HomeMy WebLinkAboutDistrict 01 Minutes 1952-08-07MINUTES
REGULAR MEETING.,ADJOURNED SESSION
BOARD OF DIRECTORS
COUNTY SANITATION DISTRICT NO.1
ORANGE COUNTY,CALIFORNIA
August 7,1952 at 5:00 p.m.
Room 239,1104 West Eighth Street
Santa Ana,California
The Boards of Directors of County Sanitation Districts Nos.
1 and 11 met in joint session,pursuant to adjournment of the
meeting held on August ~,],.952 at the hour of 5:00 p.m.on
August 7,1952 in Room 239 at ~1O4 West Eighth Street,Santa Ana,
California.
Chairman Chandler called the meeting of the Board of Dir
ectors to order at 5:05 p.m.
In the absence of the Secretary,the Chairman d1récte~dMr.
Raymond R.Ribal to serve as Secretary pro tern of the Board of
Directors of County Sanitation District No.1.
The roll was called and the Secretary reported a quorum of
the Board to be present.
Courtney H.Chandler (Chairman)
Willis H.Warner
J.L.McBride
None
Others present:Rayn-~ç~d R,Ribal
Harry Ashtqn
K.J.Harrison
J.A.WoolLey
________________
The Board qf Directors adopted Resolu
________________
tion No.2O7.~1,authorizing certain
___________________
rnodiuication~in the plans and speci
________________
fications for the Ocean Outfall Sewer,
_________________
~arine Section.Certified copy of
this resolution is attached hereto and
made a part Of these minutes,
Award of Contract Pursuant to adoption of Resolution No.
for coñstruct~on 206 by the Boards of Directors of County
of Marine Section Sanitation Districts Nos.1,2,3,5,6,
of the Ocean Out 7 and 11 authorizing District No.1 to
-fall Sewer award a contract to the lowest bidder,
the Board of Directors of County Sani
tation District No.1 adopted Resolution No.209-1,awarding
contract to H~a1y ~‘ibbitt~Copptructiori Company for the con
struction of the marine section of t}i~Oceap Qutf~1 Sewer,
and authorizing the Chairman to execute this contract.
Certified copy of this resolution is attached hereto and made
a part of these minutes,
Ad.lournment The Board of Directors took the following
action:
2E8
Directors present:
Directors absent:
Modification of
Plans and Specifi
cations for the
Ocean Outfall,
—
Marine Section
-1—
269
Moved by Director Warner,seconded by Director
McBride and duly carried:
That the meeting be adjourned.
Whereupon the Chairman declared the meeting of the Board
of ~irectors oI’County Sanitation District No.1 so adjourned at
5 ;16 p.m.
Ch~lrthan/~o~d of ~irectors
County Sanitation District No.1
Orange County,California
ATTEST:
sc~2L
Secré~~~o teth,Board of Diredtor~
County Sanitation District No.1
Orange County,California
—2—
•270
RESOLUTION NO.207—1
A RESOLUTION OF ~{E BOARD OF DIRECTORS OF COTJNTY
SANITATION DISTRICT NO.1 OF ORANGE COUNTY,CALIF
ORNIA,MODIFYING PLANS AND SPECIFICATIONS FOR THE
OCEAN OUTFALL SER (MARINE SECTION).
