HomeMy WebLinkAbout10-23-2013 Board Meeting Agenda Packet Orange County Sanitation District Wednesday, October 23,2013
Regular Meeting of the 6:30 P.M.
Board of Directors Board Room
10844 Ellis Avenue
Fountain Valley, CA 92708
it (714)593-7130
AGENDA
INVOCATION AND PLEDGE OF ALLEGIANCE: (Troy Edgar, City of Los Alamitos)
ROLL CALL & DECLARATION OF QUORUM:
PUBLIC COMMENTS: If you wish to speak, please complete a Speaker's Form (located at the table
outside of the Board Room) and give it to the Clerk of the Board. Speakers are requested to limit
comments to three minutes.
REPORTS: The Chair and the General Manager may present verbal reports on miscellaneous matters
of general interest to the Directors. These reports are for information only and require no action by the
Directors.
CLAIMS:
DIRECTORS., Pursuant to Government Code Section 84308, you are required to disclose any campaign
contribution greater than $250 received in the past twelve months from any party seeking a contract with
OCSD. This requires that you identify the contributor by name. Further, you may not participate in the
decision making process to award a contract to such party. For reference, you are directed to the
Register of Warrants as to all current contractorsIvendors with OCSD. For the specifics of Government
Code Section 84308,please see your Director's Handbook or call the office of General Counsel.
1. Ratify payment of claims of the District, by roll call vote, as follows:
Claims Paid for the Period Ending: 09/15/13 09/30/13
Totals $ 6,975,614.42 $ 11,395,868.49
10/23/13 OCSD Board of Directors Agenda Page 1 of 6
CONSENT CALENDAR: Consent Calendar Items are considered to be routine and will be enacted,
by the Board of Directors, after one motion, without discussion. Any items withdrawn from the Consent
Calendar for separate discussion will be considered in the regular order of business.
2. A. Approve Minutes for the Regular Board Meeting held on September 25,
2013; and
B. Approve Minutes for the Special Board Meeting held on October 2, 2013.
3. A. Approve Plans and Specifications for Boiler System Rehabilitation and
Scrubbers H & I Demolition at Plant No. 2, Project No. P2-106, on file at
the Office of the Clerk of the Board; and
B. Approve Addendum Nos. 1 and 2 to the plans and specifications; and
C. Award a construction contract to Irwin Industries for the Boiler System
Rehabilitation and Scrubbers H & I Demolition at Plant No. 2, Project No.
P2-106, for a total amount not to exceed $1,472,993; and
D. Approve a contingency of$147,299 (10%).
4. A. Authorize staff to detach 171.55 acres from the Orange County Sanitation
District in the vicinity of Laguna Canyon Road, within the City of Laguna
Woods; and,
B. Adopt Resolution No. OCSD 13-15, authorizing initiation of proceedings to
detach said territories from the Orange County Sanitation District service
area (Proposed Detachment No. DO 13-10 — Laguna Woods
Detachment).
STEERING COMMITTEE:
5. Approve Minutes for the Steering Committee Meeting held on September 25,
2013.
6. A. Receive and file a letter from the City of Yorba Linda dated October 16,
2013 requesting a transfer of its seat on the OCSD Board of Directors to
the Yorba Linda Water District; and
B. Direct staff to prepare a legislative proposal to transfer the City of Yorba
Linda's seat on the OCSD Board of Directors to the Yorba Linda Water
District.
OPERATIONS COMMITTEE:
7. Approve Minutes of October 2, 2013, Operations Committee meeting.
10/23/13 OCSD Board of Directors'Agenda Page 2 of 6
8. Approve Amendment No. 1 to the Facilities Engineering Task Order No. 12-00-
04-01 with Tran Consulting Engineers providing additional design and
construction services for Slater Ave Pump Station VFD Replacement, FR12-012,
for an additional amount of $26,968, increasing the total not to exceed amount to
$66,931.
9. A. Award a service contract to the lowest responsive and responsible bidder,
CDC Engineering & Technology, for P1 Potable Water Valve
Replacement, Project No. FR11-020 for a total amount not to exceed
$412,000; and,
B. Approve a contingency of$82,400 (20%).
10. A. Award a service contract to the lowest responsive and responsible bidder,
Mode Engineering, for Warner Avenue Relief Sewer Manholes Structural
Repairs, Specification No. FR12-003 for a total amount not to exceed
$338,000; and,
B. Approve a contingency of$67,600 (20%).
11. Approve Revision No. 1 to the Black & Veatch PLAN2010-01, Task Order 05
(Ocean Outfall Assessments, Project SP-187) in the amount of $19,569 for
additional engineering services to develop Ocean Outfall Booster Station
refurbishment scope of work items, for a total amount not to exceed $67.593.
12. A. Approve a Professional Consultant Services Agreement with Dudek &
Associates, Inc. to provide construction support services for Boiler System
Rehabilitation and Scrubbers H & I Demolition at Plant No. 2, Project No.
P2-106, for an amount not to exceed $222,503; and,
B. Approve a contingency of$22,250 (10%).
13. A. Approve a budget increase of $390,000 for the Bitter Point Force Main
Rehabilitation, Project No. 5-58, for a total project budget of $46,219,000;
and,
B. Approve an increase in contingency of $89,445 (15%), for a total
contingency of $149,075 (25%), to the Professional Consultant Services
Agreement with Black & Veatch to provide construction support services
for the Bitter Point Force Main Rehabilitation, Project No. 5-58, to support
the Santa Ana River Levee and In-Plant Repairs, Phase 2.
ADMINISTRATION COMMITTEE:
14. Approve Minutes of the October 9, 2013 Administration Committee Meeting.
1012N13 OCSD Board of Directors Agenda Page 3 of 6
NON CONSENT CALENDAR:
15. A. Motion to read Ordinance No. OCSD-XX by title only and waive reading of
said entire Ordinance on October 23, 2013; and
B. Introduce Ordinance No. OCSD-XX, entitled "An Ordinance of the Board
of Directors of Orange County Sanitation District Establishing
Requirements and Procedures for the Purchase of Goods, Services, and
Public Works Projects'; and
C. Set November 20, 2013, as the date of the second reading and proposed
adoption of Ordinance No. OCSD-XX; and
D. Direct the Clerk of the Board to publish summaries of the Ordinance as
required by law.
CLOSED SESSION:
During the course of conducting the business set forth on this agenda as a regular meeting of the
Board, the Chair may convene the Board in closed session to consider matters of pending real estate
negotiations, pending or potential litigation, or personnel matters, pursuant to Government Code
Sections 54956.8, 54956.9, 54957 or 54957.6, as noted.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or potential litigation;
(c) employment actions or negotiations with employee representatives; or which are exempt from public
disclosure under the California Public Records Act, may be reviewed by the Board during a permitted
closed session and are not available for public inspection. At such time as the Board takes final action
on any of these subjects, the minutes will reflect all required disclosures of information.
Convene in closed session.
(1) CONFERENCE WITH LEGAL COUNSEL RE. EXISTING LITIGATION
(Government Code Section 54956.9(d)(1)
Number of Cases: 2
(A) Mladen Buntich v. Orange County Sanitation District, Riverside County
Superior Court, Case No. RIC 1201005
(B) Santa Ana Watershed Project Authority v. Orange County Sanitation
District, Contractual Arbitration - Jams Reference No. 1210030062
(2) CONFERENCE WITH LEGAL COUNSEL RE. ANTICIPATED LITIGATION —
LITIGATION THAT MAY BE FILED BY THE DISTRICT
(Government Code Section 54956.9(d)(4))
Number of Cases: 2
10/2W13 OCSD Board of Directors Agenda Page 4 of 6
(A) SAW PA Enforcement Action / Cost Recovery Action
(B) Disclosure of Information
(3) PUBLIC EMPLOYEE DISCIPLINE/DISMISSAL/RELEASE
(Government Code Section 54957(b)(1))
Number of Cases: 1
(4) COMPLAINTS OR CHARGES AGAINST PUBLIC EMPLOYEES
(Government Code Section 54957(b)(1))
Number of Cases: 1
(5) CONFERENCE WITH LEGAL COUNSEL RE ANTICIPATED LITIGATION —
SIGNIFICANT EXPOSURE TO LITIGATION
(Government Code Section 54956.9(d)(2))
Number of Potential Cases: 1
Reconvene in regular session.
Consideration of action, if any, on matters considered in closed session.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA
ITEMS, IF ANY:
ADJOURNMENT:
Adjourn the Board meeting until the next Regular Board Meeting on November 20,
2013, at 6:30 p.m.
10/23/13 OCSD Board of Directors Agenda Page 5 of 6
Accommodations for the Disabled: Meeting Rooms are wheelchair accessible. If you require any special disability
related accommodations, please contact the Orange County Sanitation District Clerk of the Board's office at
(714)593-7130 at least 72 hours prior to the scheduled meeting. Requests must specify the nature of the disability
and the type of accommodation requested.
Agenda Postina: In accordance with the requirements of California Government Code Section 54954.2,this agenda
has been posted outside the main gate of the Sanitation District's Administration Building located at 10844 Ellis
Avenue, Fountain Valley, California, not less than 72 hours prior to the meeting date and time above. All public
records relating to each agenda item, including any public records distributed less than 72 hours prior to the meeting
to all,or a majority of the Board of Directors,are available for public inspection in the office of the Clerk of the Board.
NOTICE TO DIRECTORS: To place items on the agenda for the Committee Meeting, items must be submitted to the
Clerk of the Board 14 days before the meeting.
Maria E.Ayala
Clerk of the Board
(714)593-7130
mavalaRocsd.com
For any questions on the agenda,Committee members may contact staff at:
General Manager Jim Herberg (714)593-7300 iherbemOocsd.com
Assistant General Manager Bob Ghirelli (714)593-7400 rghirellitclocsd.com
Director of Engineering Nick Kanetis (714)593-7310 nkanetisfdocsd.com
Director of Facility Support Services Nick Amontes (714)593-7210 narhontes(clocsd.ccm
Director of Finance and Lorenzo Tyner (714)593-7550 Itvneraocsd.com
Administrative Services
Director of Human Resources Jeff Reed (714)593-7144 freed :Zocsd.com
Director of Operations&Maintenance Ed Tortes 714 593-7080 etomes ocsd.com
10/23/13 OCSD Board of Directors Agenda Page 6 of 6
BOARD OF DIRECTORS Neebng Date I Toae.or Dir.
Io/zs/Is
AGENDA REPORT Item Number Item N t umber
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Lorenzo Tyner, Director of Finance and Administrative Services
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION
DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
CONFLICT OF INTEREST NOTIFICATION
Pursuant to Government Code Section 84308, you are required to disclose
any campaign contribution greater than $250 received in the past twelve months from
any party to a contract involving the Orange County Sanitation District. Further, you
may not participate in the decision making process to award a contract to such party.
For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with the District.
In general, you must disclose the basis of the conflict by identifying the name of the firm
or individual who was the contributor.
For the specifics of Government Code Section 84308, please see your Director's
Handbook or call the office of General Counsel.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
See attached listing.
ATTACHMENTS
The following attachment(s) are attached in hard copy and may also be viewed on-line at the OCSD
website(www.ocsd.com) with the complete agenda package:
1. Copies of Claims Paid reports from 9/01/13— 9/15/13 and 9/16/13— 9/30/13
Page 1 of 1
Return to Anemia Report
Claims Paid From 9/1/13 to 9/15/13
Vendor Warrant No. Amount Description
Accounts Payable Warrants
Absolute Standards.Inc. 58922 135.00 Laboratory Services&Supplies
Absolute Standards,Inc. 59079 110.00 Laboratory Services&Supplies
ACCO Engineered Systems Inc. 59080 4,950.00 Repair&Maintenance Services and/or Supplies
AccuStandand U923 847.56 Laboratory Services&Supplies
AccuStandard 59081 377.11 Laboratory Services&Supplies
A-Check America,Inc. 1272 117.75 Human Resources Services
Aerotek 59082 613.35 Professional Serviceed'emporary Services
Agilent Technologies,Inc. U924 1,784.97 Laboratory Services&Supplies
Air Liquids America Corp. 58925 395.34 Laboratory Services&Supplies
Air Liquids America Specialty Gases LLC 59083 186.38 Laboratory Services&Supplies
Air Liquids Industrial U.S.,LP 590M 19,681.46 Laboratory Services&Supplies
Air Products&Chemicals,Inc. U926 14,175.19 Chemicals,WaterWastewater Treatment
Angus Safety,Inc. 1258 7,881.85 Safety,Security,Health Equipment,Supplies,and Services
Airgas Safety,Inc. 1273 4,964.47 Safety,Severity,Health Equipment,Supplies,and Services
Airgas USA,LLC 1259 374.95 Laboratory Services&Supplies
Airgas USA,LLC 1274 5,096.54 Laboratory Services&Supplies
Alhambra Foundry Co.,Ltd. 58927 7,231.68 Repair&Maintenance Services and/or Supplies
Allied Electronics,Inc. 59085 1,748.06 Electrical/Electronic Equipment,Pads&Repairs
Allied Packing&Rubber,Inc. M928 1,435.13 Repair&Maintenance Services and/or Supplies
Allied Packing&Rubber,Inc. 59086 727.31 Repair&Maintenance Services and/or Supplies
Alta-Robbins,Inc. 59088 345]0 ElectricallElecbonic Equipment,Pads&Remains
American Academy of Environmental Engine 59089 50.00 Books and Publications
American Integrated Services,Inc. 59090 1,613.80 Grit&Screenings Disposal
American Machinery&Blade,Inc. U930 296.06 Repair&Maintenance Services and/or Supplies
Amtech Elevator Services 59091 1,035.00 Miscellaneous Services
Analysis,Inc. 58931 4,078.30 Repair&Maintenance Services and/or Supplies
AON Risk Insurance Services West 59061 35,569.94 Insurance(Owner Controlled!Insurance Program)
AppleOne Employment Service 1275 1,199.20 Professional ServicesRemporary,Services
Applied Industrial Technology 58932 892.01 Repair&Maintenance Services and/or Supplies
Applied Industrial Technology 59092 922.69 Repair&Maintenance Services and/or Supplies
Arl Instruments,LLC. 59093 21.28 Electrical/Electenic Equipment,Paris&Repairs
Arms narrational Inc U933 1,029.00 Professional Organioations Meetingrfraining/Membership
Ashbrook Simon Hartley Operations,L.P. Show 1,129.38 Repair&Maintenance Services and/or Supplies
Assoc.Of Environmental Professionals 59095 100.00 Notices&Ads
AT&T M921 234.20 Telecommunications
AT&T Universal Biller 59097 3,194.64 Telecommunications
AT&T 59096 37.00 Telecommunications
Awards&Trophies Company 58934 898.56 Awards and Framing Services
Ayala Engineering M935 13,780.00 Repair&Maintenance Services and/or Supplies
B&K Electric Wholesale 59098 1,939.03 Electrical/Electronic Equipment,Parts&Repairs
Battery Specialties 58936 653.18 Batteries,Various
Beach Cities Scuba Mania M937 300.00 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
BEGBuilding Electronic Controls,Inc 59099 4,014.76 Electrical/Electenic Equipment,Paris&Repairs
Bioexpress Corp U938 223.86 Repair&Maintenance Services and/or Supplies
Black&Veatch Corporation 58915 205,235.99 Professional ServiceslEnginaering Design Services
Black&Veatch Corporation 59063 188,150.46 Professional ServicenEngineenng Design Services
BNI Budding News 59100 2,853.95 Books&Publications
Brea 9Owoer LLC 59101 2,500.00 Miscellaneous Services
EXHIBITA
fncoll Page 1 of 8 WIMO13
Claims Paid From 91 to 9/15/13
Vendor Warrant No. Amount Description
Storming Pacific,Inc. 59102 12,923.65 Chemicals,WasbWastewater Treatment
Bureau Varies North America,Inc. 1260 1,620.00 Industrial Hygiene Services
Bureau Ventas North Amence,Inc. 1276 4,950.00 Industrial Hygiene Services
C.A.Short Company M939 9.20 Safety,Secunty,Health Equipment,Supplies,and Services
California Barricade Remals 59104 1,540.00 Miscellaneous Services
Califomia Dept.of Child Support Saw 2,524.58 Judgments Payable
California Recreation Company 12TT 3,578.13 Boat Slip Rental-Nensm Ocean Monitoring Vessel
California Relocation Services,Inc. 59105 697.50 Miscellaneous Services-Moving/Relocation
California State Association Of 59103 375.00 Professional Organiutions Meeting/Training/Membership
Califomia Water Technologies 590" U,513.68 Chemicals
Cambridge Isotope Labs 58941 780.65 Laboratory Services&Supplies
CAPPO,Inc. 59106 117.00 Professional Organizations Meeting/Traming/Membeiship
Chem Search 58942 390.98 Repair&Maintenance Services and/or Supplies
CHMIA 581 150.00 Training Registration-Calf.Hazardous Materials Investigators Assoc.
Chris A.Stacklin 59213 116.00 Meeting?raining Expense Reimbursement
City of Fountain Valley 59065 58,599.55 Water Use
City of Huntington Beach U978 31.67 Water Use
Clean Energy 59107 31.57 CNG Fueling Station Services/Supplies
Cola-Parmer Instrument Co. 59108 263.85 Laboratory Services&Supplies
Columbia Analytical Services M929 2,400.00 Laboratory Services&Supplies
Columbia Analytical Services 59087 8,730.00 Laboratory Services&Supplies
Connell Chevrolet\GEO 58944 191.91 Autos.Tracks&Marine Equipment,Peru,Accessories&Services
Connell Chevrolet\GEO 59109 TT4.04 Autos,Tracks&Marne Equipment,Parts,Accessories&Services
Constellation Nessmergy Gas Division LLC 59066 28,766.94 Natural Gas
Consumers Pipe&Supply Co. 1261 34.96 Repair&Maintenance Services and/or Supplies
Consumers Pipe&Supply Co. 1278 2,260.93 Repair is Maintenance Services and/or Supplies
Controlled Motion Solutions 58945 606.20 Repair&Maintenance Services and/or Supplies
Converse Consultants 58946 4,586.00 Professional Services/Materials&Geotechnical Testing
Corner Bakery Car€(CBC) 58947 450.00 Catering Services
Corporate Image Maintenance,Inc. 59067 36,570.00 Janitor&Household Service&Supplies
Cotton Point Design,Inc.dba Power Desi 59110 1,838.70 Electrical/Electronic Equipment,Pads&Repairs
County of Orange-Health Care Agency 59111 627.00 Governmental Agency Fees&Charges
County Wholesale Electric Co. 59112 421.06 Electrical/Electronic Equipment,Pads&Repairs
Court Order 58990 2,179.38 Judgments Payable
Court Order 59021 108.00 Judgments Payable
Court Order 59058 912.50 Judgments Payable
CS-AMSCO 59113 2,623.66 Repair&Maintenance Services and/or Supplies
CWEA Membership 58MB 444.00 Professional Organizations Maetinglhaining/Membership
Dale M.Fiola,Attorney At Law 59215 45,000.00 Human Resource Services/Claimaint
Designer Stitch Embroidery 59114 1,857.78 Public Outreach Supplies
Detection Instruments Corporation 58949 3,239.38 Electrical/Electronic Equipment,Pads&Repairs
Donald A.HavMome 59210 939.46 Meeting/training Expense Reimbursement
Dudek&Associates,Inc. 59068 53,246.58 Professional ServicesrEngineenng Design Services
Duno-Edvrmds Corporation M950 328.35 Facilities,Maintenance,Services It Supplies
Easy Vac 59115 117.58 Repair&Maintenance Services and Supplies
Embark Consulting,LLC 58951 3,271.61 Professional ServicesSCADA Subsea Maintenance Suplwd
Employee Benefits Specialists,Inc. M952 10,960.73 Reimbursed Prepaid Employee Medical&Dependent Care
Employee Benefits Specialists,Inc. 59116 3,149.25 Reimbursed!Prepaid Employee Medical&Dependent Care
Enchanter,Inc. 59117 760.00 Vessel Services-Monitoring Vessel Nemesis
EXHIBITA
fnrzWmm Page 2 of 8 WIMO13
Return to Amends Report
Claims Paid From 9/1/13 to 9/15/13
Vendor Warrant No. Amount Description
ENS Resources,Inc. 58953 5,500.00 Professional Services-Federal Advocacy
Environmental Engineering&Contracting 59118 2,000.00 Professional Services/Specialty Course Audits
Environmental Express,Inc. 59119 3,336.21 Laboratory Services&Supplies
Environmental Resource Associates 58954 981.46 Laboratory Services&Supplies
Environmental Resource Associates 59120 172.70 Laboratory Services&Supplies
Envirosupply&Service,Inc 59121 9,000.00 Laboratory Services&Supplies
ESSCO(Engineering Sales Service) 59122 909.48 Repair&Maintenance Services and/or Supplies
Ewing litigation M955 100.03 Irrigation Repair&Maintenance Services and/or Supplies
Ewing rogation 59124 93.31 Irrigation Repair&Maintenance Services and/or Supplies
Fedex Corporation 59125 26.51 Freight Services
Fisher Scientific M956 1,683.59 Laboratory Services&Supplies
Five Star Metals,Inc. M957 875.00 Miscellaneous Parts and Supplies
Flex Core U968 436.84 Repair&Maintenance Services and/or Supplies
Rooms Products,Inc. 58959 516.97 Electrical/Elechonic Equipment,Pads is Repairs
Fluke Electronics Corp.-Remit to: 58960 1,187.00 Electrical Pads&Supplies
FOPCO Incorporated M961 2,750.00 Repair&Maintenance Services and/or Supplies
Franchise Tax Board U962 150.00 Judgments Payable
Franchise Tax Board 59127 2,750.29 Judgments Payable
Franklin Covey M963 68.13 Once Supplies
Fuller Truck Accessories M965 1,287.99 Autos,Trucks&Marine Equipment,Pads,Accessories&Services
Funnanite America,Inc. U966 9,729.00 Repair&Maintenance Services and/or Supplies
Ganahl Lumber Company 58967 365.83 Facilities,Maintenance,Services&Supplies
Ganahl Lumber Company 59128 105.69 Facilities,Maintenance,Services&Supplies
George L.Robertson 59212 663.24 Meeting/Training Expense Reimbursement
Giedich-Mitchell,Inc. U968 2,153.52 Repair&Maintenance Services and/or Supplies
Global Environmental Network Inc. 59129 3,020.00 Safety,Security,Health Equipment,Supplies,and Services
GMU Gestechnical,Inc. 59130 3,940.64 Professional Services/General Counsel-Buterpoint Rehab
Golden State Water Company M969 129.80 Water Use
Golden West Machine,Inc. U970 4,500.00 Repair&Maintenance Services and/or Supplies
Golden West Window Service 58971 4,783.00 Facilities,Maintenance,Services&Supplies
Government Finance Officers Association M972 55.00 Professional Organizations MeetingRraining/Membership
Govplace 59131 7,016.00 Computer Applications and Services
Grainger,Inc. U973 6,023.18 Repair&Maintenance Services and/or Supplies
Grainger,Inc. 59132 1,599.93 Repair is Maintenance Services and/or Supplies
H&E Equipment Services 59133 408.68 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
H.H.Fremer Architects,Inc. 59069 29,924.00 Construction
Hach Company M974 3,359.45 Laboratory Services&Supplies
Harrington Industrial Plastics,Inc. M975 4,318.74 Repair is Maintenance Services and/or Supplies
Hartzell Fan Inc. M976 1,653.04 Electrical/Electronic Equipment,Pads&Repairs
Hemel Dhodia 59207 188.00 Professional Organizations MeetinglTraming/Membership
Hill Brothers 12M 181 Chemicals,Water/Wastewater Treatment
Hills Boat Service,Inc. 59134 1,046.96 Autos.Trucks&Marine Equipment,Parts,Accessories&Services
Home Depot M971 98.19 Miscellaneous Pads and Supplies
Home Depot 59135 139.85 Miscellaneous Pads and Supplies
Hub Auto Supply 59136 757.62 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
IDE Distribution,Inc. 58979 2,068.62 Laboratory Services&Supplies
IDS Group 59137 2,035.00 Professional Services/Engineering Design Services
Imperial Flange&Fitting Co.,Inc. M980 636.40 Mechanical Pads&Supplies
Indiana Child Support Bureau U981 290.00 Judgments Payable
EXHIBITA
fnrzlWmm Page 3 of 8 WIMO13
Claims Paid From 9/1/13 to 9/15/13
Vendor Warrant No. Amount Description
Industrial Distribution Group 58982 3,254.53 Repair&Maintenance Services and/or Supplies
Industrial Distribution Group 59138 384.52 Repair&Maintenance Services and/or Supplies
Industrial Fabrics Corp. 59139 11486.25 Repair&Maintenance Services and/or Supplies
Inorganic Ventures,Inc. M983 120.27 Laboratory Services It Supplies
Insight Public Sector,Inc. 59140 17,328.32 Computers,Sofhrare/Had1vare
Insite Instrument Group,Inc. 589M 3,424.00 Electrical/Electronic Equipment,Pads&Repairs
Interstate Batteries of Cal Coast 59141 1,840.65 Repair&Maintenance Services and/or Supplies
Intl.Union of Oper.Eng.AFL CIO Local M985 4,677.23 Dues Deductions
Intratek Computer,Inc. U986 913.84 Netuork/Seryer/Printer Maintenance Services
Inyensys Systems,Inc. 1279 1,698.55 Electrical/Electronic Equipment,Parts&Repairs
Ironman Pads&Services 59142 164.59 Repair&Maintenance Services and/or Supplies
Irvine Ranch Water District M987 229.62 Water Use
ISA Publications U988 725.00 Subscription
James D.Ruth 59214 10,000.00 Professional Services/Gonsullanl
James E.Colston 59206 101.00 Meeting/Tmining Expense Reimbursement
Jamison Engineering Contractors,Inc. 59144 10,445.00 Professional Services/Construction Support Services
JAMS/Endispute 59216 107,864.29 Legal Service-United Technologies
Jays Catering 59145 668.25 Catering Services
Jensen Instrument Co. 59146 2,02.60 Electrical/Electronic Equipment,Pads&Repairs
JIG Tucker And Son,Inc. 59143 1,744.20 Safety,Secunty,Health Equipment,Supplies,and Services
Johnstone Supply U989 1,430.84 Repair&Maintenance Services and/or Supplies
Johnstone Supply 59147 142.56 Repair is Maintenance Services and/or Supplies
Kanawha Insurance Company 59148 2,442.91 Voluntary Benefits-SSTD Insurance
Kemim Water Solutions 1271 47,515.78 Chemicals,WaterWastewater Treatment
L.Johnson Painting 59149 2,934.00 Facilities,Maintenance,Services&Supplies
LECO Corporation 58991 3,822.59 Laboratory Services&Supplies
Lisa A.Rothbad 59059 1,120.18 Meeting/Training Expense Reimbursement
Luccfs Gourmet Foods,Inc. M992 213.80 Capping Services
Mag Tel,Inc. U993 88.26 Electrical Parts&Supplies
Magnus Pacific Corporation 59076 1,227,466.50 Construction
Malcolm Firms Inc. 59062 39,216.71 Construction
Mani Motors 59150 75.00 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Matt Chlor,Inc. 58994 7,802.68 Repair&Maintenance Services and/or Supplies
McMaster-Carr Supply Co. 1262 493.10 Repair is Maintenance Services and/or Supplies
McMaster-Carr Supply Co. 1280 1,356.86 Repair&Maintenance Services and/or Supplies
MCR Technologies,Inc. M995 10,207.46 Repair&Maintenance Services and/or Supplies
Measurement Control Systems,Inc. 59161 1,532.19 Repair&Maintenance Services and Supplies
Michele Farmer 59209 110.24 Meeling/rmining Expense Reimbursement
Midway Mfg.&Machining Go. 59152 1,598.40 Repair&Maintenance Services and/or Supplies
Mid-Went Associates,Inc. 59153 15,692.13 Repair&Maintenance Services and/or Supplies
Mike Bubalo Construction Co.,Inc. U920 40 .739.79 Construction
Mine Safely Appliance 1263 3,780.79 Electrical/Electronic Equipment,Pads&Repairs
Mine Safety Appliance 1281 3,607.33 Electrical/Electronic Equipment,Pads&Repairs
Mitchell Instrument Co. M996 1,786.01 Tests&Supplies
Morrow Meadows Corp. 59077 S6,o63.]5 Construction
Motion Industries,Inc. 59154 72.87 Electrical/Electronic Equipment,Pads is Repairs
MSA c/o Geoff Cobbefl M997 50.00 Professional Organizations MeetinglTraining/Membership
MTM Recognition Corporation M998 102.96 Service Awards
MTM Recognition Corporation 59155 422.22 Service Awards
EXHIBITA
fnielri Page 4 of 8 WIMO13
Return to Anemia Report
Claims Paid From 9/1/13 to 9/15/13
Vendor Warrant No. Amount Description
MWH Americas,Inc. 59070 32,195.90 Professional Services/Engineering Design Services
Myers&Sons Hi-Way Safety,Inc. 58999 216.91 Repair&Maintenance Services andlor Supplies
NACE lotsmational 59156 1,830.00 Professional Organizations Meelingffroming/Membership
National Water Research Institute 59071 50,000.00 Professional Organizations Meeting/TraminglMembership
NRG Engine Services,L.L.C. 59000 2,156.58 Repair&Maintenance Services ambor Supplies
NRG Engine Services,L.L.C. 59157 700.95 Repair&Maintenance Services and/or Supplies
OCEA 59001 702.00 Dues Deductible
Office Depot 59002 1,386.11 Office Supplies
Office Depot 59168 681.41 Office Supplies
Office Team 59003 3,806.25 Professional Services/temporary Services
Olin Corporation 59159 13,561.07 Chemicals,WaterlWastawater Treatment
OneSoume Distributors,Inc. 59004 2,349.17 Electrical/Electronic Equipment,Paris&Repairs
OneSource Distributors,Inc. 59160 7,809.22 Electrical/Electronic Equipment,Parts&Repairs
Operation Technology.Inc. 59123 2,149.00 Soflware Meint.
Orange County Auto Parts 59161 289.80 Tuck Supplies
Orange County Council of Governments 59005 7,500.00 Professional Organizations MeetinglTraminglMembership
Orange County Sheriff 59006 600.08 Judgments Payable
Orange County United Way 59007 40.00 Employee Contributions
Orange County Vector Control District 59008 145.38 Past Control
Orange County Vector Control District 59162 160.86 Pest Control
Orange County Water District M916 44,650.25 GAP Water
Orange Courser 59009 77.11 Delivery Services
OSTS Inc. 59163 650.00 Professional Organizations MeetingRraining/Membership
Packer Supply Company 1264 177.55 Miscellaneous Paris and Supplies
PaMhouse Tire,Inc. 59010 261.75 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Parkhouse Tire,Inc. 59164 2,493.09 Autos.Trucks&Marine Equipment,Parts,Accessories&Services
Parkson Corporeton 59165 5,292.00 Mechanical Pads&Supplies
Patriot Video Productions 59166 738.09 Miscellaneous Services
PBS&J M914 57.158.54 Professional Servicoolingineer ng Design Services
PCS Express,Inc. 59167 157.88 Courier Services
Peace Officers Council of CA 59011 2,042.87 Dues Deductions,Supervisors&Professionals
Peak Scientific Inc 59168 2,000.00 Laboratory Services&Supplies
Peerless Wiping Materials Co. 59012 794.02 Janitor&Household Service&Supplies
Pencco,Inc. 59072 25,749.63 Chemicals
Performance Pipeline Technologies 59073 26,927.42 Professional Services/CCTV InspectionlSewedine Cleaning
PL Hawn Company,Inc. 59013 808.36 Repair&Maintenance Services and/or Supplies
PL Hawn Company,Inc. 59169 745.20 Repair&Maintenance Services and/or Supplies
Plash Fab Inc 59014 8,856.00 Repair&Maintenance Services and/or Supplies
Plumbers Depot,Inc. 59015 2,884.90 Repair&Maintenance Services and/or Supplies
Polydyne,Inc. 1257 71,370.71 Chemicals,WatenWasiewater Treatment
Power Bros.Machine,Inc. 59170 2,415.50 Repair&Maintenance Services and/or Supplies
PR Electronics,Inc. 59016 2,159.46 Electrical/Electronic Equipment,Pads&Repairs
Prexair Distribution,Inc. 59171 341.84 Laboratory Services&Supplies
Primrose ice Co.,Inc. 59172 131.25 Water&Ice Services
Propipe Professional Pipe Services 1287 2,080.00 Professional SewicooCCTV Sersa ine Inspections
Pmdential Overall Supply 1265 2,986.92 Un'dorms
Prodential Overall Supply 1282 3,019.71 Uniforms
Pryor SeminapeCanser Track 58964 139.00 Professional Organizations MeetinglTraming/Membership
Psomas 59017 4,531.72 Professional Services-Geographic Information System
EXHIBITA
nnrztwmm Page 5 of 8 WIMO13
Claims Paid From 9/1/13 to 9/15/13
Vendor Warrant No. Amount Description
Pyramid Fence Company,Inc. 59173 3,560.00 Facilities,Maintenance,Services&Supplies
Q Air-Calif.Div.Pump Engineering 59018 6,243.48 Repair&Maintenance Services and Supplies
Quayle Consulting Inc. 59174 5,288.69 Computer Applications&Services
Quinn Company 59019 89.10 Repair&Maintenance Services and/or Supplies
Quinn Pourer Systems 59020 358.20 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Rabobank,Escrow Acct4272295573 59205 12,917.95 Construction
Radwall International Inc. 59175 4,600.00 Repair&Maintenance Services and/or Supplies
Rainbow Disposal Co. 59176 3,499.00 Waste Disposal
Randstad Technologies,L.P. 59177 280.00 Computer Applications&Services
RBF Consulting 59022 429.96 Professional Services/Enginaering Design Services
Regents of the University of Calif. 59023 266.00 Meeting/Training Registration
Rende Consulting Group,Inc. 59178 2,850.00 Professional Serdces/Engineenng Services Wintersburg Channel
Restek Corp. 12H 427.05 Laboratory Services&Supplies
pastel,Corp. 1283 406.85 Laboratory Services&Supplies
Richard A.Stoneman Tr 59190 2,431.31 Connection Fees CFCC
RMS Engineering&Design,Inc. 59024 560.00 Professional Services/Engineenng Design Services
Rotork Controls,Inc. 59025 3,819.22 Electncal/Electionic Equipment,Parts&Repairs
Rotork Controls,Inc. 59179 4,911.47 Electiicel/Electronic Equipment,Pads&Repairs
Royal Wholesale Electric 59026 623.27 Repair&Maintenance Services and/or Supplies
Royale Cleaners 59180 205.50 Miscellaneous Services
RS Hughes Co.,Inc. 59027 104]1 Repair&Maintenance Services and/or Supplies
$0.1ke FUIfiIIment Inc 59181 175.29 Autos.Trucks&Marine Equipment,Parts,Accessories&Services
San Diego/Orange Fluid System Technologi 59028 1,543.80 Repair&Maintenance Services and/or Supplies
San Diegc/Orange Fluid System Technologi 59182 110.93 Repair&Maintenance Services and/or Supplies
SC Fuels 59029 282.36 Fuel and Lubricants
SCP Science 59030 576.00 Laboratory Services&Supplies
SCPLRC(Southern California Public Reis. 59031 200.00 Professional Organizations MeetingRraining/Membership
Shamrock Supply Co.,Inc. 59032 760.60 Repair&Maintenance Services and/or Supplies
Shureluck Sales&Engineering 59033 482.51 Repair&Maintenance Services and/or Supplies
Siemens c/o Jensen Instrument Co. 59183 1,994.00 Electiicel/Electronic Equipment,Pads is Repels
SkillPath 59164 134.00 Training
SkillPath Seminars 590M 134.00 Professional Organization&MeetinglTraining Registration
Snap On Industrial 59035 202.95 Tools
Snap-On Equipment 59185 2,802.81 Repair&Maintenance Services and/or Supplies
So.Cal Gas Company 59186 250.04 Utilities
Southern California Edison M917 120,028.44 Utilities
Southern California Edison 59187 2,516.84 Utilities
Southland Water Technologies,L.L.C. 59036 1,720.64 Repair&Maintenance Services and/or Supplies
Sperling Instruments,Inc. 59037 555.03 Electrical/Electronic Equipment,Pans&Repairs
Spectraquest,Inc. 59188 2,121.00 Electrical/Electronic Equipment,Paris&Repairs
Standard Automation and Control 59189 2,785.00 Computer Applications&Services
Staples 59038 542.27 Office Supplies
Summit Steel 12M 112.45 Repair&Maintenance Services and/or Supplies
Sunset Industrial Parts 59039 20.91 Repair&Maintenance Services and/or Supplies
TC Safety Supply,Inc. 59191 3,954.31 Safety,Security,Health Equipment,Supplies,and Services
Tektronix Inc 59192 195.00 Instrument Repairs&Calibration Services
TedAmence Ontano 1267 5,817.00 Laboratory Services&Supplies
TestAmerica Ontano 1285 384.00 Laboratory Services&Supplies
Thatcher Company Of California 59040 5,879.06 Chemicals,WatenWastewater Treatment
EXHIBITA
fnrzlWmm Page 6 of 8 WIMO13
Return to Amends Report
Claims Paid From 9/l/13 to 9/15/13
Vendor Warrant No. Amount Description
The Fire%-Tinguisher Service Co. 59126 158.00 Safety,Security,Health Equipment,Supplies,and Services
Thompson Industrial Supply,Inc. 1268 870.57 Repair&Maintenance Services and/or Supplies
Time Warner Communications 59NI 61.72 Telecommunications
Tom B.Meregillano 59211 1,306.75 Meeting/Training Expense Reimbursement
Total Resource Management,Inc. 59042 5,500.00 Professional Services/Implementation of IBM Maxim
Trans U.S.Inc 59043 153.08 Repair&Maintenance Services and/or Supplies
Tanscat 1269 5,173.61 Repair&Maintenance Services and/or Supplies
Tadter PEE Inc M918 38,766.44 Repair&Maintenance Services and/or Supplies
Tropical Plaza Nursery,Inc. 59044 12.877.50 Landscape Maintenance Services
Tropical Plena Nursery,Inc. 59194 260.00 Landscape Maintenance Services
Troy D.Edgar 59208 131.43 Meeting/Training Expense Reimbursement
Tole Ranct✓Magan Farms 59074 2%,277.59 Biosohds Management
TW Telecom Holdings,Inc. 59195 9,333.16 Telecommunications
United Percel Service 59045 180.13 Freight Services
United Parcel Service 59196 120.65 Freight Services
United States Department Of The Treasury 59046 399.86 Judgments Payable
Unity Scientific 59197 4,995.00 Laboratory Services&Supplies
Universal Flooring Systems,Inc. 59198 1,075.00 Facilities,Maintenance,Services&Supplies
US Equipment Co.,Inc. 59047 989.09 Repair&Maintenance Services and/or Supplies
US Peroxide,L.L.C. 59199 20,711.86 Chemicals,WatenWasteerater Treatment
USA Bluebook 59NB 695.28 Laboratory Services&Supplies
Velin Corporation 1270 2,116.43 Repair&Maintenance Services and/or Supplies
Valid Cooperation 12M 446.69 Repair&Maintenance Services and/or Supplies
Valve Automation&Controls 59200 4,634.22 Repair&Maintenance Services and/or Supplies
Venzon California 59049 644.21 Telecommunications
Veriwn Wireless 59050 1,234.11 Telecommunications
Vanoon Wireless 59201 47.11 Telecommunications
Veme's Plumbing 59051 W6.95 Plumbing Services&Supplies
Veme's Plumbing 59202 2,632.24 Plumbing Services&Supplies
Voyager Fleet Systems,Inc. 59075 29,374.78 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
MR Scientific Products 59052 340.07 Laboratory Services&Supplies
W.M.Lyles Co. 59078 245,441.05 Construction
Water Environment Federation 59063 602.00 Professional Organiutions Meeting/Training/Membership
Winds Sanitary Supply 59054 681.51 Janitor&Household Service&Supplies
Wendy T.Sevenand, 59060 164.00 Meeting/Training Expense Reimbursement
West Coast Arbonsts,Inc. 59203 1,375.00 Landscape Maintenance Services
West Lite Supply Company,Inc. 59065 82.24 Electfical/Electronic Equipment,Pads&Repairs
West Los Supply Company,Inc. 592N 24.81 EleciricaMlectronic Equipment,Pads&Repairs
Winter Corporation 59056 761.17 Repair&Maintenance Services and/or Supplies
Woodruff Spadlin&Smart M919 157,931.38 Professional Services-Legal
%pedx,An International Paper Company 59067 1,634.18 Miscellaneous Supplies
Total Accounts Payable-Warrants $ 4.677.996.22
Payroll Disbursements
Employee Paychecks 51730 - 51767 $ 80,978.43 Bivreekly Payroll(WW13)
Employee Paychecks 51768 - 51769 746.49 Interim Payroll-IDEA Checks(9/03/13)
Direct Deposit Statements U2586-U3140 1,414,265.48 Bivreekly Payroll(9/04/13)
Total Payroll Disbursements $ 1,495,990.40
EXHIBITA
fnrzoWmm Page 7 of 8 Wi&Ra13
Claims Paid From 9/1/13 to 9/15/13
Vendor Warrant No. Amount Description
Wire Transfer Payments
OCSD Payroll Taxes 8 Contributions $ 801,627.80 Biseekly Payroll(9/04/13)
Total Wire Transfer Payments $ 801,627.80
Total Claims Paid 9101113-9116113 $ 6,975,614.42
UHIBITA
n�rzioimm Page 8 of 8 WIMO13
Return to America Report
Claims Paid From 9/16/13 to 9/30113
Vendor Warrant No. Amount Description
Accounts Payable Warrants
A&J Sheet Metal,Inc. 59393 $ 1,685.45 Repair&Maintenance Services and/or Supplies
Abel Scale,Inc. 59228 870.00 Repair&Maintenance Services and/or Supplies
Absolute Standards,Inc. 59395 3,700.00 Laboratory Services&Supplies
AccuStandaM 59396 3,485.36 Laboratory Services&Supplies
A-Check America,Inc. 1289 217.50 Human Resources Services
Adam P.Newsom 59372 1,265.15 Meeting/Tmining Expense Reimbursement
Advanced Cooling Technologies 59397 574.00 Repair&Maintenance Services and/or Supplies
AECOM Technical Services,Inc. 59229 13,946.13 Professional Services/Engineering Design Services
Aerotek 59230 867.46 Professional ServicesRemporary Services
Aerotek 59398 903.15 Professional Service Vremporary Services
Agilent Technologies,Inc. 59231 2,659.50 Laboratory Services&Supplies
Ago lndustdmDBA So-Cal Sweeping 59342 980.00 Street Sweeping Services
Air Liquids lndusmal U.S.LP 59232 10,299.44 Laboratory Services&Supplies
Air Liquids Industrial U.S.,LP 59399 11,"5.05 Laboratory Services&Supplies
Airgas Safety,Inc. 12M 2,T13.44 Safety,Security,Health Equipment,Supplies,and Services
Airgas Safety,Inc. 13M 9,042.13 Safety,Security,Health Equipment,Supplies,and Services
Airgas USA,LLC 1291 707.80 Laboratory Services&Supplies
Airgas USA,LLC 1310 1,330.79 Laboratory Services&Supplies
Alhambra Foundry Co.,Ltd. 59401 19,083.60 Repair&Maintenance Services and/or Supplies
Ahmed Inc. 59233 131.95 Laboratory Services&Supplies
All American Savior Tools 59402 2,731.67 Repair is Maintenance Services and/or Supplies
Allied Packing&Rubber,Inc. 592M 168.76 Repair&Maintenance Services and/or Supplies
Amazing Tents&Events 59235 1,937.00 Event Supplies
American Concrete Institute 59236 76.50 Books and Publications
American Express WL Related Svcs Co.,1 59237 5,089.92 Purchasing Card Program for Miscellaneous Travel Expenses
American Integrated Services,Inc. 59217 1 ,623.95 Grit&Screenings Disposal
American Payroll Association 59403 990.00 Professional Organiution&Meeting/Traming Registration
Analysis,Inc. 59238 1,365.90 Repair&Maintenance Services and/or Supplies
Ann H.Brendvoid 59518 347.32 Meeting/rrmning Expense Reimbursement
AppleOne Employment Service 1292 1,199.20 Professional Services/Temporary Services
Applied Industrial Technology 59239 663.24 Repair&Maintenance Services and/or Supplies
Aquatic Biosystems,Inc. 59404 247.50 Laboratory Services&Supplies
AIRS Enterprises,Inc. 59405 400.00 Laboratory Services&Supplies
ASCE 59406 1,120.00 Professional Organizations MeetingRraining/Membership
Ashbrook Simon Hartley Operations 59400 3,982.89 Repair&Maintenance Services and/or Supplies
AT&T 59394 237.37 Telecommunications
AT&T Mobility 11,LLC. 59407 199.99 Telecommunications
AT&T Universal Biller 59240 153.72 Telecommunications
AT&T 59241 37.00 Telecommunications
AT&T Teleconference Services 59408 68.77 Telecommunications
ATCC:Amer.Type Culture Collect 59409 249.00 Laboratory Services&Supplies
Atkins North America 59411 13,%4.97 Professional Services/Engineering Design Services
Awards&Trophies Company 59242 229.40 Awards and Framing Services
Awards&Trophies Company 59412 63.73 Awards and Framing Services
AWSI 59243 138.00 Professional Services-DOT Program Administration
B&K Electric Wholesale 59244 573.26 Electrical/Electronic Equipment,Paris&Repairs
Battery Specialties 59245 842.40 Batteries,Various
Battery Systems,Inc. 59413 262.74 Repair&Maintenance Services and/or Supplies
EXHIBITA
fnrztwmm Page 1 of 8 IWMO13
Claims Paid From 9/16/13 to 9/30113
Vendor Warrant No. Amount Description
BC Wire Rope&Rigging 59414 3,547.45 Tools&Supplies
BEC-Building Electronic Controls,Inc 59246 5,626.22 Electrical/Electronic Equipment,Parts&Repairs
BHI Management Consulting 59247 1,S00.00 Professional Servicae/S4ategic Planning
Black&Veatch Corporation 59218 46,901.01 Professional Services/Engineenng Design Services
Black&Veatch Corporation 59379 34,557.90 Professional Services/Engineering Design Services
Blair-Martin Co.,Inc. 59415 4,250.00 Repair&Maintenance Services and/or Supplies
B"Group 59248 5,750.00 Professional Financial Services
Brea 9Owner LLC 59416 2,500.00 Miscellaneous Services
Brown&Caldwell 59219 242.202.78 Professional Services/Engineering Design Services
Bug Central 59249 295.00 Pest Control Services
Bureau Ventas North America,Inc. 1293 6,473.05 Industrial Hygiene Services
Bush&Associates,Inc. 59250 5,598.00 Professional Services/Surveying Services
C.A.Short Company 59261 81.75 Safety,Security,Health Equipment,Supplies,and Services
California Bank&Trust#201037519 59517 1,333.47 Construction
California Dept.of Child Support 59252 2,524.58 Judgments Payable
California Relocation Services,Inc. 59417 67.50 Miscellaneous Services-Moving/Relocation
CALPELRA 59263 149.00 Professional Organizations Meeting/Training/Membership
CALPELRA 59418 985.00 Professional Organizations Meetinglhaining/Membership
Cal-Therm Inc. 59254 1,420.00 Repair&Maintenance Services and/or Supplies
Caltrol,Inc. 59419 2,907.10 Electrical/Electronic Equipment,Parts&Repairs
CAPPO,Inc 59420 78.00 Professional Organizations Meeting/Training/Membership
COP Industries. 59255 5,260.50 Janitor&Household Service&Supplies
CDN Isotopes 59256 3,295.00 Laboratory Services&Supplies
Carmek Environmental,Inc. 59421 4,291.67 CEMS Maintenance Agreement
Chem Search 59422 710.99 Repair&Maintenance Services and/or Supplies
Chuck M.Forman 59371 1,424.30 Meeting/rmining Expense Reimbursement
City of Fountain Valley 59380 145,P1.89 Permits
City of Huntington Beach 59283 11.82 Water Use
City of Santa Ana 59267 179.56 Coopem8ve Projects Reimbursement Program
City of Seal Beach 59337 207.96 Water Use
City of Westminster 59258 25.80 Water Use
Clean Harbors Environmental Services 12N 8,792.05 Grit&Screenings;Hazard Waste Disposal
Coastal Ignition and Controls,Inc. 59269 3,041.84 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Coastal Ignition and Controls,Inc. 59423 1,620.00 Autos.Trucks&Marine Equipment,Pars,Accessories&Services
Columbia Analytical Services 59378 25,091.54 Laboratory Services&Supplies
Commuter Van Conversion,Inc. 59424 135.00 Repair&Maintenance Services-Installation of ABTS Seat Belt Modules
Connell Chevrolet\GEO 59260 245.51 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Connell Chevrolet\GEO 59425 334.74 Autos.Trucks&Madne Equipment,Pars,Accessories&Services
Consolidated Electrical Distributors 59426 3,06.13 Electrical/Electronic Equipment,Parts&Repairs
Consumers Pipe&Supply Co. 1295 1,089.35 Repair&Maintenance Services and/or Supplies
Consumers Pipe&Supply Co. 1311 679.02 Repair&Maintenance Services and/or Supplies
Corner Bakery Onto(CBC) 59261 99.73 Catering Services
CORRPRO Companies,Inc. 59381 31,966.50 Professional Service Vfemporary Services
County of Orange Auditor Controller 59262 218.50 Governmental Agency Fees&Charges
County of Orange Auditor Controller 59428 3,140.00 Governmental Agency Fees&Charges
County of Orange Auditor Controller 59429 793.00 Governmental Agency Fees&Charges
County of Orange Auditor Controller 59430 660.00 Governmental Agency Fees&Charges
County Wholesale Electric Co. 59431 1,300.32 Electrical/Electronic Equipment,Parts&Repairs
Court Order 59295 2,179.38 Judgments Payable
EXHIBITA
nnrzrwmm Page 2 of 8 1WMO13
Return to Adorns Report
Claims Paid From 9/16/13 to 9/30113
Vendor Warrant No. Amount Description
Court Order 59329 108.00 Judgments Payable
Court Order 59367 912.50 Judgments Payable
CR&R,Inc. 59263 1,720.45 Waste Disposal
CS-AMSCO 592M 901.96 Repair&Maintenance Services and/or Supplies
Culligan of Orange County 59432 58.55 Repair&Maintenance Services and/or Supplies
CWEA Membership 59265 536.00 Professional Organizations Meetinglhaining/Membership
CWEA Membership 59433 148.00 Professional Organizations MeetingRraining/Membership
Dale Carnegie Training Of Orange County 594M 398.00 Professional Organizations Meeting/Traming/Membeiship
David Cutoff 59266 225.00 Laboratory Services&Supplies
Deaver Manufacturing Co. 59435 223.60 Autos.Trucks&Marine Equipment,Pads,Accessories&Services
Detection Instruments Corporation 59267 3,112.85 ElectricMUElectronic Equipment,Pads&Repaire
Emagined Security Inc. 59436 20,483.95 Professional Services/Secunty Software Program Consulting
Employee Benefits Specialists,Inc. 59220 833,041.07 Reimbursed Prepaid Employee Medical&Dependent Care
Employee Benefits Specialists,Inc. 59269 10,864.58 Reimbursed Prepaid Employee Medical&Dependent Care
Employee Benefits Specialists,Inc. 59437 2,349.75 Reimbursed Prepaid Employee Medical&Dependent Care
Employment Development Department 59438 14,407.00 Unemployment Insurance
EMSL Analytical,Inc. 59439 3,393.00 Safety,Security,Health Equipment,Supplies,and Services
Enchamer,Inc. 59270 800.00 Vessel Services-Monitoring Vessel Nedssa
ENS Resources,Inc. 59440 5,500.00 Professional Services-Federal Advocacy
Environ Strategy Consultants,Inc. 59441 3,350.00 Professional Services-Quarterly Sampling of Groundwater Monitoring Wells in the Auto
Environmental Engineering&Contracting 59442 7,820.00 Professional Services/Specialty Course Audits
Environmental Resource Associates 59271 987.46 Laboratory Services&Supplies
Ewing Irrigation 59272 30.03 Irtigation Repair&Maintenance Services and/or Supplies
Ewing Irrigation 59443 381.41 Irrigation Repair&Maintenance Services and/or Supplies
Express Lens Lab 12M 1,934.00 Safety,Security,Health Equipment,Supplies,and Services
Facility Process Solutions ConsuBing 59273 3,712.20 Professional Services/Biohickling Filter Inspection Services
Feviola Miranda 59523 251.58 Meeting/Training Expense Reimbursement
Feces Corporation 59444 130.10 Freight Services
First American Comiagic 59427 138.00 Software Maintenance Agreement
Fisher Scientific 59274 2,919.24 Laboratory Services&Supplies
Fishing Boats Unlimited 59275 451.44 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Fountain Valley AAA Auto Spa 59276 1,175.10 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Fountain Valley Body Works 2 59268 320.28 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Franchise To.Board 59277 150.00 Judgments Payable
Franklin Covey 59445 17.24 Office Supplies
Fresno First Bank-Acm 100013307 59369 3,166.25 Construction,Retention
Fresno First Bank-Acm 100013315 59388 50,116.15 Construction,Retention
G&B Creative Solutions LLC 591 4,845.96 Printing and Publications
Ganahl Lumber Company 59278 3,888.03 Facilities,Maintenance,Services&Supplies
George Rivera 59374 252.57 Meeting/Training Expense Reimbursement
Global Environmental Netvnrk Inc. 59447 1,650.00 Safety,Security,Health Equipment,Supplies,and Services
Golden West Window Service 59279 432.00 Facilities,Maintenance,Services&Supplies
Government Finance Officere Association 591 625.00 Professional Organizations Meeling/Training/Membemhip
Grainger,Inc. 59280 303.66 Repair&Maintenance Services and/or Supplies
Guarantee Records Management 59281 1,153.02 Professional Services-Document Storage&Shredding
HDR Engineering,Inc. 59221 118,521.69 Professional Services/Enginaerng Design Services
Hill Brothers 13M 1G3,392.99 Chemicals,Water/Wastewater Treatment
Home Depot 59282 44.65 Miscellaneous Parts and Supplies
Hyatt Legal Plans 592M 1,748.00 Professional Services-Legal
EXHIBITA
fn6lWmm Page 3 of 8 IWMO13
Claims Paid From 9/16/13 to 9/30113
Vendor Warrant No. Amount Description
IHS Global Inc 59449 90.00 Books and Publications
Indiana Child Support Bureau 59285 291 Judgments Payable
Industrial Distribution Group 59286 77.25 Repair&Maintenance Services and/or Supplies
Industrial Distribution Group 59450 98.29 Repair&Maintenance Services and/or Supplies
Industrial Electric Machinery LLC 59287 2,883.72 Repair&Maintenance Services and/or Supplies
Insight Public Sector,Inc. 59288 4,152.68 Computers,SofNvare/Hardware
Insight Public Sector,Inc. 59451 5,414.39 Computers,Software/HaNware
International Business Machines 59289 6,592.17 Computer Applications&Services
Ind.Union of Oper Eng.AFL CIO Local 59290 4,677.23 Dues Deductions
