March 4, 2020
NOTICE OF MEETING
ADMINISTRATION COMMITTEE
ORANGE COUNTY SANITATION DISTRICT
Wednesday, March 11, 2020 – 5:00 P.M.
Administration Building
10844 Ellis Avenue
Fountain Valley, California 92708
WWW.OCSD.COM
A regular meeting of the Administration Committee of the Orange County
Sanitation District will be held at the above location, date, and time.
ADMINISTRATION COMMITTEE MEETING DATE
BOARD MEETING DATE
03/11/20 03/25/20
04/08/30 04/22/20
05/13/20 05/27/20
06/10/20 06/24/20
07/08/20 07/22/20
AUGUST DARK 08/26/20
09/09/20 09/23/20
10/14/20 10/28/20
11/10/20 * 11/18/20 **
12/09/20 12/16/20 **
JANUARY DARK 01/27/21
02/10/21 02/24/21
* Meeting will be held on the second Tuesday of the month
** Meeting will be held on the third Wednesday of the month
ROLL CALL ADMINISTRATION COMMITTEE Finance, Information Technology, Environmental Services
and Human Resources
Meeting Date: March 11, 2020 Time: 5:00 p.m. Adjourn:
COMMITTEE MEMBERS (13)
Chad Wanke, Chair
Richard Murphy, Vice-Chair Jim Ferryman
Cecilia Iglesias
Peter Kim
Mark Murphy
Steve Nagel
Andrew Nguyen
Glenn Parker
Erik Peterson
Christina Shea
David Shawver (Board Chair) John Withers (Board Vice-Chair)
OTHERS
Brad Hogin, General Counsel
STAFF
Jim Herberg, General Manager Rob Thompson, Assistant General Manager
Lorenzo Tyner, Assistant General Manager
Celia Chandler, Director of Human Resources Kathy Millea, Director of Engineering
Lan Wiborg, Director of Environmental Services
Kelly Lore, Clerk of the Board
ORANGE COUNTY SANITATION DISTRICT Effective 02/19/2020 BOARD OF DIRECTORS Complete Roster AGENCY/CITIES
ACTIVE DIRECTOR
ALTERNATE DIRECTOR
Anaheim
Lucille Kring
Denise Barnes Brea Glenn Parker Cecilia Hupp Buena Park Fred Smith Connor Traut Cypress Mariellen Yarc Stacy Berry Fountain Valley Steve Nagel Patrick Harper Fullerton Jesus J. Silva Jan Flory Garden Grove Steve Jones John O’Neill Huntington Beach Erik Peterson Lyn Semeta Irvine Christina Shea Anthony Kuo
La Habra Tim Shaw Rose Espinoza La Palma Peter Kim Nitesh Patel Los Alamitos Richard Murphy Dean Grose Newport Beach Brad Avery Joy Brenner Orange Mark Murphy Kim Nichols Placentia Chad Wanke Ward Smith Santa Ana Cecilia Iglesias David Penaloza Seal Beach Sandra Massa-Lavitt Schelly Sustarsic Stanton David Shawver Carol Warren Tustin Allan Bernstein Chuck Puckett Villa Park Robert Collacott Chad Zimmerman Sanitary/Water Districts
Costa Mesa Sanitary District
James M. Ferryman
Bob Ooten Midway City Sanitary District Andrew Nguyen Margie L. Rice Irvine Ranch Water District John Withers
Douglas Reinhart
Yorba Linda Water District Brooke Jones Phil Hawkins County Areas
Board of Supervisors Doug Chaffee Donald P. Wagner
Orange County Sanitation District
ADMINISTRATION COMMITTEE
Regular Meeting Agenda
Wednesday, March 11, 2020 - 5:00 PM
Board Room
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
ACCOMMODATIONS FOR THE DISABLED: Meeting Rooms are wheelchair accessible. If you require any
special disability related accommodations, please contact the Orange County Sanitation District Clerk of the
Board’s office at (714) 593-7433 at least 72 hours prior to the scheduled meeting. Requests must specify the
nature of the disability and the type of accommodation requested.
AGENDA POSTING: In accordance with the requirements of California Government Code Section 54954.2, this
agenda has been posted outside the main gate of the Sanitation District’s Administration Building located at
10844 Ellis Avenue, Fountain Valley, California, and on the Sanitation District’s website at www.ocsd.com not
less than 72 hours prior to the meeting date and time above. All public records relating to each agenda item,
including any public records distributed less than 72 hours prior to the meeting to all, or a majority of the
Board of Directors, are available for public inspection in the office of the Clerk of the Board.
AGENDA DESCRIPTION: The agenda provides a brief general description of each item of business to be
considered or discussed. The recommended action does not indicate what action will be taken. The Board of
Directors may take any action which is deemed appropriate.
MEETING AUDIO: An audio recording of this meeting is available within 24 hours after adjournment of the
meeting. Please contact the Clerk of the Board's office at (714) 593-7433 to request the audio file.
NOTICE TO DIRECTORS: To place items on the agenda for a Committee or Board Meeting, the item must be
submitted in writing to the Clerk of the Board: Kelly A. Lore, MMC, (714) 593-7433 / klore@ocsd.com at least 14
days before the meeting.
FOR ANY QUESTIONS ON THE AGENDA, BOARD MEMBERS MAY CONTACT STAFF AT:
General Manager: Jim Herberg, jherberg@ocsd.com / (714) 593-7300
Asst. General Manager: Lorenzo Tyner, ltyner@ocsd.com / (714) 593-7550
Asst. General Manager: Rob Thompson, rthompson@ocsd.com / (714) 593-7310
Director of Human Resources: Celia Chandler, cchandler@ocsd.com / (714) 593-7202
Director of Engineering: Kathy Millea, kmillea@ocsd.com / (714) 593-7365
Director of Environmental Services: Lan Wiborg, lwiborg@ocsd.com / (714) 593-7450
ADMINISTRATION COMMITTEE Regular Meeting Agenda Wednesday, March 11, 2020
CALL TO ORDER
PLEDGE OF ALLEGIANCE
DECLARATION OF QUORUM:
PUBLIC COMMENTS:
If you wish to address the Committee on any item, please complete a Speaker’s Form (located at the table outside
of the Board Room) and submit it to the Clerk of the Board or notify the Clerk of the Board the item number on
which you wish to speak. Speakers will be recognized by the Chairperson and are requested to limit comments to
three minutes.
REPORTS:
The Committee Chairperson and the General Manager may present verbal reports on miscellaneous matters of
general interest to the Directors. These reports are for information only and require no action by the Directors.
CONSENT CALENDAR:
Consent Calendar Items are considered to be routine and will be enacted, by the Committee, after one motion,
without discussion. Any items withdrawn from the Consent Calendar for separate discussion will be considered in
the regular order of business.
1.2020-896APPROVAL OF MINUTES
RECOMMENDATION:
Approve Minutes of the Regular Meeting of the Administration Committee held
February 19, 2020.
Originator:Kelly Lore
Agenda Report
02-19-2020 Administration Committee Minutes
Attachments:
NON-CONSENT:
2.2020-954ORANGE COUNTY SANITATION DISTRICT ASSET MANAGEMENT
PROGRAM
RECOMMENDATION:
Receive and file the Orange County Sanitation District Asset Management Program
report.
Originator:Kathy Millea
Page 1 of 3
ADMINISTRATION COMMITTEE Regular Meeting Agenda Wednesday, March 11, 2020
Agenda Report
Final Asset Management Report
Attachments:
INFORMATION ITEMS:
3.2020-952ORANGE COUNTY SANITATION DISTRICT - ENVIRONMENTAL
SERVICES
RECOMMENDATION:
Information Item.
Originator:Lan Wiborg
Agenda ReportAttachments:
4.2020-951FY 2020-21 AND FY 2021-22 ORANGE COUNTY SANITATION
DISTRICT BUDGET REVENUE OVERVIEW
RECOMMENDATION:
Information Item.
Originator:Lorenzo Tyner
Agenda Report
FY2020-21 and 2021-22 Budget Revenue Detail
Reserve Summary - FY 2019-20
Attachments:
5.2020-953OVERVIEW OF PROPERTY - LIABILITY INSURANCE
RECOMMENDATION:
Information Item.
Originator:Lorenzo Tyner
Agenda ReportAttachments:
DEPARTMENT HEAD REPORTS:
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
At this time Directors may request staff to place an item on a future agenda.
Page 2 of 3
ADMINISTRATION COMMITTEE Regular Meeting Agenda Wednesday, March 11, 2020
ADJOURNMENT:
The next Administration Committee meeting is scheduled for Wednesday, April 8, 2020 at
5:00 p.m.
Page 3 of 3
Orange County Sanitation District
ADMINISTRATION COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2020-896 Agenda Date:3/11/2020 Agenda Item No:1.
FROM:James D. Herberg, General Manager
Originator: Kelly A. Lore, Clerk of the Board
SUBJECT:
APPROVAL OF MINUTES
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Approve Minutes of the Regular Meeting of the Administration Committee held February 19, 2020.
BACKGROUND
In accordance with the Board of Directors Rules of Procedure,an accurate record of each meeting
will be provided to the Directors for subsequent approval at the following meeting.
RELEVANT STANDARDS
·Resolution No. OCSD 19-19
ATTACHMENT
The following attachment(s)are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
·Minutes of the Administration Committee meeting held February 19, 2020
Orange County Sanitation District Printed on 3/3/2020Page 1 of 1
powered by Legistar™
Orange County Sanitation District
Minutes for the
ADMINISTRATION COMMITTEE
Wednesday, February 19, 2020
5:00 PM
Board Room
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
CALL TO ORDER
A regular meeting of the Administration Committee of the Orange County Sanitation District
was called to order by Committee Chairman Chad Wanke on February 19, 2020 at 5:03 p.m.
in the Administration Building of the Orange County Sanitation District. Director Glenn Parker
led the Flag Salute.
DECLARATION OF QUORUM:
A quorum was declared present as follows:
PRESENT:Chad Wanke, James Ferryman, Peter Kim, Mark Murphy, Steve
Nagel, Andrew Nguyen, Glenn Parker, Erik Peterson, David Shawver,
Dean Grose (Alternate) and Anthony Kuo (Alternate)
ABSENT:Cecilia Iglesias and John Withers
STAFF PRESENT:
Jim Herberg, General Manager; Rob Thompson, Assistant General Manager; Lorenzo Tyner,
Assistant General Manager; Kathy Millea, Director of Engineering; Lan Wiborg, Director of
Environmental Services; Tina Knapp, Assistant Clerk of the Board; Jeff Armstrong; Jennifer
Cabral; Rhea de Guzman; Brian Engeln; Al Garcia; Laura Maravilla; Josh Martinez; Jeff Mohr;
Paula Zeller; and Ruth Zintzun.
OTHERS PRESENT:
Brad Hogin, General Counsel and Bill Dennehy, Chandler Asset Management.
PUBLIC COMMENTS:
None.
REPORTS:
Chair Wanke indicated that, if there were no objections, Item No. 6 would be presented
before Item No. 5.
Page 1 of 5
ADMINISTRATION
COMMITTEE
Minutes February 19, 2020
CONSENT CALENDAR:
1.APPROVAL OF MINUTES 2020-885
Originator: Kelly Lore
MOVED, SECONDED, AND DULY CARRIED TO:
Approve Minutes of the Regular Meeting of the Administration Committee held
December 11, 2019.
AYES:Chad Wanke, James Ferryman, Peter Kim, Mark Murphy, Andrew
Nguyen, Glenn Parker, David Shawver and Dean Grose (Alternate)
NOES:None
ABSENT:Cecilia Iglesias, Erik Peterson and John Withers
ABSTENTIONS:Steve Nagel and Anthony Kuo (Alternate)
2.AWARD CONTRACT FOR MARINE VESSEL NERISSA ENGINE
REBUILD
2020-883
Originator: Lan Wiborg
MOVED, SECONDED, AND DULY CARRIED TO:
Approve a purchase order contract to Quinn Company to perform a rebuild on M/V
Nerissa’s Caterpillar diesel engines at a cost not to exceed $130,000.
AYES:Chad Wanke, James Ferryman, Peter Kim, Mark Murphy, Steve
Nagel, Andrew Nguyen, Glenn Parker, David Shawver, Dean Grose
(Alternate) and Anthony Kuo (Alternate)
NOES:None
ABSENT:Cecilia Iglesias, Erik Peterson and John Withers
ABSTENTIONS:None
3.GENERAL MANAGER APPROVED PURCHASES AND ADDITIONS
TO THE PRE-APPROVED OEM SOLE SOURCE LIST
2020-903
Originator: Lorenzo Tyner
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
Page 2 of 5
ADMINISTRATION
COMMITTEE
Minutes February 19, 2020
A. Receive and file Orange County Sanitation District purchases made under the
General Manager’s authority for the period of October 1, 2019 to December 31,
2019; and
B. Approve the following additions to the pre-approved OEM Sole Source List for
the period of October 1, 2019 to December 31, 2019:
·ALFA LAVAL - Parts and Repairs for Centrifuge Rotating Assembly
·CHEVRON - Chevron 5200 HDAX Low Ash 40 Lubricating Oil
·EMERSON/CALTROL - Fisher Valve Training for Instrumentation Technicians
·FLEXIM - Flow Meters
·INTERSCAN/GAS DETECTION - 2 Point H2S Monitoring Systems
·PATTERSON - Pumps and Parts
·SOLAR TURBINES - Generator Parts and Repairs
·TRANE COMPANY - Equipment, Parts, Maintenance, Repairs, and Training
·TRIDENT - Actuator Parts and Repairs
·TURVAC - Alignment Certification Training
AYES:Chad Wanke, James Ferryman, Peter Kim, Mark Murphy, Steve
Nagel, Andrew Nguyen, Glenn Parker, David Shawver, Dean Grose
(Alternate) and Anthony Kuo (Alternate)
NOES:None
ABSENT:Cecilia Iglesias, Erik Peterson and John Withers
ABSTENTIONS:None
4.MID-YEAR CONSOLIDATED FINANCIAL REPORT FOR THE PERIOD
ENDED DECEMBER 31, 2019
2019-801
Originator: Lorenzo Tyner
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
Receive and file the Orange County Sanitation District Mid-Year Financial Report for
the period ended December 31, 2019.
AYES:Chad Wanke, James Ferryman, Peter Kim, Mark Murphy, Steve
Nagel, Andrew Nguyen, Glenn Parker, David Shawver, Dean Grose
(Alternate) and Anthony Kuo (Alternate)
NOES:None
ABSENT:Cecilia Iglesias, Erik Peterson and John Withers
ABSTENTIONS:None
Director Peterson arrived at 5:05 p.m., just after the Consent Calendar vote.
Page 3 of 5
ADMINISTRATION
COMMITTEE
Minutes February 19, 2020
NON-CONSENT:
5.CONSIDERATION OF BUDGET ASSUMPTIONS AND BUDGET
CALENDAR FOR PREPARATION OF THE FISCAL YEARS 2020-21
AND 2021-22 BUDGET
2020-891
Originator: Lorenzo Tyner
Item No. 5 was heard after Item No. 6. Chair Wanke indicated that the
recommendation for this item was to be revised to indicate the action of the Committee
is to recommend approval to the Board of Directors.
Controller Wally Ritchie provided a PowerPoint presentation that reviewed budget
development assumptions, comparison of single-family residential rates, operations,
staffing, Capital Improvement Program (CIP), debt financing, budget summary, and
budget development key meeting dates.
Staff responded to a question from the Committee regarding the staff salary increases
that were incorporated into the recent Memorandums of Understanding. Chair Wanke
indicated that he will be requesting staff to research agency participation in PARS in
the near future.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors:
Approve the FY 2020-21 budget assumptions and direct staff to incorporate these
parameters in preparing the FY 2020-21 and 2021-22 budget.
AYES:Chad Wanke, James Ferryman, Peter Kim, Mark Murphy, Steve
Nagel, Andrew Nguyen, Glenn Parker, Erik Peterson, David Shawver,
Dean Grose (Alternate) and Anthony Kuo (Alternate)
NOES:None
ABSENT:Cecilia Iglesias and John Withers
ABSTENTIONS:None
INFORMATION ITEMS:
6.INVESTMENT PERFORMANCE RESULTS 2019-679
Originator: Lorenzo Tyner
Item No. 6 was presented prior to Item No. 5.
Mr. Ritchie provided a PowerPoint presentation that reviewed OCSD's seven reserve
criteria, non-discretionary criteria, discretionary reserve criteria, investment objectives,
and the investment long-term and short-term portfolios.
Page 4 of 5
ADMINISTRATION
COMMITTEE
Minutes February 19, 2020
Mr. Ritchie introduced Bill Dennehy from Chadler Asset Management who provided a
PowerPoint presentation that gave an overview of the Chandler Asset Management
firm, an economic update, and account profile.
ITEM RECEIVED AS AN:
Information Item.
DEPARTMENT HEAD REPORTS:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
Chair Wanke declared the meeting adjourned at 5:30 p.m. to the Regular meeting to be held
on Wednesday, March 11, 2020 at 5:00 p.m.
Submitted by:
_____________________
Tina Knapp, MMC
Assistant Clerk of the Board
Page 5 of 5
Orange County Sanitation District
ADMINISTRATION COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2020-954 Agenda Date:3/11/2020 Agenda Item No:2.
FROM:James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
ORANGE COUNTY SANITATION DISTRICT ASSET MANAGEMENT PROGRAM
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Receive and file the Orange County Sanitation District Asset Management Program report.
BACKGROUND
Staff will provide a presentation to both the Operations and Administration Committees on the
Orange County Sanitation District Asset Management Program.
RELEVANT STANDARDS
·Protect Orange County Sanitation District assets
·Sustain 1, 5, 20-year planning horizons
·Ensure the public’s money is wisely spent
·Maintain a proactive asset management program
·24/7/365 treatment plant reliability
ATTACHMENT
The following attachment(s)may be viewed on-line at the OCSD website (www.ocsd.com)with the complete agenda
package:
·Orange County Sanitation District Asset Management Program
EY:sa
Orange County Sanitation District Printed on 3/3/2020Page 1 of 1
powered by Legistar™
ASSET
MANAGEMENT
PLAN2019
Orange County Sanitation District, California
February 2020
i
TABLE OF CONTENTS
EXECUTIVE SUMMARY ............................................................................................................ 1
Asset Management Plan Purpose ...................................................................................... 1
Overview of OCSD’s Infrastructure ..................................................................................... 1
Asset Management Intent, Policy, and Initiatives ............................................................... 3
Asset Management Organization ........................................................................................ 4
State of OCSD’s Infrastructure ............................................................................................ 5
Budgetary Considerations ................................................................................................. 10
CHAPTER 1 PURPOSE ......................................................................................................... 11
CHAPTER 2 OVERVIEW OF OCSD’S INFRASTRUCTURE ................................................. 13
2.1 Collection System .................................................................................................... 15
2.2 Treatment Plant System .......................................................................................... 16
2.3 Outfall System ......................................................................................................... 18
2.4 Facility Valuation ..................................................................................................... 19
CHAPTER 3 ASSET MANAGEMENT INTENT, POLICY AND INITIATIVES ......................... 21
3.1 OCSD Mission and Vision Statements.................................................................... 23
3.2 Strategic Plan – Asset Management Policy and Initiatives ..................................... 24
CHAPTER 4 ASSET MANAGEMENT ORGANIZATION ........................................................ 27
4.1 Asset Management Coordination and Solutions Development .............................. 28
4.1.1 Operations and Maintenance ..................................................................... 29
4.1.2 Engineering Planning ................................................................................. 30
4.2 Maintenance and CIP Project Execution................................................................. 31
4.2.1 Project Management Office ........................................................................ 31
4.2.2 Design ........................................................................................................ 32
4.2.3 Construction Management ......................................................................... 32
4.3 Asset Maintenance .................................................................................................. 32
4.3.1 Maintenance ............................................................................................... 33
CHAPTER 5 STATE OF OCSD’S INFRASTRUCTURE ......................................................... 37
5.1 System Summaries ................................................................................................. 38
5.2 Area Asset Management Summaries ..................................................................... 43
5.2.1 Plant No. 1 Asset Management Summaries .............................................. 45
5.2.2 Plant No. 2 Asset Management Summaries .............................................. 71
5.2.3 Collection System Pump Station Asset Management Summaries ............ 97
5.2.4 Collection System Pipeline Asset Management Summaries ................... 107
CHAPTER 6 PROGRAM MONITORING AND IMPROVEMENTS ........................................ 131
6.1 Program Monitoring ............................................................................................... 131
6.2 AM Program Improvement Opportunities.............................................................. 131
CHAPTER 7 BUDGETARY CONSIDERATIONS ................................................................. 133
7.1 Capital Improvement Expenditures ....................................................................... 133
7.2 Maintenance Expenditures .................................................................................... 135
7.2.1 Five-Year Historical Maintenance Expenditures ...................................... 135
7.2.2 Three-Year Look-Ahead Maintenance Expenditures ............................... 136
ii
LIST OF FIGURES
Figure ES.1. Facility Valuation by Location .................................................................................................. 2
Figure ES.2. Roles in Asset Management .................................................................................................... 4
Figure ES.3. 20-Year CIP Outlay ................................................................................................................ 10
Figure 2.1. OCSD Service Area .................................................................................................................. 14
Figure 2.2. Aerial View of Reclamation Plant No. 1 .................................................................................... 16
Figure 2.3. Aerial View of Treatment Plant No. 2........................................................................................ 17
Figure 2.4. Facility Valuation by Area ......................................................................................................... 19
Figure 2.5. Facility Valuation by Area ......................................................................................................... 20
Figure 4.1. Roles in Asset Management ..................................................................................................... 27
Figure 4.2. Coordination and Solutions Development Processes .............................................................. 29
Figure 4.3. CCTV Inspection ....................................................................................................................... 30
Figure 4.4. Asset Engineer Role within Asset Management ....................................................................... 31
Figure 4.5. PdM Summary .......................................................................................................................... 33
Figure 4.6. Vibration Analysis Equipment ................................................................................................... 34
Figure 4.7. Infrared Thermography ............................................................................................................. 34
Figure 5.1. Area Asset Management Summary Structure .......................................................................... 44
Figure 7.1. 20-Year CIP Outlay ................................................................................................................. 133
Figure 7.2 CIP Outlay by Process ............................................................................................................. 134
Figure 7.3. Five-Year Historical Maintenance Costs for Treatment Plants ............................................... 135
Figure 7.4. Five-Year Historical Maintenance Costs for Collection System ............................................. 135
LIST OF TABLES
Table ES.1. Plant No. 1 Overview ................................................................................................................ 6
Table ES.2. Plant No. 2 Overview ................................................................................................................ 7
Table ES.3. Collection System – Pump Station Overview ............................................................................ 8
Table ES.4. Collection System – Pipeline Overview .................................................................................... 9
Table 3.1. Linkage between Asset Management Plan and Other Planning Activities ................................ 22
Table 4.1. High-level Summary of OCSD’s PdM Program ......................................................................... 33
Table 5.1. Asset Registry Fields ................................................................................................................. 37
Table 6.1. AM Program Improvement Opportunities ................................................................................ 131
Table 7.1. Planned Operational-Funded Maintenance Projects in Fiscal Years 2019/20 through
2021/22 ........................................................................................................................................ 136
iii
ACRONYMS AND ABBREVIATIONS
Acronym or
Abbreviation
Meaning
AM Asset Management
AMP Asset Management Plan
AS1 Activated Sludge 1
AS2 Activated Sludge 2
BB Blower Building
CCTV Closed-circuit Television
CenGen Central Generation
CIP Capital Improvement Program
CP-DIG-LEL Control Panel - Digesters - Lower Explosive Limit
DAF Dissolved Air Flotation
DAFT Dissolved Air Flotation Thickener
DC Distribution Center
DCJ Distribution Center J
EBDB East Basin Distribution Box
EJB Effluent Junction Box
Elec. Electrical
EPSA Effluent Pump Station Annex
FE Facilities Engineering
FeCl3 Ferric chloride
FY Fiscal Year
GWRS Groundwater Replenishment System
HCl Hydrochloric Acid
HDPE High-Density Polyethylene Resin
HP Horsepower
HVAC Heating, Ventilation, and Air Conditioning
HW Headworks
I&C Instrumentation and Controls
IA Instrument Air
Inst. Instrument
JB Junction Box
kV Kilovolt
kW Kilowatt
LEL Lower Explosive Limit
LOS Level of Service
LOX Liquid Oxygen
M&D Metering & Diversion
MCC Motor Control Center
MGD Million Gallons Per Day
iv
Acronym or
Abbreviation
Meaning
MH Manhole
ML Mixed Liquor
MP Maintenance Project
MSP Main Sewage Pump
N/A Not applicable
NaOH Sodium Hydroxide
NASSCO National Association of Sewer Service Companies
NFPA National Fire Protection Association
No. Number
NPDES National Pollutant Discharge Elimination System
NSC North Scrubber Complex
O&M Operations and Maintenance
OCFCD Orange County Flood Control District
OCSD Orange County Sanitation District
OCWD Orange County Water District
OEM Original Equipment Manufacturer
OOBS Ocean Outfall Booster Station
OXI Oxidizer
P1 Plant No. 1
P2 Plant No. 2
PB Power Building
PB Primary Basin
PdM Mature Predictive Maintenance
PDU Power Distribution Unit
PE Primary Effluent
PEDB Primary Effluent Distribution Box
PEJB Primary Effluent Junction Box
PEPS Primary Effluent Pump Station
PISB Primary Influent Splitter Box
PLC Programmable Logic Controller
PM Preventive Maintenance
PRN Project Request Number
PS Pump Station
PVC Polyvinyl chloride
PWPS Plant Water Pump Station
RAS Return Activated Sludge
RCP Reinforced Concrete Pipe
Recir. Recirculation
RSS Return Secondary Sludge
v
Acronym or
Abbreviation
Meaning
RUL Remaining Useful Life
RWQCB Regional Water Quality Control Board
SALS Steve Anderson Lift Station
SC Secondary Clarifier
SCADA Supervisory Control and Data Acquisition
SCR Selective Catalytic Reduction
SE Secondary Effluent
SEJB Secondary Effluent Junction Box
SR Secondary Return
SSC South Scrubber Complex
T&D Thickening & Dewatering
TF Trickling Filter
TFPS Trickling Filter Pump Station
TFSE Trickling Filter Secondary Effluent
TL Trunkline
TPAD Temperature-phased Anaerobic Digester
UPS Uninterruptible Power Supply
V Voltage
VDC Volts Direct Current
VFD Variable Frequency Drive
WAS Waste Activated Sludge
WSS Waste Sidestream, Waste Secondary Sludge
WSSPS Waste Sidestream Pump Station
Yr Year
vi
This page is intentionally left blank
1
EXECUTIVE SUMMARY
Asset Management Plan Purpose
Over the past two years, Orange County Sanitation District (OCSD) has made a concerted effort
to establish an updated and more robust understanding of the condition and performance of all
critical and major assets and our ability to meet established levels of service. As OCSD
embarks on another year of this renewed asset management program, we have updated our
Asset Management Plan to be a tactical document summarizing our plans for addressing asset
condition and performance issues.
This Asset Management Plan will be published annually, and we anticipate this document will
continue to change in content and structure as our asset management program evolves.
Overview of OCSD’s Infrastructure
OCSD is responsible for providing wastewater collection, treatment and recycling services to
over 2.6 million people in central and northern Orange County, California. OCSD’s two resource
recovery and wastewater treatment facilities treat an average daily wastewater flow of 185
million gallons per day (MGD) from residential, commercial and industrial sources.
OCSD owns and operates wastewater collection system infrastructure as well as resource
recovery and wastewater treatment facilities. Our collection system infrastructure includes 389
miles of regional trunk sewer pipelines and fifteen pump stations located throughout OCSD’s
service area. This wastewater is conveyed to Reclamation Plant No. 1 in Fountain Valley and
Treatment Plant No. 2 in Huntington Beach, where resource recovery and wastewater treatment
take place.
2
Figure ES.1 shows the facility valuation by asset system for OCSD’s wastewater infrastructure.
The valuation was prepared as part of the 2017 Facilities Master Plan.
Figure ES.1. Facility Valuation by Location
Collection
System
Piping,
$3.23, 30.1%
Collection
System
Pump
Stations,
$0.33, 3.1%
Plant No. 1
Facilities,
$2.77, 25.8%
Plant No. 2
Facilities,
$2.86, 26.6%
Interplant
Joint and
Common
Facilities,
$1.55, 14.4%
Facility Valuation
(in $billions, 2017 dollars)
$10.73Total Valuation:
3
Asset Management Intent, Policy, and Initiatives
Reliable infrastructure is essential to achieving our mission and vision. We manage
infrastructure reliability according to the following stated intent for our asset management
program:
“OCSD will know the condition of assets we own and will have a
plan to operate and maintain these assets to deliver the required
level of service at the lowest life cycle cost with an acceptable
level of risk.”
~ James D. Herberg, OCSD General Manager
In November 2019, OCSD’s strategic planning process resulted in the creation of an Asset
Management Policy and Asset Management Initiatives.
ASSET MANAGEMENT POLICY
The Sanitation District will assess and manage the collection system and treatment plant
systems and assets to improve resilience and reliability while lowering lifecycle costs. This will
be accomplished through adaptive operation, coordinated maintenance and condition
assessment, and planned capital investment. Staff will balance maintenance, refurbishment,
and replacement strategies to maximize useful life, system availability and efficiency.
ASSET MANAGEMENT INITIATIVES
Create an annual Asset Management Plan documenting the condition of the collection
system and treatment plants, and upcoming maintenance or capital projects.
Coordinate the efforts of operations, collections, mechanical maintenance, electrical
maintenance, instrument maintenance and engineering through process teams to assure
the Sanitation District’s resources are focused on the high priority work functions.
Maintain a 20-year forecast of all CIP projects needed to maintain or upgrade the
Sanitation District’s nearly $11 billion in assets on a prioritized risk basis to establish rate
structures.
4
Asset Management Organization
Asset management is not new to OCSD. As shown in Figure ES.2, every part of our
organization is involved in some aspect of ensuring assets are designed, constructed, operated,
and maintained to reliably deliver service to our customers.
Figure ES.2. Roles in Asset Management
To fulfill our commitment to our ratepayers for providing safe and reliable services, OCSD has
augmented and solidified our asset management program and restructured the organization to
better align the Engineering and Operations and Maintenance (O&M) departments. Through this
restructuring, OCSD has established an Asset Management Group within the Planning Division
consisting of nine Asset Engineers responsible for understanding the key issues or concerns
related to the condition of OCSD’s assets and for developing and coordinating plans to ensure
these assets operate reliably.
5
State of OCSD’s Infrastructure
The following system-level summary tables provide a high-level overview of the Area Asset
Management Summaries contained in CHAPTER 5. The system-level summaries are organized
by:
Plant No. 1 (Table ES.1)
Plant No. 2 (Table ES.2)
Collection System – Pump Stations (Table ES.3)
Collection – Pipelines (Table ES.4)
The system-level summaries generally include the following fields:
Area No.
Area Name
Average Remaining Useful Life (RUL) Score: Estimated average RUL score for each
discipline (civil, structural, mechanical, electrical, and instrumentation) or area based on
an average of the RUL scores provided by Asset Engineers in the detailed Area AM
Summaries.
Percentage of RUL Scores with 4s or 5s[1]: Percentage based on total number of RUL
scores assigned to each area by Asset Engineers in the detailed Area AM Summaries.
The percentage is an alternate metric for the overall condition of the area. A RUL score
of 5 indicates less than 5 years of useful life remains for an asset or set of assets. A RUL
score of 4 indicates 5 to 10 years of useful life remains for an asset or a set of assets.
Replacement Value ($million): Process area replacement value from the facility
valuation.
[1]RUL 5: <5 Years, RUL 4: 5 to 10 Years
6
Table ES.1. Plant No. 1 Overview
Ar
e
a
N
o
.
