HomeMy WebLinkAboutResolution 1974 - 0101-RESOLUTION NO.7~4.-lO1
ORDERING VALUE OF ABANDONED OR REMOVED
STRUCTURES AND EQUIFNENT REMOVED FROM
BOOKS OF ACCOUNT
A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS
OF COUNTY SANITATION DISTRICTS NOS.1,2,3,
5,6,7,AND 11 OF ORANGE COUNTY,CALIFORNIA,
ORDERING THE VALUE OF CERTAIN ABANDONED OR
REMOVED STRUCTURES AND EQUIP~NT REMOVED FROM
THE DISTRICTS’BOOKS OF ACCOUNT
The Boards of Directors of County Sanitation Districts Nos.1,
2,3,5,6,7,and 11 of Orange County,California,
RESOLVE AS FOLLOWS:
WHEREAS,certain jointly—owned capital improvements during the
course of expansion of treatment and disposal facilities,are from
time to time abandoned or demolished and are no longer required for
the purposes of the Districts;and,
WHEREAS,conformance to generally accepted accounting principals
and procedures require that assets disposed of be removed from the
accounting records,
NOW,THEREFORE,IT IS HEREBY RESOLVED AND ORDERED THAT:
The certain jointly—owned structures and equipment set forth
and suimnarized on Exhibit “A”attached hereto and made a part of this
•resolution,are hereby formally abandoned,and the value thereof is
hereby ordered removed from the Districts’Books of Account effective
June 30,l97~.
PASSED AND ADOPTED at a regular meeting held August l~,l97~.
EXHIBIT “A”
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
ITEMIZATION AND DISTRIBUTION OF COST OF JOINTLY
OWNED STRUCTURES AND EQUIPMENT ABANDONED
as of June 30,19711
STRUCTURES &FACILITIES ABANDONED OR REMOVED
Contract P1—3 (Installed June 30,1959
Estimated cost of items removed under Contract P1—9—i:
Ir~cinerator rain table,rain &motor,rain incinerator
door,and rain table hopper
Incinerator temperature controllers,indicators,
and flame sensor
Bar screens screenings conveyor belt,drive unit,
rollers,and pulleys
Estimated cost of the Headworks #1 Main Sewage Pump
impeller replaced under Districts’force account
work order No.2305
Contract J—3 (Installed December 31,1959
Estimated cost of Rothrock Booster Pump Station #1
Pump shafting replaced under Districts’force
account work order No.2360 B
Estimated cost of Rothrock Booster Pump Station #2
Pump shaft,couplings,etc.replaced under Districts’
force account work order No.2421
Estimated cost of 3 Butterfly check valves replaced under
Contract J—4—l
Contract P2—2 (Installed December 31,1960
Cost of items removed under Contract P2—li:
Beard Headworks engine drive units
Beard Headworks grit chamber equipment
Contract J—11 (Installed June 30.1961
Estimated cost of items removed under Contract J—4—i:
Pump W and pressure tank and sump pump and motor
2 trickling filter recirculation pumps and motors
2 chlorine solution water pumps and motors
10”magnetic meter
Diatomite Filter
Plant Water Pump Station handrailing,grating,stairway,
and metal control center enclosure
Surge tank
One 20 CFM compressor and 80 gallon tank
Chlorination Station monorail and 8WF 211 column
““ejectors (6)
solution and other piping
Contract P2—3 (Installed June 30,1961
Estimated cost of Pump Room fluorescent fittings replaced
under Districts’force account work order No.23611
Estimated cost of Sedimentation Basin E sludge withdrawal
line replaced under Districts’force account work order
No.21128
Contract J—3—A (Installed December 31,1961
Estimated cost of one Butterfly check valve replaced under
Contract J~14_l
Estimated cost of Rothrock Booster Pump Station #14 engine
parts (cylinder heads,pistons,rods,etc.)replaced
under Districts’force account work order No.2387
68,180.00
30,620.00
6,925.00
8,207.00
18,537.00
3,183.00
1,592.00
10,000.00
1,000.00
2,000.00
600.00
2,500.00
15,1811.00
$3,486.00
900.00
2,500.00
11,000.00
1,500.00
11,500.00
15,000 .00
N
N.