Intratek Computer,Inc. 59452 483.60 Network/Server/Printer Maintenance Services
Invensys Systems,Inc. 1297 1,866.32 Electrical/Electronic Equipment,Pads&Repairs
Ironman Pans&Services 59291 164.59 Repair&Maintenance Services and/or Supplies
Irvine Ranch Water District 59463 85.29 Water Use
Jays Catering 59292 1,TT4.71 Catering Services
Jays Catering 59454 531.50 Catering Services
Jobs Available,Inc. 59293 45.00 Notices&Ads
John S.Anderson 59526 438.01 Meeting/Tmining Expense Reimbursement
Johnstone Supply 592M 342.85 Repair&Maintenance Services and/or Supplies
JP Morgan Chase Bank,NA 59222 60,659.78 Purchasing Card Program for Miscellaneous Parts and Supplies
Kars Advance Materials,Inc. 59296 4,950.00 Repair&Maintenance Services and/or Supplies
Keenan&Associates 59297 3,316.66 Professional Services/worker's Compensation Program
Kemim Water Solutions 1288 40,581.04 Chemicals,Water/Wastevater Treatment
Karim Water Solutions 1307 40,461.17 Chemicals,WaterMastewater Treatment
Ken A.Sakamoto 59375 383.01 MeetingRreining Expense Reimbursement
Kroll Cyber Security,Inc. 59298 7,217.86 Human Resource Services
Lab Support 59299 8,162.14 Professional ServicesRemporary Services
Laser Impressions,Inc. 59455 1,006.29 Facilities,Maintenance,Services&Supplies
Lexis-Nexis 59300 6,440.00 Books&Publications On-Line
Lai Perez 59373 145.00 Meeting/rmining Expense Reimbursement
Lisa K.Haney 59521 488.75 Meeting/rreining Expense Reimbursement
Los Angeles County 59456 2,378.50 Governmental Agency Fees&Charges
Luccfs Gourmet Foods,Inc. 59457 37.94 Catering Services
Mail Dispatch,LLC 59301 314.70 Mail Delivery Service
Malcolm Firma,Inc. 59458 11,839.58 Professional Servires/Engineedng Design Services
Marc A.Brown 59519 1,120.02 Meeting/Raining Expense Reimbumement
Marvac Electronics 59302 19.87 Electrical/Electamic Equipment,Pans&Repairs
Marvac Electronics 59469 30.23 Electrical/Electronic Equipment,Pads&Repairs
Matheson To Gas,Inc. 59303 1,059.66 Laboratory Services&Supplies
Matheson Td Gas,Inc. 59460 329.28 Laboratory Services&Supplies
Maxim Security Systems 59461 2,101.63 Safety,Security,Health Equipment,Supplies,and Services
McMaster-Carr Supply Co. 59304 187.26 Repair&Maintenance Services and/or Supplies
McMaster-Carr Supply Co. 59462 632.75 Repair&Maintenance Services and/or Supplies
Mesa Consolidated Water District 59305 39.90 Water Use
Michael T.Dorman 59520 214.50 Meeting/Training Expense Reimbursement
Mine Safety Appliance 1312 1,537.47 Electrical/Electronic Equipment,Parts&Repairs
Modus Ediscovery 59382 27,378.80 Professional Services-Legal
Molecular Toxicology,Inc. 59463 113.05 Laboratory Services&Supplies
Monterey Bay Aquarium Research Institute 59306 1,822.99 Professional Services/Ocean Monitoring Studies
MSC Industrial Supply Co. 59464 366.44 Repair&Maintenance Services and/or Supplies
EXHIBITA
nnrztwmm Page 4 of 8 1WMO13
Return to Anemia Report
Claims Paid From 9/16/13 to 9/30113
Vendor Warrant No. Amount Description
MYlhics,Inc. 59465 441.64 Software-Perpetual License for Oracle Data Base-Enterprise Edition,Maim.&Support
Ncompliance Services 59466 742.14 Professional Organizations Meetingaruning/Membership
Neal Supply Co. 59307 129.60 Repair&Maintenance Services and/or Supplies
Neopost USA Inc. 59467 63.54 Equipment Lease/Postage Meter
NehwrkReet,Inc. 59308 3,723.30 Soffeare Maintenance Agreement
Netes,kRinit,Inc. 59468 3,123.84 Sufferers Maintenance Agreement
Na.*Electronics 59309 578.58 Electrical/Electronic Equipment,Parts&Repairs
Norcal Controls Incorporated! 59310 1,279.78 Repair&Maintenance Services and/or Supplies
OCEA 59311 692.25 Dues Deductible
Office Depot 59312 259.02 Office Supplies
Office Depot 59469 1,867.37 Office Supplies
Office Team 59313 840.00 Professional Services/Temporary Services
Office Team 59470 1,512.00 Professional Serviceed'emporary Services
Olin Corporation 59471 22,943.54 Chemicals,WatenWasteeater Treatment
Omega Industrial Supply,Inc. 59472 2,375.42 Janitor&Household Service&Supplies
OneSoume Distributors,Inc. 59314 5,327.58 Elecidcal/Electronic Equipment,Pans&Repairs
OneSource Distributors,Inc. 59473 2,926.70 Electrical/Electronic Equipment,Pads&Repairs
Orange Coast Auto Body,Inc. 59474 2,126.22 Autos.Trucks&Marine Equipment,Parts,Accessories&Services
Orange County Auto Pads 59475 475.22 Truck Supplies
Orange County Hose Company 59315 7.29 Miscellaneous Pads and Supplies
Orange County Sanitation District 59527 1,447.79 Petty Cash Expense
Orange County Sheriff 59317 600.08 Judgments Payable
Orange County United Way 59318 40.00 Employee Contributions
PAC 59319 1,212.47 Laboratory Services&Supplies
Pacific Mechanical Supply 12H 1,041.41 Repair&Maintenance Services and/or Supplies
Pacific Mechanical Supply 1313 2,336.02 Repair&Maintenance Services and/or Supplies
Parker Supply Company 1314 11,796.62 Miscellaneous Pads and Supplies
PBS&J 59410 8,600.00 Professional Servicee/Engineenng Design Services
PCB Piezotimmes,Inc. 59320 140.59 Electrical/Electronic Equipment,Pads&Repairs
PCB P,.Jonics.Inc. 59476 3,585.16 Electrical/Electronic Equipment,Pads&Remains
Peace ORcere Council of CA 59321 2,035.50 Dues Deductions,Supervisors&Professionals
Performance Pipeline Technologies 59322 6,400.00 Professional Services/CCTV Inspection/Semi ine Cleaning
Performance Pipeline Technologies 59477 2,495.00 Professional Servicee/CCN Inspection/Semiline Cleaning
PL Hawn Company,Inc. 59478 215.91 Repair&Maintenance Services and/or Supplies
Polydyne,Inc. 1308 1P,414.87 Chemicals,Water/Wastewater Treatment
Penton Industries,Inc. 59479 4,473.78 Laboratory Services&Supplies
Port Supply 59480 22.26 Autos,Trucks&Marne Equipment,Parts,Accessories&Services
Pdasur Distribution,Inc. 59323 391.35 Laboratory Services&Supplies
Prexair Distribution,Inc. 59481 313.20 Laboratory Services&Supplies
Primrose Ice Co.,Inc. 59324 131.25 Water&Ice Services
Primrose Ice Co.,Inc. 59482 131.25 Water&Ice Services
Promme Work Injury Carter 59325 330.00 Medical Services
Projectline Technical Services,Inc. 59327 457.50 Professional Services/Engineering Design Services
Projectline Technical Services,Inc. 59483 931.00 Professional Servicee/Engineenng Design Services
Projects Partners 59326 7,184.58 Professional Serviceed'emporary Employment Services
Propip,Professional Pipe Services 1305 1,550.00 Professional Sarvices/CCTV Sesadine Inspections
Prodemial Overall Supply 1315 1,495.28 Uniforms
Pump Action 594M 9,230.64 Oil Filters
Putzmeister America,Inc. 59485 883.06 Repair&Maintenance Services and/or Supplies
EXHIBITA
nnrztwmm Page 5 of 8 10 MO13
Claims Paid From 9/16/13 to 9/30113
Vendor Warrant No. Amount Description
Concluded Intelligence 59328 894.40 Professional Organiutions Meeting/Training/Membership
Rainbow Disposal Co. 59330 3,499.00 West.Disposal
Faced Engineering&Constroction Inc. 59383 32,716.00 Professtional Services/Scrubber Chemical Feed System
Regents of Umv.of California 59331 750.00 Professional Services
Rehab West,Inc. 59332 1,091.30 Human Resources Services
Reliastar 59486 3,883.69 Voluntary Employee Life&Cancer Insurance
Rentauata,L.L.C. 59333 139.31 Facilities,Maintenance,Services&Supplies
Restek Corp. 12M 545.79 Laboratory Services&Supplies
RMC Water and Environment 593M 10,387.70 Professional Services
RMC Water and Environment 59487 3,293.55 Professional Services
Robed C.Thompson 59524 W5.00 Meeting/Training Expense Reimbursement
Robert G.Walker 59376 2,452.13 Meeting/Training Expense Reimbursement
Robed G.Walker 59525 2,452.13 Meeting/mining Expense Reimbursement
Robed Holdroad 59522 313.92 Meedinganiining Expense Reimbursement
Robedo's Auto Trim Shop 59488 328.60 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Royale Cleaners 59489 47.70 Miscellaneous Services
Safety Max 59490 487.82 Safety,Security,Health Equipment,Supplies,and Services
San Diego/Ovinge Fluid System Technologi 59335 1,200.52 Repair Maintenance Services and/or Supplies
San Diego/Orange Fluid System Technologi 59491 75.83 Repair&Maintenance Services and/or Supplies
Sancon Engineering,Inc. 59223 43,622.50 Repair&Maintenance Services and/or Supplies
Santiago A.Escobar 59370 125.00 Meeting/Tmining Expense Reimbursement
Sari Security Services USA,Inc. 593M 30,526.62 Safety,Security,Health Equipment,Supplies,and Services
Shamrock Supply Co.,Inc. 59338 163.30 Repair&Maintenance Services and/or Supplies
Shureluck Sales&Engineering 59339 68.69 Repair&Maintenance Services and/or Supplies
Siemens Water Technologies Corp. 13M 1,479.49 Repair&Maintenance Services and/or Supplies
Simon L.Widened 59377 457.85 MeetingRreining Expense Reimbursement
Skater,Inc. 59340 8,950.00 Laboratory Services&Supplies
So.Cal Gas Company 59341 18,070.79 Utilities
South Coast At Quality Management Distr 59343 1,124.33 Governmental Agency Fees&Charges
South Coast Environmental Co. 59336 765.00 Professional Services-Air Quality Monitoring
Southern California Edison 59224 458,187.15 Utilities
Southwest Concrete 59344 484.81 Repair&Maintenance Services and/or Supplies
Sparkled-Dallas 59492 2,237.40 Miscellaneous Services
Stanek Constructors Inc 59389 30,335.83 Construction
Staples 59493 1,454.76 Once Supplies
Statewide Traffic Safety&Signs 59494 280.80 Miscellaneous Pads and Supplies
Sunset Industrial Pads 59345 321.84 Repair&Maintenance Services and/or Supplies
SW RCS Accounting Office 59528 179.00 Governmental Agency Fes&Charges
Synagro West,Inc. 59385 828,392.76 Biosolids Management
TestAmerica Ontario 1301 1,861.00 Laboratory Services&Supplies
Thatcher Company Of California 59225 42.173.37 Chemicals,WaterNyastewater Treatment
Thatcher Company Of California 59386 53,814.84 Chemicals,WatinnWastewiter Treatment
The Orange County Register 59316 3,700.00 Notices&Ads
The Rochester Corporation 59495 1,507.29 ElectricaVElectronic Equipment,Paris&Repairs
The Standard Insurance Company 59346 2,594.18 Disability Instance
Theodore Robins Ford 591 524.53 Autos,Trucks&Marine Equipment,Pads,Accessories 8 Services
Thermo Electron NOM America,L.L.C. 1302 185.75 Laboratory Services&Supplies
Thermo Electron Nodh America,L.L.C. 1316 12,865.00 Laboratory Services&Supplies
Thompson Industrial Supply,Inc. 1303 511.27 Repair&Maintenance Services and/or Supplies
EXHIBITA
nnrzrwmm Page 6 of 8 IWMO13
Return to Anemia Report
Claims Paid From 9/16/13 to 9/30113
Vendor Warrant No. Amount Description
Tiano Construction 59348 13,576.00 Facilities,Maintenance,Services&Supplies
Titan Power Inc. 59496 937.01 Battery Replacement
Tongs Lock&Safe Service&Sales 59349 1,650.89 Repair&Maintenance Services and/or Supplies
Tongs Lock&Safe Service&Sales 59497 18.90 Repair&Maintenance Services and/or Supplies
Toshiba Business Solutions USA Inc. 59498 1,893.47 Computers,Software/HaNWare&Managed Services
Tobil-Wistem,Inc. 59499 961 Repair&Maintenance Services and/or Supplies
Traci Inc. 59350 12,297.60 Computer Applications&Services
Trans U.S.Inc 59351 90.98 Repair&Maintenance Services and/or Supplies
Triad Pacific 59500 2,200.00 Freight
Tula Ranch/Magan Farms 59387 311,501.84 Biosolids Management
Two Wheels One Planet 59352 570.74 Autos,Trucks&Marine Equipment,Parts,Accessories&Services
Two Wheels One Planet 59501 13.76 Autos,Trucks&Manne Equipment,Parts,Accessories&Services
U Line 59502 249.56 Miscellaneous Parts and Supplies
U S Bank 59353 1,700.00 Annual COP Administrative Fee
Ultra Scientific 59354 400.97 Laboratory Services&Supplies
Ultra Scientific 59503 459.43 Laboratory Services&Supplies
Union Bank of California 59365 960.01 Banking Services
United Parcel Service 59356 453.90 Freight Services
United Parcel Service 595N 266.19 Freight Services
United States Department Of The Treasury 59357 399.86 Judgments Payable
Universal Flooring Systems,Inc. 59368 486.00 Facilities,Maintenance,Services&Supplies
US Peroxide,L.L.C. 59226 124,439.67 Chemicals,WatenWastewater Treatment
Utility Systems,Science&Software Inc. 59505 7,725.00 Professional Services/Pharm.Pilot Protect Flow Monitoring
Valve Automation&Controls 59506 919.48 Repair&Maintenance Services and/or Supplies
Vapex Products,Inc. 59369 16.839.42 Electrical/Electronic Equipment,Parts&Repairs
Vattern Industrial Systems,Lie 59507 12,588.93 Professional Services/Construction Consulting Services
Veterinary Pet Insurance Company 59360 836.21 Employee Voluntary Benefits
Village Nurseries 59361 524.87 Repair&Maintenance Services and/or Supplies
Village Nurseries 59508 88.16 Repair&Maintenance Services and/or Supplies
Vision Internet Providers,Inc 59362 1,050.00 Professional Services/VJeb Design Services
Vortex Corp. 13N 1,854.72 Repair&Maintenance Services and/or Supplies
Vortex Corp. 1317 1,737.40 Repair&Maintenance Services and/or Supplies
W.M.Lyles Co. 59227 N.158.75 Consimdion
W.M.Lyles Co. 59390 963,606.85 Construction
Water Environment Federation 59509 374.00 Professional Organizations MeetingRraining/Membership
WateReuse Association 59510 475.00 Professional Organizations Meetingnmining/Membeiship
Winds Sanitary Supply 59511 732.58 Janitor&Household Service&Supplies
Wayne Perry Inc 59512 1,900.00 Laboratory Services&Supplies
West Life Supply Company,Inc. 59363 201.20 Electrical/Electronic Equipment,Pads&Repairs
West Lite Supply Company,Inc. 59513 17.34 Electncal/Electronic Equipment,Paris&Repairs
White Star Pools 59364 620.00 Repair&Maintenance Services and/or Supplies
WPL Publishing 59514 369.00 Books&Publications
Wumbus Corporation 59515 1,088.63 Safety,Security,Health Equipment,Supplies,and Services
Xerox Corporation 1318 129.43 Computers,Software/HaNware&Managed Services
Xylem Water Solutions 59365 1,579.71 Repair&Maintenance Services and/or Supplies
Yale/Chase Materials Handling,Inc. 59366 157.57 Electrical/Electronic Equipment,&Electric Carl Parts&Repairs
Yale/Chase Materials Handling,Inc. 59516 161.38 Electrical/Electronic Equipment,&Electric Cad Parts&Repairs
Yoiba Linda Water District 59368 54.24 Utilities
24 Hour Fire Protection,Inc. 59392 127.50 Repair&Maintenance Services and/or Supplies
EXHIBITA
fn¢mi Page 7 of 8 IWMO13
Claims Paid From 9/16/13 to 9/30113
Vendor Warrant No. Amount Description
Total Accounts Payable-Warrants $ 5,746,428.28
Payroll Disbursements
Employee Paychecks 51770 - 51816 $ 8g952.86 Biweekly Payroll(9/18/13)'
Employee Paychecks 51881 - 51883 8,773.74 Interim Payroll-Retirements 8 Resignations(9/26/13)
Employee Paychecks 51884 - 51885 39,336.38 Interim Payroll-Leave Payouts(9/26/13)
Direct Deposit Statements 343141-343710 1,409,511.50 Biweekly Payroll(9/18/13)
Total Payroll Disbursements $ 1,542,574.4B 'Check numbers 51817-51880 to W used in future period
Wire Transfer Payments
OCSD Payroll Taxes,&Contributions $ 798,471.68 Biweekly Payroll(9118/13)
Union Bank of California 10,198.56 Workers'Compensation Services(9/16/13)
J R Filanc Construction 2,070,728.99 Consimdion Pl-100IPP39 WIRET(9/26113)
Magnus Pacific Corporation 1,227,466.50 Construction 5-58D1PP5(9116113)
Total Wire Transfer Payments $ 4,106,865.73
Total Claims Paid 9116113-9130113 $ 11,391
3 EXIBIT
1,111r Page 8 of 8 IWMO1
m 3
ITEM NO. 2A
Orange County Sanitation District
MINUTES
BOARD MEETING
September 25, 2013
1 SANITgTj�y
Q ?
¢ e�
o �
Fcl�N HE ENv����
Administration Building
10844 Ellis Avenue
Fountain Valley, California 92708-7018
09/2W13 Minutes of Board Meeting Page 1 of 8
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was
held on September 25, 2013, at 6:30 p.m., in the Administration Building. Director Curry
delivered the invocation and led the Pledge of Allegiance.
The Clerk of the Board declared a quorum present as follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Troy Edgar, Chair Richard Murphy
X John Anderson, Vice Chair Gene Hernandez
X Tom Beamish Rose Espinoza
X David Benavides Sal Tinajero
X Steven Choi Christina Shea
X Keith Curry Rush Hill
X Tyler Diep AI Krippner
X James M. Ferryman Bob Ooten
X Steven Jones Kris Beard
X Peter Kim Gerard Goedhart
X Lucille Kring Jordan Brandman
X Michael Levitt Gordon Shanks
X Brett Murdock Roy Moore
X Steve Nagel Mark McCurdy
X Prakash Narain Doug Bailey
X Scott Nelson Constance Underhill
X Janet Nguyen Shawn Nelson
X John Nielsen Jerry Amante
X Brad Reese Greg Mills
X Gregory Sebourn Jan Flory
Joe Shaw X Joe Carchio
X David Shawver Carol Warren
X Fred Smith Steve Berry
X Teresa Smith Mark Murphy
X John Withers Douglas Reinhart
STAFF MEMBERS PRESENT: Jim Herberg, General Manager; Bob Ghirelli, Assistant
General Manager; Nick Kanetis, Director of Engineering, Nick Arhontes, Director of
Facilities Support Services; Ed Torres, Director of Operations and Maintenance;
Lorenzo Tyner, Director of Finance & Administrative Services; Jeff Reed, Director of
Human Resources; Maria E. Ayala, Clerk of the Board; Janine Aguilar, Jennifer Cabral;
Jim Colston; Norbert Gaia; Kelly Lore; Rich Spencer, and Paula Zeller.
OTHERS PRESENT: Brad Hogin, General Counsel, and Jim Ruth, Consultant.
09125 13 Minutes of Board Meeting Page 2 of 8
PUBLIC COMMENTS:
None.
REPORTS:
John Anderson, Board Vice-Chair, reported on the recent OCSD VIP (Volunteer
Incentive Program) event.
General Manager, Jim Herberg, reported on various items from his monthly status
report, including: a chemical fire near the Santa Ana River; Plant Tours for foreign
officials from Abu Dhabi and China; Coastal Clean-Up Day; Nick Kanetis presenting at
WACO; Lorenzo Tyner presenting at the OCERS Directors' Meeting; etc.
Mr. Herberg also announced that his workplan for the next fiscal year is on the agenda
tonight for the Board's approval. He also reminded the Board that the next GWRS
Committee Meeting will be held on Monday and the second Board Workshop will be
held on October 2.
He also announced that the OCSD CIP Annual Report was being provided tonight to the
Board in their meeting folders for their information.
RATIFICATION OF PAYMENT OF CLAIMS:
1. MOVED, SECONDED, AND DULY CARRIED: Ratify payment of claims of the
District, by roll call vote, as follows:
Claims Paid for the Period Ending: 08/15/13 08/31/13
Totals $7,238,119.99 $9,244,149.29
Directors Curry, Diep, Nguyen, Nielsen, and Alternate Director Carchio.
CONSENT CALENDAR:
2. A. MOVED, SECONDED, AND DULY CARRIED: Approve minutes for the
Regular Board Meeting held on August 28, 2013; and
B. Approve minutes for the Special Board Meeting held on September 11,
2013.
3. A. MOVED, SECONDED, AND DULY CARRIED: Receive and file the
General Manager's FY 2012—2013 Work Plan Year-End Report; and
B. Approve the General Managers FY 2013—2014 Work Plan
09125113 Minutes of Board Meeting Page 3 of 8
4. A. MOVED, SECONDED, AND DULY CARRIED: Approve a decrease in the
budget for Plant Water System Rehabilitation at Plant No.1, Project No.
P1-112, by$475,000 for a total project budget of$9,094,000; and
B. Approve an increase in the budget for Plant Water System Rehabilitation
at Plant No. 2, Project No. P2-101, by $475,000 for a total project budget
of$4,484,000; and
C. Approve plans and specifications for Plant Water System Rehabilitation at
Plant No. 1, Project No.P1-112, and Plant Water System Rehabilitation at
Plant No. 2, Project No. 132-101, on file at the Office of the Clerk of the
Board; and
D. Approve Addendum Nos. 1, 2, and 3 to the plans and specifications; and
E. Receive and file bid tabulation and recommendation; and
F. Award a construction contract to W. M. Lyles Co. for Plant Water System
Rehabilitation at Plant No. 1, Project No. P1-112, and Plant Water System
Rehabilitation at Plant No. 2, Project No. P2-101, for a total amount not to
exceed $6,038,000; and
G. Approve a contingency of $374,300 (10%) for Plant Water System
Rehabilitation at Plant No. 1, Project No. P1-112; and
H. Approve a contingency of $275,400 (12%) for Plant Water System
Rehabilitation at Plant No. 2, Project No. P2-101.
STEERING COMMITTEE:
5. MOVED, SECONDED, AND DULY CARRIED: Approve minutes for the Steering
Committee Meeting held on August 28, 2013.
OPERATIONS COMMITTEE:
6. MOVED, SECONDED, AND DULY CARRIED: Approve Minutes of September 4,
2013, Operations Committee meeting.
7. A. MOVED, SECONDED, AND DULY CARRIED: Approve a Professional
Services Agreement with Black & Veatch Corporation for providing Gas
Facilities Study for Plants 1 & 2, Project No. SP-141, for an amount not to
exceed $665,021; and
B. Approve a contingency of$13,306 (2%)
09/2W13 Minutes of Board Meeting Page 4 of 8
8. A. MOVED, SECONDED, AND DULY CARRIED: Approve a Professional
Consultant Services Agreement with Carollo Engineers to provide
construction support services for Plant Water System Rehabilitation at
Plant No. 2, Project No. P2-101, for an amount not to exceed $225,108;
and
B. Approve a contingency of$22,511 (10%).
Director Sebourn abstained.
ADMINISTRATION COMMITTEE:
9. MOVED, SECONDED, AND DULY CARRIED: Approve Minutes of the
September 11, 2013 Administration Committee Meeting.
Alternate Director Carchio abstained.
10. MOVED, SECONDED, AND DULY CARRIED: Receive and file report of
reimbursements to Board Members and Staff per Government Code 53065.5 for
the period July 1, 2012 through June 30, 2013.
Director Nguyen and Alternate Director Carchio abstained.
11. A. MOVED, SECONDED, AND DULY CARRIED: Approve the Electronic
Recording Memorandum of Understanding (MOU) with the County of
Orange, Clerk-Recorder's office; and
B. Authorize the Clerk of the Board, or her designee, to transmit/record any
and all required Orange County Sanitation District real property
documents in an electronic format.
Director Nguyen and Alternate Director Carchio abstained.
12. A. MOVED, SECONDED, AND DULY CARRIED: Adopt Resolution No.
OCSD 13-14, authorizing the execution and delivery by the Orange
County Sanitation District of an Installment Purchase Agreement, a Trust
Agreement and a Continuing Disclosure Agreement in connection with the
execution and delivery of Orange County Sanitation District Revenue
Refunding Certificate Anticipation Notes, Series 2013A, authorizing the
execution and delivery of such Notes evidencing principal in an aggregate
amount of not to exceed $135,000,000, approving a Notice of Intention to
Sell, authorizing the distribution of an Official Notice Inviting Bids and an
Official Statement in connection with the offering and sale of such Notes
and authorizing the execution of necessary documents and related
actions; and
09/2W13 Minutes of Board Meeting Page 5 of 8
B. That the Orange County Sanitation District Financing Corporation approve
the documents supporting and authorizing the Notes in an aggregate
amount not to exceed $135,000,000.
Director Curry and Alternate Director Carchio abstained.
13. A. MOVED, SECONDED, AND DULY CARRIED: Approve a Professional
Services Agreement with enfoTech & Consulting, Inc., Specification CS-
2012-52513D, for Implementation of a Commercial-off-the-shelf
Pretreatment Information Management System, for an amount not to
exceed $749,993; and
B. Approve first year technical support and maintenance for the amount of
$65,266; and
C. Approve a contingency of$81,526 (10%).
Alternate Director Carchio abstained.
Director Nelson arrived to the meeting at 6:44 p.m.
The Board meeting recessed at 6:44 p.m.
. . . . . . . . . . . . . . . . . . . . .
ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION
CALL TO ORDER:
Vice-Chair Anderson called the Board of Directors, Orange County Sanitation District
Financing Corporation meeting to order at 6:44 p.m.
ROLL CALL:
Maria E. Ayala, Clerk of Board, announced that the members of the Orange County
Sanitation District Board of Directors are each being compensated $212.50 for the
Board Meeting; there is no additional compensation for the Financing Corporation
Meeting.
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Troy Edgar, Chair Richard Murphy
X John Anderson, Vice Chair Gene Hernandez
X Tom Beamish Rose Espinoza
X David Benavides Sal Tinajero
X Steven Choi Christina Shea
X Keith Curry Rush Hill
X Tyler Diep At Krippner
09/2"3 Minu[ of Boat Meeting Page 6 of 8
X James M. Ferryman Bob Ooten
X Steven Jones Kris Beard
X Peter Kim Gerard Goedhart
X Lucille Kring Jordan Brandman
X Michael Levitt Gordon Shanks
X Brett Murdock Roy Moore
X Steve Nagel Mark McCurdy
X Prakash Narain Doug Bailey
X Scott Nelson Constance Underhill
X Janet Nguyen Shawn Nelson
X John Nielsen Jerry Amante
X Brad Reese Greg Mills
X Gregory Sebourn Jan Flory
Joe Shaw X Joe Carchio
X David Shawver Carol Warren
X Fred Smith Steve Berry
X Teresa Smith Mark Murphy
X John Withers Douglas Reinhart
APPROVAL OF MINUTES:
MOVED, SECONDED, AND DULY CARRIED: If no corrections or amendments are
made, the minutes for the meeting held on September 26, 2012, will be deemed
approved and be so ordered by the Vice-Chair.
ACTION ITEM:
MOVED, SECONDED, AND DULY CARRIED: Adopt Resolution No. FC-20, a
resolution of the Board of Directors of the Orange County Sanitation District Financing
Corporation Authorizing the Execution and Delivery by the Corporation of an Installment
Purchase Agreement and a Trust Agreement in Connection with the Execution and
Delivery of Orange County Sanitation District Revenue Refunding Certificate
Anticipation Notes, Series 2013a, Authorizing the Execution and Delivery of Such Notes
Evidencing Principal in an Aggregate Amount of not to Exceed $135,000,000 and
Authorizing the Execution of Other Necessary Documents and Related Actions. (See
Agenda Report for Item No. 12)
Director Curry abstained.
The meeting of the Board of Directors, Orange County Sanitation District Financing
Corporation adjourned at 6:46 p.m.
. . . . . . . . . . . . . . . . . .
The meeting of the Board of Directors, Orange County Sanitation District reconvened at
6:46 p.m.
09/2W13 Minutes of Board Meeting Page 7 of 8
CLOSED SESSION
CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE
SECTIONS: 54956.9(d)(1), 54956.9(d)(4), and 54957.6.
The Board convened in closed session at 6:49 p.m. to discuss seven items.
Confidential Minutes of the Closed Session have been prepared in accordance with the
above Government Code Sections and are maintained by the Clerk of the Board in the
Official Book of Confidential Minutes of Board and Committee Closed Meetings.
RECONVENE IN REGULAR SESSION: The Committee reconvened in regular session
at 7:10 p.m.
Director Nagel recused himself from Closed Session Item #134.
CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED
SESSION:
Brad Hogin, General Counsel, reported out that the Board reached a unanimous
decision to authorize General Counsel to appear and defend the interest of the district in
regards to Closed Session Item No. B3 and B4.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA
ITEMS, IF ANY:
Director Nguyen provided a brief report on the County's position regarding local elected
officials being appointed to the OCERS Board.
ADJOURNMENT:
The Chair adjourned the meeting at 7:15 p.m. until the Special Board Meeting on
October 2, 2013 at 6:00 p.m.
Maria E. Ayala, Clerk of the Board
09/2W13 Minutes of Board Meeting Page 8 of 8
ITEM NO. 26
Orange County Sanitation District
MINUTES
SPECIAL MEETING
2013 Strategic Plan
Board Workshop
October 2, 2013
ANITgT� 9
= L'1
� 9
O y
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708-7018
10/02/13 Minutes of Board Workshop Page 1 of 4
ROLL CALL
A Special Meeting of the Board of Directors of the Orange County Sanitation District
was held on October 2, 2013 at 6:00 p.m., in the District's Administrative Offices.
Active and alternate Directors present were as follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
X Troy Edgar, Chair X Richard Murphy
X John Anderson, Vice Chair X Gene Hernandez
X Tom Beamish X Rose Espinoza
X David Benavides Sal Tinajero
X Steven Choi X Christina Shea
A Keith Curry Rush Hill
X Tyler Diep Al Krippner
X James M. Ferryman X Bob Ooten
-XI Steven Jones Kris Beard
X Peter Kim Gerard Goedhart
X Lucille Kring Jordan Brandman
X Michael Levitt Gordon Shanks
X Brett Murdock X Roy Moore
X Steve Nagel X Mark McCurdy
X Prakash Narain Doug Bailey
A Scott Nelson X Constance Underhill
X Janet Nguyen Shawn Nelson
X John Nielsen Jerry Amante
X Brad Reese Greg Mills
X Gregory Sebourn Jan Flory
X Joe Shaw X Joe Carchio
A David Shawver Carol Warren
X Fred Smith Steve Berry
X Teresa Smith Mark Murphy
X John Withers Douglas Reinhart
STAFF MEMBERS PRESENT: Jim Herberg, General Manager; Bob Ghirelli,
Assistant General Manager; Nick Kanetis, Director of Engineering; Nick Arhontes,
Director of Facilities Support Services; Jeff Reed, Director of Human Resources; Ed
Torres, Director of Operations & Maintenance; Lorenzo Tyner, Director of Finance &
Administrative Services; Maria Ayala, Clerk of the Board; Jennifer Cabral; Dean
Fisher; Norbert Gala; Al Garcia; Rich Spencer; and Rob Thompson.
10/02/13 Minutes of Board Workshop Page 2 of 4
OTHERS PRESENT: Brad Hogin, General Counsel; Brent Ives, Consultant.
PUBLIC COMMENTS
None.
Opening Remarks:
Chair Edgar welcomed everybody to the second workshop and briefly reviewed the
meeting's agenda.
Strategic Goals 2007-2013
General Manager, Jim Herberg, summarized the work accomplished in the first
strategic plan workshop from September 11; he also outlined the strategic initiatives
that would be presented tonight. He announced that the Board can expect a
completed and formal Strategic Plan to be brought before the Board for approval at
the November or December Board Meeting.
Mr. Herberg introduced Brent Ives. Mr. Ives would be facilitating tonight's workshop.
Mission and Vision Statements
Mr. Ives presented the Board with the draft Vision Statement. This draft
incorporated the input of the Board from Workshop #1.
Strategic Initiatives:
Members of the Executive Management Team presented information on eight key
issues: 1) Legislative Advocacy and Public Outreach (Bob Ghirelli); 2) Future
Biosolids Management Options (Nick Kanetis): 3) Odor Control (Nick Kanetis); 4)
Future Water Recycling Options (Nick Kanetis); 5) Cessation of Disinfection of
OCSD's Ocean Discharge (Ed Torres); 6) Local Sewer Transfers (Nick Arhontes);
and 7)Workforce Planning and Workforce Development (Jeff Reed).
The Board held brief dialogue after each presentation, with staff responding to
questions.
Mr. Herberg concluded the presentations by giving a brief overview of the General
Manager's Workplan for the next fiscal year. Mr. Herberg also reported on the
District's asset management program and other operational efficiencies.
10/02/13 Minutes of Board Workshop Page 3 of 4
CONCLUSION
Mr. Ives concluded the meeting by summarizing the strategic initiatives, and the next
steps. The strategic initiatives and new vision statement will be compiled into a new
Strategic Plan, and will be brought to the Board for approval at a future meeting.
Chair Edgar thanked the staff for their presentations, and thanked the Directors and
Alternate Directors for attending.
ADJOURNMENT:
The Chair adjourned the meeting at 8:00 p.m. until the next regular meeting on
October 23, 2013, at 6:30 p.m.
Maria E. Ayala, Clerk of the Board
10/02/13 Minutes of Board Workshop Page 4 of 4
BOARD OF DIRECTORS Meeting Date I TO Bd.of Dir.
— 1O/23/13
AGENDA REPORT ItemNumber Item Number
a
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Kanetis, Director of Engineering
CIP Project Manager: Wendy Sevenandt
SUBJECT: BOILER SYSTEM REHABILITATION AND SCRUBBERS H & I
DEMOLITION AT PLANT NO. 2, PROJECT NO. P2-106
GENERAL MANAGER'S RECOMMENDATION
A. Approve Plans and Specifications for Boiler System Rehabilitation and Scrubbers
H & I Demolition at Plant No. 2, Project No. P2-106, on file at the Office of the
Clerk of the Board; and
B. Approve Addendum Nos. 1 and 2 to the plans and specifications; and
C. Award a construction contract to Irwin Industries for the Boiler System
Rehabilitation and Scrubbers H & I Demolition at Plant No. 2, Project No. P2-106,
for a total amount not to exceed $1,472,993; and
D. Approve a contingency of$147,299 (10%).
SUMMARY
Boiler System Rehabilitation and Scrubbers H & I Demolition at Plant No. 2, Project
No. P2-106, will replace feedwater and burner systems at the existing boilers at Plant
No. 2 and demolish H & I Scrubbers including associated equipment, ductwork, piping,
and electrical systems. This work was designed by Dudek & Associates, Inc. (Dudek)
and the design was completed in July 2013.
The Orange County Sanitation District (Sanitation District) advertised for bids on
August 6, 2013. Two sealed bids were received on September 19, 2013. The bids
were evaluated in accordance with the Sanitation District policies and procedures. Irwin
Industries was deemed the lowest responsive, responsible bidder.
Staff recommends awarding a construction contract to Irwin Industries for Boiler System
Rehabilitation and Scrubbers H & I Demolition at Plant No. 2, Project No. P2-106, for a
total amount not to exceed $1,472,993.
Page 1 of 2
Summary information on the bid opening for the Boiler System Rehabilitation and
Scrubbers H & I Demolition at Plant No. 2, Project No. P2-106, is as follows:
Project Budget $ 2,906,000
Construction Contract Budget $ 1,600,000
Engineer's Estimate $ 1,600,000
Lowest Responsive, Responsible Bid $ 1,472,993
High Bid $ 2,440,309
Bidder Amount of Bid
Irwin Industries $ 1,472,993
Environmental Construction, Inc. $ 2,440,309
PRIOR COMMITTEE/BOARD ACTIONS
None.
ADDITIONAL INFORMATION
None.
CEQA
A Notice of Exemption was filed and recorded on April 14, 2011.
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
This request complies with authority levels of the Sanitation District's Delegation of
Authority. This item has been budgeted (Line item: FY 2013-14 Update, Page A-10)
and the budget is sufficient for the recommended action.
Date of Approval Contract Amount Contingency
10/23/13 $1,472,993 $147,299 (10%)
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the
complete agenda package and attachments:
• Construction Contract
NK:WS:dm:gc
Page 2 of 2
Return to Aaenda Report
PART A
CONTRACT AGREEMENT
C-CA-071913
TABLE OF CONTENTS
CONTRACT AGREEMENT
SECTION - 1 GENERAL CONDITIONS..................................................................1
SECTION -2 MATERIALS AND LABOR.................................................................4
SECTION -3 PROJECT..........................................................................................5
SECTION -4 PLANS AND SPECIFICATONS ........................................................5
SECTION -5 TIME OF COMMENCEMENT AND COMPLETION ..........................5
SECTION -6 TIME IS OF THE ESSENCE .............................................................5
SECTION -7 EXCUSABLE DELAYS......................................................................6
SECTION -8 EXTRA WORK...................................................................................6
SECTION -9 CHANGES IN PROJECT...................................................................7
SECTION - 10 LIQUIDATED DAMAGES FOR DELAY.............................................7
SECTION - 11 CONTRACT PRICE AND METHOD OF PAYMENT.........................8
SECTION - 12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF
FUNDS ............................................................................................10
SECTION - 13 COMPLETION.................................................................................10
SECTION - 14 CONTRACTOR'S EMPLOYEES COMPENSATION.......................10
SECTION - 15 SURETY BONDS ............................................................................13
SECTION - 16 INSURANCE....................................................................................13
SECTION - 17 RISK AND INDEMNIFICATION.......................................................21
SECTION - 18 TERMINATION................................................................................21
SECTION - 19 WARRANTY....................................................................................22
SECTION -20 ASSIGNMENT.................................................................................23
SECTION -21 RESOLUTION OF DISPUTES ........................................................23
SECTION -22 SAFETY& HEALTH ........................................................................23
SECTION -23 NOTICES.........................................................................................24
C-CA-071913
Return to Aaenda Report
CONTRACT AGREEMENT
ORANGE COUNTY SANITATION DISTRICT
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H & I DEMOLITION
AT PLANT NO. 2
THIS AGREEMENT is made and entered into, to be effective, October 23, 2013, by and
between Irwin Industries, hereinafter referred to as"CONTRACTOR" and the Orange County
Sanitation District, hereinafter referred to as "OCSD".
WITNESSETH
That for and in consideration of the promises and agreements hereinafter made and exchanged,
OCSD and CONTRACTOR agree as follows:
SECTION-1 GENERAL CONDITIONS
CONTRACTOR certifies and agrees that all the terms, conditions and obligations of the
Contract Documents as hereinafter defined, the location of the job site, and the conditions under
which the Work is to be performed have been thoroughly reviewed, and enters into this Contract
based upon CONTRACTOR's investigation of all such matters and is in no way relying upon
any opinions or representations of OCSD. It is agreed that this Contract represents the entire
agreement. It is further agreed that the Contract Documents are each incorporated into this
Contract by reference, with the same force and effect as if the same were set forth at length
herein, and that CONTRACTOR and its Subcontractors, if any, will be and are bound by any
and all of said Contract Documents insofar as they relate in any part or in any way, directly or
indirectly, to the Work covered by this Contract.
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 1 of 25
A. Contract Documents Order of Precedence
"Contract Documents" refers to those documents identified in the definition of"Contract
Documents" in the General Conditions—Definitions.
1. In the event of a conflict between one Contract Document and any of the other
Contract Documents, the provisions in the document highest in precedence shall be
controlling. The order of precedence of the Contract Documents is as follows:
a. Supplemental Agreements—the last in time being the first in precedence
b. Addenda issued prior to opening of Bids—the last in time being the first in
precedence
c. Contract Agreement
d. Permits and other regulatory requirements
e. Special Provisions
f. General Conditions (GC)
g. Notice Inviting Bids and Instruction to Bidders
h. Geotechnical Baseline Report(GBR), if attached as a Contract Document
I. Plans and Specifications—in these documents the order of precedence shall be:
i. Specifications (Divisions 01-17)
ii. Plans
H. General Requirements (GR)
iv. Standard Drawings and Typical Details
j. CONTRACTOR'S Bid
2. In the event of a conflict between terms within an individual Contract Document, the
conflict shall be resolved by applying the following principles as appears applicable:
a. Figured dimensions on the Contract Documents shall govern. Dimensions not
specified shall be as directed by the ENGINEER. Details not shown or
C-CA-071913
PROJECT NO. P2-10e
BOILER SYSTEM REHABILITATION AND SCRUBBERS H R I DEMOLITION AT PLANT NO.2
CONFORMED
Page 2 of 25
Return to Aaenda Report
specified shall be the same as similar parts that are shown or specified, or as
directed. Full-size details shall take precedence over scale Drawings as to
shape and details of construction. Specifications shall govern as to material
and workmanship.
b. The Contract Documents calling for the higher quality material or workmanship
shall prevail. Materials or Work described in words, which so applied, have a
well known technical or trade meaning shall be deemed to refer to such
recognized standards. In the event of any discrepancy between any Drawings
and the figures thereon, the figures shall be taken as correct.
C. Scale Drawings, full-size details, and Specifications are intended to be fully
complementary and to agree. Should any discrepancy between Contract
Documents come to the CONTRACTOR's attention, or should an error occur in
the efforts of others, which affect the Work, the CONTRACTOR shall notify the
ENGINEER, in writing, at once. In the event any doubts or questions arise with
respect to the true meaning of the Contract Documents, reference shall be
made to the ENGINEER whose written decision shall be final. If the
CONTRACTOR proceeds with the Work affected without written instructions
from the ENGINEER, the CONTRACTOR shall be fully responsible for any
resultant damage or defect.
d. Anything mentioned in the Specifications and not indicated in the Plans, or
indicated in the Plans and not mentioned in the Specifications, shall be of like
effect as if indicated and mentioned in both. In case of discrepancy in the
Plans or Specifications, the matter shall be immediately submitted to OCSD's
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 3 of 25
ENGINEER, without whose decision CONTRACTOR shall not adjust said
discrepancy save only at CONTRACTOR's own risk and expense. The
decision of the ENGINEER shall be final.
In all matters relating to the acceptability of material, machinery or plant equipment;
classifications of material or Work; the proper execution, progress or sequence of the
Work; and quantities interpretation of the Contract Documents, the decision of the
ENGINEER shall be final and binding, and shall be a condition precedent to any payment
under the Contract, unless otherwise ordered by the Board of Directors.
B. Definitions
Capitalized terms used in this Contract are defined in the General Conditions, Definitions.
Additional terms may be defined in the Special Provisions.
SECTION-2 MATERIALS AND LABOR
CONTRACTOR shall furnish, under the conditions expressed in the Plans and Specifications, at
CONTRACTOR'S own expense, all labor and materials necessary, except such as are
mentioned in the Specifications to be furnished by OCSD, to construct and complete the
Project, in good workmanlike and substantial order. If CONTRACTOR fails to pay for labor or
materials when due, OCSD may settle such claims by making demand upon the Surety to this
Contract. In the event of the failure or refusal of the Surety to satisfy said claims, OCSD may
settle them directly and deduct the amount of payments from the Contract Price and any
amounts due to CONTRACTOR. In the event OCSD receives a stop payment notice from any
laborer or material supplier alleging non-payment by CONTRACTOR, OCSD shall be entitled to
deduct all of its costs and expenses incurred relating thereto, including but not limited to
administrative and legal fees.
C-CA-071913
PROJECT NO. P2-10e
BOILER SYSTEM REHABILITATION AND SCRUBBERS H R I DEMOLITION AT PLANT NO.2
CONFORMED
Page 4 of 25
Return to Aaenda Report
SECTION-3 PROJECT
The Project is described as:
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H & I DEMOLITION
AT PLANT NO. 2
SECTION -4 PLANS AND SPECIFICATONS
The Work to be done is shown in a set of Plans and Specifications entitled:
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H & I DEMOLITION
AT PLANT NO. 2
Said Plans and Specifications and any revision, amendments and addenda thereto are attached
hereto and incorporated herein as part of this Contract and referred to by reference.
SECTION—5 TIME OF COMMENCEMENT AND COMPLETION
CONTRACTOR agrees to commence the Project within 15 calendar days from the date set forth
in the "Notice to Proceed"sent by OCSD, unless otherwise specified therein and shall diligently
prosecute the Work to completion within 480 calendar days from the date of the "Notice to
Proceed" issued by OCSD, excluding delays caused or authorized by OCSD as set forth in
Sections 7, 8, and 9 hereof, and applicable provisions in the General Conditions. The time for
completion includes 10 calendar days determined by OCSD likely to be inclement weather when
CONTRACTOR will be unable to work.
In addition, CONTRACTOR shall accomplish such milestones within the periods of performance
set forth in Appendix A of the Special Provisions entitled "Work Completion Schedule."
SECTION—6 TIME IS OF THE ESSENCE
Time is of the essence of this Contract. As required by the Contract Documents,
CONTRACTOR shall prepare and obtain approval of all shop drawings, details and samples,
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 5 of 25
and do all other things necessary and incidental to the prosecution of CONTRACTOR's Work in
conformance with an approved construction progress schedule. CONTRACTOR shall
coordinate the Work covered by this Contract with that of all other contractors, subcontractors
and of OCSD, in a manner that will facilitate the efficient completion of the entire Work and
accomplish the required milestone(s), if any, by the applicable deadline(s) in accordance with
Section 5 herein. OCSD shall have the right to assert complete control of the premises on
which the Work is to be performed and shall have the right to decide the time or order in which
the various portions of the Work shall be installed or the priority of the work of subcontractors,
and, in general, all matters representing the timely and orderly conduct of the Work of
CONTRACTOR on the premises.
SECTION—7 EXCUSABLE DELAYS
CONTRACTOR shall only be excused for any delay in the prosecution or completion of the
Project as specifically provided in General Conditions, "Extensions for Delay", and the General
Requirements, "By CONTRACTOR or Others— Unknown Utilities during Contract Work".
Extensions of time and extra compensation arising from such excusable delays will be
determined in accordance with the General Conditions, "Extension of Time for Delay" and
"Contract Price Adjustments and Payments", and extensions of time and extra compensation as
a result of incurring undisclosed utilities will be determined in accordance with General
Requirements, "By CONTRACTOR or Others— Unknown Utilities during Contract Work".
OCSD's decision will be conclusive on all parties to this Contract.
SECTION—8 EXTRA WORK
The Contract Price as set forth in Section 11, includes compensation for all Work performed by
CONTRACTOR, unless CONTRACTOR obtains a Change Order signed by a designated
representative of OCSD specifying the exact nature of the Extra Work and the amount of extra
compensation to be paid all as more particularly set forth in Section 9 hereof and the General
C-CA-071913
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H R I DEMOLITION AT PLANT NO.2
CONFORMED
Page 6 of 25
Return to Aaende Report
Conditions, "Request for Change (Changes at CONTRACTOR's Request)", "OWNER Initiated
Changes", and "Contract Price Adjustments and Payments".
In the event a Change Order is issued by OCSD pursuant to the Contract Documents, OCSD
shall extend the time fixed in Section 5 for completion of the Project by the number of days, if
any, reasonably required for CONTRACTOR to perform the Extra Work, as determined by
OCSD's ENGINEER. The decision of the ENGINEER shall be final.
SECTION-9 CHANGES IN PROJECT
OCSD may at any time, without notice to any Surety, by Change Order, make any changes in
the Work within the general scope of the Contract Document, including but not limited to
changes:
1. In the Specifications (including Drawings and designs);
2. In the time, method or manner of performance of the Work;
3. In OCSD-furnished facilities, equipment, materials, services or site; or
4. Directing acceleration in the performance of the Work.
No change of period of performance or Contract Price, or any other change in the Contract
Documents, shall be binding until the Contract is modified by a fully executed Change Order.
All Change Orders shall be issued in accordance with the requirements set forth in the General
Conditions, "Request for Change (Changes at CONTRACTOR's Request)" and "OWNER
Initiated Changes'.
SECTION — 10 LIQUIDATED DAMAGES FOR DELAY
Liquidated Damages shall be payable in the amounts and upon the occurrence of such events
or failure to meet such requirements or deadlines as provided in the Special Provisions,
"Liquidated Damages and Incentives."
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 7 of 25
SECTION—11 CONTRACT PRICE AND METHOD OF PAYMENT
A. OCSD agrees to pay and the CONTRACTOR agrees to accept as full consideration for the
faithful performance of this Contract, subject to any additions or deductions as provided in
approved Change Orders, the sum of One Million Four Hundred Seventy-Two Thousand
Nine Hundred Ninety-Three Dollars ($1,472,993) as itemized on the Attached Exhibit"A".
Upon satisfaction of the conditions precedent to payment set forth in the General
Requirements, Additional General Requirements and General Conditions (including but
not limited to Sections entitled "Mobilization Payment Requirements"and "Payment
Itemized Breakdown of Contract Lump Sum Prices"), there shall be paid to the
CONTRACTOR an initial Net Progress Payment for mobilization. OCSD shall issue at the
commencement of the job a schedule which shows:
1. A minimum of one payment to be made to the CONTRACTOR for each successive
four(4)week period as the Work progresses, and
2. The due dates for the CONTRACTOR to submit requests for payment to meet the
payment schedule.
After the initial Net Progress Payment, and provided the CONTRACTOR submits the
request for payment prior to the end of the day required to meet the payment schedule,
the CONTRACTOR shall be paid a Net Progress Payment on the corresponding monthly
payment date set forth in the schedule.
