Capital Improvement Program
FY 2016- 17 and 2017- 1
r -
well
- J�
OCSD
Annual Budget Update Process
Resources
Current Proposed
CIPInformatioAnalysis CIP
� Risks &
Rates Impacts to
OCSD
Capacity Level of Regulatory Condition
Service Change of Assets
�1 ft
1,
Condition Assessment Program
71
g�.less (G86ft)
,r • j�';'- '� rack Longitudinal at 11 o�clock within 8 � �"'* -
+,• . � incfi: YES star 1
-+R���� 12 ...= 2.89.2006 376'12 •
Orange County
Sanitation District (OCSD) -mac
- CCTV Structural Defect LA -
HABRA BREA
Ratings 4 and Above
^AIRADA°°c = A e
p a�
FULLERTON VORBA
e LINDA
PLACENTIA
�`. .
CERRITOS
CORONA
LA t BUENA ----- „_.
PALMA° C PARK ANAHEIM n
HAWAIIAN _
GARDENS ANAHEIM IF
r a a if VILLA
PARK
CYPRESS STANTON A _
a r
LOS _ €
I ALAMITOS ORANGE /
T GARDEN
LONG s
BEACH .... GROVE 11
'�.
_ WESTMI ST R
«..•SEALP
BEACH
kk3 k SANTA a + _
ANA F - JSTIN r F LU
Y
M ,, FOUNTAIN { -$� Z 0
VALLEY "
Y
Z
HUNTINGTONy€ F �� „ r...r •�,
BEACH
y
9 �a COSTA L w IRVINE
MESA
OCSD Collections System Z
saucirua. ......
.r 4
Sewer Mains •'^*..... �+ NEWPORT _ lu
BEACH
e�ro. e
OCSD Treatment Plant N
dr
e .
Miles
0 0.5
MISS
..._ .. ,.._.._...._.e..,........,....�.....�..._ 0 1.25 2.5 5
Orange County
Sanitation District (OCSD) �c
l,.
- CCTV Inspection by Year L4 -
yd HABRA BREA
LA
:a Y
£ MI RADA
� RL
rr FULLERTON YORBA
LINDA
e CERRITOS PLACENTIA
s
CORONA
BUENA
PALMA E i PARK .
�- ANAHEIM
HAWAIIAN
GARDENS 'a ANAHEIM �?
VILLA
PARK
CYPRESS STANTON 9 W �
LOS
F ALAMITOS ORANGE
T GARDEN
a=
LONG ``^,° 4 GROVE
BEACH
40",
WESTMIN ST R -
SEAL
BEACH
•
i s 3� SANTA x Z
# ANA F ,TUSTIN 2w7
1 FjY or
R 3 E l L F Y
2
A 0 Q �
.y FOUNTAIN
VALLEY
Y
HUNTINGTONt j ° C e
BEACH .:�A n }
COSTA
MESA
OCSD Collections System
• == r
CCTV Inspection Year _ ,, • -
"'d NEWPORT _
BEACH
•^OCSD Treahnent plant I V
�
�(j Miles
..,�..^.s.�....��..^..,.....,�. .»,m.,> Miles
0 1.25 25 5
CIP Budget Forecast - FY16-17 Budget Cycle
mActuals OBudgeted Projects ORepl., Rehab & Refurb - -FY15-16 Budget
$400
$350
$300
$250
0
$200
$150
$100
$50
C5
CN N N N N N
Proposed 10-Year CIP Spending
13 . 6 % Increase
CIP + RRR
FY15-16 Adopted Budget $2, 182,300,000
FY16-17 Proposed Budget $2,408,061,000
Variance $225,761,000
TopBudget Increases
Project • _ • Name
• • • -
P2-98 Plant No.2 Primary Treatment System Rehabilitation $428,264,000
P1-105 Headworks Rehabilitation and Expansion at Plant 1 $274,841,000
3-64 Rehabilitation of Western Regional Sewers $217,069,000
P1-101 Sludge Dewatering and Odor Control at Plant 1 $188,328,000
P1-126 Primary Clarifiers Replacements and Improvements at Plant 1 $158,332,000
J-120 Process SCADA Replacement (FY19-20) $102,399,000
132-119 Central Generation Rehabilitation at Plant No. 2 (FY20-21) $95,906,000
P1-127 Central Generation Rehabilitation at Plant No. 1 (FY20-21) $73,151,000
J-117 Ocean Outfall System Rehabilitation $87,683,000
6-19 Southwest Costa Mesa Trunk Sewer $29,665,000
M-Studies Master-Studies $23,652,000
TopBudget Decreases
Project Proposed
. • :
2-72 Newhope-Placentia Trunk Replacement $99,475,000
P2-110 Consolidated Demolition and Utility Improvements at Plant 2 $38,460,000
7-37 Gisler - Red Hill Trunk Improvements - Reach B $25,213,000
P1-123 Trunk Line Odor Control Improvements $9,299,000
P1-112 Plant Water System Rehabilitation at Plant No. 1 $6,143,000
P2-101 Plant Water System Rehabilitation at Plant No. 2 $3,717,000
P2-118 Activated Sludge Aeration Basin Deck Repair at Plant No. 2 $2,3311000
SP-125 Master-Operational Research $500,000
P1-125 South Perimeter Security & Storm Water Improvements at Plant 1 $377,000
TopProject Cancellations/Closed
M Proposed
• . • Name
SP-68-1 Corrosion Management $13,153,494
132-105 Digester Ferric Chloride System Rehabilitation $4,449,000
SP-194 Administrative Facilities Implementation Planning $800,000
SP-167 Stormwater Master Plan $700,000
South Perimeter Security & Storm Water Improvements at Plant
P1-125 $582,000
No. 1
Closed Projects with Unspent Budget $49,822,694*
* Unspent budget
New Projects
PW roject Proposed Budget
�-P
7-65 Gisler - Red Hill Interceptor Rehabilitation $5,486,000
5-68 Newport Beach Pump Station Odor Control
$4,066,000
Improvements
SP-196 Process SCADA Replacement Study $3,554,000
132-120 Banning Gate Relocation and Grading at Plant 2 $2,812,000
3-64 Rehabilitation of
LA Western Regional Sewers
3-62 Seal Beach HABRA BREA
PS Rehab 1
12 • • .
l� FULLERTON v LORBq • "
PLACENTI
BUENA
L PARK
A
CYPRL ANAHEIM ILL 7-3 7 Gisler — Red Hill
LOS N _..
A Trunk Improvements
A MIT S ORANGE �
GARDEN
GROVE
c
SEAL
EST
BEACH T �c • • • •
SANTA
"
OUNTAIN ;<� ANA UST
VALLEY
/ .. HU TINGTON Pi
EACH Port Y. INE
Edinger PS Cos
Rehab Study PZ `' A
i Bay Bridge •
Slater PS . • Study o
Forcemain Rehab Study
NEWPORTmap not to scale
BEACH
Collections System
Questions ?