HomeMy WebLinkAboutOCSD 03-14t ....... RESOLUTION NO. OCSD 03-14 DECLARATION OF OFFICIAL INTENT TO REIMBURSE CERTAIN OF THE DISTRICT'S CAPITAL RESERVE FUNDS FOR EXPENDITURES MADE IN ADVANCE FOR FISCAL YEAR 2003-04 CAPITAL IMPROVEMENT PROJECTS FROM PROCEEDS OF A FUTURE LONG-TERM FINANCING A RESOLUTION OF THE BOARD OF DIRECTORS OF ORANGE COUNTY SANITATION DISTRICT AUTHORIZING FUTURE CAPITAL EXPENDITURES TO BE REIMBURSED FROM FUTURE LONG-TERM FINANCING WHEREAS, the Board of Directors, by adoption of Resolution No. 94-81 on July 13, 1994; Resolution No. 97-28 on July 30, 1997; Resolution No. OCSD 98-32 on July 1, 1998; Resolution No. OCSD 99-08 on June 23, 1999; Resolution No. 00-15 on July 19, 2000, Resolution No. OCSD 01-17 on August 22, 2001, and Resolution No. OCSD 02-20 on October 23, 2002, previously declared its official intent to reimburse its then existing capital reserve funds and accounts for certain expenditures made in advance of and in anticipation of issuing indebtedness for capital improvements to be acquired, constructed, or paid for, by or on behalf of the District during the Fiscal Year; and, WHEREAS, the District ("Issuer") intends to acquire and/or construct, or otherwise improve, certain capital improvements during Fiscal Year 2003-04, and later, all as more particularly described on Exhibit "A", attached hereto and incorporated herein by reference (the "Project"); and, WHEREAS, Issuer expects to pay certain expenditures (the "Reimbursement Expenditures") in connection with the Project prior to the issuance of indebtedness for the purpose of financing costs associated with the Project, on a long-term basis; and, WHEREAS, the Issuer reasonably expects that the debt obligations, in an amount not to exceed $300 million, will be issued, and that certain of the proceeds of such debt obligations will be used to reimburse the Issuer for Reimbursement Expenditures. NOW, THEREFORE, the Board of Directors of Orange County Sanitation District, DOES HEREBY RESOLVE, DETERMINE AND ORDER: 1 ., Section 1: That the Issuer finds and determines that the foregoing Recitals are true and correct. Section 2: That this Declaration is made solely for purposes of establishing compliance with the requirements of Section 1.150-2 of the U.S. Treasury Regulations. This Resolution Declaration does not bind the Issuer to make any expenditure, incur any indebtedness, or proceed with the Project. Section 3: That the Issuer hereby declares its official intent to use proceeds of indebtedness to reimburse itself for the Reimbursement Expenditures. PASSED AND ADOPTED at a regular meeting of the ~~ar:9 pf ~irectors held June 25, 2003. · '---_ -" -. .-,· ATT~T: <-r::&r;/j.~it· ;fr .. &1- Board Sec~tary o FAHR2003\0603 , ,!'" • ·. , ~~-., r",, ~:· J ~e~_-.. . Chair # ;--_, f . ,.-.· · •• • ~· •. J. \. ...\. .• 2 ~ ' .. ) } ".'. -~ \ Exhibit A Summary of Validated Capital Improvement Program 2003-04 Budget Total Est. Cost 2003-04 Project Project to Date Cashflow Future Number Budget 6/30/03 Budget Budget Collections Greenville Sullivan /Raitt Street Manhole Rehab. 01-100 3,269,000 3,269,000 Santa Ana Trunk Sewer Rehab. 