires certain local governments to livestream meetings, offer remote public comment, provide materials in multiple languages, and implement interpretation services to promote inclusivity. Some stakeholders raised concerns about inconsistencies in the flexibility offered to different types of multi-member bodies, which could undermine transparency. According to the Author, SB 707 is seen as a collaborative effort to balance flexibility with the need for public access. The discussion in the committee hearing reflected progress made thus far but also emphasized that conversations with stakeholders will continue to address remaining concerns. Both SB 239 and SB 707 passed the Senate Local Government Committee, as amended, and will continue through the legislative process. These bills will have an impact on OC San through increased transparency requires and could be challenging to implement. However, both bills are expected to undergo additional changes in the coming weeks. OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 259 Rubio [D]This bill would remove the January 1, 2026, date from the provisions of AB 2449 (Rubio), thereby extending the alternative teleconferencing procedures that are currently in effect indefinitely. Passed the Assembly Currently in the Senate. Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Support CASA - Support CSDA - Sponsor ACWA - Support AB 339 Ortega [D]This bill would require the governing body of a public agency, and boards and commissions designated by law or by the governing body of a public agency, to give the recognized employee organization no less than 120 days’ written notice before issuing a request for proposals, request for quotes, or renewing or extending an existing contract to perform services that are within the scope of work of the job classifications represented by the recognized employee organization. The bill would require the notice to include specified information, including the anticipated duration of the contract. Currently in the Assembly Appropriations Committee Oppose Legislative and Regulatory Policies: Labor Relations/Human Resources: Oppose efforts reducing local control over public employee disputes and imposing regulations on an outside agency. ACC-OC - NYC LOCC - Oppose CASA - Oppose CSDA - Oppose ACWA - Not Favor AB 340 Ahrens [D]This bill would also prohibit a local public agency employer, a state employer, a public school employer, a higher education employer, or the district from questioning any employee or employee representative regarding communications made in confidence between an employee and an employee representative in connection with representation relating to any matter within the scope of the recognized employee organization’s representation. Currently in the Assembly Appropriations Committee Watch Legislative and Regulatory Policies: Labor Relations/Human Resources: Oppose efforts reducing local control over public employee disputes and imposing regulations on an outside agency. ACC-OC - NYC LOCC - Oppose CASA - NYC CSDA - Oppose ACWA - NYC Proposed Legislation 2025 High Priority OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 370 Carrillo [D]This bill would revise the definition of unusual circumstances as it applies to a state of emergency to require the state of emergency, in addition to currently affecting the agency’s ability to timely respond to requests as described above, to also require the state of emergency to directly affect the agency’s ability to timely respond to requests as described above. By restricting the time period in which a local agency may respond to requests, thus increasing the duties of local officials, this bill would create a state-mandated local program. Current law requires each agency, within 10 days of a request for a copy of records, to determine whether the request seeks copies of disclosable public records in possession of the agency and to promptly notify the person of the determination and the reasons therefor. Current law authorizes that time limit to be extended by no more than 14 days under unusual circumstances, and defines “unusual circumstances” to include, among other things, the need to search for, collect, and appropriately examine records during a state of emergency when the state of emergency currently affects the agency’s ability to timely respond to requests due to staffing shortages or closure of facilities, as provided. Currently in the Senate Rules Committee Support Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Support CASA - Support CSDA - Support ACWA - NYC AB 405 Addis [D]Creates the Fashion Environmental Accountability Act of 2025 and requires fashion sellers, as defined, to carry out effective environmental due diligence. Requires, by January 1, 2028, in accordance with internationally recognized methodologies for chemical management and wastewater testing, a fashion seller to require all of its significant tier 2 dyeing, finishing, printing, and garment washing suppliers to do all of the following: (a) Sample and annually report to the fashion seller on wastewater chemical concentrations and water usage; (b) Report on chemical inventory; and, (c) Provide evidence that the supplier is in compliance with local chemical management laws. The bill empowers the Department of Toxic Substances Control to oversee compliance regarding chemicals in fashion products and sets penalties for violations. Currently in the Assembly Appropriations Committee Watch State Priorities: Source Control - Support legislation and/or regulations that restrict the non-essential use of microplastics and contaminants of emerging concern in any product that is disposed or has the potential to be introduced into the sanitary sewer system. ACC-OC - NYC LOCC - NYC CASA - Work with Author CSDA - NYC ACWA - NYC AB 430 Alanis [R]Current law provides that an emergency regulation adopted by the State Water Resources Control Board following a Governor’s proclamation of a state of emergency based on drought conditions, for which the board makes specified findings, may remain in effect for up to one year, as provided, and may be renewed if the board determines that specified conditions relating to precipitation are still in effect. This bill would require the board, before the 2nd renewal of any emergency regulation or upon its repeal, to conduct a comprehensive economic study assessing the impacts of the regulation and would require the board to make the study publicly available on its internet website Currently in the Assembly Appropriations Committee Watch Legislative and Regulatory Policies: Water Quality and Supply: Support (generally) measures to increase water supply and improve water quality in the region, including drought relief legislations and regulations. ACC-OC - NYC LOCC - Watch CASA - Watch CSDA - Watch ACWA - NYC OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 538 Berman [D]Current law requires certified copies of records to be available upon request by the public and sets forth a process for the public to request the records either through the awarding body or the Division of Labor Standards Enforcement. Current law makes any contractor, subcontractor, agent, or representative who neglects to comply with the requirements to keep accurate payroll records guilty of a misdemeanor. This bill would require the awarding body, if a request is made by the public through the awarding body and the body is not in possession of the certified records, to obtain those records from the relevant contractor and make them available to the requesting entity. The bill would authorize the Division of Labor Standards Enforcement to enforce certain penalties if a contractor fails to comply with the awarding body’s request within 10 days of receipt of the notice. Currently in the Assembly Appropriations Committee Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Oppose CASA - Watch CSDA - Oppose ACWA - NYC AB 638 C. Rodriguez [D]The Stormwater Resource Planning Act authorizes one or more public agencies to develop a stormwater resource plan that meets certain standards to address the capture of stormwater, as defined, and dry weather runoff, as defined. The act requires the State Water Resources Control Board, by July 1, 2016, to establish guidance for purposes of the act. This bill would require the board, by June 1, 2026, to establish guidance for stormwater capture and use for the irrigation of urban public lands, as defined. Currently in the Assembly Appropriations Committee Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Watch CASA - NYC CSDA - Watch ACWA - NYC AB 643 Wilson [D]This bill would authorize a local jurisdiction to include organic material used as a beneficial agricultural amendment towards its recovered organic waste procurement target if the material is processed at a facility authorized by the department using specified approved technologies, and if the material is licensed for end use as an agricultural fertilizer by the Department of Food and Agriculture. Two-year bill Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Watch CASA - Support in concept CSDA - Watch ACWA - NYC OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 647 M. Gonzalez [D]This bill would require a proposed housing development containing no more than 8 residential units that is located on a lot with an existing single- family home or is zoned for 8 or fewer residential units to be considered ministerially, without discretionary review or hearing, if the proposed housing development meets certain requirements, including, among other requirements, that the proposed housing development dedicates at least one residential unit to deed-restricted affordable housing to households making at or below 80% of the area median income, as specified. The bill would prohibit a local agency from applying any development standard that will have the effect of physically precluding the construction of a housing development that meets those requirements, as specified, and from imposing on a housing development subject to these provisions any objective zoning standard or objective design standard that meets certain criteria, including imposing any requirement that applies to a project solely or partially on the basis that the housing development receives approval pursuant to these provisions. Two-year bill Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Oppose CASA - NYC CSDA - NYC ACWA - NYC AB 794 Gabriel [D]The California Safe Drinking Water Act requires the State Water Resources Control Board to administer provisions relating to the regulation of drinking water to protect public health. The state board’s duties include, but are not limited to, enforcing the federal Safe Drinking Water Act (federal act) and adopting and enforcing regulations. Current law authorizes the state board to adopt as an emergency regulation, a regulation that is not more stringent than, and is not materially different in substance and effect than, the requirements of a regulation promulgated under the federal act, with a specified exception. This bill would provide that the authority of the state board to adopt an emergency regulation pursuant to these provisions includes the authority to adopt requirements of a specified federal regulation that was in effect on January 19, 2025, regardless of whether the requirements were repealed or amended to be less stringent. The bill would prohibit an emergency regulation adopted pursuant to these provisions from implementing less stringent drinking water standards, as provided, and would authorize the regulation to include requirements that are more stringent than the requirements of the federal regulation. Currently in the Assembly Appropriations Committee Watch State Priorities: Contaminants of Emerging Concern - Support legislation that will eliminate non-essential PFAS uses to reduce and mitigate PFAS in everyday consumer goods. ACC-OC - NYC LOCC - Oppose Unless Amended CASA - Oppose CSDA - Watch ACWA - Oppose Unless Amended OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 810 Irwin [D]Current law requires that a local agency that maintains an internet website for use by the public to ensure that the internet website uses a “.gov” top- level domain or a “.ca.gov” second-level domain no later than January 1, 2029. Current law requires that a local agency that maintains public email addresses to ensure that each email address provided to its employees uses a “.gov” domain name or a “.ca.gov” domain name no later than January 1, 2029. Current law defines “local agency” for these purposes as a city, county, or city and county. This bill would recast these provisions by instead requiring a city, county, or city and county to comply with the above- described domain requirements and by deleting the term “local agency” from the above-described provisions. The bill would also require a special district, joint powers authority, or other political subdivision to comply with similar domain requirements no later than January 1, 2031. Currently in the Assembly Appropriations Committee Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Watch CASA - Watch CSDA - Oppose ACWA - Not Favor AB 818 Avila-Farias [D] This bill would prohibit, during the period of a local emergency, a local agency from denying an application for a permit necessary to rebuild or repair a residential property affected by a natural disaster unless the permit would result in the property being deemed a substandard building. The bill would require the local agency to approve or disapprove that application within 45 days of receipt of the application, and would require other expedited approvals. Currently on the Assembly Floor Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - NYC CASA - Oppose Unless Amended CSDA - Watch ACWA - NYC AB 823 Boerner [D]The Plastic Microbeads Nuisance Prevention Law prohibits a person, as defined, from selling or offering for promotional purposes in this state a personal care product containing plastic microbeads that are used to exfoliate or cleanse in a rinse-off product, including, but not limited to, toothpaste. Current law exempts a product containing less than one part per million (ppm) by weight of plastic microbeads from the prohibition. The Plastic Microbeads Nuisance Prevention Law imposes a civil penalty not to exceed $2,500 per day for each violation of the prohibition, as provided, and authorizes the Attorney General and local officials to enforce the prohibition. This bill would, on and after January 1, 2029, prohibit a person from selling, offering for sale, distributing, or offering for promotional purposes in this state a cleaning product, as defined, or a personal care product in a non-rinse-off product, containing one ppm or more by weight of plastic microbeads that are used as an abrasive, as specified. Currently in the Assembly Appropriations Committee Watch State Priorities: Source Control - Support legislation and/or regulations that restrict the non-essential use of microplastics and contaminants of emerging concern in any product that is disposed or has the potential to be introduced into the sanitary sewer system. ACC-OC - NYC LOCC - Watch CASA - Support CSDA - NYC ACWA - NYC OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS AB 872 Rubio [D]Current law, known as the Green Chemistry program, requires the Department of Toxic Substances Control to adopt regulations to establish a process to identify and prioritize chemicals or chemical ingredients in consumer products that may be considered as being chemicals of concern. Current law requires the regulations to include criteria by which chemicals and their alternatives may be evaluated by the department, as provided. Current law requires the department, following the completion of an alternatives analysis, to provide a regulatory response that may include, but is not limited to, not requiring any action and restricting or prohibiting the use of the chemical of concern in the consumer product. This bill would, beginning January 1, 2028, prohibit a person from distributing, selling, or offering for sale a covered product, as defined, that contains intentionally added PFAS, as defined, unless the department has issued a regulatory response for the covered product pursuant to the Green Chemistry program or the prohibition is preempted by federal law. Two-year bill Watch State Priorities: Source Control - Support legislation and/or regulations that restrict the non-essential use of microplastics and contaminants of emerging concern in any product that is disposed or has the potential to be introduced into the sanitary sewer system. ACC-OC - NYC LOCC - Watch CASA - Oppose CSDA - NYC ACWA - NYC AB 874 Avila Farias This bill would require a local agency to waive fees or charges that are collected by a local agency to fund the construction of public improvements or facilities for residential developments subject to a regulatory agreement with a public entity, as provided, that includes certain income and affordability requirements. Two-year bill Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - NYC CASA - Oppose Unless Amended CSDA - Oppose ACWA - Oppose Unless Amended SB 31 McNerney [D]The Water Recycling Law generally provides for the use of recycled water. Existing law requires any person who, without regard to intent or negligence, causes or permits an unauthorized discharge of 50,000 gallons or more of recycled water in or on any waters of the state to immediately notify the appropriate regional water board. This bill would, for the purposes of the above provision, redefine “recycled water” and provide that water discharged from a decorative body of water during storm events is not to be considered an unauthorized discharge if recycled water was used to restore levels due to evaporation. Currently in the Senate Appropriations Committee Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Support CASA - Support CSDA - Support ACWA - Favor OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS SB 72 Caballero [D]This bill would revise and recast certain provisions regarding The California Water Plan to, among other things, require the department to expand the membership of the advisory committee to include, among others, tribes, labor, and environmental justice interests. The bill would require the department, as part of the 2033 update to the plan, to update the interim planning target for 2050, as provided. The bill would require the target to consider the identified and future water needs for all beneficial uses, including, but not limited to, urban uses, agricultural uses, tribal uses, and the environment, and ensure safe drinking water for all Californians, among other things. The bill would require the plan to include specified components, including a discussion of the estimated costs, benefits, and impacts of any project type or action that is recommended by the department within the plan that could help achieve the water supply targets. Currently in the Senate Appropriations Committee Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Support CASA - Support CSDA - Support ACWA - Support SB 239 Arreguin [D]Current law, until January 1, 2026, authorizes specified neighborhood city councils to use alternate teleconferencing provisions related to notice, agenda, and public participation, as prescribed, if, among other requirements, the city council has adopted an authorizing resolution and 2/3 of the neighborhood city council votes to use alternate teleconference provisions, as specified. This bill would authorize a subsidiary body, as defined, to use alternative teleconferencing provisions and would impose requirements for notice, agenda, and public participation, as prescribed. The bill would require the subsidiary body to post the agenda at the primary physical meeting location. The bill would require the members of the subsidiary body to visibly appear on camera during the open portion of a meeting that is publicly accessible via the internet or other online platform, as specified. Currently on the Senate Floor Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Sponsor CASA - NYC CSDA - Support ACWA - Favor OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS SB 317 Hurtado [D]Would require the State Department of Public Health, in consultation with participating wastewater treatment facilities, local health departments, and other subject matter experts, to maintain the Cal-SuWers network of monitoring programs to test for pathogens, toxins, and other public health indicators in wastewater. The bill would require participation in the Cal- SuWers network from local health departments and wastewater treatment facilities to be voluntary. The bill would authorize the department to coordinate with health care providers, local health departments, and emergency response agencies through the regional public health office to ensure wastewater surveillance data is used for early intervention, outbreak response, epidemiological investigations, and public health planning. The bill would authorize the department to communicate to the general public, through a publicly accessible internet website, as specified, to provide transparency and public awareness of wastewater-based disease monitoring. The bill would authorize the department to utilize external funding sources, in addition to the department’s existing, noncontinuously appropriated funding sources, to implement these provisions. The bill would make related findings and declarations. Currently in the Senate Appropriations Committee Support Legislative and Regulatory Policies: Public Health - Support (generally) measures that provide for improved public health through regulation. ACC-OC - NYC LOCC - Watch CASA - Support in Concept CSDA - Watch ACWA - NYC SB 318 Becker [D]Existing law designates the State Air Resources Board as responsible for controlling vehicular air pollution, while air pollution from non-vehicular sources is managed by air pollution control districts. Air districts can require permits to construct or operate equipment emitting air contaminants, with certain exceptions. Under the Clean Air Act, new or modified major sources must use best available control technology for emissions. This bill defines "best available control technology" for these purposes and establishes a process for evaluating permits. It requires the executive officer of the state board to review permits for Title V sources and object if they do not comply with the Clean Air Act. The bill also requires a technical feasibility analysis for certain renewal permits and allows for more stringent measures than those proposed by applicants. The bill revises the precertification program by updating criteria every eight years and expanding it to include various types of equipment and processes. It allows for temporary employee assignments to leverage expertise and invites other regulatory agencies to join the expansion of the precertification program. Currently in the Senate Appropriations Committee Watch Legislative and Regulatory Policies: Air Quality - Monitor legislative and regulatory developments in response to State’s goal of achieving Carbon Neutrality including the Advanced Clean Fleets and the Zero- Emission Forklift Fleets regulations pertaining to the electrification of engine- driven equipment and fleets. ACC-OC - NYC LOCC - NYC CASA - Watch CSDA - Watch ACWA - NYC OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS SB 454 McNerney [D]This bill would create the PFAS Mitigation Fund in the State Treasury and would authorize certain moneys in the fund to be expended by the state board, upon appropriation by the Legislature, for specified purposes. The bill would authorize the state board to seek out and deposit nonstate, federal, and private funds, require those funds to be deposited into the PFAS Mitigation Fund, and continuously appropriate the nonstate, federal, and private funds in the fund to the state board for specified purposes, thereby making an appropriation. The bill would authorize the state board to establish accounts within the PFAS Mitigation Fund. The bill would authorize the state board to expend moneys from the fund in the form of a grant, loan, or contract, or to provide assistance services to water suppliers and sewer system providers, as those terms are defined, for multiple purposes, including, among other things, to cover or reduce the costs for water suppliers associated with treating drinking water to meet the applicable state and federal maximum perfluoroalkyl and polyfluoroalkyl substances (PFAS) contaminant levels. Currently in the Senate Appropriations Committee Watch State Priorities: Contaminants of Emerging Concern - Support legislation that will eliminate non-essential PFAS uses to reduce and mitigate PFAS in everyday consumer goods. ACC-OC - NYC LOCC - Sponsor CASA - Support CSDA - Support ACWA - Sponsor SB 496 Hurtado [D]Current law requires the State Air Resources Board to manage vehicle emissions and fuel standards to control air pollution effectively, ensuring they are feasible and cost-effective. The California Global Warming Solutions Act of 2006 designates this board to regulate greenhouse gas emissions. Under this authority, the board implemented the Advanced Clean Fleets Regulation, mandating that government and high-priority fleets transition to zero-emission vehicles, with some exemptions permitted. This bill proposes the establishment of an Appeals Advisory Committee to review denied exemption requests. This committee, comprising specified government and non-government representatives, must meet monthly, with meetings recorded and accessible online. They must review appeals and provide recommendations within 60 days, which the board must consider publicly within another 60 days. Certain vehicles involved in emergency responses would be exempt from the regulations, and fleet owners will not be pressured to produce zero-emissions vehicle purchase agreements to delay transitioning mandates. Currently in the Senate Appropriations Committee Support Legislative and Regulatory Policies: Air Quality - Monitor legislative and regulatory developments in response to State’s goal of achieving Carbon Neutrality including the Advanced Clean Fleets and the Zero- Emission Forklift Fleets regulations pertaining to the electrification of engine- driven equipment and fleets. ACC-OC - NYC LOCC - Sponsor CASA - Watch CSDA - Sponsor ACWA - NYC OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS SB 595 Choi [R]Existing law regulates how local agencies can invest public funds in specific securities and financial instruments, subject to certain conditions. Until January 1, 2026, agencies with under $100 million in assets can invest up to 25% in eligible commercial paper, while those with $100 million or more can invest up to 40%. Starting in 2026, this changes to a uniform 25% limit, regardless of asset size. This bill would extend the current distinction until January 1, 2031, postponing the universal limit change to that date. Additionally, the bill extends until 2031 the authority for agencies to invest in certain U.S. government securities that might accrue zero interest if held to maturity. Regarding financial reporting, the law requires the Controller to publish annual financial and compensation reports for all counties, cities, and school districts. Currently, if a local agency fails to submit these reports within 20 days after notification, they must pay a penalty based on revenue. This bill changes the deadline to 10 months after the fiscal year's end and mandates the Controller to assess whether machine-readable audited financial statements can replace traditional reports. The Controller must report to the Legislature on this by December 31, 2026. Currently in the Senate Appropriations Committee Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - NYC CASA - NYC CSDA - Watch ACWA - NYC SB 601 Allen [D]The bill proposes changes to existing water quality control laws in California. It modifies requirements for businesses involved in regulated industries to demonstrate compliance with water quality permit programs when applying for permits. It extends the requirement to include businesses seeking construction permits for activities disturbing over one acre of land, with specific information such as planned disturbed acreage and identification numbers needed. Additionally, the bill permits the State Water Resources Control Board to adopt water quality control plans for all state waters, termed "nexus waters" (non-navigable waters), aligning them with federal Clean Water Act standards. The bill mandates that state's water quality control standards incorporate nexus waters in federal compliance processes, and reiterates state policies for managing proposed discharge activities. It specifies financial penalties for violating waste discharge requirements, adjusting annually from 2026, with funds directed towards the State Water Pollution Cleanup and Abatement Account. Currently in the Senate Appropriations Committee Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Oppose CASA - Oppose CSDA - Oppose ACWA - Oppose OC San State Bills of Interest BILL AUTHOR SUMMARY LATEST ACTION OC SAN POSITION LEGISLATIVE PLAN OTHER POSITIONS SB 682 Allen [D]Current law requires the Department of Toxic Substances Control, on or before January 1, 2029, to adopt regulations to enforce specified covered perfluoroalkyl and polyfluoroalkyl substances (PFAS) restrictions, which include prohibitions on the distribution, sale, or offering for sale of certain products that contain specified levels of PFAS. Current law requires the department, on and after July 1, 2030, to enforce and ensure compliance with those provisions and regulations, as provided. This bill would, on and after January 1, 2027, prohibit a person from distributing, selling, or offering for sale a covered product that contain intentionally added PFAS, as defined, except for previously used products and as otherwise preempted by federal law. The bill would define “covered product” to include cleaning products, cookware, dental floss, juvenile products, food packaging, and ski wax, as specified. Currently in the Senate Appropriations Committee Support State Priorities: Contaminants of Emerging Concern - Support legislation that will eliminate non-essential PFAS uses to reduce and mitigate PFAS in everyday consumer goods. ACC-OC - NYC LOCC - Support CASA - Sponsor CSDA - Support ACWA - Favor SB 707 Durazo [D]The Ralph M. Brown Act requires, with specified exceptions, that all meetings of a legislative body, as defined, of a local agency be open and public and that all persons be permitted to attend and participate. This bill would, until January 1, 2030, require a city council or a county board of supervisors to comply with additional meeting requirements, including that all open and public meetings include an opportunity for members of the public to attend via a 2-way telephonic service or a 2-way audiovisual platform, as defined, that a system is in place for requesting and receiving interpretation services for public meetings, as specified, and that the city council or county board of supervisors encourage residents to participate in public meetings, as specified. For special districts, this bill will require agenda translation for all languages spoken by 20 percent of the residents of the county, as well as interpretation services for public meetings. Currently on the Senate Floor Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Concerns CASA - Watch CSDA - Oppose Unless Amended ACWA - NYC SB 740 Rubio [D]Current law authorizes a municipal wastewater agency to enter into agreements with entities responsible for stormwater management, including, but not limited to, municipal, industrial, and commercial stormwater dischargers, for the purpose of managing stormwater and dry weather runoff. Current law requires a municipal wastewater agency, if the agency enters into a new agreement or amends an agreement pursuant to those provisions, to file a copy of the agreement or amendment with the local agency formation commission in each county where any part of the municipal wastewater agency’s territory is located within 30 days after the effective date of the new agreement or amendment. This bill would extend that filing requirement timeline to 40 days. Two-year bill Watch Legislative and Regulatory Policies: Special Districts - Oppose further state regulations that adversely impact special district financing, operations, and administration. ACC-OC - NYC LOCC - Watch CASA - NYC CSDA - Watch ACWA - NYC Legend: ACC-OC - Association of California Cities, Orange County LOCC - League of California Cities NYC - Not Yet Considered CASA - California Association of Sanitation Agencies ACWA - Association of California Water Agencies CSDA - California Special Districts Association 1 | Page TO: Orange County Sanitation District (OC San) FROM: Whittingham Public Affairs Advisors DATE: May 22, 2025 SUBJECT: May Local Legislative Report Following is a few of the more notable developments and issues that have transpired in Orange County over the last several weeks: • Public relations consultant Betty Martinez-Franco was sworn in to represent the residents of the 5th District on the Irvine City Council. This position had been vacant since Councilmember Larry Agran was elected Mayor last November. • A majority of the Costa Mesa City Council voted to terminate the contract of City Manager Lori Ann Farrell Harrison, who had served in that capacity since 2019. In addition to Costa Mesa, the cities of La Palma, Orange, and Placentia are also currently in the process of identifying and selecting a new City Manager. • The Anaheim Chamber of Commerce, which first opened its doors in 1895, had announced mid-April that it would be officially terminating its operations at the end of the month. However, a new interim President & CEO, along with new leadership of the Board of Directors, have been identified to enable the Chamber to continue its business advocacy in the city while discontinuing any political activity or fundraising. The changes come roughly three years after the Chamber’s former CEO pleaded guilty to federal criminal charges. • The County of Orange has deferred for a year proposed increases to waste disposal rates at County landfills after cities and sanitary districts strongly opposed raising “tipping” fees by more than 92 percent. While hikes were initially set to hit this year, city leaders and the county agreed to a new, one-year extension with just a 2.6 percent increase that would give them until June 2026 to work out a long- term plan. City councils across the county have considered and approved the extension and increase over the past few weeks. 