HomeMy WebLinkAboutResolution 1953 - 0261-1, 2, 3, 6, 7, and 11RESOLUTION NO.261-I A RESOLUTION OF THE BOARD OF DIRECTORS OP COUNTY SANITATION DISTRICTS NOS.1-2-3-6-7 &11 OF ORANGE COUNTY,CALIFORNIP;PROVIDING FOR CONSTRUCTION SURVEYS,DET~ILED INSPECTION,SUPERVISION AND M.PTERIPL TESTS ON THE CONSTRUCTION OF BUSHARD STREET P ND TRE!.TMENT PLANT TRUNKS. The Board of Directors of County Sanitation District No.1 of Orange County,California,resolves as follows; WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests in connection with the construction of Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications submitted by the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo a~d approved by the Chief Engineer and General Manager and by the Die tricts by Resolution No.255 ,dated March 25,1953,and WHEREAS:The Engineers have submitted a proposal to do the work which Is reasonable and in the best Interests of the Districts and will expedite the afore mentioned construction, NOWTHEREPORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headman, Ferguson and Carollo to perform the construction surveys,detailed inspection and supervision including material tests on Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications heretofore adopted by the District and to the sat isfaction of’the Chief Engineer and General Manager of the Districts for,a total sum equal to three and one half per cent (3~%)of the terminal contract costs to be paid in seven (7)installments as follows: 1/2 of 1%of contract award price 30 days after contractor has commenced work,and 1/2 of 1%each month thereafter until 3%has been paid.The balance of total of 3~%to be paid 35 days after acceptance of work by the Districts. The foregoing resolution was passed arid adopted at a regular meeting of the Board of Directors of County Sanitation District No.I ,on the 25th day of March ,1953. ~~)/~ø//~~~ Secreta~3~Td of~Trrec to~ County ~8 t~icn Di~tf’~Ct No.1 Orange County,California STATE OF CALIFORNIA) ss CCUNTY OF ORANGE ) I,ORA MAE MERRITT,Secretary of the Board of Directors of County Sanitation District No.1 of Orange County,California, do hereby certify that the foregoing Resolution was passed and adopted at a regular meeting of the Board of~Directors of County Sanitation District No.1 of Orange County,California,held on the 25th day of March ,1953,by the following roll call vote: AYES:Directors 3.L.McBride,Courtney R.Chandler and Willis B.W&rner NOES:None ABSENT:None IN WITNESS WHEREOF,I have hereunto set my hand and affixed the seal of’County Sanitation District No.1 of Orange County, California,this 25th day of March ,1953. ~ Secretary,Board of Directors County Sanitation District No.1 Orange County,California RESOLUTION NO~2~1-2 A RESOLUTION OF ThE BOARD OF DIRECTORS OF COUNTY S~NITATION DISTRICTS NOS.1-2-3-6-7 &11 OF ORANGE COUNTY,CALIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS,DETAILED INSPECTION,SUPERVISION AND MATERI?L TESTS ON THE CONSTRUCTION OF ~USHARD STREET IND ThE!TMENT PLANT TRUNKS. The Board of Directors of County Sanitation District No.2 of Orange County,California,resolves as follows: WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests In connection with the construction of Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications submitted by the Engineers,Harriaon and Woolley,Headman,Ferguson and Carollo a~d approved by the Chief engineer and General Manager and by the Districts by Resolution No.2~,dated March25,1953,and WHEREAS;The Engineers have submitted a proposal to do the work which Is reasonable and in the best Interests of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headman, Ferguson and Carollo to perform the construction surveys,detailed inspection and supervision including material tests on Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications heretofore adopted by the Di8triot and to the sat isfaction of the Chief Engineer and General Manager of the Districts for a total sum equal to three and one half per cent (3~%)of the terminal contract costs to be paid in seven (7)installments as follows: 1/2 of 1%of contract award price 30 days after contractor has commenced work,and 1/2 of 1%each month thereafter until 3%has been paid.The balance of total of 3~%to be paid 35 days after acceptance of work by the Districts. The foregoing resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No,2 , on the day of ,1953. ~ __ Secretary,Board of Directors 2 County Sanitation District No. Orange County,California STATE CF CI’iIFCRNIi~) 55 COUNTY 02 C~AKGE I,ORA ~AE L~RRITT,Secretary of the Board of Directors of County Sanitation District 1•~o. 2 of Orange County,CaliJ.’ornia, do hereby certify that the foregoinc~Resolution was pass~and adopted at a re2:u.iar meeting of the Bodrd of Directors of County Sanitation District No.of Oran~e Countir,California,held on the ~day of ,1953,by the followinrr,roll call • vote: AYES:Directors De~W,H~son,?~n~~.Swt~z~Jr.~ Ch~tri~,~,at~ven~Willis H.Warner,Wi1lia~i ~ ~irst otti ar~d Robert W.