HomeMy WebLinkAboutItem 10 PPP 02-05-2020 Operations Committee - J-98 7 " Electrical Power
y 91�141Distribution System
MIA
y
Improvements
Project No . J -98
=.. Todd Waltz Project Manager
g
wl
Operations Committee
AFebruary 5, 2020
im
nCY I
"AACD(
Projoect Elements
1 . Plant No . 1 Load Shedding
2 . Arc Flash Reduction
3 . Replace obsolete equipment at
Plant No . 2
ZA
Projoect Elements
1 . Plant No. 1 Load Shedding
2 . Arc Flash Reduction
3. Replace obsolete equipment at Plant No. 2
� ,. -:- - a -�-.n..�-Syr=„■=
.uY d► i� �"1�-� , Irr
�-
!+«
HEADWORKS
� �� �*M. � �� �4 .. PRIMARY
sCou1HERNCCALIFORNNIIAI � !old+-- 1 _ TREATMENT CENTRAL
J E D I S O N _ PRIMARY
■ TREATMENT rGENERATION
An ED/SON INTERNATIONAL°Company � ,
DIGESTERS
Central Generation
SECONDARY
�:.• TREATMENT
�•- - TRUCK LOADING
SANITglTOy I ; SECONDARY SECONDARY CENTRIFUGE
TREATMENT TREATMENT
2 9 AM VA
Q
c INV
• • * AL AdIL
AIL Alk
r/�� THE EN�\� LmnL P ER f ' .
-.-0�2 k
Projoect Elements
1 . Plant No. 1 Load Shedding
2 . Arc Flash Reduction
3. Replace obsolete equipment at Plant No. 2
HEADWORKS
PRIMARY
SOUTHERN FORNIA
SON , vk,;�• T e =ri �I TREATMENT CENTRAL
ow
PRIMARY
n ED INTERNATIONAL'Compare
■ TREATMENT 1GENERATION
' r DIGESTERS
Central Generation SECONDARY
TREATMENT
t TRUCK LOADING
V
SANITgl SECONDARY SECONDARY CENTRIFUGE
JJJ� TO,t £ TREATMENT TREATMENT
(4 �j Amok 11� i
11
9 Ad VA
o
Vr A
rr
Ah AdVA
cr/�� THE EN�\�o rUTILITY POWER
,A x
N
L.L
4-0
S• r
r
rZ_ E
o
�I A 1 111111
� U V-H+J ►11111
111111
O O
O
CD
V/ \,
Z .10 U
Q
Q ry
N CY)
Projoect Elements
1 . Plant No. 1 Load Shedding
2 . Arc Flash Reduction
3. Replace obsolete equipment at Plant No. 2
' ,Ez.raAEKA °
I. .
'EL EOCF AC
ZA
�k.. election Process
• Five firms submitted proposals
• Conducted interviews with top two
• Recommendation : Brown and Caldwell
rig
qq r a
:ram l I
III �
L
Negotiations
Original Proposal Negotiated
Total Hours 15,288 133022
Total Fee $23561 J44 $232403000
• Reduced total number of drawings
• Reduced assumed level of effort
rj 4
•Recommendation
Approve a Professional Design Services Agreement with
Brown and Caldwell to provide engineering services for
Electrical Power Distribution System Improvements,
Project No. J-98, for an amount not to exceed
$2,240,000; and
• Approve a contingency of $224,000 ( 10%)
Poo,
Questions ?