HomeMy WebLinkAboutPPP 10-01-14 Ops - Item 8 Water Treatment Operations Operations Committee
October 1, 2014
Orange County Sanitation District
Treatment Plant Operation
Michael Berdis
Operations Supervisor
Orange County Sanitation District
www.ocsd .com
OCSD Service Area PF --71
572 miles of sewers
471 square miles ri-�
200 million gallons per day
2.6 million population
21 cities, 3 special districts
15 O lift stations
2 Gn treatment facilities
��IIIJ �111:A
\ ��,- o F• anf�in fusliu
V]ii_y
Resource Recovery -
Plant No. 1 Irvin-
Pacific
Ocean Treatment
Plant No. 2 `��
Water Resource Recovery Facility
INCOMING water Preliminary water Primary water Secondary
Residential, Industrial rto. Treatment w10, Treatment v-40- Treatment
and Commercial
� t
i - Primary Sludge
Solids
Processing
'Ilk' Secondary GWRS
Sludge or
Ocean
Compost &
Land
i application
Water resource recovery processes or
water recycling
INCOMING PRELIMINARY PRIMARY �)' SECONDARY
R-11:erie:ri.InJu:Mimi _ Treatment Treatment Treatment
.no Commer—il
It
Ina
_ v
■ GWRS or Ocean
Orange County Sanitation I for you.
Secondary Treatment
(Aerobic Biological Treatment)
Aeration Tanks Trickling Filter
®�®r'r►♦
� - Trickling Filters
Activated Sludge �� ='���'�• •: �• ` ,o**o Fixed media with microorganisms
Free swimming microorganisms �+.� •i ••• ••• •• �i�
Orange
County Sanitation1 you.
Barscreen in operation
(Mechanical system)
f _
r■
•
Primary clarification process R ,
�r
Primary effluent (water) applied to a
trickling filter
r -
• • ' 1 1 II AL-10 IL-M I L-A IL-10 KOA M AwA
Secondary Final Clarifier
I
,
Orange County Sanitation 1 for you.
' � ..�
'�^
1
F�
��
��
I . ,
1
, ,
• ,:' P�� -
Biosolids recycling and recovery process
Primary treatment Anaerobic digester
Secondary treatment
i Trickling filter
'IM
Primary sludge Secondary sludge
Dewatering operation Aeration basins
Biosolids truck loading station
m
Land application, compost, and landfill
Orange County Sanitation District 1 1
Anaerobic digester
�3 v 04/OB/2�012 10 3K3
Orange County Sanitation District We're here for you.
Belt Filter Operation
lop
MEMO
AO S mmmw
F
oapoo a eoe �
i • • • • loading station
0
z.
Orange County Sanitation District We're here for you.
Methane gas recovery process
rti
, i
A Hydrogen Fueling station
High pres re digester Central ge ration facilit
su
gas waste flare station
Secondary Sludge
c�
Primary Sludge
Orange County Sanitation1 for you.
Central generation engines
y
4
�i
Clean Air
ODOR CONTROL Clean Air
Foul air Foul air Scrubbers
9;1
Scrubbers bleach
• caustic
• bleach
27 t • H202 t
Foul Air
CEF:oul Air
b Solids
Primary Secondary Processing
00
Headworks Treatment
Treatment
Solids Storage
Collections & Disposal
�O
Bio trickling filter scrubber
Orange County Sanitation District
We're here for you.
Wastewater Treatment Facts :
We collect and treat about 200 nri ion gallons of wastewater every day. The flow
received is about 80%municipal and 20% industrial.
Full secondary treatment was achieved in 2011
• Influent capacity PI = 280, P2 = 320- these are wet weather `�eale'events
• Outfallpumping capacity (Long outfall 480 MUD, Short outfafl 240 MUD)
Disinfection offinal effluent began in 2002
13 megawatts (NW of power generation - enough to power 20,000 houses with
23 NW of capacity at the central generation facilities.
750 average wet tons 422solids are processed every day
Orange
Levels of Service
Target 2013/14 Results
Thirty-day geometric mean of total coliform bacteria in effluent after initial J<=25
660
dilution of 250:1 m n
Meet secondary treatment standards: Jan/13 BOD-T changed to BOD-C 5.2
m /LMeet seconds treatment standards: TSS m /L 6.6
Odor com laint res onse: Treatment Plants within 1 hour 100%
100% 100%
Odor complaint response: Collections System within 1 working day
Number of odor complaints: Reclamation Plant No. 1 - New target 70" 0 11
under"normal operating conditions"
Number of odor complaints: Treatment Plant No. 2 - New target "0"under 0 25
"normal operating conditions"
Cost permillion gallon $ 1,967 $ 1,934
Budgeted expended for FY2013-14 95-100%
Orange County Sanitation I for you.
2014-15 Operating Budget 51 Million
Preliminary
Treatment
7%
Primary
Sedimentation
13%
Solids production
Secondary
and hauling, Odor, Sedimentation
and Utilities
60% 15%
Effluent
Disinfection and
- Disposal
5%
0 and M Costs per Million Gall s - 718
• . 0 Ve're here for you,
Future flows for GWRS
Current Future phase 2
GWRS flows expansion Future ex ansion with GWRS
Future influent flow at Future flows for plant 133 M G D
97 MGD plant one by end of 133 MGD one
Current influent year
flow at P-1
Current GWRS 96 MGD Phase 2 GWRS expansion 133 MGD Future expansion of 2OO MGD
flow GWRS
103 MGD P-2 influent flow 67 MGD P-2 influent flow 67 MGD
Current flow at P-2
Current outfall 128 MGD Outfall flow 92 MGD Outfall flow 25 MGD
discharge
MOWN
Orange County Sanitation I for you.
•
Orange County Sanitation District We're here for you.