HomeMy WebLinkAbout2007-09-19 ORANGE COUNTY SANITATION DISTRICT
September 13, 2007
phone:
(714)962-2411 NOTICE OF SPECIAL MEETING
lot:
(714)962J 56
eN"VOCed.carn ODOR CONTROL & AIR QUALITY — BOARD WORKSHOP NO. 3
msiling."dress:
Pa Bon B127
Fountain Valle,M BOARD OF DIRECTORS
92728-8127 ORANGE COUNTY SANITATION DISTRICT
KrHt addMU:
10844 alic Avenue
Fountain Velley,CA
92708-7018
WEDNESDAY, September 19, 2007 — 5:00-8:00 P.M.
Monher
agenolee DISTRICT'S ADMINISTRATIVE OFFICES
•
cltl.. 10844 Ellis Avenue
Fountain Valley, California 92708
Aran..
Brae
atom Park
Fnnntlon Cyprus. The Special Meeting of the Board of Directors of the Orange County Sanitation
Fullerton District will be held at the above location, time and date.
Gordon Brova
Huntington Banco
Irvine
Le Habra n
Le L. Palm y[//
L Alamita
Newport south
arang.ga CI ft lk of the B pbrid
Placentia
Santa Ana
Seel beech
Brenton
Tustin
Villa Park
Yorbe Linda
County o/ Orange
8anitin" District.
Cost. Mae.
Midway City
water olstocts
Irving Ranch
To maintain world-class leadership in westewater and water resource management.
AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
SPECIAL MEETING RE:
Strategic Plan
Board Workshop No. 3
Wednesday, September 19, 2007
5-8:00 p.m., OCSD Board Room
Workshop Facilitator:
Brent Ives, BHI Management Consulting
5:00 p.m. 1. Pledge of Allegiance and Opening Remarks
Jim Ferryman, Board Chair, and Jim Ruth, General Manager
5:05 p.m. 2. Overview
Bob Ghirelli, Assistant General Manager
5:10 p.m. 3. Public Comments
5:20 p.m. 4. Air Quality
Ed Torres, Director of Technical Services
5:50 p.m. 5. Open Discussion—Air Quality
Brent Ives and Board of Directors
6:30 p.m. 6. Break
6:45 p.m. 7. Odor Control
Ed Torres, Director of Technical Services
7:15 p.m. 8. Discussion — Odor Control
Brent Ives and Board of Directors
7:55 p.m. 9. Wrap-up
Bob Ghirelli, Assistant General Manager
8:00 p.m. 10. Adjournment
08/08/07
Page 2
Agenda Posting: In accordance with the requirements of California Government Code Section 54956,this agenda
has been posted in the main lobby of the District's Administrative offices not less then 24 hours prior to the meeting
date and time above. All written materials relating to each agenda item are available for public inspection in the
office of the Clerk of the Board.
Public Comments: Any member of the public may address the Board of Directors on specific agenda items. As
determined by the Chair,speakers may be deferred until the specific item is taken for discussion and remarks may
be limited to three minutes.
If you wish to speak,please complete a Speaker's Form(located at the table outside of the Board Room)and give it
to the Clerk of the Board.
Meeting Adioumment: This meeting may be adjourned to a later time and items of business from this agenda may
be considered at the later meeting by Order of Adjournment and Notice in accordance with Government Code
Section 54955(posted within 24 hours).
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible. If you require
any special disability related accommodations, please contact the Orange County Sanitation District Clerk of the
Board's office at(714)593-7130 at least 72 hours prior to the scheduled meeting. Requests must specify the nature
of the disability and the type of accommodation requested.
..................................................................................................................................................................................................................................................................................................
;NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the Board of Directors,
:hems shall be submitted to the Clerk of the Board no later than the close of business 14 days preceding the
:Board meeting. The Clerk of the Board shall include on the agenda all items submitted by Directors, the
General Manager and General Counsel and all formal communications.
'General Manager James D. Ruth (714)593-7110 imth[g?ocsd.com
;Assistant General Manager Bob Ghirelli (714)593-7400 rahirellina ocsd.com i
.Clerk of the Board Penny Kyle (714)593-7130 okvle(docsd.com
.Director of Engineering Jim Herberg (714)593-7020 iherberafa)ocsd.wm
':Director of Fin. 8 Admin Services Lorenzo Tyner (714)593-7550 Itvner(docsd.win
i Director of Operations 8 Nick Arhontes (714)593-7210 namonlesfdowd corn
i Maintenance
Director of Technical Services Ed Tortes (714)593-7080 etorresCcDocsd.com
General Caunset Brad Hgn -lewco ......................, .............................. .......... ............-...........-..........
..)
K%deptlagenda\Boartl Agendas\2D07 Board Agendast091907 workshop agenda.doc
Orange County Sanitation District
\WWI Setting Level of Service for Air Quality
September 19, 2007
Policy Issue:
OCSD expects the South Coast Air Quality Management District (SCAQMD)to amend
existing regulations to require significant reductions in common pollutants (smog,
visibility impairment) in December 2007. A secondary public health benefit of this
regulation is the reduction in air toxic emissions. The estimated capital improvement
cost to meet the new requirements is $29 million.
1. If the new regulations are not approved then OCSD will be required by 2012,
under the existing regulations,to notify all affected residents and business
surrounding our facilities of health risks associated with our emissions.
2. OCSD can avoid issuing notifications by proactively installing air pollution
control equipment to reduce the air toxic emissions below the notification
level.
3. In addition, approximately$2 million will be required to install air pollution
controls to lower the risk to employees below the notification level. The
SCAQMD does not require notification for employees.
Analysis:
Currently, state law and the SCAQMD require facilities to inventory their air toxic
emissions and conduct a Health Risk Assessment of the health risk impact of their
emissions to surrounding residents and businesses.
Public notification is required if the cancer risk exceeds ten in one million and non-
cancer risk exceeds one. This means that ten out of one million residents exposed to
OCSD air emissions, over a 70-year period, can contract cancer. It is anticipated that
after completion of full secondary facilities in 2012, OCSD will exceed the threshold
established by SCAQMD and OCSD will be required to notify affected communities.