Area Name
Average Remaining Useful Life Score
Pe
r
c
e
n
t
a
g
e
of
RU
L
Sc
o
r
e
s
w
i
th
4s
o
r
5
s
Nu
m
b
e
r
o
f
P
r
o
j
e
c
t
s
to
A
d
d
r
e
s
s
4
s
&
5
s
Replacement
Value
($millions,
in 2017 Dollars)
Ci
v
i
l
St
r
u
c
t
u
r
a
l
Me
c
h
a
n
i
c
a
l
El
e
c
t
r
i
c
a
l
In
s
t
r
u
m
e
n
t
a
t
i
o
n
Al
l
As
s
e
t
s
10 Preliminary Treatment 1 2 4 4 4 4 56% 4 $351.2
11 Primary Treatment 3 2 4 3 3 3 31% 8 $451.6
12 Secondary Treatment -
Activated Sludge 3 2 3 3 4 3 32% 11 $887.3
12 Secondary Treatment -
Trickling Filter 1 1 3 4 3 2 10% 6 $61.6
14 Interplant 2 2 3 2 1 2 17% 4 $683.1
15 Solids Handling - Digesters 2 1 2 2 2 2 3% 7 $231.2
15 Solids Handling - Facilities 2 1 2 2 2 2 9% 6 $206.5
16 Central Generationa 3 4 4 4 4 50% 12 $154.8
17 Utilities 3 2 3 2 1 2 8% 11 $176.2
18 Electrical Distributiona 3 3 48% 10 $74.1
19 Miscellaneous Structures &
Grounds To Be Determined TBD TBD TBD $220.0
Plant No. 1 Total 30% 79 $3,497.7
a Gray box with diagonal line indicates there are no assets assigned to this discipline within this process area.
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
7
Table ES.2. Plant No. 2 Overview
a Gray box with diagonal line indicates there are no assets assigned to this discipline within this process area.
Ar
e
a
N
o
.
Area Name
Average Remaining Useful Life Score
Pe
r
c
e
n
t
a
g
e
of
RU
L
Sc
o
r
e
s
w
i
t
h
4s
o
r
5
s
Nu
m
b
e
r
o
f
P
r
o
j
e
c
t
s
t
o
Ad
d
r
e
s
s
4
s
&
5
s
Replacement
Value
($millions,
in 2017 Dollars)
Ci
v
i
l
St
r
u
c
t
u
r
a
l
Me
c
h
a
n
i
c
a
l
El
e
c
t
r
i
c
a
l
In
s
t
r
u
m
e
n
t
a
t
i
o
n
Al
l
As
s
e
t
s
20 Preliminary Treatment 3 1 2 2 2 2 2% 11 $324.6
21 Primary Treatment 3 2 3 3 3 3 9% 7 $454.3
22 Secondary Treatment -
Activated Sludge 3 2 3 3 3 3 17% 8 $608.5
22 Secondary Treatment -
Trickling Filter 2 1 2 3 3 2 1% 7 $310.8
24 Effluent Disposal 2 2 2 3 3 2 12% 10 $817.1
25 Solids Handling - Digesters 3 3 3 4 4 3 45% 12 $322.7
25 Solids Handling - Facilities 2 2 2 2 2 2 16% 7 $201.5
26 Central Generationa 3 4 4 4 4 71% 13 $330.2
27 Utilities 2 3 3 2 1 2 5% 9 $98.3
28 Electrical Distributiona 3 3 57% 11 $72.7
29 Miscellaneous Buildings &
Grounds To Be Determined TBD TBD TBD $132.7
Plant No. 2 Total 29% 95 $3,673.4
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
8
Table ES.3. Collection System – Pump Station Overview
Pump Station
Average Remaining Useful Life Score
Pe
r
c
e
n
t
a
g
e
o
f
RU
L
Sc
o
r
e
s
w
i
t
h
4s
o
r
5
s
Nu
m
b
e
r
o
f
P
r
o
j
e
c
t
s
to
Ad
d
r
e
s
s
4
s
&
5
s
Replacement
Value
($millions,
in 2017 Dollars)
Ci
v
i
l
Str
u
c
t
u
r
a
l
Me
c
h
a
n
i
c
a
l
El
e
c
t
r
i
c
a
l
In
s
t
r
u
m
e
n
t
a
t
i
o
n
Al
l
As
s
e
t
s
15th Street 3 4 3 2 3 3 17% 2 $13.5
A Street 3 4 3 3 2 3 17% 1 $11.7
Bay Bridge 4 4 4 4 4 4 85% 3 $34.0
Bitter Point 2 3 2 1 2 2 15% 1 $32.2
College Avenue 3 2 3 2 1 2 8% 2 $24.0
Crystal Cove 3 3 4 3 2 3 17% 2 $2.5
Edinger 4 3 3 3 3 3 27% 4 $12.9
Lido 1 4 4 3 3 3 42% 5 $20.1
MacArthur 4 3 4 3 1 3 36% 3 $16.3
Main Street 4 3 4 2 2 3 38% 3 $44.0
Rocky Point 1 3 3 2 2 2 15% 2 $16.0
Seal Beach 3 4 5 5 3 4 75% 3 $41.5
Slater 4 4 4 3 2 3 38% 4 $35.2
Westside 3 3 3 2 3 3 0% 1 $30.6
Yorba Linda 3 4 4 3 2 3 27% 1 Not Valued
Total 31% 37+13a $334.6
a 37 projects affect only one pump station. An additional 13 projects affect multiple pump stations.
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
9
Table ES.4. Collection System – Pipeline Overview
Trunk
Miles of
Pipe with
Grade 4
Defectsa
Miles of
Pipe with
Grade 5
Defectsa
Total Miles
with
Grade 4 or
Grade 5
Defectsa
Total
Miles
Percent
of Length
with Non-
Isolated 4s
or 5s
Replacement
Value
($millions,
in 2017
Dollars)
Baker-Main 0.18 0.12 0.30 42.6 0.7% $275.5
Bushard - - - 21.4 - $241.6
Coast Hwy - - - 11.4 - $98.5
Euclid - - - 34.4 - $269.9
Interplant - - - 16.9 - $115.3
Knott 0.44 2.04 2.48 73.2 3.4% $625.0
Miller-Holder 0.23 - 0.23 31.5 0.7% $296.1
Newhope-Placentia 0.11 0.04 0.15 30.9 0.5% $209.0
Newport 0.10 - 0.10 31.5 0.3% $216.3
SARI 0.25 - 0.25 50.3 0.5% $516.1
Sunflower 0.39 0.23 0.62 34.8 1.8% $299.9
Talbert - - - 8.4 - $57.6
Total 1.70 2.43 4.13 387.4 1.1% $3,220.8
a Grade 4 and 5 defects include both isolated (i.e., pipes that can be fixed by point repair) and non-isolated (i.e., pipes that need
rehabilitation or replacement) type pipe.
b The abandoned pipelines at the Airbase ($6,366,516) and the Harvard Area Trunk Sewer ($191,784) areas are not included in
the replacement value total.
10
Budgetary Considerations
The AMP focuses on documenting short- to long-term planning of maintenance and capital
improvement projects to support effective budget development and sustainable operations.
OCSD has been striving to more accurately identify medium- to long-term capital cash flow
requirements.
Fiscal Year 2019-2020 Budget Update, adopted on June 26, 2019, includes updates to the
20-year CIP outlay. Figure ES.3 includes current and projected Capital Improvement Program
projects.
Figure ES.3. 20-Year CIP Outlay
$ mi
l
l
i
o
n
s
20-Year CIP Outlay
11
CHAPTER 1 PURPOSE
Over the past two years, the Orange County Sanitation District (OCSD) has made a concerted
effort to establish a baseline understanding of the condition and performance of all critical and
major assets and our ability to meet established levels of service. As OCSD embarks on
another year of this renewed asset management program, we have updated our Asset
Management Plan to be a tactical document summarizing our plans for addressing asset
condition and performance issues.
This Asset Management Plan will be published annually, and we anticipate this document will
continue to change in content and structure as our asset management program evolves. The
current structure is organized into the following chapters to meet the needs of stakeholders:
Executive Summary: Summarizes purpose of the Asset Management Plan and main
conclusions.
Chapter 1 Purpose: Outlines purpose and organization of the Asset Management Plan.
Chapter 2 Overview of OCSD’s Infrastructure: Describes the major infrastructure that
OCSD owns and operates.
Chapter 3 Asset Management Intent, Policy and Initiatives: Defines organizational
intents, policies, and initiatives driving the asset management program.
Chapter 4 Asset Management Organization: Describes the asset management
organizational structure and asset management strategies.
Chapter 5 State of OCSD’s Infrastructure: Summarizes the current state of OCSD’s
infrastructure and plans to address asset condition and performance issues.
Chapter 6 Program Monitoring and Improvements: Documents activities to monitor
the asset management program and improvement opportunities.
Chapter 7 Budgetary Considerations: Summarizes CIP and maintenance
expenditures, and planned maintenance projects.
12
This page is intentionally left blank.
13
CHAPTER 2 OVERVIEW OF OCSD’S INFRASTRUCTURE
OCSD is responsible for providing wastewater collection, treatment and recycling services to
over 2.6 million people in central and northern Orange County, California. OCSD’s two resource
recovery and wastewater treatment facilities treat an average daily wastewater flow of 185
million gallons per day (MGD) from residential, commercial and industrial sources.
OCSD owns and operates wastewater collection system infrastructure as well as resource
recovery and wastewater treatment facilities. Our collection system infrastructure includes 389
miles of regional trunk sewer pipelines and fifteen pump stations located throughout OCSD’s
service area (shown in Figure 2.1). This wastewater is conveyed to Reclamation Plant No. 1 in
Fountain Valley and Treatment Plant No. 2 in Huntington Beach, where resource recovery and
wastewater treatment take place.
OCSD’s treatment plants currently operate under a permit from the Regional Water Quality
Control Board (RWQCB). This was established by the National Pollutant Discharge Elimination
System (NPDES) that permits the discharge of treated wastewater through an ocean outfall
system to the Pacific Ocean. While some of this treated water is released five miles offshore
through a deep-water ocean outfall system, most is recovered and delivered to Orange County
Water District (OCWD). OCWD further treats OCSD’s effluent using the Groundwater
Replenishment System, which improves the effluent water quality to drinking water standards
for groundwater recharge and irrigation purposes. The following sections briefly describe the
key systems under OCSD’s management.
14
Figure 2.1. OCSD Service Area
15
2.1 Collection System
OCSD’s collection system serves as a regional conveyance system, collecting and conveying
flows from 20 cities and four special districts. OCSD's 389 miles of collection system pipelines
and 15 pump stations are spread throughout northern Orange County and include 365 miles of
gravity pipelines, 20 miles of force mains, four miles of inverted siphons and 4,471 manholes
structures.
16
2.2 Treatment Plant System
OCSD owns and operates two wastewater treatment plants. Reclamation Plant No. 1 is
located in the City of Fountain Valley, approximately four miles inland of the Pacific Ocean and
adjacent to the Santa Ana River (shown in Figure 2.2). Influent wastewater entering
Reclamation Plant No. 1 passes through a flow metering and diversion structure, mechanical
bar screens, grit chambers, and primary basins, before going to one of two air activated sludge
processes or trickling filters and secondary basins. Up to 135 MGD of secondary effluent can be
diverted to OCWD’s facilities for tertiary treatment prior to reuse.
Figure 2.2. Aerial View of Reclamation Plant No. 1
Solids treatment at Reclamation Plant No.1 includes co-thickening of primary and secondary
sludge, followed by anaerobic digestion process and centrifuge dewatering of digested sludge to
produce Class-B biosolids. Digester gas produced at Plant No. 1 is collected, compressed,
cleaned, and transferred to the Central Power Generation Facility as a renewable fuel for
energy generation. Plant No. 1 also has facilities for odor control and chemical addition.
17
Treatment Plant No. 2 is located in the City of Huntington Beach, adjacent to the Santa
Ana River and east of Pacific Coast Highway (shown in Figure 2.3). Raw sewage flow entering
Treatment Plant No. 2 passes through a flow metering structure, mechanical bar screens and
grit removal chambers. Flow then passes through primary basins before being split between the
oxygen activated sludge secondary treatment facility or trickling filters/solids contact and is
discharged directly to the ocean via the outfall pumping system.
Figure 2.3. Aerial View of Treatment Plant No. 2
Solids treatment at Treatment Plant No. 2 includes in-basin thickening of primary sludge,
dissolved air flotation thickening of waste activated sludge and secondary sludge, anaerobic
sludge digestion and centrifuge dewatering. Plant No. 2 also has facilities for odor control and
chemical addition. Digester gas produced at Plant No. 2 is collected, compressed, cleaned, and
distributed to a Central Power Generation System as a renewable fuel for energy generation.
18
2.3 Outfall System
The ocean outfall system includes three discharge structures: Outfall No. 1, Outfall No. 2, and
the Santa Ana River Emergency Overflow Weirs.
Outfall No. 2 serves as the primary ocean outfall, discharging treated wastewater
approximately five miles offshore at a depth of approximately 200 feet. It began service in 1971.
Outfall No. 1 serves as an emergency outfall. It was originally constructed in 1954 and
modified in 1965. It is located over a mile offshore at a depth of approximately 65 feet. OCSD’s
NPDES permit specifies that this outfall can only be used in the case of an emergency or
maintenance.
The Outfall System has two Santa Ana River Emergency Overflow Weirs at Plant No. 2
which discharge directly to the Santa Ana River. These weirs are for extreme emergency use
only.
19
2.4 Facility Valuation
As part of the 2017 Facilities Master Plan, OCSD commissioned consulting engineering firms to
conduct a study to determine the 2017 value of all OCSD capital facilities, including
Reclamation Plant No. 1, Treatment Plant No. 2, interplant and joint treatment facilities, and the
collection system, including sewer pipelines and lift stations.
Figure 2.4 shows the valuation information presented in five general sub-process areas:
Collections Systems Piping
Collection Systems Pump Stations
Plant No. 1 Facilities
Plant No. 2 Facilities
Interplant and Joint Treatment Facilities
Figure 2.4. Facility Valuation by Area
Collection
System
Piping,
$3.23, 30.1%
Collection
System
Pump
Stations,
$0.33, 3.1%
Plant No. 1
Facilities,
$2.77, 25.8%
Plant No. 2
Facilities,
$2.86, 26.6%
Interplant
Joint and
Common
Facilities,
$1.55, 14.4%
Facility Valuation
(in $billions, 2017 dollars)
$10.73Total Valuation:
20
Figure 2.5 shows the valuation information presented by area designation.
Figure 2.5. Facility Valuation by Area
21
CHAPTER 3 ASSET MANAGEMENT INTENT, POLICY AND
INITIATIVES
The Asset Management Plan is prepared in alignment with OCSD’s Mission, Vision, Asset
Management Policy and Asset Management Initiatives approved by our Board of Directors.
OCSD’s Asset Management Initiatives serve as a means for tracking progress towards meeting
asset management objectives along with other performance measures.
22
This Asset Management Plan is a key component of OCSD’s overall planning activities. It is
aligned with the District’s Strategic Plan, includes projects identified in the Facilities Master
Plan, and identifies potential new activities requiring funding in the budget development
process. Table 3.1 describes the relationship of the Asset Management Plan to other planning
activities.
Table 3.1. Linkage between Asset Management Plan and Other Planning Activities
Planning
Activity Description Planning
Horizon Update Cycle
Strategic
Plan
Defines the strategic initiatives to be
pursued by OCSD and provides a basis
for long-term financial, capital, and
operating planning. The Asset
Management Plan aligns with Strategic
Plan goals and objectives.
5- to 10-year Biennial
Facilities
Master Plan
Identifies long-term capital improvement
plans to address treatment and collection
system infrastructure needs. Projects
identified in the Facilities Master Plan are
incorporated into the Asset Management
Plan and refined as appropriate.
20-year Varies
Asset
Management
Plan
Documents the overall condition of
treatment and collection system assets
and plans to address key condition and
performance issues to ensure assets meet
OCSD’s levels of service.
1-year
5-year
10-year
Annual
Budget
Document
Lays out the framework of OCSD’s
activities and serves as a source of
information for our Board of Directors,
ratepayers and employees. Includes
operational, capital and debt service
expenditures necessary to support our
mission and execute the Strategic Plan
adopted by our Board of Directors. The
Asset Management Plan identifies new
maintenance and capital improvement
activities for consideration in the budget
development process.
2-year Annual
23
3.1 OCSD Mission and Vision Statements
OCSD’s Board of Directors developed Mission and Vision statements to clearly communicate
OCSD’s purpose to our stakeholders and to articulate OCSD’s organizational objectives.
OCSD’s Vision supports our Mission by expressing what we strive to achieve now and into the
future.
OUR MISSION
To protect public health and the environment by providing effective wastewater
collection, treatment and recycling services.
OUR VISION
OCSD will be a leader in:
Providing reliable, responsive, and affordable services in line with customer
needs and expectations.
Protecting public health and the environment utilizing all practical and effective
means for wastewater, energy, and solids resource recovery.
Continually seeking efficiencies to ensure that the public’s money is well
spent.
Communicating our mission and strategies with those we serve and all other
stakeholders.
Partnering with others to benefit our customers, this region, and our industry.
Creating the best possible workforce in terms of safety, productivity, customer
service, and training.
We are achieving this mission through improved asset management practices to better
coordinate and plan actions to ensure our collection system, treatment and resource recovery
infrastructure works when we need it.
One of the ways we are doing this in asset management is by defining clear roles and
responsibilities for identifying the condition and performance needs of our assets. We work as a
team to develop solutions and coordinate our efforts to solve these issues before they become
problems that impact our ability to achieve our mission. This Asset Management Plan
documents the key condition and performance issues identified by OCSD staff and our
collective plans for addressing these issues.
24
3.2 Strategic Plan – Asset Management Policy and Initiatives
Reliable infrastructure is essential to achieving our mission and vision. The stated intent of
OCSD’s General Manager is:
“OCSD will know the condition of assets we own and will have a plan to
operate and maintain these assets to deliver the required level of service at
the lowest life cycle cost with an acceptable level of risk.”
– James D. Herberg, OCSD General Manager
Related to the intent, the key objectives we are building into the asset management program
include:
Proactive approach to repair, rehabilitation and replacement.
Ensure assets are reliable and operating when needed.
Minimize unplanned outages and equipment downtime.
Manage risks associated with asset or service impairment through asset performance
optimization.
Develop cost-effective management strategies for the long term.
Strive to implement world class asset management strategies through continual
improvement in our asset management practices.
In addition, OCSD has a biennial strategic planning process designed to accomplish the
following objectives:
Affirm corporate mission and vision.
Adjust strategic goals and policies.
Set agency-wide prioritization of initiatives.
Provide a disciplined budgeting process.
Set operational goals at the operating level.
Hold individual units accountable for performance.
25
The biennial strategic planning process is instrumental to aligning the activities OCSD’s staff
performs with the strategic intent of the Board of Directors. In November 2019, OCSD’s
strategic planning process resulted in the creation of an Asset Management Policy and Asset
Management Initiatives.
ASSET MANAGEMENT POLICY
The Sanitation District will assess and manage the collection system and treatment plant
systems and assets to improve resilience and reliability while lowering lifecycle costs. This
will be accomplished through adaptive operation, coordinated maintenance and condition
assessment, and planned capital investment. Staff will balance maintenance, refurbishment,
and replacement strategies to maximize useful life, system availability and efficiency.
ASSET MANAGEMENT INITIATIVES
Create an annual Asset Management Plan documenting the condition of the collection
system and treatment plants, and upcoming maintenance or capital projects.
Coordinate the efforts of operations, collections, mechanical maintenance, electrical
maintenance, instrument maintenance and engineering through process teams to assure
the Sanitation District’s resources are focused on the high priority work functions.
Maintain a 20-year forecast of all CIP projects needed to maintain or upgrade the
Sanitation District’s nearly $11 billion in assets on a prioritized risk basis to establish rate
structures.
Continual improvement in asset management practices is important. We are actively working to
improve our implementation of the key objectives and our asset management capabilities,
processes and systems through improved coordination in needs identification, solutions
development, and project execution.
This Asset Management Plan provides a summary of the condition of the collection system and
treatment plants in CHAPTER 5 along with the upcoming maintenance and capital projects.
CHAPTER 4 describes our approach to coordinating and focusing our efforts on high priority
work functions.
26
This page is intentionally left blank.
27
CHAPTER 4 ASSET MANAGEMENT ORGANIZATION
Asset management is not new to OCSD. Every part of our organization is involved in some
aspect of ensuring assets are designed, constructed, operated, and maintained to reliably
deliver service to our customers.
Figure 4.1. Roles in Asset Management
Operations operates assets to convey, treat and recover resources.
Maintenance performs activities to maintain asset reliability.
Engineering Planning provides engineering support for short- to long-term
management of assets.
Project Management manages design and construction of new facilities and the
rehabilitation of older facilities.
Engineering Design ensures projects and assets are designed to meet stakeholder
needs.
Construction Management ensures assets are constructed in accordance with contract
requirements.
To fulfill our commitment to our ratepayers for providing safe and reliable services, OCSD has
augmented and solidified our asset management program and restructured the organization to
better align the Engineering and Operations and Maintenance (O&M) departments. Through this
restructuring, OCSD has established an Asset Management Group within the Planning Division
consisting of nine Asset Engineers responsible for understanding the key issues or concerns
related to the condition of OCSD’s assets and for developing and coordinating plans to ensure
these assets operate reliably. The Asset Engineers work closely with O&M Area Team
28
members to maintain familiarity with operational, condition, and maintenance issues within their
assigned areas.
4.1 Asset Management Coordination and Solutions Development
The Area Teams are the starting point for leveraging field data to define issues requiring
remediation. Area Teams are made up of plant operators, mechanics, electricians, instrument
technicians and Asset Engineers. Figure 4.2 shows how field data is used to support
coordination and solutions development for reporting issues to management and gaining project
approval.
Coordination: Asset Engineers coordinate with O&M staff to understand asset
conditions and needs based on staff knowledge, condition assessments (e.g., closed-
circuit television [CCTV], corrosion assessments) and predictive maintenance data
(e.g., vibration, infrared, oil quality). Asset Engineers update the area asset registries
with estimated remaining useful life and relevant notes. Asset Engineers compile key
issues and coordinate potential remediation activities, which are then presented to the
Asset Management Council, consists of managers from all divisions within OCSD, during
monthly presentations.
Solutions: Asset Engineers support solutions development and tracking. OCSD has
developed SharePoint sites to track asset issues (i.e., Asset Issues Tracker) and to track
solutions to asset issues executed by other divisions. Asset Engineers also define and
prepare the potential work packages for the Clearinghouse review and approval. The
Clearinghouse consists of managers from all OCSD divisions who come to a common
understanding of issues facing OCSD and prioritize resources necessary to address
those issues. After the project is approved by the Clearinghouse, it is turned over to a
project team for execution.
There are two sources of funding that may be used for projects approved by the Clearinghouse:
Operating Budget and Capital Improvement Program.
The two-year Operating Budget is adopted biennially with an annual update. This budget
includes funding for all programmed maintenance work and repairs to the facilities and
infrastructure.
The Capital Improvement Program sets aside funds for projects that are planned to
rehabilitate, replace, or extend the useful life of the facilities and infrastructure.
29
Figure 4.2. Coordination and Solutions Development Processes
The following subsections describe the groups involved in the coordination and solutions
development process of asset management.
4.1.1 Operations and Maintenance
Area Teams
The O&M Department has created Area Teams assigned to various process areas within the
two wastewater treatment plants with the vision of being a top-notch, high-performing team that
increases process efficiency and asset availability.
The Area Teams consist of staff from operations and maintenance covering mechanical,
instrumentation and electrical disciplines. Each Area Team is assigned an Area Champion
(typically a supervisor) who assists the team through challenges, and aids in team collaboration
and oversight. The Area Team is also assigned representatives from maintenance planning and
an Asset Engineer from the Planning Asset Management Group (see Subsection 4.1.2).
The teams help streamline efforts and align resources within the current organizational structure
to integrate the skills, knowledge and insights from all levels of operations, maintenance and
engineering. O&M Area Team members provide the Asset Engineer with a direct line of
30
communication to field staff operating within the process areas and serve as a central resource
for information sharing and collaboration for solution development.
4.1.2 Engineering Planning
OCSD’s Planning Division provides a comprehensive Capital Improvement Program (CIP) that
considers projected capacity requirements, condition of current assets, projected regulatory,
level of service changes and business opportunities.
Capital Improvement Program Planning
The Planning Division’s CIP Planning Group develops and maintains the 20-year CIP plan
consisting of capital improvement projects that maintain reliability, accommodate future growth,
as well as meet future regulatory requirements, level of service goals, and strategic initiatives.
In 2017, the OCSD Board of Directors adopted the Facilities Master Plan which provides a 20-
year roadmap setting forth OCSD’s long term Capital Improvement Program. This roadmap
provides a framework for infrastructure improvements needed at our treatment plant facilities,
15 pump stations, and 389 miles of regional sewers. In the 2017 Facilities Master Plan, most of
the projects identified are the result of the need to rehabilitate and replace aging infrastructure in
the collection system and treatment plants.
Asset Management
The Asset Management Group within the Planning Division consists of nine Asset Engineers
who are responsible for OCSD’s short- to long-term asset management goals. The primary
responsibility of this group is to monitor the condition of assets, develop short to long-term
planning for asset maintenance, rehabilitation and replacement, and identification, packaging
and prioritization of maintenance and CIP projects.
Asset Engineers are assigned to one or more defined process or collection system areas. They
work closely with O&M to maintain familiarity with operational, condition, and maintenance
issues within their assigned areas. They also serve as “ambassadors” for each of their assigned
areas to ensure that high priority issues are addressed in a timely fashion, and as the first point-
of-contact for asset issues to drive root cause analysis and condition assessment. The Asset
Management group plans and conducts condition assessments of critical assets utilizing
corrosion consulting engineers, and CCTV contracts (Figure 4.3).
Asset Engineers also engage with
maintenance and capital improvement
project delivery teams to monitor the
scope of work and timing of planned
projects, to verify that the projects will
address the identified issues in a timely
manner. One of their key responsibilities
is to define the scope, appropriate timing
and budget requirements of future
maintenance and CIP projects, which are
the basis for future project, operations,
and maintenance budget development.
Moving forward, the Asset Engineers will
have the primary responsibility for
submitting CIP projects for Clearinghouse
approval.
Knowing the history, background
information and the future plans for each specific area, the Asset Engineers are in a unique
Figure 4.3. CCTV Inspection
31
position to coordinate asset maintenance and rehabilitation activities among various OCSD
divisions. These coordination efforts support the goal of OCSD’s Asset Management Program,
which is to lower lifecycle costs of infrastructure, at an acceptable level of risk, while
continuously delivering OCSD’s established levels of service.
Figure 4.4 illustrates the role Asset Engineers have in gathering information and understanding
needs to support coordination, planning and communication of changes to the plans.
Figure 4.4. Asset Engineer Role within Asset Management
4.2 Maintenance and CIP Project Execution
4.2.1 Project Management Office
OCSD’s Project Management Office Division manages the design and construction of new
facilities plus the rehabilitation of existing facilities to ensure the safe, cost effective transport,
and treatment of influent/effluent. This division is responsible for the delivery of projects from the
preliminary design stages through closeout of construction. The division provides standards,
processes, and methodologies to improve project quality, cost, and timeliness.
Small Project Delivery
The Small Projects Delivery team is a support arm of the Operations, Maintenance, and
Engineering divisions and is responsible for the design and construction of facilities and
maintenance projects. The purpose of this team is to deliver short term projects to effectively
manage life of existing assets and in doing so deferring construction of capital projects in the
longer term.
Project Engineers in the Small Projects Delivery team completes the scope of work, performs
project design (in-house or by consultant), bids the project in collaboration with Contracts or
Purchasing, and manages construction, implementation, commissioning, change management,
and closeout.
Asset Management Group
Asset Engineers
32
Project Management
The Project Management Group consists of engineers functioning as Project Managers for a
range of CIP projects including design/construction projects, planning studies, CEQA studies,
and research studies.
Project Delivery Support
The Project Delivery Support group supports the CIP and small projects with reporting and
monitoring tools for budgets, costs, schedules, cost estimates, amendments, change orders,
and resource and cash forecasting for all projects.
4.2.2 Design
The Design division ensures that all projects are designed and constructed to be reliable,
maintainable, and operable at optimum lifecycle costs in accordance with OCSD’s Engineering
Standards and codes. The division also ensures that the electrical and control systems on
projects are properly and safely constructed, commissioned, and executed in accordance with
the contract documents with minimal impact to operations, maintenance, local agencies, and the
public. The division provides process control SCADA system hardware, software and data
network support for collections and treatment plant processes that are highly reliable, safe,
secure, online, and available to monitor, record, control, and operate our facilities. This
division’s role is also to provide commissioning support services during construction.
The division includes the following groups:
Civil, Mechanical, and Process
Electrical and I&C
Process Controls Integration
Commissioning
4.2.3 Construction Management
The Construction Management Division ensures timely and quality construction and
commissioning execution. This division’s role is to provide construction management and
inspection services for OCSD projects to ensure they are safely constructed and inspected in
accordance with contract requirements and regulatory and legal codes while minimizing impacts
to operations, maintenance, local agencies and the public.
The division includes the following groups:
Plant No. 1 and Pump Stations
Plant No. 2 and Collections
Civil Inspection – Plant No. 1 and Pump Stations
Civil Inspection – Plant No. 2 and Collections
Electrical and I&C Inspection
4.3 Asset Maintenance
The Maintenance division provides reliable maintenance to OCSD’s assets. Maintenance-
related asset management involves implementing strategies that ensure OCSD’s assets will
operate at a required level of service and the lowest lifecycle cost with an acceptable level of
risk.
33
4.3.1 Maintenance
Maintenance Reliability Group
OCSD has developed a mature predictive maintenance (PdM) program, which is a core strategy
for maximizing asset reliability for major rotating mechanical and electrical equipment. The
premise of PdM is that regular monitoring of the actual mechanical condition of machine trains
will lead to optimal intervals between repairs, minimize the number and cost of unscheduled
repairs created by machine-train failures, and improve the overall equipment reliability.
The Reliability Technicians
use various techniques such
as:
Vibration analysis to
measure imbalance in
rotating equipment.
Thermography to
measure excessive
heat.
Oil and wear debris
analysis to predict
failure of lubricants.
Ultrasound inspection
of electrical power
distribution equipment
for detecting potential
for arc flash incidents
and mechanical rotating and
stationary equipment.
OCSD has a two-decade history of predictive maintenance as summarized in Table 4.1.
Table 4.1. High-level Summary of OCSD’s PdM Program
Year Activity
2002 Baseline vibration monitoring with consultant assistance
2006 Comprehensive vibration analysis program implementation at both treatment plants and 15
pump stations
2012
Comprehensive predictive maintenance program implementation and establishment of
Reliability Maintenance Team that includes engineers and four Reliability Maintenance
Technicians
2014 Predictive maintenance program assessment conducted by Allied Reliability Inc.
2018 Machinery lubrication program assessment conducted by Noria Corporation Inc.; Added
ultrasound and thermography to test electrical equipment
OCSD’s predictive maintenance and monitoring program is organized around the mechanical,
electrical and civil disciplines.
Figure 4.5. PdM Summary
34
Mechanical Discipline
The mechanical discipline has the most mature PdM
Program and involves variance trending of the PdM
test results, which include:
Vibration analysis
Oil analysis
Ultrasonic
Infrared thermography
IRIS motion camera (measures deflection and
displacement)
In addition to PdM activities for mechanical
equipment, OCSD also uses laser alignment techniques to enhance alignment rotating
machinery accuracy to increase operating life span.
