HomeMy WebLinkAbout2006-10-25 ORANGE COUNTY SANITATION DISTRICT
October 18, 2006
17141962-2411 NOTICE OF MEETING
its:
17141 96 2-03 5 6
mailing address: BOARD OF DIRECTORS
P.O. Ba.8127 ORANGE COUNTY SANITATION DISTRICT
Poartsin valley.CA
92728-B127
m:reat add...:
10844 Ellis Avenue
Pountein valley.CA WEDNESDAY October 25, 2006 — 7:00 P.M.
9270E-7018
Me
mber
SKr DISTRICT'S ADMINISTRATIVE OFFICES
• 10844 Ellis Avenue
times Fountain Valley, California 92708
Anaheim
Brea
Buena Perk
Lypress
Feems. Way The Regular Meeting of the Board of Directors of the Orange County Sanitation
Fullerton
Barden crow, District will be held at the above location, time and date.
Hundn,tm Beach
IrWne
Le Habre ,
Le Palma
Los Alamitos
Newport Basch //I
ofenge
P ea Bard Se tary
Santla Ann
Said/Basch
Stanton
iusdn
use Part FAHR COMMITTEE -Thursday, October 26,2006 at 7:00 p.m.
Yorba Linea
agents or areas• OMTS COMMITTEE -Wednesday, November 1, 2006 at 5:00 p.m.
sanitary Districts PDC COMMITTEE -Thursday, November 2, 2006 at 5:00 p.m.
cesre Masa FAHR COMMITTEE -Wednesday, November 8,2006 at 5:00
Midway city Y, P.m.
water Districts GWR SYSTEM STEERING COMMITTEE -Monday, November 13,2006 at 5:30 p.m.@OCWD
lrNne Rench
LEGISLATIVE AFFAIRS -Tuesday, November 14, 2006 at 8:00 a.m.
STEERING COMMITTEE - Wednesday, November 15, 2006 at 5:00 p.m,
To maintain world-class leadership in wastewater and water resource management.
mm
BOARD MEETING DATES
'November 15, 2006
'December 20, 2006
January 24, 2007
February 28, 2007
March 28, 2007
April 25, 2007
May 23, 2007
June 27, 2007
•July 18, 2007
August 22, 2007
September 26 2007
October 24, 2007
`Meetings are being held on the third Wednesday of the month
H.WWMAPublk Agaim13201BS1Pgenda12006 Meeting NokesWN010.2.dx
I'
BOARD OF DIRECTORS Me Uag Date To Btl.of Dir.
10/25/06
AGENDA REPORT ttemNumbe Run Number
Orange County Sanitation District
FROM: James D. Herberg, Director of Operations and Maintenance
Originator: Simon L. Watson, Maintenance Manager
SUBJECT: RATIFICATION OF SCHWING PUMP EMERGENCY PURCHASE
ORDER
GENERAL MANAGER'S RECOMMENDATION
Ratify use of General Manager's emergency purchasing authority, Resolution No.
OCSD 04-08, for Purchase Order No. 57613 issued to Schwing Bioset for the purchase
of a Schwing Pump Hydraulic Power Pack and Controls system, for emergency
replacement of the existing Hydraulic system for a total amount not to exceed $150,000
to include all services, delivery and taxes.
SUMMARY
• The Schwing Pump Hydraulic Power Pack and Controls package units at Plant 1
transfer biosolids from the belt filter press buildings to the truck loading station
and have been in service for over 15 years (start up date of 211/1991).
• These units are the heart of the biosolids removal system, without them OCSD
can not move the biosolids from the belt filter presses to the truck loading
facilities and onto the trucks for disposal.
• One of the units (C-1) has failed and can no longer be repaired, as the needed
original parts are no longer available.
• With the failure of the C-1 unit, half of Plant No.1 now does not have a backup.
Failure of a second unit would cause half of the dewatering process to shutdown,
and this will not be adequate for the present Plant No. 1 flow.
• The normal Board pre-approval process would have delayed the repair and
increasing the risk of such a failure. Due to this risk and the 18-24 week delivery
time need for the new unit, staff recommended that emergency purchasing
procedures be used.
• Project No. P1-101: Sludge Dewatering and Odor control at Plant 1 which could
potentially replace this units is not scheduled to complete construction until late
2011
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
N/A
C:Mmumenls aM Se ngslkyle\L l SeNnOSlTempamry Inlemet RSS%0D 84< 'ntla Report(SrJl q Emer my)Watsan 10.21t8.Cac
Farm No..DW.103 Agwft RepW-BW m
Dept 3W
ReWsetl: 1024Yla0
Page 1
BUDGET IMPACT
® This item has been budgeted. (Line item: SP-3415803400)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
Capital funds from Project No. SP-34 Small Capital Equipment Replacement will be
used. This project was created to replace existing equipment that is beyond economical
repair or no longer supported and has a value in excess of$5,000 and a useful life of 5
or more years.
ADDITIONAL INFORMATION
The Schwing Pump Hydraulic Power Pack and Controls package units at Plant No. 1
transfer biosolids from the belt filter press buildings to the truck loading station and have
been in service for over 15 years (start up date of 2/1/1991). During this time, they have
operated almost constantly 24 hours per day, 7 days a week. One of the units (C-1) has
failed and can no longer be repaired (original parts are not available).With the increase
in biosolids resulting from the move to full secondary treatment, it is imperative that the
Orange County Sanitation District (OCSD) has all the units operational to meet the
operational requirements of the plant. Failure of the pump units is a threat to the
continued operation of Plant No. 1, therefore operations has declared the repair of this
equipment an emergency.
Performance Criteria:
Replacement of the Schwing Model 1100 S hydraulic power pack and control panel will
bring the unit up to current equipment standards, allowing OCSD to have the ability to
purchase manufactured specified OEM parts (which are no longer available for the old
units). Schwing Bioset is the only company that can provide this equipment as they are
the sole manufacturer of the unit. To restate, the Schwing units used at Plant No. 1 are
the heart of the biosolids removal system, without them we can not move the biosolids
from the digesters to the truck loading facilities and onto the trucks for disposal. With the
failure of the C-1 pump, the "C" side now does not have a backup pump. Failure of a
second pump would cause the "C"side of dewatering process to shut down and
biosolids loading would be cut in half, and this will not be adequate for the present Plant
No. 1 Flow. The normal Board pre approval process would have delayed the repair and
increasing the risk of such a failure. Due to this risk and the 18-24 week delivery time,
staff recommended that the emergency purchasing procedures be used.
Investigation:
Through Internet investigation and phone conversations, it was determined that
Schwing Bioset is the only vendor that can provide a complete package needed to
properly replace the power pack and controls system and integrate with the existing
equipment. This is supported by Schwing Bioset being the only company to provide
manufacturers recommended OEM parts and service.
C.Omumenla aoM Seai,ga Ay ocal SeMnga\Tempa Imam.,Filar\O"UV g.d.Report(sUm g Ema ncy)Wa%on 10.2 .Eoc
Foam No.DW-102 Agan0a ReW—Boal0
Dopl.32o ReirheE: t0Yt1/NM
Page 2
Quotations and Bids:
A quotation was requested from Schwing Bioset and a proposal was received on
October 13, 2006 for the following services, manufacture of new power pack and
controls to meet current pump specifications, installation of new power pack on site,
connecting and testing of power pack to existing pump, for a contract price of
$118,243.00. Schwing Bioset is the sole manufacturer for this style pump, no other
quotes or bids were sought.
ALTERNATIVES
Use the normal purchasing and Board pre-approval process which would have added 4-
6 weeks to the purchasing process. If this alternative had been used the unit would not
have been replaced for 22-28 weeks increasing the risk of failure of the backup unit.
The failure would have reduced Plant No. 1 capability to process biosolids in half and
thus the flow to Plant No. 1 would have to be reduced.
CEQA FINDINGS
N/A
ATTACHMENTS
None
C? ddcnnenb am seNngs*yieLLnl Sedings\Ten%xxaq Internet Fbs%OLUWgende ReW(SU ng Emergency)Watson 16Ydadec
F.NO.M-102 Agenda Report—Board
De0L J30 R.JW: 10I2I 00
Page 3
b
a
October 25, 2006
MEMORANQALM
TO: Chair and Members of the Board of Directors
Orange County Sanitation District
FROM: Jame? Ruth
Interim General Manager, Orange County Sanitation District
SUBJECT: October Status Report
The following monthly report outlining the Districts progress is submitted for your consideration.
1. Joint Campus
Substantial progress has been made in resolving traffic, safety and risk issues concerning
the concept of a joint campus between the OCSD and OCWD agencies. A resolution
outlining our commitment to continue working on this concept is being prepared and will be
submitted for your consideration at the November board meeting.
2. Director of Engineering Resignation
Dave Ludwin, our Director of Engineering has resigned to accept a position in the private
sector. I will be submitting a replacement plan along with a reorganization plan to the
Steering Committee and Board of Directors at the November board meeting.
3. Benefits Study
Consultant John Bartel has met with the FAHR Committee and members of staff and has
submitted a written report outlining benefit options and comparative data that our board may
consider as we begin to structure our position for labor negotiations. Mr. Bartel will meet
with the FAHR Committee on Thursday, October 26.
4. Streamlining of Board
A presentation of recommendations to streamline the board was held at a special board
meeting on Wednesday, October 18 with 18 members of the board attending. Several
recommendations were introduced by board members in attendance and have been
incorporated in a new draft which will be discussed at the October 25 and November 15
meetings.
5. Operational Reviews
A peer review of the engineering CIP process is being conducted by a professional task
force from the American Society of Civil Engineers. The review should be completed in
November. Additional reviews are planned by our internal audit team in HR and Safety and
Health.
Distributed at
Board Meeting
Board of Directors
Page 2
October 25, 2006
6. Management Training — "Profession of Management"
Our fourth training session of our managers group was conducted on Wednesday, October
18. Final sessions will be conducted in November and December to complete this effort to
build our bench and create a more effective team approach to managing the districts
business.
7. SARI Line
A meeting was held between participating agencies and the Irvine Company to discuss the
status of alternate design plans that could possibly reduce relocation costs. All parties
agreed to meet again after the November election when we will know the fate of the state
bond issue and what potential financial support we might receive if it's successful.
8. Community Meeting Thursday, October 19
A community meeting was held at Eader Elementary School to address the residents
concerns about odor, noise, dust and air pollution. Staff responded to the concerns and
provided updated status reports on our construction progress and what measures we are
taking to mitigate their concerns. Overall results of the meeting were positive.
JDR:cs
H:ldept1gmo11101110 AdminIRUTH JAMES1Status Repods 20DM102505 JDR Status report memo to eoard.doc
SUPPLEMENTAL AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
October 25, 2006— 7:00 P.M.
Agenda Posting: In accordance with the requirements of California Government Code Section
54954.2, this agenda has been posted in the main lobby of the District's Administrative offices not
less than 72 hours prior to the meeting date and time above. All written materials relating to each
agenda item are available for public inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to
the Board for discussion and/or action, it will be done in compliance with Section 54954.2(b)as an
emergency item or because there is a need to take immediate action,which need came to the
attention of the Board subsequent to the posting of agenda, or as set forth on a supplemental
agenda posted in the manner as above, not less than 72 hours prior to the meeting date.
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible.
If you require any special disability related accommodations, please contact the Orange County
Sanitation District Board Secretary's office at(714)593-7130 at least 72 hours prior to the
scheduled meeting. Requests must specify the nature of the disability and the type of
accommodation requested.
Items Continued: Items may be continued from this meeting without further notice to a Committee
or Board meeting held within five(5)days of this meeting per Government Code Section
54954.2(b)(3).
Meeting Ad ournment: This meeting may be adjourned to a later time and items of business from
this agenda may be considered at the later meeting by Order of Adjournment and Notice in
accordance with Government Code Section 54955(posted within 24 hours).
16. Other business and communications or supplemental agenda items, if any.
a. Proposal for Streamlining Board and Committee Functions
Recommended Action: Provide Direction to Staff
b. Ratify use of General Managers emergency purchasing authority,
Resolution No. OCSD 04-08, for Purchase Order No. 57613 issued to
Schwing Bioset for the purchase of a Schwing Pump Hydraulic Power
Pack and Controls system, for emergency replacement of the existing
Hydraulic system for a total amount not to exceed $150,000 to include all
services, delivery and taxes.
Wdept'agencIMBoard Agendast2006 Board Agendask102506 supplemental agenda—Final.doc
(, i
CALIFORNIA ASSOCIATION OF SANITATION AGENCIES
LM11 MEMBERSHIP INFORMATION
Via elec[ronfc mail
TO: CASA Members
FROM: Catherine Smith, Executive Director
RE: AB 1234 Compliance
DATE: October 24, 2006
As the AB 1234 compliance deadline of December 31, 2006 moves closer, we wanted
to alert CASA members of another training option available to governing officials and
managers.
The Fair Political Practices Commission (FPPC) has launched an online Ethics Training
course, which is available through the FPPC's website at:
htto://iocalethics.fooc.ca.aov or www.localethics.fooc.ca.aov
This online course is available without charge and is accessible 24/7. To take the
course simply click on the link, read the various screens, and answer the self test
questions. Once you have successfully finished the course, you must print the
certificate of completion as your evidence of the training. Currently no electronic
record is retained of those who successful complete the course online.
Special thanks to the League's Institute for Local Government, the County of
Monterey, AT&T Foundation, and other state and local agencies who assisted in the
creation of the online AB 1234 Ethics Training course.
If you have any questions or problems, contact: ab1234@fooc.ca.aov
CASA will continue to offer AB 1234 workshops at future conferences to assist
members with ongoing compliance requirements. CASA will provide a certificate of
completion as proof of your participation. Remember, AB 1234 requires (among other
things) that all local agencies that provide compensation, salary, or stipend to, or
reimburses the expenses of, members of a legislative body must provide ethics
training to local agency officials by January 1, 2007, and every two years thereafter.
Please feel free to contact CASA at (916) 446-0388 if you have any questions.
CASA • 1215 K Street, Suite 2290 ' Sacramento, CA 95814• (916)446.0388
(916) 231-2141 fax " www.casaweb.ora
Distributed at
'�A Board Meeting
REVISED
MINUTES OF STEERING COMMITTEE MEETING
Orange County Sanitation District
Wednesday, September 27, 2006, at 5:30 p.m.
A meeting of the Steering Committee of the Orange County Sanitation District was
held on Wednesday, September 27, 2006 at 5:30 p.m., in the District's Administrative
Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS: STAFF PRESENT:
Directors Present: Jim Ruth, Interim General Manager
Jim Ferryman, Chair Bob Ghirelli, Acting Assistant General Manager
Doug Davert, Vice Chair Nick Arhontes, Director of Regional Assets and
Carolyn Cavecche, Chair, OMTS Committee Services
Tod Ridgeway, Chairman, PDC Committee Jim Herberg, Director of Operations and
Darryl Miller, Chairman, FAHR Committee Maintenance
Jim Silva, County Supervisor David Ludwin, Director of Engineering
Steve Anderson, Past Board Chair Lorenzo Tyner, Director of Finance and
Administrative Services
Jim Burner, Engineering Supervisor
Directors Absent: Norbert Gaia, Information Tech Analyst III
Michael Gold, Legislative Affairs Liaison
OTHERS PRESENT: John Linder, Engineering Manager
Bradley R. Hogin, General Counsel Juanita Skillman, Records Manager
Don Hughes Ryal Wheeler, Maintenance Supervisor
Gail Garrett, Committee Secretary
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were none.
(4) REPORT OF THE COMMITTEE CHAIR
• Chair Ferryman reported on the status of the SARI line Memorandum of
Understanding (MOU) involving the five principal agencies (County of Orange [lead
agency], OCSD, SAWPA, OCWD, and Riverside County). It is scheduled for
consideration in October by the governing boards of each of the five agencies and our
October Steering and Board agenda for approval.
The MOU outlines roles and responsibilities for the design, construction, and
financing of the project and development of a financial plan to pay for the project.
Distributed at
_Board Meeting
Minutes of the Steering Committee
Page 2
September 27, 2006
The joint Policy Committee made up of board members and GMs of each of the
agencies will give policy direction and devise a financial plan;and the Technical
Committee will oversee and direct the technical work at the direction of the Policy
Committee
The principals will meet sometime in the next two weeks to begin discussions.
Chair Ferryman, Director Darryl Miller, General Manager Jim Ruth and Acting
General Manager Bob Ghirelli will attend.
• Chair Ferryman announced the upcoming committee meetings for October. A
workshop will be held on Wednesday, October 18 at 5 p.m. to discuss GM's
goals, as well as Board and Committee functions.
• A corporate table has been reserved at the 2007 Economic Forecast Conference
for Thursday, October 26, 2006 at the Hyatt Regency, in Irvine. Contact Gail
Garrett if you wish to attend.
(5) REPORT OF GENERAL MANAGER
a. Status Report
Interim General Manager Jim Ruth reviewed activities included in his September
Status Report.
• Bob Ghirelli has assumed his responsibilities as Acting Assistant General
Manager.
• The OCSD/OCW D Joint Campus report is scheduled for the October Steering
and Board.
• The first phase of mid-Management training has been completed.
• A draft document of the Succession Plan is being distributed for comment and
a report scheduled for the October FAHR Committee.
• Meetings with Union representatives have been scheduled to discuss time
frames for formal negotiations.
• The revised Nepotism policy is more comprehensive and defines the authority
of the General Manager. It was approved at the September FAHR Committee
meeting.
b. Legislative Affairs
Michael Gold provided a legislative update on the Design-Build bill and outlined
the key elements of Bighorn decision.
• The Design-Build bill has died due to the inclusion of a provision by the
public employee unions. Mr. Gold said we can introduce a bill at the
beginning of the 2007 Legislative Session which will probably pass quickly
since the local unions have already signed-off on the contracting and
training provisions.
• Director Anderson asked if staff was following the Bighorn decision related to
Proposition 218 and water rates. Director Miller expressed the importance of
the decision on his agency's setting of water rates and requested additional
information from General Counsel.
C. Interplant Gas Line Shutdown
Minutes of the Steering Committee
Page 3
September 27, 2006
Jim Herberg said the District interplant gas line does not meet Department of
Transportation (DOT) physical and administrative requirements. He
recommended decommissioning the line to get out of non-compliance with DOT
regulations. Mr. Herberg Indicated that it would cost about$50.000 for a
contractor to perform work to decommission the line, and that preparation of
contract documents and bidding the work would extend our non-compliance by at
least three months. Therefore, In the interest of time, staff is recommending that
the work be contracted to Jamison Engineering as a sole-source. Jamison
Engineering has performed similar work on the gas line in the past and can
mobilize immediately.
Following a lengthy discussion re costs and possible consequences, Committee
members concurred with staffs recommendation to decommission the line now to
come into compliance with DOT requirements. While the line Is out of service,
staff will assess whether to re-commission the line in the long-term.
(6) REPORT OF GENERAL COUNSEL
In response to a request for clarification at the last month's meeting, General Counsel Brad
Hogin said that lobbyist contracts cannot be based on percentage.
(7) CONSENT CALENDAR ITEMS
a. The minutes of the August 23, 2006 Steering Committee meeting were approved as
drafted.
END OF CONSENT CALENDAR
(8) ACTION ITEMS
a. MOVED, SECONDED AND DULY CARRIED: Direct staff to proceed with
preparing California Environmental Quality Act documentation and conducting
necessary public meetings for the annexation of nine remaining islands within the
Orange County Sanitation District.
b. MOVED, SECONDED AND DULY CARRIED: Recommend to the Board of
Directors to adopt Resolution No. OCSD 06-21, Declaring Support of Proposition
1 E.
Directors Carolyn Cavecche and Doug Davert opposed.
(8) INFORMATIONAL ITEMS
a. The Agenda Items scheduled to be reviewed by the Board's working committees in
March were reviewed.
b. The agenda items scheduled to be presented to the Board at tonight's meeting were
reviewed.
Minutes of the Steering Committee
Page 4
September 27, 2006
(10) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS. IF ANY
David Ludwin, Director of Engineering, reported that the CIP review will be perforated by the
American Society of Civil Engineers at a cost of$26,000. A report will be forthcoming by the end of
the year.
(11) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(12) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND/OR STAFF REPORT
There were none.
(13) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday, October 25, 2006 at 5 p.m. A
Legislative Goal Setting Workshop will be held prior to the Steering Committee meeting at 2:30 p.m.
The next Board Meeting is scheduled for Wednesday, October 25, 2006 at 7 p.m.
(14) CLOSED SESSION
There was no closed session.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 6:20 p.m.
Submitted by:
ail Garrett
Steering Committee Secretary
H We~np 41"MO CommXeoUMeWinuloslWl>CB SC MInNes OINFt 5 Jx
Revised Proposal :
Streamlining Board and
Committee Functions
�OJNI-j SANITAr/O�
a
2 9
Q
THE EN
o s
m c
am
October 25 , 2006EZ
Committee Restructuring
♦ Reduce number of committees,
from 8 down to 3
♦ Keep monthly committee meetings on
calendar and cancel if necessary due to lack
of business
♦ Keep policy matters in committees
♦ Labor negotiations and budget policy stays
with financial committee
Steering Meets once a month
Committee
♦ Advise Board on important policy matters
♦ Steer issues to appropriate committee
♦ Strategic planning
♦ Legislation
♦ Goals for general manager
Agenda Reports
♦ Reduce number and content of agenda reports
as proposed
♦ Maintain hard copy distribution of committee
and board agendas
Director' s Web Page
♦ Implement recommendation to create
Director's web page
♦ Post routine monthly and quarterly status
reports to web site
Delegation of Authority
♦ Continue current DOA for general manager —
$ 100 , 000 and up to 5% for amendments
and change orders
♦ On a case-by-case basis , establish percent
contingency for contracts and agreements
approved by Committees
♦ On a case-by-case basis, establish percent
contingency for contracts and agreements
approved by Board of Directors
Proposed
Delegation of Authority
ALL TYPES
Agreements / Amendments
Authority Contracts and Change Orders
General <$I00,000 5% of contract value managed
Manager by GM (no change)
>$i 00,000 to Percent contingency based
Committees <$200,000 on recommendations by GM
and approved by Committee
Board of Percent contingency based
Directors '$200,000 on recommendations by GM
and approved by Board
Other Issues Raised by Board
Members
♦ Formal process for nomination of Board Chair
and Vice Chair
♦ Term limits for committee assignments,
Committee Chair and Vice Chair and
Board Chair and Vice Chair
♦ Changes to Board procedures
5 A N R ly r�a�L
� n
o -i
4
1�� THE �����
OCSD Streamlining Workshop
Director's comments and concerns
5 pm —October 18, 2006
Director Comment
Sullivan Labor relations should be under the F &A committee. With
spending authority increased, the GM amount seems high.
Duvall Are director's not happy with the current make-up of things. What
was the trigger for this workshop. FAHR is finally delving into
meaty issues.
Christy Expressed concern about PDC change order and sole source
agreements as well as problems with the Board managing
contracts under new format.
Eckenrode Merging 5 committees into one is a concern. Length of meetings
are sometimes long now—could go longer with less committees.
Anderson Sub-committees were formed due to turmoil at the time. I trust
management now—the Board should not micromanage. Very
supportive of the concepts presented.
Davert We hired Jim Ruth to manage—we need to let him do that.
Sufficient checks/balances are now in place.
Parker Overall, a great idea. Would like to consider tens limits for Chair,
Vice Chair, Steering Committee and others.
Leubben Likes the recommendations, but concerned that the Steering
Committee would become a Super Committee. Other Board
members would lose power. Now may not be the best time to do
this. Complimented Jim Ruth's efforts. Thinks all committees may
still need to meet monthly' Had length of service issues similar to
Parker.
Fresch! Labor negotiations should not be with Steering Committee—
should be with FAHR. Doubling DOA—absolutely not!
Committee agendas should be printed in hard copy format.
Crandall Some concerns with DOA levels. Problems with committees
meeting only every other month.
Waldman Concerned that Steering Committee gets information way in
advance of other committees.
Duvall Complimented Jim Ruth. Wants no term limits for committees.
Miller Concerned about committees being limited to business
discussions without being able to raise policy issues.
Cavecche Wanted an example comparing old vs. new agenda items.
Wanted an example of policy vs. business issues. Expressed
concern over eliminating non-essential agenda items. Staff is
responsible for teaching the board. Still need a paper agenda.
Wanted more explanation of the DOA changes. Liked the
combined committee structure.
Duvall Used the insurance example as a discussion of a policy issue at
committee level.
Leubben Savings on meeting costs have little value to an agency spending
$1 million a day on CIP. Insisted that committees meet monthly or
would not support changes.
Freschi Voiced concerns about the chair and vice chair selection process.
Shawver Maintain four major committees and role the smaller ones into
them.
Ferryman Send your questions and comments to Jim Ruth.
Miller Hard to gauge all concerns in a group meeting. Suggested one
on one meetings with all 25 Board members.
Neugebauer Its an idea who's time has come.
Meeting adjourned at 6:30 pm.
Additional comments from Board members subsequent to the workshop.
Marshall Maintain "Alternatives" section in agenda reports and include
information re reimbursable vs. non-reimbursable costs for change
orders.
Committees should meet monthly
Maintain a permanent seat on the Steering Committee for a
member of the board of supervisors
Suggested changes to Rules of Procedure (Res No. OCSD04-15):
• log 3, (4) (a). allow Board Chair and Committee Chairs to
introduce agenda items in addition to staff or legal counsel.
• Pg 6, K. second paragraph, second line: define meaning of a
"unanimous ballot"
• Pg 10, (2). First paragraph: chairperson of a standing
committee should not be allowed to unilaterally appoint special
or ad hoc committees unless it is approved by a majority of the
committee members.
Suggested changes to Del. of Authority(Res No. OCSD04-08)
• Pg 9, Sec 3.09, line 4: define which Division may make
purchases.
• Pg 36, Sec. 8.02.B: all out of country travel, including trips to
Mexico and Canada, should require approval by the Board of
Directors.
Bankhead Maintain monthly meetings of the committees
Maintain a permanent seat on the Steering Committee for a
member of the board of supervisors
Ridgeway If the number and content of agenda reports are reduced as
proposed, build in a process to allow board members the
opportunity to pull up the information for review if they have an
issue or question about the item.
The nomination process for Board chair and vice chair should
include a requirement for candidates to submit a written statement
to the board of directors outlining their experience and
qualifications for the position and their platform
I
I
Resolution No. OCSD 04-15
Rules of Procedure Excerpt re Election of Chairperson and Vice Chairperson of
the Board
Section 1(E)(4)(g):
"A Chairperson and Vice Chairperson of the Board shall be elected by a majority
vote of Directors at the regular meeting in June of each year, and will assume
office July 1 St. The nominations for Chairperson shall be made at the regular
Board meeting in May of each year, and the nominees may prepare a statement
setting forth their qualifications for the office of Chairperson. The statements
shall be mailed to members of the Board of Directors with the Agenda and other
meeting material for the June regular meeting.
The nominations and election for Vice Chairperson shall be made at the regular
Board meeting in June of each year and shall be made immediately following the
election of the Chairperson. The elected Vice Chairperson will assume office
July 1st.
The Chairperson and Vice Chairperson shall serve at the pleasure of a majority
of the Directors. In the event the office of Chairperson becomes vacant due to
resignation or retirement of the incumbent prior to the expiration of the regular
term, the Vice Chairperson shall automatically succeed to the office of the
Chairperson and shall continue to serve through the remainder of the regular
term unless sooner removed by action of a majority of the Directors. In the event
the office of Vice Chairperson becomes vacant prior to the expiration of the
regular term, nominations and the election of a Director to serve in that capacity
shall be conducted at the next regular Board meeting. The person so elected
shall serve the balance of the regularly-scheduled term unless sooner removed
as a result of action by a majority of the Directors.
Subject to the provisions about serving at the pleasure of a majority of the
Directors, the Chairperson shall not serve more than two consecutive one-year
terms for which he/she has been elected to the office of Chairperson."
Presentation to the
Orange County Sanitation District
N 1 rgT�oy
Q
N� THE ENS\
October 25 , 2006
Distributed at
u s --Board Meeting
TPA Service Team
• Christopher Townsend , President
• Sean Fitzgerald , Southern California
Director
• Heather Dion , Senior Associate
• Jason Quimby, Associate
Year- End Review
Priority Legislation
• AB 2951 (Goldberg) allows public agencies to charge
other public institutions capacity fees and connection
charges. OCSD position : support. Signed by the
Governor.
• SIB 1317 (Torlakson) reallocates property tax from
enterprise special districts for the new power
generation . OCSD position : oppose. Signed by the
Governor
• AB 573 (Wolk) modifies indemnity clauses for design
and engineering related contracts. OCSD position:
oppose. Signed by the Governor
Year- End Review
Coalition Building
• In June, OCSD and TPA met with the Santa Ana
Regional Board to discuss future opportunities for the
District's grant program — specific to clean beaches
funding and water quality discharge improvements.
• In September, the new executive director of CASA,
Catherine Smith , met with staff and toured the District's
facilities. TPA is working with CASA to redefine the
statutory definition of "recycled water" to include treated
water that is discharged to the ocean , which would allow
the District to become eligible for additional grant
programs.
Year- End Review
Water/Wastewater Bonds
• In early 2006 the legislature failed to pass legislation to
place a water/wastewater bond on the November ballot.
However, AB 140 was passed , placing Prop 1 E on the
ballot — which includes $500 million in State Subvention
funds. Prop 84 also includes $ 100 million in State
Subvention funds. Currently, Orange County is owed
approximately $ 125 million in backlogged subvention
funding .
• TPA is working with legislative leadership to begin
developing principals for a water/wastewater bond for
the 2008 ballot. There is the indication of support for a
measure that deals solely with water and wastewater
infrastructure on a statewide scale.
What' s to Come
• Legislation :
• Enterprise Special District Property Tax
Protection .
• Trailer bill legislation related to the passage of
the bond measures (specifically, Prop 1 E and
Prop 84).
• Redefining the statutory definition of recycled
water that is treated and discharged to the
ocean .
Preparing for a 2008 Bond
• TPA is working closely with legislators in
Southern California and the Central Valley to
develop policy principals for a 2008 bond that
specifically allocates funding for infrastructure for
water and wastewater projects.
• Principals to be considered : 1 ) statewide
significance benefiting at least 40% of the
population ; 2) bond should pay for design ,
construction and environmental mitigation ; 3)
infrastructure reliability.
Questions?
STATE OF CALIFORNIA)
r ' ) SS.
COUNTY OF ORANGE )
Pursuant to California Government Cade Section 54954.2, 1 hereby certify that
the Notice and the Supplemental Agenda No. 2 for the Board of Directors meeting to be
held on October 25, 2006, was duly posted for public inspection in the main lobby of the
District's offices on October 20, 2006
IN WITNESS WHEREOF, I have hereunto set my hand this 20" day of October
2006.
I IMGI� �rlv-«c
Lilia Kovac
Assistant Board Secretary
Orange County Sanitation District
H:\DEPT\AGENDA\POSTING\COMMITTEE POSTING CERTIFICATION FORM.DOC
SUPPLEMENTAL AGENDA NO. 2
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
October 25, 2006-7:00 P.M.
Agenda Posting: In accordance with the requirements of California Government Code Section
54954.2, this agenda has been posted in the main lobby of the District's Administrative offices not
less than 72 hours prior to the meeting date and time above. All written materials relating to each
agenda item are available for public inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to
the Board for discussion and/or action, it will be done in compliance with Section 54954.2(b)as an
emergency item or because there is a need to take immediate action,which need came to the
attention of the Board subsequent to the posting of agenda, or as set forth on a supplemental
agenda posted in the manner as above,not less than 72 hours prior to the meeting date.
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible.
If you require any special disability related accommodations, please contact the Orange County
Sanitation District Board Secretary's office at(714)693-7130 at least 72 hours prior to the
scheduled meeting. Requests must specify the nature of the disability and the type of
accommodation requested.
Items Continued: Items may be continued from this meeting without further notice to a Committee
or Board meeting held within five(5)days of this meeting per Government Code Section
54954.2(b)(3).
Meelino Adjournment: This meeting may be adjourned to a later time and items of business from
this agenda may be considered at the later meeting by Order of Adjournment and Notice in
accordance with Government Code Section 54955(posted within 24 hours).
16. Other business and communications or supplemental agenda items, if any.
b. EMERGENCY REPAIR OF BIOSOLIDS TRANSFER PUMP AT
RECLAMATION PLANT NO.1
Ratify an emergency sole source purchase order to Schwing Bioset for
replacement of a Schwing biosolids transfer pump power pack in an
amount not to exceed $150,000 to include all services, delivery and
taxes.
H:NepllagendalBoard Agendas%2M Board Agen JW102506 supplemental agenda No.2a.doc
STATE OF CALIFORNIA)
_• ) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Supplemental Agenda for the Regular Board Meeting of Orange County Sanitation
District to be held on October 25, 2006, was duly posted for public inspection in the
main lobby of the Districts' offices on October 19, 2006.
IN WITNESS WHEREOF, I have hereunto set my hand this 19" day of October,
2006.
Penny M. IQ le, Board cretary
Board of Directors
Orange County Sanitation District
HADEFRGMOM 50M 51 IB&FORMSNGENDA CERTIFICATION-SUPPLEMENTAL.DOC
SUPPLEMENTAL AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
October 25, 2006 — 7:00 P.M.
Agenda Posting: In accordance with the requirements of California Government Code Section
54954.2, this agenda has been posted in the main lobby of the District's Administrative offices not
less than 72 hours prior to the meeting date and time above. All written materials relating to each
agenda item are available for public Inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to
the Board for discussion and/or action, it will be done in compliance with Section 54954.2(b)as an
emergency item or because there is a need to take Immediate action,which need came to the
attention of the Board subsequent to the posting of agenda, or as set forth on a supplemental
agenda posted in the manner as above, not less than 72 hours prior to the meeting date.
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible.
If you require any special disability related accommodations, please contact the Orange County
Sanitation District Board Secretary's office at(714) 593-7130 at least 72 hours prior to the
scheduled meeting. Requests must specify the nature of the disability and the type of
accommodation requested.
Items Continued; Items maybe continued from this meeting without further notice to a Committee
or Board meeting held within five(5)days of this meeting per Government Code Section
54954.2(b)(3).
Meeting Adjournment: This meeting may be adjourned to a later time and items of business from
this agenda may be considered at the later meeting by Order of Adjournment and Notice in
accordance with Government Code Section 54955(posted within 24 hours).
16. Other business and communications or supplemental agenda items, if any.
a. Proposal for Streamlining Board and Committee Functions
Recommended Action: Provide Direction to Staff
H:\deptagenda\Board Agendas\2006 Board Agendas\042606 supplemental agenda.doc
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE & TIME: 104/06— 7:00 p.m.
(SIMONIAN) .....................ANDERSON................... 6L w-
(SHANKS) ........................ANTOS ......................... v —
(WILSON) ........................BANKHEAD................... r _
(DUMITRU).......................CAVECCHE................... ✓ t]l3,�Lff. —
(GARCIA)..........................CHRISTY..................... v
(COLLINS)........................CRANDALL...................
(ROSEN)...........................DALTON....................... ✓ i —
(KAWASHIMA)..................DAVERT...................... r v
(WINDER).........................DUVALL......................
(UNDERHILL)...................ECKENRODE................. v
(SCHAFER) ......................FERRYMAN................... r
(FAUTEUX).......................FRESCHI .............. .....
(CHOI)...............................KANG.......................... a a —
(SONDHI)..........................LUEBBEN..................... r } SLL � �fr7�QY
(DOW)...............................MARSHALL.................. Sii93 — —
(REINHART).....................MILLER ......................... ✓ —
(BEAUMAN)......................MOORE........................ r
(KIRKPATRICK-PILGER) .NEUGEBAUER.............. ✓ —
(DRISCOLL)......................PARKER....................... ✓
(WEBB) ............................RIDGEWAY................... v ✓
(DONAHUE) .....................SHAWVER.................. 0, —
(HERNANDEZ) .................SIDHU.......................... &. a-
(CORREA)........................SILVA........................... ' ✓ _
COOK
(RODRIGUEZ)..................WALDMAN.................... v v
STAFF:
Arhontes ✓
Colson
Ghirelli
Herber v
Kovac
Kyle
Ludwin ✓ ( �lur�vnaw
Miles
Ruth r V
Torres ✓
Tyner ✓ �*^ n
OTHERS:
Ho in
09/20/06 V
H:NdepMdminSS\DIRECTORTimdm Roll Call.dw
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Notice and Agenda for
{{thhe��Regular Board Meeting of Orange County Sanitation
District to be held on a,;LV— k d ,�2)006, was duly posted for public inspection
in the main lobby of the Districts' offices on OCR ', , / . 2006.
IN WITNESS WHEREOF, I have hereunto set my hand this 1f day of
, 2006.
�N� 74(4
Penny M. K , Secret
Board of Directors
Orange County Sanitation District
HADEMHMPUBLIC AFFAIRSQ2MBSTORMVAGENDA CERTIFICATION.DOC
ORANGE COUNTY SANITATION DISTRICT
Date: October 18, 2006
Pleases To The Chair and Board of Directors
91C SW-2411 Orange County Sanitation District
r.e
17141952d 156 From: James D. Ruth, Interim General Manager
.Iw.x.e.mm
m.urq.aer.n: Subject: Board Letter
P.o Barn 8127
Fwrcein Valley.(A
92726.6127 OCSD to Host SSO-WDR Compliance Workshops
.Dsst.4are..:
10644 alk A,xnue The California Water Environment Association (CWEA), in conjunction with several
� Val*.M other professional wastewater associations,will be conducting four workshops in the
92709-7019 Santa Ana Regional Board's jurisdiction at the Orange County Sanitation District
(OCSD)on Tuesday, November 7 and Wednesday, November 8. Two sessions will
poan be held each day on the State Water Board's new electronic Sanitary Sewer
Overflow(SSO) reporting system, one in the moming and one in the afternoon in the
Cities Plant No. 1 Control Center Auditorium.
An.haam Each four-hour class is specifically designed by CWEA for the state for staff
Baana Pa k responsible for notification and reporting of SSOs. OCSD staff helped CWEA with
c'.c product development. Participants will team up to tackle example SSO situations
"" Fuvanes and report them in a database simulation to gain valuable training with the state's
F"IlWIt,ermn P g 9
B .n �aa new online SSO reporting system.
Hmbnglon Beach
ry ne
La Habra Participants will also receive general awareness information on the new statewide
La Palma General Waste Discharge Requirements (GWDR) Order 2008-0003-DWO for
tas Alamifas
Nenyart Beach sanitary sewer systems including elements of a Sewer System Management Plan
On,n9e (SSMP) required to be developed per the GWDR.
Placentia
same Me
Seal Been, Information on the GWDR program, schedule, and requirements can be found at
smnamnn www.cwea.org/sso. Registration is limited to 50 per half-day session. Online
✓a.PsH registration is available at www.cwea.ora/conferences. Please share this with city or
rerbe uneB agency staff who may benefit from this training.
C...tr 0 Or.ny.
Similar sessions will be held late October thru mid November in the San Diego and
9..ro.rr Districts also LA Regional Board's jurisdictions. In 2007 other statewide venues will host this
C"sra Mesa same training in the remainder of the Regional Board jurisdictions.
Midway oty
w.nr DiatHivts OCSD Conference Room Policy
lrvina Panoh OCSD has established a policy effective January 1, 2007 to limit room reservations
by outside groups to three months in advance. The demand for space for internal
meetings has reached a point where OCSD needs to control meeting room usage by
outside groups so that we can accommodate OCSD's staff needs. Outside groups
are defined as public/community groups who are not sponsored by staff members,
who would be responsible and attend the meeting. OCSD's new policy also includes
a Facility Use Application and a $25/hr. fee for the use of our facilities.
Tc maan[am.arid-class leade,sh,in eias[ewa[er and.aver rasa...e managemen[.
Board of Directors
Page 2
October 18, 2006
In addition, in the next few months OCSD will begin construction of a very large
pump station located near the front entrance of Plant 1. The construction will take
out a number of parking spaces in the Administration building parking lot and disrupt
traffic coming into Plant 1 through the front entrance. OCSD reserves the right to
cancel meetings if it is deemed necessary due to traffic and safety concerns.
Coast Keeper Magazine Article Reprint
Attached is a reprinted article about the Groundwater Replenishment System that
ran in a recent issue of Coast Keeper Magazine. Additional copies are available for
your personal use and distribution by contacting Bret Colson at 593-7120.
If you would like more information on any of the above items, please call me.
nn
James D. Ruth
Interim General Manager
JDR: g
X IOEPII II IP.GMBOARO LMEM3W%IWBOB Wp LTR WC
Attachments
O R A N G E C O U N T Y
r
>
1. "Of Sy u9
1
Aw
v r
t
�i v
i
• w � l .T 4` ���� k t
1 � -
F. ! 1
Inside This Issue:
Building the World's Largest
Water Purification Facility in Orange County
+ ft `
!loll
a � � .ate►
GROUNDWATER REPLENISHMENT:
A PURE SOLUTION TO ORANGE COUNTY'S WATER NEEDS
•
m
E
O
a
m
r
a
m
o
` r •
a '
2 Orange County Coasckeeper _
The water we drink today is the same
recycled water that the dinosaurs drank.
Through the natural water cycle, which is
evaporation , condensation , precipitation
and collection , Mother Nature has been
purifying and re-purifying the same
drinking water for billions of years .
Orange County Coastkccper 3
The problem is, Mother Nature never
banked on 30 million people living in
semi-arid Southern California.
p to this point,we've lived off our share Water District Board Member who recently went on
of water from the Colorado River and one of the monthly public tours, the protection of our '
from Northern California. But now groundwater basin is imperative. "We must keep sea-
with burgeoning populations in states water intrusion at bay,"said Chapman. "Our ground-
like Nevada, Arimna water basin is a tremendous asset we
and Colorado as well cant afford to lost."
as agricultural and environmental Harry Koike,a Fountain Valley
water needs,our imported water sup- resident, said he passes by the water
ply is getting pinched. district facility everyday. Though he
Conservation is important and - saw the construction going on, he
we've come a long way over the last wasn't aware of the project until
few decades, but Southern California attending the tour.Afterward, he said
in general — and Orange County in he was impressed with the process.
particular — needs a new, safe, and ` -w "They're taking bottled-water
reliable source of local drinking quality (water) and percolating it
water. Orange County Water District down into the aquifer," said Koike.
has the solution. "The tour was very educational and
The Groundwater Replenish- I'm glad I came."
merit (GWR) System takes water Mike Markus, RE. is the
from the Districts plant in Fountain t ' Assistant General Manager for the
Valley and purifies it to near-distilled Orange County Water District as well
wirer quality.The final product is 70as the He manager for the GWR
million gallons per day of very pure
System.. He conducts the monthly
H2O. In fact, the water is so pure tours and explains the smreof-the-art
that minerals need to be added to it process that starts with treated waste
to stabilize the water before it can be water and ends up with purified water
moved from the purification plant. that meets or exceeds all state and fed-
Half of the purified water will be piped to oral drinking water requirements.
Anaheim where it will percolate into the groundwater "Mother Nature has a four-step water purification
basin. The other half will be injected along the coast process and so do we," said Markus: "Microfiltration,
into Orange Counrys expanded scawater intrusion Reverse Osmosis, Ultraviolet Light with Hydrogen
basin, which protects our groundwater basin from Peroxide, and finally Natural filtration."
being contaminated with scawater. The process begins with water that goes through
The Orange County Water District currently hosts several processes at [he Orange County Sanitation
a tour of the facility in Fountain Valley on the fiat District. Once the water has been cleaned, a substsn-
Saturday of every month at 9:00 a.m. to literally walk tial volume is directed to the Orange County Water
people through the high-technology purification District for purification.
process. The fiat step of the Water District's purification
For Douglas Chapman, an East Orange County process is to pull the water through "straws" with
4 Orange County Coastkeeper
i
i
r
it
j
it
r '
it
rr
7 j
4�L� �• 1111 '+ .F, F ��y I 1 uWf YI .0
3 1 1 7■
aa-
All
.. ... jam. Vitt,
la
"Mother Nature has a four-step
water purification process and
so do we , " said Markus .
"Microfiltration , reverse osmosis,
ultraviolet light with hydrogen peroxide,
and finally natural filtration . "
Orange Counry Coastkc per 5
M
f
r
r vas t
To literally walk people
through the high-technology
purification process, the
Orange County Water
District hosts a tour of the
facility in Fountain Valley on
the first Saturday of every
month at 9:00 a.m.
6 Orange County Coasrkccper
I` ~ Opposite
t
for themselves just how the Guests on the tour get to see
. •
?' some of those pipes are.
f ``
Winners of the Governor's
Environment
ft a[ and Economic
,} .4
_Wftu't� Xflt Leadership Awards.
At- 4 _ • of the regularly
► • - • tours of the GWR
F �
microscopic pores in the sides of the straws. The President Philip Anthony. "The Groundwater
microfiltration "straws" remove suspended solids, bac- Replenishment System will provide us with local con-
teria and protozoa.Microfihration is the same technol- trol over a very high-quality water supply that helps
ogy used to process fruit juices, soda beverages and make Orange County more drought-proof"
baby food; and to sterilize some medicines that rannor In addition to reusing a valuable resource, the
be heated. purification process uses one-half the energy required
The next step in the process is a more familiar one to bring water here from Northern California. This
—Reverse Osmosis or"RO." RO is the same technol- makes the GWR System both economically beneficial
ogy used to produce many bottled waters. It is a very as well as environmentally sensitive. In fact, the project
effective, high-pressure purification process that recently earned the states highest environmental
screens out viruses, pharmaceuticals, minerals and honor, the 2005 Governor's Environmental and
other impurities, allowing only water molecules and Economic Leadership Award.
some low molecular weight compounds to pass "To be singled out as a leader in water reuse and
through. water efficiency in California, a state known for its
After that, the water is exposed to Ultraviolet Light innovative water conservation initiatives, validates the
with Hydrogen Peroxide, which is both a disinfection efforts of everyone involved in planning and building
system and an advanced oxidation purification process. the GWR System,"Anthony said.
The result is near-distilled H2O. The GWR System will be ready to go online in
Charles Daniher of Huntington Beach says he feels 2007.
the science is sound. "Astronauts have been using recy-
cled water in space for years. It was fascinating to see
that this process is being analyzed at the molecular Brian Lochrie is a vice president with Rmbel public
level. These guys really know what they're doing." Affairs in Lake Forest, CA. For more information about
After purification, the water goes into Mother the Groundtater Replenishment System, log on to the
Natures underground reservoir, Orange County's tcrbsite at wwtagwrrynem.com. To menx a spot on an
groundwater basin, be pan of our future water supply upcoming GWR System Tour,please call(714)378-3333
mixing with water from Northern California, the or e-mail the Orange County Water District at
Colorado River and the Santa Ana River. infoeocu'd eom.
"Orange County needs to diversify its water sup-
ply," said Orange County Water District Board
Orange County Coastkeeper 7
Groundwater
ww Replenishment System
A Pure Solution to Orange County's Water Needs
For more information, please write, call or e-mail:
Orange County Water District
P.O. Box 8300
Fountain Valley, CA 92728-8300
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708
714-378-3333
info@ocwd.com
www.gwrsystem.com
AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
October 25, 2006 —7:00 P.M.
1. Invocation and Pledge of Allegiance (Brea— Director Roy Moore)
2. Roll Call
3. Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, if any.
4. Appointment of Chair pro tem, if necessary
5. Public Comments
6. The Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors.
a. Report of Chair; consideration of Resolutions or recommendations, presentations
and awards
1. Follow-up discussion re Streamlining Board and Committee Functions
b. Report of General Manager
C. Report of General Counsel
7. Ratifying payment of claims of the District, by roll call vote, as follows:
ALL DISTRICTS 09/15/06 09/30/06
Totals $12,594,258.37 $24,184,642.95
DIRECTORS: Pursuant to Government Code Section 84308, you are required to disclose
any campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving OCSD. This requires that you identify the contributor by name.
Further, you may not participate in the decision making process to award a contract to such
party. For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with OCSD. For the specks of Government Code Section 84308,
please see your Director's Handbook or call the office of General Counsel.
10/25/06
Page 2
CONSENT CALENDAR
8. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. Order the minutes for the regular meeting held on September 27, 2006, to be
filed and deemed approved, as mailed
b. (1) Ratify Change Order No. 1 to Plant 1, Underground Storage Tank
Rehabilitation at Cengen Building, Job No. FE05-32, with Fleming
Environmental, Inc., authorizing an addition of$33,570 and 181 additional days,
increasing the total contact amount to $145,030 and 231 days; and,
(2) Accept Plant 1, Underground Storage Tank Rehabilitation at Cengen Building,
Job No. FE05-32, as complete, authorizing execution of the Notice of Completion
and approving the Final Closeout Agreement with Fleming Environmental, Inc.
C. (1) Receive and file summons and complaint re Butler v. Orange County
Sanitation District, Kings County Superior Court Case No. O6CO281, regarding
the Petition for Prescriptive Easement, and,
(2) Authorize General Counsel to appear and defend the interests of the District.
END OF CONSENT CALENDAR
d. Consideration of items deleted from Consent Calendar, if any.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
9. STEERING COMMITTEE
Consent Calendar
a. Order draft Steering Committee Minutes for the meeting held on September 27,
2006, to be filed.
b. Approve a Memorandum of Understanding between the County of Orange,
Orange County Water District, Santa Ana Watershed Project Authority and
Riverside County Flood Control District for the protection and relocation of the
SARI line, in a form approved by General Counsel.
Non-Consent Calendar
C. Consideration of items deleted from Steering Committee Consent Calendar, if
any.
10/25/06
Page 3
10. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMITS)
OMTS Consent Calendar
a. Order draft Operations, Maintenance and Technical Services Committee Minutes
for the regular meeting held on October 4, 2006,to be filed.
b. Receive and file Collection facilities O&M Division—Business Practices
Reinvention Effort Report dated September 2006.
C. Approve a Consulting Services Agreement with Black&Veatch for the Ocean
Outfall Booster Station (OOBS) Rehabilitation Assessment Study, Job No. J-99,
for an amount not to exceed $175,002.
d. Approve Change Order No. 1 to Purchase Order No. 102354 OB for purchase of
Ferric Chloride, Specification No. C-2005-247, issued to Kemiron Pacific, for a
unit price increase of$76.20 per dry ton for ferric chloride, increasing the total
price to$434.00 per dry ton plus tax for an estimated amount of$3,255,000 for
the period December 1, 2006 through November 30, 2007.
e. Receive and file the 2006, 120-inch and 78-inch Outfalls Inspection Report and
120"778" Port Book reports prepared by Undersea Graphics, dated June 20,
2006.
f. Approve the development and implementation of a Compliance Program with the
sanitary sewer system Waste Discharge Requirements (WDR) as required
statewide by State Water Resources Control Board Order No. 2006-0003-DWQ
issued on May 2, 2006.
OMTS Non-Consent Calendar
g. Consideration of items deleted from OMTS Calendar, if any.
11. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE(PDC)
PDC Consent Calendar
a. Order draft Planning, Design and Construction Committee Minutes for the regular
meeting held on October 5, 2006, to be filed.
b. Accept Plant No. 1, Plant Water VFD Replacement, Job No. SP-94, as complete,
authorizing execution of the Notice of Completion and approving the Final
Closeout Agreement with Shasta Electric, LP.
10/25/06
Page 4
C. (1)Approve plans, specifications, and addenda for P1 HR Building Fire Lane
Access & Additional Parking, Job No. FE05-17, on file at the office of the Board
Secretary;
(2) Receive and file bid tabulation;
(3) Reject all bids for P1 HR Building Fire Lane Access&Additional Parking;
and,
(4)Authorize readvertising for P1 HR Building Fire Lane Access&Additional
Parking, Job No. FE05-17R.
d. Ratify Change Order No. 3 to Headworks Improvements at Plant No. 2, Job No.
P2-66, with J.F. Shea Construction, Inc., authorizing an addition of$416,788 and
32 calendar days, increasing the total contract amount to$193,141,700.
e. Ratify Change Order No. 29 to Primary Clarifiers 16-31 and Related Facilities,
Job No. P1-37, with Margate Construction, authorizing an addition of$67,329,
increasing the total contract amount to $72,827,486.
f. (1) Ratify Change Order No. 1 to Laboratory Rehabilitation, Job No. J-88, with
Dalke & Sons Construction, Inc., authorizing an addition of$28,657 and 214
calendar days, increasing the total contract amount to $671,937; and,
(2)Accept Laboratory Rehabilitation, Job No. J-88, as complete, authorizing
execution of the Notice of Completion and approving the Final Closeout
Agreement with Dalke& Sons Construction, Inc.
9. (1) Ratify Change Order No. 12 to Gisler-Redhill Trunk Improvements, Reach
"A", Contract No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-
Redhill North Trunk Improvements, Contract No. 7-41; and City of Tustin Project
Nos. 6106 and 6151 with ARB, Inc., authorizing a deduction of$39,575, reducing
the total contract amount to $21,963,535;
(2) Ratify a Unilateral Change Order No. 13, authorizing an addition of$439,935,
increasing the total contract amount to $22,403,470; and (3)Accept Gisler-
Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill North Trunk Improvements,
Contract No. 7-41; and City of Tustin Project Nos. 6106 and 6151, as complete,
authorizing execution of the Notice of Completion.
h. (1)Approve a budget increase of$38,235 for Supplement No. 1 to the 1999
Strategic Plan Final Program Environmental Impact Report, Job No. J-40-5, for a
total project budget of$946,235; and,
(2)Approve Amendment No. 5 to the Professional Services Agreement with
Environmental Science Associates, providing for additional environmental
services for an additional amount of$5,706, increasing the total amount not to
exceed $574,206.
10/25/06
Page 5
PDC Non-Consent Calendar
i. Consideration of items deleted from PDC Consent Calendar, if any.
12. FINANCE, ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHR)
FAHR Consent Calendar
a. Order draft Finance, Administration and Human Resources Committee Minutes
for the meeting held on October 11, 2006, to be filed.
b. Approve Amendment No. 1 to the agreement with the State of California,
Department of Parks and Recreation, providing for a change to the billing
methodology for sewer services for Bolsa Chica State Beach.
C. Authorize extension of a service contract with Public Resources Advisory Group
(PRAG)for financial advisory services for an additional five-year period effective
November 2006.
FAHR Non-Consent Calendar
d. Consideration of items deleted from FAHR Consent Calendar, if any.
13. LEGISLATIVE AFFAIRS COMMITTEE
Legislative Affairs Consent Calendar
a. Meeting scheduled for October 10, 2006 was cancelled.
Legislative Affairs Non-Consent Calendar
b. Consideration of items deleted from Legislative Affairs Consent Calendar, if any.
14. GWR SYSTEM STEERING COMMITTEE (GWRSSC)
GWRSSC Consent Calendar
a. Order Joint Groundwater Replenishment System Steering Committee Minutes for
the meeting held on October 9, 2006, to be fled.
GWRSSC Non-Consent Calendar
b. Consideration of items deleted from GWRSSC Consent Calendar, if any.
10/25/06
Page 6
NON-CONSENT CALENDAR
15. Closed Session
CLOSED SESSION: During the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations, pending or
potential litigation, or personnel matters, pursuant to Government Code Sections
54956.8, 54956.9, 54957 or 54957.6, as noted.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives; or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted closed
session and are not available for public inspection. At such time as the Board takes
final action on any of these subjects, the minutes will reflect all required disclosures
of information.
a. Convene in closed session, if necessary
1. CONFERENCE WITH LEGAL COUNSEL RE. INITIATION OF
LITIGATION (Government Code Section 54956.9(c))
Number of Potential Cases: 1
2. CONFERENCE WITH LEGAL COUNSEL RE.ANTICIPATED
LITIGATION (Government Code Section 54956.9(b))
Significant Exposure to Litigation —Tort Claim from ARB, Inc.
Number of Potential Cases: 1
3. CONFERENCE WITH LEGAL COUNSEL RE. EXISTING LITIGATION
(Subdivision (a) of Section 54956.9)
Case: City of Los Angeles, et al., v. County of Kem, United States District
Court, Central District of California, Case No. CV 06-5094-GAF(VBKx)
b. Reconvene in regular session
C. Consideration of action, if any, on matters considered in closed session
16. Other business and communications or supplemental agenda items, if any
17. Matters which a Director may wish to place on a future agenda for action and
staff report.
18. Future Meeting Date: The next Board of Directors regular meeting is scheduled for
November 15, 2006, at 7:00 p.m.
19. Adjournment
10/25/06
Page 7
Agenda Posting: In accordance with the requirements of California Government Code Section 54954.2,this
agenda has been posted in the main lobby of the District's Administrative offices not less than 72 hours prior
to the meeting date and time above. All written materials relating to each agenda item are available for public
inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to the Board
for discussion and/or action,it will be done in compliance with Section 54954.2(b)as an emergency item or
because there is a need to take immediate action,which need came to the attention of the Board subsequent
to the posting of agenda,or as set forth on a supplemental agenda posted in the manner as above,not less
than 72 hours prior to the meeting date.
Public Comments: Any member of the public may address the Board of Directors on specific agenda items or
matters of general interest. As determined by the Chair,speakers may be defamed until the specific item is
taken for discussion and remarks may be limited to three minutes.
Matters of interest addressed by a member of the public and not listed on this agenda cannot have action
taken by the Board of Directors except as authorized by Section 54954.2(b). If you wish to speak,please
complete a Speakers Form(located at the table outside of the Board Room)and give it to the Board
Secretary.
Consent Calendar:All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the Consent Calendar by a
Director,staff member or member of the public in attendance,there will be no separate discussion of these
items. All items on the Consent Calendar will be enacted by one action approving all motions,and casting a
unanimous ballot for resolutions included on the consent calendar. All items removed from the Consent
Calendar shall be considered in the regular order of business.
Members of the public who wish to remove an item from the Consent Calendar shall,upon recognition by the
Chair.stale their name.address and designate by number the item to be removed from the Consent
Calendar.
The Chair will determine if any items are to be deleted from the Consent Calendar.
Items Continued: Items may be continued from this meeting without further notice to a Committee or Board
meeting held within five(5)days of this meeting per Government Code Section 54954.2(b)(3).
Meeting Adioumment: This meeting may be adjourned to a later time and items of business from this agenda
may be considered at the later meeting by Order of Adjournment and Notice in accordance with Government
Code Section 54955(posted within 24 hours).
