HomeMy WebLinkAboutResolution 1952 - 0235-1, 2, 3, 5, 6, 7, and 11RESOLUTION NO.23~—1 ~~Ltt~-J ~‘Y
RESOLUTION OF THE BOARD OF DIRECTORS OF
COUNTY SANITATION DISTRICTS NOR.1,2,
3,5,6,7 and 11 OF ORAciE~COUNTY,
CALIFORNIA,PROVIDING FOR CERTAIN CON—
STRUCTION SURVEYS,D~PAILTJ)INSPECTION
AND MATERIAL TESTS ON THE CONS ThUCTION
OF ThE OCEAN OUTFALL,GOTH LAND AND MARINE
SECTIONS,AND PROVIDING AN INTERIM
MODIFICATION OR CuE CONThACT BE~PWEEN TRE
DISTRICTS AND SAID ENGINEERS,~TED
FEBRUARY 1,1952.
SECTION I:GIIEREAS,the Districts do ruquire certain con
struction surveys,detailed inspection and material tests in
connoction with thu construction of thD Ocean Outfall,both land and
narine sections,in accordance with t.Hc plans and specifications
:ubnitted by the Enginoars Harrison &‘Jôollay,and Headman,Ferguson
&Carollo,end approved by the Districts,or to ho submitted by said
Engineers and approved by the Districts,in the ease of the Land
Section,and
WHEREAS,said Engineers have indicated thir agreement to
rerfom the above work for a lump sun foe of Eighty—two Thousand and
No/lOO ($82,000.00)Dollars,which sun includes payment for work
already done on the Marine Section by said Engineers,as directed by
unanimous notion of the joint Boards on October 22,1952,and
WHEREAS,it is for the best ~ntorests of the Districts end
for the expediting of the construction of said Ocean Outfall,both
land and marine sections,
NOU,THEREFORE,~IT RESOLVED:That (Paragraph VIII)of thu
contract between the Districts and said Engineers,detod February 1,
l~fr2 be,end the seice is hereby nodifieci to provide for the payen;nt
i said Engineers of thu lump sun fee of Eighty—two Thousand and
La/lCD (~82,000,0O)Dollars covering work perfor2acd or to b~no:a’crmo(
by said Engineers in connection with construction s~e~:dotailid
~.nspeetion to the satisfaction of the C1iie~’Engineer and General
hanagar,and material tests on the ca~rs bruction of the Ocean Outfall,
both lend ond narin~sections,in accordance with the plans and
epecifications submitted by said Engineers and approved by the
-1—
District,o~te t soc~rnitt~L b~j sbid Encdneers and approved by the
Districts,in the case or the land section,said payment to be made
as follows:Eight Thousand and yo/l00 (~8,OO0.O0)Dollars on or
before the 10th day of January,l9~3,and Eight Thousand and No/iOO
(~8,000.0O)Dollars on each month thereafter for nine (9)months
until the sui~of Severity—two Thousand and No/lOO ($72,000.00)Do11a:.~s
has been paid.The balance of Ten Thousand and.No/l00 ($10,000.00)
Dollars shall be paid upon completion of the contracts for construc
tion and the acceptance thereof by the Districts.If the construction
work is co~eo1eted and accepted by the Districts prior to the expira
tion of the tc~v~.above set forth,then any balance then renaming duo
~‘boil be paid.
SECTION II:WHEREAS,a contract is being nec~otiated between
s~id~aiigin~~rs ~uV bha Dis tricts ~inrit sun-contract is con—
teriplated to replace the contract of February 1,1952,which said
now contract was tentaviely approved by the Districts on October 1,
1952,and it is desirable to provide for the correlation of this
nodification and said proposed new contrsct,
NOi,T~b-~Ei?0RE,DE IT RESOLV~D:Bhat in the event a luxLp sUn
~ntract is approved and entered into between the Districts and said
ngineers covering the joint works oi’said Districts as proposed and
t~entatively approved on Oc~o~er 1,l9~2,tue payrients made under this
modification shall be credited to bhe Districts against the lump sum
provided in caid contract,provided,however3 that said proposed
contract is or’teoed into prior to Decembor l~,1952.
TiAC fore go1n~resolution was passed and adopted at a ro~u1ar
~.c ~-~uno~nnot~.n~of the Board of Directors of County Sanitation
~~:~r.’ct ;i~,I
,oil tho 19th day of ~bove1i1bcr 1952.
