HomeMy WebLinkAbout07-05-2017 Operations Committee Meeting Supplemental Agenda Orange County Sanitation District Wednesday, July 5, 2017
Regular Meeting of the 5:00 P.M.
OPERATIONS COMMITTEE Board Room
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
SUPPLEMENTAL
AGENDA
At the request of the Director of Operations and Maintenance, the following item will be
pulled from consideration:
CONSENT CALENDAR:
4. PREVENTATIVE MAINTENANCE OF STANDBY EMERGENCY ELECTRICAL
GENERATORS, SPECIFICATION NO. 9-2017-822BD (Ed Torres)
At the direction of the Board of Directors, meeting of June 28, 2017, the following item
will be added to the agenda for consideration:
NON-CONSENT ITEMS:
9.1 REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND
PAVING AREA, CONTRACT NO. PI-115B (Rob Thompson)
RECOMMENDATION: Recommend to the Board of Directors to:
A. Receive and file bid tabulation and recommendation;
B. Award a construction contract to ODC Engineering and Technology for
Rehabilitation of Fleet Services Building, Building 8 and Paving Area,
Contract No. P1-1158, part of Title 24 Access Compliance and Building
Rehabilitation, Project No. 121-115, for a total amount not to exceed
$2,235,609;
C. Approve a contingency of$223,563 (10%); and
D. Approve a budget increase of$791,000 for Title 24 Access Compliance and
Building Rehabilitation, Project No. P1-115, for a total budget amount of
$18,400,000.
Page 2 of 2
The following items were approved at the regular meeting of the Board of Directors held
June 28, 2017, At the direction of the Board of Directors, these items will be added to the
agenda for additional information only.
INFORMATION ITEMS:
11. LANE CHANNEL CROSSING PROJECT— PROJECT NO. FE16-11
(Rob Thompson)
12. PLANT NO. 1 PRIMARY CLARIFIER REHABILITATION (Ed Torres)
I hereby certify under penalty of perjury under the laws of the State of California that the foregoing
Supplemental Agenda was posted outside the main gate of the District's Administration Building located at
10844 Ellis Avenue, Fountain Valley, California not less than 72 hours prior to the meeting. Dated this 290
day of June 2017//n�j/
l�
Kell A. L CMC
Cle k of th card
OPERATIONS COMMITTEE Meeting Date TO Bd.dDir.
0
7/0
5
/17 07/26/17
AGENDA REPORT Rem Number rem Number
9.1
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Director of Engineering
SUBJECT: REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND
PAVING AREA, CONTRACT NO. P1-115B
GENERAL MANAGER'S RECOMMENDATION
A. Receive and file bid tabulation and recommendation;
B. Award a construction contract to ODC Engineering and Technology for
Rehabilitation of Fleet Services Building, Building 8 and Paving Area, Contract
No. P1-115B, part of Title 24 Access Compliance and Building Rehabilitation,
Project No. P1-115, fora total amount not to exceed $2,235,609;
C. Approve a contingency of $223,563 (10%); and
D. Approve a budget increase of $791,000 for Title 24 Access Compliance and
Building Rehabilitation, Project No. P1-115, for a total budget amount of
$18,400,000.
BACKGROUND
Rehabilitation of Fleet Services Building, Building 8 and Paving Area, Contract
No. P1-115B, is the second of two construction contracts under Title 24 Access
Compliance and Building Rehabilitation, Project No. P1-115, which retrofits existing
support buildings and trailers at Plant No. 1 to meet accessibility and other code
requirements, and provide maintenance replacements such as roofs and lighting.
The scope of Contract No. P1-115A included refurbishment of Buildings 1, 2, 3, 4, 5, 6,
and 7; Shop A and B; demolition of Building H; and general grading and paving of the
area. This construction contract generally refurbished the buildings listed, extending their
service life and bringing them into compliance with new safety, energy, access, and
seismic regulations to satisfy an agreement with the City of Fountain Valley regarding
building permitting.
The scope of Contract No. P1-115B includes replacement of roofing at Building 8 and the
Fleet Services Building, installation of guardrail along the roofs, upgrades to the lighting
inside both buildings, and office renovations in the Fleet Services Building to provide an
equal facilitation restroom. Additionally, the project will install car charging stations for
the Orange County Sanitation District's (Sanitation District) electric vehicles recently
added to its fleet, and will replace the deteriorated pavement in the surrounding parking
lot areas.
Page 1 d 4
The Sanitation District received two sealed bids on May 24, 2017. The low bid exceeded
the engineer's estimate by approximately 6%. The bids were evaluated in accordance
with the Sanitation District's policies and procedures.
Staff estimates that this project will require an additional $791,000 of project budget. The
additional budget is requested to cover greater staff effort with a longer construction
duration, a higher bid cost than assumed for the previous budget, and higher than
anticipated staff costs associated with closing out the first of the two construction
contracts. The staff budget had been based on a construction duration of 300 calendar
days, but as the final design was completed, it was realized that 485 calendar days would
be needed to sequence the work to maintain productive use of the facilities during
construction.
RELEVANT STANDARDS
• CA Government Code Section 20783: Award to the "Lowest Responsive and
Responsible Bidder."
PROBLEM
Building 8 and the Fleet Services buildings need maintenance repairs and upgrades to
meet accessibility requirements and other code requirements. Also, the surrounding
pavement is in poor condition and needs to be replaced to provide proper drainage.
Based on the higher bid amount of this contract, greater staff effort associated with a
longer construction duration, and higher than anticipated staff costs to complete Contract
No. P1-115A, an increase in the project budget of$791,000 is recommended.
PROPOSED SOLUTION
Award the construction contract, Rehabilitation of Fleet Services Building, Building 8 and
Paving Area, Contract No. P1-11513, and increase the project budget.
TIMING CONCERNS
The roofs at both buildings are in need of replacement and also need upgrades to meet
accessibility and current code requirements. Since the work includes roof repairs, starting
the project in the summer 2017 will allow the Contractor to replace the roofs before the
wet weather season.
RAMIFICATIONS OF NOT TAKING ACTION
Increased repair costs from leaking roofs and potential safety concerns due to
accessibility to rooftop equipment.
Page 2 of 4
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
The Sanitation District advertised for bids on April 18, 2017 and April 25, 2017. Two
sealed bids were received on May 24, 2017. The bids were evaluated in accordance with
the Sanitation District's policies and procedures.
Staff recommends awarding a construction contract to ODC Engineering and Technology
for Rehabilitation of Fleet Services Building, Building 8 and Paving Area, Contract
No. P1-115B, for a total amount not to exceed $2,235,609.
Summary information on the bid opening for Rehabilitation of Fleet Services Building,
Building 8 and Paving Area, Contract No. P1-115B, is as follows:
Project Budget $17,509,000
Engineer's Estimate $ 2,100,000
Lowest Responsive, Responsible Bid $ 2,235,609
High Bid $ 3,990,000
Bidders Amount of Bid
ODC Engineering and Technology $ 2,235,609
Neman-Midland Corporation $ 3,990,000
Both sealed bids exceeded the Engineer's Estimate of$2,100,000, and staff recommends
an increase of$791,000 to cover the added construction cost, contingency, and staffing
costs needed for this Contract.
CEQA
A Notice of Exemption was filed and recorded with the County of Orange on
January 5, 2011. This project is exempt under Section 15301, Class 1, because it
involves minor modifications or replacement of existing facilities involving no expansion
of use or capacity beyond that existing at the time of the lead agency's determination.
FINANCIAL CONSIDERATIONS
This request complies with authority levels of the Sanitation District's Purchasing
Ordinance. This item has been budgeted (Budget FY2016-17 and 2017-18, Section 8,
Page 87), but the budget is insufficient for the recommended action. The funds will be
allocated to the projectfrom the Replacement, Rehabilitation, and Refurbishment line item
in the cash flow projections, FY2016-17 and 2017-18, Section 4, Page 16.
Page 3 d 4
ATTACHMENT
The following attachment(s)maybe viewed on-line at the OCSD website(www.ocsd.com)with the complete
agenda package:
• Construction Contract
AL:dm:gc
Page 4 of 4
PART A
CONTRACT AGREEMENT
C-CA-011317
TABLE OF CONTENTS
CONTRACT AGREEMENT
SECTION - 1 GENERAL CONDITIONS..................................................................1
SECTION -2 MATERIALS AND LABOR.................................................................4
SECTION -3 PROJECT..........................................................................................5
SECTION -4 PLANS AND SPECIFICATONS ........................................................5
SECTION -5 TIME OF COMMENCEMENT AND COMPLETION ..........................5
SECTION -6 TIME IS OF THE ESSENCE .............................................................6
SECTION -7 EXCUSABLE DELAYS......................................................................6
SECTION -8 EXTRA WORK...................................................................................7
SECTION -9 CHANGES IN PROJECT...................................................................7
SECTION - 10 LIQUIDATED DAMAGES FOR DELAY.............................................8
SECTION - 11 CONTRACT PRICE AND METHOD OF PAYMENT.........................8
SECTION - 12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF
FUNDS ............................................................................................10
SECTION - 13 COMPLETION.................................................................................10
SECTION - 14 CONTRACTOR'S EMPLOYEES COMPENSATION.......................10
SECTION - 15 SURETY BONDS ............................................................................12
SECTION - 16 INSURANCE....................................................................................13
SECTION - 17 RISK AND INDEMNIFICATION.......................................................22
SECTION - 18 TERMINATION................................................................................23
SECTION - 19 WARRANTY....................................................................................23
SECTION -20 ASSIGNMENT.................................................................................24
SECTION -21 RESOLUTION OF DISPUTES ........................................................24
SECTION -22 SAFETY& HEALTH ........................................................................24
SECTION -23 NOTICES.........................................................................................25
C-CA-011317
CONTRACT AGREEMENT
ORANGE COUNTY SANITATION DISTRICT
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Part of
PROJECT NO. P1-115
TITLE 24 ACCESS COMPLIANCE AND BUILDING REHABILITATION PROJECT
THIS AGREEMENT is made and entered into, to be effective, this July 26, 2017, by and
between ODC Engineering and Technology, hereinafter referred to as"CONTRACTOR" and the
Orange County Sanitation District, hereinafter referred to as "OCSD".
