Loading...
HomeMy WebLinkAbout2007-09-19 ORANGE COUNTY SANITATION DISTRICT September 13, 2007 phone: (714)962-2411 NOTICE OF SPECIAL MEETING lot: (714)962J 56 eN"VOCed.carn ODOR CONTROL & AIR QUALITY — BOARD WORKSHOP NO. 3 msiling."dress: Pa Bon B127 Fountain Valle,M BOARD OF DIRECTORS 92728-8127 ORANGE COUNTY SANITATION DISTRICT KrHt addMU: 10844 alic Avenue Fountain Velley,CA 92708-7018 WEDNESDAY, September 19, 2007 — 5:00-8:00 P.M. Monher agenolee DISTRICT'S ADMINISTRATIVE OFFICES • cltl.. 10844 Ellis Avenue Fountain Valley, California 92708 Aran.. Brae atom Park Fnnntlon Cyprus. The Special Meeting of the Board of Directors of the Orange County Sanitation Fullerton District will be held at the above location, time and date. Gordon Brova Huntington Banco Irvine Le Habra n Le L. Palm y[// L Alamita Newport south arang.ga CI ft lk of the B pbrid Placentia Santa Ana Seel beech Brenton Tustin Villa Park Yorbe Linda County o/ Orange 8anitin" District. Cost. Mae. Midway City water olstocts Irving Ranch To maintain world-class leadership in westewater and water resource management. AGENDA BOARD OF DIRECTORS ORANGE COUNTY SANITATION DISTRICT DISTRICT'S ADMINISTRATIVE OFFICES 10844 ELLIS AVENUE FOUNTAIN VALLEY, CA 92708 SPECIAL MEETING RE: Strategic Plan Board Workshop No. 3 Wednesday, September 19, 2007 5-8:00 p.m., OCSD Board Room Workshop Facilitator: Brent Ives, BHI Management Consulting 5:00 p.m. 1. Pledge of Allegiance and Opening Remarks Jim Ferryman, Board Chair, and Jim Ruth, General Manager 5:05 p.m. 2. Overview Bob Ghirelli, Assistant General Manager 5:10 p.m. 3. Public Comments 5:20 p.m. 4. Air Quality Ed Torres, Director of Technical Services 5:50 p.m. 5. Open Discussion—Air Quality Brent Ives and Board of Directors 6:30 p.m. 6. Break 6:45 p.m. 7. Odor Control Ed Torres, Director of Technical Services 7:15 p.m. 8. Discussion — Odor Control Brent Ives and Board of Directors 7:55 p.m. 9. Wrap-up Bob Ghirelli, Assistant General Manager 8:00 p.m. 10. Adjournment 08/08/07 Page 2 Agenda Posting: In accordance with the requirements of California Government Code Section 54956,this agenda has been posted in the main lobby of the District's Administrative offices not less then 24 hours prior to the meeting date and time above. All written materials relating to each agenda item are available for public inspection in the office of the Clerk of the Board. Public Comments: Any member of the public may address the Board of Directors on specific agenda items. As determined by the Chair,speakers may be deferred until the specific item is taken for discussion and remarks may be limited to three minutes. If you wish to speak,please complete a Speaker's Form(located at the table outside of the Board Room)and give it to the Clerk of the Board. Meeting Adioumment: This meeting may be adjourned to a later time and items of business from this agenda may be considered at the later meeting by Order of Adjournment and Notice in accordance with Government Code Section 54955(posted within 24 hours). Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible. If you require any special disability related accommodations, please contact the Orange County Sanitation District Clerk of the Board's office at(714)593-7130 at least 72 hours prior to the scheduled meeting. Requests must specify the nature of the disability and the type of accommodation requested. .................................................................................................................................................................................................................................................................................................. ;NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the Board of Directors, :hems shall be submitted to the Clerk of the Board no later than the close of business 14 days preceding the :Board meeting. The Clerk of the Board shall include on the agenda all items submitted by Directors, the General Manager and General Counsel and all formal communications. 'General Manager James D. Ruth (714)593-7110 imth[g?ocsd.com ;Assistant General Manager Bob Ghirelli (714)593-7400 rahirellina ocsd.com i .Clerk of the Board Penny Kyle (714)593-7130 okvle(docsd.com .Director of Engineering Jim Herberg (714)593-7020 iherberafa)ocsd.wm ':Director of Fin. 8 Admin Services Lorenzo Tyner (714)593-7550 Itvner(docsd.win i Director of Operations 8 Nick Arhontes (714)593-7210 namonlesfdowd corn i Maintenance Director of Technical Services Ed Tortes (714)593-7080 etorresCcDocsd.com General Caunset Brad Hgn -lewco ......................, .............................. .......... ............-...........-.......... ..) K%deptlagenda\Boartl Agendas\2D07 Board Agendast091907 workshop agenda.doc Orange County Sanitation District \WWI Setting Level of Service for Air Quality September 19, 2007 Policy Issue: OCSD expects the South Coast Air Quality Management District (SCAQMD)to amend existing regulations to require significant reductions in common pollutants (smog, visibility impairment) in December 2007. A secondary public health benefit of this regulation is the reduction in air toxic emissions. The estimated capital improvement cost to meet the new requirements is $29 million. 1. If the new regulations are not approved then OCSD will be required by 2012, under the existing regulations,to notify all affected residents and business surrounding our facilities of health risks associated with our emissions. 2. OCSD can avoid issuing notifications by proactively installing air pollution control equipment to reduce the air toxic emissions below the notification level. 