~~A
Secrotsry,Bcar~DLrectois
County Sanitation Dis~riat No.~I
Orange County,California
-2—
STATi~OF CALIFORNIA)
ss
COUNTY OF ORANGE )
I,ORA MAE MERRITT,Secretary of the Board of Directors of
County Sanitation District No.2 of Orange County,California,
do hereby certify that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.I of Orange County,California,held on
the ~iC~day of *3V*S.
,1952 by the foil~~owing roll.cnil vnt,es
AYES:Directors t41L~ss It,~flt*%J~1w,
~Aflflfl Lt.4~ae
NOES:
ABSENT:
IN WITNESS WHEREOF,I have hereunto set my hand and affixed the
seal of County Sanitation District No.I of Orange County,California.
this Situ day of RQV*tbe ,1952.
~a
Secretary,Board of Directors
County Sanitation District No..2
Orange County,California
RESOLUTION NO.235—2
RESOLUTION OF THE BOARD OF DIRECTORS OF
COUNTY SANITATION DISTRICTS 1105,1,2,
3,5,6,7 and 11 OF ORAiKRJ COUNTY,
CALIFORNIA,PROVIDING FOR CERTAIN CON
STRUCTION SURVEYS,DETAILED INSPECTION
AND MATERIAL TESTS ON THE CONSTRUCTION
OF ThE OCEAN OUTFALL,NOTE LAND AND MARINE
SECTIONSb AND PROVIDING All INTERIM
MODIFICATION OF THE CONTuACT HEINEEN TNE
DISTRICTS AND SAID ENGINEERS,DATED
F~3RTJARY 1,1952,
SECTION I:NNEREAS,the Districts do require certain con
struction surveys,detailed inspection and material tests in
connection with the construction of the Ocean Outfall,both lend and
narine sections,in accorcanac with t~a plans and specifidations
~ubnittcd by the Engineers Harrison &Noolley,and Headman3 Ferguson
&Carollo,and approved,by thu Districts,or to be submitted by said
Engineers Gnd approved by the Districts,in the case of the Land
Section,and
WHEREAS,said Engineers have indicated thuir agrecnant to
perTain the above work for a lump sun fee of Eighty-two Thousand and
No/100 ($82,000.00)Dollars,which sum includes paynent for work
already done on the Marine Section by said Engineers,as directed by
unanimous notion of the joint Boards on October 22,1952,and
WHEREAS,it is for the best ~ntcrcsts of the Districts and
for the expediting of the construction or said Ocean Outfall,both
land arid piai~,nc sections,
NOW,THEREFORE,NE IT RESOLVED:That (Paragraph VIII)of thu
contract’between the Districts and said Engineers,dated Fc.hruary 1,
1~L~2 be,and the sorie is hereby nodified to provide for the payeent
•
i said Engineers of the lump sun foe of Eighty—tue Tuousand and
io/loO (~2,OOO,O0)Dollars covering work perforiLd or to he nc:L’crmo{
by scid Engineers in connection with construction se~~detailed
inspection to the satisfaction of the Chief Engineer and General
linnager,and matorial tests on the e)iIs true tion of the Ocean Outfall,
both land and marine sections,in accordance with the plans and
Epecificateons submitted by said Enginccrs and approved by the
-1—
.
District,o~~h subinitt~d b~,’s~id Engineers and approved by the
Districts,in the case of the land section,said payment to be made
as follows:Eight Thousand and 1ro/l00 (1~8,000.00)Dollars on or
before the 10th day of January,1953,and Eight Thousand and No/lOG
(~8,000.00)Dollars on each r~onth thereafter for nine (9)Nonths
until the sui~of Seventy—two Thousand and No/lO0 (~72,000.00)Dolla:~s
has been paid,The balance of Ten Thousand arid i~o/l00 (~l0,OO0.00)
Dollars shall be pai.d upon cor-ipletion of the contracts for construc
tion and the acceptance thereof by tr!e D:Lstricts.If the construction
work is camoleted and accepted by the Districts prior to the expira
tion of the tcn~above set forth,then any balance then renaming th-a
~‘hell be paid.
SECTION II:WHEREAS,a contract is bein,~negotiated between
add Lh~Districts :~r~b~l~r~sun contr~iot is con—
teriplated to replace the contract of February 1,1952,which said
new contract was tentaviely approved by the Districts on October 1,
19~2,end it is desirable to provide for the correlation of this
nod.ification and said proposed new contract,
N0d,Th:u1~”oRE,BE IT RES0LV~D:Ihat in the event a lunp sum
~iitract is approved and entered into between the Districts and said
nCineers covering the joiut wri:s ci said Districts as proposed and
tentative1~y app~ved on October 1,l9~2,the payments riade under this
riodification shall be credited to the Districts aCainst the lurip s’~xa
provided i~i said contract,provided,however~that said proposed
contract is ertered into prior to 1)eoembr 15,1952.
