Ocean Outfall Condition
Assessment and Scoping Study
Presented by:
Valerie Ratto
Senior Engineer
Operations
Committee
December 1, 2021
2
Overview of Outfall
Offshore Pipeline
5 Miles Long
120‐Inch Diameter
Emergency Outfall
1.5 Miles Long
78‐Inch Diameter
OC SAN
1
2
11/29/2021
2
3
Project Elements
Scoping
Study
Spring 2022
Port
Cleaning
and Clearing
Condition
Assessment
3D Scanning
and
Modeling
Impacts of
Low Flows
4
Project Elements
Scoping
Study
Spring 2022
Port
Cleaning
and Clearing
Condition
Assessment
3D Scanning
and
Modeling
Impacts of
Low Flows
3
4
11/29/2021
3
Barnacle Cleaning
5
•Full Video: https://web.microsoftstream.com/video/7a9d8402-8e45-4981-ab5f-66dbd423f68c
Barnacle Cleaning Clip
6
5
6
11/29/2021
4
•Immediate Repairs
• Replace Tie-Rod
• Repair Concrete Cracks
• Repair Flap Gate Crack
Preliminary Findings
7
Manhole Cover Condition
8
7
8
11/29/2021
5
Cover Removal and Replacement
9
Item Change Value
Immediate Repairs $671,882
Oil Spill Remobilization $155,503*
Total $827,385
Additional Consultant Costs
10
*OC San to work with Legal Counsel to seek reimbursement from the responsible party
9
10
11/29/2021
6
Contract Contingency Total
Original Design Contract $2,744,000 $274,400 (10%) $3,018,400
Contingency Increase Request $823,200 (30%) $823,200
$1,097,600 (40%) $3,841,600
Consultant Contract
11
Recommend to the Board of Directors to:
Approve a contingency increase of $823,200 (30%) to the
Professional Services Agreement with Carollo Engineers,
Inc. for Ocean Outfall Condition Assessment and ScopingStudy, Project No. PS18-09, for a total contingency of
$1,097,600 (40%).
Recommendation
12
11
12
11/29/2021
7
Questions
?