HomeMy WebLinkAboutLate Communication Item No. 3 - SANY Crane Replacement.pdfPresented by Rob Thompson
Assistant General Manager
SANY Crane Replacement
Bar Screens
Skylight Removal
Access to Bar Screen –111-ft lift through roof
Bar Screen through roof
Trickling Filters
Trickling Filter Motor –170-ft lift
RSS Pump & P1 Clarifiers
Vertical Turbine Pump 111-ft lift, 45-ft length, 4 1/2-ton Secondary Clarifier Motor 111-ft lift
SANY Crane
Proposed Procurement Highlights
•Crane specification updated to meet current AQMD requirements
•Quotes received from two suppliers through CO-OP BID Contracts
•Cranes proposed have been in service in USA, for five years or more
•Proposed procurement provides a total savings to OCSD of
$281,000
•Savings realized from delivery of a crane at vendors lot, saving fabrication
•Auction proceeds returned to general fund –offsets cost
•Crane operators have direct experience with the proposed crane