Electrical Discipline
The electrical PdM Program continues to evolve
and currently includes the following tests:
Oil analysis for transformers
Ultrasound to detect arcing
Infrared thermography to detect hot
spots
Electrical power distribution equipment
preventive maintenance
Circuit breakers and protective relays
preventive maintenance and testing
Future tests expected to be added include:
Motor/generator circuit analysis
Medium voltage feeder cable testing to
determine the health of cables and
insulation
Civil Discipline
Civil maintenance covers proactive and corrective maintenance tasks for all OCSD civil assets
at all facilities located at Plants No. 1 and No. 2, as well as all OCSD pump stations and
collection system. Civil maintenance activities complement the existing maintenance programs
for mechanical, electrical and instrumentation. Civil maintenance includes the following
activities:
Valve and gate exercising program comprising more than 264 preventive maintenance
tasks for over 1,650 valves and gates in both plants and collection system.
Equipment rotation program to ensure equipment wear is predictable.
Operating, maintaining and cleaning pump stations and associated facilities.
Chemical conditioning of the sewage to reduce corrosion and control odors.
Figure 4.6. Vibration Analysis Equipment
Figure 4.7. Infrared Thermography
35
In addition to these activities, OCSD also implements life extension measures to increase the
useful life of expensive equipment through minor repairs, and corrosion control methods such
as coatings and cathodic protection.
Routine Maintenance
Beyond the advanced predictive maintenance strategies used to cost-effectively extend
equipment life, OCSD also performs routine time and cycle-based preventive maintenance (PM)
activities including:
Adjustments and mechanical alignments
Electrical equipment cleaning and tightening
Sensors and meters calibration
Changing of lubricants and filters
Exercising equipment
Equipment rebuilding and regular testing
Preventative Optimization
OCSD created a new Preventative Maintenance Optimization Group that will be tasked with
conducting an in-depth assessment to optimize planned maintenance strategies for new and
existing assets and to establish maintenance approaches and strategies for assets installed by
capital improvement projects prior to beneficial occupancy. The PM Optimization Program will
track, maintain, and manage assets throughout their lifecycles from design, construction,
commissioning, beneficial occupancy, operations and maintenance, to the eventual
decommissioning or replacement of assets.
This will ensure that asset lifecycle is maximized with the lowest risk to process failure by
achieving the intended reliability, at the lowest possible cost, and maximizing equipment
availability.
Maintenance Planners
Maintenance Planners are responsible for managing blanket maintenance service contracts,
planning and scheduling of craft-based maintenance activities, optimizing preventive
maintenance activities within Maximo, and coordination of complex maintenance activities
involving shutdowns and outages.
Maintenance Planners help drive reliability and effectiveness in the craft-based maintenance
work groups they support by ensuring that work groups have sufficient ready-to-execute work
with appropriate resources such as tools, materials, labor, and job plans.
Maintenance Planners are the owners of preventive maintenance and job plans. They are
responsible for maintaining preventive maintenance and job plan database within Maximo. They
continuously improved preventive maintenance by fine tuning job plans based upon input
received from field staff, leads, maintenance Supervisors and Engineers.
36
This page is intentionally left blank.
37
CHAPTER 5 STATE OF OCSD’S INFRASTRUCTURE
The Area AM Summaries are intended to summarize the condition of major assets, identify key
issues for further investigation, and summarize maintenance and CIP projects planned over the
next ten years. The approach for developing the AM Summaries is to assemble a list of major
assets, document key issues, define the average remaining useful lives of these assets, and
identify OCSD’s plan to address performance and reliability issues of these assets over the one,
five-, and ten-year planning horizons.
Every AM Summary is presented to the AM Council once annually. Each month, an Asset
Engineer presents one or more of the AM Summaries to the AM Council. The Area AM
Summaries are updated as needed and incorporated into the AMP which is published annually.
Asset Engineers maintain a detailed asset registry which is a primary data source for the Area
AM Summaries. The asset registries generally include the fields shown in Table 5.1.
Table 5.1. Asset Registry Fields
Field Description/Example
Asset Location Plant No. 1, Plant No. 2, or Collections
Discipline Examples: Civil, structural, mechanical, electrical and
instrumentation
Category Examples: Process, non-process
Asset Class Name Examples: Pump, valve
Asset Description Example: Primary Clarifier 3
Loop Tag Location-based asset unique identifier
Asset ID Asset unique identifier
Year Built The year the asset was commissioned
Original Project Code identifying under which project the asset was
installed
Useful Life (SP-151) Useful life estimates developed by project SP-151
Theoretical Remaining Useful Life Calculated remaining life based on installation date and
Useful Life (SP-151)
Field Adjusted RUL Score Remaining useful life adjusted based on field condition
Upcoming CIP Project No. Associated CIP project that will impact asset
Notes Text field including notes from Facility Master Plan or
other field observations
38
5.1 System Summaries
The following system-level summaries provide a high-level overview of the Area Asset
Management Summaries contained in Section 5.2. The system-level summaries are organized
by:
Plant No. 1
Plant No. 2
Collection System – Pump Stations
Collection System – Pipelines
The system-level summaries include an area map showing the general layout of the process
areas or collection system, and a table with the following fields:
Area No.
Area Name
Average RUL Score: Estimated average for each discipline (civil, structural,
mechanical, electrical, and instrumentation) and area based on the detailed Area AM
Summaries.
Average Remaining Useful Life (RUL) Score: Estimated average RUL score for each
discipline (civil, structural, mechanical, electrical, and instrumentation) or area based on an
average of the RUL scores provided by Asset Engineers in the detailed Area AM
Summaries.
Percentage of RUL Scores with 4s or 5s[1]: Percentage based on total number of RUL
scores assigned to each area by Asset Engineers in the detailed Area AM Summaries. The
percentage is an alternate metric for the overall condition of the area. A RUL score of 5
indicates less than 5 years of useful life remains for an asset or set of assets. A RUL score of
4 indicates 5 to 10 years of useful life remains for an asset or a set of assets.
Replacement Value ($million): Process area replacement value from the facility
valuation.
[1]RUL 5: <5 Years, RUL 4: 5 to 10 Years
39
Acronym Key:
OCSD = Orange County Sanitation District; OCWD = Orange County Water District; RUL = Remaining Useful Life;
TBD = To Be Determined
ASSET MANAGEMENT SYSTEM SUMMARY – PLANT NO. 1 OVERVIEW
Process Area Map
Remaining Useful Life and Replacement Value Summary
Ar
e
a
N
o
.
Area Name
Average Remaining Useful Life Score
Pe
r
c
e
n
t
a
g
e
o
f
RU
L
Sc
o
r
e
s
wi
t
h
4
s
o
r
5
s
Nu
m
b
e
r
o
f
P
r
o
j
e
c
t
s
to
A
d
d
r
e
s
s
4
s
&
5
s
Replacement
Value
($millions, in
2017 Dollars)
Ci
v
i
l
St
r
u
c
t
u
r
a
l
Me
c
h
a
n
i
c
a
l
El
e
c
t
r
i
c
a
l
In
s
t
r
u
m
e
n
t
a
t
i
o
n
Al
l
As
s
e
t
s
10 Preliminary Treatment 1 2 4 4 4 4 56% 4 $351.2
11 Primary Treatment 3 2 4 3 3 3 31% 8 $451.6
12 Secondary Treatment - Activated
Sludge 3 2 3 3 4 3 32% 11 $887.3
12 Secondary Treatment - Trickling
Filter 1 1 3 4 3 2 10% 6 $61.6
14 Interplant 2 2 3 2 1 2 17% 4 $683.1
15 Solids Handling - Digesters 2 1 2 2 2 2 3% 7 $231.2
15 Solids Handling - Facilities 2 1 2 2 2 2 9% 6 $206.5
16 Central Generationa 3 4 4 4 4 53% 12 $154.8
17 Utilities 3 2 3 2 1 2 8% 11 $176.2
18 Electrical Distributiona 3 3 48% 10 $74.1
19 Miscellaneous Structures &
Grounds To Be Determined TBD TBD TBD $220.0
Plant No. 1 Total 31% 79 $3,497.7
a Gray box with diagonal line indicates there are no assets assigned to this discipline within this process area.
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
40
Acronym Key:
OCSD = Orange County Sanitation District; RUL = Remaining Useful Life; TBD = To Be Determined
ASSET MANAGEMENT SYSTEM SUMMARY – PLANT NO. 2 OVERVIEW
Process Area Map
Remaining Useful Life and Replacement Value Summary
Ar
e
a
N
o
.
Area Name
Average Remaining Useful Life Score
Pe
r
c
e
n
t
a
g
e
o
f
RU
L
Sc
o
r
e
s
wi
t
h
4
s
o
r
5
s
Nu
m
b
e
r
o
f
P
r
o
j
e
c
t
s
to
A
d
d
r
e
s
s
4
s
&
5
s
Replacement
Value
($millions, in
2017 Dollars)
Ci
v
i
l
St
r
u
c
t
u
r
a
l
Me
c
h
a
n
i
c
a
l
El
e
c
t
r
i
c
a
l
In
s
t
r
u
m
e
n
t
a
t
i
o
n
Al
l
A
s
s
e
t
s
20 Preliminary Treatment 3 1 2 2 2 2 2% 11 $324.6
21 Primary Treatment 3 2 3 3 3 3 9% 7 $454.3
22 Secondary Treatment - Activated
Sludge 3 2 3 3 3 3 17% 8 $608.5
22 Secondary Treatment - Trickling
Filter 3 2 3 3 3 2 1% 7 $310.8
24 Effluent Disposal 2 1 2 3 3 2 12% 10 $817.1
25 Solids Handling - Digesters 3 3 3 4 4 3 45% 12 $322.7
25 Solids Handling - Facilities 2 2 2 2 2 2 16% 7 $201.5
26 Central Generationa 3 4 4 4 4 71% 13 $330.2
27 Utilities 2 3 3 2 1 2 5% 9 $98.3
28 Electrical Distributiona 3 3 57% 11 $72.7
29 Miscellaneous Buildings &
Grounds To Be Determined TBD TBD TBD $132.7
Plant No. 2 Total 29% 95 $3,673.4
a Gray box with diagonal line indicates there are no assets assigned to this discipline within this process area.
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
41
Acronym Key:
LS = Lift Station; OCSD = Orange County Sanitation District; PS = Pump Station; RUL = Remaining Useful Life
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM PUMP STATION OVERVIEW
Collection System Pump Stations Location Map
Remaining Useful Life and Replacement Value Summary
Pump Station
Average Remaining Useful Life Score
Pe
r
c
e
n
t
a
g
e
o
f
RU
L
Sc
o
r
e
s
wi
t
h
4
s
o
r
5
s
Nu
m
b
e
r
o
f
P
r
o
j
e
c
t
s
t
o
Ad
d
r
e
s
s
4
s
&
5
s
Replacement
Value
($millions, in
2017 Dollars)
Ci
v
i
l
St
r
u
c
t
u
r
a
l
Me
c
h
a
n
i
c
a
l
El
e
c
t
r
i
c
a
l
In
s
t
r
u
m
e
n
t
a
t
i
o
n
Al
l
A
s
s
e
t
s
15th Street 3 4 3 2 3 3 17% 2 $13.5
A Street 3 4 3 3 2 3 17% 1 $11.7
Bay Bridge 4 4 4 4 4 4 85% 3 $34.0
Bitter Point 2 3 2 1 2 2 15% 1 $32.2
College Avenue 3 2 3 2 1 2 8% 2 $24.0
Crystal Cove 3 3 4 3 2 3 17% 2 $2.5
Edinger 4 3 3 3 3 3 27% 4 $12.9
Lido 1 4 4 3 3 3 42% 5 $20.1
MacArthur 4 3 4 3 1 3 36% 3 $16.3
Main Street 4 3 4 2 2 3 38% 3 $44.0
Rocky Point 1 3 3 2 2 2 15% 2 $16.0
Seal Beach 3 4 5 5 3 4 75% 3 $41.5
Slater 4 4 4 3 2 3 38% 4 $35.2
Westside 3 3 3 2 3 3 0% 1 $30.6
Yorba Linda 3 4 4 3 2 3 27% 1 Not Valued
Totals 31% 37+13a $334.6
a 37 projects affect only one pump station. An additional 13 projects affect multiple pump stations.
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
42
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM PIPELINES OVERVIEW
Collection System Pipelines – Service Area Map
Pipeline Condition and Replacement Value Summary
Trunk
No. of Structural
Grade 4 or 5
Defectsa
No. of Pipes with
Structural Grade 4
or 5 Defectsa
Total Number of
Pipes
Percent of Pipe
Segments with
Isolated Grade 4
or Grade 5
Defects
Replacement
Value
($millions, in 2017
Dollars) b
Baker-Main 10 9 637 1.4% $275.5
Bushard 3 3 194 1.5% $241.6
Coast Hwy 3 2 145 1.4% $98.5
Euclid 3 3 428 0.7% $269.9
Interplant 0 0 165 0.0% $115.3
Knott 33 24 821 2.9% $625.0
Miller-Holder 2 2 266 0.8% $296.1
Newhope-Placentia 5 3 345 0.9% $209.0
Newport 6 5 510 1.0% $216.3
SARI 9 6 580 1.0% $516.1
Sunflower 30 26 494 5.3% $299.9
Talbert 3 3 112 2.7% $57.6
Total 107 86 4,697 1.8% $3,220.8
a Grade 4 and 5 defects include both isolated (i.e., pipes that can be fixed by point repair) and non-isolated (i.e., pipes that needs rehabilitation or
replacement) type pipe. b The abandoned pipelines at the Airbase ($6,366,516) and the Harvard Area Trunk Sewer ($191,784) areas are not included in the total.
Trunk Miles of Pipe with
Grade 4 Defectsa
Miles of Pipe with
Grade 5 Defectsa
Total Miles with
Grade 4 or Grade
5 Defects
Total Miles
Percent of Length
with Non-Isolated
4s or 5s
Baker-Main 0.18 0.12 0.3 42.6 0.7%
Bushard - - - 21.4 -
Coast Hwy - - - 11.4 -
Euclid - - - 34.4 -
Interplant - - - 16.9 -
Knott 0.44 2.04 2.49 73.2 3.4%
Miller-Holder 0.23 0.23 31.5 0.7%
Newhope-Placentia 0.11 0.04 0.15 30.9 0.5%
Newport 0.1 0.1 31.5 0.3%
SARI 0.25 0.25 50.3 0.5%
Sunflower 0.39 0.23 0.62 34.8 1.8%
Talbert - - - 8.4 -
Total 1.7 2.43 4.13 387.4 1.1%
a The miles of pipe with grade 4 or 5 defects are indicated only for non-isolated pipes.
Structural Grade Defect Legend:
Grade 5 Grade 4
43
5.2 Area Asset Management Summaries
The following AM Summaries document the current state of process areas in both plants and
the collection system. The remainder of this section contains the AM Summaries organized as
follows:
Plant No. 1 Asset Management Summaries
Preliminary Treatment
Primary Treatment
Secondary Treatment – Activated Sludge
Secondary Treatment – Trickling Filters
Interplant
Solids Handling – Digesters
Solids Handling – Facilities
Central Power Generation
Utilities
Electrical Distribution
Plant No. 2 Asset Management Summaries
Preliminary Treatment
Primary Treatment
Secondary Treatment – Activated Sludge
Secondary Treatment – Trickling Filters
Effluent Disposal
Solids Handling – Digesters
Solids Handling – Facilities
Central Power Generation
Utilities
Electrical Distribution
Collection System Asset Management Summaries
Pump Stations
Pipelines
The AM Summaries are built around a common structure. This structure provides a framework
for continued use and development of the summaries. Key structure elements for AM
Summaries are shown in Figure 5.1 below.
44
Figure 5.1. Area Asset Management Summary Structure
45
5.2.1 Plant No. 1 Asset Management
Summaries
46
This page is intentionally left blank.
47
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 10 – PLANT NO. 1 PRELIMINARY TREATMENT
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Me
t
e
r
i
n
g
&
Di
v
e
r
s
i
o
n
Su
n
f
l
o
w
e
r
Pu
m
p
S
t
a
t
i
o
n
St
e
v
e
An
d
er
s
e
n
L
i
f
t
St
a
t
i
o
n
Ba
r
s
c
r
e
e
n
s
Ma
i
n
S
e
w
a
g
e
Pu
m
p
s
Gr
i
t
C
h
a
m
b
e
r
Sp
l
i
t
t
e
r
B
o
x
Bi
n
L
o
a
d
i
n
g
Od
o
r
C
o
n
t
r
o
l
Civil
Effluent Piping - - - - - - 1 - -
Structural
General 2 2 1 2 2 2 2 3 3
Mechanical
Piping 5 - 1 - 1 - - - -
Gates/Valves 5 5 2 5 5 5 5 - 3
Gearboxes - 2 - 1 - - - 4 -
Screens - - - 4 - - - - -
Pumps - 3 3 - 3 - - - 3
Conveyors - - - 4 - - - 4 -
Fans/Blowers 4 3 1 4 4 4 - 4 5
Electrical
Operators 5 - - - - - 5 - -
Motors - 3 3 1 5 - - 5 -
Variable Frequency Drives - - 3 - 4 - - - 4
Motor Control Centers 5 5 2 5 5 5 - 5 5
Instrumentation
General 4 4 3 4 4 - 4 - 5
Major Assets
Major Assets Quantities
Metering & Diversion
Flowmeters 7
Gates 26
Sunflower Pump Station
Screw Pumps 2
Motors 2
Gearboxes 2
Lube Oil Systems 2
Gates 5
Major Assets Quantities
Steve Anderson Lift Station
Pump/Motor/VFD 4
Flowmeter 1
Barscreens
5/8” Barscreens 2
1” Barscreens 2
Gates 22
Major Assets Quantities
Main Sewage Pumps
Pump/Motor/VFD 5
Headworks #1 Pumps 2
Gates 15
Splitter Box
Gates 5
Weir Gates 15
Flowmeters 3
Major Assets Quantities
Grit Chambers
Grit Chambers 5
Gates 19
Stop Plates 10
Flap Gates 5
Blowers 3
Bin Loading
Paddle Conveyors 2
Belt Conveyor 1
Major Assets Quantities
Odor Control
Bioscrubbers 2
Chemical Scrubbers 4
Acronym Key:
RUL = Remaining Useful Life;
VFD = Variable Frequency Drive
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
48
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 10 – PLANT NO. 1 PRELIMINARY TREATMENT
Key Issues
Key Issues Actions and Recommendations
P1-105 Construction – This project will rehabilitate most assets
throughout the preliminary treatment area, however the construction
completion date is far in the future. Some assets have very little
remaining life or have failed already and will need interim solutions
before they are addressed by the project.
Continue to actively monitor the condition of aging assets scheduled for
repairs/replacement under P1-105 and develop temporary/minimal solutions
as applicable until a permanent solution is provided by P1-105. In some
instances, failed equipment may need to be replaced and removed from the
P1-105 scope, but this approach should be minimized.
Steve Anderson Lift Station – Steve Anderson Lift Station has
experienced vibration issues and equipment failures over the past few
years.
New pumps without vibration issues are being installed to replace the
existing pumps. These replacements are planned to continue until all four
pumps have been replaced. Vibration of the new pumps should continue to
be monitored to confirm their performance.
Rags – Rags have become an ongoing issue throughout the
preliminary and primary process areas. The prevalence of rags is
likely due to the rise in popularity of “flushable wipes”. Rags passing
the barscreens have caused failures and increased wear on various
mechanical equipment.
P1-105 will be replacing the existing 1-inch barscreens with 5/8-inch
barscreens. This should reduce the number of rags passing the barscreens
into the treatment process.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
P1-105 Headworks Rehabilitation at Plant No. 1
Metering & Diversion, Sunflower Pump
Station, Barscreens, Main Sewage
Pumps, Grit Chambers, Splitter Box, Bin
Loading, Odor Control
Rehabilitate structures of impacted facilities.
Replace mechanical/electrical/instrumentation as-needed
throughout impacted facilities.
Improve grit handling.
FE19-04 Sunflower Pump Station Repairs Sunflower Pump Station Rehabilitate Sunflower Pump Station.
FE18-11 Headworks Explosive Gas Monitoring
Systems at Plant No. 1 and No. 2 Metering & Diversion, Odor Control Install Lower Explosive Limit monitoring system to detect explosive
gas.
X-044 Steve Anderson Lift Station Rehabilitation Steve Anderson Lift Station Rehabilitate mechanical, electrical, and instrumentation.
Acronym Key:
CIP = Capital Improvements Program; FY = Fiscal Year
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
49
Major Assets
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 11 – PLANT NO. 1 PRIMARY TREATMENT
Process Schematic
Major Assets Remaining Useful Life
Asset Type
EB
D
B
PB
1
PB
2
PB
3
PB
4
PB
5
WS
S
P
S
PI
S
B
Ce
n
t
e
r
f
e
e
d
Ch
a
n
n
e
l
s
PB
6
-15
PB
1
6
-31
Od
o
r
Co
n
t
r
o
l
Civil
Effluent Piping 4 2 2 5 5 5 3 - - 1 1 -
Structural
Structures 1 3 3 2 3 3 3 4 2 3 2 2
Cover 1 2 2 3 3 3 3 3 2 2 2 -
Mechanical
Piping - - - - - - 3 - - - - -
Gates/Valves 3 5 5 5 5 5 3 3 3 3 3 2
Sludge/Scum Collection System - 5 5 5 5 5 - - - 3 4 -
Sludge Pumping System - 5 5 3 3 3 - - - 3 4 -
Scum Pumping System - 5 5 3 3 3 - - - 4 4 -
Electrical
General 3 5 5 3 3 3 3 2 - 2 2 3
Instrumentation
General 3 5 5 3 3 3 3 3 - 3 3 3
Major Assets Quantities
Rectangular Primary Basins
Basins 26
Thickened Sludge Pumps 9
Dilute Sludge Pumps 4
Dilute Sludge Sumps 2
Scum Pumps 12
Scum Pits 6
Major Assets Quantities
Circular Primary Basins
Basins 3
Sludge Pumps 4
Scum Pumps 3
Chemicals
Polymer Tanks 4
FeCl3 Tanks 1
Waste Sidestream Pump Station 1
Pumps 3
Major Assets Quantities
Primary Odor Scrubber Complex
Chemical Scrubbers 4
HCl Tanks 1
HCl Pumps 2
NaOH Tanks 1
NaOH Pumps 5
Bleach Tanks 1
Bleach Pumps 8
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
Acronym Key:
EBDB: East Basin Distribution Box; FeCl3= Ferric chloride;
HCl= Hydrochloric acid; NaOH= Sodium hydroxide;
PB = Primary Basin; PISB: Primary Influent Splitter Box;
WSSPS: Waste Sidestream Pump Station
50
Acronym Key:
CIP = Capital Improvements Program; FY = Fiscal Year; GWRS = Groundwater Replenishment System; MGD = Million Gallons per Day;
OCSD = Orange County Sanitation District; OCWD = Orange County Water District; PISB = Primary Influent Splitter Box
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 11 – PLANT NO. 1 PRIMARY TREATMENT
Key Issues
Key Issues Actions and Recommendations
Rectangular Primary Basin – The rectangular
primary basins experience relatively frequent
issues that require maintenance. These issues
require ongoing attention from maintenance and
can affect Plant No. 1 treatment capacity.
A number of projects are planned to address rectangular primary basin issues and reliability
including MP-462, P1-133, and X-017. However, these projects cannot make the rectangular
basins maintenance free. OCSD should expect to dedicate a significant amount of maintenance
labor to these basins, especially during times when capacity is reduced by projects. Also, a
planned Preventative Maintenance approach should be taken for continued maintenance on the
mechanical parts within the basins after work is complete on MP-462.
Construction Sequencing – There are many
upcoming projects that will perform work on the
Plant No. 1 primary treatment system. These
projects are largely interdependent on one another
and will temporarily impact the primary capacity at
Plant No. 1.
Continue to holistically assess the capacity/treatment consequences of the upcoming projects,
especially if schedules change during design and construction. Perform a study to understand if
phasing the replacement of the circular primary basins under P1-126 is feasible.
GWRS Final Expansion – The final expansion of
OCWD’s GWRS system is expected to be
complete in 2023 and will produce 130 MGD of
purified recycled water. This will require OCSD to
provide more flow to OCWD.
OCSD is executing a number of projects to prepare for the GWRS Final Expansion. The most
directly applicable is P2-122 which will provide additional flow to OCWD from Plant No. 2 while
also increasing OCSD’s flexibility to route flows between Plant No. 1 and Plant No. 2. The
optimization of flow routing will be an ongoing consideration for OCSD operations and should be
periodically re-evaluated as operating conditions change.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
31
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
PRN-00563 P1-33/37 Scum Study Primary Basins 6-31 Perform a study to determine the best solution to the various scums
system issues, such as issues for the scum pumping system.
MP-462 Primary Basin Sludge Collections System
Rehabilitation at Plant No. 1 (Phase 3) Primary Basins 6-15
Replacement of mechanical parts in 9 rectangular basins. This is
Phase 3 of a three phased approach for the scum/sludge collection
system.
PRN-00567 Plant No. 1 Primary Basin Rebar Protection
Blanket Contract Primary Basins 6-15 Repair protect exposed rebar.
P1-133 Primary Sedimentation Basins No. 6-31
Reliability Improvements at Plant No. 1 Primary Basins 6-31 Upgrade of the sludge pumping system. Structural repair of
launders in PISB. Repair of foul air system.
P1-126 Primary Clarifiers Replacements and
Improvements at Plant No. 1 Primary Basins 3, 4, and 5 Replace primary basins 3, 4, and 5. Rehabilitate associated
conveyance pipes and structures. Demolish Primary Basins 1-2.
X-017 Plant No. 1 Primary Clarifiers 6-37
Rehabilitation Primary Basins 6-31 Major rehabilitation of primary basins 6-31.
X-079 Primary Scrubber Rehabilitation Project at
Plant No. 1 Odor Control Replacement of the Plant No. 1 primary basin air scrubbing system.
X-006 Waste Sidestream Pump Station Upgrade Waste Sidestream Pump Station Pump station rehabilitation and capacity increase.
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
51
Acronym Key:
AS1 = Activated Sludge Plant No. 1; AS2 = Activated Sludge Plant No. 2; DAFT = Dissolved Air Flotation Thickener;
HVAC=Heating, Ventilation, and Air Conditioning; OCWD=Orange County Water District;
PEDB1 = Primary Effluent Distribution Box 1; PEDB2 = Primary Effluent Distribution Box 2;
PEPS = Primary Effluent Pump Station; PEPS 2 =Primary Effluent Pump Station 2; PLC = Programmable Logic Controller;
PS= Pump Station; RAS = Return Activated Sludge; RUL=Remaining Useful Life; WAS = Waste Activated Sludge;
WSSPS2=Waste Sidestream Pump Station 2
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 12 – PLANT NO. 1 SECONDARY TREATMENT – ACTIVATED SLUDGE
Process Schematic
Key Issues
Key Issues Actions and Recommendations
Activated Sludge
Plant No. 1 – AS1 is
an aging facility.
Corrosion assessment in 2016 showed several locations of corrosion on
the wall between reactors and steel re-bar support chairs missing.
Baffle wall supports and vertical airpipes were damaged on some of the
basins and are monitored on remaining basins.
Instrumentation is monitoring and replacing the equipment as needed.
Activated Sludge
Basins Diffusers
Diffusers for activated sludge plants will be replaced in-house by
Maintenance.
Primary Effluent
Distribution Box 2 Demolished by P1-126.
Primary Effluent
Pump Station
PEPS Pump 1 will be repaired in 2020 and the pump station will be
demolished by a future project (P1-126).
Major Assets Remaining Useful Life
Asset Type
PE
D
B
1
PE
P
S
Bl
o
w
e
r
B
u
i
l
d
i
n
g
1
AS
1
A
e
r
a
t
i
o
n
B
a
s
i
n
s
AS
1
C
l
a
r
i
f
i
e
r
s
AS
1
R
A
S
P
S
AS
1
W
A
S
AS
2
P
E
P
S
2
AS
2
B
l
o
w
e
r
s
AS
2
Ae
r
a
t
i
o
n
B
a
s
i
n
s
AS
2
C
l
a
r
i
f
i
e
r
s
AS
2
R
A
S
/
W
A
S
P
S
WS
S
P
S
2
PE
P
S
2
PE
D
B
2
AS
1
&
A
S
2
J
u
n
c
t
i
o
n
B
o
x
e
s
DA
F
T
s
DA
F
T
s
P
o
l
y
m
e
r
S
y
s
t
e
m
Civil
Effluent Piping 4 - 3 3 3 5 - - - - - - - 1 1 1 4 -
Structural
Buildings - 2 2 - - 2 - - 1 - - - - - - - 4 -
Structures 4 3 - 2 3 - - 1 - 1 1 - 1 1 1 1 4 -
Mechanical
Piping - 3 2 3 3 5 3 2 2 2 2 2 2 - - - 4 4
Pumps - 5 - - - 3 3 - - - - 3 3 - - - 5 5
Diffusers - - - 4 - - - - - 4 - - - - - - - -
Mixers - - - 3 - - - - - 2 - - - - - - - -
Clarifier/DAFT Moving Mechanism - - - - 2 - - - - - - - - - - - 4 -
Blowers - - 3 - - - - 2 - - - - - - - - -
Drain Gates & Inlet Gates 4 - - 3 3 - - - - 2 2 - - 1 2 - - -
HVAC & Ventilation - 3 - - - - - 2 - - - - - - - - -
Chemical/polymer Facility - - - - - - - - - - - - - - - - - 5
Electrical
Variable Frequency Drives - 2 - 2 2 2 2 - - 4 4 4 4 - - - 2 2
Motor Control Centers - 4 - 4 4 4 4 - - 2 2 2 2 - - - 3 3
Instrumentation-
PLCs, Flow Meters - 5 5 5 5 5 5 - 2 2 2 2 2 - - - 5 5
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
52
Acronym Key:
AS1 = Activated Sludge Plant No. 1; AS2 = Activated Sludge Plant No. 2; DAFT = Dissolved Air Flotation Thickeners;
PS=Pump Station; RAS = Return Activated Sludge; WAS = Waste Activated Sludge; TWAS = Thickened Waste Activated Sludge
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 12 – PLANT NO. 1 SECONDARY TREATMENT – ACTIVATED SLUDGE
Major Assets
Major Assets Quantities
Primary Effluent Pump Station
Building 1
Wetwell 1
Pumps 2
Discharge Valves 3
AS1 Aeration Basins
Aeration Basins 10
Inlet gates 10
AS1 Blower Building 1
Blower Building 1
Blowers 5
Major Assets Quantities
AS1 Secondary Clarifiers
Secondary Clarifiers 26
Inlet gates 78
Sludge collectors 52
AS1 RAS PS / WAS PS
RAS PS Building 1
RAS Pumps 5
WAS Pumps 4
Primary Effluent Pump Station 2
Structure 1
Gate 1
Major Assets Quantities
AS2 Aeration Basins
Aeration Basins 6
Inlet gates 6
AS2 Blower Building 2
Blower Building 1
Blowers 4
AS2 Secondary Clarifiers
Secondary Clarifiers 6
Sludge collectors 6
AS2 RAS PS / WAS PS
RAS Pumps 12
WAS Pumps 6
Surface Wasting Pumps 6
Scum Pumps 6
Major Assets Quantities
Waste Side Stream Pump Station 2
Pumps 2
Structure 1
Primary Effluent Distribution Box 1
Structure 1
Gates 1
Primary Effluent Distribution Box 2
Structure 1
Gates 11
AS1 and AS2 Junction Boxes
Junction Box Structures 8
Major Assets Quantities
Dissolved Air Flotation Thickeners
Concrete Tanks 6
Mechanical Sweep 6
Recycle Pumps 12
Retention Tank 6
TWAS Pumps 12
DAFTs Polymer System
Storage Tank 2
Mix Tank 2
Polymer Transfer Pumps 2
Feed Pumps 6
53
Acronym Key:
AS1 = Activated Sludge Plant No. 1; AS2 = Activated Sludge Plant No. 2; CIP=Capital Improvement Program; FY=Fiscal Year;
DAFT = Dissolved Air Flotation Thickeners; PS=Pump Station; RAS = Return Activated Sludge; WAS = Waste Activated Sludge;
TWAS = Thickened Waste Activated Sludge
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 12 – PLANT NO. 1 SECONDARY TREATMENT – ACTIVATED SLUDGE
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
PRN-00516 PEPS Pump #1 Mechanical Repair PEPS Repair of PEPS Pump #1.
