HomeMy WebLinkAboutItem 5 PPP 03-04-2020 Operations Committee - PS18-09 7 f { �•'� Ocean Outfall
Condition Assessment
rilly and ScopingStudy
Project No . PS1 8-09
I _ Valerie Ratto, Project Manager
Awl
Operations Committee
;�. March 4, 2020
nCY I
"AACD(
:v
Ocean Outfall
0' 7-
z
H�ntington m `z 2 N I ESA
Beach V V"ILTON ev Q
Pier p� HMNEL
w
cp ` OCSD
TREATMENT
PLANT NO. 2
m
,,per
Emergency Outfall MEMIG°p Gib'
1.5 Miles Long o 6 H
78-Inch Diameter
Pacific Ocean Rr��►
Newport
Pier
N
A
0 0.5 2 rdilus
1 i I I
Offshore Pipeline
5 Miles Long
120-Inch Diameter
Extreme Flow Events
Average Monthly Flow MGD vs. Peak High Flow Events �
600
550 563
550 521
500 485
494 501
475 459
450
411
400
350
300 266 (1990) 184
_O
LL 250 (2018)
200
150
100
1980 1985 1990 1995 Year 2000 2005 2010 2015
0 Total average flow 0 Peak Flow
•:
Outfall Des 'ign ate-- ►+` 1ai
Mm
.........
-r•
'i.,
.......
M .
. . ........
1
Diffuser Ports "
' Ballast
End Structure / Y�ii{�3„yyL
,l
a
/000 FT. 78" OCE.4v OUTFALL
.DIFFUSER W/TH G" PORrS
/966
MA
Outfall Construction
1 -7
1
_4
� r -
_ '"► i.i
� .fir•"� ,�47r:i t t'1�f._ _ �� _ •',
r
1 •
-j
Outfall
r
f _ , ! -;
` o :
Cutfall Construction
Iwo
.a.
47A
q
AS The REGISTER Tuesday(m)December 3,1968
968 = 1 Ocean Outfall Job Cost 8 948$ , 000
CONTROVERSIAL CONTRACT LET; 2-YEAR COMPLETION
FOUNTAIN VALLEY—Direc- Directors also approved ex-1 remainder will be financed pro-remembered to onclose a Corti- An attorney for Healy,Ryan
tors of Distrtct 1 of the county tension of the contract date to portionately by taxpayers in Pied cheek. asked that the firm be given the
Pe contract to scheduled to begin. I D strict 1 was named
and 11 At a special meeting Oct.I6 bid or that all bids be rejected
sanitation districts Monday Jan. I6, when construction is Districts I,2 3 6 6
awarded a$8,998,000 as agent Nissen said the districts are not and the project readvertised.
ter Kiewit Sons,Inc.,of Rich- The Water Poll r Connn t tic mi D zcti o ci_: „, 1 6rd �.I T)„ ;,;.,,
mond for construction of an Admvnstratiorr
ocean outfall at the mouth of the De arEmer� tr:4Ii ttf iE�Lltit[�
King—.1lie Ph66—in—g )OW"ner Wad _- p p rill l
the Santa Ana River. .pay$3,374,5s0
By BRUCE TAYLOR line five miles long before the effluent one mile offshore.Fi- and rain.The Davey Crock
Register Staff Writer job is completed next spring. not sections of the 10-foot-di• almost was Wp-,Jo shore
Three miles offshore from The Liberty Ship,the Davey ameter pipe line will be
the mouth of Santa Ana Riv- Crockett, was converted for 'red 198 feet below the The REGISTER Sunday,November 7, 1970 D7
er, men and machines are laying pipe last year in Rich- surface.
struggling to complete the mond, Va.The vessel is 440 Work began on the h
most tedious, if not the big- feet long and its crane reach. pipe line project in Jan �fw�1Cost,plumbing job in Orange es 10o feet above deck level. 1969 Completion is ez � � Himls '�7
County history. It has the largest pipe-laying early next spring.
