HomeMy WebLinkAboutItem 12 PPP 07-01-2020 Ops Comm_P2-128 TPAD PDSA Temperature Phased
Anaerobic Digestion
(TPAD) Digester
Facility at Plant No . 2
Project No. P 2- 12 8
�M- Y M `; Kathy Millea, Director of Engineering
MM
MMI
Operations Committee
July 1 , 2020
o�N�y S A N I rq T�O�
cc
.� / iUCTIUYN SAYlR Q /'
CN
-O h
KA�cW
THE ENv\�
� s
an ears o annin -
, .
Biosolids
Plan Project
� � ; `a JUNE27,2018
--. �I _ • �a�cans ..caea�
Seismic • BIOSOLIDS
MASTER PLAN CIP .Budget
Condition �.
:v
Solids Treatment9.
• • �: - —What Makes Up ==WWI
Digesters
Dewatering
_ • Solids Storage
Truck Loading
` - • Dissolved Air Flotation
Thickeners ( DAFTs)
•Op•i
1 J
ZA
Status
of
el.
•\ %: = 18 Digesters
r ` r /' • 40-60 years old
_ • Generally poor condition
• Seismic deficiencies can
not be cost effectively
addressed
♦ `
4
Anaerobic Di estion is the y.
g
Core of Sol ids Treatment Digested
SludgeRaw Raw
Sewage Sludge Digesters
. • • •
r;
naero � c es ion
r�
digesters)
•
digesters)
Height
v
• � P � ��i���1 ,`r AIL ��
_ y
naero � c es ion
Digested
Sludge
1Sludge
1
Biological
W
R
• •Digester
Temperature
* , `
00
O
•
t
r
Market + Tech polo Alternative y.
gy
Combinations Evaluated -
Technology Base Product Final Product End Use
Evaluation
Class B Caloe-
�`° —
Onsite Agriculture
Product Farm - Lang+
Digesters ( )
Technolo ies Application
Class A— Cak�a•- (Bulk)
Product
O n_ ,e r y Class A CalaP-
Tec' �. :es BaseProduc� Dry Pellot5 Horticulture -
(Onsite— Dry+Qr� Bulk Use
(landscape,
Vegetables,
Compost# Plants, etc.)
Dry Pellets
� (Offsite—
Dr�er
Soil Blend's /
.,
%I�K.-0�2 k
Market + Technology
Alternative
a IN
Combinations Evaluated
41
_ .
26 combinations of processing and products with end use
1,
1,000
800
a 600
z
400
200
0
c? yO 5� yQ' S� yQ' 00 5� yO yP yP yP yP yP yP yP eQ' yO eP hP tiP
ayay
c� c� c� c� c� c� c� c� c? c� c� c� c� c? c? c� c� c� c�
QO, QO" QO, �O.
ALT
10
r j
ry
Class A Digester Complex
20myr CIP Plan
x I Lj
P2-132 P2-tS2 P2-1S2 - P2-1S2
-a
'» P2-125- PERIMETER SCREENING
P2-131 P2-1xt Pz-1S2 _ �2P2-13 P2-124- INTERIM FOOD WASTE FACILITY
—QI24
. , 2
2-129 , ' - -' P2-126. RELOCATION OF WAREHOUSE
' P2-121: RELOCATION OF COLLECTIONS
P2-131 i PZ-131 P2-131 J-114 I
J 124 YARD
P2-128: NEW TPAD DIGESTERS
�• P2-128 P2-191 ;' M-131 , P2-131 P 2-128: CLASS A BATCH TANKS
P2-1ze ' ' " P2-128- THICKENED SLUDGE FEED
s
....... FACILITY
2 P2-128: RELOCATE FERRIC CHLORIDE
<7 P24" P2-1M P2-1" P2,29
FACILITY
��— ---- ----- P2-129- REPLACE DIGESTERS P, Q, R, S
�_,�, 1 P2-130: UTLIMATE FOOD WASTE
min 1
FACILITY
P2-1n P2-131: REPLACE DIGESTER HOLDERS
min P2-12a
MIN (I. J B K)
