Loading...
HomeMy WebLinkAbout10-02-2013 Board Packet - Special BOARD OF DIRECTORS ORANGE COUNTY SANITATION DISTRICT OCSD BOARD ROOM, ADMINISTRATIVE OFFICES 10844 ELLIS AVENUE FOUNTAIN VALLEY, CA 92708 TEL: (714) 593-7130 Wednesday, October 2, 2013 6:00 p.m. SPECIAL MEETING: Strategic Plan Board Workshop No. 2 Workshop Facilitator: Brent Ives, BHI Management Consulting AGENDA 1. Pledge of Allegiance 2. Declaration of Quorum 3. Public Comments 4. Welcome and Opening Remarks (Troy Edgar, Board Chair) Strategic Goals 2007-2013 5. Mission and Vision Statements (Brent Ives, Facilitator) 6. Strategic Initiatives (Jim Herberg, General Manager& Executive Management Team) a. Legislative Advocacy and Public Outreach Bob Ghirelli, Assistant General Manager b. Future Biosolids Management Options Nick Kanetis, Director of Engineering c. Odor Control Nick Kanetis, Director of Engineering d. Energy Efficiency Nick Kanetis, Director of Engineering e. Future Water Recycling Options Nick Kanetis, Director of Engineering f. Cessation of Disinfection of OCSD's Ocean Ed Torres, Director of Operations and Discharge Maintenance g. Local Sewer Transfers Nick Arhontes, Director of Facilities Support Services h. Workforce Planning and Workforce Jeff Reed, Director of Human Resources Development I. General Manager's Workplan Jim Herberg, General Manager 7. Board Discussion and Wrap-up (Brent Ives, Facilitator) 8. Adjournment October 2,2013 Page 2 Accommodations for the Disabled: Meeting Rooms are wheelchair accessible. If you require any special disability related accommodations, please contact the Orange County Sanitation District Clerk of the Board's office at (714) 593-7130 at least 72 hours prior to the scheduled meeting. Requests must specify the nature of the disability and the type of accommodation requested. Agenda Posting: In accordance with the requirements of California Government Code Section 54954.2,this agenda has been posted outside the main gate of the Sanitation District's Administration Building located at 10844 Ellis Avenue, Fountain Valley, California, not less than 72 hours prior to the meeting date and time above. All public records relating to each agenda item, including any public records distributed less than 72 hours prior to the meeting to all,or a majority of the Board of Directors,are available for public inspection in the office of the Clerk of the Board. NOTICE TO DIRECTORS: To place items on the agenda for the Committee Meeting, items must be submitted to the Clerk of the Board 14 days before the meeting. Mafia E.Ayala Clerk of the Board (714)593-7130 mavala(d)ocsd.com For any questions on the agenda,Committee members may contact staff at: General Manager Jim Herberg (714)593-7300 iherbem(Wocsd.com Assistant General Manager Bob Ghirelli (714)593-7400 rohirelli[dlocsd.com Director of Engineering Nick Kanetis (714)593-7310 nkanetis(Wocsd.com Director of Facility Support Services Nick Arhontes (714)593-7210 narhontesCaTocsd.com Director of Finance and Lorenzo Tyner (714)593-7550 Itvner(c0ocsd.com Administrative Services Director of Human Resources Jeff Reed (714)593-7144 imed(r@ocsd.cem Director of Operations&Maintenance Ed Torres 714 593-7080 elorres ocsd.com Strategic Goals 2007 - 2013 FY Completed Targetfor Goal Completion FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 SARI Line Relocation-Work in conjunction with the County of Orange and the Federal Government to relocate the SARI Line by December 31, 2013. Management System for Environmental Compliance- Implement a management control system for environmental compliance information that incorporates a dashboard-style report. Contaminants of Potential Concern(CPC)-Complete three phase testing and analysis of 550+CPC, prepare report on findings and recommendations, develop initial source control strategy if they are CPCs identified that require control. Climate Change/Greenhouse Gases Develop an overall strategy for responding to climate change regulations and proactively adapting to the effects of climate change including identification and mitigation of greenhouse gases and adapting to any impacts to our facilities and operations. Develop models to estimate greenhouse gas and traditional pollutant emissions for determination of our environmental • footprint. (Functional predictive greenhouse gas model completed). Engine Emission Compliance Complete study to evaluate alternatives for complying with lower emission limits in the South Coast Air quality Management's Rule • 1110.2. Initiate planning and design of demonstration testing of most promising technology(s) identified in the study. Implement capital improvements or operational modifications in • order to achieve compliance. Page 1 of 5 Strategic Goals 2007 - 2013 FY Completed Targetfor Goal Completion FY 07-08 FY 08-09 FY 09-10 FY 30-11 FY 11-12 FY 12-13 FY 13-14 Fuel Cell Evaluation Start up 300kW demonstration unit. Evaluate cost feasibility of replacing or supplementing CGS engines with fuel cell. Reclaiming Santa Ana River Interceptor Line(SARI) Flows-Meet with stakeholders,develop a list of obstacles that need to be overcome to reclaim the SARI Line and develop a strategy to obtain regulatory approval of reclaiming SARI Line flows. This goal was canceled