HomeMy WebLinkAbout04-06-2022 Operations Committee Meeting Complete Agenda Packet
ORANGE COUNTY SANITATION DISTRICT
SPECIAL NOTICE REGARDING CORONAVIRUS (COVID-19) AND ATTENDANCE AT PUBLIC MEETINGS
Governor Newsom signed Assembly Bill (AB) 361 on September 16, 2021, which, in part, addresses the conduct of public meetings in light of the continued State of Emergency order.
Effective October 1, 2021, AB 361 suspends the requirements located in California Government Code, Section 54953, Subdivision (b), Paragraph (3) specifically pertaining to the conduct of public meetings. As such, the Orange County Sanitation District (OC San) Board of Directors has determined that due to the size of OC San’s Board of Directors (25), and the health and safety of the members, the Board of Directors will be participating
in meetings of the Board telephonically and via Internet accessibility. PUBLIC PARTICIPATION
Your participation is always welcome. OC San offers several ways in which to interact during meetings. You will find information as to these opportunities below. ONLINE MEETING PARTICIPATION
You may join the meeting live via Teams on your computer or similar device or web browser by using the link below: Click here to join the meeting
We suggest testing joining a Teams meeting on your device prior to the commencement of the meeting. For recommendations, general guidance on using Teams, and instructions on joining a Teams meeting, please click here.
Please mute yourself upon entry to the meeting. Please raise your hand if you wish to speak during the public comment section of the meeting. The Clerk of the Board will call upon you by using the name you joined with. Meeting attendees are not provided the ability to make a presentation during the meeting.
Please contact the Clerk of the Board at least 48 hours prior to the meeting if you wish to present any items. Additionally, camera feeds may be controlled by the meeting moderator to avoid inappropriate content.
OC ~SAN
ORANGE COUNTY SANITATION DISTRICT
HOW TO PARTICIPATE IN THE MEETING BY TELEPHONE To join the meeting from your phone: Dial (213) 279-1455 When prompted, enter the Phone Conference ID: 885 880 744#
All meeting participants may be muted during the meeting to alleviate background noise. If you are muted, please use *6 to unmute. You may also mute yourself on your device. Please raise your hand to speak by use *5, during the public comment section of the meeting. The Clerk of the Board will call upon you by using the last 4 digits of your phone
number as identification. NOTE: All attendees will be disconnected from the meeting at the beginning of Closed Session. If you would like to return to the Open Session portion of the meeting, please login or dial-in to the Teams meeting again and wait in the Lobby for admittance. VIEW THE MEETING ONLINE ONLY The meeting will be available for online viewing only at:
https://ocsd.legistar.com/Calendar.aspx HOW TO SUBMIT A COMMENT
You may provide verbal comment in real time during the meeting. In order to provide a verbal comment, please raise your hand as described above or alert the Clerk of the Board before or during the public comment period. You may also submit your comments and questions in writing for consideration in advance
of the meeting by using the eComment feature available online at: https://ocsd.legistar.com/Calendar.aspx or sending them to OCSanClerk@ocsan.gov with the subject line “PUBLIC COMMENT ITEM # (insert the item number relevant to your comment)” or “PUBLIC COMMENT NON-AGENDA ITEM”.
You may also submit comments and questions for consideration during the meeting by using the eComment feature available online at: https://ocsd.legistar.com/Calendar.aspx. The eComment feature will be available for the duration of the meeting. All written public comments will be provided to the legislative body and may be read into
the record or compiled as part of the record. TECHNICAL SUPPORT PRIOR TO AND DURING MEETINGS
For technical assistance before and during the meeting, please call 714-593-7431. For
any other questions and/or concerns, please contact the Clerk of the Board’s office at 714-593-7433. Thank you, in advance, for your patience in working with these technologies. We appreciate your interest in OC San!
March 30, 2022
NOTICE OF REGULAR MEETING
OPERATIONS COMMITTEE
ORANGE COUNTY SANITATION DISTRICT
Wednesday, April 6, 2022 – 5:00 P.M.
ACCESSIBILITY FOR THE GENERAL PUBLIC
Your participation is always welcome. Specific information as to how to
participate in this meeting is detailed in the Special Notice attached to
this agenda. In general, OC San offers several ways in which to interact
during meetings: you may join the meeting live via Teams on your
computer or similar device or web browser, join the meeting live via
telephone, view the meeting online, and/or submit comments for
consideration before or during the meeting.
The Regular Meeting of the Operations Committee of the Orange County
Sanitation District will be held at the above location and in the manner
indicated on Wednesday, April 6, 2022 at 5:00 p.m.
0 ~SAN 10844 Ellis Avenue
Fountain Valley, CA 92708
714.962.2411
ORANGE COUNTY SANITATION DISTRICT www.ocsan.gov
Our Mission: To protect public health and the environment by
providing effective wastewater collection, treatment, and recycling.
Serving:
Anaheim
Brea
Buena Park
Cypress
Fountain Valley
Fullerton
Garden Grove
Huntington Beach
Irvine
La Habra
La Palma
Los Alamitos
Newport Beach
Orange
Placentia
Santa Ana
Seal Beach
Stanton
Tustin
Villa Park
County of Orange
Costa Mesa
Sanitary District
Midway City
Sanitary District
Irvine Ranch
Water District
Yorba Linda
Water District
OPERATIONS COMMITTEE MEETING DATE
BOARD MEETING DATE
04/06/22 04/27/22
05/04/22 05/25/22
06/01/22 06/22/22
07/06/22 07/27/22
AUGUST DARK 08/24/22
09/07/22 09/28/22
10/05/22 10/26/22
11/02/22 11/16/22 *
12/07/22 12/21/22 *
JANUARY DARK 01/25/23
02/01/23 02/22/23
03/01/23 03/22/23
* Meeting will be held on the third Wednesday of the month
ROLL CALL OPERATIONS COMMITTEE
Engineering and Operations & Maintenance
Meeting Date: April 6, 2022 Time: 5:00 p.m. Adjourn:
COMMITTEE MEMBERS (14)
Brooke Jones (Chair)
Ryan Gallagher (Vice-Chair) Stephen Faessel
Johnathan Ryan Hernandez
Steve Jones Sandra Massa-Lavitt
Paulo Morales
Kim Nichols
Bob Ooten
Jesus J. Silva
Donald P. Wagner
Chad Zimmerman
John Withers (Board Chair)
Chad Wanke (Board Vice-Chair)
OTHERS
Brad Hogin, General Counsel
STAFF
Jim Herberg, General Manager
Rob Thompson, Assistant General Manager
Lorenzo Tyner, Assistant General Manager
Celia Chandler, Director of Human Resources
Kathy Millea, Director of Engineering
Riaz Moinuddin, Director of Operations & Maintenance
Lan Wiborg, Director of Environmental Services
Kelly Lore, Clerk of the Board
ORANGE COUNTY SANITATION DISTRICT Effective 03/07/2022 BOARD OF DIRECTORS Complete Roster AGENCY/CITIES
ACTIVE DIRECTOR
ALTERNATE DIRECTOR
Anaheim
Stephen Faessel
Gloria Ma’ae Brea Glenn Parker Cecilia Hupp Buena Park Art Brown Connor Traut Cypress Paulo Morales Anne Hertz-Mallari Fountain Valley Patrick Harper Ted Bui Fullerton Jesus J. Silva Nick Dunlap Garden Grove Steve Jones John O’Neill Huntington Beach Kim Carr Dan Kalmick Irvine Anthony Kuo Farrah N. Khan
La Habra Rose Espinoza Steve Simonian La Palma Marshall Goodman Nitesh Patel Los Alamitos Ron Bates NONE Newport Beach Brad Avery Joy Brenner Orange Kim Nichols Chip Monaco Placentia Chad Wanke Ward Smith Santa Ana Johnathan Ryan Hernandez Nelida Mendoza Seal Beach Sandra Massa-Lavitt Schelly Sustarsic Stanton David Shawver Carol Warren Tustin Ryan Gallagher Austin Lumbard Villa Park Chad Zimmerman Robert Collacott Sanitary/Water Districts
Costa Mesa Sanitary District
Bob Ooten
Art Perry Midway City Sanitary District Andrew Nguyen Mark Nguyen Irvine Ranch Water District John Withers
Douglas Reinhart
Yorba Linda Water District Brooke Jones Ted Lindsey County Areas
Board of Supervisors Donald P. Wagner
Doug Chaffee
OPERATIONS COMMITTEE
Regular Meeting Agenda
Wednesday, April 6, 2022 - 5:00 PM
Board Room
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
ACCOMMODATIONS FOR THE DISABLED: If you require any special disability related accommodations,
please contact the Orange County Sanitation District (OC San) Clerk of the Board’s office at (714) 593-7433 at
least 72 hours prior to the scheduled meeting. Requests must specify the nature of the disability and the type
of accommodation requested.
AGENDA POSTING: In accordance with the requirements of California Government Code Section 54954.2, this
agenda has been posted outside the main gate of the OC San's Administration Building located at 10844 Ellis
Avenue, Fountain Valley, California, and on the OC San’s website at www.ocsan.gov not less than 72 hours
prior to the meeting date and time above. All public records relating to each agenda item, including any public
records distributed less than 72 hours prior to the meeting to all, or a majority of the Board of Directors, are
available for public inspection in the office of the Clerk of the Board.
AGENDA DESCRIPTION: The agenda provides a brief general description of each item of business to be
considered or discussed. The recommended action does not indicate what action will be taken. The Board of
Directors may take any action which is deemed appropriate.
MEETING AUDIO: An audio recording of this meeting is available within 24 hours after adjournment of the
meeting at https://ocsd.legistar.com/Calendar.aspx or by contacting the Clerk of the Board at (714) 593-7433.
NOTICE TO DIRECTORS: To place items on the agenda for a Committee or Board Meeting, the item must be
submitted in writing to the Clerk of the Board: Kelly A. Lore, MMC, (714) 593-7433 / klore@ocsan.gov at least 14
days before the meeting.
FOR ANY QUESTIONS ON THE AGENDA, BOARD MEMBERS MAY CONTACT STAFF AT:
General Manager: Jim Herberg, jherberg@ocsan.gov / (714) 593-7300
Asst. General Manager: Lorenzo Tyner, ltyner@ocsan.gov / (714) 593-7550
Asst. General Manager: Rob Thompson, rthompson@ocsan.gov / (714) 593-7310
Director of Human Resources: Celia Chandler, cchandler@ocsan.gov / (714) 593-7202
Director of Engineering: Kathy Millea, kmillea@ocsan.gov / (714) 593-7365
Director of Environmental Services: Lan Wiborg, lwiborg@ocsan.gov / (714) 593-7450
Director of Operations & Maintenance: Riaz Moinuddin, rmoinuddin@ocsan.gov / (714) 593-7269
OC ~SAN
ORANGE COUNTY SANITATION DISTRICT
OPERATIONS COMMITTEE Regular Meeting Agenda Wednesday, April 6, 2022
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL AND DECLARATION OF QUORUM:
Clerk of the Board
PUBLIC COMMENTS:
Your participation is always welcome. Specific information as to how to participate in a meeting is detailed in the
Special Notice attached to this agenda. In general, OC San offers several ways in which to interact during
meetings: you may join the meeting live via Teams on your computer or similar device or web browser, join the
meeting live via telephone, view the meeting online, and/or submit comments for consideration before or during
the meeting.
You may provide verbal comment in real time during the meeting. In order to provide a verbal comment, please
raise your hand (directions provided in the Special Notice attached to this agenda) or alert the Clerk of the Board
before or during the public comment period.
You may submit your comments and questions in writing for consideration in advance of the meeting by using the
eComment feature available online at: https://ocsd.legistar.com/Calendar.aspx or sending them to
OCSanClerk@ocsan.gov with the subject line “PUBLIC COMMENT ITEM # (insert the item number relevant to
your comment)” or “PUBLIC COMMENT NON-AGENDA ITEM”.
You may also submit comments and questions for consideration during the meeting by using the eComment
feature available online at: https://ocsd.legistar.com/Calendar.aspx. The eComment feature will be available for
the duration of the meeting.
All written public comments will be provided to the legislative body and may be read into the record or compiled as
part of the record.
REPORTS:
The Committee Chairperson and the General Manager may present verbal reports on miscellaneous matters of
general interest to the Directors. These reports are for information only and require no action by the Directors.
CONSENT CALENDAR:
Consent Calendar Items are considered to be routine and will be enacted, by the Committee, after one motion,
without discussion. Any items withdrawn from the Consent Calendar for separate discussion will be considered in
the regular order of business.
1.2022-2231APPROVAL OF MINUTES
RECOMMENDATION:
Approve Minutes of the Special Meeting of the Operations Committee held March 16,
2022.
Originator:Kelly Lore
Page 1 of 5
OPERATIONS COMMITTEE Regular Meeting Agenda Wednesday, April 6, 2022
Agenda Report
03-16-2022 Operations Committee Minutes - Special Meeting
Attachments:
2.2021-1727INTERSTATE 405 WIDENING PROJECT IMPACTS ON OCSD
SEWERS, PROJECT NO. 3-66
RECOMMENDATION: Recommend to the Board of Directors to:
A. Approve the First Amendment to Utility Agreement No. UK204650, between the
Orange County Sanitation District and the Orange County Transportation
Authority for Interstate 405 Widening Project Impacts on OCSD Sewers, Project
No. 3-66; and
B. Approve the First Amendment to Utility Agreement No. UK201113, between the
Orange County Sanitation District and the Orange County Transportation
Authority for Interstate 405 Widening Project Impacts on OCSD Sewers, Project
No. 3-66.
Originator:Kathy Millea
Agenda Report
3-66 UK201113-2 OCSAN 1113 - First Amendment to
Agreement
3-66 UK204650-2 OCSAN 1114 - First Amendment to
Agreement
Utility Agreement UK201113
Utility Agreement UK204650
Attachments:
3.2022-2199SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1, PROJECT
NO. FE20-07
RECOMMENDATION: Recommend to the Board of Directors to:
A. Receive and file Bid Tabulation and Recommendation for Santa Ana Trunk
Rehabilitation at Plant No. 1, Project No. FE20-07;
B. Award a Construction Contract to Sancon Technologies, Inc. for Santa Ana
Trunk Rehabilitation at Plant No. 1, Project No. FE20-07, for an amount not to
exceed $395,082; and
C. Approve a contingency of $79,016 (20%).
Originator:Kathy Millea
Agenda Report
FE20-07 Contract Agreement
Attachments:
Page 2 of 5
OPERATIONS COMMITTEE Regular Meeting Agenda Wednesday, April 6, 2022
NON-CONSENT:
4.2021-1972PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT
PLANT NO. 1, PROJECT NO. P1-126
RECOMMENDATION: Recommend to the Board of Directors to:
A. Approve a Professional Design Services Agreement with Black & Veatch to
provide engineering services for Primary Sedimentation Basins No. 3-5
Replacement at Plant No. 1, Project No. P1-126, for an amount not to exceed
$14,163,000; and
B. Approve a contingency of $1,416,300 (10%).
Originator:Kathy Millea
Agenda Report
P1-126 PDSA
Presentation - P1-126 PDSA
Attachments:
5.2021-1970SANTA ANA TRUNK SEWER REHABILITATION, PROJECT NO. 1-23
RECOMMENDATION: Recommend to the Board of Directors to:
A. Approve a Professional Design Services Agreement with Stantec Consulting
Services, Inc. to provide engineering services for Santa Ana Trunk Sewer
Rehabilitation, Project No. 1-23, for an amount not to exceed $3,880,000; and
B. Approve a contingency of $388,000 (10%).
Originator:Kathy Millea
Agenda Report
1-23 PDSA
Presentation - 1-23 PDSA
Attachments:
6.2022-2070SUPPLEMENTAL ENGINEERING SERVICES, CONTRACT NO.
PSA2021-002
RECOMMENDATION: Recommend to the Board of Directors to:
Approve Professional Services Agreements to provide Supplemental Engineering
Services, Contract No. PSA2021-002, for a three-year period commencing May 1,
2022, through April 30, 2025, with two one-year renewal options, for an amount not to
exceed $29,700,000 per individual agreement with the following two firms:
·AECOM Technical Services, Inc.
·Jacobs Project Management Co.
Originator:Kathy Millea
Page 3 of 5
OPERATIONS COMMITTEE Regular Meeting Agenda Wednesday, April 6, 2022
Agenda Report
PSA2021-002-1 PSA AECOM
PSA2021-002-2 PSA Jacobs
Presentation - PSA2021-002 SES Award
Attachments:
7.2022-2116PROFESSIONAL PROGRAMMING SERVICES, CONTRACT NO.
PSA2021-001
RECOMMENDATION: Recommend to the Board of Directors to:
Approve Professional Services Agreements to provide Professional Programming
Services, Contract No. PSA2021-001, for a three-year period commencing May 1,
2022, through April 30, 2025, with two one-year renewal options, for an amount not to
exceed $4,900,000 per individual agreement with the following two firms:
·Enterprise Automation
·Maverick Technologies
Originator:Kathy Millea
Agenda Report
Draft PSA2021-001 PSA
Presentation - PSA2021-001 PSA Award
Attachments:
INFORMATION ITEMS:
8.2022-2188OPERATIONS & MAINTENANCE: WASTEWATER 101 PART 1:
COLLECTIONS
RECOMMENDATION:
Information Item.
Originator:Riaz Moinuddin
Agenda Report
Presentation - Collection System
Attachments:
9.2022-2180TPAD DIGESTER FACILITY AT PLANT NO. 2, PROJECT NO. P2-128
RECOMMENDATION:
Information Item.
Originator:Kathy Millea
Agenda Report
Presentation - P2-128 Info Item
Attachments:
Page 4 of 5
OPERATIONS COMMITTEE Regular Meeting Agenda Wednesday, April 6, 2022
DEPARTMENT HEAD REPORTS:
CLOSED SESSION:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
At this time Directors may request staff to place an item on a future agenda.
ADJOURNMENT:
Adjourn the Committee meeting until the Regular Meeting of the Operations Committee on
May 4, 2022 at 5:00 p.m.
Page 5 of 5
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2022-2231 Agenda Date:4/6/2022 Agenda Item No:1.
FROM:James D. Herberg, General Manager
Originator: Kelly A. Lore, Clerk of the Board
SUBJECT:
APPROVAL OF MINUTES
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Approve Minutes of the Special Meeting of the Operations Committee held March 16, 2022.
BACKGROUND
In accordance with the Board of Directors Rules of Procedure, an accurate record of each meeting
will be provided to the Directors for subsequent approval at the following meeting.
RELEVANT STANDARDS
·Resolution No. OC SAN 21-04
ATTACHMENT
The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda
package:
·Minutes of the Operations Committee meeting held March 16, 2022
Orange County Sanitation District Printed on 3/29/2022Page 1 of 1
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
Orange County Sanitation District
Minutes for the
OPERATIONS COMMITTEE
Wednesday, March 16, 2022
4:00 PM
Board Room
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
SPECIAL MEETING
CALL TO ORDER
A special meeting of the Operations Committee of the Orange County Sanitation District was
called to order by Committee Chair Brooke Jones on Wednesday, March 16, 2022 at 4:01
p.m. in the Administration Building of the Orange County Sanitation District. Chair Jones
stated that the meeting was being held telephonically and via Internet accessibility in
accordance with new provisions in California Government Code Section 54953 and
Resolution No. OC SAN 22-08, due to the continued State of Emergency Order. Chair Jones
announced the teleconference meeting guidelines and led the flag salute.
ROLL CALL AND DECLARATION OF QUORUM:
Roll call was taken and a quorum was declared present, as follows:
PRESENT:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner, Chad Wanke and John
Withers
ABSENT:Kim Nichols and Chad Zimmerman
STAFF PRESENT: Kelly Lore, Clerk of the Board, and Brian Engeln were present in the
Board Room. Jim Herberg, General Manager; Rob Thompson, Assistant General Manager;
Lorenzo Tyner, Assistant General Manager; Celia Chandler, Director of Human Resources;
Kathy Millea, Director of Engineering; Riaz Moinuddin, Director of Operations and
Maintenance; Lan Wiborg, Director of Environmental Services; Marc Brown; Jennifer Cabral;
Mortimer Caparas; Tanya Chong; Tina Knapp; Rich Leon; Laura Maravilla; Joshua Martinez;
Rob Michaels; Jeff Mohr; Wally Ritchie; Thomas Vu; and Eros Yong were in attendance
telephonically.
OTHERS PRESENT: Brad Hogin, General Counsel; Anni Larkins, Jacobs; and James Clark,
Black & Veatch, were in attendance telephonically.
PUBLIC COMMENTS:
OC San Supervisory and Professional Management Group (SPMG) President Marc Brown
spoke in opposition to the continued use of supplemental engineering services referenced in
Item No. 10.
Page 1 of 7
OC ~SAN
ORANGE COUNTY SANITATION DISTRICT
OPERATIONS COMMITTEE Minutes March 16, 2022
REPORTS:
Chair Jones reported that he recently participated in a CASA Workshop entitled: "Biosolids
101 for Agency Managers, Directors, and Staff" and highly recommended it for the Board
Members. He stated the recording was available at casaweb.org.
General Manager Jim Herberg did not provide a report
CONSENT CALENDAR:
1.APPROVAL OF MINUTES 2022-2150
Originator: Kelly Lore
MOVED, SECONDED, AND DULY CARRIED TO:
Approve Minutes of the Regular Meeting of the Operations Committee held February 2,
2022.
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and John Withers
NOES:None
ABSENT:Kim Nichols, Chad Wanke and Chad Zimmerman
ABSTENTIONS:None
2.WASTE SIDESTREAM PUMP STATION VFD REPLACEMENTS AT
PLANT NO. 1, PROJECT NO. FR1-0016
2021-1945
Originator: Kathy Millea
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Receive and file Bid Tabulation and Recommendation for Waste Sidestream
Pump Station VFD Replacements at Plant No. 1, Project No. FR1-0016;
B. Award a Construction Contract to Leed Electric, Inc. for Waste Sidestream
Pump Station VFD Replacements at Plant No. 1, Project No. FR1-0016, for an
amount not to exceed $344,889; and
C. Approve a contingency of $51,733 (15%).
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and John Withers
NOES:None
ABSENT:Kim Nichols, Chad Wanke and Chad Zimmerman
Page 2 of 7
OPERATIONS COMMITTEE Minutes March 16, 2022
ABSTENTIONS:None
3.DIGESTERS REHABILITATION AT PLANT NO. 2, PROJECT NO.
P2-137
2021-1969
Originator: Kathy Millea
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Approve a Professional Design Services Agreement with CDM Smith, Inc. to
provide engineering services for Digesters Rehabilitation at Plant No. 2, Project
No. P2-137, for an amount not to exceed $2,700,000; and
B. Approve a contingency of $270,000 (10%).
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and John Withers
NOES:None
ABSENT:Kim Nichols, Chad Wanke and Chad Zimmerman
ABSTENTIONS:None
4.SURVEYING SERVICES, PSA2022-002 2022-2105
Originator: Kathy Millea
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
Approve Professional Services Agreements to provide on-call surveying services for
collection system and treatment plant projects, PSA2022-002, for a three-year period
effective May 1, 2022, for an amount not to exceed $200,000 per individual agreement
($800,000 total) with the following four firms:
·Michael Baker International, Inc.
·Stantec Consulting Services, Inc.
·Psomas
·D. Woolley & Associates, Inc.
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and John Withers
NOES:None
ABSENT:Kim Nichols, Chad Wanke and Chad Zimmerman
ABSTENTIONS:None
Page 3 of 7
OPERATIONS COMMITTEE Minutes March 16, 2022
5.COATING INSPECTION AND CORROSION TESTING SERVICES, PSA
2022-001
2022-2106
Originator: Kathy Millea
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
Approve Professional Services Agreements to provide on-call Coating Inspection and
other Corrosion Testing Services for Collection System and Treatment Plant projects,
PSA2022-001, for a three-year period effective May 1, 2022, for an amount not to
exceed $300,000 per individual agreement ($600,000 total) with the following two firms:
·CSI Services, Inc.
·Diversified Project Services International (DPSI)
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and John Withers
NOES:None
ABSENT:Kim Nichols, Chad Wanke and Chad Zimmerman
ABSTENTIONS:None
7.POWER HEADS REPAIRS FOR CENTRAL GENERATION ENGINES
AT PLANT NOS. 1 AND 2
2022-2143
Originator: Riaz Moinuddin
MOVED, SECONDED, AND DULY CARRIED TO:
A. Approve additional funds of $60,300.60 to Sole Source Purchase Order
146032-OS, for Cooper Machinery Services to repair 16 spare Engine Power
Heads for Engines at Central Generation for Plant Nos. 1 and 2, for a new total
amount not to exceed $132,915 plus taxes and shipping; and
B. Approve a contingency of $13,292 (10%).
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and John Withers
NOES:None
ABSENT:Kim Nichols, Chad Wanke and Chad Zimmerman
ABSTENTIONS:None
Page 4 of 7
OPERATIONS COMMITTEE Minutes March 16, 2022
8.REIMBURSEMENT AGREEMENT FOR ORANGE COUNTY
SANITATION DISTRICT MANHOLE FRAME AND COVER
ADJUSTMENTS ON EUCLID STREET IN THE CITY OF ANAHEIM
2022-2152
Originator: Kathy Millea
MOVED, SECONDED, AND DULY CARRIED TO:
Approve and authorize the General Manager to execute a Reimbursement Agreement
with the City of Anaheim for an amount not to exceed $180,000 for Orange County
Sanitation District manhole frame and cover adjustments on Euclid Street in the City of
Anaheim in a form approved by General Counsel.
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and John Withers
NOES:None
ABSENT:Kim Nichols, Chad Wanke and Chad Zimmerman
ABSTENTIONS:None
Item No. 6 was pulled and heard separately.
6.MATERIALS TESTING, INSPECTION, AND OTHER GEOTECHNICAL
TESTING SERVICES, PSA2022-003
2022-2119
Originator: Kathy Millea
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
Approve a Professional Services Agreement to provide on-call Materials Testing,
Inspection, and Other Geotechnical Testing Services for Collection System and
Treatment Plant Projects, PSA2022-003, for a three-year period effective May 1, 2022,
for an amount not to exceed $400,000 per individual agreement ($1,600,000 total) with
the following four firms:
·Atlas Technical Consultants LLC
·Aesco Technologies
·MTGL, Inc.
·Koury Engineering and Testing, Inc.
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and John Withers
NOES:None
ABSENT:Kim Nichols, Chad Wanke and Chad Zimmerman
ABSTENTIONS:None
Page 5 of 7
OPERATIONS COMMITTEE Minutes March 16, 2022
Board Vice-Chair Wanke arrived at the meeting at approximately 4:15 p.m.
Board Chair Withers appeared to be away during the vote on Item No. 9.
NON-CONSENT:
9.SECONDARY TREATMENT VFD REPLACEMENTS AT PLANT NO. 2,
PROJECT NO. FE19-08
2021-1785
Originator: Kathy Millea
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Receive and file Bid Tabulation and Recommendation for Secondary Treatment
VFD Replacements at Plant No. 2, Project No. FE19-08;
B. Receive and file Orange County Sanitation District’s Notice of Intent to Award
dated January 27, 2022;
C. Receive and file Award Protest from LEED Electric, Inc. dated February 2, 2022,
concerning the award to ACS Engineering;
D. Receive and file Orange County Sanitation District’s determination letter dated
February 10, 2022 to LEED Electric, Inc. responding to award protest;
E. Award a Construction Contract to ACS Engineering for Secondary Treatment
VFD Replacements at Plant No. 2, Project No. FE19-08, for an amount not to
exceed $1,433,000; and
F. Approve a contingency of $143,300 (10%).
AYES:Brooke Jones, Ryan Gallagher, Stephen Faessel, Johnathan Ryan
Hernandez, Steve Jones, Sandra Massa-Lavitt, Paulo Morales,
Robert Ooten, Jesus Silva, Donald Wagner and Chad Wanke
NOES:None
ABSENT:Kim Nichols, John Withers and Chad Zimmerman
ABSTENTIONS:None
INFORMATION ITEMS:
10.STAFFING STRATEGY TO DELIVER CAPITAL IMPROVEMENT
PROGRAM
2022-2158
Originator: Kathy Millea
Engineering Manager Jeff Mohr provided a PowerPoint presentation regarding the
Capital Improvement Program Delivery Strategy which included the forecasted CIP
expenditures; capital project delivery costs; forecasted staff, engineering, and
programming workload; supplemental services contracts; and next steps to be taken.
Page 6 of 7
OPERATIONS COMMITTEE Minutes March 16, 2022
ITEM RECEIVED AS AN:
Information Item.
DEPARTMENT HEAD REPORTS:
None.
CLOSED SESSION:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
Chair Jones declared the Special meeting adjourned at 4:36 p.m. to the next Regular
Operations Committee meeting to be held on Wednesday, April 6, 2022 at 5:00 p.m.
Submitted by:
__________________
Kelly A. Lore, MMC
Clerk of the Board
Page 7 of 7
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2021-1727 Agenda Date:4/6/2022 Agenda Item No:2.
FROM:James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
INTERSTATE 405 WIDENING PROJECT IMPACTS ON OCSD SEWERS, PROJECT NO. 3-66
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Recommend to the Board of Directors to:
A. Approve the First Amendment to Utility Agreement No. UK204650, between the Orange
County Sanitation District and the Orange County Transportation Authority for Interstate 405
Widening Project Impacts on OCSD Sewers, Project No. 3-66; and
B. Approve the First Amendment to Utility Agreement No. UK201113, between the Orange County
Sanitation District and the Orange County Transportation Authority for Interstate 405 Widening
Project Impacts on OCSD Sewers, Project No. 3-66.
BACKGROUND
The Orange County Transportation Authority (OCTA) is widening Interstate 405 (I-405) between State
Route 73 and Interstate 605. This work has the potential to impact the Orange County Sanitation
District’s (OC San) sewers. In June 2017, OCTA and OC San approved Utility Agreements that
arranged for OC San’s review of OCTA’s plans to verify facilities would be adequately protected,
allowed OC San to inspect the relevant work, and set the basis for OCTA to compensate OC San for
their costs. At OCTA’s request, eight separate Utility Agreements were created to cover different
segments of the I-405 widening.
OC San’s costs for this project are charged to Interstate 405 Widening Project Impacts on OCSD
Sewers, Project No. 3-66, for later billing to OCTA.
RELEVANT STANDARDS
·Protect OC San assets
·Maintain collaborative and cooperative relationships with regulators, stakeholders, and
neighboring communities
Orange County Sanitation District Printed on 3/29/2022Page 1 of 3
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
File #:2021-1727 Agenda Date:4/6/2022 Agenda Item No:2.
PROBLEM
In May 2021,OCTA’s contractor damaged OC San sewers at two separate locations.At one of the
locations,an upstream diversion prevented a spill.At the other location,OC San had to divert
around the damaged section using pumper trucks for three days until the damage was repaired.
Responding to the damage,reviewing repair plans,and inspecting the repairs has required more
staff time than anticipated for one of the eight utility agreements.Also,OCTA needs these costs
itemized for them to obtain compensation from their contractor.The total costs incurred by OC San
for these two breaks is approximately $63,000.
PROPOSED SOLUTION
Approve amendments to two Utility Agreements that segregate the costs of addressing the damages
from the rest of the costs associated with these agreements.This segregation allows OCTA to
recover the costs from their contractor.
One of the two amendments also increases the maximum compensation from $94,682 to $148,805
to account for these costs. The other Utility Agreement has sufficient budget to address the costs.
TIMING CONCERNS
OC San staff is actively inspecting the on-going work by OCTA’s contractor widening the freeway.
RAMIFICATIONS OF NOT TAKING ACTION
OC San would be unable to invoice OCTA for the full amount and OCTA would not have segregated
costs to seek compensation for their contractor.
PRIOR COMMITTEE/BOARD ACTIONS
June 2017 -Approved eight Utility Agreements in conjunction with the Cooperative Agreement
approved with the Orange County Transportation Authority agreeing to define specific terms,
conditions,and funding obligations regarding the relocation,reconstruction,and protection of the
regional sewers located along Interstate 405 Freeway to accommodate the Interstate 405
Improvement Project.
ADDITIONAL INFORMATION
N/A
CEQA
N/A
Orange County Sanitation District Printed on 3/29/2022Page 2 of 3
powered by Legistar™
File #:2021-1727 Agenda Date:4/6/2022 Agenda Item No:2.
FINANCIAL CONSIDERATIONS
This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been
budgeted (Budget Update,Fiscal Year 2021-2022,Appendix A,Page A-7,Interstate 405 Widening
Project Impacts on OCSD Sewers,Project No.3-66).Although the costs associated with the two
breaks will require a project budget increase which staff intends to include in the proposed Budget for
Fiscal Years 2022-23 and 2023-24,these additional costs will be covered by compensation from
OCTA.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·First Amendment to Utility Agreement UK201113-2 OCSAN 1113
·First Amendment to Utility Agreement UK204650-2 OCSAN 1114
·Original Agreements
RL:jw
Orange County Sanitation District Printed on 3/29/2022Page 3 of 3
powered by Legistar™
ORANGE COUNTY TRANSPORTATION AUTHORITY
FIRST AMENDMENT TO UTILITY AGREEMENT NO. UK201113
(UK201113-2)
DISTRICT
12
COUNTY
Orange
FEDERAL AID NUMBER
HPLULN-6071(043)
FEDERAL PARTICIPATION
ROUTE
l-405
POST MILE
9.3-24.2
OWNER'S PLAN NUMBER
NIA
EA
12-0Hl00
PROJECT ID
1200000180
On the project t8J YES O NO On the Utilities O YES t8] NO
FIRST AMENDMENT TO UTILITY AGREEMENT NO. UK201113
(UK201113-2) DATE
WHEREAS, Orange County Transportation Authority ("Authority") and Orange County Sanitation District
("Sanitation District") have entered into that certain Utility Agreement No. UK201113, dated June 28, 2017
("Agreement"), which Agreement sets forth the terms and conditions pursuant to which the Sanitation
District has performed plan review to accommodate certain aspects of the Authority's construction on
Interstate 405, Project No. 1200000180; and,
WHEREAS, it was originally contemplated by the Authority and the Sanitation District that the Facilities (as
defined in paragraph 1 below) would need to be modified by way of relocation or extended encasement; and,
WHEREAS, the Authority and the Sanitation District have since jointly concluded that relocation or extended
encasement of the Facilities would not be necessary, and a revised plan was developed to protect the Facilities
m place; an ,
WHEREAS, in the performance of the Authority's construction to accommodate the Project, the Authority's
contractor damaged the Facilities and must perform a repair procedure to restore the Facilities to a condition
that is acceptable to the Sanitation District; and,
WHEREAS, in the performance of the Authority's contractor's repair procedure, the repair failed and a
second repair procedure was performed; and,
WHEREAS, the Authority and the Sanitation District require an amendment to the Agreement to include
proper funding and other specific scope of work for this repair to the Facilities; and
WHEREAS, this additional work requires additional Sanitation District funds to perform additional
coordination, design reviews, and to perform Closed Circuit Television (CCTV) and field inspections, as well
as other related activities to repair the damage to the Facilities.
NOW, THEREFORE, it is agreed between the Authority and the Sanitation District as follows:
1. On page 1, paragraph 3 of the Agreement is amended to read as follows:
"The Sanitation District owns, operates, and maintains a regional sewerage system, including the
1204732.1
58285972.v2
FIRST AMENDMENT TO UTILITY AGREEMENT UK201113
(UK201113-2)
Page 2 of3
sewerage facilities described in Exhibit A (the "Facilities"). The Facilities are within the limits of the
Project. In order to accommodate the Project, the Facilities must be properly protected in place within
the Project limits ("Protection"). Additionally, the Facilities must be repaired due to damage caused
by the Authority's contractor ("Damage Repair" or, collectively with the "Protection," the
"Modification"). The Modification plan must be approved by the Sanitation District prior to
construction, and any Modification construction must be inspected by the Sanitation District. During
construction of the Modification, temporary diversion of flow within the Facilities may be necessary
to provide for the safe operation of the Sanitation District's sewerage system."
2. On page 3, section 3.b. is amended to read as follows:
"b. Diversions. Upon the Authority's request, the Sanitation District's engineers shall analyze
potential sewer diversion impacts using the Sanitation District's hydraulic model. Upon the
Sanitation District's approval of this diversion analysis, the Authority shall develop a detailed
diversion plan to address the Sanitation District's system constraints for final approval. Any
temporary diversion design shall require the Sanitation District's approval prior to implementation.
Temporary Diversions shall be implemented, monitored, and removed by the Authority in
accordance with the requirements of the plan approved by the Sanitation District."
-----~3_._0~n~Rage 6, a new section 4.i shall be added, to read_a~foHows.: __________________ _
"i. Cost Segregation. All Sanitation District costs related to the Damage Repair, including design plan
review, coordination, CCTV, diversion analysis and inspections shall be tracked and itemized
separately from other previously anticipated protection inspection items by the Sanitation District and
shall be submitted to the Authority in a manner which will allow the Authority to identify those costs
associated with the Damage Repair separately from the costs associated with the Projection for
purposes of the Authority's billing the Damage Repair costs to its contractor."
4. All other terms and conditions of the Agreement shall remain unchanged.
58285972.v2
FIRST AME. D:\IE~T TO LTILITY AGREE:\IENT UK20I I 13
(U K201 I 13-2)
SIG1 ATURE PAGE
TO
FIRST AMENDMENT TO UTILITY AGREEME1 T NO.
UK20I I 13 (UK20I I I3-2)
IN WIT NESS WHEREOF. the parties hereto have cxc<.:utcd this First Amendment to Utility Agrccrncn l No.
UK20 I 113 this __ day or _____ _
OWNER:
Orange County Sanitation District
By:
ORANGE COUNTY
TRANS PORTA TIO'.'/ AUTHORITY,
a public entity
APPROVED
[3y:
Tith:: Jamc_I=-=.=c~----------------------;:E:--x · tivc Director.
Dale: --------------
By:
Title:
Date: --------------
C )ital Pro!.!.rams
D,nc 1/ o 1[n-,_
APPROVED AS TO FORM:
13y:
Date:
Ri ck Rayl . ,
SpL:cial Counsel
--------------
ORANGE COUNTY TRANSPORTATION AUTHORITY
FIRST AMENDMENT TO UTILITY AGREEMENT NO. UK204650
(UK204650-2)
DISTRICT
12
COUNTY
Orange
FEDERAL AID NUMBER
HPLULN-6071(043)
FEDERAL PARTICIPATION
ROUTE
I-405
POST MILE
9.3 -24.2
OWNER'S PLAN NUMBER
NIA
EA
12-0Hl00
PROJECT ID
1200000180
On the project [8:1 YES O NO On the Utilities O YES [8:1 NO
FIRST AMENDMENT TO UTILITY AGREEMENT NO. UK204650
(UK204650-2) DATE
WHEREAS, Orange County Transportation Authority ("Authority") and Orange County Sanitation District
("Sanitation District") have entered into that certain Utility Agreement No. UK.204650, dated June 28, 2017
("Agreement"), which Agreement sets forth the terms and conditions pursuant to which the Sanitation
District has performed inspection and plan review to accommodate certain aspects of the Authority's
construction on Interstate 405, Project No. 1200000180; and,
WHEREAS, in accordance with Section l .f of the Agreement, the Authority shall be responsible for all
damages arising out of its Project and shall perform all necessary repairs; and,
WHEREAS, in the performance of the Authority's construction to accommodate the Project, the Authority's
contractor damaged a Facility between Harbor Boulevard and Fairview Avenue and will perform a repair
procedure to restore the Facility to a condition that is acceptable to the Sanitation District; and,
WHEREAS, Sanitation District agrees to perform a portion of the repair of the Facility related to sewer liner
installation through a separate contractor; and,
WHEREAS, the Authority and the Sanitation District require an amendment to the Agreement to include
proper funding and other specific scope of work for this repair to the Facility; and
WHEREAS, this additional work requires additional Sanitation District funds to perform additional
coordination, design reviews, and to perform Closed Circuit Television (CCTV) and field inspections, as well
as other related construction activities to repair the damage to the Facility; and,
WHEREAS, it has been determined that, since estimated final costs will exceed the amount included in
original Agreement, an amendment is required to address the increased cost of the work performed by the
Sanitation District; and,
WHEREAS, the estimated cost to Authority of the work to be performed under said Agreement was $94,682,
and by reason of the increased costs referred to above, the amended estimated cost to OCTA increased to
$148,805.
NOW, THEREFORE, it is agreed between the Authority and the Sanitation District as follows:
1. The third paragraph on page 1 of the Agreement is amended to read as follows:
1204732.1
60234677. v2
FIRST AMENDMENT TO UTILITY AGREEMENT UK204650
(UK204650-2)
Page 2 of3
The Sanitation District owns, operates, and maintains a regional sewerage system, including the
sewerage facilities described in Exhibit A ( each a "Facility" and any two or more the "Facilities"). The
Facilities are within the limits of the Project. In order to accommodate construction of the Project,
protection of ce11ain Facilities (which the Authority believes will not suffer any direct impact from
the Project or its construction) requires cooperation between the Authority and the Sanitation District
and, in some cases, may require additional mitigation measures not anticipated by the Authority to
ensure that the Facilities are protected in place ("Protection Measures"). Any Protection Measures
related to the Facilities as a result of the Project must be reviewed and approved by the Sanitation
District prior to construction. Any construction over, w1der, or directly proximate to the Facilities must
be inspected by the Sanitation District to ensure safe operation of the Facilities and the Sanitation
District's sewerage systems. Additionally, for any Facilities that must be repaired due to damage
caused by the Authority's contractor ("Damage Repair"), the Damage Repair plan must be approved
by the Sanitation District prior to construction, and any Damage Repair construction must be inspected
by the Sanitation District. During construction of the Damage Repair, temporary diversion of flow
within the Facilities may be necessary to provide for the safe operation of the Sanitation District's
sewerage system."
2. On page 3, section 2.c. is amended to read as follows:
"The Sanitation District estimates that the cost of the Sanitation District's work under this Agreement,
including sewer pipe liner related to the repair of the Facility, will be $148,805 ("Estimated
Sanitation District Costs")."
3. On page 6, a new section 4.i shall be added, to read as follows:
"i. Cost Segregation. All Sanitation District costs related to the Damage Repair, including design plan
review, coordination, CCTV, diversion analysis and inspections shall be tracked and itemized
separately from other previously anticipated protection inspection items by the Sanitation District and
shall be submitted to the Authority in a manner which will allow the Authority to identify those costs
associated with the Damage Repair separately from the costs associated with the Projection for
purposes of the Authority's billing the Damage Repair costs to its contractor."
4. All other terms and conditions of the Agreement shall remain unchanged.
60234677. v2
FIRST A\IES0:\1l::~T TO UTILITY ACREEME~T UK20-l650
(U 1(204650-2)
SIGNATURF. PAGE
TO
FIRST AMENDME, 'I' TO UT ILITY AGREEMENT 1 0.
UK204650 (UK204650-2)
IN WITNESS WHEREOF. th~ panics hereto have executed this First Amendment to Util ity Agn.:cmcnt No.
UK204650 this __ day of _______ _
ow 1[R:
Orange County Sanitation District
By:
Title:
Date: --------------
By:
Ti tk:
Date: --------------
ORA~CE COU:'-/TV
TRA~SPORTATION AUTHORITY,
a public entity
APPROV ED
By:
. Beil
c tivc Director.
Date: · ha);;+z_'l.-~----
APPROVED AS TO FORM:
By:
/ / \ 0
' • I .J/4 . , ~ It,,• -✓, . ,. . (,
Rick Ray l , (
Special Coun sel
Date: --------------
Page I of9
ORANGE COUNTY TRANSPORTATION AUTHORITY
UTILITY AGREEMENT
District COUNTY ROUTE POST MILE EA PROJECT ID
12 Orange 1-405 9.3-24.2 12-OHl000 1200000180
FEDERAL AID NUMBER OWNER'S PLAN NUMBER
NIA NIA
FEDERAL PARTICIPA TlON
On the project [gj YES O NO On the Utilities O YES (8J NO
UTILITY AGREEMENT NO. UK201113 DATE
This Utility Agreement ("Agreement") is dated ~ 8", 2017 and is between the
Orange County Transportation Authority ("Autho ty") and the Orange County Sanitation
District ("Sanitation District"), which are sometimes referred to individually in this Agreement
as a "party" or together as the "parties."
The Authority in cooperation with the California Department of Transportation ("Caltrans") is
proposing to improve Interstate 405 between State Route 73 and Interstate 605 (the "Project").
The Authority and Caltrans have entered into Cooperative Agreement No. 12-697 relating to the
Project under which Caltrans will provide Project oversight, the Authority will perform
construction, and upon completion of the Project, Cal trans wi II continue to own and maintain the
Interstate 405.
The Sanitation District owns, operates, and maintains a regional sewerage system, including the
sewerage facilities described in Exhibit A (the "Facilities"). The Facilities are within the limits
of the Project. In order to accommodate the Project, the Facilities must be modified by way of
relocation or extended encasement (each a "Modification"). Any Modification plan must be
approved by the Sanitation District prior to construction, and any Modification construction must
be inspected by the Sanitation District. During construction of a Modification, temporary
div ersion of flow within the Facilities may be necessary to provide for the safe operation of the
Sanitation District's sewerage system.
The Authority and the Sanitation District intend by this Agreement to provide for the conditions
under which the Authority may modify the Sanitation District's Facilities, and the Authority's
payment to the Sanitation District of the Sanitation District's costs related to the Modification.
Authority and Sanitation District therefore agree as follows:
1. MODIFICATION WORK.
a. Facility Modification. In accordance with the Relocation Claim Letter attached as
Exhibit A dated July 30, 2015, the Authority may modify the Sanitation District's
Facilities as generally shown on the Authority's preliminary engineering plans for
the improvement of Interstate 405, EA 12-OH I 000, subject to the written
approval by the Sanitation District's General Manager (or his designee)
4811 -8693-2554.1 49190819.v2
UTILITY AGREEMENT (Cont.) Page 2 of9
UTILITY AGREEMENT NO.
UK201113
("General Manager") of the final engineering plans and specifications (the
"Plans").
b. Sanitation District's Approval of Plans. The Sanitation District's General
Manager shall review the Plans, and will have sole discretion to and approve the
Plans. It is anticipated by both parties that multiple reviews may be required for
design approval. The Sanitation District shall make commercially reasonable
efforts to review and provide any comments back to Authority within 30 days.
The Sanitation District agrees not to unreasonably withhold its approval of
Authority's design. Additionally, the Sanitation District agrees to provide a
written notice requesting a review period extension in the event its review will
extend beyond 30 calendar days.
c. Deviation from Plans. Any deviations from the Plans must be proposed by the
Authority under a Revised Notice to Owner. The Authority shall not commence
any Modification work that deviates from the Plans prior to the Sanitation
District's approval of the Revised Notice to Owner, which approval is subject to
the Sanitation District's General Manager's sole discretion. The Sanitation
District will use commercially reasonable efforts to review and approve revisions
to the Plans within four weeks after their delivery to the Sanitation District and
written acknowledgment of receipt. If additional time is required, Sanitation
District shall provide Authority with a written notice identifying the additional
time requested.
d. Notification of Construction; Access. Authority shall advise the Sanitation
District of the anticipated dates of construction of the Modification at least 30
days prior to the date of construction. The Sanitation District shall at all times
have access to its Facilities, and the Authority and its contractor shall not restrict
or obstruct the Sanitation District's access to the Facilities at any time.
e. Ownership and Maintenance. Upon completion of the Modification work by the
Authority, and the Sanitation District's final inspection and approval of the
Modification, the Sanitation District shall accept ownership and maintenance of
the modified Facilities.
f. Property Rights Acquisition. Nothing in this Agreement is intended to waive or
limit the Sanitation District's right to just compensation for all Project-related
uses of the Sanitation District's real or personal property. The Authority shall
acquire any necessary property rights from the Sanitation District in accordance
with state and federal law prior to undertaking construction of the Modification.
48JJ-8693-2554.149190819.v2
UTILITY AGREEMENT (Cont.) Page 3 of9
2.
UTILITY AGREEMENT NO.
UK201113
SANITATION DISTRICT'S COSTS.
a. The Facilities are lawfully maintained in their present location and qualify for
relocation or other Modification at Caltrans's expense under the provisions of
Section 703 of the Streets and Highways Code.
b. The Authority assumes all costs associated with the Modification, including
Sanitation District's costs of plan review, inspection, and flow diversion. The
Sanitation District does not benefit from the Project and therefore will have no
liability for any costs arising out of or relating to any Modification of the Facilities
under or in connection with this Agreement.
c. The Sanitation District estimates that the cost of the Sanitation District's work
under this Agreement will be $44,271.38 ("Estimated Sanitation District Costs").
3. SANITATION DISTRICT'S INSPECTIONS AND DIVERSIONS.
a. Sanitation District Inspection. The Sanitation District may inspect (and the
Authority shall provide the Sanitation District with access to) any phase of the
Modification work for the purpose of the Sanitation District's inspection to ensure
that the work is in accordance with the specifications contained in the Plans and
any related construction contract. The Sanitation District shall direct all questions
regarding the Modification work to Authority's Resident Engineer for his or her
evaluation and recommended disposition.
b. Diversions. Upon the Authority's request, the Sanitation District's engineers shall
analyze potential sewer diversion impacts using the Sanitation District's hydraulic
model. Upon request and the Sanitation District's approval following the
diversion analysis described in the prior sentence, the Sanitation District's field
crew staff shall implement and monitor the temporary diversion, and then remove
the diversion.
c. Public Work. Inspections and field work described above in this Section 3 and
performed by Sanitation District employees fall within the exception of Labor
Code Section l 720(a)( l) and do not constitute a public work under Section
l 720(a)(2) and are not subject to prevailing wages.
4. AUTHORITY'S PAYMENT FOR SANITATION DISTRICT COSTS.
a. The Authority shall construct the Modifications at no cost to the Sanitation
District and shall pay Sanitation District for its Actual Costs (as defined in this
section) of
4811-8693-2554. l 491908 I 9. v2
UTILITY AGREEMENT (Cont.) Page 4 of9
UTILITY AGREEMENT NO.
UK201113
(l) Administration of this Agreement (including planning, coordination, and
communication with the Authority) and review and approval of the Plans
(and any revisions to the Plans);
(2) Inspection of the Modification construction; and
(3) Analyzing, planning and implementing any sewer diversions necessitated
by the Modification.
b. "Actual Costs" means the total fully-burdened salaries, wages, and equipment
costs including overhead and administration.
c. It is understood and agreed that Authority will not pay for any betterment or
increase in capacity of Sanitation District's facilities as part of this Agreement,
and that any request by Sanitation District for changes in the Plans that involve
any such betterment or increase in capacity shall, if Authority accepts such
proposed changes, be paid for solely by Sanitation District.
d. The Sanitation District shall not use any out-of-state personnel (or personnel
requiring lodging and meal "per diem" expenses) for its plan review, inspection,
or diversion work under this Agreement.
e. All costs incurred by the Sanitation District as a result of the Authority's request
of July 30, 2015 to review, study and/or prepare relocation plans and estimates for
the Project may be billed pursuant to the terms and conditions of this Agreement.
f. Billing Procedure.
( 1) Progress Bills. Not more frequently than once a month, but at least
quarterly, Sanitation District will prepare and submit progress bills
itemized for costs incurred not to exceed Sanitation District's recorded
costs. The Sanitation District's itemized progress bill must be signed by
an authorized official and prepared on the Sanitation District's letterhead,
compiled on the basis of Actual Costs incurred and charged or allocated
to the Modification in accordance with the policies of the Sanitation
District that conform to the accounting principles generally accepted in the
United States of America (GAAP) as applicable to governments.
(2) Progress Payments. The Authority shall pay the Sanitation District within
45 days after receipt of the Sanitation District's progress bills. Payment
of progress bills not to exceed 125% of the Estimated Sanitation District
Costs may be made under the terms of this Agreement. The Authority
shall pay progress bills that exceed 125% of the Estimated Sanitation
District Costs only upon receipt and approval by Authority of
4811-8693-2554. l 49190819. v2
UTILITY AGREEMENT (Cont.) Page 5 of9
UTILITY AGREEMENT NO.
UK201113
documentation supporting the cost increase and after an amendment to this
Agreement has been executed by the parties to this Agreement.
(3) Sanitation District shall submit a final bill to Authority within 365 days
after the completion of the Sanitation District's acceptance of the
Modification described in Section 1. If Authority has not received a final
bill within 365 days after notification of completion of the Modification,
and Authority has delivered to Sanitation District fully executed Director's
Deeds, Consents to Common Use or Joint Use Agreements for Sanitation
District's facilities (if required), then Authority shall provide written
notification to Sanitation District of its intent to close its file within 30
days. All remaining costs will be deemed to have been abandoned if not
submitted to Authority for payment prior to such closure of the file. If
Authority processes a final bill for payment first received from Sanitation
District after closure of the file, payment of the late bill may be subject to
allocation and/or approval by the Authority's Board of Directors.
( 4) The final billing must be in the form of an itemized statement of the total
costs charged to the Project, less the credits provided for in this
Agreement, and less any amounts covered by progress billings. However,
Authority shall not pay final bills which exceed the estimated cost of this
Agreement without documentation of the reason for the increase of said
cost from the Sanitation District and approval of that documentation by
Authority. However, if the final bill exceeds the Sanitation District's
estimated costs solely as the result of a revised Notice to Owner, then a
copy of that revised Notice to Owner will suffice as documentation. In
either case, payment of the amount over the Estimated Sanitation
District's Cost may be subject to allocation and/or approval by the
Authority Board of Directors.
g. If the Pa11ies anticipate that the Sanitation District's costs will exceed 125% of the
Estimated Sanitation District Costs, then the parties shall negotiate in good faith
an amendment to this Agreement prior to the payment of the Sanitation District's
final bill. Any and all increases in costs that are the direct result of deviations
from the work described in Section l of this Agreement shall have the prior
concurrence of Authority and Sanitation District.
h. Sanitation District shall retain detailed billing records for a period of three years
from the date of the final payment, and will make the records available for audit
by Authority, State and/or Federal auditors. The Sanitation District currently
complies with State law applicable to sanitation districts and generally accepted
accounting principles, which are generally consistent with existing Federal
regulations. Upon notice from the Authority, the Sanitation District shall comply
4811-8693-2554. I 49190819. v2
UTILITY AGREEMENT (Cont.) Page 6 of9
UTILITY AGREEMENT NO.
UK201113
with any additional Federal regulations identified by the Authority as applicable
to the Sanitation District's actions in connection with the Project under this
agreement.
5. TERMINATION.
If Authority's Project is canceled or modified so as to eliminate the need for the
Modification, then the Authority will notify the Sanitation District in writing and
any party may terminate this Agreement at any time prior to the commencement
of construction of the Modification by providing 30 days written notice to the
other party. The Authority shall pay the Sanitation District for all costs incurred
up to the date of termination. The billing procedures in Section 5 shall survive the
termination of this Agreement.
6. INSURANCE.
The Authority shall incorporate within the contract documents for the Project a
requirement for the contractor to obtain and keep in full force and effect
throughout the life of the Project insurance naming the Sanitation District as an
additional insured and in compliance with all insurance requirements in Exhibit B.
7. INDEMNITY.
a. The Authority shall be responsible for all costs, expenses, losses, fines, penalties,
civil administrative liabilities, and liabilities relating to the construction of any
Modification, and shall indemnify, defend, and hold harmless the Sanitation
District, its directors, officers, agents, and employees, from all claims, demands,
actions, costs (including attorneys fees), liabilities, losses, damages, including
claims for personal injury (including death) or property damages, penalties, fines,
administrative civil liabilities, and/or remediation costs arising from or in any way
associated with the following:
(I) Construction of any Modification, including but not limited to trenching,
backfill work above the pipe zone, and pavement work;
(2) Any overflows or spills of wastewater arising out of or relating to the
construction of any Modification; and
(3) Any claims for sewer capacity by any former discharger to the Facilities
that are impacted by any Modification.
b. This indemnity provision will survive the termination of this Agreement.
4811-8693-2554.I 49190819.v2
UTILITY AGREEMENT (Cont.) Page 7 of9
UTILITY AGREEMENT NO.
UK201113
8. GENERAL PROVISIONS.
a. This Agreement contains the entire agreement between the parties concerning the
Modification, except with respect to compensation for the Authority's use of any
of the Sanitation District's property rights. Any amendment to this Agreement
must be in a writing executed by both parties.
b. Each party has participated in negotiating and drafting this Agreement, so if an
ambiguity or a question of intent or interpretation arises, this Agreement is to be
construed as if the parties had drafted it jointly.
c. A waiver of any breach of any provision of this Agreement or of any failure to
comply with any requirement of this Agreement will not be deemed a waiver of
any other provision or requirement of this Agreement, and no waiver will be valid
unless in writing and executed by the waiving party. An extension of time for
perfo1mance of any obligation or act will not be deemed an extension of time for
performance of any other obligation or act.
d. Authority represents and warrants that no federal or California state funds will be
used to pay Sanitation District under this Agreement. Sanitation District
represents and warrants that it will not use federal or California state funds in
order to perform any of its obligations under this Agreement. The Parties agree
that they shall not seek or obtain payment or reimbursement from Caltrans for any
work, cost, expense, fee, obligation or liability that arises under this Agreement.
e. This Agreement will be executed in duplicate originals, one of which will be
retained by each party.
f. This Agreement will inure to the benefit of and will be binding upon the parties
and their respective successors and assigns.
g. This Agreement will be governed and construed in accordance with California
law.
h. Each pa1ty shall execute and deliver any instruments, and to perform any actions
that may be necessary, or reasonably requested, in order to give full effect to this
Agreement.
1. The Sanitation District hereby delegates to its General Manager the authority to
approve any deviations from the Plans, in his sole and absolute discretion, as
contemplated in section l .c.
4811-8693-2554.l 49190819.v2
UTILITY AGREEMENT (Cont.) Page 8 of9
UTILITY AGREEMENT NO.
UK201113
J. All notices or other communication must be in writing and be personally served
or delivered by United States mail, or nationally-recognized overnight carrier
addressed as follows, with a courtesy copy by email:
Sanitation District:
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708
Mr. Rob Thompson
Director of Engineering
Email: RThompson@ocsd.com
Tel: 714-593-7310
Authority:
Orange County Transportation Authority
550 South Main Street
P.O. Box 14184
Orange, CA 92863-1584
Attn: Mr. Dennis Mak
Principal Contract Administrator
Email: DMak@octa.net
Tel: 714-560-5446
Any party may, by notice to the others, designate a different address for notices
which will be substituted for that specified above. Any notice given as provided
in this section will be deemed to have been received, if personally served, as of
the date and time of service, or if deposited in the mail as provided above, forty-
eight ( 48) hours after deposit in the mail.
Signatures on Following Page
4811-8693-2554.1 49190819. v2
UTILITY AGREEMENT (Cont.) Page 9 of 9
UTILITY AGREEMENT NO.
UK201113
SIGNATURE PAGE
TO
UTILITY AGREEMENT NO.
UK20 111 3
IN WITN ESS WHEREOF, the parties have executed this Agreement on the dates below.
ORANGE COUNTY SANITATION
DISTRICT
APPROVED
By: ~<P ' ·-7
-reg }'.Sebotlrn,PLS
Board Chair
Date:
APPROVED AS TO FORM:
Lewis Brisbois Bisgaard & Smith, LLP
By:
Special Counsel
481 1-8693-2554. I 49 I 908 I 9. v2
ORANGE COUNTY
TRANSPORTATION AUTHORITY,
a public entity
APPROVED
By:
{vf!_'. Jim
Executive Director,
Capital Programs
Date: l, / '2-,?_.,,,/ / 1 I 1
APPROVED AS TO FORM:
By:
Rick Rayl '
Speciale=
49190819.v2
Exhibit A
Relocation Claim Letter
m
OCTA
BOARD OF DIRECTORS
Jeffrey Lalloway
Chairman
Lori Donc/Jak
ViceCt,air
Lisa A. Bari/ell
Director
A11drewDo
Director
Michael l-le1111essey
Director
Steve Jones
Director
Jim l<atapodis
Director
Ga,y A. Miller
Director
Al M(lrray
Director
$haw11 Netso11
Director
Miguel Pulido
Director
Tim Shaw
Director
Todd Spitzer
Director
M1cl1elle Steel
Directo,
Tom la1t
Director
Frank Ury
Director
Grego,y T. Wi11Jer/Jol/o,n
Director
Ryan Cl1am/Jerlai11
Ex-O1//cio Member
Cl-llff EXECUrtVE OFFICE
Darrell Johnson
Chief Executive Officer
July 30, 2015
OCSD
I 0844 Ellis Avenue
Fountain Valley, CA 92708
Attention:
Subject:
Mr. Rudy Davila
Project Manager
I-405 Improvement Project (EA-OHlO00)
Relocation Claim Letter/Utility Conflicts
Utility ID No. OCSD1113
Dear Mr. Davila:
The Orange County Transportation Authority (OCTA) in cooperation with Caltrans, proposes
to improve the Interstate 405 (I-405) from 1-605 to SR-73. The environmentally selected
alternative includes reconfiguration of interchanges, intersections widening the freeway for
general purpose lanes and re-striping various locations along the corridor. It is anticipated that
the environmental approval will take place this summer while OCTA continues the process of
advancing preliminary engineering for utilities.
Enclosed is one preliminary map covering OCSD conflict areas of the proposed 1-405
Project.
Your Company's facilities are within the proposed project area and may be affected by planned
construction. These plans are for your use in:
( 1) Verifying your existing facilities as shown on the plans
(2) Completing yom Conceptual Preliminary Relocation Plans
(3) Identifying related easement requirements
( 4) Developing your claim of liability
This is a freeway and all rights of access will be restricted. If the OCT A is liable for any
portion of your relocation costs, and if a consulting engineer will prepare any of your plans, a
copy of the proposed agreement with your consultant must be furnished to this office as soon
as possible. Employment of a consultant for a fee based on a percentage of the relocation cost
is not acceptable. If desired, an example of a typical consultant agreement, along with the
Certification of Consultant, will be furnished upon your request.
It is the intent of the project to replace property rights "in kind" to existing terms. If easements
are required to relocate your facilities, please delineate your needs on the plans. This
information is necessary as soon as possible so your replacement easements can be planned
for by the OCT A along with other lands required for this project. You may submit your
easement requirements ahead of your overall conceptual preliminary relocation plans.
Please submit the following information for review so a Preliminary Draft Utility Agreement
can be prepared:
Orange County Transportation Authority
550 South Main Street I P.O. Box 14184 I Orange I California 92863-1584 I (714) 560-OCTA (6282)
Page 2
I. Two sets of your conceptual preliminary relocation plans with related easement
requirements, if any, and any changes to the existing facilities as shown on the
State's preliminary plans.
2. The date your existing facilities were installed.
3. Your occupancy rights for installation:
A. Fee-owned land
B. Easement (recorded)
C. Easement (unrecorded)
D. Prescriptive right
E. Joint Use Agreement (JUA) or Consent to Common Use Agreement (CCUA)
F. Franchise
G. State Permit
H. County Permit
I. City Permit
J. Joint Pole Agreement
K. Other ( explain)
Please provide a copy of your documentation to support your occupancy rights claim for A,
B, C, D, or E above,
4. An itemized estimate of cost for the preparation of your conceptual preliminary
relocation design so a Design based utility agreement can be prepared.
5. Your work will be performed by:
A. Own forces
B. Continuing contractor
C. Competitive bid contract
6. Your liability claim:
OCTA _____ % OCSD _____ %
The Project is currently scheduled for construction start in the summer of 2017.
Please submit your information to me by no later than September 4, 2015. If you have any
questions or require additional information, please feel free to contact me at (714) 560-5406
Your Cooperation is greatly appreciated
Sincer~-
/ ~
M. Joseph Toolson
OCT A Project Manager
Enclosures: 1) Conflict Map
.!:..
(0 ) ...
:_; .. .
'· ' . ~! :
i . i g w ,.
• t 5 . ' I f ~
~ ~ (
~~ 3~~
..t!:~ ~E:: v15-v g~~~ ••::,• ~~,,i
<I Vl w :::E
"' f-Vl 0 u
Lo. 0
u
. .,,
~ ~ ~ 0 " 'l
~ . ,
w
..
I • ••_r
l .
Yi
[, ..
l .,,
' '\
;
1 . '
<fl "'<fl 0 0 ... ...
w w f-., a ::, 0 a: a:
a:, m V, z
fj " t
.. I
I I
., "' I
!~
J.
I
I ~
"'"'
. ·\.
l'> HVSOC.
L S ,-----+
>
1-c,t
-LO :::! I
I-::::,
::>
0 0
II '
w J <( u Vl
N0llVHI0dSNl81 JO INJU8Yd30 YINOOJllll :IO ll Y l S
49190819.v2
Exhibit B
Insurance Provisions
EXHIBIT B
Insurance Requirements
1. The Authority shall be the lead agency under the California Environment Quality
Act of 1970, California Public Resources Code § 21000 et seq. (CEQA), as amended, for the
Project.
2. The Authority shall award a construction contract for the Project to a contractor
appropriately registered and licensed to practice in the State of California, including with respect
to performance and implementation of the work ("Contractor").
3. The Authority shall be responsible for the award and administration and
performance of the contract, including supervising the implementation of the Project and the
Contractor's performance in accordance with the requirements, provisions and restrictions of the
contract. The Authority shall diligently proceed with the contract award and Project
commencement promptly following the execution of this Agreement.
4. The Authority shall incorporate within the contract documents for the Project a
requirement for the Contractor to obtain and keep in full force and effect throughout the life of
the Project, for the mutual benefit of the Sanitation District and the Authority, a policy or
policies of comprehensive, broad form, commercial general liability insurance written on ISO
from CG 00 01, or a substitute form providing liability coverage at least as broad in the amount
of $3,000,000 limit per occurrence with a $3,000,000 aggregate and automobile insurance
against claims and liabilities for activities of the Contractor in the amount of$ l ,000,000
(combined single limit per occurrence).
(A) The policy or policies will name the Sanitation District and their
respective elected and appointed officials, officers, agents and employees as additional insureds
using ISO form CG 2010 or CG 2033, or a form at least as broad and shall, additionally, contain
language providing for waiver of subrogation. The policy or policies will include a primary and
non-contributory endorsement using ISO form CG 20 01 04 13, or a form at least as broad,
evidencing that the policies are primary and noncontributing with any insurance or self-insurance
that may be carried by the Sanitation District or other third parties, and that said insurance may
not be canceled or materially changed except upon thirty (30) days written notice to the
Authority and the Sanitation District. The policy or policies shall include a Products and
Completed Operations endorsement using ISO form GC 2027 (ed. 10/01) or a form at least as
broad.
(B) The Authority shall also require that workers' compensation benefits are
secured by the Contractor as required by law, and provide an endorsement waiving all rights of
subrogation against the Parties to this Agreement with regard to any workers' compensation
claims, including any such claims against the Sanitation District.
(C) Prior to the issuance of the Notice to Proceed to the Contractor, the
Authority shall provide the Sanitation District with policies and endorsements naming the
4818-0017-7991.1
Sanitation District as an additional insured for the general liability and automobile liability
policies described above.
(D) In addition, the Authority shall require its Contractor to obtain pollution
liability insurance written on a claims-made or occurrence basis, that covers losses related to the
release or the threatened release of pollutants into the environment arising out of or resulting
from the Contractor's performance of the Project. The minimum limits of Pollution Liability
shall be $2 million per occurrence/$2 million policy aggregate. When this coverage is provided
under endorsement to the general liability policy, the $2 million per occurrence must be a
sub-limit. The pollution liability policy shall also contain an Additional Insured endorsement
and a primary and non-contributory endorsement naming the Parties to this Agreement.
(E) If the Contractor maintains higher limits than any minimums above, the
Sanitation District will be entitled to coverage for the higher limits maintained by the Contractor.
5. The Authority shall require that any and all labor and materials bonds and
performance bonds required to be supplied by the Contractor for the Project shall include the
Sanitation District as a named obligee, and Authority shall not release any bonds unless and until
the Authority has determined, and the Sanitation District has concurred in writing, that the
Modification has been successfully completed without damage or impact to Sanitation District
facilities or operations.
4818-0017-7991.l
ORANGE COUNTY TRANSPORTATION AUTHORITY
UTILITY AGREEMENT
District COUNTY ROUTE POST MILE
12 Orange 1-405 9.3-24.2
EA
12-OHIO00
FEDERAL AID NUMBER OWNER'S PLAN NUMBER
NIA NIA
FEDERAL PARTlCIPA TION
On the project [gj YES O NO On the Utilities O YES [gj NO
UTILITY AGREEMENT NO. UK204650 DATE
Page I of9
PROJ ECT JD
1200000180
This Utility Agreement ("Agreement") is dated -1~--'--""""-"""--'-~-• 2017 and is between the
Orange County Transportation Authority ("Auth ity") and the Orange County Sanitation
District ("Sanitation District"), which are sometimes referred to individually in this Agreement
as a "party" or together as the "parties."
The Authority in cooperation with the California Depa11ment of Transportation ("Cal trans") is
proposing to improve Interstate 405 between State Route 73 and Interstate 605 ("Project"). The
Authority and Caltrans have entered into Cooperative Agreement No. 12-697 relating to the
Project under which Caltrans will provide Project oversight, the Authority will perform
construction, and upon completion of the Proj ect, Caltrans will continue to own and maintain the
Interstate 405.
The Sanitation District owns, operates, and mainta ins a regional sewerage system, including the
sewerage facilities described in Exhibit A (each a "Facility" and any two or more are the
"Facilities"). The Facilities are within the limits of the Project. In order to accommodate
construction of the Project, protection of certain Facilities (which the Authority believes will not
suffer any direct impact from the Project or its construction) requires cooperation between the
Authority and the Sanitation District and, in some cases, may require additional mi tigation
measures not anticipated by the Authority to ensure that the Facilities are protected in place
("Protection Measures"). Any Protection Measures related to the Facilities as a result of the
Project must be reviewed and approved by the Sanitation District prior to construction. Any
construction over, under, or directly proximate to the Faci lities must be inspected by the
Sanitation District to ensure safe operation of the Sanitation District's sewerage systems.
The Authority and the Sanitation District intend by this Agreement to provide for the conditions
under which the Authority may build over, under, or within the zone of influence of th e Facilities
as reasonably determined by the Sanitation District and provides the approach by which the
parties will cooperate to determine appropriate Protection Measures to protect the Facilities. This
Agreement is also intended to facilitate the Authority's payment to the Sanitation District of the
Sanitation District's costs related to the review, oversight, and inspection of the Project design as
it relates to the Facilities, along with any plans fo r protection of the Facilities.
The Authority and the Sanitation District therefore agree as follows:
1. PROTECTION WORK.
4849-3414-9962. I
56067585. v8
UTILITY AGREEMENT (Cont.) Page 2 of9
UTILITY AGREEMENT NO.
UK20465O
a. Facility Protection. In accordance with the Relocation Claim Letters attached as
Exhibit A, dated March 10, 2015 and May 30, 2017, the Authority shall take such
steps as are reasonably necessary to protect the Facilities for the improvement of
Interstate 405, EA 12~OH 1000, subject to the written approval by the Sanitation
District's General Manager (or his designee) ("General Manager") of the final
engineering plans and specifications (the "Plans").
b. Sanitation District's Approval of Plans. The Sanitation District's General
Manager shall review the proposed Plans related to the Sanitation District's
Facilities. The Sanitation District shall make commercially reasonable efforts to
review and provide any comments back to Authority within 30 days. The
Sanitation District agrees not to unreasonably withhold its approval of the
Authority's design of required Protection Plans. Additionally, the Sanitation
District agrees to provide a written notice requesting a review period extension in
the event its review will extend beyond 30 calendar days. It is intended by the
parties that for the purposes of this Agreement, the Sanitation District's review of
the Authority's Plans will extend only to those portions of the Authority's Plans
that the Sanitation District reasonably concludes may have an impact on one or
more of the Facilities.
c. Deviation from Plans. It is contemplated that the Plans may be revised due to
concerns raised by either party regarding the method of protection proposed by
the Authority. The Authority shall not commence any work that deviates from the
Plans prior to the Sanitation District's approval, which approval is subject to the
Sanitation District's General Manager's sole discretion. The Sanitation District
will use commercially reasonable efforts to review and approve revisions to the
Plans within 30 days after their delivery to the Sanitation District and written
acknowledgment of receipt. If additional time is required, the Sanitation District
shall provide the Authority with a written notice identifying the additional time
requested.
d. If the Sanitation District reasonably determines that the proposed Protection
Measures for any Facility will be insufficient to protect that Facility, and that
modification of the Facility may be required to ensure its compatibility with the
Authority's Project, then upon the Sanitation District's written notice to the
Authority, the affected Facility will no longer be subject to this Agreement, and
the parties will enter into a separate utility agreement concerning the potential
modifications for that Facility.
e. Notification of Construction; Access. The Authority shall advise the Sanitation
District of the anticipated dates of construction activities related to the Plans at
least 30 days prior to the date of construction. The Sanitation District shall at all
4849-34 I 4-9962.1
56067585.vS
UTILITY AGREEMENT (Cont.) Page3 of9
UTILITY AGREEMENT NO.
UK204650
times have access to its Facilities, and the Authority and its contractor shall not
restrict or obstruct the Sanitation District's access to any Facility at any time.
f. Ownership and Maintenance. Ownership and Maintenance of the Facilities will
remain with the Sanitation District. Prior to the Authority's construction, and
within 30 days after the Authority provides notice to do so, the Sanitation District
will inspect each Facility by way of CCTV inspection or, if CCTV inspection is
not feasible for a particular Facility, by way of other reasonable means of
inspection. Upon completion of the construction by the Authority and removal of
any temporary protective devices, the Sanitation District shall be provided
reasonable time for final inspection of the Facilities to ensure systems have not
suffered any damage as a result of the Project's construction. The Sanitation
District shall provide written acceptance that the Facilities remain undamaged or
generate a punchlist of necessary repair as a result of Project within 30 days of the
Authority's request. The Authority shall be responsible for all damages arising
out of its Project and shall perform all necessary repairs to any Facility within a
reasonable time after notification by the Sanitation District, at the Authority's sole
cost.
g. Property Rights Acquisition. Nothing in this Agreement is intended to waive or
limit the Sanitation District's right to just compensation for all Project-related
uses of the Sanitation District's real or personal property. The Authority shall
acquire any necessary property rights from the Sanitation District in accordance
with state and federal law prior to undertaking construction of the Project on the
Sanitation District's property. The Sanitation District does not by this Agreement
grant, convey, or transfer any rights to use of the Sanitation District's property
and intends only to provide for the method of review and approval of plans,
inspection, and reimbursement of the Sanitation District's costs.
2. SANITATION DISTRICT'S COSTS.
a. The Facilities are lawfully maintained in their present location and qualify for
protection at the Authority's expense under the provisions of Section 703 of the
Streets and Highways Code.
b. The Authority assumes all costs associated with the protection of any of the
Facilities, including the Sanitation District's costs of plan review and inspection.
The Sanitation District does not benefit from the Project and therefore will have no
liability for any costs arising out of or relating to any protection of the Facilities
under or in connection with this Agreement.
c. The Sanitation District estimates that the cost of the Sanitation District's work
under this Agreement will be $94,682.00 ("Estimated Sanitation District Costs").
4849-3414-9962. l
56067585. v8
UTILITY AGREEMENT (Cont.) Page 4 of9
UTILITY AGREEMENT NO.
UK204650
3. SANITATION DISTRICT'S INSPECTIONS.
a. Sanitation District Inspection. The Sanitation District may inspect (and the
Authority shall provide the Sanitation District with access to) any phase of the
work for the purpose of the Sanitation District's inspection to ensure that the work
is in accordance with the specifications contained in the Plans and any related
construction contract. The Sanitation District shall direct all questions regarding
the work to the Authority's Resident Engineer for his or her evaluation and
recommended disposition.
b. Public Work. Inspections and field work described above in this Section 3 and
performed by Sanitation District employees fall within the exception of Labor
Code Section 1720(a)(l) and do not constitute a public work under Section
1720(a)(2) and are not subject to prevailing wages.
4. AUTHORITY'S PAYMENT FOR SANITATION DISTRICT COSTS.
a. The Authority shall construct any Protection Measures necessary for the Project at
no cost to the Sanitation District and shall pay the Sanitation District for its Actual
Costs (as defined in this section) of
(l) Administration of this Agreement (including planning, coordination, and
communication with the Authority) and review and approval of the Plans
(and any revisions to the Plans); and
(2) Inspection of the construction of any Protection Measures.
b. "Actual Costs" means the total fully-burdened salaries, wages, and equipment
costs including overhead and administration.
c. It is understood and agreed that the Authority will not pay for any betterment or
increase in capacity of the Sanitation District's facilities as part of this
Agreement, and that any request by the Sanitation District for changes in the
Plans that involve any such betterment or increase in capacity shall, if the
Authority accepts such proposed changes, be paid for solely by the Sanitation
District.
d. The Sanitation District shall not use any out-of-state personnel (or personnel
requiring lodging and meal "per diem" expenses) for its plan review, or inspection
work under this Agreement.
e. All costs incurred by the Sanitation District as a result of the Authority's Initial
RCLs of March 10, 2015 to review plans for the Project may be billed pursuant
to the terms and conditions of this Agreement.
4849-3414-9962.1
56067585.vS
UTILITY AGREEMENT (Cont.) Page 5 of9
f.
4849-3414-9962.1
56067585.vS
UTILITY AGREEMENT NO.
UK204650
Billing Procedure.
(1) Progress Bills. Not more frequently than once a month, but at least
quarterly, the Sanitation District will prepare and submit progress bills
itemized for costs incurred not to exceed the Sanitation District's recorded
costs. The Sanitation District's itemized progress bill must be signed by
an authorized official and prepared on the Sanitation District's letterhead,
compiled on the basis of Actual Costs incurred and charged or allocated
to the plans related to the Facilities in accordance with the policies of the
Sanitation District that conform to the accounting principles generally
accepted in the United States of America (GAAP) as applicable to
governments.
(2) Progress Payments. The Authority shall pay the Sanitation District within
45 days after receipt of the Sanitation District's progress bills. Payment
of progress bills not to exceed 125% of the Estimated Sanitation District
Costs may be made under the terms of this Agreement. The Authority
shall pay progress bills that exceed 125% of the Estimated Sanitation
District Costs only upon receipt and approval by Authority of
documentation supporting the cost increase and after an amendment to this
Agreement has been executed by the parties to this Agreement.
(3) The Sanitation District shall submit a final bill to the Authority within 365
days after the completion of the Sanitation District's acceptance of the
construction described in Section 1. If the Authority has not received a
final bill within 365 days after notification of completion of the work, then
the Authority shall provide written notification to the Sanitation District of
its intent to close its file within 30 days. All remaining costs will be
deemed to have been abandoned if not submitted to the Authority for
payment prior to such closure of the file. [f the Authority processes a final
bill for payment first received from the Sanitation District after closure of
the file, payment of the late bill may be subject to allocation and/or
approval by the Authority's Board of Directors.
(4) The final billing must be in the form of an itemized statement of the total
costs charged to the Project, less any amounts covered by progress
billings. However, the Authority shall not pay final bills which exceed the
estimated cost of this Agreement without documentation of the reason for
the increase of said cost from the Sanitation District and approval of that
documentation by the Authority. Payment of the amount over the
Estimated Sanitation District Costs may be subject to allocation and/or
approval by the Authority Board of Directors.
UTILITY AGREEMENT (Cont.) Page 6 of9
UTILITY AGREEMENT NO.
UK204650
g. If the parties anticipate that the Sanitation District's costs will exceed 125% of the
Estimated Sanitation District Costs, then the parties shall negotiate in good faith
an amendment to this Agreement prior to the payment of the Sanitation District's
final bill. Any and all increases in costs that are the direct result of deviations
from the work described in Section 1 of this Agreement shall have the prior
concurrence of the Authority and the Sanitation District.
h. Sanitation District shall retain detailed billing records for a period of three years
from the date of the final payment, and will make the records available for audit
by Authority, State and/or Federal auditors. The Sanitation District currently
complies with State law applicable to sanitation districts and generally accepted
accounting principles, which are generally consistent with existing Federal
regulations. Upon notice from the Authority, the Sanitation District shall comply
with any additional Federal regulations identified by the Authority as applicable
to the Sanitation District's actions in connection with the Project under this
agreement.
I.
5. TERMINATION.
If the Authority's Project is canceled or modified so as to eliminate the need for
the Protection of the Facilities, then the Authority will notify the Sanitation
District in writing and any party may terminate this Agreement at any time prior
to the commencement of construction by providing 30 days written notice to the
other party. The Authority shall pay the Sanitation District for all costs incurred
up to the date of termination. The billing procedures in Section 4 shall survive the
termination of this Agreement.
6. INSURANCE.
The Authority shall incorporate within the contract documents for the Project a
requirement for the contractor to obtain and keep in full force and effect
throughout the life of the Project insurance naming the Sanitation District as an
additional insured and in compliance with all insurance requirements in Exhibit B.
7. INDEMNITY.
a. The Authority shall be responsible for all costs, expenses, losses, fines, penalties,
civil administrative liabilities, and liabilities relating to the construction or
maintenance of the Project including any Protection Measure related to the
Facilities, and shall indemnify, defend, and hold harmless the Sanitation District,
its directors, officers, agents, and employees, from all claims, demands, actions,
costs (including attorneys fees), liabilities, losses, damages, including claims for
4849-3414-9962. I
56067585. v8
UTILITY AGREEMENT (Cont.) Page 7 of9
UTILITY AGREEMENT NO.
UK20465O
personal injury (including death) or property damages, penalties, fines,
administrative civil liabilities, and/or remediation costs arising from or in any way
associated with the following:
(I) Construction of any Protection Measure related to the Facilities, including
but not limited to trenching, backfill work above the pipe zone, and
pavement work;
(2) Any overflows or spills of wastewater from the Facilities arising out of or
relating to the construction of the Project; and
(3) Any claims for sewer capacity by any former discharger to the Facilities
that are impacted by any Protection Measure related to the Facilities.
b. This indemnity provision will survive the termination of this Agreement.
8. GENERAL PROVISIONS.
a. This Agreement contains the entire agreement between the parties concerning the
protection of any of the Facilities, except with respect to compensation for the
Authority's use of any of the Sanitation District's property rights. Any
amendment to this Agreement must be in a writing executed by both parties.
b. Each party has pa1ticipated in negotiating and drafting this Agreement, so if an
ambiguity or a question of intent or interpretation arises, this Agreement is to be
construed as if the parties had drafted it jointly.
c. A waiver of any breach of any provision of this Agreement or of any failure to
comply with any requirement of this Agreement will not be deemed a waiver of
any other provision or requirement of this Agreement, and no waiver will be valid
unless in writing and executed by the waiving party. An extension of time for
performance of any obligation or act will not be deemed an extension of time for
performance of any other obligation or act.
d. Authority represents and warrants that no federal or California state funds will be
used to pay Sanitation District under this Agreement. Sanitation District
represents and warrants that it will not use federal or California state funds in
order to perform any of its obligations under this Agreement. The parties agree
that they shall not seek or obtain payment or reimbursement from Caltrans for any
work, cost, expense, fee, obligation or liability that arises under this Agreement.
e. This Agreement will be executed in duplicate originals, one of which will be
retained by each party.
4849-3414-9962. l
56067585. v8
UTILITY AGREEMENT (Cont.) Page 8 of9
UTILITY AGREEMENT NO.
UK204650
f. This Agreement will inure to the benefit of and will be binding upon the parties
and their respective successors and assigns.
g. This Agreement will be governed and construed in accordance with California
law.
h. Each party shall execute and deliver any instruments, and to perform any actions
that may be necessary, or reasonably requested, in order to give full effect to this
Agreement.
1. The Sanitation District hereby delegates to its General Manager the authority to
approve any deviations from the Plans, in his sole and absolute discretion, as
contemplated in section 1 .c.
J. All notices or other communication must be in writing and be personally served
or delivered by United States mail, or nationally-recognized overnight carrier
addressed as follows, with a courtesy copy by email :
4849-3414-9962. I
56067585. v8
Sanitation District:
Orange County Sanitation District
10844 Ellis A venue
Fountain Valley, CA 92708
Mr. Rob Thompson
Director of Engineering
Email: RThompson@ocsd.com
Tel: 714-593-7310
Authority:
Orange County Transportation Authority
550 South Main Street
P.O. Box 14184
Orange, CA 92863-1584
Attn: Mr. Dennis Mak
Email: DMak@octa.net
Tel: 714-560-5446
Any party may, by notice to the others, designate a different address for notices
which will be substituted for that specified above. Any notice given as provided
in this section will be deemed to have been received, if personally served, as of
the date and time of service, or if deposited in the mail as provided above, fo1ty-
eight ( 48) hours after deposit in the mail.
Signatures on Following Page
UTILITY AGREEMENT (Cont.) Page 9 of9
UTILITY AGREEMENT NO.
UK204650
SIGNATURE PAGE
TO
UTILITY AGREEMENT NO.
UK204650
IN WITNESS WHEREOF, the parties have executed this Agreement on the dates below.
ORANGE COUNTY SANITATION
DISTRICT
APPROVED
' ArPROVED AS TO FORM:
Lewis Brisbois Bisgaard & Smith, LLP
By: ~s/4,:a OaireHervey o II ins v
Special Counsel
4849-3414-9962. I
56067585.vS
ORANGE COUNTY
TRANSPORTATION AUTHORITY,
a public entity
APPROVED
By:
rbfl-: Jun B
Executive Director,
Capital Programs
Date: fa /2c:v// '? 1 I
APPROVED AS TO FORM:
By:
Special Counsel
56067585.vS
Exhibit A
Relocation Claim Letters
m
OCTA
Do11no or omccro11s
Jeffrey I alloway
Clm1m~1n
I on Do11cl1.1k
Vic·ec:hmr
L1<,1 A &111011
O,wc.10,
J\11(/ff?1V[)o
D,re.;10,
M,chacl / lcml('ssry
O,rec/nr
S10,eJones
Oiroc/()(
J•1r KM,1po<hs
01f('t/O,
r.,uy A Miller
Dtrocto,
/IIM111my
DuOCIOI
Sl~IIV/l NQISOII
0,rccto,
M,g,rc/ l'ttlido
/hro,.;tor
/1111Shaw
0111'<'.IOI
IO<Jd Sp.um
Oitoctor
M,c/lc/1~ ~I"'''
{),ret:'fl,)t
l11111lmt
O,re<,/m
r,.,,,k u,y
(~1C(.IOf
GrlJ!IO,Y I W111/~tl>0tto1,1
O,rcWll
llym1 Chn111hcdJ111
f:v ()1/K;/Q MM1IJP<
Cl I/ff [ X(CIJT/VC CJfflC[
0.1uo/l ,follrison
r:111el r,crn1,.o 011,rcr
March I 0, 2015
OCSD
10844 Ellis Avenue
Fountain Valley, CA 92708
Allcntion:
Subj ect:
Mr. Rudy Davila
Project Manager
1-405 Improvement Project (EA -OHIO00)
Relocation Claim Letter/Utility Connicls
Utility ID No. OCSDI 172
Dear Mr. Davila:
201;, MR 17 hM 10: 50
·:_h~~f 1
Recr.::rili '.\r 1is\
The Orange County Transportation Authority (OCTA) in cooperation with Ca It rans, proposes to
improve the Interstate 405 (1-405) from 1-605 to SR-73. The environmentally selected
alternative includes reconfiguration of interchanges, intersections widening the freeway fo r
general purpose lanes and re-striping various locations along the corridor. It is anticipated that
the environmental approval wi ll take place this summer while OCT/\ continues th e process of
advancing preliminary engineering for utilities.
Enclosed is one prcli111ina1y map covering OCSD conflict areas of the proposed 1-405 Project .
Your Company's faci lities are wi thin the proposed project area and may be affected by planned
construction. These plans arc for your use in:
(I) Verifying your ex isting fac ilities as shown on the plans
(2) Complet ing your Conceptual Preliminnry Relocation Plans
(3) Identifying related casement requirements
(4) Develop ing your claim of liabi lity
This is a freeway and all ri ghts or access wi 11 be restricted. If the OCTA is liable for any portion
of your relocation costs, and if a consulting engineer will prepare any of your plans, a copy or
the proposed agreement with your consu ltant must be furnished lo this office as soon as
possible. Employment of a consultant for a fee based on a percentage of the relocation cost is
not acceptable. If desired, an example of a typical consultant agreement, along with the
Certification of Consu ltant, will be furnished upon your request.
II is the intent of the project to replace property rights "in kind" to existing terms. If casements
arc requ ired to relocate your fac il ities, ple11sc delineate your needs on the plans. Thi s
information is necessary as soon as possible so your replacement easements can be planned for
by the OCTA along with other lands required for this project. You may submit your casement
requirements ahead of your ovcrnll conceptual preliminary relocation plans.
Please submit the following information for review so a Preliminary Draf'l Utility /\grcement
ca n be prepared:
0101190 Collnty /'ranspurta/1011 Author,ty
550 Sol/Ill Maul Street I P o. Box 1,118t/ I Orange I Ca/domm 92863-1584 I /714) 560-0CTA (6282)
Page 2
I. Two sets of your conceptual prcliminnry l'Clocnlion plans wilh related casement
requirements, if any, and any changes to lhe ex isting facilities as shown on the State's
preliminary plans.
2. The date your ex isling facilities were inslallcd .
3. Your occupancy righls for inslallalion:
A. Fee-owned land
B. Easemenl {recorded)
C. Easement (unrecorded)
D. Prescriptive right
E. Joint Use Agreement (JUA) or Consent to Common Use Agreement (CCUA)
F. Franchise
G. State Permit
H. County Permit
I. City Permit
J. Joint Pole Agreement
K. Other (explain)
Please provide a copy of your documentation to suppo11 your occupancy rights claim for A, B,
C, D, or E above,
4. An itemized estimate of cos t for lhc preparation of yom concepllial preliminary
relocation design so a Design based utilily 11grccment can be prepared.
5. Your work will be performed by:
A. Own forces
B. Continuing contractor
C. Competilive bid contract
6. Your liability claim:
OCTA ____ % OCSD _____ %
The Project is currently scheduled for construction start in the summer of 2017.
Please submit your information to me by no later than April 10, 20 15. If yo u hav e any
questions or require additional information, please feel free lo conlacl me at (714) 560-5406.
Your Coopcralion is greally appreciated.
Sincerely, ~ ·
. Jos~ph Toolson
OCTA Project Manager
Enclosures: I) Conflict Map(s)
/-405 IMPROVEMENT PROJECT
ORANGE COUNTY TRANSPORTATION AUTHORITY
550 South Main Street, Orange, CA 92863
May 30, 20 17
Orange County Sanitation District
I 0844 Ell is A venue
Fountain Valley, CA 92708
Attention:
Subject:
Mr. Rudy Davila
Project Manager
1-405 Improvement Project (EA -OHl000)
Relocation Claim Letter/Utility Conflicts
m
OCTA
Utility ID No's: 1109, 1112. 1114, 1115, 1171, 1172, 1249, 4400, 4402, 4403, 4407,
4408,4650,6034,8097
Dear Mr. Davila:
The Orange County Transportation Authority (OCTA) has been working closely with your office to develop
a mea ns of addressing utilities potentially impacted by the proposed Interstate 405 from Interstate 605 to
State Route 73 (Prnject). In order to fac ilitate reviews of fac ilities owned by Orange County Sanitation
District (OCSD) which have the potential to be impacted or require protection from constrnction activity,
we are providing you with an additional Relocation Clai m letter which addresses fifteen (15) separate
facilities.
Enclosed arc preliminary maps covering these locations. These plans are for your use in:
(I) Verifying your existing fac ilities as shown on the plans
(2) Reviewing Prntection Plans as requ ired
(3) Identifying related casement requirements
For sewer systems within the Project area, it has been pre-determined by the Streets and Highways Code
that cost liab ility fa lls upon the Project for protection of sewer facilities as a result of highway construction.
Reviews and inspections may be requested by OCSD as a result of the Prnject which may include OCSD or
other support staff. If a consulting engineer is planned to be used to represent and support your efforts for
review of protection plans, a copy of the proposed agreement with your consultant is requested to be
furnished to this office as soon as possible.
Since this letter is being sent with regards to prntection of your facilities only, we do not anticipate any
property rights mod ifications.
We request that you investigate the fo llowing to support our efforts going forward:
I. Your occupancy rights for installation:
A. Fee-owned land
Easement (recorded)
Easement (unrecorded)
Prescriptive right
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
Joint Use Agreement (JUA) or Consent to Common Use Agreement (CCUA)
Franchise
State Permit
County Permit
Cily Permit
Joint Pole Agreement
Other (explain)
2. Source of how your work will be performed to support this agreemenl:
A. Own forces
B. Continuing contractor
C. Competitive bid contract.
3. Your liability claim for this protection work:
OCTA 100% OCSD
May 30, 2017
Page 2
0%
Design for the Project is currently scheduled to begin summer 2017 and construction will start in early
2018.
Please submit the information above as soon as available. If you have any questions or require additional
information, please feel free to contact .Joe Toolson at (714) 560-5406.
Your Cooperation is greatly appreciated.
Sinccrcl , --------~ ~ ~
Joe Gallardo ~ --~ ~<.
Manager Real Properly
Enclosures: Conflict Maps
cc: Jillian Gattuso, PMC
Kendall Zirkel, OCTA
Brent Scharnberg, Stadia Realty
~ ~
>£ I "' I .,. I .... ~ I ~§I
"' ~ .
► g
!::N ," ..J I -j::, j
:::> i v>
~
"' ,• i
\~
.· I a ~'. ~ .-! \if:~
I = ~ -~.._, --·~ ..-
' ... o_ •U • ., . . l~~?6·L---~~~✓"' ,,
. ·Jr~--~ l
-_-:_ ... ,_ ---·-·-·---·==
~~\, . ...::.:.. -.
,A... , .... .,.....,__., -"1'4-i°c?i -::::--•-== -s-····-,. ~-····~--J:...--:-:----•
· o/~~"' ,, t ·\fT1"!
. : ~~v,(al _ ,i_~, I : , . · t\ . .J l )0, J":l , ,~ , ,1: \··i ·;,, r'
.. v4 [3J ~ r l \j·~ . .,k . ~l~\'E?ol :~ I '.; 1;· ·td\,~;,~ <) ~
, ~-QSJ· ,Cl .. . ~--\. I :~u: I~ '·, .. ···"· 2.'· i ·' Q;, I;']' · CJ ,..-C .::: ... ~:~.'_:,·::·
,.. }('~ !oil~, C:'.) ., : lli jy/~ , I. r~ . t; ,1 /
'0..~'-v-..J j , ...r-• .: ( / -.. I 1. •• _ 1: I
l-n !33HS 33S Oli+9P'9 YIS ]N.11 1. ___ .r·• • ~--.....,, ~::,un i .. ~•
·lilllMN'lJ·•
YINIIOJllf) 1J ]IYJS
""I_ ~Cl Iii
-~ 0 ~a ~ u-u ~!:1 !' uo u
~
~
I~! _,
c ;
II ~1
~·
~ ~ u ~-80ROEA L•SI REVISED 111120\0
!Qlli_;
1, FOA C0"'1PLETE RIGHT OF W.t.Y DATA ANO ACCURATE ACCESS DATA,
SEE RIGHT or WAY RECORD MAPS AT DISTRICT OH ICE.
2, LOCAilONS OF UTILITY FACILITIES SHOWN ON THESE PLANS ARE APPROXIMATE ANO SHALL BE VER IF IEO BY CONTRACTOR PRIOR TO CONSTRUCTION.
3-UTILITY OWNERSHIP ON THIS PROJECT: CABLE -TIME WARNER CABLE/XO COMMUNICATIONS
ELECTRIC -SOUTHERN CALIFORNIA EOISON
GAS -CI TY OF SEAL BEACH/LONG BEACH GAS ANO OIL.I SOUTHERN CALIFORNIA GAS
OIL -CHEVRON USA/PLAINS All Al,£RICAN PIPELINE/ CRIMSON PIPELlNE
SEWER -CITY OF COSTA MESA/CITY OF CARDEN GROVE/ CITY Of SEAL BEACH/CITY Of WESTMINSTER/ COSTA MESA SANITATION DISTRICT/
COUNTY SANITATION DISTRICTS OF LOS ANGELES COUNTY/
FOUNTAIN VALLEY/
ABBRO J AT I OHS
AC CMSO CN CONN
CAOLAC
HP
kV LBCO LP LT
MPWOSC
ocso ocwo OH PAAP pp RPMP RLASO RT
ASBESTOS CONTAIN I NC COSTA MESA SANI TATION OISTR1CT CONFL ICT NUt.eER CONNECTOR COUNTY SANITATION DISTRICTS OF LOS ANGELES COUNTY HI CH PRESSURE KILOVOLT LONG BEA.CH CAS AND OIL LOW PRESSURE LEFT METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA CRANCE COUNTY SANITATION DISTRICT ORANGE COUNTY WATER DISTRICT OVERHEAD PLAINS ALL AMER I CAN PI PEL I NE POWER POLE
REINFORCED PLASTIC MORTAR PIPE ROSSMOOR/LOS ALAMITOS SEWER DISTRICT
RIGHT RIGHT OF WAY
mEb· OCTA (il/trans•
~
~
ELECTRICAL ---e-
CAS
OIL
SEWER --••1.-
TELEPHON£ ---t-
COMMUNICATION -·• t C-
, •• ,i tOJNll I ltQUTC
12 I aro I 22.,05
RCGISTf:REO CIVIL E~INCCR QATI
l"L.t..WS 41"1"ROV•L 0£T(
ORANGE COUHTY 1'AANSPOAUTIOJol AUTHORITY SSO SOUlH lilAIM STA£CT OAAHCE, CA 'J216l
METROPOLITAN WATER DISTRICT Of' SOUTHERN CALIFORNIA MIDWAY CITY SANITATION DISTRICT/
R/W SCE sec SWR
SOUTHERN CALIFORNIA EDISON SOUTHERN CALIFORNIA CAS SEWER CABLE TElEVISION -
ORANGE COUNTY SANITATION DISTRICT/ ROSSlr,()()RILOS ALAMITOS SEWER DISTRICT
TELEPHONE -MCI/OWE.ST/SPRINT/ TIW( WARNER CABLE/FRONTIER/ ORANGE COUNTY WATER DIS TR I Cl
WATER -CI TY OF CARDEN CROVE/C I TY Of' SEAL BEACH/ CITY OF WESTMINSTER/FOUNTAIN VALLEY/ CITY OF COSTA MESA ME.SA CONSOL IOATEO WATER/ORANGE COUNTY WATER OISTRICT ARMY CORPS OF ENGINEERS/ WEST ORANGE COUNTY WATER SOARO
TEL COND TV TWC y
VCP XO wocwe
TELEPHONE CONDUIT CABLE l£LEVISION Tl M£ WARNER CABLE VOLT VITRIF JED CLAY PIPE XO COMMUN I CAT IONS WEST CRANCE COUNTY WATER BOARD
WATER
CONHICT NO. ~
EXISflNC POLE ~
I
4, CONTRACTOR SHALL FOLLOW THE CAL TRANS "POL ICY ON THE HIGH ANO LOW RISK UNDERGROUND FACILITIES" WITHIN HIGHWAY RIGHT Of WAY, : \ / \ 5. SEE SHEETS U-40 THROUGH U-•0 FOR A L 1ST OF UTILITIES IN CONf'L !CT WI TH PROPOSED I liilPROVEMENTS.
&. PROTECT IN PLACE ANY UTILITY I MANHOLE, ELECTRICAL SIGNALS, ELECTRICAL CABINETS, ETC. l
NEAR AREA Of' CONSTRUCTION. IF ANY UTILITY IS DAMAGED DURING CONSTRUCTION THEN
~
~~ ~~ ~
:;; I· -I
IT IS REOUIRED THAT IT BE REPLACED IN KIND. a: r "' .
' ::, CITY OF COSTA MESA
'O -
---.... ... .,..--~-:,_'";-""'r",",.$.
::: ~
SB ROUTE 405 ~
• _ ••-LINE ~
,_.,. ---S -.----r -,-~-490 1 , 2 3 ' 4 S ' 6 1 8 9 500 -' _ -2---3 --4---· --& --7-~
NB ROUTE 405 ; ,. , -~'.t ;:.. -1--~. :
U!.f:IIIN.UC "(1U5£1MUICI
0CN FIL[ -CU·OIA41•ft
"' ~ "'
"' "
~ ...... 0
"' => z "' ~
C:.---:'!~ ,-=-..:;::-:-.;:,.
L 0 .•,, ;
~..:;~ ;:. u
,,_;·--' :.----... -'
~ ~
ICIO(L t,IM( 'i-C.OIOt'" C•I•" "O ,._QP
0,t,l( 11'1.0nto < ot1u1101, R£L•TIV£ 80AO£R SC•i..t IS IN INCH(S
..
-~ --
UN IT 2994
---z --· .. :-
PROJECT NUMBER & PHA5'(
UTILITY
U-1A
~ "
SCALE : 1 "=100'
00000000001
i;
~n
~I
~~
~!
?
8 I 0 _Q_
~:
~!
I ~
i '
'
111
I~!
Ii c, u ~-
'1•tl '°""" I ROUft
12 I 0.-o I 22-•0S m Eb· RtCJST[ft[O CIIIII. (NCIMf[ft OA"ii
OCTA lZllflans• h.ANS ""l"RO't,1.1.. OAT[
n< SI#£ or CAl /Ft;llltlA QII /I'S O'rlaA. 0,, A(:£11I$ SMM.l If/Of K lt£S/llfJltSIIU Tr,, ,/11£ A«ulAUDf aJMl't.£/£1<SS O' JC,AN/1/(l ja,,-1rs or fNIS /It.Ml SN[l/.
+-"' ·o: • "' w '°
CITY OF COSTA MESA
.
. 1:=-... -=-:_.~-=e ... ~-~.....,;,__-=--~-.:.-~--=-=---'--=-·-·1; ..
' ::> ... ... w % Ji ! ; · "' .., r ! --,!· :::
:;( SB ROUTE 405 ~ :1 "' o "A" l IN • '· ~ "'\-----+----:-+:--=-....... ---:--::--:-""!:"-:--::--::--<>.:--::t:--::--:~::-"'-::"!::--:---:;:--:--:-r~o--;~:-:-:~=-:-;=-=+=::=='i!:'~======:==='!=-==i===:!===;!'==~;=====c!===1===-==I• l . --. -~ ----· ,, -,&,, -.,, ---• _ ----_._ --~---:~' ~ :? , '.~'~tr:~,~ ~ ~ ~~ ~ ~ ~~~-~,_1_i:_:_rc:, ;
~ "' % u .. 2 ! I,
ORANGE COUNTY TRANSPORTATION AUTHORITY SSO SOUTH MAIH STRECJ ORANGE. CA 12Hl
UTILITY
U-2A
SCALE: 1 "=100'
BORDER LAST REVISED 7121'2010 IM:RH.1,1,t[ -itUSCRf!IUIEI
OC,i flt[ <:U•02A du1 o.~,.\~~ l ~~;~,~;:·' -~00 RE\.UIV[ 80AO[R $('Alt
IS IN INCHES UNIT 2994 PROJECT NUMBER & PH•SE 00000000001
i!
!!1
•► OG
►O
~!
:~ : ~
~
i
z
i
1§1 ~ i~I ~I
!al
ii
~I u ~-
.. .. "'
ril ,_:,• ,,, ... .,+<;
1."-
c,+ ~ ........
,. '> +'--...'
\
\
\.
\ ·,
,t,O .,..,,,
\_
' ·,
' ·, ·,
' ·,
\
·,
' ·,
\' \
~-.:___ '.--:'·. -~. _ __;.. 6--,-----,-...:,---~-·-
·,._
' \ \ \ ,.
·:.:. -.... -....
m•· OCTA liiltlans•
,1u l COUNTY I ROUT£
12 Oro 22-◄05
A(C:ISTtR[O CIVIL (N(;IN([R
~-,s .... PROYAL o•n
I
' ,W SIA ff /JI" CAI. IFOlflltlA (Ill /ft Qrrt&EA.,
QI# A&EJIIS SNM.l MIi I< ,rs,,o,,f/lU FOIi INC -'«llfAU Of C'Dltl'f.Fff~SS O' KAMEi CO-/rs (T INIS l'l.AN Met/.
()AAHCE COUNTY TRAHSPOAU.TION AUTHCIRITl' 550 SOUTH WAIN STR([l OAAHCC. CA 128'3
•...... r ~,~S1" ~ • • CITY OF COSTA MESA
~~-• icllf<COAD St
CHARLESTON St
. "~ --..., ~.-.. '-.:--...._ • .J . . · t E,15' R/W
_')_~~-t--'-=___...,.._1 .• .!.,.:~__,._..;...... .• ......____......._i.__..~__....----c:::-~ -I -t'' ,• ----------------· ·------------------·-----·-----------------------------------·----· . . \;
:,
-,~~-so ___ _
----~ ' a ' ' -. -' a : e ,i e ' i:i i ; ; r;; s; ; l ; ; ~ ; ,1 ,' ,'f-,' ,\' ' r, ~ ~ ', ' ,; ~: /15= ~; I! 0 ~ SB ROUTE 405
:, '".>. .. 1. INE = :: = --~ ~ :;: = s= :: ::!i = = 7: :: :.s = = c.t = !J◄Q: :: :t = =z= :: ~ ;! = = = = NS liOl.tTE:: 4fl5= : : : = = = : ---
"'
--~. -= ::7 =
=" ... .::
i = = s: .t'7~o :!!•CJ:?,,
--------------= = = = ~= -= = = = ~
-·
----~--
" u .. "'
·------~~---..........,....
E>tlS't R/W t
.-----· ------:~ ~:~ :-~ ~ I'~ -, ---=~'--',-_ -_ ,_ O _ -f -cc~-..:~ --,.,-~~-' _,
---,;..!'__,...J
--::--I" -~-:::,,=v ;: . ~
Ex;s, R/W 7,· "
ov.'-1-,; '
•"' <f. c,O
--------
•' -·,
UTILITY
U-4A
SCALE: 1"=100'
BQRO(A lASl R(VISEO f/2,-2010 ustCl:NUE ~IUSUflAW:ll
M M f'lof' .tll•IW•,t.,,. WOO(i. ~ ... (011111" (o l&fl -,_..,_, n•rr "'anrn ~ n111•1XHI AEL&flv( 80AOEA SC•Lt 1$ IN INCH(S UNI T 2994' PROJECT NUM8E~ & PHASE 00000000001
~; ~~ ii,
0 ~ > ~
l~;I ~~ r : ~
11 . .
~ g
I '
t!5
1!
Ii . d I~ • ae
t;I m•· OCTA laHmns•
I •ti COUNTY I ltOUl[
12 I o..o I 22.•os
Jl()Sf MllU T01AL HOJ[Cl
ill'(GISJUl(O CIVIL (NC:INCUII OATi
~LA1'1S _,.~0\'<14 OU(
I IJII/' Sf,11'£ IY '"''r(lllfllt,1 QII /IS 1Yr1(fA. IM ,1&£,tfT SIIM., /111111 Ill' Af'Sl"OISllt/' ""'
1~,:"f':."5:,r "'~"if.SJ IY SI• -
It
It 5 I't'.11:~TATiON AUTHOll'IIT SSO SO.,Tlol IU.IJII STRECT °"~-"'n"' I
◄ . ' :,
. > C
~ al
~
CHARL£S10N St
Exls=±R/W / • •
~' .... ~./,-. '. -·-·-·---· ___ :,_ ____ _
: : : : --: : : : : : : : : : : : : : : _, . :...;.· -1
fl 11
II 0 a: • "· ~
,..
C f,
CITY OF COSTA MESA
CARLINCFORO St
LONDOHOERRY St
..,_... --~~_...---~-----:-----......,_ -:----·:--~.;;;-~ . ..,.__-: _______ .....,......__ ____ . ____ ,(...,__-.. ~-wv------•--~--...,_-r-·--..,,.._--.--------·_._. ..
~----·-·-·-·-. . t. J :.... -_-:...-_-,;..-_-.--:;: ... ---=---~ -------·-----.,-• ..i
L Exls"T R1.w.:--l
. ----------
C 'f' :,
_ 11, ~lcr -= H= ·w=· _;1::, ::, t = = = = = = = = :::.-= =·=--·-=' = ~ --------------~i9= == t =1: ---~ ♦ =ii: = = -=t:=~,i;.--_-
--2w , e ~ if[iffj[fj[; ~ -------.:.
, ...
--------------
c. ---= = :SB:-R!)ufE :'.4 05 = = = = = ------
-•-L.0:1.1:. -::=: t __ ~1k --"'c-r
--4 --5---4 --•---8 --~ --6 --f>-11' ...=:! --
I :o
'f
--------: : ·m ~ t f ~ ~ t f~ RfU~E f °? ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ;~ ~ I T'f % ~ ~ ~ ~ [ J j j JTl j j j = :
--~--~~ ----: -....ai.
w ~ f=. c :: =:; = = ~ = ::i:: :: !i·=-= ~ ~ t-·
:,
BUCKIN~~~r E ------7
X1$f A/W
57J
,1.1_
'~I I
11
II
11
" ii
l.:i-------------,r -----f r --,--· ,.; -,,1--___ .: :;; ~ !t r~:!.~--~T.". :c.·..:_:~.-~ ~•~_:.:·-:-·-::::-:c·-·-:, -,---"---'--~-tlj . .. ~ ~ ::1 ~ . ·., .-. ,..-. . . . · · · -----_-------c·;;~;~;T-' '
II ., " f
.n IO ,,
1,11 11.
l.-.011 11' I
ii ii
II
II
...,..,.
"' :a "' a
UTILITY
U-SA
SCALE : 1"=100'
lo '~ ~
◄ 0
80RO(III 1.AS1 M:'t'ISEO rnno,o ~ ,~~:.~-!~t> ..-Cl,.,... ~c.,.,.(alarl_,,.._ ,..,r .,.m,,.,. ,,1 n11i."111, A£&.4f IY( MIIIIO<• SC-~E IS IN INCl'l[S UNIT 299-1 PROJECT NUM8£R 4 PHASE 00000000001
,...--
~ lltJll
<t
V) w " <t >-V) 0 u
u. 0
>-1-
"(" .,
I 11'(1
"-!" I 1\·111
I 11111
1 ,n,,
I 11111
111\I
I \~II .~ ..
I UJI I
I 1d>I\ 0 ,a:,,
•~11
I 111\1
11111
I\ I\ I I I I\\\ I
,tP\I I I II\U
I\\ II
\\\ .
II
II
II
I II
II
\-'\
\ \ \ . ' ..
\: . ; . '
\ \
!
I i i i i / /
/
/ i
i
I i
.!l I
I
I
I
I
i
I
.. .. ..
i
.. , ,
c/3Alcl /fN/f /t.iN/fS
QJSIAJ~ l UO
>.8 Q)SIAl~
,::.
-:,
L
>•n JJ]HS
i
r--;-
!: .. . . :8
1\.s-grJ,~vd I I
,. . '
__ , -··-~ -·-----1-::c::
] ~
<l \ 1/) w ,.
<t ....
1/) 0 u
u. <>
>-.... u
t-n
J.8 Q])IJ)HJ
~J1Pt~J~:g
3Nl1 H)Un
NOIIYll!OdSNYHl
I
i j
!
!
,
.>
t, ... !: ~
\ a:
>-w -' ·!il. >
~ ·, \
·.\
--!: ' ,, <l .... z ::,
~
u. 0
>-.... u
.,, -
0 I
·SUDJHID•I/JI ~
YIN!IOJllYJ JO llYIS ~ JO JNJIIHIVdJO •
~: ~~ a!:? ~~ uo
~ ~ ~
~
z
;:!
~ ~ u ~·
~
BOA0ER LAS1 REVISED 712/2010
\
'x· /
•.' •J ,,
'• ' ..,,,.,~"'•'_ .. -
-;;f
:Ft
USERHAM( •> (USEAIWl£1 nr.1,1 J'IIJ' •> u-n,_,,.,n
·•;;:-__:::
\' \ . .,·
~ .,, ~;..,>,
/
• ·.,:,x~
' ... ~<c,.L
~, \ '\:".· . /'.: \ .. , ... ~~-
_,,,.,;,1··
~ ~ ~' ~~ I ,, \, \\, \.,4• •.
' \ ,~ ....... ,...-"\,1: .... \'''
.'/::,. \, \,'
~~ ---...__Exist R~ --~ ..
<,'<''-"-~ ,;-'l.
"-s"-"-_.,~c." 1,\'o
,-•'
l-i '...t / ~/ •
,
\
\ m1=t:
see
s,s,ee,.
Exist~-9'
~"flTY OF FOUNTAIN VALLEY
\ \
-, >--·.,,.,.
,..-··,,..
0111 I COUNTV I ROUTE
121 o,o I 22.•os
R[CISTEREO CIVIL ENCJNEER
PL.ANS APPROVAL DATE
/Ht Sf,1n Of' (M.IFORW/,1 CR Ifs Of'F(C£KS Olf ,1C£NrS SIWl l<f)f 8£ R£Sl'ONSl8U Ft:R IN£ A((U/,IU ()II ('(Jl,ll(£1[!,£SS Of' SCAWCD l'Ol'l£S Of' /HIS PUN SN££/.
ORANCE cou,nv TRANSPORTATION AUTHORITV 550 SOUTH MAIN STREET ()RANCE, CA 92863
\ \ .-.:,.;;.(~
...
½°
·&"" ~ !,,' <E
...00[~ H-a) Color blu; Ho ,-,.op OAT[ PI.OfT(O •> 07114/2'016
-:.:·.:··
.~t,....ie , .• ::-,,·,:•ti \• .--t~• . .,c":1-~
'~( . "'-,~-_,., ..
~:. ~\""": -
'·'\ ··-.,.\\ ~. \,
\ J'
RELATIVE BORDER SC•Lt IS 1/11 INCt◄ES
,,
:.
a,
"'
UNIT 2994 PROJECT NUMBER & PHASE
UTILITY
U-3
SCALE: 1 "=1 oo·
00000000001
s
s ~
~i a~ 5~
@
I
ls
z I ~ u ~-
-----
..... ',
<., ~-,,. .. ~ '·
\ ·-, ..........
!
' ··/x-,
c.,'<v~/~.,.c; ,~'f /,o~<o.
~<,,~·,..,.,;,.
, o~/ x-,0~'
d;/o'' . ,,
mEb· OCTA (af/rans•
VILLA YORBA
0111'1 COUNTY I ROUT(
1 2 I Oro I 22, •05
REGISTERED CIVIL EWCIN(EA
PLANS APPROVAi.. 0,U(
IN( s,,,,r or CALJrONN,,, ON trs ()ff/(£RS OIi ,C£NfS SH,u II()/ IJ£ R£Sl'ONSl8U FOIi /H{ A((t/l(A(r OIi co,,t£([N(SS or S(JWl{f) coP/£S tT TH/5 Pl.."1f SN££!.
ORANGE COUNTY TRANSPORTATION .t.UTHOAllY 550 SOUTH MAIM STREET CRANCE. CA 92861
~ '
'<:;:~ " .['_'.~'.:.: ______ : :
'-, \, ~--"~'"' ~. • , , --·-·---:· -' ' ' '·c · ---• '\" ~ ''""'" -•'-•·· ,, --• ··cc cc --
o '-, "• ~ • -•-C C C c · • • ' . '·· " ' ~ -. -' ' :, Ex;s, R/W l '\ •---·::·=·=·--B J . . --· -· -c:· --
,,.J __ . / c;' "'
:,
.;;
~ .. :,
-4---:i ----------------------------------7_._-:_._-_._-; __ -_ :;.-: ;.-;. :
-·-·-:--·---~=·-;:.:::;~-----·-·-·~..,,....-'\. __ ~" ----~~ "! : -----·-·-7 ,. '\ '\ ~ ,,.. .. ,_ ·~£?
-· ,-(",i;,;;R/W .,._.,,_~,~-"• •,'\ '\~ •,,-'
\ . )-:~---', .'\ '\ "-.~~ >' \
' .'\
-..... /~ '\s,,.~
-.<e,, ;' -.-' ~--··· '\'-~ .... / i~" ~ '{.r, f _,<,,"'-~ " <5< "\
'\
{;: ! 1 <,;
~ ~ {l ~
"'
·, ,:,~· ~
'\, ,/
t
k, ,fl G ·-, ..
... \.
,} ~ cJ ,:, ~
\
,,-·-, ..
'·
,,,.,_
-l--~ -"' --, , '·'·-·'··'··'··':··'·:'·:'··' ,._, __ ,_,_, 'C ----~.-'.·-:::~':-:-_11
___ ·s = ;,...,~4:...:,-,.:-~r.---, .;.,:==:;:::;;~7,; .:..,,=-==--~ Ex;st R/W 2 £0/NCER CHANNEL
·,
'•. ·,,_
v~~·•, ••• ~r..p ·~_,, .r,
-.
l >T
CITY OF WESTMINSTER
CITY OF
HUNTINGTON BEACH
·.,:. ·,_ ~
~ .{" ,;.1.-#::✓~
<;) ' ~ /. " -;,,
/ ....
"' •✓ ., -i~
~,:,'I'
~ .. •
UTILITY
U-11
SCALE: 1"=100'
BORDER LAST RE:VJS[D 712/2010 USCANAI,€ •> CUS(ANAM( J
,.,..., "" C' • ~ ... " "'"'
..ao(LfriA.111[ •> co1or-,.i .. ;NOP.-op
04TC'PL0Tl(0 •> 0IIIU201, RE.LAT1VE. 80ROER SC•LE IS IN INCH(S UNIT 2994 PROJECT NUMBER & PHASE 00000000001
0
0
L
~ •'
~ '
ij!! ~p.: 5.~1 ~-1 ~t ~ ' ~ i ~ ~ ~ l1t~;::
i ~ ~ ..... i : M~ u il 3i'i 0 ~ e ~ l b t 0 . ~~,~
:r. ~, ""
~ ~ ~ ~ ' . • lgl§ ;;
f j
El
/
Ol51Altf JJ.YQ
J.8 OJSIA]tl
Ill
I Ill
I 11,11
i Ill
i 1111 s i 111 1 . . I Ill
~ 1111
1111
1111
'1111
Ill
1111
1!11
1111
i11t
1\1
1111
1111 ,,,
1111
1111
f' II
1111
1111
1111
1111
0 1;111
1111
'c:i"
1111
Ill
Ill
Ill
Ill
,.
1111
1111
•ji11
'Tl I II ,1,,
1111
11 11
I~ 11
1111
1111
1111
1111
1111
I .
.,. 1111
I . I 11,11
I 1111
I 1111
I I 1111
I 1111
I I 1111
I I 1111
I I 1111
I I 11'11
I 1111
I 1111
s
'l' ''·· ' ,1
ii ~--·-I
! I
I
i
I
I
~' \
I
I
Pt-0 ll]HS 33S OS+906 Y1S 3NJ1 HJL'lfN
.l8 OJ:t:J)HJ
L ;:; ... "' l;;'
z w 0 i5 "
;; 0 0 0 0
► 0 0 0 0 I-u, II 0
' 0 -,.... 0
..,I I j::::, L,J
...J <( ~ u 1/)
w '1/ ;:; ..
"' w ~ :, z ... ~ ~ ..
0
I
~
•SUINNID·• ~
YINllOJllTJ JO 31Y1S ~
lo1u I COUNTY I MOUTC POST lil1L£S !OT Al P~_.IJC_l
Ill ,m Eb·
az/trans•
12 1 Oro I 22.,os
FIECISTEFIEO CIVIL Ef'tCtt<t!(ft o'.ii
PL,....S APPROVAL OAU:
IN(,,,,,, (T (.al.1'Qlll/,//,I 0,, IIS arrJC£A:S 0,, ~NIS SIUl.l IIOI IC llf"ll'OIISNIU 'Cit IN£ ..autKr Of/t (Otl'cLl{lll(SS or KMIIICJ, aJl'JCS or INfS /It.Ml ~{I.
§: ~~ ;~ UD
~ ~
~
i
~ ~ ~
~ ~ g
l5
~ ~ ~ u I~ t
BORDER LAST REVISED 1'1212010
,D
::,
w 1 wr·-'
Exist R✓W_ \
CITY OF WESTMINSTER
WESTMINSTER MAll
=
v"
''<-«-.,,, ...
..;."'"
.,
.£_~x;s, RA! •~l ~
-·">-·-· ~ --~---~~-----..,,.--,--=----=---=-:-::i ~ ---= .=/-= = = ~-~ = = = = = = =r-= =-= ~ f ,, , : : : './'.'. , '.''." , , , , ~.~L!~.t' HiU ---------------~ ______ 3B=.flQUtt~o::i __ --------· .... ~-•-...... ----n-.. -.. ,..,-------~ ! frs'ei:•,-,";,-t,,-,-;,-:·:: ,-,:;'.,:~~, ;,-_: _-,-, =;;; ; : , ;·; = ",:;; ~ i:,;; r t;=:-;, j
·-., ~ ·----~.~---ta .--~ ,--~ .. ----~-; ·-r r 5
..J / • ' • ·:' \_ Exis-r R/W =: ::r ✓ Ex1s1 R/W -~ ....,. , ,, '-,, • ::t: ~ ✓--~ "· ~✓ ..: "
.,,
f1.
,;
USERN.WC •> lu\CRHA.wCI ,.,. ... "" ~ . ' ... '' .....,,
SOWELL Ave •
lilOD(L M&lil( ., Co•Of"l•I••:,_ ''OCI 11nr .,nTrtll .) n1,u,1e1,11,
.g " .,,., .;; ,.,,,
ftELAllVE 80AO£A $CALE IS IN INC-HES
/ / , .,, /
<;-'<-/
.,,, ...
..;."'" /
v"
UNIT 2994
•.•··
PROJ£.CT NUMBER & PHASE
UTILITY
U-17
SCALE: 1"=100'
00000000001
.~ 2; !j
~2
~; ~~
i!
? g r-ig
,-
CITY OF WESTMINSTER
ii ~vi ~:!!
--!ii
ii Exist RIW.
:-... •:.'!"'r'""';;
I!, ,, •
·«
~
f!J
"" ~~ ,, • ,"'Y(( ~
.p_. <~
BORDER LAST R(Vl'S(D 712/2010
., ... ,
Exist
~ .,,,~ .•
-i'
./
USCRHAMC •> IVS(ftftl,t,M()
. ,
J'~
s,1-"o "--"'<(' "'"' ~ \."';
,1.),"-.•r~,..,.
~:>f •. ,.:
:'ls.,,._,_
✓ ....~.p'
...,
M00£llll,lt,lil£ •>Cc»r (.,u :,_,,.00 .... ~ ....... ~ .. -· "''···-·-AE1.•t,~v~..,e~~~~~ SCAl[
i'., /
, ·:;,,//. .:>X.
-~.ij
'\.
---
~m •· ta/trans•
I'
-·""-.
. "
,, ;>< ,,v-,,,\,/ · . -, r,'
'" .. 1
' .I rE~"". 1
~.-t-•• ~-=-=..:....::
1:.., ...
'
~ . ..
HEFLEY St
101., I COUMT'f I ltOUft ,OST WlltS '!_OU.~t
121 Ora I 22,,os
R[C.IST[ll[O CIVIi. [NC;INUA
PLANS ,._""0YAI. OA 1[
~ SI_.,( 0, CM.l'Oflll• QII US QrrllTI$ OIi MXJlf'S $1,1,,it 111111 llr llfS,/IOf,tSflt£ re,, INC,ICCUl,Kr0/ICOIJll!t£ff~1Sor~ tr,l("S or IN/$ /l(M S/l<rt,
., ....
2 :,
.., ..,
3i ..,
~
~
~ ~
OAAHCC counY TRANSPOftT AT IOfil AUTHOR I TT SSO SOUTH iU,IM STIIECt OftAHC(, CA t286l
UTILITY
U-19
SCALE: 1 "=1 oo·
UNI I 2994 PROJECT NUMBER & PHASE 00000000001
.. ? :;~ ~~ ~!
Do ~~ ~~
~!
56067585. v8
Exhibit B
Insurance Provisions
EXHIBITB
Insurance Requirements
1. The Authority shall be the lead agency under the California Environment Quality
Act of 1970, California Public Resources Code § 21000 et seq. (CEQA), as amended, for the
Project.
2. The Authority shall award a construction contract for the Project to a contractor
appropriately registered and licensed to practice in the State of California, including with respect
to performance and implementation of the work ("Contractor").
3. The Authority shall be responsible for the award and administration and
performance of the contract, including supervising the implementation of the Project and the
Contractor's performance in accordance with the requirements, provisions and restrictions of the
contract. The Authority shall diligently proceed with the contract award and Project
commencement promptly following the execution of this Agreement.
4. The Authority shall incorporate within the contract documents for the Project a
requirement for the Contractor to obtain and keep in full force and effect throughout the life of
the Project, for the mutual benefit of the Sanitation District and the Authority, a policy or
policies of comprehensive, broad form, commercial general liability insurance written on ISO
from CG 00 01, or a substitute form providing liability coverage at least as broad in the amount
of $3,000,000 limit per occurrence with a $3,000,000 aggregate and automobile insurance
against claims and liabilities for activities of the Contractor in the amount of$1,000,000
(combined single limit per occurrence).
(A) The policy or policies will name the Sanitation District and their
respective elected and appointed officials, officers, agents and employees as additional insureds
using ISO form CG 2010 or CG 2033, or a form at least as broad and shall, additionally, contain
language providing for waiver of subrogation. The policy or policies will include a primary and
non-contributory endorsement using ISO form CG 20 0 I 04 13, or a form at least as broad,
evidencing that the policies are primary and noncontributing with any insurance or self-insurance
that may be carried by the Sanitation District or other third parties, and that said insurance may
not be canceled or materially changed except upon thirty (30) days written notice to the
Authority and the Sanitation District. The policy or policies shall include a Products and
Completed Operations endorsement using ISO form GC 2027 (ed. 10/01) or a form at least as
broad.
(B) The Authority shall also require that workers' compensation benefits are
secured by the Contractor as required by law, and provide an endorsement waiving all rights of
subrogation against the Parties to this Agreement with regard to any workers' compensation
claims, including any such claims against the Sanitation District.
(C) Prior to the issuance of the Notice to Proceed to the Contractor, the
Authority shall provide the Sanitation District with policies and endorsements naming the
4818-0017-799 I I
Sanitation District as an additional insured for the general liability and automobile liability
policies described above.
(D) In addition, the Authority shall require its Contractor to obtain pollution
liability insurance written on a claims-made or occurrence basis, that covers losses related to the
release or the threatened release of pollutants into the environment arising out of or resulting
from the Contractor's performance of the Project. The minimum limits of Pollution Liability
shall be $2 million per occurrence/$2 million policy aggregate. When this coverage is provided
under endorsement to the general liability policy, the $2 million per occurrence must be a
sub-limit. The pollution liability policy shall also contain an Additional Insured endorsement
and a primary and non-contributory endorsement naming the Parties to this Agreement.
(E) If the Contractor maintains higher limits than any minimums above, the
Sanitation District will be entitled to coverage for the higher limits maintained by the Contractor.
5. The Authority shall require that any and all labor and materials bonds and
performance bonds required to be supplied by the Contractor for the Project shall include the
Sanitation District as a named obligee, and Authority shall not release any bonds unless and until
the Authority has determined, and the Sanitation District has concurred in writing, that the
Modification has been successfully completed without damage or impact to Sanitation District
facilities or operations.
4818-0017-7991.1
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2022-2199 Agenda Date:4/6/2022 Agenda Item No:3.
FROM:James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1, PROJECT NO. FE20-07
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Recommend to the Board of Directors to:
A. Receive and file Bid Tabulation and Recommendation for Santa Ana Trunk Rehabilitation at
Plant No. 1, Project No. FE20-07;
B. Award a Construction Contract to Sancon Technologies, Inc. for Santa Ana Trunk
Rehabilitation at Plant No. 1, Project No. FE20-07, for an amount not to exceed $395,082; and
C. Approve a contingency of $79,016 (20%).
BACKGROUND
The Santa Ana Trunk, which carries sewage from the southern portion of Santa Ana and the northern
portion of Costa Mesa to Orange County Sanitation District (OC San) Plant No. 1, was originally
constructed in the early 1950s. The final 300-foot section of this sewer just west of the Santa Ana
River is constructed of unlined 48-inch diameter concrete pipe.
RELEVANT STANDARDS
·Comply with California Public Contract Code Section 20103.8, award construction contract to
lowest responsive, responsible bidder
·Maintain a proactive asset management program
PROBLEM
A condition assessment of this sewer and associated maintenance structures revealed severe
defects, including exposed aggregate and reinforcement steel in the pipeline, as well as exposed
aggregate and liner detachment in the maintenance structures.
Orange County Sanitation District Printed on 3/29/2022Page 1 of 3
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
File #:2022-2199 Agenda Date:4/6/2022 Agenda Item No:3.
PROPOSED SOLUTION
Award a construction contract for Santa Ana Trunk Rehabilitation at Plant No.1,Project No.FE20-
07.The project will install a cured-in-place liner in approximately 300 feet of trunk sewer and perform
rehabilitation of two maintenance structures at Plant No.1.To accommodate installation of the liner,
staff has determined that flows in the sewer can be completely diverted to a parallel sewer,so bypass
pumping will not be required.
The flow diversion must be coordinated with major shutdowns for Headworks Rehabilitation at Plant
No.1,Project No.P1-105.To avoid impacting this much larger construction project,the lining and
associated diversion must be conducted during the wet season.This coordination might require staff
to authorize changes on short notice.For that reason,staff is requesting a higher-than-usual
contingency of 20% of the contract value.
TIMING CONCERNS
The schedule driver for this project is to resolve the current deficiencies to reduce the risk of pipeline
failure.
RAMIFICATIONS OF NOT TAKING ACTION
Without this project, the pipeline is at risk of failure, which would cause a major sewage spill.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
OC San advertised Project No.FE20-07 for bids on January 11,2022 and one sealed bid was
received on March 1, 2022. A summary of the bid opening follows:
Engineer’s Estimate $345,000
Bidder Amount of Bid
Sancon Technologies, Inc.$ 395,082
The bid was evaluated in accordance with the OC San’s policies and procedures.A notice was sent
to all bidders on March 14,2022,informing them of the intent of OC San staff to recommend award
of the Construction Contract to Sancon Technologies, Inc.
The work includes installing large diameter pipe and manhole liners performed by specialty
contractors.Since there are limited contractors qualified to perform this work,OC San staff surveyed
prospective bidders prior to receiving bids,and four firms were expected to bid.After receipt of a
single bid,a post-bid survey was conducted.In the post-bid survey,potential bidders stated that due
to the unique nature of the work and overall market volatility,they were not able to secure pricing
from potential subcontractors.The one bid was from a contractor that will self-perform the
specialized work.
Orange County Sanitation District Printed on 3/29/2022Page 2 of 3
powered by Legistar™
File #:2022-2199 Agenda Date:4/6/2022 Agenda Item No:3.
