Eros Yong, Engineering Manager
Operations Committee
March 4, 2020
I �
PAL •• •
- {3
nCY I
'^.CDl
Why is Asset
Management
Im ortantl.
' `?
Sewage Woes Make For Stinky Holiday In Fort
Lauderdale Neighborhood
FOX4 NEWS
By SUSANNAH BRYAN - DEC 23,2019
It's never a good time to have sewage flowing through the
streets.But three back-to-back sewer main breaks have cast a
toxic and smelly shadow over Fort Lauderdale's Rio Vista
tt� neighborhood at one of the worst times ever—right before • • • •' • • '• • '
the holidays. • -• • 000
AMY BETH BENNETT/SUN SENTINEL
SEWER SPILL
- Another Sewer Main Break In Rio Vista
OLETA RIVER y 111 Neighborhood
STATE PARK
By DOUC LIPS DEC 20,2019
HAULOVER BEACH
The plague of sewer main breaks in Fort Lauderdale continued
r Friday with word of another break in the Rio Vista
IU
neighborhood.
BALHARBOUR Shortly after 5 a.m.the city announced that a sewer main
break happened near Virginia Young Park,1000 SE Ninth Ave.
SOUTH FLORIDA SUN SENTINEL The location is just north of the Tarpon River.Another leak,
+ 111
that happened earlier this month,was to the south along
Ponce De Leon Dr.
What is
Asset Management
?
Lam'
What is
7w
t?
Asset Managemen
I Eli
1 . What do we own?
2 . What condition is it in?
3 . What is our plan to operate ,
maintain , rehabilitate and replace
our assets?
1�
fi Asset Li Cycle
Rehabilitate Plan and
or Replace Budget
Asset Design and
Monitoring Construct
Operate
and
Maintain
1�
Asset Li Cycle
i
Rehabilitate Plan and I�
or Replace Budget
Asset Design and
Monitoring Construct
Operate
and
Maintain
1�
Asset Li Cycle
Rehabilitate Plan and I
or Replace Budget
Asset Design and
Monitoring Construct /
m
U a
r �
Operate
and
Maintain
Asset Li Cycle
Rehabilitate Plan and I
or Replace Budget
Asset Design and
Monitoring Construct /
m U �
Operate
and
Maintain
3 4 '5 .° 5016 0
,40
® 6 30
tl► :�aoo 7 . t/t .20
— Service .10
8 , Engine Oil r
ro�ur�nc ,
Asset Li Cycle
Rehabilitate Plan and I
or Replace Budget
• — Asset Design and
Monitoring Construct /
Operate
and
.- Maintain
3
AID
— t
: m67 . ✓ 20
�'aoo
6 = Service 10
Engine Oil -r
8
4—m—e—
Asset Li Cycle
INA
1.
i=1 I I I it�•
:...w Rehabilitate Plan and
or Replace Budget
• — Asset Design and
Monitoring Construct /
�4 Operate
and
.- Maintain
3 4 'S ° ,50
A-- ��- y 30
,40
- : m67 . ✓t 20
�'aoo
6 = Service .10
Engine Oil -r
8
4—m—e—
:v
OCSD Assets
Valued
at $ 10 . 7 Billion
OCSD
Service Area
LA
HABRA BREA
YORBA
FULLER T N LINDA
PLAC TIA
LA Bi IENA r
P LM4 RK
ANAHEIM
PRE S VILLA
PA
LOS NTO
ORANGE
A MITOS -
D
RE S
OV
SEAL
BEACH MINS ER Pm
m
SAN
F UNT ANA TUSTIN
Reclamation Plant No. 1 AL`�
HUNTI GT
� IRVINE
Treatment Plant No. 2 MESA
Emergency Outfall
1.5 mile long NEWPORT
6.5-foot diameter BEACH
Offshore Outfall
5 miles long
10-foot diameter
1 111 Vs . $ 10,700,000,000
Typ 'lcal Asset
m t P
anaqemen roqram
i • Theoretical
■ • Outside consultant
' • Infrequent updates
� ' • Provides rough budget
projections
„ 'b • Product is a report, not a plan
A
' Project prioritization could be
biased
s sse --y
vzi* C
FrI'F. o L;I 11 VW4 11 a ILO ram
.-ORO Tactical
Dedicated in-house staff
Continuously updated
Product I plan that specific,
coordinated , efficient, well
thought out
2 019 ASSET x -
MANAGEMENT �PLAN - More accurate budget projection
Orenge County Sanitation District,Cali/ornia
Project prioritization based on
December 2019
condition
Know What We Own