due to inability to obtain regulatory approval. Sewer Rate for Green Development-Submit for Board approval an amendment to sewer rate ordinance with incentives for green developments. Complete Facilities Master Plan Update—Complete a comprehensive update of the Facilities Master Plan and obtain Board approval. Enterprise Information Technology Strategic Plan—Complete a District wide Information Technology Strategic Plan. Updating OCSD's Risk Register—Review and update OCSD's risk register to include an assessment of technical, regulatory,financial,and political risks (among others) and possible mitigation strategies. Annex Unincorporated Areas—With Board concurrence, annex unincorporated areas onto OCSD's service area. Review Interagency Agreements—Conduct a comprehensive review of agreements with the Santa Ana Watershed Project Authority and Irvine Ranch Water District, and, if appropriate, reopen for discussion. Strategic Business Plan—With Board concurrence,annually update and implement the Strategic Plan and Business Plan. Page 2 of 5 Strategic Goals 2007 - 2013 FY Completed Targetfor Goal Completion FY 07-081 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 Business Accountability Charters—Create Business Accountability Charters for each department consistent with those developed by managers and supervisors. Chemical Supplies—Develop a Chemical Sustainability Plan that provides OCSD with options for obtaining wastewater treatment chemicals during chemical shortages,emergencies or complete stoppages. Chemical Sustainability-Ensure a reliable and sustainable chemical supply using multiple vendor contracts to reduce the risk of supply disruption while benefiting from competitive pricing. Full-Cost Recovery 2010-11-Conduct a comprehensive review of the Sanitation District's Urban Runoff Program to ensure a fair share recovery of costs for services. Full-Cost Recovery 2012-13-Implement a direct charging mechanism to recover the full cost of urban runoff treatment starting July 1, 2013 when the new rate structure is in place. This goal was canceled in FY 12-13 to allow additional urban runoff at no cost to the local "urisdiction. Groundwater Replenishment System- Maximize the production of GWR System product water to augment and protect the Orange County groundwater basin with a goal of 70 mgd. Sustainable Biosolids Program Complete new in-county Compost Take-Back Program Plan • Strategy. Evaluate the feasibility of deep injection/methane recovery including commissioning a study of the geological formations • below Plants 1 and 2, and availability and acceptability of any existing wells. Evaluate option at processing some biosolids at the City of Los Angeles Terminal Island demonstration well. Page 3 of 5 Strategic Goals 2007 - 2013 FY Completed Targetfor Goal Com letion FY 07-08 FY O8-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 Implement Energy Master Plan—After the completion of the plan, assess final recommendations to ensure adequate power resources and • energy management. Disinfection of Final Effluent-Develop a cost effective program to sustain protection of public health associated with bacteria in the • effluent and incorporate program elements into our NPDES Permit. Ocean Protection—Undertake studies to determine the cause of benthic community changes near the ocean outfall and take corrective • action to return affected areas to reference conditions. Space Planning Study Recommendations—Complete relocation of staff housed in Information Technology Trailers,Administration Building, • Control Center and Building 6. Improve the Sanitation District Security- Provide long-term security enhancements at both treatment plants and within OCSD's Collection • System. Safety and Health Strategic Plan—Develop and implement a Safety and Health Strategic Plan for all OCSD activities. • Human Resources Strategic Plan-Design,develop and implement human resources policies, practices,systems and tools to ensure OCSD • has a workforce that meets future needs of OCSD and the public it serves. Succession Plan-Implement the Succession Management Plan including management training and the creation of a Leadership • Academy. North County Yard—Open the North County Maintenance Yard and complete the relocation of selected staff and equipment to the facility. Implement flex space for added agency-wide needs as appropriate. • This goal was canceled in FY 10-11 and the facility is currently being leased. Five-Year Rate Plan—Prepare an updated 5-year rate schedule for • Board consideration to go into effect July 1,2013. Page 4 of 5 Strategic Goals 2007 - 2013 FY Completed Targetfor Goal Com letion FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 Sustainable eiosolids Program-Conduct research to reduce the amount of biosolids produced and increase digester gas production. • Odor Control—Implement odor control projects at Plant 1 (trickling filters)and Plant 2(solids loading facility) by 2018. Targetedjor • completion in FY 15-16 and FY 17-18 Providing Ongoing Leadership Development-Maximize the development of a pool of dedicated and talented employees ready to • lead OCSD into the future. Local Sewer Transfer-Complete the transfer of local sewers to member agencies and cities,focusing