Payments shall be made on demands drawn in the manner required by law, accompanied
by a certificate signed by the ENGINEER, stating that the Work for which payment is
demanded has been performed in accordance with the terms of the Contract Documents,
and that the amount stated in the certificate is due under the terms of the Contract. Payment
applications shall also be accompanied with all documentation, records, and releases as
C-CA-071913
PROJECT NO. P2-108
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 8 of 25
Return to Aaenda Report
required by the Contract, Exhibit A, Schedule of Prices, and General Conditions, "Payment
for Work—General". The Total amount of Progress Payments shall not exceed the actual
value of the Work completed as certified by OCSD's ENGINEER. The processing of
payments shall not be considered as an acceptance of any part of the Work.
B. As used in this Section, the following defined terms shall have the following meanings:
1. "Net Progress Payment" means a sum equal to the Progress Payment less the
Retention Amount and other qualified deductions (Liquidated Damages, stop
payment notices, etc.).
2. "Progress Payment" means a sum equal to:
a. the value of the actual Work completed since the commencement of the Work
as determined by OCSD;
b. plus the value of material suitably stored at the worksite, treatment plant or
approved storage yards subject to or under the control of OCSD since the
commencement of the Work as determined by OCSD;
C. less all previous Net Progress Payments;
d. less all amounts of previously qualified deductions;
e. less all amounts previously retained as Retention Amounts.
3. "Retention Amount"for each Progress Payment means the percentage of each
Progress Payment to be retained by OCSD to assure satisfactory completion of the
Contract. The amount to be retained from each Progress Payment shall be
determined as provided in the General Conditions—"Retained Funds; Substitution of
Securities."
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 9 of 25
SECTION-12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF FUNDS
Pursuant to Public Contract Code Section 22300 at seq., the CONTRACTOR may, at its sole
expense, substitute securities as provided in General Conditions—"Retained Funds;
Substitution of Securities."
SECTION—13 COMPLETION
Final Completion and Final Acceptance shall occur at the time and in the manner specified in the
General Conditions, "Final Acceptance and Final Completion", "Final Payment" and Exhibit A-
Schedule of Prices.
Upon receipt of all documentation, records, and releases as required by the Contract from the
CONTRACTOR, OCSD shall proceed with the Final Acceptance as specified in General Conditions.
SECTION-14 CONTRACTOR'S EMPLOYEES COMPENSATION
A. Davis-Bacon Act:
CONTRACTOR will pay and will require all Subcontractors to pay all employees on said
Project a salary or wage at least equal to the prevailing rate of per diem wages as
determined by the Secretary of Labor in accordance with the Davis-Bacon Act for each craft
or type of worker needed to perform the Contract. The provisions of the Davis-Bacon Act
shall apply only if the Contract is in excess of Two Thousand Dollars ($2,000.00) and when
twenty-five percent (25%) or more of the Contract is funded by federal assistance. If the
aforesaid conditions are met, a copy of the provisions of the Davis-Bacon Act to be complied
with are incorporated herein as a part of this Contract and referred to by reference.
B. General Prevailina Rate:
OCSD has been advised by the State of California Director of Industrial Relations of its
determination of the general prevailing rate of per diem wages and the general prevailing
rate for legal holiday and overtime Work in the locality in which the Work is to be
C-CA-071913
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 10 of 25
Return to Aaende Report
performed for each craft or type of Work needed to execute this Contract, and copies of
the same are on file in the Office of the ENGINEER of OCSD. The CONTRACTOR
agrees that not less than said prevailing rates shall be paid to workers employed on this
public works Contract as required by Labor Code Section 1774 of the State of California.
Per California Labor Code 1773.2, OCSD will have on file copies of the prevailing rate of
per diem wages at its principal office and at each job site, which shall be made available to
any interested party upon request.
C. Forfeiture for Violation:
CONTRACTOR shall, as a penalty to OCSD, forfeit Two Hundred Dollars ($200.00)for
each calendar day or portion thereof for each worker paid (either by the CONTRACTOR or
any Subcontractor under it) less than the prevailing rate of per diem wages as set by the
Director of Industrial Relations, in accordance with Sections 1770-1780 of the California
Labor Code for the Work provided for in this Contract, all in accordance with Section 1775
of the Labor Code of the State of California.
D. Apprentices:
Sections 1777.5, 1777.6, 1777.7 of the Labor Code of the State of California, regarding
the employment of apprentices are applicable to this Contract and the CONTRACTOR
shall comply therewith if the prime contract involves Thirty Thousand Dollars ($30,000.00)
or more.
E. Workdav:
In the performance of this Contract, not more than eight(8) hours shall constitute a day's
work, and the CONTRACTOR shall not require more than eight(8) hours of labor in a
day from any person employed by him hereunder except as provided in paragraph (B)
above. CONTRACTOR shall conform to Article 3, Chapter 1, Part 7 (Section 1810 at
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 11 of 25
seq.) of the Labor Code of the State of California and shall forfeit to OCSD as a penalty,
the sum of Twenty-five Dollars ($25.00)for each worker employed in the execution of
this Contract by CONTRACTOR or any Subcontractor for each calendar day during
which any worker is required or permitted to labor more than eight (8) hours in any one
calendar day and forty (40) hours in any one week in violation of said Article.
CONTRACTOR shall keep an accurate record showing the name and actual hours
worked each calendar day and each calendar week by each worker employed by
CONTRACTOR in connection with the Project.
F. Record of Waaes: Insoection:
CONTRACTOR agrees to maintain accurate payroll records showing the name, address,
social security number, work classification, straight-time and overtime hours worked each
day and week, and the actual per diem wages paid to each journeyman, apprentice,
worker or other employee employed by it in connection with the Project and agrees to
require that each of its Subcontractors do the same. All payroll records shall be certified
as accurate by the applicable CONTRACTOR or Subcontractor or its agent having
authority over such matters.
CONTRACTOR further agrees that its payroll records and those of its Subcontractors shall
be available to the employee or employee's representative, the Division of Labor
Standards Enforcement, and the Division of Apprenticeship Standards and shall comply
with all of the provisions of Labor Code Section 1776, in general. Penalties for non-
compliance with the requirements of Section 1776 may be deducted from Project
payments per the requirements of Section 1776.
C-CA-071913
PROJECT NO. P2-10e
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 12 of 25
Return to Aaenda Report
SECTION— 15 SURETY BONDS
CONTRACTOR shall, before entering upon the performance of this Contract, furnish Bonds
approved by OCSD's General Counsel—one in the amount of one hundred percent(100%)of
the Contract amount, to guarantee the faithful performance of the Work, and the other in the
amount of one hundred percent (100%)of the Contract amount to guarantee payment of all
claims for labor and materials furnished. As changes to the Contract occur via approved
Change Orders, the CONTRACTOR shall assure that the amounts of the Bonds are adjusted to
maintain 100% of the Contract Price. This Contract shall not become effective until such Bonds
are supplied to and approved by OCSD. Bonds must be issued by a Surety authorized by the
State Insurance Commissioner to do business in California. The Performance Bond shall
remain in full force and effect through the warranty period, as specified in Section 19 below. All
Bonds required to be submitted relating to this Contract must comply with California Code of
Civil Procedure Section 995.630. Each Bond shall be executed in the name of the Surety
insurer under penalty of perjury, or the fact of execution of each Bond shall be duly
acknowledged before an officer authorized to take and certify acknowledgments, and either one
of the following conditions shall be satisfied:
A. A copy of the transcript or record of the unrevoked appointment, power of attorney, by-
laws, or other instrument, duly certified by the proper authority and attested by the seal of
the insurer entitling or authorizing the person who executed the Bond to do so for and on
behalf of the insurer, is on file in the Office of the County Clerk of the County of Orange; or
B. A copy of a valid power of attorney is attached to the Bond.
SECTION—16 INSURANCE
CONTRACTOR shall purchase and maintain, for the duration of the Contract, insurance against
claims for injuries to persons, or damages to property which may arise from or in connection
with the performance of the Work hereunder, and the results of that Work by CONTRACTOR,
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 13 of 25
its agents, representatives, employees, or Subcontractors, in amounts equal to the
requirements set forth below. CONTRACTOR shall not commence Work under this Contract
until all insurance required under this Section is obtained in a form acceptable to OCSD, nor
shall CONTRACTOR allow any Subcontractor to commence Work on a subcontract until all
insurance required of the Subcontractor has been obtained. CONTRACTOR shall maintain all
of the foregoing insurance coverages in force through the point at which the Work under this
Contract is fully completed and accepted by OCSD pursuant to the provisions of the General
Conditions, "Final Acceptance and Final Completion". Furthermore, CONTRACTOR shall
maintain all of the foregoing insurance coverages in full force and effect throughout the warranty
period, commencing on the date of Final Acceptance. The requirement for carrying the
foregoing insurance shall not derogate from the provisions for indemnification of OCSD by
CONTRACTOR under Section 17 of this Contract. Notwithstanding nor diminishing the
obligations of CONTRACTOR with respect to the foregoing, CONTRACTOR shall subscribe for
and maintain in full force and effect during the life of this Contract, inclusive of all changes to the
Contract Documents made in accordance with the provisions of the General Conditions,
"Request for Change (Changes at CONTRACTOR's Request)" and/or"OWNER Initiated
Changes", the following insurance in amounts not less than the amounts specified. OCSD
reserves the right to amend the required limits of insurance commensurate with the
CONTRACTOR's risk at any time during the course of the Project. No vehicles may enter
OCSD premises/worksite without possessing the required insurance coverage.
CONTRACTOR's insurance shall also comply with all insurance requirements prescribed by
agencies from whom permits shall be obtained for the Work and any other third parties from
whom third party agreements are necessary to perform the Work (collectively, the "Third
Parties"), The Special Provisions may list such requirements and sample forms and
requirements from such Third Parties may be included in an attachment to the General
C-CA-071913
PROJECT NO. P2-10e
BOILER SYSTEM REHABILITATION AND SCRUBBERS H R I DEMOLITION AT PLANT NO.2
CONFORMED
Page 14 of 25
Return to Aaende Report
Requirements. CONTRACTOR bears the responsibility to discover and comply with all
requirements of Third Parties, including meeting specific insurance requirements, that are
necessary for the complete performance of the Work. To the extent there is a conflict between
the Third Parties' insurance requirements and those set forth by OCSD herein, the
requirement(s) providing the more protective coverage for both OSCD and the Third Parties
shall control and be purchased and maintained by CONTRACTOR.
A. Limits of Insurance
1. General Liability: Five Million Dollars ($5,000,000) per occurrence and a general
aggregate limit of Five Million Dollars ($5,000,000)for bodily injury, personal injury
and property damage. Coverage shall include each of the following:
a. Premises-Operations.
b. Products and Completed Operations, with limits of at least Five Million Dollars
($5,000,000) per occurrence and a general aggregate limit of Five Million
Dollars ($5,000,000)which shall be in effect at all times during the warranty
period set forth in the Warranty section herein, and as set forth in the General
Conditions, "Warranty(CONTRACTOR's Guarantee)", plus any additional
extension or continuation of time to said warranty period that may be required
or authorized by said provisions.
C. Broad Form Property Damage, expressly including damage arising out of
explosion, collapse, or underground damage.
d. Contractual Liability, expressly including the indemnity provisions assumed
under this Contract.
e. Separation of Insured Clause, providing that coverage applies separately to
each insured, except with respect to the limits of liability.
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 15 of 25
f. Independent CONTRACTOR's Liability.
To the extent first dollar coverage, including defense of any claim, is not
available to OCSD or any other additional insured because of any SIR,
deductible, or any other form of self insurance, CONTRACTOR is obligated to
assume responsibility of insurer until the deductible, SIR or other condition of
insurer assuming its defense and/or indemnity has been satisfied.
CONTRACTOR shall be responsible to pay any deductible or SIR.
g. If a crane will be used, the General Liability insurance will be endorsed to add
Riggers Liability coverage or its equivalent to cover the usage of the crane and
exposures with regard to the crane operators, riggers and others involved in
using the crane.
h. If divers will be used, the General Liability insurance will be endorsed to cover
marine liability or its equivalent to cover the usage of divers.
2. Automobile Liability: The CONTRACTOR shall maintain a policy of Automobile
Liability Insurance on a comprehensive form covering all owned, non-owned, and
hired automobiles, trucks, and other vehicles providing the following minimum limits
of liability coverage:
Either(1)a combined single limit of One Million Dollars ($1,000,000) and a general
aggregate limit of One Million Dollars ($1,000,000)for bodily injury, personal injury
and property damage;
Or alternatively, (2) One Million Dollars ($1,000,000) per person for bodily injury and
One Million Dollars ($1,000,000) per accident for property damage.
3. Umbrella Excess Liability: The minimum limits of general liability and automobile
liability insurance required, as set forth above, shall be provided for either in a single
policy of primary insurance or a combination of policies of primary and umbrella
C-CA-071913
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 16 of 25
Return to Aaentle Report
excess coverage. Excess liability coverage shall be issued with limits of liability
which, when combined with the primary insurance, will equal the minimum limits for
general liability and automobile liability.
4. Worker's Compensation/Employer's Liability: CONTRACTOR shall provide such
Worker's Compensation Insurance as required by the Labor Code of the State of
California, including employer's liability with a minimum limit of One Million Dollars
($1,000,000) per accident for bodily injury or disease. If an exposure to Jones Act
liability may exist, the insurance required herein shall include coverage with regard to
Jones Act claims.
Where permitted by law, CONTRACTOR hereby waives all rights of recovery by
subrogation because of deductible clauses, inadequacy of limits of any insurance
policy, limitations or exclusions of coverage, or any other reason against OCSD, its
or their officers, agents, or employees, and any other contractor or subcontractor
performing Work or rendering services on behalf of OCSD in connection with the
planning, development and construction of the Project. In all its insurance coverages
related to the Work, CONTRACTOR shall include clauses providing that each insurer
shall waive all of its rights of recovery by subrogation against OCSD, its or their
officers, agents, or employees, or any other contractor or subcontractor performing
Work or rendering services at the Project. Where permitted by law, CONTRACTOR
shall require similar written express waivers and insurance clauses from each of its
Subcontractors of every tier. A waiver of subrogation shall be effective as to any
individual or entity, even if such individual or entity (a)would otherwise have a duty
of indemnification, contractual or otherwise, (b)did not pay the insurance premium,
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 17 of 25
directly or indirectly, and (c)whether or not such individual or entity has an insurable
interest in the property damaged.
B. Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by OCSD. At
the option of OCSD, either: the Insurer shall reduce or eliminate such deductibles or self-
insured retentions as respects OCSD, its Directors, officers, agents, CONSULTANTS, and
employees; or CONTRACTOR shall provide a financial guarantee satisfactory to OCSD
guaranteeing payment of losses and related investigations, claim administration, and
defense expenses.
C. Other Insurance Provisions
1. Each such policy of General Liability Insurance and Automobile Liability Insurance
shall be endorsed to contain, the following provisions:
a. OCSD, its Directors, officers, agents, CONSULTANTS, and employees, and all
public agencies from whom permits will be obtained, and their Directors,
officers, agents, and employees are hereby declared to be additional insureds
under the terms of this policy, but only with respect to the operations of
CONTRACTOR at or from any of the sites of OCSD in connection with this
Contract, or acts and omissions of the additional insured in connection with its
general supervision or inspection of said operations related to this Contract.
b. Insurance afforded by the additional insured endorsement shall apply as
primary insurance, and other insurance maintained by OCSD shall be excess
only and not contributing with insurance provided under this policy.
2. Each insurance policy required herein shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty (30)days prior written notice by
certified mail, return receipt requested, and that coverage shall not be cancelled for
C-CA-071913
PROJECT NO. P2-10e
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 18 of 25
Return to Aaenda Report
non-payment of premium except after ten (10)days prior written notice by certified
mail, return receipt requested. Should there be changes in coverage or an increase
in deductible or SIR amounts, CONTRACTOR undertakes to procure a manuscript
endorsement from its insurer giving 30 days prior notice of such an event to OCSD,
or to have its insurance broker/agent send to OCSD a certified letter describing the
changes in coverage and any increase in deductible or SIR amounts. The certified
letter must be sent Attention: Risk Management and shall be received not less than
twenty (20) days prior to the effective date of the change(s). The letter must be
signed by a Director or Officer of the broker/agent and must be on company
letterhead, and may be sent via e-mail in pdf format.
3. Coverage shall not extend to any indemnity coverage for the active negligence of
any additional insured in any case where an agreement to indemnify the additional
insured would be invalid under California Civil Code Section 2782(b).
4. If required by a public agency from whom permit(s)will be obtained, each policy of
General Liability Insurance and Automobile Liability Insurance shall be endorsed to
specify by name the public agency and its legislative members, officers, agents,
CONSULTANTS, and employees, to be additional insureds.
D. Acceptability of Insurers
Insurers must have an "A-", or better, Policyholder's Rating, and a Financial Rating of at
least Class VIII, or better, in accordance with the most current A.M. Best Rating Guide.
OCSD recognizes that State Compensation Insurance Fund has withdrawn from
participation in the A.M. Best Rating Guide process. Nevertheless, OCSD will accept
State Compensation Insurance Fund for the required policy of worker's compensation
insurance, subject to OCSD's option, at any time during the term of this Contract, to
require a change in insurer upon twenty (20)days written notice. Further, OCSD will
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 19 of 25
require CONTRACTOR to substitute any insurer whose rating drops below the levels
herein specified. Said substitution shall occur within twenty (20)days of written notice to
CONTRACTOR by OCSD or its agent.
E. Verification of Coverage
CONTRACTOR shall furnish OCSD with original certificates and mandatory endorsements
affecting coverage. Said policies and endorsements shall conform to the requirements
herein stated. All certificates and endorsements are to be received and approved by
OCSD before Work commences. OCSD reserves the right to require complete, certified
copies of all required insurance policies, including endorsements, affecting the coverage
required by these Specifications at any time.
F. Subcontractors
CONTRACTOR shall be responsible to establish insurance requirements for any
Subcontractors hired by CONTRACTOR. The insurance shall be in amounts and types
reasonably sufficient to deal with the risk of loss involving the Subcontractor's operations
and work. OCSD and any public agency issuing permits for the Project must be named as
"Additional Insured"on any General Liability or Automobile Liability policy obtained by a
Subcontractor. The CONTRACTOR must obtain copies and maintain current versions of
all Subcontractors' policies, Certificate of Liability and mandatory endorsements effecting
coverage. Upon request, CONTRACTOR must furnish OCSD with the above referenced
required documents.
G. Required Forms and Endorsements
1. Required ACORD Form
a. Certificate of Liability Form 25-S (7/97)
C-CA-071913
PROJECT NO. P2-10e
BOILER SYSTEM REHABILITATION AND SCRUBBERS H R I DEMOLITION AT PLANT NO.2
CONFORMED
Page 20 of 25
Return to Agenda Report
2. Required Insurance Services Office, Inc. Endorsements (when alternative forms are
shown, they are listed in order of preference)
In the event any of the following forms are cancelled by Insurance Services Office,
Inc. (ISO), or are updated, the ISO replacement form or equivalent must be supplied.
a. Commercial General Liability Form CG-0001 10 01
b. Additional Insured Including Form CG-2010 10 01 and
Products-Completed Operations Form CG-2037 10 01
C. Waiver of Transfer of Rights of Form CG-2404 11 85; or
Recovery Against Others to Us/ Form CG-2404 10 93
Waiver of Subrogation
3. Required State Compensation Insurance Fund Endorsements
a. Waiver of Subrogation Endorsement No. 2570
b. Cancellation Notice Endorsement No. 2065
4. Additional Required Endorsements
a. Notice of Policy Termination Manuscript Endorsement
SECTION-17 RISK AND INDEMNIFICATION
All Work covered by this Contract done at the site of construction or in preparing or delivering
materials to the site shall be at the risk of CONTRACTOR alone. CONTRACTOR shall save,
indemnify, defend, and keep OCSD and others harmless as more specifically set forth in
General Conditions, "General Indemnification".
SECTION-18 TERMINATION
This Contract may be terminated in whole or in part in writing by OCSD in the event of
substantial failure by the CONTRACTOR to fulfill its obligations under this Agreement, or it may
be terminated by OCSD for its convenience provided that such termination is effectuated in a
manner and upon such conditions set forth more particularly in General Conditions,
"Termination for Default" and/or"Termination for Convenience", provided that no termination
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 21 of 25
may be effected unless proper notice is provided to CONTRACTOR at the time and in the
manner provided in said General Conditions. If termination for default or convenience is
effected by OCSD, an equitable adjustment in the price provided for in this Contract shall be
made at the time and in the manner provided in the General Conditions, "Termination for
Default" and "Termination for Convenience".
SECTION-19 WARRANTY
The CONTRACTOR agrees to perform all Work under this Contract in accordance with the
Contract Documents, including OCSD's designs, Drawings and Specifications.
The CONTRACTOR guarantees for a period of at least one (1) year from the date of Final
Acceptance of the Work, pursuant to the General Conditions, "Final Acceptance and Final
Completion" that the completed Work is free from all defects due to faulty materials, equipment
or workmanship and that it shall promptly make whatever adjustments or corrections which may
be necessary to cure any defects, including repairs of any damage to other parts of the system
resulting from such defects. OCSD shall promptly give notice to the CONTRACTOR of
observed defects. In the event that the CONTRACTOR fails to make adjustments, repairs,
corrections or other work made necessary by such defects, OCSD may do so and charge the
CONTRACTOR the cost incurred. The CONTRACTOR's warranty shall continue as to any
corrected deficiency until the later of(1)the remainder of the original one-year warranty period;
or(2)one year after acceptance by OCSD of the corrected Work. The Performance Bond and
the Payment Bond shall remain in full force and effect through the guarantee period.
The CONTRACTOR's obligations under this clause are in addition to the CONTRACTOR's
other express or implied assurances under this Contract, including but not limited to specific
manufacturer or other extended warranties specified in the Plans and Specifications, or state
C-CA-071913
PROJECT NO. P2-10e
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 22 of 25
Return to Aaende Report
law and in no way diminish any other rights that OCSD may have against the CONTRACTOR
for faulty materials, equipment or Work.
SECTION-20 ASSIGNMENT
No assignment by the CONTRACTOR of this Contract or any part hereof, or of funds to be
received hereunder, will be recognized by OCSD unless such assignment has had prior written
approval and consent of OCSD and the Surety.
SECTION — 21 RESOLUTION OF DISPUTES
OCSD and the CONTRACTOR shall comply with the provisions of California Public Contract
Code Section 20104 at. seq., regarding resolution of construction claims for any Claims which
arise between the CONTRACTOR and OCSD, as well as all applicable dispute and Claims
provisions as set forth in the General Conditions and as otherwise required by law.
SECTION—22 SAFETY & HEALTH
CONTRACTOR shall comply with all applicable safety and health requirements mandated by
federal, state, city and/or public agency codes, permits, ordinances, regulations, and laws, as
well as these Contract Documents, including but not limited to the General Requirements,
Section entitled "Safety" and Exhibit B OCSD Safety Standards.
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 23 of 25
SECTION-23 NOTICES
Any notice required or permitted under this Contract may be given by ordinary mail at the
address set forth below. Any party whose address changes shall notify the other party in
writing.
TO OCSD: Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Attn: Clerk of the Board
Copy to: Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Attn: Construction Manager
Bradley R. Hogin, Esquire
Woodruff, Spradlin &Smart
555 Anton Boulevard
Suite 1200
Costa Mesa, California 92626
TO CONTRACTOR: Irwin Industries
1580 West Carson Street
Long Beach, CA 90810
Copy to: Quinton Karst, President
Irwin Industries
1580 West Carson Street
Long Beach, CA 90810
C-CA-071913
PROJECT NO. P2-10e
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 24 of 25
Return to Aaende Report
IN WITNESS WHEREOF, the parties hereto have executed this Contract Agreement as the
date first hereinabove written.
CONTRACTOR: Irwin Industries
1580 West Carson Street
Long Beach, CA 90810
By
Printed Name
Its
CONTRACTOR's State License No. 429593 (Expiration Date— 10/3112014)
OCSD: Orange County Sanitation District
By
Chair, Board of Directors
By
Clerk of the Board
By
Contracts, Purchasing and Materials
Management Division Manager
C-CA-071913
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 25 of 25
EXHIBIT A
SCHEDULE OF PRICES
C-EXA-071012
Return to Aaenda Report
TABLE OF CONTENTS
EXHIBIT A
SCHEDULE OF PRICES
EXA-1 BASIS OF COMPENSATION ..............................................................................1
EXA-2 PROGRESS PAYMENTS....................................................................................1
EXA-3 RETENTION AND ESCROW ACCOUNTS .........................................................1
EXA-4 STOP PAYMENT NOTICE ..................................................................................3
EXA-5 PAYMENT TO SUBCONTRACTORS..................................................................3
EXA-6 PAYMENT OF TAXES.........................................................................................3
EXA-7 FINAL PAYMENT ................................................................................................4
EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT.....5
ATTACHMENT 1 CERTIFICATION FOR REQUEST FOR PAYMENT........................7
ATTACHMENT 2 SCHEDULE OF PRICES ...........................................................8
C-EXA-071012
EXHIBIT A
SCHEDULE OF PRICES
EXA-1 BASIS OF COMPENSATION
CONTRACTOR will be paid the Contract Price according to the Schedule of
Prices, and all other applicable terms and conditions of the Contract
Documents.
EXA-2 PROGRESS PAYMENTS
Progress payments will be made in accordance with all applicable terms and
conditions of the Contract Documents, including, but not limited to:
1. Contract Agreement—Section 11 —"Contract Price and Method of
Payment;"
2. General Conditions—"Payment—General";
3. General Conditions—"Payment—Applications for Payment";
4. General Conditions—"Payment— Mobilization Payment Requirements;"
5. General Conditions—"Payment— Itemized Breakdown of Contract Lump
Sum Prices";
6. General Conditions—"Contract Price Adjustments and Payments";
7. General Conditions—"Suspension of Payments";
8. General Conditions—"OCSD's Right to Withhold Certain Amounts and
Make Application Thereof"; and
9. General Conditions—"Final Payment."
EXA-3 RETENTION AND ESCROW ACCOUNTS
A. Retention:
OCSD shall retain a percentage of each progress payment to assure
satisfactory completion of the Work. The amount to be retained from each
progress payment shall be determined as provided in General Conditions—
"Retained Funds; Substitution of Securities". In all contracts between
CONTRACTOR and its Subcontractors and/or Suppliers, the retention may not
exceed the percentage specified in the Contract Documents.
C-EXA-071012
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 1 of 8
Return to Aaenda Report
B. Substitution of Securities:
CONTRACTOR may, at its sole expense, substitute securities as provided in
General Conditions—"Retained Funds; Substitution of Securities." Payment of
Escrow Agent:
In lieu of substitution of securities as provided above, the CONTRACTOR may
request and OCSD shall make payment of retention earned directly to the
escrow agent at the expense of the CONTRACTOR. At the expense of the
CONTRACTOR, the CONTRACTOR may direct the investment of the
payments into securities consistent with Government Code §16430 and the
CONTRACTOR shall receive the interest earned on the investments upon the
same terms provided for in this article for securities deposited by the
CONTRACTOR. Upon satisfactory completion of the Contract, the
CONTRACTOR shall receive from the escrow agent all securities, interest and
payments received by the escrow agent from OCSD, pursuant to the terms of
this article. The CONTRACTOR shall pay to each Subcontractor, not later than
twenty (20)calendar days after receipt of the payment, the respective amount
of interest earned, net of costs attributed to retention withheld from each
Subcontractor, on the amount of retention withheld to ensure the performance
of the Subcontractor. The escrow agreement used by the escrow agent
pursuant to this article shall be substantially similar to the form set forth in
§22300 of the California Public Contract Code.
C. Release of Retention:
Upon Final Acceptance of the Work, the CONTRACTOR shall submit an
invoice for release of retention in accordance with the terms of the Contract.
D. Additional Deductibles:
In addition to the retentions described above, OCSD may deduct from each
progress payment any or all of the following:
1. Liquidated Damages that have occurred as of the date of the application for
progress payment;
2. Deductions from previous progress payments already paid, due to OCSD's
discovery of deficiencies in the Work or non-compliance with the
Specifications or any other requirement of the Contract;
3. Sums expended by OCSD in performing any of the CONTRACTOR'S
obligations under the Contract that the CONTRACTOR has failed to
perform, and;
4. Other sums that OCSD is entitled to recover from the CONTRACTOR
under the terms of the Contract, including without limitation insurance
deductibles and assessments.
C-EXA-071012
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 2 of 8
The failure of OCSD to deduct any of the above-identified sums from a
progress payment shall not constitute a waiver of OCSD's right to such sums or
to deduct them from a later progress payment.
EXA-4 STOP PAYMENT NOTICE
In addition to other amounts properly withheld under this article or under other
provisions of the Contract, OCSD shall retain from progress payments
otherwise due the CONTRACTOR an amount equal to one hundred twenty-five
percent (125%)of the amount claimed under any stop payment notice under
Civil Code§9350 at. seq. or other lien filed against the CONTRACTOR for
labor, materials, supplies, equipment, and any other thing of value claimed to
have been furnished to and/or incorporated into the Work; or for any other
alleged contribution thereto. In addition to the foregoing and in accordance with
Civil Code§9358 OCSD may also satisfy its duty to withhold funds for stop
payment notices by refusing to release funds held in escrow pursuant to public
receipt of a release of stop payment notice executed by a stop payment notice
claimant, a stop payment notice release bond, an order of a court of competent
jurisdiction, or other evidence satisfactory to OCSD that the CONTRACTOR
has resolved such claim by settlement.
EXA-5 PAYMENT TO SUBCONTRACTORS
Requirements
1. The CONTRACTOR shall pay all Subcontractors for and on account of
Work performed by such Subcontractors, not later than seven (7) days after
receipt of each progress payment as required by the California Business
and Professions Code §7108.5. Such payments to Subcontractors shall be
based on the measurements and estimates made pursuant to article
progress payments provided herein.
2. Except as specifically provided by law, the CONTRACTOR shall pay all
Subcontractors any and all retention due and owing for and on account of
Work performed by such Subcontractors not later than seven (7)days after
CONTRACTOR'S receipt of said retention proceeds from OCSD as
required by the California Public Contract Code§7107.
EXA-6 PAYMENT OF TAXES
Unless otherwise specifically provided in this Contract, the Contract Price
includes full compensation to the CONTRACTOR for all taxes. The
CONTRACTOR shall pay all federal, state, and local taxes, and duties
applicable to and assessable against any Work, including but not limited to
retail sales and use, transportation, export, import, business, and special taxes.
The CONTRACTOR shall ascertain and pay the taxes when due. The
CONTRACTOR will maintain auditable records, subject to OCSD reviews,
confirming that tax payments are current at all times.
C-EXA-071012
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 3 of 8
Return to Aaenda Report
EXA-7 FINAL PAYMENT
After Final Acceptance of the Work, as more particularly set forth in the
General Conditions, "Final Acceptance and Final Completion", and after
Resolution of the Board authorizing final payment and satisfaction of the
requirements as more particularly set forth in General Conditions—"Final
Payment", a final payment will be made as follows:
1. Prior to Final Acceptance, the CONTRACTOR shall prepare and submit an
application for Final Payment to OCSD, including:
a. The proposed total amount due the CONTRACTOR, segregated by
items on the payment schedule, amendments, Change Orders, and
other bases for payment;
b. Deductions for prior progress payments;
c. Amounts retained;
d. A conditional waiver and release on final payment for each
Subcontractor(per Civil Code Section 8136);
e. A conditional waiver and release on final payment on behalf of the
CONTRACTOR (per Civil Code Section 8136);
f. List of Claims the CONTRACTOR intends to file at that time or a
statement that no Claims will be filed,
g. List of pending unsettled claims, stating claimed amounts, and copies of
any and all complaints and/or demands for arbitration received by the
CONTRACTOR; and
h. For each and every claim that resulted in litigation or arbitration which
the CONTRACTOR has settled, a conformed copy of the Request for
Dismissal with prejudice or other satisfactory evidence the arbitration is
resolved.
2. The application for Final Payment shall include complete and legally
effective releases or waivers of liens and stop payment notices satisfactory
to OCSD, arising out of or fled in connection with the Work. Prior progress
payments shall be subject to correction in OCSD's review of the application
for Final Payment. Claims filed with the application for Final Payment must
be otherwise timely under the Contract and applicable law.
3. Within a reasonable time, OCSD will review the CONTRACTOR'S
application for Final Payment. Any recommended changes or corrections
will then be forwarded to the CONTRACTOR. Within ten (10) calendar days
after receipt of recommended changes from OCSD, the CONTRACTOR will
make the changes, or list Claims that will be filed as a result of the
changes, and shall submit the revised application for Final Payment. Upon
C-EXA-071012
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 4 of 8
acceptance by OCSD, the revised application for Final Payment will
become the approved application for Final Payment.
4. If no Claims have been fled with the initial or any revised application for
Final Payment, and no Claims remain unsettled within thirty (30) calendar
days after Final Acceptance of the Work by OCSD, and agreements are
reached on all issues regarding the application for Final Payment, OCSD,
in exchange for an executed release, satisfactory in form and substance to
OCSD, will pay the entire sum found due on the approved application for
Final Payment, including the amount, if any, allowed on settled Claims.
5. The release from the CONTRACTOR shall be from any and all Claims
arising under the Contract, except for Claims that with the concurrence of
OCSD are specifically reserved, and shall release and waive all unreserved
Claims against OCSD and its officers, directors, employees and authorized
representatives. The release shall be accompanied by a certification by the
CONTRACTOR that:
a. It has resolved all Subcontractors, Suppliers and other Claims that are
related to the settled Claims included in the Final Payment;
b. It has no reason to believe that any party has a valid claim against the
CONTRACTOR or OCSD which has not been communicated in writing
by the CONTRACTOR to OCSD as of the date of the certificate;
c. All warranties are in full force and effect, and;
d. The releases and the warranties shall survive Final Payment.
6. If any claims remain open, OCSD may make Final Payment subject to
resolution of those claims. OCSD may withhold from the Final Payment an
amount not to exceed one hundred fifty percent (150%)of the sum of the
amounts of the open claims, and one hundred twenty-five percent (125%)
of the amounts of open stop payment notices referred to in article entitled
stop payment notices herein.
7. The CONTRACTOR shall provide an unconditional waiver and release on
final payment from each Subcontractor and Supplier providing Work under
the Contract(per Civil Code Section 8138) and an unconditional waiver and
release on final payment on behalf of the CONTRACTOR (per Civil Code
Section 8138)within thirty (30)days of receipt of Final Payment.
EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT
Notwithstanding OCSD's acceptance of the application for Final Payment and
irrespective of whether it is before or after Final Payment has been made,
OCSD shall not be precluded from subsequently showing that:
1. The true and correct amount payable for the Work is different from that
previously accepted;
C-EXA-071012
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 5 of 8
Return to Aaenda Report
2. The previously-accepted Work did not in fact conform to the Contract
requirements, or;
3. A previous payment or portion thereof for Work was improperly made.
OCSD also shall not be stopped from demanding and recovering damages
from the CONTRACTOR, as appropriate, under any of the foregoing
circumstances as permitted under the Contract or applicable law.
C-EXA-071012
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 6 of 8
ATTACHMENTI
CERTIFICATION FOR REQUEST FOR PAYMENT
I hereby certify under penalty of perjury as follows:
That the claim for payment is in all respects true, correct; that the services mentioned
herein were actually rendered and/or supplies delivered to OCSD in accordance with the
Contract.
I understand that it is a violation of both the federal and California False Claims Acts to
knowingly present or cause to be presented to OCSD a false claim for payment or
approval.
A claim includes a demand or request for money. It is also a violation of the False
Claims Acts to knowingly make use of a false record or statement to get a false claim
paid. The term "knowingly" includes either actual knowledge of the information,
deliberate ignorance of the truth or falsity of the information, or reckless disregard for the
truth or falsity of the information. Proof of specific intent to defraud is not necessary
under the False Claims Acts. I understand that the penalties under the Federal False
Claims Act and State of California False Claims Act are non-exclusive, and are in
addition to any other remedies which OCSD may have either under contract or law.
I hereby further certify, to the best of my knowledge and belief, that:
1. The amounts requested are only for performance in accordance with the
Specifications, terms, and conditions of the Contract;
2. Payments to Subcontractors and Suppliers have been made from previous payments
received under the Contract, and timely payments will be made from the proceeds of
the payment covered by this certification;
3. This request for progress payments does not include any amounts which the prime
CONTRACTOR intends to withhold or retain from a Subcontractor or Supplier in
accordance with the terms and conditions of the subcontract; and
4. This certification is not to be construed as Final Acceptance of a Subcontractor's
performance.
Name
Title
Date
C-EXA-071012
PROJECT NO. P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 7 of 8
Return to Aaenda Report
ATTACHMENT
SCHEDULE OF PRICES
See next pages for Bid Submittal Forms (Irwin Industries):
BF-14 Schedule of Prices, Pages 26-27
C-EXA-071012
PROJECT NO.P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H&I DEMOLITION AT PLANT NO.2
CONFORMED
Page 8 of 8
Bid Submitted By: Irwin Industries
(Name of Firm)
BF-14 SCHEDULE OF PRICES
INSTRUCTIONS
A. General
-. Furlloft.P_uces,itisundemtoodthaUhefollowing-quantifies.are.approximateonly-end-ar - -
solely for the purpose of estimating the comparlson of Bids, and that the actual value of work
will be computed based upon the actual quantities in the completed Work,whether they be
more or less than those shown. CONTRACTOR's compensation for the Work under the
Contract Documents will be computed based upon the lump sum amount of the Contract at
time of award, plus any additional or deleted costs approved by OCSD via approved Change
Orders, pursuant to the Contract Documents.
Bidder shall separately pdco and accurately reflect costs associated with each line item,
leaving no blanks. Any and all modifications to the Bid must be initialed by an authorized
representative of the Bidder in accordance with the Instructions to Bidders, Preparation of Bid
Bidders are reminded of Instruction to Bidders, Discrepancy in Bid Items,which,in summary,
provides that the total price for each Item shall be based on the Unit Pdco listed for each item
multiplied by the quantity; and the correct Total Prim for each item shall be totaled to
determine the Total Amount of Bid.
All applicable costs including overhead and profit shall be reflected in the respective unit costs
and the TOTAL AMOUNT OF BID. The Bid price shall Include all costs to complete the Work,
including profit, overhead. etc.,unless otherwise specified in the Contract Documents. All
aoglkable sales taxes state and/or federal and any other special taxes patent rights or
royalties shall be included in the prices quoted in this Bid.
B. Basis of Award
AWARD OF THE CONTRACT WILL BE MADE ON THE BASIS OF THE LOWEST
RESPONSIVE AND RESPONSIBLE BID. THE LOWEST BID IS DEFINED AS THE"TOTAL
AMOUNT OF BID'LISTED IN THIS BID, UNLESS OTHERWISE SPECIFIED BELOW.
Note 1: Base Bid. Includes all costs necessary to fumish all labor, materials,equipment and
services for the construction of the Project per the Contract Documents.
G-BF-041013
PROJECT NO,P2-106
BOILER SYSTEM REHABILITATION AND SCRUBBERS H 81 DEMOLITION AT PLANT NO.2
Page 26 of 27
` Return b Mends Repod
Bid Submitted By: Irvin Industries
(Name of Firm)
EXHIBIT A
SCHEDULE OF PRICES
Refer to Note 1 in the Instructions:
Item Approx. Item Unit Total
No. Oty. Price Price
1. Lump Mobilization in accordance vdth General Conditions,
Sum Payment-Mobilization Payment Requirements,for
the lump sum price of... L.S. $ 50,000.00
2. Lump Furnish all labor,materials,and equipment and
Sum services,except for Item No. 1 above for the
construction of, PROJECT NO. P2-106, BOILER
SYSTEM REHABILITATION AND SCRUBBERS H&I
DEMOLITION AT PLANT NO.2,for the lump sum
price of... L.S. $ 1,422,993.00
TOTAL AMOUNT OF BID(BASIS OF AWARD) $ 1,472,993.00
�...
PROJECT NO.122-100
NO.2
BOILER SYSTEM REHABILITATION AND SCRUBBERS H 81 DEMOLITION AT PLANT N0.2
Page 27 cf 27
BOARD OF DIRECTORS Meeting Dare Toel Dir.
— ro/zs/is
AGENDA REPORT em Number Item Numbe
a
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Kanetis, Director of Engineering
Project Manager: Daisy Covarrubias
SUBJECT: PROPOSED DETACHMENT NO. DD13-10— LAGUNA WOODS
DETACHMENT
GENERAL MANAGER'S RECOMMENDATION
A. Authorize staff to detach 171.55 acres from the Orange County Sanitation District
in the vicinity of Laguna Canyon Road, within the City of Laguna Woods; and,
B. Adopt Resolution No. OCSD 13-15, authorizing initiation of proceedings to
detach said territories from the Orange County Sanitation District service area
(Proposed Detachment No. DID 13-10— Laguna Woods Detachment).
SUMMARY
Staff is requesting to detach an area totaling 171.55 acres from the Orange County
Sanitation District (OCSD) service boundary. The area, formally an unincorporated
county area known as Laguna Laurel, was annexed to the City of Laguna Woods in
April 2008. This action is to correct an oversight in the original boundary movement.
The City boundary was moved and the Sanitation District boundary was not considered
at that time.
Per the City of Laguna Woods General Plan, the entirety of the area has been
designated open space which is consistent with a conservation easement recorded in
December of 2001 by the previous land owner, the Irvine Company. The land is
currently owned by the County of Orange. Development in this area will be limited to
the provisions of the conservation easement and include minor construction such as
fences, gates, and information signs.
The detachment of this area from OCSD service boundary will not financially impact
OCSD or the property owners or disrupt service in any way. Irvine Ranch Water District
(IRWD) is the regional sewer service provider and local sewer service is provided by the
City of Laguna Woods.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
Page 1 of 2
ADDITIONAL INFORMATION
Health and Safety Code Section 4730.65 states that each city located wholly or partially
within OCSD's boundary shall have representation by a council member on OCSD's
Board.
The code does not specify if it pertains to only those cities within OCSD's boundary at
the time Section 4730.65 was adopted in 1997, or if it pertains to cities within OCSD's
boundary at any given time. If one interprets the statute to mean the latter, the City of
Laguna Woods may be entitled to representation on OCSD's Board.
CEQA
The recommended action is statutorily exempt from the California Environmental Quality
Act under Public Resource Code Sections 15060 and 15378 because the action will not
result in a direct or reasonably foreseeable indirect physical change in the environment
and categorically exempt under Title 2 of the California Code of Regulations, section
15319, pertaining to annexations of existing facilities and lots of exempt facilities.
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
N/A
ATTACHMENTS
The following attachment(s) are attached in hard copy and may also be viewed on-line at the OCSD
website(www.ocsd.com) with the complete agenda package:
1. Resolution No. OCSD 13-15
2. Exhibit "A"
3. Exhibit "B"
DC:sa:gc
Page 2 of 2
Return to Mende Report
RESOLUTION NO. OCSD 13-15
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
ORANGE COUNTY SANITATION DISTRICT, AUTHORIZING
INITIATION OF CHANGE OR ORGANIZATION PROCEEDINGS
AND FILING OF APPLICATION TO THE ORANGE COUNTY
LOCAL AGENCY FORMATION COMMISSION TO INITIATE
PROCEEDINGS AND TAKE ALL ACTIONS NECESSARY FOR
THE DETACHMENT OF TERRITORY KNOWN AS DETACHMENT
NO. DD13-10 - LAGUNA WOODS DETACHMENT FROM THE
ORANGE COUNTY SANITATION DISTRICT
WHEREAS, the Orange County Sanitation District ("District") is a duly organized
County Sanitation District existing pursuant to the County Sanitation District Act,
California Health and Safety Code section 4700, at seq., providing for the ownership,
operation, and maintenance of wastewater collection, treatment, and disposal facilities
within Orange County, California; and
WHEREAS, an area totaling approximately 171.55 acres of territory from
Revenue Area 14 of the District in the vicinity of Laguna Canyon Road within the City of
Laguna Woods is currently within the District's service area, the boundaries of which are
more particularly described in Exhibit "A" and delineated in Exhibit "B", attached hereto
and by reference made a part of this Resolution ("Detachment Areas"); and
WHEREAS, the District desires to terminate regional sanitary sewer service to
said Detachment Areas; and
WHEREAS, regional sanitary sewer service to the Detachment Areas is currently
provided by Irvine Ranch Water District ("IRWD"); and
WHEREAS, the territory to be detached that is located in the City of Laguna
Woods is uninhabited; and
WHEREAS, the District desires to initiate Local Agency Formation Commission
("LAFCO") proceedings with the goal of detaching the Detachment Areas from the
District; and
WHEREAS, The District has taken all necessary actions to prepare the LAFCO
application for detachment of the Detachment Areas.
OCSD-13-15-1
Return to Mende Report
NOW, THEREFORE, the Board of Directors of the Orange County Sanitation
District DOES HEREBY RESOLVE, DETERMINE, AND ORDER:
Section 1. That pursuant to Government Code section 56650 at seq., this
resolution of application of the Board of Directors of the District is authorized and
initiated for a detachment of territory proceeding, and accordingly, the Orange County
Local Agency Formation Commission is hereby requested to initiate and take all actions
necessary to detach territory designated as "Detachment No. DO 13-10 — Laguna
Woods Detachment from the Orange County Sanitation District" in the City of Laguna
Woods, the boundaries of which are more particularly described in Exhibit "A" and
delineated in Exhibit "B", attached hereto and by reference made a part of this
Resolution, in the manner provided by the Cortese-Knox Local Government
Reorganization Act of 1985, Government Code sections 56000 et seq.
Section 2. That this proposal is made pursuant to the Cortese-Knox Local
Government Reorganization Act of 1985, Division 3, commencing with Section 56000 of
the California Government Code.
Section 3. That this proposal is for the purpose of detaching one area totaling
approximately 171.55 acres of territory from Revenue Area 14 of the District in the
vicinity of Laguna Canyon Road within the City of Laguna Woods to terminate regional
sanitary sewer service to said Detachment Areas, which said service is provided by
Irvine Ranch Water District.
Section 5. That a portion of the Detachment Area located in the City of Laguna
Woods is uninhabited.
PASSED AND ADOPTED at a regular meeting of the Board of Directors held
October 23. 2013.
Troy Edgar
Chairman of the Board
ATTEST:
Maria E. Ayala
Clerk of the Board
OCSD-13-15-2
Return to Aaenda Report
EXHIBIT "A"
LAGUNA WOODS DETACHMENT FROM
ORANGE COUNTY SANITATION DISTRICT ( DD 13-10 )
1 PARCEL A:
2
3 THOSE PORTIONS OF BLOCKS 158, 169 AND 170 OF THE IRVINE'S SUBDIVISION,
4 IN THE CITY OF LAGUNA WOODS, COUNTY OF ORANGE, STATE OF CALIFORNIA, PER
5 MAP FILED IN BOOK 1, PAGE 88 OF MISCELLANEOUS RECORD MAPS, IN THE
6 OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, AS DESCRIBED IN A "GRANT
7 DEED OF CONSERVATION EASEMENT" RECORDED DECEMBER 18, 2001 AS INSTRUMENT
8 NO. 20010923211, AND IN A "CERTIFICATE OF COMPLETION" OF THE LAGUNA
9 LAUREL REORGANIZATION TO THE CITY OF LAGUNA WOODS (RO 07-27) RECORDED
10 MAY 9, 2008 AS INSTRUMENT NO. 2008000222302, ALL OF OFFICIAL RECORDS IN
11 SAID OFFICE OF THE COUNTY RECORDER, DESCRIBED AS FOLLOWS:
12
13 BEGINNING AT THE EXISTING COMMON CORNER OF THE CITY OF IRVINE AND THE
14 CITY OF LAGUNA WOODS DESCRIBED AS THE NORTHEASTERLY TERMINUS OF THAT
15 CERTAIN COURSE HAVING A BEARING AND DISTANCE OF "SOUTH 31`57'48" WEST,
16 1973.77 FEET" IN SAID LAGUNA LAUREL REORGANIZATION TO THE CITY OF
17 LAGUNA WOODS (RO 07-27) AND SAID "GRANT DEED OF CONSERVATION EASEMENT";
18
19 THENCE, ALONG THE BOUNDARY OF SAID LAGUNA LAUREL REORGANIZATION TO THE
20 CITY OF LAGUNA WOODS (RO 07-27) AND SAID "GRANT DEED OF CONSERVATION
21 EASEMENT", THE FOLLOWING COURSES:
22
23 SOUTH 31°57'48" WEST, 1973.77 FEET;
24
25 SOUTH 50'11'54" WEST, 1153.49 FEET TO THE EXISTING COMMON
26 BOUNDARY OF SAID CITY OF LAGUNA WOODS AND SAID COUNTY OF ORANGE
27 AS CREATED BY SAID LAGUNA LAUREL REORGANIZATION TO THE CITY OF
28 LAGUNA WOODS (RO 07-27) ;
29
30 THENCE, ALONG SAID EXISTING COMMON BOUNDARY OF THE CITY OF LAGUNA WOODS
31 AND THE COUNTY OF ORANGE AND CONTINUING ALONG SAID BOUNDARY OF `GRANT
32 DEED OF CONSERVATION EASEMENT", THE FOLLOWING COURSES:
33
34 NORTH 39"48'06" WEST, 686.81 FEET;
35
36 NORTH 31°39'01" WEST, 542.54 FEET;
37
38 NORTH 59°12'39" EAST, 1.12 FEET;
39
40 NORTH 65`23'28" WEST, 295.13 FEET;
41
42 NORTH 24"37'12" EAST, 316.56 FEET TO THE BEGINNING OF A CURVE
43 CONCAVE NORTHWESTERLY HAVING A RADIUS OF 2425.00 FEET;
44
45 NORTHEASTERLY 613.11 FEET ALONG SAID CURVE THROUGH A CENTRAL
46 ANGLE OF 14°29'10";
47
48 NORTH 10*08'02" EAST, 5.50 FEET;
49
50 NORTH 64'29' 40" EAST, 53.49 FEET;
51
52 NORTH 33'04'22" EAST, 110.76 FEET;
53
54 NORTH 12'01'54" EAST, 94.27 FEET;
55
Page 1 of 3
Rd,,.l A tl R d
EXHIBIT "A"
LAGUNA WOODS DETACHMENT FROM
ORANGE COUNTY SANITATION DISTRICT ( DD 13-10 )
1 NORTH 01'12'37" WEST, 80.66 FEET;
2
3 NORTH 07'08'15" WEST, 51.27 FEET;
4
5 NORTH 14°41'56" EAST, 38.33 FEET;
6
7 NORTH 32°53'57" EAST, 132.13 FEET;
8
9 NORTH 57°00'02" EAST, 24.21 FEET;
10
11 NORTH 11'03'01" WEST, 67.41 FEET;
12
13 NORTH 64'51'29" WEST, 21.84 FEET;
14
15 NORTH 32"36' 46" WEST, 33.54 FEET;
16
17 NORTH 40°1W 35" WEST, 51.80 FEET;
18
19 NORTH 02°12' 56" EAST, 44.23 FEET;
20
21 NORTH 21'37'46" EAST, 341.52 FEET;
22
23 NORTH 16'50'22" WEST, 159.16 FEET;
24
25 NORTH 77'20' 44" WEST, 18.54 FEET TO A NON-TANGENT CURVE CONCAVE
26 WESTERLY HAVING A RADIUS OF 2039.46 FEET AND TO WHICH A RADIAL
27 LINE BEARS SOUTH 77*20144" EAST;
28
29 NORTHERLY 1685.17 FEET ALONG SAID CURVE THROUGH A CENTRAL ANGLE
30 OF 47'20'33" TO THE EXISTING COMMON BOUNDARY OF SAID CITY OF
31 LAGUNA WOODS AND SAID CITY OF IRVINE AS CREATED BY SAID LAGUNA
32 LAUREL REORGANIZATION TO THE CITY OF LAGUNA WOODS (RO 07-27) AND
33 TO WHICH A RADIAL LINE BEARS NORTH 55°18143" EAST;
34
35 THENCE, ALONG SAID EXISTING COMMON BOUNDARY OF THE CITY OF LAGUNA WOODS
36 AND THE CITY OF IRVINE AND CONTINUING ALONG SAID BOUNDARY OF -GRANT
37 DEED OF CONSERVATION EASEMENT", THE FOLLOWING COURSES:
38
39 NORTH 65"28'35" EAST, 1137.05 FEET;
40
41 SOUTH 35°32.15" EAST, 430.15 FEET;
42
43 SOUTH 16°23'44" WEST, 686.21 FEET;
44
45 SOUTH 51°21'30" EAST, 640.34 FEET;
46
47 SOUTH 21'02'44" EAST, 696.43 FEET;
48
49 SOUTH 58'41'43" EAST, 1093.62 FEET TO THE POINT OF BEGINNING.
50
51
52 CONTAINING AN AREA OF 171.55 ACRES, MORE OR LESS.
53
54
Page 2 of 3
Return to Aaenda Report
EXHIBIT "A"
IAGUNA WOODS DETACHMENT FROM
ORANGE COUNTY SANITATION DISTRICT ( DD 13-10 )
1 ALSO AS SHOWN ON EXHIBIT "B" ATTACHED HERETO AND BY THIS REFERENCE MADE
2 A PART HEREOF.
3
4
5 THIS DOCUMENT WAS PREPARED BY ME OR
6 UNDER MY DIRECTION. �pNAL
O
8 DATED THIS ���44,SDAY OF 2013. ap�� O•SrE SG9�
9 * kaK
10
11 y�
12 JAMES 0. STEINES, P.L.S. 6086 9A
13 REGISTRATION EXPIRES 12/31/13
14 CALIFOP
15
16
17
18 THIS DESCRIPTION AND MAP OF PROPOSED
19 DETACHMENT DOES MEET THE APPROVAL OF
20 THE
ORAN GOUNTY SURVEYOR'S OFFICE.
