Loading...
HomeMy WebLinkAbout1962 Resolution Index 0001-01001962 RESOLUTIONS ~ID~~i i~i~t :~:~~Dàf~:~~i: 62-01 Accepting as completed the Asphalt Concrete Paving at Plant No.1;and authorizing filing of Notice of Completion All 01 /1 0/62 62-02 Awarding contract for Job P2-5A for purchase of Two, 200 hp Vertical Electric Motors,Switch Gear and Shafts, Job No.P2-5A to Fairbanks Morse &Co. All 01/10/62 62-03 Approving specifications for Centrifugal Clutches for Stationary Engines All 01 /1 0/62 62-04 Approving specifications for Power Wagon Truck;and authorizing District No.I to award All 01/10/62 62-05 Approving specifications for Sludge Line Addition to treatment Plant No.1,and for Repair of Digester A Dome at Treatment Plant No.2 All 01 /1 0/62 62-06-7 Quitclaim of permanent easement to owners of property (Segerstrom)to correct error in acquisition of RO for Gisler-Red Hill Trunk,Contract No.7-1 7 01 /1 0/62 62-07-7 Accepting Fairview Sub-Trunk Sewer as complete 7 01/10/62 62-08-2 Ratifying “Agreement for Settlement of Contract” No.2-4 (Cypress Avenue Sub-Trunk Sewer)Between District No.2 and N.P.Van Valkenburgh Company,Inc. 2 01/10/62 62-09-2 Accepting easement from California,Arizona and Santa Fe Railway Co.in connection with Contract No.2-7, (Santa Fe Lane Improvements Co.,defendant) 2 01/10/62 62-10 Resolution adopted in memory of Braden Finch,former Director All 01/10/62 62-11-1 Award of purchase of Power Wagon Truck to L.D. Coffing (A-005) 1 01/29/62 62-12-1 Awarding contract to Weardco Construction Corporation for construction of Steam Station,Incineration,Tunnels and Miscellaneous Improvements at Plant No.2,Job No.P2-4 1 01/29/62 62-13-1 Award of Sludge Line Attrition to Treatment Plant No.1 to Fewell Concrete Pipe Company (Spec.No.PW-006) 1 01/29/62 62-14-1 Award of Centrifugal Clutch for Stationary Engine to Waukesha Motor Company (E-008) 1 01/29/62 62-15-1 Awarding Contract for Repair of Digester “A”Dome;and authorizing Execution of Contract for said work - Contract to Johnson Western Gunite Co.(PW-007) 1 01/29/62 62-16-7 Canvass of returns of Special Bond Election held January23,1962 7 01/29/62 62-17 Approving and adoption plans for Job No.P1-6, Electrical Remodeling at Plant No.1,Job No.P1-6;and authorizing District No.I to receive bids and to award contract All 02114162 62-18 Accepting as completed the Vertical Lift Doors at Joint Chlorination Station (Spec.No.PW-003) All 02/14/62 62-19-7 Providing for Issuance of Bonds and Fixing date of sale thereof 7 02/14/62 62-20-6 Accepting easement from County of Orange Right of Way Department 6 02/14/62 62-21-7 Employing Boyle and Lowry,for preparation of a Master Plan of subtrunks for the southern portion of the District 7 02/28/96 62-22 -VOID- 62-23 -VOID- 62-24 -VOID- 62-25 -VOID- 62-26 -VOID- 62-27 -VOID- 62-28 -VOID- 62-29 Accepting as complete the Sludge Line Addition to Treatment Plant No.I on 2-29-62 All 03/14/96 62-30 Approving and adopting specifications for 4-door passenger automobile All 03/14/96 62-31-7 Approving and adopting plans and specs for Gisler-Red Hill Trunk Sewer,Contract 7-2 7 03/14/96 62-32-7 Employing Boyle and Lowry for design and preparation of plans and sub-trunks of the Districts 7 03/14/96 62-33 Determining prevailing wage rates All 03/14/96 62-34-5 Accepting proposal and employing engineers to review, update,and expand Engineer’s Report dated July,1959 5 03/14/96 62-35-1 Award of Contract No.P1-6 to Steiny and Mitchel,Inc. for Electrical Remodeling at Plant No.1,for $42,600. 