2 • The Stanton City Council voted to direct its staff to research the potential of the City joining the Orange County Power Authority (OCPA), the Community Choice Aggregation (CCE) provider of electricity to residents and business in the cities of Irvine, Buena Park, Fullerton, and the CCE’s newest member, Fountain Valley. The OCPA Board also voted to reduce the amount of renewable energy it purchases due to rising energy costs, with member cities lowering the default offering levels. As part of our scope of work, Whittingham Public Affairs Advisors has continued to monitor the various City Council agendas of each of OC San’s members and highlighted issues and items of relevance. We also continue to monitor activities at the South Coast Air Quality Management District and South Orange County Wastewater Authority. It is a pleasure to work with you and to represent the Orange County Sanitation District. Sincerely, Peter Whittingham May 1, 2025 The Honorable Lou Correa U.S. House of Representatives Washington, D.C. 20515 RE: H.R. 2269, WIPPES Act Support – Orange County Sanitation District Dear Congressman Lou Correa: On behalf of the Orange County Sanitation District (OC San), I write to express our strong support for the bipartisan Wastewater Infrastructure Pollution Prevention and Environmental Safety (WIPPES) Act (H.R. 2269). This important legislation would establish uniform federal “Do Not Flush” labeling requirements for non-flushable wipes packaging—mirroring California’s successful law—and was favorably reported by the House Committee on Energy and Commerce in April. We respectfully urge you to support H.R. 2269 and vote in favor of it when it comes to the House Floor for consideration. Every day, clean water utilities like OC San confront the growing challenge caused by improperly flushed non-flushable wipes. Despite being marketed for a variety of purposes, these products are not engineered for sewer systems. When flushed, they can clog pipes, damage critical treatment equipment, burden operations, and lead to costly maintenance and environmental harm through sewer overflows. These impacts are felt not only by utilities but by the communities we serve. The WIPPES Act offers a simple, yet highly effective, source control solution by requiring consistent, clear “Do Not Flush” labeling on non- flushable wipe products. This commonsense measure will empower consumers with the information needed to properly dispose of wipes and protect our nation's wastewater infrastructure. It is notable that the legislation has earned broad and sustained support from diverse stakeholders across industry, clean water agencies, environmental organizations, and civil engineering sectors. Page 2 of 2 Passage of the WIPPES Act will strengthen the resiliency of America’s clean water infrastructure, safeguard public health, protect our environment, and save ratepayers significant costs associated with avoidable damage and repairs. OC San is proud to support H.R. 2269, and we urge you to do the same by voting in favor when it is considered on the House Floor. If you have any questions or would like additional information, please feel free to contact Jennifer Cabral, Director of Communications, at (714) 593-7581 or via email at JCabral@ocsan.gov. Thank you for your leadership and commitment to protecting our nation’s clean water resources. Sincerely, Ryan P. Gallagher Board Chairman May 7, 2025 The Honorable Melissa Hurtado California State Senate 1021 O Street, Room 6510 Sacramento, CA 95814 RE: Senate Bill (SB) 496 (Hurtado) Advanced Clean Fleets. Notice of Support – Orange County Sanitation District Dear Senator Hurtado, I write to you today on behalf of the Orange County Sanitation District (OC San) to express my support for SB 496 (Hurtado). This bill would create an Advanced Clean Fleets (ACF) Appeals Advisory Committee, ensure disaster service workers are able to effectively respond to emergency situations, and provide needed and common-sense reforms for compliance. OC San has been working diligently to reduce the carbon intensity of fleet operations while ensuring that we continue to provide the many critical services our communities rely upon for their most essential daily needs. The ACF regulation has established ambitious and often impractical compliance deadlines for fleets to transition to Zero Emission Vehicles (ZEVs). The ACF’s ZEV transition requires access to adequate utility infrastructure for alternative fueling, such as EV charging, as well as access to ZEVs that are capable of providing a comprehensive range of essential and specialized services offered by fleets, many of which are vital for the health and safety of Californians. While the ACF allows fleets to seek exemptions in cases where fleets cannot meet the compliance timetables, it lacks clarity regarding the evaluation and determination process for these exemption requests. Additionally, it does not outline a procedure for the administrative review of denied exemption requests by the California Air Resources Board (CARB). SB 496 establishes an Appeals Advisory Committee by which local agencies may request a review of exemption request denials. Allowing a formal appeals process ensures transparency while protecting due process for those seeking further review. Honorable Melissa Hurtado SB 496 Advanced Clean Fleets Page Two Additionally, SB 496 would update the emergency vehicle exemption, allowing those vehicles that respond to and support critical operations related to emergencies and disasters, often under difficult or harsh conditions, to continue to protect our communities. Also, SB 496 modifies the requirements of the daily usage exemption, removing barriers for the applicant to comply with the mandate. SB 496 would create much-needed improvements to the ACF while protecting the health and safety of Californians, avoid unnecessary costs detrimental to our shared long-term goals, and ensure that local agencies can continue to work diligently to decarbonize their fleet operations and comply with the ACF without being penalized for factors beyond their control. For these reasons, OC San supports SB 496. If you have any questions, please contact Jennifer Cabral, Director of Communications, at (714) 593-7581 or via email at JCabral@ocsan.gov. Sincerely, Ryan P. Gallagher Board Chairman May 8, 2025 The Honorable Monique Limon CA State Senator, 21st District 1021 O Street Suite 7610 The Honorable Jacqui Irwin CA State Assembly Member, 42nd District 1021 O Street Suite 6220 RE: Cap and Trade Expenditure Plan Request – Innovative Biosolids Management Programs Dear Senator Limon and Assembly Member Irwin: On behalf of the Orange County Sanitation District (OC San), I am writing to respectfully request the inclusion of biosolids management as a priority strategy in the Cap-and-Trade Expenditure Plan. Specifically, we would like to request a $100 million discretionary allocation to support the development and deployment of innovative biosolids treatment technologies across the state. This proposed program and funding source can build off the success of previous programs administered by the state and reduce emissions in a more efficient and cost- effective manner. As California advances toward carbon neutrality and deep reductions in short-lived climate pollutants (SLCPs), biosolids management presents a significant opportunity to meet those goals while protecting public health and advancing environmental justice. OC San is actively piloting and implementing two groundbreaking technologies that align with the priorities of the Cap-and-Trade Program and the Greenhouse Gas Reduction Fund (GGRF): • Supercritical Water Oxidation (SCWO) Demonstration Project This emerging process uses water at elevated temperatures and pressure to destroy organic compounds in sludge and scum, converting them into benign elements such as carbon dioxide and water. The SCWO process also destroys emerging contaminants such as per- and polyfluoroalkyl substances (PFAS), pharmaceuticals, and microplastics. This process has the potential to eliminate several steps in the current wastewater solids treatment process, lowering chemical and energy consumption, and reducing long haul trucking of the solids removed as part of the wastewater process. OC San is currently advancing a demonstration-scale project and anticipates regional and statewide scalability. Page 2 of 3 • Deep Well Injection This method permanently sequesters biosolids more than 5,000 feet underground into porous geological formations beneath multiple layers of impermeable rock, at their source of generation, rather than moving them into other jurisdictions while at the same time eliminating odors and sources for groundwater and soil contamination, and road traffic. This proven technology provides a long-term, secure solution for carbon-rich materials and residuals that contain trace amounts of harmful substances. It is especially well-suited for handling materials with persistent contaminants like PFAS, microplastics, and pharmaceutical residues. Each wet ton of biosolids sequestered in this way eliminates the emissions of more than 5 tons of CO2e, thus providing enormous support to the goals of the GGRF. These two technologies provide a measurable and scalable path to reducing greenhouse gas emissions through: • Avoiding GHG emissions by eliminating landfilling or land applying of organic materials • Reducing vehicle miles traveled (VMT) by limiting long-haul biosolids transport— OC San currently transports over 500 wet tons of biosolids per day with a total of approximately 2,900,000 miles traveled annually to various composting facilities in California and/or farmlands in Arizona. Avoided trucking could reduce up to 5,500 metric tons of CO2e per year just for OC San. • Finding a forever home for harmful pollutants and avoiding the future emissions and health impacts associated with environmental contamination. These technologies support multiple priorities of the Cap-and-Trade Expenditure Plan, including: • Reducing GHG emissions and SLCPs • Promoting innovation in climate solutions • Advancing clean energy and sustainable waste management • Reducing VMT and local air pollution • Delivering co-benefits to public health, especially for disadvantaged communities • Supporting the principles of a circular economy OC San is committed to advancing sustainable, long-term solutions for biosolids management that are practical, cost-effective, and protective of public health and the environment. Page 3 of 3 We respectfully urge the Cap-and-Trade Working Group to consider a $100 million funding allocation to create a statewide competitive grant program that will help agencies like ours implement emerging biosolids management technologies. We thank you for your continued leadership in advancing California’s ambitious climate agenda and look forward to the opportunity to contribute innovative solutions that move the state closer to a more sustainable, equitable, and climate-resilient future. If you have any questions, please contact Jennifer Cabral, Director of Communications, at (714) 593-7581 or via email at JCabral@ocsan.gov. Sincerely, Ryan P. Gallagher Board Chairman CC: Orange County Legislative Delegation Senate pro Tempore Mike McGuire Assembly Speaker Robert Rivas Cap and Trade Working Group Members: Assembly Member Cottie Petrie-Norris Assembly Member Chris Rogers Assembly Member Esmerelda Soria Assembly Member Corey Jackson Assembly Member Diane Papan Assembly Member Isaac Bryan Assembly Member Lori Wilson Assembly Member Rebecca Bauer-Kahan Assembly Member Steve Bennett Assembly Member Cecilia Aguiar-Curry Assembly Member Al Muratsuchi Assembly Member Damon Connolly Assembly Member David Alvarez Assembly Member Dawn Addis Assembly Member Rick Zbur Assembly Member Gregg Hart Assembly Member Rhodesia Ransom Senator Ben Allen Senator Henry Stern Senator Catherine Blakespear Assembly Budget Subcommittee No. 4 Senate Budget Subcommittee No. 2 FEDERAL UPDATE PRESENTED BY: ERIC SAPIRSTEIN ENS RESOURCES ADMINISTRATION COMMITTEE JUNE 11, 2025 1 ISSUES >ĞŐŝƐůĂƚŝǀĞWƌŝŽƌŝƚŝĞƐ͗ ZĞĐŽŶĐŝůŝĂƚŝŽŶ͕&ŝƐĐĂůzĞĂƌϮϬϮϲƵĚŐĞƚ͕ƵƚŚŽƌŝnjĂƚŝŽŶƐ h͘^͘ŶǀŝƌŽŶŵĞŶƚĂůWƌŽƚĞĐƚŝŽŶŐĞŶĐLJ͗ WĞƌͲ ĂŶĚƉŽůLJĨůƵŽƌŽĂůŬLJůƐƵďƐƚĂŶĐĞƐ;W&^Ϳ >ŽŽŬŝŶŐŚĞĂĚ 2 Page No. 1 06/02/2025 LEGISLATIVE PRIORITIES ‰ZĞĐŽŶĐŝůŝĂƚŝŽŶ 9^ƚĂƚĞĂŶĚ>ŽĐĂůdĂdž;^>dͿ 9ZĞŐƵůĂƚŝŽŶƉƉƌŽǀĂů 9^ƉĞŶĚŝŶŐͬdĂdžĞƐ ‰&ŝƐĐĂůzĞĂƌϮϬϮϲƉƉƌŽƉƌŝĂƚŝŽŶƐ 9tŚŝƚĞ,ŽƵƐĞ^ƉĞŶĚŝŶŐWƌŝŽƌŝƚŝĞƐ͗͞ŽŽƉĞƌĂƚŝǀĞ&ĞĚĞƌĂůŝƐŵ͟ 9WƌŽŐƌĂŵ/ŵƉĂĐƚƐ ‰ƵƚŚŽƌŝnjĂƚŝŽŶƐ ‰t/WW^;&ůƵƐŚĂďůĞtŝƉĞƐͿ͕,͘Z͘ϮϮϲϵͬ^͘ϭϬϵϮ ‰WĞƌŵŝƚZĞĨŽƌŵ 3 PFAS - NEXT STEPS ‰WĚŵŝŶŝƐƚƌĂƚŽƌW&^WƌŝŽƌŝƚŝĞƐůŝŐŶǁŝƚŚƉƌŝŽƌĚŵŝŶŝƐƚƌĂƚŝŽŶďƵƚŬĞLJĚŝĨĨĞƌĞŶĐĞƐ͗ 9 ŽŵƉůĞƚĞŝŽƐŽůŝĚƐZŝƐŬƐƐĞƐƐŵĞŶƚDŽĚĞů 9 ZĞǀŝĞǁ^ƵƉĞƌĨƵŶĚ,ĂnjĂƌĚŽƵƐ^ƵďƐƚĂŶĐĞĞƐŝŐŶĂƚŝŽŶ 9 ŽŶĚƵĐƚĂŶŶƵĂůƌĞǀŝĞǁƐŽĨďŝŽƐŽůŝĚƐƚƌĞĂƚŵĞŶƚƚĞĐŚŶŽůŽŐŝĞƐ 9 /ƐƐƵĞĨĨůƵĞŶƚ>ŝŵŝƚĂƚŝŽŶƐŽŶŝŶĚƵƐƚƌLJĚŝƐĐŚĂƌŐĞƐ 9 ZĞͲĞǀĂůƵĂƚĞ͞ŚĂnjĂƌĚŝŶĚĞdž͟ĨŽƌ'ĞŶͲyW&^ĐŚĞŵŝĐĂůƐƌƵůĞŵĂŬŝŶŐ 4 Page No. 2 06/02/2025 OUTLOOK ‰ZĞĐŽŶĐŝůŝĂƚŝŽŶ͗&ŝŶĚŽŵŵŽŶ'ƌŽƵŶĚŵŽŶŐ,ŽƵƐĞĂŶĚ^ĞŶĂƚĞ&ĂĐƚŝŽŶƐ 9,ŽƵƐĞ&ƌĞĞĚŽŵĂƵĐƵƐ͗^ƉĞŶĚŝŶŐƵƚƐ 9,ŽƵƐĞĂŶĚ^ĞĂŶƚĞDŽĚĞƌĂƚĞƐ͗DĞĚŝĐĂŝĚ 9^ĞŶĂƚĞŽŶƐĞƌǀĂƚŝǀĞƐ͗ĞĨŝĐŝƚƐ ‰ƉƉƌŽƉƌŝĂƚŝŽŶƐ͗ǀŽŝĚ'ŽǀĞƌŶŵĞŶƚ^ŚƵƚͲŽǁŶŝŶKĐƚŽďĞƌ 9ŚĂůůĞŶŐĞ͗tŚŝƚĞ,ŽƵƐĞďƵĚŐĞƚƉƌŝŽƌŝƚŝĞƐƌĞũĞĐƚĞĚďLJŬĞLJƐƉĞŶĚŝŶŐůĞĂĚĞƌƐ ƒWƌŽŐƌĂŵĐŽŶƐŽůŝĚĂƚŝŽŶƐͬĞůŝŵŝŶĂƚŝŽŶ ƒZĞĚƵĐƚŝŽŶƐŝŶ&ŽƌĐĞ;ůĂLJŽĨĨƐͿ 9WŽůŝĐLJZŝĚĞƌƐ͗>ŝŐŚƚŶŝŶŐZŽĚ ‰ƵƚŚŽƌŝnjĂƚŝŽŶƐŝŶƐŽůŝĚƉŽƐŝƚŝŽŶĨŽƌ,ŽƵƐĞĂŶĚ^ĞŶĂƚĞƉĂƐƐĂŐĞ 5 6 Page No. 3 06/02/2025 ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4347 Agenda Date:6/25/2025 Agenda Item No:14. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: FY 2025-26 PROPERTY - LIABILITY INSURANCE RENEWALS GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve the Orange County Sanitation District FY 2025-26 Property-Liability Insurance Renewals included in the FY 2025-26 Budget for the not-to-exceed amounts specified below: Property and Boiler & Machinery - Not to Exceed $3,118,944 Excess General Liability Insurance - Not to Exceed $1,429,942 Excess Workers’ Compensation Insurance - Not to Exceed $ 476,000 Earthquake Insurance - Not to Exceed $ 206,744 Cyber Liability $ 143,935 TOTAL $5,375,565 BACKGROUND Financial Management staff and the Orange County Sanitation District’s (OC San)operational insurance broker,Alliant,began the renewal process in January and received final quotes in June. After negotiating with the insurance carriers,Alliant was able to secure competitive rates for OC San without compromising the quality of coverage provided.The insurance market has been in a state of flux due to reduced reinsurer capacity,weather extremes,sea level rise,wildfires,catastrophic losses,social inflation,and cybersecurity threats around the world and in the state of California. There is a lot of uncertainty in the market and insurers have taken losses for previous years and,as a result, insurance costs will increase to absorb the losses. The uncertainty in the market due to the above-mentioned factors will impact the insurance rates.As such,OC San will need to pay higher rates to obtain the same coverage limits.The current extreme degree of uncertainty in the insurance industry means significant rate increases,at least in the short term, until the numbers play out for the insurance industry over the next few years. The proposed cost of insurance coverage for FY 2025-26 is $5,375,565,an increase of $353,772 (7%). A summary of the insurances is included in the Additional Information section below. Orange County Sanitation District Printed on 6/18/2025Page 1 of 4 powered by Legistar™ File #:2025-4347 Agenda Date:6/25/2025 Agenda Item No:14. RELEVANT STANDARDS ·Protect OC San assets PROBLEM Current insurance coverage expires June 30,2025,and insurance coverage is necessary to protect OC San assets and financial well-being. PROPOSED SOLUTION Approve the insurance renewals as described to ensure continued coverage of OC San assets. TIMING CONCERNS Board approval is necessary since current coverage expires June 30, 2025. RAMIFICATIONS OF NOT TAKING ACTION Without Board approval,OC San cannot finalize the contracts with the insurance carriers and OC San’s insurance will lapse. PRIOR COMMITTEE/BOARD ACTIONS May 2025 -Informational presentation to the Administration Committee providing an overview of the insurance renewal market. ADDITIONAL INFORMATION The cost of insurance coverage for FY 2025-26 is $5,375,565,an increase of $353,772 (7%).OC San’s budget provides funds for the renewal of the following four major insurances for OC San operations: 1)All-Risk Property and Flood Insurance (Includes Boiler & Machinery) The All-Risk Property and Flood Insurance Program (Property Insurance)provides comprehensive coverage for much of OC San’s real and personal property regarding virtually all perils including fire, flood,and business interruption.Current Property Insurance limits are $1 billion dollars for most perils other than flood and earthquakes,and $25 million dollars for flood,with many sub-limits for various situations.In order to reach $1 billion dollars in limits,the broker had to arrange for more than a dozen different insurers.The self-insured retention (SIR)is $1,000,000 per occurrence for most types of losses. Since the late 1990’s,the Property Insurance has been with a nationwide joint purchase property insurance program called Public Entity Property Insurance Program,one of the world’s largest property programs.It is important to note that this joint purchase property insurance offers the purchasing power of numerous large public entities without the pooling or sharing of coverage or Orange County Sanitation District Printed on 6/18/2025Page 2 of 4 powered by Legistar™ File #:2025-4347 Agenda Date:6/25/2025 Agenda Item No:14. purchasing power of numerous large public entities without the pooling or sharing of coverage or losses.The Boiler &Machinery Insurance component of the property insurance provides comprehensive coverage for loss caused by machinery breakdown and explosion of steam boilers or other covered process equipment,including damage to the equipment itself and damage to other property caused by covered accidents.The current Boiler &Machinery Insurance Program provides coverage of $100 million per occurrence with deductibles ranging from $25,000 to $350,000 for losses caused by covered machinery breakdown (e.g.,motors,steam turbines,digesters,co-gen engines).Damages to the equipment,as well as damage to other property and improvements from machinery breakdown,are covered by the Boiler &Machinery Insurance.This program augments OC San’s All-Risk Property Insurance that covers perils such as fire and flood. The estimated cost for All-Risk Property and Flood is $3,118,944, a decrease of $7,618 (0.2%). 2)Excess General Liability Insurance OC San’s Excess General Liability Insurance Program is currently provided through the California Municipal Excess Liability Program (CAMEL)and its sister program,the Alliant National Municipal Liability Program.OC San has participated in the CAMEL program since FY 1996-97.This program currently provides OC San with a $40 million dollar policy of comprehensive coverage for municipal liability,bodily injury and property damage,and personal injury.The program was structured to include Employment Practices and Public Officials Errors &Omissions coverage.The $40 million dollar coverage has a planned self-insured deductible of $1,000,000. The estimated cost for Excess General Liability is $1,429,942, an increase of $238,324 (20%). 3)Excess Workers’ Compensation The Excess Workers’Compensation insurance coverage is with Public Risk Innovation,Solutions, and Management (formerly California State Association of Counties Excess Insurance Authority).OC San has participated in this program or its predecessor since 2003.The Excess Workers’ Compensation program currently provides “Statutory”(unlimited)coverage with a SIR,or deductible, of $1 million. The use of Excess Workers’ Compensation Insurance dates back to the late 1980’s. The estimated cost for Excess Workers’ Compensation is $476,000, an increase of $97,658 (26%). 4)Earthquake Insurance OC San previously carried earthquake insurance as part of its Property Insurance,but in the last 15 years earthquake insurance proved difficult to obtain or not cost-effective.Each year,OC San asked its insurance broker to survey the market to see if rates changed.In 2015,a plan was created to maintain coverage on several key OC San structures identified by Engineering,thus keeping the cost manageable. The insurance is a high deductible plan with a limit of $25 million dollars in total. The estimated cost for Earthquake Insurance is $206,744, an increase of $21,216 (11%). 5)Cyber Liability Insurance OC San currently maintains Cyber Liability Insurance to protect against data breaches,network security failures,and other cyber-related incidents.As the cyber risk landscape continues to evolve,Orange County Sanitation District Printed on 6/18/2025Page 3 of 4 powered by Legistar™ File #:2025-4347 Agenda Date:6/25/2025 Agenda Item No:14. security failures,and other cyber-related incidents.As the cyber risk landscape continues to evolve, coverage has become increasingly vital.This renewal year,OC San's insurance broker Alliant, reviewed the market to evaluate available options and pricing trends.The current policy structure balances comprehensive protection with cost control,maintaining a $250,000 retention,while providing adequate coverage for potential cyber events. The estimated cost for Cyber Liability Insurance is $143,935, an increase of $4,192 (3%). CEQA N/A FINANCIAL CONSIDERATIONS This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been included in the FY 2025-26 Budget Update. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: N/A Orange County Sanitation District Printed on 6/18/2025Page 4 of 4 powered by Legistar™ STEERING COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4358 Agenda Date:6/25/2025 Agenda Item No:15. FROM:Robert Thompson, General Manager Originator: Mike Dorman, Director of Engineering SUBJECT: FOOD WASTE TIPPING FEE GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve a tipping fee of $47 per wet ton of source separated organic food waste to provide to pre- processors for planning purposes. BACKGROUND The State of California passed legislation and implemented regulations to divert source separated organics such as food waste away from landfills.After pre-processing,food waste can be anaerobically digested to reduce its volume and produce methane gas.The Orange County Sanitation District (OC San)has digester capacity and the ability to convert the generated gas to energy. The 2015 Biosolids Master Plan (BMP)evaluated the feasibility of receiving pre-processed food waste and determined that the costs to construct and operate the required receiving facilities could be offset by collecting tipping fees and power savings associated with additional biogas generation. Staff has been engaged with Orange County Waste and Recycling to review potential options for the handling,processing,and transport of food waste that could be delivered to OC San.In parallel,OC San continues to review and update tipping fees required to offset the operational and capital expenses associated with an Interim Food Waste Receiving Facility. RELEVANT STANDARDS ·Use all practical and effective means for resource recovery ·Ensure the public’s money is wisely spent ·Maintain and adhere to appropriate internal planning documents (Biosolids Master Plan) Orange County Sanitation District Printed on 6/18/2025Page 1 of 3 powered by Legistar™ File #:2025-4358 Agenda Date:6/25/2025 Agenda Item No:15. PROBLEM Orange County Waste and Recycling and other potential waste haulers cannot determine the viability of potential pre-processing facility construction and operation without knowing the tipping fee they will be charged. PROPOSED SOLUTION Provide a current tipping fee for source separated organic food waste that can be utilized by potential pre-processors and haulers for their planning efforts. TIMING CONCERNS Source separated organic food waste pre-processors and haulers need this information for planning their facilities. RAMIFICATIONS OF NOT TAKING ACTION Potential pre-processors and haulers will not have an accurate tipping fee that reflects OC San’s latest costs. PRIOR COMMITTEE/BOARD ACTIONS June 2021 -Information item and presentation to the Operations Committee regarding Food Waste Receiving. May 2020 -Information item and presentation to the Operations Committee regarding Interim Food Waste Receiving Facility, Project No. P2-124, and Pricing Policy Discussion. July 2019 -Information item and presentation to the Operations and Administration Committees regarding Interim Food Waste Receiving Facility, Project No. P2-124. September 2018 -Approved a Professional Design Services Agreement with Kennedy/Jenks Consultants to provide engineering services for Interim Food Waste Receiving Facility,Project No.P2 -124, for an amount not to exceed $695,000; and approved a contingency of $69,500 (10%). ADDITIONAL INFORMATION In 2017,the BMP calculated a tipping fee for $26/wet ton.Staff recently reviewed the calculation to ensure its accuracy and updated the associated operational and capital costs based on current information. Capital costs are associated with the construction of Project P2-124,Interim Food Waste Receiving Facility,which was initially bid on December 1,2020,followed by the rejection of bids on June 23, 2021,due to not having an agreement with food waste management companies to deliver pre- processed food waste .This project cost has increased from $5,400,000 to $10,000,000 due to construction cost escalation.The reforecast of food waste received per day was also adjusted as it is not likely to operate the facility at full capacity each day and there are likely times when deliveriesOrange County Sanitation District Printed on 6/18/2025Page 2 of 3 powered by Legistar™ File #:2025-4358 Agenda Date:6/25/2025 Agenda Item No:15. not likely to operate the facility at full capacity each day and there are likely times when deliveries may not be received due to holidays, pre-processing facility issues, etc. Operational and maintenance costs have increased significantly over the past eight years and include higher chemical,utility,labor,and maintenance costs.In addition,fees associated with the management of biosolids have increased and were updated to reflect current values.The resulting updates are summarized in the table below: Item BMP Value Current Value Food Waste (average wet tons / day)150 120 Capital Costs ($/ton)10 23 O&M Costs ($/ton)16 24 Total ($/ton):26 47 The current tipping fee credits all anticipated power generation benefits back to offset other costs. The intention of this fee is solely to account for additional costs that OC San will incur during the construction and operation of the new facility. CEQA N/A FINANCIAL CONSIDERATIONS N/A ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: N/A JF:lb Orange County Sanitation District Printed on 6/18/2025Page 3 of 3 powered by Legistar™ STEERING COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4359 Agenda Date:6/25/2025 Agenda Item No:16. FROM:Robert Thompson, General Manager SUBJECT: GENERAL MANAGER’S FY 2024-2025 WORK PLAN YEAR-END REPORT GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the General Manager’s FY 2024-2025 Work Plan Year-End Report. BACKGROUND Each year,the General Manager prepares a work plan of activities supporting Orange County Sanitation District’s (OC San)strategic goals and initiatives to be accomplished during the fiscal year. The General Manager’s FY 2024-2025 work plan was received and filed by the Steering Committee and Board of Directors in June 2024.Attached is the year-end report for the General Manager’s FY 2024-2025 work plan. RELEVANT STANDARDS ·Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard ·Plan for and execute succession, minimizing vacant position times ·Cultivate a highly qualified, well-trained, and diverse workforce ·Maintain and adhere to appropriate internal planning documents (Biosolids,Odor,and Energy Master Plans) ·Use all practical and effective means for resource recovery PRIOR COMMITTEE/BOARD ACTIONS January 2025 -Steering Committee and Board of Directors received and filed the General Manager’s FY 2024-2025 Work Plan Mid-Year Update. June 2024 -Steering Committee and Board of Directors received and filed the General Manager’s Fiscal Year 2024-2025 Work Plan. May 2024 -Steering Committee received and filed the General Manager’s FY 2024-2025 Proposed Work Plan. Orange County Sanitation District Printed on 6/18/2025Page 1 of 2 powered by Legistar™ File #:2025-4359 Agenda Date:6/25/2025 Agenda Item No:16. ADDITIONAL INFORMATION The General Manager's work plan includes 21 goals for the fiscal year.Of those,18 were completed, one goal was not completed due to needs assessment,and two goals will carry over into Fiscal Year 2025-2026. FINANCIAL CONSIDERATIONS All items included in the General Manager’s Work Plan were budgeted in the FY 2024-2025 Budget. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·General Manager’s FY 2024-2025 Work Plan Year-End Report Orange County Sanitation District Printed on 6/18/2025Page 2 of 2 powered by Legistar™ June 25, 2025 TO: Chairman and Members of the Board of Directors FROM: Robert C. Thompson General Manager SUBJECT: General Manager’s FY 2024-2025 Work Plan Year-End Report I am pleased to present the year-end report for my Fiscal Year 2024-2025 Work Plan. The Work Plan had 21 individual goals organized under four Strategic Planning categories: Business Principles, Environmental Stewardship, Wastewater Management, and Workplace Environment. Eighteen of the 21 goals have been completed, one goal was not completed due to needs assessment, and two goals will carry over into Fiscal Year 2025-2026. 1. Business Principles • Asset Management Plan – Implement a siphon cleaning program by June 30, 2025. UPDATE: Complete. Developed a siphon cleaning program which will be implemented over the next several years. • Progressive Design-Build – Select an Owner Advisor for Progressive Design-Build by March 31, 2025. Develop Progressive Design-Build contract templates by June 30, 2025. UPDATE: Complete. Owner Advisor selected and Progressive Design-Build contract templates created and used for the Ocean Outfalls Rehabilitation, Project No. J-137. • Earned Value – Review Engineering’s earned value processes for project reporting and compare with industry best practices by June 30, 2025. UPDATE: Complete. Hired a consultant to review Engineering’s earned value processes for project reporting and compared it with industry best practices. • NPDES Permitting Legal Support – Secure legal and technical resources for 2026 NPDES permit renewal by March 31, 2025. General Manager’s FY 2024-2025 Work Plan June 25, 2025 Page 2 of 5 UPDATE: Complete. Legal services to be provided by BB&K and Allen Matkins and Technical Resources have been retained to provide technical support for NPDES permit renewal. • Permit Fees – Complete analysis of the current Capital Facilities Capacity Charges (CFCC) program to identify deficiencies for the member agencies and provide program improvement recommendation by December 31, 2024. Create a customer portal for online submission and payment of fees by June 30, 2025. UPDATE: Not Complete. OC San staff met with member agencies to evaluate the CFCC program and subsequently provided recommendations to the General Manager. For the customer portal, staff has determined that an OC San wide solution is needed, rather than a CFCC specific solution. A new updated item will be incorporated into the Fiscal Year 2025-2026 Work Plan for a new agency-wide customer service portal. • Headquarters Educational Display – (Carried over from FY 23/24) Develop a Board approved design for the hands-on educational display for the outdoor patio by June 30, 2025. UPDATE: Complete. Options were presented to the Administration Committee in March 2025 and approved by the Board. • Regional Sewer Spill Training – Conduct regional sanitary sewer spill training for the collection system by June 30, 2025. UPDATE: Complete. The training took place on May 5 and 6 with 67 participants from 19 local and regional agencies participating. 2. Environmental Stewardship • Plant No. 2 Process Facilities Seismic Resilience – Select a consultant for the Plant No. 2 Process Facilities Seismic Resiliency Study by December 31, 2024. UPDATE: Complete. Selected a consultant for the Plant No. 2 Process Facilities Seismic Resiliency Study and conducted the kickoff meeting on November 14, 2024. • Urban Runoff Optimization Study – Receive draft Urban Runoff Study identifying opportunities within Orange County Water District (OCWD), County General Manager’s FY 2024-2025 Work Plan June 25, 2025 Page 3 of 5 of Orange, and OC San’s service area for additional dry weather urban runoff by June 30, 2025. UPDATE: Complete. Received the draft Urban Runoff Study in March and the final on May 30, 2025. • Enforcement Response Plan – Update pretreatment/source control enforcement response plan in alignment with State of California’s 2024 water quality enforcement guidance document for legal review by June 30, 2025. UPDATE: Complete. The legal team has reviewed OC San’s current Pretreatment Enforcement Response Plan for consistency with the 2024 State Board’s Water Quality Enforcement guidance document. However, the guidance document was further revised November 2024 by the State Board. Thus, staff will re-engage the legal team to account for the recent changes to the Policy during a future GM work plan cycle. • Pretreatment Management – Expand OC San’s Pretreatment Honor Roll program to include wastehaulers by June 30, 2025. UPDATE: Complete. The Class of 2024 includes 43 permittees, of which two are wastehauling companies. Of the 43 honorees, 31 were Silver Awardees, meaning that they each had four consecutive years of compliance at a minimum. • Food Waste – Finalize Memorandum of Understanding (MOU) with Orange County Waste and Recycling by December 31, 2024. Agree on deal points for a cooperative agreement and make go/no-go decision to move forward by June 30, 2025. UPDATE: Complete. The MOU with deal points was finalized and a cooperative agreement was signed by OC San. 3. Wastewater Management • Plant No. 1 Distributed Control System Human Machine Interface (HMI) – Complete the conversion of the Plant No. 1 HMI system from CRISP to ABB by June 30, 2025. UPDATE: Carry Over. Completed the conversion of 15 percent of the areas at Plant No. 1. Conversion was delayed due to a programming standard change. Will complete the conversion of the Plant No. 1 HMI system by March 31, 2026. General Manager’s FY 2024-2025 Work Plan June 25, 2025 Page 4 of 5 • Deep Well Injection – Evaluate the initial feasibility of deep well injection of biosolids. Issue and evaluate Request for Information (RFI) for potential deep well injection design-build-operate vendors and review permitting requirements by June 30, 2025. UPDATE: Complete. Evaluated the initial feasibility of biosolids deep well injection. Evaluated the hydrogeological feasibility of Plant No. 1, performed a general feasibility of Plant No. 2, issued an RFI to potential deep well injection design-build-operate vendors and evaluated responses, and reviewed permitting requirements. • Supercritical Water Oxidization – (Carried over from FY 23/24) Complete the commissioning and begin demonstration of the pilot project by March 31, 2025, subject to regulatory permitting. Publicize project status. UPDATE: Carry Over. OC San personnel witnessed the operation of a reduced capacity unit in October. Equipment planned for installation in summer 2025 followed by commissioning and demonstration testing. Publicizing will continue following installation. • Property Management – Complete a physical assessment of all current OC San easements and rights-of-way. Document the assessment in written and visual forms as part of the OC San easement management program. Complete the assessment and report by June 30, 2025. UPDATE: Complete. Request for Proposal was completed; consultant was selected to begin assessments on January 22, 2025. Assessment and report are anticipated to be completed by June 30, 2025. 4. Workplace Environment • Staff Training – Create development plans for each employee with associated training plans by June 30, 2025. UPDATE: Complete. Training was held for employees and management on how to create, track, and approve Individual Development Plans (IDP) in OC San's performance management system. A performance goal was also integrated as part of the evaluation process for management. It is anticipated that all employees will have an IDP by June 30, 2025. • Scanning and Paper Reduction – Complete Scope of Work for Phase III, issue a Purchase Order Agreement Request for Proposal and award the General Manager’s FY 2024-2025 Work Plan June 25, 2025 Page 5 of 5 contract for implementation of the trusted system, Phase III for Environmental Services. Complete Phase III by June 30, 2025. UPDATE: Complete. Awarded a Purchase Order Agreement to ECS Imaging, Inc. utilizing the California Multiple Award Schedules. ECS Imaging is working with Environmental Services on Phase III and will be completed prior to June 30, 2025. • Labor Agreements – Complete all labor agreements for all labor groups by June 30, 2025. UPDATE: Complete. In September 2024, the Board approved Laura Drottz Kalty, Liebert Cassidy Whitmore, to serve as OC San’s Chief Negotiator. Staff held several closed session meetings with the Board to receive direction and negotiation parameters and met with all labor groups to meet and confer over successor agreements. It is anticipated that all labor agreements will be completed by June 30, 2025. • OSHA Voluntary Protection Program (VPP) certification for Plant No. 2 – Apply for VPP certification for Plant No. 2 by June 30, 2025. UPDATE: Complete. The Voluntary Protection Program (VPP) application will be submitted by June 30, 2025. In preparation for a successful VPP application, staff attended a Cal/OSHA VPP workshop, completed a comprehensive third-party safety audit in December 2024, prioritized completion of the audit findings and increased workplace inspections leading up to Cal/OSHA’s onsite visit. • Employee Engagement Survey – Conduct an employee engagement survey by June 30, 2025, to gather feedback on workplace environment satisfaction, communication effectiveness, recognition programs, and professional development opportunities. Utilize survey results to identify areas for improvement and develop action plans aimed at enhancing employee engagement and satisfaction levels. UPDATE: Complete. Survey was completed in October with results reported to management, staff, and the Board in November 2024. Identified action items are being implemented and will be reported back to the Board at the end of the fiscal year. RCT:clr STEERING COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4360 Agenda Date:6/25/2025 Agenda Item No:17. FROM:Robert Thompson, General Manager SUBJECT: GENERAL MANAGER’S FY 2025-2026 WORK PLAN GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the General Manager’s FY 2025-2026 Work Plan. BACKGROUND Each year,the General Manager prepares a work plan of activities supporting Orange County Sanitation District’s (OC San)strategic goals and initiatives to be accomplished during the fiscal year. The General Manager’s FY 2025-2026 includes 21 individual goals under four categories:Business Principles, Environmental Stewardship, Wastewater Management, and Workplace Environment. RELEVANT STANDARDS ·Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard ·Plan for and execute succession, minimizing vacant position times ·Cultivate a highly qualified, well-trained, and diverse workforce ·Maintain and adhere to appropriate internal planning documents (Biosolids,Odor,and Energy Master Plans) ·Use all practical and effective means for resource recovery PRIOR COMMITTEE/BOARD ACTIONS May 2025 - Received and filed the General Manager’s FY 2025-2026 Proposed Work Plan. ADDITIONAL INFORMATION The General Manager’s proposed work plan includes 21 goals for the fiscal year,two of which are carried over from the previous work plan. Orange County Sanitation District Printed on 6/18/2025Page 1 of 2 powered by Legistar™ File #:2025-4360 Agenda Date:6/25/2025 Agenda Item No:17. FINANCIAL CONSIDERATIONS All items included in the General Manager’s Work Plan are budgeted in the FY 2025-2026 Budget. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·General Manager’s FY 2025-2026 Work Plan Orange County Sanitation District Printed on 6/18/2025Page 2 of 2 powered by Legistar™ June 25, 2025 TO: Chairman and Members of the Board of Directors FROM: Robert C. Thompson General Manager SUBJECT: General Manager’s FY 2025-2026 Work Plan I am pleased to present my proposed Work Plan for Fiscal Year 2025-2026. The plan has been developed to support the Strategic Plan and is organized under four Strategic Planning categories: Business Principles, Environmental Stewardship, Wastewater Management, and Workplace Environment. The 21 goals proposed for next year include two goals from the previous year and new goals that will ensure our operations are safe and efficient. In addition, we will continue leading the way in innovation, financial management, and work force development while maintaining our level of service. 1. Business Principles • CIP Staffing Plan – Create a Capital Improvement Program (CIP) staffing plan by December 31, 2025, to minimize Supplemental Engineering Services, improve succession planning, and streamline the project delivery process. • Customer Service Portal – Complete the project Scope of Work, conduct a Request for Proposal, and award a contract to create a customer service portal by June 30, 2026. The portal will allow external stakeholders to access information, manage accounts, and interact with OC San’s services to improve convenience and service efficiency. • Small and Replacement Projects Funding Process Improvement – Develop a new process for funding small replacement and repair projects to create more transparency, efficiency, and budget control by December 31, 2025. • Operational AI Opportunities – Identify and prioritize opportunities to optimize OC San administrative, operational and treatment processes through the application of Artificial Intelligence (AI). This may include leveraging historical SCADA data, CMMS data, LIMs data, and potentially visual information for an AI system that can prompt operators by June 30, 2026. General Manager’s FY 2025-2026 Proposed Work Plan June 25, 2025 Page 2 of 3 • Cybersecurity – Conduct a cyber penetration test and red team assessment of the process control systems by June 30, 2026. • Delinquent Fee Policies for Discharge Permits – Update OC San ordinances and policies regarding delinquent fees and penalties for discharge permits by March 31, 2026. • Digital Asset Management – Receive final technical memos for proposed asset database improvements and risk framework for major, critical assets by June 30, 2026. • Debt Financing – Identify and pursue debt refunding opportunities that reduce costs for OC San and its ratepayers. If refunding criteria are met, complete the transaction by March 31, 2026. 2. Environmental Stewardship • Vehicle Mobility Study – Conduct a study to right-size OC San’s transportation fleet and support compliance with clean air standards by June 30, 2026. • Fats, Oil, and Grease (FOG) Outreach – Develop updated Fats, Oils and Grease outreach and compliance materials for food service establishments within OC San service area by June 30, 2026. • Pretreatment Information Management System – Develop a Scope for Work for a Pretreatment Information Management System to replace the existing system by June 30, 2026. • Industrial Waste Survey – Update the Industrial Waste Survey program to utilize information management tools to gather business licensing information to more effectively identify sewer users that are required to have discharge permits by June 30, 2026. 3. Wastewater Management • Plant No. 1 Distributed Control System Human Machine Interface – (Carried over from FY 24/25) Transition Plant No. 1 to the ABB Distributed Control System under project J-120 by March 31, 2026. General Manager’s FY 2025-2026 Proposed Work Plan June 25, 2025 Page 3 of 3 • Property Management – Conduct surveys of properties with identified encroachments or access limitations to OC San’s property rights by June 30, 2026. • Supercritical Water Oxidization – (Carried over from FY 24/25) Complete the six-month vendor demonstration of the six-ton Supercritical Water Oxidation unit by March 31, 2026. • Biosolids Deep Well Injection – (1) Initiate Phase 1 biosolids deep well injection permitting process by October 31, 2025, and (2) develop the outreach Scope of Work for Phase 1 of the biosolids deep well injection program by June 30, 2026. • High Flow Exercise – Develop and conduct a comprehensive high flow exercise by June 30, 2026, to evaluate Emergency Operation Center performance, processes, and operational efficiency. This exercise will simulate high influent wastewater emergencies and ruptures affecting the Santa Ana River Interceptor (SARI) trunkline to ensure preparedness and coordination among all relevant departments and agencies. 4. Workplace Environment • Physical Security Master Plan – Develop a physical security master plan based on findings from past audits and surveys with a focus on mitigating risk, compliance with applicable regulations and standards, and enhancing security measures in OC San facilities and operations by June 30, 2026. • Operator Certification Support – Develop and implement a wastewater laboratory and data science training curriculum to support wastewater operator certification by June 30, 2026. • Vocational Training – Investigate partnership opportunities with vocational training institutions to enhance workforce sourcing efforts, with a focus on addressing hard-to-fill positions by June 30, 2026. RCT:clr BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4219 Agenda Date:6/25/2025 Agenda Item No:FC-1 FROM:Robert Thompson, General Manager Originator: Kelly A. Lore, Clerk of the Board SUBJECT: APPROVAL OF MINUTES - ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve Minutes of the Regular meeting of the Orange County Sanitation District Financing Corporation held March 27, 2024. BACKGROUND In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting will be provided to the Directors for subsequent approval at the following meeting. RELEVANT STANDARDS ·Resolution No. OC SAN 24-09 ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·March 27, 2024 Orange County Sanitation District Financing Corporation meeting minutes Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION BOARD OF DIRECTORS MINUTES MARCH 27, 2024 Board Room Administration Building 10844 Ellis Avenue Fountain Valley, CA 92708 (714) 593-7433 BOARD OF DIRECTORS Minutes March 27, 2024 Page 2 of 3 ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION CALL TO ORDER Chair Wanke called the Board of Directors, Orange County Sanitation District Financing Corporation meeting to order at 6:18 p.m. ROLL CALL AND DECLARATION OF QUORUM Kelly Lore, Secretary of the Financing Corporation, announced that the members of the Orange County Sanitation District Board of Directors were each being compensated $ 300.00 for the Board of Directors Meeting; and no additional compensation for the Financing Corporation Meeting. The Secretary declared a quorum present as follows: PRESENT: Joyce Ahn, Brad Avery, Debbie Baker, Pat Burns, Rose Espinoza, Stephen Faessel, Ryan Gallagher, Glenn Grandis, Phil Hawkins, Stephanie Klopfenstein, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Robbie Pitts, David Shawver, Schelly Sustarsic, Chad Wanke, Bruce Whitaker and John Withers ABSENT: Doug Chaffee, Jon Dumitru, Johnathan Ryan Hernandez, Farrah Khan and Scott Minikus APPROVAL OF MINUTES FC-1 APPROVAL OF MINUTES - ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION Originator: Kelly Lore MOVED, SECONDED, AND DULY CARRIED TO: 2024-3539 Approve Minutes of the Regular meeting of the Orange County Sanitation District Financing Corporation held June 28, 2023. AYES: Joyce Ahn, Brad Avery, Debbie Baker, Pat Burns, Rose Espinoza, Stephen Faessel, Ryan Gallagher, Glenn Grandis, Phil Hawkins, Stephanie Klopfenstein, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Robbie Pitts, David Shawver, Schelly Sustarsic, Chad Wanke, Bruce Whitaker and John Withers NOES: None ABSENT: Doug Chaffee, Jon Dumitru, Johnathan Ryan Hernandez, Farrah Khan and Scott Minikus ABSTENTIONS: None BOARD OF DIRECTORS Minutes March 27, 2024 Page 3 of 3 Kelly A. Lore, MMC Secretary of the Financing Corporation NON-CONSENT: FC-2 WASTEWATER REFUNDING REVENUE OBLIGATIONS, SERIES 2024-3508 2024A Originator: Wally Ritchie Mr. Ritchie provided a verbal overview of this item. MOVED, SECONDED, AND DULY CARRIED TO: Adopt Resolution No. FC-30 entitled: “A Resolution of the Board of Directors of the Orange County Sanitation District Financing Corporation authorizing the execution and delivery by the Corporation of an Installment Purchase Agreement and a Trust Agreement in connection with the Orange County Sanitation District Wastewater Refunding Revenue Obligations, Series 2024A, authorizing the execution and delivery of such Revenue Obligations evidencing principal in an aggregate amount of not to exceed $157,605,000 and authorizing the execution of necessary documents and related actions”. AYES: Joyce Ahn, Brad Avery, Debbie Baker, Pat Burns, Rose Espinoza, Stephen Faessel, Ryan Gallagher, Glenn Grandis, Phil Hawkins, Stephanie Klopfenstein, Christine Marick, Jordan Nefulda, Andrew Nguyen, Robert Ooten, Robbie Pitts, David Shawver, Schelly Sustarsic, Chad Wanke, Bruce Whitaker and John Withers NOES: None ABSENT: Doug Chaffee, Jon Dumitru, Johnathan Ryan Hernandez, Farrah Khan and Scott Minikus ABSTENTIONS: None Chair Wanke adjourned the meeting of the Board of Directors, Orange County Sanitation District Financing Corporation at 6:19 p.m. Submitted by: BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4220 Agenda Date:6/25/2025 Agenda Item No:FC-2 FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: ANNUAL STATUS REPORT OF THE ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Receive and file the Annual Status Report of the Orange County Sanitation District Financing Corporation. BACKGROUND Per Section 2.05 of the Orange County Sanitation District (OC San)Financing Corporation,the Board of Directors will conduct at least one annual meeting where staff shall provide an activity report and conduct other business as necessary. As of June 30,2025,OC San will have approximately $572 million in outstanding debt that is scheduled to be paid off prior to June 30, 2040. OC San did not issue any new money debt during the 2024-25 Fiscal Year and no new money debt issuances are planned for the 2025-26 Fiscal Year.OC San staff continually review the debt issuances and look for potential savings through refunding existing debt. A summary of OC San debt history is provided later in this agenda report. RELEVANT STANDARDS ·Ensure the public’s money is wisely spent ·Ensure that investment proposals and decisions are based on clearly defined standards ·Sound engineering and accounting practices, complying with local, state, and federal laws ·Produce appropriate financial reporting ADDITIONAL INFORMATION OC San began issuing Certificates of Participation (COPs)in 1990.These COPs were part of the long-term financing plan that included both variable interest rate and traditional fixed rate borrowing. There remains no variable interest rate COPs at OC San.Following are the current outstanding debtOrange County Sanitation District Printed on 6/18/2025Page 1 of 2 powered by Legistar™ File #:2025-4220 Agenda Date:6/25/2025 Agenda Item No:FC-2 There remains no variable interest rate COPs at OC San.Following are the current outstanding debt issues of OC San: Outstanding Debt History In May 2010,OC San issued $80 million of fixed rate Build America Bonds (BABs),Series 2010A,at a true interest cost of 3.68 percent for the issue. $80 Million Outstanding In December 2010,OC San issued $157 million of fixed rate BABs,Series 2010C,at a true interest cost of 4.11 percent for the issue. $23 Million Outstanding In March 2016,OC San issued $146 million of fixed rate COPs,Series 2016A,refunding $163 million of the Series 2009A debt.The true interest cost for the issue is 3.02 percent.$116 Million Outstanding In February 2017,OC San issued $66 million of fixed rate COPs,Series 2017A,refunding $92 million of the Series 2007A debt.The true interest cost for this issue is 2.55 percent.$66 Million Outstanding In July 2021,OC San issued $134 million of fixed rate COPs,Series 2021A,refunding $62 million of the Series 2011A and $102 million of the Series 2018A debt.The true interest cost for the issue is 1.06 percent. $77 Million Outstanding In February 2022,OC San issued $82 million of fixed rate COPs,Series 2022A,refunding $100 million of the Series 2012A and $7 million of the Series 2012B debt.The true interest cost for the issue is 1.59 percent. $81 Million Outstanding In May 2024,OC San issued $140 million of fixed rate COPs,Series 2024A,refunding $30 million of the Series 2014A and $128 million of the Series 2015A debt.The true interest cost for the issue is 2.72 percent. $129 Million Outstanding ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: N/A Orange County Sanitation District Printed on 6/18/2025Page 2 of 2 powered by Legistar™ ADMINISTRATION COMMITTEE Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4348 Agenda Date:6/25/2025 Agenda Item No:18. FROM:Robert Thompson, General Manager Originator: Wally Ritchie, Director of Finance SUBJECT: PROPOSED FISCAL YEAR 2025-26 BUDGET UPDATE GENERAL MANAGER'S RECOMMENDATION RECOMMENDATION: Approve the proposed Operating,Capital,Debt Service,and Self-Insurance Budgets for FY 2025-26 as follows: FY 2025-26 Net Operating $ 246,365,399 Self-Insurance $ 6,745,565 Net Capital Improvement Program $ 254,276,633 Debt/COP Service $ 60,431,104 Intra-District Joint Equity Purchase/Sale (1) $ 3,500,000 Other Requirements $ 10,000,000 TOTAL $ 581,318,701 (1)Cash to/from Revenue Area 14 (RA14)in exchange for capital assets to/from Consolidated Revenue Area 15 (RA15) BACKGROUND The FY 2025-26 Proposed Budget Update is included for the Committee's consideration.The budget has been presented to the Operations Committee at the regular June meeting in order to allow each Standing Committee an opportunity to review the proposal prior to the June Board meeting.Although each Committee has had an opportunity to review the proposal,it remains the responsibility of the Administration Committee to recommend approval.The Administration Committee is requested to recommend that the Board of Directors approve this budget at the June 26,2025,Board of Directors meeting. RELEVANT STANDARDS ·Ensure the public’s money is wisely spent ·Produce appropriate financial reporting - Operating and CIP budgets every two years Orange County Sanitation District Printed on 6/18/2025Page 1 of 3 powered by Legistar™ File #:2025-4348 Agenda Date:6/25/2025 Agenda Item No:18. PROBLEM The Orange County Sanitation District (OC San)cannot maintain and monitor its financial condition, operations,and future capital improvements without examination and transparency into its resources, revenues, reserves, and outlays, and cannot continue to operate without an approved budget. PROPOSED SOLUTION Approve the Proposed FY 2025-26 Budget Update. TIMING CONCERNS OC San is currently operating in the final year of its two-year budget which runs through June 30, 2025.The new budget will be effective July 1 of this year upon adoption by the Board of Directors in June. RAMIFICATIONS OF NOT TAKING ACTION OC San will not have an updated budget to be able to carry out its financial fiduciary duties or other operations beyond June 30, 2025. PRIOR COMMITTEE/BOARD ACTIONS June 2023 -Adopted the proposed Operating,Capital,Debt Service,and Self-Insurance Budgets for FY 2024-25 and FY 2025-26 as follows: FY 2024-25 FY 2025-26 Net Operating $ 232,674,493 $ 239,114,716 Self-Insurance - Workers’ Comp. $ 1,124,029 $ 1,182,835 Self-Insurance - Property & Gen. Liability $ 4,402,500 $ 4,767,000 Net Capital Improvement Program $ 223,075,113 $ 279,436,128 Debt/COP Service $ 61,027,421 $ 60,431,104 Intra-District Joint Equity Purchase/Sale (1) $ 3,500,000 $ 3,500,000 Total $ 525,803,556 $ 588,431,783 (1)Cash to/from Revenue Area 14 (RA14)in exchange for capital assets to/from Consolidated Revenue Area 15 (RA15) ADDITIONAL INFORMATION OC San’s proposed FY 2025-26 operating ($246.3 million)and capital improvement ($254.3 million) budget is proposed at $500.6 million;a 3.7 percent ($19.1 million)decrease from the FY 2025-26 adopted budget that was approved last year as the second year of the adopted two-year budget. This overall decrease is primarily attributable to a decrease of $25 million in net CIP Outlay offset by an $8.3 million increase in operating costs. Orange County Sanitation District Printed on 6/18/2025Page 2 of 3 powered by Legistar™ File #:2025-4348 Agenda Date:6/25/2025 Agenda Item No:18. ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Proposed Budget Update FY 2025-26 ·Presentation Orange County Sanitation District Printed on 6/18/2025Page 3 of 3 powered by Legistar™ Orange County Sanitation District, California Budget Update Fiscal Year 2025-26 MISSION STATEMENT “To protect public health and the environment by providing eective wastewater collection, treatment, and recycling.” July 1, 2025 through June 30, 2026 For Fiscal Year The Government Finance Ocers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to the Orange County Sanitation District, California, for its biennial budget for the biennium beginning July 1, 2024. In order to receive this award, a government unit must publish a budget document that meets program criteria as a policy document, as an operations guide, as a nancial plan, and as a communication device. GFOA BUDGET PRESENTATION AWARD BUDGET UPDATE - FISCAL YEAR 2025-26 TABLE OF CONTENTS OC San Service Area.......................................................................................................................................................... Board of Directors................................................................................................................................................................ Board Committees............................................................................................................................................................... Orange County Sanitation District Organization Chart.............................................................................................. Administrative Ocials....................................................................................................................................................... Message from the General Manager.............................................................................................................................. Finance Summary Financial Overview & Budgetary Issues........................................................................................................................ Where the Money Comes From....................................................................................................................................... Funding Sources by Category.......................................................................................................................................... Where the Money Goes..................................................................................................................................................... Funding Uses by Category................................................................................................................................................ Collection, Treatment & Recycling Process Overview............................................................................................ Strategic Planning.............................................................................................................................................................. Asset Management............................................................................................................................................................ Capital Improvement Program....................................................................................................................................... Debt Financing Program.................................................................................................................................................. Operating Expenses.......................................................................................................................................................... Departments Summary................................................................................................................................................................................. General Manager’s Oce.................................................................................................................................................. Administrative Services..................................................................................................................................................... Communications ................................................................................................................................................................. Human Resources................................................................................................................................................................ Environmental Services...................................................................................................................................................... Engineering........................................................................................................................................................................... Operations and Maintenance........................................................................................................................................... Appendix Cash Flow Projection........................................................................................................................................................ Project Summary................................................................................................................................................................ Capital Improvement Expenditure Graphs................................................................................................................. Summary of Capital Requirements............................................................................................................................... New Project Descriptions.............................................................................................................................................. Capital Equipment Budget Summary.......................................................................................................................... Capital Equipment Budget Detail................................................................................................................................. Levels of Service............................................................................................................................................................. Self-Funded Insurance Plans....................................................................................................................................... Historical Stang Summary.......................................................................................................................................... Historical Stang Detail................................................................................................................................................ Appropriations Limit....................................................................................................................................................... Miscellaneous Statistics................................................................................................................................................ i ii iii iv v vi 1 1 3 3 5 5 7 8 10 13 14 15 13 18 20 22 24 26 28 30 32 A-1 A-1 A-3 A-4 A-5 A-6 A-10 A-16 A-18 A-20 A-22 A-23 A-24 A-35 BUDGET UPDATE - FISCAL YEAR 2025-26 OC SAN SERVICE AREA Orange County Sanitation District Service Area and Reclamation Plant Locations in Orange County, CA BUDGET UPDATE - FISCAL YEAR 2025-26 i OC SAN BOARD OF DIRECTORS Anaheim Brea Buena Park Cypress Fountain Valley Fullerton Garden Grove Huntington Beach Irvine La Habra La Palma Los Alamitos Newport Beach Orange Placentia Santa Ana Seal Beach Stanton Tustin Villa Park Carlos A. Leon Christine Marick Joyce Ahn Scott Minikus Glenn Grandis Jamie Valencia Stephanie Klopfenstein Pat Burns Melinda Liu Jose Medrano Debbie Baker Jordan Nefulda Erik Weigand Jon Dumitru Chad Wanke Johnathan Ryan Hernandez Lisa Landau David Shawver Ryan Gallagher Jordan Wu Active DirectorCities Robert Ooten Andrew Nguyen John Withers Tom Lindsey Sanitary/Water Districts Costa Mesa Sanitary District (CMSD) Midway City Sanitary District (MCSD) Irvine Ranch Water District (IRWD) Yorba Linda Water District (YLWD) County Member of the Board of Supervisors Doug Chaee BUDGET UPDATE - FISCAL YEAR 2025-26 ii Christine Marick, Chair Glenn Grandis, Vice-Chair Melinda Liu Jose Medrano Jordan Nefulda Andrew Nguyen David Shawver Chad Wanke Erik Weigand John Withers Jordan Wu Jordan Wagher, Board Chair Jon Dumitru, Board Vice-Chair Ryan Gallagher, Board Chair Jon Dumitru, Board Vice-Chair Pat Burns, Chair, Operations Committee Christine Marick, Chair, Administration Committee Chad Wanke Glenn Grandis John Withers Pat Burns, Chair Bob Ooten, Vice-Chair Joyce Ahn Debbie Baker Doug Chaee Johnathan Ryan Hernandez Stephanie Klopfenstein Lisa Landau Carlos A. Leon Tom Lindsey Scott Minikus Jamie Valencia Ryan Gallagher, Board Chair Jon Dumitru, Board Vice-Chair OPERATIONS COMMITTEE STEERING COMMITTEE ADMINISTRATION COMMITEE BOARD COMMITTEES BUDGET UPDATE - FISCAL YEAR 2025-26 iii ORGANIZATION CHART BUDGET UPDATE - FISCAL YEAR 2025-26 iv ADMINISTRATIVE OFFICIALS General Manager Assistant General Manager Director of Engineering Director of Environmental Services Director of Finance Director of Human Resources Director of Operations & Maintenance Director of Communications Robert Thompson Lorenzo Tyner Mike Dorman Lan Wiborg Wally Ritchie Laura Maravilla Riaz Moinuddin Jennifer Cabral BUDGET UPDATE - FISCAL YEAR 2025-26 v Honorable Chair and Board of Directors: It is a privilege to present the Orange County Sanitation District’s (OC San) Budget Update for Fiscal Year 2025–26. This update outlines our strategic direction and nancial plan as we carry forward our mission to protect public health and the environment by providing eective wastewater collection, treatment, and recycling. OC San remains committed to its long-standing values of service, innovation, and stewardship. This budget reects our continued focus on long-term infrastructure investment, nancial sustainability, and operational performance, all while maintaining aordability for the 2.6 million residents we serve. Long-Term Vision and Strategic Planning The FY 2025–26 budget aligns with OC San’s Strategic Plan, most recently updated in November 2023. The plan denes long-range goals in environmental stewardship, infrastructure resiliency, workplace development, and community partnerships. This year’s budget reects measurable progress in these areas through targeted investments in capital improvements, workforce development, and system modernization. Guided by our Asset Management Program and 20-year Capital Improvement Plan (CIP), the agency continues to address aging infrastructure while planning for future demands. The FY 2025–26 budget supports essential upgrades to reclamation facilities, pump stations, trunk sewers, and administrative campuses, ensuring long-term operational integrity and service reliability. Strategic Capital Investments OC San’s proposed operating and captial improvement budget for FY 2025–26 is $500.6 million. A signicant portion—$254 million—is dedicated to capital projects, with an emphasis on replacing and rehabilitating aging systems, improving energy eciency, and ensuring regulatory compliance. Major projects include: These capital eorts are key to OC San’s $3.6 billion, ten-year infrastructure renewal strategy—one of the most ambitious in the agency’s history. Responsible Debt Management and Financial Stewardship OC San continues to demonstrate strong nancial discipline. With total outstanding Certicates of Participation (COP) debt held at $572 million, no new debt issuance is planned in FY 2025–26. Instead, capital projects are being nanced using a combination of reserves and current service fee revenue. June 3, 2025 Rehabilitation of Plant No. 1’s Headworks and Sedimentation Basins, vital vital wastewater processing and operational eciency. Primary treatment upgrades and power system enhancements at Plant No. 2, supporting resiliency and Groudwater Replensihment System (GWRS) integration. Replacement of critical pump stations, including Seal Beach and Bay Bridge. Construction of a new laboratory and operations complex, enhancing functionality and long-term operational capacity. BUDGET UPDATE - FISCAL YEAR 2025-26 vi OC San is also exploring opportunities to renance callable debt, which could generate long-term interest savings. This prudent approach helps preserve our AAA credit ratings and ensures exibility in future nancial planning. The FY 2025–26 single-family residential sewer service fee is proposed at $384 per year, reecting a modest increase of 3.5 percent in accordance with the Board-approved rate structure. This adjustment supports necessary investments while maintaining aordability and scal balance. Commitment to Performance and Eciency Operational performance and cost containment remain central to OC San’s management approach. The FY 2025–26 operations budget of $246.4 million includes necessary increases to support maintenance, professional services, and labor costs. Nonetheless, stang remains lean with only 664.5 full-time equivalent (FTE) positions—a reduction from historical levels—despite system expansion and increasing regulatory demands. Eciencies have been achieved through technology upgrades, preventive maintenance programs, and streamlined service delivery. Over 25 percent of the budget is dedicated to employee costs, a lower share than most public agencies, reecting OC San’s culture of cost-eectiveness and accountability. Forward Momentum OC San continues to lead in water reuse through our longstanding partnership with the Orange County Water District. Together, we support the GWRS, which now recycles up to 130 million gallons per day—enough to meet the needs of one million residents. With support from both Boards, additional upgrades are underway to optimize integration and delivery of reclaimed ows from Plant No. 2. We also remain focused on innovation in biosolids management, energy independence, cybersecurity, and stormwater coordination, as dened in our Strategic Plan. These eorts will help OC San navigate future challenges while continuing to deliver safe, reliable service to our community. In closing, I wish to express my appreciation to the Board of Directors for their leadership and vision, and to OC San’s sta for their dedication and professionalism. The FY 2025–26 Budget Update reects our shared commitment to scal integrity, environmental protection, and the highest standards of public service. Rob Thompson General Manager Orange County Sanitation District BUDGET UPDATE - FISCAL YEAR 2025-26 vii Budget Overview OC San’s FY 2025-26 operating and capital improvement budget is proposed at $500.6 million, a $16.9 million decrease from the FY 2025-26 adopted budget. The decrease is mostly comprised of a $25.1 million, or 9.0 percent net decrease in cash outlays for construction projects, o set by a 3.5 percent, or $8.3 million increase in operating expenses. The uctuation in capital outlay requirements over the next two years is attributable to the timing of the construction schedule on the implementation of the overall combined ten-year, $3.6 billion CIP. This budget continues to reect the agency’s ongoing eorts to meet the operational standards and regulatory requirements. Stang levels are being proposed at 664.5 full time equivalent (FTE) positions, an increase of 1 FTE position over the 663.5 FTE stang level that was approved for FY 2024-25. Financing OC San uses long-term Certicates of Participation (COP) for nancing capital improvements that cannot be completely funded from current revenue. Before any new debt is issued, the impact of debt service payments on total annual xed costs is analyzed. Total COP indebtedness is currently at $572 million. There may be opportunities to renance maturing and callable debt during FY 2025-26 that will produce savings over the life of the debt. No new money debt nancings are currently forecasted to assist in the funding of the $3.6 billion in capital improvements required over the next ten years. Stang Reecting the organization’s commitment to eciency and providing the expected high level of service, the budget includes an increase of one authorized full-time positions for FY 2025-26. Total lled positions will not exceed 664.5 full time equivalent (FTE) sta positions. This stang level continues to reect a signicant reduction from the Fiscal Year 1995-96 approved stang level of 678 positions. Overall personnel costs for FY 2025-26 will approximate the original adopted budget due to reductions in labor and retirement premiums to Orange County Employees’ Retirement System (OCERS) following the retirement of approximately seventy employees in the last two years. Costs for medical insurance and workers compensation benets are also expected to remain the same as the level originally approved. OC San will continue to eectively manage these expenses with approximately 26 percent of the budget allocated to employee costs, much less than most other government agencies. Cost of Treatment The agency’s two reclamation plants, located in Fountain Valley and Huntington Beach, process a combined 185 million gallons of wastewater each day generated by approximately 2.6 million people in central and northwest Orange County. The FY 2025-26 proposed budget to operate, maintain and manage our sewage collection, treatment and disposal system is $246.4, an increase of 3.5 percent, or $8.3 million, from the previously adopted budget. Sewer Service Fees The FY 2025-26 single family residential rate, the underlying basis for all sewer rates, is proposed at $384 a year. This represents an increase of $13 or 3.5 percent per the rate structure approved by the Board of Directors. Groundwater Replenishment System (GWRS) The OC San Strategic Plan includes water reclamation. Partnered with the Orange County Water District (OCWD), OCWD completed the GWRS, the nation’s largest water reclamation project, in January 2008. The original GWRS facility reclaimed 70 mgd. OC San and OCWD equally shared the expenses of this project. Initial expansion of the GWRS increased the production of reclaimed water to 100 mgd. The project, which was funded entirely by the OCWD, was completed in 2015. OC San is directing all reclaimable ows from Plant No. 1 to OCWD in support of providing maximum amounts of treated wastewater for reclamation. The plan to achieve the nal expansion of the GWRS was approved by both OC San and OCWD Board of Directors in 2016. The nal expansion of GWRS brings the total production of reclaimed water to 130 mgd. Since OC San has maximized the available reclaimable wastewater treated at Plant No. 1, secondary euent from Plant No. 2 will be sent to the GWRS for reclamation. Modication of existing Plant No. 2 Headworks, a new Plant Water pump station and construction of new pumping, equalization and conveyance facilities will be funded by the OCWD. FINANCIAL SUMMARY/OVERVIEW AND BUDGETARY ISSUES BUDGET UPDATE - FISCAL YEAR 2025-26 1 As the Headworks Modication and Plant Water project is impacting OC San’s critical infrastructure, OC San will manage the design and construction of these projects and were reimbursed by OCWD up to $50 million. The nal expansion of the GWRS went online in 2023. Capital Improvement Program (CIP) The total net CIP budget for FY 2025-26 is being proposed at $254.3 million, a decrease of $25.1 million from the previously approved FY 2025-26 budget primarily due to changes in project schedules and estimates that result in deferred spending over the next 10 years. OC San’s Capital Improvement Program will provide needed improvements and rehabilitation across all of our asset areas, including the following highlights: Operating Budget Increase - $8.3M The operations budget for the collection, treatment, and disposal of wastewater is proposed at $246.4 million, a $8.3 million (3.5 percent) increase above 2025-26 adopted budget. The overall increase to the operating budget is primarily attributable to the following specic areas: Professional Services – $4.2M Increase The increase is primarily due to delays in projects and higher than anticipated costs for consulting service for the development of a progressive design build program, and a survey of all OC San easements. Repairs and Maintenance – $2.0M Increase This expense category includes parts and services for repairing aging treatment plant and collection facilities and reects base budgets for equipment maintenance as well as out-sourced annual service contracts and maintenance agreements. The FY 2025-26 budget increase over the adopted budget for FY 2025-26 is due to increased cost of goods and service needed to maintain the reclamation plants. Rehabilitate the headworks, primary treatment, and secondary treatment at Plant No. 1. Replace a third of the primary treatment facilities, rehabilitate the aeration basins, and renew the digester complex via rehabilitation and the construction of six new digesters at Plant No. 2. Construct new administrative facilities including a new Operations & Maintenance Complex and a new Laboratory. Replace or rehabilitate OC San’s aging pump stations and trunk sewers in the collections system, including important full replacements of Edinger, Seal Beach, and Bay Bridge Pump Stations. 233233233 227227227 240240240 246246246 FY 2024-25 Adopted FY 2024-25 Projected FY 2025-26 Adopted FY 2025-26 Proposed Series 1 0 50 100 150 200 250 300 Operating Budget Comparison (Amount $ in Millions) FINANCIAL SUMMARY/OVERVIEW AND BUDGETARY ISSUES BUDGET UPDATE - FISCAL YEAR 2025-26 2 238 Funding Sources by Category (In Millions) $ .$ .$ . ... ... ... ... ... --- ... $ .$ .$ . Service Fees Property Taxes Permit User Fees Capital Capacity Charges Interest Intradistrict Transfers Debt Proceeds Other Revenue Total Property TaxesProperty Taxes: 21%: 21%Property Taxes: 21% Interest & MiscInterest & Misc: 7%: 7%Interest & Misc: 7% FeesFees: 72%: 72%Fees: 72% Where The Money Comes From FINANCIAL SUMMARY/OVERVIEW AND BUDGETARY ISSUES BUDGET UPDATE - FISCAL YEAR 2025-26 Category 2024-25 Adopted 2025-26 Adopted 2025-26 Proposed 3 OC San has a variety of revenue sources available for operating and capital expenses. The major revenue sources are: General Service Fees – $381.6M User fees are ongoing fees for service paid by customers connected to the sewer system and are the primary source of OC San’s revenue. A property owner, or user, does not pay user fees until connected to the sewer system and receiving services. Once connected, users are responsible for their share of the system’s costs, both xed and variable, in proportion to their demand on the system. These fees are for both Single Family Residences (SFR) and Multiple Family Residences (MFR). Property Taxes – $123.7M The County of Orange is permitted by State law (Proposition 13) to levy taxes at one percent of full market value (at time of purchase) and can increase the assessed value no more than two percent per year. OC San receives a share of the basic levy proportionate to what was received in the 1976 to 1978 period, less $3.5 million, the amount that represents the State’s permanent annual diversion from special districts to school districts that began in 1992-93. OC San’s share of this revenue is dedicated for the payment of debt service before other operational expenses. Permit User Fees – $16.6M Permit user fees are paid by large industrial and commercial properties owners connected to the sewer system. These fees are for the owner’s share of the system’s costs, both xed and variable, in proportion to the user’s demand on the system. Since the inception of the Permit User Fee Program in 1970, users of OC San’s system that discharge high volumes or high strength wastewater have been required to obtain a discharge permit and pay extra fees for the cost of service received. Capital Facilities Capacity Charges – $21.7M The Capital Facilities Capacity Charge is a one-time charge imposed at the time a building or structure is newly connected to OC San’s system, directly or indirectly, or an existing structure or category of use is expanded or increased. This charge pays for OC San facilities that exist at the time the charge is imposed, or to pay for new facilities to be constructed in the future that will benet the property being charged. Interest Earnings – $26.5M Interest earnings are generated from the investment of accumulated reserves consisting of a cash ow/contingency, a capital improvement, a renewal/ replacement, and a self-insurance reserve. Intradistrict Transfers – $3.5M In accordance with Amendment No. 2 to the Agreement for Purchase and Sale of Capacity Rights in Treatment, Disposal and Sewer Facilities between Irvine Ranch Water District (IRWD) and OC San dated November 15, 1995, ownership is adjusted annually to reect the current equity percentage ownership based on sewage ows. Debt Proceeds – $0.0M Certicates of Participation (COPs) are OC San’s primary mechanism for nancing capital projects. COPs are repayment obligations based on a lease or installment sale agreement. COPs are not viewed as “debt” by the State of California, but rather a share in an installment arrangement where OC San serves as the purchaser. Renancing COPs can be benecial to OC San when there is maturing or callable issues. No new money debt issuances are being proposed as the $3.1 billion in future replacement, rehabilitation, and refurbishment projects anticipated over the next ten years will be adequately funded through current sewer service fee charges and existing reserves. Other Revenue – $14.6M Other revenue includes self-insurance assessments for workers’ compensation and general liability coverage as well as reimbursements from other agencies for shared CIP and operating costs and miscellaneous revenue such as rents and leases. FINANCIAL SUMMARY/OVERVIEW AND BUDGETARY ISSUES BUDGET UPDATE - FISCAL YEAR 2025-26 4 Capital FacilitiesCapital Facilities: 44%: 44%Capital Facilities: 44% OperationsOperations: 42%: 42%Operations: 42% Debt serviceDebt service: 11%: 11%Debt service: 11% OtherOther: 4%: 4%Other: 4% Where the Money Goes $ .$ .$ . ... ... ... ... Capital Improvement Program Operating Expense Debt Service Other Total Outlays Funding Requirements by Category (In Millions) Category FY 2024-25 Adopted FY 2025-26 Adopted FY 2025-26 Proposed FINANCIAL SUMMARY/OVERVIEW AND BUDGETARY ISSUES BUDGET UPDATE - FISCAL YEAR 2025-26 5 8.6 $ 525.4 $ 254.3 $ 581.3$ 587.4 9.5 238.1 $ 279.4 43% BUDGET UPDATE - FISCAL YEAR 2025-26 OC San budgets its funds in four distinct areas: Operating Expenses - $246.4M The proposed budget allocates resources to operate, maintain and manage our sewage collection, treatment, recycling and disposal system, and for any associated administrative or technical requirements. Capital Improvement Program (CIP) - $254.3M To provide an appropriate level of service to OC San’s ratepayers, large capital improvements are required. The CIP provides for the management and implementation of these improvements. The CIP budget includes specic projects, cost estimates, and timelines. The gross CIP project budgets for 2023-24 total $289.0 million; however, the CIP cash outlays, net of savings and deferrals, is $254.3 million. Debt Service - $60.4M This is the cost of repaying debt. Long-term debt nancing allows OC San to complete large multi-year capital projects by providing funds not always immediately available. Currently, OCSD is on track to pay o its $572.0 million outstanding debt by 2040. Other Requirements - $20.2M This item includes self-insurance costs and an amount in accordance with Amendment No. 2 to the Agreement for Purchase and Sale of Capacity Rights in Treatment, Disposal and Sewer Facilities between IRWD and OC San dated November 15, 1995, ownership is adjusted annually to reect the current equity percentage ownership based on sewage ows. FINANCIAL SUMMARY/OVERVIEW AND BUDGETARY ISSUES 6 COLLECTION, TREATMENT, AND RECYCLING PROCESS OVERVIEW OC San’s system includes over 380 miles of sewers that convey wastewater generated within OC San’s service area to its two treatment facilities, Reclamation Plant No. 1 located in the City of Fountain Valley, and Treatment Plant No. 2 located in the City of Huntington Beach. Inuent wastewater undergoes Preliminary Treatment upon entry to the treatment plants where it is ltered through bar screens, and grit and debris are removed. It then ows to Primary Treatment, which consists of large settling basins where solids are settled out, enhanced by the addition of chemicals, and sent to Solids Processing. Wastewater then ows to Secondary Treatment, which is a biological process using either the trickling lter or activated sludge process. Solids removed in Secondary Treatment are also sent to digestion. Methane gas generated during the natural decomposition of the solids in the digesters fuels the Central Power Generation System producing enough electricity to meet two-thirds of the power needed to run both treatment plants. Solids are then dewatered to a 25-30 percent solids consistency, called biosolids, and recycled via direct land application or composting. Up to 130 million gallons per day of secondary euent is sent to the Orange County Water District (OCWD) for recycling in its two treatment processes. The rst is the Groundwater Replenishment System (GWRS), the largest water purication project of its kind in the world, funded jointly by OCWD and OC San. At 130 million gallons per day, the GWRS generates enough pure water to meet the needs of 1 million people. The second is OCWD’s Green Acres Project (GAP), a water recycling eort that provides reclaimed water for landscape irrigation at parks, schools, and golf courses, as well as for industrial uses such as carpet dyeing. The demand for GAP water is about four million gallons per day. BUDGET UPDATE - FISCAL YEAR 2025-26 7 STRATEGIC PLANNING Introduction Driven by the mission, vision, core values, and the Strategic Plan, OC San continues aggressive eorts to meet the sanitation, health, and safety needs of the more than 2.6 million people we serve while protecting the environment where we live. Mission Statement The Mission Statement is the basic foundation that denes why we exist. “To protect public health and the environment by providing eective wastewater collection, treatment, and recycling.” Vision Statement The Vision Statement supports the Mission Statement by expressing a broad philosophy of what the Orange County Sanitation District strives to achieve now and in the future in the delivery of services to our customers, vendors, other agencies, the general public and each other. Orange County Sanitation District will be a leader in: OC San Planning Environment The Orange County Sanitation District (OC San) is a resource recovery agency focused on providing reliable and cost-eective public services. OC San uses a two-year, four-step management process that creates and maintains vision alignment between the Board of Directors, sta, and the public we serve. It all begins with a Strategic Plan developed by the Board and sta that provides guidance and direction for long- term nancial, capital, and operational eorts. Core Values Our Core Values support the Mission and Vision Statements by expressing the values, beliefs, and philosophy that guides our daily actions. They help form the framework of our organization and reinforce our professional work ethic. Providing reliable, responsive, and aordable services in line with customer needs and expectations. Protecting public health and the environment utilizing all practical and eective means for wastewater, energy, and solids resource recovery. Continually seeking eciencies to ensure that the public’s money is wisely spent. Communicating our mission and strategies with those we serve and all other stakeholders. Partnering with others to benet our customers, this region, and our industry. Creating the best possible workforce in terms of safety, productivity, customer service, and training. BUDGET UPDATE - FISCAL YEAR 2025-26 8 Integrity, Inclusion, Honesty, and Respect We aspire to the highest degree of integrity, inclusion, honesty, and respect in our interaction with each other, our suppliers, our customers, and our community. We strive to demonstrate these values in our actions, commitments, and service. Leadership, Teamwork, and Problem Solving We lead by example, acknowledging the value of our resources and using them wisely to achieve our mission. We strive to reach OC San goals through cooperative eorts and collaboration with each other and our constituencies. We work to solve problems in a creative, cost-eective, and safe manner, and we acknowledge team and individual eorts. Customer Service, Transparency, and Accountability We are committed to acting in a timely, accurate, accessible, and transparent manner through excellent customer service. We are committed to act in the best interest of our internal and external stakeholders. Resiliency, Innovation, and Learning We continuously develop ourselves, enhancing our talents, skills, and abilities. We recognize that only through personal growth and development will we progress as an agency and as individuals. Safety We are committed to providing a safe work environment. We will demonstrate leadership, promote individual accountability, and participate actively in the advancement of our health and safety practices. Business Principles Budget Control and Fiscal Discipline Asset Management Cybersecurity Property Management Organizational Advocacy and Outreach Energy Independence Climate and Catastrophic Event Resiliency Food Waste Treatment Water Reuse Environmental Water Quality, Stormwater Management and Urban Runo Resilient Stang Safety and Physical Security Strategic Planning In November 2023, the Board of Directors adopted a new comprehensive strategic plan to steer OC San’s eorts. The Strategic Plan developed by the Board of Directors and sta is updated every two years prior to the start of the budget process, most recently in November 2023. The plan denes the strategic initiatives to be pursued by OC San and provides a basis for long-term nancial, capital, and operational planning. In addition, it provides for long-term continuity of vision as Board and sta members change over the many years it takes to deliver public works infrastructure. Driven by our Mission, Vision and Core Values, this Strategic Plan continues OC San’s aggressive eorts to protect the public health of the more than 2.6 million people we serve while protecting the environment where we live. The Strategic Plan is comprised of four broad categories with fteen policy areas that dene our responsibilities and the services we provide. These areas are: Environmental Stewardship Wastewater Management Chemical Sustainability Biosolids Management Constituents of Emerging Concern Workplace Environment The Strategic Plan is not a departure from the current direction, but rather the well dened iterative update to the direction of OC San. With the adoption of the Strategic Plan, sta will be updating the Asset Management