4 1
andI VW,
rim
X-f - >% 0
Mr�-, Ifl 0)
J .:AL
•
r .M- ♦ LU • CS 6
Effluent Piping 2 - 3 3 4 4 - - - - 4
Structural
Building 2 2 2 1
.. t Structure 2 4 3 3 - - - 1 1 1
,rAk Mechanical
Pump 2 - - - 3 3 - 2 2 - 3
Aerator - 4 - - - - - - - - -
Piping and Valve 3 3 3 3 3 3 3 2 2 3 3
Clarifier/DAFT Moving Mechanism - - 5 - - - - 2 - - -
^^'^ ►f Channel Air Blower - - - - - 4 - - - - -
'`1A;" Control Gate - 3 5 3 - - - - - 2
LOX Facility - - - - - - 3 - - - -
° f HVAC &Ventilation 2 - - - 3 3 - - - - -
r .. Crane 3 - - - - - - - - - -
Electrical
MCC & VFD 4 3 3 - 4 4 - 3 3 3 3
Instrumentation
PLC & Flow Meter 3 3 3 - 3 3 3 3 3 - 3
RUL Legend:
11 RUL<5 years 11 RUL 5-10 years RUL 11-15 years ❑RUL 16-20 years RUL>20 years
%I�K.-0�2 k
20 =Year Plan for
4`All A t 7iZi
sse s
tW_
Current and Future Projects
N M 1* In W 1- 00 0) 40 N logo
Project No. Project Tit ejd Impacted Facillitilesi CD V_ C4 M V w CO r- W CD N M V
.Am& — ----a A�
MP-248 Plant No. 2 Secondary Clarifiers D, G, Secondary clarifiers
L, J, F, C Repairs
PRN-00457 Activated Sludge Plant Clarifier Inlet Secondary clarifiers
Gate Replacement at Plant No. 2
P2-122- Headworks Modifications at Activated Sludge facility,
P2-122 Plant No. 2 for GWRS Final WSSPS
Expansion
P2-123 Return Activated Sludge Piping RSS pump stations and
Replacement at Plant No. 2 secondary clarifiers
PRN -00573 Plant No. 1, Plant No. 2, Collections PEPS, RSS pump stations
MP-513 VFD Drives Replacement
X-50 Activated Sludge Aeration Basin Activated Sludge aeration
Rehab. at Plant No. 2 basins
Activated Sludge
X-52 RAS/WAS/PEPS/Vaporizers Activated Sludge facility
Rehabilitation at Plant No. 2
PRN-00572 Plant No. 2 AS Plant Clarifiers Secondary clarifiers
Rehabilitation - Phase 2
Types of Project Legend:
❑ CIP -Planning ❑ CIP—Design CIP-Construction ❑ Maintenance Project
Example : Plant2Activated
Slud e Clarifiers
91,
Broken Clarifier Mechanism
Corroded/Broken
'Nib
- Inlet Gates
♦ ��/�. /,/ i�.�J 'yam
�sT] Insufficient Lighting
Example : Plant2Activated
Slud e Clarifiers
9
Critical Assets
Condition
_AMR_ J11111111111111111
Clarifier Mechanisms ? Comprehensive Rehabilitation Project
Inlet Gates ? • Budget: $17M
Area Lights ? • Duration: 7 years+
Clarifier Structure ?
Clarifier Motor and Drives ?
Meters and PI-Cs ?
Example : Plant2Activated
Slud e
Clarifiers
9rj
i %WN;
Clarifier Mechanisms Cnmr.re.hensaye RehaboletateeR Drnio�t
Inlet Gates Q, ,,lao+: �1 7M
Area Lights Four small projects. Total Budget: $7.2M
Clarifier Structure 3 Monitor condition, repair/replace as
Clarifier Motor and Drives 3 needed
Meters and PI-Cs 3
Example :
Plant 2 Activated
S;j
Clarifiers -y
Critical Assets-A11111119- Condition A111111111111111111Plan _M
. . . 1
Inlet Gates . .
Area Lights Four smallprojects. Totali •
Clarifier Structure Monitor • . •
Clarifier Motor and Drives needed
Meters and PLCs 1111111ME!
Asset Management Benefits:
❖Addresses risks more quickly and efficiently
❖ Minimizes impacts to operations
❖ Minimizes life cycle costs
OCSD is a Leader min
A t M sse
I Le , t j
emen
Known Asset Comprehensive 20-year CIP Rate structure supporting
Replacement Value 20-Year CIP Outlay the 20-year CIP
;so
4
$ 10e7 a,
assets
a
�Roposetl ClPOullayfar BoaNAUMaIaetl Pialects �FUWreCR RehabililaWnor ReplacenerK
Comprehensive condition
assessment program Tactical Asset Management Proactive Maintenance
1
uestQi ons ?