Loading...
HomeMy WebLinkAboutResolution 1982 - 0098RESOLUTION NO.82-98 AUTHORIZING NEGOTIATION AND EXECUTION OF ADDENDUM NO.3 TO AGREEMENT WITH JOHN CAROLLO ENGINEERS RE JOB NO.P2-25 A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS OF COUNTY SANITATION DISTRICTS NOS.1,2,3,5, 6,7 AND 11 OF ORANGE COUNTY,CALIFORNIA, AUTHORIZING THE SELECTION COMMITTEE TO NEGOTIATE ADDENDUM NO.3 TO AGREEMENT WITH JOHN CAROLLO ENGINEERS RE JOB NO.P2-25,TO PROVIDE FOR DESIGN CHANGES AND AUTHORIZING THE GENERAL MANAGER TO EXECUTE SAID ADDENDUM WHEREAS,the Districts have heretofore entered into an agreement with John Carollo Engineers for design of Flow Equalization and Hydraulic Reliability Facilities at Plant No.2,Job No.P2—25;and, WHEREAS,the State Water Resources Control Board has listed the Hydraulic Reliability Facilities on its Draft Priority List for 1983 grant funds;and, WHEREAS,since the project was designed,the Districts have evaluated an alternative method for the pump discharge which will result in lower construction and operation costs;and, WHEREAS,in order to apply for said grant funds,all final plans and specifications must be approved by the State Water Resources Control Board by September 30,1982;and, WHEREAS,it is now deemed appropriate to amend the agreement with John Carollo Engineers to provide for said changes to the plans and specifications to be completed in time to submit to the State Water Resources Control Board by the September 30th deadline;and, WHEREAS,the Boards of Directors of County Sanitation Districts Nos.1,2, 3,5,6,7 and 11 of Orange County have heretofore adopted a policy establishing procedures for the selection of professional engineering and architectural services. NOW,THEREFORE,the Boards of Directors of County Sanitation Districts Nos.1,2,3,5,6,7 and 11 of Orange County,California, DO HEREBY RESOLVE,DETERMINE AND ORDER: Section 1 That the Selection Committee established pursuant to Districts’ procedures for the selection of professional engineering and architectural services,is hereby authorized to negotiate Addendum No.3 to Engineering Services Agreement with John Carollo Engineers for design of Flow Equalization and Hydraulic Reliability Facilities at Plant No.2,Job No.P2—25,to provide for additional services required to change the design of the Hydraulic Reliability Facilities in order to lower the construction and operation costs of said project;and, Section 2 That upon certification by the Selection Committee of a final negotiated fee,not to exceed $10,000.00,for said additional services,the General Manager is hereby authorized and directed to execute said Addendum No.3 in form approved by the General Counsel. PASSED AND ADOPTED at a regular meeting held July 14,1982. STATE OF CALIFORNIA) COUNTY OF ORANGE SS. I,J.WAYNE SYLVESTER,Secretary of the Boards of Directors of County Sanitation Districts Nos.1,2,3,5,6,7 and 11 of Orange County, California,do hereby certify that the foregoing Resolution No.82—98 was passed and adopted at a regular meeting of said Boards on the 14th day of July,1982,by the following vote,to wit: AYES:Ruth Bailey,Barbara Brown,John C.Cox,Jr.,Norman E.Culver, Richard B.Edgar,Bruce Finlayson,Ruth Finley,Donald Fox, Henry R.Frese,Sal Gambina,Don R.Griffin,Robert Hanson, Evelyn Hart,Donald A.Holt,Jr.,Elvin Hutchison,Frank J. Laszlo,Robert Luxembourger,Gerald Mullen,Ron Pattinson,Bob Perry,Ruthelyn Plummer,Charles J.Rell,Thomas F.Riley,Earl C.Roget,Don Roth,Don Saltarelli,Don E.Smith,Roger R. Stanton,Charles E.Sylvia,Bill Vardoulis,James Wahner,Henry W.Wedaa,Dorothy Wedel,Harriett M.Wieder,Duane Winters NOES:None ABSENT:Marvin P.Adler,Jacqueline Heather,Carol Kawanami IN WITNESS WHEREOF,I have hereunto set my hand and affixed the official seal of County Sanitation District No.1 on behalf of itself and Districts Nos.2,3,5,6,7 and 11 of Orange County,California,this 14th day of July, 1982. J.Wã~ne~y](v~ter,Seci:etary Boards c~Di~tors,County Saz?4.tat~on Districts Nos.1’,2,3, and 1].of Orange County, California (. 1•