WITNESSETH
That for and in consideration of the promises and agreements hereinafter made and exchanged,
OCSD and CONTRACTOR agree as follows:
SECTION-1 GENERAL CONDITIONS
CONTRACTOR certifies and agrees that all the terms, conditions and obligations of the
Contract Documents as hereinafter defined, the location of the job site, and the conditions under
which the Work is to be performed have been thoroughly reviewed, and enters into this Contract
based upon CONTRACTOR's investigation of all such matters and is in no way relying upon
any opinions or representations of OCSD. It is agreed that this Contract represents the entire
agreement. It is further agreed that the Contract Documents are each incorporated into this
Contract by reference, with the same force and effect as if the same were set forth at length
herein, and that CONTRACTOR and its Subcontractors, if any, will be and are bound by any
and all of said Contract Documents insofar as they relate in any part or in any way, directly or
indirectly, to the Work covered by this Contract.
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 1 of 26
A. Contract Documents Order of Precedence
"Contract Documents" refers to those documents identified in the definition of"Contract
Documents" in the General Conditions—Definitions.
1. In the event of a conflict between one Contract Document and any of the other
Contract Documents, the provisions in the document highest in precedence shall be
controlling. The order of precedence of the Contract Documents is as follows:
a. Supplemental Agreements—the last in time being the first in precedence
b. Addenda issued prior to opening of Bids—the last in time being the first in
precedence
c. Contract Agreement
d. Permits and other regulatory requirements
e. Special Provisions
f. General Conditions (GC)
g. Notice Inviting Bids and Instruction to Bidders
h. Geotechnical Baseline Report(GBR), if attached as a Contract Document
I. Plans and Specifications—in these documents the order of precedence shall be:
i. Specifications (Divisions 01-17)
ii. Plans
H. General Requirements (GR)
iv. Standard Drawings and Typical Details
j. CONTRACTOR'S Bid
2. In the event of a conflict between terms within an individual Contract Document, the
conflict shall be resolved by applying the following principles as appears applicable:
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 2 of 26
a. Figured dimensions on the Contract Documents shall govern. Dimensions not
specified shall be as directed by the ENGINEER. Details not shown or
specified shall be the same as similar parts that are shown or specified, or as
directed. Full-size details shall take precedence over scale Drawings as to
shape and details of construction. Specifications shall govern as to material
and workmanship.
b. The Contract Documents calling for the higher quality material or workmanship
shall prevail. Materials or Work described in words, which so applied, have a
well known technical or trade meaning shall be deemed to refer to such
recognized standards. In the event of any discrepancy between any Drawings
and the figures thereon, the figures shall be taken as correct.
C. Scale Drawings, full-size details, and Specifications are intended to be fully
complementary and to agree. Should any discrepancy between Contract
Documents come to the CONTRACTOR's attention, or should an error occur in
the efforts of others, which affect the Work, the CONTRACTOR shall notify the
ENGINEER, in writing, at once. In the event any doubts or questions arise with
respect to the true meaning of the Contract Documents, reference shall be
made to the ENGINEER whose written decision shall be final. If the
CONTRACTOR proceeds with the Work affected without written instructions
from the ENGINEER, the CONTRACTOR shall be fully responsible for any
resultant damage or defect.
d. Anything mentioned in the Specifications and not indicated in the Plans, or
indicated in the Plans and not mentioned in the Specifications, shall be of like
effect as if indicated and mentioned in both. In case of discrepancy in the
Plans or Specifications, the matter shall be immediately submitted to OCSD's
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 3 of 26
ENGINEER, without whose decision CONTRACTOR shall not adjust said
discrepancy save only at CONTRACTOR's own risk and expense. The
decision of the ENGINEER shall be final.
In all matters relating to the acceptability of material, machinery or plant equipment;
classifications of material or Work; the proper execution, progress or sequence of the
Work; and quantities interpretation of the Contract Documents, the decision of the
ENGINEER shall be final and binding, and shall be a condition precedent to any payment
under the Contract, unless otherwise ordered by the Board of Directors.
B. Definitions
Capitalized terms used in this Contract are defined in the General Conditions, Definitions.
Additional terms may be defined in the Special Provisions.
SECTION-2 MATERIALS AND LABOR
CONTRACTOR shall furnish, under the conditions expressed in the Plans and Specifications, at
CONTRACTOR'S own expense, all labor and materials necessary, except such as are
mentioned in the Specifications to be furnished by OCSD, to construct and complete the
Project, in good workmanlike and substantial order. If CONTRACTOR fails to pay for labor or
materials when due, OCSD may settle such claims by making demand upon the Surety to this
Contract. In the event of the failure or refusal of the Surety to satisfy said claims, OCSD may
settle them directly and deduct the amount of payments from the Contract Price and any
amounts due to CONTRACTOR. In the event OCSD receives a stop payment notice from any
laborer or material supplier alleging non-payment by CONTRACTOR, OCSD shall be entitled to
deduct all of its costs and expenses incurred relating thereto, including but not limited to
administrative and legal fees.
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 4 of 26
SECTION-3 PROJECT
The Project is described as:
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Part of
PROJECT NO. P1-115
TITLE 24 ACCESS COMPLIANCE AND BUILDING REHABILITATION PROJECT
SECTION —4 PLANS AND SPECIFICATONS
The Work to be done is shown in a set of Plans and Specifications entitled:
CONTRACT NO. PI-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Part of
PROJECT NO. P1-115
TITLE 24 ACCESS COMPLIANCE AND BUILDING REHABILITATION PROJECT
Said Plans and Specifications and any revision, amendments and addenda thereto are
attached hereto and incorporated herein as part of this Contract and referred to by reference.
SECTION-5 TIME OF COMMENCEMENT AND COMPLETION
CONTRACTOR agrees to commence the Project within 15 calendar days from the date set forth
in the "Notice to Proceed"sent by OCSD, unless otherwise specified therein and shall diligently
prosecute the Work to completion within 485 calendar days from the date of the "Notice to
Proceed" issued by OCSD, excluding delays caused or authorized by OCSD as set forth in
Sections 7, 8, and 9 hereof, and applicable provisions in the General Conditions. The time for
completion includes Fifteen (15)calendar days determined by OCSD likely to be inclement
weather when CONTRACTOR will be unable to work.
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 5 of 26
In addition, CONTRACTOR shall accomplish such milestones within the periods of performance
set forth in Appendix A of the Special Provisions entitled "Work Completion Schedule."
SECTION—6 TIME IS OF THE ESSENCE
Time is of the essence of this Contract. As required by the Contract Documents,
CONTRACTOR shall prepare and obtain approval of all shop drawings, details and samples,
and do all other things necessary and incidental to the prosecution of CONTRACTOR's Work in
conformance with an approved construction progress schedule. CONTRACTOR shall
coordinate the Work covered by this Contract with that of all other contractors, subcontractors
and of OCSD, in a manner that will facilitate the efficient completion of the entire Work and
accomplish the required milestone(s), if any, by the applicable deadline(s) in accordance with
Section 5 herein. OCSD shall have the right to assert complete control of the premises on
which the Work is to be performed and shall have the right to decide the time or order in which
the various portions of the Work shall be installed or the priority of the work of subcontractors,
and, in general, all matters representing the timely and orderly conduct of the Work of
CONTRACTOR on the premises.
SECTION—7 EXCUSABLE DELAYS
CONTRACTOR shall only be excused for any delay in the prosecution or completion of the
Project as specifically provided in General Conditions, "Extensions for Delay", and the General
Requirements, "By CONTRACTOR or Others—Unknown Utilities during Contract Work".
Extensions of time and extra compensation arising from such excusable delays will be
determined in accordance with the General Conditions, "Extension of Time for Delay" and
"Contract Price Adjustments and Payments", and extensions of time and extra compensation as
a result of incurring undisclosed utilities will be determined in accordance with General
Requirements, 'By CONTRACTOR or Others— Unknown Utilities during Contract Work".
OCSD's decision will be conclusive on all parties to this Contract.
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 6 of 26
SECTION-8 EXTRA WORK
The Contract Price as set forth in Section 11, includes compensation for all Work performed by
CONTRACTOR, unless CONTRACTOR obtains a Change Order signed by a designated
representative of OCSD specifying the exact nature of the Extra Work and the amount of extra
compensation to be paid all as more particularly set forth in Section 9 hereof and the General
Conditions, "Request for Change (Changes at CONTRACTOR's Request)", "OWNER Initiated
Changes", and "Contract Price Adjustments and Payments".
