HomeMy WebLinkAboutMinutes 1963-06-246-24-63
DISTRICT NO.2
7:00 p.m.,June 24,1963
MINUTES OF THE ADJOURN~REGULAR MEETING
Council Chambers.
City Hall
Fullerton,California
Pursuant to adjournment of the regular meeting on June 12,
1963,the Board of Directors of County Sanitation District No.2
ó~Orange County,California met in an ad4ourned regular meeting
at 7:00 p.m.,June 2k,1963 in the Council Chamber’s,City Flail,
Fullerton,California.
The Chairman called the meeting to order at 7:00 p.m.The
roll was called and the Secretary reported a quorum present.
Directors present:Rex A.Parks (Chairman),Joseph Callens,
Howard Cornwell,James Workman,Royal
Thibbard,James Hock,Dean Shull and
C.M.Featherly
Directors absent:Rector Coons,Norman Culver and Lloyd
Reese
Others present:Lee M.Nelson,Paul G.~own,~
Galloway,Forrest Yaberg,E.H.
Finster,Harold Bousman,Thornton
Piersall and Fred A.Harper,Secretary
Report of the Engineers The General Manager reviewed the
and General Manager on historical background on the
the proposed repair or construction and re-construction
the Euclid Avenue Truriic of portions of the Euclid Avenue
Trunk.The section of thé~sewer
presently under consideration for repair isa 24”concrete
pipe which was installed approximately thirty-nine years ago
•in Euclid Avenue between La Palma and Orangethorpe in the
Cities of Anaheim and Fullerton.All other sections of the
Euclid Avenue Trunk Sewer have been replaced with vitrified
clay line pipe through the years by the J.O.S.
The Chair then recognized Mr..Conrad Hohener,representing
•J.R..Lester Boyle and Sidney L.Lewry,a joint venture,
District’s Engineers,,who presented two plans for the Directors
•to consider.
Plan #1 proposes to divert the major portion of the sewage
flow from the Euclid Avenue Trunk Sewer by means of a
diversion manhole at Euclid and Orarigethorpe westerly to the
Magnolia Trunk Sewer.This will require the purchase of
capacity rights In a sewer located in Orangethorpe ~hich is
presently owned by the City of Fullerton and build±nj a
•paralleling 18”sewer line In Orangethorpe Avenue when the
sewage flow surpasses the capacity rights acquired in the City-
owned Orangethorpe Avenue.
—1—
6-24-63
0
This plan also provides for the replacement of the existing
Euclid Avenue Trunk Sewer between Orangethbrpe and La Pa].ma
with a smaller vitrified clay pipe sewer to serve the local
area in that the heavy sewage flows,from the northern part
of the District would be diverted to the Magnolia Trunk
Sewer.The engineers estimate that this project couldbe
accomplished for $336,000 plus the cost of acquiring capacity
rights in the existing City of Fullerton Orangethorpe Avenue
Sewer.
Plan #2 involves the re—construction of the Euclid Avenue
Trunk Sewer from Plant #1 to Orangethorpe Avenue at an
estimated expenditure by the District of $1,655,000.The
engineers advise that this project should,if undertaken,
be begun at Plant #1 and be constructed northerly.
Following a general discussion by the Directors it was
concurred that the Board should follow Plan #1 as outlined
by the engineers.
Discussion of the repair to Following an extensive
be m~dé to theT~I1d Avenue discuSsion by the Directors
line etween~Orangethorpe and and questions dnswered by
La ~E’alma the General Manager and the
engineers9 the engineers
~presented the following estimate for repair of the Euclid
Trunk Sewer between Orangethorpe and La Palma.
(1)To line the existing 24”concrete sewer pipe with 3/41
concrete lining the estimate is $77,000.00
~
-~‘~:c’~(2)To replace the existing cement sewer between Orange-
thorpe and La Palma at the existing elevation and
\\~‘grade with 21”and 18”Vitrified Clay Pipe the
eStimate is $104,000.00
(3)To replace the existing facility between Orangethorpe
\~‘-..••-~and La Pa]~na with 24”vitrified clay pipe at the same
grade and elevation the engineers’estimate i~.~$l22,000.00~
Following a discussion of the pros and cons of the concrete
lining versus the installation of new vitrified clay pipe,
the General Manager recommended to the Directors that the
existing 24”concrete sewer be replaced with a 24”vitrified
clay pipe sewer.
It was then moved,seconded and duly carried:That the
General Manager be directed to instruct the engineers to
prepare plans and specifications for construction of the 24”
vitrified clay pipe sewer to replace that portion of th’e—/
Euclid Avenue Trunk Sewer between Orangethorpe anc~La Palma.
Adoption of l963.~l9614 Following a review of the budget
presented to the Directors by
the staff,it was moved,seconded
0
1’
L
1’
Ii
and carried by roll call vote
That the 1963-1964 fiscal year budgets for funds of County
Sanitation District No.2 and 2A of Orange County,California,
recommended by the District’s member of the B~cecutive Committee
and submitted to this Board of Directors this 2~th day of
Ju~ie,1963,be and they are hereby approved and adopted in
the following total amounts,and said budgets are hereby
ordered filed in the office of the Secretary of the District:
0
-2-
6-24-63
DISTRICT NO.2
Operating Fund Budget $934,912.
1958 Bond,Interest &Sinking Fund Budget 1,038,412.
Construction Fund Budget 943.
Accumulated Capital Outlay Fund Budget 2,351,842.
DISTRICT NO.2 AI~TJ)2A
1951 Bond,Interest &Sinking Fund Budget $129,319.
Fixed Obligations Fund Budget 26,83].
The Chairman or Chairman pro tern of the Board of Directors is
hereby authorized and directed to sign said budgets;and
The required copies of said approved and signed budgets are
hereby ordered transmitted to the County Auditor.
Adjournment Moved,seconded and duly carried:
That this meeting of the Board of Directors of County
Sanitation District No.2 be adjourned.
Whereupon the Chairman declared the meeting so adjourned
at 9:00 p.m.,June 24,1963.
Chairman,Board of~Directors of
County Sanitation District No.2
of Orange County,California
APPEST:
Secretary,Board ofDlrectors of
County Sanitation District No.2
of Orange County,California