on completion of the Tustin • transfer. Page 5 of 5 OCSD's Mission Statement "We protect public health and the environment by providing effective wastewater collection, treatment, and recycling." OCSD Draft Board Vision Statement OCSD will be a leader in: — Providing reliable, responsive and affordable services in line with customer needs and expectations. — Protecting public health and the environment utilizing all practical and effective means for wastewater, energy, and solids resource recovery. — Continually seeking efficiencies to ensure that the public's money is wisely spent. — Communicating our mission and strategies with those we serve and all other stakeholders. — Partnering with others to benefit our customers, this region and our industry. — Creating the best possible workforce in terms of safety, productivity, customer service, and training. ISSUE PAPER: Legislative Advocacy and Public Outreach Should OCSD expand its legislative advocacy and public outreach efforts? Why is this issue important to the District? As a special district, we owe it to our ratepayers to keep them apprised of our efforts to accomplish our mission of protecting public health and the environment. A Prop 218 notice is among the only points of communication that we have with our customers. It is far more effective for OCSD to reach out to the communities we serve throughout the year to describe our cost-management efforts, our budget process, clean audits, and capital improvement projects. As the largest regional wastewater utility in Orange County, and the third largest west of the Mississippi River, OCSD recognizes the need for an active state and federal legislative advocacy program to ensure that the interests of the ratepayers and board of directors are protected. Towards that end, staff monitors activities in Sacramento and Washington, D.C., and, with the assistance of our legislative advocates,takes appropriate action to support or oppose legislative initiatives. A unified legislative advocacy and public outreach program is essential in delivering our messages and positioning the District as a leader in our field. Goals • Establish a special committee of the board of directors to oversee and guide development of the legislative and public outreach program. • Develop a legislative advocacy strategic plan to set priorities for state and federal elected official outreach. • Track bills and legislative activities. • Identify and pursue grant funding opportunities. • Analyze and lobby on behalf of proposed legislation that may impact the District. • Carry out public outreach and legislative advocacy activities in support of the policy guidance contained in the strategic plan. • Promote What 2 Flush outreach program that educates the public about the importance of infrastructure investment and supports the District's mission to protect the public's health and the environment. Desired Outcome • Position OCSD as a leader in innovative solutions to infrastructure issues. • Secure additional funding for OCSD programs. • Educate the public about OCSD's purpose, mission and the services we provide. ISSUE PAPER: Future Biosolids Management Options Should OCSD study potential biosolids management options ahead of the 2016 Request for Proposals? Why is this issue important to the District? OCSD's biosolids management contract with Synagro expires in December 2016. OCSD is sending up to half of its daily biosolids production to Synagro composting facilities in Kern County, California and La Paz County, Arizona since 2002. The last full-scale biosolids management study was completed in 2003. Since that time, new biosolids management options have been developed, the markets for and regulations impacting biosolids management have changed, and the economy has weakened. All of these events have resulted in more biosolids management markets with more competitive pricing. Although there is an option to renew the Synagro contract, staff recommends studying biosolids management options to ensure that OCSD obtains the fairest price for its future biosolids management. Studying the current market for available biosolids management options prior to selecting a new management option or renewing the contract would ensure that OCSD has the necessary information to implement the best strategy, as well as providing OCSD staff with the knowledge on how to improve the purchasing process or develop a capital project. Due to the large costs involved in biosolids management contracts, staff seeks to develop the fairest process with the most beneficial outcome. The 2003 Long-Range Biosolids Management Plan resulted in guidelines for the diversification of biosolids products, contractors, and markets to create a sustainable biosolids program. The updated biosolids policy (2013 Board Resolution No. OCSD 13-03) commits OCSD to a diverse portfolio of biosolids options and to recycle biosolids, among other requirements. A study of current and available biosolids recycling options will assist OCSD in selecting the right option to ensure conformance with the biosolids policy regarding diversity of management options and other criteria. Ahead of the selection of the next biosolids management option, staff recommends studying