PRN-00520 AS1 Blower flowmeter modifications AS1 Blowers Add flow conditioner to improve flow readings.
PRN-00478 Plant No. 1 AS2 Clarifier #31 Catwalk - Coatings AS2 Clarifier #31 Coating repair.
PRN-00375 Plant No. 1 AS2 blower silencer piping modification AS2 blowers Provide access to service the blowers.
PRN-00402 Plant No. 1 activated sludge clarifier lighting
replacement AS1 Clarifiers 1 to 14 lighting Replace 16 light poles and fixtures.
MP-395 AS1 Influent gate assessment and repair AS1 Basins 3, 4, 5, 6 Modify the AS1 Basins 3 to 6 influent gates.
P1-129 Return Activated Sludge Piping Replacement at AS1 AS1 RAS Pipes Replace the RAS pipes from the RAS pumps to the
basins.
FE 15-07 Secondary Treatment and Plant Water VFD
Replacement Replacing RAS pumps VFDs Replace RAS pumps.
X-043 DAFT Demolition at Plant No. 1 DAFTS Demolish DAFTS since the new thickening centrifuges are
in service and DAFT is no longer needed.
X-048 AS1 Aeration Basin and Blower Rehabilitation AS1 Aeration Basin and Blower Major rehabilitation of the basins and blowers.
X-049 AS1 Clarifier and RAS PS Rehabilitation at Plant No.
1 AS1 Clarifier and RAS PS Major rehabilitation of the clarifiers and RAS pump station.
54
This page is intentionally left blank.
55
Acronym Key:
PLC = Programmable Logic
Controller;
RUL = Remaining Useful
Life
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 12 – PLANT NO. 1 SECONDARY TREATMENT – TRICKLING FILTERS
Process Schematic
Major Assets
Major Assets Quantities
Trickling Filter Pump Station
Structure 1
Trickling Filter Pumps 3
Trickling Filters
Trickling Filter Basins 2
Rotary Distributor 2
Recirculation Fans 8
Secondary Clarifiers
Circular Clarifiers 2
Sludge Collector 2
Junction Boxes
Structure 6
Major Assets Remaining Useful Life
Asset Type
Tri
c
k
l
i
n
g
F
i
l
t
e
r
Pu
m
p
S
t
a
t
i
o
n
Tr
i
c
k
l
i
n
g
F
i
l
t
e
r
s
Se
c
o
n
d
a
r
y
C
l
a
r
i
f
i
e
r
s
Ju
n
c
t
i
o
n
B
o
x
e
s
Civil
Effluent Piping 1 1 1 1
Structural
Buildings - 1 1 -
Structures 1 1 1 1
Mechanical
Piping 2 2 2 2
Pumps 3 - 3 -
Distributor Drive - 3 - -
Ventilation Fans - 3 - -
Trickling Filter Media - 4 - -
Clarifier Moving Mechanism - - 3 -
Valves, Gates - - - 2
Electrical
Motor Control Centers 3 3 3 -
Variable Frequency Drives 5 3 5 -
Instrumentation
PLCs & Flow Meters 3 3 3 -
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
56
Acronym Key:
CIP = Capital Improvements Program; FY= Fiscal Year; VFD = Variable Frequency Drive
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 12 – PLANT NO. 1 SECONDARY TREATMENT – TRICKLING FILTERS
Key Issues
Key Issues Actions and Recommendations
Trickling Filter Sludge Pumps – Currently, only one sludge pump is
in service.
Project FE19-03 was created to replace the trickling filter’s sludge and scum
pumps.
Trickling Filter Influent Pumps – VFDs are obsolete and need to be
replaced. Replacement parts are not available.
Clearinghouse approved the replacement of the VFDs (PRN-00492) and
adding a second source of power from SWGR-TFB bus to Drive #1.
Electrical – Low voltage cable failure.
Several damaged cables were replaced by Maintenance in the past, and
Clearinghouse approved a project to assess the remaining low voltage cables
and replace the damaged cables. (PRN-00409).
Odor Control – The Trickling Filters are open and are a source of foul
air at Plant No.1.
Trickling Filter Bleach Test at Plant No. 1 (RE18-1) to study the performance
of adding bleach to control the odors.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
FE19-03
FE19-03 Trickling Filter Sludge and
Scum Pumps Replacement at Plant
No. 1
Sludge pumping Replace the sludge pump with two new pumps, and
remove 3 scum pumps with straight piping.
PRN-00414 Snail Control at Plant No. 1 Trickling
Filters Trickling Filters
Install permanent caustic dosing pumps and pipes to
dose caustic to the Trickling Filters. Currently, Operations
is using caustic totes.
PRN-00492 Plant No. 1 Trickling Filter Pumps VFD
replacement (3 pumps) Trickling Filters Pump Station Replace the obsolete VFDs on the Trickling Filter influent
pumps.
PRN-00409 Low Voltage Cable Assessment Low voltage cables from Power
Building 8 to the Trickling Filters Assess and replace the damaged cables.
RE18-01 Trickling Filter Bleach Test at Plant
No. 1 Trickling Filters A research project to study the impact of dosing bleach in
controlling the odors.
X-015 Trickling Filters Facilities
Rehabilitation at Plant No. 1 Major rehabilitation project Replace the Trickling Filter Feed Pumps, distribution
arms and media, and secondary clarifier mechanisms.
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
57
Acronym Key:
EJB = Effluent Junction
Box; PE = Primary Effluent;
PEDB2 = Primary Effluent
Distribution Box 2;
PEJB1 = Primary Effluent
Junction Box 1;
RUL= Remaining Useful
Life; SE = Secondary
Effluent; SEJB =
Secondary Effluent
Junction Box;
SEJB2 = Secondary
Effluent Junction Box 2;
SEJB3 = Secondary
Effluent Junction Box 3;
SEJB = Secondary Effluent
Junction Box 7;
TF = Trickling Filter
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 14 - PLANT NO. 1 INTERPLANT
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Plant No. 1 Facility Santa Ana
Corridor
Br
o
o
k
h
u
r
s
t
C
o
r
r
i
d
o
r
El
l
i
s
/
B
u
s
h
a
r
d
C
o
r
r
i
d
o
r
EJ
B
SE
J
B
SE
J
B
3
SE
J
B
7
PE
J
B
1
SE
J
B
2
10
8
”
PE
/
S
E
66
”
PE
84
”
SE
12
0
”
S
E
16
”
Ga
s
Civil
Effluent Pipe - - - - - - 3 2 4 1 - 2 -
Gas - - - - - - - - - - 1 - -
Structural
Structure 1 3 2 1 4 1 - - - - - - -
Mechanical
Sluice Gates 3 - 3 1 - - - - - - - - -
Butterfly Valves 5 - - - - - - - - - - - -
Electrical
Fiber Optic - - - - - - - - - 1 - - 1
Major Assets
Major Assets Quantities
Plant No. 1 Facility
Junction Boxes 6
Gates 13
Butterfly Valves 5
Large Diameter Piping 6
Major Assets Quantities
Santa Ana Corridor
Large Diameter Piping 3
Fiber Optic
Communication 1
Digester Gas Piping 1
Major Assets Quantities
Brookhurst Corridor
Large Diameter Piping 1
Ellis/Bushard Corridor
Fiber Optic
Communication 1
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
58
Acronym Key:
CIP = Capital Improvement Program; EJB = Effluent Junction Box; FY = Fiscal Year; GWRS = Groundwater Replenishment Program;
OCWD = Orange County Water District; PE = Primary Effluent; PEJB = Primary Effluent Junction Box; SE = Secondary Effluent
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 14 – PLANT NO. 1 INTERPLANT
Key Issues
Key Issues Actions and Recommendations
Maintenance of Gates, Valves, & Mechanical Equipment –
Mechanical components of the various junction structures are not
typically operated during normal plant operation.
Ensure that mechanical equipment is routinely exercised to prolong its life
and ensure its availability/function when needed.
Warranty of J-117A – Determine the status of the recent interplant
piping repairs that were performed as part of J-117A. Make necessary repairs and corrections as identified.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
32
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
GWRS GWRS Pump Station 66” PE Install new OCWD force main within existing 66” interplant pipe
PRN-00522 EJB Coating Repairs EJB Replacement and recoating of various piping and supports
MP-657 Santa Ana River Erosion Control Interplant Piping Correction of existing earthen slope above the interplant pipes
X-XXX PEJB-1 & Piping Rehabilitation PEJB-1 Rehab the existing junction structure and associated piping
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
59
Acronym Key:
PLC = Programmable Logic
Controller;
RUL = Remaining Useful
Life
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 15 – PLANT NO. 1 SOLIDS HANDLING – DIGESTERS
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Di
g
e
s
t
e
r
5
Di
g
e
s
t
e
r
6
Di
g
e
s
t
e
r
7
Di
g
e
s
t
e
r
8
Di
g
e
s
t
e
r
9
Di
g
e
s
t
e
r
10
Di
g
e
s
t
e
r
11
Di
g
e
s
t
e
r
12
Di
ge
s
t
e
r
13
Di
g
e
s
t
e
r
14
Di
g
e
s
t
e
r
15
Di
g
e
s
t
e
r
16
Fe
r
r
i
c
S
y
s
t
e
m
Civil
Effluent Piping 2 2 2 2 2 2 2 2 2 2 2 2 -
Structural
Digester 1 1 1 1 1 1 1 1 1 1 1 1 -
Mechanical
Piping 2 2 2 2 2 2 2 2 2 2 2 2 4
Chemical Pumps - - - - - - - - - - - - 4
Ferric Control System - - - - - - - - - - - - 4
Sludge Mixing Pumps 2 2 2 2 2 2 2 2 2 2 2 2 -
Sludge Recirculation &
Heating System - - 2 2 2 2 2 2 2 2 2 2 -
Hot Water System - - 2 2 2 2 2 2 2 2 2 2 -
Sludge Transfer Pumps 2 2 2 2 2 2 -
Electrical
Motor Control Centers 2 2 2 2 2 2 2 2 2 2 2 2 -
Instrumentation
PLCs & Flow Meters 2 2 2 2 2 2 2 2 2 2 2 2 -
Major Assets
Major Assets Quantities
Anaerobic Digesters
Digesters (7-16) 10
Holding Digesters (5 & 6) 2
Sludge Mixing Pumps 22
Grinders 10+3
Sludge Recirculation
Pumps 10
Major Assets Quantities
Anaerobic Digesters (Continued)
Hot Water Circulation
Pumps 10
Heat Exchangers 10
Bottom Sludge Pumps 5
Digesters Transfer Pumps 3
Ferric System
Storage Tanks 2
Feed Pumps 2
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
60
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 15 – PLANT NO. 1 SOLIDS HANDLING – DIGESTERS
Key Issues
Key Issues Actions and Recommendations
High Rate Mixing Pumps mechanical seals failure – The high rate
mixing pumps are experiencing higher than expected failures of the
mechanical seals.
There are several efforts by Maintenance and Engineering to reduce the
failure rate including precision alignment of the pumps, studying sludge
piping supports (PS19-01) and monitoring the vibrations.
Structures – Seismic risk. The PS15 - 06 Seismic Evaluation of Structures at Plant Nos. 1 and 2 has
identified lateral Spreading as the main seismic risk for the digesters.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
P1-135 Digester Ferric Chloride Piping Replacement at
Plant No. 1 Digesters, ferric dosing system
This project will replace the digester ferric chloride
piping, valves and appurtenances to its point of
connection with the digesters.
MP- 563 Plant No. 1 digester 9 & 10 Pump Work
Platform Replacement Digesters 9 and 10 mixing pumps Adding access platforms for maintenance activities.
MP - 561 Plant No. 1 Digesters 8 and 11 Area Lighting
Installation Digesters 8 and 11 Relocate existing warehouse.
MP- 588 Digester 7 & 8 Sludge Pipeline Improvements Digester 7 and 8 sludge pipes Adding flexibility in transferring sludge.
MP- 610 CP-DIG LEL Area Safety Monitoring
Obsolescence
The LEL monitoring system in Digester 11 to
16 pump room and tunnels Upgrading the LEL monitors.
PS19-01 Digester 6 Pipe Stress Analysis at Plant No. 1 Digester 6 high-rate mixing pumps Performing pipe stress analysis to improve pipe
supports if needed.
N/A Digester Cleaning On-going maintenance activity Cleaning the digesters and performing preventive
condition assessment every 5 to 7 years.
Acronym Key:
CIP=Capital Improvement Program; CP=Control Panel; DIG=Digester; FY=Fiscal Year;
LEL= Lower Explosive Level; N/A=Not Applicable
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
61
Acronym Key:
RUL= Remaining Useful
Life;
PLC=Programmable Logic
Controller
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 15 – PLANT NO. 1 SOLIDS HANDLING – FACILITIES
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Bo
i
l
e
r
S
y
s
t
e
m
Sl
u
d
g
e
B
l
e
n
d
i
n
g
Fa
c
i
l
i
t
y
Th
i
c
k
e
n
i
n
g
Sy
s
t
e
m
De
w
a
t
e
r
i
n
g
Sy
s
t
e
m
De
w
a
t
e
r
i
n
g
O
d
o
r
Co
n
t
r
o
l
Tr
u
c
k
L
o
a
d
i
n
g
Ga
s
H
a
n
d
l
i
n
g
Ga
s
H
o
l
d
e
r
Civil
Effluent Piping - 1 1 1 - 1 3 3
Structural
Structures - 1 - - - 1 - 3
Buildings - - 1 1 - 1 2 -
Mechanical
Piping 1 - 1 1 1 1 3 -
Pumps-grinders - 1 1 1 1 1 - -
Boilers & Heat Exchangers 2 - - - - - - -
Centrifuges - - 1 1 - - - -
Biofilters and carbon media - - - - 1 - - -
Chemical/polymer System - - 1 1 1 - - -
Gas Compressors - - - - - - 4 -
Gas Dryer - - - - - - 5 -
Gas Flares - - - - - - 4 -
Silo Cake Conveyors - - - - - 1 - -
Silo Sliding Frames - - - - - 1 - -
Electrical
Variable Frequency Drives - 2 2 2 - 2 - -
Motor Control Centers 2 1 1 1 1 1 4 -
Instrumentation
PLCs & Flow Meters 1 1 1 1 1 1 5 -
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
62
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 15 – PLANT NO. 1 SOLIDS HANDLING – FACILITIES
Major Assets
Major Assets Quantities
Thickening System
Sludge Blending Tanks 3
Thickening Grinders 3
Centrifuge Feed Pumps 3
Thickening Centrifuges 3
Thickened Sludge Wet
Wells 3
Thickened Sludge Pumps 6
Major Assets Quantities
Thickening System (Continued)
Centrate Wetwell 1
Centrate Pumps 3
Chemical Equipment
Thickening Polymer Feed
Pumps 3
Dewatering Polymer Feed
Pumps 3
Major Assets Quantities
Chemical Equipment (Continued)
Polymer Mixing/Aging
Tank 6
Polymer Make‐Down Unit 4
Dewatering System
Dewatering Grinders 2
Centrifuge Feed Pumps 3
Dewatering Centrifuges 3
Cake Transfer Pumps 3
Major Assets Quantities
Dewatering Odor Control
3-Stage Packed Tower
Scrubbers 3
Carbon Media 2
Truck Loading
Cake Storage Silos 4
Cake Silo Transfer Pumps 4
Stand-by Truck Loading
Bay 1
Major Assets Quantities
Gas Handling
Low Pressure Gas Holder 1
Gas Compressors 3
Gas Dryer 1
Gas Flares 3
Boiler 1
Key Issues
Key Issues Actions and Recommendations
Maintainability of the Equipment – There are several
improvements that are needed for Thickening and Dewatering Area
including lighting improvement, equipment access for maintenance,
instrument air and power access and improving drains.
Most of the improvements will be done by Maintenance.
PRN-00505 was approved by the Clearinghouse for safety improvements.
MP-669 was approved by the Clearinghouse regarding equipment access
and platform installation.
Gas Handling System – Gas compressor system is aging and
needs replacement of major units.
J-124 – Digester Gas Facilities rehabilitation in
Gas compressors repair and gas compressor overhaul by Maintenance.
Gas Dryer – Out of service. Currently, gas goes through a heat
exchanger and condensate drop out. The gas dryer refrigerator system will be replaced by J-124 Project.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
J-124 Digester Gas Facilities Rehabilitation Gas compressors, dryers, and flares Replace the entire gas handling system including the gas
compressor building.
MP-659 New Floor and Equipment Drains for the
Truckloading Basement Truckloading Facility Improving the drainage in the basement.
P1-101 Sludge Dewatering and Odor Control at
Plant No. 1
Thickening centrifuges, dewatering
centrifuges and odor control
Construction of new thickening and dewatering and odor control
facility and major rehabilitation of truck loading facility.
FE 16-06 Fuel Cell Facilities Demolition None Demolition of concrete pads, pavement and buried utilities.
PRN-00505 Safety Improvements at the Thickening and
Dewatering Building Thickening and Dewatering Building Improving safety outside of the thickening and dewatering building.
MP-669 Truckloading and silo's slide frame
conveyor motor platform Truckloading slide frame Improve access to the equipment for maintenance activities.
Acronym Key:
CIP=Capital Improvement Program; FY=Fiscal Year
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
63
Acronym Key:
HVAC=Heating, Ventilation, and Air Conditioning; Inst.=Instrument; OXI=Oxidizer; RUL=Remaining Useful Life;
SCR= Selective Catalytic Reduction
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 16 – PLANT NO. 1 CENTRAL GENERATION
Process Schematic
Major Assets
Major Assets Remaining Useful Life
Asset Type
En
g
i
n
e
G
e
n
e
r
a
t
o
r
#
1
En
g
i
n
e
G
e
n
e
r
a
t
o
r
#
2
En
g
i
n
e
G
e
n
e
r
at
o
r
#
3
Ab
s
o
r
p
t
i
o
n
C
h
i
l
l
e
r
#
1
Ab
s
o
r
p
t
i
o
n
C
h
i
l
l
e
r
#
2
De
a
e
r
a
t
o
r
V
e
s
s
e
l
He
a
t
R
e
c
o
v
e
r
y
B
o
i
l
e
r
#
1
He
a
t
R
e
c
o
v
e
r
y
B
o
i
l
e
r
#
2
He
a
t
R
e
c
o
v
e
r
y
B
o
i
l
e
r
#
3
OX
I
C
a
t
a
l
y
s
t
SC
R
C
a
t
a
l
y
s
t
Ur
e
a
I
n
j
e
c
t
i
o
n
S
y
s
t
e
m
St
a
r
t
i
n
g
A
i
r
C
o
m
p
r
e
s
s
o
r
#
1
St
a
r
t
i
n
g
A
i
r
C
o
m
p
r
e
s
s
o
r
#
2
In
s
t
.
A
i
r
C
o
mp
r
e
s
s
o
r
#
1
In
s
t
.
A
i
r
C
o
m
p
r
e
s
s
o
r
#
2
Ba
t
t
e
r
y
B
a
c
k
u
p
Bu
i
l
d
i
n
g
E
l
e
v
a
t
o
r
Pl
a
n
t
W
a
t
e
r
P
i
p
i
n
g
Mi
s
c
e
l
l
a
n
e
o
u
s
Structural
Buildings - - - - - - - - - - - - - - - - - - 5 1
Mechanical
General 4 4 4 3 3 2 3 3 3 3 3 3 5 5 5 5 - 5 - -
HVAC - - - - - - - - - - - - - -
- - - - - 3
Lube Oil System 3 3 3 - - - - - - - - - - - - - - - - -
Electrical
General 4 4 4 - - - - - - - - 3 3 3 3 5 5 5 - -
Switchgear 4 4 4 - - - - - - - - - - -
- - - - - - -
Instrumentation
General 5 5 5 3 3 3 3 3 3 3 3 3 4 4 5 5 5 5 - -
Major Assets Quantities
Engine Generator
Gas Engine (12 Cylinder) 3
Electrical Generator 3
Engine Lube Oil System 3
Cooling System
Absorption Chiller 2
Deaerator Vessel 1
Major Assets Quantities
Engine Emission Control
OXI Catalyst 3
SCR Catalyst 3
Urea Injection System 3
Heat Recovery System
Heat Recovery Boiler 3
Major Assets Quantities
Building
Elevator 1
Piping Various
HVAC
Ventilation Exhaust Fans 5
Major Assets Quantities
Air Compressors
Engine Starting Air 2
Instrument Air 2
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
64
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 16 – PLANT NO. 1 CENTRAL GENERATION
Key Issues
Key Issues Actions and Recommendations
Gas Engine Generator Reliability – Monies shall be spent to address
aging components and systems required to operate the Central Generation
Engines.
Engine Overhauls (ongoing).
Replace obsolete systems (i.e. Battery Backup, Switch Gear, etc.).
Engine Lube Oil System – The Lube Oil Centrifuges are no longer
operational. Install new instrumentation and controls onto the existing 2 units.
Plant Water Piping – The plant water (i.e., Cooling Water) piping has
degraded and is in need of replacement. Replace all plant water piping in the basement of Central Generation.
Emission Control System – The Housings on the Oxidizer Catalysts are
failing prematurely. Analyze existing deficiencies and design new Catalyst Housings.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
35
P1-127 Central Generation Rehabilitation Central Generation Facility Wide Rehabilitation of Gas Engine Support Systems.
FE17-03 Battery Storage System Plant Wide Install batteries for electricity storage purposes.
X-077 Switch Gear Replacement Engine Generator Install new Switch Gear for the engines.
FE19-02 Plant Water Pipe Rehabilitation Plant Water Piping Replace existing plant water piping with new.
PRN-00211 Engine Lube Oil System Controls Upgrade Engine Generator Install new instrumentation and controls onto the existing oil
centrifuge units.
MP-187 Public Address System Rehabilitation Central Generation Facility Replace the Public Address System at the Central Generation
Facility.
MP-227 Starting Air Compressor System
Rehabilitation Starting Air Compressor System Rehabilitation of the Air Compressors.
PRN-00248 Engine Overhauls Engine Generator Overhaul the engines as needed (ongoing).
PRN-00283 Elevator Rehabilitation Building Elevator Rehabilitate the existing elevator.
PRN-00322 Lube Oil Filter Catwalk Engine Generator Install Lube Oil Filter catwalks for maintenance purposes.
MP-608 Engine Ignition and Controls Upgrade Engine Generator Replace the existing engine ignition, controls, and fuel system.
PRN-00525 Battery Backup Rehabilitation Battery Backup Replace the existing backup batteries for the switch gear.
Acronym Key:
CIP=Capital Improvement Program; FY=Fiscal Year
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
65
Major Assets
Acronym Key:
RUL= Remaining Useful
Life;
PLC=Programmable Logic
Controller
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 17 – PLANT NO. 1 UTILITIES
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Ci
t
y
W
a
t
e
r
Sy
s
t
e
m
Pl
a
n
t
W
a
t
e
r
Sy
s
t
e
m
Re
c
l
a
i
m
e
d
Wa
t
e
r
P
i
p
i
n
g
Pl
a
n
t
A
i
r
Sy
s
t
e
m
s
Civil
Piping 3 3 2 -
Structural
Pump Station 1 3 - -
Tanks 3 - - -
Mechanical
Pumps 3 3 - -
Strainers - 3 - -
Compressors - - - 5
Ventilation System 2 3 - -
Electrical
Motor Control Centers 1 2 - -
Variable Frequency Drives 3 1 - -
Instrumentation
PLCs, Flowmeters 1 1 - 1
Major Assets Quantities
City Water
Pumps 7
Tanks 3
Piping 10.6 Miles
Plant Water
Pumps 4
Strainers 3
Piping 12.5 Miles
Reclaimed Water
Piping 5.4 Miles
Plant Air
Compressors 4
Plant Air Piping 4 Miles
Instrument Air Piping 3.5 Miles
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
66
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 17 – PLANT NO. 1 UTILITIES
Key Issues
Key Issues Actions and Recommendations
Plant/Instrument Air Lines – Severe
corrosion issues.
Current plan is to run to fail and repair the lines as they fail. In addition, if opportunity arises through future
CIP or FE projects within areas where known air system deficiencies exist, we will address them at the time.
City Water Pump Station – Pumps
are possibly undersized.
The three medium pumps at the City Water Pump Station continuously run causing excessive wear. There
are 1 smaller jockey pumps that run very infrequently. Study is needed to properly size the pumps at the
station to meet the current needs of the plant.
Reclaimed Water System – This
system needs a pressure regulating
valve installed.
Reclaimed water is meant to be a back up to plant water and to provide necessary support to Central
Generation. When the pressure on the plant water side drops, the plant becomes in need of reclaimed water
to compensate for the loss. Currently, the reclaimed water pressure varies between 100psi to 130psi,
depending on the operational conditions at OCWD. OCSD plant water is at 80 psi, so with the current valves,
reclaimed water with the higher psi tends to replace plant water, even when we are not in need. This causes
unnecessary reclaimed water charges. Installing a pressure regulating valve at the OCWD/OCSD reclaimed
water connection point will help reduce unnecessary charges and better manage our reclaimed water usage.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
20
FY
20
/21
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FE15-07 Secondary Treatment and Plant Water
Variable Frequency Drive Replacement Plant Water Pump Station Replace Variable Frequency Drives at the Plant Water Pump
Station.
FE18-06 Instrument Air Compressors at Central
Generation Central Generation Replace Instrument Air compressors at Central Generation.
P1-105 Headworks Rehabilitation and Expansion City Water Pump Station Refeed city water pumps from new power building and replace
current compressor at headworks with 2 new compressors.
FE18-20 Blower Building Compressor Replacement Blower Building Replace current compressor with 2 new compressors.
P1-126 Primary Clarifier Replacement and
Improvement Primary Clarifier Address plant water pipes near primary clarifiers.
X-038 City Water Pump Station Replacement City Water Pump Station Rehabilitate City Water Pump Station.
X-039 Plant Water Pump Station Rehabilitation Plant Water Pump Station Rehabilitate Plant Water Pump Station.
FE-XX1 Dissolved Air Flotation Thickeners Air
Compressor Replacement Dissolved Air Flotation Thickeners Relocate existing 100 HP Air Compressor.
FE-XX2 Plant Water Piping Replacement Activated Sludge: Train 1 Replace portions of the plant water piping near Activated
Sludge Plant No. 1.
PRN-00518 Air Compressor replacement Headworks Headworks Replace in kind compressor at headworks (100 HP).
PRN-00568 Air Compressor replacement Blower
Building Blower Building Replace in kind compressor at blower building (60 HP).
Acronym Key:
CIP=Capital Improvement Program; FE= Facilities Engineering; FY=Fiscal Year; HP=Horsepower;
OCSD=Orange County Sanitation District; OCWD=Orange County Water District
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
67
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 17 – PLANT NO. 1 UTILITIES
Remaining Useful Life of Utility Infrastructure
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
Acronym Key:
RUL=Remaining Useful Life
68
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 17 – PLANT NO. 1 UTILITIES
Remaining Useful Life of Utility Infrastructure
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
Acronym Key:
RUL=Remaining Useful Life
69
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 18 – PLANT NO. 1 ELECTRICAL DISTRIBUTION
Process Schematic
Major Assets
Major Assets Remaining Useful Life
Asset Type
Se
r
v
i
c
e
Ce
n
t
e
r
CE
N
G
E
N
PB
-2
PB
-3A
PB
-4
PB
-5
PB
-6
PB
-7
PB
-8
PB
-9
DA
F
BB
-1
BB
-2
Tier I – 12.47kV Primary Distribution Level
Transformers: 12.47/4.16kV - - - - - - - - - 4 1
Transformers: 12.47/0.48kV 1 4 2 2 4 1 4 1 1 1 3 4 1
12.47kV Switchgears 3 4 4 4 4 4 4 - - - - 1
12.47 kV Transfer Switchers 4 - - - - - - - -
12.47 kV Level Indicator
Switches - - 4 4 4 - - 1 1 1 3 4
12.47kV Feeders 1 4 4 4 4 4 4 1 1 1 4 4 1
Tier II – 4.16kV Distribution Level
4.16kV Switchgears - - - - - - - - - - - 4 1
4.16kV Feeders - - - - - - - - - - - 4 1
Tier IV – 480V Distribution Level
480V Switchgears - 4 2 2 - 2 4 1 1 1 3 4 1
Transfer Switches - - 2 2 4 - 2 - - - 4 4 1
Generators - - 5 5 5 - - 1 1 - - 5 -
Tier V – Uninterruptible Power Supply
UPSs Individual - 5 - 5 - 3 - 3 2 3 3 3
Tier VI – 125 VDC and 24 VDC Battery Systems
125VDC Chargers 5 5 5 5 3 3 3 3 2 3 - 3
125VDC Batteries 5 5 5 5 3 3 3 3 2 3 - 3
24VDC Chargers - 5 5 5 5 - - 3 3 - - 3 -
24VDC Batteries - 5 5 5 5 - - 3 3 - - 3 -
Generator Controls
Generator Controls - 5 5 5 5 - - 1 1 - - 5 -
Major Assets Quantities
Transformers 35
Standby Generators 8
12kV Switchgears 19
480V Switchgears 5
125VDC and 24VDC
Battery Systems 22
UPS 25
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
Acronym Key:
BB=Blower Building;
CENGEN=Central
Generation;
kV=Kilovolt;
PB=Power Building;
RUL=Remaining Useful
Life;
VDC=Volts of Direct
Current;
UPS=Uninterruptible
Power Supply
70
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 18 – PLANT NO. 1 ELECTRICAL DISTRIBUTION
Key Issues
Key Issues Actions and Recommendations
Standby Generators
- Power Building 2, &3A: Overheating at 75%-80% loading.
- Power Building 4: Engine unable to drive the generator at 100% loading.
- Blower Building 1: Shut down on high temp. at 100%, cannot synchronize both generators.
P1-105 will install centralized standby system with (4)-2500kW, 12kV diesel generators for Headworks Area, Power
Building 2, 5 and Blower Building standby loads. P1-105 will demolish generators at Power Building 3A. P1-126 will
demolish Power Building 4 Generator and re-feed standby loads from Power Building 8. Future Projects will design
feeders from new generators to Power Building 2 and Blower Building 1 Standby Loads.
Battery Chargers and Batteries – Aging. MP-233: Monitor existing battery life, develop path forward for replacing aged battery and charger systems.
Cabling – Aging medium voltage cabling infrastructure. MP-320: Testing aging Medium Voltage Cabling to perform Condition Assessment and develop plan for preventive
maintenance.
Variable Frequency Drive – Obsolescence. Identified obsolete Variable Frequency Drive. Proceed with Variable Frequency Drive Replacement Strategy
Power Building 2 –Seismic issues. Plan to transfer Power Building 2 Loads to T&D Building and demo the building. Consider feeding Power Building 2
standby loads from future Blower Building standby power.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
MP-233 P1 and P2 Battery
System Upgrade Plant No. 1 Power Distribution Battery Systems are old and in need of refurbishment. The Project will look into replacing old
batteries and chargers.
MP-320 P1 Medium Voltage
Cable PM Services Plant No. 1 Power Distribution Medium Voltage Cables Condition Assessment and Testing.
MP-
666,667,668
Obsolete Variable
Frequency Drive
Replacement Strategy
Plant No. 1 Power Distribution Replacement of obsolete Variable Frequency Drive at Plant No. 1.
FE17-03 Battery Storage System
at P1 Plant No. 1 Power Distribution Project will arrange for installation, operation, maintenance, and management of behind- the-
meter battery energy storage system at Plant No. 1 to reduce peak electrical demand chargers.
P1-126
Primary Clarifiers
Replacement and
Improvements at P1
Plant No. 1 Power Distribution Demolish Power Building 4 Diesel Generator, re-feed standby loads from Power Building 8.