Tii:~f:’rc~oing resolution was passed and adopted at a re~ular
~~i~oet:u~of the Board of Directors of County Sanitation
;rjct Wo,*
,on tha 19th day of November,1952.
Secrot~ry,~oar~~rectors
County Sanitation District No.2
Orange County,California
—2—
STATE OF CALIFORNIA)
•ss
COUNTY OF ORANGE )
I,ORA MAE MERRITT,Secretary of the Board of Directors of
county Sanitation District No.2 of Orange County,California,
do hereby certify that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.2 of Orange County,California,held on
the ~tta day of f~YJ:~?
,1952 by the following roil call ynte;
AYES:Directors LId~t ~i~t~-.<~:~~
~:~a~t~t •>t:~t ~.~.x ~‘hj
~_~.••J ~•
NOES:TI
-
kBSENT:T~_:.~)
IN WITNESS WHEREOF,I have hereunto set my hand and affixed the
seal of County Sanitation District No.a of Orange County,California.
this ~day of ,1952.
~~~
Secretary,Board of DirecItors
County Sanitation District No.2
Orange County,California
RESOLUTION NO.235—3
RESOLUTION OF THE F~OAIi)05?PIECICTORS OF
COUNTY SANITATION DISTRICTS NOR.1,2,
3,5,6,7 and 11 OF ORACGE COUNTY,
CALIFORNIA,PROVIDING FOR CERTAIN CON
STRUCTION SURVEYS,D~pAIE-;T)INSPECTION
AND MATERIAL TESTS ON THE cONSTRUCTION
OF ThE OCEAN OUTFALL,GOTH LAND AND MARINE
SECTIONS,AND PROVIDING All INTERIM
hODIFICATION OF THE CONTRACT E’TiJAEN THE
DISTRICTS AND SAID ENGINEERS,DATED
FEBRUARY 1,1952.
SECTION I:T-JI-~REAS,the Districts do require certain con
struction surveys,detailed inspection and material tests in
connection witd the construction of thc.Ocean Outfall,both land and
marine sections,in aoccrd~ince witi.i t~ic plans and specifications
eubmitted by the Engineers Harrison &Ucolloy,and Nc--eaen,Ferguson
&Carollo,and approved by the Districts,or to h.submitted by said
Engineers and approved by-the Districts,in the ease of the Land
Section,and
WEE AS,said Engineers have indicated their agreement to
perform the above work for a lump sun fee of Eighty-two Thousand and
?io/100 ($82,000.00)Dollars,which sun includes payment for work
already done en the Marine Section by said Engineers,as directed by
unanincus motion of the joint Boards on October 22,1952,and
WITERELS,it is for the h5st :~nterests of the Districts and
~‘cr the expediting of the construction of said Ocean Outfall,beth
land and narine sections,
NCU,THEREFORE,BE IT RESOLVED:That (Para~reph VIII)of tue
~ontract hetweon ti:.e Districts and said Engineers,dated Februegy 1,
l’~2 be,and the some is hereby modified to provide for tue paycient
-said Engineers of the lump cur foe of Rig1~ty_tTo Thousand and
c-c/lOU (~2,000.00)Dollars covering work pc~rfcn or to ~nesEormee
l;~said Engineers in connection with construction ~i -.~e~1:detailed
:Lnspection to the satisfaction of the Chief Engineer ard General
lianager,and material tests on the consteuction of the Ocean Outfall,
both land and marine sections,in accordance with the plans end
epecifications submitted by said Engineers and approved by the
-1—
District,o~to ~~ittoLi ~s~jd Eiicdneers and approved by ~he
Districts,in the case of the land section.,said payment to be made
as follows:Eight Thousand arid i~o/ioo (~8,OOO.OO)Dollars on or
before the 10th day of January,1953,and Eight Thousand and P0/100
(~8,OOO,0O)Dollars on each month thereafter for nine (9)months
until the sun of Seventy—two Thousand and No/l00 ($72,000.00)~lle~s
has been paid,The balance of Ten Thousand and ~o/l0O (~lO,000.00)
Dollars shall he paid upon completion of the contracts for construc
tion and the acceptance thereof by the D:Lstricts.If the construction
work is completed and accepted b~j the Districts prior to the expira
tion of the terre above set forth,then any balance then renaming duo
n~-9ll be paid.
