Loading...
HomeMy WebLinkAboutItem 09 PPP 12-04-19 Operations - Seal Beach Pump Station 3-67 Seal Beach �- - Pump Station Replacement -� Project No . 3-67 Justin Fenton, Project Manager Operations Committee �- December 4, 2019 f ,� EE. MLE RU �A AMOK Projoect Location • City of Seal Beach SO TH WT AN I S WES Cypress Los Alamitos Stanton California State Joint Forces Training rb University Base Los Alamitos J9 • Intersection of Long Beach 0 Rossmoor Seal Beach Blvd & D 19 o 0 Westminster Blvd MARINA Seal Beach Pump Station PACIFICA Westminster QNaval Weapons Station Seal Beac Seal Beach Nations! Midway City Seal Beach Wildlife 0 ,„ge 39 GOLDLNWCST L: -A • ckground 7w • Constructed in - = -. 1973 Westminster Blvd • Provides service for the following cities : ` • Seal Beach • Los Alamitos - • Cypress w- • La Palma Seal Beach Blvd / • Rossmoor (unincorporated) -`so*— c -A W� 7 aW4 Proposed Pump Station Existing Pump Station 1 s - - P %W.acl • �= 71&3 1, • New pump station with - - " improved : • Hydraulics • Storage • Odor control • Aesthetics (Mission Style) • Site Access - - • Security � _A cess • Six proposals �t received . .... ... • Interviews conducted with top two firms ,. • LEE & RO , Inc. selected s L Negotiations Original Proposal Negotiated Total Hours 26,684 299456 Total Fee $5,496,714 $5,947,850 • Clarified project elements and design assumptions • Ensured scope and level of effort are appropriate • Expanded some tasks to improve design and reduce construction risks s i r Recommendatu-TiA • Approve a Professional Design Services Agreement with LEE & RO , Inc. to provide engineering services for Seal Beach Pump Station Replacement, Project No . 3-67 , for an amount not to exceed $5, 947 , 850 ; and • Approve a contingency of $594 , 785 ( 10%). Li-31 ply �•' �1 Questions