01-17 14,638,000 407,000 14,231,000 Lower Main-Broadway MH Rehabilitation 01-22 1,467,000 1,467,000 Continuous Feed Chemical Treatment Facility 01-96 451,000 312,000 139,000 Trunk Sewer Mapping Project 01-98 2,013,000 1,111,000 900,000 2,000 Carbon Cnyn Sewer and Pump Sin. Abandonment 02-24-1 3,467,000 469,000 1,983,000 1,015,000 Santa Ana River Interceptor Relief Sewer 02-31 17,272,000 276,000 16,996,000 Santa Ana River Interceptor Realignment and Pro!. 02-41 63,620,000 2,251,000 4,183,000 57,186,000 Abandonment of the existing SARI in SA River 02-41-01 8,456,000 8,456,000 Aband. of Yorba Linda Pump Station 02-42 955,000 955,000 Taft Branch Improvements 02-49 3,508,000 9,000 3,499,000 Atwood Subtrunk Improvements 02-50 3,187,000 110,000 3,077,000 Lower Santa Ana River Interceptor Improvements 02-51 35,012,000 35,012,000 Euclid Relief Improvements -Reach "A" 02-52 20,856,000 14,000 20,842,000 Euclid Relief Improvements -Reach "B" 02-53 10,319,000 10,319,000 Santa Ana River Relief Sewer, Reach B 02-58 32,702,000 32,702,000 Newhope-Placentia & Cypress Trunk Replacements 02-65 28,785,000 28,785,000 Upper & Lower Newhope-Placentia MH Rehabilitation 02-66 4,351,000 4,351,000 SARI and South Anaheim Interceptor MH Rehab. 02-67 3,087,000 3,087,000 Rehabilitation of Magnolia Trunk Sewer 03-35-R2 48,868,000 7,896,000 40,972,000 Trask Branch of the Hoover-Western Subtrunk 03-45 1,410,000 1,410,000 Rehabilitation of the Westside Pump Station 03-52 2,991,000 206,000 236,000 2,549,000 Westside Relief Interceptor/ Los Alamitos MH Rehab 03-55 17,136,000 17,136,000 Rehabilitation of the Seal Beach and Edinger PS 03-56 8,574,000 8,574,000 Lining of 36" NPTB FM (June. Box to 2nd Angle Pt.) 05-29-R1 1,996,000 1,440,000 517,000 39,000 Replacement of Back Bay Trunk Sewer 05-46 7, 189,000 6,489,000 357,000 343,000 Balboa Trunk Sewer Rehabilitation 05-47 5,759,000 5,759,000 Replacement of the Bitter Point Pump Station 05-49 8, 159,000 347,000 1,515,000 6,297,000 Replacement of the Rocky Point Pump Station 05-50 9,362,000 195,000 1,000,000 8,167,000 Rehabilitation of the 14th Street Pump Station 05-51 4,617,000 819,000 190,000 3,608,000 Rehabilitation of the "A" Street Pump Station 05-52 5,013,000 1,244,000 281,000 3,488,000 Rehabilitation of the Bay Bridge Pump Station 05-53 2,612,000 149,000 2,463,000 Rehabilitation of the Crystal Cove Pump Station 05-54 1,512,000 157,000 248,000 1,107,000 Exhibit A Summary of Validated Capital Improvement Program 2003-04 Budget Total Est. Cost 2003-04 Project Project to Date Cashflow Future Number Budget 6/30/03 Budget Budget PCH FM Bitter Pt Ps To Coast Trunk @ B hurst & PCH 05-58 13,927,000 35,000 260,000 13,632,000 Big Canyon Trunk Sewer Rehab & Replacement 05-59 2,534,000 121,000 804,000 1,609,000 Aband. of AB Trunk, Watson and Cal. Sewers 06-13 351,000 296,000 55,000 Abandonment of Airbase Trunk Sewer -California St 06-13-3 975,000 7,000 948,000 20,000 Abandonment of Airbase Trunk (Watson St) & College 06-16 3,276,000 143,000 3,110,000 23,000 Covey Lane Pump Station Abandonment 07-14-04 153,000 93,000 60,000 Sunflower Interceptor Manhole Rehab. 07-21 3,991,000 569,000 447,000 2,975,000 Gisler Red Hill Trunk Sewer Relocation -Phase 1 07-32-1 936,000 145,000 791,000 Gisler-Redhill System Improvements, Reach B 07-37 6,893,000 213,000 337,000 6,343,000 Replacement of the College Ave. Pump Station 07-47 6,021,000 212,000 5,809,000 Rehabilitation of the MacArthur Pump Station 07-49 2,355,000 84,000 2,271,000 Tustin West/Lemon Heights Trunk Improvements 07-56 5,926,000 25,000 48,000 5,853,000 Lower Gisler-Redhill Trunk Relocation and MH Rehab 07-57 6,615,000 16,000 6,599,000 Gisler Redhill Trunk lmprov. & Orange Trunk lmprov 07-58 23,561,000 1,675,000 2,163,000 19,723,000 Upper Gisler-Redhill MH