Loading...
HomeMy WebLinkAboutResolution 1952 - 0209-1RESOLUTION NO.209.]. A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY SANITATION DISTRICT NO.1 OF ORANGE COUNTY,CALIFORNIA, ACTING FOR ITSELF AND AS CONTRACTING AGENT FOR COUNTY SANITATION DISTRICTS NOS.2,3,5,6,7 AND 11 OF ORANGE COUNTY,CALIFORNIA,AWARDING A CONTRACT FOR THE CONSTRUCTION OF THE OCEAN OUTFALL SEWER (MARINE SEC TION)TO THE HEALY-TIBBITTS CONSTRUCTION CO~4PANY;DI RECTING THE DISTRICTS ATTORNEY TO PREPARE CONTRACT AND BONDS THEREFOR;AND DIRECTING THE CHAIRMAN OF THE BOARD OF DIRECTORS TO ENTER INTO SAID CONTRACT;AND REJECTING ALL OTHER BIDS. The Board of Directors of County Sanitation District No.1 of Orange County,California acting for itself and as Contracting Agent for County Sanitation Districts Nos.2,3,5,6,7 and 11 of Orange County,California,does hereby resolve: SECTION I:That the contract for the construction of the Ocean Outfall Sewer (Marine Section)for County Sanitation Districts Nos. 1,2,3,5,6,7 and 11 of Orange County,California,be and the same is hereby awarded to the Healy-Tibbltts Construction Company, in accordance with the terms of their bid,which bid is hereby de termined to be the lowest and best bid,therefor dated July 23, 1952,as follows,to-wit: Proposal No.1,First Alternate Item No.Item Dollars Cents 1.Furnish and install steel sheet 6 Ob piling to be left in place to protect the pipe as indicated on the plans,from eta.0 /00 to sta.17 /50,per square foot 2.Excavate between the two lines 1 00 of steel sheet piling,from sta.0 /00 to sta.17 /50,per cubic yard 3.Excavate in open cut outside the 2 50 two lines of steel sheet piling, from eta.0 /00 to eta.17 /50, per cubic yard 4.Excavate 1~open trench,from eta.4 00 17 /50 to eta.60 /00,per cubic yard 5.Excavate in.open trench,from sta.4 00 60 /00 to sta.65 /00,per cubic yard 6.Excavate in open trench,from eta.4 00 •65 /00 to eta.70 /00,per cubic yard —1— Item No.Item 7.Furnish and place gravel bedding between~two lines of steel sheet piling,from sta.0 /00 to sta. 17 /50,per ton 11.Furnish and install gravel bedding for diffuser at: (a)sta.70 /00,per ton (b)sta.65 /00,per ton (c)sta.60 /00,per ton Purnish and place auarry run stone Class “D”(6”max.)in subgrade between two lines of steel sheet piling,from sta.0 /00 to sta.17 /50,per ton Furnish and place quarry run stone Class “C”(12”max)for side ar~d top cover for pipe between two lines of steel sheet piling,from sta.0 /00 to sta.17 /50,per ton 14.Furnish and place quarry run stone Class “C’(12”max)for side pro tection of pipe in open trench from sta.17 /50 to sta.60 /00,per ton 15.Furnish and place quarry run stone,Class “C”(12”max.)for side protection of pipe in open trench from sta.60 /00 to sta.65 /00,per ton 16.Furnish and place quarry run stone Class “C”(12”max)for side protection of pipe in open trench from sta.6~/00 to sta.70 /00,per ton 17.Furnish and install quarry run stone Class “C”(12”max.)around diffuser at: (a)sta.70 /00,per ton (b)sta.65 /00,per to~i (c)sta.60 /00,per ton 18.Furnish and place quarry stone Class “B”(1’to 2’in size )for cover through the breaker area from sta.0 /00 to sta.16 /25 per ton Dollars 8 Cents 00 12. 13. 8.Furnish in open to sta. and place gravel trench,from sta. 60 /00,per ton bedding 17 /50 • 8 00 9.Furnish in open to sta. and place gravel trench,from sta. 65 /00,per ton bedding 6o /00 8 00 ~ 10.Furnish in open to sta. and place gravel trench,from sta. 70 /00 per ton bedding 65 /00 10 00 10 00 10 00 10 00 8 00 7 00 10 00 10 00 10 00 10 00 10 00 10 00 8 00. -2- Item No.Item Dollars Cents 19.Furnish and place quarry stone,8 00 Class “A’,(2’to 3 in size)for cover cap rock through the breaker area,from sta.0 /00 to eta.11 /00, per ton, 20.Furnish and install 78’I.D.155 00 First Reinforced Concrete Pipe in 2~ft. Alter-lengths with semi-flexible cast iron nate joints complete with rubber gaskets and manholes,as specified,from eta. 0 /00 to sta.18 /00,per linear foot 21.FurnIsh and install 78”I.D.170 00 First Reinforced Concrete pipe in Alter-2~4 ft.lengths with semi-flexible nate cast Iron joints complete with rubber gaskets and manholes,as specified, from sta.18 /00 to eta.60 /00,per linear foot 22.Furnish and install 78”I.D.100 00 First Reinforced Concrete Pipe in 2~4 ft. Alter-lengths with semi-flexible cast nate iron joints complete with