1 03/28/62 62-36-7 Approving and adopting plans and specs for Lemon Heights Trunk Sewer,Contract No.7-3 and authorizing advertising for bids 7 03/28/62 62-37-1 Authorizing and directing filing of application for Federal Grant under USC 466 Et Seq.(Public Law 660,.84th Congress Agent for Districts 5 &6) 1 03/28/62 62-38-7 Awarding $3,700,000 bonds to Security First National Bank 7 03/28/62 62-39-1 Award of purchase of passenger car to Smith Motor Company,Garden Grove 1 03/28/62 62-40 Approving and adopting plans and specs for Sludge Centrifuge for Plant No.1,Job No.P1 -7A;and authorizing advertising for bids All 04/11/62 62-41 Approving and adopting plans and specs for Engine Drive Unit for Plant #2,and authorizing advertising for bids (P2-5B) All 04/11/62 62-42 Approving and adopting specifications for Raw Sewage Pump and Gear Reduction Units for Plant No.2 (P2-SC) All 04/11/62 62-43 Approving and adopting plans and specs for Clarifier Equipment for Plant No.2 (P2-5D) All 04/11/62 62-44-2 Approving Utility Agreement #UA62A3-13 with Orange County Flood Control District,providing for relocation of a 30”trunk sewer in Highland Ave.(Fullerton-Brea Trunk Sewer;and authorizing execution thereof) 2 04/11/62 62-45 -VOID- 62-46 -VOID- 62-47 Accepting as complete the Repair of Digester “A”Dome at Treatment Plant No.2;and authorizing filing of Notice of Completion All 04/11/62 62-48 Approving specifications for Dirt Fill at Plant No.2;and authorizing District No.I to receive bids and to award All 04/11/62 62-49-5 Approving plans and specs for the Corona del Mar Sewage Pumping Station;and authorizing The Irvine Company to proceed with the construction of said facility 5 04/11/62 62-50 Approving and adopting specifications for sandblasting All 04/11/62 of Digester “C”Dome at Plant No.2;and authorizing _______ advertisinq for bids and award contract by District No.1 62-51 Approving and adopting specifications for three 200 PPD Cabinet enclosed Chiorinators and authorizing advertising for bids for said equipment (Spec.No.E-10) All 04/11/62 62-52-11 Employing Boyle and Lowry,Consulting Engineers for preparations Engineer’s Report 11 04/11/62 62-53 Approving specifications for Sale of Scrap Metal;and authorizing District I to award sale thereof Specification No.S-001 All 04/11/62 62-54 -VOID- 62-55 Commendation resolution to retiring members Schweitzer,Fry and Kidd All 04/11/62 62-56-7 Approving and adopting plans and specs for the North Trunk Sewer,Contract No.7-4-1;and authorizing advertising for bids 7 04/13/62 62-57-7 Award of contract for the Gisler-Red Hill Trunk Sewer, Contract No.7-2 to Jack H.MacDonald Co.,Inc.,and authorizing execution of contract 7 04/13/62 62-58-7 Approving and authorizing execution of Purchase and Sale Agreement with C.J.Segerstrom and sons for purchase of the Fairview Sub-trunk Sewer by the Districts 7 04/25/62 62-59-7 Approving and authorizing execution of agreement with the County of Orange for Density Tests relative to compaction of backfill connected with installation of sewers within Public Rights of Way 7 04/25/62 62-60-1 Awarding purchase of Three 200 PPD Cabinet Enclosed Chlorinators to Fischer &Porter Co. (Specification No.E-010) 1 04/27/62 62-61 -1 Awarding sale of Scrap Metal to Steverson Brothers (Specification No.S-aol) 1 04/27/62 62-63 VOID 62-64 VOID 62-65 Approving and adopting plans and specs for installation of Control Facilities,Job J-5C All 05/09/62 62-66 Approving and adopting plans and specs for Asphalt Concrete Paving at Plant No.I All 05/09/62 62-67 Approving and authorizing execution of Agreement with Edison Company for Joint Use of Road (Supplemental Agreement) All 05/09/62 62-68 Accepting as complete the