mid-term (4-10 years) and long-term (10+ years) strategies for biosolids management available after 2016-17 when the Synagro contract expires, IRWD stops sending OCSD their solids, and centrifuges come online thereby reducing our biosolids production by one-third. The study of biosolids management options will include off-site and on-site facilities, new and established technologies, and biosolids markets, as well as ensuring onsite strategies are aligned with any new recommendations and research. Goals • Study available biosolids management options and costs relevant and applicable to OCSD's daily biosolids production; • Verify available biosolids managements options align with new capital facilities and meet established levels of service; • Identify practical and reasonable biosolids management options considering OCSD's Biosolids Policy and relevant research information; • Develop a mechanism to allow for short-term demonstrations of viable biosolids management options; • Develop a strategy to select a management contractor or capital project for biosolids management in the mid-term and long-term timeframe. Desired Outcome • OCSD will have a clear mid-term and long-term strategy for biosolids management (beginning after fiscal year 2016-2017) when the existing composting contract expires, centrifuges begin operation, and daily biosolids production is reduced by one-third. Consider on-site options. • Maintain a sustainable biosolids management program in accordance to OCSD's Biosolids Policy that includes diversification of products, markets, and contractors. ISSUE PAPER: Odor Control Should OCSD update its Odor Control Master Plan to validate the District standards for levels of service,scope and priority for facilities improvements? Why is this issue important to the District? Although odors are inherent to wastewater, OCSD maintains a good neighbor policy to not be a nuisance to its neighbors. Controlling nuisance odor represents a significant operational and capital expense to OCSD. In 2007 the Levels of Service (LOS) for Odor Control were adopted by the Board as part of the Five-Year Strategic Plan. The District adopted a dilution to threshold (D/T) measurement system for a level of service goal. The standard was set for 14 D/T at Plant No. 1 by 2016 and 17 D/T at Plant No. 2 by 2018. This means that no odors leave the plant boundaries and affect surrounding communities. Staff believes that offsite odor impacts have been significantly reduced since the adoption of the 2007 LOS Standards. The District is continuing with its collection system chemical dosing program on four of eleven trunklines. This continuous dosing approach helps reduce corrosion and odors in the collection system and headworks of both treatment plants. Additionally, a significant number of projects have been completed, some including new odor control technologies. Projects completed since the 2007 LOS adoption that reduce offsite odor impacts include: • Steve Anderson Lift Station at Plant No. 1 • Trickling Filters at Plant No. 2 • Headworks replacement at Plant No. 2 • Solids Thickening and Processing Upgrades at Plant No. 2 • Conversion of the Plant No. 1 Headworks Scrubbers from hydrogen peroxide to bleach. • Conversion of the Plant No. 2 Primary Scrubbers from hydrogen peroxide to bleach. The following projects are in the design or construction phases that will further reduce offsite odor impacts: • Sludge Thickening/Dewatering and Odor Control at Plant No. 1 • Trunk Line Odor Control Improvements at Plant No. 1 Headworks. • Sludge Dewatering and Odor Control at Plant No. 2 Much of the basis for the work originally planned while adopting the current odor control standard was based on engineering studies and assumed process performance for new or altered process technologies. Recent testing of a portion of the installed odor control systems shows their performance differing from planning expectations. Thus, before moving ahead on new odor control projects, further performance assessment of the installed odor systems, including the secondary treatment facilities at both Plants and the new Headworks at Plant 2, is appropriate. Also, new odor measurement technologies have been developed since 2007, which may provide a better odor-impact measurement than the current D/T based LOS standard. Staff is proposing to invest the time and effort to conduct a performance assessment of the existing odor systems and potentially develop alternatives for the existing D/T based LOS standards. Goals • The performance of completed odor control projects should be thoroughly evaluated to assess the actual performance versus original performance assumptions. (This will be done through an update of the Odor Control Master Plan Project SP3-166.) • Future planned odor control projects involving the following Plant 1 processes - Headworks, Trickling Filter and Primary Basins, and Plant 2 Primary Basins should be combined with Asset Management scopes of work to implement comprehensive refurbishment plans that limit offsite odor impacts on a priority basis. • Reassess whether dilution to threshold is the most appropriate measurement system. This may include investigating odorant based measurement systems, or shifting the dilution to