Rehabilitation & Campus Dr 07-59 2, 121,000 2,121,000 Modifications to the Main Street Pump Station 07-7-2 969,000 126,000 843,000 Newland Street Interceptor Sewer Protection 11-14-R 127,000 15,000 112,000 Warner Avenue Relief Sewer 11-22 7,480,000 646,000 2,222,000 4,612,000 Edinger/Bolsa Chica Trunk Improvements 11-25 2,126,000 2,126,000 Coast Trunk Sewer Rehabilitation 11-26 16,635,000 56,000 16,579,000 Facilities Engineering Projects -Collections FE-Collect 5,400,000 317,000 5,083,000 Bushard Trunk Sewer Rehabilitation 1-2-4 39,393,000 7,831,000 11,999,000 19,563,000 Pump Station P&IDs and Equipment Tagging SP-95 720,000 720,000 Total Collections System 535,098,000 35,400,000 36,664,000 463,034,000 Collections Facilities Rehabilitate District Siphons By Adding Air Jumper 02-68 5,731,000 106,000 5,625,000 Replacement of the Ellis Ave. Pump Sin 1-10 33,837,000 817,000 1,999,000 31,021 000 Collections Facilities Total 39,568,000 817,000 2,105,000 36,646,000 Headworks PLC Programming and Integration J-83 515,000 122,000 393,000 Sunflower Drive Replacement P1-62 815,000 728,000 87,000 Headworks Rehabilitation/Refurbishment P1-71 37,510,000 72,000 37,438,000 Headworks Improvements at Plant No. 2 P2-66 226, 130,000 7,716,000 4,561,000 213,853,000 Headworks Total 264,970,000 8,638,000 5,041,000 251,291,000 Exhibit A Summary of Validated Capital Improvement Program 2003-04 Budget Total Est. Cost 2003-04 Project Project to Date Cashflow Future Number Budget 6/30/03 Budget Budget Primary Treatment Pri. Clarifiers 16-31 & Related Facilities P1-37 88,561,000 40,683,000 14,660,000 33,218,000 Primary Treatment Rehab/Refurb P2-80 55,093,000 93,000 53,000 54,947,000 Circular Clarifier Drive ReplacemenVUpgrade P2-85 3,467,000 295,000 1,142,000 2,030,000· Sludge Density Meter Upgrades SP-70 800,000 20,000 780 000 Primary Treatment Total 147,921,000 41,091,000 16,635,000 90,195,000 Secondary Treatment New secondary treatment system at Plant No. 1 P1-102 251, 100,000 451,000 250,649,000 Trickling Filter Rehabilitation and New Clarifiers P1-76 46,210,000 4,166,000 12,000,000 30,044,000 Activated Sludge Plant Rehabilitation P1-82 23,870,000 14,000 350,000 23,506,000 Sec. Treat. Monitoring & Cntrl Sys. Upgrade p2-47-3 8,703,000 787,000 5,560,000 2,356,000 Secondary Plant Rehabilitation P2-74 20,474,000 125,000 243,000 20,106,000 New Trickling Filters P2-90 128,727,000 100,000 128,627,000 Oxygen Plant ReplacemenVRehabilitation Assessment SP-72 2,145,000 105,000 40,000 2,000,000 Activated Sludge Aeration Basin Selector Study SP-74 945,000 157,000 788,000 Computer Modeling of Activated Sludge System SP-91 120,000 120,000 Secondary Treatment"Total 482,294,000 5,354,000 19,652,000 457,288,000 Solids Handling & Digestion Sludge Digester Rehabilitation at Plant 1 P1-100 30,223,000 1,000 519,000 29,703,000 Sludge Dewatering and Odor control at Plant 1 P1-101 62,905,000 50,000 317,000 62,538,000 Ammonia Side Stream Treatment P1-96 18,600,000 58,000 557,000 17,985,000 Digesters, Centrifuge/Press & Cake Storage Hopper P1-99 61,605,000 61,605,000 Solids Storage and Truck Loading Facility P2-60 14,582,000 13,505,000 1,077,000 Digesters and Sludge Cake Hoppers at Plant 2 P2-89 .42,325,000 86,000 42,239,000 Digester Rehabilitation at Plant 2 P2-91 25,621,000 5,000 264,000 25,352,000 Sludge Dewatering and Odor control at Plant 2 P2-92 79,082,000 79,082,000 High Rate Digester Mix Pumps Mech. Seals SP-30-2 517,000 485,000 32,000 Sludge Grinder