rubber gaskets and manholes,as specified, from eta.60 /00 to sta.65 /00, per linear foot 23.Furnish and install 78”I.D.100 00 First Reinforced Concrete Pipe In Alter-2~1 ft.lengths with semi~f1exible nate cast iron joints complete with rubber gaskets and manholes,as specified,from eta.65 /00 to eta. 70 /00,per linear foot 2L~.Furnish and install diffuser corp. plete,as shown in the plans,at: (a)sta.70 /00,lump sum 7500 00 (b)sta.65 /00,lump sum 7500 00 (c)sta.60 /00,lump sum 7500 00 25.Remove obstructive rock as directed 30 00 by the Engineer,per cubic yard 26.FurnIsh and place additional stone 20 00 as directed by the Engineer,per ton THE ABOVE BID PRICES FOR SEPARATE ITEMS COMPLETE IN PLACE IN CLUDE ALL FEDERAL,STATE AND CITY TA)~S APPLICABLE TO THE WORK. SECTION II:That the District’s Attorney is hereby directed to prepare a contract for said Healy-Tlbbitte Construction Company with bond for faithful performance to accompany same,which bond shall be in the sum of not less than $2,OL~7,8OO for faithful performance of the contract and a second bond in the sum of not less than $1,023,900 to guarantee payment of all claims for labor -3- and material furnished;that said contract shall provide that the work be completed within three hundred sixty (360)calendar days from the date of the contract;said contract shall also provide that progress pa~,ments will be made for work completed as of the first day of each rionth in the manner in which other bills of the District are paid. SECTION III~That the contract be awarded on the basis of the construction of the Ocean Outfall Sewer to Station 70 ~00 as shown on the plans and specifications therofor adopted by Resolution No. of the Board of Directors of said District No.1 with a provision in the Contract to ~itomatically eliminate from said Contract for Proposal No.1,First idtemate,item nec.~,6,9, 10,i5,16,22 and 23,thereby reducing the length of the Ocean Outfall Sewer (Marine Section)from a total length of 7000 ‘feet to a length of 6000 feet at the end of sixty (60)days from the date of the Contract if said County Sanitation Districts Nos. 2,3,~,6,7 and 11 acting through said County Sanitation District No.1 does not reaffirm the provisions of the Contract providing for the Ocean Outfall (Narine Seotion)be constructed to a total length of 7000 feet. SECTION IV:That the Chairman of the Board of Directors is hereby directed to enter into said contract with Healy—Tibbitts Construction Company in behalf of County Sanitation District No.1 of Orange County,California,acting for itself and as Contracting ~gent for said County Sanitation Districts Nos.2,3,~,6,7 and 11 of Orange County,California. SECTION V:That all other bids for the construction of the Ocean Outfall Sewer (Marine Seotton)be and the same are hereby rejected and the Secretary of the Board is hereby directed to re turn cashierts checks,certified checks or bidder!s bonds to the unsuccessful bidders. SECTION VI:That payment for the ~rk to be done under the provisions of the hereinabove authorized Contract chargeable to said County Sanitation District No.1,be made from the Construc tion i~nd of said County Sanitation District No.1 in the manner heretofore agreed by and between said County $anitation Districts 1,2,3,S,6,7 and :i.1. —14... The foregoing resolution was passed and adopted at a regular adjourned meeting of the Board of Directors of County Sanitation District No.One on the 7th day of August,1952. c~~ Secretary ~pr6~teth,Bo~rd 6f Directors County Sanitation District No.1 Orange County,California STATE OF CALIFOANIA) as COUNTY OF ORANGE I,RAYMOND ii.RIDAL,Secretary pro tern of the Board of Directors of County Sanitation District No.One of Orange County, California,do hereby certify that the foregoing r.~olution was passed and adopted at a regular adjourned meeting of the Board of Directors of County Sanitation District No.One of O~-ange County,California,held on the 7th day of August,1952,by the following roll call vote: AYES:Directors J.L.McBride,Willis H.Warner and Courtney F.Chandler. NOES:None ABSENT:None IN WITNESS WHEREOF,I have hereunto set my hand and affixed the seal of Co mty Sanitation District No.One of Orange County, California,this 7th day of August,1952. Secretary~~I~,Board o Directors County Sanitation District No.1 Orange County,California —5--