3. In addition, approximately$2 million will be required to install air pollution controls to lower the risk to employees below the notification level. The SCAQMD does not require notification for employees. Analysis: Currently, state law and the SCAQMD require facilities to inventory their air toxic emissions and conduct a Health Risk Assessment of the health risk impact of their emissions to surrounding residents and businesses. Public notification is required if the cancer risk exceeds ten in one million and non- cancer risk exceeds one. This means that ten out of one million residents exposed to OCSD air emissions, over a 70-year period, can contract cancer. It is anticipated that after completion of full secondary facilities in 2012, OCSD will exceed the threshold established by SCAQMD and OCSD will be required to notify affected communities. New regulations proposed by the SCAQMD would require OCSD to make significant reductions in common pollutants. The most technically feasible and lowest cost solution will be to add air pollution controls to the existing engines, which would provide the added benefit of reducing air toxic emissions below levels that require public notification. However, additional controls would still be necessary to reduce risk to OCSD employees below the level of public notification. `v� Alternatives: (lithe new regulations are not enacted) t. Notify the affected public of the potential health risk from OCSD's toxic air emissions. OCSD would notify the public via direct mailings to the residents, businesses, and schools followed by public meetings. The corresponding materials will also be listed on the SCAQMD web site and, possibly, printed in local newspapers. 2. Add air pollution controls to reduce risk to community below public notification level. - and - Option A Install additional air pollution controls to lower the risk to employees below the notification level. - or- Option B Do not install additional air pollution controls to lower the risk to employees below the notification levels. Note: if the SCAQMD rule amendments are approved, the Board will still need to decide whether to expend the $2 million to lower the heakh risks of the employees. Staff Recommendation: OCSD should apply feasible and cost-effective controls in order to reduce the air toxic emissions below the health risk notification level to the surrounding community and OCSD employees. exx� Answers� to questions about... Central Power Generation System • Background 1 The Orange County Sanitation District(OCSD)is a public agency that provides wastewater collection, treatment and disposal services for approximately 2.5 million people in central and northwest Orange County.We operate two facilities- Reclamation Plant No. 1 in Fountain Valley and Treatment Plant No. 2 in Huntington Beach-and treat an average of 240 million gallons of wastewater each day. The energy cost to run our treatment plants is a significant part of our annual operations and maintenance budget. As such,we continuously strive to improve the efficiency and cost-effectiveness of our operations, while ensuring compliance with strict environmental regulations as well as conservation of natural resources. Consistent with these efforts,we have for more than 30 years used digester gas, also called biogas, a natural by-product of the treatment process, as a fuel at our plants to save energy. The Central Power Generation System helps us achieve our productivity and energy conservation goals by using all of the biogas we create. It allows us the option to r;.:r operate independent from the electric company while increasing operational reliability. And, because we have been able to substantially reduce energy costs, we are able to save millions of dollars each year and pass those savings on to our ratepayers, e a How Does the Central Power Generation System Work? Eight state-of-the-art, clean burning, internal combustion engines drive generators that produce electricity to run our two treatment plants. The three engines at Plant No. 1 Orange County and the five engines at Plant No. 2 were designed to minimize the emissions from Sanitation District engine exhaust and are fueled by natural gas and digester gas. Currently the District is reevaluating the engines to meet more stringent air quality regulations. Vision- To maintain world-class Digester gas is produced during the treatment process by the anaerobic (not requiring leadership in wastewater oxygen) bacteria in the digesters. The bacteria convert about 50 percent of the solids and water resource to digester gas. This biogas is approximately 65 percent methane and 35 percent management carbon dioxide and is an excellent fuel. • What Are the Benefits of the Central Power Generation System? We are able to improve plant reliability, and save ratepayers money by producing our own electricity. In the 1990's, Central Power Generation replaced 23 old internal combustion engines with eight new, state-of-the-art engines. These new engines greatly reduce emissions of oxides of nitrogen and carbon monoxide because digester gas has a low heat value, approximately one-half that of natural gas, burns slower and thus produces less of these air emissions; however in the future these engines may require modifications to meet more stringent air quality requirements. Fount Ellis Avenue o How Does This Project Improve Reliability? Fountain Valley, CA I P tY 92708-7018 The Central Power Generation System, along with the Southern California Edison grid, are two sources of power. Our major plant processes require continuous, reliable, for more information uninterrupted operations. One engine at Plant No. 1 and two at Plant No.2 are on call (714) 962-2411 standby, providing even greater reliability. The water pumping system and critical unit or visit our web site processes have a third source of electricity from emergency generators. v .ocsd .