HomeMy WebLinkAboutResolution 1990 - 0174RESOLUTION NO.90-174-3
APPROVING PIPELINE LICENSE AGREEMENT WITH
SOUTHERN PACIFIC TRANSPORTATION COMPANY RE
CONTRACT NO.3-24-2
A RESOLUTION OF THE BOARD OF DIRECTORS OF
COUNTY SANITATION DISTRICT NO.3 OF ORANGE
COUNTY,CALIFORNIA,APPROVING PIPELINE
LICENSE AGREEMENT WITH SOUTHERN CALIFORNIA
EDISON COMPANY IN CONNECTION WITH CONSTRUCTION
OF LAMPSON INTERCEPTOR SEWER,CONTRACT
NO.3-24-2
*******************
The Board of Directors of County Sanitation District No.3 of Orange
County,California,
DOES HEREBY RESOLVE,DETERMINE AND ORDER:
Section 1 That the certain pipeline license agreement dated
September 19,1990,wherein the Southern Pacific Transportation Company (SPTC)
grants to County Sanitation District No.3 right—of—way to cross under existing
SPTC railroad tracks approximately 250 feet west of Santa Rosalia Street in
Lampson Avenue in order to construct,reconstruct,operate and maintain the
Lampson Interceptor Sewer,Contract No.3—24—2,is hereby approved and accepted;
and,
Section 2 That the real property over which said right—of—way is granted
is more particularly described and shown on Exhibits “A”and ~attached
hereto and made a part of this resolution;and,
Section 3 That payment in the amount of $510.00 for said right—of—way is
hereby authorized;and,
Section 4 That the Chairman and Secretary of the District are .hereby
authorized and directed to execute said agreement in form approved by the
General Counsel.
PASSED AND ADOPTED at a regular meeting held November 14,1990.
STATE OF CALIFORNIA)
)SS.
COUNTY OF ORANGE )
I,RITA J.BROWN,Secretary of the Board of Directors of County
Sanitation District No.3 of Orange County,California,do hereby certify that
the foregoing Resolution No.90—174—3 was passed and adopted at a regular
meeting of said Board on the 14th day of November,1990,by the following
vote,to wit:
AYES:Richard Polis,Chairman,Edward L.Allen,Margaret M.Arnold,
Wes Bannister,A.B.“Buck”Catlin,Norman E.Culver,Beth
Graham,Don R.Griffin,Dan Griset,James Neal,Carrey J.
Nelson,J.R.“Bob”Siefen,Roger R.Stanton,Charles E.
Sylvia,Edna Wilson
NOES:None
ABSENT:Irv Pickler
IN WITNESS WHEREOF,I have hereunto set my hand and affixed the official
seal of County Sanitation District No.3 of Orange County,California,this
14th day of November,1990.
f~
Rita J.Brown,~Secreta~ry <•~.
Board of Di rectoçs of Count~y~~
Sanitation Distri~tNo~3~
of Orange County,Calffb~nia
WITNESSETH
1.Railroad hereby grants to Grantee,subject to the
reservations,covenants and conditions herein contained,the
right to construct,reconstruct,maintain and operate a 21-inch
sewer pipeline within a 48-inch steel casing hereinafter
collectively referred to as “structure”,in,upon,along,across
and beneath property and tracks of Railroad,at or near
Westminster,in the County of Orange,State of California,crossing
the centerline of said tracks at Engineer’s Station 165+35,Mile
Post 516.08 in the location shown on the print of Railroad’s
Drawing No.AA-267,sheet No.1,dated April 30,1990 attached
and made a part hereof.
EXHIBIT !SA~I TO RESOLUTION NO.90-174-3
INFEWUARON BY APPLICANT
APPLICANT-1~O FILL IN ALL IIIFORUATIOH LINES OR H/A IF IT DOES NOT APPLY.
PIPE LINE CARRYiNG c:j fl.AMI.UBLE OR HAZARDOUS SUBSTANCES
-I SEE RAILROAD STANDARD CS.742 1
—NON—FLAM).IABLE SIJGSTAHCES
I SEE RAILROAD STANDARD C.5.1741 I
•CULVERT
~PPUCAflT
A.DDRESS
.~o,’87
~c~jy’~STATE ZIP Z2..~Y2.
COUNTY ~PHONE
CONTACT PRRSDN ~PHONE .1/7~iW....
FACILITY.....
PURPOSE ~
IF PIPE OR CASING DIAMETER IS GREATER THAN 3~-G APPLICANT SHALL SUBMIT
ENGINEERING PLANS.CALCULATIONS.SPECIFICATIONS.AND SOILS HEPORT.
