HomeMy WebLinkAboutResolution 1953 - 0261-1, 2, 3, 6, 7, and 11RESOLUTION NO.261-I
A RESOLUTION OF THE BOARD OF DIRECTORS OP COUNTY
SANITATION DISTRICTS NOS.1-2-3-6-7 &11 OF ORANGE
COUNTY,CALIFORNIP;PROVIDING FOR CONSTRUCTION
SURVEYS,DET~ILED INSPECTION,SUPERVISION AND
M.PTERIPL TESTS ON THE CONSTRUCTION OF BUSHARD STREET
P ND TRE!.TMENT PLANT TRUNKS.
The Board of Directors of County Sanitation District No.1
of Orange County,California,resolves as follows;
WHEREAS:The Districts do require construction surveys,
detailed inspection,supervision and material tests in connection
with the construction of Bushard Street and Treatment Plant Trunks
in accordance with the plans and specifications submitted by
the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo
a~d approved by the Chief Engineer and General Manager and by the
Die tricts by Resolution No.255 ,dated March 25,1953,and
WHEREAS:The Engineers have submitted a proposal to do the
work which Is reasonable and in the best Interests of the Districts
and will expedite the afore mentioned construction,
NOWTHEREPORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headman,
Ferguson and Carollo to perform the construction surveys,detailed
inspection and supervision including material tests on Bushard
Street and Treatment Plant Trunks in accordance with the plans and
specifications heretofore adopted by the District and to the sat
isfaction of’the Chief Engineer and General Manager of the Districts
for,a total sum equal to three and one half per cent (3~%)of the
terminal contract costs to be paid in seven (7)installments as
follows:
1/2 of 1%of contract award price 30 days after contractor
has commenced work,and 1/2 of 1%each month thereafter until
3%has been paid.The balance of total of 3~%to be paid
35 days after acceptance of work by the Districts.
The foregoing resolution was passed arid adopted at a regular
meeting of the Board of Directors of County Sanitation District
No.I ,on the 25th day of March ,1953.
~~)/~ø//~~~
Secreta~3~Td of~Trrec to~
County ~8 t~icn Di~tf’~Ct No.1
Orange County,California
STATE OF CALIFORNIA)
ss
CCUNTY OF ORANGE )
I,ORA MAE MERRITT,Secretary of the Board of Directors
of County Sanitation District No.1 of Orange County,California,
do hereby certify that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of~Directors of County
Sanitation District No.1 of Orange County,California,held on
the 25th day of March ,1953,by the following roll call
vote:
AYES:Directors 3.L.McBride,Courtney R.Chandler
and Willis B.W&rner
NOES:None
ABSENT:None
IN WITNESS WHEREOF,I have hereunto set my hand and affixed
the seal of’County Sanitation District No.1 of Orange County,
California,this 25th day of March ,1953.
~
Secretary,Board of Directors
County Sanitation District No.1
Orange County,California
RESOLUTION NO~2~1-2
A RESOLUTION OF ThE BOARD OF DIRECTORS OF COUNTY
S~NITATION DISTRICTS NOS.1-2-3-6-7 &11 OF ORANGE
COUNTY,CALIFORNIA;PROVIDING FOR CONSTRUCTION
SURVEYS,DETAILED INSPECTION,SUPERVISION AND
MATERI?L TESTS ON THE CONSTRUCTION OF ~USHARD STREET
IND ThE!TMENT PLANT TRUNKS.
The Board of Directors of County Sanitation District No.2
of Orange County,California,resolves as follows:
WHEREAS:The Districts do require construction surveys,
detailed inspection,supervision and material tests In connection
with the construction of Bushard Street and Treatment Plant Trunks
in accordance with the plans and specifications submitted by
the Engineers,Harriaon and Woolley,Headman,Ferguson and Carollo
a~d approved by the Chief engineer and General Manager and by the
Districts by Resolution No.2~,dated March25,1953,and
WHEREAS;The Engineers have submitted a proposal to do the
work which Is reasonable and in the best Interests of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headman,
Ferguson and Carollo to perform the construction surveys,detailed
inspection and supervision including material tests on Bushard
Street and Treatment Plant Trunks in accordance with the plans and
specifications heretofore adopted by the Di8triot and to the sat
isfaction of the Chief Engineer and General Manager of the Districts
for a total sum equal to three and one half per cent (3~%)of the
terminal contract costs to be paid in seven (7)installments as
follows:
1/2 of 1%of contract award price 30 days after contractor
has commenced work,and 1/2 of 1%each month thereafter until
3%has been paid.The balance of total of 3~%to be paid
35 days after acceptance of work by the Districts.