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible. If you
require any special disability related accommodations, please contact the Orange County Sanitation District
Board Secretary's office at(714)593-7130 at least 72 hours prior to the scheduled meeting. Requests must
soectty,the nature of the disability and the Noe of accommodation requested.
10/25/06
Page 8
NOTICE TO DIRECTORS:To place items on the agenda for the Regular Meeting of the Board of
:Directors, items shall be submitted to the Board Secretary no later than the close of business 14 days
.preceding the Board meeting. The Board Secretary shall include on the agenda all items submitted by
:Directors,the General Manager and General Counsel and all formal communications.
.Interim General Manager James D. Ruth (714)593-7110 i"h(dacsd.com
Acting Assistant General Manager Bob Ghirelli (714)593-7400 mhirel igi�ocs&wm
;Board Secretary Penny Kyle (714)593-7130 ukvle@ocsd.corn
Mirector/Engineering David Ludvnn (714)593-7300 dludvrina-0cad com
Direolor�nance&Admin Services Lorenzo Tyner (714)593-7550 Ityneraocsd.com
Director/Information Technology Patrick Miles (714)593-7280 omiles(docsd.cem
iDirector/Operations&
Maintenance Jim Herberg (714)593-7020 iherbero0ocsd.com
;Acting Director/Technical Services Ed Torres (714)593-7080 etonesB)ocsd.cem
Director/Regional Assets&
Services Nick Arhomes (714)593-7210 namomes(alocsd oom
;General Counsel _Brad_Hogin 71( 4)564-2808 _bho in s-law.com _
H:WepMagendaS8 rd Agendas\2006 Board Agendas\102506 ageMa.dm
t Meeting Date To 8d gl Dlr.
BOARD OF DIRECTORS t0lzsios
J AGENDA REPORT Rem Numbe item Numbe
Orange County Sanitation District
FROM: Lorenzo Tyner, Director of Finance and Administrative Services
Originator: Lenora Crane, Executive Assistant
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION
DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
CONFLICT OF INTEREST NOTIFICATION
Pursuant to Government Code Section 84308, you are required to disclose any
campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving the Orange County Sanitation District. Further, you may
not participate in the decision making process to award a contract to such party.
For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with the District.
In general, you must disclose the basis of the conflict by identifying the name of the firm
or individual who was the contributor.
For the specifics of Government Code Section 84308, please see your Director's
Handbook or call the office of General Counsel.
SUMMARY
See attached listing.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
N/A
Form N0.M-1024 IpwW Rw -FMR
Oep ]20 0.wne] t0118(lCLB
Page 1
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. Copies of Claims Paid reports from 09/01/06 to 09/15/06 and 09/16/06 to 09/30/06
Form No,DV 10 Ppsiea Re -FMR
Cepl ]YJ RmxE: 1bIG2Wb
Page 2
Claims Paid From 09101106 to 0S115106
Wama Nm Vendor Amount Description
Accoutre Payable-Warrants,
84076 Black&Veatch Corporation S 292.350.64 Engineering Services P1-102&J-A
B0079 Carollo Egan em 40,949.95 Professional Services Pl-Tt
84080 IPMC do Pmsons 871,840.00 Engineering Services-Integrated ProgramlProject Management.Temporary Staffing,Mat'l.&Supplies
U081 KemBon Companies,Inc- 135.860.60 Ferric Chloride
84082 Malcolm Pimb,Inc. 101.296.76 Professional Services 5-50,1-24&1.10
84083 MOB Consulting 43,032.36 Prolica l Surveying Services 1-24
a4084 Mogen Company 29705.64 Installation of Brendan W rich
840 S NRG Thermal Services.L.LC. 9D,483.12 Construction J-79
84086 Orange County Water District 131.695.75 Groan Mass Project(GAP)Water
84087 PionaerAmedces,Inc, 258,106.50 Sodium HW.hbrita
84088 Polydyne.Inc. 44,213.99 Dellonfe Polymer MO 3.11-92
slow Samen Engineering.Inc. Si Construction-Manhole Rehab.Project&Fold&Reform PVC Pipolletal cf Small Ola.Senator Pipe
$4090 Tetra Tech,Inc. 38.776.87 Professional Services]5]
84091 Tub RanchlMagan Farms 219,502.94 Resitluals Removal MO i29-95
84092 US Metro Group.Inc 30,172.50 Janitorial&Floor Maintenance at Plants 1 is 2
84093 US Peroxide,L.L.L. 256,166.22 Odor&CWrosion Central Treatment for Col.Sys.;Hydrogen Peroxide&Ferrous Chloride
84094 Kiewit Pacific Co. 332,511.313 Construction""&5-52
MOB Wells Fargo Bank Mac C7300.012 35.9,15.70 Comeback.551&552.Retention
84095 Chicago True Company 5,996,WD.00 North County Collections Yard project 15414-Final Payment
M097 American Telephone If Telegraph Cory. 217,35 Long Distance Telephone Service
84098 AWChesherbn 714.85 Mechanical Paris&Supplies
84099 ADTECH 282.00 Electrical Parts&Supplies
U100 Air Claiming Solufions 3376 Freight Chagas
U101 Angara Safety.Inc. 7,315.11 Safety Supplies
U102 Applied Industrial Technology 25.14 Mechanical Pads Is Supplies
U103 Aquatic Bbessay and Coregi ing Labs.Inc. 785.00 W1w1en Effluent Toddly Testing
U104 Arimna Instrument 1.014.50 Instrument Repair&Mantenance Services
84105 AT&T CalRomalMCI T27.06 Telephone Service
U106 American Telephone&Telegraph Corp. 26.40 Talghone Service
U107 American Type Culture Collection(ATCC) 83.20 Lab Paris&Supplies
84106 Awards&Trophies Cemetery 94.55 Awards&Plaques
84109 Basic Chemical Solutiore,L.L.C. 6,136.18 Sodium Bigger,&Sodium Hydroxide
U110 Battery Speda9ies le5.26 Balance
54111 Bauer Compresws 1,928.73 (2)How Fargo W100'Hass,
U112 Batley and Cicero,Inc. 668.05 Boston Whaler Burl Cover
U113 Bee Man Post Cartel,Inc 247.00 Pest Control
U114 Bell Pipe&Supply Co. 56.26 Mechanical Pert&Supp0es
84116 Brown&Caldwell 11.925.85 Prolesoning Services Pl417
U116 Bush&Associates,Inc, 15,036.00 Professional Services 741.549,552&7-36
U117 Col Glees.Inc. 302.77 Lab Equipment Senora
U116 California Relocation Services,Inc 75.00 Office Fiber MONnglRebcation Services
U119 CALPERIA 295,00 Training Registration
64120 Cable,Inc. 1.032.41 Mechanical Parts&Supplies
U121 CEM Corporation 497.00 Lab Parts&Supplies
64122 Cingular Nsreless Airtime 474.57 Wrelass Services
84123 Clausing Service Center 1.117.11 Loth Rack
U124 Cosa)Fire Equipment 5,635.26 Annual Fire Extrguisher Inspection&Servicing at PBe 1&2 and Pump Slations
U126 Cole Former Instrument Co. 193.81 Lab Pena&Supplies
V126 Compliance Services.Inc. 960.00 Professional Servers-DOT Pipeline Jurisdictional ReviewofOCSD HPDG Pipeline in Fountain Valley
U127 Compressor Compensate of California 1,460.09 Mechanical Paris&Supplies
U126 Computer Prolec6on Technology,Inc. 9,862.50 Computer Batenes Maintenance Agreement
HMePwrAPXCAdBMM,W9NRP.tlama Pai4aRonieaoMWeP/aaapaa-0 11 UHIBITA
suppose Page 1 of 6 rm1620e6
Claims Paid From o9ro11116 W O9n51116
Warrant No, Vendor Amount Description
U129 Consolidated Elect Distributors,Inc. 640.30 Ememical Pads&Supplies
64130 Consumers Pipe&Supply Co. 175.46 Plumbing Pads&Supplies
U131 Corporate Business leaders 3.140.91 Miscellaneous Office Furnhum
84132 Command Express 1,5W.77 Office Supplies
84133 County Wholesale Electric Co. 64.57 Electrical Paris&Supplies
54134 CWFA Membership 100.00 Membership(Calif.Water Environment Assoc)
84135 DiMarich-Post 360.41 H.dweie
M136 Dapper Tim Co. 1.233.47 Truck Time
M137 David's Tree Service 4.151 Tree Meet Service
M138 Devise Technical Products 300.55 Repair&Maintenance Services-Slide Gale at Plant 2 Mier Junclicn Box
U139 Dewrik Water Controls 1,829.W Mechanical Pads&Supplies
9414D Dunn Edwards Corporation 7176 Paint Supplies
84141 E.Sam Jones Distributors,Inc. 452.97 Electrical Pads&Supplies
84142 Earth Ted1.Inc. 8,657.65 Professional Services 3.55
84143 Electrical Reliabiliy Services 2,350.00 Professional Services-Elecricah Reliability Testing for Capital Projects
841" Enchanter.Inc. 7.700.00 Ocean Monitoring&Oudall Inspection&Maintenance
84145 ENS Resoarso,Inc. 10.000.00 Prefim.10al Services-Legislative Advocate
M146 Enbdl Instruments.Inc. 401876 Lab Parts&Supplies
54147 Everyure Water Solutions.Inc. 142.23 Mechanical Pads&Supplies
U148 Fisher Scientific Company,L.L.C. 7A32.36 Lab Pads&Supplies
P149 Rich.Inc. 3,OOO.00 Annual Surveillance Fee for Series 2000 A&B Cadgcales of Partiupation 08AtA6 to 07-31-07
M150 Flo Systems,Inc. $76.79 Pump Parts&Supplies
M151 Foodcreff Coffee&Refreshment Services 257.25 Meeting Supplies
84152 Forestry Suppliers 109.31 Lab Paris&Strophes
84153 Fountain Valley Paints,Inc 317.54 Paint Supplies
54164 Garrett Callahan Company 6=00 Chemicals
84155 GBC(General Binding Cary) 59.24 Stationery&Office Supplies
$41% GiedirA4&IICreII,Inc. 1,400.00 Freight Charges
84157 Dialed Stab Wet.Company 101.40 Water Use
84150 Grimaad,Inc. 1.252.23 Instrument Pads&Supplies
84159 Held do POnton Industries 602.41 Lob Pads&Supplies
84160 HamM Primrese has 140.00 Ice For Samples
84181 HDR Engineering,Inc 3,481.00 Professional Services P242
$4162 Hew idi Parked Company 2.081.73 (3)HP LJ3390 Premiums
64163 Hill Brothers 4.IW.01 Chemicals-Odor&Corrosion Control-Newport Trunkline
541M Home Depot 1,670.87 Misc.Repair&Maintenance Malarial
84166 Industrial Distribution Group 2,02D70 Mechanical Paris,Supplies&Locks
84166 Industrial Metal Supply " Metal
64167 Industrial Threaded Products,Im 2,434.88 Inventory Fasteners
84165 Inland Petmbum Equipment and Repair.Ids. IA57.00 Repair&Maintenance Services-UST Testing
84169 Irvine Pipe&Supply 105,25 Plumbing Pads&Supplies
U170 Joys Calering 1.945.83 Meeting Expenses
U171 JMH Consulting 3.000.00 OrsSee Tram,-Hiring Top TBIon9Lagel likems
84172 Johnstone Supply Mod Electrical Pegs&Supplies
U 173 KleinWlder.Inc. 12,45435 Soil.Concrete&Other Materials Testing-P2-86&J+TT
U174 Konnla Kim Film Ad 8902 Pidum&Award Framing Services
84175 Lee&go,Inc 5,214.78 Professional Services P241-3
84176 Liquid HBMBng Systems 967.62 Pumping Supplies
U177 London Education Services 179.00 Tell Registration
M178 Lusbe-CBI IAW.98 OCSD Ma hauler Truck Decals
84179 M.J.Schiff and Associates.Inc 9.487.W Prof.Seems.-Impaction of ONFell,Current Testing.&Baker Force Main Corrosion Evaluation
84180 Maintenance Products,Inc 5,333.63 Mocherical Paris&Supplied
H:tlsgmacaxcELa.v3lTwvwfleN].ne PaaflymmaTaatro Pm fl4pM O lsaa EXHIBITA
oviDw Page mlerzm
Claims Paid From 09101106 to 09115106
Warrant No. Vender Amount Dasorlplion
84181 Maintenance Technology Corp 923.42 Mechanical P.O.&Supplies
84182 Mandic Motora 146.00 Towing Sehvkes
84183 McMaster Can Supply Co. 1,010.48 Mechanical Pads&Supplies
84184 MM pleat Associates 322.48 Freight Charges
114185 MMway Mfg.&Machtning Co. 1,519.28 Repair&Reconditioning of High Pressure Cylinders
04106 Mollon Industries.Inc. 4,715.28 Instrument Paris&Supplies
IMIS7 National Technology Transfer,Inc.. 8.305.00 On-Site Training-Nalksal Electrical Code
841H NAFA.Inc 435.00 Membership
84189 National Plant Services,Inc 460.00 Vacuum Truck Services
841N Neadar Wael 124.91 Carimmef SolMareMerdwem
$4191 Neel Supply Co. 1,336.10 Plumbing Supplies
84192 Newark Electronics 432.40 Electrical Parts&Supplies
84193 Ne8lel Communications 885.48 Cellular Phone.&Air Time
841" Nickey Petroleum Co.,Inc. 1,337.66 Hydraulic Oil
84195 Ninw&Moore Corporate Accounting 150.00 Professional Services-Ross,Concrele&Other Materials Testing-P 1-37
8419E The Norco Companies 382.88 Mail Delivery SeMce
84197 No Way Laser Ergraving 190.15 Meet Tags
114198 Office Depot Buelneea Servces Division 2,806.38 Office Supplies
84199 OMRON IDM Controk,Inc. 3,255.00 Instrument Repair&Maintenance Services
84200 Onesoume Distributes,Inc. 3.380.48 Electrical Pads&Supplies
84201 Orange County How Company 99.80 Hydraulic How Supplies&Parts
$4202 Orange County Vector Control Dlslric 327.52 Past Control
$4203 Orange FIUM System Technologies,In . 135.32 Plumbing Pads&Supplies
84204 Oxygen Service Company 3,457.16 lab Pads&Supplies
8406 Pacik Mechanical Supply 127.63 Plumbing Supplies
84206 PBS&J 926.00 Professional Samlces 241
84207 PCG Interred. 700.00 Pump Repalm
$4208 PCS Express,Inc 272.93 Coulter thermos
84209 Portrait,Inc 73.04 Lab Parts&Supplies
84210 Primary Source Office Furnishings.Inc. 4,071.87 Office Furniture&Mix.Equipment
84211 Prinlerguy, 3,309.12 Printer Maintenance
84212 Propipe 8,738.76 Sewedins Cleaning-City of Tustin&Unincorporated County Prosody
84213 Prudential Ore all Supply 2,926.34 UMlomn&Raised Artistes
84214 R L Abbott&Associates 3,0011.00 Kam County Riosolids Consulting Services
84215 RBF Controlling 20.992.23 Engineering Service,2-2&1
84216 R.F.MacDonald Cc 9,495.00 Repair Maintenance Services-Cleevor Brooks Boller
84217 RMS Erginesdng&Design,Inc. 7,115.00 Enng.Svcs.-Eval.of North Co.Meant.Yard;Pump Room Fir.Drains at Digesters R&S;&Concrete Rp,
84218 RS Hughes C..,Inc. 140.98 Paint Supplies
04219 Rolland Tool&Supply 929.75 Mechanical Pad.Or Tools
84220 Schenck Trebel 136.87 Mechanical Paris&Supplies
84221 Schneider Automation,1.. 2.891.86 Computer Malnlenmum
84222 Science Applications International 6,103.84 Ocean Monilming MO 6-6-94
SWIMS See RIM Electronics,Inc. BB9.00 lab Instrument Maintenance&Calibration Services
U224 SETAC 532.00 Meeting Reportage,Division 820
U225 Shamrock Supply Co..Inc 1.141.63 Mecancml Paris&Supplies
U226 Shuraluck Rates&Engineering 404.92 Mechanical Paris&Supplies
84227 Sigma AMrich,Inc 5.763.03 lab Pens&Supplies
84228 Slmlm.Inc. 1.764.73 Lab Parts&Supplies
84229 Software Howe lntemesonel 15.120.00 Software Maintenance&Support-Go"
84230 Southern California Edison 9.202.25 Power
"231 Southern California Trans Service 3.795.46 Compressor
84232 Sovlhwesl Concrete 493.16 Concrete
Nwpw4h¢Itcel.auviaaysHnxEwwn.Pa4aepy1e60nCIr.M vau napon-Dlhsm EXHIBITA
.vttgx Page 3 of 6 1wi&
Claims Paid From 09101106 to 09115/06
Warrant No. Vendor Amount Description
54233 Spading Instrument,Inc. 3.746.88 Micros.Flow Meter
842U Specialized Environmental,Inc 4.885.00 EnvirOnmenfel Abatement Services
U235 Summit Steel 88.80 Metal
84238 Sunset Industrial Pads 246.08 Mechanical Pert&Supplies
84237 Systems Solution Company 405.08 Repairs&Maintenance Services-Araess ConmoUCCTV Security System
84238 Thermo Electron North Ammce,L.L.C. 1,230.00 lab Pads&Supplies
U239 Thompapn Industrial Supply.Inc. 1,348.91 Mechanical Pad.&Supplies
84240 TMV Systems Engineering,Inc. 1,625.00 Software Maintenance-SCADA
84241 Tory's Lock&Safe Service&Sates 80.20 Locks&Kays
84242 Tempest 4.2B2.77 Immanent Supplies
84243 TriSite Seminar On-the-Riser 100.00 Training Registrabon
84244 Truck&Arta Supply,Inc 1,840.g8 AutOmpdae Pads&Saluda.
64245 Tustin Unified School District 109.00 Meeting Expenses-Room Rental Re Tustin Annexation
84246 UC Regent 5.075.45 Professional Services,-Strategic Process Study Research Project
54247 UC Regent 12 .00 Training Regttralion
84246 Ultra Scientific 264.28 Lee Pads&Supplies
34249 United Parcel Service 43.78 Parcel Services
U250 United Pumping Service 1.089.63 Pumping Service
84251 United Rentals,Inc. 286.09 Sloping Paint
84252 Vsmud,Calibmia 789.96 Telephone Senators
84253 Viafen Communications Co. 2,208,83 Mobda Radios&Battery Supplies
84254 VL Systems.Inc. 877W Professional SeM s-Network Support
U255 Vortex Corp. 600.0e Repair&Maintenance Services-Epinemng Trailer Blue Gab
84256 V WR Scinntific Product 2,687.10 VD Pads&Supplies
U257 Wadsit Automation Notion America 3.710.35 LSVB Spark Plugs
a4258 Made Sensery Supply 591.57 Janiferial Supplies
U259 VJEF 258.00 Membership-Water Environment Federation
84260 WEFTEC 2.026.00 Twining Registration
54261 Mat Life Supply Company.Inc 275.0 Electoral Peels&Supplies
84262 Mstem States Canirots 1,219A1 Instrument Pads&Supplies
84263 Mean Soldiers,Inc 14,055.00 Outside Laboratory Services-Core Cceen Monitoring Program
84264 Wright Way Development 320.00 Instrument Repair&Maintenance Services
U265 YalelChase Materials Handling,Inc. W.85 Electoc Cad Pads
84266 3D Instruments L.L.C. 951.65 Instrument Parts&Supplies
84267 Michael J.BaneB 1,013.0 Meetin ifTwining Fxpense Reimbursement
84268 Kimberly R.Formers 28.00 Meetirgfliduning Expense Reimbursement
84299 MtrAeel 1.Gold 161.32 Meeting/Twining Expense Reimbursement
U27D legal G.HeltMend 55.88 Meeting/Twining Expense Reimbursement
U271 Larry J.Jones W.00 Meetin,ritaning Expenu Reimbursement
U272 Urnesh N.Monty 150.00 Mee0rglTraining Expanse ReMburvmenl
U273 Set Patel 225.00 MeegrggRwinirg Expense Reimbursemenl
01274 Doug Rulispn 178.13 MeetingRwtairg Expense Reimbursement
U275 Duane T.Smith 85.00 Melling/Twining Expanse Reimbursement
84276 Pierre Wong 12&00 MeetingRwinirg Upense Reimbursement
84277 Orange County Sanitation Dialect 8.861.76 Miele.Camp.Reimb.
84218 James W.Silva 1,084.71 Me tfingRwining Expense Reimbursement
U279 American Express 31,591.90 Purchasing Card Program,Mix.Supplies&Services
U280 Jamison Engineering Contractors,Ix. 31,369.39 Professional Servkaa SP-68-1
$4281 Lea&Ro,Inc. 181.418.20 Professional Services 549
84282 Samm.Engineering,Inc 32.055.00 Construction-Manhole Rahee.Project&Fold&Reform PVC Pipe/Rehab.of Small Dia.Sewer Pipe
U283 So Cal Gas Company 33,347.09 Natural Gas
84284 ARS.Inc. 64,108.55 Construction Tll
N WepNMFXLELmaIaaTl•PSWV1EVPaYna Pus xepnmo)`4eim PY.qpm-pe1aM EXHIBIT A
"am Page 4 of 6 UY16400)
Call Paid From 09101106 to 09115006
Warrant W. Vendor Amount Description
04285 American Airlines 1,502.50 Travel Services
84M APWA 139.00 Publication
84287 Arch Wueless Operating Company,Inc 978.52 Wrelass Services
84280 ASIS 437.00 Publication
84289 AT&T Universal Biller 2,918.09 Telephone Service
84290 AT&T Callfomiai 3W.63 Telephone Service
84291 A~ 585.00 Training Registration
84292 Bank Chemical Sofolions,L.L.C. 2,979.43 Sodium Hydroxide
84293 Califamia Dept.of Child Support 98.62 Wage Garnishment
84294 Compressor Components of California 19,329.40 SVB Pilot Fuel Valves
84295 CSI Computational System 4,7".00 Maintenance Agreement-Instrument Vibration Analyzers
84296 D.R.McNeal&Associates 1.690.00 Training Registration
U297 Del Mar Analytical 2,122.00 Analysis of Bioeolids
84298 OLT Solutions,Inc. 8,613.95 thmcdc Licenses&Web Support-MAP 2007&RASTER Design 2007
84299 Ecology Control Industries 19.870.18 Hazardous Mile Disposal
ai EMED 1.515.O7 High Security Barriers
84301 Employee Benefits Specialists,Inc. 10.535.15 Reimbursed Prepaid Employee Medical&Dependrad Care
U302 Employment Development Dept. 0.319.00 Slate Unemployment Tax
84303 Court Older 420.00 Wage Gamishmenl
843" FEDEX Corporation 205.84 Freight Services
U305 Franchise Tax Board 1".34 Wage Gamishmenl
84305 Geday Associai Inc WAS Investigation Services
84307 Hi Standard Automotive 1.617.57 Automotive Pan&Supplies
84308 H81 Brothers 6,525.60 Chemicals-War&Corrosion Conlral-Newport Trunkline
84300 Intermit Revenues Service 125.00 Mae Garnishment
U310 Ind.Union of Oper.Erg.AFL CIO Local 501 4,494.60 Dues Deduction
84311 Lance Soil and Lwghm! ZL661.25 Professional Services-Internal Auditors
84312 Liebert Cassidy 63.00 Professional Service-Human Resources
U313 Court Older 150.00 Wage Garnishment
84314 McMaster Can Supply Co. 47.83 Mechanical Parts&Supplies
84315 Court Older 225.00 Wage Garnishment
M16 National Bond&Trust 2,756.67 U.S.Savings Bonds Payroll Deductions
84317 OCEA 620.03 Dues Deduction
Si Peace Officers Council of CA 1,540.00 Ouse Deduction,Supervisors&Pmfrsuponals
84319 PlonearAmerira;too 3,424.75 Sodium Hypocblonle
U320 Printeguy 2,745.96 Printer Maintenance
84321 PS JON 99.00 Nolkes&Aft
U322 Ouitm Shepherd Machinery 588.50 Equipment Rental
U323 RS Hughes Co.,Inc 130.74 Paint Supplies
U324 Stale of California 200.00 Fish&Game Permit-Notification of Lake or Stream Alteration
84325 Seminar Information Service,Inc. 99.00 Training Registration
U326 Siemens Water Technologies Corp. 1.467.67 Service Agreement-Of Water Systems at Plants l&2
84327 SKC Met,Inc. 657.28 Chemicels
U328 COW Older 721.50 Wage Gamishment
U329 South Coast Air Duality Management Dist. 18.843.42 Permit Fees-Annual Emission,Operation&Misc.Fees
84330 South Coast Air Quality Management Dist 90.09 Permit Fees-Annual Emission,Operation&Misc.Fees
84331 South Coast Air Quality Management Dist 91 Permit Fees-Annual Emission,Operation&Misc.Fees
84332 South Coast Air Qualiy,Management Via 242.32 Parma Fees-Annual Emission,Operation&Misc.Fees
U333 South Coats Air Quality Management Dist 90.08 Permit Fees-Annual Emission,Operafion&Misc.Fees
84334 South Coast Air Quality Management DisL 242.32 Parma Fees-Annual Emission,Operation&Mks.Fees
84335 South Coast Air Quality Management Die. 90.06 Parma Fees-Annual Emission,Operation&Misc Fees
84336 Smith Coast Air Quality Management Dist. 3,048.60 Permit Fees-Annual Emission.Operslion&Misc.Fees
11.Mepwem6xceLauvzowaluAErcaSro Paeapmrosanrsmmsoaa 8gan-oal5aa EXHIBITA
out'. Page 5 of 6 In162116
Clalma Paid From 09101106 to 09115MO
Innocent No. Verdict Amount Description
84307 South Coast Air Duality Management Dist B0.08 Permit Fees-Annual Emission,Downturn 5 Misc.Fees
84336 South Coast Air Quality Management Dist. 15,411.34 Permit Fees Annual Emission,Operation B Misc.Fees
84339 South Coast Air Quality Management Dist. 90.08 Permit Fees-Annual Emission,Oesretian 8 Misc.Fees
MUD South Coast Air Quality Management Diet. 242.32 Permit Fees-Annual Emission,Operation 8 Misc.Fees
8430 Spiritism California Edison 3,015.72 Power
M342 The Stair Company 103.80 Training Supplies-CPR
84343 Systems Solution Company 425.00 Repairs&Maintenance Services-Access CoatmL/CCTV Security System
84344 TCH Associates,Ix. 8,226.86 Lab Pads 8 Supplies
84345 T-Mobil. 108.12 Kneless Air Tons
114346 Todd Painting,Inc, 3.528.00 Paining Services
8430 Union Bank of California 2,203.00 Annual Adminhussaiva Fee for Series 2003 Ceaficern of Particpation
84348 United Parcel Semites 29.75 Parcel Baryons
84349 Uniled Spain Postal Service 5,000.00 Postage
843M United Way 60.00 Employee Contributions
64351 Varimn Caftma 118.45 Telephone Services
54352 V WR Scientific Products 1.530.48 Lab Pens B Supplies
U353 Watentad Management Council 30.00 Membership 2006.07
84354 Wane Banner,Supply T6.48 Jandonal Supplies
U355 VJEF Registration Dept. 155.00 Training Registration
SQ56 West Life Supply Company,Inc. 94.71 Electni al Parts 8 Supplies
M357 Workforce Software,Int. 20.000.00 Prolosional Sam..-J-104
U358 Wumbus Corporation 1.088.50 Salety Video
84359 Court Order 597.50 Wage Garnishment
54W Union Bank of California 3.374.15 Construction 721.Retention
84361 Leyns T.Baroldi 1,516.80 Maetidg/iraining Evpanse Reimbursement
84362 Patrick B.Carnahan 718.82 Meding?raininp Expense Reimbursement
84383 Steven R.DeMile 1,053.33 Mestirgrtraining Expense Reimbursement
84354 Ellie Harvey 18.00 Meetingrtmining Expense Reimbursement
84385 Michael N.Morey 710.20 Meetirgrtratnirg Expense Reimbursement
84366 Elan Ray 614.83 MeetirgRremon,Expense Reimbursement
84367 CMM 620.00 Training Registration
64366 Disneyland Resold-Group Tickets 2,450.00 Rebnbursed Employee Activities
TOMI Accounts Payable-Warren% 810,01$,8 3-4
Payroll Disbursements
34745 - 34752 Employee Peychecle 3 2,303.52 Interim Payroll Ogro12006
34753 - 34932 Employee Paychecks 137,439.83 Biweekly Payroll 08I13106 and Voided Checks
34933 - 34939 Employee Psychedts 2.647.67 Inanm Payroll and VOMetl Check 0911 We-08/14186
130625 -13118T Deed Deposit Statements 1,136,903.48 Biweekly Permit OWIM6
Total Payroll Disbursements 3 1,27%314.50
Wire Transfer Payments
OCSD Payroll Taxes B Contribution 8 666,326.65 Biweekly Payroll OWI MS
Deutsche Bank 495.099.59 Series 2006 Certificates of Participation August Interest Payment
Lloyds TSP Bank plc 11.360.77 Series 2001 COPS Standby Purchase Agree.Commitment Fee(Adjustment to 05-01-08 to 0841-06 Billing)
JP Mogen Chase Bank 122.112.52 Sens 1993 Refunding Certificates of Participation August Interest Payment
Total Wire Transfer Payments 55 1,294,699.53
Total Claims Paid UBM1ro6-0W15816 312,58O258.37
RMgq'®aE%CELdaa3aAP$I44PE4Mnu Oep RpN'NaT[bMSPma aeoon-mts4a EXHISITA
curt. Page 6 of 6 1wtV11e
Claims Paid pram 09116M6 to 09130M8
WamaMNo. Vendor Amount Oescripuon
Accounts Payable-Warrant
84369 Air Products&Chemicals $ 26JIN.OT 0&M Agreement Oxy.Gen.Sye.MO 6-8-69
U370 Blue Cmss of California 404,411.94 Medical In nymar Promium
U371 Cardbck Fuel Systems,Inc. W.269.T3 Fuel Card Program-District Vehicles&Monitoring Vessel
U372 Corporate Image Maintenance,Inc. 33.750.00 Custodial Services Spec.No.OOM9 9
U373 Delke&Sons Constructions,Inc. 63,845.00 Carubuctian FEOS-26
U374 Delta Dental 57.69015 Dental Insurance Plan
U375 Hill Brothers 31,131.01 Chemicals-Odor&Corrosion Control-Newporl Tmokline
U376 Keiser Foundation HeaBh Plan fi0,T40.63 Medical Insurance Premium
U377 Kemiron Companie&Inc. 131,697.99 Fe0ie Chloride
U378 Occidental EneW Marketing.In . 141,OT0.44 Natural Gee Our CmGnCcGen
84379 Orange County Water DiMrid 6,750,510.50 Joint GARS Protect Ja6
84WO Parsons Wafer&Inlrestrudum.Inc 27,889.71 Professional SawicesJaS-1
84MI Pioneer Americas.Inc. 202.175.31 Sodium Hypochionts
84382 Potydyne,Inc 41,735.92 Cationic Poll MO 8-11-92
84383 RBF ConsuNrg 117,877.29 Ergineenrg Services T<T
84384 S.A.Smith 37,000.00 Claim Setllsment
84385 Southern California Edison 358,090.24 Power
84386 Tule RenchAsagan Farms 230,019.63 Residuals Removal MO 3-211
84387 USE Financed Services,Inc 37.416.99 Remarkeling Fee-200O A&B Series Advanced Reducing COPS
84388 US Peroxide.L.L.C. 145.097.23 Odor&Corrosion Cmltrul TrealmeM br COIL By..;Hydrogen Peroxide&Ferrous Chloride
M89 Anew International 428,182.59 Construction 1.24
WOO Voided Check - -
U391 J F Shea Construction.Ina 6,O67,168.49 Construction P2.66
U392 Margate Conslrudion,Inc. 335,269.00 Constmdion P"7
84393 Morrow Meadows Corp. 442,270.00 Construction P247-3
84394 Voided Cheri - -
84395 J F Shoe Construction.Inc 299,911 Construction l77
84396 Mono.Meadows Corp. 64,000.00 Construction FE0249&FEW-60
U397 J F Sbea Conwtruation,Ira OW.2T9.02 Construction P2-74
84398 A W Cheslarbn 8,630.11 Mechanical Pads&Supplies
94399 Absolute Standards.Inc. MAO Lab Pads&Supplies
WOO ACCU Stud, 375.50 Lob Pals&Supplum
U401 ACR Systems.Inc. 237.11 Cernputor Hsm1. B4fiw9re
UO2 Atrgas Safety,Inc. 5,230.92 Solely Supplies
U403 Airport-NJ881 9.30 Demurrage
8"Oul American Red C.. 23000 CPR Training&Mgcellaneous Supplies
64405 Amtach Etovator Services 1,400.00 Moudd,Elevator Maintenance at PIte.1 8 2
MOO APpleOne Employment Service 7.610.46 Temporary Empoyment Services
U407 Apparel Industrial Technology 1,846.64 Mechanical Paris&Supplies
844M Aquatic Biosystems,Inc. 265.00 Lob Paris&Supplies
84409 Archie Ivy.Inc. 4,038.00 Repaint Roodway Markings
W10 AT&T Unheraal Biller PS.OS Telephone Service
U411 AT&T CeGbmishil l 14.96 Telephone Service
W12 American Telephone&Telegraph Corp. 25.02 Telephone Service
U413 Autadesk UniyersernEntonquise Event 1.496.00 Meeting Registration-Division 240
84414 Bask Chemical Solutions.L.L.C. 23,1132.O7 Sodium BisulBla&Sodium Hydroxide
U415 Battery Specialties 169.61 Bananas
U416 BBII Pipe&Supply Co. $19.30 Mechanical Pads&Supplies
H:MePNle6XC6LalaU2QAP61NRP6bNeP dRga1C6aT4pWm Report-Dawes EXHIBIT
gNllah Page 1 of Its,.
Claims Pala From 09116116 to 0N30a6
Warrant No. What, Amount Description
84417 Banned Bowen Lighthouse 3,750.97 Instrument Paris&Supplies
84418 Black&Veatch Coryaretion 4,979.00 Engineering Services-Seismic Assessment of North County Yard
84419 Boyle Engineering Corporation 8,431.18 Preflu sbnel Services 1.24
Is"N Brand"Pacific,Inc 11,229.44 Sodium Hypochlorite
64421 Brawn&Caldwell 1,784.59 Professional Services-Sedimbte Solids Investigation at Pit.2
U422 Business Publishers,Inc. 287.00 Books&Publications
U423 Culligan Water Condemning 3,000.92 Maintenance Agreement-Water Condilioning
U424 CA Emissions Program 5.36 Automotive Emissions Program
U425 California Fil"tion Sets and Service 331.97 Air Fifters
84426 California Relocation Services,Inc. 574.75 Office Fite MovingfRebralion Semces
84427 Cameron Compression Systems 2,480.69 Mechanical Pads&Supplies
U428 Candela CorpmMicn 133.84 Electrical Supplies
U429 Cemllo Engineers 280.49 Professional Services P240
U430 Casual Gourmet 88.30 Meeting Evponses
84431 Charles P.Crowley Co. 9.172.76 Pump,Pump Pans&Supplies
W32 Cirguha Wheless AOkne 5,145.44 Vibration Services
84433 City of Westminster 1,100.45 Water Use
84434 CMAA 85.00 Meeting Regstation-Division 750
84435 Coal Film Equipment 594.78 Fire Exlingulshers
84436 Coal Plumbing 710.00 Plumbing Services
U437 Columbus Analytical Services,Inc. 2.328.00 Analysis of Millimeter,Industrial Wastewater&Biorecad3
84435 Conscience,Services,Inc. NO.OD Engineering Services-Interplant High Pressure Digester Gas Line
84439 Compressor Components of California 8,960.00 Repair&Maintenance Services-(32)LSVB Pilot Fuel Valves
84440 CompuCom Systems,Inc 1,973.51 Computer Hardeare/SoBware-Cisco
Nast Confident Technologies 8,510.00 Software Support-NEO 8000
84442 Consolidated Etctricel Distributors,Inc. 3.WS.72 Electrical Pads&Supplies
U443 Consumers Pipe&Supply Co. 6.016.14 Plumbing Pads&Supplies
84444 Control Techniques Drives,Inn 4.940.77 Instrument Parts&Supplies
84445 Corporate Business Interim 232.00 Recenfigumdon of Office Cubicle-Plant 1 Human Resources Bldg.
844" COrporete Express 1,322.32 Office Supplies
84447 Contact Engineering 747]7 Pump Paris&Supplies
84448 County of Orange Auditor Controller Si Encroachment Permit 7-39
84449 CR&R,Inc. 1,575.00 Container RenMN
844N CSAMSCO 4.371.75 Mechanical Pants&Supplies
U451 C.S.M.F.O 272.00 House;&Ads
84452 Culligan of Orange County t8.15 Menl.Agreement-Can Gan Water Softener System
84453 CWEA Membership 330.00 Membership(Calif.Water Envimnmenl Assoc.)
84454 Detection Instruments Corporation 2.809.09 leard mBdt Repair&Calibration Services
84455 Dunn Edwards Corporation 317.05 Paint Supplies
84496 E.Sam Jones Distributors,Inc. 161A2 Electrical Pants&Supplies
84457 Ecology Control Industries 7,953.84 Hazardous Waste Disposal
84450 Ecology Tire,Inc. 904.00 Waste Management-Tires
84459 Electrical Reliability Services 6.107.00 Pmtabnal Services-Electrical Reliability Tesfing for Capital Projects
94460 Employee Benefits Specialist,Inc. 639AS Reimbursed Prepaid Employee Medical&Dependent Care
84461 Enchanter,Inc. 3,500.00 Cooled Monitoring&Outiell Inspection&Maintenance
U462 Smooth Instruments,IAC. t9,e48.90 Instrument Pads&Supplies
84463 Environmental Resource Center 1,347.00 Training Registration
84454 Emiionmentel Resource Associates 1.397.84 Lab Parts&Supplies
84465 Eqa-Chlor 2,295.16 Hydrochloric Acid
HemPwmBxc6L.msamuvarwrsxuem PW apsmaantlumPam apwr.oaaoaa EXHIBIT B
mouse, Page 2 of 8 1tl1b10g0
Clams Paid From 09118106 to 09GIOU
Wamant No. Vendor Areoua Description
U466 Ewing Winston Industrial 1.807.98 Landscape litigation Pads&Supplies
U467 Express Lens tab 1,505.59 Safely Glasses
84468 FEDEX Corporation 337.50 Freight Services
8409 Ferguson Emotprial Inc. 393.37 Valves
U470 Feel American Real Estate Saudi. 420.00 On-Line Orange County Property Information
U471 Fisher Scientific 4,117.34 Lab Parts&Supplies
U472 Flo Systems,Ines 9,005.88 Pump Pad.&Supplies
84473 Forted Engineering&Surveying.Inc. 6,W2.11 Surveying Service;-VariOm Capital Projects
U474 Franklin Covey 87.42 Office Supplies
80475 Fresco Profiles 422.00 Human Resources Background Check.
84479 Fred C.Gllben Co. 1,50.52 Repair&Maintenance Services-Gas Compressor
81 Fries EBztroars 3.22 Computer Supplies
84475 Disks lncerpmaed 75.20 Salsty Supplies
84479 Gales Fibergless Impotent 1,315.60 Repair&Maintenance Services-Scrubber 10 Air Duci Leak on Caustic Line Inlets at Sandde s 14
84480 George Yardley Ca. 1.144.31 Elemental Pride&Supplies
84481 Goldi mwsst Wed.Service SAWN Groundskeaping Services
84482 Grainger,Imp. 23.45 Mechanical Pens&Supplies
64483 Graybar Electric Company 164.77 Skeptical Repair&Maintenance Services
84484 Guarantee Records Management 1.010.77 OBShe Records Storage
64465 Hach do Pantan Industries 950.84 Lab Pads&Supplies
84486 Hakh&Kirk,Inc 16,086.77 CenGan Spark Plugs&Mechanical Pads&Supplies
84487 Hooter Packard Company 16.239.26 (50)HP Members&Cables ter Safety Related Replacements
U488 Home Depot 1.786.3E Mlec.Repair 8 Maintenance Meterel
84ml Hose Exprass.L.L.C.tlbe Pbtek Sonia Ant 4,574.38 Mobile Haas Service-Replacement of Hoses on Baer Turbine Generator
84490 Hub Auto Supply 04.70 usually Pads&Supplies
U491 We. 1,464.63 Lab Pads is Supplies
844N Impulse 85.8E Instrument Pads is Supplies
8440 In lustral Distribution Group 2.783.09 Mocleanlpl Pads,Supplies,&Tools
84484 Innedinly Engineering 9.616.82 Sewedae Video ImmuspiorM
84495 Inplant Sales,L.L.C. 325.69 Mechanical Pads&Supplies
a"" Intelligence P.Ix 1519.OD Books&Publications
84497 Inversive Systems,Inc. 801.0 Instrument Pads&Supplies
84498 IOMA,Inc. 275.00 Training Supplies
84499 Iron Mountain t00A0 Storage Fee-Bid Documents Pl-37
84500 Ironman Pads If Servos 1.856.44 Mechanical Pads&Supplies
84501 ISEC,Ins 1.376.00 Plumbing Pads&Supplies-Faucets for Lab Ran 227
84502 JG Tucker And San,Inc. 331.73 Repair&Maintenance Services-Wnch,Slalionary Drum Shaft and Recertification
84503 J.B.Bostick Company,line. 8,018.011 Repair&Maintenance Services-Asphalt at Garfield Exit Gate
846N Jamison Engineering Compensate,Inc. 3,900.a8 Repair&Maintenance Services-Pump on Baker-Giealer Air J um per
8450E Jaya Catering 685.21 Missing Eryens rs
84506 JObnamre Supply Rai Electrical Pads&Supplies
8450T Kam Advance MelOriab,Inc. 18,657.92 Endng.Services-Forenate Analysis of Solid Storage&Truck Loading Facility's Cake Transfer Pumps
li Kelly Paper 34.8E Paper
84509 Kforce,Inc 1,716.00 Temporary Employment Services
84610 Kissa Envlronmama Lab 360.00 Outside Laboratory Services
$4511 LBN Image Apparel 1,005.93 Incident Command VesN
94512 Laoyem Title Company 761 Tie Searches-OCSD Trunk Sewers
84513 Louis Allen Wodtlwide 15,000.00 Professional Services-EMT&Manager Training Program
84514 Lucsfs Gourmand Foods,Inc. 94.5E Meaning Expense
H:vN11WPEMCELWVAMPetNPEKLar wenpwtmnnOpmsaw navel-m�ae EXHIBIT B
yea rcep Page 3 of 8 10,18400)
Claims Paid From 09116106In 09I30A18
WamM No. Vendor Amount Description
84SIS Lynda-OMway Company,Inc. 253.75 Equipment Maintenance&Repair Services-Xerox Copier Room Paper 0611
MIS M.J.Schiff and Assonieas.Inc IM0.00 Professional Senhoss-Cormsion Study
84517 Maseschusetts Mutual Life Insurance 145.41 Executive Disability Plan PremWm
84518 Malcolm Pimie.Ian. 20.086.50 Professional Services 11-26
84519 Manpower Prolmsipnal 5.654.00 Temporary Employment Servicas
84520 Mae Cblor,Inc. 1.606.58 Mechanical Paris&Supplies
84521 MCCrometm.Im, 3,385.00 Flow Meter
84522 McMaster Cart Supply Co. 778.33 Mechanicel Pam&Suppled;
84523 MOB Consulting 4.492.80 Professional Survaytng Services 1-24
84524 Medlin Cmmols Co. 622.58 Inetmmenl Pale&Supplies
84525 Mesa Cmealidaled Water District 34.83 Wafer Use
84526 Midway Mfg.&Machining Co. 19.179.50 McNanical Pads,Supplies&Repairs
84527 Mo0m IMustrm.s Inc. 1.038.76 Motor&EbcVipl Pads
84525 Mr.Shims 45T.35 Mechanical Pads&Supplies
84529 Municipal Information Systems 675.00 Meeting Reglslralren-Diemn ate
U530 Neel Supply Co. 163.58 Plumbing Supplies
84531 N.pra Plumbing 13721 Plumbing Paris&Supplies
$4532 Nickey Petroleum Co.,Inc. 1,338.86 Hydraulic Oil
84533 Ninyo&Moore Corporate Accounting 1,11D.W Prolosslmal Services-Soils,Concrete&Other Materiels Testing
84534 NRG Thermal Servrcas,L.L.C. 17.269J0 Mechanical Parts&Supplies&Repairs
84535 Numalro Engineering 189.85 Mechanical Paris&Supplies
84536 O C Tanner Recognition Company 1,463.44 Employee Service Award.Program
M537 OCB Reprographics 10.703.64 Priming Seance-MO 1Q6100
P538 Omega Industrial Supply,Inc. IA34,15 Janitorial Supplies
U539 OrdSounce DistribuXes.Inc 3,604.96 Eroctncel Pad.&Supplies
84540 Orecta Coroomfion 740.50 SoBwsre Update&Support
84MI Orange Fluid System Techmlogies.Im. 4.328.99 Plumbing Pads&Supplies
84542 ORCO Construction Supply 214.12 Marking Paint
84643 Oxygen Service Company 3,669.99 Lao Paola&Supplies
94W Pease Mechanical Supply 208.78 Plumbing Supplies
"us Pacific Supply 56.92 Automotive Pads&Supplies
84548 PCG Industries 1.100.00 Pump Repairs B Maintenance
84547 PL Hawn Company,Inc. 923.95 Electrical Pads&Supplies
84548 Platinum Advipom 5,000.00 Le9leletws Advocacy Efrodn&Padkipation in Legielative Affelns Committee Moo inge
84549 Plumbers Depot,Inc. 848.83 Mechanical Pads&Supplies
84550 Primary Sources Office Furnishings,Inc. 3,619.32 Office Furniture&Mr .Equipment
84551 Panpipe 9,997.31 Sewedine Clashing for City of Tustin&Unincorporated County Property
U552 Pmdentiel Overall Supply 165.05 Uniforms&RW.W Amd.
U553 PS TER,L.L.C. 1.19327 Pump Pads&Supplies
U564 Pudic Raemmes AEvleoy Group BA00.00 Financial AdNegry gammas-June 30,20M Quarterly Swap V9luationB Analysis Repo"
84555 Reinbaw Disposal Co. 3.104.33 Trash Removal
84555 RCIMn Instrument Co.,Inc. 603.50 Lab Pads&Supplies
8455T Restek Corporation 90.75 Lab Paris&Supplies
84555 R.F.M.cDonaid Cc 39.16 Electrical Parts&Supplies
U559 Rmkvmll Standard,&Equipment Co. 3,553.52 Pump&Pump Parts&Supplies
84580 RmmmountAostylkaWnikw 513.00 Instrument Parts&Supplies
84561 RPM Electric Mope 531,21 Moron
U562 RS Hughes Co.,Inc. 88.91 Paint Supplies
84563 RTM Lighting&Electronics,Inc. 1.222.08 Electrical Parts&Supplies
EXHIBIT B
nwepuemuceLcnvaawrswa[10aww Pd4 arpwrmsMdmapm wpwl-waoee
ruirwc Pape 4 of 8 ID1YaXe
Claim,Paid From 0611&a8 to 09130MG
Warrant No. Vendor Amount Description
845" Rutland Tool&Supply 149.74 Task
84585 Safe"re,Inc 538.74 Salary Videos
645M 3ayho0,L.P. 1,390.00 Lab Anslyses
84567 Schanck Trebal 01.92 Instrument Peps&Supplies
64M Send Specially Gases.lns. 60.12 Demurrage
84M Sworn Name Plate 1.051.55 Traffic Signs
84570 Shamrock Supply Co.,Inc. 960.79 Tools&Chinnihe.....
84571 ShaM'dte Instruments,Inc. 1.088.56 Instrument Repair&Calibration Services
64572 Shureluck Sales&Engineering 776.74 Mechanical Pena&Supplies
84573 Siemens do Jensen Instrument Co. 218.98 Instrument Paris It Supplies
84574 Siemens Water TaMnolo9pas Cory. 2.580.06 Service Agreement-DI Water Systems at Plants l&2
84575 SkphPeth Seminars 199.00 Training Registration
54576 Smith Pipe&Supply,Inc. 127.72 Landscape IMgatlon Supplies
84577 South Coast Air Quality Management Dial. 242.32 Permit Fees-Annual Emission,Operation&Misc.Fees
84578 South Coast Air Quality Management Dial, 90.06 Pemit Few-Annual Emission,Operation&Muc Fees
84579 South Coast Apr Quality Management Dial, 154.13 Permit Fees-Annual Emission,Operation&Muc Fees
94580 South Coast Air Quality Management Dial. 336.48 Permit Fees-Annual Emission.Donation&Muc Fees
84581 Southern California Edison 25.23 Power
U582 Southern Celllomia Trans Service 1,044.35 ENCMcal Paris&Supplies
U583 St.Croix Sensory,Inc. 1.080.00 011ecmmetry Testing Samices
$4584 Summit Steel 2.420.61 Metal
84585 Sunset Industrial Pads 8112.37 Mechanical Paris&Supplies
9458E Super Chem Corporation WBAD Chemicals
84687 Technical Sniica Group,Inc 1,381.60 SCAM Sysion VAX Strike Agreement
114588 Terminix International 3,659.00 Put Control
84589 The Orange County Register 235.95 Notices&Ads
84590 Thompson Industrial Supply,Inc. 4,221.52 Mechanical Pads Is Supplies
U591 Tony's Lock&Seta Service&Saks 206.15 Lade&Kays
U592 Tortuga Pool Sim Aces 310.00 Maintenance Agreement-Weekly Cleaning of Atrium Pond
64593 Tpwmend Public Affairs 10,000.00 Legislative&Executive Advocate for Grant Funding
U594 Traffic Control Service,Inc. 323.25 Traffic Safety Supplies
84595 Truck&Auto Supply,Inc. 192.90 Aulomolive Pads&Supplies
64595 Underground S.M.Ali or So.Calif 1,713.60 Membership-Underground Uhler ldonlitcalknMMl9catlon Service
64597 The Unuoudai Corporation 651.77 Office Supplies
84598 United Pacific Services,Inc. 17.952.51 Landscape Maintenance at Plants 1 &2 ant Pump Stations
64599 Unhed Parcel Service 1,137.70 Parcel SeMces
64600 United SWbs Plastic Corp. 24.46 Lab Pads&Supplies
84601 UPS Ground Freight Inc. ROAD Freight Sarvlcae
84602 US Nntic Corp. 525.01 Repair&Maintenance Materials
84603 Vernal Cathedral 79.50 Telephone Somme
84W Viluge Nu forho 54.95 Landscaping Supplies
84605 Viskn S.M.Plan CA 9,574.66 Vision Service Premium
8006 Vortex Cory. 5,720.45 Door Repairs&Installations-Various Location and;Repairs to Traffic Spilow at Front Gate
8007 VV&s Scientific Products 11.697.23 Lab Pad.&Supplies
84608 The Wackenhut Corporation 16,659.79 Secudty Gwms
84609 Water Environment Federation 1,890.75 Lab Pals&Supplies
84910 Made Corporation 4.083.e0 Lab Pent&Supplies&Th icing Registration
84611 Whim Smile,Supply 544,55 Janitorial Supplies
U612 M115 Supply Ca. rS.80 Mechanical Pena&Supplies
N Fed nation-oa.4Yae EXHIBIT B
realm Petri 10'101ypl
Claims Paid From 09116106 to 09130MB
Warrant No. Vendor Amount Deecdpuon
U613 West Lite Supply Company,Inc 6.920.13 Electrical Parts S Supplies
64614 Wilson Supply,Ina 1,877.57 Plumbing Pens B Supplies
84615 XEROX Coryocation 834.96 Pepe,
84616 YeISIChase Materials Handling.Inc. 1,834.12 Electric Can Pans
U617 Nicholas J.Ammntes 128.00 MestingRrsining Expense Reimbursement
U618 Jame,L.Burcr 529.06 Meatng/Trainin,Expense Reimbursement
84619 Volume D.Cm,idy 1315,00 MeeungiTraining Expense Reimbursement
U620 Denny L.Dither 21.00 Mexamered'mg Expense Reimbursement
54621 Michele Farmer 29880 MwtingyTrsininq Expanse Reimbursement
84622 David 0.Helynson 125.00 Meelingyrrsiming Expense Reimbursement
84623 James R.Hams 548.SS Maetin9Rmining Expense Reimbursement
U624 Jamiann M.Quaker 462.74 Meclimgrtmining Expense Reimbursement
84625 George L.Robertson BUSS MealinglTnuming Expense Reimbursement
846M Cdstine J.Stanford 18.00 Meetingarshang fixtures Reimbursement
64627 Enk D.Slrslmoen 90.00 Meeting?mining Expense Reimbursement
84628 Moms C.Yin, 125.00 MestingR,sining Expense Reimbursement
84629 Aquarium 01 The Pacific 14710 Reimbuneble Employee Activity Expense
84630 Matthew CeMm 1,944.33 Empoyee Computer Loan Program
84631 Eugene Roan 485DSS Clem Settlement
84632 Joan Parker-Frey and DWI 2.409.71 Employee Covell.Loan
U633 Orange County Sanitation District 871.69 PeSy Cash Reimb.