DISTANcE TO pErII4ANENT RAILWAY STRUCTURE
ANGLE OF cROSSING WITH RACKS ~Q.°
SOIL CLASSIFICATION
PIPE SLOPE OR GRADIENT CARRIER ONG
CONTENTS TO BE HANDLED ‘,‘~_‘~n
NOMINAL DIAMETER
4S
PIPE MATERIAL I/lIZIfI’P ~X
SPECIFICATION AND GRADE ~~
WALL THICKNESS 4
OPERATING PRESSURE/MAXMIUM PRESSURE
MINIMUM YIELD STRENGTH L’..
TYPE OF JOINT
COATING MATERIAL .
METHOO OF INSTALLATION ~~
LERCTH OF CASING IACTUAL)JPG,
DISTAHCE OF CASING PERPENDICULAR FROM CENTERLINE OF TRACI<L ?...R
VENTS:NUMBER SIZE DISTANCE OUT FROM CENTERLINE L ~R
DISTANCE TO SHUT—OFF VALVES ON EACII SIDE OF R/W /,&~U
BURY:BASE OF RAIL TO TOP OF CASING ~
BURY:ROADWAY DITCHES
TYPE.SIZE AND SPACING OF INSULATORS OR SUPPORTS
SEALS AT ENDS OF CASING:BOTH ENDS ONE END TYPE
CATHODIC PRO1ECTION:
LONGITUDINAL PIPELINES
DISTANCE FROM TRACK CENTERLINE ~U ..~
DEPTH OF BURl TO TOP OF PIPE MAX
HEIGHT FROM BASE OF FlAIL TO TOP OF PIPE MAX
FLAMMABLE SUOSTAIICE PIPEt.INE:CLASS LOCATION ...4A....DESIGN FACTOR
PLAN OF PIPELINE
MG DCM.C
SEC11OH A—A
PIPCLINC CARRYING t40H-FLAMMABLE SUBSTANCES
~EE CS.1711
110 SCaLE
INFORMATiON ~Y RAILROAD
RAILROAD CORP ~
STATION NAME ~
ROUTE ~MP~Lk~.c~.e~
MAIN LINE
——
BRANCH LINE .T~tIc’J~
OTHER
E.S
DIST.L~....5o DIST.R .~~
VAL.SEC IL~—%~SHT
RELMIS HO.
.....
NO.OF TRACXS CROSSED I
JOINT FACILITY LINE YES
RAILROAD INSPECTION
REQUIRED
ESTIMATED COST
PHONE CALL FOR IHSPECTIOHI
)~
REGION WESTERN
DRAWING HO ~
SHEET NO
DATE
BY ~
CHECKED BY...~??....
SIT (NCII.5TATION Oil MILE POST UNIOIOWCI.GIVE TilE DISTANCE ALONG TIIAO(
ff1014 NAILIIOAO TTTIUCTUZIC DII CENTLIILIN(Of PUIIUC STREET CflOSSING.
NORTH ~,
11/W
A
PROJECT UAIIIIXR REO~D
1 /FOR UHIIOIQIOuNO PIPELINE
-~
MCII.STATION 1..~
TO ~?~0A
OOUO~UUVIIUUW1UIIDUUUI1HLIIIUflVU
PIIOJECT UAAVII(fl(OD
lOll UNISIICIIOIIIIO PIPELIIIE
VliVH~HVHHUflUUIIilHIIW1~
\....Q.OF TRAO(
IPEI.IIE
Il/V
-
A
tn
z
H
Ui
H
‘-3
-Ui
1-3
0
tn
U)
0
t.4
H
0
Z N~.
1.0
1-a
•‘-.I
La)
Ii.
U
MATERIALS AuG INSTALLATION PER S.P.DRAWING NO.C.E c.~.
UNOEIIGI1OUI1D SIGNAL OIl COUMUNICAIIOII LINE INVOLVED.YES
...140...
SIIOIAING PLAN RHO CALCULATIONS flEO~O PRIOR TO CONSTRUCTION.YES NO...
REFCFIINCE TO ASSIGNED BLANKEr AGREEMENT NO
APPROVED —REGIONAL ENGR.DATE
t ~
MInI_
ROt
OCIIED,
I (OCt11 Or (AIIm rIPE
SECTION A—A
PII5ELIHE CARRY INC FLAMMABLE SUBSTAHCE3~
SEE CS.1712
NO SCaLE
SOUTHERN PACIFIC 11IANSPORTAT1ON Co.
ST.LOUIS SOUTHWESTERN RY.CO.
SOUTHERN PACIFIC CHICAGO ST.LOUIS CORP.
DATA REQUIRED FOR PROPOSED
PIPELINE ACROSS OR ALONG
RIGHT OF WAY
~101114 CD.41700.SIIEET I REVISED MAR.IS.ISDO
APPROXIMATE DATE WORK WILL BE DOME
MINIMUM OF 40 HOURS IIOTICE flEOUIRED PRIOR TO CONSTITUCTIOIII