HomeMy WebLinkAboutResolution 1953 - 0262-1,2, 6, and 7RESOLUTION NO.a62-i
A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY
SPNITPTION DISTRICTS NOS.1-2-6-7 OF ORANGE COUNTY,
CALIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS,
DET~ILED INSPECTION,SUPERVISION !ND MATERIAL TESTS
ON THE CONSTRUCTION OF ELLIS P VENUE TRUNK SEWER.
The Board of Directors of County Sanitation District No.1
of Orange County,California,resolves as f0110w8:
WHEREAS:The Districts do require construction Surveya,
detailed inspection,supervision and material tests in connection
with the construction of Ellis Avenue Trunk Sewer in accordance
with the plans and specifications submitted by the Engineers,
Harrison and Woolley,Headman,Ferguson and Carollo and approved
by the Chief Engineer and General Manager and by the Districts by
Resolution No.p57,dated March 1953,.and
WHEREAS:The Engineers have submitted a proposal to do the
work which is reasonable and in the best interests,of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headman,
Ferguson and Carollo to perform the construction surveys,detailed
inspection and supervision including material tests on Ellis
Avenue Trunk Sewer in accordance with the plans and specifications
heretofore adopted by the Districts and to the satisfaction of the
Chief Engineer and General Manager of the Districts for a total
sum;equal to three and one half per cent (3~-%)of the terminal
‘zntract costs to be paid in four (J4)installments as follows:
1%of contract award once 30 days after contractor
has commenced work,and 1%each month thereafter until
3%has been paid.The balance of the total of 3*%
remaining to be paid 35 days after acceptance of work
by the Districts.
_____________
—
The foregoing resolution was passed and adopted at a regular
meeting of the Board of Directors of County Sanitation District
No.~,on the 25th day of $*rOh
,~1953.
~
_________
Secretary9 ~o~TFd ol’Di~ectors
County Sanit~ticn District No.I
Orange County,California
STATE OF CALIFORNIA)
55
CCUNTY OF ORANGE )
I,ORA MAE MERRITT,Secretary of the Board of Directors
of County Sanitation District No.I of Orange County,California,
do hereby certify that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitatipn District No.1.of Orange County,California,held on
the25th day of Kneb
,1953,by the following roll call
vote:
AYES:Dtreeton 3,L.$e*fl.d,,.Courtney B.CheMI.r
ad Willie B.Warner
NOES;Non.
ABSENT:None
IN WITNESS WHEREOF,I have hereunto set my hand and affixed
the seal of County Sanitation District No.~of Orange County,
California,this 25th day of *P#h
,1953.
~~1(~&2~~
Secretary,Board of Directors
County Sanitation District No.
Orange County,California
RESOLUTION NO.262.P
A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY
SANITPTION DISTRICTS NOS.1-2-6-7 OF ORANGE COUNTY,
CPLIFORNIL;PROVIDING FOR CONSTRUCTION SURVEYS,
DET~ILED INSPECTION,SUPERVISION AND MATERIAL TESTS
ON THE CONSTRUCTION OF ELLIS AVENUE TRUNK SEWER.
The Board of Directors of County Sanitation District No.~
of Orange County,California,resolves as follows:
WHEREAS:The Districts do require construction surveys,
detailed Inspection,supervision and material tests in connection
with the construction of Ellis Avenue Trunk Sewer in accordance
with the plans and specifications submitted by the EngIneers,~
Harrison and Woolley,Headman,Ferguson and Carollo and approved
by the Chief Engineer and General Manager and by the Districts by
Resolution NO.~7 ,dated March 1953,and
WHEREPS~The Engineers have submitted a proposal to do the
work which is reasonable and in the best interests of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headxnan,
Ferguson and Caro].lo to perform the construction surveys,detailed
inspection and supervision including material tests on Ellis
Avenue Trunk Sewer in accordance with the clans and specifications
*~eretofore adopted by the Districts and to the satj.sfaction of the
~$ef Engineer and General Manager of the Districts for a total
sum equal to three and one half per cent (3~%)of the terminal
~ntract costs to be paid in four (Z~)installments as follows:
1%of contract award price 30 days after contractor
has commenced work,and 1%each month thereafter until
3%has been paid.The balance of the total of 3~%
remaining to be paid 35 days after acceptance of work
by the Districts.
The foregoing resolution was passed and adopted at a regular
meeting of the Board of Directors of County Sanitation District
No.2
,on the 25th day of Marob
,1953.
~
__
Secretary,Board of Directors
County Sanitation District No.2
Orange County,California
STATE OF Ci:\LIFoianm)
ss
COUNTY OF O~W’~GE )
I,ORA iIAE LIs2RITT,Secretary of the Board of Directors of
County Sanitation District No.2 of Orange County,California,
do hereby certify that the foregoing Resolution was passed and
adopted at a re~~ular meeting of the Board of Directors of County
Sanitation District No.2 of Orange County,Californiz~,held on
the 25th day of March
*,1953,by the following roil call
vote:
AYES:Directors W~Rasson,Fr&nk 4,Soiveitaer,Jr.,
Oh~&rlen S.Sta*ens,Willis H~Warner,Wtli1ari~TI,.
litrntoin and ltobert H,.Soney
NOES:Nons
ABS ENT:Director ffr~ch ~4 W*rden
IN VaTNESS WHEREOF,I have hereunto set my hand and affixed
the seal of County Sanitation District No.
2
of O~~nge County,
California,this 25t1ay of
,1953.
