Loading...
HomeMy WebLinkAboutResolution 1953 - 0262-1,2, 6, and 7RESOLUTION NO.a62-i A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY SPNITPTION DISTRICTS NOS.1-2-6-7 OF ORANGE COUNTY, CALIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS, DET~ILED INSPECTION,SUPERVISION !ND MATERIAL TESTS ON THE CONSTRUCTION OF ELLIS P VENUE TRUNK SEWER. The Board of Directors of County Sanitation District No.1 of Orange County,California,resolves as f0110w8: WHEREAS:The Districts do require construction Surveya, detailed inspection,supervision and material tests in connection with the construction of Ellis Avenue Trunk Sewer in accordance with the plans and specifications submitted by the Engineers, Harrison and Woolley,Headman,Ferguson and Carollo and approved by the Chief Engineer and General Manager and by the Districts by Resolution No.p57,dated March 1953,.and WHEREAS:The Engineers have submitted a proposal to do the work which is reasonable and in the best interests,of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headman, Ferguson and Carollo to perform the construction surveys,detailed inspection and supervision including material tests on Ellis Avenue Trunk Sewer in accordance with the plans and specifications heretofore adopted by the Districts and to the satisfaction of the Chief Engineer and General Manager of the Districts for a total sum;equal to three and one half per cent (3~-%)of the terminal ‘zntract costs to be paid in four (J4)installments as follows: 1%of contract award once 30 days after contractor has commenced work,and 1%each month thereafter until 3%has been paid.The balance of the total of 3*% remaining to be paid 35 days after acceptance of work by the Districts. _____________ — The foregoing resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No.~,on the 25th day of $*rOh ,~1953. ~ _________ Secretary9 ~o~TFd ol’Di~ectors County Sanit~ticn District No.I Orange County,California STATE OF CALIFORNIA) 55 CCUNTY OF ORANGE ) I,ORA MAE MERRITT,Secretary of the Board of Directors of County Sanitation District No.I of Orange County,California, do hereby certify that the foregoing Resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitatipn District No.1.of Orange County,California,held on the25th day of Kneb ,1953,by the following roll call vote: AYES:Dtreeton 3,L.$e*fl.d,,.Courtney B.CheMI.r ad Willie B.Warner NOES;Non. ABSENT:None IN WITNESS WHEREOF,I have hereunto set my hand and affixed the seal of County Sanitation District No.~of Orange County, California,this 25th day of *P#h ,1953. ~~1(~&2~~ Secretary,Board of Directors County Sanitation District No. Orange County,California RESOLUTION NO.262.P A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY SANITPTION DISTRICTS NOS.1-2-6-7 OF ORANGE COUNTY, CPLIFORNIL;PROVIDING FOR CONSTRUCTION SURVEYS, DET~ILED INSPECTION,SUPERVISION AND MATERIAL TESTS ON THE CONSTRUCTION OF ELLIS AVENUE TRUNK SEWER. The Board of Directors of County Sanitation District No.~ of Orange County,California,resolves as follows: WHEREAS:The Districts do require construction surveys, detailed Inspection,supervision and material tests in connection with the construction of Ellis Avenue Trunk Sewer in accordance with the plans and specifications submitted by the EngIneers,~ Harrison and Woolley,Headman,Ferguson and Carollo and approved by the Chief Engineer and General Manager and by the Districts by Resolution NO.~7 ,dated March 1953,and WHEREPS~The Engineers have submitted a proposal to do the work which is reasonable and in the best interests of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headxnan, Ferguson and Caro].lo to perform the construction surveys,detailed inspection and supervision including material tests on Ellis Avenue Trunk Sewer in accordance with the clans and specifications *~eretofore adopted by the Districts and to the satj.sfaction of the ~$ef Engineer and General Manager of the Districts for a total sum equal to three and one half per cent (3~%)of the terminal ~ntract costs to be paid in four (Z~)installments as follows: 1%of contract award price 30 days after contractor has commenced work,and 1%each month thereafter until 3%has been paid.The balance of the total of 3~% remaining to be paid 35 days after acceptance of work by the Districts. The foregoing resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No.2 ,on the 25th day of Marob ,1953. ~ __ Secretary,Board of Directors County Sanitation District No.2 Orange County,California STATE OF Ci:\LIFoianm) ss COUNTY OF O~W’~GE ) I,ORA iIAE LIs2RITT,Secretary of the Board of Directors of County Sanitation District No.2 of Orange County,California, do hereby certify that the foregoing Resolution was passed and adopted at a re~~ular meeting of the Board of Directors of County Sanitation District No.2 of Orange County,Californiz~,held on the 25th day of March *,1953,by the following roil call vote: AYES:Directors W~Rasson,Fr&nk 4,Soiveitaer,Jr., Oh~&rlen S.Sta*ens,Willis H~Warner,Wtli1ari~TI,. litrntoin and ltobert H,.Soney NOES:Nons ABS ENT:Director ffr~ch ~4 W*rden IN VaTNESS WHEREOF,I have hereunto set my hand and affixed the seal of County Sanitation District No. 2 of O~~nge County, California,this 25t1ay of ,1953. ~~cO~/~~ Sedretary,Bdard of Directors County Sanitation District No.2 Orange County,California RESOLUTION NO,Q6Q-6 t~RESOLUTION OF THE BOP.RD OF DIRECTORS OF COUNTY SPNITPTION DISTRICTS NOS.1-2-6-7 OF ORPNGE COUNTY, CPLIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS, DETP.ILED INSPECTION,SUPERVISION P~ND WTERIAL TESTS ON THE CONSTRUCTION OF ELLIS AVENUE TRUNK SE1~TER. The Board of Directors of County Sanitation District No.6 of Orange County,California,resolves as follows: WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests in connection with the construction of Ellis Avenue Trunk Sewer in accordance with the plans and specifications submitted by the Engineers, Harrison and Woolley,Headman,Ferguson and Carollo and approved by the Chief Engineer and General Manager and by the Districts by Resolution No.*57~,dated March 1953,and WHEREAS:The Engineers have submitted a proposal to do the work which is reasonable and in the best interests of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headman, Ferguson and Carollo to perform the construction Surveys,detailed inspection and supervision including material tests on Ellis Avenue Trunk Sewer in accordance with the !Dlane and specifications heretofore adopted by the Districts and to the satisfaction of the Chief Engineer and General Manager of the Districts for a total sum equal to three and one half per cent (3~-%)of the terminal •~:ntract costa to be paid in four (i4)installments as follows: 1%of contract award once 30 days after contractor has commenced work,and 1%each month thereafter until 3%has been paid.The balance of the total of 3~% remaining to be paid 35 days after acceptance of work by the DistrictB. The foregoing resolution was passed.and adopted at a regular meeting of the Board of Directors of County Sanitation District No,6 on the 25th day of M~th ,1953. ~~?~-~ Secretary,Board of Directors County Sanitation District No.6 Orange County,California STATE OF Ci~LLIFORNIa) ss C C;UN TY cY O~N GE I,ORA ~JIE i~RRITT,Secretary of the Board of Directors of County Sanitation District No. . of Orange County,California, do hereby certify that the foregoinr~,Resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No.6 of Oran~e County,Californi~.,held on the 2~th day of ~rCh ,1953,by the following roll call vot e: AYES:Directors W1U1~H.W~nier,~r*den ~thch and A.H.$ey’ers NOES:None ABS ENT:None IN ~TNt~iS WHEREOF,I have hereunto set my hand and affixed tne seal of County Sanitation District No,6 of Or~’.n~e County, California,this 25thday of Nai~ch ,1953. Secrei~àry,Board of Directo~s County Sanitation District Mo.6 Oran~e County,California RESOLUTION NO.262-7 t~RESOLUTION OF THE BOPRD OF DIRECTORS OF COUNTY Sf~NITrTION DISTRICTS NOS.1-2-6-7 OF ORPNGE COUNTY, CPLIFORNIf~PROVIDING FOR CONSTRUCTION SURVEYS, DETPILED INSPECTION,SUPERVISION f-ND MPTERIAL TESTS ON THE CONSTRUCTION OF ELLIS PVENUE TRUNK SEVER. The Board of Directors of County Sanitation District No.7 of Orange County,California,resolves as follows: WHEREPS:The Districts do require construction surveys, detailed inspection,supervision and material tests In connection with the construction of Ellis J\venue Trunk Sewer in accordance with the plans and specifications submitted by the Engineers, Harrison and Woolley,Headman,Ferguson and Carollo and approved by the Chief Engineer and General Manager and by the Districts by Resolution No.~dated March 1953,and WHEREPS~The Engineers have submitted a proposal to do the work which is reasonable and In the best interests of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headman, Ferguson and Carollo to perform the construction surveys,detailed inspection and Supervision Including material tests on Ellis AvenuéTrunkSewer in accordance with the plans and specifications heretofore adopted by the Districts and to the satisfaction of the Chief Engineer and General Manager of the Districts for a total sum equal to three and one half per cent (3~%)of the terminal ~:ntract costs to be paid In four (Li)installments as follows: 1%of contract award once 30 days after contractor has commenced work,and 1%each month thereafter until 3%has been paid.The balance of the total of 3~% remaining to be paid 35 days after acceptance of work by the Districts. The foregoing resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No.7 , on the 25th day of March ,1953. ~~~ Secretary,Board~fl5~r~tors County Sanitation District No.7 Oran~,e County,Califprnia STATE OF C±J~IFORUIi~) ss COUNTY OF Oit~NGE I,ORA iJ~E i:i~RRITT,Secretary of the Board of Directors of County Sanitation District No.7 of Orange County,Ca1ifornia~ do hereby certify that the foregoin~,1~eso1ut~on was passed and adopted at a re~~uiar meeting of the Board of Directors of Count~r Sanitation District No.7 of Oran~e County,Californic.,held on the 25th day of March ,1953,by the fo11owIn~,r9ll call vat e: AYES:Directors J L.McBride,W11118 H.Warner and Vincent L.Humeston NOES:None None IN WITN..~JS WHEF.~OF,I have hereunto set my hand and affixed tL’ie seal of County Sanii;ation Di~tr~ct No~7 of Ornn:e County, California,this 25th day of March.,l953~ ~ Secret.’ary,~Boe’ird of Directors County Sanitation District No.7 Orsn~e County,California