HomeMy WebLinkAbout95.Item 13 PPP Board 03-22-2017_FE16-08 Authorize GM to Award ConstructionCarbon Canyon Clay Pipe Repairs
Project No. FE16-08
Authorization for General Manager to Award Construction Contract
March 22, 2017
Carbon Canyon Repairs
•Clay pipe installed in 2009
•Some segments have a severe material defect
Sancon $
Repairs and Concerns
•Cured-in-place structural lining designed in-house
•Two bids received March 16th
•Sancon Engineering, Inc. $303,563
•Insituform Technologies $431,646
•2-foot hole found on March 13th.
•More failures may occur before lining starts
•$150,000 contingency to
cover repairs that might be
needed.
Recommended Action
•Authorize the General Manager to receive and review bids, and award a construction contract to the lowest responsive, responsible bidder for an amount not to exceed $432,000 for the Carbon Canyon Clay Pipe Repairs, Project No. FE16-08.
•Authorize a construction contingency of $150,000 for the Carbon Canyon Clay Pipe Repairs, Project No. FE16-08