P2-128
�, P2128 j P2-132- MESO DIGESTER DEMOLITION
min 1 X032- TRUCK LOADING REHABILITATION
1 I
I P2-iZT
Pz-,za �
� 11
2017 Biosol ids Master Plan �-y.
� N m m
018 019 O 202 202 202 202 IEEE 202 O 203 2032 03 03 O 03 203 203 203
Plant No.2 Digester Facilities Rehabilitation
Interim Food Waste Receiving Facility
Plant 2 Southwest Perimeter Screening
Plant 2 Collections Yard Relocation
Plant 2 Warehouse Relocation
TPAD Digester Facility at Plant 2
Digester P,Q R, and S Replacement
Digester I,J,and K Replacement
Food Waste Receiving Facility at Plant 2
Digester Demolition at Plant 2
Graphicfrom: • • • • -ct SP15-01 Information • • . • Operations Committee, April 5, 2017
L
Temperature Phased Anaerobic
Ir W.T i lr+t
Digestion (TP D)
j
• High pathogen kill / Class A capable
• Increased solids destruction and gas production
• Increased process complexity
131 ° F416, 98 ° F
—�
j
Batch Tanks
Thermophilic Mesophilic
digestion digestion
glum,
ass vs ass
M: Digested
Sludge
•�'-'''�%%%!off ���as�
Sludge i • • •
Digester Gas
Temperature
Time
��
Class vs Class B
Class B Biosolids «xisting) Class A Biosolids (Proposed)
• Mesophilic Digestion (98 deg) Thermophilic Digestion (131 deg)
• 15 days 24-hour hold time in batch tanks
• Key Reuse Options Key Reuse Options
• Non-Food Crop Application
(Arizona, not California) • Food Crop Application
• Feed to compost (California, Arizona)
• Landscaping amendments
• Feed to compost
15
• r
. s
�. N•�.•...,,�, �•_`;�� - � y,.,j, �'�-- iris
`� -�_ bra: `�'4l, . � �•<��/ii3 ='"�....���C, �•'�'` h .t �„� It `
1 ��' �-a •s � ., _ •`
4 I .
i:, dpll I
I,
L
"AT
AV
Ilk
h
V Ie ;I (� C
i gg
Class A TPAD --y
Diqester Com lex
FIR
19 21
41
18
r
7'
z� �F
r t
. :.tyre
R
Z ♦r+n� .. �'hv
Class A TPAD --y
Diqester Complex ;
r--
I W
_
'F!'1w _
� ,.
_- ,.
,, -
.W
19
Class A TPADy
Digester Complex -_
1. Perimeter Screening
2. Digester Feed Facility
3. DFF Odor Control
- 2 3 4. Thermophilic Digesters
- -_ �
-�- 5. Boiler Facility
6. Emergency Overflow System
7. Class A Batch Tanks
8. Sludge Cooling
9. Power Building
4 5
RIM
1
/ 20
9` ; M"
Selection Process
ZA
Design Services Request For Proposal Activity-January 24, 2017
Project Name Mad PSA Project Manager Scope Construction
RFP Estimate
P2-123 Return Activated Sludge Piping Mar-2017 Rich Leon This project will replace return activated sludge piping at the Plant 2 Oxygen Activated Sludge Plant $5,000,000
lacement at
t 2 from the
dary Clanfien;to the RAS Pumps.
• Jan 2017 P22--122 Headworks nModifications at Plant 2 for Jan-2017 Shahrzad Namini Modify Plant 2nas needed to provide separate treatment for flow streams that are not currently suitable $25,300,10W
GWRS Final Expansion as source water for GWRS.
J-124 Digester Gas Facilities Rehabilitation Mar-2017 Victoria Pilko The project will modify,rehabilitate,and repair digester gas handling facilities at both Plant 1 and Plant $53.400.000
2.Facilities affected include low pressure gas vents on all oigesters,new gas compressors and
Start of Consultant pryers and a low pressure gas flare system to replace the existing high pressure system with a low
pressure system.Sections of the gas Dieing need modification to manage condensation and corrosion.
The work may include replacement of the existing gas compressor buildings at both plants,but at Plant
1,a temporary gas compressor facility may be needed to allow reuse of the existing gas compressor
building.
outreacheffort 5-67 Bay Bridge Pump Station and Forcemain May-2017 Adam Naxarolf This project will replace and potentially relocate the existing Bay Bridge Pump Station.The Bay Bridge $26,500,000
Replacement force mains from the pump station to the west side of Upper Newport Bay will also be replaced and the
size increased.
7-65 Gisler-Red Hill Interceptor Jan-2018 Wendy Smith This project will rehabilitate the Gisler Redhill Interceptor from a diversion manhole near the Main $9,600,000
Rehabilitation Street Pump Station to the College Avenue Pump Staton.The protect is expected to line or repair 38
manholes antl roximate 15 000 feet of VCP sewer in Costa Mesa.