-continued on otherside j_jOCSD/091aW/C.nemudr P.Y.r • How Much Did the Central Power Generation System Project Cost and How Will It Be Paid For? _s This project cost was approximately$75 million to plan, design and construct, ,« and was financed through borrowing. It is estimated that it will pay for itself in less than 20 years through deferred electrical casts. • How Does Central Power Generation System Help the Organic solids are processed Current Energy Crisis? in digesters.each with an average 9y holding capacity of 2 million gallons The District cannot reduce power to the plant without affecting the treatment quality. This has become even more difficult as the District approaches secondary treatment goals and begins to supply high quality effluent to the _ Ground Water Replenishment System project. Fortunately, the Central Generation facilities at each plant provide a significant amount of the power required for operations. Newer air quality limitations have restricted use of the generators but they are ramped up to the maximum allowed during the hot summer days, both to save on energy costs and to support the _ State's utility grid. At Plant 2, we are able to supply the entire plant load and eliminate any imports of power, significantly helping conserve power and making Headworks mom sewdye pumpsr more available for community needs year round. The District continues to design a critical water pumping system energy efficiency into all new and rehabilitation projects, which help to reduce the for Plant No. I impact to the statewide power limitations. • How Much Does It Cost to Operate the Central Power onGeneration System? For the fiscal year July 2006 through June 2007, the combined costs for the Central Power Generation Systems at both treatment plants were as follows: �` Fuel Costs $ 1,279,555 Operating and Maintenance Costs 3,676,213 Iota/Costs $4,955.768 Electricity is used to operate ocean outfall booster station Income from Sales of Excess Power $ 44,152 motors at Plant No.2 Net Costs $4,911,616 The treatment plants produced an average of 11 MW during the year, or enough to power about 11,000 homes. Because we only pay for the natural gas and not the digester gas, our cost to produce power is only 4.7 cents per kWh. FROWNWRAV Plant No. 1 Plant No.2 Operating Engine-Generator Sets 2 3 Standby Engine-Generator Sets 1 2 Each Engine Horsepower(at full load) 3,4 Engine Speed(rpm) 400 360 360 Central Power Generation System Number of Engine Cylinders leach) 12 16 engines at Plant No. I Engine Weight(pounds each) 214,000 260,000 Generator Output(in kilowatts each) 2,500 3.000 Generator Voltage(volts) 12,470 12,470 Average Power Output(megawatts) 4.1 7.1 4 Central Power Generation System engines at Plant No.2 0CSD/091007/C,r Gv..Wr pogo 2 Orange County Sanitation District Setting the Level of Service for Odor Control September 19, 2007 Policy Issue: Thousands of homes surround OCSD's two treatment plants. Under current operating procedures, OCSD's goal is to contain odor nuisances within our property boundary. Currently, OCSD bases the level of odor subjectively with complaints received. This is not an accurate accounting of actual odors since most businesses, residents, and commuters do not call to complain and a resident may call and complain about a persistent odor over several days or weeks and this is counted as one complaint. To gauge odor nuisances accurately, OCSD Is changing to a scientifically based level of odor detection to determine accurately the Level of Service (LOS) it wishes to achieve for communities surrounding our treatment plants. The Board must then choose the desired LOS. Analysis: In 2002, OCSD completed the Odor Control Master Plan, which provided speck recommendations and measures to control and reduce odors. Staff conducted an extensive evaluation of OCSD facilities by collecting and analyzing odor samples from the plant processing equipment. The District used a panel of 6-8 people, with average olfactory sensitivity, to determine the odor detection thresholds scientifically based on the number of times the sample needed to be diluted before the panelist detected odor. Staff then assigned an odor unit to the sample -the higher the number of dilutions needed to achieve the threshold, the stronger the odor. Staff then fed the data into a computer model to predict the impact to the community. With the modeling analyses completed, staff concluded that under normal operation conditions, by using a guideline of 10 D/T (dilutions to threshold) OCSD would eliminate odor to the surrounding community. OCSD currently meets a 40-50 D/r,which is 4 to 5 times greater than 10 D/r. After the currently approved CIP projects are constructed, OCSD is estimated to reach a level of 25-30 DR (2.5 to 3 times greater than 10 D/r). Alternatives: 1. Adopt a treatment plant LOS of 25-30 dilutions/threshold. LOS will be achieved when the projects approved in the current CIP are constructed. Design and construct all future projects to a service level that will keep odors from that project on District property. Staff believes this level is 10 Drr but rase-by-case modeling for the projects will be required. The result is no cost Impact to the current approved CIP. 2. Adopt a treatment plant and future project design and construction LOS for odor control of 10 dilutions/threshold (within the fence line of OCSD) and incorporate into the CIP beginning in FY 2008-2009 implemented over an 11 year period to reduce the impact on rates. The result is an increase of$69.6 million to the CIP and $648.000 for O&M. Staff Recommendation: Staff is proposing that all new