New regulations proposed by the SCAQMD would require OCSD to make significant
reductions in common pollutants. The most technically feasible and lowest cost solution
will be to add air pollution controls to the existing engines, which would provide the
added benefit of reducing air toxic emissions below levels that require public
notification. However, additional controls would still be necessary to reduce risk to
OCSD employees below the level of public notification.
`v�
Alternatives:
(lithe new regulations are not enacted)
t. Notify the affected public of the potential health risk from OCSD's toxic air
emissions. OCSD would notify the public via direct mailings to the residents,
businesses, and schools followed by public meetings. The corresponding
materials will also be listed on the SCAQMD web site and, possibly, printed in
local newspapers.
2. Add air pollution controls to reduce risk to community below public notification
level.
- and -
Option A
Install additional air pollution controls to lower the risk to employees below
the notification level.
- or-
Option B
Do not install additional air pollution controls to lower the risk to
employees below the notification levels.
Note: if the SCAQMD rule amendments are approved, the Board will still need to
decide whether to expend the $2 million to lower the heakh risks of the employees.
Staff Recommendation: OCSD should apply feasible and cost-effective controls in
order to reduce the air toxic emissions below the health risk notification level to the
surrounding community and OCSD employees.
exx�
Answers� to questions about...
Central Power
Generation System
• Background
1 The Orange County Sanitation District(OCSD)is a public agency that provides
wastewater collection, treatment and disposal services for approximately 2.5 million
people in central and northwest Orange County.We operate two facilities-
Reclamation Plant No. 1 in Fountain Valley and Treatment Plant No. 2 in Huntington
Beach-and treat an average of 240 million gallons of wastewater each day.
The energy cost to run our treatment plants is a significant part of our annual
operations and maintenance budget. As such,we continuously strive to improve the
efficiency and cost-effectiveness of our operations, while ensuring compliance with
strict environmental regulations as well as conservation of natural resources.
Consistent with these efforts,we have for more than 30 years used digester gas,
also called biogas, a natural by-product of the treatment process, as a fuel at our
plants to save energy.
The Central Power Generation System helps us achieve our productivity and energy
conservation goals by using all of the biogas we create. It allows us the option to
r;.:r operate independent from the electric company while increasing operational reliability.
And, because we have been able to substantially reduce energy costs, we are able to
save millions of dollars each year and pass those savings on to our ratepayers,
e
a How Does the Central Power Generation System Work?
Eight state-of-the-art, clean burning, internal combustion engines drive generators that
produce electricity to run our two treatment plants. The three engines at Plant No. 1
Orange County and the five engines at Plant No. 2 were designed to minimize the emissions from
Sanitation District engine exhaust and are fueled by natural gas and digester gas. Currently the District is
reevaluating the engines to meet more stringent air quality regulations.
Vision-
To maintain world-class Digester gas is produced during the treatment process by the anaerobic (not requiring
leadership in wastewater oxygen) bacteria in the digesters. The bacteria convert about 50 percent of the solids
and water resource to digester gas. This biogas is approximately 65 percent methane and 35 percent
management carbon dioxide and is an excellent fuel.
• What Are the Benefits of the Central Power Generation System?
We are able to improve plant reliability, and save ratepayers money by producing our
own electricity. In the 1990's, Central Power Generation replaced 23 old internal
combustion engines with eight new, state-of-the-art engines. These new engines
greatly reduce emissions of oxides of nitrogen and carbon monoxide because
digester gas has a low heat value, approximately one-half that of natural gas, burns
slower and thus produces less of these air emissions; however in the future these
engines may require modifications to meet more stringent air quality requirements.
Fount Ellis Avenue o How Does This Project Improve Reliability?
Fountain Valley, CA I P tY
92708-7018 The Central Power Generation System, along with the Southern California Edison grid,
are two sources of power. Our major plant processes require continuous, reliable,
for more information uninterrupted operations. One engine at Plant No. 1 and two at Plant No.2 are on
call (714) 962-2411 standby, providing even greater reliability. The water pumping system and critical unit
or visit our web site processes have a third source of electricity from emergency generators.
v .ocsd .-continued on otherside
j_jOCSD/091aW/C.nemudr P.Y.r
• How Much Did the Central Power Generation System Project
Cost and How Will It Be Paid For?
_s This project cost was approximately$75 million to plan, design and construct,
,« and was financed through borrowing. It is estimated that it will pay for itself in
less than 20 years through deferred electrical casts.
• How Does Central Power Generation System Help the
Organic solids are processed Current Energy Crisis?
in digesters.each with an average 9y
holding capacity of 2 million gallons The District cannot reduce power to the plant without affecting the treatment
quality. This has become even more difficult as the District approaches
secondary treatment goals and begins to supply high quality effluent to the
_ Ground Water Replenishment System project.
Fortunately, the Central Generation facilities at each plant provide a significant
amount of the power required for operations. Newer air quality limitations have
restricted use of the generators but they are ramped up to the maximum allowed
during the hot summer days, both to save on energy costs and to support the
_ State's utility grid. At Plant 2, we are able to supply the entire plant load and
eliminate any imports of power, significantly helping conserve power and making
Headworks mom sewdye pumpsr more available for community needs year round. The District continues to design
a critical water pumping system energy efficiency into all new and rehabilitation projects, which help to reduce the
for Plant No. I impact to the statewide power limitations.
• How Much Does It Cost to Operate the Central Power
onGeneration System?
For the fiscal year July 2006 through June 2007, the combined costs for the
Central Power Generation Systems at both treatment plants were as follows:
�` Fuel Costs $ 1,279,555
Operating and Maintenance Costs 3,676,213
Iota/Costs $4,955.768
Electricity is used to operate
ocean outfall booster station Income from Sales of Excess Power $ 44,152
motors at Plant No.2 Net Costs $4,911,616
The treatment plants produced an average of 11 MW during the year, or enough
to power about 11,000 homes. Because we only pay for the natural gas and not
the digester gas, our cost to produce power is only 4.7 cents per kWh.