The bid was 15%higher than the engineer’s estimate,which is within the accuracy of the engineer’s
estimate.For that reason,staff has concluded that the price is fair and reasonable.Resoliciting bids
would likely not significantly reduce the price and would require additional staff time and substantially
delay the repairs.
Staff recommends awarding a Construction Contract to the responsive and responsible bidder,
Sancon Technologies, Inc., for a total amount not to exceed $395,082.
CEQA
The project is exempt from CEQA under the Class 1 categorical exemptions set forth in California
Code of Regulations Section 15301.A Notice of Exemption will be filed with the OC Clerk-Recorder
after OC San Board of Directors approval of the construction contract.
FINANCIAL CONSIDERATIONS
This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has
been budgeted (Budget Update,Fiscal Year 2021-2022,Appendix A,Page A
‑
8,Small Construction
Projects Program, Project No. M-FE) and the budget is sufficient for the recommended action.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Construction Contract
CF:jw
Orange County Sanitation District Printed on 3/29/2022Page 3 of 3
powered by Legistar™
C-CA-102621
PART A
CONTRACT AGREEMENT
C-CA-102621
TABLE OF CONTENTS
CONTRACT AGREEMENT
SECTION – 1 GENERAL ....................................................................................... 1
SECTION – 2 MATERIALS AND LABOR ................................................................ 4
SECTION – 3 PROJECT ........................................................................................ 4
SECTION – 4 PLANS AND SPECIFICATIONS ....................................................... 5
SECTION – 5 TIME OF COMMENCEMENT AND COMPLETION .......................... 5
SECTION – 6 TIME IS OF THE ESSENCE ............................................................ 5
SECTION – 7 EXCUSABLE DELAYS ..................................................................... 6
SECTION – 8 EXTRA WORK ................................................................................. 6
SECTION – 9 CHANGES IN PROJECT.................................................................. 7
SECTION – 10 LIQUIDATED DAMAGES FOR DELAY ............................................ 7
SECTION – 11 CONTRACT PRICE AND METHOD OF PAYMENT ......................... 7
SECTION – 12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF FUNDS ............................................................................................. 9
SECTION – 13 COMPLETION ................................................................................ 10
SECTION – 14 CONTRACTOR’S EMPLOYEES COMPENSATION ....................... 10
SECTION – 15 SURETY BONDS ........................................................................... 12
SECTION – 16 INSURANCE .................................................................................. 13
SECTION – 17 RISK AND INDEMNIFICATION ...................................................... 21
SECTION – 18 TERMINATION ............................................................................... 21
SECTION – 19 WARRANTY ................................................................................... 22
SECTION – 20 ASSIGNMENT ................................................................................ 23
SECTION – 21 RESOLUTION OF DISPUTES........................................................ 23
SECTION – 22 SAFETY & HEALTH ....................................................................... 23
SECTION – 23 NOTICES ....................................................................................... 23
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 1 of 25
CONTRACT AGREEMENT
ORANGE COUNTY SANITATION DISTRICT
PROJECT NO. FE20-07
SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1
THIS AGREEMENT is made and entered into, to be effective, this April 27, 2022, by and
between Sancon Technologies, Inc., hereinafter referred to as “CONTRACTOR” and the
Orange County Sanitation District, hereinafter referred to as “OC SAN”.
WITNESSETH
That for and in consideration of the promises and agreements hereinafter made and exchanged,
OC SAN and CONTRACTOR agree as follows:
SECTION – 1 GENERAL
CONTRACTOR certifies and agrees that all the terms, conditions and obligations of the
Contract Documents as hereinafter defined, the location of the job site, and the conditions under
which the Work is to be performed have been thoroughly reviewed, and enters into this Contract
based upon CONTRACTOR’s investigation of all such matters and is in no way relying upon
any opinions or representations of OC SAN. It is agreed that this Contract represents the entire
agreement. It is further agreed that the Contract Documents are each incorporated into this
Contract by reference, with the same force and effect as if the same were set forth at length
herein, and that CONTRACTOR and its Subcontractors, if any, will be and are bound by any
and all of said Contract Documents insofar as they relate in any part or in any way, directly or
indirectly, to the Work covered by this Contract.
A. Contract Documents Order of Precedence
“Contract Documents” refers to those documents identified in the definition of “Contract
Documents” in the General Conditions – Definitions.
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 2 of 25
1. In the event of a conflict between one Contract Document and any of the other
Contract Documents, the provisions in the document highest in precedence shall be
controlling. The order of precedence of the Contract Documents is as follows:
a. Supplemental Agreements – the last in time being the first in precedence
b. Addenda issued prior to the date for submittal of Bids – the last in time being the
first in precedence
c. Contract Agreement
d. Permits and other regulatory requirements
e. Special Provisions
f. General Conditions (GC)
g. Notice Inviting Bids and Instruction to Bidders
h. Geotechnical Baseline Report (GBR), if attached as a Contract Document
i. Plans and Specifications – in these documents the order of precedence shall be:
i. Specifications (Divisions 01-17)
ii. Plans
iii. General Requirements (GR)
iv. Standard Drawings and Typical Details
j. CONTRACTOR’s Bid
2. In the event of a conflict between terms within an individual Contract Document, the
conflict shall be resolved by applying the following principles as appears applicable:
a. Figured dimensions on the Contract Documents shall govern. Dimensions not
specified shall be as directed by the ENGINEER. Details not shown or
specified shall be the same as similar parts that are shown or specified, or as
directed. Full-size details shall take precedence over scale Drawings as to
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 3 of 25
shape and details of construction. Specifications shall govern as to material
and workmanship.
b. The Contract Documents calling for the higher quality material or workmanship
shall prevail. Materials or Work described in words, which so applied, have a
well-known technical or trade meaning shall be deemed to refer to such
recognized standards. In the event of any discrepancy between any Drawings
and the figures thereon, the figures shall be taken as correct.
c. Scale Drawings, full-size details, and Specifications are intended to be fully
complementary and to agree. Should any discrepancy between Contract
Documents come to the CONTRACTOR’s attention, or should an error occur in
the efforts of others, which affect the Work, the CONTRACTOR shall notify the
ENGINEER, in writing, at once. In the event any doubts or questions arise with
respect to the true meaning of the Contract Documents, reference shall be
made to the ENGINEER whose written decision shall be final. If the
CONTRACTOR proceeds with the Work affected without written instructions
from the ENGINEER, the CONTRACTOR shall be fully responsible for any
resultant damage or defect.
d. Anything mentioned in the Specifications and not indicated in the Plans, or
indicated in the Plans and not mentioned in the Specifications, shall be of like
effect as if indicated and mentioned in both. In case of discrepancy in the
Plans or Specifications, the matter shall be immediately submitted to OC SAN’s
ENGINEER, without whose decision CONTRACTOR shall not adjust said
discrepancy save only at CONTRACTOR’s own risk and expense. The
decision of the ENGINEER shall be final.
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 4 of 25
In all matters relating to the acceptability of material, machinery or plant equipment;
classifications of material or Work; the proper execution, progress or sequence of the
Work; and quantities interpretation of the Contract Documents, the decision of the
ENGINEER shall be final and binding, and shall be a condition precedent to any payment
under the Contract, unless otherwise ordered by the Board of Directors.
B. Definitions
Capitalized terms used in this Contract are defined in the General Conditions, Definitions.
Additional terms may be defined in the Special Provisions.
SECTION – 2 MATERIALS AND LABOR
CONTRACTOR shall furnish, under the conditions expressed in the Plans and Specifications, at
CONTRACTOR’S own expense, all labor and materials necessary, except such as are
mentioned in the Specifications to be furnished by OC SAN, to construct and complete the
Project, in good workmanlike and substantial order. If CONTRACTOR fails to pay for labor or
materials when due, OC SAN may settle such claims by making demand upon the Surety to this
Contract. In the event of the failure or refusal of the Surety to satisfy said claims, OC SAN may
settle them directly and deduct the amount of payments from the Contract Price and any
amounts due to CONTRACTOR. In the event OC SAN receives a stop payment notice from
any laborer or material supplier alleging non-payment by CONTRACTOR, OC SAN shall be
entitled to deduct all of its costs and expenses incurred relating thereto, including but not limited
to administrative and legal fees.
SECTION – 3 PROJECT
The Project is described as:
PROJECT NO. FE20-07
SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 5 of 25
SECTION – 4 PLANS AND SPECIFICATIONS
The Work to be done is shown in a set of Plans and Specifications entitled:
PROJECT NO. FE20-07
SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1
Said Plans and Specifications and any revision, amendments and addenda thereto are attached
hereto and incorporated herein as part of this Contract and referred to by reference.
SECTION – 5 TIME OF COMMENCEMENT AND COMPLETION
CONTRACTOR agrees to commence the Project within 15 calendar days from the date set forth
in the “Notice to Proceed” sent by OC SAN, unless otherwise specified therein and shall
diligently prosecute the Work to completion within one hundred eighty (180) calendar days from
the date of the “Notice to Proceed” issued by OC SAN, excluding delays caused or authorized
by OC SAN as set forth in Sections 7, 8, and 9 hereof, and applicable provisions in the General
Conditions. The time for completion includes ten (10) calendar days determined by OC SAN
likely to be inclement weather when CONTRACTOR will be unable to work.
SECTION – 6 TIME IS OF THE ESSENCE
Time is of the essence of this Contract. As required by the Contract Documents,
CONTRACTOR shall prepare and obtain approval of all shop drawings, details and samples,
and do all other things necessary and incidental to the prosecution of CONTRACTOR’s Work in
conformance with an approved construction progress schedule. CONTRACTOR shall
coordinate the Work covered by this Contract with that of all other contractors, subcontractors
and of OC SAN, in a manner that will facilitate the efficient completion of the entire Work and
accomplish the required milestone(s), if any, by the applicable deadline(s) in accordance with
Section 5 herein. OC SAN shall have the right to assert complete control of the premises on
which the Work is to be performed and shall have the right to decide the time or order in which
the various portions of the Work shall be installed or the priority of the work of subcontractors,
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 6 of 25
and, in general, all matters representing the timely and orderly conduct of the Work of
CONTRACTOR on the premises.
SECTION – 7 EXCUSABLE DELAYS
CONTRACTOR shall only be excused for any delay in the prosecution or completion of the
Project as specifically provided in General Conditions, “Extension of Time for Delay”, and the
General Requirements, “By CONTRACTOR or Others – Unknown Utilities during Contract
Work”. Extensions of time and extra compensation arising from such excusable delays will be
determined in accordance with the General Conditions, “Extension of Time for Delay” and
“Contract Price Adjustments and Payments”, and extensions of time and extra compensation as
a result of incurring undisclosed utilities will be determined in accordance with General
Requirements, “By CONTRACTOR or Others – Unknown Utilities during Contract Work”.
OC SAN’s decision will be conclusive on all parties to this Contract.
SECTION – 8 EXTRA WORK
The Contract Price as set forth in Section 11, includes compensation for all Work performed by
CONTRACTOR, unless CONTRACTOR obtains a Change Order signed by a designated
representative of OC SAN specifying the exact nature of the Extra Work and the amount of
extra compensation to be paid all as more particularly set forth in Section 9 hereof and the
General Conditions, “Request for Change (Changes at CONTRACTOR’s Request)”, “OWNER
Initiated Changes”, and “Contract Price Adjustments and Payments”.
In the event a Change Order is issued by OC SAN pursuant to the Contract Documents,
OC SAN shall extend the time fixed in Section 5 for completion of the Project by the number of
days, if any, reasonably required for CONTRACTOR to perform the Extra Work, as determined
by OC SAN’s ENGINEER. The decision of the ENGINEER shall be final.
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 7 of 25
SECTION – 9 CHANGES IN PROJECT
OC SAN may at any time, without notice to any Surety, by Change Order, make any changes in
the Work within the general scope of the Contract Document, including but not limited to
changes:
1. In the Specifications (including Drawings and designs);
2. In the time, method or manner of performance of the Work;
3. In OC SAN-furnished facilities, equipment, materials, services or site; or
4. Directing acceleration in the performance of the Work.
No change of period of performance or Contract Price, or any other change in the Contract
Documents, shall be binding until the Contract is modified by a fully executed Change Order.
All Change Orders shall be issued in accordance with the requirements set forth in the General
Conditions, “Request for Change (Changes at CONTRACTOR’s Request)” and “OWNER
Initiated Changes”.
SECTION – 10 LIQUIDATED DAMAGES FOR DELAY
Liquidated Damages shall be payable in the amounts and upon the occurrence of such events
or failure to meet such requirements or deadlines as provided in the Special Provisions,
“Liquidated Damages and Incentives.”
SECTION – 11 CONTRACT PRICE AND METHOD OF PAYMENT
A. OC SAN agrees to pay and the CONTRACTOR agrees to accept as full consideration for
the faithful performance of this Contract, subject to any additions or deductions as
provided in approved Change Orders, the sum of Three Hundred Ninety Five Thousand
Eighty-Two Dollars ($395,082) as itemized on the Attached Exhibit “A”.
Upon satisfaction of the conditions precedent to payment set forth in the General
Requirements, Additional General Requirements and General Conditions (including but
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 8 of 25
not limited to Sections entitled “Mobilization Payment Requirements” and “Payment
Itemized Breakdown of Contract Lump Sum Prices”), there shall be paid to the
CONTRACTOR an initial Net Progress Payment for mobilization. OC SAN shall issue at
the commencement of the job a schedule which shows:
1. A minimum of one payment to be made to the CONTRACTOR for each successive
four (4) week period as the Work progresses, and
2. The due dates for the CONTRACTOR to submit requests for payment to meet the
payment schedule.
After the initial Net Progress Payment, and provided the CONTRACTOR submits the
request for payment prior to the end of the day required to meet the payment schedule,
the CONTRACTOR shall be paid a Net Progress Payment on the corresponding monthly
payment date set forth in the schedule.
Payments shall be made on demands drawn in the manner required by law, accompanied
by a certificate signed by the ENGINEER, stating that the Work for which payment is
demanded has been performed in accordance with the terms of the Contract Documents,
and that the amount stated in the certificate is due under the terms of the Contract.
Payment applications shall also be accompanied with all documentation, records, and
releases as required by the Contract, Exhibit A, Schedule of Prices, and General
Conditions, “Payment for Work – General”. The Total amount of Progress Payments shall
not exceed the actual value of the Work completed as certified by OC SAN’s ENGINEER.
The processing of payments shall not be considered as an acceptance of any part of the
Work.
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 9 of 25
B. As used in this Section, the following defined terms shall have the following meanings:
1. “Net Progress Payment” means a sum equal to the Progress Payment less the
Retention Amount and other qualified deductions (Liquidated Damages, stop
payment notices, etc.).
2. “Progress Payment” means a sum equal to:
a. the value of the actual Work completed since the commencement of the Work
as determined by OC SAN;
b. plus the value of material suitably stored at the worksite, treatment plant or
approved storage yards subject to or under the control of OC SAN since the
commencement of the Work as determined by OC SAN;
c. less all previous Net Progress Payments;
d. less all amounts of previously qualified deductions;
e. less all amounts previously retained as Retention Amounts.
3. “Retention Amount” for each Progress Payment means the percentage of each
Progress Payment to be retained by OC SAN to assure satisfactory completion of
the Contract. The amount to be retained from each Progress Payment shall be
determined as provided in the General Conditions –“Retained Funds; Substitution of
Securities.”
SECTION – 12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF FUNDS
Pursuant to Public Contract Code Section 22300 et seq., the CONTRACTOR may, at its sole
expense, substitute securities as provided in General Conditions – “Retained Funds;
Substitution of Securities.”
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 10 of 25
SECTION – 13 COMPLETION
Final Completion and Final Acceptance shall occur at the time and in the manner specified in the
General Conditions, “Final Acceptance and Final Completion”, “Final Payment” and Exhibit A -
Schedule of Prices.
Upon receipt of all documentation, records, and releases as required by the Contract from the
CONTRACTOR, OC SAN shall proceed with the Final Acceptance as specified in General
Conditions.
SECTION – 14 CONTRACTOR’S EMPLOYEES COMPENSATION
A. Davis-Bacon Act:
CONTRACTOR will pay and will require all Subcontractors to pay all employees on said
Project a salary or wage at least equal to the prevailing rate of per diem wages as
determined by the Secretary of Labor in accordance with the Davis-Bacon Act for each
craft or type of worker needed to perform the Contract. The provisions of the Davis-Bacon
Act shall apply only if the Contract is in excess of Two Thousand Dollars ($2,000.00) and
when twenty-five percent (25%) or more of the Contract is funded by federal assistance. If
the aforesaid conditions are met, a copy of the provisions of the Davis-Bacon Act to be
complied with are incorporated herein as a part of this Contract and referred to by
reference.
B. General Prevailing Rate:
OC SAN has been advised by the State of California Director of Industrial Relations of its
determination of the general prevailing rate of per diem wages and the general prevailing
rate for legal holiday and overtime Work in the locality in which the Work is to be
performed for each craft or type of Work needed to execute this Contract, and copies of
the same are on file in the Office of the ENGINEER of OC SAN. The CONTRACTOR
agrees that not less than said prevailing rates shall be paid to workers employed on this
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 11 of 25
public works Contract as required by Labor Code Section 1774 of the State of California.
Per California Labor Code 1773.2, OC SAN will have on file copies of the prevailing rate of
per diem wages at its principal office and at each job site, which shall be made available to
any interested party upon request.
C. Forfeiture for Violation:
CONTRACTOR shall, as a penalty to OC SAN, forfeit Two Hundred Dollars ($200.00) for
each calendar day or portion thereof for each worker paid (either by the CONTRACTOR or
any Subcontractor under it) less than the prevailing rate of per diem wages as set by the
Director of Industrial Relations, in accordance with Sections 1770-1780 of the California
Labor Code for the Work provided for in this Contract, all in accordance with Section 1775
of the Labor Code of the State of California.
D. Apprentices:
Sections 1777.5, 1777.6, 1777.7 of the Labor Code of the State of California, regarding
the employment of apprentices are applicable to this Contract and the CONTRACTOR
shall comply therewith if the prime contract involves Thirty Thousand Dollars ($30,000.00)
or more.
E. Workday:
In the performance of this Contract, not more than eight (8) hours shall constitute a day’s
work, and the CONTRACTOR shall not require more than eight (8) hours of labor in a day
from any person employed by him hereunder except as provided in paragraph (B) above.
CONTRACTOR shall conform to Article 3, Chapter 1, Part 7 (Section 1810 et seq.) of the
Labor Code of the State of California and shall forfeit to OC SAN as a penalty, the sum of
Twenty-five Dollars ($25.00) for each worker employed in the execution of this Contract by
CONTRACTOR or any Subcontractor for each calendar day during which any worker is
required or permitted to labor more than eight (8) hours in any one calendar day and forty
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 12 of 25
(40) hours in any one week in violation of said Article. CONTRACTOR shall keep an
accurate record showing the name and actual hours worked each calendar day and each
calendar week by each worker employed by CONTRACTOR in connection with the
Project.
F. Registration; Record of Wages; Inspection:
CONTRACTOR shall comply with the registration requirements of Labor Code Section 1725.5.
Pursuant to Labor Code Section 1771.4, the Work is subject to compliance monitoring by the
California Department of Industrial Relations. CONTRACTOR shall maintain accurate payroll
records and shall submit payroll records to the Labor Commissioner pursuant to Labor Code
Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may
be deducted from progress payments per Section 1776.
CONTRACTOR shall comply with the job site notices posting requirements established by
the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e).
SECTION – 15 SURETY BONDS
CONTRACTOR shall, before entering upon the performance of this Contract, furnish Bonds
approved by OC SAN’s General Counsel – one in the amount of one hundred percent (100%) of
the Contract amount, to guarantee the faithful performance of the Work, and the other in the
amount of one hundred percent (100%) of the Contract amount to guarantee payment of all
claims for labor and materials furnished. As changes to the Contract occur via approved
Change Orders, the CONTRACTOR shall assure that the amounts of the Bonds are adjusted to
maintain 100% of the Contract Price. This Contract shall not become effective until such Bonds
are supplied to and approved by OC SAN. Bonds must be issued by a Surety authorized by the
State Insurance Commissioner to do business in California. The Performance Bond shall
remain in full force and effect through the warranty period, as specified in Section 19 below. All
Bonds required to be submitted relating to this Contract must comply with California Code of
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 13 of 25
Civil Procedure Section 995.630. Each Bond shall be executed in the name of the Surety
insurer under penalty of perjury, or the fact of execution of each Bond shall be duly
acknowledged before an officer authorized to take and certify acknowledgments, and either one
of the following conditions shall be satisfied:
A. A copy of the transcript or record of the unrevoked appointment, power of attorney, by-
laws, or other instrument, duly certified by the proper authority and attested by the seal of
the insurer entitling or authorizing the person who executed the Bond to do so for and on
behalf of the insurer, is on file in the Office of the County Clerk of the County of Orange; or
B. A copy of a valid power of attorney is attached to the Bond.
SECTION – 16 INSURANCE
CONTRACTOR shall purchase and maintain, for the duration of the Contract, insurance against
claims for injuries to persons, or damages to property which may arise from or in connection
with the performance of the Work hereunder, and the results of that Work by CONTRACTOR,
its agents, representatives, employees, or Subcontractors, in amounts equal to the
requirements set forth below. CONTRACTOR shall not commence Work under this Contract
until all insurance required under this Section is obtained in a form acceptable to OC SAN, nor
shall CONTRACTOR allow any Subcontractor to commence Work on a subcontract until all
insurance required of the Subcontractor has been obtained. CONTRACTOR shall maintain all
of the foregoing insurance coverages in force through the point at which the Work under this
Contract is fully completed and accepted by OC SAN pursuant to the provisions of the General
Conditions, “Final Acceptance and Final Completion”. Furthermore, CONTRACTOR shall
maintain all of the foregoing insurance coverages in full force and effect throughout the warranty
period, commencing on the date of Final Acceptance. The requirement for carrying the
foregoing insurance shall not derogate from the provisions for indemnification of OC SAN by
CONTRACTOR under Section 17 of this Contract. Notwithstanding nor diminishing the
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 14 of 25
obligations of CONTRACTOR with respect to the foregoing, CONTRACTOR shall subscribe for
and maintain in full force and effect during the life of this Contract, inclusive of all changes to the
Contract Documents made in accordance with the provisions of the General Conditions,
“Request for Change (Changes at CONTRACTOR’s Request)” and/or “OWNER Initiated
Changes”, the following insurance in amounts not less than the amounts specified. OC SAN
reserves the right to amend the required limits of insurance commensurate with the
CONTRACTOR’s risk at any time during the course of the Project. No vehicles may enter
OC SAN premises/worksite without possessing the required insurance coverage.
CONTRACTOR’s insurance shall also comply with all insurance requirements prescribed by
agencies from whom permits shall be obtained for the Work and any other third parties from
whom third party agreements are necessary to perform the Work (collectively, the “Third
Parties”), The Special Provisions may list such requirements and sample forms and
requirements from such Third Parties may be included in an attachment to the General
Requirements. CONTRACTOR bears the responsibility to discover and comply with all
requirements of Third Parties, including meeting specific insurance requirements, that are
necessary for the complete performance of the Work. To the extent there is a conflict between
the Third Parties’ insurance requirements and those set forth by OC SAN herein, the
requirement(s) providing the more protective coverage for both OC SAN and the Third Parties
shall control and be purchased and maintained by CONTRACTOR.
If CONTRACTOR maintains higher limits than the minimums shown in this Section, OC SAN
requires and shall be entitled to coverage for the higher limits maintained by the
CONTRACTOR.
Where permitted by law, CONTRACTOR hereby waives all rights of recovery by subrogation
because of deductible clauses, inadequacy of limits of any insurance policy, limitations or
exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 15 of 25
employees, and any other contractor or subcontractor performing Work or rendering services on
behalf of OC SAN in connection with the planning, development and construction of the Project.
In all its insurance coverages (except for Professional Liability/Errors and Omissions coverages,
if applicable) related to the Work, CONTRACTOR shall include clauses providing that each
insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their
officers, agents, or employees, or any other contractor or subcontractor performing Work or
rendering services at the Project. Where permitted by law, CONTRACTOR shall require similar
written express waivers and insurance clauses from each of its Subcontractors of every tier. A
waiver of subrogation shall be effective as to any individual or entity, even if such individual or
entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not
pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity
has an insurable interest in the property damaged.
A. Limits of Insurance
1. General Liability: Two Million Dollars ($2,000,000) per occurrence and a general
aggregate limit of Four Million Dollars ($4,000,000) for bodily injury, personal injury
and property damage. If aggregate limits apply separately to this contract (as
evidenced by submission of ISO form CG 25 03 or CG 25 04), then the aggregate
limit may be equivalent to the per occurrence limit. Coverage shall include each of
the following:
a. Premises-Operations.
b. Products and Completed Operations, with limits of at least Two Million Dollars
($2,000,000) per occurrence and a general aggregate limit of Four Million
Dollars ($4,000,000) which shall be in effect at all times during the warranty
period set forth in the Warranty section herein, and as set forth in the General
Conditions, “Warranty (CONTRACTOR’s Guarantee)”, plus any additional
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 16 of 25
extension or continuation of time to said warranty period that may be required
or authorized by said provisions. If aggregate limits apply separately to this
contract (as evidenced by submission of ISO form CG 25 03 or CG 25 04),
then the aggregate limit may be equivalent to the per occurrence limit.
c. Broad Form Property Damage, expressly including damage arising out of
explosion, collapse, or underground damage.
d. Contractual Liability, expressly including the indemnity provisions assumed
under this Contract.
e. Separation of Insured Clause, providing that coverage applies separately to
each insured, except with respect to the limits of liability.
f. Independent CONTRACTOR’s Liability.
To the extent first dollar coverage, including defense of any claim, is not
available to OC SAN or any other additional insured because of any SIR,
deductible, or any other form of self insurance, CONTRACTOR is obligated to
assume responsibility of insurer until the deductible, SIR or other condition of
insurer assuming its defense and/or indemnity has been satisfied.
CONTRACTOR shall be responsible to pay any deductible or SIR.
g. If a crane will be used, the general liability insurance will be endorsed to add
Riggers Liability coverage or its equivalent to cover the usage of the crane and
exposures with regard to the crane operators, riggers and others involved in
using the crane.
h. If divers will be used, the general liability insurance will be endorsed to cover
marine liability or its equivalent to cover the usage of divers.
2. Automobile Liability: The CONTRACTOR shall maintain a policy of automobile
liability insurance on a comprehensive form covering all owned, non-owned, and
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 17 of 25
hired automobiles, trucks, and other vehicles providing the following minimum limit of
liability coverage: combined single limit of One Million Dollars ($1,000,000) for bodily
injury, personal injury, and property damage.
3. Umbrella Excess Liability: The minimum limits of general liability and automobile
liability insurance required, as set forth above, shall be provided for either in a single
policy of primary insurance or a combination of policies of primary and umbrella
excess coverage. Excess liability coverage shall be issued with limits of liability
which, when combined with the primary insurance, will equal the minimum limits for
general liability and automobile liability.
4. Drone Liability Insurance: If a drone will be used, drone liability insurance must be
maintained by CONTRACTOR in the amount of One Million Dollars ($1,000,000) in a
form acceptable to OC SAN.
5. Workers’ Compensation/Employer’s Liability: CONTRACTOR shall provide such
workers’ compensation insurance as required by the Labor Code of the State of
California, including employer’s liability with a minimum limit of One Million Dollars
($1,000,000) per accident for bodily injury or disease. If an exposure to Jones Act
liability may exist, the insurance required herein shall include coverage with regard to
Jones Act claims.
B. Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by OC SAN.
At the option of OC SAN, either: the Insurer shall reduce or eliminate such deductibles or
self-insured retentions as respects OC SAN, its Directors, officers, agents, consultants,
and employees; or CONTRACTOR shall provide a financial guarantee satisfactory to OC
SAN guaranteeing payment of losses and related investigations, claim administration, and
defense expenses.
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 18 of 25
C. Other Insurance Provisions
1. Each such policy of general liability insurance and automobile liability insurance shall
be endorsed to contain, the following provisions:
a. OC SAN, its directors, officers, agents, consultants, and employees, and all
public agencies from whom permits will be obtained, and their directors,
officers, agents, and employees are hereby declared to be additional insureds
under the terms of this policy, but only with respect to the operations of
CONTRACTOR at or from any of the sites of OC SAN in connection with this
Contract, or acts and omissions of the additional insured in connection with its
general supervision or inspection of said operations related to this Contract.
b. Insurance afforded by the additional insured endorsement shall apply as
primary insurance, and other insurance maintained by OC SAN shall be excess
only and not contributing with insurance provided under this policy.
2. Cancellation and Policy Change Notice.
The CONTRACTOR is required to notify OC SAN in writing of any insurance
cancellation notice it receives or other knowledge of pending or actual insurance
policy cancellation within two (2) working days of receipt of such notice or acquisition
of such knowledge. Additionally, the CONTRACTOR is required to notify OC SAN in
writing of any change in the terms of insurance, including reduction in coverage or
increase in deductible/SIR, within two (2) working days of receipt of such notice or
knowledge of same.
Said notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT 10844 Ellis Avenue Fountain Valley, CA 92708 Attention: Contracts, Purchasing & Materials Management Division
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 19 of 25
3. Coverage shall not extend to any indemnity coverage for the active negligence of
any additional insured in any case where an agreement to indemnify the additional
insured would be invalid under California Civil Code Section 2782(b).
4. If required by a public agency from whom permit(s) will be obtained, each policy of
general liability insurance and automobile liability insurance shall be endorsed to
specify by name the public agency and its legislative members, officers, agents,
consultants, and employees, to be additional insureds.
D. Acceptability of Insurers
Insurers must have an “A-“, or better, Policyholder’s Rating, and a Financial Rating of at
least Class VIII, or better, in accordance with the most current A.M. Best Rating Guide.
OC SAN recognizes that State Compensation Insurance Fund has withdrawn from
participation in the A.M. Best Rating Guide process. Nevertheless, OC SAN will accept
State Compensation Insurance Fund for the required policy of worker’s compensation
insurance, subject to OC SAN’s option, at any time during the term of this Contract, to
require a change in insurer upon twenty (20) days written notice. Further, OC SAN will
require CONTRACTOR to substitute any insurer whose rating drops below the levels
herein specified. Said substitution shall occur within twenty (20) days of written notice to
CONTRACTOR by OC SAN or its agent.
E. Verification of Coverage
CONTRACTOR shall furnish OC SAN with original certificates and mandatory
endorsements affecting coverage. Said policies and endorsements shall conform to the
requirements herein stated. All certificates and endorsements are to be received and
approved by OC SAN before Work commences. OC SAN reserves the right to require
complete, certified copies of all required insurance policies, including endorsements,
affecting the coverage required by these Specifications at any time.
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 20 of 25
F. Subcontractors
CONTRACTOR shall be responsible to establish insurance requirements for any
Subcontractors hired by CONTRACTOR. The insurance shall be in amounts and types
reasonably sufficient to deal with the risk of loss involving the Subcontractor’s operations
and work. OC SAN and any public agency issuing permits for the Project must be named
as “Additional Insured” on any general liability or automobile liability policy obtained by a
Subcontractor. The CONTRACTOR must obtain copies and maintain current versions of
all Subcontractors’ policies, certificate of liability and mandatory endorsements effecting
coverage. Upon request, CONTRACTOR must furnish OC SAN with the above
referenced required documents.
G. Required Forms and Endorsements
1. Required ACORD Form
a. Certificate of Liability ACORD Form 25 or other equivalent
certificate of insurance form
2. Required Insurance Services Office, Inc. Endorsements (when alternative forms are
shown, they are Iisted in order of preference)
In the event any of the following forms are cancelled by Insurance Services Office,
Inc. (ISO), or are updated, the ISO replacement form or equivalent must be supplied.
a. Commercial General Liability Form CG 00 01
b. Additional Insured Including Form CG 20 10 and Products-Completed Operations Form CG 20 37
All other additional insured endorsements must be submitted for approval by OC SAN, and OC SAN
may reject alternatives that provide different or less coverage to OC SAN. c. Waiver of Transfer of Rights of Form CG 24 04 Recovery Against Others to Us/ Waiver of Subrogation
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 21 of 25
3. Required State Compensation Insurance Fund Endorsements
a. Waiver of Subrogation Submit workers’ compensation waiver of subrogation endorsement provided by carrier for OC SAN
approval. b. Cancellation Notice No endorsement is required. However, CONTRACTOR is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article C.2., Cancellation and Policy Change Notice, above. 4. Additional Required Endorsements
a. Notice of Policy Termination Manuscript Endorsement
SECTION – 17 RISK AND INDEMNIFICATION
All Work covered by this Contract done at the site of construction or in preparing or delivering
materials to the site shall be at the risk of CONTRACTOR alone. CONTRACTOR shall save,
indemnify, defend, and keep OC SAN and others harmless as more specifically set forth in
General Conditions, “General Indemnification”.
SECTION – 18 TERMINATION
This Contract may be terminated in whole or in part in writing by OC SAN in the event of
substantial failure by the CONTRACTOR to fulfill its obligations under this Agreement, or it may
be terminated by OC SAN for its convenience provided that such termination is effectuated in a
manner and upon such conditions set forth more particularly in General Conditions,
“Termination for Default” and/or “Termination for Convenience”, provided that no termination
may be effected unless proper notice is provided to CONTRACTOR at the time and in the
manner provided in said General Conditions. If termination for default or convenience is
effected by OC SAN, an equitable adjustment in the price provided for in this Contract shall be
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 22 of 25
made at the time and in the manner provided in the General Conditions, “Termination for
Default” and “Termination for Convenience”.
SECTION – 19 WARRANTY
The CONTRACTOR agrees to perform all Work under this Contract in accordance with the
Contract Documents, including OC SAN’s designs, Drawings and Specifications.
The CONTRACTOR guarantees for a period of at least one (1) year from the date of Final
Acceptance of the Work, pursuant to the General Conditions, “Final Acceptance and Final
Completion” that the completed Work is free from all defects due to faulty materials, equipment
or workmanship and that it shall promptly make whatever adjustments or corrections which may
be necessary to cure any defects, including repairs of any damage to other parts of the system
resulting from such defects. OC SAN shall promptly give notice to the CONTRACTOR of
observed defects. In the event that the CONTRACTOR fails to make adjustments, repairs,
corrections or other work made necessary by such defects, OC SAN may do so and charge the
CONTRACTOR the cost incurred. The CONTRACTOR’s warranty shall continue as to any
corrected deficiency until the later of (1) the remainder of the original one-year warranty period;
or (2) one year after acceptance by OC SAN of the corrected Work. The Performance Bond
and the Payment Bond shall remain in full force and effect through the guarantee period.
The CONTRACTOR’s obligations under this clause are in addition to the CONTRACTOR’s
other express or implied assurances under this Contract, including but not limited to specific
manufacturer or other extended warranties specified in the Plans and Specifications, or state
law and in no way diminish any other rights that OC SAN may have against the CONTRACTOR
for faulty materials, equipment or Work.
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 23 of 25
SECTION – 20 ASSIGNMENT
No assignment by the CONTRACTOR of this Contract or any part hereof, or of funds to be
received hereunder, will be recognized by OC SAN unless such assignment has had prior
written approval and consent of OC SAN and the Surety.
SECTION – 21 RESOLUTION OF DISPUTES
OC SAN and the CONTRACTOR shall comply with the provisions of California Public Contract
Code Section 20104 et. seq., regarding resolution of construction claims for any Claims which
arise between the CONTRACTOR and OC SAN, as well as all applicable dispute and Claims
provisions as set forth in the General Conditions and as otherwise required by law.
SECTION – 22 SAFETY & HEALTH
CONTRACTOR shall comply with all applicable safety and health requirements mandated by
federal, state, city and/or public agency codes, permits, ordinances, regulations, and laws, as
well as these Contract Documents, including but not limited to the General Requirements,
Section entitled “Safety” and Exhibit B Contractor Safety Standards.
SECTION – 23 NOTICES
Any notice required or permitted under this Contract shall be sent by certified mail, return receipt
requested, at the address set forth below. Any party whose address changes shall notify the
other party in writing.
TO OC SAN: Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, California 92708-7018
Attn: Clerk of the Board
Copy to: Orange County Sanitation District 10844 Ellis Avenue
Fountain Valley, California 92708-7018 Attn: Construction Manager
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 24 of 25
Bradley R. Hogin, Esquire Woodruff, Spradlin & Smart
555 Anton Boulevard Suite 1200 Costa Mesa, California 92626
TO CONTRACTOR: Sancon Technologies, Inc. 5841 Engineer Drive Huntington Beach, CA 92649
Copy to: Chuck Parsons, President Sancon Technologies, Inc. 5841 Engineer Drive Huntington Beach, CA 92649
C-CA-102621 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 25 of 25
IN WITNESS WHEREOF, the parties hereto have executed this Contract Agreement as the
date first hereinabove written.
CONTRACTOR: Sancon Technologies, Inc.
5841 Engineer Drive
Huntington Beach, CA 92649
By______________________________ Date _________________
______________________________ Printed Name
Its______________________________
CONTRACTOR’s State License No. 774055 (Expiration Date 01/31/2024)
OC SAN: Orange County Sanitation District
By______________________________ Date _________________ John B. Withers Board Chairman
By______________________________ Date _________________ Kelly A. Lore Clerk of the Board
By______________________________ Date _________________
Ruth Zintzun Purchasing & Contracts Manager
C-EXA-062221
EXHIBIT A SCHEDULE OF PRICES
C-EXA-062221
TABLE OF CONTENTS
EXHIBIT A SCHEDULE OF PRICES
EXA-1 BASIS OF COMPENSATION ........................................................................... 1
EXA-2 PROGRESS PAYMENTS ................................................................................. 1
EXA-3 RETENTION AND ESCROW ACCOUNTS ....................................................... 1
EXA-4 STOP PAYMENT NOTICE ............................................................................... 3
EXA-5 PAYMENT TO SUBCONTRACTORS ............................................................... 3
EXA-6 PAYMENT OF TAXES ...................................................................................... 3
EXA-7 FINAL PAYMENT ............................................................................................. 4
EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT.... 5
ATTACHMENT 1 – CERTIFICATION FOR REQUEST FOR PAYMENT ......................... 7
ATTACHMENT 2 – SCHEDULE OF PRICES .................................................................. 8
C-EXA-062221 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 1 of 8
EXHIBIT A
SCHEDULE OF PRICES
EXA-1 BASIS OF COMPENSATION
CONTRACTOR will be paid the Contract Price according to the Schedule of Prices, and all other applicable terms and conditions of the Contract
Documents. EXA-2 PROGRESS PAYMENTS
Progress payments will be made in accordance with all applicable terms and conditions of the Contract Documents, including, but not limited to:
1. Contract Agreement – Section 11 – “Contract Price and Method of Payment;”
2. General Conditions – “Payment – General”;
3. General Conditions – “Payment – Applications for Payment”;
4. General Conditions – “Payment – Mobilization Payment Requirements;”
5. General Conditions – “Payment – Itemized Breakdown of Contract Lump Sum Prices”;
6. General Conditions – "Contract Price Adjustments and Payments”;
7. General Conditions – “Suspension of Payments”;
8. General Conditions – “OC SAN’s Right to Withhold Certain Amounts and
Make Application Thereof”; and
9. General Conditions – “Final Payment.”
EXA-3 RETENTION AND ESCROW ACCOUNTS
A. Retention:
OC SAN shall retain a percentage of each progress payment to assure satisfactory completion of the Work. The amount to be retained from each progress payment shall be determined as provided in General Conditions – “Retained Funds; Substitution of Securities”. In all contracts between CONTRACTOR and its Subcontractors and/or Suppliers, the retention may not exceed the percentage specified in the Contract Documents.
C-EXA-062221 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 2 of 8
B. Substitution of Securities:
CONTRACTOR may, at its sole expense, substitute securities as provided in
General Conditions – “Retained Funds; Substitution of Securities.” Payment of Escrow Agent:
In lieu of substitution of securities as provided above, the CONTRACTOR may request and OC SAN shall make payment of retention earned directly to the escrow agent at the expense of the CONTRACTOR. At the expense of the CONTRACTOR, the CONTRACTOR may direct the investment of the payments into securities consistent with Government Code §16430 and the CONTRACTOR shall receive the interest earned on the investments upon the same terms provided for in this article for securities deposited by the CONTRACTOR. Upon satisfactory completion of the Contract, the CONTRACTOR shall receive from the escrow agent all securities, interest and payments received by the escrow agent from OC SAN, pursuant to the terms of this article. The CONTRACTOR shall pay to each Subcontractor, not later than
twenty (20) calendar days after receipt of the payment, the respective amount of interest earned, net of costs attributed to retention withheld from each Subcontractor, on the amount of retention withheld to ensure the performance
of the Subcontractor. The escrow agreement used by the escrow agent pursuant to this article shall be substantially similar to the form set forth in §22300 of the California Public Contract Code.
C. Release of Retention:
Upon Final Acceptance of the Work, the CONTRACTOR shall submit an invoice for release of retention in accordance with the terms of the Contract. D. Additional Deductibles:
In addition to the retentions described above, OC SAN may deduct from each progress payment any or all of the following: 1. Liquidated Damages that have occurred as of the date of the application for progress payment;
2. Deductions from previous progress payments already paid, due to OC SAN’s discovery of deficiencies in the Work or non-compliance with the Specifications or any other requirement of the Contract;
3. Sums expended by OC SAN in performing any of the CONTRACTOR’S obligations under the Contract that the CONTRACTOR has failed to perform, and;
4. Other sums that OC SAN is entitled to recover from the CONTRACTOR under the terms of the Contract, including without limitation insurance deductibles and assessments.
C-EXA-062221 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 3 of 8
The failure of OC SAN to deduct any of the above-identified sums from a progress payment shall not constitute a waiver of OC SAN’s right to such sums
or to deduct them from a later progress payment. EXA-4 STOP PAYMENT NOTICE
In addition to other amounts properly withheld under this article or under other provisions of the Contract, OC SAN shall retain from progress payments otherwise due the CONTRACTOR an amount equal to one hundred twenty-five percent (125%) of the amount claimed under any stop payment notice under Civil Code §9350 et. seq. or other lien filed against the CONTRACTOR for labor, materials, supplies, equipment, and any other thing of value claimed to have been furnished to and/or incorporated into the Work; or for any other alleged contribution thereto. In addition to the foregoing and in accordance with Civil Code §9358 OC SAN may also satisfy its duty to withhold funds for stop payment notices by refusing to release funds held in escrow pursuant to public receipt of a release of stop payment notice executed by a stop payment notice
claimant, a stop payment notice release bond, an order of a court of competent jurisdiction, or other evidence satisfactory to OC SAN that the CONTRACTOR has resolved such claim by settlement.
EXA-5 PAYMENT TO SUBCONTRACTORS
Requirements
1. The CONTRACTOR shall pay all Subcontractors for and on account of
Work performed by such Subcontractors, not later than seven (7) days after receipt of each progress payment as required by the California Business and Professions Code §7108.5. Such payments to Subcontractors shall be
based on the measurements and estimates made pursuant to article progress payments provided herein.
2. Except as specifically provided by law, the CONTRACTOR shall pay all Subcontractors any and all retention due and owing for and on account of Work performed by such Subcontractors not later than seven (7) days after CONTRACTOR’S receipt of said retention proceeds from OC SAN as required by the California Public Contract Code §7107.
EXA-6 PAYMENT OF TAXES
Unless otherwise specifically provided in this Contract, the Contract Price includes full compensation to the CONTRACTOR for all taxes. The CONTRACTOR shall pay all federal, state, and local taxes, and duties applicable to and assessable against any Work, including but not limited to retail sales and use, transportation, export, import, business, and special taxes. The CONTRACTOR shall ascertain and pay the taxes when due. The
CONTRACTOR will maintain auditable records, subject to OC SAN reviews, confirming that tax payments are current at all times.
C-EXA-062221 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 4 of 8
EXA-7 FINAL PAYMENT
After Final Acceptance of the Work, as more particularly set forth in the
General Conditions, “Final Acceptance and Final Completion”, and after Resolution of the Board authorizing final payment and satisfaction of the requirements as more particularly set forth in General Conditions – “Final
Payment”, a final payment will be made as follows: 1. Prior to Final Acceptance, the CONTRACTOR shall prepare and submit an application for Final Payment to OC SAN, including:
a. The proposed total amount due the CONTRACTOR, segregated by items on the payment schedule, amendments, Change Orders, and other bases for payment;
b. Deductions for prior progress payments;
c. Amounts retained;
d. A conditional waiver and release on final payment for each Subcontractor (per Civil Code Section 8136);
e. A conditional waiver and release on final payment on behalf of the CONTRACTOR (per Civil Code Section 8136);
f. List of Claims the CONTRACTOR intends to file at that time or a
statement that no Claims will be filed,
g. List of pending unsettled claims, stating claimed amounts, and copies of any and all complaints and/or demands for arbitration received by the
CONTRACTOR; and
h. For each and every claim that resulted in litigation or arbitration which the CONTRACTOR has settled, a conformed copy of the Request for
Dismissal with prejudice or other satisfactory evidence the arbitration is resolved.
2. The application for Final Payment shall include complete and legally effective releases or waivers of liens and stop payment notices satisfactory to OC SAN, arising out of or filed in connection with the Work. Prior progress payments shall be subject to correction in OC SAN’s review of the application for Final Payment. Claims filed with the application for Final Payment must be otherwise timely under the Contract and applicable law.
3. Within a reasonable time, OC SAN will review the CONTRACTOR’S application for Final Payment. Any recommended changes or corrections will then be forwarded to the CONTRACTOR. Within ten (10) calendar days
after receipt of recommended changes from OC SAN, the CONTRACTOR will make the changes, or list Claims that will be filed as a result of the changes, and shall submit the revised application for Final Payment. Upon
C-EXA-062221 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 5 of 8
acceptance by OC SAN, the revised application for Final Payment will become the approved application for Final Payment.
4. If no Claims have been filed with the initial or any revised application for Final Payment, and no Claims remain unsettled within thirty-five (35) calendar days after Final Acceptance of the Work by OC SAN, and
agreements are reached on all issues regarding the application for Final Payment, OC SAN, in exchange for an executed release, satisfactory in form and substance to OC SAN, will pay the entire sum found due on the approved application for Final Payment, including the amount, if any, allowed on settled Claims.
5. The release from the CONTRACTOR shall be from any and all Claims arising under the Contract, except for Claims that with the concurrence of OC SAN are specifically reserved, and shall release and waive all unreserved Claims against OC SAN and its officers, directors, employees and authorized representatives. The release shall be accompanied by a certification by the CONTRACTOR that:
a. It has resolved all Subcontractors, Suppliers and other Claims that are related to the settled Claims included in the Final Payment;
b. It has no reason to believe that any party has a valid claim against the
CONTRACTOR or OC SAN which has not been communicated in writing by the CONTRACTOR to OC SAN as of the date of the certificate;
c. All warranties are in full force and effect, and;
d. The releases and the warranties shall survive Final Payment.
6. If any claims remain open, OC SAN may make Final Payment subject to
resolution of those claims. OC SAN may withhold from the Final Payment an amount not to exceed one hundred fifty percent (150%) of the sum of the amounts of the open claims, and one hundred twenty-five percent (125%) of the amounts of open stop payment notices referred to in article entitled stop payment notices herein.
7. The CONTRACTOR shall provide an unconditional waiver and release on final payment from each Subcontractor and Supplier providing Work under the Contract (per Civil Code Section 8138) and an unconditional waiver and
release on final payment on behalf of the CONTRACTOR (per Civil Code Section 8138) within thirty (30) days of receipt of Final Payment.
EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT
Notwithstanding OC SAN’s acceptance of the application for Final Payment and irrespective of whether it is before or after Final Payment has been made, OC SAN shall not be precluded from subsequently showing that:
1. The true and correct amount payable for the Work is different from that previously accepted;
C-EXA-062221 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 6 of 8
2. The previously accepted Work did not in fact conform to the Contract requirements, or;
3. A previous payment or portion thereof for Work was improperly made.
OC SAN also shall not be stopped from demanding and recovering damages from the CONTRACTOR, as appropriate, under any of the foregoing
circumstances as permitted under the Contract or applicable law.
C-EXA-062221 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 7 of 8
ATTACHMENT 1 – CERTIFICATION FOR REQUEST FOR PAYMENT
I hereby certify under penalty of perjury as follows: That the claim for payment is in all respects true, correct; that the services mentioned
herein were actually rendered and/or supplies delivered to OC SAN in accordance with the Contract. I understand that it is a violation of both the federal and California False Claims Acts to knowingly present or cause to be presented to OC SAN a false claim for payment or approval. A claim includes a demand or request for money. It is also a violation of the False Claims Acts to knowingly make use of a false record or statement to get a false claim paid. The term "knowingly" includes either actual knowledge of the information, deliberate ignorance of the truth or falsity of the information, or reckless disregard for the
truth or falsity of the information. Proof of specific intent to defraud is not necessary under the False Claims Acts. I understand that the penalties under the Federal False Claims Act and State of California False Claims Act are non-exclusive, and are in
addition to any other remedies which OC SAN may have either under contract or law. I hereby further certify, to the best of my knowledge and belief, that:
1. The amounts requested are only for performance in accordance with the Specifications, terms, and conditions of the Contract;
2. Payments to Subcontractors and Suppliers have been made from previous payments received under the Contract, and timely payments will be made from the proceeds of the payment covered by this certification; 3. This request for progress payments does not include any amounts which the prime CONTRACTOR intends to withhold or retain from a Subcontractor or Supplier in accordance with the terms and conditions of the subcontract; and
4. This certification is not to be construed as Final Acceptance of a Subcontractor’s performance.
_________________________________________
Name
_________________________________________
Title _________________________________________
Date
C-EXA-062221 PROJECT NO. FE20-07 SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1 CONFORMED Page 8 of 8
ATTACHMENT 2 – SCHEDULE OF PRICES
See next pages for Bid Submittal Forms: Sancon Technologies, Inc. BF-14 SCHEDULE OF PRICES, Pages 1 – 2
0 ,_
Bid Submitted By: 2:11tvl•,J ( 6:'.il/\A1lo4 t!'i'S
(Name of Firm)
BF-14 SCHEDULE OF PRICES
A.
INSTRUCTIONS
General
For Unit Prices, ii is understood that the following quantities are approximate only and are
solely for the purpose of estimating the comparison of Bids, and that the actual value of Work
will be computed based upon the actual quantities in the completed Work, whether they be
more or less than those shown. CONTRACTOR's compensation for the Work under the
Contract Documents will be computed based upon the lump sum amount of the Contract at
time of award, plus any additional or deleted costs approved by OC SAN via approved Change
Orders, pursuant to the Contract Documents.
Bidder shall separately price and accurately reflect costs associated with each line item,
leaving no blanks. Any and all modifications to the Bid must be initialed by an authorized
representative of the Bidder in accordance with the Instructions to Bidders, Preparation of Bid.
Bidders are reminded of Instruction to Bidders, Discrepancy In Bid Items, which, in summary,
provides that the total price for each item shall be based on the Unit Price listed for each item
multiplied by the quantity; and the correct Total Price for each item shall be totaled to
determine the Total Amount of Bid.
All applicable costs including overhead and profit shall be reflected in the respective unit costs
and the TOTAL AMOUNT OF BID. The Bid price shall Include all costs to complete the Work,
including profit. overhead, etc., unless otherwise specified in the Contract Documents. All
applicable sales taxes, state and/or federal. and any other special taxes, patent rights or
royalties shall be included In the prices quoted in this Bid.
B. Basis of Award
AWARD OF THE CONTRACT WILL BE MADE ON THE BASIS OF THE LOWEST
RESPONSIVE AND RESPONSIBLE BID.
Note 1: Base Bid. Includes all costs necessary to furnish all labor, materials, equipment and
services for the construction of the Project per the Contract Documents.
BF-14 SCHEDULE OF PRICES C-BF-122821
PROJECT NO. FE20-07
SANTAANA TRUNK REHABILITATION AT PLANT NO. 1
Page 1 of2
Bid Submitted By: s;.,..,,inJ ~c./-lNOW'116-S !we
(Name of Firm)
EXHIBIT A
SCHEDULE OF PRICES
BASE BID ITEMS (Refer to Note 1 in the Instructions):
Item Description Unit of Extended Price
No. Measurement
1. Mobilization, initial progress payment for all
fees, labor, materials and equipment required
for mobilization, staging area, and surety Lump Sum $ 15,000
bonds, and other acitivities in conformance
with the Contract Documents, for a fixed
amount of:
2. Furnish all labor, materials and equipment
necessary for the completion of the Contract -Work, except for the Work specified for Bid Lump Sum $ 1E?Ot~
Item 1, in conformance with the Contract
Documents, for a lump sum price of:
TOTAL AMOUNT OF BID (BASIS OF AWARD)
BF-14 SCHEDULE OF PRICES C-BF-122821
PROJECT NO. FE20-07
SANTA ANA TRUNK REHABILITATION AT PLANT NO. 1
Page 2 of2
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2021-1972 Agenda Date:4/6/2022 Agenda Item No:4.
FROM:James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1, PROJECT NO.
P1-126
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Recommend to the Board of Directors to:
A. Approve a Professional Design Services Agreement with Black & Veatch to provide
engineering services for Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1,
Project No. P1-126, for an amount not to exceed $14,163,000; and
B. Approve a contingency of $1,416,300 (10%).
BACKGROUND
Primary treatment is the second of three liquid treatment steps at Orange County Sanitation District
(OC San) Plant No. 1. Primary treatment reduces wastewater suspended solids using large concrete
basins known as primary clarifiers or primary sedimentation basins.
Plant No. 1 includes two sets of primary clarifiers; a set of 26 rectangular clarifiers and a much older
set of three circular clarifiers constructed in the late 1950s and early 1960s. The rectangular clarifiers
have enough capacity for normal flows, but in the event of peak wet weather flows or when one side
the rectangular basins must be taken out of service for maintenance or condition assessments, the
circular basins are needed.
A concept study was performed in 2017 to assess the condition of the circular clarifiers and related
facilities and to identify recommended improvements. The study recommended replacing rather than
rehabilitating them.
RELEVANT STANDARDS
·Comply with California Government Code §4526: Select the “best qualified firm” and
“negotiate fair and equitable fees”
·Protect OC San assets
·24/7/365 treatment plant reliability
Orange County Sanitation District Printed on 3/29/2022Page 1 of 4
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
File #:2021-1972 Agenda Date:4/6/2022 Agenda Item No:4.
PROBLEM
The circular primary clarifiers at Plant No.1 and many of their associated support facilities including
the primary odor control facility are nearing the end of their useful life.In fact,the circular clarifiers
were taken out of service in 2016 to repair mechanical equipment failures and pipe leaks.The
interim repairs have been performed and the current facilities are available for service until the new
systems are designed and construction of replacements begins.
PROPOSED SOLUTION
Approve a Professional Design Services Agreement for the Primary Sedimentation Basins No.3-5
Replacement at Plant No.1,Project No.P1-126.This project will replace the circular primary
clarifiers and associated support facilities including sludge pump stations,odor control,and effluent
conveyance.The requested professional engineering services are required to design the new
facilities.
TIMING CONCERNS
The existing facilities are near the end of their useful life.The facilities will become increasingly
unreliable as time passes.
RAMIFICATIONS OF NOT TAKING ACTION
If the basins are not available during a large wet weather event it would cause either a sewage spill
upstream or discharging untreated sewage to the ocean.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
Consultant Selection:
OC San requested and advertised for proposals for Primary Sedimentation Basins No.3-5
Replacement at Plant No.1,Project No.P1-126,on October 12,2021.The following evaluation
criteria were described in the Request for Proposals and used to determine the most qualified
Consultant.
CRITERION WEIGHT
Project Understanding and Approach 40%
Related Project Experience 25%
Project Team and Staff Qualifications 35%
Three proposals were received on November 23,2021 and evaluated in accordance with the
evaluation process set forth in OC San’s Purchasing Ordinance by a pre-selected Evaluation Team
consisting of OC San staff:one Project Manager,one Project Engineer,two Engineering
Supervisors,and one Engineering Manager.The Evaluation Team also included one non-votingOrange County Sanitation District Printed on 3/29/2022Page 2 of 4
powered by Legistar™
File #:2021-1972 Agenda Date:4/6/2022 Agenda Item No:4.
Supervisors,and one Engineering Manager.The Evaluation Team also included one non-voting
representative from the Contracts Administration Division.
The Evaluation Team scored the proposal on the established criteria as summarized in the table
below:
Firm Approach (Max 40)Related
Experience
(Max 25)
Team (Max
35)
Total Score
(Max 100)
1 Black & Veatch 34 22 30 86
2 Carollo Engineers, Inc.30 21 27 78
3 HDR Engineering, Inc.29 18 22 69
Based on this scoring,two Consultants were shortlisted for interviews on January 11,2022.
Following the interviews,each member of the Evaluation Team scored the Consultants based on
both the proposals and interviews using the evaluation criteria and weighting described above.
Based on the scoring shown below, Black & Veatch was selected as the most qualified Consultant.
Firm Approach (Max 40)Related
Experience
(Max 25)
Team (Max
35)
Total Score
(Max 100)
1 Black & Veatch 36 22 32 90
2 Carollo Engineers, Inc.30 21 29 80
Black &Veatch went beyond a general understanding of the Scope of Work and provided specific
examples of how the proposed team would efficiently approach unique design challenges of the
project.Additionally,the proposal showed that the firm has the appropriate experience,design team,
and a well-defined project execution plan with the key decisions needed during the Preliminary
Design Phase to start the design with a well-defined scope.
Review of Fee Proposal and Negotiations:
Proposals were accompanied by sealed fee proposals.In accordance with OC San’s Purchasing
Ordinance,the fee proposal of only the highest-ranked firm was opened after approval by the
Director of Engineering of the Evaluation Committee’s recommendation.
Staff conducted negotiations with Black &Veatch to clarify the Scope of Work requirements,
assumptions used for the estimated level of effort,and the proposed approach to meet the goals and
objectives for the project.Although the consultant had a good understanding of the scope,the
proposed fee was higher than expected.Through multiple meetings,staff reached agreement on a
revised level of effort and reduced the fee to an acceptable level.The following table summarizes
how the estimated level of effort was revised through the negotiations process.
Original Fee
Proposal
Negotiated Fee
Total Hours 69,996 70,451
Total Fee $15,404,103 $14,163,000
Orange County Sanitation District Printed on 3/29/2022Page 3 of 4
powered by Legistar™
File #:2021-1972 Agenda Date:4/6/2022 Agenda Item No:4.
Original Fee
Proposal
Negotiated Fee
Total Hours 69,996 70,451
Total Fee $15,404,103 $14,163,000
The Consultant’s fringe and overhead costs,which factor into the billing rate,have been
substantiated.The contract profit is 5%,which is based on an established formula based on OC
San’s standard design agreements.Staff is requesting a 10 percent contingency to address
revisions as the project progress through preliminary and final design.
Based on the above,staff has determined that the final negotiated fee is fair and reasonable for the
level of effort required for this project and recommends award of the Professional Design Services
Agreement to Black & Veatch.
CEQA
This project is exempt from CEQA under the Class 2 categorical exemption set forth in California
Code of Regulations Section 15302.A Notice of Exemption will be filed with the OC Clerk-Recorder
after OC San Board of Directors approval of the Construction Contract.
FINANCIAL CONSIDERATIONS
This request complies with the authority levels of OC San’s Purchasing Ordinance.This item has
been budgeted (Budget Update,Fiscal Year 2021-2022,Appendix A,Page A-9,Primary
Sedimentation Basins No.3-5 Replacement at Plant No.1,Project No.P1-126)and the budget is
sufficient for the recommended action.Although the budget is sufficient for this action,staff plans to
request an increased budget for this project as part of the Fiscal Year 2022-23 and 2023-24 Budget.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Professional Design Services Agreement
·Presentation
AB:jw
Orange County Sanitation District Printed on 3/29/2022Page 4 of 4
powered by Legistar™
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 1 of 20
PROFESSIONAL DESIGN SERVICES AGREEMENT
This PROFESSIONAL DESIGN SERVICES AGREEMENT, (hereinafter referred to as “Agreement”), is made and entered into to be effective the 27th day of April, 2022 by and between the ORANGE COUNTY SANITATION DISTRICT, (hereinafter referred to as "OC SAN"), and
BLACK & VEATCH CORPORATION, (hereinafter referred to as "CONSULTANT"). WITNESSETH: WHEREAS, OC SAN desires to engage CONSULTANT for Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1, Project No. P1-126; and to provide professional design services for new circular primary sedimentation basins, odor control facilities, and all ancillary facilities, (Services) and WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the necessary professional services; and WHEREAS, OC SAN has adopted procedures for the selection of professional design
services and has proceeded in accordance with said procedures to select CONSULTANT to perform the Services; and
WHEREAS, at its regular meeting on April 27, 2022 the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee pursuant to OC SAN’s Ordinance No. OC SAN-56 to approve this Agreement. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows: 1. SCOPE OF WORK CONSULTANT agrees to furnish necessary professional and technical services to accomplish those project elements outlined in the Scope of Work attached hereto as Attachment “A", and by this reference made a part of this Agreement. A. The CONSULTANT shall be responsible for the professional quality, technical
accuracy, completeness, and coordination of all design, drawings, specifications, and other services furnished by the CONSULTANT under this Agreement, including the work performed by its subconsultants (Subconsultants). Where
approval by OC SAN is indicated, it is understood to be conceptual approval only and does not relieve the CONSULTANT of responsibility for complying with all laws, codes, industry standards and liability for damages caused by errors, omissions, noncompliance with industry standards, and/or negligence on the part of the CONSULTANT or its Subconsultants. B. CONSULTANT is responsible for the quality of work prepared under this AGREEMENT and shall perform its work in accordance with professional engineering standards in effect for clarity, uniformity, and completeness. CONSULTANT shall respond to all of OC SAN’s questions, comments, suggestions, corrections, and recommendations (i.e. DS1, DS2, DS3, and FDS).
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 2 of 20
All comments shall be incorporated into the design prior to the next submittal deadline or addressed, in writing, as to why the comment has not been
incorporated. CONSULTANT shall ensure that each submittal is 100% accurate for the level of work submitted (i.e. correct references, terms, capitalization or equal status, spelling, punctuation, etc.)
C. In the event that work is not performed to the satisfaction of OC SAN and does not conform to the requirements of this Agreement or any applicable industry standards, the CONSULTANT shall, without additional compensation, promptly correct or revise any errors or deficiencies in its designs, drawings, specifications, or other services within the timeframe specified by the Project Engineer/Project Manager. OC SAN may charge to CONSULTANT all costs, expenses and damages associated with any such corrections or revisions. D. All CAD drawings, figures, and other work shall be produced by CONSULTANTS and Subconsultants using OC SAN CAD Manual. Conversion of CAD work from
any other non-standard CAD format to OC SAN format shall not be acceptable in lieu of this requirement.
Electronic files shall conform to OC SAN specifications. Any changes to these specifications by the CONSULTANT are subject to review and approval of OC SAN.
Electronic files shall be subject to an acceptance period of 30 calendar days during which OC SAN shall perform appropriate reviews and including CAD Manual compliance. CONSULTANT shall correct any discrepancies or errors detected and reported within the acceptance period at no additional cost to OC SAN. E. The CONSULTANT shall ensure that all plans and specifications prepared, or recommended under this Agreement allow for competitive bidding. The CONSULTANT shall design such plans or specifications so that procurement of services, labor or materials are not available from only one source, and shall not
design plans and specifications around a single or specific product, piece of major equipment or machinery, a specific patented design or a proprietary process, unless required by principles of sound engineering practice and
supported by a written justification that has been approved in writing by OC SAN. The CONSULTANT shall submit this written justification to OC SAN prior to beginning work on such plans and specifications. Whenever the CONSULTANT
recommends a specific product or equipment for competitive procurement, such recommendation shall include at least two brand names of products that are capable of meeting the functional requirements applicable to the project. F. All professional services performed by the CONSULTANT, including but not limited to all drafts, data, correspondence, proposals, reports, and estimates compiled or composed by the CONSULTANT, pursuant to this Agreement, are for the sole use of OC SAN, its agents and employees. Neither the documents nor their contents shall be released to any third party without the prior written consent of OC SAN. This provision does not apply to information that (a) was publicly known, or otherwise known to the CONSULTANT, at the time that it was
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 3 of 20
disclosed to the CONSULTANT by OC SAN, (b) subsequently becomes publicly known to the CONSULTANT other than through disclosure by OC SAN.
G. OC SAN shall furnish the CONSULTANT available studies, reports and other data pertinent to the CONSULTANT’s service; obtain or authorize the
CONSULTANT to obtain or provide additional reports and data as required; furnish to the CONSULTANT services of others required for the performance of the CONSULTANT’s services hereunder, and the CONSULTANT shall be entitled to use and rely upon all such information and services provided by OC SAN or others in performing the CONSULTANT’s services under this Agreement. H. CONSULTANT shall not be responsible for delays caused by circumstances beyond its reasonable control, including, but not limited to (1) strikes, lockouts, work slowdowns or stoppages or accidents, and (2) acts of God. Without limiting the above, while CONSULTANT has made reasonable efforts to incorporate into
its plan for the Project any known current project impacts of the COVID-19 pandemic, CONSULTANT has not accounted for, and is not responsible nor liable for, unknown future changes due to the COVID-19 pandemic, including,
without limitation, additional restrictions by government agencies or others (such as the availability of the site for access or client or CONSULTANT staff or others) to the extent they delay or otherwise impact the Project. In that event,
CONSULTANT will notify OC SAN and CONSULTANT shall be entitled to reasonable and equitable adjustment to the contract schedule and price to account for such impacts. The parties shall negotiate such changes in good faith to equitably address any such unexpected impacts. 2. COMPENSATION Total compensation shall be paid to CONSULTANT for the Services in accordance with the following provisions: A. Total Compensation
Total compensation shall be in an amount not to exceed Fourteen Million One Hundred Sixty-Three Thousand Dollars ($14,163,000). Total compensation
to CONSULTANT including burdened labor (salaries plus benefits), overhead, profit, direct costs, and Subconsultant(s) fees and costs shall not exceed the sum set forth in Attachment “E” - Fee Proposal.
B. Labor As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus benefits) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this project.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 4 of 20
C. Overhead
As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall compensate CONSULTANT and Subconsultants for overhead at the rate equal to the percentage of burdened labor as specified in Attachment “E” - Fee
Proposal.
The fringe and overhead rates in this Agreement are based on the 2020 financial audit report provided by CONSULTANT. CONSULTANT may request an adjustment of its fringe and overhead rates when CONSULTANT’s 2022 financial audit report is available. In that case, CONSULTANT shall provide the 2022 financial audit to OC SAN for validation. If agreed upon, the adjusted fringe and overhead rates shall be fixed for the remaining duration of the Agreement.
In the event CONSULTANT does not request an adjustment to the overhead rate, then the previously agreed to overhead rate shall apply for the duration of the Agreement.
D. Profit Profit for CONSULTANT and Subconsultants shall be a percentage of consulting
services fees (Burdened Labor and Overhead). When the consulting or subconsulting services amount is $250,000 or less, the maximum Profit shall be 10%. Between $250,000 and $2,500,000, the maximum Profit shall be limited by
a straight declining percentage between 10% and 5%. For consulting or subconsulting services fees with a value greater than $2,500,000, the maximum Profit shall be 5%. Addenda shall be governed by the same maximum Profit percentage after adding consulting services fees. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this project according to Attachment “E” - Fee Proposal. E. Subconsultants
For any Subconsultant whose fees for services are greater than or equal to $100,000 (excluding out-of-pocket costs), CONSULTANT shall pay to
Subconsultant total compensation in accordance with the Subconsultant amount specified in Attachment “E” - Fee Proposal.
For any Subconsultant whose fees for services are less than $100,000, CONSULTANT may pay to Subconsultant total compensation on an hourly-rate basis per the attached hourly rate Schedule and as specified in the Scope of Work. OC SAN shall pay to CONSULTANT the actual costs of Subconsultant fees and charges in an amount not to exceed the sum set forth in Attachment “E” - Fee Proposal.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 5 of 20
F. Direct Costs
OC SAN shall pay to CONSULTANT and Subconsultants the actual costs of permits and associated fees, travel and licenses for an amount not to exceed the sum set forth in Attachment “E” - Fee Proposal. OC SAN shall also pay to
CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN. Upon request, CONSULTANT shall provide to OC SAN receipts and other documentary records to support CONSULTANT’s request for reimbursement of these amounts, see Attachment “D” - Allowable Direct Costs. All incidental expenses shall be included in overhead pursuant to Section 2 - COMPENSATION above. G. Other Direct Costs Other Direct Costs incurred by CONSULTANT and its Contractor due to modifications to the Scope of Work resulting from field investigations and field
work required by the Agreement. These items may include special equipment, test equipment and tooling and other materials and services not previously identified. Refer to Attachment “D” Allowable Direct Costs for payment
information. H. Reimbursable Direct Costs
OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this Agreement. The reimbursement of the above-mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at http://www.gsa.gov/portal/category/104711#. The CONSULTANT shall be responsible for the most economical and practical means of management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and
practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical.
CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN.
Travel and travel arrangements – Any travel involving airfare, overnight stays or multiple day attendance must be approved by OC SAN in advance. Local Travel is considered travel by the CONSULTANT within OC SAN general geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 6 of 20
Lodging – Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the
discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN.
Travel Meals – Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals. Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this Agreement. I. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services
described in CONSULTANT’s Proposal will exceed seventy-five percent (75%) of the not-to-exceed amount of the Agreement, including approved additional compensation, CONSULTANT shall notify OC SAN immediately, and in writing.
This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the express written consent of OC SAN’s authorized representative shall
be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this Agreement. 3. REALLOCATION OF TOTAL COMPENSATION OC SAN, by its Director of Engineering, shall have the right to approve a reallocation of the incremental amounts constituting the total compensation, provided that the total compensation is not increased.
4. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period. CONSULTANT shall allocate costs
in the same manner as it would for payment requests as described in this Section of the Agreement. CONSULTANT shall warrant and certify the accuracy of these costs and understand that submitted costs are subject to Section 11 - AUDIT PROVISIONS. B. CONSULTANT may submit monthly or periodic statements requesting payment for those items included in Section 2 - COMPENSATION hereof in the format as required by OC SAN. Such requests shall be based upon the amount and value of the work and services performed by CONSULTANT under this Agreement and shall be prepared by CONSULTANT and accompanied by such supporting data, including a detailed breakdown of all costs incurred and project element work
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 7 of 20
performed during the period covered by the statement, as may be required by OC SAN.
Upon approval of such payment request by OC SAN, payment shall be made to CONSULTANT as soon as practicable of one hundred percent (100%) of the
invoiced amount on a per-project-element basis. If OC SAN determines that the work under this Agreement or any specified project element hereunder, is incomplete and that the amount of payment is in excess of: i. The amount considered by OC SAN’s Director of Engineering to be adequate for the protection of OC SAN; or ii. The percentage of the work accomplished for each project element.
He may, at his discretion, retain an amount equal to that which ensures that the total amount paid to that date does not exceed the percentage of the completed work for each project element or the project in its entirety.
C. CONSULTANT may submit periodic payment requests for each 30-day period of this Agreement for the profit as set forth in Section 2 - COMPENSATION above.
Said profit payment request shall be proportionate to the work actually accomplished to date on a per-project-element basis. In the event OC SAN's Director of Engineering determines that no satisfactory progress has been made since the prior payment, or in the event of a delay in the work progress for any reason, OC SAN shall have the right to withhold any scheduled proportionate profit payment. D. Upon satisfactory completion by CONSULTANT of the work called for under the terms of this Agreement, and upon acceptance of such work by OC SAN, CONSULTANT will be paid the unpaid balance of any money due for such work, including any retained percentages relating to this portion of the work.
E. Upon satisfactory completion of the work performed hereunder and prior to final payment under this Agreement for such work, or prior settlement upon
termination of this Agreement, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this Agreement other than such
claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein. F. Pursuant to the California False Claims Act (Government Code Sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this Agreement may be held liable for treble damages and up to a ten thousand dollars ($10,000) civil penalty for each false claim submitted. This Section shall also be binding on all Subconsultants. A CONSULTANT or Subconsultant shall be deemed to have submitted a false claim when the CONSULTANT or Subconsultant: a) knowingly presents or causes
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 8 of 20
to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; b) knowingly makes, uses, or causes to be made or used a
false record or statement to get a false claim paid or approved by OC SAN; c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; d) knowingly makes, uses, or causes to be made or used a false record
or statement to conceal, avoid, or decrease an obligation to OC SAN; or e) is a beneficiary of an inadvertent submission of a false claim to OC SAN, and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim. 5. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR
and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section
1771.4, the work is subject to compliance monitoring and enforcement by the DIR.
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776. C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations.
D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8,
California Code of Regulation Section 16461(e). 6. DOCUMENT OWNERSHIP – SUBSEQUENT CHANGES TO PLANS AND SPECIFICATIONS A. Ownership of Documents for the Services performed.
All documents, including but not limited to, original plans, studies, sketches, drawings, computer printouts and disk files, and specifications prepared in connection with or related to the Scope of Work or Services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed. OC SAN ownership entitlement arises upon payment or any partial payment for work performed and includes ownership of any and all work product completed prior to that payment. This
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 9 of 20
Section shall apply whether the CONSULTANT’s Services are terminated: a) by the completion of the Agreement, or b) in accordance with other provisions of this
Agreement. Notwithstanding any other provision of this paragraph or Agreement, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer printouts and disk files, and specifications.
B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the plans or specifications, where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service rendered by CONSULTANT was not a proximate cause of the damage. 7. INSURANCE A. General i. Insurance shall be issued and underwritten by insurance companies
acceptable to OC SAN. ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial
Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Workers’
Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent. iii. Coverage shall be in effect prior to the commencement of any work under this Agreement. B. General Liability
The CONSULTANT shall maintain during the life of this Agreement, including the period of warranty, commercial general liability insurance written on an
occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000) aggregate. If aggregate limits apply separately to this contract (as
evidenced by submission of ISO form CG 25 03 or 25 04), then aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: premises-operations, products liability/completed operations (including any product manufactured or assembled), broad form property damage, contractual liability, independent contractors liability, personal and advertising injury, mobile equipment, vicarious liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) and Riggers/On Hook Liability must be included in the general liability policy and coverage must be reflected on the
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 10 of 20
submitted certificate of insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible
clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor, or subcontractor performing
work or rendering services on behalf of OC SAN in connection with the planning, development, and construction of the project. In all its insurance coverages related to the work (except Errors and Omissions/Professional Liability), CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their officers, agents, or employees, or any other consultant, contractor, or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise,
(b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged.
C. Umbrella Excess Liability The minimum limits of general liability and automobile liability insurance required,
as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automobile liability. D. Automobile/Vehicle liability Insurance The CONSULTANT shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability
coverage: combined single limit of One Million Dollars ($1,000,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement.
E. Drone Liability Insurance
If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of one million dollars ($1,000,000) in form acceptable to OC SAN. F. Workers’ Compensation Insurance The CONSULTANT shall provide such workers’ compensation insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including employer’s liability insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such workers’ compensation insurance shall be endorsed to provide for a waiver of subrogation in favor of
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 11 of 20
OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California
Insurance Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones
Act claims. G. Errors and Omissions/Professional Liability CONSULTANT shall maintain in full force and effect, throughout the term of this Agreement, standard industry form professional negligence errors and omissions insurance coverage in an amount of not less than Five Million Dollars ($5,000,000) with limits in accordance with the provisions of this paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of five (5) years from the date of the completion of the services
hereunder. In the event of termination of said policy during this period, CONSULTANT shall
obtain continuing insurance coverage for the prior acts or omissions of CONSULTANT during the course of performing services under the term of this Agreement. Said coverage shall be evidenced by either a new policy evidencing
no gap in coverage or by separate extended “tail” coverage with the present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis, said policy shall be continued in full force and effect during the term of this Agreement or until completion of the services provided for in this Agreement, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts of CONSULTANT during the course of performing services under the term of this Agreement.
CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy, and shall provide renewal certificates not less
than ten (10) days prior to the expiration of each policy term. H. Proof of Coverage
The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said certificates and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before work commences. CONSULTANT shall provide the SANITATION DISTRICT with copies of its insurance certificates and amendatory endorsements affecting coverage. Confidential information may be redacted from said policies, provided that verification of coverage, name of carriers and agent/broker may not be redacted. Said policies and endorsements shall conform to the requirements herein stated.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 12 of 20
The following are approved forms that must be submitted as proof of coverage:
• Certificate of Insurance ACORD Form 25 or other equivalent certificate of insurance form.
• Additional Insurance (General Liability)
The combination of (ISO Forms) CG 20 10 and CG 20 37
All other additional insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide
different or less coverage to OC SAN.
• Additional Insured (Automobile Liability)
Submit endorsement provided by carrier for
OC SAN approval.
• Waiver of Subrogation Submit workers’ compensation waiver of
subrogation endorsement provided by carrier for OC SAN approval.
• Cancellation Notice No endorsement is required. However, Vendor/Contractor is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below. I. Cancellation and Policy Change Notice The CONSULTANT is required to notify OC SAN in writing of any insurance cancellation notice it receives or other knowledge of pending or actual insurance policy cancellation, within two (2) working days of receipt of such notice or
acquisition of such knowledge. Additionally, the CONSULTANT is required to notify OC SAN in writing of any change in the terms of insurance, including reduction in coverage or increase in deductible/SIR, within two (2) working days
of receipt of such notice or knowledge of same. Said notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT 10844 Ellis Avenue Fountain Valley, CA 92708 Attention: Contracts, Purchasing & Materials Management Division J. Primary Insurance The general and automobile liability policies shall contain a Primary and “Non Contributory” clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 13 of 20
K. Separation of Insured
The general and automobile liability policies shall contain a “Separation of Insureds” clause.
L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this Agreement, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property. M. Deductibles and Self-Insured Retentions Any deductible and/or self-insured retention must be declared to OC SAN on the certificate of insurance. All deductibles and/or self-insured retentions require
approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN
guaranteeing payment of losses and related investigations, claim administration and defense expenses. OC SAN will not invoke the option expressed in this paragraph unless it has reasonable cause to question CONSULTANT’s financial
strength. N. Defense Costs The general and automobile liability policies (except Errors and Omissions/Professional Liability) shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits. O. Subconsultants
The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work. P. Limits Are Minimums
If the CONSULTANT maintains higher limits than any minimums shown above,
then OC SAN requires and shall be entitled to coverage for the higher limits maintained by CONSULTANT. Nothing in this section, however, requires CONSULTANT in the absence of litigation to reveal its Errors and Omissions/Professional Liability limits beyond that required above in Section 7.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 14 of 20
8. SCOPE CHANGES
In the event of a change in the Scope of Work, requested by OC SAN, the parties hereto shall execute an amendment to this Agreement setting forth with particularity all terms of the new Agreement, including but not limited to any additional CONSULTANT's fees.
9. PROJECT TEAM AND SUBCONSULTANTS CONSULTANT shall provide to OC SAN, prior to execution of this Agreement, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used on this project by CONSULTANT. CONSULTANT shall include a description of the scope of work to be done by each Subconsultant and each CONSULTANT’s project team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant on a per-project-element basis, broken down as indicated in Section 2 - COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT’s project
team members without prior written approval by OC SAN. 10. ENGINEERING REGISTRATION
The CONSULTANT’s personnel are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered
engineer but represents and agrees that wherever in the performance of this Agreement requires the services of a registered engineer. Such services hereunder will be performed under the direct supervision of registered engineers. 11. AUDIT PROVISIONS A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this Agreement. The CONSULTANT shall include OC SAN’s right as described above, in any and
all of their subcontracts, and shall ensure that these rights are binding upon all Subconsultants.
B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect
costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this Agreement during the term of this Agreement and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 15 of 20
CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified
employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all project related accounting records and documents, and any other financial data.
12. LEGAL RELATIONSHIP BETWEEN PARTIES The legal relationship between the parties hereto is that of an independent contractor and nothing herein shall be deemed to make CONSULTANT an employee of OC SAN. 13. NOTICES All notices hereunder and communications regarding the interpretation of the terms of this Agreement, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return
receipt requested, postage prepaid. Notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT 10844 Ellis Avenue Fountain Valley, CA 92708-7018
Attention: Wai Chan, Contracts Administrator Copy: Andrew Brown, Project Manager Notices shall be mailed to CONSULTANT at:
BLACK & VEATCH CORPORATION 550 S. Hope Street, Suite 2250 Los Angeles, CA 90071 Attention: James H. Clark, Senior Vice President All communication regarding the Scope of Work, will be addressed to the Project Manager. Direction from other OC SAN’s staff must be approved in writing by OC SAN’s Project Manager prior to action from the CONSULTANT. 14. TERMINATION
OC SAN may terminate this Agreement at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination,
CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination. CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this Agreement, when the same are due.
Notice of termination shall be mailed to OC SAN and/or CONSULTANT in accordance with Section 13 - NOTICES.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 16 of 20
15. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, computation and study materials in its
files pertaining to the work described in this Agreement, which is requested in writing by OC SAN. 16. COMPLIANCE A. Labor CONSULTANT certifies by the execution of this Agreement that it pays employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all federal, state and local directives
and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment.
B. Air Pollution
CONSULTANT and its subconsultants and subcontractors shall comply with all applicable federal, state and local air pollution control laws and regulations. C. Iran Contracting Act CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208). 17. AGREEMENT EXECUTION AUTHORIZATION Both OC SAN and CONSULTANT do covenant that each individual executing this
document by and on behalf of each party is a person duly authorized to execute agreements for that party. 18. DISPUTE RESOLUTION In the event of a dispute arising between the parties regarding performance or
interpretation of this Agreement, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services. 19. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which it may be entitled.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 17 of 20
20. PROGRESS REPORTS
Monthly progress reports shall be submitted for review by the tenth day of the following month and must include as a minimum: 1) current activities, 2) future activities, 3) potential items that are not included in the Scope of Work, 4) concerns and possible
delays, 5) percentage of completion, and 6) budget status. 21. WARRANTY CONSULTANT shall perform its services in accordance with generally accepted industry and professional standards. If, within the 12-month period following completion of its services, OC SAN informs CONSULTANT that any part of the services fails to meet those standards, CONSULTANT shall, within the time prescribed by OC SAN, take all such actions as are necessary to correct or complete the noted deficiency(ies). 22. INDEMNIFICATION
To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN,
which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, CONSULTANT’s, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages,
liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and OC SAN’s general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in carrying out its obligations under this Agreement to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, CONSULTANT, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding
the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from:
(A) the active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or
(C) the independent action of a third party who is neither one of the Indemnified Parties nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them. Exceptions (A) through (B) above shall not apply, and CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 18 of 20
CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the
provisions of this Agreement. Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this Agreement are
contractual and the result of negotiation between the parties hereto. Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting party, shall not be employed in the interpretation of this Agreement. 23. DUTY TO DEFEND The duty to defend hereunder is wholly independent of and separate from the duty to indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code Section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without
regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the
payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution
expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then the DISTRICT will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims. CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this Agreement until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 24. CONSULTANT PERFORMANCE
The CONSULTANT’s performance shall be evaluated by OC SAN. A copy of the evaluation shall be sent to the CONSULTANT for comment. The evaluation, together
with the comments, shall be retained by OC SAN and may be considered in future CONSULTANT selection processes. 25. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES CONSULTANT shall comply with all OC SAN policies and procedures including the Contractor Safety Standards, as applicable, all of which may be amended from time to time. 26. CLOSEOUT When OC SAN determines that all work authorized under the Agreement is fully complete and that OC SAN requires no further work from CONSULTANT, or the Agreement is otherwise terminated or expires in accordance with the terms of the
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 19 of 20
Agreement, OC SAN shall give the Consultant written notice that the Agreement will be closed out. CONSULTANT shall submit all outstanding billings, work submittals,
deliverables, reports or similarly related documents as required under the Agreement within thirty (30) days of receipt of notice of Agreement closeout.
Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the Agreement and will either: i. Give the CONSULTANT a final Agreement Acceptance: or ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in this Agreement. Such support must be provided within the timeframe requested by OC SAN.
Notwithstanding the final Agreement Acceptance the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to
complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise); and the CONSULTANT shall remain obligated under all those provisions of
the Agreement which expressly or by their nature extend beyond and survive final Agreement Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final Agreement Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or agreement with, the CONSULTANT’s request for final Agreement Acceptance. 27. OPINIONS OF COST OC SAN acknowledges that construction estimates, financial analyses and feasibility
projections are subject to many influences including, but not limited to, price of labor and materials, unknown or latent conditions of existing equipment or structures, and time or quality of performance by third parties. OC SAN acknowledges that such influences may
not be precisely forecasted and are beyond the control of CONSULTANT and that actual costs incurred may vary substantially from the estimates prepared by CONSULTANT. CONSULTANT does not warrant or guarantee the accuracy of construction or
development cost estimates.
28. ENTIRE AGREEMENT This Agreement constitutes the entire understanding and agreement between the
Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof.
PDSA PROJECT NO. P1-126
Revised 062821 PRIMARY SEDIMENTATION BASINS NO. 3-5 REPLACEMENT AT PLANT NO. 1
Page 20 of 20
IN WITNESS WHEREOF, this Agreement has been executed in the name of OC SAN and CONSULTANT by their respective duly authorized officers as of the day and year first written
above.
BLACK & VEATCH CORPORATION
By __________________________________________________ Date
__________________________________________________ Printed Name & Title ORANGE COUNTY SANITATION DISTRICT
By __________________________________________________
John B. Withers Date
Board Chairman
By __________________________________________________ Kelly A. Lore Date Clerk of the Board
By __________________________________________________ Ruth Zintzun Date Purchasing & Contracts Manager Attachments: Attachment “A” Scope of Work Attachment “B” Labor Hour Matrix Attachment “C” Not Attached Attachment “D” Allowable Direct Costs Attachment “E” Fee Proposal Attachment “F” Not Used Attachment “G” Not Attached
Attachment “H” Not Used Attachment “I” Cost Matrix and Summary Attachment “J” Not Attached
Attachment “K” Minor Subconsultant Hourly Rate Schedule Attachment “L” Contractor Safety Standards Attachment “M” Iran Contracting Act Verification
WC:yp
ATTACHMENT “A”
SCOPE OF WORK
04-02-2020 P1-126 – Design SOW
Page 1 of 61
ATTACHMENT "A"
SCOPE OF WORK
Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1
Project No. P1-126
04-02-2020 P1-126 – Design SOW
Page 2 of 61
TABLE OF CONTENTS
1. PROJECT REQUIREMENTS ................................................................................................................ 5
SUMMARY...................................................................................................................... 5
1.0.1 Professional Design Engineering Services ............................................................ 5
1.0.2 Professional Licensing requirements ..................................................................... 5
BACKGROUND .............................................................................................................. 5
GENERAL PROJECT DESCRIPTION ....................................................................... 5
PROJECT EXECUTION PHASES............................................................................... 6
DESCRIPTION OF PROJECT ELEMENTS .............................................................. 6
1.4.1 PROJECT ELEMENT 1 – DEMOLITION .......................................................... 6
1.4.2 PROJECT ELEMENT 2 – PRIMARY CLARIFIERS 3, 4, and 5 ........................ 8
1.4.3 PROJECT ELEMENT 3 – ODOR TREATMENT SYSTEM .............................. 9
1.4.4 PROJECT ELEMENT 4 – PRIMARY METERING STRUCTURES .............. 10
1.4.5 PROJECT ELEMENT 5 – ELECTRICAL IMPROVEMENTS ......................... 10
1.4.6 PROJECT ELEMENT 6 – YARD PIPING ........................................................ 12
1.4.7 PROJECT ELEMENT 7 – UTILITIES & MISCELLANEOUS ITEMS ........... 13
1.4.8 Temporary Facilities During Construction .......................................................... 13
1.4.9 Coordination with Other Projects ........................................................................ 13
DESIGN CONSIDERATIONS .................................................................................... 14
1.5.1 Technology and configuration choices ................................................................ 14
1.5.2 Design Decisions ................................................................................................. 15
1.5.3 Design Selection Criteria..................................................................................... 15
1.5.4 Project Element Description Revisions ............................................................... 15
1.5.5 Cost Model .......................................................................................................... 15
PROJECT SCHEDULE ............................................................................................... 15
1.6.1 General ................................................................................................................ 15
2. PHASE 2 – PRELIMINARY DESIGN .................................................................................................. 16
Preliminary Design Execution ...................................................................................... 17
2.0.1 Preliminary Design Decision Plan (PDDP) ......................................................... 17
Preliminary Design Production .................................................................................... 17
2.1.1 General ................................................................................................................ 17
2.1.2 Design Memos ..................................................................................................... 17
2.1.3 Project Specific Design Memos .......................................................................... 20
2.1.4 Preliminary Design Drawings ............................................................................. 20
2.1.5 Preliminary Design Report (PDR) Production, Contents and Organization ....... 20
2.1.6 Preliminary Design Cost Estimate ...................................................................... 21
Preliminary Design Activities ....................................................................................... 21
2.2.1 Plant No. 1 Hydraulic Model Update .................................................................. 21
2.2.2 Condition Assessment ......................................................................................... 23
2.2.3 Primary Odor Scrubber Complex Condition Assessment ................................... 23
2.2.4 Primary Odor Scrubber Complex Rehabilitation and Replacement .................... 24
2.2.5 Primary Effluent Pipeline Configurations ........................................................... 24
2.2.6 Primary Metering Structure ................................................................................. 24
2.2.7 Easements, Property Boundaries and Work Area Limits .................................... 25
2.2.8 Topographic Survey ............................................................................................ 25
2.2.9 Geotechnical Investigation .................................................................................. 25
2.2.10 Utility Investigation ............................................................................................. 26
2.2.11 Fire Protection Services....................................................................................... 29
1.0
1.1
l.2
].3
1.4
1.5
].6
2.0
2.1
2.2
04-02-2020 P1-126 – Design SOW
Page 3 of 61
2.2.12 Electrical Load Measurements ............................................................................ 29
2.2.13 Value Engineering Assistance ............................................................................. 30
2.2.14 Environmental Documentation ............................................................................ 31
2.2.15 Permitting Assistance .......................................................................................... 31
2.2.16 Project Management ............................................................................................ 33
2.2.17 Risk Management ................................................................................................ 34
2.2.18 Quality Control .................................................................................................... 35
PDR Workshops and Meetings .................................................................................... 35
2.3.1 General ................................................................................................................ 35
2.3.2 PDR Production Workshops ............................................................................... 35
2.3.3 Design memo Workshops ................................................................................... 36
2.3.4 Project Specific Design Memo Workshops ......................................................... 36
2.3.5 PDR Review Workshops ..................................................................................... 37
2.3.6 Equipment and Process Redundancy Workshop ................................................. 37
2.3.7 Maintainability Workshops ................................................................................. 38
2.3.8 PDR Constructability Workshop ......................................................................... 39
2.3.9 Technical Progress Meetings............................................................................... 39
2.3.10 Focused Meetings ................................................................................................ 39
2.3.11 Coordination with Other Projects Meetings ........................................................ 40
2.3.12 Stormwater Compliance Meeting ........................................................................ 41
3. PHASE 3 – DESIGN ............................................................................................................................ 41
Bid Documents ............................................................................................................... 41
3.0.1 General ................................................................................................................ 41
3.0.2 Engineering Design Guideline Updates .............................................................. 41
3.0.3 General Requirements and Additional General Requirements ............................ 41
3.0.4 Design submittals ................................................................................................ 42
3.0.5 Cable and Conduit Schedule ............................................................................... 42
3.0.6 Commissioning Plan Materials ........................................................................... 42
3.0.7 Equipment and Instrumentation Database (EID) ................................................ 43
3.0.8 SCADA Administration Tool (SAT) .................................................................. 43
3.0.9 Construction Submittal Items List ....................................................................... 43
3.0.10 Temporary Facilities During Contruction ........................................................... 44
Design Support Documentation ................................................................................... 44
3.1.1 Design Submittal Support Documentation .......................................................... 44
3.1.2 Construction Cost Estimate ................................................................................. 45
3.1.3 Construction Schedule ......................................................................................... 45
3.1.4 Procurement Alternatives .................................................................................... 46
Design Activities ............................................................................................................ 46
3.2.1 Easements, Property Boundaries and Work Area Limits .................................... 46
3.2.2 Topographic Survey ............................................................................................ 46
3.2.3 Geotechnical Baseline Report ............................................................................. 46
3.2.4 Utility Investigation ............................................................................................. 47
3.2.5 Fire Protection Services....................................................................................... 47
3.2.6 Noise Evaluation Services ................................................................................... 47
3.2.7 Environmental Documentation ............................................................................ 47
3.2.8 Permitting assistance ........................................................................................... 47
3.2.9 Project Management ............................................................................................ 48
3.2.10 Risk Management ................................................................................................ 48
3.2.11 Quality Control .................................................................................................... 48
Design Workshops and Meetings ................................................................................. 48
2.3
3.0
3.1
3.2
3.3
04-02-2020 P1-126 – Design SOW
Page 4 of 61
3.3.1 General ................................................................................................................ 48
3.3.2 Design Phase Workshops .................................................................................... 48
3.3.3 Pre-DS2 Constructability Workshop ................................................................... 49
3.3.4 Design Phase Meetings ....................................................................................... 50
3.3.5 Consultant Office Technical Meetings (COTMs) ............................................... 52
3.3.6 Coordination with Other Projects Meetings ........................................................ 52
3.3.7 Commissioning Team Meetings .......................................................................... 53
3.3.8 Safety and Risk Meeting ..................................................................................... 53
3.3.9 Construction Submittal Items List Meeting ........................................................ 54
3.3.10 Stormwater Compliance Meeting ........................................................................ 54
Bid Phase Support Services .......................................................................................... 54
3.4.1 Bid Phase Support Services ................................................................................. 54
3.4.2 Bid Evaluation Assistance ................................................................................... 54
3.4.3 Conformed Document Preparation ...................................................................... 54
4. PHASE 4 – CONSTRUCTION AND INSTALLATION SERVICES ..................................................... 54
5. PHASE 5 – COMMISSIONING SERVICES ........................................................................................ 54
6. PHASE 6 – CLOSE OUT .................................................................................................................... 54
7. GENERAL REQUIREMENTS ............................................................................................................. 54
GENERAL ..................................................................................................................... 54
7.0.1 OC San Engineering Design Guidelines and Strategic Plan ............................... 54
7.0.2 Project Phases and Tasks ..................................................................................... 55
7.0.3 Construction Sequencing and Constraints ........................................................... 55
7.0.4 Working Hours .................................................................................................... 55
7.0.5 Standard Drawings and Typical Details .............................................................. 56
7.0.6 Software .............................................................................................................. 56
7.0.7 Submittal Review using Bluebeam ..................................................................... 56
7.0.8 Word Track Changes ........................................................................................... 56
7.0.9 GIS Submittals .................................................................................................... 56
7.0.10 PMWeb Procedures ............................................................................................. 57
8. PROJECT-SPECIFIC DEVIATIONS FROM OC SAN DESIGN GUIDELINES .................................. 58
ENGINEERING DESIGN GUIDELINES CHAPTER 01, “DESIGN GUIDELINES
– GENERAL REQUIREMENTS” ........................................................................................... 58
8.0.1 SECTION 1.2.15 “mISCELLANEOUS REQUIREMENTS” ............................ 58
8.0.2 ENGINEERING DESIGN GUIDELINES CHAPTER 06, “MECHANICAL
DESIGN” ........................................................................................................................ 59
8.0.3 NOT USED ......................................................................................................... 59
8.0.4 ENGINEERING DESIGN GUIDELINES, CHAPTER 11,
“INSTRUMENTATION AND CONTROL” .................................................................. 60
9. STAFF ASSISTANCE ......................................................................................................................... 60
10. EXHIBITS ............................................................................................................................................ 60
3.4
7.0
8.0
04-02-2020 P1-126 – Design SOW
Page 5 of 61
1. PROJECT REQUIREMENTS
SUMMARY
1.0.1 PROFESSIONAL DESIGN ENGINEERING SERVICES
A. Provide professional design engineering services for the project as described herein.
1. Preliminary Design Report
2. Environmental documentation services
3. Permitting assistance
4. Preparation of bid documents
1.0.2 PROFESSIONAL LICENSING REQUIREMENTS
A. All plans and specifications shall be prepared by a professional engineer licensed in the
State of California of the associated discipline.
B. CONSULTANT shall secure the services of a Professional Architect licensed in the
State of California to determine the architectural requirements, develop and prepare
preliminary design documents, and prepare final plans and specifications.
C. CONSULTANT shall secure the services of a Professional Fire Protection Engineer
licensed in the State of California to determine fire protection requirements, develop and
prepare preliminary design documents, and prepare final plans and specifications.
BACKGROUND
There are various primary treatment facilities at Plant 1, the oldest being the three circular primary
clarifiers. These facilities were constructed around the early 1960’s by projects P1-1 and P1-11 and are
nearing the end of their useful life.
A concept study was performed in 2017 to assess the condition of the east side primary treatment
facilities and identify recommended improvements. The study concluded the best alternative is to replace
the primary clarifiers in-kind, only at a higher elevation to allow for the abandonment of the Primary
Effluent Pump Station (PEPS).
A subsequent study, PS19-02, also evaluated the facilities to understand if P1-126 could take a phased
approach to construction to allow for some amount of treatment capacity to be available from the circular
primary clarifiers. The conclusion of this study was that, while possible, a phased approach is not
preferred.
GENERAL PROJECT DESCRIPTION
The primary purpose of this project is to replace Primary Clarifiers 3, 4, and 5 (circular) at Plant 1, which
are nearing the end of their useful life. The replacement clarifiers will renew the useful life of this process
area, providing necessary treatment capacity and flexibility. The project will also replace all ancillary
facilities necessary for the operation of the clarifiers, such as electrical facilities, yard piping, and utilities.
The project will also demolish the old control center and primary clarifiers 1 and 2. The project includes
the replacement of the primary scrubber facility with a new facility adequate to treat odors from Primary
Clarifiers 3-31 (circular and rectangular). Figure 1 shows the general boundary of the project. Exhibit 19
Plant No. 1 Hydraulic Map shows structures and pipelines referenced in this scope of work and provides
an overview of the general hydraulic layout.
1.0
1.1
1.2
04-02-2020 P1-126 – Design SOW
Page 6 of 61
Figure 1 – Project P1-126 Boundary
PROJECT EXECUTION PHASES
All OC San projects are divided into six phases. CONSULTANT shall provide engineering services for all
Project Elements listed in this Scope of Work for the following Phases:
Phase 1 – Project Development (Not in this Scope of Work)
Phase 2 – Preliminary Design
Phase 3 – Design
Phase 4 – Construction (Not in this Scope of Work)
Phase 5 – Commissioning (Not in this Scope of Work)
Phase 6 – Close Out (Not in this Scope of Work)
DESCRIPTION OF PROJECT ELEMENTS
Detailed descriptions of the Project Elements are presented below.
1.4.1 PROJECT ELEMENT 1 – DEMOLITION
1.3
1.4
04-02-2020 P1-126 – Design SOW
Page 7 of 61
A. The construction of Primary Clarifiers 3, 4, and 5 will require the demolition of certain
existing facilities that include, but may not be limited to, the following (reference Exhibit 19 Plant
No. 1 Hydraulic Map for location of these structures):
1. Primary clarifier 3-5 structures and associated mechanical and electrical equipment
including:
a. Sludge/scum pump room for Primary Clarifiers 3 and 4
b. Electrical room for Primary Clarifiers 3 and 4
c. Sludge/scum pump room for Primary Clarifier 5
d. Electrical room for Primary Clarifier 1, 2 and 5
2. Influent structure JS-A from Headworks 1, if required to replace influent piping
3. Eastside Basin Distribution Box (EBDB)
4. Primary Effluent Diversion Box 1 (PEDB-1)
5. Primary Effluent Pump Station (PEPS) equipment
6. Primary Effluent Junction Box (PEJB) if the facility cannot accommodate the future
hydraulic conditions
7. Effluent structures JB-B, JB-C, JB-5, JB-4, and primary effluent piping between these
structures and PEPS as required to facilitate construction of new piping and for hydraulic
improvements
8. 42-inch primary influent pipes from EBDB to each clarifier
9. All effluent piping between the clarifiers and PEPS including:
a. 42-inch to 54-inch pipes from each clarifier to PEJB
b. 48-inch and 60-inch pipes from PEJB to PEDB-1
c. 60-inch pipe from PEDB-1 to PEPS
10. Plant utilities within the construction area as required to facilitate demolition and
construction of the major facilities including but not limited to water, air, natural gas, and
drains. Relocation of utilities are covered by Project Element 7 Utilities and Miscellaneous
Items.
11. Primary Odor Control Facility including foul air piping, scrubbers, fans, and chemical
equipment
B. Demolition of additional structures not directly related to the replacement of Primary
Clarifiers 3, 4 and 5 and the primary odor control system include:
1. Primary Clarifiers 1 and 2
2. Old Control Center Building
3. Power Building 4 electrical equipment and standby generator as described in Project
Element 5
C. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the
CONSULTANT shall make the following assumptions regarding this project element:
a. Foul air piping for Primary Clarifiers 3 and 4 will be demolished or abandoned,
whichever is more practical, and replaced in entirety. Foul air piping for Primary
Clarifiers 6-31 will only be demolished and replaced to the extent required to facilitate
04-02-2020 P1-126 – Design SOW
Page 8 of 61
construction of and connection to the new Primary Odor Control Facility. Primary odor
control treatment capacity must be maintained during construction of this project.
b. Tunnels 12 and 14 must be protected in place except for the portion of Tunnel
12 between Tunnel 14 and the Primary Clarifiers 3 and 4 pump room.
c. All other existing tunnels will be protected in place.
d. Demolition of the PEPS facility will include only the mechanical, piping,
associated electrical, and ancillary support equipment. The building will be protected in
place because it is shared with Blower Building 1.
e. Cengen catalytic converters (Project J-111) are supported by the south wall of
primary clarifiers 1-2. The catalytic converters must be protected in place.
f. Plant radio tower adjacent to the Old Control Center must be relocated to
facilitate demolition of the Old Control Center.
1.4.2 PROJECT ELEMENT 2 – PRIMARY CLARIFIERS 3, 4, AND 5
A. Replacement of the three existing circular primary clarifiers (3, 4, and 5) is required per
Alternative 2 of the Concept Report. The clarifiers will be replaced in-kind, approximately in the
same locations, with the same treatment and hydraulic capacity, but with a higher operating
elevation to allow for gravity flow to Activated Sludge Plant 1 (AS-1). All mechanical and
electrical support facilities including sludge and scum pump rooms, electrical rooms, ventilation
systems and piping, drain systems, utility systems, piping, cables, and conduit will be replaced.
The clarifiers will have sludge blanket analyzers, sludge density meters, weir washing system,
and a tank washing system. Primary sludge will be conveyed through a new 12-inch primary
sludge line (PS3) from the new clarifiers through Tunnels 12, 13, and 9 to the digesters and
along East Perimeter Road to the thickening process.
B. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the
CONSULTANT shall make the following assumptions regarding this project element:
a. Demolition and replacement of all three clarifiers will occur concurrently. Phased
clarifier construction was evaluated under PS19-02 and is not preferred (see Exhibit 19).
However, completion of effluent structures between PEJB and AS-1 may be required as
early completion milestones in order to improve wet weather flow conveyance from
Primary Clarifiers 6-31 to the secondary process prior to completion of the clarifiers and
the influent piping.
b. The clarifiers will have flat covers, with the same functionality as the aluminum
covers designed for the P2-98A project with at least 80% of cover panels hinged to allow
visual observation of the water surface. The covers may require a sole source
procurement. Drawings of the P2-98A covers are included in Exhibit 19.
c. The new basins will be designed at a higher hydraulic grade to allow for the
elimination of the downstream PEPS. The new hydraulic grade will also allow for greater
flexibility to manage flow between the eastside and westside clarifiers, and for primary
effluent flow routing between AS-1, AS-2, and the Trickling Filters under various flow
conditions.
d. Primary Clarifiers 3 and 4 are currently served by a common pump room and
electrical room. Primary clarifier 5 is served by its own pump room and electrical room
which also serves existing Primary Clarifiers 1 and 2. Two separate pump rooms and
two separate electrical rooms are required to serve the three clarifiers due to their
location and Tunnels 12 and 14.
04-02-2020 P1-126 – Design SOW
Page 9 of 61
e. New arc-rated motor control centers, RIO panels, PLC, network equipment, field
control panels, and associated power distribution equipment will be housed in the new
electrical rooms. All existing cables, conduits, and instrumentation will be replaced.
f. The existing PS1 and PS2 pipelines will also serve Primary Clarifiers 3-5,
however the new PS3 pipeline will convey primary sludge only from the Primary
Clarifiers 3-5. The new PS3 pipeline will connect to the sludge blend tanks at the
Thickening and Dewatering facility and the digesters. Connections at the digesters will
be on the PS1/PS2 header or in the TWAS connection. No new digester penetrations
are required. The alignment of the PS3 pipeline will be along the same general
alignment as the existing PS1/PS2 pipelines through Tunnels 12, 13, 9 and along the
pipe rack on East Perimeter Road. Modifications to the existing pipe racks will be
required to accommodate the new pipeline. Drawings of the pipe rack on East Perimeter
Road are included in Exhibit 19.
g. Analysis of the clarifiers includes identifying the maximum allowable treatment
capacity of the new clarifiers beyond the existing capacity. Identifying the maximum
recommended clarifier capacity shall be limited to a review of industry accepted practice
and CONSULTANT experience. Recommendations will be presented for clarifier
improvements to maximize capacity (e.g. sidewater depth, perimeter baffles, or center
feedwell baffles). Additional analysis including, but not limited to, CFD modeling of the
clarifiers is not included in this effort.
1.4.3 PROJECT ELEMENT 3 – ODOR TREATMENT SYSTEM
A. Foul air from the existing Primary Clarifiers 1-5, Primary Clarifiers 6-31, and EBDB is
currently treated at the Primary Odor Scrubber Complex for hydrogen sulfide (H2S). Foul air
from three 48-inch pipes from the westside clarifiers (Primary Clarifiers 6-31) and two 48-inch
pipes from the eastside clarifiers (Primary Clarifiers 1-5) currently combine in a common header
at the Primary Odor Scrubber Complex and is fed into four chemical scrubbers operating in a
three duty, one standby configuration. However, currently all four scrubbers are needed to be in
operation to serve Primary Clarifiers 6-31. Four, two-speed blowers convey approximately
120,000 cfm of combined foul air from all the primary clarifiers. Odor is treated using caustic,
bleach, and muriatic acid chemical feeds based on monitored hydrogen sulfide levels.
B. The existing Primary Odor Scrubber Complex does not have sufficient capacity to
provide the required air exchanges per hour to all of the eastside and westside primary clarifiers
and is at the end of its useful life. A new, single Primary Odor Scrubber Complex serving
Primary Clarifiers 6-31, Primary Clarifiers 3-5, and the EBDB will be constructed to replace the
existing facility. The new facility will provide treatment of hydrogen sulfide (H2S) and methyl
mercaptan odor compounds and will be designed to meet SCAQMD permit requirements for H2S
removal.
C. The new Primary Odor Scrubber Complex will also include caustic storage, pumping,
and piping facilities to provide chemical dosing to the Trickling Filter wetwell for the purposes of
pH adjustment for snail control. New pH meters will be required at the Trickling Filters to
measure and control the caustic dosing. Currently, dosing is performed manually at the Tricking
Filters by lifting totes to the top of the wet well and feeding with a hose.
D. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the
CONSULTANT shall make the following assumptions regarding this project element:
a. The location of the new Primary Odor Scrubber Complex will be determined
during Preliminary Design. For design level of effort, assume the location will be in the
area of the existing parking lot directly west of the existing Primary Scrubber Complex
such that the existing facility may remain in service while the new facilities are
constructed.
04-02-2020 P1-126 – Design SOW
Page 10 of 61
b. New foul air ventilation ductwork from the westside clarifiers to the Primary
Scrubber Complex will only be replaced to the extents required to make the connections
to the new Primary Scrubber Complex.
c. For design level of effort, assume dual stage chemical scrubbers as the basis
for design.
1.4.4 PROJECT ELEMENT 4 – PRIMARY METERING STRUCTURES
A. The existing primary influent structure consists a confined-space vault structure north of
the existing Headworks 1 and Grit Chamber facilities with an insertion-type flowmeter on each of
the three primary influent pipelines. The meters have been unreliable and are difficult to access
for maintenance. Currently, there is no flow to the eastside clarifiers but Primary Clarifiers 3 and
4 may be placed in operation in the near future until the facilities are demolished. Flow to the
westside clarifiers is calculated based on the sum of influent meters at headworks as well as
additional side stream flows.
B. In order to operate the new eastside clarifiers, reliable flow measurement is required on
the 72-inch primary influent pipe. This project will address the need for flow measurement to the
eastside clarifiers by replacing the flowmeter for the 72-inch primary influent pipe and providing a
new vault structure for maintenance access. The vault structure will include ventilation and
stairway access to eliminate the need for a confined space permit for maintenance.
C. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the
CONSULTANT shall make the following assumptions regarding this project element:
a. Replacement of the flowmeters on the two, 90-inch primary influent pipes is not
part of the scope of work.
b. Additional flow metering may be required for flow control across the eastside
and westside clarifier trains. For design level of effort, assume one flow metering
structure will be required for metering of primary effluent flow on the new primary
effluent pipeline.
1.4.5 PROJECT ELEMENT 5 – ELECTRICAL IMPROVEMENTS
A. Power Building 4 (PB-4) provides power to the Control Center, Lab, Chiller Building,
Vehicle Maintenance Building, Waste Side Stream Pump Station, Shops, and the Primary Odor
Scrubber Complex. The following improvements will be required for PB-4:
1. All existing motor control centers and 12kV load interrupter switches in PB-4 will be
replaced with new 12kV load interrupter switches (one for each 12kV feed and no tie), 480V
switchgear with an automatic transfer scheme, motor control centers, and lighting
transformer and panelboard. Required new equipment and associated appurtenances, such
as battery systems for switchgear control, shall also be provided. Air conditioning will be
added to the PB-4 generator room. The existing oil-filled transformers and associated high
resistance grounding equipment will They be re-used and tied in to the new equipment. The
high resistance grounding equipment shall be relocated as required. Electrical SCADA shall
be provided per OC San design guidelines.
2. The existing standby power generator which serves PB-4 fed loads, will be demolished
and standby power for PB-4 will be provided through a new connection to the standby power
generator in Power Building 8 (PB-8) upon confirmation of adequate spare capacity.
3. Seismic retrofits will be added to the building roof and louvers as identified by PS15-06
to meet current California Building Code (CBC) requirements.
04-02-2020 P1-126 – Design SOW
Page 11 of 61
B. PB-7 provides power to the primary polymer facility, Primary Clarifiers 6-31, and Primary
Clarifiers 3-5. The following improvements will be required for PB-7:
1. Provide new power feeds to the new MCCs associated with new Primary Clarifiers 3-5
and the Primary Odor Scrubber Complex. The original PB-7 design accounted for the
existing Primary Odor Scrubber Complex loads and included two motor control centers
(MCC-SA and MCC-SB) that were never used and it is unclear if conduits were ever
installed. These MCCs will be replaced with new MCCs within PB-7 that will provide power
to the new Primary Odor Scrubber Complex.
C. PB-8 provides power to the trickling filters. The following improvements will be required
for PB-8:
1. Provide standby power feeds to the new PB-4 480V switchgear. The required
modifications to existing PB-8 (electrical and controls) will be performed to accommodate the
new power feeds.
D. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the
CONSULTANT shall make the following assumptions regarding this project element:
a. New 480V switchgear in PB4 will be double-ended switchgear with an
automated transfer scheme. Normal power and standby power sources will be
connected to the new switchgear based on OC San design guidelines.
b. All equipment associated with the PB-4 generator, including batteries, control
panels, day tank, underground storage tank, wiring, piping and associated
appurtenances no longer utilized will be demolished.
c. Relocation of the switchgear in PB-4 will require associated HMI to be relocated
as well. Associated PLC and network equipment will be added and relocated as
necessary.
d. Existing feeds to Control Center, Lab, Chiller Building, Vehicle Maintenance
Building, Waste Side Stream Pump Station, and Shops, which are presently fed from
MCCs-SP and MCC-R, will be re-fed from the new 480V switchgear.
e. New 12kV power distribution will be via new LI switches located in PB-4.
f. New switchgears and MCCs will be arc-rated with the required arc blast exhaust
ducting. Arc-blast ductwork from arc-resistant low voltage switchgear and MCCs will
exhaust inside the room as permitted by manufacturer’s space requirements. Arc-blast
ductwork from arc-resistant medium voltage switchgear will be routed out of the building
and/or electrical rooms to locations that are deemed safe for personnel and avoid
hazardous conditions.
g. Existing cables and conduit associated with the demolished MCCs and
switchgears will be replaced.
h. The new Odor Scrubber Complex will be fed from PB-7 upon confirmation of
adequate spare capacity in the normal and standby modes of operation.
i. The J-47 Cable Tray Improvements at Plant No. 1 Study identified existing
electrical and structural cable tray deficiencies in the Plant No. 1 primary clarifiers area.
For design level of effort, assume that the existing deficient cable trays will be utilized
and modified by this project in all areas except the basement of Power Building 4 and
that the deficiencies identified by Project J-47 will need to be corrected by this project for
the impacted cable trays. Reference Exhibit 26 for details.
j. Seismic retrofits required for PB-4 will be those identified by PS15-06 (listed below)
to mitigate incomplete load path at the north side of the high roof diaphragm.
04-02-2020 P1-126 – Design SOW
Page 12 of 61
(1) Provide concentric x-braced frames at 4 existing 8 ft by 5 ft louvers.
(2) Provide steel framed blocking at the roof level welded to the roof deck. Provide
a new steel member sill anchored to the top of the existing masonry wall with
epoxy anchors.
1.4.6 PROJECT ELEMENT 6 – YARD PIPING
A. Yard piping includes the following:
1. Distribution boxes and junction structures required for primary influent and effluent flow
conveyance including the EBDB, PEJB, PEDB 1, and PEJB-1.
2. Overflow piping from distribution boxes and junction structures listed above.
3. All primary influent piping from existing Primary Influent Metering Structure to eastside
clarifiers.
4. All primary effluent piping from the eastside clarifiers to AS-1 and secondary effluent
piping from Trickling Filters to AS-1.
5. Cengen cooling water discharge piping into PEDB-1 and the Dissolved Air Flotation
Thickeners (DAFT) underflow discharge into PEPS which may need to be relocated to
facilitate the demolition of PEPS.
B. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the
CONSULTANT shall make the following assumptions regarding this project element:
a. All piping, including the primary effluent piping connection to AS-1, will be
replaced and not rehabilitated.
b. The PEJB may be adequate to handle the increased hydraulic head from raising
Primary Clarifiers 3-5. However, the CONSULTANT should assume the structure is
requires replacement to accommodate the new piping connections between the
clarifiers, Trickling Filters, and PEDB-1.
c. New effluent structures must provide for flow control of primary effluent from
Primary Clarifiers 3-5 to AS-1 and to the Trickling Filters. Additionally, new effluent
structures and piping must allow primary effluent from the eastside of Primary Clarifiers
6-31 to be conveyed to AS-1 by flowing past the Trickling Filters and directly into the AS-
1 influent box from the east side. The primary effluent piping to AS-1 will require
replacement of JB-B and JB-C. The existing connection from the Trickling Filter effluent
box to AS-1 will discharge to new PEDB-1 overflow because the effluent weir is lower
than the AS-1 influent weirs.
d. For design level of effort, CONSULTANT shall perform analysis to determine if
DAFT underflows, Cengen Cooling and associated drainage in that part of the plant can
be redirected by gravity to AS-1 or by gravity to the plant drain system tributary to the
sidestream waste pump station. If determined feasible, effort includes development of a
recommendation and design. Design of a lift station solution or modifications to existing
sump pump pumping/piping is not included.
e. Replacement of the primary effluent piping connection to AS-1 will require
relocation of the transformers for the blower building and PEPS as well as the CNG
facilities.
f. Improvements to the westside clarifiers and primary effluent structures are not
included in this scope.
04-02-2020 P1-126 – Design SOW
Page 13 of 61
g. The connection into AS-1 will terminate upstream of the AS-1 eastside influent
flowmeter isolation valve.
1.4.7 PROJECT ELEMENT 7 – UTILITIES & MISCELLANEOUS ITEMS
A. Utility system connections required for the new eastside clarifier facilities include:
1. Electrical power distribution and controls
2. Water, air, and drains
3. Chemical feed piping from existing Primary Polymer Facility
4. HVAC, fire alarm, fiber and communications, telephone, public address system, access
control and security cameras
5. Utility relocations required for construction of the new facilities
6. New Primary Sludge pipeline (PS 3) from Primary Clarifiers 3-5 to solids process
through Tunnels 12, 13, and 9
7. Tunnel 12 modifications
8. Grading, paving, and storm water drainage
The project boundary in Figure 1 shows the general extents of utility systems.
1.4.8 TEMPORARY FACILITIES DURING CONSTRUCTION
A. In certain cases, construction sequencing constraints may require the contractor to construct
a temporary facility to be used during a certain portion of the construction period.
CONSULTANT shall identify in what instances such facilities are required or reasonably
warranted and present those instances with implementation plans and construction sequencing
constraints to OC San for consideration. When such facilities are found to be either required or
reasonably warranted, CONSULTANT shall provide sufficiently detailed drawings and
specifications to be included in the Bid Documents that bidders understand what is required to
provide and potentially operate the temporary facilities and that the reliability and performance of
the facilities will meet OC San’s needs and reasonably mitigate construction risks. Examples of
potential facilities include:
1. Temporary MCCs and power feeds from existing MCCs
2. Temporary piping to phase the replacement of the utilities in the tunnels
3. Bypass pumping to rehabilitate process structures
4. Temporary standby power to accommodate the transfer of electrical loads from existing
electrical equipment to new electrical equipment and the phasing of the electrical system
from the existing standby power electrical distribution equipment to the new equipment.
5. Temporary piping to re-route side stream flows from PEPS including the 12-inch Central
Power Generation cooling water discharge into PEDB-1 and the DAFT underflows.
6. Temporary facilities for commissioning
1.4.9 COORDINATION WITH OTHER PROJECTS
A. The following projects may impact or require coordination with this project:
1. P1-105, Headworks Rehabilitation at Plant No. 1. This project will rehabilitate and
upgrade Plant No. 1 Headworks. Major facilities to be rehabilitated include the Metering and
Diversion Structure, the Bar Screen Building, the Bin Loading Building, the Main Sewage
04-02-2020 P1-126 – Design SOW
Page 14 of 61
Pump Station, the Grit Basins, the Primary Influent channels, the Headworks Odor Control
Scrubbers, and electrical power distribution and control systems. New structures to be
constructed as part of this project include Grit Pump Station, Grit Handling Building,
Headworks Odor Control Facility, Electrical Buildings, and other support systems.
2. P1-132, Uninterruptible Power Supply Improvements at Plant 1. This project will
provide a new regional Uninterruptible Power Supply (UPS) at Power Building 8 to provide
critical power to facilities in the northwest region of Plant No. 1. New electrical distribution
and branch circuit panelboards will replace existing old and obsolete equipment. The project
will provide temporary power to maintain services to critical loads during construction.
Miscellaneous 480-volt cables and circuit breakers will also be replaced.
3. P1-133, Primary Sedimentation Basins No. 6-31. This project will increase the
reliability of the rectangular primary clarifiers at Plant No. 1 by replacing three primary sludge
pumps, replacing the launders in the Primary Influent Splitter Box, and installing a sump
pump to remove water accumulation in a below-grade foul air pipe.
4. P1-140, Activated Sludge-1 and Secondary Clarifier Rehabilitation. This project will
perform a comprehensive rehabilitation of the Activated Sludge Facility No. 1 at Plant No. 1.
The facilities in this project include Blower Building No. 1, Aeration Basins Nos. 1-10, Return
Activated Sludge Pump Station and Secondary Clarifiers Nos. 1-26. A new Mixed Liquor
Recycle (MLR) pump station and associated piping is also included in this project.
5. P2-133, B/C-Side Primary Sedimentation Basins Rehabilitation at Plant No. 2. This
project will extensively rehabilitate B & C Sides of primary basins at Plant 2 to extend uselife
by another 40 years. The work will rehabilitate 10 primary basins with new flat covers;
rehabilitate sludge/ scum pump stations; rehabilitate distribution structure B & C; replace all
mechanical and electrical systems; replace polymer system; rehabilitate structural and yard
piping; replace North Scrubber Complex; relocate electrical and controls to Distribution
Center F; and miscellaneous upgrades.
6. J-124 Digester Gas Facilities Replacement. This project will replace the low and high
pressure digester gas facilities at Plant No. 1 and No. 2 to meet current and future needs
such as projected gas production and Air Quality Management District and National Fire
Protection Association regulations. The Plant No. 1 work includes replacement of all
compressors and flares and rehabilitation of the existing gas compressor building. The Plant
No. 2 work includes construction of a new gas compressor building, and replacement of the
flares and gas compressors.
7. J-133 Laboratory Rehabilitation at Plant No. 1. This project will rehabilitate the
existing Laboratory building at Plant No. 1 to meet current building, electrical and safety
codes and to incorporate recommendations from the Seismic Evaluation Study. Amenities,
utilities, and equipment will be upgraded and working spaces will be re-purposed and
optimized to meet the existing needs of the Laboratory. This project also includes temporary
Laboratory service relocations since it will need to be shut down during rehabilitation.
8. J-136 Power Building Structural Seismic Improvements at Plant No. 1 and 2. The
buildings at Plant No. 1 and 2 that house electrical systems will undergo structural and
geotechnical (soil) improvements to reduce the risk of failure during a significant seismic
event. At Plant No. 1, this includes the 12 kV Service Center, Central Power Generation, and
Power Buildings 2 and 4. At Plant No. 2, this includes the Boiler Building, Headworks Power,
Headworks Standby Power, Central Power Generation, and Power Buildings B, C, D.
DESIGN CONSIDERATIONS
The following design considerations shall be carried from Preliminary Design through Final Design.
1.5.1 TECHNOLOGY AND CONFIGURATION CHOICES
1.5
04-02-2020 P1-126 – Design SOW
Page 15 of 61
The project elements in this facility shall be achieved using proven technologies. Alternative means of
accomplishing the project elements must be reviewed and accepted by OC San prior to detailed
evaluation. All alternative technologies proposed should be currently operating in other wastewater
treatment facilities of similar capacity.
1.5.2 DESIGN DECISIONS
Design decisions shall be agreed upon by OC San prior to any work being performed by the
CONSULTANT in preliminary and detailed design. All design decisions shall be documented.
1.5.3 DESIGN SELECTION CRITERIA
A. Design selection shall consider construction, lifecycle, operation, and maintenance costs as
well as process benefits and overall quality. When design recommendations are presented to
OC San, the design selection criteria shall be clearly identified with the recommendation.
B. The cost estimate shall consist of a life cycle cost analysis for the options proposed,
including costs for engineering, construction, start-up, and operational and maintenance, and
future rehabilitation and replacement.
C. The construction cost estimate shall be as described in Engineering Design Guidelines
Section 01.4.6 included as Exhibit 16 - OC San Engineering Design Guidelines and
Standards – Available online at https://www.OC San.com/about-
us/transparency/document-central/-folder-917. Life cycle cost analysis is described in Section
01.2.19 of the Guidelines.
1.5.4 PROJECT ELEMENT DESCRIPTION REVISIONS
CONSULTANT shall review and revise the Project Element Descriptions using track changes at the end
of Preliminary Design and at each design submittal. Changes shall be submitted to OC San for review.
1.5.5 COST MODEL
A. CONSULTANT shall prepare the cost model to be used to demonstrate the true cost of
major project decisions. With each major project decision, the CONSULTANT shall review and
update the cost model. The cost model shall be a living document between the CONSULTANT
and OC San to ensure that all changes are being acknowledged in the overall project cost.
B. The cost model shall show the implications of the decisions on the life cycle costs and shall
be used in the decision-making process. After decisions are made, the updated construction
costs, and life cycle costs, shall be submitted for project records.
C. The cost model shall be used to track project changes through final design.
D. The construction cost estimate shall be as described in Engineering Design Guidelines
Section 01.4.6 included as Exhibit 16 - OC San Engineering Design Guidelines and
Standards – Available online at https://www.OC San.com/about-
us/transparency/document-central/-folder-917.
PROJECT SCHEDULE
1.6.1 GENERAL
A. The table below lists the time frames associated with each major project deliverable and with
OC San’s review and approval of those deliverables. CONSULTANT shall comply with the
deadlines indicated in that table.
B. OC San’s Project Manager will issue an Administrative Notice to Proceed (NTP) that will
authorize CONSULTANT to begin preparation of the Project Management Plan (PMP) as
defined in Exhibit 3 – Project Management Requirements. The Administrative NTP does not
authorize costs to be incurred for execution of the technical portion of the Work, except where
specifically noted in the Administrative NTP.
1.6
04-02-2020 P1-126 – Design SOW
Page 16 of 61
C. Following OC San’s acceptance of the PMP, OC San’s Project Manager will issue a
Preliminary Design NTP. OC San’s Project Manager will also issue a Final Design NTP upon
OC San’s acceptance of the final Preliminary Design Report.
D. The time frames specified below are used to estimate the actual milestone dates based on
the assumed NTP date, as shown in Exhibit 7 - Project Schedule Calculation.
E. OC San will consider an alternative CONSULTANT-proposed schedule provided it is
consistent with OC San resources and schedule constraints and adds value to OC San.
PROJECT MILESTONE AND DEADLINES
MILESTONE DEADLINE
Submit Project Management
Plan (PMP)
10 workdays from Administrative NTP.
OC San Review of PMP
5 working days from receipt of PMP. If the PMP is sufficient, the OC
San PM will set the date for the Kickoff Meeting. In any case,
CONSULTANT shall issue a revised PMP within 5 working days of
receipt of OC San’s comments for OC San approval.
Kickoff Meeting The kickoff meeting will be scheduled to coincide with the Preliminary
Design NTP.
Preliminary Design NTP
Submit draft Preliminary
Design Report (PDR)
375 workdays from the Preliminary Design NTP. CONSULTANT shall
establish a schedule with the OC San PM for separately submitting
working drafts of each Design Memo for OC San review prior to
completing the draft PDR. This schedule shall factor in the logical
sequence for completing the memos as well as both CONSULTANT
and OC San resources.
OC San Review of draft
PDR
25 workdays from receipt of Draft PDR
Submit final Preliminary
Design Report
50 workdays from receipt of OC San comments on Draft PDR.
Final Design
NTP
CONSULTANT’s schedule shall allow 20 working days from submittal
of the final PDR to receipt of the Design Phase NTP.
Submit Design Submittal 1
(DS1)
100 workdays from Design Phase NTP.
OC San Review of DS1 20 workdays from receipt of DS1
Submit Design Submittal 2
(DS2)
100 workdays from receipt of OC San comments on DS1.
OC San Review of DS2 20 workdays from receipt of DS2
Submit Design Submittal 3
(DS3)
135 workdays from receipt of OC San comments on DS2.
OC San Review of DS3 25 workdays from receipt of DS3
Submit Final Design
Submittal (FDS)
60 workdays from receipt of OC San comments on DS3.
CONSULTANT shall stop work upon submission of DS3, except as
required to participate in OC San meetings, until receipt of OC San
comments on DS3.
OC San Review of FDS 20 workdays from receipt of FDS
Final Technical
Specifications and Plans
20 workdays from receipt of OC San comments on FDS.
2. PHASE 2 – PRELIMINARY DESIGN
04-02-2020 P1-126 – Design SOW
Page 17 of 61
The preliminary design phase will define the project. The final deliverable of this phase will be a
Preliminary Design Report (PDR) with the basis of design for all elements of the project.
PRELIMINARY DESIGN EXECUTION
2.0.1 PRELIMINARY DESIGN DECISION PLAN (PDDP)
A. CONSULTANT shall prepare a Preliminary Design Decision Plan (PDDP) for how project-
specific decisions will be properly planned and scheduled such that:
1. The work is planned to meet the specified schedule while providing appropriate
opportunities for OC San input.
2. OC San input is planned with appropriate timing to ensure a high-quality final product.
3. Specific major decisions are made in a timely manner by the project team and project
stakeholders and do not impact the project schedule.
4. Workshops and meetings are scheduled at the start of the project to ensure maximum
participation.
B. The PDDP shall include, at a minimum the following information:
1. A list of major project decision that need to be made.
2. Discussion of how major decisions will be made on the project (utilizing a decision tree
as appropriate), and the process to gain OC San concurrence.
3. Summary and timing of major decisions to fit the project schedule.
4. List of workshops, technical design meetings and focused meetings where major
decisions will be made, date of workshop or meeting, and the list of required attendees.
5. Schedule for all workshops, technical design meetings, and focus meetings and list of
anticipated attendees.
C. The PDDP shall be developed by the CONSULTANT and submitted for OC San review.
CONSULTANT shall make the appropriate revisions and submit the final version for use as the
basis for execution.
PRELIMINARY DESIGN PRODUCTION
2.1.1 GENERAL
A. Preliminary Design Report (PDR) production involves the preparation of design memos,
drawings, calculations, and other supporting material resulting in the PDR.
2.1.2 DESIGN MEMOS
A. The CONSULTANT shall produce Design Memos as indicated below in accordance with
Error! Reference source not found.. The CONSULTANT shall discuss the combining of design
memos with OC San and develop a design memo submittal list.
☒Process Design Configuration
☒Design Configuration
☒Redundancy
☒Monitoring and Sampling
☒Process Flow Diagrams
☒Operating Philosophies
☒Site and Facility Layouts
☒Preliminary Load Criticality Ranking Table
☒Hydraulic Analysis
☒Hydraulic Analysis
2.0
2.1
04-02-2020 P1-126 – Design SOW
Page 18 of 61
☒Hydraulic Profile
Requirements for Hydraulic Analysis design memo are in addition to project specific
Design Memo for Plant No . 1 Hydraulic Model Update below. Design memos may be
combined.
☒Demolition
☒Describe Demolition Requirements
☒Demolition List
☒Demolition Plans
☒Demo EID
☒Rehabilitation Requirements
☒Geotechnical Data Report
☐Review of Existing Data - Preliminary Geotechnical Report
☒Geotechnical Data Report and Recommendations
☒Civil Design Parameters
☒General Civil
☒Drainage Requirements
☒Corrosion Protection Requirements
☒Utility Requirements
☒Structural Design Parameters
☒Architectural Design Parameters
Note: Develop up to three alternative concepts for review and acceptance
☒Process Mechanical Design Parameters
☒Building Mechanical Design Parameters
☒Fire Protection
☒Fire Protection Requirements
☒Fire Water Flow Analysis
☒Fire Protection Requirements for Existing Facilities
☒Electrical
☒Codes/standards.