X-077 P1 Central Generation
Switchgear replacement
Plant No. 1 Central Generation
Switchgear Replacement
Project will replace existing 12.47kV Central Generation Switchgear, install new 12.47kV
Feeder from Electrical Service Center to Central Generation. Install new 12.47kV feeders from
Central Generation to Dissolved Air Flotation and Blower Building 1.
P1-105 P1 Headworks
Rehabilitation
Plant No. 1 Power
Distribution/Headworks
Project will rehabilitate and upgrade facilities at the Plant No. 1 Headworks. Project will install
(3) new Electrical Power Buildings: Power Building 3, Standby Power Electrical Building and
Headworks Electrical Building. Project will install new centralized standby generator system; (4)
2500kW Generators.
X-038 City Water Pump Station
Rehabilitation at P1
Plant No. 1 Power
Distribution/Mechanical
Equipment/Instrumentation
Project will retrofit the building, replace HVAC, replace electrical distribution equipment and
control equipment, such as transformers, switchgears, MCCs, VFDs, and surge arrestors.
P1-132 UPS Improvement at P1 Plant No. 1 Power
Distribution/UPS Systems
Project will install new regional UPS at Power Building 8 to provide critical power to facilities
northwest region of the plant. New electrical distribution and branch circuits panelboards will
replace existing old and obsolete equipment.
J-98
Electrical Power
Distribution
Improvements
Plant No. 1 & Plant No. 2 Power
Distribution
Project provides various electrical distribution system improvements at Plant No. 1 and Plant
No. 2 as recommended by J-25-4 Study.
Acronym Key:
CIP=Capital Improvement Program; FE= Facilities Engineering; FY=Fiscal Year;
HVAC=Heating, Ventilation, and Air Conditioning; kV=Kilovolt; kW=Kilowatt; MCC=Motor Control Center; P1=Plant No. 1;
P2=Plant No. 2; T&D=Thickening and Dewatering; VFD=Variable Frequency Drive; UPS=Uninterruptible Power Supply
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
71
5.2.2 Plant No. 2 Asset Management
Summaries
72
This page is intentionally left blank.
73
Major Assets
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 20 – PLANT NO. 2 PRELIMINARY TREATMENT
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Headworks
Tr
u
n
k
l
i
n
e
O
d
o
r
Co
n
t
r
o
l
He
a
d
w
o
r
k
s
O
d
o
r
Co
n
t
r
o
l
Me
t
e
r
i
n
g
&
Di
v
e
r
s
i
o
n
Ba
r
S
c
r
e
e
n
s
Ma
i
n
S
e
w
a
g
e
Pu
m
p
Gr
i
t
B
a
s
i
n
s
Sp
lit
t
e
r
&
Me
t
e
r
in
g
Civil
Effluent Piping - - - - 3 - -
Structural
Building - 1 1 1 - - -
Concrete & Tanks 1 1 1 1 1 1 1
Mechanical
Piping & Valve 1 1 1 1 1 - -
Pump - - 1 2 - 2 2
Screening Washer Compactor - 3 - - - - -
Grit Cyclone/ Classifier - - - 2 - - -
Conveyor - 2 - 2 - - -
Fans & Blower - - - - - 2 2
Control Gate 2 2 2 2 2 - -
Heating, Ventilation & Air
Conditioning - 2 2 2 - - -
Crane - 1 1 - - - -
Electrical
Process – Motor, MCC, VFD 2 2 4 2 2 2 2
Instrumentation
PLCs, Flow Meters 2 2 2 2 2 2 2
Major Assets Quantities
Metering & Diversion Structure
Influent Flow Meter 4
Control Gate 7
Trunk Odor Control
Supply Fan 3
Biotower 3
Recirculation Pump 6
Major Assets Quantities
Bar Screens
Bar Screen 6
Screening Washer
Compacter 3
Screenings Conveyor 4
Control Gate 14
Major Assets Quantities
Main Sewage Pump
Pump 7
Control Gate 16
Splitter and Metering
Flow meter 3
Control Gate 26
Major Assets Quantities
Grit Basins
Grit Basins 6
Grit Slurry Pump 6
Grit Cyclone/ Classifier 4
Control Gate 12
Major Assets Quantities
Headworks Odor Control
Supply Fan 21
Biotower 13
Chemical Scrubber 8
Recirculation Pump 42
Bleach Tank 1
Bleach Pump 16
Major Assets Quantities
Headworks Odor Control
(Continued)
Acid Tank 1
Acid Pump 2
Caustic Tank 1
Acronym Key:
MCC=Motor Control
Center;
PLC= Programmable Logic
Controller;
RUL=Remaining Useful
Life;
VFD=Variable Frequency
Drive
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
74
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 20 – PLANT NO. 2 PRELIMINARY TREATMENT
Key Issues
Key Issues Actions and Recommendations
Headworks Low Voltage Cable– There are 480V cables and circuits that are currently
grounded, causing ground faults on 480 volt equipment. Last incident happened in July 2019,
when the Grit Classifier A was lost due to the ground fault. Due to the complexity of the repair
job and its impact to operations, need to develop a replacement plan for known failed cables.
880E located a spare wire for the Grit Classifier A and put back in service.
PRN-00409 P2 Headworks 480V Grounded Cable Repair was approved by the Clearinghouse to do the engineering
design in-house and bid for service contract for repairs on damaged cables. The bid was awarded and will be
presented to the December board for approval.
Main Sewage Pump System – P2-122 Headworks Modifications at Plant No. 2 for GWRS
Final Expansion will replace 3 of 7 MSP pumps, but use the existing VFDs and Motors. They
are due for overhaul to ensure that they continue to be reliable during and beyond the P2-122
construction. Also, current vibration monitoring system, which is Emerson CSI 4500, for MSP
is obsolete and no longer supported after this year.
Variable frequency drives are halfway through their anticipated life cycle, so PRN-00528 P2 MSP Variable Frequency
Drive Year 10 Preventative Maintenance was approved by the Clearinghouse to perform Year 10 Preventative
Maintenance on the drives by the original equipment manufacturer.
PRN-00529 Plant No. 2 MSP Motor Overhaul was approved by the Clearinghouse to have the motors overhauled in
the motor shop
Recommend replacing the obsolete vibration system with GE Bently Nevada since the District plans to standardize
the vibration monitoring system.
Headworks – Asset life of P2-66 Headworks is relatively new, since it was completed in
2012. No condition assessment has been done in the past. There is a need to perform
condition assessment at the Headworks to build a condition baseline.
With P2-122 construction starting next year, area engineer will coordinate with the project team and Operation and
Maintenance to conduct condition assessments on areas that will be down for the construction.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
P2-122 Headworks Modifications at Plant No. 2 for
GWRS Final Expansion Headworks
Modify headworks and sidestream routing to create reclaimable and non-
reclaimable trains to support GWRS Final Expansion.
Replace 3 of 7 MSPs with more efficient lower capacity pumps.
PRN-00409 Plant No. 2 Headworks 480V Grounded
Cable Repair Headworks In-house engineering design, and bid for service contract for repairs.
PRN-00528 Plant No. 2 MSP VFD Year 10 PM MSP Refurbish all 7 MSP VFDs by performing Year 10.
PRN-00529 Plant No. 2 MSP Motor Overhaul MSP Overhaul all 7 MSP motors in the motor shop.
PRN-00561 Plant No. 2 MSP Vibration System
Modernization MSP Modernize obsolete MSP vibration system.
Replace and install new vibration sensors on pumps.
FE18-11 Headworks Explosive Gas Monitoring
Systems at Plant No. 2 TL & HW Odor Control Install an Early Warning System to provide early indication of combustible gas
at the influent of the plant.
FE18-17 Trunkline Sampler Power Feed at Plant No. 2 Trunkline Provide 120V power for four automated samplers at 4 trunkline sample
collection points.
MP-699 Plant No. 2 Trunkline Biotower #3 Repair TL Odor Control Repair internal mechanism of the Biotower #3 vessel.
N/A Plant No. 2 Biotower Media Replacement TL & HW Odor Control Replace biotower media of 16 biotowers.
N/A Plant No. 2 Chemical Scrubber Media
Replacement HW Odor Control Replace scrubber media of 8 chemical scrubbers.
X-030 Plant No. 2 Headworks Rehabilitation Headworks Rehabilitate any equipment, electrical, structures, or materials that cannot
provide 25 years of useful life.
Acronym Key:
CIP=Capital Improvement Program; FY=Fiscal Year; GWRS=Groundwater Replenishment System;
HW=Headworks; MSP=Main Sewage Pump; N/A= Not Applicable; PM=Preventative Maintenance;
TL=Trunkline; V=Volts; VFD=Variable Frequency Drive
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
75
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 21 – PLANT NO. 2 PRIMARY TREATMENT
Process Schematic
Major Assets
Major Assets Quantities
Primary Basin
Primary Basin 4
Sludge/ Scum Collectors 4
Sludge/ Scum Pump 8
Supply Fan 6
B-Side
Primary Basin 5
Sludge/ Scum Collectors 5
Sludge/ Scum Pump 10
Supply Fan 7
Major Assets Quantities
C Side
Primary Basin 5
Sludge/ Scum Collectors 5
Sludge/ Scum Pump 10
Supply Fan 8
North Scrubber Complex
Chemical Scrubber 7
Biofilter 1
Recirculation Pump 16
Supply Fan 8
Caustic Tank 1
Major Assets Quantities
North Scrubber Complex (Continued)
Acid Feed Pump 2
Bleach Tank 1
Bleach Feed Pump 14
Caustic Feed Pump 16
Acid Tank 1
South Scrubber Complex
Supply Fan 4
Scrubbers 4
Recirculation Pump 8
Caustic Tank 1
Major Assets Quantities
South Scrubber Complex (Continued)
Caustic Feed Pump 8
Acid Tank 1
Acid Feed Pump 2
Bleach Tank 1
Bleach Feed Pump 2
Polymer System
Polymer Bulk Tank 3
Polymer Bulk Transfer
Pump 4
Polymer Mix Tank 2
Major Assets Quantities
Polymer System (Continued)
Polymer Feed Pump 4
Ferric System
Ferric Bulk Tank 2
Ferric Feed Pump 6
Distribution Boxes
Structure 3
Sluice Gates 24
Waste Sidestream Pump Station C
Waste Sidestream Pump 4
Asset Type
A-Side B-Side C-Side
NS
C
SS
C
Po
l
y
m
e
r
S
y
s
t
e
m
Fe
r
r
i
c
S
y
s
t
e
m
Di
s
t
r
i
b
u
t
i
o
n
B
o
x
WS
S
P
S
-C
PB
-D
PB
-E
PB
-F
PB
-G
PB
-H
PB
-I
PB
-J
PB
-K
PB-L
PB
-M
PB
-N
PB
-O
PB
-P
PB
-Q
Civil
Effluent Piping 3 3 3 3 3 3 3 3 3 3 3 3 3 3 - - - - - 2
Structural
General 4 4 3 3 4 3 3 3 3 3 2 2 2 2 3 3 3 2 3 1
Dome 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - - - - - -
Mechanical
Piping 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 - 2 3 2
Internal Mechanism 5 5 3 3 5 3 3 3 3 4 5 3 4 4 - - - - - -
Fans & Pumps 3 3 3 3 3 3 3 3 3 3 2 - 4
HVAC & Ventilation 2 2 2 2 2 2 2 - - - - - -
Gates - - - - - - - - - - - - - - - - - - 3 -
Electrical
Process – Motor, MCC, VFD 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 - 3
Instrumentation
PLC, Flow Meters 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 2 - 3
Acronym Key:
HVAC=Heating, Ventilation, and Air Conditioning; MCC=Motor Control Center; NSC=North Scrubber Complex;
PB=Power Building; RUL=Remaining Useful Life; SSC=South Scrubber Complex; VFD=Variable Frequency Drive;
WSSPS=Waste Sidestream Pump Station
Major Assets Remaining Useful Life
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
76
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 21 – PLANT NO. 2 PRIMARY TREATMENT
Key Issues
Key Issues Actions and Recommendations
Reliability of Primary Basins – Due to its age, basins have
corroded internal mechanism issues, and Basin D, E, H, I, and N
are not currently operational. With wet weather officially begins in
October 15th, at least two basins need to be back in service,
bringing the total available to 11 basins. With existing A-Side basins
being demolished and replaced with new basins, B/ C side of basins
need to be stay reliable for 10 years to support P2-98A
construction.
Basins D, E, H, and I are down for repair through P2-98B B & C Side Interim
Repair. Basin N is down due to the imbalance of the sweep arm. Basin N is
scheduled to be assessed by OEM of internal mechanism to identify addition
scope needed to put the basin back in service.
MP-692 P2 Primary Basin N Repairs is in place to cover additional items
beyond P2-98B scope.
P2-98A and P2-133 are in place to provide long term solutions to all A, B, & C
side of primary clarifiers.
Reliability of Waste Sidestream Pump Station C – Waste
sidestream pumps and their associate equipment show accelerated
corrosion issue due to the drains from the South Scrubber Complex.
The South Scrubber Complex uses bleach for their scrubbers and
the bleach pumps are oversized and do not have good turndown
ratio. Excessive bleach goes to the drains that go to the WSSPS-C.
The materials are not compatible with bleach, resulting accelerated
corrosion.
MP-420 Plant No. 2 South Scrubber Complex Bleach Pump is in place to
replace oversized bleach pump with smaller sized pump with better turndown
capacity. This will reduce excess bleach that flows to the WSSPS-C.
Two failed pumps (5HP and 35HP) are sent out for root cause failure analysis
and will be replaced with improved design.
X-054 WSSPS-C Rehabilitation at Plant No. 2 is in place to address corroded
equipment caused by replacing equipment with upgraded material.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
P2-98A A-Side Primary Clarifiers Replacement at
Plant No. 2 A Side Primary Basins Demolish and replace four existing A-Side Primary Basins.
Demolish and replace the South Scrubber Complex.
P2-98B B/C Side Primary Clarifiers Interim Repair at
Plant No. 2 B & C Side Primary Basins
Repair the structural steel mechanism members of 12 primary
basins.
Interim repairs to make basins reliable for 10 years during P2-98A
construction.
P2-133 B/C Side Primary Clarifiers Rehabilitation at
Plant No. 2 B & C Side Primary Basins Long term repairs to extend remaining useful life of B & C side
basins to 40 years or greater.
PRN-00306 Plant No. 2 Primary Clarifier D & E Repairs Primary Basin D & E Interim repairs for Primary Basin D & E to extend the lifecycle by 8-
10 years. Added to P2-98B scope.
MP-692 Plant No. 2 Primary Clarifier N Repairs Primary Basin N Identify and repair items not covered in P2-98B scope to make the
basin operable for next 10 years.
MP-420 Plant No. 2 South Scrubber Complex Bleach
Pump South Scrubber Complex Replace existing bleach pumps with higher turndown capable
pump to reduce excess bleach usage.
X-054 Waste Sidestream Pump Station C
Rehabilitation at Plant No. 2 Waste Sidestream Pump Station C Replace pumps and associated equipment with chemical resistant
material to provide reliable operation.
Acronym Key:
CIP=Capital Improvement Program; FY=Fiscal Year; HP=Horsepower;
OEM=Original Equipment Manufacturer; WSSPS=Waste Sidestream Pump Station
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
77
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 22 – PLANT NO. 2 SECONDARY TREATMENT – ACTIVATED SLUDGE
Process Schematic
Major Assets
Major Assets Remaining Useful Life
Asset Type
PE
P
S
Ae
r
a
t
i
o
n
Ba
s
i
n
s
Se
c
o
n
d
a
r
y
Cl
a
r
i
f
i
e
r
s
A-L
SE
J
B
Ea
st
R
A
S
/W
A
S
PS
We
s
t
RA
S
/W
A
S
PS
Ox
y
g
e
n
Fa
c
i
li
t
y
DA
F
T
s
A
-D
DA
F
T
s
Po
l
y
m
e
r
Sy
s
t
e
m
DA
F
T
s
Od
o
r
Co
n
t
r
o
l
WS
S
P
S
Civil
Effluent Piping 2 - 3 3 4 4 - - - - 4
Structural
Building 2 - - - 2 2 - 1 - - -
Structure 2 4 3 3 - - - 1 1 1 -
Mechanical
Pump 2 - - - 3 3 - 2 2 - 3
Aerator - 4 - - - - - - - - -
Piping and Valve 3 3 3 3 3 3 3 2 2 3 3
Clarifier/DAFT Moving
Mechanism - - 5 - - - - 2 - - -
Channel Air Blower - - - - - 4 - - - - -
Control Gate - 3 4 3 - - - - - 2 -
LOX Facility - - - - - - 3 - - - -
HVAC & Ventilation 2 - - - 3 3 - - - - -
Crane 3 - - - - - - - - - -
Electrical
MCC & VFD 4 3 3 - 4 4 - 3 3 3 3
Instrumentation
PLC & Flow Meter 3 3 3 - 3 3 3 3 3 - 3
Major Assets Quantities
Primary Effluent Pump Station
Building 1
Structure 1
Pumps 4
Aeration Basins
Basins 8
Surface Aerators 32
Inlet gates 8
Major Assets Quantities
Secondary Clarifiers A-L
Basins 12
Inlet gates 36
Sludge collectors 24
Secondary Effluent Junction Box
Structure 1
Control Gate 1
East RAS/WAS PS
RAS/WAS Pumps 5
Major Assets Quantities
West RAS/WAS PS
RAS Pumps 3
WAS Pumps 2
Channel air blowers 2
Sliding Frames 2
Oxygen Facility
LOX Storage Tanks 2
Vaporizer 6
Oxygen Purging Fan 2
Major Assets Quantities
DAFTs A-D
Concrete Tanks 4
Mechanical Sweep 4
Recycle Pumps 6
Saturation Tank 4
TWAS Pumps 8
DAFTs Polymer System
Storage Tank 1
Aging Tank 2
Major Assets Quantities
DAFTs Polymer System (Continued)
Storage Tank Rec. Pumps 2
Blend Pumps 2
Feed Pumps 6
DAFTs Odor Control
Biofilters 3
Foul Air Fans 3
Waste Sidestream Pump Station
Pumps 3
Acronym Key:
DAFT=Dissolved Air Flotation Thickener; LOX=Liquid oxygen; MCC=Motor Control Center;
PEPS=Primary Effluent Pump Station; PLC=Programmable Logic Controller; PS=Pump Station;
RAS=Return Activated Sludge; RUL=Remaining Useful Life; SEJB=Secondary Effluent Junction Box;
TWAS= Thickened Waste Activated Sludge; VFD=Variable Frequency Drive; WAS=Waste Activated Sludge;
WSSPS=Waste Sidestream Pump Station
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
78
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 22 – PLANT NO. 2 SECONDARY TREATMENT – ACTIVATED SLUDGE
Key Issues
Key Issues Actions and Recommendations
PEPS – Obsolete VFD parts
Missing flapper gates on the area drains inlets to the
basins
PRN-00573 (MP-513) project will replace the PEPS VFDS
Condition assessment will be performed to determine the condition
Aeration Basins– Cracks and concrete spalling on
aeration basins deck
Aerator motor corrosion and vibration
P2-118 filled the cracks on west side, and the remaining work will be included in P2-123
contract
Maintenance have been rebuilding the gearbox, the motor base, and replacing the motor
X-050 will overall rehab. the aeration basins
Clarifiers– Broken clarifier mechanism need to be
repaired or replaced
Corroded Inlet gates need to be replaced
Broken Area lights
MP-248 will replace D, L, G, J, C, F), and the remaining six will be replaced by another MP
MP-638 Will replace all the 36 inlet gates
P2-123 will replace all the lights
RAS/WAS Pump Stations – Obsolete VFDs
Corroded RAS piping
PRN-00573 (MP-513) will replace the RAS and WAS VFDs
P2-123 will replace the RAS piping
Oxygen Facility - LOX Tank A out of service due to
leaking flange Operation is working on a contract to repair the LOX tank
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
MP-248 Plant No. 2 Secondary Clarifiers D, G, L, J,
F, C Repairs Secondary clarifiers Replace the six clarifiers moving mechanisms.
PRN-00457 Activated Sludge Plant Clarifier Inlet Gate
Replacement at Plant No. 2 Secondary clarifiers Replace all the 36 inlet gates with stainless steel gates.
P2-122 P2-122 - Headworks Modifications at Plant
No. 2 for GWRS Final Expansion AS plant, WSSPS
Separate the reclaimable and non-reclaimable streams. AS Plant
will treat non-reclaimable flow. WSSPS discharge piping to primary
basins will be demolished and be directed to PEPS.
P2-123 Return Activated Sludge Piping
Replacement at Plant No. 2
RSS pump stations and
secondary clarifiers
Replace RAS piping, area lights and fix the concrete cracks and
spalling on east aeration basin decks.
PRN -00573
(MP-513)
Plant No. 1, Plant No. 2, Collections VFD
Drives Replacement PEPS, RSS pump stations Replace PEPS, RAS and WAS VFDs
X-50 Activated Sludge Aeration Basin Rehab. at
Plant No. 2 AS plant aeration basins Rehabilitate the AS process.
X-52
Activated Sludge
RAS/WAS/PEPS/Vaporizers Rehabilitation
at Plant No. 2
AS plant Rehabilitate the RAS/WAS/PEPS/LOX vaporizers.
PRN-00572 Plant No. 2 AS Plant Clarifiers
Rehabilitation - Phase 2 Secondary clarifiers Replace Clarifiers A, B, E, G, H, L moving mechanism.
Acronym Key:
AS= Activated sludge; CIP=Capital Improvement Program; FY= Fiscal Year;
GWRS=Groundwater Replenishment System; LOX=Liquid Oxygen; PEPS=Primary Effluent Pump Station;
RAS=Return Activated Sludge; RSS= Return secondary sludge; VFD=Variable Frequency Drive;
WAS=Waste Activated Sludge; WSSPS=Waste Sidestream Pump Station
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
79
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 22 - PLANT NO. 2 SECONDARY TREATMENT – TRICKLING FILTERS
Process Schematic
Major Assets Remaining Useful Life
Asset Type
TF
P
S
&
E
l
e
c
Ro
o
m
Tri
c
k
l
i
n
g
Fi
l
t
e
r
s
A
-C
Sol
i
d
s
C
o
n
t
a
c
t
&
M
L
Ch
a
n
n
e
l
Bl
o
w
e
r
/ WSS
PS
Bu
i
l
d
i
n
g
Se
c
o
n
d
a
r
y
Cl
a
r
i
f
i
e
r
s
A-F
RS
S
P
S
A
RS
S
P
S
B
RS
S
P
S
C
&
El
e
c
.
R
o
o
m
DC
J
Od
o
r
C
o
n
t
r
o
l
Fa
c
i
l
i
t
y
Ch
e
m
i
c
a
l
Fa
c
i
l
i
t
y
Civil
Effluent Piping 2 2 2 2 2 2 2 2 - 2 2
Structural
Building 1 - - 1 - 1 1 1 - -
Structure 1 1 1 - 1 - - - - 2 2
Mechanical
Pump 4 - - 2 2 2 2 2 - 2 3
TF Rotary Distributor - 2 - - - - - - - -
TF Media - 3 - - - - - - - -
Clarifier Sludge Collector - - - - 3 - - - - - -
Blower & Fan - 2 - 2 - - - - - 2 -
Control Gate - 3 3 3 3 - - - - - -
Piping and Valve 2 2 2 2 2 2 2 2 - 2 2
Diffusor - - 2 - - - - - - - -
HVAC & Ventilation 2 - - 2 - 2 2 2 2 - -
Crane 2 - - 2 - 2 2 2 - - -
Electrical
MCC & VFD 3 3 - 3 3 - - 3 3 3 3
Instrumentation
PLCs & Flow Meters 3 3 - 3 3 3 3 3 3 3 3
Major Assets
Major Assets Quantities
Trickling Filter Pump Station
Building 1
Pumps 6
Trickling Filters A-C
Basins 3
Rotary Distributor 3
Recirculation Fans 6
Major Assets Quantities
Solids Contact & ML Channel
Structures 2
Control gates multiple
Diffusors multiple
Blower/WSS PS Building
Building 1
SR Blowers 3
SC Blowers 3
WSS Pumps 3
Major Assets Quantities
Secondary Clarifiers A-F
SC Basins 6
Sludge Collector 6
Scum pumps 6
RSS PS A
Buildings 1
RSS Pumps 4
RSS PS B
Buildings 1
RSS Pumps 4
Major Assets Quantities
RSS PS C & Electrical Room
Buildings 1
RSS Pumps 4
Distribution Center J
Building 1
Odor Control Facility
Foul Air Fans 3
Chemical scrubbers 3
Carbon Units 3
Major Assets Quantities
Chemical System
Bleach Storage
Tanks 2
Caustic Storage Tank 1
Bleach Pumps 7
Caustic Pumps 6
Acronym Key:
HVAC=Heating, Ventilation,
and Air Conditioning;
DCJ=Distribution Center J;
Elec.=Electrical;
RUL=Remaining Useful Life;
RSS=Return Secondary
Sludge;
MCC=Motor Control Center;
ML=Mixed Liquor;
PLC= Programmable Logic
Controller;
PS= Pump Station;
TF= Trickling Filter;
TFPS= Trickling Filter Pump
Station;
VFD=Variable Frequency
Drive;
WSS=Waste Secondary
Sludge
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
80
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 22 – PLANT NO. 2 SECONDARY TREATMENT – TRICKLING FILTERS
Key Issues
Key Issues Actions and Recommendations
TFPS – Pumps seal water failure due to the seal
tube corrosion
PRN-00493 (MP-551) removed the C2 pump to the manufacture authorized pump shop to do
inspection and evaluation. All six pumps will be repaired with parts replaced with better corrosion
resistant materials. There pumps will be refurbished by the end of 2019.
Snail control – Signs of snail shell
accumulation at process area and excessive
wearing on RSS and WSS pipes.
Changed from 25% percent caustic injection to 50%.
PS18-10 did the evaluation and recommended to change the injection the original design of
flooding. Operation is doing the testing of flooding.
Performed condition assessment of various pipes and replaced the bad pipes.
Clarifiers– Clarifier E out of service since
December 2018 due to the damage of the
moving mechanism.
PRN-00503 (MP-622) performed the condition assessment by the equipment manufacture Ovivo
and will repair the mechanism. Clarifier E will return to service by in December 2019.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
MP-339 Plant No. 2 Trickling Filter Fan Support
Modifications Trickling filter fans Raise the fan motor base, allowing for the use of shorter belts.
PRN-00493
(MP-551)
Plant No. 2 Trickling Filter Seal Tube
Evaluation and Repair TFPS pumps Identify the cause, replace parts and repair all the six pumps.
PRN-00503
(MP-622)
Plant No. 2 TFSC Clarifier E Damage
Evaluation and Repair Clarifier E Identify the cause of the damage, replace the damaged parts,
make modification to bring Clarifier E back to service.
J-117B Outfall Low Flow Pump Station DCJ, TFSC effluent
New PWPS to draw flow from TFSC secondary effluent
Provide 2nd feed to DCJ from Central Generation and load shed
for non-critical loads.
P2-122 Headworks Modifications at Plant No. 2 for
GWRS Final Expansion TFSC influent and effluent TFSC to treat the reclaimable stream.
J-36-2 GWRS Final Expansion Coordination TFSC effluent New diversion structure and weir box to divert the TFSC effluent to
OCWD equalization tanks and pump station at Plant No. 2.
X-031 Plant No. 2 TF/SC Rehabilitation TFSC facility Overall rehab. TF/SC.
Replace the TF media.
Acronym Key:
CIP=Capital Improvement Program; DCJ=Distribution Center J; FY=Fiscal Year;
GWRS =Groundwater Replenishment System; MCC=Motor Control Center; ML=Mixed Liquor;
OCWD= Orange County Water District; PLC= Programmable Logic Controller;
PWPS = Plant Water Pump Station; RSS=Return Secondary Sludge; SC=Secondary Clarifier; TF= Trickling Filter;
TFPS= Trickling Filter Pump Station; TFSC= Trickling Filter Secondary Clarifier; VFD=Variable Frequency Drive;
WSS=Waste Secondary Sludge
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
81
Major Assets
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 24 – PLANT NO. 2 EFFLUENT DISPOSAL
Process Schematic
Major Assets Remaining Useful Life
Asset Type
OO
B
S
Junction Boxes
EP
S
A
Di
s
i
n
f
e
c
t
i
o
n
Sy
s
t
e
m
Land Outfalls
12
0
”
Oc
e
a
n
O
u
t
f
a
l
l
78
”
Oc
e
a
n
O
u
t
f
a
l
l
JB
-1
JB
-C
JB
-A
JB
-8
Su
r
g
e
T
o
w
e
r
#1
Su
r
g
e
T
o
w
e
r
#2
Sa
m
p
l
e
B
u
i
l
d
i
n
g
Be
a
c
h
B
o
x
Civil
Effluent Piping 4 1 2 2 2 4 2 1 2 1 2 - -
Structural
Structures, Buildings 4 1 2 2 2 2 2 1 2 1 2 1 1
Mechanical
Pumps, Fans 3 - - - - 2 2 - - - - - -
Gates 2 1 2 2 2 3 - - - - - - -
Valves 2 - - - - 2 - - 2 - - - -
Pipes 3 1 2 2 2 4 - 1 2 1 1 - -
Manhole Covers - - - - - - - - - - - ? ?
Monel Parts - - - - - - - - - - - ? ?
Ballast - - - - - - - - - - - ? ?
Electrical
Process – Motor, MCC, VFD 5 - - - - 4 2 2 2 2 - - -
Instrumentation
PLC, Flow Meters 5 - - - - 3 2 2 2 2 - - -
Major Assets Quantities
Ocean Outfall Booster Station
Pump 5
Wingwall Structure 1
Gate 3
Junction Boxes
Junction Boxes 4
Wingwall Structure 1
Gate 13
Major Assets Quantities
Effluent Pump Station Annex
Pump 3
Gate 14
Disinfection Facility
Sodium Bisulfite Tank 3
Sodium Bisulfite Feed
Pump 6
Bleach Tank 6
Bleach Feed Pump 8
Major Assets Quantities
Land Outfalls
Surge Tower 2
Sample Building 1
Flowmeters 3
Beach Box 1
120” Ocean Outfall
Port hole 500
Manhole cover 47
Major Assets Quantities
78” Ocean Outfall
Port hole 125
Manhole cover 14
Acronym Key:
EPSA=Effluent Pump
Station Annex;
JB=Junction Box;
MCC=Motor Control
Center;
OOBS=Ocean Outfall
Booster Station;
PLC= Programmable Logic
Controller;
RUL=Remaining Useful
Life;
? = Unknown RUL;
VFD=Variable Frequency
Drive
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
82
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 24 – PLANT NO. 2 EFFLUENT DISPOSAL
Key Issues
Key Issues Actions and Recommendations
Reliability of EPSA Pumps – With J-117B rehabilitating OOBS pumps, up to 2 OOBS pumps
may be down during the construction, which is scheduled to begin in April of 2021. By then,
EPSA system needs to stay reliable to compensate outfall capacity loss from OOBS being
down. There are currently 3 ongoing projects to improve EPSA reliability, which are VFD cells
refurbishment, motor cooling improvement, and EPSA discharge line assessment and repair
EPSA motors cooling issue has been approved by Clearinghouse (PRN-00519) by modifying the motor cooling with
additional internal fans. This effort will be executed by the Small Capital Delivery group.
VFD cells refurbishment and control modernization approved by the Board. Plan is to complete the refurbishment
and perform control upgrades by summer of 2020.
Issued a Purchase Order to perform a confined space entry assessment for EPSA discharge pipelines. Once the
internal condition is known, repair plan will be developed.
OOBS & EPSA Overflow pipe and wing wall assessment – J-117A Interplant Effluent
Pipeline Rehabilitation assessed OOBS overflow structure pipe segments and its concrete wing
wall. The assessment identified separation of the pipe joints and deterioration of the wing wall
PS17-10 Emergency Overflow Weirs, Wing Wall Structural and Geotechnical Investigations is in place to investigate
the root causes of the issues and provide recommendations to protect these structures. This study will feed into a
FE project for execution.