SECTION II:WHEREAS,a contract is bein~nec~otiated between
bho Disericts v:ltr~p sum contract is con—
templated to replace the contract of’February 1,1952,which said
new contract was tentaviely approved by the Districts on October 1,
1952,ond it is desirable to provide for the correlation of this
~iodification ard said proposed new contract,
NO~i,~:~Fii’0RE,DE IT F~S0L~T~1):That in the event a lua±p sum
.ntract is approved ~nd entered into betweun the Districts and said
igineers covering;the joint works ~said Districts as proposed end
tentatively approved on Oo~cber 1,l7~2,tLic pa~rr~ents made under this
modification shall be credited to the Districts a~ainst the lump sum
provided in oaid contract,provided,ilowever~that said proposed
contract is cr:tercd into prior to Decembor 15,1952.
TLIC fursi~oing reso1ut~on was passed and adopted at a rar~u1ar
~ooz’no5 iOnet?.O~of the Board of Directors of County Sanitation
4::~e~’.ict ~,on the 19th day of I~ovemhar,1952.
~~
Secrotrry,B~ard ot D~rectors
County Sanitation Dls~rict No,3
Orange County,California
-2—
.~
STATE OF CALIFORNIA)
ss
COUNTY OF ORANGE )
I,ORA MAE MERRITT,Secretary of the Board of Directors of
Count~Sanitation District No.i of Orange County1 California,
db hereby certify that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.3 of Orange County,California,held on
the i’it1k day of ~i~Y~b~!
,1952 by the following roil c~Li v~~t~e:
AYES:Directors $L4~t~s~d*~,~~~i~2~h
~eb~er~,~.~L.~~wi ~~I.‘*i~noir
NOES:
ABS ENT:
IN WITN~BS WHEREOF,I have hereunto set my hand and affixed the
seal of County Sanitation District No.of Orange County,California.
this 1)th day of v~nbe~,1952.
~Vr
Secretary,Board of Dir’ectors
County Sanitation District Noc,3
Orange County,California
.i~3i~i.
RESOLUTION NO.23 5—5
RESOLUTION OF THE BOArD)OF DId’hCTORS OF
COUNLY SANITATION DISTRICTS NOS.1,2,
3,5,6,7 and 11 OF ORANGT±.COUNTY,
CALIFORNIA,PROVIDING FOR CERTAIN CON~
STEUCTION SURVEYS,DETAILhO INSPECTION
APi)MATERIAL TESTS ON TH~:CONSTRUCTIOI~
OF tIHE OCEAN OUTFALL,ROTH LAND AND MARINE
SECTIONS,AND PROVIDING AR INTERIM
MODIFICATION OF ~HE CONThACT E~TWEEN TUN
DISTRICTS AND SAID ENGINEERS,NTED
?JiBRUARY 1,1952.
SECTION I:RREREAS,the Districts do require certain con
struction surveys,detailed inspection and material tests in
connection with the construction of the Ocean Outfall,both land and
narinc sections,in accordance with t~:c plans and specifications
:ubnittcd by thu Engineers Harrison &Uooliay,and Headman,Ferguson
&Carollo,and aDproved by thc Districts,or to ha submitted by said
Engineers and approved by the Districts,in the ease of the Land
Section,and
WHERiAS,said Engineers have indicated thair agreement to
porforn thu above work for a lunp sure fee of Eighty-two Thousand and
No/lOO ($82,000.00)Dollars,which sun inoludcs payment for work
already dons on the Narinc Section by said Engineers,as diroctcd by
unanimous notion of the joint Boards on October 22,1952,and
WhEREAS,it is for the best :uitcrests of the Districts and
or the expediting of the construction of said Ocean Outfall,both
land ond ma~ne sections,
NCW,TBEP2FORE,BE IT RESOLVED:That (Paragraph VIII)o:Y the
contract between the Districts and said En~iiscars,dated Februovy 1,
l~2 bc,and the soaie is hereby modified to provide for tnu pay~nent
said Engineers of the lunp sun foo of Eig}~ty—t~ro Taousand and
ia/laO (4~82,O00.0O)Dollars coveriri~work parfon~cd c:’to bu nc?$ormoc.