In the event a Change Order is issued by OCSD pursuant to the Contract Documents, OCSD
shall extend the time fixed in Section 5 for completion of the Project by the number of days, if
any, reasonably required for CONTRACTOR to perform the Extra Work, as determined by
OCSD's ENGINEER. The decision of the ENGINEER shall be final.
SECTION-9 CHANGES IN PROJECT
OCSD may at any time, without notice to any Surety, by Change Order, make any changes in the
Work within the general scope of the Contract Document, including but not limited to changes:
1. In the Specifications (including Drawings and designs);
2. In the time, method or manner of performance of the Work;
3. In OCSD-furnished facilities, equipment, materials, services or site; or
4. Directing acceleration in the performance of the Work.
No change of period of performance or Contract Price, or any other change in the Contract
Documents, shall be binding until the Contract is modified by a fully executed Change Order.
All Change Orders shall be issued in accordance with the requirements set forth in the General
Conditions, "Request for Change (Changes at CONTRACTOR's Request)" and "OWNER
Initiated Changes'.
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 7 of 26
SECTION-10 LIQUIDATED DAMAGES FOR DELAY
Liquidated Damages shall be payable in the amounts and upon the occurrence of such events
or failure to meet such requirements or deadlines as provided in the Special Provisions,
"Liquidated Damages and Incentives."
SECTION—11 CONTRACT PRICE AND METHOD OF PAYMENT
A. OCSD agrees to pay and the CONTRACTOR agrees to accept as full consideration for the
faithful performance of this Contract, subject to any additions or deductions as provided in
approved Change Orders, the sum of Two Million Two Hundred Thirty-Five Thousand Six
Hundred Nine Dollars ($2,235,609)as itemized on the Attached Exhibit W'.
Upon satisfaction of the conditions precedent to payment set forth in the General
Requirements, Additional General Requirements and General Conditions (including but
not limited to Sections entitled "Mobilization Payment Requirements" and "Payment
Itemized Breakdown of Contract Lump Sum Prices"), there shall be paid to the
CONTRACTOR an initial Net Progress Payment for mobilization. OCSD shall issue at the
commencement of the job a schedule which shows:
1. A minimum of one payment to be made to the CONTRACTOR for each successive
four(4)week period as the Work progresses, and
2. The due dates for the CONTRACTOR to submit requests for payment to meet the
payment schedule.
After the initial Net Progress Payment, and provided the CONTRACTOR submits the
request for payment prior to the end of the day required to meet the payment schedule,
the CONTRACTOR shall be paid a Net Progress Payment on the corresponding monthly
payment date set forth in the schedule.
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 8 of 26
Payments shall be made on demands drawn in the manner required by law, accompanied
by a certificate signed by the ENGINEER, stating that the Work for which payment is
demanded has been performed in accordance with the terms of the Contract Documents,
and that the amount stated in the certificate is due under the terms of the Contract. Payment
applications shall also be accompanied with all documentation, records, and releases as
required by the Contract, Exhibit A, Schedule of Prices, and General Conditions, "Payment
for Work—General". The Total amount of Progress Payments shall not exceed the actual
value of the Work completed as certified by OCSD's ENGINEER. The processing of
payments shall not be considered as an acceptance of any part of the Work.
B. As used in this Section, the following defined terms shall have the following meanings:
1. "Net Progress Payment" means a sum equal to the Progress Payment less the
Retention Amount and other qualified deductions (Liquidated Damages, stop
payment notices, etc.).
2. "Progress Payment" means a sum equal to:
a. the value of the actual Work completed since the commencement of the Work
as determined by OCSD;
b. plus the value of material suitably stored at the worksite, treatment plant or
approved storage yards subject to or under the control of OCSD since the
commencement of the Work as determined by OCSD;
C. less all previous Net Progress Payments;
d. less all amounts of previously qualified deductions;
e. less all amounts previously retained as Retention Amounts.
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 9 of 26
3. "Retention Amount"for each Progress Payment means the percentage of each
Progress Payment to be retained by OCSD to assure satisfactory completion of the
Contract. The amount to be retained from each Progress Payment shall be determined
as provided in the General Conditions—"Retained Funds; Substitution of Securities"
SECTION—12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF FUNDS
Pursuant to Public Contract Code Section 22300 at seq., the CONTRACTOR may, at its sole
expense, substitute securities as provided in General Conditions—"Retained Funds;
Substitution of Securities."
SECTION—13 COMPLETION
Final Completion and Final Acceptance shall occur at the time and in the manner specified in the
General Conditions, "Final Acceptance and Final Completion", "Final Payment" and Exhibit A-
Schedule of Prices.
Upon receipt of all documentation, records, and releases as required by the Contract from the
CONTRACTOR, OCSD shall proceed with the Final Acceptance as specified in General Conditions.
SECTION— 14 CONTRACTOR'S EMPLOYEES COMPENSATION
A. Davis-Bacon Act:
CONTRACTOR will pay and will require all Subcontractors to pay all employees on said
Project a salary or wage at least equal to the prevailing rate of per diem wages as
determined by the Secretary of Labor in accordance with the Davis-Bacon Act for each craft
or type of worker needed to perform the Contract. The provisions of the Davis-Bacon Act
shall apply only if the Contract is in excess of Two Thousand Dollars ($2,000.00) and when
twenty-five percent (25%)or more of the Contract is funded by federal assistance. If the
aforesaid conditions are met, a copy of the provisions of the Davis-Bacon Act to be complied
with are incorporated herein as a part of this Contract and referred to by reference.
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 10 of 26
B. General Prevailing Rate:
OCSD has been advised by the State of California Director of Industrial Relations of its
determination of the general prevailing rate of per diem wages and the general prevailing
rate for legal holiday and overtime Work in the locality in which the Work is to be
performed for each craft or type of Work needed to execute this Contract, and copies of
the same are on file in the Office of the ENGINEER of OCSD. The CONTRACTOR
agrees that not less than said prevailing rates shall be paid to workers employed on this
public works Contract as required by Labor Code Section 1774 of the State of California.
Per California Labor Code 1773.2, OCSD will have on file copies of the prevailing rate of
per diem wages at its principal office and at each job site, which shall be made available to
any interested party upon request.
C. Forfeiture for Violation:
CONTRACTOR shall, as a penalty to OCSD, forfeit Two Hundred Dollars ($200.00)for
each calendar day or portion thereof for each worker paid (either by the CONTRACTOR or
any Subcontractor under it) less than the prevailing rate of per diem wages as set by the
Director of Industrial Relations, in accordance with Sections 1770-1780 of the California
Labor Code for the Work provided for in this Contract, all in accordance with Section 1775
of the Labor Code of the State of California.
D. Apprentices:
Sections 1777.5, 1777.6, 1777.7 of the Labor Code of the State of California, regarding
the employment of apprentices are applicable to this Contract and the CONTRACTOR
shall comply therewith if the prime contract involves Thirty Thousand Dollars ($30,000.00)
or more.
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 11 of 26
E. Workday:
In the performance of this Contract, not more than eight(8) hours shall constitute a day's
work, and the CONTRACTOR shall not require more than eight (8) hours of labor in a day
from any person employed by him hereunder except as provided in paragraph (B) above.
CONTRACTOR shall conform to Article 3, Chapter 1, Part 7 (Section 1810 at seq.)of the
Labor Code of the State of California and shall forfeit to OCSD as a penalty, the sum of
Twenty-five Dollars ($25.00)for each worker employed in the execution of this Contract by
CONTRACTOR or any Subcontractor for each calendar day during which any worker is
required or permitted to labor more than eight (8) hours in any one calendar day and forty
(40) hours in any one week in violation of said Article. CONTRACTOR shall keep an
accurate record showing the name and actual hours worked each calendar day and each
calendar week by each worker employed by CONTRACTOR in connection with the Project.
F. Registration: Record of Wages: Insoection:
CONTRACTOR shall comply with the registration requirements of Labor Code Section 1725.5.
Pursuant to Labor Code Section 1771.4, the Work is subject to compliance monitoring by the
California Department of Industrial Relations. CONTRACTOR shall maintain accurate payroll
records and shall submit payroll records to the Labor Commissioner pursuant to Labor Code
Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may
be deducted from progress payments per Section 1776.
CONTRACTOR shall comply with the job site notices posting requirements established by
the Labor Commissioner per Title 8, California Code of Regulations Section 16461(a).