FROWNWRAV
Plant No. 1 Plant No.2
Operating Engine-Generator Sets 2 3
Standby Engine-Generator Sets 1 2
Each Engine Horsepower(at full load) 3,4
Engine Speed(rpm) 400 360 360
Central Power Generation System Number of Engine Cylinders leach) 12 16
engines at Plant No. I Engine Weight(pounds each) 214,000 260,000
Generator Output(in kilowatts each) 2,500 3.000
Generator Voltage(volts) 12,470 12,470
Average Power Output(megawatts) 4.1 7.1
4
Central Power Generation System
engines at Plant No.2
0CSD/091007/C,r Gv..Wr pogo 2
Orange County Sanitation District
Setting the Level of Service for Odor Control
September 19, 2007
Policy Issue:
Thousands of homes surround OCSD's two treatment plants. Under current operating procedures,
OCSD's goal is to contain odor nuisances within our property boundary. Currently, OCSD bases the
level of odor subjectively with complaints received. This is not an accurate accounting of actual
odors since most businesses, residents, and commuters do not call to complain and a resident may
call and complain about a persistent odor over several days or weeks and this is counted as one
complaint. To gauge odor nuisances accurately, OCSD Is changing to a scientifically based level of
odor detection to determine accurately the Level of Service (LOS) it wishes to achieve for
communities surrounding our treatment plants. The Board must then choose the desired LOS.
Analysis:
In 2002, OCSD completed the Odor Control Master Plan, which provided speck recommendations
and measures to control and reduce odors. Staff conducted an extensive evaluation of OCSD
facilities by collecting and analyzing odor samples from the plant processing equipment. The District
used a panel of 6-8 people, with average olfactory sensitivity, to determine the odor detection
thresholds scientifically based on the number of times the sample needed to be diluted before the
panelist detected odor. Staff then assigned an odor unit to the sample -the higher the number of
dilutions needed to achieve the threshold, the stronger the odor. Staff then fed the data into a
computer model to predict the impact to the community.
With the modeling analyses completed, staff concluded that under normal operation conditions, by
using a guideline of 10 D/T (dilutions to threshold) OCSD would eliminate odor to the surrounding
community. OCSD currently meets a 40-50 D/r,which is 4 to 5 times greater than 10 D/r. After the
currently approved CIP projects are constructed, OCSD is estimated to reach a level of 25-30 DR
(2.5 to 3 times greater than 10 D/r).
Alternatives:
1. Adopt a treatment plant LOS of 25-30 dilutions/threshold. LOS will be achieved when the
projects approved in the current CIP are constructed. Design and construct all future
projects to a service level that will keep odors from that project on District property. Staff
believes this level is 10 Drr but rase-by-case modeling for the projects will be required. The
result is no cost Impact to the current approved CIP.
2. Adopt a treatment plant and future project design and construction LOS for odor control of 10
dilutions/threshold (within the fence line of OCSD) and incorporate into the CIP beginning in
FY 2008-2009 implemented over an 11 year period to reduce the impact on rates. The result
is an increase of$69.6 million to the CIP and $648.000 for O&M.
Staff Recommendation: Staff is proposing that all new processes, structures and equipment at the
wastewater treatment plants be designed so that the effect of odors from these new facilities, when
combined with existing facilities, are contained within the facility property line. Staff proposes that
the Board of Directors approve Alternative 2 and phase odor reduction capital improvements
over 11 years to minimize financial impacts to ratepayers.
o,HEE EEXI r4j
Answers
to questions about...
Odor Control Program
Who is the Orange County Sanitation District? The Orange County Sanitation District
(OCSD) is responsible for safely collecting,treating, and disposing of wastewater generated
by more than 2.5 million people living and working in Orange County. OCSD operates the third
largest wastewater system on the West Coast, consisting of over 580 miles of sewers and
two regional wastewater treatment plants in Fountain Valley and Huntington Beach.
�. What causes odor from a wastewater treatment plant? Wastewater creates odor
nuisances from a variety of sources, such as odors escaping from sewer maintenance holes
and wastewater treatment facilities. The major cause of odors is sulfide compounds.
When oxygen is not present in the trunk sewers, hydrogen sulfide can form. Hydrogen
sulfide, easily detected in low concentrations, is quickly recognizable by its characteristic
_ rotten egg smell. Its creation in wastewater systems occurs primarily in the slime layer that
accumulates on pipe walls,in the sludge blankets of clarifiers, and other solids processing
- units. At high concentrations hydrogen sulfide can be damaging to pipes and wastewater
treatment facilities.
Controlling Odors Currently,we remove odors by focusing on the treatment of hydrogen
sulfide, but with the identification of odorous sulfur-and nitrogen-based compounds later
in our process,we are beginning to focus on a comprehensive odor measurement program
that will allow us to more effectively treat all types of odors emanating from our plants.
OCSD controls odor in the collections system and the two treatment plants through three
i/ methods: gas flaps, chemical dosing, and air scrubbers.
- Gas Flaps— Placed inside a pipe or other structure, a gas flap is a piece of rubber,which
>- allows the sewer water to flow through the pipe, but restricts air movement that causes
;;C �,"�i c• odors to escape.
Chemical Dosing— In an effort to reduce odors throughout our service area and extend the
useful life of OCSD's trunk line assets, chemicals are added to key trunk lines. Currently,four
Orange trunk lines receive continuous treatment and eight trunk lines receive intermittent treatment
Sanitation County Districtusing caustic soda dosing. Seven dosing stations in central and northern Orange County
provide a continuous chemical feed to control odors.
Additionally, as the wastewater enters the plant, the District adds odor control chemicals
to react with sulfides to assist with odor control. Six trunklines at Plant No. 1, five trunklines
leadership in uxatmater at Plant No. 2, and various sites throughout the treatment plants also receive chemical
andwwramme treatment to control odor.
mawgewni Air Scrubbers—While chemical dosing reduces odors, it does not eliminate it.As a result,
OCSD covers most of the plant processes so odors cannot escape into the surrounding
community.The covered processes include the screening areas,the grit chambers, rag
and grit collection bins, flow splitter boxes, primary settling basins, dissolved air flotation
thickeners, dewatering facilities, and solids storage areas.