processes, structures and equipment at the wastewater treatment plants be designed so that the effect of odors from these new facilities, when combined with existing facilities, are contained within the facility property line. Staff proposes that the Board of Directors approve Alternative 2 and phase odor reduction capital improvements over 11 years to minimize financial impacts to ratepayers. o,HEE EEXI r4j Answers to questions about... Odor Control Program Who is the Orange County Sanitation District? The Orange County Sanitation District (OCSD) is responsible for safely collecting,treating, and disposing of wastewater generated by more than 2.5 million people living and working in Orange County. OCSD operates the third largest wastewater system on the West Coast, consisting of over 580 miles of sewers and two regional wastewater treatment plants in Fountain Valley and Huntington Beach. �. What causes odor from a wastewater treatment plant? Wastewater creates odor nuisances from a variety of sources, such as odors escaping from sewer maintenance holes and wastewater treatment facilities. The major cause of odors is sulfide compounds. When oxygen is not present in the trunk sewers, hydrogen sulfide can form. Hydrogen sulfide, easily detected in low concentrations, is quickly recognizable by its characteristic _ rotten egg smell. Its creation in wastewater systems occurs primarily in the slime layer that accumulates on pipe walls,in the sludge blankets of clarifiers, and other solids processing - units. At high concentrations hydrogen sulfide can be damaging to pipes and wastewater treatment facilities. Controlling Odors Currently,we remove odors by focusing on the treatment of hydrogen sulfide, but with the identification of odorous sulfur-and nitrogen-based compounds later in our process,we are beginning to focus on a comprehensive odor measurement program that will allow us to more effectively treat all types of odors emanating from our plants. OCSD controls odor in the collections system and the two treatment plants through three i/ methods: gas flaps, chemical dosing, and air scrubbers. - Gas Flaps— Placed inside a pipe or other structure, a gas flap is a piece of rubber,which >- allows the sewer water to flow through the pipe, but restricts air movement that causes ;;C �,"�i c• odors to escape. Chemical Dosing— In an effort to reduce odors throughout our service area and extend the useful life of OCSD's trunk line assets, chemicals are added to key trunk lines. Currently,four Orange trunk lines receive continuous treatment and eight trunk lines receive intermittent treatment Sanitation County Districtusing caustic soda dosing. Seven dosing stations in central and northern Orange County provide a continuous chemical feed to control odors. Additionally, as the wastewater enters the plant, the District adds odor control chemicals to react with sulfides to assist with odor control. Six trunklines at Plant No. 1, five trunklines leadership in uxatmater at Plant No. 2, and various sites throughout the treatment plants also receive chemical andwwramme treatment to control odor. mawgewni Air Scrubbers—While chemical dosing reduces odors, it does not eliminate it.As a result, OCSD covers most of the plant processes so odors cannot escape into the surrounding community.The covered processes include the screening areas,the grit chambers, rag and grit collection bins, flow splitter boxes, primary settling basins, dissolved air flotation thickeners, dewatering facilities, and solids storage areas. The air captured from the covered structures is forced into two-story tall towers called air scrubbers. OCSD currently uses two types of air scrubbers: chemical and biological. A carbon scrubber will be added in the near future,giving us a third type at our facilities. Chemical air scrubbers use chemicals to strip hydrogen sulfide and other odorous gases 10844 Ellis Avenue from the air.The odorous compounds from the foul air is adsorbed into the scrubber liquid Fountain Valley, CA and the clean air is released though the top of the tower. 92708-7018 The biological scrubbers utilize a biological process, meaning there are no chemicals used for _ information to strip the gases from the air. The air scrubber media contains small foam cubes where microorganisms attach to the foam media and consume the undesirable gases. or visit our web site ...continued on other side OCSa/091709/0d.,N, Pagel rOCSD also operates biofilters, another type of biological air scrubbers that contain rock-type media. Biofilters require much less liquid solution than the scrubbers; however, a larger f space is necessary for the same level of treatment. Plant 1 operates 12 tower chemical scrubbers, 1 biological scrubber, and 1 biofilter for odor control. Plant 2 operates 12 tower chemical scrubbers, 4 biological scrubbers and 1 biofilter i, for odor control. Characterizing Odor Since all people perceive odor differently, a chemical Lob staff collecting analysis does not necessarily provide information on how odorous a certain process is. a nao-undmismanalne In order to better understand and eliminate odors from our processes. OCSD periodically collects samples for analysis by an eight-person odor panel.The panel member uses an olfactometer, a device that takes a small portion of the odorous sample and delivers it in different ratios through a nosepiece, to a panel member who sniffs it. Based on the results, OCSD can understand the strength of the odor. Odor Complaint Process OCSD takes odor complaints very seriously and has a crew available 24 hours a day to respond to complaints. When the control center receives a complaint regarding the odor, the clerk will ask the caller for information to