&~r~ey NOES: ABS ENT:~~\~.Z’~~ Ii\T WIT~S WHEREOF,I have hereunto set my hand and affixed tne seal of CourLty Sanitation District No.2 of Orr~fl~e County, California,this ~5~ay of ,1953. Secretary,Bdard of ~irectors County Sanitation District No.2 Oran~e County,California RESOLUTION NO.251.3 A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY SPNITATION DISTRICTS NOS.1-2-3-6-7 &11 OF ORANGE COUNTY,CALIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS,DETAILED INSPECTION,SUPERVISION AND MPTERIPL TESTS ON THE CONSTRUCTION OF BUSHARD STREET A.ND TRE!TMENT PLANT TRUNKS. The Board of Directors of County Sanitation District No.3 of Orange County,California,resolves as follows: WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests In connection with the construction of Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications submitted by the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo a~d approved by the Chief Engineer and General Manager and by the Districts by Resolution No.255 ,dated March25 ,l953,and WHEREAS:The Engineers have submitted a proposal to do the work which Is reasonable and in the best interests of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headman, Ferguson and Carollo to perform the construction surveys,detailed Inspection and supervision including material tests on Bushard Street and Treatment Plant Trunks In accordance with the plans and specifications heretofore adopted by the District and to the sat-. isf’action of the Chief Engineer and General Manager of the Districts for a total sum equal to three and one half per cent (3~%)of the terminal contract costs to be paid in seven (7)installments as follows: 1/2 of’1%of contract award price 30 days after contractor has commenced work,and 1/2 of 1%each month thereafter until 3%has been paid.The balance of total of 3~%to be paid 35 days after acceptance of work by the Districts. The foregoing resolution was passed and adortecl at a regular meeting of the Board of Directors of County Sanitation District lo.on the 25th clay of March 1953. - ~ _ Secretary,Board of Directors County Sanitation District No. Orsnge County,California 3 STATE OF ~ ss CC.;UNTY c~O~NGE I,ORA ~AE hi~HITT,Secretary of the Board of Directors of County Sanitation District No.of Orane County,California, do hereby certify that the foregoir~Resolution was passed and adopted at a re7.u.lar meeting of the Board of Directors of County Sanitation.District No.of Oran~e County,Ca1iforni~.,held on the 25th day of Mb ,1953,by the following roil call vot e: AYES:Directors Nelson M.Launer,Willis H.Warner,C.R~ Miller,Joseph Webber,Robert H.Boney and Ch~r1es E,Stevens NOES: I’Tone ABSENT:Director Hugh W.Warden IN ~TI:H~S WH±~REOF,I have hereunto set my hand and affixed tae s~ai of County Sanitation District No.of Or~fl~e County, California,Ufli~5th day of March 1953. c~ __ Secretary,Board of Directors County Sanitation District No. Oran~e County,California 3 RESOLUTION NO.261-6 ~RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY Sf NITATION DISTRICTS NOS.1-2-3-6-7 &11 OF ORANGE COUNTY,CALIFORNIP;PROVIDING FOR CONSTRUCTION SURVEYS,DETAILED INSPECTION,SUPERVISION AND MPTERIL TESTS ON THE CONSTRUCTION OF BUSHARD STREET AND TREP TI4ENT PLANT TRUNKS. The Board of Directors of County Sanitation District No.6 of Orange County,California,reso].vesas follows: WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests in connection with the construction of Bushard Street and Treatment plant Trunks in accordance with the plans and specifications submitted by the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo aud approved by the Chief ~ngineer and General Manager and by the Districts by Resolution No.255 ,dated March 25~1953,and WHEREAS:The Engineers have submitted a proposal to do the work which is reasonable and In the best interests of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headman, Ferguson and Caro].lo to perform the construction surveys,detailed inspection and supervision including material tests on Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications heretofore adopted by the District and to the sat isfaction of the Chief Engineer and General Manager of the Districts for a total sum equal to three and one half per cent (3~%)of the terminal contract costs to be paid in seven (7)installments as follows: 1/2 of 1%of contract award price 30 days after contractor has commenced work,and 1/2 of 1%each month thereafter until 3%has been oaid.The balance of total of 3~%to be paid 35 dayg after acceptance of work by the Districts. The foregoing resolution was passed.and adopted at a regular meeting of the Board of Directors of County Sanitation District 6 25th March No. , on the day of ,1953. ~~ Secretary,Board of Directors 6 County Sanitation District No. Oran~,e County,California STATE OF Ci~IFCR~NIi~) ss COUNTY OF ORANGE ) I,ORA ~:AE ~.~R1u1rT,Secretary of the Board of Directors of 6 County Sanitation District No~.of Orange County,California, do hereby certify that the foregoin~’.Resolution was passed and adopted at a rer~ular meeting of the Bodrd of Directors of County 6 Sanitation District No.of Oranc~e Count’r,California,held on 25th March the day of ,1953,by the following roll call vat e: Willis H.Warner,Braden Finch and AYES:Directors A.if.Meyers None NOES: None ABSENT: IN T~TFL~S WHEREOF,I have hereunto set my hand and affixed 6 ttie seal of County Sanii:;ation District No.of Oran~e County, 25th March California,this day of ,1953. Secretary,Board of Dii’ectors 6 County Sanitation District No. Oran~e County,California RESOLUTION NO.