846U P.G.8 J.Demolition Services 1.400.00 Clean Settlement
Nast Sir Speedy 1.052.92 Printing Service-Brochures-Drain is Not A Dump
846M Black 6 Veatch CDrpmelion 140,284.17 Engineann9 Services J-79-1
84637 City of Foumaln Valley 43,284.14 Wafer Use
84638 Ecology Control Industries 36.309.37 Hazardous Wass,Disposal
$4639 Margate Cems4uctton,Inc. 138,790.30 Construction JHil
64840 Mike Pdictr&Sons 26,831.00 Construction FE05-20
NMI RBF Consulting 64,308.68 Engineedng Services 747 B 7-32-1
84642 Saracen Engineering.Inc. 40,610.00 Con,lruc0on-Manhole Rehab.Prsjeel 8 Fold 6 Reform PVC PIpalRehab,of Small Die,Sewer Pipe
s4843 Tus,RanchlMagm Farms 59,691.11 Residual,Removal MO 3 29.95
64644 Woodruff Spsa lm 6 Smed 131,485.08 Lagel Services NO 9-26-95
54645 CaliMmb Business Bank 107.382.76 Conetmctian 1-24A,Retention
B46a6 Helix Electric,Inc. 263.236.48 Construction SP411
84647 J R Filanc Construclion 1,037,378.61 Construction P142
84US Mike Buffalo Construction Co.,Inc I,T78.444.88 Construction I-2-4A
54649 Steve P.Raiders.Inc. 191,805.75 Construction 1.24
54050 Union Bank of California 31,470.72 Construction SP21.Retention
84651 American Fidelity Assurance Company 557.40 Empery ice Volumlay Cancer Insurance
54652 American Red Cross 642.00 CPR Training S Miscellaneous Supplies
84653 Arhich Elevator Services 584.98 Elevator RNki
84654 AT B T Universal Bills, 985.25 Telephone Service
84665 AT B T CalibmiaMlCl 2.472.28 Telephone Service
64656 BMC Business Machines Consullants,Inc. 551.56 Repair&Maintenance Service and Parts-Multifunctional Printer
84657 Burke Engineering Co. 2.536.11 Electrical Pans 8 Supplies
84656 City of Huntington Beach 100.00 Chidwn-Discharge of Sediment hum Ph.21nto Bmokhurst Slreel
84659 California Auto Collision 617.73 Repair&Maintenance Services-Danner Door on V495
84660 California Dept,of Child Support 96.02 Village Garnishment
84MI Casual Gourmel 126.82 Mail Expenses
Riarevers,xC[tarernaWvsnwnFnci.em P ri nepwosowaxaspma caceon.oaypoe EXHIBITS
anion i Page 6 of 8 tmeym,e
Claims Paid Fram 0 IMS to OW30MG
Warrant No. Vendor Amount Description
U662 Compressor Components of CMiforn a 4,620.00 Repair&Maintenance Services-(33)LSVB.Pilot Fuel Valves
84663 County of Orange-HeaW Cam Agency 2,724.00 Underground Storage Tank,Hecemqus Materiel,&State Fees
84664 DAC(Digital Aswrance Codification) 1,500.00 Professional Sendai-Dissemination Services&Secured SIM Sulfide Board Posting
84665 DWG Associates 3.312.W Professional Semses-Revises of Cryo Plant Rehabilitation Work-COW Box'A'
54666 Employee Benefits Specialists,Inc. 10,535.15 Reimbursed Propdd Employee Medical&Dependent Cam
54667 En emmental Engineering&Connecting 2,967.50 Professional Somali-Fats,Oil&Grease(FOG)Training
64688 EqunChlor 3,164.27 Hydrochtoric Aad
84669 Court Order 420.00 Wage Garnishment
54670 First American Reel Estate Solutions 450.00 On-Line Orange County Property Information
84671 Fouatin Valley Rancho Hand Wash 1,484.00 Vehicle Washing&We ang Services
84672 Franchise Tax Board 196.95 Wage Garnishment
U673 Golden Bell Products 3.01.00 Commonest Semmes-Insecticide Coating of Marrieds
U674 Goldenwest Wn low Service 00.00 Groundakeeping Seances and Window Washing Services
U675 Green Pend MOOS Meeting Supplies
U676 HealthFax,Inc. 4,074.00 Health Fair-Employee Flu Slats
U677 Home Depot 345.12 Misc.Repair&Maimenance Material
84678 Hopp HnRWIHAC 551.05 Publication-Waitress Newsletters
U679 Inland Peteday m Equipment and Repair,Mc. 1.771.98 Repair&Maintenance SONICes-Replacement of Veeder-Rail Metal Sensor&Spill Bucket
U680 Internal Revenue Seance 125.00 Wage Garnishment
U681 Intl.Union of Open Erg.AFL CIO Local 501 4,494.60 Duke Deduction
84662 Kfcrce,Inc. 1.372.80 Temporary Employment Services
6460 League of CaSMrna Cbies 140.00 Meeting Registration-Dini ISO
646M Count Order ISOM Wage Garnishment
64605 M.J.Schiff and Medical Inc. 15,20aAS Temporary Employment Services
84686 Menisci Professioal 2,976.00 Temporary Employment Services
84687 MCMpsAw Can Supply Co. 238.86 Electrical Pans&Supplies
84686 Mellon Trull 22.517.03 Imestmenl Custodian Bank-Asset Administration Quarterly Fail
B4689 Court Order 225.00 Wage Garnishment
846M National Bond&Trust 2,756.67 U.S.Savings Bonds Payroll Dedudlons
84691 Mohamed Fire Promotion Aaeoclaldn 675.00 Desire&Pudicetions
84692 National Institute of Business Management 48.00 Books&Publications
84693 Niryo&Moors Corporate Accounting 1,206.50 Protesiorel Semoss-Sad,Concrete&Dead Materials Testing-Pt-37
84694 Northers Tool&Equipment Company 2,245.83 Elecricel Pods&Supplies
84695 OCB Reprographics 2,573.68 Printing Semmes-MO 112MO
84696 OCEA 620.03 Dues Deduction
84697 Peace Officers Council of CA 1.548.00 Dues Deduction,Supervdore&Professionals
U698 Pioneer Americas,Ina. 10,237.44 Sudden Hyp chlorits
U699 Paelpuahems,Inc. 9,570.00 Professional Services-WabsiM Redeeign(OCSD.com)
U700 Port Supply 62.99 Monitoring Vessel Pads&Supplies-Nerress
U701 PwPald Legal Services,Ind MISS Employee Voluntary Legal Service Insurance Premium
84702 Ralfesdr Lit Insurance Company a,517.98 Voluntary Lid,Cancer&Supplemental Short-Tartu Disability Insurance
84703 Red W rg Shoes 43A0 Safety Shoes
04704 RPM Electric Motors Hill Mechanical Pans&Supp6ee
84705 RS Hughes Co.,Inc. 1,145.42 Paint Supplies
84706 Smldl Voice&Dell.Inc 2.284.79 Telephone Stephen Maindned.
84707 City of Seel Beech Finance Dept. 309.34 Water Use
U708 Court Order 721.50 Wage Garnishment
U709 Snap-On Tool.,tow. 76.16 Tools
U710 Soffdroicil Carp. 487.24 SOewa e
M WegNveE%CELAeV3bAP$INAE1WMa Pee Repwm907iCLMr Pete RpM-W.pgJ E%H BIT B
antt. Page 7 of 8 andisp'M
Claims Paid From 09116106 to 09130106
YYarmM No. Vendor Ampurd Description
N711 Sparkletts 2.147.14 Drinking WalerlCcoler Rmdala
84712 TekSyaWm3 12.205.50 Temporary Employment Services
84713 The Orange County Register 1.438.80 Notices&Ads
U714 Time Warner Communications 51.07 Cable Servicas
P715 Todd Painting,Inc. 1,050.00 Painting Services
U716 United PanRl Service 94.00 Parcel Services
U717 United Way 60.00 Employee Contributions
U710 US Pemxlde.L.L.C. 13,560.12 Odor&Corrosion Control Treatment for Coll.Sys.,Hydrogen Peroxide&Fermus Chloride
U719 WEF 182.00 Membership-Water EnNommenl Federation
M720 Weal Grou uANest Publishing Center 448.00 Books&Publications
84721 WOWA1W0dr 2.040.00 Training Registration
04722 Xerox Corporation 2,250.73 Cap,.Leases&Managed Services
64723 Court Order 597.5D Wage Garnishment
M724 I-SUD43onference(R) 82.18 Telephone Conference Cells
84725 Flaming Erniromen al.Inc. 7.661.00 Construction FE05J1
M726 Union Bank Of California 21,289.53 Construction l-2<,Retention
84727 Layne T.Bereldi 420.28 Meeting raining Expense Reimbursement
U728 Michael J.Barmlt 196.60 Meeang?reining Expense Reimbursement
84729 Themes M.BlaWe 295.98 Maeting/7nining Expense Reimbursement
847M Deon M.Comoo 63.00 MeetirgRminig EVense Reimbursement
84731 4Mlliam D.Cassidy 353.81 MeeliogRraining Expense Reimbursement
U732 Amoll G.Chavez 190.00 Meetmgamining Expense Reimbursement
84733 James E.Colston 216.60 Meall"IThaning Expense Reimbursement
U734 James M.Elo 64.32 Meetin17huning Expemse Reimbursement
U735 Chuck M.Forman 1,087,65 MeminglTraMing Expense Reimbursement
M736 Char es E.Fray 62.27 Meeting/7raining Expense Reimbursement
84737 Richard Gallegos 553.56 MeetinglTraming Expense Reimbursement
84738 Larry Gibson 875.44 MestingRralning Expense Reimbursement
U739 Charles D.McGee 21.00 Me.tingRraining Emense Reimbursement
84740 Michael D.Moore 401.19 MeetingRraining Expanse Reimbursement
84741 Samuel L.Mowbray 25.00 Meeling/fraining Expense Reimbursement
U742 Jeremy J.Baum 748.64 MeetingRmining F cpense Reimbursement
U743 BanbWge Group,Ix. 3.085.00 Claim Settlement
Total Accounts Payable-Warrants S 21,491,833.51
Payroll Disbursements
34940 - 35015 Employee Paychecks S 139,122.56 Bivmekly Payroll-09R7I06
35016 - 35021 Employee Paychecks 26,002.93 Intanm Patricia-W2W6,9126/06&WB108
131188 - 131742 Direct Depos6 Statements 1,192,686.07 Biweekly PsyroII 09R7/06
Total Payroll Disbursements S 1,358,011.55
Whe TmnaHr Payments
OCSD Payroll Taxes&Contnbuwns & 667,56Z67 Biweekly Payroll 0927M6
US Bank 657,430.21 Series 2000 A&B Refunding COPS September Interest Payment
Total Wire Transfer Payments S 1,344.997.ae
Total Claims Paid 09116m6.0W30418 6 24,184,842.95
X'wgarmEZCELeeVNAaawaDOeime POO R� ono Ped nex,1 dadoo9 EXHIBIT
mot. Peg.6018 10,16AN08
Orange County Sanitation District
MINUTES
BOARD MEETING
September 27, 2006
oJ�� SAAIITgl�O9
gr
c A
O y
AFcr'y HE
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
Minutes for Board Meeting
v 09/27/06
' Page 2
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was held on
September 27, 2006 at 7:00 p.m., in the District's Administrative Offices. Following the Pledge
of Allegiance and invocation the roll was called and the Secretary reported a quorum present as
follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
X James M. Ferryman, Chair Arlene Schafer
X Doug Davert, Vice Chair Tony Kawashima
X Steve Anderson Steve Simonian
X Charles Antos Gordon Shanks
X Don Bankhead Leland Wilson
X Carolyn Cavecche Jon Dumitru
X Alberta Christy Mike Garcia
X Larry Crandall John Collins
X Bill Dalton Mark Rosen
X Michael Duvall Jim Winder
X Norman Eckenrode Constance Underhill
X Richard Freschi Bob Fauteux
A Sukhee Kang Steven Choi
X Phil Luebben Lydia Sondhi
X Patsy Marshall Jim Dow
X Darryl Miller Douglas Reinhart
X Roy Moore John Beauman
A Joy Neugebauer Vivian Kirkpatrick-Pilger
X Ken Parker Catherine Driscoll
X Tod Ridgeway Don Webb
X David Shawver Brian Donahue
X Harry Sidhu Bob Hernandez
X Jim Silva Lou Correa
X Dave Sullivan Debbie Cook
X Mark Waldman Ralph Rodriguez
STAFF MEMBERS PRESENT: Jim Ruth, Interim General Manager; Penny Kyle, Board
Secretary; Nick Arhontes; Bob Ghirelli; Jim Herberg; Dave Ludwin; Patrick Miles; Ed Torres;
Lorenzo Tyner; Lille Kovac; Jeff Reed; Michael Gold; Juanita Skillman; Bret Colson
OTHERS PRESENT: Brad Hogin, General Counsel; Kelly Christensen; Kim Christensen, Thom
Coughran,Art Perry, Paul Frazer, Ben Campbell, Brad Bush, Mark Miller, and Charles Mitchell.
Minutes for Board Meeting
09/27/06 °
Page 3 r
MOVED, SECONDED AND DULY CARRIED: Receive and file minute excerpts from the
following re appointment of active and alternate Directors, as follows:
City/Aaencv Active Director Alternate Director
Orange Carolyn Cavecche Jon Dumitru
PUBLIC COMMENTS
There were no public comments.
REPORT OF THE CHAIR
Chair Ferryman requested Directors to submit their ethics training certificates to the Board
Secretary. He also announced a workshop scheduled for Wednesday, October I on
streamlining Board and Committee functions.
Ed Torres, acting Director of Technical Services, recognized Kim Christiansen for 25 years of
employment with the Sanitation District.
REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, reported on the successful placement of the acting
Assistant General Manager; progress on the joint campus with the Water District; and benefits
consultant study review needed for structure and parameters for labor negotiations. He referred
to the monthly status report for additional information items.
REPORT OF THE GENERAL COUNSEL
General Counsel, Brad Hogin, advised that if the motion for preliminary injunction scheduled for
hearing on October le is not granted, the Kern County ban of biosolids application will be effective
January 1, 2007.
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and "B", attached hereto and made a part of these minutes.
ALL DISTRICTS 08/15/06 08/31/06
Totals $19,628,166.52 $24,509,685.16
Director Cavecche abstained from discussion and voting on Warrant Nos. 83787, 83819, 83976,
83991, and 83913. Director Sidhu abstained from discussion and voting on Warrant Nos.
83354, 83357, 83744, 83991, and 83779. Director Shawver abstained. Abstentions were
pursuant to California Government Code Section 84308.
Minutes for Board Meeting
09/27/06
Page 4
CONSENT CALENDAR
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. MOVED, SECONDED, AND DULY CARRIED: Order the minutes for the regular
meeting held on August 23, 2006, to be filed and deemed approved.
Director Shawver abstained.
b. MOVED, SECONDED, AND DULY CARRIED: (1) Receive and file petition from
Charles J. Walker requesting annexation of 1.988 acres to Orange County
Sanitation District in the vicinity of Brier Lane and Highcliff Drive in an
unincorporated area of Orange County; and,
(2)Adopt Resolution No. OCSD 06-19, authorizing initiation of proceedings to
annex said territory to OCSD (Proposed Annexation No. OCSD 57—Walker
Annexation).
C. MOVED, SECONDED, AND DULY CARRIED: (1) Receive and file petition from
Michael and Virginia Rue requesting annexation of 1.06 acres to Orange County
Sanitation District in the vicinity of Skyline Drive and Reservoir Road in an
unincorporated area of Orange County; and,
(2)Adopt Resolution No. OCSD 06-20, authorizing initiation of proceedings to
annex said territory to OCSD (Proposed Annexation No. OCSD 58—Rue
Annexation).
d. MOVED, SECONDED, AND DULY CARRIED: Adopt Resolution No. OCSD 05-
24, Levying Assessment Installments in lieu of the Payment of Sewer System
Capital Facilities Capacity Charges Incidental to the Connection of Assessor's
Parcel No. 503-301-04 and 502-232-06 to the Sewer System.
END OF CONSENT CALENDAR
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
10. STEERING COMMITTEE
A verbal report was presented by Chair Ferryman re the September 27, 2006 meeting.
Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Steering Committee
Minutes for the meeting held on August 23, 2006, to be filed.
b. Item pulled for discussion
P
Minutes for Board Meeting
09/27/06
Page 5
Non-Consent Calendar
a. Adopt Resolution No. OCSD 06-21, Declaring Support of Proposition 1E.
A motion was made to approve. The motion failed by a vote of 9 ayes and 14
noes.
11. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE(OMTS)
OMTS Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Operations,
Maintenance and Technical Services Committee Minutes for the regular meeting
held on September 6, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: (1) Ratify approval of Amendment
No. 1 to the sole source agreement with UC Riverside for the project titled
`Seasonal Evaluation of Reproductive Status and Exposure to Environmental
Estrogens in Homyhead Turbot at the Municipal Wastewater Outfall of Orange
County, for an additional amount of$50,000 for year two of the contract, for a
total amount not to exceed $100,000; and,
(2)Approve an extension to the contract for year three for said project for an
additional amount of$50,000, for a total amount not to exceed $150,000. .
C. MOVED, SECONDED AND DULY CARRIED: (1)Authorize the General
Manager to accept a $76,098 credit for Trunkline Chemical Treatment Strategy in
the Miller-Holder, Knott and Baker-Gisler Trunklines from U.S. Peroxide, LLC;
and,
(2)Authorize the General Manager to utilize up to$60,100 of the $76,098 credit
for the relocation of the chemical dosing tank to be completed by U.S. Peroxide,
LLC.
d. MOVED, SECONDED AND DULY CARRIED: Approve a Consulting Services
Agreement with TMV Systems Engineering, for Process Control System
Historical Replacement, Specification No. CS-2006-281BD, providing technical
consulting, implementation support and software purchase, in the amount of
$357,902, and a contingency of$17,098 for a total amount not to exceed
$375,000.
e. MOVED, SECONDED AND DULY CARRIED: Authorize the re-appropriation of
$450,000 from Biosolids Production Siting Study, SP-105; Environmental
Compliance Assessment Program, SP-104; and, Odor Control Study,Job No.
P2-95, approved projects in the FY 06-07 CIP, to fund the FY 06-07 Research
Program projects not included in the current CIP.
OMTS Non-Consent Calendar
No items were considered.
Minutes for Board Meeting
09/27/06
Page 6
12. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE
PDC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Planning, Design and
Construction Committee Minutes for the regular meeting held on September 14,
2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Receive and file the Collection
System Strategic Plan Update dated April 2006, prepared by MWH Americas,
Inc. for the Collection System Model and Strategic Plan Update, Job No. J-101.
C. Item removed.
d. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No.1 to
Plant No. 2, Utility Corridor, Parking and Pump Station for Contractor Staging,
Job No. P2-66-3, with Denboer Engineering and Construction, Inc., authorizing
an addition of$37,762 and 159 calendar days, increasing the total contract
amount to $1,360,762; and (2)Accept Plant 2, Utility Corridor, Parking and Pump
Station for Contractor Staging, Job No. P2-66-3, as complete, authorizing
execution of the Notice of Completion and approving the Final Closeout
Agreement.
e. MOVED, SECONDED AND DULY CARRIED: (1)Approve plans and
specifications for 66-Inch Ellis Avenue Trunk Sewer, Contract No. 1-10A, on file at
the office of the Board Secretary;
(2)Approve Addenda Nos. 1, 2, 3, 4, and 5 to the plans and specifications;
(3) Receive and file bid tabulation and recommendation; and
(4)Award a construction contract to Barnard Soletanche, a joint venture, for
66-Inch Ellis Avenue Trunk Sewer Contract No. 1-10A, for an amount not to
exceed $32,232,600.
f. MOVED, SECONDED AND DULY CARRIED: 1) Ratify Change Order No. 4 to
Plant Utilities Rehabilitation and Refurbishment, Job No. 132-82, with Olsson
Construction, authorizing an addition of$1,040, and an additional 457 calendar
days, increasing the total contact amount to $2,883,385; and,
(2)Accept Plant Utilities Rehabilitation and Refurbishment, Job No. P2-82, as
complete, authorizing execution of the Notice of Completion and approving the
Final Closeout Agreement.
Minutes for Board Meeting
09/27/06
Page 7 r
g. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 10 to
Secondary Treatment Facilities Process Upgrades at Plant No. 2, Job No. P2-
47-3, with Morrow-Meadows Corporation, authorizing an addition of$295,560,
increasing the total contract amount to $7,640,167.
Director Cavecche abstained.
In. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No. 1 to
Sunflower Interceptor Manhole Rehabilitation, Contract No. 7-21, with Sancon
Engineering, Inc., authorizing an addition of$583,821, increasing the total
contract amount to $2,103,021, and 79 additional calendar days; and,
(2)Approve a budget amendment for Sunflower Interceptor Manhole
Rehabilitation, Job No. 7-21, in the amount of$278,000, for a total budget of
$3,572,000.
i. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 2 to
Rehabilitation of the14"' Street Pump Station, Contract No. 5-51, and
Rehabilitation of the"A" Street Pump Station, Contract No. 5-52, with Kiewit
Pacific Company, authorizing an addition of$256,079 and 14 calendar days,
increasing the total contract amount to$12,095,223.
j. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No. 11 to
Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill North Trunk Improvements,
Contract No. 7-41; and City of Tustin Project Nos.6106 and 6151, with ARB,
Inc., authorizing an addition of$400,676, increasing the total contract amount to
$22,003,110; .
(2) Decrease Phase 4 of Contract No. 7-41 budget by$1,300,000 for a total
project budget amount of$15,460,857; and,
(3) Increase Phase 4 of Contract No. 7-36 budget amount by$1,300,000 for a
total project budget amount of$8,357,433.
k. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 28 to
Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37,with Margate
Construction, authorizing an addition of$83,637, increasing the total contract
amount to $72,760,157.
I. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 20 to
Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4,with Steve P. Rados, Inc.,
authorizing an addition of$151,375, increasing the total contract amount to
$30,679,877.
M. MOVED, SECONDED AND DULY CARRIED: Approve a Professional Design
Services Agreement with The Austin Company to prepare a Feasibility Study for
Laboratory Refurbishment at Plant No. 1, Job No. J-97, for an amount not to
exceed $122,400.
Minutes for Board Meeting
09/27/06
Page 8
n. MOVED, SECONDED AND DULY CARRIED: (1)Approve Amendment No. 5 to
the Professional Services Agreement with Camp, Dresser, & McKee for
Rehabilitation of Odor Control Facilities,Job No. J-71-8, providing for an
adjustment to the burdened labor rates for an additional amount of$109,668,
increasing the total amount not to exceed $5,028,372.
o. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 8 to the
Professional Service Agreement with Tran Consulting Engineers for additional
construction support services for Sunflower Interceptor Manhole Rehabilitation,
Contract No. 7-21, for an additional amount of$7,625, increasing the total
amount not to exceed $1,270,697.
p. MOVED, SECONDED AND DULY CARRIED: Approve a Settlement Agreement
with Parsons Engineering Science for Area Classification Study Implementation
Plan, Plant Nos. 1 and 2,Job No. J-35-2, for a reimbursement amount of
$610,667. MOVED, SECONDED AND DULY CARRIED: Order draft Planning,
Design and Construction Committee Minutes for the regular meeting held on
August 3, 2006, to be filed.
PDC Non-Consent Calendar
No items were considered.
13. FINANCE ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHRI
FAHR Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Finance,
Administration and Human Resources Committee Minutes for the meeting held
on September 13, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. 06-22,
amending Resolution No. OCSD 98-33, amending Human Resources Policies
and Procedures Manual.
C. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. OCSD 06-
23, Adoption of District's 2006 Conflict of Interest Code, and Repealing
Resolution No. OCSD 04-24.
d. MOVED, SECONDED AND DULY CARRIED: Receive and file report of General
Manager approved purchases in amounts exceeding $50,000 in accordance with
Board purchasing policies.
e. MOVED, SECONDED AND DULY CARRIED: Receive and file the FY 2005-06
Quarterly Financial Report for the period ended June 30, 2006.
f. MOVED, SECONDED AND DULY CARRIED: Approve revisions to SAFETY-
POL-101, Injury and Illness Prevention Program Policy, as provided for in
Resolution No. OCSD 02-5 regarding the District's Injury and Illness Prevention
Program.
Minutes for Board Meeting
09/27/06
Page 9
FAHR Non-Consent Calendar
No items were considered.
14. LEGISLATIVE AFFAIRS COMMITTEE
Legislative Affairs Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Legislative Affairs
Committee Minutes for the meeting held on September 12, 2006 to be filed.
Legislative Affairs Non-Consent Calendar
No items were considered.
15. GWR SYSTEM STEERING COMMITTEE (GWRSSC)
GWRSSC Consent Calendar
_ a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Steering Committee Minutes for the meeting held on
September 11, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Approve a Professional Services
Agreement with Faubel Public Affairs for one year of outreach support services
for the Groundwater Replenishment System, Job No. J-36, for an amount not to
exceed $255,850 to be cost shared equally(OCSD's portion $127,925)with the
Orange County Water District.
GWRSSC Non-Consent Calendar
No items were considered.
16. There was no closed session.
ADJOURNMENT: The Chair declared the meeting adjourned at 7:30 p.m.
Penny Wkyle
Secretary to the Bdz of Directors of
Orange County Sanitation District
H:Weptyno115U1511BSVAnutw%092706 DRAFT m nutes.Ex
Claims Paid From 08101106 to 08HNGS
Shemnl No. Vendor Amount Description
Accounts Payable-Warrenb
83237 BloMeneux Vitek,Inc. S 64,650.00 Instrument Pads&Supplies
83238 Block&Veatch Corporation 498.964.07 Engineering Services Pl-76&P1.102
83230 City of Fountain Valley 35.662.13 Water Use
83240 Proplpe 21258.65 SeweAne Woo Inspections
83241 Southern California Edison 225,311.38 Pmm,
83242 US Peroxide,L.L.C. 75,16676 Odor&Corrosion Control Treatrnerd for Coll.Sys.;Hydrogen Peroxide&Ferrous Chloride
83243 J R Flan Construction 2.376.151.90 Construction Pi-82&Pt-76
83244 ChrBn and Cecda 62.754.28 Clear Settlement
83245 Carlin and Cecda Trust 67245.72 Claim Settlement
83246 LA Chemical 1.548.37 Bleach
83247 A-1 Enterprises,Inc. 1.408.00 Fencing
83248 Angles Safey.Inc. 725.05 Safety Supplies
83249 Amencen Fidelity Assurance Company 578.80 Employee Voluntary Cancer Insurance
83250 ASCE Conlinuing Education 085.00 Training Reglstralkin
M251 ABBE Amedcen Society of Safety Engineers 140.00 Membership
83252 AssurX,Inc. 5,513.00 SaTyare Maintenance&Support-CATSWEB
U253 AT&T Universal Biller 1,448.52 Telephone Service
0254 American Telephone&Telegraph Corp. 465.61 Telephone Service
83255 BEC-Bullding Electronic Controls,Inc. 931.30 Fire Al..System Maintenance
83255 Bell Pipe&Supply Co. 518.38 Mechanical Pads&Supplies
83257 Court Trustee 9aA2 Wage Gamishment
83258 California Hazardous Services,Inc. 1,600.00 Underground Stu age Tank Testing
83259 California Relocation Services,Inc. 262.50 OMce Files Moving/Relocation Services
83260 Cingulor Wireloss Aimme 394.57 Wireless Services
83261 Cdyof Tustin 1,031.30 Water Use
83262 Click Tracks Anaytla,Inc. 7,034.00 Maintenance&Suwon-Sronza Server
83263 Columbia Analytical Services,Inc. 16,464.00 Analysis of Wastewater,Industrial Wastewater&BlosolWs
83264 Compressor Components of California 19,837.69 Maintenance&Repair Services-Cooper Compressor&LSVB Ignition Coils
83265 Corporate Express 2.367.86 Office Supplies
83266 Cross Current Corporation 1,2110.00 Professional Servloes-Nelwork Penetration Tooling
83267 CWEA Annual Conference 125.00 Training Registration(California Water Environment Association)
83268 CWEA Membership 235.00 Membership&Training Registration(Cold.Water Environment Assoc.)
03260 Dun Grayson,PSJ3.,Consulting 9,455.T2 Professional Services-OCSD&IT Management Peeress
$3270 Ecolo0y Contml Industries 12,099.37 Hazardous Waste Disposal
83271 Electra Bond,Inc. 1,578.54 Repair&Maintenance Services-Fusion Bond Coating of Pump Parts
83272 Electrical Reliability Services 7,084.00 Professional Services-Electrical Reliability Testing for Capital Projects
83273 Employee Benefits Specialist,Inc. 10,394.99 Reimbursed Prepaitl Employee Medical&Dependent Cam
83274 EquipCo 366.47 Instrument Most,
83275 Court Order 420.00 Wage Gamshment
83276 Fedex Corporation 376M Freight Services
83277 Firsl American Reel Estate Solutions 450.00 Online Orange County Property Information
83278 Fountain Valley Rancho Hand Wash 1.099.99 Vehicle Washing&Waxing Services
83279 Franchise Tax Sued 134.94 Wage Garnishment
832N Gomm!Daniel Woddwide 82.45 Mechanical Pads&Supplies
63281 Goldenwest Wndme Service 1.680.00 Groundskeeping Services
83282 Guarantee Records Management 286.30 Off-Site Remm Storage
83283 Hill's Boal Service 624.44 Engine Oil Change Service-Ocean Monitoring Vessel Nedssa
83284 Home Depot 6.87 Misc.Repair&Maintenance Metals]
H WsprlaWE%CEL,ae1tNAParWiEV.'Wmr Pad Rydda6aTGkem Pod paper-%A&N EXHIBITA
nx2IMc Page 1 of 8 Warsaw
Claims Paid From 08101106 to 08116106
Warrant No. Vendor Amount Dianiptlon
832M Hub Auk,Supply 401.82 Vehicle Pads&Supplies
83286 Hunted Caotal Institute,Inc. 199.00 Membership
83287 City of Huntington Beach 16,706.75 Water Use
83288 Industrial Metal Supply 2,148.05 Metal
83289 Innedine Engineering 4,541.08 Sewerline Video Inspections
83290 Informal Revenue Service 125.00 Wage Gamishment
83291 Intl.Union of Open.Eng.AFL CIO Local 501 4.449.78 Dues Deduction
83292 IN Gremmmoth.Inc. 16,410.00 NT Server Maintenance-Silver
83293 Iron Mountain 100.00 Storage Fee-Bid Documents P1.37
83294 Keith Boger 990.00 Training Registration
83295 Kaye Productivity Center 199.00 Training Regotralbn
83296 Konnie Kim Fine Ad 233.82 Future Framing Service
83297 Llebed Cassidy 8.200.50 Professional Service-Human Resources
83298 Court Order 150.00 Wage Gamishment
83299 Lomian Education Services 578.00 Training Registration
83300 M.J.Stldft and Associates,Inc. 1,250.00 Professional Services-Current Testing&Reporting
83301 Maintenance Technology Corp. 1.097.23 Mechanical Paris&Supplies
83302 Malcolm Ptmie,Inc. 9,463.43 Professional Services,I-24
83303 MBC Applied Environmental Sciences 2,957.21 Aerial Survey of Kelp Beds-Newport Harbor Entrance to Ventura County
83304 McMaster Can Supply Go. 1,471.89 Mechanical Pads&Supplies
83305 Mesa Consolidated Water District 17.91 Water Use
83306 Midway Mfg.B Machining Co. 2,709.75 Repair&Maintenance Services-Impeller
83307 MK Ek,cMc,Inc. 13,600.01) Consiroctlon FE0542&FE0540
83308 Court Oder 225.00 Wage Garnishment
83309 Municipal Information Systems 125.00 Application Fee-Exc4lferK,e In Inform ion Technology Practices Certification Program
83310 Municipal Water District or O.C. 5,255.00 OCSD Share of Housing!Mitigation Plan&Meeting Re0istration-Division 610
W311 National Band&Trost 1,980.28 U.S.Savings Bonds Payroll Dedudlons
83312 OCEA 50.28 Dues Deduction
83313 Omcm Corpore8on 10,218.74 Software Maintenance-Internet Developer Suits
83314 OMen Service Company 235.20 Specialty Gases
83315 Fader Supply Company 797.42 Mechanical Pads&Supplies
83316 Peace Officers Coundl of CA 1,521.00 Dues Deduction,SUPervLSOM&Professionals
0317 Primary Source Office Furnishings.Inc. 10,34D.N Ofice Furniture&Fi dures.Installation&Office Recon69urelion Services
83318 Project Management Institute 154A0 Membership
83319 Quest SOfvare 2.95524 Softeners Maintenance
83320 Red Wing Shoes 139.64 Safety Shoes
83321 RPM Electric Motors 1.419.07 Matra
83322 Scott Specialty Gases,Inc. WAS Cylinder Rentals&Demurrage
83323 ScoBel Voice&Data,Inc. 2,284.79 Telephone System Maintenance
83324 SWIIPath Seminars 199.00 Training Registration
33325 Count Order 721.50 Wage Garnishment
83326 Southern California Edison 33.64 Power
83327 Sparkfe0s 1,758.41 Drinking WatedCooier Rentals
83328 Standard and Poms Corp. 5.000.00 COP Contract Service
83329 Summit Steel 1.270.27 Metal
83330 Terminus International 850.00 Past Control
83331 Thermo Efeclron NOM America,L.L.C. 2249.65 Lab Pads&Supplies
83332 Thompson Industrial Supply,Inc. 8,703.64 Mechanical Pads&Supplies
83M3 Time VJamer Communication 51.07 Cable Services
H W4nn AUCEL E1a12]DuWSR0VdMWme Pek RegM6aM'Ivuna Pot Repon-0&rea9 EXHIBIT A
Fro 10s, Page 2 of 8 wimpm
Claim Paid From 08101ro6 to olg15106
Warrant No. Vendor Amount Deacriplion
83334 UC Regents 1.200.00 Tratrlirg Registration
83335 United Parcel Service 27.19 Parcel Services
83336 Untied States Postal Service 5.000.00 Postage
83337 United Way 160.00 Employee Contributions
$3338 Xerox Corporation 21,024.88 Xerox Phase,Printer,Maintenance&Cog Per Copy Expenses
83339 Court Order 597.50 Wage Garnishment
83340 Zi nmerman Yacht Maintenance 201.00 Repair&Maintenance Service-Ocean Monitoring Vessel Nerissa
83341 James E.Colston 336.99 MeetingfrialnNg Expense Reimbursement
83342 Una Kovac 6.76 MeetingRreimng Expense Reimbursement
83343 Cann O.Nguyen 683.05 Meming/Training Expense Reimbursement
83344 Fred J.O'Brien N.52 Meeting7rmining Expense Reimbursement
83345 Edmund L.Pendleton 106.00 Meefing7rrelning Expense Reimbursement
83W George L.Robertsen 170.00 MeetingiTralning Expense Reimbursement
83347 Henry R.Salgado 43.56 MeetlaglTretning Expense Reimbursement
83348 Alexander Sheehan 558.16 MeeWgRratning Expense Reimbursement
83349 John W.Swindler 217.56 Mee0oglTrolning Expense Reimbursement
8335D Robert J.Thieste 38.56 MeetingRreining Expense Relmbursemant
83351 Waller W.Williams 48.00 MeathlgRraintng Expanse Reimbursement
83352 Ken H.Worg 53.00 MeetingrTraining Expense Reimbursement
83353 City of Fountain Valley 220.00 Encroachment Permit Re Relocation of Ph,i Garfield Ave.Entrance
833U Disneyland Resourt-Group Tickets 2.325.00 Reimbursed Employee Activities
83355 Employee Ac0vlly Committee 10,000.00 Service Award Expense-06/07
BM56 Basic Chemical Solutions.L.L.C. 31,319.84 Sodium though,&Sodium Hydroxide
83357 Black&Veatch Corporaton 175,106.28 Engineering Services Pt-76,J-77&J-79-1
SM58 Blue Chose of California 406,231.50 Medical Insurance Premium
83359 Brown&Caldwell 800,827.33 Professional Services P2-91,P137.132-90,and Notices&Ads
83MO Cardillo Engineers 235,625.47 Professional Services P2416&Pf-71
83361 Ones Dental 57.942.52 Denfet Insurance Plan
83362 Earth Tech,Inc 34,205.27 Professional Services P2-79&Pi-106
83363 G11D.L.L.C. 42,361.90 Professional Services-Asset Management Program
83364 HIn BmNers 35,064.56 Chemicals-Odor&Conaston Control-Newport Tmnkliine
83365 IPMC do Parsons 1.291.094.00 Engineering Services-Integrated Program/Project Management,Temporary Staffing,Marl.&Supplies
83366 Kaiser Foundation Health Plan 67.015.58 Medical Insurance Premium
83W7 Kemimn Companies,Inc. 199.428.14 Fento Chloride
83368 Lee&Its,Inc. 158,397.60 Professional Services 549,550.P2473
83369 MDS Consulting 39,280.80 Professional Surveying Services 1.24
83370 NALCO Company 32,080.83 Anionic Polymer
83371 Occidental Energy Marketing,Inc. 85.715.20 Natural Gas for CenGehfCOGen
83372 Pioneer Americas.Inc. 261.075.05 Sodium Hypochlonte
83373 Polydyne,Inc. 64,995.13 Cauonic Polymer MO 3-11�
M374 RMS Engineering&Design,Inc 25.771.45 Engineering Services-Evaluation of North County Property Acquisition
83375 Southern California Edison 106.558.87 Power
83376 Synagm West,Inc. 320,989.48 Residual.Removal MO 3-29-95
83377 Tule RancluMagan Farms 247.521.25 Residuals Removal MO 3-2945
83378 US Peroxide.L.L.C. 183,916.D5 Odor&Corrosion Control Treahnent he con.Sys.;Hydrogen Peroxide&Famous Chlodde
83378 Waters Carporellon 229.871.59 Lab Instrument-Liquid Chromatograph Triple Quadrupole Mass Spectrometer&Training
83380 WbodmO Spredfin&Smart 117,161.29 Legal Services MO 7-26-95
83381 Workforce Software,Inc. 37,39340 Professional Services-J-104
83382 ARB,Inc 611,107.45 Construction 7-36is 741
H WproutN%CELEIN]3NUSHARMCIa.Paid fwux� Cla..PaW of Pori-08-ISOS EXHIBITA
MQIa'R Page 3 of 8 shm"
Claim Paid From 08101106 to 08116106
Warrant No. Vendor Amount Description
53383 Klewil Pacific Co. 285.477.30 Construction 5-51&5-52
53384 Steve P.Ratios,Inc. 1,100,134.80 Construction 1.24
83385 Union Bank of California 32,163.55 Construction 741&7-36,Retention
83386 Union Bank of California 123.237.20 Construction k24,Retention
83367 Welk Fargo Bank Mac C7300-012 31,719.70 Construction 5-51&5.52.Retention
83388 Chicago This Company 150.000.00 Escrow Installment for Garden Grove Property Purchase
83389 A It G Electropolish 3.822.97 badminton Pans&Supplies
83390 A W Chesterton 544.30 Mechanical Parts&Supplies
83391 A-1 Enterprises.Inc. 774.00 Fencing
a3392 Absolute Standards,Inc. 538.00 Lab Paris&Supplies
a3393 ACS Hydraulics,Inc. 497.92 Muter Repairs
83394 Advance Business Graphics 552.79 Printing Services-No.10 Envelopes w&ogo
83385 AETC 3,406.53 Instrument Paris&Supplies(Advance Engine Technology Corp.)
83388 Agilent Technologies,Inc. 601.90 Lab Pans&Supplies
83397 Airgas Safety,Inc. 3.574.83 Safety Supplies
83398 American Airlines 1,485.40 Travel Services
83399 AMPSAbundant 1,948.50 Instrument Pens B Supplies
83400 Amason Elevator Services 1,400.00 Monthly Elevator Maintenance at Pits.1&2
83401 Apak Batteries 1,050.51 Battery Pecks
8NO2 Applied Industrial Technology 185.35 Mechanical Pans&Supplies
83403 Aquarium Doctor 116.21 Human Resources Aquarium Service
834N Ashbrook Corporation 6.305.82 Wlnkiepress Paris&Supplies
83405 AT&T Callorn"Cl 3752 Telephone Service
BUGS ATCC 6720 Lab Pens&Supplies(American Type Culture Collection)
83407 Awards&Trophies Company 09.82 Awards&Trophies
834DB Barrel Accessories and Supply Company 51.45 Valves
83409 Battery Specialties 282.39 Students
83410 Bee Man Pest Control,Inc. 425.00 Post Control
83411 BloNtedeu%Vltek.Inc. 578.57 Lab Pads B Supplies
SM12 Bldquip Products 1,591.85 Storage Cabinet.Console&Inserts for tab Vials
83413 BOC Edwards,Inc. 51.31 Lab Pans&Supplies
83414 eomemann Pumps,Inc. 8,464.84 Pumps
83415 Burlington Safety Laboratory of CA,Inc. 571.50 Safety Tasting&Recerilfiallon of Hot Gloves-Div.880
83415 California Auto Collision 1.904.73 Vehicle Repair B Repainting-V430
83417 California Relocation Services,Inc. 112.50 Office Fifes MovinglReloation Services
83418 CASA 11,200.00 2006 Litigation Pledge&Meeting Registration-Division 110
83419 City of Huntington Beach 2,841.00 Coastal Development Permit
83420 CLE International 495A0 Training Registration
83421 Cobs Penner Instrument Co. 334.36 Lab Pans&Supplies
83422 CompEd Solulkins 199.00 Training Registration
83423 Consolidated Elect Distributors.Inc. 509.48 Electrical Park&Supplies
83424 Consumers Pipe&Supply Co. 1.139.31 Plumbing Pans It Supplies
83425 Control Factors Seattle,Inc. 1,040.00 Fiber
SM26 Committed Motion Solutions 82.85 Pump
83427 Corporate Eapress 5.807.06 OMa Supplies
63428 Crane Veyor Coop. 3.122.32 Maintenance Agreement-Qiny.Inspections,Certification&Quadrennial Testing
83429 Computational Systems,Inc.(CS0 276.82 Repair B Maintenance Material
83430 D.R.McNally&Associates 1,195.00 Training Registration
83431 DAE Instruments 631.46 Eleclnal Paris&Supplies
N 1aep1YWE%LELdIaV3PAP6NARE1CYima Paid Napcna6UT I.—Peld Raton-0&15U5 EXHIBITA
fm216ID Page 4 of 8 anto. �,
Claim Paid From 08ill to 08115106
Warrant No. VaMor Amount _Description
SU32 Dapper Tire Co. 2,670.86 Truck Time
83433 Davids Tree Service 1,825.00 Tree Maint.Service
83434 Dozen Pumps&Pads,Inc. 12,991A3 Pump Pads&Supplies
83435 De2u lk Water Commit 1.199.04 Mechanical Pads&Supplies
83438 Dionex Corporation 644.55 Lab Pads&Supplies
83437 Diskeeper Committed 1.107.60 Scam.Malnlenance-VAX&VMS
83438 Dunn Edwards Corparatlon 159.94 Paint Supplies
83438 Easy Frame Sign Company,Inc. 2,965.82 Signs&EMS Decals with Logos
83440 Electrical Reliability Services 6,802.00 Professional Services-Electrical Reliability Testing for Capital Projects
83441 Employers Group 825.00 OnSts Training-Note Taking Training
83442 Enchanter,Inc. 3,000.00 Ocean Monitoring&Outran Inspection&Maintenance
83443 Environmental Resource Association 2,34Q05 Lab Pads&Supplies
83444 Environmental Science Associate(ESA) 18,236.60 Professional Services 5.58&1.24
83445 Ewing Inigation Industrial 287.66 Landscape Initiation Pads&Supplies
83446 FEDEX Corporation 118.29 Freight Services
83447 Ferguson Enlerorises,Inc. 916.22 Values
BU48 Fisher Scientific 15.671.03 Lab Pads&Supplies
83449 Flat&Vedkal,Inc. 220.50 Co.Drilling
83450 Franklin Covey 422A8 Office Supplies
83451 Fuller Track Accessories 2.127.04 Track Pads&Supplies
B34S2 City of Fullerton 205.93 Water Use
63453 Garland Manufacturing Co. 8,316.00 Mechanical Pads&Supplies-Treatment Tank Wear Rails
63454 Garratt Callahan Company 11.618.32 Chemicals
83435 Gates Fiberglass Installers 4,909.25 Removal and Replacement of Fibemlass Bleat Damper
83456 Geometrix Consultants,Inc. 3,965.00 Salle.Concrete&Other Materials Testing
83457 Gledkh-Mitchell,Inc. 14,834.11 Mechanical Pads&Supplies
83458 Glendale Adventist Occupational 20.025.00 On-Site Medical Services-Audiometric Testing
83459 Government Finance OMcars Association 55.00 Books&Publications
83460 Grainger,Inc. 1,137.00 Mechanical Pads&Supplies
83461 Orden Pauo1 114.43 Meeting Supplies
83462 GTSI Corporallon 9,757.05 (3)Computers&HardwarelSo6wara
83483 Hach c/o Ponied Industries 14.41 lab Paris&Supplies
83484 Hanington Indusldal Plastics.Inc. 1.783.14 Mechanical Pads&Supplies
83465 Hatch&Kbk,Inc. 2.497.78 Mechanical Pads&Supplies
83466 HOR Engineering,Inc. 7,965.00 Professional Services P242
83467 Hewlett Packard Company 312,18 Computer Hardware/Software-(2)HP JeNurecl Cards
BU68 Home Depot 1.046.26 Mlsc.Repair&Maintenance Material
83469 Hose Express,L.L.C.dba Pidek Santa Ana 3.997.38 Mobile Hose Service
83470 Idexx 2.672.20 Lab Pads&Supplies
SM71 Industrial Distribution Gmup 909.73 Mechanical Pads,Tools&Paint
BU72 Innarine Engineering 16,616.30 Sewers Video Inspections
83473 Implied Sales,L.L.C. 2,637.34 Mechanical Parts&Supplies
83474 Ironman Pads&Services 195.24 Mechanical Pads&Supplies
83475 JG Tucker And San,Inc. 810.08 Traft Road Cones
83475 Jamison Engineering Connectors,Inc. 4.852.00 Remove8teplace Manhole Covers for CCTV Contractor inspection of Intendant Lines
83477 Jays Catering 2.840.29 Meeting Expenses
83478 JEM Industries 3,3W.00 Repair&Maintenance Services-Fueling System at Pit,2
83479 Johnstone Supply 930.09 Mechanical Paris&Supplies
BUBO Keith Batter 395.00 Training Registraled
RWepaaraE%CEL.41a172aAP9HMEKldma Pea ReppMOeo7Klwms PRO seen-M16ea EXHIBITA
r v/tax Page 5 of 8 w'..
Claims Paid From 08/(11108 W 08116106
Warren N. Vendor Amount Description
83481 Korn,Inc. 2.402.40 Temporary Employment Services
83482 Kissel Environmental Lob 360.00 Glade Laboratory Services
83483 Klainfeloer.Inc. 3,323.00 Soils,Concrete&Other Materials Testing 6.52&244A
834M L&N Image Apparel 49.18 OCSD MuJimeaker-w&ogo&"SenriW Leftering
83485 London Education Services 299.00 Training Registration
$3486 Lucci's Gourmet Foods,Inc. 407.0 Meeting Expense
BU87 Massachusetts Mutual We Insurance 145.41 Executive Disability Plan Premium
BU88 Maintenance Superintendents Assoc. 95.00 Membership
83489 Malcolm Pals.Inc. 14244.22 Professional Services 1.24
83490 Manpower Professional 3,875.00 Temporary Employment Services
83491 Matheson Tfl Gas,Inc. 158.42 Lab Paris&Supplies
83482 MBC Applied Environmental Sciences 3,191.34 Aerial Survey of Kelp Beds-Newport Harbor Entrance to Ventura County
SU93 MC Junkin Corp. 55.43 Plumbing Supplies
83404 McMaster Can Supply Co. 2.050.90 Mechanical Pads&Supplies
83485 Medfin Controls Go. 341.92 Instrument Pads&Supplies
83496 MM West Associates 407.51 Pump Palo&Supplies
SU97 Mine Safety Appliances Company 319.74 Calibration Services
83498 Mooring Systems,Inc. 2,748.00 Open Tripod for Mooring Program
BUIN) MM Americas,Inc. 14.103.87 Professional Services P2-74
83500 National Institute of Standards&Technology 658.00 Lab Palo&Supplies
83501 National Plant Services,Inc. 3,920.00 Vacuum Truck Services
83502 Neal Supply Co. 26.71 Plumbing Supplies
83503 New Horizons.C.L.C.of Santa Ana 3,500A0 Training Registration
835N Newel Communicettons 910.01 Cellular Phones&Air Time
83505 NRG Thermal Services,L.L.C. 794.55 Mechanical Pads&Supplies
83506 Num ix,Engineering-Result 196.66 Mechanical Palo&Supplies
83507 OCB Reprogrephlce 248.09 Printing Service-MO 1I26100
83508 Office Depot Business Services Division 4,852.82 Office Supplies
83509 Olympus America,Inc. 1,377.74 Replacement Lena for Moonscape
83510 Omega Industrial Supply,Inc. 1,134.16 Janitorial Supplies
83511 OMNI Wealem Incorporated 34.70 Hardware
83512 Orange County Water District 522.10 Meeting Expense
83513 Orange Courier 132.48 Gouda,Services
83514 Orange Fluid System Technologies,Inc. 1,376.112 Plumbing Pads&Supplies
83515 Oxygen Service Company 1,455.90 Lab Pads&Supplies
83516 Pacific Mechanical Supply 252.95 Plumbing Pads&Supplies
83517 PakSlgr 681.50 Meeting&Travel Registrations-GWRS Project-Division 110
836M PCG Industries 145.00 Repair&Maintenance Services-Gearbox Shaft
83519 PCS Express,Inc. 411.85 Courier Service
83520 PerMUElmaf Las 366.00 Lab Palo&Supplies
M21 PL Hawn Company,Inc. 4,129.04 Electdnl Pads&Supplies
83522 Plumbers Depot,Inc. 3,195.67 Mechanical Paris&Supplies
83623 Pad Supply 13.78 Monitoring Vessel Pads&Supplies-Nerissa
83524 Plush.Inc. 54.04 Lab Paris&Supplies
83525 Primary Source Office Furnishings.Inc. 5,163.89 Office Furniture&Fixtures,Installation&Office Reconfiguration Services
83526 Project Management Institute 119.00 Membership
83527 Proplpe 4,671.58 Sewerine Cleaning-Cly of Tustin&Unincorporated County Pmpedy
83528 Prudential Ouersll Supply 5,929.0 Uniforms&Related Articles
83529 R L Abbott&Associates 3,000.00 Kern County Blosofids Consulting Services
H bepNeNE%CEL.dahl2NPSHAREIC'alma Pad Repro ACP-Pad Repon-Oafaaa EXHIBITA
swznwc Page 6 of wimose- er
Claims Paid From OOM1106 to 08116M6
Warrant No. Vendor Amount Description
U530 Remote Trends.Inc. 4.000.00 Professional Services-Biosofids EMS Values Study&Reporting
83531 Rii Corp. 274.08 Lab Pads&Supplies
83532 Rockhulsl College Continuing Education 179.00 Training Registration
83533 Royale Ceaners 6.00 Dry Cleaning Services
83534 RPM Electric Motors 4,6/5.05 Motor B Moth Repairs
83535 RSA Buller Soil Produce 1.540.83 hoe Materials
83536 Rutland Tool&Supply 148.51 Mechanical Parts&Tools
83537 Solt If Pent Laboratory,Inc 972.50 Sal Sample Analysis
53538 Saery-Kleen 485.95 Pam,Washer Lease,&Service
83539 Sancen Engineering,Inc. 14.205.00 Construction-Manhole Rehabilitation Project
83540 Santa Ana River Flood Protection Agency 1.200.00 FY 2006417 Membership
83541 Schneider Automation.Inc. 51828 Computer Maintenance Agreement
83542 Sea Coast Designs,Inc. 714.38 Lab Pads&Supplies
83543 City of Seel Beach Finance Dept 279.54 Water Use
83544 SETAC 820.00 Membership If Training Registration
83545 Send Name Plate 397.N Outdoor Safety Minor
83546 Sigma Aldrich.Inc. 42.91 Lab Paris&Supplies
83647 Smith Emery Company 230.00 Soils,Concrete If Other Materiels Testing 1.24
83548 Smith Pipe B Supply,Inc. 65.17 Landscape Inigaum Supplies
83549 Southwest Valve&Equipment 1.743.32 Mechanical Pads&Supplies
83550 Spec Services.Inc. 7.283.66 Engineering Services J-33-1
83551 The Suvwell Company 1,174.43 Training Supplies-First Ain/CPR/AED
83552 Strategic HR 325.00 Training Registration
$3553 Sunsel Industrial Pads 100.05 Mechanical Pads B Supplies
83554 T&D Communications 1,833.90 Telecommunications Cabling Service-Repair CopperlFiber lniresuuclure
83555 TekSysems 6,216.00 Temporary Employment Services
83558 The Standard Insurance Company 197.00 Executive Disability Insurance
83557 Thompson Industrial Supply,too. 1,949.10 Mechanical Pare&Supplies
83558 TonyS Lock&Safe Service It Sales 171.06 Locks&Keys
83558 Truck&Auto Supply.Inc. 2,633.34 Automotive Pads&Supplies
83550 US Filter Corp. 150.00 Service Agreement-DI Water Systems at Plants I&2
83561 ULlne 231.91 Truck Pads&SUPples
83562 U.S.Geological Survey 15.497.40 Professional Services-Deployment Current Meter Off Huntington Beach 07-06 to 10-06
83563 Uns Sctenefic 414.66 Lab Pans&SUPPles
83564 UndergrouM Service Alan of So.Calif 1.609.60 Membership-Underground Utility lden11fce11aNNotifcetion Service
83565 The Unlsource Corporation 671.07 Din.Supplies
83566 United Parcel Service 15.96 Parcel Services
83567 Vapex,Inc. 714.00 Instrument Pads It Supplies
83568 Vernon Celifpmie 714M Telephone Services
83568 Verimn Wreless 307.67 Wheless Telephone Services
83570 Vemes Plumbing 1,920.00 Service Contract-Testing&Can.BackBow Devices at Fie.1 It 2&Pump Sta.
83571 Yuton Service Plan CA 9.874.50 Vision Service Premium
83572 VAR Scientific Products 11.289.09 Lab Pads&Supplies
83573 The Wackenhut Corporation 4.131.13 Sewdy Guards
83574 Warble Automation 3.688.15 Mechanical Pans&Supplies
63575 Waste Markets Conn. 8.084.02 Mont.Agree.-Grit&Screenings Removal&Digester Matt Removal
83576 Waxier Sanitary Supply 1,868.06 Janitorial Supplies
83577 West MannelE&B Discount Marine 113.0 Mechanical Parts&Supplies
83578 Wright Way Developments 320.00 Instrument Repair&Maintenance Services
ntlepMSPEieA]M1P8NRNE1CWms PW aepdaIDOMIwans Pon neNn-a lI EXHIBIT
IkJ21om Page 7 of 8 wimm
Claims Paid From 08101106 to 011WIM8
WamaMNa Vender Amount Description
8357E Xyon Business Solutions,Inc. 7,580.00 Temporary Employment Services
83580 TeotSnu C.Alpha 58.00 Meelingf7reining Expense Reimbursement
83581 EmIBOArislon 100.00 Meetingrostrang Expense Reimbursement
83582 Relkumar Behan 54.00 Meeling/Training Expense Reimbursement
83583 As K.Chang 53.00 Meelin9Rrelnln9 Expense Reimbursement
83684 Kimberly A.Erickson 48.33 Meetin9Rrelning Expense Reimbursement
$3555 Mike J.Handle 84.00 Meeting/Training Expense Reimbursement
83586 Larry E.Lazorek 58.00 MeetingRralning Expense Reimbursement
83587 Denbo M.Martinez 35.07 MeetinpRrelning Expense Reimbursement
83588 Jelhey L.Pearson 58.00 Meeting/Training Expense Reimbursement
83589 William F.Pierce 48.00 MeellnBRrdlning Expense Reimbursement
83690 South Coast Air Carl Management Dist. 1,541.34 Pemil Fee-Portable Odor Control System
83591 David A.Usher 53.00 Meeting/Training Expense Reimbursement
83582 Cmex International 8.415.00 Legal Services-Construction Management P2-60
83593 Employee Activity Committee 108.D0 IDEA Award!Expense-10%of Award!
83594 Orange County Sanitation Direct 14.337.76 Workers Comp.Reimb.
83595 South Coast Air Duality Management Dist, 644.59 Employee Commute Reduction Program
835915 Me Standard Insurance Company 2663.58 ExeculNe Disability Insurance
Total Accounts Payable-Warrants $11,801.2B .38
Payroll Dist".....LL
33897 - 33991 Employee Paychecks S 130,41340 Bhveekly Payroll 0B102106'
33996 - 33998 Employee Paychecks 826.1111 Interim Payroll 08103106
U075 - 34079 Employee Paychecks 1,468.0D Interim Payroll D8I15MS"
128954 -129516 Direct Deposit Statements 1,098,232.42 Biweekly Payroll 0810MG
Total Payroll Disbursements
lateral W of sananse on 07Q 6N DIA216 Peep dale
••Pmnd eur or eoplmm m call Wood A.bnwaxly MPW vl N WIM
Wire Transfer FaVm0dLL
OCSD Payroll Taxes 6 Coniribulions $ 037,362.45 Bnveekly Payroll 06102J06
Deutsche Bank 461,031.42 Series 2006 Cedibudes of Participation July Interest Payment
Lloyds TSP Bank plc 51,754.83 Sens 2001 COPS Standby Purchase Agreement Commitment Fee(05101 106-011MI106)
Chase Manhattan Bank 66,582.48 Series 2000 Rebinding COP.Standby Purchase Agreement Commitment Fee(05MIM-07/31/06)
JP Morgan Chase Bank 5,191,542.53 Series 1993 Refunding Certificates of Participation July Inleresl 8 Principal Payment
Despite Bank 56.071.90 Series 2006 CorliBmtes of Participation Commitment Fee(05101/06-07131f06)
Soclem Generale,NY Branch 53.083.93 Series 1993 Refunding COPs Standby Latter of Credit Commission W1f06
Total Wire Transfer Payments 6,517,928.31
Total Claims Paid 08101/p8-0011510 6 $19.628.166.52
HWe,faaNE%CEL dlxQm P$NARBCIms Pad neP AClcame Pad Rpan-0a-0SC4 EXHIBIT
A„mmd Page 8 of 6n2gJ[a er
Claims Paid From 08116106 to 08131MS
Warred No. Vendor Amount Description
Accounts Payable-Warrants
83597 Hewlett Packed Company S 57.687.78 (1)Printer,(1)Server,and(50)PCs
83598 Pacific Investment Management Co. 132,458.83 Investment Management Service Res.
83599 Sunset Beach Sanitary District 333,594.99 Cooperative Projects Reimbursement Program
83800 So Cal Gas Company 38.098.18 Natural Gas
836Ut UBS Financial Services,Inc. 26,308.88 Remarketing Fee-1992 Advanced Rel untling COPS
83602 County of Orange Auditor Controller 45,480.60 County Assessar's Properly Attributes 2006-07 Roll Year
8M03 American Water Works Association 150.00 Membership
8M04 Accurate Environmental Services Inc. 4,000.00 Services-Relative Accuracy Test Audit for(3)CGS Engines
83605 At,.Safety.Inc. 241.61 Freight Charges
BM06 American Express 19.218.91 Purchasing Cad Program.Misc.Supplies&S.M.