help OCSD identify the odor source. If the odor is currently occurring, OCSD will investigate the odor by going to the reported area of the odors, check the wind direction, and potential sources Air strabbers of odor in the area. Once staff determines the source of the odor, they will make changes to address the source of the odor. Staff completes a report to document the complaint and any actions taken. If the problem is not immediately obvious, further investigation may be necessary, such as smoke testing and monitoring of odors in the area. More Information OCSD is working on several capital projects to add additional odor control systems or to replace existing ones, which will provide a better means of controlling odors. However, if you encounter smells, even if you are not certain the odor is coming from the sewers or one of the OCSD plants, please contact us immediately at the Odor Complaints Hotline (714) 593-7025. New air scrubbers currently being constructed at Plant No.2. Cleaned Air fI4'l Chemical Dosing Air Scrubber Treatment for Odors Odor Treatment u D Odors Paul Air) Most of our wastewater treatment processes are covered or contained In _ an building so foul air can be ceptored and pushed through air scrubbers Sewage Wastewater Trintroun Processes Entering OCSD Soweril Anon d1.Sallee of p OCSD's odor control program mainly consists of: (1)A chemical treatment to control escaping odors from manholes along our major sewer pipes in our service area: (2)chemically dosing the wastewater as it enters the plant;and(3)using air scrubbers to treat odors(foul air)captured from wastewater treatment processes. Gas flaps installed inside a manhole to help prevent odors from escaping =D/091207/0dar.edr page 2 Strategic Plan Board Workshop No. September 19, 2007 ACTIVE DIRECTORS NAME ENTrrY REPRESENTING SIGN IN Anderson, Steve City of La Habra Antos, Charles City of Seal Beach pp� Bankhead, Don City of Fullerton Choi, Steven City of Irvine Crandall, Larry City of Fountain Valley Dalton, Bill City of Garden Grove Davert, Doug City of Tustin _ 2 Dumitru, Jon City of Orange Ferryman,James Costa Mesa Sanitary District f Freschi, Richard A. City of Villa Park Green, Cathy City of Huntington Beach Luebben, Phil City of Cypress Marshall, Patsy City of Buena Park Miller, Darryl G. Irvine Ranch Water District _ Moore, Roy City of Brea Neugebauer,Joy L. Midway City Sanitary Chris Norby Board of Supervisors _ Parker, Ken City of Los Alamitos Shower, David City of Stanton I Sidhu, Harry City of Anaheim Tinajero, Sal City of Santa Ana Underhill,Constance City of Placentia Waldman, Mark City of La Palma Webb, Don City of Newport Beach Winder,Jim City of Yorba Linda H9tlepf%gmoU5a115l%BSIDIRECTOR\Directors Sign In Sheet.eoc Strategic Plan Board Workshop No. 3 September 19, 2007 ALTERNATE DIRECTORS NAME ENTITY REPRESENTING'" SIGN IN Aguirre, Joseph City of Placentia Anderson,John City of Yorba Linda Ayer, Guy City of Fountain Valley Beamish,Tom City of La Habra Bensvidez, David City of Santa Ana Ceder, David City of Stanton Cavecche, Carolyn City of Orange Daigle, Leslie City of Newport Beach Dow, Jim City of Buena Park Driscoll, Catherine City of Los Alamitos Garcia . Ron City of Brea Hansen, Don City of Huntington Beach Kang, Sukhee City of Irvine Kring, Lucille City of Anaheim Krippner,AI Midway City Sanitary District Narain,Prakash City of Cypress �. Nguyen, Janet Board of Supervisors Ooten, Robert Costa Mesa Sanitary District Palmer,Jim City of Tustin Quirk, Sharon City of Fullerton Reese, Brad City of Villa Park Reinhart, Douglas Irvine Ranch Water District Rodriguez, Ralph City of La Palma Rosen, Mark City of Garden Grove Shanks,Gordon City of Seal Beach H:Wepagmo\ISM151%BSIDIRECTOR\Directors Sign In Sheel.doc Strategic Plan Board Workshop Attendance ACTIVE DIRECTORS NAME ENTITY REPRESENTING 08/01/07 08/08/07 09/19/07 10/04/07 Anderson, Steve City of La Habra x __ Antos, Charles City of Seal Beach x X X Bankhead, Don City of Fullerton X X X Choi, Steven City of Irvine X X Crandall, Larry City of Fountain Valley X X X Dalton, Bill City of Garden Grove x __ X Davert, Doug City of Tustin x x X Dumitru,Jon City of Orange __ __ X Ferryman,James Costa Mesa Sanitary District X X X Freschi, Richard A. City of Villa Park X X X Green,Cathy City of Huntington Beach X X X Luebben, Phil City of Cypress X X X Marshall, Patsy City of Buena Park X X Miller, Darryl G. Irvine Ranch Water District x X Moore, Roy City of Brea X X X Neugebauer,Joy L. Midway City Sanitary X X X Chris Norby Board of Supervisors x x X Parker, Ken City of Los Alamitos x X X Shawver, David City of Stanton __ X X Sidhu, Harry City of Anaheim Tinajero, Sal City of Santa Ana x __ x Underhill,Constance City of Placentia X X X Waldman, Mark City of La Palma X X X Webb, Don City of Newport Beach __ __ x Winder,Jim City of Yorba Linda X X X H:\dept\gmo\150\1511SS\DIRECTOR\Directors 07 Wfshp Attendancex oc Strategic Plan Board Workshop Attendance ALTERNATE DIRECTORS NAME ENTITY REPRESENTING 08/01/07 08/08/07 09/19/07 10/04/07 Aguirre,Joseph City of Placentia __ __ -- Anderson,John City of Yorba Linda X X Ayer,Gus City of Fountain Valley X X X Beamish, Tom City of La Habra x x X Benavidez, David City of Santa Ana _ _ Carlene, David City of Stanton _ _ x Cavecche,Carolyn City of Orange _ _ _ Daigle, Leslie City of Newport Beach _ _ _ Dow,Jim City of Buena Park _ _ _ Driscoll, Catherine City of Los Alamitos X X X Garcia , Ron Ctty of Brea x X Hansen, Don City of Huntington Beach _ Kang, Sukhee City of Irvine _ Kring, Lucille City of Anaheim _ Krippner,AI Midway City Sanitary District x x X Narain, Prakash City of Cypress x x x Nguyen,Janet Board of Supervisors Dolan, Robert Costa Mesa Sanitary District X _ Palmer,Jim City of Tustin Quirk, Sharon City of Fullerton Reese, Brad City of Villa Park x x x Reinhart, Douglas Irvine Ranch Water District Rodriguez, Ralph City of La Palma — X X Rosen, Mark City of Garden Grove Shanks,Gordon City of Seal Beach Hidepr,gmo\1501151\B5\DIRECTOR\Directm 07 Wkshp Atleneanm,dm Strategic Plan Board Workshop No. 3 September 19, 2007 ACTIVE DIRECTORS NAME ENTITY REPRESENTING SIGN IN Anderson, Steve City of La Habra G� Antos, Charles City of Seal Beach n Bankhead, Don City of Fullerton Choi, Steven City of Irvine C GW Crandall, Larry City of Fountain Valley Dalton, Bill City of Garden Grove Davert, Doug City of Tustin Dumitru,Jon City of Orange Ferryman,James Costa Mesa Sanitary District Freschi, Richard A. City of Villa Park Green, Cathy City of Huntington Beach Luebben, Phil City of Cypress Marshall, Patsy City of Buena Park Miller, Darryl G. Irvine Ranch Water District Moore, Roy City of Brea BOtQ� Neugebauer,Joy L. Midway City Sanitary Chris Norby Board of Supervisors Parker, Ken City of Los Alamitos Shawver, David City of Stanton Sidhu, Harry City of Anaheim Tinalero,Sal City of Santa Ana Underhill, Constance City of Placentia Waldman, Mark City of La Palma /n, Webb, Don City of Newport Beach 9 T^ Winder,Jim City of Yorba Linda H:\depNmoV50\151\BS\DIRECTOR\DirKtomSignInShe t.doc Strategic Plan Board Workshop No. 3 September 19, 2007 ALTERNATE DIRECTORS NAME ENTITY REPRESENTING SIGN IN Aguirre, Joseph City of Placentia Anderson,John City of Yorba Linda Ayer,Guy)' City of Fountain Valley Beamish,Tom City of La Habra Benavidez, David City of Santa Ana Gaiters, David City of Stanton Cavecche,Carolyn City of Orange C./ Daigle, Leslie City of Newport Beach R/ Dow,Jim City of Buena Park Ddscoll, Catherine City of Los Alamitos Garcia, Ron City of Brea Hansen, Don City of Huntington Beach Kang, Sukhee City of Irvine Kring, Lucille City of Anaheim Gym Krippner, At Midway City Sanitary District ` Narain, Prakash City of Cypress Nguyen, Janet Board of Supervisors ai Dolan, Robert Costa Mesa Sanitary District Palmer,Jim City of Tustin 01� Quirk, Sharon City of Fullerton 0L Reese, Brad City of Villa Park Reinhart, Douglas Irvine Ranch Water District Q/ k Rodriguez, Ralph City of La Palma Rosen, Mark City of Garden Grove all Shanks, Gordon City of Seal Beach Kkkipt\gmo\l50V51\BS\DIRECTOR\Dine fors Sign In Sheetdx REQUEST TO ADDRESS THE BOARD OF DIRECTORS All persons wishing to address the Board on specific agenda items or matters of general interest should complete and submit this form to the Clerk of the Board prior to commencement of the Board meeting. As determined by the Chair, speakers may be deferred until the speck item is taken for discussion. Remarks may be limited to three minutes or less. Any handouts (60 COPIES REQUIRED) must be given to the Clerk of the Board prior to the meeting for distribution. DATE SPEAKER NO. -7 AGENDA ITEM NO. NAME: (please print) HOME ADDRESS: (Optional) (number/street) (cityf//zziip code) TELEPHONE: REPRESENTING: (self/name of organization) S/GN-/N SHEET ORANGE COUNTY SANITATION DISTRICT STRATEGIC PLAN BOARD WORKSHOP NO. 3 SPEAKER NAME ORGANIZATION/FIRM NO. Pleaseprint) lease int 1 2 3 ' 4 5 746 u� 6 7 Y46V 1/w-dv S 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 H.QEW GM01150F1511BS\FORMSI.SIGN-IN FORM.DOC ROLL CALL BOARD OF DIRECTORS ORANGE COUNTY SANITATION DISTRICT MEETING DATE & TIME: 08122/07 (BEAMISH) V .................ANDERSON...................— — — — — — (SHANKS) .....................V NTOS .........................— — — — — — (QUIRK) .........................4-BANKHEAD...................— — — — — — (KANG) * ...................... ...............*.....QHOI.......................... — — — — — — (AYER).. ................... .. ................... — — — — — — (ROSEN)......................../DALTON....................... —(PALMER)......................ADAVERT...................... — — — — — — (CAVECCff. )....................6uMITRU ................... — — — — — — (OOTEN)4. .....................(ERRYMAN...................— — — — — —(REESE) Z. ...................✓/I`RESCHI .............. ..... — — — — — —(HANSEN) .,............ REEN ...................... — — — — — — (NARAIN).V.......................CUEBBEN..................... — — — — (DOW).............................L�MARSHALL.................. — — — — .(REINHARTL....................✓MILLER .........................— — — — — — (GARCIA).V..................." ,:;I�clo R ....................... (KRIPPNER)Z✓.............. UGE AUER.............. — — — — — — (NGUYEN) .... ORBY .................... — — — — — —(DRISCOLL).:��::::::::::::::�.�ARKEI�:...................... — — — — — — (CADENA) ........................SHAWVER.................. — — — — — — (KRING).........................f-/SIDHU.......xt�....(i........ — — — — — — (BENAVIDES).........OR. ..TINAJERO. ..?n.......... — — — — — — (AGUIRRE) ... ANDERHILL ................. — — — — — —'ALDMAN....................(RODRIGUEZ (DAIGLE) ......................jMEBB .......................... (ANDERSON) ................ ./WINDER ...................... A�wu�z- STAFF: u Arhontes Colson Ghirelli Herberg Kovac Kyle Ruth Torres Tyner OTHERS: Ho in 08/22/07 H:\deptladmln\BS\DIRECTOR\Di..Wrs Roll Call.doc LevelBoard Workshop If 3: rvice Air and .do Distributed at i .. Board of Directors Level of Service TH Air Quality and Odor Board Workshop No. 3 Orange County Sanitation District September 19, 2007 Board Workshops ♦ Workshop 1 — Draft Strategic Plan Wednesday, August 1 (5-7p.m.) ♦ Workshop 2 — Biosolids and GWR System Wednesday, August 8(5-�:so p.m.) ♦ Workshop 3— Air Quality and Odor Wednesday, September 19(5-a p.m.) ♦ Workshop 4 — Revised Strategic Plan & Wrap-up Thursday, October4 Board Workshop#3: Level of Service Air Ouality d Odor Strategic Plan Schedule Strategic Butlget Planning Draft CIP Development Aug Sep..g O�c��N,� Oec Jan Feb 200] � 2n0a Approve Proposition Adopt Adapt Strategic 218 Notice Rates Budget Plan Key Performance Indicators 1. GWR System — future participation? 