21
22 0YDA OQ
LAND
29 W Og'` fa,_9g`
24 XEVIN R. HILLS, COUNTY SURVEYOR O�
25 L.S. 6617, EXPIRATION DATE: 12/31/13 � Oy
227
6
28
IIa Mai
29 BY: WEHRM�CHIEF PU SURVEYOR .yjfi pQP�
30 S PC
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
Page 3 of 3
F)Q.W IV.
LAGUNA WOODS DETACt NT FROM
ORANGE COMITY SAWATIOIN DISTRIOT ( OD 13-10 )
gy�4 �� sf § sv � _ A/. mrvuew xcmi
PM MA
tq2 JN e
r'
HGE
s aRllla wont 5w Aa MMT s AMK cSrPoCT `"614e
� I m,swo/ .art..�eu.r a anoe "•°°°
ITEM NO. 5
MINUTES
STEERING COMMITTEE MEETING
Orange County Sanitation District
The Steering Committee meeting convened on Wednesday, September 25, 2013,
at 5:30 p.m. in the Administration Building of the Orange County Sanitation
District.
A quorum was declared present, as follows:
COMMITTEE MEMBERS STAFF PRESENT
PRESENT: Jim Herberg, General Manager
John Anderson, Vice-Chair Bob Ghirelli, Assistant General
Tom Beamish, Operations Committee Manager
Chair Nick Arhontes, Director of Facilities
Brad Reese, Administration Committee Support Services
Chair Nick Kanetis, Director of Engineering
John Nielsen Jeff Reed, Director of Human
John Withers Resources
Ed Torres, Director of Operations &
COMMITTEE MEMBERS ABSENT: Maintenance
Troy Edgar, Chair Lorenzo Tyner, Director of Finance &
Administrative Services
Maria Ayala, Clerk of the Board
Janine Aguilar
Jim Colston
Norbert Gaia
Andrew Nau
Rich Spencer
OTHERS PRESENT:
Brad Hogin, General Counsel
Jim Ruth, Consultant
PUBLIC COMMENTS:
None.
COMMITTEE CHAIR REPORT:
Vice-Chair Anderson briefly reported on the recent OCSD VIP (Volunteer Incentive
Program) Event.
Minutes of the Steering Committee
September 25,2013
Page 2 of 3
GENERAL MANAGER REPORT:
General Manager, Jim Herberg, reported that he and Chair Edgar presented at
WACO, and also reported on the recent media attention to the What 2 Flush
campaign.
Mr. Herberg reported on the following from his monthly report: Lorenzo Tyner
presenting at the OCERS Directors' meeting; Nick Kanetis presenting at the
WACO Committee meeting; and an update on the recent chemical fire near the
Santa Ana River.
He reminded the Committee about the upcoming GWRS Committee meeting on
Monday at 5 p.m.; and the second Board workshop on October 2.
CONSENT CALENDAR:
1. MOVED, SECONDED, AND DULY CARRIED: Approve Minutes of the
August 28, 2013 Steering Committee Meeting.
ACTION ITEMS:
None.
INFORMATION ITEMS:
2. SAWPA Remedial Plan Update
Jim Colston, Environmental Compliance and Regulatory Affairs Manager,
and Mark Kawamoto, Engineer, gave an update on the SAWPA Remedial
Plan.
CLOSED SESSION
CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE
SECTIONS: 54956.9(d)(1), 54956.9(d)(4), and 54957.6.
The Committee convened in closed session at 5:51 p.m. to discuss seven items.
Confidential Minutes of the closed Session have been prepared in accordance
with the above Government Code Sections and are maintained by the Clerk of the
Board in the Official Book of Confidential Minutes of Board and Committee Closed
Meetings.
Minutes of the Steering Committee
September 25, 2013
Page 3 of 3
RECONVENE IN REGULAR SESSION: The Committee reconvened in regular
session at 6:24 p.m.
CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN
CLOSED SESSION:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA
ITEMS, IF ANY:
None.
ADJOURNMENT:
The Chair declared the meeting adjourned at 6:25 p.m.
Submitted by:
Maria E. Ayala
Clerk of the Board
STEERING COMMITTEE Neeting oate T X0/i3/ Dir.
10/23/2013 10/23/13
AGENDA REPORT Item Number Item Numbe
2 6
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Kanetis, Director of Engineering
SUBJECT: OCSD LEGISLATIVE PROPOSAL
GENERAL MANAGER'S RECOMMENDATION
A. Receive and file a letter from the City of Yorba Linda dated October 16, 2013
requesting a transfer of its seat on the OCSD Board of Directors to the Yorba
Linda Water District; and
B. Direct staff to prepare a legislative proposal to transfer the City of Yorba Linda's
seat on the OCSD Board of Directors to the Yorba Linda Water District.
SUMMARY
The City of Yorba Linda, in a letter dated October 16, 2013 from Assistant City Manager
David Christian, requested that its seat on the OCSD Board of Directors be transferred
to the Yorba Linda Water District. The request is prompted by the City's action to
relinquish ownership of its sewer system to the Yorba Linda Water District. This
transfer, if approved by the OCSD board of directors, would require a change in
OCSD's enabling legislation. At the direction of the Steering and Legislative and Public
Affairs Special Committees, working with General Counsel and our lobbyist in
Sacramento, staff will prepare and present to the Board of Directors, a legislative
proposal to accomplish the transfer.
PRIOR COMMITTEE/BOARD ACTIONS
None.
ADDITIONAL INFORMATION
N/A
CEQA
N/A
Page 1 of 2
BUDGETIDELEGATION OF AUTHORITY COMPLIANCE
N/A
ATTACHMENTS
The following attachment(s) are attached in hard copy and may also be viewed on-line at the OCSD
website(www.ocsd.coml with the complete agenda package:
Letter from Yorba Linda Assistant City Manager dated October 16, 2013.
Page 2 of 2
ICITY OF YORBA LINDA
PA. BOX 87014 CALIFORNIA 82885-8714
October 16,2013
James Herberg
General Manager
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley,CA 92708
Mr. Herberg,
The City of Yorba Linda had previously entered into an agreement with the Yorba Linda Water District
(YLWD),transferring our local sewer service responsibilities to YLWD. In that agreement,the City
committed to supporting YLWD in seeking a seat on the Orange County Sanitation District(OCSD) Board.
We are aware that it is not in OCSD's interest to increase the size of its Board from 25 to 26, nor to have
an even number of Directors. Therefore,at its meeting on October 15, 2013,the City Council voted to
formally request that OCSD seek a legislative change to remove the City from Its Board of Directors and
replace the City's seat with a representative from the YLWD Board of Directors after the City of Yorba
Linda's leadership role on the OCSD's Board has been completed.
By this letter,the City is requesting that OCSD pursue the legislative change mentioned above. Please
let us know if there Is anything further we can provide to assist in this matter.
Sincerely,
Wow 6�L t--:
David Christian
Assistant City Manager
BIRTHPLACE OF RICHARD NIXON • 37'H PRESIDENT OF THE UNITED STATES
ITEM NO. 7
MINUTES OF THE
OPERATIONS COMMITTEE
Engineering, Operations & Maintenance, and Facilities Support Services
Orange County Sanitation District
A regular meeting of the Operations Committee of the Orange County Sanitation District
was held on October 2, 2013, at 5:00 p.m. at the District's Administrative Office.
A quorum was declared present, as follows:
Operations Directors Present: Staff Present:
Tom Beamish, Chair Jim Herberg, General Manager
John Nielsen, Vice Chair Robert Ghirelli, Assistant General Manager
Steve Jones Nick Kanetis, Director of Engineering
Lucille Kring Nick Arhontes, Director of Facilities Support
Michael Levitt Services
Brett Murdock Ed Torres, Director of Operations & Maintenance
Steve Nagel Jeff Reed, Director of Human Resources
Greg Sebourn Lorenzo Tyner, Director of Finance &
Fred Smith Administrative Services
John Anderson, Board Vice Chair Kelly Lore, Administrative Assistant
Cindy Ambrose
Operations Directors Absent: Jennifer Cabral
Keith Curry Rich Castillon
Troy Edgar, Board Chair Jim Colston
Scott Nelson Carla Dillon
Mark Dubois
Mark Esquer
Norbert Gaia
Al Garcia
Todd Haynes
Hardat Khublall
Rob Thompson
Others Present:
Brad Hogin, General Counsel
Bob Ooten, Alternate Director
PUBLIC COMMENTS:
No public comments.
10102J13 Operations Committee Minutes Page 1 of 5
REPORT OF COMMITTEE CHAIR:
Tom Beamish, Committee Chair, did not provide a report.
REPORT OF GENERAL MANAGER:
Jim Herberg, General Manager, did not provide a report.
CONSENT CALENDAR:
1. MOVED, SECONDED, and DULY CARRIED: Approve Minutes of September 4,
2013, Operations Committee meeting.
2. MOVED, SECONDED, and DULY CARRIED:
A. Award a service contract to the lowest responsive and responsible bidder,
Kaveh Engineering and Construction, Inc., for P1 CenGen Hot Water Pipe
Repairs, Project No. FR11-015-R for a total amount not to exceed
$144,695; and,
B. Approve a contingency of$43,400 (30%).
3. MOVED, SECONDED, and DULY CARRIED: Recommend to the Board of
Directors to:
Approve Amendment No. 1 to the Facilities Engineering Task Order No. 12-00-
04-01 with Tran Consulting Engineers providing additional design and
construction services for Slater Ave Pump Station VFD Replacement, FR12-012,
for an additional amount of $26,968, increasing the total not to exceed amount to
$66,931.
4. MOVED, SECONDED, and DULY CARRIED: Recommend to the Board of
Directors to:
A. Award a service contract to the lowest responsive and responsible bidder,
ODC Engineering & Technology, for P1 Potable Water Valve
Replacement, Project No. FR11-020 for a total amount not to exceed
$412,000; and,
B. Approve a contingency of$82,400 (20%).
09/04/13 Operations Committee Minutes Page 2 of 5
5. MOVED, SECONDED, and DULY CARRIED: Recommend to the Board of
Directors to:
A. Award a service contract to the lowest responsive and responsible bidder,
Mode Engineering, for Warner Avenue Relief Sewer Manholes Structural
Repairs, Specification No. FR12-003 for a total amount not to exceed
$338,000; and,
B. Approve a contingency of$67,600 (20%).
6. MOVED, SECONDED, and DULY CARRIED: Recommend to the Board of
Directors to:
Approve Revision No. 1 to the Black & Veatch PLAN2010-01, Task Order 05
(Ocean Outfall Assessments, Project SP-187) in the amount of $19,569 for
additional engineering services to develop Ocean Outfall Booster Station
refurbishment scope of work items, for a total amount not to exceed $67.593.
7. MOVED, SECONDED, and DULY CARRIED: Recommend to the Board of
Directors to:
A. Approve a Professional Consultant Services Agreement with Dudek &
Associates, Inc. to provide construction support services for Boiler System
Rehabilitation and Scrubbers H & I Demolition at Plant No. 2, Project No.
P2-106, for an amount not to exceed $222,503; and,
B. Approve a contingency of$22,250 (10%).
NON-CONSENT:
8. MOVED, SECONDED, and DULY CARRIED: Recommend to the Board of
Directors to:
A. Approve a budget increase of $390,000 for the Bitter Point Force Main
Rehabilitation, Project No. 5-58, for a total project budget of $46,219,000;
and,
B. Approve an increase in contingency of $89,445 (15%), for a total
contingency of $149,075 (25%), to the Professional Consultant Services
Agreement with Black & Veatch to provide construction support services
for the Bitter Point Force Main Rehabilitation, Project No. 5-58, to support
the Santa Ana River Levee and In-Plant Repairs, Phase 2.
09/04/13 Operations Committee Minutes Page 3 of 5
Dean Fisher, Engineering Manager, presented a PowerPoint regarding the Santa
Ana River Levees and In-Plant Repairs; providing background on Project 5-58,
Bitter Point Force Main Rehabilitation and its status.
9. MOVED, SECONDED, and DULY CARRIED: Recommend to the Board of
Directors to:
Approve the Purchasing Ordinance, Ordinance No. OCSD-XX entitled
"Establishing Requirements and Procedures for the Purchase of Goods,
Services, and Public Works Projects" for first reading at the October 2013 Board
meeting.
Lorenzo Tyner, Director of Finance & Administrative Services provided a short
presentation to the Committee regarding the background of the current
Purchasing Authority and changes that are to be incorporated into the new
Ordinance. Mr. Tyner answered questions from the Committee regarding
Prequalification, bid protests and online bidding.
INFORMATION ITEMS:
10. Waste Discharge Requirement (WDR) Order for Sewers - Internal Audit Report
and Amended Order Update.
Carla Dillon, Engineering Supervisor, presented a PowerPoint regarding the
Amended Order Update and Internal Audit Report on Waste Discharge
Requirements for Sewers, and answered questions from the Committee
regarding Sanitary Sewer Overflows and the comparison of Orange County
Sanitation District to other agencies.
DEPARTMENT HEAD REPORTS:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA
ITEMS, IF ANY:
None.
09 OW13 Operations CommRee Minutes Page 4 of 5
ADJOURNMENT:
At 5:45 p.m., Committee Chair Beamish declared the meeting adjourned to the next
scheduled meeting on Wednesday, November 6, 2013 at 5:00 p.m.
Submitted by:
Kelly A. Lore
Administrative Assistant
09/04/13 Operations Committee Minutes Page 5 of 5
OPERATIONS COMMITTEE Maeting Dale TOBd 0/1DIr.
10/02/13 10/23/13
AGENDA REPORT Item Number Item Number
3 a
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Arhontes, P.E., Director of Facilities Support Services
Engineering Manager: Mark Esquer, P.E., Facilities Support Services
Project Manager: Steve Speakman, P.E.
SUBJECT: SLATER AVE. PUMP STATION VFD REPLACEMENT,
PROJECT NO. FR12-012
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the Facilities Engineering Task Order No. 12-00-04-01
with Train Consulting Engineers providing additional design and construction services
for Slater Ave Pump Station VFD Replacement, FR12-012, for an additional amount of
$26,968, increasing the total not to exceed amount to $66,931.
SUMMARY
Project No. FR12-012 originally involved replacing of one of the electronic pump drive
modules within each of the variable frequency drive (VFD) systems at Slater Avenue
Pump Station in Huntington Beach. Task Order 12-00-04-01 was issued to Tran
Consulting Engineers for developing bid documents (plans & specifications) in
accordance with Resolution No. OCSD 07-04 Section 7.02.
As part of the Task Order issued, Tran Consulting was required to assess the condition
of the VFDs. Based upon the assessment, it is recommended to replace the entire VFD
system for all five main pumps. It turns out that the entire VFD is obsolete. The existing
VFD control enclosures were installed in 1993-94 and are at the end of their estimated
useful life (20 years). The new VFD will be more efficient and will reduce O&M costs
over the next 10 to 20 year period. Spare parts when needed will be readily available.
Tran Consulting Engineers performed the engineering assessment and they have a
thorough understanding of the additional design. Staff has determined that the
proposed price is fair and reasonable for the scope of work.
Staff recommends approval of Amendment No. 1 to Task Order No. 12-00-04-01 with
Tran Consulting Engineers for an additional amount of$26,968.
PRIOR COMMITTEE/BOARD ACTIONS
June 2012 — Board approved Tran Consulting Engineers as one of the pre-approved
firms for engineering design and construction support services necessary in supporting
Facilities Engineering and Facilities Repair projects.
Page 1 of 2
ADDITIONAL INFORMATION
Board Resolution No. OCSD 07-04 section 7.02 allows the Orange County Sanitation
District (Sanitation District) to compile a master pre-approved list of between five and
ten consulting firms for assisting staff on Facilities Engineering projects, and sets a
maximum annual limitation of $100,000 for each firm. The Resolution delegates to the
General Manager and Director of Engineering authority to solicit proposals for design
engineering services to complete Facilities Engineering projects and award individual
Task Orders for this work up to $75,000.
In addition, the Resolution limits the General Managers authorization for amendments
to an individual Task Order in an amount up to $25,000, and the total combined value of
the Task Order and all amendments are not to exceed $100,000.
The total Task Order amount is $66,931 inclusive of Amendment No. 1, which is less
than $100,000, however; Amendment No. 1 is in the amount of $26,968, which exceeds
the General Manager's authority as defined in the Resolution.
CEQA
The FR12-012 project has been determined to be categorically exempt in accordance
with Section 15302 (c). A Notice of Exemption was filed on September 16, 2013.
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
This request complies with authority levels of the Sanitation District's Delegation of
Authority. This item has been budgeted and will be funded from the current Budget
(FY 2013-14, Joint FE-J, Section 8, Page 12).
Date of ADDroval Contract Amount Contingency
10/2113 $66,931 $0
ATTACHMENTS
The following attachment(s) may be viewed on-line at the OCSD website (wwwocsd.com) with the
complete agenda package:
• Original Task Order
• Amendment No. 1 to Task Order
ME:SS:eh
Page 2 of 2
Return to Mende Report t1AN, ORANGE COUNTY SANITATION DISTRICT
We Pue0.NNic IWIe m tle emer cant by Pmid"effective wastewater collection.VeaVret,and mcychiOJ
January 15, 2013
Tran Consulting Engineers
John F. Austin
4444 El Cajon Blvd., Suite 15
San Diego, CA 92115
samin9 SUBJECT: Design Notice to Proceed —Task Order No. 12-00-04-01
P.O. No. 104617-OB for SA-11 Slater Ave Pump Station VFD
Bma Replacement, Job No. FR12-012
Buena Park
)p ess
This letter constitutes the Notice to Proceed for the design of the subject
`""crew came, project. The effective start date is January 30, 2013. Please submit the final
BAa. design documents for this project in accordance with the enclosed scope of
careen ease work.
Huntington Beach
Also please execute the professional services as outlined in your Proposal
k. dated November 26, 2012, for a total contract amount not to exceed $39,963.
La Hama
L.Pakna If you have any questions, please contact the project manager, Steve
Les Akr . Speakman, at(714) 593-739$.
Nawywa Beach r�anga
Ra.u.
sarca nna James D. Herberg, P.E., BCEE
Assistant General Manager
Seal Beach
stantan CD:SS:am
T uia EMS 9 003968605
Va.Pak Enclosure
Y Linea
Caeca We. cc: M. Esquer
saca,y Da, m' C. Dillon
tramway 04 S. Speakman
se^ °mot R. Cuellar
k,;na Rash C. Stanford
t�ouvitt
Gcuncy aL Orange
e�;C� 10344 His avenge . rg,nravl vNley,ra 92700 7018 . vtal 952 2411 . www.asd.aan
Return b Mende Rewd
1S
ORANGE COUNTY SANITATION DISTRICT
0pMemorandum
CO
DATE: January 15, 2013
TO: James D. Herberg, P.E.
Assistant General Manager
FROM: Mark Esquer ,
Engineering Manager
SUBJECT: Service Area 11 Slater Avenue Pump Station VFD Replacement, Project No.
FR12-012
Re: FIR Task Order Award Recommendation
In accordance with Resolution No. OCSD 07-04, Section 5.04 Facilities Engineering Project:
Selection of Consultants—Procedure, the attached Proposals meet the criteria for issuing a
Task Order to complete the design of the subject project.
This Task Order is for professional engineering services to prepare final design plans,
construction cost estimates, and bid documents for the SA-11 Slater Ave Pump Station VFD
Replacement, Project FR12-012. The Scope of Work consist of the replacing five Variable
Frequency Drive modules. The Slater Avenue Pump Station located in the City of Huntington
Beach, CA.
On November 6, 2012,we issued three Request for Proposals to the following Design
Consultants:
1. Psomas
2. Tran Consulting Engineers (Tran)
3. Lee and Ro , Inc. (Lee & Ro)
On November 26, 2012,we received Proposals from Tran and Lee & Ro. Psomas
sent a written correspondence on November 13, 2012 declining preparation of a proposal due to
the fact that they would have to utilize a sub-consultant for a majority of the work.
The following summarizes the cost proposal from each Consultant:
1. Tran $39,963
2. Lee& Ro, Inc. $44,921
Staff reviewed the two proposals received and Tran was selected. This firm understood the
project, provided a comprehensive project approach and scope and had the lowest cost.
Staff recommends awarding a Task Order to Tran for a total amount not to exceed$39,963 for
the completion of this project design. If you concur with our recommendation, please sign the
attached Notice to Proceed. Otherwise please call me at 7030 or Carla Dillon at 7371 to
discuss.
Return to Mende Report
FR12-012 Task Order Award Recommendation
Page 2 of 2
January 15, 2013
The table provided as Attachment#2 presents a summary of the Task Orders issued to the
recommended Consultant for FY2012/2013.
ME:SS:am
EDMS:W396934N 5.11
Attachments:
1. Notice to Proceed Letter with SOW Attachment
2. FE Consultant Task Order Matrix
3. Proposals
cc: N. Arhontes
M. Esquer
C. Dillon
S. Speakman
R. Cuellar
Return to Mende Report
49
ORANGE COUNTY SANITATION DISTRICT
p Memorandum
DATE: October 23, 2013
TO: James D. Herberg
General Manager
FROM: Nick Kanetis, P.E.
Director of Engineering
SUBJECT: Approval of Amendment No. 1 to Existing Task Order No. 12-00-04-01 with Tram
Consulting Engineers for an Additional Amount of $26,968 with a Total Amount Not to
Exceed $66,931 for Project No. FR12-012 Slater Avenue Pump Station VFD
Replacement
In accordance with Resolution No. OCSD 07-04, Section 7.02, the Task Order Amendment for Slater Avenue
Pump Station VFD Replacement, Project No. FR12-012 meets the criteria for General Manager approval.
The original Task Order was for professional engineering services of designing the replacement of certain
components of the VFDs at the Slater Avenue Pump Station in the City of Huntington Beach, CA. This
amendment is for the additional costs of designing the replacement of the entire VFDs at this station.
The cost for these modifications has been negotiated to the current proposal of$26,968. The money for this
project will come from the current 2013-14 Budget(Joint FE-J, Section 8, Page 12).
Staff recommends that Tran Consulting Engineers be authorized to perform the necessary additional services
in Amendment No. 1 for an amount not to exceed $26,968. The total price not to exceed for this Task Order
is$66,931.
This information was approved at the Board of Directors meeting on October 23, 2013 and is provided on the
Board Services website.
Please indicate your approval by signing below.
James D. Herberg, General Manager Date
NK:ME:eh
Attachments:
Request for Proposal and SOW
Consultant Proposal
Operations Approval
cc: R. Cuellar
S. Speakman
M. Esquer
E. Harvey
OPERATIONS COMMITTEE Meeting Date TOBd.of Dir.
10/02/13 10/23/13
AGENDA REPORT Item Item Number
4 9
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Arhontes, P.E., Director of Facilities Support Services
Engineering Manager: Mark Esquer, P.E., Facilities Support Services
Project Manager: John Falkenstein, P.E.
SUBJECT: AWARD P1 POTABLE WATER VALVE REPLACEMENT,
PROJECT NO. FR11-020
GENERAL MANAGER'S RECOMMENDATION
A. Award a service contract to the lowest responsive and responsible bidder, ODC
Engineering & Technology, for P1 Potable Water Valve Replacement, Project No.
FR11-020 for a total amount not to exceed $412,000; and,
B. Approve a contingency of$82,400 (20%).
SUMMARY
This project replaces potable water valves in 14 different locations at Reclamation Plant
No. 1 that are no longer reliable and beyond their useful life. Operation of these valves
is critical to isolate the potable water system serving the Administration, Laboratory,
Warehouse, and Maintenance Buildings. The work also includes excavation,
replacement of deteriorated concrete vaults and covers, new piping connections,
backfill, and repaving around the new vaults. This project's scope of work is based on
an assessment by Operations and Engineering staff in 2011.
Per our plans and specifications, OCSD advertised for bids on June 5, 2013. Sealed
bids were received on August 15, 2013. The bids were evaluated in accordance with
the OCSD's policies and procedures. CDC Engineering & Technology was deemed the
lowest responsive, responsible bidder. Staff recommends awarding a contract to CDC
Engineering & Technology for Potable Water Valve Replacement, Project No. FR11-020
for a total amount not to exceed $412,000.
PRIOR COMMITTEE/BOARD ACTIONS
None
Page 1 of 3
ADDITIONAL INFORMATION
Summary information on the bid submittal for Potable Water Valve Replacement,
Project No. FR11-020 is as follows:
Engineer's Estimate $650,000
Bidder Amount of Bid
ODC Engineering &Technology $412,000
Environmental Assessment and Remediation Management, Inc. $435,000
Green Building Corporation $459,000
J.F. Shea Construction, Inc. $466,052
Fraijo Brothers Inc. $482,929
Bali Construction, Inc. $498,431
Recon Engineering and Construction $550,347
Tharsos Inc. $584,299
Dahl, Taylor&Associates, Inc. $613,025
Irwin Industries $621,997
Abhe & Svoboda Inc. $629,062
Verne's Plumbing Inc $641,405
Delaying these repairs and/or replacements could result in the inability of OCSD
Operations staff to isolate the potable water system in the event of a pipeline rupture or
leakage. The potable water pipelines serving the Administration, Laboratory,
Warehouse, and Maintenance Buildings are now over 50 years old and the inability to
isolate the pipelines could result in flooding and possible damage to equipment and
furnishings inside the buildings. The new valves are expected to last at least 50 years
with periodic maintenance and exercising. The project is scheduled to begin in
November 2013 and construction is anticipated to be complete by March 2014.
CEQA
A Notice of Exemption has been filed for this work on June 21, 2013. The project is
categorically exempt from CEQA under section 15302 (c) — replacement or
reconstruction of existing utility systems and/or facilities involving negligible or no
expansion of capacity.
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
This request complies with authority levels of the OCSD's Delegation of Authority. This
repair will be funded through the Small Capital Replacement /Rehabilitation Project SP-
34 (Budget Update Fiscal Year 2012-2013 and 2013-2014 Misc. & Support Projects;
Section 8 — Page 111). This Small Capital fund is used to pay for capital repairs and/or
direct replacements. The SP-34 budget is adequate to cover this project.
Page 2 of 3
Date of Approval Contract Amount Continaencv
10/23/13 $412,000 $82,400(20%)
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.coml with the
complete agenda package and attachments:
Service Agreement (7 pages)
ME:JF:eh
Page 3 of 3
Return to Aoenda Reporl
SERVICE CONTRACT
Plant 1 Potable Water Valve Replacement
Specification No. FRI1-020 THIS CONTRACT is made and entered into as of the date fully executed below by and between
Orange County Sanitation District, with a principal place of business at 10844 Ellis Avenue,
Fountain Valley, CA 92708-7018 (hereinafter referred to as "OCSD") and ODC Engineering &
Technology with a principal business at 5675 Walnut Ridge Dr., Agoura hills, CA 91301
(hereinafter referred to as "Contractor") collectively referred to as the'Parties".
WITNESSETH
WHEREAS, OCSD desires to retain the services of Contractor to Repair Manhole Structures of
the Warner Avenue Relief Sewer in accordance with these Contract Documents ("Services');
and
WHEREAS, OCSD has chosen Contractor to conduct Services in accordance with Purchasing
Resolution No. OCSD07-04; and
WHEREAS, on October 23, 2013, the Board of Directors of OCSD, by minute order, authorized
execution of this Contract between OCSD and Contractor, and
WHEREAS, Contractor is qualified by virtue of experience, training, and education and
expertise to accomplish such Services,
NOW THEREFORE, in consideration of the promises and mutual benefits exchanged between
the Parties, it is mutually agreed as follows:
1. Introduction -
1.1 This Contract and all exhibits hereto (called the "Contract') is made by OCSD and
Contractor. The Terms and Conditions herein exclusively govern the purchase of Services as
described in the Scope of Work, attached hereto and incorporated herein by reference as
Exhibit"A".
1.2 Exhibits to this Contract are incorporated by reference and made a part of this Contract
as though fully set forth at length herein. Exhibits to this Contract are as follows in order of
precedence:
Exhibit"A" Conformed Scope of Worki7echnical Specifications
Exhibit"B" Bid Pricing
Exhibit"C" OCSD Safety and Human Resources Policies
Exhibit "D" Acknowledgment of Insurance Requirements
Exhibit"E" Faithful Performance and Payment Bonds
1.3 In the event of any conflict or inconsistency between the provisions of this Contract and
any of the provisions of the exhibits hereto, the provisions of this Contract shall in all respects
govern and control.
1.4 The provisions of this Contract may be amended or waived only by a writing executed by
authorized representatives of both Parties hereto. _
1.5 The various headings in this Contract are inserted for convenience only and shall not
affect the meaning or interpretation of this Contract or any Paragraph or provision hereof.
Orange County Sanitation District 1 of 7 Specification No.FR11-020
Return to Aoenda Reporl
1.6 The term "days", when used in the Contract, shall mean calendar days, unless otherwise
noted as business days.
1.7 The term "hours", when used in this Contract, shall be as defined in Exhibit "A".
1.8 Contractor shall provide OCSD with all required premiums and/or overtime work at no _
charge beyond the price provided under"Compensation" below. -
1.9 Except as expressly provided otherwise, OCSD accepts no liability for any expenses, _
losses, or action incurred or undertaken by Contractor as a result of work performed in
anticipation of purchases of said services by OCSD.
2. Compensation Compensation for this project shall not exceed the total amount of Four
Hundred Twelve Thousand and 00/00 Dollars ($412,000.00) nor item amounts bid in Exhibit "B".
3. Payments Payments shall be made monthly upon completion of items bid and approval -
by OCSD Project Engineer, John Falkenstein or his designee, of invoices submitted for work
completed as described in Exhibit "A". OCSD, at its sole discretion, shall be the determining
party as to whether the tasks and deliverables have been satisfactorily completed.
4. Invoices
4.1 OCSD shall pay within 30 days of completion and receipt and approval by OCSD Project
Engineer of an itemized invoice, in a form acceptable to OCSD to enable audit of the charges
thereon. Contractor shall not pay less than the prevailing wage, if applicable. Invoices shall
include the Purchase Order Number.
5. Audit Rights Contractor agrees that, during the term of this Contract and for a period of _
three (3) years after its termination, OCSD shall have access to and the right to examine any
directly pertinent books, documents, and records of Contractor relating to the invoices submitted
by Contractor pursuant to this Contract.
5.1 Invoices shall be emailed by Contractor to OCSD at the following email address and the
Purchase Order number shall be referenced in the subject line: APStaff0OCSD.com.
6. scope of Work Subject to the terms of this Contract, Contractor shall perform the
Services identified in Exhibit "A". Contractor shall perform said Services in accordance with
generally accepted industry and professional standards.
7. Modifications to Scope of Work Requests for modifications to the Scope of Work
hereunder can be made by OCSD at any time. All modifications must be made in writing and
signed by both Parties.
8. Contract Term The Services provided under this Contract shall be completed within
150 days from the date of notice to proceed.
9. Performance Time is of the essence in the performance of this Contract and the
provisions hereof.
10. Force Majeure Neither party shall be liable for delays caused by accident, flood, acts of
God, fire, labor trouble, war, acts of government or any other cause beyond its control, but said
party shall use reasonable efforts to minimize the extent of the delay. Work affected by a Force
Majeure condition may be rescheduled by mutual consent or may be eliminated from the
Contract.
Orange County Sanitation District 2 of 7 Specification No.FR11-020
Return to Aoenda Reporl
11. Termination
11.1 OCSD reserves the right to terminate this Contract for its convenience, with or without
cause, in whole or in part, at any time, by written notice from OCSD, (delivered by certified mail,
return receipt requested) of intent to terminate. Upon receipt of a termination notice, Contractor
shall immediately discontinue all work under this Contract (unless the notice directs otherwise).
OCSD shall thereafter, within thirty (30) days, pay Contractor for work performed (cost and fee)
to the date of termination. Contractor expressly waives any claim to receive anticipated profits to
be earned during the uncompleted portion of this Contract. Such notice of termination shall
terminate this Contract and release OCSD from any further fee, cost or claim hereunder by
Contractor other than for work performed to the date of termination.
11.2 OCSD reserves the right to terminate this Contract immediately upon OCSD's
determination that Contractor is not meeting specification requirements, if the level of service is
inadequate, or any other default of this Contract.
11.3 OCSD may also immediately cancel for default of this Contract in whole or in part by -
written notice to Contractor:
• if Contractor becomes insolvent or files a petition under the Bankruptcy Act; or
• if Contractor sells its business; or
• if Contractor breaches any of the terms of this Contract; or
• if total amount of compensation exceeds the amount authorized under this Contract.
11.4 All OCSD property in the possession or control of Contractor shall be returned by
Contractor to OCSD upon demand, or at the termination of this Contract, whichever occurs first.
12. Insurance Contractor and all subcontractors shall purchase and maintain, throughout
the life of this Contract and any periods of warranty or extensions, insurance in amounts equal
to the requirements set forth in the signed Acknowledgement of Insurance Requirements -
(attached hereto and incorporated herein as Exhibit "D"). Contractor shall not commence work
under this Contract until all required insurance is obtained in a form acceptable to OCSD, nor
shall Contractor allow any subcontractor to commence service pursuant to a subcontract until all
insurance required of the subcontractor has been obtained. Failure to maintain required
insurance coverage shall result in termination of this Contract.
13. Bonds
13.1 Contractor shall, before entering upon the performance of this Contract, furnish bonds
(attached hereto in Exhibit °E") approved by OCSD's General Counsel - one in the amount of
one hundred percent (100%) of the Contract price bid, to guarantee the faithful performance of
the work, and the other in the amount of one hundred percent (100%) of the Contract price bid,
to guarantee payment of all claims for labor and materials furnished. This Contract shall not
become effective until such bonds are supplied to and approved by OCSD. Bonds must be
issued by a surety authorized by the State Insurance Commissioner to do business in California
and must be maintained throughout the fife of the project and during the warranty period.
13.2 Contractor is hereby notified that it is required that the person executing the Bonds must
have on file with the County Clerk, County of Orange, a Power of Attorney and authorization to
execute said Bonds for and on behalf of the corporate surety. The purpose of this requirement
is to insure that the provisions of Code of Civil Procedure Section 995.630 requiring such
authority to be on file with the Orange County Clerk are satisfied in order for the OCSD and its
officers to approve the bond.
Orange County Sanitation District 3 of 7 Specification No.FR11-020
Return to Aoenda Renod
14. Indemnification and Hold Harmless Provision Contractor agrees to save, indemnify,
defend and hold harmless OCSD against any and all liability, claims, judgments, cost and
demands, including demands arising from injuries or death of persons and damage to property,
arising directly or indirectly out of the negligence or willful misconduct of Contractor, its
employees or agents, in relation to the rendition of services pursuant to this Contract, except
claims or litigations arising through the sole negligence or willful misconduct of OCSD.
Contractor agrees to reimburse OCSD for any expenditure, including reasonable attomey's
fees, OCSD may incur by reason of such matters, and, if requested by OCSD, will defend any
such suits at the cost and expense of Contractor.
15. Safety and Human Resources fHR1 Policies OCSD requires all contractors and _
service providers to follow and ensure their employees and all subcontractors follow all State
and Federal regulations as well as OCSD requirements while working at OCSD locations. If
during the course of a contract it is discovered that OCSD policies, safety manuals, or contracts
do not comply with State or Federal regulations then the Contractor is required to follow the
most stringent regulatory requirement at no cost to OCSD. Contractor and all their employees
and subcontractors, shall adhere to all applicable OCSD Safety, Human Resources, and
Chemical Delivery Procedures found at: OCSD.com, "Doc Central" (bottom of page), under
"Safety" (see Exhibit "C" hereto).
16. Warranty In addition to the specific requirements under Exhibit "A", System 204 -
Waterproofing, the following shall apply:
16.1 Manufacturer's standard warranty shall apply. All manufacturer warranties will begin at
date of completion of this Contract.
16.2 Contractor's warranty: If, within the 12-month period following completion of its Services, _
OCSD informs Contractor that any part of the Services fails to meet the standards required
under this Contract, Contractor shall, within the time agreed to by OCSD and Contractor, take all such actions as are necessary to correct or complete the noted deficiency(ies).
17. Familiarity with Work By executing this Contract, Contractor warrants that: 1) it has
investigated the work to be performed; 2) it has investigated the site of the work and is aware of all conditions there; and 3) it understands the facilities, difficulties and restrictions of the work
under this Contract. Should Contractor discover any latent or unknown conditions materially
differing from those inherent in the work or as represented by OCSD, it shall immediately inform
OCSD of this and shall not proceed, except at Contractor's risk, until written instructions are
received from OCSD.
1& Regulatory Requirements Contractor shall perform all work under this Contract in
strict conformance with applicable federal, state, and local regulatory requirements including,
but not limited to, 40 CFR 122, 123, 124, 257, 258, 260, and 261, Title 22, 23, and California
Water Codes Division 2.
19. Licenses. Permits. Ordinances and Regulations Contractor represents and warrants
to OCSD that it has obtained all licenses, permits, qualification and approvals of whatever
nature that are legally required to engage in this work. Any and all fees required by State,
County, City and/or municipal laws, codes and/or tariffs that pertain to work performed under the
terms of this Contract will be paid by Contractor.
20. Govemina Law This Contract shall be governed by and interpreted under the laws of
the State of California and the Parties submit to jurisdiction in Orange County, in the event any
action is brought in connection with this Contract or the performance thereof.
Orange County Sanitation Distnct 4 of Specification NO.FRII-020
Return to Aoenda Reporl
21. Applicable Laws and Reaulations Contractor shall comply with all applicable federal,
state, and local laws, rules, and regulations. Contractor also agrees to indemnify and hold
harmless from any and all damages and liabilities assessed against OCSD as a result of
Contractor's noncompliance therewith. Any permission required by law to be included herein
shall be deemed included as a part of this Contract whether or not specifically referenced.
22. Public Confracts Law OCSD has been advised by the State of California Director of
Industrial Relations of its determination of the general prevailing rate of per diem wages and the
general prevailing rate for legal holiday and overtime work in the locality in which the work is to
be performed for each craft or type of work needed to execute this Contract. Contractor agrees
that not less than said prevailing rates shall be paid to workers employed on this project as
required by Labor Code Section 1774 of the State of California.
23. Breach The waiver of either party of any breach or violation of, or default under, any
provision of this Contract, shall not be deemed a continuing waiver by such party of any other
provision or of any subsequent breach or violation of this Contract or default thereunder. Any
breach by Contractor to which OCSD does not object shall not operate as a waiver of OCSD's
rights to seek remedies available to it for any subsequent breach.
24. Remedies In addition to other remedies available in law or equity, if the Contractor fails
to make delivery of the goods or Services or repudiates its obligations under this Contract, or if
OCSD rejects the goods or Services or revokes acceptance of the goods or Services, OCSD
may (1) cancel the Contract; (2) recover whatever amount of the purchase price OCSD has
paid, and/or (3) 'cover" by purchasing, or contracting to purchase, substitute goods or Services
for those due from Contractor. In the event OCSD elects to "cover as described in (3), OCSD _
shall be entitled to recover from Contractor as damages the difference between the cost of the
substitute goods or Services and the contract price, together with any incidental or _
consequential damages.
25. Dispute Resolution
25.1 In the event of a dispute as to the construction or interpretation of this Contract, or any
rights or obligations hereunder, the Parties shall first attempt, in good faith, to resolve the
dispute by mediation. The Parties shall mutually select a mediator to facilitate the resolution of -
the dispute. If the Parties are unable to agree on a mediator, the mediation shall be conducted
in accordance with the Commercial Mediation Rules of the American Arbitration Agreement,
through the alternate dispute resolution procedures of Judicial Arbitration through Mediation
Services of Orange County ("JAMS"), or any similar organization or entity conducting an
alternate dispute resolution process.
25.2 In the event the Parties are unable to timely resolve the dispute through mediation, the
issues in dispute shall be submitted to arbitration pursuant to California Code of Civil Procedure,
Part 3, Title 9, Sections 1280 at seq. For such purpose, an agreed arbitrator shall be selected,
or in the absence of agreement, each party shall select an arbitrator, and those two arbitrators
shall select a third. Discovery may be conducted in connection with the arbitration proceeding
pursuant to Carrfornia Code of Civil Procedure Section 1283.05. The arbitrator, or three
arbitrators acting as a board, shall take such evidence and make such investigation as deemed
appropriate and shall render a written decision on the matter in question. The arbitrator shall
decide each and every dispute in accordance with the laws of the State of California. The
arbitrator's decision and award shall be subject to review for errors of fact or law in the Superior
Court for the County of Orange, with a right of appeal from any judgment issued therein.
25. Survival The provisions of this Contract dealing with Payment, Warranty, and Forum for
Enforcement, shall survive termination or expiration of this Contract.
Orange County Sanitation District 5 of Specification No.FR11-020
Return to Aoenda Renod
27. Attorney's Fees If any action at law or inequity or if any proceeding in the form of an
Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this
Contract, the prevailing party shall be entitled to reasonable attorneys fees, costs and
necessary disbursements in addition to any other relief to which he may be entitled.
28. Severability If any section, subsection, or provision of this Contract, or any agreement
or instrument contemplated hereby, or the application of such section, subsection, or provision
is held invalid, the remainder of this Contract or instrument in the application of such section,
subsection or provision to persons or circumstances other than those to which it is held invalid,
shall not be affected thereby, unless the effect of such invalidity shall be to substantially
frustrate the expectations of the Parties.
29. Damage to OCSD's Property Any of OCSD's property damaged by Contractor, any
subcontractors or by the personnel of either will be subject to .repair or replacement by
Contractor at no cost to OCSD.
30. Freiaht(F.O.B. Destination) Contractor assumes full responsibility for all transportation,
transportation scheduling, packing, handling, insurance, and other services associated with
delivery of all products deemed necessary under this Contract.
31. South Coast Air Quality Manaaement District's (SCAQMD) Requirements It is
Contractor's responsibility that all equipment furnished and installed be in accordance with the
latest rules and regulations of the South Coast Air Quality Management District (SCAQMD). All
contract work practices, which may have associated emissions such as sandblasting, open field
spray painting or demolition of asbestos containing components or structures, shall comply with _
the appropriate rules and regulations of the SCAQMD.
32. Disclosure Contractor agrees not to disclose, to any third party, data or information
generated from this project without the prior written consent from OCSD. -
33. Limitations upon Subcontracting and Assignment Contractor shall not delegate any
duties nor assign any rights under this Contract without the prior written consent of OCSD. Any
such attempted delegation or assignment shall be void. -
34. Third Party Rights Nothing in this Contract shall be construed to give any rights or
benefits to anyone other than OCSD and Contractor.
35. Read and Understood By signing this Contract, Contractor represents that he has read
and understood the terms and conditions of the Contract.
36. Authority to Execute The persons executing this Contract on behalf of the Parties
warrant that they are duly authorized to execute this Contract and that by executing this
Contract, the Parties are formally bound.
37. Entire Contract This Contract constitutes the entire agreement of the Parties and
supersedes all prior written or oral and all contemporaneous oral agreements, understandings,
and negotiations between the Parties with respect to the subject matter hereof.
Orange County Sanitation District 6 of 7 Specification No.FR11-020
Return to Aoenda Reood
X Notices All notices under this Contract must be in writing. Written notice shall be sent
by registered or certified mail, postage prepaid, return receipt requested, or by any other
overnight delivery service which delivers to the noticed destination and provides proof of
delivery to the sender. Any facsimile notice must be followed within three (3) days by written
notice. All notices shall be effective when first received at the following addresses:
OCSD: Clarice M. Marcin
Senior Contracts Administrator
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708-7018
Contractor: ODC Engineering &Technology
IN WITNESS WHEREOF, the Parties hereto have hereunto set their hands the day and year
indicated below.
ORANGE COUNTY SANITATION DISTRICT
Dated: By:
Chair Board of Directors
Dated: By:
Clerk of the Board
Dated. By:
Contracts/Purchasing Manager
ODC Engineering & Technology
Dated: By:
Print Name and Title of Officer
IRS Employer's I.D. Number
Orange County Sanitation District 7 of 7 Specification No.FR11-020
OPERATIONS COMMITTEE Meeting Date TOBd.of Dir.
10/02/13 10/23/13
Item AGENDA REPORT NNumber Item Nu
5 Nu
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Arhontes, P.E., Director of Facilities Support Services
Engineering Manager: Mark Esquer, P.E., Facilities Support Services
Project Manager: Chuck Hodge, P.E., Facilities Support Services
SUBJECT: AWARD WARNER AVENUE RELIEF SEWER MANHOLES
STRUCTURAL REPAIRS, SPECIFICATION NO. FR12-003
GENERAL MANAGER'S RECOMMENDATION
A. Award a service contract to the lowest responsive and responsible bidder, Mode
Engineering, for Wamer Avenue Relief Sewer Manholes Structural Repairs,
Specification No. FR12-003 for a total amount not to exceed $338,000; and,
B. Approve a contingency of$67,600 (20%).
SUMMARY
This project repairs five manhole structures on Warner Avenue in Huntington Beach.
This work consists of replacing the top concrete slab, installing concrete aprons around
the new top slabs to protect pavement during top slab replacement, installing twelve
lightweight manhole frames and covers made from a composite material, and minor
concrete repairs within one of the manhole structures.
The replacement frames and covers are designed to current industry standards and are
expected to last 40 to 50 years under normal conditions. The project should reduce the
noise associated with vehicular traffic driving over the covers and will also provide faster
access to sewers during any maintenance activities. OCSD has received noise
complaints from local residents. The project is scheduled to begin in November 2013
and construction is anticipated to be completed by March 2014.
Per our plans and specifications, OCSD advertised for bids on June 25, 2013. Sealed
bids were received on August 1, 2013. The bids were evaluated in accordance with the
OCSD's policies and procedures. Mode Engineering was deemed the lowest,
responsive, and responsible bidder. Staff recommends awarding a contract to Mode
Engineering for Warner Avenue Relief Sewer Manholes Structural Repairs,
Specification No. FR12-003 for a total amount not to exceed $338,000.
Page 1 of 2
PRIOR COMMITTEE/BOARD ACTIONS
None
ADDITIONAL INFORMATION
Summary information on the bid submittal for Warner Avenue Relief Sewer Manholes
Structural Repairs, Specification No. FR12-003 is as follows:
Engineer's Estimate $304,900
Bidder Amount of Bid
Mode Engineering $338,000
Charles King Company $338,750
Bali Construction, Inc. $429,826
Green Building Corporation $438,500
Issues associated with the current rectangular covers include anchor bolt thread
stripping and noise complaints associated with cars driving over the loose plates and
increased risk to the public during driving. It is also currently difficult and time
consuming to access sewers for inspection and maintenance due to the need to remove
and replace over 20 bolts per cover. Heavy lifting requirements also add additional
equipment needed to complete the tasks.
CEQA
A Notice of Exemption has been filed for this work. The project is categorically exempt
from CEQA under section 15301 (b)— replacement or repair of existing manhole
structures for a publicly owned utility involving no expansion of existing capacity or use.
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
This request complies with authority levels of the OCSD's Delegation of Authority. This
repair will be funded through the Small Capital Replacement /Rehabilitation Project SP-
34 (Budget Update Fiscal Year 2012-2013 and 2013-2014 Misc. & Support Projects;
Section 8 — Page 111). This Small Capital fund is used to pay for capital repairs and/or
direct replacements. The SP-34 budget is adequate to cover this project.
Date of Approval Contract Amount Contincencv
10/23/13 $338,000 $67,600(20%)
ATTACHMENTS
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.coml with the
complete agenda package and attachments:
Service Agreement (7 pages)
ME:CH:eh
Page 2 of 2
Return to Aoenda Reporl
SERVICE CONTRACT
Repair to Manhole Structures of Warner Avenue Relief Sewer
Specification No. FR12-003
THIS CONTRACT is made and entered into as of the date fully executed below by and between
Orange County Sanitation District, with a principal place of business at 10844 Ellis Avenue,
Fountain Valley, CA 92708-7018 (hereinafter referred to as "OCSD") and Mode Engineering
with a principal business at 29703 #B Niguel Road, Laguna Niguel CA 92677 (hereinafter
referred to as "Contractor") collectively referred to as the"Parties".
WITNESSETH
WHEREAS, OCSD desires to retain the services of Contractor to Repair Manhole Structures of
the Warner Avenue Relief Sewer in accordance with these Contract Documents ("Services");
and
WHEREAS, OCSD has chosen Contractor to conduct Services in accordance with Purchasing
Resolution No. OCSD07-04; and
WHEREAS, on October 23, 2013, the Board of Directors of OCSD, by minute order, authorized
execution of this Contract between OCSD and Contractor, and
WHEREAS, Contractor is qualified by virtue of experience, training, and education and
expertise to accomplish such Services,
NOW THEREFORE, in consideration of the promises and mutual benefits exchanged between
the Parties, it is mutually agreed as follows:
1. Introduction -
1.1 This Contract and all exhibits hereto (called the "Contract") is made by OCSD and
Contractor. The Terms and Conditions herein exclusively govem the purchase of Services as
described in the Scope of Work, attached hereto and incorporated herein by reference as
Exhibit "A". -
1.2 Exhibits to this Contract are incorporated by reference and made a part of this Contract
as though fully set forth at length herein. Exhibits to this Contract are as follows in order of
precedence:
Exhibit"A" Scope of Work/Technical Specifications as Modified by Addenda 1 and 2
Exhibit"B" OCSD Safety and Human Resources Policies
Exhibit"C" Acknowledgment of Insurance Requirements
Exhibit "D" Faithful Performance and Payment Bonds
1.3 In the event of any conflict or inconsistency between the provisions of this Contract and
any of the provisions of the exhibits hereto, the provisions of this Contract shall in all respects
govern and control.
1.4 The provisions of this Contract may be amended or waived only by a writing executed by
authorized representatives of both Parties hereto.
1.5 The various headings in this Contract are inserted for convenience only and shall not
affect the meaning or interpretation of this Contract or any Paragraph or provision hereof.
Orange County Sanitation District 1 of Specification No.FR12-003
Return W Aoenda Rworl
1.6 The term "days", when used in the Contract, shall mean calendar days, unless otherwise
noted as business days.
1.7 The term "hours", when used in this Contract, shall be as defined in Exhibit"A°
1.8 Contractor shall provide OCSD with all required premiums and/or overtime work at no
charge beyond the price provided under"Compensation" below. -
1.9 Except as expressly provided otherwise, OCSD accepts no liability for any expenses, _
losses, or action incurred or undertaken by Contractor as a result of work performed in
anticipation of purchases of said services by OCSD.
2. Compensation Compensation for this project shall not exceed the total amount of
Three Hundred Thirty-eight Thousand and 00/00 Dollars ($338,000.00).
3. Payments Payments shall be made monthly upon approval by OCSD Project Engineer,
Chuck Hodge or his designee, of invoices submitted for work completed as described in Exhibit
"A". OCSD, at its sole discretion, shall be the determining party as to whether the tasks and
deliverables have been satisfactorily completed.
4. Invoices
4.1 OCSD shall pay within 30 days of completion and receipt and approval by OCSD Project
Engineer of an itemized invoice, in a form acceptable to OCSD to enable audit of the charges
thereon. Contractor shall not pay less than the prevailing wage, if applicable. Invoices shall
include the Purchase Order Number.
5. Audit Rights Contractor agrees that, during the term of this Contract and for a period of
three (3) years after its termination, OCSD shall have access to and the right to examine any
directly pertinent books, documents, and records of Contractor relating to the invoices submitted by Contractor pursuant to this Contract.
5.1 Invoices shall be emailed by Contractor to OCSD at the following email address and the
Purchase Order number shall be referenced in the subject line: APStaffaOCSD.com.
6. Scope of Worn Subject to the terms of this Contract, Contractor shall perform the
Services identified in Exhibit "A". Contractor shall perform said Services in accordance with
generally accepted industry and professional standards.
7. Moddications to Scope of Work Requests for modifications to the Scope of Work
hereunder can be made by OCSD at any time. All modifications must be made in writing and
signed by both Parties.