Long Ocean Outfall Assessment – With long outfall pipe approaching 50 years in service,
need an extensive assessment to understand maintenance required to extend the useful life.
The permit with the California State Lands Commission was renewed for 25 years effective
August 28, 2017, and the permit requires to maintain the outfall to use its land.
PS18-09 Ocean Outfall Condition Assessment and Scoping Study is in place to determine the condition of ocean
outfall and provide recommendations to extend its useful life.
X-053 is created to execute rehabilitation efforts per recommendations from PS18-09. May need to assume similar
condition to that of the 78” Outfall to address its condition.
Corrosion issues – Due to its corrosive environment, there are various areas that began to
show signs of coating failure. There are areas, such as EPSA discharge line, that need to be
assessed and Surge Tower welding joint between lower concrete and upper steel shell
Continue to work with coating team to address visible coating failures. PRN-00480 will repair the OOBS pipeline
thermal expansion supports, and PRN-00566 will repair the external coating for OOBS & EPSA pipes
Coordinate with condition assessment team to develop work plans for welding joint and EPSA underground
discharge assessment.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
PS17-10 Emergency Overflow Weirs, Wing Wall
Structural and Geotechnical Investigations OOBS & JB-A Perform a geotechnical and structural assessment of piping and
respective wing wall structures.
PS18-09 Ocean Outfall Condition Assessment 120” Ocean Outfall Determine condition of Ocean Outfall and provide
recommendations.
J-117B Outfall Low Flow Pump Station OOBS & New Low Flow Pump
Station
Rehabilitate the OOBS and construct a new Low Flow Pump
Station.
Replace the Plant Water Pump Station.
X-053 Long Ocean Outfall Rehabilitation 120” Ocean Outfall Rehabilitate long ocean outfall per PS18-09 recommendations.
PRN-00480 OOBS 120-in Pipe Plinths Repair OOBS Conduct repairs on the pipe support by encapsulating with pitch.
PRN-00566 EPSA Pipe Coating EPSA Conduct a repair painting job on areas identified with corrosion to
prevent further deterioration.
PRN-00499 EPSA VFD Modernization EPSA VFD power cell refurbishment and control modernization.
PRN-00519 EPSA Motor Cooling EPSA Modify motor cooling system to provide adequate cooling to the
motor at a lower speed.
N/A Outfall External Inspection 120” Ocean Outfall Ocean outfall external inspection every 2.5 years per lease
agreement with the California State Lands Commission.
N/A Outfall Structural Integrity Report 120” Ocean Outfall Ocean outfall structural integrity report every 5 years per the
NPDES Permit.
Acronym Key:
CIP=Capital Improvement Program; EPSA=Effluent Pump Station Annex; FY=Fiscal Year;
JB=Junction Box; N/A=Not Applicable; NPDES=National Pollutant Discharge Elimination System;
OOBS=Ocean Outfall Booster Station; VFD=Variable Frequency Drive
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
83
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 25 – PLANT NO. 2 SOLIDS HANDLING – DIGESTERS
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Di
g
e
s
t
e
r
C
Di
g
e
s
t
e
r
D
Di
g
e
s
t
e
r
E
Di
g
e
s
t
e
r
F
Di
g
e
s
t
e
r
G
Di
g
e
s
t
e
r
H
Di
g
e
s
t
e
r
I
Di
g
e
s
t
e
r
J
Di
g
e
s
t
e
r
K
Di
g
e
s
t
e
r
L
Di
g
e
s
t
e
r
M
Di
g
e
s
t
e
r
N
Di
g
e
s
t
e
r
O
Di
g
e
s
t
e
r
P
Di
g
e
s
t
e
r
Q
Di
g
e
s
t
e
r
R
Di
g
e
s
t
e
r
S
Di
g
e
s
t
e
r
T
Di
g
e
s
t
e
r
Fe
r
r
i
c
Civil
Effluent Piping 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2
Structural
Structure 3 3 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3 3 2
Digester Dome 3 3 3 3 3 3 2 2 3 3 3 3 3 2 2 2 2 2 -
Mechanical
Sludge Mixing Pumps/Jet
Mixing 4 4 2 4 4 2 2 2 4 4 4 4 4 2 2 2 2 2 -
Sludge Recirculation and
Heating System 3 3 3 3 3 3 2 2 - 3 3 3 3 3 3 3 3 3 -
Hot Water System 4 4 4 4 4 4 2 2 - 4 4 4 4 4 4 4 4 4 -
Sludge Transfer Pump 4 4 2 2 4 4 4 4 4 4 -
Piping & Valve 4 4 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4 4 2
Chemical Pump - - - - - - - - - - - - - - - - - 2
Electrical
MCC & VFD 4 4 4 4 4 4 2 2 4 4 4 4 4 4 4 4 4 4 2
Instrumentation
PLC & Flow Meter 4 4 4 4 4 4 2 2 4 4 4 4 4 4 4 4 4 4 2
Major Assets
Major Assets Quantities
Anaerobic Digesters (C-T)
Active Digesters 15
Active/Holding Digesters
(I&J) 2
Holding Digesters (K) 1
Sludge Mixing Pumps
15+1+4
(1 each Digester + 1 in
Digester K+ 1 backup in each
Digester L, M, N, & O)
Major Assets Quantities
Anaerobic Digesters (C-T) (Continued)
Jet Mixing Pumps 4 (2 each in Digester I&J)
Sludge Recirculation
Pumps 17
Hot Water Circulation
Pumps 17
Heat Exchangers 17
Bottom Sludge Pumps 10
Major Assets Quantities
Digester Ferric Facility
Digester Ferric Storage
Tanks
2
Ferric Feed Pumps 6
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
Acronym Key:
MCC=Motor Control Center;
RUL=Remaining Useful Life;
PLC= Programmable Logic Controller;
VFD=Variable Frequency Drive
84
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 25 – PLANT NO. 2 SOLIDS HANDLING – DIGESTERS
Key Issues
Key Issues Actions and Recommendations
Reliability of Digesters – Keep the existing digesters in operable
condition before the digesters being replaced by new TPAD process
as planned by the Biosolids Master Plan.
Digester replacement food waste related projects.
Digester cleaning and repairs by Maintenance projects that need to be done
while digester out of service after cleaning.
P2-91-1 to rehabilitate existing digesters
Digester Replacement – Building new digester complex as
recommended by Biosolids Master Plan to replace the existing
digesters
Series of projects identified by Biosolids Master Plan and 2017 Facility
Master Plan to replace the digesters with TPAD facility and improve the site.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
20
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
P2-124 Interim Food Waste Receiving Facility Plant No. 2 Digesters, gas treatment
facilities and Central Generation
Receive 150 wet ton per day of source separated and processed
organic food waste to digesters for Co-digestion.
P2-125 Perimeter Screening at Plant No. 2 (on
hold) Plant No. 2 perimeter walls and plants Add additional plants to perimeter wall areas.
P2-126 Plant No. 2 Warehouse Relocation Plant No. 2 Warehouse Relocate existing warehouse.
P2-127 Plant No. 2 Collections Yard Relocation Plant No. 2 Collections Yard Relocate existing Collections Yard.
P2-128 TPAD Digester Facility New TPAD Digester Facility
Build six new thermophilic digesters, batching and cooling facilities
and use the existing digesters as the mesophilic phase to treat the
sludge by TPAD process.
P2-129 Digester P, Q, R, and S Replacement Digester P, Q, R, S Replace digester P, R, R, S as the new mesophilic digesters.
N/A Digester Cleaning Plant No. 2 Digesters Continue the digester cleaning. Digester O and I to be cleaned in
2020.
N/A Digester repairs after cleaning Plant No. 2 digesters Repairs that need to be done while digester out of service.
P2-91-1 Plant No. 2 Digesters Rehabilitations Plant No. 2 Digesters Rehabilitate the digesters to keep them operable until the TPAD
process in operation.
MP-690 Digester G and S Valve replacement Digester G and S Replace penetration valves and other miscellaneous repairs
identified by condition assessment after digester cleaning.
MP-688 Digester F and G Walkway Bridge repair Digester F and G Repair walkway bridge between Digester F and G as
recommended by condition assessment after Digester F cleaning.
PRN-00571 Digester O Repairs Digester O Replace valves and minor repairs from condition assessment after
cleaning
Acronym Key:
CIP=Capital Improvement Program; FY=Fiscal Year; N/A=Not Applicable;
TPAD=Temperature Phased Anaerobic Digestion
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
85
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 25 – PLANT NO. 2 SOLIDS HANDLING – FACILITIES
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Sl
u
d
g
e
Bl
e
n
d
i
n
g
Fa
ci
l
i
t
y
Pl
a
n
t
B
o
i
l
e
r
Ce
n
t
r
i
f
u
g
e
De
w
a
t
e
r
i
n
g
Ce
n
t
r
i
f
u
g
e
Bl
d
g
.
&
S
i
l
o
s
Od
o
r
C
o
n
t
r
o
l
Tr
u
c
k
Lo
a
d
i
n
g
B
a
y
Od
o
r
C
o
n
t
r
o
l
Ga
s
H
a
n
d
l
i
n
g
Ga
s
H
o
l
d
e
r
Tr
u
c
k
Lo
a
d
i
n
g
Civil
Effluent Piping 2 4 1 1 1 - 3 1
Structural
Structure 2 - 1 1 1 - 3 1
Building 1 3 1 - - 4 - -
Mechanical
Pump 2 - 1 1 1 - - -
Fan - - - 1 2 - - -
Boiler & Heat Exchanger - 5 - - - - - -
Centrifuge - - 1 - - - - -
Polymer System - - 1 - - - - -
Biofilter - - - 1 - - - -
Chemical System - - - 1 1 - - -
Gas Compressor - - - - - 4 - -
Gas Dryer - - - - - 2 - -
Gas Flare - - - - - 4 - -
Screw Conveyor - - - - - - - 4
Sliding Frame - - - - - - - 4
Piping & Valve 3 3 1 1 1 3 3 2
Electrical
MCC & VFD 2 2 1 1 1 4 - 3
Instrumentation
PLC & Flow Meter 2 2 1 1 1 4 - 3
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
Acronym Key:
MCC=Motor Control
Center;
PLC= Programmable Logic
Controller;
RUL=Remaining Useful
Life;
VFD=Variable Frequency
Drive
86
Major Assets Quantities
Sludge Blending Facility
Sludge Blending Tanks 2
Digester Feed Pumps 6
Electrical Building 1
Plant Boiler Facility
Building 1
Boilers and heat
exchangers 2
Major Assets Quantities
Dewatering
Centrifuges 5
Sludge Feed Pumps 5
Cake Transfer Pumps 5
Polymer System 1
Major Assets Quantities
Centrifuge Building & Silos Odor
Control
Biofilters 3
Ammonia Scrubber 1
Major Assets Quantities
Truck Loading Bay Odor Control
2-stage Chemical
Scrubbers 2
Gas Handling
Gas Compressors 3
Gas Dryer 1
Gas Flares 3
Major Assets Quantities
Gas Holder
Gas Holder Tank 1
Truck Loading
Cake Storage Silos 2
Sliding Frames 2
Screw Conveyors 12
Key Issues
Key Issues Actions and Recommendations
Boilers and Heat Exchangers – Boiler tube leaking; boiler heat
exchangers wearing out; no steam bypass outlet during boilers PM
and AQMD required testing; boiler corrosion issues
MP-271 – P2 Boiler Heat Exchangers Replacement
PRN-00455 (MP-624) – P2 Boiler Re-tubing
PRN-00456 (MP-547) – P2 Boiler Steam By-pass
Maintenance Activities – Chemical system improvements
Gas Handling System – Gas compressor system lived its life and
need replacement
J-124 – Digester Gas Facilities rehabilitation
Gas compressors repair and overhaul by Maintenance
Truck Loading – Auger No. 6 and No.3 out of service due to age
and wearing from higher solids content from centrifuge dewatered
cake; difficult to lubricate the screw conveyors because of access
issues.
PRN-00513 (MP-585) – P2 Truck Loading Screw Conveyors Replacement
(lubrication extension will be included in the new screw conveyor system)
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
J-124 Digester Gas Facilities Rehabilitation Gas compressors, dryers, flare and
holder system
Replace the entire gas handling system including the gas
compressor building.
MP-271 Plant No. 2 Boiler Heat Exchanger
Replacement Plant No. 2 Boiler system Replace two heat exchangers.
PRN-00456
(MP-547) Plant No. 2 Boiler Steam By-pass Plant No. 2 Boiler system Add steam by-pass to release the steam to the atmosphere at
boiler bldg. room level.
PRN-00455
(MP-624) Plant No. 2 Boiler Re-tubing Plant No. 2 Boiler system Re-tube both boilers.
N/A Plant No. 2 Boiler Chemical system
Improvements Plant No. 2 Boiler system Modifying the existing chemical injection system for better
corrosion control.
PRN-00513
(MP-585)
Plant No. 2 Truck Loading Screw
Conveyor Replacement Plant No. 2 Truck Loading Station Replace all twelve screw conveyors, and lubrication extension will
be included in the new screw conveyor system.
N/A Gas Compressor Overhaul Plant No. 2 Gas compressor facility Overhaul all gas compressors.
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 25 – PLANT NO. 2 SOLIDS HANDLING – SOLIDS HANDLING SYSTEMS
Acronym Key:
AQMD= Air Quality Management District; CIP=Capital Improvement Program; FY=Fiscal Year;
N/A=Not Applicable; PM=Preventative Maintenance
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
87
Major Assets
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 26 – PLANT NO. 2 CENTRAL GENERATION
Process Schematic
Major Assets Remaining Useful Life
Asset Type
En
g
i
n
e
G
e
n
e
r
at
o
r
#
1
En
g
i
n
e
G
e
n
e
r
a
t
o
r
#
2
En
g
i
n
e
G
e
n
e
r
a
t
o
r
#
3
En
g
i
n
e
G
e
n
e
r
a
t
o
r
#
4
En
g
i
n
e
G
e
n
e
r
a
t
o
r
#
5
St
e
a
m
T
u
r
b
i
n
e
G
e
n
e
r
a
t
o
r
St
e
a
m
C
o
n
d
e
n
s
e
r
De
a
e
r
a
t
o
r
V
e
s
s
e
l
He
a
t
R
e
c
o
v
e
r
y
B
o
i
l
e
r
#
1
He
a
t
R
e
c
o
v
e
r
y
B
o
i
l
e
r
#
2
He
a
t
R
e
c
o
v
e
r
y
B
o
i
l
e
r
#
3
He
a
t
R
e
c
o
v
e
r
y
B
o
i
l
e
r
#
4
He
a
t
R
e
c
o
v
e
r
y
B
oi
l
e
r
#
5
OX
I
C
a
t
a
l
y
s
t
SC
R
C
a
t
a
l
y
s
t
Ur
e
a
I
n
j
e
c
t
i
o
n
S
y
s
t
e
m
St
a
r
t
i
n
g
A
i
r
C
o
m
p
r
e
s
s
o
r
#
1
St
a
r
t
i
n
g
A
i
r
C
o
m
p
r
e
s
s
o
r
#
2
St
a
r
t
i
n
g
A
i
r
C
o
m
p
r
e
s
s
o
r
#
3
In
s
t
.
A
i
r
C
o
m
p
r
e
s
s
o
r
#
1
In
s
t
.
A
i
r
C
o
m
p
r
e
s
s
o
r
#
2
Ba
t
t
e
r
y
B
a
c
k
u
p
Pl
a
n
t
W
a
t
e
r
P
i
p
i
n
g
Mi
s
c
e
l
l
a
n
e
o
u
s
Structural
Building - - - - - - - - - - - - - - - - - - - - - - 5 1
Mechanical
General 4 4 4 4 4 5 5 2 3 3 3 3 3 4 4 4 5 5 5 5 5 - - -
HVAC - - - - - - - - - - - - - - - - - - - - - - - 4
Lube Oil System 3 3 3 3 3 5 - - - - - - - - - - - - - - - - - -
Electrical
General 4 4 4 4 4 5 - - - - - - - - - 3 3 3 3 3 5 5 - -
Switchgear 4 4 4 4 4 - - - - - - - - - - - - - - - - - - -
Instrumentation
General 5 5 5 5 5 4 4 3 4 4 4 4 4 3 3 4 4 4 4 5 5 5 - -
Major Assets Quantities
Engine Generator
Gas Engine (16 Cylinder) 5
Electrical Generator 5
Engine Lube Oil System 5
Steam Turbine Generator
Steam Turbine 1
Electrical Generator 1
Steam Condenser 1
Deaerator Vessel 1
Major Assets Quantities
Heat Recovery System
Heat Recovery Boiler 5
Building
Building 1
Piping Various
Engine Emission Control
OXI Catalyst 5
SCR Catalyst 5
UREA Injection System 5
Major Assets Quantities
HVAC
Ventilation Supply Fans 5
Ventilation Exhaust Fans 6
Air Compressors
Engine Starting Air 3
Instrument Air 2
Acronym Key:
HVAC=Heating, Ventilation, and Air Conditioning; Inst.=Instrument; OXI=Oxidizer; RUL=Remaining Useful Life;
SCR= Selective Catalytic Reduction
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
88
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 26 – PLANT NO. 2 CENTRAL GENERATION
Key Issues
Key Issues Actions and Recommendations
Gas Engine Generator Reliability – Monies shall be spent
to address aging components and systems required to
operate the 5 Central Generation Engines.
Overhaul engines (ongoing)
Replace obsolete systems (i.e., Battery Backup, Switch Gear, etc.)
Engine Lube Oil System – The Lube Oil Centrifuges are no
longer operational Install new instrumentation and controls onto the existing 2 units.
Steam Turbine System Rehabilitation – The Steam Turbine
has degraded and is in need of rehabilitation. Overhaul the Steam Turbine and Steam Condenser.
Plant Water Piping – The plant water (i.e., Cooling Water)
piping has degraded and is in need of replacement. Replace all plant water piping in the basement of Central Generation.
Emission Control System – The Housings on the Oxidizer
Catalysts are failing prematurely. Analyze and design new Catalyst Housings.
Instrument Air Compressors – The instrument
air compressors are no longer working.
Replace the entire Instrument Air System, installing new compressors
and appurtenances.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
P2-119 Central Generation Rehabilitation Central Generation Facility Wide Rehabilitation of Gas Engine Support Systems.
FE18-06 Instrument Air Compressor Replacement Instrument Air Compressor
System, Urea Injection System Install 2 new Instrument Air Compressors.
MP-105
PRN-00262 Steam Turbine Rehabilitation Steam Turbine Generator Rehabilitation of the Steam Turbine.
MP-118
PRN-00211 Engine Lube Oil System Controls Upgrade Engine Generator Install new instrumentation and controls onto the existing units.
MP-227 Starting Air Compressor System Rehabilitation Starting Air Compressor System Rehabilitation of the Air Compressors.
MP-231
PRN-00427 Engine Emission Control Redesign OXI/SCR Catalyst Analyze and design new Catalyst Housings.
MP-257
PRN-00394 Steam Condenser Rehabilitation Steam Condenser Replace the Steam Condenser Tube Bundle.
MP-275
PRN-00297 Engine Overhauls Engine Generator Overhaul the engines as needed (ongoing).
MP-305
PRN-00314 Ventilation Supply Fan Rehabilitation HVAC Replace one fan and rehabilitation the fan support structures.
MP-358
PRN-00322 Lube Oil Filter Catwalk Engine Generator Install Lube Oil Filter catwalks for maintenance purposes.
MP-484 Steam Boiler Level Control Upgrade Heat Recovery Boiler Install new technology for improved Boiler level control.
MP-546 Plant Water Pipe Rehabilitation Plant Water Piping Replace existing plant water piping with new.
MP-608 Engine Ignition and Controls Upgrade Engine Generator Replace the existing engine ignition, controls, and fuel system.
Acronym Key:
CIP=Capital Improvement Program; FY=Fiscal Year; HVAC=Heating, Ventilation, and Air Conditioning; OXI=Oxidizer; RUL=Remaining
Useful Life; SCR= Selective Catalytic Reduction
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
89
Major Assets
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 27 – PLANT NO. 2 UTILITIES
Process Schematic
Major Assets Remaining Useful Life
Asset Type
Ci
t
y
W
a
t
e
r
Sy
s
t
e
m
Pl
a
n
t
W
a
t
e
r
Sy
s
t
e
m
Re
c
l
a
i
m
e
d
Wa
t
e
r
P
i
p
i
n
g
Pl
a
n
t
A
i
r
Sy
s
t
e
m
s
Civil
Pipes 2 3 2 -
Structural
Pump Station 3 3 - -
Tanks 3 - - -
Mechanical
Pumps 3 3 - -
Strainers - 3 - -
Compressors - - - 4
Ventilation System 2 2 - -
Electrical
MCC 1 1 - -
VFD 3 3 - -
Instrumentation
PLC, Flowmeter 1 1 - 1
Major Assets Quantities
City Water
Pumps 7
Tanks 4
Piping 8.9 Miles
Major Assets Quantities
Plant Water
Pumps 4
Strainers 4
Piping 10.6 Miles
Major Assets Quantities
Reclaimed Water
Piping 6 Miles
Major Assets Quantities
Plant Air
Compressors 3
Plant Air Piping 6.7 Miles
Instrument Air Piping 1.6 Miles
Acronym Key:
MCC=Motor Control
Center;
RUL=Remaining Useful
Life;
PLC= Programmable Logic
Controller;
VFD=Variable Frequency
Drive
Asset RUL Legend:
RUL <5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL >20 years
90
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 27 – PLANT NO. 2 UTILITIES
Key Issues
Key Issues Actions and Recommendations
Plant/Instrument Air Lines have severe corrosion issues.
Current plan is to run to fail and repair the lines as they fail. In addition, if
opportunity arises through future CIP or FE projects within areas where
known air system deficiencies exist, we will address them at that time.
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
20
FY
20
/21
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FE18-14 Plant Water Pipeline Rehabilitation Piping in tunnels 1600 feet of piping in the tunnels.
FE18-06 Instrument Air Compressors at Central
Generation Central Generation Replace Instrument Air compressors at Central Generation.
J-117B Outfall Low Flow Pump Station Plant Water Pump Station Replace Plant Water Pump Station and plant water piping near
project.
P2-133 B/C Side Primary Clarifiers Rehab Primary Clarifiers Replace City water piping near project.
P2-98A Primary Treatment Rehab City Water Pump Station Refeed City Water Pump Station directly from DC-F 480
switchgear.
X-036 Plant No. 2 City Water Pump Station City Water Pump Station Rehab of City Water Pump Station.
X-037 Plant No. 2 Plant Water Pump Station
Demolition Plant Water Pump Station Demo Plant Water Pump Station.
FE-XX1 Relocation of Air Compressor Central
Generation to Ocean Outfall Booster Station Central Generation and OOBS Relocate existing 100HP Air Compressor.
FE-XX2 Repair Reclaimed Pipe Leaks Piping in tunnels Repair and re-route portions of reclaimed water line near Primary
Clarifiers and Bar Screen.
Acronym Key:
CIP=Capital Improvement Program; FY=Fiscal Year; HP=Horsepower;
OOBS= Ocean Outfall Booster Station
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
91
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 27 – PLANT NO. 2 UTILITIES
Remaining Useful Life of Utility Infrastructure
Acronym Key:
RUL=Remaining Useful Life
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
92
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 27 – PLANT NO. 2 UTILITIES
Remaining Useful Life of Utility Infrastructure
Acronym Key:
RUL=Remaining Useful Life
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
93
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 28 – PLANT NO. 2 ELECTRICAL DISTRIBUTION
Process Schematic
Major Assets
Major Assets Remaining Useful Life
Asset Type
Se
r
v
i
c
e
C
e
n
t
e
r
CE
N
G
E
N
DC
-A
DC
-B
DC
-C
DC
-D
DC
-E
(
E
P
S
A
)
EP
S
A
S
P
F
DC
-H
(
H
e
a
d
w
o
r
k
s
)
He
a
d
w
o
r
k
s
St
a
n
d
b
y
B
u
i
l
d
i
n
g
DC
-J
DC
-K
PB
-A
PB
-B
PB
-C
PB
-D
Tier I – 12.47KV Primary Distribution Level
Transformers: 12.47/2.4kV - - - 4 - - - - - - - - - -
Transformers:
12.47/0.48kV 4 2 3 3 4 4 3 - 2 - 2 1 4 4 4 4
12.47kV Switchgears 3 5 3 3 4 4 4 3 2 2 2 1 - - - -
12.47 kV Level Indicator
Switches - - - - - - - - 2 - 2 1 1 3 3 4
12.47kV Feeders 4 4 1 1 4 4 3 3 2 2 2 1 1 1 1 4
12.47kV Generators - - - - - - - 3 - 3 - - - - - -
Tier II – 4.16kV Distribution Level
4.16kV Feeders - - - - - - - - 2 - - - - - - -
Tier III – 2.4kV Distribution Level
2.4kV Feeders - - - - 4 - - - - - - - - - - -
Tier IV – 480V Distribution Level
480V Switchgears - - 3 - - - - - 2 - 2 1 3 3 3 4
Transfer Switches - - - - - - - - - - - - 4 3 3 4
Generators - - - - - - - - - - - - - - 4 4
Tier V – UPS
UPSs Individual - 5 - 5 5 - 4 - 4 - 4 - - 4 - -
UPSs Regional - - - - - - 4 - - - - - - - - -
Tier VI – 125 VDC and 24 VDC Battery Systems
125VDC Chargers 5 5 5 5 - - - 4 - 4 4 1 4 4 - -
125VDC Batteries 5 5 5 5 - - - 4 - 4 4 1 4 4 - -
24VDC Chargers - 5 - - - - - 4 - 4 - - - - 4 4
24VDC Batteries - 5 - - - - - 4 - 4 - - - - 4 4
Generator Controls
Generator Controls - 5 - - - - - 3 3 - - - - 4 4
Major Assets Quantities
Transformers 58
Standby Generators 9
12kV Switchgears 27
480V Switchgears 32
125VDC and 24VDC Battery Systems 38
Uninterruptible Power Supply (UPS) 27
RUL Legend:
RUL <5 years RUL 5-10 years RUL 11-15 years RUL 16-20 years RUL >20 years
Acronym Key:
CENGEN=Central Generation;
DC=Distribution Center;
kV=Kilovolt;
PB=Power Building;
RUL=Remaining Useful Life;
VDC=Volts of Direct Current;
UPS=Uninterruptible Power Supply
94
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 28 – PLANT NO. 2 ELECTRICAL DISTRIBUTION
Key Issues
Key Issues Actions and Recommendations
Southern California Edison is Currently a single 66kV Feeder Service PS16-02 & Plant No. 2-124 (Plant No. 2-124 will start ~January 2002):
o New 66kV Switchyard; Additional 66kV Line; Additional Transformer with automatic Load tap changes
Aging Battery Chargers and Batteries MP-233: Monitor existing battery life, develop path forward for replacing aged battery and charger systems.
Plant No. 2 Cabling: Aging Medium Voltage Cabling Infrastructure MP-320: Testing aging Medium Voltage Cabling to perform Condition Assessment and develop plan for preventive maintenance.
Plant No. 2 Cabling: 480V (Headworks) failing cables
o Areas where there are no direct Back Up Standby Generation:
o Gas Compressor (4.16kV Motors), PEPs & Trickling Filter Pumps
PRN-00401/MP-509 address repairs.
o J-124 will address Gas Compressors
o Revisit policy to address Back Up Generation for PEPs and Trickling Filter Pumps
Acronym Key:
kV=Kilovolt; PEPS=Primary Effluent Pump Station; V=Volt
95
ASSET MANAGEMENT SYSTEM SUMMARY – AREA 28 – PLANT NO. 2 ELECTRICAL DISTRIBUTION
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
MP-233 Plant No. 2 and P1 Battery
System Upgrade
Plant No. 2 Power
Distribution Replace old batteries and chargers.
MP-320 Plant No. 2 Medium
Voltage Cable PM Services
Plant No. 2 Power
Distribution Medium Voltage Cables Condition Assessment and Testing.
P2-107 SCADA System and
Network Upgraders
Plant No. 2 Power
Distribution
Process Data Network, SCADA System Expansion, Load Management and Load
Shedding.
J-117B Outfall Low Flow Pump
Station
Plant No. 2 Outfall
Booster Station
Rehabilitation of Mechanical, electrical and Civil Systems at the Ocean Outfall Booster
Station at Plant No. 2 that includes 12.47 kV switchgear replacement, VFD motors, and
feeder cable replacement.
P2-98A A-Side Primary Clarifiers
Replacement at Plant No. 2
Plant No. 2 A-Side
Primary Clarifiers
Demolish and replace four (4) existing A-side Primary Clarifiers, Replace Scrubber
Complex, demolish Power Building A and associated electrical equipment, install new
Distribution Center F, including 12.47 kV switchgear, transformers, and 480V
switchgear.
J-124 Digester Gas facilities
Rehabilitation
Plant No. 2 – Gas
compressors and
flares
Project will rehabilitate the low and high pressure gas facilities at Plant No. 1 and Plant
No. 2 to meet current and future OCSD needs such as Air Quality Management District
and NFPA regulations, and future projected gas production.
J-98
Electrical Power
Distribution System
Improvements
Plant No. 2 Power
Distribution System
Provide electrical distribution system improvements at Plant No. 1 and No. 2, as
recommended by the J-25-4 project study, which are needed based on equipment
condition and age, insufficient equipment ratings, grounding safety, non-compliance with
the National Electrical Code requirements, and electrical configuration reliability.
P2-128
Temperature-Phased
Anaerobic Digester at Plant
No. 2
Plant No. 2 – Solids
Handling
Project will replace the mesophilic anaerobic digesters at Plant No. 2 with new digesters
in a TPAD configuration. This project will add new electrical power building with 12 kV
switchgear, 480V switchgears, oil-filled transformers located outside of the building,
VFDs, transfer switches, and cables/conduits.
P2-134 Substation Replacement at
Plant No. 2
Plant No. 2 Power
Distribution
This project will add a second 66-kV incoming distribution line to OCSD Plant No. 2 and
construct a new 66-kV to 12.47-kV substation. The new substation will include two
incoming 66-kV lines and two 66-kV to 12.47-kV transformer.
J-121 UPS System Upgrade Plant No. 2 UPS
System
Provide a regional UPS in the northern portion of Plant No. 2 and provide UPS power
distribution and power distribution units to feed UPS loads from the regional UPSs
installed by this project and existing regional UPSs.
P2-133
Plant No. 2-133 B/C-Side
Clarifiers Rehabilitation at
Plant No. 1
Plant No. 2 Primary
Clarifiers,
Mechanical and
Electrical Systems
Extensively rehabilitate the C-Side primary clarifiers at Plant No. 2. The work is
expected to include demolition of Power Building 80, including backup generator and
installation of new electrical systems.
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
Acronym Key:
CIP=Capital Improvements Program; FY=Fiscal Year; kV=Kilovolt; NFPA= National Fire Protection Association; OCSD=Orange
County Sanitation District; SCADA=Supervisory Control and Data Acquisition;
TPAD=Temperature-Phased Anaerobic Digester; UPS=Uninterruptible Power Supply; V=Volt; VFD=Variable Frequency Drive
96
This page is intentionally left blank.
97
5.2.3 Collection System Pump Station Asset
Management Summaries
98
This page is intentionally left blank.