2. BioSolids — 100% recycling? 3. �ISInteCtlOD — Deferred to Operations Committee 4. Odor — new of measurement standard? 5. Air Quality — reduce emissions? Board Workshop#3: Level of Service Air Quality d Odor September , Air Quality Air Quality Level of Service Question Should OCSD invest in air pollution control equipment to maintain / reduce air toxics emissions? Board Workshop#3: Level of Service Air Quality and O September 19, .� OCSD Operates in the Worst Air Basin Mobile Sources Other Sources regulated by EPA and State regulated by AQMD I Common Pollution Air Toxics — Ambient Air Quality Standards — Risk•Based Standards — Health Effects � — Smog and Visibility Impairment (cancer,acute,chronic) O O Air Pollutants Board Workshop# 3: Level of Service Air Quality and Odor September 19, 2007 Source of Pollutants Power Generation 81% Source of • eP Mastewa Powerer "n, Generationter. 50% Process , 30% -44 a, Board Workshop# 3: Level of Service Air Quality and ... Modeling Cancer Risk Public Cancer Risk= possibility of getting cancer in the population of one million based on being affected by emissions for 70 years, 24 hours a day, 7 days a week Notification Level= 10 Action Level=25 Signgicant Level= 100 Employee Cancer Risk= possibility of getting cancer in the population of one million based on being affected by emissions for 40 years, 8 hours a day, 245 days a year Regulated under OSHA Risk in Perspective Medical X-Rays (one/year) 1 ,400 in Million �q Drinking a Diet Soda L r (one/day) ,„ 70 in Million . SOURCE'.Air Risk Inlonnation Support Center Board Workshop# 3: Level of Service Air Quality and OdoSeptember 19, r OCSD Air Toxics Risk Levels (Risk — number of individuals per million) Mw r•Brdalron on desel engines 30 Aetlon LMI No00atlon Loral 10 0 Vear 1999 2006 Modeled 2012 1999 Modeled 2012 Motleled Risk at Plant No. 1 Cancer Risk All Sources - 2012 i ' 1 I . - �� �ResitlanF.10 per million � Maximum Expasetl Intlivitlual _ Resitlen[(MEIR) Gadieltl Employee: 10 par million Board Workshop #3: Level of Service Air Quality . .. September 19, ¢I Modeletl Risk at Plant No. 2 Cancer Risk All Sources - 2012 {{jY�u � x ro°cJy L,•y.� �� 11";ryj(r� �'. art a�x1 • r zi � I� -� H ? ( m ♦� —tom' 'RAF +��Li�` ��16� _ ', rn����+ _!f �flesitlenC 10 per million Maximum Exposed Intlivitlual �Ja�,���..(�y � Resident lMEIR) ,vey^��. Employee:10 per million �Employee:25 per million Proposed SCAQMD Rule 1110.2 Requires a Significant Reduction of Common Pollution (smog) Air Toxics also reduced Common Pollutant Levels Board Workshop If 3: Level of Service Air Quality and Odor September •r Common Pollutants —' Air Toxics Gas Catalyst Raising Height of Stacks Air Toxics Air Toxics Gas Cleaner Gas Catalyst �l��l ���11�i��■ I�IIV�: III Air Toxics Fan Air Toxics=$17M LAir Tozlcs+ Rule 1 t t a2=$31 M Si]M $14M CIP costs only Alternative: Make Stacks Higher ♦ Plant 1 — raise stacks 10 feet Plant 2 — air emissions controls still required ♦ Does not reduce emissions, only dilutes ♦ CEQA review, permit required I ♦ SCAQMD Rule 1110.2 Adopted? ♦ Stack extension cost = $40Q,000 Board Workshop It 3: Level of Service Air Quality and OdoSeptember 19, r Air Quality Future Level of Service Management Cost Rule Delayed or Nat AOoptetl atteaaCve r: Cost of mailing notifications Ai No Action and public outreach (rere:Air rouas neaim�no0fiaatim) Rule Delayed or Nat Adopted Aaenialive 2' Put in place Air Toxies Controls CIP=S77M . . 08M=$1.5M per year Rule Adaptetl: Implement Rule Compliance CIP=$31M(s17M+Slant) (iridutles Air Tom Contrds) Q&M=$3.3M per year Projected Single Family Residential Annual Rate Increases zo% � Air Toxice Control. 5293.49 5330.76 15% 6.39-9256.65_1a.66% 1a.6]% 13.15% 13.56°h 5200.13 9.96% 16°6 Fq 5% _ Baseline SFR Rate Increase 0&09 a9-16 16-11 11-02 12-13 13-14 Fiscal Vear Board Workshop # 3: Level of Service Air Quality and .• September 19, �; Projected Single Family Residential Annual Rate Increases 20 � Rule Compliance 5298.01 533528 lindutles Air Touts Controls) tfi.a3% 16.06% 5258.3a 15% 5226.50—/a.23% 1320% 5200.25 10.01% 5351.57 5% Baseline SFR Rate Increase ae-Os olio ia-n n-t2 i2aa i3-ia Fiscal Year Air Qualify Recommended Level of Service Maintain / reduce health risk to below notification levels using the most cost-effective and technically feasible approach. QualityBoard Workshop #3: vel of Service Air " Odor Control Odor Control Level of Service Question What odor standard should the District measure and build 12 facilities to? Board Workshop #3: Level of Service Air Quality and OdoSeptember 19, r Existing Odor Control Program Cleaned Air 13 Chemical Dosing Treatment for Odors � � � qir Scrubber Odor Treatment �® __ Odors(Foul Air) / Sewage Treatment Processes Entering OCSD 7runklines in Service Area �r s. i � �c Board Workshop#3: Level of Service Air Quality and OdoSeptember 19, r Odor Control Program Based on Hydrogen Sulfide Odor Treatment Level Discharge from 0.5 ppm H2S Air Scrubbers Sewer Line Odors 1.0 ppm dissolved sulfide in Collection System What Changed? Re-Priortized CIP Projects Board Decision to retluce rate impacts Secontlary Treatment (new odor control budget) Standards 2000 2002 2006 2007 Odor Control Master Plan € (HzS to DR Standard) Implemented CIP Budget Evaluating LOS 14 with Odor DR Standard for odor control for new projects board Workshop Board Workshop#3: Level of Service Air Quality d Odor September0 Proposed LOS Based on Total