The air captured from the covered structures is forced into two-story tall towers called
air scrubbers. OCSD currently uses two types of air scrubbers: chemical and biological.
A carbon scrubber will be added in the near future,giving us a third type at our facilities.
Chemical air scrubbers use chemicals to strip hydrogen sulfide and other odorous gases
10844 Ellis Avenue from the air.The odorous compounds from the foul air is adsorbed into the scrubber liquid
Fountain Valley, CA and the clean air is released though the top of the tower.
92708-7018
The biological scrubbers utilize a biological process, meaning there are no chemicals used
for _ information to strip the gases from the air. The air scrubber media contains small foam cubes where
microorganisms attach to the foam media and consume the undesirable gases.
or visit our web site
...continued on other side
OCSa/091709/0d.,N, Pagel
rOCSD also operates biofilters, another type of biological air scrubbers that contain rock-type
media. Biofilters require much less liquid solution than the scrubbers; however, a larger
f space is necessary for the same level of treatment.
Plant 1 operates 12 tower chemical scrubbers, 1 biological scrubber, and 1 biofilter for odor
control. Plant 2 operates 12 tower chemical scrubbers, 4 biological scrubbers and 1 biofilter
i, for odor control.
Characterizing Odor Since all people perceive odor differently, a chemical
Lob staff collecting analysis does not necessarily provide information on how odorous a certain process is.
a nao-undmismanalne In order to better understand and eliminate odors from our processes. OCSD periodically
collects samples for analysis by an eight-person odor panel.The panel member uses an
olfactometer, a device that takes a small portion of the odorous sample and delivers it
in different ratios through a nosepiece, to a panel member who sniffs it. Based on the
results, OCSD can understand the strength of the odor.
Odor Complaint Process OCSD takes odor complaints very seriously and has a crew
available 24 hours a day to respond to complaints. When the control center receives a
complaint regarding the odor, the clerk will ask the caller for information to help OCSD
identify the odor source. If the odor is currently occurring, OCSD will investigate the odor
by going to the reported area of the odors, check the wind direction, and potential sources
Air strabbers of odor in the area. Once staff determines the source of the odor, they will make changes
to address the source of the odor. Staff completes a report to document the complaint
and any actions taken. If the problem is not immediately obvious, further investigation
may be necessary, such as smoke testing and monitoring of odors in the area.
More Information OCSD is working on several capital projects to add additional odor
control systems or to replace existing ones, which will provide a better means of controlling
odors. However, if you encounter smells, even if you are not certain the odor is coming
from the sewers or one of the OCSD plants, please contact us immediately at the
Odor Complaints Hotline (714) 593-7025.
New air scrubbers currently
being constructed at Plant No.2. Cleaned Air
fI4'l
Chemical Dosing Air Scrubber
Treatment for Odors Odor Treatment
u
D Odors Paul Air)
Most of our wastewater treatment
processes are covered or contained In _
an building so foul air can be ceptored and pushed through air scrubbers
Sewage Wastewater Trintroun Processes
Entering OCSD
Soweril Anon
d1.Sallee of p
OCSD's odor control program mainly consists of: (1)A chemical treatment to control escaping odors
from manholes along our major sewer pipes in our service area: (2)chemically dosing the wastewater
as it enters the plant;and(3)using air scrubbers to treat odors(foul air)captured from wastewater
treatment processes.
Gas flaps installed inside a manhole
to help prevent odors from escaping
=D/091207/0dar.edr page 2
Strategic Plan Board Workshop No.
September 19, 2007
ACTIVE DIRECTORS
NAME ENTrrY REPRESENTING SIGN IN
Anderson, Steve City of La Habra
Antos, Charles City of Seal Beach pp�
Bankhead, Don City of Fullerton
Choi, Steven City of Irvine
Crandall, Larry City of Fountain Valley
Dalton, Bill City of Garden Grove
Davert, Doug City of Tustin _
2
Dumitru, Jon City of Orange
Ferryman,James Costa Mesa Sanitary District
f
Freschi, Richard A. City of Villa Park
Green, Cathy City of Huntington Beach
Luebben, Phil City of Cypress
Marshall, Patsy City of Buena Park
Miller, Darryl G. Irvine Ranch Water District _
Moore, Roy City of Brea
Neugebauer,Joy L. Midway City Sanitary
Chris Norby Board of Supervisors _
Parker, Ken City of Los Alamitos
Shower, David City of Stanton I
Sidhu, Harry City of Anaheim
Tinajero, Sal City of Santa Ana
Underhill,Constance City of Placentia
Waldman, Mark City of La Palma
Webb, Don City of Newport Beach
Winder,Jim City of Yorba Linda
H9tlepf%gmoU5a115l%BSIDIRECTOR\Directors Sign In Sheet.eoc
Strategic Plan Board Workshop No. 3
September 19, 2007
ALTERNATE DIRECTORS
NAME ENTITY REPRESENTING'" SIGN IN
Aguirre, Joseph City of Placentia
Anderson,John City of Yorba Linda
Ayer, Guy City of Fountain Valley
Beamish,Tom City of La Habra
Bensvidez, David City of Santa Ana
Ceder, David City of Stanton
Cavecche, Carolyn City of Orange
Daigle, Leslie City of Newport Beach
Dow, Jim City of Buena Park
Driscoll, Catherine City of Los Alamitos
Garcia . Ron City of Brea
Hansen, Don City of Huntington Beach
Kang, Sukhee City of Irvine
Kring, Lucille City of Anaheim
Krippner,AI Midway City Sanitary District
Narain,Prakash City of Cypress �.