threshold system to the Engineering Design Guidelines for future comprehensive Asset Management based project designs, or develop a new level of service recommendation as part of the odor control Master Plan (SP-166). • Assess retaining the odor complaint level of service measurement and reporting system, modifying our goal to achieve no offsite odor complaints during normal process operations. Desired Outcome • The District remains committed to being a good neighbor and limiting offsite odor impacts in a comprehensive and cost effective manner. Completion of the Odor Control Master Plan is necessary to make sure the District's investment is current and, if needed, future process systems will produce the benefits intended. ISSUE PAPER: Energy Efficiency Should OCSD continue to expand the creation and utilization of renewable energy in wastewater management? Why is this issue important to the District? OCSD and its contractors are a significant consumer of energy. Energy is procured in the forms of electricity, natural gas, diesel fuel and gasoline. In addition, the organic sludge recovered in the wastewater treatment process is an energy rich resource which OCSD has been converting into electricity and heat for many years. OCSD seeks to minimize its overall energy usage and maximize the conversion of sludge to energy. Minimizing energy usage is designed into every project constructed by the OCSD. Capital dollars are expended when a lifecycle payback is calculated for energy efficiency. Variable speed pumping systems, ultra efficient electrical motors, and efficient aeration systems for our Activated Sludge Plants are examples of component selection for long term energy efficiency. Energy utilization is a significant factor in process technology selection when unit processes are added or replaced. Examples of this include using Trickling Filters rather than Activated Sludge Plants, and creative designs to replace collection system pump stations with gravity lines. Transportation fuels are also optimized by selection of advanced technology options. OCSD is investing in biosolids dewatering technology to reduce diesel costs and emissions for hauling biosolids. OCSD is also a leader in the conversion of organic sludge to energy. OCSD has operated anaerobic digestion which uses bacteria to convert sludge to methane gas. The methane has been used to fire boilers and generators. The reduction of sludge volume and the use of heat to pasteurize the sludge creates a useful fertilizer product with lower volume and corresponding diesel fuel input to haul the product to farms. Goals • Complete the fuel cell research evaluation and make a recommendation to the Board of Directors. • Continue to design energy efficiency into every project. • Search for new research opportunities to improve conversion of organic sludge to energy. • Search for new research opportunities to optimize processes energy and hauling energy. Desired Outcome • Reaffirm the OCSD commitment to leadership in energy efficiency and energy conversion from organic sludge to electricity,gas, and useful heat. ISSUE PAPER: Future Water Recycling Options Should OCSD study the possibility of expanding water recycling to Treatment Plan No.2 in Huntington Beach? Why is this issue important to the District? Water demands are forecasted to increase in north and central Orange County, emphasizing the importance of water recycling to boost local water resources and reduce dependence on imported water. Estimated water demands in the OCSD and Orange County Water District service area are projected to increase from approximately 480,000 acre-feet per year up to 558,000 acre-feet per year in 2035 (OCWD, "Long Term Facilities Plan", 2009). Presently, about one-third of the area's water demands are supplied with imported water. To bolster local supplies, OCSD and OCWD have jointly sponsored renowned water recycling projects such as the Groundwater Replenishment System and the Green Acres Project. Yet, about half of OCSD's treated wastewater is lost to ocean disposal. Treated wastewater from OCSD's Plant 2 could be used as source water for water recycling, via groundwater recharge, a purple pipe irrigation system, and/or wetlands restoration. This Project will help OCSD, along with its partner OCWD, determine if Plant 2 effluent could be used as feedwater to support expansion of the Groundwater Replenishment System or for a new reclamation facility. More water recycling will help serve Orange County's escalating water demands, maximizing local water independence, enhancing supply reliability, restoring and protecting wetlands, and shielding against droughts. Goals • Develop alternative treatment and utilization alternatives for Plant No. 2 effluent including potential technologies and partnerships; • Create an evaluation methodology to weigh the benefits, costs, and risks of each alternative; • Compare alternatives and make recommendations for the best apparent project(s) and partner(s)to be implemented. Desired Outcome • OCSD will begin to plan for the highest and best utilization of effluent water at Treatment Plant No. 2. ISSUE PAPER: Cessation of Disinfection of OCSD's Ocean Discharge Should OCSD stop the disinfection of effluent? Why is this