SECTION-15 SURETYBONDS
CONTRACTOR shall, before entering upon the performance of this Contract, furnish Bonds
approved by OCSD's General Counsel—one in the amount of one hundred percent (100%)of
the Contract amount, to guarantee the faithful performance of the Work, and the other in the
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 12 of 26
amount of one hundred percent (100%)of the Contract amount to guarantee payment of all
claims for labor and materials furnished. As changes to the Contract occur via approved
Change Orders, the CONTRACTOR shall assure that the amounts of the Bonds are adjusted to
maintain 100% of the Contract Price. This Contract shall not become effective until such Bonds
are supplied to and approved by OCSD. Bonds must be issued by a Surety authorized by the
State Insurance Commissioner to do business in California. The Performance Bond shall
remain in full force and effect through the warranty period, as specified in Section 19 below. All
Bonds required to be submitted relating to this Contract must comply with California Code of
Civil Procedure Section 995.630. Each Bond shall be executed in the name of the Surety
insurer under penalty of perjury, or the fact of execution of each Bond shall be duly
acknowledged before an officer authorized to take and certify acknowledgments, and either one
of the following conditions shall be satisfied:
A. A copy of the transcript or record of the unrevoked appointment, power of attorney, by-
laws, or other instrument, duly certified by the proper authority and attested by the seal of
the insurer entitling or authorizing the person who executed the Bond to do so for and on
behalf of the insurer, is on file in the Office of the County Clerk of the County of Orange; or
B. A copy of a valid power of attorney is attached to the Bond.
SECTION— 16 INSURANCE
CONTRACTOR shall purchase and maintain, for the duration of the Contract, insurance against
claims for injuries to persons, or damages to property which may arise from or in connection
with the performance of the Work hereunder, and the results of that Work by CONTRACTOR,
its agents, representatives, employees, or Subcontractors, in amounts equal to the
requirements set forth below. CONTRACTOR shall not commence Work under this Contract
until all insurance required under this Section is obtained in a form acceptable to OCSD, nor
shall CONTRACTOR allow any Subcontractor to commence Work on a subcontract until all
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 13 of 26
insurance required of the Subcontractor has been obtained. CONTRACTOR shall maintain all
of the foregoing insurance coverages in force through the point at which the Work under this
Contract is fully completed and accepted by OCSD pursuant to the provisions of the General
Conditions, "Final Acceptance and Final Completion'. Furthermore, CONTRACTOR shall
maintain all of the foregoing insurance coverages in full force and effect throughout the warranty
period, commencing on the date of Final Acceptance. The requirement for carrying the
foregoing insurance shall not derogate from the provisions for indemnification of OCSD by
CONTRACTOR under Section 17 of this Contract. Notwithstanding nor diminishing the
obligations of CONTRACTOR with respect to the foregoing, CONTRACTOR shall subscribe for
and maintain in full force and effect during the life of this Contract, inclusive of all changes to the
Contract Documents made in accordance with the provisions of the General Conditions,
"Request for Change (Changes at CONTRACTOR's Request)" and/or"OWNER Initiated
Changes', the following insurance in amounts not less than the amounts specified. OCSD
reserves the right to amend the required limits of insurance commensurate with the
CONTRACTOR's risk at any time during the course of the Project. No vehicles may enter
OCSD Dremises/worksite without Dossessina the required insurance coverage.
CONTRACTOR's insurance shall also comply with all insurance requirements prescribed by
agencies from whom permits shall be obtained for the Work and any other third parties from
whom third party agreements are necessary to perform the Work (collectively, the "Third
Parties'), The Special Provisions may list such requirements and sample forms and
requirements from such Third Parties may be included in an attachment to the General
Requirements. CONTRACTOR bears the responsibility to discover and comply with all
requirements of Third Parties, including meeting specific insurance requirements, that are
necessary for the complete performance of the Work. To the extent there is a conflict between
C-CA-011317 CONFORMED
CONTRACT NO. Pl-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 14 of 26
the Third Parties' insurance requirements and those set forth by OCSD herein, the
requirement(s) providing the more protective coverage for both OSCD and the Third Parties
shall control and be purchased and maintained by CONTRACTOR.
A. Limits of Insurance
1. General Liability: Five Million Dollars ($5,000,000) per occurrence and a general
aggregate limit of Five Million Dollars ($5,000,000)for bodily injury, personal injury
and property damage. Coverage shall include each of the following:
a. Premises-Operations.
b. Products and Completed Operations, with limits of at least Five Million Dollars
($5,000,000) per occurrence and a general aggregate limit of Five Million
Dollars ($5,000,000)which shall be in effect at all times during the warranty
period set forth in the Warranty section herein, and as set forth in the General
Conditions, "Warranty(CONTRACTOR's Guarantee)", plus any additional
extension or continuation of time to said warranty period that may be required
or authorized by said provisions.
C. Broad Form Property Damage, expressly including damage arising out of
explosion, collapse, or underground damage.
d. Contractual Liability, expressly including the indemnity provisions assumed
under this Contract.
e. Separation of Insured Clause, providing that coverage applies separately to
each insured, except with respect to the limits of liability.
f. Independent CONTRACTOR's Liability.
To the extent first dollar coverage, including defense of any claim, is not
available to OCSD or any other additional insured because of any SIR,
deductible, or any other form of self insurance, CONTRACTOR is obligated to
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 15 of 26
assume responsibility of insurer until the deductible, SIR or other condition of
insurer assuming its defense and/or indemnity has been satisfied.
CONTRACTOR shall be responsible to pay any deductible or SIR.
g. If a crane will be used, the General Liability insurance will be endorsed to add
Riggers Liability coverage or its equivalent to cover the usage of the crane and
exposures with regard to the crane operators, riggers and others involved in
using the crane.
h. If divers will be used, the General Liability insurance will be endorsed to cover
marine liability or its equivalent to cover the usage of divers.
2. Automobile Liability: The CONTRACTOR shall maintain a policy of Automobile
Liability Insurance on a comprehensive form covering all owned, non-owned, and
hired automobiles, trucks, and other vehicles providing the following minimum limits
of liability coverage:
Either(1)a combined single limit of Five Million Dollars ($5,000,000) and a general
aggregate limit of Five Million Dollars ($5,000,000)for bodily injury, personal injury
and property damage;
Or alternatively, (2) Five Million Dollars ($5,000,000) per person for bodily injury and
Two Million Dollars ($2,000,000) per accident for property damage.
3. Umbrella Excess Liability: The minimum limits of general liability and automobile
liability insurance required, as set forth above, shall be provided for either in a single
policy of primary insurance or a combination of policies of primary and umbrella
excess coverage. Excess liability coverage shall be issued with limits of liability
which, when combined with the primary insurance, will equal the minimum limits for
general liability and automobile liability.
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 16 of 26
4. Drone Liability Insurance: If a drone will be used, drone liability insurance must be
maintained by CONTRACTOR in the amount of One Million Dollars ($1,000,000) in a
form acceptable by OCSD.
5. Worker's Compensation/Employer's Liability: CONTRACTOR shall provide such Worker's
Compensation Insurance as required by the Labor Code of the State of California,
including employer's liability with a minimum limit of One Million Dollars ($1,000,000) per
accident for bodily injury or disease. If an exposure to Jones Act liability may exist, the
insurance required herein shall include coverage with regard to Jones Act claims.
Where permitted by law, CONTRACTOR hereby waives all rights of recovery by
subrogation because of deductible clauses, inadequacy of limits of any insurance
policy, limitations or exclusions of coverage, or any other reason against OCSD, its
or their officers, agents, or employees, and any other contractor or subcontractor
performing Work or rendering services on behalf of OCSD in connection with the
planning, development and construction of the Project. In all its insurance coverages
related to the Work, CONTRACTOR shall include clauses providing that each insurer
shall waive all of its rights of recovery by subrogation against OCSD, its or their
officers, agents, or employees, or any other contractor or subcontractor performing
Work or rendering services at the Project. Where permitted by law, CONTRACTOR
shall require similar written express waivers and insurance clauses from each of its
Subcontractors of every tier. A waiver of subrogation shall be effective as to any
individual or entity, even if such individual or entity (a)would otherwise have a duty
of indemnification, contractual or otherwise, (b)did not pay the insurance premium,
directly or indirectly, and (c)whether or not such individual or entity has an insurable
interest in the property damaged.
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 17 of 26
Pollution Liability Insurance: CONTRACTOR shall purchase and maintain insurance for
pollution liability covering bodily injury, property damage (including loss of use of damaged
property or property that has not been physically injured or destroyed), cleanup costs, and
defense costs (including costs and expenses for investigation, defense, or settlement of
claims). Coverage shall carry limits of at least One Million Dollars ($1,000,000) and shall
apply to sudden and non-sudden pollution conditions (including sewage spills), both at the
site or needed due to migration of pollutants from the site, resulting from the escape or
release of smoke, vapors, fumes, acids, alkalis, toxic chemicals, liquids or gases, waste
materials, or other irritants, contaminants or pollutants.
If CONTRACTOR provides coverage written on a claims-made basis, OCSD has the
right to approve or reject such coverage in its own discretion. If written on a claims-
made basis, the CONTRACTOR warrants that any retroactive date applicable to
coverage under the policy precedes the effective date of this Contract, and that
continuous coverage will be maintained, or an extended discovery period will be
exercised, for a period of two years beginning from the time that the Project under
this Contract is completed.
6. Limits are Minimums: If CONTRACTOR maintains higher limits than the minimums
shown in this Section, OCSD requires and shall be entitled to coverage for the higher
limits maintained by the CONTRACTOR.
B. Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by OCSD. At
the option of OCSD, either: the Insurer shall reduce or eliminate such deductibles or self-
insured retentions as respects OCSD, its Directors, officers, agents, CONSULTANTS, and
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 18 of 26
employees; or CONTRACTOR shall provide a financial guarantee satisfactory to OCSD
guaranteeing payment of losses and related investigations, claim administration, and
defense expenses.