Nguyen, Janet Board of Supervisors
Ooten, Robert Costa Mesa Sanitary District
Palmer,Jim City of Tustin
Quirk, Sharon City of Fullerton
Reese, Brad City of Villa Park
Reinhart, Douglas Irvine Ranch Water District
Rodriguez, Ralph City of La Palma
Rosen, Mark City of Garden Grove
Shanks,Gordon City of Seal Beach
H:Wepagmo\ISM151%BSIDIRECTOR\Directors Sign In Sheel.doc
Strategic Plan Board Workshop Attendance
ACTIVE DIRECTORS
NAME ENTITY REPRESENTING 08/01/07 08/08/07 09/19/07 10/04/07
Anderson, Steve City of La Habra x __
Antos, Charles City of Seal Beach x X X
Bankhead, Don City of Fullerton X X X
Choi, Steven City of Irvine X X
Crandall, Larry City of Fountain Valley X X X
Dalton, Bill City of Garden Grove x __ X
Davert, Doug City of Tustin x x X
Dumitru,Jon City of Orange __ __ X
Ferryman,James Costa Mesa Sanitary District X X X
Freschi, Richard A. City of Villa Park X X X
Green,Cathy City of Huntington Beach X X X
Luebben, Phil City of Cypress X X X
Marshall, Patsy City of Buena Park X X
Miller, Darryl G. Irvine Ranch Water District x X
Moore, Roy City of Brea X X X
Neugebauer,Joy L. Midway City Sanitary X X X
Chris Norby Board of Supervisors x x X
Parker, Ken City of Los Alamitos x X X
Shawver, David City of Stanton __ X X
Sidhu, Harry City of Anaheim
Tinajero, Sal City of Santa Ana x __ x
Underhill,Constance City of Placentia X X X
Waldman, Mark City of La Palma X X X
Webb, Don City of Newport Beach __ __ x
Winder,Jim City of Yorba Linda X X X
H:\dept\gmo\150\1511SS\DIRECTOR\Directors 07 Wfshp Attendancex oc
Strategic Plan Board Workshop Attendance
ALTERNATE DIRECTORS
NAME ENTITY REPRESENTING 08/01/07 08/08/07 09/19/07 10/04/07
Aguirre,Joseph City of Placentia __ __ --
Anderson,John City of Yorba Linda X X
Ayer,Gus City of Fountain Valley X X X
Beamish, Tom City of La Habra x x X
Benavidez, David City of Santa Ana _ _
Carlene, David City of Stanton _ _ x
Cavecche,Carolyn City of Orange _ _ _
Daigle, Leslie City of Newport Beach _ _ _
Dow,Jim City of Buena Park _ _ _
Driscoll, Catherine City of Los Alamitos X X X
Garcia , Ron Ctty of Brea x X
Hansen, Don City of Huntington Beach _
Kang, Sukhee City of Irvine _
Kring, Lucille City of Anaheim _
Krippner,AI Midway City Sanitary District x x X
Narain, Prakash City of Cypress x x x
Nguyen,Janet Board of Supervisors
Dolan, Robert Costa Mesa Sanitary District X _
Palmer,Jim City of Tustin
Quirk, Sharon City of Fullerton
Reese, Brad City of Villa Park x x x
Reinhart, Douglas Irvine Ranch Water District
Rodriguez, Ralph City of La Palma — X X
Rosen, Mark City of Garden Grove
Shanks,Gordon City of Seal Beach
Hidepr,gmo\1501151\B5\DIRECTOR\Directm 07 Wkshp Atleneanm,dm
Strategic Plan Board Workshop No. 3
September 19, 2007
ACTIVE DIRECTORS
NAME ENTITY REPRESENTING SIGN IN
Anderson, Steve City of La Habra
G�
Antos, Charles City of Seal Beach n
Bankhead, Don City of Fullerton
Choi, Steven City of Irvine C
GW
Crandall, Larry City of Fountain Valley
Dalton, Bill City of Garden Grove
Davert, Doug City of Tustin
Dumitru,Jon City of Orange
Ferryman,James Costa Mesa Sanitary District
Freschi, Richard A. City of Villa Park
Green, Cathy City of Huntington Beach
Luebben, Phil City of Cypress
Marshall, Patsy City of Buena Park
Miller, Darryl G. Irvine Ranch Water District
Moore, Roy City of Brea
BOtQ�
Neugebauer,Joy L. Midway City Sanitary
Chris Norby Board of Supervisors
Parker, Ken City of Los Alamitos
Shawver, David City of Stanton
Sidhu, Harry City of Anaheim
Tinalero,Sal City of Santa Ana
Underhill, Constance City of Placentia
Waldman, Mark City of La Palma /n,
Webb, Don City of Newport Beach 9 T^
Winder,Jim City of Yorba Linda
H:\depNmoV50\151\BS\DIRECTOR\DirKtomSignInShe t.doc
Strategic Plan Board Workshop No. 3
September 19, 2007
ALTERNATE DIRECTORS
NAME ENTITY REPRESENTING SIGN IN
Aguirre, Joseph City of Placentia
Anderson,John City of Yorba Linda
Ayer,Guy)' City of Fountain Valley
Beamish,Tom City of La Habra
Benavidez, David City of Santa Ana
Gaiters, David City of Stanton
Cavecche,Carolyn City of Orange
C./
Daigle, Leslie City of Newport Beach
R/
Dow,Jim City of Buena Park
Ddscoll, Catherine City of Los Alamitos
Garcia, Ron City of Brea
Hansen, Don City of Huntington Beach
Kang, Sukhee City of Irvine
Kring, Lucille City of Anaheim Gym
Krippner, At Midway City Sanitary District `
Narain, Prakash City of Cypress
Nguyen, Janet Board of Supervisors ai
Dolan, Robert Costa Mesa Sanitary District
Palmer,Jim City of Tustin 01�
Quirk, Sharon City of Fullerton 0L
Reese, Brad City of Villa Park
Reinhart, Douglas Irvine Ranch Water District Q/ k
Rodriguez, Ralph City of La Palma
Rosen, Mark City of Garden Grove all
Shanks, Gordon City of Seal Beach
Kkkipt\gmo\l50V51\BS\DIRECTOR\Dine fors Sign In Sheetdx
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Clerk of the Board prior to commencement of the Board
meeting. As determined by the Chair, speakers may be deferred until the speck item is taken for
discussion. Remarks may be limited to three minutes or less. Any handouts (60 COPIES
REQUIRED) must be given to the Clerk of the Board prior to the meeting for distribution.