issue important to the District? During the summer of 1999, stretches of Orange County beaches were closed due to elevated levels of fecal indicator bacteria. In response, Orange County Sanitation District (OCSD) and numerous other organizations conducted extensive studies to determine the source(s) of this contamination. The outcome of these studies recognized several potential sources, including birds, Talbert Marsh and the Santa Ana River discharge, and groundwater contamination. A trunk line near the coast and the effluent plume discharging from the OCSD's 5 mile outfall were also investigated, but were not found to be contributing sources of bacterial contamination. However, in an effort to be proactive and insure protection of public health, in 2002 OCSD began disinfection of its final effluent using chlorine at both treatment plants as a temporary measure to eliminate any uncertainty. In 2006, OCSD observed degradation of marine life near the ocean outfall. Staff conducted 10 individual studies targeting potential causes for these observed effects. Results showed that the OCSD's use of chlorine for ocean outfall disinfection was highly correlated with the observed effects and is therefore the likely cause of the decline in biological communities near the outfall. In addition, staff performed a historical analysis using the most recent 14 years of bacterial data from beaches monitored by OCSD in order to assess if public health protection improved since the initiation of OCSD's disinfection of its ocean discharge. The results from this assessment showed that disinfection of OCSD wastewater at an average annual cost of$4.18 million dollars over the 14 year period had no measurable public health benefit. Regardless of disinfection, bacteria concentrations did not change significantly either temporally or spatially at Orange County beaches. A 2008 review of OCSD's disinfection practices by a 9 member independent panel of experts organized by the National Water Research Institute produced a recommendation to re-evaluate the need for disinfection once full-secondary treatment was achieved. With full secondary treatment now in place, these studies indicate no public health benefit has been gained; there are negative impacts to the biological community near OCSD's ocean outfall and going forward disinfection is costing OCSD's rate payers approximately$500,000 annually. Goal • Cessation of disinfection of OCSD's effluent. Desired Outcome • Requirement to disinfect long outfall removed from our ocean discharge permit. • Full recovery of marine life around the ocean outfall ISSUE PAPER: Local Sewer Transfers Should the Sanitation District continue its efforts to transfer local sewers to member cities and sewering agencies? Why is this issue important to the District? Our Strategic Plan of November 2007 recommended transferring back to cities local assets that are not serving a true regional purpose. Successor Strategic Plans reaffirmed this initiative. This allows us to focus staff full attention on the medium and larger diameter regional sewer pipes and pumping facilities that we own and operate, i.e., our core business. Background Since 1984 we successfully transferred 61 miles of our sewers and 2 pumping facilities to member cities and sewering agencies. Most recently we transferred 3 miles of local sewers to the City of Anaheim. We anticipate completing the transfer of an additional 174 miles of local sewers serving parts of Tustin and unincorporated areas north of Tustin by December 31, 2013. OCSD Resolution No. 11-11 provides the criteria for classifying a local facility as compared to a regional facility. Regional facilities transport combined flows from two or more jurisdictions. Local facilities are directly connected to the properties they serve and allow the local utility to assess and collect local fees for service including reserves for future replacement. Local facilities also transport flows within the boundaries of the city or sewering agency to the point of connection at the downstream OCSD regional sewer. Discussions are underway with staff in Newport Beach, Huntington Beach, Santa Ana, Orange and Costa Mesa Sanitary District to transfer about 72 miles of sewers and 6 pumping facilities serving local only purposes. All cities and sewering agencies must establish appropriate local fees for services as mandated by state regulations. The GM's FY 13/14 Proposed Work Plan recommends that we seek the Board's input on whether to continue to pursue transfers of local sewers and pumping facilities to local sewer agencies. Desired Outcome • Gain Board support for the current direction as is or, • Seek Board input and support for desired changes in the current Resolution or program. ISSUE PAPER: Workforce Planning & Workforce Development Should OCSD advance the workforce planning and workforce development initiative as a means to ensure workforce capabilities match the work required to meet the mission and levels of service? Why is this issue important to the District? OCSD continues to face staffing challenges. From March 2010 to date, 110 employees left OCSD taking 1,985 years of knowledge and experience with them. Based on retirement eligibility today, analysis of OCSD