Capital Improvement Program
2017- 18 Update
_ ^Y'r
Why do we do projects ?
' 'If" -A
GROUNDWATER REPLENISHMENT SYSTEM
TCJS ML
tes like water.. NE
-�
•' • 1
Increase Capacity Comply with Regulations
Improve Level of Service
dft
Ai
MARKET � i. 'a,_ �.� IL'�
or
dub
low-
-'!
Rehabilitate and
Replace Assets ` ` op \
FY 2016- 17 CIP Performance
• CIP Spending at 84%* of Projection = $ 143 M
(benchmark: 85% - 105%)
• Non-Construction Cost at 32 . 3%
(benchmark: < 37.5%)
• Cumulative Change order rate = 4. 59%
(benchmark: < 5%)
*This percentage incorrectly shown as 90% at the 5/3/2017 Operations Committee meeting.
OCSD
Annual Budget Update Process
Resources
Current Proposed
CIPInformatioAnalysisAnalysisCIP
Risks &
R Impacts to
OCSD
Asset Management Program
LA
HABRA BREA G�
'tf YORBA
FULLERTON L A
PLACEN v
BUENA 71 ._0
- •'1!l1R..l�:�•flTii� ..
PARK DtJ !
A wMMIRMAIrlin
/t"r,'
Plant No. 1 i CYPRE ANAHEIM Plant No. /fi L /
lu
A
pry
r..�y- LOS N t� �l
t - A MIT S ORANGE
GARDEN
GROVE I
f J 11. J 1 t SEAL EST
BEACH
SANTA j�7
(06 OUNTAIN j ANA TUS
VALLEY
$IC4
�_ �,(� � � _ +`
Pi
HUNTINGTON
�� ♦r 1��,• BEACH IRVINE
COSTA
P2 MESA N
NEWPORT m.wbK.. wb. `•. r— ''�✓'
. . . : K BEACH �•r6 a
Service area boundary
f Reclamation Plant No.1(PI)
� -�� �•. 7
_ _• Treatment Plant No.2(P2)
'1 �/'t0+'�•• — City Boundaries
J 1 ,_ Collections System17,
1 11 lu
:ss1 1110
Si 216:: _r, � '•
� � 3
k <'
�J
Condition Assessment
-y
►� s
Circular 24"
§' rack Longitudinal a,OCi
within 8 -
BMW
1 t - -�
11.1
,a
2:47 2.89.288 37DA "
CIP ProjectValidation
J Owner Project Number Project Title Project.:Manager 'has' Las[Upuateu Lurrent Approved Budget At Completion Total Variance at Completion
•Status:
pMl CIP Proiart Valirla
$6,734,676 $239,324
PM' _ $0
Original Project Name:
PM'
17 Manu cost Repot
($2,814,000)
Proposed Project Name: I i.;M Print Reports=>
Proposing Title Change:
PM, phase wP-ClleokBox $1,439,000
Project Manager Na— p1-to Ta1a1
PMI Data Date: Fbase1Tod 905878
PM Estimate at Completion: Phasel 4WD Project Der Resource Planning 11 226,733)
I Phase l 3010 Project Mai
PM1aze1 3020 Projett Tec ($
PM1ase 1 3031 Feasibility
Construction Forecast/Bi P 2Totel
Plar Phasel 31W Preliminar 100.0 $0
Phasel 3110 P,olect Mai PCI Group $0
Plar Phasel 31. Pr,—Tec 90.0
Design Consultant Phasel 3111 Eric—arm
Plar Forecast/Fee: Phasel _s Na.Equip to 80.0 $2,395,000
Phasel 3196 Preliminar 70.0 _ Eng Support
PM'
Phasel Z En.o-onme $6,840,000
Construction Phasel 3170 Consultam qQ 60.0
ConsultantForecast/Fee: Phasel 31N Fac;1,R.
pm, Fae3Taal 50.0 ■Electrical
vnaze 3 3zW Design 1L $0
Staff labor: Phase3 32 ProjeR Mai C 40.0 Engineer
Phase3 3220 Project Tec
pm, 0"-3 3250 COnsultam 30.0 I C Engineer ($szs,000)
Phase3 3251 Design Sur 20 0 L
other: Phase 3 3252 Design Sur W - _
PMI Phase3 3253 Design Sur 10.0 Inspection Elee- $4,329,228
Phase 3 3254 Bio suppo,
PMI Phase3 3253 E--- 0.0 I&C $239,531
Sub-Total Phase3 — Deslgn Rc, 1 ■Inspection Civil—
PMITotalContingerltyAmoul .Phase3 3270 FacilltYRe, /b CJ 'IV '1, 'J N G7 (p 1 p $53,549,405
Phase 3273 CpnstBidi ^O~ Off' I�O�' /�O�' „O�' ,ti0�' ,ti0�' ,ti0�' ,ti0�' ,ti0�' Meeh
Total: Phase3 IM Permit Acq
PM'
Phase3 322t L.ndAcqui �G, �j ($19,039,000)
Phase 3 32W Legal Cose
Project Contingency: Miisc-otal
pMl PDSAContingency: Phase4 3300 C.—&In! Resource Table.FTEs equals total hours/1664
Phase4 3310 P,,MMai q,n.Kr,_ i77011 FY)015 F77N1 FY2021 fY2H7 fY10Q3 fY2W iTApS fY)1X fY218i ($44,515,000)
PCSA Conti ngen cy: Phase4 3311 Project Tec
Construction Contingent, Phase4 3321 Pcl suppor OV51p_ 134 111 131 137 136 15) 116 7i 13' 150
PM,
Ph— 3350 consmtan. LIKIll 44 31 14 1s 10 21 21 24 26 24 ($45)
other P::4 336o cons.coot 16(tw/w /441 4T1211 5471 64 67fi
PMIContingency: e4 33Inspection Iqcfo. 1i5 111 1T1 Yll t!1 K) til L9 t11 123 $0