The foregoing resolution was passed and adopted at a regular
meeting of the Board of Directors of County Sanitation District
No,2
,
on the day of ,1953.
~
__
Secretary,Board of Directors 2
County Sanitation District No.
Orange County,California
STATE CF CI’iIFCRNIi~)
55
COUNTY 02 C~AKGE
I,ORA ~AE L~RRITT,Secretary of the Board of Directors of
County Sanitation District 1•~o.
2
of Orange County,CaliJ.’ornia,
do hereby certify that the foregoinc~Resolution was pass~and
adopted at a re2:u.iar meeting of the Bodrd of Directors of County
Sanitation District No.of Oran~e Countir,California,held on
the ~day of
,1953,by the followinrr,roll call
•
vote:
AYES:Directors
De~W,H~son,?~n~~.Swt~z~Jr.~
Ch~tri~,~,at~ven~Willis H.Warner,Wi1lia~i ~
~irst otti ar~d Robert W.&~r~ey
NOES:
ABS ENT:~~\~.Z’~~
Ii\T WIT~S WHEREOF,I have hereunto set my hand and affixed
tne seal of CourLty Sanitation District No.2 of Orr~fl~e County,
California,this ~5~ay of
,1953.
Secretary,Bdard of ~irectors
County Sanitation District No.2
Oran~e County,California
RESOLUTION NO.251.3
A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY
SPNITATION DISTRICTS NOS.1-2-3-6-7 &11 OF ORANGE
COUNTY,CALIFORNIA;PROVIDING FOR CONSTRUCTION
SURVEYS,DETAILED INSPECTION,SUPERVISION AND
MPTERIPL TESTS ON THE CONSTRUCTION OF BUSHARD STREET
A.ND TRE!TMENT PLANT TRUNKS.
The Board of Directors of County Sanitation District No.3
of Orange County,California,resolves as follows:
WHEREAS:The Districts do require construction surveys,
detailed inspection,supervision and material tests In connection
with the construction of Bushard Street and Treatment Plant Trunks
in accordance with the plans and specifications submitted by
the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo
a~d approved by the Chief Engineer and General Manager and by the
Districts by Resolution No.255 ,dated March25 ,l953,and
WHEREAS:The Engineers have submitted a proposal to do the
work which Is reasonable and in the best interests of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headman,
Ferguson and Carollo to perform the construction surveys,detailed
Inspection and supervision including material tests on Bushard
Street and Treatment Plant Trunks In accordance with the plans and
specifications heretofore adopted by the District and to the sat-.
isf’action of the Chief Engineer and General Manager of the Districts
for a total sum equal to three and one half per cent (3~%)of the
terminal contract costs to be paid in seven (7)installments as
follows:
1/2 of’1%of contract award price 30 days after contractor
has commenced work,and 1/2 of 1%each month thereafter until
3%has been paid.The balance of total of 3~%to be paid
35 days after acceptance of work by the Districts.
The foregoing resolution was passed and adortecl at a regular
meeting of the Board of Directors of County Sanitation District
lo.on the 25th clay of March 1953.
-
~
_
Secretary,Board of Directors
County Sanitation District No.
Orsnge County,California 3
STATE OF ~
ss
CC.;UNTY c~O~NGE
I,ORA ~AE hi~HITT,Secretary of the Board of Directors of
County Sanitation District No.of Orane County,California,
do hereby certify that the foregoir~Resolution was passed and
adopted at a re7.u.lar meeting of the Board of Directors of County
Sanitation.District No.of Oran~e County,Ca1iforni~.,held on
the
25th day of
Mb ,1953,by the following roil call
vot e:
AYES:Directors
Nelson M.Launer,Willis H.Warner,C.R~
Miller,Joseph Webber,Robert H.Boney and Ch~r1es
E,Stevens
NOES:
I’Tone
ABSENT:Director Hugh W.Warden
IN ~TI:H~S WH±~REOF,I have hereunto set my hand and affixed
tae s~ai of County Sanitation District No.of Or~fl~e County,
California,Ufli~5th day of
March
1953.
c~
__
Secretary,Board of Directors
County Sanitation District No.