Plan, Capital Improvement Plan, and Financial Plan that are the basis of a two-year budget that will be adopted by the Board of Directors. The Budget goals and the General Manager’s work plan are the accountability steps that measure achievable progress toward the strategic initiatives listed in the Strategic Plan. STRATEGIC PLANNING BUDGET UPDATE - FISCAL YEAR 2025-26 9 Asset Valuation The replacement valuation for all of OC San’s assets was updated in 2018 as part of the 2017 Facilities Master Plan. The table below presents the current valuations of OC San’s assets. The replacement value represents the cost in 2025 dollars to construct similar facilities. The depreciated value is the book value of the assets based on their age. The estimated replacement value in FY 2024-25 is $15.7 billion based on the Engineering News-Record Construction Cost Index (CCI) increase since the 2017 Facilities Master Plan. Planned CIP Outlays The following chart shows the 20-year CIP outlay which includes both current and projected future Capital Improvement Program projects. Additional information on the proposed CIP outlay for Board Authorized Projects is provided in the CIP Budget Request Summary section of this report. The second half of the 20-year CIP outlay is primarily comprised of future projects which are reevaluated and adjusted annually to reect any new information available. ASSET MANAGEMENT Asset Management Program OC San’s Asset Management Program continues to evolve and advance as a comprehensive decision- making framework. The program includes the planning, design, and construction of quality facilities as well as the optimized operation; maintenance; and planned refurbishment or replacement of assets to meet OC San’s needs. This coordinated decision-making process allows OC San to consistently meet mandated levels of service while balancing short, medium, and long-term needs at the lowest overall lifecycle cost. The ongoing improvement and maturation of the Asset Management Program has resulted in the annual publication of an Asset Management Plan which provides details on the program, asset condition summaries, and budgetary considerations. The plan evaluates the remaining useful life of assets by discipline within each of the major areas (Collection System, Reclamation Plant No. 1, and Reclamation Plant No. 2). The Asset Management Plan is not only useful for documenting the current condition of OC San’s assets, but it also helps to develop the 20-year CIP by identifying what projects are necessary, when they are needed, and how best to accomplish them. The overarching trend identied by the Asset Management Program is a focus on renewal expenditures which is expected given the average age of OC San’s assets. The value of OC San’s assets and the 20-year CIP plan to sustain them are summarized in the following sections and described in more detail in the CIP Budget Request Summary section of this report. Valuation Plants Collections Total Replacement $9.73 $5.93 $15.66 Value (in billions) Future CIP, Rehabilitation and Refurbishment Proposed CIP Outlay for Board Authorized Projects 20 2 5 - 2 6 20 2 6 - 2 7 20 2 7 - 2 8 20 2 8 - 2 9 20 2 9 - 3 0 20 3 0 - 3 1 20 3 1 - 3 2 20 3 2 - 3 3 20 3 3 - 3 4 20 3 4 - 3 5 20 3 5 - 3 6 20 3 6 - 3 7 20 3 7 - 3 8 20 3 8 - 3 9 20 3 9 - 4 0 20 4 0 - 4 1 20 4 1 - 4 2 20 4 2 - 4 3 20 4 3 - 4 4 20 4 4 - 4 5 0 100M 200M 300M 400M 500M 20 year CIP Outlay ($) BUDGET UPDATE - FISCAL YEAR 2025-26 10 for preventing sanitary sewer overows; however, these three pump stations are a priority for replacement with an average age of 58 years since original installation. These projects are projected to spend a combined $25 million in FY 2025-26. Additionally, as the system continues to age, associated condition issues are being addressed throughout the collection system. Project No. 1-23, Santa Ana Trunk Sewer Rehabilitation; Project No. 3-64C, Los Alamitos Sub-Trunk and Westside Relief Interceptor Rehabilitation; and 7-65, Gisler-Red Hill Interceptor and Baker Force Main Improvements, are three good examples of this ongoing rehabilitation eort. All three projects are in construction and are projected to spend a combined $26 million in FY 2025-26. Reclamation Plant No. 1 and Reclamation Plant No. 2 Maintenance The maintenance program is continually being optimized with a focus on predictive and preventative maintenance which identies and addresses issues early on. This approach not only allows for a more planned and less disruptive maintenance program but is also more cost eective. Each year the maintenance divisions complete tens of thousands of these predictive and preventative maintenance tasks. Reclamation Plant No. 1 Capital Projects These projects are intended to rehabilitate or reconstruct major components of our treatment process and support facilities to ensure reliable operations. One of the largest projects at Plant No. 1 continues to be the Headworks Rehabilitation at Plant No. 1 (Project No. P1-105). The facility is over 30 years old, and a comprehensive refurbishment is required to ensure the continued reliable operation of the facility into the future. The project will rehabilitate systems including the metering and diversion structure, the bar screen building, the bin loading building, the main sewage pump station, the grit basins, the primary inuent channels, the headworks odor control scrubbers, electrical power distribution systems, and control elements. This project is in construction and is projecting to spend $24 million in FY 2025-26, with nal completion scheduled in 2030. Another signicant project at Plant No. 1 is Project No. J- 133, the Laboratory Replacement at Plant No. 1, which will replace the existing onsite laboratory at Plant No. 1 with an osite facility located near the new Headquarters Building. This will provide a new facility which meets current codes and also make additional Maintenance and Capital Projects Below is a summary of the maintenance activities and associated capital projects for FY 2025-26. Collection System OC San’s collection system consists of over 380 miles of sewers and 15 pump stations. Maintenance activities are based on established levels of service to ensure compliance with OC San’s permit-required Sewer System Management Plan (SSMP). The SSPM is designed to both reduce spills and increase reliability and safety. Planned activities help extend the useful life of the assets and minimize nuisance odors. Typical gravity sewer maintenance consists of closed circuit television (CCTV) inspection and cleaning operations. Pump station maintenance activities include routine assessments; preventive and corrective maintenance of all electrical, mechanical, and instrumentation equipment; and cleaning activities. Frequencies are based on process conditions, eld data, historical records, manufacturer recommendations, and industry best practices. Collection systems generate odors and corrosive gases. These odors and gases are proactively addressed to mitigate nuisance odors and limit degradation of collection system assets. Collection System Capital Projects OC San’s collections projects go through a planning and design process to ensure all elements of the project are thoroughly assessed. These projects typically renew or replace aging pipelines and pump stations; address odor issues; upgrade facilities to meet current codes and standards; and, in some instances, increase ow capacity due to growth in localized portions of our service area. In FY 2025-26 a focus continues to be on the replacement of three of OC San’s important pump stations. Project Nos. 3-67 and 5-67 are both in construction and will replace Seal Beach Pump Station and Bay Bridge Pump Station, respectively. The construction at Seal Beach Pump Station is expected to be one of the greatest contributors to capital spending in the coming year. Project No. 11-33, Edinger Pump Station Replacement, is progressing through design and is expected to advertise for construction within the coming scal year. The reliability of all of OC San’s pump stations are critical ASSET MANAGEMENT BUDGET UPDATE - FISCAL YEAR 2025-26 11 land within the treatment plant footprint available for future process and construction needs. This is one of the rst projects planned for execution as a progressive design build project for OC San and is projected to spend $1 million in FY 2025-26. Major overhauls of aging infrastructure continue downstream of headworks with projects P1-126, Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1, and P1-140, Activated Sludge-1 and Secondary Clarier Rehabilitation. Both projects are expected to be nearing completion of design in the coming scal year and anticipate to spend $10 million in FY 2025-26. Reclamation Plant No. 2 Capital Projects These projects are intended to rehabilitate or reconstruct major components of our treatment process to ensure compliance with regulatory permits, enhance water recycling, and safety. One of the largest and longest duration active projects at Plant No. 2 remains Project P2-98 (Primary Treatment Rehabilitation at Plant No. 2). This project is in construction and will renew the useful life of the 14 primary clariers and associated support facilities at Plant No. 2 via rehabilitation and replacement. These facilities date back to the late 1950’s and need seismic and condition-based upgrades. The nal phase of this project is now under construction and is projecting to spend $23 million in FY 2025-26, with completion scheduled in 2027. ASSET MANAGEMENT BUDGET UPDATE - FISCAL YEAR 2025-26 12 CIP Budget Request Summary OC San utilizes an asset management focused approach to eectively manage $15.7 billion of aging assets which require ongoing investment and attention. This approach includes both the consistent evaluation of the condition of existing assets and the consideration of what future facilities will be needed to address changing regulations, demographics, and strategic initiatives. OC San also performs annual reviews of active and future projects through our Capital Improvement Program (CIP) validation process. The Project Management Oce manages the scope, schedule, budget, risks, and other key project indicators of active projects. Updates are recorded monthly so that individual project and programmatic information can be monitored. During validation, OC San sta review each ongoing capital improvement project to ensure that the scopes of the projects remain appropriate, that cost estimates are current, and that prioritization and schedule t within the program. For future projects, the Planning Division reviews how to best package and schedule those items identied via the Asset Management Program to facilitate their execution and maintain operational reliability. During validation, OC San sta carefully review all future projects to ensure timing needs are accurate and no further scope changes are required. The result of this asset management focused approach and validation process is an updated 20- year CIP budget each year. The following information summarizes the outcome of the 2025 budget validation process which results in the proposed update to the FY 2024-25 and FY 2025-26 two-year budget. The validated CIP includes 74 large capital projects with a total 10-year estimated cashow expenditure of $3.6 billion. This represents a net $119 million increase from the FY 2024-25 and FY 2025-26 CIP estimate. For a listing of capital projects and their budgets, see “Summary of Capital Requirements” in the appendix. The CIP also includes a variety of individually smaller programs that are grouped together within the CIP – Small Construction Projects, Planning Studies, Research, and Information Technology Capital. These eorts are consolidated under their own project budgets that are listed as M-FE, M-STUDIES, M- RESEARCH, and M-MC-IT respectively. CAPITAL IMPROVEMENT PROGRAM (CIP) Six new projects were created during the 2025 validation totaling $195 million. These projects are: As part of the budget update process, the following projects are closed or cancelled: Closed: Cancelled: P1-136 was cancelled as this project’s scope of work was able to be incorporated into a new project, J-142, which bundled similar work from various eorts into a single project. This decision will allow for the more ecient execution of these improvements. Within the appendix are descriptions and justications for the capital improvement projects which are new projects proposed for this FY 2025-26 budget update. They give the reader a brief overview of each project, the budget for the total project, and any potential changes in the operating budget resulting from the implementation of the project. For a description of ongoing projects, see Section 8 of the Adopted Budget for FY’s 2024-25 and 2025-26. J-140 – CenGen Monitoring System Improvements at Plant No. 1 and No. 2 J-141 – Public Address System Replacement J-142 – Power Distribution Systems and Power Building C Replacements at Plant No. 1 and No. 2 J-143 – Deep Well Biosolids Management Facility P2-142 – Oxygen Gas Generation Facility at Plant No. 2 P2-143 – Waste Sidestream Pump Station A Improvements at Plant No. 2 P2-122 – Headworks Modications at Plant No. 2 for GWRS Final Expansion P2-123 – Return Activated Sludge Piping Replacement at Plant 2 SP-100 – EAM Software and Process Implementation 7-66 – Sunower and Red Hill Interceptor Repairs J-127 – Natural Gas Pipelines Replacement at Plant Nos. 1 and 2 P1-136 – 12.47 kV Switchgear Replacement at Central Generation at Plant No. 1 BUDGET UPDATE - FISCAL YEAR 2025-26 13 Debt Coverage Ratios OC San has no legal debt limits as imposed by state legislation. The only legal debt limits pertaining to OC San are those that are provided within the existing COP indenture agreements requiring minimum coverage ratios of 1.25. The minimum coverage ratio is the ratio of net annual revenues available for debt service requirements to total annual debt service requirements for all senior lien COP debt. The coverage ratio for senior lien COP debt is proposed at 5.30 for FY 2025- 26. Debt Financing A Ten-Year Financial Plan is maintained to establish nancing parameters regarding the issuance of debt, the levying of user charges and the funding level for required reserves in accordance with OC San’s reserve policy. The Financial Plan is revised annually to reect the most current cost and revenue gures resulting from capital program revisions and operating changes. Certicates of Particiaption (COPs) The primary debt nancing mechanism used is Certicates of Participation (COPs). COPs are repayment obligations based on a lease or installment sale agreement. The COP structure was selected over other structures because COPs are not viewed as debt by the State of California, as the purchaser does not actually receive a "bond," but rather a share in an installment sale arrangement where OC San serves as the purchaser. Accordingly, OC San is not subject to the usual State restrictions surrounding the issuance of debt. COPs can be issued with xed or variable interest rates. As of July 1, 2025, the total outstanding COP indebtedness is $572.0 million. Dedicated Funding Source In 1992 and 2004 the Board of Directors formalized the dedication of certain funding sources. To assure the continuation of favorable credit ratings, revenues were dedicated to debt service in the following order: BUDGET UPDATE - FISCAL YEAR 2025-26 This apportionment of the ad valorem tax was consistent with and pursuant to the Revenue Program adopted in April 1979 to comply with regulations of the Environmental Protection Agency and the State Water Resources Control Board and in accordance with COP documents and Board policy. Ad valorem property taxes1. Sanitary sewer service charges2. Other Revenues 3. Build America Bonds Financing OC San issued the $80.0 million Wastewater Revenue Obligation, Series 2010A in May 2010 and the $157.0 million Wastewater Revenue Obligations, Series 2010C in December 2010 as “Build America Bonds” (BABs) xed rate debt. The American Recovery and Reinvestment Act of 2009 created a new nancing product, BABs, for the municipal issuer. BABs are issued as higher interest taxable bonds; however, the U.S. Treasury provides a 35 percent subsidy on interest payments. The net cost, after accounting for the 35 percent subsidy payment, frequently results in lower net costs to the issuer, specically in the maturity years beyond ten years. On March 1, 2013, the federal government implemented certain automatic spending cuts known as the sequester. As a result of the sequester, federal subsidy payments on BABs have been reduced annually from a high of 8.7 percent for the federal scal year ended September 30, 2013 to a low of 5.7 percent for the federal scal year ended September 30, 2030. In FY 2023-24, OC San prepaid approximately $130 million of the 2010C BABs debt obligation, reducing the total term of the debt portfolio, with nal payment date in 2040. Future Financings As a result of having a prudent reserve policy, experienced management and prudent planning, OC San has been able to secure “AAA” credit ratings from Fitch Ratings, Moody’s Investors Service and S&P Global Ratings. OC San’s long-range nancing plan is designed to maintain these high ratings. Over the next 10 years, OC San is projecting an additional $3.6 billion in future treatment plant and collection system capital replacement, refurbishment and rehabilitation improvements. In accordance with OC San’s long-term debt scal policy, OC San will conne long-term borrowing to capital improvements that cannot be nanced from current revenue. Before any new debt is issued, the impact of debt service payments on total annual xed costs will be analyzed. OC San’s cash ow forecast does not require any new money debt issuances over the next ten years as all capital improvements planned over this time period primarily consist of replacement, refurbishment and rehabilitation of existing projects which are to be funded through existing reserves and current sewer charges. DEBT FINANCING PROGRAM 14 $ ,,$ ,,$ ,,$ ,, ,,,,,,,, ,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, (,,)(,,)(,,)(,,) $ ,,$ ,,$ ,,$ ,, Salaries, Wages & Benets Administrative Expenses Printing & Publication Training & Meetings Operating Materials & Supplies Contractual Services Professional Services Research & Monitoring Repairs & Maintenance Utilities Other Materials, Supplies, and Svc Cost Allocation Net Operating Requirements Summary of Operating and Maintenance Expenses 2024-25 Adopted 2024-25 Projected 2025-26 Adopted 2025-26 ProposedDescription OPERATING EXPENSES Salaries & Wages: The proposed budget is set at 664.5 Full Time Equivalent (FTE) positions for FY 2025-26. An increase in salaries and wages is attributable to anticipated salary and benet adjustments for all employee bargaining units. Retirement: The employees of OC San are members of the Orange County Employees Retirement System. Employees participate in one of three plans depending on hire date: Plan H (older), Plan B, or Plan U (newer, with a lower retirement benet). The estimated employer’s required contribution rate, based on employees’ base salaries, has decreased for Plan H (191 employees) from 13.47 percent to 13.36 percent and Plan B (52 employees) from 13.09 percent to 12.81 percent, but increased for Plan U (365 employees) from 9.82 percent to 9.97 percent for FY 2025-26. The contribution rate for Plan H includes OC San’s pickup of 3.5 percent of employees’ required contributions. Salaries, Wages & Benets Group Insurance: This includes OC San’s share of employees’ medical and dental insurance plans, and life and disability insurance premiums. It also includes the other post-employment benets that OC San is obligated to pay for retirees. The group insurance budget approximates $17,658 per employee. Tuition & Certication Reimbursements: To encourage the self-development and training of employees, OC San has a tuition and certication reimbursement program. This appropriation is set at $86,076 for FY 2025-26. Development Pay: To further promote employee eorts that increase job knowledge, skills, and abilities, OC San has established this benet for employees obtaining educational degrees and job related certicates and licenses. The budget of $654,928 for FY 2025-26 is based on estimated employee participation. Uniforms: This budget projection is for uniforms provided to eld and lab employees in accordance with employee MOUs. BUDGET UPDATE - FISCAL YEAR 2025-26 15 $ 124,095,542 31,214,001 $ 232,674,493 $ 238,114,716 2,726,372 394,733 1,947,414 31,807,230 7,056,284 2,022,637 16,436,772 8,149,313 (22,355,980) Administrative Expenses These accounts include supplies, postage, technical journals and publications, forms, small oce equipment, and small computer items. The small equipment and computer items cost less than $15,000 per item and exclude items that are capitalized. Printing and Publication The budget provides for in-house and outside reproduction costs and reects an expanded management information system and administrative requirements as well as a continuing demand by the public and regulatory agencies for information. This group of accounts also includes costs for photo processing, advertisements, and notices. Training & Meetings This category includes ongoing technical and safety training and materials for sta, required training for computerized plant monitoring, and control systems training to allow for a more adaptive and exible workforce. OC San continues to place an emphasis on safety, technical, leadership, and management training. Operating Materials & Supplies Ferrous chloride, magnesium hydroxide, calcium nitrate, and caustic soda are the primary odor control chemicals used within the collection system and work by reducing the generation of hydrogen sulde in the trunklines. The chemical dosage and costs reect the established performance level and aects the use of chemicals at the treatment plants. The odor control budget is $10.5 million for FY 2025- 26; only $11,00 higher than the adopted budget for FY 2025-26. Chemical Coagulants: Chemical coagulants are used to enhance the primary treatment process by increasing the solids removal eciencies and dewatering and thickening solids for disposal, and are used to control hydrogen sulde levels in the digester gas. The costs for these chemicals are expected to increase slightly due to increasing costs, usage is expected to remain stable over the next budget year. The budgeted amount for FY 2025-26 is $16.5 million, an increase of 0.8 percent over the FY 2025-26 adopted budget. Odor Control Chemicals: OC San uses sodium hydroxide (caustic soda), and bleach as the primary odor control chemicals within the treatment plants’ foul air scrubbers. In addition, muriatic acid is an odor control chemical used for cleaning the scrubbers. Contractual Services The major component of this category is biosolids removal and transportation costs. Contracts have been executed with rms for agricultural reuse of residual solids and composting for biosolids disposal. The total costs budgeted for solids removal is $14.2 million for FY 2025-26. Solids have been dried above original targets due to the success of the centrifuges over the belt presses, increased costs in fuel and disposal contracts have been oset by the savings from reduced tonnage being hauled away. This category also includes appropriations for other waste removal, janitorial, groundskeeping and security services, county service fees, temporary employment services to level out periodic increases in sta workload, long-term leaves, and position vacancies, outside laboratory services, manhole rehabilitation, and industrial line and outfall inspection and cleaning services. Professional Services This group of accounts includes General Counsel, special labor counsel, engineering, advocacy eorts, audit and accounting services, software program consulting, and other technical consulting services. Research and Monitoring The costs in this category consist of contract services to carry out the extensive ocean monitoring program required by EPA Region IX under the provisions of OC San’s NPDES permit, air quality monitoring costs, OC San’s contribution to the Southern California Coastal Water Research Project (SCCWRP) being conducted. OPERATING EXPENSES BUDGET UPDATE - FISCAL YEAR 2025-26 16 Under a joint powers agreement with other Southern California municipal dischargers, operating costs for OC San’s ocean monitoring vessel, and provides for operational and ocean research and evaluation to develop optimum operating parameters in the treatment plants. Overall, this category of costs is expected to increase slightly from the need to outsource taxonomy and mooring services, resulting in FY 2025-26 budget of $2.17 million. Repairs and Maintenance The majority of the materials and services budgets support the maintenance of the collection system and the treatment plants. This includes street overlays and manhole raising, manhole cover purchases, surveying services, easement improvements, equipment maintenance, and outsourced service contracts and maintenance agreements. The FY 2025-26 budget includes repairs and maintenance costs totaling $37.6 million. Materials and services for FY 2025-26 include siphon cleaning, manhole rehab and replacement services, digester cleaning, and materials and services to maintain OC San’s eet. Service agreements for FY 2025-26 include Information Technology maintenance, support, and licenses and disaster recovery and cybersecurity hardware and software, Operations & Maintenance service contracts for crane certication, engine monitoring systems, door and gate maintenance, scale, re extinguisher, and re sprinkler certication, uninterruptible power supply electrical maintenance, scaolding, and tree trimming. Utilities The cost for utilities is a signicant component of the operating budget. The overall cost for utilities is anticipated to be $17.0 million for FY 2025-26. Natural Gas: Natural gas is purchased to supplement the digester gas that is used to run the central generation facilities. The total natural gas budget is $3.3 million for FY 2025-26. Electricity: Electricity is the largest utility cost incurred by OC San. Purchased electricity is used to run the plant processes, support buildings, and pump stations. OC San procures electricity under the Southern California Edison (SCE) Direct Access program from third party supplier, and SCE is paid only for delivering the electricity. This arrangement has allowed OC San to secure a xed rate for the power and should result in savings long term. The estimated consumption and resulting costs for electrical energy purchased for the plant processes and support buildings is $10.8 million for FY 2025-26, excluding contingencies and electricity requirements of all outlying pump stations. This estimate includes normal operations of CenGen and assumes $400,000 in savings due to battery utilization at Plant No. 1. The total budgeted amount for purchased electricity is $11.8 million for FY 2025-26. Insurance Premiums: Other than the budget of $53,000 for FY 2025-26 in the operating section to insure OC San’s ocean vessel, the cost for general liability and property insurance premiums is budgeted entirely within the Self-Insurance section. Property & General Liability In-Lieu Insurance Premium: This item is used to maintain the level of accumulated reserves for property and general liability self-insurance. The recommended budget is $5.3 million for FY 2025-26. The total estimated expenditures for the insurance program are set forth in detail in the Self-Insurance section. Other Operating & Non-Operating Expenses: Expenses not chargeable elsewhere, such as annual regulatory fees assessed by SCAQMD and SWRCB, freight, obsolete inventory write-o, and other miscellaneous items are recorded within these groups of accounts. Other Operating Costs Cost Allocation This represents direct labor and benet charge-outs and materials, supplies, and services cost allocation to the capital projects where the related work is performed. Net Operating Requirements This line item represents the net salary, wages, benets, materials, supplies, and services related to operating costs for collection, treatment, and disposal activities after charge-backs to CIP. OPERATING EXPENSES BUDGET UPDATE - FISCAL YEAR 2025-26 17 $ ,,$ ,,$ ,, ,,,,,, ,,,,,, ,,,,,, ,,,,,, ,,,,,, ,,,,,, (,,)(,,)(,,) $ ,,$ ,,$ ,, General Manager Administrative Services Communications Human Resources Environmental Services Engineering Operations & Maintenance Less: Cost Allocation Net Operating Requirements 43,040,720 $ 2,391,105 ... ... ... ... ... ... ... ... General Manger's Oce Administrative Services Communications Human Resources Environmental Services Engineering Operations and Maintenance Grand Total - All Departments Department Proposed FTEs 2025-26 BUDGET UPDATE - FISCAL YEAR 2025-26 18 DEPARTMENTS SUMMARY Authorized FTEs 2025-26 Stang by Department Department Proposed 2025-26 Authorized 2024-25 Authorized 2025-26 Expenses by Department (in millions) Authorized FTEs 2024-25 41,306,827 3,609,570 8,145,456 25,645,097 27,731,816 145,205,640 $ 232,674,493 3,615,469 $ 2,507,271 8,371,095 26,230,669 28,664,926 148,040,546 (22,355,980) $ 238,114,716 54,903,456 142,481,529 4,007,556 $ 246,365,399 Administration Units General Manager’s Oce Budget $2,7M Stang 4 FTEs The General Manager’s Oce provides general oversight of all OC San operations and incorporates functions in the areas of Public Aairs and Board Services. Administrative Services Budget $54.9M Stang 132 FTEs The Administrative Services Department maintains nancial oversight and administration of all OC San funds and accounts and is responsible for contract administration and procurement. The Administrative Services Department also oversees all OC San computer, networking and customer support issues, along with facilities maintenance and eet services. Communications Budget $4.0M Stang 16 FTEs The Communications Department is designed to streamline communication and enhance transparency between government entities, the public, and our employees. We specialize in meeting management, public records, and crafting clear and engaging messages that convey important information, policies, and initiatives to our stakeholders. Our team works diligently to ensure that our agency actions are understood and accessible, fostering trust and accountability within both our internal and external communities. Human Resources Budget $8.7M Stang 28 FTEs The Human Resources Department works with management and employees to ensure an eective and productive employment relationship. The department also provides risk management services to the organization to create a safe, healthy and secure environment for sta, contractors, and visitors. Operating Units Environmental Services Budget $26.6M Stang 95.5 FTEs The Environmental Services Department manages all environmental monitoring, regulatory, compliance and reporting elements to ensure that OC San meets the requirements of federal, state and local regulations for treated sewage discharge into the ocean, water recycling, air emissions, industrial waste, sewer system operations, land use controls and biosolids and stormwater management. Engineering Budget $29.3M Stang 124 FTEs The Engineering Department is responsible for the planning and execution of OC San’s capital improvement program and asset management program. Operations and Maintenance Budget $142.5M Stang 265 FTEs The Operations and Maintenance Department is responsible for the operation and maintenance of OC San’s two wastewater treatment plants as well as the sanitary sewer system pipeline and pumping facilities. The department also provides eet management services for OC San. FTEs = Full-Time Equivalent Positions BUDGET