WHEREAS,the Design !~ngineers,Harrison and Woolley,
Headman,Ferguson and Carollo,have presented detailed plans
and specifications for the construction of the Ocean Outfall
Sewer (Marine Section)and the Board of Directors of County
Sanitation District No.1 of Orange County,California,by
Resolution Mo~17L1—l,dated June 18,19~2,has adopted and
ordered said plans and specifications filed in the office of
the Secretary,and
WHEREAS,there are incorporated therein and recommended by
the Chief Engineer and General Manager certain changes in the
alignment,size of pipe and grade of said pipe for that portion
of the ~ork included in the Engineer’s report dated December 22;
19L~8 and shown on Exhibit L~A of said Engineer’s report,and
WRI~EAS,such changes and mod,ifi~ations are necessary be
cause of the change of conditions since the original report was
filed and best serve the public interest,NOW TE~REFORE,BE IT
RESOLVED:That the Board of Directors of County Sanitation
pistrict No.1 of Orange County,California,hereby finds and
declares that the public interest requires the changes of the
general plans and the work of the District by changing the align
ment,size of pipe and grade of said pipe for the Ocean Outfall
Sewer (Marine Section),all within the County of Orange,Calif
ornia as shown on the aforertiontioried detailed plans and specifi
cations for Proposal No.1,First Alternate.
The foregoing resolution was passed and,adopted at a
regular meeting of the Board of Directors of County Sanitation
District No.1
,on the 7th day of August ,19~2.
‘Secretary pro tern,Board of Directors
County Sanitation Distr.ict NO.
Orange County,California
271
STATE OF CALIFORNIA)
ss
COUNTY OF ORANGE
I,RAYIVIOND R.RIBAL,Secretary pro tern of the Board of
Directors of County Saritation Dis~rict Number One of Orange
County,California,do hereby certify that the foregoing
resolution was passed and adopted at a regular adjourned
meeting of the Board of Directors of County Sanitation District
Number One of Orange County,California,held on the 7th day
of August,1952,by the following roll call vote:
AYES:Directors J.L.McBride,Willis H.Warner and
Courtney R.Chandler
NOES:None
ABSENT:None
IN WITNESS WHEREOF,I have hereunto set my hand and affixed
the seal of County Sanitation District Number One of Orange
County,California this 7th day of August,1952.
tern,Board of DirectoT~
County Sanitation District No.1
Orange County,California
-2-.
RESOLUTION NO.2O9~1 272
A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY~
SANITATION DISTRICT NO.1 OF ORANGE COUNTY,CALIFORNIA,
ACTING FOR ITSELF AND AS CONTRACTING AGENT FOR COUNTY
SANITATION DISTRICTS NOS.2,3,5,6,7 AND 11 OF
ORANGE COUNTY,CALIFORNIA,AWARDING A CONTRACT FOR THE
CONSTRUCTION OF THE OCEAN OUTFALL SEWER (MARINE SEC
TION)TO THE 1jEALY.-TIBBITTS CONSTRUCTION COMPANY;DI
RECTIWG THE DISTRICT’S ATTORNEY TO PREPARE CONTRACT
AND BONDS THEREFOR;AND DIRECTING THE CHAIRMAN OF THE
BOARD OF DIRECTORS TO EI~1TER INTO SAID CONTRACT;AND
REJECTING ALL OTHER BIDS.
The Board of Directors of County Sanitation District No.1 of
Orange County,California acting for itself and as Contracting
Agent for County Sanitation Districts Nos,.2,3,5,6,7 and 11 of
Orange County,California,does hereby resolve:
SECTION I:That the contract for the construction of the Ocean
Outfall Sewer (Marine Section)for County Sanitation Districts Nos.
1,2,3,5,6,7 and 11 of Orange County,California,be and the
same is hereby awarded to the Healy-Tibbitts Construction Company,
in accordance with the terms of their bid,which bid is hereby de
termined to be the lowest and best bid~therefor dated July 23,
1952,as follows,to-wit:
Proposal No.1,Fii’st Alternate
Item
No.Item Dollars Cents
1.Furnish and install steel sheet 6 00
piling to be left in place to
protect the pipe as indicated
on the plans,from sta.0 /00
to sta.17 /50,per square foot
2.Excavate between the two lines 1 00
of steel sheet piling,from
,sta,0 /00 to sta.17 /50,per
~1cubic yard
3.Excavate in open cut outside th€~2 50
two lines of steel sheet piling,
from eta.0 ,t 00 to sta.17 /50,
per cubic yard
Excavate in open trench,from sta.00
17 /50 to sta.60 /00,per cubic
yard
5.Excavate in open trench;from sta.21 00
60 /00 to sta.65 /00,per cubic
yard
6.Excavate in open trench,from sta.24 00
65 /00 to eta.70 /00,per cubic
yard
—1—
273
Item
No.Item Dollars Cents
7.Furnish and place gravel bedding 8 00
between tWo lines of steel sheet
piling,from sta.0 /00 to eta.
