Loading...
HomeMy WebLinkAbout1971 Resolution Index 0001-00501971 RESOLUTIONS 71-1-2 Approving First Amendment to Waste Water Interceptor Capacity Agreement with Riverside County Flood Control &Water Conservation District 2 01/06/71 71-2 Approving plans and specs for Sedimentation Basin “K”and Digester “K”at Plant No.2,Job No.P2-17 All 01/13/71 71-3 Establishing Employee Positions and Fixing Salaries Therefore;authorizing employment of personnel;and rescinding all resolution previously adopted in this connection All 01/13/71 71-4 Approving Amendment to Resolution No.69-99, establishing guidelines for employee relations All 01/13/71 71-5 Approving plans and specs for Sunflower Interceptor, Reach 1,Contract No.7-6-1 (from Treatment Plant No.1 to Bear Street) 01 /1 3/71 71-6-1 Awarding contract for Two 1,000 KVA Pad Mounted Substations for Plant No.2,Job No.P1-6-lA 1 01/13/71 71-7-3 Accepting Contract No.3-11 as complete and authorizing execution of a Notice of Completion therefor 3 01/13/71 71-8-3 Approving specs for Two 40 HP,675 RPM,Variable Speed Pump Drives,Project No.300008 3 01/13/71 71-9-1 Awarding Contract to Remodel Sedimentation Basins 3 &4,Plant No.1,Job No.P1-1R-1,and Sedimentation Basins A,B,and C,Plant No.2,Job No.P2-1R-1 1 01 /28/71 71-10-2 Federal and State Grants -Santa Ana River Interceptor (from Treatment Plant No.1 to Katella Avenue) 2 02/24/71 71-11 Approving p’ans and specs for Job No.P1-i 2-5, Modification of Parking Facilities for Administration Building All 02/10/71 71-12 -VOID 71-13 Establishing policy with respect to protection of beneficial uses of ocean water and requesting the California Regional Water Quality Control Board to review existing waste discharge requirements All 02/10/71 71-14 Approving Inter-district basic construction, maintenance,and operating agreement Re Main-Dyer Interceptor 1 &7 02/10/71 71-15-5 Approving Annexation of Territory to the District (Annexation #4) 5 02/10/71 71-16-3 Accepting Contract No.3-14 as complete,Westside Interceptor Facilities,Westminster Avenue lnterceptoi Sewer 3 02/10/71 71-17-3 Approving specs for one,10 inch Vertical Sewage Pump,Contract No.3-12A 3 02/10/71 71-18-2 -V0~D- 71-19-1 Authorizing execution of Quitclaim Deed to A.J. Gisler,Re Contract No.7-6-1 1 02/10/71 71-20-1 Authorizing acceptance of easement from A.J.Gisler, Re Contract No.7-6-1 1 02/10/71 71-21 Authorization to execute a Temporary Working License Agreement with A.J.Gisler,et al All 02/10/71 71-22 Authorizing acceptance of easement from A.J.Gisler, et al 1 &7 02/10/71 71-23-1 Awarding Contract for Sedimentation Basin “K”and Digester “L”at Plant No.2,Job No.P2-17 1 02/10/73 71-24-7 Awarding Contract for Sunflower Interceptor,Reach 1,Contract No.7-6-1 (Treatment Plant No.1 to Bear Street) 7 02/23/71 71-25-2 Federal and State Grants -Santa Ana River Interceptor (from Treatment Plant No.1 to Katella Avenue) 2 02/24/71 71-26-1 Adopting Joint Ownership,Operation and Construction Agreement 1 03/10/71 71-27-2 Adopting Joint Ownership,Operation and Construction Agreement 2 03/10/71 71-28-3 Adopting Joint Ownership,Operation and Construction Agreement 3 03/10/71 71-29-5 Adopting Joint Ownership,Operation and Construction Agreement 5 03/10/71 71-30-6 Adopting Joint Ownership,Operation and Construction Agreement 6 03/10/71 71-31-7 Adopting Joint Ownership,Operation and Construction Agreement 7 03/10/71 71-32-11 Adopting Joint Ownership,Operation and Construction Agreement 11 03/10/71 71-33 Accepting Job No.P2-5R-1 as complete and authorizing execution of a notice of completion All 03/10/71 71-34-1 Awarding contract for Modification of Parking Facilities for Administration Bldg.,Job No.P1-12-5 in the amount of $12,577.50 1 03/10/71 71-35-5 Approving specs for Job No.5-12B,Sewage Pump and Drive Shaft,Bay Bridge Pumping Station 5 03/10/71 71-36-3 Accepting Contract No.3-13 as complete,Westside Interceptor Facilities,Westminster Avenue Force Main (First Unit)and authorizing execution of a notice of completion 3 03/10/71 71-37 Approving plans and specs for Contract No.7-6-2, Sunflower Interceptor,Reach 2,(from Bear Street to Main Street) 1 &7 03/10/71 71-38 -VOID- 71-39-7 Approving Agreement with the City of Santa Ana, relative to the construction of the Plaza Drive Subtrunk Sewer 7 03/1 6/71 71-40-7 Approving Reimbursement Agreement (Master Plan) with C.J.Segerstrom and Sons,relative to the Plaza Drive Subtrunk Sewer 7 03/16/71 71-41-7 Approving Modification to Master Plan Report,Trunk Sewer Facilities,dated May,1 969 7 03/16/71 71-42 Accepting Job No.P2-16,Sedimentation Basin J and Digester J at Plant No.2,as complete All 04/14/71 71-43 Approving plans and specs for P2-19,Sedimentation Basins L &M and Digester L &M at Plant No.2 All 04/14/71 71-44-1 Authorizing Acceptance of Corporation Grant Deed from Levitt and Sons of California,inc.Re:Dyer Road Trunk 1 04/14/71 71-45-1 Authorizing Acceptance of Corporation Grant Deed from Levitt and Sons of California Inc.Re:Dyer Road Trunk 1 04/14/71 71-46-5 Authorizing Acceptance of Easement from The Irvine Company in connection with Sewer Trunk “B”-Unit 7,Upper Newport Bay Crossing,Contract No.5-18 5 04/14/71 7 1-47-3 Approving plans and specs for Beach Relief Trunk Sewer,Reaches 17,18 &19,from Rostrata Ave.,to Rosecrans Ave.,Contract No.3-16 3 04/14/71 71-48-7 Awarding contract for Contract No.7-6-2 Sunflower Interceptor,Reach 2,from Bear St.to Main St.to Ernest E.Pestana,Inc.-total of $1,278,238.00 7 04/14/71 7 1-49-7 Authorizing acceptance of Grant of easement from Irvine Industrial Complex in connection with extension of McGaw Ave.Sewer from Von Karman to Flood Control Channel 7 04/14/71 7 1-50-7 Authorizing acceptance of Grant Deed from Irvine Industrial Complex in connection with sanitary sewer requirements between Red Hill Avenue and Orange County Airport 7 04/14/71