ase4 3363 Testing htpatu, 65 47 TQ 95 120 114 119 85 11 68
ase4 3370 F—HIR, PALM tL IS.4 121 162 205 ae 191 1s1 u4 144 133
PO NUMBER write/Edit I PrIfi 4►
Fat, "�nP�n M 6.6 41 6r 71 fl 52 41 uI L'f Its
Nt*at(& ui fit I It 41 64 11 58 71 64 $56,781
Fac a---- ---- Ar1r°Ys- t10 164 64 71 '1 Ts 73 T8 11 66
Go"dTaW 1:) 'S1 966 121 923 181 652 491 511 895 ($11,558)
10-Year CIP Budget = $ 2 . 4 Billion
Past (spent) 0 FY 17-18 Proposed Budget -*--FY16-17 Budget
$400
$350 -
$300 - /?000�
$250
o $200
$150
$100
$50
�Jti �Jti �Jti �Jti �Jti �Jti �Jti �Jti �Jti �Jti �Jti
TopBudget Increases
Project r 9W Project Name Proposed
'mob: A q
• . P1 • • -
132-119 Central Generation Rehabilitation at Plant 2 $114 M Planning
J-124 Digester Gas Facilities Rehabilitation $96.5 M Planning
P1-127 Central Generation Rehabilitation at Plant 1 $87 M Planning
5-67 Bay Bridge Pump Station Replacement $63.9 M Planning
7-65 Gisler - Red Hill Interceptor Rehabilitation $15.3 M Planning
P2-98 Primary Treatment Rehabilitation at Plant 2 $491 M Preliminary Design
P1-105 Headworks Rehabilitation and Expansion at P1 $436 M Preliminary Design
J-117 Ocean Outfall System Rehabilitation $147 M Design
2-72 Newhope-Placentia Trunk Replacement $112 M Design
J-126 Safety Improvements Program $19 M Design
TopBudget Decreases
Projecii L."L Project Name h Proposejo
MW P=1V -WEW- -
Budget
P1-126 Primary Clarifiers Replacements and $112 M Planning
Improvements at Plant 1
P1-114 Primary Scrubber Rehabilitation Project at P1 $74.8 M Planning
3-62 Seal Beach Pump Station Rehabilitation $51.1 M Preliminary Design
P2-107 SCADA System and Network Upgrades $24.1 M Design
P2-110 Consolidated Demolition and Utility $30.3 M Construction
Improvements at Plant 2
5-60 Newport Force Main Rehabilitation $59.7 M Closeout
P2-89 Solids Thickening and Processing Upgrades $48.2 M Closeout
2-65 Newhope - Placentia Trunk Grade Separation $4.3 M Closeout
Replacement
SP-129 Oxygen Plant Demolition at Plant 2 $3.0 M Closeout
TopProject Closures/Cancellations
Project
Project Name Approved
6-19 Southwest Costa Mesa Trunk Sewer $29.7 M
7-60 Browning Subtrunk Sewer Relief* $17.0 M
J-109 Cengen Cooling Water System Replacement Project $11.5 M
P1-124 Plant 1 Primary Treatment Upgrades $9.1 M
1-17 Santa Ana Trunk Sewer Rehab $7.0 M
P1-112 Plant Water System Rehabilitation at Plant 1 $6.2 M
P2-101 Plant Water System Rehabilitation at Plant 2 $3.9 M
SP-129 Oxygen Plant Demolition at Plant 2 $3.4 M
SP-173 Effluent Reuse Project $3.3 M
J-125 Programmable Control Panel Upgrades $2.3 M
SP-166 Odor Control Master Plan $2.0 M
* Project transferred to East Orange County Water District
Newly D fin Projects e ed
ProjectProject
. . . .
Budget
132-125 Plant 2 Southwest Perimeter Screening $2.8 M
P2-126 Plant 2 Warehouse Relocation $9.8 M
P2-127 Plant 2 Collections Yard Relocation $1.5 M
P2-128 TPAD Digester Facility at Plant 2 $419 M
132-129 Digester P, Q, R, and S Replacement $158 M
P1-130 Interstate 405 Widening Project Impacts on OCSD $2 7 M
Front Entrance
J-36-2 GWRS Final Expansion Coordination $1.1 M
*These projects are included in the requested CIP budget.
FY 2017 - 18 CIP BUDGET
58 ACTIVE PROJECTS = $ 148 MILLION
In Design
$42.5 Million
29% I
In Construction
$99.7 Million
67
In Planning
$5.9 Million
4%
FY 2017 - 18 CIP Highlights
• Complete the Facilities Master Plan and begin rate study
• Begin design on GWRS Final Expansion
• Continue preliminary design of 17 miles of sewer in the
western service area
• Continue design on the replacement of pump stations in
Seal Beach and Newport Beach
• Finish construction on Newhope-Placentia trunk sewer
Phase 1 ( Fullerton ) and start Phase 2 (Anaheim)
• Start testing centrifuges on the Plant 1 biosolids project
Questions ?