UPDATE - FISCAL YEAR 2025-26 19 DEPARTMENTS SUMMARY Service Description The General Manager reports directly to the Board of Directors and provides general oversight to all OC San operations, interagency relations, legislative activities, communications, and the strategic planning. General Management Administration is responsible for working with the Board of Directors to establish standards, policies and procedures, and the overall goals and Strategic Plan of the agency. GENERAL MANAGER BUDGET UPDATE - FISCAL YEAR 2025-26 20 Personnel $ ,,$ ,,$ ,,$ ,, Supplies ,,,, Professional & Contractual Services ,,,, Research & Monitoring ---- Repairs & Maintenance ---- Utilities ---- Other , Total $ ,,$ ,,$ ,,$ ,, FY25-26 Authorized FTE Positions Executive Managers Supervisors / Professionals Condential Total Stang Trends 333 444 444 444 444 2021-22 2022-23 2023-24 2024-25 2025-26 2 4 Budget Overview The FY 2025-26 propsed budget for the General Manager’s Oce reects an increase of 7.3 percent over the FY 2025-26 adopted budget. The increase is primarily due to increases in costs for personnel, and other professional services. Performance Objectives / Measures Ensure that the Board approved Strategic Plan is implemented. Create a new Work Plan for Fiscal Years (FY) 2024-25 and 2025-26. Update Two-Year Strategic Plan & Recommend for Board Adoption in FY 2025-26. Managing operating expenditures to within 96 to 100 percent of the approved budget. Ensure OC San does not exceed authorized FTEs. GENERAL MANAGER 2024-25 Adopted 2024-25 Projected 2025-26 Adopted 2025-26 ProposedDescription BUDGET UPDATE - FISCAL YEAR 2025-26 21 $ 1,672,880 $ 2,391,105 $ 1,759,496 $ 2,507,271 $ 1,673,353 $ 1,787,759 Service Description The Administrative Services Department oversees all of OC San’s nance, contracts/purchasing, information technology, facilities maintenance, and eet services activities, including both day-to-day operations and strategic planning. The department serves as a liaison to Executive Management, the Board of Directors, and other departments of OC San. The department includes seven divisions: Administrative Services provides leadership and oversight to all Administrative Services divisions. Consolidated Services accounts for various OC San expenses that are not attributed to one division. Financial Management oversees and administers all OC San’s funds and accounts. Programs include treasury and debt management, accounts receivable and payable, user fees, payroll, nancial reporting, xed assets accounting, project controls, and coordinating the capital and operating budget process. Contracts, Purchasing, and Materials Management is responsible for contract administration and procurement for all departments. Additionally, this division manages OC San’s warehouse, receives and maintains inventory, and distributes supplies, materials, and equipment. Information Technology is responsible for customer support related information technology assets and services, networking and infrastructure, telecommunications service operation and maintenance, databases and programming, solutions and application support, and cyber security. Facilities Maintenance is responsible for management and maintenance the OC San facilities. This includes support for the treatment plants, collection systems, laboratory, and headquarters buildings. Additionally, the division addresses real estate matters such as easements, acquisitions, legal issues, property condition assessments, and overall property management. Fleet Services provides vehicles and equipment to serve the logistics and mobility needs of all OC San sta. The division ensures vehicles and equipment are reliably maintained and readily available and provides crane services and tour bus operation. ADMINISTRATIVE SERVICES BUDGET UPDATE - FISCAL YEAR 2025-26 22 Personnel $ ,,$ ,,$ ,,$ ,, Supplies ,,,,,,,, Professional & Contractual Services ,,,,,,,, Research & Monitoring ---- Repairs & Maintenance ,,,,,,,, Utilities ,,,,,,,, Other ,,,,,,,, Total $ ,,$ ,,$ ,,$ ,, FY25-26 Authorized FTE Positions Executive Managers Managers Supervisors / Professionals Operations & Maintenance Administrative & Clerical Technical Services Total Sta ng Trends 102102102 103103103 109109109 109109109 2021-22 2022-23 2023-24 2024-25 2025-26 100 120 140 Budget Overview The FY 2025-26 proposed budget for the Administrative Services Department reects a 27.6 percent increase from the FY 2025-26 adopted budget. The increase is primarily due to an increase in FTE’s,personnel costs,small computer items, minor furniture and xtures, training and meetings, tools, legal services,other professional services, and service maintenance agreements, due to the transfer fo the facilities maintenance and eet services functions being transferred to this department. Performance Objectives / Measures Manage operating expenditures to within 96 to 100 percent of the approved budget. Comply with the California State Government Code 100 percent of the time with all treasury investments. Submit the annual sewer service fee property parcel database to the County in time for placement on annual secured property tax bills. Continue the cycle count program and maintain a 97 percent accuracy rate or better. Replace obsolete desktop,mobile,server computers, and network infrastructure for OC San’s oce computing. Cyber Security Awareness Protection – report on the overall eectiveness of phishing campaign. Maintain a Work Order backlog of less than 5 weeks. ADMINISTRATIVE SERVICES 2024-25 Adopted 2024-25 Projected 2025-26 Adopted 2025-26 ProposedDescription BUDGET UPDATE - FISCAL YEAR 2025-26 23 75 132 132 $ 21,047,228 2,601,091 6,847,200 3,993,700 1,672,800 5,144,808 $ 22,123,181 $ 41,306,827 $ 43,040,720 3,209,740 6,656,275 3,833,620 1,704,200 5,513,702 $ 25,965,154 Service Description Communications Administration is designed to streamline communication and enhance transparency between government entities, the public, and our employees. We specialize in meeting management, public records, and crafting clear and engaging messages that convey important information, policies, and initiatives to our stakeholders. Our team works diligently to ensure that our agency actions are understood and accessible, fostering trust and accountability within both our internal and external communities. Communications Administration oversees the Board Services and Public Aairs Divisions. Board Services provides a high level of customer service through the Clerk of the Board’s oce. The Clerk of the Board’s oce promotes public trust and ensures transparency by: accurately recording and preserving the legislative actions of OC San; safeguarding the vital, historic and permanent records of OC San as their ocial custodian; preparing and publishing agendas and notices in accordance with legal requirements; receiving and responding to requests for records, acts as ling ocer for Statement of Economic Interest lings; receiving and processing summons, subpoenas and complaints led against OC San; and maintaining rosters of the Board of Directors, appointed committees and historical events. Public Aairs provides services and implements programs to meet the communications and legislative needs of both internal and external audiences for the OC San. The division plans and implements media relations, website content, community relations, community education and outreach, employee newsletter, intranet development, corporate identity program, collateral material and graphics development, presentation development, crisis communications and legislative aairs. The goal is to create a comprehensive communications program that promotes clear and transparent communications with all identied audiences and to promote the understanding of OC San’s mission to protect public health and the environment. COMMUNICATIONS BUDGET UPDATE - FISCAL YEAR 2025-26 24 Personnel $ ,,$ ,,$ ,,$ ,, Supplies ,,,, Professional & Contractual Services ,,,, Research & Monitoring ---- Repairs & Maintenance ---- Utilities ---- Other ,,,, Total $ ,,$ ,,$ ,,$ ,, FY25-26 Authorized FTE Positions Executive Managers Supervisors / Professionals Administrative & Clerical Condential Total Stang Trends 121212 121212 161616 161616 161616 2021-22 2022-23 2023-24 2024-25 2025-26 10 12 14 16 18 Budget Overview The FY 2025-26 proposed budget for Communications reects an increase of 10.8 percent over the FY 2025-26 adopted budget. The increase is primarily due to increases in professional services. Performance Objectives / Measures Maintain the Special District Leadership Foundation (SDLF) District Transparency Certicate of Excellence. Ensure that the Board approved Strategic Plan is implemented. Managing operating expenditures to within 96 to 100 percent of the approved budget. Respond to 95 percent of public records requests within seven business days. Provide services and implement programs that meet the communications needs of OC San’s internal audiences by producing a minimum of 500 internal communication pieces. Provide services and implement programs that meet communication needs of OC San’s external audience by reaching a minimum of 25,000 people. 2024-25 Adopted 2024-25 Projected 2025-26 Adopted 2025-26 ProposedDescription BUDGET UPDATE - FISCAL YEAR 2025-26 COMMUNICATIONS 25 $ 2,572,960 $ 2,700,234 169,595 $ 3,609,570 $ 3,615,469 Service Description Human Resources is a full-service centralized department responsible for Human Resources and Risk Management programs and services. These include managing OC San’s human capital, developing and administering programs that are legally compliant and ensuring a productive and safe workplace that attracts and retains top talent, and contributes to operational eciency and a resilient workforce. The Human Resources Department is committed to a workplace grounded in fair and equitable employment decisions and safe work practices. This department serves as a strategic partner and advisor to the General Manager, executive sta, OC San departments, and all sta by delivering high quality services. Human Resources serves as a strategic partner to departments on employment matters and organizational programs. The division ensures compliance with labor and employment laws and develops programs and services designed to attract, develop, motivate, and retain a high performing workforce that meet the needs of the organization. The team provides highly responsive services and expert consultation in key areas, including workforce planning, recruitment and selection, classication and compensation, benets, training and development, employee and labor relations, leave administration, performance management and employee engagement strategies. Additionally, the division is responsible for developing and implementing organizational policies and procedures ensuring alignment with legal requirements and evolving business needs. Risk Management is dedicated to protecting the wellbeing of employees through robust safety and health programs. The division proactively identies and mitigates potential hazards, ensures compliance with regulations, delivers safety training, conducts incident investigations, facility inspections and industrial hygiene assessments, oversees construction contractors and develops and implements injury and illness prevention strategies. These measures eectively reduce workplace accidents and injuries, enhance productivity and eciency and contribute to employee retention and job satisfaction. The team also manages emergency preparedness and response eorts, including developing and leading emergency exercises and minimizing organizational disruptions in the event of a disaster. Additionally, the division is responsible for physical security contract oversight, controlled access, and critical infrastructure surveillance. These eorts are crucial to safeguard assets, operations and employees and ensure business continuity and a safe and secure workplace. HUMAN RESOURCES BUDGET UPDATE - FISCAL YEAR 2025-26 26 Personnel $ ,,$ ,,$ ,,$ ,, Supplies ,,,, Professional & Contractual Services ,,,,,,,, Research & Monitoring ---- Repairs & Maintenance ,,,, Utilities ---- Other ,,,, Total $ ,,$ ,,$ ,,$ ,, FY25-26 Authorized FTE Positions Executive Managers Managers Supervisors / Professionals Administrative & Clerical Condential Total Stang Trends 262626 262626 282828 282828 282828 2021-22 2022-23 2023-24 2024-25 2025-26 25 26 27 28 29 Budget Overview The FY 2025-26 proposed budget for the Human Resources Department reects a 3.7 percent increase from the FY 2025-26 adopted budget. The increase is primarily due to the addition of supplies. Performance Objectives / Measures Work with upper management to resolve issues at the lowest level through focused training and conict resolution techniques. Complete labor negotiations with all bargaining units. Full implementation of a centralized training program and employee development plans. Meet the training level of service of 40-45 hours per employee. Ensure 100% completion of safety training and contractor safety orientations. Ongoing evaluation of safety and health programs through third party safety audits, periodic inspections, and key performance indicators. Ongoing implementation of physical security plans on new designs and renovation projects. Develop and conduct routine emergency response exercises and facilitate emergency response training. 2024-25 Adopted 2024-25 Projected 2025-26 Adopted 2025-26 ProposedDescription BUDGET UPDATE - FISCAL YEAR 2025-26 HUMAN RESOURCES 27 $ 5,659.162 511,137 $ 8,371,095 $ 5,400,575 Service Description The Environmental Services Department manages OC San’s environmental monitoring, laboratory services, environmental compliance, pretreatment enforcement, and compliance reporting elements to ensure that OC San meets the requirements of federal, state, and local regulations for ocean discharge, water recycling, air emissions, industrial waste, dry weather urban runo diversion, biosolids, and on-site stormwater management. The Environmental Services Department consists of four divisions: Environmental Services Administration provides leadership, support, and management oversight for the Department to accomplish OC San’s Strategic Plan and departmental annual goals. Resource Protection provides regional enforcement of federal pretreatment regulations and ensures continuous improvement in OC San’s enhanced source control program to sustain water recycling and benecial biosolids reuse. The division conducts its source control activities in a cost eective and legally defensible manner to protect OC San’s facilities, employees, public health, and the environment. Environmental Laboratory and Ocean Monitoring provides sampling, wastewater treatment process monitoring, ocean operations, laboratory analysis, and environmental research services to support OC San’s operations and to protect receiving water quality. The division is responsible for collaborating with OC San’s coastal monitoring partners and advancing analytical innovation in key regulatory areas such as compounds of emerging concern and toxic air contaminants. Environmental Compliance The Regulatory Compliance group is tasked with ensuring adherence to environmental regulations and permit conditions for ocean discharge, air emissions, stormwater discharge, sanitary sewer overows, and biosolids/solids management. The team actively advocates for responsible and pragmatic environmental regulations relevant to wastewater treatment and resource recovery. ENVIRONMENTAL SERVICES BUDGET UPDATE - FISCAL YEAR 2025-26 28 Personnel $ ,,$ ,,$ ,,$ ,, Supplies ,,,,,,,, Professional & Contractual Services ,,,,,,,, Research & Monitoring ,,,,,,,, Repairs & Maintenance ,,,, Utilities ---- Other ,,,,,,,, Total $ ,,$ ,,$ ,,$ ,, FY25-26 Authorized FTE Positions . . Executive Managers Managers Supervisors / Professionals Administrative & Clerical Technical Services Total Stang Trends 939393 939393 979797 97.597.597.5 95.595.595.5 2021-22 2022-23 2023-24 2024-25 2025-26 92 94 96 98 Budget Overview The FY 2025-26 proposed budget for the Environmental Services Department reects an increase of 1.5 percent from the FY 2025-26 adopted budget. The increase is primarily due to legal services, engineering services, environmental scientic consulting, and regulatory operating fees. Performance Objectives / Measures Manage operating expenditures to within 96 to 100 percent of the approved budget. Ensure that reporting divisions achieve no less than 90 percent of individual performance objectives. Ensure that all environmental compliance reporting requirements are met on or before required submission dates. Conduct audits of all major environmental permits at least once every three years. Complete 100 percent of Safety Scorecard requirements each quarter. 2024-25 Adopted 2024-25 Projected 2025-26 Adopted 2025-26 ProposedDescription BUDGET UPDATE - FISCAL YEAR 2025-26 ENVIRONMENTAL SERVICES 29 $ 25,655,097 $ 17,708,278 $ 26,230,669 $ 18,547,269 1,133,670 2,022,637 558,000 $ 16,663,109 Service Description The Engineering Department is responsible for the planning and execution of OC San’s Capital Improvement Program, the Asset Management Program, and interagency coordination. The Engineering Department is comprised of ve divisions: Engineering Administration provides management to all Engineering Divisions. Planning is responsible for developing and maintaining a comprehensive Capital Improvement Program for OC San considering projected capacity requirements, condition of assets, anticipated regulatory and level of service changes, and technological opportunities. Planning is responsible for OC San’s Asset Management program to ensure that required levels of service are met by performing planned repair, rehabilitation, and replacement of facilities at optimal lifecycle costs. In addition, this division is responsible for California Environmental Quality Act preparation and review, and performs services for annexations, connection permitting, and interagency agreements. Project Managementis responsible for the timely delivery of planning studies and capital and facilities repair projects. Design provides technical leadership, engineering design and quality assurance, design standards development and management, control systems design and programming, and commissioning oversight. Construction Management provides construction engineering, quality control inspection, commissioning execution, and other technical support for construction projects. ENGINEERING BUDGET UPDATE - FISCAL YEAR 2025-26 30 Personnel $ ,,$ ,,$ ,,$ ,, Supplies ,,,, Professional & Contractual Services ,,,,,,,, Research & Monitoring ---- Repairs & Maintenance (,), Utilities ---- Other ,,,, Total $ ,,$ ,,$ ,,$ ,, FY25-26 Authorized FTE Positions Executive Managers Managers Supervisors / Professionals Administrative & Clerical Total Stang Trends 116116116 123123123 124124124 124124124 124124124 2021-22 2022-23 2023-24 2024-25 2025-26 115 120 125 Budget Overview The FY 2025-26 proposed budget for the Engineering Department reects a 2.4 percent increase from the FY 2025-26 adopted budget. The increase is primarily due to an increase in personnel costs, training and meetings, and software programing consulting. Performance Objectives / Measures Expend 90 to 105 percent of project annual Capital Improvement Program cash ows. Manage operating expenditures to within 90 to 100 percent of the approved budget. Ensure that reporting divisions achieve 90 percent of individual performance objectives. Prepare and maintain a 20-year Capital Improvement Program coordinating condition assessment, regulatory requirements, changing levels of service, and projected capacity requirements. 2024-25 Adopted 2024-25 Projected 2025-26 Adopted 2025-26 ProposedDescription BUDGET UPDATE - FISCAL YEAR 2025-26 ENGINEERING 31 $ 25,784,434 $ 27,731,816 $ 26,933,129 221,137 $ 28,664,926 Service Description The Operations and Maintenance (O&M) Department is responsible for treating wastewater, reusing or disposing of the treated wastewater and all residuals, providing maintenance support to all treatment facilities, operating and maintaining the sanitary sewer system pipeline and pumping facilities, and for providing eet management services. The Department consists of seven divisions: Operations and Maintenance Administration provides leadership and oversight to all O&M divisions. Collection Facilities Operations and Maintenance operates and maintains the regional facilities which include gravity sewers, pumping facilities, and the Regional Odor and Corrosion Control System (ROCCS). Coordinates with Resource Protection to ensure compliance with all regulatory permits. Collections Maintenance also includes planning for all maintenance activities as well as reliability engineering for both Plants and the Collections System. Plant No. 1 and Plant No. 2 Operations are responsible for the daily management of the wastewater treatment processes, sludge and biosolids treatment and loading processes, odor and air quality control processes, and digester gas transmission. Activities also include ensuring compliance with all Federal and State regulatory permits, support of the Capital Improvement Program, Asset Management, and coordination of construction and maintenance work. Plant No. 1 and Plant No. 2 Operations also ensures the delivery of specication water to the Groundwater Replenishment System for recycling. Plant No. 1 and Plant No. 2 Maintenance are responsible for civil, electrical, facilities, instrumentation, and mechanical maintenance of the two treatment plants and pump stations facilities. Operates and maintains Central Generation facilities OPERATIONS AND MAINTENANCE BUDGET UPDATE - FISCAL YEAR 2025-26 32 Personnel $ ,,$ ,,$ ,,$ ,, Supplies ,,,,,,,, Professional & Contractual Services ,,,,,,,, Research & Monitoring ---- Repairs & Maintenance ,,,,,,,, Utilities ,,,,,,,, Other ,,,, Total $ ,,$ ,,$ ,,$ ,, FY25-26 Authorized FTE Positions Executive Managers Managers Supervisors / Professionals Operations & Maintenance Administrative & Clerical Total Stang Trends 287287287 286286286 286286286 287287287 266266266 2021-22 2022-23 2023-24 2024-25 2025-26 260 280 300 Budget Overview The FY 2025-26 proposed budget for the Operations and Maintenance Department reects a 3.8 percent decrease from the FY 2025-26 adopted budget. The decrease is primarily due to the transfer of facilties maintenance and eet services to the Administrative Services depaertment. Performance Objectives / Measures Achieve zero enforceable compliance actions for water, solids, and air requirements. Achieve 100 percent compliance level of 90 to 100 percent of the Levels of Service targets. Manage operating expenditures to within 96 to 100 percent of the approved budget. 2024-25 Adopted 2024-25 Projected 2025-26 Adopted 2025-26 ProposedDescription BUDGET UPDATE - FISCAL YEAR 2025-26 OPERATIONS AND MAINTENANCE 33 265 $ 49,951,644 $ 52,398,949 31,042,805 17,797,290 31,777,949 14,458,574 177,378 $ 148,040,546$ 145,205,640 18,345,791 31,143,395 $ 45,309,070 15,203,572 31,420,981 $ 49,392,922 132,407 $ 142,787,529 APPENDIX BUDGET UPDATE - FISCAL YEAR 2025-26 Orange County Sanitation District ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,, ,,,,,,,,,,,, ------ ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, (,,)(,,)(,,)(,,)(,,)(,,) -,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,(,,)(,,)(,,)(,,) ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, $ $ $ $ $ $ .%.%.%.%.%.% ,,,,,, $ ,$ ,$ ,$ ,$ ,$ , $ ,,$ ,,$ ,,$ ,,$ ,,$ ,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,, ------ ,,,,,,,,,,,, ...... Revenues: General User Fees Permitted User Fees IRWD Assessments SAWPA Assessments Property Taxes New COP Issues Interest Revenues Capital Facilities Capacity Charges Other Revenues Revenues Requirements: Oper & Mtce Exp Capital Improvement Program (CIP) Less: CIP Savings & Deferrals Allocation for Future Rehabilitation COP Debt Service Reduction of Long-Term Liabilities Other Requirements Requirements Revenues-Requirements: Accumulated Funds: Beginning of Year End of Year Consolidated Reserve Policy: Over (Under) Reserve Policy: Sewer Service User Fees: Avg SFR Annual User Fee Percentage Change Equivalent Dwelling Units SFR Connection Fee Outstanding COPs Reserve Policy: 50% Next Year Operating Expense 10% Next Year Operating Expense 100% Next Year AUG COP Svc. 50% Average Ten-Year CIP Balance Debt Svc @ 10% Outstanding COP Self Funded Insurance @ $100M Repl & Refurb *Reserve Reduction Total COP Ratios: Sr Lien Coverage, Min 1.25 Ref Description Consolidated Cash Flow Projections Prelim. 30-31Prelim. 25-26 Prelim. 26-27 Prelim. 27-28 Prelim. 28-29 Prelim. 29-30 BUDGET UPDATE - FISCAL YEAR 2025-26 A-1 CASH FLOW PROJECTION Orange County Sanitation District ,,,,,,,,,,, ,,,,,,,,,, ,,,,,,,,,, ,,,,,, ,,,,,,,,,,, ----- ,,,,,,,,,, ,,,,,,,,,, ,,,,,,,,,, ,,,,,,,,,,, ,,,,,,,,,,, ,,,,,,,,,,, (,,)(,,)(,,)(,,)(,,) ,,,,,,,,,, ,,,,,,,,,, ,,,,,,,,,, ,,,,,,,,,, ,,,,,,,,,,, (,,),,,,,,(,,) ,,,,,,,,,,, ,,,,,,,,,,, ,,,,,,,,,,, (,,)(,,),,,,,, $ $ $ $ .%.%.%.% ,,,, $ ,$ ,$ ,$ , $ ,,$ ,,$ ,,$ ,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, ---- ,,,,,,,, .... Revenues: General User Fees Permitted User Fees IRWD Assessments SAWPA Assessments Property Taxes New COP Issues Interest Revenues Capital Facilities Capacity Charges Other Revenues Revenues Requirements: Oper & Mtce Exp Capital Improvement Program (CIP) Less: CIP Savings & Deferrals Allocation for Future Rehabilitation COP Debt Service Reduction of Long-Term Liabilities Other Requirements Requirements Revenues-Requirements: Accumulated Funds: Beginning of Year End of Year Consolidated Reserve Policy: Over (Under) Reserve Policy: Sewer Service User Fees: Avg SFR Annual User Fee Percentage Change Equivalent Dwelling Units SFR Connection Fee Outstanding COPs Reserve Policy: 50% Next Year Operating Expense 10% Next Year Operating Expense 100% Next Year AUG COP Svc. 50% Average Ten-Year CIP Balance Debt Svc @ 10% Outstanding COP Self Funded Insurance @ $100M Repl & Refurb *Reserve Reduction Total COP Ratios: Sr Lien Coverage, Min 1.25 Ref Description Consolidated Cash Flow Projections Prelim. 34-35Prelim. 31-32 Prelim. 32-33 Prelim. 33-34 10 - Year Total BUDGET UPDATE - FISCAL YEAR 2025-26 A-2 CASH FLOW PROJECTION $ ,,$ ,$ ,,$ ,$ ,, ,,,,,-,, ,,,,,,,,,, ,,,,--,, ,,---,, ,,,--,, ,,,,--,, ,,---,, ,,,,--,, ,,,--,, ,,,,,,,,,, -,,--,, ,,,,,,,, -,--, ----- ,,,,,,,,,, ,,,,,,,,,, ----- ----- ----$ ,, Collections Facilities Solids Handling & Digestion Support Facilities Utility Systems Liquid Treatment: Headworks Primary Treatment Ocean Outfall Systems Secondary Treatment Liquid Treatment Subtotal Other: Information Management Systems Equipment Research Strategic & Master Planning Others Water Management Projects Other Subtotal Grand Total Less: CIP Savings & Deferrals Allocation for Future Rehab. Proposed Net CIP Outlay Project Summary FY 2025-26 Item Rehabilitation and Replacement Strategic Initiatives Additional Capacity Regulatory Total Budget Authority BUDGET UPDATE - FISCAL YEAR 2025-26 A-3 PROJECT SUMMARY (34,674,086) $ 254,276,633 FY 2025-26 Capital Improvement Program Outlay by Process -$289.0 Million Net CIP Outlay - $254.3 Million FY 2025-26 Capital Improvement Program Outlay by Driver - $289.0 Million Net CIP Outlay - $254.3 Million SolidsSolids: 17.9 (6.2%): 17.9 (6.2%)Solids: 17.9 (6.2%) Support FacilitiesSupport Facilities: 40.7 (14.1%): 40.7 (14.1%)Support Facilities: 40.7 (14.1%) Utility SystemsUtility Systems: 23.3 (8.1%): 23.3 (8.1%)Utility Systems: 23.3 (8.1%) Collection FacilitiesCollection Facilities: 62.5 (21.6%): 62.5 (21.6%)Collection Facilities: 62.5 (21.6%)Liquid TreatmentLiquid Treatment: 70.8 (24.5%): 70.8 (24.5%)Liquid Treatment: 70.8 (24.5%) OtherOther: 73.8 (25.6%): 73.8 (25.6%)Other: 73.8 (25.6%) Rehab and ReplaceRehab and Replace: 204.8 (70.9%): 204.8 (70.9%)Rehab and Replace: 204.8 (70.9%) RegulatoryRegulatory: 18.8 (6.5%): 18.8 (6.5%)Regulatory: 18.8 (6.5%) Additional CapacityAdditional Capacity: 28.2 (9.8%): 28.2 (9.8%)Additional Capacity: 28.2 (9.8%) Strategic InitiativesStrategic Initiatives: 37.2 (12.9%): 37.2 (12.9%)Strategic Initiatives: 37.2 (12.9%) BUDGET UPDATE - FISCAL YEAR 2025-26 A-4 SUMMARY OF CAPITAL REQUIREMENTS (70.8%) (25.5%) Edinger Pump Station Repl.-$ ,,$ ,,$ ,, Slater Pump Station Rehab.-,,-,, North Huntington Beach Sewer Rehab.-,,-,, Santa Ana Trunk Sewer Rehab.-,,,,,, Greenville Trunk Impr.-,,- Taft Branch Impr.-,,,,,, Fullerton - Placentia Sewer Facilities Demo. & Rehab.-,,,,, Atwood - Santa Ana Canyon Sewer Rehab.-,,-,, Knott - Miller Holder Artesia Branch Rehab.-,,,,, Westminster Blvd Force Main Repl.-,,-- Rehab. of Western Regional Sewers -,,,,,, I- Widening Project Impacts on OCSD Sewers -,,, Seal Beach Pump Station Repl.-,,,,,, Seal Beach Sewer Facilities Impr.-,,-,, Crystal Cove Pump Station Rehab.-,,-,, Bay Bridge Pump Station Repl.-,,,,,, Newport Beach Pump Station Pressurization Impr.-,,,- East Coast Highway Sewer Rehab.-,,,,, Fairview Sewer Rehab.-,,,,, MacArthur Pump Station Rehab.-,,,,, Main Street Pump Station Rehab.-,,-,, Gisler-Red Hill Interceptor & Baker Force Main Rehab.-,,,,,, MacArthur Force Main Impr.-,,,, North Tustin-Orange Sewer Rehab.