Oran~e County,California 3
RESOLUTION NO.261-6
~RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY
Sf NITATION DISTRICTS NOS.1-2-3-6-7 &11 OF ORANGE
COUNTY,CALIFORNIP;PROVIDING FOR CONSTRUCTION
SURVEYS,DETAILED INSPECTION,SUPERVISION AND
MPTERIL TESTS ON THE CONSTRUCTION OF BUSHARD STREET
AND TREP TI4ENT PLANT TRUNKS.
The Board of Directors of County Sanitation District No.6
of Orange County,California,reso].vesas follows:
WHEREAS:The Districts do require construction surveys,
detailed inspection,supervision and material tests in connection
with the construction of Bushard Street and Treatment plant Trunks
in accordance with the plans and specifications submitted by
the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo
aud approved by the Chief ~ngineer and General Manager and by the
Districts by Resolution No.255 ,dated March 25~1953,and
WHEREAS:The Engineers have submitted a proposal to do the
work which is reasonable and In the best interests of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headman,
Ferguson and Caro].lo to perform the construction surveys,detailed
inspection and supervision including material tests on Bushard
Street and Treatment Plant Trunks in accordance with the plans and
specifications heretofore adopted by the District and to the sat
isfaction of the Chief Engineer and General Manager of the Districts
for a total sum equal to three and one half per cent (3~%)of the
terminal contract costs to be paid in seven (7)installments as
follows:
1/2 of 1%of contract award price 30 days after contractor
has commenced work,and 1/2 of 1%each month thereafter until
3%has been oaid.The balance of total of 3~%to be paid
35 dayg after acceptance of work by the Districts.
The foregoing resolution was passed.and adopted at a regular
meeting of the Board of Directors of County Sanitation District
6 25th March
No.
,
on the day of
,1953.
~~
Secretary,Board of Directors 6
County Sanitation District No.
Oran~,e County,California
STATE OF Ci~IFCR~NIi~)
ss
COUNTY OF ORANGE )
I,ORA ~:AE ~.~R1u1rT,Secretary of the Board of Directors of
6
County Sanitation District No~.of Orange County,California,
do hereby certify that the foregoin~’.Resolution was passed and
adopted at a rer~ular meeting of the Bodrd of Directors of County
6
Sanitation District No.of Oranc~e Count’r,California,held on
25th March
the day of
,1953,by the following roll call
vat e:
Willis H.Warner,Braden Finch and
AYES:Directors
A.if.Meyers
None
NOES:
None
ABSENT:
IN T~TFL~S WHEREOF,I have hereunto set my hand and affixed
6
ttie seal of County Sanii:;ation District No.of Oran~e County,
25th March
California,this day of
,1953.
Secretary,Board of Dii’ectors 6
County Sanitation District No.
Oran~e County,California
RESOLUTION NO.#61-7
A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY
St~NITATION DISTRICTS NOS.1-2-3-6-7 &13.OF ORANGE
COUNTY,CALIFORNIP;PROVIDING FOR CONSTRUCTION
SURVEYS,DETAILED INSPECTION,SUPERVISION I\ND
MATERIPL TESTS ON THE CONSTRUCTION OF BUSRPRD STREET
AND TREATMENT PLANT TRUNKS.
The Board of Directors of County Sanitation District No.7
of Orange County,California,resolves as follows:
WHEREAS:The Districts do require construction surveys,
detailed inspection,supervision and material tests in connection
with the construction of Bushard Street and Treatment Plant Trunks
in accordance with the plans and specifications submitted by
the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo
amd approved by the Chief ~ngineer and General Manager and by the
Districts by Resolution No.255 ,dated March 25,1953,and
WHEREAS;The Engineers have submitted a proposal to do the
work which is reasonable and in the beat interests of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Wool]ey,Headman,
Ferguson and Carollo to perform the construction surveys,detailed
inspection and supervision Including material teats on Buahard
Street and Treatment Plant Trunks in accordance w~.th the plans and
specifications heretofore adopted by the District and to the sat
isfaction of the Chief Engineer and General Manager of the Districts
for a total sum equal to three and one half per cent (33~)of the
terminal contract costs to be paid in seven (7)installments as
follows:
1/2 of 1%of contract award price 30 days after contractor
has commenced work,and 1/2 of 1%each month thereafter until
3%has been paid.The balance of total of 3~%to be paid
35 days after acceptance of work by the Districts.