Odor vs. Hydrogen Sulfide Levels at Fenceline Diluted . . . n n n Di I uted with 10 Volumes of Clean Air 15 E nnn N ' 1 E , OCSD Residents Treatment Plant & Businesses Total Odor Measurement: Dilutions per Threshold (D/T) Example of 10 DR: s 1 Volume Odorous Air 50% or more F ' ^ can detect ,� odor Board Workshop If 3: Level of Service Air Quality and Odor Odor Control Recommended Level of Service i . Establish odor standard based on total odor (D/T) z. Design all new projects to retain odor within property boundaries Our On-Going Commitment 16 to Reducing Odor Nuisance Board Workshop#3: Level of Service Air Quality and OdoSeptember 19, r Enhancements to Odor Control Wastehauler Controls Improvements to 91 17 Existing Facilities Researching New Technology for Primary Treatment Processes 1 , f - Board Workshop# 3: Level of Service Air Quality d OdoSeptember 19, r New Technology Being Implemented in Approved CIP ■uv16 -. .�„1 eIR `�R � k p,;l ; II11 i What Additional Odor Projects are Being Considered? Estimated CIP Costs ♦ P1 Primary Treatment so - go - of Oontrol ♦ P2 Permanent Odor Facility $12.1 M 18 at Biosolids Truck Loading $69.6 M Board Workshop If 3: Level of rvice Air Quality . a.. September 19, ,r What Additional Odor Projects are Being Considered? Estimated CIP Costs ♦ Pi Primary Treatment Scrubbers $11 M ♦ P2 Primary Treatment Scrubbers $41 M ♦ P1 Trickling Filter Odor Control ♦ P2 Permanent Odor Facility $12.1 M at Biosolids Truck Loading 19 $11 .6 M Proposed Odor Future Control Strategy Management Cost Baseline: Approved CIP(in baseline) Currently Approved CIP =$101.7M in Progress (completed in 2ot3) O&M=$5.9M (total$9.5M after 2013) attemaGve: Approved CIP(in baseline) Add four additional odor =$101.7M+additional CIP$69.6M control projects at both plants =$171.3M (stan 2013,completed over 8 years) O&M=$9.SM+eddttionel$648,1100 aecommarMaflon: Approved CIP(in baseline) ♦ Add two additional odor =$101.7M+additional CIP$17.6M control projects at both plants =$119.3M (start 2012,completed over 4 years) 08M=$9.SM+additional$300,000 ♦ Research primary treatment =$g,6M odor control alternatives Board Workshop#3: Level of Service Air Quality and OdoSeptember 19, r Projected Single Family Residential Annual Rate Increases 20% Attemaave: � Adding Four Odor Projects to Approved CIP(569.6M) 15% t315.03$RWA9 5209.61 5]9T]9 13.9% 10.99% 10a5% 1205% 520002 j 5139b3$1fi3.1] 519fi1] 9P'e 9.95% 9.99% 931% 10% 53fiB.W fi.3fi%3 556312 -ReVieed— 03b3953fifi.0] ].]1% >.364: Baseline fi.�z ].mz 5% OB-09 09-00 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-13 19-20 20-21 Fiscal Vear Projected Single Family Residential Annual Rate Increases 20% Recommendation: ■ Atltling Two Otlor Projects to Approved CIP(S77.fiM) (at P7 TF and P2 Truckloading) 15% E2Z2,StI$249.9T5280.05§925.36 t299% 10.95% 10.19% 19% 3200.02 � j 20 10% 9.9x —Revised— 5359.39 5371.50 fi.>tx 9.W% 5390.5] B83GIi11G fi.9]% 5% Y 0% OB-09 0940 10-11 11-12 12-13 13-14 14-15 15-16 Fiscal Vear Board Workshop#3: Level of Service Air Quality and Odor September 19, 00 Staff Recommendation Add two odor control projects to Approved CIP budget at additional cost of $17. 0 and additional O&M cost of $298,000 per year. ♦ Plant 1 Trickling Filter Odor Control ♦ Plant 2 Permanent Odor Facility at Biosolids Truck Loading Board Workshops ♦ Workshop 1 — Draft Strategic Plan Wednesday, August 1 (s-7p.m.) ♦ Workshop 2 — Biosolids and GWR System Wednesday, August B(s-�so p.m.) ♦ Workshop 3 — Air Quality and Odo21 Wednesday, September 19(s-a p.m.) ♦ Workshop 4 — Revised Strategic Plan & Wrap-up Thursday, October4 (�7p.m.) Board Workshop#3: Level of Service Air Quality and OdoSeptember 19, r Percent SFR Rate Increases with Recommended LOS 20% P°a � Air Oualiry �?'- � Biosolids 13.1%_ 14.5% � Odor Control O.B% fA3% 10% —Hevisetl— z% 5% B85ellrle 0°6 06-09 09-10 10-11 11-12 12-13 13-1/ 14-15 15-16 Fiscal Vear SFR Rate Increases Dollars with Recommended LOS per Vear 5500 $375 $385 5400 S33$ #0E15.58 E8.31 E292 $13.]2 5300 $255 54.47 _ $228 50.44 szB1 s1.e� s1.3o szoo a 1 5to0 yt 06-09 09AO ID-11 11-12 12-13 13-14 14-15 1546 Fiscal Year Board Workshop#3: Level of Service Air Quality d Odor September 19, rr Comparison of SFR Rates Dollars (Rates for Fiscal Year 2007-OB) peg vear S bJC irBD SJ00 5900 A°era a SPR =5282 5200 1 91De 5100 C ? 5 Q LL N W 7 f� 50 Comparison Agencies SFR Rate Increases Dollars with Recommended LOS per Vear 5600 $500 Average SFR with 5%IrAlalion $442 $400 $420 $367 S37$ 5383 53� ' 5300 5338 5282 szoo sloe 0]-0B De-09 09-10 10-11 11-1P 1P-13 13-14 10-15 16-16 16-0] 1]-iB 1e49 19d0 Fiscal Year Comparison Study Annual Single Family Residential (SFR) User Rates Agency Fiscal Year 2007-08 Los Angeles County $ 108.00 Irvine Ranch Water District $ 163.80 Oro Loma Sanitary District $ 193.00 City of Fresno $ 212.04 Sacramento County $ 222.00 East Bay MUD (for FY 06-07) $ 237.96 Union Sanitary District $ 243.36 Central Contra Costa Sanitary District $ 300.00 Dublin San Ramon Services District $ 321.00 City of Los Angeles $ 344.88 Vallejo Sanitation/Flood Control District $ 417.00 San Francisco $ 441.00 City of San Diego $ 459.84 Average $ 281.84 Orange County Sanitation District $ 182.00 Revision 9117/07 STATE OF CALIFORNIA) ) SS. COUNTY OF ORANGE ) Pursuant to California Government Code Section 54954.2, 1 hereby certify that the Notice and Agenda for the Special Board Meeting of Orange County Sanitation District, to be held on September 19, 2007, was duly posted for public inspection in the main lobby of the Districts' offices on September 13, 2007. IN WITNESS WHEREOF, I have hereunto set my hand this 13th day of September, 2007. Penny M. 1 le, Clerk of the Board Orange County Sanitation District