Why is Asset Management Important?
What is Asset Management?
What is Asset Management?
1.What do we own?
2.What condition is it in?
3.What is our plan to operate,
maintain, rehabilitate and replace
our assets?
Asset Life Cycle
Plan and Budget
Design and Construct
Operate and Maintain
Asset Monitoring
Rehabilitate or Replace
Asset Life Cycle
Plan and Budget
Design and Construct
Operate and Maintain
Asset Monitoring
Rehabilitate or Replace
Asset Life Cycle
Plan and Budget
Design and Construct
Operate and Maintain
Asset Monitoring
Rehabilitate or Replace
Asset Life Cycle
Plan and Budget
Design and Construct
Operate and Maintain
Asset Monitoring
Rehabilitate or Replace
Asset Life Cycle
Plan and Budget
Design and Construct
Operate and Maintain
Asset Monitoring
Rehabilitate or Replace
Asset Life Cycle
Plan and Budget
Design and Construct
Operate and Maintain
Asset Monitoring
Rehabilitate or Replace
OCSD Assets Valued at $10.7 Billion
$30,000 $10,700,000,000Vs.
Typical Asset Management Program
•Theoretical
•Outside consultant
•Infrequent updates
•Provides rough budget projections
•Product is a report, not a plan
•Project prioritization could be biased
OCSD’s Asset Management Program
•Tactical
•Dedicated in-house staff
•Continuously updated
•Product is a plan that is specific, coordinated, efficient, well
thought out
•More accurate budget projection
•Project prioritization based on condition
Know What We Own and Its Condition
Asset Type
PE
P
S
Ae
r
a
t
i
o
n
Ba
s
i
n
s
Se
c
o
n
d
a
r
y
Cl
a
r
i
f
i
e
r
s
A
-L
SE
J
B
Ea
s
t
R
A
S
/
WA
S
P
S
We
s
t
R
A
S
/
WA
S
P
S
Ox
y
g
e
n
Fa
c
i
l
i
t
y
DA
F
T
s
A
-D
DA
F
T
s
Po
l
y
m
e
r
S
y
s
.
DA
F
T
s
O
d
o
r
Co
n
t
r
o
l
WS
S
P
S
Civil
Effluent Piping 2 -3 3 4 4 ----4
Structural
Building 2 ---2 2 -1 ---
Structure 2 4 3 3 ---1 1 1 -
Mechanical
Pump 2 ---3 3 -2 2 -3
Aerator -4 ---------
Piping and Valve 3 3 3 3 3 3 3 2 2 3 3
Clarifier/DAFT Moving Mechanism --5 ----2 ---
Channel Air Blower -----4 -----
Control Gate -3 5 3 -----2 -
LOX Facility ------3 ----
HVAC & Ventilation 2 ---3 3 -----
Crane 3 ----------
Electrical
MCC & VFD 4 3 3 -4 4 -3 3 3 3
Instrumentation
PLC & Flow Meter 3 3 3 -3 3 3 3 3 -3
20-Year Plan for All Assets
Project No.Project Title Impacted Facilities
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
MP-248 Plant No. 2 Secondary Clarifiers D, G,
L, J, F, C Repairs Secondary clarifiers
PRN-00457 Activated Sludge Plant Clarifier Inlet
Gate Replacement at Plant No. 2 Secondary clarifiers
P2-122 P2-122 -Headworks Modifications at
Plant No. 2 for GWRS Final
Expansion
Activated Sludge facility,
WSSPS
P2-123 Return Activated Sludge Piping
Replacement at Plant No. 2
RSS pump stations and
secondary clarifiersPRN -00573 (MP-513)Plant No. 1, Plant No. 2, Collections
VFD Drives Replacement PEPS, RSS pump stations
X-50 Activated Sludge Aeration Basin
Rehab. at Plant No. 2
Activated Sludge aeration
basins
X-52 Activated Sludge
RAS/WAS/PEPS/Vaporizers
Rehabilitation at Plant No. 2
Activated Sludge facility
PRN-00572 Plant No. 2 AS Plant Clarifiers
Rehabilitation -Phase 2 Secondary clarifiers
Current and Future Projects
Example: Plant 2 Activated Sludge Clarifiers
Corroded/Broken
Inlet Gates
Insufficient Lighting
Broken Clarifier Mechanism
Critical Assets Condition Plan
Clarifier Mechanisms ?Comprehensive Rehabilitation Project
•Budget: $17M
•Duration: 7 years+
Inlet Gates ?
Area Lights ?
Clarifier Structure ?
Clarifier Motor and Drives ?
Meters and PLCs ?
Example: Plant 2 Activated Sludge Clarifiers
Critical Assets Condition Plan
Clarifier Mechanisms 5 Comprehensive Rehabilitation Project
•Budget: $17M
Four small projects. Total Budget: $7.2M
Inlet Gates 5
Area Lights 5
Clarifier Structure 3 Monitor condition, repair/replace as
neededClarifier Motor and Drives 3
Meters and PLCs 3
Example: Plant 2 Activated Sludge Clarifiers
Critical Assets Condition Plan
Clarifier Mechanisms 5 Comprehensive Rehabilitation Project
•Budget: $17M
Four small projects. Total Budget: $7.2M
Inlet Gates 5
Area Lights 5
Clarifier Structure 3 Monitor condition, repair/replace as
neededClarifier Motor and Drives 3
Meters and PLCs 3
Example: Plant 2 Activated Sludge Clarifiers
Asset Management Benefits:
Addresses risks more quickly and efficiently
Minimizes impacts to operations
Minimizes life cycle costs
OCSD is a Leader in Asset Management
Comprehensive 20-year CIP
$10.7B
assets
Known Asset
Replacement Value
Comprehensive condition
assessment program Tactical Asset Management Proactive Maintenance
Rate structure supporting
the 20-year CIP