Process Control Systems Upgrades Study
Project No. SP‐196
Presented by:
Mike Dorman
Engineering
Manager
Operations
Committee
July 7, 2021
Master Service Agreement
Supervisory Control and Data Acquisition (SCADA)
Human
Machine Interface
(HMI)
Controller
Industrial Control Systems (ICS) Network
Motor Starter
Pump
No. 1
Pressure
Ultrasonic
Level
Wet Well
Remote Input/Output (I/O)
Flow High
Pressure
Switch
High Level
Float Switch
Monitor and Control Process,
Electrical, Central Generation
and Pump Stations
Record Events
and Historical
Data for
Reporting and
Troubleshooting
Graphical User
Interface to Monitor,
Control and Configure
the Control System
HistorianHMI Servers
2
1
2
7/6/2021
2
Start
Level
Stop
Level
12345678910
LEVEL
Pump
No. 1
ONOFF
MOTOR
STARTER
Feet
Pump Level Control
Controller Remote Input/Output (I/O)
Ultrasonic
Level
3
Human Machine Interface
4
3
4
7/6/2021
3
Human Machine Interface
5
Human Machine Interface
6
5
6
7/6/2021
4
7
Plant 1
Control
Center
SCADA system allows 24-hour operation from 1
location at each plant
Why Replace the Human Machine Interface (HMI)?
•HMI System –CRISP
(Process, electrical and
pump stations)
•>27 years old
•No longer commercially
supported
•3rd party CRISP programmers
are reaching retirement age
•HMI System – Wonderware
(Central Generation and
Load Shedding)
•Replace to have one system
8
7
8
7/6/2021
5
Why Select New Programmable Logic
Controllers (PLC)?
•PLCs – Modicon Quantum
•>23 Years Old
•No longer manufactured
9
SCADA System Replacement Plan
•HMI: Replace now under Project No. J‐120
•PLC/Controllers: Replace as part of future CIP
projects over the next +25 years
10
9
10
7/6/2021
6
Competitive Procurement
HMI/PLC System DCS System
HMI Software HMI Vendor DCS Vendor
Controller PLC Vendor DCS Vendor
Training HMI and PLC Vendor DCS Vendor
Control Panel Panel Fabricator Panel Fabricator/DCS Vendor
Programming In‐House / Systems Integrator In‐House / DCS Vendor /
System Integrator
Competed Human Machine Interface (HMI) and Programmable
Logic Controllers (PLC) versus Distributed Control System (DCS)
11
Fact
Finding
Fact
Finding
PLANNING AND CONSULTANT SELECTION
Study and Procurement
Jan 2017 –Feb 2018
SCADA
Requirements
SCADA
Requirements
‐Workshops
‐Determined
features
‐Procurement
process
‐Workshops
‐Determined
features
‐Procurement
process
OC SAN AND CONSULTANT
Procurement
Documents
Procurement
Documents
Vendor Outreach
and Testing
Vendor Outreach
and Testing
‐Tested vendor
HMI with sample
PLC logic
‐Tested vendor
HMI with sample
PLC logic
Consultant RFP
and Selection
of Stantec
Consultant RFP
and Selection
of Stantec
Issued RFQIssued RFQ
‐Request for
Qualifications (RFQ)
‐Request for
Proposals (RFP)
‐Master Services
Agreement (MSA)
‐HMI Scope
‐Request for
Qualifications (RFQ)
‐Request for
Proposals (RFP)
‐Master Services
Agreement (MSA)
‐HMI Scope
Feb 2018 –Feb 2019
12
11
12
7/6/2021
7
RFQ RFQ
Absolute
Requirements to
Work with Our
Existing System
Absolute
Requirements to
Work with Our
Existing System
QUALIFYING PHASE
RFQ/RFP Procurement Process
Pass/FailPass/Fail
3 Firms Passed the RFQ Phase3 Firms Passed the RFQ Phase
Feb 2019 – August 2019
DCS
ABB
Emerson
Honeywell
HMI
AVEVA ‐Wonderware
Rockwell Automation
Trihedral –VTScada
Firms
Pricing
‐25‐year software licensing
‐HMI replacement (Project J‐120)
‐Total cost to replace all controllers
Pricing
‐25‐year software licensing
‐HMI replacement (Project J‐120)
‐Total cost to replace all controllers
Jan 2020 –
June 2020
July 2020 –
Aug 2020
Oct 2020 (Emerson)
March 2021
April 2021 –
June 2021
TOP
QUALIFIED
PROPOSERS
RankingRanking
Classroom
Trials
Classroom
Trials
Vendor
Interviews
Vendor
Interviews
Ranking /
Selection/
Negotiations
Ranking /
Selection/
Negotiations
RFP
Response
RFP
Response
Scoring
‐Proposal
‐Non‐
Disclosure
Agreement
(NDA)
‐Price
Scoring
‐Proposal
‐Non‐
Disclosure
Agreement
(NDA)
‐Price
SELECTION PHASE
Reference
Checks
Reference
Checks
DCS
ABB
Emerson
HMI
AVEVA ‐Wonderware
Proposers
Feb 2021 (ABB)
(ABB)
(ABB)
13
Master Services Agreement
15‐year agreement (hardware and software) plus 10 years
of renewals (1‐to 5‐year increments)
•Hardware, software, training, and labor based on unit prices
•Work executed through task orders
•Guarantees lowest pricing based on verified costs
14
13
14
7/6/2021
8
Three Task Order Types
Type 1 – Product and Services Task Order
•Supply hardware and software products to OC San
•Provide hourly services to support OC San
Type 2 –Project‐based Task Order
•Implement OC San project scope of work for hardware,
software and engineering/programming services
Type 3 –Project‐based Task Order assigned to Other
Contractors
•Provide field‐side hardware and/or field services to CIP
Contractors
15
Task Orders
•Task Order No. 1: Replace existing HMI software
through Project No. J‐120 (price included in proposal)
•Future Task Orders
•Perform HMI and/or controller programming on future
projects
•Add system features
•Enhanced alarming
•Predictive maintenance
•Integrate Standard Operating Procedures
•Simulation system for training
16
15
16
7/6/2021
9
RFP Scoring
Proposer
Non‐
Disclosure
Agreement
Response
(Pass/Fail)
Price
Proposals
(Max.40
Points)
Project
Delivery
Response
(Max. 10
Points)
Technology
Response
(Max. 50
Points)
Total
Score
(Max.
100
Points)
ABB Pass 40 7 32 79
AVEVA Pass 25 6 34 65
17
RFP Evaluated Pricing
18
ABB AVEVA
J‐120 HMI Replacement
J‐120 Labor and Training $5.6M $42.9M
J‐120 Licensing and Components $2.8M $3.2M
J‐120 Total $8.4M $46.1M
Complete PLC Hardware Replacement $30.2M $11.2M
Licensing (25 years)$9.3M $20.9M
Graphics Upgrade $0.5M $0.7M
Additional Commercial Items $0.0M $0.1M
Total Evaluated Price $48.4M $79.0M
17
18
7/6/2021
10
SP‐196 Recommended Action
Recommend to the Board of Directors to:
A. Award a Master Services Agreement with ABB Inc. for the design,
installation, implementation, and maintenance of a process control
system; and
B. Authorize staff to specify ABB Inc. as the sole source provider for
equipment, materials, software and services for control systems on
current and future projects; and
C. Ratify the addition of ABB Inc. to the list of pre-approved Original
Equipment Manufacturers for procurements under $100,000 for
equipment, materials, software and services for control systems.
19