Loading...
HomeMy WebLinkAbout1961 Resolution Index 0909-0950901-7 ~p Con ul nt 11—9—60 .7 902—3 Accepting easement from Standard Oil Company of California (at no cost to District )Contract 3—)4C 11—9—60 3 903—7 Accepting proposal of Stone & Youngberg,Municipal Financing Consultants for Report (to be submitted by 3-1-61)and other services in the event a bond pro position is approved by the voters in the District;and authorizing execution of Agreement 11—23—60 7 90)4—6 Authorizing application to the Secretary of He~h,Education and Welfare for approval of Lease Agreement between District 6 and the Costa Mesa Sanitary District 11—23—60 6 905-all Approving Grant of Easement to Sakiokas for underground irriga tion pipeline purposes by District No.1 (#81981 M.O.)12—1)4—60 all 906—3 Approving and authorizing execution of Utility Agreement UA60C5—20 with the Orange County Flood Control (Contract 3—2)12—1)4—60 3 907—all Amending Resolution No.836 as amended by addition thereto of position of Con~truction Inspector 12—1)4—60 all 908 Approving and authorizing execution of Basic Accommodation Agreement between Districts 3 and 11 12—1)4—60 3 &11 909—8 Amending Resolution No.836 as amended by addition of position of Construction Inspector 1—11—61 8 910—3 Accepting as completed the con struction of Contract 3—6;and authorizing filing of Notice of Completion of Work 1—11—61 3 911—3 Ac pt ,~comp1~e4 the con— st ct r)~Vof)Co/1tr~.ct)3_9;and auth r zfrx/fi~in~ø-f Notice of Compi tibri of 4~orI(1—11—61 3 912—all Approving and adopting plans and specifications for ~gine Drive Unit and Booster Pumping Unit (J—3A)1—11—61 all 913—7 A thor ~eçec~t~ion of Notice of C et on/Jo n ly with The Ir e C pa~y o College Ave. Pump Station an Force Main 1—11—61 7 914—7 Determining outstanding indebtedness and effect of proposed withdrawal of territory on the District 1—20—61 7 915—7 Accepting easement with Flood Control 1—20—61 7 916—all Authorizing Modification to Engineer’s Report adopted July 8, 1959 (Master Plan)to provide for building construction at Plant 1.2—8—61 all 917—3 Accepting as completed the con struction of Contract 3—9;and authorizing filing of Notice of Completion of Work 2—8—61 3 918—6 Accepting Consent Instrument from Secretary of Health,Education and - Welfare,and authorizing execution and recordation thereof 2—8—61 6 919—5 Authorizing condemnation for acqui sition of pumping station site 2—8—61 5 920—7 Authorizing execution of Sale and Purchase Agreement with The Irvine Company re:Gisler,MacArthur and College Avenue Thunlcs 2—8—61 7 921—11 Accepting proposal and directing the Engineers to prepare Engineering Report 2—8—61 11 922—2 Accepting as completed the con struction of Contract 2—7,and authorizing filing of Notice of Completion of Work 2—~3—bl 2 .923—2 Accepting as completed the con struction of Contract 2—9,and authorizing filing of Notice of Completion of Work 2—23—61 2 924—3 - ~nploying Engineers and d&r~ecting said Engineers to prepan~e Report (Boyle and Lowry)2-23-61 3 925—2 Enploying Engineers and directing said Engineers to ~repare Engineer ing Report (Boyle and Lowry)2.~3—~l 2 926—ali Amending Resolution 836 (positthdins and salaries)as amended (Dist.8 adopted on 4—12)3—8—61 all 927 Authorizing amendment to contract with Carollo dated 2—11—59 3—8—61 all 928 Authorizing Dist.1 to enter into Agree ment with Producing Prop.,Inc.for restric tions of surface rights 3—8—61 all 929—2 Accepting as completed the construction of contract No.2—4 and authorizing filing of Notice of Completion of Work 3—8—61 2 930-7 Authorizing amendment to contract with The Irvine Company 3—8-61 7 931 Condemnation of land at Plant #2 (Amended by 949 on 5_l0—6l)(’~fl2Et/Dk.~!~y ~~~/~,‘/~)3—8—61 all 932-7 Accepting proposal &directing Engineers to prepare Engineering Report 3—22—61 7 933—8 (Same as 926)Other Districts adopted (amending positions and salaries)4—12—61 8 934—li Engineer’s Report received and ordered filed —time and place for public hearing set 4—12—61 11 935-3 Accepting Easement Deed from Orange County Flood Control (in compliance with Utility Agreement dated Dec.14,1960)and autho rizing recordation thereof -4—12—61 3 Del --“~-~--~/°~-‘~—2~- 9361 ~~set ‘61 ~ s t 938—7 Engineer’s Report received and ordered filed;time and place for pub1~Lc hearing set 4—19—61 7 939 Approving and adopting plans and speci fications for building construction at Plant No.1;and authorizing Dist.1 to receive bids and award contract.(P1—4)4—12—61 all 940—3 Accepting as completed the construction of Contract 3—8;and authorizing filing of Notice of Completion of Work 4—12—61 3 941—3 Authorizing execution of Agreement with Dorfman Constr.Co.,regarding payment to contractor in connection with Contract No.3—8 4—12—61 3 9~2 .~~Establishing employee positions and fixing ~salaries therefor;and a~tbprtzing employ ~ment of personnel ~~/5—10—61 all 943-11 Overruling protests and adopting Engineer’s Report as madw 4—28—61 11 9)44-1 Approving and authorizing exeaution of Utility Relocation Agreement No. UA61F2—15 for reconstruction work to be done by Flood Control’s contractor 5—10—61 1 9145_7 Overruling all protests to ~g1neerts Report dated April,l96l~and adopting said report as made 5—3—61 7 9)46—1 Granting easement to Edison Co.(1 as agent)5—10—61 1 947 Resolution of Intention (S.E.R.S.)5—10—61 all 9148 Pme~d~r~~ol ti~~,o ~ng n (~fJ4~:5’1O61 all 949 Pjriending Resolution 931 (Condemnation of land at Plants)~~5—10—61 all ~ 950-1 Awardin~contract for construction of Job P1—14 (buildings at plant)to harris &Denner;and authorizing Chairman and Secretary to execute 5—19—61 1