83507 Arch NWreless Operating Company.Inc. 1.022.14 Wireless Services
83605 AT&T Universal Biller 1,9571M Telephone Service
83609 AT It T Caliklrola IOCI 75045 Telephone Service
8361D American Telephone&Telegraph Corp. 32.17 Telephone Service
83511 Awards&Trophies Company 64.12 Awards&Plaques
83612 Balance Consulting.Inc. 1,09040 Training Regialmlion
83613 Basic Chemical Solutions,L.L.C. 23,591.57 Such.BisulFite&Sodium Hydroxide
83614 Bell Pipe&Sooty Co. 2,187.84 Mechanical Pads&Supplies
83515 Bennett Bowen Lighthouse 181.73 Repair It Maintenance Services-Biosysleme Monitors
83616 Bergmann Associates,Inc. 1.077.50 Bensem Maintenance-Dig Stand
BM17 Son lloglsHx,L.L.C. Zooli.00 Prof.Sam.-Preparation of Intend Arbitrage Rebate Repel Re 1992 Sales COPS
83618 Bdlhlnee Electric 728.75 Electrical Pads&Supplies
83619 City of Tustin 5,000.00 Permit Fees 7-37
83620 Court Trustee 98.62 Mae Garnishment
SM21 Calibrate Auto Collision 546.50 Truck Body Repair-VA40
SM22 Cad Wanes&Co. 1.407.92 Insurance Claims AdmMdlralm
BM23 CASA 100.00 Meeting Registration-Division 660
83624 Circles 3,285.00 OCSD He%for 0&M
SM25 Compressor Components of California 14,998.80 (24)LSVS Pilot Fuel Check Valves
83826 County of Orange Auditor Controller 35.00 Encroachment Permit 74b8
83627 County of Orange Auditor Controller 105.00 Encroachment Permit 736
83628 County of Orange Auditor Controller 3,140.00 Assessor's Preliminary 20116-07 Rog&Cossftekrence File
83829 County of Orange Health Care Agency 4,871.00 Underground Storage Tank,Hazardous Material,&Slate Fees
83630 County of Orange Health Care Agency 1,056.00 Underground Storage Tank,Hazardous Materiel,&Slate Fees
83631 County of Orange Health Care Agency 4.803.00 Underground Storage Tank,Hazardous Material.&State Fees
83632 County of Orange Health Care Agency 559.00 Underground Stomp Tank,Hazardous Material,&State Fees
BM33 County of Orange Health Cara Agency 559.00 Underground Storage Tank,Haredpus Material,&State Fees
83634 CSAC Excess Insurance Authority 3.158.62 Employee Assistance Program
83635 Culligan of Orange County 48.16 Meint.Agreement-Can Gan Water Softener System
83636 CWEA Membership 220.00 Membership(Calif.Water Environment Assoc.)
03637 0.R.McNally&Associates 2.590.00 Training Registration
83638 Devise Technical Products 16.075.00 Repair&Maintenance Services-Pit.2 Junction Box Slide Gate
83638 OHL Express USA,Inc. NAB Freight Servtces
8364D Edrund 310.49 Wage Garnishment
83641 Employee Benefits Specialists,Inc. 10.479.60 Reimbursed Prepaid Employee Medical It Dependent Care
83642 Court Order 420.00 Wage Gamishment
HWapNSTE%CEl.mav2oaysrwa[rcwim:Pats aepomosa>\Cmim:rda nepon.oea1-06 EXHIBITS
eiuerpra Page 1 of 11 wly2ppe
Claims Paid From 08116106 to 08131m6
Warrant No. Vendor Amount Description
83643 FeEez Corporation 7427 Freight Services
SM44 Franchise Tax Board 116.55 Wage Garnishment
83645 Frys Electronics 377.11 Computer Supplies
8W46 Green Parrot 119.08 Meeting Supplies P240
83647 GTSI Corporation M.70 Computers&Hardware/Sollware
83648 Hill Brothers 4.718.16 Chemicals-Odor B Corrosion Control-Newport TmrYrline
83649 Internal Revenue Service 125.00 Waga Gamishment
83650 Intl.Union of Oper.Erg.AFL CIO Local 501 4,M9.76 Dues Oeduclicn
83651 Irvine Ranch Water District 6.75 Water Use
83652 Kelly Paper 131.49 Paper
83653 Klanfelder,Inc. 5.543.00 Soils,Concrete&Other Materials Toiling
83654 L&N Uniform Supply Co..Inc. 1.314.19 Pulp Shirts
83655 Lance Bell and Longhand 12,823.00 Professional Services-Internal Auditors
82656 Court Order 150.00 Wage Garnishment
OM57 Lormcn Education Services 1,734.00 Training Registration
8W58 M.J.Schiff and Associates,Inc. 8,468.60 Engineering Services J-106
BM59 McGraw Hill Companies,OBA ENR 15,432.00 Notices&Ads-Venus Jobs FY 0647
83880 McMaster Can Supply Co. 248.37 Mechanical Pads B Supplies
83661 Midway Mfg,B Machining Co. 17.132.25 Repair&Mainh nance Services-Belmar Bell Press Drive Roller
83662 Court Order 225.00 Wage Garnishment
83663 Municipal Water Distiid of OZ. 10.000.00 Water Emergency Response Organization of Orange County(WEROC)Funding 0"7
83664 MVA Architects 237.50 Prohukinal Services-North County Yard Formed Site Evaluation
83665 National Bond&Treat 1.960.28 U.S.Savings Bonds Payroll Deductions
83666 OCEA 601.53 Dues Deduction
83667 Onesd rm Dlslribulors,Inc. 54.78 Electrical Pads If Supplies
83668 Orange Counter 21.57 Couder Services
BM69 PBS&J 17,575.00 Professional Services 241
83670 PCG Industries 800.00 Pump Repelis
8W71 Peace Officers Council of CA 1,5M.00 Dues Deduction.Supervisors&Prnfesslonals
83672 PerklnElmer Las 2,300.00 Training Registration
8W73 Pane"Soma 506.31 Repair Service-Aulometed Electronic Mail Opener
83674 Platinum Advisors 20,000.00 Legislative Advocacy Efforts&Participation In Legislative Affairs Committee Meetings
93675 Primavera Systems,Inc. fl. 0 .00 Software Maintenance
83676 Printed, 295.00 Software Maintenance
$3677 Public Resources Advisory Group 1,232.32 Financial Advisory Services
BM78 R.F.MacDonald Co WAI Repair&Maintenance Servi-Cleaver Brooks Bailer
83579 Science Applications International 18.505.47 Ocean Monifonng MO 8-0-94
83680 Small!Voice&Dab,Inc. 2.284.79 Telephone System Maintenance
small Smith Pipe&Supply.Inc. 2,656.73 Landscape litigation Supplies
SM82 Court Order 721.50 Wage Garnishment
8W83 Southern California Edison 2,970.20 Power
83684 Summit Steel 851.31 Metal
83685 Systems Solution Company 3,797.80 Imuallatlan of Accord;Control Card Reader for Purchasing Contracts Management Troller
838H Thomas V.Gedinger 2,730.00 Lab Analyses
83687 Thompson Industrial Supply.ins. 4,055.20 Mechanical Pads&Supplies
83688 T-Moble 106.33 Welfare Ah Time
83689 Tri-Stab Seminar OMhe-River 315.00 Training Registration
HW ,:MiAE%CEL NnrS2W9PSHARE\mms Pad ftwadW Acams PO4 aepon-Oaitffi EXHIBIT
rw21pa0 Page 2 of 11 enmooa
Claim Paid From 08116106 m 08131MG
Warrant No. Vender Amount Description
8369D United Parcel Service 113.75 Parcel Services
SM91 United Way 160.00 Employee Conti bulmns
83692 US Peroxide.L.L.C. 11,886.67 Odor&Corrosion Control Treatment for Coll.Sys.:Hydrogen Peroxide&Ferrous Cid rid.
83693 Vedxon PS3 Telephone Service
83894 Vernon California 118.77 Telephone Services
83595 Vortex Corp. 1,099.95 Bi-Annual Maintenance on Roll-Up Doors at Plant 1
83696 Water Environment Federation 182.00 Membership
83697 Westin Solutions,Inc. 14,055.00 Outside Laboratory Services-Core Ocean Monitoring Program
83698 Yellow Transportation,Inc. 1,098.34 Freight Charges
83699 Court Order 597.50 Wage Garnishment
83700 1-800-Confererroe(R) 425.86 Telephone Conference Calls
83701 David Andrade 94.00 Meeting/Training Expense Reimbursement
83702 Nicholas J.AMonles 20.00 Mee9ngVTmining Expense Reimbursement
83703 Emilio Arisron 73.00 Mee8nglTraining Expense Reimbursement
83704 Layne T.Baroldl 583.30 Mee6ng/fmining Expense Reimbursement
83705 Thomas M.Blends 188.18 Meeting/Training Expense Reimbursement
83MB James L.Bum 150.00 Meeting?mining Expense Reimbursement
83707 William D.Cassidy 520.32 MeeBngMaining Expense Reimbursement
83708 Olga Cervantes 52.00 MeempTraining Expense Reimbursement
83709 Viclode L.Francis 270.16 MeeBngRreining Expense Reimbursement
83710 Richard Gallegos 131.76 Meeting/Trelning Expense Reimbursement
83711 Thomas S.Handy 698.98 Meeting/Training Expense Reimbursement
83712 Steven E.Howard 1.183.09 MeetingrTraining Expense Reimbursement
83713 Jeffrey L.Key 63.00 Meeting Training Expense Reimbursement
83714 Patrick W.MCNely 48.00 Meetingfra ing Expense Reimbursement
83715 Tom B.Meregillano 30.00 Meel ngRmining Expense Reimbursement
837% Michael D.Moore 486.90 Meeting/Training Expense Reimbursement
113717 Adam A.Nararoff 1,165AI MeeBngr7mining Expense Reimbursement
83718 Mann Talebi 1,532A0 Meeffng/Tratning Expense Reimbursement
83719 Robyn A.Wilcox 173.00 MeeBngiTraining Expense Reimbursement
8372D Ken H.Mrs, 4.81 Meetng7Tnuning Expense Reimbursement
83721 City of Westminster 295.00 Encroachment Permit 03-58
83722 CityMAnaheim 2,659.00 Permit&Inspection Fees 03j8
83723 City of Fullerton 2,638.00 Permit&Inspection Fees 03-58
83724 Garden Grove,City of 305.00 Permit&Inspection Fees 03-58
03725 County at Orange 260.00 Permit&Inspection Fees J-77
837M CWEA 125.00 Training Registration
83727 Taco Industries 119.82 Mechanical Pads&Supplies
83728 Yvonne L.Schwab 80.00 Claim SeBlement
83729 Time Wrehouse 3,89839 Tires
83730 Air Products&Chemicals,Inc. 25.829.07 O&M Agreement Oxy.Gen.Sys.MO 8-8419
83731 AKM Consulting Engineers 29,317.50 Professional Services-Pad-Time Dig Alen Technician
83732 ALFA-IAVAL INC. 53713.38 Spiral Heat Exchanger for Digester No.16
83733 Basic Chemical 80Ialions,L.L.C. 43,951.12 Sodium BisuMte&Sodium Hydroxide
83734 Brown&Caldwe0 538,213.13 Professional Services P2-90&P2411
83735 Camp Dresser&Mass,Inc. 122,005.78 Engineering Service J-714
83736 Kemiron Companies,Inc. 159,932.32 Ferric Chloride
H wpxwseEXCELee1SLPAPSHME1CWms Paid RepmaWOACIamf Pad RepM.08.31-0 EXHIBITS
f nchm Page 3 of 11 Wimons
Claim Paid From 08116106 to OW31m6
Warrant No. Vendor Amount Description
83737 Lee&Ro,Inc. 28.574.87 Professional Services 5.50,S51&532
83738 Malcolm Pimle,Inc. 403.695.62 Professional Servces J-79,11-26,1.10&P2-80
83739 Me1Life Life Insurance Company 36,575.61 Group Life,Manager Addl.Life.Shan&Long-Term Disability 9 Optional Team Life Ins.
83740 Occidental Energy Marketing.Inc. 183,549.97 Natural Gas for CenGemCoGen
83741 Orange County Water District 3,856,358.95 Joint GWRS Project J-36
83742 PereerAmedces,Ira. 242,390.87 Sodium Hypochlode
83743 Polydyne,Inc. 39,918.76 Cationic Polymer M03-11-92
83744 RBF Consulting 38.653.12 Engineering Services 241&7.38
83745 SAWPA 649,120.84 FEMA Pmjecl Grant Funding 2414
83746 SouMem Calgomia Edison 314,283.39 Power
83747 Tule RanciVMagan Forms 255.730.97 Residuals Removal MO 3.29-95
83748 Vedanta Check - -
83749 Helix Electric,Inc. 266,403.49 Construction SP-81
837M J F Shea Construction,Inc. 4,969,151.18 Constmctipn P258
83751 J R FIIadc ConMmction 1,489,470.30 Construclion Pt-82
83752 Margate Construction,Inc. 387,600.00 Consonance P1437
83753 Mike Bubelo Construction Co.,Inc. 610,821.0D Construction 1-24A
83754 Union Bank of California 31.832.61 Construellon SP51,Retention
83755 South Coast Air Quality Management Dist. 27.009.92 Permit Fees-Annual Emission,Operation&Misc.Fees
83756 J F Shea Constmelon,Ira. 327,769.00 Construction J-77
83757 California Business Bank 278.632.20 Construction I-24A,Rebmann
83758 Ken Thompson,Inc. 144,627.311 Construction 2414B
$3750 Absolute Standards,Inc. 1,80040 Lab Pans&Supplies
83760 Am Sludge 458.78 Lab Pam&Supplies
83761 AccuSlandand 2.125.72 Lab Pads&Supplies
83762 Agilent Techr o ogles,Inc. 434.79 Lab Pam&Supplies
83763 Airgas Safety.Inc. 3.468.79 Safety Supplies
83764 Aigas-Weal 9.30 Demurrage
83765 American Fidelity Assurance Company 536.00 Employee Voluntary Cancer Insurance
83768 AppleOne Employment Service 8,643.41 Temporary Employment Services
83767 Applied Industrial Technology 451.18 Mechanical Pads B Supplies
83768 Aquatic Bioassay and Consulting Labs,Inc. 1,130.00 Whale Effluent Toxicity Testing
83768 AT&T Universal Biller 2,058.35 Telephone Servce
$3770 AT&T OalicmiaRACI 2,737.87 Telephone Service
83771 American Telephone&Telegraph Corp. 25.02 Teephane Service
83772 AWSI 229.00 Department of Tmespomlcn Program Management B Testing
83773 Bar Tech Telecom,Incorporated 45012 Telephone Equipment
83774 Battery Specialties 38.14 Bananas
83776 Bee Man Pest Control,Inc. 575.00 Pest Coned
83776 Bell Pipe 9 Supply Co. 1.266.19 Mechanical Paris&Supplies
83777 Ben Meadom Company,Inc. 133.31 Lab Parts&Supplies
93778 BloMemux Visa,Inc. 1,437.52 Lab Paris&Supplies
0779 Back&Veatch Corporation 18,789.08 Engineering Services Pt-76
83780 Boyle Engineering Corporation 18,865.96 Prefeeahmal Services 1-24
83781 Buckram&Asaociaas,Inc. 2,818.00 Professional Services-Pavemed Management
83782 California Hazardous Bannock,Inc 1,500.00 Underground Storage Tank Codification
83783 California Reakudon Services,Ina 941.25 Office Files MovinglRe.calce Samicss
N:WepamTE%CFLEINYrrV9lNaflCla�r,e Pas aeppm80TGnne PW is c -pN1Le EXHIBIT
firer Mc Page 4 of 11 p124000
Claims Paid From 09116106 to 0813IMS
Warrendale, Vendor Amount Description
63784 Callan Associates,lam 3.759.50 nrveslment Advisor
83785 Cameron Compression Systems 1278.10 Mechanical Pads&Supplies
83780 Cameron Welding Supply 432.79 Welding Pens&Supplies
83787 Cardloa Fuel Systems,Inc. 21,710.22 Fuel Card Program-District Vehicles&Monitoring Vessel
83788 Cincinnati Incorporated 680.00 Repair&Maintenance Services-Press Break
83788 Cingular Wireless Airtime 5.043.55 Wreless Services
83790 CMAA 55.00 Training Registration
83791 Compressor Components of California 4.480.00 Repair&Maintenance Services-(32)LSVB Pifot Fuel Values
83792 Computer Protected Technology,Inc. 6.193.31 Computer Batteries Maintenance Agreement
83793 Consumers Pipe It Suppy Co. 120.95 Plumbing Pads&Supplies
83794 Corporate Express 6,373.27 Office Supplies
83795 Corporate Image Maintenance,Inc. 168.00 Custodial Services Spec.No.9899-09
83796 County Materials Electric Co. 271.65 Electdcel Pads&Supplies
83797 CR&R,Inc. 1.905.00 Container Rentals
83798 David's Tree Service 8,030.00 Tree Meant.Service
83799 ODB Engineering,Inc. 1,312.95 Professional Services-Grant Management
83800 Delia Packaging Products.Inc. 147.58 Lab Pads&Supplies
83801 Davis.Cemoretion 412.88 Lab Pads&Supplies
83802 E.Sam Jones Distributers,Inc. 473.07 Electrical Pads It Supplies
83803 Elect Air 574.74 Valve
838N Electrical Rehebiliy,Services 1,21040 Professional Services-Elecdcal Reliability Testing for Capital Pro)ecs
83805 Emergency Management Network,Inc. 7,700.00 Onats Fire Extinguisher Salary Training
83806 Employers Group 4,375.00 On-She Training-Supervisory Training
83807 Enchanter,Inc. 6.500.00 Ocean Monitoring&Outfall Inspection&Maintenance
83808 Environmental Compliance Inspection Svcs. 920.00 Professional Services-Fab,ON Gresse(FOG Program)Inspections
83809 Ewing migatfon Industrial 2,21222 Landscape Initiation Parts&Supplies
8381D FEDEX Corponeon 178.76 Freight Services
$3811 First American Real Estate Solutions 345.00 Online Orange County Property Informalien
83812 Fisher Scientific 3,319A7 Lab Pads&Supplies
83813 Flat&Vertical,Inc. 1.529.00 Care Drilling
83814 Flo Systems,Inc. 936.84 Pump Pads&Supplies
83815 Fountain Valley Rancho Hand Wash 1.052.00 Vehicle Washing&Waxing Services
83816 Franklin Covey IN.23 Office Supplies
83817 Fuller Truck Accessories 1,035.19 Truck Parts&Supplies
83818 Galley Associates,Inc. 1,854.54 Investigation Services
83819 Canahl Lumber Company 1,554.58 LumberManiware
83820 Ga raft Callahan Company 1,104.87 Chemicals
83821 G.E.Supply 4,45722 Electrical Paris&Supplies
83822 George Yardley Co. 1.99725 Instrument Pads&Supplies
83823 Gan ichwitchen,Inc. 11,615A5 Mechanical Pads&Supplies
BM24 Goldenwest Wndow Service 730.00 Groundskeeping Services
83825 Grainger,Inc. 340.38 Mechanical Parts&Supplies&Fixtures
83826 Graphic Distributors 212.91 Photographic Supplies
83827 Graybnr Electric Company 44.90 Electrical Pads&Supplier
83828 Great Western Sanitary Supplies 20.90 Janitorial Supplies
83829 GTSI Corporation 6,504.70 (2)Panasonic Toughbook Computed;&Misc.Hardware/Software
83830 Guarantee Records Management 670.78 OBSIte Records Storage
N`YvxdvwA XCELObUNAP$HARE1Chama Pad WpgnC80TCIapne Pad Ramn-01411-05 EXHIBIT
Incl at Page 5 of 11 W12ralce
Claims Paid From OBIIMG to ON31106
Warren No. Venda, Amount Description
63831 Heaker Equipment Company 1.599.06 Moi Vehicle,Parts,Repairs&Service
83832 Hach Go Penton Industries 913.05 Lab Paris&Supplies
83833 Harold Primrose Ice 240.00 Ice For Samples
83834 Hill Brothers 21.8".19 Chemicals-Odor&Corraabn Control-Newport Trunkline
83835 Home Depot 1.181.19 Mew.Repair&Maintenance Material
83836 Help Auto Supply $26.44 Vehicle Paris&Supplies
83837 Industrial Dislnbrfion Group 2.162.81 Mechanical Paris.Supplies.Locks&Tools
83838 Industrial Filter Manufacturers.Inc. 1,008.53 Filters
83839 Industrial Metal Supply 1.117.37 Metal
83840 Information Handling Services 2.770.00 Silvers Mantenane&Support-NFPA Data Pages
83841 Interstate Batteries of Cal Coast 493.11 Bahedes for Vehicles&Carls
83842 Iron Mountain 100.00 Storage Fee-Bid Documents Pt-37
83843 ISI,Inc. 1.661.80 Software Maintenance&Support-Infodel for Windom 1000 with Polling Software&Rate Table Updates
83844 J&L Industrial Supply 115.80 Tools
83US JG Tucker and Son,Inc. 1.460.01 (35)Flag Bracket Kits for Mounting Flags on Traffic Control Signs
83846 Jamison Engineering Contractors,Inc. 23,844.60 Rep.&MaInL Svrs.-Per,1&2-Gale,Antennas,Fen Modif.,Trickling Filters.Leak&Sampling Line
83847 Jays Catering 489.90 Meeting Expenses
838e8 Johnsen&Associates.L.L.C. 5.000.00 Professional Services.2006 OCSD Market Survey
83849 Kbrce,Inc. 1.716.00 Temporary Employment Services
83850 Klesel Environmental Lab 360.00 Outside Laboratory Services
83851 Klelnblder,Inc. 15,507.90 Soils.Concrete&Other Materials Testing
83852 L&N Image Apparel 78.09 OCSD SIaBJackels w/Logo-Medical Team
83853 Uecem Safety.Inc. 2,202A4 Specially Gases
83854 Lorman Education Services 339,00 Training Registration
83855 Lucas Germinal Footle.Inc. 315.05 Meeting Expense
$3856 Maintenance Products.Inc. 5.333.63 Mechanical Parts&Supplies
83857 Mandic Motors 155A0 Taxing Services
83858 Manpover Professional 5.370.00 Temporary Employment Services
83859 Memo Electronics 50.91 Electrical Pads&Supplies
83860 McMahan Business Interiors 5.043.41 Miscellaneous Office Fumllure
83861 McMaster Can Supply Co. aa.39 Mechanical Pads&Supplies
63862 Medlin Controls Co. 172.72 Mechanical Pens&Supplies
83863 Mogan Company 1,751.09 Auto Pads&Supplies-Installation of Rear-Mounled Winch on V-552
83864 Motion Industries.Inc. 47.71 Elec0ial Paris&Supplies
83865 Greater LA Chapter Had.Safety Council 825.00 Membership
83866 Neal Supply Co. 36.09 Plumbing Supplies
83857 New Horisons.C.L.C.of Santa Ana 600.00 Twining Registration
83868 Nfokey Petroleum Co.,Inc. 258.44 Grease
83869 NRG Thermal Services,L.L.C. 6.06 Mechanical Pan&Supplies
83870 Nu Way Laser Engraving 2.222.84 Asset Tags
83871 OCB Reprographics 22,866.92 Punting Service-M01126IN0
83812 Office Depot Business Services Division 5,711.74 Office Supplies
83873 Onesoume Distributors,Inc. 2,606.35 Elecidcal Pads&Supplies
83874 Orange County How Company 237.63 Hytlreulic Hose Supplies&Pads
83875 Orange County Vector Control District 38310 Pest Control
83876 Orange Fluid System Technrolo0ks,Inc. 8.45 Plumbing Pads&Supplies
83877 Oxygen Service Company 825AG Specialty Gases and lab Park Supplies
HW PrvsdE%CEL,a Aca0APSHARE%CYmu Pad RepmN6eTClsmr Pail eepm-p 3-6 EXHIBITS
nN210t Page 6 of 11 BII2RapJ
Claims Paid From 0111161 to 08131106
Warrant No. Vendor Amount Description
83878 Pacific Mechanical Supply 311.81 Plumbing Supplies
83879 Parker Supply Company 1.766.69 Fibers
83880 Parsons Water&Inhashuclure,Inc. 13.677.88 Professional Services J-35A
83851 Pablol Video Productions 21.55 Video&Edging Services
83882 POD Industries 4.550.00 Repair&Maintenance Services-Pump Shea
83883 Peripheral Manufacturing,Inc. 57.25 Beck-Up Tapes&Degaussing of DLT Tapes
83884 PL Hawn Company,Inc. 125.42 Electrical Paris&Supplies
83385 Plelinum Advisors 5.000.00 Legislative Advocacy
83886 Pod Supply 42.55 Boots for Emplayse Assigned a Ocean Monitoring Activities
83887 Prouder.Inc. 303.86 Lab Pads&Supplies
83868 Prei Legal Services,Inc. 881.85 Employee Voluntary Legal Service Insurance Premium
83889 Primary Source Office Furnishings,Inc. 6,536.94 OIBae Furniture It Misc.Equipment
83890 Propipe 5,576.67 Screening Video Inspections
83891 Prudential Overall Supply 2,132.12 Unbarred,&Related Articles
83892 0Air Calif.-Div.Pump Engineering 1,549.47 Air,Oil&Separator Fibers
83893 Relieslar U e Insurance Company 8,556.98 Voluntary Ufe,Cancer&Supplemental Short-Term Disability Insurance
83894 Rae Systems,Inc. 608.79 Instrument Repairs
83895 Rainbow Disposal Co. 3.104.33 Trash Removal
83896 Resfek Corporation 822.61 Lab Pena&Supplies
83887 RMS Engineering&Design,Inc. 1,497.50 Engineering Services-Design Barricade for Pit.1 Scrubber Complex Draining Pipe Repairs
83898 Rockwell Engineering&Equipment Co. 6,757.08 Pump Pens&Supplies
83899 RPM Electric Motors 10.135.29 Motor Repairs
83900 Rutland Taal&Supply 319.60 Mechancal Pads&Tools
83901 Safe T Rack Systems,Inc. 513.00 Lab Paris&Supplies
83902 Sancon Engineering,Inc. 5,325.00 Construction-Manhote Rehab.Project
83903 Science Applications International 19,282.81 Ocean Monitoring&Strategic Process Studies
83904 Scott Specially Gases,In. 60.12 Demurrage
83905 Sheshuno8 454.95 Publicelim
83906 Shunduck Sales&Engineering 1,630.55 Mechanical Paris&Supplies
83907 Siemens Water Tectaxi Corp. 1,182.58 Service Agreement-DI Water Systems at Plants 1&2
8390E Skater,Inc. 3,293.87 Lab Pans,Supplies&Instrument Maintenance
83909 Society for Human Resource Management 160.00 Membership
83910 Sobdmlce Corp. 6,488.91 SobWane
83911 Southem Cafifamle Edison 33.26 Power
83912 Southern California Trine Service 4,110.03 Mechanical Paris&Supplies
83913 Southern Counties Lubricants 8,44SA0 Oil&Dinner
83914 Sparkle0s 2.914.94 Drinking Water/Ccoler Renlels
53915 St.Cdox Sensory,Inc. 1,640.00 Olaclomeby Testing Services
83916 Stanley Seemer Intematlonal,Inc. 368.00 Carpel Cleaning Services
81 Seven Trent Labontodes,Inc. 700.00 Outside Labonary Services
83918 Sunset Industrial Paris 18.18 Mechanical Pans&Supplies
83919 Technical Service Group.Inc. 1,381.60 SCADA System VAX Service Agreement
83920 Synagm West,Inc. 082.48 Residuals Removal MO 3.2946
83921 TekSyslems 7.770.00 Temporary Employment Services
83922 Terminb Intematlonal 984.00 Pest Control
83923 The Jankavlch Company 1,604.83 00
83924 Thermo Forma,Inc. 3,244.47 Maintenance Services- (3)Laboratory Incubators
H WepYJ9AE%CEL NB220APSHARE\Cklms Paid RaoilicfiOTClelme Paid Radial-0aaraa EXHIBIT B
ri Page 7 of 11 9112non
Claims Paid From 08I1WO6 to OBJ31106
Warrant No. Vendor Amount Description
83925 Thompson Industrial Supply.Inc. 6,917.47 Mechanical Paris B Supplies
83926 Times Community News 150.00 Notices&Ads
83927 Todd Painting,he. 1,820.00 Painting Services
83928 Tony's Lock&Safe Service&Sales 500.46 Locks&Keys
83928 Towraend Pubfic Affairs 5.000.00 Legislative&Executive Advocele for Grant Funding
83930 T"Iste Seminar On4he-River 45A0 Training Registration
83931 Truck 6 Auto Suppy.Inc. 303.68 Automotive Patti&Supplies
83932 Ultra ScienBfiC 390.30 Lab Pads&Supplies
83933 United Pacific Services,Inc. 19.617.51 Landscape Maintenance at Plants 1&2 and Pump Stations
83934 UnRW Parcel Service 1.762.06 Parcel Services
83935 University of Southern California 350.00 Tralning Registration
83936 US Equipment Co.,Ine. 286.98 Air Fillers
83937 Ved7on California 81.95 Telephone Services
83938 Vemes Plumdng 2,040.00 Service Contract-Testing&Cad.Baci low Devices at PIW.1&2&Pump Ste.
83938 Village Nonsense 180.46 Landscaping Supplies
83940 Vortex Corp. 4,995.87 Repair,Malnl.&Testing Sort.-Pit.2 Entrance Gate.Mi.2 Rolling Steel Doors,8 Engrg.Trailer Gas
83941 VWR Scientific Products 10.958.16 Lab Pans&Supplies
83942 The Wackenhut Corporation 8,075.11 Security Guards
83943 Waste Markets Corp. 22,314.95 Must.Agres.-061&Screenings Removal&Digester Marl Removal
839" WEF 10.00 Membership-Water Environment Federalsn
83945 Walls Supply Co. 247.35 Mechanical Pans&Supplies
83946 WestcliB Medical Labs 235.00 Lab Semces-Work Related injuries
83947 Western States Controls 1,664.87 Portable Calibrator
83048 XEROX Corporation 16.918.37 Stationery&Office Supplies
83949 Yale/Chase Malamute Handling,Inc. 134.03 Electric Can&Cad Pena
83950 Voided Check - -
83951 Deirdre E.Bingman 615.56 MeelingRraining Expense Reimbursement
83052 Marc A.Brown 107.21 MeelingRrelning Expense Reimbursement
83953 James E.Colston 36.00 Meeling/Tmining Expense Reimbursement
83954 Ruben P.Ghlrelli 1.090.03 Meelingrroilning Expense Reimbursement
83955 Ingrid G.Helsbrend 11937 Meedng/Tralning Expense Reimbursement
839H Penny M.Kyle 34.25 MeedngRralning Expense Reimbursement
83957 Kathleen T.Millaa 673.46 MeetingrTralning Expense Reimbursement
83958 John Mirkovsh 58.00 MeetingRralning Expense Reimbursement
83959 Adam A.Na7aro8 108.10 Meeting/Traming Expanse Reimbursement
83060 OWnh D.Nguyen 290.59 MeetingRraming Expense Reimbursement
83961 Fred J.O'Brien 182.09 Meeting7fralning Expense Reimbursement
83962 Pedllls.Gilbert 48.D0 Meeft Traming Expense Reimbursement
83963 Joan E.Parker-Fray 124.85 Meeting/Training Expense Reimbursement
839" Jamlann M.Quash 141.66 MestingTTraining Expense Reimbursement
83965 Mark S.Roberts 101.00 Meeting/Training Expanse Reimbursement
83966 Richard E.Schlegel,Jr. 1,306.03 Meeting7Tralning Expense Reimbursement
83967 Asnieraa Instruments 4.801.37 Coastal MonlWdng Buoy Preparation B Deployment
83968 Orange County Sanitation Distract 1.835.41 Poly Cash Relmb.
83969 South Coast Air Quality Management Dist. 17.526.74 Permit Fees-Annual Emission,Operation&Misc.Fees
83970 Raceway Ford 36,065.79 (1)Ford F250 Super Cab 4X4 XLT with U1I14 Body
83971 Southern California Edison 105.545.43 Power
H tMpNr AE%CELdx M SHARMxirm Pad RepoM06aTCla-Pad Rep,(M.al-06 EXHIBIT
r✓rams Page B of 11 vtvlaoe
Claims Paid From 08116106 to 08131/06
Warrant No. Vendor Amount Description
83972 Synagro West,Inc. 300,495AS Residual,Removal MO 3.29-95
83973 Woodruff Sprddlln B Snarl 130,1N.10 Legal Semloes MO 746-95
83974 Amemn International 1,427,052.40 Construction 1.24
83975 Mike Fisch 8 Sons 64,737.00 Construction FE05-20
83976 Morrow Meadows Corp. 85,500.00 Consimctlon FE0249 FE02410
83977 Garden Grove Banditry District 225,591.02 Cooperelk a Projects Reimbursement Program
83978 Acrylic Designs,Inc. 215.03 Brochure Boxes for OCSD Construction Literature
83979 Air Cleaning Solutions 215.39 Air Fillers
83980 Alrgas Safety,Inc. 2,405.65 Safety Supplies
93981 Alllds,Inc. 690.00 Software-Was Package Sudla Professional-AUP
83982 AT 8 T CshfomkyMCI 105.51 Telephone Service
83983 American Telephone 8 Telegraph Corp. 233.68 Telephone Service
839M Aurora Pictures,Inc. 1,528.00 Salary Videos
83985 Autodesk Univerefty/Enlerprbo Event 4.035.00 Meeting Registration-DWIskm 740
83988 Bask Chemical Solutions,L.L.C. 24.946.95 Sodium Blsul0m 8 Sodium Hydroxide
83987 BMC Business Mechinae Consultant,Inc. 12e.50 Maintenance Service-HP9000 MUNfunctlonal CoplerlScanner
83988 CA Emissions Program 5.35 Vehicle Emissions Program
83989 California Municipal Statistics,Inc. 300.00 Debt Statement for Comprehensive Annual Financial Report 6130I06
83990 Campo Engineers 3285.07 Proesslon it Ser iroe-Annual Rat Study
83991 CH210 HIII 14,951.10 Engineering Samices-Needs Assessment for Environmental Compliance Awareness Program
83992 CMAA 85.00 Training Registration
83993 Compressor Components of CaBfomla 1.248.00 Repair B Maintenance Services-(32)Celt LSVB Ignition
83994 Conrad B Associates.L.L.P. 14.028.00 Professional Services-Financed Auditing Services
83995 County Of Onane Autlltar Controller 70.00 Encroachment Permit P2438
63996 Otetench-Post 1.476.08 Hanging Plans Cabinet and Clamps
83997 Docu source,L.L.C. 2,367.00 Phone 8 Software Updates Annual Subscflpion
83998 Ecology Control Industries 5,386.90 Haaa sous Waste Disposal
83999 Edfund 137.68 Wage Garnishment
84000 Employee Benefits Specialist,Inc. 10.535.15 Reimbursed Prepaid Employee Medical&Dependent Care
84001 Fedex Corporation 320.51 Freight Semi..
84002 Fllnet Conference Headquarters 1,095.00 Training Registration
840D3 First American Real Estate Solutions 450.00 On-Line Orange County Property Information
840N Franchise Tax Board 558.94 Wage Garnishment
84005 Fresco Profiles 789.76 Human Resources Background Checks
84006 Galley Associates,Inc. 2,034.00 Investigation Services
84007 HIM Brothers 17.365.29 Chemicals-Odor B Corrosion Control-Newport Trunkline
84008 City of Huntington Beach 16,184.16 Water Use
84009 Industrial Threaded!Produce,Inc. 300.22 Imentry Fasteners
84010 Internal Revenue Service 125.00 Wage Gamishment
84011 Irvine Ranch Water District 8.57 Water Use
U012 IRWO-Remitted Permit Fees 1.570.00 Recsnctlttion User Fee Refund Program
94013 Keys Productivity Center 170.00 Training Reglsua9nn
84014 Kleeel Environmental Lab 360.00 Outude Labarelory Bemuse
84015 Lam Lighting,Inc. 109.54 Reconciliation Lear Fee Refund Program
840I8 LA Tooling 15.00 Asbestos Analyses
84017 Lexis Next Matthew Bender 156.25 Books 8 Publications
84018 M.J.Schiff and Associates,Inc. 6,905.64 Temporary Employment Servkss
NWpanPR%LFLCbVS7u1P&NFFLIwnr Paid Ra:* Mlxrns Pad Rapon-OM146 EXHIBIT
Aw21gh Page 9 of 11 wi mcs
Chime Paid From 08116/06 to 08131MG
Warrant No. Vendor Amount Description
84019 McMaster-Can 438A1 Fiberglass Ladders wMardware
84020 McGraw HIII Companies.DBA ENR 5.141.00 Notices&Ads-Various Jobs FY 0647
84021 McMaster Can Supply Co. 2A74.77 Mechanical Paris&Supplies -
84022 Mid Weil Associalas 4.862.17 Motor
84023 Midway Mfg.&Machining Co. 2,215.34 Mechanical Paris&Supplies
M024 Mission Uniform Service 30.73 Urge.Rentals
BQ25 Morgan Company 624.03 Mechanical Paris&Supplies
U025 NASSCWPACP 50.00 Books&Publications
M027 National Bond&Trust 1,924.04 U.S.Savings Bonds Payroll Deductions
84028 CIly of Newport Beach 96.87 Wale,Use
84029 O C Tanner Recognition Company 1,288.83 Employee Service Awards Program
84030 OCB Reprographics 651.11 Printing Service-M01/26/00
84031 OCEA 510.76 Dues Deduction
84032 Parker Supply Company 797.42 Stair Step Covers&Yellow Safety Sid"
84033 Pioneer Americas,Inc. 19,681.54 Sodium Hypochforile
84034 Polydyne,Inc. 550.28 Catfonic Polymer M03.1142
84035 Sancan Engineering.Inc. 13.D10.00 Construction Manhole Rehab.Project&Fold
84036 SBC Long Distance 1.365A9 Lung Distance Telephone Services
84037 Schneker Autpmalion,Inc. 6.133.14 Computer Maintenance Agreement
84038 Slanford Center for Professional Dev. 3.9W.D0 Traldng Registration
U039 The Steywall Company 849.53 Training Supplies-First Aid/CPR
M040 Summit Steel 54A5 Metal
84041 Toyloa Racing Development M2 1.570.00 Recancilial User Fee Refund Program
84042 Terrolux International 50.00 Pest Conpol
64043 Time Warner Communficil 61.07 Cable Services
84044 TrlStale Seminar O,r-Iha-RNer 90.00 Training Registration
84045 UC Regents 1,260.00 Membership-Environmental Engineering Affiliates
84046 United Parcel Service 14.44 Parcel Services
$4047 United Way 60.00 Employee Contributions
84048 US Peroxide,L.L.C. 3,198.89 Odor&Corrosion Cement Treatment for Coll.Sys..Hydrogen Peroxide&Fermus Chloride
84049 Veriaon Wheless 302.23 Winless Telephone Services
84050 4Interim.Inc. 7.605.63 Promotional Products
84051 Manhole Construction,Inc. 13.684.50 ConsbucBon Jb7
M052 Shabbir S.Seems 923.81 Meeting/Training Expanse Reimbursement
U053 Jude Brooks, 140.89 Meeting/Training Expense Reimbursement
84054 Carina M.Chaudhry 139.65 Meeting/Training Expense Reimbursement
P055 James E.Colston 156.49 Mending/training Expense Reimbursement
84056 Daisy G.Covamlbies 165.00 Meeling/Tralning Expense Reimbursement
84057 John DulMghan 20.00 Meeting/Training Expense Relmbursemenl
M058 Mike J.Henera 714.86 Meetingffmining Expanse Reimbursement
84059 Dean R.Karats 43.00 Meating/Tralning Expense Reimbursement
84060 Paul Loehr 18.87 MeeOnpR/alning Expense Reimbursement
84061 Robert D.Michaels 1,D88.60 Meeting7Training Expense Reimbursement
U062 Anthony P.Monary 71016 MeetingRnining Expense Reimbursement
84063 Subash Mysore 107.00 MeelingRmining Expense Reimbursement
M064 Jagadish C.Omgantl 99.00 Meeling/Tralning Expense Reimbursement
84065 John W.Swindler 122.66 Meedng7Treining Expense Reimbursement
M VeplweNE%CELdrN PS.RE\Cla xPaq Rax, . TCWime Pad RvPn-69dId5 EXHIBIT
1 10& Page 10 of 11 w121l0p8
Claims Paid From 08/16106 to O11p1Ne
Warrant No. Venda, Amount Description
84066 South Creep Air Qua0ty Management Dist. 336.46 Odor Control System at Weslalde Pump Slallon 3-52
84067 Orlando A.Tessin 62.00 MeelingRmining Expense Reimbursement
84068 Bobby L.Uneell 62.00 Meating/Tralning Expense Reimbursement
84069 Joanne Ward 72.00 Meeting/Training Expense Reimbursement
U070 Paul Ward 748.7E McMing/Tralning Expense Reimbursement
84071 Bryan Wills 231.77 Meeting/rmining Expense Reimbursement
84072 City of Fountain Valley 1,071.64 Permit Fee P1.102
84073 County of Orange Auditor Controller 225.00 Administrator,Fee-Adjustments to Property Tax BBB
84074 County of Orange Auditor Controller 315.OD Administrative Fee-Adjustments to Property Tax Bills
$4075 Michael Ford 1,163.84 Reconciliation User Fee Refund Program
84076 Dorothy Schultz 1,595.33 Recuncilrstion User Fee Refund Program
84077 South Coast Air Quality Management Dist. 1,695.47 Odor Control System at Ellis Pump Station J-714
Total Accounts Payable-Wamnts S 19,807,929.79
Payroll Disbursements
33899 - 34074 Employee Paychecks $ 128,411.50 Biweekly Payroll-OB/16N6
U080 - 346131 Employee Paychecks 96,759.25 Interim Payroll-ReissuesBReno Range Adjustments-OW17106.08aMll'
34662 - 34740 Employee Paychecks 143,032.88 Bleveeky Payroll-0W30M
34741 - 347M Employee Paychecks 4.884.59 Interim Payroll-08/24N8
129517 - 130070 Direct Deposit Statements 1,151,582.21 Bhveeky Payroll 08116106
130071 - 130624 Direct Deposit Statements 1.214.120.86 Biweekly Pm moll 08MOM6
Total Payroll Disbursements S 2,738,791,28
'PnnW Mal bMr lua b Mxim gynllMarlLS
Wire Transfer Pavlrmnts
OCSD Payroll Taxes 8 Contributions S 750.220.73 Biweekly Payroll 08116N6
US SD Payroll Taxes O Contributions 7M4.56.73 SeriBiweekly Payroll UBpONB
US Bank 554.583.70 Series 2000 A 8 B ReruMing COPa August Interest Payment
TeMI Wire Trans/or Payments S 1,882,884.0E
Total Claim Paid 08118108.08131N6 $ 24,508,685.18
H IdeddavAEXCEL E ae "PSHAREICW,ms Pod RoMom-OTCYims Pod Repan-OaJI-05 EXHIBIT
lirl11N4 Page 11 of 11 1r12Q006
PDC COMMITTEE M-11ns Date To06.urDr.
I 09/14/06 10/25/06
'Y• AGENDA REPORT tten NUMter Item Number
PDO06-86 Re-
Orange County Sanitation District
®Utility Systems
FROM: David Ludwin, Director of Engineering
Originator: Christopher MacLeod, Project Manager
SUBJECT: PLANT 1, UNDERGROUND STORAGE TANK REHABILITATION AT
CENGEN BUILDING, JOB NO. FE05-32
GENERAL MANAGER'S RECOMMENDATION
(1) Ratify Change Order No. 1 to Plant 1, Underground Storage Tank Rehabilitation at
Cengen Building, Job No. FE05-32, with Fleming Environmental, Inc., authorizing an
addition of$33,570 and 181 additional days, increasing the total contact amount to
$145,030 and 231 days; and (2) Accept Plant 1, Underground Storage Tank
Rehabilitation at Cengen Building, Job No. FE05-32, as complete, authorizing execution
of the Notice of Completion and approving the Final Closeout Agreement with Fleming
Environmental, Inc.
SUMMARY
• The project rehabilitated a 12,000 gallon capacity, double wall, lube oil underground
storage tank (Tank No. 11), and a 2,000 gallon capacity waste oil underground
storage tank (Tank No. 12) located adjacent to the CenGen Building at Plant No. 1.
The work was done at the direction of the Orange County Health Care Agency
(OCHCA). All related underground piping and accessories for Tanks 11 and 12
were replaced and approved for SB 989 testing including the Veeder Root
monitoring system.
• Staff prepared the plans and specifications and the contract was awarded to
Fleming Environmental, Inc. on December 7, 2005.
• Change Order No. 1 includes three items of added work and a time extension.
There are no reimbursable or nonreimbursable design errors associated with this
change order. The contract does include liquidated damages of$500 dollars per
day, however no liquidated damages are assessed and there are no bonus
provisions. The project is now 100% complete.
PRIOR COMMITTEEIBOARD ACTIONS
The contract was awarded by the PDC Committee on December 7, 2005. Please refer
to the attached Change Order Status Report for information on all previous change
orders.
Page 1
PROJECT/CONTRACT COST SUMMARY +
Original Contract Price $111,460 ,l
Previously Authorized Change Order $ .00
This Change Order (Add) $ 33,570
Change Orders to Date $ 33,570
Percent Increase to Date 30.12%
Amended Contract Price $ 145,030
BUDGETIMPACT
® This item has been budgeted. (Line item: FY2005-2006 Budget Section 8, P110)
❑ This item has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Contact Schedule
Contact start date December 7, 2005
Original contact completion date January 25, 2006
Total number of change orders to date 1
Current contact completion date July 25, 2006
Days subject to liquidated damages 0
Change Order No. 1 Content
Item Description Amount Days Type
1 Overfill Veeder-Root Alarm $7,909 17 Staff Requested Design
Enhancement
2 Removal of Concrete $10,204 20 Unknown Condition
Ductbank and Miscellaneous
Fieldwork
3 The Lube Oil Tank Flushing $15,457 12 Staff Requested Design
Change
4 Contract Loop Tag Equipment $0 132 Other
and Wire Tag Numbers Delay
Total Change Order No. 1 $33,570 181
Page 2
Item 4 involves a time extension of 132 calendar days to the contract. The original
contract plans and specifications contained approximately 60 loop tag equipment and
wire tag numbers. The specified tag numbers were changed to coordinate with new
Sanitation District standards which changed during the construction phase of this
project. Several meetings were required to resolve this problem. The project was
essentially completed on June 19, 2006. The tag number revisions were a very small
part of the contract work but delayed the final contract completion. This is a no cost
item. The Contractor has agreed not to seek any extended overhead costs associated
with this delay and the Sanitation District has agreed not to seek liquidated damages on
this contract.
ALTERNATIVES
N/A
CEQA FINDINGS
Exempt
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order
5. Location Description of Change Order
DR:dm
H:1nlgbbaMgenda Dmft Rep MsVDMFEOS32 AR CO 01 Og 7Mdw
Page 3
BUDGET INFORMATION TABLE
PLANT 1, UNDERGROUND STORAGE TANK REHABILITATION AT CENGEN BUILDING, JOB NO. FE05-32
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
(DECREASE
Phase 1-Project Development
s - $ - a - $ $ - s - s - a
Phase 2 Preliminary Design $ S b 5 $ $ $ It
Phase 3-Design $ 19.080 S 19,030 $ 23,493 $ 42,523 $ 19.030 $ 23,493 $ 42,523 $ 42,523 100%
Phase 4-Constructon
$ 87,880 $ 156.140 $ 33,570 $ 189210 $ 156 140 $ 33,570 $ 189,710 $ 151,835 80%
Phase 5-Commissioning $ - $ a - $ - $ - $
Phase 6-Close-Out
$ 720 $ - $ - $ 3 - $ - S - $
Phase I-Contingency $ 11,250 S 12,500 8 12,500 8
PROJECT TOTAL
$ 118,930 S 187,670 $ 44,563 $ 232233 $ 1]5,1]0 $ 57,053 It 232,233 a 194,358 84%
Reimbursable Casts
PROJECT NET $ 118.930 1 $ 187.670 1 $ 44.563 1 $ 232233 S 175.170 $ 57,063 5 232,233 $ 194,358 84%
PSAIContraet
"Dealgn PSA $ $ $ 8 S $ $ $
Construction Contract is 75,000 1$ 125,000 1 $ 20,030 1 $ 145,030 11$ 111,460 1 $ 33.570 1 S 145,030 1 $ �11160 T]%
"In-House Design
EDMS 0038120e9
CHANGE ORDER STATUS REPORT
Plant No. 1, Underground Storage Tank Rehabilitation at Cengen Building
JOB NO. FEDS-32
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(DAYS) (DAYS)
CONTRACT 1277/2005 $111,460 $111,460 N/A 50 50
CO NO t R1=N6ING' $33,57U $145.030 30.12%�'�� 1163 a � . _...i . Al
EDMS003810996
CHANGE ORDER PERFORMANCE REPORT
PLANT 1,UNDERGROUND STORAGE TANK REHABILITATION AT CENGEN BUILDING
JOB NO.FE05.32,CHANGE ORDER NO.1
Contractor:FLEMING ENVIRONMENTAL,INC. Pr*d Category:REHABILITATION
Design Consultant:STAFF Contract%Complete:100% Original Conlrad Price: 3111,450
CHANGE ORDER TYPES TRACKED INFORMATION ONLY
Relmb..Me Design Nan-Ralmbunsble Subtotal COTypn
Unbnown Condition StallRpwaledCNnge Errors Design Erma Traeba, Other Tptal
Change Orden $10,204 9.15 $23,355 20.96% SO 0.00% $0 0.00% $33,570 30.12 $0 0.00% $33,57 30.1
this Period
Change Orden to gg 0.00% $0 0.00% $0 0.00% $0 0.00% $0 0.00% $0 0.00% $0 0.00%
Change Order ToMl $10,204 9.15% $23.366 20.96% $0 0.00% $0 0.D0% $33,570 30.12% $0 0.00% $33.570 30.12%
Program <3.00% <1.00% 0.00% <1.00% <5.00% 0.00% <5.00%
PeIF.. C.Goals
1 The CMnee Order Menegemml Plan iradm tlN preceding bur chsnge atlarrypes
Version 3I1200S
EOMS DEQ511167
Page 1 of 4
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Fleming Environmental, Inc C.O. No.: One i
Date: September 27, 2006
Job: Underground Storage Tank Rehabilitation at
Cengen Building, Job No. FE05-32
Consultant: In-House Staff
Amount of this Change Order(Add) $33,570.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation,the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 - OVERFILL VEEDER-ROOT ALARM
This item is for labor, materials,and equipment to install one new overfill Veeder-Root alarm to
monitor the lube oil tank level. The Contractor was directed to install new cabling in existing cable
trays, new switches, new wire, additional programming, and testing of the Veeder-Root System. The
overfill alarm was not shown in the contract documents but was needed as a safety device to prevent
a potential spill. O&M staff requested because this is a lube-oil tank. Staff later determined that the
overfill alarm should be installed on the Tube oil tank to provide a complete and safe operating system
complying with Orange County Health Care Agency (OCHCA). The work associated with this change
order item was accomplished by the Contractor's force account in accordance with the General
Requirements, Section 43.A, (Reference FCO No. 1).
ADDED COST THIS CHANGE ORDER ITEM: $7,909.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 17 Calendar
Days
ITEM 2 -REMOVAL OF CONCRETE DUCTBANK AND MISCELLANEOUS FIELDWORK
This item is for labor, materials, and equipment to remove approximately 10 linear feet of concrete
reinforced piping located over the below grade fiberglass lube oil and waste oil tanks. This existing
reinforced concrete pipe was not shown in the facility as-built drawings. This item also includes
miscellaneous fieldwork for the installation of one corrosion protection flange gasket isolation kit for
the lube oil tank's inlet piping. This unknown condition was for an electrical heater installed previously
but not cathodically protected. This will insure the tank and its piping are electrically isolated from the
Cengen Building and to prevent future corrosion of the tank and its piping. The work associated with
this change order item was accomplished by the Contractor's force account in accordance with the
General Requirements, Section 43.A, (Reference FCO No. 2).
ADDED COST THIS CHANGE ORDER ITEM: $10,204.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 20 Calendar Days
Page 2 of 4
ORANGE COUNTY SANITATION DISTRICT
108"ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Fleming Environmental, Inc C.O. No.: One(1)
Date: September 27,2006
Job: Underground Storage Tank Rehabilitation at
Cengen Building,Job No. FE05-32
Consultant: In-House Staff
ITEM 3 -THE LURE OIL TANK FLUSHING
This gem is for labor, materials,and equipment to flush/circulate and filtering hot oil through
100-micron bag fillers in order to remove small debris from the lube oil tank's system. O&M staff
requested this work as a precaution to avoid any future damage to the Cengen generator's motors.
tank's pumping system. The new piping installed in the system could have contained small debris
from normal piping installation methods, which could have created significant damage to the engines.
The contract did not include any flushing requirements for the system. The work associated with this
change order item was accomplished by the Contractor's force account in accordance with the
General Requirements, Section 43.A, (Reference FCO No. 3).
ADDED COST THIS CHANGE ORDER ITEM: $15,457.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 12 Calendar Days
ITEM 4—CONTRACT LOOP TAG EQUIPMENT AND WIRE TAG NUMBERS DELAY
This Item involves a time extension change of an additional 132 calendar days to the contract. The
original contract plans and specifications contained approximately 50 to 60 loop tag equipment and
wire tag numbers. The specified tag numbers were changed to coordinate with new Sanitation District
Standards. This is a no cost change order. The Contractor has agreed not to seek any extended
overhead costs associated with this delay and the Sanitation District has agreed not to seek liquidated
damages on this contract. This item was negotiated with the Contractor in accordance with Div. 1 and
Section 43.13 of the General Requirements (Reference FCO No. 4).
ADDED COST THIS CHANGE ORDER ITEM: $0.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 132 Calendar
Days
TOTAL ADDED COST THIS CHANGE ORDER ITEM: $33,570.00
TOTAL TIME EXTENSION THIS CHANGE ORDER ITEM: 181 Calendar Days
C
Page 3 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Fleming Environmental, Inc C.O. No.: One 1
Date: September 27, 2006
Job: Underground Storage Tank Rehabilitation at
Cengen Building, Job No. FE05-32
Consultant: In-House Staff
The additional work contained within this change order can be performed incidental to the prime work
and within the time allotted for the original contract and any extensions to the contract time made by
and all previously issued change orders. It is therefore mutually agreed that a 181 day extension of
time to perform the work is required for this change order, and no direct or indirect, incidental or
consequential costs, expenses, losses or damages have been or will be incurred by Contractor,
except as expressly granted and approved by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Date: December 7,2005
Original Contract Time: 50 Calendar Days
Original Completion Date: January 25,2006
Time Extension this C.O.: 181 Calendar Days
Total Contract Time Extension: 231 Calendar Days
Revised Final Completion Due Date: July 25, 2006
Time Subject to Liquidated Damages: NIA
Actual Final Completion Date: July 25, 2006
Original Contract Price $111,460.00
Prev. Authorized Changes $ .00
This Change (Add) $ 33,570.00
Amended Contract Price $145,030.00
Page 4 of 4
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Fleming Environmental, Inc C.O. No.: One 1
Date: September 27, 2006
Job: Underground Storage Tank Rehabilitation at
Cengen Building, Job No. FE05-32
Consultant: In-House Staff
Board Authorization Date: September 27,2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Tod Haynes, P.E. Date
Engineering and Construction Division Manager
Approved by:
David A. Ludwin P.E. Date
Director of Engineering
Accepted by:
FLEMING ENVIRONMENTAL,INC.
Contractor Date
EDM50038109M
BOARD OF DIRECTORS MeetlngDate TOBd.ofDir.
0/25106
AGENDA REPORT Item Number Iem Number
Bmt
Orange County Sanitation District
FROM: Lorenzo Tyner, Director of Finance
Originator: Michael D. White, Risk Manager
SUBJECT: SUMMONS & COMPLAINT RE BUTLER V. ORANGE COUNTY
SANITATION DISTRICT.
GENERAL MANAGER'S RECOMMENDATION
Receive and file summons and complaint re Butler v. Orange County Sanitation District,
Kings County Superior Court Case No. 06CO281, regarding the Petition for Prescriptive
Easement, and authorize General Counsel to appear and defend the interests of the
District.
SUMMARY
Please see attached memo dated 10/18/06 from General Counsel.
BUDGET IMPACT
❑ This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
ALTERNATIVES
CEQA FINDINGS
ATTACHMENTS
Memo from General Counsel.
LT:MW:BG
Page 1
MINUTES OF STEERING COMMITTEE MEETING
Orange County Sanitation District
Wednesday, September 27, 2006, at 5:30 p.m.
A meeting of the Steering Committee of the Orange County Sanitation District was
held on Wednesday, September 27,2006 at 5:30 p.m., in the Districts Administrative
Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS: STAFF PRESENT:
Directors Present: Jim Ruth, Interim General Manager
Jim Ferryman, Chair Bob Ghirelli,Acting Assistant General Manager
Doug Davert,Vice Chair Nick Amontes, Director of Regional Assets and
Carolyn Caveoche, Chair, OMITS Committee Services
Tod Ridgeway, Chairman, PDC Committee Jim Herberg, Director of Operations and
Darryl Miller, Chairman, FAHR Committee Maintenance
Jim Silva, County Supervisor David Ludwin, Director of Engineering
Steve Anderson, Past Board Chair Lorenzo Tyner, Director of Finance and
Administrative Services
Jim Burror, Engineering Supervisor
Directors Absent: Norbert Gala, Information Tech Analyst III
Michael Gold, Legislative Affairs Liaison
OTHERS PRESENT: John Linder, Engineering Manager
Bradley R. Hogin, General Counsel Juanita Skillman, Records Manager
Don Hughes Ryal Wheeler, Maintenance Supervisor
Gail Garrett, Committee Secretary
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were none.
(4) REPORT OF THE COMMITTEE CHAIR
Chair Ferryman reported on the status of the SARI line Memorandum of
Understanding (MOU)involving the five principal agencies (County of Orange [lead
agency], OCSD, SAWPA, OCWD, and Riverside County). It is scheduled for
consideration in October by the governing boards of each of the five agencies and our
October Steering and Board agenda for approval.
The MOU outlines roles and responsibilities for the design, construction, and
Minutes of the Steering Committee
Page 2
September 27, 2006
financing of the project and development of a financial plan to pay for the project.
The joint Policy Committee made up of board members and GMs of each of the
agencies will give policy direction and devise a financial plan;and the Technical
Committee will oversee and direct the technical work at the direction of the Policy
Committee
The principals will meet sometime in the next two weeks to begin discussions.
Chair Ferryman, Director Darryl Miller, General Manager Jim Ruth and Acting
General Manager Bob Ghirelli will attend.
• Chair Ferryman announced the upcoming committee meetings for October. A
workshop will be held on Wednesday, October 18 at 5 p.m. to discuss GM's
goals, as well as Board and Committee functions.
• A corporate table has been reserved at the 2007 Economic Forecast Conference
for Thursday, October 26, 2006 at the Hyatt Regency, in Irvine. Contact Gail
Garrett if you wish to attend.
(5) REPORT OF GENERAL MANAGER
a. Status Report
Interim General Manager Jim Ruth reviewed activities included in his September
Status Report.
• Bob Ghirelli has assumed his responsibilities as Acting Assistant General
Manager.
• The OCSD/OCWD Joint Campus report is scheduled for the October Steering
and Board.
• The first phase of mid-Management training has been completed.
• A draft document of the Succession Plan is being distributed for comment and
a report scheduled for the October FAHR Committee.
• Meetings with Union representatives have been scheduled to discuss time
frames for formal negotiations.
• The revised Nepotism policy is more comprehensive and defines the authority
of the General Manager. It was approved at the September FAHR Committee
meeting.
b. Lecislative Affairs
Michael Gold provided a legislative update on the Design-Build bill and outlined
the key elements of Bighorn decision.
• The Design-Build bill has died due to the inclusion of a provision by the
union. Mr. Gold said we can introduce a bill at the beginning of the 2007
Legislative Session which will probably pass quickly since the local unions
have already signed-off on the contracting and training provisions.
• One of the elements of the Big Hom decision is that water rates and sewer
charges are property related charges, therefore subject to Prop. 218's public
notice provision. Concern was voiced regarding the ramifications this decision
may have on District's budget timing. General Counsel was asked to provide a
report at the next meeting on possible timing ramifications.
Minutes of the Steering Committee
Page 3
September 27,2006
C. Interplant Gas Line Shutdown
Jim Herberg said the District interplant gas line does not meet Department of
Transportation (DOT) physical and administrative requirements. He
recommended decommissioning the line to get out of non-compliance with DOT
regulations. Mr. Herberg indicated that it would cost about$50,000 for a
contractor to perform work to decommission the line, and that preparation of
contract documents and bidding the work would extend our non-compliance by at
least three months. Therefore, in the interest of time, staff is recommending that
the work be contracted to Jamison Engineering as a sole-source. Jamison
Engineering has performed similar work on the gas line in the past and can
mobilize immediately.
Following a lengthy discussion re costs and possible consequences, Committee
members concurred with staffs recommendation to decommission the line now to
come into compliance with DOT requirements. While the line is out of service,
staff will assess whether to re-commission the line in the long-tens.
(6) REPORT OF GENERAL COUNSEL
In response to a request for clarification at the last month's meeting, General Counsel Brad
Hogin said that lobbyist contracts cannot be based on percentage.
(7) CONSENT CALENDAR ITEMS
a. The minutes of the August 23, 2006 Steering Committee meeting were approved as
drafted.
