Loading...
HomeMy WebLinkAboutResolution 1990 - 0174RESOLUTION NO.90-174-3 APPROVING PIPELINE LICENSE AGREEMENT WITH SOUTHERN PACIFIC TRANSPORTATION COMPANY RE CONTRACT NO.3-24-2 A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY SANITATION DISTRICT NO.3 OF ORANGE COUNTY,CALIFORNIA,APPROVING PIPELINE LICENSE AGREEMENT WITH SOUTHERN CALIFORNIA EDISON COMPANY IN CONNECTION WITH CONSTRUCTION OF LAMPSON INTERCEPTOR SEWER,CONTRACT NO.3-24-2 ******************* The Board of Directors of County Sanitation District No.3 of Orange County,California, DOES HEREBY RESOLVE,DETERMINE AND ORDER: Section 1 That the certain pipeline license agreement dated September 19,1990,wherein the Southern Pacific Transportation Company (SPTC) grants to County Sanitation District No.3 right—of—way to cross under existing SPTC railroad tracks approximately 250 feet west of Santa Rosalia Street in Lampson Avenue in order to construct,reconstruct,operate and maintain the Lampson Interceptor Sewer,Contract No.3—24—2,is hereby approved and accepted; and, Section 2 That the real property over which said right—of—way is granted is more particularly described and shown on Exhibits “A”and ~attached hereto and made a part of this resolution;and, Section 3 That payment in the amount of $510.00 for said right—of—way is hereby authorized;and, Section 4 That the Chairman and Secretary of the District are .hereby authorized and directed to execute said agreement in form approved by the General Counsel. PASSED AND ADOPTED at a regular meeting held November 14,1990. STATE OF CALIFORNIA) )SS. COUNTY OF ORANGE ) I,RITA J.BROWN,Secretary of the Board of Directors of County Sanitation District No.3 of Orange County,California,do hereby certify that the foregoing Resolution No.90—174—3 was passed and adopted at a regular meeting of said Board on the 14th day of November,1990,by the following vote,to wit: AYES:Richard Polis,Chairman,Edward L.Allen,Margaret M.Arnold, Wes Bannister,A.B.“Buck”Catlin,Norman E.Culver,Beth Graham,Don R.Griffin,Dan Griset,James Neal,Carrey J. Nelson,J.R.“Bob”Siefen,Roger R.Stanton,Charles E. Sylvia,Edna Wilson NOES:None ABSENT:Irv Pickler IN WITNESS WHEREOF,I have hereunto set my hand and affixed the official seal of County Sanitation District No.3 of Orange County,California,this 14th day of November,1990. f~ Rita J.Brown,~Secreta~ry <•~. Board of Di rectoçs of Count~y~~ Sanitation Distri~tNo~3~ of Orange County,Calffb~nia WITNESSETH 1.Railroad hereby grants to Grantee,subject to the reservations,covenants and conditions herein contained,the right to construct,reconstruct,maintain and operate a 21-inch sewer pipeline within a 48-inch steel casing hereinafter collectively referred to as “structure”,in,upon,along,across and beneath property and tracks of Railroad,at or near Westminster,in the County of Orange,State of California,crossing the centerline of said tracks at Engineer’s Station 165+35,Mile Post 516.08 in the location shown on the print of Railroad’s Drawing No.AA-267,sheet No.1,dated April 30,1990 attached and made a part hereof. EXHIBIT !SA~I TO RESOLUTION NO.90-174-3 INFEWUARON BY APPLICANT APPLICANT-1~O FILL IN ALL IIIFORUATIOH LINES OR H/A IF IT DOES NOT APPLY. PIPE LINE CARRYiNG c:j fl.AMI.UBLE OR HAZARDOUS SUBSTANCES -I SEE RAILROAD STANDARD CS.742 1 —NON—FLAM).IABLE SIJGSTAHCES I SEE RAILROAD STANDARD C.5.1741 I •CULVERT ~PPUCAflT A.DDRESS .