& Contract Term The Services provided under this Contract shall be completed within
120 days from the date of notice to proceed.
9. Performance Time is of the essence in the performance of this Contract and the
provisions hereof.
10. Force Majeure Neither party shall be liable for delays caused by accident, flood, acts of
God, fire, labor trouble, war, acts of government or any other cause beyond its control, but said
party shall use reasonable efforts to minimize the extent of the delay. Work affected by a Force
Majeure condition may be rescheduled by mutual consent or may be eliminated from the
Contract.
Orange County Sanitation District 2 of 7 Specification No.FR12-003
Return to Aoenda Reporl
11. Termination
11.1 OCSD reserves the right to terminate this Contract for its convenience, with or without
cause, in whole or in part, at any time, by written notice from OCSD, (delivered by certified mail,
return receipt requested) of intent to terminate. Upon receipt of a termination notice, Contractor
shall immediately discontinue all work under this Contract (unless the notice directs otherwise).
OCSD shall thereafter, within thirty (30) days, pay Contractor for work performed (cost and fee)
to the date of termination. Contractor expressly waives any claim to receive anticipated profits to
be earned during the uncompleted portion of this Contract. Such notice of termination shall
terminate this Contract and release OCSD from any further fee, cost or claim hereunder by
Contractor other than for work performed to the date of termination.
11.2 OCSD reserves the right to terminate this Contract immediately upon OCSD's
determination that Contractor is not meeting specification requirements, if the level of service is
inadequate, or any other default of this Contract.
11.3 OCSD may also immediately cancel for default of this Contract in whole or in part by
written notice to Contractor:
• if Contractor becomes insolvent or files a petition under the Bankruptcy Act; or
• if Contractor sells its business; or
• if Contractor breaches any of the terms of this Contract; or
• if total amount of compensation exceeds the amount authorized under this Contract.
11.4 All OCSD property in the possession or control of Contractor shall be returned by
Contractor to OCSD upon demand, or at the termination of this Contract,whichever occurs first.
12. Insurance Contractor and all subcontractors shall purchase and maintain, throughout
the fife of this Contract and any periods of warranty or extensions, insurance in amounts equal
to the requirements set forth in the signed Acknowledgement of Insurance Requirements -
(attached hereto and incorporated herein as Exhibit "C"). Contractor shall not commence work
under this Contract until all required insurance is obtained in a form acceptable to OCSD, nor
shall Contractor allow any subcontractor to commence service pursuant to a subcontract until all
insurance required of the subcontractor has been obtained. Failure to maintain required -
insurance coverage shall result in termination of this Contract.
13. Bonds
13.1 Contractor shall, before entering upon the performance of this Contract, furnish bonds
(attached hereto in Exhibit °D") approved by OCSD's General Counsel - one in the amount of
one hundred percent (100%) of the Contract price bid, to guarantee the faithful performance of
the work, and the other in the amount of one hundred percent (100%) of the Contract price bid,
to guarantee payment of all claims for labor and materials furnished. This Contract shall not
become effective until such bonds are supplied to and approved by OCSD. Bonds must be
issued by a surety authorized by the State Insurance Commissioner to do business in California
and must be maintained throughout the fife of the project and during the warranty period.
13.2 Contractor is hereby notified that it is required that the person executing the Bonds must
have on file with the County Clerk, County of Orange, a Power of Attorney and authorization to
execute said Bonds for and on behalf of the corporate surety. The purpose of this requirement
is to insure that the provisions of Code of Civil Procedure Section 995.630 requiring such
authority to be on file with the Orange County Clerk are satisfied in order for the OCSD and Its
officers to approve the bond.
Orange County Sanitation District 3 of 7 Specification NO.FR12-003
Return to Aoenda Renod
14. Indemn/ftcadon and Hold Harmless Provision Contractor agrees to save, indemnify,
defend and hold harmless OCSD against any and all liability, claims, judgments, cost and
demands, including demands arising from injuries or death of persons and damage to property,
arising directly or indirectly out of the negligence or willful misconduct of Contractor, its
employees or agents, in relation to the rendition of services pursuant to this Contract, except
claims or litigations arising through the sole negligence or willful misconduct of OCSD.
Contractor agrees to reimburse OCSD for any expenditure, including reasonable attorney's
fees, OCSD may incur by reason of such matters, and, if requested by OCSD, will defend any
such suits at the cost and expense of Contractor.
15. Safety and Human Resources MR) Policies OCSD requires all contractors and
service providers to follow and ensure their employees and all subcontractors follow all State
and Federal regulations as well as OCSD requirements while working at OCSD locations. If
during the course of a contract it is discovered that OCSD policies, safety manuals, or contracts
do not comply with State or Federal regulations then the Contractor is required to follow the
most stringent regulatory requirement at no cost to OCSD. Contractor and all their employees ..
and subcontractors, shall adhere to all applicable OCSD Safety, Human Resources, and
Chemical Delivery Procedures found at: OCSD.com, "Doc Central' (bottom of page), under
"Safety" (see Exhibit "B" hereto).
16. Warranty
16.1 Manufacturer's standard warranty shall apply. All manufacturer warranties will begin at
date of completion of this Contract.
16.2 Contractor's warranty: If, within the 12-month period following completion of its Services, _
OCSD informs Contractor that any part of the Services fails to meet the standards required
under this Contract, Contractor shall, within the time agreed to by OCSD and Contractor, take _
all such actions as are necessary to correct or complete the noted deficiency(ies).
17. Familiarity with Work By executing this Contract, Contractor warrants that: 1) it has
investigated the work to be performed; 2) it has investigated the site of the work and is aware of
all conditions there; and 3) it understands the facilities, difficulties and restrictions of the work
under this Contract. Should Contractor discover any latent or unknown conditions materially -
differing from those inherent in the work or as represented by OCSD, it shall immediately inform
OCSD of this and shall not proceed, except at Contractor's risk, until written instructions are
received from OCSD.
18. Reaulatory Requirements Contractor shall perform all work under this Contract in
strict conformance with applicable federal, state, and local regulatory requirements including,
but not limited to, 40 CFR 122, 123, 124, 257, 258, 260, and 261, Title 22, 23, and Califomia
Water Codes Division 2.
19. Licenses, Permits. Ordinances and Reauladons Contractor represents and warrants
to OCSD that it has obtained all licenses, permits, qualification and approvals of whatever
nature that are legally required to engage in this work. Any and all fees required by State,
County, City and/or municipal laws, codes and/or tariffs that pertain to work performed under the
terms of this Contract will be paid by Contractor.
20. Applicable Laws and Reauladons Contractor shall comply with all applicable federal,
state, and local laws, rules, and regulations. Contractor also agrees to indemnify and hold
harmless from any and all damages and liabilities assessed against OCSD as a result of
Contractor's noncompliance therewith. Any permission required by law to be included herein
shall be deemed included as a part of this Contract whether or not specifically referenced.
Orange County Sanitation District 4 of 7 Specification No.FR12-003
Return to Aoenda Renod
21. Public Contracts Law OCSD has been advised by the State of California Director of
Industrial Relations of its determination of the general prevailing rate of per diem wages and the
general prevailing rate for legal holiday and overtime work in the locality in which the work is to
be performed for each craft or type of work needed to execute this Contract. Contractor agrees
that not less than said prevailing rates shall be paid to workers employed on this project as
required by Labor Code Section 1774 of the State of California.
22. Govemina Law This Contract shall be governed by and interpreted under the laws of
the State of California and the Parties submit to jurisdiction in Orange County, in the event any
action is brought in connection with this Contract or the performance thereof.
23. Breach The waiver of either party of any breach or violation of, or default under, any
provision of this Contract, shall not be deemed a continuing waiver by such party of any other
provision or of any subsequent breach or violation of this Contract or default thereunder. Any
breach by Contractor to which OCSD does not object shall not operate as a waiver of OCSD's
rights to seek remedies available to it for any subsequent breach.
24. Remedies In addition to other remedies available in law or equity, if the Contractor fails
to make delivery of the goods or Services or repudiates its obligations under this Contract, or if
OCSD rejects the goods or Services or revokes acceptance of the goods or Services, OCSD
may (1) cancel the Contract; (2) recover whatever amount of the purchase price OCSD has
paid, and/or (3) 'cover' by purchasing, or contracting to purchase, substitute goods or Services
for those due from Contractor. In the event OCSD elects to "cover' as described in (3), OCSD
shall be entitled to recover from Contractor as damages the difference between the cost of the
substitute goods or Services and the contract price, together with any incidental or
consequential damages.
25. Dispute Resolution
25.1 In the event of a dispute as to the construction or interpretation of this Contract, or any
rights or obligations hereunder, the Parties shall first attempt, in good faith, to resolve the
dispute by mediation. The Parties shall mutually select a mediator to facilitate the resolution of
the dispute. If the Parties are unable to agree on a mediator, the mediation shall be conducted
in accordance with the Commercial Mediation Rules of the American Arbitration Agreement, -
through the alternate dispute resolution procedures of Judicial Arbitration through Mediation
Services of Orange County ("JAMS"), or any similar organization or entity conducting an
alternate dispute resolution process.
25.2 In the event the Parties are unable to timely resolve the dispute through mediation, the
issues in dispute shall be submitted to arbitration pursuant to California Code of Civil Procedure,
Part 3, Title 9, Sections 1280 at seq. For such purpose, an agreed arbitrator shall be selected,
or in the absence of agreement, each party shall select an arbitrator, and those two arbitrators
shall select a third. Discovery may be conducted in connection with the arbitration proceeding
pursuant to California Code of Civil Procedure Section 1283.05. The arbitrator, or three
arbitrators acting as a board, shall take such evidence and make such investigation as deemed
appropriate and shall render a written decision on the matter in question. The arbitrator shall
decide each and every dispute in accordance with the laws of the State of California. The
arbitrators decision and award shall be subject to review for errors of fact or law in the Superior
Court for the County of Orange, with a right of appeal from anyjudgment issued therein.
25. Aftomevrs Fees If any action at law or inequity or if any proceeding in the form of an
Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this
Contract, the prevailing party shall be entitled to reasonable attorney's fees, costs and
necessary disbursements in addition to any other relief to which he may be entitled.
Orange County Sanitation District 5 of 7 Specification No.FR12-003
Return to Aoenda Renod
27. Survival The provisions of this Contract dealing with Payment, Warranty, and Forum for
Enforcement, shall survive termination or expiration of this Contract.
28. Severability If any section, subsection, or provision of this Contract, or any agreement
or instrument contemplated hereby, or the application of such section, subsection, or provision
is held invalid, the remainder of this Contract or instrument in the application of such section,
subsection or provision to persons or circumstances other than those to which it is held invalid,
shall not be affected thereby, unless the effect of such invalidity shall be to substantially
frustrate the expectations of the Parties.
29. Damage to OCSD s Property Any of OCSD's property damaged by Contractor, any
subcontractors or by the personnel of either will be subject to repair or replacement by
Contractor at no cost to OCSD.
30. Freight(F.O.B. Destination) Contractor assumes full responsibility for all transportation,
transportation scheduling, packing, handling, insurance, and other services associated with -
delivery of all products deemed necessary under this Contract.
31. South Coast Air Quality Manaaement District's (SCAQMD) Requirements It is
Contractor's responsibility that all equipment furnished and installed be in accordance with the
latest rules and regulations of the South Coast Air Quality Management District(SCAQMD). All
contract work practices, which may have associated emissions such as sandblasting, open field
spray painting or demolition of asbestos containing components or structures, shall comply with
the appropriate rules and regulations of the SCAQMD.
32. Disclosure Contractor agrees not to disclose, to any third party, data or information
generated from this project without the prior written consent from OCSD. _
33. Limitations upon Subcontractina and Assignment Contractor shall not delegate any
duties nor assign any rights under this Contract without the prior written consent of OCSD. Any
such attempted delegation or assignment shall be void.
34. Third Party Rights Nothing in this Contract shall be construed to give any rights or -
benefits to anyone other than OCSD and Contractor.
35. Read and Understood By signing this Contract, Contractor represents that he has read
and understood the terms and conditions of the Contract.
36. Authority to Execute The persons executing this Contract on behalf of the Parties
warrant that they are duly authorized to execute this Contract and that by executing this
Contract, the Parties are formally bound.
37. Entire Contract This Contract constitutes the entire agreement of the Parties and
supersedes all prior written or oral and all contemporaneous oral agreements, understandings,
and negotiations between the Parties with respect to the subject matter hereof.
Orange County Sanitation Dishfct 6 of 7 Specification No.FR12-003
Return to Aaenda Reood
38. Notices All notices under this Contract must be in writing. Written notice shall be sent
by registered or certified mail, postage prepaid, return receipt requested, or by any other
overnight delivery service which delivers to the noticed destination and provides proof of
delivery to the sender. All notices shall be effective when first received at the following
addresses:
OCSD: Clarice M. Marcin
Senior Contracts Administrator
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708-7018
Contractor: Mode Engineering
IN WITNESS WHEREOF, the Parties hereto have hereunto set their hands the day and year
indicated below.
ORANGE COUNTY SANITATION DISTRICT
Dated. By:
Chair Board of Directors
Dated: By:
Clerk of the Board
Dated: By:
Contracts/Purchasing Manager
MODE ENGINEERING
Dated: By:
Print Name and Title of Officer
IRS Employer's I.D. Number
Orange County Sanitation District 7 of 7 Specification No.FR12-003
OPERATIONS COMMITTEE Neetingoate TOeA.O r.
10/02/2013 30/23/13
AGENDA REPORT em Number Item Numbe
6 11
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Kanetis, Director of Engineering
Project Manager: Ted Vitko
SUBJECT: OCEAN OUTFALL ASSESSMENTS, PROJECT NO. SP-187
GENERAL MANAGER'S RECOMMENDATION
Approve Revision No. 1 to the Black & Veatch PLAN2010-01, Task Order 05 (Ocean
Outfall Assessments, Project No. SP-187), in the amount of $19,569 for additional
engineering services to develop Ocean Outfall Booster Station refurbishment scope of
work items, for a total amount not to exceed $67,593.
SUMMARY
Black and Veatch was awarded a PLAN2010 study contract for $48,024 to analyze the
hydraulic performance and stability of the current Ocean Outfall Booster Station (OOBS)
at Plant No. 2. The study analyzed four operating scenarios for future flow projections
and refurbishment strategies. An outcome of the study included a realization of an
unexpected operating condition as a result of increasing GWRS water diversion and
decreased incoming flows that will potentially cause cavitation of the existing pumps.
Staff has worked with Black and Veatch to craft a new pumping arrangement to address
this additional operating condition which may result in improved operational efficiencies.
The new arrangement will potentially have three positive effects. It is expected to
reduce the cost of upcoming Ocean Outfall System Rehabilitation project, Project
No. J-117, scheduled to begin in early 2014, reduce operation and maintenance costs
(principally electrical usage savings), and improve reliable operation of the station in
normal and storm flow scenarios.
Staff is requesting an additional $19,569 for Black and Veatch to develop a planning
scenario including updated hydraulic analysis, preliminary pump selection and layout,
preliminary electrical requirements and layout, and updated cost and schedule
estimates. This planning scenario will become the project basis for upcoming Project
No. J-117, Ocean Outfall System Rehabilitation.
This Revision No. 1 requires Board approval because Black & Veatch PLAN2010-01,
Task Order 05, was originally awarded under the PLAN2010 procurement program
which allows for engineering study task orders with a value of $50,000 or less to be
awarded to one of five preselected consulting firms. The PLAN2010 preselection
process publicly solicited proposals from interested firms, evaluated qualifications of
Page 1 of 2
responding firms, made Board approved selections, and set pricing and other
commercial terms for each of the five consultants. This amendment will push the value
beyond the $50,000 limit creating the need for Board Appoval.
PRIOR COMMITTEE/BOARD ACTIONS
March 2013 —Task Order 05 awarded under the PLAN 2010 procurement program.
December 2010 — Board approved a PCSA with Black & Veatch and a number of other
firms to provide planning studies on a task order basis for two-year term, etc. and
approved an exception to Resolution No. OCSD 07-04 Section 4.05, authorizing the
General Manager to select any single suitable firm in the Planning Studies Program for
a particular task order valued at $50,000 or less, without having to solicit proposals from
multiple firms.
ADDITIONAL INFORMATION
None.
CEQA
This is not considered a project under CEQA.
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
This request complies with authority levels of the Sanitation District's Delegation of
Authority. This item has been budgeted for FY 2012-13 and FY 2013-14 (section 8,
page 10) as Project No. SP-187, Plant No. 2 Outfall Systems Asset Management Plan,
for $300,000.
Date of Approval Contract Amount Contingency
10/24/12 $48,024 0%
10/23/13 (Revision No. 1) $19,569 0%
Total Proposed Order $67,593
ATTACHMENTS
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the
complete agenda package:
1. Original Task Order No. 5
2. Revision No. 1 to Task Order No. 5
3. Attachment G (Cost Matrix)
TV:sa:gc
Page 2 of 2
'4 Return to Aaenda Report
AGREEMENT NO. PLAN2010-01 7
TASK ORDER OS .
SP-187,OCEAN OUTFALL ASSESSMENTS
Task Order 05,SP-187,Ocean Outfall Assessments under Agreement No.PLAN2010-01("AGREEMENT)
for ON-CALL PLANNING STUDIES between the ORANGE COUNTY SANITATION DISTRICT("SANITATION
DISTRICT")and BLACK&VEATCH ("CONSULTANT'),has been assigned to CONSULTANT in accordance
with Attachment"8"to the AGREEMENT.
CONSULTANrs proposal,consisting of Black&Veatch's Proposal&Scope of Work dated March 5,2013
is attached,and hereby incorporated into and made a part hereof this Task Order 05.
COMPENSATION: The Not-to-Exceed amount for this Task Order 05 is$48,024.
CONSULTANT shall submit its invoices for this Task Order 05 in accordance with the requirements of
Section 2. COMPENSATION,Attachment"C'Billing Rates,and Attachment"D"Allowable Direct Costs
ofthe AGREEMENT. Costs for the work included in this Task Order 05 shall be invoiced separately from
costs for work included In any subsequently issued Task Orders.
AUTHORIZED AGREEMENT AMOUNT: $ 700,OD0.00
SUMMARY OF TASK ORDERS:
Authorized Agreement Amount: $ 70D,000.00 (Current Contract Year)
Less This Task Order 05: $ 48,024.00
Remaining Authorized Amount: $ 651,976
CATEGORYI TASK ORDER SUMMARY
TASK TASK OR DER DESCRIPTION TASK ORDER AMOUNT
ORDER
05 SP-187,Ocean Outfall Assessments $48,024.00
Task OrAer05—SP-18),Ocean q,Nallnssevments ,lg .e N.PIanM1D01
EDW:0034 M
Pa Iat2
�S Return to Aaentla Report
SCOPE OF SERVICES: Refer to CONSULTANT's proposal for this Task Order 05,which is attached.
DELIVERABLES: Project deliverables shall be submitted to the Orange County Sanitation District,
to the attention of Mr.Gary Conklin,Senior Engineer.
SCHEDULE: All Work to be completed within 6 months of Notice to Proceed,in accordance
with CONSULTANT's proposal.
EFFECTIVE DATE: This Task Order 05 shall be effective as ofthe date of SANITATION DISTRICT's
General Manager's signature below.
NOTICE TO PROCEED: The date upon which CONSULTANT executes this Task Order 05 shall serve as
the Notice to Proceed date.
All terms and conditions ofthe AGREEMENT shall remain in full force and effect. It is the intent ofthe
SANITATION DISTRICT and CONSULTANT to incorporate this Task Order 05 into the AGREEMENT in a
forthcoming amendment.
Mmes D. Ruth Date
General Manager
Orange County Sanitation District
'545 -20%3
Date
Black&Veatch Corporation
Ta#Oraer¢S—SP-]8>,Ocean OuNall Acwsunents Rpeement No.PlanNa l
mM5:0034)1388
Pai$2af 3
Return to Mende Report
6.
BLACKS;VETCH
EPERDY WVER IXipRYATIpM 6RVFRXYEPE
Orange County Sanitation District
Ocean Outfall Assessments
Contract: SP-197 Match 5, 2013
Ted Vitko
Orange County Sanitation District
10944 Ellis Avenue
Fountain Valley,CA 92728-8127
Subject: SP-187-Ocean Outfall Assessments
Pee Proposal
Per your request,Black&Veatch is pleased to provide this fee proposal to perform the scope of
work as described below.
SCOPE OF WORK
The tasks below describe the specific tasks that will be performed as partof the SP-197 Ocean
Outfall Assessment Project.
TASK 1 -HYDRAULIC ANALYSIS
1.1 Update Existing Model
Update the Northwest Hydraulics'EPASWMM models to htfoWorks Version 13,and
add the following facilities:
• Piping between Plant I and Plant 2 schematically(Detatiled hydraulics of the piping
will not be included in the model)
• OOBS: wet wells,overflow box and Santa Ana River(SAR) outfall pipelines,
junction box,pumps,force main to Surge Tower 2 and bypass to Surge Tower 1
• Junction Box A SAR outfafl pipelines and Surge Tower 2:gravity bypass line
• EPSA:pumps and force mains
• Surge Tower 2 and Long Outfall
• Surge Tower 1 and Short Outfall
It is assumed that OCSD will provide all pertinent as-built information requested in a
timely manner.
1.2 Analysis
Update the model with OCSD identified flow conditions and extended period
simulations,calibrate the model to a typical high tideflow and low tide flow condition,
evaluate;up to seven typical operation strategies that focus on identifying potential
Bhda WR Cpipwe -15615A PRr ",suds=-W .CeawNe M18 USA-T&0.9 753-0 -r-Rx B4&]53W
Return to Agenda Report
SP-187 March 5, 2013
Ocean Outfall Assessments Page 3
2.2 Pump Station Layout
• Provide a one preliminary(concept level)layout of the pump station
including piping,pumps,and valves
2.3 Deliverables
• Pump curves
• One preliminary pump station layout
• List of major equipment
TASK 3—ELECTRICAL REOUIREMENTS AND LAYOUT
3.1 Electrical Equipment
• Based on pump selection recommended in Task 2 select appropriate
electrical equipment including VFD's, switch gear, etc.
3.2 Electrical Layout
• Recommend a location(most likely down stairs)and provide a one
preliminary layout for the electrical equipment
33 Deliverables
• One preliminary layout for the electrical equipment
• List of major equipment
TASK 4—CONSTRUCTABII,ITY AND SCHEDULE
4.1 Constructability
• Review concept drawings and develop a construction phasing scenario
that allows the pump station to stay in operation
4.2 Schedule
• Review concept drawings and develop a construction schedule that
allows the pump station to stay in operation
43 Deliverables
• Construction phasing memo
• Construction schedule
TASK 5—Proiect Coordination
5.1 Prepare a technical memorandum(TM)summarizing the results of the tasks
identified above.The TM will include a brief summary of the tasks described
NA1375MrwlcesXOc SPIP 0.Ou1 Assru w03042013.do
Return to Mends Report
BLACK�&�VEATCH
Iwuan a
EMEfl9M. Vj11. N'.AIATI On 49VFN%ka.ENl
SR-18i
Ocean Outfail Assessments tabor and Fee Estimate
Ted xoc a-g McAa .
Jee6ara la�naz: /nantla
Ask 5lol mk M4C try A.dle Mp h.mar Vlctor Fsl Mmn/CA tiPAct Tapt Tot9l
YOleeC
a�'vi�n P 5[YaYee' Rty say& tuww. E,e2Yiul [1-d m egl E neer 0 Ex/Xlbp lours 1ptM YtheJlba[
'Mat�aBtr SeMyr9i% En&leeeE
Spec+aNsK 3pttW3t lead lieitl
4
AaCe 36UA 25]5 2110 1] 7 15<.5 1800 426A P50 42.0.
Ca9 t1-133UPa§f w a aso 1 S'11.896 52R858
U
r" I
�f.Po and Geytiut S5,P14 $4013.
SokMibn
TMk3-flen}ieyt
K yiS2mems and 2 40 3 9 5; $8,135 591535
L,.
Taska-.
ermsewranplrn¢w 1 2 1d sd 5z,7os $2,We
542uduk
rpt._F pan 14 a. e a 8 H ;8A a4 $B,ai7 "457
$ewdinmim
Tme1 $W5 SLOW $an 53zo1b $7,724 52,3su $W,059 . 5700 $2,a 7 5850 ]si $al,na $aa M4
Bieck&fttc CW..fi.l15515 Aten Pa,",Stike300. mna,C"'fornta 9318 USA,Telpfroh6999-7$3-0500-FU 949753-1252
Return to Mande Report
AGREEMENT NO. PLAN2010-01
REVISION 1 TO
TASK ORDER 05
SP-187,OCEAN OUTFALL ASSESSMENT
Task Order 05—SP-187,Ocean Outfall Assessment under Agreement No.PLAN2010-01("AGREEMENT)
for ON-CALL PLANNING STUDIES between the ORANGE COUNTY SANITATION DISTRICT('SANITATION
DISTRICT")and BLACK&VEATCH("CONSULTANT")is hereby revised as follows:
COMPENSATION: The Not-to-Exceed amount for this Revision 1 to Task Order No. 05 is increased
by$19,569.00 for a revised not to exceed amount of$67,593.00.
CONSULTANT shall submit its invoices for this Revision 1 to Task Order 05 in accordance with the
requirements of the Agreement,Section 2. COMPENSATION, Attachment"C'Billing Rates,and
Attachment"D"Allowable Direct Costs of the AGREEMENT. Costs for the work included in this Task
Order 05 shall be invoiced separately from costs for work included in any subsequently issued Task
Orders.
AUTHORIZED AGREEMENT AMOUNT: $ 700,000.00[Unchanged]
SUMMARY OF TASK ORDERS:
Authorized Agreement Amount: $ 700,000.00
Previously Issued Task Orden: 0.00
Less This Task Order 05: $ 48,024.00
Remaining Authorized Amount: $ 651,976.00
Less Revision 1 to Task Order 05: $ 19,569.00
$ 632,407.00
CATEGORY III TASK ORDER SUMMARY
CUMULATIVE
TASK TASK ORDER CATEGORY III
ORDER TASK ORDER DESCRIPTION AMOUNT TASK ORDERS
05 SP-187,Ocean Outfall Assessment $49,024.00 $48,024.00
05 Rev.1 SP-187,Ocean Outfall Assessment $19,569.00 $67,593.00
Increase in Scope of Work
Perisim 1 to TaskO roS—SP-W,Ocean 0u 11 Assessment Agreement No.PbnWa u
EDN&-
Page 1 of 2
Return to Agenda Report
SCOPE OF SERVICES: Refer to CONSULTANT's proposal under Task Order 05. [Changed]
DELIVERABLES: Project deliverables remain as described under Task Order 05. [Unchanged]
SCHEDULE: All Work to be completed by approximately 6 months of Notice to Proceed, as
described under Task Order 05. [Unchanged]
EFFECTIVE DATE: This Revision 1 to Task Order 05 shall be effective as of the date of SANITATION
DISTRICT's Operations Committee Chairman's signature below.
All terms and conditions of the AGREEMENT shall remain in full force and effect. It is the intent of the
SANITATION DISTRICT and CONSULTANT to incorporate this Task Order 05, inclusive of all revisions,into
the AGREEMENT in a forthcoming amendment.
Chair, Board of Directors Date
Orange County Sanitation District
Black&Veatch Date
Revision 1 to Task Order 05—SP-187,Ocean Outrall Assessmem Agreement Me.Plan201"l
EMS:
Page 2 or2
Return to Aaenda Report
ATTACHMENT G
COST MATRIX
BLACK & VEATCH CORPORATION
Additional Scope - Cost Estimate - OOBS Rehabilitation
SP-187
M[ FillillillilllF— Mechanical
Lead
Project Hydraulic Modeling Electrical Project Project
Task Description Manager Specialist Specialist Lead Engineer Engineer CAD Total Hours
Berk Stolinski McCarty Kindle Jayakumar Burns Admin/CAD
Billing Rate
Hrs Hrs Hrs Hrs Hrs Hrs Hrs
1 Task 1-Hydraulic Analysis
1.1 Model Update 0 0 6 0 0 5 0 11
1.2 Hydraulic Analyses 0 2 6 0 0 5 0 13
1.3 Deliverables 0 0 0 0 0 2 0 2
Subtotal 0 2 12 0 0 12 0 26
2 Task 2-Pump Selection and Layout
2.1 Pump Station Equipment Selection 0 0 0 0 8 0 0 8
2.2 Pump Station Layout 0 0 0 0 8 0 6 14
2.3 Deliverables 0 0 0 0 0 0 0 0
Subtotal 0 0 0 0 16 0 6 22
3 Task 3 -Electrical Selection and Layout
3.1 Electrical Equipment Selection 0 0 0 10 0 0 0 10
3.2 Electrical Layout 0 0 0 10 1 0 6 17
3.3 Deliverables 2 0 0 10 2 0 0 14
Subtotal 2 0 1 0 30 1 3 0 1 6 41
4 Task 4-Constructabilty and Schedule
4.1 Constructability 0 0 0 1 2 0 0 3
4.2 Schedule 0 0 0 1 2 0 0 3
4.3 Deliverables 2 0 0 0 2 0 0 4
Subtotal 2 0 0 2 6 0 0 10
5 Task 5- Pro-ec[Management
5.1 Technical Memorandum 1 0 2 2 2 0 0 7
5.2 Meetings 2 0 2 2 2 0 2 10
5.3 Pro ect Management 1 0 0 0 0 0 2 3
Subtotal 4 0 4 4 4 0 4 20
Total 1 $ 2,398 $ 422 $ 2,927 $ S,561 $ 5,220 $ 1,509 $ 1,631 $ 19,569
BLACK VEATCH CORPORATION I Labor and Fee Page 1
Return to Aaenda Remo
FEE PROPOSAL FORM
BLACK&VEATCH CORPORATION
Pre-Work for OOBS Rehabilitation
PROJECT NO.SP-182
Consultant: Black&Veatch Corporation
Raw Labor $5,758
Fringe Rate
50.7% $2,920
Burdened Labor(Raw+ Fringe) $8,678
Overhead
105.0% $9,112
Subtotal (Burdened Labor+
Overhead) $17,790
Profit
10.00% $1,779
Total Direct Costs Not to Exceed
Total Consultant Design Services not to exceed $19,569
Subconsultant: Debbie Burris
Subconsultants Under$100,000
$o
Total Subconsultants under$100,000 not to Exceed $0
Project Grand Total $19,569
OPERATIONS COMMITTEE Meeting Dare TOBA.Of DIr.
10/02/13 10/23/13
AGENDA REPORT ern Number Item Nu bar 2
7 1
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Kanetis, Director of Engineering
CIP Project Manager: Wendy Sevenandt
SUBJECT: BOILER SYSTEM REHABILITATION AND SCRUBBERS H & I
DEMOLITION AT PLANT NO. 2, PROJECT NO. P2-106
GENERAL MANAGER'S RECOMMENDATION
A. Approve a Professional Consultant Services Agreement with Dudek &
Associates, Inc. to provide construction support services for Boiler System
Rehabilitation and Scrubbers H & I Demolition at Plant No. 2, Project No. P2-106,
for an amount not to exceed $222,503; and,
B. Approve a contingency of$22,250 (10%).
SUMMARY
Boiler System Rehabilitation and Scrubbers H & I Demolition at Plant No. 2, Project
No. P2-106 will replace feedwater and burner systems at the existing boilers at Plant
No. 2 and demolish H & I Scrubbers including associated equipment, ductwork, piping,
and electrical systems. Dudek & Associates, Inc. (Dudek) is providing engineering
services for this project.
Dudek has satisfactorily furnished engineering services for the design of Project
No. P2-106 and their engineering support services are needed during construction to
provide continuity through the completion of the project. The proposed construction
services will include reviewing submittals, answering Contractor's requests for
information, reviewing design changes, attending meetings, making site visits, preparing
testing procedures, witnessing a factory demonstration test, reviewing commissioning
plans, preparing Operations Manuals and Procedures (OMaP), preparing record
drawings, and assisting in closeout of the project.
Staff negotiated with Dudek for these support services in accordance with the Orange
County Sanitation District's (Sanitation District) adopted policies and procedures. A
review of the proposed price was conducted using estimated quantities of requests for
information, submittals, meetings, site visits, change order review, and design revisions,
as well as the level of effort to participate in pre-commissioning and commissioning
tasks, to prepare record drawings, and to prepare OMaP. Based on this review, staff
determined the negotiated fee to be fair and reasonable for these services. Staff
Page 1 of 3
recommends awarding a Professional Consultant Services Agreement with Dudek for
an amount not to exceed $222,503, and approving a contingency of$22,250 (10%).
PRIOR COMMITTEE/BOARD ACTIONS
June 2013 — Authorized staff to enter into negotiations with Dudek for construction
support services for Boiler System Rehabilitation and Scrubbers H & I Demolition at
Plant No. 2, Project No. P2-106.
August 2012 - Approved a name change for Project No. P2-106 from "Chemical
Scrubber Conversions and Piping System Improvements" to 'Boiler System
Rehabilitation and Scrubbers H & I Demolition at Plant No. 2."
ADDITIONAL INFORMATION
The original Professional Design Services Agreement (PDSA) had three tasks:
1. Replace the dewatering building plant water booster pumps
2. Upgrade the boiler feedwater system
3. Convert one chemical scrubber to a biotrickling filter scrubber and modify some
existing biotrickling filter scrubbers.
As other capital projects were developed, items 1 and 3 were incorporated into other
projects and two headworks chemical scrubbers at Plant No. 2 were decommissioned,
but not demolished. Also, new State regulations were enacted for air quality
requirements that had to be implemented for the boilers by 2015.
The project scope was modified to eliminate further work on the booster pumps and
biotrickling filters, to add the replacement of boiler burners to meet the new State air
quality regulations, and to demolish the two decommissioned scrubbers. Another small
project was subsequently incorporated into this project to bring the status signals from
the boiler facility to the Operations Center, thus reducing the amount of rounds the
operators have to conduct at the boiler facility.
The original PDSA entered into in 2010 included construction support services at a
value of $54,532. The construction support services budget included in the PDSA, as
well as the approved contingency, were reallocated under the General Manager's
authority to accomplish the engineering work needed to design the scope changes.
This original value of $54,532 would be insufficient for the current construction services
scope of work. Entering into a new Professional Construction Services Agreement
follows current procedures in which the Sanitation District enters into new agreements
with Consultants for construction phase services.
Page 2 of 3
CEQA
A Notice of Exemption was filed and recorded on August 24, 2006.
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
This request complies with authority levels of the Sanitation District's Delegation of
Authority. This item has been budgeted (Line item: FY 2013-14 Update, Page A-10)
and the budget is sufficient for the recommended action.
Date of ADDroval Contract Amount Contingency
10/23/13 $222,503 $22,250 (10%)
ATTACHMENT
The following attachments) maybe viewed on-line at the OCSD website (www.ocsd.com) with the
complete agenda package:
Professional Consultant Services Agreement
NK:DF:WS:dm:gc
Page 3 of 3
Return to Mends Report
PROFESSIONAL CONSULTANT SERVICES AGREEMENT
THIS AGREEMENT, is made and entered into to be effective the 23rd day of October,
2013 by and between the ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to
as "SANITATION DISTRICT", and DUDEK, for purposes of this Agreement hereinafter referred
to as"CONSULTANT".
WITNESSETH:
WHEREAS, the SANITATION DISTRICT desires to engage a CONSULTANT to provide
Construction Support Services for Boiler System Rehabilitation and Scrubbers H & I
Demolition at Plant No. 2, Project No. P2.106; and,
WHEREAS, CONSULTANT is qualified to provide the necessary services for
Construction Support Services in connection with these requirements; and,
WHEREAS, the SANITATION DISTRICT has adopted procedures in accordance with
the Delegation of Authority(DOA) Section 5.7 (f) and (g)for the selection of Construction
Support Services and has proceeded in accordance with said procedures to perform this work;
and,
WHEREAS, at its regular meeting on October 23, 2013 the Board of Directors, by Minute
Order, accepted the recommendation of the Operations Committee pursuant to Resolution No.
OCSD 07-04 to approve this Agreement between the SANITATION DISTRICT and
CONSULTANT.
NOW, THEREFORE, in consideration of the promises and mutual benefits, which will
result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows:
7. SCOPE OF WORK
CONSULTANT agrees to furnish necessary professional and technical services to
accomplish those project elements outlined in the Scope of Work attached hereto as
"Attachment A", and by this reference made a part of this Agreement.
A. The CONSULTANT shall be responsible for the professional quality, technical
accuracy, completeness, and coordination of all design, drawings, specifications,
and other services furnished by the CONSULTANT under this Agreement,
including the work performed by its Subconsultants. Where approval by the
SANITATION DISTRICT is indicated, it is understood to be conceptual approval
only and does not relieve the CONSULTANT of responsibility for complying with
all laws, codes, industry standards and liability for damages caused by errors,
omissions, noncompliance with industry standards, and/or negligence on the part
of the CONSULTANT or its Subconsultants.
B. CONSULTANT is responsible for the quality of work prepared under this
Agreement and shall ensure that all work is performed to the standards of best
engineering practice for clarity, uniformity, and completeness.
PCSA PROJECT NO. P2-106
Revised 07/29/13
Page 1 of 17
C. In the event that work is not performed to the satisfaction of the SANITATION
DISTRICT and does not conform to the requirements of this agreement or any
applicable industry standards, the CONSULTANT shall, without additional
compensation, promptly correct or revise any errors or deficiencies in its designs,
drawings, specifications, or other services within the timeframe specified by the
Project Engineer/Project Manager. The SANITATION DISTRICT may charge to
CONSULTANT all costs, expenses and damages associated with any such
corrections or revisions.
D. All CADD drawings, figures, and other work shall be produced by CONSULTANT
and Subconsultants using the SANITATION DISTRICT standard software.
Conversion of CADD work from any other non-standard CADD format to the
SANITATION DISTRICT format shall not be acceptable in lieu of this
requirement.
Electronic files shall be subject to an acceptance period of sixty (60)calendar
days during which the SANITATION DISTRICT shall perform appropriate
acceptance tests. CONSULTANT shall correct any discrepancies or errors
detected and reported within the acceptance period at no additional cost to the
SANITATION DISTRICT.
E. All professional services performed by the CONSULTANT, including but not
limited to all drafts, data, correspondence, proposals, reports, and estimates
compiled or composed by the CONSULTANT, pursuant to this Agreement, are
for the sole use of the SANITATION DISTRICT, its agents and employees.
Neither the documents nor their contents shall be released to any third parry
without the prior written consent of the SANITATION DISTRICT. This provision
does not apply to information that (a)was publicly known, or otherwise known to
the CONSULTANT, at the time that it was disclosed to the CONSULTANT by the
SANITATION DISTRICT, (b)subsequently becomes publicly known to the
CONSULTANT other than through disclosure by the SANITATION DISTRICT.
2. COMPENSATION
Total compensation shall be paid to CONSULTANT for services in accordance with the
following provisions:
A. Total Compensation
Total compensation shall be in an amount not to exceed two hundred twenty-two
thousand five hundred three dollars ($222,503.00). Total compensation to
CONSULTANT including burdened labor (salaries plus benefits), overhead,
profit, direct costs, and Subconsultant(s)fees and costs shall not exceed the sum
set forth in Attachment"E"— Fee Proposal.
B. Labor
As a portion of the total compensation to be paid to CONSULTANT, the
SANITATION DISTRICT shall pay to CONSULTANT a sum equal to the
burdened salaries (salaries plus benefits)actually paid by CONSULTANT
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 2 of 17
Return to Mende Report
charged on an hourly-rate basis to this project and paid to the personnel of
CONSULTANT. Upon request of the SANITATION DISTRICT, CONSULTANT
shall provide the SANITATION DISTRICT with certified payroll records of all
employees' work that is charged to this project.
C. Overhead
As a portion of the total compensation to be paid to CONSULTANT, the
SANITATION DISTRICT shall compensate CONSULTANT and Subconsultants
for overhead at the rate equal to the percentage of burdened labor as specified in
Attachment"E"—Fee Proposal.
D. Profit
Profit for CONSULTANT and Subconsultants shall be a percentage of consulting
services fees (Burdened Labor and Overhead). When the consulting or
subconsulting services amount is $250,000 or less, the maximum Profit shall be
10%. Between $250,000 and $2,500,000, the maximum Profit shall be limited by
a straight declining percentage between 10% and 5%. For consulting or
subconsulting services fees with a value greater than $2,500,000, the maximum
Profit shall be 5%. Addenda shall be governed by the same maximum Profit
percentage after adding consulting services fees.
As a portion of the total compensation to be paid to CONSULTANT and
Subconsultants, the SANITATION DISTRICT shall pay profit for all services
rendered by CONSULTANT and Subconsultants for this project according to
Attachment"E"—Fee Proposal.
E. Subconsultants
For any Subconsultant whose fees for services are greater than or equal to
$100,000 (excluding out-of-pocket costs), CONSULTANT shall pay to
Subconsultant total compensation in accordance with the Subconsultant amount
specified in Attachment"E"—Fee Proposal.
For any Subconsultant whose fees for services are less than $100,000,
CONSULTANT may pay to Subconsultant total compensation on an hourly-rate
basis per the attached hourly rate Schedule and as specified in the Scope of
Work. The SANITATION DISTRICT shall pay to CONSULTANT the actual costs
of Subconsultant fees and charges in an amount not to exceed the sum set forth
in Attachment"E"— Fee Proposal.
F. Direct Costs
The SANITATION DISTRICT shall pay to CONSULTANT and Subconsultants
the actual costs of permits and associated fees, travel and licenses for an
amount not to exceed the sum set forth in Attachment"E"—Fee Proposal. The
SANITATION DISTRICT shall also pay to CONSULTANT actual costs for
equipment rentals, leases or purchases with prior approval of the SANITATION
DISTRICT. Upon request, CONSULTANT shall provide to the SANITATION
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 3 of 17
DISTRICT receipts and other documentary records to support CONSULTANT's
request for reimbursement of these amounts, see Attachment"D"—Allowable
Direct Costs. All incidental expenses shall be included in overhead pursuant to
Section 2 -COMPENSATION above.
3. REALLOCATION OF TOTAL COMPENSATION
The SANITATION DISTRICT, by its Director of Engineering, shall have the right to
approve a reallocation of the incremental amounts constituting the total compensation,
provided that the total compensation is not increased.
4. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed
breakdown of costs associated with the performance of any corrections or
revisions of the work for that invoicing period. CONSULTANT shall allocate costs
in the same manner as it would for payment requests as described in this Section
of the Agreement. CONSULTANT shall warrant and certify the accuracy of these
costs and understand that submitted costs are subject to Section 11 -AUDIT
PROVISIONS.
B. CONSULTANT may submit monthly or periodic statements requesting payment
for those items included in Section 2- COMPENSATION hereof in the format as
required by the SANITATION DISTRICT. Such requests shall be based upon the
amount and value of the work and services performed by CONSULTANT under
this Agreement and shall be prepared by CONSULTANT and accompanied by
such supporting data, including a detailed breakdown of all costs incurred and
project element work performed during the period covered by the statement, as
may be required by the SANITATION DISTRICT.
Upon approval of such payment request by the SANITATION DISTRICT,
payment shall be made to CONSULTANT as soon as practicable of one hundred
percent (100%)of the invoiced amount on a per-project-element basis.
If the SANITATION DISTRICT determines that the work under this Agreement or
any specified project element hereunder, is incomplete and that the amount of
payment is in excess of:
i. The amount considered by the SANITATION DISTRICT's Director of
Engineering to be adequate for the protection of the SANITATION DISTRICT;
or
ii. The percentage of the work accomplished for each project element.
He or she may, at his or her discretion, retain an amount equal to that which
insures that the total amount paid to that date does not exceed the percentage of
the completed work for each project element or the project in its entirety.
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 4 of 17
Return to Aaenda Report
C. CONSULTANT may submit periodic payment requests for each 30-day period of
this Agreement for the profit as set forth in Section 2 -COMPENSATION above.
Said profit payment request shall be proportionate to the work actually
accomplished to date on a per-project-element basis. In the event the
SANITATION DISTRICT's Director of Engineering determines that no satisfactory
progress has been made since the prior payment, or in the event of a delay in the
work progress for any reason, the SANITATION DISTRICT shall have the right to
withhold any scheduled proportionate profit payment.
D. Upon satisfactory completion by CONSULTANT of the work called for under the
terms of this Agreement, and upon acceptance of such work by the SANITATION
DISTRICT, CONSULTANT will be paid the unpaid balance of any money due for
such work, including any retained percentages relating to this portion of the work.
E. Upon satisfactory completion of the work performed hereunder and prior to final
payment under this Agreement for such work, or prior settlement upon
termination of this Agreement, and as a condition precedent thereto,
CONSULTANT shall execute and deliver to the SANITATION DISTRICT a
release of all claims against the SANITATION DISTRICT arising under or by
virtue of this Agreement other than such claims, if any, as may be specifically
exempted by CONSULTANT from the operation of the release in stated amounts
to be set forth therein.
F. Pursuant to the California False Claims Act(Government Code Sections 12650-
12655), any CONSULTANT that knowingly submits a false claim to the
SANITATION DISTRICT for compensation under the terms of this Agreement
may be held liable for treble damages and up to a ten thousand dollar ($10,000)
civil penalty for each false claim submitted. This Section shall also be binding on
all Subconsultants.
A CONSULTANT or Subconsultant shall be deemed to have submitted a false
claim when the CONSULTANT or Subconsultant: a) knowingly presents or
causes to be presented to an officer or employee of the SANITATION DISTRICT
a false claim or request for payment or approval; b) knowingly makes, uses, or
causes to be made or used a false record or statement to get a false claim paid
or approved by the SANITATION DISTRICT; c)conspires to defraud the
SANITATION DISTRICT by getting a false claim allowed or paid by the
SANITATION DISTRICT; d) knowingly makes, uses, or causes to be made or
used a false record or statement to conceal, avoid, or decrease an obligation to
the SANITATION DISTRICT; or e) is a beneficiary of an inadvertent submission
of a false claim to the SANITATION DISTRICT, and fails to disclose the false
claim to the SANITATION DISTRICT within a reasonable time after discovery of
the false claim.
5. PREVAILING WAGES
To the extent CONSULTANT intends to employ employees who will perform work during
the design and preconstruction phases of a construction contract, as more specifically
defined under Labor Code Section 1720, CONSULTANT shall be subject to prevailing
wage requirements with respect to such employees.
PCSA PROJECT NO. P2-106
Revised 07/29/13
Page 5 of 17
6. DOCUMENT OWNERSHIP—SUBSEQUENT CHANGES TO PLANS AND
SPECIFICATIONS
A. Ownership of Documents for the Professional Services performed.
All documents, including but not limited to, original plans, studies, sketches,
drawings, computer printouts and disk files, and specifications prepared in
connection with or related to the Scope of Work or Professional Services, shall
be the property of the SANITATION DISTRICT. The SANITATION DISTRICT's
ownership of these documents includes use of, reproduction or reuse of and all
incidental rights, whether or not the work for which they were prepared has been
performed. The SANITATION DISTRICT ownership entitlement arises upon
payment or any partial payment for work performed and includes ownership of
any and all work product completed prior to that payment. This Section shall
apply whether the CONSULTANT's Professional Services are terminated: a) by
the completion of the Agreement, or b) in accordance with other provisions of this
Agreement. Notwithstanding any other provision of this paragraph or Agreement,
the CONSULTANT shall have the right to make copies of all such plans, studies,
sketches, drawings, computer printouts and disk files, and specifications.
B. CONSULTANT shall not be responsible for damage caused by subsequent
changes to or uses of the plans or specifications, where the subsequent changes
or uses are not authorized or approved by CONSULTANT, provided that the
service rendered by CONSULTANT was not a proximate cause of the damage.
7. INSURANCE
A. General
i. Insurance shall be issued and underwritten by insurance companies
acceptable to the SANITATION DISTRICT.
ii. Insurers must have an "A-" Policyholder's Rating, or better, and Financial
Rating of at least Class Vill, or better, in accordance with the most current
A.M. Best's Guide Rating. However, the SANITATION DISTRICT will accept
State Compensation Insurance Fund, for the required policy of Workers
Compensation Insurance subject to the SANITATION DISTRICT's option to
require a change in insurer in the event the State Fund financial rating is
decreased below"B". Further, the SANITATION DISTRICT will require
CONSULTANT to substitute any insurer whose rating drops below the levels
herein specified. Said substitution shall occur within twenty(20) days of
written notice to CONSULTANT, by the SANITATION DISTRICT or its agent.
III. Coverage shall be in effect prior to the commencement of any work under
this Agreement.
PCSA PROJECT NO. P2-106
Revised 07/29/13
Page 6 of 17
Return to Mende Report
B. General Liability
The CONSULTANT shall maintain during the life of this Agreement, including the
period of warranty, Commercial General Liability Insurance written on an
occurrence basis providing the following minimum limits of liability coverage: one
million dollars ($1,000,000.00) per occurrence with one million dollars
($1,000,000.00)aggregate. Said insurance shall include coverage for the
following hazards: Premises-Operations, blanket contractual liability(for this
Agreement), products liability/completed operations (including any product
manufactured or assembled), broad form property damage, blanket contractual
liability, independent contractors liability, personal and advertising injury, mobile
equipment, owners and contractors protective liability, and cross liability and
severability of interest clauses. A statement on an insurance certificate will not be
accepted in lieu of the actual additional insured endorsement(s). If requested by
SANITATION DISTRICT and applicable, XCU coverage (Explosion, Collapse
and Underground) must be included in the General Liability policy and coverage
must be reflected on the submitted Certificate of Insurance.
C. Umbrella Excess Liability
The minimum limits of general liability and automotive liability insurance required,
as set forth herein, shall be provided for through either a single policy of primary
insurance or a combination of policies of primary and umbrella excess coverage.
Umbrella excess liability coverage shall be issued with limits of liability which,
when combined with the primary insurance, will equal the minimum limits for
general liability and automotive liability.
D. AutomotiveNehicle liability Insurance
The CONSULTANT shall maintain a policy of Automotive Liability Insurance on a
comprehensive form covering all owned, non-owned, and hired automobiles,
trucks, and other vehicles providing the following minimum limits of liability
coverage: Combined single limit of one million dollars ($1,000,000.00) or
alternatively, one million dollars ($1,000,000.00) per person for bodily injury and
one million dollars ($1,000,000.00) per accident for property damage. A
statement on an insurance certificate will not be accepted in lieu of the actual
additional insured endorsement.
E. Worker's Compensation Insurance
The CONSULTANT shall provide such Workers' Compensation Insurance as
required by the Labor Code of the State of California in the amount of the
statutory limit, including Employer's Liability Insurance with a minimum limit of
one million dollars ($1,000,000.00) per occurrence. Such Worker's
Compensation Insurance shall be endorsed to provide for a waiver of
subrogation in favor of the SANITATION DISTRICT. A statement on an
insurance certificate will not be accepted in lieu of the actual endorsements
unless the insurance carrier is State of California Insurance Fund and the
identifier"SCIF" and endorsement numbers 2570 and 2065 are referenced on
the certificate of insurance.
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 7 of 17
F. Errors and Omissions/Professional Liability
CONSULTANT shall maintain in full force and effect, throughout the term of this
Agreement, standard industry form professional negligence errors and omissions
insurance coverage in an amount of not less than two million dollars
($2,000,000.00)with limits in accordance with the provisions of this Paragraph. If
the policy of insurance is written on a "claims made" basis, said policy shall be
continued in full force and effect at all times during the term of this Agreement,
and for a period of five (5) years from the date of the completion of the services
hereunder.
In the event of termination of said policy during this period, CONSULTANT shall
obtain continuing insurance coverage for the prior acts or omissions of
CONSULTANT during the course of performing services under the term of this
Agreement. Said coverage shall be evidenced by either a new policy evidencing
no gap in coverage or by separate extended "tail" coverage with the present or
new carrier.
In the event the present policy of insurance is written on an "occurrence" basis,
said policy shall be continued in full force and effect during the term of this
Agreement or until completion of the services provided for in this Agreement,
whichever is later. In the event of termination of said policy during this period,
new coverage shall be obtained for the required period to insure for the prior acts
of CONSULTANT during the course of performing services under the term of this
Agreement.
CONSULTANT shall provide to the SANITATION DISTRICT a certificate of
insurance in a form acceptable to the SANITATION DISTRICT indicating the
deductible or self-retention amounts and the expiration date of said policy, and
shall provide renewal certificates not less than ten (10)days prior to the
expiration of each policy term.
G. Proof of Coverage
The CONSULTANT shall furnish the SANITATION DISTRICT with original
certificates and amendatory endorsements effecting coverage. Said policies and
endorsements shall conform to the requirements herein stated. All certificates
and endorsements are to be received and approved by the SANITATION
DISTRICT before work commences. The SANITATION DISTRICT reserves the
right to require complete, certified copies of all required insurance policies,
including endorsements, effecting the coverage required, at any time. The
following are approved forms that must be submitted as proof of coverage:
• Certificate of Insurance ACORD Form 25-S(7/97)or equivalent.
