Primary Treatment Rehabilitation at Plant 2, Project No. P2-98
6/C-Side Interim Repair at Plant No. 2, Contract No. P2-986
Operations - - Presentation
January • 2019
Presented by Rob Thompson
rHE
...mow
Emmiu-
Plant 2 Site Plan
P2-98 Project Area �
,Operations Center
•l
%
ar it
Okh
�'',• , : ? Sty.. __ � � �� Q ,I,;� , �o
Io
.t P
Major ro ec emen s
I I ^� SOUTH SCRUBBER ,
• A B a n d C S i d e 1 COMPLEX
DISTRIBUTION STRUCTURE A
Primary Clarifiers NORTH SCRUBBER
COMPLEX
( 14 tota I )
B SIDE ASIDE
• Odor Control --
C SIDE
DISTRIBUTION STRUCTURE B•
Power Distribution00
• Utility Tunnels r _ AL -J:
• Ya rd Piping DISTRIBUTION STRUCTURE C �
A=Side PrimaryClarifiers Require
Replacement
• Built between 1960 and -
1963
• Portions of structures have
severe corrosion
• Failed clarifier mechanisms t
• Subject to liquefaction in
earthquake
Y
I,
t.:
t
0
Al PRIMARY :PRIMARY `
CLARIFIER P ,♦�'CLARIFIERO ��� '\
C ♦♦ mn
B PRIENR/
PRIMARY ♦� - —
CLARIFIER - CLARIFIER is
-
M N+ ..,. SfmPl
KPRIMARY '♦ )
CLARIFIER PRIMARY PPoMARV' ♦♦� L' - \
CLAPoFIERK CLARIF16
IER)
�o uuooEu Auumno ♦,♦;� _iT�I`` L rolL
�
PR-RY PRIMARY PP PRIMARY
,`. CLAPJFER L CLARIFIER 1 - CLARIFIER H 1 f^` mh
i U
PRIMARY CLARIFIERE r �S'.' r —■
• `.� CLARIFIER FAULT I
OSOLIDS FAULT, ��
ER L� '. '
DIGESTER) DIGESTER:
7: DIGESTER D� G. `
�Fy PRIMARY O
CLARIFIER D
ER M DIGESTER K OKESTER E�DIGESTER C
' " • a i e �F Z
.0
RO� DIGESTERN-- 'DIGESTER H� DIGESTER F /'1`'
CLARIFIER F t, CLA dFPRI�IER G f"" ` ► H• c
OKSESTER R. ///��� r
N CL
00 Q
D
Why Move the A=Side Clarifiers ?
• Avoid construction over active fault.
• Existing A-Side clarifiers remain available during
construction — avoids delay of OCWD GWRS Expansion .
• Frees larger area for future secondary process to
replace aging Activated Sludge Plant
B/C =Side Clarifiers Require
Rehabilitation
• B-Side built between 1967 and 1972
I f
• C-Side built between 1983 and 1985 _
• Mild-to-moderate structural damage
from corrosion
• Corroded clarifier mechanisms and cover
supports
PHASED PROJECTS FACILITATES
CONSTRUCTION
P2-98A: Replace A-Side
primary clarifiers; new
odor control system and 2 -98A
power distribution; and
infrastructure Design Construction
improvements
P2.98B: Provide short- N N N N N N N N N
term repairs (15-year life) o 00 ko o W Ln
o
for B/C-Sides primary Design Construction
clarifiers
P2-98C (now P2-133): vz -�MB
Provide long- term repairs
(+20 years) for B/C-Sides Construction starts 2029
primary clarifiers and new
odor control system
BIC =Side Interim Repair at Plant No. 2
Contract No. P2=9813
Major Contract Elements
• Repair of cracks in concrete pipe and structural
walls.
• Repair of clarifiers' steel mechanism .
• Lining of process piping .
P2 =98B : Clarifier Concrete Repair
I
�/r"w"/yj, 71 11111 a I
J_ n
b PRIMARY CL4AIFIER
tA
.y . . - 140'DIA
P2 =98Bm. Concrete Pipe
Corrosion
r
96-inch Concrete Pipe Repair 96-inch Concrete Pipe Repair
Reinforcing steel exposure in crown Reinforcing steel exposure
I _
Typical Mechanism
A Aww
.._ ............
�- =ram l �'( �'L.'., _ -t _ - r _ _ _f•
P2 =9813 : Clarifier Steel Corrosion
r � b I •'
IW
F'
Structural steel around
the center column
(,A De-lamination it
Dome supports at Clarifier
P2 =98B Bid Results
Bidder Amount of Bid
Myers & Sons Construction, LLC $81665,000
Shimmick Construction Company, In $8,755,500
$101055,000
$11,365,426
Stanek Constructors, Inc.
Abhe & Svoboda, Inc.
Tharsos, Inc. $12, 151,406
Recommendation :
PCSA
• Approve a Professional Construction Services (PCSA)
Agreement with Black & Veatch Corporation to provide
construction support services for B/C-Side Primary
Clarifiers Interim Repair at Plant No. 2, Contract No. P2-
98B, for a total amount not to exceed $549,534; and
• Approve a contingency of $54,953 (10%)
Recommendation :
Construction Contract
• Award a Construction Contract to Myers & Sons
Construction, LLC for B/C-Side Primary Clarifiers
Interim Repair at Plant No. 2, Contract No. P2-9813 , for
a total amount not to exceed $8,665,000; and
• Approve a contingency of $866,500 ( 10%)
Questions ?.