☒ Brief description of electrical system.
CONSULTANT shall evaluate the location of the MCCs for the Primary Odor Scrubber
Complex. The evaluation shall include the following:
· Available spare capacity in PB-7 (normal and standby power)
· Available spare capacity in PB-4 (normal and standby power)
· Feasibility of routing new conduits from the new MCCs (located in ether PB-4 or
PB-7) to the Primary Odor Scrubber Complex
· Construction sequencing of the cut-over work
☒ Electrical drawings.
☒Identify Electrical System Impacts
☒Report – Data Collection and Verification
☒Preliminary Load List
☒Preliminary Standby Power Requirements
☐ETAP – Preliminary Short Circuit Analysis and Load Flow/Voltage Drop Studies
☒ETAP – Provide Data. OC San will perform ETAP studies.
☒Preliminary Analysis for cable pull calcs, ductbank cable derating, cable tray fill calcs.
☒Hazardous Area Classification Requirements
☒Instrumentation and Control
☒Instrumentation and Control System
☒Specialty Safety Systems
☒Preliminary SAT
04-02-2020 P1-126 – Design SOW
Page 19 of 61
☒PLC and RIO Panel Location Map
☒CCTV Coverage Map
☐Landscaping
☐Landscaping Requirements
☐Develop up to three alternative concepts for review and acceptance
☒Plant Utility Investigation Findings
☐Vibration Analysis
☐Collections Basis of Design
☐Codes and Standards
☐Hydraulic Analysis
☐Pipeline Basis of Design
☐Manhole Basis of Design
☐Hydraulic Profiles
☐Collections Rehabilitation Alternatives
☐Pipeline Rehabilitation
☐Manhole Rehabilitation
☐Collections Pipeline Design
Assume 3 viable alignment options
☐Design Memo Items 1-12
☐Open-cut vs. Trenchless Technologies
☐Trenchless Technologies at Major Closings
☐Collections Utility Investigation Findings
☐Collections Conceptual Traffic Control
☐AHJ and Traffic Control Identification
☐Basis for Traffic Control Strategy
☐Traffic Analysis
☐Traffic Control Plans
☒Design Safety Requirements
☒Design Safety Requirements
☒Identify all potential project specific safety issues
☒Identify all potential Cal OSHA and OC San safety issues
☒Identify construction safety hazards
☒Use Sample Full Project Safety Review Plan to verify safety elements
☒Risk Management Check List to verify safety elements
☐HAZOP
☒Public Impacts
The scope of this section is limited to identification of potential public impacts and
mitigation measures. Public outreach plan and execution will be handled by OC San.
Environmental and Regulatory Requirements
☐CEQA Part of Programmatic EIR
☒CEQA work consists of a Notice of Exemption (NOE) since the project is replacing existing
facilities and not expanding capacity. The NOE will be filled by OC San.
☐Determine project environmental and regulatory requirements
☐Matrix of CEQA and Permit Requirements
☐Mitigation, Monitoring and Reporting List
☒Permit Requirements
☒List of Permits Required
☐Oil Well Abandonment
☒Stormwater Requirements
☒Hazardous Material Survey, Mitigation and Control
04-02-2020 P1-126 – Design SOW
Page 20 of 61
In addition to the requirements for assessment of asbestos and lead in Exhibit 1,
disposal of the existing nuclear density meters in the Primary Clarifiers 1-5 pump rooms
must be addressed as well.
☒Maintainability
☒Define Maintainability Requirements
☒Maintainability Requirements Plan Drawings
☒Define Maintainability Rules
☒Define Maintainability Information for Project Specific Equipment
☒Facility Operation and Maintenance
☒Facility O&M Requirements
☒Operating Philosophies
☐Preliminary Assessment of O&M Staffing Requirements
☒Implementation Plan
☒Identification of Adjacent Projects and Potential Project Interdependencies
☒Preliminary Commissioning Package List
☒Preliminary Construction Sequencing Plan
☒Review of Constructability Issues
☒Temporary Handling of Flow
In addition to the requirements in Exhibit 1, this design memo shall also address the
hydraulic risks associated the long term outage of the eastside clarifiers during
construction.
☒Construction Odor Monitoring and Mitigation
☒Preliminary Technical Specification List
2.1.3 PROJECT SPECIFIC DESIGN MEMOS
Preparation of the following project specific Design Memos is required as part of preliminary
design activities. The content of these Design Memos are further described under the
corresponding Preliminary Design Activities tasks.
1. Plant No. 1 Hydraulic Model Update
2. Condition Assessment
3. Primary Odor Scrubber Complex Condition Assessment
4. Primary Odor Scrubber Complex Rehabilitation and Replacement
5. Primary Effluent Pipeline Configurations
2.1.4 PRELIMINARY DESIGN DRAWINGS
A. The CONSULTANT shall produce the following Preliminary Design Report drawings in
accordance with Error! Reference source not found..
☒General
☒Demolition
☒Civil
☐Landscape
☒Structural
☒Architectural
☒Mechanical
☒Electrical
☒Instrumentation and Control
2.1.5 PRELIMINARY DESIGN REPORT (PDR) PRODUCTION, CONTENTS AND ORGANIZATION
04-02-2020 P1-126 – Design SOW
Page 21 of 61
A. Preliminary Design Report (PDR) Production involves the preparation of design memos,
drawings, calculations, and other supporting material resulting in the PDR.
B. The CONSULTANT shall combine the materials described below into a draft PDR. The
PDR shall be structured as outlined below, with the contents corresponding to the tasks listed in
this Scope of Work.
Volume 1 – Preliminary Design Report Technical Memos
Executive Summary
Design Memos
Design Memo 1, 2, 3, etc.
List of Proposed Specification Sections
Volume 2 – Drawings (see Preliminary Design Drawings list below)
Volume 3 – Submittal Documentation
Calculations
Equipment Data & Catalog Cuts
Decision Log
Meeting Minutes
C. The Executive Summary shall summarize the conclusions of the Memos included in the
report, and specifically include a summary construction schedule and construction cost estimate.
D. The draft PDR and final PDR shall be submitted in searchable PDF format legible on-screen
and as a hard copy. The number of hard copies is indicated in Exhibit 8 - Deliverables
Quantities. The labeling and organization of the PDF submittal shall be in accordance with
Exhibit 13 - Bluebeam Designer Training for Submission.
E. Each evaluation memo and design memo shall be a separate file.
F. The OC San Project Manager may request that the CONSULTANT submit an electronic
proof set of the Draft PDR and Final PDR prior to hard copy production in order to initially
confirm that the submittal is ready for printing.
2.1.6 PRELIMINARY DESIGN COST ESTIMATE
A. The CONSULTANT shall provide a cost estimate for the associated PDR submittal indicated
below in accordance with Error! Reference source not found..
PRELIMINARY DESIGN ACTIVITIES
The following services shall be provided by the CONSULTANT or an appropriately qualified
subconsultant. In any case, the CONSULTANT shall be responsible for managing all subconsultants,
including reviewing their work products prior to submission to OC San.
2.2.1 PLANT NO. 1 HYDRAULIC MODEL UPDATE
A. The consultant shall provide engineering and hydraulic modeling services to update the
Plant No. 1 hydraulic model. The updated model will represent the changed conditions of Plant
No. 1 after elimination of the PEPS facility and increasing the elevation of the effluent weirs of
the eastside clarifiers to allow gravity flow of primary effluent into AS-1. The model will be used
as a planning tool to demonstrate modes of operation under various flow conditions and to
simulate the modified hydraulics.
1. Update Hydraulic Model Datum
a. The existing hydraulic model is based on plant datum. Perform field surveys of key
hydraulic structures to update hydraulic model elements to NAVD 88 datum. Surveys
shall be limited to top of concrete structure and weir elevations only. All other elevations
in the hydraulic model will be adjusted relative to top of structures. Using the current
hydraulic model which has previously been calibrated as part of PS17-09, update model
elements to NAVD 88 elevations with results from field surveys. Provide update of
hydraulic model reference files from SP-173 with markup of all changed elevations.
2.2
04-02-2020 P1-126 – Design SOW
Page 22 of 61
b. Incorporate changes made by Project No. P1-105 pumps, grit channels, grit
chambers, headworks splitter box and primary influent piping into hydraulic model.
2. P1 Primary Influent and Effluent Hydraulic Improvements
a. The hydraulic model is calibrated to represent the system under peak flow
conditions and requires additional adjustments to settings to simulate average day
operating conditions. Real Time Controls (RTC’s) are utilized in the model to allow for
alternatives analysis. CONSULTANT shall add and modify settings and controls as
necessary to develop the flow scenarios required.
b. CONSULTANT shall develop hydraulic model scenarios to identify capacity issues
and system bottlenecks in the primary influent and effluent conveyance processes.
Identify potential system improvements (for example, changes to weir elevations and
overflows, variable flow control, or larger pipe sizes) to address these issues. At a
minimum, address:
(1) Options for mitigating risks associated with peak wet weather flow during
construction of P1-126 including potential options for conveyance of the full
320 mgd peak flows through Primary Clarifiers 6-31 with the 72-inch primary
influent pipeline offline.
(2) Hydraulic limitations at PEDB-1 which contribute to potential overflow issues
when primary effluent from Primary Clarifiers 6-31 are conveyed to the Trickling
Filters and to AS-1 splitter box from the east side.
(3) Hydraulic limitations at PEDB-2 during high flows identified by SP-173
(4) Potential for flow routing to the Trickling Filter to attenuate high flows or overflow
conditions at PEDB-1 and PEDB-2.
(5) Improvements to reduce potential for primary effluent overflows or to allow for
increased response time to a potential overflow event.
(6) Other hydraulic system limitations identified in SP-173, PS17-09, P1-126
Concept Report, and PS19-02.
(7) Flow conveyance through the eastside clarifiers with only two clarifiers in
service.
3. Updated P1 Hydraulic Model
(1) Develop final hydraulic model scenarios representing the improved conditions
as determined by the preliminary design. CONSULTANT shall also update the
hydraulic model again after final design to reflect any changes made during
design.
(2) The hydraulic model must be updated within the existing modelling software
platform, Infoworks ICM. Updated model functionality, spatial alignment and
representation, hydraulic element naming conventions, and level of detail must
be consistent with the existing model.
(3) The final hydraulic model must include scenarios for dynamic peak wet weather
and average day flow scenarios under the existing and improved conditions.
(4) Develop and describe the hydraulic profile for the new facilities. See
Engineering Design Guidelines, Appendix A, Section A.2.6 “Hydraulic Profile”
for requirements. Describe modifications or improvements required to resolve
these impacts.
(5) The existing hydraulic model master database contains both Plant 1 and Plant
2. Updates to Plant 2 hydraulic model are not required. CONSULTANT may
utilize boundary conditions to isolate the P2 from the P1 system. However, final
04-02-2020 P1-126 – Design SOW
Page 23 of 61
hydraulic model must include one single master database model which includes
both plants.
(6) Perform a calibration check based on available data related to PEDB-2.
(7) Review loss coefficients for P1 related to facilities critical to the project.
(8) Validate the critical portions of the system against calculations performed in
Visual Hydraulics.
(9) Conduct a sensitivity analysis of the model.
B. CONSULTANT shall hold workshops, technical progress meetings, and focused meetings
as necessary to obtain input from OC San staff to update the model, develop model scenarios,
validate and present the model results, and provide recommendations for hydraulic system
improvements and design criteria for the new eastside clarifier facilities.
C. This task shall be documented under the corresponding Project Specific Design Memo.
2.2.2 CONDITION ASSESSMENT
A. CONSULTANT shall conduct a field inspection and prepare a Condition Assessment Report
including remedial recommendations for the facilities listed below.
1. 72-inch primary influent piping from the Primary Influent Metering Structure to the EBDB.
2. 66-inch overflow piping from PEDB-1 to PEJB-1
3. PEJB-1 structure
4. 72-inch primary effluent connection to AS-1 from PEPS
B. The condition assessment will require a manned entry inspection and core samples to be
collected from the pipelines. CONSULTANT shall provide all personnel and equipment required
for confined entry and inspection.
C. Existing condition assessment CCTV video data is available for the above facilities except
for the 72-inch primary effluent pipe between PEPS and AS-1. The CONSULTANT shall
coordinate a shutdown with OC San to inspect this facility, all other facilities are not anticipated
to require process shutdowns for inspection. CONSULTANT shall submit inspection plan within
one month of NTP. Based upon the hydraulic analysis and condition assessment data,
CONSULTANT shall provide recommendations for rehabilitation or replacement of these assets.
If the facilities must be replaced based on hydraulic criteria, a condition assessment may not be
necessary.
D. This task shall be documented under the corresponding Project Specific Design Memo.
2.2.3 PRIMARY ODOR SCRUBBER COMPLEX CONDITION ASSESSMENT
A. CONSULTANT shall conduct a field inspection of the existing Primary Odor Scrubber
Complex. The assessment will evaluate the feasibility of reusing the following either wholly or
separately; 1) the electrical and instrumentation components of the facility including motors,
instruments, wiring, conduits and tray cables, control panels, and MCC’s, 2) blower fans, foul air
valves and dampers, 3) chemical feed equipment including tanks and pumps, and 4) scrubber
vessels. Structural components shall be considered not necessary for replacement unless
required for replacement of other components.
B. A Technical Memorandum shall be prepared which describes the findings of the field
assessment and presents those components that are proposed to be reused and those
components which are recommended for replacement.
C. Based on the assessment findings and recommendations for component rehabilitation or
replacement, a comparison of single stage versus dual stage scrubber technology approaches
will be developed and presented. This evaluation will incorporate data from the OC San Odor
Control Master Plan, input from CONSULTANT’s odor control specialists, and OC San staff input
04-02-2020 P1-126 – Design SOW
Page 24 of 61
and experience with operating existing odor control systems. The capacity of existing scrubber
assets will also be compared against preliminary expected capacity requirements.
D. Based on the feedback from the third Scrubber Assessment Workshop described as part of
2.3.4, a decision on the selected scrubber technology will be written into the final draft of the
Memorandum.
E. The Primary Odor Scrubber Complex Condition Assessment shall be completed prior to start
the Primary Odor Scrubber Complex Rehabilitation and Replacement task. It is anticipated that
this task shall be completed within 90 working days after Preliminary Design NTP. An
allowance of 260 hours is anticipated to complete the task.
2.2.4 PRIMARY ODOR SCRUBBER COMPLEX REHABILITATION AND REPLACEMENT
A. Based on the decisions made as part of the Primary Odor Scrubber Complex Condition
Assessment task, CONSULTANT shall develop a preliminary design of the Primary Odor
Scrubber Complex which may include the following:
1. CONSULTANT shall conduct odor sampling at the primary clarifiers to determine if
additional odor constituents require treatment and to establish design criteria.
2. Address the feasibility of adding future capacity to the new Primary Odor Scrubber
Complex to handle odor treatment requirements for future primary clarifiers and the Trickling
Filters so that all primary foul air and foul air from the Trickling Filters can be treated by a
single system.
B. At a minimum, the development of the preliminary design of the Primary Odor Scrubber
Complex shall include:
1. Identify primary foul air treatment requirements, layout and configuration requirements,
permitting requirements, capital and operating costs, and O&M considerations for the
selected scrubber technology.
C. This task shall be documented under the corresponding Project Specific Design Memo.
2.2.5 PRIMARY EFFLUENT PIPELINE CONFIGURATIONS
A. The primary effluent connection to AS-1 involves significant operational and constructability
challenges due to the elimination of PEPS, existing drain connections to PEPS, potential need to
upsize the existing AS-1 connection pipe size, the presence of existing facilities including
Tunnels 18 and 19, the PEPS wet well, the Compressed Natural Gas Building, and transformers
serving the PEPS/Blower Building. CONSULTANT shall consider condition assessment,
hydraulic analysis, constructability, operational, and other design factors to provide a
recommended configuration of the new primary effluent pipelines and structures from the new
clarifiers to PEJB and to the final connection at AS-1.
B. The results of this task will be incorporated into the Process Design Configuration Design
Memos.
2.2.6 PRIMARY METERING STRUCTURE
A. Flow metering technology will be selected during Preliminary Design and may include
magnetic flowmeters, ultrasonic, sonar, or other technologies recommended by CONSULTANT.
OC San is in the process of pilot testing an externally mounted probe flowmeter on the existing
72-inch pipeline. The CONSULTANT will coordinate with OC San on pilot testing efforts and
incorporate the results from pilot testing efforts into the recommendations of a flowmeter
technology for implementation. Coordination during pilot testing efforts will be limited to
recommendations for technologies to be tested by OC San, review of pilot study results, and
evaluation of the applicability of the tested technologies to the project.
04-02-2020 P1-126 – Design SOW
Page 25 of 61
B. Evaluate the need for replacement of the flowmeters on the two 90-inch primary influent
pipes along with the instrumentation requirements for flow control across the two eastside and
westside clarifier trains.
C. The results of this task will be incorporated into the Process Design Configuration Memos.
2.2.7 EASEMENTS, PROPERTY BOUNDARIES AND WORK AREA LIMITS
A. Consultant shall show and explicitly identify the limits of work for all portions of the project,
including any restrictions to the work allowed in any area, e.g., whether the area can be used for
parking or laydown.
B. All survey research and survey field work shall be performed by a Professional Land
Surveyor licensed by the State of California.
2.2.8 TOPOGRAPHIC SURVEY
A. CONSULTANT shall conduct field and aerial surveys as required. Topographic information
used on the construction plans shall be generated from a field survey and an aerial mapping
process. OC San will not provide the aerial survey information to the CONSULTANT for use on
the project.
B. Prior to beginning design, CONSULTANT shall prepare the scope of work for field and aerial
surveys required for all applicable project elements. OC San will establish both vertical and
horizontal control for the project. The field survey shall be used to establish both horizontal and
vertical alignment of the facilities and shall note all survey monuments, topographic features,
property lines, and elevations. The basis of bearings and benchmarks shall be indicated on the
drawings. Control shall meet or exceed NGVD 88 requirements and shall be based on the Plant
Local Coordinate System and datum. CONSULTANT’s project schedule shall account for the
above.
C. The aerial topography shall be required to meet the following criteria:
1. The final product shall be delivered in AutoCAD.
2. The aerial shall be based on the plant coordinate system.
3. The CAD file shall adhere to the CAD Manual. OC San shall be given the opportunity to
review and comment on the compliance to the CAD Manual.
4. Site contours shall be in 0.5-foot intervals.
5. Contour and spot elevations shall be 3D; all other features shall be 2D.
6. CONSULTANT shall include the survey-related documents with the Design Support
Documentation portion of the Design Submittals as specified in the Engineering Design
Guidelines, Appendix A, Section A.3.19 “Project Support Documentation (PDS)”.
2.2.9 GEOTECHNICAL INVESTIGATION
A. CONSULTANT shall secure the services of a qualified Geotechnical Engineering firm to
prepare a Geotechnical Data Report that addresses geotechnical concerns for all applicable
Project Elements of the project Scope of Work
B. Soil Explorations
1. The geotechnical services shall include exploratory work such as soil borings and/or
cone penetration tests (CPT’s) necessary to observe, test, classify soils, and monitor
groundwater levels and potential groundwater pollutants of concern.
2. The number and spacing of borings shall be based on the geotechnical professional’s
interpretation of needs and recommendation; however, a maximum of five hundred feet
(500’) shall be allowed between pipeline alignment borings along a pipeline alignment.
04-02-2020 P1-126 – Design SOW
Page 26 of 61
a. If unexpected or unique soils are encountered, an adequate number of borings shall
be taken to try and define the limits of the anomaly.
3. Borings shall also be taken at or near the upstream and downstream connection points
for the proposed facility.
4. The depth of the borings shall be adequate to characterize the soils to a depth of at least
five feet below the bottom of an excavation or any proposed sewer invert elevation. At least
two borings shall extend ten (10) feet below the proposed excavation bottom or sewer invert.
C. Soil Sampling
1. Soil samples for testing shall be collected as needed based upon CONSULTANT’s
professional judgment. However, samples intervals shall not exceed two-foot depth intervals
alternating SPT and RING samples in each boring. If borings are taken near existing
sewers, samples shall be taken and delivered to OC San for testing for coliforms to
determine if sewers are leaking.
D. Ground Water Pump Testing
1. Conduct ground water pump testing to determine dewatering parameters for inclusion of
the specifications.
2. Provide a complete specification for the abandonment of wells for areas where aquifers
could be compromised. Potential abandonment methods for deep penetrations might
consist of overdrilling and fill with cement-bentonite grout slurry, or deep pressure grouting to
create a concrete seal.
E. Soil Exploration Locations
1. The location of all soil explorations shall be plotted on a map and attached to the
Geotechnical Report. Preferably, the explorations shall include survey coordinates
consistent with the project survey. Complete logs of the soil profiles shall be included in the
report.
2. Explorations shall be located strategically within the footprint of the proposed excavation
or on the centerline of proposed pipeline alignments. A total of five borings shall be cased
and converted into water level monitoring wells for use during construction according to local
agency requirements. CONSULTANT shall obtain all necessary permits for the installation of
monitoring wells. CONSULTANT shall also be responsible for abandoning the wells after
the construction is completed and the monitoring wells are no longer useful.
3. Work conducted within OC San’s treatment plants shall comply with the requirements of
the OC San Stormwater Management Plan. Work conducted outside OC San’s treatment
plant shall comply with the requirements of the local jurisdiction.
2.2.10 UTILITY INVESTIGATION
A. To better manage the risks associated with construction excavation, CONSULTANT shall
perform a thorough search of all utilities impacted by the work for all applicable Project Elements
of this Scope of Work, regardless of size and all other facilities above or below ground. Utilities
include all in-plant, utility company-owned and public agency-owned piping, duct banks, and
other interferences. The search shall include utilities within the public right-of-way, and those
located on private property and OC San property impacted by the proposed project. The search
shall include the records and plans of OC San and all respective public and private companies
and utilities.
B. Review of OC San Records
1. OC San’s “As-built/Record” plans may be incomplete or inaccurate with respect to the
routing of individual utilities, pipelines, etc. in the vicinity of the project. CONSULTANT shall
check OC San records against those of the other agencies, companies and utilities. These
may include, but not be limited to, oil, gas, fuel, water, and sewer pipelines; traffic control
04-02-2020 P1-126 – Design SOW
Page 27 of 61
facilities, telephone and electrical conduit and duct banks, storm drains, manholes, and other
structures.
C. On-Site Inspection
1. An on-site inspection shall be made in the project area. During the on-site inspection, a
senior-level CONSULTANT representative shall walk the site accompanied by OC San’s
Project Engineer and Supervising Inspector. The CONSULTANT representative shall be
experienced in the location and identification of utilities in the field. During the on-site
inspection the CONSULTANT shall document all visible features that indicate utilities within
the project area and compare them with the available utility plans.
D. Subsurface Utility Investigations
1. Investigation of existing utilities shall be in accordance with the respective ASCE
guidelines, except as amended by this Scope of Work. A brief description of the ASCE
guidelines defines the Quality Level of detail for researching subsurface utilities as follows:
a. Quality Level D: Information derived from existing records or oral recollections.
b. Quality Level C: Information obtained by surveying and plotting visible above-
ground utility features and by using professional judgment in correlating this information
to Quality Level D information.
c. Quality Level B: Information obtained through the application of appropriate
surface geophysical methods to determine the existence and approximate position of
subsurface utilities. Quality Level B data shall be reproducible by surface geophysics,
such as ground penetrating radar, at any point of their depiction. This information is
surveyed to applicable tolerances and reduced onto plan documents.
d. Quality Level A: Precise horizontal and vertical location of utilities obtained by the
actual exposure (or verification of previously exposed subsurface and surveyed utilities)
and subsequent measurement of subsurface utilities, usually at a specific point.
Minimally intrusive excavation equipment is typically used to minimize the potential for
utility damage. A precise horizontal and vertical location, as well as other utility
attributes, is shown on the plan documents. Accuracy is typically set to 15-mm vertical
and to applicable horizontal survey and mapping accuracy.
2. Refer to CI/ASCE 38-02, Standard Guidelines for Collection and Depiction of Existing
Subsurface Utility Data for details.
3. CONSULTANT shall determine all utilities impacted by the work for all applicable Project
Elements of this Scope of Work. Utilities include all in-plant utilities. All utilities encountered
during the preliminary design shall be shown on the plans.
4. Subsurface investigation for all utilities in and around the work area shall be performed
to Quality Level D and Quality Level C. All utilities shall be plotted both in plan and profile on
a scaled drawing that can later be incorporated into scaled (1” = 40’) plan drawings.
5. CONSULTANT shall submit, for acceptance by OC San, recommendations on which
utilities should be investigated to Quality Level A and where Quality Level B investigations
should be performed. As part of the submittal, a Potholing Plan and Geophysical
Investigation Plan shall be developed including proposed pothole locations and type of
geophysical investigation.
6. Prior to OC San’s acceptance of the Potholing Plan/Geophysical Investigation Plan, a
project field walk by the CONSULTANT Project Manager, OC San Project Engineer,
Supervising Inspector, and other designated OC San personnel shall be performed.
E. Potholes and Geophysical Investigation
1. CONSULTANT shall secure the services of a subcontractor to perform the pothole work
and geophysical investigation (including ground-penetrating radar).
04-02-2020 P1-126 – Design SOW
Page 28 of 61
2. CONSULTANT shall “pothole” and perform geophysical investigation on all utilities
described and shown in the accepted Potholing Plan/Geophysical Investigation Plan.
CONSULTANT’s staff shall be on-site during potholing to provide direction to potholing crew.
OC San staff shall also be present during potholing. Field investigations include visiting the
project work site and each utility to verify the location of all interferences.
3. CONSULTANT shall provide all the related work necessary, including, but not limited to:
a. Documentation of information
b. Notification of USA’s “Dig Alert”
c. Providing field survey
d. Obtaining required permits
e. Submission of traffic control plans
f. Setting up traffic control
g. Soft dig potholing
h. Ground-penetrating radar
i. Excavating
j. Backfilling
k. Repairing pavement to local jurisdiction requirements
4. “Soft” excavation potholing methods such as vacuum extraction is preferred; however,
excavation methods shall be chosen to adequately define the utility. Crosscut trenches may
be preferred for defining some utility locations. Hydro-jetting soft dig should be avoided in
sandy, wet and contaminated soil conditions.
5. Potholing subcontractor shall measure and document the depth of pavement and of
base material at each pothole, and every five feet along crosscut trenches.
6. Work conducted within OC San’s treatment plants shall comply with the requirements of
the OC San Stormwater Management Plan. Work conducted outside OC San’s treatment
plant shall comply with the requirements of the local jurisdiction.
7. CONSULTANT shall provide a licensed land surveyor or hire a licensed survey
subcontractor(s) to field-locate the actual horizontal and vertical location of the constructed
potholes. Survey controls shall be set and coordinated with the survey controls used on
previous construction drawings. OC San control points shall be checked; northing, easting
and elevation data for each pothole shall be shown on the Contract Drawings; and physical
tie-ins provided in order to easily re-establish pothole locations after construction.
CONSULTANT shall supply and supervise survey work and subcontractors needed to
perform the pothole work. Survey datum differences shall also be reconciled.
8. The results of potholing and geophysical efforts shall be summarized in a field findings
report.
9. CONSULTANT shall backfill and repair potholes consistent with the requirements of the
local jurisdiction. If CONSULTANT is unable to determine local jurisdiction requirements
prior to the proposal, CONSULTANT shall assume the following requirements:
a. The materials removed from the excavation may not be used for backfill, unless
approved by the local jurisdiction. If approved, excavated material used to fill potholes
shall be placed with a maximum lift thickness of four inches and mechanically
compacted.
b. If not approved, the CONSULTANT shall be responsible for hauling off and
disposing of excavated pothole material. In this case, excavation holes shall be filled
04-02-2020 P1-126 – Design SOW
Page 29 of 61
with a cement slurry mix from the bottom up. The excavated materials shall be tested
for hazardous materials and disposed of offsite accordingly. Testing shall be the
minimum required for classifying the materials. The potholing samples shall be tested
by a California Environmental Laboratory Accreditation Program (ELAP) certified
laboratory to identify characteristics of hazardous waste. A substance shall be
considered hazardous if it possesses properties of toxicity, ignitability, corrosivity and/or
reactivity per California Code of Regulations Title 22, Section 66261. In addition,
Minimum the laboratory testing shall include an on-site Organic Vapor Analyzer (OVA)
test for potential hydrocarbon contaminants. Should the OVA reading be equal to or
greater than 45 ppm, further laboratory Minimum testing shall be performed to include
Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) test per EPA guideline 8020 and
Total Hydrocarbons (TPH) tests per EPA guideline. should the OVA reading be equal to
or greater than 45 ppm.
c. AC pavement shall be replaced to full depth or the structural section (AC & Base)
plus two inches with hot mix asphalt unless otherwise required by OC San. Cold mix
shall only be allowed when the patch will be replaced by the project and where approved
by OC San.
d. Concrete pavement shall be replaced to full depth plus two inches with Portland
cement unless otherwise required by OC San.
F. Quantitative Assumptions
1. 100 potholes will be needed during preliminary design and 100 potholes will be needed
during final design.
2. 75,000 square feet of geophysical investigation will be needed during preliminary
design.]
G. Depiction of Utilities and Potholes on Plans
1. All utilities encountered during the preliminary design shall be shown on the Plans.
Project work that requires other agencies to relocate existing utilities shall be coordinated
during the design by CONSULTANT. Each subsurface utility shown on the drawings shall
include the Quality Level to which it was investigated as required by CI/ASCE 38-02.
Pothole locations shall be shown on drawings with survey information.
H. Relocation of Existing Utilities
1. Project work that requires other agencies to relocate existing utilities shall be
coordinated during design by CONSULTANT.
2.2.11 FIRE PROTECTION SERVICES
A. CONSULTANT shall secure the services of a Subconsultant to determine the fire protection
requirements and prepare preliminary design and final plans and specifications for the selected
plan and assist OC San in obtaining approval from the fire authority.
B. Fire Flow Analysis:
☒Evaluation of existing potable water system is not required. Assume that the existing
potable water system has adequate pressure and volume to supply the required sprinkler
systems and hydrants.
☐Evaluate existing potable water system for adequate pressure and volume to supply the
required sprinkler systems and hydrants.
2.2.12 ELECTRICAL LOAD MEASUREMENTS
A. CONSULTANT shall perform preliminary calculations of existing equipment (i.e. panelboards
and motor control centers) early in PDR, prior to taking any load measurements to determine if
there is adequate spare capacity for the new loads on the existing normal and standby power
sources.
04-02-2020 P1-126 – Design SOW
Page 30 of 61
B. OC San will provide the following power monitoring data:
1. Power flow through each Cen-Gen 12kV feeder.
2. Power flow at the 480V mains of PB-4, PB-7, and PB-8 switchgears (power monitors do
not exist for the individual MCC feeders).
C. CONSULTANT shall develop a list of load measurements that need to be taken to perform
load calculation. OC San will perform the load measurements.
D. CONSULTANT shall take electrical measurements per Engineering Design Guidelines,
Chapter 10, Section 10.2.1.4 “Report- Load Measurement and Recording”.
E. The load measurements data shall be compiled in a Load Measurement and Recording
Report included as an attachment to the Electrical Design Memo.
F. CONSULTANT shall confirm and recommend whether the new odor control complex loads
can be moved to PB-7.
2.2.13 VALUE ENGINEERING ASSISTANCE
A. CONSULTANT shall participate in a Value Engineering (VE) program as described in the
EPA publication entitled “Value Engineering for Wastewater Treatment Works”, dated
September 1984. The workshop will be managed primarily by an independent VE consultant
hired by OC San.
B. Examples of topics that may be covered in the Value Engineering Study include: Project
concepts, operations requirements, maintenance requirements, user friendliness and safety,
possible project improvements, cost saving measures, public nuisance issues, site access,
safety, and constructability.
C. The VE workshop will be held by the VE Consultant at an off-site location in or around the
City of Fountain Valley, California, over a period of three days as follows:
1. CONSULTANT shall prepare all documentation to be reviewed at the workshop and mail
the materials to all VE workshop participants at least one week prior to the workshop.
2. The morning of Day One shall involve a detailed presentation by CONSULTANT to the
VE Consultant and OC San staff regarding the design and construction project to cover the
design concepts for each project element. The presentation shall be followed by a site walk.
A question and answer session shall follow and continue through lunch which will be
arranged for and provided by the VE Consultant. OC San stakeholders may also be
available to answer questions.
3. During the afternoon of Day One, CONSULTANT shall give a detailed presentation to
the VE Consultant and OC San staff regarding the design and construction project schedule
and a history of the decisions which limit the project and its sequencing. A question and
answer session for this presentation shall follow. OC San stakeholders may also be
available to answer questions.
4. Day Two will be a workday for the VE Consultant. At least one designated individual
from the CONSULTANT shall remain to answer questions and gather additional information
that the VE Consultant might need. OC San stakeholders may also be available to answer
questions.
5. The morning of Day Three will be reserved for the VE Consultant to formulate their
recommendations in preparation of their presentation that afternoon to CONSULTANT and
OC San staff. At least one designated individual from CONSULTANT shall be available
again to help the VE Consultant in their efforts. OC San stakeholders may also be available
for a discussion. The afternoon presentation by the VE Consultant will outline their
recommendations that are anticipated to be the body of the VE report. A designated
individual from VE Consultant will record the comments and take notes from the workshop to
document the process.
04-02-2020 P1-126 – Design SOW
Page 31 of 61
6. CONSULTANT shall participate in the workshop as described herein, evaluate the VE
Report recommendations, conduct additional engineering analyses as determined by OC
San, and meet with OC San to discuss the results of the engineering analyses and
incorporation of all additional recommendations into a Final VE Report. CONSULTANT shall
budget for 240 hours of staff time to evaluate VE recommendations and conduct additional
engineering analysis.
2.2.14 ENVIRONMENTAL DOCUMENTATION
A. CONSULTANT services related to Environmental Documentation may span across Phase 2
– Preliminary Design and Phase 3 - Design. When such services are required, they shall be
based on the requirements of Section III – Project Schedule and based on the following
requirements. The CONSULTANT shall allocate the budgeted hours between the
Environmental Documentation services in Phase 2 and Phase 3 based on when these services
will be required.
B. CEQA Documentation Support
OC San expects that a Notice of Exemption (NOE) will be required for this project. OC San
will separately arrange for preparation of required (NOE). The CONSULTANT shall produce
and assemble project information required for preparation of the NOE. Assume 80 hours for
level of effort.
2.2.15 PERMITTING ASSISTANCE
A. CONSULTANT services related to Permitting Assistance may span across Phase 2 –
Preliminary Design and Phase 3 - Design. When such services are required, they will be based
on the requirements of Section III – Project Schedule and the schedule constraints associated
with each particular permit. The CONSULTANT shall allocate the budgeted hours between the
Environmental Documentation services in Phase 2 and Phase 3 based on when these services
will be required.
B. For all applicable Project Elements of this Scope of Work, CONSULTANT shall provide Bid
Documents that ensure that the facility features and the facility performance, and construction
procedures comply with all conditions of existing permits and permits required to construct this
project. Construction drawings, specifications and supplemental drawings shall be prepared, as
necessary, in the format required to obtain all permits.
C. CONSULTANT shall assist OC San in obtaining permits. This assistance shall include
completing application forms provided by OC San, preparing supporting documentation for the
permit applications as required by the issuing agency, furnishing the required number of copies
of all construction drawings and exhibits, and attending meetings with permitting agencies at the
request of OC San.
D. With the exception of construction contractor-furnished permits, OC San staff will execute all
applications. All permit fees will be paid directly by the OC San and will not be part of
CONSULTANT’s fee.
E. CONSULTANT shall submit all supporting documentation in a timely fashion for all permits
required for this project as described below.
F. SCAQMD Permitting
1. CONSULTANT shall provide assistance to OC San in obtaining the South Coast Air
Quality Management District (SCAQMD) permits for the project by performing following
tasks:
2. Demonstration of Compliance with New Source Review for Criteria Pollutants (SCAQMD
Reg. XIII)
a. Emissions Estimation: CONSULTANT shall estimate emissions of criteria pollutants
in terms of both concentrations and mass rates to determine if there is an increase in
04-02-2020 P1-126 – Design SOW
Page 32 of 61
“uncontrolled” emissions (mass rates) from the project. CONSULTANT may utilize air
sampling data previously collected by OC San. If OC San’s data is not adequate,
CONSULTANT shall perform source tests and/or conduct fate-transport modeling.
CONSULTANT shall submit the emission estimates to OC San for approval prior to
proceeding with the subsequent work.
b. Best Available Control Technology (BACT): If there is an increase in “uncontrolled”
emissions (any amount for NOx and CO and greater than 1 lb/day each for VOC, NH3,
and PM10), CONSULTANT shall evaluate and determine BACT for the affected
pollutant(s).
3. Demonstration of Compliance with New Source Review for Air Toxics (SCAQMD Rule
1401)
a. Emissions Estimation: CONSULTANT shall estimate emissions of Toxic Air
Contaminants (TACs) in terms of both concentrations and mass rates for each of the
TAC listed in SCAQMD Rules 1401 and 1402 – “Proposed List of Air Toxic Target
Compounds for POTW.” CONSULTANT may utilize air sampling data previously
collected by OC San. If OC San’s data is not adequate, CONSULTANT shall perform
source tests and/or conduct fate-transport modeling. CONSULTANT may also obtain
supporting data from literature searches or from similar processes at other wastewater
treatment facilities. CONSULTANT shall submit the emission estimates to OC San for
acceptance prior to proceeding with the subsequent work.
b. Screening Risk Assessments: If there are any TAC emissions, CONSULTANT shall
conduct a Tier 1 screening risk assessment using the latest version of Risk Assessment
Procedures for Rules 1401, 1401.1 and 212 from the SCAQMD Risk Tool spreadsheet.
c. Air Dispersion Modeling and Health Risk Assessment: If the project does not pass
the Screening Risk Assessments as outlined in 3.b. above, CONSULTANT shall
conduct air dispersion modeling and either a Tier 3 or 4 health risk assessment(s) to
demonstrate that the project will not result in an increased Maximum Individual Cancer
Risk (MICR) greater than one-in-one million (1.0 x 10-6), nor an increased Chronic
Hazard Index exceeding 1.0 at any off-site residential, sensitive or workplace recptor.
Additionally, CONSULTANT shall demonstrate that the project will not exceed an Acute
Hazard Index of 1.0 at any off-site receptor location. Prior to conducting this task,
CONSULTANT shall submit the proposed modeling methodology for OC San’s review
and acceptance prior to conducting the work.
d. Best Available Control Technology for Toxics (T-BACT): If the MICR from the
project is greater than one-in-one million (1.0 x 10-6), CONSULTANT shall evaluate and
determine the T-BACT.
e. The air dispersion modeling shall be conducted using the EPA’s AERMOD
dispersion software. OC San has an existing AERMOD model built for a previous odor
modeling project which may require substantial revisions to correct deficiencies and to
update structures built since the model was last updated. CONSULTANT may use the
data in the existing model, provided CONSULTANT verifies the accuracy of the data
with OC San. The health risk assessment shall be conducted per SCAQMD’s latest
“Risk Assessment Procedures for Rule 1401 and 1402.
4. Demonstration of Compliance with Odor Nuisance (SCAQMD Rule 402)
a. The results of the foul air characterization and odor dispersion modeling conducted
under this task may be used to demonstrate that the project complies with SCAQMD
Rule 402.
5. Planning and Design Strategies for Air Pollution Control System
a. If an air pollution control system is required for BACT, T-BACT, and/or Odor,
CONSULTANT shall be responsible for planning and design strategies to meet
04-02-2020 P1-126 – Design SOW
Page 33 of 61
regulatory and OC San standards and perform any additional air dispersion modeling to
determine the efficacy of the proposed air pollution system. All exhaust stacks, vents,
and sample ports required shall meet SCAQMD’s Guidelines for Construction of
Sampling and Testing Facilities.
6. Demonstration of Compliance with SCAQMD Rule 212
a. If there is a K-12 school within 1,000 feet of the project, CONSULTANT shall notify
OC San for further instruction.
7. Preparation of the Draft Application Package
a. CONSULTANT shall provide the draft application package for OC San’s review and
comments. The package shall include all applicable permit application forms available
on SCAQMD’s website and supplemental information including, but not limited to, the
following:
(1) General Project Description and Location
(2) Process/Equipment Description
(3) Design Criteria for Process/Equipment and Air Pollution Control System
(4) Process/Equipment Drawings
(5) Summary of Work Performed under Items 1 thru 5 above
(6) Demonstration of Compliance with Other Applicable SCAQMD, State, and
Federal Air Quality Regulatory Requirements
8. SCAQMD Permitting Meetings
a. CONSULTANT shall assume meetings for the following subjects related to
SCAQMD permitting:
(1) SCAQMD Permitting Kickoff Meeting
(2) Air Emissions Estimates
(3) Air Dispersion and Health Risk Assessment
(4) Compliance Demonstration Review
(5) Permit Application Material (2 meetings)
(6) Review of draft SCAQMD permits.
b. The CONSULTANT shall assume 4 meetings at 1 hours each.
G. Building Permits
1. City of Fountain Valley Fire Department Permit (for chemical areas)
2. The CONSULTANT shall assume 3 meetings at 1 hours each.
H. Stormwater Permitting
1. Stormwater permitting is not required for this project.
2.2.16 PROJECT MANAGEMENT
A. CONSULTANT shall be responsible for managing CONSULTANT’s project execution,
schedule, budget, subconsultants, and coordination with other projects. The CONSULTANT
shall perform the project management requirements in accordance with Exhibit 2 - Project
Management Requirements with the project specific options identified below.
B. Project Management Plan (PMP):
04-02-2020 P1-126 – Design SOW
Page 34 of 61
☐Not required
☒Required
PMP approval prior to beginning technical work on the project.
C. Project Logs
☒Major Decision Log
☒Project Decision Log
☒Action Item Log
☒Decision Issues Log
☒Meeting Log
☒Risk Management Log
D. Progress Report, Status of Cost Model
☐Not required
☒Required
E. Project Invoices
1. Estimating earned value, tasks shall be further broken down to subtasks of no more than
$100,000.
2. Costs for invoicing shall be grouped into the following work packages:
Work Package Description Tasks
3146 Preliminary Design All Phase 2 tasks, except those listed
above.
3251 Design Submittal 1 Tasks 3.0 through 3.3, divided into
effort by design submittal. FDS is
charged against DS3.
3252 Design Submittal 2
3253 Design Submittal 3
3254 Bid Support Services Task 3.4
2.2.17 RISK MANAGEMENT
A. When required below, CONSULTANT shall provide risk management in accordance with
Exhibit 3 - Risk Management Requirements with the project specific options identified below.
B. Risk Management:
☐Not required
☒Required
Initial Risk Workshop
PDR Risk Management Workshop: 4 hours. (held 4 weeks prior to draft PDR at OC San)
C. Moderator
1. CONSULTANT shall provide a suitably qualified moderator to conduct the Workshops
defined in Exhibit 3 - Risk Management Requirements. The moderator shall have the
following attributes:
a. Sufficiently technically knowledgeable to understand the nature of the risks involved,
but the moderator need not be a subject matter expert.
04-02-2020 P1-126 – Design SOW
Page 35 of 61
b. Not extensively involved in the project to date, so that the moderator has no
personal stake in the issues. CONSULTANT’s Project Manager and Project Engineers
for this project are not considered suitable.
(1) Employed by CONSULTANT or a Subconsultant.
2. The Preliminary Design Risk Management Workshop shall be planned and scheduled
for a duration of 4 hours and will be held at OC San offices.
2.2.18 QUALITY CONTROL
A. The CONSULTANT shall provide quality control requirements in accordance with Exhibit 5 -
Quality Control Requirements.
PDR WORKSHOPS AND MEETINGS
2.3.1 GENERAL
A. Workshop and meeting planning, requirements, agendas, and meeting minutes shall be in
accordance with Exhibit 4 - Workshop and Meeting Requirements.
2.3.2 PDR PRODUCTION WORKSHOPS
A. Predesign Kickoff Workshop
1. A four-hour project kick-off meeting shall be held with OC San staff to introduce principal
members of OC San and CONSULTANT’s teams. The discussion topics shall include: OC
San responsibilities, CONSULTANT’s responsibilities, invoice procedures, personnel
badges, parking, site access, CONSULTANT’s Scope of Work, detailed project schedule
with milestones, Work Breakdown Structure requirements, and OC San confined space and
other safety policy training.
B. PDR Production Workshops shall be held during Preliminary Design to discuss the topics
listed below. PDR Production Workshops shall be held to discuss topics to facilitate preparation
of design memos and are separate from PDR Design Memo Workshops and PDR Review
Workshops which are described further in the following sections. The list below indicates the
number of PDR Production Workshop topics anticipated to be held to cover the specific topic.
Unless otherwise noted, each workshop shall be 2 to 4 hours in length. Workshops may be
combined as needed and additional workshops may be held as needed to facilitate PDR
production. Some workshops may be held as technical progress meetings.
PDR PRODUCTION WORKSHOPS
TOPIC NUMBER OF
WORKSHOPS
PDR Production Kickoff 1
PDR Production Workshops -
Design Parameters 1
Facility Operation and Maintenance (Project-wide issues) 1
Geotechnical 1
Permitting and Compliance 2
Electrical 3
Instrumentation and Control 3
Utility Investigations 1
2.3
04-02-2020 P1-126 – Design SOW
Page 36 of 61
PDR PRODUCTION WORKSHOPS
TOPIC NUMBER OF
WORKSHOPS
Hazardous Materials 1
Implementation Plan and Sequencing Constraints 3
Equipment and Process Redundancy Workshop (described below) 1
Maintainability Workshop (described below) 1
PDR Constructability Workshop (described below) 1
2.3.3 DESIGN MEMO WORKSHOPS
A. CONSULTANT shall hold workshops to present and review the Design Memos as required
in Exhibit 4 - Workshop and Meeting Requirements.
2.3.4 PROJECT SPECIFIC DESIGN MEMO WORKSHOPS
A. CONSULTANT shall hold the following workshops at a minimum for the project specific
design memos.
Task No. Topic Description
2.1.3. Hydraulic Analysis
(3 workshops)
Kickoff. Meeting to provide overview of the model,
approach for incorporating updates and conducting
analysis. Review parameters to be updated.
Model Update. Meeting to present the updates to
the hydraulic model and review model results.
System Improvements. Meeting to present and
review recommended system improvements.
2.1.3
Condition Assessment
(3 workshops)
Site Visit Planning. Meeting will be used to confirm
what facilities and equipment will be inspected and
that each site visit is warranted, and a discussion of
what observations should be made.
Site Visit Debrief. The site visitors will debrief the
rest of the project team on the findings of the site
visits, and what conclusions can be drawn.
Condition Assessment. CONSULTANT shall
present the findings of the condition assessments
for the piping and summarize the recommendations
for addressing deficiencies. The workshop shall
occur prior to submitting the related evaluation
memo.
04-02-2020 P1-126 – Design SOW
Page 37 of 61
Task No. Topic Description
2.1.3 Primary Odor Scrubber
Complex Condition
Assessment
(3 workshops)
Site Visit Planning. Meeting will be used to
confirm what facilities and equipment will be
inspected and that each site visit is warranted, and
a discussion of what observations should be made.
Review of Findings. CONSULTANT shall discuss
individual components of the facilities, rehabilitation
options, and how the components may be replaced
while maintaining system operation.
Review of Technologies. CONSULTANT shall
present the options for single stage scrubber and
dual stage scrubber technologies relative to the
findings of the condition assessment.
2.1.3 Primary Odor Scrubber
Complex Rehabilitation and
Replacement
(1 workshops)
Design Criteria. CONSULTANT shall present draft
design criteria based on decisions made in 2.2.3. If
applicable, the results of odor sampling may be
presented. Preliminary layout and configuration of
the scrubber system shall be presented.
2.3.5 PDR REVIEW WORKSHOPS
A. CONSULTANT shall hold the following workshops to review the draft Preliminary Design
Report as required in Exhibit 4 - Workshop and Meeting Requirements:
1. Draft PDR Presentation Workshop
2. Draft PDR Review Workshop
3. PDR Validation Workshop
2.3.6 EQUIPMENT AND PROCESS REDUNDANCY WORKSHOP
A. An equipment and process redundancy workshop shall be held after the draft process flow
diagrams have been developed to review the proposed redundancy requirements and
equipment sizing versus equipment quantity for the systems provided by the project. The
equipment and processes shall be designed to include sufficient redundancy in process trains
and standby equipment to allow for serviceability without disruption in plant operations.
Philosophies to be discussed shall include the following:
1. Equipment which may be difficult, costly, or time consuming to maintain may require
additional redundancy to mitigate reliability issues.
2. In general, there is a trade off on the size of the selected equipment. Large equipment
reduces the total quantity of equipment to perform the function. This helps with reducing the
number of equipment pieces that must be maintained, but may result in burdensome and
lengthy downtime periods for repair. Small equipment provides the reverse. More
equipment is needed for the function creating more things to maintain. However, it provides
for more flexibility and typically has a shorter down time.
3. Considerations must be provided to avoid single points of failure. For example,
redundancy in mechanical equipment can be negated if all equipment is powered on a
single common MCC.
4. The Consultant shall develop and establish the reliability and redundancy criteria
through workshops and evaluation and design memoranda.
04-02-2020 P1-126 – Design SOW
Page 38 of 61
5. Operations and Maintenance (O&M) staff including staff from Maintenance Reliability
and Planning must be involved in the establishment of the maintainability design rules.
B. The equipment and process redundancy workshop shall be held at OC San’s facilities and
shall generally be 2 to 4 hours in length. The CONSULTANT shall facilitate this workshop and
OC San and CONSULTANT staff shall attend.
C. A follow up workshop shall be held at OC San’s facilities to review the final equipment and
process redundancy requirements.
D. CONSULTANT shall be responsible for completing the following tasks relative to the
workshop:
1. Prepare package for the equipment and process redundancy workshop participants. The
package shall consist of process flow diagrams and other information selected by
CONSULTANT.
2. Prepare presentation on the project.
3. Summarize the equipment and process redundancy workshop comments and action
taken on each comment in a memorandum.
4. All comments and recommendations of the workshop shall be incorporated into the
Process Design Configuration Design Memo and the bid documents.
2.3.7 MAINTAINABILITY WORKSHOPS
A. A maintainability workshop shall be held after draft floor plans have been developed to:
1. Review the working space around equipment, accessibility requirements, specific
activities required to be performed by maintenance staff, ease of servicing for equipment
and devices, means to removing equipment from the point of installation to a location
outside the facility.
2. The workshop shall be used to develop a set of project maintainability design rules
based on the requirements in Chapter 7 of the Engineering Design Guidelines, coordination
with OC San staff, lessons learned from prior projects, CONSULTANT staff expertise, and
manufacturer data.
3. The CONSULTANT shall research and provide the following maintainability information
for the workshop:
a. Sludge pumps and grinders
b. Primary clarifier mechanical equipment
c. Primary clarifier covers
d. Odor control systems
e. Chemical containment area
4. Operations and Maintenance (O&M) staff including staff from Maintenance Reliability
and Planning must be involved in the establishment of the maintainability design rules.
B. The maintainability workshop shall be held at OC San’s facilities and shall generally be 2 to
4 hours in length. OC San and CONSULTANT staff shall attend this workshop.
C. A follow up maintainability workshop shall be held at OC San’s facilities to review the draft
project maintainability design rules.
D. The project maintainability design rules shall be followed during detailed design.
E. CONSULTANT shall be responsible for completing the following tasks relative to the
workshop:
04-02-2020 P1-126 – Design SOW
Page 39 of 61
1. Prepare package for the maintainability workshop participants. The package shall
consist of plans, process flow diagrams, P&IDs and other information selected by
CONSULTANT.
2. Prepare presentation on the project.
3. Review 3D model if applicable to the project.
4. Summarize the maintainability review workshop comments and action taken on each
comment in a memorandum.
5. All comments and recommendations of the workshop and the project maintainability
design rules shall be incorporated into the Maintainability Design Memo and the bid
documents.
2.3.8 PDR CONSTRUCTABILITY WORKSHOP
A. A constructability workshop shall be held after the draft PDR submittal review to identify any
fatal flaws in the design relative to constructability. Some of the subjects that shall be covered in
this workshop include the following: conflicts between design disciplines, geotechnical
considerations, construction sequencing, power outages, equipment shutdowns, viability of
equipment relocation, safety, operational requirements, access for maintenance, size-critical
equipment requirements and constraints, permitting, public nuisance issues, other local
conditions and constraints.
B. This workshop shall be held at OC San facilities and shall generally be 4 to 6 hours in
length. OC San and CONSULTANT staff shall attend this workshop.
C. CONSULTANT shall be responsible for completing the following tasks relative to the
workshop:
1. Prepare package for constructability review workshop participants. The package shall
consist of detailed plans and specifications and other information selected by
CONSULTANT.
2. Prepare presentation on the project.
3. Summarize the constructability review workshop comments and action taken on each
comment in a memorandum.
4. All comments and recommendations of the workshop shall be incorporated into
Implementation Plan Design Memo and the Bid Documents.
2.3.9 TECHNICAL PROGRESS MEETINGS
A. Technical Progress Meetings shall be monthly to review various issues with OC San’s
project team. A total of 16 meetings shall be held during Preliminary Design Phase. The
CONSULTANT shall coordinate with the OC San Project Manager to determine what topics will
be covered in what meetings, and what OC San and CONSULTANT team members are
required for each.
2.3.10 FOCUSED MEETINGS
A. Focused meetings shall be held throughout preliminary design to discuss specific issues in
detail and generate comments and direction from OC San staff. The following tentative list of
topics may be covered in these meetings:
1. Site survey
2. Site utility coordination
3. Geotechnical report
4. Quality control plan
5. Common names for facilities and equipment
04-02-2020 P1-126 – Design SOW
Page 40 of 61
6. Process Flow diagram/Operating Philosophy (several meetings as needed)
7. Permits
8. OC San Safety Standards, confined space and other safety requirements
9. Fire Department requirements
10. City requirements
11. Fire protection
12. Landscaping plan
13. Architectural concepts
14. Survey and geotechnical requirements
15. Potholing
16. Hazardous Area classification (with OC San Authority Having Jurisdiction representative
participating)
17. Utilities and utility tie-ins
18. Technical Definitions/equipment data sheets
19. Control concepts
20. Instrumentation and control upgrades
21. Sample P&ID; basis for equipment tag numbering
22. Sample control descriptions
23. Sample EID database
24. Sample SAT database
25. Data network block diagram/network connection diagram
26. I/O relocation plan
27. Electrical distribution system, system controls and the related upgrades
28. Single-line diagrams and electrical demolition
29. Modes and analyses cases for electrical studies
30. Criticality Table update
31. Standby power
32. Construction sequencing
33. Special studies
34. Coordination with other projects
35. Additional meetings as necessary
B. Meeting lengths shall be as required to cover the topic in question. Depending on subject
matter and attendees, one meeting may cover multiple subjects. CONSULTANT shall determine
how many meetings will be needed to cover these topics. CONSULTANT may suggest
additional topics as necessary. Supplementary meetings may be scheduled with OC San staff,
as necessary to allow coordination between CONSULTANT and OC San staff. In addition to the
above meetings, CONSULTANT shall anticipate bi-weekly coordination calls between OC San
and CONSULTANT technical design staff to coordinate open tasks.
2.3.11 COORDINATION WITH OTHER PROJECTS MEETINGS
04-02-2020 P1-126 – Design SOW
Page 41 of 61
A. The project shall be a complete and fully functional facility that is integrated with existing
facilities and coordinated with other construction projects. CONSULTANT shall coordinate
potential conflicts with the following adjacent projects and participate in the number of meetings
indicated in the following table:
PROJECT COORDINATION MEETINGS
PROJECT PROJECT DESCRIPTION COORDINATION MEETINGS
P1-140 Activated Sludge-1 and
Secondary Clarifier
Rehabilitation
2 meetings @ 1 hours
P1-105 Headworks Rehabilitation at
Plant 1
2 meetings @ 1 hours
Other projects coordination Other projects coordination 4 meetings @ 1 hour
2.3.12 STORMWATER COMPLIANCE MEETING
A. A formal meeting shall be held with OC San’s stormwater compliance staff to review the
project scope and identify all issues during and after construction affecting compliance with
stormwater regulatory requirements and OC San’s policies and practices.
3. PHASE 3 – DESIGN
BID DOCUMENTS
3.0.1 GENERAL
A. CONSULTANT shall provide engineering services to prepare biddable plans, technical
specifications, and other Bid Documents as required based on the design concepts and criteria
developed during Phase 2 - Preliminary Design. In this Scope of Work, construction documents
include specifications; drawings; cable, conduit and cable tray schedules; commissioning plan
materials; equipment and instrumentation database (EID); SCADA Administration Tool (SAT);
and bypassing plans.
3.0.2 ENGINEERING DESIGN GUIDELINE UPDATES
A. All changes in OC San’s Engineering Standards, OC San’s Design Guidelines, and/or
changes in design concepts and facility layouts as a result of OC San comments that may occur
up to transmittal of OC San comments on Design Submittal 2, shall be incorporated into the
Design by CONSULTANT with no increase in CONSULTANT’s Not-to-Exceed upper limit on
fees.
3.0.3 GENERAL REQUIREMENTS AND ADDITIONAL GENERAL REQUIREMENTS
A. The following are the minimum Additional GRs topics required for this project:
☒Summary of Work
☒Work Sequence
☒Work Restrictions
☒Permits
☒Measurement and Payment (includes Mobilization/Demobilization)
☒Contractors Construction Schedule and Reports
☒Seismic Design Criteria (for those restraints, supports, etc. to be design by the Contractor)
☒Quality Assurance-Quality Control Program
☒Vehicular Access, Staging and Security
☒Traffic Control
3.0
04-02-2020 P1-126 – Design SOW
Page 42 of 61
☒Contractor and Engineer’s Field Offices
☒Shipping, Storage and Handling
☒Project Control Management System (PMWeb construction management software)
☒Equipment Service Manuals
☒Equipment and Instrument Database (EID)
☒Commissioning
☒Training of OC San Personnel
☒Hazardous Materials Mitigation and Controls
☒Mold Remediation and Controls
3.0.4 DESIGN SUBMITTALS
A. The CONSULTANT shall produce the following design submittals as indicated below in
accordance with Exhibit 1 - Preliminary Design Report Requirements
B. Exhibit 1 - Design Requirements. If a design submittal is eliminated, then the design
submittal shall include the requirements associated with the required design submittal along with
the requirements associated with the previous unchecked design submittals.
☒Design Submittal 1
☒Design Submittal 2
☒Design Submittal 3
☒Final Design Submittal
C. Continuing Work After Design Submittal Submission
☒CONSULTANT is expected to continue design work on the project while OC San staff
reviews Design Submittal 1 and Design Submittal 2. For Design Submittal 3,
CONSULTANT shall stop all design work until receipt of OC San comments on that
submittal.
☐CONSULTANT is expected to stop design work on the project until OC San staff
completes the review of each Design Submittal.
3.0.5 CABLE AND CONDUIT SCHEDULE
☐CONSULTANT shall put the cable and raceway schedule on the drawings. CONSULTANT
may utilize an Excel spreadsheet and copy the spreadsheet onto the drawings.
☒ CONSULTANT shall utilize OC San’s Microsoft Access Cable and Raceway Schedule
database electronic format. See exhibit titled “Cable Conduit and Tray Schedule Database”.
3.0.6 COMMISSIONING PLAN MATERIALS
A. The CONSULTANT shall provide a commissioning plan materials in accordance Exhibit 1 -
Preliminary Design Report Requirements
B. Exhibit 1 - Design Requirements. It is intended that commissioning plan materials
developed for OC San Project No. P2-98 be used to the extent possible for this project.
CONSULTANT shall identify necessary tests. OC San will provide example test procedures for
standard equipment, for ORT and Pre-FAT testing, from OC San’s Procedure Generator
application.
C. Specification Section 01810, Commissioning
☐OC San will prepare Section 01810
☒CONSULTANT shall edit Section 01810
D. ORT Procedures
☐OC San will prepare ORT procedures
☒CONSULTANT shall prepare ORT procedures using OC San’s ORT procedure generator
04-02-2020 P1-126 – Design SOW
Page 43 of 61
☐CONSULTANT shall prepare new ORT procedures
E. Pre-FAT Procedures
☐Pre-FAT procedures not required
☐OC San will prepare Pre-FAT procedures
☒CONSULTANT shall prepare Pre-FAT procedures
F. FAT Procedures
☐OC San will prepare FAT procedures
☒CONSULTANT shall prepare FAT procedures
G. RAT Procedures
☐RAT procedures not required
☐OC San will prepare RAT procedures
☒CONSULTANT shall prepare RAT procedures
Development of RAT procedures in this task does not require detailed narratives as shown
in Exhibit 25 and shall be limited to the following approach developed for OC San Project
No. P2-98:
· Define the processes that will be tested during RAT
· Define pre-requisites to RAT
· Define Length of RAT while running under normal operation.
· Develop a schedule of operations to test each operating mode.
· Develop forms to be completed by the inspection team (OC San, Contractor and
Design Engineer) that document baseline operation.
H. PAT Procedures
☐PAT procedures not required
☐OC San will prepare PAT procedures
☒CONSULTANT shall prepare PAT procedures
3.0.7 EQUIPMENT AND INSTRUMENTATION DATABASE (EID)
☐EID is not required.
☐OC San will develop the EID in accordance Exhibit 1 - Preliminary Design Report
Requirements
Exhibit 1 - Design Requirements.
☒CONSULTANT shall develop EID in accordance Exhibit 1 - Preliminary Design Report
Requirements
Exhibit 1 - Design Requirements.
3.0.8 SCADA ADMINISTRATION TOOL (SAT)
☐SAT is not required.
☐OC San will develop the SAT in accordance Exhibit 1 - Preliminary Design Report
Requirements
Exhibit 1 - Design Requirements.
☒CONSULTANT shall develop the SAT in accordance Exhibit 1 - Preliminary Design Report
Requirements
Exhibit 1 - Design Requirements.
3.0.9 CONSTRUCTION SUBMITTAL ITEMS LIST
☐OC San will develop the Construction Submittal Items List in accordance with Exhibit 1 -
Preliminary Design Report Requirements
Exhibit 1 - Design Requirements.
04-02-2020 P1-126 – Design SOW
Page 44 of 61
☒CONSULTANT shall develop the Construction Submittal Items List in accordance with
Exhibit 1 - Preliminary Design Report Requirements
Exhibit 1 - Design Requirements.
3.0.10 TEMPORARY FACILITIES DURING CONTRUCTION
☐Temporary facilities and bypass pumping are not required.
☐Temporary facilities and bypassing during construction are required, as described under the
“Temporary Facilities During Construction” paragraph under the Project Elements, and shall be
described in words on the drawings and technical specifications.
☒Detailed plans and work sequence for temporary facilities and bypassing during construction,
as described under the “Temporary Facilities During Construction” paragraph under the Project
Elements.
A. CONSULTANT shall design measures for the temporary handling of flows to be
implemented by the Contractor during construction considering OC San’s goal of zero sewage
spills.
B. If existing facilities such as valves, gates, stop logs, etc. are being used for shutdowns or
diversions, include a plan for testing those facilities during Phase 3 - Design to verify that they
will function adequately for the purpose. If testing cannot be performed, CONSULTANT shall
identify the risks associated with using the facility for bypassing, along with contingency plans
and mitigation measures to be implemented if they are found not function adequately during
construction.
DESIGN SUPPORT DOCUMENTATION
3.1.1 DESIGN SUBMITTAL SUPPORT DOCUMENTATION
A. The CONSULTANT shall provide a Design Submittal Support Documentation in accordance
Exhibit 1 - Preliminary Design Report Requirements
B. Exhibit 1 - Design Requirements.
C. Design Information
1. CONSULTANT shall include the following material with each Design Submittal:
a. CONSULTANT shall maintain the Project Logs specified under Phase 2 Project
Management through Phase 3. Current copies of all logs shall be included with each
Design Submittal.
b. Written response log to OC San comments on the previous submittal.
c. CEQA and Regulatory Compliance Matrix. This matrix shall list each applicable
CEQA mitigation requirement and all known permit requirements with the corresponding
description of how each requirement is to be satisfied. Measures to satisfy requirements
might be in the GRs, Additional GRs, particular specification requirements, or actions
taken separately from the construction contract.
d. Calculations
e. Draft or final Geotechnical Reports not submitted in the previous submittal and those
revised since the previous submittal.
f. Proposed list of suppliers to be named in the specifications for major equipment
g. Draft or final Fire Protection Reports not submitted in the previous submittal and
those revised since the previous submittal.
3.1
04-02-2020 P1-126 – Design SOW
Page 45 of 61
h. Draft or final Field Findings Reports not submitted in the previous submittal and
those revised since the previous submittal.
i. Equipment data sheets
j. Equipment catalog cuts and vendor quotations.
k. Commissioning Package List: The Preliminary Commissioning Package List first
developed in the PDR Production Phase shall be updated in each Design Submittal and
used as a starting point to develop the list of commissioning procedures.
l. All memos that are prepared since the previous submittal was delivered.
D. Facility Operation and Maintenance
☐Not required.
☒Update operating philosophies
☐Update estimates of Operation and Maintenance staffing requirements
E. Electrical Deign Documentation
☐Electrical design documentation not required.
☒ Updated Electrical Load Criticality Table
☒ Electrical Analysis Report
☒ Load list for all equipment
☒ Equipment sizing from three manufacturers for motor control centers, switchgear, and power
panels
☒ Lighting calculations
☒ Standby generator loading calculations
☒ Ductbank cable pulling tension, derating and cable tray fill calculations
F. Power System Studies
☐ETAP not required.
☒Plant ETAP model for the project performed by OC San.
☐Plant ETAP model for the project performed by CONSULTANT.
☐Electrical Systems Analysis Report performed by CONSULTANT.
3.1.2 CONSTRUCTION COST ESTIMATE
A. The CONSULTANT shall provide a cost estimates for the associated design submittal
indicated below in accordance with Exhibit 1 - Preliminary Design Report Requirements
B. Exhibit 1 - Design Requirements.
☒Design Submittal 1 (Required in addition to Exhibit 2 and Engineering Design Guidelines
requirements)
☒Design Submittal 2
☒Design Submittal 3
☒Final Design Submittal
3.1.3 CONSTRUCTION SCHEDULE
A. The CONSULTANT shall provide a Preliminary Construction Schedule for the associated
design submittal indicated below in accordance with Exhibit 1 - Preliminary Design Report
Requirements
B. Exhibit 1 - Design Requirements.
☐Construction Schedule is not Required
04-02-2020 P1-126 – Design SOW
Page 46 of 61
☒Design Submittal 1
☒Design Submittal 2
☒Design Submittal 3
☒Final Design Submittal
3.1.4 PROCUREMENT ALTERNATIVES
A. The CONSULTANT shall recommend the appropriate procurement alternatives as described
in Exhibit 1 - Preliminary Design Report Requirements
B. Exhibit 1 - Design Requirements.
☐Procurement alternatives not required
☒Procurement alternatives required
C. Equipment that may be needed to be obtained from a sole source supplier for this project
includes:
1. Primary clarifier aluminum covers from Halsten Corporation
DESIGN ACTIVITIES
The following services shall be provided by the CONSULTANT or an appropriately qualified
subconsultant. In any case, the CONSULTANT shall be responsible for managing all subconsultants,
including reviewing their work products prior to submission to OC San.
3.2.1 EASEMENTS, PROPERTY BOUNDARIES AND WORK AREA LIMITS
A. CONSULTANT services related to Easements, Property Boundaries and Work Area Limits
on the project are specified in Phase 2 – Preliminary Design and those services shall continue
during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours
between Phase 2 and Phase 3 based on when these services will be required.
3.2.2 TOPOGRAPHIC SURVEY
A. CONSULTANT services related to Topographic Survey on the project are specified in Phase
2 – Preliminary Design and those services shall continue during Phase 3 – Design as required.
CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when
these services will be required.
3.2.3 GEOTECHNICAL BASELINE REPORT
1. CONSULTANT shall prepare a Geotechnical Baseline Report (GBR). The GBR shall be
prepared by the prime CONSULTANT, rather than by the Geotechnical Subconsultant that
prepared the Geotechnical Data Report.
2. The Geotechnical Baseline Report (GBR) shall conform to the most recent issue of the
American Society of Civil Engineers (ASCE) “Geotechnical Baseline Reports of
Underground Construction: Guidelines and Practices”.
3. The GBR shall be site specific and shall include a narrative of all known soil conditions
and subsurface expected constraints. The GBR shall establish quantitative thresholds and
shall make specific recommendations to the Contractor regarding actions to be taken by the
Contractor during construction, such as dewatering, removal of boulders by size, all other
excavation and backfill stages, etc. Thresholds expressed as ranges of values will not be
acceptable to OC San (i.e. 100-200 gpm, or 5-10 CY). All thresholds shall be expressed in
the form of one number (i.e. 150 gpm, or 7 CY).
4. The GBR will be used during construction to enforce the Differing Site Condition clause
included in the construction Contract Agreement.
3.2
04-02-2020 P1-126 – Design SOW
Page 47 of 61
5. The draft GBR shall be submitted to OC San staff for review and comments along with
the DS2 submittal package. The final GBR incorporating OC San comments shall be
submitted with the DS3 submittal package.
3.2.4 UTILITY INVESTIGATION
A. CONSULTANT services related to Utility Investigation on the project are specified in Phase
2 – Preliminary Design and those services shall continue during Phase 3 – Design as required.
CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when
these services will be required.
B. Final Design Submittal Utility Coordination Reviews
1. During DS3 submittal review, the CONSULTANT shall meet with outside agencies to
verify any changes made by agency during final design period and compare them with the
Contract Drawings. CONSULTANT shall follow through with due diligence on utilities that do
not participate in the USA program, unknown owner of a facility and/or abandoned utilities.
2. During DS3 submittal review, an on-site inspection shall be made in the project area.
During the on-site inspection, a senior-level CONSULTANT representative shall walk the site
accompanied by OC San’s Project Engineer and Supervising Inspector. The
CONSULTANT’s representative shall be experienced in the location and identification of
utilities in the field. During the on-site inspection the CONSULTANT shall document all
visible features that indicate utilities within the project area and compare them with the
Contract Drawings.
3.2.5 FIRE PROTECTION SERVICES
A. CONSULTANT shall secure the services of a Subconsultant to determine the fire protection
requirements, prepare final plans and specifications for the selected plan and assist OC San in
obtaining approval from the fire authority.
3.2.6 NOISE EVALUATION SERVICES
A. CONSULTANT shall secure the services of a Subconsultant to prepare a field finding Noise
Report. This report shall include the following:
1. Visit site and conduct ambient noise measurements to establish baseline.
2. Identify external sources of noise.
3. Identify potential methods for defining noise impacts.
4. Develop noise model consistent with noise impact assessment methods.
5. Determine exterior noise levels and compliance with assessment standards.
6. If required, develop mitigation measures to meet design standards.
7. Determine compliance with OSHA’s regulations.
8. If needed, determine mitigation measures to meet OSHA’s requirements.
9. Prepare written report on findings and recommendations.
3.2.7 ENVIRONMENTAL DOCUMENTATION
A. CONSULTANT services related to Environmental Documentation on the project are
specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 -
Design. The CONSULTANT shall allocate the budgeted hours between the Environmental
Documentation services in Phase 2 and Phase 3 based on when these services will be required.
3.2.8 PERMITTING ASSISTANCE
A. CONSULTANT services related to Permitting Assistance on the project are specified in
Phase 2 – Preliminary Design and those services shall continue during Phase 3 - Design.
04-02-2020 P1-126 – Design SOW
Page 48 of 61
CONSULTANT shall allocate the budgeted hours between the Permitting Assistance services in
Phase 2 and Phase 3 based on when these services will be required.
3.2.9 PROJECT MANAGEMENT
A. CONSULTANT shall be responsible for managing CONSULTANT’s project execution,
schedule, budget, subconsultants, and coordination with other projects. CONSULTANT services
related to Project Management on the project are specified in Phase 2 – Preliminary Design and
those services shall continue during Phase 3 – Design as required. CONSULTANT shall
allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will
be required.
3.2.10 RISK MANAGEMENT
A. CONSULTANT shall provide risk management in accordance with Exhibit 3 - Risk
Management Requirements. Moderator shall be as specified for Phase 2 – Preliminary Design.
B. Risk Management:
☐Not required
☒Required
☒DS1 Risk Workshops: 1 hour (held during OC San’s review of DS1 at OC San)
☒DS2 Risk Workshops: 1 hour (held during OC San’s review of DS2 at OC San)
☒DS3 Risk Workshop: 2 hours (held during OC San’s review of DS3 at OC San)
3.2.11 QUALITY CONTROL
A. The CONSULTANT shall provide Quality Control requirements in accordance with Exhibit 5
- Quality Control Requirements.
☐Independent Multi-Discipline Design Workshop is not required.
☒Independent Multi-Discipline Design Workshop is required. (minimum duration of 4 days)
DESIGN WORKSHOPS AND MEETINGS
3.3.1 GENERAL
A. Workshop and meeting planning, requirements, agendas, and meeting minutes shall be in
accordance with Exhibit 4 - Workshop and Meeting Requirements.
3.3.2 DESIGN PHASE WORKSHOPS
A. The focus of workshops is to review project progress to date and the technical decisions that
have been made in focused meetings. CONSULTANT shall conduct the workshops listed below
in Phase 3 – Design. The CONSULTANT shall allow the following time for each workshop:
DESIGN PHASE WORKSHOPS
WORKSHOP TYPE DURATION
Design Kickoff Workshop 2-4 hours
Design Review Meetings 2 – 4 hours per discipline
Design Validation Meeting 2-4 hours
B. The following Design Review Meetings shall include the following topics, as applicable to the
project:
1. Electrical
2. I&C
3. Process
4. Civil/Yard
3.3
04-02-2020 P1-126 – Design SOW
Page 49 of 61
5. Construction
6. Maintainability
C. A series of workshops shall be provided for the Design Review Meetings.
D. During final design, workshops shall be held after each design submittal.
3.3.3 PRE-DS2 CONSTRUCTABILITY WORKSHOP
A. A constructability workshop shall be held prior to the DS2 submittal and shall be a 3 day
workshop. The constructability review is intended to provide OC San with an objective third-party
review of the Bid Documents for effectiveness in communicating information to prospective
bidders. The review shall determine if the Bid Documents have sufficient information needed to
bid and construct the project and avoid misunderstandings and misinterpretations that may lead
to conflict, confusion or claims during construction. This review is not a comprehensive plan
check, a dimensional check or a value engineering assignment. Further, it is recognized that
comments may only be given on the level of detail provided at this level of design.
B. Constructability review participants shall include highly experienced individuals from
construction companies, OC San construction management staff and CONSULTANT
construction management staff. Specialty Consultants and discipline engineers may also be
included.
C. Each constructability review participant shall receive a package at least two weeks in
advance. The package shall include plans and specifications, general conditions, the CPM
schedule, the construction cost estimate, permits, and other pertinent information. The
confirmation statements regarding the size-critical equipment as required in the Engineering
Design Guidelines, Chapter 01, Design Guidelines – General Requirements, Section 01.2.15.2
“Size-Critical Equipment” shall also be included in the review package.
D. The constructability review shall be held on-site.
E. Day 1 shall start with a site visit, for the reviewers to acquaint themselves with the site
conditions. After the site visit, the CONSULTANT shall make a short presentation, followed by a
question and answer period. This is anticipated to take about 1/2 day. The second half of Day 1,
Day 2, and the first half of day three shall be individual workdays for the Constructability Review
Team. The CONSULTANT shall not attend, although one designated individual from the
CONSULTANT’s Design Team shall remain to answers questions and gather additional
information that the constructability review team might need.
F. On the afternoon of Day 3, the CONSULTANT shall return and listen to comments from the
Constructability Review Team. A designated individual shall record the comments, and take
notes from the workshop, to document the process.
G. Topics the Constructability Review Team must consider shall include:
1. Project consistency, discrepancies, and constructability issues
2. Contradictions, bid package strategies, and biddability issues
3. Power outages and equipment shutdowns
4. Size critical equipment requirements and constraints
5. Utility company requirements
6. Construction methods and mitigating impacts
7. Viability of equipment relocation
8. Operational requirements
9. Interim Control Plan
10. Access for maintenance
04-02-2020 P1-126 – Design SOW
Page 50 of 61
11. Access to make proper connections
12. User-friendliness and safety
13. Coordination with other projects
14. Draft Commissioning Plan
15. Public nuisance issues
16. Risk sharing
17. Construction sequencing and schedule, materials storage and work zone accessibility
18. Clarity of the scope of work, and interface activities
19. Impacts on existing operation
20. Access
21. Cost control
22. Partnering with contractor
23. Other local conditions and constraints
H. The Constructability Review Team shall provide a list of comments and the CONSULTANT
shall respond to each comment, selecting those comments to be included in the final plans and
specifications.
I. To facilitate the Constructability Review Workshop, CONSULTANT shall complete the
following tasks:
1. Prepare package for constructability review participants. The package shall consist of
detailed plans and specifications and other information selected by CONSULTANT. The
package shall be mailed to participants at least one week prior to the workshop.
2. Arrange for off-site location for Constructability Review Workshop.
3. Provide for a constructability review facilitator.
4. Prepare presentation on the project for the Constructability Review Team.
5. Meet with Constructability Review Team to receive comments.
6. Provide listing of constructability review comments and action taken on each comment.
(The summary report of constructability review comments shall be prepared by the
Constructability Review Team.)
J. All comments and recommendations of the workshop shall be incorporated into the Bid
Documents at no additional cost to OC San.
K. Prior to DS3, the Commissioning Team shall also conduct an additional constructability
review of the final Bid Documents to review clarity of the bid package, project completeness, and
other issues, as necessary.
3.3.4 DESIGN PHASE MEETINGS
A. Technical Progress Meetings
1. Technical Progress Meetings shall be held every 2 weeks to review various issues with
OC San’s project team. The CONSULTANT shall coordinate with the OC San Project
Manager to determine what topics will be covered in what meetings, and what OC San and
CONSULTANT team members are required for each.
B. Focused Meetings
04-02-2020 P1-126 – Design SOW
Page 51 of 61
1. Focused meetings shall be held throughout design to discuss specific issues in detail
and generate comments and direction from OC San staff. The following tentative list of
topics may be covered in these meetings:
a. Site survey
b. Site utility coordination
c. Geotechnical report
d. Quality control plan
e. Common names for facilities and equipment
f. Process Flow diagram/Operating Philosophy (several meetings as needed)
g. Permits
h. Confined space and other safety requirements
i. Fire Department requirements
j. Fire protection
k. Landscaping plan
l. Architectural concepts
m. Survey and geotechnical requirements
n. Potholing
o. Hazardous Area classification (with OC San Authority Having Jurisdiction
representative participating)
p. Utilities and utility tie-ins
q. Technical Definitions/equipment data sheets
r. Control concepts
s. Instrumentation and control upgrades
t. Sample P&ID; basis for equipment tag numbering
u. Sample control descriptions
v. Sample EID database
w. Sample SAT database
x. Data network block diagram/network connection diagram
y. I/O relocation plan
z. Electrical distribution system, system controls and the related upgrades
aa. Single-line diagrams and electrical demolition
bb. Modes and analyses cases for electrical studies
cc. Criticality table update
dd. Standby power
ee. Construction sequencing
ff. Special studies
gg. Coordination with other projects
hh. Additional meetings as necessary
04-02-2020 P1-126 – Design SOW
Page 52 of 61
2. Each meeting shall generally be 2-4 hours in length. CONSULTANT shall determine
how many meetings will be needed to cover these topics. CONSULTANT may suggest
additional topics as necessary. Supplementary meetings may be scheduled with OC San
staff, as necessary to allow coordination between the CONSULTANT and OC San staff.
3.3.5 CONSULTANT OFFICE TECHNICAL MEETINGS (COTMS)
A. OC San has found it mutually beneficial to visit the CONSULTANT offices from time to time
to observe the detailed design in process, answer detailed technical questions, and establish
lines of communications with CONSULTANT staff. During the Design Phase, CONSULTANT
shall arrange for OC San staff to meet in CONSULTANT’s work center and audit “over the
shoulder” design reviews with CONSULTANT’s staff. The reviews will be monitored by a
member of CONSULTANT’s Management Team. Signification decisions will be reported to
Consultants Project Manager and OC San’s Project Manager and logged into the Decision Log.
Action items will be identified.
B. The CONSULTANT shall schedule, at a minimum, the following CONSULTANT Office
Technical Meetings (COTMs):
1. One four-hour visit to review the Loop Tag Number scheme and control documentation.
2. Three four-hour visits to review CONSULTANT Implementation of CAD standards and
P&ID tag extraction.
3. Two four-hour visits to review the first few P&ID drawings.
4. Two four-hour visits to review the early Control Strategies.
5. One four-hour visit to establish the basic control panel design.
6. One four-hour visit to review the Conduit, Tray and Cable Schedules
7. One four-hour visit to review each of the first elementary diagrams, first panel
schematics.
8. Six two-hour follow up visits for the above.
9. One six-hour visit to review each of the SAT and EID products, including P&ID, SAT and
EID coordination.
C. The CONSULTANT shall schedule each of the above COTMs and shall coordinate with OC
San’s Project Manager to be sure the correct personnel participate in the meetings. The
CONSULTANT may propose additional, eliminate, or combine COTMs as needed to support the
detailed design.
D. OC San may also request additional “over the shoulder” design review meetings to audit the
design in other areas not listed above. CONSULTANT shall anticipate that OC San will request
review of the technical progress of the work in “over the shoulder” meetings at a minimum, prior
to every design submittal.
3.3.6 COORDINATION WITH OTHER PROJECTS MEETINGS
A. The project shall be a complete and fully functional facility that is integrated with existing
facilities and coordinated with other construction projects. CONSULTANT shall coordinate
potential conflicts with the following adjacent projects and participate in the number of meetings
indicated in the following table:
04-02-2020 P1-126 – Design SOW
Page 53 of 61
PROJECT COORDINATION MEETINGS
PROJECT PROJECT DESCRIPTION COORDINATION MEETINGS
P1-140 Activated Sludge-1 and
Secondary Clarifier
Rehabilitation
2 meetings @ 1.5 hours
P1-105 Headworks Rehabilitation at
Plant 1
2 meetings @ 1.5 hours
Other projects coordination Other projects coordination 4 meetings @ 1 hour
3.3.7 COMMISSIONING TEAM MEETINGS
A. Design phase commissioning team meetings shall be held on a monthly basis after
completion of OC San’s review DS2.
B. Meetings will generally be 2-4 hours in length. CONSULTANT shall determine how many
meetings shall be needed to cover these topics and organize the topics accordingly.
CONSULTANT may suggest additional topics as necessary. Supplementary meetings may be
scheduled with OC San staff, as necessary, to allow coordination between CONSULTANT and
OC San staff.
C. The Commissioning Team meetings shall cover the following subjects:
1. Provide a detailed review of the proposed construction sequencing plan and make
recommendations for improvements. These recommendations shall be incorporated into the
plans and specifications as appropriate. Possible incentives for the Contractor to finish the
project early shall be explored.
2. Identify procedures, testing requirements and sequencing for commissioning.
3. Develop a detailed outline of the commissioning plan to be incorporated into the
Commissioning Procedures specification based on the results of the recommended
construction sequencing plan.
4. Prepare testing requirements and plan to prove process performance relative to design
criteria developed in the PDR. Testing shall be performed after the RAT and supervised by
the CONSULTANT.
5. Identify timing within the construction contract schedule when commissioning activities
are required, including hold points for testing and inspection.
6. Identify roles and responsibilities of the Project Manager, Resident Engineer, Inspector,
Project Engineer, PCI, Engineering support, Design CONSULTANT and Contractor.
7. Develop a timeline of commissioning
8. Develop a commissioning specification
9. Develop standard forms for testing and commissioning documentation
10. Electrical, mechanical and process tie-ins
11. Startup requirements and testing
12. O&M training
3.3.8 SAFETY AND RISK MEETING
A. Meet with OC San Safety and Risk Management personnel between DS2 and DS3 to review
the plans and specifications in accordance with OC San safety policies and OC San Risk
Management goals.
04-02-2020 P1-126 – Design SOW
Page 54 of 61
3.3.9 CONSTRUCTION SUBMITTAL ITEMS LIST MEETING
A. Meet with OC San between DS2 and DS3 to review the CONSULTANT’s approach to
developing the project Construction Submittal Items List using Exhibit 17 and the
CONSULTANT-provided specifications and discuss the grouping of submittals in commissioning
packages and phases.
3.3.10 STORMWATER COMPLIANCE MEETING
A. A formal meeting shall be held with OC San’s stormwater compliance staff to review the
project scope and identify all issues during and after construction affecting compliance with
stormwater regulatory requirements and OC San’s policies and practices.
BID PHASE SUPPORT SERVICES
3.4.1 BID PHASE SUPPORT SERVICES
A. CONSULTANT shall provide the following bid period services:
1. Participate in the pre-bid meeting.
2. Prepare project drawing set and project specification addenda to provide clarification
and resolve errors and omissions identified prior to bid opening.
3.4.2 BID EVALUATION ASSISTANCE
A. Participate in reviewing alternate equipment proposals from the Contractor, if applicable.
B. Participate in the evaluation of the submitted bids, furnish consultation and advice to OC
San staff and assist with all the related equipment, cost, and other analyses as required to
finalize the award decision.
3.4.3 CONFORMED DOCUMENT PREPARATION
A. Within two weeks of the bid date, prepare conformed documents set (drawings, databases,
specifications and other required materials) that incorporates the addenda. See Engineering
Design Guidelines, Chapter 01, Design Guidelines – General Requirements, Section 01.4
“Preparation of Project Deliverables” for requirements as modified in Section V of this Scope of
Work, “Project-Specific Deviations from OC San Design Guidelines” and the requirements of the
CAD Manual).
4. PHASE 4 – CONSTRUCTION AND INSTALLATION SERVICES
Not in this Scope of Work.
5. PHASE 5 – COMMISSIONING SERVICES
Not in this Scope of Work.
6. PHASE 6 – CLOSE OUT
Not in this Scope of Work.
7. GENERAL REQUIREMENTS
GENERAL
7.0.1 OC SAN ENGINEERING DESIGN GUIDELINES AND STRATEGIC PLAN
A. CONSULTANT shall refer to and adhere to the requirements of OC San Safety Standards,
OC San Engineering Design Guidelines, any deviations to the Engineering Design Guidelines
listed below, and other OC San’s Design Standards referenced therein. Exhibit 15 - Spec
Review using Microsoft Word and Teams
3.4
7.0
04-02-2020 P1-126 – Design SOW
Page 55 of 61
B. Exhibit 16 - OC San Engineering Design Guidelines and Standards – Available online
at https://www.OC San.com/about-us/transparency/document-central/-folder-917 is a complete
set of the OC San Safety Standards and OC San Design Standards, the latest edition at the time
of the design proposal stage.
C. The Engineering Guidelines define what plant design concepts/tools/methods and project
management requirements shall be adhered to and in what manner they shall be used/provided
by Consultants, e.g., requirements regarding design concepts, submittals, documentation
details, use of OC San Master Specifications, and other related OC San Standards, etc.
D. Refer also to Section “CONSULTANT’s Responsibilities” in OC San Engineering Design
Guidelines Chapter 01. Refer to “Master Specifications Instructions for Use” that mandates rules
and conventions to be used in all OC San project specifications.
E. The project Scope of Work defines whether or not each specific deliverable described in the
Guidelines shall be part of the project and when each task shall take place.
F. The project Scope of Work also includes requirements that supplement and/or modify the
Guidelines requirements for this project.
G. The project Scope of Work and OC San Engineering Design Guidelines impact
CONSULTANT’s project cost.
H. Except as specified in this Scope of Work, design of all facilities shall conform to the
recommendations of the currently approved Master Plan for OC San facilities. The project shall
also incorporate all applicable mitigation measures included in associated environmental
documents and site-specific local requirements.
I. In addition, OC San will require the CONSULTANT to follow subsequent revisions of OC
San Safety Standards, OC San Engineering Design Guidelines and other OC San Design
Standards up to transmittal by OC San of comments on Design Submittal 1, shall be
incorporated into the Design by CONSULTANT with no increase in CONSULTANT’s Not-to-
Exceed upper limit on fees.
J. OC San may update OC San’s Master Specifications and/or add new OC San Master
Specifications up to transmittal by OC San of comments on Design Submittal 2. The
CONSULTANT shall utilize the new and/or modified Master Specifications for the DS3 submittal.
K. The CONSULTANT shall not begin editing the project specifications until the project team
meets with OC San’s Design Standards Custodian to discuss and receive comments regarding
the CONSULTANT’s proposed list of project specifications. This meeting will be used to
determine which specifications are to use OC San’s master specifications, and where other
sources will be utilized.
7.0.2 PROJECT PHASES AND TASKS
A. Project tasks and deliverables shall include the requirements described in this Scope of
Work. CONSULTANT shall also refer to Appendix A of OC San Engineering Design Guidelines
for the level of detail requirements for individual deliverables in each Phase of the project not
covered in the Scope of Work.
7.0.3 CONSTRUCTION SEQUENCING AND CONSTRAINTS
A. CONSULTANT shall develop with OC San staff and include in the Bid Documents detailed
requirements for construction sequencing and constraints. These shall ensure safe and reliable
operation and maintenance of OC San facilities. The facilities must be kept on-line and fully
operational with minimal interruptions throughout construction.
7.0.4 WORKING HOURS
A. Meetings with OC San staff shall be scheduled from Monday through Thursday between the
hours of 8:00 AM and 4:00 PM. Any CONSULTANT staff working on-site shall conform to OC
--
04-02-2020 P1-126 – Design SOW
Page 56 of 61
San work schedules. CONSULTANT shall refer to the Engineering Design Guidelines, Chapter
01, Section 01.3.5 “CONSULTANT Inspection of Treatment Facilities” for further requirements.
7.0.5 STANDARD DRAWINGS AND TYPICAL DETAILS
A. All the details used in the project (OC San’s Standard Drawings and CONSULTANT-
developed typical details) shall be shown on the Plans.
7.0.6 SOFTWARE
A. The CONSULTANT is expected to develop and provide the deliverables using the standard
software currently approved for use by OC San. The standard OC San software includes, but is
not limited to, the following:
B. Any software that the CONSULTANT needs to comply with these standards shall be
purchased and maintained by the CONSULTANT at no additional cost to OC San. In the event
OC San provides the CONSULTANT with access to OC San software and hardware at an OC
San facility in order to facilitate performance of their work, all software shall remain the property
of OC San. Only software licensed to OC San shall be installed on OC San equipment. In
addition, only OC San IT Department staff will perform the installation of this software.
C. Refer to Chapters 10 and 11 and Appendix A of OC San Engineering Design Guidelines for
requirements on preparation of Criticality Tables and ETAP, SAT, and EID databases. Refer to
OC San CAD Manual and to Chapter 11 and Appendix A of OC San Engineering Design
Guidelines for requirements regarding P&ID drawings.
7.0.7 SUBMITTAL REVIEW USING BLUEBEAM
A. OC San has standardized on the use of Bluebeam Revu for reviewing and providing
comments to PDF files. PDF files will be hosted in a Bluebeam cloud-based studio session for
review. See Exhibit 14 - Bluebeam Designer User Training for a detailed explanation on how
Bluebeam will be used to provide, validate, and close submittal review comments.
B. Prior to submitting electronic PDF files, format them as indicated in Exhibit 13 - Bluebeam
Designer Training for Submission and “OC San CAD Standards Manual” prior to submission.
C. A one-hour training session on the use of Bluebeam and custom status menu will be
provided by OC San. All Consultant team members responsible for quality control and
reconciliation of submittal comments shall attend.
7.0.8 WORD TRACK CHANGES
A. Specifications documents and other MS-Word based deliverables will be hosted in OC San
Teams environment for review. The guidelines for reviewing and commenting on MS-Word files,
including Specifications reviews, can be found in Exhibit 15 - Spec Review using Microsoft
Word and Teams.
7.0.9 GIS SUBMITTALS
A. Consultant shall provide the following GIS deliverables propagated from approved design
submittals after the design submittal is accepted. These GIS submittals will not be reviewed or
presented by Consultant. The purpose is to provide project specific GIS layers that could be
used to visualize interproject dependencies and conflicts.
1. Electronic Submittal
a. Kmz files for use with Google Earth
2. Final PDR
a. Single project boundary (Polygon)
(1) Boundary to encompass all new facilities and existing to be modified including:
· Buildings\Structures
04-02-2020 P1-126 – Design SOW
Page 57 of 61
· Tunnels
· Utilities
· Pavement
· Street boundary (ROW to ROW) of possible alignment
b. Structures (Polygon)
· New structure outline
· Additions to existing structures
· Structure label
3. DS1
a. Project boundary - updated from PDR
b. Structures - updated from PDR
c. Utilities (Polyline)
(1) Utility alignment
d. Manholes (Point)
e. Excavation of pits (Polygon)
(1) Pits that will stay open for extended duration
(2) CIPP
(3) Tunnel - jacking and receiving
(4) All pits should be labeled
4. DS2, DS3, and FDS
a. Project boundary - updated from previous DS
b. Structures - updated from previous DS
c. Utilities - updated from previous DS
d. Manholes - updated from previous DS
e. Excavation of pits - updated from previous DS
f. Critical (as defined by Dig Alert) utility crossings (Point)
(1) Crossing of Dig Alert critical utilities
(2) Critical utility label
· Natural gas
· Fuel pipeline
· 12 kV Electrical
g. Asphalt (Polygon)
(1) Asphalt to be replaced
7.0.10 PMWEB PROCEDURES
A. This Agreement shall utilize PMWeb as the Project Control Management System (PCMS) for
overall management of the Agreement. All PCMS related documents requiring formal signatures
shall be digital, and all copies digitally distributed. The PCMS conforms to the requirements set
forth in California Government Code section 16.5 regarding digital signatures; therefore, digital
04-02-2020 P1-126 – Design SOW
Page 58 of 61
signatures are in full force and effect and are legally the same as a hand-written signature. At
least one PCMS account shall have the authority to approve Amendments.
OC SAN shall maintain the PCMS and serve as the administrator for the duration of this
Agreement. OC SAN will provide the CONSULTANT with user access for approved personnel
as needed for the duration of the Agreement. OC SAN shall control access to the PCMS by
assigning user profiles and login credentials. Notify OC San of any changes to personnel.
Access modifications shall be coordinated as needed throughout the Agreement. Do not to
share PCMS account passwords with anyone inside or outside of the company.
Routine maintenance of the PCMS system may be required during the Agreement. Access to
the PCMS system may be restricted or unavailable at these times and will be scheduled outside
of typical working hours whenever possible.
The PCMS is a web-based environment and is therefore subject to the inherent speed and
connectivity problems of the Internet. The CONSULTANT is responsible for its own connectivity
to the Internet. PCMS response time is dependent on the CONSULTANT’s equipment, including
processor speed, Internet access speed, Internet traffic, etc.
OC SAN will not be liable for any delays associated with the utilization of the PCMS including,
but not limited to: slow response time, down time periods, connectivity problems, or loss of
information.
The OC SAN will provide a one-time free training session of up to two (2) hours to train
CONSULTANT’s designated staff on general system requirements, procedures, and methods.
Automated system notifications generated via PCMS (e.g. in-system notices, system generated
email, or email with attachment) shall constitute a formal written notification in compliance with
the Professional Design Service Agreement (PDSA), Professional Construction Service
Agreement (PCSA), or Task Order (TO) Agreement.
8. PROJECT-SPECIFIC DEVIATIONS FROM OC SAN DESIGN
GUIDELINES
The following Scope sections change the Engineering Design Guidelines requirements for this project
and apply to ALL its Project Elements:
ENGINEERING DESIGN GUIDELINES CHAPTER 01, “DESIGN
GUIDELINES – GENERAL REQUIREMENTS”
8.0.1 SECTION 1.2.15 “MISCELLANEOUS REQUIREMENTS”
A. Section 4 “Pipe Supports”
1. Replace the entire section with the following:
CONSULTANT shall design pipe supports for pipes 12" and greater diameter.
Regardless of pipe size, CONSULTANT shall design improvements to existing pipe
supports (additional anchorage, support members, and/or bracing) where new conduit
and/or pipes are added that increase the supported gravity load by 5% or more, or
lateral seismic load by 10% or more. This condition could apply to some of the existing
pipe supports in the tunnels. No rehabilitation or replacement of any other supports were
assumed to be included. Design, calculations and drawings assumed for existing
tunnels are:
Civil tunnel plans assumed to have call outs to structural detail sheets for tunnel pipe
supports – three structural detail sheets for tunnel pipe supports are assumed. No
structural plan and section view sheets are assumed.
8.0
04-02-2020 P1-126 – Design SOW
Page 59 of 61
For individually routed pipes that are less than 12” diameter, the majority of pipe support
locations will not be shown. However, the drawings will indicate required pipe support
locations for specific instances that require special attention for access and
maintenance. Specific pipe support details will not be called out at these locations since
the pipe supports will be designed by the Contractor. To ensure adequate maintenance
access is maintained, the design documents will include notes to indicate that no pipe
supports are to be placed in maintenance access spaces.
8.0.2 ENGINEERING DESIGN GUIDELINES CHAPTER 06, “MECHANICAL DESIGN”
A. Section 06.7 “Vibration Analysis for Rotating Electrical Equipment”
1. Replace the entire section with the following:
CONSULTANT shall perform a RUN evaluation for all pumping systems according to
ANSI/HI 9.6.8-2014 or latest (Rotodynamic Pumps—Guideline for Dynamics of Pumping
Machinery), to assess various vibration related phenomena. RUN is the general term
used to denote the quantity obtained from multiplying the Risk (R) value and Uncertainty
(U) value determined during the appropriate evaluation. This evaluation will help
determine the relevant analysis level required to appropriately evaluate pumping
machinery construction attributes and relevant site characteristics. CONSULTANT shall
obtain (from the manufacturers of the rotating equipment) or calculate (based on
anticipated turning speeds, operational requirements, etc.) the relevant equipment and
system natural and/or excitation frequencies. These frequencies will include any effect
from the various torsional, lateral, and structural behaviors of the equipment or system.
All other rotating equipment such as fans, blowers, compressors, and pumps/equipment
not covered by other standards or specifications, etc. shall undergo a similar evaluation
to determine relevant risk and analysis requirements to ensure project success and
reliability targets are met. For these other types of rotating equipment not covered by
other standards or specifications, the CONSULTANT shall propose a plan for OC San to
approve prior to analysis being performed accordingly.
For the purpose of estimating level of effort, the Risk Value, “R”, for critical equipment
that is required for continuous operation of a process system or where standard
equipment is modified slightly for this application, a R-Value of 4 should be assumed.
For systems dedicated to a redundant process train or where standard equipment is
used, a R-Value of 2 should be assumed.
The results from the above RUN evaluation shall be used by the CONSULTANT in their
subsequent design, to help provide a robust solution for the project needs. Iterations of
design and equipment substitutions shall trigger additional RUN evaluations and
analysis, as needed. Final equipment acceptability and commissioning shall be per
ANSI/HI 9.6.4-2009 or latest (Rotodynamic Pumps—for Vibration Measurements and
Allowable Values), applicable Part of ISO 10816 latest (Mechanical Vibration),
ANSI/AMCA 204-05:2012 or latest (Balance Quality and Vibration Levels for Fans), ISO
1940-1:2003 or latest (Mechanical Vibration—Balance Quality Requirements for Rotors
in a Constant (Rigid) State), and ISO 21940-12:2016 or latest (Mechanical Vibration—
Rotor Balancing—Procedures and Tolerances for Rotors with Flexible Behavior) as
applicable. In addition, all loads, forces and moments imparted to equipment or piping,
including resonance, shall be fully mitigated and all usage cases analyzed and
documented per ASME 31.3-2018 or latest (Process Piping) at a minimum, and properly
designed within applicable allowable stresses, etc. If there are conflicts in the standards
specified, the more stringent value or condition to prevail.
8.0.3 NOT USED
04-02-2020 P1-126 – Design SOW
Page 60 of 61
8.0.4 ENGINEERING DESIGN GUIDELINES, CHAPTER 11, “INSTRUMENTATION AND
CONTROL”
A. Section 11.4.1 “Requirements Study”
1. The Requirements Study shall not be part of the Scope of Work.
9. STAFF ASSISTANCE
OC San staff member or designee assigned to work with CONSULTANT on the design of this project is
Bob Tran at (714) 593-7463, e-mail to: btran@ocsan.gov.
10. EXHIBITS
Exhibit 1 - Preliminary Design Report Requirements
Exhibit 1 - Design Requirements
Exhibit 2 - Project Management Requirements
Exhibit 3 - Risk Management Requirements
Exhibit 4 - Workshop and Meeting Requirements
Exhibit 5 - Quality Control Requirements
Exhibit 6 - Design Submittal Requirements Matrix
Exhibit 7 - Project Schedule Calculation
Exhibit 8 - Deliverables Quantities
Exhibit 9 - Sample Construction Cost Estimate Format
Exhibit 10 - Sample Full Project Safety Review Plan
Exhibit 11 - Sample Risk Management Check List
Exhibit 12 - Sample MMRP Log
Exhibit 13 - Bluebeam Designer Training for Submission
Exhibit 14 - Bluebeam Designer User Training
Exhibit 15 - Spec Review using Microsoft Word and Teams
Exhibit 16 - OC San Engineering Design Guidelines and Standards – Available online at
https://www.OC San.com/about-us/transparency/document-central/-folder-
917
Exhibit 17 - Not Used
Exhibit 18 - Project Reference Material
· P1-20 Headworks No. 2 at Plant No. 1 Record Drawings – 1987
· Plant No. 1 Hydraulic Map
· P1-126 Concept Report
· PS19-02 Circular Primary Clarifier Replacement Phasing Study at Plant No. 1
Final Report
· SP-173 Appendix H Hydraulic Model Final Report
· SP-173 Appendix H Hydraulic Model Reference Files (Example only, not full
set)
04-02-2020 P1-126 – Design SOW
Page 61 of 61
· PS17-09 Peak Flow Calibration of Plant 1 and Plant 2 - Infoworks Model Final
Report
· P2-98A Primary Clarifier Cover Drawings
· P1-101 East Perimeter Road Pipe Rack Drawings
· Single Line Drawings
Exhibit 19 - Sample Criticality Data Table
Exhibit 20 - Commissioning Procedure Training
Exhibit 21 - ORT Procedure Examples
Exhibit 22 - Pre-FAT Procedure Examples
Exhibit 23 - Sample FAT Procedure
Exhibit 24 - Sample RAT Procedure
Exhibit 25 - Project J-47 Cable Tray Improvements Preliminary Design Report for Plant
No. 1
Exhibit 26 – Not Used
Exhibit 27 - Cable Conduit and Tray Schedule Database
BT:AB:sa
3/29/2022
1
Primary Sedimentation Basins No. 3‐5
Replacement at Plant No. 1
Project No. P1‐126
Presented by:
Don Cutler
Engineering
Supervisor
Operations
Committee
April 6, 2022
Consultant Award
2
What is Primary Sedimentation?
Primary Sedimentation
1
2
Raw Sewage
3/29/2022
2
3
Project Overview
Boardroom
Rectangular
Basins
Primary
Treatment
Odor Control
Circular
Basins
Project No. P1‐126
4
•Circular basins are in very poor condition
•60+ years old
What
is the
Problem?
3
4
3/29/2022
3
5
What is the Problem?
6
Proposed Solution
Replace Odor
Control
Replace Circular
Basins
1
2
Demolish
Clarifiers 1 and 2
4
Remove Primary
Effluent Pump Station
5
Replace/Rehab
Pipes and Boxes
3
Secondary
Treatment
5
6
3/29/2022
4
7
Construction Cost Increase
•Construction estimate increased
•$75M (Original) $119M (Updated)
2017
Concept Report
$67M
2021
Add Odor Control
$75M
2022
PDSA RFP
Consultants Indicate
Construction
Estimate Low
2022
OC San Reviews and
Validates New
Estimate
$119M
8
Proposed Budget
Proposed Budget* $183 Million
Construction $119 Million
Non‐construction cost $ 64 Million
* To be requested as part of the FY 22‐23 and 23‐24 Budget
Current Budget $127 Million
7
8
-----,
3/29/2022
5
9
•Three proposals received
•Interviews conducted with top two firms
•Black & Veatch selected
Selection
Process
10
•Project management hours adjusted to allocate less to
senior level staff
•Meeting and workshop assumptions coordinated to
reduce overall effort
•Various minor additions to scope
Negotiations
Original Proposal Negotiated
Total Hours 69,996 70,451
Total Fee $15,404,103 $14,163,000
9
10
3/29/2022
6
11
Recommend to the Board of Directors to:
A. Approve a Professional Design Services Agreement
with Black & Veatch to provide engineering
services for Primary Sedimentation Basins No. 3‐5
Replacement at Plant No. 1, Project No. P1‐126,
for an amount not to exceed $14,163,000; and
B. Approve a contingency of $1,416,300 (10%).
Recommendation
Questions
?
12
11
12
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2021-1970 Agenda Date:4/6/2022 Agenda Item No:5.
FROM:James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
SANTA ANA TRUNK SEWER REHABILITATION, PROJECT NO. 1-23
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Recommend to the Board of Directors to:
A. Approve a Professional Design Services Agreement with Stantec Consulting Services, Inc. to
provide engineering services for Santa Ana Trunk Sewer Rehabilitation, Project No. 1-23, for
an amount not to exceed $3,880,000; and
B. Approve a contingency of $388,000 (10%).
BACKGROUND
The Santa Ana Trunk, which carries sewage from the southern portion of Santa Ana and the northern
portion of Costa Mesa to Orange County Sanitation District (OC San) Plant No. 1, was originally
constructed in the early 1950s. Several projects have replaced or rehabilitated small portions of the
pipe and rehabilitated the majority of the manholes in the past 60 years.
The project area for the Santa Ana Trunk Sewer Rehabilitation is located in Alton Avenue heading
west from Bristol Street then diagonally through easements in a light industrial/commercial area
toward Plant No. 1. The Santa Ana Trunk sewer is constructed of unlined 42-inch and 48-inch
diameter reinforced concrete pipe.
RELEVANT STANDARDS
·California Government Code §4526: Select the “best qualified firm” and “negotiate fair and
equitable fees”
·Protect OC San assets
·Commitment to safety & reducing risk in all operations
PROBLEM
Closed circuit television inspections and corrosion assessments revealed severe defects, including
exposed aggregate, exposed reinforcement steel and infiltration in the pipelines, as well as exposed
aggregate and liner detachment in some manhole structures.
Orange County Sanitation District Printed on 3/29/2022Page 1 of 4
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
File #:2021-1970 Agenda Date:4/6/2022 Agenda Item No:5.
PROPOSED SOLUTION
Award a Professional Design Services Agreement for Project No.1-23 to rehabilitate the corroded
sewer pipelines and manholes for the Santa Ana Trunk Sewer north of Interstate 405.The design
will rehabilitate approximately 15,000 feet of sewers and associated manholes.Construction of the
project is expected to require significant bypass pumping,which requires careful design and
coordination with neighbors and businesses to minimize public impacts.
TIMING CONCERNS
The schedule driver for this project is to resolve the current deficiencies to reduce the risk of pipeline
failure.
RAMIFICATIONS OF NOT TAKING ACTION
Without this project, the pipeline is at risk of failure, which would cause a major sewage spill.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
Consultant Selection:
OC San requested and advertised for proposals for Santa Ana Trunk Sewer Rehabilitation,Project
No.1-23,on October 14,2021.The following evaluation criteria were described in the Request for
Proposals and used to determine the most qualified Consultant.
CRITERION WEIGHT
Project Understanding and Approach 40%
Related Project Experience 35%
Project Team and Staff Qualifications 25%
Four proposals were received on December 14,2021 and evaluated in accordance with the evaluation
process set forth in OC San’s Purchasing Ordinance by a pre-selected Evaluation Team consisting of
OC San staff:CIP Project Manager,Senior Engineer,two Engineering Supervisors,and a
Maintenance Supervisor.The Evaluation Team also included one non-voting representative from the
Contracts Administration Division.
The Evaluation Team scored the proposal on the established criteria as summarized in the table
below:
Firm Approach (Max
40)
Related
Experience
(Max 35)
Team (Max
25)
Total Score
(Max 100)
1 AECOM Technical
Services, Inc.
36 27 21 84
2 Stantec Consulting
Services, Inc.
35 29 19 83
3 Atkins North America, Inc.22 20 13 55
4 Carollo Engineers, Inc.23 18 13 54
Orange County Sanitation District Printed on 3/29/2022Page 2 of 4
powered by Legistar™
File #:2021-1970 Agenda Date:4/6/2022 Agenda Item No:5.
Firm Approach (Max
40)
Related
Experience
(Max 35)
Team (Max
25)
Total Score
(Max 100)
1 AECOM Technical
Services, Inc.
36 27 21 84
2 Stantec Consulting
Services, Inc.
35 29 19 83
3 Atkins North America, Inc.22 20 13 55
4 Carollo Engineers, Inc.23 18 13 54
Based on this scoring,two Consultants were shortlisted for interviews on January 12,2022.
Following the interview,each member of the Evaluation Team scored the Consultants based on both
the proposals and interviews using the evaluation criteria and weighting described above.Based on
the scoring shown below,Stantec Consulting Services,Inc.was selected as the most qualified
Consultant.
Firm Approach (Max
40)
Related
Experience
(Max 35)
Team (Max
25)
Total Score
(Max 100)
1 Stantec Consulting
Services, Inc.
39 31 22 92
2 AECOM Technical
Services, Inc.
34 29 18 81
Stantec Consulting Services,Inc.,the proposer with the highest score,demonstrated a clear
understanding of the Scope of Work by highlighting key challenges for each element and providing
potential mitigation solutions,has a proven team with great experience on similar projects,and
showed an understanding of the decisions that need to be made during Preliminary Design to start
Design with a well-defined scope.Their approach to develop a detailed implementation plan and get
buy-in from stakeholders in preliminary design mitigates major risks for this project.Therefore,the
Evaluation Team determined that Stantec Consulting Services,Inc.is the most qualified firm to
complete the Scope of Work.
Review of Fee Proposal and Negotiations:
Proposals were accompanied by sealed fee proposals.In accordance with the Purchasing
Ordinance,the fee proposal of only the highest-ranked firm was opened after approval by the
Director of Engineering of the Evaluation Committee’s recommendation.
To meet the goals and objectives of the Project,on January 18,2022,the Evaluation Team began
negotiations with Stantec Consulting Services,Inc.to clarify the requirements of the Scope of Work,
the assumptions used for the estimated level of effort,and the proposed approach to meet the goals
and objectives for the project.Negotiations included multiple meetings and emails to verify
assumptions and level of effort,resulting in an increase in the level of effort of 18 tasks by
approximately $385,000,a decrease in the level of effort of 15 tasks by approximately $173,000,and
a net increase of approximately $212,000.
During negotiations,the design schedule duration was decreased by three weeks,a total of 28
Orange County Sanitation District Printed on 3/29/2022Page 3 of 4
powered by Legistar™
File #:2021-1970 Agenda Date:4/6/2022 Agenda Item No:5.
During negotiations,the design schedule duration was decreased by three weeks,a total of 28
drawings were added,the level of effort for Preliminary Design was increased,field activity and
environmental documentation assumptions were refined,and scope was added for air pressure
monitoring to aid in the design of air jumpers.
The following table summarizes how the estimated level of effort was revised through the
negotiations process.
Original Fee Proposal Final Fee Proposal
Number of Drawings 135 163
Total Hours 15,425 17,211
Total Fee $3,667,767 $3,880,000
The Consultant’s fringe and overhead costs,which factor into the billing rate,have been
substantiated.The contract profit is 5.88%,which is based on an established formula based on OC
San’s standard design agreements.Staff is requesting a 10 percent contingency to address
revisions as the project progress through preliminary and final design.
Based on the above,staff has determined that the final negotiated fee is fair and reasonable for the
level of effort required for this project and recommends award of the Professional Design Services
Agreement to Stantec Consulting Services, Inc.
CEQA
The project is exempt from CEQA under Class 1,2,and 3 categorical exemptions set forth in
California Code of Regulations Sections 15301,15302,and 15303.A Notice of Exemption will be
filed with the OC Clerk-Recorder after OC San Board of Directors approval of the Construction
Contract.
FINANCIAL CONSIDERATIONS
This request complies with authority levels of OC San’s Purchasing Ordinance.This item has been
budgeted,(Budget Update,Fiscal Year 2021-2022,Appendix A,Page A-7,Santa Ana Trunk Sewer
Rehabilitation, Project No. 1-23) and the project budget is sufficient for the recommended action.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Professional Design Services Agreement
·Presentation
VP:jw
Orange County Sanitation District Printed on 3/29/2022Page 4 of 4
powered by Legistar™
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 1 of 19
PROFESSIONAL DESIGN SERVICES AGREEMENT
This PROFESSIONAL DESIGN SERVICES AGREEMENT, (hereinafter referred to as “Agreement”), is made and entered into to be effective the 27th day of April, 2022 by and between the ORANGE COUNTY SANITATION DISTRICT, (hereinafter referred to as "OC
SAN"), and STANTEC CONSULTING SERVICES INC., (hereinafter referred to as "CONSULTANT"). WITNESSETH: WHEREAS, OC SAN desires to engage CONSULTANT for Project No. 1-23, Santa Ana Trunk Sewer Rehabilitation; and to provide professional design services for rehabilitation of pipelines (lining) and manholes of a portion of the Santa Ana Trunk Sewer, (Services) and WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the necessary professional services; and WHEREAS, OC SAN has adopted procedures for the selection of professional design
services and has proceeded in accordance with said procedures to select CONSULTANT to perform the Services; and
WHEREAS, at its regular meeting on April 27, 2022, the Board of Directors, by Minute Order, accepted the recommendation of Operations Committee pursuant to OC SAN’s Ordinance No. OC SAN-56 to approve this Agreement. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows: 1. SCOPE OF WORK CONSULTANT agrees to furnish necessary professional and technical services to accomplish those project elements outlined in the Scope of Work attached hereto as Attachment “A", and by this reference made a part of this Agreement. A. The CONSULTANT shall be responsible for the professional quality, technical
accuracy, completeness, and coordination of all design, drawings, specifications, and other services furnished by the CONSULTANT under this Agreement, including the work performed by its subconsultants (Subconsultants). Where
approval by OC SAN is indicated, it is understood to be conceptual approval only and does not relieve the CONSULTANT of responsibility for complying with all laws, codes, industry standards, and liability for damages caused by errors, omissions, noncompliance with industry standards, and/or negligence on the part of the CONSULTANT or its Subconsultants. B. CONSULTANT is responsible for the quality of work prepared under this Agreement and shall ensure that all work is performed to the standards of best engineering practice for clarity, uniformity, and completeness. CONSULTANT shall respond to all of OC SAN’s questions, comments, suggestions, corrections, and recommendations (i.e., DS1, DS2, DS3, and FDS). All comments shall be
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 2 of 19
incorporated into the design prior to the next submittal deadline or addressed, in writing, as to why the comment has not been incorporated. CONSULTANT shall
ensure that each submittal is 100% accurate for the level of work submitted (i.e., correct references, terms, capitalization, or equal status, spelling, punctuation, etc.)
C. In the event that work is not performed to the satisfaction of OC SAN and does not conform to the requirements of this Agreement or any applicable industry standards, the CONSULTANT shall, without additional compensation, promptly correct or revise any errors or deficiencies in its designs, drawings, specifications, or other services within the timeframe specified by the Project Engineer/Project Manager. OC SAN may charge to CONSULTANT all costs, expenses and damages associated with any such corrections or revisions. D. All CAD drawings, figures, and other work shall be produced by CONSULTANTS and Subconsultants using OC SAN CAD Manual. Conversion of CAD work from any other non-standard CAD format to OC SAN format shall not be acceptable in
lieu of this requirement. Electronic files shall conform to OC SAN specifications. Any changes to these
specifications by the CONSULTANT are subject to review and approval of OC SAN. Electronic files shall be subject to an acceptance period of 30 calendar days during
which OC SAN shall perform appropriate reviews and including CAD Manual compliance. CONSULTANT shall correct any discrepancies or errors detected and reported within the acceptance period at no additional cost to OC SAN. E. The CONSULTANT shall ensure that all plans and specifications prepared, or recommended under this Agreement allow for competitive bidding. The CONSULTANT shall design such plans or specifications so that procurement of services, labor or materials are not available from only one source, and shall not design plans and specifications around a single or specific product, piece of major equipment or machinery, a specific patented design or a proprietary process, unless required by principles of sound engineering practice and
supported by a written justification that has been approved in writing by OC SAN. The CONSULTANT shall submit this written justification to OC SAN prior to beginning work on such plans and specifications. Whenever the CONSULTANT
recommends a specific product or equipment for competitive procurement, such recommendation shall include at least two brand names of products that are capable of meeting the functional requirements applicable to the project.
F. All professional services performed by the CONSULTANT, including but not limited to all drafts, data, correspondence, proposals, reports, and estimates compiled or composed by the CONSULTANT, pursuant to this Agreement, are for the sole use of OC SAN, its agents and employees. Neither the documents nor their contents shall be released to any third party without the prior written consent of OC SAN. This provision does not apply to information that (a) was publicly known, or otherwise known to the CONSULTANT, at the time that it was disclosed to the CONSULTANT by OC SAN, (b) subsequently becomes publicly known to the CONSULTANT other than through disclosure by OC SAN.
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 3 of 19
2. COMPENSATION
Total compensation shall be paid to CONSULTANT for the Services in accordance with the following provisions:
A. Total Compensation Total compensation shall be in an amount not to exceed Three Million Eight Hundred Eighty Thousand Dollars ($3,880,000). Total compensation to CONSULTANT including burdened labor (salaries plus benefits), overhead, profit, direct costs, and Subconsultant(s) fees and costs shall not exceed the sum set forth in Attachment “E” - Fee Proposal. B. Labor As a portion of the total compensation to be paid to CONSULTANT, OC SAN
shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus benefits) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT. Upon request of OC SAN,
CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this project.
C. Overhead As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall compensate CONSULTANT and Subconsultants for overhead at the rate equal to the percentage of burdened labor as specified in Attachment “E” - Fee Proposal. D. Profit Profit for CONSULTANT and Subconsultants shall be a percentage of consulting services fees (Burdened Labor and Overhead). When the consulting or
subconsulting services amount is $250,000 or less, the maximum Profit shall be 10%. Between $250,000 and $2,500,000, the maximum Profit shall be limited by a straight declining percentage between 10% and 5%. For consulting or
subconsulting services fees with a value greater than $2,500,000, the maximum Profit shall be 5%. Addenda shall be governed by the same maximum Profit percentage after adding consulting services fees.
As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this project according to Attachment “E” - Fee Proposal. E. Subconsultants For any Subconsultant whose fees for services are greater than or equal to $100,000 (excluding out-of-pocket costs), CONSULTANT shall pay to Subconsultant total compensation in accordance with the Subconsultant amount
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 4 of 19
specified in Attachment “E” - Fee Proposal.
For any Subconsultant whose fees for services are less than $100,000, CONSULTANT may pay to Subconsultant total compensation on an hourly-rate basis per the attached hourly rate Schedule and as specified in the Scope of
Work. OC SAN shall pay to CONSULTANT the actual costs of Subconsultant fees and charges in an amount not to exceed the sum set forth in Attachment “E” - Fee Proposal. F. Direct Costs OC SAN shall pay to CONSULTANT and Subconsultants the actual costs of permits and associated fees, travel and licenses for an amount not to exceed the sum set forth in Attachment “E” - Fee Proposal. OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN. Upon request, CONSULTANT shall provide to OC SAN
receipts and other documentary records to support CONSULTANT’s request for reimbursement of these amounts, see Attachment “D” - Allowable Direct Costs. All incidental expenses shall be included in overhead pursuant to Section 2 -
COMPENSATION above. G. Other Direct Costs
Other Direct Costs incurred by CONSULTANT and its Contractor due to modifications to the Scope of Work resulting from field investigations and field work required by the Agreement. These items may include special equipment, test equipment and tooling and other materials and services not previously identified. Refer to attachment “D” Allowable Direct Costs for payment information. H. Reimbursable Direct Costs OC SAN will reimburse the CONSULTANT for reasonable travel and business
expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this Agreement. The reimbursement of the above- mentioned expenses will be based on an “accountable plan” as considered by
Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be
found on the U.S. General Service Administration website at http://www.gsa.gov/portal/category/104711#.
The CONSULTANT shall be responsible for the most economical and practical means of management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical.
CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN.
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 5 of 19
Travel and travel arrangements – Any travel involving airfare, overnight stays or
multiple day attendance must be approved by OC SAN in advance. Local Travel is considered travel by the CONSULTANT within OC SAN general
geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial, and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel. Lodging – Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN.
Travel Meals – Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals.
Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this Agreement.
I. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services described in CONSULTANT’s Proposal will exceed seventy-five percent (75%) of the not-to-exceed amount of the Agreement, including approved additional compensation, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately
from, and in addition to any notification requirements contained in the CONSULTANT’s invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed
amount is a material breach of this Agreement. 3. REALLOCATION OF TOTAL COMPENSATION
OC SAN, by its Director of Engineering, shall have the right to approve a reallocation of the incremental amounts constituting the total compensation, provided that the total compensation is not increased. 4. PAYMENT A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period. CONSULTANT shall allocate costs in the same manner as it would for payment requests as described in this Section
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 6 of 19
of the Agreement. CONSULTANT shall warrant and certify the accuracy of these costs and understand that submitted costs are subject to Section 11 - AUDIT
PROVISIONS. B. CONSULTANT may submit monthly or periodic statements requesting payment
for those items included in Section 2 - COMPENSATION hereof in the format as required by OC SAN. Such requests shall be based upon the amount and value of the work and services performed by CONSULTANT under this Agreement and shall be prepared by CONSULTANT and accompanied by such supporting data, including a detailed breakdown of all costs incurred and project element work performed during the period covered by the statement, as may be required by OC SAN. Upon approval of such payment request by OC SAN, payment shall be made to CONSULTANT as soon as practicable of one hundred percent (100%) of the invoiced amount on a per-project-element basis.
If OC SAN determines that the work under this Agreement or any specified project element hereunder, is incomplete and that the amount of payment is in
excess of: i. The amount considered by OC SAN’s Director of Engineering to be adequate
for the protection of OC SAN; or ii. The percentage of the work accomplished for each project element. He may, at his discretion, retain an amount equal to that which ensures that the total amount paid to that date does not exceed the percentage of the completed work for each project element or the project in its entirety. C. CONSULTANT may submit periodic payment requests for each 30-day period of this Agreement for the profit as set forth in Section 2 - COMPENSATION above. Said profit payment request shall be proportionate to the work actually
accomplished to date on a per-project-element basis. In the event OC SAN's Director of Engineering determines that no satisfactory progress has been made since the prior payment, or in the event of a delay in the work progress for any
reason, OC SAN shall have the right to withhold any scheduled proportionate profit payment.
D. Upon satisfactory completion by CONSULTANT of the work called for under the terms of this Agreement, and upon acceptance of such work by OC SAN, CONSULTANT will be paid the unpaid balance of any money due for such work, including any retained percentages relating to this portion of the work. E. Upon satisfactory completion of the work performed hereunder and prior to final payment under this Agreement for such work, or prior settlement upon termination of this Agreement, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 7 of 19
against OC SAN arising under or by virtue of this Agreement other than such claims, if any, as may be specifically exempted by CONSULTANT from the
operation of the release in stated amounts to be set forth therein. F. Pursuant to the California False Claims Act (Government Code Sections 12650-
12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this Agreement may be held liable for treble damages and up to a ten thousand dollars ($10,000) civil penalty for each false claim submitted. This Section shall also be binding on all Subconsultants. A CONSULTANT or Subconsultant shall be deemed to have submitted a false claim when the CONSULTANT or Subconsultant: a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by OC SAN; c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN;
d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or e) is a beneficiary of an inadvertent submission of a false claim to OC SAN, and fails to
disclose the false claim to OC SAN within a reasonable time after discovery of the false claim. 5. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section 1771.4, the work is subject to compliance monitoring and enforcement by the DIR.
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall
submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776.
C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations. D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulation Section 16461(e).
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 8 of 19
6. DOCUMENT OWNERSHIP – SUBSEQUENT CHANGES TO PLANS AND SPECIFICATIONS
A. Ownership of Documents for the Services performed.
All documents, including but not limited to, original plans, studies, sketches,
drawings, computer printouts and disk files, and specifications prepared in connection with or related to the Scope of Work or Services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed. OC SAN ownership entitlement arises upon payment or any partial payment for work performed and includes ownership of any and all work product completed prior to that payment. This Section shall apply whether the CONSULTANT’s Services are terminated: a) by
the completion of the Agreement, or b) in accordance with other provisions of this Agreement. Notwithstanding any other provision of this paragraph or Agreement, the CONSULTANT shall have the right to make copies of all such plans, studies,
sketches, drawings, computer printouts and disk files, and specifications. B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the plans or specifications, where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service rendered by CONSULTANT was not a proximate cause of the damage. 7. INSURANCE A. General i. Insurance shall be issued and underwritten by insurance companies acceptable to OC SAN.
ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State
Compensation Insurance Fund, for the required policy of Workers’ Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent. iii. Coverage shall be in effect prior to the commencement of any work under this Agreement. B. General Liability The CONSULTANT shall maintain during the life of this Agreement, including the
period of warranty, commercial general liability insurance written on an occurrence basis providing the following minimum limits of liability coverage: Two
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 9 of 19
Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000) aggregate. If aggregate limits apply separately to this contract (as evidenced by
submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: premises-operations, blanket contractual liability (for this
Agreement), products liability/completed operations (including any product manufactured or assembled), broad form property damage, blanket contractual liability, independent contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) and Riggers/On Hook Liability must be included in the general liability policy and coverage must be reflected on the submitted certificate of insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance
policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor, or subcontractor performing work or rendering services on behalf of
OC SAN in connection with the planning, development, and construction of the project. In all its insurance coverages related to the work, CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery
by subrogation against OC SAN, its or their officers, agents, or employees, or any other consultant, contractor, or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged. C. Umbrella Excess Liability The minimum limits of general liability and automobile liability insurance required, as set forth herein, shall be provided for through either a single policy of primary
insurance or a combination of policies of primary and umbrella excess coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for
general liability and automobile liability. D. Automobile/Vehicle Liability Insurance The CONSULTANT shall maintain a policy of automobile liability insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: combined single limit of One Million Dollars ($1,000,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement.
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 10 of 19
E. Drone Liability Insurance
If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of one million dollars ($1,000,000) in form acceptable to OC SAN.
F. Workers’ Compensation Insurance The CONSULTANT shall provide such workers’ compensation insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including employer’s liability insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such workers’ compensation insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are
referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones Act claims.
G. Errors and Omissions/Professional Liability
CONSULTANT shall maintain in full force and effect, throughout the term of this Agreement, standard industry form professional negligence errors and omissions insurance coverage in an amount of not less than Two Million Dollars ($2,000,000) with limits in accordance with the provisions of this paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of five (5) years from the date of the completion of the services hereunder. In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of
CONSULTANT during the course of performing services under the term of this Agreement. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the present or
new carrier. In the event the present policy of insurance is written on an “occurrence” basis,
said policy shall be continued in full force and effect during the term of this Agreement or until completion of the services provided for in this Agreement, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts of CONSULTANT during the course of performing services under the term of this Agreement. CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and
the expiration date of said policy, and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term.
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 11 of 19
H. Proof of Coverage
The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be
received and approved by OC SAN before work commences. OC SAN reserves the right to require, at any time, complete, certified copies of all required insurance policies, including endorsements, effecting the coverage required. The following are approved forms that must be submitted as proof of coverage:
• Certificate of Insurance ACORD Form 25 or other equivalent certificate
of insurance form
• Additional Insurance (General Liability)
The combination of (ISO Forms)
CG 20 10 and CG 20 37 All other additional insured endorsements must
be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN.
• Additional Insured (Automobile Liability)
Submit endorsement provided by carrier for OC SAN approval.
• Waiver of Subrogation Submit workers’ compensation waiver of subrogation endorsement provided by carrier for OC SAN approval.
• Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below. I. Cancellation and Policy Change Notice The CONSULTANT is required to notify OC SAN in writing of any insurance
cancellation notice it receives or other knowledge of pending or actual insurance
policy cancellation within two (2) working days of receipt of such notice or
acquisition of such knowledge. Additionally, the CONSULTANT is required to notify OC SAN in writing of any change in the terms of insurance, including
reduction in coverage or increase in deductible/SIR, within two (2) working days
of receipt of such notice or knowledge of same.
Said notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT
10844 Ellis Avenue, Fountain Valley, CA 92708
Attention: Contracts, Purchasing & Materials Management Division
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 12 of 19
J. Primary Insurance The general and automobile liability policies shall contain a Primary and “Non
Contributory” clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT.
K. Separation of Insured The general and automobile liability policies shall contain a “Separation of
Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this Agreement, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property. M. Deductibles and Self-Insured Retentions
Any deductible and/or self-insured retention must be declared to OC SAN on the certificate of insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration
and defense expenses. N. Defense Costs The general and automobile liability policies shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits. O. Subconsultants
The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work. P. Limits Are Minimums
If the CONSULTANT maintains higher limits than any minimums shown above, then OC SAN requires and shall be entitled to coverage for the higher limits maintained by CONSULTANT.
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 13 of 19
8. SCOPE CHANGES
In the event of a change in the Scope of Work, requested by OC SAN, the parties hereto shall execute an amendment to this Agreement setting forth with particularity all terms of the new Agreement, including but not limited to any additional CONSULTANT's fees.
9. PROJECT TEAM AND SUBCONSULTANTS CONSULTANT shall provide to OC SAN, prior to execution of this Agreement, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used on this project by CONSULTANT. CONSULTANT shall include a description of the scope of work to be done by each Subconsultant and each CONSULTANT’s project team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant on a per-project-element basis, broken down as indicated in Section 2 - COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT’s project
team members without prior written approval by OC SAN. 10. ENGINEERING REGISTRATION
The CONSULTANT’s personnel are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered
engineer but represents and agrees that wherever in the performance of this Agreement requires the services of a registered engineer, such services hereunder will be performed under the direct supervision of registered engineers. 11. AUDIT PROVISIONS A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents, and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this Agreement. The CONSULTANT shall include OC SAN’s right as described above, in any and
all of their subcontracts, and shall ensure that these rights are binding upon all Subconsultants.
B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect
costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this Agreement during the term of this Agreement and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 14 of 19
CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified
employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all project related accounting records and documents, and any other financial data.