END OF CONSENT CALENDAR
(8) ACTION ITEMS
a. MOVED, SECONDED AND DULY CARRIED: Direct staff to proceed with
preparing California Environmental Quality Act documentation and conducting
necessary public meetings for the annexation of nine remaining islands within the
Orange County Sanitation District.
b. MOVED, SECONDED AND DULY CARRIED: Recommend to the Board of
Directors to adopt Resolution No. OCSD 06-21, Declaring Support of Proposition
1 E.
Directors Carolyn Cavecche and Doug Davert opposed.
(9) INFORMATIONAL ITEMS
a. The Agenda Items scheduled to be reviewed by the Board's working committees in
March were reviewed.
b. The agenda items scheduled to be presented to the Board at tonight's meeting were
reviewed.
Minutes of the Steering Committee
Page 4
September 27, 2006
(10) OTHER BUSINESS COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
David Ludwin, Director of Engineering, reported that the CIP review will be performed by the
American Society of Civil Engineers at a cost of$26,000. A report will be forthcoming by the end of
the year.
(11) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(12) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND/OR STAFF REPORT
There were none.
(13) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday,October 25, 2006 at 5 p.m. A
Legislative Goal Setting Workshop will be held prior to the Steering Committee meeting at 2:30 p.m.
The next Board Meeting is scheduled for Wednesday, October 25, 2006 at 7 p.m.
(14) CLOSED SESSION
There was no closed session.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 6:20 p.m.
Submitted by:
Gail Garrett
Steering Committee Secretary
NWeglxwrd'S4 CprurvllaMA03tWxggyb3M SC MvxRss 02YT 56ac
STEERING COMMITTEE maabneoate To atl.aDr.
10/25/2ooe 10/25/os
AGENDA REPORT Darn Number Item Number
6a 9b
Orange County Sanitation District
FROM: Robert P. Ghirelli, Acting Assistant General Manager
Originator: Michael Gold, Legislative Affairs Liaison
SUBJECT: Santa Ana River Interceptor(SARI) Line MOU
GENERAL MANAGER'S RECOMMENDATION
Approve Memorandum of Understanding (MOU) between the County of Orange, Orange
County Water District, Santa Ana Watershed Project Authority, Riverside County Flood Control
District and OCSD for the protection and relocation of the Santa Ana River Interceptor(SARI)
Line. The MOU has been approved as to form, by the General Counsel.
SUMMARY
Background
The Santa Ana River Interceptor(SARI) Line is a sanitary sewer line that runs from the Inland
Empire to OCSD's treatment plant in Huntington Beach. When originally constructed, the SARI
was placed 20 feet below the Santa Ana River's bed; however, over time, with soil erosion, the
SARI Line is exposed in some locations and the amount of cover reduced. A four-mile segment
of the SARI, paralleling SR-91 between the Riverside/San Bernardino County lines and SAVI
Ranch in Anaheim Hills suffered the greatest amount of erosion and must be relocated.
Why is this an issue?
With significant erosion of the soil over the SARI Line comes a greater risk of damaging the line
and possible breakage, resulting in raw sewage running down the Santa Ana River and into the
ocean. Adding to the urgency of the SARI is the construction of the Prado Dam project by
Orange County Flood Control (OCFCD). By raising the height of Prado Dam, OCFCD will be
more than tripling the amount of flow down the Santa Ana River during heavy storms. With
increased flows, more soil erosion occurs which increases chances of damaging the SARI Line.
Multiple agency concerns
Orange County Sanitation District (OCSD) owns the SARI line, while OCFCD is responsible for
mitigating the damages to the SARI line from the Prado Dam improvements. In addition, the
Santa Ana River Watershed Project Authority (SAWPA) owns the portion of the SARI line
outside Orange County and uses the line to send industrial and agricultural wastewater to be
treated by OCSD. All three agencies have a major stake ensuring the improvements to the
SARI line are carried out in a timely manner.
The need for an agreement between agencies
In early June, the three lead agencies met to discuss various roles and responsibilities and felt
the best course of action would be a Memorandum of Understanding (MOU) between the
Form No.M-102 Agenda Repel—SC
bapt.$20 Rweed'. 1WI6120M
Page 1
r
parties defining respective responsibilities. The County of Orange has drafted the attached
MOU to spell out how the agencies would proceed in securing funding and relocating the SARI.
As the Steering Committee is aware, securing funding to relocate the SARI is one of OCSD's
top priorities.
Last July, the Steering Committee was presented with the draft MOU with suggested comments
from staff. At that time, staff sought direction from the Committee and received positive
feedback and suggestions for moving forward. Since that time, other agencies have given their
comments and the final draft is presented for your consideration.
What changes have taken place since June?
OCSD's comments focused on three major areas: Signatories to the Agreement, Relocation of
the SARI as top priority and not harming existing agreements.
Staff is pleased to report that for the most part, the comments suggested by OCSD were
incorporated into the final draft MOU.
The current signatories to the agreement include:
• The County of Orange(County)
• Orange County Water District(OCWD)
• Santa Ana River Watershed Project Authority (SAWPA)
• Riverside County Flood Control District(RCFCD)and
• OCSD.
The number of parties has expanded since the original MOU with the addition of RCFCD.
The MOU emphasizes that the SARI line should be relocated in a timely manner and using
State subvention funds is the preferred course of action.
Finally, the agreement was clarified so that no existing agreements are modified by this MOU
and OCSD retains responsibility over those aspects of the SARI it has historically controlled.
What's next?
The attached agreement is the final draft from the County of Orange and spells out the
responsibilities of each agency. Staff has thoroughly reviewed the MOU and the consensus is
that with the agreement in place there will be clear direction with respect to roles and
responsibilities.
The outstanding issue remains paying for the relocation of the SARI line. While the agreement
emphasizes using State subvention funds as the preferred course, the County of Orange has
not made a commitment to use its portion of the funds to pay for relocation. Moreover, the
Federal Water Resources Development Act(WRDA) that contains an authorization to spend
money relocating the SARI was stalled in Congress prior to their fall recess and will not be
considered until December(at the earliest).
Form No,M-102 Agenda Report-SC
Dane.320 RMeed: 10I162006
Page 2
ti
While the agreement does not bind any of the parties to spend money on relocation it does call
for cooperation among the parties to develop a cost sharing plan.
PRIOR COMMITTEE/BOARD ACTIONS
July 2006 Steering Committee submitted comments and recommended moving forward.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
❑ This Rem has been budgeted. (Line hem: )
❑ This Rem has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
® Not applicable (information Rem)
ADDITIONAL INFORMATION
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. MOU regarding the Santa Ana River Interceptor Line Realignment Design Project
Form NO.=-10f Age aReport-SC
Dept no RBAeeE: tOn62oW
Page 3
MEMORANDUM OF UNDERSTANDING
Santa Ana River Interceptor Line Realignment Design Project
This Memorandum of Understanding (MOU) sets forth the terms of agreement reached
among:
Orange County Flood Control District (OCFCD),
Orange County Sanitation District (OCSD),
Orange County Water District (OCWD),
Santa Ana Watershed Project Authority (SAWPA) and
Riverside County Flood Control and Water Conservation District
(RCFCWCD)
for the relocation and protection of the Santa Ana River Interceptor line (SARI).
Collectively, the signatories are referred to as "Agencies" or individually as "Agency."
A. WHEREAS, the SARI is a sanitary sewer line that conveys raw sewage
and brine (wastewater from agriculture, commercial and other sources)
from Orange County and the Inland Empire to OCSD's treatment plant in
Huntington Beach;
B. WHEREAS, OCSD owns and operates the SARI in Orange County, while
SAWPA owns and operates the SARI in Riverside County and San
Bernardino County. Both Agencies share responsibility for SARI
Operations & Maintenance costs;
C. WHEREAS, a segment of the SARI lies within the Santa Ana River
floodplain from approximately the San Bernardino/Riverside/Orange
County boundary line to the Savi Ranch ("Subject Reach") business
complex;
D. WHEREAS, constructed in the mid-1970s, the Subject Reach was
originally buried about 20 feet below the river bed and over time the
amount of soil cover over the Subject Reach has eroded and is now nearly
exposed in some locations;
E. WHEREAS, pursuant to the Joint Cooperation Agreement between
OCFCD, RCFCWCD, the San Bernardino County Flood Control District
and the Army Corps of Engineers each flood control district has agreed to
protect and relocate any utilities, including the SARI, required for the
Santa Ana River Mainstem Project as determined by the Corps of
Engineers.
F. WHEREAS, OCFCD in partnership with the U.S. Army Corps of Engineers
is raising the height of Prado Dam for increased Flood protection, including
construction of a new outlet works capable of allowing releases of up to
30,000 cubic feet per second;
G. WHEREAS, raising the Prado Dam height and completion of the Prado
Dam feature of the Santa Ana River Mainstem Project requires the
acquisition of right-of-way behind the dam;
H. WHEREAS, the decreased soil cover and exposure of the Subject Reach
in addition to the increased outlet flow from Prado Dam endangers the
SARI at the Subject Reach and necessitates the timely relocation or
protection of the SARI to avoid a major line break;
I. WHEREAS, the Agencies agree that using State subvention funds to
relocate the Subject Reach is the preferred course of action because it
gives OCFCD and RCFCWD control over the design and construction of
the project within their respective jurisdictions.
NOW THEREFORE BE IT RESOLVED that the Agencies believe it is mutually
beneficial to cooperate and to coordinate the expeditious completion of the Santa Ana
River Interceptor Line Realignment Project for the Subject Reach, which includes the
protection of the SARI by RCFCWCD within the County of Riverside ("Project"). The
purpose of this MOU is to define roles and responsibilities of each party in this
cooperative venture, as follows:
1. Coordination between Agencies:
(a) The Agencies agree to form an Executive Level Steering Committee
(Steering Committee) whose purpose is to provide policy guidance and
direction to the Project Working Group (described below). The Steering
Committee shall be comprised of each Agency's General Manager or
Chief Executive Officer ("CEO") and any other members appointed by
their governing board. The Steering Committee will meet quarterly and
the County of Orange CEO will be the Chair.
(b) The Agencies agree to form a Project Working Group (Working Group)
whose purpose will be to ensure satisfactory coordination between
Agencies. OCSD, OCWD, OCFCD, RCFCWCD and SAWPA agree to
each appoint a member to the Working Group who will act as the main
point of contact for each agency for the Project. OCFCD's member will be
the Chair. The Working Group will meet on a monthly basis or more
frequently as needed.
2. Coordination with Federal and State Government:
(a) OCFCD will be the lead Agency for all coordination with the Corps of
Engineers for the Subject Reach Project within Orange County.
2of5
(b) OCFCD will be the lead Agency for communication with Congressional
Members for federal legislative requests.
(c) RCFCWCD will be the lead Agency for coordination of work with the
Corps of Engineers for that portion of the SARI being protected within
Riverside County.
(d) The Agencies agree to support legislation as required to include the SARI
as part of the Santa Ana River Mainstem Project and maximize available
funding from Federal and State sources.
3. Financing:
(a) Each Agency shall bear its own costs and expenses for participating in the
cooperative preconstruction efforts and tasks required by this MOU.
(b) The Agencies will work cooperatively to develop an equitable cost sharing
strategy for the Project. The Agencies will support the appropriation of
State Subvention Funds for the purpose of reimbursing eligible costs for
the Project and the Santa Ana River Mainstem Project.
(c) OCFCD will act as lead Agency for coordination with the State Department
of Water Resources (DWR) and submittal of Subvention funding claims to
the DWR for that portion of the project within Orange County.
(d) RCFCWCD will act as the lead Agency for coordination with the DWR and
submittal of Subvention Funding Claims to the DWR for that portion of the
SARI being protected within Riverside County.
4. Agreements:
The Agencies agree that they will cooperate with each other in the preparation of
a cost sharing agreement prior to advertisement of bids.
5. Planning, Engineering & Design:
(a) OCFCD will act as lead Agency for managing the preparation of the
EIR/EIS required engineering, design and preparation of plans and
specifications for the portion within Orange County and RCFCWCD will do
the same for that portion within Riverside County.
(b) OCSD will establish design criteria and review and approve the final plans
for the portion of the SARI in Orange County. SAWPA will establish
design criteria and review and approve the final plans for the portion of the
SARI in Riverside County.
(c) OCFCD will act as lead Agency for CEQA purposes for the project within
Orange County and RCFCWCD will act as lead Agency for CEQA
purposes for the project within Riverside County.
3 of 5
6. Permits and other Approvals:
(a) OCFCD will be the lead Agency for obtaining all permits and other
approvals required for the Subject Reach within Orange County.
(b) OCFCD will be lead Agency for preparing reports, engineering, etc. as
required to obtain approval from Caltrans for Subject Reach.
(c) RCFCWCD will be the lead Agency for obtaining all permits and other
approvals required for the SARI protection work located within Riverside
County.
7. Rights-of-Way:
The Agencies will cooperate in the conveyance and abandonment of
easement rights to accommodate Project needs.
8. Construction and Maintenance:
(a) Based upon plans approved by both SAWPA and OCSD, OCFCD will
advertise, award and administer a construction contract for the Subject
Reach within Orange County and RCFCWCD will do the same for the
Project within Riverside County.
(b) Upon Completion of the Subject Reach within Orange County, OCSD will
retain ownership and accept responsibility for the maintenance and
protection of the newly protected and realigned Subject Reach in
accordance with an agreement with SAWPA that is yet to be drafted.
Upon completion of the Project within Riverside County, SAWPA will
retain ownership and accept responsibility for the maintenance and
protection of the newly protected Project within Riverside County in
accordance with an agreement With SAWPA that is yet to be drafted.
(c) Staff at SAWPA and OCSD will cooperate in preparing such an agreement
prior to commencement of construction.
9. Existing Agreements
This MOU is not intended to modify any existing agreements among the parties.
These agreements shall remain in full force and effect.
4 of 5
:l
IN WITNESS WHEREOF, each Agency hereto has executed this MOU by its duly
authorized representatives as of the dates set forth below.
ORANGE COUNTY FLOOD CONTROL DISTRICT
Date: By:
Thomas G. Mauk, County Executive Officer
ORANGE COUNTY SANITATION DISTRICT
Date: By:
Chairman, Board of Directors
ORANGE COUNTY WATER DISTRICT
Date: By:
General Manager
Date: SANTA ANA WATERSHED PROJECT AUTHORITY
By:
Chair
RIVERSIDE COUNTY FLOOD CONTROL and WATER
CONSERVATION DISTRICT
Date: By:
Dusty Williams, General Manager-Chief Engineer
5 of 5
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
Orange County Sanitation District
Wednesday, October 4, 2006 - 5:00 P.M.
A meeting of the Operations, Maintenance and Technical Services Committee of the Orange
County Sanitation District was held on October 4,2006, at 5:00 p.m. in the Sanitation District's
Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
OMTS Directors Present: Staff Present:
Don Bankhead, Vice Chair Jim Ruth, Interim General Manager
Sukhee Kang Nick Arhontes, Director of Reg. Assets& Services
Ken Parker Jim Herberg, Director of Operations & Maintenance
David Shawver Ed Torres, Acting Director of Technical Services
Dave Sullivan Lilia Kovac, Committee Secretary
James M. Ferryman, Board Chair Jeff Armstrong, Senior Scientist
Jeff Brown, Senior Engineer
OMTS Directors Absent: Carla Dillon, Engineering Supervisor
Mark Esquer, Engineering Manager
Carolyn Cavecche, Chair Mike Moore, Environmental Assessment Manager
Doug Davert, Board Vice Chair Robert Thompson, Process Controls Manager
Others:
Bob Bell, Maintenance Supervisor
Norbert Gaia, Information Tech Analyst
Juanita Skillman, Records Management Specialist
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Director Bankhead had no report.
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, had no report.
Minutes of the Operations, Maintenance
and Technical Services Committee
October 4, 2006
Page 2
(6) CONSENT CALENDAR ITEMS
Consideration of motion to approve all agenda items appearing on the Consent Calendar not
specifically removed from same, as follows:
a. Approve minutes of the September 6, 2006 Operations, Maintenance and Technical
Services Committee meeting.
b. OMTS06-44 Receive and file Technical Services Monthly Report, which focuses on
regulatory biosolids and performance measures for the Technical
Services Department.
C. OMTS06-45 Receive and file Operations & Maintenance Monthly Report, which
focuses on compliance, financial data and performance measures for
Operations and Maintenance Department.
d. OMTSO6-46 Receive and file Regional Assets and Services Monthly Report, which
focuses on current business Information, performance trends and
financial information of the business units.
e. OMTSO6-47 Receive and file Information Technology Quarterly Report,which focuses on
current performance trends and key technology business applications.
f. OMTSO6-48 Recommend to the Board of Directors to receive and file Collection
facilities O&M Division— Business Practices Reinvention Effort Report
dated September 2006.
g. OMTSO6-49 Recommend to the Board of Directors to approve a Consulting Services
Agreement with Black&Veatch for the Ocean Outfall Booster Station
(OOBS) Rehabilitation Assessment Study, Job No. J-99, for an amount
not to exceed $175,002.
h. OMTSO6-50 Recommend to the Board of Directors to approve Change Order No. 1 to
Purchase Order No. 102354 OB for purchase of Ferric Chloride,
Specification No. C-2005-247, issued to Kemiron Pacific,for a unit price
increase of$76.20 per dry ton for ferric chloride, increasing the total price
to $434.00 per dry ton plus tax for an estimated amount of$3,255,000 for
the period December 1, 2006 through November 30, 2007.
Motion: Moved, seconded and duly carried to approve the recommended actions
for items specified as 6(a)through (h).
END OF CONSENT CALENDAR
Minutes of the Operations, Maintenance
and Technical Services Committee
October 4, 2006
Page 3
(7) ACTION ITEMS
a. OMTS06-51 Recommend to the Board of Directors to receive and file the 2006, 120-
inch and 78-inch Outfalls Inspection Report and 120"/78"Port Book
reports prepared by Undersea Graphics, dated June 20, 2006.
Mark Esquer narrated the findings of 10 diving days at 200 feet depth or
23 hours of inspection videotape Into a 4-1/2 minute video. Directors of
the committee requested a copy of the DVD.
Motion: It was moved, seconded and duly carded to recommend approval to the
Board of Directors.
b. OMTSO6-52 Recommend to the Board of Directors to approve the development and
implementation of a Compliance Program with the sanitary sewer system
Waste Discharge Requirements (WDR)as required statewide by State
Water Resources Control Board Order No. 2006-0003-DWO issued on
May 2, 2006.
Motion: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
(8) INFORMATIONAL ITEMS
a. OMTS06-53 Level of Service
Jim Herberg briefly reviewed the level of service the Sanitation District is
currently providing and is scheduled to provide for the public based on
state requirements and the level allowed by the approved budget.
b. OMTSO6-54 Odor Control Policy
Carla Dillon, Engineering Supervisor, presented the Odor Control
Strategic Initiative which included a brief review of the current odor control
facilities and impact to the neighboring areas. A proposed odor control
policy was discussed with additional capital improvements that would be
needed to implement the policy. Capital and operating costs were
presented. At the December OMITS and Board meeting, staff will be
recommending the adoption of the proposed odor control policy, as well
as the capital Improvements that would be necessary to implement the
policy.
C. OMTSO6-55 Research Program Strategic Initiative
Jeff Brown, Senior Engineer, presented the Research Program Strategic
Initiative based on the need to remain flexible, while efficiently
coordinating research efforts among the various District departments.
Minutes of the Operations, Maintenance
and Technical Services Committee
October 4, 2006
Page 4
The need for flexibility in funding was discussed due to discovery and the
nature of research. Staff will return to the Board in the future with a
recommendation for funding flexibility.
d. OMTS06-56 Effectiveness of the Ocean Monitoring Vessel MN Nerissa
Mike Moore presented a report on the current use of the Sanitation
District-owned vessel used for all ocean monitoring reporting, as required
to remain compliant with the ocean discharge permit.
(9) REPORT OF DIRECTOR OF INFORMATION TECHNOLOGY
Director of Information Technology, Patrick Miles, reported that proposals were currently being
evaluated and recommendations were scheduled to be presented to the committee for contract
award for the Strategic Plan process. He also reported that timekeeping software approved last
year, has been tested and will be rolled out to the different departments in the next four months.
(10) REPORT OF DIRECTOR OF OPERATIONS AND MAINTENANCE
Jim Herberg reported that it has been determined that the inter-plant digester gas line is not in
full compliance with DOT regulations, and therefore will be decommissioned. The decommis-
sioning of this line was being awarded to Jamison Engineering, in the interest of time, as a sole-
source award to abandon the line immediately to reduce the Sanitation District's risk of non-
compliance. The work is estimated to cost approximately $50,000.
(11) REPORT OF DIRECTOR OF TECHNICAL SERVICES
Ed Tones,Acting Director of Technical Services, reported briefly that the April 29' discharge to
the 78"outfall during a repair of the 120"ouffall was considered by the Regional Board to be
preventable; thus, there is the possibility that the Sanitation District will receive an administrative
civil liability. He also reported that the National Drug Control Agency has requested the
Sanitation District participate in a study to sample influents of our two treatment plants to identify
the presence of cocaine usage in large urban areas.
(12) REPORT OF DIRECTOR OF REGIONAL ASSETS AND SERVICES
Nick Amontes reported that the Sanitation District provided database information and map to
the Grand Jury on septic tanks located in County of Orange. A meeting is scheduled on
October 300 to review watershed issues.
(13) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
None,
Minutes of the Operations, Maintenance
and Technical Services Committee
October 4, 2006
Page 5
(14) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
None.
(15) FUTURE MEETING DATES
The next Operations, Maintenance and Technical Services Committee meeting is scheduled for
November 1, 2006, at 5:00 p.m.
(16) CLOSED SESSION
There was no closed session
(17) ADJOURNMENT
The Chair declared the meeting adjourned at 6:50 p.m.
Submitted by:
Lilia Kovac
Committee Secretary
Operations, Maintenance and Technical Services
OMTS COMMITTEE Me dng Date To Bd.of dr.
10/4/06 10/25/06
i AGENDA REPORT ttem Number Item Number
OMTS0648 10(b)
Orange County Sanitatlon District
FROM: Nick Arhontes, Director, Regional Assets & Services Department
SUBJECT: COLLECTION FACILITIES O&M DIVISION - BUSINESS PRACTICES
REINVENTION EFFORT REPORT
GENERAL MANAGER'S RECOMMENDATION
Receive and file Collection Facilities O&M Division — Business Practices Reinvention
Effort Report dated September 2006.
SUMMARY
Beginning in July 1998, as an organizational priority after workforce downsizing, OCSD
engaged in the District Assessment and Reinvention Team (DART) process. The
DART work component primarily focused on the maintenance program in the process
areas of the treatment facilities. The numerous operational and maintenance activities
were reviewed and modified, procurement processes were enhanced, and work
management processes were documented and changed to improve the planning,
accuracy, and efficiency of the work and its financial history.
With the initial DART work in its final stages, concluding with a report on September 3,
2003, the DART effort was formally sunsetted by executive management and a new
project was allowed to proceed focusing on the collection facilities assets and their
related operations and maintenance program. Board support to proceed with a
consultant-facilitated, divisional staff-driven effort was approved on September 24, 2003
and work began thru staff teams. Staff s work with the consultant concluded on June
30, 2006 as planned.
The staff report on the Collection Facilities 0&M Business Practices Reinvention Effort
Report is the culmination of that effort. The various site specific detailed products
developed and implemented reside in the computerized maintenance management
system (CMMS) as well in electronic form on the OCSD computer servers for use and
future revision by staff when indicated. The report will be shared with staff in agencies
locally, regionally, and nationally as it is an important work effort and may serve as an
example for others considering changes to their work practices. Our outcome is a
better planned and scheduled work environment which seeks to reduce the labor
components of the site specific work. The effort is also well aligned with the agency
wide Asset Management Program.
PRIOR COMMITTEE/BOARD ACTIONS
OMTS03-40 CONSULTANT SERVICES WITH LINJER INC. approved on 9/3/03 which
initiated the current agreement and OMTS0546 EXTENSION OF CONSULTANT
SERVICES WITH LINJER INC. on 9/7/05
Form No.ow.luz2 rgxa.Repwl-ores
0.p1.920 RevifaG. 10I1 YIOCb
Page 1
PROJECT/CONTRACT COST SUMMARY r
N/A
BUDGETIMPACT
® This item has been budgeted. (Line item: prior years operating budgets for services)
❑ This item has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
ALTERNATIVES
NIA
CEQA FINDINGS
Was not applicable for this type of work
ATTACHMENTS
Staff Report- BUSINESS PRACTICES REINVENTION EFFORT by the COLLECTION
FACILITIES O&M DIVISION (420) of the Orange County Sanitation District's Regional
Assets and Services Department—20 pages, dated September 2006.
NJA:pe
H) ept'agenda\OMTS120W I006%06.06-48.Reinwntion Effon-im
FOIIII NO.O'NIO32 Agwn Re -OWS
eWI]A Rwiae]. INlfi'M5
Page 2
Staff Report
Business Practices Reinvention Effort
by the
Collection Facilities O&M Division (420)
of the
Orange County Sanitation District's
Regional Assets and Services Department
September 2006
4oJN11 SAWTgT oy
� s
= 9
c
¢ � o
4 h
9ol�cT/h� THE
v September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Table of Contents
Introduction...................................................................................................................................1
Acknowledgements.........................................................._.......................................................1
Background...............................................................................................................................1
Purpose of the Division 420 Reinvention Project......................................................................2
Collection Facilities O&M Maintenance Program Assessment.....................................................3
Assessment of the Existing Maintenance Program Business and Work Pracum...................3
"Best Appropriate Practices. .....................................................................................................4
Conductingthe Gap Analysis....................................................................................................4
Project Scope Development.........................................................................................................5
ProjectPlanning........................................................................................................................5
Division 420 Reinvention Project Planning Process..................................................................5
Reinvention Project Implementation .............................................................................................6
Asset Management Practices(Maintenance Component)........................................................6
Maintenance Strategy (Maintenance Task Analysis)................................................................7
Asset Failure Mode Identification and Evaluation Process Diagram.........................................8
Maintenance Task Supporting Documentation and Parts Requirements................................10
Maintenance Workflow Management......................................................................................11
Inventory Management and Procurement Practices...............................................................12
Financial Data Collection and Management............................................................................12
Performance Management and Reporting ..............................................................................12
Performance Categories .........................................................................................................13
Performance Measures...........................................................................................................14
PerformanceReports..............................................................................................................14
SpecialProjects..........................................................................................................................15
Engineering Document Change Management........................................................................15
Dig Alert Program Development and Implementation.............................................................15
Land Record Document Program Assessment.......................................................................15
Project Analysis and Findings.....................................................................................................15
Divisional Resource Analysis..................................................................................................15
Maintenance Organizational Structure....................................................................................16
Continuous Improvement of the Maintenance Program.............................................................16
Appendix.....................................................................................................................................17
Acronyms And Abbreviations..................................................................................................17
OCSDTrunk Sewers...............................................................................................................18
Collection Facilities O&M—Division 420 Organization Chart................................................19
OCSDOrganization Chart.......................................................................................................20
September 26, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Introduction
This report is a summary of the Work Practices Reinvention Effort conducted by the
Orange County Sanitation District(OCSD) Collection Facilities O&M Division (420) of the
Regional Assets and Services(RA&S) Department. This was a broad-based effort that
reviewed, assessed, and where appropriate, modified the asset management and
workflow management business and work practices for the division. OCSD staff has
implemented this effort, in conjunction with special projects identified by management as
needed additions to the work effort.
Acknowledgements
This project involved staff from virtually every OCSD department. The teams composed
personnel from Engineering, Finance, Information Technology, Operations and
Maintenance and Regional Assets and Services. The following is a list of the teams and
work groups that were responsible for implementing the various project work
components:
• The Collection System Gravity Sewers O&M Team—Division 420
• The CCTV Program Development and Implementation Team—Divisions 410 and
420
• The Manhole Inspection Program Development and Implementation Team—
Divisions 410, 420 and 740
• The Collection System Task Development Team—Division 420
• The Pump Station Team—Division 420
• The Engineering Data Management Group—Division 740
• The CMMS Support Group—Division 850 (with 420 support)
• The Land Record Document Program Assessment Team—Divisions 420,434,
740
• The Dig Alert Program Development and Implementation Team—Divisions 410
and 420
• The Maintenance Task Analysis Development and Implementation Team—
Division 420
• Warehouse& Purchasing and Planning & Scheduling Team—Divisions 230,420
and 850
Background
Beginning in July 1998, as a follow-up to concems regarding completeness, OCSD
began what was called the District Assessment and Reinvention Team (DART) process.
The initial DART effort focused on the maintenance program for the process areas of the
treatment facilities. As a result, maintenance activifies were reviewed and modified,
procurement processes were enhanced, and work management processes were
documented and changed to improve the accuracy of the work, including the financial
history of the treatment process facilities.
1
September 25, 2006 °
420 BUSINESS PRACTICES REINVENTION REPORT
The initial DART process concluded with a report to the Board on September 3, 2003,
after which the original DART effort for the treatment process facilities was sunselted by
executive management. The Board of Directors authorized Division 420 to start a new
project focusing on the collection system assets and its maintenance program when they
approved a consultant-facilitated, staff-driven effort on September 24,2003,thru Agenda
Report OMTS03-40, and further,thru Agenda Report OMT805-46 on September 28,
2005.
Purpose of the Division 420 Reinvention Project
The purpose of the Division 420 Reinvention Project was to ensure that the basic
business and work practices implemented for maintaining the treatment facilities were
also used to improve the management of the maintenance program for the collection
system assets. The intent was to provide continuity in both maintenance programs.
Furthermore, we wanted to ensure that information associated with each collection
system asset is managed for the benefit of the OCSD personnel caring for these assets
and, eventually, provided as a template to OCSD member cities and agencies for their
information and possible use.
This project was also aligned with other staff responsibilities to comply with the
requirements of the Santa Ana Regional Water Quality Control Board's General Waste
Discharge Requirements (WDR) Order No. RB-2002-0014, dated April 26, 2002. The
WDR was promulgated to reduce sanitary sewer overflows(SSOs), and improve the
capacity, operations and maintenance of wastewater collection systems covered in the
Order by ensuring that adequate funding was available and that management systems
were in place. Final deliverables required by the Order were shipped in September
2005.
The existing maintenance program,while functional and adequate to support OCSD
collection system assets, was reviewed under the requirements of the WDR Order to
ensure that the new program met all of the new WOR requirements and to support any
remaining work in progress.
OCSD submitted the final WDR deliverable, the Sewer System Management Plan
(SSMP), on September 30, 2005, and the overall WDR effort was substantially
completed in June 2006. The following are examples of two major provisions and
requirements of the Region 8 WDR Order:
"The discharger shall properly fund, manage, operate and maintain,with
adequately trained staff and/or contractors possessing adequate knowledge skills
and abilities as demonstrated through a validated program at all times, all parts
of the sewage collection system owned and/or operated by the discharger.
and;
The discharger shall develop and implement a written plan, a Sewer System
Management Plan (SSMP), for compliance with these waste discharge
requirements and make it available to any member of the public upon request in
writing."
2
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Collection Facilities O&M Maintenance Program Assessment
Assessment of the Existing Maintenance Program Business and Work
Practices
The initial phase of the project focused on obtaining input from other OCSD divisions on
their assessment of the existing business and work practices of the collection system
O&M program. The division teams reviewed the original project elements contained in
the project Agenda Report (AR OMTS03-40)to validate their completeness and
alignment with the following project objectives:
• Collection system asset identification and inventory documentation
• Review existing and/or develop and implement new computerized maintenance
management documentation standards
• Conduct a Maintenance Task Analysis(MTA) of OCSD's pump/lift stations to
ensure the appropriate activities are scheduled and staff resources are available
to property maintain them
• Develop a methodology for estimating scheduled maintenance intervals and
task-time estimates for the planned maintenance activities that will support
ongoing monitoring of departmental,work group and individual work performance
• Review existing, and/or develop and implement planned and unplanned
maintenance programs for the collection system
• Review and/or modify the existing trouble spot, siphon, and regional and local
sewer system line-cleaning tasks
• Review existing, and/or develop and document the various nondestructive testing
and inspection processes required to support the condition assessment process
of OCSD's equipment and components in the collection facilities
• Develop task descriptions for all the Collection Facilities O&M division's standard
corrective, preventive and condition assessment (predictive maintenance) tasks
• Develop a Business Risk Exposure Analysis(BREA) model for the gravity sewer
pipes in alignment with the Asset Management Program (a separate project)
• Review existing, and/or develop new maintenance policies and procedures
• Review existing and/or develop and implement a Performance Management
System
• Support staff in the development of a document change management process for
engineering-maintained record information systems that are accessed regularly
to support collection system and plant maintenance activities
• Develop and implement the Dig Alert System due to transfer of these
responsibilities from the Engineering department to the RA&S department
• Assess the existing Land Record Document program for maintaining surface
easements
The teams also held discussions with various maintenance and technical support
personnel as well as personnel from the various OCSD support groups, such as the
Instrumentation/Electrical and Control (I/E/C) maintenance technicians in the O&M
department. These staff members service(for overall efficiencies)the I/EtC equipment
in the treatment facilities and the collection system pumping facilities.
3
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
The staff interview process obtained general information about the day-today operation
and maintenance of the collection facilities, existing corporate knowledge, and reviewed
methods and practices used to procure maintenance materials, parts and services. The
inventory management and finance interviews focused on obtaining a general
understanding of OCSD's budget preparation and management process,the methods
and procedures used by Division 230 - Purchasing and the Warehouse, and the
processes used to manage and track financial information through the current Financial
Information System(FIS) and the Computerized Maintenance Management System
(CMMS).
"Best Appropriate Practices"
The second phase of the assessment process was to review the current state of the
collection facilities maintenance program, and based on those findings, determine the
"Best Appropriate Practices"that could be implemented to migrate the program to an
improved level of proactive maintenance.
The management of a typical service organization's physical assets often involves the
supervision of millions of dollars worth of assets. For example,the replacement value of
the collection facility assets is estimated at$3.05 billion for FY 2005/2006 whereas the
replacement value of the treatment and administration facilities is approximately $2.51
billion. The importance of properly managing and maintaining these assets on behalf of
our customers and ratepayers, particularly in the areas of level of service (LOS), cost of
service and business risk to the organization, should not be underestimated. "Best
appropriate practices"were chosen to be implemented to successfully address this
challenge. Applying best appropriate practices refers to delivering quality asset
management at a level that is best suited to meet the particular needs of an
organization. The best appropriate practices concept was applied to the following
maintenance areas:
Asset Knowledge
Accounting and Costing
Business Risk Assessment
Maintenance Work Planning and Resource Management
Organizational Structure
Concluctina the Gap Analysis
The best way to determine the appropriate life-cycle maintenance processes and
practices is to identify the gaps between the current practices and the desired practices
by staff associated with each functional assessment area. The gap between the existing
practice and each desired practice is then evaluated,the new tasks are identified and
the work packages are defined. The work packages are then prioritized and organized
into what are called implementation projects. Each project focuses on making the
necessary changes to the appropriate maintenance component of the asset
management process and the maintenance management program. The components
addressed by the assessment process included the following:
4
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
• Asset Management Practices (maintenance component)
• Maintenance Strategy
• Maintenance Workflow Management
• Inventory Management and Procurement Practices
• Financial Data Collection and Management
• Performance Measurement Management and Reporting
• Maintenance Organizational Structure
The assessment process provides the initial information necessary to make the right
recommendations to change the maintenance program where indicated. When these
recommendations are approved, they become the basis for the project planning process
to close the gaps indicated.
Example: When developing a particular maintenance strategy, the assessment process
identified the need for increased asset condition monitoring on specific types of assets,
such as degradation of manhole structures. The results from these activities were used
to improve day-today decision making for developing and scheduling speck
maintenance activities and to improve the quality of data transmitted for use in the
Capital Improvement Program (CIP) planning process. As a result, a project element
and the supporting work packages were put in place as part of the effort to develop and
implement a condition-assessment and condition data-management program for OCSD
collection facilities assets.
Project Scope Development
Project Planning
Each of the project elements contained in the original project scope, along with the
desired maintenance functions that were reviewed and assessed during the
maintenance program assessment process are an essential part of any successful
program plan. When the recommendations related to each maintenance function are
approved for implementation, they become the final project elements, and the Identified
work packages then define the major tasks to be completed for each project element to
help close gaps that may exist.
Division 420 Reinvention Project Planning Process
During the project planning process,the teams developed a project framework outline to
ensure that all project elements and associated work components were identified and
documented at the start. The outline was then expanded to represent the final scope of _
work. Once the scope of work was approved by division management, it was refined
into a comprehensive project plan that included the following:
• Definitions and descriptions of each project element to be performed
• Major work components to support each project element
• Mid-level task definitions for each work component
5
September 25, 2006 r
420 BUSINESS PRACTICES REINVENTION REPORT
• Definitions of skill sets required to complete the project
• Level-of-effort estimates to complete each major component of work desired by
staff
This information was then incorporated into a project schedule that encompassed
all of the available project Information to date to execute the implementation phase of the
project. Staff participated in all aspects of the work.
Reinvention Project Implementation
Asset Management Practices (Maintenance Component)
The Asset Management component was the initial work effort undertaken to implement
the project. This component consisted of the following major work elements or tasks:
1. Conduct an inventory of all dynamic and static assets located in the collection
system that are owned by OCSD or for which OCSD has legal responsibility.
Example: The first ever Trunk Sewer Mapping Project was implemented by
OCSD's Engineering Department to support the asset inventory component
of work for static assets located in the collection system. The project was
substantially complete in 2005.
2. Enter all inventory information into the CMMS.
Example: Each asset, such as a manhole, sewer line segment or sewage
pump is assigned a unique identifier and all its relevant attribute
information is collected and entered into the CMMS by various line or
support staff as part of the inventory component of work.
3. Reconcile the CMMS database to ensure that all standards developed during the
project have been appropriately applied. Examples are:
• Entering data
• Developing accurate asset descriptions, and
• Creating "parent to child" asset relationships to ensure that proper
financial and work-related roll up of maintenance information can be
accomplished, e.g., Pump System#1 and its motor, pump, valves,
driveshaft, etc, as one of the systems in the pump station.
4. Develop and implement a Geographical Information System (GIS)that manages
geospatial information on all OCSD collection system assets.
Example: OCSD Engineering Department staff,with support from
Information Technology personnel, developed and implemented a GIS
program to support the management of OCSD collection facility,treatment
facility, and non-process facility assets. The initial work completed as part
of the implementation will be expanded and improved over time with the
goal of providing OCSD personnel current and relative geospatial
information.
6
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
5. Define the asset condition assessment requirements to support the business
decisions of short-term repair and maintenance, and long-term renewal and
replacement of OCSD assets by staff or others thru operating or CIP budgets.
Example: The requirements-definition phase is the Initial step in the
development of the condition assessment program. The program details,
and task identification and implementation components of condition
assessment are carried out as part of the Maintenance Strategy component
through the execution of the Maintenance Task Analysis. Examples are
conditions of the manholes, line segments, pump systems, and pumping
facility building roof systems.
The completion of the asset inventory work component is the foundation upon which the
reliability focused maintenance task analysis can be performed.
Maintenance Strategy (Maintenance Task Analysis)
There are two key objectives to the management of any physical asset:
• The asset must be maintained to ensure reliable performance
• The asset may also need to be modified from time to time to extend its service
life, or be upgraded to meet new operational or maintenance criteria.
Any analysis must consider these two objectives. The result of the maintenance
analysis must ensure that all physical assets continue to meet the expected Level of
Service(LOS)originally intended by their end users. The analysis must also identify a
means to monitor the condition of each asset so that business-appropriate renewal
points can be planned over the life of the asset until it is replaced.
Effective and efficient maintenance resources must be applied to the most appropriate
task at the most opportune time. This state of maintenance is referred to as Reliability
Centered Maintenance (RCM) and is defined as"a process used to determine what must
be done to ensure that any physical asset continues to do what its users want it to do in
its present operating context."
Keep in mind that the maintenance task analysis is conducted to review the operating
context, and based on that context, defines the asset's function and potential failure
modes. The process determines it the identified failure modes can be cost-effectively
mitigated with a particular maintenance activity, or if the asset should be allowed to run
to failure, like waiting until a light bulb bums out before you replace it. If an asset is
identified that does not meet the operator's level-of-service expectations, it might be
appropriate to redesign the asset or replace it with an improved design.
The Maintenance Task Analysis embodies the Reliability Centered Maintenance (RCM)
process, which entails asking seven important questions about the asset or system
under review.
1. What are the functions and associated performance standards of the asset in its
present operating context?
7
September 25, 2006 r
420 BUSINESS PRACTICES REINVENTION REPORT
2. In what way does it or can it fail to fulfill its functions?
3. What causes each functional failure(failure modes)?
4. What happens(what are the effects)when each failure occurs?
5. In what way (what are the physical or environmental consequences) does each
failure matter?
* What can be done(predictive or preventive maintenance strategies)to predict or
prevent each failure?
?. What happens if a suitable proactive task cannot be found (should you redesign
or replace)?
The maintenance task analysis conducted with Division 420 staff at OCSD answered
these questions for each asset, or group of associated assets, to determine the
probability of failure, to determine the consequences of that failure to the agency, and to
assign the appropriate maintenance tasks for each asset. This decision making process
is generally defined in the following diagram:
Asset Failure Mode Identification and Evaluation Process Diagram
ASSET FAILURE MODE
IDENTIFICATION AND EVALUATION
PROCESS
F�ds�MaM
WxnRcalgn
bripw2 Ws
<rnwM Cm MF�wFM PrMM,w
Rweeyn men,�mnw
VERSION 2.1 JUNE 12.2006
The project team members assigned the following maintenance strategies to the various
approved tasks. The codes for the various approved tasks were selected from the
following list (a task example is provided for each code):
8
' September 26, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
• Preventive Maintenance(PM)—A condition-triggered or regularly scheduled
maintenance activity that is intended to ensure asset performance and reliability,
such as the replacement of pump parts prior to failure, or sewer line cleaning to
Gear blockages before they cause an SSO.
• Predictive Maintenance Condition Assessment(PD)—A condition-monitoring
task conducted to collect information that will be stored, reviewed, and used to
determine what corrective, preventive or reconditioning task needs to be
implemented, such as a manhole inspection to detect hydraulic performance
problems or corrosion, or a CCTV inspection of a sewer to discover operational
or structural condition problems, or vibration monitoring of a pump system to
determine bearing wear or imbalance.
• Periodic Calibration (CA)—A maintenance activity to ensure critical electrical and
instrumentation components are accurately measuring process variables so that
the automated control or data gathering systems they support as a part of
process controls are performing properly.
• Run to Failure(RTF)—A conscious decision by the team to continue operating
an asset or part until it fails because its failure has no significant consequences
to the process, or because the maintenance activity to mitigate a possible failure
is not cost-effective to implement. Examples are replacement of failed light
bulbs, sump pumps or other noncritical components that can be cost-effectively
changed out at failure without sacrificing process reliability.
• Redesign(RD)—The process whereby the team determines that they need to
redesign the asset to meet the required service level because no planned
maintenance activity can mitigate the identified failure or service conflict. An
example would be a process that originally required a pump capable of moving
900 gallons per minute(GPM) of sewage and now the process requires 1200
GPM of sewage to be moved due to increased capacity requirements due to
growth in the sewershed.
The Maintenance Task analysis procedure was performed on all existing pump station
and collection system gravity and pressure-sewer assets. The following criteria were
used to determine the interval for conducting each identified task and the estimated task
time for completing each task. Once a task is identified and justified, it needs to be
scheduled by some approved trigger. The triggers could be such things as run-time,
accumulated events (such as number of motor starts, calendar interval between
scheduled sewer cleaning), or be based on demands such as customer complaints or
condition assessment information.
A task time element was created for the estimated time it would take to complete each
task. The time is later adjusted by maintenance supervisors, as needed, based on
monitoring the actual time needed to complete the task by assigned field personnel.
Establishing Task Interval—The Maintenance Task Analysis (MTA) team determined
what the appropriate maintenance interval should be for each task using the best
information available and/or management objectives. The task interval was first
documented in number of weeks. If the interval was less than one week, then it was
9
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
documented in number of days. Maintenance tasks that were to be performed on
demand had no maintenance interval assigned.
Estimating Task Time—The MTA team estimated the task time for each created and
scheduled task. The estimated task time included travel time to and from the job site,
set-up time, and the time required to complete the task. Work activities were grouped by
location or region (as appropriate) to minimize overall task time since the OCSD service
area covers a 470 square mile area. Time estimates should be compared with actual
times on a going-forward basis so the appropriate adjustments can be made by
maintenance supervisors for updating the CMMS system.
Maintenance Task Supporting Documentation and Parts Requirements
For each PM, PD and CA task developed, supporting documentation needed to be
identified and developed by the appropriate team. The supporting documentation
included descriptions of the task to be preformed and important related safety
procedures, such as lock-out-tag-out(LOTO) or confined space entry permits required.
All managed non run-to-failure(RTF) assets and equipment were reviewed to ensure
that the appropriate parts were purchased and maintained in the warehouse inventory if
they were not readily available in the Orange County region.
Detailed Task Description—A simplified but appropriately detailed task description was
written for each developed and scheduled activity. The task descriptions were as
generic as possible to allow for their repetitive use on similar types of equipment and/or
maintenance tasks. If a specific task requires that a comprehensive maintenance
procedure be developed and kept on file in the CMMS for use by maintenance
personnel,the maintenance procedure number was referenced in the general task
description. Standard Operating Procedure(SOP) development is underway on a
separate staff-driven, consultant-supported project to ensure consistency between the
operations and maintenance descriptions.
Bill of Materials—A list of the needed bills of materials was developed for the
appropriate maintenance tasks. This list was linked with the asset/equipment in the
CMMS, and the warehouse inventory was reviewed to ensure that all materials are
available ahead of time for the various systems or their components.
Corrective/Emergency Parts—All critical assets and equipment were reviewed to
determine if corrective maintenance(CM) parts and/or emergency parts should be in the
warehouse inventory. This review was conducted to ensure that the appropriate
maintenance response to critical system failures could easily be accomplished, and to
meet the spec requirements of the Regional Board 6 WDR Order.
Hazardous Energy Control Procedure—Each asset/equipment item was evaluated to
determine If a LOTO procedure is required during maintenance for worker safety.
Potential procedures were identified and recommendation lists were developed and
forwarded to maintenance supervision for review and approval. When the procedures
were approved, they were developed with staff input under the direction of the assigned
maintenance supervisor or the appropriate subject matter expert.
10
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Confined Space Procedures—Maintenance procedures were developed for working in
confined spaces per OCSD Safety Division policy. Potential procedures were identified,
and recommendation lists were developed and forwarded to maintenance supervision
for review and approval. When the procedures were approved, they were developed
under the direction of the maintenance supervisor or the appropriate subject matter
expert.
Task Creation—The information developed during the RCM review of OCSD assets is
documented and forwarded to assigned CMMS support personnel for task creation
within the CMMS. All of the appropriate coding, descriptions and supporting
documentation is entered into the CMMS by support staff, and the resulting task lists are
forwarded to the project team for scheduling.
Maintenance Workflow Management
Successful maintenance support requires that we design a blend of mostly planned
maintenance, with an allowance for unplanned maintenance so that we minimize costs
while not sacrificing reliability. A management-approved maintenance strategy must be
applied to ensure that the appropriate mix of planned and unplanned maintenance tasks
are in place balancing risks, reliability and regulatory compliance as indicated.
When the appropriate tasks are in place and have been scheduled,the primary
objective of the implementation is the management plan of the needed staff and
contracted maintenance workflow to support the task schedule.
The workflow management process was reviewed by the project team. The existing
practices, policies and procedures were also reviewed to identify where changes or
improvements could be made to support the maintenance program objectives. During
this process,the maintenance program was modified to include a plan to review and
optimize the workflow management process. The plan included the following work
components:
• Planning process development
• Work activity scheduling
• Work assignment and tracking
• Work activity costing
• Ensure availability of maintenance and safety procedures
• Maintenance data history review and analysis
• Development of maintenance program strategies
The organization must also understand and analyze the following:
• Causes of equipment failures
• Effects of equipment failure
• Staff and/or contractor utilization
• Analysis of staff, materials, equipment and contractor work costs
Diagrams containing step-by-step workflow definitions for the appropriate workflow
management activities were developed and distributed for use by division staff. Policies
and procedures were developed to support the desired workflow management
11
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
processes. The policies and procedures should be reviewed periodically to integrate
lessons learned and improve the workflow management process after implementation.
Inventory Management and Procurement Practices
The Inventory Management and Procurement practices implemented during the process
plant reinvention (DART) process were expanded to include all the RABS Department
divisions. The practices include material requests, order entry,follow-up, receiving and
staging of parts and equipment, and inventory management practices. The initial
policies and procedures to support changes to the Inventory Management and
Procurement Practices were developed under the DART component of work,and should
be reviewed periodically to integrate improvements and streamline the procurement
process.
Financial Data Collection and Management
Accurate staff and/or contractor work order costing must to be accomplished to achieve
the desired work and financial analysis related to completed work activities. The current
cost-capturing process was developed based on inherent hardware and software
Limitations in the FIS as it exists today. The desire is to capture accurate work order
costs associated with Individual work activities, and aggregate those costs to all levels of
the asset hierarchy. The financial information that needs to be entered into work orders
should include but not be limited to the following:
• Labor costs
• Material costs
• Non-stock part costs
• Stock part costs
• Service provider or subcontractor costs
• Equipment costs
All work order tracking, assessment and closeout activities need to be completed by the
maintenance supervisor or the supervisor's designee to ensure that the appropriate work
review and closeout tasks are accomplished according to procedure.
Performance Management and Reporting
Division 420 staff are responsible for maintaining infrastructure assets and equipment in
support of the regional (medium and large diameter piping and pumping facilities) and
local (small diameter piping) collection systems at OCSD. Staff and contractor
performance must be monitored to ensure that they are effective and functioning
efficiently to minimize negative impacts due to other OCSD business unit's actions or
inactions due to poor planning. The extent to which staff and contractor performance is
monitored depends on our performance expectations and the level of service needs of
the OCSD end users. Contractor work performance must also be reviewed to ensure
that they are meeting all of the conditions of their contract scope of work.
12
,
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Supervisory and work team reports were put in place to provide information on
maintenance performance as part of the original DART reinvention project. The
performance categories and resulting performance measures are usually focused on the
quantity, quality, timeliness and cost-effectiveness of the maintenance needed to
complete the assigned work. Maintenance performance measures were established in
each of these areas, and reports were created that provide the information to meet the
requirements of the management team, supervisor(s), field personnel and contractors
engaged in completing the work activities. Similar reports were developed and
implemented as part of this effort.
Performance Categories
The expectations and needs of our customers, ratepayers or other end users ultimately
must become the measuring tool for any maintenance group. A well-designed
performance management process must be in place so that staff understands customer
expectations and LOS,and can identify the requirements to properly operate and
maintain the assets assigned to them and request the needed staffing, materials,
supplies and services.
The performance management process must track and report on all aspects of the
division's maintenance support function. Under ideal conditions, most of the
performance data will be obtained from both the work order system and the planning and
scheduling processes managed by staff or others in support roles. As a result, the
equipment database and work activity development and scheduling processes need to
be developed and implemented effectively. The performance categories (listed below)
must cover all aspects of the workflow management system, and the performance
measures should not be nanowly focused. The maintenance program performance
evaluation process should include the following categories:
• Craft and Contractor Labor Productivity
• Planning Effectiveness
• Customer Service Monitoring
• Planned Maintenance Effectiveness
• Maintenance Repair Organization (MRO) Materials Management
Each of these categories will have several performance measures associated with them.
The performance measures address specific components of each of the performance
categories and are described as follows.
Craft and contractor labor productivity is focused on utilization and performance.
Planning is focused on the execution of planned work and the requirements for
unplanned work due to the poor planning of other affected parties impacted by the
workflow management process(examples would be rescheduling work to support
special projects and construction activities that were not scheduled). Customer service
tracking is focused on work completed based on the original agreed to priority and time
constraints placed on the work orders between the end user and staff. The planned
maintenance category tracks backlog items, and the proper and timely execution of
corrective, preventive and predictive maintenance work. The MRO materials
management category tracks warehouse inventory accuracy, out-of-stock items, and
inventory reduction management.
13
September 26, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Performance Measures
The performance measures for each category were selected carefully and ultimately
reflect on the division's vision of maintenance effectiveness. The performance
measures contain the following features:
• The performance measures show progress and results of continuous
maintenance improvement (examples would be reduced down time,task
executed as planned in allowed hours, number of sewer blockages, spills etc).
• The performance measures provide evidence of success or failure in
maintenance or operations.
• The performance measures are broad-based and focus on types of work to be
completed, and the crafts, staff or contractors assigned to complete the work.
The performance is measured from the general category of tasks or groups of
staff to the speck task or person performing the work.
• The performance measure reporting is a natural byproduct of the maintenance
support tools (CMMS, FIS, condition-monitoring system, Supervisory Control
and Data Acquisition (SCADA), etc.)
We currenfly collect data and provide divisional reports dealing with:
• Craft and contractor labor productivity
• Planning and planned maintenance effectiveness
• Materials management
• Work order compliance and productivity metrics.
We provide this data through Crystal reports, Business Objects, and to the Board's
OMITS Committee and the General Manager. We also have some reports in
development for inspection workflows (i.e., manhole inspection and line segment
inspection).
We do not have a single weighted value (scorecard) report available for use as of yet.
This has been discussed internally but developmental work will remain on hold for now
due to staff resource constraints and a lack of industry-wide data to guide our approach.
Performance Reports
The performance report development process has been started and will be expanded
over time. The reports are and will continue to be constructed to provide the appropriate
information to the various target audiences. The reports for management are also very
broad based and focus on information by category(such as line cleaning footage versus
identification of the actual line segments cleaned for reporting purposes); while the
reports for maintenance supervision and the work groups are focused on the detailed
activities and status of work efforts(e.g., backlogs by work order so details of the task
can be examined as part of the review process). Reports are available on demand from
the CMMS and at specified intervals as appropriate to meet supervisory and
management needs.
14
r
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Special Projects
Engineering Document Chance Management
The addition of the sewer atlas, GIs and other information systems as tools to support
the day-to-day operation of the collection facilities assets resulted in a need for a change
management system to ensure that the as-built condition of the information contained in
these systems is maintained over time. The change management system provides a
process for documenting discrepancies between the information system databases and
the actual content in the field, updating of the record documents and databases, and
publishing of the changes for use by field personnel in the day-to-day operation and
maintenance of collection facilities assets. Several divisions participate in this important
process. Besides maintenance benefits, reduced CIP change orders are also possible.
Dig Alert Program Development and Implementation
An assessment and modification of the OCSD Dig Alert Program was conducted as part
of the project. The program responsibility was transferred from Engineering to the RA&S
Department in 2004. The revised program provides for an initial screening of dig alert
requests received by OCSD. Items that require OCSD response are now tracked as
work orders in the CMMS. All work completed by OCSD personnel to support the
program is documented and available as part of CMMS work order history as well as to
serve as documentation for regulatory compliance.
Land Record Document Program Assessment
An assessment of the existing Land Record Document(Easement) Management
Program was conducted as part of the project work. The assessment conducted by a
team comprised of Engineering, Information Technology, O&M and RA&S personnel
identified improvement opportunities for the program. An improvement implementation
plan was developed and delivered, and implementation of the recommended
improvements may be completed during the upcoming fiscal year(FY O6/07).
Long-term consultant and legal support may be required to solve current and future
right-of-way problems.
Project Analysis and Findings
Divisional Resource Analysis
This Resource Analysis was conducted to support compliance with the WDR Order as
well as management's and the team's desire to implement a more structured production
program with adequate staffing levels and minimum deferred maintenance. Staff
downsizing in FY 96/97 has caused increased backlogs and organizational stressors.
The resource analysis reflects the estimated staff and contractor labor commitment to
complete preventive and predictive maintenance tasks currently scheduled in the
15
September 25, 2006 ,
420 BUSINESS PRACTICES REINVENTION REPORT
CMMS. Estimates are also needed on the labor required to complete corrective
maintenance support, based on work order history. This is contingent on reviews of
current equipment requirements and the availability of contract support needed to
ensure adequate maintenance of OCSD collection system assets. The analysis
information is generated as reports from the CMMS. The reports access the task
information contained in the CMMS, such as task selection by type,then calculate the
tasks interval and task time information to determine the OCSD or contract labor
requirements to complete the work. The reports are generated using specific queries or
are set up as on-demand reports.
Maintenance Organizational Structure
The resource analysis will be used to revise staffs five-year staffing plan for the RABS
Department. The analysis will provide information on the level of effort required to
complete the activities scheduled in the CMMS on a recurring basis, and provided work
order history trends to estimate the historical level of effort required to support corrective
maintenance. This information will be used to reallocate field personnel and to set up
special work groups to implement recommendations for improvements in the Division
420 maintenance program.
Impacts due to the new State Water Resources Control Board General WDR Order for
Sanitary Sewer Systems, Order No.2006-0003 enacted on May 2, 2006 were not
analyzed as a part of this project,which concluded on June 30,2006.
Information on staffing levels and needs will be used to determine if contract labor
support is required, and if equipment and tools available to support work activities are
adequate. The information will also used to evaluate contract service support for
specialized work activities and "peak shaving"for PM backlog. This information is
accessed through reports generated from the CMMS.
Continuous Improvement of the Maintenance Program
The team recommended a periodic reassessment of the division's workload and a
review of staffing levels to ensure that adequate staffing and material resources are
available to meet minimum maintenance requirements consistent with current regulatory
mandates as well as best management practices. This periodic workload and resource
analysis effort will review performance reports and develop performance trends for
analysis by management. The analysis process will include decision making Mies that
will help identify opportunities for change that will result in continuous improvement of
the Maintenance Program overtime.