1-101 Rain and Bristol Street Sewer Extension Jan-2018 Wendy Smith This project will replace 2,360 linear feet of 21-inch City of Santa Ana sewer with a 24inch Sanitation $7,800,000
Districts sewer line and a parallel 8-inch City of Santa Ana sewer line to allow for redirecting all house
lateral connections-The sewer line is located along Myrtle Street.between Rain and Bristol Streets in
the City of Santa Ana-The project also includes rehabilitating 910 feet of 18-nch VCP,7,075 feel of 21-
inch VCP,and 2,570 feet of 24-inch VCP pipe and associated manholes in Bristol Street and Ram
Street.
• Jan 2020 P2-128 Digester Process Upgrades at Plant 2 Aug-2017 Jeff Mohr This project is the largest of a set of related projects to replace the mesophilic anaerobic digesters at $260,000,000
Plant 2 with new digesters in a temperature-phased anaerobic digester(TPAD)configuration-This
project will include six new themophilic digesters,batch tanks,coding facilities,and associated sludge
pumping,digester mixing,power distribution,and controls.Replacement and demolition of existing
i i esters will be includetl in a se rate ect.
Advertisement 7£3 MacArthur Pump Station Rehabilitation Jan 2018 Wendy Smith This project will rehabilitate the existing Ma Pump Station farce man W and upstream gravity $4,700,O
system pipeline and manholes(approximately
2,0 2,000 linear feet of flinch pipe and eight manholes).
The existing station is located in the vicinity of John Wayne Airport in the City of Newport Beach.The
work includes bringing the pump station into compliance with the latest applicable electrical and safety
codes and replacing maintenance-intensive pumps.700 feet of the nearby Von Kaman Trunk Sewer
(located in Campus Drive north of me pump station)will also be upsized as part of this project.The
sewer,which is a 12-inch vitrified clay pipe(VCP),will be upsizeo to 15-inch in diameter,
2-73 Yorba Linda Pump Station Abandonment Fetr2018 Wendy Smith This project will abandon the Yorba Linda Pump Station and downstream force main-Gravity sewers $3,800,000
located in Yorba Linda Boulevard will also be reconfigured to improve access to the facilities for
maintenance.Flows which are currently being pumped by the Yorba Linda Pump Station east will be
conveyed by gravity,through the newly upsized Newhope-Placentia Trunk located in State College
Boulevard to the west.
21
�k.. election Process
• February 2020 -
Preproposal Survey -
• Two major firms teamed ' _
• One team dropped last ® -
minute -
• Other firms had insufficient
resources -
• March 2020 -
..,�.•- ....�.-•• R
One Proposal Received
22
:v
Brown and Caldwell ' sPr
opaaaLAL. 1 ;ter.
• Exceptionally strong team
• very clear understanding
• Effective plan to execute the project
• Directly related experience
• Team includes 13 Subconsultants (49% of Fee)
— BLACK&VEATCH Ck ALTA BGB DESIGN GROUP
• at Plant ENVIRONMENTAL
- - [ bantlscape ArcbitecWre Planning Urban Design
AN N V J COMPANY
-- a next-generation C� CORROSION PROBE,INC. KDM hJhq
htlRlln;�N moffatt & nichol
digester facility
)
(K/NFELOER JENSEN HUGHES
�- Ad--,g the S —,of S,fety
y �w
r r
FSA `q 2 AIity
vu J engineers
1�
Negotiations
I a-„
Original Proposal Negotiated
Total Hours 191 ,567 185,663
Total Fee $3%810,783 $395300,000
• Over 20 meetings held with Consultant with over 50 hours
to conclude negotiations
• Clarified project elements and design assumptions
• Ensured scope and level of effort are appropriate
• Adjusted some tasks to improve design and reduce
construction risks
1�
Proj' ect
r Preliminary UNDER
CONSTRUCTION
BIDS&RFPS
f
Board Award Preliminary Advertisement Construction Construction
Design Complete for Bids Start Completion
Jul 2020 May 2022 Nov 2024 Jun 2025 Nov 2030
Recommendation
• Approve a Professional Design Services
Agreement with Brown and Caldwell to provide
engineering services for Temperature Phased
Anaerobic Digestion (TPAD) Digester Facility at
Plant No. 2 , Project No. P2- 128, for an amount
not to exceed $39 ,300, 000 ; and
• Approve a contingency of $3 ,930,000 ( 10%) .
HSv 5ANIr
r2
e rac
O x