~o,’87 ~c~jy’~STATE ZIP Z2..~Y2. COUNTY ~PHONE CONTACT PRRSDN ~PHONE .1/7~iW.... FACILITY..... PURPOSE ~ IF PIPE OR CASING DIAMETER IS GREATER THAN 3~-G APPLICANT SHALL SUBMIT ENGINEERING PLANS.CALCULATIONS.SPECIFICATIONS.AND SOILS HEPORT. DISTANcE TO pErII4ANENT RAILWAY STRUCTURE ANGLE OF cROSSING WITH RACKS ~Q.° SOIL CLASSIFICATION PIPE SLOPE OR GRADIENT CARRIER ONG CONTENTS TO BE HANDLED ‘,‘~_‘~n NOMINAL DIAMETER 4S PIPE MATERIAL I/lIZIfI’P ~X SPECIFICATION AND GRADE ~~ WALL THICKNESS 4 OPERATING PRESSURE/MAXMIUM PRESSURE MINIMUM YIELD STRENGTH L’.. TYPE OF JOINT COATING MATERIAL . METHOO OF INSTALLATION ~~ LERCTH OF CASING IACTUAL)JPG, DISTAHCE OF CASING PERPENDICULAR FROM CENTERLINE OF TRACI<L ?...R VENTS:NUMBER SIZE DISTANCE OUT FROM CENTERLINE L ~R DISTANCE TO SHUT—OFF VALVES ON EACII SIDE OF R/W /,&~U BURY:BASE OF RAIL TO TOP OF CASING ~ BURY:ROADWAY DITCHES TYPE.SIZE AND SPACING OF INSULATORS OR SUPPORTS SEALS AT ENDS OF CASING:BOTH ENDS ONE END TYPE CATHODIC PRO1ECTION: LONGITUDINAL PIPELINES DISTANCE FROM TRACK CENTERLINE ~U ..~ DEPTH OF BURl TO TOP OF PIPE MAX HEIGHT FROM BASE OF FlAIL TO TOP OF PIPE MAX FLAMMABLE SUOSTAIICE PIPEt.INE:CLASS LOCATION ...4A....DESIGN FACTOR PLAN OF PIPELINE MG DCM.C SEC11OH A—A PIPCLINC CARRYING t40H-FLAMMABLE SUBSTANCES ~EE CS.1711 110 SCaLE INFORMATiON ~Y RAILROAD RAILROAD CORP ~ STATION NAME ~ ROUTE ~MP~Lk~.c~.e~ MAIN LINE —— BRANCH LINE .T~tIc’J~ OTHER E.S DIST.L~....5o DIST.R .~~ VAL.SEC IL~—%~SHT RELMIS HO. ..... NO.OF TRACXS CROSSED I JOINT FACILITY LINE YES RAILROAD INSPECTION REQUIRED ESTIMATED COST PHONE CALL FOR IHSPECTIOHI )~ REGION WESTERN DRAWING HO ~ SHEET NO DATE BY ~ CHECKED BY...~??.... SIT (NCII.5TATION Oil MILE POST UNIOIOWCI.GIVE TilE DISTANCE ALONG TIIAO( ff1014 NAILIIOAO TTTIUCTUZIC DII CENTLIILIN(Of PUIIUC STREET CflOSSING. NORTH ~, 11/W A PROJECT UAIIIIXR REO~D 1 /FOR UHIIOIQIOuNO PIPELINE -~ MCII.STATION 1..~ TO ~?~0A OOUO~UUVIIUUW1UIIDUUUI1HLIIIUflVU PIIOJECT UAAVII(fl(OD lOll UNISIICIIOIIIIO PIPELIIIE VliVH~HVHHUflUUIIilHIIW1~ \....Q.OF TRAO( IPEI.IIE Il/V - A tn z H Ui H ‘-3 -Ui 1-3 0 tn U) 0 t.4 H 0 Z N~. 1.0 1-a •‘-.I La) Ii. U MATERIALS AuG INSTALLATION PER S.P.DRAWING NO.C.E c.~. UNOEIIGI1OUI1D SIGNAL OIl COUMUNICAIIOII LINE INVOLVED.YES ...140... SIIOIAING PLAN RHO CALCULATIONS flEO~O PRIOR TO CONSTRUCTION.YES NO... REFCFIINCE TO ASSIGNED BLANKEr AGREEMENT NO APPROVED —REGIONAL ENGR.DATE t ~ MInI_ ROt OCIIED, I (OCt11 Or (AIIm rIPE SECTION A—A PII5ELIHE CARRY INC FLAMMABLE SUBSTAHCE3~ SEE CS.1712 NO SCaLE SOUTHERN PACIFIC 11IANSPORTAT1ON Co. ST.LOUIS SOUTHWESTERN RY.CO. SOUTHERN PACIFIC CHICAGO ST.LOUIS CORP. DATA REQUIRED FOR PROPOSED PIPELINE ACROSS OR ALONG RIGHT OF WAY ~101114 CD.41700.SIIEET I REVISED MAR.IS.ISDO APPROXIMATE DATE WORK WILL BE DOME MINIMUM OF 40 HOURS IIOTICE flEOUIRED PRIOR TO CONSTITUCTIOIII