HomeMy WebLinkAboutResolution 1994 - 0034Approving Addendum No. 2 to the plans and specifications for Job Nos. P1-48, P2-47-2, P2-56 and P2-53-2 Moved, seconded and duly carried: 03/09/94 That Addendum No. 2 to the plans and specifications for Miscellaneous Architectural and Treatment Plant Improvements at Plant No. 1, Job No. P1-48; Miscellaneous Work (re Facility Modifications and Safety Upgrades at Plant No. 2), Job No. P2-4 7-2; Flare Improvements at Plant No. 2, Job No. P2-56; and Seismic Retrofit of Structures at Treatment Plant No. 2, Job No. P2-53-2, making miscellaneous technical clarifications, be, and is hereby, approved. Awarding Job Nos. P1-48, P2-47-2. P2-56 and P2-53-2 to Pascal & Ludwig Engineers Moved, seconded and duly carried: That the Boards of Directors hereby adopt Resolution No. 94-34, receiving and filing bid tabulation and recommendation and awarding contract for Miscellaneous Architectural and Treatment Plant Improvements at Plant No. 1, Job No. P1-48; Miscellaneous Work (re Facility Modifications and Safety Upgrades at Plant No. 2), 0 Job No. P2-47-2; Flare Improvements at Plant No. 2, Job No. P2-56; and Seismic 0 Retrofit of Structures at Treatment Plant No. 2, Job No. P2-53-2, to Pascal & Ludwig Engineers, in the total amount of $1,003,899.00. Said resolution, by reference hereto, is hereby made a part of these minutes. Continuing consideration of action adopting Resolution No. 94-34 awarding Job Nos. P1-48, P2-47-2. P2-56 and P2-53-2 to Pascal & Ludwig Engineers Upon return from closed session where the Boards received a report from the General Counsel pertaining to potential litigation against the Districts as owners for work being performed by Pascal & Ludwig Engineers on Miscellaneous Improvements and Plant No. 1, Job No. P1-42, and Miscellaneous Improvements at Plant No. 2, Job No. P2-49, during which two of the contractor's employees were killed in an industrial accident, the Directors entered into a lengthy discussion concerning the propriety of awarding the contract for Miscellaneous Architectural and Treatment Plant Improvements at Plant No. 1, Job No. P1 -48; Miscellaneous Work (re Facility Modifications and Safety Upgrades at Plant No. 2), Job No. P2-47-2; Flare Improvements at Plant No. 2, Job No. P2-56; and Seismic Retrofit of Structures at Treatment Plant No. 2, Job No. P2-53-2, to Pascal & Ludwig Engineers, because of questions about the accident on Job No. P2-49. -11- 0 03/09/94 It was then moved and seconded: That the Boards of Directors reconsider the previous action adopting Resolution No. 94-34, awarding contract for Miscellaneous Architectural and Treatment Plant Improvements at Plant No. 1, Job No. P1 -48; Miscellaneous Work (re Facility Modifications and Safety Upgrades at Plant No. 2), Job No. P2-4 7-2, Flare Improvements at Plant No. 2, Job No. P2-56; and Seismic Retrofit of Structures at Treatment Plant No. 2, Job No. P2-53-2, to Pascal & Ludwig Engineers in the total amount of $1,003,899.00. The project was bid on February 1, 1994 and, according to the plans and specifications, the Districts have 60 days to award the contract (April 2, 1994). The Boards discussed whether to seek an extension of the 60-day award period from the contractor to allow a review of the circumstances pertaining to the accident or whether to reject all bids and rebid the job. Following further discussion the motion was withdrawn and a new motion was made and seconded: That all bids received for Miscellaneous Architectural and Treatment Plant Improvements at Plant No. 1, Job No. P1 -48; Miscellaneous Work (re Facility Modifications and Safety Upgrades at Plant No. 2), Job No. P2-4 7-2; Flare Improvements at Plant No. 2, Job No. P2-56; and Seismic Retrofit of Structures at Treatment Plant No. 2, Job No. P2-53-2, be rejected. In the context of overall considerations, Directors pointed out that extending the award period would allow a review of the Districts' and contractors' safe work environment issues together with safety policies and procedures. Following further discussion the motion to reject all bids was withdrawn. It was then moved, seconded and duly carried: That the prior action to adopt Resolution No. 94-34 be set aside; and that action to adopt Resolution No. 94-34 awarding a contract for the listed jobs be continued for 60 days; and that staff be directed to confer with Pascal & Ludwig Engineers, the low bidder for said project, to obtain their consent to a delay in the award beyond that prescribed in the contract documents to allow the Districts to review safety procedures, policies, practices and records for construction on Districts' property. It was noted that if this consent was not granted by the low bidder, then all bids would expire and the project would have to be rescheduled for re-bidding. -12-