by said Enginoors in connection with construction s~u~detailed
~nspeotion to the satisfaction of the Chief Engineer ard General
lianager,and riatorial tests on thu eenstauotion of the Ocean Outfall,
both land and marina sections,in accordance with the plans and
apecifications submitted by said Engineers and approved by the
—1—
Dlstrict,of t~b.suiiitt~d by s~id Engineers arid approved by the
Districts,in the case of the land section1 said payrient to be made
as follows:~ight Thousand and No/l0O (~8,0o0.00)Dollars on or
before the 10th day of January,1953,and Ei;ht Thousand and No/lOO
(~,00O.OO)Dollars on each month thereafter for nine (9)months
until the sum of Severity—two Thousand and No/lOO (~72,OOO.OO)1~llo~’s
has been paid.The balance of Ten Thousand and No/l0O ($10,000.00)
Dollars shall be paid upon coripletion of the contracts for construc
tion and the acceptance thereof by tne Districts.If the construction
work is cclaplctecl and accepted by tbe Districts prior to the expira
tion of the torea above set forth,then any balance then remaining duo
~h~il be paid,
SECTION II:~HEREAs,a contract Is bein~negotiated between
idx1:~ino~rs ~ici ~ho Di~tricts ~l~.r~r suri~ccn;ract is cart—
tenpiated to replace the contract of February 1,1952,which said
new contract ~ias tentaviely approved by the Districts on October 1,
1952,r~nd it is desirable to provide for the correlation of this
riodification an~said proposed new contract,
N0~i,Th~iE1?0RE,DE IT RE~0LV~D:ihat in the everit a lump sum
~ijtract is approved and entered into between the Districts arid said
:n~ineers covering the joint wor~cs of said Districts as proposed and
tentatively appx~ved on October 1,1752,tLie payr~ents riade under this
modification ahail be credited to the Districts against the lump sum
provided in cai~contract,provided,however,that said proposed
contract is antered into prior to December 15,1952.
r~ferE~oin~resolution was passed and adopted at a rer~ular
~irno5 iaoet~~ia~of the Board of Diroctors of Ocunty Sanitation
~i:~r.ct ~io3 5 ,o~i tho 19th day of i’foveiaiber,1952.
~~2~/~/
SeorotE~ry,Bcar~6TD~r€ctors
County Sanitation D1s~rict No~5
Orange County,California
-2—
STATE OF CALIFORNIA)
ss
COUNTY OF ORANGE )
I,ORA MAE MERRITT,Secretary of the Board of Directors of
County Sanitation Listrict No.5 of Orange County,California,
do hereby certify that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.5 of Orange County,California,held on
the day of
,1952 by the following roil c311 y~~te:
AYES:Directors s*d~1 FitCh,WiUi~M~~arid
~.~aii~
NOES:
ABSENT:
IN WITN~BS WHEREOF,I have hereunto set my hand and affixed the
seal of County Sanitation District No.5 of Orange County,California.
this L:~th day of ~óW*1bO~~
,1952.
Secretary,Board of Direc~tors
County Sanitation District No~.f
Orange County,California
RESOLUTION NO.235.6
RESOLUTION OF THE BOASI)OF DIRECTORS OF
COUNTY SANITATION DISTRICTS 1505.1,2,
3,5,6,7 and 11 OF ORANGE COUBTY,
CALIFORNIA,PROVIDING FOR CERTAIN CON
STRUCTION SURVEYS,D~PAILED INSPECTION
AND MATERIAL ‘PESTS ON THE CONSTRUCTION
OF ThE OCEAN OUTFALL,50TH LAND AND MARINE
SECTIONS,AND PROVIDING AN INTERIM
MODIFICATION OF THE CONTitACT }SETWAEN T}2
DISTRICTS AND SAID ENGINEERS,NTED
FSBRTJARY 1,1952.