• Additional Insurance (ISO Form) CG2010 11 85 or
(General Liability)
The combination of(ISO Forms)
CG 2010 10 01 and CG 2037 10 01
All other Additional Insured endorsements must
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 8 of 17
Return to Mende Report
be submitted for approval by the SANITATION
DISTRICT, and the SANITATION DISTRICT
may reject alternatives that provide different or
less coverage to the SANITATION DISTRICT.
• Additional Insured Submit endorsement provided by carrier for the
(Auto Liability) SANITATION DISTRICT approval.
• Waiver of Subrogation State Compensation Insurance Fund
Endorsement No. 2570 or equivalent.
• Cancellation Notice State Compensation Insurance Fund
Endorsement No. 2065 or equivalent.
H. Cancellation Notice
Each insurance policy required herein shall be endorsed to state that coverage
shall not be cancelled by either party, except after thirty (30)days' prior written
notice. The Cancellation Section of ACORD Form 25-5 (7/97)shall state the
required thirty (30) days' written notification. The policy shall not terminate, nor
shall it be cancelled, nor the coverage reduced until thirty(30) days after written
notice is given to the SANITATION DISTRICT except for nonpayment of
premium, which shall require not less than ten (10) days written notice to the
SANITATION DISTRICT. Should there be changes in coverage or an increase in
deductible or SIR amounts, the CONSULTANT and its insurance broker/agent
shall send to the SANITATION DISTRICT a certified letter which includes a
description of the changes in coverage and/or any increase in deductible or SIR
amounts. The certified letter must be sent to the attention of Contracts
Administration, Division 230, and shall be received by the SANITATION
DISTRICT not less than thirty(30) days prior to the effective date of the
changes) if the change would reduce coverage or increase deductibles or SIR
amounts or otherwise reduce or limit the scope of insurance coverage provided
to the SANITATION DISTRICT.
I. Primary Insurance
All liability policies shall contain a Primary and Non Contributory Clause. Any
other insurance maintained by the SANITATION DISTRICT shall be excess and
not contributing with the insurance provided by CONSULTANT.
J. Separation of Insured
All liability policies shall contain a "Separation of Insureds" clause.
K. Non-Limiting (if applicable)
Nothing in this document shall be construed as limiting in any way, nor shall it
limit the indemnification provision contained in this Agreement, or the extent to
which CONSULTANT may be held responsible for payment of damages to
persons or property.
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 9 of 17
L. Deductibles and Self-Insured Retentions
Any deductible and/or self-insured retention must be declared to the
SANITATION DISTRICT on the Certificate of Insurance. All deductibles and/or
self-insured retentions require approval by the SANITATION DISTRICT. At the
option of the SANITATION DISTRICT, either: the insurer shall reduce or
eliminate such deductible or self-insured retention as respects the SANITATION
DISTRICT; or the CONSULTANT shall provide a financial guarantee satisfactory
to the SANITATION DISTRICT guaranteeing payment of losses and related
investigations, claim administration and defense expenses.
M. Defense Costs
Liability policies shall have a provision that defense costs for all insureds and
additional insureds are paid in addition to and do not deplete any policy limits.
N. Suboonsultants
The CONSULTANT shall be responsible to establish insurance requirements for
any Subconsultant hired by the CONSULTANT. The insurance shall be in
amounts and types reasonably sufficient to deal with the risk of loss involving the
Subconsultant's operations and work.
8. SCOPE CHANGES
In the event of a change in the Scope of Work, requested by SANITATION DISTRICT,
the parties hereto shall execute an amendment to this Agreement setting forth with
particularity all terms of the new Agreement, including but not limited to any additional
CONSULTANT's fees.
9. PROJECT TEAM AND SUBCONSULTANTS
CONSULTANT shall provide to SANITATION DISTRICT, prior to execution of this
Agreement, the names and full description of all Subconsultants and CONSULTANT's
project team members anticipated to be used on this project by CONSULTANT.
CONSULTANT shall include a description of the scope of work to be done by each
Subconsultant and each CONSULTANT's project team member. CONSULTANT shall
include the respective compensation amounts for CONSULTANT and each
Subconsultant on a per-project-element basis, broken down as indicated in Section 2-
COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT's project
team members without prior written approval by the SANITATION DISTRICT.
PCSA PROJECT NO. P2-106
Revised 07/29/13
Page 10 of 17
Return to Mende Report
10. ENGINEERING REGISTRATION
The CONSULTANT's personnel are comprised of registered engineers and a staff of
specialists and draftsmen in each department. The firm itself is not a registered
engineer but represents and agrees that wherever in the performance of this Agreement
requires the services of a registered engineer. Such services hereunder will be
performed under the direct supervision of registered engineers.
11. AUDIT PROVISIONS
A. SANITATION DISTRICT retains the reasonable right to access, review, examine,
and audit, any and all books, records, documents and any other evidence of
procedures and practices that the SANITATION DISTRICT determines are
necessary to discover and verify that the CONSULTANT is in compliance with all
requirements under this Agreement. The CONSULTANT shall include the
SANITATION DISTRICT's right as described above, in any and all of their
subcontracts, and shall ensure that these rights are binding upon all
Subconsultants.
B. SANITATION DISTRICT retains the right to examine CONSULTANT's books,
records, documents and any other evidence of procedures and practices that the
SANITATION DISTRICT determines are necessary to discover and verify all
direct and indirect costs, of whatever nature, which are claimed to have been
incurred, or anticipated to be incurred or to ensure CONSULTANT's compliance
with all requirements under this Agreement during the term of this Agreement
and for a period of three (3)years after its termination.
C. CONSULTANT shall maintain complete and accurate records in accordance with
generally accepted industry standard practices and the SANITATION
DISTRICT's policy. The CONSULTANT shall make available to the
SANITATION DISTRICT for review and audit, all project related accounting
records and documents, and any other financial data within fifteen (15)days after
receipt of notice from the SANITATION DISTRICT. Upon SANITATION
DISTRICT's request, the CONSULTANT shall submit exact duplicates of
originals of all requested records to the SANITATION DISTRICT. If an audit is
performed, CONSULTANT shall ensure that a qualified employee of the
CONSULTANT will be available to assist SANITATION DISTRICT's auditor in
obtaining all project related accounting records and documents, and any other
financial data.
12. LEGAL RELATIONSHIP BETWEEN PARTIES
The legal relationship between the parties hereto is that of an independent contractor
and nothing herein shall be deemed to make CONSULTANT an employee of the
SANITATION DISTRICT.
PCSA PROJECT NO. P2-106
Revised 07/29/13
Page 11 of 17
13. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of
this Agreement, or changes thereto, shall be effected by delivery of said notices in
person or by depositing said notices in the U.S. mail, registered or certified mail, return
receipt requested, postage prepaid.
Notices shall be mailed to the SANITATION DISTRICT at:
ORANGE COUNTY SANITATION DISTRICT
10844 Ellis Avenue
Fountain Valley, CA 92708-7018
Attention: Larry Roberson, Senior Contracts Administrator
Copy: Wendy Sevenandt, Project Manager
Notices shall be mailed to CONSULTANT at:
DUDEK
605 Third Street
Encinitas, CA 92024
Attention: Tom Falk, Project Manager
All communication regarding the Scope of Work, will be addressed to the SANITATION
DISTRICT's Project Manager. Direction from other SANITATION DISTRICT staff must
be approved in writing by the SANITATION DISTRICT's Project Manager prior to action
from the CONSULTANT.
14. TERMINATION
The SANITATION DISTRICT may terminate this Agreement at any time, without cause,
upon giving thirty(30) days written notice to CONSULTANT. In the event of such
termination, CONSULTANT shall be entitled to compensation for work performed on a
prorated basis through and including the effective date of termination.
CONSULTANT shall be permitted to terminate this Agreement upon thirty (30)days
written notice only if CONSULTANT is not compensated for billed amounts in
accordance with the provisions of this Agreement, when the same are due.
Notice of termination shall be mailed to the SANITATION DISTRICT and/or
CONSULTANT in accordance with Section 13- NOTICES.
15. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this project shall become the property of the
SANITATION DISTRICT upon the termination or completion of the work.
CONSULTANT agrees to furnish to the SANITATION DISTRICT copies of all
memoranda, correspondence, computation and study materials in its files pertaining to
the work described in this Agreement, which is requested in writing by the SANITATION
DISTRICT.
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 12 of 17
Return to Aaenda Report
16. COMPLIANCE
CONSULTANT certifies by the execution of this Agreement that it pays employees not
less than the minimum wage as defined by law, and that it does not discriminate in its
employment with regard to race, color, religion, sex or national origin; that it is in
compliance with all federal, state and local directives and executive orders regarding
non-discrimination in employment; and that it agrees to demonstrate positively and
aggressively the principle of equal opportunity in employment.
17. AGREEMENT EXECUTION AUTHORIZATION
Both the SANITATION DISTRICT and CONSULTANT do covenant that each individual
executing this document by and on behalf of each party is a person duly authorized to
execute agreements for that party.
18. DISPUTE RESOLUTION
In the event of a dispute arising between the parties regarding performance or
interpretation of this Agreement, the dispute shall be resolved by binding arbitration
under the auspices of the Judicial Arbitration and Mediation Service ("JAMS"), or similar
organization or entity conducting alternate dispute resolution services.
19. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS
If any action at law or in equity or if any proceeding in the form of an Alternative Dispute
Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the
prevailing party shall be entitled to reasonable attorney's fees, costs and necessary
disbursements in addition to any other relief to which it may be entitled.
20. PROGRESS REPORTS
Monthly progress reports shall be submitted for review by the tenth day of the following
month and must include as a minimum: 1) current activities, 2)future activities, 3)
potential items that are not included in the Scope of Work, 4) concerns and possible
delays, 5) percentage of completion, and 6) budget status.
21. WARRANTY
CONSULTANT shall perform its services in accordance with generally accepted industry
and professional standards. If, within the 12-month period following completion of its
services, the SANITATION DISTRICT informs CONSULTANT that any part of the
services fails to meet those standards, CONSULTANT shall, within the time prescribed
by the SANITATION DISTRICT, take all such actions as are necessary to correct or
complete the noted deficiency(ies).
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 13 of 17
22. INDEMNIFICATION
To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at
CONSULTANT's sole cost and expense and with legal counsel approved by the
SANITATION DISTRICT, which approval shall not be unreasonably withheld), protect
and hold harmless the SANITATION DISTRICT and all of SANITATION DISTRICT's
officers, directors, employees, CONSULTANT's, and agents (collectively the
"Indemnified Parties"), from and against any and all claims, damages, liabilities, causes
of action, suits, arbitration awards, losses,judgments, fines, penalties, costs and
expenses (including, without limitation, attorneys' fees, disbursements and court costs,
and all other professional, expert or CONSULTANT's fees and costs and the
SANITATION DISTRICT's general and administrative expenses; individually, a "Claim";
collectively, "Claims")which may arise from or are in any manner related, directly or
indirectly, to any work performed, or any operations, activities, or services provided by
CONSULTANT in carrying out its obligations under this Agreement to the extent of the
negligent, recklessness and/or willful misconduct of CONSULTANT, its principals,
officers, agents, employees, CONSULTANT's suppliers, CONSULTANT,
Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of
them, regardless of any contributing negligence or strict liability of an Indemnified Party.
Notwithstanding the foregoing, nothing herein shall be construed to require
CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from:
(A)the active negligence or willful misconduct of the Indemnified Parties; or
(B)a natural disaster or other act of God, such as an earthquake; or
(C)the independent action of a third party who is neither one of the Indemnified Parties
nor the CONSULTANT, nor its principal, officer, agent, employee, nor
CONSULTANT's supplier, CONSULTANT, Subconsultant, subcontractor, nor
anyone employed directly or indirectly by any of them.
Exceptions (A)through (B) above shall not apply, and CONSULTANT shall, to the fullest
extent permitted by law, indemnify the Indemnified Parties, from Claims arising from
more than one cause if any such cause taken alone would otherwise result in the
obligation to indemnify hereunder.
CONSULTANT's liability for indemnification hereunder is in addition to any liability
CONSULTANT may have to the SANITATION DISTRICT for a breach by
CONSULTANT of any of the provisions of this Agreement. Under no circumstances
shall the insurance requirements and limits set forth in this Agreement be construed to
limit CONSULTANT's indemnification obligation or other liability hereunder. The terms
of this Agreement are contractual and the result of negotiation between the parties
hereto. Accordingly, any rule of construction of contracts (including, without limitation,
California Civil Code Section 1654)that ambiguities are to be construed against the
drafting party, shall not be employed in the interpretation of this Agreement.
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 14 of 17
Return to Mende Report
23. DUTY TO DEFEND
The duty to defend hereunder is wholly independent of and separate from the duty to
indemnify and such duty to defend shall exist regardless of any ultimate liability of
CONSULTANT and shall be consistent with Civil Code Section 2782.8. Such defense
obligation shall arise immediately upon presentation of a Claim by any person if, without
regard to the merit of the Claim, such Claim could potentially result in an obligation to
indemnify one or more Indemnified Parties, and upon written notice of such Claim being
provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the
payment or advance of defense costs by any Indemnified Party shall not be a condition
precedent to enforcing such Indemnified Party's rights to indemnification hereunder. In
the event a final judgment, arbitration, award, order, settlement, or other final resolution
expressly determines that the claim did not arise out of, pertain to, or relate to the
negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent,
then the DISTRICT will reimburse CONSULTANT for the reasonable costs of defending
the Indemnified Parties against such claims.
CONSULTANT's indemnification obligation hereunder shall survive the expiration or
earlier termination of this Agreement until such time as action against the Indemnified
Parties for such matter indemnified hereunder is fully and finally barred by the applicable
statute of limitations.
24. CONSULTANT PERFORMANCE
The CONSULTANT's performance shall be evaluated by the SANITATION DISTRICT.
A copy of the evaluation shall be sent to the CONSULTANT for comment. The
evaluation, together with the comments, shall be retained by the SANITATION
DISTRICT and may be considered in future CONSULTANT selection processes.
25. CLOSEOUT
When the SANITATION DISTRICT determines that all Work authorized under the
Agreement is fully complete and that the SANITATION DISTRICT requires no further
work from CONSULTANT, or the Agreement is otherwise terminated or expires in
accordance with the terms of the Agreement, the SANITATION DISTRICT shall give the
Consultant written notice that the Agreement will be closed-out. CONSULTANT shall
submit all outstanding billings, work submittals, deliverables, reports or similarly related
documents as required under the Agreement within thirty (30)days of receipt of notice of
Agreement closeout.
Upon receipt of CONSULTANT's submittals, the SANITATION DISTRICT shall
commence a closeout audit of the Agreement and will either:
i. Give the CONSULTANT a final Agreement Acceptance: or
ii. Advise the CONSULTANT in writing of any outstanding item or items which must be
furnished, completed, or corrected at the CONSULTANT's cost.
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 15 of 17
CONSULTANT shall be required to provide adequate resources to fully support any
administrative closeout efforts identified in this Agreement. Such support must be
provided within the timeframe requested by the SANITATION DISTRICT.
Notwithstanding the final Agreement Acceptance the CONSULTANT will not be relieved
of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to
complete any portions of the work, the non-completion of which were not disclosed to
the SANITATION DISTRICT (regardless of whether such nondisclosures were
fraudulent, negligent, or otherwise); and the CONSULTANT shall remain obligated under
all those provisions of the Agreement which expressly or by their nature extend beyond
and survive final Agreement Acceptance.
Any failure by the SANITATION DISTRICT to reject the work or to reject the
CONSULTANT's request for final Agreement Acceptance as set forth above shall not be
deemed to be acceptance of the work by the SANITATION DISTRICT for any purpose
nor imply acceptance of, or agreement with, the CONSULTANT's request for final
Agreement Acceptance.
26. ENTIRE AGREEMENT
This Agreement constitutes the entire understanding and agreement between the
Parties and supersedes all previous negotiations between them pertaining to the subject
matter thereof.
PCSA PROJECT NO. P2-106
Revised 07/29/13
Page 16 of 17
Return to Mende Report
IN WITNESS WHEREOF, this Agreement has been executed in the name of the SANITATION
DISTRICT, by its officers thereunto duly authorized, and CONSULTANT as of the day and year
first above written.
CONSULTANT: DUDEK
By
Date
Printed Name &Title
ORANGE COUNTY SANITATION DISTRICT
By
Chair, Board of Directors Date
By
Clerk of the Board Date
By
Contracts, Purchasing and Materials Date
Management Manager
Attachments: Attachment"A" Scope of Work for Construction Support Services
Attachment"B" Not Used
Attachment"C" Not Used
Attachment"D" Allowable Direct Costs
Attachment"E" Fee Proposal
Attachment"F" Not Used
Attachment"G" Not Used
Attachment"H" Not Used
Attachment"I" Not Used
Attachment"J" Not Used
Attachment X' Hourly Rate Schedule for Minor Subconsultants
LDR
EDMS:003977210
PCSA PROJECT NO. P2-106
Remed 07/29/13
Page 17 of 17
P2-106 PCSA
ATTACHMENT "A"
SCOPE OF WORK FOR CONSTRUCTION
SUPPORT SERVICES
Return to Mende Report
ATTACHMENT "A"
SCOPE OF WORK FOR
CONSTRUCTION SUPPORT SERVICES
Boiler System Rehabilitation and Scrubbers H & I Demolition
Project No. P2-106
TABLE OF CONTENTS
I. SUMMARY..........................................................................................................................................2
II. PROJECT ELEMENTS.....................................................................................................................2
IILPROJECT SCHEDULE......................................................................................................................2
IV.PROJECT IMPLEMENTATION.....................................................................................................2
PHASE 4-CONSTRUCTION AND INSTALLATION SERVICES...................................................2
PHASE 5-COMMISSIONING SERVICES..........................................................................................7
PHASE 6-CLOSE-OUT..........................................................................................................................8
V. STAFF ASSISTANCE......................................................................................................................10
EXHIBITS:..............................................................................................................................................10
June 7, 2013 Project No. P2-106
Page 1 of 10
I. SUMMARY
Provide construction support services for the construction and installation, commissioning, and
close out of the project described herein.
It. PROJECT ELEMENTS
Dudek prepared the final design for a Boiler System Rehabilitation and Scrubbers H & I
Demolition to include replacement of the feedwater system, replacement of the boiler burners
and control system, and demolition of the abandoned trunk line scrubbers H & I and associated
ductwork and appurtenances.
III. PROJECT SCHEDULE
Major Milestones Estimated
Schedule
Provide Construction Support and Commissioning Services January 2014 to
January 2015
Project Closeout January 2015 to
April 2015
TOTAL SCHEDULE TIME 16 Months
IV. PROJECT IMPLEMENTATION
All Sanitation District Projects are divided into six (6) phases. Under this Agreement, Dudek
shall provide engineering support services for Phase 4—Construction, Phase 5—
Commissioning, and Phase 6—Closeout.
Phase 4—Construction and Installation Services
Phase 5— Commissioning Services
Phase 6— Closeout
PHASE 4—CONSTRUCTION AND INSTALLATION SERVICES
The Sanitation District shall administer and provide field inspection for construction contracts.
Construction and installation support services shall be provided by Dudek as requested by the
Sanitation District. Dudek shall refer to the Engineering Design Guidelines, Chapter 01 for
detailed requirements.
Dudek shall provide the key management personnel as described in their proposal on this
project. Dudek shall not reassign the key project personnel without prior approval of OCSD.
June 7, 2013 Project No. P2-106
Page 2 of 10
Return to Mende Report
OCSD may request reassignment of any of Dudek's or their subconsultant's personnel, based
on that individual's performance
For purposes of the proposal, Dudek shall include hours and fees in their Proposal for
appropriate personnel classifications to perform the tasks described below.
Task 4.1 — Preconstruction Conference
Attendance at the Preconstruction Conference is not required.
Task 4.2—Submittals
The Sanitation District will receive and log-in all submittals from the Contractor. The Sanitation
District will forward two copies of all shop drawing, data, and submittals requiring Design
Consultant review. Dudek will review and provide comments to (or take other appropriate
action in respect of)the shop drawings and other data which the contractor is required to
submit for conformance with the information given in the Contract Documents and compatibility
with the design concept of the completed project as a functioning whole as indicated in the
Contract Documents. Such reviews and approvals or other action will not extend to means,
methods, techniques, sequences or procedures of construction or to safety precautions and
programs.
Dudek shall return the submittal review comments to the Sanitation District within the time
frame that allows the Sanitation District to meet the specification requirements for review.
Dudek shall return comments to the Sanitation District allowing sufficient time for the Sanitation
District to incorporate all comments into a combined review comment set that the Sanitation
District will return to the Contractor. Dudek's estimate for this task shall be based on the
Contractor providing an acceptable submittal as either the original submittal or the first
resubmittal. Dudek shall accommodate occasional expedited reviews for time sensitive
submittals. Submittals shall include but not be limited to shop drawings, commissioning plan,
vendor tests, certifications, and test reports.
Pre-Submittal Meeting: CONSULTANT shall attend a two-hour pre-submittal meeting with
OCSD and Contractor staff to coordinate the submittal effort.
For the purpose of this proposal, the CONSTULANT shall assume 25 Contractor
submittals/shop drawings and 20 resubmittals shall be reviewed by the CONSULTANT
Task 4.3— Request for Information (RFIs)
The Sanitation District will log in and forward to Dudek RFIs generated by the Contractor or the
Sanitation District. Dudek shall return written responses to the Sanitation District clarifying the
requirements of the Contract Documents. Dudek shall generate necessary sketches for the
clarification which can be created as CAD or hand sketches. Dudek shall occasionally
expedite the review of time sensitive RFIs.
Dudek will issue necessary clarifications, interpretations, and redesign of the Contract
Documents requested by the Contractor through the District, as appropriate for the orderly
completion of the work. Such clarifications and interpretations will be consistent with the intent
of and reasonably inferable from the Contract Documents.
June 7, 2013 Project No. P2-106
Page 3 of 10
For the purpose of estimating the effort for this task, assume that 30 RFIs shall be reviewed
and responded to by the CONSULTANT.
Task 4.4—Contract Modifications, Design Changes, and Change Orders
If the Contract Documents require modifications, due to changed conditions, OCSD requested
changes, omissions or design errors; CONSULTANT shall prepare preliminary change order
documents and forward them to OCSD. OCSD shall review the proposed change and request
CONSULTANT to incorporate any changes. OCSD will issue the change order documents in a
formal Request for Proposal (RFP)or Field Change Order(FCO)to the Contractor.
CONSULTANT shall forward design calculations and other design backup documents as
necessary to OCSD. CONSULTANT shall prepare cost estimates for the changes when
requested by OCSD.
For the purpose of this proposal, the CONSTULANT shall assume appropriate documentation
for 10 change orders shall be prepared by the CONSULTANT.
Any Contract Document that requires changes shall be identified with date of change and
reference (RFI number, RFP number, FCO number, etc.)shown on the document. Changes
shown on drawings shall be clearly marked and "clouded"for accurate identification of the
scope of change by the Contractor and inspection staff. CONSULTANT shall maintain up-to-
date Contract Documents. When a change is required on a contract drawing that has
previously undergone a change, the updated drawing showing the previous change shall be
used as the base document to identify new changes.
CONSULTANT shall submit complete change documentation to OCSD for use in RFIs, RFPs,
and FCOs. This change documentation shall include plan drawings, schematics, details,
schedules, and specifications, as required.
Task 4.5—Site Visits, Weekly Progress Meetings and As-Built Review Meetings
Dudek shall have their Construction Project Manager or Project Engineer attend the weekly
progress meetings on an as needed basis. Dudek shall bring other design engineers or
suboonsultants to the weekly progress meetings as requested by the Sanitation District. The
Sanitation District will generate meeting minutes.
When requested by the Sanitation District, Dudek shall inspect the Contractor's as-built
drawings at the 50 and 100 percent of project completion to verify that the Contractor has
included all relevant information from approved change orders and RFIs. Dudek shall prepare
a summary of the findings for each of these inspections and forward it to the Sanitation District.
Dudek shall make field site visits or attend job site meetings to assist in field problem resolution
and design clarification/verification to help resolve construction issues as they arise and as
requested by the Sanitation District. Dudek shall report the nature of the field site visits, the
problem resolved, and identify staff conducting the site visit in Dudek's monthly project report.
The Sanitation District will provide project inspection.
Dudek shall attend the job walk for beneficial occupancy.
June 7, 2013 Project No. P2-106
Page 4 of 10
Return to Mende Report
Dudek shall assume 12 site visits for the Project Manager and 20 site visits for the Project
Engineer which includes attendance at progress meetings, as-built drawing checks, site visits
to resolve construction issues, and attendance at the job walk for beneficial occupancy.
Task 4.6—Claim Avoidance and Dispute Resolution Assistance
Assistance for claim avoidance and dispute resolution will be negotiated on an as-needed
basis.
Task 4.7— Pre-Commissioning
Pre-commissioning activities shall include work to ensure the commissioning team is functional,
the commissioning plan is in place, and test procedures are developed. Pre-commissioning
includes the ORTs, and FATS and RATS. Dudek will provide up to 2 reviews of the
Contractor's commissioning plan. OCSD staff will conduct a Gate meeting with management
to gain approval of the commissioning plan and acceptance to move from pre-commissioning
into commissioning.
Task 4.7.1 —Meetings, Workshops, and Submittal Review
Dudek shall attend the pre-submittal meeting for the Contractors Commissioning Plan and
subsequent meetings regarding the commissioning plan as requested. Dudek shall review the
Contractor's commissioning plan and assume up to two reviews for the commissioning plan.
Dudek shall participate in one two-hour workshop to provide input for the review and update
the communication plan and the risk plan. OCSD will update the plans.
Task 4.7.2— Factory Demonstration Tests
Dudek shall review the Contractors test plan (two review cycles)for the factory demonstration
tests including the boiler burner control system. Dudek shall be present at the boiler burner
control system factory demonstration test. Direct costs shall be included for travel expenses in
the proposal.
Task 4.7.3—ORT/FAT/RAT Test Procedures in Field
Dudek shall develop test procedures for field testing of the feedwater pumps, boiler burner
control system, and the 1/0 points transmitted to OCSD SCADA system.
Task 4.8—Operation Manual and Procedures (OMaP)
Dudek shall create Operation Manual and Procedures (OMaP)for the operators that shall
completely describe the functionality of the system based on the feedwater and boiler burner
control systems interactions and controls, monitoring points, system features accessible or
programmable by operators, and drawings. All features of the system shall be described for
normal equipment operation, fail-over equipment operation, and emergency equipment
operation. The OMaP shall follow the content requirements described in Exhibit A.
Dudek shall not start work on the OMaP until authorized by the Sanitation District. The basic
information requirement would not change, but the organization and file structure or other
standardization may change as the OMaP format is further developed by the Sanitation District.
June 7, 2013 Project No. P2-106
Page 5 of 10
The OMaP shall be complete prior to the Commissioning Phase of construction. The OMaP
shall be submitted, reviewed, all comments incorporated, additional review cycles completed,
and OMaP accepted by OCSD prior to any Operator Training prior to the Functional
Acceptance Test described in the construction documents. OCSD will comment on the OMaP
submittal within 30 days upon the submittal receipt. The Consultant shall address, resolve
and/or incorporate the comments and resubmit for review. Native and PDF electronic files
shall be submitted. One hard copy shall be submitted for each review cycle.
The OMaP shall be updated after the project startup.
Task 4.9 Equipment and Instrument Database
Dudek shall complete the consultant required entries in the EID as defined in the contract
specifications for this project. Native electronic files shall be submitted.
Task 4.10—Project Management for Phase 4
Task 4.10.1 General Management
Dudek shall be responsible for management of their staff and subconsultants and shall keep
the Sanitation District appraised of the status of their work on the project.
Dudek shall provide the key management personnel as described in their proposal on this
project. Dudek shall not reassign the key project personnel without prior approval of the
Sanitation District per Section 9 of the Professional Consultant Services Agreement. The
Sanitation District may request reassignment of any of the Dudek's or their subconsultant's
personnel, based on that individual's poor performance.
Dudek's Project Manager shall conduct monthly project meetings via telephone with the
Sanitation District's Project Manager. These meetings shall be at a mutually agreeable time,
generally around the second week of the month. The purpose of the meetings shall be to
review the Dudek Project Manager's report and the status of the project scope and budget.
Meetings should be arranged so that the progress report can be discussed at each meeting.
Other meetings shall be scheduled on an as needed basis or conducted when Dudek's Project
Manager plans to be at OCSD for other site visits.
Task 4.10.2 Progress Report
Regardless of when the monthly Project Manager's meetings occur, Dudek shall submit a
monthly progress report that will include the following:
• Work completed to in the past month
• Work anticipated for the upcoming month
• Outstanding project issues
• Status and Issues impacting project scope and budget
• Construction contract changes
• Percent complete, tabulated on a per task basis
• Overall project budget, tabulated on a per task basis
• Travel and site visit summary
June 7, 2013 Project No. P2-106
Page 6 of 10
Return to Aaenda Report
Task 4.10.3 - Invoices
Dudek shall prepare and submit monthly invoices to the Sanitation District. The invoices shall
document the resource hours and billing rate for each person that works on the project for each
task. Overhead, profit and any direct costs shall also be shown for each task. As part of the
summary section of the invoice, Dudek shall also include the following information:
• Budget
• Previous billing period total invoiced to date
• Current billing period invoicing
• Current billing period total invoice to date
• Budget Amount Remaining
• Current billing period total percent completed to date
A workbook shall be provided by OCSD that contains the required data. This workbook shall
be filled out by Dudek and submitted transmitted electronically to the OCSD Project Manager
for each invoice.
The cost component breakdown for each element above shall match that of the PCSA. The
monthly progress report shall be submitted with the project invoice as part of the monthly
request for payment.
Dudek shall also provide percent budget spent for each of the Sanitation District's cost codes
(i.e. by work package and phase). The list of cost codes by phase is included with the Request
for Proposal and included in the invoice workbook. The workbook shall be originally filled out
as the proposal matrix. The workbook is included as Exhibit B. This workbook will be
subsequently modified and used as the invoice structure to track resource hours and
expenditures against the work breakdown structure.
Dudek shall include hours for project management services including tasks that will be
performed by the Dudek throughout the construction, commissioning and closeout phases of
the project. These tasks are included in a separate section to facilitate tracking of resource
hours and fees by both the Consultant and the Sanitation District. These services include
coordination of staff and subconsultants, and project status tracking and reporting.
PHASE 5—COMMISSIONING SERVICES
Dudek shall provide commissioning services as requested by the Sanitation District.
For purposes of the proposal, Dudek shall include resource hours and fees in the Proposal for
appropriate personnel classifications to perform the following tasks. For all services, Dudek
shall refer to Engineering Design Guidelines, Chapter 01 for detailed requirements.
Task 5.1 -Assist in Start-up Services
Dudek will not be required to participate in start-up services. .
Task 5.2—Training
Dudek will not be required to provide training for the Boiler System.
June 7, 2013 Project No. P2-106
Page 7 of 10
Task 5.3— Project Management
Dudek shall also include project management support resource hours related to
Commissioning under this Phase for the subtasks described in Task 4.9 above. Monthly
progress meeting shall be via telephone call.
Task 5.4— Final OMaP
Following commissioning, the Consultant shall address, resolve and/or incorporate any
comments, additions or changes to the OMaP discovered during commissioning requiring
revision and then resubmit for review. Incorporate any final comments and submit the final
documents. Native and PDF electronic files shall be submitted.
PHASE 6—CLOSE-OUT
Close-out tasks include completion of punchlist work by the Contractor, final inspection,
completion of record drawings and electronic data. Dudek shall submit a final invoice at the
completion of the project.
Task 6.1 — Final Inspection
Dudek's attendance at the Final Inspection is not required
Task 6.2— Record Drawings
With resource hours accounted for under Site Visit Task 4.5, CONSULTANT shall inspect the
field markup set maintained by the Contractor and inspected by OCSD staff at the 50 and 100
percent completion points of construction. As part of the review process, CONSULTANT shall
verify that the Contractor's As-Built set correctly reflects the information included in the
approved shop drawings, approved field change orders, plan clarifications, plan changes and
other deviations from the conformed drawings, and that the information in the set is complete.
Based on the findings, CONSULTANT shall prepare a written report on the completeness of
the field markup set. CONSULTANT shall attend periodic workshops with the Inspector,
Resident Engineer, and Enterprise Information Management to ensure Contractor's As-Built set
contains all relevant material. Discipline engineers shall meet with the Contractor and
inspector to reconcile conflicting information and ensure all contract changes have been
incorporated.
Under this task 6.2, CONSULTANT shall prepare draft record drawings from the approved
Contractor's As-Built set for all drawings in accordance with the requirements in the CAD
Manual. The CONSULTANT shall submit the draft Record Drawings to OCSD Project RE.
The Draft Record Drawings will be reviewed for content and CAD Compliance by OCSD staff.
A comment log will be returned to the CONSULTANT and, if any comments are generated, the
CONSULTANT shall revise the record drawings and resubmit to the RE for review of the
changes and acceptance of the record drawings.
When no additional comments are identified, CONSULTANT shall prepare the final record
drawings and submit them along with the Contractor's field markup set to the Project Manager.
All record drawings shall contain a stamp indicating:
June 7, 2013 Project No. P2-106
Page 8 of 10
Return to Mende Report
"Record Drawings
These Record Drawings have been prepared based on information
provided by others. The Engineer has not verified the accuracy of
this information and shall not be responsible for any errors or
omissions which may be herein as a result."
The stamp shall optimally be placed in the bottom right hand comer of the border and may be
included via x-ref. If importing the stamp via x-ref interferes with content in the bottom right
hand corner, the stamp may also be placed in other open space along the bottom of the
border. In addition, a note shall be placed over the engineer's seal stating that"This drawing
was originally approved for construction by [name of engineer] on [date] and sealed by [name
of engineer] a licensed professional engineer in the State of California No. [License number] ".
CONSULTANT shall submit an electronic copy of the record drawings to OCSD for review and
approval. The acceptance of the record drawings shall be deemed a condition for completion
of work.
The Contractor generated drawings described in the Design Guidelines and the shop drawings
will not be updated by CONSULTANT.
The format for delivery of the submittals shall be as specified in the Design Guidelines section
titled "Software and Electronic File Format Requirements". Native electronic CAD files and
PDF electronic files shall be submitted. One set of hard copy on bond shall be submitted.
Dudek shall prepare the electronic file of the Final Conduit, Tray and Cable Schedule updated
to reflect the as-built conditions based on the Contractor's and OCSD's "red-line" drawings, and
ready to merge to Facility Model documentation (electronic media submittal is required).
Task 6.3— Final EID
Dudek shall review the EID for as-built conditions and make necessary changes and resubmit
to OCSD. The database shall be ready to merge to the Facility Model documentation.
Task 6.4— Lessons Learned
Dudek shall attend a two-hour meeting six (6) months after final payment to the Contractor to
evaluate the effectiveness of the scope of work and project management procedures and to
consider improvements for future projects. The Dudek shall prepare an agenda for the
meeting. Meeting minutes will be prepared by OCSD.
Task 6.5— Project Management
Dudek shall also include project management support resource hours related to Close-out
under this Phase for the subtasks described in Task 4.9 above. Monthly progress meeting shall
be via telephone call.
June 7, 2013 Project No. P2-106
Page 9 of 10
V. STAFF ASSISTANCE
The Sanitation District staff member or designee assigned to work with Dudek on the
construction phase of this project is Wendy Sevenandt at(714) 593-7392, email at
wsevenandtO.ocsd.com , or fax at (714) 964-4775.
WTS:eh
EDMS: 0039/5.1 a
EXHIBITS:
Exhibit A-Operations Manual and Procedures (OMaP) Content Requirements
June 7, 2013 Project No. P2-106
Page 10 of 10
Return to Aaenda Rom
P2-106 PCSA
EXHIBIT "A"
OPERATIONS MANUAL AND PROCEDURES
CONTENT REQUIREMENTS
Exhibit A
Operations Manual and Procedures Content Requirements
OCSD maintains on-line Operations Manual and Procedures(OMaP)for all collection system and plant
facilities. OMaP is designed for collection system and plant operations staff. It provides information
necessary to operate and maintain collection system and plant facilities. For collections system staff,
the OMaP serves as a procedures manual for operating and mechanically maintaining OCSD's sewers
and pump stations. For treatment plant operations staff, the OMaP is similarly a procedure manual for
operating OCSD's treatment plants. Plant operations staff does not perform maintenance work and so
typically treatment plant maintenance procedures are not included in the OMaP. Maintenance
procedures are included in the Equipment Service Manuals prepared by the Contractor.
For collections and plant projects, the Consultant-developed Operations Manual portion of the OMaP
is organized into separate sections addressing each process that is further broken down unit
processes. Enough detail shall be provided that a qualified wastewater treatment plant operator,
California Grade III or above, or similarly qualified collections system maintainer, unfamiliar with the
process, could operate the process with just the information provided. Process areas in the OMaP are
organized on the OCSD SharePoint site as follows:
• Introduction
• *Design Criteria
• c@ Theory of Operation
• Equipment Controls
• *Consultant Recommended Procedures
• ®Safety
• OTroubleshooting
SPACSD OW SOw for Co ubrft 1
12/19 11
Return to Agenda Report
Below is a general content description of all seven chapters; content may vary slightly depending on the
specific delivery need of the project. OMaP for P2-91 serves as an example and can be viewed upon
request, or a hardcopy printout can be made available.
Introduction
The Introduction Chapter shall consist of two major topics:
• Purpose
• Overview
Purpose consists of a single topic, a few sentences in length, stating the system purpose or a bulleted
list of things the process accomplishes. This section shall describe the"why" of the system or
equipment.
Overview shall provide a list of the main components, in order of flow, including upstream and
downstream process connections. This is to orient the reader as to the complexity and limits of the
system. This section shall include a brief description of the system and equipment to give a general
idea of the functioning and general layout of the facility to accomplish the purpose. It shall describe a
general perspective of the"what and where'of a system or equipment and describe how major
components function together as a system. For most systems/equipment, the overview shall consist of
a single topic.
For most processes, the Introduction chapter shall be further broken down with subheadings for each
major system of the process.
The Overview shall include graphics or schematics to enhance the meaning of the content and provide
the reader with illustration(s)of the system. At a minimum, the following graphics shall be provided:
Process Flow Schematic
• Facility Location Map
• Plan identifying the location of project(new or improvements)
• Hydraulic Profile
• Process Piping Plan
• Overview photograph of each system that supports the process
SP:OCSD Oh Psow laC uttants ]
12119WI1
Graphics/schematics provided in JPG or GIF format shall be loaded as an image on the page.
Graphics/schematics provided as PDF shall be uploaded as an object and associated to the
page.
Design Criteria
The Design Criteria chapter documents the Process Design Criteria. The process design criteria
topic shall predominantly consist of detailed process design information and basis of design, such as
flow rates,wastewater characteristics, process capacities, loading rates, retention times, equipment
information etc. If the process involves chemical application,the chemical strength, dosages,and feed
rates shall be included here. In the narrative explanation, provide a discussion as to why each
particular process element was selected. For most processes, the Design Criteria chapter shall have
design criteria information further broken down into individual tables for each major system and pieces
of equipment. Process Design criteria typically shall be listed in a table such as the one below.
[ENTER SYSTEM NAME] Design Criteria
Parameter Criteria
Ti
1
Process equipment and related details typically shall be listed in a table such as the one below.
[ENTER SYSTEM NAME] Process EquipmentlElements
EquipmentlElement ETn# lilt
ff
SP:OGSD OWP SOW f Cans ,u 9
1211M011
Return to Aaenda Rom
rt
• _ Theory of Operation
This chapter addresses the principles, assumptions, and explanation of the workings of the process or
facility. It describes the"haw'of a facility and often also describes"hoe"equipment works. Topics
cover the abstract explanation of the principles that govern the process and its subprocesses without
dealing with equipment functioning or details, except when the equipment serves to carry out the
theoretical needs of the process. This section complements other generally available comprehensive
theoretical sources.
Calculations, chemistry, formula,equation and other unusual or unique features of the process shall be
included in the Theory of Operation Chapter. Simple formulas may be typed directly in the text. For
complex formulas, create a separate graphic(JPG or GIF)file.
- Equipment Controls
The Equipment Controls chapter contains a narrative explanation of the control loop for the equipment
systems within the process, including interlocks and permissives that convey the original design intent.
For most processes,the Equipment Controls chapter shall be further broken down into individual
subheadings for each major system.
The SCADA system controls shall be included in this segment. Use the operating philosophies and
SCADA control strategies as documented in the conformed plans and specifications and the SCADA
screens for development of this material. The CONSULTANT shall obtain the final SCADA screens
from the OWNER after the SCADA System Reliability Acceptance Testing. After commissioning, the
CONSULTANT shall update the Facility O&M Manual to reflect As-Built conditions.
Provide an integrated explanation of the operating philosophy for each component followed by a control
summary table. A three column table will be provided for each piece of equipment that identifies the
"Control"or"Indicator"in the left column, its"Location" in the middle column, and a brief description (no
more than two to three lines) of the component"Function". In the"Function"column, identify panel tag
descriptors in bold (ex: Hand, Off, Auto, Remote,etc.). Include ranges and set points for each meter,
gauge, and other analytical equipment.
SP:OCSD OMeP SON/fu Cwn flan 4
12119MIl
Typical equipment controls include:
• Circuit breakers and main power switches.
• Control and mode selector switches.
• Pushbuttons.
• Meters, gauges and analytical instruments.
• Status lamps, by color.
[Enter Process Name or Equipment] Equipment Control Summary
Control or Indicator Location Function
Develop a separate table that locates equipment controls that are monitored or controlled through
CRISP. This table has two columns. The first column poses the question"Where Do I Find?" The
second column identifies the"CRISP Screen"where the information is displayed or the controls are
set. -Typical questions to answer include-Where do I find: Equipment Control Mode
• Status
• Alarms
• Feed Rate
• if interlock conditions have been met
• how to operate a piece of equipment in Manual Mode
[Enter Process Name] CRISP Summary
Where Do I Find? CRISP Screen
Note: For complex process areas that have multiple systems, a comprehensive control description
shall be developed for the entire process. A separate section for each system that supports the
process shall be developed.
SP:OCSD OMaP SOW for CwnftaM a
1211&2011
Return to Agenda Report
As a minimum the following graphics shall be included in this chapter:
• Facility Location Map of the Process
• Schematic Flow Diagram of the Process
• Panel Location Map
• Panel Photographs
• Pump Performance Curves
• P&ID
• CRISP Summary
• CRISP Screens Photographs
• Photos of installed equipment/controls with arrows identifying critical equipment and
controls
Consultant Recommended Procedures
This chapter details operating descriptions for system(s)and components within a system. It contains
multiple topics, each covering a different procedure. It contains topics covering procedures for routine
operations, equipment check schedule, system start-up, system shutdown, and abnormal
procedures. For most processes, this chapter shall include individual tables for each procedure. Below
are the specific requirements for each topic:
• Routine Operation and Equipment Check
Provide a schedule of Equipment Checks during the normal Operation/Inspection
Rounds for Operations and Collection system personnel. Provide notes or
supplementary text describing any activities that need further description to be clear.
[ENTER SYSTEM NAME] [Equipment Name] Cheek Schedule
Equipment Cheek Daily !Weekly �,MaWA* Quarterly Annual '...,
I I
SP OCSD OMaP SOW for rA halts 6
1V1QQ011
• Process Monitoring Activities
Provide a list and observation status of Process Monitoring Activities during the normal
Operation/Inspection Rounds for Operations and Collection system
personnel. Provide notes or supplementary text describing any activities that need
further description to be clear.
[ENTER PROCESS NAME] Process Monitoring Activities/Procedure
Step Observation
[ENTER SYSTEM COMPONENT NAME]
1 Entry
2 Entry
• Maintenance Schedule and Procedures(Collection Projects)
This section shall include a description and schedule of preventive and predictive
maintenance activities for Collection system personnel. The CONSULTANT shall use
the Vendor Equipment Service Manuals supplied by the Contractor as a starting point in
developing mechanical maintenance procedures, and shall refer to the reader to the tab
where these manuals can be found. A schedule of preventive maintenance activities is
created for each piece of major equipment by process area. Note that this section covers
only mechanical maintenance; electrical and instrumentation maintenance activities are
not included and are covered in OCSD's CMMS system instead.
[ENTER SYSTEM NAME]
[Equipment Name] Preventive Maintenance Schedule
Maintenance Task Daily Weekly Monthly Quarterly Annual
i {
• Start-Up Procedures
The Start-up procedures topic consists of step by step start-up procedures for
the system in two separate modes—manual and remote. Individual components shall
be addressed separately.
SP:OCSD OMaP SOW fa CwsunMs r
12I19W11
Return to Agenda Report
• Shutdown Procedures
The Shutdown procedures topic details step-by-step shutdown procedures for the
system as individual components and addresses four separate modes—manual,
remote, short-tern and long-term.
• Abnormal Procedures
The Abnormal Procedures topic shall detail step-by-step procedures for alternative
operating procedures. A typical abnormal procedure would be process operation during
communications failure or power failure.
Note: All step-by-step procedures shall identify the control panel(s) and reference control
devices necessary to perform the procedure. In general, sufficient detail shall be provided that a
qualified operator unfamiliar with the process could perform the procedure without additional
knowledge except what is found in this manual.
• Access/Maintenance:
The CONSULTANT shall also provide maintenance information that would not be
contained in Contractor supplied Vendor Equipment Manuals. Examples would include
use of cranes to remove equipment, use of doorways to remove equipment, accessing
equipment inside the manhole, maintenance required for structures, etc.
Safety
This chapter includes safety risks and concerns related to the area, processes, equipment and controls
in the project.
The CONSULTANT shall address the following:
• Identify safety hazards- Include a paragraph describing the hazard and a photograph
illustrating the hazard. Typical hazards may include trippinglKalling hazards, permit-
required confined space entry, explosive or toxic gasses, low headroom, drowning,
traffic hazards, etc.
• Characterize safety risks and concerns and recommend safe practices(specifically
related to the equipment, process and controls included in this project). Coordinate with
and, where appropriate, reference adopted OCSD Safety procedures by number and
date.
• Identify confined space and area classification
SP:OCSD OMaP SOW for Coosurants 8
1ZF19W11
• List of all safety related equipment and its location— Use the format of the table below
to identify things such as fire extinguishers, telephones, emergency
eyewashes/showers, ear plugs(for processes requiring hearing protection), methane or
hydrogen suede alarms, etc.
[Enter Process] Safety Equipment
Equipment Location
Troubleshooting
This chapter includes a process specific troubleshooting guide for the area. For plant projects,
equipment troubleshooting is covered in the Vendor Equipment Service Manual and will not be
repeated here. The Equipment Service Manuals can be added as a Related File.
Presented below is the troubleshooting guide for the [ENTER PROCESS NAME] process.
Troubleshooting: [ENTER PROCESS NAME]
Observation Possible Cause Possible Solutions
SP:OCSO OMaP SOW for Constitants 9
1V1912011
Return to Aaenda Report
Maintenance(Vendor Equipment Service Manuals)
Vendor Equipment Service Manuals are the operation, installation and maintenance manuals provided
by equipment vendors for each piece of equipment for capital projects. These manuals typically are
submitted by Contractors in electronic format for inclusion into OCSD OMaP. Where appropriate the
CONSULTANT shall reference them in the Consultant-developed operation manuals.
In cases where a Vendor Equipment Service Manual does not exist in electronic format for a spec
component but should be referenced by the Consultant-developed manual, the Vendor Equipment
Service Manual shall be scanned into electronic format and provided to the OWNER. An assessment
of such Vendor Equipment Service Manual shall be provided.This information can sometimes be found
in OCSD's CMMS database and can be provided to the CONSULTANT by the Owner tithe equipment
Loop Tag Number(s) is available.
Vendor Equipment Service Manual Assessment shall include the following:
Date:that equipment went into service. ()zlyy/=format)
Title: of the equipment manual(Example: Operation, Installation and Maintenance of Fairbanks Morse
Series F Vertical Turbine Solids Handling Pumps)
Source: The name of the manufacturer.
Keywords: OCSD shall provide a data dictionary of terms to use for the project.
At a minimum the keyword assessment shall include the project number(P1-76), project name
(Trickling Fitter Upgrade),the Design Engineer, specification section number(11117), structure names
where equipment is located (Trickling Fitter Pump Station,TFPS),equipment process descriptions,
process area location number(s), process area location name(s),equipment tag numbers
(12BPMP010, 12BPMPOl 5, 12BPMP020), manufacturer's name(Fairbanks Morse),the Asset
Description(s)from the EID(pump, centrifugal, impeller), and key process and function descriptors like
"trickling fitter recirculation pump" or "pulsation dampener".
Figures
Figures are defined as picture or drawing files that are created to clarify or illustrate a concept in the
O&M Manual or are based on simplified drawings based on the construction set. An assessment of
each figure shall be provided in an XLS file supplied by the OWNER and filled in by the CONSULTANT.
The Figure Assessment shall include the following:
Date: Figure was created or revised. (Example: 11/1)2005)
Title: Caption that identifies the figure. (Example: P2 Hydraulic Prortle).
Source: The person or entity generating the figure, normally the Consultant.
Keywords: The OWNER shall provide a data dictionary of terms to use for the project.
SP.00SD OMaP SOW far Consultants to
1W1a2011
At a minimum the keyword assessment for figures shall include the project number; project name,the
name of the firm that developed the figure, structure names, equipment process descriptions; process
area names; process area numbers; equipment loop numbers; etc. (Example: P1-76; Trickling Filter
Rehabilitation and New Clarifiers;, Black& Veatch, Trickling Filter Pump Station; Water Systems, 12A,
12B, 12C;Secondary Treatment General, TF Facilities, Blower Building Facilities; 12AF-130, 12AF-
104, 12BL-013, 12BZ-016, 12B6-016.)
Permit
Permits are binding legal agreement between OCSD and a regulatory agency. An example would be
the NPDES permit. An assessment of each permit shall be provided in an XLS file supplied by the
OWNER and filled in by the CONSULTANT. The Permit Assessment shall include the following:
Date: that permit was issued.
Title: of the permit(Example: Plant 1 Can Gen Air Quality Operating Permit)
Source: The regulatory agency that issued the permit(example: SCAQMB)
Keywords:The OWNER shall provide a data dictionary of terms to use for the project.
At a minimum the keyword shall include the permit topic(examples: air emissions, biosolids, effluent
discharge, pretreatment)and the collection system or plant process location number and name that the
permit covers, (Example: Area 16, Plant 1 Central Generation).
Training Material
Training Material consists of word processing documents(DOC, pdf), spreadsheets(xis, pdf), Power
Point(ppt), Flash or other electronic presentations that were prepared for the purpose of training OCSD
staff. Video presentations shall be provided in Flash, QuickTime, or AV format, as well as native
format if not originally in one of the foregoing formats.
An assessment of each file shall be provided in an XLS file supplied by the OWNER and filled in by the
CONSULTANT. The Training Material Assessment shall include the following:
Date: Date that training was delivered. (12101/2007)
Title: Title of the presentation, document, spreadsheet, etc. (Example: Trickling Filter Pump O&M
Power Point Slides)
Source:The person or entity creating the material, normally the manufacturer
Keywords: The OWNER shall provide a data dictionary of terms to use for the project.
At a minimum the keyword assessment shall include the training topic(s) (ex.: trickling filter pump
operation, trickling filter recycle control); the collection system or plant process location number; the
location name; the equipment loop numbers; and,for speck equipment training,the equipment loop
tag numbers.
SROCSD OMaP SOW for Conauka 11
12119 11
Return to Agenda Report
Photographs
Photographs used in the WORD document shall be provided a separate file for each photograph in
JPG format as well as native format if not originally in JPG format. The photographs shall be provided
at a resolution of 1024 x 768 pixels. An assessment of each photograph shall be provided in an XLS
file supplied by the OWNER and filled in by the CONSULTANT. The Photograph Assessment shall
include the following:
Date: that photograph was taken. (Example: ex. 08/19/2007)
Title: Enter the same caption as used in the WORD file.
Source: The photographer and photographers employer, or other source of the photograph
Keywords: The OWNER shall provide a data dictionary of terms to use for the project. At a minimum
the keywords shall include the photographer, the location, equipment tag number and name of the
equipment, (Example: Trickling Fitter Pump Station, TFP-1001).
SP:OCSD OMaP SOW for CwsultaMs 12
12 Wall
P2-106 PCSA
ATTACHMENT "D"
ALLOWABLE DIRECT COSTS
Return to Mende Report
ATTACHMENT "El"
ALLOWABLE DIRECT COSTS
i All long distance toll charges incurred will be reimbursed as direct costs. Toll
LONG DISTANCE TOLL
i charges to area codes serving Los Angeles, Orange, Riverside,and San
CHARGES Bernardino Counties will not be reimbursed.