12. LEGAL RELATIONSHIP BETWEEN PARTIES The legal relationship between the parties hereto is that of an independent contractor and nothing herein shall be deemed to make CONSULTANT an employee of OC SAN. 13. NOTICES All notices hereunder and communications regarding the interpretation of the terms of this Agreement, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return
receipt requested, postage prepaid. Notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT 10844 Ellis Avenue Fountain Valley, CA 92708-7018
Attention: Wai Chan, Contracts Administrator Copy: Victoria Pilko, Project Manager Notices shall be mailed to CONSULTANT at:
STANTEC CONSULTING SERVICES, INC. 300 North Lake Avenue, Suite 400 Pasadena, CA 91101 Attention: Venu Kolli, Senior Principal Area Manager All communication regarding the Scope of Work, will be addressed to the Project Manager. Direction from other OC SAN’s staff must be approved in writing by OC SAN’s Project Manager prior to action from the CONSULTANT. 14. TERMINATION
OC SAN may terminate this Agreement at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination,
CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination. CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this Agreement, when the same are due.
Notice of termination shall be mailed to OC SAN and/or CONSULTANT in accordance with Section 13 - NOTICES.
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 15 of 19
15. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, computation and study materials in its
files pertaining to the work described in this Agreement, which is requested in writing by OC SAN. 16. COMPLIANCE A. Labor CONSULTANT certifies by the execution of this Agreement that it pays employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all federal, state and local directives
and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment.
B. Air Pollution
CONSULTANT and its subconsultants and subcontractors shall comply with all applicable federal, state and local air pollution control laws and regulations. C. Iran Contracting Act CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208). 17. AGREEMENT EXECUTION AUTHORIZATION Both OC SAN and CONSULTANT do covenant that each individual executing this
document by and on behalf of each party is a person duly authorized to execute agreements for that party. 18. DISPUTE RESOLUTION In the event of a dispute arising between the parties regarding performance or
interpretation of this Agreement, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services. 19. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which it may be entitled.
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 16 of 19
20. PROGRESS REPORTS
Monthly progress reports shall be submitted for review by the tenth day of the following month and must include as a minimum: 1) current activities, 2) future activities, 3) potential items that are not included in the Scope of Work, 4) concerns and possible
delays, 5) percentage of completion, and 6) budget status. 21. WARRANTY CONSULTANT shall perform its services in accordance with generally accepted industry and professional standards. If, within the 12-month period following completion of its services, OC SAN informs CONSULTANT that any part of the services fails to meet those standards, CONSULTANT shall, within the time prescribed by OC SAN, take all such actions as are necessary to correct or complete the noted deficiency(ies). 22. INDEMNIFICATION
To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN,
which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, consultants, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities,
causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and OC SAN’s general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in carrying out its obligations under this Agreement to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, CONSULTANT, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding
the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from:
(A) the active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or
(C) the independent action of a third party who is neither one of the Indemnified Parties nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them. Exceptions (A) through (B) above shall not apply, and CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder.
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 17 of 19
CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the
provisions of this Agreement. Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this Agreement are
contractual and the result of negotiation between the parties hereto. Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting party, shall not be employed in the interpretation of this Agreement. 23. DUTY TO DEFEND The duty to defend hereunder is wholly independent of and separate from the duty to indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code Section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without
regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the
payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution
expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims. CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this Agreement until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 24. CONSULTANT PERFORMANCE
The CONSULTANT’s performance shall be evaluated by OC SAN. A copy of the evaluation shall be sent to the CONSULTANT for comment. The evaluation, together
with the comments, shall be retained by OC SAN and may be considered in future CONSULTANT selection processes. 25. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES CONSULTANT shall comply with all OC SAN policies and procedures including the Contractor Safety Standards, as applicable, all of which may be amended from time to time. 26. CLOSEOUT When OC SAN determines that all work authorized under the Agreement is fully complete and that OC SAN requires no further work from CONSULTANT, or the Agreement is otherwise terminated or expires in accordance with the terms of the
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 18 of 19
Agreement, OC SAN shall give the Consultant written notice that the Agreement will be closed out. CONSULTANT shall submit all outstanding billings, work submittals,
deliverables, reports or similarly related documents as required under the Agreement within thirty (30) days of receipt of notice of Agreement closeout.
Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the Agreement and will either: i. Give the CONSULTANT a final Agreement Acceptance: or ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in this Agreement. Such support must be provided within the timeframe requested by OC SAN.
Notwithstanding the final Agreement Acceptance the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to
complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise); and the CONSULTANT shall remain obligated under all those provisions of
the Agreement which expressly or by their nature extend beyond and survive final Agreement Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final Agreement Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or agreement with, the CONSULTANT’s request for final Agreement Acceptance. 27. ENTIRE AGREEMENT This Agreement constitutes the entire understanding and agreement between the
Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof.
[THIS SECTION INTENTIONALLY LEFT BLANK]
PDSA PROJECT NO. 1-23
Revised 110221 SANTA ANA TRUNK SEWER REHABILITATION
Page 19 of 19
IN WITNESS WHEREOF, this Agreement has been executed in the name of OC SAN and CONSULTANT by their respective duly authorized officers as of the day and year first written
above.
STANTEC CONSULTING SERVICES INC.
By _______________________________ _________________ Date
__________________________________________________ Printed Name & Title
ORANGE COUNTY SANITATION DISTRICT
By _______________________________ _________________ John B. Withers Date
Board Chairman By _______________________________ _________________ Kelly A. Lore Date Clerk of the Board By _______________________________ _________________ Ruth Zintzun Date Purchasing & Contracts Manager
Attachments: Attachment “A” – Scope of Work
Attachment “B” – Labor Hour Matrix Attachment “C” – Not Attached Attachment “D” – Allowable Direct Costs Attachment “E” – Fee Proposal Attachment “F” – Not Used Attachment “G” – Not Attached Attachment “H” – Not Used Attachment “I” – Cost Matrix and Summary Attachment “J” – Not Attached Attachment “K” – Minor Subconsultant Hourly Rate Schedule Attachment “L” – Contractor Safety Standards Attachment “M” – Iran Contracting Act Verification WC:MS
ATTACHMENT “A”
SCOPE OF WORK
02-11-2022 Project No. 1-23 – Design SOW Page 1 of 52
SANTA ANA TRUNK SEWER REHABILITATION, PROJECT NO. 1-23
PROFESSIONAL DESIGN SERVICES AGREEMENT ATTACHMENT A - SCOPE OF WORK
02-11-2022 Project No. 1-23 – Design SOW Page 2 of 52
TABLE OF CONTENTS
1. PROJECT REQUIREMENTS ................................................................................................................ 5
SUMMARY...................................................................................................................... 5 1.0.1 Professional Design Engineering Services ............................................................ 5
1.0.2 Professional Licensing requirements ..................................................................... 5 BACKGROUND .............................................................................................................. 5 GENERAL PROJECT DESCRIPTION ....................................................................... 5
PROJECT EXECUTION PHASES............................................................................... 6 DESCRIPTION OF PROJECT ELEMENTS .............................................................. 6 1.4.1 Project Element 1 – Rehabilitation of the Santa Ana Trunk Sewer ...................... 6 1.4.2 Project Element 2 – Air Jumpers ........................................................................... 6 1.4.3 Project Element 3 – Rehabilitation of Santa Ana Trunk Manholes ...................... 7 1.4.4 Project Element 4 – Manhole Improvements ........................................................ 8 1.4.5 Temporary Facilities During Construction ............................................................ 9 1.4.6 Coordination with Other Projects ........................................................................ 10 DESIGN CONSIDERATIONS .................................................................................... 10 1.5.1 Technology and configuration choices ................................................................ 10 1.5.2 Design Decisions ................................................................................................. 11 1.5.3 Design Selection Criteria..................................................................................... 11 1.5.4 Project Element Description Revisions ............................................................... 11 1.5.5 Cost Model .......................................................................................................... 11
PROJECT SCHEDULE ............................................................................................... 11 1.6.1 General ................................................................................................................ 11
2. PHASE 2 – PRELIMINARY DESIGN .................................................................................................. 13
Preliminary Design Execution ...................................................................................... 13 2.0.1 Preliminary Design Decision Plan (PDDP) ......................................................... 13 Predesign Evalution Studies (NOT USED) ................................................................. 13 Preliminary Design Production .................................................................................... 13 2.2.1 General ................................................................................................................ 13 2.2.2 Design Memos ..................................................................................................... 13 2.2.3 Preliminary Design Drawings ............................................................................. 16 2.2.4 Preliminary Design Report (PDR) Production, Contents and Organization ....... 16
2.2.5 Preliminary Design Cost Estimate ...................................................................... 17 Preliminary Design Activities ....................................................................................... 17 2.3.1 Easements, Property Boundaries and Work Area Limits .................................... 17
2.3.2 Topographic Survey ............................................................................................ 18 2.3.3 Geotechnical Investigation .................................................................................. 19 2.3.4 Utility Investigation ............................................................................................. 20
2.3.5 Public Relations ................................................................................................... 25 2.3.6 Specialty Service ................................................................................................. 27 2.3.7 Value Engineering Assistance (Not used) ........................................................... 28 2.3.8 Environmental Documentation ............................................................................ 28 2.3.9 Permitting Assistance .......................................................................................... 28 2.3.10 Project Management ............................................................................................ 30 2.3.11 Risk Management ................................................................................................ 31 2.3.12 Quality Control .................................................................................................... 31 PDR Workshops and Meetings .................................................................................... 31 2.4.1 General ................................................................................................................ 31
1.0
1.1
1.2
1.3
1.4
1.5
1.6
2.0
2.1
2.2
2.3
2.4
02-11-2022 Project No. 1-23 – Design SOW Page 3 of 52
2.4.2 PDR Production Workshops ............................................................................... 31 2.4.3 PDR Review Workshops ..................................................................................... 32
2.4.4 PDR Constructability Workshop ......................................................................... 32 2.4.5 Technical Progress Meetings............................................................................... 33 2.4.6 Focused Meetings ................................................................................................ 33 2.4.7 Coordination with Other Projects Meetings ........................................................ 34 2.4.8 Stormwater Compliance Meeting ........................................................................ 34
3. PHASE 3 – DESIGN ............................................................................................................................ 34
Bid Documents ............................................................................................................... 34 3.0.1 General ................................................................................................................ 34 3.0.2 Engineering Design Guideline Updates .............................................................. 34 3.0.3 General Requirements and Additional General Requirements ............................ 35 3.0.4 Design submittals ................................................................................................ 35
3.0.5 Construction Submittal Items List ....................................................................... 36 3.0.6 Temporary Facilities During Contruction ........................................................... 36 Design Support Documentation ................................................................................... 36 3.1.1 Design Submittal Support Documentation .......................................................... 36 3.1.2 Construction Cost Estimate ................................................................................. 37 3.1.3 Construction Schedule ......................................................................................... 37 3.1.4 Procurement Alternatives .................................................................................... 37 Design Activities ............................................................................................................ 37 3.2.1 Easements, Property Boundaries and Work Area Limits .................................... 38 3.2.2 Topographic Survey ............................................................................................ 38 3.2.3 Utility Investigation ............................................................................................. 38
3.2.4 Noise Evaluation Services ................................................................................... 38 3.2.5 Traffic Control Services ...................................................................................... 39 3.2.6 Public Relations ................................................................................................... 39
3.2.7 Specialty Service ................................................................................................. 39 3.2.8 Environmental Documentation ............................................................................ 39 3.2.9 Permitting assistance ........................................................................................... 39
3.2.10 Project Management ............................................................................................ 39 3.2.11 Risk Management ................................................................................................ 39 3.2.12 Quality Control .................................................................................................... 40
Design Workshops and Meetings ................................................................................. 40 3.3.1 General ................................................................................................................ 40 3.3.2 Design Phase Workshops .................................................................................... 40 3.3.3 Pre-DS2 Constructability Workshop ................................................................... 40 3.3.4 Design Phase Meetings ....................................................................................... 42 3.3.5 Consultant Office Technical Meetings (COTMs) ............................................... 43 3.3.6 Coordination with Other Projects Meetings ........................................................ 43 3.3.7 Safety and Risk Meeting ..................................................................................... 44 3.3.8 Construction Submittal Items List Meeting ........................................................ 44 3.3.9 Stormwater Compliance Meeting ........................................................................ 44 Bid Phase Support Services .......................................................................................... 44
3.4.1 Bid Phase Support Services ................................................................................. 44 3.4.2 Bid Evaluation Assistance ................................................................................... 44 3.4.3 Conformed Document Preparation ...................................................................... 46
4. PHASE 4 – CONSTRUCTION AND INSTALLATION SERVICES ..................................................... 46
5. PHASE 5 – COMMISSIONING SERVICES ........................................................................................ 46
3.0
3. 1
3.2
3.3
3.4
02-11-2022 Project No. 1-23 – Design SOW Page 4 of 52
6. PHASE 6 – CLOSE OUT .................................................................................................................... 46
7. GENERAL REQUIREMENTS ............................................................................................................. 46
GENERAL ..................................................................................................................... 46 7.0.1 OC SAN Engineering Design Guidelines and Strategic Plan ............................. 46 7.0.2 Project Phases and Tasks ..................................................................................... 47 7.0.3 Construction Sequencing and Constraints ........................................................... 47 7.0.4 Standard Drawings and Typical Details .............................................................. 47 7.0.5 Software .............................................................................................................. 47 7.0.6 Submittal Review using Bluebeam ..................................................................... 48 7.0.7 Word Track Changes ........................................................................................... 48 7.0.8 GIS Submittals .................................................................................................... 48
8. PROJECT-SPECIFIC DEVIATIONS FROM OC SAN DESIGN GUIDELINES (NOT USED) ............ 50
9. STAFF ASSISTANCE ......................................................................................................................... 50
10. EXHIBITS ............................................................................................................................................ 50
7.0
02-11-2022 Project No. 1-23 – Design SOW Page 5 of 52
1. PROJECT REQUIREMENTS
SUMMARY
1.0.1 PROFESSIONAL DESIGN ENGINEERING SERVICES
A. Provide professional design engineering services for the project described herein including the following:
1. Preliminary Design Report
2. Environmental documentation services
3. Permitting assistance
4. Preparation of bid documents
1.0.2 PROFESSIONAL LICENSING REQUIREMENTS
All plans and specifications shall be prepared by a professional engineer licensed in the State of California of the associated discipline.
BACKGROUND
The Santa Ana Trunk from Bristol Street to Plant No. 1 were originally constructed in the 1950s under Project No. 1-1. Some alignment modifications have been made over the years, including a realignment of the I-405 crossing in 1966 under Project No.1-1A, addition of a diversion structure at Raitt Street and Alton Avenue in 1976 under Project No. 1-14, rehabilitation of manholes in 1987 under Project 1-15R and a realignment of the Santa Ana River crossing in 1993 under Project No.1-16 (included with Project No.14-1-1A-2). Most recently, Project No.1-17 was completed in 2016 which rehabilitated seventeen (17) manholes,
1,000 LF of pipeline, and four (4) siphon structures. Project No.1-17 also added a new diversion structure to the Santa Ana Trunk along with a new junction structure to the Sunflower Trunk near Sunflower Avenue/Cadillac Avenue.
The majority of the Santa Ana Trunk between Bristol Street and Plant No. 1 consists of 42-inch and 48-inch RCP with a 60-inch RCP segment under Interstate 405; there are also two (2) 48-
inch RCP siphons and one (1) triple-barrel 15/24/27-inch VCP siphon. Other than the river, flood channel, and freeway crossings, the Santa Ana Trunk has significant reaches within easement areas as well as segments that both cross and parallel Union Pacific Railroad
(UPRR) right of way. Most concrete manhole structures are lined with either PVC or polyurethane but some liners require rehabilitation. Corrosion assessment reports date back to 2001, most recently performed in 2020. Pipeline CCTV inspections date back to 2001 for some segments, with most recent pipeline and manhole CCTV inspections being completed in 2021. The most recent corrosion assessment and CCTV show exposed aggregate and exposed rebar and infiltration in some pipelines. Some manhole structures showed exposed aggregate as well as liner detachment. Inspection and CCTV reports are included in Exhibit 19.
GENERAL PROJECT DESCRIPTION
This project will rehabilitate the Santa Ana Trunk Sewer north of Interstate 405. This includes
rehabilitation of pipelines (lining) and manholes. The project includes rehabilitation of
1.0
1.1
1.2
02-11-2022 Project No. 1-23 – Design SOW Page 6 of 52
approximately 15,000 feet of large diameter sewers along Alton Avenue and easements crossing MacArthur Boulevard, Harbor Boulevard, Scenic Avenue, Hyland Avenue and
Sunflower Avenue in the Cities of Santa Ana and Costa Mesa.
PROJECT EXECUTION PHASES
All OC SAN projects are divided into six phases. CONSULTANT shall provide engineering services for all Project Elements listed in this Scope of Work for the following Phases:
Phase 1 – Project Development (Not in this Scope of Work)
Phase 2 – Preliminary Design
Phase 3 – Design
Phase 4 – Construction (Not in this Scope of Work)
Phase 5 – Commissioning (Not in this Scope of Work)
Phase 6 – Close Out (Not in this Scope of Work)
DESCRIPTION OF PROJECT ELEMENTS
Detailed descriptions of the Project Elements are presented below.
1.4.1 PROJECT ELEMENT 1 – REHABILITATION OF THE SANTA ANA TRUNK SEWER
A. Cured in place pipe (CIPP) approximately 8,700 LF of 48-inch RCP
B. CIPP approximately 5,600 LF of 42-inch RCP
C. CIPP approximately 300 LF of 15-inch to 27-inch VCP
D. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the CONSULTANT shall make the following assumptions regarding this project element:
a. Bypass is required for 30 lining segments. Detailed bypass plans showing the work area for temporary pumping and the routing of the bypass line(s) are required at each location. Upstream bypass of all laterals connecting to manholes is required and shall be shown on the bypass plans.
b. Hydraulic modeling is required to determine the bypass flow and recommended diversion settings for each bypass. Hydraulic modeling will be required to determine maximum acceptable liner thicknesses of each segment of pipeline.
1.4.2 PROJECT ELEMENT 2 – AIR JUMPERS
A. Install an air jumper at the two siphon locations shown in Figure 1.
B. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the CONSULTANT shall make the following assumptions regarding this project element:
a. The location of the air jumpers shall be determined in preliminary design.
b. A permit from Orange County Flood District is required for each air jumper.
1.3
1.4
02-11-2022 Project No. 1-23 – Design SOW Page 7 of 52
c. Air Jumper at location 1 is buried above the storm channel.
d. Air Jumper at location 2 requires a support structure to cross the channel.
e. Air Jumper at location 2 requires permits from the railroad as described in Section 2.3.9.
Figure 1
1.4.3 PROJECT ELEMENT 3 – REHABILITATION OF SANTA ANA TRUNK MANHOLES
Complete rehabilitation of the seven manholes not rehabilitated in Project No. 1-17. Demolition of one manhole per current OC SAN standards, see Figure 2. Partial rehabilitation of the remaining twenty-four manholes.
ocrco D-3
22.5'
Air Jumper-
Location 1
157+00 158+00
s , Air Jumper-
Location 2
02-11-2022 Project No. 1-23 – Design SOW Page 8 of 52
Figure 2
A. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the CONSULTANT shall make the following assumptions regarding this project element:
a. Review CCTV of all thirty-two manholes to determine the recommended rehabilitation/abandonment at each manhole.
b. Evaluate rehabilitation technologies, including but not limited to spray-on
polyurethane liners, cured in place manhole liners and polymer concrete inserts. Evaluate the life cycle cost and advantages/disadvantages of each technology.
c. Provide rehabilitation recommendation for each manhole. The
recommendation shall consider all repairs, including concrete repairs, coating of the entire structure, coating of portions of the structure, plastic liner repairs, structural rehabilitation, diversion repairs, and replacement of components such
as the cone/flat top, chimney, frame and cover.
d. Develop a matrix, including the cost estimate, summarizing the recommended rehabilitation at each manhole. Develop details for all recommendations. The matrix shall be provided with the Draft and Final PDR.
1.4.4 PROJECT ELEMENT 4 – MANHOLE IMPROVEMENTS
A. Improve access to three manholes at the railroad easement by installing a 12-foot square concrete pad per Figure 3.
02-11-2022 Project No. 1-23 – Design SOW Page 9 of 52
Figure 3
B. Replace cast iron frame and covers with composites on each side of the two
siphons.
C. Provide diversion slots in manhole SAN0190-0000 (upstream of triple barrel siphon) to facilitate isolation for tire cleaning. Modify the structure to provide 36-inch composite
frame and cover access points to accommodate diversion board installation and line cleaning.
D. Add an additional manhole between STA 61+62.49 and STA 75+90.92 to facilitate
lining and future cleaning.
E. Assumptions for Level of Effort
1. For the purpose of estimating the predesign and design phase levels of effort, the CONSULTANT shall make the following assumptions regarding this project element:
a. The exact location of the new manhole shall be determined based on the construction implementation plan.
b. The manholes in Figure 3 are next to an abandoned railroad track. OC SAN will assist with access to the site for field investigation and survey.
1.4.5 TEMPORARY FACILITIES DURING CONSTRUCTION
A. In certain cases, construction sequencing constraints may require the contractor to
construct a temporary facility to be used during a certain portion of the construction period. CONSULTANT shall identify in what instances such facilities are required or reasonably warranted and present those instances with implementation plans and construction sequencing constraints to OC SAN for consideration. When such facilities are found to be either required or reasonably warranted, CONSULTANT shall provide sufficiently detailed drawings and specifications to be included in the Bid Documents that bidders understand what is required to provide and potentially operate the temporary facilities and that the reliability and performance of the facilities will meet OC SAN’s needs and reasonably mitigate construction risks. Examples of potential facilities include:
1. Bypass Pumping and temporary bypass piping.
2. Temporary odor control facilities.
3. Temporary noise abatement.
02-11-2022 Project No. 1-23 – Design SOW Page 10 of 52
B. CONSULTANT shall include design measures for the temporary handling of flows to be implemented by the Contractor during construction considering OC SAN’s goal of
zero sewage spills.
C. If existing facilities such as valves, gates, stop logs, etc. are being used for diversions, include a plan for testing those facilities during Phase 3 – Design, to verify
that they will function adequately for the purpose. If testing cannot be performed, CONSULTANT shall identify the risks associated with using the facility for bypassing, along with contingency plans and mitigation measures to be implemented if they are found not function adequately during construction.
1.4.6 COORDINATION WITH OTHER PROJECTS
A. The following projects may impact or require coordination with this project:
1. 1-24, Greenville Trunk Improvements. This project will upsize the Greenville Trunk sewer to increase capacity. This will include installation of pipelines,
replacement of manholes and rehabilitation of manholes. The project includes improvements of up to 16,000 feet of sewer along Sullivan Street, Edinger Ave, and Greenville Street in the City of Santa Ana. The project will connect to the
Santa Ana Trunk on Alton Avenue and Greenville Street. This project is currently scheduled to start design in 2024.
2. FE19-04, Sunflower Pump Replacement at Plant No. 1. This project will replace the sunflower pumps at Plant No. 1. All diversions to the Sunflower Trunk shall be coordinated with FE19-04 to ensure adequate pumping capacity for diversion. Construction is currently scheduled to start late 2021 and be completed in 2024.
3. P1-105, Headworks Rehabilitation at Plant 1. This project will replace the headworks at plant No. 1 and includes bypass pumping around the metering and diversion structure where the Santa Ana Trunk and other trunks enter Plant No. 1. Construction activities, including diversions shall be coordinated. This project is currently in construction, construction is scheduled to be completed in 2028.
4. One Metro West. The proposed mixed-use One Metro West Project consists of the development of 15.23 acres located at 1683 Sunflower Avenue which
includes: residential with up to 1,057 rental dwelling units, 6,000 square feet of specialty retail, 25,000 square feet of creative office, and recreational uses. The One Metro West Phased Project Construction Analysis dated February 2, 2021,
identifies construction from 2022-2027.
DESIGN CONSIDERATIONS
The following design considerations shall be carried from Preliminary Design through Final Design.
1.5.1 TECHNOLOGY AND CONFIGURATION CHOICES
The project elements in this facility shall be achieved using proven technologies. Alternative means of accomplishing the project elements must be reviewed and accepted by OC SAN prior
to detailed evaluation. All alternative technologies proposed should be currently operating in other collections facilities of similar capacity.
1.5
02-11-2022 Project No. 1-23 – Design SOW Page 11 of 52
1.5.2 DESIGN DECISIONS
Design decisions shall be agreed upon by OC SAN prior to any work being performed by the
CONSULTANT in preliminary and detailed design. All design decisions shall be documented.
1.5.3 DESIGN SELECTION CRITERIA
A. Design selection shall consider construction, lifecycle, operation, and maintenance
costs as well as overall quality. When design recommendations are presented to OC SAN, the design selection criteria shall be clearly identified with the recommendation.
B. The cost estimate shall consist of a 20-year life cycle cost analysis for the options proposed, including costs for engineering, construction, start-up, and operational and maintenance, and future rehabilitation and replacement.
C. The construction cost estimate shall be as described in Engineering Design Guidelines Section 01.4.6 included as Exhibit 17 - OC SAN Engineering Design Guidelines and Standards – Available online at https://www.ocsd.com/about-us/transparency/document-central/-folder-917. Life cycle cost analysis is described in Section 01.2.19 of the Guidelines.
1.5.4 PROJECT ELEMENT DESCRIPTION REVISIONS
CONSULTANT shall review and revise the Project Element Descriptions using track changes at the end of Preliminary Design and at each design submittal. Changes shall be submitted to OC SAN for review.
1.5.5 COST MODEL
A. CONSULTANT shall prepare the cost model to be used to demonstrate the true cost of major project decisions. With each major project decision, the CONSULTANT
shall review and update the cost model. The cost model shall be a living document between the CONSULTANT and OC San to ensure that all changes are being acknowledged in the overall project cost.
B. The cost model shall show the implications of the decisions on the life cycle costs and shall be used in the decision-making process. After decisions are made, the updated construction costs, and life cycle costs, shall be submitted for project records.
C. The cost model shall be used to track project changes through final design.
D. The construction cost estimate shall be as described in Engineering Design Guidelines Section 01.4.6 included as Exhibit 17 - OC SAN Engineering Design Guidelines and Standards – Available online at https://www.ocsd.com/about-us/transparency/document-central/-folder-917.
PROJECT SCHEDULE
1.6.1 GENERAL
A. The table below lists the time frames associated with each major project deliverable and with OC San’s review and approval of those deliverables. CONSULTANT shall
comply with the deadlines indicated in that table.
B. OC SAN’s Project Manager will issue a Notice to Proceed (NTP) that will authorize CONSULTANT to begin preparation of the Project Management Plan (PMP) as defined
in Exhibit 3 – Project Management Requirements.
1.6
02-11-2022 Project No. 1-23 – Design SOW Page 12 of 52
C. OC SAN’s Project Manager will issue a Final Design NTP upon OC SAN’s acceptance of the final Preliminary Design Report.
D. The time frames specified below are used to estimate the actual milestone dates based on the assumed NTP date, as shown in Exhibit 8 - Project Schedule Calculation.
E. OC SAN will consider an alternative CONSULTANT-proposed schedule provided it is consistent with OC SAN resources and schedule constraints and adds value to OC SAN.
PROJECT MILESTONE AND DEADLINES
MILESTONE DEADLINE
NTP
Submit Project Management Plan (PMP) 10 workdays from NTP.
OC San Review of PMP 5 working days from receipt of PMP. CONSULTANT shall issue a revised PMP within 5 working days of receipt of OC San’s
comments for OC San approval.
Kickoff Meeting The kickoff meeting will be scheduled to coincide with the NTP.
Preliminary Design NTP
Submit draft Preliminary Design Report (PDR) 201 workdays from the NTP. CONSULTANT shall establish a schedule with the OC SAN PM for separately submitting working drafts of each Design Memo for OC SAN review prior to completing the draft PDR. This schedule shall factor in the
logical sequence for completing the memos as well as both CONSULTANT and OC SAN resources.
OC SAN Review of draft PDR 20 workdays from receipt of Draft PDR
Submit final Preliminary Design Report 40 workdays from receipt of OC SAN comments on Draft PDR.
Final Design NTP CONSULTANT’s schedule shall allow 10 working days from submittal of the final PDR to receipt of the Design Phase NTP.
Submit Design Submittal
1 (DS1)
119 workdays from Design Phase NTP.
OC SAN Review of DS1 20 workdays from receipt of DS1
Submit Design Submittal 2 (DS2) 90 workdays from receipt of OC SAN comments on DS1.
OC SAN Review of DS2 20 workdays from receipt of DS2
Submit Design Submittal 3 (DS3) 87 workdays from receipt of OC SAN comments on DS2.
OC SAN Review of DS3 20 workdays from receipt of DS3
Submit Final Design Submittal (FDS) 22 workdays from receipt of OC SAN comments on DS3. CONSULTANT shall stop work upon submission of DS3, except as required to participate in OC SAN meetings, until receipt of
OC SAN comments on DS3.
OC SAN Review of FDS 20 workdays from receipt of FDS
02-11-2022 Project No. 1-23 – Design SOW Page 13 of 52
PROJECT MILESTONE AND DEADLINES
MILESTONE DEADLINE
Final Technical Specifications and Plans 21 workdays from receipt of OC SAN comments on FDS.
2. PHASE 2 – PRELIMINARY DESIGN
The preliminary design phase will define the project. The final deliverable of this phase will be
a Preliminary Design Report (PDR) with the basis of design for all elements of the project.
PRELIMINARY DESIGN EXECUTION
2.0.1 PRELIMINARY DESIGN DECISION PLAN (PDDP)
A. CONSULTANT shall prepare a Preliminary Design Decision Plan (PDDP) for how the preliminary design decisions will be properly planned and scheduled such that:
1. The work is planned to meet the specified schedule while providing appropriate opportunities for OC SAN input.
2. OC SAN input is planned with appropriate timing to ensure a high-quality final product.
3. Major decisions are made in a timely manner by the project team and project
stakeholders and do not impact the project schedule.
4. Workshops and meetings are scheduled at the start of the project to ensure maximum participation.
B. The PDDP shall include, at a minimum the following information:
1. Discussion of how major decisions will be made on the project (utilizing a decision tree as appropriate), and the process to gain OC SAN concurrence.
2. Summary and timing of major decisions to fit the project schedule.
3. List of workshops, technical design meetings and focused meetings where major decisions will be made, date of workshop or meeting, and the list of required attendees.
4. Schedule for all workshops, technical design meetings, and focus meetings and list of anticipated attendees.
C. The PDDP shall be developed by the CONSULTANT and submitted for OC SAN review. CONSULTANT shall make the appropriate revisions and submit the final version for use as the basis for execution.
PREDESIGN EVALUTION STUDIES (NOT USED)
PRELIMINARY DESIGN PRODUCTION
2.2.1 GENERAL
A. Preliminary Design Report (PDR) production involves the preparation of design memos, drawings, calculations, and other supporting material resulting in the PDR.
2.2.2 DESIGN MEMOS
2.0
2.1
2.2
02-11-2022 Project No. 1-23 – Design SOW Page 14 of 52
A. The CONSULTANT shall produce Design Memos as indicated below in accordance with Exhibit 1 - Preliminary Design Report Requirements. The CONSULTANT shall
discuss the combining of design memos with OC SAN and develop a design memo submittal list.
☐Process Design Configuration
☐Design Configuration
☐Redundancy
☐Monitoring and Sampling
☐Process Flow Diagrams
☐Operating Philosophies
☐Site and Facility Layouts
☐Preliminary Load Criticality Ranking Table.
☐Hydraulic Analysis
☐Hydraulic Analysis
☐Hydraulic Profile
☐Demolition
☐Describe Demolition Requirements
☐Demolition List
☐Demolition Plans
☐Demo EID
☐Rehabilitation Requirements
☒Geotechnical Data Report
☒Review of Existing Data - Preliminary Geotechnical Report
☒Geotechnical Data Report and Recommendations
☐Civil Design Parameters
☐General Civil
☐Drainage Requirements
☐Corrosion Protection Requirements
☐Utility Requirements
☐Structural Design Parameters
☐Architectural Design Parameters
Note: Develop up to three alternative concepts for review and acceptance
☐Process Mechanical Design Parameters
☐Building Mechanical Design Parameters
☐Fire Protection
☐Fire Protection Requirements
☐Fire Water Flow Analysis
☐Fire Protection Requirements for Existing Facilities
☐Electrical
☐Codes/standards. Brief description of electrical system. Electrical drawings.
☐Identify Electrical System Impacts
☐Report – Data Collection and Verification
☒Preliminary Load List
☐Preliminary Standby Power Requirements
☐ETAP – Preliminary Short Circuit Analysis and Load Flow/Voltage Drop Studies
02-11-2022 Project No. 1-23 – Design SOW Page 15 of 52
☐ETAP – Provide Data. OC SAN will perform ETAP studies.
☐Preliminary Analysis for cable pull calcs, ductbank cable derating, cable tray fill
calcs.
☐Hazardous Area Classification Requirements
☐Instrumentation and Control
☐Instrumentation and Control System
☐Specialty Safety Systems
☐Preliminary SAT
☐PLC and RIO Panel Location Map
☐CCTV Coverage Map
☐Landscaping
☐Landscaping Requirements
☐Develop up to [three] alternative concepts for review and acceptance
☐Plant Utility Investigation Findings
☐Vibration Analysis
☒Collections Basis of Design
☒Codes and Standards
☒Hydraulic Analysis
☒Pipeline Basis of Design
☒Manhole Basis of Design
☒Hydraulic Profiles
☒Collections Rehabilitation Alternatives
☒Pipeline Rehabilitation
☒Manhole Rehabilitation
☐Collections Pipeline Design
Assume 3 viable alignment options
☐Design Memo Items 1-12
☐Open cut vs. Trenchless Technologies
☐Trenchless Technologies at Major Closings
☒Collections Utility Investigation Findings
☒Collections Conceptual Traffic Control
☒AHJ and Traffic Control Identification
☒Basis for Traffic Control Strategy
☒Traffic Analysis
☒Traffic Control Plans
☒Design Safety Requirements
☒Design Safety Requirements
☒Identify all potential project specific safety issues
☒Identify all potential Cal OSHA and OC SAN safety issues
☒Identify construction safety hazards
☒Use Sample Full Project Safety Review Plan to verify safety elements
☒Risk Management Check List to verify safety elements
☐HAZOP
☒Public Impacts
02-11-2022 Project No. 1-23 – Design SOW Page 16 of 52
☐Environmental and Regulatory Requirements (OC SAN will file a Notice of Exemption)
☐CEQA Part of Programmatic EIR
☐CEQA work consists of
☐Determine project environmental and regulatory requirements
☐Matrix of CEQA and Permit Requirements
☐Mitigation, Monitoring and Reporting List
☒Permit Requirements
☒List of Permits Required
☐Oil Well Abandonment
☒Stormwater Requirements
☐Hazardous Material Survey, Mitigation and Control
☐Maintainability
☐Define Maintainability Requirements
☐Maintainability Requirements Plan Drawings
☐Define Maintainability Rules
☐Define Maintainability Information for Project Specific Equipment
☐Facility Operation and Maintenance
☐Facility O&M Requirements
☐Operating Philosophies
☐Preliminary Assessment of O&M Staffing Requirements
☒Implementation Plan
☒Identification of Adjacent Projects
☐Preliminary Commissioning Checklist
☒Preliminary Construction Sequencing Plan
☒Review of Constructability Issues
☒Temporary Handling of Flow
☒Construction Odor Monitoring and Mitigation
☒Preliminary Technical Specification List
2.2.3 PRELIMINARY DESIGN DRAWINGS
A. The CONSULTANT shall produce the following Preliminary Design Report drawings
in accordance with Exhibit 1 - Preliminary Design Report Requirements.
☒General
☐Demolition
☒Civil
☐Landscape
☐Structural
☐Architectural
☐Mechanical
☐Electrical
☐Instrumentation and Control
2.2.4 PRELIMINARY DESIGN REPORT (PDR) PRODUCTION, CONTENTS AND ORGANIZATION
02-11-2022 Project No. 1-23 – Design SOW Page 17 of 52
A. Preliminary Design Report (PDR) Production involves the preparation of design memos, drawings, calculations, and other supporting material resulting in the PDR.
B. The CONSULTANT shall combine the materials described below into a draft PDR. The PDR shall be structured as outlined below, with the contents corresponding to the tasks listed in this Scope of Work.
Volume 1 – Preliminary Design Report Technical Memos Executive Summary Design Memos Design Memo 1, 2, 3, etc. List of Proposed Specification Sections Volume 2 – Drawings (see Exhibit 1, Preliminary Design Drawings) Volume 3 – Submittal Documentation Calculations Equipment Data & Catalog Cuts Project Logs Meeting Minutes
C. The Executive Summary shall summarize the conclusions of the Memos included in the report, and specifically include a summary construction schedule and construction cost estimate.
D. The draft PDR and final PDR shall be submitted in searchable PDF format legible on-screen and as a hard copy. The number of hard copies is indicated in Exhibit 9 - Deliverables Quantities. The labeling and organization of the PDF submittal shall be
in accordance with Exhibit 14 - Bluebeam Designer Training for Submission.
E. Each design memo shall be a separate file.
F. The OC SAN Project Manager may request that the CONSULTANT submit an
electronic proof set of the Draft PDR and Final PDR prior to hard copy production in order to initially confirm that the submittal is ready for printing.
2.2.5 PRELIMINARY DESIGN COST ESTIMATE
A. The CONSULTANT shall provide a cost estimate for the associated PDR submittal indicated below in accordance with Exhibit 1 - Preliminary Design Report Requirements.
PRELIMINARY DESIGN ACTIVITIES
The following services shall be provided by the CONSULTANT or an appropriately qualified subconsultant. In any case, the CONSULTANT shall be responsible for managing all subconsultants, including reviewing their work products prior to submission to OC SAN.
2.3.1 EASEMENTS, PROPERTY BOUNDARIES AND WORK AREA LIMITS
A. The Consultant shall identify easement and property boundary requirements and prepare easement documents, including performing any field investigations and survey required to identify and prepare easements.
B. Unless otherwise directed, the CONSULTANT shall identify, survey, and show all property boundaries, and all existing and proposed easements, within and/or adjacent to the project boundaries.
2.3
02-11-2022 Project No. 1-23 – Design SOW Page 18 of 52
C. Consultant shall show and explicitly identify the limits of work for all portions of the project, including any restrictions to the work allowed in any area, e.g., whether the area
can be used for parking or laydown.
D. All survey research and survey field work shall be performed by a Professional Land Surveyor licensed by the State of California.
2.3.2 TOPOGRAPHIC SURVEY
A. Control Surveys for Collection Systems
1. General: Topographical information used on the construction plans shall be generated from an aerial mapping process. CONSULTANT shall provide for the aerial and field surveys necessary for the mapping process for all applicable Project Elements of the project Scope of Work and shall provide for the aerial mapping. Providing for the process includes paying for, coordinating, and designing the aerial and horizontal/vertical control surveying for the preliminary and final design. CONSULTANT’s responsibilities for the surveys include generating any subconsultant scopes of work, data interpretation and preliminary design. All survey work is to be done under the direction and control of a Professional Land Surveyor, licensed by the State of California.
2. Aerial Survey: The aerial photography shall have sufficient coverage for the digital topographic mapping. The photo scale of the aerial photography shall not
be more than 100 feet per inch for pipeline work or 20-feet per inch for pump stations. Stereo pairs of photographs shall be furnished to OC SAN.
3. Field Survey Aerial: A field survey shall be used to establish both horizontal
and vertical control for the project. Control shall meet or exceed NGVD 88 requirements and shall be based on California State Plan Coordinates (NAD 83) including the 1995 O.C. surveyor’s adjustments. A sufficient number of points
shall be used to accurately complete the digital topographic modeling. No less than five control points per stereo model shall be used.
4. Aerial Field Survey Inclusions: The field survey shall include all survey monuments, topographic features, easements, property lines, culture, and elevations on the plan and profile sheets. All covers, including the existing sewer manholes, storm drain manholes, and utility and valve vaults shall be identified and marked in the field.
5. OC SAN Review Aerial Survey Line: The general location and alignment of the survey line shall be submitted to OC SAN prior to performing the field survey. Survey work shall not commence until authorized or concurred to by OC SAN. CONSULTANT shall be responsible for obtaining and paying for the field survey
services.
6. Field Survey Base Line: The field survey shall establish a base line for construction purposes for pipeline work equal to or greater than 500-feet in
length. The line will be used to define the proposed design, in terms of station and offset, and to establish the bearings for right-of-way. The survey line shall be set on 100-foot stations and shall be tied to the established aerial control.
The field survey shall tie in all controlling monuments within the map limits and all street centerline intersections. The ties shall be express in both State Plane Coordinates and as station and offset.
02-11-2022 Project No. 1-23 – Design SOW Page 19 of 52
7. Manhole Information: The field survey shall also include the measurement of the invert and manhole rim elevations of all existing sewers within the project
reach. The size, orientation and invert of any pipe connections shall also be recorded.
8. Base Map: The base map index contours shall be spaced at five feet (5-
feet) vertically and the immediate contours shall be spaced at one-foot (1-foot) contour intervals. The mapping shall include digital topographic mapping. The digital format shall be compatible with OC SAN Graphic Information System. All surface features, including those hidden from aerial view shall be incorporated into the digital mapping.
9. Plan and Profile Sheets: CONSULTANT shall prepare plan and profile sheets based upon the aerial mapping. The scale for plan and profile sheets shall be one-inch equals forty feet (1-inch = 40-feet) horizontal and one inch equals four feet (1-inch = 4-feet) vertical. An aerial photographic (photo strip) with the alignment shall be included. The plan view shall be separate from the photo strip. Intersections shall be adequately detailed at a scale of one-inch equals ten feet (1-inch = 10-feet) or one inch equals twenty feet (1-inch = 20-feet). Manholes and other details shall be drawn at a scale that is adequate to provide clarity and sufficient detail for construction. The basis of bearings and
benchmarks shall be indicated on the drawings,
10. Survey Note Submittal: CONSULTANT shall submit two bound copies of all survey notes and data used to establish vertical and horizontal control. The
information submitted shall be suitable for use to establish construction controls. If additional property and/or right-of-way are required, CONSULTANT shall identify property and/or rights-of-way to be acquired. CONSULTANT shall
prepare legal descriptions and plats for easements and property to be acquired during the final design phase of the project.
2.3.3 GEOTECHNICAL INVESTIGATION
A. CONSULTANT shall secure the services of a qualified Geotechnical Engineering firm to prepare a Geotechnical Data Report that addresses geotechnical concerns for all applicable Project Elements of the project Scope of Work
B. Soil Explorations
1. The geotechnical services shall include exploratory work such as soil borings necessary to observe, test, classify soils, and monitor groundwater levels and potential groundwater pollutants of concern.
2. The number and spacing of borings shall be based on the geotechnical
professional’s interpretation of needs and recommendation.
a. If unexpected or unique soils are encountered, an adequate number of borings shall be taken to try and define the limits of the anomaly.
3. The depth of the borings shall be adequate to characterize the soils to a depth of at least five feet below the bottom of an excavation or any proposed sewer invert elevation. At least two borings shall extend ten feet below the
proposed excavation bottom or sewer invert.
4. The proposal shall include five borings and a unit price allowance per boring in the proposal base price. Based on the actual number of borings performed in
02-11-2022 Project No. 1-23 – Design SOW Page 20 of 52
the project as determined and agreed upon by CONSULTANT and OC SAN, OC SAN will pay the final price in accordance with the per-unit allowance in the
CONSULTANT’s proposal.
C. Soil Sampling
1. Soil samples for testing shall be collected as needed based upon
CONSULTANT’s professional judgment. However, samples intervals shall not exceed two-foot depth intervals alternating SPT and RING samples in each boring. If borings are taken near existing sewers, samples shall be taken and delivered to OC SAN for testing for coliforms to determine if sewers are leaking.
D. Ground Water Pump Testing
1. Conduct one ground water pump test to determine dewatering parameters for inclusion of the specifications.
2. Provide a complete specification for the abandonment of wells for areas where aquifers could be compromised. Potential abandonment methods for deep penetrations might consist of over drilling and fill with cement-bentonite grout slurry, or deep pressure grouting to create a concrete seal.
E. Groundwater Contamination Testing
1. Perform complete lab analysis for all pollutants regulated under OCSD Local Discharge Limits (see page 33 of OCSD’s Wastewater Discharge Regulations
Ordinance No. 53).
F. Soil Exploration Locations
1. The location of all soil explorations shall be plotted on a map and attached to the Geotechnical Report. Preferably, the explorations shall include survey coordinates consistent with the project survey. Complete logs of the soil profiles shall be included in the report.
2. Explorations shall be located strategically within the footprint of the proposed excavation or on the centerline of proposed pipeline alignments. A total of two borings shall be cased and converted into water level monitoring wells for use during construction according to local agency requirements. CONSULTANT shall obtain all necessary permits for the installation of monitoring wells.
3. Work conducted within OC SAN’s treatment plants shall comply with the requirements of the OC SAN Stormwater Management Plan. Work conducted outside OC SAN’s treatment plant shall comply with the requirements of the local jurisdiction.
2.3.4 UTILITY INVESTIGATION
A. To better manage the risks associated with construction excavation, CONSULTANT
shall perform a thorough search of all utilities impacted by the work for all applicable Project Elements of this Scope of Work, regardless of size and all other facilities above or below ground. Utilities include all in-plant, utility company-owned and public agency-
owned piping, duct banks, and other interferences. The search shall include utilities within the public right-of-way, and those located on private property and OC SAN property impacted by the proposed project. The search shall include the records and
plans of OC SAN and all respective public and private companies and utilities.
B. Review of OC SAN Records
02-11-2022 Project No. 1-23 – Design SOW Page 21 of 52
1. OC SAN’s “As-built/Record” plans may be incomplete or inaccurate with respect to the routing of individual utilities, pipelines, etc. in the vicinity of the
project. CONSULTANT shall check OC SAN records against those of the other agencies, companies and utilities. These may include, but not be limited to, oil, gas, fuel, water, and sewer pipelines; traffic control facilities, telephone and
electrical conduit and duct banks, storm drains, manholes, and other structures.
C. Review of Outside Agency Records
1. CONSULTANT shall contact, in writing, all jurisdictional agencies and utility owners to inform them of OC SAN’s project. CONSULTANT shall request plans showing all the agencies or utility’s facilities, pipelines, etc. in the project area. CONSULTANT shall also request plans and schedules for all proposed construction in the project areas. CONSULTANT shall develop a schedule to minimize project conflicts and/or coordinate OC SAN projects with local agencies.
2. CONSULTANT shall personally visit each agency/company and search through all available plans, files, and documents. CONSULTANT shall meet with applicable field staff from each agency to confirm the completeness of their research. Abandoned utilities shall also be considered.
3. CONSULTANT shall document the contacts and information requested and received, including that from Underground Service Alert (USA). OC SAN shall be
copied on all correspondence between CONSULTANT and public and private agencies, and utility companies. CONSULTANT shall submit a copy of all documentation to OC SAN with an itemized submittal letter. CONSULTANT’s
Project Manager shall sign the transmittal cover letter and the cover letter shall confirm that CONSULTANT has sent a representative to each agency/company/utility, performed on-site inspections for each utility, and has
listed the utilities.
4. CONSULTANT shall contact USA and request a Substructure listing for the project area.
D. On-Site Inspection
1. An on-site inspection shall be made in the project area. During the on-site inspection, a senior-level CONSULTANT representative shall walk the site accompanied by OC SAN’s Project Engineer and Supervising Inspector. The CONSULTANT representative shall be experienced in the location and identification of utilities in the field. During the on-site inspection the CONSULTANT shall document all visible features that indicate utilities within the project area and compare them with the available utility plans.
E. Utilities for Adjacent Properties
1. CONSULTANT shall investigate all utilities serving properties adjacent to the work, and submit a spreadsheet at the end of the utility research accounting for
all anticipated utilities for OC SAN review, with the following information:
a. List all utilities anticipated or each adjacent property.
b. Indicate whether or not each such utility was found on as-built drawings of
any agency, with an identification of the agencies identifying such utility.
c. Indicate whether or not the utility was field located by utility through USA process, and, if so, by which agency.
02-11-2022 Project No. 1-23 – Design SOW Page 22 of 52
F. CONSULTANT shall provide all required stamped traffic control plans as part of the encroachment application process required by all cities for use during the geophysical
investigations, potholing, geotechnical borings, and field investigations.
G. Subsurface Utility Investigations
1. Investigation of existing utilities shall be in accordance with the respective
ASCE guidelines, except as amended by this Scope of Work. A brief description of the ASCE guidelines defines the Quality Level of detail for researching subsurface utilities as follows:
a. Quality Level D: Information derived from existing records or oral recollections.
b. Quality Level C: Information obtained by surveying and plotting visible above-ground utility features and by using professional judgment in correlating this information to Quality Level D information.
c. Quality Level B: Information obtained through the application of appropriate surface geophysical methods to determine the existence and approximate position of subsurface utilities. Quality Level B data shall be reproducible by surface geophysics, such as ground penetrating radar, at any point of their depiction. This information is surveyed to applicable tolerances and reduced onto plan documents.
d. Quality Level A: Precise horizontal and vertical location of utilities obtained by the actual exposure (or verification of previously exposed subsurface and surveyed utilities) and subsequent measurement of subsurface utilities, usually
at a specific point. Minimally intrusive excavation equipment is typically used to minimize the potential for utility damage. A precise horizontal and vertical location, as well as other utility attributes, is shown on the plan documents.
Accuracy is typically set to 15-mm vertical and to applicable horizontal survey and mapping accuracy.
2. Refer to CI/ASCE 38-02, Standard Guidelines for Collection and Depiction of Existing Subsurface Utility Data for details.
3. CONSULTANT shall determine all utilities impacted by the work for all applicable Project Elements of this Scope of Work. Utilities include utility company-owned, and public agency-owned piping, duct banks, and other interferences. All utilities encountered during the preliminary design shall be shown on the plans.
4. Subsurface investigation for all utilities in and around the work area shall be performed to Quality Level D and Quality Level C. All utilities shall be plotted
both in plan and profile on a scaled drawing that can later be incorporated into scaled (1-inch = 40-feet) plan drawings.
5. CONSULTANT shall submit, for acceptance by OC SAN, recommendations
on which utilities should be investigated to Quality Level A and where Quality Level B investigations should be performed. As part of the submittal, a Potholing Plan and Geophysical Investigation Plan shall be developed including proposed
pothole locations and type of geophysical investigation.
6. Prior to OC SAN’s acceptance of the Potholing Plan/Geophysical Investigation Plan, a project field walk by the CONSULTANT Project Manager,
02-11-2022 Project No. 1-23 – Design SOW Page 23 of 52
OC SAN Project Engineer, Supervising Inspector, and other designated OC SAN personnel shall be performed.
H. Potholes and Geophysical Investigation
1. CONSULTANT shall secure the services of a subcontractor to perform the pothole work and geophysical investigation (including ground-penetrating radar).
2. CONSULTANT shall pothole and perform geophysical investigation on all utilities described and shown in the accepted Potholing Plan/Geophysical Investigation Plan. CONSULTANT’s staff shall be available, if required, to be on-site during potholing to provide direction to potholing crew. OC SAN staff shall also be present during potholing. Field investigations include visiting the project work site and each utility to verify the location of all interferences.
3. CONSULTANT shall provide all the related work necessary, including, but not limited to:
a. Documentation of information
b. Notification of USA’s “Dig Alert”
c. Providing field survey
d. Obtaining required permits
e. Submission of traffic control plans
f. Setting up traffic control
g. Soft dig potholing
h. Ground-penetrating radar
i. Excavating
j. Backfilling
k. Repairing pavement to local jurisdiction requirements. It is assumed that a total of four locations will take place within Alton Ave currently under moratorium
between Raitt St. and Bristol St.
4. “Soft” excavation potholing methods such as vacuum extraction is preferred; however, excavation methods shall be chosen to adequately define the utility. Crosscut trenches may be preferred for defining some utility locations. Hydro-jetting soft dig should be avoided in sandy, wet and contaminated soil conditions.
5. Potholing subcontractor shall measure and document the depth of pavement and of base material at each pothole, and every five feet along crosscut trenches.
6. Work conducted within OC SAN’s treatment plants shall comply with the requirements of the OC SAN Stormwater Management Plan. Work conducted outside OC SAN’s treatment plant shall comply with the requirements of the local
jurisdiction.
7. CONSULTANT shall provide a licensed land surveyor or hire a licensed survey subcontractor(s) to field-locate the actual horizontal and vertical location
of the constructed potholes. Survey controls shall be set and coordinated with the survey controls used on previous construction drawings. City and County control points shall be checked; northing, easting and elevation data for each
02-11-2022 Project No. 1-23 – Design SOW Page 24 of 52
pothole shall be shown on the Contract Drawings; and physical tie-ins provided in order to easily re-establish pothole locations after construction. CONSULTANT
shall supply and supervise survey work and subcontractors needed to perform the pothole work. Survey datum differences shall also be reconciled.
8. The results of potholing and geophysical efforts shall be summarized in a
field finding report.
9. CONSULTANT shall backfill and repair potholes consistent with the requirements of the local jurisdiction. If CONSULTANT is unable to determine local jurisdiction requirements prior to the proposal, CONSULTANT shall assume the following requirements:
a. The materials removed from the excavation may not be used for backfill, unless approved by the local jurisdiction. If approved, excavated material used to fill potholes shall be placed with a maximum lift thickness of four inches and mechanically compacted.
b. If not approved, the CONSULTANT shall be responsible for hauling off and disposing of excavated pothole material. In this case, excavation holes shall be filled with a cement slurry mix from the bottom up. The excavated materials shall be tested for hazardous materials and disposed of offsite accordingly. Testing shall be the minimum required for classifying the materials. The
potholing samples shall be tested by a California Environmental Laboratory Accreditation Program (ELAP) certified laboratory to identify characteristics of hazardous waste. A substance shall be considered hazardous if it possesses
properties of toxicity, ignitability, corrosivity and/or reactivity per California Code of Regulations Title 22, Section 66261. In addition, Minimum the laboratory testing shall include an on-site Organic Vapor Analyzer (OVA) test for potential
hydrocarbon contaminants. Should the OVA reading be equal to or greater than 45 ppm, further laboratory Minimum testing shall be performed to include Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) test per EPA guideline 8020 and Total Hydrocarbons (TPH) tests per EPA guideline. should the OVA reading be equal to or greater than 45 ppm.
c. AC pavement shall be replaced to full depth or the structural section (AC & Base) plus two inches with hot mix asphalt unless otherwise required by the City. Cold mix shall only be allowed when the patch will be replaced by the project and were approved by the City.
d. Concrete pavement shall be replaced to full depth plus two inches with Portland cement unless otherwise required by the City.
I. Quantitative Assumptions
1. CONSULTANT’s fee proposal shall include a cost for potholes and unit cost for additional potholes. The cost shall provide for a minimum of fifty five (55)
potholes during preliminary design and twenty (20) potholes during final design.
2. CONSULTANT’s fee proposal shall include a cost for geophysical investigation using ground penetrating radar. The cost shall provide for a
maximum of 10,000 square feet during preliminary design and shall follow the alignment of the proposed air jumpers and footprint of the proposed new manhole.
J. Depiction of Utilities and Potholes on Plans
02-11-2022 Project No. 1-23 – Design SOW Page 25 of 52
1. All utilities encountered during the preliminary design shall be shown on the Plans. Project work that requires other agencies to relocate existing utilities shall
be coordinated during the design by CONSULTANT. Each subsurface utility shown on the drawings shall include the Quality Level to which it was investigated as required by CI/ASCE 38-02. Pothole locations shall be shown on
drawings with survey information.
K. Relocation of Existing Utilities
1. Project work that requires other agencies to relocate existing utilities shall be coordinated during design by CONSULTANT.
2.3.5 PUBLIC RELATIONS
A. The CONSULTANT shall secure the services of a Public Outreach Subconsultant to conduct all public outreach activities required during preliminary and design phases.. The subconsultant’s services are currently anticipated to be required during the construction phase.
B. OC SAN’s Public Affairs Office (PAO) will share with the public the general scope of the project during design, construction impacts for design and construction activities and the project’s progress. The subconsultant will possess a full range of professional public outreach skills and an understanding of the issues, audiences and technical process required to support PAO during community outreach activities required for the
project.
C. The primary goal of the public outreach effort is to inform motorists, merchants, employers, hospitals, local residents, schools, and elected officials about the project
need, construction impacts during design phase, and steps that can be taken to minimize those impacts.
D. The CONSULTANT shall assist OC SAN by providing public information proactively
through written and electronic media sources and providing quick responses and resolutions to community concerns to keep the project/program moving forward. The public outreach program is an effective tool for building partnerships and reaching affected audiences during and in preparation for construction documents.
E. The CONSULTANT shall coordinate all public outreach work with cities, agencies and the public with OC SAN’s PAO.
F. The team selected will be required to attend and participate in technical team meetings as appropriate. It is estimated 2 general community meetings, 6 HOA/community meetings, and 15 team meetings will be required. CONSULTANT shall also participate in the following:
1. Identify stakeholders including but not limited to cities, agencies, residents,
businesses, schools, etc.
2. Develop project announcement and updates (written announcement and map).
3. Development and review of documents and maps for mass mailings of letters and notifications.
4. Coordinate neighborhood meetings, send invitations, attend, facilitate,
summarize meetings, and follow up.
02-11-2022 Project No. 1-23 – Design SOW Page 26 of 52
5. Inform the public prior to the start of construction to minimize surprises that may become the sources of complaints.
6. Inform and remind the public of the long-term benefits of the project.
7. Reassure the public that neighborhood impacts, which are a high priority of OC SAN, have been thoroughly assessed and mitigated.
8. Help the impacted public feel involved and part of the process.
9. Demonstrate concern and good faith by responding quickly and earnestly to address issues and provide reasonable solutions to concerns or complaints.
10. Attend workshops to discuss design alternatives to minimize public impacts.
11. Build on the existing OC SAN logo to establish project/program identification.
12. Identify outreach outlets/tools – local newspapers, city newsletters, community newsletters, HOA’s, business groups, social media, etc.
13. Develop a public outreach plan to be implemented during design and construction. Plan shall include a Public Impacts Table to evaluate potential impacts to the public, and recommend mitigation measures to be implemented during design and construction phases, not limited to the following:
a. Identify project stakeholders – Provide contact information.
b. Identify audience (church, commuters, residence, etc.) and number of people impacted.
c. Identify activities to be performed during design phase, estimated duration, and anticipated public impacts.
d. Identify activities to be performed during construction phase, estimated
duration and anticipated public impacts.
e. Review and provide analysis of available mitigation measures to reduce, control or eliminate impacts identified.
f. Develop list of anticipated work restrictions imposed by affected cities, agencies, and other stakeholders.
g. Identify special events in the area, day, and duration during design and construction.
h. Identify schedule and scope of current, ongoing, and future construction projects of other cities and agencies within project area.
i. Recommend measures to be implemented during design and construction activities.
j. Identify work by other agencies in same area during the same timeframe for design and construction activities.
k. Rate public impacts (high, medium, and low)
14. Develop Public Impacts Design Memo. The Public Impacts Table shall be included in the Public Impacts Design Memo.
15. Update and maintain public impact documents through the preliminary design
and design phases.
02-11-2022 Project No. 1-23 – Design SOW Page 27 of 52
G. Stakeholders that will require early coordination include:
1. Segerstrom High School
2. Thorpe Elementary School
3. Kaiser Permanente
4. Bristol Place Businesses
5. South Coast Business Park
6. Other affected businesses
7. Local HOAs, including The Aspens, Charleston at South Coast, and
Armstrong Ranch
2.3.6 SPECIALTY SERVICE
A. Right of Way and Real Estate
1. CONSULTANT shall determine access, easement, and laydown areas on private property.
2. CONSULTANT shall secure the services of a qualified Right of Way and Real Estate firm to identify all property owners and tenants within the work area. Previous experience working with public agencies on similar projects is required.
3. The Right of Way and Real Estate firm shall lead coordination between OC SAN, property owners and tenants and aid in negotiating temporary agreements required for project implementation. Prepare all required exhibits and legal
descriptions needed for this work. Up to twelve (12) temporary agreements and one easement legal description is anticipated.
4. The Right of Way and Real Estate firm shall have a real estate appraiser with
a Certified General License in the state of California to appraise the value of property within easements that OC SAN may require for temporary construction access and permanent access to manholes.
B. Flow Monitoring
1. CONSULTANT shall perform flow monitoring. Assume three locations. The flow measurements (five-minute intervals) shall be made continuously during the wet season from November 1st to March 31st and shall capture at least two weeks during dry weather conditions and at least two weeks during dry weather with modified diversion settings. CONSULTANT shall be responsible for all aspects required for accurate flow monitoring including but not limited to permits, confined space entry, manhole repairs if liner is damaged or penetrated, traffic plans and control (to set and retrieve monitors), materials, labor, and equipment. CONSULTANT may also choose to retain and pay for a flow monitoring company to perform such services. The flow patterns and flows shall be used to verify
flows calculated in the hydraulic model based upon land use and to calibrate the model. Assume each flow monitor will need to be removed and re-installed two times to facilitate cleaning.
2. Flows: CONSULTANT shall project future flow (based on measured flow). Flow projections shall be for 2040. Projections shall include minimum, average, and peak flows for dry and wet weather conditions. Flow calculations shall be
consistent with methods used in the master plan and hydraulic model (PS15-08).
02-11-2022 Project No. 1-23 – Design SOW Page 28 of 52
Discrepancies in calculated flows and the hydraulic model flows shall be promptly brought to the attention of OC SAN. Concerns Consultant may have regarding
the hydraulic model, based upon Consultant’s experience or observations shall be promptly brought to the attention of OC SAN.
3. Air Pressure Monitoring: Consultant shall provide field monitoring of air
pressure in the sewer utilizing differential air pressure loggers. Assume six (6) manhole locations along the Santa Ana sewer between the OC SAN Plant No. 1 and the east end of the Project near the Bristol Street intersection. Manhole locations will be identified during preliminary design phase and coordinated with OC SAN prior to initiating any field activities. CONSULTANT shall be responsible for all aspects required for the pressure monitoring including but not limited to permits, confined space entry, manhole repairs if liner is damaged or penetrated, traffic plans and control (to set and retrieve monitors), materials, labor, and equipment.
C. Sonar
1. CONSULTANT shall perform a sonar investigation of the 48-inch Greenville-Banning Channel siphon and the triple barrel (15-inch/24-inch/27-inch) Santa Ana Gardens Channel siphon to estimate the required cleaning effort in construction and determine if the pipeline is suitable for lining.
2. CONSULTANT shall provide all required stamped traffic control plans as part of the encroachment application process required by all cities for use during the sonar investigations.
2.3.7 VALUE ENGINEERING ASSISTANCE (NOT USED)
2.3.8 ENVIRONMENTAL DOCUMENTATION
A. OC San will process a Notice of Exemption to be applied to this project.
CONSTULTANT shall provide support if requested by OC SAN for documentation.
B. CONSULTANT services related to Environmental Documentation may span across Phase 2 – Preliminary Design and Phase 3 - Design. When such services are required, they shall be based on the requirements of Section III – Project Schedule and based on the following requirements. The CONSULTANT shall allocate the budgeted hours between the Environmental Documentation services in Phase 2 and Phase 3 based on when these services will be required. – CONSULTANT shall review existing Programmatic Environmental Impact Report and existing Mitigation, Monitoring, and Reporting Program (MMRP) to determine appropriate mitigation measures to be applied to this project. Development of a new MMRP is not included in this scope of work.
2.3.9 PERMITTING ASSISTANCE
A. CONSULTANT services related to Permitting Assistance may span across Phase 2 – Preliminary Design and Phase 3 - Design. When such services are required, they will
be based on the requirements of Section III – Project Schedule and the schedule constraints associated with each particular permit. The CONSULTANT shall allocate the budgeted hours between the Permitting Assistance services in Phase 2 and
Phase 3 based on when these services will be required.
B. For all applicable Project Elements of this Scope of Work, CONSULTANT shall provide Bid Documents that ensure that the facility features and the facility
02-11-2022 Project No. 1-23 – Design SOW Page 29 of 52
performance, and construction procedures comply with all conditions of existing permits and permits required to construct this project. Construction drawings, specifications
and supplemental drawings shall be prepared, as necessary, in the format required to obtain all permits.
C. CONSULTANT shall assist OC SAN in obtaining permits. This assistance shall
include completing application forms provided by OC SAN, preparing supporting documentation for the permit applications as required by the issuing agency, furnishing the required number of copies of all construction drawings and exhibits, and attending meetings with permitting agencies at the request of OC SAN.
D. With the exception of construction contractor-furnished permits, OC SAN staff will execute all applications. All permit fees will be paid directly by OC SAN and are not part of CONSULTANT’s fee.
E. CONSULTANT shall submit all supporting documentation in a timely fashion for all permits required for this project as described below.
F. CONSULTANT shall meet with all agencies during Preliminary Design to present conceptual traffic control and design drawings and receive input prior to submitting for permits.
G. CONSULTANT shall submit for all permits by DS-2.
H. City/County Encroachment Permits
1. City of Santa Ana
2. City of Costa Mesa
3. County of Orange (Flood District)
4. The CONSULTANT shall assume fifteen meetings at two hours each.
I. Stormwater Permitting
1. CONSULTANT shall determine the required stormwater permit.
2. If a SWPPP is required, CONSULTANT shall determine and specify the preliminary Risk Level and Project Type using the California State Water Resources Control Board’s Storm Water Multiple Application and Report Tracking System (SMARTS) based on the R-Factor obtained from US EPA’s online Rainfall Erosivity Factor Calculator for Small Construction Sites.
3. CONSULTANT shall prepare the specification for stormwater using OC SAN’s respective master specification as a starting point. If a SWPPP is required, CONSULTANT shall not begin work on editing the specification until OC SAN has approved the Consultant’s preliminary Risk Level and Project Type.
4. If a SWPPP is required, it is OC SAN’s intent to design linear underground/overhead projects (LUP) to LUP Type 2 requirements, whenever
possible, which is often the most economical approach. CONSULTANT shall coordinate with the OC SAN Project Manager and OC SAN Environmental Compliance Division and edit Stormwater Pollution Prevention Plan specifications
accordingly.
J. Railroad Permits
1. Crossing Permit (if required for air jumpers)
02-11-2022 Project No. 1-23 – Design SOW Page 30 of 52
2. Encroachment Permit (if required for air jumpers)
3. Right of Entry/Temporary Use of Railroad Property (if required)
4. Assume five meetings at two hours each
2.3.10 PROJECT MANAGEMENT
A. CONSULTANT shall be responsible for managing CONSULTANT’s project
execution, schedule, budget, subconsultants, and coordination with other projects. The CONSULTANT shall perform the project management requirements in accordance with Exhibit 3 - Project Management Requirements with the project specific options identified below.
B. Project Management Plan (PMP):
☐Not required
☒Required
PMP approval prior to beginning technical work on the project. Assume 15 pages, not including attachments.
C. Project Logs
☒Major Decision Log
☒Project Decision Log
☒Action Item Log
☒Decision Issues Log
☒Meeting Log
☒Risk Management Log
D. Progress Report, Status of Cost Model
☐Not required
☒Required
E. Project Invoices
1. Estimating earned value, tasks shall be further broken down to subtasks of no more than $100,000.
2. Costs for invoicing shall be grouped into the following work packages:
Work Package Description Tasks
3146 Preliminary Design All Phase 2 tasks, except those listed above.
3158 Environmental Documentation Task 2.3.8
3250 CONSULTANT Services During Design Tasks 3.6 through 3.12
3251 Design Submittal 1
3252 Design Submittal 2
02-11-2022 Project No. 1-23 – Design SOW Page 31 of 52
Work Package Description Tasks
3253 Design Submittal 3
Tasks 3.1 through 3.4, divided into effort by design submittal. FDS is charged against DS3.
3254 Bid Support Services Task 3.4
2.3.11 RISK MANAGEMENT
A. When required below, CONSULTANT shall provide risk management in accordance with Exhibit 4 - Risk Management Requirements with the project specific options identified below.
B. Risk Management:
☐Not required
☒Required
Initial Risk Workshop PDR Risk Management Workshop: three hours (held three weeks prior to draft
PDR at OC SAN) and will be held virtually.
C. Moderator
1. CONSULTANT shall provide a suitably qualified moderator to conduct the Workshops defined in Exhibit 4 - Risk Management Requirements. The moderator shall have the following attributes:
a. Sufficiently technically knowledgeable to understand the nature of the risks involved, but the moderator need not be a subject matter expert.
2. The Preliminary Design Risk Management Workshop shall be planned and
scheduled for a duration of four hours and will be held at OC SAN offices.
2.3.12 QUALITY CONTROL
A. The CONSULTANT shall provide quality control requirements in accordance with Exhibit 6 - Quality Control Requirements.
PDR WORKSHOPS AND MEETINGS
2.4.1 GENERAL
A. Workshop and meeting planning, requirements, agendas, and meeting minutes shall be in accordance with Exhibit 5 - Workshop and Meeting Requirements.
2.4.2 PDR PRODUCTION WORKSHOPS
A. Predesign Kickoff Workshop
1. A two-hour project kick-off meeting shall be held with OC SAN staff to introduce principal members of OC SAN and CONSULTANT’s teams. The
discussion topics shall include: OC SAN responsibilities, CONSULTANT’s responsibilities, invoice procedures, personnel badges, parking, site access, CONSULTANT’s Scope of Work, detailed project schedule with milestones, Work
Breakdown Structure requirements, and OC SAN confined space and other safety policy training.
B. PDR Production Workshops shall be held during Preliminary Design to review the topics listed below. The list below also indicates the number of workshops to be held to
2.4
02-11-2022 Project No. 1-23 – Design SOW Page 32 of 52
cover the specific topic. Unless otherwise noted, each workshop shall be 4 hours in length. Assume all PDR Workshops are virtual.
PDR PRODUCTION WORKSHOPS
TOPIC NUMBER OF WORKSHOPS
PDR Production Kickoff 1
PDR Production Workshops
Rehabilitation Alternatives 1
Hydraulic Analysis 2
Basis of Design 1
Utility Investigations and Geotechnical 1
Public Impacts 1
Traffic Control 1
Permit Requirements 1
Environmental, Stormwater and Regulatory Requirements 1
Implementation Plan and Sequencing Constraints1 2
1Assume a two-hour site visit accompanied by a four-hour workshop.
2.4.3 PDR REVIEW WORKSHOPS
A. CONSULTANT shall hold the following workshops to review the draft Preliminary Design Report as required in Exhibit 5 - Workshop and Meeting Requirements:
1. Design Memo Validation Meetings (assume twelve three-hour meetings).
CONSUTANT shall review responses to OC SAN comments.
2. Draft PDR Presentation Workshop (assume four hours)
3. Draft PDR Validation Workshop (assume four hours)
4. PDR Validation Workshop (assume four hours)
2.4.4 PDR CONSTRUCTABILITY WORKSHOP
A. A constructability workshop shall be held after the draft PDR submittal review to
identify any fatal flaws in the design relative to constructability. Some of the subjects that shall be covered in this workshop include the following: conflicts between design disciplines, traffic control, geotechnical considerations, construction sequencing, safety, access for maintenance, size-critical equipment requirements and constraints, air jumper location, permitting, public nuisance issues, other local conditions and constraints.
B. This workshop shall be held at OC SAN facilities and shall generally be four hours in length. OC SAN and CONSULTANT staff shall attend this workshop.
C. CONSULTANT shall be responsible for completing the following tasks relative to the workshop:
02-11-2022 Project No. 1-23 – Design SOW Page 33 of 52
1. Prepare package for constructability review workshop participants. The package shall consist of detailed plans and specifications and other information
selected by CONSULTANT.
2. Prepare presentation on the project.
3. Summarize the constructability review workshop comments and action taken
on each comment in a memorandum.
4. All comments and recommendations of the workshop shall be incorporated into Implementation Plan Design Memo and the Bid Documents.
2.4.5 TECHNICAL PROGRESS MEETINGS
A. Technical Progress Meetings shall be held every four weeks for two hours to review various issues with OC SAN’s project team. Assume a total of twelve virtual meetings shall be held during Preliminary Design Phase. The CONSULTANT shall coordinate with the OC SAN Project Manager to determine what topics will be covered in what meetings, and what OC SAN and CONSULTANT team members are required for each.
2.4.6 FOCUSED MEETINGS
A. Focused meetings shall be held throughout preliminary design to discuss specific issues in detail and generate comments and direction from OC SAN staff. Assume one-hour virtual weekly meetings unless noted otherwise. The following tentative list of topics may be covered in these meetings:
1. Site survey
2. Site meetings (traffic, site walk, public outreach, cleaning, etc.). Assume five four-hour in person meetings.
3. Site utility coordination
4. Geotechnical report
5. Quality control plan
6. Hydraulics and Hydraulic Modeling (several meetings as necessary)
7. Permits
8. OC SAN’s Contractor Safety Standards, confined space and other safety requirements
9. City requirements
10. Survey and geotechnical requirements (including potentially contaminated
soil)
11. Potholing
12. Utilities and utility tie-ins
13. Public Outreach
14. Public Outreach field meetings. Assume five two-hour meetings
15. Bypass Pumping (several meetings as necessary)
16. Construction sequencing
17. Safety
02-11-2022 Project No. 1-23 – Design SOW Page 34 of 52
18. Special studies (including sonar, noise and flow monitoring)
19. Coordination with other projects
20. Additional meetings as necessary
B. Meeting lengths shall be as required to cover the topic in question. Depending on subject matter and attendees, one meeting may cover multiple subjects.
CONSULTANT shall determine how many meetings will be needed to cover these topics. CONSULTANT may suggest additional topics as necessary. Supplementary meetings may be scheduled with OC SAN staff, as necessary to allow coordination between CONSULTANT and OC SAN staff.
2.4.7 COORDINATION WITH OTHER PROJECTS MEETINGS
A. The project shall be a complete and fully functional facility that is integrated with existing facilities and coordinated with other construction projects. CONSULTANT shall coordinate potential conflicts with the following adjacent projects and participate in the number of meetings indicated in the following table:
PROJECT COORDINATION MEETINGS
PROJECT PROJECT DESCRIPTION COORDINATION MEETINGS
P1-105 Headworks Rehabilitation at Plant 1 1 meetings @ 1 hour
1-24 Greenville Sub-Trunk Improvements 1 meetings @ 2 hours
FE19-04 Sunflower Pump Replacement at Plant 1 1 meeting @ 1 hour
One Metro West 15-acre mixed-use community development
north of the 405 freeway in Costa Mesa.
2 meetings @ 1 hour
2.4.8 STORMWATER COMPLIANCE MEETING
A. A formal meeting shall be held with OC SAN’s stormwater compliance staff to review the project scope and identify all issues during and after construction affecting compliance with stormwater regulatory requirements and OC SAN’s policies and practices.
3. PHASE 3 – DESIGN
BID DOCUMENTS
3.0.1 GENERAL
A. CONSULTANT shall provide engineering services to prepare biddable plans, technical specifications, and other Bid Documents as required based on the design concepts and criteria developed during Phase 2 - Preliminary Design. In this Scope of Work, construction documents include specifications; drawings, traffic control plans, and bypassing plans.
3.0.2 ENGINEERING DESIGN GUIDELINE UPDATES
3.0
02-11-2022 Project No. 1-23 – Design SOW Page 35 of 52
A. All changes in OC SAN’s Engineering Standards, OC SAN’s Design Guidelines, and/or changes in design concepts and facility layouts as a result of OC SAN
comments that may occur up to transmittal of OC SAN comments on Design Submittal 1, shall be incorporated into the Design by CONSULTANT with no increase in CONSULTANT’s Not-to-Exceed upper limit on fees.
3.0.3 GENERAL REQUIREMENTS AND ADDITIONAL GENERAL REQUIREMENTS
A. The following are the minimum Additional GRs topics required for this project:
☒Summary of Work
☒Work Sequence
☒Work Restrictions for Collections
☒Permits
☐Environmental Restrictions and Controls
☒Measurement and Payment (includes Mobilization/Demobilization)
☒Contractors Construction Schedule and Reports
☐Seismic Design Criteria (for those restraints, supports, etc. to be design by the
Contractor)
☒Shipping, Storage and Handling
☒Traffic Control
☒Contractor and Engineer’s Field Offices
☒Project Control Management System (PMWeb construction management
software)
☐Equipment Service Manuals
☐Equipment and Instrument Database (EID)
☐Training of OC SAN Personnel
☒Hazardous Materials Mitigation and Controls
☐Mold Remediation and Controls
3.0.4 DESIGN SUBMITTALS
A. The CONSULTANT shall produce the following design submittals as indicated below in accordance with Exhibit 2 - Design Requirements. If a design submittal is
eliminated, then the design submittal shall include the requirements associated with the required design submittal along with the requirements associated with the previous unchecked design submittals.
☒Design Submittal 1
☒Design Submittal 2
☒Design Submittal 3
☒Final Design Submittal
B. Continuing Work After Design Submittal Submission
☐CONSULTANT is expected to continue design work on the project while OC
SAN staff reviews Design Submittal 1 and Design Submittal 2. For Design Submittal 3, CONSULTANT shall stop all design work until receipt of OC SAN comments on that submittal.
☒CONSULTANT is expected to stop design work on the project until OC SAN
staff completes the review of each Design Submittal.
02-11-2022 Project No. 1-23 – Design SOW Page 36 of 52
3.0.5 CONSTRUCTION SUBMITTAL ITEMS LIST
☐OC SAN will develop the Construction Submittal Items List in accordance with
Exhibit 2 - Design Requirements.
☒CONSULTANT shall develop the Construction Submittal Items List in accordance
with Exhibit 2 - Design Requirements.
3.0.6 TEMPORARY FACILITIES DURING CONTRUCTION
☐Temporary facilities and bypass pumping are not required.
☐Temporary facilities and bypassing during construction are required, as described
under the “Temporary Facilities During Construction” paragraph under the Project
Elements and shall be described in words on the drawings and technical specifications.
☒Detailed plans and work sequence for temporary facilities, traffic control and
bypassing during construction, as described under the “Temporary Facilities During Construction” paragraph under the Project Elements.
DESIGN SUPPORT DOCUMENTATION
3.1.1 DESIGN SUBMITTAL SUPPORT DOCUMENTATION
A. The CONSULTANT shall provide a Design Submittal Support Documentation in accordance Exhibit 2 - Design Requirements.
B. Design Information
1. CONSULTANT shall include the following material with each Design Submittal:
a. CONSULTANT shall maintain the Project Logs specified under Phase 2 Project Management through Phase 3. Current copies of all logs shall be included with each Design Submittal.
b. Written response log to OC SAN comments on the previous submittal.
c. CEQA and Regulatory Compliance Matrix. This matrix shall list each applicable CEQA mitigation requirement and all known permit requirements with the corresponding description of how each requirement is to be satisfied. Measures to satisfy requirements might be in the GRs, Additional GRs, particular specification requirements, or actions taken separately from the construction contract.
d. Calculations
e. Draft or final Geotechnical Reports.
f. Proposed list of suppliers to be named in the specifications for major equipment
g. Draft or final Field Findings Reports not submitted in the previous submittal and those revised since the previous submittal.
h. Equipment catalog cuts and vendor quotations.
i. All memos that have been prepared since the previous submittal was delivered.
C. Facility Operation and Maintenance
3.1
02-11-2022 Project No. 1-23 – Design SOW Page 37 of 52
☒Not required.
☐Update operating philosophies
☐Update estimates of Operation and Maintenance staffing requirements
D. Electrical Deign Documentation
☒Electrical design documentation not required.
☐Updated Electrical Load Criticality Table
☐Electrical Analysis Report
☐Load list for all equipment
☐Equipment sizing from three manufacturers for motor control centers, switchgear,
transformers, and power panels
☐Lighting calculations
☐Standby generator sizing calculations
☐Ductbank cable pulling tension, derating, and cable tray fill calculations
E. Power System Studies
☒ETAP not required.
☐Plant ETAP model for the project performed by OC SAN.
☐Plant ETAP model for the project performed by CONSULTANT.
☐Electrical Systems Analysis Report performed by CONSULTANT.
3.1.2 CONSTRUCTION COST ESTIMATE
A. The CONSULTANT shall provide a cost estimate for the associated design
submittal indicated below in accordance with Exhibit 2 - Design Requirements.
☒Design Submittal 1
☒Design Submittal 2
☒Design Submittal 3
☒Final Design Submittal
3.1.3 CONSTRUCTION SCHEDULE
A. The CONSULTANT shall provide a Preliminary Construction Schedule for the
associated design submittal indicated below in accordance with Exhibit 2 - Design Requirements.
☐Construction Schedule is not Required
☒Design Submittal 1
☒Design Submittal 2
☒Design Submittal 3
☒Final Design Submittal
3.1.4 PROCUREMENT ALTERNATIVES
A. The CONSULTANT shall recommend the appropriate procurement alternatives as described in Exhibit 2 - Design Requirements.
☒Procurement alternatives not required
☐Procurement alternatives required
DESIGN ACTIVITIES 3.2
02-11-2022 Project No. 1-23 – Design SOW Page 38 of 52
The following services shall be provided by the CONSULTANT or an appropriately qualified subconsultant. In any case, the CONSULTANT shall be responsible for managing all
subconsultants, including reviewing their work products prior to submission to OC SAN.
3.2.1 EASEMENTS, PROPERTY BOUNDARIES AND WORK AREA LIMITS
A. CONSULTANT services related to Easements, Property Boundaries and Work Area
Limits on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will be required.
3.2.2 TOPOGRAPHIC SURVEY
A. CONSULTANT services related to Topographic Survey on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will be required.
3.2.3 UTILITY INVESTIGATION
A. CONSULTANT services related to Utility Investigation on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will be required.
B. Final Design Submittal Utility Coordination Reviews
1. During DS3 submittal review, the CONSULTANT shall meet with outside agencies to verify any changes made by agency during final design period and compare them with the Contract Drawings. CONSULTANT shall follow through with due diligence on utilities that do not participate in the USA program, unknown owner of a facility and/or abandoned utilities.
2. During DS3 submittal review, an on-site inspection shall be made in the project area. During the on-site inspection, a senior-level CONSULTANT representative shall walk the site accompanied by OC SAN’s Project Engineer and Supervising Inspector. The CONSULTANT’s representative shall be experienced in the location and identification of utilities in the field. During the on-site inspection the CONSULTANT shall document all visible features that indicate utilities within the project area and compare them with the Contract Drawings.
3.2.4 NOISE EVALUATION SERVICES
A. CONSULTANT shall determine if advanced noise evaluation services is required and secure the services of a Subconsultant to prepare a field finding Noise Report, if
required. This report shall include the following:
1. Visit site and conduct ambient noise measurements to establish baseline. Assume noise measurements are required at five sites.
2. Identify external sources of noise.
3. Identify potential methods for defining noise impacts.
4. Develop noise model consistent with noise impact assessment methods.
5. Determine exterior noise levels and compliance with assessment standards.
02-11-2022 Project No. 1-23 – Design SOW Page 39 of 52
6. If required, develop mitigation measures to meet design standards.
7. Determine compliance with OSHA’s regulations.
8. If needed, determine mitigation measures to meet OSHA’s requirements.
9. Prepare written report on findings and recommendations.
3.2.5 TRAFFIC CONTROL SERVICES
A. CONSULTANT shall determine traffic control requirements and prepare plans and specifications for all construction activities performed within or adjacent to the public ROW. The traffic control plans shall be approved by the AHJ by FDS. Additionally, the Traffic Control designer shall attend City and OC SAN Submittal review meetings, workshops, validation meetings and focus meetings, as needed.
3.2.6 PUBLIC RELATIONS
A. CONSULTANT services related to Public Relations on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 - Design. The CONSULTANT shall allocate the budgeted hours between the Public Relations services in Phase 2 and Phase 3 based on when these services will be required.
3.2.7 SPECIALTY SERVICE
A. CONSULTANT services related to Right of Way and Real Estate on the project are specified in Phase 2 – Preliminary Design and those services shall continue during
Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between Phase 2 and Phase 3 based on when these services will be required.
3.2.8 ENVIRONMENTAL DOCUMENTATION
A. CONSULTANT services related to Environmental Documentation on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 - Design. The CONSULTANT shall allocate the budgeted hours between the
Environmental Documentation services in Phase 2 and Phase 3 based on when these services will be required.
3.2.9 PERMITTING ASSISTANCE
A. CONSULTANT services related to Permitting Assistance on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 - Design. CONSULTANT shall allocate the budgeted hours between the Permitting Assistance services in Phase 2 and Phase 3 based on when these services will be required.
3.2.10 PROJECT MANAGEMENT
A. CONSULTANT shall be responsible for managing CONSULTANT’s project execution, schedule, budget, subconsultants, and coordination with other projects.
CONSULTANT services related to Project Management on the project are specified in Phase 2 – Preliminary Design and those services shall continue during Phase 3 – Design as required. CONSULTANT shall allocate the budgeted hours between
Phase 2 and Phase 3 based on when these services will be required.
3.2.11 RISK MANAGEMENT
02-11-2022 Project No. 1-23 – Design SOW Page 40 of 52
A. CONSULTANT shall provide risk management in accordance with Exhibit 4 - Risk Management Requirements. Moderator shall be as specified for Phase 2 –
Preliminary Design.
B. Risk Management:
☐Not required
☒Required
☒DS1 Risk Workshops: 1 hour (held during OC SAN’s review of DS1 at OC SAN)
☒DS2 Risk Workshops: 1 hour (held during OC SAN’s review of DS2 at OC SAN)
☒DS3 Risk Workshop: 2 hours (held during OC SAN’s review of DS3 at OC SAN)
3.2.12 QUALITY CONTROL
A. The CONSULTANT shall provide Quality Control requirements in accordance with Exhibit 6 - Quality Control Requirements.
☒Independent Multi-Discipline Design Workshop is not required.
☐Independent Multi-Discipline Design Workshop is required. (minimum duration of 4
days)
DESIGN WORKSHOPS AND MEETINGS
3.3.1 GENERAL
A. Workshop and meeting planning, requirements, agendas, and meeting minutes shall be in accordance with Exhibit 5 - Workshop and Meeting Requirements.
3.3.2 DESIGN PHASE WORKSHOPS
A. The focus of workshops is to review project progress to date and the technical decisions that have been made in focused meetings. CONSULTANT shall conduct the workshops listed below in Phase 3 – Design. The CONSULTANT shall allow the following time for each workshop:
DESIGN PHASE WORKSHOPS WORKSHOP TYPE DURATION Design Kickoff Workshop 2 hours
Design Review Meetings 2 hours
Design Validation Meetings 4 hours
B. The following Design Review Meetings shall include the following topics, as
applicable to the project:
1. Civil/Yard
2. Construction
C. A single workshop shall be provided for the Design Review Meetings
D. During final design, Review and Validation Meetings shall be held after each design submittal.
3.3.3 PRE-DS2 CONSTRUCTABILITY WORKSHOP
A. A constructability workshop shall be held prior to the DS2 submittal and shall be a three-day workshop. The constructability review is intended to provide OC SAN with an objective third-party review of the Bid Documents for effectiveness in communicating information to prospective bidders. The review shall determine if the Bid Documents
3.3
02-11-2022 Project No. 1-23 – Design SOW Page 41 of 52
have sufficient information needed to bid and construct the project and avoid misunderstandings and misinterpretations that may lead to conflict, confusion or claims
during construction. This review is not a comprehensive plan check, a dimensional check or a value engineering assignment. Further, it is recognized that comments may only be given on the level of detail provided at this level of design.
B. Constructability review participants shall include highly experienced individuals from construction companies, OC SAN construction management staff and CONSULTANT construction management staff. Specialty Consultants and discipline engineers may also be included.
C. Each constructability review participant shall receive a package at least two weeks in advance. The package shall include plans and specifications, general conditions, the CPM schedule, the construction cost estimate, permits, and other pertinent information.
D. The constructability review shall be held on-site.
E. Day 1 shall start with a site visit, for the reviewers to acquaint themselves with the site conditions. After the site visit, the CONSULTANT shall make a short presentation, followed by a question-and-answer period. This is anticipated to take about 1/2 day. The second half of Day 1, Day 2, and the first half of day three shall be individual workdays for the Constructability Review Team. The CONSULTANT shall not attend, although one designated individual from the CONSULTANT’s Design Team shall
remain to answers questions and gather additional information that the constructability review team might need.
F. On the afternoon of Day 3, the CONSULTANT shall return and listen to comments
from the Constructability Review Team. A designated individual shall record the comments, and take notes from the workshop, to document the process.
G. Topics the Constructability Review Team must consider shall include:
1. Project consistency, discrepancies, and constructability issues
2. Contradictions, bid package strategies, and biddability issues
3. Size critical equipment requirements and constraints
4. Utility company requirements
5. Construction methods and mitigating impacts
6. Access for maintenance
7. Access to make proper connections
8. User-friendliness and safety
9. Coordination with other projects
10. Draft Commissioning Plan
11. Public nuisance issues
12. Risk sharing
13. Construction sequencing and schedule, materials storage and work zone accessibility
14. Clarity of the scope of work, and interface activities
15. Impacts on existing operation
02-11-2022 Project No. 1-23 – Design SOW Page 42 of 52
16. Access
17. Cost control
18. Partnering with contractor
19. Other local conditions and constraints
H. The Constructability Review Team shall provide a list of comments and the
CONSULTANT shall respond to each comment, selecting those comments to be included in the final plans and specifications.
I. To facilitate the Constructability Review Workshop, CONSULTANT shall complete the following tasks:
1. Prepare package for constructability review participants, see 3.3.3.C.
2. Prepare presentation on the project for the Constructability Review Team.
3. Meet with Constructability Review Team to receive comments.
4. Provide listing of constructability review comments and action taken on each comment. (The summary report of constructability review comments shall be prepared by the Constructability Review Team.)
J. All comments and recommendations of the workshop shall be incorporated into the Bid Documents at no additional cost to OC SAN.
3.3.4 DESIGN PHASE MEETINGS
A. Technical Progress Meetings
1. Technical Progress Meetings shall be held every four weeks for two hours to review various issues with OC SAN’s project team. A total of twenty meetings shall be held during Design Phase. The CONSULTANT shall coordinate with the
OC SAN Project Manager to determine what topics will be covered in what meetings, and what OC SAN and CONSULTANT team members are required for each.
B. Focused Meetings
1. Focused meetings shall be held throughout preliminary design to discuss specific issues in detail and generate comments and direction from OC SAN staff. Assume one-hour virtual weekly meetings unless noted otherwise. The following tentative list of topics may be covered in these meetings:
a. Site survey
b. Site meetings (traffic, site walk, public outreach, cleaning, etc.). Assume five two-hour in person meetings.
c. Site utility coordination
d. Geotechnical report
e. Quality control plan
f. Common names for facilities
g. Hydraulics and Hydraulic Modeling
h. Process Flow diagram/Operating Philosophy (several meetings as needed)
02-11-2022 Project No. 1-23 – Design SOW Page 43 of 52
i. Permits
j. Confined space and other safety requirements
k. Survey and geotechnical requirements
l. Potholing
m. Hazardous Area classification (with OC SAN Authority Having Jurisdiction
representative participating)
n. Utilities and utility tie-ins
o. Technical Definitions/equipment data sheets
p. Bypassing (several meetings as necessary)
q. Construction sequencing
r. Special studies (including sonar, noise and flow monitoring)
s. Coordination with other projects
t. Additional meetings as necessary
2. Each meeting shall generally be two-four hours in length. CONSULTANT shall determine how many meetings will be needed to cover these topics. CONSULTANT may suggest additional topics as necessary. Supplementary meetings may be scheduled with OC SAN staff, as necessary to allow coordination between the CONSULTANT and OC SAN staff.
3.3.5 CONSULTANT OFFICE TECHNICAL MEETINGS (COTMS)
A. OC SAN has found it mutually beneficial to visit the CONSULTANT offices from time to time to observe the detailed design in process, answer detailed technical questions, and establish lines of communications with CONSULTANT staff. During the Design
Phase, CONSULTANT shall arrange for OC SAN staff to meet in CONSULTANT’s work center and audit “over the shoulder” design reviews with CONSULTANT’s staff. The reviews will be monitored by a member of CONSULTANT’s Management Team.
Signification decisions will be reported to Consultants Project Manager and OC SAN’s Project Manager and logged into the Decision Log. Action items will be identified.
B. The CONSULTANT shall schedule, at a minimum, the following CONSULTANT Office Technical Meetings (COTMs):
1. Two four-hour visits to review CONSULTANT Implementation of CAD standards.
2. One two-hour follow up visits for the above.
C. The CONSULTANT shall schedule each of the above COTMs and shall coordinate with OC SAN’s Project Manager to be sure the correct personnel participate in the meetings. The CONSULTANT may propose additional, eliminate, or combine COTMs as needed to support the detailed design.
D. OC SAN may also request additional “over the shoulder” design review meetings to audit the design in other areas not listed above.
3.3.6 COORDINATION WITH OTHER PROJECTS MEETINGS
A. The project shall be a complete and fully functional facility that is integrated with existing facilities and coordinated with other construction projects. CONSULTANT shall
02-11-2022 Project No. 1-23 – Design SOW Page 44 of 52
coordinate potential conflicts with the following adjacent projects and participate in the number of meetings indicated in the following table:
PROJECT COORDINATION MEETINGS
PROJECT PROJECT DESCRIPTION COORDINATION MEETINGS
P1-105 Headworks Rehabilitation at Plant 1 2 meetings @ 1 hour
1-24 Greenville Sub-Trunk
Improvements 2 meetings @ 2 hours
FE19-04 Sunflower Pump Replacement at Plant 1 1 meeting @ 1 hour
One Metro West 15-acre mixed-use community development north of the 405 freeway in Costa Mesa.
2 meetings @ 1 hour
3.3.7 SAFETY AND RISK MEETING
A. One two-hour meeting with OC SAN Safety and Risk Management personnel between DS2 and DS3 to review the plans and specifications in accordance with OC
SAN safety policies and OC SAN Risk Management goals.
3.3.8 CONSTRUCTION SUBMITTAL ITEMS LIST MEETING
A. One two hour meeting with OC SAN between DS2 and DS3 to review the CONSULTANT’s approach to developing the project Construction Submittal Items List using the CONSULTANT-provided specifications and discuss the grouping of submittals in commissioning packages and phases. One two-hour meeting with OC SAN between DS3 and FDS to review the Construction Submittal Items List.
3.3.9 STORMWATER COMPLIANCE MEETING
A. A formal one-hour meeting shall be held with OC SAN’s stormwater compliance staff to review the project scope and identify all issues during and after construction affecting compliance with stormwater regulatory requirements and OC SAN’s policies and practices.
BID PHASE SUPPORT SERVICES
3.4.1 BID PHASE SUPPORT SERVICES
A. CONSULTANT shall provide the following bid period services:
1. Participate in the pre-bid meeting.
2. Prepare project drawing set and project specification addenda to provide clarification and resolve errors and omissions identified prior to bid opening.
3.4.2 BID EVALUATION ASSISTANCE
A. Participate in reviewing alternate equipment proposals from the Contractor, if applicable.
3.4
02-11-2022 Project No. 1-23 – Design SOW Page 45 of 52
B. Participate in the evaluation of the submitted bids, furnish consultation and advice to OC SAN staff and assist with all the related equipment, cost, and other analyses as
required to finalize the award decision.
02-11-2022 Project No. 1-23 – Design SOW Page 46 of 52
3.4.3 CONFORMED DOCUMENT PREPARATION
A. Within four weeks of the bid date, prepare conformed documents set (drawings,
databases, specifications, and other required materials) that incorporates the addenda. See Engineering Design Guidelines, Chapter 01, Design Guidelines – General Requirements, Section 01.4 “Preparation of Project Deliverables” for requirements as
modified in Section V of this Scope of Work, “Project-Specific Deviations from OC SAN Design Guidelines” and the requirements of the CAD Manual).
4. PHASE 4 – CONSTRUCTION AND INSTALLATION SERVICES
Not in this Scope of Work.
5. PHASE 5 – COMMISSIONING SERVICES
Not in this Scope of Work.
6. PHASE 6 – CLOSE OUT
Not in this Scope of Work.
7. GENERAL REQUIREMENTS
GENERAL
7.0.1 OC SAN ENGINEERING DESIGN GUIDELINES AND STRATEGIC PLAN
A. CONSULTANT shall refer to and adhere to the requirements of OC SAN Contractor
Safety Standards, OC SAN Engineering Design Guidelines, any deviations to the Engineering Design Guidelines listed below, and other OC SAN’s Design Standards referenced therein. Exhibit 16 - Spec Review using Microsoft Word and Teams
B. Exhibit 17 - OC SAN Engineering Design Guidelines and Standards – Available online at https://www.ocsd.com/about-us/transparency/document-central/-folder-917 is a complete set of the OC SAN Contractor Safety Standards and OC SAN Design Standards, the latest edition at the time of the design proposal stage.
C. The Engineering Guidelines define what plant design concepts/tools/methods and project management requirements shall be adhered to and in what manner they shall be used/provided by Consultants, e.g., requirements regarding design concepts, submittals, documentation details, use of OC SAN Master Specifications, and other related OC SAN Standards, etc.
D. Refer also to Section “CONSULTANT’s Responsibilities” in OC SAN Engineering Design Guidelines Chapter 01. Refer to “Master Specifications Instructions for Use” that mandates rules and conventions to be used in all OC SAN project specifications.
E. The project Scope of Work defines whether or not each specific deliverable described in the Guidelines shall be part of the project and when each task shall take
place.
F. The project Scope of Work also includes requirements that supplement and/or modify the Guidelines requirements for this project.
G. The project Scope of Work and OC SAN Engineering Design Guidelines impact CONSULTANT’s project cost.
7.0
02-11-2022 Project No. 1-23 – Design SOW Page 47 of 52
H. Except as specified in this Scope of Work, design of all facilities shall conform to the recommendations of the currently approved Master Plan for OC SAN facilities. The
project shall also incorporate all applicable mitigation measures included in associated environmental documents and site-specific local requirements.
I. In addition, OC SAN will require the CONSULTANT to follow subsequent revisions
of OC SAN Contractor Safety Standards, OC SAN Engineering Design Guidelines and other OC SAN Design Standards up to transmittal by OC SAN of comments on Design Submittal 2, shall be incorporated into the Design by CONSULTANT with no increase in CONSULTANT’s Not-to-Exceed upper limit on fees.
J. OC SAN may update OC SAN’s Master Specifications and/or add new OC SAN Master Specifications up to transmittal by OC SAN of comments on Design Submittal 2. The CONSULTANT shall utilize the new and/or modified Master Specifications for the DS3 submittal.
K. The CONSULTANT shall not begin editing the project specifications until the project team meets with OC SAN’s Design Standards Custodian to discuss and receive comments regarding the CONSULTANT’s proposed list of project specifications (assume two hours). This meeting will be used to determine which specifications are to use OC SAN’s master specifications, and where other sources will be utilized.
7.0.2 PROJECT PHASES AND TASKS
A. Project tasks and deliverables shall include the requirements described in this Scope of Work. CONSULTANT shall also refer to Appendix A of OC SAN Engineering Design Guidelines for the level of detail requirements for individual deliverables in each
Phase of the project not covered in the Scope of Work.
7.0.3 CONSTRUCTION SEQUENCING AND CONSTRAINTS
A. CONSULTANT shall develop with OC SAN staff and include in the Bid Documents
detailed requirements for construction sequencing and constraints. These shall ensure safe and reliable operation and maintenance of OC SAN facilities. The facilities must be kept on-line and fully operational with minimal interruptions throughout construction.
B. Meetings with OC SAN staff shall be scheduled from Monday through Thursday between the hours of 8:00 AM and 4:00 PM. Any CONSULTANT staff working on-site shall conform to OC SAN work schedules. CONSULTANT shall refer to the Engineering Design Guidelines, Chapter 01, Section 01.3.5 “CONSULTANT Inspection of Treatment Facilities” for further requirements.
7.0.4 STANDARD DRAWINGS AND TYPICAL DETAILS
A. All the details used in the project (OC SAN’s Standard Drawings, City or Agency Standard Drawings, and CONSULTANT-developed typical details) shall be shown on
the Plans.
7.0.5 SOFTWARE
A. The CONSULTANT is expected to develop and provide the deliverables using the
standard software currently approved for use by OC SAN. The standard OC SAN software includes, but is not limited to, the following:
1. Windows Professional
2. Esri software (fGDB, pGDB or shapefile formats)
3. Microsoft Internet Explorer
--
02-11-2022 Project No. 1-23 – Design SOW Page 48 of 52
4. Autodesk software (AutoCAD, AutoCAD Map3D or compatible dwg file format)
5. Microsoft Office, including MS Teams
6. Maximo
7. Bluebeam Revu eXtreme
8. Primavera P6 for scheduling
9. Innovyze ICM Hydraulic Model
10. Database software as defined elsewhere in the project Scope of Work
B. Any software that the CONSULTANT needs to comply with these standards shall be purchased and maintained by the CONSULTANT at no additional cost to OC SAN. In the event OC SAN provides the CONSULTANT with access to OC SAN software and hardware at an OC SAN facility in order to facilitate performance of their work, all software shall remain the property of OC SAN. Only software licensed to OC SAN shall be installed on OC SAN equipment. In addition, only OC SAN IT Department staff will perform the installation of this software.
7.0.6 SUBMITTAL REVIEW USING BLUEBEAM
A. OC SAN has standardized on the use of Bluebeam Revu for reviewing and providing comments to PDF files. PDF files will be hosted in a Bluebeam cloud-based studio session for review. See Exhibit 15 - Bluebeam Designer User Training for a
detailed explanation on how Bluebeam will be used to provide, validate, and close submittal review comments.
B. Prior to submitting electronic PDF files, format them as indicated in Exhibit 14 - Bluebeam Designer Training for Submission and “OC SAN CAD Standards Manual” prior to submission.
C. A one-hour training session on the use of Bluebeam and custom status menu will be
provided by OC SAN. All Consultant team members responsible for quality control and reconciliation of submittal comments shall attend.
7.0.7 WORD TRACK CHANGES
A. Specifications documents and other MS-Word based deliverables will be hosted in OC SAN Teams environment for review. The guidelines for reviewing and commenting on MS-Word files, including Specifications reviews, can be found in Exhibit 16 - Spec Review using Microsoft Word and Teams.
7.0.8 GIS SUBMITTALS
A. Consultant shall provide the following GIS deliverables propagated from approved design submittals after the design submittal is accepted. These GIS submittals will not be reviewed or presented by Consultant. The purpose is to provide project specific GIS
layers that could be used to visualize interproject dependencies and conflicts.
1. Electronic Submittal
a. Kmz files for use with Google Earth
2. Final PDR
a. Single project boundary (Polygon)
02-11-2022 Project No. 1-23 – Design SOW Page 49 of 52
(1) Boundary to encompass all new facilities and existing to be modified including:
• Buildings\Structures
• Tunnels
• Utilities
• Pavement
• Street boundary (ROW to ROW) of possible alignment
b. Structures (Polygon)
• New structure outline
• Additions to existing structures
• Structure label
3. DS1
a. Project boundary - updated from PDR
b. Structures - updated from PDR
c. Utilities (Polyline)
(1) Utility alignment
d. Manholes (Point)
e. Excavation of pits (Polygon)
(1) Pits that will stay open for extended duration
(2) CIPP
(3) Tunnel - jacking and receiving
(4) All pits should be labeled
4. DS2, DS3, and FDS
a. Project boundary - updated from previous DS
b. Structures - updated from previous DS
c. Utilities - updated from previous DS
d. Manholes - updated from previous DS
e. Excavation of pits - updated from previous DS
f. Critical (as defined by Dig Alert) utility crossings (Point)
(1) Crossing of Dig Alert critical utilities
(2) Critical utility label
• Natural gas
• Fuel pipeline
• 12 kV Electrical
g. Asphalt (Polygon)
(1) Asphalt to be replaced
02-11-2022 Project No. 1-23 – Design SOW Page 50 of 52
7.0.9 PMWEB PROCEDURES
A. This Agreement shall utilize PMWeb as the Project Control Management System
(PCMS) for overall management of the Agreement. All PCMS related documents requiring formal signatures shall be digital, and all copies digitally distributed. The PCMS conforms to the requirements set forth in California Government Code section
16.5 regarding digital signatures; therefore, digital signatures are in full force and effect and are legally the same as a hand-written signature. At least one PCMS account shall have the authority to approve Amendments.
B. OC SAN shall maintain the PCMS and serve as the administrator for the duration of this Agreement. OC SAN will provide the CONSULTANT with user access for approved personnel as needed for the duration of the Agreement. OC SAN shall control access to the PCMS by assigning user profiles and login credentials. Notify OC San of any changes to personnel. Access modifications shall be coordinated as needed throughout the Agreement. Do not to share PCMS account passwords with anyone inside or outside of the company.
C. Routine maintenance of the PCMS system may be required during the Agreement. Access to the PCMS system may be restricted or unavailable at these times and will be scheduled outside of typical working hours whenever possible.
D. The PCMS is a web-based environment and is therefore subject to the inherent
speed and connectivity problems of the Internet. The CONSULTANT is responsible for its own connectivity to the Internet. PCMS response time is dependent on the CONSULTANT’s equipment, including processor speed, Internet access speed,
Internet traffic, etc.
E. OC SAN will not be liable for any delays associated with the utilization of the PCMS including, but not limited to: slow response time, down time periods, connectivity
problems, or loss of information.
F. The OC SAN will provide a one-time free training session of up to two (2) hours to train CONSULTANT’s designated staff on general system requirements, procedures, and methods.
G. Automated system notifications generated via PCMS (e.g. in-system notices, system generated email, or email with attachment) shall constitute a formal written notification in compliance with the Professional Design Service Agreement (PDSA).
8. PROJECT-SPECIFIC DEVIATIONS FROM OC SAN DESIGN
GUIDELINES (NOT USED)
9. STAFF ASSISTANCE
OC SAN staff member or designee assigned to work with CONSULTANT on the design of this project is Victoria Pilko at (714) 454-4192, e-mail to: vpilko@ocsan.gov.
10. EXHIBITS
Exhibit 1 - Preliminary Design Report Requirements
Exhibit 2 - Design Requirements
Exhibit 3 - Project Management Requirements
02-11-2022 Project No. 1-23 – Design SOW Page 51 of 52
Exhibit 4 - Risk Management Requirements
Exhibit 5 - Workshop and Meeting Requirements
Exhibit 6 - Quality Control Requirements
Exhibit 7 - Design Submittal Requirements Matrix
Exhibit 8 - Project Schedule Calculation
Exhibit 9 - Deliverables Quantities
Exhibit 10 - Sample Construction Cost Estimate Format
Exhibit 11 - Sample Full Project Safety Review Plan
Exhibit 12 - Sample Risk Management Check List
Exhibit 13 - MMRP Log Template
Exhibit 14 - Bluebeam Designer Training for Submission
Exhibit 15 - Bluebeam Designer User Training
Exhibit 16 - Spec Review using Microsoft Word and Teams
Exhibit 17 - OC SAN Engineering Design Guidelines and Standards – Available online at https://www.ocsd.com/about-us/transparency/document-central/-folder-917
Exhibit 18 – Overall Project Map
Exhibit 19 - Project Reference Material
19.A. Project No. 1-1 Record Drawings
19.B. Project No. 1-1-A Record Drawings
19.C. Project No. 1-15R Record Drawings
19.D. Project No. 14-1-1A-2 and 1-16 Record Drawings
19.E. Project No. 1-17 Record Drawings
19.F. Project No. 1-17 TM 1 – Design Parameters
19.G. Project No. 1-17 TM 2 – Record Investigation and Easement
Documents
19.H. Project No. 1-17 TM 3 – Hydraulic Modeling
19.I. Project No. 1-17 TM 4 – Odor Monitoring and Mitigation
19.J. Project No. 1-17 TM 5 – Manhole and Pipeline Inspections and
Condition Assessment
19.K. Project No. 1-17 TM 6 – Planning Level Rehabilitation
Recommendation
19.L. Project No. 1-17 Preliminary Geotechnical Evaluation
19.M. Manhole CCTV Reports (2021)
19.N. Pipeline CCTV Reports (2021)
19.O. Condition Assessment Report for Santa Ana Trunk Line Between
Manholes SAN0140 and SAN0190 (2020)
19.P. Corrosion Assessment Summary Report SAN0045 to SAN0110
(2019)
19.Q. Santa Ana Trunk Sewer Inspection Report (2002)
02-11-2022 Project No. 1-23 – Design SOW Page 52 of 52
19.R. Talbert Trunk Line – Rights Analysis
19.S. Connection Permits
Exhibit 20 - NOT USED
Exhibit 21 - NOT USED
Exhibit 22 - NOT USED
Exhibit 23 - NOT USED
Exhibit 24 - NOT USED
Exhibit 25 - NOT USED
Exhibit 26 - NOT USED
Exhibit 27 - NOT USED
Exhibit 28 - NOT USED
CF:VP:dm
3/29/2022
1
Presented by:
Marianne Kleine
Engineering
Supervisor
Operations
Committee
April 6, 2022
Santa Ana Trunk Sewer Rehabilitation
Project No. 1‐23
Consultant Award
2
Project Location:
Cities of Costa Mesa and Santa Ana
Costa Mesa
Santa Ana
Alton Ave
Fa
i
r
v
i
e
w
St
Br
i
s
t
o
l
St
Ha
r
b
o
r
Bl
v
d
MacArthur Blvd
Sunflower Ave
Project No. 1‐23
Santa Ana Trunk
1
2
3/29/2022
2
•Built in the early 1950s
•Severe deterioration:
•Exposed aggregate and reinforcement steel
•Infiltration
•Liner and coating delamination
What is the Problem?
42” at SAN0155-0000 2020
3
Liner peeling off at SAN0145‐0000
4
What is the Solution?
Water or Steam
•Cured‐in‐place Pipe
Rehabilitation (CIPP)
•Manhole Rehabilitation
3
4
Refrigerated
Truck
3/29/2022
3
5
•Four proposals received
•Interviews conducted with top two firms
•Stantec Consulting Services, Inc. selected
•Clear project understanding
•Experienced Project Team
•Detailed implementation plan to meet project goalsSelection
Process
6
Negotiations
Original Proposal Negotiated
Total Hours 15,425 17,211
Total Fee $3,667,767 $3,880,000
•Clarified scope of work and design assumptions
•Added 28 drawings (bypass, pavement restoration,
details)
•Ensured proper scope and level of effort are appropriate
for the work
5
6
3/29/2022
4
7
Recommend to the Board of Directors to:
A. Approve a Professional Design Services
Agreement with Stantec Consulting Services, Inc.
to provide engineering services for Santa Ana
Trunk Sewer Rehabilitation, Project No. 1‐23, for
an amount not to exceed $3,880,000; and
B. Approve a contingency of $388,000 (10%).
Recommendation
Questions
?
8
7
8
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2022-2070 Agenda Date:4/6/2022 Agenda Item No:6.
FROM:James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
SUPPLEMENTAL ENGINEERING SERVICES, CONTRACT NO. PSA2021-002
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Recommend to the Board of Directors to:
Approve Professional Services Agreements to provide Supplemental Engineering Services, Contract
No. PSA2021-002, for a three-year period commencing May 1, 2022, through April 30, 2025, with two
one-year renewal options, for an amount not to exceed $29,700,000 per individual agreement with
the following two firms:
·AECOM Technical Services, Inc.
·Jacobs Project Management Co.
BACKGROUND
Orange County Sanitation District’s (OC San’s) Engineering Department includes 99 full time staff in
a variety of engineering, inspection, administrative, and engineering support roles, plus 13
supervisors, four managers, and the Director of Engineering. The department manages the
execution of the Capital Improvement Program (CIP), as well as many of the more complex repair
projects. Using its project controls staff and program management tools, the Engineering
Department forecasts staffing levels over the next 20 years to deliver the program.
To ensure that projects are completed on time and properly controlled, OC San has been utilizing
supplemental engineering services agreements. The benefits of this approach, as opposed to hiring
full-time staff or limited-term employees, include the ability to adjust staffing levels for a variety of
disciplines from month-to-month and year-to-year, access to certain engineering disciplines,
specialists, and technical experts needed only intermittently, and rapid mobilization of highly skilled
technical resources for third party reviews such as value engineering and constructability reviews.
RELEVANT STANDARDS
·Ensure the public’s money is wisely spent
·Sustain 1, 5, 20-year planning horizons
·California Government Code §4526: Select the “best qualified firm” and “negotiate fair and
Orange County Sanitation District Printed on 3/29/2022Page 1 of 4
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
File #:2022-2070 Agenda Date:4/6/2022 Agenda Item No:6.
equitable fees”
PROBLEM
OC San anticipates a $1.5 billion CIP from July 2022 through June 2027.
Although staff intends to request additional positions in the proposed Fiscal Year 2022-23 and 2023-
24 budget, the projected workload will still exceed the number of staff.
The current supplemental engineering support agreement with Jacobs Project Management Co.
started in July 2016 and may be extended no later than June 2023.A similar agreement with Jacobs
Project Management was in effect between May 2012 and June 2016.
PROPOSED SOLUTION
Approve two Professional Services Agreements to provide Supplemental Engineering Services for up
to a five-year period ending in April 2027.
When OC San identifies the need for supplemental professional resources,whether to complete a
specific task or fill a project or program role,the two firms will be requested to propose appropriately
qualified staff.OC San will then determine the most appropriate team for the assignment,and either
authorize the person or persons to fill the project role or negotiate the budget and schedule for the
task.
Staff will provide quarterly reports to the Board of Directors on the utilization of the Supplemental
Engineering Services contracts.
TIMING CONCERNS
Although the existing Supplemental Engineering Services agreement with Jacobs could be
terminated in June 2022,an overlapping period between the existing contract and the new contracts
will allow existing assignments to either be completed in the coming year or migrated through a
phased approach before the existing contract expires.
RAMIFICATIONS OF NOT TAKING ACTION
Without the necessary engineering resources,projects will have to be delayed,and certain specialty
services will need to be separately procured as needed,resulting in delays and additional
administrative costs.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
Orange County Sanitation District Printed on 3/29/2022Page 2 of 4
powered by Legistar™
File #:2022-2070 Agenda Date:4/6/2022 Agenda Item No:6.
ADDITIONAL INFORMATION
Consultant Selection:
OC San requested and advertised for proposals for Supplemental Engineering Services,Contract
No.PSA2021-002,on September 21,2021.The following evaluation criteria were described in the
Request for Proposals and used to determine the most qualified Consultant.
CRITERION WEIGHT
Project Understanding and Approach 25%
Related Project Experience 40%
Project Team and Staff Qualifications 35%
Three proposals were received on November 17,2021 and evaluated in accordance with the
evaluation process set forth in OC San’s Purchasing Ordinance by a pre-selected Evaluation Team
consisting of OC San staff:three Engineering Managers,one Engineering Supervisor,and one
Construction Inspection Supervisor.The Evaluation Team also included one non-voting representative
from the Contracts Administration Division.
The Evaluation Team scored the proposal on the established criteria as summarized in the table
below:
Firm Approach (Max 25)Related
Experience
(Max 40)
Team (Max
35)
Total Score
(Max 100)
1 Jacobs Project
Management Co.
24 38 32 94
2 AECOM Technical
Services
19 29 25 73
3 WSP USA, Inc.16 26 20 62
Based on this scoring,all three Consultants were shortlisted for interviews on December 16,2021.
Following the interviews,each member of the Evaluation Team scored the Consultants based on
both the proposals and interviews using the evaluation criteria and weighting described above.
Based on the scoring shown below,Jacobs Project Management Co.and AECOM Technical
Services were selected as the most qualified Consultants.
Firm Approach (Max 25)Related
Experience
(Max 40)
Team (Max
35)
Total Score
(Max 100)
1 Jacobs Project
Management Co.
25 38 32 95
2 AECOM Technical
Services
19 30 27 76
3 WSP USA, Inc.14 21 19 54
Orange County Sanitation District Printed on 3/29/2022Page 3 of 4
powered by Legistar™
File #:2022-2070 Agenda Date:4/6/2022 Agenda Item No:6.
Jacobs Project Management Co.demonstrated a very impressive pool of professionals experienced
in the type of work required and presented an approach for managing resource requests and
supervising resources which has proven highly effective in the existing Supplemental Engineering
Services agreement.AECOM Technical Services documented a deep bench of professionals with
relevant experience,demonstrated experience with similar agreements with other agencies,and
provided a good approach to supervising on-site staff.
Review of Fee Proposal and Negotiations:
Proposals were accompanied by sealed fee proposals.In accordance with OC San’s Purchasing
Ordinance,the fee proposals of only the two highest-ranked firms were opened after approval by the
Director of Engineering of the Evaluation Committee’s recommendation.
Staff conducted negotiations with Jacobs Project Management Co.and AECOM Technical Services
to confirm fringe and overhead rates and resolve payment terms, insurance, and indemnification.
The Consultant’s fringe and overhead costs,which factor into the billing rate,have been
substantiated.The contract profit is 5.0%,which is based on an established formula based on OC
San’s standard design agreements.Based on this,staff has determined that the final negotiated
payment terms are fair and reasonable and recommends award of the Professional Services
Agreements to Jacobs Project Management Co. and AECOM Technical Services.
Contract Value:
Staff has estimated that,on average,the equivalent of 32 full time staff will be required over the
maximum 5-year period of these contracts.Assignments will be made on a case-by-case basis,so
fees earned by one firm could be more than the other firm.For this reason,staff is proposing the
contract limit for each firm be approximately 60 percent of the total expected fees associated with the
32 full-time equivalents.
CEQA
N/A
FINANCIAL CONSIDERATIONS
This request complies with authority levels of OC San’s Purchasing Ordinance.The budgeted cost
for the proposed Professional Service Agreements is contained within the approved CIP project
budgets and no additional funding is necessary.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Professional Services Agreement
·Presentation
JM:DF:jw
Orange County Sanitation District Printed on 3/29/2022Page 4 of 4
powered by Legistar™
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 1 of 19
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT, is made and entered into to be effective the 1st day of May, 2022,
by and between the ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to as "OC SAN", and AECOM TECHNICAL SERVICES, INC., for purposes of this AGREEMENT hereinafter referred to as "CONSULTANT". OC SAN and CONSULTANT are referred to herein collectively as the "Parties" or individually as a "Party." WITNESSETH: WHEREAS, OC SAN desires to engage a consultant for Supplemental Engineering Services, PSA2021-002-1, to provide qualified staff as described in Attachment “A”, Scope of Work; and Attachment “A1”, Rules of Engagement, and, WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the requisite personnel and experience, and is capable of performing such services; and,
WHEREAS, OC SAN has adopted procedures for the selection of professional services and has proceeded in accordance with said procedures to select a CONSULTANT to perform
this work; and, WHEREAS, OC SAN shall manage selection of a Consultant for Task Order(s) when
requested after award of this AGREEMENT based on the most appropriate qualifications and fit; and, WHEREAS, at its regular meeting on April 27, 2022 the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee to approve this AGREEMENT between OC SAN and CONSULTANT. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this AGREEMENT, it is mutually agreed as follows:
1. SCOPE OF WORK
CONSULTANT agrees to furnish necessary professional services to accomplish the Scope of Work attached hereto as "Attachment A". Attachment “A” is hereby incorporated into this AGREEMENT. In the event of a conflict between the Scope of
Work and this AGREEMENT, the terms of this AGREEMENT shall prevail.
2. COMPENSATION Total compensation shall be paid to CONSULTANT for services in accordance with the following provisions:
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 2 of 19
A. Time and Material: Not to Exceed Aggregate Amount
OC SAN shall compensate CONSULTANT for services performed under this AGREEMENT on a time and materials basis, not to exceed a maximum aggregate amount of Twenty-Nine Million Seven Hundred Thousand Dollars
($29,700,000) (“Total Compensation”) during the term of the AGREEMENT.
B. Hourly Rates As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus
benefits, overhead, and profit) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT per Attachment “E”. OC SAN shall also pay to CONSULTANT a sum equal to the premium costs for overtime, charged on an hourly-rate basis, actually paid by CONSULTANT to the non-exempt personnel of CONSULTANT plus profit. Premium costs for overtime will not include fringe and overhead. Attachment “E” is hereby incorporated by reference. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this AGREEMENT.
C. Overhead i. “Field Staff” are defined as project-assigned staff by CONSULTANT, working at OC SAN’s facilities for a project-assigned period exceeding ninety (90) continuous calendar days. The overhead rates for Field Office Staff are included in Attachment “E”. ii. “Home Office Staff” are defined as staff assigned by CONSULTANT,
supporting the project-assigned work, either by working at CONSULTANT’s or Subconsultant’s offices or at OC SAN’s site for periods less than ninety (90) continuous calendar days. The overhead rates for Home Office Staff
are included in Attachment “E”.
D. Profit
Profit for CONSULTANT and Subconsultants shall be five percent (5%). Addenda shall be governed by the same maximum Profit percentage. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this AGREEMENT.
E. Subconsultants
For all Subconsultants, CONSULTANT may pay to Subconsultants total compensation on an hourly-rate basis per Attachment “E” – Fee Proposal and as specified in the Scope of Work. The SANITATION DISTRICT shall pay to
CONSULTANT the actual costs of Subconsultants, without markup.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 3 of 19
F. Escalation
For purposes of calculating hourly billing rates of CONSULTANT employees and
any Subconsultant employees performing services under this AGREEMENT, the Maximum Hourly Rate as defined in Attachment “E” shall be adjusted annually based on the Employment Cost Index (ECI) of Los Angeles-Long Beach-
Anaheim, California as of July 1 of each year. This rate is from the United States Department of Labor Bureau of Labor Statistics. The annual adjustments shall not exceed three percent (3%). The first hourly rate escalation will occur July 1, 2023.
G. Reimbursable Direct Costs
OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this AGREEMENT. The reimbursement of the above mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts and a “per diem” component approved by
IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at http://www.gsa.gov/portal/category/104711#. The CONSULTANT shall be responsible for the most economical and practical means or management of reimbursable costs inclusive but not limited to travel,
lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN. Travel and travel arrangements – Any travel involving airfare, overnight stays or
multiple day attendance must be approved by OC SAN in advance. Local Travel is considered travel by the CONSULTANT within OC SAN
geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel. Lodging – Overnight stays will not be approved by OC SAN for local travel.
However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN. Travel Meals – Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 4 of 19
Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this AGREEMENT.
OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN.
OC SAN will not pay per diem for Field Office Staff nor will it pay for any relocation of staff to be assigned under this AGREEMENT.
H. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services described in any of CONSULTANT’s Task Authorizations will exceed seventy-five percent (75%) of the not-to-exceed amount of the Task Authorization, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the
express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s
invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this AGREEMENT.
3. REALLOCATION OF TOTAL COMPENSATION
OC SAN, by its Director of Engineering, shall have the right to approve a reallocation of the incremental amounts constituting the Total Compensation, provided that the Total Compensation is not increased.
4. KEY POSITIONS
CONSULTANT shall notify OC SAN in advance changes to any key CONSULTANT employees performing services under this AGREEMENT. Positions considered to be Key Positions are Point of Contact, and any field office staff working under the AGREEMENT.
Should a CONSULTANT employee within one of these categories become no longer available to OC SAN, CONSULTANT shall submit the resume and qualifications of the proposed replacement to OC SAN for approval as soon as possible, but in no event later
than seven (7) calendar days prior to the departure of the incumbent Key Position unless CONSULTANT is not provided with such notice by the departing staff.
5. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period, in a format acceptable to OC SAN. CONSULTANT shall warrant and certify the accuracy of these costs and provide all support documentation required by OC SAN. CONSULTANT understands that submitted costs are subject to Section 16 Audit Provisions.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 5 of 19
B. Upon receipt of a properly prepared invoice, as described above, payment shall be made by OC SAN to CONSULTANT within sixty (60) calendar days.
C. Upon satisfactory completion of the work performed hereunder and prior to final payment under this AGREEMENT for such work, or prior settlement upon termination of this AGREEMENT, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this AGREEMENT other than such claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein.
D. Pursuant to the California False Claims Act (Government Code sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this AGREEMENT may be held liable for treble
damages and up to a $10,000 civil penalty for each false claim submitted. This section shall also be binding on all Subconsultants.
A CONSULTANT or Subconsultant shall be deemed to have submitted a false
claim when the CONSULTANT or Subconsultant: (a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by OC SAN; (c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; (d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or (e) is a beneficiary of an inadvertent submission of a false claim to OC SAN,
and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim.
6. TERM
This AGREEMENT shall commence upon the effective date first written above, and shall continue in full force and effect through April 30, 2025, (“Initial Term”) unless earlier terminated or extended as provided in the AGREEMENT. OC SAN, at its sole discretion,
may elect to extend the term of this AGREEMENT up to an additional twelve (12) months, commencing May 1, 2025, and continuing through April 30, 2026, (“Option Term 1”), and thereupon require CONSULTANT to continue to provide services, and otherwise
perform, in accordance with Attachment “A”, entitled “Scope of Work” and Attachment “A1”, entitled “Rules of Engagement”.
OC SAN, at its sole discretion, may elect to extend the term of this AGREEMENT up to an additional twelve (12) months, commencing May 1, 2026, and continuing through April 30, 2027, (“Option Term 2”), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A”, entitled “Scope of Work”, and Attachment “A1”, entitled “Rules of Engagement”.
OC SAN’s election to extend the AGREEMENT beyond the Initial Term shall not diminish its right to terminate the AGREEMENT for OC SAN’s convenience or CONSULTANT’s default as provided elsewhere in this AGREEMENT. The “maximum term” of this AGREEMENT shall be from the effective date first written above through
April 30, 2027, which period encompasses the Initial Term and two (2) Option Terms.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 6 of 19
7. PREVAILING WAGES
To the extent CONSULTANT intends to utilize employees who will perform work during
the AGREEMENT, as more specifically defined under Labor Code Section 1720, CONSULTANT shall be subject to prevailing wage requirements with respect to such employees.
8. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES
A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform Work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR
and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section
1771.4, the Work is subject to compliance monitoring and enforcement by the DIR.
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776.
C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants
shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the
Department of Industrial Relations.
D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e).
9. CONFLICT OF INTEREST CODE
OC SAN may designate some or all of the individuals performing services under the AGREEMENT as “designated positions” subject to OC SAN’s Conflict of Interest Code. Consultant employees acting in these designated positions must comply with certain
requirements under the Political Reform Act. Consultant employees acting in these designated positions must file an annual report identifying some or all of their financial interests such as sources of income, sources of gifts received from special sources of
income and sources of gifts. Currently the limit is $520 per year from any one source. CONSULTANT and all its employees, staff, or personnel assigned to an OC SAN designated position shall comply with the Political Reform Act and related reporting
requirements and gift limitation.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 7 of 19
10. INDEPENDENT CONTRACTOR
The CONSULTANT and Subconsultants shall be independent contractors and not
agents of OC SAN. Any provisions of this AGREEMENT that may appear to give OC SAN the right to direct the CONSULTANT concerning the details of performing the professional services, or to exercise any control over such performance, shall mean only
that the CONSULTANT shall follow the direction of OC SAN concerning the end results of the performance.
11. DOCUMENT OWNERSHIP – CONSULTANT PERFORMANCE
A. Ownership of Documents for the Professional Services performed.
All documents in all forms (electronic, paper, etc.), including, but not limited to,
studies, sketches, drawings, computer printouts, disk files, and electronic copies prepared in connection with or related to the Scope of Work or Professional Services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed. OC SAN ownership entitlement arises upon payment or any partial payment for
work performed and includes ownership of any and all work product completed prior to that payment. This Section shall apply whether the CONSULTANT’s Professional Services are terminated: a) by the completion of the AGREEMENT, or b) in accordance with other provisions of this AGREEMENT. Notwithstanding any other provision of this paragraph or AGREEMENT, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer printouts and disk files, and specifications. OC SAN acknowledges that documents prepared through Professional Services must be revised and sealed by a professional engineer prior to their reuse on another project. OC SAN acknowledges that it assumes all risk associated with reuse of such documents, which are not undertaken by CONSULTANT.
B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the study or deliverable where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service
rendered by CONSULTANT was not a proximate cause of the damage.
12. INSURANCE
A. General i. Insurance shall be issued and underwritten by insurance companies acceptable to OC SAN. ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Worker’s
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 8 of 19
Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below
“B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to
CONSULTANT, by OC SAN or its agent. iii. Coverage shall be in effect prior to the commencement of any work under this AGREEMENT. B. General Liability The CONSULTANT shall maintain during the life of this AGREEMENT, including the period of warranty, Commercial General Liability Insurance written on an occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four
Million Dollars ($4,000,000) aggregate. If aggregate limits apply separately to this contract (as evidenced by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said
insurance shall include coverage for the following hazards: Premises-Operations, blanket contractual liability (for this AGREEMENT), products liability/completed operations (including any product manufactured or
assembled), broad form property damage, blanket contractual liability, independent contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) and Riggers/On Hook Liability must be included in the General Liability policy and coverage must be reflected on the submitted Certificate of Insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of
coverage, or any other reason against OC SAN, its or their officers, agents, or employees, and any other consultant, contractor or subcontractor performing work or rendering services on behalf of OC SAN in connection with the
planning, development and construction of the project. In all its insurance coverages related to the work, CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against
OC SAN, its or their officers, agents, or employees, or any other consultant, contractor or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 9 of 19
C. Umbrella Excess Liability
The minimum limits of general liability and Automotive Liability Insurance required, as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess
coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automotive liability. D. Automotive/Vehicle liability Insurance The CONSULTANT shall maintain a policy of Automotive Liability Insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: Combined single limit of Five Hundred Thousand Dollars ($500,000). A statement on an insurance certificate will not be accepted in lieu of the actual
additional insured endorsement. E. Drone Liability Insurance
If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of One Million Dollars ($1,000,000) in a form
acceptable by OC SAN. F. Worker’s Compensation Insurance The CONSULTANT shall provide such Workers’ Compensation Insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including Employer’s Liability Insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such Worker’s Compensation Insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California
Insurance Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for
Jones Act claims. G. Errors and Omissions/Professional Liability
CONSULTANT shall maintain in full force and effect, throughout the term of this AGREEMENT, standard industry form professional negligence errors and omissions insurance coverage in an amount of not less than Five Million Dollars ($5,000,000) with limits in accordance with the provisions of this Paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this AGREEMENT, and for a period of five (5) years from the date of the completion of the services hereunder.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 10 of 19
In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of
CONSULTANT during the course of performing services under the term of this AGREEMENT. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the
present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis, said policy shall be continued in full force and effect during the term of this AGREEMENT or until completion of the services provided for in this AGREEMENT, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts of CONSULTANT during the course of performing services under the term of this AGREEMENT. CONSULTANT shall provide to OC SAN a certificate of insurance in a form
acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy, and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term.
H. Proof of Coverage
The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before work commences. OC SAN reserves the right to require complete, certified copies of all required insurance policies, including endorsements, effecting the coverage required, at any time. The following are approved forms that must be submitted as proof of coverage:
• Certificate of Insurance ACORD Form 25 or other equivalent Certificate of Insurance form.
