HomeMy WebLinkAboutOCSD 00-11RESOLUTION NO.OCSD 00-11
MAKING CERTAIN FINDINGSRELATING TO LESS THAN
SIGNIFICANT ENVIRONMENTAL EFFECTS IDENTIFIED IN THE
MITIGATED NEGATIVE DECLARATION FOR THE
REPLACEMENT OF THE BACK BAY TRUNK SEWER PROJECT:
APPROVING MITIGATION MEASURES:ADOPTING THE FINAL
MITIGATED NEGATIVE DECLARATION FOR THE
REPLACEMENT OF THE BACK BAY TRUNK SEWER PROJECT:
AUTHORIZING THE FILING OF A NOTICE OF DETERMINATION
RE SAID PROJECT:AND ADOPTING A MITIGATION
MONITORING AND REPORTING PROGRAM
A RESOLUTION OF THE BOARD OF DIRECTORS OF ORANGE
COUNTY SANITATION DISTRICT MAKING CERTAIN FINDINGS
RELATING TO LESS THAN SIGNIFICANT ENVIRONMENTAL
EFFECTS IDENTIFIED IN THE MITIGATED NEGATIVE
DECLARATION FOR THE REPLACEMENT OF THE BACK BAY
TRUNK SEWER PROJECT;APPROVING MITIGATION
MEASURES;ADOPTING THE FINAL MITIGATED NEGATIVE
DECLARATION FOR THE REPLACEMENT OF THE BACK BAY
TRUNK SEWER PROJECT;AUTHORIZING THE FILING OF A
NOTICE OF DETERMINATION RE SAID PROJECT;AND
ADOPTING A MITIGATION MONITORING AND REPORTING
PROGRAM
WHEREAS,the Board of Directors of Orange County Sanitation District
(‘tDistrict”)is presently considering the adoption of a Mitigated Negative
Declaration for the Replacement of the Back Bay Trunk Sewer Project;and
WHEREAS,District is the Lead Agency for the preparation and
consideration of environmental documents for a Mitigated Negative Declaration
for the Project,which is consistent with the 1999 Strategic Plan Program
Environmental Impact Report,pursuant to the California Environmental Quality
Act of 1970,as amended (“CEQA”),the State of California CEQA Guidelines,
and District’s CEQA procedures;and,
WHEREAS,to assess the Replacement of the Back Bay Trunk Sewer
Project environmental impacts objectively,District prepared an Initial Study to
assess the significant environmental impacts,mitigation measures,and
alternatives associated with the Replacement of the Back Bay Trunk Sewer
Project;and,
WS&S —BRH:pj:05/1 5/00:#1 20762 1
WHEREAS,the Initial Study resulted in a determination that there
were less than significant impacts associated with the proposed project if
certain mitigation measures were implemented,therefore a Mitigated
Negative Declaration was prepared;and,
WHEREAS,District has consulted with other public agencies and the
general public,giving them an opportunity to comment on the Initial Study and
Mitigated Negative Declaration,as required by CEQA;and,
WHEREAS,District has objectively evaluated,received,and filed
comments from public agencies and persons who reviewed the Initial Study and
Mitigated Negative Declaration;and,
WHEREAS,the comments and recommendations received on the Initial
Study and Mitigated Negative Declaration,either in full or in summary,together
with the District’s responses to significant environmental concerns raised in the
review,have been included in the Final Mitigated Negative Declaration;and,
WHEREAS,said Final Mitigated Negative Declaration has been presented
to the members of the District’s Board of Directors for review and consideration
prior to the final approval of,and commitment to,the Final Mitigated Negative
Declaration for the Replacement of the Back Bay Trunk Sewer Project;and,
WHEREAS,District has prepared a Mitigation Monitoring and Reporting
Program,designed to ensure that the approved mitigation measures are
implemented during project construction and operation.
NOW,THEREFORE,the Board of Directors of Orange County Sanitation
District,
DOES HEREBY RESOLVE,DETERMINE,FIND,AND ORDER:
Section 1 That changes or alterations have been required in,or
incorporated into,the proposed project,before the proposed Negative
Declaration and Initial Study were released for public review,which avoid or
mitigate significant environmental effects to a point where clearly no significant
effect on the environment would occur,all identified in the Final Mitigated
Negative Declaration.
Section 2 That there is no substantial evidence that the project will
have a significant impact on the environment.