1 FACSIMILE TRANSMISSION Facsimile transmission charges will not be reimbursed, except the long distance toll
{ CHARGES charges,as described above.
i
} In-house reproduction of records and documents will not be reimbursed by the
REPRODUCTION AND OCSD. Use of an outside copy service for specialty items and volume reproduction
PRINTING CHARGES will be reimbursed at direct cost Use of a professional printing service will be
reimbursed at actual cost
OVERNIGHT MAIL DELIVER Use of Federal Express, Express Mail, UPS, or such similarly-related service,as
AND MESSENGER SERVICE well as a messenger service,will be reimbursed at direct cost only when necessary.
POSTAGE Incidental postage will not be reimbursed by OCSD.
FILM PROCESSING Film processing will be reimbursed at actual cost
COMPUTER USAGE Computer use by Consultant and/or support staff will not be reimbursed.
MILEAGE AND TOLL FEES Per mile reimbursement will be at the current rate set by the Internal Revenue
Service. Toll fees will be reimbursed.
TEMPORARY STAFF The use of outside temporary support staff will be reimbursed at direct cost with
prior approval of OCSD.
OFFICE SUPPLIES The purchase of office supplies by Consultant will not be reimbursed.
The cost of lodging including room and all applicable taxes will be reimbursed.
LODGING Lodging incidentals including movies, intemet, laundry service, valet service, room
service, etc, will not be reimbursed.
GROUND TRANSPORTATION The cost of ground transportation for taxi, shuttle,train, etc.,will be reimbursed.
Limousine service will not be reimbursed.
Airline ticket cost including one bag will be reimbursed only if pre-approved by
AIRFARE OCSD. First class tickets will not be reimbursed unless pre-approved by OCSD.
Membership dues for corporate card frequent user programs or the cost of airline
club membership will not be reimbursed.
AUTO RENTAL Rental car cost and rental car gas will be reimbursed.
PARKING FEE Parking fees for hotel, airport, rail station, etc will be reimbursed.
Meals including tip for traveler will be reimbursed. Meals for non-traveler included
on traveler receipt will not be reimbursed. Cost of alcoholic beverages will not be
TRAVEL MEALS reimbursed. Multiple travelers must get individual receipts. All receipts must be
itemized;credit card receipts without an itemized receipt will not be reimbursed.
The daily total reimbursement for meals shall not exceed the OCSD per diem rate
which is available upon request.
Cost of miscellaneous personal items such as, but not limited to newspapers,
toiletries, shoeshine,tobacco products, pay TV, movies,valet services,health club
MISCELLANEOUS charges, in-room mini bars, clothing and footwear will not be reimbursed.
ATM/bank fees incurred by professional while traveling will not be reimbursed.
Costs for project team lunches will not be reimbursed unless pre-approved by
OCSD.
PCSA PROJECT NO.P2-106
Revis on 111312
P2-106 PCSA
ATTACHMENT "E"
FEE PROPOSAL
Return W tl R n
DUDEK
605 INOWT Street
TI".1TM,47 F760.NIR01O
T)6p.H25HJ F]60.6R.OIN
July 31,2013 Dudek PN 6705
Revised August 12,2013
Ms.Wendy Sevenarx t
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, California 92708
Subject: Proposal for Professional Consultant Services Proposal for Boiler System
Rehabilitation and Scrubbers H & I Demolition, Project No. P2.106
Dear Ms.Sevendandt
This letter responds to the Orange County Sanitation District's (OCSD) Request for Fee Proposal for
Professional Consultant Services Agreement (Request for Proposal, RFP) dated July 15, 2013 for
engineering support services during construction of the Boiler System Rehabilitation and Scrubbers H Sd
Demolition, Project No. P2-106.
BACKGROUND AND APPROACH
Dudek completed design of the subject project in July 2013,with Final Design Submittal (FDS) submitted
July 26, 2013. The FDS scope of work includes the following major elements:
• Replacement of the feedweter system with a new packaged deaemtor feedmter skid system,
complete with a manufacturer-furnished control panel and retrofit of the existing feedwawr
pump maw controls in MCC-SL;
• Replacement of the burners units for the two existing 250 BoHP steam boilers, complete with
manufacturer-furnished control panels (three total) and local starter panel to bring the boiler
system into compliance with 2015 AQMD emission goals;
• Integration of limited status and alarm signals from the local control systems to OCSD's existing
SCADA system;
• Demolition of abandoned trunkline scrubbers H & I and associated ductwork and
appurtenances.
SCOPE OF WORK
OCSD prepared a detailed scope of work for the engineering services during construction (ESDC)that
generally consists of Construction and Installation Services (Phase 4) including review of submittals,
requests for information (RFI), change order support, and construction phase meetings and site visits,
Commissioning Services (Phase 5), and Ciose-out (Phase 6). Dudek takes no exceptions to the
requested scope of work
PROJECT TEAM
Dudek proposes to accomplish the requested scope of services with the key team members that
completed the design of P2-106, including:
W W W.DUDEK.COM
• Tom Falk, PE, engineer of record and project manager will be assigned to this ESDC contract as
the Construction Phase Project Manager.
• Michael Hill, PE, lead project engineer will be assigned to this ESDC contract as the lead project
engineer.
• Romeo Flores, PE and Ninh Nguyen, the electrical discipline engineer of record and design
engineer, respectively will be assigned w this ESDC contract to support the ESDC-team with
electrical and I&C submittals and RFIs.
• Key mechanical engineering consultants, Keith Matoi (KMA Consulting) and Don King (DHK
Engineering) will be retained to provide as-needed support during the construction phase for
the mechanical system submittals and RFIs and air quality permitting.
• Steve Deering, PE, Dudek Principal-In-Charge for the P2-106 project will continue in that
capacity for this ESDC contract
• We have also included in-house support staff,Jane Costello (civil engineer), Nikki Hunter (Sr.
Designer), Kris King(CADD Drafter),and Pam Bristow(Administrative wpport)to support the
ESDC team as required to accomplish the requested scope of services.
SCHEDULE AND BUDGET
The P2-106 Construction Documents specify a12-month contract duration. We understand that the
project will be publicly bid in August and that construction is expected to commence prior to the end of
2013, with substantial completion expected prior to the end of 2014, The requested scope of services
are expected to be accomplished within that timeframe.
We have prepared our fee estimate in the Excel spreadsheet matrix by task, as provided in OCSD's
request for proposal. Attached to this letter Is the fee summary in the requested table-format The
completed Excel spreadsheet fee breakdown matrix will be provided electronically.
If there are any questions or 9 additional information is required, please do not hesitate to call or email
me at 760.479.4149 or tfalkOdudekcom
Sincerely, I` ^
V�
Tom Falk, PE
Project Manager
Attachments:
I. Fee Estimate Table
D U D E K P2-106,ESDC Proposal
2 July 31, 2013
Revised,August 12,2013
Return to Agenda Repon
Fee Proposal Letter Form
Project P2406-Boller System Rehabilitation and Scrubbers H S I Demolition
Consultant Services Including:
DUDE
Raw Labor $ 61,556
Fringe Rate%(Raw Labor x%) 47.1% $ 28,993
Burdened Labor(Raw Labor+Fringe Rate) $ 90,549
Overhead(%x Burden Labor) 90.55% $ 81,992
Subtotal $ 172,540
Profit(Overhead+Burdened Labor) 10% $ 17,254
Total Direct Cost, not to exceed $ 5.708
Subotal-Dudek Consulting Services, not to exceed S 195.502
Subconsultanl Services:
(Section used for Subconsuhant fees greater than$100,000)
Not Applicable $0
(Section used for Subconsultants under$100,000)
KMA Consulting(Mechanical Engineer) $ 6,000
OHK Engineers(Mechanical/Air Quality Engineer) $ 5,000
Engineering Partners, Inc. (Electrical Engineer) $ 16,000
0 $
0 $
0 $
0 $
0 $
Subtotal Subcorisultant fees at hourly rates,not to exceed $ 27,000
GRAND TOTAL for Consultant Services,not to exceed: $ 222,502
Fee Proposal Letter Form
Project P2-106-Boller System Rehabilitation and Scrubbers H S I Demoll0on
OCSD
Manual
Consultant Services Including: rounding at
each
DUDEK calculation
Raw Labor $ 61,55576 $ 61,556.00
Fringe Rate%(Raw"bar x%) 471% $ 28,992.76 $ 28,992.08 $ 28,993.00
Bunlened"bar(Raw Labor+Fringe Rate) $ 90,548.52 $ 90,549.00
Overhead(%x Burden Labor) 90.55% $ 81.991.69 $ 81,992.12 $ $1,992.00
Subtotal S 17$540.21 $ 172,541.00
Pratt(Overhead+Burdened Labor) 10% $ 17,254.02 $ 17,254.10 $ 17,254.00
Total Direct Cost,not to exceed $ 5,708.00 $ 5,708.00
Subotal-Dudek Consulting Services,not to exceed $ 194502,23 $ 195,503.00 3.05 muiWmr
Subconsultant Services:
(Section used for Subconsuhant fees greater than$100,000)
Not Applicable $ - -
(Section used for Subconsuaants under$100,000)
KMA Consulting(Mechanical Engineer) $ 6,000.00 $ 6,000.00
DHK Engineers(Mechanical/Air Quality Engineer) $ 5,000.00 $ 5,W0.00
Engineering Partners,Inc.(Electrical Engineer) $ 16,000.00 $ 16,000,00
0 $
0 $
0 $
0 $
0 $
Subtotal Subconsultant sees at hourly rates,not to exceed $ 27,000.00 $ 27,000.00
GRAND TOTAL for Consultant Services,nnt to exceed: $ 222,602.23 $ 222,503.00
PROPOSAL WORKS- Return to Aaende Rom
Dudek F1OSQ
605 Third Sheet
Encinitas,CA 92024
i
5222.5022i
Orange County Sanbabon District
P.O. Box 6127
Fountain Valley,CA 92728-6127
ATTN: Lisa Rogers,Accounts Payable
cc:Wendy Sevenandt,CIP Project Manager
Project P2-106-Boller System Rehabilitation and Scrubbers H 81 Demolition
f"�mff�DPLnma- -DnterNo.';-�-
SUMMARYCORTRACTSTATUS
Pravbusly Remaining %
DUDEK Butlgat Amaum Billed This Period TO D.W Bud et Com lets
Labor+OH 5 1]2,540
Pmfl s 17,254
Dlred Costa $ 5,708
Sabconsaeaft S 2].00v
Total 5 222,Se2
Pnviousy
Work Package 0escdp0an Budget Amount Bllletl TKU Periotl TO gets as
Com late
3350 Consu noNlnstallation 5 164203
3130 mmissionin Services 5 15,251
3550 poseoul 5 23,038
Total a M 502
IPA
PToJoct PY-1e6-Boller System RehaEilgaBon and ScmbWm H S I DamoliBon
TAEK-BY-TASK HMXCE SN RY
Budget PreW
E
olnly Remeinlnp
Taaa Re. Anewm Bllbd Tnk Period To Oet¢ Butl et %ComPlal¢
e.t P1ewIMEumon CaMamw S
U SOmXW¢ 22,511 S
eJ R wabO Mo MllKOtmalon 18e25 S
_ /A Coads end CO S U.400 S
A5 S Vw eM Wee Meeli 22M2
Cla / R a.6 ma Aw,Un ullon E - E
a] Aewmmiunn E 1e913 E
f a.6 OWP E 3]H2 E -
4.10 Manage 15620
aM
Wad, Sandnoa
Budgat P A.tsly TMe ftM TO Dab 0.emanlrp %C.*w
Taaatb. n AmwM Blind Bud
5.1 NWINh &Niee - E
5.2 T E E
9 E 4061 S
5A F W WP g
wnkp
Ob 261
Budget Prerioefly Thls Period TODab Reme1e4p ,L COn10,a,a
T+M Mo. I1mouM Billetl 8u
6.1 FUWI $
62 RaixtlDanOnaa S 1¢132.17 S .
6.3 FYW Nvunenle6rn E 36a.]a $
BAN.
E 1 R E
ES E 2900.]5 3
A36
R t t o tl R tl
Role Name Rate
Prin En f -Steve Deerin - 9973
Pro Mar Tom Falk 89.82
Pro En r Michael Hill 48.06
sr En r Jane Costello 81.3.
Desi nerICAD Nicola Hunter - 52.9B
Drafter - Kris Kin 3825
Admin Fam 6r,9tew 35.3c
TBD
TBD
TBD
OVERHEAD AT% 90.55%
PROFIT AT% 10-.00%
7{e
p3
8
t
P
9 Pro)ect PY-106-Boller Svatem Rehablilte0on antl Scrubbers X 8 I DemollUan
WORK PACKAGE 3350-CONSTRUCTION AND INSTALLATION SERVICES
TASK 4A-PRECONSTRUCTION CONFERENCE
INVOICE DETAIL
Pro En r $9.73 $ -
Pm r $ W. $
Pro En r $ 48.00
S,Engr 81.33
DBEI nod $ 5288
Drafter 38.2E
Atlmin $ 35.3D
TBD
D $
T80
$
a
$
Tool WnbouNBUNanetl labor Coab D.ODIs
OVERHEAD AT% D0.55% $ -
PROFITAT% 10.00% $
TOTAL LABOR COST
MRECT�PENSES MS PERIOD
"DIREOMMUS "
Or .1malvother Obecl ACWeI WA
Printing B Phofo Dl.m A al WA
Travel Direct A 81 WA
Telephone I Direct I A ual I WA
Tool mrsct Ea lase
Pravleuaiy This MKotl TO Dab RemalnlnS %ComPle
Billed Bud e[
LabonOH Is
Prsa
Dlrsot Doela
romi $
Return to Aaenda Report
Proposed Budget
�IT VPIW Dais'. ih.
redod EnCicg: 1'Oq
PIt t P2403.Boger System Rehabilitation and Scrubbers H&I Demolition
WORK PACKAGE 33W-CONSTRUCTION AND INSTALLATION SERVICES
TASK 33-SUBMITTALS
INVOICE DETAIL
PM EM f W." ]Wa1
r f 89.32 0: f 3.M n
f aea +".M
St f a1.33 :,.: 1c,c3 3133E
R.% 2M -^ f 105.91
4allar f 3325 : v .. s 73./3
AdnYn f 33D 90 �n f T0.31
f
TBD f
f
i
f -
f
Totel llaNiau labor taut 1N.OD f 1 T3
OVERNEADAT% 30.55% f 9.29293
PROMAT% 10.00% 1,933.5a
TOTALLABORCOST 4 21,511.19
u
OMa&YBOgw C4eH Aqual WA
&PMb CaBU ACWeI WA
TmAW Dheol Acmal WA
Telephone Dena Arbral WA
To41 Ding 1,033.00
Previously This Period TO Date Remaining %
&fled Rud at Com late
labw�dl IS,&%
PMt IF 1 m
D4aGCoete i 1,000
To a
Project P2106-Boiler Syafam Rehabilitation and Sembbers H S I Demolition
WORK PACKAGE 3350-CONSTRUCTION AND INSTALLATION SERVICES
TASK 8.3-REQUESTS FOR INFORMATION
INVOICE DETAIL
I LABOR COSTS THIS PWWOD
TBD 7Rin Engr 0.73 S 398.%
Prj Mgr f 80M f 3,51111.77
PM EW It a8.08 f 381A81
SrE i $IXI f
DesignetWD SZ98
Moan W
Ad .30
TBO 35 f
It
f
f
f
f
f
f
S
S
TOW fMnaouaiBONsnM laborCMb 1f8.00 i T
EMe %
PROFIT AD AM 80.55% f 1,03.21
PROFIT ATX 10.00% i 1,89JR1
TOTAL LA60ft COST f 18A3620
T
OA P or Direq AchW WA
Printing
&8 Pho hoto Direct ACWN WA
Tre�el Direct I MVAM WA
T one Direct AcaW WA
- Mel Direcl Ex noes S
sUMMARYTAYK
STATUS
LaOonOH S 14.= It
Prefi[ is tA9B I f
DlreclC S f
TMI S 1 S
Return to Aaenda Report
Project P2406-goiter Svetam Rehabilitadon and Scrubbers H M Demolition
WORK PACKAGE 3360-CONSTRUCTION AND INSTALLATION SERVICES
TASK 4.4-CONTRACT MODIFICATIONS,DESIGN CHANGES,AND CHANGE ORDERS
INVOICE DETAIL
PM Ear f WM f 30B."
f 00.82 f T106Ss
PrQEw f 46.03 f t m
&EW 01.33 f
Ges f 5200 10%12
Dndter f 362$ 764.02
Admel f 36.30 35104
TSD f f
TBD f f
TBD f f
i
f
s
f
f
7
f
f
f
TetY WnMmalBurderod LeOorCab 170.00 f 11
OVERNFADAT% 0D.s6% f 10,M.73
PROFlf AT% MIX% i ZIZB.M
TOTAL LABOR COST f 2a.Ne.96
DIRECTEXPENSES THIS PEMOO
OKceIMaNOMer D'rect Actual WA
Pdrdi f%wlo DYeG Aolual WA
Travel Di Actual WA
Tele M1 Direct Actual WA
Total DInW Ezooness
TATUS
LQWq CM IS nX41 f
Pofi is 2 f
Ouw 1$ s
T f 26a30 15
Project P2408•Boller System Rehabilitation and Scrubbers H S I Demolition
WORK PACKAGE 3350-CONSTRUCTION.AND INSTALLATION SERVICES
TASK 4.5-SITE VISITS AND WEEKLY PROGRESS MEETINGS AND AS-BUILT REVIEW MEETINGS
INVOICE DETAIL
PERIOD
E $389.18
F 48. 3844.61
81
Desl nerWIADS S
Drafter $ 38 $
Aornn $ 35 S
TBD $ $
t TBD $
TBD s s
i
a
a
s
a
a
a
Total ManhouraSurdenedLeberCosb 140.00 z31711
OVERHEADAT% 80.88% $ 8,381.17
PROFRATX 10.00% $ 174SA9
TOTAL LABOR COST
DIRECTEXPENSES THIS PERIOD
OfIWMai110lher Direct Actual NIA
Nning 3 Phato Direct Acual NIA *. u.
T.W I Direct Actual I NIA _
Tele hone DireIX AIXual WA
TotalDirect Ex enses 2,688.00
SUMMARY TASK STATUS
La10H $ 17,595 $
Direct Costs
---Totail 4 22,062 1 $
Return to Aaenda Report
si _osesl Budge
Pmjeel P2-106-Boiler Syatam Rehabilitation and Smobbera H&I Demolition
WORK PACKAGE 3350-CONSTRUCTION AND INSTALLATION SERVICES
TASK AB-CLAIMS AVOIDANCE AND DISPUTE RESOLUTION ASSISTANCE
INVOICE DETAIL
LABOR COSTS IMIS PERIOD
o 1
Prn 99.73 f
S 89.82
S 48.00 S
Sr Engr S 81.33 - - -
rw/GD S 52.98 s
Draft f 38M - f
Admn f 35.30
S
TBD $ S
7BD S
s -
f
s
Toll Manhoumilkwdened Labe Ceab 0.00
OVERHEADAT% 90.55% f
PRORT AT% 10.OD% S
TOTAL LABOR COST
PENS ST IS
DREOEE%.
--ORrcelMail101Mr Dbetl 1Atlual F
Pnm &PMto uaaM AceW Te Dintl
Toll DInW ExpansesSUAMIARY TASK NATO
Law+OH $
Prom S
Dueticoala 11s
T
Protect PL10S-Biller Svst9m R9hadNlapon imi Scrubban N 81 DBmolXlon
WORK PACKAGE 3350-CONSTRUCTION AND INSTALLATION SERVICES
TASK 4.7-PRE-COMMISSIONING
INVOICE DETAIL
OSTS rRIS PERIOD
I
Pon En r S BBS3 S m&94
P M r S B9.B2 i 2156.66
PM Enor a 49.06 S 9814.81
Sr En r 91.33
D.,,./CAD D.,,./CAD 52,BB a
DreXer a 38.25 a
Mmh am
MD
TSD a i
Tao a
s
i
a
a
s
s
s
Total Menhounlaunfemtl Lahortaatx 100.00
OVERRMDAT% 90.55% 3 S,TNAB
PRONTAT% 10.00% 3 1319M
TOTAL LABOR COST t0A13.05
SAL`
OMcerMaWOMer pIn1Q el NIA �a.9 Nxwx +,sx�y'
PtiMln Phalo Oka41 AONN NIA SS " Yt'.;"'
Travel Dxao1 Amaw WA ;3;,.: ':z,
TeIB ne -42
DM Adel NIA
Tobl Dlrad Ex xM S 1,600,001
SUMMARYU
LabOrrcOH S 12,194
Profl S 0
: DheM CONa S 1,%0
: Total 10.Bt
Return to Aaenda Rewd
f
Project P2.106-Boiler Swwm RehabilihDon and Sambbers H S I Demolition
WORK PACKAGE 3360-CONSTRUCTION AND INSTALLATION SERVICES
TASK 4.8.OPERATION MANUAL AND PROCEDURES
INVOICE DETAIL
Pdn f III so so
68921
592.77
f f 3 MJZil
Sr r S$1.33zos $ 3 5326
Oes" after S 52.68 1,U59.12
Arm $ 16 S T64.92
08
Admen f 35.30 ]06.08
TOO f f
TBD f S
{ TBD E f
1 f
f
S
S
f -
' S
S
- Total MBnhoVNeVIWMdLaborCwb 308.00 f 17 86b.24
OVERHEAD AT% 90.55% f 16,175.16
PROM AT% 10.OD% f 3,403.84
TOTAL LABOR COST f 37,"2.23
EXPENSES THIS PERIOD
OMceWaW7PW Dveq Actual NIA
B more Deep Actual WA
Travel Direct AOLeI WA
T Oeect I Aural I WA
TeblD gummimAy TASK STATUS
Lebor•ON $ 34,038
Pr0fa S 3,404
Deed Coale f
Tolall 37,A442
Project P2-106-Boiler Syabm Rahab8lGtion antl Scrubbers H d I Demolition
WORK PACKAGE 3350-CONSTRUCTION AND INSTALLATION SERVICES
TASK 6.9-EQUIPMENT AND INSTRUMENT DATABASE)EID)
INVOICE DETAIL
LABORCOSMYNISPAMOO
ew 99.
Prof MW 8922 1&55
5 A6 5
sraw 1
DasigrnrACAD 5 52
Drafter
Admin 5 35.30
TOO
TBD
TBD
5
5
5
5
TOW ManhounVBurtlan9d La00r Coati 80.00 77t70
OVERHEAD AT% 90.56% 5 3,783.81
PROFIT AT% 10.OD% 5 796.25
TOTAL LABOR COST 87W 76
DIRECT EXPENSES THIS PERIOD
o DIRECT E%PE S_.:. HA OE il 1,RK , TT +^- ^-,-
Of(me/l taiVO1lWr Direct Actual WA
in 8 Hh 0 Direct ActualI WA
Travel Dlrect Acual I WA
Tek rre Direct I Aduel I WA
' Tobd 5
SUMMARY TA KSTA
WWI
Labw�OH $ 7,963
$ 96706
PmN
DlrectCwta $
Total 8,759
Return to Mende Report
ProW P2-106-Boiler System Rehabilitation and Scrubbers H&I Ds Iffion
WORK PACKAGE 3360-CONSTRUCTION AND INSTALLATION SERVICES
TASK 4.10-PROJECT MANAGEMENT FOR PHASE 6
INVOICE DETAIL
LABOR COSTS THIS PERIOD
Pdn .73 f 1,19fi.81
Pro]Mar3 W.82 3 5,388.1fi
af. f
S f elm
52.95 f
Ondler f W8
Mmin W.W f 705.05
TBD f
TSD f
TED f
f
f
Trial WnhauN&WarotllaOor Cosh 92A9 3T
OVERHEAD AT% 90.55% f f,f02.94
PROW AT% 10.W% f 1,3f9.50
TOTAL IA5OR COST 16,254A5
DfRiFCr E PEN ES THIS PERIOD
ONrelM.VOMer Dlrect 1 Actual WA
Prirr9n S Prow IDiredI Acluel I WA
TmW IDuetI A WA
Telephone I DOad I MOW I w
Total Direct Experwasf tN
LabanOFi f 13,895
ProfR f 1,389
O'verA Cogs is 338
TMII$ 15,320
WORK PACKAGE 3450-COMMISSIONING SERVICES
TASK 5.1-ASSIST IN START4JP SERVICES
INVOICE DETAIL
m $ Wn F�
Proj Mgr $ 80.82 ' [�
_ 35.30
mE�
TBD
'F$�
0®
TOTAL LABOF[COST 4
p A�.l 1 WA "n _a`�ia�
Teftp� I MA
F�
F�
E�
Return to Mende Report
Project P2.1%-Boiler System RehabllkaBon and ScmbWm H S I CemolMon
WORK PACKAGE 3450-COYABSSIONING SERVICES
TASK S.2-TRAINING
INVOICE DETAIL
1
P cl i i U ai..T3 -
mw 02 1
s
3Prj EW i
Sr Stow i
S it33 i
Oesl nerKAD i S
Droker U 25
MJ -
D i 9&W a
590 - - a -
TB i
TBD s a
Teo i S
i
—_ i
— a
-- — $
s
-- s
s -
s
s
s
s
s
Tblwl lftahaansaWenetl labor coon 0.00 s
oVERIB:ADAT% e0.55% $ -
MCWTTAT% 10.00% $
TOTAL LABOR COST
&RECTE)CPENSES THISPEMOD
.' Eo6 TOTAC�-
.wlMaluO Dlwp iMAW WA 5
B PMto 1 .1. 1MAreI WA 3 -
Tm.N I Dheq I
TI Deed I M0W 1WA 5.
oWux1 S
SUMMARYTASKSTATUS
- Bud,.f Prew telY'' ThS Periotl ft
Amount f BIfetl � I TO Date Butl xt.--.ry ate
LacorvOM 5
Profit S
Dve Cab S
Tabl
Projaet P2.106-Boller System Rehabllkatbn and Scmbben H 6 I DemolMon
WORK PACKAGE 3460-COMMISSIONING SERVICES
TASK 6.3-PROJECT MANAGEMENT FOR PHASE 6
INVOICE DETAIL
f
3
Rln En 4 BB.T9
3 P rci Mar 90.82 1T60.96
r 4 40.06 i
7 Sr E 4 61.33 $
1 D netlCAO $ 62.95 i
DI 3025 i
Admb i 96.90 14122
y' TBD i
TBD
TBD a s
3 a
i
i
a
a
$
$
Tote!MBnh..M dena6 Labor Coe% xw $ 1e31.W
OVERHEADAT% No% $ 1,T60.66
PROFITAT% 106e% $ 360.21
TOTAL LABOR COST $ 4,Wl.31
���yy�� DIRECT EXPENSES THIS PERIOD
OHlce/Ma1/01hOr Dyeq AabW NlA
Println &Photo Watt ACbe! NIA .10 Y„v
Tre.l Dluat Actual NIA
Tel hang Dhecl I AMual NIA
Tatar Direct E.pe.eea $
SU Y 3TAWS
c
LBbnOH a 692
PWO $ 96a
Direct Coats Is
Tolll 5 4,001
Return to Aaenda Report
Project PL10s-BoiNr System RebabilK m aM Sorobbem H 81 Demolblon
WORK PACKAGE 3480-COMMISSIONING SERVICES
TASK SA-FINAL OMAP
INVOICE DETAIL
H0
_ P.Ew Is wn ZOa E 188.p
Prollft Is mm ='- E flB56
P E $ BOB = E 1 St290
Sr $ al.w ccri7 E stS.32
Dmq� i E298 :'.
OreRer i E8.2E = S 382a8
ArBrin i EE.EO
Teo s s
E
s _
r-- s
s
$
� s
s
s
s
s
' s
s
s
s
s
Taal MaMoert9uNwaE labor Car I MIX 1$ 4.M.14
OVFAKEADAT% WEE% $ 3,974
PROFITAT% ta.W% $ mm
TOTAL LIBOR COST s 9.1mum
pRECTEJmE STHISPEWOD
016mIMasOBs DYtl ApW WA
pftmP OYaa AWaI WA
Tmrel DiaC AroBI WA
T FMerl Atlul N/A
TaY OYECt s
SAIMARy TASK ST TIS
labor�OH S 89w
POM1 E e38
Direq Cab E
Tafelj E 9,3a
=d P2-1 W-Balky System Rehabilkalim and Scmbbem H i I DemolRion
WORK PACKAGE 35W-CLOSE-OUT
TASK 6.1-FINAL INSPECTION
INVOICEDETAIL
� T
PMI $ 99.1E Fi
PM MW s ESAS No E S uae Sr 7 SIM -s W.Es ": -,AM1OIn S E5.W —STOO s
s
s
TaW MnhOun9aNallaS Lebo COW O.W
OVERHEAD AT% W.S S
PROFITAT% lo, % S
TOTAL LABOR COST 5 -
DIRECT EXPENSES THIS PE V
OIfiWINeIVOiMr O'vetl AchW WA
ftroy EPhgo Dial AqW WA
Tm Wxl ADN WA
T Oireol ArbW WA
TOW Dbec i
SWMARYTASKSTATUS
Iabare011 S _- -
PmN i
OSeMCoeb s
Total i
Return to Mende Report
Project P2-106-Boller System RMabilitation and Scrubbers H&I Demolition
WORK PACKAGE 35N-CLOSE-OUT
TASK 6.2- RECORD DRAWINGS
INVOICE DETAIL
PdnEwi W. 9
pra Mar i BB.62 $
358aS
PM Ew i am s 1 90
Sr 0 61.30 s
f $ 52.06 i 11a21
OrsRer i 36.25 i ]8
Adrfn s 35.00 - -- S
TBD s s
TBD s — ', s
Y TED f s
s
, s
s
s
s
s
s
s
s
z
s
s
Tad WnhauaAyln6erW labor CateI 1M.00 f "WWI
OVERHEADAT% W.56% f aes1.M
PRROFlTAT% 1000% $ 1,226.66
TOTAL LABOR COST s 114=17
pRECT EXVEN3Ef TI tl s VERIOD
ONNMefVOar Dien Atlul WA
Pnntm&Pn,*o I Died AdWif WA
Trutt DYert Acnal WA
Tewphoo, Brat AcOY WA
Tad 011eel f 100A0
UYYARTTAS AT
Iaba+011 z 1 TS]
Pn#e i 1218
11YeGCaeb s tap
Tad f I'd
Proleo P2-106-Sollx System abilfatlon and Swebbem H i I Demolition
WORK PACKAGE 3550-CLOSE-OUT
TASK 6.3-FINAL PROCESS CONTROL STRATEGIES,EID
INVOICE DETAIL
LASCR m THIS PERT
PM Ew i 99.73 S
_ Frei my i 89.82 i 959T8
i 48.w f Me.92
SrEW S 81.33
S SZW s
Dwbr s 88.25 i
AtlMn s W'W s
Teo i t
TBD i s
MD i S
i
i
3
s
s
i
S
s
i
S
s
i
i
- row wnnomvsamanae Leborcaer ziAB s tt28.30
OVERHFADAT% W.55% i 1,021.88
M,DRTAT% 10.00% i 21ais
TOTAL LABOR COST 8 ;36ATf
DIRE T EX EN
Ctice/MeIIIDoo Dl M"W '-
Tra t 6 P5Mo Direct AtlW
TMW Dveb Atluel WA
T DiedI AtlW I WA pwl
Tool Dilvcl MN S ~
A
N 3 2,150
Pmfi s 215
Direct Coati Tabsa
i 2,
Return to Mende Report
Project P2-106-Boiler Salem RehabilSadon and Scrubber N 61 Demolrtlon
WORK PACKAGE MO-CLOSE-OUT
TASK BA-LESSONS LEARNED
INVOICE OETAIL
LABOR COSTS THIS PERIOD
_ EE11 BUROENED
TE"'- NOLRS _
Pm EII r EH W.73 __ a
PM My S 09.B2 S 359.20
PM FM E 66.06 _ E 192,23
SrE r IF 81.W •-: - 5
panilrerICAD E IMM - $
P fer a 3025 -zr -- a
aemin a 3S.W -. a
Tao a - _. _ _. a
MD s __ $
MD
a
- a
-- a
-_-_ a
a
a
E
E
E
a
a
TOW WNweraAluEnaa Labs Combs f SS1S1
EMe
PV T A % lo(MWSM a O95.39
PRORTAT% 10.00% i 10 99
TOTAL LABOR COST E 15a,1 .99
DIRECT EXPENSES THIS PERIOD
r^-OU
ORMAeYJtltlr1 Direct AWeI -WA
8 PI1rdO Direct ANaJ WA
Tnnal OYM AceWI WA
T Dta'X AC6WI WA
TaY OIIaR a 81.00
labpaOH i 1.051
a 105
fmb 84
TObI a 1,
WORK PACKAGE 3550-CLOSE-OUT
TASK 6.5-PROJECT MANAGEMENT
INVOICE DETAIL
LABOR COSTS TMISPERKM)
PM MIX ma
s no
.0
A®
dam,: .
--- $
--- S
-_-_-_ 3
-�
V� 0WA > ,;":
Return b Aaenda Report
Orange County Sanitation District
Project P2-106 - Boiler System Rehabilitation and.Scrubbers H & I Demolition
Subconsultants
PHASE
1 -3 4 5 6 Total Cost
Subconsultents
KMA Consulting(Mechanical Engineer) $ 5,000 $L000 $ 6,000
®HK Engineers(Mechanical/Air Quality Engineer) $ 5,000 $ 5,000
Engineering Partners, Inc. (Electrical Engineer) $ 12,000 $1,000 $3,000 $ 16,000
S
$
$
s
s
P2-106 PCSA
ATTACHMENT "K"
HOURLY RATE SCHEDULE FOR
MINOR SUBCONSULTANTS
KM4 CONSULTING
1 OONSYLTINO M{C NANIOAL 6N CIN llXS
125 E.64v 5M1a1,Sti C Me®,01:62-Mb26
26
Eu: ma>ss2-nee
gym,Mama nil
RATE SCHEDULE FOR P2-106,ENGINEERING SERVICES DURING CONSTRUCTION
JULY 29,2013
Principals $250.00 per hour
Associates $ 175.00 per hour
Engineers $150.00 per hour
Designers $ 110.00 per hour
DraftspersonfTechnical Typist $ 75.00 per hour
RATE SCHEDULE
P2-106 BOILER REHABILITATION PROJECT
Mechanical Engineer $155/hr
DHK ENGINEERS INC.
1851 Skyhill Place, Escondido, CA 92026
(760) 747-9553
Return to Agenda Report
EPI (859)824-1761
TBE ONSULTINGEAG NEERT ,INC.CO.NSULTIA'G EACENEERS95651PAPLES STREET,SUITE IN
SANUIECC, CA 92121
F.VV(858)81C-1168
FEE RATE SCHEDULE
Rate Category Hourly Rate
Principal $175
Project Manager $145
Staff Engineer $125
Designer $110
Drafting $ 80
Administrative $ 65
OPERATIONS COMMITTEE Meeting Dare TOBA.Of DIr.
10/02/13 10/23/13
AGENDA REPORT Item Number Item Nu bar
8 13
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Nick Kanetis, Director of Engineering
CIP Project Manager: Hardat Khublall
SUBJECT: BITTER POINT FORCE MAIN REHABILITATION, PROJECT NO. 5-58
GENERAL MANAGER'S RECOMMENDATION
A. Approve a budget increase of $390,000 for the Bitter Point Force Main
Rehabilitation, Project No. 5-58, for a total project budget of$46,219,000; and,
B. Approve an increase in contingency of $89,445 (15%), for a total contingency of
$149,075 (25%), to the Professional Consultant Services Agreement with Black
& Veatch to provide construction support services for the Bitter Point Force Main
Rehabilitation, Project No. 5-58, to support the Santa Ana River Levee and In-
Plant Repairs, Phase 2.
SUMMARY
This is the second phase of a two-phased project to mitigate settlement along the Santa
Ana River Levees at Plant No. 2 that resulted from the installation of a micro-tunneled
casing as part of the original Bitter Point Force Main Rehabilitation, Project No. 5-58.
These repairs are a follow up to the Phase 1 emergency repairs project completed in
2011.
Responsibility for the costs associated with repairing the affected soils is under dispute
with the Contractor, and the parties are currently litigating this issue. The Orange
County Sanitation District (Sanitation District) will pursue cost recovery for all incurred
costs.
Black & Veatch is currently assisting the Sanitation District by providing construction
support services which include construction monitoring, geotechnical inspection and
testing, reviewing submittals, answering Contractors Requests for Information,
reviewing design changes, preparing record drawings, and closeout of the project.
The work schedule has changed as a result of additional unknown site conditions as
well as an environmental delay due to nesting birds in the work area. This delay has
resulted in the acceleration of the construction schedule, including working on
weekends to meet deadlines to complete all Santa Ana River work by October 28, 2013,
before the winter rains arrive.
Page 1 of 3
An increase in contingency is needed to account for the additional level of effort
required by the Consultant to support the extended construction schedule, and an
additional value engineering analysis requested by the Sanitation District that resulted in
a reduction to the construction contract value with the Contractor.
Additional staff budget in the amount of $300,555 is also required for the Sanitation
District to support the extended construction schedule and the overtime work needed to
finish the levee work, as well as time needed to support the litigation and dispute
resolution process.
PRIOR COMMITTEE/BOARD ACTIONS
January 2013 — Approved a budget increase of $95,000 for a total project budget of
$44,385,000, approved a Professional Consultant Services Agreement with Black &
Veatch to provide construction support services for an amount not to exceed $596,301,
and approved a contingency of$59,603 (10%).
ADDITIONAL INFORMATION
The design and construction restoration work has been implemented in a phased
approach. Phase 1 was completed in 2011 under emergency authorization with Phase
2 currently underway.
The construction schedule for the Phase 2 Santa Ana River Levees has been hampered
by changed site conditions that could not have been contemplated in the initial design:
1. The existing west levee of the Santa Ana River was covered in a layer of concrete
below the existing river surface. The Contractor was required to break and remove
this concrete layer prior to performing contract work. This concrete was not shown,
nor was known prior to the removal of the existing rock layer of the levee. This work
was a delay to the critical path for the project.
2. A federally protected bird species was nesting along the river in the vicinity of the
east Santa Ana River Levee work. No work is permitted within 500 feet of the nest
and the work could not commence in this area for several months until the nest was
vacated. This became a significant delay to the start of the work at the east levee.
As a result of these delays, the levee work was extended by a month. Construction
activities have been accelerated by working seven days a week in an extended daily
schedule to meet a revised October 28f" deadline dictated by the US Army Corps of
Engineers and the Orange County Flood Control District that have jurisdiction in the
river.
Additionally, the Sanitation District discovered an opportunity during construction to
reduce restoration in non-critical areas within Plant No. 2 in order to reduce costs. The
Sanitation District requested the Consultant to perform additional assessments of the
proposed repairs in these areas. While this did add to the cost of the Consultant
agreement, this resulted in a contract savings of nearly $300,000.
Page 2 of 3
CEQA
The Final Environmental Impact Report (EIR) for the Replacement of Newport Trunk
Sewer and Force Mains, Project No. 5-58, was certified by the Sanitation District's
Board of Directors on April 27, 2005. The Notice of Determination was filed with the
State Clearinghouse on April 28, 2005. Addendum No. 1 to the Newport Sewer and
Force Mains EIR, for the implementation of the Emergency Repairs to the Santa Ana
River Levees, is retained in the Sanitation District's official files for internal reference.
The Phase 2 restoration of the Santa Ana Levees required preparation of a California
Environmental Quality Act (CEQA) document to implement the work. The restoration
measures, however, do not result in any new or substantially more severe significant
impacts that were not previously considered or addressed in the 2005 EIR or in
Amendment No. 1. Therefore, an Initial Study/Mitigated Negative Declaration document
was prepared in accordance with the conditions described in Public Resources Code
Section 21166 or CEQA Guideline Section 15162 requiring preparation of a subsequent
EIR or negative declaration. The Initial Study/Mitigated Negative Declaration was
certified by the Sanitation District's Board of Directors on December 21, 2011.
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
This request complies with authority levels of the Sanitation District's Delegation of
Authority. This item has been budgeted and the budget is insufficient for recommended
action (FY2013-14 Update, Page A-7).
Date of Approval Contract Amount Continaencv
01/23/13 $596,301 $59,630(10%)
10/23/13 $89.445(15%
$149,075(25%)
HK:dm:gc
Page 3 of 3
ITEM NO. 14
MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATION COMMITTEE
Orange County Sanitation District
Wednesday, October 9, 2013, at 5:30 P.M.
A regular meeting of the Administration Committee of the Orange County Sanitation
District was held on October 9, 2013, at 5:30 p.m., in the Sanitation District's
Administration Building.
Following the Pledge of Allegiance, a quorum was declared present, as follows:
COMMITTEE MEMBERS PRESENT: STAFF PRESENT:
Brad Reese, Chair Jim Herberg, General Manager
David Benavides Bob Ghirelli, Assistant General Manager
Steven Choi Lorenzo Tyner, Director of Finance
Tyler Diep & Administrative Services
Jim Ferryman Jeff Reed, Director of Human Resources
Peter Kim Nick Arhontes, Dir. Of Facilities Support
Prakash Narain Services
Janet Nguyen Ed Torres, Director of Operations &
Joe Shaw Maintenance
Teresa Smith Nick Kanetis, Director of Engineering
Troy Edgar, Board Chair Kelly Lore, Administrative Assistant
John Anderson, Board Vice Chair Rich Castillon, IT Systems & Operations
Manager
COMMITTEE MEMBERS ABSENT: Marc Dubois Contract& Purchasing
Manager
John Withers, Vice-Chair Cindi Ambrose, Contracts Supervisor
Jennifer Cabral
Norbert Gaia
Al Garcia
OTHERS PRESENT:
Brad Hogin, General Counsel
PUBLIC COMMENTS:
None.
REPORT OF COMMITTEE CHAIR:
Committee Chair Reese did not give a report.
REPORT OF DIRECTOR OF FINANCE AND ADMINISTRATIVE SERVICES:
Lorenzo Tyner briefly updated the Committee on the Bond refunding which was
completed last week.
General Manager Jim Herberg reported that an item will be brought to the Steering
Committee in the future regarding the backlog of repairs that are needed to OCSD
Administrative facilities.
CONSENT:
1. MOVED, SECONDED, AND DULY CARRIED: Approve Minutes of the
September 11, 2013 Administration Committee Meeting.
NON-CONSENT:
2. MOVED, SECONDED, AND DULY CARRIED: Recommend to the Board of
Directors to:
Approve the purchasing ordinance, Ordinance No. OCSD-XX entitled
"Establishing Requirements and Procedures for the Purchase of Goods,
Services, and Public Works Projects" for first reading at the October 2013 Board
meeting.
Lorenzo Tyner, Director of Finance & Administrative Services provided a short
presentation to the Committee regarding the background of the current
Purchasing Authority and the changes that are to be incorporated into the
proposed Ordinance.
3. MOVED, SECONDED, AND DULY CARRIED:
A. Waive the one year prohibition in OCSD Personnel Policy 1.4 for James
D. Ruth regarding retaining former employees as independent contractors
or consultants; and
B. Authorize the Board Chair to execute a Consulting Services Agreement
with James D. Ruth effective October 1, 2013 for an extension of services
relative to labor negotiations at an hourly rate of $200 per hour for a total
not to exceed amount of$48,000.
Directors Diep, Kim & Narain opposed.
Director of Human Resources Jeff Reed, made a brief presentation on the status
of Labor Negotiations, and the necessity of the proposed extended service
contract. He then responded to questions from the Committee regarding
alternative options. The Committee members expressed their support or
concerns.
10/09/13 Administration Committee Minutes Page 2 of 3
INFORMATION ONLY:
4. Information Technology Three-Year Strategic Plan FY 2013-2014.
Jim Herberg, presented the "Award of Excellence for Information Technology
Practices", received from Municipal Information Systems Association of California
(MISAC) and awarded to Orange County Sanitation District. He thanked Rich
Castillon, IT Systems and Operations Manager for his efforts.
Rich Castillon presented the Information Technology Three-Year Strategic Plan
and responded to questions from the Committee regarding; the risk of the OCSD
system, Homeland Security issues, staff skill levels and Business Continuity.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA
ITEMS, IF ANY:
None.
ADJOURNMENT:
Committee Chair Reese declared the meeting adjourned at 6:50 p.m.
Submitted by:
Kelly A. Lore
Administrative Assistant
10/09/13 Administration Committee Minutes Page 3 of 3
BOARD OF DIRECTORS Meeting Date I To Bd.of Dir.
1O/23/13
AGENDA REPORT ItemNumber Item Number
s
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Lorenzo Tyner, Director of Finance &Administrative Services
SUBJECT: PURCHASING ORDINANCE
GENERAL MANAGER'S RECOMMENDATION
A. Motion to read Ordinance No. OCSD-XX by title only and waive reading of said
entire Ordinance on October 23, 2013; and
B. Introduce Ordinance No. OCSD-XX, entitled "An Ordinance of the Board of
Directors of Orange County Sanitation District Establishing Requirements and
Procedures for the Purchase of Goods, Services, and Public Works Projects';
and
C. Set November 20, 2013, as the date of the second reading and proposed
adoption of Ordinance No. OCSD-XX.
D. Direct the Clerk of the Board to publish summaries of the Ordinance as required
by law.
SUMMARY
The proposed Purchasing Ordinance sets forth the requirements that apply to the
District's purchase of goods and services. These requirements are currently set forth in
Resolution No. OCSD 07-04, and subsequent amending Resolution No. OCSD 07-13
and Resolution No. OCSD 12-17. The proposed Ordinance updates and reorganizes
the requirements set forth in all three resolutions, clarifies a number of individual
requirements, and makes some substantive changes. The Ordinance, for example,
adds new procedures whereby an aggrieved bidder or proposer may protest the
solicitation process and/or the award of a contract.
Purpose. The Ordinance is designed to ensure that (1) the District complies with state
law requirements governing procurement; (2) the District obtains quality goods and
services at the lowest price and/or the best overall value; (3) purchasing decisions are
transparent for the public; and (4) the procurement process is fair to prospective
contractors while serving the interests of the District's ratepayers. The Ordinance also
delegates spending authority to the Standing Committees and the General Manager
within specified limits.
Competitive Selection in General. Depending on the nature of the procurement, the
Ordinance generally requires the District to select contractors based on either
Page 1 of 3
competitive bids or competitive proposals. Under a competitive bid process, the District
issues a notice inviting bids. Prospective contractors then submit sealed bids, and the
District awards the contract to the lowest responsive, responsible bidder. Under a
competitive proposal process, the District issues a request for proposals. Prospective
contractors then submit sealed proposals, and the District awards the contract to the
proposal that best meets the criteria specified in the request for proposals. The winning
proposal may or may not be the proposal that offered the lowest price.
Exceptions to Competitive Selection. In exceptional circumstances, the Ordinance
allows the District to select contractors without any competitive process. The Ordinance
allows the District, for example, to award a contract on a "sole source" basis when the
goods or services in question are unique or only available from one source. The
Ordinance also allows the District to award contracts without any competitive process
as may be necessary to respond to an emergency.
Types of Procurements. The Ordinance sets forth different requirements for four types
of procurements: (1) goods and services (other than professional services);
(2) professional services (other than professional design services); (3) professional
design services; and (4) public works construction. The Ordinance generally requires
the District to purchase goods and services, other than professional services, based on
the lowest price. In contrast, however, the Ordinance generally requires the District to
award professional service contracts to the most qualified firm, as long as the proposed
price is fair and reasonable. Finally, pursuant to State law, the Ordinance generally
requires the District to award contracts for public works construction to the lowest
responsive, responsible bidder.
Bid Protests. For the first time, the Ordinance requires procedures whereby a bidder or
proposer may challenge the District's solicitation process and/or the proposed award of
a contract. A bidder or proposer may challenge the solicitation process on the ground
that a free and open competition has not taken place, or cannot take place, and/or that
a particular specification or requirement is impractical, unduly restrictive, or ambiguous.
A bidder or proposer may also challenge the proposed award of a contract on the
grounds that a free and open competition has not taken place.
Delegation of Spending Authority. In the interest of efficiency, the Ordinance delegates
specified spending authority to the Standing Committees and the General Manager.
Standing Committees may approve purchases over $100,000 up to $200,000, plus a
contingency of up to 50%, for a total spending authority of up to $300,000. The General
Manager may approve purchases up to $100,000, and approve amendments and
change orders within established contingencies. These are the same limits set forth in
the current Resolution No. OCSD 07-04.
General Manager Policies and Procedures. Under the proposed Ordinance, the
General Manager will adopt detailed policies and procedures governing procurement in
order to implement the requirements of the Ordinance.
Page 2 of 3
PRIOR COMMITTEE/BOARD ACTIONS
October 2013 — Operations Committee and Administration Committee both approved
the purchasing ordinance, Ordinance No. OCSD-XX entitled "Establishing
Requirements and Procedures for the Purchase of Goods, Services, and Public Works
Projects'for first reading at the October 2013 Board meeting.
December 2012 - Board of Directors adopted Resolution No. OCSD 12-17, A
Resolution of the Board of Directors of the Orange County Sanitation District Amending
Section 4.09 Request for Proposal Procedure of Resolution No. OCSD 07-04 to Expand
the Request for Proposal Procedure to Include the Purchase of Critical, Routine, or
Recurring Goods or Services and to Define Best Value.
June 2007 — Board of Directors adopted Resolution No. OCSD 07-13, A Resolution of
the Board of Directors of the Orange County Sanitation District Establishing Policy for the
Payment of Mandatory and Statutory Fees Greater than the Limits Established in
Resolution No. OCSD 07-04 and Future Updates to the Delegation of Authority.
February 2007 — Board of Directors adopted Resolution No. OCSD 07-04 Establishing
Policies and Procedures for: The Award of Purchase Orders and Contracts; Public
Works Project Contracts; Professional Services Contracts; And Delegation of Authority
to Implement Said Policies and Procedures.
ADDITIONAL INFORMATION
Under Government Code Section 54202, the District must adopt policies and
procedures governing the purchase of supplies and equipment. Government Code
Section 4526 applies to the purchase of professional services from private architects,
landscape architects, engineers, environmental professionals, land surveyors, and
construction managers. Under Section 4526, the District must select the specified
professionals based on demonstrated competence and the professional qualifications
necessary for the satisfactory performance of the services required. Section 4526
allows the District to adopt by ordinance procedures ensuring that the specified services
are engaged on the basis of demonstrated competence and professional qualifications
at fair and reasonable prices. Under Public Contract Code Section 20783, the District
must award contracts for public works construction worth more than $35,000 to the
lowest responsive, responsible bidder. The Public Contract Code otherwise imposes a
variety of requirements on the award of public works construction contracts.
CEQA
Adoption of the Ordinance is not a "project' subject to CEQA because it constitutes
general policy and procedure making that will not result in any physical impact on the
environment. Public Resources Code Section 15378.
Page 3 of 3
BUDGET/DELEGATION OF AUTHORITY COMPLIANCE
N/A
ATTACHMENT The following attachment(s)are provided in hard copy and maybe viewed on-line at
the OCSD website(www.ocsd.com) with the complete agenda package:
DRAFT Ordinance No. OCSD-XX Establishing Requirements and Procedures for
the Purchase of Goods, Services, and Public Works Projects.