Replacement SP-36 224,000 204,000 20,000 Tule Ranch Maintenance/Biosolids Management Needs SP-79 200,000 100,000 100,000 Solids Handling & Digestion Total 335,884,000 14,308,000 2,972,000 318,604!000 Ocean Outfall Systems Peak Flow Management J-67 11,257,000 1,064,000 1,500,000 8,693,000 Effluent Pumping Station Annex J-77 50,757,000 4,113,000 8,001,000 38,643,000 Short Term Outfall Bacteria Reduction J-87 7,578,000 1,262,000 3,651,000 2,665,000 NPDES Permit Renewal SP-88 1,512,000 893,000 355,000 264 000 Exhibit A Summary of Validated Capital Improvement Program 2003-04 Budget Total Est. Cost 2003-04 Project Project to Date Cashflow Future Number Budget 6/30/03 Budget Budget Ocean Outfall Systems Total 71,104,000 7,332,000 13,507,000 50,265,000 Utility Systems Elec. Power System Single-line Diagrams J-25-5 3,368,000 911,000 2,457,000 Standby Power and Reliability Modifications J-33-1A 17,643,000 12,598,000 5,045,000 Cable Tray Improvements at Plants 1 & 2 J-47 29,526,000 1, 149,000 1, 116,000 27,261,000 Central Generation Automation J-79 8,038,000 780,000 2,002,000 5,256,000 Area Classification Studies Implementation Plan J-92 21,283,000 10,021,000 5,062,000 6,200,000 Plant 1 66kV Substation P1-97 4,645,000 53,000 102,000 4,490,000 Gas Compressor Addition at Plant No. 2 P2-79 4,326,000 466,000 193,000 3,667,000 Utilities Rehabilitation and Refurbishment P2-82 4,929,000 831,000 1,478,000 2,620,000 Fuel Station Replacement at Plant No. 2 P2-87 3,231,000 46,000 433,000 2,752,000 Electrical Equipment Refurbishment and Protection SP-81 3,312,000 49,000 197,000 3,066,000 Rehabilitation of Low Pressure Gas Holder SP-92 422,000 422,000 Indoor/Outdoor Lighting Study SP-93 132,000 5,000 127,000 Plant 1 Plant Water VFD Replacement SP-94 2,334,000 37 000 107 000 2,190,000 Utility Systems Total 103, 189,000 26,035,000 17,195,000 59,959,000 Odor Control Related Projects Facilities Modifications for Odor Control J-71-3 4,127,000 624,000 1,500,000 2,003,000 Rehabilitation of Odor Control Facilities J-71-8 33,224,000 18,000 711,000 32,495,000 Odor Control Related Projects Total 37,351,000 642,000 2,211,000 34,498,000 Plant Automation & Computerization Power Monitoring and Control Systems J-33-3 3,790,000 24,000 169,000 3,597,000 Plant Reinvention I Automation Project J-42 21,915,000 14,255,000 903,000 6,757,000 Document Management SP-01 864,000 545,000 319,000 Data Integration SP-02 4,334,000 2,940,000 569,000 825,000 Strategic Information Architecture (SIA) SP-03 724,000 440,000 50,000 234,000 Internet/Intranet Development SP-09 650,000 250,000 235,000 165,000 CMMS System Replacement SP-100 3,789,000 250,000 3,539,000 Source Control Programming SP-13 2,956,000 1,156,000 600,000 1,200,000 Geographic Information System SP-15 4,157,000 415,000 423,000 3,319,000 SCADA System Replacement Study SP-61 300,000 300,000 SCADA Graphics Tagging Update SP-62 425,000 56,000 255,000 114,000 FIS Upgrade SP-64 3,213,000 1,663,000 880,000 670,000 Information Technology Disaster Recovery SP-65 332,000 28,000 304,000 Network Equipment upgrade SP-89 2,901,000 1,099,000 604,000 1, 198,000 Plant Automation & Computerization 1 50,350,000 22,871,000 5,542,000 21,937,000 Exhibit A Summary of Validated Capital Improvement Program 2003-04 Budget Total Est. Cost 2003-04 Project Project to Date Cashflow Future Number Budget 6/30/03 Budget Budget Process Related Special Projects Standard Specifications Revisions and Updates J-44-R 657,000 493,000 