SECTION I:NiEREAS,the Distriqts do require certain con
struction surveys,detailed inspection and material tests in
connection with the construction of the Ocean Outfall,both land and
marine sections,in aecordrtnca with tue plans and specifications
:ubnittod by the Engineers harrison &lioolley,and Hoi.dnan,Ferguson
&Carollo,and aoprovad by thu Districts,or to he submitted by said
Engineers and approved by the Distracts,in the case of the Land
Section,and
WHEREAS,said Engineers have indicated their agreenent to
pcrforn the above work for a lump sun fee of Eighty-two Thousand and
No/100 ($82,000.00)Dollars,which sum includes payment for work
already •done on the Marine Section by said Engineers,as directed by
unanimous notion of the joint Boa~ds en October 22,1952,and
WHEREAS,it is for the best :~ntarosts of the Districts and
for the expediting or the construction of said Ocean Outfall,both
land end narine seotions,
NOW,THEREFORE,BE IT RESOLVED:That (Paragraph VIII)of the
contract between tHe Districts and said En~incljrs,d-ited Februat’y 1,
l’~2 bc,hnd the acne is hereby modified to orovide for toe pay~tent
said Engineers of the lump sun fee of Eighty—two Thousand and
io/loO (~2,O00.OO)Dollars coverin,z work perfon~ee or to he ne?Lernoc
L~soid Engineers in connection with construction 5’V1e1?detailed
tuspeotion to the satisfaction of the Chia~Engineer and General
iionagcr,and material tests en the eons emotion of the Ocean Outfall,
both land end marine sections,in accordance with the plans end
epecificat~ons submitted by said Engineers and approved by the
S
District,o~~c h omitt~h~j said Engineers and approved by the
Districts,in the case of the land section,said payment to be made
a~follows:Eight Thousand and i:o/lO0 (~8,000.00)Dollars on or
before the 10th day of January,1953,end Eic~ht Thousand and No/100
($8,000.00)Dollars on each rionth thereafter for nine (9)months
until the sur~of Seventy—two Thousand and No/l00 ($72,000,00)Do11e~s
has been paid.The balance of Ten Thousand and ~o/lOO (~l0,000.00)
Dollars shall he paid upon.completion of the contracts for construc
tion and the acceptance thereof by the Districts.If the construction
work is coa~p1eted and accepted by the Districts prior to the expira
tion of the tcrai above set forth,then any balance then remaining duo
‘bail be paid.
SECTION II:EEEAS,a contract is being negotiated between
~.id ~ho Districts ~1L~r1p sun co±iDra~t is con—
tcriplated to replace the contract of February 1,1952,which said
new contract was tentaviely approved by the Districts on October 1,
19~52,and it is desirable to provide for the correlation of this
xiodification and said proposed new contract,
N0~i,T~L;~i~i~0EE,DE IT RES0LVJ~D:That in the event a lurfp sun
~iitraet is approved and entered into between the Districts and said
:rigineers ooverin~the joint worhe o~said Districts as proposed and
tentatively approved on Oe~ob~r 1,l9~2,the pay~ents made under this
riodification shall be credited to bbs Districts a~ain8t the lusip sue
provided in caid contract,provided,however~that said proposed
contract is er:bered into prior to Decembor 15,1952.
Tno ft’rogoin~resolution was passed and adopted at a re~ular
•~ino5 ~~notj~i~of the Board of Directors of County Sanitation
~:.~ct i~O,6 ,on the 19th day of i’1ovoiiiber,1952.
Secret~ry,Board.of Direct rs
County Sanitation Dis~rict No,6
•Orange Count~’,California
—
S
STATE OF CALIFORNIA)
V
V
ss
COUNTY OF ORANGE
I,ORA MAE MERRITT,Secretary of the Board of Directors of
County Sanitation District Nob 6 of Orange County,California,
do hereby certify that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.6 of Orange County,California,held on
the ~day of ~,1952 by the following roil.c~li vr-~.te:
AYES:Directors A.i~,~n.;~,~er c~I
~r~n ~~tUer
NOES:
ABSENT:
IN WITNESS WHEREOF,I have hereunto set my hand and affixed the
seal of County Sanitation District No.6 of Orange County~California.
this tith day of ~,1952.
~~
Secretary,Board of Dir~ctors
County Sanitation District No.6
Orange County,California
•rn~3~
RESOLUTION NO,23 5—7
RESOLUTION OF THE BOARD OF DIRECTORS OF
COUNTY SAI’IITATION DISTRICTS NOS.1,2,
3,5,6,7 and 11 OF ORANGI COUNTY,
CALIFORNIA,PROVIDING FOR CERTAIN CON
ST&IJCTION SURVEYS,DETAILED INSPECTION
AN))MATERIAL TESTS ON THE CONSTRUCTION
OF THE OCEAN OUTFALL,ROTH LAND AND MARINE
SECTIONS,AND PROVIDING AN INTERIM
MODIFICATION OP THE CONThACT BETWEEN TIE
DISTRICTS AND SAID ENGINEERS,DATED
F:LBRUARY 1,1952.
SECTION I:WLEREAS,the Districts do require certain con
struction survays,detailed inspection and material tests in
coithection with the construction of the Ccoan Outfall,both land and
marine sections,in accordance with the plans and specifications
~ubnittcd by tb-c Enginoers Harrison &IJoolley,and Headman,Ferguson
&Carollo,end approved by tin;Districts,or to he submitted by said.