• Additional Insurance (General Liability)
The combination of (ISO Forms) CG 2010 and CG 2037
All other Additional Insured endorsements must be submitted for approval by OC SAN, and
OC SAN may reject alternatives that provide different or less coverage to OC SAN.
• Additional Insured (Auto Liability)
Submit endorsement provided by carrier for OC SAN approval.
• Waiver of Subrogation Submit workers’ compensation waiver of subrogation endorsement provided by carrier for OC SAN approval.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 11 of 19
• Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC
SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below.
I. Cancellation and Policy Change Notice The CONSULTANT is required to notify OC SAN in writing of any insurance
cancellation notice it receives or other knowledge of pending or actual insurance
policy cancellation, within two (2) working days of receipt of such notice or
acquisition of such knowledge. Additionally, the CONSULTANT is required to
notify OC SAN in writing of any change in the terms of insurance, including
reduction in coverage or increase in deductible/SIR, within two (2) working days
of receipt of such notice or knowledge of same.
Said notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT
10844 Ellis Avenue, Fountain Valley, CA 92708
Attention: Contracts, Purchasing & Materials Management Division J. Primary Insurance The General and Automobile liability policies shall contain a Primary and Non-Contributory Clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT. K. Separation of Insured The General and Automobile liability policies shall contain a “Separation of Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this AGREEMENT, or the extent
to which CONSULTANT may be held responsible for payment of damages to persons or property.
M. Deductibles and Self-Insured Retentions Any deductible and/or self-insured retention must be declared to OC SAN on the Certificate of Insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 12 of 19
N. Defense Costs
The General and Automobile Liability policies shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not
deplete any policy limits. O. Subconsultants The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the Subconsultant’s operations and work. P. Limits Are Minimums
If the CONSULTANT maintains higher limits than any minimums shown above, then OC SAN requires and shall be entitled to coverage for the higher limits maintained by CONSULTANT.
13. SCOPE CHANGES
In the event of a change in the Scope of Work or a change in Key Personnel, or change in hourly rates, as requested by OC SAN, the Parties hereto shall execute an
Amendment to this AGREEMENT setting forth with particularity all terms of the new AGREEMENT. CONSULTANT’s compensation for additional services authorized and performed in accordance with this AGREEMENT shall be agreed to by OC SAN and CONSULTANT in writing prior to the time that the additional services are authorized. An Amendment shall be executed to document the change.
CONSULTANT hereby agrees to use any and all procedures, programs, and systems required by OC SAN to process and execute such Amendment(s), including, but not limited to, computer programs and systems.
14. PROJECT TEAM AND SUBCONSULTANTS
Neither this AGREEMENT nor any interest herein nor claim hereunder may be assigned by CONSULTANT either voluntarily or by operation of law, nor may all or any part of the
AGREEMENT be subcontracted by CONSULTANT, without the prior written consent of OC SAN. Consent by OC SAN shall not be deemed to relieve CONSULTANT of its obligation to comply fully with all terms and conditions of this AGREEMENT.
CONSULTANT shall provide to OC SAN, prior to execution of this AGREEMENT, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used under this AGREEMENT by CONSULTANT.
CONSULTANT shall include a description of the work and services to be done by each Subconsultant and each of CONSULTANT’s team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant, broken down as indicated in Section 2- COMPENSATION.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 13 of 19
There shall be no substitution of the listed Subconsultants and CONSULTANT’s team members without prior written approval by OC SAN.
15. ENGINEERING REGISTRATION
The CONSULTANT's personnel and Subconsultants are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is
not a registered engineer but represents and agrees that wherever, in the performance of this AGREEMENT, the services of a registered engineer is required, such services hereunder will be performed under the direct supervision of registered engineers who are registered in California.
16. AUDIT PROVISIONS
A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this AGREEMENT. The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all
Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be
incurred or to ensure CONSULTANT’s compliance with all requirements under this AGREEMENT during the term of this AGREEMENT and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with
generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15
days after receipt of notice from OC SAN. Upon OC SAN’s request, the CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified
employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all accounting records and documents, and any other financial data related to this AGREEMENT.
17. LEGAL RELATIONSHIP BETWEEN PARTIES
The legal relationship between the parties hereto is that of an independent contractor and nothing herein shall be deemed to transform CONSULTANT, its staff, independent contractors, or Subconsultants into employees of OC SAN. CONSULTANT’S staff performing services under the AGREEMENT shall at all times be employees and/or independent contractors of CONSULTANT. CONSULTANT shall monitor and control its staff and pay wages, salaries, and other amounts due directly to its staff in connection with the AGREEMENT. CONSULTANT shall be responsible for hiring, review, and
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 14 of 19
termination of its staff and shall be accountable for all reports and obligations respecting them, such as social security, income tax withholding, unemployment compensation,
workers’ compensation and similar matters.
To the fullest extent permitted by law, CONSULTANT shall defend and indemnify OC SAN from and against any and all claims by CONSULTANT, its principals, officers,
agents, employees, former employees, suppliers, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them for benefits provided to employees of OC SAN, including, but not limited to: worker’s compensation, unemployment compensation, participation in the Orange County Employees Retirement System, paid time off, medical insurance, dental insurance, vision insurance, life/accidental death and dismemberment insurance, disability insurance, etc. In addition, CONSULTANT shall be required to indemnify the Indemnified Parties for any costs related to such claims.
18. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of this AGREEMENT, or changes thereto, shall be effected by delivery of said notices in
person or by depositing said notices in the U.S. mail, registered or certified mail, return receipt requested, postage prepaid and addressed as follows:
ORANGE COUNTY SANITATION DISTRICT
10844 Ellis Avenue, Fountain Valley, CA 92708-7018 Attention: Diane Marzano, Senior Contracts Administrator Copy: Jeffrey Mohr, Engineering Manager
CONSULTANT: AECOM TECHNICAL SERVICES, INC. 999 Town & Country Road, Orange, CA 92868 Attention: Chris Bessa, Point of Contact All communication regarding the Scope of Work, will be addressed to the Engineering Manager. Direction from other OC SAN staff must be approved in writing by OC SAN’s Engineering Manager prior to any action by the CONSULTANT.
19. TERMINATION
OC SAN may terminate this AGREEMENT at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination, CONSULTANT shall be entitled to compensation for work performed on a prorated basis
through and including the effective date of termination.
CONSULTANT shall be permitted to terminate this AGREEMENT upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in
accordance with the provisions of this AGREEMENT, when the same are due.
Notice of termination shall be mailed to OC SAN at the address listed in Section 18 - NOTICES.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 15 of 19
20. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this AGREEMENT shall become the property of
OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, electronic materials, computation and study materials in its files pertaining to the work described in this
AGREEMENT, which is requested in writing by OC SAN.
21. COMPLIANCE
A. Labor CONSULTANT certifies by the execution of this AGREEMENT that it pays employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all federal, state and local directives
and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment.
B. Air Pollution
CONSULTANT and its subconsultants and subcontractors shall comply with all applicable federal, state and local air pollution control laws and regulations. C. Iran Contracting Act CONSULTANT and its subconsultants and subcontractors shall comply with the Iran Contracting Act of e and local air pollution control laws and regulations. (Public Contract Code sections 2200-2208).
22. AGREEMENT EXECUTION AUTHORIZATION
Both OC SAN and CONSULTANT do covenant that each individual executing this document by and on behalf of each Party). is a person duly authorized to execute this
AGREEMENT for that Party.
23. DISPUTE RESOLUTION
In the event of a dispute arising between the parties regarding performance or
interpretation of this AGREEMENT, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services.
24. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS
If any action at law or in equity or if any proceeding in the form of an Alternative Dispute
Resolution (ADR) is necessary to enforce or interpret the terms of this AGREEMENT, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which he may be entitled.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 16 of 19
25. INDEMNIFICATION To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN,
which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, CONSULTANT’s, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties, costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and
OC SAN’s general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in
carrying out its obligations under this AGREEMENT to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, CONSULTANT, Subconsultants,
subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from: (A) the active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or
(C) the independent action of a third party who is neither one of the Indemnified Parties
nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them.
Exceptions (A) through (B) above shall not apply, and CONSULTANT shall, to the fullest
extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder.
CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the provisions of this AGREEMENT. Under no circumstances shall the insurance requirements and limits set forth in this AGREEMENT be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this AGREEMENT are contractual and the result of negotiation between the parties hereto.
Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting party, shall not be employed in the interpretation of this AGREEMENT.
CONSULTANT is indemnified in OC SAN’s standard construction contracts. This indemnification is in the General Conditions which are attached to OC SAN’s standard construction contracts when these contracts are issued.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 17 of 19
26. DUTY TO DEFEND
The duty to defend hereunder is wholly independent of and separate from the duty to
indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without
regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the payment or advance of defense costs by any Indemnified Party shall not be a condition precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the Indemnified Parties against such claims.
CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this AGREEMENT until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable
statute of limitations.
27. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES
CONSULTANT shall comply with all OC SAN policies and procedures including the Contractor Safety Standards, as applicable, all of which may be amended from time to time.
28. CLOSEOUT
When OC SAN determines that all Work authorized under the AGREEMENT is fully
complete and that OC SAN requires no further work from CONSULTANT, or the AGREEMENT is otherwise terminated or expires in accordance with the terms of the AGREEMENT, OC SAN shall give the Consultant written notice that the AGREEMENT
will be closed out. CONSULTANT shall submit all outstanding billings, work submittals, deliverables, reports or similarly related documents as required under the AGREEMENT within thirty (30) days of receipt of notice of AGREEMENT closeout.
Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the AGREEMENT and will either: i. Give the CONSULTANT a final AGREEMENT Acceptance: or ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost. CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in the AGREEMENT Such support must be
provided within the timeframe requested by OC SAN.
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 18 of 19
Notwithstanding the final AGREEMENT acceptance, the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its
obligations to complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise), and the CONSULTANT shall remain obligated under all those
provisions of the AGREEMENT which expressly or by their nature extend beyond and survive final AGREEMENT Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final AGREEMENT Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or AGREEMENT with, the CONSULTANT’s request for final AGREEMENT Acceptance.
29. PROHIBITION
During the term of this AGREEMENT, CONSULTANT and its Subconsultants may not propose on any engineering or construction-related projects advertised by or on behalf of OC SAN, if such work presents actual or perceived conflict of interest with
CONSULTANT’s assignments with OC SAN.
CONSULTANT and its Subconsultants shall promptly disclose to OC SAN when such conflict exists prior to participating in any work as advertised by OC SAN or on its behalf.
CONSULTANT and its Subconsultants acknowledge and agree that OC SAN’s determination regarding such conflicts, that may impact CONSULTANT’s and its Subconsultants’ ability to propose on the work as described herein, shall be final and
cannot be appealed.
30. ENTIRE AGREEMENT
This AGREEMENT constitutes the entire understanding and AGREEMENT between the Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof.
[THIS SECTION INTENTIONALLY LEFT BLANK]
PSA PSA2021-002-1
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 19 of 19
IN WITNESS WHEREOF, this AGREEMENT has been executed in the name of OC SAN, by its officers thereunto duly authorized, and CONSULTANT as of the day and year first above
written. CONSULTANT: AECOM TECHNICAL SERVICES, INC. By __________________________________________________ Date __________________________________________________ Printed Name & Title
ORANGE COUNTY SANITATION DISTRICT
By __________________________________________________ John B. Withers Date
Board Chairman
By __________________________________________________
Kelly A. Lore Date Clerk of the Board
By __________________________________________________ Ruth Zintzun Date Purchasing & Contracts Manager Attachments: Attachment “A” – Scope of Work
Attachment “A1” – Rules of Engagement Attachment “B” – Not Used Attachment “C” – Not Used
Attachment “D” – Allowable Direct Costs Attachment “E” – Fee Proposal Attachment “F” – Not Used
Attachment “G” – Not Used Attachment “H” – Not Used Attachment “I” – Not Used Attachment “J” – Not Used Attachment “K” – Contractor Safety Standards Attachment “L” – Not Used
DM:ms
SCOPE OF WORK PSA2021-002
1505425.1
Page 1 of 10
ATTACHMENT A
SCOPE OF WORK
I. SUMMARY
Orange County Sanitation District (OC San) is a special district responsible for wastewater
conveyance and treatment for metropolitan Orange County, California. It has been in existence
since 1954 and is the third largest wastewater treatment agency west of the Mississippi River.
OC San is soliciting Proposals to provide its engineering projects, which includes large and
small capital projects and operationally funded repair projects.
II. BACKGROUND
OC San has budgeted for a 10-year $3.0 billion capital improvement program, the vast majority
of which is managed by the Engineering Department. OC San also has an active asset
management program which includes many repair projects that, due to their complexity, are
managed by its Engineering Department.
III. PROFESSIONAL SERVICES REQUIRED
The following descriptions cover the types of professional services OC San will require under
this agreement. OC San will determine that when specific services are required. The
mechanisms for requesting, reviewing, authorizing, and terminating services under this
agreement are documented in Attachment “A1” – Rules of Engagement. As described in that
attachment, work assignments will fall into one of the following types:
Task Authorizations. Task Authorizations have formal scopes of work and firm upper
limits.
Task Directives. Task Directives are typically smaller than Task Authorizations, but do
not have a firm upper limit.
Project Role Assignments. In Project Role Assignments, the Consultant will provide a
suitability qualified professional to fulfill the particular role on a particular project.
Program Role Assignments. In Program Role Assignments, the Consultant will provide
a suitability qualified professional to fulfill the project role on a portfolio of projects.
Architecture
Design and oversee design by consultants of new building projects and tenant improvement
projects. Work with City Building/Planning Departments, Fire Departments and other regulatory
agencies as a liaison on behalf of OC San to ensure projects comply with permitting and code
requirements.
SCOPE OF WORK PSA2021-002
1505425.1
Page 2 of 10
Prepare more complex plan clarifications and changes in response to Contractor’s Request for
Information during construction and verify that facilities constructed meet design specifications
and regulatory requirements.
Engineering – Construction Management
Construction management activities include the following:
Perform a variety of work functions supporting the design and construction of
wastewater treatment and collection systems.
Review construction documents including plans and specifications; interpret plans and
specifications for construction work performed by OC San’s contractors; ensure
contractual compliance with plans, specifications, codes and safety requirements; verify
that materials being incorporated into project are per specification and with approved
construction practices; coordinate equipment isolations, equipment and process tie-ins.
Prepare progress payments to the contractor; review submittals for material and
equipment conformance to design specifications and plans.
Perform analysis of change orders; negotiate fair and reasonable costs for change
orders; prepare change order reports and documents for consideration by the Board of
Directors.
Oversee the start-up of facilities; participate in staff training.
Provide technical assistance and support to engineers and project managers; provide
technical training as appropriate.
Prepare a variety of administrative, technical, and budget reports, memos, letters, and
correspondence.
Perform constructability reviews.
Maintain comprehensive contractual records and periodically monitor progress of all
goods and service agreements, from inception through completion, to enforce
milestones, deliverables and post-contract warranties.
Engineering – Civil / Mechanical
Prepare detailed drawings, technical specifications, and scopes of work; review proposals;
assist OC San in the consultants’ selection process and perform construction support services.
Design or oversee design by consultants of sanitary sewers, sewer rehabilitation, mechanical
piping systems, wastewater treatment systems, reclaimed water systems, lift stations, etc.
including calculations. Lead design reviews to perform a comprehensive multi-discipline design
review on assigned projects.
Respond to engineering bid questions and addenda, respond to contractor’s request for
information during construction of facility, verify that equipment meets design specifications, and
prepare design changes.
SCOPE OF WORK PSA2021-002
1505425.1
Page 3 of 10
Engineering - Electrical
Provide electrical engineering services including design, design review, interdisciplinary review
of design documents, construction support service for wastewater treatment plant electrical
generating and distribution systems. Design and oversee design by consultants for medium
voltage and low voltage electrical distribution systems and motor control systems including
switchgear, single line diagrams, elementary diagrams, motor control schematics, short circuit
calculations, protective device coordination studies, raceway/wire design, and hazardous area
classification.
Respond to contractor’s request for information during construction of facility, verify that
equipment meets design specifications, and prepare design changes, review NETA test results,
and perform electrical system startup and commissioning for low and medium-voltage systems.
Perform short circuit calculations and protective device coordination studies utilizing ETAP
software.
Engineering - I&C
Provide instrumentation and control engineering services including design, design review,
interdisciplinary review of design documents, construction support service, and commissioning
support for wastewater treatment plant control systems. Design and oversee design by
consultants for process and instrumentation diagrams, control strategies, control system
network diagrams, control system input/output list, control panel drawings, and commissioning
procedures.
Respond to contractor’s request for information during construction of facility, verify that
equipment meets design specifications, prepare design changes, and support startup and
commissioning.
Engineering – Commissioning Coordinator
Provide technical leadership and management of the development of commissioning
procedures during design; review the proposed construction sequencing and commissioning
packages established during design; review finalized commissioning procedures during
construction; work closely and coordinate with the contractor’s commissioning coordinator;
provide oversight of the contractor’s commissioning and start-up process and coordinate
startups with operations and maintenance; coordinate OC San’s inspection, control system
programming and engineering resources to support the contractor’s commissioning process;
track outstanding commissioning items and support their resolution; and work closely with the
resident engineer to provide commissioning status and notification of any issues or concerns.
The commissioning coordinator shall have knowledge in electrical, instrumentation, control
systems and process control.
Engineering - Structural
Prepare detailed drawings, technical specifications, and scopes of work; review proposals and
technical memoranda prepared by others; prepare engineering analysis.
SCOPE OF WORK PSA2021-002
1505425.1
Page 4 of 10
Provide structural analysis as needed to recommend structural improvements to existing
facilities, analyze structural failures and recommend repairs.
Design and oversee design by consultants of structural systems for water/wastewater facilities.
Respond to structural Requests for Information and/or prepare more complex structural
engineering design changes during construction of facility and verify that equipment meets
design specifications and regulatory requirements.
Inspection
Inspection activities include the following:
Provide construction inspection for plant and collection facilities construction work
performed by contractors to ensure contractual compliance with plans, specifications,
codes, regulations, and OC San’s safety standards.
Prepare a variety of reports and documentation.
Review construction documents including plans and specifications.
Inspect plant and collection facilities construction work performed by contractors.
Verify that materials being incorporated into project are per specification and with
approved construction practices.
Coordinate equipment and process isolations, shutdowns, and tie-ins.
Assist safety representatives with job hazard analysis.
Observe contractors work safety environment and compliance with traffic control plans
and devices; work with contractor to establish and maintain a safe construction project
for employees, customers, and the public.
Document and follow-up on actions regarding safety, traffic control plans, and working
practices.
Assist in the maintenance of accurate as-built contract drawings
Verify contractor as-built drawings are maintained and correct.
Assist Resident Engineers on field change orders, plan clarifications, and plan changes.
Review and approve final drawings for the preparation of record drawings.
Prepare and maintain necessary construction inspection records and reports as a means
of formal documentation including daily inspection reports, photo-logs, field test results,
force account reports, extra work requests, project submittal files, and individual project
logs.
Assist Resident Engineer in preparing monthly progress reports.
Attend construction meetings.
SCOPE OF WORK PSA2021-002
1505425.1
Page 5 of 10
Work with contractors, regulatory agencies, utilities, city officials and the general public
throughout construction project to coordinate work to be accomplished and ensure
satisfactory project completion with minimum impact on the public or OC San facilities.
Various disciplines may need continuous construction inspection including Civil, Structural,
Pipeline, Mechanical, Electrical and Instrumentation disciplines of large complex water
treatment facilities and rehabilitation.
Project Management
Project management functions for major capital projects include developing schedules, cost
estimates and staffing requirements; assembling and leading project teams; planning, directing,
and coordinating activities of projects to ensure that goals and objectives of projects are
accomplished on schedule and within prescribed budget; inspecting quality and quantity of
work; managing the selection of outside consultants; and preparing and presenting reports and
other necessary correspondence on assigned projects.
Manage a project or group of projects through all six phases of the Engineering Project Life
Cycle, including project development, preliminary design, construction and installation,
commissioning, and closeout.
Manage, direct, and coordinate activities of the project team to ensure project progresses on
schedule within prescribed budget, and with acceptable quality; confers with project team to
provide technical advice and resolve problems; conducts project team meetings to ensure
adequate communication of project status.
Perform periodic review of work assignments to ensure that the work is satisfactory and is
completed according to plan.
Interface with senior management, the Board of Directors, peers, project staff, consultants,
customers, and users as necessary to coordinate project execution; informs stakeholders of
project status and possible outcomes.
Prepare project reports for the Board of Directors, management, and others; makes
presentations as necessary.
Provides project management oversight of the selection process of outside consultants;
oversees the bid, proposal, and selection/purchase recommendation process for major capital
projects; solicits proposals; reviews proposals; assists OC San’s evaluation teams with selection
of consultants establishes schedules and performance criteria.
Work with consultants on project planning, preparation, scheduling, and execution of contracts;
ensures work is completed on time and in conformance with plans and specifications.
Apply project management tools as required to address the financial aspects and impacts of
project variables such as delays to the project schedule.
Serve as a liaison for the Engineering Department with other OC San departments, divisions,
and outside agencies; provide project representation to commissions, committees, and task
forces.
SCOPE OF WORK PSA2021-002
1505425.1
Page 6 of 10
Support – Administrative
Administrative support activities include the following:
Perform a variety of secretarial, advanced clerical, and routine administrative and
programmatic work in support of assigned projects or programs, division, or department.
Participate in the administration of approved policies and procedures.
Prepare financial analysis and a variety of reports as required.
Provide information and assistance to other assigned project or program staff regarding
assigned programs, policies and procedures.
Support – Cost Estimating
Cost estimating activities include the following:
Prepare cost estimates to provide detailed information regarding quantity and cost of
materials and labor.
Develop processes and/or techniques that provide clear and standard estimating
methods across projects.
Provide data for analytical comparisons between projects.
With estimating process, identify project cost changes as projects advance through the
design process.
Review engineering plans and specifications to determine materials and quantities
required by project specifications.
Recommend cost saving changes.
Review cost estimates and change orders submitted by construction contractors and
provide recommendations.
Provide data for analytical comparisons between projects.
Prepare general budget estimates for new projects.
Estimating shall include all disciplines including architectural, civil, structural, mechanical,
plumbing, heating and air conditioning, fire protection, electrical and control systems.
Support – Construction Scheduling
Perform a variety of scheduling review and analyses involving wastewater treatment and
collection systems, including the following activities:
Review design submittals prior to bid to ensure scope is achievable in the time
stipulated.
Establish clear specifications and enforcement provisions with the contractors by placing
schedule performance and proof of impact on the contractors.
SCOPE OF WORK PSA2021-002
1505425.1
Page 7 of 10
Review construction contractor’s schedules for effective contractor performance.
Review baseline schedule submittals.
Support the Resident Engineer (RE) and Project Manager (PM) during scheduling
meetings so they are effective and productive.
Maintain careful documentation of all schedule submittals so that any requests for time
adjustments can be measured against the approved schedule in place at the time of
impact is claimed.
Monitor actual progress versus planned progress. Provide exception reporting and
recommend actions.
Perform analysis of change orders such as time impact analysis (TIA) and productivity
claims.
Support – Construction Claims / Mitigation
Prepare detailed analysis of contractor-submitted requests for change, delay claims, time
impact analyses (TIA) and/or government code claims including productivity loss claims, claims
for differing site conditions, and/or total cost claims. Work may include analysis of liability,
review of contract language and supporting documents, validating extended overhead costs,
and review and analysis of any other supporting documentation.
Work may also include a proactive strategy to reduce exposure, review of reporting
requirements and practices, and conferring with project teams and/or managers to effectively
implement practices to reduce liability and/or risk.
Support – CAD Drafting and Design
CAD drafting and design support include the following activities:
Use Computer Aided Design (CAD) equipment to provide support to Engineers by
preparing layouts, detail drawings, sketches and diagrams. Drawings are to include all
views and dimensions necessary for construction of wastewater treatment and collection
systems. Work shall be compliant with OC San CAD Manual.
Draft engineering drawings of proposed wastewater treatment facility construction
projects from engineer’s design drawings, including structures and notations; review
maps and existing drawings to determine utility locations, elevations and other related
information.
Consolidate changes made on drawings by consultants, engineers and inspectors with
contractor’s as-built drawings to draft final record drawings on a wide variety of
wastewater treatment facility construction projects.
Conduct field visits to confirm existing conditions and finished construction configuration.
Make appropriate notes of sizes, diameters, locations and other significant information
and return to project engineer.
Provide technical assistance and support to engineers and engineering aides.
SCOPE OF WORK PSA2021-002
1505425.1
Page 8 of 10
IV. TASK ASSIGNMENTS
OC San will authorize specific tasks to be completed by CONSULTANT. These tasks will vary
widely in size, cost, and complexity. Tasks will be authorized as either a Task Authorization or a
Task Directive, as described in Attachment “A1” – Rules of Engagement.
V. PERSONNEL ASSIGNMENTS
OC San will require CONSULTANT to provide staff to fill specific roles on specific projects, and,
in some cases, for its Engineering Program, as described in Attachment “A1” – Rules of
Engagement.
Project Role Assignments
Project Role assignments involve CONSULTANT assigning a qualified individual or individuals
to fill a particular role on a particular project.
A project role may cover the entire role for the project, or a specifically designated portion of that
role. CONSULTANT shall identify a Technical Lead to support assigned staff in their
designated role. Project direction, however, will generally come from the Project Team and
Supervision in Engineering.
Program Role Assignments
Program Role assignments direct CONSULTANT to assign a qualified individual or individuals
to fill a particular role on an entire portfolio of projects.
Personnel Authorizations
Personnel Authorizations authorize a particular individual to work on Task Directives, Project
Roles, and Program Roles.
VI. LOGISTICS AND CONTRACT MANAGEMENT
Work Location
CONSULTANT’s on-site staff shall be located at OC San’s facilities in Fountain Valley or
Huntington Beach, California. At times, work may be required at other OC San facilities or at job
site locations away from OC San facilities. At the CONSULTANT’s discretion and concurrence
with the OC San representative, the assigned CONSULTANT staff may be located at
CONSULTANT’s home office. Advanced coordination with OC San may be required for
CONSULTANT staff working at OC San facilities on OC San holidays.
Point of Contact/Supervision
CONSULTANT shall designate an individual as the single point of contact to direct efforts in
fulfilling contracted obligations under this Agreement. The selected designee shall be
responsible for the direct supervision of assigned staff, including such activities as work
SCOPE OF WORK PSA2021-002
1505425.1
Page 9 of 10
schedules, quality of work performed, technical oversight, vacation requests, discipline, etc. The
selected designee shall not be changed without prior written notification to the OC San
representative.
CONSULTANT is responsible for supervision of its entire staff, including the requirements
defined in Attachment “A1” – Rules of Engagement:
OC San Project Document Management
CONSULTANT’s staff assigned to work on OC San projects shall save project related
deliverables, documents and/or records in OC San accessible locations i.e., OC San SharePoint
servers and/or OC San licensed cloud-based applications such as Bluebeam, PMWeb or One
Drive, as applicable to the project assignment, to comply with Public Records Act requirements.
Accessibility to these locations shall be provided by OC San.
Provided Facilities & Equipment
OC San will provide the following for CONSULTANT’s on-site staff:
Furnished office space at OC San
Computers, software, network, and printing capabilities
Office telephone
Personal Protective Equipment
CONSULTANT staff assigned to OC San facilities may be exposed to known plant process and
work hazards and therefore will be required to have appropriate Personal Protective Equipment
(PPE) such as: eye and face protection (safety glasses), head protection (hard hat), hand
protection (gloves), foot protection (safety toed shoes), high visibility clothing (Class 3 vests),
hearing protection, personal gas monitor (4 gas), fall protection (harness and lanyard) and other
forms of PPE. CONSULTANT shall provide all equipment and training necessary to comply with
OC San safety polices. Refer to Contractor Safety Standards – Attachment “K”.
Time Tracking & Invoicing
CONSULTANT shall submit invoices, including cost and hours, on a monthly basis. Invoice
shall be submitted no later than the 15th of each month. OC San maintains a project controls
system containing detailed cost and hours information for all Engineering Projects. The format
for reporting hours shall be in an importable format, such as Microsoft Excel, and contain, at a
minimum, the following items:
Column Description
Project Number OC San will provide a list of project numbers. These numbers are
subject to change as new projects are added and existing projects are
completed.
SCOPE OF WORK PSA2021-002
1505425.1
Page 10 of 10
Work Package
Number
OC San will provide a list of work package numbers. The work
package numbers are subject to change as a project transitions from
one phase to the next.
Employee ID Each employee included in the hours report must contain a unique
identification number.
Employee Name Employee name.
Work Date The week ending date when work was performed.
Hours by Week The total number of hours worked for the week. In addition, it may be
necessary to report overtime hours which will require a separate
report.
Total Burdened Cost The total burdened cost shall include actual salary, fringe costs,
overhead, and profit by person.
Work Quality
CONSULTANT shall be responsible for the professional quality and technical competence of
assigned staff supplied to OC San. Additionally, the firm shall be responsible for the
coordination of all efforts and other services furnished under the agreement.
Management of Resource Assignments
OC San will maintain a cloud-based workflow tool to request, review, authorize, and close
resource assignments. That workflow tool is currently PMWeb. CONSULTANT’s Point of
Contact will be required to utilize this tool to track all requests through their life cycles. OC San
will use this workflow tool to verify that any invoiced costs have been duly approved through the
workflow tool.
Rules of Engagement PSA2021-002
Page 1 of 4
ATTACHMENT A1
RULES OF ENGAGEMENT
This document describes options for OC San to utilize a Supplemental Engineering
Services (SES) agreement to maintain the Engineering Project program while
complying with Independent Contractor expectations.
There are four mechanisms by which professional services can be supplied through the
SES agreement:
Task Authorizations
Task Directives
Project Role Assignments
Program Role Assignments
Task Directives, Project Role Assignments, and Program Role assignments require that
anyone working under the mechanism also have an approved Personnel Authorization.
These Terms of Engagement are intended to document how services are to be
requested, authorized, and managed.
Task Authorizations
Task Authorizations have a formal scope of work, and a fixed upper limit. Distinguishing
aspects of Task Authorizations include the following:
Requests for Task Authorization Proposals (RFTAPs) require a scope of work
prepared by OC San staff.
RFTAPs and Task Authorizations must be approved by the Director of
Engineering (DOE).
The scope of work should have the same level of detail as used for a Design
Task Order or Planning Study Task Order, including schedule requirements,
task, deliverables, and assumptions.
Task Authorization must specify a firm negotiated upper limit which may not be
exceeded. If changes require a revision to that upper limit, it must be processed
as a formal Task Authorization Amendment prior to the work being authorized
and performed.
The SES Consultant shall report costs incurred for the Task Authorization in their
monthly invoices, with the total costs incurred to date, and the unused budget
remaining.
The SES Consultant may use any of their staff, whether they have an approved
Personnel Authorization or not.
The time that SES Consultant staff charge to Task Authorizations does not count
against their approved number of hours for Personnel Authorizations.
Rules of Engagement PSA2021-002
Page 2 of 4
Task Directives
Task Directives also have an explicit scope of work, but the level of detail may be lower.
Task Directives need a negotiated budgetary estimate, but it is not a firm upper limit.
The scope of work for Task Directives may be less detailed than what is required
for a Task Authorization.
A schedule to complete the work should generally be specified but is not always
required.
Costs are tracked separately on invoices.
Personnel Authorizations are required for any staff working on a Task Directive.
Project Role
Project Role assignments direct the SES Consultant to assign a qualified individual or
individuals to fill a particular role on a particular project. Standard project roles are
listed below:
Admin Support
Construction Support
Electrical Engineer
Estimator
I&C Engineer
Inspection Civil - Mech
Inspection Elec - I&C
Project Engineer
Project Manager
Resident Engineer
Submittals Group
A project role may cover the entire role for the project, or a specifically designated
portion of that role. When a role is limited, the description of the specific designation
shall be included in the Resource Assignment Request.
The timing of delivery is based on the project schedule, or the specific
designation.
SES Staff designated on an approved Project Role assignment shall work
directly with other project team members (OC San or SES).
The Resource Assignment request shall indicate the anticipated fraction of a full-
time equivalent the role is anticipated to take.
Personnel Authorizations are required for any Project Role assignments.
Time spent in a Project Role counts against Personnel Authorizations.
The SES Consultant shall identify a Technical Lead to support assigned SES
Staff member in their designated role. Project direction, however, will generally
come from the Project Team and Supervision in Engineering.
Rules of Engagement PSA2021-002
Page 3 of 4
Program Role
Program Role assignments direct the SES Consultant to assign a qualified individual or
individuals to fill a particular role on an entire portfolio of projects. Program role
assignments are intended to be used in two circumstances:
When OC San has no staff with the required qualification. An example of this is
structural engineering.
When a pool of qualified individuals is required, with assignments and timing
varying from day to day. This case applies specifically to inspection. In the case
of inspection, the SES Consultant shall designate a dispatcher, with whom OC
San’s Inspection Supervisor can coordinate assignments and schedules. The
dispatcher may be one of the assigned inspectors, the SES Point of Contact, or
another appropriate representative of the SES Consultant.
The following apply to Program Roles:
Program Role assignments will generally be made before the specific need
arises.
Only supervisors or managers may initiate a Program Role request.
Project Role assignments must be approved by the Engineering Manager
responsible for the function.
Personnel Authorizations are required for any Program Role assignments.
Time spent in a Program Role counts against Personnel Authorizations.
Personnel Authorizations
Personnel authorizations (PA’s) provide the DOE’s approval for a particular individual to
work on Task Directives, Project Roles, and Program Roles. They also designate the
following:
The Project Role.
Their location as either Home Office or Site. This impacts the overhead rate to
be used for billing.
The number of hours per week, or just a set number of hours as needed.
The total bill rate, including actual salary, overhead, and profit.
Any reimbursable expenses. This is typically used when travel is required or
when a staff member needs a vehicle assigned to them due to the nature of their
assignments.
The following apply to Personnel Authorization:
They require approval by the DOE.
They are specific to one person.
They need not be project specific.
For on-site PA’s, the PA authorizes office space, key cards, an OC San phone
extension, and network access.
Rules of Engagement PSA2021-002
Page 4 of 4
Staff Supervision
The SES Consultant is responsible for supervision of its entire staff, including the
following:
Administrative Supervision (SES Consultant staff only)
o Performance Reviews
o Timecard Approvals o Work Hours
Supervision of Assigned Scope Deliverables
o Work Prioritization
o Technical input, guidance, and direction
Quality Control for
o Task Authorizations.
o Task Directives, when Quality Control is specified in the scope of work.
OC San will not be responsible for supervision of SES Consultant staff. OC San will
however provide direction as an Owner. Examples include the following:
Project decisions and priorities
Design standards
OC San’s preferences
Financial considerations
Risk considerations
Review for compliance with OC San Policies and Procedures
Coordination with other OC San projects and activities
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 1 of 19
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT, is made and entered into to be effective the 1st day of May, 2022, by and between the ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to as
"OC SAN", and JACOBS PROJECT MANAGEMENT CO., for purposes of this AGREEMENT hereinafter referred to as "CONSULTANT". OC SAN and CONSULTANT are referred to herein collectively as the "Parties" or individually as a "Party." WITNESSETH: WHEREAS, OC SAN desires to engage a consultant for Supplemental Engineering Services, PSA2021-002-2, to provide qualified staff as described in Attachment “A”, Scope of Work; and Attachment “A1”, Rules of Engagement, and, WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the requisite personnel and experience, and is capable of performing such services; and,
WHEREAS, OC SAN has adopted procedures for the selection of professional services and has proceeded in accordance with said procedures to select a CONSULTANT to perform this work; and,
WHEREAS, OC SAN shall manage selection of a Consultant for Task Order(s) when requested after award of this AGREEMENT based on the most appropriate qualifications and fit; and, WHEREAS, at its regular meeting on April 27, 2022 the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee to approve this AGREEMENT between OC SAN and CONSULTANT. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this AGREEMENT, it is mutually agreed as follows:
1. SCOPE OF WORK
CONSULTANT agrees to furnish necessary professional services to accomplish the
Scope of Work attached hereto as "Attachment A". Attachment “A” is hereby incorporated into this AGREEMENT. In the event of a conflict between the Scope of Work and this AGREEMENT, the terms of this AGREEMENT shall prevail.
The standard of care applicable to CONSULTANT’s services will be the degree of skill and diligence normally employed by professional engineers or consultants performing the same or similar services at the time CONSULTANT’s services are performed.
2. COMPENSATION Total compensation shall be paid to CONSULTANT for services in accordance with the following provisions:
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 2 of 19
A. Time and Material: Not to Exceed Aggregate Amount
OC SAN shall compensate CONSULTANT for services performed under this AGREEMENT on a time and materials basis, not to exceed a maximum aggregate amount of Twenty-Nine Million Seven Hundred Thousand Dollars
($29,700,000) (“Total Compensation”) during the term of the AGREEMENT.
B. Hourly Rates As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus
benefits, overhead, and profit) actually paid by CONSULTANT charged on an hourly-rate basis to this project and paid to the personnel of CONSULTANT per Attachment “E”. OC SAN shall also pay to CONSULTANT a sum equal to the premium costs for overtime, charged on an hourly-rate basis, actually paid by CONSULTANT to the non-exempt personnel of CONSULTANT plus profit. Premium costs for overtime will not include fringe and overhead. Attachment “E” is hereby incorporated by reference. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this AGREEMENT.
C. Overhead i. “Field Staff” are defined as project-assigned staff by CONSULTANT, working at OC SAN’s facilities for a project-assigned period exceeding ninety (90) continuous calendar days. The overhead rates for Field Office Staff are included in Attachment “E”. ii. “Home Office Staff” are defined as staff assigned by CONSULTANT,
supporting the project-assigned work, either by working at CONSULTANT’s or Subconsultant’s offices or at OC SAN’s site for periods less than ninety (90) continuous calendar days. The overhead rates for Home Office Staff
are included in Attachment “E”.
D. Profit
Profit for CONSULTANT and Subconsultants shall be five percent (5%). Addenda shall be governed by the same maximum Profit percentage. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this AGREEMENT.
E. Subconsultants
For all Subconsultants, CONSULTANT may pay to Subconsultants total compensation on an hourly-rate basis per Attachment “E” – Fee Proposal and as specified in the Scope of Work. The SANITATION DISTRICT shall pay to
CONSULTANT the actual costs of Subconsultants, without markup.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 3 of 19
F. Escalation
For purposes of calculating hourly billing rates of CONSULTANT employees and
any Subconsultant employees performing services under this AGREEMENT, the Maximum Hourly Rate as defined in Attachment “E” shall be adjusted annually based on the Employment Cost Index (ECI) of Los Angeles-Long Beach-
Anaheim, California as of July 1 of each year. This rate is from the United States Department of Labor Bureau of Labor Statistics. The annual adjustments shall not exceed three percent (3%). The first hourly rate escalation will occur July 1, 2023.
G. Reimbursable Direct Costs
OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this AGREEMENT. The reimbursement of the above-mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of reimbursements based upon receipts and a “per diem” component approved by
IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at http://www.gsa.gov/portal/category/104711#. The CONSULTANT shall be responsible for the most economical and practical means or management of reimbursable costs inclusive but not limited to travel,
lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN. Travel and travel arrangements – Any travel involving airfare, overnight stays or
multiple day attendance must be approved by OC SAN in advance. Local Travel is considered travel by the CONSULTANT within OC SAN
geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel. Lodging – Overnight stays will not be approved by OC SAN for local travel.
However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN. Travel Meals – Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are appropriate for travel times. Receipts are not required for the approved meals.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 4 of 19
Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this AGREEMENT.
OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN.
OC SAN will not pay per diem for Field Office Staff, nor will it pay for any relocation of staff to be assigned under this AGREEMENT.
H. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services described in any of CONSULTANT’s Task Authorizations will exceed seventy-five percent (75%) of the not-to-exceed amount of the Task Authorization, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the
express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s
invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this AGREEMENT.
3. REALLOCATION OF TOTAL COMPENSATION
OC SAN, by its Director of Engineering, shall have the right to approve a reallocation of the incremental amounts constituting the Total Compensation, provided that the Total Compensation is not increased.
4. KEY POSITIONS
CONSULTANT shall notify OC SAN in advance changes to any key CONSULTANT employees performing services under this AGREEMENT. Positions considered to be Key Positions are Point of Contact, and any field office staff working under the AGREEMENT.
Should a CONSULTANT employee within one of these categories become no longer available to OC SAN, CONSULTANT shall submit the resume and qualifications of the proposed replacement to OC SAN for approval as soon as possible, but in no event later
than seven (7) calendar days prior to the departure of the incumbent Key Position unless CONSULTANT is not provided with such notice by the departing staff.
5. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any corrections or revisions of the work for that invoicing period, in a format acceptable to OC SAN. CONSULTANT shall warrant and certify the accuracy of these costs and provide all support documentation required by OC SAN. CONSULTANT understands that submitted costs are subject to Section 16 Audit Provisions.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 5 of 19
B. Upon receipt of a properly prepared invoice, as described above, payment shall be made by OC SAN to CONSULTANT within sixty (60) calendar days.
C. Upon satisfactory completion of the work performed hereunder and prior to final payment under this AGREEMENT for such work, or prior settlement upon termination of this AGREEMENT, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this AGREEMENT other than such claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein.
D. Pursuant to the California False Claims Act (Government Code sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this AGREEMENT may be held liable for treble
damages and up to a $10,000 civil penalty for each false claim submitted. This section shall also be binding on all Subconsultants.
A CONSULTANT or Subconsultant shall be deemed to have submitted a false
claim when the CONSULTANT or Subconsultant: (a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by OC SAN; (c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; (d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or (e) is a beneficiary of an inadvertent submission of a false claim to OC SAN,
and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim.
6. TERM
This AGREEMENT shall commence upon the effective date first written above, and shall continue in full force and effect through April 30, 2025, (“Initial Term”) unless earlier terminated or extended as provided in the AGREEMENT. OC SAN, at its sole discretion,
may elect to extend the term of this AGREEMENT up to an additional twelve (12) months, commencing May 1, 2025, and continuing through April 30, 2026, (“Option Term 1”), and thereupon require CONSULTANT to continue to provide services, and otherwise
perform, in accordance with Attachment “A”, entitled “Scope of Work” and Attachment “A1”, entitled “Rules of Engagement”.
OC SAN, at its sole discretion, may elect to extend the term of this AGREEMENT up to an additional twelve (12) months, commencing May 1, 2026, and continuing through April 30, 2027, (“Option Term 2”), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A”, entitled “Scope of Work”, and Attachment “A1”, entitled “Rules of Engagement”.
OC SAN’s election to extend the AGREEMENT beyond the Initial Term shall not diminish its right to terminate the AGREEMENT for OC SAN’s convenience or CONSULTANT’s default as provided elsewhere in this AGREEMENT. The “maximum term” of this AGREEMENT shall be from the effective date first written above through
April 30, 2027, which period encompasses the Initial Term and two (2) Option Terms.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 6 of 19
7. PREVAILING WAGES
To the extent CONSULTANT intends to utilize employees who will perform work during
the AGREEMENT, as more specifically defined under Labor Code Section 1720, CONSULTANT shall be subject to prevailing wage requirements with respect to such employees.
8. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES
A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform Work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR
and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section
1771.4, the Work is subject to compliance monitoring and enforcement by the DIR.
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776.
C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants
shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the
Department of Industrial Relations.
D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e).
9. CONFLICT OF INTEREST CODE
OC SAN may designate some or all of the individuals performing services under the AGREEMENT as “designated positions” subject to OC SAN’s Conflict of Interest Code. Consultant employees acting in these designated positions must comply with certain
requirements under the Political Reform Act. Consultant employees acting in these designated positions must file an annual report identifying some or all of their financial interests such as sources of income, sources of gifts received from special sources of
income and sources of gifts. Currently the limit is $520 per year from any one source. CONSULTANT and all its employees, staff, or personnel assigned to an OC SAN designated position shall comply with the Political Reform Act and related reporting
requirements and gift limitation.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 7 of 19
10. INDEPENDENT CONTRACTOR
The CONSULTANT and Subconsultants shall be independent contractors and not
agents of OC SAN. Any provisions of this AGREEMENT that may appear to give OC SAN the right to direct the CONSULTANT concerning the details of performing the professional services, or to exercise any control over such performance, shall mean only
that the CONSULTANT shall follow the direction of OC SAN concerning the end results of the performance.
11. DOCUMENT OWNERSHIP – CONSULTANT PERFORMANCE
A. Ownership of Documents for the Professional Services performed.
All documents in all forms (electronic, paper, etc.), including, but not limited to,
studies, sketches, drawings, computer printouts, disk files, and electronic copies prepared in connection with or related to the Scope of Work or Professional Services, shall be the property of OC SAN. OC SAN’s ownership of these documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed. OC SAN ownership entitlement arises upon payment or any partial payment for
work performed and includes ownership of any and all work product completed prior to that payment. This Section shall apply whether the CONSULTANT’s Professional Services are terminated: a) by the completion of the AGREEMENT, or b) in accordance with other provisions of this AGREEMENT. Notwithstanding any other provision of this paragraph or AGREEMENT, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer printouts and disk files, and specifications. OC SAN acknowledges that documents prepared through Professional Services must be revised and sealed by a professional engineer prior to their reuse on another project. OC SAN acknowledges that it assumes all risk associated with reuse of such documents, which are not undertaken by CONSULTANT.
B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the study or deliverable where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service
rendered by CONSULTANT was not a proximate cause of the damage.
12. INSURANCE
A. General i. Insurance shall be issued and underwritten by insurance companies acceptable to OC SAN. ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Worker’s Compensation Insurance subject to OC SAN’s option to require a change
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 8 of 19
in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any
insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to CONSULTANT, by OC SAN or its agent.
iii. Coverage shall be in effect prior to the commencement of any work under this AGREEMENT. B. General Liability The CONSULTANT shall maintain during the life of this AGREEMENT, including the period of warranty, Commercial General Liability Insurance written on an occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000) aggregate. If aggregate limits apply separately to
this contract (as evidenced by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: Premises-
Operations, blanket contractual liability (for this AGREEMENT), products liability/completed operations (including any product manufactured or assembled), broad form property damage, blanket contractual liability,
independent contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) and Riggers/On Hook Liability must be included in the General Liability policy and coverage must be reflected on the submitted Certificate of Insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC SAN, its or their officers, agents, or
employees, and any other consultant, contractor or subcontractor performing work or rendering services on behalf of OC SAN in connection with the planning, development and construction of the project. In all its insurance
coverages related to the work, CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their officers, agents, or employees, or any other consultant,
contractor or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 9 of 19
C. Umbrella Excess Liability
The minimum limits of general liability and Automotive Liability Insurance required, as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess
coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automotive liability. D. Automotive/Vehicle liability Insurance The CONSULTANT shall maintain a policy of Automotive Liability Insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: Combined single limit of Five Hundred Thousand Dollars ($500,000). A statement on an insurance certificate will not be accepted in lieu of the actual
additional insured endorsement. E. Drone Liability Insurance
If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of One Million Dollars ($1,000,000) in a form
acceptable by OC SAN. F. Worker’s Compensation Insurance The CONSULTANT shall provide such Workers’ Compensation Insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including Employer’s Liability Insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such Worker’s Compensation Insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance
Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones Act claims.
G. Errors and Omissions/Professional Liability
CONSULTANT shall maintain in full force and effect, throughout the term of this AGREEMENT, standard industry form professional negligence errors and omissions insurance coverage in an amount of not less than Five Million Dollars ($5,000,000) with limits in accordance with the provisions of this Paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this AGREEMENT, and for a period of five (5) years from the date of the completion of the services hereunder. In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of CONSULTANT during the course of performing services under the term of this
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 10 of 19
AGREEMENT. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the
present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis, said
policy shall be continued in full force and effect during the term of this AGREEMENT or until completion of the services provided for in this AGREEMENT, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts of CONSULTANT during the course of performing services under the term of this AGREEMENT. CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy, and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term.
H. Proof of Coverage The CONSULTANT shall furnish OC SAN with original certificates and
amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before work commences. OC SAN
reserves the right to review redacted copies of all required insurance policies, provided that neither the policy limits nor carrier names are redacted, including endorsements, effecting the coverage required, at any time. The following are approved forms that must be submitted as proof of coverage:
• Certificate of Insurance ACORD Form 25 or other equivalent Certificate of Insurance form.
• Additional Insurance (General Liability)
The combination of (ISO Forms) CG 2010 and CG 2037 All other Additional Insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide
different or less coverage to OC SAN.
• Additional Insured (Auto Liability)
Submit endorsement provided by carrier for
OC SAN approval.
• Waiver of Subrogation Submit workers’ compensation waiver of
subrogation endorsement provided by carrier for OC SAN approval.
• Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC SAN of any pending or actual insurance policy
cancellation, as described in Article I. Cancellation and Policy Change Notice, below.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 11 of 19
I. Cancellation and Policy Change Notice
The CONSULTANT is required to notify OC SAN in writing of any insurance
cancellation notice it receives or other knowledge of pending or actual insurance
policy cancellation, within two (2) working days of receipt of such notice or
acquisition of such knowledge. Additionally, the CONSULTANT is required to
notify OC SAN in writing of any change in the terms of insurance, including
reduction in coverage or increase in deductible/SIR, within two (2) working days
of receipt of such notice or knowledge of same.
Said notices shall be mailed to OC SAN at:
ORANGE COUNTY SANITATION DISTRICT
10844 Ellis Avenue, Fountain Valley, CA 92708 Attention: Contracts, Purchasing & Materials Management Division
J. Primary Insurance The General and Automobile liability policies shall contain a Primary and Non-
Contributory Clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT.
K. Separation of Insured The General and Automobile liability policies shall contain a “Separation of Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this AGREEMENT, or the extent to which CONSULTANT may be held responsible for payment of damages to persons or property.
M. Deductibles and Self-Insured Retentions
Any deductible and/or self-insured retention must be declared to OC SAN on the Certificate of Insurance. All deductibles and/or self-insured retentions require approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce
or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses. N. Defense Costs
The General and Automobile Liability policies shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 12 of 19
O. Subconsultants
The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the
Subconsultant’s operations and work.
13. SCOPE CHANGES
In the event of a change in the Scope of Work or a change in Key Personnel, or change in hourly rates, as requested by OC SAN, the Parties hereto shall execute an Amendment to this AGREEMENT setting forth with particularity all terms of the new AGREEMENT. CONSULTANT’s compensation for additional services authorized and performed in accordance with this AGREEMENT shall be agreed to by OC SAN and CONSULTANT in writing prior to the time that the additional services are authorized. An Amendment shall be executed to document the change.
CONSULTANT hereby agrees to use any and all procedures, programs, and systems required by OC SAN to process and execute such Amendment(s), including, but not
limited to, computer programs and systems.
14. PROJECT TEAM AND SUBCONSULTANTS
Neither this AGREEMENT nor any interest herein nor claim hereunder may be assigned by CONSULTANT either voluntarily or by operation of law, nor may all or any part of the AGREEMENT be subcontracted by CONSULTANT, without the prior written consent of OC SAN. Consent by OC SAN shall not be deemed to relieve CONSULTANT of its
obligation to comply fully with all terms and conditions of this AGREEMENT.
CONSULTANT shall provide to OC SAN, prior to execution of this AGREEMENT, the names and full description of all Subconsultants and CONSULTANT’s project team members anticipated to be used under this AGREEMENT by CONSULTANT. CONSULTANT shall include a description of the work and services to be done by each Subconsultant and each of CONSULTANT’s team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant, broken down as indicated in Section 2- COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT’s team members without prior written approval by OC SAN.
15. ENGINEERING REGISTRATION
The CONSULTANT's personnel and Subconsultants are comprised of registered engineers and a staff of specialists and draftsmen in each department. The firm itself is not a registered engineer but represents and agrees that wherever, in the performance of this AGREEMENT, the services of a registered engineer is required, such services hereunder will be performed under the direct supervision of registered engineers who are registered in California.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 13 of 19
16. AUDIT PROVISIONS
A. OC SAN retains the reasonable right to access, review, examine, and audit, any
and all books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the CONSULTANT is in compliance with all requirements under this AGREEMENT.
The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this AGREEMENT during the term of this AGREEMENT and for a period of three (3) years after its termination.
C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The
CONSULTANT shall make available to OC SAN for review and audit, all project related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the
CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified employee of the CONSULTANT will be available to assist OC SAN’s auditor in obtaining all accounting records and documents, and any other financial data related to this AGREEMENT.
17. LEGAL RELATIONSHIP BETWEEN PARTIES
The legal relationship between the parties hereto is that of an independent contractor and nothing herein shall be deemed to transform CONSULTANT, its staff, independent
contractors, or Subconsultants into employees of OC SAN. CONSULTANT’S staff performing services under the AGREEMENT shall at all times be employees and/or independent contractors of CONSULTANT. CONSULTANT shall monitor and control its
staff and pay wages, salaries, and other amounts due directly to its staff in connection with the AGREEMENT. CONSULTANT shall be responsible for hiring, review, and termination of its staff and shall be accountable for all reports and obligations respecting
them, such as social security, income tax withholding, unemployment compensation, workers’ compensation and similar matters.
To the fullest extent permitted by law, CONSULTANT shall defend and indemnify OC
SAN from and against any and all claims by CONSULTANT, its principals, officers, agents, employees, former employees, suppliers, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them for benefits provided to employees of OC SAN, including, but not limited to: worker’s compensation, unemployment compensation, participation in the Orange County Employees Retirement System, paid time off, medical insurance, dental insurance, vision insurance,
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 14 of 19
life/accidental death and dismemberment insurance, disability insurance, etc. In addition, CONSULTANT shall be required to indemnify the Indemnified Parties for any
costs related to such claims.
18. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of
this AGREEMENT, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return receipt requested, postage prepaid and addressed as follows:
ORANGE COUNTY SANITATION DISTRICT 10844 Ellis Avenue Fountain Valley, CA 92708-7018 Attention: Diane Marzano, Senior Contracts Administrator Copy: Jeffrey Mohr, Engineering Manager CONSULTANT:
JACOBS PROJECT MANAGEMENT CO. 2600 Michelson Drive, Suite 500 Irvine, CA 92612
Attention: Anni Larkins, Point-of-Contact All communication regarding the Scope of Work, will be addressed to the Engineering
Manager. Direction from other OC SAN staff must be approved in writing by OC SAN’s Engineering Manager prior to any action by the CONSULTANT.
19. TERMINATION
OC SAN may terminate this AGREEMENT at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination, CONSULTANT shall be entitled to compensation for work performed on a prorated basis through and including the effective date of termination.
CONSULTANT shall be permitted to terminate this AGREEMENT upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in accordance with the provisions of this AGREEMENT, when the same are due.
Notice of termination shall be mailed to OC SAN at the address listed in Section 18 -
NOTICES.
20. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this AGREEMENT shall become the property of
OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, electronic materials, computation and study materials in its files pertaining to the work described in this AGREEMENT, which is requested in writing by OC SAN.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 15 of 19
21. COMPLIANCE
A. Labor
CONSULTANT certifies by the execution of this AGREEMENT that it pays employees not less than the minimum wage as defined by law, and that it does
not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all federal, state and local directives and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment. B. Air Pollution CONSULTANT and its subconsultants and subcontractors shall comply with all applicable federal, state and local air pollution control laws and regulations.
C. Iran Contracting Act CONSULTANT and its subconsultants and subcontractors shall comply with the
Iran Contracting Act of e and local air pollution control laws and regulations. (Public Contract Code sections 2200-2208).
22. AGREEMENT EXECUTION AUTHORIZATION
Both OC SAN and CONSULTANT do covenant that each individual executing this document by and on behalf of each Party) is a person duly authorized to execute this AGREEMENT for that Party.
23. DISPUTE RESOLUTION
In the event of a dispute arising between the parties regarding performance or interpretation of this AGREEMENT, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar organization or entity conducting alternate dispute resolution services.
24. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS
If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this AGREEMENT, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which he may be entitled.
25. INDEMNIFICATION
To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at
CONSULTANT’s sole cost and expense and with legal counsel approved by OC SAN, which approval shall not be unreasonably withheld), protect and hold harmless OC SAN and all of OC SAN’s officers, directors, employees, CONSULTANT’s, and agents (collectively the “Indemnified Parties”), from and against any and all claims, damages, liabilities, causes of action, suits, arbitration awards, losses, judgments, fines, penalties,
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 16 of 19
costs and expenses (including, without limitation, attorneys’ fees, disbursements and court costs, and all other professional, expert or CONSULTANT’s fees and costs and
OC SAN’s general and administrative expenses; individually, a “Claim”; collectively, “Claims”) which may arise from or are in any manner related, directly or indirectly, to any work performed, or any operations, activities, or services provided by CONSULTANT in
carrying out its obligations under this AGREEMENT to the extent of the negligent, recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents, employees, CONSULTANT’s suppliers, CONSULTANT, Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of them, regardless of any contributing negligence or strict liability of an Indemnified Party. Notwithstanding the foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from: (A) the active negligence or willful misconduct of the Indemnified Parties; or (B) a natural disaster or other act of God, such as an earthquake; or
(C) the independent action of a third party who is neither one of the Indemnified Parties
nor the CONSULTANT, nor its principal, officer, agent, employee, nor CONSULTANT’s supplier, CONSULTANT, Subconsultant, subcontractor, nor anyone employed directly or indirectly by any of them.
Exceptions (A) through (B) above shall not apply, and CONSULTANT shall, to the fullest extent permitted by law, indemnify the Indemnified Parties, from Claims arising from more than one cause if any such cause taken alone would otherwise result in the obligation to indemnify hereunder.
CONSULTANT’s liability for indemnification hereunder is in addition to any liability CONSULTANT may have to OC SAN for a breach by CONSULTANT of any of the provisions of this AGREEMENT. Under no circumstances shall the insurance
requirements and limits set forth in this AGREEMENT be construed to limit CONSULTANT’s indemnification obligation or other liability hereunder. The terms of this AGREEMENT are contractual and the result of negotiation between the parties hereto. Accordingly, any rule of construction of contracts (including, without limitation, California Civil Code Section 1654) that ambiguities are to be construed against the drafting party, shall not be employed in the interpretation of this AGREEMENT.
CONSULTANT is indemnified in OC SAN’s standard construction contracts. This indemnification is in the General Conditions which are attached to OC SAN’s standard construction contracts when these contracts are issued.
26. DUTY TO DEFEND
The duty to defend hereunder is wholly independent of and separate from the duty to
indemnify and such duty to defend shall exist regardless of any ultimate liability of CONSULTANT and shall be consistent with Civil Code section 2782.8. Such defense obligation shall arise immediately upon presentation of a Claim by any person if, without
regard to the merit of the Claim, such Claim could potentially result in an obligation to indemnify one or more Indemnified Parties, and upon written notice of such Claim being provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the
payment or advance of defense costs by any Indemnified Party shall not be a condition
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 17 of 19
precedent to enforcing such Indemnified Party’s rights to indemnification hereunder. In the event a final judgment, arbitration, award, order, settlement, or other final resolution
expressly determines that the claim did not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent, then OC SAN will reimburse CONSULTANT for the reasonable costs of defending the
Indemnified Parties against such claims. CONSULTANT’s indemnification obligation hereunder shall survive the expiration or earlier termination of this AGREEMENT until such time as action against the Indemnified Parties for such matter indemnified hereunder is fully and finally barred by the applicable statute of limitations.
27. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES CONSULTANT shall comply with all OC SAN policies and procedures including the Contractor Safety Standards, as applicable, all of which may be amended from time to time.
28. CLOSEOUT
When OC SAN determines that all Work authorized under the AGREEMENT is fully complete and that OC SAN requires no further work from CONSULTANT, or the AGREEMENT is otherwise terminated or expires in accordance with the terms of the AGREEMENT, OC SAN shall give the Consultant written notice that the AGREEMENT will be closed out. CONSULTANT shall submit all outstanding billings, work submittals,
deliverables, reports or similarly related documents as required under the AGREEMENT within thirty (30) days of receipt of notice of AGREEMENT closeout. Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the AGREEMENT and will either: i. Give the CONSULTANT a final AGREEMENT Acceptance: or
ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost.
CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in the AGREEMENT Such support must be provided within the timeframe requested by OC SAN. Notwithstanding the final AGREEMENT acceptance, the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its
obligations to complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise), and the CONSULTANT shall remain obligated under all those provisions of the AGREEMENT which expressly or by their nature extend beyond and survive final AGREEMENT Acceptance.
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 18 of 19
Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for final AGREEMENT Acceptance as set forth above shall not be deemed to be
acceptance of the work by OC SAN for any purpose nor imply acceptance of, or AGREEMENT with, the CONSULTANT’s request for final AGREEMENT Acceptance.
29. PROHIBITION
During the term of this AGREEMENT, CONSULTANT and its Subconsultants may not propose on any engineering or construction-related projects advertised by or on behalf of OC SAN, if such work presents actual or perceived conflict of interest with CONSULTANT’s assignments with OC SAN.
CONSULTANT and its Subconsultants shall promptly disclose to OC SAN when such conflict exists prior to participating in any work as advertised by OC SAN or on its behalf.
CONSULTANT and its Subconsultants acknowledge and agree that OC SAN’s determination regarding such conflicts, that may impact CONSULTANT’s and its Subconsultants’ ability to propose on the work as described herein, shall be final and cannot be appealed.
30. ENTIRE AGREEMENT
This AGREEMENT constitutes the entire understanding and AGREEMENT between the Parties and supersedes all previous negotiations between them pertaining to the subject matter thereof.
[THIS SECTION INTENTIONALLY LEFT BLANK]
PSA PSA2021-002-2
Revised 110221 SUPPLEMENTAL ENGINEERING SERVICES
Page 19 of 19
IN WITNESS WHEREOF, this AGREEMENT has been executed in the name of OC SAN, by its officers thereunto duly authorized, and CONSULTANT as of the day and year first above
written. CONSULTANT: JACOBS PROJECT MANAGEMENT CO. By __________________________________________________ Date __________________________________________________ Printed Name & Title
ORANGE COUNTY SANITATION DISTRICT
By __________________________________________________ John B. Withers Date
Board Chairman
By __________________________________________________
Kelly A. Lore Date Clerk of the Board
By __________________________________________________ Ruth Zintzun Date Purchasing & Contracts Manager Attachments: Attachment “A” – Scope of Work
Attachment “A1” – Rules of Engagement Attachment “B” – Not Used Attachment “C” – Not Used
Attachment “D” – Allowable Direct Costs Attachment “E” – Fee Proposal Attachment “F” – Not Used
Attachment “G” – Not Used Attachment “H” – Not Used Attachment “I” – Not Used Attachment “J” – Not Used Attachment “K” – Contractor Safety Standards Attachment “L” – Not Used
DM:ms
SCOPE OF WORK PSA2021-002
1505425.1
Page 1 of 10
ATTACHMENT A
SCOPE OF WORK
I. SUMMARY
Orange County Sanitation District (OC San) is a special district responsible for wastewater
conveyance and treatment for metropolitan Orange County, California. It has been in existence
since 1954 and is the third largest wastewater treatment agency west of the Mississippi River.
OC San is soliciting Proposals to provide its engineering projects, which includes large and
small capital projects and operationally funded repair projects.
II. BACKGROUND
OC San has budgeted for a 10-year $3.0 billion capital improvement program, the vast majority
of which is managed by the Engineering Department. OC San also has an active asset
management program which includes many repair projects that, due to their complexity, are
managed by its Engineering Department.
III. PROFESSIONAL SERVICES REQUIRED
The following descriptions cover the types of professional services OC San will require under
this agreement. OC San will determine that when specific services are required. The
mechanisms for requesting, reviewing, authorizing, and terminating services under this
agreement are documented in Attachment “A1” – Rules of Engagement. As described in that
attachment, work assignments will fall into one of the following types:
Task Authorizations. Task Authorizations have formal scopes of work and firm upper
limits.
Task Directives. Task Directives are typically smaller than Task Authorizations, but do
not have a firm upper limit.
Project Role Assignments. In Project Role Assignments, the Consultant will provide a
suitability qualified professional to fulfill the particular role on a particular project.
Program Role Assignments. In Program Role Assignments, the Consultant will provide
a suitability qualified professional to fulfill the project role on a portfolio of projects.
Architecture
Design and oversee design by consultants of new building projects and tenant improvement
projects. Work with City Building/Planning Departments, Fire Departments and other regulatory
agencies as a liaison on behalf of OC San to ensure projects comply with permitting and code
requirements.
SCOPE OF WORK PSA2021-002
1505425.1
Page 2 of 10
Prepare more complex plan clarifications and changes in response to Contractor’s Request for
Information during construction and verify that facilities constructed meet design specifications
and regulatory requirements.
Engineering – Construction Management
Construction management activities include the following:
Perform a variety of work functions supporting the design and construction of
wastewater treatment and collection systems.
Review construction documents including plans and specifications; interpret plans and
specifications for construction work performed by OC San’s contractors; ensure
contractual compliance with plans, specifications, codes and safety requirements; verify
that materials being incorporated into project are per specification and with approved
construction practices; coordinate equipment isolations, equipment and process tie-ins.
Prepare progress payments to the contractor; review submittals for material and
equipment conformance to design specifications and plans.
Perform analysis of change orders; negotiate fair and reasonable costs for change
orders; prepare change order reports and documents for consideration by the Board of
Directors.
Oversee the start-up of facilities; participate in staff training.
Provide technical assistance and support to engineers and project managers; provide
technical training as appropriate.
Prepare a variety of administrative, technical, and budget reports, memos, letters, and
correspondence.
Perform constructability reviews.
Maintain comprehensive contractual records and periodically monitor progress of all
goods and service agreements, from inception through completion, to enforce
milestones, deliverables and post-contract warranties.
Engineering – Civil / Mechanical
Prepare detailed drawings, technical specifications, and scopes of work; review proposals;
assist OC San in the consultants’ selection process and perform construction support services.
Design or oversee design by consultants of sanitary sewers, sewer rehabilitation, mechanical
piping systems, wastewater treatment systems, reclaimed water systems, lift stations, etc.
including calculations. Lead design reviews to perform a comprehensive multi-discipline design
review on assigned projects.
Respond to engineering bid questions and addenda, respond to contractor’s request for
information during construction of facility, verify that equipment meets design specifications, and
prepare design changes.
SCOPE OF WORK PSA2021-002
1505425.1
Page 3 of 10
Engineering - Electrical
Provide electrical engineering services including design, design review, interdisciplinary review
of design documents, construction support service for wastewater treatment plant electrical
generating and distribution systems. Design and oversee design by consultants for medium
voltage and low voltage electrical distribution systems and motor control systems including
switchgear, single line diagrams, elementary diagrams, motor control schematics, short circuit
calculations, protective device coordination studies, raceway/wire design, and hazardous area
classification.
Respond to contractor’s request for information during construction of facility, verify that
equipment meets design specifications, and prepare design changes, review NETA test results,
and perform electrical system startup and commissioning for low and medium-voltage systems.
Perform short circuit calculations and protective device coordination studies utilizing ETAP
software.
Engineering - I&C
Provide instrumentation and control engineering services including design, design review,
interdisciplinary review of design documents, construction support service, and commissioning
support for wastewater treatment plant control systems. Design and oversee design by
consultants for process and instrumentation diagrams, control strategies, control system
network diagrams, control system input/output list, control panel drawings, and commissioning
procedures.
Respond to contractor’s request for information during construction of facility, verify that
equipment meets design specifications, prepare design changes, and support startup and
commissioning.
Engineering – Commissioning Coordinator
Provide technical leadership and management of the development of commissioning
procedures during design; review the proposed construction sequencing and commissioning
packages established during design; review finalized commissioning procedures during
construction; work closely and coordinate with the contractor’s commissioning coordinator;
provide oversight of the contractor’s commissioning and start-up process and coordinate
startups with operations and maintenance; coordinate OC San’s inspection, control system
programming and engineering resources to support the contractor’s commissioning process;
track outstanding commissioning items and support their resolution; and work closely with the
resident engineer to provide commissioning status and notification of any issues or concerns.
The commissioning coordinator shall have knowledge in electrical, instrumentation, control
systems and process control.
Engineering - Structural
Prepare detailed drawings, technical specifications, and scopes of work; review proposals and
technical memoranda prepared by others; prepare engineering analysis.
SCOPE OF WORK PSA2021-002
1505425.1
Page 4 of 10
Provide structural analysis as needed to recommend structural improvements to existing
facilities, analyze structural failures and recommend repairs.
Design and oversee design by consultants of structural systems for water/wastewater facilities.
Respond to structural Requests for Information and/or prepare more complex structural
engineering design changes during construction of facility and verify that equipment meets
design specifications and regulatory requirements.
Inspection
Inspection activities include the following:
Provide construction inspection for plant and collection facilities construction work
performed by contractors to ensure contractual compliance with plans, specifications,
codes, regulations, and OC San’s safety standards.
Prepare a variety of reports and documentation.
Review construction documents including plans and specifications.
Inspect plant and collection facilities construction work performed by contractors.
Verify that materials being incorporated into project are per specification and with
approved construction practices.
Coordinate equipment and process isolations, shutdowns, and tie-ins.
Assist safety representatives with job hazard analysis.
Observe contractors work safety environment and compliance with traffic control plans
and devices; work with contractor to establish and maintain a safe construction project
for employees, customers, and the public.
Document and follow-up on actions regarding safety, traffic control plans, and working
practices.
Assist in the maintenance of accurate as-built contract drawings
Verify contractor as-built drawings are maintained and correct.
Assist Resident Engineers on field change orders, plan clarifications, and plan changes.
Review and approve final drawings for the preparation of record drawings.
Prepare and maintain necessary construction inspection records and reports as a means
of formal documentation including daily inspection reports, photo-logs, field test results,
force account reports, extra work requests, project submittal files, and individual project
logs.
Assist Resident Engineer in preparing monthly progress reports.
Attend construction meetings.
SCOPE OF WORK PSA2021-002
1505425.1
Page 5 of 10
Work with contractors, regulatory agencies, utilities, city officials and the general public
throughout construction project to coordinate work to be accomplished and ensure
satisfactory project completion with minimum impact on the public or OC San facilities.
Various disciplines may need continuous construction inspection including Civil, Structural,
Pipeline, Mechanical, Electrical and Instrumentation disciplines of large complex water
treatment facilities and rehabilitation.
Project Management
Project management functions for major capital projects include developing schedules, cost
estimates and staffing requirements; assembling and leading project teams; planning, directing,
and coordinating activities of projects to ensure that goals and objectives of projects are
accomplished on schedule and within prescribed budget; inspecting quality and quantity of
work; managing the selection of outside consultants; and preparing and presenting reports and
other necessary correspondence on assigned projects.
Manage a project or group of projects through all six phases of the Engineering Project Life
Cycle, including project development, preliminary design, construction and installation,
commissioning, and closeout.
Manage, direct, and coordinate activities of the project team to ensure project progresses on
schedule within prescribed budget, and with acceptable quality; confers with project team to
provide technical advice and resolve problems; conducts project team meetings to ensure
adequate communication of project status.
Perform periodic review of work assignments to ensure that the work is satisfactory and is
completed according to plan.
Interface with senior management, the Board of Directors, peers, project staff, consultants,
customers, and users as necessary to coordinate project execution; informs stakeholders of
project status and possible outcomes.
Prepare project reports for the Board of Directors, management, and others; makes
presentations as necessary.
Provides project management oversight of the selection process of outside consultants;
oversees the bid, proposal, and selection/purchase recommendation process for major capital
projects; solicits proposals; reviews proposals; assists OC San’s evaluation teams with selection
of consultants establishes schedules and performance criteria.
Work with consultants on project planning, preparation, scheduling, and execution of contracts;
ensures work is completed on time and in conformance with plans and specifications.
Apply project management tools as required to address the financial aspects and impacts of
project variables such as delays to the project schedule.
Serve as a liaison for the Engineering Department with other OC San departments, divisions,
and outside agencies; provide project representation to commissions, committees, and task
forces.
SCOPE OF WORK PSA2021-002
1505425.1
Page 6 of 10
Support – Administrative
Administrative support activities include the following:
Perform a variety of secretarial, advanced clerical, and routine administrative and
programmatic work in support of assigned projects or programs, division, or department.
Participate in the administration of approved policies and procedures.
Prepare financial analysis and a variety of reports as required.
Provide information and assistance to other assigned project or program staff regarding
assigned programs, policies and procedures.
Support – Cost Estimating
Cost estimating activities include the following:
Prepare cost estimates to provide detailed information regarding quantity and cost of
materials and labor.
Develop processes and/or techniques that provide clear and standard estimating
methods across projects.
Provide data for analytical comparisons between projects.
With estimating process, identify project cost changes as projects advance through the
design process.
Review engineering plans and specifications to determine materials and quantities
required by project specifications.
Recommend cost saving changes.
Review cost estimates and change orders submitted by construction contractors and
provide recommendations.
Provide data for analytical comparisons between projects.
Prepare general budget estimates for new projects.
Estimating shall include all disciplines including architectural, civil, structural, mechanical,
plumbing, heating and air conditioning, fire protection, electrical and control systems.
Support – Construction Scheduling
Perform a variety of scheduling review and analyses involving wastewater treatment and
collection systems, including the following activities:
Review design submittals prior to bid to ensure scope is achievable in the time
stipulated.
Establish clear specifications and enforcement provisions with the contractors by placing
schedule performance and proof of impact on the contractors.
SCOPE OF WORK PSA2021-002
1505425.1
Page 7 of 10
Review construction contractor’s schedules for effective contractor performance.
Review baseline schedule submittals.
Support the Resident Engineer (RE) and Project Manager (PM) during scheduling
meetings so they are effective and productive.
Maintain careful documentation of all schedule submittals so that any requests for time
adjustments can be measured against the approved schedule in place at the time of
impact is claimed.
Monitor actual progress versus planned progress. Provide exception reporting and
recommend actions.
Perform analysis of change orders such as time impact analysis (TIA) and productivity
claims.
Support – Construction Claims / Mitigation
Prepare detailed analysis of contractor-submitted requests for change, delay claims, time
impact analyses (TIA) and/or government code claims including productivity loss claims, claims
for differing site conditions, and/or total cost claims. Work may include analysis of liability,
review of contract language and supporting documents, validating extended overhead costs,
and review and analysis of any other supporting documentation.
Work may also include a proactive strategy to reduce exposure, review of reporting
requirements and practices, and conferring with project teams and/or managers to effectively
implement practices to reduce liability and/or risk.
Support – CAD Drafting and Design
CAD drafting and design support include the following activities:
Use Computer Aided Design (CAD) equipment to provide support to Engineers by
preparing layouts, detail drawings, sketches and diagrams. Drawings are to include all
views and dimensions necessary for construction of wastewater treatment and collection
systems. Work shall be compliant with OC San CAD Manual.
Draft engineering drawings of proposed wastewater treatment facility construction
projects from engineer’s design drawings, including structures and notations; review
maps and existing drawings to determine utility locations, elevations and other related
information.
Consolidate changes made on drawings by consultants, engineers and inspectors with
contractor’s as-built drawings to draft final record drawings on a wide variety of
wastewater treatment facility construction projects.
Conduct field visits to confirm existing conditions and finished construction configuration.
Make appropriate notes of sizes, diameters, locations and other significant information
and return to project engineer.
Provide technical assistance and support to engineers and engineering aides.
SCOPE OF WORK PSA2021-002
1505425.1
Page 8 of 10
IV. TASK ASSIGNMENTS
OC San will authorize specific tasks to be completed by CONSULTANT. These tasks will vary
widely in size, cost, and complexity. Tasks will be authorized as either a Task Authorization or a
Task Directive, as described in Attachment “A1” – Rules of Engagement.
V. PERSONNEL ASSIGNMENTS
OC San will require CONSULTANT to provide staff to fill specific roles on specific projects, and,
in some cases, for its Engineering Program, as described in Attachment “A1” – Rules of
Engagement.
Project Role Assignments
Project Role assignments involve CONSULTANT assigning a qualified individual or individuals
to fill a particular role on a particular project.
A project role may cover the entire role for the project, or a specifically designated portion of that
role. CONSULTANT shall identify a Technical Lead to support assigned staff in their
designated role. Project direction, however, will generally come from the Project Team and
Supervision in Engineering.
Program Role Assignments
Program Role assignments direct CONSULTANT to assign a qualified individual or individuals
to fill a particular role on an entire portfolio of projects.
Personnel Authorizations
Personnel Authorizations authorize a particular individual to work on Task Directives, Project
Roles, and Program Roles.
VI. LOGISTICS AND CONTRACT MANAGEMENT
Work Location
CONSULTANT’s on-site staff shall be located at OC San’s facilities in Fountain Valley or
Huntington Beach, California. At times, work may be required at other OC San facilities or at job
site locations away from OC San facilities. At the CONSULTANT’s discretion and concurrence
with the OC San representative, the assigned CONSULTANT staff may be located at
CONSULTANT’s home office. Advanced coordination with OC San may be required for
CONSULTANT staff working at OC San facilities on OC San holidays.
Point of Contact/Supervision
CONSULTANT shall designate an individual as the single point of contact to direct efforts in
fulfilling contracted obligations under this Agreement. The selected designee shall be
responsible for the direct supervision of assigned staff, including such activities as work
SCOPE OF WORK PSA2021-002
1505425.1
Page 9 of 10
schedules, quality of work performed, technical oversight, vacation requests, discipline, etc. The
selected designee shall not be changed without prior written notification to the OC San
representative.
CONSULTANT is responsible for supervision of its entire staff, including the requirements
defined in Attachment “A1” – Rules of Engagement:
OC San Project Document Management
CONSULTANT’s staff assigned to work on OC San projects shall save project related
deliverables, documents and/or records in OC San accessible locations i.e., OC San SharePoint
servers and/or OC San licensed cloud-based applications such as Bluebeam, PMWeb or One
Drive, as applicable to the project assignment, to comply with Public Records Act requirements.
Accessibility to these locations shall be provided by OC San.
Provided Facilities & Equipment
OC San will provide the following for CONSULTANT’s on-site staff:
Furnished office space at OC San
Computers, software, network, and printing capabilities
Office telephone
Personal Protective Equipment
CONSULTANT staff assigned to OC San facilities may be exposed to known plant process and
work hazards and therefore will be required to have appropriate Personal Protective Equipment
(PPE) such as: eye and face protection (safety glasses), head protection (hard hat), hand
protection (gloves), foot protection (safety toed shoes), high visibility clothing (Class 3 vests),
hearing protection, personal gas monitor (4 gas), fall protection (harness and lanyard) and other
forms of PPE. CONSULTANT shall provide all equipment and training necessary to comply with
OC San safety polices. Refer to Contractor Safety Standards – Attachment “K”.
Time Tracking & Invoicing
CONSULTANT shall submit invoices, including cost and hours, on a monthly basis. Invoice
shall be submitted no later than the 15th of each month. OC San maintains a project controls
system containing detailed cost and hours information for all Engineering Projects. The format
for reporting hours shall be in an importable format, such as Microsoft Excel, and contain, at a
minimum, the following items:
Column Description
Project Number OC San will provide a list of project numbers. These numbers are
subject to change as new projects are added and existing projects are
completed.
SCOPE OF WORK PSA2021-002
1505425.1
Page 10 of 10
Work Package
Number
OC San will provide a list of work package numbers. The work
package numbers are subject to change as a project transitions from
one phase to the next.
Employee ID Each employee included in the hours report must contain a unique
identification number.
Employee Name Employee name.
Work Date The week ending date when work was performed.
Hours by Week The total number of hours worked for the week. In addition, it may be
necessary to report overtime hours which will require a separate
report.
Total Burdened Cost The total burdened cost shall include actual salary, fringe costs,
overhead, and profit by person.
Work Quality
CONSULTANT shall be responsible for the professional quality and technical competence of
assigned staff supplied to OC San. Additionally, the firm shall be responsible for the
coordination of all efforts and other services furnished under the agreement.
Management of Resource Assignments
OC San will maintain a cloud-based workflow tool to request, review, authorize, and close
resource assignments. That workflow tool is currently PMWeb. CONSULTANT’s Point of
Contact will be required to utilize this tool to track all requests through their life cycles. OC San
will use this workflow tool to verify that any invoiced costs have been duly approved through the
workflow tool.
Rules of Engagement PSA2021-002
Page 1 of 4
ATTACHMENT A1
RULES OF ENGAGEMENT
This document describes options for OC San to utilize a Supplemental Engineering
Services (SES) agreement to maintain the Engineering Project program while
complying with Independent Contractor expectations.
There are four mechanisms by which professional services can be supplied through the
SES agreement:
Task Authorizations
Task Directives
Project Role Assignments
Program Role Assignments
Task Directives, Project Role Assignments, and Program Role assignments require that
anyone working under the mechanism also have an approved Personnel Authorization.
These Terms of Engagement are intended to document how services are to be
requested, authorized, and managed.
Task Authorizations
Task Authorizations have a formal scope of work, and a fixed upper limit. Distinguishing
aspects of Task Authorizations include the following:
Requests for Task Authorization Proposals (RFTAPs) require a scope of work
prepared by OC San staff.
RFTAPs and Task Authorizations must be approved by the Director of
Engineering (DOE).
The scope of work should have the same level of detail as used for a Design
Task Order or Planning Study Task Order, including schedule requirements,
task, deliverables, and assumptions.
Task Authorization must specify a firm negotiated upper limit which may not be
exceeded. If changes require a revision to that upper limit, it must be processed
as a formal Task Authorization Amendment prior to the work being authorized
and performed.
The SES Consultant shall report costs incurred for the Task Authorization in their
monthly invoices, with the total costs incurred to date, and the unused budget
remaining.
The SES Consultant may use any of their staff, whether they have an approved
Personnel Authorization or not.
The time that SES Consultant staff charge to Task Authorizations does not count
against their approved number of hours for Personnel Authorizations.
Rules of Engagement PSA2021-002
Page 2 of 4
Task Directives
Task Directives also have an explicit scope of work, but the level of detail may be lower.
Task Directives need a negotiated budgetary estimate, but it is not a firm upper limit.
The scope of work for Task Directives may be less detailed than what is required
for a Task Authorization.
A schedule to complete the work should generally be specified but is not always
required.
Costs are tracked separately on invoices.
Personnel Authorizations are required for any staff working on a Task Directive.
Project Role
Project Role assignments direct the SES Consultant to assign a qualified individual or
individuals to fill a particular role on a particular project. Standard project roles are
listed below:
Admin Support
Construction Support
Electrical Engineer
Estimator
I&C Engineer
Inspection Civil - Mech
Inspection Elec - I&C
Project Engineer
Project Manager
Resident Engineer
Submittals Group
A project role may cover the entire role for the project, or a specifically designated
portion of that role. When a role is limited, the description of the specific designation
shall be included in the Resource Assignment Request.
The timing of delivery is based on the project schedule, or the specific
designation.
SES Staff designated on an approved Project Role assignment shall work
directly with other project team members (OC San or SES).
The Resource Assignment request shall indicate the anticipated fraction of a full-
time equivalent the role is anticipated to take.
Personnel Authorizations are required for any Project Role assignments.
Time spent in a Project Role counts against Personnel Authorizations.
The SES Consultant shall identify a Technical Lead to support assigned SES
Staff member in their designated role. Project direction, however, will generally
come from the Project Team and Supervision in Engineering.
Rules of Engagement PSA2021-002
Page 3 of 4
Program Role
Program Role assignments direct the SES Consultant to assign a qualified individual or
individuals to fill a particular role on an entire portfolio of projects. Program role
assignments are intended to be used in two circumstances:
When OC San has no staff with the required qualification. An example of this is
structural engineering.
When a pool of qualified individuals is required, with assignments and timing
varying from day to day. This case applies specifically to inspection. In the case
of inspection, the SES Consultant shall designate a dispatcher, with whom OC
San’s Inspection Supervisor can coordinate assignments and schedules. The
dispatcher may be one of the assigned inspectors, the SES Point of Contact, or
another appropriate representative of the SES Consultant.
The following apply to Program Roles:
Program Role assignments will generally be made before the specific need
arises.
Only supervisors or managers may initiate a Program Role request.
Project Role assignments must be approved by the Engineering Manager
responsible for the function.
Personnel Authorizations are required for any Program Role assignments.
Time spent in a Program Role counts against Personnel Authorizations.
Personnel Authorizations
Personnel authorizations (PA’s) provide the DOE’s approval for a particular individual to
work on Task Directives, Project Roles, and Program Roles. They also designate the
following:
The Project Role.
Their location as either Home Office or Site. This impacts the overhead rate to
be used for billing.
The number of hours per week, or just a set number of hours as needed.
The total bill rate, including actual salary, overhead, and profit.
Any reimbursable expenses. This is typically used when travel is required or
when a staff member needs a vehicle assigned to them due to the nature of their
assignments.
The following apply to Personnel Authorization:
They require approval by the DOE.
They are specific to one person.
They need not be project specific.
For on-site PA’s, the PA authorizes office space, key cards, an OC San phone
extension, and network access.
Rules of Engagement PSA2021-002
Page 4 of 4
Staff Supervision
The SES Consultant is responsible for supervision of its entire staff, including the
following:
Administrative Supervision (SES Consultant staff only)
o Performance Reviews
o Timecard Approvals o Work Hours
Supervision of Assigned Scope Deliverables
o Work Prioritization
o Technical input, guidance, and direction
Quality Control for
o Task Authorizations.
o Task Directives, when Quality Control is specified in the scope of work.
OC San will not be responsible for supervision of SES Consultant staff. OC San will
however provide direction as an Owner. Examples include the following:
Project decisions and priorities
Design standards
OC San’s preferences
Financial considerations
Risk considerations
Review for compliance with OC San Policies and Procedures
Coordination with other OC San projects and activities
3/29/2022
1
Supplemental Engineering Services
Contract No. PSA2021‐002
Presented by:
Jeff Mohr
Engineering
Manager
Operations
Committee
April 6, 2022
2
144 146
138
145 141
134 129
120 115
106
92
0
20
40
60
80
100
120
140
160
22‐23 23‐24 24‐25 25‐26 26‐27 27‐28 28‐29 29‐30 30‐31 31‐32 32‐33
Fiscal Year
99 Authorized
5‐yr CIP $1.5 billion
Forecasted Engineering Workload
1
2
r-----------------~, I I
I I ·-----------------;
3/29/2022
2
•Task Assignments
•Specific scope and deliverables
•Project Roles
•Fills a specific role on a specific project
•Program Roles
•Provide disciplines OC San does not have
Consultants may not pursue other OC San work
during the term of the agreement
Supplemental Services
3
•Consultants propose teams for resource requests
•Staff chooses firm with most appropriate staff
•Intent is to distribute work evenly
•Each contract limit is based on 60% of forecasted
work
Rules of engagement ensures consultant staff work
as independent contractors
Resource Requests
4
3
4
3/29/2022
3
Selection Process
Proposal
Score
Score after
Interview
Jacobs Project Management 94 95
AECOM Technical Services 73 76
WSP USA, Inc. 62 54
Key Attributes –Jacobs
•Exceptional staff
•Effective approach for
managing resource requests
•Highly effective on current
contract
Key Attributes –AECOM
•Deep bench of professionals
•Experience with similar contracts
•Good approach for staff
supervision
5
Recommend to the Board of Directors to:
Approve Professional Services Agreements to provide
Supplemental Engineering Services, Contract No.
PSA2021‐002, for a three‐year period commencing
May 1, 2022, through April 30, 2025, with two one‐year
renewal options, for an amount not to exceed
$29,700,000 per individual agreement with the
following two firms:
•AECOM Technical Services, Inc.
•Jacobs Project Management Co.
Recommendation
6
5
6
l
3/29/2022
4
Questions
?
7
7
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2022-2116 Agenda Date:4/6/2022 Agenda Item No:7.
FROM:James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
PROFESSIONAL PROGRAMMING SERVICES, CONTRACT NO. PSA2021-001
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Recommend to the Board of Directors to:
Approve Professional Services Agreements to provide Professional Programming Services, Contract
No. PSA2021-001, for a three-year period commencing May 1, 2022, through April 30, 2025, with two
one-year renewal options, for an amount not to exceed $4,900,000 per individual agreement with the
following two firms:
·Enterprise Automation
·Maverick Technologies
BACKGROUND
Orange County Sanitation District’s (OC San) Engineering Department includes the Process Control
Integration (PCI) Group which maintains, programs, tests, and commissions the process and
electrical control systems for the plants and pump stations. The PCI Group includes 11 staff
positions and one engineering supervisor. OC San anticipates a Capital Improvement Program (CIP)
of approximately $1.5 billion from July 2022 through June 2027. As part of its project management,
the Engineering Department forecasts monthly staffing levels for PCI needed over time to deliver the
program.
The existing process control system uses obsolete software for the human-machine interface (HMI)
and enterprise historian. In July 2021, the Board awarded a contract to ABB for Process Control
Systems Upgrades, Project No. J-120. A dedicated team from the PCI Group will be required to
support this replacement through October 2025.
RELEVANT STANDARDS
·Ensure the public’s money is wisely spent
·1, 5, 20-year planning horizons
·California Government Code §4526: Select the “best qualified firm” and “negotiate fair and
equitable fees”
Orange County Sanitation District Printed on 3/29/2022Page 1 of 4
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
File #:2022-2116 Agenda Date:4/6/2022 Agenda Item No:7.
PROBLEM
Based on the most current projections,the PCI Group’s workload will exceed the number of PCI staff
available by approximately four full-time positions.
PROPOSED SOLUTION
Approve two Professional Services Agreements to provide Professional Programming Services for up
to a five-year period ending in April 2027.
To ensure that projects are completed on time,OC San will utilize professional programming services
agreements to program,test,commission,maintain,upgrade,and configure programmable logic
controllers, HMI graphics, databases, servers, and networks for select projects.
The benefits of this approach,as opposed to hiring full-time staff or limited-term employees,include
the ability to provide the needed short-term resources during the execution of Project No.J-120,
rapid mobilization of highly skilled technical resources,flexibility to change the mix of needed
resources to match project requirements,and the ability to increase or reduce project resources as
workloads change.
When OC San identifies the need for programming professional resources,the two firms will be
requested to propose on a task.OC San will then select the most appropriate team for the task and
negotiate the budget and schedule.
TIMING CONCERNS
The professional programming services will enable OC San to properly execute the proposed CIP
over the next five years.
RAMIFICATIONS OF NOT TAKING ACTION
Without the necessary programing resources,projects will have to be delayed,resulting in impacts to
the capital improvement program.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
Firm Selection:
OC San requested and advertised for proposals for Professional Programming Services,Contract
No.PSA2021-001,on September 27,2021.The following evaluation criteria were described in the
Request for Proposals (RFP) and used to determine the most qualified firms.
Criterion Weight
Project Understanding and Approach 25%
Related Project Experience 30%
Project Team and Staff Qualifications 45%
Orange County Sanitation District Printed on 3/29/2022Page 2 of 4
powered by Legistar™
File #:2022-2116 Agenda Date:4/6/2022 Agenda Item No:7.
Criterion Weight
Project Understanding and Approach 25%
Related Project Experience 30%
Project Team and Staff Qualifications 45%
Four proposals were received on November 9,2021 and evaluated in accordance with the evaluation
process set forth in OC San’s Purchasing Ordinance by a pre-selected Evaluation Team consisting of
OC San staff that included one Engineering Manager,one Engineering Supervisor and one Senior
Engineer.The Evaluation Team also included one non-voting representative from the Contracts
Administration Division.
The Evaluation Team scored the proposals on the established criteria as summarized in the table
below:
Firm Project
Understanding
and Approach
(Max. 25 Points)
Related
Project
Experience
(Max. 30
Points)
Project Team and
Staff
Qualifications
(Max. 45 Points)
Total
Score
(Max. 100
Points)
1 Enterprise Automation 20 25 39 84
2 Maverick Technologies 18 19 33 70
3 South Coast Controls 14 16 21 51
4 Techne Network Inc.4 8 9 21
Of the four proposals,only those from Enterprise Automation and Maverick Technologies offered
sufficient local resources.Based on this scoring,interviews with these two firms were conducted on
January 11 and 12,2022.Following the interviews,each member of the Evaluation Team scored the
firms based on both the written proposal and the interview using the evaluation criteria and weighting
described above. Below is the summary of the final scores.
Firm Project
Understanding
and Approach
(Max. 25 Points)
Related
Project
Experience
(Max. 30
Points)
Project Team
and Staff
Qualifications
(Max. 45 Points)
Total
Score (Max.
100 Points)
1 Enterprise Automation 23 25 41 89
2 Maverick Technologies 19 19 35 73
Enterprise Automation and Maverick Technologies demonstrated strong experience,knowledge,and
ability to provide these services;clear understanding of projects risks,project execution and
understanding on how to deliver a quality product on time and within schedule;and ability to provide
local resources to perform programming, testing, and commissioning.
Orange County Sanitation District Printed on 3/29/2022Page 3 of 4
powered by Legistar™
File #:2022-2116 Agenda Date:4/6/2022 Agenda Item No:7.
Review of Fee Proposals and Negotiations:
Hourly rate schedules were provided from each firm with a letter from the firm’s officer stating that the
rates provided to OC San were the same standard rates provided to other new clients.OC San also
reviewed the rates and determined that they were fair and reasonable.
Contract Value:
Staff has estimated that,on average,the equivalent of approximately four full-time staff will be
required over the maximum 5-year period of these contracts.Assignments will be made on a case-
by-case basis,so fees earned by one firm could be more than the other firm.For this reason,staff is
proposing the contract limit for each firm be approximately 60 percent of the total expected fees
associated with the four full-time equivalents.
CEQA
N/A
FINANCIAL CONSIDERATIONS
This request complies with authority levels of OC San’s Purchasing Ordinance.The budgeted cost
for the proposed Professional Service Agreements is contained within the approved CIP project
budgets for project programming and commissioning and the Division 760 budget for control system
maintenance, and therefore no additional funding is necessary.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Draft Professional Services Agreement
·Presentation
MD:jw
Orange County Sanitation District Printed on 3/29/2022Page 4 of 4
powered by Legistar™
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 1 of 17
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT, is made and entered into to be effective the «EffectiveDate» day of «EffectiveMonth», «Year», by and between the ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to as "OC SAN", and «Company», for purposes of this AGREEMENT
hereinafter referred to as "CONSULTANT". OC SAN and CONSULTANT are referred to herein collectively as the "Parties" or individually as a "Party." WITNESSETH: WHEREAS, OC SAN desires to engage a consultant for Programming Professional Services, PSA2021-001, to provide qualified staff as described in Attachment “A”, Scope of Work; and Attachment “A1”, Rules of Engagement, and, WHEREAS, CONSULTANT is qualified to provide the necessary services in connection with these requirements and has agreed to provide the requisite personnel and experience, and is capable of performing such services; and, WHEREAS, OC SAN has adopted procedures for the selection of professional services
and has proceeded in accordance with said procedures to select a CONSULTANT to perform this work; and,
WHEREAS, OC SAN shall manage selection of a Consultant for Task Order(s) and Task Directive(s) when requested after award of this AGREEMENT based on the most appropriate qualifications and fit; and, WHEREAS, at its regular meeting on «BoardMeetingDate» the Board of Directors, by Minute Order, accepted the recommendation of the Operations Committee to approve this AGREEMENT between OC SAN and CONSULTANT. NOW, THEREFORE, in consideration of the promises and mutual benefits, which will result to the parties in carrying out the terms of this AGREEMENT, it is mutually agreed as follows:
1. SCOPE OF WORK
CONSULTANT agrees to furnish necessary qualified staff to accomplish the Scope of Work attached hereto as "Attachment A". Attachment “A” is hereby incorporated into this
AGREEMENT. In the event of a conflict between the Scope of Work and this AGREEMENT, the terms of this AGREEMENT shall prevail.
2. COMPENSATION
Total compensation shall be paid to CONSULTANT for services in accordance with the following provisions:
-
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 2 of 17
A. Time and Material: Not to Exceed Aggregate Amount
OC SAN shall compensate CONSULTANT for services performed under this AGREEMENT on a time and materials basis, not to exceed a maximum aggregate amount of «Grand Total Written Amount» Dollars ($«Grand Total
Amount») (“Total Compensation”) during the term of the AGREEMENT.
B. Hourly Rates As a portion of the total compensation to be paid to CONSULTANT, OC SAN shall pay to CONSULTANT a sum equal to the burdened salaries (salaries plus
benefits, overhead, and profit) actually paid by CONSULTANT charged on an hourly-rate basis and paid to the personnel of CONSULTANT per Attachment “E”. OC SAN shall also pay to CONSULTANT a sum equal to the premium costs for overtime, charged on an hourly-rate basis, actually paid by CONSULTANT to the non-exempt personnel of CONSULTANT plus profit. Premium costs for overtime will not include fringe and overhead. Attachment “E” is hereby incorporated by reference. Upon request of OC SAN, CONSULTANT shall provide OC SAN with certified payroll records of all employees’ work that is charged to this AGREEMENT.
C. Overhead Rates “Field Staff” are defined as project-assigned staff by CONSULTANT, working at OC SAN’s facilities for a project-assigned period exceeding ninety (90) continuous calendar days. The overhead rates for Field Office Staff are included in Attachment “E”. “Home Office Staff” are defined as staff assigned by CONSULTANT, supporting
the project-assigned work, either by working at CONSULTANT’s or Subconsultant’s offices or at OC SAN’s site for periods less than ninety (90) continuous calendar days. The overhead rates for Home Office Staff are included
in Attachment “E”.
D. Profit
Profit for CONSULTANT and Subconsultants shall be five percent (5%). Addenda shall be governed by the same maximum Profit percentage. As a portion of the total compensation to be paid to CONSULTANT and Subconsultants, OC SAN shall pay profit for all services rendered by CONSULTANT and Subconsultants for this AGREEMENT.
E. Subconsultants
For all Subconsultants, CONSULTANT may pay to Subconsultants total compensation on an hourly-rate basis per Attachment “E” – Fee Proposal Form and as specified in the Scope of Work. OC SAN shall pay to CONSULTANT the
actual costs of Subconsultants, without markup.
-
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 3 of 17
F. Escalation
For purposes of calculating hourly billing rates of CONSULTANT employees and any Subconsultant employees performing services under this AGREEMENT, the Maximum Hourly Rate as defined in Attachment “E” shall be adjusted annually
based on the Employment Cost Index (ECI) of Los Angeles-Long Beach-Riverside, California as of July 1 of each year. This rate is from the United States Department of Labor Bureau of Labor Statistics. The annual adjustments shall not exceed three percent (3%).
G. Reimbursable Direct Costs
OC SAN will reimburse the CONSULTANT for reasonable travel and business expenses as described in this section and further described in Attachment “D” - Allowable Direct Costs to this AGREEMENT. The reimbursement of the above mentioned expenses will be based on an “accountable plan” as considered by Internal Revenue Service (IRS). The plan includes a combination of
reimbursements based upon receipts and a “per diem” component approved by IRS. The most recent schedule of the per diem rates utilized by OC SAN can be found on the U.S. General Service Administration website at http://www.gsa.gov/portal/category/104711#. The CONSULTANT shall be responsible for the most economical and practical
means or management of reimbursable costs inclusive but not limited to travel, lodging and meals arrangements. OC SAN shall apply the most economic and practical method of reimbursement which may include reimbursements based upon receipts and/or “per diem” as deemed the most practical. CONSULTANT shall be responsible for returning to OC SAN any excess reimbursements after the reimbursement has been paid by OC SAN.
Travel and travel arrangements – Any travel involving airfare, overnight stays or multiple day attendance must be approved by OC SAN in advance.
Local Travel is considered travel by the CONSULTANT within OC SAN geographical area which includes Orange, Los Angeles, Ventura, San Bernardino, Riverside, San Diego, Imperial and Kern Counties. Automobile mileage is reimbursable if CONSULTANT is required to utilize personal vehicle for local travel.
Lodging – Overnight stays will not be approved by OC SAN for local travel. However, under certain circumstances overnight stay may be allowed at the discretion of OC SAN based on reasonableness of meeting schedules and the amount of time required for travel by the CONSULTANT. Such determination will be made on a case-by-case basis and at the discretion of OC SAN. Travel Meals – Per-diem rates as approved by IRS shall be utilized for travel meals reimbursements. Per diem rates shall be applied to meals that are
appropriate for travel times. Receipts are not required for the approved meals.
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 4 of 17
Additional details related to the reimbursement of the allowable direct costs are provided in the Attachment “D” - Allowable Direct Costs of this AGREEMENT.
OC SAN shall also pay to CONSULTANT actual costs for equipment rentals, leases or purchases with prior approval of OC SAN.
OC SAN will not pay per diem for Field Office Staff nor will it pay for any relocation of staff to be assigned under this AGREEMENT.
H. Limitation of Costs If, at any time, CONSULTANT estimates the cost of performing the services described in CONSULTANT’s Task Authorizations will exceed seventy-five percent (75%) of the not-to-exceed amount of the Task Authorization, CONSULTANT shall notify OC SAN immediately, and in writing. This written notice shall indicate the additional amount necessary to complete the services. Any cost incurred in excess of the approved not-to-exceed amount, without the
express written consent of OC SAN’s authorized representative shall be at CONSULTANT’s own risk. This written notice shall be provided separately from, and in addition to any notification requirements contained in the CONSULTANT’s
invoice and monthly progress report. Failure to notify OC SAN that the services cannot be completed within the authorized not-to-exceed amount is a material breach of this AGREEMENT.
3. REALLOCATION OF TOTAL COMPENSATION
OC SAN, by its Director of Engineering, shall have the right to approve a reallocation of the incremental amounts constituting the Total Compensation, provided that the Total Compensation is not increased.
4. KEY POSITIONS
CONSULTANT shall notify OC SAN in advance changes to any key CONSULTANT employees performing services under this AGREEMENT. Positions considered to be Key Positions are Point of Contact and any staff leading Task Authorizations and Task
Directives under the AGREEMENT. Should a CONSULTANT employee within one of these categories become no longer available to OC SAN, CONSULTANT shall submit the resume and qualifications of the proposed replacement to OC SAN for approval as
soon as possible, but in no event later than seven (7) calendar days prior to the departure of the incumbent Key Position unless CONSULTANT is not provided with such notice by the departing staff.
5. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed breakdown of costs associated with the performance of any work for that invoicing period, in a format acceptable to OC SAN. CONSULTANT shall warrant and certify the accuracy of these costs and provide all support documentation required by OC SAN. CONSULTANT understands that submitted costs are subject to Section 14 Audit Provisions.
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 5 of 17
B. Upon receipt of a properly prepared invoice, as described above, payment shall be made by OC SAN to CONSULTANT within sixty (60) calendar days.
C. Upon satisfactory completion of the work performed hereunder and prior to final payment under this AGREEMENT for such work, or prior settlement upon
termination of this AGREEMENT, and as a condition precedent thereto, CONSULTANT shall execute and deliver to OC SAN a release of all claims against OC SAN arising under or by virtue of this AGREEMENT other than such claims, if any, as may be specifically exempted by CONSULTANT from the operation of the release in stated amounts to be set forth therein.
D. Pursuant to the California False Claims Act (Government Code sections 12650-12655), any CONSULTANT that knowingly submits a false claim to OC SAN for compensation under the terms of this AGREEMENT may be held liable for treble damages and up to a $10,000 civil penalty for each false claim submitted. This section shall also be binding on all Subconsultants.
A CONSULTANT or Subconsultant shall be deemed to have submitted a false
claim when the CONSULTANT or Subconsultant: (a) knowingly presents or causes to be presented to an officer or employee of OC SAN a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be
made or used a false record or statement to get a false claim paid or approved by OC SAN; (c) conspires to defraud OC SAN by getting a false claim allowed or paid by OC SAN; (d) knowingly makes, uses, or causes to be made or used a
false record or statement to conceal, avoid, or decrease an obligation to OC SAN; or (e) is a beneficiary of an inadvertent submission of a false claim to OC SAN, and fails to disclose the false claim to OC SAN within a reasonable time after discovery of the false claim.
6. TERM
This AGREEMENT shall commence upon the effective date first written above, and shall continue in full force and effect through «Date», (“Initial Term”) unless earlier terminated or extended as provided in the AGREEMENT. OC SAN, at its sole discretion, may elect to extend the term of this AGREEMENT up to an additional twelve (12) months, commencing «Date», and continuing through «Date», (“Option Term 1”), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A”, entitled “Scope of Work” and Attachment “A1”, entitled “Rules of Engagement”.
OC SAN, at its sole discretion, may elect to extend the term of this AGREEMENT up to
an additional twelve (12) months, commencing «Date», and continuing through «Date», (“Option Term 2”), and thereupon require CONSULTANT to continue to provide services, and otherwise perform, in accordance with Attachment “A”, entitled “Scope of Work”
and Attachment “A1”, entitled “Rules of Engagement”.
OC SAN’s election to extend the AGREEMENT beyond the Initial Term shall not diminish its right to terminate the AGREEMENT for OC SAN’s convenience or CONSULTANT’s default as provided elsewhere in this AGREEMENT. The “maximum term” of this AGREEMENT shall be from the effective date first written above through «Date», which period encompasses the Initial Term and two (2) Option Terms.
- -
- -
-
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 6 of 17
7. PREVAILING WAGES
To the extent CONSULTANT intends to utilize employees who will perform work during
the contract, as more specifically defined under Labor Code Section 1720, CONSULTANT shall be subject to prevailing wage requirements with respect to such employees.
8. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION AND RECORD OF WAGES
A. To the extent CONSULTANT’s employees and/or Subconsultants who will perform Work during the design and preconstruction phases of a construction contract for which Prevailing Wage Determinations have been issued by the DIR
and as more specifically defined under Labor Code Section 1720 et seq, CONSULTANT and Subconsultants shall comply with the registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section 1771.4, the Work is subject to compliance monitoring and enforcement by the DIR.
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records
and shall comply with all the provisions of Labor Code Section 1776, and shall submit payroll records to the Labor Commissioner pursuant to Labor Code Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may be deducted from progress payments per Section 1776.
C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants shall furnish a copy of all certified payroll records to OC SAN and/or general public upon request, provided the public request is made through OC SAN, the Division of Apprenticeship Standards or the Division of Labor Enforcement of the Department of Industrial Relations.
D. The CONSULTANT and Subconsultants shall comply with the job site notices posting requirements established by the Labor Commissioner per Title 8,
California Code of Regulations Section 16461(e).
9. INDEPENDENT CONTRACTOR
The CONSULTANT and Subconsultants shall be independent contractors and not
agents of OC SAN. Any provisions of this AGREEMENT that may appear to give OC SAN the right to direct the CONSULTANT concerning the details of performing the professional services, or to exercise any control over such performance, shall mean only
that the CONSULTANT shall follow the direction of OC SAN concerning the end results of the performance.
10. DOCUMENT OWNERSHIP – CONSULTANT PERFORMANCE
A. Ownership of Documents for the Professional Services performed.
All documents in all forms (electronic, paper, etc.), including, but not limited to, studies, sketches, drawings, computer printouts, disk files, and electronic copies
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 7 of 17
prepared in connection with or related to the Scope of Work or Professional Services, shall be the property of OC SAN. OC SAN’s ownership of these
documents includes use of, reproduction or reuse of and all incidental rights, whether or not the work for which they were prepared has been performed.
OC SAN ownership entitlement arises upon payment or any partial payment for
work performed and includes ownership of any and all work product completed prior to that payment. This Section shall apply whether the CONSULTANT’s Professional Services are terminated: a) by the completion of the AGREEMENT, or b) in accordance with other provisions of this AGREEMENT. Notwithstanding any other provision of this paragraph or AGREEMENT, the CONSULTANT shall have the right to make copies of all such plans, studies, sketches, drawings, computer printouts and disk files, and specifications. OC SAN acknowledges that documents prepared through Professional Services must be revised and sealed by a professional engineer prior to their reuse on another project. OC SAN acknowledges that it assumes all risk associated with reuse of such documents, which are not undertaken by CONSULTANT.
B. CONSULTANT shall not be responsible for damage caused by subsequent changes to or uses of the study or deliverable where the subsequent changes or uses are not authorized or approved by CONSULTANT, provided that the service
rendered by CONSULTANT was not a proximate cause of the damage.
11. INSURANCE
A. General i. Insurance shall be issued and underwritten by insurance companies acceptable to OC SAN. ii. Insurers must have an “A-” Policyholder’s Rating, or better, and Financial Rating of at least Class VIII, or better, in accordance with the most current A.M. Best’s Guide Rating. However, OC SAN will accept State Compensation Insurance Fund, for the required policy of Worker’s Compensation Insurance subject to OC SAN’s option to require a change in insurer in the event the State Fund financial rating is decreased below “B”. Further, OC SAN will require CONSULTANT to substitute any insurer whose rating drops below the levels herein specified. Said substitution shall occur within twenty (20) days of written notice to
CONSULTANT, by OC SAN or its agent. iii. Coverage shall be in effect prior to the commencement of any work under
this AGREEMENT. B. General Liability The CONSULTANT shall maintain during the life of this AGREEMENT, including the period of warranty, Commercial General Liability Insurance written on an occurrence basis providing the following minimum limits of liability coverage: Two Million Dollars ($2,000,000) per occurrence with Four Million Dollars ($4,000,000)
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 8 of 17
aggregate. If aggregate limits apply separately to this contract (as evidenced by submission of ISO form CG 25 03 or 25 04), then the aggregate limit may be
equivalent to the per occurrence limit. Said insurance shall include coverage for the following hazards: Premises-Operations, blanket contractual liability (for this AGREEMENT), products liability/completed operations (including any product
manufactured or assembled), broad form property damage, blanket contractual liability, independent contractors liability, personal and advertising injury, mobile equipment, owners and contractors protective liability, and cross liability and severability of interest clauses. A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement(s). If requested by OC SAN and applicable, XCU coverage (Explosion, Collapse and Underground) and Riggers/On Hook Liability must be included in the General Liability policy and coverage must be reflected on the submitted Certificate of Insurance. Where permitted by law, CONSULTANT hereby waives all rights of recovery by subrogation because of deductible clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, or any other reason against OC
SAN, its or their officers, agents, or employees, and any other consultant, contractor or subcontractor performing work or rendering services on behalf of OC SAN in connection with the planning, development and construction of the
project. In all its insurance coverages related to the work, CONSULTANT shall include clauses providing that each insurer shall waive all of its rights of recovery by subrogation against OC SAN, its or their officers, agents, or employees, or
any other consultant, contractor or subcontractor performing work or rendering services at the project. Where permitted by law, CONSULTANT shall require similar written express waivers and insurance clauses from each of its Subconsultants of every tier. A waiver of subrogation shall be effective as to any individual or entity, even if such individual or entity (a) would otherwise have a duty of indemnification, contractual or otherwise, (b) did not pay the insurance premium, directly or indirectly, and (c) whether or not such individual or entity has an insurable interest in the property damaged. C. Umbrella Excess Liability
The minimum limits of general liability and Automotive Liability Insurance required, as set forth herein, shall be provided for through either a single policy of primary insurance or a combination of policies of primary and umbrella excess
coverage. Umbrella excess liability coverage shall be issued with limits of liability which, when combined with the primary insurance, will equal the minimum limits for general liability and automotive liability.
D. Automotive/Vehicle liability Insurance The CONSULTANT shall maintain a policy of Automotive Liability Insurance on a comprehensive form covering all owned, non-owned, and hired automobiles, trucks, and other vehicles providing the following minimum limit of liability coverage: Combined single limit of Five Hundred Thousand Dollars ($500,000). A statement on an insurance certificate will not be accepted in lieu of the actual additional insured endorsement.
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 9 of 17
E. Drone Liability Insurance
If a drone will be used, drone liability insurance must be maintained by CONSULTANT in the amount of One Million Dollars ($1,000,000) in a form acceptable by OC SAN.
F. Worker’s Compensation Insurance The CONSULTANT shall provide such Workers’ Compensation Insurance as required by the Labor Code of the State of California in the amount of the statutory limit, including Employer’s Liability Insurance with a minimum limit of One Million Dollars ($1,000,000) per occurrence. Such Worker’s Compensation Insurance shall be endorsed to provide for a waiver of subrogation in favor of OC SAN. A statement on an insurance certificate will not be accepted in lieu of the actual endorsements unless the insurance carrier is State of California Insurance Fund and the identifier “SCIF” and endorsement numbers 2570 and 2065 are
referenced on the certificate of insurance. If an exposure to Jones Act liability may exist, the insurance required herein shall include coverage for Jones Act claims.
G. Errors and Omissions/Professional Liability
CONSULTANT shall maintain in full force and effect, throughout the term of this AGREEMENT, standard industry form professional negligence errors and omissions insurance coverage in an amount of not less than Two Million Dollars ($2,000,000) with limits in accordance with the provisions of this Paragraph. If the policy of insurance is written on a “claims made” basis, said policy shall be continued in full force and effect at all times during the term of this AGREEMENT, and for a period of five (5) years from the date of the completion of the services hereunder. In the event of termination of said policy during this period, CONSULTANT shall obtain continuing insurance coverage for the prior acts or omissions of
CONSULTANT during the course of performing services under the term of this AGREEMENT. Said coverage shall be evidenced by either a new policy evidencing no gap in coverage or by separate extended “tail” coverage with the
present or new carrier. In the event the present policy of insurance is written on an “occurrence” basis,
said policy shall be continued in full force and effect during the term of this AGREEMENT or until completion of the services provided for in this AGREEMENT, whichever is later. In the event of termination of said policy during this period, new coverage shall be obtained for the required period to insure for the prior acts of CONSULTANT during the course of performing services under the term of this AGREEMENT. CONSULTANT shall provide to OC SAN a certificate of insurance in a form acceptable to OC SAN indicating the deductible or self-retention amounts and the expiration date of said policy, and shall provide renewal certificates not less than ten (10) days prior to the expiration of each policy term.
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 10 of 17
H. Proof of Coverage The CONSULTANT shall furnish OC SAN with original certificates and amendatory endorsements effecting coverage. Said policies and endorsements shall conform to the requirements herein stated. All certificates and endorsements are to be received and approved by OC SAN before work commences. OC SAN reserves the right to require complete, certified copies of all required insurance policies, including endorsements, effecting the coverage required, at any time. The following are approved forms that must be submitted as proof of coverage:
• Certificate of Insurance ACORD Form 25 or other equivalent Certificate of Insurance form.
• Additional Insurance (General Liability) The combination of (ISO Forms) CG 2010 and CG 2037 All other Additional Insured endorsements must be submitted for approval by OC SAN, and OC SAN may reject alternatives that provide different or less coverage to OC SAN.
• Additional Insured (Auto Liability)
Submit endorsement provided by carrier for OC SAN approval.
• Waiver of Subrogation Submit workers’ compensation waiver of subrogation endorsement provided by carrier for OC SAN approval.
• Cancellation Notice No endorsement is required. However, CONSULTANT is responsible for notifying OC
SAN of any pending or actual insurance policy cancellation, as described in Article I. Cancellation and Policy Change Notice, below. I. Cancellation and Policy Change Notice The CONSULTANT is required to notify OC SAN in writing of any insurance
cancellation notice it receives or other knowledge of pending or actual insurance
policy cancellation, within two (2) working days of receipt of such notice or
acquisition of such knowledge. Additionally, the CONSULTANT is required to
notify OC SAN in writing of any change in the terms of insurance, including
reduction in coverage or increase in deductible/SIR, within two (2) working days of receipt of such notice or knowledge of same.
Said notices shall be mailed to OC SAN at: ORANGE COUNTY SANITATION DISTRICT
10844 Ellis Avenue
Fountain Valley, CA 92708
Attention: Contracts, Purchasing & Materials Management Division
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 11 of 17
J. Primary Insurance
The General and Automobile Liability policies shall contain a Primary and Non Contributory Clause. Any other insurance maintained by OC SAN shall be excess and not contributing with the insurance provided by CONSULTANT. K. Separation of Insured The General and Automobile Liability policies shall contain a “Separation of Insureds” clause. L. Non-Limiting (if applicable) Nothing in this document shall be construed as limiting in any way, nor shall it limit the indemnification provision contained in this AGREEMENT, or the extent to which CONSULTANT may be held responsible for payment of damages to
persons or property. M. Deductibles and Self-Insured Retentions
Any deductible and/or self-insured retention must be declared to OC SAN on the Certificate of Insurance. All deductibles and/or self-insured retentions require
approval by OC SAN. At the option of OC SAN, either: the insurer shall reduce or eliminate such deductible or self-insured retention as respects OC SAN; or the CONSULTANT shall provide a financial guarantee satisfactory to OC SAN guaranteeing payment of losses and related investigations, claim administration and defense expenses. N. Defense Costs The General and Automobile Liability policies shall have a provision that defense costs for all insureds and additional insureds are paid in addition to and do not deplete any policy limits.
O. Subconsultants
The CONSULTANT shall be responsible to establish insurance requirements for any Subconsultant hired by the CONSULTANT. The insurance shall be in amounts and types reasonably sufficient to deal with the risk of loss involving the
Subconsultant’s operations and work. P. Limits Are Minimums If the CONSULTANT maintains higher limits than any minimums shown above, then OC SAN requires and shall be entitled to coverage for the higher limits maintained by CONSULTANT.
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 12 of 17
12. CHANGES
In the event of a change in the Scope of Work or a change in Key Personnel, or change
in hourly rates, as requested by OC SAN, the Parties hereto shall execute an Amendment to this AGREEMENT setting forth with particularity all terms of the new AGREEMENT. CONSULTANT’s compensation for additional services authorized and
performed in accordance with this AGREEMENT shall be agreed to OC SAN and CONSULTANT in writing prior to the time that the additional services are authorized. An Amendment shall be executed to document the change.
13. PROJECT TEAM AND SUBCONSULTANTS
Neither this AGREEMENT nor any interest herein nor claim hereunder may be assigned
by CONSULTANT either voluntarily or by operation of law, nor may all or any part of the AGREEMENT be subcontracted by CONSULTANT, without the prior written consent of OC SAN. Consent by OC SAN shall not be deemed to relieve CONSULTANT of its obligation to comply fully with all terms and conditions of this AGREEMENT.
CONSULTANT shall provide to OC SAN, prior to execution of this AGREEMENT, the names and full description of all Subconsultants and CONSULTANT’s project team
members anticipated to be used on this Project under this AGREEMENT by CONSULTANT. CONSULTANT shall include a description of the work and services to be done by each Subconsultant and each of CONSULTANT’s team member. CONSULTANT shall include the respective compensation amounts for CONSULTANT and each Subconsultant, broken down as indicated in Section 2- COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT’s team
members without prior written approval by OC SAN.
14. AUDIT PROVISIONS
A. OC SAN retains the reasonable right to access, review, examine, and audit, any and all books, records, documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify that the
CONSULTANT is in compliance with all requirements under this AGREEMENT. The CONSULTANT shall include OC SAN’s right as described above, in any and all of their subcontracts, and shall ensure that these rights are binding upon all
Subconsultants. B. OC SAN retains the right to examine CONSULTANT’s books, records,
documents and any other evidence of procedures and practices that OC SAN determines are necessary to discover and verify all direct and indirect costs, of whatever nature, which are claimed to have been incurred, or anticipated to be incurred or to ensure CONSULTANT’s compliance with all requirements under this AGREEMENT during the term of this AGREEMENT and for a period of three (3) years after its termination. C. CONSULTANT shall maintain complete and accurate records in accordance with generally accepted industry standard practices and OC SAN’s policy. The CONSULTANT shall make available to OC SAN for review and audit, all project
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 13 of 17
related accounting records and documents, and any other financial data within 15 days after receipt of notice from OC SAN. Upon OC SAN’s request, the
CONSULTANT shall submit exact duplicates of originals of all requested records to OC SAN. If an audit is performed, CONSULTANT shall ensure that a qualified employee of the CONSULTANT will be available to assist OC SAN’s auditor in
obtaining all Project related accounting records and documents, and any other financial data.
15. LEGAL RELATIONSHIP BETWEEN PARTIES
The legal relationship between the parties hereto is that of an independent contractor and nothing herein shall be deemed to transform CONSULTANT, its staff, independent contractors, or Subconsultants into employees of OC SAN. CONSULTANT’S staff performing services under the AGREEMENT shall at all times be employees and/or independent contractors of CONSULTANT. CONSULTANT shall monitor and control its staff and pay wages, salaries, and other amounts due directly to its staff in connection with the AGREEMENT. CONSULTANT shall be responsible for hiring, review, and termination of its staff and shall be accountable for all reports and obligations respecting
them, such as social security, income tax withholding, unemployment compensation, workers’ compensation and similar matters.
16. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of this AGREEMENT, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, return
receipt requested, postage prepaid and addressed as follows:
ORANGE COUNTY SANITATION DISTRICT 10844 Ellis Avenue Fountain Valley, CA 92708-7018 Attention: Diane Marzano, Senior Contracts Administrator Copy: Michael Dorman, Engineering Manager CONSULTANT:
«Company»
«ConsultantsName» «Address» «CityStateZip» All communication regarding the Scope of Work, will be addressed to the Engineering Manager. Direction from other OC SAN staff must be approved in writing by OC SAN’s Project Manager prior to action from the CONSULTANT.
17. TERMINATION
OC SAN may terminate this AGREEMENT at any time, without cause, upon giving thirty (30) days written notice to CONSULTANT. In the event of such termination, CONSULTANT shall be entitled to compensation for work performed on a prorated basis
through and including the effective date of termination.
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 14 of 17
CONSULTANT shall be permitted to terminate this AGREEMENT upon thirty (30) days written notice only if CONSULTANT is not compensated for billed amounts in
accordance with the provisions of this AGREEMENT, when the same are due.
Notice of termination shall be mailed to OC SAN at the address listed in Section 16 - NOTICES.
18. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this Project shall become the property of OC SAN upon the termination or completion of the work. CONSULTANT agrees to furnish to OC SAN copies of all memoranda, correspondence, electronic materials, computation and study materials in its files pertaining to the work described in this AGREEMENT, which is requested in writing by OC SAN.
19. COMPLIANCE
A. Labor CONSULTANT certifies by the execution of this AGREEMENT that it pays
employees not less than the minimum wage as defined by law, and that it does not discriminate in its employment with regard to race, color, religion, sex or national origin; that it is in compliance with all federal, state and local directives
and executive orders regarding non-discrimination in employment; and that it agrees to demonstrate positively and aggressively the principle of equal opportunity in employment.
B. Air Pollution CONSULTANT and its subconsultants and subcontractors shall comply with all applicable federal, state and local air pollution control laws and regulations.
20. AGREEMENT EXECUTION AUTHORIZATION
Both OC SAN and CONSULTANT do covenant that each individual executing this document by and on behalf of each Party is a person duly authorized to execute this AGREEMENT for that Party.
21. DISPUTE RESOLUTION
In the event of a dispute arising between the parties regarding performance or interpretation of this AGREEMENT, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service (“JAMS”), or similar
organization or entity conducting alternate dispute resolution services.
22. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS
If any action at law or in equity or if any proceeding in the form of an Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this AGREEMENT, the prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which he may be entitled.
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 15 of 17
23. INDEMNIFICATION AND HOLD HARMLESS PROVISION
CONSULTANT shall assume all responsibility for damages to property and/or injuries to
persons, including accidental death, which may arise out of or be caused by CONSULTANT's services under this Agreement, or by its subconsultant(s) or by anyone directly or indirectly employed by CONSULTANT, and whether such damage or injury
shall accrue or be discovered before or after the termination of the AGREEMENT. Except as to the sole active negligence of or willful misconduct of OC SAN, CONSULTANT shall indemnify, protect, defend and hold harmless OC SAN, its elected and appointed officials, officers, agents and employees, from and against any and all claims, liabilities, damages or expenses of any nature, including attorneys' fees: (a) for injury to or death of any person or damage to property or interference with the use of property, arising out of or in connection with CONSULTANT's performance under the AGREEMENT, and/or (b) on account of use of any copyrighted or uncopyrighted material, composition, or process, or any patented or unpatented invention, article or appliance, furnished or used under the AGREEMENT, and/or (c) on account of any goods and services provided under this AGREEMENT. This indemnification provision
shall apply to any acts or omissions, willful misconduct, or negligent misconduct, whether active or passive, on the part of CONSULTANT or anyone employed by or working under CONSULTANT. To the maximum extent permitted by law,
CONSULTANT's duty to defend shall apply whether or not such claims, allegations, lawsuits, or proceedings have merit or are meritless, or which involve claims or allegations that any of the parties to be defended were actively, passively, or
concurrently negligent, or which otherwise assert that the parties to be defended are responsible, in whole or in part, for any loss, damage, or injury. CONSULTANT agrees to provide this defense immediately upon written notice from OC SAN, and with well qualified, adequately insured, and experienced legal counsel acceptable to OC SAN. This section shall survive the expiration or early termination of the AGREEMENT.
24. COMPLIANCE WITH OC SAN POLICIES AND PROCEDURES CONSULTANT shall comply with all OC SAN policies and procedures including the
Contractor Safety Standards, as applicable, all of which may be amended from time to time.
25. CLOSEOUT
When OC SAN determines that all Work authorized under the AGREEMENT is fully complete and that OC SAN requires no further work from CONSULTANT, or the AGREEMENT is otherwise terminated or expires in accordance with the terms of the AGREEMENT, OC SAN shall give the Consultant written notice that the AGREEMENT will be closed out. CONSULTANT shall submit all outstanding billings, work submittals, deliverables, reports or similarly related documents as required under the AGREEMENT within thirty (30) days of receipt of notice of AGREEMENT closeout. Upon receipt of CONSULTANT’s submittals, OC SAN shall commence a closeout audit of the AGREEMENT and will either: i. Give the CONSULTANT a final AGREEMENT Acceptance: or
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 16 of 17
ii. Advise the CONSULTANT in writing of any outstanding item or items which must be furnished, completed, or corrected at the CONSULTANT’s cost.
CONSULTANT shall be required to provide adequate resources to fully support any administrative closeout efforts identified in the AGREEMENT Such support must be
provided within the timeframe requested by OC SAN. Notwithstanding the final AGREEMENT acceptance, the CONSULTANT will not be relieved of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to complete any portions of the work, the non-completion of which were not disclosed to OC SAN (regardless of whether such nondisclosures were fraudulent, negligent, or otherwise), and the CONSULTANT shall remain obligated under all those provisions of the AGREEMENT which expressly or by their nature extend beyond and survive final AGREEMENT Acceptance. Any failure by OC SAN to reject the work or to reject the CONSULTANT’s request for
final AGREEMENT Acceptance as set forth above shall not be deemed to be acceptance of the work by OC SAN for any purpose nor imply acceptance of, or AGREEMENT with, the CONSULTANT’s request for final AGREEMENT Acceptance.
26. PROHIBITION
During the term of this AGREEMENT, CONSULTANT and its Subconsultants may not propose on any construction work advertised by or on behalf of OC SAN, if such work
presents actual or perceived conflict of interest with CONSULTANT’s assignments with OC SAN.
CONSULTANT and its Subconsultants shall promptly disclose to OC SAN when such conflict exists prior to participating in any work as advertised by OC SAN or on its behalf.
CONSULTANT and its Subconsultants acknowledge and agree that OC SAN’s determination regarding such conflicts, that may impact CONSULTANT’s and its Subconsultants’ ability to propose on the work as described herein, shall be final and cannot be appealed.
27. ENTIRE AGREEMENT
This AGREEMENT constitutes the entire understanding and AGREEMENT between the Parties and supersedes all previous negotiations between them pertaining to the subject
matter thereof.
PSA PSA2021-001
Revised 062821 PROGRAMMING PROFESSIONAL SERVICES
Page 17 of 17
IN WITNESS WHEREOF, this AGREEMENT has been executed in the name of OC SAN, by its officers thereunto duly authorized, and CONSULTANT as of the day and year first above
written. CONSULTANT: COMPANY NAME
By __________________________________________________ Date __________________________________________________ Printed Name & Title
ORANGE COUNTY SANITATION DISTRICT
By __________________________________________________ John B. Withers Date
Board Chairman
By __________________________________________________ Kelly A. Lore Date Clerk of the Board
By __________________________________________________ Ruth Zintzun Date Purchasing & Contracts Manager
Attachments: Attachment “A” – Scope of Work Attachment “A1” – Rules of Engagement Attachment “B” – Not Used
Attachment “C” – Conflict of Interest Disclaimer Attachment “D” – Allowable Direct Costs Attachment “E” – Fee Proposal Attachment “F” – Not Used Attachment “G” – Not Used Attachment “H” – Acknowledgement of Addenda Receipt Attachment “I” – Acknowledgement of Contract Agreement Attachment “J” – Not Used Attachment “K” – Contractor Safety Standards
ATTACHMENT “A”
SCOPE OF WORK
DR
A
F
T
SCOPE OF WORK PSA2021-001
1
ATTACHMENT A
SCOPE OF WORK
I. SUMMARY
The Orange County Sanitation District (OC SAN) is a special district responsible for wastewater
conveyance and treatment for metropolitan Orange County, California. It has been in existence
since 1954 and is the third largest wastewater treatment agency west of the Mississippi River.
OC SAN is soliciting Proposals to provide Programming Professional Services (PPS) to support
its engineering projects, which includes large and small capital projects and operationally
funded repair projects. OC SAN’s facilities consists of Water Reclamation Plant No. 1,
Treatment Plant No. 2 and 15 pump stations.
II. BACKGROUND
OC SAN has budgeted for a 10-year $3.0 billion capital improvement program, the vast majority
of which is managed by the Engineering Department. OC SAN also has an active asset
management program which includes many repair projects that, due to their complexity, are
managed by its Engineering Department.
OC SAN’s Process Control Integration Group (PCI) performs all programming of programmable
logic controllers (PLCs) and human machine interface (HMI) for all plant and pump station
projects along with the associated commissioning. OC SAN utilizes Modicon Quantum PLC
hardware and has recently migrated to Modicon M580 due to obsolescence. The HMI utilizes
Copland Roland Interpreted Sequential Processor (CRISP), which is a VAX based system. OC
SAN is in the process of finalizing the procurement of a new control system that will standardize
on a new control and HMI system for the plants and pump stations. Starting in late 2021, Project
No. J-120 Process Control Systems Upgrades will replace the existing HMI for the plants and
pump stations. The existing PLCs will be replaced under future Capital Improvement Program
(CIP) projects as part of a replacement or rehabilitation project. Over the next 5 years, there is a
significant increase in the PCI workload due to construction projects and J-120, requiring the
need for programming professional services.
III. PROFESSIONAL SERVICES REQUIRED
Following award of an agreement, OC SAN will determine when specific services are required.
The mechanisms for requesting, reviewing, authorizing, and terminating services under this
agreement are documented in Attachment “A1” – Rules of Engagement. As described in that
attachment, work assignments will fall into one of the following types:
Task Authorizations. Task Authorizations have formal scopes of work and firm upper
limits.
Task Directives. Task Directives are typically smaller than Task Authorizations, but do
not have a firm upper limit.
