HomeMy WebLinkAboutResolution 1964 - 0029 (2)RESOLUTION NO. 64-29
ACCEPTING JOB NO. PW-014 AS COMPLETE
A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS OF
COUNTY SANITATION DISTRICTS NOS. 1, 2, 3, 5, 6, 7
AND 11 OF ORANGE COUNTY, CALIFORNIA, ACCEPTING AS
COMPLETED THE CONSTRUCTION OF ADDITIONAL PAVING
AT PLANT NO. 2, JOB NO. PW-014 AS COMPLETE
The Boards or Directors of County Sanitation Districts
Nos. 1, 2, 3, 5, 6, 7 and 11, of Orange County, California,
DO HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1. That the Contractor, R. W. McCLELLAN AND SONS,
has completed the construction in accordance with the terms of the
contract for the construction or ADDITIONAL PAVING AT TREATMENT
PLANT NO. 2, SPECIFICATION #PW-014, on the 3rd day of March, 1964;
and,
Section 2. That by letter the Construction Engineer for
the Districts has recommended acceptance of said work as having.
been completed in accordance with the terms of the contract; and,
Section 3. That the General Manager of the Districts has
concurred in said Engineer's recommendation, which said recommenda-
tion is hereby received and ordered filed; and,
Section 4. That the ADDITIONAL PAVING AT TREATMENT
PLANT NO. 2, SPECIFICATION#PW-014, is hereby accepted as completed
in accordance with the terms of the contract for the construction
thereof dated the 28th day of November, 1963; and,
Section 5. That the Chairman of County Sanitation
District No. 1 is hereby authorized and directed to execute a
Notice of Completion of Work therefor.
-I-
l.
COUNTY SANITATION DISTRICTS Oi .ORANGE COUNTY
P. o. BOX 5175 -10844 Ellis Avenue
Fountain Valley, California
CHANGE ORDER C. O. NO. 2 ----
DATE: March 11, 1964 Secondary Treatment,at Plant No. l,
JOB: Phase I Job No. Pl-9
CONTRACTOR: J. Putnam Henck --------~-------..__ ______________________ __
Amount or this change order (ADD)(~) $ 3,156.83
In accordance with contract provisions, the: followirlg changes in
the contract and/or contract work are hereby authorized and as com-
pensation therefor, the following additions to or deductions from the
contract price are hereby approved.
REFERENCE: Contractor's proposals dated Februeay 10 and March 3, 1964
and Contract Revision No. 2 previously furnished
contractor
1. Relocate digester waste gas burner, as specified
2. Provide thermal protectors and space heaters for
motors on four Mixed Flow Vertical Pumps, as
specified
3. Revise Switching Building floor and roof, as
specified
4. Drive concrete piling beyond footage called for ,
on plans to obtain specified bearing capacity
and as directed (Item No. 4 of Contract)
447 L.F. @ $4.50/L.F.
TOTAL CHANGE ORDER ADD
334.00
809.53
no cost
2,013.30
$ 3,156.83
Original contract price $ 1,784,569.00
Prev. authorized changes ADD 390.00
This change (ADD)(~) 3,156.83
Amended Contract
Board authorization date:
March 11, 1964
Price $ 11788,115.83
Approved:
-J-
COUNTY SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNIA
By /s/ Lee M. Nelson
General Manager
J. PUTNAM HENCK
By ____________________________ __