16
September 26, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Appendix
Acronyms And Abbreviations
BREA Business Risk Exposure Analysis
CA Periodic Calibration
CCTV Closed Circuit Television
CIP Capital Improvement Program
CM Corrective Maintenance
CMMS Computerized Maintenance Management System
CWA Clean Water Act
DART District Assessment and Reinvention Team
FIS Financial Information System
GIS Geographical Information System
GPM Gallons per Minute
I/FJC Instrumentation, Electrical and Control
LOS Level of Service
LOTO Lock Out Tag Out
MRO Maintenance Repair Organization
MTA Maintenance Task Analysis
O&M Operations and Maintenance
OCSD Orange County Sanitation District
OMITS Operations, Maintenance,Technical Services
(Board Committee)
PD Predictive Maintenance
PM Preventive Maintenance
RA&S Regional Assets and Services Department
including the Collection Facilities O&M Division
(420)
RCM Reliability Centered Maintenance
RD Redesign
RTF Run to Failure
SCADA Supervisory Control And Data Acquisition System
SOP Standard Operating Procedure
SSMP Sewer System Management Plan
SSO Sanitary Sewer Overflow
VFD Variable Frequency Drive
WEIR Waste Discharge Requirements Order
17
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
OCSO Trunk Sewer
A
It
t 7i
Orange County
4 Sanitation District
` N Trunk Sewers
oas.as
mouy..n�
18
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
Collection Facilities O & M - Division 420 Organization Chart
COLLECTION FACILITIES OPERATIONS&MAINTENANCE ORANGE COUNTY
DNISION 420(Located at Plant 2 except as noted) SANITATION DISTRICT
TASKS I STAFFING
9IEDS AeEIIe Wo A.eYPEEV 910
ke pay0ay Ri
]ypQ TECHNICALN
O41DStlNaluk UPoLovL
Tl FrtlryM NipM
meuM
YnmlumYIDm
Rry Pnm Md pbrCM14
NNYa CpVME 1
aCRIW M9FIAPf RVWC
iLPew
DINAnoN
MBNANCEPRWI@DBV EGMa G FRO.GIV.D. AnsooeDuy wAeAnDN
EN RE DUILMVELM4BitlP[NME SERVICES
R aIMM RECNaMC! YMVRNM'CE NPYLM
REOG!G
FLEET 4E.=NYdV a]!
FACILT(SERNC FS BV dV I]i �re°NbN
EWER MEPANIS.CCN BCIP BY
MRACLORSIXRU GW.AM.ANDIaG D+m SNub �NRN
n BUPPOM BYDIV.SK.NG.R60 p"L VwmTFNW EC xgAER PI
M WgnnWpwNlwgxG cNAa-S�
19
September 25, 2006
420 BUSINESS PRACTICES REINVENTION REPORT
OCSD Organization Chart
orange County sanitation District
Oum%mw�
psn
li,ilk min
Gtra l'B11 a-.gnr
nnlBlq NOI% gl% d&rwv nrn(n01
9Yeryd
"nmmm .YwuaW ��r w m arecnv
elWvn• QE LB jE PneBj E In n's
NI
I42%
PurvFWJy♦ Bu I.4Mmow P maM Opan's,mrvnmmYr IBbI SswvH]% M�e301 IB>QI
EL4rmy MaC�'
A1% IqunnR Eryrr�nq•
BDMue Cwwmn Opv
BNeml % 11001 1 1 �
rel% a�u.ol
uwrerve
Paq
tavNx�v
BVL91N• R 15p1
lqunml
MBI EMiMdld
roe
d�,ae%
PMc:pe
H'.%dept\rasr4 t 6\McNelly\Business Practices Reinvention ReporhRAS Reinvention Repolt FINAL_9-26-0 doe
20
I
OMTS COMMITTEE Meet gDate TOBtl.orDir.
10/04/06 10/26/O6
AGENDA REPORT Item Number Item Number
OMT506-09 10(c)
Orange County Sanitation District
FROM: James D. Herberg, Director of Operations and Maintenance
Originator: Michael Larkin, Engineering Supervisor
SUBJECT: OCEAN OUTFALL BOOSTER STATION REHABILITATION
ASSESSMENT STUDY, J-99
GENERAL MANAGER'S RECOMMENDATION
Approve a Consulting Services Agreement with Black & Veatch for the Ocean Outfall
Booster Station (GOBS) Rehabilitation Assessment Study, Job No. J-99, for an amount
not to exceed $175,002.
SUMMARY
• The Ocean Outfall Booster Station (GOBS) Pump Station at Plant No. 2 was
constructed in the late 1980s. Major components of the station are nearing the
end of their useful life. Additionally, electrical and instrumentation equipment are
becoming obsolete. Parts and technical support for existing equipment are
increasingly difficult to obtain. This study will expand previous "big picture" work
performed by RW Beck that projected future rehabilitation to keep the District's
major facilities operational.
• This assessment study will identify the current condition of the (OOBS) and any
necessary capital upgrades to the station to maintain continued reliable operation
of the facility. This study will also investigate and identify corrosion and the
probability of failures and risks associated with the larger pumping station
repairs.
ar The Request for Proposals was publicly advertised and was also sent directly to
seven consulting engineering companies. The only proposal received was from
Black & Veatch (B&V) in the amount of$185,158. After negotiations, the amount
was reduced to $175,002.
PRIOR COMMITTEE/BOARD ACTIONS
None
CDocuments and SeBinps4woxlocal Setlingan'emporary Internet Files\OLK70\Xem 10(c)J-99 GOBS Assessment0oc
Form No.M-1022 Aae Reparl-OWS
Dept]20 R-,. falfi.
Page 1
I
PROJECT/CONTRACT COST SUMMARY
Please see the enclosed Budget Information Table.
BUDGETIMPACT
® This item has been budgeted. (Line item: Budget Book, 2006-07, Section 8, Page 68)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
After negotiations, the $185,158 proposed fee was reduced to $175,002 through
combining travel and meeting expenses with a second project, the assessment of
Digesters A & B that was recently awarded to B&V. Both projects are similar and the
consultant proposed the use of the same staff and sub consultants.
B&V proposed the use of eleven key staff of which ten have worked extensively on
other OCSD Projects. The use of this staff will permit the consultant to work quickly and
efficiently because of their prior knowledge of OCSD Standards and operational needs.
Within the B&V Proposal, two previous projects were identified that showed direct
synergy with this project. These are the Effluent Pump Station Annex (EPSA) Project,
J-77; and, the Electrical Master Plan, J-102. The EPSA Project constructed backup
pump station to OOBS replacing the aging Foster Pump Station. From an electrical and
instrumentation perspective, the facilities associated with the refurbished OOBS Facility
will need to be compatible with the EPSA Facility.
With the planned completion of the EPSA, within the next two years, OCSD is
evaluating needed work to maintain the existing facilities in a good working order. The
proposed schedule is to evaluate the existing facilities, undertake a Professional
Services Agreement for the preparation of a Contract Document to rehabilitate GOBS
within the next three to four years.
ALTERNATIVES
• Not proceeding with the study. Delay of this project would extend the current
operation of the existing facility as many of the components near the end of their
useful life. This delay would increase risk to OCSD and would increase the
potential of emergency discharge to the Santa Ana River at Plant 2.
CEQA FINDINGS
Not Applicable
C1Documads and Selingsuxox oal SSIGngffomFa Irft a Fl•s10Lx78%inn 10(c)J-%OOaSMunomentooc
Form No.OW102.2 next nepm-arms
Dn..uo ae uee. iw,erxoos
Page 2
l
ATTACHMENTS
• Budget Information Table
0 Mocumenis and Scfings4emxLL col SMlinga\Tempotary Imamel Fllos\OLK7910em 10(c)J-Rg OOBS nssessmenldoc
Fond No.I 102-I FOenm Report-o S
Oe11.320 R. , 10110am
Page 3
BUDGET INFORMATION TABLE
OOBS Rehabilitation Assessment Study
Job No. J-99
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED AUTHORIZATION TOTAL EXPENDITURE TO EXPENDED TO
BUDGET BUDGET INCREASE BUDGET TO DATE REQUEST AUTHORIZATION DATE DATE(%)
Phase 1 -Project Dmlo ment $ 5.000 $ 5,000 $ 5.000 $ 5.000 $ 3,160 63%
Phase 2-Preliminary Design $ 185,000 $ 185,000 $ 185000 $ 185,000 $ 0%
Phase 3-Design $ $ $ $ - $ 0%
Phase 4-Construction $ $ $ $ - $ 0%
Phase S-Commissionin It $ $ $ - $ 0%
Phase 6-Closeout $ 10.000 $ 10,000 $ 10,000 $ 10,000 $ 0%
Phase 7-Contingency $ 8 $
PROJECTTOTAL $ - $ 200,000 $ - $ 200,000 1 1 $ 5.000 $ 195,000 1 $ 200,000 1 $ 3.160 2%
Reimbursable Costs
PROJECT NET 1 $ - $ 200,000 1 It - $ 200,000 11 $ $ 195.000 1 $ 200.000 1 $ 3,160 1 2%
PEA/Contract
iPrellmInart,Design PEA $ 175.002 $ 175,002 $ 175.002 $ 175.002 1 $ 0%
Construction Contract $ g $ p%
CADocuments and Settingsl.<eroA local Settings\Temporary Internet FileMOLK78\Item 10(c)J-99 GOBS Assessment An 1
OMTS COMMITTEE reemgW Toed.wur.
10/04/06 1o/25/06
AGENDA REPORT Item Number Rem Number
orrrsa-so lad)
Orange County Sanitation District
FROM: James D. Herberg, Director of Operations and Maintenance
Originator: Mike Larkin, Engineering Supervisor
SUBJECT: FERRIC CHLORIDE CONTRACT SPECIFICATION C-2005-247
GENERAL MANAGER'S RECOMMENDATION
Approve Change Order No. 1 to Purchase Order No. 102354 OB for purchase of ferric
chloride, Specification NO. C-2005-247, issued to Kemiron Pacific, for a unit price
increase of $76.20 per dry ton for ferric chloride increasing the total price to $434.00 per
dry ton plus tax for an estimated amount of$3,255,000 for the period December 1, 2006
through November 30, 2007.
SUMMARY
• Ferric chloride is an iron salt, which is currently used to increase the solids
removal efficiencies at both Plant 1 and Plant 2 in the primary treatment process
and to control digester hydrogen sulfide to meet Air Quality Management District
(AQMD) requirements.
• In fiscal year 2005-06, Kemiron Pacific was awarded a one-year contract to
provide ferric chloride after competitive bidding. The contract includes a
provision for four one-year contract extensions at the original bid price.
• Kemiron has offered to provide a one-year extension through
November 30, 2007, but at a price of$434.00 per dry ton for ferric chloride a
proposed increase of$76.20 per dry ton. Board approval is required because
the proposed extension is at an increased price.
• The raw material cost of steel pickle liquor, ferrous chloride, and hydrochloric
acid to manufacture ferric chloride, the cost of power, and transportation costs
have resulted in the higher unit costs to customers.
• Kemiron Pacific is the only vendor capable of providing the required volume of
ferric chloride for District operations.
• Staff recommends that the contract for ferric chloride be extended for an
additional one-year term.
C.�umiims and Sami,slxarov iSewnokTem,*mi,"~FIeSOLK78111em tgtl)Femo CNoneeeeo
F,xm No.DWI 2 gye„ee gepvl-Wrs
Page 1
PRIOR COMMITTEEIBOARD ACTIONS
None, the contract was competitively bid in fiscal year 2005-06 and awarded by the
Purchasing Manager according to Resolution No. OCSD 04-08, Delegation of
Authority.
PROJECT/CONTRACT COST SUMMARY
OCSD Ferric Chloride Contract Summary
December 1, 2005— November 30, 2006
Dry Tons Cost per Dry Ton* Total Cost
Ferric Chloride 7,500 $357.80 $2,683,500
December 1, 2006— November 30, 2007
Dry Tons Cost per Dry Ton* Total Cost
Ferric Chloride 7,500 $434.00 $3,255,000
*Cost per dry ton delivered without tax
BUDGETIMPACT
® This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
• In March 2006, the Sanitation District surveyed agencies throughout the United
States to determine if another company might be able to provide ferric chloride.
The Sanitation District was able to identify only one large supplier of ferric
chloride, PVS Technologies. However, it was determined that the three sites in
Illinois, New York, and Ohio were too far to achieve a reasonable rate structure.
• The Sanitation District has also completed an investigation of several
neighboring wastewater agencies that use ferric chloride. These agencies and
their ferric chloride vendor are provided below.
CV menu and S Nsl oX ocal Seldn,Wenn o q Imemet FileslOU(MRam 10(C)Ferric Chlodde.doc
Folm No.DW 102-2 ba,ka aeNl-�aRa
dead 220 awiM. =16&!006
Page 2
City of Los Angeles Kemiron
City of San Diego Kemiron
Inland Empire Utility Agency Kemiron
Los Angeles County Sanitation Kemiron
Encina Wastewater Authority CWf
Staff has been discussing chemical costs with these other agencies. Although
the purity of the ferric chloride varies, their cost is consistent with unit rates
proposed by Kemiron.
ALTERNATIVES
• Contract with Kemiron Pacific for a lower grade ferric chloride that contains a
higher concentration of ferric sulfate. This option would save $65 per dry ton but
the affect on the treatment plants is not well known and may result in poor
treatment, increased sulfides, and increased treatment costs.
• Do not extend the contract with Kemiron Pacific, and instead competitively bid
the contract. When the contract was competitively bid in 2005 there were no
other bidders.
CEQA FINDINGS
Not applicable
ATTACHMENTS
None
C'.1Omuments an SebngsVemALmal&Mngsl`remporary Internet FdIe LK181Kem to(E)FemCChlodde.Cw
Foml No.W lW2 gHenUe gepxl-CMfS
Mq.330 ftealxU. 1011&2006
Page 3
OMTS COMMITTEE Meeting Date Toad.a 0lr.
10/04/O6 10/25/O6
AGENDA REPORT Item Number Item Number
OMT506-51 10(e)
Orange County Sanitation District
FROM: James D. Herberg, Director of Operations and Maintenance
Originator: Mark Tomko, Senior Engineer
SUBJECT: EXTERNAL INSPECTION OF THE 120-INCH AND 78-INCH OCEAN
PIPELINES
GENERAL MANAGER'S RECOMMENDATION
Receive and file the 2006, 120-inch and 78-inch Outfalls Inspection Report and
120-inch/78-inch Port Book reports prepared by Undersea Graphics, dated June 20,
2006.
SUMMARY
• During winter and spring of 2006, the Sanitation District conducted external
inspections of our ocean outfalls.
• The inspection of both ocean outfalls suggests that the existing facilities are in
good working order. Minimal plugging of diffuser ports was observed and there
are no significant changes to the outfall facilities since the last inspection (winter
and spring of 2003).
PRIOR COMMITTEEIBOARD ACTIONS
NA
PROJECT/CONTRACT COST SUMMARY
NA
Q1 umallls ands ngstxemxLLoul Seaings\Temporary Intwn FllestOLKYatgemto(e)Undemea Gmphlu.aoc
F0m1 No.OW1032 IQeMeeepon-OMra
aW.01'0 Ra Iw latelN:6
Page 1
BUDGETIMPACT t
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
The National Pollution Discharge Elimination System (NPDES) Permit requires
appropriate maintenance of the Ocean Outfall System consisting of the five-mile long
120-inch pipeline (primary ouffall) and the 1.4 mile long 78-inch pipeline (emergency
use). An integral part of the preventive maintenance program is to regularly inspect and
assess the condition of both pipelines.
The goals of the inspection conducted in December 2005, and April and May 2006 were
to assess the external condition of both pipelines, to identify potential problems, and to
provide information for future planning and preventive/corrective maintenance efforts.
Undersea Graphics, using manned submarines as well as SCUBA divers for ten diving
days, performed an external inspection of the 120-inch (primary ouffall) and 78-inch
(emergency use) ocean pipelines during these inspections both pipelines were
videotaped.
120-Inch Ouffall Inspection Results:
• The 120-inch ouffall, constructed in 1971, consists of a four-mile pipe with a
one-mile diffuser section containing 500 discharge ports.
• The video showed the exterior of the 120-inch outfall to be in good condition
with little change since the 2002 inspection.
• The contractor reported two changes from the prior inspection: a heavy layer
of sediment on all sections of the outfall; and a high density of sculpin near
the egress structure (structure to enter or exit pipeline). It is believed that
this sediment may have resulted from excessive red tide conditions in 2005.
Sculpin fish gather during mating season (spring through summer) and a
large portion of the 2006 inspection occurred during the months of April and
June. The outfall inspection in 2004 was completed in January and
February, which may be the reason high sculpin densities were not observed
at that time.
• The contractor found twelve partially plugged and three completely plugged
ports; six ports were partially plugged and four completely plugged in the
prior inspection in 2004. Staff recommends continued inspection and
F�DocunaXs eM SeW�psUero>LLacal SMnpslTempnary IMema1 FaeaWLl()Mem tIXa�UnEersea Graphics tloc
Fam No.qW tY33 /penaa xepon-OArtS
pFe.yp Pwife] t011bS0]6
Page 2
}
tracking of all ports; and, based upon their condition in future inspections,
schedule corrective maintenance to open the clogged/plugged ports.
• Eleven of the obstructed ports were in the last 40 ports of the diffuser
section.
• The outfall flap gate was seated against the floor of the base structure and
showed signs of normal effluent seepage under the flap gate door.
• The ballast rock supporting the pipeline, improved during Project J-39 in
2002, is still in place and supporting the entire pipeline.
• The concrete and manholes show no leakage or new damage. Several
chipped pipe bell joints were viewed but they did not appear to be recent.
78-inch.Outfall Inspection Results:
• The 78-inch outfall that was completed in 1954 is in good condition. This
pipeline showed no new concrete damage.
• The 78-inch outfall was operated in April 2006 and the inspection of the
78-inch pipeline was completed in June 2006. There were no changes
observed from operating the pipeline.
• The end structure and flap gate show no concrete spalling and the hinge
assemblies on the end gate appear solid and functional.
• Twenty-one of 123 ports on the 78-inch outfall are buried and the remaining
102 ports are 75% to 95% open.
• Sandbagging at the wye structure showed no change or movement.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
N/A
=ocumeMa-no S WngsVmxa ocal9 ngslTampmery IMamM FIIes1GLK784gem 10(e)Gndmsw Gmphks.0
Foml No.M-1012 Mmaa Fepan-O S
pspl.y0 Revirtl: 1011saM
Page 3
OMTS COMMITTEE Meel9Date Tuad.0 -
to/oa/ae to/25/a6
AGENDA REPORT Item Number Item Number
oMTS06-52 Ion)
Orange County Sanitation District
FROM: Nick Arhontes, Director of Regional Assets and Services
Originator: Patrick McNally, Principal Staff Analyst
SUBJECT: Compliance with new Statewide WDR Order for Sanitary Sewers
GENERAL MANAGER'S RECOMMENDATION:
Approve the development and implementation of a Compliance Program with the sanitary
sewer system Waste Discharge Requirements (WDR) as required statewide by State
Water Resources Control Board Order No. 2006-0003-DWQ issued on May 2, 2006.
SUMMARY
The State Water Resources Control Board (State Water Board) adopted Resolution 2004-
80 in November 2004, requiring their staff to work with a diverse group of stakeholders
statewide (known as the SSO Guidance Committee) to develop a regulatory mechanism to
provide a consistent statewide approach for reducing Sanitary Sewer Overflows (SSOs).
During that time, State Water Board staff in collaboration with the SSO Guidance
Committee, developed draft statewide general waste discharge requirements (WDRs) and
also a uniform SSO reporting program.
In January 2006, the State Water Board issued a draft WDR for public review and
comment. They conducted a public hearing in Sacramento on February 8, 2006, to receive
oral and written comments on the draft WDR from public agencies, cities and non
governmental organizations (NGO). At their May 2, 2006 meeting, the Board chair and
members received and considered additional public comments on changes made to the
proposed general WDRs following the February 8, 2006, public hearing, and issued Order
No. 2006-0003.
All federal and state agencies, municipalities, counties, districts, and other public entities
that own or operate sanitary sewer systems greater than one mile in length that collect
and/or convey untreated or partially treated wastewater to a publicly owned treatment
facility in the state of California are required to comply with the terms of this Order. This
affects an estimated 1,350 to 1,500 cities and agencies. Such entities are defined as
"Enrollees." All Enrollees are required to apply for coverage under the new statewide Order
six months after the adoption of the Order or by November 2, 2006. The state has provided
forms and instructions for OCSD use as well as a fee schedule. The annual fee for OCSD
is $4,676 as an agency serving more than 50,000 people. Cities and agencies with less
than 50,000 served pay $872 per year. The General Manager will be the overall Legally
Responsible Official for OCSD for compliance and the Director of Regional Assets and
Services will serve as the designee for the electronic SSO reporting program and its
password.
Form No.DA&IM-2 ApmEa Re -OWS
oapl.]20 R.w. 1 W1&M6
Page 1
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
We feel that there is no need to add staff or increase our operating budget at this time.
Staff time from many divisions will be needed to review and modify our current RB8
deliverables per the state's schedule. We do not anticipate a need for consulting services
to complete this work. Each department is expected to provide a representative as a
liaison to assist in the OCSD effort to achieve compliance.
BUDGET IMPACT
® This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information Rem)
ADDITIONAL INFORMATION
The Order requires that each Enrollee shall develop and implement a written Sewer
System Management Plan (SSMP) and make it available to the State and/or Regional
Water Board upon request. A copy of this document must be publicly available at the
Enrollee's office and/or available on the Internet. We have a new obligation under this
WDR that our SSMP must be approved by the OCSD Board at a public meeting and that
we are required to communicate with the public on a regular basis on the development,
implementation and performance of our SSMP. The public must also be given the
opportunity to provide input as the compliance program is developed and implemented.
OCSD RA&S and Technical Services staff has conducted a comprehensive review of the
new statewide Order to determine what, R any, changes we must make to our existing
SSMP and program that we developed for Regional Board 8 from 2002 thru 2005. There
are some differences however that we will need to address while migrating from the Region
8 WDR Orders requirements to the new statewide requirements.
We will also continue to work in a collaborative manner with the local cities and sewering
agencies thru our local WDR Steering Committee and monthly general meetings to help
achieve compliance as a team. All of our member cities and agencies must also Enroll
under the new statewide WDR Order.
OCSD is currently a permittee under California Regional Water Quality Control Board
(RWQCB), Santa Ana Region, Order No. R8-2002-0014 entitled "General Waste Discharge
Requirements for Sewage Collection Agencies in Orange County within the Santa Ana
Region" issued on April 26, 2002. The purpose of that Order was to require agencies to
prepare a plan and schedule for measures to be implemented to prevent sanitary sewer
overflows (SSOs), as well as measures to effectively clean up and report SSOs. The major
FOOD NO 10 2 NpnOc gep"1-G.RS
dq.]A NenuO 1W,ft2000
Page 2
deliverable required under the Order was the Sewer System Management Plan (SSMP)
which we delivered in September 2005. Staff of the RWQCB has indicated that they will
1 probably recommend rescinding their Order to their Board members when the State Board
in November or December of 2006.
A phased-in approach is being used statewide. A portion of the statewide Order's SSMP
time schedule for various SSMP tasks and sections is shown below for your information.
OCSD's population served is in the over 100,000 category and we reside in SWRCB
Region 8. A detailed schedule covering all SWRCB Regions is available in the state's
WDR document.
Sewer System Management Plan Time Schedule for OCSD
Task and Associated Section of WDR Completion Date
Application for Permit Coverage Section C 6 months after WDRs Adoption or by Nov. 2 ,2006
Reporting Program 8 months after WDRs Adoption or on Jan. 3,2007
Section G
SSMP Development Plan and Schedule 9 months after WDRs Adoption or on Feb. 2, 2007
No specific Section
Goals and Organization Structure 12 months after WDRs Adoption or on May 2, 2007
Section D 13(i)6(ii)
Overflow Emergency Response Program 24 months after WDRs Adoption or on May 2, 2008
Section D 13(vi)
Legal Authority 24 months after WDRs Adoption or on May 2, 2008
Section D 13 iii
Operation and Maintenance Program 24 months after WDRs Adoption or on May 2, 2008
Section D 13 Iv
Grease Control Program 24 months after WDRs Adoption or on May 2, 2008
Section D 13 vii
Design and Performance
Section D 13 v 36 months after WDRs Adoption or on May 2, 2009
System Evaluation and Capacity Assurance Plan 36 months after WDRs Adoption or on May 2, 2009
Section D 13(viii)
Final SSMP, incorporating all of the SSMP requirements 36 months after WDRs Adoption or on May 2, 2009
Section D 13
For complete information on the State Water Resource Control Board's WDR program
please also see the following link http://www.sWrcb.ca.gov/sso/.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. Statewide General WDR for Sanitary Sewers Order 2006-0003-DWQ —20 pages and
Monitoring and Reporting Program for Statewide General WDR for Sanitary Sewers Order
2006-0003-DWQ—5 pages (one PDF).
NJA:pe
H:Wepnagenda\OMTS12006t1006Wr.e 2.State de WDR.dw
Fow No,WF10 2 Npenm tepon-par8
Mot no awlveE: 1b1aR00a
Page 3
r
STATE WATER RESOURCES CONTROL BOARD
ORDER NO. 2006-0003-DWQ
STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS
FOR
SANITARY SEWER SYSTEMS
The State Water Resources Control Board, hereinafter referred to as "State
Water Board", finds that:
1. All federal and state agencies, municipalities, counties, districts, and other public
entities that own or operate sanitary sewer systems greater than one mile in
length that collect and/or convey untreated or partially treated wastewater to a
publicly owned treatment facility in the State of California are required to comply
with the terms of this Order. Such entities are hereinafter referred to as
"Enrollees".
2. Sanitary sewer overflows(SSOs) are overflows from sanitary sewer systems of
domestic wastewater, as well as industrial and commercial wastewater,
depending on the pattern of land uses in the area served by the sanitary sewer
system. SSOs often contain high levels of suspended solids, pathogenic
organisms, toxic pollutants, nutrients, oxygen-demanding organic compounds, oil
and grease and other pollutants. SSOs may cause a public nuisance,
particularly when raw untreated wastewater is discharged to areas with high
public exposure, such as streets or surface waters used for drinking, fishing, or
body contact recreation. SSOs may pollute surface or ground waters, threaten
public health, adversely affect aquatic life, and impair the recreational use and
aesthetic enjoyment of surface waters.
3. Sanitary sewer systems experience periodic failures resulting in discharges that
may affect waters of the state. There are many factors (including factors related
to geology, design, construction methods and materials, age of the system,
population growth, and system operation and maintenance), which affect the
likelihood of an SSO. A proactive approach that requires Enrollees to ensure a
system-wide operation, maintenance, and management plan is in place will
reduce the number and frequency of SSOs within the state. This approach will in
turn decrease the risk to human health and the environment caused by SSOs.
4. Major causes of SSOs include: grease blockages, root blockages, sewer line
flood damage, manhole structure failures, vandalism, pump station mechanical
failures, power outages, excessive storm or ground water inflowfinfiltration,
debris blockages, sanitary sewer system age and construction material failures,
lack of proper operation and maintenance, insufficient capacity and contractor-
caused damages. Many SSOs are preventable with adequate and appropriate
facilities, source control measures and operation and maintenance of the sanitary
sewer system.
State Water Resources Control Board Order No. 2006-0003-DWQ Page 2 of 20 ,
Statewide General WDR For Wastewater Collection Agencies 512106 u
SEWER SYSTEM MANAGEMENT PLANS
5. To facilitate proper funding and management of sanitary sewer systems, each
Enrollee must develop and implement a system-specific Sewer System
Management Plan (SSMP). To be effective, SSMPs must include provisions to
provide proper and efficient management, operation, and maintenance of
sanitary sewer systems, while taking into consideration risk management and
cost benefit analysis. Additionally, an SSMP must contain a spill response plan
that establishes standard procedures for immediate response to an SSO in a
manner designed to minimize water quality impacts and potential nuisance
conditions.
6. Many local public agencies in California have already developed SSMPs and
implemented measures to reduce SSOs. These entities can build upon their
existing efforts to establish a comprehensive SSMP consistent with this Order.
Others, however, still require technical assistance and, in some cases, funding to
improve sanitary sewer system operation and maintenance in order to reduce
SSOs.
7. SSMP certification by technically qualified and experienced persons can provide
a useful and cost-effective means for ensuring that SSMPs are developed and
implemented appropriately.
6. It is the State Water Board's intent to gather additional information on the causes
and sources of SSOs to augment existing information and to determine the full
extent of SSOs and consequent public health and/or environmental impacts
occurring in the State.
9. Both uniform SSO reporting and a centralized statewide electronic database are
needed to collect information to allow the State Water Board and Regional Water
Quality Control Boards (Regional Water Boards) to effectively analyze the extent
of SSOs statewide and their potential impacts on beneficial uses and public
health. The monitoring and reporting program required by this Order and the
attached Monitoring and Reporting Program No. 2006-0003-DWQ, are necessary
to assure compliance with these waste discharge requirements (WDRs).
10.Information regarding SSOs must be provided to Regional Water Boards and
other regulatory agencies in a timely manner and be made available to the public
in a complete, concise, and timely fashion.
11.Some Regional Water Boards have issued WDRs or WDRs that serve as
National Pollution Discharge Elimination System (NPDES) permits to sanitary
sewer system owners/operators within their jurisdictions. This Order establishes
minimum requirements to prevent SSOs. Although it is the State Water Board's
intent that this Order be the primary regulatory mechanism for sanitary sewer
systems statewide, Regional Water Boards may issue more stringent or more
State Water Resources Control Board Order No. 2006-0003-DWQ Page 3 of 20
v Statewide General WDR For Wastewater Collection Agencies 5/2/06
prescriptive WDRs for sanitary sewer systems. Upon issuance or reissuance of
a Regional Water Board's WDRs for a system subject to this Order, the Regional
Water Board shall coordinate its requirements with stated requirements within
this Order, to identify requirements that are more stringent, to remove
requirements that are less stringent than this Order, and to provide consistency
in reporting.
REGULATORY CONSIDERATIONS
12. California Water Code section 13263 provides that the State Water Board may
prescribe general WDRs for a category of discharges if the State Water Board
finds or determines that:
• The discharges are produced by the same or similar operations;
• The discharges involve the same or similar types of waste;
• The discharges require the same or similar treatment standards; and
• The discharges are more appropriately regulated under general discharge
requirements than individual discharge requirements.
This Order establishes requirements for a class of operations, facilities, and
discharges that are similar throughout the state.
13.The issuance of general WDRs to the Enrollees will:
a) Reduce the administrative burden of issuing individual WDRs to each
Enrollee;
b) Provide for a unified statewide approach for the reporting and database
tracking of SSOs;
c) Establish consistent and uniform requirements for SSMP development
and implementation;
d) Provide statewide consistency in reporting; and
e) Facilitate consistent enforcement for violations.
14.The beneficial uses of surface waters that can be impaired by SSOs include, but
are not limited to, aquatic life, drinking water supply, body contact and non-
contact recreation, and aesthetics. The beneficial uses of ground water that can
be impaired include, but are not limited to, drinking water and agricultural supply.
Surface and ground waters throughout the state support these uses to varying
degrees.
15.The implementation of requirements set forth in this Order will ensure the
reasonable protection of past, present, and probable future beneficial uses of
water and the prevention of nuisance. The requirements implement the water
quality control plans (Basin Plans) for each region and take into account the
environmental characteristics of hydrographic units within the state. Additionally,
the State Water Board has considered water quality conditions that could
reasonably be achieved through the coordinated control of all factors that affect
State Water Resources Control Board Order No. 2006-0003-D WQ Page 4 of 20
Statewide General WDR For Wastewater Collection Agencies 512106 e
water quality in the area, costs associated with compliance with these
requirements, the need for developing housing within California, and the need to
develop and use recycled water.
16.The Federal Clean Water Act largely prohibits any discharge of pollutants from a
point source to waters of the United States except as authorized under an
NPDES permit. In general, any point source discharge of sewage effluent to
waters of the United States must comply with technology-based, secondary
treatment standards, at a minimum, and any more stringent requirements
necessary to meet applicable water quality standards and other requirements.
Hence, the unpermitted discharge of wastewater from a sanitary sewer system to
waters of the United States is illegal under the Clean Water Act. In addition,
many Basin Plans adopted by the Regional Water Boards contain discharge
prohibitions that apply to the discharge of untreated or partially treated
wastewater. Finally, the California Water Code generally prohibits the discharge
of waste to land prior to the filing of any required report of waste discharge and
the subsequent issuance of either WDRs or a waiver of WDRs.
17.California Water Code section 13263 requires a water board to, after any
necessary hearing, prescribe requirements as to the nature of any proposed
discharge, existing discharge, or material change in an existing discharge. The
requirements shall, among other things, take into consideration the need to
prevent nuisance.
18.California Water Code section 13050, subdivision (m), defines nuisance as
anything which meets all of the following requirements:
a. Is injurious to health, or is indecent or offensive to the senses, or an
obstruction to the free use of property, so as to interfere with the
comfortable enjoyment of life or property.
b. Affects at the same time an entire community or neighborhood, or any
considerable number of persons, although the extent of the annoyance or
damage inflicted upon individuals may be unequal.
c. Occurs during, or as a result of, the treatment or disposal of wastes.
19.This Order is consistent with State Water Board Resolution No. 68-16 (Statement
of Policy with Respect to Maintaining High Quality of Waters in California) in that
the Order imposes conditions to prevent impacts to water quality, does not allow
the degradation of water quality, will not unreasonably affect beneficial uses of
water, and will not result in water quality less than prescribed in State Water
Board or Regional Water Board plans and policies.
20.The action to adopt this General Order is exempt from the California
Environmental Quality Act (Public Resources Code §21000 at seq.) because it is
an action taken by a regulatory agency to assure the protection of the
environment and the regulatory process involves procedures for protection of the
environment. (Cal. Code Regs., tit. 14, §15308). In addition, the action to adopt
State Water Resources Control Board Order No. 2006-0003-DWO Page 5 of 20
a Statewide General WDR For Wastewater Collection Agencies 51W6
this Order is exempt from CEQA pursuant to Cal.Code Regs., title 14, §15301 to
the extent that it applies to existing sanitary sewer collection systems that
constitute "existing facilities"as that term is used in Section 15301, and §15302,
to the extent that it results in the repair or replacement of existing systems
involving negligible or no expansion of capacity.
21.The Fact Sheet, which is incorporated by reference in the Order, contains
supplemental information that was also considered in establishing these
requirements.
22.The State Water Board has notified all affected public agencies and all known
interested persons of the intent to prescribe general WDRs that require Enrollees
to develop SSMPs and to report all SSOs.
23.The State Water Board conducted a public hearing on February 8, 2006, to
receive oral and written comments on the draft order. The State Water Board
received and considered, at its May 2, 2006, meeting, additional public
comments on substantial changes made to the proposed general WDRs
following the February 8, 2006, public hearing. The State Water Board has
considered all comments pertaining to the proposed general WDRs.
IT IS HEREBY ORDERED, that pursuant to California Water Code section 13263, the
Enrollees, their agents, successors, and assigns, in order to meet the provisions
contained in Division 7 of the California Water Code and regulations adopted
hereunder, shall comply with the following:
A. DEFINITIONS
1. Sanitary sewer overflow(SSO)-Any overflow, spill, release, discharge or
diversion of untreated or partially treated wastewater from a sanitary sewer
system. SSOs include:
(i) Overflows or releases of untreated or partially treated wastewater that
reach waters of the United States;
(ii) Overflows or releases of untreated or partially treated wastewater that do
not reach waters of the United States; and
(iii) Wastewater backups into buildings and on private property that are
caused by blockages or flow conditions within the publicly owned portion
of a sanitary sewer system.
2. Sanitary sewer system—Any system of pipes, pump stations, sewer lines, or
other conveyances, upstream of a wastewater treatment plant headworks used
to collect and convey wastewater to the publicly owned treatment facility.
Temporary storage and conveyance facilities (such as vaults, temporary piping,
construction trenches, wet wells, impoundments, tanks, etc.) are considered to
be part of the sanitary sewer system, and discharges into these temporary
storage facilities are not considered to be SSOs.
State Water Resources Control Board Order No. 2006-0003-DWQ Page 6 of 20
Statewide General WDR For Wastewater Collection Agencies &W6 r
For purposes of this Order, sanitary sewer systems include only those systems
owned by public agencies that are comprised of more than one mile of pipes or
sewer lines.
3. Enrollee-A federal or state agency, municipality, county, district, and other
public entity that owns or operates a sanitary sewer system, as defined in the
general WDRs, and that has submitted a complete and approved application for
coverage under this Order.
4. SSO Reporting System — Online spill reporting system that is hosted,
controlled, and maintained by the State Water Board. The web address for this
site is http:/Iciwgs.waterboards.ca.gov. This online database is maintained on a
secure site and is controlled by unique usernames and passwords.
5. Untreated or partially treated wastewater—Any volume of waste discharged
from the sanitary sewer system upstream of a wastewater treatment plant
headworks.
6. Satellite collection system —The portion, if any, of a sanitary sewer system
owned or operated by a different public agency than the agency that owns and
operates the wastewater treatment facility to which the sanitary sewer system is
tributary.
7. Nuisance- California Water Code section 13050, subdivision (m), defines
nuisance as anything which meets all of the following requirements:
a. Is injurious to health, or is indecent or offensive to the senses, or an
obstruction to the free use of property, so as to interfere with the
comfortable enjoyment of life or property.
b. Affects at the same time an entire community or neighborhood, or any
considerable number of persons, although the extent of the annoyance or
damage inflicted upon individuals may be unequal.
c. Occurs during, or as a result of, the treatment or disposal of wastes.
B. APPLICATION REQUIREMENTS
1.Deadlines for Application—All public agencies that currently own or operate
sanitary sewer systems within the State of California must apply for coverage
under the general WDRs within six (6) months of the date of adoption of the
general WDRs. Additionally, public agencies that acquire or assume
responsibility for operating sanitary sewer systems after the date of adoption of
this Order must apply for coverage under the general WDRs at least three (3)
months prior to operation of those facilities.
2. Applications under the general WDRs— In order to apply for coverage pursuant
to the general WDRs, a legally authorized representative for each agency must
submit a complete application package. Within sixty (60) days of adoption of the
general WDRs, State Water Board staff will send specific instructions on how to
State Water Resources Control Board Order No. 2006-0003-DWQ Page 7 of 20
r Statewide General WDR For Wastewater Collection Agencies 512106
apply for coverage under the general WDRs to all known public agencies that
own sanitary sewer systems. Agencies that do not receive notice may obtain
applications and instructions online on the Water Board's website.
3. Coverage under the general WORs— Permit coverage will be in effect once a
complete application package has been submitted and approved by the State
Water Board's Division of Water Quality.
C. PROHIBITIONS
1. Any SSO that results in a discharge of untreated or partially treated wastewater
to waters of the United States is prohibited.
2. Any SSO that results in a discharge of untreated or partially treated wastewater
that creates a nuisance as defined in California Water Code Section 13050(m) is
prohibited.
D. PROVISIONS
1. The Enrollee must comply with all conditions of this Order. Any noncompliance
with this Order constitutes a violation of the California Water Code and is
grounds for enforcement action.
2. It is the intent of the State Water Board that sanitary sewer systems be regulated
in a manner consistent with the general WDRs. Nothing in the general WDRs
shall be:
(i) Interpreted or applied in a manner inconsistent with the Federal Clean
Water Act, or supersede a more specific or more stringent state or
federal requirement in an existing permit, regulation, or
administrativeludicial order or Consent Decree;
(ii) Interpreted or applied to authorize an SSO that is illegal under either the
Clean Water Act, an applicable Basin Plan prohibition or water quality
standard, or the California Water Code;
(iii) Interpreted or applied to prohibit a Regional Water Board from issuing an
individual NPDES permit or WDR, superseding this general WDR, for a
sanitary sewer system, authorized under the Clean Water Act or
California Water Code; or
(iv) Interpreted or applied to supersede any more specific or more stringent
WDRs or enforcement order issued by a Regional Water Board.
3. The Enrollee shall take all feasible steps to eliminate SSOs. In the event that an
SSO does occur, the Enrollee shall take all feasible steps to contain and mitigate
the impacts of an SSO.
4. In the event of an SSO, the Enrollee shall take all feasible steps to prevent
untreated or partially treated wastewater from discharging from storm drains into
State Water Resources Control Board Order No. 2006-0003-DWQ Page 8 of 20
Statewide General WDR For Wastewater Collection Agencies 5/21106 v
flood control channels or waters of the United States by blocking the storm
drainage system and by removing the wastewater from the storm drains.
5. All SSOs must be reported in accordance with Section G of the general WDRs.
6. In any enforcement action, the State and/or Regional Water Boards will consider
the appropriate factors under the duly adopted State Water Board Enforcement
Policy. And, consistent with the Enforcement Policy, the State and/or Regional
Water Boards must consider the Enrollee's efforts to contain, control, and
mitigate SSOs when considering the California Water Code Section 13327
factors. In assessing these factors, the State and/or Regional Water Boards will
also consider whether:
(i) The Enrollee has complied with the requirements of this Order, including
requirements for reporting and developing and implementing a SSMP;
(ii) The Enrollee can identify the cause or likely cause of the discharge event;
(iii)There were no feasible alternatives to the discharge, such as temporary
storage or retention of untreated wastewater, reduction of inflow and
infiltration, use of adequate backup equipment, collecting and hauling of
untreated wastewater to a treatment facility, or an increase in the
capacity of the system as necessary to contain the design storm event
identified in the SSMP. It is inappropriate to consider the lack of feasible
alternatives, if the Enrollee does not implement a periodic or continuing
process to identify and correct problems.
(iv)The discharge was exceptional, unintentional, temporary, and caused by
factors beyond the reasonable control of the Enrollee;
(v) The discharge could have been prevented by the exercise of reasonable
control described in a certified SSMP for:
• Proper management, operation and maintenance;
• Adequate treatment facilities, sanitary sewer system facilities,
and/or components with an appropriate design capacity, to
reasonably prevent SSOs (e.g., adequately enlarging treatment or
collection facilities to accommodate growth, infiltration and inflow
(1/1), etc.);
• Preventive maintenance (including cleaning and fats, oils, and
grease (FOG) control);
• Installation of adequate backup equipment; and
• Inflow and infiltration prevention and control to the extent
practicable.
(vi)The sanitary sewer system design capacity is appropriate to reasonably
prevent SSOs.
State Water Resources Control Board Order No. 2006-0003-DWQ Page 9 of 20
v Statewide General WDR For Wastewater Collection Agencies 512106
(vii) The Enrollee took all reasonable steps to stop and mitigate the impact of
the discharge as soon as possible.
7. When a sanitary sewer overflow occurs, the Enrollee shall take all feasible steps
and necessary remedial actions to 1) control or limit the volume of untreated or
partially treated wastewater discharged, 2)terminate the discharge, and 3)
recover as much of the wastewater discharged as possible for proper disposal,
including any wash down water.
The Enrollee shall implement all remedial actions to the extent they may be
applicable to the discharge and not inconsistent with an emergency response
plan, including the following:
(i) Interception and rerouting of untreated or partially treated wastewater
flows around the wastewater line failure;
(ii) Vacuum truck recovery of sanitary sewer overflows and wash down
water;
(iii) Cleanup of debris at the overflow site;
(iv) System modifications to prevent another SSO at the same location;
(v) Adequate sampling to determine the nature and impact of the release;
and
(vi) Adequate public notification to protect the public from exposure to the
SSO.
8. The Enrollee shall properly, manage, operate, and maintain all parts of the
sanitary sewer system owned or operated by the Enrollee, and shall ensure that
the system operators (including employees, contractors, or other agents) are
adequately trained and possess adequate knowledge, skills, and abilities.
9. The Enrollee shall allocate adequate resources for the operation, maintenance,
and repair of its sanitary sewer system, by establishing a proper rate structure,
accounting mechanisms, and auditing procedures to ensure an adequate
measure of revenues and expenditures. These procedures must be in
compliance with applicable laws and regulations and comply with generally
acceptable accounting practices.
10.The Enrollee shall provide adequate capacity to convey base flows and peak
flows, including flows related to wet weather events. Capacity shall meet or
exceed the design criteria as defined in the Enrollee's System Evaluation and
Capacity Assurance Plan for all parts of the sanitary sewer system owned or
operated by the Enrollee.
11.The Enrollee shall develop and implement a written Sewer System Management
Plan (SSMP) and make it available to the State and/or Regional Water Board
upon request. A copy of this document must be publicly available at the
Enrollee's office and/or available on the Internet. This SSMP must be approved
by the Enrollee's governing board at a public meeting.
State Water Resources Control Board Order No. 2006-0003-DWQ Page 10 of 20
Statewide General WDR For Wastewater Collection Agencies &W6 v
12.In accordance with the California Business and Professions Code sections 6735,
7835, and 7835.1, all engineering and geologic evaluations and judgments shall
be performed by or under the direction of registered professionals competent and
proficient in the fields pertinent to the required activities. Speck elements of the
SSMP that require professional evaluation and judgments shall be prepared by
or under the direction of appropriately qualified professionals, and shall bear the
professional(s)' signature and stamp.
13.The mandatory elements of the SSMP are specified below. However, if the
Enrollee believes that any element of this section is not appropriate or applicable
to the Enrollee's sanitary sewer system, the SSMP program does not need to
address that element. The Enrollee must justify why that element is not
applicable. The SSMP must be approved by the deadlines listed in the SSMP
Time Schedule below.
Sewer System Management Plan (SSMP)
(i) Goal: The goal of the SSMP is to provide a plan and schedule to properly
manage, operate, and maintain all parts of the sanitary sewer system.
This will help reduce and prevent SSOs, as well as mitigate any SSOs
that do occur.
(ii) Organization: The SSMP must identify:
(a) The name of the responsible or authorized representative as
described in Section J of this Order.
(b) The names and telephone numbers for management,
administrative, and maintenance positions responsible for
implementing specific measures in the SSMP program. The
SSMP must identify lines of authority through an organization chart
or similar document with a narrative explanation; and
(c) The chain of communication for reporting SSOs, from receipt of a
complaint or other information, including the person responsible for
reporting SSOs to the State and Regional Water Board and other
agencies if applicable (such as County Health Officer, County
Environmental Health Agency, Regional Water Board, and/or State
Office of Emergency Services (OES)).
(iii) Legal Authority: Each Enrollee must demonstrate, through sanitary
sewer system use ordinances, service agreements, or other legally
binding procedures, that it possesses the necessary legal authority to:
(a) Prevent illicit discharges into its sanitary sewer system
(examples may include 1/1, stormwater, chemical dumping,
unauthorized debris and cut roots, etc.);
State Water Resources Control Board Order No. 2006-0003-DWQ Page 11 of 20
a Statewide General WDR For Wastewater Collection Agencies 512106
(b) Require that sewers and connections be properly designed
and constructed;
(c) Ensure access for maintenance, inspection, or repairs for
portions of the lateral owned or maintained by the Public
Agency;
(d) Limit the discharge of fats, oils, and grease and other debris
that may cause blockages, and
(a) Enforce any violation of its sewer ordinances.
(iv) Operation and Maintenance Program. The SSMP must include those
elements listed below that are appropriate and applicable to the
Enrollee's system:
(a) Maintain an up-to-date map of the sanitary sewer system,
showing all gravity line segments and manholes, pumping
facilities, pressure pipes and valves, and applicable stormwater
conveyance facilities;
(b) Describe routine preventive operation and maintenance activities
by staff and contractors, including a system for scheduling regular
maintenance and cleaning of the sanitary sewer system with more
frequent cleaning and maintenance targeted at known problem
areas. The Preventative Maintenance (PM) program should have
a system to document scheduled and conducted activities, such
as work orders;
(c) Develop a rehabilitation and replacement plan to identify and
prioritize system deficiencies and implement short-term and long-
term rehabilitation actions to address each deficiency. The
program should include regular visual and TV inspections of
manholes and sewer pipes, and a system for ranking the
condition of sewer pipes and scheduling rehabilitation.
Rehabilitation and replacement should focus on sewer pipes that
are at risk of collapse or prone to more frequent blockages due to
pipe defects. Finally,the rehabilitation and replacement plan
should include a capital improvement plan that addresses proper
management and protection of the infrastructure assets. The plan
shall include a time schedule for implementing the short- and
long-term plans plus a schedule for developing the funds needed
for the capital improvement plan;
(d) Provide training on a regular basis for staff in sanitary sewer
system operations and maintenance, and require contractors to
be appropriately trained; and
State Water Resources Control Board Order No. 2006-0003-DM Page 12 of 20
Statewide General WDR For Wastewater Collection Agencies 512106 0
(a) Provide equipment and replacement part Inventories, including
identification of critical replacement parts.
(v) Design and Performance Provisions:
(a) Design and construction standards and specifications for the
installation of new sanitary sewer systems, pump stations and other
appurtenances; and for the rehabilitation and repair of existing
sanitary sewer systems; and
(b) Procedures and standards for inspecting and testing the installation
of new sewers, pumps, and other appurtenances and for
rehabilitation and repair projects.
(vi) Overflow Emergency Response Plan - Each Enrollee shall develop and
implement an overflow emergency response plan that identifies
measures to protect public health and the environment. At a minimum,
this plan must include the following:
(a) Proper notification procedures so that the primary responders and
regulatory agencies are informed of all SSOs in a timely manner;
(b) A program to ensure an appropriate response to all overflows;
(c) Procedures to ensure prompt notification to appropriate regulatory
agencies and other potentially affected entities (e.g. health
agencies, Regional Water Boards, water suppliers, etc.) of all SSOs
that potentially affect public health or reach the waters of the State
in accordance with the MRP. All SSOs shall be reported in
accordance with this MRP, the California Water Code, other State
Law, and other applicable Regional Water Board WDRs or NPDES
permit requirements. The SSMP should identify the officials who
will receive immediate notification;
(d) Procedures to ensure that appropriate staff and contractor
personnel are aware of and follow the Emergency Response Plan
and are appropriately trained;
(a) Procedures to address emergency operations, such as traffic and
crowd control and other necessary response activities; and
(f) A program to ensure that all reasonable steps are taken to contain
and prevent the discharge of untreated and partially treated
wastewater to waters of the United States and to minimize or
correct any adverse impact on the environment resulting from the
SSOs, including such accelerated or additional monitoring as may
be necessary to determine the nature and impact of the discharge.
State Water Resources Control Board Order No. 2006-0003-0WQ Page 13 of 20
r Statewide General WDR For Wastewater Collection Agencies SW6
(vii) FOG Control Program: Each Enrollee shall evaluate its service area to
determine whether a FOG control program is needed. If an Enrollee
determines that a FOG program is not needed, the Enrollee must provide
justification for why it is not needed. If FOG is found to be a problem, the
Enrollee must prepare and implement a FOG source control program to
reduce the amount of these substances discharged to the sanitary sewer
system. This plan shall include the following as appropriate:
(a) An implementation plan and schedule for a public education
outreach program that promotes proper disposal of FOG;
(b)A plan and schedule for the disposal of FOG generated within the
sanitary sewer system service area. This may include a list of
acceptable disposal facilities and/or additional facilities needed to
adequately dispose of FOG generated within a sanitary sewer
system service area;
(c) The legal authority to prohibit discharges to the system and
identify measures to prevent SSOs and blockages caused by
FOG;
(d) Requirements to install grease removal devices(such as traps or
interceptors), design standards for the removal devices,
maintenance requirements, BMP requirements, record keeping
and reporting requirements;
(e)Authority to inspect grease producing facilities, enforcement
authorities, and whether the Enrollee has sufficient staff to inspect
and enforce the FOG ordinance;
(f) An identification of sanitary sewer system sections subject to
FOG blockages and establishment of a cleaning maintenance
schedule for each section; and
(g) Development and implementation of source control measures for
all sources of FOG discharged to the sanitary sewer system for
each section identified in (f) above.
(viii) System Evaluation and Capacity Assurance Plan: The Enrollee shall
prepare and implement a capital improvement plan (CIP) that will
provide hydraulic capacity of key sanitary sewer system elements for
dry weather peak flow conditions, as well as the appropriate design
storm or wet weather event. At a minimum, the plan must include:
(a) Evaluation: Actions needed to evaluate those portions of the
sanitary sewer system that are experiencing or contributing to an
SSO discharge caused by hydraulic deficiency. The evaluation
must provide estimates of peak flows (including flows from SSOs
State Water Resources Control Board Order No. 2006-0003-DWQ Page 14 of 20
Statewide General WDR For Wastewater Collection Agencies 512106 r
that escape from the system) associated with conditions similar to
those causing overflow events, estimates of the capacity of key
system components, hydraulic deficiencies (including components
of the system with limiting capacity) and the major sources that
contribute to the peak flows associated with overflow events;
(b) Design Criteria: Where design criteria do not exist or are
deficient, undertake the evaluation identified in (a) above to
establish appropriate design criteria; and
(c) Capacity Enhancement Measures: The steps needed to
establish a short-and long-term CIP to address identified
hydraulic deficiencies, including prioritization, alternatives
analysis, and schedules. The CIP may include increases in pipe
size, 1/1 reduction programs, increases and redundancy in
pumping capacity, and storage facilities. The CIP shall include an
implementation schedule and shall identify sources of funding.
(d) Schedule: The Enrollee shall develop a schedule of completion
dates for all portions of the capital improvement program
developed in (a)-(c) above. This schedule shall be reviewed and
updated consistent with the SSMP review and update
requirements as described in Section D. 14.
(ix) Monitoring, Measurement, and Program Modifications: The Enrollee
shall:
(a) Maintain relevant information that can be used to
establish and prioritize appropriate SSMP activities;
(b) Monitor the implementation and, where appropriate,
measure the effectiveness of each element of the
SSMP;
(c) Assess the success of the preventative maintenance
program;
(d) Update program elements, as appropriate, based on
monitoring or performance evaluations; and
(a) Identify and illustrate SSO trends, including:
frequency, location, and volume.
(x) SSMP Program Audits -As part of the SSMP, the Enrollee shall
conduct periodic internal audits, appropriate to the size of the system
and the number of SSOs. At a minimum, these audits must occur every
two years and a report must be prepared and kept on file. This audit
shall focus on evaluating the effectiveness of the SSMP and the
State Water Resources Control Board Order No. 2006-0003-DWQ Page 15 of 20
I Statewide General WDR For Wastewater Collection Agencies 5/2/06
Enrollee's compliance with the SSMP requirements identified in this
subsection (D.13), including identification of any deficiencies in the
SSMP and steps to correct them.
(xi) Communication Program —The Enrollee shall communicate on a
regular basis with the public on the development, implementation, and
performance of its SSMP. The communication system shall provide the
public the opportunity to provide input to the Enrollee as the program is
developed and implemented.
The Enrollee shall also create a plan of communication with systems that
are tributary and/or satellite to the Enrollee's sanitary sewer system.
14.Both the SSMP and the Enrollee's program to implement the SSMP must be
certified by the Enrollee to be in compliance with the requirements set forth
above and must be presented to the Enrollee's governing board for approval at a
public meeting. The Enrollee shall certify that the SSMP, and subparts thereof,
are in compliance with the general WDRs within the time frames identified in the
time schedule provided in subsection D.15, below.
In order to complete this certification, the Enrollee's authorized representative
must complete the certification portion in the Online SSO Database
Questionnaire by checking the appropriate milestone box, printing and signing
the automated form, and sending the form to:
State Water Resources Control Board
Division of Water Quality
Attn: SSO Program Manager
P.O. Box 100
Sacramento, CA 95812
The SSMP must be updated every five (5) years, and must include any
significant program changes. Re-certification by the governing board of the
Enrollee is required in accordance with D.14 when significant updates to the
SSMP are made. To complete the re-certification process,the Enrollee shall
enter the data in the Online SSO Database and mail the form to the State Water
Board, as described above.
15.The Enrollee shall comply with these requirements according to the following
schedule. This time schedule does not supersede existing requirements or time
schedules associated with other permits or regulatory requirements.
State Water Resources Control Board Order No. 2006-0003-DWQ Page 16 of 20
Statewide General WDR For Wastewater Collection Agencies 5/2/06 r
Sewer System Management Plan Time Schedule
Task and Completion Date
Associated Section
Population > Population Population Population <
100,000 between 100,000 between 10,000 2,500
and 10,000 and 2,500
Application for Permit
Coverage 6 months after WDRs Adoption
Section C
Reporting Program Section G 6 months after WDRs Adoption'
SSMP Development 15 months after 18 months after
Plan and Schedule 9 months after 12 months after WDRa WDRs
No specific Section WDRs Adoption'
WDRs Adoption Ado n2 Adoption 2
Goals and
Organization Structure 12 months after WDRs Adoption 18 months after WDRs Adoption
Section D 13(il & f
Overflow Emergency
Response Program
Section D 13 yi
Legal Authority
Section D 13 1 36 months after 39 months after
24 months after 30 months after
Operation and z 2 WDRs WDRs
Maintenance Program WDRs Adoption WDRs Adoption Adoption' Adoption
Section D 13 ily
Grease Control
Program
Section D 13
Design and
Performance
Section D 13 y
System Evaluation and
Capacity Assurance 36 months after 39 months after 48 months after 51 months after
Plan WDRs Adoption WDRs Adoption WDRs Adoption WDRs Adoption
Section D 13 fi
Final SSMP,
incorporating all of the
SSMP requirements
Section D 13
Stale Water Resources Control Board Order No. 2006-0003-DWQ Page 17 of 20
Statewide General WDR For Wastewater Collection Agencies 52M
1. In the event that by July 1, 2006 the Executive Director is able to execute a
memorandum of agreement (MOA) with the California Water Environment
Association (CWEA) or discharger representatives outlining a strategy and time
schedule for CWEA or another entity to provide statewide training on the adopted
monitoring program, SSO database electronic reporting, and SSMP development,
consistent with this Order, then the schedule of Reporting Program Section G shall
be replaced with the following schedule:
Reporting Program
Section G
Regional Boards 4, 6,and 9 6 months after WDRs Adoption
Regional Boards 1, 2, 12 months after WDRs Adoption
and 3
Regional Boards 5, 6, 16 months after WDRs Adoption
and 7
If this MOU is not executed by July 1, 2006, the reporting program time schedule will
remain six (6) months for all regions and agency size categories.
2. In the event that the Executive Director executes the MOA identified in note 1 by
July 1, 2006, then the deadline for this task shall be extended by six (6) months.
The time schedule identified in the MOA must be consistent with the extended time
schedule provided by this note. If the MOA is not executed by July 1, 2006, the six
(6) month time extension will not be granted.
E. WDRs and SSMP AVAILABILITY
1. A copy of the general WDRs and the certified SSMP shall be maintained at
appropriate locations (such as the Enrollee's offices, facilities, and/or Internet
homepage) and shall be available to sanitary sewer system operating and
maintenance personnel at all times.
