Loading...
HomeMy WebLinkAboutResolution 1953 - 0254-5 & 6RESOLUTION NO. A RESOLUTION OF THE BOARD OF DIRECTORS OP COUNTY SANITATION DISTRICTS NOS.5 AND 6 o~ORANGE COUNTY, CALIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS, DETAILED INSPECTION,SUPERVISION AND MATERIAL TESTS ON THE CONSTRUCTION OF UNITS 2 AND 3 OP THE NEWPORT BEACH TRUNK (B). The Board of Directors of County Sanitation District No. of Orange County,California,resolves as follows: WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests in connection with the construction of Units 2 and 3 of the Newport Beach Trunk (B)in accordance with the plans and specifications submitted by the Engineers,Harrison and Woolley,Headman,Ferguson and Caro].lo and approved by the Chief Engineer and General Manager and by the Districts by Resolution No.,dated March 4,1953,and WHEREAS:The Engine~ra have submitted a proposal to do the work which is rea8onable and in the beat interests of the Districts and will expedite the,afore mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the )~.atr,icts do employ Harrison and Woolley,Headman, Ferguson and Carollo.to perform the construction surveys,detailed, inspection.and supervision including material test~on Newport Beach Trunk (B)1 Units 2 and 3~in accordance with the plans and specifications heretofor~:ad~ted by the Districts and to the sat isfaction of the Chief ~Engineer’and General’Manager of the Districtc for a total sum equal •to’foiir per cent~(l4~)of the terminal con tract costato be put in four (4)installments as follows: ~ne per cent~’(l%)of the bid contract price thirty ~3O)days after contractor com~enoed work. One ‘per cent (1%)of the bid contract price sixty (60)days after !contractor commenced work. One per cent,(l%):of the bid contract price ninety (90)clays after contractor commenced work.. The final payment equal to~the total amour.t.remaining due on the,s~m equalto four per cent (14%)’~f the terminal contract costs thirty~’(3O)daya’a~tercompl,~t~c-~and acceptance of the work. The foregoing resolution was passed.and adopted at a regular meeting of the Board of Directors of County Sanitation District No.~on the~th day of ,1953. (~ Secretary,Board of Directors County Sanitation District No. Orange County,Oslifornia STATE OF C~IFOSRJ~L~) ss CCUNTY ~O:~I’GE I,OR~~~.J~R.LTT,Secretary of the Board of Direc1~ors 01 County Sanitation District Uo.of Orange County,California, do hereby certify that the foregoing Resolution was passed arid adopted.at a regular meeting of the Bodrd of Directors of County Sanitation District No.of Oran~e Countir,California,held on the day of ,1953,by the foilowinç.,roll call vote: AYES:Directors ~~~. NOE~S: ABS ENT: IN WITN:~S WHEREOF,I have hereunto set my hand and affixed th~s~a1.of Count Sanitation District No.~of Or~’.n~e County, California,this day of ,1953. S~retary,Board of Directors County Sanitation District No. 0 ran~~e County,c al i for ni a 2~4 RESOLUTION NO. A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY SANITATION DISTRICTS NOS.5 AND 6 OF ORANGE COUNTY, C1LIFORNIA;PROVIDING FOR CONSTRUCTION SURVEYS, DETAILED INSPECTION,SUPERVISION AND MATERIAL TESTS ON THE CONSTRUCTION OF UNITS 2 AND 3 OF THE NEWPORT BEACH TRUNK (B). The Board of Directors of County Sanitation District No. of Orange County.,California,resolves as follows: WHEREAS:The Districts do require construction surveys, detailed inspection,supervision and material tests in connection with the construction of’Units 2 and 3 of the Newport Beach Trunk (B)in accordance with the plans and specifications submitted by the Engineers,Harrison and Woolley,Headman,Ferguson and Carollo and approved by the Chief En~~eer and General Manager and by the Districts by Resolution No.,dated March k,1953,an~ WHEREAS:The Engineers have submitted a proposal to do the work which is reasonable and In the best Interests of the Districts and will expedite the afore ‘mentioned construction, NOW THEREFORE,BE IT RESOLVED: That the llstricta doemploy Harrison and Woolley,Headman, Ferguson and Carolloto perform the construction surveys,detailed lnsp~ction and supervision Including material tests on Newport Beach Trunk (B),Units 2 and 3m accordance with the~plans and specifications heretofore ad~ted by the Districts and to the sat isfaction of the Chief Engineer and General Manager of the Districts for a total sum egual’.to fotir per cent (4%)of the :teriilmnal con tract’costs to be put in four (4)installments as follows: me per cent (i%)of the bid contract price thirty (30)days after contractor commenced work. ~epèrcent (1%)of the bid contxact price sixty (60)days after opntracto’r commenced work.’ One per cent (1%)of the bid contract price ninety. (90)days after contractor commenced work,:’ The final payment equal’to the total amour.t remaining due on the sum.equal to roth’per cent (4%)of the terminal contract costs thirty (30)days after eomp12t~c~and acceptance or the work. The foregoing resolution was passed and adopted at a regular meeting of the Board of Directors of County Sanitation District No.•on the ?~th day of ,1953. Secretary,Board of Directors County Sanitation District No. Or~n~,e County,C~Qifornia STATE OF CALIFCRi~I~) ss COUNTY CF O~d~GE ) I,ORA iIAE I:RRITT,Secretary of the Board of Directors of County Sanitation District ito.of Orange County,California, do hereby certify that the foregoinc i-?~esOlution was passed and adopted at a re~u.iar i~eeting of the Bodrd of Directors of County Sanitation District lo.of Oranp~e Couritir,California,held on the ~day of ,1953,by the fol1owin~,roll call vote: AYES:Directors ~t~ö ~~ ~3~4 NOES: £l~)L)i_i IN T~TNC~jS WHi~REOF,I have hereunto set ifly hand and affixed thc seal.of County Sanitation District No.6of Oran~:e County, California,this 4~day of ,1953. • __ Secretary,Board of Directors 6 County Sanitation District No. Oran~e County,California