core wastewater occupations and management positions indicates potential job replacement rates of over 38% and 57%, respectively. Robust technical skills training and leadership development efforts are in place to deal with the challenges. While much has been done on this initiative, more remains to be done. It is essential that OCSD continues to act on preparing for future staffing needs and ensuring access to qualified applicants while developing the existing workforce. The workforce planning and workforce development (WFPD) programs position organizations for improved performance by ensuring that workforce capabilities match the work required to meet their mission and levels of service. To that end, it is important to have a diverse, competitive group competing for a position instead of simply hiring the next person in line based on time on the job.This Initiative will continue to help OCSD get the right people with the right skills in the right positions at the right time. Ongoing efforts aimed at District-wide WFPD activities are necessary to ensure the ongoing delivery of efficient and effective levels of service and to meet our mission. Workforce planning reinforces authorized staffing levels while addressing future needs and changing work requirements. Workforce development strengthens the workforce by preparing employees for future opportunities and focusing efforts on growth of technical skills to ensure staff is well- trained. It is important that WFPD remains elevated at the level of an OCSD Strategic Plan Goal for the Board to emphasize to District management that this is an issue requiring organization-wide attention and resource allocation. Goals • Develop and implement workforce plans that ensure critical work is performed, identify new ways to perform work, and meet future workforce needs. • Enhance OCSD's ability to recruit highly qualified, diverse staff. • Develop employees to meet workforce demands. • Actively manage employee performance to ensure OCSD goals are met. • Create an environment that encourages retention of employees. Desired Outcome • Integrate WFPD efforts to ensure workforce capabilities match work required to meet the mission and levels of service. GENERAL MANAGER'S WORKPLAN: Asset Management Update and Action Plan Enhance our asset management process for Infrastructure longevity and increased lifecycle cost savings. Why is this issue important to the District? OCSD owns and operates$6.2 billion in infrastructure assets to collect,treat, reuse,and safety discharge wastewater in North-Central Orange County. This infrastructure requires significant oversight to ensure safe and reliable operation. OCSD's asset portfolio includes a wide variety of asset types, service conditions, installation dates,and technology levels. OCSD has been actively developing published Asset Management Plans for more than a decade. The plans and management techniques are increasing in sophistication and effectiveness. OCSD is recognized as a leader in predictive maintenance, corrosion assessment,capital planning,and budgeting. In the area of operations and maintenance, OCSD is working to build on this solid foundation by improving the maintenance planning and implementation of preventative maintenance services for its civil assets. Civil assets are infrastructure such as buried pipelines, concrete flow structures, wet wells, pump systems, basins, and tunnels. These civil assets represent the longest life and highest value assets in OCSD's portfolio. Prudent life extension of these types of assets represents a very large lifecycle cost savings opportunity. In the area of capital planning, OCSD is working to systematically refurbish and renew its plant process systems and collection system on an on-going basis. Each plant process area should have a refurbishment/renewal plan at least every twenty years. Each project will consider capacity requirements, condition of current assets, technology options, and current, as well as projected, regulatory requirements. In this way OCSD will make conscious end of asset life decisions to minimize costs and utilize appropriate available technology. Goals • Adopt operating and maintenance routines that minimize cost and maximize asset availability. • Extend the life and resiliency of infrastructure assets. • Synchronize maintenance and capital project planning. • Identify end of life time frames for process assets and investigate replacement technology opportunities. • Invest prudently in technology and renewal to minimize lifecycle cost while meeting performance and reliability requirements. Desired Outcome • Maintain resilient, cost effective infrastructure which protects public health and the environment. GENERAL MANAGER'S WORKPLAN: Business Risk Management and Safety and Security Ensure continuous operations,business continuity and employee safety before and after a catastrophic event or resource shortage%utage. What steps has OCSD taken and what future activities will support this effort OCSD is a vital 24 hour, 7-days a week operation that provides wastewater services to 2.6 million people. It is critical that that the District is always in a position to provide these services uninterrupted. However, there are various potential