DATE SPEAKER NO. -7 AGENDA ITEM NO.
NAME: (please print)
HOME ADDRESS: (Optional)
(number/street)
(cityf//zziip code)
TELEPHONE:
REPRESENTING:
(self/name of organization)
S/GN-/N SHEET
ORANGE COUNTY SANITATION DISTRICT
STRATEGIC PLAN BOARD WORKSHOP NO. 3
SPEAKER NAME ORGANIZATION/FIRM
NO. Pleaseprint) lease int
1
2
3 '
4
5 746 u�
6
7 Y46V 1/w-dv S
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
H.QEW GM01150F1511BS\FORMSI.SIGN-IN FORM.DOC
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE & TIME: 08122/07
(BEAMISH) V .................ANDERSON...................— — — — — —
(SHANKS) .....................V NTOS .........................— — — — — —
(QUIRK) .........................4-BANKHEAD...................— — — — — —
(KANG) * ......................
...............*.....QHOI.......................... — — — — — —
(AYER).. ................... .. ................... — — — — — —
(ROSEN)......................../DALTON....................... —(PALMER)......................ADAVERT...................... — — — — — —
(CAVECCff.
)....................6uMITRU ................... — — — — — —
(OOTEN)4. .....................(ERRYMAN...................— — — — — —(REESE) Z. ...................✓/I`RESCHI .............. ..... — — — — — —(HANSEN) .,............ REEN ...................... — — — — — —
(NARAIN).V.......................CUEBBEN..................... — — — —
(DOW).............................L�MARSHALL.................. — — — —
.(REINHARTL....................✓MILLER .........................— — — — — —
(GARCIA).V..................."
,:;I�clo R .......................
(KRIPPNER)Z✓.............. UGE AUER.............. — — — — — —
(NGUYEN) .... ORBY .................... — — — — — —(DRISCOLL).:��::::::::::::::�.�ARKEI�:...................... — — — — — —
(CADENA) ........................SHAWVER.................. — — — — — —
(KRING).........................f-/SIDHU.......xt�....(i........ — — — — — —
(BENAVIDES).........OR. ..TINAJERO. ..?n.......... — — — — — —
(AGUIRRE) ... ANDERHILL ................. — — — — — —'ALDMAN....................(RODRIGUEZ
(DAIGLE) ......................jMEBB ..........................
(ANDERSON) ................ ./WINDER ......................
A�wu�z-
STAFF: u
Arhontes
Colson
Ghirelli
Herberg
Kovac
Kyle
Ruth
Torres
Tyner
OTHERS:
Ho in
08/22/07
H:\deptladmln\BS\DIRECTOR\Di..Wrs Roll Call.doc
LevelBoard Workshop If 3:
rvice
Air and .do
Distributed at i ..
Board of Directors
Level of Service
TH
Air Quality and Odor
Board Workshop No. 3
Orange County Sanitation District
September 19, 2007
Board Workshops
♦ Workshop 1 — Draft Strategic Plan
Wednesday, August 1 (5-7p.m.)
♦ Workshop 2 — Biosolids and GWR System
Wednesday, August 8(5-�:so p.m.)
♦ Workshop 3— Air Quality and Odor
Wednesday, September 19(5-a p.m.)
♦ Workshop 4 — Revised Strategic Plan & Wrap-up
Thursday, October4
Board Workshop#3: Level of Service
Air Ouality d Odor
Strategic Plan Schedule
Strategic Butlget
Planning Draft CIP Development
Aug Sep..g O�c��N,� Oec Jan Feb
200] � 2n0a
Approve Proposition Adopt Adapt
Strategic 218 Notice Rates Budget
Plan
Key Performance Indicators
1. GWR System — future participation?
2. BioSolids — 100% recycling?
3. �ISInteCtlOD — Deferred to Operations Committee
4. Odor — new of measurement standard?
5. Air Quality — reduce emissions?
Board Workshop#3: Level of Service
Air Quality d Odor
September ,
Air Quality
Air Quality
Level of Service Question
Should OCSD invest in air
pollution control equipment to
maintain / reduce
air toxics emissions?
Board Workshop#3: Level of Service
Air Quality and O
September 19, .�
OCSD Operates in the
Worst Air Basin
Mobile Sources Other Sources
regulated by EPA and State regulated by AQMD
I
Common Pollution Air Toxics
— Ambient Air Quality Standards — Risk•Based Standards
— Health Effects �
— Smog and Visibility Impairment (cancer,acute,chronic)
O
O
Air Pollutants
Board Workshop# 3: Level of Service
Air Quality and Odor
September 19, 2007
Source of Pollutants
Power
Generation
81%
Source of •
eP Mastewa
Powerer "n, Generationter.
50% Process ,
30%
-44
a,
Board Workshop# 3: Level of Service
Air Quality and ...
Modeling Cancer Risk
Public Cancer Risk= possibility of getting cancer
in the population of one million based on being affected
by emissions for 70 years, 24 hours a day, 7 days a week
Notification Level= 10
Action Level=25
Signgicant Level= 100
Employee Cancer Risk= possibility of getting cancer
in the population of one million based on being affected
by emissions for 40 years, 8 hours a day, 245 days a year
Regulated under OSHA
Risk in Perspective
Medical X-Rays
(one/year)
1 ,400 in Million
�q Drinking
a Diet Soda
L r (one/day)
,„ 70 in Million
. SOURCE'.Air Risk Inlonnation Support Center
Board Workshop# 3: Level of Service
Air Quality and OdoSeptember 19, r
OCSD Air Toxics Risk Levels
(Risk — number of individuals per million)
Mw r•Brdalron on desel engines
30
Aetlon LMI
No00atlon Loral
10
0
Vear 1999 2006 Modeled 2012 1999 Modeled 2012
Motleled Risk at Plant No. 1
Cancer Risk All Sources - 2012
i '
1 I .
- �� �ResitlanF.10 per million
� Maximum Expasetl Intlivitlual
_ Resitlen[(MEIR)
Gadieltl
Employee: 10 par million
Board Workshop #3: Level of Service
Air Quality . ..