Mammoth sections of con- ocean platform in the world. Workmen assemble at
crete pipe are being fitted No longer self-powered,the break on the long trestle
together on the ocean floor 70 Davey Crockett is moved by a where they board a tug
feet deep. system of cables attached to which delivers them to ` _
Rugged men suited in red six 4-ton anchors on the ocean side of the Davy Cr Sewer To The Sea" Labeled
safety vests and bright yellow bottom. There,they climb iron
hard hats each day manipu- The ship and men work for on the ship's side to
late the 86-lon pipe sections Peter Kewitt and Sons, the where they disburse
from the deck of a converted prime contracting company to up work positions.
World War II Liberty Ship the Orange County Sanitation Ideal conditions se
into the water. District. The firm is laying 1st on the open oce As
'E n h a n e i n ' ,� Water
On the ocean floor,the 10- the $10 million ocean outfall 22-month history of foot diameter pipe sections system which will replace the laying p r o j e c t
must be fitted end to end in a existing one now discharging plagued by high se
s.
4
4"
r '
r, m s.
a
/ lar" 011 '
MONSTER OF DEEP—Ron Capps applies point to 108-inch ocean outfall section
i
so divers joining sections 190 feet below surface can see them more easily.
65-TON PIPE SECTIONS LINE DECK OF WORKSHIP DAVEY CROCKET Times photo by Dtaxine Hearne
ZA
Outfall Tidal ►�`
Ballast
Pipe Joint
PREc-�grTOR • �_ -_
Ballast
Manhole
Diffuser Ports
Ottr +�
Diffuser-Inshore Side
Diffuser-Inshore Side — Diffuser-Inshore Side - -
-- Diffuser-Offshore Side —= Diffuser-Offshor '� r = Diffuser-Offshore Side
End S
t �
4
i i• • •
r 1
t
J
� a
•
tr
_ I ,
L •x+yh : !It
r
mr
G
Projoect Elements
• Condition Assessment
• Port Cleaning and Clearing
• 3D Scanning and Modeling
• Impacts of Low Flows
Projoect Elements
• Condition Assessment -�--�
• Port Cleaning and Clearing '`°°� �
3D Scanning and Modeling
• Impacts of Low Flows
Projoect Elements
_jW
• Condition Assessment
• Port Cleaning and Clearing
• 3D Scanning and Modeling
• Impacts of Low Flows
: Y —
J
rr9,ro •re Si46
r
Inshore Side Diffuser - Offshorz;.
Diffuser
s
i
I
Projoect Elements
• Condition Assessment
• Port Cleaning and Clearing
• 3D Scanning and Modeling
• Impacts of Low Flows
_ r
is
�.r
y sxy.
ZA
Projoect Elements
• Condition Assessment
• Port Cleaning and Clearing
• 3D Scanning and Modeling
• Impacts of Low Flows
r
Effluent ...'�".
:v
Project Elements
• Condition Assessment
• Port Cleaning and Clearing
• 3D Scanning and Modeling G W R S
•• uou"wou ent�erri inH.
• Impacts of Low Flows Tostes like water..
becouse it is water!
Effluent
` """"
ZA
Selection Process
. - - ---
_ , • Two proposals received
I A to Me A
c�= • Interviews conducted with both
firms
• Carollo Engineers Selected
C'
MM
Negotiations
Original Proposal Negotiated
Total Hours MT 8,302 811042
Total Fee $3,139,295 $2,744,000
• Reduced resolution for 3D Model
• More detailed low-flow modeling
• Eliminated interior sampling
• Revised testing requirements
Fee Breakdown
Prime Consultant $950,000
Other Subconsultants $140,000
Exterior Inspection (Divers) — 57 Days $420,000
Interior Inspection (Remote Vehicle) $400,000
Port Cleaning (Remote Vehicle) $330,000
3D Scanning and Modeling (Submersible) $500,000
Recommendation
• Approve a Professional Services Agreement with
Carollo Engineers, Inc. to provide engineering services
for the Ocean Outfall Condition Assessment and
Scoping Study, Project No. PS18-09, for an amount
not to exceed $2,744,000; and
• Approve a contingency of $274,400 ( 10%).
1