Page 4 of 3
Return to Aaenda Report
ORDINANCE NO. OCSD-XX
AN ORDINANCE OF THE BOARD OF DIRECTORS OF
ORANGE COUNTY SANITATION DISTRICT
ESTABLISHING REQUIREMENTS AND PROCEDURES
FOR THE PURCHASE OF GOODS, SERVICES, AND
PUBLIC WORKS PROJECTS
OCSD-XX-1
Contents
Article 1. General Provisions .......................................................................................4
Section 1.01. Purpose and Scope. ...................................................................... 4
Section1.02. Title................................................................................................4
Section 1.03. Definitions......................................................................................4
Section 1.04. Rules and Guidelines.....................................................................4
Section 1.05. Budgeted Funds ............................................................................5
Section 1.06. The Purchasing Manager ..............................................................5
Section 1.07. Exceptions to Competitive Selection..............................................5
Section 1.08. Evaluation Committees.................................................................. 6
Section 1.09. Severability.................................................................................... 6
Article 2. Goods and Services ..................................................................................... 6
Section 2.01. Purpose and Scope ....................................................................... 6
Section 2.02. Selection Process.......................................................................... 7
Section2.03. Exceptions..................................................................................... 7
Article 3. Professional Services...................................................................................9
Section 3.01. Purpose and Scope .......................................................................9
Section 3.02. Selection Process........................................................................ 10
Section 3.03. Exceptions................................................................................. 111
Article 4. Professional Design Services................................................................... 111
Section 4.01. Purpose and Scope ................................................................... 111
Section 4.02. Selection Process...................................................................... 111
Section4.03. Exceptions................................................................................. 155
Article 5. Public Works Projects.............................................................................. 155
Section 5.01. Purpose and Scope................................................................... 155
Section 5.02. Selection Process...................................................................... 166
Section 5.03. Exceptions................................................................................. 199
OCSD-XX-2
Return to Mende Report
Article6. Protests ......................................................................................................20
Section 6.01. Solicitation Protests .....................................................................20
Section 6.02. Award Protests ..........................................................................211
Section 6.03. Delay in Award...........................................................................211
Section 6.04. Remedies...................................................................................222
Section 6.05. Public Documents......................................................................222
Article 7. Delegation of Authority to Award Contracts..............................................233
Section 7.01. Award Authorization...................................................................233
Section 7.02. Task Orders...............................................................................244
Section 7.03. Time Extensions to Public Works Projects. ...............................244
Article8. Ethics........................................................................................................244
Section 8.01. Unlawful Consideration Prohibited.............................................244
Section 8.02. Conflicts of Interest. ...................................................................254
Article 9. Miscellaneous...........................................................................................255
Section 9.01. Noncompliance..........................................................................255
Section 9.02. Effective Date. ...........................................................................255
Section 9.03. Repeal of Resolutios No. OCSD 07-04......................................255
Section 10.01. Certification and Publication.............................................. 26
Appendix A Definitions................................................................................................ 337
OCSD-XX-3
NOW, THEREFORE, the Board of Directors of the Orange County Sanitation District
does hereby ORDAIN:
Article 1. General Provisions
Section 1.01. Purpose and Scope
A. Purpose. This Ordinance is intended to:
(1) Comply with certain provisions of state law requiring the District to adopt
written purchasing procedures;
(2) Ensure that the District complies with state law governing the award of
Contracts for Goods, Services, and Public Works Projects;
(3) Establish procedures to ensure that the District obtains quality goods
and competent services at the best price and/or the best value;
(4) Delegate certain spending authority to District employees in the interest
of efficient administration;
(5) Ensure that purchasing decisions are transparent for the public; and
(6) Ensure that Contracts are awarded through a process that is fair to
prospective Contractors and in the best interests of the District.
B. Scope.
This Ordinance governs the purchase of Goods, Services and the award of
Contracts for Public Works Projects.
Section 1.02. Title
This Ordinance may be referred to as the DistricPs "Purchasing Ordinance."
Section 1.03. Definitions
As used throughout this Ordinance, the terms set forth in Appendix A shall have
the meanings as defined therein, unless the context in which they are used clearly
requires a different meaning, or a different definition is prescribed for a particular Article
or provision.
Section 1.04. Rules and Guidelines
The General Manager shall implement the requirements of this Ordinance
through policies, rules, and guidelines governing the purchase of Goods and Services,
and the award of Contracts for Public Works Projects.
OCSD-XX-4
Return to Mende Report
Section 1.05. Budgeted Funds
No Contract for the purchase of Goods, Services, or Public Works Projects shall
be awarded unless and until the General Manager identifies funds in the current budget
that are allocated to the purchase.
Section 1.06. The Purchasing Manager
A. Duties. Consistent with the provisions of this Ordinance, the Purchasing
Manager shall:
(1) Procure, or supervise the procurement of, all Goods, Services, and
Public Works Projects purchased by the District; and
(2) Supervise and control inventories of supplies and materials.
B. Requests for Procurement. When a Department desires to procure Goods
and/or Services, the Department Director shall file a written Requisition, in
advance, with the Purchasing Manager. The Requisition shall describe the
Goods and/or Services to be acquired.
Section 1.07. Exceptions to Competitive Selection
Depending on the nature of the Contract and/or the circumstances, certain
provisions of this Ordinance require that Contracts for Goods and/or Services be
awarded based on Competitive Sealed Bids or Competitive Sealed Proposals. This
Section 1.07 establishes certain general exceptions to competitive selection
requirements for the procurement of Goods and Services. The exceptions set forth in
this Section 1.07 do not apply to the award of Contracts for the construction of Public
Works Projects.
A. Sole Source Procurement. Notwithstanding any other provision of this
Ordinance, a Contract for Goods and/or Services may be awarded based on
Sole Source Procurement, without soliciting bids or proposals as might
otherwise be required, if the General Manager or his designee determines in
writing that it is in the best interest of the District to award the Contract because
the Goods and/or Services are (i) of a unique nature based on their quality,
durability, availability, fitness or qualifications for a particular use; or (ii) only
available from one source.
B. Emergency Procurement. Notwithstanding any other provision of this
Ordinance, a Contract for Goods and/or Services may be awarded through
Negotiated Procurement, without soliciting bids or proposals as might otherwise
be required, if the General Manager or his designee determines in writing that
OCSD-XX-5
the District urgently needs the Goods and/or Services in order to respond
effectively to an emergency. For purposes of this Section, emergency
procurements are those purchases that are required to prevent immediate
interruption or cessation of necessary services or to safeguard life, property, or
the public health and welfare. In addition, emergency procurements as used in
this Section also include critical time sensitive purchases where time is of the
essence, and the District does not have sufficient time to solicit bids or
proposals. For emergency procurements greater than $100,000, the General
Manager shall obtain the concurrence of the Chair of the District's Board of
Directors or, if the Chair is unavailable, the Vice Chair, and such action shall be
ratified by the Board of Directors at its next regular meeting.
Section 1.08. Evaluation Committees
Evaluation committees convened in connection with procurements under this
Ordinance shall generally be composed of District employees. In exceptional
circumstances, however, the General Manager may appoint one or more
persons not employed by the District to an evaluation committee if the General
Manager determines that (1) evaluating proposals in connection with a
particular procurement requires specialized expertise not available among
District employees; (2) the procurement will impact another agency, and that
agency desires to place a representative on the evaluation committee; or (3) it
is otherwise in the District's interest to do so.
Section 1.09. Severability
If any provision of this Ordinance, or any application thereof to any person or
circumstance, is held invalid, such invalidity shall not affect any other provision
of this Ordinance or application to any person or circumstance which can be
given effect without the invalid provision or application. The provisions of this
Ordinance are declared to be severable.
Article 2. Goods and Services
Section 2.01. Purpose and Scope
A. Purpose. California Government Code Sections 54202 et seq. requires the
District to adopt written policies and procedures, including bidding
requirements, governing the purchase of Goods and Services. This Article is
intended to comply with Section 54202.
OCSD-XX-6
Return to Mende Report
B. Scope. The provisions of this Article 2 apply to Contracts for the purchase of
Goods and Services other than Contracts for Professional Services (governed
by Article 3), Professional Design Services (governed by Article 4), and
Contracts for Public Works Projects (governed by Article 5).
Section 2.02. Selection Process
A. Subject to the exceptions set forth in Section 2.03, the award of Contracts for
the purchase of Goods and Services shall be shall be based on Competitive
Sealed Bids. For each procurement, the Purchasing Manager shall:
(1) Publish a Notice Inviting Bids that contains (a) a description of the
Goods and/or Services required, (b) a description of the selection
process, (c) bidder's security requirement, if applicable, (d) performance
bond requirements, if applicable, and (a) such provisions, terms, and
conditions, consistent with this Ordinance, that the Purchasing Manager
determines are necessary, desirable, and/or advantageous to the
District;
(2) Open the bids publicly at the time and place designated in the Notice
Inviting Bids, and record the amount of each bid; and
(3) Determine whether the bids are responsive to the Notice Inviting Bids.
B. After the bids are opened, one of the following actions may be taken:
(1)Award the Contract to the lowest Responsive and Responsible Bidder;
(2) Reject any and all bids presented and/or re-advertise the bid; or
(3) Declare that the Goods and/or Services may be acquired at a lower cost
by negotiation in the open market and authorize the procurement in that
manner.
C. If two or more Responsible Bidders submit the same lowest bid, the District
may, in its discretion, accept either bid or a lower bid, if any, as may be
obtained from one of the bidders through negotiation.
Section 2.03. Exceptions
A. Small Procurements.
(1) Procurements of $5,000 or Less. Contracts subject to this Article 2 with
an estimated value of $5,000 or less may be awarded without
Competitive Sealed Bids if the Purchasing Manager determines that a
OCSD-XX-7
Competitive Sealed Bids process would not result in a lower overall cost
to the District.
(2) Procurements of$50,000 or Less. Contracts subject to this Article 2 with
an estimated value of $50,000 or less may be awarded by (a) soliciting
at least three bids from identified vendors, and (b) awarding the Contract
to the lowest Responsive and Responsible Bidder. If the Purchasing
Manager cannot obtain at least three bids, the Contract may be awarded
to the lowest Responsive and Responsible Bidder as long as the
Purchasing Manager determines that the bid amount is fair and
reasonable.
(3) Piecemealing Prohibited. Procurements shall not be artificially divided
into different individual Contracts so as to keep each Contract amount
below one of the monetary thresholds set forth in this Part A.
B. Cooperative Purchases. When another public agency or government
purchasing cooperative organization has awarded a Contract for Goods and/or
Services based on Competitive Sealed Bids or Competitive Sealed Proposals,
and the agency or organization followed a process substantially similar to the
process described in Section 2.02, the District may acquire Goods and/or
Services under that Contract without obtaining Competitive Sealed Bids or
Competitive Sealed Proposals. The District may enter into Contracts with other
public agencies, government purchasing cooperative organizations within the
United States, and/or Contractors for this purpose.
C. Multi-Step Sealed Bidding. If the Purchasing Manager determines that it is
impractical to initially prepare a description to support an award based on price,
a process involving multi-step sealed bids may be utilized. The multi-step
sealed bidding process involves (i) issuing an Invitation for Bids requesting the
submission of un-priced offers; and (ii) issuing a subsequent Invitation for Bids
for priced offers from those vendors whose initial un-priced offers were deemed
qualified under the criteria set forth in the initial Invitation for Bids. Award under
this process shall be based on the lowest Responsive and Responsible Bidder.
D. Competitive Sealed Proposals. If the Purchasing Manager determines in
writing that the Competitive Sealed Bids procedure is not practical and/or not
advantageous for the District in a particular case, one or more Contracts
subject to this Article may be awarded based on Competitive Sealed Proposals.
The Competitive Sealed Proposals process may be used (i) for Goods and/or
Services that prove difficult to quantify or describe, where proposers are
provided the opportunity to offer different approaches or solutions; and/or (ii)for
critical, routine or recurring goods or services that require consideration of the
OCSD-XX-S
Return to Mende Report
broadest possible range of competing services, products and materials
available, fitness of purpose, performance reliability, standardization, life cycle
costs, delivery timetables, reliable supply, support logistics, diversification of
available sources and/or other similar factors in addition to the price in the
award of these contracts. Award under this process shall be based upon
criteria that provide the best value for the District, wherein best value is not
solely determined by price.
E. Critical Time-Sensitive Procurements. The Purchasing Manager may purchase
Goods and/or Services through Negotiated Procurement if the Purchasing
Manager determines in writing that time is of the essence in the purchase of the
Goods and/or Services. For critical time-sensitive procurements valued at
more than $100,000, the General Manager shall obtain the concurrence of the
Chair of the District's Board of Directors or, if the Chair is unavailable, the Vice
Chair.
F. Renewals. The Purchasing Manager may exercise any options to renew as
may be included in existing Contracts without observing the bidding procedures
prescribed in Section 2.02.
G. Sole Source and Emergency Procurements. A Contract for the purchase of
Goods and/or Services may be awarded without soliciting competitive bids if
any of the exceptions set forth in Section 1.07 apply.
Article 3. Professional Services
Section 3.01. Purpose and Scope
A. Purpose. This Article 3 is intended to ensure that the District retains
Professional Services at fair and reasonable prices based on demonstrated
competence and the professional qualifications necessary for the satisfactory
performance of the services required.
B. Scope. The provisions of this Article 3 apply to the award of Contracts for
Professional Services and incidental services that members of a Professional
Service firm, and those in their employ, may logically perform. The provisions
of this Article 3 do not apply to the award of Contracts for Professional Design
Services (governed by Article 4).
OCSD-XX-9
Section 3.02. Selection Process
Contracts for Professional Services shall be awarded pursuant to the following
procedures:
A. Reauest for Proposals. The Purchasing Manager shall prepare a Request for
Proposals in consultation with the Director of the Department requesting the
Procurement. The Purchasing Manager, with the concurrence of the Director of
the Department requesting the Procurement, may select a limited number of
Professional Service firms to receive the Request for Proposals. The
Purchasing Manager may issue a Request for Qualifications to prospective
Contractors as a means of identifying prospective recipients. The Purchasing
Manager may publish notice of the Request for Proposals or Request for
Qualifications.
B. Evaluation and Ranking of Proposals. All responsive proposals shall be
evaluated and ranked, from most qualified to least qualified, based on each
firm's demonstrated competence and professional qualifications necessary for
the satisfactory performance of the services required. The Purchasing Manager
may establish a committee to conduct the evaluation. The Purchasing
Manager or evaluation committee, if any, may discuss each proposal with its
author to seek clarification or otherwise obtain relevant information.
C. Negotiation of Contract. The Purchasing Manager shall negotiate a Contract
with the firm deemed to be most qualified at a price that the Purchasing
Manager, with the concurrence of the Director of the Department requesting the
Procurement, deems to be fair and reasonable. If the Purchasing Manager is
unable to negotiate a satisfactory Contract with the firm deemed to be most
qualified, the Purchasing Manager shall terminate negotiations with that firm
and negotiate with the firm deemed to be second most qualified. If those
negotiations fail, the Purchasing Manager shall negotiate with the third most
qualified firm, and so on, until an agreement is reached. If the Purchasing
Manager determines that it is in the best interest of the District to enter into
Contracts with two or more firms, the Purchasing Manager shall negotiate with
the desired number of firms starting with the most qualified. The Purchasing
Manager shall proceed down the list from most to least qualified until he or she
has concluded negotiations with the desired number of firms at fair and
reasonable prices.
D. The District may, in its sole discretion, reject all proposals.
OCSD-XX-10
Return to Mende Report
Section 3.03. Exceptions
A. Sole Source and Emergency Procurements. A Contract for Professional
Services may be awarded without soliciting Competitive Sealed Proposals if the
Purchasing Manager makes one of the determinations set forth in Section 1.07.
B. Contractors Reporting to the Board. The provisions of this Article 3 shall not
apply to the retention of Professional Service firms or individuals that are
selected by the Board and report directly to the Board. For such Contracts, the
Board shall determine the method of selection, consistent with the requirements
of applicable law.
Article 4. Professional Design Services
Section 4.01. Purpose and Scope
A. Purpose. This Article 4 is intended to ensure that the District retains
Professional Design Services at fair and reasonable prices based on
demonstrated competence and the professional qualifications necessary for the
satisfactory performance of the services required.
B. Scope. This Article 4 applies to the selection of Contractors for Professional
Design Services.
Section 4.02. Selection Process
A. Competitive Selection.
All Contracts estimated to be greater than $100,000 shall be awarded based on
Competitive Sealed Proposals. All Professional Design Services with an
estimated value of $100,000 or less shall have a separate selection process
based upon a master contract procedure whereby the District shall solicit
Competitive Sealed Proposals and award one or more master contracts not to
exceed $250,000 per year.
B. Contracts Greater Than $100,000
The requirements set forth in this Section 4.02, subsection B, shall apply to the
purchase of Professional Design Services estimated to cost more than
$100,000.
(1) Each Director of a Department that utilizes Professional Design Services
shall file annually with the Purchasing Manager a list of specific
OCSD-XX-11
disciplines for which Professional Design Service may be required. The
Purchasing Manager may from time to time prepare and distribute a
Request for Qualifications for each professional discipline or project
design service required by the District subject to this Part B. For each
Request for Qualifications issued, the Purchasing Manager shall
evaluate the responses, identify qualified firms, and maintain the
responses of the qualified firms on file to be used in the Request for
Proposals process described below.
(2) Reguest for Proposals. The Purchasing Manager, in consultation with
the Director of Engineering, shall issue a Request for Proposals for each
Professional Design Service requested.
(3) Content of Request for Proposals. Each Request for Proposals shall
describe the Professional Design Services required and the selection
process. Each Request for Proposals shall also set forth such
provisions, terms, and conditions, consistent with this Ordinance, that
the Purchasing Manager, in consultation with the Director of
Engineering, determines are necessary, desirable, and/or advantageous
to the District. Each Request for Proposals shall require that proposals
contain, at a minimum, the following information:
(a)The firm's qualifications for performing the proposed work.
(b)The firm's relevant experience and performance on similar projects.
(c) A fee proposal, based on the method of compensation specified in the
Request for Proposal, and an estimate of total fees. Commonly used
methods of compensation for Professional Design Service Contracts
include (i) cost plus fixed fee with a maximum amount; (ii) per diem
rate(s) with a maximum amount; (iii) a lump sum (fixed) fee; and (iv)
cost of time and materials.
(d)The firm's ability to complete the work within the time allotted.
(a)The personnel that will be assigned to the project.
(f) The estimated number of hours that each member of the team will
spend on the project.
(g) A statement that the firm's engagement for the project would not create
a conflict of interest.
(h)Any other information required to properly evaluate the firm's
qualifications and experience with similar projects.
OCSD-XX-12
Return to Mende Report
(i) Proposals for construction management services shall demonstrate
that the designated personnel have expertise and experience in
construction project design review and evaluation, construction
mobilization and supervision, bid evaluation, project scheduling, cost-
benefit analysis, claims review and negotiation, and general
management and administration of a construction project.
(4) Publication of Request for Proposals. The District shall publicize each
Request for Proposals by two or more of the following methods:
(a)Advertising in print or electronic media; and/or
(b) Mailing the Request for Proposals to each Contractor who has
submitted a Statement of Qualifications; and/or
(c) Mailing the Request for Proposals to each vendor registered in the
applicable category, based on the services identified in the Request for
Proposals, in the District's on-line vendor database; and/or
Multiple projects may be bundled into one Request for Proposals such that
multiple Contract awards may result from one Request for Proposals and
selection may be based upon specialized services.
(5) Staff Evaluation Committee. The Purchasing Manager shall convene an
evaluation committee to evaluate the proposals.
(a) Management and Composition. The Purchasing Manager shall serve
as chair of the evaluation committee. The Director of Engineering shall
appoint the other members of the committee.
(b) Ranking of Firms. All proposals shall be evaluated and ranked, from
most qualified to least qualified, based on each firm's demonstrated
competence and professional qualifications necessary for the
satisfactory performance of the services required.
(c) Interviews. At its discretion, the evaluation committee may interview
one or more of the firms that have submitted proposals.
(d) Report. The evaluation committee shall prepare a written report for the
Purchasing Manager and the Director of Engineering setting forth, at a
minimum, the ranking of firms from most qualified to least qualified.
(6) Negotiations. The Purchasing Manager and the Director of Engineering
shall negotiate a Contract with the firm that the evaluation committee
deems to be most qualified, and otherwise follow the process set forth in
Section 3.02.C. The Director of Engineering shall make a written
determination that the negotiated fee is fair and reasonable.
OCSD-XX-13
C. Contracts Less Than or Equal to $100,000.
The requirements set forth in this Section 4.02, subsection C, shall apply to the
purchase of Professional Design Services estimated to cost less than or equal
to $100,000 for each individual project.
(1) Reguest for Qualifications. At least once every three years, the
Purchasing Manager shall prepare and distribute a Request for
Qualifications for each professional discipline or project design service
required by the District subject to this Part C. Each Request for
Qualifications shall describe the selection criteria that will be used to
determine whether firms are eligible for the prequalified list. The
Request for Qualifications shall require the following information, at a
minimum, from proposers:
(a)The firm's demonstrated competence and specialized expertise
necessary to perform the type of services needed;
(b)The education, experience, training, and skills of the key personnel
that will perform and manage the work for the District;
(c) The firm's capacity and resources to deliver the services required
within the specified period of time, including but not limited to a
sufficient number of qualified staff, computer hardware, computer
software, special equipment and facilities as applicable; and
(d)The proximity of the firm's office(s) to the District, the specific location
of key personnel, and the firm's experience and familiarity with the
operation of local government.
(2) Evaluation Committee. The Purchasing Manager shall convene an
evaluation committee to evaluate the responses to each Request for
Qualifications. The Purchasing Manager shall chair the committee, and
the Director of Engineering shall appoint the remaining members. Each
evaluation committee shall determine whether each firm has the
demonstrated competence and professional qualifications necessary for
the satisfactory performance of the services required.
(3) Lists. Based on the recommendations of the evaluation committee, with
the concurrence of the Director of Engineering, the Purchasing Manager
shall establish a list of at least five prequalified Contractors within each
discipline. Each list shall be used for a maximum of three years. No
later than three years after establishing a prequalified list for each
discipline, the Purchasing Manager shall issue a new Request for
Qualifications and establish a new list.
OCSD-XX-14
Return to Mende Report
(4) Master Contract. Master Contracts with firms on the prequalified list
shall be awarded by the Board of Directors in an amount not to exceed
$250,000 per year. The original term of such Contracts shall be for one
(1) year, with an option to extend each Contract for up to two (2)
additional one (1) year renewal periods.
(5) Task Orders. The Director of Engineering shall notify the Purchasing
Manager when Professional Design Services subject to this Part C are
required for a project. Proposals shall be solicited from at least two firms
on the prequalified list and one of the firms shall be selected pursuant to
the process set forth in Section 3.02. In determining which firms will be
invited to submit proposals, the Purchasing Manager shall follow the
selection or rotation process, if any, set forth in the Request for
Qualifications, subject to the best interests of the District in any particular
case. Individual Task Orders in an amount not to exceed $100,000 will
be awarded for each project.
Section 4.03. Exceptions
A. Sole Source and Emergency Procurements. Contracts for Professional Design
Services may be awarded without soliciting Competitive Sealed Proposals if the
Purchasing Manager makes one of the determinations set forth in Section 1.07.
B. Continuation of Services. A new contract for additional services related to work
already performed under an existing Contract for Professional Design Services
may be awarded without observing the bidding procedures prescribed in
Section 4.02.13 or Section 4.02.C, as applicable. In connection with any such
new contract, the Director of Engineering shall determine in writing that (1) it is
in the District's best interests to have the original firm perform additional,
related services, and (2) the negotiated price is fair and reasonable.
Article 5. Public Works Projects
Section 5.01. Purpose and Scope
A. Purpose. This Article 5 is intended to implement state statutes that govern the
District's award of construction Contracts for Public Works Projects.
B. Scope. This Article 5 applies to the District's award of Contracts for the
construction of Public Works Projects exceeding thirty-five thousand dollars
($35,000) pursuant to Public Contract Code section 20783.
OCSD-XX-15
Section 5.02. Selection Process
A. Design-Bid-Build
(1) Competitive Sealed Bids. For projects subject to Public Contracts Code
section 20783, the District shall select firms for Public Works Projects
pursuant to the process described in this Section 5.02A.
(a) Notice Inviting Bids. For each prospective Contract, the Purchasing
Manager shall publish a Notice Inviting Bids as required by Public
Contract Code Section 20783.
(i) Manner of Publication. Each Notice Inviting Bids shall be
published in a newspaper of general circulation, on industry
bulletin boards, and/or on the District's website at least ten (10)
days before the date for the opening of bids consistent with the
requirements set forth in Public Contracts Code section 20783.
(ii) Contents. Each Notice Inviting Bids shall:
1. Establish a deadline for the receipt of bids that is at least ten
(10) calendar days after the first publication of the Notice
Inviting Bids;
2. Provide that the District, in its sole discretion, may reject any
and all bids;
3. Set forth a procedure that shall be followed in the event of a
tie between the lowest Responsive and Responsible bidders;
4. Require bidders to post a bidder's security;
5. State that if a Contract is awarded to the bidder, a payment
bond is required pursuant to Civil Code section 9550;
6. Contain detailed plans and specifications for the project.
Subject to the exceptions set forth in Section 5.03.6, the
specifications shall not call for a designated material,
product, thing, or service by specific brand or trade name
unless the District complies with the requirements under
California Public Contract Code section 3400 at seq.; and
OCSD-XX-16
Return to Mende Report
7. Contain whatever provisions, consistent with this Ordinance,
the Purchasing Manager determines are necessary,
desirable, and/or advantageous to the District.
(b) Bid Opening. The Purchasing Manager shall open the bids publicly in
the presence of one or more witnesses at the time and place
designated in the Notice Inviting Bids. The Purchasing Manager shall
record the amount of each bid together with the name of each bidder.
This record, and each bid, shall be considered public records and shall
be available to the public at the point in time specified in the Notice
Inviting Bids and consistent with the Public Records Act.
(c) Refection of Bids. The District may reject all bids received for a
particular project and:
(1) Re-advertise for bids; or
(ii) Authorize construction of the project through a Negotiated
Procurement of day labor and/or materials or supplies, if the Board
adopts a resolution by a four-fifths vote declaring that (i) the work
can be performed more economically by day labor, and/or (ii) the
materials or supplies can be obtained at a lower price in the open
market.
(d) No Bids. If the District does not receive any bids for a particular
project, the District's Board of Directors may authorize the Purchasing
Manager to conduct a Negotiated Procurement, and present his or her
recommendation to the Board for approval.
(a)Award to Lowest Responsive and Responsible Bidder. Unless the
District rejects all bids, the Contract shall be awarded to the lowest
Responsive and Responsible Bidder. If two or more Responsible
Bidders submit the same lowest bid, the District may, in its discretion,
accept either bid or a lower bid, if any, as may be obtained from one of
the lowest bidders through negotiation. If the lowest Responsive and
Responsible Bidder refuses to enter into a Contract, then the lowest
Responsive and Responsible Bidder shall forfeit its bidder's security,
and the Contract shall be awarded to the next lowest Responsive and
Responsible Bidder.
B. Design-Build. As may be authorized by the Public Contract Code or other
statute, the District may utilize a design-build selection process for the award of
Public Works Contracts.
OCSD-XX-17
C. Pregualification. The Purchasing Manager may limit the field of prospective
bidders for Public Works Contracts by prequalifying Contractors pursuant to
California Public Contract Code Section 20101 and the requirements of this
Subsection C.
Prequalification shall only be required when the Purchasing Manager or the
Director of Engineering determines that prequalification is necessary or
desirable. The Purchasing Manager may (i) prequalify a list of Contractors for
the right to bid on any specific Public Works Project, and/or (ii) prequalify lists of
Contractors for the right to bid on unspecified projects of a certain type or size
pursuant to Public Contracts Code Section 20101(c). If the Purchasing
Manager elects to prequalify lists of Contractors for the right to bid on
unspecified projects of a certain type or size, he or she shall conduct a
prequalification process quarterly, and all qualifications shall be valid for one
year. For each prequalified list of either type, the Purchasing Manager shall
evaluate and prequalify Contractors pursuant to the following procedures:
(1) Questionnaires and Rating Criteria. The Purchasing Manager shall
develop a questionnaire and rating criteria for each prequalification. All
criteria shall be relevant and objective. The Purchasing Manager may
rely on the Department of Industrial Relations model guidelines,
questionnaires, and forms, and/or establish additional or modified
criteria.
(2) Statements of Qualifications. The Purchasing Manager shall solicit
Statements of Qualifications from prospective bidders.
(3) Evaluation Committee. The Purchasing Manager shall convene an
evaluation committee to evaluate each Statement of Qualifications. The
Purchasing Manager shall chair the committee, and the Director of
Engineering shall appoint the remaining committee members. The
evaluation committee shall review each Statement of Qualifications, rate
the Contractors according to their qualifications and objective criteria,
and determine which Contractors are qualified and which Contractors
are not qualified.
(4) Notice of Determination. When the evaluation committee completes its
review, the Purchasing Manager shall send each Contractor written
notice of the committee's determinations regarding that Contractor. If
the evaluation committee determines that a Contractor is not qualified,
the written notice shall also set forth the basis for that determination and
any relevant supporting evidence that the evaluation committee
considered.
OCSD-XX-18
Return to Mende Report
(5)Appeal Process.
(a) Notice of Appeal. Any Contractor may appeal to the General Manager
any determination of the evaluation committee, including any rating
assigned to the Contractor and any decision to disqualify the
Contractor, by filing a written notice of appeal within seven (7) working
days after the Purchasing Manager mails the notice described in
Section 5.02, subsection C (4).
(b) Hearing. Within five working days of the receipt of an appeal, the
General Manager, or a designee of the General Manager who has not
been involved in the evaluation of qualifications of Contractors for the
project, shall conduct a hearing on the appeal. During the hearing, the
affected Contractor or subcontractor shall have the opportunity to rebut
any evidence used as a basis for disqualification and to present
evidence to the General Manager or the General Manager's designee
as to why the prospective bidder should be found qualified.
(c) Decision. Within five working days of the conclusion of the hearing,
the General Manager or the General Manager's designee shall issue a
written decision on the appeal. The decision of the General Manager
or the General Manager's designee shall be final.
Section 5.03. Exceptions
A. Emergencies and Calamities.
(1) The provisions of this Section A apply in the event of an emergency or
calamity involving a sudden, unexpected occurrence that poses a clear
and imminent danger requiring immediate action to prevent or mitigate
the loss or impairment of life, health, property, or essential public
services. In the event of such an emergency or calamity, the District
may, through Negotiated Procurement, award Contracts to repair or
replace facilities, take any directly related and immediate action required
by the emergency or calamity, and procure the necessary equipment,
services, and supplies for those purposes.
(2) The General Manager may take the actions described in (1), with the
concurrence of the Chair of the Board of Directors and/or the Vice Chair,
without obtaining prior approval of the District's Board of Directors. In
taking any such action, the General Manager shall follow the procedures
set forth in Public Contracts Code Section 22050.
(3) In the alternative, the District's Board of Directors may, by resolution
adopted by a four-fifths vote, take the actions described in Subsection
OCSD-XX-19
(1). In taking any such action, the District shall follow the procedures set
forth in Public Contracts Code 22050.
B. Specification of Brand or Trade Name. Notwithstanding Section
5.02.A(1)(a)(ii)6, the specifications for a Public Works Contract may call for a
designated material, product, thing, or service by specific brand or trade name
without inserting the words "or equal" if the District complies with the
requirements of the California Public Contract Code section 3400 et seq. The
General Manager is authorized to make the findings required under California
Public Contract Code section 3400 et seq. The Notice Inviting Bids or Request
for Proposals shall state that a particular material, product, thing, or service is
necessary or desirable for any of the following purposes:
(1) In order that a field test or experiment may be made to determine the
product's suitability for future use;
(2) In order to match other products in use on a particular public
improvement either completed or in the course of completion;
(3) In order to obtain a necessary item that is only available from one
source;
(4) In order to respond to an emergency declared by the District, but only if
the declaration is approved by a four-fifths vote of the District's Board of
Directors; or
(5) In order to respond to an emergency declared by the state, a state
agency, or political subdivision of the state, but only if the facts setting
forth the reasons for the finding of the emergency are contained in the
public records of the District.
Article 6. Protests
The District shall afford Interested Parties an opportunity to protest the solicitation of
bids and proposals and the award of contracts as set forth in this Article 6. The General
Manager shall adopt detailed protest procedures consistent with this Article 6. The
protest procedures governing any particular procurement shall be set forth in the Notice
Inviting Bids or the Request for Proposals, as applicable.
Section 6.01. Solicitation Protests
A. Interested Parties may file a Solicitation Protest Statement with the Purchasing
Manager on the grounds that a free and open competition has not taken place,
or cannot take place, and/or that a particular specification or requirement is
impractical, unduly restrictive, or ambiguous. Each Notice Inviting Bids and
OCSD-XX-20
Return to Agenda Report
Request for Proposals shall identify the date and time that the Solicitation
Protest Statement is due, the information required to be included in the
Solicitation Protest Statement, the evaluation process, and the types of
remedies available.
B. The Purchasing Manager shall evaluate each Solicitation Protest Statement
and determine what actions, if any, will be taken to remedy any deficiency. The
decision of the Purchasing Manager shall be final.
Section 6.02. Award Protests
A. In connection with any competitive selection process, any Interested Party may
file an Award Protest Statement with the Purchasing Manager on the ground
that a free and open competition has not taken place in connection with the
award recommendation. The Purchasing Manager shall not, however, consider
any protest based on a finding that a bid or proposal is not responsive.
B. Each Notice Inviting Bids and Request for Proposals shall identify the deadline
for Award Protest Statements and describe the information required to be
included in any Award Protest Statement, the evaluation process, the appeal
process, and the types of remedies available.
C. The Purchasing Manager shall evaluate each Award Protest Statement and
determine what actions, if any, will be taken to remedy any deficiency.
D. The Purchasing Manager's decision on an Award Protest Statement may be
appealed to the Director of Finance and Administrative Services and the
Director of the Department requesting the Goods or Services. The Director of
Finance and Administrative Services and the Director of the Department
requesting the Goods or Services shall evaluate each Award Protest Statement
and determine whether to uphold or reject the Purchasing Manager's
determination. For Contracts to be awarded by District staff, the decision of the
Director of Finance and the Director of the Department requesting the Goods or
Services shall be final. For Contracts to be awarded by the Board of Directors,
the Board may consider any Award Protest Statements in connection with its
consideration of the Contract.
Section 6.03. Delay in Award
A. Execution of any proposed contract shall be delayed pending resolution of any
protests unless one or more of the following conditions is present:
(1) The items or services being procured are urgently required;
OCSD-XX-21
(2) Delivery or performance will be unduly delayed by failure to make an
award promptly; or
(3) Failure to make prompt award will otherwise cause undue harm to the
District.
Section 6.04. Remedies
A. If the final decision maker determines that the award or proposed award was
not made in accordance with applicable statutes, regulations, policies and/or
procedure, the District, in its sole discretion, may grant any of the following
remedies or any other remedy it deems appropriate:
(1) Prior to award, the District may issue a new solicitation, make a new
selection/award recommendation, or award a contract consistent with
applicable statutes, regulations, policies and procedures;
(2) Take no further action; or
(3) Take any other action that is permitted by law to promote compliance
with applicable statutes, regulations, policies and/or procedure.
B. In determining the appropriate remedy, if any, the District shall consider all the
circumstances surrounding the Notice Inviting Bids or Requests for Proposal
and/or award, including, but not limited to:
(1) The seriousness of any deficiency found to exist in the contracting
process;
(2) The effect of the action on the competitive process;
(3)Any urgency surrounding the contract requirement; and
(4) The effect that implementing the remedy will have on the District.
C. Nothing contained herein shall be construed to act as a limitation on the
Districts choice of remedies or confer any right upon any Interested Party or
affected party to a remedy.
Section 6.05. Public Documents
Solicitation Protest Statements and Award Protest Statements are public
documents. The District will notify the affected parties when a protest has been
submitted, and will provide copies of the Protest Statements to the affected
parties upon written request.
OCSD-XX-22
Return to Mende Report
Article 7. Delegation of Authority to Award Contracts
This Article 7 applies to all Contracts for Goods, Services, and Public Works
Projects entered into by the District.
Section 7.01. Award Authorization
A. Delegation by General Manager.
The General Manager shall establish written procedures governing the
delegation of authority to award and execute Contracts consistent with this Ordinance.
Upon delegation of authority by the General Manager, each Department Head may
further delegate authority to initiate a written Requisition consistent with the General
Manager's written procedures.
B. Original Contracts and Contingencies.
The Board of Directors hereby delegates the authority to award Contracts within
specified limits as follows:
Delegated Authority Authorized Action
General Manager/ Authorization to approve and execute Contracts for
Assistant General budgeted procurements up to $100,000, including any
Manager contingency. All procurements over $50,000 are to be
reported to the Board of Directors on a quarterly basis.
Standing Committees Authorization to approve procurements over $100,000
up to $200,000, plus a contingency of up to 50%, for a
total spending authority of up to $300,000 for each
Contract.
All original Contracts for procurements that exceed these limits shall be approved by the
Board of Directors.
C. Amendments and Change Orders.
The Board of Directors hereby delegates the authority to approve of
Amendments and Change Orders in any amount as follows:
Delegated Authority Authorized Action
General Manager/ Authorization to approve and execute Amendments
Assistant General and Change Orders as long as (1) the Amendment or
Manager Change Order is recommended by the applicable
Department Director, and (2)the Amendment or
OCSD-XX-23
Change Order amount is within the original-approved
contingency.
Authorization to approve and execute Amendments to
chemical Contracts, unless the Contract unit price has
been changed from the original amount approved by
the District's Board of Directors. Unit price increases in
chemical Contracts require Board of Directors approval.
Section 7.02. Task Orders
The Board of Directors hereby delegates the authority to award Task Orders within
specified limits as follows:
Delegated Authority Authorized Action
General Manager/ Authorization to approve, upon the recommendation of
Assistant General the Department Director, and execute Task Orders
Manager and/or Amendments to the Task Orders provided the
cumulative total of the Task Order and Amendments
thereto do not exceed $100,000.
Standing Committees Authorization to approve, upon the recommendation of
the General Manager/Assistant General Manager, Task
Orders and/or Amendments to the Task Orders
provided the cumulative total of the Task Order and
Amendments do not exceed $200,000
All Task Orders that exceed these limits shall be approved by the Board of Directors.
Section 7.03. Time Extensions to Public Works Projects
The General Manager may approve and execute Change Orders for Public
Works Project Contract time extensions that do not involve any increase in
compensation over the approved Contingency.
Article 8. Ethics
Section 8.01. Unlawful Consideration Prohibited
District Officials shall neither solicit nor receive bribes, rebates, kickbacks, and/or
any other unlawful consideration from any contracting party, or any party seeking a
Contract with the District, in exchange for favorable treatment or any other action.
OCSD-XX-24
Return to Mende Report
Section 8.02. Conflicts of Interest
A. Compliance with the Political Reform Act. District Officials shall not make any
Contracts, participate in the making of any Contracts, or in any way attempt to
use their official positions to influence any decision on any Contracts, in
violation of Government Code Sections 87100 et seq.
B. Compliance with Government Code S 1090. Without limiting the requirements
of Part A above, no District Official shall make any Contract, participate in the
making of any Contract, or in any way attempt to use his or her official position
to influence any decision on a Contract, in violation of California Government
Code Section 1090.
C. Requirements Applicable to Consultants. Consultants designated by the
District's Conflict of Interest Code shall comply in all respects with Government
Code Section 87100 at seq., and its implementing regulations.
Article 9. Miscellaneous
Section 9.01. Noncompliance
Any Contract entered into which fails in any respect to comply with the provisions
of this Ordinance may be voided by the Board of Directors in its sole and absolute
discretion. Any employee who willfully and knowingly violates any provision of this
Ordinance may be subject to disciplinary action.
Section 9.02. Effective Date
This Ordinance No. OCSD XX-XX shall take effect January 1, 2014, upon
adoption by the Board of Directors.
Section 9.03. Repeal of Resolution No. OCSD 07-04, OCSD 07-13 & OCSD
12-17
Resolution No. OCSD 07-04, entitled "A Resolution of the Board of
Directors of the Orange County Sanitation Establishing policies and
procedures for: The award of purchase orders and contracts; public
works project contracts; professional services contracts; and
delegation of authority to implement said policies and procedures" is
hereby repealed in its entirety.
Resolution No. OCSD 07-13, entitled "A Resolution of the Board of
Directors of the Orange County Sanitation District Establishing Policy
OCSD-XX-25
for the payment of mandatory and statutory fees greater than the
limits established in Resolution No. OCSD 07-04 and future updates
to the Delegation of Authority' is hereby repealed in its entirety.
Resolution No. OCSD 12-17, entitled "A Resolution of the Board of
Directors of the Orange County Sanitation District amending Section
4.09 request for proposal procedure of Resolution No. OCSD 07-04
to expand the request for proposal procedure to include the purchase
of critical, routine, or recurring goods or services and to define best
value" is hereby repealed in its entirety.
Section 10.01. Certification and Publication. The Clerk of the Board shall certify to
the adoption of this Ordinance, and shall cause a summary to be published in a
newspaper of general circulation within 15 days as required by law.
OCSD-XX-26
Return to Mende Report
Appendix
Definitions
A. Amendment means a properly executed written agreement entered into
and between the District and the Contractor, or issued by the District,
covering modifications to the original Contract and which may result in
adjustments to provisions of the Contract, including, but not limited to,
terms, scope of work, compensation, and/or period of performance.
B. Award Protest Statement shall mean a written objection to the award
recommendation prior to final action to award the contract, which shall be
submitted after receipt of bids, but before award of a contract, as specified
herein.
C. Best value means the overall combination of quality, price, and other
elements of a proposal/bid (or combination of several proposals/bids) that,
when considered together, provide the greatest overall benefit in response
to the requirements described in the solicitation documents.
D. Change Order means a properly executed written agreement entered into
and between the District and the Contractor, or unilaterally issued by the
District, covering modifications to the original Contract, and which may
result in adjustments to the provisions of the Contract, including, but not
limited to, terms, scope of work, cost and/or period of performance.
E. Competitive Sealed Bids means a selection process whereby prospective
Contractors submit sealed bids and the Contract is awarded to the lowest
Responsive and Responsible Bidder.
F. Competitive Sealed Proposals means a selection process whereby
prospective Contractors submit sealed proposals and the Contract is
awarded to the proposal that best meets the criteria specified in the
Request for Proposals.
G. Contingency means an amount above the original Contract price, as
awarded by the delegated authority, established at the time of Contract
award, as may be amended thereafter, to be used for Contract changes.
H. Contract means any type of agreement for the purchase of Goods,
Services, and/or Public Works Projects. Contracts may be labeled in
various different ways, including, but not limited to, 'contract,"
"agreement," "purchase order," and "task order."
OCSD-XX-27
I. Contractor means any person or entity that has a Contract with the
District.
J. Department means one of the District's designated departments.
K. Design-Bid-Build means a selection process for the award of Public
Works Contracts involving three basic steps: (1) the District hires a design
professional to prepare detailed plans and specifications or the District
prepares detailed plans and specifications; (2) the District solicits bids
from construction firms based on the detailed plans and specifications;
and (3) the District awards the Contract to the lowest Responsive and
Responsible Bidder.
L. Design-Build means a selection process for the award of Public Works
Contracts involving two basic steps: (1) the agency solicits proposals from
pre-qualified firms to design and construct a project; and (2) depending on
the award criteria set forth in the Request for Proposals, the agency
awards the Contract to either (a) the lowest Responsive and Responsible
Bidder, or(b) the proposal that presents the "best value"
M. Director means a director of one of the District's designated departments,
or his or her designee(s).
N. Director of Engineering means the District's Director of Engineering or his
or her designee(s).
O. District means the Orange County Sanitation District.
P. District Board or Board means the Board of Directors of the Orange
County Sanitation District.
Q. District Official means any member of the District's Board of Directors, any
District employee, and any District consultant that is designated under the
District's Conflict of Interest Code.
R. General Manager means the General Manager of the District, or his or her
designee(s).
S. Goods means fixed, movable, disposable, and/or reusable products,
commodities, equipment, materials, supplies or items used by the District,
and excludes land or any interest in real property.
OCSD-XX-28
Return to Mende Report
T. Interested Pa rtv shall mean all bidders or proposers, and prospective
bidders or proposers, on procurement.
U. Mailing means transmission by United States Postal Service, electronic
mail, or facsimile.
V. Negotiated Procurement means a selection process whereby the
Purchasing Manager identifies one or more prospective Contractors of his
or her choice, negotiates with one or more of them, and awards the
Contract to one of them based on the best interest of the District.
W. Notice Inviting Bids/Invitation for Bids means all documents, whether
attached or incorporated by reference, utilized for soliciting bids.
X. Procurement means buying, purchasing, renting, leasing, or otherwise
acquiring any goods, services, construction, construction services, or
professional services. It also includes all functions that pertain to the
obtaining of any goods, services, or construction, including description of
requirements, election and solicitation of sources, preparation and award
of contract, and all phases of contract administration.
Y. Professional Services means (i) services provided by professionals that
involve specialized judgment, skill, and expertise, and (ii) incidental
services that professionals, and those in their employ, may logically or
justifiably perform. Professional Services include, but are not limited to,
services provided by engineering, architectural, environmental, land
surveying, construction management, accounting, financial, information
technology, human resources consultation and advocacy, legislative
advocacy, and scientific research/consulting firms.
Z. Professional Design Services means engineering, architectural,
environmental, land surveying, construction management, and similar
Professional Services retained by the District in connection with, but not
limited to, construction, alteration, and/or repair projects.
AA. Public Works/Public Works Project means a project involving the
construction, erection, or alteration of any type of structure, building, or
improvement other than sewerage maintenance or repair projects.
BB. Purchasing Manager means the Districfs Contracts, Purchasing and
Materials Management Manager, or his or her designee(s).
OCSD-XX-29
CC. Reguest for Proposals means all documents, whether attached or
incorporated by reference, utilized for soliciting proposals.
DD. Reguest for Qualifications means a request for detailed information
concerning the qualifications of prospective Contractors.
EE. Reauisition means an approved written document making a request for
Goods and Services
FF. Responsible Bidder means a bidder who has demonstrated the attribute of
trustworthiness, as well as quality, fitness, capacity, and experience to
satisfactorily perform the requested services or project.
GG. Responsive Bidder/ Proposer means a bidder/proposer who has
submitted a bid/proposal which conforms in all material respects to the
Notice Inviting Bids/Invitation for Bids/Request for Proposals.
HH. Services means the furnishing of labor, time, or effort by a Contractor.
Services include both general services Qanitorial, landscape, repair,
maintenance, etc.) and professional services, unless otherwise specified.
II. Sealed (Bids or Proposals) means the submittal of bids or proposals,
either in paper or electronic format, whereby the bid or proposal
documents are opened at a specific time and not before.
JJ. Sole Source Procurement means the acquisition of Goods and/or Services
from a single source.
KK. Solicitation Protest Statement shall mean a written objection during the
solicitation phase of the procurement, which shall be submitted prior to the
bid due date as specified herein.
LL. Standing Committee means one of the permanent committees designated
by the Board of Directors as "Standing Committees."
MM. Task Order means a written document pursuant to a Contract issued by
the Purchasing Manager which provides for the issuance of orders,
containing a defined budget, scope of services, and schedule, and
authorizes a Contractor to incur a specified amount for the performance of
tasks.
OCSD-XX-30
Return to Mende Report
PASSED AND ADOPTED by a majority of the Board of Directors of the Orange County
Sanitation District at a Regular Meeting held November 20, 2013.
Troy Edgar
Chairman of the Board of Directors
Orange County Sanitation District
ATTEST:
Maria E. Ayala
Clerk of the Board
Orange County Sanitation District
APPROVED AS TO FORM:
Bradley R. Hogin, General Counsel
OCSD-XX-31
STATE OF CALIFORNIA)
)SS.
COUNTY OF ORANGE )
I, MARIA E. AYALA, Clerk of the Board of Directors of Orange County Sanitation
District, do hereby certify that the above and foregoing Ordinance No. OCSD-XX was
introduced for first reading at a regular meeting of said Board on the 23rd day of
October, 2013 and passed and adopted at a regular meeting of said Board on the
day of , 2013, by the following vote, to wit:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand this day of ,
2013.
Maria E. Ayala
Clerk of the Board
Orange County Sanitation District
OCSD-XX-32
ORANGE COUNTY SANITATION DISTRICT
Agenda
Terminology Glossary
AQMD Air Quality Management District
ASCE American Society of Civil Engineers
BOO Biochemical Oxygen Demand
CARB California Air Resources Board
CASA California Association of Sanitation Agencies
CCTV Closed Circuit Television
CEQA California Environmental Quality Act
CRWQCB California Regional Water Quality Control Board
CWA Clean Water Act
CWEA California Water Environment Association
EIR Environmental Impact Report
EMT Executive Management Team
EPA U.S. Environmental Protection Agency
FOG Fats, Oils, and Grease
FSSD Facilities Support Services Department
gpd Gallons per day
GWR System Groundwater Replenishment System (also called GWRS)
LOS Level of Service
MGD Million gallons per day
NACWA National Association of Clean Water Agencies
NPDES National Pollutant Discharge Elimination System
NWRI National Water Research Institute
O&M Operations and Maintenance
OCCOG Orange County Council of Governments
OCHCA Orange County Health Care Agency
OCSD Orange County Sanitation District
OCWD Orange County Water District
OOBS Ocean Outfall Booster Station
OSHA Occupational Safety and Health Administration
POTW Publicly Owned Treatment Works
ppm Parts per million
RFP Request For Proposal
RWQCB Regional Water Quality Control Board
SARFPA Santa Ana River Flood Protection Agency
SARI Santa Ana River Inceptor
SARWQCB Santa Ana Regional Water Quality Control Board
SAWPA Santa Ana Watershed Project Authority
SCADA Supervisory Control and Data Acquisition system
SCAP Southern California Alliance of Publicly Owned Treatment Works
SCAQMD South Coast Air Quality Management District
SOCWA South Orange County Wastewater Authority
SSMP Sanitary Sewer Management Plan
SSO Sanitary Sewer Overflow
SWRCB State Water Resources Control Board
TDS Total Dissolved Solids
TMDL Total Maximum Daily Load
TSS Total Suspended Solids
WDR Waste Discharge Requirements
WEF Water Environment Federation
WERF Water Environment Research Foundation
Activated-sludge process — A secondary biological wastewater treatment process where bacteria
reproduce at a high rate with the introduction of excess air or oxygen, and consume dissolved
nutrients in the wastewater.
Biochemical Oxygen Demand (BOD)—The amount of oxygen used when organic matter undergoes
decomposition by microorganisms. Testing for BOD is done to assess the amount of organic matter in
water.
Biosolids — Biosolids are nutrient rich organic and highly treated solid materials produced by the
wastewater treatment process. This high-quality product can be recycled as a soil amendment on
farm land or further processed as an earth-like product for commercial and home gardens to improve
and maintain fertile soil and stimulate plant growth.
Capital Improvement Program (CIP) — Projects for repair, rehabilitation, and replacement of assets.
Also includes treatment improvements, additional capacity, and projects for the support facilities.
Coliform bacteria—A group of bacteria found in the intestines of humans and other animals, but also
occasionally found elsewhere used as indicators of sewage pollution. E. coli are the most common
bacteria in wastewater.
Collections system — In wastewater, it is the system of typically underground pipes that receive and
convey sanitary wastewater or storm water.
Certificate of Participation (COP) — A type of financing where an investor purchases a share of the
lease revenues of a program rather than the bond being secured by those revenues.
Contaminants of Potential Concern (CPC) — Pharmaceuticals, hormones, and other organic
wastewater contaminants.
Dilution to Threshold (DR) — the dilution at which the majority of the people detect the odor
becomes the D(f for that air sample.
Greenhouse gases — In the order of relative abundance water vapor, carbon dioxide, methane,
nitrous oxide, and ozone gases that are considered the cause of global warming ("greenhouse
effect').
Groundwater Replenishment (GWR) System — A joint water reclamation project that proactively
responds to Southern California's current and future water needs. This joint project between the
Orange County Water District and the Orange County Sanitation District provides 70 million gallons a
day of drinking quality water to replenish the local groundwater supply.
Levels of Service (LOS)—Goals to support environmental and public expectations for performance.
NOMA— N-Nitrosodimethylamine is an N-nitrosoamine suspected cancer-causing agent. It has been
found in the Groundwater Replenishment System process and is eliminated using hydrogen peroxide
with extra ultra-violet treatment.
National Biosolids Partnership (NBP) — An alliance of the National Association of Clean Water
Agencies (NACWA) and Water Environment Federation (WEF), with advisory support from the U.S.
Environmental Protection Agency (EPA). NBP is committed to developing and advancing
environmentally sound and sustainable biosolids management practices that go beyond regulatory
compliance and promote public participation in order to enhance the credibility of local agency
biosolids programs and improved communications that lead to public acceptance.
Plume—A visible or measurable concentration of discharge from a stationary source or fixed facility.
Publicly-owned Treatment Works (POTW)— Municipal wastewater treatment plant.
Santa Ana River Interceptor (SARI) Line — A regional brine line designed to convey 30 million
gallons per day (MGD) of non-reclaimable wastewater from the upper Santa Ana River basin to the
ocean for disposal, after treatment.
Sanitary sewer — Separate sewer systems specifically for the carrying of domestic and industrial
wastewater. Combined sewers carry both wastewater and urban run-off.
South Coast Air Quality Management District (SCAQMD) — Regional regulatory agency that
develops plans and regulations designed to achieve public health standards by reducing emissions
from business and industry.
Secondary treatment — Biological wastewater treatment, particularly the activated-sludge process,
where bacteria and other microorganisms consume dissolved nutrients in wastewater.
Sludge—Untreated solid material created by the treatment of wastewater.
Total suspended solids (TSS)—The amount of solids floating and in suspension in wastewater.
Trickling filter — A biological secondary treatment process in which bacteria and other
microorganisms, growing as slime on the surface of rocks or plastic media, consume nutrients in
wastewater as it trickles over them.
Urban runoff — Water from city streets and domestic properties that carry pollutants into the storm
drains, rivers, lakes, and oceans.
Wastewater—Any water that enters the sanitary sewer.
Watershed —A land area from which water drains to a particular water body. OCSD's service area is
in the Santa Ana River Watershed.