17 /50,per ton
8.Furnish and place gravel bedding 8 00
in open trench,from sta.17 /50
to eta.60 /00,per ton
9.Furnish and place gravel bedding 8 00
in open trench,from sta.60 /00
to eta.65 /00.,per ton
10,Furnish and place gravel bedding 10 00
in open trench,from sta.65 /00
to eta.70 /00 per ton
11.Furnish and install gravel bedding
for diffuser at:
(a)eta.70 /00,per ton 10 00
(b)sta.65 /00,per ton 10 00
(c)sta.60 /00,per ton 10 00
12.~‘urnish and place ouarry run 8 00
stone Class “D”(6”max.)in
subgrade between two lines of steel
sheet piling,from sta.0 /00 to
sta.17 /50,per ton
13.Furnish and p’ace qv.arry r~n stone 7 00
Class “C”(.12”max)for side and
top cover for pipe between two
lines of steel sheet piling,from
eta.0 /00 to eta.17 /50,per ton
14.Furnish and place quarry r~n stone 10 00
Class “C’(12”max)for sije pro
tection of pipe in open trench from
eta.17 /50 to eta.60 /00,per ton
15.Furnish and place quarry run 10 00
stone,Class “C”(12”max.)for side
protection of pipe in open trench from
eta.60 /00 to eta.65 /00,per ton
16,Furnish and place quarry run stone 10 00
Class “C”(12”max)for si.de protection
of pipe in open trench from eta.65 /00
to sta,70 /00,per ton
17.Furnish and install quarry run stone
Class “C”(12”max.)around diffuser
at:
(a)st~.70 /00,per ton 10 00
(b)sta.65 /00,per ton 10 00
(c)sta.60 /00,per ton 10 00
18.Furnish and place quarry stone 8 00
Class “B”(i’to 2’in size )for
cover through the breaker area
from eta,0 /00 to sta.16 /25 per ton
-2-
27~
Item
No.Item Dollars Cents
19.Furnish and place quarry stone,8 00
Class uA~I,(2’to 3 in size)for
cover cap rock through the breaker
area,from eta.0 /00 to sta.11 /00,
per ton
20.Furnish and install 78”I.D.155 00
First Reinforced Concrete Pipe in 24 ft.
Alter-lengths with semi-flexible cast iron
nate joints complete with rubber gaskets and
manholes,as specified,from eta.
0 /00 to sta.18 /00,per linear foot
21.Furnish and ins~al1 78”I.D.170 00
First Reinforced Concrete pipe in
Alter-2~4 ft.lengths with semi-flexible
nate cast iron joints complete with rubber
gaskets and manholes,as specified,
from sta.18 /00 to sta.60 /00,per
linear foot
22.Furnish and install 78 I.D.100 00
First Reinforced Concrete Pipe in 24 ft.
Alter-lengths with semi-flexible cast
nate iron joints complete wIth rubber
gaskets and manholes,as specified,
from eta.60 /00 to sta,65 /00,
per linear foot
23.Furnish and install 78”I.D.100 00
First Reinforced Concrete Pipe in
Alter-24 ft.lengths with ~
nate cast iron joints complete with
rubber gaskets and manh~1es,as
specified,from sta.6~/00 to eta.