99
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – PUMP STATIONS
Process Schematic
Major Assets – Quantities
Pump Station Wet Wells Pumps Force
Mains Valves
Emergency
Generators
(Y/N)
15th Street 1 3 2 22 N
A Street 1 3 2 19 N
Bay Bridge 1 5 2 17 Y
Bitter Point 1 5 2 23 Y
College 1 3 2 18 N
Crystal Cove 1 2 2 13 Y
Edinger 1 2 1 8 N
Lido 1 3 2 17 N
MacArthur 1 2 1 8 N
Main Street 2 10 3 38 Y
Rocky Point 1 4 2 18 Y
Slater 1 5 2 17 Y
Seal Beach 2 8 2 24 N
Westside 1 4 1 16 Y
Yorba Linda 1 3 1 11 N
Total 17 62 27 269 --
Major Assets Remaining Useful Life
Asset Type
15
th
St
r
e
e
t
A
S
t
r
e
e
t
Ba
y
B
r
i
d
g
e
Bi
t
t
e
r
P
o
i
n
t
Co
l
l
e
g
e
Cr
y
s
t
a
l
C
o
v
e
Ed
i
n
g
e
r
Li
d
o
Ma
c
A
r
t
h
u
r
Ma
i
n
S
t
r
e
e
t
Ro
c
k
y
P
o
i
n
t
Sl
a
t
e
r
Se
a
l
B
e
a
c
h
We
s
t
s
i
d
e
Yo
r
b
a
L
i
n
d
a
Civil - Piping
Force Mains 3 3 4 2 3 3 4 1 4 4 1 4 3 3 3
Structural
Pump Station 3 4 3 4 1 3 3 3 3 1 2 3 3 2 4
Wet Well 4 4 4 1 2 3 3 4 3 4 4 4 4 3 3
Mechanical
Pumps 3 3 4 1 2 3 3 3 3 4 2 4 5 3 5
Valves 4 3 4 1 3 5 3 4 5 5 5 5 5 3 4
Ventilation System 3 3 4 5 5 4 3 4 3 3 3 3 4 3 2
Emergency Generator -- -- 3 1 -- 3 -- -- -- 2 2 3 -- 2 --
Electrical
Motor Control Center 1 2 4 1 1 3 4 3 4 2 2 2 5 2 3
Variable Frequency Drive 2 3 5 1 3 -- -- 2 3 4 3 4 5 2 --
Motors 3 3 4 1 2 3 2 4 2 2 2 3 4 3 3
Transformer 2 2 4 1 1 3 2 3 4 1 2 2 4 2 3
Instrumentation
Programmable Logic Controller 3 1 4 2 1 1 1 4 1 1 1 1 2 2 1
Flowmeter 3 3 4 2 1 3 4 2 -- 3 2 3 4 3 3
Acronym Key:
RUL=Remaining Useful Life
Asset RUL Legend:
RUL < 5 years
RUL 5-10 years
RUL 11-15 years
RUL 16-20 years
RUL > 20 years
100
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – PUMP STATIONS
Key Issues Actions and Recommendations
Safety – Currently four of OCSD’s older pump stations do not have atmospheric
monitoring (for hydrogen sulfide gases) or standard safety indication lighting.
Also, pump station infrastructure is often located in the public right of way making
safe access to these facilities an on-going issue.
A planning study has been established to review and interpret electrical code and
establish OCSD design standards to address this issue. Practicing on-going safety
measures and traffic control when working in the public right of way will continue to be
of the utmost importance.
Natural Phenomenon – Edinger pump station is located immediately adjacent to
an undersized flood control channel. Crystal Cove pump station is experiencing
gradual site settlement. Both natural hazards present a risk to normal operation
of the pump stations.
Siting analysis has identified an area farther away from the active flood control channel
to which Edinger pump station may be moved. Also, the County of Orange is planning
to increase the capacity of the channel to accommodate future planned flows. A
planning study has been established to determine the necessary mitigation measures
to remediate site settlement at Crystal Cove pump station.
Increased Methane Gas Levels – methane gas accumulation has become a
safety concern at some pump stations. The amount of gas seems to increase
during summer months and presents a unique challenge because of the short
response time necessary to address the safety concerns of increased ignition
risk.
OCSD crews respond to alarms that indicate increased levels of methane gas. An
internal effort has been defined to place flow monitors in the system to collect
necessary data prior to establishing a planning study to determine the cause of the gas
accumulation and possible mitigation measures.
Corrosion – Corrosion is an on-going problem in this very harsh environment. In
places were the system has been kept from venting and mixing of wastewater is
prevalent, such as wet wells, the degree of corrosion has (or will soon) require
the replacement/rehabilitation of the assets.
Visual assessments of known corrosion issues are performed on an on-going basis.
When necessary, cameras are used to evaluate the spreading of corrosion impacts and
confined space entry may be performed to gather additional information to determine
when the facility needs to be rehabilitated.
Groundwater Intrusion – Groundwater has penetrated four of the newly
constructed pump stations in the coastal region of the service area. Groundwater
is notoriously corrosive and may compromise the strength of the rebar within the
concrete structure walls.
Execute a planning study to identify possible mitigation measures.
Maintenance Access – In some cases, such as venting of the Newport Beach
force main system, access to critical facilities is limited by safety and public
impact concerns. In other cases, such as MacArthur Pump Station force main,
access to critical facilities is not possible because redundancy was not
considered when the pump station was designed.
OCSD continues to improve planned maintenance processes and inter-agency
coordination that allow crews to minimize impacts to the community during necessary
maintenance operations. A future capital project has been established to construct a
redundant force main to serve MacArthur pump station.
Rocky Point Pump Station
Main Street Pump Station College Pump Station
Acronym Key:
OCSD=Orange County Sanitation District
101
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – PUMP STATIONS
Current and Future Projects
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
General – Projects that affect more than one pump station
5-68 Newport Beach Pump Station
Odor Control Improvements
Multiple Pump Stations in
Newport Beach Area
Installation of venting
equipment; phased
implementation of chemical
use
FE19-01 Portable Generator Connectors
at Pump Stations Multiple Pump Stations Installation of standard
portable generator connectors
MP-304 Pump Station Deragger Unit
Install Multiple Pump Stations Installation of Deragger units
at multiple pump stations
MP-393 Pump Station On-Call Electrical
PM Services All Pump Stations Various electrical PM services
including testing of equipment
MP-429 Portable Emergency Generator
Set Purchase Multiple Facilities
Purchase of portable
generators and associated
equipment
MP-474
Pacific Coast Highway Force
Main Manual Air Release Valve
PM
Newport Force Main System Venting of force mains on
Pacific Coast Highway
MP-503 Critical Breaker Replacement
Procurement Multiple Pump Stations Procurement of critical
breakers
MP-529 Dry Well Concrete Crack Repair Multiple Pump Stations Groundwater intrusion
remediation
MP-542 Pump Station Bypass Parts
Procurement Multiple Pump Stations Purchase pump station
bypass parts
PS00005 Newport Beach Methane Gas
Reduction Study
Newport Beach Force Main
System
Comprehensive study of
methane gas reduction
alternatives
On Hold - Internal Effort
PS15-08 Collections Capacity Evaluation
Study All Pump Stations Collection system master plan
and model update
PS18-06 Go/No-Go Lights and Signage
Study All Pump Stations Standardize hazardous gas
warning systems
XPS0009 A Street and 15th Street Pump
Station and Force Main Study Entire Pump Station
Comprehensive study of
pump station condition and
capacity
102
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
15th Street Pump Station
MP-658 15th Street Pump Station Force
Main Valve Replacement
Pump Station Force Main
Isolation Valves Replace isolation valves
X-022 15th Street Pump Station and
Force Main Project Entire Pump Station
Comprehensive rehabilitation
of pump station and force
mains
A Street Pump Station
X-041 A Street Pump Station and
Force Main Project Entire Pump Station
Comprehensive rehabilitation
of pump station and force
mains
Bay Bridge Pump Station
5-67A Bay Bridge Pump Station Force
Main Replacement Pump Station Force Main
Comprehensive rehabilitation
of pump station and force
mains
5-67B Bay Bridge Pump Station
Replacement Entire Pump Station
Comprehensive rehabilitation
of pump station and force
mains
MP-681 Bay Bridge Pump Station Valve
Replacement Project Pump Station Isolation Valves Replacement of pump suction
and discharge valves
Bitter Point Pump Station
XPS0004 Bitter Point Pump Station
Rehabilitation Study Entire Pump Station
Comprehensive study of
pump station condition and
capacity
College Pump Station
MP-482 College Pump Station Vapex
Improvements
Pump Station Vapex Unit and
Wet Well Modifications to Vapex Unit
X-026 College Avenue Force Main
Rehabilitation Project Pump Station Force Main Comprehensive rehabilitation
of force mains
103
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
Crystal Cove Pump Station
PS00004 Crystal Cove Pump Station
Settlement Evaluation Crystal Cove Pump Station site Study to determine how to
mitigate site settlement
5-66
Crystal Cove Pump Station
Upgrade and Rehabilitation
Project
Entire Pump Station Comprehensive rehabilitation
of pump station
Edinger Pump Station
11-33 Edinger Pump Station
Rehabilitation Project Entire Pump Station Comprehensive relocation of
pump station
MP-444 Edinger Pump Station UPS
Repairs Pump Station UPS Replacement of pump station
UPS
MP-495 Edinger Pump Station Stair
Repairs Pump Station Stairs Paint metal stairs in the pump
room
PS15-02 Edinger Pump Station
Rehabilitation Study Entire Pump Station
Determine extent of pump
station replacement or
rehabilitation
Lido Pump Station
FE15-10 East Lido Force Main
Rehabilitation Project Pump Station East Force Main Rehabilitation of east force
main
MP-442 Lido Pump Station Bathroom
Drainpipe Replacement
Pump Station Bathroom and
Wet Well
Replacement of drain line
from the bathroom to the wet
well
MP-618 Lido Pump Station Camlock
Receptacle Panel Installation
Pump Station Electrical
Equipment
Installation of standard
portable generator connector
X-023 Lido Pump Station
Rehabilitation Project Entire Pump Station Comprehensive rehabilitation
of pump station
XPS0017 Lido Pump Station
Rehabilitation Study Entire Pump Station
Comprehensive study of
pump station condition and
capacity
104
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
MacArthur Pump Station
7-63 MacArthur Pump Station
Rehabilitation Project Entire Pump Station Comprehensive rehabilitation
of pump station
7-68 MacArthur Force Main
Improvements Pump Station Force Main
Installation of second force
main and rehabilitation of
existing force main
MP-427 MacArthur Pump Station Force
Main Valve Replacement Pump Station Force Main Replacement of force main
isolation valve
Main Street Pump Station
7-64 Main Street Pump Station
Rehabilitation Project Entire Pump Station Comprehensive rehabilitation
of pump station
MP-559 Main Street Pump Station Valve
Replacement Pump Station Isolation Valves Pump And force main
isolation valve replacement
XPS0048 Main Street Pump Station
Rehabilitation Study Entire Pump Station
Comprehensive study of
pump station condition and
capacity
Rocky Point Pump Station
MP-508 Rocky Point Pump Station Wet
Well Liner Repair Pump Station Wet Well Repair wet well liner
XPS0005 Rocky Point Pump Station
Rehabilitation Study Entire Pump Station
Comprehensive study of
pump station condition and
capacity
105
Project No. Project Title Impacted Facilities Description of Work
FY
1
9
/
2
0
FY
20
/2
1
FY
21/
2
2
FY
22/
2
3
FY
23/
2
4
FY
24/
2
5
FY
25/
2
6
FY
26/
2
7
FY
27/
2
8
FY
28/
2
9
FY
29/
3
0
FY
3
0/3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
Slater Pump Station
11-34 Slater Pump Station
Rehabilitation Project Entire Pump Station Comprehensive rehabilitation
of pump station
FE16-14 Slater Pump Station Valve
Replacement
Pump Station Pump Isolation
Valves
Replacement of pump
isolation valves
MP-207 Slater Pump Station Link Seal
Repair Pump Station Dry Well Wall Replace leaking link seal
XPS0044 Slater Pump Station
Rehabilitation Study Entire Pump Station
Comprehensive study of
pump station condition and
capacity
Seal Beach Pump Station
3-67 Seal Beach Pump Station
Replacement Entire Pump Station Reconstruction of pump
station
PRN-00550 Seal Beach Pump Station – Fan
No. 3 Relocation Fan No. 3
Relocate the fan to the
outside of the building for
better maintenance access
N/A Seal Beach Valve Replacement
Project
Pump and force main isolation
valves
Replace 17 gate valves of
various sizes
Westside Pump Station
3-62 Westminster Boulevard Force
Main Replacement Seal Beach PS Force Main Replacement of the force
mains
Yorba Linda Pump Station
2-73 Yorba Linda Pump Station
Abandonment Project
Entire Pump Station and Force
Main
Abandonment of pump station
and force main
Acronym Key:
CIP=Capital Improvement Project; FY=Fiscal Year; N/A=Not Applicable
UPS=Uninterruptible Power Supply
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
106
This page is intentionally left blank
107
5.2.4 Collection System Pipeline Asset
Management Summaries
108
This page is intentionally left blank.
109
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – BAKER-MAIN TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
Ag
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 18.8 339 52 4 3
21” - 27” Ø 9.7 162 33 - -
≥ 30” Ø 6.1 79 44 5 1
Reinforced Concrete
≤ 48” Ø 0.3 4 26 - -
51” - 66” Ø 0.9 12 28 - -
≥ 72” Ø 3.7 35 25 - -
Ductile Iron
42” Ø 0.5 2 28 - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
NASSCO=National Association of Sewer Service Companies
110
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – BAKER-MAIN TRUNK
Key Issues
Key Issues Actions & Recommendations
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
7-65 Gisler-Redhill Interceptor Rehabilitation Project Rehabilitation of sewer facilities in the city of Costa Mesa.
X-082 North Trunk Improvement Project Upsizing of pipe segments to increase capacity in the city of Tustin.
X-075 Fairview Trunk Sewer Rehabilitation Project Rehabilitation of sewer facilities in the city of Costa Mesa.
X-084 Tustin Ave Sewer Relief Project Upsizing of pipe segments to increase capacity in the city of Santa Ana.
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
111
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – BUSHARD TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 0.03 3 54 - -
21” - 27” Ø 5.1 73 54 - 2
≥ 30” Ø 3.6 26 44 - 1
Reinforced Concrete
≤ 48” Ø 2.4 14 55 - -
51” - 66” Ø 0.3 8 55 - -
≥ 72” Ø 4.5 32 19 - -
Fiberglass
36” - 48” Ø 4.7 27 8 - -
Unreinforced Concrete
42” - 48” Ø 1.0 10 22 - -
HDPE
22” Ø 0.06 2 21 - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
HDPE=High-Density Polyethylene Resin;
NASSCO=National Association of Sewer Service Companies
112
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – BUSHARD TRUNK
Key Issues
Key Issues Actions & Recommendations
Bushard Diversion Box - the Bushard Diversion Box is not able to operate as originally intended (flow modulation
between Plant No. 1 and Plant No. 2 based on flows).
A planning study is underway to determine a course of action regarding potential modifications to the Bushard
Diversion Box. This study will also incorporate box rehabilitation beyond the scope of the more immediate repairs
being performed as part of MP-307.
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
25
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
MP-307 Bushard Diversion Box Repairs Repair of structural assets and replacement of electrical and
instrumentation and control components.
PS18-02 Bushard Diversion Structure Rehabilitation Study Study to determine the scope of necessary modifications that will
reinstate and improve operation of the structure.
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Project; FY=Fiscal Year; OCSD=Orange County Sanitation District
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
113
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – COAST TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 2.1 32 60 1 1
21” - 27” Ø 2.6 34 57 - -
≥ 30” Ø 1.8 24 60 - -
Reinforced Concrete
≤ 48” Ø 0.5 5 60 - -
51” - 66” Ø 2.8 38 34 - -
≥ 72” Ø 1.6 11 38 - -
Polyvinyl Chloride
54” Ø 0.05 2 38 - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
NASSCO=National Association of Sewer Service Companies
114
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – COAST TRUNK
Key Issues
Key Issues Actions & Recommendations
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
None - - - - - - - - - - - - - - - - - -
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
115
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – EUCLID TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 4.4 76 56 - 3
21” - 27” Ø 3.9 52 37 - -
≥ 30” Ø 12.1 154 47 - -
Reinforced Concrete
≤ 48” Ø 7.0 69 33 - -
51” - 66” Ø 7.0 75 31 - -
≥ 72” Ø - - - - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
NASSCO=National Association of Sewer Service Companies
116
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – EUCLID TRUNK
Key Issues
Key Issues Actions & Recommendations
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
28
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
None - - - - - - - - - - - - - - - - - -
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
117
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – KNOTT TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 9.0 127 51 21 7
21” - 27” Ø 20.5 299 45 9 4
≥ 30” Ø 17.0 215 38 14 1
Reinforced Concrete
≤ 48” Ø 3.0 37 32 - -
51” - 66” Ø 6.8 57 45 - -
≥ 72” Ø 9.4 66 44 - -
Polyvinyl Chloride
18” Ø 1.2 12 15 - -
Fiberglass
30” Ø 0.04 1 23 - -
Ductile Iron
20” Ø 0.02 1 60 - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
NASSCO=National Association of Sewer Service Companies
118
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – KNOTT TRUNK
Key Issues
Key Issues Actions & Recommendations
Anaheim Coordination – The city of Anaheim owns and operates various small diameter pipelines and diversions
throughout the northern central area of the trunk.
Coordinate with the City of Anaheim pertaining to operation and maintenance of these pipelines and diversions.
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
21
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
3-64A Orange Western Sub-Trunk Rehabilitation Rehabilitate sewer facilities in the cities of Cypress, Anaheim, and
Buena Park.
3-64B Los Alamitos Trunk Sewer Rehabilitation Rehabilitate sewer facilities in the cities of Seal Beach, Los Alamitos,
and the community of Rossmoor.
3-64C Cypress Trunk Sewer Rehabilitation - West Upsize and rehabilitate sewer facilities in the cities of Cypress and La
Palma.
3-64D Cypress Trunk Sewer Rehabilitation - East Rehabilitate sewer facilities in the cities of Cypress and La Palma.
X-071 Bolsa Chica / Edinger / Springdale Rehabilitation Rehabilitation of sewer facilities in the City of Huntington Beach.
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
119
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – MILLER-HOLDER TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 2.9 50 60 - 1
21” - 27” Ø 6.9 87 58 - -
≥ 30” Ø 2.4 5 57 - 2
Reinforced Concrete
≤ 48” Ø 2.9 20 61 - -
51” - 66” Ø 6.6 35 61 - -
≥ 72” Ø 9.8 46 65 - -
Ductile Iron
12” Ø 0.03 2 60 - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
NASSCO=National Association of Sewer Service Companies
120
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – MILLER-HOLDER TRUNK
Key Issues
Key Issues Actions & Recommendations
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
23
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
MP-389 Wintersburg Channel Permit Easement coordination to improve existing manhole access.
3-60 Knott Interceptor Relief Rehabilitation of sewer facilities in the city of Buena Park.
X-062 Caballero Blvd. Trunk Sewer Rehabilitation Rehabilitation of sewer facilities in the city of Buena Park.
X-067 Western Ave. / Hoover St. Trunk Sewer Rehabilitation Rehabilitation of sewer facilities in the city of Westminster.
X-085 Hoover-Western Sub-Trunk Improvement Project Upsizing of sewer segments to increase capacity.
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
121
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – NEWHOPE TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 2.7 57 56 1 1
21” - 27” Ø 2.7 39 59 1 -
≥ 30” Ø 10.5 140 49 - 1
Reinforced Concrete
≤ 48” Ø 4.6 30 61 - -
51” - 66” Ø 3.8 19 57 - -
≥ 72” Ø - - - - -
Polyvinyl Chloride
24” Ø 0.01 1 25 - -
Fiberglass
30” Ø 0.03 1 2 - -
Ductile Iron
20” Ø 1.3 24 30 - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
NASSCO=National Association of Sewer Service Companies
122
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – NEWHOPE TRUNK
Key Issues
Key Issues Actions & Recommendations
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
2-72B &
2-72C Newhope Placentia Trunk Sewer Replacement Upsizing of segments of sewer to increase capacity.
FE10-21 Craig Regional Park Manhole Improvements Manhole access improvements throughout Craig Regional.
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
123
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – NEWPORT TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 6.1 122 44 1 3
21” - 27” Ø 4.5 99 35 - -
≥ 30” Ø 3.8 75 32 - 1
Ductile & Cast Iron
8” - 30” Ø 3.0 44 27 - 1
Polyvinyl Chloride
12” - 36” Ø 2.6 37 19 - -
Cured-in-Place
24” Ø 1.1 13 21 - -
HDPE
20” Ø 0.6 12 27 - 1
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
HDPE=High-Density Polyethylene Resin;
NASSCO=National Association of Sewer Service Companies
124
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – NEWPORT TRUNK
Key Issues
Key Issues Actions & Recommendations
Tuberculation – Some portions of the existing metal pipes have tuberculation which poses a risk. Several of these
segments have been lined; however, some work remains to complete these repairs.
Review condition of unlined metal pipes and rehabilitate pipes subject to tuberculation as needed.
Local Sewers – A portion of gravity collection system that was local service was transferred to Newport Beach. None.
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
None - - - - - - - - - - - - - - - - - -
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
125
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – SARI TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 5.0 114 55 - 2
21” - 27” Ø 11.6 187 44 - 4
≥ 30” Ø 6.0 85 34 - 3
Reinforced Concrete
42” Ø 1.5 19 34 - -
Fiberglass
54” Ø 0.3 2 10 - -
HDPE
12” - 30” Ø 0.7 3 9 - -
Ductile Iron
24” - 48” Ø 0.4 5 27 - -
Steel
24” - 48” Ø 0.03 2 9 - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
HDPE=High-Density Polyethylene Resin; MH=Manhole;
NASSCO=National Association of Sewer Service Companies
126
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – SARI TRUNK
Key Issues
Key Issues Actions & Recommendations
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
31
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
MP-406 SARI Manhole Access Repair Improvements for manholes with limited vehicle access.
MP-435 SAR0060-0000 Access Improvements Coordination with OCFCD to improve vehicle access to manholes.
2-41-8 SARI Rock Stabilizers Removal Removal of rip rap and restoration of access roads.
2-49 Taft Branch Improvements Upsizing of sewer segments to increase capacity.
X-063 Imperial Hwy / 91 Freeway Trunk Sewer Rehabilitation Rehabilitation of sewer facilities in the city of Anaheim.
X-086 Santa Ana River Sewer Relief Project Upsizing of sewer segments to increase capacity.
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; PVC=Polyvinyl chloride;
OCFCD=Orange County Flood Control District; OCSD=Orange County Sanitation District
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
127
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – SUNFLOWER TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 7.06 142 43 1 4
21” - 27” Ø 13.6 207 48 7 4
≥ 30” Ø 4.4 55 44 - 1
Reinforced Concrete
≤ 48” Ø 1.6 15 40 - -
51” - 66” Ø 3.1 32 40 - -
≥ 72” Ø 4.1 27 33 - -
Ductile Iron
20” Ø 0.5 11 20 1 1
Polyvinyl Chloride
30” Ø 0.02 2 13 - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
NASSCO=National Association of Sewer Service Companies
128
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – SUNFLOWER TRUNK
Key Issues
Key Issues Actions & Recommendations
Point Repairs – There are two isolated pipe segments with significant defects. Evaluate the extent of the necessary repairs in these locations.
Sewer Transfer – Approximately 7.8 miles of gravity sewer were transferred to the City of Santa Ana. None.
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
3
3
FY
3
3
/
3
4
FY
3
4
/
3
5
7-66 Sunflower and Red Hill Interceptor Repairs Rehabilitation of sewer facilities in the cities of Santa Ana and Costa
Mesa.
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
129
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – TALBERT TRUNK
System Overview
Major Assets and Condition Information
Asset Type
To
t
a
l
L
e
n
g
t
h
(m
i
l
e
s
)
#
o
f
P
i
p
e
s
Av
e
r
a
g
e
A
g
e
(y
e
a
r
s
)
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
5
#
o
f
N
A
S
S
C
O
St
r
u
c
t
u
r
a
l
4
Vitrified Clay
≤ 18” Ø 0.03 3 62 - -
21” - 27” Ø 3.4 46 66 3 -
≥ 30” Ø 1.7 23 64 - 1
Reinforced Concrete
≤ 48” Ø 3.3 39 49 - -
51” - 66” Ø 0.08 2 55 - -
≥ 72” Ø - - - - -
Structural Grade
Defect Legend:
Grade 5
Grade 4
Acronym Key:
NASSCO=National Association of Sewer Service Companies
Santa Ana Trunk Sewer
130
ASSET MANAGEMENT SYSTEM SUMMARY – COLLECTION SYSTEM – TALBERT TRUNK
Key Issues
Key Issues Actions & Recommendations
Unlined Reinforced Concrete Pipelines – The lower portions of the Santa Ana trunk are unlined reinforced
concrete pipe that has been routinely evaluated and is currently in acceptable condition. These segments are more
prone to corrosion related issues than typical pipe materials utilized within the collection system.
Continue frequent monitoring of the pipeline condition to provide routine updates from which the scheduling of a
future rehabilitation project (X-076) can be determined.
Sewer Transfer – Approximately 7.8 miles of gravity sewer were transferred to the City of Santa Ana. None.
Condition Assessment of Gravity Pipelines - Many factors impact the accuracy of the coding system used to
identify the type and severity of condition issues within the collection system. Video quality, operator experience,
and field conditions often make correct and consistent coding of defects difficult. For this reason, defects that have
been identified may not illicit an immediate response.
OCSD staff reviews condition reports on a regular basis and if necessary, marks the defect for monitoring or repair.
Condition Assessment of Siphons and Large Diameter Pipelines – Siphons are regularly cleaned but are not
inspected because they are inaccessible using CCTV equipment. Large diameter pipe (> 42”) are not cleaned and
CCTV footage does not identify sediment or debris below the waterline.
Develop and execute a Planning Study to identify alternative methods for inspection of siphons and large diameter
pipelines.
Capacity – The Collections Capacity Evaluation Study completed in 2019 conducted a detailed capacity analysis to
identify the location of capacity deficiencies during dry and peak wet weather flows.
Develop and complete CIPs identified by the Collections Capacity Evaluation Study to address capacity issues.
Monitor potential spill locations associated with capacity deficiencies not identified as near-term CIPs.
T-lock – The T-Lock PVC sheet lining system use to line manholes and concrete structures throughout the collection
system will be discontinued.
OCSD staff will investigate alternative liner technologies and methods to repair existing lined structures.
Current and Future Projects
Project No. Project Title Description of Work
FY
1
9
/
2
0
FY
2
0
/
2
1
FY
2
1
/
2
2
FY
2
2
/
2
3
FY
2
3
/
2
4
FY
2
4
/
2
5
FY
2
5
/
2
6
FY
2
6
/
2
7
FY
2
7
/
2
8
FY
2
8
/
2
9
FY
2
9
/
3
0
FY
3
0
/
3
1
FY
3
1
/
3
2
FY
3
2
/
33
FY
3
3
/
3
4
FY
3
4
/
3
5
FEXX-XX
(PRN-00223) Plant No.1 Influent Trunk Sewer Rehabilitation Rehabilitation of influent trunk line.
X-076 Santa Ana Trunk Sewer Rehab Rehabilitation of sewer facilities in the cities of Santa Ana and Costa Mesa.
X-083 Greenville Sullivan Trunk Capacity Upsizing of sewer segments to increase capacity.
Acronym Key:
CCTV=Closed-Circuit Television; CIP=Capital Improvement Program; FY=Fiscal Year; OCSD=Orange County Sanitation District;
PVC=Polyvinyl chloride
Types of Project Legend:
CIP - Planning CIP – Design CIP - Construction Maintenance Project
131
CHAPTER 6 PROGRAM MONITORING AND IMPROVEMENTS
6.1 Program Monitoring
OCSD is continually evaluating AM Program progress and realized benefits. To support the
evaluation, OCSD is in the early stages (first year) of developing metrics for monitoring. The
metrics will be included in subsequent AMP versions.
6.2 AM Program Improvement Opportunities
Several improvement opportunities are defined in Table 6.1 as part of the AM Program
continuous improvement process. Reasonable timeframes are defined for implementing these
improvements. Future AMP updates will summarize the implementation progress.
Table 6.1. AM Program Improvement Opportunities
Improvement
Opportunity Description Timeframe
(Years) Success Measures
Performance
Management
Framework
and Metrics
Establish metrics, processes,
and organizational roles for
tracking and trending the AM
program performance and
progress towards meeting the
GM’s intent.
1-2
Defined metrics
Documented reporting
processes
Remaining
Useful Life
Continue to monitor and update
the condition of assets and
remaining useful life estimates
for major assets.
Ongoing RUL estimate defined for
each major asset
Risk
Assessment
Expand existing risk
assessment process and
update likelihood and
consequence of failure criteria.
Score each major asset using
the criteria.
2-5 Risk score for each major
asset
Integrated
Use of
Maximo
Transition asset hierarchy and
inventory, replacement costs,
risk scores, and RUL estimates
to Maximo to make it the
system of record.
2-5
Maximo used as system of
record
Elimination of Asset
Engineer asset registry
spreadsheets
Life Cycle
Costing
Continue refining processes to
track asset-level life cycle cost
data.
2-5
Documented processes for
conducting life cycle cost
analyses
Formalized templates
Staff trained on processes
and templates
132
This page is intentionally left blank.
133
CHAPTER 7 BUDGETARY CONSIDERATIONS
The AMP focuses on documenting short- to long-term planning of maintenance and capital
improvement projects to support effective budget development and sustainable operations.
OCSD has been striving to more accurately identify medium- to long-term capital cash flow
requirements. Specifically, the Planning Division has been working on developing a 20-year CIP
by creating project plans for forecasted rehabilitation, replacement, improvements and
expansion for the collection system and treatment plants. The CIP budget is being evaluated
and updated on an on-going basis as new information becomes available.
7.1 Capital Improvement Expenditures
Fiscal Year 2019-2020 Budget Update, adopted on June 26, 2019, includes updates to the 20-
year CIP outlay. Figure 7.1 shows the 20-year CIP outlay which includes current and projected
future Capital Improvement Program projects. Fiscal Year 2019-2020 CIP outlay is further
divided into process categories shown in Figure 7.2.
Figure 7.1. 20-Year CIP Outlay
$ mi
l
l
i
o
n
s
20-Year CIP Outlay
134
Figure 7.2 CIP Outlay by Process
Collections
Facilities,
$42.4, 24.1%
Solids Handling
& Digestion,
$17.1, 9.7%
Support
Facilities,
$25.2, 14.3%Utility Systems,
$9.4, 5.3%
Liquid
Treatment,
$54.6, 31.0%
Other, $27.5,
15.6%
FY 19-20 CIP Outlay by Process
(in $millions)
135
7.2 Maintenance Expenditures
7.2.1 Five-Year Historical Maintenance Expenditures
Figure 7.3 and Figure 7.4 show the historical actual spent versus budgeted operational and
maintenance expenditures for the treatment plants and collection system, respectively.
The treatment plant expenditures include maintenance services and materials (budget
objects 54010, 54020).
The collection system expenditures include maintenance services and materials (budget
objects 54010, 54020).
These costs represent the operations and maintenance costs of fixed assets, including
operationally funded repair/replacement projects.
Figure 7.3. Five-Year Historical Maintenance Costs for Treatment Plants
Figure 7.4. Five-Year Historical Maintenance Costs for Collection System
136
7.2.2 Three-Year Look-Ahead Maintenance Expenditures
Table 7.1 shows operational-funded projects identified to-date and includes the projected
annual expenditures. The projects are grouped by location (Plant No. 1, Plant No. 2, and
Collection System), and then sorted by the project start fiscal year and estimated cost (highest
to lowest). The list encompasses projects identified thus far. It is likely FY20-21 and beyond will
fluctuate based on the condition of assets as they age. Additionally, projects in the following list
represent expenditures that are operationally funded and capital in nature.
