Loading...
HomeMy WebLinkAboutResolution 1982 - 0003‘1/13/82 for 75—MGD Improved Treatment at Plant No.2,Job No.P2—23—6 ,authorizing an addition of $86,453.00 to the contract with H.C.Smith Construction Company for construction of junction structure and redesign of propane building,be,and is hereby,approved.A copy of this change order is attached hereto and made a part of these minutes. ALL DISTRICTS Approving Change Order No.2 to plans and specifications re Job No.P1—19 ALL DISTRICTS Approving plans and specifications re Rehabilitation of Ellis Force Main.Job No.I-lR-l ___________________________________ That the Boards of Directors hereby --adopt Resolution No.82—2,approving plans and specifications for Rehabilitation of Ellis Avenue Force Main,Job No.I—1R—1,and authorizing the General Manager to establish the date for receipt of bids.A certified copy of this resolution is attached hereto and made a part of these minutes. ALL DISTRICTS Approving Addendum No.2 to kgreement with John Carollo Engineers re Flow Equalization and Hydraulic Reliability Facilities at Plant No.2 ALL DISTRICTS Awarding Miscellaneous Paving Job No.PW—090 ___________________________________ That the Boards of Directors hereby adopt Resolution No.82—4,to receive and file bid tabulation and recommendation and awarding contract for Miscellaneous Paving at Treatment Plant No.1,Job No.PW—090,to Griffith Company in the amount of $43,851.00.A certified copy of this resolution is attached hereto and made a part of these minutes. ALL DISTRICTS Authorizing General Manager to issue purchase order contract re Uniform Rental,Specification No.P—044 Moved,seconded and duly carried: That the bid tabulation and recommendation for Uniform Rental, Specification No.P—044,be,and is hereby,received and ordered filed;and, FURTHER MOVED:That the General Manager be,and is hereby,authorized to issue a purchase order contract to L &N Uniform Supply Company in accordance with the unit prices contained in their proposal for said Specification No.P—044. Moved,seconded and duly carried: ___________________________________ That Change Order No.2 to the plans and ___________________________________ specifications for Construction of Belt Filter Press Facility at Reclamation Plant No.1,Job No.P1—19,authorizing an addition of $7,040.00 to the contract with The Waldinger Corporation for waterproofing of the basement tunnels,be,and is hereby,approved.A copy of this change order is attached hereto and made a part of these minutes. Moved,seconded and duly carried: Moved,seconded and duly carried: __________________________________ That the Boards of Directors hereby _____________________________— adopt Resolution No.82—3,approving __________________________________ Addendum No.2 to Agreement with John ___________________________________ Carollo Engineers re Flow Equalization and Hydraulic Reliability Facilities at Plant No.2,providing for additional engineering services required to review shop drawings for Flow Equalization Facilities at Plant No.2 (Basins),Job No. P2—25—lA,for an amount not to exceed $9,500.00.A certified copy of this resolution is attached hereto and made a part of these minutes. Moved,seconded and duly carried: —6—