DR
A
F
T
SCOPE OF WORK PSA2021-001
2
The selected firm will assist PCI by providing highly skilled and experienced resources to
program and commission PLCs and HMI graphics and shall provide qualified programming
resources to execute work through Task Authorizations and Task Directives. The provided
resources shall include the appropriate experience balance that provides a high-quality,
cost-effective project execution. Task Authorizations will be developed for a specific scope
of work such as the programming of a PLC or the development of HMI screens for a specific
process area. Task Authorization duties include but are not limited to: Programming and
documenting Modicon Quantum and M580 PLCs and CRISP or new HMI system screens
using OC SAN programming standards, reviewing PLC and remote input/output (I/O) panel
shop drawings, reviewing and updating I/O lists (also known as SCADA Administrative Tool
(SAT)), coordinating the programming with PCI staff, coordinating with OC SAN
commissioning coordinator, bench testing programs, and commissioning programs during
Operational Readiness Test (ORT), Functional Acceptance Testing (FAT), and Reliability
Acceptance Testing (RAT). See Section 17410 Programming Using OC SAN Standards and
associated attachments for OC SAN’s programming requirements.
The selected firm’s staff shall have a thorough working knowledge and understanding of
programmable logic controllers (using ladder logic and function block) and configuration of
HMI systems and graphics. Staff shall be able to interpret engineering drawings and
documents such as process and instrument diagrams (P&IDs), control strategies, motor
control schematics, panel drawings, and PLC communication networks.
Estimated Full-Time Staff Required
The following staff levels are estimated based on projected programming and
commissioning workloads. The actual number of staff will be based on the required hours for
the selected firm to complete the assigned programming and commissioning scope of work.
Staff Needed by Contract Year
Function Year 1 Year 2 Year 3 Year 4 Year 5
Fiscal Year FY21-22 FY22-23 FY23-24 FY24-25 FY25-26
PLC/SCADA Programmer 6.0 6.0 6.0 6.0 5.0
IV. TASK ASSIGNMENTS
OC SAN will authorize specific tasks to be completed by CONSULTANT. These tasks will vary
widely in size, cost, and complexity. Tasks will be authorized as either a Task Authorization or a
Task Directive, as described in Attachment “A1” – Rules of Engagement.
Task Authorizations have a formal scope of work and a fixed upper limit. Task Directives also
have an explicit scope of work, but the level of detail may be lower. Task Directives need a
budgetary estimate, but not a firm upper limit.
DR
A
F
T
SCOPE OF WORK PSA2021-001
3
V. PERSONNEL ASSIGNMENTS
OC SAN will require CONSULTANT to provide staff to fill specific roles on specific projects, and,
in some cases, for its Engineering Program, as described in Attachment “A1” – Rules of
Engagement.
Personnel Authorizations
Personnel Authorizations authorize a particular individual to work on Task Directives
VI. LOGISTICS AND CONTRACT MANAGEMENT
Work Location
CONSULTANT’s on-site staff shall be located at OC SAN’s facilities in Fountain Valley or
Huntington Beach, California. At times, work may be required at other OC SAN facilities or at
job site locations away from OC SAN facilities. At the CONSULTANT’s discretion and
concurrence with the OC SAN representative, the assigned CONSULTANT staff may be located
at CONSULTANT’s home office when performing programming. All bench testing and
commissioning shall be performed at OC SAN’s facilities. Advanced coordination with OC SAN
may be required for CONSULTANT staff working at OC SAN facilities on OC SAN holidays.
Point of Contact/Supervision
CONSULTANT shall designate an individual as the single point of contact to direct efforts in
fulfilling contracted obligations under this Agreement. The selected designee shall be
responsible for the direct supervision of assigned staff, including such activities as work
schedules, quality of work performed, technical oversight, vacation requests, discipline, etc. The
selected designee shall not be changed without prior written notification to the OC SAN
representative.
CONSULTANT is responsible for supervision of its entire staff, including the requirements
defined in Attachment “A1” – Rules of Engagement:
OC SAN Project Procedures
CONSULTANT’s staff assigned to work on OC San projects shall save project related
deliverables, documents and/or records in OC San accessible locations i.e., OC San SharePoint
servers and/or OC San licensed cloud-based applications such as Bluebeam, PMWeb or One
Drive, as applicable to the project assignment, to comply with Public Records Act
requirements. Accessibility to these locations shall be provided by OC San.
Provided Facilities & Equipment
OC SAN will provide the following for CONSULTANT’s on-site staff:
Furnished office space at OC SAN
Computers, software, network, and printing capabilities
DR
A
F
T
SCOPE OF WORK PSA2021-001
4
Office telephone
Personal Protective Equipment
CONSULTANT staff assigned to OC SAN facilities may be exposed to known plant process and
work hazards and therefore will be required to have appropriate Personal Protective Equipment
(PPE) such as: eye and face protection (safety glasses), head protection (hard hat), hand
protection (gloves), foot protection (safety toed shoes), high visibility clothing (Class 3 vests),
hearing protection, personal gas monitor (4 gas), and other forms of PPE. CONSULTANT shall
provide all equipment and training necessary to comply with OC SAN safety polices. Refer to
Contractor Safety Standards – Attachment “K”.
Time Tracking & Invoicing
CONSULTANT shall submit invoices, including cost and hours, monthly. Invoice shall be
submitted no later than the 15th of each month. OC SAN maintains a project controls system
containing detailed cost and hours information for all Engineering Projects. The format for
reporting hours shall be in an importable format, such as Microsoft Excel, and contain, at a
minimum, the following items:
Column Description
Project Number OC SAN will provide a list of project numbers. These numbers are
subject to change as new projects are added and existing projects are
completed.
Work Package
Number
OC SAN will provide a list of work package numbers. The work
package numbers are subject to change as a project transitions from
one phase to the next.
Employee ID Each employee included in the hours report must contain a unique
identification number.
Employee Name Employee name.
Work Date The week ending date when work was performed.
Hours by Week The total number of hours worked for the week. In addition, it may be
necessary to report overtime hours which will require a separate
report.
Total Burdened Cost The total burdened cost shall include actual salary, fringe costs,
overhead, and profit by person.
Performance Requirements
Assigned staff must perform their duties to OC SAN’s satisfaction. OC SAN reserves the right to
reject any proposed staff or replace any assigned staff at any time. The Point of Contact shall
replace staff upon OC SAN’s request.
DR
A
F
T
SCOPE OF WORK PSA2021-001
5
Work Quality
CONSULTANT shall be responsible for the professional quality and technical competence of
assigned staff supplied to OC SAN. Additionally, the firm shall be responsible for the
coordination of all efforts and other services furnished under the agreement.
Management of Resource Assignments
OC SAN will maintain a cloud-based workflow tool to request, review, authorize, and close
resource assignments. That workflow tool is currently PMWeb. CONSULTANT’s Point of
Contact will be required to utilize this tool to track all requests through their life cycles. OC SAN
will use this workflow tool to verify that any invoiced costs have been duly approved through the
workflow tool. Section 01701 Resource Assignment Management System for requirements.
Attachments
Section 01701 Resource Assignment Management System
Section 17410 Programming Using OC SAN Standards
Section 17410 Attachment A – SAT Data Dictionary
Section 17410 Attachment B – Sample Technical Memorandum
Section 17410 Attachment C – Sample Test Sheet
Section 17410 Attachment D – Sample Program Flowchart
DR
A
F
T
PSA2021-001 RESOURCE ASSIGNMENT
PROGRAMMING PROFESSIONAL SERVICES MANAGEMENT SYSTEM
01701-1
Section 01701
RESOURCE ASSIGNMENT MANAGEMENT SYSTEM
PART 1 - GENERAL
1.1 SUMMARY
A. OC SAN will request, review, authorize, and closeout Resource Assignments under the
Programming Professional Services (PPS) Agreement utilizing a Resource Assignment
Management System (RAMS) using PMWeb. Resource Assignments include Task Authorizations
and Task Directives.
B. The RAMS uses the same workflow engine as OC SAN uses to manage its construction
contracts. The PMWeb application is a cloud-based solution used to facilitate the electronic
exchange of information. PMWeb runs inside most internet browsers - see “PMWeb Operating
Requirements” described herein. OC SAN will provide CONSULTANT with user account and web
address. Internet access is required to use PMWeb.
C. Use the PMWeb for all required documentation and correspondence related to Resource
Assignments as described in article “System Use.”
1.2 SYSTEM USE
A. Utilize PMWeb for the following:
1. Proposing staff for Resource Assignments on Task Directives
2. Submitting Task Authorization Proposals
3. Receiving and tracking OC SAN approvals of Resource Assignments
4. Revising authorized Resource Assignments
5. Closing out completed or terminated Resource Assignments.
1.3 PMWEB OPERATING REQUIREMENTS
A. In order to process correspondence via PMWeb as detailed herein, maintain the minimum
requirements outlined in this article.
1. Internet service requirements are as follows:
a. Provide broadband internet access to Project staff utilizing PMWeb.
b. Document upload and download speeds depend on internet speed. A fast internet
service is highly recommended.
2. Provide the computer and networking hardware to access PMWeb.
B. Software requirements are as follows:
1. Modern internet browser maintained with current versions/security patches such as:
a. Internet Explorer (latest released version)
b. Mozilla Firefox (latest released version)
c. Google Chrome (latest released version)
d. iOS Safari (latest released version)
2. Microsoft Office 2019 or newer
3. Adobe Acrobat or BlueBeam Vu/Revu (latest version)
1.4 RAMS ACCESS AND LIMITATIONS
A. OC SAN will maintain the RAMS and serve as the administrator for the duration of this Project.
DR
A
F
T
RESOURCE ASSIGNMENT PSA2021-001
MANAGEMENT SYSTEM PROFESSIONAL PROGRAMMING SERVICES
01701-2
B. OC SAN will provide up to two PMWeb license(s) for use on this agreement only.
C. OC SAN will provide CONSULTANT with user access for approved personnel as needed for
the duration of the Project. OC SAN shall control access to PMWeb by assigning user profiles and
login credentials.
1. OC SAN will create user accounts for CONSULTANT provided list of personnel that will be
utilizing PMWeb.
2. Notify OC SAN of any changes to personnel. Access modifications shall be coordinated as
needed throughout the Project.
3. Subconsultants shall not be provided access to PMWeb. Transmittal of information
between CONSULTANT and its Subconsultants is not within the scope of PMWeb and shall
be the responsibility of the CONSULTANT.
D. Routine maintenance of PMWeb may be required during the Project. Access to PMWeb may
be restricted or unavailable at these times and will be scheduled outside of typical working hours
whenever possible.
E. Should PMWeb become unavailable for an unanticipated period of time, the CONSULTANT
shall notify OC SAN accordingly. Upon OC SAN’s direction, correspondence shall proceed via
email or other electronic means in accordance with the General Requirements until PMWeb access
is restored.
1.5 CONNECTIVITY PROBLEMS
A. PMWeb is a web-based environment and is therefore subject to the inherent speed and
connectivity problems of the Internet. CONSULTANT is responsible for its own connectivity to the
Internet. PMWeb response time is dependent on the CONSULTANT’s equipment, including
processor speed, Internet access speed, Internet traffic, etc.
B. OC SAN will not be liable for any delays associated with the utilization of PMWeb including,
but not limited to: slow response time, down time periods, connectivity problems, or loss of
information.
1.6 CONSULTANT’S RESPONSIBILITY
A. Provide personnel to support RAMS activities.
B. Responsible for the validity and accuracy of information placed within RAMS by CONSULTANT
personnel.
1. Users shall be proficient in the use of computers, including internet browsers, email
programs, Microsoft Word, Microsoft Excel, and Adobe or Bluebeam Portable Document
Format (PDF) document distribution program.
2. PDF documents shall be created through electronic conversion rather than being optically
scanned whenever possible.
3. PDF documents shall be searchable. Should electronic conversion not be possible,
optically scan at a resolution of 200 dots per inch and convert the scanned text using optical
character recognition (OCR) capable software prior to uploading.
4. PDF document security restrictions shall be set to enable commenting so that
ENGINEER’s comments can be added to the document using Adobe Reader or BlueBeam
Vu/Revu.
C. Responsible for the training of its personnel in the use of the RAMS (outside what is provided
by the ENGINEER) and the other programs indicated above as needed.
1.7 TRAINING
A. The ENGINEER will provide a one-time training session of up to 2 hours to train up to 4 of the
CONSULTANT’s designated staff on general system requirements, procedures, and methods.
DR
A
F
T
PSA2021-001 RESOURCE ASSIGNMENT
PROGRAMMING PROFESSIONAL SERVICES MANAGEMENT SYSTEM
01701-3
1. CONSULTANT is responsible for training all other staff not included in ENGINEER’s
session including any replacement personnel.
2. The ENGINEER will communicate the locations, date and time of training session. Training
will occur within 14 days after the effective date of the Notice to Proceed (NTP).
B. CONSULTANT shall be required to train their personnel on the principles and operation of all
other software utilized for this Contract.
1.8 COMMUNICATION PROCESS
A. All RAMS related documents requiring formal signatures shall be digital, and all copies digitally
distributed.
1. PMWeb conforms to the requirements set forth in California Government Code section
16.5 regarding digital signatures; therefore, digital signatures are in full force and effect and
are legally the same as a hand-written signature.
2. At least one RAMS account shall have the authority to approve Resource Assignments.
3. Take care not to share PMWeb account passwords.
B. Official logs of assignments shall be maintained within RAMS.
1.9 AUTOMATED SYSTEM NOTIFICATION
A. Automated system notifications generated via PMWeb (e.g. in-system notices, system
generated email, or email with attachment) shall constitute a formal written notification in
compliance with the Contract Documents.
DR
A
F
T
PSA2021-001 PROGRAMMING USING
PROGRAMMING PROFESSIONAL SERVICES OC SAN STANDARDS
17410-1
Section 17410
PROGRAMMING USING OC SAN STANDARDS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1. Programming of PLC’s using OC SAN’s programming standards.
2. Programming of HMI’s screens using OC SAN’s programming standards.
3. I/O to be programmed will be defined by the following project Contract Documents
associated with a construction project:
a. SAT database
b. P&IDs
c. Elementary/control schematic
d. Control Strategies
e. Programming flowchart.
1.2 DEFINITIONS
A. Bench Test: A critical evaluation of the PLC and HMI and OIT interaction prior to
installation in the field to ensure that all functions perform as intended.
B. Functional Acceptance Test (FAT): Tests equipment and instrument operation and
shutdowns under load (in REMOTE MANUAL mode of operation) using process fluid
(water, air, etc.) to verify proper functionality. Tests equipment and systems in REMOTE
AUTOMATIC and AUTOMATIC modes of operation with software and water (as defined in
the procedure or Part 3) or other process fluid to simulate normal operating conditions.
Test automatic transfer switches with normal and standby power sources. Test medium-
voltage and low-voltage switchgear by simulating incoming voltage to the protective
devices. For non-process systems, test the functionality of the system using actual
conditions (i.e. fire alarm system, access control system, HVAC, battery chargers,
automatic transfer switches, uninterruptible power supplies, generators, etc.).
C. Human/Machine Interface (HMI): A graphical user interface linked to PLC registers
allowing the monitoring and control of the process. CRISP is the HMI software used on
servers and workstations in the ICS network to display PLC data using the plant wide
network.
D. Modify: Additions, deletions, rearrangement, change alteration, appendage, or any
other change.
E. Operator Interface Terminal (OIT): A local touch screen Industrial PC panel used to
display and control a process associated with a single PLC or group of PLCs.
F. Operational Readiness Test (ORT): Tests equipment, instrumentation, wiring,
hardware, and software without water or any other process fluid in the LOCAL, HAND and
REMOTE MANUAL modes of operation.
G. OC SAN Process Control Integration (PCI) Group: The group responsible for the
ongoing SCADA system maintenance and enhancements. The group includes
programmers and has access to other support personnel, program documentation, and
other vital documents. PCI is a subunit of the ENGINEER.
H. OC SAN PLC Programming Standards: The OC SAN PLC Programming Standards
are comprised of software templates to accomplish common functions such as variable
DR
A
F
T
PROGRAMMING USING PSA2021-001
OC SAN STANDARDS PROGRAMMING PROFESSIONAL SERVICES
17410-2
speed pump control and a set of rules to guide programmers on how to organize programs,
perform tagging, develop custom programming, etc.
I. OC SAN PLC Software Templates: The OC SAN PLC Software Templates are
provided to the programmer by OC SAN. Software Templates shall be used as provided.
The programmer shall not modify the code contained within a Software Template. Custom
versions of Software Templates shall be requested in writing from ENGINEER.
J. Programming Flowchart (PF): The Programming Flowchart is a tool that is used to
outline all the sections required for a complete PLC program. The flowchart must include
programming for all Real I/O, SCADA I/O, Templates, custom programming, including
descriptions for how each point, Software Template or custom code block behaves.
K. Process Control Software: SCADA, PLC and SAT software packages with any
integrated operator interfaces or monitor/controllers.
L. Programmer: The programmer is the person or team responsible for producing
Process Control Software. The programmer is a subunit of the CONSULTANT.
M. Reliability Acceptance Test (RAT): A test to check that the system can operate
continuously in the intended manner for an extended period without failure. During the
RAT, the system under test shall be operated within design parameters reflecting the day-
to-day operation of the facilities for an uninterrupted period.
N. Real Input/Output (Real I/O): Real I/O refers to the physical (hardwired) input and
output points of the PLC.
O. SCADA Administration Tool (SAT): The term SAT will at times refer to two separate
but related items depending on the context.
1. A database (in MS Access) that is the source for both PLC and HMI descriptions.
This database also contains internal PLC points and is used as a data repository for
other functions.
2. A custom desktop application that helps create and validate the SAT database as
well as produce output files for import into PLC’s and HMI’s.
P. Supervisory Control and Data Acquisition System (SCADA): The SCADA system
includes PLCs connected through process data communications networks to a server that
services HMI workstations used for control.
Q. SCADA Input/Output (SCADA I/O): SCADA I/O refers to virtual input and output to/from
the HMI. Process Control Software. SCADA, PLC, and SAT software packages with any
integrated operator interfaces or monitor/controllers.
1.3 SUBMITTALS
A. Submittals shall be made as specified herein.
B. Submittals are required during the programming process as described in this section.
Further detailed information regarding steps and submittal details can be found in Part 3 –
EXECUTION.
1. Initial Program Development (Step 2)
a. I/O Information Documented in the SAT Database: Submit the real I/O records
portion of the SAT database.
b. Preliminary Program Flowchart: Programmer shall start the preliminary PF
during the onsite orientation session. Submit a preliminary PF.
c. Draft HMI Graphics: Submit draft HMI graphics for review. This shall include
process overviews, process graphics, equipment detail screens, configuration
screens, sequence screens, control stations, diagnostic screens, etc.
DR
A
F
T
PSA2021-001 PROGRAMMING USING
PROGRAMMING PROFESSIONAL SERVICES OC SAN STANDARDS
17410-3
d. P&ID Drawings: Redline PDF P&ID drawings per changes during the initial
program development
2. Final Program Development. (Step 3)
a. Updated PF: Submit the updated PF for review.
b. PLC Program: The final version of the untested, fully documented, PLC
program that is to be bench tested shall be fully documented and complete. All
parameters, routines, subroutines, variables, etc. are complete. The logic of the
process operation is tested in Step 5. Submit a PDF copy of the PLC program as
well as a copy of the PLC program in its native format for review.
c. SAT Database: Submit a copy of the completed SAT database records with
current information for review.
d. HIM Graphics: Include complete set of HMI graphic screens (color printout
PDF screen captures).
e. HMI Program: The final version of the untested, fully documented, HMI
program that is to be bench tested shall be fully documented and complete. The
HMI screens are tested in Step 5. Submit the HMI program in its native format for
review.
e. Test Sheets and Test Procedures: Submit the bench test sheets and bench
test procedures for review.
3. Bench Test:
a. Bench Test Sheet and Procedure Sign Off Sheets: Submit the completed
bench test sheets and procedure sign off sheets for review. Resubmit bench test
sheets and procedure sign off sheets after correcting errors found during the bench
testing for review. Attachment C shows a Sample Test Sheet.
4. Bench Tested Accepted Software Submittal
a. Submit Bench Tested Accepted Software in both native software and printout
in searchable pdf forms.
b. Submitted software shall be loaded into the PLC and HMI workstation to start
the testing and commissioning.
5. As-Built Documentation
a. Submit Final Documentation: Submit all as-built documentation updated to
reflect all deviations from the design and submittal documents that occurred during
installation, startup, and acceptance testing for review.
1.4 QUALITY ASSURANCE
A. Review programming progress with PCI monthly.
PART 2 - PRODUCTS
2.1 PLC PROGRAMMING
A. Perform the PLC programming using the OC SAN-accepted ProWORX NXT or Control
Expert.
B. Develop a programming flowchart using the latest version of Microsoft Excel software.
Microsoft Office Professional software, the latest version, is used for word processing,
spreadsheets and for SAT.
DR
A
F
T
PROGRAMMING USING PSA2021-001
OC SAN STANDARDS PROGRAMMING PROFESSIONAL SERVICES
17410-4
2.2 HMI PROGRAMMING
A. An HMI will be available at OC SAN for the programmer to use during graphics
development and bench testing.
PART 3 - EXECUTION
3.1 GENERAL
A. All PLC’s and HMIs shall be programmed to the latest version of the OC SAN PLC
Programming Standards. The PLC programming standards will be provided upon request.
B. All OC SAN programming tools shall be utilized in accordance with their standards and
requirements.
C. The programming goal is to create an integrated, standardized control program for all
SCADA system devices. The multiple steps and milestones described below are designed
to achieve this goal with a minimum amount of rework, compromise, or wasted effort.
D. If changes, additions or deletions are made to an existing PLC, repeat the bench test
of all process control software and real I/O connected to the PLC. The testing shall be
performed in accordance with this Specification and Section 01810, Commissioning. PCI
will identify all minor program changes not subject to this requirement.
E. Electronic versions of PLC programs are available from PCI in PDF format.
F. The P&ID Drawings used to develop the program do not show all the SCADA I/O
required for a complete and operable program. For example, confirming signals are not
shown.
3.2 PROGRAMMING PROCESS (SCHEDULE)
A. The following is a high-level overview of the programming process. Each of the steps
is described in more detail in this section.
B. A step in the programming process below is considered complete when all the
submittals required for that step have been accepted by the ENGINEER. The selected firm
may not proceed to the next step until the previous step is complete.
1. Step 1: Orientation (Completion of this step constitutes 5 percent of programming
completion).
a. Programmers shall participate in a 2-week OC SAN onsite orientation session
under direction of PCI. During this session, the programmer(s) will be trained on
PLC and HMI standards, SAT, Flowchart, and Technical Memorandum
development. No submittal is required to complete this step.
2. Step 2: Initial Program Development (Completion of this step constitutes 10
percent of programming completion).
a. Real I/O Information Documented in the SAT Database: Update the real input
and output records of the SAT database develop. The real I/O SAT database is
developed by the design engineer. Refer to “SAT Database” paragraphs in this
Specification for more information on the SAT.
b. Preliminary Program Flowchart: Programmer to start the preliminary PF during
the 2-week onsite orientation session. Submit the preliminary PF.
c. Graphics Sketches: Provide a pdf and native version of all unique graphics of
the proposed HMI graphics. This shall include process overviews, process
graphics, configuration screens, sequence screens, control stations, etc.
DR
A
F
T
PSA2021-001 PROGRAMMING USING
PROGRAMMING PROFESSIONAL SERVICES OC SAN STANDARDS
17410-5
3. Step 3: Final Program Development. All submittals to be completed prior to bench
testing. (Completion of this step constitutes 30 percent of programming completion. All
submittals to be completed prior to bench test.)
a. Updated PF: The PF shall be updated to show Work to date.
b. PLC Program: The final version of the untested PLC program shall be
complete. All parameters, routines, subroutines, variables, etc. are complete and
fully documented. NOTE: PLC Logic and SAT database is reviewed for
conformance to standard. The logic of the process operation is tested in Step 5.
c. SAT Database: All appropriate SAT database records shall be completed with
current information.
d. HMI Graphics: The final set of HMI graphic screens shall be complete.
e. Test Sheets and Test Procedures: Develop the proposed testing procedures
with accompanying test sheets for the bench test. The test sheets and test
procedures to be submitted and acceptance obtained prior to bench testing.
Refer to Attachment C to this Specification section for format.
4. Step 4: Bench Test (Completion of this step constitutes 15 percent of programming
completion):
a. Bench Test: Commission and execute a bench test at OC SAN Plant 1. The
bench test consists of loading the SAT database, the HMI graphics and the
PLC program into a standalone workstation networked to a test PLC, then
testing all functions. NOTE: The bench test is to assure coordination between
PLC logic and HMI graphics, not the logical operation of the program. Changes
made to the program in Step 5 may require a repeat of the bench test for all
software, at the PCI’s discretion.
5. Step 5: Project Conclusion (Completion of this step constitutes 25 percent of
programming completion).
a. Startup: Load the SAT database, the HMI graphics, and the PLC program into
the process workstation and appropriate PLC.
b. Provide commissioning support in accordance with Section 01810,
Commissioning.
c.
6. Step 6: As-Built Documentation (Completion of this step constitutes 15 percent of
programming completion).
a. Resubmit final documentation: Submit all as-built documentation updates to
reflect all deviations from the design and submittal documents that occurred during
installation, startup, and acceptance testing.
3.3 OC SAN IN-HOUSE ORIENTATION
A. Each programmer shall participate in a 2-week (5-day workweek) onsite orientation
session under direction of PCI. The orientation is to familiarize the programmer with the
OC SAN Process Control Software Standards, program flowchart, programming tools and
PCI methods and procedures.
3.4 PROGRAM FLOWCHART
A. The Program Flowchart (PF) is a sequential outline of the PLC program. The PF is a
planning tool to be used throughout the programming effort as a map to create the program.
The PF shall be updated regularly and submitted at two programming steps. The Step 2
PF submittal shall include all known programming steps; all programming subsystems; and
DR
A
F
T
PROGRAMMING USING PSA2021-001
OC SAN STANDARDS PROGRAMMING PROFESSIONAL SERVICES
17410-6
all subsystems laid out but not finalized. The Step 3 PF shall be complete except for
modifications required during the subsequent programming steps. The PF is part of the
final as-built deliverable set of Project documentation. Attachment D contains a Sample
Program Flowchart.
B. The programmer shall consider construction sequencing in creating the PF. Several
PFs with associated programming may be required to support continuing process operation
during construction. The programmer may need to write code to temporarily bypass
portions of the final program. Overall control programs shall be created early in the
programming process and shall be modified to support construction sequencing.
C. OC SAN’s acceptance of the PF is for verification of conformance to the OC SAN’s
Process Control Software Standards only. Provide sufficient detail to deliver all specified
functionality.
3.5 SAT DATABASE
A. The SAT database is used as the data source for both the PLC and the HMI databases.
The programmer cannot change/add/delete from the database’s structure and is
responsible for understanding and obeying the field rules as published.
B. Obtain “Seed” Database: During the orientation, obtain from OC SAN an electronic file
of a partially filled-out “seed” SAT database for the Project. Approximately (8) of the (23)
fields in this “seed” database have been filled out by the design engineer to support the
design. These data fields include design information such as alarm points, engineering
units, tag names, etc. as indicated in Attachment A in this Specification section.
C. Complete the Project SAT Database: For each PLC affected by the Project, perform
the following:
1. Update/modify the existing information in the Project SAT database to correct
erroneous information and to reflect the actual/changed Project conditions. Identify
each I/O that is changing from active use to spare; from spare to active use; and/or all
other modifications to the I/O. Delete records removed by Project programming.
2. Add new records and fill out the respective data fields (data cells) to reflect new
Project equipment.
3. Fill out the remaining data fields (data cells) for all the records in the complete 23-
field Project-specific SAT database. Refer to Attachment A SAT Data Dictionary for
more information.
4. Submit the resulting Project-specific SAT database to PCI for acceptance, testing,
acceptance, and integration into the OC SAN master software as specified elsewhere
in this Specification section.
D. Verify Accuracy: The final submitted SAT database shall provide accurate I/O data and
shall reflect the final, tested installation.
3.6 PLC PROGRAM SUBMITTAL
A. Create the development version of the PLC program. All parameters, routines,
subroutines, variables, etc. shall be complete. The process control software submittals
shall be reviewed only for conformance to the OC SAN’s Standards. The logical process
shall be fully tested at acceptance testing.
3.7 BENCH TEST
A. The bench test consists of loading the SAT database, the HMI graphics and the PLC
program into a standalone workstation and PLC, then testing all functions. Perform a
network-by-network review of program interaction. PCI staff may witness the bench test.
Value changes, alarms, HMI graphics, limited simulation of logic and function, and data
DR
A
F
T
PSA2021-001 PROGRAMMING USING
PROGRAMMING PROFESSIONAL SERVICES OC SAN STANDARDS
17410-7
links are reviewed. Errors shall be repaired, and the software shall be certified by PCI for
field installation. Note: Software changes after the bench test are subject to the following
conditions: 1) All changes shall be accepted by PCI in writing before execution. 2) The
bench test is to assure coordination between the PLC logic and the HMI graphics. 3) Any
changes to the process control software after the bench test may result in PCI requiring a
partial or complete retest. PCI involvement will be limited to verifying the linking between
the PLC and HMI graphics and the logic matches the agreed to PF and the SAT database.
PCI may also perform limited functional testing of the software. The software bench test
may be rejected if a pattern of errors is found. Correct all errors and perform an
Unwitnessed bench test internally before resubmitting for the bench test.
B. Create and/or modify the bench test procedures into the acceptance testing
procedures. Create and/or modify the bench test sheets for use during the bench test and
acceptance testing to document the test procedures. ENGINEER will not fully check the
logic or functionality of the software. Attachment C is a Sample Test Sheet.
3.8 COMMISSIONING SUPPORT
A. Provide commissioning support in accordance with Specification 01810,
Commissioning. This specification describes the step-by-step commissioning process
performed by the contractor and includes PCI’s role in commissioning during Pre-ORT,
ORT, Pre-FAT, FAT and PAT. The Programming Professional Services CONSULTANT
will be performing the services performed by PCI.
3.9 FINAL DOCUMENTATION
A. Review and update all documentation to reflect as-built conditions. Remove
documentation that is not current or relevant to the Project. Provide direction on the
method for integrating Project documentation with existing OC SAN documentation
systems.
B. All documentation shall comply with the latest OC SAN Software Standards.
C. Provide electronic files for PCI All documentation organized in logical sub-directories.
3.10 ATTACHMENTS
A. Attachment A - SAT Data Dictionary
B. Attachment B - Sample Technical Memorandum
C. Attachment C - Sample Test Sheet
D. Attachment D - Sample Program Flowchart
E. Attachment E – Section 01810 Commissioning
* * * * * *
DR
A
F
T
SAT DATA FIELD DESCRIPTION TABLE (DATA DICTIONARY)
A. The following listing is a data field description table (data dictionary) for the SAT database. SAT
stands for SCADA Administration Tool. SAT is the tool that helps create and validate the SAT
database itself. This database is the source for both ENGINEER’s and CONTRACTOR’s Real I/O
list and programs. The table describes 26 fields (data cells) that comprise part of the record set in
the SAT database. The text in the Field Description column describes the field data values (data
cell values) expected by OCSD in the finalized database.
B. The Real I/O column with an “X” shall be filled out during the design phase by the ENGINEER
or in the case of a CONTRACTOR programmed PLC, during the construction phase by the
CONTRACTOR during the Step 2 development phase (as defined by Specification 17410 and
17411). The CONTRACTOR shall use this information to generate the construction drawings and
loop diagrams, as well as calibration and setup of instrumentation ranges. Refer to the OCSD
Tagging Procedure (Exhibit D8) for Loop Tag Numbers and OCSD Process Control Software
Standards for further information or contact the OCSD Process Controls Integration (PCI) group for
detailed explanation and examples.
C. The Development column with an “X” shall be filled out during the construction phase by the
programmer. For CONTRACTOR programmed PLCs, fields with an “X” in the Development column
indicate the fields that are updated by the CONTRACTOR.
D. In the case of OCSD programmed PLCs, the SAT Database shall be filled out during the design
phase by the ENGINEER and is given to the CONTRACTOR. The Chapter 13 Attachment A –
Exhibit D8 OCSD Tagging Procedure for Equipment can be provided upon request.
Re
a
l
I
/
O
De
v
e
l
o
p
m
e
n
t
SAT Data Field Description Table
(Data Dictionary)
Field Name Field Description
X X DropIndex Drop index number on a CRISP Data Highway
X X Building Process area name to be defined in consultation with PCI (note: this value
also appears in the alarm summary page for each active and
acknowledged alarm)
X X Reg PLC register number (For Quantum I/O: DO = 0xxxxx, DI = 1xxxxx, AI =
3xxxxx or AO = 4xxxxx; for x80 I/O: DO = -3, DI = -4, AI = -2, or AO = -1)
X X Tag OCSD Loop Tag Number = AASXXXXLLLM_PPP, where AA = Area (10,
11, …), S = Sub-area (A, B, …), XXXX = Function Code (LSHH, PMP, …),
LLL = Block Number (101, 102, …), M = Suffix (A, B, …), _PPP = PCI
modifier (_LVL, _ALM, …(note: real I/O points do not have the PCI
modifier))
X X Desc2 Equipment descriptive name (e.g. FILTER PMP 3 (note: 14-character
max.))
X X Desc3 Description, action, or function of the record (e.g. ON, OPENED, MODE
DISPLAY, … (note: 15-character max.), may also be used to complete
Desc2)
X X RawUnitMin Raw units low for PLC and CRISP analog inputs & outputs (PLC real I/O
typically ranged 0-4095, CRISP typically ranged 0, matches device
minimum range, or a restriction on input or output value)
DR
A
F
T
Re
a
l
I
/
O
De
v
e
l
o
p
m
e
n
t
SAT Data Field Description Table
(Data Dictionary)
Field Name Field Description
X X RawUnitMax Raw units high for PLC and CRISP analog inputs & outputs (PLC real I/O
typically ranged 0-4095, CRISP typically ranged to match device minimum
range, or a restriction on input or output value)
X X EngUnitMin Engineering units low for PLC and CRISP analog inputs & outputs (PLC
real I/O minimum output of device, i.e. 4mA value, CRISP ranged to device
or function)
X X EngUnitMax Engineering units high for PLC and CRISP analog inputs & outputs (PLC
real I/O minimum output of device, i.e. 20mA value, CRISP ranged to
device or function))
X X EngUnit Engineering Units (e.g. GPM, CFM, …)
X Priority Value used for alarm display on CRISP (typically set to ‘1’ for all standard
process alarms, set to ‘2’ for PLC & communications alarms, and ‘3’ for
highly critical process or electrical alarms (note: set to 0 for all non-alarm
records))
X Security Value used for security in CRISP (typically set to a value of ‘4’ for all
standard process selections and setpoints, though there are other levels of
security (See PCI for additional details) note: only used for records that are
CRISP outputs to PLCs, set to 0 for all other records)
X Alarm The bit that configures CRISP to alarm (set to ‘TRUE’ for alarms, set to
‘FALSE’ for all other records)
X History The bit that designates a tag to be historized on the Enterprise Historian
(set to ‘TRUE’ for all records required to historized, set to ‘FALSE’ for all
other records (note: alarms, as well as operator process selections and
setpoints are automatically added to the Enterprise Historian, do not set
these records to ‘TRUE’))
X Trend The bit that designates a tag made available for trending in CRISP (set to
‘TRUE’ for all values that appear on a CRISP trend window, set to ‘FALSE’
for all other records)
X PIDNumber Informational field, displaying on which P&ID a real I/O is point is identified
(e.g. 20E-NP-110)
X Panel Number Informational field, displaying at which RIO panel a real I/O point is
terminated (e.g. 15LFCP949C)
X PLCDrop Informational field, displaying at which RIO drop a real I/O point is
terminated (typically 1)
X PLCRack Informational field, displaying at which RIO rack a real I/O point is
terminated
X PLCSlot Informational field, displaying on which RIO card a real I/O point is
terminated
X PLC Point Informational field, displaying at which RIO card point a real I/O point is
terminated (set to the point number on the card (e.g. 1-16 on a 16-point
card DI card, 1-4 on a four-point card AO card, 1-9 on an eight-point AI
card (note: AI cards typically reserve the 9th point (and corresponding
register) for a “MODULE STATUS CHANNEL”, and will be reserved in
SAT)))
X CardType Informational field, displaying which Real I/O point Unity Card Type is
identified as (e.g. BMXDAI1614 - 16 point digital input - 120VAC card)
DR
A
F
T
Re
a
l
I
/
O
De
v
e
l
o
p
m
e
n
t
SAT Data Field Description Table
(Data Dictionary)
Field Name Field Description
X CRISPRegType Defines an record as it relates to its CRISP I/O type (set to ‘4’ for all CRISP
DO points (typically 002001-004000 registers), ‘3’ for all CRISP DI points
(typically 004001-005000), ‘2’ for all CRISP AI points (typically 404001-
406000), and ‘1’ for all CRISP AO points (typically 402001-404000) (note:
set to ‘0’ for all non-CRISP I/O records))
X X PLCRegType Defines an record as it relates to its PLC register type (set to ‘1’ for all real
analog inputs (typically 100001-101999 registers), ‘2’ for all real analog
outputs (typically 400001-402000 registers), ‘3’ for all real digital inputs
(typically 300001-301999 registers), ‘4’ for all digital outputs (typically
400001-402000 registers), ‘5’ for all communications registers (typically
006609-007000 & 406601-407000 registers), ‘6’ for all internal registers
(typically 007001-009999 & 407001-409999 registers) (note: set to ‘0’ for
all CRISP I/O records))
X CMMS Desc Informational field, displays the information contained in EID for the real I/O
registers (a concatenation of several fields within EID)
* * * * * *
DR
A
F
T
3/23/2020 – Rev. 6 1
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
M E M O R A N D U M
To: Frank Steiger/OCSD
From: GEA Westfalia Separator Division
Subject: Technical Memorandum for P1-101 Dewatering Centrifuge Control
Software Configuration
Date: September 2, 2020 Redacted
Summary
This Technical Memorandum has been redacted to remove proprietary information and
shall only be used as an example for preparation of similar documentation. It describes
the control implementation and software configuration for the new Dewatering
Centrifuge system. The software portion of the project will include PLC ladder logic
written using the District’s existing Software Standards, as well as new operator
interface screens using the District’s Graphics Standards.
Control Strategy Overview
Each of the three Dewatering Centrifuges will be provided with a free-standing
programmable logic controller (PLC) based control cabinet to contain the machines’
start/stop, and sequencing controls as well as monitoring and safety/shutdown systems.
Each centrifuge will operate independently, and all three will be programmed to function
identically.
The centrifuges can be operated in two modes. The two control modes are LOCAL and
REMOTE. In both modes, the system protection will be provided by monitoring
centrifuge parameters (vibration, temperature, etc.) for safety/shutdown set points. A
LOCAL/REMOTE selector switch on each control panel selects between these two
options.
LOCAL Mode
In LOCAL mode, centrifuge control is only available at the CCP. And centrifuge
Start/Stop is only available at the CCP
REMOTE Mode
In REMOTE mode, centrifuge control is only available at the CCP. But Start/Stop is
only available from SCADA.
3/23/2020 – Rev. 6 2
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
DEWATERING CENTRIFUGE DETAILS
1. Introduction
1.1. CONTROL PANELS
The CA-1035 Control System will consist of the following control panels:
Three (3) - Centrifuge Motor Control Center (CMCC) Panels - NEMA 12, fan/filter
enclosure
Three (3) - Centrifuge Control Panels (CCP) - NEMA 12, fan/filter enclosure
Note: Lube oil pump motor starters are located in the Customer supplied MCC
1.2. PROGRAMMABLE LOGIC CONTROLLER (PLC)
The PLC is configured for the following:
Full automation of the Centrifuge system
The PLC shall be programmed to operate on an independent basis, regardless of the
communication status of the Plant Dewatering PLC.
Each PLC shall include integrally, or with additional modules, communication ports
for the programming device, I/O hardware, and any required remote communication
modules and retransmission as required, to provide fully functional links to I/O
hardware and SCADA.
I/O communications shall employ the manufacturer’s standard design for
transmission speed, media length, and cabling.
2. PRODUCTS AND SYSTEM DESIGN
2.1. PLC HARDWARE/SOFTWARE
The centrifuge PLC shall be programmed using Proworx NXT programming software,
version 2.20 or later.
The centrifuge OIT shall be programmed using Modicon Vijeo Designer programming
software, version 6.2, Service Pack 5.
The PLC shall be programmed to operate on an independent basis, regardless of the
communication status of SCADA.
The PLC will be a Modicon Quantum 140CPU53414B processor module.
The PLC power supply will be selected based on the total PLC I/O count.
The PLC rack/chassis will consist of three (3) 10-slot chassis.
Discrete input modules shall be 120 VAC, 16 inputs, isolated.
Discrete output modules shall be relay, 8 outputs.
Analog input modules shall be 8-channels, isolated.
Analog output modules shall be 4-channel, isolated.
RTD input modules shall be 8-channel, isolated, and wired for 3-wire, PT 100 RTD’s.
Three (3) Ethernet network interface modules, NOE 771 11, shall be provided. Two
shall be dedicated for interfacing to SCADA and one shall be dedicated for
interfacing to the Centrifuge OIT, Bowl and Scroll VFDs.
The Operator Interface Terminal (OIT) shall be a Magelis Panel PC, model HMI
PPH9A0701, 19”, color, touch screen, with built-in Ethernet 10/100 Mbps
communications port.
2.2. SYSTEM ARCHITECTURE
The CCP shall be designed to:
3/23/2020 – Rev. 6 3
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
- Assist plant operating personnel by noting and announcing off-normal operating
conditions and equipment failures
- Perform calculations based on sensor inputs
- Communicate with SCADA via Modbus TCP/IP Ethernet network
The PLC program will be divided into subroutines for each specific function of the
system.
2.3. COMMUNICATIONS
The Quantum PLC system utilizes separate communications modules for the required
network interfaces as follows:
- The CCP shall communicate with the owner’s SCADA via two dedicated NOE
771 11 modules, utilizing an Modbus TCP/IP Ethernet network interface
- The CCP shall communicate with the Centrifuge OIT and VFDs via a dedicated
NOE 771 11 module and 8-port Ethernet switch utilizing a Modbus TCP/IP
Ethernet network interface.
- The CCP shall utilize one of the spare ports on the Ethernet switch for
connecting a pc programming terminal.
2.4. PLC DATABASE AND I/O LIST
The structure of the system PLC database shall be hierarchical, and initial
configuration of the database shall be performed by GEA. Signals required for
interface with SCADA shall be organized into a separate subroutine, in which discrete
and analog I/O addresses can be read from and written to the CCP.
I/O List - The I/O list will be provided with the GEA “as built” electrical drawing
package.
3. CENTRIFUGE SEQUENCE
3.1. CENTRIFUGE START
A LOCAL/REMOTE selector switch is located on the CCP. In either mode, centrifuge
control is only available at the CCP. In LOCAL mode, centrifuge Start and Stop is only
available at the CCP. In REMOTE mode, Centrifuge Start and Stop is only available from
SCADA. When the selector switch is in the Remote position, the CCP issues a SYSTEM
REMOTE confirmation to SCADA. Note: The centrifuge SYSTEM READY (Power on and
no shutdown alarms) signal must be active in order to start the centrifuge.
The Centrifuge control system verifies that no fault conditions exist and maintenance mode
is not active. The start-up sequence of the centrifuge is initiated by pushing the
CENTRIFUGE START button on the CCP (LOCAL) or SCADA (REMOTE). The user may
cancel the operation, if the start button was pressed accidentally, by pushing the
CENTRIFUGE STOP button on the CCP (LOCAL) or SCADA (REMOTE).
The centrifuge is in the READY state and the CCP issues a hard-wired SYSTEM
READY permissive signal to SCADA.
Depressing the CENTRIFUGE START pushbutton will de-energize and open the feed
tube, seal water valve to begin seal water flow to the centrifuge.
After confirming seal water flow is established, a 10-minute (operator set point) pre-
lube cycle begins, and lube motor run commands are issued. Both lube systems will
be commanded to run at the same time.
After confirming that the lube motors are operational, the cooling water solenoid valves
for each lube system’s heat exchanger are energized. This will open the valves to
allow cooling water to each heat exchanger.
3/23/2020 – Rev. 6 4
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
After the Pre-lube cycle is finished the bowl motor run command is issued to the bowl
VFD, and the bowl begins to rotate. The bowl will be ramped up to setpoint speed by
the VFD in approx. 25 minutes.
After confirmation that the bowl VFD is running, and the bowl speed is above 370 RPM
(operator set point), the scroll motor run command is issued, and the scroll begins to
rotate.
The centrifuge is now running and the CCP issues a SYSTEM ON confirmation to
SCADA.
Normally the diverter gate is closed if centrifuge is not processing. With the diverter
gate CLOSED the cake pump is bypassed.
Normally the diverter gate flush valve is closed. When the bowl motor speed greater
than zero, CCP will open the diverter gate flush valve, if the diverter gate is in the
closed position. Note: SCADA will control the operation of the screw feeder and cake
piston pump.
During this start cycle, the scroll will convey any remaining solids out of the bowl before
the bowl has reached full speed, and therefore the Centrifuge torque will drop to low
torque value (less than 10%) indicating that the bowl has very little solids remaining.
Once the centrifuge has reached speed and there are no faults, the Centrifuge is ready
to accept sludge feed (Ready for Feed signal activated) and issues a hard-wired
SYSTEM FEED permissive signal to SCADA.
SCADA will transmit a PLANT FEED hard-wired signal to the CCP when the sludge
feed system components (sludge pump, polymer pump, grinder, etc.) are confirmed in
operation. Refer to Process Sequence for the process start sequence and ancillary
operation.
Note 1: If there is no sludge fed to the Centrifuge for 30 minutes (operator set
point), then Idle mode is active until sludge feed is started. Refer to 3.5 Feed
System Off for additional detail.
3.2. CONTROLLED SHUTDOWN
A controlled shutdown will be initiated when the user presses the CENTRIFUGE STOP
button on the CCP (LOCAL) or SCADA (REMOTE), if Flush and Shutdown is Disabled. It
will also be triggered by some alarm shutdown conditions. See Appendix A for a list of
alarm conditions that cause a shutdown.
Refer also to Flush & Shutdown and CIP Sequences
SYSTEM FEED permissive signal removed by centrifuge PLC (Ready for Feed
signal off). Note: The SYSTEM FEED permissive signal can also be removed,
without shutting down the centrifuge, by actuating the Feed Off pushbutton from
the centrifuge OIT.
The PLANT FEED signal (derived from grinder, polymer pump, sludge feed pump,
and sludge feed valve) at the PLANT Dewatering PLC, to the CCP is removed.
Bowl motor shuts off, allowing the bowl to coast to a stop. The scroll motor will
continue to run.
Flush water valve opens immediately when bowl motor shuts off.
Flush water valve closes when bowl speed falls below 200 rpm.
Scroll motor shuts off when bowl speed is below 289 rpm.
Bowl and scroll come to rest.
The CCP removes the SYSTEM ON signal confirmation signal to SCADA, when
bowl is off, scroll is off, and CIP is complete.
Lube pumps continue to run during post lube cycle (approx. 5 minutes).
When post lubrication is complete, seal water solenoid valve is energized and
closes to shut off feed tube seal water.
3/23/2020 – Rev. 6 5
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
3.3. IMMEDIATE SHUTDOWN
An immediate shutdown is triggered by scroll motor alarms. See Appendix A for a list of
all alarm conditions that cause an immediate shutdown. An Immediate Shutdown will
function similar to a controlled shutdown; except that the scroll motor will be turned off at
the same time as the bowl motor.
3.4. EMERGENCY SHUTDOWN
The Emergency Shutdown is issued with any of the E-stop pushbuttons at the CCP, Bowl
CMCC, Scroll CMCC, or station near stairs. All equipment associated with the system will
be stopped instantaneously with no flush water. All centrifuge E-stop’s will require a
manual reset of first the E-stop push button pressed and then also the E-stop safety relay
located in the CCP. A bowl speed high condition will also trigger the E-stop safety relay.
NOTE: Seal water will remain on until the bowl and scroll come to a rest (less than
25 rpm).
3.5. FEED SYSTEM OFF
3.5.1. Feed System Off – Idle Mode (Non-Alarm)
When the centrifuge has been requesting feed from the PLANT Thickening PLC for 30
minutes without being fed, the centrifuge will begin an idle flush sequence. The centrifuge
continues to request sludge feed, but opens the flush water valve for an operator
configurable duration (typically 2 minutes). This flush water valve open sequence will
repeat every 30 minutes until sludge feed begins.
3.5.2. Feed System Off – Idle Mode (Alarm)
After 2 minutes of no-feed, with FEED A/M station in Auto, the centrifuge generates a NO
Feed Alarm.
After 60 minutes of no-feed, with FEED A/M station in Off, generates a “System Feed
Control Station is OFF” Alarm.
Certain system alarms or an operator request will require that the feed system stop, while
the centrifuge continues to run. See Appendix A for a list of all alarm conditions that
cause a Feed Off condition.
The sludge feed to the centrifuge is stopped via an alarm or activating the Feed
Off pushbutton from the centrifuge OIT.
SYSTEM FEED permissive signal removed by centrifuge PLC (Ready for Feed
signal off).
The PLANT FEED signal (derived from grinder, polymer pump, sludge feed pump,
and sludge feed valve) at the PLANT Dewatering PLC, to the CCP is removed.
If the centrifuge continues to run, but sludge feed is not active, the flush water valve
will open for 5 minutes every 30 minutes (typically, operator adjustable).
Upon restarting (if applicable), the Centrifuge PLC re-issues the SYSTEM FEED
permissive signal to SCADA.
Grinder, Sludge feed and Polymer feed are restarted by SCADA. Sludge feed
valve also reopened by SCADA. SCADA re-issues the PLANT FEED signal to the
CCP.
Note: Torque Alarm HI and Vibration Alarm HI will initiate a Feed System
Off (SYSTEM FEED permissive removed) sequence as noted above. The
flush valve will remain open for 5 minutes (typical, operator adjustable). If
the torque or vibration level drops below the alarm setpoints during the
flush cycle, these alarms can be reset by the operator, thus allowing the
3/23/2020 – Rev. 6 6
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
flush water valve to close. The sludge feed will then be permitted to be
restarted.
3.6. FLUSH & SHUTDOWN SEQUENCE
If the process sequence is completed and it is desired to shut down the centrifuge, then
press the centrifuge Stop button (Local or Remote). If the Flush & Shutdown sequence, is
Enabled from the OIT (LOCAL) or SCADA (REMOTE), then the flush and shutdown
sequence will be performed with a stop command. If flush and shutdown is disabled, then
the equipment will stop without flushing and cleaning. The sequence is as follows:
Centrifuge currently running process
Operator ensures the Flush & Shutdown is Enabled on the OIT or Centrifuge
Stop at SCADA. Once stop is initiated, flush and shutdown will proceed
automatically.
SYSTEM FEED signal removed by the CCP to SCADA.
Sludge Pumps, Polymer Feed Pumps and Grinder are sequenced off by SCADA
as described under Process Sequence. PLANT FEED signal removed by
SCADA to the CCP.
Scroll runs at a preset fixed speed.
Centrifuge Flush Valve is opened.
When torque drops below the FLUSH WATER OFF torque setpoint (typically 25%),
the centrifuge flush valve will close.
The CCP will remove the SYSTEM OPEN command to SCADA and the diverter
gate will close and CCP will open the diverter gate flush valve.
The centrifuge will then automatically sequence into the CIP cleaning cycle
described below.
3.7. CLEAN IN PLACE (CIP)
The centrifuge will execute a cleaning sequence, also known as CIP (Clean-In-Place),
after the flush and shutdown sequence has been completed, or the operator initiates the
CIP sequence by pressing the CIP Start pushbutton on the OIT. Note: This function is
not available from SCADA. The sequence for one cycle is as follows:
Number of CIP cycles is set to greater than zero (typically 3).
The Flush & Shutdown sequence is completed or the <CIP START> pushbutton
is activated from the OIT or SCADA.
Flush valve is opened, until the bowl speed drops below 200 rpm.
The centrifuge bowl decelerates to a preset CIP Lower Bowl Speed Limit (approx.
100 rpm, operator adjustable).
Differential Speed is set to run 50% of range.
Centrifuge Flush Valve is closed below 200 rpm bowl speed.
Once the bowl speed reaches the CIP Lower Bowl Speed Limit, the bowl flush
valve is opened above 200 rpm.
Once the CIP Upper Bowl Speed Limit (approx. 500 rpm, operator adjustable) is
reached, the bowl decelerates to the preset CIP Lower Bowl Speed Limit level and
the cycle will repeat itself as many times as the operator has configured the per
the CIP cycle SP
Upon completion of the last CIP cycle, the centrifuge will coast down to a stop and
follow a normal shutdown, including post-lube.
3/23/2020 – Rev. 6 7
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
4. Centrifuge Equipment
4.1. BOWL MOTOR (15MCEN121/221/321)
Starting and stopping of the bowl motor will be from the centrifuge PLC at the CCP.
Manual Operation (Maintenance Mode):
The bowl motor can be started/stopped from the OIT bowl motor control A/M
station. When the Centrifuge is stopped or off, Maintenance mode can be
selected. Then, pressing the START button will start the bowl motor. Note: Due
to machine safety reasons, the bowl motor will only be permitted to run for a
maximum of 10 seconds before shutting off. Pressing the STOP button will stop
the scroll motor.
Automatic Operation (Normal Mode):
First ensure that Normal Mode and AUTO has been selected from the OIT bowl
motor control A/M station. The bowl will start when the pre lube is complete. It will
run until the centrifuge stop button has been pressed and the process is off. Refer
also to Centrifuge Sequence.
The bowl motor will stop when:
Controlled stop is issued
Immediate stop is issued
Emergency stop is issued
4.2. SCROLL MOTOR (15MCEN131/231/331)
Starting and stopping of the scroll motor will be from the centrifuge PLC at the CCP.
Manual Operation (Maintenance Mode):
The scroll motor can be started/stopped from the OIT scroll motor control A/M
station. When the Centrifuge is stopped or off, Maintenance mode can be
selected. Then, pressing the START button will start the scroll motor. Note: Due
to machine safety reasons, the scroll motor will only be permitted to run for a
maximum of 10 seconds before shutting off. Pressing the STOP button will stop
the scroll motor.
Automatic Operation (Normal Mode):
First ensure that Normal mode and AUTO has been selected from the OIT scroll
motor control A/M station. The scroll motor will start when the pre lube is complete
and bowl speed has reached 289 rpm. It will run until the centrifuge stop button
has been pressed and bowl speed is less than 289 rpm. Refer also to Centrifuge
Sequence.
The scroll motor will stop when:
Immediate stop is issued
Controlled stop is issued and bowl speed is less than 289 rpm
Emergency stop is issued
3/23/2020 – Rev. 6 8
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
4.3. FLUSH WATER SOLENOID VALVE (15MFY157/257/357)
Opening and closing of the flush water valve will be from the centrifuge PLC at the CCP.
Manual Operation:
The flush water valve can be opened/closed from the OIT flush water valve control
A/M station. Pressing the OPEN button will open the flush water valve and
pressing the CLOSE button will close the flush water valve. Emergency stop will
close the valve.
Automatic Operation:
First ensure that AUTO has been selected from the OIT flush water valve control
A/M station. The flush water will turn on when:
Centrifuge Start-up – the valve will open for a set amount of time (typically
5 minutes, operator adjustable), when bowl speed has reached a set level,
(typically 700 rpm, operator adjustable).
Idle mode – when the centrifuge is running at speed, but process is not
active (not feeding), the flush water valve will open for 5 minutes every 30
minutes.
Centrifuge Shutdown (Controlled or Immediate) – the valve will open when
a shutdown has been initiated and will remain on until the bowl speed
drops below the FLUSH WATER OFF setpoint.
Flush & Shutdown – the valve will open when Flush & Shutdown is enabled
and the feed is stopped, and torque is above the preset level. Refer also
to Flush & Shutdown Sequence.
CIP – the valve will open when CIP is active above the FLUSH WATER
OFF setpoint. Refer also to CIP Sequence.
High Torque alarm – the valve will open for a set amount of time (typically
120 seconds, operator adjustable). Refer also to Appendix D –
PRESETS AND SECURITY SETUP for alarm settings.
High Vibration alarm – the valve will open for a set amount of time (typically
120 seconds, operator adjustable). Refer also to Appendix D –
PRESETS AND SECURITY SETUP for alarm settings.
Note: Emergency stop will position the valve closed in Automatic operation.
4.4. SEAL WATER SOLENOID VALVE (15MFY155/255/355)
Opening and closing of the seal water valve will be from the centrifuge PLC at the CCP. It
should be noted the seal water valve is fail-open, energize to close.
Manual Operation (Maintenance Mode):
In Maintenance Mode, the seal water valve can be opened/closed from the OIT
seal water valve control A/M station. Pressing the OPEN button will open (de-
energize) the seal water valve and pressing the CLOSE button will close (energize)
the seal water valve.
Automatic Operation (Normal Mode):
First ensure that Normal Mode and AUTO has been selected from the OIT seal
water valve control A/M station. The seal water will open (de-energize) when:
Centrifuge Start-up – the valve will open when the centrifuge START
button has been pressed.
The seal water will close (energize) when:
Centrifuge Shutdown (Controlled or Immediate) – the valve will close when
bowl speed is zero and after an off delay timer is complete.
Refer also to Centrifuge Sequence.
3/23/2020 – Rev. 6 9
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
4.5. LUBE OIL PUMP MOTORS (SOLIDS – 15MPMP140/240/340, LIQUIDS –
15MPMP147/247/347)
Starting and stopping of the lube oil pumps will be from the centrifuge PLC at the CCP.
Manual Operation (Maintenance Mode):
Each of the two lube pump motors can be individually started/stopped from the
OIT lube pump motor control A/M station (liquids-side or solids-side). Selecting
Maintenance mode, then pressing the START button will start the lube pump
motor. Pressing the STOP button will stop the lube pump motor.
Automatic Operation (Normal Mode):
First ensure that Normal Mode and AUTO has been selected from the appropriate
OIT lube pump motor control A/M station. The lube pump motors will start and
associated cooling water solenoid valves will open when the centrifuge start button
has been pressed. Both pump motors will continue to run until the post lube timer
is done. Refer also to Centrifuge Sequence.
The lube pump motors will stop when:
Emergency stop is issued
Lube pump motor fault (overload or fail to run)
Note: Lube oil instrumentation alarms noted in Appendix A will cause a
centrifuge controlled shutdown
4.6. LUBE OIL SYSTEM COOLING SOLENOID VALVES (SOLIDS –
15MFY146/246/346, LIQUIDS – 15MFY153/253/353)
Opening and closing of the lube oil, cooling valves will be from the centrifuge PLC at the
CCP.
Manual Operation (Maintenance Mode):
Each of the lube oil cooling water valves can be opened/closed from the OIT from
the lube oil cooling water valve control A/M station (liquids-side or solids-side)
when in Maintenance mode. Pressing the OPEN button will open the lube oil
cooling water valve and pressing the CLOSE button will close the lube oil cooling
water valve.
Automatic Operation (Normal Mode):
First ensure that Normal Mode and AUTO has been selected from the appropriate
OIT lube oil cooling water valve control A/M station. The lube oil cooling water
valves will open when:
Centrifuge Start-up – the valves will open when the centrifuge START
button has been pressed and confirmation that the lube oil pump is running
has been received by the centrifuge PLC.
The lube oil cooling water valves will close when:
Centrifuge Shutdown (Controlled or Immediate) – the valve will close when
the post lube timer is done and the lube has turned off.
Refer also to Centrifuge Sequence.
5. SCROLL CONTROL LOGIC
The Centrifuge control system is designed with a proprietary SJM Scroll Control Module (SCM).
This module allows the centrifuge to operate in either torque control or fixed differential speed
control.
3/23/2020 – Rev. 6 10
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
5.1. SJM SCROLL CONTROL
The Westfalia SJM control algorithm is used to compute the necessary differential speed
to maintain the torque setpoint. It can also be used to run at a fixed differential speed
The following set points are used for SJM control:
Control Begin (starting torque)
Basic Differential Speed
Control Gradient
Refer also to APPENDIX E – CENTRIFUGE FORMULAS AND CALCULATIONS for additional
info.
6. PROCESS SEQUENCE (NORMAL MODE ONLY)
The ancillary equipment is supplied by others and controlled by the CCP or SCADA, with certain
interlocks as noted below. The centrifuge must first be up to speed and ready for feed before the
process start sequence is initiated.
The ancillary equipment includes:
a) Grinders
b) Polymer Feed Pumps
c) Sludge Feed Pumps
d) Diverter Gate
e) Diverter Gate Flush Valve
f) Screw Feeder/Cake Piston Pump
6.1. PROCESS START SEQUENCE
Centrifuge ancillary equipment can be started when the centrifuge is ready for feed. The
centrifuge is at speed and transmits a hard-wired, SYSTEM FEED permissive signal to
SCADA to start all ancillary equipment in the proper sequence. Sludge and Polymer feed
rates will be controlled by SCADA. Sludge and Polymer feed rate setpoints are entered
from SCADA.
Diverter gate is closed.
Diverter gate flush valve is open.
Centrifuge ready for feed signal is indicated on the OIT. CCP transmits a hard-
wired, SYSTEM FEED permissive signal transmitted to SCADA.
Polymer system, grinder and sludge feed pump sequenced on by SCADA. Note:
SCADA will ensure that the sludge feed valve is in the open position prior to starting
the sludge feed pump.
SCADA confirms all ancillary equipment is running and transmits a hard-wired,
PLANT FEED confirmation to the CCP.
Sludge feed rate is set at SCADA, and PID flow control is performed by SCADA.
Sludge flow rate feedback is displayed on the OIT via hard-wired signal from the
sludge feed flow meter.
Scroll Torque is above the TORQUE/DIVERTER GATE OPEN set point on the OIT
for a preset time.
CCP transmits a SYSTEM OPEN hard-wired signal to SCADA and the diverter
gate is opened. Note: If the diverter gate fails to open, SCADA will generate a
diverter gate fail to open alarm and remove the PLANT FEED confirmation to the
CCP. This will stop the grinder, polymer pump and sludge feed pump from
continuing to feed the centrifuge.
CCP closes the diverter gate flush valve.
3/23/2020 – Rev. 6 11
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
The Sludge Feed Density Meter will provide a solids concentration signal, via
SCADA, for display on the OIT.
6.2. PROCESS STOP SEQUENCE
Pressing the OFF button, on the OIT System Feed Control Station will stop the ancillary
equipment from running. This does not stop the Centrifuge, only the sludge processing.
Refer also to Flush & Shutdown Sequence as the recommended sequence for process
stopping.
CCP removes the SYSTEM FEED permissive signal to SCADA.
SCADA sequences off the polymer system, grinder and sludge feed pump. The
sludge feed valve is also closed.
SCADA removes the PLANT FEED confirmation signal to the CCP.
Scroll Torque is below the TORQUE/DIVERTER GATE CLOSE set point for a
preset time.
CCP removes the SYSTEM OPEN hard-wired signal to SCADA and the diverter
gate is closed.
CCP opens the diverter gate flush valve.
SCADA will control the operation of the screw feeder/cake piston pump.
7. PROCESS EQUIPMENT
7.1. GRINDERS (BY OTHERS) (15MGDR010/020)
SCADA will control the operation of the Grinder.
Manual Operation:
From SCADA
Automatic Operation:
When the CCP transmits the SYSTEM FEED signal to SCADA, SCADA will
sequence on the grinder after an adjustable preset time delay. It will shut down
when Feed Off button is actuated, the SYSTEM FEED permissive is removed,
flush & shutdown is activated, normal shutdown, or if any feed-off or shutdown
alarms are active.
Interlocks:
The grinder will stop when:
The SYSTEM FEED signal is not active
Emergency Stop
7.2. POLYMER FEED PUMPS (BY OTHERS) (15MPMP910/920/930)
SCADA will control the operation of the Polymer Feed Pumps. Polymer ratio setpoint is
entered from SCADA.
Manual Operation:
From SCADA.
Auto Operation:
When the CCP transmits the SYSTEM FEED signal to SCADA, SCADA will
sequence on the polymer pump after an adjustable preset time delay. It will shut
down when the Feed Off button is actuated, the SYSTEM FEED permissive is
removed, flush & shutdown is activated, normal shutdown, or if any feed-off or
shutdown alarms are active. Polymer ratio control will be performed by SCADA.
3/23/2020 – Rev. 6 12
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Interlocks:
The polymer feed pump will stop when:
The SYSTEM FEED signal is not active
Emergency Stop
7.3. POLYMER FEED FLOW METERS (BY OTHERS) (15MFIT159/259/359)
SCADA will use the polymer feed flow meters to control polymer flow to the centrifuge. The
polymer flow meters are provided with an additional hard-wired connection to the CCP for
display on the OIT.
7.4. SLUDGE FEED PUMPS (BY OTHERS) (15MPMP100/200/300)
SCADA will control the operation of the Sludge Feed Pumps. Sludge feed flow rate setpoint
is entered from SCADA.
Manual Operation:
From SCADA.
Auto Operation:
When the CCP transmits the SYSTEM FEED signal to SCADA, SCADA will
sequence on the sludge pump after an adjustable preset time delay. It will shut
down when the Feed Off button is actuated, the SYSTEM FEED permissive is
removed, flush & shutdown is activated, normal shutdown, or if any feed-off or
shutdown alarms are active. Sludge feed PID flow control will be performed by
SCADA.
Interlocks:
The sludge feed pump will stop when:
The SYSTEM FEED signal is not active
Emergency Stop
7.5. SLUDGE FEED FLOW METERS (BY OTHERS) (15MFIT119/219/319)
SCADA will use the sludge feed flow meters to control sludge flow to the centrifuge. The
sludge flow meters are provided with an additional hard-wired connection to the CCP for
display on the OIT.
7.6. DIVERTER GATES (BY OTHERS) (15MGAT506/526/546)
Automatic operation of the opening/closing of the Diverter Gate will be from the centrifuge
PLC at the CCP. There will be no manual operation of the diverter gate from the OIT. Local
manual operation is performed by SCADA or from the local control station.
Manual Operation:
From SCADA.
Automatic Operation:
The diverter gate is automatically started in the closed position when the centrifuge
starts. When the torque is above the TORQUE/DIVERTER GATE OPEN set point
for a preset time, the CCP will transmit a SYSTEM OPEN request to SCADA and
the diverter gate will open. CCP will then remove the open command to the
diverter gate flush water valve. When the process is stopped or on shutdown, and
the torque falls below the TORQUE/DIVERTER GATE CLOSE set point for a
preset time, after an operator adjustable timer, the CCP will remove the SYSTEM
3/23/2020 – Rev. 6 13
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
OPEN command to SCADA and the diverter gate will close. CCP will then open
the diverter gate flush valve. The diverter gate will remain closed and the diverter
gate flush valve will close when the centrifuge is off.
Interlocks:
The diverter gate will close when:
Centrifuge is off
Emergency Stop
PLANT FEED signal not active
7.7. DIVERTER GATE FLUSH WATER SOLENOID VALVES (BY OTHERS)
(15MFY502/522/542)
Opening and closing of the diverter gate flush water valve will be from the centrifuge PLC
at the CCP.
Manual Operation:
The diverter gate flush water valve can be opened/closed from the OIT diverter
gate flush water valve control A/M station. Pressing the OPEN button will open
the diverter gate flush water valve and pressing the CLOSE button will close the
diverter gate flush water valve.
Automatic Operation:
First ensure that AUTO has been selected from the OIT diverter gate flush water
valve control A/M station. The diverter gate flush valve will open when the diverter
gate is closed and close when the diverter gate is open.
7.8. SCREW FEEDER/CAKE PISTON PUMP (BY OTHERS) (15MPMP500/520/540)
Operation of the Screw Feeder and Cake Piston Pump will be by SCADA.
OPERATOR INTERFACE GRAPHIC SCREENS
A total of sixty-two (62) OIT graphics will be created for the P1-101 Dewatering
Centrifuge System project. These screens are shown in this description. The types of
screens and their quantities are as follows:
Number of Screens Screen Description
1 OCSD Main Menu Screen
3 Process Graphics Menu Screen
1 Process Graphic Overview
3 Process Graphic Screens (1 each, Centrifuge)
3 Process Graphic Screens (1 each, Lube System)
1 Centrifuge Select Menu Screen
3 Centrifuge Detail
27 Centrifuge Control Station Screens (9 ea. Cent.)
3 Centrifuge Trend Screen (1 ea. Cent.)
3 Runtime Screen (1 ea. Cent.)
3/23/2020 – Rev. 6 14
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
1 Alarm Screen
9 Configuration and Set Point Screens (3 ea. Cent.)
1 System Menu Screen
1 PLC Status Screen
1 Help Screen
1 Manufacturer’s Information Screen
Note: For this submittal 1 of each screen for Centrifuge 1 is included. The remaining
screens are duplicates from Centrifuge 1 and look the same.
3/23/2020 – Rev. 6 15
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Dewatering Centrifuge OIT OCSD Main Menu Screen
The screen below represents the OCSD Main Menu screen.
From this screen the operator can navigate to:
Process Graphics Menu Screen for each Centrifuge.
System Menu Screen
Help Screen
[mm~~
CinllTI ORANGE COUNTY SANITATION DISTRICT l.111,l/•I,
3/23/2020 – Rev. 6 16
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
This screen allow selection of displaying Centrifuge 1, 2, or 3.
F'l>'l!TI DEWATERING CENTRIFUGES '''l.'Ell'_F,ll
<J I> ~ CENT-1 CENT-2 CENT-a
3/23/2020 – Rev. 6 17
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Dewatering Centrifuge Overview Screen
This screen displays the status of all 3 centrifuges.
From this screen the operator can navigate to:
Process Graphics Menu Screen for each Centrifuge.
System Menu Screen
Help Screen
~[mm~
,,CCI DEWATERING CENTRIFUGES ,_l·['IFIJ '· I
II GPII
POLVIIER
I GPII
..... -------------=::::"',,;
II GPII RPM
POLYIIER
I GPII
..... -------------==
II GPII RPM
POLYMER
'--------------==
1.6 'v <J C> IIENU CDIT-1 CDIT-2 CDIT-3
3/23/2020 – Rev. 6 18
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Process Graphics Menu Screen
The screen below represents the menus screen which allows quick navigation to the
screens identified on the screen list.
Cl,-IITI C1 PROCESS GRAPHICS MENU "I l"rEIII l,IEIII' ol,lrl
~ V <J [> IENU CDIT-1 IZNT-2 IZNT-3
3/23/2020 – Rev. 6 19
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Centrifuge Process Graphic Screen
The Dewatering Graphics Screen is shows the centrifuge with data from the primary
components.
This example screen shows several conditions which could exist for the centrifuge, but
would not necessarily exist simultaneously.
The symbols for the screen are animated with standard District color codes to show their
status (red = on, green = off, blue = out of service).
,Hel DEWATERING CENTRIFUGE 1 :, C[il!Coil
II GPII
BOWL POLYMER
FSL D
II ■
SCROLL
a
■
RLtlTil'I!: tELP
3/23/2020 – Rev. 6 20
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Lube Oil System Graphic
The Oil Lube System Overview displays the oil lube pumps and the oil cooling water
valves. The sample is shown below.
AREAi-LUBE OIL SYSTEM a_l D, i'E111_CGU,
LSL
CENTRIFUGE
LJQUDSDE
BEARING
CEN
OLRETURN OLSUPPLY
-PSL
FSL --FSL
UOUIOSDE
LUBEOIL
RESERVOIR
LS LUBE PUMP POSH ~ C
FSL ~ r
COOUNG
WATER
RETURN
CENTRFIJGE
SOI.DSDE IIEAMIG
CEN
OLRETURN OLSUPPLY
-PSL
FSL --FSL
SOUDSDE
LUIEOL
RESERVOIR
SS LUBE PUMP POSH
~
C
FSL O" I
LUIEOL
COOl.£R l
COOUNG
WATER
RETURN
~ V @J'---C>__. __ 11ENU __ ..__-__ c_._ ___ ...._ ___ .._ _____ ._CONl'I __ 11URt:_..__r_REHDS __ ._ __ ___. ___ _._ ___ ....__RUHT __ 111E_..__HELP ____ ._ ..
3/23/2020 – Rev. 6 21
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Centrifuge Detail
The centrifuge detail screen will display the current parameter readings of the
centrifuge. A sample of this display is shown below.
This detail screen displays the following:
Centrifuge Bearing Vibrations and Temperatures
Bowl Motor Winding and Bearing Temperatures
Scroll Motor Bearing Vibrations and Temperatures
Scroll Motor Discrete Alarms
Bowl Motor Discrete Alarms
Control Panel Alarms
Lube System Discrete Alarms
Centrifuge Discrete Alarms
[mcm~[Emm -----~----------------------------------------------l -KE•·'' DEWATERING CENTRIFUGE 3 DETAIL ·_!'[ ,>'ErJ_[ff•l .
ALARM LEGEtJD
ALERT
+ FEED-OFF
x CONTROLLED SHUTDOWN
# IMMEDIATE SHUTDOWN
@ EMERGENCY SHUTDOWN
1-c, ,T~T"_
BO\JIIL VFD AT SPEED :::::::
CENTRIFUGE AT SPEED -------
BOWL MOTOR VFD BREAKER : : : : : : : _
SCROLL MOTOR VFD BREAKER ________ ,
6 'v <l [>
, ,:,1 ITF•,-•L i= ••I IEL ~L-PI I~
POWER SUPP1 24VDC TROUBLE
POWER SUPP2 24VDC TROUBLE
RUHTlM Ht;;LP
3/23/2020 – Rev. 6 22
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Centrifuge Control Station Screens
The centrifuge control stations screens allow operator control of the system. Nine (9)
screens are represented below.
AREAl SYSTEM FEED CONTROL STATION GlD CEll1el.10l·O,
:L', '\J <] (> l1ENU GIWHIC
SYSTEr,1 FEEC
STATUS f I
MODE: LOCAL
[iii ill! -[ii] Iii Iii
COll'IGURE TRENDS RIMTIII!: HELP
3/23/2020 – Rev. 6 23
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
This screen shows START/STOP/AUTO control of the bowl motor. The operations of
these components are described in the component subsections of this memo.
•>LOI BOWL CONTROL STATION ,, ll':<Ul'_,W)II I
NOlE: IN MAINT MODE. TIE START BUTTON RUNS TIE MOTOR
FOR 10 SECOWS, lHEN STOPS FOR 30 SECONDS
C> l1ENU GRAPHIC
BOWL SPEED & SETPOINT
2400 +----t-------t-----+----+-----+---------,
1800 +----t-------t-----+----+-----+---------,
1200 +----t-------t-----+----+-----+---------,
500 +----t-------t-----+----+-----+---------,
0+----f-------t----+-----+-----+-----,
60 50 40 30 20 10
CONFIIIURE TREHDS RUHTil1E HELP
3/23/2020 – Rev. 6 24
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
This screen shows START/STOP/AUTO control of the scroll motor. The operations of
these components are described in the component subsections of this memo.
,!CAI SCROLL CONTROL STATION ,, I[ :<Flll_,,,,,)1 I
NOTE; IN MAINT MOOE, THE START BUTTON RUNS THE MOTOR FOR 10 SECONDS, 1ttEN STOPS FOR JO SECONDS
ltENU GMPHIC COll'IGURE TREll>5 RUNTil1E tELP
3/23/2020 – Rev. 6 25
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
This screen shows START/STOP control of the flush and shutdown mode. The
operations of these components are described in the component subsections of this
memo.
,m, FLUSH AND SHUTDOWN CONTROL STATION,,, Flll_,,,,o,_,,
cotl'l:~ TRDl>S RUNTIPIII!: tELP
3/23/2020 – Rev. 6 26
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
This screen shows START/STOP control of clean in place (CIP) mode. The operations
of these components are described in the component subsections of this memo.
AREH CLEAN IN PLACE CONTROL STATION G_l·D LEll1 M.,o,_,o,
CLEAJ J Ir! PlACf:::
1CIP
STATUS
iillllliil -[ii]-
cotl'l:~ TRDl>S RUNTIPIII!: tELP
3/23/2020 – Rev. 6 27
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
This screen shows OPEN/CLOSE/AUTO control of the flush water solenoid valves The
operations of these components are described in the component subsections of this
memo.
,CLCI FLUSH VALVE CONTROL STATION ,, ll':<Ul'_,WJI_S
~ V <J C> ,_, -,,c cotl"IGURE TRDIDS Rl.lfTil'E HELP
3/23/2020 – Rev. 6 28
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
This screen shows OPEN/CLOSE/AUTO control of the seal water solenoid valve. The
operations of these components are described in the component subsections of this
memo.
«fc<• SEAL WATER CONTROL STATION -'l Ull_,,,llll_'1,
!?J 'v @] [> PENU GRAPHIC
SEt..L '/./t,TER \:t,.l\!E
1~.r,1F'V 1".~
STATUS
MODE AUTO
INTRLOCK: ·1
iiiill!II --~
CONl'l:~ TRDl>S RLlffIPIII!: tELP
3/23/2020 – Rev. 6 29
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Lube System Control Stations
This screen displays the control stations for the liquid side and solid side pumps
associated with the centrifuge lube system. The operations of these components are
described in the component subsections of this memo.
ram~~
,.,[el LUBE PUMP CONTROL STATION l,I[' •Elll,iL,I
[> IEIU llRAPHIC
Ll(jl_ll[i '~i[;[ LLJ[:E r::uuf-'.
1~,/,1Pr.1F1-l-,
STATUS
MODE LOCAL
!NTRLOCK: WAIT
iilliillll
111111
COll'l:GURI!: TRDl>5 RLlfTil'I!: tELP
3/23/2020 – Rev. 6 30
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
This screen displays the control stations for the liquid side and solid side pumps
associated with the centrifuge lube system. The operations of these components are
described in the component subsections of this memo.
,m, LLJBE OIL COOLING VLV CONTROL STATION,,,, ,,c,,,_,,,,,_"'
·::'1[;E 1J1,)L1tJ,"";
-::..-:)LElh)l["I \//,.l\!E
FUF_-\/1..\,
STATUS I
MODE: AUTO
INTRLOCK
iiiiliil
iiliillll
cotrl:DUR!: TRDl>5 RLlfTil'I!: tELP
3/23/2020 – Rev. 6 31
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Trend Screen
This screen displays the trends centrifuge sludge flow, polymer flow, bowl speed and
gear speed, and differential speed.
3/23/2020 – Rev. 6 32
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Runtime Screen
This screen displays the runtimes of the equipment along with status, mode, and alarm
condition. For this system Duty (Lead/Lag conditions are not applicable).
~~~
,m, DEWATERING CENTRIFUGE RUNTIME ,_ll EIIIRTll
PUIITIML 111_!11 Ill.Ir
IA<, fJALff_ DESCrnPTIC1t·J STA!llS 1.1,:ir,c_ [l(Jl'y ALAf<M F'P[Vl<:!US IA,\IIITE:IIAIICE l<!ltlllr,IE ,;ur,HFIH DAY UAY
15MCEN121 C1 BOWL MOTOR OFF NIA OK 00 00 000_0
15MCEN131 C1 SCROLL MOTOR OFF NIA OK o_o o_o 000_0
15MPMP140 C1 SOLID SIDE LUBE PUMP OFF LOCAL NIA OK o_o 0_1 000 0
15MPMP147 C1 LIQUID SIDE LUBE PUMP OH LOCAL NIA OK 0-4 0 0 000_0
121 <] [> IENU IIRAPHIC cotrl:DUR!: TRDl>S
3/23/2020 – Rev. 6 33
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Alarm Screen
Any alarms will appear on this display screen in either the unacknowledged or
acknowledged window. The sample text shows format of the alarm conditions. See
Appendix A for a list of possible alarms.
,mi ALARM SUMMARY '"nll_el,I
<J [:> ltENU
3/23/2020 – Rev. 6 34
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Configuration and Set Point Screens
This screen allows operator setpoint entry and in service and out of service selection of
equipment. The set points with green background are configurable. And those with a
brown background are hardcoded. In service or out of service are displayed by a check
mark.
CENTRIFUGE SET POINTS
D, \7 <) (> MNII IIRAPIU~
123.1
123.1
123.1
EQUIPMENT SERVICE SELECTION
Iii Iii
Iii Iii
Iii Iii
Iii Iii
Iii Iii
Iii Iii
Iii Iii
Iii Iii
IMITDII HlU'
3/23/2020 – Rev. 6 35
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
System Menu
This system menu allows display of PLC status, and Manufacturer’s information.
Cl,-IITI SYSTEM MENU IH.IEIJIS, I
'v<J[> IENU
3/23/2020 – Rev. 6 36
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
PLC Status Screen
Fi,dlT I PLC ST A TUS H <YI!_,, I
3/23/2020 – Rev. 6 37
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Manufacturer’s Information
Fi,dlT I GEA MECHANICAL EQLJIP INFO I· rn,,,
[> IENU
GEA Mechanical Equipment US, Inc.
Sales Order No.: 165280158
Dewatering Centrifuge Model No.: CA 1035-00-33
Dewatering Centrifuge Serial Nos.: 8008-658, 8008-659, 8008-660
Address: 100 Fai,way Court
Northvale, NJ 07647
Main Phone: 201-767-3900
Toll Free (24/7): 1-800-509-9299
Web Link: www.gea.com <http://www.gea.com>
3/23/2020 – Rev. 6 38
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Help Screen
Fi,dlTI HELP SCREEN _IHEIF
SCREEN NAVIGATION METHODS
THERE ARE TWO WAYS OF MOVING WITHIN THE GRAPHICS:
USING THE BOTTOM BAR AAROW BUTTONS
USING THE BOTTOM BAR CUSTOM BUTTONS
USING THE BOTTOM BAR
THE UP AND DOWN (
ONS
) BUTTONS TRAVERSE THE VERTICAL
LEVELS OF THE MENU FOR A GIVEN PROCESS. THESE BUTTONS
AUTOMATICALLY SELECT THE NEXT EXISTING SCREEN ABOVE (UP
BUTTON) OR BELOW (DOWN BUTTON) THE SCREEN CURRENTLY
DISPLAYED WHEN THE PROCESS IS NOT ASSOCIATED WITH SCREENS
AT ALL THE DIFFERENT LEVELS
THE LEFT AND RIGHT ( BUTTONS TRAVEL WITHIN A GIVEN
VERTICAL LEVEL. THESE BUTTONS DISPIA Y THE SAME SCREEN TYPE
UPSTREAM (LEFT BUTTON) OR DOWNSTREAM (RIGHT BUTTON) OF THE
GRAPHIC SHOWN ON THE SCREEN WHEN THE BUTTONS ARE DOUBLE
CLICKED
USING THE BOTTOM BAR CUSTOM BUTTONS
THESE BUTTONS PROVIDE WITH QUICK ACCESS TO SCREENS
ASSOCIATED WITH THE SCREEN CURRENTLY DISPLA YEO THE
ASSOCIATED SCREENS ARE LOCATED IN DIFFERENT LEVELS. IF THERE
ARE MULTIPLE SCREENS WITHIN A LEVEL ASSOCIATED WITH THE
SCREEN CURRENTLY DISPLAYED. THE CUSTOME BUTTON WIU DISPLAY
THE FIRST OF THE MULTIPLE SCREENS.
MENU LEVELS
THERE ARE TEN VERTICAL SCREEN LEVELS OR SCREEN TYPES THEY ARE:
LEVEL 1 -PLANT OVERVIEW (GRAPHICAL MENU)
LEVEL 2 -PLANT AREAS OVERVIEW
LEVEL 3 -PROCESS OVERVIEW SCREEN (WHERE APPLICABLE)
LEVEL 4 -PROCESS GRAPHIC SCREEN
LEVEL 5 -PROCESS DETAIL SCREEN (WHERE APPUCAlllE)
LEVEL 6 -PROCESS CONFIGURATION SCREEN (WHERE APPLICABLE)
LEVEL 7 -PROCESS TREND SCREEN (WHERE APPLICABLE)
LEVEL 8 -PROCESS SUMMARY SCREEN (WHERE APPLICABLE)
LEVEL 9 -PROCESS SEQUENCE SCREEN (WHERE APPLICABlE)
LEVEL 10 -RUN TIME SCREEN (WHERE APPLICABLE)
3/23/2020 – Rev. 6 39
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
APPENDIX A – ALARM CONDITIONS AND SHUTDOWNS
Alarm condition Alert Feed
Off
Controlled
Shutdown
Immediate
Shutdown
Emergency
Shutdown
Liquids Side Bearing Temp – HI
Liquids Side Bearing Temp – HIHI
Liquids Side Fixed Bearing Temp – HI
Liquids Side Fixed Bearing Temp – HIHI
Solids Side Bearing Temp – HI
Solids Side Bearing Temp – HIHI
Bowl Motor Shaft End Bearing Temp – HI
Bowl Motor Shaft End Bearing Temp – HIHI
Bowl Motor Fan End Bearing Temp – HI
Bowl Motor Fan End Bearing Temp – HIHI
Scroll Motor Shaft End Bearing Temp – HI
Scroll Motor Shaft End Bearing Temp HIHI
Scroll Motor Fan End Bearing Temp – HI
Scroll Motor Fan End Bearing Temp – HIHI
Bowl Motor Winding Temp – HI (6 x RTD’s)
Bowl Motor Winding Temp – HIHI (6 x RTD’s)
Scroll Motor Winding Temp HI
Bowl Speed HiHi
Bowl Speed Hi
Bowl Speed Low
Differential Speed Low
Centrifuge CCP Emergency Stop
Centrifuge Station (near stairs) Emergency
Stop
Centrifuge Bowl CMCC Emergency Stop
Centrifuge Scroll CMCC Emergency Stop
Bowl Motor VFD Fault
Bowl Motor VFD Fail to Run
Scroll Motor VFD Fault
Scroll Motor VFD Fail to Run
Torque HI
Torque HIHI
Liquids Side Horizontal Vibration HI
Liquids Side Horizontal Vibration HIHI
Liquids Side Vertical Vibration HI
Liquids Side Vertical Vibration HIHI
Solids Side Horizontal Vibration HI
Solids Side Horizontal Vibration HIHI
Solids Side Vertical Vibration HI
Solids Side Vertical Vibration HIHI
Scroll Motor Vibration HI
Scroll Motor Vibration HIHI
Liquids Side Lube Oil Pressure Low
)
/
· ..
····· ... /
' ' " / --" / /
/ " .. ····/ --
\
······ .... \ '/ / ' ) ' \ .... .. / ...._ ...
\ ···· ... ·· ..
' ······ .... ······ ....
/-... ,._ ' ' \__ 0-,.. -, •. , __ ...._
\ ' '~ '·
\, . .,
<'',.,_ "'~<~ ~
\ ~ ··,.,._ ' ~
\ \ ~ ·-,.,., ....
✓--" \ \ ) ---, .....
I /--\\ / /'....
\ \ /
\ '· ...... __ ------._ \ \
' -----•···· .. , \ \
\ \ \)
J I
_/ /
'-..__ ___ /
3/23/2020 – Rev. 6 40
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
Liquids Side A Lube Oil Flow Low
Alarm condition Alert Feed
Off
Controlled
Shutdown
Immediate
Shutdown
Emergency
Shutdown
Liquids Side B Lube Oil Flow Low
Liquids Side Lube Oil Cooling Flow Low
Liquids Side Lube Oil Level Low
Liquids Side Lube Oil Diff. Press High
Liquids Side Lube Oil Water Sensor Fault
Liquids Side Lube Oil Pump Motor Overload
Liquids Side Lube Oil Pump Motor Fail to Run
Solids Side Lube Oil Pressure Low
Solids Side A Lube Oil Flow Low
Solids Side B Lube Oil Flow Low
Solids Side Lube Oil Cooling Flow Low
Solids Side Lube Oil Level Low
Solids Side Lube Oil Diff. Press High
Solids Side Lube Oil Water Sensor Fault
Solids Side Lube Oil Pump Motor Overload
Solids Side Lube Oil Pump Motor Fail to Run
Plant System Fail to Feed
System Feed Control Station is Off
Flush Water Low Flow
Seal Water Low Flow
PNL FCP120 PS1 24VDC Trouble Alarm
PNL FCP120 PS2 24VDC Trouble Alarm
'"··.
/
······ .... /
.......
" "' /
' "' /
/ "' / ..... · ....
.. ···'--\ _ ......
····· ... \ '\. '·· ...
I '\./ / I ' ( "' / "'-/
\
······ ... ······ ...
,,--.. "' · .. '····· ...
( · ....... ,, '\., '--"'~ ........ ,. \,
~>
"\._,./
3/23/2020 – Rev. 6 41
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
APPENDIX B – ANALOG SCALING
Scaling methods: All analog values will be scaled from the raw data to their respective Engineering units.
ANALOG INPUTS
DESCRIPTION INPUT TYPE RANGE (Eng. Units) ALARM SET POINTS
Bowl Motor Amps (Note 1) 4-20 mA 0 ~ 931.5 Amps N/A
Bowl Motor Volts (Note 1) 4-20 mA 0 ~ 480 Volts N/A
Bowl Motor Frequency (Note 1) 4-20 mA 0 ~ 60 Hz N/A
Scroll Motor Amps (Note 1) 4-20 mA 0 ~ 131.8 Amps N/A
Scroll Motor Volts (Note 1) 4-20 mA 0 ~ 480 Volts N/A
Scroll Motor Torque (Note 1) 4-20 mA 0 ~ 150% 80% = HI
90% = HHI
Scroll Motor Frequency (Note
1) 4-20 mA 0 ~ 60 Hz N/A
Centrifuge Bearing
Temperatures RTD, PT 100 0 ~ 1562°F 212°F = HI
230°F = HHI
Motor Bearing Temperatures RTD, PT 100 0 ~ 1562°F 225°F = HI
235°F = HHI
Bowl Motor Winding
Temperatures RTD, PT 100 0 ~ 1562°F 293°F = HI
311°F = HHI
Bowl Speed 4-20 mA 0 ~ 3000 RPM 2200 RPM
Cyclo Gear Input Speed 4-20 mA 0 ~ 3000 RPM N/A
Centrifuge Vibration 4-20 mA 0 ~ 2.0 in/s (RMS) 0.8 in/s = HI
1.0 in/s = HIHI
Sludge Flow Rate 4-20 mA 0 ~ 2000 GPM N/A
Polymer Flow Rate 4-20 mA 0 ~ 50 GPM N/A
Notes:
1. These signals are also monitored by SCADA via the Ethernet network.
ANALOG OUTPUTS
DESCRIPTION OUTPUT TYPE RANGE (Engineering Units)
Bowl Motor VFD Speed Adjust 4-20 mA 0 ~ 100%
Scroll Motor VFD Speed Adjust 4-20 mA 0 ~ 100%
4 •
/
( /
~ \
" ("-._
~~ :/>
/ ~.;' "\ ~ ~ ~//
,-~·· ······ .... ) \ ~~, ///) ,< "'···· ... /// "'-... /
\\~ ····· ... ~····· ............
( ··,., .. ,._ \ ······....... "'-) ""~·-, .. , .. , \ ~ )
~~~ -<'',.,_
\"0 -:_·,·,.,., ""~
/--" \\ ~ ',.,.,., "'"'
~~ ~~)
3/23/2020 – Rev. 6 42
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
APPENDIX C – TIMERS / COUNTERS AND SETPOINTS
SCROLL CONTROL OPERATING SETPOINTS
These parameters are commonly modified to fine tune the process and are not password
protected
Control Begin
Control Begin is the torque setpoint (%) at which the SJM control starts to operate.
Above the Control Begin threshold, a rising torque results in a differential speed
increase and a reduced torque in a differential speed decrease.
Basic Differential Speed
The basic differential speed is the differential speed at which the decanter works
below the Control begin threshold.
Control Gradient
Slope of characteristic curve after exceeding the Control Begin threshold. The greater
the control gradation value, the greater the differential speed change per torque unit
and the more the control systems tends to override. The differential speed starts
oscillating.
Delay Time
The delay time adjusts the reaction time of the decanter. A long delay time results in
a slow decanter reaction. A short delay time results in a fast decanter reaction.
PROCESS PARAMETERS
These are parameters that users change depending on the type of sludge being processed. Some
parameters in this group are password protected or secured.
Flush Water Off Bowl Speed (secured)
This is the bowl speed value at which the flush water will turn off during shutdown.
Flush Water On Bowl Speed (secured)
This is the bowl speed value at which the flush water will turn on during start-up.
CIP Cycles
This is the number of cycles required to clean the centrifuge.
CIP Low Bowl Speed (secured)
During the CIP sequence, this is the bowl speed at which the wall of liquid inside of
the bowl will collapse.
CIP High Bowl Speed (secured)
During the CIP sequence, this is the bowl speed at which the bowl will accelerate to
for a period of time, with flush water turned on, before costing down to the CIP Low
Bowl speed.
3/23/2020 – Rev. 6 43
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
PROCESS TIMERS
These timers control the starting and stopping of the equipment and will not usually need
modification once commissioning is complete. Most of these parameters are either hard-
coded or password protected.
Torque / Open Diverter Gate
This is the torque value at which the diverter gate will open. When the machine
torque is greater than this set point for a preset time period, the diverter gate will
open.
Torque / Open Diverter Gate delay
This is the time the torque must be above the set point before the diverter gate will
open.
Torque / Close Diverter Gate
This is the torque value at which the diverter gate will close. When the machine
torque is less than this set point for a preset time period, the diverter gate will close.
Torque / Close Diverter Gate delay
This is the time the torque must be above the set point before the diverter gate will
close
Bowl Motor Start-Up Timer
This is the time that the main bowl motor is given to ramp up to operating speed. If
the bowl speed is within the operating limits when this timer expires, then the
centrifuge is ready to process sludge. If the bowl speed is above or below operating
limits when this timer expires, then an alarm is issued and the controlled shutdown
sequence is initiated
Flush Water – Start-up
This is the time that the flush water cycle is active during start-up
Flush Water – Torque High
This is the time that the flush water cycle is active, when triggered by a Torque High Alarm.
Flush Water – Vibration High
This is the time that the flush water cycle is active, when triggered by a Vibration
High Alarm.
Idle Mode - Flush Interval
This is the time that centrifuge will remain in idle mode before the flush water valve
will open
Idle Mode - Flush Duration
This is the time duration that valve will open during an idle mode flush
Pre-Lube Timer
This is the time duration that the lube oil system is required to run prior to starting the
centrifuge.
Post-Lube Timer
This is the time duration that the lube oil system is required to run after the centrifuge
has shut down.
3/23/2020 – Rev. 6 44
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
MACHINE CONFIGURATION PARAMETERS
These parameters are set during commissioning and should not be modified except by
qualified personnel. These parameters are password protected.
Primary Gear Factor
This is the gearbox ratio for the primary gear.
Secondary Gear Factor
This is the gearbox ratio for the secondary gear.
Minimum Differential Speed
This is the minimum differential speed for centrifuge operation. If the differential speed is
below this setpoint, then a differential speed low alarm is issued.
Maximum Differential Speed
This is the maximum differential speed for centrifuge operation.
Torque Suppression Value
This is a bias value for the torque that is determined by operating the centrifuge with no load
at the highest differential speed. This value is used to determine the true zero point of the
torque with no load on the machine.
Bowl Minimum Operating Speed
This is the minimum bowl speed at which the centrifuge is designed to operate.
Bowl Maximum Operating Speed
This is the maximum bowl speed at which the centrifuge is designed to operate.
Bowl at Speed (Ready for Feed)
This is the operating bowl speed for processing.
Restart Interlock
During a shutdown cycle, the centrifuge can be restarted when the bowl speed drops below
this setpoint.
Torque High
This is the setpoint of the torque high alarm.
Torque High-High
This is the setpoint of the torque high-high alarm.
Vibration High
This is the setpoint of the vibration high alarm.
Vibration High-High
This is the setpoint of the vibration high-high alarm.
Bearing Temperature High
This is the setpoint of the bearing temperature high alarms.
Bearing Temperature High-High
This is the setpoint of the bearing temperature high-high alarms.
3/23/2020 – Rev. 6 45
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
APPENDIX D – PRESETS AND SECURITY SETUP
Description Preset Units Range
Scroll Operation
Control Begin 30 % 0-100
Basic Differential Speed 5 Rpm 1.0-9.8
Gradient 13 % 0-100
Delay Time 5 seconds 0-100
Process Parameters
Torque/diverter gate close 15 % 0 – 100
Torque/diverter gate open 25 % 0 – 100
Flush Water Off Bowl Speed 200 Rpm 0-500
Flush Water On Start-up Bowl Speed 500 Rpm 0-1850
Flush Water Off Torque (Flush & Shutdown) 15 % 0-100
CIP Cycles 3 - 0-99
CIP Bowl Speed High 500 Rpm 0-1850
CIP Bowl Speed Low 100 Rpm 0-1850
4 •
'"··.
/
.
····· ... /
, " "' ' /
/
/ ... ,---.........,_ _ .. /
I,_ • ' " ····· ... "/ / ····· ... " ····· ... " \ ' ····· ... " · .. '-··
\ \" ····· ... " \ \' ······ ...
.,--~ \ \ " . ( ·· ........ \ \ " ····· ... "~ ~ ........ \ \ " " "' ~ ....... ,. \ \ ' ~-' "' ~ ··-.. \ \
( · ...... ,, " ' ~ \ \ ·~ ··,.,. " "' ~/
\ \ '"'-'·,., " "' 0
-...... \ \ "-.... ...... , .. " " .---\ \ / .,,....__ ·-., ..