C. Other Insurance Provisions
1. Each such policy of General Liability Insurance and Automobile Liability Insurance
shall be endorsed to contain, the following provisions:
a. OCSD, its Directors, officers, agents, CONSULTANTS, and employees, and all
public agencies from whom permits will be obtained, and their Directors,
officers, agents, and employees are hereby declared to be additional insureds
under the terms of this policy, but only with respect to the operations of
CONTRACTOR at or from any of the sites of OCSD in connection with this
Contract, or acts and omissions of the additional insured in connection with its
general supervision or inspection of said operations related to this Contract.
b. Insurance afforded by the additional insured endorsement shall apply as
primary insurance, and other insurance maintained by OCSD shall be excess
only and not contributing with insurance provided under this policy.
2. Each insurance policy required herein shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty(30) days prior written notice by
certified mail, return receipt requested, and that coverage shall not be cancelled for
non-payment of premium except after ten (10)days prior written notice by certified
mail, return receipt requested. Should there be changes in coverage or an increase
in deductible or SIR amounts, CONTRACTOR undertakes to procure a manuscript
endorsement from its insurer giving 30 days prior notice of such an event to OCSD,
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 19 of 26
or to have its insurance broker/agent send to OCSD a certified letter describing the
changes in coverage and any increase in deductible or SIR amounts. The certified
letter must be sent Attention: Risk Management and shall be received not less than
twenty (20) days prior to the effective date of the change(s). The letter must be
signed by a Director or Officer of the broker/agent and must be on company
letterhead, and may be sent via e-mail in pdf format.
3. Coverage shall not extend to any indemnity coverage for the active negligence of
any additional insured in any case where an agreement to indemnify the additional
insured would be invalid under California Civil Code Section 2782(b).
4. If required by a public agency from whom permit(s)will be obtained, each policy of
General Liability Insurance and Automobile Liability Insurance shall be endorsed to
specify by name the public agency and its legislative members, officers, agents,
CONSULTANTS, and employees, to be additional insureds.
D. Acceptability of Insurers
Insurers must have an "A-", or better, Policyholder's Rating, and a Financial Rating of at
least Class Vill, or better, in accordance with the most current A.M. Best Rating Guide.
OCSD recognizes that State Compensation Insurance Fund has withdrawn from
participation in the A.M. Best Rating Guide process. Nevertheless, OCSD will accept
State Compensation Insurance Fund for the required policy of worker's compensation
insurance, subject to OCSD's option, at any time during the term of this Contract, to
require a change in insurer upon twenty (20) days written notice. Further, OCSD will
require CONTRACTOR to substitute any insurer whose rating drops below the levels
herein specified. Said substitution shall occur within twenty (20)days of written notice to
CONTRACTOR by OCSD or its agent.
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 20 of 26
E. Verification of Coverage
CONTRACTOR shall furnish OCSD with original certificates and mandatory endorsements
affecting coverage. Said policies and endorsements shall conform to the requirements
herein stated. All certificates and endorsements are to be received and approved by
OCSD before Work commences. OCSD reserves the right to require complete, certified
copies of all required insurance policies, including endorsements, affecting the coverage
required by these Specifications at any time.
F. Subcontractors
CONTRACTOR shall be responsible to establish insurance requirements for any
Subcontractors hired by CONTRACTOR. The insurance shall be in amounts and types
reasonably sufficient to deal with the risk of loss involving the Subcontractor's operations
and work. OCSD and any public agency issuing permits for the Project must be named as
"Additional Insured"on any General Liability or Automobile Liability policy obtained by a
Subcontractor. The CONTRACTOR must obtain copies and maintain current versions of
all Subcontractors' policies, Certificate of Liability and mandatory endorsements effecting
coverage. Upon request, CONTRACTOR must furnish OCSD with the above referenced
required documents.
G. Required Forms and Endorsements
1. Required ACORD Form
a. Certificate of Liability Form 25
2. Required Insurance Services Office, Inc. Endorsements (when alternative forms are
shown, they are listed in order of preference)
In the event any of the following forms are cancelled by Insurance Services Office,
Inc. (ISO), or are updated, the ISO replacement form or equivalent must be supplied.
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 21 of 26
a. Commercial General Liability Form CG-0001 10 01
b. Additional Insured Including Form CG-2010 10 01 and
Products-Completed Operations Form CG-2037 10 01
C. Waiver of Transfer of Rights of Form CG-2404 11 85; or
Recovery Against Others to Us/ Form CG-2404 10 93
Waiver of Subrogation
3. Required State Compensation Insurance Fund Endorsements
a. Waiver of Subrogation Endorsement No. 2570
b. Cancellation Notice Endorsement No. 2065
4. Additional Required Endorsements
a. Notice of Policy Termination Manuscript Endorsement
5. Pollution Liability Endorsements
There shall be a Separation of Insured Clause or endorsement, providing that
coverage applies separately to each insured, except with respect to the limits of
liability. There shall also be an endorsement or policy language containing a waiver
of subrogation rights on the part of the insurer.
OCSD, its directors, officers, agents, CONSULTANTS and employees and all public
agencies from whom permits will be obtained as well as their directors, officers,
agents, and employees shall be included as insureds under the policy. Any
additional insured endorsement shall contain language at least as broad as the
coverage language contained in ISO form CG 20 10 11 85 or alternatively in both
CG 20 10 10 01 and CG 20 37 10 01 together.
SECTION-17 RISK AND INDEMNIFICATION
All Work covered by this Contract done at the site of construction or in preparing or delivering
materials to the site shall be at the risk of CONTRACTOR alone. CONTRACTOR shall save,
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 22 of 26
indemnify, defend, and keep OCSD and others harmless as more specifically set forth in
General Conditions, "General Indemnification".
SECTION-18 TERMINATION
This Contract may be terminated in whole or in part in writing by OCSD in the event of
substantial failure by the CONTRACTOR to fulfill its obligations under this Agreement, or it may
be terminated by OCSD for its convenience provided that such termination is effectuated in a
manner and upon such conditions set forth more particularly in General Conditions,
"Termination for Default" and/or"Termination for Convenience", provided that no termination
may be effected unless proper notice is provided to CONTRACTOR at the time and in the
manner provided in said General Conditions. If termination for default or convenience is
effected by OCSD, an equitable adjustment in the price provided for in this Contract shall be
made at the time and in the manner provided in the General Conditions, "Termination for
Default" and "Termination for Convenience".
SECTION—19 WARRANTY
The CONTRACTOR agrees to perform all Work under this Contract in accordance with the
Contract Documents, including OCSD's designs, Drawings and Specifications.
The CONTRACTOR guarantees for a period of at least one (1) year from the date of Final
Acceptance of the Work, pursuant to the General Conditions, "Final Acceptance and Final
Completion' that the completed Work is free from all defects due to faulty materials, equipment
or workmanship and that it shall promptly make whatever adjustments or corrections which may
be necessary to cure any defects, including repairs of any damage to other parts of the system
resulting from such defects. OCSD shall promptly give notice to the CONTRACTOR of
observed defects. In the event that the CONTRACTOR fails to make adjustments, repairs,
corrections or other work made necessary by such defects, OCSD may do so and charge the
CONTRACTOR the cost incurred. The CONTRACTOR's warranty shall continue as to any
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 23 of 26
corrected deficiency until the later of(1)the remainder of the original one-year warranty period;
or(2)one year after acceptance by OCSD of the corrected Work. The Performance Bond and
the Payment Bond shall remain in full force and effect through the guarantee period.
The CONTRACTOR's obligations under this clause are in addition to the CONTRACTOR's
other express or implied assurances under this Contract, including but not limited to specific
manufacturer or other extended warranties specified in the Plans and Specifications, or state
law and in no way diminish any other rights that OCSD may have against the CONTRACTOR
for faulty materials, equipment or Work.
SECTION-20 ASSIGNMENT
No assignment by the CONTRACTOR of this Contract or any part hereof, or of funds to be
received hereunder, will be recognized by OCSD unless such assignment has had prior written
approval and consent of OCSD and the Surety.
SECTION—21 RESOLUTION OF DISPUTES
OCSD and the CONTRACTOR shall comply with the provisions of California Public Contract
Code Section 20104 at. seq., regarding resolution of construction claims for any Claims which
arise between the CONTRACTOR and OCSD, as well as all applicable dispute and Claims
provisions as set forth in the General Conditions and as otherwise required by law.
SECTION—22 SAFETY & HEALTH
CONTRACTOR shall comply with all applicable safety and health requirements mandated by
federal, state, city and/or public agency codes, permits, ordinances, regulations, and laws, as
well as these Contract Documents, including but not limited to the General Requirements,
Section entitled "Safety" and Exhibit B OCSD Safety Standards.
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 24 of 26
SECTION-23 NOTICES
Any notice required or permitted under this Contract may be given by ordinary mail at the
address set forth below. Any party whose address changes shall notify the other party in
writing.
TO OCSD: Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Attn: Clerk of the Board
Copy to: Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Attn: Construction Manager
Bradley R. Hogin, Esquire
Woodruff, Spradlin &Smart
555 Anton Boulevard
Suite 1200
Costa Mesa, California 92626
TO CONTRACTOR: CDC Engineering and Technology
5675 Walnut Ridge Drive
Agoura, CA 91301
Copy to: Oved Dagan, President
ODC Engineering and Technology
5675 Walnut Ridge Drive
Agoura, CA 91301
CONFORMED C-CA-011317
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8AND AREA PAVING
Page 25 of 26
IN WITNESS WHEREOF, the parties hereto have executed this Contract Agreement as the
date first hereinabove written.
