Loading...
HomeMy WebLinkAboutLate Communication Item No. 3 - SANY Crane Replacement.pdfPresented by Rob Thompson Assistant General Manager SANY Crane Replacement Bar Screens Skylight Removal Access to Bar Screen –111-ft lift through roof Bar Screen through roof Trickling Filters Trickling Filter Motor –170-ft lift RSS Pump & P1 Clarifiers Vertical Turbine Pump 111-ft lift, 45-ft length, 4 1/2-ton Secondary Clarifier Motor 111-ft lift SANY Crane Proposed Procurement Highlights •Crane specification updated to meet current AQMD requirements •Quotes received from two suppliers through CO-OP BID Contracts •Cranes proposed have been in service in USA, for five years or more •Proposed procurement provides a total savings to OCSD of $281,000 •Savings realized from delivery of a crane at vendors lot, saving fabrication •Auction proceeds returned to general fund –offsets cost •Crane operators have direct experience with the proposed crane