\ \/ / ~ .. )
\ / ..... __ ---., \ \ ..........__ --........ · .. \ \ \
\ \ \..,/
) } ,--_ _.,/
3/23/2020 – Rev. 6 46
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
3/23/2020 – Rev. 6 47
SAMPLE ONLY – DO NOT USE FOR PROGRAMMING
APPENDIX E – CENTRIFUGE FORMULAS AND CALCULATIONS
Enter calculations required
4 •
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
1
2 02001 55FU079_CLK ROCKY PLC CLCK WIDE CLK UPDATE
3 04001 55FU079_BAT PLC BATTERY FAILED
4 04002 55FU079_MEM PLC MEMORY PROTECT OFF
5 04003 55FU079_MOD PLC ALL MODS NOT HEALTHY
6 04004 55FU079_COM PLC DROPS NOT COMMUNICATING
7 04011 55FU079_PRO PLC HOT STNDBY PROBLEM (HOT)
8 04012 55FU079_B PLC CNTRLLER B PRIMARY (HOT)
9 04013 55FU079_MIS PLC CNTR LOGIC MISMATCH (HOT)
10 44001 55FU079_SCN ROCKY PLC PROG SCAN TIME 0-999.9 MSEC
11 44002 55FU079_DOW ROCKY PLC CLCK DAY OF WEEK 0-7 DOW
12 44003 55FU079_MON ROCKY PLC CLCK MONTH 0-12 MONTH
13 44004 55FU079_DAY ROCKY PLC CLCK DAY 0-31 DAY
14 44005 55FU079_YR ROCKY PLC CLCK YEAR 0-99 YEAR
15 44006 55FU079_HR ROCKY PLC CLCK HOUR 0-24 HOUR
16 44007 55FU079_MIN ROCKY PLC CLCK MINUTE 0-60 MINUTE
17 44008 55FU079_SEC ROCKY PLC CLCK SECOND 0-60 SECOND
18
19 10018 55FLSH040 WW FLOAT HI LEVEL D03-R01-S03-P02
20 00042 55FLAH040 WW FLOAT HI LEVEL ALM D02-R01-S06-P10
21 04022 55FLSH040_ALA WW FLOAT HI LEVEL ALARM
22 02021 55FLSH040_ALH WW FLOAT ALARM ACK HMI
23 04023 55FLSH040_ALK WW FLOAT ALARM ACK
24
25 30022 55FLIT038 WW SONIC 2 LEVEL 0-300 INCHES D06-R01-S07-P04
26 44023 55FLIT038_LVL WW SONIC 2 LEVEL 0-300 INCHES
27
28 02032 55FLF038_ISH WW SONIC 2 INS HMI
29 04041 55FLF038_ISM WW SONIC 2 INS MODE
30 02031 55FLF038_OSH WW SONIC 2 OOS HMI
31 04040 55FLF038_OSM WW SONIC 2 OOS MODE
32
33 10161 55FYS038B WW SONIC 2 XMTR TRBL D05-R01-S05-P01
34 04036 55FYS038B_ALA WW SONIC 2 XMTR TRBL ALM
35 02028 55FYS038B_ALH WW SONIC 2 ALARM ACK HMI
36 04037 55FYS038B_ALK WW SONIC 2 ALARM ACK
37 00051 55FYA038B WW SONIC 2 XMTR TRBL ALM D02-R01-S07-P03
38
39 02034 55FLE038J_S2H WW SONIC 2 HMI SELECT
40 10003 55FHS038J WW SONIC 2 SELECT D02-R01-S03-P03
41 04043 55FLE038J_S2M WW SONIC 2 SELECTED
42 00002 55FYL038J WW SONIC 2 SELECTED D02-R01-S04-P02
43
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
17410 Attachment - Sample Test Sheet Page 1 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
,_ --,_
,_
C C
[]
[]
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
44 30002 55FLIT035 WW SONIC 1 LEVEL 0-300 INCHES D04-R01-S05-P02
45 44022 55FLIT035_LVL WW SONIC 1 LEVEL 0-300 INCHES
46
47 02030 55FLF035_ISH WW SONIC 1 INS HMI
48 04039 55FLF035_ISM WW SONIC 1 INS MODE
49 02029 55FLF035_OSH WW SONIC 1 OOS HMI
50 04038 55FLF035_OSM WW SONIC 1 OOS MODE
51
52 10019 55FLSL035 WW SONIC 1 LO LEVEL D03-R01-S03-P03
53 04032 55FLSL035_ALA WW SONIC 1 LO LEVEL ALARM
54 02026 55FLSL035_ALH WW SONIC 1 ALARM ACK HMI
55 04033 55FLSL035_ALK WW SONIC 1 ALARM ACK
56 00043 55FLAL035 WW SONIC 1 LO LEVEL ALM D02-R01-S06-P11
57
58 10065 55FLSMA035 WW SONIC 1 P1 START D03-R01-S06-P01
59 04024 55FLSMA035_ALA WW SONIC 1 P1 START ALARM
60 02022 55FLSMA035_ALH WW SONIC 1 P1 ALARM ACK HMI
61 04025 55FLSMA035_ALK WW SONIC 1 P1 ALARM ACK
62 10066 55FLSMB035 WW SONIC 1 P2 START D03-R01-S06-P02
63 04026 55FLSMB035_ALA WW SONIC 1 P2 START ALARM
64 02023 55FLSMB035_ALH WW SONIC 1 P2 ALARM ACK HMI
65 04027 55FLSMB035_ALK WW SONIC 1 P2 ALARM ACK
66 10081 55FLSMC035 WW SONIC 1 P3 START D03-R01-S07-P01
67 04028 55FLSMC035_ALA WW SONIC 1 P3 START ALARM
68 02024 55FLSMC035_ALH WW SONIC 1 P3 ALARM ACK HMI
69 04029 55FLSMC035_ALK WW SONIC 1 P3 ALARM ACK
70 10082 55FLSMD035 WW SONIC 1 P4 START D03-R01-S07-P02
71 04030 55FLSMD035_ALA WW SONIC 1 P4 START ALARM
72 02025 55FLSMD035_ALH WW SONIC 1 P4 ALARM ACK HMI
73 04031 55FLSMD035_ALK WW SONIC 1 P4 ALARM ACK
74
75 10017 55FYS035B WW SONIC 1 XMTR TRBL D03-R01-S03-P01
76 04034 55FYS035B_ALA WW SONIC 1 XMTR TRBL ALM
77 02027 55FYS035B_ALH WW SONIC 1 ALARM ACK HMI
78 04035 55FYS035B_ALK WW SONIC 1 ALARM ACK
79 00050 55FYA035B WW SONIC 1 XMTR TRBL ALM D02-R01-S07-P02
80
81 02033 55FLE035J_S1H WW SONIC 1 HMI SELECT
82 10002 55FHS035J WW SONIC 1 SELECT D02-R01-S03-P02
83 04042 55FLE035J_S1M WW SONIC 1 SELECTED
84 00001 55FYL035J WW SONIC 1 SELECTED D02-R01-S04-P01
85
17410 Attachment - Sample Test Sheet Page 2 of 35 9/22/2020 1:05 PM
DR
A
F
T
,_ --,_
,_
C
C
C
C
C
C C
[]
[]
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
86 44024 55FLIT035_ACT WW ACT LEVEL 0-300 INCHES
87 40001 55FLI034 WW ACT LCP LEVEL 0-300 INCHES D02-R01-S10-P01
88 40013 55FLI034D WW ACT LCPA LEVEL 0-300 INCHES D04-R01-S09-P01
89 40007 55FLI034B WW ACT ELEC RM LEVEL 0-300 INCHES D04-R01-S07-P03
90 40010 55FLI034A WW ACT DRYWELL LEVEL 0-300 INCHES D04-R01-S08-P02
91
92 42024 55FLT035_LLS WW ACT LOLO LVL SET 0-300 INCHES
93 44028 55FLT035_LLP WW ACT LOLO LVL SP 0-300 INCHES
94 04052 55FLT035_LLA WW ACT LOLO LVL ALM
95 02039 55FLT035_LLH WW ACT LOLO LVL ACKHMI
96 04053 55FLT035_LLK WW ACT LOLO LVL ALMACK
97 00040 55FLALL034 WW ACT LOLO LEVEL ALM D02-R01-S06-P08
98
99 42023 55FLT035_LS WW ACT LO LVL SET 0-300 INCHES
100 44027 55FLT035_LP WW ACT LO LVL SP 0-300 INCHES
101 04050 55FLT035_LA WW ACT LO LVL ALM
102 02038 55FLT035_LH WW ACT LO LVL ACKHMI
103 04051 55FLT035_LK WW ACT LO LVL ALMACK
104 00039 55FLAL034 WW ACT LO LEVEL ALM D02-R01-S06-P07
105
106 42022 55FLT035_HS WW ACT HI LVL SET 0-300 INCHES
107 44026 55FLT035_HP WW ACT HI LVL SP 0-300 INCHES
108 04048 55FLT035_HA WW ACT HI LVL ALM
109 02037 55FLT035_HH WW ACT HI LVL ACKHMI
110 04049 55FLT035_HK WW ACT HI LVL ALMACK
111 00038 55FLAH034 WW ACT HI LEVEL ALM D02-R01-S06-P06
112
113 42021 55FLT035_HHS WW ACT HIHI LVL SET 0-300 INCHES
114 44025 55FLT035_HHP WW ACT HIHI LVL SP 0-300 INCHES
115 04046 55FLT035_HHA WW ACT HIHI LVL ALM
116 02036 55FLT035_HHH WW ACT HIHI LVL ACKHMI
117 04047 55FLT035_HHK WW ACT HIHI LVL ALMACK
118 00037 55FLAHH034 WW ACT HIHI LEVEL ALM D02-R01-S06-P05
119
120 04054 55FLT035_COA WW ACT COMMON ALARM
121 04055 55FLT035_COK WW ACT COMMON ALM ACK
122
123 10004 55FHS034J WW ACT LCP LVL SETPT UP D02-R01-S03-P04
124 10005 55FHS034K WW ACT LCP LVL SETPT DOWN D02-R01-S03-P05
125 40002 55FLI034C WW ACT LCP LEVEL SETPT 0-300 INCHES D02-R01-S10-P02
126
127 04045 55FLDSH035_ACK WW ACT ALARM ACK
128 02035 55FLDSH035_ALH WW ACT ALARM ACK HMI
129 04044 55FLDSH035_ALM WW ACT DEVIATION ALARM
130
17410 Attachment - Sample Test Sheet Page 3 of 35 9/22/2020 1:05 PM
DR
A
F
T
C C
C C
C C
C C
9= 9=
---C C -
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
131 02072 55FPMP100_OSH PUMP 1 OOS HMI
132 04110 55FPMP100_OSM PUMP 1 OOS MODE
133 02073 55FPMP100_ISH PUMP 1 INS HMI
134 04111 55FPMP100_ISM PUMP 1 INS MODE
135
136 02069 55FPMP100_ONH PUMP 1 ON HMI
137 04107 55FPMP100_ONM PUMP 1 ON MODE
138 02070 55FPMP100_OFH PUMP 1 OFF HMI
139 04108 55FPMP100_OFM PUMP 1 OFF MODE
140 02071 55FPMP100_AUH PUMP 1 AUTO HMI
141 04109 55FPMP100_AUM PUMP 1 AUTO MODE
142
143 10034 55FHS100B PUMP 1 REMOTE D03-R01-S04-P02
144 10035 55FHS100J PUMP 1 HAND D03-R01-S04-P03
145 04113 55FPMP100_HND PUMP 1 HAND
146
147 04105 55FPMP100_DIS PUMP 1 DISABLE MODE
148 04106 55FPMP100_WAT PUMP 1 WAIT
149
150 04112 55FPMP100_ON PUMP 1 ON
151 00007 55FYL100L PUMP 1 ON D02-R01-S04-P07
152 00086 55FYL100P PUMP 1 LCPA ON D03-R01-S10-P06
153
154 44058 55FPMP100_MOD PUMP 1 MODE DISPLAY 0-4095 MODE
155 44057 55FPMP100_SYM PUMP 1 SYMBOL DISPLAY 0-4095 SYMBOL
156 44048 55FPB100_DUT PUMP 1 DUTY DISPLAY 0-4095 DUTY
157
158 04117 55FPMP100_FAA PUMP 1 FAIL ALARM
159 02075 55FPMP100_FAH PUMP 1 FAIL ACK HMI
160 04118 55FPMP100_FAK PUMP 1 FAIL ALM ACK
161
162 10033 55FYS100M PUMP 1 PROTECT ON D03-R01-S04-P01
163 04056 55FYS100M_ALA PUMP 1 PROTECT ON ALM
164 02040 55FYS100M_ALH PUMP 1 ALARM ACK HMI
165 04057 55FYS100M_ALK PUMP 1 ALARM ACK
166
167 04119 55FPMP100_COA PUMP 1 COMMON ALARM
168 04120 55FPMP100_COK PUMP 1 COMMON ALM ACK
169 00019 55FYA100B PUMP 1 TROUBLE ALM D02-R01-S05-P03
170
171 02074 55FPMP100_ALR PUMP 1 ALARM RESET HMI
172 00099 55FPMP100H PUMP 1 PLC RESET D04-R01-S03-P03
173
174 44061 55FPMP100_RTC PUMP 1 RUNTME CURR DAY 0-999.9 HOURS
175 44062 55FPMP100_RTP PUMP 1 RUNTME PREV DAY 0-999.9 HOURS
176 44059 55FPMP100_RTM PUMP 1 RUNTME CUMM MSD 0-9999 HRS x100
177 44060 55FPMP100_RTL PUMP 1 RUNTME CUMM LSD 0-999.9 HOURS
178 02076 55FPMP100_RTR PUMP 1 RUNTIME RESET
179
17410 Attachment - Sample Test Sheet Page 4 of 35 9/22/2020 1:05 PM
DR
A
F
T
,-
[] ,--~ ~ ~ I~ ,_
,--
,_
--,_ -
,_ -
,_ -
,_ -
,_ -
--
~
~ ~ ~
[] :J :J :J l:J
B :J -:J l:J ,_
~ ,_ ~ I~ -
C C C C
C C C C
9:: 9:: 9:: 9:: n
:J :J
,_
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
180 10038 55FYS100A PUMP 1 VS READY D03-R01-S04-P06
181 04115 55FYS100A_RDY PUMP 1 VS READY
182 10037 55FYS100 PUMP 1 VS ON D03-R01-S04-P05
183
184 30001 55FST100 PUMP 1 VS SPEED 0-100 PERCENT D04-R01-S05-P01
185 44056 55FPMP100_SPD PUMP 1 VS SPEED 0-100 PERCENT
186 44093 55FST100_RPM PUMP 1 SPEED 0-1188 RPM
187
188 40005 55FSC100 PUMP 1 VS SPEED 0-100 PERCENT D04-R01-S07-P01
189
190 10036 55FHS100K PUMP 1 VS SELECT D03-R01-S04-P04
191 04114 55FPMP100_VSS PUMP 1 VS SELECTED
192
193 42042 55FPMP100_SRS PUMP 1 VS SPEED RAMP SET 0.1-100 RAMP
194 44055 55FPMP100_SRP PUMP 1 VS SPEED RAMP SP 0.1-100 RAMP
195
196 00097 55FPMP100 PUMP 1 VS RUN D04-R01-S03-P01
197
198 02067 55FPA100_AAH PUMP 1 A/M AUTO HMI
199 04103 55FPA100_AAM PUMP 1 A/M AUTO MODE
200 02068 55FPA100_AMH PUMP 1 A/M MANUAL HMI
201 04104 55FPA100_AMM PUMP 1 A/M MANUAL MODE
202
203 42041 55FPA100_AMS PUMP 1 A/M MAN SPD SET 0-100 PERCENT
204 44053 55FPA100_AMP PUMP 1 A/M SPEED SP 0-100 PERCENT
205 44054 55FPA100_AMB PUMP 1 A/M SPEED BAR 0-100 PERCENT
206
207 10039 55FYS100B PUMP 1 VS TROUBLE D03-R01-S04-P07
208 04062 55FYS100B_ALA PUMP 1 VS TROUBLE ALARM
209 02043 55FYS100B_ALH PUMP 1 VS ALARM ACK HMI
210 04063 55FYS100B_ALK PUMP 1 VS ALARM ACK
211
212 10040 55FHS100H PUMP 1 VS RESET D03-R01-S04-P08
213
214 10104 55FHS100L PUMP 1 VS LCPA START D03-R01-S08-P08
215 10105 55FHS100M PUMP 1 VS LCPA STOP D03-R01-S08-P09
216
17410 Attachment - Sample Test Sheet Page 5 of 35 9/22/2020 1:05 PM
DR
A
F
T
~
:J :J :J
--
,_ -
,_ -
,_ -
--
C C C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
217 44194 55FIIT100A_AMP PUMP 1 VFD AMPS PHASE A
218 44195 55FIIT100B_AMP PUMP 1 VFD AMPS PHASE B
219 44196 55FIIT100C_AMP PUMP 1 VFD AMPS PHASE C
220
221 04342 55FISH100L_ALA PUMP 1 VFD OVERLD TRIP ALM
222 02190 55FISH100L_ALH PUMP 1 VFD ALARM ACK HMI
223 04343 55FISH100L_ALK PUMP 1 VFD ALARM ACK
224
225 04344 55FTSH100J_ALA PUMP 1 VFD INV OVRHEAT ALM
226 02191 55FTSH100J_ALH PUMP 1 VFD ALARM ACK HMI
227 04345 55FTSH100J_ALK PUMP 1 VFD ALARM ACK
228
229 04346 55FESL100J_ALA PUMP 1 VFD LO DC VOLT ALM
230 02192 55FESL100J_ALH PUMP 1 VFD ALARM ACK HMI
231 04347 55FESL100J_ALK PUMP 1 VFD ALARM ACK
232
233 04348 55FYS100Q_ALA PUMP 1 VFD HARDWAR FLT ALM
234 02193 55FYS100Q_ALH PUMP 1 VFD ALARM ACK HMI
235 04349 55FYS100Q_ALK PUMP 1 VFD ALARM ACK
236
237 04350 55FESH100J_ALA PUMP 1 VFD HI DC VOLT ALM
238 02194 55FESH100J_ALH PUMP 1 VFD ALARM ACK HMI
239 04351 55FESH100J_ALK PUMP 1 VFD ALARM ACK
240
241 04383 55FPMP100_ALM PUMP 1 VFD COMM FAIL ALARM
242
243 10042 55FYS100L PUMP 1 CS READY D03-R01-S04-P10
244 04116 55FYS100L_RDY PUMP 1 CS READY
245 00098 55FPMP100B PUMP 1 CS RUN D04-R01-S03-P02
246 10041 55FYS100J PUMP 1 CS ON D03-R01-S04-P09
247
248 10043 55FISH100 PUMP 1 CS OVERLOAD D03-R01-S04-P11
249 04064 55FISH100_ALA PUMP 1 CS OVERLOAD ALARM
250 02044 55FISH100_ALH PUMP 1 CS ALARM ACK HMI
251 04065 55FISH100_ALK PUMP 1 CS ALARM ACK
252
17410 Attachment - Sample Test Sheet Page 6 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
C
C
C
C
:::J
:::J
C C C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
253 10044 55FMSH104 PUMP 1 MTR HI MOISTURE D03-R01-S04-P12
254 04060 55FMSH104_ALA PUMP 1 MTR HI MOISTURE ALM
255 02042 55FMSH104_ALH PUMP 1 MTR ALARM ACK HMI
256 04061 55FMSH104_ALK PUMP 1 MTR ALARM ACK
257 00017 55FMAH104 PUMP 1 MTR HI MOISTURE ALM D02-R01-S05-P01
258
259 10045 55FTSH103 PUMP 1 MTR HI WIND TMP D03-R01-S04-P13
260 04058 55FTSH103_ALA PUMP 1 MTR HI WIND TMP ALM
261 02041 55FTSH103_ALH PUMP 1 MTR ALARM ACK HMI
262 04059 55FTSH103_ALK PUMP 1 MTR ALARM ACK
263 00018 55FTAH103 PUMP 1 MTR HI WIND TMP ALM D02-R01-S05-P02
264
265 10046 55FZSC105 PUMP 1 CHK VLV CLOSED D03-R01-S04-P14
266 44097 55FZSC105_STA PUMP 1 CHK VLV STATUS DISPLAY 0-4095 STATUS
267 00011 55FZLO105 PUMP 1 CHK VLV OPENED D02-R01-S04-P11
268 00090 55FZLO105A PUMP 1 CV LCPA OPENED D03-R01-S10-P10
269
270 04175 55FZSC105_ALA PUMP 1 CHK VLV CLOSED ALARM
271 02107 55FZSC105_ALH PUMP 1 CHK VLV ALARM ACK HMI
272 04176 55FZSC105_ALK PUMP 1 CHK VLV ALARM ACK
273
17410 Attachment - Sample Test Sheet Page 7 of 35 9/22/2020 1:05 PM
DR
A
F
T
C C C C
C C C C
[] :J
C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
274 02082 55FPMP200_OSH PUMP 2 OOS HMI
275 04128 55FPMP200_OSM PUMP 2 OOS MODE
276 02083 55FPMP200_ISH PUMP 2 INS HMI
277 04129 55FPMP200_ISM PUMP 2 INS MODE
278
279 02079 55FPMP200_ONH PUMP 2 ON HMI
280 04125 55FPMP200_ONM PUMP 2 ON MODE
281 02080 55FPMP200_OFH PUMP 2 OFF HMI
282 04126 55FPMP200_OFM PUMP 2 OFF MODE
283 02081 55FPMP200_AUH PUMP 2 AUTO HMI
284 04127 55FPMP200_AUM PUMP 2 AUTO MODE
285
286 10050 55FHS200B PUMP 2 REMOTE D03-R01-S05-P02
287 10051 55FHS200J PUMP 2 HAND D03-R01-S05-P03
288 04131 55FPMP200_HND PUMP 2 HAND
289
290 04123 55FPMP200_DIS PUMP 2 DISABLE MODE
291 04124 55FPMP200_WAT PUMP 2 WAIT
292
293 04130 55FPMP200_ON PUMP 2 ON
294 00008 55FYL200L PUMP 2 ON D02-R01-S04-P08
295 00087 55FYL200P PUMP 2 LCPA ON D03-R01-S10-P07
296
297 44068 55FPMP200_MOD PUMP 2 MODE DISPLAY 0-4095 MODE
298 44067 55FPMP200_SYM PUMP 2 SYMBOL DISPLAY 0-4095 SYMBOL
299 44049 55FPB200_DUT PUMP 2 DUTY DISPLAY 0-4095 DUTY
300
301 04135 55FPMP200_FAA PUMP 2 FAIL ALARM
302 02085 55FPMP200_FAH PUMP 2 FAIL ACK HMI
303 04136 55FPMP200_FAK PUMP 2 FAIL ALM ACK
304
305 10049 55FYS200M PUMP 2 PROTECT ON D03-R01-S05-P01
306 04066 55FYS200M_ALA PUMP 2 PROTECT ON ALM
307 02045 55FYS200M_ALH PUMP 2 ALARM ACK HMI
308 04067 55FYS200M_ALK PUMP 2 ALARM ACK
309
310 04137 55FPMP200_COA PUMP 2 COMMON ALARM
311 04138 55FPMP200_COK PUMP 2 COMMON ALM ACK
312 00024 55FYA200B PUMP 2 TROUBLE ALM D02-R01-S05-P08
313
314 02084 55FPMP200_ALR PUMP 2 ALARM RESET HMI
315 00107 55FPMP200H PUMP 2 PLC RESET D04-R01-S04-P03
316
317 44071 55FPMP200_RTC PUMP 2 RUNTME CURR DAY 0-999.9 HOURS
318 44072 55FPMP200_RTP PUMP 2 RUNTME PREV DAY 0-999.9 HOURS
319 44069 55FPMP200_RTM PUMP 2 RUNTME CUMM MSD 0-9999 HRS x100
320 44070 55FPMP200_RTL PUMP 2 RUNTME CUMM LSD 0-999.9 HOURS
321 02086 55FPMP200_RTR PUMP 2 RUNTIME RESET
322
17410 Attachment - Sample Test Sheet Page 8 of 35 9/22/2020 1:05 PM
DR
A
F
T
,-
[] ,--~ ~ ~ I~ ,_
,--
,_
--,_ -
,_ -
,_ -
,_ -
,_ -
--
~
~ ~ ~
[] :J :J :J l:J
B :J -:J l:J ,_
~ ,_ ~ I~ -
C C C C
C C C C
9:: 9:: 9:: 9:: n
:J :J
,_
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
323 10054 55FYS200A PUMP 2 VS READY D03-R01-S05-P06
324 04133 55FYS200A_RDY PUMP 2 VS READY
325 10053 55FYS200 PUMP 2 VS ON D03-R01-S05-P05
326
327 30010 55FST200 PUMP 2 VS SPEED 0-100 PERCENT D04-R01-S06-P01
328 44066 55FPMP200_SPD PUMP 2 VS SPEED 0-100 PERCENT
329 44094 55FST200_RPM PUMP 2 SPEED 0-1188 RPM
330
331 40009 55FSC200 PUMP 2 VS SPEED 0-100 PERCENT D04-R01-S08-P01
332
333 10052 55FHS200K PUMP 2 VS SELECT D03-R01-S05-P04
334 04132 55FPMP200_VSS PUMP 2 VS SELECTED
335
336 42044 55FPMP200_SRS PUMP 2 VS SPEED RAMP SET 0.1-100 RAMP
337 44065 55FPMP200_SRP PUMP 2 VS SPEED RAMP SP 0.1-100 RAMP
338
339 00105 55FPMP200 PUMP 2 VS RUN D04-R01-S04-P01
340
341 02077 55FPA200_AAH PUMP 2 A/M AUTO HMI
342 04121 55FPA200_AAM PUMP 2 A/M AUTO MODE
343 02078 55FPA200_AMH PUMP 2 A/M MANUAL HMI
344 04122 55FPA200_AMM PUMP 2 A/M MANUAL MODE
345
346 42043 55FPA200_AMS PUMP 2 A/M MAN SPD SET 0-100 PERCENT
347 44063 55FPA200_AMP PUMP 2 A/M SPEED SP 0-100 PERCENT
348 44064 55FPA200_AMB PUMP 2 A/M SPEED BAR 0-100 PERCENT
349
350 10055 55FYS200B PUMP 2 VS TROUBLE D03-R01-S05-P07
351 04072 55FYS200B_ALA PUMP 2 VS TROUBLE ALARM
352 02048 55FYS200B_ALH PUMP 2 VS ALARM ACK HMI
353 04073 55FYS200B_ALK PUMP 2 VS ALARM ACK
354
355 10056 55FHS200H PUMP 2 VS RESET D03-R01-S05-P08
356
357 10106 55FHS200L PUMP 2 VS LCPA START D03-R01-S08-P10
358 10107 55FHS200M PUMP 2 VS LCPA STOP D03-R01-S08-P11
359
17410 Attachment - Sample Test Sheet Page 9 of 35 9/22/2020 1:05 PM
DR
A
F
T
~
:J :J :J
--
,_ -
,_ -
,_ -
--
C C C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
360 44197 55FIIT200A_AMP PUMP 2 VFD AMPS PHASE A
361 44198 55FIIT200B_AMP PUMP 2 VFD AMPS PHASE B
362 44199 55FIIT200C_AMP PUMP 2 VFD AMPS PHASE C
363
364 04352 55FISH200L_ALA PUMP 2 VFD OVERLD TRIP ALM
365 02195 55FISH200L_ALH PUMP 2 VFD ALARM ACK HMI
366 04353 55FISH200L_ALK PUMP 2 VFD ALARM ACK
367
368 04354 55FTSH200J_ALA PUMP 2 VFD INV OVRHEAT ALM
369 02196 55FTSH200J_ALH PUMP 2 VFD ALARM ACK HMI
370 04355 55FTSH200J_ALK PUMP 2 VFD ALARM ACK
371
372 04356 55FESL200J_ALA PUMP 2 VFD LO DC VOLT ALM
373 02197 55FESL200J_ALH PUMP 2 VFD ALARM ACK HMI
374 04357 55FESL200J_ALK PUMP 2 VFD ALARM ACK
375
376 04358 55FYS200Q_ALA PUMP 2 VFD HARDWAR FLT ALM
377 02198 55FYS200Q_ALH PUMP 2 VFD ALARM ACK HMI
378 04359 55FYS200Q_ALK PUMP 2 VFD ALARM ACK
379
380 04360 55FESH200J_ALA PUMP 2 VFD HI DC VOLT ALM
381 02199 55FESH200J_ALH PUMP 2 VFD ALARM ACK HMI
382 04361 55FESH200J_ALK PUMP 2 VFD ALARM ACK
383
384 04384 55FPMP200_ALM PUMP 2 VFD COMM FAIL ALARM
385
386 10058 55FYS200L PUMP 2 CS READY D03-R01-S05-P10
387 04134 55FYS200L_RDY PUMP 2 CS READY
388 00106 55FPMP200B PUMP 2 CS RUN D04-R01-S04-P02
389 10057 55FYS200J PUMP 2 CS ON D03-R01-S05-P09
390
391 10059 55FISH200 PUMP 2 CS OVERLOAD D03-R01-S05-P11
392 04074 55FISH200_ALA PUMP 2 CS OVERLOAD ALARM
393 02049 55FISH200_ALH PUMP 2 CS ALARM ACK HMI
394 04075 55FISH200_ALK PUMP 2 CS ALARM ACK
395
17410 Attachment - Sample Test Sheet Page 10 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
C
C
C
C
:::J
:::J
C C C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
396 10060 55FMSH204 PUMP 2 MTR HI MOISTURE D03-R01-S05-P12
397 04070 55FMSH204_ALA PUMP 2 MTR HI MOISTURE ALM
398 02047 55FMSH204_ALH PUMP 2 MTR ALARM ACK HMI
399 04071 55FMSH204_ALK PUMP 2 MTR ALARM ACK
400 00022 55FMAH204 PUMP 2 MTR HI MOISTURE ALM D02-R01-S05-P06
401
402 10061 55FTSH203 PUMP 2 MTR HI WIND TMP D03-R01-S05-P13
403 04068 55FTSH203_ALA PUMP 2 MTR HI WIND TMP ALM
404 02046 55FTSH203_ALH PUMP 2 MTR ALARM ACK HMI
405 04069 55FTSH203_ALK PUMP 2 MTR ALARM ACK
406 00023 55FTAH203 PUMP 2 MTR HI WIND TMP ALM D02-R01-S05-P07
407
408 10062 55FZSC205 PUMP 2 CHK VLV CLOSED D03-R01-S05-P14
409 44098 55FZSC205_STA PUMP 2 CHK VLV STATUS DISPLAY 0-4095 STATUS
410 00012 55FZLO205 PUMP 2 CHK VLV OPENED D02-R01-S04-P12
411 00091 55FZLO205A PUMP 2 CV LCPA OPENED D03-R01-S10-P11
412
413 04177 55FZSC205_ALA PUMP 2 CHK VLV CLOSED ALARM
414 02108 55FZSC205_ALH PUMP 2 CHK VLV ALARM ACK HMI
415 04178 55FZSC205_ALK PUMP 2 CHK VLV ALARM ACK
416
17410 Attachment - Sample Test Sheet Page 11 of 35 9/22/2020 1:05 PM
DR
A
F
T
C C C C
C C C C
[] :J
C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
417 02092 55FPMP300_OSH PUMP 3 OOS HMI
418 04146 55FPMP300_OSM PUMP 3 OOS MODE
419 02093 55FPMP300_ISH PUMP 3 INS HMI
420 04147 55FPMP300_ISM PUMP 3 INS MODE
421
422 02089 55FPMP300_ONH PUMP 3 ON HMI
423 04143 55FPMP300_ONM PUMP 3 ON MODE
424 02090 55FPMP300_OFH PUMP 3 OFF HMI
425 04144 55FPMP300_OFM PUMP 3 OFF MODE
426 02091 55FPMP300_AUH PUMP 3 AUTO HMI
427 04145 55FPMP300_AUM PUMP 3 AUTO MODE
428
429 10130 55FHS300B PUMP 3 REMOTE D05-R01-S03-P02
430 10131 55FHS300J PUMP 3 HAND D05-R01-S03-P03
431 04149 55FPMP300_HND PUMP 3 HAND
432
433 04141 55FPMP300_DIS PUMP 3 DISABLE MODE
434 04142 55FPMP300_WAT PUMP 3 WAIT
435
436 04148 55FPMP300_ON PUMP 3 ON
437 00009 55FYL300L PUMP 3 ON D02-R01-S04-P09
438 00088 55FYL300P PUMP 3 LCPA ON D03-R01-S10-P08
439
440 44078 55FPMP300_MOD PUMP 3 MODE DISPLAY 0-4095 MODE
441 44077 55FPMP300_SYM PUMP 3 SYMBOL DISPLAY 0-4095 SYMBOL
442 44050 55FPB300_DUT PUMP 3 DUTY DISPLAY 0-4095 DUTY
443
444 04153 55FPMP300_FAA PUMP 3 FAIL ALARM
445 02095 55FPMP300_FAH PUMP 3 FAIL ACK HMI
446 04154 55FPMP300_FAK PUMP 3 FAIL ALM ACK
447
448 10129 55FYS300M PUMP 3 PROTECT ON D05-R01-S03-P01
449 04076 55FYS300M_ALA PUMP 3 PROTECT ON ALM
450 02050 55FYS300M_ALH PUMP 3 ALARM ACK HMI
451 04077 55FYS300M_ALK PUMP 3 ALARM ACK
452
453 04155 55FPMP300_COA PUMP 3 COMMON ALARM
454 04156 55FPMP300_COK PUMP 3 COMMON ALM ACK
455 00029 55FYA300B PUMP 3 TROUBLE ALM D02-R01-S05-P13
456
457 02094 55FPMP300_ALR PUMP 3 ALARM RESET HMI
458 00115 55FPMP300H PUMP 3 PLC RESET D06-R01-S03-P03
459
460 44081 55FPMP300_RTC PUMP 3 RUNTME CURR DAY 0-999.9 HOURS
461 44082 55FPMP300_RTP PUMP 3 RUNTME PREV DAY 0-999.9 HOURS
462 44079 55FPMP300_RTM PUMP 3 RUNTME CUMM MSD 0-9999 HRS x100
463 44080 55FPMP300_RTL PUMP 3 RUNTME CUMM LSD 0-999.9 HOURS
464 02096 55FPMP300_RTR PUMP 3 RUNTIME RESET
465
17410 Attachment - Sample Test Sheet Page 12 of 35 9/22/2020 1:05 PM
DR
A
F
T
,-
[] ,--~ ~ ~ I~ ,_
,--
,_
--,_ -
,_ -
,_ -
,_ -
,_ -
--
~
~ ~ ~
[] :J :J :J l:J
B :J -:J l:J ,_
~ ,_ ~ I~ -
C C C C
C C C C
9:: 9:: 9:: 9:: n
:J :J
,_
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
466 10134 55FYS300A PUMP 3 VS READY D05-R01-S03-P06
467 04151 55FYS300A_RDY PUMP 3 VS READY
468 10133 55FYS300 PUMP 3 VS ON D05-R01-S03-P05
469
470 30019 55FST300 PUMP 3 VS SPEED 0-100 PERCENT D06-R01-S07-P01
471 44076 55FPMP300_SPD PUMP 3 VS SPEED 0-100 PERCENT
472 44095 55FST300_RPM PUMP 3 SPEED 0-1188 RPM
473
474 40021 55FSC300 PUMP 3 VS SPEED 0-100 PERCENT D06-R01-S09-P01
475
476 10132 55FHS300K PUMP 3 VS SELECT D05-R01-S03-P04
477 04150 55FPMP300_VSS PUMP 3 VS SELECTED
478
479 42046 55FPMP300_SRS PUMP 3 VS SPEED RAMP SET 0.1-100 RAMP
480 44075 55FPMP300_SRP PUMP 3 VS SPEED RAMP SP 0.1-100 RAMP
481
482 00113 55FPMP300 PUMP 3 VS RUN D06-R01-S03-P01
483
484 02087 55FPA300_AAH PUMP 3 A/M AUTO HMI
485 04139 55FPA300_AAM PUMP 3 A/M AUTO MODE
486 02088 55FPA300_AMH PUMP 3 A/M MANUAL HMI
487 04140 55FPA300_AMM PUMP 3 A/M MANUAL MODE
488
489 42045 55FPA300_AMS PUMP 3 A/M MAN SPD SET 0-100 PERCENT
490 44073 55FPA300_AMP PUMP 3 A/M SPEED SP 0-100 PERCENT
491 44074 55FPA300_AMB PUMP 3 A/M SPEED BAR 0-100 PERCENT
492
493 10135 55FYS300B PUMP 3 VS TROUBLE D05-R01-S03-P07
494 04082 55FYS300B_ALA PUMP 3 VS TROUBLE ALARM
495 02053 55FYS300B_ALH PUMP 3 VS ALARM ACK HMI
496 04083 55FYS300B_ALK PUMP 3 VS ALARM ACK
497
498 10136 55FHS300H PUMP 3 VS RESET D05-R01-S03-P08
499
500 10108 55FHS300L PUMP 3 VS LCPA START D03-R01-S08-P12
501 10109 55FHS300M PUMP 3 VS LCPA STOP D03-R01-S08-P13
502
17410 Attachment - Sample Test Sheet Page 13 of 35 9/22/2020 1:05 PM
DR
A
F
T
~
:J
--
,_ -
,_ -
,_ -
--
C C C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
503 44200 55FIIT300A_AMP PUMP 3 VFD AMPS PHASE A
504 44201 55FIIT300B_AMP PUMP 3 VFD AMPS PHASE B
505 44202 55FIIT300C_AMP PUMP 3 VFD AMPS PHASE C
506
507 04362 55FISH300L_ALA PUMP 3 VFD OVERLD TRIP ALM
508 02200 55FISH300L_ALH PUMP 3 VFD ALARM ACK HMI
509 04363 55FISH300L_ALK PUMP 3 VFD ALARM ACK
510
511 04364 55FTSH300J_ALA PUMP 3 VFD INV OVRHEAT ALM
512 02201 55FTSH300J_ALH PUMP 3 VFD ALARM ACK HMI
513 04365 55FTSH300J_ALK PUMP 3 VFD ALARM ACK
514
515 04366 55FESL300J_ALA PUMP 3 VFD LO DC VOLT ALM
516 02202 55FESL300J_ALH PUMP 3 VFD ALARM ACK HMI
517 04367 55FESL300J_ALK PUMP 3 VFD ALARM ACK
518
519 04368 55FYS300Q_ALA PUMP 3 VFD HARDWAR FLT ALM
520 02203 55FYS300Q_ALH PUMP 3 VFD ALARM ACK HMI
521 04369 55FYS300Q_ALK PUMP 3 VFD ALARM ACK
522
523 04370 55FESH300J_ALA PUMP 3 VFD HI DC VOLT ALM
524 02204 55FESH300J_ALH PUMP 3 VFD ALARM ACK HMI
525 04371 55FESH300J_ALK PUMP 3 VFD ALARM ACK
526
527 04385 55FPMP300_ALM PUMP 3 VFD COMM FAIL ALARM
528
529 10138 55FYS300L PUMP 3 CS READY D05-R01-S03-P10
530 04152 55FYS300L_RDY PUMP 3 CS READY
531 00114 55FPMP300B PUMP 3 CS RUN D06-R01-S03-P02
532 10137 55FYS300J PUMP 3 CS ON D05-R01-S03-P09
533
534 10139 55FISH300 PUMP 3 CS OVERLOAD D05-R01-S03-P11
535 04084 55FISH300_ALA PUMP 3 CS OVERLOAD ALARM
536 02054 55FISH300_ALH PUMP 3 CS ALARM ACK HMI
537 04085 55FISH300_ALK PUMP 3 CS ALARM ACK
538
17410 Attachment - Sample Test Sheet Page 14 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
C
C
C
C
:::J
:::J
C C C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
539 10140 55FMSH304 PUMP 3 MTR HI MOISTURE D05-R01-S03-P12
540 04080 55FMSH304_ALA PUMP 3 MTR HI MOISTURE ALM
541 02052 55FMSH304_ALH PUMP 3 MTR ALARM ACK HMI
542 04081 55FMSH304_ALK PUMP 3 MTR ALARM ACK
543 00027 55FMAH304 PUMP 3 MTR HI MOISTURE ALM D02-R01-S05-P11
544
545 10141 55FTSH303 PUMP 3 MTR HI WIND TMP D05-R01-S03-P13
546 04078 55FTSH303_ALA PUMP 3 MTR HI WIND TMP ALM
547 02051 55FTSH303_ALH PUMP 3 MTR ALARM ACK HMI
548 04079 55FTSH303_ALK PUMP 3 MTR ALARM ACK
549 00028 55FTAH303 PUMP 3 MTR HI WIND TMP ALM D02-R01-S05-P12
550
551 10142 55FZSC305 PUMP 3 CHK VLV CLOSED D05-R01-S03-P14
552 44099 55FZSC305_STA PUMP 3 CHK VLV STATUS DISPLAY 0-4095 STATUS
553 00013 55FZLO305 PUMP 3 CHK VLV OPENED D02-R01-S04-P13
554 00092 55FZLO305A PUMP 3 CV LCPA OPENED D03-R01-S10-P12
555
556 04179 55FZSC305_ALA PUMP 3 CHK VLV CLOSED ALARM
557 02109 55FZSC305_ALH PUMP 3 CHK VLV ALARM ACK HMI
558 04180 55FZSC305_ALK PUMP 3 CHK VLV ALARM ACK
559
17410 Attachment - Sample Test Sheet Page 15 of 35 9/22/2020 1:05 PM
DR
A
F
T
C C C C
C C C C
[] :J
C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
560 02102 55FPMP400_OSH PUMP 4 OOS HMI
561 04164 55FPMP400_OSM PUMP 4 OOS MODE
562 02103 55FPMP400_ISH PUMP 4 INS HMI
563 04165 55FPMP400_ISM PUMP 4 INS MODE
564
565 02099 55FPMP400_ONH PUMP 4 ON HMI
566 04161 55FPMP400_ONM PUMP 4 ON MODE
567 02100 55FPMP400_OFH PUMP 4 OFF HMI
568 04162 55FPMP400_OFM PUMP 4 OFF MODE
569 02101 55FPMP400_AUH PUMP 4 AUTO HMI
570 04163 55FPMP400_AUM PUMP 4 AUTO MODE
571
572 10146 55FHS400B PUMP 4 REMOTE D05-R01-S04-P02
573 10147 55FHS400J PUMP 4 HAND D05-R01-S04-P03
574 04167 55FPMP400_HND PUMP 4 HAND
575
576 04159 55FPMP400_DIS PUMP 4 DISABLE MODE
577 04160 55FPMP400_WAT PUMP 4 WAIT
578
579 04166 55FPMP400_ON PUMP 4 ON
580 00010 55FYL400L PUMP 4 ON D02-R01-S04-P10
581 00089 55FYL400P PUMP 4 LCPA ON D03-R01-S10-P09
582
583 44088 55FPMP400_MOD PUMP 4 MODE DISPLAY 0-4095 MODE
584 44087 55FPMP400_SYM PUMP 4 SYMBOL DISPLAY 0-4095 SYMBOL
585 44051 55FPB400_DUT PUMP 4 DUTY DISPLAY 0-4095 DUTY
586
587 04171 55FPMP400_FAA PUMP 4 FAIL ALARM
588 02105 55FPMP400_FAH PUMP 4 FAIL ACK HMI
589 04172 55FPMP400_FAK PUMP 4 FAIL ALM ACK
590
591 10145 55FYS400M PUMP 4 PROTECT ON D05-R01-S04-P01
592 04086 55FYS400M_ALA PUMP 4 PROTECT ON ALM
593 02055 55FYS400M_ALH PUMP 4 ALARM ACK HMI
594 04087 55FYS400M_ALK PUMP 4 ALARM ACK
595
596 04173 55FPMP400_COA PUMP 4 COMMON ALARM
597 04174 55FPMP400_COK PUMP 4 COMMON ALM ACK
598 00034 55FYA400B PUMP 4 TROUBLE ALM D02-R01-S06-P02
599
600 02104 55FPMP400_ALR PUMP 4 ALARM RESET HMI
601 00123 55FPMP400H PUMP 4 PLC RESET D06-R01-S04-P03
602
603 44091 55FPMP400_RTC PUMP 4 RUNTME CURR DAY 0-999.9 HOURS
604 44092 55FPMP400_RTP PUMP 4 RUNTME PREV DAY 0-999.9 HOURS
605 44089 55FPMP400_RTM PUMP 4 RUNTME CUMM MSD 0-9999 HRS x100
606 44090 55FPMP400_RTL PUMP 4 RUNTME CUMM LSD 0-999.9 HOURS
607 02106 55FPMP400_RTR PUMP 4 RUNTIME RESET
608
17410 Attachment - Sample Test Sheet Page 16 of 35 9/22/2020 1:05 PM
DR
A
F
T
,-
[] ,--~ ~ ~ I~ ,_
,--
,_
--,_ -
,_ -
,_ -
,_ -
,_ -
--
~
~ ~ ~
[] :J :J :J l:J
B :J -:J l:J ,_
~ ,_ ~ I~ -
C C C C
C C C C
9:: 9:: 9:: 9:: n
:J :J
,_
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
609 10150 55FYS400A PUMP 4 VS READY D05-R01-S04-P06
610 04169 55FYS400A_RDY PUMP 4 VS READY
611 10149 55FYS400 PUMP 4 VS ON D05-R01-S04-P05
612
613 30028 55FST400 PUMP 4 VS SPEED 0-100 PERCENT D06-R01-S08-P01
614 44086 55FPMP400_SPD PUMP 4 VS SPEED 0-100 PERCENT
615 44096 55FST400_RPM PUMP 4 SPEED 0-1188 RPM
616
617 40025 55FSC400 PUMP 4 VS SPEED 0-100 PERCENT D06-R01-S10-P01
618
619 10148 55FHS400K PUMP 4 VS SELECT D05-R01-S04-P04
620 04168 55FPMP400_VSS PUMP 4 VS SELECTED
621
622 42048 55FPMP400_SRS PUMP 4 VS SPEED RAMP SET 0.1-100 RAMP
623 44085 55FPMP400_SRP PUMP 4 VS SPEED RAMP SP 0.1-100 RAMP
624
625 00121 55FPMP400 PUMP 4 VS RUN D06-R01-S04-P01
626
627 02097 55FPA400_AAH PUMP 4 A/M AUTO HMI
628 04157 55FPA400_AAM PUMP 4 A/M AUTO MODE
629 02098 55FPA400_AMH PUMP 4 A/M MANUAL HMI
630 04158 55FPA400_AMM PUMP 4 A/M MANUAL MODE
631
632 42047 55FPA400_AMS PUMP 4 A/M MAN SPD SET 0-100 PERCENT
633 44083 55FPA400_AMP PUMP 4 A/M SPEED SP 0-100 PERCENT
634 44084 55FPA400_AMB PUMP 4 A/M SPEED BAR 0-100 PERCENT
635
636 10151 55FYS400B PUMP 4 VS TROUBLE D05-R01-S04-P07
637 04092 55FYS400B_ALA PUMP 4 VS TROUBLE ALARM
638 02058 55FYS400B_ALH PUMP 4 VS ALARM ACK HMI
639 04093 55FYS400B_ALK PUMP 4 VS ALARM ACK
640
641 10152 55FHS400H PUMP 4 VS RESET D05-R01-S04-P08
642
643 10110 55FHS400L PUMP 4 VS LCPA START D03-R01-S08-P14
644 10111 55FHS400M PUMP 4 VS LCPA STOP D03-R01-S08-P15
645
17410 Attachment - Sample Test Sheet Page 17 of 35 9/22/2020 1:05 PM
DR
A
F
T
~
:J
--
,_ -
,_ -
,_ -
--
C C C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
646 44203 55FIIT400A_AMP PUMP 4 VFD AMPS PHASE A
647 44204 55FIIT400B_AMP PUMP 4 VFD AMPS PHASE B
648 44205 55FIIT400C_AMP PUMP 4 VFD AMPS PHASE C
649
650 04372 55FISH400L_ALA PUMP 4 VFD OVERLD TRIP ALM
651 02205 55FISH400L_ALH PUMP 4 VFD ALARM ACK HMI
652 04373 55FISH400L_ALK PUMP 4 VFD ALARM ACK
653
654 04374 55FTSH400J_ALA PUMP 4 VFD INV OVRHEAT ALM
655 02206 55FTSH400J_ALH PUMP 4 VFD ALARM ACK HMI
656 04375 55FTSH400J_ALK PUMP 4 VFD ALARM ACK
657
658 04376 55FESL400J_ALA PUMP 4 VFD LO DC VOLT ALM
659 02207 55FESL400J_ALH PUMP 4 VFD ALARM ACK HMI
660 04377 55FESL400J_ALK PUMP 4 VFD ALARM ACK
661
662 04378 55FYS400Q_ALA PUMP 4 VFD HARDWAR FLT ALM
663 02208 55FYS400Q_ALH PUMP 4 VFD ALARM ACK HMI
664 04379 55FYS400Q_ALK PUMP 4 VFD ALARM ACK
665
666 04380 55FESH400J_ALA PUMP 4 VFD HI DC VOLT ALM
667 02209 55FESH400J_ALH PUMP 4 VFD ALARM ACK HMI
668 04381 55FESH400J_ALK PUMP 4 VFD ALARM ACK
669
670 04386 55FPMP400_ALM PUMP 4 VFD COMM FAIL ALARM
671
672 10154 55FYS400L PUMP 4 CS READY D05-R01-S04-P10
673 04170 55FYS400L_RDY PUMP 4 CS READY
674 00122 55FPMP400B PUMP 4 CS RUN D06-R01-S04-P02
675 10153 55FYS400J PUMP 4 CS ON D05-R01-S04-P09
676
677 10155 55FISH400 PUMP 4 CS OVERLOAD D05-R01-S04-P11
678 04094 55FISH400_ALA PUMP 4 CS OVERLOAD ALARM
679 02059 55FISH400_ALH PUMP 4 CS ALARM ACK HMI
680 04095 55FISH400_ALK PUMP 4 CS ALARM ACK
681
17410 Attachment - Sample Test Sheet Page 18 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
C
C
C
C
:::J
:::J
C C C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
682 10156 55FMSH404 PUMP 4 MTR HI MOISTURE D05-R01-S04-P12
683 04090 55FMSH404_ALA PUMP 4 MTR HI MOISTURE ALM
684 02057 55FMSH404_ALH PUMP 4 MTR ALARM ACK HMI
685 04091 55FMSH404_ALK PUMP 4 MTR ALARM ACK
686 00032 55FMAH404 PUMP 4 MTR HI MOISTURE ALM D02-R01-S05-P16
687
688 10157 55FTSH403 PUMP 4 MTR HI WIND TMP D05-R01-S04-P13
689 04088 55FTSH403_ALA PUMP 4 MTR HI WIND TMP ALM
690 02056 55FTSH403_ALH PUMP 4 MTR ALARM ACK HMI
691 04089 55FTSH403_ALK PUMP 4 MTR ALARM ACK
692 00033 55FTAH403 PUMP 4 MTR HI WIND TMP ALM D02-R01-S06-P01
693
694 10158 55FZSC405 PUMP 4 CHK VLV CLOSED D05-R01-S04-P14
695 44100 55FZSC405_STA PUMP 4 CHK VLV STATUS DISPLAY 0-4095 STATUS
696 00014 55FZLO405 PUMP 4 CHK VLV OPENED D02-R01-S04-P14
697 00093 55FZLO405A PUMP 4 CV LCPA OPENED D03-R01-S10-P13
698
699 04181 55FZSC405_ALA PUMP 4 CHK VLV CLOSED ALARM
700 02110 55FZSC405_ALH PUMP 4 CHK VLV ALARM ACK HMI
701 04182 55FZSC405_ALK PUMP 4 CHK VLV ALARM ACK
702
703 44052 55FPB500_DUT PUMP 5 DUTY DISPLAY 0-4095 DUTY
704
17410 Attachment - Sample Test Sheet Page 19 of 35 9/22/2020 1:05 PM
DR
A
F
T
C C C C
C C C C
[] :J
C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
705 02062 55FPB100_S1H PUMPS DUTY SEQ1 HMI
706 10006 55FHS049J PUMP SEQ 1234 SELECT D02-R01-S03-P06
707 04098 55FPB100_S1M PUMPS DUTY SEQ1 MODE
708 00003 55FYL049J PUMP SEQ 1234 SELECTED D02-R01-S04-P03
709
710 02063 55FPB100_S2H PUMPS DUTY SEQ2 HMI
711 10007 55FHS049M PUMP SEQ 2341 SELECT D02-R01-S03-P07
712 04099 55FPB100_S2M PUMPS DUTY SEQ2 MODE
713 00004 55FYL049M PUMP SEQ 2341 SELECTED D02-R01-S04-P04
714
715 02064 55FPB100_S3H PUMPS DUTY SEQ3 HMI
716 10008 55FHS049N PUMP SEQ 3412 SELECT D02-R01-S03-P08
717 04100 55FPB100_S3M PUMPS DUTY SEQ3 MODE
718 00005 55FYL049N PUMP SEQ 3412 SELECTED D02-R01-S04-P05
719
720 02065 55FPB100_S4H PUMPS DUTY SEQ4 HMI
721 10009 55FHS049P PUMP SEQ 4123 SELECT D02-R01-S03-P09
722 04101 55FPB100_S4M PUMPS DUTY SEQ4 MODE
723 00006 55FYL049P PUMP SEQ 4123 SELECTED D02-R01-S04-P06
724
725 02066 55FPB100_S5H PUMPS DUTY SEQ5 HMI
726 04102 55FPB100_S5M PUMPS DUTY SEQ5 MODE
727
728 42031 55FPB100_LSS PUMPS LD STRT LVL SET 0-300 INCHES
729 44038 55FPB100_LSP PUMPS LD STRT LVL SP 0-300 INCHES
730 42032 55FPB100_LTS PUMPS LD STOP LVL SET 0-300 INCHES
731 44039 55FPB100_LTP PUMPS LD STOP LVL SP 0-300 INCHES
732 42033 55FPB100_1SS PUMPS L1 STRT SPD SET 50-100 PERCENT
733 44040 55FPB100_1SP PUMPS L1 STRT SPD SP 50-100 PERCENT
734 42034 55FPB100_1TS PUMPS L1 STOP SPD SET 50-100 PERCENT
735 44041 55FPB100_1TP PUMPS L1 STOP SPD SP 50-100 PERCENT
736 42035 55FPB100_2SS PUMPS L2 STRT SPD SET 50-100 PERCENT
737 44042 55FPB100_2SP PUMPS L2 STRT SPD SP 50-100 PERCENT
738 42036 55FPB100_2TS PUMPS L2 STOP SPD SET 50-100 PERCENT
739 44043 55FPB100_2TP PUMPS L2 STOP SPD SP 50-100 PERCENT
740
741 42038 55FPB100_3TS PUMPS L3 STOP SPD SET 0-100 PERCENT
742 44045 55FPB100_3TP PUMPS L3 STOP SPD SP 0-100 PERCENT
743 42037 55FPB100_3SS PUMPS L3 STRT SPD SET 0-100 PERCENT
744 44044 55FPB100_3SP PUMPS L3 STRT SPD SP 0-100 PERCENT
745 42040 55FPB100_4TS PUMPS L4 STOP SPD SET 0-100 PERCENT
746 44047 55FPB100_4TP PUMPS L4 STOP SPD SP 0-100 PERCENT
747 42039 55FPB100_4SS PUMPS L4 STRT SPD SET 0-100 PERCENT
748 44046 55FPB100_4SP PUMPS L4 STRT SPD SP 0-100 PERCENT
17410 Attachment - Sample Test Sheet Page 20 of 35 9/22/2020 1:05 PM
DR
A
F
T
[]
[]
[]
[]
[]
[]
[]
[]
,_ --,_ ---,_ ----,_
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
749
750 42025 55FPE100_MLS PUMPS M/L MAN LVL SET 0-300 INCHES
751 44029 55FPE100_MLP PUMPS M/L LEVEL SP 0-300 INCHES
752 44030 55FPE100_MLB PUMPS M/L LEVEL BAR 0-300 INCHES
753 44035 55FPD100_PPV PUMPS PID PROC VAR 0-300 INCHES
754
755 02060 55FPC100_AAH PUMPS A/M AUTO HMI
756 04096 55FPC100_AAM PUMPS A/M AUTO MODE
757 02061 55FPC100_AMH PUMPS A/M MANUAL HMI
758 04097 55FPC100_AMM PUMPS A/M MANUAL MODE
759 42030 55FPC100_AMS PUMPS A/M MAN SPD SET 50-100 PERCENT
760 44036 55FPC100_AMP PUMPS A/M SPEED SP 0-100 PERCENT
761 44037 55FPC100_AMB PUMPS A/M SPEED BAR 0-100 PERCENT
762
763 42026 55FPD100_PRS PUMPS PID RMPRATE SET 0.1-100 RAMP
764 44031 55FPD100_PRP PUMPS PID RAMPRATE SP 0.1-100 RAMP
765 42027 55FPD100_PPS PUMPS PID PROP SET 5-500 PROP
766 44032 55FPD100_PPP PUMPS PID PROP SP 5-500 PROP
767 42028 55FPD100_PIS PUMPS PID INTEG SET 0-99.99 INTG
768 44033 55FPD100_PIP PUMPS PID INTEG SP 0-99.99 INTG
769 42029 55FPD100_PDS PUMPS PID DERV SET 0-99.99 DERV
770 44034 55FPD100_PDP PUMPS PID DERV SEP 0-99.99 DERV
771
772 30012 55FFIT075 DISCHARGE FLOW 0-10 MGD D04-R01-S06-P03
773 44106 55FFIT075_FLO DISCHARGE FLOW 0-10 MGD
774 40003 55FFI075 DISCHARGE LCP FLOW 0-10 MGD D02-R01-S10-P03
775 40015 55FFI075A DISCHARGE LCPA FLOW 0-10 MGD D04-R01-S09-P03
776
777 44109 55FFIT075_CAF DISCHARGE CUR AVERAGE FLO 0-10 MGD
778 44110 55FFIT075_CHF DISCHARGE CUR HIGHEST FLO 0-10 MGD
779 44111 55FFIT075_CLF DISCHARGE CUR LOWEST FLO 0-10 MGD
780 44107 55FFIT075_CTM DISCHARGE CUR TOT FLO MSD 0-9999 MGD x10
781 44108 55FFIT075_CTL DISCHARGE CUR TOT FLO LSD 0-9.999 MGD
782 44114 55FFIT075_PAF DISCHARGE PRV AVERAGE FLO 0-10 MGD
783 44115 55FFIT075_PHF DISCHARGE PRV HIGHEST FLO 0-10 MGD
784 44116 55FFIT075_PLF DISCHARGE PRV LOWEST FLO 0-10 MGD
785 44112 55FFIT075_PTM DISCHARGE PRV TOT FLO MSD 0-9999 MGD x10
786 44113 55FFIT075_PTL DISCHARGE PRV TOT FLO LSD 0-9.999 MGD
787
788 10070 55FYS075B DISCHARGE FLOW XMTR TRBL D03-R01-S06-P06
789 04193 55FYS075B_ALA DISCHARGE FLOW XMTR TRBL ALM
790 02115 55FYS075B_ALH DISCHARGE FLOW ALARM ACK HMI
791 04194 55FYS075B_ALK DISCHARGE FLOW ALARM ACK
792 00108 55FYS075 DISCHARGE FLOW XMTR ZERO D04-R01-S04-P04
793
17410 Attachment - Sample Test Sheet Page 21 of 35 9/22/2020 1:05 PM
DR
A
F
T
---
,_ - -
,_ - -
,_ - -
-
-
-
-
-
-
-
-
-
C C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
794 30004 55FPIT070 DISCHARGE PRESSURE 0-50 PSI D04-R01-S05-P04
795 44101 55FPIT070_PRS DISCHARGE PRESSURE 0-50 PSI
796
797 42052 55FPIT070_LLS DISCHARGE LOLO PRS SET 0-50 PSI
798 44105 55FPIT070_LLP DISCHARGE LOLO PRS SP 0-50 PSI
799 04189 55FPIT070_LLA DISCHARGE LOLO PRS ALM
800 02114 55FPIT070_LLH DISCHARGE LOLO PRS ACKHMI
801 04190 55FPIT070_LLK DISCHARGE LOLO PRS ALMACK
802
803 42051 55FPIT070_LS DISCHARGE LO PRS SET 0-50 PSI
804 44104 55FPIT070_LP DISCHARGE LO PRS SP 0-50 PSI
805 04187 55FPIT070_LA DISCHARGE LO PRS ALARM
806 02113 55FPIT070_LH DISCHARGE LO PRS ACKHMI
807 04188 55FPIT070_LK DISCHARGE LO PRS ALMACK
808
809 42050 55FPIT070_HS DISCHARGE HI PRS SET 0-50 PSI
810 44103 55FPIT070_HP DISCHARGE HI PRS SP 0-50 PSI
811 04185 55FPIT070_HA DISCHARGE HI PRS ALM
812 02112 55FPIT070_HH DISCHARGE HI PRS ACKHMI
813 04186 55FPIT070_HK DISCHARGE HI PRS ALMACK
814 00045 55FPAH070 DISCHARGE HI PRS ALM D02-R01-S06-P13
815
816 42049 55FPIT070_HHS DISCHARGE HIHI PRS SET 0-50 PSI
817 44102 55FPIT070_HHP DISCHARGE HIHI PRS SP 0-50 PSI
818 04183 55FPIT070_HHA DISCHARGE HIHI PRS ALM
819 02111 55FPIT070_HHH DISCHARGE HIHI PRS ACKHMI
820 04184 55FPIT070_HHK DISCHARGE HIHI PRS ALMACK
821 00044 55FPAHH070 DISCHARGE HIHI PRS ALM D02-R01-S06-P12
822
823 04192 55FPIT070_COK DISCHARGE COMMON ALM ACK
824 04191 55FPIT070_COA DISCHARGE COMMON ALARM
825
826 10071 55FZSC175 FORCEMAIN VLV1 CLOSED D03-R01-S06-P07
827 44117 55FZSC175_STA FORCEMAIN VLV1 STATUS DISPLAY 0-4095 STATUS
828 44118 55FZSC175_SYM FORCEMAIN VLV1 SYMBOL DISPLAY 0-4095 STATUS
829
830 10084 55FZSC176 FORCEMAIN VLV2 CLOSED D03-R01-S07-P04
831 44119 55FZSC176_STA FORCEMAIN VLV2 STATUS DISPLAY 0-4095 STATUS
832 44120 55FZSC176_SYM FORCEMAIN VLV2 SYMBOL DISPLAY 0-4095 STATUS
833
17410 Attachment - Sample Test Sheet Page 22 of 35 9/22/2020 1:05 PM
DR
A
F
T
C C
C C
C C
C C
9= 9=
B
B
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
834 02120 55FFV556_OSH RECYC VLV OOS HMI
835 04203 55FFV556_OSM RECYC VLV OOS MODE
836 02121 55FFV556_ISH RECYC VLV INS HMI
837 04204 55FFV556_ISM RECYC VLV INS MODE
838
839 10067 55FHS556B RECYC VLV REMOTE D03-R01-S06-P03
840
841 10068 55FYS556 RECYC VLV ON D03-R01-S06-P04
842
843 04201 55FFV556_WAT RECYC VLV WAIT
844
845 30003 55FZT556 RECYC VLV POSITION 0-100 PERCENT D04-R01-S05-P03
846 44131 55FFV556_POS RECYC VLV POSITION 0-100 POSITION
847 40017 55FZI556 RECYC LCPA POSITION 0-100 PERCENT D04-R01-S10-P01
848
849 40006 55FFV556 RECYC VLV POSITION 0-100 PERCENT D04-R01-S07-P02
850
851 44132 55FFV556_SYM RECYC VLV SYMBOL DISPLAY 0-4095 SYMBOL
852
853 04202 55FFV556_OPD RECYC VLV OPENED
854 04205 55FFV556_ON RECYC VLV ON
855 44133 55FFV556_MOD RECYC VLV MODE DISPLAY 0-4095 MODE
856
857 04206 55FFV556_FMA RECYC VLV FAIL2MOVE ALARM
858 02123 55FFV556_FMH RECYC VLV FAL2MOV ACK HMI
859 04207 55FFV556_FMK RECYC VLV FAIL2MOVE ACK
860
861 10069 55FYS556B RECYC VLV TROUBLE D03-R01-S06-P05
862 04208 55FFV556_TRA RECYC VLV TROUBLE ALARM
863 02124 55FFV556_TAH RECYC VLV TROUBLE ACK HMI
864 04209 55FFV556_TRK RECYC VLV TROUBLE ALM ACK
865 00055 55FYA556B RECYC VLV TROUBLE ALM D02-R01-S07-P07
866
867 04211 55FFV556_COK RECYC VLV COMMON ALM ACK
868 04210 55FFV556_COA RECYC VLV COMMON ALARM
869
870 02122 55FFV556_ALR RECYC VLV ALARM RESET HMI
871
17410 Attachment - Sample Test Sheet Page 23 of 35 9/22/2020 1:05 PM
DR
A
F
T
,-
,--
,_
,--
,_
::]
[]
[]
[]
C C
C C
9= 9=
:J
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
872 42053 55FVC556_MLS RECYC VLV M/L MAN LVL SET 0-300 INCHES
873 44122 55FVC556_MLP RECYC VLV M/L LEVEL SP 0-300 INCHES
874 44123 55FVC556_MLB RECYC VLV M/L LEVEL BAR 0-300 INCHES
875
876 44128 55FVB556_PPV RECYC VLV PID PROC VAR 0-300 INCHES
877
878 42054 55FVB556_PRS RECYC VLV PID RMPRATE SET 0.1-100 RAMP
879 44124 55FVB556_PRP RECYC VLV PID RAMPRATE SP 0.1-100 RAMP
880 42055 55FVB556_PPS RECYC VLV PID PROP SET 5-500 PROP
881 44125 55FVB556_PPP RECYC VLV PID PROP SP 5-500 PROP
882 42056 55FVB556_PIS RECYC VLV PID INTEG SET 0-99.99 INTG
883 44126 55FVB556_PIP RECYC VLV PID INTEG SP 0-99.99 INTG
884 42057 55FVB556_PDS RECYC VLV PID DERV SET 0-99.99 DERV
885 44127 55FVB556_PDP RECYC VLV PID DERV SP 0-99.99 DERV
886
887 42058 55FVA556_AMS RECYC VLV A/M MAN POS SET 0-100 PERCENT
888 44129 55FVA556_AMP RECYC VLV A/M POS SP 0-100 PERCENT
889 44130 55FVA556_AMB RECYC VLV A/M POS BAR 0-100 PERCENT
890
891 02119 55FVA556_AMH RECYC VLV A/M MANUAL HMI
892 04200 55FVA556_AMM RECYC VLV A/M MANUAL MODE
893 02118 55FVA556_AAH RECYC VLV A/M AUTO HMI
894 04199 55FVA556_AAM RECYC VLV A/M AUTO MODE
895
896 10102 55FHS556J RECYC VLV LCPA POS SETPT OPEN D03-R01-S08-P06
897 10103 55FHS556K RECYC VLV LCPA POS SETPT CLOSE D03-R01-S08-P07
898
899 30011 55FFIT555 RECYC FLOW 0-5 MGD D04-R01-S06-P02
900 44121 55FFIT555_FLO RECYC FLOW 0-5 MGD
901 40004 55FFI555 RECYC LCP FLOW 0-5 MGD D02-R01-S10-P04
902 40016 55FFI555A RECYC LCPA FLOW 0-5 MGD D04-R01-S09-P04
903
904 10083 55FYS555B RECYC FLOW XMTR TRBL D03-R01-S07-P03
905 04195 55FYS555B_ALA RECYC FLOW XMTR TRBL ALM
906 02116 55FYS555B_ALH RECYC FLOW ALARM ACK HMI
907 04196 55FYS555B_ALK RECYC FLOW ALARM ACK
908 00100 55FYS555 RECYC FLOW XMTR ZERO D04-R01-S03-P04
909
17410 Attachment - Sample Test Sheet Page 24 of 35 9/22/2020 1:05 PM
DR
A
F
T
--- -
- -
--
:::J :::J
-
-
-
-
-
-
-
-
---- -
- -
----- -
- -
- ---
C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
910 00078 55FYL560P CLEANING LCP DISABLED D02-R01-S08-P14
911 10010 55FHS560J CLEANING LCP ACTIVATE D02-R01-S03-P10
912 00077 55FYL560J CLEANING LCP ACTIVATED D02-R01-S08-P13
913
914 00081 55FYL560A CLEANING LCPA READY D03-R01-S10-P01
915 00082 55FYL560N CLEANING LCPA ACTIVATED D03-R01-S10-P02
916 10097 55FHS560K CLEANING LCPA PREPARE D03-R01-S08-P01
917 00083 55FYL560K CLEANING LCPA PREPARED D03-R01-S10-P03
918 10098 55FHS560L CLEANING LCPA START D03-R01-S08-P02
919 00084 55FYL560L CLEANING LCPA STARTED D03-R01-S10-P04
920 10099 55FHS560M CLEANING LCPA END D03-R01-S08-P03
921 00085 55FYL560M CLEANING LCPA ENDED D03-R01-S10-P05
922
923 10101 55FHS560P PUMPS VS LCPA SPEED SETPT DN D03-R01-S08-P05
924 10100 55FHS560N PUMPS VS LCPA SPEED SETPT UP D03-R01-S08-P04
925 40014 55FSI560 PUMPS VS LCPA SPEED D04-R01-S09-P02
926
927 04021 55FPK100_CAM PUMPS CLEANING MODE
928 44021 55FPL100_STA PUMPS CLEANING STATUS
929
930 10180 55FLSH024 DRYWELL HI LEVEL D05-R01-S06-P04
931 04212 55FLSH024_ALA DRYWELL HI LEVEL ALARM
932 02125 55FLSH024_ALH DRYWELL ALARM ACK HMI
933 04213 55FLSH024_ALK DRYWELL ALARM ACK
934 00052 55FLAH024 DRYWELL HI LEVEL ALM D02-R01-S07-P04
935
936 10163 55FLSH029 SUMP HI LEVEL D05-R01-S05-P03
937 04214 55FLSH029_ALA SUMP HI LEVEL ALARM
938 02126 55FLSH029_ALH SUMP ALARM ACK HMI
939 04215 55FLSH029_ALK SUMP ALARM ACK
940 00053 55FLAH029 SUMP HI LEVEL ALM D02-R01-S07-P05
941
942 10162 55FYS020 SUMP PUMP 1 ON D05-R01-S05-P02
943 04216 55FYS020_ON SUMP PUMP 1 ON
944 44134 55FYS020_SYM SUMP PUMP 1 SYMBOL DISPLAY 0-4095
945 00015 55FYL020A SUMP PUMP 1 ON D02-R01-S04-P15
946
947 44137 55FYS020_RTC SUMP PUMP 1 RUNTME CURR DAY 0-999.9 HOURS
948 44138 55FYS020_RTP SUMP PUMP 1 RUNTME PREV DAY 0-999.9 HOURS
949 44135 55FYS020_RTM SUMP PUMP 1 RUNTME CUMM MSD 0-9999 HRS x100
950 44136 55FYS020_RTL SUMP PUMP 1 RUNTME CUMM LSD 0-999.9 HOURS
951 02127 55FYS020_RTR SUMP PUMP 1 RUNTIME RESET
952
17410 Attachment - Sample Test Sheet Page 25 of 35 9/22/2020 1:05 PM
DR
A
F
T
~ ::]
C
C
B []
,_
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
953 10178 55FYS025 SUMP PUMP 2 ON D05-R01-S06-P02
954 04217 55FYS025_ON SUMP PUMP 2 ON
955 44139 55FYS025_SYM SUMP PUMP 2 SYMBOL DISPLAY 0-4095
956 00016 55FYL025A SUMP PUMP 2 ON D02-R01-S04-P16
957
958 44142 55FYS025_RTC SUMP PUMP 2 RUNTME CURR DAY 0-999.9 HOURS
959 44143 55FYS025_RTP SUMP PUMP 2 RUNTME PREV DAY 0-999.9 HOURS
960 44140 55FYS025_RTM SUMP PUMP 2 RUNTME CUMM MSD 0-9999 HRS x100
961 44141 55FYS025_RTL SUMP PUMP 2 RUNTME CUMM LSD 0-999.9 HOURS
962 02128 55FYS025_RTR SUMP PUMP 2 RUNTIME RESET
963
964 10179 55FYS028B SUMP PUMPS TROUBLE D05-R01-S06-P03
965 04218 55FYS028B_ALA SUMP PUMPS TROUBLE ALARM
966 02129 55FYS028B_ALH SUMP PUMPS ALARM ACK HMI
967 04219 55FYS028B_ALK SUMP PUMPS ALARM ACK
968 00054 55FYA028B SUMP PUMPS TROUBLE ALM D02-R01-S07-P06
969
970 10164 55FHS059 DRYWELL FANS PAUSE D05-R01-S05-P04
971
17410 Attachment - Sample Test Sheet Page 26 of 35 9/22/2020 1:05 PM
DR
A
F
T
1=3 []
,_
C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
972 02134 55FFAN053_OSH DRYWELL SF1 OOS HMI
973 04227 55FFAN053_OSM DRYWELL SF1 OOS MODE
974 02135 55FFAN053_ISH DRYWELL SF1 INS HMI
975 04228 55FFAN053_ISM DRYWELL SF1 INS MODE
976
977 02131 55FFAN053_ONH DRYWELL SF1 ON HMI
978 04224 55FFAN053_ONM DRYWELL SF1 ON MODE
979 02132 55FFAN053_OFH DRYWELL SF1 OFF HMI
980 04225 55FFAN053_OFM DRYWELL SF1 OFF MODE
981 02133 55FFAN053_AUH DRYWELL SF1 AUTO HMI
982 04226 55FFAN053_AUM DRYWELL SF1 AUTO MODE
983
984 10165 55FHS053B DRYWELL SF1 REMOTE D05-R01-S05-P05
985 10167 55FYS053A DRYWELL SF1 READY D05-R01-S05-P07
986
987 04222 55FFAN053_DIS DRYWELL SF1 DISABLE MODE
988 04223 55FFAN053_WAT DRYWELL SF1 WAIT
989
990 10166 55FYS053 DRYWELL SF1 ON D05-R01-S05-P06
991 04229 55FFAN053_ON DRYWELL SF1 ON
992
993 00116 55FFAN053 DRYWELL SF1 RUN D06-R01-S03-P04
994
995 44145 55FFAN053_MOD DRYWELL SF1 MODE DISPLAY 0-4095 MODE
996 44144 55FFAN053_SYM DRYWELL SF1 SYMBOL DISPLAY 0-4095 SYMBOL
997
998 04230 55FFAN053_FAA DRYWELL SF1 FAIL ALARM
999 02137 55FFAN053_FAH DRYWELL SF1 FAIL ACK HMI
1000 04231 55FFAN053_FAK DRYWELL SF1 FAIL ALM ACK
1001
1002 10168 55FISH053 DRYWELL SF1 OVERLOAD D05-R01-S05-P08
1003 04232 55FFAN053_DRA DRYWELL SF1 DRIVE ALARM
1004 02138 55FFAN053_DAH DRYWELL SF1 DRIVE ACK HMI
1005 04233 55FFAN053_DRK DRYWELL SF1 DRIVE ALM ACK
1006
1007 04235 55FFAN053_COK DRYWELL SF1 COMMON ALM ACK
1008 04234 55FFAN053_COA DRYWELL SF1 COMMON ALARM
1009 02136 55FFAN053_ALR DRYWELL SF1 ALARM RESET HMI
1010
1011 44148 55FYS053_RTC DRYWELL SF1 RUNTME CURR DAY 0-999.9 HOURS
1012 44149 55FYS053_RTP DRYWELL SF1 RUNTME PREV DAY 0-999.9 HOURS
1013 44147 55FYS053_RTL DRYWELL SF1 RUNTME CUMM LSD 0-999.9 HOURS
1014 44146 55FYS053_RTM DRYWELL SF1 RUNTME CUMM MSD 0-9999 HRS x100
1015 02139 55FYS053_RTR DRYWELL SF1 RUNTIME RESET
1016
1017 10169 55FFSL054 DRYWELL SF1 LO FLOW D05-R01-S05-P09
1018 04236 55FFSL054_ALA DRYWELL SF1 LO FLOW ALARM
1019 02140 55FFSL054_ALH DRYWELL SF1 ALARM ACK HMI
1020 04237 55FFSL054_ALK DRYWELL SF1 ALARM ACK
1021
1022 00059 55FFAL054 DRYWELL SF1 TROUBLE ALM D02-R01-S07-P11
1023
17410 Attachment - Sample Test Sheet Page 27 of 35 9/22/2020 1:05 PM
DR
A
F
T
,-
,--
,_
,--
,_
:::J
[] :::J l:::J
B :::J l:::J
C
C
9= :::J 9= n
,_
C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
1024 02144 55FFAN051_OSH DRYWELL EF1 OOS HMI
1025 04243 55FFAN051_OSM DRYWELL EF1 OOS MODE
1026 02145 55FFAN051_ISH DRYWELL EF1 INS HMI
1027 04244 55FFAN051_ISM DRYWELL EF1 INS MODE
1028
1029 02141 55FFAN051_ONH DRYWELL EF1 ON HMI
1030 04240 55FFAN051_ONM DRYWELL EF1 ON MODE
1031 02142 55FFAN051_OFH DRYWELL EF1 OFF HMI
1032 04241 55FFAN051_OFM DRYWELL EF1 OFF MODE
1033 02143 55FFAN051_AUH DRYWELL EF1 AUTO HMI
1034 04242 55FFAN051_AUM DRYWELL EF1 AUTO MODE
1035
1036 10181 55FHS051B DRYWELL EF1 REMOTE D05-R01-S06-P05
1037 10183 55FYS051A DRYWELL EF1 READY D05-R01-S06-P07
1038
1039 04238 55FFAN051_DIS DRYWELL EF1 DISABLE MODE
1040 04239 55FFAN051_WAT DRYWELL EF1 WAIT
1041
1042 10182 55FYS051 DRYWELL EF1 ON D05-R01-S06-P06
1043 04245 55FFAN051_ON DRYWELL EF1 ON
1044
1045 00124 55FFAN051 DRYWELL EF1 RUN D06-R01-S04-P04
1046
1047 44151 55FFAN051_MOD DRYWELL EF1 MODE DISPLAY 0-4095 MODE
1048 44150 55FFAN051_SYM DRYWELL EF1 SYMBOL DISPLAY 0-4095 SYMBOL
1049
1050 04246 55FFAN051_FAA DRYWELL EF1 FAIL ALARM
1051 02147 55FFAN051_FAH DRYWELL EF1 FAIL ACK HMI
1052 04247 55FFAN051_FAK DRYWELL EF1 FAIL ALM ACK
1053
1054 10184 55FISH051 DRYWELL EF1 OVERLOAD D05-R01-S06-P08
1055 04248 55FFAN051_DRA DRYWELL EF1 DRIVE ALARM
1056 02148 55FFAN051_DAH DRYWELL EF1 DRIVE ACK HMI
1057 04249 55FFAN051_DRK DRYWELL EF1 DRIVE ALM ACK
1058
1059 04250 55FFAN051_COA DRYWELL EF1 COMMON ALARM
1060 04251 55FFAN051_COK DRYWELL EF1 COMMON ALM ACK
1061 02146 55FFAN051_ALR DRYWELL EF1 ALARM RESET HMI
1062
1063 44152 55FYS051_RTM DRYWELL EF1 RUNTME CUMM MSD 0-9999 HRS x100
1064 44153 55FYS051_RTL DRYWELL EF1 RUNTME CUMM LSD 0-999.9 HOURS
1065 44154 55FYS051_RTC DRYWELL EF1 RUNTME CURR DAY 0-999.9 HOURS
1066 44155 55FYS051_RTP DRYWELL EF1 RUNTME PREV DAY 0-999.9 HOURS
1067 02149 55FYS051_RTR DRYWELL EF1 RUNTIME RESET
1068
1069 10185 55FFSL052 DRYWELL EF1 LO FLOW D05-R01-S06-P09
1070 04252 55FFSL052_ALA DRYWELL EF1 LO FLOW ALARM
1071 02150 55FFSL052_ALH DRYWELL EF1 ALARM ACK HMI
1072 04253 55FFSL052_ALK DRYWELL EF1 ALARM ACK
1073
1074 00060 55FFAL052 DRYWELL EF1 TROUBLE ALM D02-R01-S07-P12
1075
17410 Attachment - Sample Test Sheet Page 28 of 35 9/22/2020 1:05 PM
DR
A
F
T
,-
,--
,_
,--
,_
:::J
[] :::J l:::J
B :::J l:::J
C
C
9= :::J 9= n
,_
C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
1076 10197 55FASH580 DRYWELL SMOKE D05-R01-S07-P05
1077 04220 55FAAH580_ALA DRYWELL SMOKE ALARM
1078 02130 55FAAH580_ALH DRYWELL ALARM ACK HMI
1079 04221 55FAAH580_ALK DRYWELL ALARM ACK
1080 00056 55FAAH580 DRYWELL SMOKE ALM D02-R01-S07-P08
1081
1082 30031 55FAIT050 WW GAS MONITOR % LEL 0-100 %LEL D06-R01-S08-P04
1083 44156 55FAIT050_LEL WW GAS MONITOR LEL 0-100 %LEL
1084
1085 42062 55FAIT050_LLS WW GAS MONITOR LOLO LEL SET 0-100 %LEL
1086 44160 55FAIT050_LLP WW GAS MONITOR LOLO LEL SP 0-100 %LEL
1087 04262 55FAIT050_LLA WW GAS MONITOR LOLO LEL ALM
1088 02155 55FAIT050_LLH WW GAS MONITOR LOLO LEL ACKHMI
1089 04263 55FAIT050_LLK WW GAS MONITOR LOLO LEL ALMACK
1090
1091 42061 55FAIT050_LS WW GAS MONITOR LO LEL SET 0-100 %LEL
1092 44159 55FAIT050_LP WW GAS MONITOR LO LEL SP 0-100 %LEL
1093 04260 55FAIT050_LA WW GAS MONITOR LO LEL ALM
1094 02154 55FAIT050_LH WW GAS MONITOR LO LEL ACKHMI
1095 04261 55FAIT050_LK WW GAS MONITOR LO LEL ALMACK
1096
1097 42060 55FAIT050_HS WW GAS MONITOR HI LEL SET 0-100 %LEL
1098 44158 55FAIT050_HP WW GAS MONITOR HI LEL SP 0-100 %LEL
1099 04258 55FAIT050_HA WW GAS MONITOR HI LEL ALM
1100 02153 55FAIT050_HH WW GAS MONITOR HI LEL ACKHMI
1101 04259 55FAIT050_HK WW GAS MONITOR HI LEL ALMACK
1102 00048 55FAAH050 WW GAS MONITOR HI LEL ALM D02-R01-S06-P16
1103
1104 42059 55FAIT050_HHS WW GAS MONITOR HIHI LEL SET 0-100 %LEL
1105 44157 55FAIT050_HHP WW GAS MONITOR HIHI LEL SP 0-100 %LEL
1106 04256 55FAIT050_HHA WW GAS MONITOR HIHI LEL ALM
1107 02152 55FAIT050_HHH WW GAS MONITOR HIHI LEL ACKHMI
1108 04257 55FAIT050_HHK WW GAS MONITOR HIHI LEL ALMACK
1109 00047 55FAAHH050 WW GAS MONITOR HIHI LEL ALM D02-R01-S06-P15
1110
1111 04265 55FAIT050_COK WW GAS MONITOR COMMON ALM ACK
1112 04264 55FAIT050_COA WW GAS MONITOR COMMON ALARM
1113
1114 10177 55FYS050B WW GAS MONITOR XMTR TRBL D05-R01-S06-P01
1115 04254 55FYS050B_ALA WW GAS MONITOR XMTR TRBL ALM
1116 02151 55FYS050B_ALH WW GAS MONITOR ALARM ACK HMI
1117 04255 55FYS050B_ALK WW GAS MONITOR ALARM ACK
1118 00049 55FYA050B WW GAS MONITOR XMTR TRBL ALM D02-R01-S07-P01
1119
1120 00117 55FYL042 PUMP STATION ENTRY SAFE D06-R01-S03-P05
1121
17410 Attachment - Sample Test Sheet Page 29 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
C
C
9=
C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
1122 10170 55FYS160 ELEC RM ACU-1 ON D05-R01-S05-P10
1123 04266 55FYS160_ON ELEC RM ACU-1 ON
1124
1125 44161 55FYS160_RTM ELEC RM ACU-1 RUNTME CUMM MSD
1126 44162 55FYS160_RTL ELEC RM ACU-1 RUNTME CUMM LSD
1127 44163 55FYS160_RTC ELEC RM ACU-1 RUNTME CURR DAY
1128 44164 55FYS160_RTP ELEC RM ACU-1 RUNTME PREV DAY
1129 02157 55FYS160_RTR ELEC RM ACU-1 RUNTIME RESET
1130
1131 10171 55FYS160B ELEC RM ACU-1 TROUBLE D05-R01-S05-P11
1132 04267 55FYS160B_ALA ELEC RM ACU-1 TROUBLE ALARM
1133 02156 55FYS160B_ALH ELEC RM ACU-1 ALARM ACK HMI
1134 04268 55FYS160B_ALK ELEC RM ACU-1 ALARM ACK
1135
1136 10198 55FYS162 ELEC RM ACU-2 ON D05-R01-S07-P06
1137 04269 55FYS162_ON ELEC RM ACU-2 ON
1138
1139 44165 55FYS162_RTM ELEC RM ACU-2 RUNTME CUMM MSD
1140 44166 55FYS162_RTL ELEC RM ACU-2 RUNTME CUMM LSD
1141 44167 55FYS162_RTC ELEC RM ACU-2 RUNTME CURR DAY
1142 44168 55FYS162_RTP ELEC RM ACU-2 RUNTME PREV DAY
1143 02159 55FYS162_RTR ELEC RM ACU-2 RUNTIME RESET
1144
1145 10199 55FYS162B ELEC RM ACU-2 TROUBLE D05-R01-S07-P07
1146 04270 55FYS162B_ALA ELEC RM ACU-2 TROUBLE ALARM
1147 02158 55FYS162B_ALH ELEC RM ACU-2 ALARM ACK HMI
1148 04271 55FYS162B_ALK ELEC RM ACU-2 ALARM ACK
1149
1150 00058 55FYA160B ELEC RM ACU TROUBLE ALM D02-R01-S07-P10
1151
1152 10186 55FTSH064 ELEC RM HI TMP D05-R01-S06-P10
1153 04272 55FTSH064_ALA ELEC RM HI TMP ALARM
1154 02160 55FTSH064_ALH ELEC RM ALARM ACK HMI
1155 04273 55FTSH064_ALK ELEC RM ALARM ACK
1156 00057 55FTAH064 ELEC RM HI TMP ALM D02-R01-S07-P09
1157
17410 Attachment - Sample Test Sheet Page 30 of 35 9/22/2020 1:05 PM
DR
A
F
T
[] []
,_
C
[] []
,_
C
C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
1158 10174 55FZSC126 CKT BKR UTIL CLOSED D05-R01-S05-P14
1159 04274 55FZSC126_STA CKT BKR UTIL CLOSED
1160
1161 10190 55FZSC126A CKT BKR MAIN CLOSED D05-R01-S06-P14
1162 04275 55FZSC126A_STA CKT BKR MAIN CLOSED
1163
1164 10175 55FZSC129 CKT BKR MCC A CLOSED D05-R01-S05-P15
1165 04276 55FZSC129_STA CKT BKR MCC A CLOSED
1166
1167 10191 55FZSC130 CKT BKR MCC B CLOSED D05-R01-S06-P15
1168 04277 55FZSC130_STA CKT BKR MCC B CLOSED
1169
1170 10194 55FHS126B ATS AUTO D05-R01-S07-P02
1171 04302 55FHS126B_STA ATS AUTO
1172
1173 10195 55FYS126B ATS STANDBY D05-R01-S07-P03
1174 04303 55FYS126B_STA ATS STANDBY
1175
1176 10196 55FESL126 ATS BUS DPN-A UNDER VOLT D05-R01-S07-P04
1177 04304 55FESL126_ALA ATS BUS DPN-A UNDER VOLT ALM
1178 02173 55FESL126_ALH ATS BUS DPN-A ALARM ACK HMI
1179 04305 55FESL126_ALK ATS BUS DPN-A ALARM ACK
1180
1181 10187 55FYS060J UPS BYPASS ON D05-R01-S06-P11
1182 00067 55FYA060J UPS BYPASS ON ALM D02-R01-S08-P03
1183 04280 55FYS060J_ALA UPS BYPASS ON ALARM
1184 02162 55FYS060J_ALH UPS BYPASS ALARM ACK HMI
1185 04281 55FYS060J_ALK UPS BYPASS ALARM ACK
1186
1187 10188 55FJSL060J UPS AC LINE TROUBLE D05-R01-S06-P12
1188 04278 55FJSL060J_ALA UPS AC LINE TROUBLE ALARM
1189 02161 55FJSL060J_ALH UPS AC LINE ALARM ACK HMI
1190 04279 55FJSL060J_ALK UPS AC LINE ALARM ACK
1191
1192 10173 55FYS060B UPS INVERTER TROUBLE D05-R01-S05-P13
1193 00068 55FYA060B UPS TROUBLE ALM D02-R01-S08-P04
1194 04282 55FYS060B_ALA UPS INVERTER TROUBLE ALARM
1195 02163 55FYS060B_ALH UPS INVERTER ALARM ACK HMI
1196 04283 55FYS060B_ALK UPS INVERTER ALARM ACK
1197
1198 10189 55FESL060 UPS BATTERY LOW D05-R01-S06-P13
1199 00069 55FEAL060 UPS BATTERY LOW ALM D02-R01-S08-P05
1200 04284 55FESL060_ALA UPS BATTERY LO ALARM
1201 02164 55FESL060_ALH UPS BATTERY ALARM ACK HMI
1202 04285 55FESL060_ALK UPS BATTERY ALARM ACK
1203
17410 Attachment - Sample Test Sheet Page 31 of 35 9/22/2020 1:05 PM
DR
A
F
T
[]
[]
[]
[]
[]
[]
C
C
C
C
C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
1204 10011 55FJSL068 INST PWR LCP TROUBLE D02-R01-S03-P11
1205 04286 55FJSL068_ALA INST PWR LCP TROUBLE ALARM
1206 02165 55FJSL068_ALH INST PWR LCP ALARM ACK HMI
1207 04287 55FJSL068_ALK INST PWR LCP ALARM ACK
1208 00072 55FJAL068 INST PWR LCP TROUBLE ALM D02-R01-S08-P08
1209
1210 10085 55FJSL068A INST PWR RIO A TROUBLE D03-R01-S07-P05
1211 04288 55FJSL068A_ALA INST PWR RIO A TROUBLE ALARM
1212 02166 55FJSL068A_ALH INST PWR RIO A ALARM ACK HMI
1213 04289 55FJSL068A_ALK INST PWR RIO A ALARM ACK
1214 00073 55FJAL068A INST PWR RIO A TROUBLE ALM D02-R01-S08-P09
1215
1216 10172 55FJSL068B INST PWR RIO B TROUBLE D05-R01-S05-P12
1217 04290 55FJSL068B_ALA INST PWR RIO B TROUBLE ALARM
1218 02167 55FJSL068B_ALH INST PWR RIO B ALARM ACK HMI
1219 04291 55FJSL068B_ALK INST PWR RIO B ALARM ACK
1220 00074 55FJAL068B INST PWR RIO B TROUBLE ALM D02-R01-S08-P10
1221
1222 10225 55FTSH084 GEN RM HI TMP D05-R01-S09-P01
1223 04306 55FTSH084_ALA GEN RM HI TMP ALARM
1224 02174 55FTSH084_ALH GEN RM ALARM ACK HMI
1225 04307 55FTSH084_ALK GEN RM ALARM ACK
1226 00066 55FTAH084 GEN RM HI TMP ALM D02-R01-S08-P02
1227
1228 10227 55FISH084 GEN RM EF3 OVERLOAD D05-R01-S09-P03
1229 04309 55FISH084_ALA GEN RM EF3 OVERLOAD ALARM
1230 02176 55FISH084_ALH GEN RM EF3 ALARM ACK HMI
1231 04310 55FISH084_ALK GEN RM EF3 ALARM ACK
1232 00061 55FYA084B GEN RM EF3 TROUBLE ALM D02-R01-S07-P13
1233
1234 10226 55FYS084 GEN RM EF3 ON D05-R01-S09-P02
1235 04308 55FYS084_ON GEN RM EF3 ON
1236 44169 55FYS084_SYM GEN RM EF3 SYMBOL DISPLAY
1237
1238 44170 55FYS084_RTM GEN RM EF3 RUNTME CUMM MSD
1239 44171 55FYS084_RTL GEN RM EF3 RUNTME CUMM LSD
1240 44172 55FYS084_RTC GEN RM EF3 RUNTME CURR DAY
1241 44173 55FYS084_RTP GEN RM EF3 RUNTME PREV DAY
1242 02175 55FYS084_RTR GEN RM EF3 RUNTIME RESET
1243
17410 Attachment - Sample Test Sheet Page 32 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
C
C
C
C
B
,_
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
1244 10213 55FHS080B GEN AUTO D05-R01-S08-P05
1245 04311 55FHS080B_STA GEN AUTO
1246
1247 10212 55FYS087 GEN ENG ON D05-R01-S08-P04
1248 04312 55FYS087_ON GEN ENG ON
1249
1250 44176 55FYS087_RTC GEN ENG RUNTME CURR DAY
1251 44175 55FYS087_RTL GEN ENG RUNTME CUMM LSD
1252 44174 55FYS087_RTM GEN ENG RUNTME CUMM MSD
1253 44177 55FYS087_RTP GEN ENG RUNTME PREV DAY
1254 02177 55FYS087_RTR GEN ENG RUNTIME RESET
1255
1256 10214 55FYS087K GEN ENG OVERCRANK D05-R01-S08-P06
1257 04313 55FYS087K_ALA GEN ENG OVERCRANK ALARM
1258 02178 55FYS087K_ALH GEN ENG ALARM ACK HMI
1259 04314 55FYS087K_ALK GEN ENG ALARM ACK
1260
1261 10215 55FYS080K GEN COM SHUTDN D05-R01-S08-P07
1262 04315 55FYS080K_ALA GEN COM SHUTDN ALM
1263 02179 55FYS080K_ALH GEN ALARM ACK HMI
1264 04316 55FYS080K_ALK GEN ALARM ACK
1265 00064 55FYA080B GEN TROUBLE ALM D02-R01-S07-P16
1266
1267 10216 55FYS087B GEN MECH TROUBLE D05-R01-S08-P08
1268 04317 55FYS087B_ALA GEN MECH TROUBLE ALM
1269 02180 55FYS087B_ALH GEN MECH ALARM ACK HMI
1270 04318 55FYS087B_ALK GEN MECH ALARM ACK
1271
1272 10217 55FTSH181 GEN STATOR HI TMP D05-R01-S08-P09
1273 04319 55FTSH181_ALA GEN STATOR HI TMP ALARM
1274 02181 55FTSH181_ALH GEN STATOR ALARM ACK HMI
1275 04320 55FTSH181_ALK GEN STATOR ALARM ACK
1276
1277 10218 55FZSC080A GEN CKT BKR CLOSED D05-R01-S08-P10
1278 04321 55FZSC080A_STA GEN CKT BKR CLOSED
1279
1280 10219 55FISH080A GEN CKT BKR TRIPPED D05-R01-S08-P11
1281 04322 55FISH080A_ALA GEN CKT BKR TRIPPED ALARM
1282 02182 55FISH080A_ALH GEN CKT BKR ALARM ACK HMI
1283 04323 55FISH080A_ALK GEN CKT BKR ALARM ACK
1284
1285 10209 55FLSH091 GEN TANK LEAK D05-R01-S08-P01
1286 04324 55FLSH091_ALA GEN TANK LEAK ALARM
1287 02183 55FLSH091_ALH GEN TANK ALARM ACK HMI
1288 04325 55FLSH091_ALK GEN TANK ALARM ACK
1289
1290 10210 55FESL083 GEN BATT LO VOLT D05-R01-S08-P02
1291 04326 55FESL083_ALA GEN BATT LO VOLT ALARM
1292 02184 55FESL083_ALH GEN BATT ALARM ACK HMI
1293 04327 55FESL083_ALK GEN BATT ALARM ACK
1294
17410 Attachment - Sample Test Sheet Page 33 of 35 9/22/2020 1:05 PM
DR
A
F
T
[]
[]
,_
C
C
C
C
C
C
C
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
1295 10211 55FYS083B GEN BATT CHRG TROUBLE D05-R01-S08-P03
1296 04328 55FYS083B_ALA GEN BATT CHRG TROUBLE ALARM
1297 02185 55FYS083B_ALH GEN BATT CHRG ALARM ACK HMI
1298 04329 55FYS083B_ALK GEN BATT CHRG ALARM ACK
1299
1300 04330 55FGEN080_COA GEN COMMON ALARM
1301 04331 55FGEN080_COK GEN COMMON ALM ACK
1302
1303 04387 55FGEN080_ALM GEN COMM FAIL ALARM
1304
1305 30020 55FIT080A GEN PHASE A AMPS D06-R01-S07-P02
1306 44178 55FIT080A_CUR GEN PHASE A AMPS
1307 30030 55FIT080B GEN PHASE B AMPS D06-R01-S08-P03
1308 44179 55FIT080B_CUR GEN PHASE A AMPS
1309 30021 55FIT080C GEN PHASE C AMPS D06-R01-S07-P03
1310 44180 55FIT080C_CUR GEN PHASE A AMPS
1311
1312 30029 55FLIT090 GEN TANK LEVEL D06-R01-S08-P02
1313 44181 55FLIT090_LVL GEN TANK LEVEL
1314 40022 55FLI090 GEN TANK LEVEL D06-R01-S09-P02
1315
1316 42063 55FLIT090_HHS GEN TANK HIHI LVL SET
1317 44182 55FLIT090_HHP GEN TANK HIHI LVL SP
1318 04332 55FLIT090_HHA GEN TANK HIHI LVL ALM
1319 02186 55FLIT090_HHH GEN TANK HIHI LVL ACKHMI
1320 04333 55FLIT090_HHK GEN TANK HIHI LVL ALMACK
1321
1322 42064 55FLIT090_HS GEN TANK HI LVL SET
1323 44183 55FLIT090_HP GEN TANK HI LVL SP
1324 04334 55FLIT090_HA GEN TANK HI LEVEL ALM
1325 02187 55FLIT090_HH GEN TANK HI LVL ACKHMI
1326 04335 55FLIT090_HK GEN TANK HI LVL ALMACK
1327 00062 55FLAH090 GEN TANK HI LEVEL ALM D02-R01-S07-P14
1328 00118 55FLAH090A GEN TANK HI LEVEL ALM D06-R01-S03-P06
1329
1330 42065 55FLIT090_LS GEN TANK LO LVL SET
1331 44184 55FLIT090_LP GEN TANK LO LVL SP
1332 04336 55FLIT090_LA GEN TANK LO LVL ALM
1333 02188 55FLIT090_LH GEN TANK LO LVL ACKHMI
1334 04337 55FLIT090_LK GEN TANK LO LVL ALMACK
1335 00063 55FLAL090 GEN TANK LO LEVEL ALM D02-R01-S07-P15
1336
1337 42066 55FLIT090_LLS GEN TANK LOLO LVL SET
1338 44185 55FLIT090_LLP GEN TANK LOLO LVL SP
1339 04338 55FLIT090_LLA GEN TANK LOLO LVL ALM
1340 02189 55FLIT090_LLH GEN TANK LOLO LVL ACKHMI
1341 04339 55FLIT090_LLK GEN TANK LOLO LVL ALMACK
1342
1343 04340 55FLIT090_COA GEN TANK COMMON ALARM
1344 04341 55FLIT090_COK GEN TANK COMMON ALM ACK
1345
17410 Attachment - Sample Test Sheet Page 34 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
C
C
n
Job No. 4xxxxxx (J-xxx Job Name)TEST SIGN-OFF SHEETS Project Name
REAL I/O
= NOT APPLICABLE
ITEM REGISTER TAG DESCRIPTION Range AL
A
R
M
S
U
M
M
A
R
Y
0%
o
r
O
N
50
%
10
0
%
DROP-RACK-
SLOT-POINT 0%
o
r
P
a
n
e
l
O
N
50
%
o
r
A
n
n
.
B
L
I
N
K
10
0
%
o
r
A
n
n
.
O
N
0%
o
r
O
N
50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
0%50
%
10
0
%
0%50
%
10
0
%
0%
o
r
O
N
50
%
o
r
A
L
M
B
l
i
n
k
10
0
%
o
r
A
L
M
S
o
l
i
d
COMMENT SIGN-OFF
FIELD
PUMPS
GROUP A/M
PROCESS
OVERVIEW
INPUT OUTPUT
LCP LCPA\FIELD
RUNTIME
OR SUM.
CONFIG TRENDPUMP #PUMP/VLV
DETAIL TUNING
PUMP # /
VLV A/M
1346 10193 55FJSL039 PUMP STATION POWER FAIL D05-R01-S07-P01
1347 04292 55FJSL039_ALA PUMP STATION POWER FAIL ALM
1348 02168 55FJSL039_ALH PUMP STATION ALARM ACK HMI
1349 04293 55FJSL039_ALK PUMP STATION ALARM ACK
1350
1351 04382 55FPMON039_ALM POWER MONITOR COMM FAIL ALARM
1352
1353 44187 55FEIT039_VLT POWER MONITOR VOLTS
1354 44188 55FIIT039_AMP POWER MONITOR AMPS
1355 44189 55FJIT039_KW POWER MONITOR KILOWATTS
1356 44190 55FQJIT039_KWM POWER MONITOR KILOWATT-HR MSD
1357 44191 55FQJIT039_KWL POWER MONITOR KILOWATT-HR LSD
1358 44192 55FQJIT039A_KVM POWER MONITOR KILOVAR-HR MSD
1359 44193 55FQJIT039A_KVL POWER MONITOR KILOVAR-HR LSD
1360
1361 10086 55FZSC062 ELECTRIC RM INTRUSION D03-R01-S07-P06
1362 04294 55FZSC062_ALA ELECTRIC RM INTRUSION ALARM
1363 02169 55FZSC062_ALH ELECTRIC RM ALARM ACK HMI
1364 04295 55FZSC062_ALK ELECTRIC RM ALARM ACK
1365
1366 10087 55FZSC062A DRYWELL INTRUSION D03-R01-S07-P07
1367 04296 55FZSC062A_ALA DRYWELL INTRUSION ALARM
1368 02170 55FZSC062A_ALH DRYWELL ALARM ACK HMI
1369 04297 55FZSC062A_ALK DRYWELL ALARM ACK
1370 00070 55FZA062A DRYWELL INTRUSION ALM D02-R01-S08-P06
1371
1372 10088 55FZSC062C GEN RM INTRUSION D03-R01-S07-P08
1373 04298 55FZSC062C_ALA GEN RM INTRUSION ALARM
1374 02171 55FZSC062C_ALH GEN RM ALARM ACK HMI
1375 04299 55FZSC062C_ALK GEN RM ALARM ACK
1376 00065 55FZA062C GEN BUILDING INTRUSION ALM D02-R01-S08-P01
1377
1378 10089 55FZSC062B EXTERNL PANELS INTRUSION D03-R01-S07-P09
1379 04300 55FZSC062B_ALA EXTERNL PANELS INTRUSION ALARM
1380 02172 55FZSC062B_ALH EXTERNL PANELS ALARM ACK HMI
1381 04301 55FZSC062B_ALK EXTERNL PANELS ALARM ACK
1382 00071 55FZA062B EXTERNL PANELS INTRUSION ALM D02-R01-S08-P07
1383
1384 10001 55FHS037J LCP PANEL LAMP TEST D02-R01-S03-P01
1385
1386 00076 55FYA079B PLC TROUBLE ALM D02-R01-S08-P12
1387
1388 44186 55FU079_STA PUMP STATION STATUS
1389
17410 Attachment - Sample Test Sheet Page 35 of 35 9/22/2020 1:05 PM
DR
A
F
T
C
C
C
C
C
C
[]
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
1 SWS-C08 DIAGNOSTICS TEMPLATE LOGIC(SWS-C08 V2.41)10EU079 02001 04001 06001 42001 44001 46001
2 CUSTOM CUSTOM LOGIC - LOCAL PANEL INPUTS TEST PUSH BUTTON
Combine the test push button with an off delay timer so that the test
logic remains on for a hard coded time delay once the Operator
releases the button. This coil is connected to each of the panel and
annunciator lights to allow the operator to activate all PLC controlled
lights on the FCP panel by pressing the test push button.10254 10EHS037J DIV FCP PANEL 07001 47001
DIVERSION BOX LEVELS, FLOWS AND POWER LOSS
3 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Ultrasonic Fail 10241 10EYS672B DIV BOX SONIC 02021 04021 47002
4 SWS-C12A TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12A V1.30)
Diversion Box Ultrasonic Level, use Ultrasonic Fail alarm for external
alarm input.30037 10ELIT672 DIV BOX SONIC 02022 04023 07003 42021 44021 47003
5 CUSTOM CUSTOM LOGIC - KNOTT VALVE POSITIONS FOR HOURS 0 - 15
Block move operator entered setpoints for Knott Valve positions from
HMI input to output for hours 0 to 15.10EVB671 DIV KNOT VLV 42025 44026
6 CUSTOM CUSTOM LOGIC - KNOTT VALVE POSITIONS FOR HOURS 16 - 23
Block move operator entered setpoints for Knott Valve positions from
HMI input to output for hours 16 to 23.10EVB671 DIV KNOT VLV 42041 44042
7 CUSTOM CUSTOM LOGIC - KNOTT TABLE TO REGISTER MOVE FOR AUTOMATIC CTRL
Copy hour from time of day clock to Table to Register Move index
register. Table to register move which transfers valve position to
output register based on hour time of day (0 - 23) with top and middle
inputs tied to power so instruction doesn't increment itself (change in
hours moves pointer).10EVB671 DIV KNOT VLV 07008 47018
8 SWS-C15A AUTO/MANUAL STATION TEMPLATE LOGIC(SWS-C15A V1.01)Knott Valve 10EVA671 DIV KNOT VLV 02026 04033 07010 42049 44050 47020
9 SWS-C06B VALVE CONTROL, MODULATING TEMPLATE LOGIC(SWS-C06B V2.01)
Knott Valve, modify so that loss of power (latched trouble alarm) does
not close valve. Change Wait Mode BLKM so that Position Buffer is
feed back into itself instead of a value of 0.40019 10EFV671 DIV KNOT VLV 02028 04035 07012 44052 47021
10 CUSTOM CUSTOM LOGIC - BUSHARD VALVE POSITIONS FOR HOURS 0 - 16
Block move operator entered setpoints for Bushard Valve positions
from HMI input to output for hours 0 to 16.10EVB676 DIV BUSH VLV 42050 44055
11 CUSTOM CUSTOM LOGIC - BUSHARD VALVE POSITIONS FOR HOURS 17 - 23
Block move operator entered setpoints for Bushard Valve positions
from HMI input to output for hours 17 to 23.10EVB676 DIV BUSH VLV 42066 44071
12 CUSTOM CUSTOM LOGIC - BUSHARD TABLE TO REGISTER MOVE TO AUTOMATIC CTRL
Copy hour from time of day clock to Table to Register Move index
register. Table to register move which transfers valve position to
output register based on hour time of day (0 - 23) with top and middle
inputs tied to power so instruction doesn't increment itself (change in
hours moves pointer).10EVB676 DIV BUSH VLV 07017 47042
13 SWS-C15A AUTO/MANUAL STATION TEMPLATE LOGIC(SWS-C15A V1.01)Bushard Valve 10EVA676 DIV BUSH VLV 02033 04046 07019 42074 44079 47044
14 SWS-C06B VALVE CONTROL, MODULATING TEMPLATE LOGIC(SWS-C06B V2.01)
Bushard Valve, modify so that loss of power (latched trouble alarm)
does not close valve. Change Wait Mode BLKM so that Position Buffer
is feed back into itself instead of a value of 0.40021 10EFV676 DIV BUSH VLV 02035 04048 07021 44081 47045
15 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Knott 1 Flow Transmitter Trouble, inhibit if Knott Valve is not open.10246 10EYS674B DIV KNOT 1 FLO 02040 04059 47066
16 SWS-C12A TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12A V1.30)
Knott 1 Flowmeter, inhibit Low and Low Low flow alarms when Knott
Vavle is closed, use Tranmsitter Trouble Alarm for external alarm input. 30040 10EFIT674 DIV KNOT 1 02041 04061 07026 42075 44084 47067
17 SWS-C19 TOTALIZER TEMPLATE LOGIC(SWS-C19 V1.11)Knott 1 Flowmeter, inhibit when Knott Valve is not open.30040 10EFIT674 DIV KNOT 1 07031 44089 47082
18 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Knott 1 Level (from Flow Meter).30041 10ELIT674 DIV KNOT 1 44099 47108
19 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Knott 1 Velocity (from Flow Meter).30042 10ESIT674 DIV KNOT 1 44100 47115
20 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Knott 2 Flow Transmitter Trouble, inhibit if Knott Valve is not open 10261 10EYS675B DIV KNOT 2 FLO 02045 04071 47122
21 SWS-C12A TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12A V1.30)
Knott 2 Flowmeter, inhibit Low and Low Low flow alarms when Knott
Vavle is closed, use Tranmsitter Trouble Alarm for external alarm input. 30049 10EFIT675 DIV KNOT 2 02046 04073 07032 42079 44101 47123
22 SWS-C19 TOTALIZER TEMPLATE LOGIC(SWS-C19 V1.11)Knott 2 Flowmeter, inhibit when Knott Valve is not open.30049 10EFIT675 DIV KNOT 2 07037 44106 47138
23 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Knott 2 Level (from Flow Meter).30050 10ELIT675 DIV KNOT 2 44116 47164
24 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Knott 2 Velocity (from Flow Meter).30052 10ESIT675 DIV KNOT 2 44117 47171
25 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Bushard Flow Transmitter Trouble, inhibit if Bushard Valve is not open.10260 10EYS673B DIV BUSH FLO 02050 04083 47178
26 SWS-C12A TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12A V1.30)
Bushard Flowmeter, inhibit Low and Low Low flow alarms when
Bushard Vavle is closed, use Tranmsitter Trouble Alarm for external
alarm input.30047 10EFIT673 DIV BUSH 02051 04085 07038 42083 44118 47179
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
17410 Attachment D - Sample Program Flowchart Page 1 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
27 SWS-C19 TOTALIZER TEMPLATE LOGIC(SWS-C19 V1.11)Bushard Flowmeter, inhibit when Bushard Valve is not open.30047 10EFIT673 DIV BUSH 07043 44123 47194
28 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Bushard Level (from Flow Meter).30048 10ELIT673 DIV BUSH 44133 47220
29 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Bushard Velocity (from Flow Meter).30051 10ESIT673 DIV BUSH 44134 47227
DIVERSION BOX CONTROLS
30 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Gas Monitor Trouble Alarm 10242 10EYS677B DIV BOX GAS 02055 04095 47234
31 SWS-C12A TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12A V1.30)
Diversion Box Gas Monitor Level inhibit Hi and HiHi when Trouble
Alarm is active and deactivate Lo and LoLo Alarms, use Transmitter
Trouble Alarm for external alarm input.30038 10EAIT677 DIV BOX GAS 02056 04097 07044 42087 44135 47235
32 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Electrical Room Hi Sump Level 10247 10ELSH684 DIV SUMP 02060 04107 47250
33 CUSTOM CUSTOM LOGIC - SUPPLY FAN ON TO HMI Diversion Box Electrical Room Suppy Fan, send On signal to HMI.10248 10EYS691 DIV SF1 04109
34 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Diversion Box Electrical Room Supply Fan Runtime 10248 10EYS691 DIV SF1 02061 07049 44140 47251
35 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Electrical Room Supply Fan Overload 10249 10EISH691 DIV SF1 02061 04110 47251
36 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Diversion Box Electrical Room Supply Fan Low Flow, inhibit when
Supply Fan is not On.10250 10EFSL692 DIV SF1 02062 04112 47252
37 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Electrical Room UPS Trouble 10252 10EYS678B DIV UPS 02063 04114 47253
38 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Electrical Room UPS AC Fail 10262 10EJSL678 DIV UPS AC 02064 04116 47254
39 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Electrical Room UPS Bypass Alarm 10263 10EYS678J DIV UPS BYPASS 02065 04118 47255
40 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Electrical Room UPS Low Battery 10264 10EESL678 DIV UPS BATT 02066 04120 47256
41 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Diversion Box Electrical Room LCP Panel Instrument Power Supply
Trouble 10265 10EJSL687 DIV INST POWER 02067 04122 47257
42 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Electrical Room Power Fail 10253 10EYS695 DIV 02068 04124 47258
43 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Diversion Box Electrical Room Intrusion 10251 10EZSC686 DIV ELEC RM 02069 04126 47259
44 CUSTOM CUSTOM LOGIC - DIV KNOTT VLV AND KNOTT 1 FLO XMTR ANNUNCIATOR ALM
Diversion Box Knott Valve Trouble Alarm output to annunciator.
Note: All Alarms going to the annunciator are setup so that the Alarm
contact is in series with the 1 second toggle coil causing the alarm to
blink, then in parallel connect the acknowledge with no toggle so the
output stays on until the acknowledge clears and in parallel with the
alarm and acknoledge connect the lamp test contact.49 10EYA671B DIV KNOT VLV
45 CUSTOM CUSTOM LOGIC - DIV KNOTT VLV AND KNOTT 1 FLO XMTR ANNUNCIATOR ALM
Diversion Box Knott 1 Flow XMTR Trouble Alarm output to
annunciator.50 10EYA674B DIV KNOT 1 FLO
46 CUSTOM CUSTOM LOGIC - DIV KNOTT 2 FLO XMTR AND PLC TRBL ANNUNCIATOR ALM
Diversion Box Knott 2 Flow XMTR Trouble Alarm output to
annunciator.51 10EYA675B DIV KNOT 2 FLO
47 CUSTOM CUSTOM LOGIC - DIV KNOTT 2 FLO XMTR AND PLC TRBL ANNUNCIATOR ALM
Diversion Box PLC Trouble Alarm output to annunciator. Sum up, PLC
Battery Fail, Memory Protect Off, PLC All Modules Not Healthy, PLC
Drops Not Communicating, PLC Hot Standby Problem, PLC Controller
B Primary, PLC Controller Logic Mis-match. Output is energized for
normal condition, so series all contacts using normally closed contacts.
Lamp Test is in series instead of parallel.52 10EYA079 PLC
48 CUSTOM CUSTOM LOGIC - DIV BUSHARD VALVE AND FLOW XMTR ANNUNCIATOR ALARM Diversion Box Bushard Valve Trouble Alarm output to annunciator.53 10EYA676B DIV BUSH VLV
49 CUSTOM CUSTOM LOGIC - DIV BUSHARD VALVE AND FLOW XMTR ANNUNCIATOR ALARM
Diversion Box Bushard Flow XMTR Trouble Alarm output to
annunciator.54 10EYA673B DIV BUSH FLO
50 CUSTOM CUSTOM LOGIC - SONIC HI AND HIHI LEVEL COMMON ALARM
Diversion Box Sonic HI and HI HI Level Alarms are summed together
to produce a common alarm signal for the HI and HI HI.10ELIT672 DIV BOX SONIC 07050
51 CUSTOM CUSTOM LOGIC - DIV BOX SONIC HI LEVEL AND XMTR ANNUNCIATOR ALARM Diversion Box Sonic High Level Common Alarm output to annunciator.55 10ELAH672 DIV BOX SONIC
52 CUSTOM CUSTOM LOGIC - DIV BOX SONIC HI LEVEL AND XMTR ANNUNCIATOR ALARM Diversion Box Sonic XMTR Trouble Alarm output to annunciator.56 10EYA672B DIV BOX SONIC
53 CUSTOM CUSTOM LOGIC - DIV BOX GAS HIHI AND HI ANNUNCIATOR ALARM Diversion Box Gas Transmitter HI HI LEL Alarm output to annunciator.57 10EAAHH677 DIV BOX GAS
54 CUSTOM CUSTOM LOGIC - DIV BOX GAS HIHI AND HI ANNUNCIATOR ALARM Diversion Box Gas Transmitter HI LEL Alarm output to annunciator.58 10EAAH677 DIV BOX GAS
55 CUSTOM CUSTOM LOGIC - DIV BOX GAS XMTR TRBL AND HI SUMP ANNUNCIATOR ALM Diversion Box Gas XMTR Trouble Alarm output to annunciator.59 10EYA677B DIV BOX GAS
56 CUSTOM CUSTOM LOGIC - DIV BOX GAS XMTR TRBL AND HI SUMP ANNUNCIATOR ALM Diversion Box HI Sump Level Alarm output to annunciator.60 10ELAH684 DIV SUMP
57 CUSTOM CUSTOM LOGIC - DIV BOX UPS BYPASS ON AND TROUBLE ANNUNCIATOR ALM Diversion Box UPS Bypass On Alarm output to annunciator.61 10EYA678J DIV UPS BYPASS
58 CUSTOM CUSTOM LOGIC - DIV BOX UPS BYPASS ON AND TROUBLE ANNUNCIATOR ALM Diversion Box UPS Trouble Alarm output to annunciator.62 10EYA678B DIV UPS
59 CUSTOM CUSTOM LOGIC - DIV UPS BATT LO AND INST PWR FAIL ANNUNCIATOR ALM Diversion Box UPS Battery LO Alarm output to annunciator.63 10EEAL678 DIV UPS BATT
60 CUSTOM CUSTOM LOGIC - DIV UPS BATT LO AND INST PWR FAIL ANNUNCIATOR ALM Diversion Box Instrumenation Power Fail Alarm output to annunciator.64 10EJAL687 DIV INST POWER
17410 Attachment D - Sample Program Flowchart Page 2 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
61 CUSTOM CUSTOM LOGIC - DIV BOX SONIC LEVEL DISPLAY
Diversion Box Sonic Level display, move analog input signal to analog
output register for display on panel front analog display.
Note: For all front panel displays move input to output until the Lamp
Test button is pressed, when the Lamp Test is pressed suspend
moving the analog input to the analog output and instead alternate the
display every 2 seconds, using the 2 second toggle contact, between 0
and 4095.40017 10ELI672 DIV BOX SONIC
62 CUSTOM CUSTOM LOGIC - DIV BOX GAS LEL DISPLAY
Diversion Box Gas Monitor LEL Level display, move analog input signal
to analog output register for display on panel front analog display. 40018 10EAI677 DIV BOX GAS
63 CUSTOM CUSTOM LOGIC - DIV BOX KNOTT VALVE POSITION DISPLAY
Diversion Box Knott Valve Position display, move analog input signal to
analog output register for display on panel front analog display.40020 10EZI671 DIV KNOT VLV
64 CUSTOM CUSTOM LOGIC - DIV BOX BUSHARD VALVE POSITION DISPLAY
Diversion Box Bushard Valve Position display, move analog input
signal to analog output register for display on panel front analog
display.40022 10EZI676 DIV BUSH VLV
65 CUSTOM CUSTOM LOGIC - DIV BOX KNOTT 1 FLOW DISPLAY
Diversion Box Knott 1 Flow Meter Flow display, move analog input
signal to analog output register for display on panel front analog display
when flow meter Flow Total coil is enabled, when coil is off move a
value of 0 to the display.40023 10EFI674 DIV KNOT 1
66 CUSTOM CUSTOM LOGIC - DIV BOX KNOTT 1 LEVEL DISPLAY
Diversion Box Knott 1 Flow Meter Level display, move analog input
signal to analog output register for display on panel front analog
display.40024 10ELI674 DIV KNOT 1
67 CUSTOM CUSTOM LOGIC - DIV BOX BUSHARD FLOW DISPLAY
Diversion Box Bushard Flow Meter Flow display, move analog input
signal to analog output register for display on panel front analog display
when flow meter Flow Total coil is enabled, when coil is off move a
value of 0 to the display.40025 10EFI673 DIV BUSH
68 CUSTOM CUSTOM LOGIC - DIV BOX BUSHARD LEVEL DISPLAY
Diversion Box Bushard Flow Meter Level display, move analog input
signal to analog output register for display on panel front analog
display.40026 10ELI673 DIV BUSH
69 CUSTOM CUSTOM LOGIC - DIV BOX KNOTT 2 FLOW DISPLAY
Diversion Box Knott 2 Flow Meter Flow display, move analog input
signal to analog output register for display on panel front analog display
when flow meter Flow Total coil is enabled, when coil is off move a
value of 0 to the display.40027 10EFI675 DIV KNOT 2
70 CUSTOM CUSTOM LOGIC - DIV BOX KNOTT 2 LEVEL DISPLAY
Diversion Box Knott 2 Flow Meter Level display, move analog input
signal to analog output register for display on panel front analog
display.40028 10ELI675 DIV KNOT 2
PUMP STATION PUMP CONTROLS
71 CUSTOM CUSTOM LOGIC - LOCAL PANEL INPUTS CLEANING PANEL ACTIVATE
If the internal cleaning cycle disable is off and the operator pushes the
Cleaning Panel Activate push button on the LCP panel, then seal-in the
logic until the cleaning cycle is completed. The cleaning cycle is
completed when the internal end cycle coil turns on. The cleaning
cycle will abort and end prematurely if the internal cleaning cycle
disable coil subsequently turns on.10065 10EHS560J CLEANING LCP
72 CUSTOM CUSTOM LOGIC - LOCAL PANEL INPUTS PUMPS RESET
Combine each of the VFD mounted reset pushbuttons for pumps 1 and
2 with the individual CRISP A/M station resets using internal coils
which will be fed into the three SWS-C02s to reset the logic for each
pump.10021 10EHS100H PUMP 1
73 CUSTOM CUSTOM LOGIC - LOCAL PANEL INPUTS PUMPS RESET
Combine each of the VFD mounted reset pushbuttons for pumps 3 and
4 with the individual CRISP A/M station resets using internal coils
which will be fed into the three SWS-C02s to reset the logic for each
pump.10149 10EHS300H PUMP 3
17410 Attachment D - Sample Program Flowchart Page 3 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
74 CUSTOM CUSTOM LOGIC - PANEL LCP-A PUMPS SPEED UP/DOWN PUSHBUTTON
The Pumps Speed Up and Down push buttons and logic are only
enabled once the Operator presses the Start Cleaning Cycle Push
button. Once enabled combine the Pump 1 Speed Up and Down push
buttons from LCP-A with timer circuits so that one press of the button
results in a single pulse of the internal speed up or down coil, while
holding the button causes the coil to pulse repeatedly after a short time
delay.10132 10EHS560N PUMPS LCPA
75 CUSTOM CUSTOM LOGIC - PANEL LCP-A PREPARE CLEANING CYCLE PUSHBUTTON
If the Operator has enabled the cleaning cycle at the LCP panel and
then presses the Prepare to Clean push button on the LCP-A panel,
then seal-in the logic until the cleaning cycle ends. The Prepare to
Clean logic causes control to transfer from the normal wetwell level
control PID to manual pump speed control. It also results in any
wetwell level alarms being disabled.10129 10EHS560K CLEANING LCPA
76 CUSTOM CUSTOM LOGIC - PANEL LCP-A START CLEANING CYCLE PUSHBUTTON
When the Operator presses the LCP-A Start Clean Cycle push button
the logic is sealed-in only if the Prepare to Clean is already active. 10130 10EHS560L CLEANING LCPA
77 CUSTOM CUSTOM LOGIC - PANEL LCP-A END CLEANING CYCLE PUSHBUTTON
If the Operator presses the End Cycle push button on the LCP-A panel
then seal-in the logic to end the cleaning cycle. The seal-in is released
once the internal end cycle coil activates. The cleaning cycle also ends
automatically if the operator fails to push the Start Cleaning Cycle push
button within a hard coded time delay after the Cleaning Panel Activate
is sealed-in.10131 10EHS560M CLEANING LCPA
78 CUSTOM CUSTOM LOGIC - INTERNAL END CLEANING CYCLE
If both the End Cycle logic from the previous network is sealed-in and
the Wetwell Low Level Alarms inhibit logic turns off then the coil is
activated, which then ends the cleaning cycle and causes all panel
related lights to turn off and the system returns to normal operation. 10131 10EHS560M CLEANING LCPA
79 CUSTOM CUSTOM LOGIC - CLEANING CYCLE ACTIVE STATUS WORD
Generate a status word for CRISP to indicate which step of the
cleaning cycle is active. CRISP will display: STANDBY, DISABLE,
ACTIVATE, PREPARE, START and END. Tag Ext: _STA 10EPL100 PUMPS
80 CUSTOM CUSTOM LOGIC - CLEANING CYCLE ACTIVE MODE
A mode coil is generated and sent to CRISP for display on the pumps'
A/M stations to indicate a cleaning cycle is in progress. Tag Ext: _CAM
Use CRISP A/M ON and OFF symbols.10EPK100 PUMPS
WETWELL LEVEL SCALING AND DEVIATION LOGIC
81 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Wetwell High Level Float 10001 10ELSH040 WW FLOAT 02070 04128 47260
82 CUSTOM CUSTOM LOGIC - BUBBLER PURGE LOGIC
Bubbler purge. Purge Bubbler after the completion of a cleaning cycle
or if Operator Initiated from HMI.3 10EFCP030 WW BUBBLER
83 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Bubbler Low Air Pressure Alarm 10008 10EPSL030 WW BUBBLER 02071 04130 47261
84 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Bubbler 30002 10ELIT030 WW BUBBLER 44144 47262
85 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Ultrasonic 30011 10ELIT035 WW SONIC
86 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(MOD SWS-C12F V1.10)Y
Ultrasonic Level Switch Low (LSL), inhibit when Ultrasonic is not In-
Service and during cleaning cycle.10002 10ELSL035 WW SONIC 02072 04132 47269
87 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(MOD SWS-C12F V1.10)Y
Ultrasonic Level Switch Low Low (LSLL), inhibit when Ultrasonic is not
In-Service and during cleaning cycle.10003 10ELSLL035 WW SONIC 02073 04134 47270
88 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Ultrasonic Fail (Displayed on configuration screen). Inhibit when XMTR
is Out of Service.10004 10EYS035B WW SONIC
89 CUSTOM CUSTOM LOGIC - LEVEL TRANSMITTERS OOS AND INS SELECTION
Allow the operator to place the bubbler or ultrasonic Out Of Service via
CRISP only if the transmitter is not selected as the active level
transmitter. Tag Ext: _ISM _OSM 10ELF030 WW ACT
90 CUSTOM CUSTOM LOGIC - ACTIVE LEVEL TRANSMITTER SELECT
Select either ultrasonic or bubbler as active level transmitter provided
the transmitter is not out of service.10ELE030 WW ACT
91 CUSTOM CUSTOM LOGIC - MOVE RAW VALUE FOR SELECTED TRANSMITTER
Block move the raw input value for the selected level transmitter into a
common register for SWS-C12A's use.10ELD030 WW ACT
92 CUSTOM CUSTOM LOGIC - ACTIVE LEVEL DEVIATION ALARM
Measure the deviation between the two level transmitters to see if the
reading exceeds the hard coded setpoint only if both transmitters are in
service.10ELC030 WW ACT
93 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Alarm when a deviation occurs.10ELDSH030 WW ACT 02074 04136 47271
17410 Attachment D - Sample Program Flowchart Page 4 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
94 CUSTOM CUSTOM LOGIC - CLEANING CYCLE LOW WETWELL LEVEL ALARMS INHIBIT
If the prepare to clean logic is active and the End Cycle logic is off and
the Ultrasonic's wetwell level reading is below the Active Level
transmitter's Low Wetwell Level setpoint then keep alarm inhibit coil
on. Once the alarm inhibit coil turns off a delay timer keeps the alarm
inhibit on for an additional time delay. This logic is used to both inhibit
all wetwell low level alarms and is used by the internal end cycle logic
to complete the cleaning cycle.10ELB030 WW ACT
95 CUSTOM CUSTOM LOGIC - ACTIVE LEVEL EXTERNAL ALARM SIGNALS
Combine the Deviation Alarm and when the Ultrasonic is selected the
Ultrasonic Fail Alarm and when the Bubbler is selected the Bubbler
Low Pressure Alarm to generate the External Common Alarm signals
for the Active Level Transmitter SWS-C12A.10ELA030 WW ACT
96 SWS-C12A TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12A V1.30)
Inhibit Low and Low Low Alarms during the cleaning cycle. Use
external alarm from previous network. Tag Ext: either _ACT _LVL 10ELT030 WW ACT
97 CUSTOM CUSTOM LOGIC - PUMPS POWER FAIL RESTART LOGIC
After a power fail the pumps are placed into Wait Mode until an
Operator initiated Restart is issued from the Configuration Graphic.
Once the Restart is issued individual timers will relase the pumps to
run. Tag Ext: _RST 10EPJ100 PUMPS
PUMP STATION PUMP 1 ALARMS
98 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 Winding High Temperature, inhibit if pump 1 is out of service.02075 04138 47272
99 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 RTD High Temperature, inhibit if pump 1 is out of service.10023 10ETSH110 PUMP 1 MTR 02076 04140 47273
100 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 Bearing Over Temp, inhibit if pump 1 is out of service.10024 10ETSH102 PUMP 1 MTR 02077 04142 47274
101 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 Stator High Moisture, inhibit if pump 1 is out of service. 10025 10EMSH104 PUMP 1 MTR STR 02078 04144 47275
102 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 Oil Chamber High Moisture, inhibit if pump 1 is out of service.10026 10EMSH104A PUMP 1 OIL CHM 02079 04146 47276
103 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 High Vibration, inhibit if pump 1 is out of service.10027 10EVSH108 PUMP 1 02080 04148 47277
104 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 Multilin Trouble, inhibit if pump 1 is out of service.10028 10EYS100D PUMP 1 MULTLIN 02081 04150 47278
105 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 Multilin Tripped, inhibit if pump 1 is out of service.10029 10EYS100E PUMP 1 MULTLIN 02082 04152 47279
106 CUSTOM CUSTOM LOGIC - EXTERNAL WAIT MODE FOR PUMP 1
Place pump 1 into the Wait Mode if the High Winding Temp or High
RTD Temp or High Bearing Temp or High Stator Moisture or High
Vibration or Multilin Trouble or Check Valve Fail to Open or Close
Alarm are active.10EPH100 PUMP 1
107 CUSTOM CUSTOM LOGIC - EXTERNAL COMMON ALARM FOR PUMP 1
Combine High Winding Temp, High RTD Temp, High Bearing Temp,
High Stator Moisture, High Oil Chamber Moisture, High Vibration,
Multilin Trouble, Multilin Tripped and Check Valve Fail to Open or
Close Alarms into a common alarm for pump 1 SWS-C02.10EPG100 PUMP 1
PUMP STATION PUMP 2 ALARMS
108 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 Winding High Temperature, inhibit if pump 2 is out of service.10038 10ETSH203 PUMP 2 MTR 02083 04154 47280
109 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 RTD High Temperature, inhibit if pump 2 is out of service.10039 10ETSH210 PUMP 2 MTR 02084 04156 47281
110 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 Bearing Over Temp, inhibit if pump 2 is out of service.10040 10ETSH202 PUMP 2 MTR 02085 04158 47282
111 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 Stator High Moisture, inhibit if pump 2 is out of service. 10041 10EMSH204 PUMP 2 MTR STR 02086 04160 47283
112 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 Oil Chamber High Moisture, inhibit if pump 2 is out of service.10042 10EMSH204A PUMP 2 OIL CHM 02087 04162 47284
113 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 High Vibration, inhibit if pump 2 is out of service.10043 10EVSH208 PUMP 2 02088 04164 47285
114 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 Multilin Trouble, inhibit if pump 2 is out of service.10044 10EYS200D PUMP 2 MULTLIN 02089 04166 47286
115 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 Multilin Tripped, inhibit if pump 2 is out of service.10045 10EYS200E PUMP 2 MULTLIN 02090 04168 47287
116 CUSTOM CUSTOM LOGIC - EXTERNAL WAIT MODE FOR PUMP 2
Place pump 2 into the Wait Mode if the High Winding Temp or High
RTD Temp or High Bearing Temp or High Stator Moisture or High
Vibration or Multilin Trouble or Check Valve Fail to Open or Close
Alarm are active.10EPD200 PUMP 2
117 CUSTOM CUSTOM LOGIC - EXTERNAL COMMON ALARM FOR PUMP 2
Combine High Winding Temp, High RTD Temp, High Bearing Temp,
High Stator Moisture, High Oil Chamber Moisture, High Vibration,
Multilin Trouble, Multilin Tripped and Check Valve Fail to Open or
Close Alarms into a common alarm for pump 2 SWS-C02.10EPC200 PUMP 2
17410 Attachment D - Sample Program Flowchart Page 5 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
PUMP STATION PUMP 3 ALARMS
118 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 Winding High Temperature, inhibit if pump 3 is out of service.10150 10ETSH303 PUMP 3 MTR 02091 04170 47288
119 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 RTD High Temperature, inhibit if pump 3 is out of service.10151 10ETSH310 PUMP 3 MTR 02092 04172 47289
120 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 Bearing Over Temp, inhibit if pump 3 is out of service.10152 10ETSH302 PUMP 3 MTR 02093 04174 47290
121 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 Stator High Moisture, inhibit if pump 3 is out of service. 10153 10EMSH304 PUMP 3 MTR STR 02094 04176 47291
122 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 Oil Chamber High Moisture, inhibit if pump 3 is out of service.10154 10EMSH304A PUMP 3 OIL CHM 02095 04178 47292
123 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 High Vibration, inhibit if pump 3 is out of service.10155 10EVSH308 PUMP 3 02096 04180 47293
124 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 Multilin Trouble, inhibit if pump 3 is out of service.10156 10EYS300D PUMP 3 MULTLIN 02097 04182 47294
125 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 Multilin Tripped, inhibit if pump 3 is out of service.10157 10EYS300E PUMP 3 MULTLIN 02098 04184 47295
126 CUSTOM CUSTOM LOGIC - EXTERNAL WAIT MODE FOR PUMP 3
Place pump 3 into the Wait Mode if the High Winding Temp or High
RTD Temp or High Bearing Temp or High Stator Moisture or High
Vibration or Multilin Trouble or Check Valve Fail to Open or Close
Alarm are active.10EPD300 PUMP 3
127 CUSTOM CUSTOM LOGIC - EXTERNAL COMMON ALARM FOR PUMP 3
Combine High Winding Temp, High RTD Temp, High Bearing Temp,
High Stator Moisture, High Oil Chamber Moisture, High Vibration,
Multilin Trouble, Multilin Tripped and Check Valve Fail to Open or
Close Alarms into a common alarm for pump 3 SWS-C02.10EPC300 PUMP 3
PUMP STATION PUMP 4 ALARMS
128 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 Winding High Temperature, inhibit if pump 4 is out of service.10166 10ETSH403 PUMP 4 MTR 02099 04186 47296
129 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 RTD High Temperature, inhibit if pump 4 is out of service.10167 10ETSH410 PUMP 4 MTR 02100 04188 47297
130 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 Bearing Over Temp, inhibit if pump 4 is out of service.10168 10ETSH402 PUMP 4 MTR 02101 04190 47298
131 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 Stator High Moisture, inhibit if pump 4 is out of service. 10169 10EMSH404 PUMP 4 MTR STR 02102 04192 47299
132 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 Oil Chamber High Moisture, inhibit if pump 4 is out of service.10170 10EMSH404A PUMP 4 OIL CHM 02103 04194 47300
133 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 High Vibration, inhibit if pump 4 is out of service.10171 10EVSH408 PUMP 4 02104 04196 47301
134 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 Multilin Trouble, inhibit if pump 4 is out of service.10172 10EYS400D PUMP 4 MULTLIN 02105 04198 47302
135 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 Multilin Tripped, inhibit if pump 4 is out of service.10173 10EYS400E PUMP 4 MULTLIN 02106 04200 47303
136 CUSTOM CUSTOM LOGIC - EXTERNAL WAIT MODE FOR PUMP 4
Place pump 4 into the Wait Mode if the High Winding Temp or High
RTD Temp or High Bearing Temp or High Stator Moisture or High
Vibration or Multilin Trouble or Check Valve Fail to Open or Close
Alarm are active.10EPD400 PUMP 4
137 CUSTOM CUSTOM LOGIC - EXTERNAL COMMON ALARM FOR PUMP 4
Combine High Winding Temp, High RTD Temp, High Bearing Temp,
High Stator Moisture, High Oil Chamber Moisture, High Vibration,
Multilin Trouble, Multilin Tripped and Check Valve Fail to Open or
Close Alarms into a common alarm for pump 4 SWS-C02.10EPC400 PUMP 4
PUMP STATION PUMPS 1 THRU 4 CLEANING CYCLE LOGIC
17410 Attachment D - Sample Program Flowchart Page 6 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
138 CUSTOM CUSTOM LOGIC - PUMP 1 MANUAL MODE LOGIC DURING CLEANING CYCLE
During cleaning cycles pump 1 is directly controlled from the field, the
A/M station is not in control during cleaning cycles.
Once the Cleaning Cycle begins the SWS-C15A and SWS-C02
templates will display Auto/Auto mode on the CRISP HMI display but
the templates will internally be controlled by the LCP-A pushbuttons.
The CRISP Pump 1 Auto/Manual buttons and the On/Off/Auto button
are transferred through this block of logic to the pump 1 SWS-C15A
and SWS-C02 templates.
During cleaning cycles pump 1 is internally locked into Manual Mode
(for On/Off/Auto). At the start of the cleaning cycle when the Operator
presses the Prepare to Clean Pushbutton on LCP-A, Pump 1 is initially
locked into the On mode. Once the Operator presses the Start
Cleaning cycle Pushbutton the Pump 1 Start/Stop pushbuttons on LCP-
A can manually control the operation of Pump 1.
When the cleaning cycle is not active the HMI speed setpoint is passed
to the Pump 1 A/M Station, when the cleaning cycle is in Prepare To
Clean mode lock Pump 1 to 60% speed. When the cleaning cycle
switches to the Start Cleaning Cycle mode, the 60% speed setpoint
stops transferring to the A/M station so that the LCP-A push buttons
can manipulate the speed of the pump. If at anytime the pump is
turned off the a 0 value is loaded into the speed setpoint.10EPF100 PUMP 1
139 CUSTOM CUSTOM LOGIC - PUMP 2 MANUAL MODE LOGIC DURING CLEANING CYCLE
Cleaning cycle manual control for Pump 2, see Pump 1 above for
detailed description with the exception that Pump 2 is initially off when
the cleaning cycle begins, it can be manually started once the Operator
initiates the Start Cleaning Cycle operation.10EPB200 PUMP 2
140 CUSTOM CUSTOM LOGIC - PUMP 3 MANUAL MODE LOGIC DURING CLEANING CYCLE
Cleaning cycle manual control for Pump 3, see Pump 1 above for
detailed description with the exception that Pump 3 is initially off when
the cleaning cycle begins, it can be manually started once the Operator
initiates the Start Cleaning Cycle operation.10EPB300 PUMP 3
141 CUSTOM CUSTOM LOGIC - PUMP 4 MANUAL MODE LOGIC DURING CLEANING CYCLE
Cleaning cycle manual control for Pump 4, see Pump 1 above for
detailed description with the exception that Pump 4 is initially off when
the cleaning cycle begins, it can be manually started once the Operator
initiates the Start Cleaning Cycle operation.10EPB400 PUMP 4
PUMP STATION LEVEL CONTROL LOGIC
142 SWS-C15C MANUAL LOADING STATION TEMPLATE LOGIC(SWS-C15C V1.10)10EPE100 PUMPS 07053 42091 44145 47304
143 SWS-C09 PID CONTROL, CLOSED LOOP TEMPLATE LOGIC(SWS-C09 V2.00)10EPD100 PUMPS 42092 44147 47305
144 SWS-C15A AUTO/MANUAL STATION TEMPLATE LOGIC(SWS-C15A V1.01)10EPC100 PUMPS 02107 04202 07055 42096 44152 47348
145 SWS-C11 LEAD/LAG1/LAG2/LAG3/LAG4, VAR SPD TEMPLATE LOGIC(SWS-C11 V1.12)Allow pump sequence to start only if the Knott Valve is not closed.10EPB100 PUMPS 02109 04204 07057 42097 44154 47349
146 SWS-C15A AUTO/MANUAL STATION TEMPLATE LOGIC(MOD SWS-C15A V1.01)Y Pump 1 10EPA100 PUMP 1 02114 04209 07134 42107 44169 47410
147 SWS-C02 PUMP CONTROL, VARIABLE SPEED TEMPLATE LOGIC (SWS-C02 V1.20)Pump 1 1 10EPMP100 PUMP 1 02116 04211 07136 42108 44171 47411
148 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Pump 1 10018 10EYS100 PUMP 1 02124 07143 44175 47432
149 SWS-C15A AUTO/MANUAL STATION TEMPLATE LOGIC(MOD SWS-C15A V1.01)Y Pump 2 10EPA200 PUMP 2 02125 04225 07144 42109 44179 47433
150 SWS-C02 PUMP CONTROL, VARIABLE SPEED TEMPLATE LOGIC (SWS-C02 V1.20)Pump 2 9 10EPMP200 PUMP 2 02127 04227 07146 42110 44181 47434
151 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Pump 2 10034 10EYS200 PUMP 2 02135 07153 44185 47455
152 SWS-C15A AUTO/MANUAL STATION TEMPLATE LOGIC(SWS-C15A V1.01)Y Pump 3 10EPA300 PUMP 3 02136 04241 07154 42111 44189 47456
153 SWS-C02 PUMP CONTROL, VARIABLE SPEED TEMPLATE LOGIC (SWS-C02 V1.20)Pump 3 33 10EPMP300 PUMP 3 02138 04243 07156 42112 44191 47457
154 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Pump 3 10146 10EYS300 PUMP 3
155 SWS-C15A AUTO/MANUAL STATION TEMPLATE LOGIC(SWS-C15A V1.01)Y Pump 4 10EPA400 PUMP 4 02146 04257 07163 42113 44195 47478
156 SWS-C02 PUMP CONTROL, VARIABLE SPEED TEMPLATE LOGIC (SWS-C02 V1.20)Pump 4 41 10EPMP400 PUMP 4 02148 04259 07165 42114 44197 47479
17410 Attachment D - Sample Program Flowchart Page 7 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
157 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Pump 4 10162 10EYS400 PUMP 4
158 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)
Convert the pump 1 speed signal to RPMs for display on the detail
graphic. Tag Ext: _RPM 30001 10EST100 PUMP 1 44201 47500
159 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)
Convert the pump 2 speed signal to RPMs for display on the detail
graphic. Tag Ext: _RPM 30010 10EST200 PUMP 2 44202 47507
160 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)
Convert the pump 3 speed signal to RPMs for display on the detail
graphic. Tag Ext: _RPM 30019 10EST300 PUMP 3 44203 47514
161 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)
Convert the pump 4 speed signal to RPMs for display on the detail
graphic. Tag Ext: _RPM 30028 10EST400 PUMP 4 44204 47521
PUMP CHECK VALVE STATUS INDICATION LOGIC
162 CUSTOM CUSTOM LOGIC - PUMP 1 CHECK VALVE STATUS DISPLAY Converts the pump 1 check valve closed limit switch to a display word. 10030 10EZSC105 PUMP 1 CHK VLV
163 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y
Pump 1 check valve fail to open or close alarm. Inhibited when pump is
Out of Service.10030 10EZSC105 PUMP 1 CHK VLV 02156 04273 47528
164 CUSTOM CUSTOM LOGIC - PUMP 2 CHECK VALVE STATUS DISPLAY Converts the pump 2 check valve closed limit switch to a display word. 10046 10EZSC205 PUMP 2 CHK VLV
165 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y
Pump 2 check valve fail to open or close alarm. Inhibited when pump is
Out of Service.10046 10EZSC205 PUMP 2 CHK VLV 02158 04275 47529
166 CUSTOM CUSTOM LOGIC - PUMP 3 CHECK VALVE STATUS DISPLAY Converts the pump 3 check valve closed limit switch to a display word. 10158 10EZSC305 PUMP 3 CHK VLV
167 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y
Pump 3 check valve fail to open or close alarm, enabled when pump
starts. Inhibited when pump is Out of Service.10158 10EZSC305 PUMP 3 CHK VLV 02160 04277 47530
168 CUSTOM CUSTOM LOGIC - PUMP 4 CHECK VALVE STATUS DISPLAY Converts the pump 4 check valve closed limit switch to a display word. 10174 10EZSC405 PUMP 4 CHK VLV
169 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y
Pump 4 check valve fail to open or close alarm, enabled when pump
starts. Inhibited when pump is Out of Service.10174 10EZSC405 PUMP 4 CHK VLV 02162 04279 47531
170 CUSTOM CUSTOM LOGIC - PUMP RUNNING
Sum all 4 pump runs to create an internal coil to indicate that at least 1
pump is running.10EPMP100 PUMPS
CUSTOM DRAIN PUMPS LOGIC
171 CUSTOM CUSTOM LOGIC - DRAIN PUMPS LEAD/STANDBY SELECT LOGIC
Lead/Standby select logic allows Drain Pump 1 or 2 to be selected for
lead duty.10EPD880 DRN PUMPS
172 CUSTOM CUSTOM LOGIC - DRAIN PUMPS START/STOP AUTORUN LOGIC
When the Wetwell level is above the lead start setpoint, start the leard
Drain Pump. When the wetwell level is below the lead stop level, stop
the lead Drain Pump.10EPC880 DRN PUMPS
173 CUSTOM CUSTOM LOGIC - DRAIN PUMPS AUTORUN LOGIC
Start the Lead Drain pump (or Standby if Lead is unavailable) if none of
the main pumps are running and the Knott Gate is closed and the level
in the wetwell exceeds the lead pump start level.10EPC880 DRN PUMPS
174 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Drain pump 1 Winding High Temperature, inhibit if Drain pump 1 is out
of service.10053 10ETSH883 DRN P1 MTR 02164 04281 47532
175 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Drain pump 1 High Moisture, inhibit if Drain pump 1 is out of service.10054 10EMSH884 DRN P1 MTR 02165 04283 47533
176 CUSTOM CUSTOM LOGIC - EXTERNAL WAIT MODE FOR DRAIN PUMP 1
Place Drain pump 1 into the Wait Mode if the High Winding Temp or
High Moisture or Check Valve Fail to Open or Close Alarm are active.10EPB880 DRN P1
177 CUSTOM CUSTOM LOGIC - EXTERNAL COMMON ALARM FOR DRAIN PUMP 1
Combine High Winding Temp, High Moisture and Check Valve Fail to
Open or Close Alarms into a common alarm for Drain Pump 1 SWS-
C01.10EPA880 DRN P1
178 SWS-C01 PUMP CONTROL, CONSTANT SPEED TEMPLATE LOGIC(SWS-C01 V1.30)Drain Pump 1.13 10EPMP880 DRN P1 02166 04285 07172 44205 47534
179 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Drain Pump 1.10050 10EYS880 DRN P1 02174 07173 44207 47535
180 CUSTOM CUSTOM LOGIC - PUMP 1 CHECK VALVE STATUS DISPLAY
Converts the drain pump 1 check valve closed limit switch to a display
word.10055 10EZSC885 DRN P1 CHK VLV
181 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y
Drain pump 1 check valve fail to open or close alarm. Inhibited when
pump is Out of Service.10055 10EZSC885 DRN P1 CHK VLV 02175 04299 47536
17410 Attachment D - Sample Program Flowchart Page 8 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
182 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Drain pump 2 Winding High Temperature, inhibit if Drain pump 2 is out
of service.10181 10ETSH893 DRN P2 MTR 02177 04301 47537
183 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Drain pump 2 High Moisture, inhibit if Drain pump 2 is out of service.10182 10EMSH894 DRN P2 MTR 02178 04303 47538
184 CUSTOM CUSTOM LOGIC - EXTERNAL WAIT MODE FOR DRAIN PUMP 2
Place Drain pump 2 into the Wait Mode if the High Winding Temp or
High Moisture or Check Valve Fail to Open or Close Alarm are active.10EPB890 DRN P2
185 CUSTOM CUSTOM LOGIC - EXTERNAL COMMON ALARM FOR DRAIN PUMP 2
Combine High Winding Temp, High Moisture and Check Valve Fail to
Open or Close Alarms into a common alarm for Drain pump 2 SWS-
C01.10EPA890 DRN P2
186 SWS-C01 PUMP CONTROL, CONSTANT SPEED TEMPLATE LOGIC(SWS-C01 V1.30)Drain Pump 2.45 10EPMP890 DRN P2 02179 04305 07174 44211 47539
187 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Drain Pump 2.10178 10EYS890 DRN P2 02187 07175 44213 47540
188 CUSTOM CUSTOM LOGIC - PUMP 1 CHECK VALVE STATUS DISPLAY
Converts the drain pump 2 check valve closed limit switch to a display
word.10183 10EZSC895 DRN P2 CHK VLV
189 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y
Drain pump 2 check valve fail to open or close alarm. Inhibited when
pump is Out of Service.10183 10EZSC895 DRN P2 CHK VLV 02188 04319 47541
DISCHARGE PRESSURE AND FLOW LOGIC
190 SWS-C12A TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12A V1.30)
Discharge pressure meter High and High High operate continuously,
Low and Low Low only operate when a main sewage pump is running. 30029 10EPIT070 DISCHARGE
191 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Discharge flow meter trouble alarm 10199 10EYS075B DISCHARGE FLOW
192 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Discharge flow meter.30020 10EFIT075 DISCHARGE 44217 47542
193 SWS-C19 TOTALIZER TEMPLATE LOGIC(SWS-C19 V1.11)Discharge flow meter totalizer.30020 10EFIT075 DISCHARGE 07176 44218 47549
DRYWELL SUMP PUMPS LOGIC
194 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Drywell High Level Alarm 10114 10ELSH024 DRYWELL FLOAT 02190 04321 47575
195 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Drywell Sumps 1 & 2 High Level Alarm 10099 10ELSH029 SUMP 1&2 FLOAT 02191 04323 47576
196 CUSTOM CUSTOM LOGIC - SUMP PUMP 1 RUN TO HMI Send On signal from Sump Pump 1 to HMI for display.10097 10EYS020 SUMP PUMP 1
197 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Sump Pump 1 runtime.10097 10EYS020 SUMP PUMP 1 02192 07177 44228 47577
198 CUSTOM CUSTOM LOGIC - SUMP PUMP 2 RUN TO HMI Send On signal from Sump Pump 2 to HMI for display.10209 10EYS025 SUMP PUMP 2
199 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Sump Pump 2 runtime.10209 10EYS025 SUMP PUMP 2
200 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Sump Pumps 1 & 2 combined Trouble Alarms.10098 10EYS023B SUMP PUMPS 1&2 02193 04325 47578
201 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Drywell Sumps 3 & 4 High Level Alarm 10227 10ELSH229 SUMP 3&4 FLOAT 02194 04327 47579
202 CUSTOM CUSTOM LOGIC - SUMP PUMP 3 RUN TO HMI Send On signal from Sump Pump 3 to HMI for display.10113 10EYS220 SUMP PUMP 3
203 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Sump Pump 3 runtime.10113 10EYS220 SUMP PUMP 3 02195 07178 44232 47580
204 CUSTOM CUSTOM LOGIC - SUMP PUMP 4 RUN TO HMI Send On signal from Sump Pump 4 to HMI for display.10225 10EYS225 SUMP PUMP 4
205 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Sump Pump 4 runtime.10225 10EYS225 SUMP PUMP 4 02196 07179 44236 47581
206 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Sump Pumps 3 & 4 combined Trouble Alarms.10226 10EYS219B SUMP PUMPS 3&4 02197 04329 47582
207 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Drywell Smoke Alarm.10085 10EASH063 DRYWELL 02198 04331 47583
SUPPLY AND EXHAIST FANS LOGIC
208 CUSTOM CUSTOM LOGIC - SUPPLY AND EXHAUST FANS PAUSE
Use the pause pushbuttons to create a pause signal for the supply and
exhaust fans External Wait mode circuit, include an off delay timer to
hold keep fans off for an additional 10 seconds after the button is
released.10197 10EHS059 DRYWELL FANS
209 CUSTOM CUSTOM LOGIC - SUPPLY FANS LEAD/STANDBY SELECT LOGIC
Lead/Standby select logic allows Supply Fan 1 or 2 to be selected for
lead duty.10EFC053 DRYWELL FANS
210 CUSTOM CUSTOM LOGIC - SUPPLY FANS LEAD/STANDBY AUTORUN LOGIC
Based on HMI selection generate an auto run signal for the lead supply
fan. If the lead supply fan is in Wait Mode start the standby supply fan.10EFB054 DRYWELL FANS
211 CUSTOM CUSTOM LOGIC - SUPPLY FAN 1 INLET DAMPER STATUS DISPLAY
Converts the supply fan 1 inlet damper opened and closed limit
switches to a display word.10093 10EZSC099 SF1 DMPR INLT
17410 Attachment D - Sample Program Flowchart Page 9 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
212 CUSTOM CUSTOM LOGIC - SUPPLY FAN 1 EXTERNAL WAIT MODE
Activate the Supply Fan 1 External Wait Mode if the Supply Fan's Low
Flow Alarm is active or if the Smoke Detector Alarm is active or if
neither Exhaust Fan's On signal indicates runinng or if both Exhaust
Fans' Low Flow Alarms are active.10EFA053 DRYWELL SF1
213 SWS-C01 PUMP CONTROL, CONSTANT SPEED TEMPLATE LOGIC(SWS-C01 V1.30)Drywell Supply Fan SF1 (remove buttons from graphic always in auto)4 10EFAN053 DRYWELL SF1 02199 04333 07180 44240 47584
214 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Drywell Supply Fan SF1 Runtime 10089 10EYS053 DRYWELL SF1 02207 07181 44242 47585
215 CUSTOM CUSTOM LOGIC - SUPPLY FAN 1 OUTLET DAMPER STATUS DISPLAY
Converts the supply fan 1 outlet damper opened and closed limit
switches to a display word.10073 10EZSC118 SF1 DMPR OUTLT
216 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y Drywell Supply Fan SF1 Low Flow Alarm, inhibit if fan in not On.10092 10EFSL054 DRYWELL SF1 02208 04347 47586
217 CUSTOM CUSTOM LOGIC - SUPPLY FAN 2 INLET DAMPER STATUS DISPLAY
Converts the supply fan 2 inlet damper opened and closed limit
switches to a display word.10205 10EZSC098 SF2 DMPR INLT
218 CUSTOM CUSTOM LOGIC - SUPPLY FAN 2 EXTERNAL WAIT MODE
Activate the Supply Fan 2 External Wait Mode if the Supply Fan's Low
Flow Alarm is active or if the Smoke Detector Alarm is active or if
neither Exhaust Fan's On signal indicates runinng or if both Exhaust
Fans' Low Flow Alarms are active.10EFA057 DRYWELL SF2
219 SWS-C01 PUMP CONTROL, CONSTANT SPEED TEMPLATE LOGIC(SWS-C01 V1.30)Drywell Supply Fan SF2 (remove buttons from graphic always in auto)35 10EFAN057 DRYWELL SF2 02210 04349 07182 44246 47587
220 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Drywell Supply Fan SF2 Runtime 10201 10EYS057 DRYWELL SF2 02218 07183 44248 47588
221 CUSTOM CUSTOM LOGIC - SUPPLY FAN 2 OUTLET DAMPER STATUS DISPLAY
Converts the supply fan 2 outlet damper opened and closed limit
switches to a display word.10207 10EZSC117 SF2 DMPR OUTLT
222 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y Drywell Supply Fan SF2 Low Flow Alarm, inhibit if fan in not On.10204 10EFSL058 DRYWELL SF2 02219 04363 47589
223 CUSTOM CUSTOM LOGIC - EXHAUST FANS LEAD/STANDBY AUTORUN LOGIC
Based on HMI selection generate an auto run signal for the lead
exhaust fan. If the lead exchaust fan is in Wait Mode start the standby
exhaust fan.
224 CUSTOM CUSTOM LOGIC - EXHAUST FAN 1 INLET DAMPER STATUS DISPLAY
Converts the exhaust fan 1 inlet damper opened and closed limit
switches to a display word.10125 10EZSC122 EF1 DMPR INLT
225 CUSTOM CUSTOM LOGIC - EXHAUST FAN 1 EXTERNAL WAIT MODE
Activate the Exhaust Fan 1 External Wait Mode if the Exhaust Fan's
Low Flow Alarm is active or if the Smoke Detector Alarm is active.
226 SWS-C01 PUMP CONTROL, CONSTANT SPEED TEMPLATE LOGIC(SWS-C01 V1.30)Drywell Exhaust Fan EF1 (remove buttons from graphic always in auto) 12 10EFAN051 DRYWELL EF1 02221 04365 07184 44252 47590
227 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Drywell Exhaust Fan EF1 Runtime 10105 10EYS051 DRYWELL EF1 02229 07185 44254 47591
228 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y Drywell Exhaust Fan EF1 Low Flow Alarm, inhibit if fan in not On.10108 10EFSL052 DRYWELL EF1 02230 04379 47592
229 CUSTOM CUSTOM LOGIC - EXHAUST FAN 2 INLET DAMPER STATUS DISPLAY
Converts the exhaust fan 2 inlet damper opened and closed limit
switches to a display word.10228 10EZSC123 EF2 DMPR INLT
230 CUSTOM CUSTOM LOGIC - EXHAUST FAN 2 EXTERNAL WAIT MODE
Activate the Exhaust Fan 2 External Wait Mode if the Exhaust Fan's
Low Flow Alarm is active or if the Smoke Detector Alarm is active.
231 SWS-C01 PUMP CONTROL, CONSTANT SPEED TEMPLATE LOGIC(SWS-C01 V1.30)Drywell Exhaust Fan EF2 (remove buttons from graphic always in auto) 44 10EFAN055 DRYWELL EF2 02232 04381 07186 44258 47593
232 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Drywell Exhaust Fan EF2 Runtime 10217 10EYS055 DRYWELL EF2 02240 07187 44260 47594
233 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y Drywell Exhaust Fan EF2 Low Flow Alarm, inhibit if fan is not On.10220 10EFSL056 DRYWELL EF2 02241 04395 47595
FOUL AIR BOOSTER FANS LOGIC
236 SWS-C01 PUMP CONTROL, CONSTANT SPEED TEMPLATE LOGIC(SWS-C01 V1.30)
Foul Air Booster Fan, add Low Flow Alarm to External Wait mode and
External Common Alarm inputs.5 10EFAN170 BOOSTER FAN 02243 04397 07188 44264 47596
237 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Foul Air Booster Fan 10121 10EYS170 BOOSTER FAN 02251 07189 44266 47597
238 SWS-C12G DISCRETE ALARM W/RESET TEMPLATE LOGIC(MOD SWS-C12G V1.00)Y Foul Air Booster Fan Low Flow Alarm, inhibit when fan is off.10124 10EFSL171 BOOSTER FAN 02252 04411 47598
239 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Gas Monitor High High Level alarm.10005 10EASHH050 WW GAS MONITOR 02254 04413 47599
240 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Gas Monitor High Level alarm.10006 10EASH050 WW GAS MONITOR 02255 04415 47600
241 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Gas Monitor Trouble alarm.10007 10EYS050B WW GAS MONITOR 02256 04417 47601
242 CUSTOM CUSTOM LOGIC - GAS MONITOR COMMON TROUBLE ALARM
Gas Monitor common alarm, combine the High High and the High for
the SWS-C12A.
243 SWS-C12A TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12A V1.30)Gas Monitor, uses Hi and Hi Hi only. Inhibit alarms on failure.30003 10EAIT050 WW GAS MONITOR 02257 04419 07190 42115 44270 47602
17410 Attachment D - Sample Program Flowchart Page 10 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
244 CUSTOM CUSTOM LOGIC - SAFE TO ENTER PUMP STATION WARNING LIGHTS
Combine the Gas Monitor Trouble Alarm, Hi Level Alarm, Hi Hi Level
Alarm, Supply Fan 1 On or Supply Fan 2 On, Exhaust Fan 1 On or
Exhaust Fan 2 On, Supply Fan 1 Low Flow Alarm or Supply Fan 2 Low
Flow Alarm, Exhaust Fan 1 Low Flow Alarm or Exhaust Fan 2 Low
Flow Alarm and Smoke Detector signals so that if any of these
conditions change from their normal state the Safe to Enter output coil
is turned off, resulting in the green light on the outside of the station
turning off and the red light turning on.11 10EYL042 PUMP STATION
ROOM AC LOGIC
245 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)A/C System Temperature High 10067 10ETSH064 ACU SYSTEM 02261 04429 47617
246 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Control Room A/C Unit 1 Overload Alarm.10069 10EYS065B ACU-1 SYSTEM 02262 04431 47618
247 CUSTOM CUSTOM LOGIC - AC UNIT 1 ON STATUS DISPLAY A/C Unit 1 On Status Display to HMI.10068 10EYS065 ACU-1 SYSTEM
248 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Control Room A/C Unit 1 Runtime.10068 10EYS065 ACU-1 SYSTEM 02263 07195 44275 47619
249 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Control Room A/C Unit 2 Overload Alarm.10096 10EYS066B ACU-2 SYSTEM 02264 04433 47620
250 CUSTOM CUSTOM LOGIC - AC UNIT 2 ON STATUS DISPLAY A/C Unit 2 On Status Display to HMI.10095 10EYS066 ACU-2 SYSTEM
251 SWS-C13 MOTOR RUNTIME TEMPLATE LOGIC(SWS-C13 V1.02)Control Room A/C Unit 2 Runtime.10095 10EYS066 ACU-2 SYSTEM 02265 07196 44279 47621
BREAKER, TRANSFORMER, SWITCHGEAR AND UPS LOGIC
252 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Breaker F37 Funct Fault/Trouble 10110 10EYS115 BREAKER F37 02266 04435 47622
253 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Breaker F37 Lockout Trip 10111 10EYS115A BREAKER F37 02267 04437 47623
254 CUSTOM CUSTOM LOGIC - BREAKER F37 CLOSED STATUS DISPLAY Breaker F37 Closed Status to HMI 10109 10EZSC115 BREAKER F37
255 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Transformer F37 Blown Fuse 10101 10EYS119 XFMR F37 DC SW 02268 04439 47624
256 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Transformer F37 Common Trouble 10100 10EYS115B XFMR F37 02269 04441 47625
257 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Breaker F38 Funct Fault/Trouble 10222 10EYS120 BREAKER F38 02270 04443 47626
258 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Breaker F38 Lockout Trip 10223 10EYS120A BREAKER F38 02271 04445 47627
259 CUSTOM CUSTOM LOGIC - BREAKER F38 CLOSED STATUS DISPLAY Breaker F38 Closed Status to HMI 10221 10EZSC120 BREAKER F38
260 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Transformer F38 Blown Fuse 10211 10EYS124 XFMR F38 DC SW 02272 04447 47628
261 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Transformer F38 Common Trouble 10210 10EYS120B XFMR F38 02273 04449 47629
262 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Switchgear 125VDC Charger Trouble 10212 10EYS115C SWG 125VDC CHG 02274 04451 47630
263 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Switchgear HRGU1 Trouble 10082 10EYS125 SWG HRGU1 02275 04453 47631
264 CUSTOM CUSTOM LOGIC - SWITCHGEAR MAIN BREAKER A STATUS DISPLAY Switchgear Circuit Breaker A Closed Status to HMI.10083 10EZSC125 SWG CKT BKR A
265 CUSTOM CUSTOM LOGIC - SWITCHGEAR TIE-BREAKER A STATUS DISPLAY Switchgear Tie-Breaker A Closed Status to HMI.10084 10EZSC125A SWG TIE BKR A
266 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Switchgear HRGU2 Trouble 10194 10EYS125A SWG HRGU2 02276 04455 47632
267 CUSTOM CUSTOM LOGIC - SWITCHGEAR MAIN BREAKER B STATUS DISPLAY Switchgear Circuit Breaker B Closed Status to HMI.10195 10EZSC125C SWG CKT BKR B
268 CUSTOM CUSTOM LOGIC - SWITCHGEAR TIE-BREAKER B STATUS DISPLAY Switchgear Tie-Breaker B Closed Status to HMI.10196 10EZSC125B SWG TIE BKR B
269 CUSTOM CUSTOM LOGIC - SWITCHGEAR TRANSFER MODE STATUS DISPLAY Switchgear Transfer Mode Auto Status to HMI.10115 10EYS125B SWG TRANS MOD
270 CUSTOM CUSTOM LOGIC - SWITCHGEAR POWER SOURCE BUS A STATUS DISPLAY Switchgear Power Source Bus A Status to HMI.10116 10EYS125C SWG PWR SOURCE
271 CUSTOM CUSTOM LOGIC - SWITCHGEAR POWER SOURCE NORMAL STATUS DISPLAY Switchgear Power Source Normal Status to HMI.10117 10EYS125D SWG PWR SOURCE
272 CUSTOM CUSTOM LOGIC - SWITCHGEAR POWER SOURCE BUS B STATUS DISPLAY Switchgear Power Source Bus B Status to HMI.10118 10EYS125E SWG PWR SOURCE
273 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Switchgear Power Monitor Bus A Power Failure Status to HMI 10081 10EYS125B PWR MON BUS A 02277 04457 47633
274 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Switchgear Power Monitor Bus B Power Failure Status to HMI 10193 10EYS126B PWR MON BUS B 02278 04459 47634
275 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Switchgear Power Monitor MCC A Power Failure Status to HMI 10057 10EYS129B PWR MON MCC A 02279 04461 47635
276 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Switchgear Power Monitor MCC B Power Failure Status to HMI 10184 10EYS130B PWR MON MCC B 02280 04463 47636
277 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Switchgear Power Monitor Future Power Failure Status to HMI 10058 10EYS165B PWR MON FUTURE 02281 04465 47637
278 CUSTOM CUSTOM LOGIC - SWITCHGEAR MCC-A FEEDER BREAKER STATUS DISPLAY Switchgear MCC-A Feeder Breaker Status to HMI 10102 10EZSC129 SWG FDR MCC A
279 CUSTOM CUSTOM LOGIC - SWITCHGEAR MCC-B FEEDER BREAKER STATUS DISPLAY Switchgear MCC-B Feeder Breaker Status to HMI 10214 10EZSC130 SWG FDR MCC B
280 CUSTOM CUSTOM LOGIC - SWITCHGEAR FUTURE FEEDER BREAKER STATUS DISPLAY Switchgear Future Feeder Breaker Status to HMI 10103 10EZSC165 SWG FDR SPARE
281 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)UPS AC Line Fail Alarm 10071 10EJSL060J UPS AC LINE 02282 04467 47638
282 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)UPS Bypass Alarm 10070 10EYS060J UPS BYPASS 02283 04469 47639
283 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)UPS Trouble Alarm 10056 10EYS060B UPS INV 02284 04471 47640
PANEL ALARM LOGIC
17410 Attachment D - Sample Program Flowchart Page 11 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
284 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)UPS Low Battery Alarm 10072 10EESL060 UPS BATTERY 02285 04473 47641
285 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)LCP panel Instrument Power Supply Fail Alarm 10066 10EJSL068J INST PWR PLC 02286 04475 47642
286 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)RIO A panel Instrument Power Supply Fail Alarm 10086 10EJSL068K INST PWR RIO A 02287 04477 47643
287 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)RIO B panel Instrument Power Supply Fail Alarm 10198 10EJSL068L INST PWR RIO B 02288 04479 47644
PUMPS 1 THRU 4 CLEANING CYCYLE LOGIC
288 CUSTOM CUSTOM LOGIC - INTERNAL CLEANING CYCLE DISABLE
First create three coils to ensure each of the three pumps is in the
correct mode for the cleaning cycle. Pump 1 must be in the
Auto(Auto/Manual)/Auto(On/Off/Auto) mode with no Wait Mode
conditions. Pumps 2 and 3 must be in the Off Mode or the
Auto(On/Off/Auto) Mode or the Out Of Service Mode. The Wetwell
must not have a High Float Level Alarm or Hi Hi or Hi Active Level
Alarm. The Ultrasonic Transmitter cannot have a Trouble Alarm or be
Out of Service or have any of the Pump 1 to 3 Start Alarms active.