~~cO~/~~
Sedretary,Bdard of Directors
County Sanitation District No.2
Orange County,California
RESOLUTION NO,Q6Q-6
t~RESOLUTION OF THE BOP.RD OF DIRECTORS OF COUNTY
SPNITPTION DISTRICTS NOS.1-2-6-7 OF ORPNGE COUNTY,
CPLIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS,
DETP.ILED INSPECTION,SUPERVISION P~ND WTERIAL TESTS
ON THE CONSTRUCTION OF ELLIS AVENUE TRUNK SE1~TER.
The Board of Directors of County Sanitation District No.6
of Orange County,California,resolves as follows:
WHEREAS:The Districts do require construction surveys,
detailed inspection,supervision and material tests in connection
with the construction of Ellis Avenue Trunk Sewer in accordance
with the plans and specifications submitted by the Engineers,
Harrison and Woolley,Headman,Ferguson and Carollo and approved
by the Chief Engineer and General Manager and by the Districts by
Resolution No.*57~,dated March 1953,and
WHEREAS:The Engineers have submitted a proposal to do the
work which is reasonable and in the best interests of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headman,
Ferguson and Carollo to perform the construction Surveys,detailed
inspection and supervision including material tests on Ellis
Avenue Trunk Sewer in accordance with the !Dlane and specifications
heretofore adopted by the Districts and to the satisfaction of the
Chief Engineer and General Manager of the Districts for a total
sum equal to three and one half per cent (3~-%)of the terminal
•~:ntract costa to be paid in four (i4)installments as follows:
1%of contract award once 30 days after contractor
has commenced work,and 1%each month thereafter until
3%has been paid.The balance of the total of 3~%
remaining to be paid 35 days after acceptance of work
by the DistrictB.
The foregoing resolution was passed.and adopted at a regular
meeting of the Board of Directors of County Sanitation District
No,6 on the 25th day of M~th
,1953.
~~?~-~
Secretary,Board of Directors
County Sanitation District No.6
Orange County,California
STATE OF Ci~LLIFORNIa)
ss
C C;UN TY cY O~N GE
I,ORA ~JIE i~RRITT,Secretary of the Board of Directors of
County Sanitation District No.
.
of Orange County,California,
do hereby certify that the foregoinr~,Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.6 of Oran~e County,Californi~.,held on
the 2~th day of ~rCh
,1953,by the following roll call
vot e:
AYES:Directors W1U1~H.W~nier,~r*den ~thch and
A.H.$ey’ers
NOES:None
ABS ENT:None
IN ~TNt~iS WHEREOF,I have hereunto set my hand and affixed
tne seal of County Sanitation District No,6 of Or~’.n~e County,
California,this 25thday of Nai~ch
,1953.
Secrei~àry,Board of Directo~s
County Sanitation District Mo.6
Oran~e County,California
RESOLUTION NO.262-7
t~RESOLUTION OF THE BOPRD OF DIRECTORS OF COUNTY
Sf~NITrTION DISTRICTS NOS.1-2-6-7 OF ORPNGE COUNTY,
CPLIFORNIf~PROVIDING FOR CONSTRUCTION SURVEYS,
DETPILED INSPECTION,SUPERVISION f-ND MPTERIAL TESTS
ON THE CONSTRUCTION OF ELLIS PVENUE TRUNK SEVER.
The Board of Directors of County Sanitation District No.7
of Orange County,California,resolves as follows:
WHEREPS:The Districts do require construction surveys,
detailed inspection,supervision and material tests In connection
with the construction of Ellis J\venue Trunk Sewer in accordance
with the plans and specifications submitted by the Engineers,
Harrison and Woolley,Headman,Ferguson and Carollo and approved
by the Chief Engineer and General Manager and by the Districts by
Resolution No.~dated March 1953,and
WHEREPS~The Engineers have submitted a proposal to do the
work which is reasonable and In the best interests of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headman,
Ferguson and Carollo to perform the construction surveys,detailed
inspection and Supervision Including material tests on Ellis
AvenuéTrunkSewer in accordance with the plans and specifications
heretofore adopted by the Districts and to the satisfaction of the
Chief Engineer and General Manager of the Districts for a total
sum equal to three and one half per cent (3~%)of the terminal
~:ntract costs to be paid In four (Li)installments as follows:
1%of contract award once 30 days after contractor
has commenced work,and 1%each month thereafter until
3%has been paid.The balance of the total of 3~%
remaining to be paid 35 days after acceptance of work
by the Districts.
The foregoing resolution was passed and adopted at a regular
meeting of the Board of Directors of County Sanitation District
No.7 ,
on the 25th day of March ,1953.
~~~
Secretary,Board~fl5~r~tors
County Sanitation District No.7
Oran~,e County,Califprnia
STATE OF C±J~IFORUIi~)
ss
COUNTY OF Oit~NGE
I,ORA iJ~E i:i~RRITT,Secretary of the Board of Directors of
County Sanitation District No.7 of Orange County,Ca1ifornia~
do hereby certify that the foregoin~,1~eso1ut~on was passed and
adopted at a re~~uiar meeting of the Board of Directors of Count~r
Sanitation District No.7 of Oran~e County,Californic.,held on
the 25th day of March ,1953,by the fo11owIn~,r9ll call
vat e:
AYES:Directors J L.McBride,W11118 H.Warner and
Vincent L.Humeston
NOES:None
None
IN WITN..~JS WHEF.~OF,I have hereunto set my hand and affixed
tL’ie seal of County Sanii;ation Di~tr~ct No~7 of Ornn:e County,
California,this 25th day of March.,l953~
~
Secret.’ary,~Boe’ird of Directors
County Sanitation District No.7
Orsn~e County,California