#61-7 A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY St~NITATION DISTRICTS NOS.1-2-3-6-7 &13.OF ORANGE COUNTY,CALIFORNIP;PROVIDING FOR CONSTRUCTION SURVEYS,DETAILED INSPECTION,SUPERVISION I\ND MATERIPL TESTS ON THE CONSTRUCTION OF BUSRPRD STREET AND TREATMENT PLANT TRUNKS. The Board of Directors of County Sanitation District No.7 of Orange County,California,resolves as follows: WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests in connection with the construction of Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications submitted by the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo amd approved by the Chief ~ngineer and General Manager and by the Districts by Resolution No.255 ,dated March 25,1953,and WHEREAS;The Engineers have submitted a proposal to do the work which is reasonable and in the beat interests of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Wool]ey,Headman, Ferguson and Carollo to perform the construction surveys,detailed inspection and supervision Including material teats on Buahard Street and Treatment Plant Trunks in accordance w~.th the plans and specifications heretofore adopted by the District and to the sat isfaction of the Chief Engineer and General Manager of the Districts for a total sum equal to three and one half per cent (33~)of the terminal contract costs to be paid in seven (7)installments as follows: 1/2 of 1%of contract award price 30 days after contractor has commenced work,and 1/2 of 1%each month thereafter until 3%has been paid.The balance of total of 3~%to be paid 35 days after acceptance of work by the Districts. — The foregoing resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No. , on the25th day of March ,1953. ~~~22/~ Secretary,Board of Directors County Sanitation District No.7 Orange County,California STATE OF CAL IFORNIA) ss COUNTY (2 ORANGE I,ORA i:AE LjER1tITT,Secretary of the Board of Directors of County Sanitabicn District No.7 of Orange County,California, do hereby certify that the foregoing.Resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No.7 of Orange Count~,California,held on the 25th day of March ,1953,by the following roll call vot e: AYES:Directors 3,1..:McBrj~3c~,Willis ft Warner and Vincent L,fltaeeton NOES:None ABSENT:None IN WITNESS WHEREOF,I have hereunto set my hand and affixed the seal of County Sanitation District No.7 of Orante County, California,this 25thiay of March ,1953. ~pe ____ Sedretary,Board of Directors County Sanitation District No.7 Orange County,California RESOLUTION NO.261-11 A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY SANITATION DISTRICTS NOS.1-2-3-6-7 &1].OF ORANGE COUNTY,CALIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS,DETAILED INSPECTION,SUPERVISION AND MATERIAL TESTS ON THE CONSTRUCTION OF BUSHARD STREET AND TREATMENT PLANT TRUNKS. The Board of Directors of County Sanitation District No.1]. of Orange County,California,resolves as follows: WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests in connection with the construction of Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications submitted by the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo amd approved by the Chief Engineer and General Manager and by the Districts by Resolution No.255 ~dated March ~,1953,and WHEREAS:The Engineers have submitted a proposal to do the work which is reasonable and in the best interests of the Districts and will expedite the afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the Districts do employ Harrison and Woolley,Headman, Ferguson and Carollo to perform the construction surveys,detailed inspection and supervision Including material tests on Bushard Street and Treatment Plant Trunks in accordance with the plans and specifications heretofore adopted by the District and to the eat isfaction ofthe Chief Engineer and General Manager of the Districts for a total sum equal to three and one half per cent (3~%)of the terminal contract costs to be paid in seven (7)installments as follows: 1/2 of 1%of contract award price 30 days after contractor has commenced work,and 1/2 of 1%each month thereafter until 3%has been paid.The balance of total of 3~%to be paid 35 days after acceptance of work by the Districts. — I 4 The foregoing resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No.on the 25th clay of March ,1953. (~ Secretary,Board of Directors II County Sanitation District No. Orange County,Ca1i.L~ornia STATE OF CALIFCRWTh) ss COUNTY C~O~H GE I,OR~I~~E i’•:~RRITT,Secretary of the Board of Directors of County Sanitation District Ho.11 ~Orange County,California, do hereby certify that the foregoinr~Resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No.of Oran~e County,Ca1iforni~.,held on the 25th day of March ~1953,by the following roil call vote: AYES:Directors Vex~non ~L~ngenbeck,Roy~8eabridge and Willis H.warner NOES:None ABSENT: IN V~TH.f~tS WHEREOF,I have hereunto set my hand and affixed t~i~seal of County Sanitation District No.II of Or~n~e County, California,this 2Stl~ia3r of March ,1953. Secretary,Board.of Directors Count~T Sanitation District No. Orarre County,California