Loading...
HomeMy WebLinkAboutResolution 1966 - 0034RESOLUTION NO.66_3L1._2 AUTHORIZING MODIFICATION #1 TO REPORT A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY SANITATION DISTRICT NO.2,OF ORANGE COUNTY,CALIFORNIA,AIVIENDING AND MODIFYING ENGINEER’S REPORT DATED JULY, 1965 (Modification #1) The Board of Directors of County Sanitation District No.2, of Orange County,California, DOES HEREBY RESOLVE,DETERMINE AND ORDER: Section 1 That J.R.Lester Boyle and Sidney L.Lowry,Con sulting Engineers,have prepared a modification of the Engineer’s Report dated July,1965,and adopted August 11,1965,to provide for construction of alternate facilities in the vicinity of the East Fullerton Darn;and, Section 2 That the Board of Directors of County Sanitation District No.2 does hereby find and determine that the public interest requires a modification or departure from the plans and specifications as contained in the Engineer’s Report dated July, 1965,in the manner set forth on the attached sheet which is hereby made a part of this resolution,all in accordance with Section 1~758 of the Health and Safety Code of the State of California. MODIFICATION NO.I TO ENGINEERS’REPORT FOR COUNTY SANITATION DISTRICT NO.2 Dated July 1965 (RESOLUTION NO.66—34-2) SECTION 2 Construction The first paragraph on page 5 is hereby modified to read as follows: Construct the Rolling Hills Drive Pump Station at Rolling Hills Drive,and the Brea-Fullerton Sub-trunk Sewer and the Rolling Hills Drive Force Main and Sub-trunk Sewer extending easterly along Rolling Hills Drive and its easterly extension to a point approximately 470 feet east of State College Boulevard;thence southeasterly and southerly through the forebay of the Fullerton Dam;thence through a bore near the east end of the Fullerton Dam;thence continuing southerly to Associated Road;thence southerly in Associated Road to Yorba Linda Boulevard;thence westerly in Yorba Linda Boulevard to a connection with the existing Cypress Avenue Sub—trunk Sewer. The last paragraph on page 5,and continuing on to page 6,is hereby modified to read as follows: Construction of the Rolling Hills Drive Force Main and Sub-trunk would consist of approximately 1400 L.F.of 18-inch A.C.P.force main between the pump station and a high point in Rolling Hills Drive 1400 feet,more or less,east, and 2530 L.F.of 15—inch V.C.P.;300 L.F.of 18—inch V,C.P., and 5015 L.F.of 24-inch V.C.P.sub-trunk sewer,together with required manholes and other appurtenances including a bore of 305 L.F.through the Fullerton Dam. SECTION The third paragraph on page 8 is modified to read as follows: Plate C-M shows the general aligrunent,size and type of the proposed Rolling Hills Drive Pump Station,Force Main and Sub-trunk Sewer construction as provided in Modification No.I to the Engineers’Report dated July 1965. SECTION 4 The second paragraph on page 10 is modified to read as follows: The Rolling Hills Drive Pump Station,Force Main and Sub-Trunk will be entirely within public right of way or Federal property and there is no property to be acquired nor should there be any property damaged in construction of this work,however,the pump station and a short section of the force main will be in right of way not within a public street but held by the City of Fullerton,arid a non-exclusive grant or assignment should be given by the City to the Sanitation District for use in construction of this work. SECTION 3 The first paragraph on page 13 Is modified to read as follows: Plate C-M shows the general alignment,size and type of the proposed Rolling Hills Drive Pump Station,Force Main and Sub-Trunk Sewer construction as provided in Modification No.I to the Engineers’Report dated July 1965. SECTION 6 The first paragraph on page 15 is modified to read as follows: The Rolling Hills Drive Pump Station proposed would have an ultimate capacity of 6.0 mgd with an increasing capacity of the sub-trunk to care for tributary flows along its route. The force main section would extend from the proposed Pump Station at the Brea-Fullerton sub-trunk to a high point in Rolling Hills Drive approximately 114.OO feet east arid would con sist of 1LI.OO L.F.of 18-inch A.C.P.The gravity section would extend from the high point in Rolling Hills Drive to a connec tion with the Cypress Avenue Sub-Trunk In Yorba Linda Boulevard near Associated Road and would consist of 2530 L.F.of 15-inch V.C.P.,300 L.F.of 18-inch V.C.P.and 5015 L.F.of 2Li~_inch V.C.P.,together with manholes and other appurtenances.Esti mated cost of these facilities is shown in Table 5—M and totals $340,500.00. Table 5 in Section 6 is modified to read as follows: Pump Station to high point in Rolling Hills Dr. 1400 ft.east TABLE 5-M ULTIMATE FLOWS AND COSTS ROLLING HILLS DRIVE PUMP STATION and ROLLING HILLS FORCE MAIN AND SUB-TRUNK SEWER Force Ma in High Point in Rolling Hills Dr. To Cypress Ave. Sub-trunk in Yorba Linda Blvd. Thru Fullerton Dam Sub-trunk 2530 300 5015 Bore Manholes 210 V.F. 6.0 15 VCP 18 VCP 8.5 24 VCP 40,500.00 5,400.00 125,400.00 36,600.00 I ~ Rolling Hills Dr. at Maple Ave. Construc— t ion Type Pump Stat ion Design Length Flow Feet _ ——6.0 Dia. Inches ______ Total Cost —-$100,000.00 1400 6.0 18 ACP 24,200.00 Sub-Trunk Sewer 305 Casing 42 only Steel --48 8,400.00 TOTAL --$340,500.00 STATE OF CALIFORNIA sS. COUNTY OF ORANGE I,FRED A.HP~RPER,Secretary of the Board of Directors of County Sanitation District No.2 , of Orange County,Cali fornia,do hereby certify that the above and foregoing Resolution No.66~314~2 was regularly passed and adopted at a regular meeting of said Board on the 13th day of April i~66,by the following vote,to wit: AYES:Directors Parks,Callens,Cornwell,Crapo, Culver,Harvey,Hock,Schutte,Speer, Workman and Allen NOES:NONE ABSENT:NONE IN WITNESS WHEREOF,I have hereunto set my hand and affixea the official seal of County Sanitation District No.2 , of Orange County,California,this 13th day of April ,1966. ~ Fred A.Harper,Secretary, Board of Directors of County Sanitation District No.2 , of Orange County, California