CONTRACTOR: ODC Engineering and Technology
5675 Walnut Ridge Drive
Agoura, CA 91301
By
Printed Name
Its
CONTRACTOR's State License No. 822239 (Expiration Date—07/31/2017)
OCSD: Orange County Sanitation District
By
Gregory C. Sebourn, PLS
Chair, Board of Directors
By
Kelly A. Lore
Clerk of the Board
By
Marc Dubois
Contracts, Purchasing and Materials
Management Manager
C-CA-011317 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 26 of 26
EXHIBIT A
SCHEDULE OF PRICES
C-EXA-080414
TABLE OF CONTENTS
EXHIBIT A
SCHEDULE OF PRICES
EXA-1 BASIS OF COMPENSATION.............................................................................1
EXA-2 PROGRESS PAYMENTS ..................................................................................1
EXA-3 RETENTION AND ESCROW ACCOUNTS........................................................1
EXA-4 STOP PAYMENT NOTICE.................................................................................3
EXA-5 PAYMENT TO SUBCONTRACTORS................................................................3
EXA-6 PAYMENT OF TAXES .......................................................................................3
EXA-7 FINAL PAYMENT...............................................................................................4
EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT...5
ATTACHMENT 1 -CERTIFICATION FOR REQUEST FOR PAYMENT.........................7
ATTACHMENT 2-SCHEDULE OF PRICES...................................................................8
C-EXA-080414
EXHIBIT A
SCHEDULE OF PRICES
EXA-1 BASIS OF COMPENSATION
CONTRACTOR will be paid the Contract Price according to the Schedule of
Prices, and all other applicable terms and conditions of the Contract
Documents.
EXA-2 PROGRESSPAYMENTS
Progress payments will be made in accordance with all applicable terms and
conditions of the Contract Documents, including, but not limited to:
1. Contract Agreement—Section 11 —"Contract Price and Method of
Payment;"
2. General Conditions—"Payment—General";
3. General Conditions—"Payment—Applications for Payment';
4. General Conditions—"Payment— Mobilization Payment Requirements;"
5. General Conditions—"Payment— Itemized Breakdown of Contract Lump
Sum Prices";
6. General Conditions—"Contract Price Adjustments and Payments";
7. General Conditions—"Suspension of Payments";
8. General Conditions—"OCSD's Right to Withhold Certain Amounts and
Make Application Thereof"; and
9. General Conditions—"Final Payment."
EXA-3 RETENTION AND ESCROW ACCOUNTS
A. Retention:
OCSD shall retain a percentage of each progress payment to assure
satisfactory completion of the Work. The amount to be retained from each
progress payment shall be determined as provided in General Conditions—
"Retained Funds; Substitution of Securities". In all contracts between
CONTRACTOR and its Subcontractors and/or Suppliers, the retention may not
exceed the percentage specified in the Contract Documents.
CONFORMED C-EXA-080414
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 1 of 8
B. Substitution of Securities:
CONTRACTOR may, at its sole expense, substitute securities as provided in
General Conditions—"Retained Funds; Substitution of Securities' Payment of
Escrow Agent:
In lieu of substitution of securities as provided above, the CONTRACTOR may
request and OCSD shall make payment of retention earned directly to the
escrow agent at the expense of the CONTRACTOR. At the expense of the
CONTRACTOR, the CONTRACTOR may direct the investment of the
payments into securities consistent with Government Code §16430 and the
CONTRACTOR shall receive the interest earned on the investments upon the
same terms provided for in this article for securities deposited by the
CONTRACTOR. Upon satisfactory completion of the Contract, the
CONTRACTOR shall receive from the escrow agent all securities, interest and
payments received by the escrow agent from OCSD, pursuant to the terms of
this article. The CONTRACTOR shall pay to each Subcontractor, not later than
twenty (20)calendar days after receipt of the payment, the respective amount
of interest earned, net of costs attributed to retention withheld from each
Subcontractor, on the amount of retention withheld to ensure the performance
of the Subcontractor. The escrow agreement used by the escrow agent
pursuant to this article shall be substantially similar to the form set forth in
§22300 of the California Public Contract Code.
C. Release of Retention:
Upon Final Acceptance of the Work, the CONTRACTOR shall submit an
invoice for release of retention in accordance with the terms of the Contract.
D. Additional Deductibles:
In addition to the retentions described above, OCSD may deduct from each
progress payment any or all of the following:
1. Liquidated Damages that have occurred as of the date of the application for
progress payment;
2. Deductions from previous progress payments already paid, due to OCSD's
discovery of deficiencies in the Work or non-compliance with the
Specifications or any other requirement of the Contract;
3. Sums expended by OCSD in performing any of the CONTRACTOR'S
obligations under the Contract that the CONTRACTOR has failed to
perform, and;
4. Other sums that OCSD is entitled to recover from the CONTRACTOR
under the terms of the Contract, including without limitation insurance
deductibles and assessments.
C-EXA-080414 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8 AND AREA PAVING
Page 2 of 8
The failure of OCSD to deduct any of the above-identified sums from a
progress payment shall not constitute a waiver of OCSD's right to such sums or
to deduct them from a later progress payment.
EXA-4 STOP PAYMENT NOTICE
In addition to other amounts properly withheld under this article or under other
provisions of the Contract, OCSD shall retain from progress payments
otherwise due the CONTRACTOR an amount equal to one hundred twenty-five
percent (125%)of the amount claimed under any stop payment notice under
Civil Code§9350 at. seq. or other lien filed against the CONTRACTOR for
labor, materials, supplies, equipment, and any other thing of value claimed to
have been furnished to and/or incorporated into the Work; or for any other
alleged contribution thereto. In addition to the foregoing and in accordance with
Civil Code§9358 OCSD may also satisfy its duty to withhold funds for stop
payment notices by refusing to release funds held in escrow pursuant to public
receipt of a release of stop payment notice executed by a stop payment notice
claimant, a stop payment notice release bond, an order of a court of competent
jurisdiction, or other evidence satisfactory to OCSD that the CONTRACTOR
has resolved such claim by settlement.
EXA-5 PAYMENT TO SUBCONTRACTORS
Requirements
1. The CONTRACTOR shall pay all Subcontractors for and on account of
Work performed by such Subcontractors, not later than seven (7) days after
receipt of each progress payment as required by the California Business
and Professions Code §7108.5. Such payments to Subcontractors shall be
based on the measurements and estimates made pursuant to article
progress payments provided herein.
2. Except as specifically provided by law, the CONTRACTOR shall pay all
Subcontractors any and all retention due and owing for and on account of
Work performed by such Subcontractors not later than seven (7)days after
CONTRACTOR'S receipt of said retention proceeds from OCSD as
required by the California Public Contract Code§7107.
EXA-6 PAYMENT OF TAXES
Unless otherwise specifically provided in this Contract, the Contract Price
includes full compensation to the CONTRACTOR for all taxes. The
CONTRACTOR shall pay all federal, state, and local taxes, and duties
applicable to and assessable against any Work, including but not limited to
retail sales and use, transportation, export, import, business, and special taxes.
The CONTRACTOR shall ascertain and pay the taxes when due. The
CONTRACTOR will maintain auditable records, subject to OCSD reviews,
confirming that tax payments are current at all times.
CONFORMED C-EXA-080414
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 3 of 8
EXA-7 FINAL PAYMENT
After Final Acceptance of the Work, as more particularly set forth in the
General Conditions, "Final Acceptance and Final Completion", and after
Resolution of the Board authorizing final payment and satisfaction of the
requirements as more particularly set forth in General Conditions—"Final
Payment", a final payment will be made as follows:
1. Prior to Final Acceptance, the CONTRACTOR shall prepare and submit an
application for Final Payment to OCSD, including:
a. The proposed total amount due the CONTRACTOR, segregated by
items on the payment schedule, amendments, Change Orders, and
other bases for payment;
b. Deductions for prior progress payments;
c. Amounts retained;
d. A conditional waiver and release on final payment for each
Subcontractor(per Civil Code Section 8136);
e. A conditional waiver and release on final payment on behalf of the
CONTRACTOR (per Civil Code Section 8136);
f. List of Claims the CONTRACTOR intends to file at that time or a
statement that no Claims will be filed,
g. List of pending unsettled claims, stating claimed amounts, and copies of
any and all complaints and/or demands for arbitration received by the
CONTRACTOR; and
h. For each and every claim that resulted in litigation or arbitration which
the CONTRACTOR has settled, a conformed copy of the Request for
Dismissal with prejudice or other satisfactory evidence the arbitration is
resolved.
2. The application for Final Payment shall include complete and legally
effective releases or waivers of liens and stop payment notices satisfactory
to OCSD, arising out of or filed in connection with the Work. Prior progress
payments shall be subject to correction in OCSD's review of the application
for Final Payment. Claims filed with the application for Final Payment must
be otherwise timely under the Contract and applicable law.
3. Within a reasonable time, OCSD will review the CONTRACTOR'S
application for Final Payment. Any recommended changes or corrections
will then be forwarded to the CONTRACTOR. Within ten (10) calendar days
after receipt of recommended changes from OCSD, the CONTRACTOR will
make the changes, or list Claims that will be filed as a result of the
changes, and shall submit the revised application for Final Payment. Upon
C-EXA-080414 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8 AND AREA PAVING
Page 4 of 8
acceptance by OCSD, the revised application for Final Payment will
become the approved application for Final Payment.