Control House,Job No.J- 5A,from L.A.Chapman,Contractor All 05/09/62 62-69 Amending Resolution No.931 as amended by Resolution No.949 which authorized the filing of condemnation for land at Treatment Plant No.2 All 05/09/62 62-70-7 Accepting Pipeline License Agreement from the Southern Pacific Company for a 12”sewer pipe line beneath its tracks and property at the rail crossing in Prospect Avenue just north of La Veta Ave.,in or near the City of Orange 7 05/09/62 62-71 VOID 62-72 VOID 62-73-1 Awarding Dirt Fill at Plant No.2 to Bay Sierra Construction and Equipment Co.,and authorizing execution of agreement by P.0.And Sec. 1 05/11/62 62-74-7 Award of Contract 7-4-1 to Bosko Construction Co.,and authorizing execution thereof 7 05/25/62 62-75-1 Award of Contract for Job P1-7A to Bird Machine Co., and authorizing execution thereof 1 05/25/62 62-76-1 Award of Job P2-5B to Waukesha Motor Co.1 05/25/62 62-77 VOID 62-78-1 Awarding purchase of Clarifier Equipment for Plant No. 2,Job No.P2-5D to Process Engineers 1 05/25/62 62-79-1 Awarding contract for Asphalt Concrete Paving Additions at Treatment Plant No.I to Sully Miller Contracting Company 1 05/25/62 62-80 VOID 62-81-7 Approving and adopting plans and specs for portions of the North Trunk and West Trunk,Contract 7-4-2,and authorizing advertising for bids for said work. 7 05/25/62 62-82 VOID 62-83 Award of purchase of chlorine to Chemical Exchange Company Division of Jones Chemical,Inc. All 06/13/62 62-84-11 Approving annexation #5 (Huntington Harbour Corporation) 11 06/13/62 62-85-1 Award of contract to ETS-HOKIN &GALVIN,for installation of control facilities,Job J-5C 1 06/13/62 62-86-7 Authorizing Modification #1 to the Engineer’s Report dated November,1961 to provide rerouting of the North Trunk Sewer 7 06/20/62 62-87-7 Approving specifications for one,12”Magnetic Sewage Meter and authorizing advertising for bids for said purchase 7 06127162 62-88 Approving specifications for Raw Sewage Pumps and Gear Reduction Unit for Plant No.2,Job P2-5C (Rebid) All 07/11/62 62-89 Approving plans and specs for Headworks No.2,Sed. Basins 6 and 7,Digesters F,G &H,Job P2-5 All 07/11/62 62-90 Approving plans and specs for Pumps,Drives and Motors,Job J-6A and advertising for bids pursuant to provisions of Resolution 884 All 07/11/62 62-91 Approving specs for Bar Screens and Belt Conveyor, Job J-6B and Advertising for bids pursuant to provisions of Resolution 884 All 07/11/62 62-92 Approving specifications for 72”Propeller Meter,Job J- 6C and Advertising for bids pursuant to provisions of Resolution 884 All 07/11/62 62-93 Approving specs for Single Circuit 5000 KVA Substation,Job J-6D and Advertising for bids pursuant to provisions of Resolution 884 All 07/11/62 62-94 Approving specs for 2400 Volt Motor Control Center, JobJ-6E All 07/11/62 62-95 Accepting as complete Dirt Fill at Plant No.2 (BAY SIERRA CONSTRUCTION AND EQUIPMENT,CO.) All 07/11/62 62-96 Accepting as complete the Asphalt Concrete Paving Additions at Plant No.I (SULLY MILLER CONTRACTING CO.)Specification No.PW-010 All 07/11/62 62-97 Accepting as complete Job P1-5 for construction of Digester #6 and Miscellaneous Improvements (DANIELS CONSTRUCTION CO.)At Plant No.I All 07/11/62 62-98 Amending Resolution 942 (positions and salaries)as amended,establishing employee positions and fixing salaries therefor All 07/11/62 62-99-7 Award of contract 7-4-2 to J.P.S.CONTRACTING CO., INC.For construction of portions of the North Trunk Sewer and West Trunk Sewer 7 07/18/62 62-100 Awarding purchase of One,12”Magnetic Sewer Meter All 07/18/62 (Specification No.E-015)to FISCHER &PORTER