F. ENTRY AND INSPECTION
1. The Enrollee shall allow the State or Regional Water Boards or their authorized
representative, upon presentation of credentials and other documents as may be
required by law, to:
a. Enter upon the Enrollee's premises where a regulated facility or activity
is located or conducted, or where records are kept under the
conditions of this Order;
b. Have access to and copy, at reasonable times, any records that must
be kept under the conditions of this Order;
State Water Resources Control Board Order No. 2006-0003DWQ Page 18 of 20
Statewide General WDR For Wastewater Collection Agencies &Z06 '
c. Inspect at reasonable times any facilities, equipment (including
monitoring and control equipment), practices, or operations regulated
or required under this Order; and
d. Sample or monitor at reasonable times, for the purposes of assuring
compliance with this Order or as otherwise authorized by the California
Water Code, any substances or parameters at any location.
G. GENERAL MONITORING AND REPORTING REQUIREMENTS
1. The Enrollee shall furnish to the State or Regional Water Board, within a
reasonable time, any information that the State or Regional Water Board may
request to determine whether cause exists for modifying, revoking and reissuing,
or terminating this Order. The Enrollee shall also furnish to the Executive
Director of the State Water Board or Executive Officer of the applicable Regional
Water Board, upon request, copies of records required to be kept by this Order.
2. The Enrollee shall comply with the attached Monitoring and Reporting Program
No. 2006-0003 and future revisions thereto, as specified by the Executive
Director. Monitoring results shall be reported at the intervals specified in
Monitoring and Reporting Program No. 2006-0003. Unless superseded by a
specific enforcement Order for a specific Enrollee, these reporting requirements
are intended to replace other mandatory routine written reports associated with
SSOs.
3. All Enrollees must obtain SSO Database accounts and receive a "Usemame"
and "Password" by registering through the California Integrated Water Quality
System (CIWQS). These accounts will allow controlled and secure entry into the
SSO Database. Additionally, within 30days of receiving an account and prior to
recording spills into the SSO Database, all Enrollees must complete the
"Collection System Questionnaire", which collects pertinent information regarding
a Enrollee's collection system. The "Collection System Questionnaire" must be
updated at least every 12 months.
4. Pursuant to Health and Safety Code section 5411.5, any person who, without
regard to intent or negligence, causes or permits any untreated wastewater or
other waste to be discharged in or on any waters of the State, or discharged in or
deposited where it is, or probably will be, discharged in or on any surface waters
of the State, as soon as that person has knowledge of the discharge, shall
immediately notify the local health officer of the discharge. Discharges of
untreated or partially treated wastewater to storm drains and drainage channels,
whether man-made or natural or concrete-lined, shall be reported as required
above.
Any SSO greater than 1,000 gallons discharged in or on any waters of the State,
or discharged in or deposited where it is, or probably will be, discharged in or on
any surface waters of the State shall also be reported to the Office of Emergency
Services pursuant to Caldomia Water Code section 13271.
State Water Resources Control Board Order No. 2006-0003-DWQ Page 19 of 20
Statewide General WDR For Wastewater Collection Agencies 5/2(06
H. CHANGE IN OWNERSHIP
1. This Order is not transferable to any person or party, except after notice to the
Executive Director. The Enrollee shall submit this notice in writing at least 30
days in advance of any proposed transfer. The notice must include a written
agreement between the existing and new Enrollee containing a specific date for
the transfer of this Order's responsibility and coverage between the existing
Enrollee and the new Enrollee. This agreement shall include an
acknowledgement that the existing Enrollee is liable for violations up to the
transfer date and that the new Enrollee is liable from the transfer date forward.
I. INCOMPLETE REPORTS
1. If an Enrollee becomes aware that it failed to submit any relevant fads in any
report required under this Order, the Enrollee shall promptly submit such fads or
information by formally amending the report in the Online SSO Database.
J. REPORT DECLARATION
1. All applications, reports, or information shall be signed and certified as follows:
(i) All reports required by this Order and other information required by the
State or Regional Water Board shall be signed and certified by a person
designated, for a municipality, state, federal or other public agency, as
either a principal executive officer or ranking elected official, or by a duly
authorized representative of that person, as described in paragraph (ii) of
this provision. (For purposes of electronic reporting, an electronic
signature and accompanying certification, which is in compliance with the
Online SSO database procedures, meet this certification requirement.)
(ii) An individual is a duly authorized representative only if:
(a) The authorization is made in writing by a person described in
paragraph (i) of this provision; and
(b) The authorization specifies either an individual or a position having
responsibility for the overall operation of the regulated facility or
activity.
K. CIVIL MONETARY REMEDIES FOR DISCHARGE VIOLATIONS
1. The California Water Code provides various enforcement options, including civil
monetary remedies, for violations of this Order.
2. The California Water Code also provides that any person failing or refusing to
furnish technical or monitoring program reports, as required under this Order, or
State Water Resources Control Board Order No. 2006-0003-D WQ Page 20 of 20
Statewide General WDR For Wastewater Collection Agencies 5/2/06 '
falsifying any information provided in the technical or monitoring reports is
subject to civil monetary penalties.
L. SEVERABILITY
1. The provisions of this Order are severable, and if any provision of this Order, or
the application of any provision of this Order to any circumstance, is held invalid,
the application of such provision to other circumstances, and the remainder of
this Order, shall not be affected thereby.
2. This order does not convey any property rights of any sort or any exclusive
privileges. The requirements prescribed herein do not authorize the commission
of any act causing injury to persons or property, nor protect the Enrollee from
liability under federal, state or local laws, nor create a vested right for the
Enrollee to continue the waste discharge.
CERTIFICATION
The undersigned Clerk to the State Water Board does hereby certify that the foregoing
is a full, true, and correct copy of general WDRs duly and regularly adopted at a
meeting of the State Water Resources Control Board held on May 2, 2006.
AYE: Tam M. Doduc
Gerald D. Secundy
NO: Arthur G. Baggett
ABSENT: None
ABSTAIN: None
Song Her
Clerk to the Board
1 STATE WATER RESOURCES CONTROL BOARD
MONITORING AND REPORTING PROGRAM NO. 2006-0003-DWQ
STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS
FOR
SANITARY SEWER SYSTEMS
This Monitoring and Reporting Program (MRP) establishes monitoring, record keeping,
reporting and public notification requirements for Order No. 2006-2003-DWQ,
"Statewide General Waste Discharge Requirements for Sanitary Sewer Systems."
Revisions to this MRP may be made at any time by the Executive Director, and may
include a reduction or increase in the monitoring and reporting.
A. SANITARY SEWER OVERFLOW REPORTING
SSO Cateaories
1. Category 1 -All discharges of sewage resulting from a failure in the Enrollee's
sanitary sewer system that:
A. Equal or exceed 1000 gallons, or
B. Result in a discharge to a drainage channel and/or surface water; or
C. Discharge to a storm drainpipe that was not fully captured and returned to
the sanitary sewer system.
2. Category 2—All other discharges of sewage resulting from a failure in the
Enrollee's sanitary sewer system.
3. Private Lateral Sewage Discharges—Sewage discharges that are caused by
blockages or other problems within a privately owned lateral.
SSO Reoortina Tmmeframes
4. Category 1 SSOs—All SSOs that meet the above criteria for Category 1 SSOs
must be reported as soon as: (1) the Enrollee has knowledge of the discharge,
(2) reporting is possible, and (3) reporting can be provided without substantially
impeding cleanup or other emergency measures. Initial reporting of Category 1
SSOs must be reported to the Online SSO System as soon as possible but no
later than 3 business days after the Enrollee is made aware of the SSO.
Minimum information that must be contained in the 3-day report must include all
information identified in section 9 below, except for item 9X A final certified
report must be completed through the Online SSO System, within 15 calendar
days of the conclusion of SSO response and remediation. Additional information
may be added to the certified report, in the form of an attachment, at any time.
The above reporting requirements do not preclude other emergency notification
requirements and timeframes mandated by other regulatory agencies (local
Monitoring and Reporting Program No. 2006-0003-DWQ Page 2 of 5
Statewide General WDRs for Sanitary Sewer Systems 51212006
County Health Officers, local Director of Environmental Health, Regional Water
Boards, or Office of Emergency Services (OES)) or State law.
5. Category 2 SSOs—All SSOs that meet the above criteria for Category 2 SSOs
must be reported to the Online SSO Database within 30 days after the end of the
calendar month in which the SSO occurs (e.g. all SSOs occurring in the month of
January must be entered into the database by March 1 at).
6. Private Lateral Sewage Discharges—All sewage discharges that meet the above
criteria for Private Lateral sewage discharges may be reported to the Online SSO
Database based upon the Enrollee's discretion. If a Private Lateral sewage
discharge is recorded in the SSO Database, the Enrollee must identify the
sewage discharge as occurring and caused by a private lateral, and a
responsible party (other than the Enrollee) should be identified, if known.
7. If there are no SSOs during the calendar month, the Enrollee will provide, within
30 days after the end of each calendar month, a statement through the Online
SSO Database certifying that there were no SSOs for the designated month.
6. In the event that the SSO Online Database is not available,the enrollee must fax
all required information to the appropriate Regional Water Board office in
accordance with the time schedules identified above. In such event, the Enrollee
must also enter all required information into the Online SSO Database as soon
as practical.
Mandatory Information to be Included in SSO Online Reporting
All Enrollees must obtain SSO Database accounts and receive a "Usenname" and
"Password" by registering through the California Integrated Water Quality System
(CIWQS). These accounts will allow controlled and secure entry into the SSO
Database. Additionally, within thirty (30) days of receiving an account and prior to
recording SSOs into the SSO Database, all Enrollees must complete the "Collection
System Questionnaire", which collects pertinent information regarding an Enrollee's
collection system. The "Collection System Questionnaire" must be updated at least
every 12 months.
At a minimum,the following mandatory information must be included prior to finalizing
and certifying an SSO report for each category of SSO:
9. Category 2 SSOs:
A. Location of SSO by entering GPS coordinates;
B. Applicable Regional Water Board, i.e. identify the region in which the
SSO occurred;
C. County where SSO occurred;
D. Whether or not the SSO entered a drainage channel and/or surface
water;
E. Whether or not the SSO was discharged to a stone drain pipe that
was not fully captured and returned to the sanitary sewer system;
Monitoring and Reporting Program No. 2006-0003-DWQ Page 3 of 5
Statewide General WDRs for Sanitary Sewer Systems 5/2/2006
F. Estimated SSO volume in gallons;
G. SSO source (manhole, cleanout, etc.);
H. SSO cause (mainline blockage, roots, etc.);
I. Time of SSO notification or discovery;
J. Estimated operator arrival time;
K. SSO destination;
L. Estimated SSO end time; and
M. SSO Certification. Upon SSO Certification, the SSO Database will
issue a Final SSO Identification (ID) Number.
10.Private Lateral Sewage Discharges:
A. All information listed above (if applicable and known), as well as;
B. Identification of sewage discharge as a private lateral sewage
discharge; and
C. Responsible party contact information (if known).
11.Category 1 SSOs:
A. All information listed for Category 2 SSOs, as well as;
B. Estimated SSO volume that reached surface water, drainage
channel, or not recovered from a storm drain;
C. Estimated SSO amount recovered;
D. Response and corrective action taken;
E. If samples were taken, identify which regulatory agencies received
sample results (if applicable). If no samples were taken, NA must
be selected.
F. Parameters that samples were analyzed for(if applicable);
G. Identification of whether or not health warnings were posted;
H. Beaches impacted (if applicable). If no beach was impacted, NA
must be selected;
I. Whether or not there is an ongoing investigation;
J. Steps taken or planned to reduce, eliminate, and prevent
reoccurrence of the overflow and a schedule of major milestones for
those steps;
K. DES control number (if applicable);
L. Date DES was called (if applicable);
M. Time OES was called (if applicable);
N. Identification of whether or not County Health Officers were called;
O. Date County Health Officer was called (if applicable); and
P. Time County Health Officer was called (if applicable).
Reporting to Other Regulatory Agencies
These reporting requirements do not preclude an Enrollee from reporting SSOs to other
regulatory agencies pursuant to California state law. These reporting requirements do
not replace other Regional Water Board telephone reporting requirements for SSOs.
Monitoring and Reporting Program No. 2006-0003-DWQ Page 4 of 5
Statewide General WDRs for Sanitary Sewer Systems 5/2/2006
r
1. The Enrollee shall report SSOs to DES, in accordance with California Water
Code Section 13271.
Office of Emergency Services
Phone (800) 852-7550
2. The Enrollee shall report SSOs to County Health officials in accordance with
California Health and Safety Code Section 5410 at seq.
3. The SSO database will automatically generate an e-mail notification with
customized information about the SSO upon initial reporting of the SSO and final
certification for all Category 1 SSOs. E-mails will be sent to the appropriate
County Health Officer and/or Environmental Health Department if the county
desires this information, and the appropriate Regional Water Board.
B. Record Keeping
1. Individual SSO records shall be maintained by the Enrollee for a minimum of five
years from the date of the SSO. This period may be extended when requested
by a Regional Water Board Executive Officer.
3. All records shall be made available for review upon State or Regional Water
Board staffs request.
4. All monitoring instruments and devices that are used by the Enrollee to fulfill the
prescribed monitoring and reporting program shall be properly maintained and
calibrated as necessary to ensure their continued accuracy;
5. The Enrollee shall retain records of all SSOs, such as, but not limited to and
when applicable:
a. Record of Certified report, as submitted to the online SSO database;
b. All original recordings for continuous monitoring instrumentation;
C. Service call records and complaint logs of calls received by the Enrollee;
d. SSO calls;
e. SSO records;
f. Steps that have been and will be taken to prevent the SSO from recurring
and a schedule to implement those steps.
g. Work orders, work completed, and any other maintenance records from
the previous 5 years which are associated with responses and
investigations of system problems related to SSOs;
h. A list and description of complaints from customers or others from the
previous 5 years; and
i. Documentation of performance and implementation measures for the
previous 5 years.
6. If water quality samples are required by an environmental or health regulatory
agency or State law, or if voluntary monitoring is conducted by the Enrollee or its
agent(s), as a result of any SSO, records of monitoring information shall include:
Monitoring and Reporting Program No. 2006-0003-DWQ Page 5 of 5
Statewide General WDRs for Sanitary Sewer Systems 5/2/2006
a. The date, exact place, and time of sampling or measurements;
b. The individual(s)who performed the sampling or measurements;
C. The date(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical technique or method used; and,
f. The results of such analyses.
C. Certification
t. All final reports must be certified by an authorized person as required by
Provision J of the Order.
2. Registration of authorized individuals, who may certify reports, will be in
accordance with the CIWQS' protocols for reporting.
Monitoring and Reporting Program No. 2006-0003 will become effective on the date of
adoption by the State Water Board.
CERTIFICATION
The undersigned Clerk to the Board does hereby certify that the foregoing is a full, true,
and correct copy of a resolution duly and regularly adopted at a meeting of the State
Water Board held on May 2, 2006.
Song Her
Clerk to the Board
MINUTES OF PLANNING. DESIGN, AND CONSTRUCTION
COMMITTEE MEETING
Orange County Sanitation District
Thursday, October 5, 2006, at 5:00 p.m.
A meeting of the Planning, Design,and Construction Committee of the Orange County
Sanitation District was held on Thursday, October 5, 2006,at 5:00 p.m., at the Sanitation
District's Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
PDC COMMITTEE MEMBERS:
Staff Present:
Directors Present: Jim Ruth, Interim General Manager
Tod Ridgeway, Chair Bob Ghirelli,Acting Assistant General Manager
Norm Eckenrode,Vice Chair David Ludwin, Director of Engineering
Charles Antos John Linder, Engineering Manager
Larry Crandall Matt Smith, Engineering Manager
Patsy Marshall Chris Cervellone, Engineering Supervisor
Roy Moore Chuck Winsor, Engineering Supervisor
Doug Davert, Board Vice Chair Larry Gibson, Engineering Supervisor
Steve Anderson Olga Cervantes, Contracts Supervisor
Penny Kyle, Committee Secretary
Directors Absent:
Alberta Christy Others Present:
Harry Sidhu
Jim Ferryman, Board Chair
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were none.
(4) REPORT OF THE COMMITTEE CHAIR
Committee Chair Tod Ridgeway did not give a report.
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager,did not give a report.
PDC Committee Minutes
Page 2
October 5, 2006
(6) REPORT OF THE DIRECTOR OF ENGINEERING
David Ludwin, Director of Engineering, reported that staff had been recently Interviewed by a
senior editor from Engineering News Record, a construction oriented periodical, regarding the
Sanitation District's capital program, and the article should be published during October.
The Committee was advised that a peer review using the American Society of Civil Engineers
had begun on the engineering department's management procedures with regard to the capital
program, and a report will be presented to the committee in the near future.
Mr. Ludwin also noted that the plans and specifications were almost complete for secondary
treatment expansion at Plant 1 and advertising for bids would occur in the next few weeks and
bids received in February.
(7) REPORT OF GENERAL COUNSEL
General Counsel was not present.
(8) CONSENTCALENDAR
a. Approve minutes of the September 14, 2006 Planning, Design, and Construction
Committee Meeting.
b. PSA AND AMENDMENT REPORT
There were no PSAs and no Amendments approved by the General Manager from
August 24 through September 21, 2006.
C. FACILITIES ENGINEERING CONSULTANT ACTIVITY REPORT
This report is an information only item.
d. QUARTERLY GROUNDWATER REPLENISHMENT SYSTEM (GWRS) STATUS
REPORT
This is an information only item.
MOTION: It was moved, seconded, and duly carried to approve the recommended actions
specified as Items 8(a)through (d).
END OF CONSENT CALENDAR
(9) ACTION ITEMS
a. PDC06-101 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to accept Plant No. 1, Plant Water VFD Replacement, Job
No. SP-94, as complete, authorizing execution of the Notice of
Completion and approving the Final Closeout Agreement with Shasta
Electric, LP.
PDC Committee Minutes
v Page 3
October 5, 2006
b. PDCO6-102 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to(1)Approve plans,specifications,and addenda for P1 HR
Building Fire Lane Access&Additional Parking, Job No. FE05-17,on file
at the office of the Board Secretary;
(2) Receive and file bid tabulation;
(3) Reject all bids for P1 HR Building Fire Lane Access &Additional
Parking;and,
(4)Authorize readvertising for P1 HR Building Fire Lane Access &
Additional Parking, Job No. FE05-17R.
C. PDCO6-103 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify Change Order No. 3 to Headworks Improvements at
Plant No. 2,Job No. P2-66, with J.F. Shea Construction, Inc.,authorizing
an addition of$416,788 and 32 calendar days, increasing the total
contract amount to $193,141,700.
d. PDCO6-104 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify Change Order No.29 to Primary Clarifiers 16-31 and
Related Facilities, Job No. P1-37,with Margate Construction, authorizing
an addition of$67,329, increasing the total contract amount to
$72.827,486.
e. PDCO6-105 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to(1) Ratify Change Order No. 1 to Laboratory Rehabilitation,
Job No. J-88,with Dalke& Sons Construction, Inc., authorizing an
addition of$28,657 and 214 calendar days, increasing the total contract
amount to$671,937; and,
(2)Accept Laboratory Rehabilitation,Job No. J-88, as complete,
authorizing execution of the Notice of Completion and approving the Final
Closeout Agreement with Dalke& Sons Construction, Inc.
f. PDCO6-106 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to(1) Ratify Change Order No. 12 to Gisler-Redhill Trunk
Improvements, Reach "A°, Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill North Trunk
Improvements, Contract No. 741; and City of Tustin Project Nos. 6106
and 6151 with ARB, Inc., authorizing a deduction of$39,575, reducing the
total contract amount to$21,963,535;
(2) Ratify a Unilateral Change Order No. 13,authorizing an addition of
$439,935, increasing the total contract amount to $22,403,470; and,
I
PDC Committee Minutes
Page 4
October 5, 2006
(3)Accept Gisler-Redhill Trunk Improvements, Reach"A", Contract
No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-Redhill
North Trunk Improvements, Contract No. 741;and City of Tustin Project
Nos. 6106 and 6151, as complete,authod2ing execution of the Notice of
Completion.
g. PDC06-107 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to(1)Approve a budget increase of$38,235 for Supplement
No. 1 to the 1999 Strategic Plan Final Program Environmental Impact
Report,Job No.J-40-5, for a total project budget of$946,235; and,
(2)Approve Amendment No. 5 to the Professional Services Agreement
with Environmental Science Associates, providing for additional
environmental services for an additional amount of$5,706, increasing the
total amount not to exceed $574,206.
(10) CLOSED SESSION
There was no closed session.
(11) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There were none.
(12) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(14) FUTURE MEETINGS DATES
The next Planning, Design, and Construction Committee Meeting is scheduled for Thursday,
November 2, 2006 at 5:00 p.m.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 5:24 p.m.
Submitted by:
Penny M. Ky e
Committee Secretary
H:`dePfi9=11W161W\M1nur9s\100508 PDC Minutes Drakdac
PDCCOMMITTEE M-be 9Dare To6d.ofDir.
10/05/06 10/25/06
AGENDA REPORT Item Number Item Number
i�DCD6-tol 11(b)
Orange County Sanitation District
®Utility systems
FROM: David Ludwin, Director of Engineering
Originator: Alberto Acevedo, Project Manager
SUBJECT: PLANT NO. 1, PLANT WATER VFD REPLACEMENT, JOB NO. SP-94
GENERAL MANAGER'S RECOMMENDATION
Accept Plant No. 1, Plant Water VFD Replacement, Job No. SP-94, as complete,
authorizing execution of the Notice of Completion and approving the Final Closeout
Agreement with Shasta Electric, LP.
SUMMARY
The project included replacing the existing three plant water pump motor drives (VFDs)
at Plant No. 1.
The Plans and Specifications were completed by SPEC Services, Inc. in November
2004 and the construction contact was awarded to Shasta Electric, LP on
February 23, 2005.
There are no change orders associated with this project. The contract does include
liquidated damages of$500 per day and no bonus provisions. The project is now 100%
complete.
PRIOR COMMITTEEIBOARD ACTIONS
The contract was awarded by the Board of Directors on February 23, 2005.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $630,450
Previously Authorized Change Order $ 0.00
This Change Order (Add) $ 0.00
Change Orders to Date $ 0.00
Percent Increase to Date 0.00%
Amended Contract Price $630,450
Page 1
BUDGET IMPACT ..�
® This item has been budgeted. (Line item: Section 8, 2004-05 Budget Book, Page 99)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Contact Schedule
Contact start date May 19, 2005
Original contact completion date August 9, 2006
Total number of change orders to date 0
Current contact completion date August 9, 2006
Days subject to liquidated damages 0
ALTERNATIVES
N/A
CEQA FINDINGS
A Notice of Exemption was fled with the Clerk-Recorder of the County of Orange on
May 6, 2004, for the completion of the work under this contract.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
DR:dm:kf
RWglobaMgenda Draft ReponsTDMSP-94 AR CON 100506.dao
Page 2
BUDGET INFORMATION TABLE
PLANT NO. 1 PLANT WATER VFD REPLACEMENT
JOB NO. SP-94
(PROJECT CLOSEOUT)
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS TRIS ESTIMATED 1
- PROJECT ` PROPOSED TOTAL
PROJBCTRASK AUTHORIZED BUDGET REVISED AUTHORO'EDTO AUTHORR TION EXPENDITURE TO
BUDGET AUTHORIZATION
BUDGET(OG05) (05103) INCREASE BUDGET DATE - REQUEST DATE
1
Ph..1-P dD men[ $ - S 1 ow $ - S 1.000 S two S - $ 1.000 3 1.430 143%
Phase 2.PmUmmag Design 3 2,000 S 26,000 S - S 28000 S 26.000 S - 3 28,000 3 28567 111%
Phase 3.Dn n 3 345,000 $ 194.000 S -is 154.000 3 194000 S - S 194m 3 233A13 121%
Phase 4-Conbuc00n 3 1554D00 3 1,002000 $ 1,002.000 a 3 1,001450 S - S 1.001450 S 321705 an
Ph 6-Comm"iwkmg S 6A000 3 64.000 S 64,000 ;" 3 63.wo $ 63,000 3 Toss 11%
Phew B-ClweoMl E 23,000 3 23.00D - 3 23AD0 S 23.000 $ 23,000 S 1 W 6%
Conti $ 237000 S 237,000 S 237.000 $ - 5 0%
PROJECT TOTAL i 2,224,000 S 1,547,000 S - E 1,647,000 '. E 1,303.150 E - $ 1,308950 $ 1,094,170 31%
Reimbursable Cos%
PROJECT NET $ 2324,DOD 1 $ 1,547,000 1 S - E 1,547,000 k, E 1,306.450 1 E - 3 1,308450 1 S 1,094,1I8 04%
Dwi nPSA $ 1150fi4 $ - S 115,081 is' S 115.664 1$ - S 11EMI $ 115,664 100%
Do.bvdo0 C.I.d S 630,450 1 E 630,450 ry S 600.450 $ -Is 630A50 E 610.061 96%
EOMS:w llw
CHANGE ORDER STATUS REPORT
PLANT NO. 1, PLANT WATER VFD REPLACEMENT
JOB NO. SP-94
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(DAYS) (DAYS)
CONTRACT 5/23/2005 $630,450 $630,450 0 448 448
EDMS 003811768
PDC COMMITTEE Meelinp Dale Ta W.GrDlr.
10105/05 1025M
AGENDA REPORT Rem Number Ilem Number
PDC(M-102 11(c)
Orange County Sanitation District
misc.A
1�y support Projects
FROM: David Ludwin, Director of Engineering
Originator: Christopher MacLeod, Project Manager
SUBJECT: P1 HR BUILDING FIRE LANE ACCESS &ADDITIONAL PARKING,
JOB NO. FE05-17
GENERAL MANAGER'S RECOMMENDATION
(1) Approve plans, specifications and addenda for Pi HR Building Fire Lane Access &
Additional Parking, Job No. FE05-17, on file at the office of the Board Secretary;
(2) Receive and file bid tabulation; (3) Reject all bids for P1 HR Building Fire Lane
Access &Additional Parking; and (4)Authorize readvertising for P1 HR Building Fire
Lane Access &Additional Parking, Job No. FE05-17R.
SUMMARY
• This project creates a 25-foot wide fire lane access west of the Human Resources
Building, required by the City of Fountain Valley Fire Department, and creates
three new parking spaces out of the adjacent turf area. Additionally, it removes
four turf areas within the Plant No.1 process area parking lot replacing them with
AC pavement, creating approximately 1,500 sq. ft. of additional parking and
maneuvering space; it constructs three speed bumps along Fuentes Drive south of
Streed Parkway; it replaces existing high maintenance landscaping adjacent to the
Administration Building with low maintenance plants and hardscape; it adds 17
parking spaces along Streed Parkway; and it reconfigures the Administration
Building parking lot to accommodate the proposed Ellis Pump Station project.
• The contract performance criteria requirements were developed by Sanitation
District staff. These requirements were conformed into a bid document that was
publicly advertised for bid.
• One bid was received on August 8, 2005. Information summary for Job
No. FE05-17 budget and bid is as follows:
Project Budget: $ 599,885
Construction Budget: $ 500,000
Engineer's Estimate: $ 443,000
Sole Bid: $ 440,000
Number of Bids: 1
Pagel
• After bidding, District staff contacted all five of the bid document holders. In
general, the bidders believed the project had become too complicated for them
(paving contractors) with addition of the landscape work. A subsequent
advertisement should entertain a different group of bidders with the ability to
completely perform both landscape and paving activities.
• Based on the Contracts Administration Bid Evaluation Memo, wherein the sole bid
was found to not be a responsive bid, the Director of Engineering recommends
rejecting all bids.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
® This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
None
ALTERNATIVES
Accept the bid and negotiate with a new contractor to the District to cure the bid
presented for this project.
CEQA FINDINGS
Exempt under Section 15301 — Existing Facilities.
ATTACHMENTS
1. Budget Information Table
2. Bid Tabulation
3. Bid Summary
CM:bm
EDMS:003815364
WntglabahAgenda Draft Rep ;IslPDCWE05-17 Agenda Repod(Reject Bids 20M08-23).dw
Page 2
BUDGET INFORMATION TABLE
P1 HR BUILDING FIRE LANE ACCESS AND ADDITIONAL PARKING
JOB NO. FE05-17
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE UPENDED TO
BUDGET BUDGET INCREASE IOECREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%(
Phase 1 -Pmject Devebpmenl
S S - S - $ - S
Phase 2-Prslimmar Design
S - S - 5 - $ $ - S - S - 5
Phase]-Desgn S 24.405 $ 57205 $ - S 57.205 S 57.205 S - S 57.205 S 61.900 108%
Phase C-Constmcbon S 141,470 S 542.680 $ - S 542,680 5 42.680 5 - S 42,680 S 2,800 7%
Phase 5-Commissionirg
S - 5 - S - $ S - S - $ - S
Phau6-Gbu-0ut S - 5 - S - S S - S - S - S
Phase 7-CanBrperwy S 16,800 $ - $ - S
PROJECT TOTAL S 182.675 S 599.885 S - $ 599,885 S 99.885 S - $ 99,885 $ 64,700 0%
Reimbursable Casts
PROJECT NET S 182.675 S 599.865 1 $ - S 599.005 I I $ 99.885 1 S - S 99,885 1 S 6,11.700 1 0%
PSA/Co.bact
Desgn PSA(COSD In-Fbusel $ - S - S - $ $ - 8 - $ - $
Consbuclion Con9act S 112.000 $ 500,000 1$ - S 500,000 11 S - IS
EDMS=815365
FEO ll&U2M HmnMm Te pv 1.1,
0
ORANGE COUNTY SANITATION DISTRICT
BID TABULATIONS
CAPITAL IMPROVEMENTS PROGRAM CONSTRUCTION CONTRACTS
JOB NO. FE05-17
PLANT NO. 1 HR BUILDING FIRE LANE ACCESS &ADDITIONAL PARKING
August 8, 2006
11:00 a.m.
Total Addenda: 6
Engineer's Estimate: $443,000 Budget: $500,000
CONTRACTOR TOTAL BID
1. Big Ben, Inc. $ 440,000
The Bid Evaluation Team has determined that Big Ben, Inc. is a non-responsive bidder. A
recommendation is made to reject the bid subject to concurrence of the Board of Directors.
Michele Stitzel
SENIOR CONTRACT ADMINISTRATOR
Contracts, Purchasing & Materials Management
MS:CM:II
EDMS:0 MIU89
Page 1 d 1
SCHEDULE OF PRICES COMPARISON File code 7 a.4a
BIB Ban,Inc. COMPANY NAME COMPANY NAME
Item Approx. Oty Unit Total Unit Total Unit Total
No. Price Price Price Price Price Price
1 1 Lump Sum $25,000.00 $ 25.000.00 $ $ - $ - $ -
2 1 Lump Sum $ 409,000.00 E $ - $ - $ -
3 1 Lump Sum $ 2,000.00 $ 2,000.00
4 1 Lump Sum $ 3,000.00 $ 3.000.00
5 1 Lump Sum $ 1,000.00 $ 1,000.00
'Add (+)or Delete (-) $ - $ - $ -
YP�IAm`Iltito► 1�fE .g c It 440.*-W 1 $ . $,
Page 1 of 1 Revision 082205
l PDC COMMITTEE Meeting Date TO ad.o(Dir.
10/06/06 10/26/06
AGENDA REPORT Item Number Item Number
PDC06-103 11(d)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Pam Koester, CIP Project Manager
SUBJECT: HEADWORKS IMPROVEMENTS AT PLANT NO. 2, JOB NO. P2-66
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 3 to Headworks Improvements at Plant No. 2, Job No. P2-66,
with J.F. Shea Construction, Inc., authorizing an addition of$416.788, and 32 calendar
days, increasing the total contract amount to $193,141,700.
SUMMARY
• Job No. P2-66 provides for the construction of a new 340 mgd Headworks facility
which includes new odor control facilities and a new power facility (Power Building
E).
• Carollo Engineers prepared the plans and specifications and the contract was
awarded to J.F. Shea Construction, Inc. on May 25, 2005.
• Change Order No. 3 includes seven items of added work, three items of deleted
work, and a time extension. There are two reimbursable design errors and five
nonreimbursable design errors associated with this change order. Liquidated
damages for this contract are $6,000 per day and no bonus provisions. The project
is now 25% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on May 25, 2005. Please refer to
the attached Change Order Status Report for information on all previous change orders.
PROJECTICONTRACT COST SUMMARY
Original Contract Price $ 192,296,073
Previously Authorized Changes $ 428,839
This Change (Add) $ 416,788
Change Orders to Date $ 845,627
Percentage Increase to Date 0.44%
Amended Contract Price $ 193,141,700
aw,•� w� Page 1
BUDGETIMPACT
® This item has been budgeted. (Line item: Section 8- Page 50)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item).
ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date September 15, 2005
Original Contract Completion Date February 8, 2011
Total Number of Change Orders to Date 3
Current Contract Completion Date March 12, 2011
Actual Contract Completion Date N/A
Days subjected to Liquidated Damages N/A
Change Order No. 3 Content
Item
No. Description Amount Days Type
1 Pipe Encasement Changes $2,821 0 Nonreimbursable Design Error
2 Cover Plate Modification $6,128 0 Nonreimbursable Design Error
Staff Requested Design
3 Checker Plate Changes $1,790 0 Change
Lighting Deletion on Access Staff Requested Design
4 1 Road ($45,230) 0 1 Change
5 Additional Horizontal Rebar $13,367 0 Nonreimbursable Design Error
Roof and Drain Pipe Staff Requested Design
6 Changes ($28,160) 0 Change
36-Inch Storm Drain
7 Encasement $13,747 0 Nonreimbursable Design Error
Seal Emergency Sand Boil
8 #01 $228,160 32 Reimbursable Design Error
Seal Emergency Sand Boil
9 #02 $219,342 0 Reimbursable Design Error
10 Provision of Kirk Keys $8,403 0 Nonreimbursable Design Error
Total Change Order No. 3 $416,788 32
Item No. 8 involves additional costs and a time extension of 32 days to the contract. On
December 29, 2005, a sand boil developed within the floor of the 132-66 excavation at
the location of an exploratory soil boring drilled during design. This occurrence allowed
Page 2
water from the confined Talbert Aquifer to flood the construction site and stop activities
on the critical path of the construction schedule. The Contractor initiated emergency
work to locate additional materials, install a 65-foot long, 48-inch casing pipe vertically
to contain the flowing groundwater and seal the hole using tremmie grout methods. The
incident appears to have been caused by the failure to properly seal the exploratory soil
boring. This item is considered a reimbursable design error and the Sanitation District
will be seeking reimbursement from the design consultant.
Item No. 9 involves additional costs to the contract. On June 7, 2006, a sand boil
developed within the floor of the P2-66 excavation at the location of an exploratory soil
boring drilled during design, allowing water from the confined Talbert Aquifer to flood the
construction site. The Contractor initiated emergency work to locate additional
materials, install a 65-foot long, 48-inch casing pipe vertically to contain the flowing
groundwater and seal the hole using tremmie grout methods. Unlike the previous
occurrence, no time delay was incurred to the project schedule as other activities on the
critical path continued. The incident appears to have been caused by the failure to
properly seal the exploratory soil boring. This item is considered a reimbursable design
error and the Sanitation District will be seeking reimbursement from the design
consultant.
ALTERNATIVES
None
CEQA FINDINGS
Replacement of the Plant No. 2 Headworks was not included in the 1999 Strategic Plan
Program Environmental Impact Report (EIR). A subsequent EIR to the 1999 Strategic
Plan Program EIR was approved by the Sanitation District's Board of Director in April
2004.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order
AA:TH:dm:lg:eh:lg
H:WgloS Mgenda Draft RepodsWDC%PM6 AR CO# 100506.do
...e. ovo 3 Page 3
BUDGET INFORMATION TABLE
HEADWORKS REPLACEMENT AT PLANT NO. 2
JOB NO. P2-66
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE BUDGET DATE REGUEST AUTHORIZATION TO DATE DATE(%)
/DECREASE
Phase l-Proect Devela ment S 57,999 5 64398 S 64.398 S 64398 S 64.398 5 64.398 100%
Phase 2-Prelimehaq DeaW S 92.400 S 1903]23 5 3,903.723 5 3.903.723 S 3,903.723 S 3.903,723 100%
Phase 3-Design S 45OA01 $ 14,995.507 S 14,995.607 $ 14.995.fi02 $ 14.995.W7 S 14,975.078 100%
Phase 4-Construction S 1399.600 S 218,655,712 S 416.788 S 219,072500 S 2111.655.712 S 416.788 S 219.072.500 $ 40894,895 19%
Phase 5-Commissom $ 8.580,219 S 8,580.219 $ 8580.219 S 8.580319 S 17.386 11%
Phase 6-Close-Out $ 216941 S 216.941 5 216.941 $ 216.941 S 238 m
Phase]-Ccnbn enry S 11345000 S 416.788 S 10.928212 $
PROJECT TOTAL 5 2400400 $ 2579761600 S - 5 257 761 600 S 246.416.600 5 416.788 S 246.833.388 S 59,858,718 24%
Reimbursable Costs
PROJECT NET S 2400.400 S 257,761,600 S - $ 257,761fi00 I I S 246.41600 S 416,288 $ 246.533,388 S $9.858715 24%
PSA/Contract
iDeseanPSA $ 26,740.004 S 26.740004 11 S 26.740.004 S 26.740.004
Conslution ConMwB 3 192.724,912 S 416,760 S 193.141 700 11 S 192.724.912 S 416.788 $ 193.141700
EDMS 0 MIM10
CHANGE ORDER STATUS REPORT
Headworks Improvement at Plant No. 2
Job No. P2-66, Change Order No. 3
CUMULATIVE AUTHORIZED AUTHORIZED TIME
APPROVAL CONTRACT CONTRACT COST PERCENTAGE
ITEM DATE COST TO DATE INCREASE/ TIME TO DATE
(DAYS) (DAYS)
DECREASE
CONTRACT $192,296,073 $192.296,073 0.00 1973 1973
CO NO. 1 4/21/2006 $72,192 $192,368,265 0,04% 0 1973
CO No. 2 5/24/2006 S356,647 S192.724.912 0.22% 0 1973
CON,. 3 1 Pe1tli19 1 $416,788 1 $193,141,700 0.44% 1 32
EDMS: 003815503
CHANGE ORDER PERFORMANCE REPORT
HEAOWORKS IMPROVEMENTS AT PLANT NO,2.
JOB NO.P2.86,CHANGE ORDER NO.3
CoNmdor:JF SHEA,CONSTRUCTION,INC. Project Cetopq EXPANSION
Design ConsuBenl:CARDLLO ENGINEERS ConVad%Complete'.25% Od9lnal Contract Pdoe: $192296.0"
CHANGE ORDER TYPES TRACKED INFORMATION OM.Y
Relrehunable Design NoroRelabumabm Subbdal CO TTPn
Me.ContlMon MMRpuesmdCMnge Ene Design Errors Tracked' me, Taltl
re rro
CMnge ONere Ea 0.00% I$75,180) 41.M% S447,SD2 0.23% $44,466 0.02% $416,768 0,22% $0 0.00% 5416.]88 0.22%
Bile ParlOd
Change OMmb 512.216 0.01% $22.494 0.01% so 0.00% $394,12] 02=% $428,839 0.22% $0 0.00% 5428,839 0.22%
Dam
Change Order Tobl $12.210 0.01% ($52,686) 4.03% S447,502 0.23% 54M,503 0. %1 5846,627 0.44% $0 0.00% S845,627 0.44%
program <3.00% e1.00% DDM <1.00% <5.0m 0.00% <a.00%
Pedorreence Goola
The CMrpe ONer ManepareaH PM trerka me prem®rq rourd,n9e weer 12Pee
Version W112006
EDM6'. DMWlWW5
Page 1 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor: J.F. Shea Construction Inc C.O. No.: Three(3)
Date: October 5. 2006
Job: Plant No.2 Headworks Replacement Job No P2-66
Consultant: Carollo Engineers
Amount of this Change Order (Add) $416,788.00
In accordance with contract provisions,the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 —PIPE ENCASEMENT CHANGES
This item is for labor, material, and equipment to change the size of the reinforcing steel from#4 bars
to#6 bars contained in 113.5 linear feet of concrete encasement around the 108-inch Primary Effluent
(PE) pipeline between STA 10+23.28 and STA 11+36.78. The change was required to correct the
original design that depicted inadequate longitudinal reinforcement. The work associated with this
change order item was performed on a "time and material basis" pursuant to Section 44 C (2) of the
General Requirements(Reference FCO-P266-8).
ADDED COST THIS CHANGE ORDER ITEM: $2,821.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2—COVER PLATE MODIFICATION
This item is for labor, material, and equipment to add stainless steel nuts and fabricated I'rfting handles
for placing or removing the galvanized steel deck cover plates for Buildings 3, 5, and 6. The added
work was required to allow removal of the heavy plates by equipment such as a forklift. The removal
of the cover plates is necessary to permit access for maintenance of equipment below. The work
associated with this change order item was negotiated with the Contractor pursuant to Section 44 C
(1)of the Contract General Requirements(Reference FCO-P266-9 and J.F. Shea's cost proposal
dated April 19,2006).
ADDED COSTS THIS CHANGE ORDER: $6,128.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 2 of 7
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Three 3
Date: October 5, 2006
Job: Plant No. 2 Headworks Replacement, Job No. P2-66
Consultant: Carollo Engineers
ITEM 3—CHECKER PLATE CHANGES
This Rem is for labor, material and equipment to substitute 3/8-inch,type 304 stainless steel checker
plate in lieu of specified 1/2-inch,type 316 stainless steel checker plate. The work was required since
the specified 1/2-inch, Type 316 stainless steel checker plate was not available. This Rem also
includes modifications to improve the method of attaching the plates to the pavement. The work
associated with this change order Rem resulted in a credit that was negotiated with the Contractor
pursuant to Section 44 C (1) of the Contract General Requirements (Reference FCO-P266-11 and
J.F. Shea's cost proposal dated March 27, 2006).
ADDED CREDIT THIS CHANGE ORDER: ($1,790.00)
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
ITEM 4—LIGHTING DELETION ON ACCESS ROAD
This Rem involves the deletion of the road lighting and associated power(duct bank)along the
temporary access road. Staff determined that it would be cost effective to delete this work after R was
determined that the lighting was not necessary for a temporary access road and would conflict with
the future construction of the new secondary treatment facilities (Project P2-90) scheduled to begin
construction in 2007. The work associated with this change order Rem resulted in a credit that was
negotiated with the Contractor pursuant to Section 44 C (1) of the Contract General Requirements
(Reference FCO-P266-12 and J.F. Shea's cost proposal dated January 23, 2006).
ADDED CREDIT THIS CHANGE ORDER: ($45,230.00)
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
ITEM 5—ADDITIONAL HORIZONTAL REBAR
This Rem is for labor, material,and equipment to install additional horizontal reinforcement at the
Influent Metering Structure(Building 2), Grit Basins(Building 6), Primary Influent Metering Structure
(Building 9), and Waste Side Stream Pump Station C (Building 14). The work was necessary to
correct the omission of required horizontal reinforcement steel in the original contract drawings. The
work will ensure proper structural integrity at the concrete slab to wall joints. The work associated
with this change order item was negotiated with the Contractor pursuant to Section 44 C (1)of the
Contract General Requirements (Reference FCO-P266-13 and J.F. Shea's cost proposal dated
June 1, 2006).
ADDED COST THIS CHANGE ORDER: $13.367.00
r
Page 3 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Three 3
Date: October 5, 2006
Job: Plant No. 2 Headworks Replacement, Job No. 132-66
Consultant: Carollo Engineers
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 4 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction Inc. C.O. No.: Three 3
Date: October 5. 2006
Job: Plant No. 2 Headworks Replacement Job No. P2-66
Consultant: Carollo Engineers
ITEM 6—ROOF AND DRAIN PIPE CHANGES
This item is for labor, material, and equipment to provide No Hub Cast Iron Soil Pipe(HSP)for
exposed floor and roof drains (that are less than or equal to 4 inches diameter) in lieu of the specified
Ductile Iron Pipe(DI)for all locations except the Ferric Chloride and Odor Control Facilities, where the
pipe material shall remain PVC. The substitution work was requested by the contractor since the
specified DI pipe is difficult to obtain for the required 3-inch floor drain, and although available in the
4-inch size for the roof drains, No Hub Cast Iron Soil pipe is an acceptable and less costly aRemative
for drains equal to or less than 4 inches in diameter. The work associated with this change order item
resulted in a credit that was negotiated with the Contractor pursuant to Section 44 C (1)of the
Contract General Requirements(Reference FCO-P266-15 and J.F. Shea's cost proposal dated May
11, 2006).
ADDED CREDIT TO THIS CHANGE ORDER: ($28,160.00)
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
ITEM 7-36-INCH STORM DRAIN ENCASEMENT
This Rem is for labor, material, and equipment to provide 16 linear feet of reinforced concrete
encasement around the 36-inch storm drain pipe between STA 11+60 and STA 11+76 where it
crosses beneath the new 108-inch PE pipeline. The work was required since the original contract
drawings indicate only eight inches of vertical separation between the new 108-inch PE RCP and the
new 36-inch storm drain beneath R.This vertical separation is inadequate to utilize only native
material as backfill. In order to protect the 36-inch storm drain pipe located beneath the heavier 108-
inch pipe above it,the lower pipe must be encased in reinforced concrete. The work associated with
this change order Rem was negotiated with the Contractor pursuant to Section 44 C (1) of the
Contract General Requirements(Reference FCO-P266-16 and J.F. Shea's cost proposal dated June
5, 2005).
ADDED COST TO THIS CHANGE ORDER: $13,747.00
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 5 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Three 3
Date: October 5. 2005
Job: Plant No.2 Headworks Replacement, Job No. P2-86
Consultant: Carollo Engineers
ITEM 8—SEAL EMERGENCY SAND BOIL#01
This item is for labor, material,and equipment to respond to an emergency situation. This work was
necessary after a sand boil developed within the floor of the P2-66 excavation on December 29, 2005
in the vicinity of Bore Hole 1 (BH-01), a soil boring drilled in 2001 during project design, allowing water
from the deeper, confined Talbert Aquifer to flow into the bottom of the construction site, stopping
excavation. The work included site preparation and vertical installation of a 65-foot long,48-inch
diameter casing pipe at the sand boil to contain the flowing groundwater, stabilization of the soil near
the sand boil, and drilling/sealing operations using tremmie grout methods to stop the water, seal the
bore hole and immediate existing voids. Approximately 10 cubic feet of grout was used to seal the
hole. The work also included drilling an observation well from ground surface near the sand boil into
the confined Talbert Aquifer to permit monitoring the pressure of the confined aquifer. In addition to
the costs involved with stopping the water,critical path activities including excavation of the project
ske were delayed 32 days. Due to the urgency of the situation, this work was performed on a"time
and material basis"pursuant to Section 44 C (2)of the General Requirements (Reference FCO-P266-
3).
ADDED COST TO THIS CHANGE ORDER: $228,160.00
TIME EXTENSION THIS CHANGE ORDER: 32 Calendar Days
ITEM 9—SEAL EMERGENCY SAND BOIL#02
This item is for labor, material, and equipment to respond to an emergency situation. This work was
necessary after a sand boil developed within the floor of the P2-66 excavation on June 7,2006 in the
vicinity of Bore Hole 2 (131-1-02),a soil boring drilled in 2001 during project design, allowing water from
the deeper, confined Talbert Aquifer to flow into the bottom of the construction site, stopping
excavation. The work included site preparation and vertical installation of a 65-foot long,48-inch
diameter casing pipe at the sand boil to contain the flowing groundwater, stabilization of the soil near
the sand boil,and drilling/sealing operations using tremmie grout methods to stop the water, seal the
bore hole and immediate existing voids. Approximately 10 cubic feet of grout was used to seal the
hole. Unlike the previous occurrence, no time delay was incurred to the project schedule as other
activities on the critical path continued. Due to the urgency of the situation,this work was performed
on a"time and material basis" pursuant to Section 44 C (2) of the General Requirements(Reference
FCO-P266.10)
ADDED COST TO THIS CHANGE ORDER: $219,342.00
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
I
Page 6 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Three 3
Date: October 6 2006
Job: Plant No. 2 Headworks Replacement, Job No. P2-88
Consultant: Carollo Engineers
ITEM 10-PROVISION OF KIRK KEYS
This item is for labor, material, and equipment to provide and install seven Kirk Keys Interlocks
between the Medium Voltage Variable Frequency Drives(VFDs) and respective medium voltage
feeder breakers. The Kirk Keys are a safety device that physically prevents maintenance personnel
from exposure to an electrical danger unless power is disconnected first (the Kirk Keys prevent the
VFD door from being opened if the switchgear feeder circuit breaker is closed). The work was
required since the Kirk Keys were not shown on the original contract drawings and were required to
provide a safe operating system. The work associated with this change order Rem was negotiated
with the Contractor pursuant to Section 44 C (1)of the Contract General Requirements(Reference
FCO-P266-19 and J.F. Shea's cost proposal dated June 26, 2006).
ADDED COST TO THIS CHANGE ORDER: $8,403.00
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
TOTAL ADDED COST TO THIS CHANGE ORDER: $416,788.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 32 Calendar Days
Page 7 of 7
ORANGE COUNTY SANITATION DISTRICT
108"ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction Inc. C.O. No.: Three 3
Date: October 5, 2006
Job: Plant No. 2 Headworks Replacement Job No P2-66
Consultant: Carollo Engineers
The additional work contained within this change order cannot be performed incidental to the prime
work and within the time allotted for the original contract. It is therefore mutually agreed that a 32 day
extension of time to perform the work is required for this change order, and that no direct or indirect,
incidental or consequential costs, expenses, losses, or damages have been or will be incurred by the
Contractor, except as expressly granted and approved by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Date September 15, 2005
Original Contract Time: 1973 Calendar Days
Original Completion Date: February 8,2011
Time Extension this C.O.: 32 Calendar Days
Total Contract Time Extension: 32 calendar Days
Revised Contract Time: 2005 Calendar Days
Revised Final Completion Due Date: March 12, 2011
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: N/A
Original Contract Price $192,296,073.00
Prev.Authorized Changes $ 428A39.00
This Change (ADD) $ 416,788.00
Amended Contract Price $193,141,700.00
i
Page 8 of 8
ORANGE COUNTY SANITATION DISTRICT
108"ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction. Inc. C.O. No.: Three(3)
Date: October 5. 2006
Job: Headworks Improvements at Plant No. 2.Job No. P2-66
Consultant: Carollo Enaineers
Board Authorization Date: October 25, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Pam Koester Date
CIP Project Manager
Approved by:
David A. LudvAn P.E. Date
Director of Engineering
Accepted by:
J.F. SHEA CONSTRUCTION, INC.
Contractor Date
EMS 003815473
1
r
PDC COMMITTEE Meebm,Date To M.ofoir.
10/05/06 10/25/06
AGENDA REPORT Item Number Item Number
PDC06-104 I1(e)
Orange County Sanitation District
Primary Treatment
FROM: David Ludwin, Director of Engineering
Originator: Michael Puccio, CIP Project Manager
SUBJECT: PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES,
JOB NO. P1-37
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 29 to Primary Clarifiers 16-31 and Related Facilities, Job
No. P1-37, with Margate Construction, authorizing an addition of $67,329, increasing
the total contract amount to $72,827,486.
SUMMARY
• Job Number P1-37, Primary Clarifiers 16-31 and Related Facilities, includes the
construction of 16 new primary clarifiers with all support equipment, improvements to
existing Primary Clarifiers 6-15, and improvements to Primary Clarifiers 1-5.
• Brown and Caldwell prepared the plans and specifications and the contract was
awarded to Margate Construction on October 24, 2001.
• This change order includes five items of work and one credit item. There are three
nonreimbursable design errors and one reimbursable design error associated with
this change order. Liquidated damages on this project are $3,000 per day and there
are no bonus provisions. The project is 95% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on October 24, 2001. Please refer
to the attached Change Order Status Report for more information on previous change
orders.
PROJECTICONTRACT COST SUMMARY
Original Contract Price $ 70,366,000
Previously Authorized Changes $ 2,394,157
This Change Order (Add) $ 67,329
Change Orders to Date $ 2,461,486
Percentage Increase to Date 3.50 %
Amended Contract Price $ 72,827,486
1
i\
BUDGETIMPACT
® This item has been budgeted. (Line item: Section 8, CIP, P1-37, Page 52)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date January 7, 2002
Original Contract Completion Date November 7, 2005
Total Number of Change Orders to Date 29
Current Contract Completion Date February 15, 2007
Actual Completion Date N/A
Days Subject to Liquidated Damages 0
Change Order No. 29 Content
Item
No. Description Amount Days Type
Equipment Loop Tag Number ID Staff Requested
1 Plates 1,997 0 Design Change
Human Machine Interface Cabinet Nonreimbursable
2 Shelves 395 0 Design Error
Primary Clarifier 5 Structural Nonreimbursable
3 Concrete Modifications 58,586 0 Design Error
Reducing Grounding Conductor Nonreimbursable
4 Size for MCCs "T" and "U" 6,443 0 Design Error
Reroute Sanitary Drain Line for Reimbursable Design
5 Eastside Control Room Toilet 4,421 0 Error
6 Sump Pump Panel Modifications 8,373 0 Unknown Conditions
Total Change Order $67 329 0
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
This project was included in the Strategic Plan EIR that was certified on October 27,
1999. A Notice of Determination was filed on October 29, 1999.
2
r
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order
MP:el:kf
H:WepBagendalBoard Agenda ReW tet2008 Board Agenda RemMiA l W6gtem i t(e).P1-37.dw
3
BUDGET INFORMATION TABLE
Primary Clarifiers No. 16-31 and Related Facilities
Job No. P1-37
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECT/PHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED AUTHORIZATION TOTAL EXPENDITURE TO EXPENDED
BUDGET BUDGET INCREASE BUDGET TO DATE REQUEST AUTHORIZATION DATE TO DATE(%)
Phase 1-Proect Development $ 175,062 $ 175,062 S 173.000 $ 173.000 S 173.000 lam
Phase 2-Pmlmnary Design $ 317.201 S 317.201 S 317.000 5 317.000 S 317.000 100%
Phase 3-Des' n 5 4,626,092 5 4.626,092 S 4.595,000 S 4.595.000 6 4,626,092 101%
Phase 4-Constmdion S 84,976,205 $ 67.329 $ 85.043,535 S 0,188.174 S 67,329 S 83.255.503 $ 79,089.381 96%
Phase 5-Commissioning $ 330.209 S 330,209 S 396.000 5 396,000 S 117.183 30%
Phase 6-Closeout S 62.541 S 62.541 S 61.000 S 61.000 E 14,978 25%
Phase]-Conlin en S 439.697 $ 67.329) S 372,368 5
PROJEQTTOTAL S - S 90.927008 S - S 90,927.008 S 88730,174 S 67,329 S 88,797.503 S 84.337.634 95%
Reimbursable Costs
PROJECT NET E - $ 90,927.008 1$ - $ 90.927.008 1 5 80,730.174 1 $ 67,329 S 88.797,503 1 S 84,337.634 1 95%
PSA/Contract
Dei n PEA $ 6.787.436 1 S 6,787.436 11 S 6787.436 1 1 5 6.787,436 1 S 6,089.418 9096
Construction Contract $ 72.760.157 S 67.329 S 72.827.486 S 72.760.157 S 67.329 S 72,827,486 $ 68.891.585 95%
EDMS:0OU15296
CHANGE ORDER STATUS REPORT
PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES
JOB NO. P1-37
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZEDTIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE(DAYS)
(DAYS)
CONTRACT 62311999 $ 70,366,000.00 $ 70,366.000.00 O.DO 1400 1400
CO NO.1 1211WMOI $ 0.00 $ 70.358,000.00 0.00 0 1400
CO NO.2 8I12002 $ 75,214.00 $ 70,441.214.00 0.11 49 1449
•'CO NO.3 10212002 $ 48,738.00 $ 70,489,950.00 0.18 0 1449
CO NO.4 12/1812002 $ 356,059.00 $ 70.848,009.00 OAS 82 1531
CO NO.5 2282003 $ 33,527.00 $ 70,879,536.00 0.73 0 1531
CO NO.6 4232D03 $ 54,992.DO $ 70,934,528.00 0.81 21 1552
CO NO.7 8252003 $ 14.750.00 $ 70.949,278.00 0.83 0 1552
CO NO.8 8272003 IS 5,353.00 It 70,954,641.D0 0.84 0 1552
CO NO.9 10222003 IS 187,452.00 $ 71.142.093.00 1.10 0 1552
CO NO. 10 1I1IWD03 $ 56,041.00 $ 71,198,134.OD 1.18 0 1552
CO NO. 11 12/42003 $ 20,680.00 $ 71,218.814.00 1.21 0 1552
CO NO. 12 22520D4 $ 22,390.00 $ 71,241.204.00 1.24 0 1562
CO NO. 13 3242004 $ 784.00 $ 71,241,988.00 1.24 0 1552
CO NO. 14 5282004 $ 67,455.00 $ 71.309,443.00 1.34 0 1552
CO NO. 15 10272004 $ 67,937.00 $ 71,377,380.00 1.44 143 1695
CO NO. 16 121152004 $ 160,121.00) $ 71217.259.00 121 0 1695
CO NO.17 2232005 $ 127,478.00 $ 71,344,737.D0 1.39 0 1695
CO NO. 18 3232005 $ 61.690.00 $ 71.406,427.00 1.48 0 1695
CO NO.19 4272005 $ 116 710.00 71 523137.00 1.64 0 1695
CO NO.20 5/252005 84 955.00 71 608 092.00 1.T7 28 1723
CO NO.21 7202005 100 648.00 $ 71 708 740.0D 1.90 0 1723
CO NO.22 9262005 $ 48 078.00 $ 71 758 818.00 1.97 0 1723
CO NO.23 102612005 $ 117648.00 $ 71874,488.00 2.14 0 1723
CO NO.24 12212005 $ 97 562.00 $ 71 972 028.00 2.28 0 1723
CO NO.25 2=006 $ 118 822.DO $ 72 088 850.00 2.44 0 1723
CO NO.ZB 5242008 1 $ 272 749.00 $ 72 361 599.00 2.84 142 IL
CO NO.27 6282006 1 314 921.00 $ 72 676 520.00 3.28 0 1865
CO NO.28 9272006 $ 83,637.00 $ 72,760,157.00 3.40 0 1885
8+A6ro,'
•• Approved by PDC Committee per delegated authority by Board Resolution 99-23
Approved by General Manager per delegated authority by Beard Resolution 99-23 EDMS' 003815293
f
CHANGE ORDER PERFORMANCE REPORT
PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES
JOB NO.P147,CHANGE ORDER NO.29
Contractor:MARGATE CONSTRUCTION Project Type:PLANT EXPANSION
Design Consultant:BROWN S CALDWELL Contract%Complete: 96.13% Original Contract Price: $70,355,000
CHANGE ORDER TYPES TRACKED INFORMATION ONLY
Unshaven Condition Stan Requested Reimbursable Design Non-Relmbumble Subtotal CO Tylroa
Change Errors Design Emom Tracked' Other Totel
Change Orders to $738,165 1.06% $11,695 0.02% $189,499 0.27% $1,540,481 2.19% $2,437,411 3.52%
Date ($85,691) -0.12X $2,351,720 3.40%
Change Orden $6,373 0.01% $1,997 0.00% $4,421 0.01% $52,538 0.07% $67,329 0.10% $0 0.00% $67,329 0.10%
i P
Change Order Total $746,538 1.06% $13.692 0.02% $193'920 0.28% $1.593.027 2.26% $2,547,177 3.82% ($85,fi91) -0.12% $2,461,486 3.50%
'The Change Order Management Plan tracks the premding four change order ypee
EOMS:003815392
v
Page 1 of 5
ORANGE COUNTY SANITATION DISTRICT
108"ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction, Inc. C.O. No.: Twenty Nine(29)
Date: October 25, 2006
Job: Primary Clarifiers 16-31 and Related Facilities, Job No. P7-37
Consultant: Brown and Caldwell
Amount of this Change Order(Add)(Deduct) $67,329.00
In accordance with contract provisions,the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 —EQUIPMENT LOOP TAG NUMBER ID PLATES
This item compensates the Contractor for providing additional equipment loop tag number ID plates.