-,,,,, Collections Facilities Total $ ,,,$ ,,$ ,, Summary of Capital Requirement - Collection System Improvement Projects Collections Facilities Future Outlay Total Project Budget Project Number Proposed 2025-26 Outlay BUDGET UPDATE - FISCAL YEAR 2025-26 A-5 SUMMARY OF CAPITAL REQUIREMENTS Headworks Rehab. at PP-,,,,,, Headworks Total ,,,,,, Ocean Outfall System Rehab.J-,,,,,, Ocean Outfalls Rehab.J-,,,,,, Chemical Systems Rehab. at PP-,,,,, Emergency Overow Pipes & Wingwalls Rehab. at PP-,,,,, Ocean Outfall Systems Total ,,,,,, Deep Well Biosolids Mgmt. Facility J-,,,,, Interim Food Waste Receiving Facility P-,,,,, Digester Repl. at PP-,,,,,, Digesters Rehab. at PP-,,,,,, Truck Loading Bay Odor Control Impr. at PP-,,,,, Solids Handling & Digestion Total ,,,,,, Activated Sludge- Rehab. at PP-,,,,,, Trickling Filter Media Repl. at PP-,,,,,, Activated Sludge Aeration Basin Rehab. at PP-,,,,,, Secondary Treatment Total ,,,,,, Primary Sed. Basins No. - Repl. at PP-,,,,,, Primary Sed. Basins No. - Reliability Impr. at PP-,,,, B/C-Side Primary Sed. Basins Rehab. at PP-,,-,, Primary Treatment Rehab. at PP-,,,,,, Primary Treatment Total ,,,,,, Equipment Purchases Equipment ,,-- Equipment Total ,,-- Summary of Capital Requirement - Treatment System Improvement Projects Equipment Headworks Primary Treatment Secondary Treatment Solids Handling & Digestion Ocean Outfall System BUDGET UPDATE - FISCAL YEAR 2025-26 A-6 SUMMARY OF CAPITAL REQUIREMENTS Future Outlay Total Project Budget Project Number Proposed 2025-26 Outlay Research Program M-RESEARCH ,,,,,, Research Total ,,,,,, GWRS Final Expansion Coordination J--,,-- Water Management Projects Total ,,-- Planning Studies Program M-STUDIES ,,,,,, Strategic & Master Planning Total ,,,,,, Process Control Systems Upgrades J-,,,,,, Project Mgmt. Information System J-,,,, Process Control System Alarm Optimization J-,,,,, Information Technology Capital Program M-MC-IT ,,,,,, Information Management Systems Total ,,,,,, Digester Gas Facilities Rehab.J-,,,,,, Cen Gen Engine Overhauls at P & J-,,,,,, J- CenGen & Support Buildings Seismic Impr. at P & …J-,,,,, Public Address System Repl.J-,,,,, Power Distribution Systems & Power Building C Repl.s at P…J-,,,,, Electrical Power Distribution System Impr.J-,,,,,, Uninterruptable Power Supply Impr. at PP-,,,,,, Industrial Control System & IT Data Center Relocation at PP-,,,,, Headworks Electrical Distribution Impr. at PP-,,,,, Utility Systems Total ,,,,,, Summary of Capital Requirement - Treatment System Improvement Projects Utility Systems Information Management Systems Strategic & Master Planning Water Management Projects Research BUDGET UPDATE - FISCAL YEAR 2025-26 A-7 SUMMARY OF CAPITAL REQUIREMENTS Future Outlay Total Project Budget Project Number Proposed 2025-26 Outlay Laboratory Repl. at PJ-,,,,,, CenGen Monitoring System Impr. at P & No.J-,,,,, Small Construction Projects Program M-FE ,,,,,, Headquarters Complex P-,,,- South Perimeter Security & Utility Impr. at PP-,,-- Support Buildings Seismic Impr. at PP-,,,,,, Administrative Facilities Demo.P-,,,,, Collections Yard Relocation & Warehouse Demo. at PP-,,,, Operations & Maintenance Complex at P.P-,,,,,, Oxygen Gas Generation Facility at PP-,,,,, Waste Sidestream Pump Station A Impr. at PP-,,,,, Support Facilities Total ,,,,,, Capital Improvement Program Mgmt. Services SP-,,,, Others Total ,,,, Summary of Capital Requirement - Treatment System Improvement Projects Support Facilities Others Total Treatment and Disposal Projects ,,,,,,,, Total Collections Facilities ,,,,,,, Capital Equipment Purchases ,,-- Total Capital Improvement Program Budget $ ,,,$ ,,$ ,,, Less: CIP Savings & Deferrals -(,,)- Proposed Net CIP Outlay -$ ,,- BUDGET UPDATE - FISCAL YEAR 2025-26 A-8 SUMMARY OF CAPITAL REQUIREMENTS Future Outlay Total Project Budget Project Number Proposed 2025-26 Outlay 59,148,516 $288,950,719 $254,276,633 Description This project will replace the obsolete Central Generation engine and generator vibration monitoring systems at Plant Nos. 1 & No. 2 with new condition monitoring systems; incorporate new vibration sensors for all engines, generators, and turbochargers; install new pressure sensors on the engine cylinders; and provide additional instrumentation to monitor auxiliary systems. Project Category CenGen Monitoring System Impr. at P1 & No.2 - J-140 Support Facilities New Justication The existing vibration monitoring systems are obsolete and need to be replaced. The engine peak ring pressures are currently measured manually using a portable analyzer. The new monitoring systems with additional instrumentation on the engines, generators, and auxiliary systems will help provide early warning of adverse conditions and will enable live data monitoring to support operational and maintenance decision-making to ensure safe, reliable operation. Budget Projections Proj Dev -------- Prelim Design -------- Design --,,,--,, Construction ----,,,,,,, Commissioning -------- Close-out -------- Contingency ------,,,, Total --$ ,$ ,$ ,$ ,,$ ,,$ ,, Budget Phase Cost to Date 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 Thereafter Total Project Budget Project Name & Number Project Status: The project's estimated construction contract cost is $,,. Financial Consideration BUDGET UPDATE - FISCAL YEAR 2025-26 A-9 CIP PROJECT DETAIL SHEETS Description This project will install a new public address system at both reclamation plants and the seven coastal pump stations in Newport Beach. The new system will be an ethernet/IP based system and will integrate into OC San’s other alert systems such as re and mass messaging. Project Category Public Address System Repl. - J-141 Utility Systems New Justication The current public address system is both nearing the end of its useful life and doesn’t provide the full desired coverage of OC San’s facilities. Repairing the existing system is becoming increasingly dicult with some parts becoming obsolete. A functional public address system is critical to maintaining safety at the reclamation plants and critical pump stations during emergencies. Budget Projections Proj Dev -------- Prelim Design -------- Design --,,,,-,, Construction -----,,,,, Commissioning -------- Close-out -------- Contingency ------,,,, Total --$ ,$ ,$ ,$ ,$ ,,$ ,, Budget Phase Cost to Date 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 Thereafter Total Project Budget Project Name & Number Project Status: The project's estimated construction contract cost is $,,. Financial Consideration BUDGET UPDATE - FISCAL YEAR 2025-26 A-10 CIP PROJECT DETAIL SHEETS Description This project will replace the Central Generation and Service Center medium voltage switchgear, motor control centers and other power distribution equipment along with cabling infrastructure at Plant No. 1. This project will also construct a new Power Building C and demolish the existing power building at Plant No. 2. The new power building will include all new electrical equipment including transformers, switchgear, motor control centers, generators, distribution panelboards and battery system. Project Category Power Distribution Systems & Power Building C Repl.s at P1 & No. 2 - J-142 Utility Systems New Justication The electrical equipment and cabling infrastructure inside the Central Generation Facility and Service Center is approaching the end of useful life requiring replacement. The existing Power Building C electrical equipment is also approaching end of useful life. A new Power Building C will ensure long term electrical reliability for Digesters P, Q, R and S while simplifying construction sequencing and replacement of these digesters in the future. Budget Projections Proj Dev -------- Prelim Design -------- Design --,,,,,,,-,, Construction -----,,,,,, Commissioning -------- Close-out -------- Contingency ------,,,, Total --$ ,$ ,,$ ,,$ ,,$ ,,$ ,, Budget Phase Cost to Date 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 Thereafter Total Project Budget Project Name & Number Project Status: The project's estimated construction contract cost is $,,. This project will not have an impact on operational budgets. The increased budget is a result of changes in the project elements identied from recent engineering eorts. Financial Consideration BUDGET UPDATE - FISCAL YEAR 2025-26 A-11 CIP PROJECT DETAIL SHEETS Description This project will construct a deep well injection facility at Plant No. 1 for the storage and disposal of biosolids into porous underground geological formations. The facility will handle biosolids from Reclamation Plant No. 1 and No. 2. The major process equipment will include a receiving facility for hauled biosolids, biosolids screening facility, injection pumps, injection wells, ush water facility, and an electrical building. Project Category Deep Well Biosolids Mgmt. Facility - J-143 Solids Handling & Digestion New Justication Currently OC San produces approximately 550 wet tons per day of Class B dewatered biosolids. The dewatered biosolids are trucked to Arizona and various composting facilities within California. The hauling cost budget for 2025 is approximately $14,000,000. Potential future regulations could limit OC San’s ability to benecially reuse biosolids for land application and options for disposal of biosolids are not guaranteed. Deep well injection of biosolids will provide a reliable, long-term disposal option for biosolids and yield signicant operational savings related to the dewatering and hauling of biosolids. Budget Projections Proj Dev -------- Prelim Design -------- Design --,,,,,,,,,, Construction ------,,,, Commissioning -------- Close-out -------- Contingency ------,,,, Total --$ ,$ ,,$ ,,$ ,,$ ,,$ ,, Budget Phase Cost to Date 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 Thereafter Total Project Budget Project Name & Number Project Status: The project's estimated construction contract cost is $,,. Financial Consideration BUDGET UPDATE - FISCAL YEAR 2025-26 A-12 CIP PROJECT DETAIL SHEETS Description This project will install an oxygen generation facility for the secondary treatment process at Reclamation Plant No. 2. This facility will serve as the primary source for the oxygen and the existing liquid oxygen storage and supply system will provide reliable back-up and peaking service. The generation facility will include sound attenuation to mitigate equipment noise. Project Category Oxygen Gas Generation Facility at P2 - P2-142 Support Facilities New Justication OC San currently purchases liquid oxygen to supply oxygen needed for secondary treatment at Reclamation Plant No. 2. Onsite oxygen generation will increase the reliability of oxygen supply, mitigate future liquid oxygen supply risks, and provides long-term savings when compared to the purchase of LOX Budget Projections Proj Dev -------- Prelim Design -------- Design --,,,,,,, Construction ------,,,, Commissioning -------- Close-out -------- Contingency ------,,,, Total --$ ,$ ,$ ,$ ,$ ,,$ ,, Budget Phase Cost to Date 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 Thereafter Total Project Budget Project Name & Number Project Status: The project's estimated construction contract cost is $,,. Financial Consideration BUDGET UPDATE - FISCAL YEAR 2025-26 A-13 CIP PROJECT DETAIL SHEETS Description This project will replace the Waste Sidestream Pump Station A (WSSPS-A) pumps; repair the wet well concrete; repair the pump pit surrounding tunnels; replace associated electrical equipment; replace portions of the piping, valves and, ventilation equipment; and install a new 10-inch discharge from WSSPS-A to the new A-side Primary Clarier Complex being constructed by Project P2-98A. Project Category Waste Sidestream Pump Station A Impr. at P2 - P2-143 Support Facilities New Justication The WSSPS-A is located in a recessed area within Tremblay Tunnel that is subject to ooding. New pumps are required to mitigate associated risks to assuring long-term operation and reliability. Structural rehabilitation and equipment replacement is required due to age and associated conditions. Routing the WSSPS-A discharge to the A- side Primary Clarier complex will prevent recirculation of scum which is currently causing process challenges resulting in additional maintenance eorts. Budget Projections Proj Dev -------- Prelim Design -------- Design --,,,,-,, Construction -----,,,,,, Commissioning -------- Close-out -------- Contingency ------,,,, Total --$ ,$ ,$ ,$ ,,$ ,,$ ,, Budget Phase Cost to Date 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 Thereafter Total Project Budget Project Name & Number Project Status: The project's estimated construction contract cost is $,,. This project will not have an impact on operational budgets. This project is being converted from Project No. X- to Project P- Financial Consideration BUDGET UPDATE - FISCAL YEAR 2025-26 A-14 CIP PROJECT DETAIL SHEETS Proposed Capital Equipment Budget FY 2025-26 Division Trucks & Vehicles 09410000 Other Mobile Eq 09410001 Machine Eq & Tools 09410002 Comm Equipment 09410003 General Management Admin ---- Financial Management ---- Contracts, Purch, & Materials Mgmt ---- Information Technology ---- Fleet Services ,,,,- Resource Protection ---- Environmental Laboratory and Ocean Monitoring ---- Design ---- Collection Facilities O&M --,- Maintenance Support Services --,- Plant No. Operations ---- Plant No. Maintenance --,,- Plant No. Maintenance --,,- Total Proposed Capital Equipment ,,,,,- Continued to next page CAPITAL EQUIPMENT BUDGET SUMMARY BUDGET UPDATE - FISCAL YEAR 2025-26 A-15 Proposed Capital Equipment Budget FY 2025-26 Division Instr & Test Equipment 09410004 Safety & Trac Eq 09410005 Oce Fix & Eq 09410006 2025-26 Proposed Budget Computer Equipment 09410007 General Management Admin --,,-,, Financial Management ---,, Contracts, Purch, & Materials Mgmt ---,, Information Technology ---,,,, Fleet Services ---,,, Resource Protection ,--,, Environmental Laboratory and Ocean Monitoring ,,,--,, Design ---,, Collection Facilities O&M ----, Maintenance Support Services ,---, Plant No. Operations ,---, Plant No. Maintenance ----,, Plant No. Maintenance ,,--,, Total Proposed Capital Equipment ,,,,,,,,,, Continued from previous page CAPITAL EQUIPMENT BUDGET SUMMARY BUDGET UPDATE - FISCAL YEAR 2025-26 A-16 - General Management Admin Property Purchase ,, Total ,, - Financial Management Customer Portal , Total , - Contracts, Purch, & Materials Mgmt OpenGov Procurement Software , Total , - Information Technology Automated Records Retention , - Information Technology SBITA renewals ,, - Information Technology Network TAPS for ICS and Oce , - Information Technology Zero Trust Network Access , - Information Technology Outdoor wireless AP Replacement , - Information Technology O Cloud Backup , - Information Technology CCTV Husky Server , - Information Technology Self-Password Reset Solution , Total ,, - Fleet Services Portable Pump, Trailer Mounted, -inch, AQMD/CARB Approved , - Fleet Services Portable Pump, Trailer Mounted, -inch, AQMD/CARB Approved , - Fleet Services Electric Cart (O&M), - Fleet Services Generator, kW, Skid Mounted, AQMD/CARB Approved , - Fleet Services KEY MANAGEMENT SYSTEM , - Fleet Services SELF-LEVELING SCISSOR LIFT , - Fleet Services PERSONAL DRIVEABLE MAST LIFT , - Fleet Services FLEET CUSTOM EQUIPMENT - PULL RIG , - Fleet Services HEAVY DUTY VEHICLES - ROLLOVER , - Fleet Services NARROW ARTICULATING BOOM LIFT , Total ,, - Resource Protection Tablets for eld data entry, photone evidence , - Resource Protection HACH Autosamplers , Total , - Environmental Laboratory and Ocean Monitoring Oil and Grease Extractor , - Environmental Laboratory and Ocean Monitoring Liquid Chromatograph/Tandem Mass Spectrometer (LC-MS/MS), - Environmental Laboratory and Ocean Monitoring Ocean Monitoring Program Research Vessel ,, - Environmental Laboratory and Ocean Monitoring Benchtop Fume Hood , - Environmental Laboratory and Ocean Monitoring Sulfur Chemiluminescence Detector (SCD), - Environmental Laboratory and Ocean Monitoring HACH Autosampler , Total ,, Division Equipment Type Proposed Equipment Budget CAPITAL EQUIPMENT BUDGET DETAIL BUDGET UPDATE - FISCAL YEAR 2025-26 A-17 - Design ABB Commissioning Systems , Total , - Collection Facilities O&M Emergency Capital Critical Spares for plant and collections …, Total , - Maintenance Support Services ROTALIGN TOUCH WITH COMPLETE BRACKET KITS , - Maintenance Support Services Faro Vantage S Max Tracker , - Maintenance Support Services SDT Ultrasound , - Maintenance Support Services Alta Solutions Channel Analyzer , - Maintenance Support Services Schenk HMBU/CAB Balancing Machine , - Maintenance Support Services Ercolina Angle and Pipe Roller , - Maintenance Support Services Burr King Vibratory Tumbler , - Maintenance Support Services RDI Data Acquisition Unit , Total , - Plant No. Operations Jerome , Total , - Plant No. Maintenance Oil Lubrication Work Center , - Plant No. Maintenance Emergency Capital Critical Spares for plant and collections …,, - Plant No. Maintenance Sunower Gear Box and Rotating Parts , - Plant No. Maintenance Cooper LSVB Intake Manifolds , Total ,, - Plant No. Maintenance Emergency Capital Critical Spares for plant and collections …,, - Plant No. Maintenance Trickling Filter Critical Spare Parts , - Plant No. Maintenance Additional Bar Screen Work Platform , - Plant No. Maintenance Portable External Flowmeter System , - Plant No. Maintenance Portable Network Cable Testing/Analyzer Kit , - Plant No. Maintenance Calibration Work Station , - Plant No. Maintenance Cooper LSVB Intake Manifolds , Total ,, Division Equipment Type CAPITAL EQUIPMENT BUDGET DETAIL Proposed Equipment Budget BUDGET UPDATE - FISCAL YEAR 2025-26 A-18 Total Proposed Budget $ ,, Within 1 hour in plants Within 24-hours in collection system ENVIRONMENTAL STEWARDSHIP Levels of Service Target OC San will protect public health and the environment. Compliance with Ocean Discharge Permit 100% Up to 10 MGDDry weather urban runo collected and treated Major non-conformance audit ndings < 5 Per permit per audit Respond to corrective actions within regulatory timeline for air, solids, and water compliance audits 100% Comply with Fleet Air Emission Regulations 100% Number of odor complaints under normal operations < 5 per events per treatment plant < 12 per events for collection system Sanitary Sewer Spills per 100 miles < 2.1 Compliance with core industrial pretreatment requirements 100% OC San’s euent, solids and biogas will be recycled. Provide specication euent to Groundwater Replenishment System 100% Benecially reuse biosolids during normal operations 100% WASTEWATER MANAGEMENT OC San will be a good neighbor and will be responsive to its customers. Respond to odor complaints Respond to collection system spills within 1 hour of notication 100% Respond to public complaints or inquiries regarding construction within 24 hours 100% Respond to biosolids contractor violations within one week of violation notice 100% Respond to Public Records Act requests within the statutory requirements < = 10 days Dig alert response within 48 hours 100% FY 2023-24 Results 100% 2.81 MGD 0 100% 100% 11 events for both plants combined 10 events for collection system 0 100% 100% 100% 100% Within 1 hour in plants Within 24-hours in collection system 100% 100% 100% 100% LEVELS OF SERVICE BUDGET UPDATE - FISCAL YEAR 2025-26 A-19 WORKPLACE ENVIRONMENT BUSINESS PRINCIPLES OC San will manage its assets to ensure reliability and security. < 2.5 LEVELS OF SERVICE Levels of Service Target > 87%Cybersecurity event monitoring and incident handling, percent successful Annual real property assessments/inspections 25% of the properties Annual inspection, documentation, and evaluation of collection system 70 miles of sewers 880 manholes OC San will exercise sound nancial management. Annual user fees sucient to cover 100% of O&M Budget 100% Collection, treatment, and disposal costs per million gallons Maintain Credit Rating (Moody’s, Fitch, S&P)AAA OC San will provide a safe, productive workplace. Employee injury incident rate per 100 employees Annual days away from work, restricted activity, or job transfer resulting from a work-related injury < 4.4 Annual training hours per employee 45 hours FY 2023-24 Results 95% 0% 38.4 miles of sewer 373 manholes 100% AAA 2.6 2.85 days 100% Within 10% of BudgetWithin 6% of Budget BUDGET UPDATE - FISCAL YEAR 2025-26 A-20 SELF-FUNDED INSURANCE PLANS Self-Funded Insurance Plans OC San is partially self-insured for general liability and workers' compensation. The General Liability and Property program and the Workers' Compensation program have been in existence since 1979. The annual in-lieu premiums and charges to the Revenue Areas or Operating Divisions are the revenue sources within these programs. Expenses primarily consist of claim settlements, legal fees, and excess loss insurance premiums. Ending Reserve Balances are projected at $100,000,000. General Liability and Property OC San's current excess workers' compensation coverage has unlimited statutory coverage per occurrence and $4 million employer's liability with a self-insured retention of $1 million per person per occurrence. In order to maintain the reserve balance of $2 million for the Workers' Compensation program, appropriations for in-lieu premiums charged to operating divisions are recommended $791,455 for FY 2025-26. OC San's current outside excess general liability insurance coverage is $40 million per occurrence with an annual aggregate limit and with a self-insured retention of $750,000. OC San's current property insurance coverage is $1 billion for perils of re and $25 million for perils of ood, subject to a self-insured retention of $1 million. OC San is partially self-insured for earthquake but does carry $25 million in coverage on 15 key structures with a $5 million deductible. OC San also has a $50 million sublimit for builder's risk under the property insurance program to ensure upcoming construction projects are adequately covered. In order to maintain a reserve balance of $98 million for the Property and General Liability program, appropriations for in-lieu premiums charged to the operating divisions are recommended at $4.6 million for FY 2025-26. Workers' Compensation 30110 - General Liability Self- Insurance 9112 - Workers Compensation Self- Insurance 400 - Revenue Department Beginning Reserves $ ,,$ ,,$ ,, DESCRIPTION OR ACCOUNT TITLE ,,,,, ,,,, ,,, ,,,,,, Revenues In-Lieu Premiums Reserve Contribution Service Department Allocation Total Revenues ,,,, -,, ,,, ,,,, ,,,,, ,,,,,, Expenses Benets/Claims Legal Services Professional Services Subtotal Policy Premium Expense Total Expenses ---Excess Revenue (Expenses) $ ,,$ ,,$ ,,Ending Reserves BUDGET UPDATE - FISCAL YEAR 2025-26 A-21 Total Self-Insurance Fund ..... ..... ..... ..... ..... ..... ..... ... ..... ..... ..... ... ..... ..... ..... ..... ..... ..... ... ..... ..... ..... ..... ..... ..... ..... ..... ..... .... ..... ..... ..... ..... ..... ..... General Manager's Oce Header General Manager Administration General Manger's Oce Administrative Services Department Administrative Services Administration Financial Management Contracts, Purchasing and Materials Management Information Technology Facilities Maintenance Fleet Services Administrative Services Communications Department Communications Administration Board Services Public Aairs Communications Human Resources Department Human Resources Administration Human Resource Risk Management/Safety/Security Human Resources Environmental Services Department Environmental Services Administration Resource Protection Environmental Laboratory and Ocean Monitoring Environmental Compliance Environmental Services Engineering Department Engineering Administration Planning Project Management Oce Design Construction Management Engineering Operations and Maintenance Department Operations and Maintenance Administration Collection Facilities Operations and Maintenance Maintenance Support Services Fleet Services (old) Plant No. 1 Operations Plant No. 2 Operations Plant No. 1 Maintenance Plant No. 2 Maintenance Operations and Maintenance Grand Total - All Departments Department and Division Name Authorized FTEs 24-25 Proposed FTEs 25-26 Authorized FTEs 25-26 Authorized FTEs 23-24 Authorized FTEs 22-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-22 STAFFING ALLOCATION 285.00 37.00 97.50 663.50 56.00 0 ..... ..... ..--- -.... ..... ..... ..... .---- -.... --..- --..- --... ..--- ..... .---- -.... ..... .---- ..... ..... ..... ..... ..... ..... -.... .---- --... ..... General Manager Assistant General Manager Administration Manager Principal Sta Analyst Secretary to the General Manager 110 - General Management Admin 100 - General Manager Assistant General Manager Director of Finance Maintenance Manager Principal Sta Analyst Senior Accountant Administrative Assistant 210 - Administrative Services Admin Controller Finance & Procurement Manager Accounting Supervisor Principal Project Controls Analyst Principal Accountant Principal Sta Analyst Senior Accountant Senior Sta Analyst Accountant Payroll Technician Accounting Technician Accounting Assistant II Administrative Assistant 220 - Financial Management Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-23 HISTORICAL STAFFING DETAIL .-... ..... ..... -.... ..... ..... .---- ..... ..... .---- ..... -.... .---- .---- -.... .---- -.... .---- -.... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... .---- -.... ..... Purchasing & Contracts Manager Contracts Supervisor Purchasing Supervisor Materials Mgmt Supervisor Principal Contracts Administrator Senior Contracts Administrator Principal Buyer Contracts Administrator Senior Buyer Senior Sta Analyst Buyer Contract/Purchasing Technician Contracts/Purchasing Assistant Lead Storekeeper Lead Materials Management Clerk Senior Storekeeper Materials Management Clerk Storekeeper Materials Management Technician Oce Assistant 230 - Contracts, Purch, & Materials Mgmt Information Technology Manager Information Technology Supervisor Principal Information Technology Analyst Senior Information Technology Analyst Information Technology Analyst III Information Technology Analyst II Data Management Technician II Data Management Technician I Sta Analyst Administrative Assistant Information Technology Technician II Information Technology Technician 250 - Information Technology Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-24 HISTORICAL STAFFING DETAIL Authorized FTEs 2025-26 ----. ----. ----. ----. ----. ----. ----. ----. ----. ----. ----. ----. ----. ----. ----. ..... --.-- ---.. --... ..... ..... .---- -.... ..... ..... ..... -.... ..... ..... ..... ..... ..... ..... ..... Facilities Worker Maintenance Specialist Principal Sta Analyst Electrical Tech II Building Maintenance Tech Lead Elec Tech Maintenance Manager Lead Facilities Worker Maintenance Supervisor 260 - Facilities Maintenance Maintenance Supervisor Lead Mechanic Automotive/ Heavy Equipment Technician Mobile Crane Operator 261 - Fleet Services 200 - Administrative Services Administration Manager Director of Communications 310 - Communications Administration Clerk of the Board Assistant Clerk of the Board Data Management Technician I Records Management Technician Program Assistant Oce Assistant 320 - Board Services Public Aairs Supervisor Principal Public Aairs Specialist Senior Public Aairs Specialist Public Aairs Specialist Graphics Designer Administrative Assistant 340 - Public Aairs 300 - Communications Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-25 HISTORICAL STAFFING DETAIL Authorized FTEs 2025-26 --... --... ..--- .---- -.... ..... ..... ..... ..... -.... .---- -.... ..... -.... .---- -.... ..... .---- -.... ..--- --... ..--- --... .---- -.... .---- ..... ..... Director of Human Resources 510 - Human Resources Administration Director of Human Resources Human Resources and Risk Manager Human Resources Manager Human Resources Supervisor Principal Human Resources Analyst Senior Human Resources Analyst Human Resources Analyst Human Resources Technician II Human Resources Assistant Human Resources Technician I 520 - Human Resources Safety and Health Manager Safety & Health Supervisor Principal Safety & Health Specialist Security & Emergency Planning Specialist Senior Construction Inspector Safety Inspector Senior Safety & Health Representative Sr. Safety and Health Spclst Safety & Health Specialist Safety and Health Specialist Safety & Health Representative Human Resources Technician II Administrative Assistant 530 - Risk Management 500 - Human Resources Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-26 HISTORICAL STAFFING DETAIL Authorized FTEs 2025-26 ..... -.--- .---- ..--- ..--- ..--- ..--- .---- -.... ..... ..... ..... ..... ..... ..... ..... -.... ..... ..... ..... ..... ..... ...-- ..... ..... ....- ..... Director of Environmental Services Environmental Protection Manager Environmental Supervisor Senior Regulatory Specialist Regulatory Specialist Principal Environmental Specialist Senior Environmental Specialist Executive Assistant Administrative Assistant 610 - Environmental Services Administration Environmental Protection Manager Engineering Supervisor Environmental Supervisor Senior Engineer Engineer Associate Engineer Senior Regulatory Specialist Principal Environmental Specialist Lead Source Control Inspector Senior Environmental Specialist Source Control Inspector II Source Control Inspector I Administrative Assistant Environmental Technician Program Assistant Oce Assistant 620 - Resource Protection Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-27 HISTORICAL STAFFING DETAIL 3.00 37.00 Authorized FTEs 2025-26 -.... .---- ..... ..... ..... ..... ..... ..... ..... -.... ..... ..... ..... --... --... --... --... --... --... ..... ..... ..... .---- .---- ..... ..... ..... ..... ..... ..... .-... ..--- -.... ..... Environmental Protection Manager Environmental Lab & Ocean Monitoring Manager Environmental Supervisor Senior Scientist Scientist Principal Environmental Specialist Senior Environmental Specialist Environmental Specialist Boat Captain Assistant Boat Captain Administrative Assistant Environmental Technician 630 - Environmental Laboratory and Ocean Monito… Environ Protection Manager Pr Environmental Specialist Senior Regulatory Specialist Sr Environmental Specialist Regulatory Specialist 650 - Environmental Compliance 600 - Environmental Services Director of Engineering Principal Sta Analyst Sta Analyst Administrative Assistant 710 - Engineering Admin Engineering Manager Engineering Supervisor Senior Engineer Engineer Principal Sta Analyst Associate Engineer Engineering Associate Assistant Engineer 740 - Planning Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-28 HISTORICAL STAFFING DETAIL Authorized FTEs 2025-26 ..... ..... ..... ..... ..... ..... ....- ..... ..... ..... ..... -.... ..... ..... ..... ..... ..... ..... ..... -.... ..... -.... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... -.... ..... ..... .---- -.... ..... ..... ..... Engineering Manager Engineering Supervisor CIP Project Manager Senior Engineer Engineer Associate Engineer Engineering Associate Administrative Assistant 750 - Project Management Engineering Manager Engineering Supervisor Information Technology Supervisor Senior Engineer Principal Information Technology Analyst Engineer Senior Information Technology Analyst Associate Engineer Information Technology Analyst III Information Technology Analyst II Sta Analyst Administrative Assistant Assistant Engineer 760 - Design Engineering Manager Engineering Supervisor Construction Inspection Supervisor Senior Engineer Engineer Senior Cost Estimator Senior Planner/Scheduler Associate Engineer Planner/Scheduler Cost Estimator Senior Construction Inspector Construction Inspector Engineering Assistant II Engineering Technician Administrative Assistant 770 - Construction Management 700 - Engineering Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-29 HISTORICAL STAFFING DETAIL Authorized FTEs 2025-26 ..... .---- ..... ..... ..... .---- .---- .---- .---- ..... ..... ..... ..... ---.. ..... ..... -.... ...-- ..... ----. ----. ----. ----. ----. ----. ----. ----. ----. ----. ....- ....- ....- ....- ....- ....- Director of Operations & Maintenance Senior Sta Analyst 810 - O & M Administration Maintenance Manager Maintenance Supervisor Engineering Supervisor Principal Sta Analyst Associate Engineer Maintenance Specialist Principal Environmental Specialist Senior Environmental Specialist Lead Mechanic Senior Mechanic Environmental Specialist Administrative Assistant Mechanic Maintenance Worker Environmental Technician 820 - Collection Facilities O&M Senior Mechanic Reliability Maintenance Technician Maintenance Specialist Welder/Fabricator Lead Electrical Technician Associate Engineer Machinist Maintenance Supervisor Lead Mechanic 821 - Maintenance Support Services Maintenance Supervisor Lead Mechanic Automotive/ Heavy Equipment Technician Mobile Crane Operator Program Assistant 822 - Fleet Services Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-30 HISTORICAL STAFFING DETAIL Authorized FTEs 2025-26 ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... --... ..... ..... ..... ..... ..... ..... ..... ..... Operations Manager Chief Plant Operator Operations Supervisor Senior Engineer Engineer Associate Engineer Lead Plant Operator Senior Plant Operator Sta Analyst Administrative Assistant Plant Operator Program Assistant 830 - Plant No. 1 Operations Chief Plant Operator Operations Supervisor Lead Plant Operator Senior Plant Operator Administrative Assistant Plant Operator 840 - Plant No. 2 Operations Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-31 HISTORICAL STAFFING DETAIL Authorized FTEs 2025-26 ..... ..... ..... .---- ....- ..... ..... ..... ..... ..... ..... ..... ..... ..... ....- -.... ..... ..... ....- ..... .---- ..--- .---- .---- -...- ..... ..... Maintenance Manager Maintenance Superintendent Maintenance Supervisor Engineer Associate Engineer Maintenance Specialist Lead Instrumentation Technician Lead Electrical Technician Lead Power Plant Operator Reliability Maintenance Technician Instrumentation Technician II Electrical Technician II Lead Mechanic Power Plant Operator II Machinist Senior Sta Analyst Administrative Assistant Senior Mechanic Welder/Fabricator Lead Facilities Worker Instrumentation Technician I Electrical Technician I Facilities Worker/Painter Facilities Worker/Builder Facilities Worker Mechanic 870 - Plant No. 1 Maintenance Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-32 HISTORICAL STAFFING DETAIL Authorized FTEs 2025-26 ..... ..... ..... ..... ..... ..... ..... ..... ..... ....