1,800.00
2,200.00
5,000.00
3,500.00
Contract J—6 (Installed December 31,1963
Estimated cost of a #1 Surge Tower 78”sluice gate
replaced under Contract P2—li—i $10,675.00
Contract P2—5 (Installed December 31,1963
Estimated cost or grit pipe abandoned under P2—la 1,000.00
Contract P1—9 (Installed June 30.19614
Estimated cost of secondary treatment facilities abandoned
under Contract P1—9—i:
Trickling Filter Pump Station #2 10,1100 GPM recirculation
pump and motor 9,200.00
Trickling filter slide gates and operators 361.08
Contract P1—7—2 (Installed December 31,19611
Estimated cost of centrifuge sump pump replaced under
Districts’force account workorder No.2400 500.00
Contract P2—10 (Installed December 31,1965
Estimated cost of Pflanz Headworks grit storage hopper
and conveyer abandoned under Contract J—4—l 16,720.93
Contract P2—li (Installed December 31,1969
Estimated cost of items abandoned under Contract J—11—l:
Headworks “C”plant water pumps 5,000.00
JOS influent Butterfly valve and valve vault 12,000.00
Estimated cost of Headworks “C”engine (Nos.6 &8)
cylinder heads and manifolds replaced under Districts’
force account work orders Nos.2367 and 2410 13,032.00
Estimated cost of Headworks “C”engine No.8 gear
reduction unit replaced under Districts’force account
work order No.2413 800.00
Districts’Force Account Work Order Improvements
Cost of the Chlorination Water Pump Station #3 chlorine
solution water pump and motor installed under work
order No.2—1061 (Installed June 30,1965)11,816.00
Estimated cost of Chlorination Station Cl2 solution
piping installed under work orders 2236 A,B,and C
and replaced under J—4—l (Installed 1970—71)12,000.00
$299,019.01
DISTRIBUTION OF EQUITY TO DISTRICTS
1 $28,885.24
2 90,662.56
3 98,1466.96
5 18,658.79
6 17,6142.12
7 23,413.19
ii 21,290.15
$299,019.01
—2—
•STATE OF CALIFORNIA
I..ss..
COUNTY OF ORANGE
I,J0 WAYNE SYLVESTER,Secretary of the Boards of Directors
of County Sanitation Districts Nos.1,2,3,5,6,7,and 11,of
Orange County,California,do hereby certify that the above
•and foregoing Resolution No.74-101 was regularly passed and
adopted at a regular meeting of said Boards on the 14th day of~
•August ,1974 ,by the foflowing.vote,to wit:
AYES:Directors Donald Winn (Chairman),Gilbert Arbiso,Jr.,
David Baker,Robert Battin,John Burton,Edward
Byrne,Michael Callahan,Dale Chaput,Ralph Clark,
Norman Culver,Jesse Davis,Milan Dostal,Alvin Coen,
Roland Edwards,Donald Fox,Beth Graham,Jess Perez,
Miriam Kaywood,Charles Long,Leonard MacKain,Don
Mclnnis,Thomas Blackman,Robert Nevil,Bob Perry,
Ellis Porter,Kerm Rima,Howard Rogers,Robert Root,
Donald Saltarelli,George Scott,Sonia Sonju,John
•Store,.Bernie Svalstad,Joe Temple,Harriett Wieder,
and Frances Wood
NOES:None S
ABSENT:Directors John G~rthe,Norma Gibbs,and Jerry Patterson
IN WITNESS WHEREOF,I have hereunto set my hand this 14th
day of August ,1974
.
./,Wa3~1e ~yjvester,~3ecre~LJ,
p~b,Ø.rd~of Uirectors,County
S nitation Districts Nos.1,2,
,5,6,7,and 11,of Orange
County,California
8-101