4. If no Claims have been filed with the initial or any revised application for
Final Payment, and no Claims remain unsettled within thirty-five (35)
calendar days after Final Acceptance of the Work by OCSD, and
agreements are reached on all issues regarding the application for Final
Payment, OCSD, in exchange for an executed release, satisfactory in form
and substance to OCSD, will pay the entire sum found due on the approved
application for Final Payment, including the amount, if any, allowed on
settled Claims.
5. The release from the CONTRACTOR shall be from any and all Claims
arising under the Contract, except for Claims that with the concurrence of
OCSD are specifically reserved, and shall release and waive all unreserved
Claims against OCSD and its officers, directors, employees and authorized
representatives. The release shall be accompanied by a certification by the
CONTRACTOR that:
a. It has resolved all Subcontractors, Suppliers and other Claims that are
related to the settled Claims included in the Final Payment;
b. It has no reason to believe that any party has a valid claim against the
CONTRACTOR or OCSD which has not been communicated in writing
by the CONTRACTOR to OCSD as of the date of the certificate;
c. All warranties are in full force and effect, and;
d. The releases and the warranties shall survive Final Payment.
6. If any claims remain open, OCSD may make Final Payment subject to
resolution of those claims. OCSD may withhold from the Final Payment an
amount not to exceed one hundred fifty percent (150%) of the sum of the
amounts of the open claims, and one hundred twenty-five percent (125%)
of the amounts of open stop payment notices referred to in article entitled
stop payment notices herein.
7. The CONTRACTOR shall provide an unconditional waiver and release on
final payment from each Subcontractor and Supplier providing Work under
the Contract(per Civil Code Section 8138) and an unconditional waiver and
release on final payment on behalf of the CONTRACTOR (per Civil Code
Section 8138)within thirty (30)days of receipt of Final Payment.
EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT
Notwithstanding OCSD's acceptance of the application for Final Payment and
irrespective of whether it is before or after Final Payment has been made,
OCSD shall not be precluded from subsequently showing that:
1. The true and correct amount payable for the Work is different from that
previously accepted;
CONFORMED C-EXA-080414
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 5 of 8
2. The previously-accepted Work did not in fact conform to the Contract
requirements, or;
3. A previous payment or portion thereof for Work was improperly made.
OCSD also shall not be stopped from demanding and recovering damages
from the CONTRACTOR, as appropriate, under any of the foregoing
circumstances as permitted under the Contract or applicable law.
C-EXA-080414 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8 AND AREA PAVING
Page 6 of 8
ATTACHMENT 1 —CERTIFICATION FOR REQUEST FOR PAYMENT
I hereby certify under penalty of perjury as follows:
That the claim for payment is in all respects true, correct; that the services mentioned
herein were actually rendered and/or supplies delivered to OCSD in accordance with the
Contract.
I understand that it is a violation of both the federal and California False Claims Acts to
knowingly present or cause to be presented to OCSD a false claim for payment or
approval.
A claim includes a demand or request for money. It is also a violation of the False
Claims Acts to knowingly make use of a false record or statement to get a false claim
paid. The term "knowingly" includes either actual knowledge of the information,
deliberate ignorance of the truth or falsity of the information, or reckless disregard for the
truth or falsity of the information. Proof of specific intent to defraud is not necessary
under the False Claims Acts. I understand that the penalties under the Federal False
Claims Act and State of California False Claims Act are non-exclusive, and are in
addition to any other remedies which OCSD may have either under contract or law.
I hereby further certify, to the best of my knowledge and belief, that:
1. The amounts requested are only for performance in accordance with the
Specifications, terms, and conditions of the Contract;
2. Payments to Subcontractors and Suppliers have been made from previous payments
received under the Contract, and timely payments will be made from the proceeds of
the payment covered by this certification;
3. This request for progress payments does not include any amounts which the prime
CONTRACTOR intends to withhold or retain from a Subcontractor or Supplier in
accordance with the terms and conditions of the subcontract; and
4. This certification is not to be construed as Final Acceptance of a Subcontractor's
performance.
Name
Title
Date
CONFORMED C-EXA-080414
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING, BUILDING 8 AND AREA PAVING
Page 7 of 8
ATTACHMENT 2—SCHEDULE OF PRICES
See next pages from the Bid Submittal Forms (ODC Engineering and Technology)
BF-14 Schedule of Prices, Pages 1-4
C-EXA-080414 CONFORMED
CONTRACT NO. P1-115B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8 AND AREA PAVING
Page 8 of 8
DOC EWM%RING 8 7ECMi*LOGY
Bid Submitted By:
(Nam of Firm)
BF-14 SCHEDULE OF PRICES
INSTRUCTIONS
A. General
For Unit Prices, it is understood that the following quantifies are approximate only and are
solely for the purpose of estimating the comparison of Bids, and that the actual value of Work
will be computed based upon the actual quantities in the completed Work,whether they be
more or less than those shown. CONTRACTOR'S compensation for the Work under the
Contract Documents will be computed based upon the lump sum amount of the Contract at
time of award, plus any additional or deleted costs approved by OCSD via approved Change
Orders,pursuant to the Contract Documents.
Bidder shall separately price and accurately reflect costs associated with each line item,
leaving no blanks. Any and all modifications to the Bid must be initialed by an authorized
representative of the Bidder in accordance with the Instructions to Bidders, Preparation of Bid.
Bidders are reminded of Instruction to Bidders, Discrepancy in Bid Items, which, in summary,
provides that the total price for each item shall be based on the Unit Price listed for each item
multiplied by the quantity; and the correct Total Price for each item shall be totaled to
determine the Total Amount of Bid.
All applicable costs including overhead and profit shall be reflected in the respective unit costs
and the TOTAL AMOUNT OF BID. The Bid price shall include all costs to complete the Work,
including profit overhead etc unless otherwise specified in the Contract Documents All
applicable sales taxes state and/or federal and any other special taxes patent rights or
royalties shall be included in the prices quoted in this Bid.
B. Basis of Award
AWARD OF THE CONTRACT WILL BE MADE ON THE BASIS OF THE LOWEST
RESPONSIVE AND RESPONSIBLE BID, THE LOWEST BID IS DEFINED AS THE"TOTAL
AMOUNT OF BID" LISTED IN THIS BID, UNLESS OTHERWISE SPECIFIED BELOW.
Note 1: Base Bid. Includes all costs necessary to furnish all labor, materials, equipment and
services for the construction of the Project per the Contract Documents.
Bidders shall accurately reflect the cost to perform the Work. OCSD may reject unbalanced
Bids. Refer to Part 2—INSTRUCTIONS TO BIDDERS.
BF-14 SCHEDULE OF PRICES C-BF-021115
CONTRACT NO. PIA 15B
REHABILITATION OF FLEET SERVICES BUILDING,BUILDING 8 AND AREA PAVING
Page 1 of 4
\ f \ \ V )7q
dOZ° 2§;
m
0\
� \ \
# \
no
AS .
- ! —
« , —
_
w \ m � k
/) ) { q (/ !
• v! ! $ /f \ ° `
{� \)0 aE $ |!
— : E — k \cc 0 / a
{)� a
/ \E,A )) /)}k/)) « ! 9
k k!
\ \ k\ kk � [ M0 !0
) ) / k/) {} 0 �) k �
kk {\
_
-
16
/ \ \\\
6§§
j0 00
-
% ( /
§ &
§
7 ƒ = ! k ! : `
\ \ {\ { / \o
| 222f § | ` 2
MW
` G \ �2 )j\
! § 2 ! ! IA |
(/\ k M )« � �
f § E! E , {,
5
(k0
2 \ /\\
\ (\t! ■ ! /! Fn Lx E
16
\ 0 ! E ) \f)7 _
= } // \ a k \ / = :
\ } Lo OM\\ O � w {w 0 )
|! a « \
�kp > \
(f
§ ` \ 2°
} ° #
§ (
\ E _ \
m IR � ! e \ § &
\ S : S}/D \
§ � E - -
| e., ■
e , | ze
k tkkWg
! | ) § kk
! f£ ! WE
dE
J tE \\ !
! F20z
! w; O
£ ! $ m \
| { ! E <§ §
■ § Ole<
OPERATIONS COMMITTEE Meeting Date To ad.of Dir.
0705,17
-
AGENDA REPORT em Number Iem Number
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Director of Engineering
SUBJECT: LANE CHANNEL CROSSING PROJECT, PROJECT NO. FE16-11
GENERAL MANAGER'S RECOMMENDATION
Information Only.
BACKGROUND
The Orange County Sanitation District (Sanitation District) owns and maintains the
Von Karmen Trunk Sewer, including a 36-inch sewer inside a concrete encasement under
the Orange County Flood Control District's (OCFCD) Lane Channel. In addition, the
Sanitation District has two manholes on the channel levees. This section of sewer is
located at the intersection of Von Karman Avenue and the Interstate 405 freeway in the
City of Irvine. In 1965, the County of Orange received a dedicated easement from a
private party who maintains land ownership. In 1957, the Sanitation District obtained a
permanent encroachment permit with the County of Orange.