risks that could impact OCSD's ability to provide these services. The risks vary from sustained power outage, chemical shortages to major earthquake or tsunami. As part of the General Manager's Annual Work Plan this item is included to ensure that OCSD is prepared for these events. Staff has begun the following efforts: 1) Risk Mitigation through identification OCSD continually undertakes a comprehensive review of readiness in the event daily operations are interrupted and put in place emergency response plans to address identified risks. To assist in this review, OCSD has developed a comprehensive Risk Register. OCSD surveys its managers and operational staff to better understand potential operational and business risks and threats to the agency and updates the register annually. Based on the results, plans are developed, resources allocated and a summary of the register included in the annual budget. Additionally, OCSD works with nearby cities and emergency services providers in preparation of a significant event through onsite inspection, scenario planning and tabletop exercises. OCSD is also part of mutual aid groups to ensure that we always access to required equipment and resources 2) Safety and Security The safety of our employees and physical security of our facilities are a priority. As such, we proved extensive training and monitor of our employees, allocating nearly $1 million in training. Staff is working with OSHA and outside evaluators to obtain OSHA Voluntary Protection Programs (VPP) certification. Risk Management and operational staff work with Department Homeland Security to obtain their feedback to ensure the physical security of our facilities. 3) Business Continuity OCSD had developed varies risk mitigation and management strategies, chief of which is the District's Business Continuity Plan. Business continuity planning (BCP) "identifies an organization's exposure to internal and external threats and synthesizes hard and soft assets to provide effective prevention and recovery for the organization, while maintaining competitive advantage and value system integrity". A business continuity plan is a roadmap for continuing operations under adverse conditions. Staff meets with various government agencies including cities, ports and infrastructure providers to assist in developing an OCSD BCP that prepares our agency for a catastrophic and event and ensures our ability to provide our critical services. Desired Outcome • That OCSD is in a continually state of readiness and is always in a position to provide its critical services to the public. GENERAL MANAGER'S WORKPLAN: Operational Efficiencies Continually seek operating efficiencies. Why is this issue important to the District? OCSD's operating budget is $153 million of which 75% of this budget is managed by the Operations & Maintenance and Facilities Support Services departments. These departments are committed to continually evaluating and optimizing its operations to maximize efficiency and ensure best practices are exercised where applicable. One method Staff uses to evaluate our efficiency in delivering services is through benchmarking studies where we have compared various elements of our operations (e.g. Staffing, odor control, laboratory operations) with other agencies to measure ourselves against industry standards and to identify ways to streamline operations and reduce fiscal impacts to customers. A few examples of the recent efficiencies achieved are provided: • In 2011 and 2012 OCSD replaced an aging headwork at our Huntington Beach plant with a large state of art facility that substantially increased the number of control points being monitored, and began full secondary treatment of its effluent. The completion of these two projects added large and complex new facilities and processes at both plants yet staffing levels were not increased and staff safety was not compromised. This was achieved by expanding our predictive maintenance program, moving to a more planned and scheduled maintenance program and reallocating and broadening the responsibilities of plant operations staff. • Another accomplishment has been in the area of biosolids management where through optimizing the dewatering process, OCSD is saving over$1 million in hauling expenses. • Chemicals are a major part of the District's budget. Over the last few years, staff has worked towards identifying ways to optimize to reduce both the cost of chemicals and the levels being used. A prime example would be the recent negotiation of Ferric Chloride contracts with 4 vendors as opposed to the single vendor OCSD has relied on for over fifteen years. By successfully negotiating contracts with additional Ferric Chloride vendors, staff has reduced our annual costs over $600,000, while significantly reducing the potential for supply disruption. Goal • Implementation of predictive maintenance strategic plans • Implementation of planning&scheduling best practices plan • Continue to evaluate technology, process optimization, in-sourcing vs. outsourcing services and administrative opportunities to operate more efficiently Desired Outcome • Safe and cost-effective operation and maintenance of OCSD facilities while meeting all Levels of Service expectations