HomeMy WebLinkAboutItem 09 PPP 12-04-19 Operations - Seal Beach Pump Station 3-67 Seal Beach
�- - Pump Station
Replacement
-� Project No . 3-67
Justin Fenton, Project Manager
Operations Committee
�- December 4, 2019
f ,�
EE. MLE
RU �A
AMOK
Projoect
Location
• City of Seal Beach SO TH WT
AN I S WES
Cypress
Los Alamitos Stanton
California
State Joint Forces Training rb
University Base Los Alamitos J9
• Intersection of Long Beach
0 Rossmoor
Seal Beach Blvd & D 19
o 0
Westminster Blvd MARINA Seal Beach Pump Station
PACIFICA Westminster
QNaval Weapons
Station Seal Beac
Seal Beach
Nations! Midway City
Seal Beach Wildlife
0 ,„ge 39
GOLDLNWCST
L: -A
• ckground
7w
• Constructed in - = -.
1973 Westminster Blvd
• Provides service
for the following
cities : `
• Seal Beach
• Los Alamitos -
• Cypress
w-
• La Palma
Seal Beach Blvd /
• Rossmoor
(unincorporated)
-`so*—
c -A
W� 7 aW4
Proposed Pump Station Existing Pump Station
1
s - -
P %W.acl
• �=
71&3 1,
• New pump
station with - - "
improved :
• Hydraulics
• Storage
• Odor control
• Aesthetics
(Mission Style)
• Site Access - -
• Security
� _A
cess
• Six proposals �t
received . .... ...
• Interviews
conducted with
top two firms ,.
• LEE & RO , Inc.
selected
s L
Negotiations
Original Proposal Negotiated
Total Hours 26,684 299456
Total Fee $5,496,714 $5,947,850
• Clarified project elements and design assumptions
• Ensured scope and level of effort are appropriate
• Expanded some tasks to improve design and
reduce construction risks
s i
r
Recommendatu-TiA
• Approve a Professional Design Services
Agreement with LEE & RO , Inc. to provide
engineering services for Seal Beach Pump
Station Replacement, Project No . 3-67 , for an
amount not to exceed $5, 947 , 850 ; and
• Approve a contingency of $594 , 785 ( 10%).
Li-31
ply �•' �1
Questions