September 19, ¢I
Modeletl Risk at Plant No. 2
Cancer Risk All Sources - 2012
{{jY�u � x ro°cJy L,•y.� �� 11";ryj(r� �'.
art a�x1 • r zi � I�
-� H ? ( m ♦� —tom' 'RAF +��Li�` ��16� _
', rn����+ _!f �flesitlenC 10 per million
Maximum Exposed Intlivitlual
�Ja�,���..(�y � Resident lMEIR)
,vey^��. Employee:10 per million
�Employee:25 per million
Proposed SCAQMD Rule 1110.2
Requires a Significant
Reduction of
Common Pollution
(smog)
Air Toxics
also reduced
Common Pollutant Levels
Board Workshop If 3: Level of Service
Air Quality and Odor
September •r
Common Pollutants —' Air Toxics
Gas Catalyst Raising Height
of Stacks
Air Toxics Air Toxics
Gas Cleaner Gas Catalyst
�l��l ���11�i��■ I�IIV�:
III
Air Toxics
Fan
Air Toxics=$17M
LAir Tozlcs+ Rule 1 t t a2=$31 M
Si]M $14M
CIP costs only
Alternative: Make Stacks Higher
♦ Plant 1 — raise stacks 10 feet
Plant 2 — air emissions controls still required
♦ Does not reduce emissions, only dilutes
♦ CEQA review, permit required
I ♦ SCAQMD Rule 1110.2 Adopted?
♦ Stack extension cost = $40Q,000
Board Workshop It 3: Level of Service
Air Quality and OdoSeptember 19, r
Air Quality Future
Level of Service Management Cost
Rule Delayed or Nat AOoptetl
atteaaCve r: Cost of mailing notifications
Ai
No Action and public outreach
(rere:Air rouas neaim�no0fiaatim)
Rule Delayed or Nat Adopted
Aaenialive 2'
Put in place Air Toxies Controls CIP=S77M
. . 08M=$1.5M per year
Rule Adaptetl:
Implement Rule Compliance CIP=$31M(s17M+Slant)
(iridutles Air Tom Contrds) Q&M=$3.3M per year
Projected Single Family
Residential Annual Rate Increases
zo%
� Air Toxice Control.
5293.49 5330.76
15% 6.39-9256.65_1a.66% 1a.6]%
13.15% 13.56°h
5200.13
9.96%
16°6
Fq
5%
_ Baseline SFR Rate Increase
0&09 a9-16 16-11 11-02 12-13 13-14
Fiscal Vear
Board Workshop # 3: Level of Service
Air Quality and .•
September 19, �;
Projected Single Family
Residential Annual Rate Increases
20
� Rule Compliance 5298.01 533528
lindutles Air Touts Controls) tfi.a3% 16.06%
5258.3a
15% 5226.50—/a.23%
1320%
5200.25
10.01% 5351.57
5%
Baseline SFR Rate Increase
ae-Os olio ia-n n-t2 i2aa i3-ia
Fiscal Year
Air Qualify
Recommended
Level of Service
Maintain / reduce health risk to below
notification levels using the most
cost-effective and technically
feasible approach.
QualityBoard Workshop #3:
vel of Service
Air "
Odor Control
Odor Control
Level of Service Question
What odor standard should
the District measure and build
12
facilities to?
Board Workshop #3: Level of Service
Air Quality and OdoSeptember 19, r
Existing Odor Control Program
Cleaned Air
13
Chemical Dosing
Treatment for Odors � � � qir Scrubber
Odor Treatment
�® __ Odors(Foul Air)
/ Sewage Treatment Processes
Entering OCSD
7runklines
in Service Area
�r s.
i
� �c
Board Workshop#3: Level of Service
Air Quality and OdoSeptember 19, r
Odor Control Program
Based on Hydrogen Sulfide Odor
Treatment Level
Discharge from 0.5 ppm H2S
Air Scrubbers
Sewer Line Odors 1.0 ppm dissolved sulfide
in Collection System
What Changed?
Re-Priortized CIP Projects
Board Decision to retluce rate impacts
Secontlary Treatment (new odor control budget)
Standards
2000 2002 2006 2007
Odor Control
Master Plan €
(HzS to DR Standard)
Implemented CIP Budget Evaluating LOS
14
with Odor DR Standard for odor control
for new projects board Workshop
Board Workshop#3: Level of Service
Air Quality d Odor
September0
Proposed LOS Based on Total Odor
vs. Hydrogen Sulfide Levels
at Fenceline
Diluted . . . n n n
Di I uted with
10 Volumes
of Clean Air
15
E nnn
N
' 1
E ,
OCSD Residents
Treatment Plant & Businesses
Total Odor Measurement:
Dilutions per Threshold (D/T)
Example of 10 DR:
s
1 Volume
Odorous
Air 50% or more
F
' ^ can detect
,� odor
Board Workshop If 3: Level of Service
Air Quality and Odor
Odor Control
Recommended
Level of Service
i . Establish odor standard based
on total odor (D/T)
z. Design all new projects to retain
odor within property boundaries
Our On-Going Commitment
16
to Reducing Odor Nuisance
Board Workshop#3: Level of Service
Air Quality and OdoSeptember 19, r
Enhancements to Odor Control
Wastehauler Controls Improvements to
91
17
Existing Facilities
Researching New Technology
for Primary Treatment Processes
1
, f -
Board Workshop# 3: Level of Service
Air Quality d OdoSeptember 19, r
New Technology Being
Implemented in Approved CIP
■uv16 -. .�„1 eIR `�R � k p,;l ; II11 i
What Additional Odor Projects
are Being Considered?
Estimated CIP Costs
♦ P1 Primary Treatment so -
go -
of Oontrol
♦ P2 Permanent Odor Facility $12.1 M
18
at Biosolids Truck Loading
$69.6 M
Board Workshop If 3: Level of
rvice
Air Quality . a..