Engineers and approved by the Districts,in the case of the Land
Section,and
WEEBI’AS,said Engineers have indicated their agreement to
perform the above work for a lump sun fee of Eighty-two Thousand and
No/100 ($821000.00)Dollars,which sun includes payment for work
already done on the Marinc Section by said Engineers,as directed by
unaninous notion of the joint Boards on October 22,1952,and
14EEBEAS,it is for the best interests of the Districts and
for the oxpoditing of the construction of said Ocean Outfall,both
land and naMno sections,
NOW,ThEREFORE,BE IT RESOLVED:That (Paragraph VIII)oT the
contract between the DIstricts and said Engineers,dated Fabrua~y 1,
l~2 be,and the sone is hereby modified to provide for thu peyuir~nt
said Engineers of bh~lump sun foe of Eig1~ty—t’ra Taousand and
io/lOO (~2,OO0.OO)Dollars coverhig woric porfoniLd or to he nc:ormo(
hi said Enginoors in connection with construction sr-1 detailed
-
inspection to the satisfaction of the Chia~’Engineer and General
-hanagur,and matcrial tests on the ae~istruotion of the Ocean Outfall,
both land cnd mann~sections,in accordance with the plans end
epeeifications submittod by said Enginocrs and approved by the
.-1—
District,o~~a b omitt~,d by said Enc~ineers and approved by the
Districts,in the case of the land section,said payment to be n!ade
as follows:Eight Thousand and IIo/l00 (~8,000,00)Dollars on or
before the 10th day of January,1953,and Eight Thousand and No/l00
(~8,000.00)Dollars on each month thereafter for nine (9)months
until the sun of Seventy~two Thousand and No/100 (~72,0O0.0O)Doila:s
has been paid.The balance of Ten Thousand and No/100 ($10,000.00)
Dollars shall be pa~.d upon coripletion of the contracts for construc
tion and the acceptance thereof b~tne Districts.Il’the construction
work is coiapleted.and accepted by the Districts prior to the expira
tion of the torn above set forth,then any balance then remaining due
~iell be paid.
SECTION II:WHEREAS,a contract is heiru~nec~otiated between
seid~~n~in:ors :~.j~V thu Districts ~:n.L~a lane s~m contruot is con—
teriplated to replace the contract of February 1,1952,which said
new contract was teritaviely approved by the Districts on October 1,
19~2,and it is desirable to provide for the correlation of t~1is
riodification and said proposed new contract,
NOh,T~u~For~E,DE IT RES0LV~):Ihat in the event a lump sum
~iitract is approved end entered into betweun the Districts and said
ngineers covering the joint works of said Districts as proposed and
Lentativel~approved on October 1,19~2,the payments made under this
modification shall be credited to the Districts against the lump sum
provided ~i1 said cor~tract,provided,however,that said proposed
contract is entered into prior to December 15,1952.
~feragoing resolution was passed and adopted at a rer~u1ar
)~1rflo~1:iC.Ct2.ii~of the Board of Directors of County Sanitation
~:~c~.’ct Po~7 ,on the 19th day of November,1952.
—
Secrot&ry,Board of D~recto~rs
County Sanitation District No,
Orange County,California
—2—
STATE OF CALIFORNIA)
55
CQ~J~TY OF ORANGE )
I,ORA MA~MERRITT,Secretary of the Board of Directors of
County Sanitation IJistrict No.7 of Orange County,California,
do hereby certif~r that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.of Orange County,California,held on
the 19th day of Nov~Xflb~X~
,1952 by the fo1iow~n.g r~li cciii y~te:
AYES:Directors V~.ncent L.Hu~ii~ston,.J.I~.I~e~3r~e
and ~U1is H.IJarner
NOES:None
ABS ENT:i~onc~
IN WITNESS WHEREOF,I have hereunto set my hand and affixed the
seal of County Sanitation District No.7 of Orange County,California.
this 19th day of November
~1952.
.1
.Secretary,Board of Direc~tdrs
County Sanitation District No.
-~.Orange County,California
—3-,
235.41RESOLUTIONNO.