- ...-- ...-- .---- .---- -...- ..... -.--- ..... ..... ..... Maintenance Superintendent Maintenance Supervisor Lead Instrumentation Technician Lead Electrical Technician Instrumentation Technician II Electrical Technician II Lead Mechanic Senior Mechanic Administrative Assistant Lead Facilities Worker Instrumentation Technician I Electrical Technician I Facilities Worker/Painter Facilities Worker/Builder Facilities Worker Mechanic Maintenance Worker 880 - Plant No. 2 Maintenance 800 - Operations & Maintenance Orange County Sanitation District Division & Position Authorized FTEs 2024-25 Proposed FTEs 2025-26 Authorized FTEs 2023-24 Authorized FTEs 2022-23 BUDGET UPDATE - FISCAL YEAR 2025-26 A-33 HISTORICAL STAFFING DETAIL 9.00 3.00 9.00 9.00 15.0015.00 3.00 1.001.00 3.00 56.00 285.00 663.50 Authorized FTEs 2025-26 Article XIIIB of the California State Constitution, more commonly referred to as the Gann Initiative or Gann Limit, was approved by California voters in 1979. The Gann Limit placed limits on the amount of proceeds of taxes that state and local governmental agencies can receive and appropriate (authorize to spend) each year. The limit is dierent for each agency and the limit changes each year. The annual limit is based on the amount of tax proceeds that were authorized to be spent in FY 1978-79 in each agency, modied for changes in ination and population in each subsequent year. Proposition 111 was passed by the State’s voters in June 1990. This legislation made changes to the manner in which the Appropriations Limit is to be calculated: The annual adjustment factors for ination and population have been changed. Instead of using the lesser of California per capita income, or U.S. CPI, each agency may choose either the growth in the California per capita income, or the growth in assessed valuation due to new nonresidential construction within the agency. For population, instead of using only the population growth of an agency, each agency may choose to use the population growth within its county. These are both annual elections. The revised annual adjustment factors will be applied to the FY 1986-87 limit for most agencies and each year in between in order to calculate the FY 1990-91 limit. The actual limits for the intervening years, however, are not aected. Expenditures for “qualied capital outlay”, which are capital assets with a value of more than $100,000 and an expected life of 10 years or more, are excluded from the limit. An agency which exceeds the limit in any one year may choose to not give a tax refund if they fall below the limit in the next scal year. They then have two more years to refund any remaining excess or to obtain a successful override vote. In certain situations, proceeds of taxes may be spent on emergencies without having to reduce the limit in future years. Each agency also conducts a review of its Appropriations Limit during its annual nancial audit. The law requires a governing body to annually adopt, by resolution, an appropriations limit for the following year, along with a recorded vote regarding which of the annual adjustment factors have been selected. The Orange County Sanitation District’s appropriations limit and annual adjustment factors are adopted at the same meeting as the budget. The adjustment factors used for FY 2025-26 are the weighted average change in city population and the change in state per capita personal income. The following table shows the annual appropriations limit for each of the last two scal years and for FY 2025-26. The increase in the limit is based upon population changes ranging from negative 0.41 percent to positive 0.68 percent for representative cities within the Orange County Sanitation District’s service area and a per capita personal income change of 6.44 percent, as provided by the State Department of Finance. Annual Appropriation Limits: FY 2023-24 FY 2024-25 FY 2025-26 $137,371,868 $142,444,371 $151,435,847 As a result of the July 1998 consolidation of the Orange County Sanitation District, a single limit is presented in contrast to individual limits shown in years prior to 1998. Population changes for representative cities have continued to be used in order to ensure consistency and to eliminate signicant population growth in parts of the county outside of Orange County Sanitation District’s service area. This method results in a lower limit than using the county-wide change. BUDGET UPDATE - FISCAL YEAR 2025-26 APPROPRIATIONS LIMIT A-34 Miles of Sewers ........................... On-Plant Pump Station ............………………………. O-Plant Pump Stations ............................................... Operating Authority ........ ……………………………........................................… …………………........................ Authorized Sta (Full-Time Equivalent) ........... 182 MGD 208 MGD 182 MGD 150 MGD General Information Treatment Information Year of Formation .............................................................. Form of Government ................. Authority ................................................. ............................................... Service Area ...................................................... Service Population ...................... 2024-25 Assessed Value ................................. 1948 County Sanitation District Section 4700 et. seq California Health & Safety Code 479 sq. miles Approximately 2.6 million $613.8 Billion more than 380 miles 2 15 RWQCB/NPDES Permit No. CA0110604 WDR Order No. 2006-0003 664.5 Daily Inuent Flow to Total Primary Capacity Comparison (in MGD) FY23-24 Inuent BOD: Plant No. 1 ........................................... 279 milligrams per liter Plant No. 2 ........................................... 215milligrams per liter FY23-24 Inuent Suspended Solids: Plant No. 1 .......................................... 282 milligrams per liter Plant No. 2 ......................................... 298 milligrams per liter FY23-24 Euent BOD ............................. 16 milligrams per liter FY23-24 Euent Suspended Solids ..... 6 milligrams per liter FY23-24 Biosolids Produced & Reused ...... 187,156 wet tons Secondary Treatment Capacity: Plant No. 1.......................................................... Plant No. 2 ........................................................ TOTAL ............................................ Primary Treatment Capacity (includes standby): Plant No. 1 .................................................... Plant No. 2 ................................................... TOTAL ......................................390 MGD TOTAL ................................ 2024-25 Estimated Average Daily Inuent: Plant No. 1 .................................................. Plant No. 2 .................................................. 116 MGD 68 MGD 2024-25 Estimated Electricity Generated: Plant No. 1 ..................................... Plant No. 2 .............................. TOTAL ............................... 42,704,236 kwh 52,293,180 kwh 94,997,416 kwh 116116116 686868 184184184208208208182182182 390390390 2023-24 Estimated Influent Primary Treatment Capacity (includes stan… Plant 1 Plant 2 Total 0 250 500 Legend: MGD – million gallons per day kWh – kilowatts per hour 332 MGD MISCELLANEOUS STATISTICS BUDGET UPDATE - FISCAL YEAR 2025-26 A-35 184 MGD $ ,.$ ,.$ ,.$ ,. $ .$ .$ .$ . $ .$ .$ .$ . .%.%.%.% $ ,.-$ ,.$ ,. One-Time 3-Bedroom Residence Connection Average Annual Single-Family Residence Fee Local SRF Fee OC San's Avg. Share of Ad Valorem Property Tax Cost to Collect, Treat, & Dispose of One Million Gallons Financial Information Fees and Charges:2023-24 Actual 2024-25 Adopted 2025-26 Adopted 2025-26 Proposed Summary of COP Issues: A Series ,, C Series ,, A Series ,, A Series ,, A Series ,, A Series ,, A Series ,, Total Outstanding COP Balance $ ,, Series Outstanding Par BUDGET UPDATE - FISCAL YEAR 2025-26 MISCELLANEOUS STATISTICS A-36 $ 3,054.47 $ 3,445.75 $ 3,526.32 $ 3,648.44 Proposed FY 25-26 Budget Update Presented by: Ruth Zintzun Finance Manager Administration Committee June 11, 2025 2 •Stable revenues •Expenses include: •Operating •Capital Improvement Program •Debt service •Staffing: FY 2025-26 (664.5 FTE) •No new debt *All figures in millions unless otherwise noted Overview 06/03/2025 Page No. 1 3 Revenues Property Taxes $124M 21%Other $15M 3% Interest $26M 4% Fees and Charges $419M 71% Intradistrict Transfers $4M 1% Total Revenues - $588M Proposed Property Taxes $120M 21%Other $28M 5% Interest $17M 3% Fees and Charges $401M 70% Intradistrict Transfers $4M 1% Total Revenues - $570M Adopted Expenses 4 Adopted Operating $246.4 42% Capital $254.3 44% Debt $60.4 10% Other $20.2 4% Total Expenses - $581.3 Proposed Operating $238.1 40% Capital $279.4 48% Debt $60.4 10% Other $9.5 2% Total Expenses - $587.4 06/03/2025 Page No. 2 5 Revenues and Expenses $532M $555M $570M $588M FY 2 0 2 4 - 2 5 Ad o p t e d FY 2 0 2 4 - 2 5 Pr o j e c t e d FY 2 0 2 5 - 2 6 Ad o p t e d FY 2 0 2 5 - 2 6 Pr o p o s e d Revenues $525M $514M $587M $581M FY 2 0 2 4 - 2 5 Ad o p t e d FY 2 0 2 4 - 2 5 Pr o j e c t e d FY 2 0 2 5 - 2 6 Ad o p t e d FY 2 0 2 5 - 2 6 Pr o p o s e d Expenses 6 Proposed FY 2025-26 CIP Rehabilitation and Replacement 71% Strategic Initiatives 13% Additional Capacity 10% Regulatory 6% AdoptedAdopted Rehabilitation and Replacement 80% Strategic Initiatives 11%Additional Capacity 6% Regulatory 3% Proposed Net CIP- $254Net CIP- $279 06/03/2025 Page No. 3 7 10-Year Net CIP $0 $50 $100 $150 $200 $250 $300 $350 $400 $450 $500 FY 2 5 - 2 6 FY 2 6 - 2 7 FY 2 7 - 2 8 FY 2 8 - 2 9 FY 2 9 - 3 0 FY 3 0 - 3 1 FY 3 1 - 3 2 FY 3 2 - 3 3 FY 3 3 - 3 4 FY 3 4 - 3 5 Mi l l i o n s Authorized Projects Future Projects 8 Debt Service $0 $100 $200 $300 $400 $500 $600 $700 2 0 2 5 - 2 6 2 0 2 6 - 2 7 2 0 2 7 - 2 8 2 0 2 8 - 2 9 2 0 2 9 - 3 0 2 0 3 0 - 3 1 2 0 3 1 - 3 2 2 0 3 2 - 3 3 2 0 3 3 - 3 4 2 0 3 4 - 3 5 2 0 3 5 - 3 6 2 0 3 6 - 3 7 2 0 3 7 - 3 8 2 0 3 8 - 3 9 2 0 3 9 - 4 0 Mi l l i o n s •Total outstanding debt – $572 Million •No new debt planned •All debt to be paid off by 2040 06/03/2025 Page No. 4 9 Cash Flow 10 Cash Flow 20 2 5 - 2 6 20 2 6 - 2 7 20 2 7 - 2 8 20 2 8 - 2 9 20 2 9 - 3 0 20 3 0 - 3 1 20 3 1 - 3 2 20 3 2 - 3 3 20 3 3 - 3 4 20 3 4 - 3 5 Beginning 894 901 931 872 799 697 593 529 532 664 Revenues 588 618 611 636 662 689 715 744 778 814 Requirements 581 588 670 709 764 793 779 741 746 710 Ending 901 931 872 799 697 593 529 532 664 768 SFR Rate $385 $397 $411 $431 $452 $474 $497 $521 $547 $574 Rate Increases 3.77% 3.12% 3.53% 4.87% 4.87% 4.85% 4.85% 4.83% 4.99% 4.94% 06/03/2025 Page No. 5 11 •No new debt •Planned cash flow for healthy CIP •Rate increases below 5% •Conservative revenue assumptions •Constant monitoring throughout budget cycle Summary Key Meeting Dates January February March April May June Budget Assumptions and Calendar Board Revenues and Reserves Operations Administration Expenditures Operations Administration CIP Operations Administration Proposed 2-Year Budget Operations Administration Board Insurance Administration 12 06/03/2025 Page No. 6 13 RECOMMEND TO THE BOARD OF DIRECTORS TO: Approve the proposed Operating, Capital, Debt Service, and Self-Insurance Budgets for FY 2025-26 as follows: (1) Cash to/from Revenue Area 14 (RA14) in exchange for capital assets to/from Consolidated Revenue Area 15 (RA15) Recommendation FY 2025-26 Net Operating $ 246,365,399 Self-Insurance $ 6,745,565 Net Capital Improvement Program $ 254,276,633 Debt/COP Service $ 60,431,104 Intra-District Joint Equity Purchase/Sale (1) $ 3,500,000 Other Requirements $ 10,000,000 TOTAL $ 581,318,701 Questions? 14 06/03/2025 Page No. 7 BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4361 Agenda Date:6/25/2025 Agenda Item No:CS-1 FROM:Robert Thompson, General Manager SUBJECT: CONFERENCE WITH LABOR NEGOTIATORS - GOVERNMENT CODE SECTION 54957.6 RECOMMENDATION: Convene in Closed Session: Designated Representatives:General Manager Robert Thompson,Assistant General Manager Lorenzo Tyner, Director of Human Resources Laura Maravilla, and Chief Negotiator Laura Kalty. Employee Organizations: (3) International Union of Operating Engineers,Local 501;Orange County Employees Association;and the Supervisory and Professional Management Group. Unrepresented Employees: (3) Confidential Group, Manager Group, and Executive Managers Group. BACKGROUND During the course of conducting the business set forth on this agenda as a regular meeting of the Board,the Chairperson may convene the Board in closed session to consider matters of pending real estate negotiations, pending or potential litigation, or personnel matters. Reports relating to (a)purchase and sale of real property;(b)matters of pending or potential litigation;(c)employment actions or negotiations with employee representatives;or which are exempt from public disclosure under the California Public Records Act,may be reviewed by the Board during a permitted closed session and are not available for public inspection.At such time the Board takes final action on any of these subjects, the minutes will reflect all required disclosures of information. RELEVANT STANDARDS ·Government Code Sections 54956.8, 54956.9, 54957, or 54957.6, as noted ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Memorandum from General Counsel Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ Scott C. Smith (949) 263-6561 scott.smith@bbklaw.com 18101 Von Karman Avenue.Suite 1000.Irvine, CA 92612 Phone: (949) 263-2600 | Fax: (949) 260-0972 bbklaw.com Memorandum To: Honorable Chair and Members of the Orange County Sanitation District Board of Directors From: General Counsel Date: June 25, 2025 Re: Closed Session Items The Board will hold a closed session on June 25, 2025, for the purpose of holding a conference with its labor negotiators regarding employee compensation, terms of employment, and benefits. The closed session will be held pursuant to the authority of California Government Code section 54957.6. Respectfully submitted, SCOTT C. SMITH BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4362 Agenda Date:6/25/2025 Agenda Item No:CS-2 FROM:Robert Thompson, General Manager SUBJECT: CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(1) RECOMMENDATION: Convene in Closed Session: Number of Cases: 1 Julia Ha v.Orange County Sanitation District,Orange County Superior Court Case No.30-2025- 01484899-CU-WT-CJC BACKGROUND During the course of conducting the business set forth on this agenda as a regular meeting of the Board,the Chairperson may convene the Board in closed session to consider matters of pending real estate negotiations, pending or potential litigation, or personnel matters. Reports relating to (a)purchase and sale of real property;(b)matters of pending or potential litigation;(c)employment actions or negotiations with employee representatives;or which are exempt from public disclosure under the California Public Records Act,may be reviewed by the Board during a permitted closed session and are not available for public inspection.At such time the Board takes final action on any of these subjects, the minutes will reflect all required disclosures of information. RELEVANT STANDARDS ·Government Code Sections 54956.8, 54956.9, 54957, or 54957.6, as noted ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Memorandum from General Counsel Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ Scott C. Smith (949) 263-6561 scott.smith@bbklaw.com 18101 Von Karman Avenue.Suite 1000.Irvine, CA 92612 Phone: (949) 263-2600 | Fax: (949) 260-0972 bbklaw.com Memorandum To: Honorable Chair and Members of the Orange County Sanitation District Board of Directors From: General Counsel Date: June 25, 2025 Re: Closed Session Items The Board will hold a closed session on June 25, 2025, for the purpose of conferring with its legal counsel regarding existing litigation to which the Orange County Sanitation District is a party. The title of the matter is Julia Ha v. Orange County Sanitation District, Orange County Superior Court Case No. 30-2025-01484899-CU-WT-CJC. The closed session will be held pursuant to the authority of California Government Code section 54956.9(d)(1). Respectfully submitted, SCOTT C. SMITH BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4363 Agenda Date:6/25/2025 Agenda Item No:CS-3 FROM:Robert Thompson, General Manager SUBJECT: CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(1) RECOMMENDATION: Convene in Closed Session: Number of Cases: 1 Joe Lara v.Orange County Sanitation District,Orange County Superior Court Case No.30-2025- 01451615-CU-OE-CJC BACKGROUND During the course of conducting the business set forth on this agenda as a regular meeting of the Board,the Chairperson may convene the Board in closed session to consider matters of pending real estate negotiations, pending or potential litigation, or personnel matters. Reports relating to (a)purchase and sale of real property;(b)matters of pending or potential litigation;(c)employment actions or negotiations with employee representatives;or which are exempt from public disclosure under the California Public Records Act,may be reviewed by the Board during a permitted closed session and are not available for public inspection.At such time the Board takes final action on any of these subjects, the minutes will reflect all required disclosures of information. RELEVANT STANDARDS ·Government Code Sections 54956.8, 54956.9, 54957, or 54957.6, as noted ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Memorandum from General Counsel Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ Scott C. Smith (949) 263-6561 scott.smith@bbklaw.com 18101 Von Karman Avenue.Suite 1000.Irvine, CA 92612 Phone: (949) 263-2600 | Fax: (949) 260-0972 bbklaw.com Memorandum To: Honorable Chair and Members of the Orange County Sanitation District Board of Directors From: General Counsel Date: June 25, 2025 Re: Closed Session Items The Board will hold a closed session on June 25, 2025, for the purpose of conferring with its legal counsel regarding existing litigation to which the Orange County Sanitation District is a party. The title of the matter is Joe Lara v. Orange County Sanitation District, Orange County Superior Court Case No. 30-2025-01451615-CU-OE-CJC. The closed session will be held pursuant to the authority of California Government Code section 54956.9(d)(1). Respectfully submitted, SCOTT C. SMITH BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4364 Agenda Date:6/25/2025 Agenda Item No:CS-4 FROM:Robert Thompson, General Manager SUBJECT: CONFERENCE WITH LEGAL COUNSEL RE EXISTING LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(1) RECOMMENDATION: Convene in Closed Session: Number of Cases: 1 Danny Letner,Inc.dba Letner Roofing Company v.Orange County Sanitation District,et al,Orange County Superior Court Case No. 30-2025-01484794-CU-OR-CJC BACKGROUND During the course of conducting the business set forth on this agenda as a regular meeting of the Board,the Chairperson may convene the Board in closed session to consider matters of pending real estate negotiations, pending or potential litigation, or personnel matters. Reports relating to (a)purchase and sale of real property;(b)matters of pending or potential litigation;(c)employment actions or negotiations with employee representatives;or which are exempt from public disclosure under the California Public Records Act,may be reviewed by the Board during a permitted closed session and are not available for public inspection.At such time the Board takes final action on any of these subjects, the minutes will reflect all required disclosures of information. RELEVANT STANDARDS ·Government Code Sections 54956.8, 54956.9, 54957, or 54957.6, as noted ATTACHMENT The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda package: ·Memorandum from General Counsel Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ Scott C. Smith (949) 263-6561 scott.smith@bbklaw.com 18101 Von Karman Avenue.Suite 1000.Irvine, CA 92612 Phone: (949) 263-2600 | Fax: (949) 260-0972 bbklaw.com Memorandum To: Honorable Chair and Members of the Orange County Sanitation District Board of Directors From: General Counsel Date: June 25, 2025 Re: Closed Session Items The Board will hold a closed session on June 25, 2025, for the purpose of conferring with its legal counsel regarding existing litigation to which the Orange County Sanitation District is a party. The title of the matter is Danny Letner, Inc. dba Letner Roofing Company v. Orange County Sanitation District, Orange County Superior Court Case No. 30-2025-01484794-CU-OR-CJC. The closed session will be held pursuant to the authority of California Government Code section 54956.9(d)(1). Respectfully submitted, SCOTT C. SMITH BOARD OF DIRECTORS Agenda Report Headquarters 18480 Bandilier Circle Fountain Valley, CA 92708 (714) 593-7433 File #:2025-4365 Agenda Date:6/25/2025 Agenda Item No:CS-5 FROM:Robert Thompson, General Manager SUBJECT: CONFERENCE WITH REAL PROPERTY NEGOTIATORS - GOVERNMENT CODE SECTION 54956.8 RECOMMENDATION: Convene in Closed Session: Property: 10700 Spencer Street, Fountain Valley, CA - APN No.156-154-07 and 156-163-16. Agency negotiators:General Manager Rob Thompson;Assistant General Manager Lorenzo Tyner; and Director of Finance Wally Ritchie. Negotiating parties: Shabtai Itzhak Tr Ins Tr Under negotiation: Terms of payment BACKGROUND During the course of conducting the business set forth on this agenda as a regular meeting of the Board,the Chairperson may convene the Board in closed session to consider matters of pending real estate negotiations, pending or potential litigation, or personnel matters. Reports relating to (a)purchase and sale of real property;(b)matters of pending or potential litigation;(c)employment actions or negotiations with employee representatives;or which are exempt from public disclosure under the California Public Records Act,may be reviewed by the Board during a permitted closed session and are not available for public inspection.At such time the Board takes final action on any of these subjects, the minutes will reflect all required disclosures of information. RELEVANT STANDARDS ·Government Code Sections 54956.8, 54956.9, 54957, or 54957.6, as noted ATTACHMENT The following attachment(s)are included in hard copy and may also be viewed on-line at the OCSD website (www.ocsd.com) with the complete agenda package: ·Memorandum from General Counsel Orange County Sanitation District Printed on 6/18/2025Page 1 of 1 powered by Legistar™ Scott C. Smith (949) 263-6561 scott.smith@bbklaw.com 18101 Von Karman Avenue.Suite 1000.Irvine, CA 92612 Phone: (949) 263-2600 | Fax: (949) 260-0972 bbklaw.com Memorandum To: Honorable Chair and Members of the Orange County Sanitation District Board of Directors From: General Counsel Date: June 25, 2025 Re: Closed Session Items The Board will hold a closed session on June 25, 2025, for the purpose of holding a conference with its real property negotiators regarding negotiation of the potential acquisition of real property located at 10700 Spencer Street in Fountain Valley, California-APN 156-154-07 and APN 156- 163-16. The closed session will be held pursuant to the authority of California Government Code section 54956.8. Respectfully submitted, SCOTT C. SMITH ORANGE COUNTY SANITATION DISTRICT COMMON ACRONYMS ACWA Association of California Water Agencies LOS Level Of Service RFP Request For Proposal APWA American Public Works Association MGD Million Gallons Per Day RWQCB Regional Water Quality Control Board AQMD Air Quality Management District MOU Memorandum of Understanding SARFPA Santa Ana River Flood Protection Agency ASCE American Society of Civil Engineers NACWA National Association of Clean Water Agencies SARI Santa Ana River Interceptor BOD Biochemical Oxygen Demand NEPA National Environmental Policy Act SARWQCB Santa Ana Regional Water Quality Control Board CARB California Air Resources Board NGOs Non-Governmental Organizations SAWPA Santa Ana Watershed Project Authority CASA California Association of Sanitation Agencies NPDES National Pollutant Discharge Elimination System SCADA Supervisory Control And Data Acquisition CCTV Closed Circuit Television NWRI National Water Research Institute SCAP Southern California Alliance of Publicly Owned Treatment Works CEQA California Environmental Quality Act O & M Operations & Maintenance SCAQMD South Coast Air Quality Management District CIP Capital Improvement Program OCCOG Orange County Council of Governments SOCWA South Orange County Wastewater Authority CRWQCB California Regional Water Quality Control Board OCHCA Orange County Health Care Agency SRF Clean Water State Revolving Fund CWA Clean Water Act OCSD Orange County Sanitation District SSMP Sewer System Management Plan CWEA California Water Environment Association OCWD Orange County Water District SSO Sanitary Sewer Overflow EIR Environmental Impact Report OOBS Ocean Outfall Booster Station SWRCB State Water Resources Control Board EMT Executive Management Team OSHA Occupational Safety and Health Administration TDS Total Dissolved Solids EPA US Environmental Protection Agency PCSA Professional Consultant/Construction Services Agreement TMDL Total Maximum Daily Load FOG Fats, Oils, and Grease PDSA Professional Design Services Agreement TSS Total Suspended Solids gpd gallons per day PFAS Per- and Polyfluoroalkyl Substances WDR Waste Discharge Requirements GWRS Groundwater Replenishment System PFOA Perfluorooctanoic Acid WEF Water Environment Federation ICS Incident Command System PFOS Perfluorooctanesulfonic Acid WERF Water Environment & Reuse Foundation IERP Integrated Emergency Response Plan POTW Publicly Owned Treatment Works WIFIA Water Infrastructure Finance and Innovation Act JPA Joint Powers Authority ppm parts per million WIIN Water Infrastructure Improvements for the Nation Act LAFCO Local Agency Formation Commission PSA Professional Services Agreement WRDA Water Resources Development Act ORANGE COUNTY SANITATION DISTRICT GLOSSARY OF TERMS ACTIVATED SLUDGE PROCESS – A secondary biological wastewater treatment process where bacteria reproduce at a high rate with the introduction of excess air or oxygen and consume dissolved nutrients in the wastewater. BENTHOS – The community of organisms, such as sea stars, worms, and shrimp, which live on, in, or near the seabed, also known as the benthic zone. BIOCHEMICAL OXYGEN DEMAND (BOD) – The amount of oxygen used when organic matter undergoes decomposition by microorganisms. Testing for BOD is done to assess the amount of organic matter in water. BIOGAS – A gas that is produced by the action of anaerobic bacteria on organic waste matter in a digester tank that can be used as a fuel. BIOSOLIDS – Biosolids are nutrient rich organic and highly treated solid materials produced by the wastewater treatment process. This high-quality product can be recycled as a soil amendment on farmland or further processed as an earth-like product for commercial and home gardens to improve and maintain fertile soil and stimulate plant growth. CAPITAL IMPROVEMENT PROGRAM (CIP) – Projects for repair, rehabilitation, and replacement of assets. Also includes treatment improvements, additional capacity, and projects for the support facilities. COLIFORM BACTERIA – A group of bacteria found in the intestines of humans and other animals, but also occasionally found elsewhere, used as indicators of sewage pollution. E. coli are the most common bacteria in wastewater. COLLECTIONS SYSTEM – In wastewater, it is the system of typically underground pipes that receive and convey sanitary wastewater or storm water. CERTIFICATE OF PARTICIPATION (COP) – A type of financing where an investor purchases a share of the lease revenues of a program rather than the bond being secured by those revenues. CONTAMINANTS OF POTENTIAL CONCERN (CPC) – Pharmaceuticals, hormones, and other organic wastewater contaminants. DILUTION TO THRESHOLD (D/T) – The dilution at which the majority of people detect the odor becomes the D/T for that air sample. GREENHOUSE GASES (GHG) – In the order of relative abundance water vapor, carbon dioxide, methane, nitrous oxide, and ozone gases that are considered the cause of global warming (“greenhouse effect”). GROUNDWATER REPLENISHMENT SYSTEM (GWRS) – A joint water reclamation project that proactively responds to Southern California’s current and future water needs. This joint project between the Orange County Water District and OCSD provides 70 million gallons per day of drinking quality water to replenish the local groundwater supply. LEVEL OF SERVICE (LOS) – Goals to support environmental and public expectations for performance. N-NITROSODIMETHYLAMINE (NDMA) – A N-nitrosamine suspected cancer-causing agent. It has been found in the GWRS process and is eliminated using hydrogen peroxide with extra ultra-violet treatment. NATIONAL BIOSOLIDS PARTNERSHIP (NBP) – An alliance of the NACWA and WEF, with advisory support from the EPA. NBP is committed to developing and advancing environmentally sound and sustainable biosolids management practices that go beyond regulatory compliance and promote public participation to enhance the credibility of local agency biosolids programs and improved communications that lead to public acceptance. PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) – A large group (over 6,000) of human-made compounds that are resistant to heat, water, and oil and used for a variety of applications including firefighting foam, stain and water-resistant clothing, cosmetics, and food packaging. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA) have been the focus of increasing regulatory scrutiny in drinking water and may result in adverse health effects including developmental effects to fetuses during pregnancy, cancer, liver damage, immunosuppression, thyroid effects, and other effects. PERFLUOROOCTANOIC ACID (PFOA) – An ingredient for several industrial applications including carpeting, upholstery, apparel, floor wax, textiles, sealants, food packaging, and cookware (Teflon). PERFLUOROOCTANESULFONIC ACID (PFOS) – A key ingredient in Scotchgard, a fabric protector made by 3M, and used in numerous stain repellents. PLUME – A visible or measurable concentration of discharge from a stationary source or fixed facility. PUBLICLY OWNED TREATMENT WORKS (POTW) – A municipal wastewater treatment plant. SANTA ANA RIVER INTERCEPTOR (SARI) LINE – A regional brine line designed to convey 30 million gallons per day of non-reclaimable wastewater from the upper Santa Ana River basin to the ocean for disposal, after treatment. SANITARY SEWER – Separate sewer systems specifically for the carrying of domestic and industrial wastewater. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) – Regional regulatory agency that develops plans and regulations designed to achieve public health standards by reducing emissions from business and industry. SECONDARY TREATMENT – Biological wastewater treatment, particularly the activated sludge process, where bacteria and other microorganisms consume dissolved nutrients in wastewater. SLUDGE – Untreated solid material created by the treatment of wastewater. TOTAL SUSPENDED SOLIDS (TSS) – The amount of solids floating and in suspension in wastewater. ORANGE COUNTY SANITATION DISTRICT GLOSSARY OF TERMS TRICKLING FILTER – A biological secondary treatment process in which bacteria and other microorganisms, growing as slime on the surface of rocks or plastic media, consume nutrients in wastewater as it trickles over them. URBAN RUNOFF – Water from city streets and domestic properties that carry pollutants into the storm drains, rivers, lakes, and oceans. WASTEWATER – Any water that enters the sanitary sewer. WATERSHED – A land area from which water drains to a particular water body. OCSD’s service area is in the Santa Ana River Watershed.