14,000 150,000 Effluent Pathogen Reduction Alternatives Plan J-94 1,549,000 619,000 930,000 Plant O&M Manual & SOP Project -Phase I SP-53 4,000,000 250,000 150,000 3,600,000 Hazardous Energy Control Procedures SP-54 1,190,000 600,000 296,000 294,000 Corrosion Management SP-68-1 7,548,000 115,000 3,761,000 3,672,000 Special Projects: Anoxic Gas Flotation (AGF) SP-90-1 798,000 530,000 268,000 Special Projects: Anaerobic Baffled Reactor (ABR) SP-90-2 514,000 45,000 469,000 Special Projects: Primary Effluent Filtration SP-90-3 470,000 360,000 110,000 Special Projects: Oxygen Ionization I Odor Control SP-90-4 210,000 210,000 Special Projects: Microfiltration/Primary Effluent SP-90-5 4,095,000 3,500,000 595,000 Special Projects: Dewatering Options Comparison SP-90-6 99,000 99,000 Special Projects: Biotrickling Filter (BTF) SP-90-7 328,000 280,000 48,000 Special Projects: Ammonia Reduction Options SP-90-8 277,000 277,000 Process Related Special Projects Tota 21,735,000 6,792,000 7,227,000 7,716,000 Miscellaneous & Support Projects Facilities Engineering Projects -Joint FE-J 18,200,000 1, 145,000 17,055,000 Facilities Engineering Projects -Plant 1 FE-P1 18,200,000 1, 145,000 17,055,000 Facilities Engineering Projects -Plant 2 FE-P2 18,200,000 1,145,000 17,055,000 Interim Fae Record & Eng Data Syst Main! Services J-25-6 628,000 394,000 234,000 Supplemental Full Secondary Treatment CEQA Doc. J-40-10 425,000 153,000 272,000 Supplement No. 1 to the 1999 Strategic Plan EIR J-40-5 832,000 265,000 567,000 Long Range Biosolids Management Plan J-40-7 2,833,000 164,000 2,669,000 Strategic Plan Update J-40-9 3,419,000 496,000 1,420,000 1,503,000 Modifications to Existing Mech. Systems J-62 3,007,000 275,000 150,000 2,582,000 Building Rehabilitation/Refurbishment J-69 1,455,000 929,000 526,000 Space Allocation and Interior Renovation J-84 16,388,000 836,000 2,615,000 12,937,000 Laboratory Rehabilitation J-88 1,829,000 20,000 169,000 1,640,000 Tenant Improvements to Rebuild Shop J-89 321,000 1,000 89,000 231,000 Engineering Trailer Complex J-90 2,006,000 1,840,000 166,000 Support Building Power System Modifications P1-103 2,751,000 5,000 205,000 2,541,000 Security System Improvements SP-06 1, 100,000 531,000 569,000 Small Cap. Equip. Replacement Project SP-34 3,000,000 1,500,000 500,000 1,000,000 Asset Management Program SP-68-2 16,555,000 4,226,000 12,329,000 Exhibit A Summary of Validated Capital Improvement Program 2003-04 Budget Total Est. Cost Project Project to Date Number Budget 6/30/03 Warehouse Reinvention Project SP-77 600,000 14,000 Plume Modeling SP-85 377,000 249,000 Plant 2 Maintenance Building Modifications SP-98 300,000 Miscellaneous & Support Projects Tot; 112,426,000 6,590,000 Water Management Projects Groundwater Replenishment System J-36 236,206,000 21,908,000 Water Conservation J-72 4,644,000 Co-op Projects, Inflow/Infill. Reduction J-73 72,000,000 Long Term Permanent Monitoring Program J-73-2 2,852,000 Water Management Projects Total 315, 702,000 211908,000 Total Treatment and Disposal Projects 2,517,592,000 197,778,000 Capital Equipment Purchases 65,2071600 3,000,000 Total Capital Improvement Program $ 2,582,799,600 $ 200,778,000 2003-04 Cashflow Budget 190,000 128,000 300,000 18,7141000 43,125,000 506,000 4,000,000 713,000 48,344,000 195,809,000 411431600 $ 199,9521600 Future Budget 396,000 87,122,000 171,173,000 4,138,000 68,000,000 2,139,000 245,4501000 2, 124,005,000 58,0641000 $ 21182,0691000