The Recycle Valve cannot be Out Of Service. The station flow through
the discharge flowmeter must be less than the hard coded cutoff. If
any condition becomes active after the cleaning cycle begins (except
the high flow cutoff) the internal disable is energized and the cleaning
cycle aborted.18 10EYL560P CLEANING LCP
289 CUSTOM CUSTOM LOGIC - CLEANING CYCLE STATUS DISPLAYS ON LCP PANEL
Display the Activated light if the Cleaning Cycle Activate logic is on.
Display the Cleaning Cycle Disabled status on the LCP Panel if the
internal cleaning cycle disabled logic from the previous network is on. 17 10EYL560J CLEANING LCP
290 CUSTOM CUSTOM LOGIC - CLEANING CYCLE STATUS DISPLAYS ON LCP-A PANEL
Display the Activated and Ready statuses based on the associated
logic at the beginning of this program on the LCP-A Panel.19 10EYL560N CLEANING LCPA
291 CUSTOM CUSTOM LOGIC - CLEANING CYCLE STATUS DISPLAYS ON LCP-A PANEL
Display the Prepared to Clean, Started Clean Cycle and Ended Cycle
based on the associated logic at the beginning of this program on the
LCP-A Panel.20 10EYL560K CLEANING LCPA
292 CUSTOM CUSTOM LOGIC - PUMP 1 ON STATUS DISPLAYED ON LCP-A PANEL Display the Pump 1 On status at the LCP-A cleaning panel.24 10EYL100L PUMP 1 LCPA
293 CUSTOM CUSTOM LOGIC - PUMP 2 ON STATUS DISPLAYED ON LCP-A PANEL Display the Pump 2 On status at the LCP-A cleaning panel.25 10EYL200L PUMP 2 LCPA
294 CUSTOM CUSTOM LOGIC - PUMP 3 ON STATUS DISPLAYED ON LCP-A PANEL Display the Pump 3 On status at the LCP-A cleaning panel.26 10EYL300L PUMP 3 LCPA
295 CUSTOM CUSTOM LOGIC - PUMP 4 ON STATUS DISPLAYED ON LCP-A PANEL Display the Pump 4 On status at the LCP-A cleaning panel.27 10EYL400L PUMP 4 LCPA
296 CUSTOM CUSTOM LOGIC - ANALOG ACTIVE LEVEL DISPLAY TO DRYWELL Output the Active Level value to a display in the Drywell.40002 10ELI034A WW ACT DRYWELL
297 CUSTOM CUSTOM LOGIC - ANALOG ACTIVE LEVEL DISPLAY TO ELECTRICAL ROOM Output the Active Level value to a display in the Electrical Room.40006 10ELI034B WW ACT ELEC RM
298 CUSTOM CUSTOM LOGIC - ANALOG ACTIVE LEVEL DISPLAY TO LCP-A
Output the Active Level value to a display on the front of the LCP-A
panel.40003 10ELI034D WW ACT LCPA
299 CUSTOM CUSTOM LOGIC - ANALOG DISCHARGE FLOW DISPLAY TO LCP-A
Output the Discharge Flow value to a display on the front of the LCP-A
panel.40004 10EFI075A DISCHARGE LCPA
300 CUSTOM CUSTOM LOGIC - CONVERT ENGINEERING UNITS PUMP SPEED TO RAW
Convert the Pumps Speed Setpoint from engineering units to a raw
value that can be sent to the LCP-A display.
301 CUSTOM CUSTOM LOGIC - PUMPS SPEED DISPLAY TO LCP-A
Output the Pumps Speed value to a display on the front of the LCP-A
panel.40007 10ESI560 PUMPS LCPA
POWER MONITOR READING FOR INFORMATION DISPLAY AND ALARMING
302 CUSTOM CUSTOM LOGIC - SEND BUS-A VOLTAGE READING FROM POWER MONITOR TO HMI Transfer the Voltage reading from the power monitor to the HMI
303 CUSTOM CUSTOM LOGIC - SEND BUS-A CURRENT READING FROM POWER MONITOR TO HMI Transfer the Current reading from the power monitor to the HMI
304 CUSTOM CUSTOM LOGIC - SEND BUS-A WATTS READING FROM POWER MONITOR TO HMI Transfer the Watts reading from the power monitor to the HMI
305 CUSTOM CUSTOM LOGIC - SEND BUS-A WATT-HR READING FROM POWER MONITOR TO HMI
Transfer the accumulated Watt-HR reading from the power monitor to
the HMI
306 CUSTOM CUSTOM LOGIC - SEND BUS-A VA-HR READING FROM POWER MONITOR TO HMI Transfer the VA-HR reading from the power monitor to the HMI
307 CUSTOM CUSTOM LOGIC - SEND BUS-B VOLTAGE READING FROM POWER MONITOR TO HMI Transfer the Voltage reading from the power monitor to the HMI
308 CUSTOM CUSTOM LOGIC - SEND BUS-B CURRENT READING FROM POWER MONITOR TO HMI Transfer the Current reading from the power monitor to the HMI
309 CUSTOM CUSTOM LOGIC - SEND BUS-B WATTS READING FROM POWER MONITOR TO HMI Transfer the Watts reading from the power monitor to the HMI
310 CUSTOM CUSTOM LOGIC - SEND BUS-B WATT-HR READING FROM POWER MONITOR TO HMI
Transfer the accumulated Watt-HR reading from the power monitor to
the HMI
17410 Attachment D - Sample Program Flowchart Page 12 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
311 CUSTOM CUSTOM LOGIC - SEND BUS-B VA-HR READING FROM POWER MONITOR TO HMI Transfer the VA-HR reading from the power monitor to the HMI
312 CUSTOM CUSTOM LOGIC - SEND MCC-A VOLTAGE READING FROM POWER MONITOR TO HMI Transfer the Voltage reading from the power monitor to the HMI
313 CUSTOM CUSTOM LOGIC - SEND MCC-A CURRENT READING FROM POWER MONITOR TO HMI Transfer the Current reading from the power monitor to the HMI
314 CUSTOM CUSTOM LOGIC - SEND MCC-A WATTS READING FROM POWER MONITOR TO HMI Transfer the Watts reading from the power monitor to the HMI
315 CUSTOM CUSTOM LOGIC - SEND MCC-A WATT-HR READING FROM POWER MONITOR TO HMI
Transfer the accumulated Watt-HR reading from the power monitor to
the HMI
316 CUSTOM CUSTOM LOGIC - SEND MCC-A VA-HR READING FROM POWER MONITOR TO HMI Transfer the VA-HR reading from the power monitor to the HMI
317 CUSTOM CUSTOM LOGIC - SEND MCC-B VOLTAGE READING FROM POWER MONITOR TO HMI Transfer the Voltage reading from the power monitor to the HMI
318 CUSTOM CUSTOM LOGIC - SEND MCC-B CURRENT READING FROM POWER MONITOR TO HMI Transfer the Current reading from the power monitor to the HMI
319 CUSTOM CUSTOM LOGIC - SEND MCC-B WATTS READING FROM POWER MONITOR TO HMI Transfer the Watts reading from the power monitor to the HMI
320 CUSTOM CUSTOM LOGIC - SEND MCC-B WATT-HR READING FROM POWER MONITOR TO HMI
Transfer the accumulated Watt-HR reading from the power monitor to
the HMI
321 CUSTOM CUSTOM LOGIC - SEND MCC-B VA-HR READING FROM POWER MONITOR TO HMI Transfer the VA-HR reading from the power monitor to the HMI
322 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 1 VFD phase A current.44283 47645
323 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 1 VFD phase B current.44284 47652
324 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 1 VFD phase C current.44285 47659
325 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Pump 1 VFD Trouble Alarm (remove from logic at later date if identical
to hard wired alarm)02289 04481 47666
326 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 VFD Overtemperature Alarm 02290 04483 47667
327 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 VFD Low DC Voltage Alarm 02291 04485 47668
328 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 VFD Output SCR Fail 02292 04487 47669
329 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 1 VFD Input Overvoltage 02293 04489 47670
330 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 2 VFD phase A current.44286 47671
331 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 2 VFD phase B current.44287 47678
332 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 2 VFD phase C current.44288 47685
333 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Pump 2 VFD Trouble Alarm (remove from logic at later date if identical
to hard wired alarm)02294 04491 47692
334 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 VFD Overtemperature Alarm 02295 04493 47693
335 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 VFD Low DC Voltage Alarm 02296 04495 47694
336 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 VFD Output SCR Fail 02297 04497 47695
337 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 2 VFD Input Overvoltage 02298 04499 47696
338 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 3 VFD phase A current.44289 47697
339 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 3 VFD phase B current.44290 47704
340 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 3 VFD phase C current.44291 47711
341 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Pump 3 VFD Trouble Alarm (remove from logic at later date if identical
to hard wired alarm)02299 04501 47718
342 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 VFD Overtemperature Alarm 02300 04503 47719
343 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 VFD Low DC Voltage Alarm 02301 04505 47720
344 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 VFD Output SCR Fail 02302 04507 47721
345 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 3 VFD Input Overvoltage 02303 04509 47722
346 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 4 VFD phase A current.44292 47723
347 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 4 VFD phase B current.44293 47730
348 SWS-C12C TRANSMITTER SIGNALS TEMPLATE LOGIC(SWS-C12C V1.02)Pump 4 VFD phase C current.44294 47737
349 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)
Pump 4 VFD Trouble Alarm (remove from logic at later date if identical
to hard wired alarm)02304 04511 47744
350 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 VFD Overtemperature Alarm 02305 04513 47745
351 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 VFD Low DC Voltage Alarm 02306 04515 47746
352 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 VFD Output SCR Fail 02307 04517 47747
353 SWS-C12F DISCRETE SIGNAL TEMPLATE LOGIC(SWS-C12F V1.10)Pump 4 VFD Input Overvoltage 02308 04519 47748
354 CUSTOM CUSTOM LOGIC - MODBUS+ MSTR READ FROM BUS-A POWER MONITOR
Read the Power Monitor electrical parameters that need to be
monitored.
355 CUSTOM CUSTOM LOGIC - MODBUS+ MSTR READ FROM BUS-B POWER MONITOR
Read the Power Monitor electrical parameters that need to be
monitored.
356 CUSTOM CUSTOM LOGIC - MODBUS+ MSTR READ FROM MCC-A POWER MONITOR
Read the Power Monitor electrical parameters that need to be
monitored.
357 CUSTOM CUSTOM LOGIC - MODBUS+ MSTR READ FROM MCC-B POWER MONITOR
Read the Power Monitor electrical parameters that need to be
monitored.
17410 Attachment D - Sample Program Flowchart Page 13 of 14 Aug 25, 2020
DR
A
F
T
Job No.Project Name
PLC Name
Programming Flow Chart
DO
02xxx
DI
04xxx
INT
07xxx
AO
42xxx
AI
44xxx
INT
47xxx
REGISTER
NUMBERCOMMENT
LOOP TAG
NUMBER
(DESC1)
EQUIPMENT NAME
(DESC2)
BLOCK
NUMBER
TEMPLATE
NAME TEMPLATE PAGE TITLE DESCRIPTION
REGISTER STARTING ADDRESS
MOD
358 CUSTOM CUSTOM LOGIC - MODBUS+ MSTR READ FROM PUMP 1 VFD
Read the Pump 1 VFD electrical parameters that need to be
monitored.
359 CUSTOM CUSTOM LOGIC - MODBUS+ MSTR READ FROM PUMP 2 VFD
Read the Pump 2 VFD electrical parameters that need to be
monitored.
360 CUSTOM CUSTOM LOGIC - MODBUS+ MSTR READ FROM PUMP 3 VFD
Read the Pump 3 VFD electrical parameters that need to be
monitored.
17410 Attachment D - Sample Program Flowchart Page 14 of 14 Aug 25, 2020
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-1
17410 Attachment E
Section 01810 Commissioning
PART 1 - GENERAL
1.1 SUMMARY
A. This section identifies the requirements for pre-commissioning and commissioning
activities for all electrical, mechanical, instrumentation, control and process equipment.
This section ties together the many activities defined in other Specifications sections that
are required to be performed and completed during pre-commissioning and commissioning
and provides the overall requirements for the pre-commissioning and commissioning
process.
B. Provide all personnel, tools, labor, equipment, materials, documentation, testing
piping, devices, and equipment for testing, pre-commissioning, and commissioning
activities. The CONTRACTOR shall provide proper planning, notification, scheduling, and
coordination for all activities.
1.2 RELATED WORK SPECIFIED UNDER OTHER SECTIONS:
A. The requirements of the following sections and divisions apply to the Work of this
section. Other sections and divisions of the Specifications, not referenced below, shall
also apply to the extent required for proper performance of this Work.
1. Section 01300, Contractor’s Construction Schedule and Reports
2. Section 01783, Equipment Service Manuals
3. Section 01811, Commissioning Dashboard
4. Section 01820, Training of OC SAN Personnel
5. Division 08710, Finish Hardware
6. Section 10400, Identifying Devices
7. Division 11, Equipment
8. Section 11910, Diesel-Fueled Standby Engine-Generator Set
9. Section 13500, Closed Circuit Television CCTV
10. Section 13700, Access Control and Alarm Monitoring System
11. Section 13850, Fire Alarm System
12. Division 14, Conveying System
13. Division 15, Mechanical
14. Section 16080, Electrical Testing
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-2
15. Division 16, Electrical, other applicable sections
16. Division 17, Instrumentation and Control
1.3 DEFINITIONS
A. Certificate of Proper Installation (COPI): A written report signed by a trained and
qualified representative of the manufacturer certifying that each equipment specified in
Divisions 8, 10, 11, 13, 14, 15, 16 and 17 is installed properly in accordance with the
manufacturer’s installation instructions.
B. Certificate of Proper Operation (COPO): A written report signed by a trained and
qualified representative of the manufacturer certifying that each equipment specified in
Divisions 8, 10, 11, 13, 14, 15, 16 and 17 is properly installed and lubricated, accurately
aligned, free from any undue stress imposed by connecting piping or anchor bolts, has
been operated under full load conditions and operates in accordance with specified
requirements.
C. Commissioning: All pre-operational, operational, functional, reliability and field
performance tests, including pre-ORT, ORT, FAT, RAT, and PAT, that demonstrate the
proper function, operation, performance and configuration of the equipment and systems.
D. Commissioning Dashboard: A spreadsheet tracking tool developed, used and
maintained by the CONTRACTOR, as defined in Section 01811, and shared with the
ENGINEER to track that status and progress of all pre-commissioning and commissioning
activities identified in this section and in Tables 1a and 1b.
E. Commissioning Package: A group of equipment, devices, and accessories that have
dependencies on one another, operate together to perform a function, will be pre-
commissioned and commissioned together, and will be tested as a system during
operational readiness testing (ORT), functional acceptance testing (FAT) and reliability
acceptance testing (RAT). All equipment installed, modified or connected under this
Contract (including connections to existing equipment) shall be part of a commissioning
package.
F. Functional Acceptance Test (FAT): Tests equipment and instrument operation and
shutdowns under load (in REMOTE MANUAL mode of operation) using process fluid
(water, air, etc.) to verify proper functionality. Tests equipment and systems in REMOTE
AUTOMATIC and AUTOMATIC modes of operation with software and water (as defined in
the procedure or Part 3) or other process fluid to simulate normal operating conditions.
Test automatic transfer switches with normal and standby power sources. Test medium-
voltage and low-voltage switchgear by simulating incoming voltage to the protective
devices. For non-process systems, test the functionality of the system using actual
conditions (i.e., fire alarm system, access control system, HVAC, battery chargers,
automatic transfer switches, uninterruptible power supplies, generators, etc.).
G. Gate Report: A report that documents the results of pre-commissioning and
commissioning and is accepted by the ENGINEER prior to the CONTRACTOR’s
authorization to proceed to the next phase of commissioning. See Part 1, Article entitled
“Gate Reports” of this section for content requirements.
H. Operational Readiness Test (ORT): Tests equipment, instrumentation, wiring,
hardware, and software without water or any other process fluid in the LOCAL, HAND and
REMOTE MANUAL modes of operation.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-3
I. Performance Acceptance Test (PAT): A test executed by OC SAN after substantial
completion to verify that the process system operates in accordance with the designed
minimum and maximum performance requirements.
J. Pre-Commissioning: All activities that are required to be completed prior to the start of
commissioning. This includes all equipment checks and testing, loop checks (witnessed
and unwitnessed) and the pre-commissioning Gate Report.
K. Reliability Acceptance Test (RAT): A test to check that the system can operate
continuously in the intended manner for an extended period without failure. During the
RAT, the system under test shall be operated within design parameters reflecting the day-
to-day operation of the facilities for an uninterrupted period.
L. System: A group of equipment, instruments, devices, and piping that is part of an
overall process, electrical distribution, or a portion thereof, and performs a specific function.
1.4 SUBMITTALS
A. Submit the following information in addition to instrument, device, and equipment
testing reports and submittals required in other Specifications sections:
1. Resumes for the Commissioning Coordinator and Commissioning Team Leaders.
2. Manufacturer Services: Submit a letter from the manufacturers (forty-five (45) days
prior to performing the service) stating that each proposed manufacturers’
representative who will perform services is qualified, trained and has experience
performing the required services.
3. FDT procedures
4. Final sample test and certification documentation forms
5. Commissioning Overview
a. Commissioning Plans for each commissioning package
b. Calibration:
(1) Credentials and certification of the person proposed by the
CONTRACTOR for calibration of all instruments.
(2) Sample calibration forms, showing pass/fail ranges, that will be used as a
template.
(3) Calibration documentation for test equipment. Calibration documentation
must be submitted and accepted by the ENGINEER prior to use of test
equipment and after each annual calibration.
c. Meeting minutes (via e-mail only, not as a construction submittal)
d. Schedule:
(1) Commissioning schedule with required updates
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-4
(2) Three (3)-week commissioning activity look ahead schedule with required
updates
6. Record Keeping System and Tracking Tools: Submit sample for acceptance and
updates on the required intervals the following tracking spreadsheets:
a. Lock-out and tag-out procedures
b. 480V and greater conductor testing/torquing/energization
c. Instrumentation, control and alarm circuit conductor testing
d. Wire tag/loop check
e. Instrumentation calibration
f. Manufacturer services
g. Electronic configuration files
h. Individual equipment service manuals
i. Post-energization electrical testing
7. Lock-out and Tag-out Procedures and Policies that will be used by the
CONTRACTOR during pre-commissioning and commissioning. Procedures shall be
updated to reflect any changes.
8. Gate Reports: Submit within thirty (30) days after completion of the last required
for the associated Gate Report.
B. Submit instrument, device, and equipment testing reports required in other
Specifications sections within thirty (30) days after completion of testing.
C. Final punch list items.
D. Final as-built drawings.
1.5 PROJECT COMMISSIONING GROUP
A. CONTRACTOR’S Project Commissioning Group
1. Assemble a Commissioning Group consisting of the Commissioning Coordinator,
Commissioning Team Leaders for ORT and FAT (see ENGINEER responsibilities
below for the maximum number of Commissioning Teams allowed), commissioning
team members, support staff, technical support personnel from the CONTRACTOR
and Subcontractor, CONTRACTOR’S Training Representative (in accordance with
Section 01820, Training of OC SAN Personnel), and separate leads for mechanical,
electrical and instrumentation.
2. CONTRACTOR’s Commissioning Teams shall perform commissioning activities
and procedures with the ENGINEER.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-5
3. Working with the Commissioning Coordinator, the mechanical, electrical and
instrumentation leads shall be responsible for confirming Work is complete and ready
for witnessed loop checks and commissioning, overseeing pre-commissioning and
troubleshooting activities, and verifying the resolution of punch list items and issues.
4. Commissioning Teams shall be available at the Work site during normal working
hours (eight (8) hours a day, five (5) days a week, except Saturdays, Sundays and OC
SAN holidays) and shall be available onsite within two (2) hours after being notified at
all other times. This team shall be equipped and always ready to provide emergency
repairs and make required adjustments and corrections to the equipment and systems
installed and modified by this Contract.
B. CONTRACTOR’s Commissioning Coordinator
1. Qualifications
a. The Commissioning Coordinator shall be [independent of the
CONTRACTOR and any of the suppliers, hired by the CONTRACTOR and]
accepted by the ENGINEER within sixty (60) days from the effective date of the
Notice to Proceed. The Commissioning Coordinator will be interviewed upon
acceptance of the Commissioning Coordinator’s resume as part of the acceptance
process. The Commissioning Coordinator shall be experienced in all activities
related to pre-commissioning and commissioning, including all facility operations,
tests, adjustments and measurements. The Commissioning Coordinator shall
have a minimum of [five (5)] [ten (10)] years of experience in operations and
commissioning of facilities of similar type, size, and capacity. The Commissioning
Coordinator shall be experienced in all aspects of planning, documentation,
testing, pre-commissioning, and commissioning.
2. Responsibilities:
a. Be authorized by the CONTRACTOR to manage, lead, schedule, and direct
the Commissioning Team and all testing, pre-commissioning and commissioning
activities.
b. Pre-Commissioning and Commissioning Plan and Documents:
(1) Develop and implement the Commissioning Plan.
(2) Update the Commissioning Plan and associated field copies with any
changes that occur.
(3) Review and finalize pre-ORT, ORT and FAT procedures provided by OC
SAN in Attachment A.
(4) Develop pre-ORT, ORT, FAT and RAT procedures for equipment that
have not been provided by OC SAN.
(5) Review and finalize test and certification documentation forms provided by
OC SAN so they are specific to each item of equipment and system
installed, modified, or rewired under this Contract. The CONTRACTOR
shall request forms from the ENGINEER. The CONTRACTOR shall meet
with the ENGINEER to review all final forms and submit them for
acceptance.
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-6
(6) Develop test and certification documentation forms specific to each
equipment, instrument, and device that have not been provided by OC
SAN that were installed, modified, or rewired under this Contract. The
CONTRACTOR shall meet with the ENGINEER to review all final forms
and submit them for acceptance.
(7) Develop test documentation forms specific to each item of equipment that
have not been provided by OC SAN that were installed, modified, or
rewired under this Contract.
(8) Update the Commissioning Dashboard in accordance with Specifications
Section 01811, Commissioning Dashboard.
(9) Develop and utilize a record keeping system and tracking tools.
c. Develop and utilize pre-startup checklists. Schedule:
(1) Develop and update a detailed pre-commissioning and commissioning
schedule and incorporate it into the Construction Schedule.
(2) Develop and update a weekly Three-Week Look-Ahead schedule during
the pre-commissioning and commissioning phases.
d. Manufacturer Services:
(1) Schedule and coordinate manufacturer’s services required in accordance
with Manufacturer’s Field Services in this section and the individual
equipment Specifications sections.
(2) Notify the ENGINEER when any manufacturer services are to be
performed.
e. Pre-Commissioning and Commissioning:
(1) Provide technical oversight during the pre-commissioning and
commissioning activities.
(2) Be responsible for preparing pre-commissioning and commissioning
submittals.
(3) Provide all documentation that equipment, instrumentation and devices
are ready for testing.
(4) Track NETA acceptance testing required in accordance with
Specifications Section 16080, Electrical Testing.
(5) Coordinate pre-commissioning tests, pre-commissioning activities, and
loop checks.
(6) Coordinate commissioning activities.
(7) Support OC SAN with troubleshooting during RAT if requested by the
ENGINEER and coordinate any repairs. OC SAN will direct operations
during RAT to protect public health, safety and water quality.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-7
(8) Provide all gate reports, per commissioning package, after the pre-
commissioning phase and each phase of commissioning. The report shall
include the collection of data and documentation during that portion of the
Work as described in Article entitled “Gate Reports” herein.
f. OC SAN Training:
(1) Formally request training facilities for the classroom portion of the operator
and maintenance training thirty (30) days prior to use.
(2) Oversee and coordinate the activities and duties of the CONTRACTOR’s
Training Representative.
g. Equipment Service Manuals:
(1) Oversees the submittal process of the Equipment Service Manuals, which
are required in accordance with Specifications Section 01783, Equipment
Service Manuals.
h. Meetings:
(1) Conduct monthly commissioning meetings from the date of ENGINEER’s
acceptance of the Commissioning Coordinator through the start of
Unwitnessed Loop Checks. The meeting shall cover the Commissioning
Plan development, pre-commissioning progress and activities, and
preparation of loop checks. The meeting shall be documented with
meeting minutes. Draft meeting minutes shall be submitted to the
ENGINEER within seven (7) days after the meeting for review and
comment. Final meeting minutes shall be submitted within fourteen (14)
days after the meeting.
(2) Conduct [bi-weekly] [weekly] commissioning meetings from the start of
Unwitnessed Loop Checks through the completion of the Reliability
Acceptance Test. The meeting shall cover the Three-Week Look-Ahead
schedule and track actions and punch-list items. The meeting shall be
documented with meeting minutes. Draft meeting minutes shall be
submitted to the ENGINEER within seven (7) days after the meeting for
review and comment. Final meeting minutes shall be submitted within
fourteen (14) days after the meeting.
(3) Conduct daily kick-off meetings in the morning (discuss the activities and
sequencing planned for the day) and debrief meetings at the end of the
day (discuss progress, issues and concerns) when pre-commissioning
witnessed loop checks and commissioning activities are being performed.
These meetings shall be brief and last approximately fifteen (15) minutes.
C. CONTRACTOR’s Commissioning Team Leader
1. Qualifications
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-8
a. Resumes of the Commissioning Team Leaders shall be submitted for
acceptance. The Commissioning Team Leader shall be accepted by the
ENGINEER during the acceptance process of the Commissioning Coordinator.
The Commissioning Team Leader shall have experience on at least three projects
performing equipment startup and commissioning activities.
2. Responsibilities:
a. Lead and direct the Commissioning Team in the field during the ORT and FAT
procedures for their respective team and sign the completed procedure steps.
b. The Commissioning Coordinator may serve as a Commissioning Team Leader
for one of the Commissioning Teams provided all Commissioning Coordinator
duties are being successfully performed in a timely manner.
D. ENGINEER
1. Responsibilities
a. Inspect equipment and wiring and observe the following tests for compliance
with the Contract Documents.
(1) Factory Demonstration Test – Part 2 (no more than one FDT at a time)
(2) Witnessed Loop Checks. The CONTRACTOR shall base their bid on
having no more than two witnessed loop check teams at a time when no
commissioning activities are being performed or one witnessed loop check
team when commissioning activities are being performed.
b. Complete Permission to Energize Electrical Equipment Forms and authorize
the initial energization of electrical equipment.
c. Observe the following tests for compliance with the Contract Documents. The
CONTRACTOR shall base their bid on having no more than [one team] [two
teams] to perform any combination of commissioning activities (electrical
equipment energization, pre-ORT, ORT, FAT and RAT) at a time.
(1) Electrical Equipment Energization
(2) Pre-ORT
(3) Operational Readiness Test
(4) Functional Acceptance Test
(5) Reliability Acceptance Test
(6) [Performance Acceptance Test]
d. Furnish and install process control software [unless specified in Section
17410, Programming by Contractor] and download the process control software
starting with ORT.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-9
e. Provide labor and services to inspect and support the integration of OC SAN-
furnished process control software with the Project equipment, instrumentation,
devices, and control system during all commissioning phases.
f. Provide operators for the RAT.
g. Provide classroom facilities for operator and maintenance training.
h. Review of all test data and results.
1.6 FACTORY DEMONSTRATION TEST (FDT) PROCEDURES
A. Develop and submit step-by-step written procedures for the systematic testing of
pumps, process equipment, mechanical equipment, electrical equipment, and control
panels at the factory where required in individual Specifications sections. The submittal
shall include the following:
1. The setup requirements for the test and the steps required to complete the test.
2. A description of what is being verified at each individual step of the test with the
associated passing criteria.
3. A list of all test equipment to be used for the tests.
4. When process testing of equipment is required, a diagram shall be provided
showing the equipment, test setup arrangement, equipment and piping
interconnections, and any special test equipment.
5. Test schedule.
6. The FDT checkout procedures shall be reviewed and approved by the respective
equipment manufacturers and be acceptable to the ENGINEER. FDT procedures shall
be accepted by the ENGINEER 30 days prior to FDT1.
B. FDT 1 – Factory Demonstration Test – Part 1: The purpose of this test is for the
CONTRACTOR to inspect and witness the testing of the Contract equipment at the
manufacture’s facility in accordance with.an accepted procedure.
C. FDT 2 – Factory Demonstration Test – Part 2: The purpose of this test is for the
CONTRACTOR and ENGINEER to inspect and witness the testing of the Contract
equipment at the manufacture’s facility in accordance with an accepted procedure.
1.7 COMMISSIONING OVERVIEW AND PLANS
A. Provide a commissioning overview and a separate Commissioning Plan for each
commissioning package. These items shall be submitted separately for review and
acceptance by the ENGINEER.
B. Once the ENGINEER has accepted a Commissioning Plan, the Commissioning
Coordinator shall reproduce the plans in sufficient number for the Commissioning
Coordinator’s purposes and provide two (2) hard copies of the plan in the field for the
CONTRACTOR’s commissioning team and the ENGINEER to use. One copy will be used
by the field staff and one copy (master) will be used by OC SAN’s programming staff. The
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-10
plans shall be kept up to date on a regular basis. No Work, as described in this section,
shall begin until the Commissioning Plan has been accepted by the ENGINEER.
C. A Commissioning Overview submittal shall be provided and shall include the following:
1. Tab 1 - Staff
a. Organization chart of the Commissioning Team for conducting the pre-
commissioning and commissioning activities.
b. Description of Commissioning Team members relevant experience on similar
projects, their role on each of these projects, and a list of three (3) references with
contact information (e-mail and phone numbers).
c. Roles and responsibilities of Commissioning Team members.
d. Email and cell phone numbers for the Commissioning Team members. The
ENGINEER shall be informed of any change in commissioning staff or contact
information through the duration of Pre-Commissioning and Commissioning.
2. Tab 2: List of commissioning packages
a. The CONTRACTOR shall develop a list of commissioning packages. The
CONTRACTOR shall include redline P&IDs to better define which equipment is
part of a commissioning package when a large system is constructed and
commissioned in phases or when equipment cannot easily be defined by a system
description (e.g., a sump pump system, supply or exhaust fan, or plant air system
is being commissioned with a larger system).
D. A Commissioning Plan shall be provided for each commissioning package and shall
include the following:
1. Tab 1: Calibration Forms
a. Develop instrumentation calibration forms that include calculated calibration
values and acceptable plus/minus calibration ranges in engineering units for each
test point.
2. Tab 2: Tracking Reports
a. Include tracking reports as specified in Part 1, Article entitled “Record Keeping
System and Tracking Tools” with all information filled out, except for information
under the tracking columns. Only tasks to be completed in the future shall be left
blank.
3. Tab 3: Pre-Test Checklist
a. Develop a checklist for all equipment in a commissioning package that must
be verified prior to testing. The purpose of this checklist is to verify that all valves,
breakers, motors, etc. are in their proper position (i.e., open, closed, energized,
de-energized, etc.) to ensure a safe and efficient test. The CONTRACTOR shall
submit a separate checklist for ORT and FAT testing for each commissioning
package. Each instrument, device, and piece of equipment shall be referred to by
its English description and by its tag number.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-11
4. Tab 4: Testing Piping Plan
a. The Contractor shall identify all water used in each test, and how, where, and
at what conditions it is supplied and discharged. Testing piping shall be provided
as necessary to operate equipment at all test conditions. The CONTRACTOR shall
develop all testing piping plans required to perform FAT.
(1) [The following is the supply point for water and the available flow
conditions:
Supply Point of
Connection/Drawing
Test
Procedure
Available
Supply Flow
(gpm)
Available
Pressure
(psig)
(2) The following is the discharge point and the maximum discharge
flow:]
Discharge Point of
Connection/Drawing
Test Procedure Maximum Discharge
Flow (gpm)
b. For each testing pipe, the plan shall include the required flow criteria, sizing
calculations, plan drawings, redlines of P&IDs, and all piping details required for
testing. The plan shall also include what new and existing mechanical equipment
will be manipulated during testing.
c. The testing piping system shall include the following key components:
(1) A flow metering instrument when flow is needed for measurement and
control, and the controlling flow meter is bypassed by the testing piping.
The flow metering instrument may be an orifice plate, magmeter, insertion
magmeter, ultrasonic or another device proposed by the CONTRACTOR
and accepted by the ENGINEER. All instruments shall be factory or field
calibrated. The full range accuracy of the flow metering device shall be
plus or minus one (1) percent.
(2) A throttling valve that creates a back pressure on the pumps to replicate
the full and reduced performance/capacity operating range of the
equipment if required.
(3) Necessary piping connections and accessories such as air release valves,
vacuum relief valves, pressure control valves, drains, and instrumentation
connections. Accessories shall be shown on the testing piping plan and
redlined P&IDs.
5. Tab 5: Pre-ORT Procedures
a. Develop Pre-ORT testing checklist to verify valves, gates, motors and
appurtenances are ready to test as described in the paragraph entitled
“Commissioning – Phase 2, Pre-ORT Activities” in Part 3 of this section.
b. Standard pre-check procedures for vendor packaged equipment.
DR
A
F
T
I I
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-12
6. Tab 6: Packaged Equipment ORT and FAT Procedures:
a. Use the vendor’s standard testing procedures for testing their packaged
equipment during ORT and FAT. The test procedures shall demonstrate
equipment performance, all operational requirements, all modes of operation (local
and automatic) and all interlocks. The following information shall be provided with
the vendor’s ORT and FAT procedures:
(1) Control strategy
(2) Setpoint list
(3) Shutdown list
(4) Alarm list
b. Develop ORT and FAT procedures to supplement the vendor’s standard
testing procedures when the vendor’s procedures do not cover the overall system
operations and commissioning package interfaces, interlocks and shutdowns with
other systems.
c. Develop ORT and FAT procedures for packaged equipment and systems
when the manufacturer does not have a standard testing procedure. The ORT and
FAT procedures shall conform to the ORT and FAT procedures described in the
tabs below. The CONTRACTOR shall have the respective equipment
manufacturer review and approve the procedure and provide a written letter of
acceptance in this tab.
d. If there is no packaged equipment in this Project, provide a placeholder for this
tab and indicate that it is “Not Applicable.”
7. Tab 7: ORT Procedures:
a. OC SAN has developed a select number of the ORT procedures for the Project
in Attachment A. CONTRACTOR shall review and finalize these procedures based
on the actual equipment and systems being provided.
b. Develop step-by-step procedures to systematically test every control circuit for
all equipment, instruments, devices, and wiring installed or modified under this
Contract where OC SAN has not provided a procedure. A procedure shall be
submitted for each piece of equipment with a control or I/O circuit. The procedure
shall test equipment in LOCAL, HAND, and REMOTE MANUAL modes of
operation. CONTRACTOR shall match the format of the procedures provided by
OC SAN, which includes a description of the action to be performed and
anticipated result, the register number for the associated PLC input and output
point to be verified, action to be verified with comments, and signatures for the
CONTRACTOR and ENGINEER for each procedure step. Procedures shall use
the appropriate testing method for instruments and devices, as specified in Part 3,
Article entitled “Commissioning – Phase 3, ORT Activities” of this section, to verify
that the circuit is operating properly and connected to the correct device. The
following is a typical list of equipment or systems that needs a procedure
developed:
(1) HVAC systems
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-13
c. ORT procedures shall verify the following:
(1) I/O signals to/from the field device, motor starters or control panels,
through all cabling, to the PLC and HMI and the application software
properly operates.
(2) Proper installation, operation and adjustment of all devices,
instrumentation, and equipment on a loop by loop and component by
component basis. Functionality shall be checked from the primary element
in the field through all cabling to the PLC and HMI.
(3) Proper operation of equipment controls, devices, and indicating lamps.
(4) All hardwired interlocks properly shutdown the equipment.
(5) All alarms are triggered at the HMI.
(6) All status signals are monitored at the HMI.
d. The electrical ORT procedures shall include the following:
(1) Steps to test and check the LOCAL mode of operation, verify all required
switching scenarios and functions, and verify that precluded switching
scenarios do not occur.
(2) Methodology for supplying temporary power (when required).
(3) Steps to coordinate administrative controls of Project electrical equipment
that interfaces with existing OC SAN electrical equipment to ensure that
inadvertent energization of existing OC SAN equipment does not occur.
e. Provide a list of all test equipment that will be used to perform each test.
8. Tab 8: Pre-FAT Procedures
a. In REMOTE MANUAL, this procedure shall test the functionality of level
instruments (verify operation from minimum to maximum level) and flow
instruments with water, operation of gates with maximum water level upstream
side, each water shutdown interlock (i.e., pump shuts down on high discharge
pressure when discharge valve is throttled closed), and any other tests that require
water to verify proper equipment and instrument operation prior to FAT. The
shutdown interlocks are described in Commissioning – Phase 3, FAT Activities in
Part 3, properly performs the function and verify the shutdown setpoint is the
correct setpoint to properly protect the equipment and system.
b. OC SAN has developed a select number of pre-FAT procedures for the Project
in Attachment A. The CONTRACTOR shall review and finalize these procedures
based on the actual equipment and systems being provided.
DR
A
F
T
---
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-14
c. The CONTRACTOR shall develop step-by-step procedures to systematically
test the functionality of select equipment and instruments installed under this
Contract with water where OC SAN has not provided a procedure. The procedures
shall verify the equipment and instrument operation with water. The procedures
shall describe the initiation of shutdowns and the expected results that are to be
verified. A procedure shall be submitted for each equipment and instrument
requiring a pre-FAT. The CONTRACTOR shall match the format of the procedures
provided by OC SAN.
8. Tab: FAT Procedures
a. OC SAN has developed a select number of FAT procedures for the Project in
Attachment A. CONTRACTOR shall review and finalize these procedures based
on the actual equipment and systems being provided.
b. Develop step-by-step procedures to systematically test the functionality of all
equipment and systems installed or modified under this Contract where OC SAN
has not provided a procedure. The procedure shall test equipment in LOCAL
AUTO and REMOTE AUTOMATIC modes of operation. The procedure shall test
all equipment and systems in REMOTE AUTOMATIC and AUTO modes to verify
that the equipment and systems operate as described in the control strategies of
the Specifications sections. The procedures shall describe the initiation of
shutdowns and the expected results that are to be verified and shall test all startup
and shutdown conditions for each piece of equipment and the system or process
train to test the complete program functionality. The procedure shall include all
testing scenarios. A procedure shall be submitted for each equipment and system.
A system FAT shall be provided for all equipment that function together with
programming interlocks. The CONTRACTOR shall match the format of the
procedures provided by OC SAN. The following is a typical list of equipment or
systems that needs a procedure developed procedures the:
(1) HVAC systems
(2) Fire alarm systems
(3) Access control systems
(4) Public address system
(5) Closed circuit television system
(6) Telephone
(7) Elevators
(8) Cranes and hoists
c. Performance testing of each individual item of mechanical, electrical and
instrumentation equipment shall be performed to duplicate the operating
conditions described in the Contract Documents, as closely as possible.
d. System tests shall be designed to duplicate operating conditions of the system
as described in the Contract Documents, as closely as possible.
DR
A
F
T
---
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-15
e. Provide a list of all test equipment that will be used to perform each test.
f. The electrical FAT procedures shall include the following:
(1) Steps to test the REMOTE (automatic and PLC controls) mode of
operation, verify all required switching scenarios and functions, verify that
precluded switching scenarios do not occur, and proper functionality of all
interlocks.
(2) Methodology for supplying temporary power (when required).
(3) Steps to coordinate administrative controls of Project electrical equipment
that interfaces with existing OC SAN electrical equipment to ensure that
inadvertent energization of existing OC SAN equipment does not occur.
g. The control strategies describe the general operation, interlocking and
sequencing of a system, but do not describe every shutdown and logical sequence
in exact detail. For procedures that reflect OC SAN programming, the
CONTRACTOR shall allow the ENGINEER to revise the FAT procedures based
on the final programming to incorporate equipment interlocks, shutdowns, and
operating sequences. Provides that reflect the CONTRACTOR’s programming
shall be revised to reflect the final program that will be tested during FAT. These
revisions may include formal revisions to the procedure or ad-hoc revisions in the
field as required.
9. Tab 10: RAT Procedures
a. OC SAN will develop and execute the RAT procedures for the Project.
b. Incorporate these procedures into the Commissioning Plan for each
commissioning package. During the RAT procedures, the equipment and systems
will be operated under various scenarios of normal operating conditions. Where
possible the system will be tested to verify dry and wet weather design operating
conditions and confirm system capacity. Failures will be simulated to test the fail-
over logic, equipment shutdown sequencing, and equipment startup sequencing.
c. CONTRACTOR does not need to be present unless required in an equipment
Specifications section, but shall be available to troubleshoot and repair when
requested.
10. Tab 11: PAT Procedures
a. OC SAN will develop and execute the PAT procedures for the Project.
b. Incorporate these procedures into the Commissioning Plan for each
commissioning package. During the PAT procedures, the equipment and systems
will be operated under different operating conditions to verify dry and wet weather
design operating conditions and confirm system capacity.
c. CONTRACTOR does not need to be present unless required in an equipment
Specifications section, but shall be available to troubleshoot and repair when
requested.
11. Tab 12: Drawings
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-16
a. Include the following drawings associated with the commissioning package.
Markup the drawings showing the limits of Work associated with the
commissioning package.
(1) Single line diagrams
(2) P&IDs
(3) Control panel shop drawings
(4) Control schematics from equipment shop drawings
(5) Accepted loop drawings
1.8 SCHEDULE
A. The Commissioning Coordinator shall develop a commissioning schedule for pre-
commissioning and commissioning activities for all equipment and systems. The schedule
shall include OC SAN personnel training. The pre-commissioning schedule shall be
organized by remote input/output (RIO) panel and equipment. The commissioning
schedule shall be organized by commissioning package and shall show the chronological
order of all commissioning activities by test. The commissioning schedule shall incorporate
the following restrictions in addition to the requirements identified in Tables 1a and 1b:
1. Witnessed loop checks shall not be performed for an RIO panel until all field and
panel wire terminations associated with that RIO panel have been completed.
2. The electrical equipment energization process shall be complete and written
authorization to energize shall be provided by the ENGINEER prior to the electrical
equipment being allowed to be used for the associated equipment ORTs.
3. A commissioning package Pre-ORT shall be successfully performed before
moving to ORT.
4. ORT procedures shall not be performed until:
a. All witnessed loop checks have been successfully performed for all panels
associated with the commissioning package ORT(s)
b. Required electrical distribution equipment is energized
c. A Pre-ORT has been successfully performed for the commissioning package
d. All pre-ORT punch list items have been signed off by the ENGINEER
e. The commissioning package pre-commissioning gate report has been
accepted by the ENGINEER.
5. FAT shall not be performed until all ORT procedures and requirements for the
commissioning package and pre-FAT punch list items have been signed off by the
ENGINEER.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-17
6. RAT shall not be performed until all FAT procedures and requirements for the
commissioning package and pre-RAT punch list items have been signed off by the
ENGINEER.
B. CONTRACTOR’s Baseline Construction Schedule as specified in Division 01 of the
Specifications shall incorporate the commissioning schedule.
C. The commissioning schedule shall show the start date, duration and completion date
of each pre-commissioning and commissioning activity. The schedule shall include FDT,
COPI, NETA testing, Unwitnessed and Witnessed Loop Checks, electrical equipment
energization, Pre-ORT, ORT, FAT, RAT, and COPO, as a minimum.
D. The commissioning schedule shall include all operations and maintenance training
activities.
E. The schedule shall include pre-commissioning and commissioning submittal dates and
OC SAN review and acceptance time for each submittal prior to moving to the next phase
of pre-commissioning and commissioning.
F. Within sixty (60) days of the ENGINEER’s acceptance of the Commissioning Overview
submittal and all Commissioning Plans and ninety (90) days prior to any pre-commissioning
and commissioning activity, the CONTRACTOR shall integrate the schedule into the
Construction Schedule and submit a Construction Schedule revision for review by the
ENGINEER as specified in Specifications Section 01300, Contractors Construction
Schedule and Reports.
G. The commissioning schedule shall be updated monthly in accordance with
Specifications Section 01300, Contractors Construction Schedule and Reports, indicating
schedule changes and which activities have been successfully completed.
H. Three-Week Look-Ahead Schedule
1. Develop a three-week look-ahead schedule, that is updated on a weekly basis,
starting three (3) weeks before the first unwitnessed loop check is performed through
the completion of the last RAT.
1.9 RECORD KEEPING SYSTEM AND TRACKING TOOLS
A. The Commissioning Coordinator shall develop and update a record keeping system to
document compliance with the requirements of this Specifications section and the other
Specifications sections for pre-commissioning and commissioning activities. The recording
keeping system and tracking tools shall use different colors or separate columns to track
acceptance by the CONTRACTOR and acceptance by the ENGINEER. The
CONTRACTOR shall make the recording keeping system and tracking tools available to
the ENGINEER at all times and shall provide the ENGINEER weekly updates of all record
keeping systems and tracking tools from the point when information is first logged until all
activities are complete. The recording keeping system shall be submitted for ENGINEER’S
acceptance prior to their use.
B. Conduct a workshop with the ENGINEER to review their approach to the record
keeping system and tracking tools prior to implementation. The workshop shall also discuss
electrical equipment energization and permission to energize tracking as part of the
tracking spreadsheets and the Commissioning Dashboard.
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-18
C. The following tracking spreadsheets shall be developed as a minimum for the entire
project. The tracking spreadsheets shall include a commissioning package column for
sorting and filtering. The spreadsheets shall be submitted with the monthly progress report
until the first pre-commissioning Gate report is submitted. After the pre-commissioning
Gate report is submitted, commissioning package tracking spreadsheets shall be
submitted on a bi-weekly basis.
1. Lock-out and Tag-out Procedures: Tracks the lock-out and tag-out procedure
description, acceptance date, commissioning package, and comments.
2. 480V and Greater Conductor Testing/Torquing/Energization: Tracks the cable tag,
commissioning package, equipment fed description, equipment fed tag, name of
electrical equipment the cable is being fed from (switchgear, MCC, panelboard, etc.),
source switchgear/MCC cubicle tag or panel circuit number, continuity check for each
conductor, insulation resistance value for each conductor, source end information
(performed by (CONTRACTOR), completion date, checked by (ENGINEER), torque
value for each conductor and comments), and load end information (performed by
(CONTRACTOR), completion date, checked by (ENGINEER), torque value for each
conductor and comments). Include a NETA testing complete column for medium-
voltage cables and cable bus. Also track the ENGINEER’s permission to energize date
for each circuit.
3. Instrumentation, Control and Alarm Circuit Conductor Testing: Tracks the cable
tag, commissioning package, fed from description and tag, fed to description and tag,
continuity check for each conductor, and insulation resistance value for each
conductor.
4. Wire Tag/Loop Check: Tracks the loop drawing number, loop drawing title, RIO
panel number, commissioning package, Unwitnessed Loop Check information (check
by and check date), Wire Tag Check information (check by, check date and comments
(ENGINEER)), and Witnessed Loop Check information (check by, check date and
comments (CONTRACTOR and ENGINEER)).
5. Instrumentation Calibration: Tracks the instrumentation tag, description, calibration
method, completion of calibrations, and commissioning package.
6. Manufacturer Services (tracks the following):
a. Completion of training plans, COPI, COPO, training of OC SAN personnel, and
commissioning package.
b. Submittal of a letter stating that the proposed manufacturers’ personnel are
qualified, trained and have experience performing the required services for all
equipment, instruments and devices that require manufacturer services.
7. Electronic Configuration File: Tracks the equipment tag, description,
commissioning package, and the submittal date of electronic native files with software,
and PDF printouts of configuration settings highlighting changes to default settings.
PDF shall be searchable.
8. Individual Equipment Service Manuals: Track the Specifications section,
equipment description, equipment loop tag numbers (instrument, mechanical,
electrical, etc.), commissioning package, acceptance date, and comments.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-19
9. Post-Energization Electrical Testing: Tracks the Specifications section and article,
test description, commissioning package, date when test is required, completion date
and comments.
D. The Commissioning Coordinator shall be responsible for setting up and updating a
Commissioning Dashboard to track the completion of all pre-commissioning and
commissioning activities. This dashboard shall be used to verify all items are complete
prior to moving to the next phase. The CONTRACTOR may use the Commissioning
Dashboard provided by OC SAN as defined in Section 01811, Commissioning Dashboard,
or may use its own tracking tool. If the CONTRACTOR uses its own tool, it shall be
submitted for ENGINEER’s acceptance prior to its use.
1.10 GATE REPORTS
A. Submit Gate Reports for each commissioning package to the ENGINEER for
acceptance to continue through the Commissioning process. Gate Reports are a collection
of all test reports, test data, certificates and forms for all equipment, instruments and
systems, that are produced during the pre-commissioning and commissioning phases for
each commissioning package. The Commissioning Coordinator is responsible for
producing these reports.
B. Pre-commissioning Gate Report
1. The Pre-Commissioning Gate Report shall include the following:
a. Tab 1 – Completion Statement: A formal statement that the CONTRACTOR
has completed the following requirements and is ready to move to the next phase
of commissioning:
(1) All requirements and punch list items associated with pre-commissioning.
(2) RFIs and responses up to date and all approved changes complete
associated with the Work
(3) Tags for equipment and instrument are properly installed
(4) All electrical equipment, devices, instruments, enclosures, pull boxes, field
control panels and control panels and secure all panel and wire covers
associated with the loop checks have been inspected and cleaned.
(5) Electrical rooms are clean and all construction work in the electrical room
is complete (Wiring may be remaining for equipment not being energized).
b. Tab 2 – Pre-commissioning Activities:
(1) An index of pre-commissioning submittals indicated in Table 1a and
specified in other Specifications sections that are required to be complete
during pre-commissioning, with the associated accepted submittal
number. At a minimum, the index shall include the following list with a “not
applicable (N/A)” for any submittal that is not required for the associated
commissioning package:
(a) CONTRACTOR’s lock-out tag-out and safety procedures
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-20
(b) Factory Demonstration Test procedures
(c) Factory performance tests
(d) Factory Demonstration Test - Part 1 Report (unwitnessed)
(e) Factory Demonstration Test - Part 2 Report (Witnessed)
(f) Electrical system analyses and measurements information (Section
16431)
(g) Mechanical alignment reports
(h) Metallurgical test reports
(i) Pressure test reports
(j) Electrical equipment tests (Section 16080 and Div. 16)
(k) Motors tested by CONTRACTOR (Section 16080)
(l) Conductor test reports
(m) Conductor torque logs
(n) EID Data (Manufacturer and Model Number)
(o) Approval of Section 17410, Programming by Contractor, Step 4 –
Bench Test
(p) Operating permits
(q) Operator & Maintenance Training Plan
(r) All draft individual equipment service manuals (Identify submittals in
Individual Equipment Service Manuals Tracking Report)
(2) This tab shall also include the following completed tracking reports as
specified in Part 1, Article entitled “Record Keeping System and Tracking
Tools” of this section. Include a printout of the Commissioning Dashboard:
(a) CONTRACTOR’s Lock-Out and Tag-Out Procedures Tracking
Report
(b) 480V and Greater Conductor Testing/Torquing/Energization Tracking
Report
(c) Instrumentation, Control and Alarm Circuit Conductor Tracking
Report
(d) Manufacturer Services Tracking Report showing completion of
training plans
(e) Individual Equipment Service Manuals Tracking Report
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-21
c. Tab 3 – Instrumentation Calibrations: The completed Instrumentation
Calibration Tracking Report as specified in Part 1, Article entitled “Record Keeping
System and Tracking Tools” of this section. All instrument calibrations shall be
complete except instruments on packaged equipment. Completed and signed
instrument calibration forms and factory calibration certificates. Documentation
shall be grouped for each instrument with the commissioning package
Instrumentation Checklist, sorted in ascending order of the loop number (15L-101,
15L-102, 15M-100…), showing that all documentation has been completed.
d. Tab 4 – Configuration Files: A PDF printout of the configuration files
highlighting all changes from the standard default configuration, including any
jumper or internal switch settings, for every device, instrument or piece of
equipment (i.e., valve actuators, gate actuators, analyzers, level instruments,
pressure transmitters, indicators, VFDs, soft starters, etc.) with user defined
settings. PDF shall be searchable. Electronic configuration files in their native
format with the associated software to open, view and modify the native file shall
also be provided. The Electronic Configuration File Tracking Report as specified
in Part 1, Article entitled “Record Keeping System and Tracking Tools” of this
section showing that all configuration files have been provided.
e. Tab 5 – COPI: All manufacturer certificates of proper installation. The
Manufacturer Services Tracking Report as specified in Part 1, Article entitled
“Record Keeping System and Tracking Tools” of this section shall be provided
showing that all COPIs have been performed.
f. Tab 6 – Wire Tag/Witnessed Loop Check: The completed Wire Tag/Loop
Check Tracking Report, as specified in Part 1, Article entitled “Record Keeping
System and Tracking Tools” of this section, with CONTRACTOR and ENGINEER
initials on the tracking report and highlighted and signed off loop drawings.
g. Tab 7 – Redlined Drawings: Up to date redlined drawings:
(1) Redlined single line diagrams
(2) Redlined P&ID’s.
(3) Redlined loop drawings signed by the ENGINEER.
(4) Redlined schematics / control diagrams
(5) Redlined control panel drawings
(6) Redlined wiring drawings
C. Commissioning – Phase 1 Gate Report, Electrical Equipment Energization
1. At a minimum, the Commissioning – Phase 1 Gate Report shall include the
following:
a. Tab 1 – Completion Statement: A formal statement that the CONTRACTOR
has completed all requirements and punch list items associated with this
commissioning phase and is ready to move to the next phase of commissioning.
b. Tab 2 – ORT: Signed and completed ORT procedures.
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-22
c. Tab 3 – FAT: Signed and completed FAT procedures.
d. Tab 4 – COPO: All manufacturer certificates of proper operation, when
required for this phase. The Manufacturer Services Tracking Report as specified
in Part 1, Article entitled “Record Keeping System and Tracking Tools” of this
section shall be provided showing that all electrical COPOs have been provided.
e. Tab 5 – Configuration Files: A PDF printout of the configuration file highlighting
all changes from the standard default configuration, including any jumper or
internal switch settings, for every device, instrument or piece of equipment (i.e.,
automatic transfer switches, protective relays, battery chargers, power monitors,
etc.) with user defined settings. PDF shall be searchable. Electronic configuration
files in their native format with the associated software to open, view and modify
the native file shall also be provided. The Electronic Configuration File Tracking
Report as specified in Part 1, Article entitled “Record Keeping System and
Tracking Tools” of this section showing any revised or new configuration files that
have been provided.
f. Tab 6 – Permission to Energize: Completed permission to energize equipment
forms for all electrically powered equipment and signed and completed motor pre-
energization forms for all motors above 3 horsepower. This form shall be signed
by the CONTRACTOR and the ENGINEER prior to equipment energization
indicating that all pre-energization activities are completed.
g. Tab 7 – Post-Energization Electrical Tests: Completed and signed test reports.
h. Tab 8 – Redlined Drawings: Up to date redlined drawings:
(1) Redlined single line diagrams
(2) Redlined P&ID’s
(3) Redlined loop drawings signed by the ENGINEER
(4) Redlined schematics and elementary diagrams
(5) Redlined control panel drawings
(6) Redlined wiring drawings
D. Commissioning – Phase 2 Gate Report, Pre-ORT
1. At a minimum, the Commissioning – Phase 2 Gate Report shall include the
following:
a. Tab 1 - Completion Statement: A formal statement that the CONTRACTOR
has completed all requirements and punch list items associated with this
commissioning phase and is ready to move to the next phase of commissioning.
b. Tab 2 – Pre-ORT: Pre-ORT activities checklist documenting activities
performed with their results.
c. Tab 3 – Vibration Tests: Mechanical equipment vibration test results.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-23
d. Tab 4 – Motor Tests: Uncoupled motor test results.
e. Tab 5 – Packed Equipment Pre-Check List: Manufacturer pre-check test
results for packaged equipment (if applicable).
f. Tab 6 – Packaged Equipment Instrumentation Calibration: Completed and
signed instrument calibration forms for vendor instruments (if applicable).
E. Commissioning – Phase 3 Gate Report, ORT and FAT
1. At a minimum, the Commissioning – Phase 3 Gate Report shall include the
following:
a. Tab 1 – Completion Statement: A formal statement that the CONTRACTOR
has completed the following requirements and is ready to move to the next phase
of commissioning:
(1) All requirements and punch list items associated with pre-commissioning.
(2) EID data (serial no., purchase price, startup date, project phase, and misc.
info) (include reference to EID submittal number).
b. Tab 2 – ORT: Signed and completed ORT procedures.
c. Tab 3 – Pre-FAT and FATFAT: Signed and completed Pre-FAT and FAT
procedures.
d. Tab 4 – Field Performance Tests: Field performance test results.
e. Tab 5 – Operator Training: The Manufacturer Services Tracking Report as
specified in Part 1, Article entitled “Record Keeping System and Tracking Tools”
of this section shall be provided showing that all operator training has been
provided.
f. Tab 6 – Configuration Files: Any revisions to PDF printouts of configuration
files highlighting all changes from the standard default configuration and revisions
to electronic configuration files in their native format as required in the
Commissioning – Phase 1 Gate Report. Include the Electronic Configuration File
Tracking Report as specified in Part 1, Article entitled “Record Keeping System
and Tracking Tools” of this section showing which setting information has been
revised.
g. Tab 7 – Redlined Drawings: Up to date redlined drawings:
(1) Redlined single line diagrams
(2) Redlined P&ID’s
(3) Redlined loop drawings signed by the ENGINEER
(4) Redlined schematics and elementary diagrams
(5) Redlined control panel drawings
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-24
(6) Redlined wiring drawings
F. Commissioning – Phase 4 Gate Report, RAT
1. At a minimum, the Commissioning – Phase 4 Gate Report shall include the
following:
a. Tab 1 – Completion Statement: A formal statement that the CONTRACTOR
has completed all requirements and punch list items associated with the current
commissioning phase and is ready for Substantial Completion.
b. Tab 2 – RAT: Signed and completed RAT procedures.
c. Tab 3 – COPO: All non-electrical manufacturer certificates of proper operation.
The Manufacturer Services Tracking Report as specified in Part 1, Article entitled
“Record Keeping System and Tracking Tools” of this section shall be provided
showing that all COPOs have been provided.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 GENERAL
A. Pre-commissioning is made up of all the activities that shall be completed before the
CONTRACTOR is permitted to begin Commissioning.
B. Commissioning is composed of the following four (4) phases:
1. Phase 1: This phase performs electrical commissioning and energization.
2. Phase 2: This phase performs Pre-ORT and readiness tests on equipment to make
sure that they are properly installed and configured and are ready to be commissioned.
3. Phase 3: This phase performs the ORT and FAT.
4. Phase 4: This phase performs the RAT and PAT.
C. Tables 1a and 1b illustrate many of the tasks to be completed in each phase.
D. Testing and Tie-in Coordination
1. Notify the ENGINEER in writing not less than fourteen (14) days in advance of the
planned start date of equipment testing and tie ins to coordinate with plant operations
and maintenance staff.
E. Field Testing Information
1. Preliminary copies of testing data in field report form shall be made available to the
ENGINEER within two (2) days after completion of each test. This information shall
remain available to the ENGINEER for the duration of the Project.
F. Materials and Equipment
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-25
1. Provide all testing and recording devices required for specified tests. Test
equipment shall be calibrated annually.
2. Provide all lubricating oil, hydraulic oil, grease, packing, and insulating and
lubricating fluids and filters required to clean, blow out, flush, and initially charge
equipment and systems.
G. The Commissioning Coordinator shall maintain one (1) set of the following
documentation in the field for the ENGINEER:
1. All Drawings, Specifications, addenda and Change Orders;
2. Updated Commissioning Plans for each commissioning package; and
3. Copy of drawings and hardware submittals for equipment being tested.
4. Redlined or updated loops, P&ID’s, instrument configuration parameters,
calibration sheets, single line diagrams, control panel drawings, schematics,
elementary diagrams, and interconnect diagrams.
H. Daily Schedule for Testing
1. The Commissioning Coordinator shall begin each day of witnessed testing by
meeting with the ENGINEER.
2. The meeting purpose is to review the test schedule, the test results from the
previous day, and where applicable, to coordinate the testing schedule with Plant
Operations.
3. Commissioning Coordinator may need to schedule some testing outside normal
working hours because of plant operational requirements.
4. The Commissioning Coordinator shall be prepared to rearrange portions of the
commissioning schedule under short notice due to unanticipated plant conditions,
equipment failure or unusually high sewage flows caused by wet weather.
I. Retesting
1. When testing or operation of the equipment demonstrates that the equipment does
not meet the specified requirements, CONTRACTOR shall repeat or perform all
additional tests as necessary and required by the ENGINEER.
J. Continuous Operation
1. After successful Reliability Acceptance Test of a specific equipment or portion of
a system, OC SAN may elect to operate the specific equipment or portion of a system
for continuous operation. Such operation will not interfere with the testing of other
equipment and systems that may still be underway and shall not preclude the need to
start up the portion operated in combination with the rest of the facility when all testing
is completed.
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-26
TABLE 1a
PRE-COMMISSIONING (Construction)
Equipment Submittal Process Complete
Commissioning Plan
CONTRACTOR’s Lock-out Tag-out and Safety Procedures
Factory Demonstration Test Procedures
Factory Performance Tests
Factory Demonstration Test - Part 1 (Unwitnessed) (Divisions 11, 15, 16 and 17)
Factory Demonstration Test - Part 2 (Witnessed) (Divisions 11, 15, 16 and 17)
All Factory Demonstration Test (FDT) Reports (Divisions 11, 15, 16 and 17)
RFIs and Responses up to Date and all Approved Changes Complete Associated with the Work
Electrical System Analyses and Measurements Information (Section 16431)
Seismic Calculations
Mechanical Alignment Reports
Metallurgical Test Reports
Pressure Test Reports
Electrical Equipment Tests (Section 16080 and Div. 16)
Motors Tested by CONTRACTOR (Section 16080)
Conductor Test Reports
Conductor Torque Logs
Equipment and Instrument Tags Are Properly Installed
EID Data (Manufacturer and Model Number) (received 90 days prior to Phase 1)
[Approval of Section 17410, Programming by Contractor, Step 4 – Bench Test]
All Operating Permits
Operator & Maintenance Training Plan
All Draft Individual Equipment Service Manuals (received 90 days prior to Phase 1)
Inspect and clean all electrical equipment, devices, instruments, enclosures, pull boxes, field control panels
and control panels and secure all panel and wire covers associated with the loop checks
Electrical Rooms are Clean and all Construction Work in the Electrical Room is Complete
(Wiring may be remaining for equipment not being energized)
Unwitnessed Loop Check
*Indexed Summary of the Completed Pre-Commissioning Requirements (tests, certificates and reports)
*All Instrument Calibration Reports (factory and field) (Section 17010 and Div. 17)
*All Electronic Devices Configuration Files in PDF (default value changes highlighted) and Native Formats
*All Manufacturer Certificates of Proper Installation (COPI)
*Wire Termination/Tag Check and Witnessed Loop Check
*All Redline As-Built Drawings for the Commissioning Package (as required in the Gate Report)
Pre-commissioning Gate Report
Obtain ENGINEER’s authorization to Proceed
* Required for the Gate Report
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-27
TABLE 1b
COMMISSIONING
PHASE 1 – ELECTRICAL EQUIPMENT ENERGIZATION
*HVAC for Electrical Equipment is Commissioned and Operational
(HVAC shall be commissioned and initially operated using temporary power its associated electrical
distribution equipment is commissioned and energized)
*Permission to Energize Electrical Equipment
*Electrical Operational Readiness Test (ORT)
*Electrical Functional Acceptance Test (FAT)
*Post-Energization Electrical Testing (Section 16080 and Div. 16)
*All Manufacturer Certificates of Proper Operation (COPO)
*All Electronic Devices Configuration Printout in PDF Format (highlight changes to default values)
*All Redline As-Built Drawings for the Commissioning Package (as required in the Gate Report)
Commissioning – Phase 1 Gate Report
Obtain ENGINEER’s authorization to Proceed
PHASE 2 – PRE-ORT
*Pre-ORT Activities and Tests
*Equipment Vibration Tests
*Motor Uncoupled Run Test (Section 16080)
*All Instrument Calibration Reports (factory and field) (Packaged Equipment)
*Manufacturer Pre-Checks for Packaged Equipment
Commissioning – Phase 2 Gate Report
Obtain ENGINEER’s authorization to Proceed
PHASE 3 – ORT AND FAT
*Operational Readiness Test - (ORT)
*Pre-Function Acceptance Testing (Pre-FAT)
*Functional Acceptance Test (FAT)
*Field Performance Tests
*Operator Training received 30 days prior to Phase 4
*Revised Device Settings and Configuration Files
*All Redline As-Built Drawings for the Commissioning Package (as required in the Gate Report)
EID Data (Serial No., Purchase Price, Startup Date, Project Phase, and Misc. Info)
Commissioning – Phase 3 Gate Report
Obtain ENGINEER’s authorization to Proceed
PHASE 4 – RAT
*Reliability Acceptance Test (RAT)
*All Manufacturer Certificates of Proper Operation (COPO)
Commissioning – Phase 4 Gate Report
Substantial Completion
Performance Acceptance Test (PAT)
Final Equipment Service Manuals
Final Punch List
Final As-Built Drawings
Final Completion
* Required for the Gate Report
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-28
3.2 MANUFACTURER'S FIELD SERVICES
A. It is the CONTRACTOR’s responsibility to provide the services of the appropriate
manufacturer’s personnel during equipment installation, facilities testing, pre-
commissioning, commissioning and training of OC SAN personnel. Where manufacturer’s
services are specified in this section and other Specifications sections, the CONTRACTOR
shall furnish authorized manufacturer personnel who are factory-trained, knowledgeable,
and experienced in the technical aspects of their products and systems supplied on the
project and qualified to provide these services.
B. Manufacturer Certifications
1. After installation and before equipment energization, each manufacturer’s
personnel shall prepare a written Certificate of Proper Installation (COPI), certifying
that the equipment specified in Divisions 8, 10, 11, 13, 14, 15, 16 and 17 is properly
installed and lubricated, has been properly maintained by the CONTRACTOR, is in
accurate alignment, and is free from any undue stress imposed by connecting piping
or anchor bolts in accordance with the manufacturer’s installation instructions.
2. During Phase 4 of Commissioning, each manufacturer's personnel shall prepare a
written Certificate of Proper Operation (COPO), certifying that the equipment specified
in Divisions 8, 10, 11, 13, 14, 15, 16 and 17 is properly lubricated; has been properly
maintained by the CONTRACTOR; is in accurate alignment; is free from any undue
stress imposed by connecting piping or anchor bolts; and has been operated under all
design conditions and meets the performance criteria in accordance with the
requirements in the Specifications section and the manufacturer’s operating
requirements. Electrical COPOs for switchgear, automatic transfer switches, battery
chargers, generators, panelboards, transformers, and uninterruptible power supplies
shall be submitted after the electrical FAT. Electrical COPOs for motor control centers,
motor starters, and variable frequency drives and all system, equipment, instruments,
and device COPOs shall be submitted after RAT.
C. Submit a letter from the manufacturer stating that the proposed manufacturers’
representatives who will perform these services is qualified, trained and experienced in
performing the required services.
D. Scheduling of Manufacturer’s Field Services
1. The scheduling of all visits to the site by the manufacturer’s field services
personnel shall be determined by the CONTRACTOR. The CONTRACTOR shall notify
the ENGINEER in advance of all visits, so the ENGINEER can be available to observe
the activities and coordinate with OC SAN Operation staff if required.
2. Manufacturers’ personnel shall resolve assembly problems associated with their
products and equipment.
3. During the testing, the manufacturer’s personnel shall assist, as applicable, with
performing equipment and device adjustments and calibrations.
3.3 PRE-COMMISSIONING ACTIVITIES
A. Pre-commissioning is made up of all the activities that shall be completed before the
CONTRACTOR is permitted to begin Commissioning. Table 1a illustrates many of the
tasks.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-29
B. The primary pre-commissioning activities consist of construction, factory testing,
documentation, component testing, calibration, stand-alone equipment testing, electrical
testing, conductor torquing, pipe pressure testing, unwitnessed loop checks, wire tag
checks and witnessed loop checks associated with a commissioning package. The intent
is to test isolated equipment and components.
C. In addition to the items identified in Table 1a, the following activities shall be completed
during pre-commissioning:
1. FDT 1 – Factory Demonstration Test Part 1 – Refer to section 17405 for more
information on control panel FDTs.
2. FDT 2 – Factory Demonstration Test Part 2 – Refer to section 17405 for more
information on control panel FDTs.
3. Instrument Calibration: CONTRACTOR shall calibrate non-factory-calibrated
instruments and verify calibration of factory calibrated instruments in the presence of
the ENGINEER. The CONTRACTOR shall use only qualified people trained and
familiar with the calibration testing equipment and instruments being calibrated. The
CONTRACTOR shall have available at the testing location the individual instrument
cut sheets with manufacturer tolerances, factory calibration certificates (where
available), and ISA data sheets for the ENGINEER. The CONTRACTOR shall use the
pre-filled-out instrumentation calibration forms developed in the Commissioning Plan
at the time of testing. Once complete, the ENGINEER will sign the calibration form.
This signature does not imply ENGINEER acceptance, rather it indicates that the
ENGINEER has witnessed the activity. Instrument calibration is still subject to the
ENGINEER’s acceptance during the review of Pre-Commissioning Gate Report. All
instruments shall have been calibrated within a year prior to starting RAT. Testing shall
be done as follows:
a. Analog Instruments:
(1) A five-point calibration check (unless otherwise specified in the individual
instrument Specifications sections) shall be performed and results shall be
recorded on individual calibration sheets with three (3) significant digits.
All testing shall be done with a calibrated test instrument. Each hardwired
analog signal shall be tested to verify proper performance within specified
tolerances. Specified accuracy tolerances for each analog signal is
defined as the root-mean-square-summation of individual component
accuracy requirements. Individual component accuracy requirements
shall be based on the more stringent value between the tolerance
specified in the Contract Documents and the published manufacturer
specifications.
(a) Factory wet calibrated magnetic flow instruments do not require field
calibration. Verification of proper operation shall be verified during
FAT.
b. For discrete instruments, a calibration check shall be performed with a
calibrated test instrument. The ‘set’ and ‘reset’ values shall be recorded as well as
the dead band repeated through three (3) cycles.
4. Inspect and clean all electrical equipment, devices, instruments, enclosures, pull
boxes, field control panels and control panels associated with the loop checks, so they
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-30
are free of dirt, debris, and foreign materials and verify all wireway covers and panel
doors are properly installed and secure.
5. Industrial Control System (ICS) Network:
a. CONTRACTOR shall not utilize the ICS network to perform loop checks.
Computer and non-Project equipment connections to the ICS network are only
allowed by OC SAN.
b. Complete the installation of all equipment, fiber optics, and cabling associated
with the ICS network, including fiber optic and cabling to the RIO panels. The
CONTRACTOR shall complete the testing of all fiber and copper cabling, submit
test reports, and obtain the ENGINEER’s acceptance. All Work within the ICS
network rooms shall be complete where the ICS network equipment is installed in
perforated enclosures. The HVAC system shall be complete and operational.
Temporary power or permanent power shall be provided for the ICS network and
control system equipment for configuration and testing.
c. Once all ICS network activities are complete, the CONTRACTOR shall notify
the ENGINEER and shall provide OC SAN a minimum of [three (3)] [six (6)]
[twelve (12)] weeks to perform the ICS network configuration and testing.
d. After the ICS network configuration and testing are complete, the ENGINEER
will notify the CONTRACTOR in writing.
e. CONTRACTOR shall not begin commissioning for a commissioning package
until the ICS network associated with the commissioning package is complete. The
CONTRACTOR shall coordinate the required level of completion and connection
of the ICS network with the ENGINEER. Only control system equipment that is
ready for commissioning will be connected to the ICS network.
f. CONTRACTOR may request to have OC SAN perform the ICS network
configuration and testing during Pre-ORT to utilize permanent power for the ICS
network and control system equipment, provided OC SAN is given the required
time to configure and test the ICS network and the control system equipment
required to perform the ORT and FAT procedures for electrical equipment
energization is provided with temporary power until permanent power is available.
6. Unwitnessed Loop Check:
a. CONTRACTOR shall use accepted loop drawings to perform unwitnessed
loop checks.
b. Unwitnessed loop checks shall not begin until the following Work is complete
for the associated commissioning package:
(1) All equipment, instrumentation, and accessories are properly labeled and
installed.
(2) All instruments are calibrated.
(3) All field and panel wiring associated with a commissioning package is
complete, including all wiring to the associated RIO panels.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-31
c. Perform an unwitnessed loop check, testing the continuity of all control and
signal circuits shown on the accepted loop drawings for the RIO panel, including
all associated motor starter, equipment, control panel, and field wiring. The loop
check shall confirm and document the complete loop wiring, including I/O to/from
PLC register (excluding the application software) is ready for operation. The
CONTRACTOR shall use the PLC programming software to check all inputs and
outputs to and from the temporary PLC at the RIO.
d. Highlight each successfully tested conductor using a “yellow” highlighter. Once
the loop check is complete for each loop drawing, the CONTRACTOR shall initial
the loop drawing indicating the unwitnessed loop check, wire terminations and tags
are correct and shall sign off the unwitnessed verification columns in the Wire
Tag/Loop Check Tracking Spreadsheet.
e. OC SAN will provide a maximum of two (2) temporary PLCs for the Project.
The CONTRACTOR shall provide OC SAN one (1) day to set up and configure a
temporary PLC at each location it is provided.
f. All redline changes to the loop drawings identified during the unwitnessed loop
check shall be documented. The field loop drawings shall be field reviewed and
accepted by the ENGINEERENGINEER’s prior to performing the associated wire
termination/tag check and witnessed loop check.
g. Signals shall be tested per signal type as described in Tables 2a though 2g. If
one of these tables does not apply to a circuit, the CONTRACTOR shall request
an acceptable testing method from the ENGINEER. Loop checks shall be
performed by RIO panel, and all terminations and labeling shall be complete to this
panel on both the field and panel side before commencing with the activity.
h. All loop signals shall be tested from the field sensing element, device contract
or signal generating device (PLC output module) to the final receiving device
(indicator, variable frequency drive, starter, etc.) or PLC input module through all
devices in the loop for accuracy and performance.
7. Wire Termination and Tag Check:
a. All equipment, instrumentation, and accessories are properly tagged.
b. ENGINEER will use the accepted redlined loop drawings provided after the
unwitnessed loop check to perform the wire termination and tag check.
c. This activity is a joint effort between the CONTRACTOR and the ENGINEER
and shall take place between the unwitnessed loop check and the witnessed loop
check. The CONTRACTOR shall work with the ENGINEER to verify that redlined
as-built loop drawing wire terminations and tags match those in the field, RIO, PLC
and electrical equipment. The CONTRACTOR shall assist the ENGINEER
throughout the duration of the wire tag check, which includes opening motor
starters, control panels, electrical equipment, panels, valves, equipment,
instruments, devices, terminal junction boxes, junction boxes, etc. as requested by
the ENGINEER to verify wire terminations and tags in accordance with the loop
drawings.
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-32
d. The ENGINEER will highlight each complete conductor termination and wire
tag during the wire termination and tag check using a “blue” highlighter. Once
verified as complete and accurate, the ENGINEER will initial the loop drawing
indicating the wire terminations and tags are correct and will sign off the wire tag
verification columns in the Wire Tag/Loop Check Tracking Spreadsheet.
e. Any deficiencies noted at this stage shall be recorded by the ENGINEER as
punch-list items. Each punch-list item shall be assigned a priority such as pre-
witnessed loop check, pre-ORT, pre-FAT, pre-RAT, and post-RAT. Punch-list
items identified as pre-witnessed loop check shall be completed by the
CONTRACTOR and verified by the ENGINEER prior to witnessed loop checks.
f. The CONTRACTOR shall not proceed to witnessed loop check until the wire
tag check activity is complete and acceptable to the ENGINEER and all pre-
witnessed loop check punch list items are complete.
8. Witnessed Loop Check:
a. Provide temporary 120VAC power, if required, to loop check all conductors.
b. Use the PLC programming software to check all inputs and outputs to and from
the PLC.
c. OC SAN will provide a maximum of two (2) temporary PLCs for the Project.
The CONTRACTOR shall provide OC SAN one (1) day to set up and configure a
temporary PLC.
d. Perform a witnessed loop check using the same procedures as the
unwitnessed loop check, but witnessed by the ENGINEER to demonstrate proper
operation. All redline changes to the loop drawings identified during the witnessed
loop check shall be documented and submitted for ENGINEER’s acceptance prior
to moving to ORT.
e. ENGINEER will highlight each successfully tested conductor using a “blue”
highlighter. Once the loop check is complete for each loop drawing, the
CONTRACTOR shall initial the loop drawing indicating the loop check is correct
and shall sign off the witnessed verification columns in the Wire Tag/Loop Check
Tracking Spreadsheet.
f. All wiring changes or modifications to equipment, RIO panels, electrical
equipment, instruments, devices, etc., after any witnessed loop checks have been
completed, shall be witnessed by the ENGINEER to verify none of the previously
tested wiring is disturbed.
g. PLC and RIO control panels associated with the commissioning package shall
be locked at the end of each day and when loop checks are not being performed.
Panels shall remain locked using CONTRACTOR and ENGINEER locks from loop
checks through RAT. Any field modifications to the control panels shall be agreed
upon by the CONTRACTOR and ENGINEER.
TABLE 2a LOOP CHECK TESTING - DISCRETE INPUT (NORMALLY OPEN)
Index Action Verification
1 Do one of the following: Verify the input is ON using a laptop
networked to the PLC.
DR
A
F
T
I I
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-33
Trigger a close field switch/contact
from the device
Place a temporary jumper between
the terminals
2
Do one of the following:
Trigger an open field switch/contact
from the device
Remove temporary jumper
Verify the input is OFF using a laptop
networked to the PLC.
TABLE 2b LOOP CHECK TESTING - DISCRETE INPUT (NORMALLY CLOSED)
Index Action Verification
1
Do one of the following:
Trigger an open field switch/contact
from the device
Disconnect one of the wires at the
field device to open the circuit
Verify the input is OFF using a laptop
networked to the PLC.
2
Do one of the following:
Trigger a closed field switch/contact
from the device
Reconnect the disconnected wire
Verify the input is ON using a laptop
networked to the PLC.
TABLE 2c LOOP CHECK TESTING - DISCRETE OUTPUT
Index Action Verification
1
Force the output ON using a laptop
networked to the PLC.
Do one of the following:
Verify the field device receives the output
responding to a closed circuit (i.e., relay
closes, solenoid closes, etc.)
Wire field leads to a multimeter and verify
continuity
2
Force the output OFF using a laptop
networked to the PLC.
Do one of the following:
Verify the field device loses the output
responding to an open circuit (i.e., relay
opens, solenoid opens, etc.)
Wire field leads to a multi meter and verify that
there is no continuity
TABLE 2d LOOP CHECK TESTING - DISCRETE INTERCONNECT (NORMALLY OPEN)
Index Action Verification
1
Do one of the following:
Trigger a closed field switch/contact
from the device
Do one of the following:
Verify device/panel/equipment/motor starter
receives the signal indicating a closed circuit
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-34
Place a temporary jumper between
the terminals
Wire field leads to a multimeter and verify
continuity
2
Do one of the following:
Trigger an open field switch/contact
from the device
Remove temporary jumper
Do one of the following:
Verify device/panel/equipment/motor starter
receives the signal indicating an open circuit
Wire field leads to a multimeter and verify that
there is no continuity
TABLE 2e LOOP CHECK TESTING - DISCRETE INTERCONNECT (NORMALLY CLOSED)
Index Action Verification
1
Do one of the following:
Trigger an open field switch/contact
from the device
Remove one of the wires to open
the circuit
Do one of the following:
Verify device/panel/equipment/motor starter
receives the signal indicating an open circuit
Wire field leads to a multimeter and verify that
there is no continuity
2
Do one of the following:
Trigger a closed field switch/contact
from the device
Reconnect the disconnected wire
Do one of the following:
Verify device/panel/equipment/motor starter
receives the signal indicating a closed circuit
Wire field leads to a multimeter and verify
continuity
TABLE 2f LOOP CHECK TESTING - ANALOG INPUT
Index Action Verification
1
Do one of the following after confirming
correct source for field device (loop or
external power):
Use the field device to simulate a 50%
signal (12.000 mA). Record the value
of the signal in mA to three decimal
places on the witness loop check form.
Connect wires to a transmitter
simulator to simulate 50% signal
(12.000 mA). Record the value of the
signal in mA to three decimal places on
the witness loop check form.
Verify 2048 counts at the appropriate input
using a laptop networked to the PLC.
Confirm that the value for the individual
channel is not greater than 2051 counts and
not less than 2045 counts. Note any values
that fall outside of this range.
Confirm that the signal is steady (no noise). DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-35
TABLE 2g LOOP CHECK TESTING - ANALOG OUTPUT
Index Action Verification
1
Force the output to 50% or 2048
counts using a laptop networked to the
PLC.
Do one of the following:
Verify field device response is at 50% of
scale.
Wire field leads to a multi meter. Confirm
that the value is not greater than 12.032 mA
or less than 11.968 mA. Note any values
that fall outside of this range.
Confirm that the signal is steady (no noise).
2
Remove simulation. Do one of the following:
Verify field device response is 0% of scale.
Wire field leads to a multi meter and verify
that the value is not less than -.032 mA and
not greater than .032 mA. Note any values
that fall outside of this range.
Confirm that the signal is steady (no noise).
D. Electrical Equipment Preparation for Energization:
1. Check for proper equipment installation and grounding.
2. Check all electrical connections are properly tagged and torqued.
3. Verify electrical equipment has been properly tested.
E. A post-witnessed loop check inspection shall be performed by the ENGINEER.
F. CONTRACTOR shall not proceed to Phase 1 electrical equipment energization until
the witnessed loop check activities are complete and acceptable to the ENGINEER and all
pre-electrical equipment energization punch list items are complete.
G. Once all pre-commissioning activities are complete for a commissioning package and
the required submittals, including all items identified under pre-commissioning in Table 1a
and the Pre-Commissioning Gate Report, are acceptable to the ENGINEER, the
CONTRACTOR shall request to begin commissioning Phase 1 for the associated
commissioning package and shall request permission to energize the electrical equipment
associated with the commissioning package. If the ENGINEER agrees that the
CONTRACTOR has successfully completed all pre-commissioning requirements, the
ENGINEER will notify the CONTRACTOR in writing that the CONTRACTOR may begin
Phase 1 commissioning for the commissioning package and will provide permission to
energize.
3.4 COMMISSIONING – PHASE 1, ELECTRICAL EQUIPMENT ENERGIZATION
A. All Pre-Electrical Equipment Energization activities for a commissioning package shall
be completed before the CONTRACTOR is permitted to begin commissioning Phase 1 for
that commissioning package.
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-36
B. Obtain the ENGINEER’s written authorization to energize each piece of electrical
equipment for the first time.
C. Electrical ORT/FAT Activities
1. Electrical ORTs shall be performed for all electrical equipment in accordance with
Part 3, Article entitled “Commissioning – Phase 3, ORT Activities” below, after
completion of pre-commissioning activities, NETA testing and after receipt of vendor
certificate of proper installation.
2. Electrical FATs shall be performed for all electrical switchgear systems,
generators, uninterruptible power supplies (UPS), battery charging systems, and
automatic transfer switches in accordance with Article entitled “Commissioning –
Phase 3, FAT Activities” below. This test shall check, demonstrate, and document that
all local manual, remote and automatic interlocks, switching scenarios, I/O and controls
are functional and meet the specified requirements. Any temporary power for testing
of breakers, switchgear and battery charger system (125 V dc), if required, shall be
provided by the CONTRACTOR. This test will be witnessed by the ENGINEER.
Qualified CONTRACTOR and vendor personnel capable of operating and
troubleshooting electrical equipment shall be available during this test. Test shall be
directed by the CONTRACTOR’s Commissioning Coordinator.
3. ORTs and FATs for motor control centers and variable frequency drives shall be
performed during commissioning Phases 3. The Pre-Commissioning activities and
Phase 1 Electrical Equipment Energization shall ensure that the electrical equipment
is safe, functional, and ready for energization and use during commissioning Phases
2, 3 and 4.
D. Electrical Equipment Energization
1. The electrical equipment energization process shall be performed in accordance
with manufacturer procedures.
2. Check power supply for correct voltage and rotation.
3. Check for correct connections, operation, and performance of electrical power
distribution equipment such as switchgear, motor control centers, uninterruptible power
system, and dc system specified in Specifications Section 16080, Electrical Testing,
and elsewhere in Division 16.
4. 12kV and 480V switchgear shall be energized after their associated ORTs and
FATs are complete.
5. Post-energization testing shall be performed as described in the other
Specifications sections. CONTRACTOR shall use the list developed as specified in
Part 1, Article entitled “” Record Keeping System and Tracking Tools” of this section.
6. Electrical RAT shall be performed during the facility RAT.
E. Vendor training of electrical equipment for OC SAN personnel shall be completed prior
to the completion of the associated commissioning package FAT.
F. A post-Phase 1 commissioning inspection shall be performed by the ENGINEER.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-37
G. CONTRACTOR shall not proceed to Phase 2 commissioning until the electrical
equipment energization activities are complete and acceptable to the ENGINEER and all
pre-Phase 2 commissioning punch list items are complete.
H. Once all Phase 1 commissioning activities are complete for a commissioning package
and the required submittals, including all items identified under commissioning in Table 1b
and the Commissioning Phase 1 Gate Report, are acceptable to the ENGINEER, the
CONTRACTOR may request to begin Phase 2 commissioning for the associated
commissioning package. If the ENGINEER agrees that the CONTRACTOR has
successfully completed all commissioning Phase 1 requirements, the ENGINEER will notify
the CONTRACTOR in writing that the CONTRACTOR may begin Phase 2 commissioning
for the commissioning package.
3.5 COMMISSIONING – PHASE 2, PRE-ORT ACTIVITIES
A. All pre-ORT activities for a commissioning package shall be completed before the
CONTRACTOR is permitted to begin commissioning Phase 3 for that commissioning
package.
B. Cleaning and Checking: Prior to testing of all equipment:
1. Inspect and clean all process and mechanical equipment, devices, and connected
piping associated with the commissioning package, so they are free of dirt, debris, and
foreign material.
2. Clean the area associated with the commissioning package.
C. Equipment Preparation for Testing and Operation
1. Lubricate equipment in accordance with manufacturer’s instructions.
2. Open and close valves by hand and operate other devices to check for binding,
interference, or improper functioning.
3. Check power supply to electric-powered equipment for correct voltage and phase
rotation.
4. Check for proper equipment alignment.
5. Verify piping systems and associated appurtenances are complete and piping
systems are pressure tested.
6. Verify pipe supports are complete.
7. Verify proper anchorage and grounding of equipment.
D. Pre-ORT Activities:
1. Perform tests recommended by the manufacturer’s field service representatives
and/or as required by manufacturer's catalogs or specifications.
2. Test gates and valves under dry conditions using manual controls. Operate
between end of travel limits and verify stop position. Repeat operation and adjust as
necessary. Verify proper programming and operation of actuator signals to the PLC
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-38
(e.g., alarm contact configuration, operation on power fail, etc.). Place gates and valves
in their normal position.
3. Bump all motor-driven devices and equipment in the manual/local mode,
independent of the PLC system, to verify proper operation and motor rotation.
4. Operate pump and motor systems (e.g., motor cooling, seal water, lubrication, etc.)
to verify proper operation.
5. Operate manual gates and valves to verify they properly open and close with no
binding.
6. Operate all mechanical systems to verify proper operation:
a. Plumbing and drainage systems
b. Ventilation systems
c. Plant water, industrial water, City water and plant air systems.
7. Check and operate pipeline accessories such as air valves and blow-off valves.
8. Verify electrical operation of auxiliaries including:
a. Solenoids
b. Manual valve limit switches
9. Vendor equipment pre-check testing and instrumentation calibration.
E. A post-Phase 2 commissioning inspection shall be performed by the ENGINEER.
F. CONTRACTOR shall not proceed to Phase 3 commissioning until the Phase 2
commissioning activities are complete and acceptable to the ENGINEER and all Pre-Phase
3 commissioning punch list items are complete.
G. Once all Phase 2 commissioning activities are complete for a commissioning package
and the required submittals, including all items identified under commissioning in Table 1b
and the Commissioning Phase 2 Gate Report, are acceptable to the ENGINEER, the
CONTRACTOR may request to begin Phase 3 commissioning for the associated
commissioning package. If the ENGINEER agrees that the CONTRACTOR has
successfully completed all commissioning Phase 2 requirements, the ENGINEER will notify
the CONTRACTOR in writing that the CONTRACTOR may begin Phase 3 commissioning
for the commissioning package.
3.6 COMMISSIONING – PHASE 3, ORT ACTIVITIES
A. The ORT shall test and document that all equipment and associated systems properly
operate in LOCAL, HAND and REMOTE MANUAL modes of operation using the developed
test procedures.
B. ORT tests shall be directed by the Commissioning Team Leader to determine that all
equipment, systems and subsystems are properly manufactured, installed, adjusted, and
functioning as specified.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-39
C. The ORT is a combined effort between ENGINEER and the CONTRACTOR. This is a
complete check of instrumentation, wiring, hardware, and software without water or any
other process fluid.
D. Notify the ENGINEER fourteen (14) days in advance of the need to have OC SAN
operate existing equipment that is part of an active treatment process (e.g., testing the
replacement of an existing motor starter, an existing pump, or operation of existing valves
or equipment).
E. Troubleshoot all field, panel wiring, device, instrument and equipment problems.
F. All equipment shown connected to the control system and integrated as part of the
system in accordance with the Contract Documents, whether or not supplied and/or
installed by the CONTRACTOR, shall be tested as part of the ORT procedures. The
CONTRACTOR shall notify the ENGINEER in writing if equipment tested, but not supplied
by the CONTRACTOR, is faulty.
G. CONTRACTOR shall not perform a partial ORT on a commissioning package. All
equipment within a commissioning package shall undergo ORT together without any
significant delay in subsequent testing unless approved by the ENGINEER.
H. CONTRACTOR shall not perform an ORT on a RIO panel until all panel and field wiring
is complete and all devices and equipment associated with that RIO panel have gone
through pre-commissioning, including instrument calibration and witnessed loop checks.
I. Software:
1. This is a combined test involving the hardware and the software. The combined
software/hardware system is tested from this point forward. OC SAN will load their
developed human machine interface (HMI) graphics and PLC programs prior to the
test. CONTRACTOR shall provide OC SAN one (1) day to download the HMI and PLC
programs. The CONTRACTOR shall provide the ENGINEER time to test and
troubleshoot their program during ORT. Testing shall utilize the installed project PLC.
2. Load any of their PLC programs at this time and shall be responsible for all
troubleshooting, modifications and corrections associated with their software program.
The ENGINEER will assist with the testing of the CONTRACTOR’s program and shall
be notified of all changes being made to the programs. All changes shall be well
documented and submitted to the ENGINEER.
J. ORT Execution:
1. The Commissioning Team Leader shall conduct a pre-test, walk-through/field
meeting and pre-startup checklist with the ENGINEER prior to performing an ORT for
each commissioning package to verify all valving, gates, disconnect switches and
selector switches are in the proper position for testing.
2. Energize all equipment that is part of the test.
3. The Commissioning Team shall follow the accepted ORT procedures.
4. If a test step is successful, the step shall be signed by the CONTRACTOR and the
ENGINEER.
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-40
5. If a test step fails, the Commissioning Team (ENGINEER and/or CONTRACTOR)
shall be allowed ten (10) minutes to troubleshoot the item. If the troubleshooting period
exceeds ten (10) minutes, the Commissioning Team shall clearly document the failure
on the ORT procedure and move on to the next available independent test step.
6. Once all tests in a procedure are complete, the CONTRACTOR shall investigate
the failures, make repairs, and notify the ENGINEER how the repairs were performed.
Tests shall be repeated on all failed tests and previously completed tests that were
impacted by the troubleshooting or repair activity, as decided by ENGINEER.
7. Testing shall continue until all tests are signed by the CONTRACTOR and
ENGINEER as successful.
8. Test discrete and analog instrumentation from the field device to I/O or other
destination by simulation. Analog instrument signals must be tested at 0%, 25%, 50%,
75% and 100%. CONTRACTOR shall simulate each instrument using the methods
described in TABLE 3. If instrument type is not listed here, the CONTRACTOR shall
use a method approved by the ENGINEER. The CONTRACTOR shall not use a
multimeter or the transmitter to simulate a signal unless given permission by the
ENGINEER or it is permitted in TABLE 3.
TABLE 3 - Instrument Simulation for Loop Check / ORT
Instrument Type Simulation Action
Level Simulate from Transmitter
Flow Simulate from Transmitter
Pressure Hand Pump
Temperature Water/oil Bath
Gas (i.e., LEL, CO, H2S, etc.) Calibration Gas – Single Point
Ph Calibration Solution
Chlorine Calibration Solution
Weight Test Load
ORP Calibration Solution
Sludge Density Known Sample
Vibration Simulation Equipment (Shaker or Wobbulator)
Motor Winding/Bearing Temperature Verify ambient, Compare to Adjacent
Electrical Parameters (Voltage, Current, etc.) Test Power Source
Motor High Temperature Switch Disconnect the field wire at the motor
Limit switch Operate valve (manual valve)
Operate limit switch (check valve)
9. Test of all hardwired controlled functions including interconnects, hand stations,
and pilot devices.
10. Test motorized, solenoid or pneumatic operated equipment local and remote
manual modes to verify that the operator can start and stop the equipment locally and
view its status using local pilot lights and the PLC/HMI.
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-41
11. Test each interlock for each piece of equipment in the commissioning package(s)
while the equipment is running in HAND and REMOTE MANUAL to verify that it shuts
off and indication is received. For interlock checkout the following applies:
a. If the equipment requires water to run the CONTRACTOR shall test it
uncoupled if it is motor driven.
b. If the equipment requires water to run but cannot be uncoupled or
mechanically manipulated to operate without water, interlock testing can be
performed with the power disconnected or in FAT with approval by the ENGINEER.
12. In addition to the tests described herein, OC SAN reserves the right to request
additional testing and retesting of equipment.
13. ORT inspection by the ENGINEER has been performed and all punch list items
that are prioritized as pre-FAT are complete.
K. A post-ORT commissioning inspection shall be performed by the ENGINEER.
L. The CONTRACTOR shall not proceed to Phase 3 FAT commissioning until the
Phase 3 ORT commissioning activities are complete and acceptable to the ENGINEER
and all Pre-FAT commissioning punch list items are complete.
3.7 COMMISSIONING – PHASE 3, PRE-FAT AND FAT ACTIVITIES
A. The pre-FAT shall test that equipment and instruments properly operate with water.
B. The FAT shall test and document that all equipment and systems are properly operated
and controlled in the REMOTE AUTOMATIC mode of operation by the PLC and human
machine interface (HMI) software and the AUTOMATIC mode of operation by local control
panels as intended using the developed test procedures. This test is accomplished with
the system on-line under normal operating conditions. Equipment will operate under load
with water when possible or the designed process (non-water process) (e.g., air, gas, etc.).
C. Pre-FAT and FAT shall be directed by the Commissioning Team Leader and performed
as specified herein.
D. The pre-FAT and FAT is a combined effort between the ENGINEER and the
CONTRACTOR.
E. The CONTRACTOR shall furnish and install all required testing piping and
appurtenances to verify pump and system performance and operation over the full
operating range. All testing piping and appurtenances shall be removed at the completion
of FAT testing.
F. The CONTRACTOR shall notify the ENGINEER fourteen (14) days in advance of the
need to have OC SAN operate existing equipment that is part of an active treatment
process (e.g., testing the replacement of an existing motor starter, an existing pump, or
operation of existing valves or equipment).
G. The CONTRACTOR shall troubleshoot all field, panel wiring, device, instrument and
equipment problems.
H. Software:
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-42
1. Provide the ENGINEER time to test and troubleshoot their program during pre-
FAT and FAT and shall provide the ENGINEER time to tune each process control loop
and each process control system the optimize the operation.
2. Use the permanent PLC to perform the pre-FAT and FAT procedures.
3. CONTRACTOR shall be responsible for all troubleshooting, modifications and
corrections associated with their software program. The ENGINEER will support the
testing of the CONTRACTOR’s program and shall be notified of all changes being
made to the programs. All changes shall be well documented and submitted to the
ENGINEER.
I. Pre-FAT and FAT Execution:
1. Conduct a pre-test, walk-through/field meeting and pre-startup checklist with the
ENGINEER prior to performing a pre-FAT and FAT for each commissioning package
to verify all valving, gates, disconnect switches and selector switches are in the proper
position for testing all valving, gates, disconnect switches and selector switches are in
the proper position for testing to prevent a wastewater spill.
2. Disinfect any non-potable water that will remain in a tank for a period longer than
twenty-four (24) hours to prevent it from going septic.
3. The Commissioning Team shall follow the accepted pre-FAT and FAT procedures.
4. If a test step is successful, the step shall be signed by the CONTRACTOR and the
ENGINEER.
5. If a test step fails, the Commissioning Team (ENGINEER and/or CONTRACTOR)
shall be allowed ten (10) minutes to troubleshoot the item. If the troubleshooting period
exceeds ten (10) minutes, the Commissioning Team shall clearly document the failure
on the Pre-FAT and FAT procedure and move on to the next available test step.
6. Once all tests in a procedure are complete, the CONTRACTOR shall investigate
the failures, make repairs, and notify the ENGINEER how the repairs were performed.
Tests shall be repeated on all failed tests and previously completed tests that were
impacted by the troubleshooting or repair activity, as decided by ENGINEER.
7. Testing shall continue until all tests are signed by the CONTRACTOR and
ENGINEER as successful.
J. In addition to the tests described herein, OC SAN reserves the right to request
additional testing and retesting of equipment.
K. A post-FAT commissioning inspection shall be performed by the ENGINEER.
L. CONTRACTOR shall not proceed to Phase 4 commissioning until the Phase 3
commissioning activities are complete and acceptable to the ENGINEER and all Pre-RAT
commissioning punch list items are complete.
M. Once all Phase 3 commissioning activities are complete for a commissioning package
and the required submittals, including all items identified under commissioning in Table 1b
and the Commissioning Phase 3 Gate Report, are acceptable to the ENGINEER, the
CONTRACTOR may request to begin Phase 4 commissioning for the associated
DR
A
F
T
PSA2021-001 COMMISSIONING
PROGRAMMING PROFESSIONAL SERVICES
01810-43
commissioning package. If the ENGINEER agrees that the CONTRACTOR has
successfully completed all commissioning Phase 3 requirements, the ENGINEER will notify
the CONTRACTOR in writing that the CONTRACTOR may begin Phase 4 commissioning
for the commissioning package.
3.8 COMMISSIONING - PHASE 4, RAT ACTIVITIES
A. The Reliability Acceptance Test (RAT) is designed to functionally test the facility as an
integrated system under normal operating conditions using wastewater, foul air, or other
process fluid or gas.
B. Reliability Acceptance Test: This test shall be directed by OC SAN personnel.
Equipment shall be operated only by OC SAN personnel with support from the
CONTRACTOR when requested. The purpose of this test is to demonstrate that all
systems operate continuously in the intended manner for an extended period without
failing. During the RAT, the system under test will be operated within design parameters
reflecting the day-to-day operation of the facilities for an uninterrupted period. The RAT will
be considered complete, in the opinion of ENGINEER, when the entire Project or specified
portion thereof has operated properly for [seven (7)] continuous days] without significant
interruption. Any failure of a process equipment unit (mechanical, electrical, instruments,
etc.) shall extend the RAT for ten (10) hours to confirm it is not a significant interruption.
1. “Significant interruption” during the Reliability Acceptance Test may include any of
the following events:
a. Failure of a system (process, control, etc.) that is not permanently corrected
within six (6) hours after such failure occurs.
b. Failure of a process equipment unit (mechanical, electrical, instruments, etc.)
that is not permanently corrected within eight (8) hours after such failure occurs.
2. “Permanently corrected” means without a repeat failure during the remaining
duration of Phase 4 and shall consist of the following:
a. Work repaired and replaced to conform with specified requirements
b. Parts and components replaced as recommended by original manufacturer
without impacting the warranty, and conforming with reviewed submittals
c. Piping and valves properly installed and connected
d. Wiring properly terminated
e. Accessories, including spare parts and lubricants, furnished as specified
f. The facility is back online and operating within normal operating parameters.
3. Occurrence of a significant interruption shall require RAT to be stopped and
restarted at time equals zero (begin at Day 1 again) after permanent corrections are
made.
C. Upon completion of the RAT, the CONTRACTOR shall conduct a field meeting with
the ENGINEER and operations staff, if the system is to be shut down or taken out of
DR
A
F
T
COMMISSIONING PSA2021-001
PROGRAMMING PROFESSIONAL SERVICES
01810-44
services, to verify that all valves, bleed-off valves, etc. are in the proper position to prevent
a wastewater spill when the system is placed back into service.
D. A post-RAT commissioning inspection shall be performed by the ENGINEER.
E. After successful completion of the RAT and acceptance of all Manufacturers’
Certificates of Proper Operation and the Commissioning Phase 4 Gate Report by the
ENGINEER, the CONTRACTOR may request that the facility is Substantially Complete
(refer to the General Conditions).
F. Final Completion is achieved by the CONTRACTOR and certified by the ENGINEER
when all final documents and activities as described in Table 1b are complete and accepted
by the ENGINEER (refer to the General Conditions).
G. Continuous Operation
1. After successful Reliability Acceptance Test of a specific equipment or system, OC
SAN may elect to operate a portion of the equipment or system for continuous
operation. Such operation will not interfere with testing of other equipment and
systems that may still be underway and shall not preclude the need to start up the
portion operated in combination with the rest of the facility when all testing is
completed.
* * * * * *
DR
A
F
T
RULES OF ENGAGEMENT PSA2021-001
1
ATTACHMENT A1
RULES OF ENGAGEMENT
This document describes options for OC San to utilize a Programming Professional Services
(PPS) agreement to maintain the Engineering Project program while complying with
Independent Contractor expectations.
There are two mechanisms by which professional services can be supplied through the PPS
agreement:
Task Authorizations
Task Directives
Task Directives assignments require that anyone working under the mechanism also have an
approved Personnel Authorization.
These Terms of Engagement are intended to document how services are to be requested,
authorized, and managed.
Task Authorizations
Task Authorizations have a formal scope of work, and a fixed upper limit. Distinguishing
aspects of Task Authorizations include the following:
Requests for Task Authorization Proposals (RFTAPs) require a scope of work prepared
by OC San staff.
RFTAPs and Task Authorizations must be approved by the Director of Engineering
(DOE).
The scope of work should have the same level of detail as used for a Design Task Order
or Planning Study Task Order, including schedule requirements, task, deliverables, and
assumptions.
Task Authorization must specify a firm negotiated upper limit which may not be
exceeded. If changes require a revision to that upper limit, it must be processed as a
formal Task Authorization Amendment prior to the work being authorized and performed.
The PPS Consultant shall report costs incurred for the Task Authorization in their
monthly invoices, with the total costs incurred to date, and the unused budget remaining.
The PPS Consultant may use any of their staff, whether they have an approved
Personnel Authorization or not.
The time that PPS Consultant staff charge to Task Authorizations does not count against
their approved number of hours for Personnel Authorizations.
Task Directive
Task Directives also have an explicit scope of work, but the level of detail may be lower. Task
Directives need a negotiated budgetary estimate, but it is not a firm upper limit.
The scope of work for Task Directives may be less detailed than what is required for a
Task Authorization.
A schedule to complete the work should generally be specified but is not always
required.
Costs are tracked separately on invoices.
DR
A
F
T
RULES OF ENGAGEMENT PSA2021-001
2
Personnel Authorizations are required for any staff working on a Task Directive.
Personnel Authorizations
Personnel authorizations (PA’s) provide the DOE’s approval for a particular individual to work on
Task Directives. They also designate the following:
The Project Role
Their location as either Home Office or Site. This impacts the overhead rate to be used
for billing.
The number of hours per week, or just a set number of hours as needed.
The total bill rate, including actual salary, overhead, and profit.
Any reimbursable expenses. This is typically used when travel is required or when a
staff member needs a vehicle assigned to them due to the nature of their assignments.
The following apply to Personnel Authorization:
They require approval by the DOE.
They are specific to one person.
They need not be project specific.
For on-site PA’s, the PA authorizes key cards.
Staff Supervision
The PPS Consultant is responsible for supervision of its entire staff, including the following:
Administrative Supervision (PPS Consultant staff only)
o Performance Reviews o Timecard Approvals
o Work Hours
Supervision of Assigned Scope Deliverables
o Work Prioritization o Technical input, guidance, and direction
Quality Control for
o Task Authorizations o Task Directives, when Quality Control is specified in the scope of work
OC San will not be responsible for supervision of PPS Consultant staff. OC San will however
provide direction as an Owner. Examples include the following:
Project decisions and priorities
Design standards
OC San’s preferences
Financial considerations
Risk considerations
Review for compliance with OC San Policies and Procedures
Coordination with other OC San projects and activities
DR
A
F
T
3/29/2022
1
Programming Professional Services
Contract No. PSA2021‐001
Presented by:
Mike Dorman
Engineering
Manager
Operations
Committee
April 6, 2022
14.8
15.8 15.9
14.1
12.1 11.8
11.0
12.4 13.0
10.6
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
22‐23 23‐24 24‐25 25‐26 26‐27 27‐28 28‐29 29‐30 30‐31 31‐32
Estimated Full Time Equivalents
2
Programming Workload
Process
Controls
Integration
(PCI) Group
Staff Level
PSA2021‐001 Contract
Project J‐120 ‐Process
Control System Upgrades
Fiscal Year
1
2
3/29/2022
2
•Task Assignments
•Programming and bench testing
•Commissioning
•Control system support
Consultants may not pursue other OC San work
during the term of the agreement
Programming Services
3
•Consultants propose teams for task requests
•Staff chooses firm with most appropriate staff
•Intent is to distribute work evenly
•Each contract limit is based on 60% of forecasted
work
Rules of engagement ensures consultant staff work
as independent contractors
Resource Requests
4
3
4
3/29/2022
3
5
Proposal
Score
Score after
Interview
Enterprise Automation 84 89
Maverick Technologies 70 73
South Coast Controls 51 ‐
Techne Network Inc. 21 ‐
Selection Process
Key Attributes –Enterprise Automation and Maverick Technologies
•Strong experience and knowledge
•Project execution process
•Local resources
6
Recommend to the Board of Directors to:
Approve Professional Services Agreements to provide
Professional Programming Services, Contract No.
PSA2021‐001, for a three‐year period commencing
May 1, 2022, through April 30, 2025, with two one‐year
renewal options, for an amount not to exceed
$4,900,000 per individual agreement with the
following two firms:
•Enterprise Automation
•Maverick Technologies
Recommendation
5
6
l
3/29/2022
4
Questions
?
7
7
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2022-2188 Agenda Date:4/6/2022 Agenda Item No:8.
FROM:James D. Herberg, General Manager
Originator: Riaz Moinuddin, Director of Operations & Maintenance
SUBJECT:
OPERATIONS & MAINTENANCE: WASTEWATER 101 PART 1: COLLECTIONS
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Information Item.
BACKGROUND
Each month, staff provides an informational presentation on topics of interest to the Board of
Directors. This month’s topic: Orange County Sanitation District Operations & Maintenance
Wastewater 101, Collection System.
RELEVANT STANDARDS
·24/7/365 treatment plant reliability
·Operate and maintain facilities to minimize impacts on surrounding communities, including
odor, noise, and lighting
·Listen to and seriously consider community input on environmental concerns
·Build brand, trust, and support with policy makers and community leaders
ATTACHMENT
The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda
package:
·Presentation
Orange County Sanitation District Printed on 3/29/2022Page 1 of 1
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
3/30/2022
1
Wastewater Collection System
Don Stokes,
Maintenance
Manager
Operations
Committee
April 6, 2022
388 miles of sewers
480 square miles
189 million gallons per day
2.6 million population
20 cities, 4 special districts
15 pump stations
2treatment plants
Our Service Area
Page 2
1
2
388 miles of sewers
479 square miles
183 million gallons per day
2.6 million population
2 e treatment plants
15 ■ pump stations
20 cities
4 special districts
(7,, unincorporated parts of
U County of Orange
3/30/2022
2
Wastewater Collection System
City
Local SewerManhole
Private
Lateral
OC San
Regional Trunkline
Ocean
OutfallOC San
Treatment
Plants
City
Manhole
To Orange County
Water District
Page 3
• Various pipe
materials
• Trunks,
interconnections,
reliefs
• Inverted siphons
• Diversions
Gravity Systems
Page 4
3
4
3/30/2022
3
Page 5
• Smallest = 8”
• Largest = 120”
• Majority range
24” to 60”
Pipe Sizes
Page 6
Inverted Siphon
5
6
Upstream pipe at higher water level than downstream pipe
Lake Wasltington Sltip Canal
3/30/2022
4
• Flush work
• Grit removal
• Spill prevention
• Tire cleaning
• Grit removal
• Spill prevention
• Line proofing
Line Cleaning Types
Page 7
Line Flushing
Page 8
7
8
-I IU~I I VVVI I'\.
• Grit removal
• Spill prevention
• Tire cleaning
• Grit removal
• Spill prevention
• Line proofing
3/30/2022
5
Page 9
Mechanical Cleaning ‐Tire
Page 10
Mechanical Cleaning ‐Tire
9
10
Pull Rig + T,-llerR1g
+
3/30/2022
6
Page 11
Technology Adoption
• Old vs. New
• Small vs. Large
Pressure Systems
Page 12
11
12
SmartCover" Unit Location e BUS0290--0110 • l Application: SmanClean® -----WllUl.evtllboveBOnom .-.~~:17011
Wll',dow 611 24h 43h 1w Al 2022-03-092003-2022-03-\81126 '::== 15i'I
12i'I .. .. ,.
□mOl-10-22 0J.-11·22 0)·12-22 0l-13-22 0l-\•·22 0l-1~22 0l-16'22 0)•17•22 0J.-18-22
O "-Pld<Vottaoe
Q SignllSWnvtll Olt•R•flll'I l202M2·221517-202:2.(ll-2215171
Q ~IQualily
Q T-ralllr&
ZoomType @Oeli.-t
O Auto
Q Maooal
• •
•
Anaheim
··9
Orange
"
"' .... --
,,.,.,.
Page 11
3/30/2022
7
Pump Station Maintenance
Page 13
• OC San relevant
standard – 2.1 sewer
spills per 100 miles.
• Collections’ goal – 0
spills
Our Goal ‐Prevent Sewer Spills
Page 14
13
14
3/30/2022
8
• OC San relevant
standard – 2.1 sewer
spills per 100 miles.
• Collections’ goal – 0
spills
Pee, Poop, & Paper
Page 15
• Bypass pumping
• Emergency
response
• Critical maintenance
• Assessments
• Bypass pumping
design
• Unique to each
station
• Agile and quick
assembly
Pump Station Resiliency
Page 16
15
16
3/30/2022
9
• State enforcement
• Damage prevention
• Other entity request
• Centralized system
through state:
Dig-Alert system
• Field locating and
marking
Underground Line Locating
Page 17
Regional Odor Control
Page 18
17
18
Liquid Treatment Chemical Tanks
■ Ferrous Chloride (5)
■ Calcium Nitrate (4)
■ Magnesium Hydroxide (4)
■ In Con.struct,on / In Progr&u (3)
Trunk Lines
Continuous Liquid-Treatment
Baker-Main
Euclid
Knott
Miller-Holder
Newport
• 36 Caustic Batching Manholes NiWl'O!ll llACH
Bay Bridge Pump Station
Crystal Cove Pump Station
N
A
Rev 1111121
3/30/2022
10
• Magnesium Hydroxide• Raises pH to keep 𝐻𝑆ି in solution
• Ferrous Chloride (Ferric Salts)
• Oxidize sulfide to sulfur
• Precipitates sulfide as ferric sulfide
• Calcium Nitrate (Bioxide)• Naturally occurring bacteria biochemically oxidize dissolved sulfide in the presence of nitrate
• Sodium Hydroxide
• Sloughs off slime layer
Odor Control Chemicals
Page 19
• Proactive outreach
• Investigate
• GIS tracking of “Hot Spots”
• Received AAEES award and patent for approach
Regional Odor Control Efforts
Page 20
19
20
SO ~-+ organic matt~r anaerobic
bacteria
H,S
S"+H,O +CO,
3/30/2022
11
• Asset inspection
• Structural degradation
and cleaning
• Project scoping
• Spill prevention
CCTV
Page 21
• Coordinate efforts
• Assist when a
crisis arises
• Assist with special
needs
Team ‐work & Coordination
Page 22
21
22
74.6
...
Roots Medium Joint
Position: 7 To 1
Severity: None
Percent: 10
Joint
Maint Weight: 3
3/30/2022
12
Questions
?
Page 23
23
OPERATIONS COMMITTEE
Agenda Report
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
File #:2022-2180 Agenda Date:4/6/2022 Agenda Item No:9.
FROM:James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
TPAD DIGESTER FACILITY AT PLANT NO. 2, PROJECT NO. P2-128
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Information Item.
BACKGROUND
Sludge is a byproduct of wastewater treatment that requires further processing to reduce pathogens
and volatile organic content so the remaining biosolids material can be beneficially reused in
compliance with state and federal requirements. The Orange County Sanitation District (OC San)
uses anaerobic digesters at both plants to stabilize sludge prior to dewatering. Anaerobic digesters
are large enclosed concrete structures that require pumping, mixing, heating, and gas handling
systems. Anaerobic digesters also generate methane gas used to produce power and heat.
OC San has 18 digesters at Plant No. 2 that were built from 1959 through 1979. A comprehensive
Biosolids Master Plan completed in 2017 recommended upgrading the existing digester complex by
adding Temperature Phased Anaerobic Digestion (TPAD) facilities.
TPAD Digester Facility at Plant No. 2, Project No. P2-128, is the first of four sequential projects
planned to ultimately replace the entire digester complex by 2040. The Preliminary Design Report for
this $455 million project was completed in January 2022.
Staff will present an update on the project and decisions used to control costs.
RELEVANT STANDARDS
·24/7/365 treatment plant reliability
·Safe, beneficial reuse of Biosolids
·Use all practical and effective means for resource recovery
Orange County Sanitation District Printed on 3/29/2022Page 1 of 2
powered by Legistar™
OC6SAN
ORANGE COUNTY SANITATION DISTRICT
File #:2022-2180 Agenda Date:4/6/2022 Agenda Item No:9.
ATTACHMENT
The following attachment(s)may be viewed on-line at the OC San website (www.ocsan.gov)with the complete agenda
package:
·Presentation
JM:jw
Orange County Sanitation District Printed on 3/29/2022Page 2 of 2
powered by Legistar™
3/29/2022
1
TPAD Digester Facility at Plant No. 2
Project No. P2‐128
Presented by:
Jeff Mohr
Engineering
Manager
Operations
Committee
April 6, 2022
Anaerobic Digestion is the Core of Solids Treatment
Raw
Sewage
Raw
Sludge Digesters
Digested
Sludge
(=Biosolids)
Solids Treatment
2
1
2
3/29/2022
2
Anaerobic Digestion
Sludge
Digested
Sludge
(Biosolids)
Digester Gas
3
•18 Digesters
•40‐60 years old
•Generally poor condition
•Seismic deficiencies can not be
cost effectively addressed
Status of Digesters
4
3
4
3/29/2022
3
Biosolids Master Plan (2017)
26 End‐to‐End Alternatives Considered
•Treatment Facilities
•Biosolids Product Options
•Reuse Markets
5
•Produce Class A Biosolids
•Food crop application (California, Arizona)
•Landscaping amendments
•Feed to compost
•Use Temperature‐Phase Anaerobic Digestion (TPAD)
•Sequential projects to replace entire digester complex
•Programmatic EIR completed
Master Plan Recommendations
6
5
6
■---
3/29/2022
4
7
Temperature‐Phased Anaerobic Digestion (TPAD)
Thermophilic
Digestion
Mesophilic
Digestion
131 ̊ F 98 ̊ F
Batch Tanks
Class A
Compliance
P2 Digester
Demolition
P2‐128
20‐Year Phased Implementation
8
7
8
2040
2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
CJ ,-... ,
j TPAD Digester Facility at j
1 Plant No. 2 1
•~------------~ I
, _______________________ ,
Phase 1 Mesophillic
Digester Replacement
)
3/29/2022
5
9
Digester Complex Future Plan
TPAD Digester Facility
2025‐2032
10
Digester Complex Future Plan
Phase 1 Mesophilic
Digester Replacement
2030‐2036
9
10
/ ··'{" D '
,/ n .~ ·''.(,z (;
3/29/2022
6
11
Digester Complex Future Plan
Phase 2 Mesophilic
Digester Replacement
2033‐2038
12
Digester Complex Future Plan
Digester Demolition
2040‐2042
11
12
' -j r'.
, \~>,
F \ \ \ ',
' ,-
:,;;l
' I
----\
-ti Clo
/ .y-D
,' I ,;,\'
/tJ1'. /, ,,/,''
/ .? . '.d :,,',<
, , ~,/ ,' . I ,/;{'-;j ,,.,::
3/29/2022
7
13
Digester Complex Future Plan
Preliminary Site Rendering
November 2021
Preliminary Design Report
14
13
14
"'
)
, --;J Cl-
/ ··•r D , ~ / I O •
//2,-'
/-:~·:_f
--~,.i(-.
/ _f3:' .. :;, i
_/ ~ <
' '
3/29/2022
8
On Schedule
P2‐128 Schedule
On Schedule 15
16
Construction Cost Estimate
$317 Million $330 Million
$373 Million
$333 Million
$0
$100,000,000
$200,000,000
$300,000,000
$400,000,000
Biosolids Master
Plan
Start Preliminary
Design
Draft Preliminary
Design Report
After Value
Engineering
Changes
15
16
2033
TPAD Digester Facility Construction Start Up
3/29/2022
9
Key Value Engineering Savings
$18M
17
Value Engineering Change Savings
Eliminate Standby Digester $18 Million
Remove Redundant Equipment $7.6 Million
Revised Site Layout $3.2 Million
Early Ground Improvement $3 Million
Direct Bury Piping $3 Million
Other $5.2 Million
Total $40 Million
Proposed Budget* $475 Million
Construction Cost $16 Million
Non‐Construction Costs $ 4 Million
Budget Status
* To be requested as part of the FY22‐23 and 23‐24 Budget.
18
Current Budget $455 Million
17
18
r-----,
3/29/2022
10
Questions
?
19
19
ORANGE COUNTY SANITATION DISTRICT
COMMON ACRONYMS
ACWA Association of California
Water Agencies LOS Level Of Service RFP Request For Proposal
APWA American Public Works
Association MGD Million Gallons Per Day RWQCB Regional Water Quality
Control Board
AQMD Air Quality Management
District MOU Memorandum of
Understanding SARFPA Santa Ana River Flood
Protection Agency
ASCE American Society of Civil Engineers NACWA National Association of Clean Water Agencies SARI Santa Ana River Interceptor
BOD Biochemical Oxygen Demand NEPA National Environmental Policy
Act SARWQCB Santa Ana Regional Water
Quality Control Board
CARB California Air Resources
Board NGOs Non-Governmental
Organizations SAWPA Santa Ana Watershed
Project Authority
CASA California Association of
Sanitation Agencies NPDES National Pollutant Discharge
Elimination System SCADA Supervisory Control And
Data Acquisition
CCTV Closed Circuit Television NWRI National Water Research
Institute SCAP
Southern California
Alliance of Publicly Owned Treatment Works
CEQA California Environmental
Quality Act O & M Operations & Maintenance SCAQMD South Coast Air Quality
Management District
CIP Capital Improvement
Program OCCOG Orange County Council of
Governments SOCWA South Orange County
Wastewater Authority
CRWQCB California Regional Water
Quality Control Board OCHCA Orange County Health Care
Agency SRF Clean Water State
Revolving Fund
CWA Clean Water Act OCSD Orange County Sanitation District SSMP Sewer System Management Plan
CWEA California Water Environment Association OCWD Orange County Water District SSO Sanitary Sewer Overflow
EIR Environmental Impact Report OOBS Ocean Outfall Booster Station SWRCB State Water Resources
Control Board
EMT Executive Management Team OSHA Occupational Safety and
Health Administration TDS Total Dissolved Solids
EPA US Environmental Protection Agency PCSA
Professional
Consultant/Construction
Services Agreement
TMDL Total Maximum Daily Load
FOG Fats, Oils, and Grease PDSA Professional Design Services
Agreement TSS Total Suspended Solids
gpd gallons per day PFAS
Per- and Polyfluoroalkyl
Substances WDR Waste Discharge
Requirements
GWRS Groundwater Replenishment
System PFOA Perfluorooctanoic Acid WEF Water Environment
Federation
ICS Incident Command System PFOS Perfluorooctanesulfonic Acid WERF Water Environment & Reuse Foundation
IERP Integrated Emergency
Response Plan POTW Publicly Owned Treatment
Works WIFIA Water Infrastructure
Finance and Innovation Act
JPA Joint Powers Authority ppm parts per million WIIN Water Infrastructure Improvements for the
Nation Act
LAFCO Local Agency Formation
Commission PSA Professional Services
Agreement WRDA Water Resources
Development Act
ORANGE COUNTY SANITATION DISTRICT
GLOSSARY OF TERMS
ACTIVATED SLUDGE PROCESS – A secondary biological wastewater treatment process where bacteria reproduce at a high rate with the introduction of excess air or oxygen and consume dissolved nutrients in the wastewater.
BENTHOS – The community of organisms, such as sea stars, worms, and shrimp, which live on, in, or near the seabed, also known as the benthic zone.
BIOCHEMICAL OXYGEN DEMAND (BOD) – The amount of oxygen used when organic matter undergoes decomposition by microorganisms. Testing for BOD is done to assess the amount of organic matter in water.
BIOGAS – A gas that is produced by the action of anaerobic bacteria on organic waste matter in a digester tank that can be used
as a fuel.
BIOSOLIDS – Biosolids are nutrient rich organic and highly treated solid materials produced by the wastewater treatment process. This high-quality product can be recycled as a soil amendment on farmland or further processed as an earth-like product for
commercial and home gardens to improve and maintain fertile soil and stimulate plant growth.
CAPITAL IMPROVEMENT PROGRAM (CIP) – Projects for repair, rehabilitation, and replacement of assets. Also includes treatment improvements, additional capacity, and projects for the support facilities.
COLIFORM BACTERIA – A group of bacteria found in the intestines of humans and other animals, but also occasionally found elsewhere, used as indicators of sewage pollution. E. coli are the most common bacteria in wastewater.
COLLECTIONS SYSTEM – In wastewater, it is the system of typically underground pipes that receive and convey sanitary wastewater or storm water.
CERTIFICATE OF PARTICIPATION (COP) – A type of financing where an investor purchases a share of the lease revenues of a program rather than the bond being secured by those revenues.
CONTAMINANTS OF POTENTIAL CONCERN (CPC) – Pharmaceuticals, hormones, and other organic wastewater contaminants.
DILUTION TO THRESHOLD (D/T) – The dilution at which the majority of people detect the odor becomes the D/T for that air sample.
GREENHOUSE GASES (GHG) – In the order of relative abundance water vapor, carbon dioxide, methane, nitrous oxide, and ozone gases that are considered the cause of global warming (“greenhouse effect”).
GROUNDWATER REPLENISHMENT SYSTEM (GWRS) – A joint water reclamation project that proactively responds to Southern California’s current and future water needs. This joint project between the Orange County Water District and OCSD provides 70
million gallons per day of drinking quality water to replenish the local groundwater supply.
LEVEL OF SERVICE (LOS) – Goals to support environmental and public expectations for performance.
N-NITROSODIMETHYLAMINE (NDMA) – A N-nitrosamine suspected cancer-causing agent. It has been found in the GWRS
process and is eliminated using hydrogen peroxide with extra ultra-violet treatment.
NATIONAL BIOSOLIDS PARTNERSHIP (NBP) – An alliance of the NACWA and WEF, with advisory support from the EPA. NBP is committed to developing and advancing environmentally sound and sustainable biosolids management practices that go beyond regulatory compliance and promote public participation to enhance the credibility of local agency biosolids programs and improved communications that lead to public acceptance.
PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) – A large group (over 6,000) of human-made compounds that are resistant to heat, water, and oil and used for a variety of applications including firefighting foam, stain and water-resistant clothing, cosmetics, and food packaging. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA) have been the focus of increasing regulatory scrutiny in drinking water and may result in adverse health effects including developmental effects to fetuses during pregnancy, cancer, liver damage, immunosuppression, thyroid effects, and other effects.
PERFLUOROOCTANOIC ACID (PFOA) – An ingredient for several industrial applications including carpeting, upholstery, apparel, floor wax, textiles, sealants, food packaging, and cookware (Teflon).
PERFLUOROOCTANESULFONIC ACID (PFOS) – A key ingredient in Scotchgard, a fabric protector made by 3M, and used in numerous stain repellents.
PLUME – A visible or measurable concentration of discharge from a stationary source or fixed facility.
PUBLICLY OWNED TREATMENT WORKS (POTW) – A municipal wastewater treatment plant.
SANTA ANA RIVER INTERCEPTOR (SARI) LINE – A regional brine line designed to convey 30 million gallons per day of non-reclaimable wastewater from the upper Santa Ana River basin to the ocean for disposal, after treatment.
SANITARY SEWER – Separate sewer systems specifically for the carrying of domestic and industrial wastewater.
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) – Regional regulatory agency that develops plans and
regulations designed to achieve public health standards by reducing emissions from business and industry.
SECONDARY TREATMENT – Biological wastewater treatment, particularly the activated sludge process, where bacteria and other microorganisms consume dissolved nutrients in wastewater.
SLUDGE – Untreated solid material created by the treatment of wastewater.
TOTAL SUSPENDED SOLIDS (TSS) – The amount of solids floating and in suspension in wastewater.
ORANGE COUNTY SANITATION DISTRICT
GLOSSARY OF TERMS
TRICKLING FILTER – A biological secondary treatment process in which bacteria and other microorganisms, growing as slime on the surface of rocks or plastic media, consume nutrients in wastewater as it trickles over them.
URBAN RUNOFF – Water from city streets and domestic properties that carry pollutants into the storm drains, rivers, lakes, and oceans.
WASTEWATER – Any water that enters the sanitary sewer.
WATERSHED – A land area from which water drains to a particular water body. OCSD’s service area is in the Santa Ana River Watershed.