September 19, ,r
What Additional Odor Projects
are Being Considered?
Estimated CIP Costs
♦ Pi Primary Treatment Scrubbers $11 M
♦ P2 Primary Treatment Scrubbers $41 M
♦ P1 Trickling Filter Odor Control
♦ P2 Permanent Odor Facility $12.1 M
at Biosolids Truck Loading
19
$11 .6 M
Proposed Odor Future
Control Strategy Management Cost
Baseline: Approved CIP(in baseline)
Currently Approved CIP =$101.7M
in Progress (completed in 2ot3) O&M=$5.9M
(total$9.5M after 2013)
attemaGve: Approved CIP(in baseline)
Add four additional odor =$101.7M+additional CIP$69.6M
control projects at both plants =$171.3M
(stan 2013,completed over 8 years) O&M=$9.SM+eddttionel$648,1100
aecommarMaflon: Approved CIP(in baseline)
♦ Add two additional odor =$101.7M+additional CIP$17.6M
control projects at both plants =$119.3M
(start 2012,completed over 4 years)
08M=$9.SM+additional$300,000
♦ Research primary treatment =$g,6M
odor control alternatives
Board Workshop#3: Level of Service
Air Quality and OdoSeptember 19, r
Projected Single Family
Residential Annual Rate Increases
20%
Attemaave:
� Adding Four Odor Projects to Approved CIP(569.6M)
15% t315.03$RWA9 5209.61 5]9T]9
13.9% 10.99% 10a5% 1205%
520002 j 5139b3$1fi3.1] 519fi1]
9P'e 9.95% 9.99% 931%
10% 53fiB.W fi.3fi%3 556312
-ReVieed— 03b3953fifi.0] ].]1% >.364:
Baseline fi.�z ].mz
5%
OB-09 09-00 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-13 19-20 20-21
Fiscal Vear
Projected Single Family
Residential Annual Rate Increases
20%
Recommendation:
■ Atltling Two Otlor Projects to Approved CIP(S77.fiM)
(at P7 TF and P2 Truckloading)
15% E2Z2,StI$249.9T5280.05§925.36
t299% 10.95% 10.19% 19%
3200.02 � j
20
10% 9.9x
—Revised— 5359.39 5371.50
fi.>tx 9.W% 5390.5]
B83GIi11G fi.9]%
5%
Y
0%
OB-09 0940 10-11 11-12 12-13 13-14 14-15 15-16
Fiscal Vear
Board Workshop#3: Level of Service
Air Quality and Odor
September 19, 00
Staff Recommendation
Add two odor control projects to
Approved CIP budget at additional cost
of $17. 0 and additional O&M cost of
$298,000 per year.
♦ Plant 1 Trickling Filter Odor Control
♦ Plant 2 Permanent Odor Facility
at Biosolids Truck Loading
Board Workshops
♦ Workshop 1 — Draft Strategic Plan
Wednesday, August 1 (s-7p.m.)
♦ Workshop 2 — Biosolids and GWR System
Wednesday, August B(s-�so p.m.)
♦ Workshop 3 — Air Quality and Odo21
Wednesday, September 19(s-a p.m.)
♦ Workshop 4 — Revised Strategic Plan & Wrap-up
Thursday, October4 (�7p.m.)
Board Workshop#3: Level of Service
Air Quality and OdoSeptember 19, r
Percent SFR Rate Increases
with Recommended LOS
20%
P°a � Air Oualiry
�?'- � Biosolids
13.1%_ 14.5% � Odor Control
O.B% fA3%
10%
—Hevisetl— z%
5% B85ellrle
0°6
06-09 09-10 10-11 11-12 12-13 13-1/ 14-15 15-16
Fiscal Vear
SFR Rate Increases
Dollars with Recommended LOS
per Vear
5500
$375 $385
5400 S33$ #0E15.58 E8.31
E292 $13.]2
5300 $255 54.47 _
$228 50.44
szB1 s1.e�
s1.3o
szoo
a
1
5to0
yt
06-09 09AO ID-11 11-12 12-13 13-14 14-15 1546
Fiscal Year
Board Workshop#3: Level of Service
Air Quality d Odor
September 19, rr
Comparison of SFR Rates
Dollars (Rates for Fiscal Year 2007-OB)
peg vear
S bJC
irBD
SJ00
5900 A°era a SPR =5282
5200 1
91De
5100 C ?
5 Q LL N W 7 f�
50
Comparison Agencies
SFR Rate Increases
Dollars with Recommended LOS
per Vear
5600
$500
Average SFR
with 5%IrAlalion $442
$400 $420
$367 S37$ 5383 53� '
5300 5338
5282
szoo
sloe
0]-0B De-09 09-10 10-11 11-1P 1P-13 13-14 10-15 16-16 16-0] 1]-iB 1e49 19d0
Fiscal Year
Comparison Study
Annual Single Family Residential (SFR) User Rates
Agency Fiscal Year
2007-08
Los Angeles County $ 108.00
Irvine Ranch Water District $ 163.80
Oro Loma Sanitary District $ 193.00
City of Fresno $ 212.04
Sacramento County $ 222.00
East Bay MUD (for FY 06-07) $ 237.96
Union Sanitary District $ 243.36
Central Contra Costa Sanitary District $ 300.00
Dublin San Ramon Services District $ 321.00
City of Los Angeles $ 344.88
Vallejo Sanitation/Flood Control District $ 417.00
San Francisco $ 441.00
City of San Diego $ 459.84
Average $ 281.84
Orange County Sanitation District $ 182.00
Revision 9117/07
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Notice and Agenda for the Special Board Meeting of Orange County Sanitation
District, to be held on September 19, 2007, was duly posted for public inspection in the
main lobby of the Districts' offices on September 13, 2007.
IN WITNESS WHEREOF, I have hereunto set my hand this 13th day of
September, 2007.
Penny M. 1 le,
Clerk of the Board
Orange County Sanitation District