70 /00,per linear foot
24.Furnish and install diffuser corn
plete,as shown in the plans,at:
(a)eta,70 ,/00,lump sum 7500 00
(b)sta.65 /00,lump sum 7500 00
(c)eta.60 /00,lump sum 7500 00
25.Remove obstructive rock as directed 30 00
by the Engineer,per cubic yard
26.Furnish and place additional stone 20 00
as directed by the Engineer,per ton
THE ABOVE BID PRICES FOR SEPARATE ITEMS ~0MPL~TE IN PLACE IN
CLUDE ALL FEDERAL,STATE AND CITY TAXES APPLICABLE TO THE WORK.
SECTION II:That the District’s At~orpey is hereby directed
to prepare a contract for said Healy-Tihbitts Construction Company
with bond for faithful performance to accompany same,which bond
shall be in the sum of not less than $2,047,800 for faithful
performance of the contract and a second bond in the sum of not
less than $1,023,900 to guarantee payment of all claims for labor
—3-
and material furnished;that said contract shal].provide that t~75
work be completed within three hundred sixty (360)calendar days
from the date of the contract;said contract shall also provide
that progress pa~’rients will be made for work completed as of the
first day of each month in the manner in which other bills of the
District are paid.
SECTION III:That the contract be awarded on the basis of the
construction of the Ocean Out~f all Sewer to Station 70 ~00 as shown
Oil the plans and specifications therefor adopted by Resolution No.
of the Board of Directors of said District No.1 with a
provision in the Contract to automatically eliminate from said
Contract for Proposal No.1,First i~.1ternate,item floe,.5,6,9,
10,15,16,22 and 23,thereby reducing the length of the Ocean
Outfall Sewer (Marine Section)from a total length of 7000 feet
to a length of 6000 feet at the end of sixty (60)days from
the date of the Contract if said County Sanitation iiistricts Nos.
2,3,5,6,7 and 11 acting through said County Sanitation
District No.1 does r~pt reaffinii the provisions of the Cont~act
providing for the Ocean Outfall (Marine Seotion)be constructed
to a total length of 7000 feet.
SECTION IV:That the Chairr~an of the Board of Directors is
hereby directed to enter into said contrac~with Healy—Tibbitts
Construction Company in behalf of County Sanitation District No.1
of Orange County,California,acting for itself and as Contracting
~gent for said County Sanitation Districts Nos~.2,3,5,6,7 and
11 of Orange County,California.
S~CTI0N V:That all other bids for the construction of the
Ocean.Outfall Sewer (Marine Section)he and th~same are hereby
rejected and the Secretary of the Board is hereby directed to re—
turn cashier’s cheolzs,certified checks or bidder’s bonds to the
unsuccessful bidders,
SECTION VI:That payment for the i~ork to be done under the
provisions of the hereinabove authorized Contract chargeable to
said County Sanitation District No.1,be made from the Construc
tion ?und of said County Sanitation District No.1 in the manner
heretofore agreed by and between said County Sanitation Districts
1,2,3,5,6,‘7 and 11,
27C
The foregoing resolution w~s passed and adopted at a regular
adjourned meeting of the Boa~d of Directors of County Sanitation
District No.One on the 7th day of August,1952.
Sec~etary pro teth,Board of Dir~ctors
County Sanitation District No.1
Orange County,California
STATE OF CALIFORNIA)
ss
COUNTY OF ORANGE
I,RAYJVIONDR.RIBAL,Secretary pro teW of the Board of
Directors of County Sanitation District No.One of Orange County,
California,do hereby certify that the foregoing r~so1ution was
passed and adopted at a regular adjourned meeting of the Board
of Directors of County Sanitation District No.One of Orange
County,California,held on the 7th day of August,1952,by
the following roll call vote:
AYES:Directors J.L,McBride,Wi1li~H.Warner
and Courtney R..Chand1e~’.
NOES:None
ABSENT:None
IN WITNESS WHEREOF,I have hereunto set my hand and affixed
the seal of:Con.ty Sanitation District No.One of Orange County,
California,this 7th day of August,1952.
Secretary ~pro tern,Board of Directors
County Sanitation District No.1
Orange County,California
—5—