Section 3 That the Mitigated Negative Declaration reflects District’s
independent judgment and analysis.
WS&S —BRH:pj:05/15/OO:#1 20762 2
Section 4 The documents and other materials that constitute the
record of proceedings upon which the District’s decision is based are located at
the Orange County Sanitation Distriôt,1 0844 Ellis Avenue,Fountain Valley,
California,92708.The Custodian of these documents and other materials is
Mark Tomko,Project Manager.
Section 5 That the proposed project alternative consists of the
rehabilitation of a section of pipeline in Big Canyon (by use of a cured-in-place
liner)and two new parallel pipelines in Back Bay Drive.The proposed alternative
will create a number of potentially significant environmental effects that have
been identified in the Initial Study and were taken into account in selecting the
best alternative for achieving pràject objectives with minimal environmental
impacts.
Section 6 Potentially significant impacts identified in the Initial Study
and Final Mitigated Negative Declaration that will be mitigated to less-than-
significant levels by District are as follows:
A.That construction in environmentally sensitive areas will take
place between August 1,2000 and February 15,2001,to avoid the nesting
season of certain birds,including the Least Bell’s Vireo and California Light-
Footed Clapper Rail.
B.That the existing pipeline in Big Canyon will be rehabilitated
in place by use of a liner,rather than replacing the pipeline to avoid disturbing
sensitive habitat.
C.That sewage spills will be avoided during construction by
implementation of a Spill Prevention Plan.The Plan will include use of temporary
by-pass pipelines,elevated risers,and stand-by emergency equipment,including
a tank truck and pumps.
0.That a Traffic Control Plan will be developed and included as
part of the District’s Standard Plans and Specifications.Emergency vehicle
access will be provided via a locked gate accessible to all emergency service
agencies.Automobile,bicycle,and pedestrian access to the area will be
temporarily prohibited to protect public safety and facilitate a more rapid
completion of the project via fencing and detour signs.
E.Temporary loss of use of a bicycle trail along the Back Bay
Drive during construction will be mitigated by relocating the bicycle trail during
construction on alternate routes.
F.Temporary visual impacts during pipeline construction will be
mitigated by minimizing construction time and post-construction restoration.
WS&S—BRftp;:05/15/OO:#1 20762 3
G.Temporary construction noise will be mitigated by limiting
construction hours and informing the neighbors of construction activities.
H.Air emissions from equipment and vehicles will be mitigated
by continued compliance with South Coast Air Quality Management District
requirements.
I.Disruption of roadways and bikeways during construction will
be mitigated through preparation of traffic control plans that maintain maximum
safe traffic access.
J.Disruption of utility service during excavation activities will be
mitigated by coordinating with the Underground Service Alert and local utilities,
developing plans for alternative services where needed,and re-routing of
facilities where necessary and at District’s expense if a utility purveyor has prior
rights.
K.Increased emergency response times during project
construction will be mitigated by preparing traffic control plans prior to
construction and by notifying emergency services before construction schedules
are implemented.
L.Any disturbance of drainage facilities during project
construction and groundwater infiltration into open trenches and tunnels,will be
mitigated by scheduling sewer construction during dry months,coordinating with
the City of Newport Beach to protect underground facilities,and discharging
groundwater pursuant to the sewer collection system rather than surface waters
as allowed by District’s NPDES Permit.
M.Disturbance of cultural or paleontological resources during
construction will be mitigated by halting work if unusual materials are found,and
then consulting qualified professionals to examine the materials,record findings,
and properly curate any significant artifacts discovered.
N.Dust generation and air pollutant emissions from
construction vehicles will be mitigated by using watering trucks,as necessary,to
control dust and keep streets free of dust and dirt,covering trucks and dirt piles,
using properly maintained construction equipment,and discontinuing
construction during first and second stage smog alerts to the extent feasible.
Section 7 That the Board of Directors adopts the Final Mitigated
Negative Declaration.
Section 8 That the Board of Directors adopts the Mitigation Monitoring
and Reporting Program.
WS&S—BRH:pj:05/15/OO:#1 20762 4
1’
Section 9 That the Board Secretary is authorized and directed to file
the Notice of Determination and any other documents in accordance with the
requirements of CEQA and the District’s CEQA procedures.
PASSED AND ADOPTED at a regular meeting held May 24,2000.
~
ATT~T:.
.
Board Secr~tary
WS&S —BRH:pj:0511 5/OO:#1 20762 5