RELEVANT STANDARDS
• Maintain collaborative and cooperative relationships with neighboring agencies
• Operate and maintain facilities to minimize impacts on surrounding communities,
including odor, noise, and lighting
• Less than 2.1 sewer spills per 100 miles
PROBLEM
Lane Channel has significant erosion in the vicinity of the Sanitation District's Von Karmen
Trunk sewer. OCFCD is leading a project to restore and improve the condition of Lane
Channel (Restoration Project) and the Sanitation District's sewer is within the restoration
area. If not properly protected from heavy earth-moving equipment, OCFCD's
construction activities could adversely affect the Sanitation District sewer and manholes.
PROPOSED SOLUTION
The Sanitation District and OCFCD are working cooperatively with urgency to restore the
channel while preserving the Sanitation District's Von Karman Trunk Sewer. The
Sanitation District has agreed to provide engineered drawings to OCFCD to protect the
sewer that will be incorporated into OCFCD's plans and specifications. After the
engineered drawings are complete, cost estimates will be used to create a reimbursement
agreement between OCFCD and the Sanitation District to implement the sewer protection
Page 1 of 4
as a part of OCFCD's project. The Sanitation District will bear the cost to protect its
sewer.
TIMING CONCERNS
The Sanitation District would like Lane Channel restored as soon as possible to reduce
the erosion risk to the sewer and manholes. OCFCD intends to bid the Restoration
Project in late October 2017 and award the contract in February 2018.
RAMIFICATIONS OF NOT TAKING ACTION
Without a sewer protection plan design, the OCFCD Restoration Project will be further
delayed.
PRIOR COMMITTEE/BOARD ACTIONS
On June 28, 2017, the Sanitation District Board of Directors approved a Sole Source
Professional Design and Construction Support Services Agreement with HDR
Engineering, Inc. to provide engineering services for Lane Channel Crossing Project,
Project No. FE16-11, for an amount not to exceed $131,939; and a contingency of
$13,194 (10%) provided that an informational item be presented to the July 2017
Operations Committee.
ADDITIONAL INFORMATION
In 2015, the Sanitation District became aware of erosion in Lane Channel and took steps
to reduce risk for the Sanitation District in the event of further erosion prior to
implementation of the OCFCD Restoration Project.
As part of the Restoration Project, OCFCD will increase the level of flood protection for
the residents and businesses within the flood plain by reducing or eliminating potential for
personal injury and property damage due to flooding. The project goal is to improve this
flood control channel reach and stop eroding sediment from the channel slopes from
entering the San Diego Creek Channel. The channel has severely eroded over the years
and poses a danger to adjacent office buildings, the Interstate 405 freeway, and
northbound Interstate 405 at the MacArthur Boulevard off-ramp.
OCFCD permitted the Sanitation District to install, operate, and maintain the Von Karman
Trunk Sewer within the OCFCD's channel in 1987. As a condition of the permit, OCFCD
stipulated that the Sanitation District relocate the sewer upon written notice and do so at
its expense, when necessary for the construction, reconstruction, improvement, or
alteration of the OCFCD's works. The sewer line is in conflict with the Restoration Project
and OCFCD has requested the Sanitation District either relocate the sewer line or provide
protection plans for the sewer during the Restoration Project construction. In lieu of
relocating the sewer, the Sanitation District has agreed to fund the protection plan
preparation and implementation.
Page 2 d 4
In December 2016, OCFCD notified the Sanitation District to relocate its sewer or provide
a protection plan; however, the Sanitation District could not procure an engineering
consultant to prepare the protection plan to meet the OCFCD schedule. It was agreed to
have the Sanitation District reimburse OCFCD for consultant services.
HDR began work under contract with OCFCD in February 2017 and completed a sewer
protection plan for the OCFCD Restoration Project on behalf of the Sanitation District.
HDR completed the design work and incorporated OCFCD comments in March 2017. In
late April 2017, OCFCD's design consultant (Geosyntec) for the Lane Channel
Restoration Project required a higher level of protection for the Sanitation District sewer
that required HDR to redesign the sewer protection plan. The Sanitation District, in
consultation with OCFCD, decided to contract with HDR directly through a sole source
contract and requested a proposal in May 2017.
Review of Fee Proposal and Negotiations:
A proposal was submitted by HDR on June 1, 2017 and staff negotiated to clarify the
requirements of the scope of work, the assumptions used for the estimated level of effort,
and the proposed approach to meet the goals and objectives for the project.
Original Proposal Negotiated
Work Completed to Date $35,600 $35,600
Total Hours 576 529
Total Fee $136,585 $131,939
Based on the above, staff determined that the final negotiated fee was fair and reasonable
for the level of effort required for this project and recommended award of the Professional
Design and Construction Support Services Agreement to HDR.
The negotiated fee of $131,939 includes $35,600 for the initial design work while under
contract with OCFCD, $70,604 for the remaining design work, and $25,735 for
construction support services.
Anticipated Future Actions
When the new design is complete in July 2017, a cost estimate to protect the Von Kerman
Trunk Sewer will be generated. This estimated cost will be incorporated into a
reimbursement agreement with OCFCD. It is anticipated that this reimbursement
agreement will be brought to the Board of Directors for approval in August 2017. Staff
recommends taking this item directly to the Board of Directors in August 2017 since the
Operations Committee is not scheduled to meet in August.
CEQA
OCFCD is the lead agency and has determined the project to be categorically exempt.
Page 3 of 4
FINANCIAL CONSIDERATIONS
This item has been budgeted and the budget is sufficient for the recommended action.
FY Budget 2017-18, Appendix Page A-7.
Date of Approval Contract Amount Contingency
06/28/2017 $131,939 $13,194
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.coml with the
complete agenda package:
N/A
CD:sa:gc
Page 4 of 4
OPERATIONS COMMITTEE Meeting Date To ad.of Dir.
0705,17
-
AGENDA REPORT IWm Number Item Number
z -
Orange County Sanitation District
FROM: James D. Herberg, General Manager
Originator: Ed Torres, Director of Operations and Maintenance
SUBJECT: PLANT NO. 1 PRIMARY CLARIFIER REHABILITATION
GENERAL MANAGER'S RECOMMENDATION
Information Only.
BACKGROUND
The primary clarifiers are the work horse of the wastewater treatment process and are
critical to our ability to meet both effluent treatment standards and provide quality water
to the Orange County Water District (OCWD) for reclamation. Recently, we have
experienced breakdowns impacting five of our primary clarifiers, which affects our ability
to process wastewater efficiently. Due to the significant level of effort involved and time
sensitivity, this work would be best handled through a contractor on an immediate basis.
RELEVANT STANDARDS
• 24/7/365 treatment plant reliability
• Meet volume and water quality needs to support GW RS System
• Maintain a proactive asset management program
PROBLEM
All influent wastewater must go through primary treatment. Due to recent failures of five
primary clarifiers and the worsening condition of an additional five primary clarifiers at
Plant No. 1, we are at risk of having to divert flow from Plant No. 1 to Plant No. 2, which
would place us at a higher risk during the wet weather season, as well as reduce the
amount of flow available to the Groundwater Replenishment System (GWRS).
PROPOSED SOLUTION
It was proposed to proceed with urgent mechanical rehabilitation and overhaul of 10
primary clarifiers at Plant No. 1 as an emergency procurement in accordance with Section
1.07B of the Purchasing Ordinance No. OCSD-47, "critical and time sensitive
procurement", where time is of the essence and the Orange County Sanitation District
(Sanitation District) does not have sufficient time to solicit bids or proposals.
Page 1 of 2
TIMING CONCERNS
This project is time sensitive due to the upcoming wet weather season, which is predicted
to be an "El Nino' year, and our partnership with OCWD to produce 100 mgd of indirect
potable water. This action will speed up the process by approximately four months, as
opposed to the normal Request for Proposal process. This will help us to complete these
activities before the wet weather season and minimize the impact to GWRS.
RAMIFICATIONS OF NOT TAKING ACTION
Failure to take action may impact our readiness to treat severe storm flows during the
upcoming wet weather season, as well as our ability to supply the desired quantity of
effluent water to the GWRS.
PRIOR COMMITTEE/BOARD ACTIONS
On June 28, 2017, the Board of Directors approved a Purchase Order to Frost Company
for the mechanical rehabilitation and overhaul of 10 Primary Clarifiers at Plant No. 1, in
accordance with Section 1.07B of the Purchasing Ordinance No. OCSD-47,for a total not
to exceed $385,000, plus applicable tax; and a contingency amount of $77,000 (20%)
provided that an informational item be presented to the July 2017 Operations Committee.
ADDITIONAL INFORMATION
Frost Company was selected to serve the urgent primary clarifier rehabilitation needs of
the Sanitation District due to their qualifications and experience servicing the mechanical
systems of our primary clarifiers. Frost Company has successfully demonstrated their
ability to provide emergency mechanical type support to the Sanitation District, on both
the primary clarifiers at Plant No. 1 and truck loading facility at Plant No. 2.
FINANCIAL CONSIDERATIONS
This request complies with authority levels of the Sanitation District's Purchasing
Ordinance. This item has been budgeted in the Division 870 budget (Line Item: Repairs
and Maintenance, Section 6, Page 92). Project contingency funds will not be used for
this contract.
Date of Approval Contract Amount Contingency
06/28/2017 $385,000 $77,000 (20%)
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.coml with the
complete agenda package:
N/A
Page 2 of 2