—
The foregoing resolution was passed and adopted at a regular
meeting of the Board of Directors of County Sanitation District
No.
,
on the25th day of March ,1953.
~~~22/~
Secretary,Board of Directors
County Sanitation District No.7
Orange County,California
STATE OF CAL IFORNIA)
ss
COUNTY (2 ORANGE
I,ORA i:AE LjER1tITT,Secretary of the Board of Directors of
County Sanitabicn District No.7 of Orange County,California,
do hereby certify that the foregoing.Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.7 of Orange Count~,California,held on
the 25th day of March ,1953,by the following roll call
vot e:
AYES:Directors 3,1..:McBrj~3c~,Willis ft Warner and
Vincent L,fltaeeton
NOES:None
ABSENT:None
IN WITNESS WHEREOF,I have hereunto set my hand and affixed
the seal of County Sanitation District No.7 of Orante County,
California,this 25thiay of March ,1953.
~pe
____
Sedretary,Board of Directors
County Sanitation District No.7
Orange County,California
RESOLUTION NO.261-11
A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY
SANITATION DISTRICTS NOS.1-2-3-6-7 &1].OF ORANGE
COUNTY,CALIFORNIA;PROVIDING FOR CONSTRUCTION
SURVEYS,DETAILED INSPECTION,SUPERVISION AND
MATERIAL TESTS ON THE CONSTRUCTION OF BUSHARD STREET
AND TREATMENT PLANT TRUNKS.
The Board of Directors of County Sanitation District No.1].
of Orange County,California,resolves as follows:
WHEREAS:The Districts do require construction surveys,
detailed inspection,supervision and material tests in connection
with the construction of Bushard Street and Treatment Plant Trunks
in accordance with the plans and specifications submitted by
the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo
amd approved by the Chief Engineer and General Manager and by the
Districts by Resolution No.255 ~dated March ~,1953,and
WHEREAS:The Engineers have submitted a proposal to do the
work which is reasonable and in the best interests of the Districts
and will expedite the afore mentioned construction,
NOW THEREFORE,BE IT RESOLVED:
That the Districts do employ Harrison and Woolley,Headman,
Ferguson and Carollo to perform the construction surveys,detailed
inspection and supervision Including material tests on Bushard
Street and Treatment Plant Trunks in accordance with the plans and
specifications heretofore adopted by the District and to the eat
isfaction ofthe Chief Engineer and General Manager of the Districts
for a total sum equal to three and one half per cent (3~%)of the
terminal contract costs to be paid in seven (7)installments as
follows:
1/2 of 1%of contract award price 30 days after contractor
has commenced work,and 1/2 of 1%each month thereafter until
3%has been paid.The balance of total of 3~%to be paid
35 days after acceptance of work by the Districts.
—
I 4
The foregoing resolution was passed and adopted at a regular
meeting of the Board of Directors of County Sanitation District
No.on the 25th clay of March
,1953.
(~
Secretary,Board of Directors II
County Sanitation District No.
Orange County,Ca1i.L~ornia
STATE OF CALIFCRWTh)
ss
COUNTY C~O~H GE
I,OR~I~~E i’•:~RRITT,Secretary of the Board of Directors of
County Sanitation District Ho.11 ~Orange County,California,
do hereby certify that the foregoinr~Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.of Oran~e County,Ca1iforni~.,held on
the 25th day of March
~1953,by the following roil call
vote:
AYES:Directors Vex~non ~L~ngenbeck,Roy~8eabridge
and Willis H.warner
NOES:None
ABSENT:
IN V~TH.f~tS WHEREOF,I have hereunto set my hand and affixed
t~i~seal of County Sanitation District No.II of Or~n~e County,
California,this 2Stl~ia3r of March
,1953.
Secretary,Board.of Directors
Count~T Sanitation District No.
Orarre County,California