RESOLUTION OF THE BOARI)OF DiU3CTORS OF
COUI’Tfl SAlUTATION DISTRICTS 1105.1,2,
3,.5,6,7 and 11 OF ORA3TGTC cOUNTY,
CALIFORNIA,PROVIDING FOR CERTAIN CON
STRUCTION SURVEYS,D~PAIL;2D INSPECTION
AND MATERIAL TESTS ON THA CONSTRUCTION
OF ThE OCEAN OUTFALL,130TH LAND AND MARINE
SECTIONS,AND PROVIDING All INTERIM
3JODIFICATION OF .flfl}~1 CONTRACT }3RTWEE’N TRE
DISTRICTS AND SAID ENGINEERS,DATED
FEBRUARY 1,1952,
SECTION I:NIIEREAS,the Districts do require certain con
struction surveys,detailed inspection and noterial tests in
connection witb the construction of the Ocean Outfall,both land and
marine sections,in accordance with tee plans and specifications
:ubmittcd by the Engineers Harrison &Woolley,and Fe cs-era,Ferguson
&Carollo,and anprovad by th~Districts,or to be subnitted by said
Engineers and approved by the Districts,in the ease of th~Land
Section,and
WEE~LAS,said Engineers have indicated their agrecnent to
perfonu the above work for a lump sure fee of Eighty-two Thousand and
Nc/lOO ($82,000,00)Dollars,which sun includes payment for work
already donc on the Marine Section by said Engineers,as directed by
unaninous notion of the jo-tnt Hoards on October 22,1952,and
WHEREAS,it is for the best :.ntsrcsts of the Districts and
for the expeditinR of the construction of said Ocean Outfall;both
land arid naidne sections,
NOW,THEREFORE,BE IT RESOrXt3D:That (Paragraph VIII)of trio
~ontract between tl:e Districts arid said Engineers,dated Fabrua’~y 1,
l5~2 be.and the seine is nereby nodified to provide for the paycient
said En~incers of the lurip stir.fee of Eighty—tan Tlicus and and
ie/lOO ($82,000.00).Dollarn covering work perfonac’or to bc ~
t~said Engineers in connection with construction s’rie~e detailed
inspection to the satisfaction of the Chief frigineer and General
Reneger,and material tests on the eenstiuetion of the Ocean Outfall,
both land and narin~sectiens,in accordance with the plans end
cpeoifications submitted by said Engincars and approved by the
-1—
District,o~’b~t~somitt~by s~jd Engineers and approved by the
Districts,in the case of the land section,said pa~rient to be made
as follows:Eight Thousand and 110/100 (~8,000.00)Dollars on or
before the 10th day of January,1953,and Eight Thousand and No/l0O
(~b,0OO.O0)Dollars on each month thereafter for nine (9)Ieonths
until the sun of Seventy—two Thousand and No/l00 ($72,000.00)~lla~e
has been paid.The balance of Ten 2hous~nd and No/l00 (~10,000.00)
Dollars shall he paid upon completion of the coritract~for construc
tion and the adoeptance thereof by ttie Districts.If the construction
work is con~p1eted and accepted by the Districts prior to the expira
tion of the tenu above set forth,then any balance then remaining duc
‘hall be paid,
SECTION II:~cIHEREAS,a contract is being negotiated between
30i.dxlincors ;~i~V bho Districts ~~urir sun-contract is con—
toriplated to replace the contract of February 1,1952,which said
new contract was tentaviely approved by the Districts on October 1,
1952,and it is desirable to provide for the correlation of this
nodification and said proposed new contract,
N0~.i,T-h~Ei~0RE,13E IT RESOLV~O:That in the event a luiup sun
-~ntraet is approved and,entered into hetwe~n the Districts and said
:ngineers covering tile joint wori~s of said Districts as proposed and
tentative1~approved on October 1,1952,the paynents made under this
modification shall be credited to the Districts against the lump sum
provided in said.contract,provided,however,that said proposed
contract is ortered into prior to Docembor 15,1952.
rpj~foregoing resolution was passed and adopted at a regular
:~c:-,uried 1;J~Ctifl~of the Board of Directors of County Sanitation
j~.iet iTo,11 ,on the 19th day of November,19~2,
Secrotory,Board of Directors
County Sanitation District No.~
Orange County,California
-2—
STATE OF CALIFORNIA)
ss
COUNTY OF ORANGE )
I,ORA MAE MERRITT,Secretary of the Board of Directors of
Ii
County Sanitation Jjistrict No.of Orange County,California,
do hereby certify that the foregoing Resolution was passed and
adopted at a regular meeting of the Board of Directors of County
Sanitation District No.of Orange County,California,held on
19th Novenber
the day of
,1952 by the folio~iing roll.c311 v()te~
Vernon E.Langc~nbeck,i~oy-Ssabrid~e and
AYES~Directors
-Uillis Ii.~‘Jarner
NOES:
None
ABSENT:
tfl
IN WITWESS WHEREOF,I have hereunto set my hand and affixed the
seal of County Sanitation District No.11of Orange County,California.
•
19th flovember
this day of
,1952.
•Secretary,Board of Diredtors ii
County Sanitation District No.
Orange County,California