Table 7.1. Planned Operational-Funded Maintenance Projects in Fiscal Years 2019/20
through 2021/22
# Project Title Location Cost
Type FY19-20 FY20-21 FY21-22 Three-Year
Total Cost
PRN-00159 Bushard Diversion
Structure Repair CS Project $365,000 $365,000 $0 $730,000
PRN-00250
Yorba Linda Pump
Station - Leaking WYE
Needs Replacement
CS Project $60,000 $0 $0 $60,000
PRN-00302
Slater, Lido, And Seal
Beach Pump Station
Deragger Unit Install
CS Project $47,000 $0 $0 $47,000
PRN-00376 Warner Avenue Vault -
Structural Design CS Project $10,000 $0 $0 $10,000
PRN-00377 Warner Avenue Vault -
Structural Repair CS Project $20,000 $0 $0 $20,000
PRN-00393
Pump Station Dry Well
Concrete Crack
Evaluation At A Street,
15th Street, and Bitter
Point Pump Stations
CS Project $0 $0 $0 $0
PRN-00448
Main Street Pump Station
Manual Check Valve And
Plug Valve Replacement-
MP 559
CS Project $80,000 $0 $0 $80,000
PRN-00463 College Pump Station
Vapex Modifications CS Project $30,000 $0 $0 $30,000
PRN-00550 Seal Beach PS - Fan No.
3 Relocation CS Project $30,500 $0 $0 $30,500
Seal Beach Valve
Replacement CS Project $0 $100,000 $0 $100,000
PRN-00435
Pipe Coatings And Sump
Pump In Effluent-
Junction-Box Valve Vault
P1 & P2 Project $0 $0 $0 $0
PRN-00537
P2 And P1 Office Space
For Heavy Mechanics
Group
P1 & P2 Project $0 $0 $0 $0
PRN-00252 Garfield Traffic Spike
Barrier P1 Project $11,000 $0 $0 $11,000
137
# Project Title Location Cost
Type FY19-20 FY20-21 FY21-22 Three-Year
Total Cost
PRN-00263
AS1 Blower Building
Generator Tank Repair
(MP-122) P1 Project $15,000 $0 $0 $15,000
PRN-00332 Lab Second Floor
Repair/Replace Flooring P1 Project $0 $0 $0 $0
PRN-00333 Plant 1 Primary Clarifiers
16-31 Restroom P1 Project $5,000 $0 $0 $5,000
PRN-00375 P1 AS-2 Blower Silencer
Piping Repairs (MP-405) P1 Project $31,798 $0 $0 $31,798
PRN-00385
P1-37 Primary
Rectangular Basin Rehab
(MP-462)
P1 Project $400,000 $400,000 $400,000 $1,200,000
PRN-00398
P1 Power Building 3A
Protective Relay
Replacement
P1 Project $60,000 $0 $0 $60,000
PRN-00402 P1 AS Clarifier Lighting
Replacement P1 Project $71,060 $0 $0 $71,060
PRN-00460 P1 Primary #3 Repairs P1 Project $65,375 $0 $0 $65,375
PRN-00478 P1 AS2 Clarifier #31
Catwalk - Coatings P1 Project $66,570 $0 $0 $66,570
PRN-00489 P1 Barscreen #6
Driveshaft Replacement P1 Project $68,487 $0 $0 $68,487
PRN-00491
Repair Storm Drains
Throughout Plant 1 (MP
584)
P1 Project $0 $0 $40,000 $40,000
PRN-00500
P1 CenGen Elevator
Hydraulic Jack
Replacement
P1 Project $265,230 $0 $0 $265,230
PRN-00507
Work Platforms Over The
Pipes - Plant 1 Truck
Loading Roof P1 Project $6,000 $0 $0 $6,000
PRN-00509 P1 Primary Basin #4
Temp Repairs P1 Project $139,664 $0 $0 $139,664
PRN-00516 PEPS Pump #1
Mechanical Repair P1 Project $80,000 $0 $0 $80,000
PRN-00517 PB-7 Generator Radiator
Repair P1 Project $100,000 $0 $0 $100,000
PRN-00522
Coating - P1 Effluent
Junction Box (EJB) Piping
Coating Repairs (CTO-
0018)
P1 Project $0 $120,000 $0 $120,000
138
# Project Title Location Cost
Type FY19-20 FY20-21 FY21-22 Three-Year
Total Cost
PRN-00526 P1 Emergency Generator
Breaker Spares P1 Project $170,000 $0 $0 $170,000
PRN-00569
Emergency Generator
Protection Relays
Upgrade
P1 Project $150,000 $150,000 $0 $300,000
PRN-00569 P1 Emergency Generator
Relay Upgrade P1 Project $0 $190,000 $0 $190,000
P1 Gas Compressor
Overhaul (1 / Yr) P1 Annual $100,000 $100,000 $100,000 $300,000
P1 Centrifuge Overhaul
(4K Hr) (3/Yr) P1 Annual $1,000,000 $1,000,000 $1,000,000 $3,000,000
P1 CenGen Overhaul (1 /
Yr) P1 Annual $0 $1,800,000 $1,800,000 $3,600,000
P1 Primary Basin Torque
Limiter P1 Annual $0 $500,000 $0 $500,000
P1 Secondary Clarifier
(AS1) Collectors And
Torque Limiters
P1 Annual $0 $2,000,000 $2,000,000 $4,000,000
P1 Holding Digester
Annual Cleaning P1 Annual $0 $300,000 $300,000 $600,000
P1 Digester Cleaning - 5
Year P1 Annual $820,000 $0 $0 $820,000
PRN-00258 Dual Heat Exchanger
Replacement Project $192,815 $0 $0 $192,815
PRN-00207 Plant 2 Clarifier N Steel
Support Cage Repairs P2 Project $8,200 $0 $0 $8,200
PRN-00215
P2 AS2 Secondary
Clarifier Gate
Replacement (MP#252) P2 Project $75,000 $75,000 $0 $150,000
PRN-00241
P2 Cen-Gen Exhaust
Recovery Boiler #2
Repair (MP-266)
P2 Project $200,000 $0 $0 $200,000
PRN-00262 P2 CenGen Steam
Turbine Rehabilitation P2 Project $189,528 $0 $0 $189,528
PRN-00306 P2 Primary Clarifier E & D
Repairs P2 Project $275,000 $0 $0 $275,000
PRN-00331
P2 Dewatering Building
Plant Water Pipe Repair
(MP-385)
P2 Project $54,000 $0 $0 $54,000
139
# Project Title Location Cost
Type FY19-20 FY20-21 FY21-22 Three-Year
Total Cost
PRN-00340 P2 TF 'A' Refurbishment P2 Project $98,478 $0 $0 $98,478
PRN-00374
Plant 2 South Scrubber
Complex Bleach Pump
Turndown
P2 Project $86,000 $0 $0 $86,000
PRN-00394
P2 CenGen Steam
Turbine Condenser
Repair
P2 Project $232,100 $0 $0 $232,100
PRN-00398
P2 Power Building 'C'
Protective Relay
Replacement
P2 Project $60,000 $0 $0 $60,000
PRN-00409
P2 Headworks Low
Voltage Cable
Assessment
P2 Project $397,500 $397,500 $0 $795,000
PRN-00428
P2 Trickling Filter Fan
Support Fan
Modifications Pilot
P2 Project $10,000 $0 $0 $10,000
PRN-00441
MP-592 P2 CenGen
Engine #3 Exhaust
System Repair P2 Project $50,000 $0 $0 $50,000
PRN-00451 P2 Secondary Clarifier
Repairs (MP-248) P2 Project $1,524,000 $1,524,000 $0 $3,048,000
PRN-00457 P2 AS Plant Inlet Gate
Replacement P2 Project $662,000 $0 $0 $662,000
PRN-00493 P2 TF Pump Overhaul /
Seal Tube Evaluation P2 Project $631,000 $0 $0 $631,000
PRN-00499 P2 EPSA VFD Upgrades P2 Project $218,842 $218,842 $0 $437,684
PRN-00503
P2 TF Clarifier 'E'
Damage Evaluation &
Repair
P2 Project $190,280 $0 $0 $190,280
PRN-00512 Plant No. 2 Steam Pipe
Repairs P2 Project $0 $25,000 $0 $25,000
PRN-00513 P2 Truck Loading Auger
Replacement P2 Project $913,400 $0 $0 $913,400
PRN-00521
P2 Aeration Basins
Mixers Coating Repairs
(CTO-0028)
P2 Project $0 $0 $0 $0
PRN-00529 P2 MSP Motor Overhaul P2 Project $0 $462,000 $0 $462,000
PRN-00530 Plant No. 2 Digester
Facilities Rehabilitation P2 Project $50,000 $0 $0 $50,000
140
# Project Title Location Cost
Type FY19-20 FY20-21 FY21-22 Three-Year
Total Cost
PRN-00530 P2 Digester F Repair P2 Project $150,000 $0 $0 $150,000
PRN-00557 P2 Digester S Concrete
Crack Repair P2 Project $10,000 $0 $0 $10,000
PRN-00561
AI-041 P2 MSP Vibration
Monitoring System
Modernization
P2 Project $0 $277,000 $0 $277,000
PRN-00565 Plant 2 EPSA Building
City Water Line Repair P2 Project $15,000 $0 $0 $15,000
PRN-00566 EPSA Piping Coating P2 Project $50,000 $0 $0 $50,000
PRN-00570
Primary Treatment
Rehabilitation at P2 B/C
Side Primary Clarifiers
P2 Project $462,000 $0 $0 $462,000
P2 Cake Transfer Pumps
Overhaul P2 Project $0 $275,000 $0 $275,000
P2 Secondary Clarifier
Repairs (Phase II) P2 Project $50,000 $50,000 $0 $100,000
P2 Centrifuge Damage
Repair And Spare Part
Purchase
P2 Project $0 $0 $3,000,000 $3,000,000
P2 Gas Compressor
Overhaul (1 / Yr) P2 Annual $100,000 $100,000 $100,000 $300,000
P2 Centrifuge Overhaul
(4K Hr) (3/Yr) P2 Annual $1,000,000 $1,000,000 $1,000,000 $3,000,000
P2 CenGen Overhaul (1 /
Yr) P2 Annual $0 $2,200,000 $2,200,000 $4,400,000
P2 AS Plant High Rate
Mix Pumps Corrosion
Repairs P2 Annual $0 $500,000 $0 $500,000
P2 Cathodic
Protection/Ground Rod
Replacement
P2 Annual $0 $0 $0 $0
P2 Holding Digester
Annual Cleaning P2 Annual $0 $500,000 $500,000 $1,000,000
P2 Digester Cleaning - 5
Year P2 Annual $1,664,640 $0 $0 $1,664,640
Acronym Key:
AS=Activated Sludge, AS1=Activated Sludge Plant No. 1; AS2=Activated Sludge Plant No. 2; CenGen=Central Generation;
CS = Collection System; EPSA=Effluent Pump Station Annex; MP=Maintenance Project; MSP=Main Sewage Pump;
P1=Plant No. 1, P2=Plant No. 2; PEPS=Primary Effluent Pump Station; PS=Pump Station; TF=Trickling Filter;
VFD=Variable Frequency Drive; Yr=Year
10844 Ellis Avenue, Fountain Valley, California 92708
Reclamation Plant No.1 (Administration Offices)
Treatment Plant No. 2
22212 Brookhurst Street, Huntington Beach, California 92646
Phone: 714.962.2411www.ocsd.com
Follow us on:
Orange County Sanitation District
ADMINISTRATION COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2020-952 Agenda Date:3/11/2020 Agenda Item No:3.
FROM:James D. Herberg, General Manager
Originator: Lan C. Wiborg, Director of Environmental Services
SUBJECT:
ORANGE COUNTY SANITATION DISTRICT - ENVIRONMENTAL SERVICES
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Information Item.
BACKGROUND
Each month,staff provides an informational presentation on topics of interest to the Board of
Directors.This month’s topic:Orange County Sanitation District’s Environmental Services
Department - Constituents of Emerging Concern: PFAS.
RELEVANT STANDARDS
·Comply with environmental permit requirements
·Use all practical and effective means for resource recovery
·Listen to and seriously consider community input on environmental concerns
·Build brand, trust, and support with policy makers and community leaders
ATTACHMENT
The following attachment(s)may be viewed on-line at the OCSD website (www.ocsd.com)with the complete agenda
package:
N/A
Orange County Sanitation District Printed on 3/4/2020Page 1 of 1
powered by Legistar™
Orange County Sanitation District
ADMINISTRATION COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2020-951 Agenda Date:3/11/2020 Agenda Item No:4.
FROM:James D. Herberg, General Manager
Originator: Lorenzo Tyner, Assistant General Manager
SUBJECT:
FY 2020-21 AND FY 2021-22 ORANGE COUNTY SANITATION DISTRICT BUDGET REVENUE
OVERVIEW
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Information Item.
BACKGROUND
Staff will provide an informational presentation on the revenues and reserves of the Orange County
Sanitation District’s Proposed Fiscal Year 2020-21 and 2021-22 Budget.
The Proposed Budget will be presented for adoption at the June 24,2020 Board of Directors
meeting.
ATTACHMENT
The following attachment(s)are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
·FY 2020-21 and 2021-22 Budget Revenue Detail
·Reserve Summary - FY 2019-20
Orange County Sanitation District Printed on 3/4/2020Page 1 of 1
powered by Legistar™
1
FY 2020-22 Budget Development Revenue Detail
Revenue Summary (in millions)
Category 2019-20
Adopted
2020-21
Proposed
2021-22
Proposed
Revenues:
Service Fees 298.1 302.8 307.5
Permit User Fees 9.9 10.0 10.2
Capital Facility Capacity Charge 18.0 18.6 18.7
Property Taxes 96.4 99.0 101.7
Interest 6.5 6.4 6.5
Other Revenue 39.2 48.0 50.2
Debt Proceeds 0.0 0.0 0.0
Total Revenue $468.1 $484.8 $494.8
The District has a variety of revenue sources available for operating and capital expenses.
The major revenue sources are as follows:
• General Sewer Service Fees
• Industrial Waste Permit User Fees
• Capital Facilities Capacity Charges (CFCC)
• Property Taxes
• Interest Earnings
• Other Miscellaneous Revenue
• Debt Proceeds
2020-21 2021-22
General Service Fees –
User fees are ongoing fees for service paid by customers
connected to the sewer system. A property owner, or user, does
not pay user fees until connected to the sewer system and
receiving services. Once connected, a user is responsible for his
share of the system’s costs, both fixed and variable, in proportion
to his demand on the system. These fees are for both Single
Family Residences (SFR) and Multiple Family Residences
(MFR).
FY 2020-21 is the third year of the most recent five-year sewer
service fee rate schedule approved by the Board. The SFR rate
(the underlying basis for all sewer rates) will increase by 1.2
percent ($4) in each year of the two-year budget to $343 in FY
2020-21 and to $347 in FY 2021-22. These rates are still well
below the average annual sewer rate currently being charged
throughout the state.
$302.8M $307.5M
2
2020-21 2021-22
Industrial Waste Permit User Fees –
Fees paid by large industrial and commercial properties owners
connected to the sewer system. These fees are for the owner’s
share of the system’s costs, both fixed and variable, in proportion
to his demand on the system.
Since the inception of the Permit User Fee program in 1970,
users of the District’s system that discharge high volumes or high
strength wastewater are required to obtain a discharge permit
and pay for the full cost of service.
$10.0M $10.2M
Capital Facilities Capacity Charges (CFCC) –
Capital Facilities Capacity Charge is a one-time, non-
discriminatory charge imposed at the time a building or structure
is newly connected to the District’s system, directly or indirectly,
or an existing structure or category of use is expanded or
increased. This charge pays for District facilities in existence at
the time the charge is imposed, or to pay for new facilities to be
constructed in the future, that are of benefit to the property being
charged.
$18.6M $18.7M
Property Taxes –
The County is permitted by State law (Proposition 13) to levy
taxes at 1% of full market value (at time of purchase) and can
increase the assessed value no more than 2% per year. The
District receives a share of the basic levy proportionate to what
was received in the 1976 to 1978 period less $3.5 million, the
amount that represents the State’s permanent annual diversion
from special districts to school districts that began in 1992-93.
The District’s share of this revenue is dedicated for the payment
of debt service.
$99.0M $101.7M
Interest Earnings –
Interest earnings are generated from the investment of
accumulated reserves consisting of a cash flow/contingency, a
capital improvement, a renewal/replacement, and a self-
insurance reserve.
$6.4M $6.5M
Other Revenue –
Other revenue includes solids handling and capital assessments
from the Irvine Ranch Water District (IRWD); and O&M sewer
services provided to IRWD, the Santa Ana Watershed Protection
Authority (SAWPA), and the Sunset Beach Sanitary District.
$48.0M $50.2M
3
2020-21 2021-22
Debt Proceeds –
Certificates of Participation (COPs) are the District’s primary
mechanism for financing capital projects. COPs are repayment
obligations based on a lease or installment sale agreement.
COPs are viewed by the State of California as a share in an
installment arrangement where the District serves as the
purchaser. No new debt issuances are projected in the near-
term.
$0.0M $0.0M
Financing
If is necessary that the District utilize debt financing to meet its total obligations and to meet
projected construction schedules, the District uses long-term borrowing (Certificates of
Participation (COP)) for capital improvements that cannot be financed from current revenue.
Before any new debt is issued, the impact of debt service payments on total annual fixed costs is
analyzed. No new debt issuance is currently being planned.
The District Maintains its AAA Rating
The District maintains ratings of “AAA” from Standards and Poor and “AA” from Fitch. A triple A
rating is the highest obtainable for any governmental agency. In order to maintain this rating, the
District adheres to its 2001 Debt Policy and coverage ratios requirements. This Board-adopted
policy serves as the agency’s guide in the management of existing debt and in the issuance of
future debt.
OCSD Has Contractual Covenants
The District has contractual covenants within the existing COP agreements which require
minimum coverage ratios of 1.25. The minimum coverage ratio is the ratio of net annual revenues
available for debt service requirements to total annual debt service requirements for all senior lien
COP debt. The coverage ratio for senior lien COP debt was approved at 3.67 for FY 2019-20.
Orange County Sanitation District
Reserve Summary - FY 2019-20
Orange County Sanitation District (OCSD) has a Board of Directors Reserve Policy that sets forth seven criteria to
be used to determine its reserve level. As part of the OCSD financial and operating process, we have developed a
Reserve Policy which governs the establishment of our reserve level and the use of those funds. To ensure an
adequate and diverse reserve policy, we have established seven different criteria. These are not seven different
reserves, but seven criteria used to set the total reserve level. Reserves can only be used with the approval of
the Board of Directors. Below is a brief summary of the OCSD Reserve Criteria.
Reserve Policy Summary
Non-Discretionary
1) Debt Covenants and Other Requirements – Required by OCSD bondholders – $94 million – RESTRICTED
This level is set by various bond covenants. As OCSD issues debt, it is required to maintain certain levels
of reserves held specifically for repayment of that debt and cannot be reduced or used prior to repayment
of all outstanding debt issuances.
2) “Dry Period” – Property Tax Payments – 50% of Operating Costs – $84 million
The largest portion of OCSD revenues are user fees, approximately $300 million. These fees are listed on
and collected through the County property tax bill. Since we receive payments twice each year, we hold
funds in reserve specifically to pay operating expenses pending receipt of those payments.
3) “Dry Period” – Property Tax Payments – 100% of August Debt Service Costs – $77 million
The largest portion of OCSD revenues are user fees, approximately $300 million. These fees are listed on
and collected through the County property tax bill. Since we receive payments twice each year, we hold
funds in reserve specifically to pay debt service pending the receipt of those payments.
Discretionary
4) Operating Budget – 10% of the total Operating Budget as a Contingency – $17 million
We hold ten percent of our operating budget as an operating contingency for non-recurring and
unanticipated expenditures.
5) Capital Improvement Budget – 50% of the average 10-year CIP Program – $137 million
OCSD currently has a ten-year, $2 billion Capital Improvement effort. We hold the equivalent of 5% of
that total as a contingency specifically related to these Capital Improvement Program efforts.
6) Rehabilitation and Refurbishment – $64 million
In 2002, OCSD established a reserve level related to rehabilitation efforts at $50 million based on the
rehabilitation or replacement costs at that time. Although the total costs for rehabilitation or replacement
has increased substantially since 2002 as a result of the move to Full Secondary Treatment and the
Construction of GWRS, this reserve guideline has only been increases 2% annually, making it potentially
under-funded.
7) Catastrophic loss / Self-insurance – $57 million
OCSD is Self-Insured for Catastrophic Loss. $57 million of the District’s total reserves are related to holding
funds for this category. Although OCSD now has more than $10 billion in asset replacement value, this
level has not been increased since its establishment more than 10 years ago, making it potentially under-
funded.
Current 2019-20 Reserve Policy Requirement $530 million
Orange County Sanitation District
ADMINISTRATION COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2020-953 Agenda Date:3/11/2020 Agenda Item No:5.
FROM:James D. Herberg, General Manager
Originator: Lorenzo Tyner, Assistant General Manager
SUBJECT:
OVERVIEW OF PROPERTY - LIABILITY INSURANCE
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Information Item.
BACKGROUND
Staff will provide an informational presentation on the Orange County Sanitation District’s (Sanitation
District)major insurance policies.The process of renewal begins each January,and final quotes are
typically received in June, shortly before the beginning of the new fiscal year.
The Sanitation District’s budget provides funds for the renewal of the following four (4)major
insurances for Sanitation District operations:
1)Excess General Liability Insurance
The Sanitation District’s Excess General Liability Insurance Program is currently provided
through the California Municipal Excess Liability Program (CAMEL)and its sister program,the
Alliant National Municipal Liability Program (ANML).The Sanitation District has participated in
the CAMEL program since FY 1996-97.
This program currently provides the Sanitation District with a $40 million dollar policy of
comprehensive coverage for municipal liability,bodily injury and property damage,and
personal injury.The program was structured to also include Employment Practices and Public
Officials Errors &Omissions coverage.The $40 million dollar coverage has a self-insured
deductible of $500,000.Since 1997,the Employment Practices portion of coverage has been
enhanced from a $2 million dollar sub-limit to the full policy limit of $40 million dollars.
2)Excess Workers’ Compensation
The Excess Workers’Compensation insurance coverage is with the California State
Association of Counties Excess Insurance Authority (CSAC EIA).The Sanitation District has
participated in this program or its predecessor since 2003.The Excess Workers’
Compensation program currently provides “Statutory”(unlimited)coverage with a self-insured
retention (SIR),or deductible,of $1 million dollars.The use of Excess Workers’
Orange County Sanitation District Printed on 3/4/2020Page 1 of 2
powered by Legistar™
File #:2020-953 Agenda Date:3/11/2020 Agenda Item No:5.
retention (SIR),or deductible,of $1 million dollars.The use of Excess Workers’
Compensation Insurance dates back to the late 1980’s.
3)All-Risk Property and Flood Insurance (Includes Boiler & Machinery Insurance)
The All-Risk Property and Flood Insurance Program (Property Insurance)provides
comprehensive coverage for much of the Sanitation District’s real and personal property
regarding virtually all perils including fire, flood, and business interruption.
Current Property Insurance limits are $1 billion dollars for most perils other than flood and
earthquakes,and $300 million dollars for flood,with many sub-limits for various situations.In
order to reach $1 billion dollars in limits,the broker had to arrange for more than a dozen
different insurers. The SIR is $250,000 per occurrence for most types of losses.
Since the late 1990’s,the Property Insurance has been with a nationwide joint purchase
property insurance program called Public Entity Property Insurance Program (PEPIP),one of
the world’s largest property programs.It is important to note that this joint purchase property
insurance program offers the purchasing power of numerous large public entities without the
pooling or sharing of coverage or losses.
The Boiler &Machinery Insurance Program,part of the property insurance,provides
comprehensive coverage for loss caused by machinery breakdown and explosion of steam
boilers or other covered process equipment,including damage to the equipment itself and
damage to other property caused by covered accidents.The current Boiler &Machinery
Insurance Program provides coverage of $100 million dollars per occurrence with deductibles
ranging from $25,000 to $350,000 for losses caused by covered machinery breakdown (e.g.,
motors,steam turbines,digesters,co-gen engines).Damages to the equipment,as well as
damages to other property and improvements caused by the machinery breakdown,are
covered by the Boiler &Machinery Insurance.This program augments the Sanitation District’s
All-Risk Property Insurance that covers perils such as fire and flood.
4)Earthquake Insurance
The Sanitation District previously carried earthquake insurance as part of its Property
Insurance,but in the last 15 years earthquake insurance proved difficult to obtain or not cost-
effective.The Sanitation District asked its insurance broker each year to survey the market to
see if rates have changed.Finally,in 2015 a plan was created to insure several key Sanitation
District structures identified by Engineering,thus keeping the cost in line.The insurance is a
high deductible plan with a limit of $25 million dollars in total.
RELEVANT STANDARDS
·Protect Orange County Sanitation District assets
ATTACHMENT
The following attachment(s)may be viewed on-line at the OCSD website (www.ocsd.com)with the complete agenda
package:
N/A
Orange County Sanitation District Printed on 3/4/2020Page 2 of 2
powered by Legistar™
ORANGE COUNTY SANITATION DISTRICT
COMMON ACRONYMS
ACWA Association of California
Water Agencies LAFCO Local Agency Formation
Commission RWQCB Regional Water Quality
Control Board
APWA American Public Works
Association LOS Level Of Service SARFPA Santa Ana River Flood
Protection Agency
AQMD Air Quality Management
District MGD Million Gallons Per Day SARI Santa Ana River
Interceptor
ASCE American Society of Civil
Engineers MOU Memorandum of
Understanding SARWQCB Santa Ana Regional Water
Quality Control Board
BOD Biochemical Oxygen Demand NACWA National Association of Clean
Water Agencies SAWPA Santa Ana Watershed
Project Authority
CARB California Air Resources
Board NEPA National Environmental
Policy Act SCADA Supervisory Control And
Data Acquisition
CASA California Association of
Sanitation Agencies NGOs Non-Governmental
Organizations SCAP
Southern California
Alliance of Publicly Owned
Treatment Works
CCTV Closed Circuit Television NPDES National Pollutant Discharge
Elimination System SCAQMD South Coast Air Quality
Management District
CEQA California Environmental
Quality Act NWRI National Water Research
Institute SOCWA South Orange County
Wastewater Authority
CIP Capital Improvement
Program O & M Operations & Maintenance SRF Clean Water State
Revolving Fund
CRWQCB California Regional Water
Quality Control Board OCCOG Orange County Council of
Governments SSMP Sewer System
Management Plan
CWA Clean Water Act OCHCA Orange County Health Care
Agency SSO Sanitary Sewer Overflow
CWEA California Water Environment
Association OCSD Orange County Sanitation
District SWRCB State Water Resources
Control Board
EIR Environmental Impact Report OCWD Orange County Water District TDS Total Dissolved Solids
EMT Executive Management Team OOBS Ocean Outfall Booster Station TMDL Total Maximum Daily Load
EPA US Environmental Protection
Agency OSHA Occupational Safety and
Health Administration TSS Total Suspended Solids
FOG Fats, Oils, and Grease PCSA
Professional
Consultant/Construction
Services Agreement
WDR Waste Discharge
Requirements
gpd gallons per day PDSA Professional Design Services
Agreement WEF Water Environment
Federation
GWRS Groundwater Replenishment
System POTW Publicly Owned Treatment
Works WERF Water Environment &
Reuse Foundation
ICS Incident Command System ppm parts per million WIFIA Water Infrastructure
Finance and Innovation Act
IERP Integrated Emergency
Response Plan PSA Professional Services
Agreement WIIN
Water Infrastructure
Improvements for the
Nation Act
JPA Joint Powers Authority RFP Request For Proposal WRDA Water Resources
Development Act
ORANGE COUNTY SANITATION DISTRICT
GLOSSARY OF TERMS
ACTIVATED SLUDGE PROCESS – A secondary biological wastewater treatment process where bacteria reproduce at a high
rate with the introduction of excess air or oxygen and consume dissolved nutrients in the wastewater.
BENTHOS – The community of organisms, such as sea stars, worms, and shrimp, which live on, in, or near the seabed, also
known as the benthic zone.
BIOCHEMICAL OXYGEN DEMAND (BOD) – The amount of oxygen used when organic matter undergoes decomposition by
microorganisms. Testing for BOD is done to assess the amount of organic matter in water.
BIOGAS – A gas that is produced by the action of anaerobic bacteria on organic waste matter in a digester tank that can be used
as a fuel.
BIOSOLIDS – Biosolids are nutrient rich organic and highly treated solid materials produced by the wastewater treatment process.
This high-quality product can be recycled as a soil amendment on farmland or further processed as an earth-like product for
commercial and home gardens to improve and maintain fertile soil and stimulate plant growth.
CAPITAL IMPROVEMENT PROGRAM (CIP) – Projects for repair, rehabilitation, and replacement of assets. Also includes
treatment improvements, additional capacity, and projects for the support facilities.
COLIFORM BACTERIA – A group of bacteria found in the intestines of humans and other animals, but also occasionally found
elsewhere, used as indicators of sewage pollution. E. coli are the most common bacteria in wastewater.
COLLECTIONS SYSTEM – In wastewater, it is the system of typically underground pipes that receive and convey sanitary
wastewater or storm water.
CERTIFICATE OF PARTICIPATION (COP) – A type of financing where an investor purchases a share of the lease revenues of
a program rather than the bond being secured by those revenues.
CONTAMINANTS OF POTENTIAL CONCERN (CPC) – Pharmaceuticals, hormones, and other organic wastewater
contaminants.
DILUTION TO THRESHOLD (D/T) – The dilution at which the majority of people detect the odor becomes the D/T for that air
sample.
GREENHOUSE GASES (GHG) – In the order of relative abundance water vapor, carbon dioxide, methane, nitrous oxide, and
ozone gases that are considered the cause of global warming (“greenhouse effect”).
GROUNDWATER REPLENISHMENT SYSTEM (GWRS) – A joint water reclamation project that proactively responds to Southern
California’s current and future water needs. This joint project between the Orange County Water District and the Orange County
Sanitation District provides 70 million gallons per day of drinking quality water to replenish the local groundwater supply.
LEVEL OF SERVICE (LOS) – Goals to support environmental and public expectations for performance.
N-NITROSODIMETHYLAMINE (NDMA) – A N-nitrosamine suspected cancer-causing agent. It has been found in the
Groundwater Replenishment System process and is eliminated using hydrogen peroxide with extra ultra-violet treatment.
NATIONAL BIOSOLIDS PARTNERSHIP (NBP) – An alliance of the National Association of Clean Water Agencies and Water
Environment Federation, with advisory support from the US Environmental Protection Agency. NBP is committed to developing
and advancing environmentally sound and sustainable biosolids management practices that go beyond regulatory compliance
and promote public participation to enhance the credibility of local agency biosolids programs and improved communications that
lead to public acceptance.
PLUME – A visible or measurable concentration of discharge from a stationary source or fixed facility.
PUBLICLY OWNED TREATMENT WORKS (POTW) – A municipal wastewater treatment plant.
SANTA ANA RIVER INTERCEPTOR (SARI) LINE – A regional brine line designed to convey 30 million gallons per day of non-
reclaimable wastewater from the upper Santa Ana River basin to the ocean for disposal, after treatment.
SANITARY SEWER – Separate sewer systems specifically for the carrying of domestic and industrial wastewater. Combined
sewers carry both wastewater and urban runoff.
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) – Regional regulatory agency that develops plans and
regulations designed to achieve public health standards by reducing emissions from business and industry.
SECONDARY TREATMENT – Biological wastewater treatment, particularly the activated sludge process, where bacteria and
other microorganisms consume dissolved nutrients in wastewater.
SLUDGE – Untreated solid material created by the treatment of wastewater.
TOTAL SUSPENDED SOLIDS (TSS) – The amount of solids floating and in suspension in wastewater.
TRICKLING FILTER – A biological secondary treatment process in which bacteria and other microorganisms, growing as slime
on the surface of rocks or plastic media, consume nutrients in wastewater as it trickles over them.
URBAN RUNOFF – Water from city streets and domestic properties that carry pollutants into the storm drains, rivers, lakes, and
oceans.
WASTEWATER – Any water that enters the sanitary sewer.
WATERSHED – A land area from which water drains to a particular water body. The Orange County Sanitation District’s service
area is in the Santa Ana River Watershed.