This applies to equipment whose loop tag numbers were changed by OCSD after specified ID plates
were fabricated per contract. This change was done to accommodate new equipment tagging
standards that were not known in design. The work was accomplished on Contractor's force account
pursuant to Section 48(B) 2 of the General Requirements(Reference FCO-P137-74).
ADDED COST THIS CHANGE ORDER ITEM: $1,997.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2—HUMAN MACHINE INTERFACE CABINET SHELVES
This item provides for the purchase and installation of three new shelves for the Human Machine
Interface(HMI)cabinets to be installed under the P1-37 contract. The contract drawings did not
provide for a shelf for the Virtual Address Extension (VAX)work station to sit on in the HMI cabinets.
The drawings showed the VAX work stations mounted vertically to the interior wall of the cabinet.
Vertical mounting could result in failure of the work stations internal hardware. This shelf allows the
VAX work station to sit flat up off of the floor of the cabinet. The work was accomplished on
Contractor's force account pursuant to Section 48 (B) 2 of the General Requirements (Reference
FCO-P137-252).
ADDED COST THIS CHANGE ORDER ITEM: $395.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Y
Page 2 of 5
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE,P.O. BOX 8127
FOUNTAIN VALLEY,CALIFORNIA 92728.8127
CHANGE ORDER
Contractor: Margate Construction, Inc. C.O. No.: Twenty Nine(29)
Date: October 25, 2006
Job: Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37
Consultant: Brown and Caldwell
ITEM 3—PRIMARY CLARIFIER 5 STRUCTURAL CONCRETE MODIFICATIONS
This item provides for structural modifications to the concrete wall of Primary Clarifier 5 in the areas
where the new aluminum flat cover trusses will be bearing on the tank wall. During the submittal
process for the covers, it was determined by the Sanitation District's design consultant, Brown and
Caldwell,that the upper portions of the existing clarifier walls are inadequate to withstand the lateral
forces off the cover. This change provides for construction of 16 new concrete pilasters cast integrally
with the existing clarifier wall at the location where each cover support truss intersects the clarifier
wall. This change will adequately transfer the new cover loads to the clarifier structure. Similar
structural modifications for Clarifiers No. 3 8 No. 4 are required and will be included in future change
orders.
The work was accomplished on Contractor's force account pursuant to Section 48 (B) 2 of the
General Requirements(Reference FCO-P137-326).
ADDED COST THIS CHANGE ORDER ITEM: $58,586.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4—REDUCING GROUNDING CONDUCTOR SIZE FOR MCC'17 AND"U"
This hem provides for a credit to OCSD for reducing the size of four equipment grounding conductors.
It was determined by the Sanitation District's design consultant, Brown and Caldwell,that the
grounding cables for the feeders supplying power to MCC's'T"and'U"were specified larger than
needed for the design requirements or required by the National Electric Code(NEC). This change will
modify the design documents and provide a credit for installation of a smaller cable size. The work
associated with this Change Order was negotiated with the Contractor pursuant to Section 48 (B) 1 of
the General Requirements (Reference FCO-P137-344).
CREDIT THIS CHANGE ORDER ITEM: ($6,443.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
V
Page 3 of 5
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction, Inc. C.O. No.: Twenty Nine(29)
Date: October 25, 2006
Job: Primary Clarifiers 16-31 and Related Facilities,Job No. P1-37
Consultant: Brown and Caldwell
ITEM 5—REROUTE SANITARY DRAIN LINE FOR EASTSIDE CONTROL ROOM TOILET
This item provides for modifications to the sanitary drain line servicing the eastside control room
restroom. The sanitary drain line from the eastside control room restroom currently discharges waste
to the existing scum pit in the eastside scum gallery. Although the drain discharges above the liquid
level, as scum collects in the pit the scum layer rises above the liquid level and plugs the drain. This
change will re-route the sanitary drain piping to discharge into the scum decant line down stream of
the scum pit and resolve the problem with the sewer drain backing up. The work associated with this
Change Order was negotiated with the Contractor pursuant to Section 48 (B) 1 of the General
Requirements(Reference FCO-P137-345).
ADDED COST THIS CHANGE ORDER ITEM: $4,421.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 6—SUMP PUMP PANEL MODIFICATIONS
This item provides for minor changes in the existing sump pump panels and documentation updates.
A field investigation of the current as-built conditions of the existing sump pump panels revealed the
existing internal panel wiring required modifications to interface with the starters in the MCC. The
work associated with this Change Order was negotiated with the Contractor pursuant to Section 48
(B) 1 of the General Requirements(Reference FCO-P137-347).
ADDED COST THIS CHANGE ORDER ITEM: $8,373.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL ADDED COST THIS CHANGE ORDER: $67,329.00
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
The additional work contained in this Change Order can be performed incidental to the prime work and
within the time allotted for the original Contract and any extensions to the Contract time made by this and
all previously issued Change Orders. The Sanitation District and Contractor agree that the added cost
described above constitutes full and equitable consideration for all the Impacts incurred by the Contractor,
and no other direct or indirect, incidental or consequential costs, expenses, losses or damages have
been or will be incurred by Contractor,except as expressly granted and approved by this Change Order.
d
Page 4 of 5
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction. Inc. C.O. No.: Twenty Nine(29)
Date: October 25 2006
Job: Primary Clarifiers 16-31 and Related Facilities.Job No. P1-37
Consultant: Brown and Caldwell
SUMMARY OF CONTRACT TIME
Original Contract Date: January 7,2002
Original Contract Time: 1,400 Days
Original Completion Date: November 7,2005
Time Extension this C.O: 0 Days
Total Contract Time Extension: 465 Days
Revised Contract Time: 1,865 Days
Revised Final Completion Due Date: February 15, 2007
Time Subject to Liquidated Damages: WA
Actual Final Completion Date: NIA
Original Contract Price $ 70,366,000.00
Prev.Authorized $ 2,394,157.00
This Change(Add) $ 67,329.00
Amended Contract Price $ 72,827,486.00
r
Page 5 of 5
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Maroate Construction, Inc. C.O. No.: Twenty Nine(29)
Date: October 25, 2006
Job: Primary Clarifiers 16-31 and Related Facilities, Job No. Pt-37
Consultant: Brown and Caldwell
Board Authorization Date: October 25, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Michael Puccio, P.E. Date
CIP Project Manager
Approved by:
David A. Ludwin, P.E. Date
Director of Engineering
Accepted by:
MARGATE CONSTRUCTION
Contractor Date
MP:eI
EDM5:DMlU95
PDC COMMITTEE MmUng Date To 6d.0r Dlr.
10/05/06 10/25/06
AGENDA REPORT Item Number Item Number
PDC06-105 11
Orange County Sanitation District
MisC.&
1W Suppart Projects
FROM: David Ludwin, Director of Engineering
Originator: Christopher MacLeod, CIP Project Manager
SUBJECT: LABORATORY REHABILITATION, JOB NO. J-88
GENERAL MANAGER'S RECOMMENDATION
(1) Ratify Change Order No. 1 to Laboratory Rehabilitation, Job No. J-88, with Dalke &
Sons Construction, Inc., authorizing an addition of$28,657 and 214 calendar days,
increasing the total contract amount to $671,937; and (2) Accept Laboratory
Rehabilitation, Job No. J-88, as complete, authorizing execution of the Notice of
Completion and approving the Final Closeout Agreement with Dalke & Sons
Construction, Inc.
SUMMARY
• This project reduces potential staff exposure to corrosive chemicals and improves
the work environment for the laboratory staff. The work consists of replacement and
installation of new fume hoods, casework replacement, floor and ceiling tile
renovation, and renovation of the existing ventilation exhaust system.
• The plans and specifications were prepared by Tetra Design, Inc. and the contract
was awarded to Dalke & Sons Construction, Inc., on July 20, 2005.
• Change Order No. 1 includes three items of added work to Job No. J-88 and a
214-day time extension. There are three non-reimbursable design errors and no
reimbursable design errors associated with Change Order No. 1. Liquidated
damages on this contract are $200 per day and there are no bonus provisions.
The contract is now 100% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The construction contract was awarded by the Board of Directors on July 20, 2005 for
the sum of$643,280. Please refer to the attached Change Order Status Report for
information on all previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 643,280
Previously Authorized Changes $ 0
This Change Order (Add) $ 28,657
Change Orders to Date $ 28,657
Percentage Increase to Date 4.45%
Final Contract Price $ 671,937
BUDGETIMPACT
® This item has been budgeted. (Line item: FY2004-05, Section 8, page 57)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date September 12, 2005
Original Contract Completion Date January 9, 2006
Total Number of Change Orders to Date 1
Final Completion Date August 11, 2006
Days Subject to Liquidated Damages N/A
Change Order No. 1 Content
Item Description Amount Days Type
No.
1 Relocate Fume Hood Utilities 869 0 Non-reimbursable
Design Error
2 Fireproof Structural Steel 6,810 0 Non-reimbursable
Design Error
3 Ductwork and Blast Gates 20,978 214 Non-reimbursable
Design Error
Total —Change Order No. 1 $28,667 214
ALTERNATIVES
None
CEQA FINDINGS
This project is categorically exempt from CEQA requirements
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order
CML:jf:eh
HidepAagenda\Board Agenda Reports@006 Board Agenda Repods\1006V1ern 11 d).JA8.doc
BUDGET INFORMATION TABLE
LABORATORY REHABILITATION
JOB NO. J-88
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
DECREASE
Phase i-Proect Development S 29.930 5 29930 S - $ 29.930 S 29.930 $ - S 29,930 $ 30,022 100%
Phase 2-Pmliminary Design S 81.000 S 81000 S - S 81,000 S 81.000 S - 5 81000 S wS17 75%
Phase 3-Des" n $ 379.940 S 379.940 S - $ 379.940 S 379,940 S - S 379.940 S 215.661 57%
Phase 4-Construction $ 1,085,960 S 1,065.960 S - S 1.085.960 S 1.065,960 $ - S 1.085,960 S 930.288 86%
Phase 5-Commiumning $ 105,990 5 105.990 S - 5 105.990 S 105,990 $ - S 105.990 $ 1.588 1%
Phase 6-Close-0ut S 26A30 S 26,430 S - S 26,430 $ 26.430 S - S 26,430 S 2.368 9%
Phase 7-Conti e S 120,000 S 120,000 S - S 120.000
PROJECTTOTAL S 1,829.250 S 1,829.250 $ - $ 1,829,250 S 1,709.250 S - S 1.709,250 S 1,240,744 73%
Reimbursable Costs
PROJECT NET S 1.829.250 1 $ 1.829,250 1 f - S 1,829250 1 1 S 1709.250 1 $ - S 1.709.250 S 1.240,744 73%
PSAJContract
Design PEA S 65,655 S 65,655 $ 18305 $ 83,960 S 65.655 S 18.305 S 83,960 S 83840 t00%
Consnction Contract $ 641,000 1 S 643.280 1$ 28,657 S 671.937 11 S 543,280 f 28,657 1 S 671.937 1 S 643280 1 96%
EDMS:3016861
CHANGE ORDER STATUS REPORT
LABORATORY REHABILITATION
JOB NO. J-88
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE OR TIME TO DATE
DECREASE (DAYS) (DAYS)
CONTRACT 7/2 012 0 0 5 $643,280 $690,159 0.00% 120 120
CO NO. 1 Pending $28.657 $671,937 4.45% 214 334
EDMS:3814970
CHANGE ORDER PERFORMANCE REPORT
LABORATORY REHABILITATION
JOB NO.J-88,CHANGE ORDER NO t
Contractor.DALKE&SONS CONSTRUCTION,INC. Project Type:REHABILITATION
Design Consultant:TETRA DESIGN,INC. Contract%Complete:100% Original Contract Price: $843.260
CHANGE ORDER TYPES TRACKED INFORMATION ONLY
Unknown Cenditlon Stan Requested Change Reimbursable Design Non•Relnburaabls Subtatal CO Types Other Total
Design Errors Tmckad
Change Orders $0 0,00% $0 0.00% 4$ 0.0000%%
.00% $28,657 4,45% $28,667 4.45% $0 0.0D% $28.657 4.45%
this Period
Change Orders to $p 0.00% $0 0.00% . $0 0.00% $0 0.00% $0 0.00% $0 0.00%
Date
Change Order Total $0 0.00% $0 0.DOM $28,657 4.45% $28.657 4.45% $0 0.00% $28,667 4.45%
'The Change Order Manapemant Ran hacks the prscetling bur chenpe order IYDee
EDMS:00381BO37
t
Page 1 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Dalke& Sons Construction, Inc. C.O. No.: One (1)
Date: October 25, 2006
Job: Laboratory Rehabilitation, Job No. J-88
Consultant: Tetra Design Inc
Amount of this Change Order(Add)(DedusE) $ 28,657.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation,the following additions to or deductions
from the contract price are hereby approved.
ITEM 1: RELOCATE FUME HOOD UTILITIES
This Item is to relocate water line connections for the new fume hood cabinets in the Central
Laboratory room nos.231 and 234. The existing hot, cold and deionized water line connections were
in conflict with installation of the new fume hoods and sink cabinets and it was necessary to relocate
the utility connections in order to line up with the back of the new fume hood cabinets. The location of
the existing water line connections was not shown on the contract drawings. This additional work was
not included in the contract and was accomplished on a time and materials basis with the Contractor
pursuant to Section 44 C. 2)of the General Requirements, Division 01. (Reference FCO No. 1)
ADDED COST THIS CHANGE ORDER ITEM: $869.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2: FIREPROOF STRUCTURAL STEEL
This Item is to fireproof all new added structural steel members on the underside of the roof deck in
the Central Laboratory at Plant 1. The work included fireproofing 26 each 4"diameter x 2'long steel
pipe post supports and 2 each 16"x4' steel beams using Moncoat MK6 fireproof coating. Fireproofing
of exposed steel framing on the underside of the roof is required by the Uniform Building Code and
was not included in the contract. This additional work was not included in the contract and was
negotiated with the Contractor pursuant to Section 44 C. 1)of the General Requirements,Division 01.
(Reference FCO No. 2)
CREDIT THIS CHANGE ORDER ITEM: $6,810.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar
Days
Page 2 of 4
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor: Dalke& Sons Construction, Inc. C.O. No.: One (1)
Date: October 25 2006
Job: Laboratory Rehabilitation, Job No. J-88
Consultant: Tetra Design, Inc.
ITEM 3: VENTILATION DUCT AND BLAST GATE ADDITION
This Rem furnishes and installs new stainless steel ductwork, hoods and blast gates
in the Central Laboratory room nos. 231 and 234 as follows:
1. Furnish and install 9 each 6-in. diameter blast gates in room 231
2. Furnish and install 10 linear feet of 6-in duct in room 231
3. Furnish and install 2 each equipment hoods in room 231
4. Furnish and install 4-in. diameter"Y"splitter and 2 each 4-in. diameter blast gates in room 234
5. Furnish and install 2 each 6-in. x 104 diameter duct drops in room 231
Additional blast gates were added to provide more precise control of ventilation of laboratory
equipment. Two stainless steel hoods were added to capture fumes above two portable countertop
microwave ovens. Additional ductwork was added to provide ventilation connections for newly
purchased laboratory equipment. The new blast gates, ductwork and hoods were not included in the
contract and additional time was required to design, provide shop drawings,fabricate and install the
new ventilation ductwork, hoods and blast gates. This additional work was not included in the
contract and was negotiated with the Contractor pursuant to Section 44 C. 1) of the General
Requirements, Division 01. (Reference FCO No. 3)
ADDED COST THIS CHANGE ORDER ITEM: $20,978.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 214 Calendar Days
,
Page 3 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Dalke& Sons Construction, Inc. C.O. No.: One(1)
Date: October 25, 2006
Job: Laboratory Rehabilitation, Job No. J-88
Consultant: Tetra Desion. Inc.
TOTAL ADDED COSTS THIS CHANGE ORDER: $28,657.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 214 Calendar Days
The additional work contained within this change order can be performed incidental to the prime work
and within the time allotted for the original contract and any extensions to the contract time made by
this change order. It is therefore mutually agreed that a time extension of 214 calendar days is
required for this change order, and that no direct or indirect, incidental or consequential costs,
expenses, losses, or damages have been or will be incurred by Contractor,except as expressly
granted and approved by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Date: September 12,2005
Original Contract Time: 120 Calendar Days
Original Completion Date: January 9, 2006
Time Extension this C.O.: 214 Calendar Days
Total Contract Time Extension: 214 Calendar Days
Final Completion Date: August 11, 2006
Time Subject to Liquidated Damages: Not Applicable
Original Contract Price $ 643,280.W
Prev. Authorized Changes $ 0.00
This Change (Add) (PedusE) $ 28,657.00
Amended Contract Price $ 671,937.00
v
Page 4 of 4
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor: Dalke & Sons Construction, Inc. C.O. No.: One (1)
Date: October 25 2006
Job: Laboratory Rehabilitation, Job No. J-88
Consultant: Tetra Design Inc.
Board Authorization Date: October 25, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Construction Manager Date
Approved by:
Director of Engineering Date
Accepted by:
DALKE & SONS, CONSTRUCTION, INC.
Contractor Date
EDMSMM14B 7
PDC COMMITTEE MeeOog Date To ed.ofM.
10MIX3 1025106
AGENDA REPORT item N.bw It.N=ber
P13006105 11(g)
Orange County Sanitation District
colleotl•os
Fadlltlee
FROM: David A. Ludwin, Director of Engineering
Originator: Hardat Khublall, CIP Project Manager
SUBJECT: GISLER-REDHILL TRUNK IMPROVEMENTS, REACH "A", CONTRACT
NO. 7-36; ORANGE TRUNK IMPROVEMENTS, CONTRACT NO. 7-39;
GISLER-REDHILL/NORTH TRUNK IMPROVEMENTS, CONTRACT
NO. 7-41; AND CITY OF TUSTIN PROJECT NOS. 6106 AND 6151
GENERAL MANAGER'S RECOMMENDATION
(1)Ratify Change Order No. 12 to Gisler-Redhill Trunk Improvements, Reach "A",
Contract No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-Redhill North
Trunk Improvements, Contract No. 7-41; and City of Tustin Project Nos. 6106 and 6151,
with ARB, Inc., authorizing a deduction of$39,575, reducing the total contract amount to
$21,963,535; (2) Ratify a Unilateral Change Order No. 13, authorizing an addition of
$439,935, increasing the total contract amount to$22,403,470; and (3) Accept Gisler-
Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill North Trunk Improvements, Contract
No. 7-41; and City of Tustin Project Nos. 6106 and 6151, as complete, authorizing
execution of the Notice of Completion.
SUMMARY
• Contract No. 7-41 located in the City of Tustin, City of Orange, and unincorporated
areas of the County of Orange, consists of improvements to relieve hydraulic
deficiencies on the Gisler-Redhill North Trunk Sewer along Newport Avenue,
El Camino Real, and Prospect Avenue. Contract No. 7-39 is located in the City of
Tustin and in the unincorporated areas of the County of Orange, and consists of
improvements to relieve hydraulic deficiencies on the Orange Trunk Sewer along
Holt Avenue, 1 r Street, and Hewes Avenue. Contract No. 7-36, located in the City
of Tustin, consists of improvements to relieve hydraulic deficiencies on the
Gisler-Redhill Trunk Sewer Improvements along Redhill Avenue from Mitchell
Avenue to La Colina Drive. The 1999 Strategic Plan identified these reaches of
sewers as hydraulically deficient and in need of replacement.
• AKM Consulting Engineers prepared the plans and specifications and the
construction contract was awarded to ARE, Inc. on January 28, 2004.
Page 1
• Change Order No. 12 includes five items of added work to Contract No. 7-36 and
Contract No. 7-41. There are no reimbursable or nonreimbursable design errors
associated with this change order. Change Order No. 13 includes seven items of
added work to Contract No. 7-36, Contract No. 7-39, and Contract No. 741. There
are no reimbursable or nonreimbursable design errors associated with this change
order. The contract includes liquidated damages of$1,000 per day and no bonus
provisions. The contract is now 100% complete.
• Staff recommends that the Board accepts this project as complete and requests
authorization to execute and file the Notice of Completion. The Final Closeout
Agreement will not be prepared at this time due to the pending Request for Equitable
Adjustment (REA) submitted by the Contractor (ARB, Inc).
PRIOR COMMITTEE/BOARD ACTIONS
The construction contract was awarded by the Board on January 28, 2004 for a lump
sum amount of$18.375,999. Please see attached Change Order Status Report for
information on all previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 18,375,999
Previously Authorized Change Order $ 3,627,111
Change Order No. 12 (Deduct) $ (39,575)
Unilateral Change Order No. 13 (Add) $ 439,935
Change Orders to Date $ 4,027,471
Percent Increase to Date 21.92%
Amended Contract Price $ 22,403,470
BUDGETIMPACT
® This item has been budgeted. (Line item:contact No.7-36 FY o5106.seclloh a.page 3a,and con rae
No.741 FY 05M.Section 8.page 38. These pmjetls are not referenced in the F 061)7 Budget book because they
xere initially scheduled to be completed pnor to the beginning of FY(MT)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
The table below shows all reimbursable costs for these projects:
Contract Description Amount Amount
No. Requested Received
6106 & City of Tustin, Waterline Projects $665,211 $665,211
6151
7-41 `Level3 Communications, Fiber Optic Cable $231,428 $65,932
Interference
7-41 AKM Consulting Engineers, 10-inch EOCWD $84 064 $0
Waterline, Reimbursable Design Error.
TOTAL $980,703 $731,143
Level 3 Communications is disputing $165,496.
Page 2
v v ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date April 5, 2004
Original Contract Completion Date November 25, 2005
Total Number of Change Orders to Date 13
Current Contract Completion Date March 31, 2006
Days Subject to Liquidated Damages TBD
Liquidated Damages Assessment TBD
Change Order No. 12 Content
Item No. Description Amount Days Type
Contract
No. 736
1 Sinkhole Repairs at Sta. 30+00. $62,955 0 Unknown
Conditions
2 Sinkhole Repairs at Sta. 37+00. $138,718 0 Unknown
Conditions
Contract
No. 7-41
Curb, Gutter and Storm Drain Unknown
3 Catch Basin Replacement, Sta. $11,872 0 Conditions
114+50.
4 Curb and Gutter Replacement, $3,892 0 Other
City of Orange, Sta. 181+00.
Contract
Nos.7-36,
736,7.41&
6106 6151
Adjustmerd of Engineer's
Quantities:
Contract 736: ($ 49,871)
5 Contract 7-39: ($110,897) 0 Other
Contract 7-41: 96 244
TOTAL: ($257,012)
Total—Change Order No. 12 $39,675 0
Item No. 1 is for the repair of a sinkhole that was found several weeks after sewer
installation and final asphalt cap were completed. The sinkhole was developed due to
leakage of a 6-inch asbestos cement (ACP) waterline. The waterline was installed by
the City of Tustin approximately 50 years ago and was found to be badly deteriorated
and appeared to be very fragile. Contract documents required the Contractor to protect
in place the waterline. Staff believes that during sewer installation the waterline was
carefully protected by the Contractor, but because of its poor condition, the line may
have developed minor leaks several weeks after asphalt paving was completed. The
additional work was completed on June 26, 2006. Item No. 4 on previously approved
Change Order No. 11 covered costs up to May 31, 2006.
Page 3
a
D
Item No. 2 is for the repair of a sinkhole that was found several weeks after sewer w
installation and base paving were completed. The sinkhole was developed due to
leakage of a 6-inch asbestos cement (ACP) waterline. The waterline was installed by
the City of Tustin approximately 50 years ago and was found to be badly deteriorated
and appeared to be very fragile. Contract documents required the Contractor to protect
in place the waterline. Staff believes that during sewer installation the waterline was
carefully protected by the Contractor, but because of its poor condition, the line may
have developed minor leaks several weeks after asphalt paving was completed.
Unilateral Change Order No. 13 Content
Rom No. Description Amount Days Type
Contract
No. 736
City of Tustin Traffic Control
1 Modifications and Alignment $230 215 0 Other
Changes at Mitchell, Nisson and
El Camino Real Intersections.
City of Tustin Traffic Control
2 Modifications and Utility $68 219 0 Other
Conflicts at Bryan Ave
Intersection.
3 Additional Final Asphalt Cap $37 275 0 Other
along Red Hill Avenue.
4 Adjustment of Engineer's $22115 0 Unknown
Quantities, Bid Item No. 17. Conditions
Contract
No. 7-41
5 Additional House Connections $93,764 0 Unknown
Conditions
6 Additional Final Asphalt Cap $9,556 0 Unknown
alongPros Avenue. Conditions
Additional Paving and Credit for Unknown
7 Base Material, Station 127+00 ($41,209) 0 Conditions
to 166+00
Total—Change Order No. 13 1 $439,935 0
Item No. 1 is for additional costs due to traffic control modifications requested by the
City of Tustin (City) at Mitchell, Nisson, and El Camino Real intersections along Red Hill
Avenue, from sewer station 9+92 to 20+46, at sewer station 27+00, and for additional
costs due to alignment changes at Mitchell and Nisson intersections. Prior to the
implementation of the traffic control drawings included under the contract documents,
the City requested traffic control modifications, which included the installation of
temporary striping, reconfiguration of traffic closures from single phase to multiple
phases, additional traffic control devices, modification of permitted working hours from
weekdays to weekends, and installation of changeable message boards. The traffic
Page 4
V
control drawings included under the contract documents had been reviewed and
approved by the City prior to construction. The alignment changes at Mitchell and
Nisson intersections were needed due to the interference of two undisclosed 8-inch
asbestos cement waterline thrust blocks. The waterlines were shown in contract
drawings but the water valves and thrust blocks were not shown on contract drawings.
Item No. 2 is for extra costs associated with traffic control and working hour
modifications requested by the City of Tustin (City) at Bryan Avenue and Red Hill
Avenue intersection, and for additional cost due to a conflict with an existing 63-inch
storm drain, an existing 48-inch manhole, and an existing 12-inch sewer lateral. Prior to
the implementation of the traffic control drawings included under the contract
documents, the City requested traffic control modifications, which include additional
traffic control devices, reconfiguration of traffic closures from single phase to multiple
phases, modification of permitted working hours on weekdays and from weekdays to
weekends. The traffic control drawings included under the contract documents had
been reviewed and approved by the City prior to construction.
Item No. 5 is to compensate the Contractor for the additional house connections
installed beyond Contract Bid item No. 54 and previously approved by the Board under
Item 1 of Change Order No. 1. Eleven additional house connections were added
beyond the 139 previously approved. The additional house connections were not
identified on the original contract drawings and were needed during construction. Also,
after the construction contract was awarded, the design was changed at the request of
the City of Tustin to include additional properties with septic systems for future
connection to the Sanitation District's trunk sewer.
The Contractor (ARB, Inc.) submitted a Request for Equitable Adjustment (REA) on
July 13, 2006, for an amount of$11,042,573 to the Sanitation District. Included in the
REA is compensation for pending Change Orders, starting from Change Order No.10
for a total of$1,689,252. Change Order No. 10 previously approved by the Board on
August 23, 2006, Change Order No.11 previously approved by the Board on
September 27, 2006, along with this pending Change Order No. 12 and Change Order
No. 13, if approved, would reduce the Contractor's REA by$1,125,531.
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program Environmental Impact
Report certified on October 27, 1999. A Notice of Determination was filed on
October 29, 1999.
Page 5
• 9
ATTACHMENTS
1. Budget Information Tables— Contract No. 7-36, 7-39 and 7-41
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order No. 12
5. Unilateral Change Order No. 13
RC:bm:gc
KIdephagenda\Board Agenda Repads MW Board Agenda Repods(iggBU(em 11(g).7-W.dm
Page 6
BUDGET INFORMATION TABLE
GISLER-REDHILL TRUNK IMPROVEMENTS, REACH "A"
CONTRACT NO. 7-36, CO #12 & CO #13
ORIGINAL CURRENT PROPOSED BUDGET PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED PROJECT REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE/DECREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
Phase 1-Pro cl De Io menl s 45,000 $ 29.810 5 29,810 5 29.810 $ 29.810 S 29,810 100%
Plase2-Pre9mina Des n $ 1.504 S 1.504 S 1,504 S 1,504 $ 1.504 100%
Phase3-Design S 369.000 S 591.679 5 581.679 5 581.679 S MISTS S MISTS 100%
Phase 4-Constwdmn IS 6.386.000 S 7.486.756 $ 7.485756 S 6,687.432 S 529.626 S 7.117.058 S 5.760.326 am
Phaw 5-Commissmmg S 94.272 S %272 S 94,272 S 9L272 $ 16.417 17%
Phase 6-Cbse-0ut $ 23.050 $ 23.050 S 23.050 $ 23.0H S 442 2%
Phase]-Conlin e 5 1,032A00 5 140,362 S 140.362
PROJECTTOTAL 5 7,833.000 $ 8.357.433 S - $ 8.357.433 $ 7.317.747 $ 529.626 $ 7,847,373 S 6.390.178 81%
Reimbursable Cosls
PROJECT NET I S 7,832,000 I S 3.357,433 S - S 8.357,433 S 7.317,747 1 $ 529,628 S 7.847,373 S 6,390.178 81%
PSA/Conbact
Des" n PSA $ 223.176 S 331.522 5 331.522 11 S 331,523 1 S 331,522 $ 320.485 97%
Cmubuction Contract S 42M."Z I S 5,157.89,1 1 S 529.626 I 5 5.687,520 1 S 5.157,894 1 5 529,628 1 S 5.687,520 I S 5.157.893 91%
EDMS.00301A00
BUDGET INFORMATION TABLE
ORANGE TRUNK IMPROVEMENTS
CONTRACT NO. 7-39, CO #12 & CO #13
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECT/PHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDEDTO
BUDGET BUDGET INCREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
DECREASE
Phase 1 -Pmecl Dev O menl S 46,000 S 46,564 S 46.564 $ 46.564 $ 46.564 $ 46564 100%
Phase2-Preliminary Des o $ 1,DDO S 1.391 S 1.391 S 1,391 S 1,391 $ 1391 100%
Phase 3-Design S 398,000 S 411,471 5 411.471 $ 411,471 1 S 411.471 S 411,471 100%
Phase 4-Constmaion S 4,250DOO $ 4.7"AN S 4.764.634 S 4.764.634 5 110,897 $ 4.653.737 S 4.653,600 100%
Phase 5-Commissioning S 61,000 S 61.735 $ 61,735 $ 61,735 S 61.735 S 37.735 61%
Ph m6-Cbse-0ut $ 17.000 S 12.134 S 12,134 S 12,134 S 12,134 S 3.505 29%
Phase 7-Conlin en $ 527,000 S $ - S
PROJECTTOTAL $ 5,298,000 $ 5.297.929 S - S 5,297,929 S 5,297,929 S 1110.897) $ 5.187,032 S 5.154.266 99%
Reimbursable Cosls
PROJECT NET S 5,298.000 1 S 5.297,929 $ - S 5.297.929 1 1 $ 5.297.929 S (110.897) 5 5.187.032 1 S 5.154.266 99%
PSA/Contnct
Desi n PSA S 224,098 $ 235.238 1 S 235.239 11 S 235.238 S 235.238 1 S 235.238 1 100%
Constmdion Contract S 4,113.733 S 4,268,351 1$ (110.897) S 4.157457 5 4.268.351 5 (110,897) $ 4,157,457 1 $ 4,030,540 1 97%
EDMS:003815481
.r
BUDGET INFORMATION TABLE
GISLER-REDHILLINORTH TRUNK IMPROVEMENTS
CONTRACT NO. 741, CO#12& CO#13
A
- - - �20
fi ORMINAL CURRENT 2 sr -
p b rURDS"
IAut"0R&0, PRWftuT ' AUTHoRlzl
, A 0 d
dUbG& BUDdET- Nk dE SWEET DATEA'"` A6�i T A
Phase I-Pro Development It 40.000 $ 41.000 $ 41.000 $ 41,000 $ 41.000 $ 39,736 97%
Phan 2-Prelimmag Oa S 1,000 $ 18.0m s 18,000 s 18.000 $ 18,000 It 15.429 86%
Ph..3-Deal n It 628.000 S 680J000 $ 680.000 S 880.000 s 680.000 1 s 644.071 0%
Phan 4 w Constrwilon S 13.129.000 $ 14.750.450 s 14,750,450 S 14.750,450 $ 18d89) $ 14,732,081 S 14.101,303 96%
Phase 5-Commesionfing s MAW $ 216,000 $ 218.000 $ 216,000
s 216,000 $ 22105 10%
pl,mm 6-cbse-Oul $ 45.000 S 46.000 $ 46.000 $ 46.000 $ 46,000 $ 3.305 7%
Phase 7-Conlin e $ 1,334.000 S "0550 $ 440.550 $
PROJECT TOTAL 3 15.359,000 It 15.192.000 $ $ 16.192,000 It 15.75IA50 3 (18.369) $ 15.733,081 $ 14,825,949 W%
lReimbursable Costs $ 731,143 1 $ 731,143 j It 731.1431 1 3 731,143 1
1PROJECT NET $ 15.359.000 $ 15.460,857 S $ 15,460.857 E 15,020,307 S (18,369)1 $ 15,001,938 1 S 14.825.1)49 N%
PSA/Contmct
iDeslan PSA i$ 368M4 3 420.641 s 420,6,11 1��j $ 420.641 $ 420.841 415A30 99%
iconstwellm,Conned $ 10.016,823 $ 12,576.862 $ (18,369)1 It 12.558.493 IJ 1 It 12.576.862 1 s (18,369)1 $ 12,558.4031 3 12.429.693 1 99%
EDMS:003815483
CHANGE ORDER STATUS REPORT
GISLER-REDHILL TRUNK SEWER IMPROVEMENTS, ORANGE TRUNK SEWER IMPROVEMENTS, AND GISLER
REDHILL NORTH TRUNK SEWER
CONTRACT NOS. 7-36, 7-39, AND 7-41
AND CITY OF TUSTIN PROJECT NUMBERS 6106 AND 6151 -CO#12 & CO#13
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZEDTIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(DAYS) (DAYS)
CONTRACT 108/2004 $18,375,999 $18,375,999 0.00% 600 600
CO NO. 1 11/24/2004 $349,612 $18,725,611 1.90% 20 620
CO NO.2 2/23/2005 $169,223 $18,894,834 2.82% 15 635
CO NO. 3 4/27/2005 $571,976 $19,466,809 5.94% 20 655
CO NCA 7/2 012 0 0 5 $493,263 $19,960,072 8.62% 9 664
CO NO.5 9/2812005 $209,252 $20,169,324 9.76% 21 685
CO NOS 2/22/2006 $55,000 $20,224,324 10.06% 5 690
CO NO.7 4/26r2006 $169,962 $20,394,286 10.98% 27 717
CO NO.8 6/282006 $497,394 $20,891,680 13.69% 9 726
CO N0.9 71IM006 $643,271 $21,534,951 17.19% 0 726
CO N0.10 823/2006 $67,483 $21,602,434 17.56% 0 726
CO N0.11 9272006 $400,676 $22,003,110 19.74% 0 726
CO N0.12 Pending ($39,575) . $21,963,535 19.52% 0 726
EDMS:0038IMS7
4�
CO N0.13 Rending $438,935 "$22,403,470 21.92Yo 0 726 7
EOM5:003BI 5487
CHANGE ORDER PERFORMANCE REPORT
GISLERAEDHILL TRUNK SEWER IMPROVEMENTS,ORANGE MUNK SEWER
AND GISLER-REOHILL NORTH TRUNK SEWER,CONTACT NOS.7-36.7-39,AND 741
AND CT'OF TUSTIN PROJECT NUMBERS 6100 AND 6151
CHANGE ORDER NOS.12 AND 13
Contractor.ARE,INC Project Type.COLLECTIONS
Oesgn ConsulMnl:AKM CONSULTING ENGINEERS Con"O%Complete'.100 Original Contract Pnm: E1e.315,0119
CHANGE ORDER TYPES TRACItED INFORMATION ONLY
UnNnwnCm®tlnn BY6Rngnnsrea Clmngs Relm6msa IellaMa Nonmininunablo Nslgn BuMoUl CO T". mar TaYI
E. Emon Tncaee'
CM1ange Orden E20]T]1 IA2% E ON% 0.00% 0.00% 520).Tit 1.62% $102.58 0.55% Sa00 2.18%
tills Penp6
Change Ordenrd Et,]01,3 9.80% 3197,071 1,07 'EN),I3 2.11% E020,63a 3.30% E2,0E0.516 10.26 EB00, 3.40% S3,B2),111 1974%
D
Change Order Tobl S2,0Tq,1 1L31 E107,071 1.0M E301,43 2.11% SON.634 3.38% $3,2E/,20 1].8]% i703,15 1.00% E4021,01 21.8
Pngrem <3.00% <1A0% 0.00% <1.00% <SAM 0.00% es.00%
Perlommnce Coals
'iM Genpe DNm Mfregemenl PYn IISGe IM placealnp Inw WngeYbrrypnr
To the NegotlatW
EOMW® WlW5
Version W1I2005
eD
V
Page 1 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor: ARE, INC. C.O. No.: Twelve(12)
Date: October 25,2006
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39,Gisler RedhillMorth Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Proiect Numbers 6106, and 6151
Consultant: AKM Consulting Engineers
Amount of this Change Order(Deduct)($39 575.DD)
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
Contract No. 7-36
ITEM 1 —SINKHOLE REPAIRS AT STA. 30+00.
This Rem is for additional costs for the repair of a sinkhole developed around an existing 6-inch
asbestos cement pipe(ACP)waterline, which is located between El Camino and San Juan
intersections along Red Hill Avenue at approximate sewer station 30+00. The waterline was
protected in place by the Contractor during the sewer installation. The final asphalt cap was
completed several weeks before the sinkhole developed. The sinkhole developed due to leakage of
the 6-inch ACP waterline. The 6-inch waterline was shown in contract drawings and is located
parallel to the new sewer trench. A house connection was installed at this location and crossed the 6-
inch waterline perpendicularly. The waterline was badly deteriorated and appeared to be very fragile.
The sinkhole was approximately 70-feet long, 5-feet wide and 10-feet deep. The additional work
consisted of pavement removal and replacement,trench excavation, removal of wet and loose backfill
material, slurry backfill and waterline repair and replacement. The additional work was completed on
June 26, 2006. Rem No. 4 on previously approved Change Order No. 11 covered costs up to
May 31, 2006. This Rem covers all remaining direct costs from June 1, 2006 thru June 26, 2006.
This Rem was accomplished by Contractor's Force Account and was determined by Sanitation District
pursuant to Division 1, Section 44(B)2 of the General Requirements (Reference FCO No. 87).
ADDED COST THIS CHANGE ORDER ITEM: $62,955.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per OCSD
ARB reserving its rights as noted herein.
0
Page 2 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. ARE. INC. C.O. No.: Twelve(12)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach"A". Contract No. 7-36: Orange
Trunk Improvements, Contract No.7-39,Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 741• and City of Tustin Protect Numbers 6106 and 6151
Consultant: AKM Consulting Engineers
ITEM 2—SINKHOLE REPAIRS AT STA. 37+00
This item is for additional costs for the repair of a sinkhole developed around an existing 6-inch
asbestos cement pipe (ACP)waterline, which is located north of San Juan Avenue and Red Hill
Avenue intersection at approximate sewer station 37+00. The waterline was protected in place by the
contractor during installation of house sewer connections. Base paving was completed several weeks
before the sinkhole developed. The sinkhole developed due to leakage of the 6-inch ACP waterline.
The waterline was shown in contract drawings and was located parallel to the new sewer trench. The
waterline was badly deteriorated and appeared to be very fragile. The sinkhole was approximate 200-
feet long, 8-feet wide and 12-feet deep. This item does not cover costs for the installation of the
additional final asphalt cap, which If justified by the Contractor will be included in a future change
order. The additional work consisted of pavement removal and replacement, trench excavation,
removal of wet and loose backfill material, slurry backfill,waterline repair and replacement, and
compensation for one hour delay to the Contractors asphalt paving crew. This Item was
accomplished by Contractor's Force Account and was determined by Sanitation District pursuant to
Division 1, Section 44(B)2 of the General Requirements(Reference FCO No. 91).
ADDED COST THIS CHANGE ORDER ITEM: $138,718.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per
OCSD
ARB reserving its rights as noted herein.
Contract No. 741
ITEM 3—CURB, GUTTER AND STORM DRAIN CATCH BASIN REPLACEMENT, STATION 114+50.
This item is for additional costs to remove and replace 20-feet of curb and gutter and a storm drain
catch basin at approximate sewer station 114+50, north of 171th Street and Prospect Avenue
intersection. The proposed sewer alignment was modified from sewer station 113+15 to 124+50 due
to an undisclosed fiber optic cable. The revised alignment located the proposed sewer closer to the
existing curb and gutter and a storm drain catch basin, which had to be removed and replaced. The _
additional work consisted of concrete removal, additional excavation and backfill, installation of new
curb and gutter, and stone drain catch basin. This item was accomplished by Contractors Force
Account and was determined by Orange County Sanitation District(Sanitation District) pursuant to
Division 1, Section 44(B)2 of the General Requirements(Reference FCO NO. 83).
ADDED COST THIS CHANGE ORDER ITEM: $11,872.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per OCSD
ARB reserving its rights as noted herein.
V
Page 3 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB INC. C.O. No.: Twelve(12)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39: Gisler Redhill/North Trunk Sewer Improvements
Contract No. 7-41: and City of Tustin Proiect Numbers 6106, and 6151
Consultant: AKM Consulting Engineers
ITEM 4—CURB AND GUTTER REPLACEMENT, CITY OF ORANGE, STATION 181+00.
This item Is to compensate the Contractor for additional costs to remove and replace approximately
30-feet of curb and gutter at 12672 and 12652 North Prospect Avenue, City of Orange, CA. After
construction work was completed and during the final punch list walk through,the City of Orange
(City)requested the Sanitation District to remove and replace the curb and gutter at two locations at
approximate sewer station 181+00. At this location,the City believed that the curb and gutter was
damaged by previous work(house sewer lateral connection) done by the Sanitation District under a
different contract. The City required this curb and gutter to be removed in order to close out the
punch list and construction encroachment permit. The curb and gutter was not damaged by the
Contractor during construction, and removal and replacement was not part of the contract. Staff
directed the contractor to remove and replace approximately 30-feet of curb and gutter. This item was
accomplished by Contractor's Force Account and was determined by Sanitation District pursuant to
Division 1, Section 44(B)2 of the General Requirements(Reference FCO No. 90).
ADDED COST THIS CHANGE ORDER ITEM: $3,892.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per OCSD
ARB reserving Its rights as noted herein.
P
Page 4 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB, INC. C.O. No.: Twelve(12)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach"A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 741: and City of Tustin Project Numbers 6106, and 6151
Consultant: AKM Consulting Engineers
Contract No. 7.36, 7.39, 7-41, 6106 &6161
ITEM 5—ADJUSTMENT OF ENGINEER'S QUANTITIES
Additions:
CNWLjn�r84mh
No. Description Fran To DltF Unit Price Trial
nchfied day 3,256.00 3,275.00 19.00 $320.00 $6,080.00
inch7-38Uneefied day 1,800.00 1,828.50 28.50 $350.00 $9,975.00
clh verified 1,386.00 1,391.00 5.00 $240.00 $1.200.00
Feet day pipe
25 Linear 84nch vit fled 439.00 484 45.00 $350.00 $15,750.00
Feet day pipe
7-39 25 Vertical 60-inch 425.00 438 13.00 $850.00 $8,450.00
Feet manhole
33 Each House lateral 92.00 104 12.00 $4,500.00 $54.000.00
connections
Unear 274nch
39 Feetvitrified day 9.025.00 9037 12.00 $370.00 $4,440.00
741 pipe
Linear 21-inch
41 Feet vitrified day 5,360.00 5381 21.00 $320.00 $6,720.00
pipe
6-hch PVC
L76 Fe water s46.00 65s 11.00 $115.ao s1,285.00
in
Each Pub 2.00 3 1.00 $2.500.00 $2,500.00
Subtotal $110,3B0.00
y
Page 5 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARO. INC. C.O. No.: Twelve(12)
Date: October 25 2006
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No 7-36. Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements,
Contract No. 7-41: and City of Tustin Project Numbers 6106 and 6151
Consultant: AKM Consulting Engineers
Deductions:
CN Bid
No. Item Unit Description From To Diff Unit Price Total
No.
11 VaNeelcal 48-inch manhole 210.00 201.00 (9.00) $330.00 ($2,970.00)
Linear 48-inch jacked
12 Feet steel casing 188.00 159.75 (28.25) $1,700.00 ($46,025.00)
7-36 Cubic 3l44nch pushed
14 Yards rock,0"to 12" 200.00 0.00 (200.00) $40.00 ($8,000.00)
15 Cubic 3/4-Inch pushed p00.00 0.00 (200.00) $45.00 ($9,000.00)
Yards rock, 12"to 24"
22 Linear 18-inch vitrified 21365.00 2,355.00
Feet clay pipe (10.00) $320.00 ($3,200.00)
24 Linear 124nch vitrified 4,038.00 3,583.00 (455.00) $260.00 ($118,300.00)
Feet clay pipe
7-39 28 Linear 304nchjacked 50.00 28.99 (21.01) $2,500.00 ($52,528.00)
Feet steel casing
30 Cubic 314-inch crushed Y00,00 0.00 (200.00) $40.00 ($8,000.00)
Yards rock,0"to 12"
31 Cubic 3/4-inch crushed 200.00 0.00 (200.00) $45.00 ($9,000.00)
Yards rock, 12"to 24"
40 Linear 24-Inch vitrifietl Feet clay pipe 568.00 530.00 (38.00) $490.00 ($18,620.00)
47 Vertical 60-Inch manhole 483.00 469.00 (14.00) $670.00 ($9,380.00)
t 1
741 49 Linear 48-inch jacked 68.00 34.24 (23.76) $2,200.00 ($52,278.00)
Feet steel casin
51 Cubic 3144nch pushed 200 00 Q00 (200.00) $40.00 ($8,000.00)
Yards rock, 0"to 1T'
52 Cubic 314-inch crushed 200.00 1 0.00 (200,00) $45.00 ($9,000.00)
Yards rock, 12"to 24"
0
Page 6 of 8
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARE, INC. C.O. No.: Twelve(12)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach"A°. Contract No. 7-36: Orange
Trunk Improvements.Contract No.7-39:Gisler Redhill/North Trunk Sewer Imorovemerds:
Contract No. 7-41: and City of Tustin Proiect Numbers 6106, and 6151
Consultant: AKM Consulting Engineers
Dedueltorrs(Continuation):
Bid
NOON Rem Unit Description From To Di8 Fri Total
No.
6151 73 FSqure Slurry Seal 5,000.00 0.00 (5000.00) $0.30 ($1,500.00)
75 Fir Sawcut AC or PCC 2,300.00 1.203.00 (1097.00) $1.00 ($1,097.00)
83 Cubic AC Pavement 112.00 63.00 (49.01)) $130.00 ($6,370.00)
6106 Yards Replacement
85 Square R8R Cross Gutter 8 1,000.00 0.00 (1000.00) $6.00 (56,000.00)
Feet Spandrel
87 FSgwm 00.
Slurry
Seal 2.000.00 0.00 (2000) 1 $0.30 ($600.00)
Sublotal ($371,868.00)
Subtotal ($261,488.00)
Ad)ushrrentduea $447600
bid deduction
TOTAL $257,012.00
CREDIT COST THIS CHANGE ORDER ITEM: ($257,012.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ARE reserving its rights as noted herein.
TOTAL CREDIT COSTS THIS CHANGE ORDER: ($39,575.00)
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
V
Page 7 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB, INC. C.O. No.: Twelve(12)
Date: October 25,2006
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36 Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Protect Numbers 6106. and 6151
Consultant: AKM Consulting Engineers
The compensation set forth in this change order comprises the total compensation due to the
contractor by Sanitation District, including all of contractor's subcontractors and suppliers,for the
direct cost to perform the work or change described in this change order, but does not include any
compensation for contractors or its subcontractors and suppliers, extra costs caused by or resulting
from delays, impacts(including productivity impacts)and/or disruptions arising out of, related to
and/or caused by the work or change described in this change order, if any. By executing this change
order,the Contractor shall not be deemed to waive 8s right to seek additional time and/or
compensation for delays, impacts(including productivity Impacts) and/or disruptions arising out of,
related to and/or caused by the work or change described in this change order, all such rights and/or
claims are hereby expressly reserved by Contractor for itself and its subcontractors and suppliers.
Nothing contained herein shall be deemed as a waiver by Sanitation District of the Contractor's
contractual obligations set forth in the contract with Orange County Sanitation District for this project.
SUMMARY OF CONTRACT TIME
Original Contract Date: April 5, 2004
Original Contract Time: 600 Calendar Days
Original Completion Date: November 25, 2005
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: 126 Calendar Days
Revised Contract Time: 726 Calendar Days
Revised Final Completion Due Date: March 31, 2006
Time Subject to Liquidated Damages: TBD
Actual Final Completion Date: N/A
Original Contract Price $18,375,999.00
Prev.Authorized Changes $ 3,627,111.00
This Change(Deduct) ($ 39,575.00)
Amended Contract Price $21,963,535.00
a
Page 8 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB. INC. C.O. No.: Twelve(12)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41* and City of Tustin Project Numbers 6106 and 6151
Consultant: AKM Consulting Engineers
Board Authorization Date: October 25, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Hardat Khublall, P.E. Date
CIP Project Manager
Approved by:
David A. Ludon P.E. Date
Director of Engineering
Accepted by:
ARE, INC.
Contractor Date
EOMS:OM154M
0
Page 1 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
UNILATERAL CHANGE ORDER
Contractor: ARB. INC. C.O. No.: Thirteen (13)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer, Reach W. Contract No. 7-36, Orange
Trunk Improvements,Contract No.7-39:Gisler RedhllllNorth Trunk Sewer Imnrovements�
Contract No. 741: and City of Tustin Protect Numbers 6106, and 6151
Consultant: AKM Consulting Engineers
Amount of this Unilateral Change Order(Add)$439 935.00
In accordance with contract provisions, the following changes in the contract andlor contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
Contract No. 7-36
ITEM 1 —CITY OF TUSTIN TRAFFIC CONTROL MODIFICATIONS AND ALIGNMENT CHANGES
AT MITCHELL, NISSON AND EL CAMINO REAL INTERSECTIONS.
This item is to compensate the Contractor for additional costs due to traffic control modifications
requested by the City of Tustin (City)at Mitchell, Nisson and El Camino Real intersections along
Red Hill Avenue,from sewer station 9+92 to 20+46 and at sewer station 27+00, and for additional
costs due to alignment changes at Mitchell and Nisson intersections. Prior to the implementation of
the traffic control drawings included under the contract documents,the City requested traffic control
modifications, which included the installation of temporary striping, reconfiguration of traffic closures
from single phase to multiple phases, additional traffic control devices, modification of permitted
working hours from weekdays to weekends, and installation of changeable message boards. The
traffic control drawings included under the contract documents had been reviewed and approved by
the City prior to construction. The alignment changes at Mitchell and Nisson intersections were
needed due to the interference of two undisclosed 8-inch asbestos cement waterline thrust blocks.
The waterlines were shown in contract drawings but the water valves and thrust blocks were not
shown on contract drawings. The additional work included additional striping,traffic delineators,
compensation for overtime due to work restricted only to weekends, impacts to work due to traffic
phasing, impacts to work due to change of alignment. For this item,the Contractor was directed to
proceed under time and material basis by the Sanitation District, and during the course of
construction,the Contractor failed to submit daily reports to the Sanitation District for review and
acceptance. The Contractor requested compensation for this item in the amount of$360,684. The
costs submitted by the Contractor included a credit for contract work based on the Contractor's
baseline durations and additional costs for the contract and extra work based on actual durations.
The Sanitation District disagreed with the Contractor's method of quantification of the additional costs.
Therefore,the Sanitation District will compensate the Contractor under this item for the additional
costs based on its assessment of an equitable adjustment of the changes required (Reference FCO
Nos. 38, 54 and 56).
ADDED COST THIS CHANGE ORDER ITEM: $230.215.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 2 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
UNILATERAL CHANGE ORDER
Contractor: ARB, INC. C.O. No.: Thirteen(13)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach `A". Contract No. 7-36: Orange
Trunk Improvements Contract No.7-39&Gisler Redhill/North Trunk Sewer Improvements:
Contract No 7-41' and City of Tustin Protect Numbers 6106.and 6151
Consultant: AKM Consulting Engineers
ITEM 2—CITY OF TUSTIN TRAFFIC CONTROL MODIFICATIONS AND UTILITY CONFLICTS AT
BRYAN AVENUE INTERSECTION
This Rem is for extra costs associated with traffic control and working hour modifications requested by
the City of Tustin (City) at Bryan Avenue and Red Hill Avenue intersection, and for additional costs
due to conflicts with an existing 63-inch storm drain, an existing 48-inch manhole and an existing 12-
inch sewer lateral. Prior to the implementation of the traffic control drawings included in the contract
documents,the City requested traffic control modifications which included additional traffic control
devices, reconfiguration of traffic closures from single phase to multiple phases, modification of
permitted working hours on weekdays and modification of permitted work from weekdays to
weekends. The traffic control drawings included in the contract documents had been reviewed and
approved by the City prior to construction. During construction, R was found that an existing 63-inch
storm drain conflicted with the proposed sewer;the 63-inch storm drain was shown in contract
drawings to be 5-feet above the proposed sewer but was actually 2 feet above the proposed sewer,
and consisted of a storm drain box with a 9-foot wide overpoured concrete bottom. The dimensions of
the 63-inch storm drain were obtained during design from available record drawings. Additional
excavation was required to tunnel under the storm drain box. In addition, an existing 48-inch manhole
that was not shown in contract drawings conflicted with the proposed sewer and was removed by the
Contractor. The contract required an 8-inch lateral, E-1 to be installed but it was discovered during
construction that a 12-inch was needed to match the existing. The Contractor was directed to upsize
the lateral to 12-inch and install a 60-inch manhole for its connection instead of the 48-inch manhole
required by contract drawings. For this item,the Contractor was directed to proceed under time and
material basis by the Sanitation District, and during the course of construction, the Contractor failed to
submit daily reports to the Sanitation District for review and acceptance. The Contractor requested
compensation for this Rem in the amount of$243,523. The costs submitted by the Contractor
included a credit for contract work based on the unit prices under the bid items and additional costs
for the contract and extra work combined, based on the Contractor's foramens' reports. The
Sanitation District disagreed with the Contractor's method for quantification of the additional costs.
Therefore,the Sanitation District will compensate the Contractor under this item for the additional
costs based on its assessment of an equitable adjustment of the changes required (Reference FCO
No. 79).
ADDED COST THIS CHANGE ORDER ITEM: $88,219.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
a
Page 3 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
UNILATERAL CHANGE ORDER
Contractor: ARE, INC. C.O. No.: Thirteen (13)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach'A". Contract No. 7-36, Orange
Trunk Improvements,Contract No.7-39:Gisler RedhiWNorth Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Prefect Numbers 6106,and 6151
Consultant: AKM Consulting Engineers
ITEM 3—ADDITIONAL FINAL ASPHALT CAP ALONG REDHILL AVENUE
This item is to compensate the Contractor for additional asphalt cap installed along Red Hill Avenue
due to the following changes: 1)Additional 1.5-inch asphalt cap at the intersection of Red Hill Avenue
and El Camino Real intersection due to the development of a sinkhole after the final asphalt cap was
installed. 2) Installation of rubberized asphalt per City of Tustin's request at Bryan Avenue and Red
Hill Avenue intersection. Rubberized asphalt installation is not required per contract documents.
3) Installation of a 0.15-foot (1.8-inches)final rubberized asphalt cap instead of the contract required
0.12-foot(1.444nches)on Red Hill Avenue between approximate sewer stations 68+65 to 76+00.
This change was requested by the County of Orange for all final paving within the County of Orange
Right-of-Way. 4) Installation of additional asphalt cap due to the alignment modifications at Kalua
Lane and 1st Street intersection on Red Hill Avenue, and 5)Additional asphalt due to the added
80-feet house connection at sewer station 43+76. The Contractor requested compensation for this
item in the amount of$75,731, but the Contractors submittals did not provide sufficient explanation
and justification as required by Contract for the additional compensation requested. Therefore,the
Sanitation District will compensate the Contractor under this item for the additional costs based on its
assessment of an equitable adjustment of the changes required (Reference FCO No. 88).
ADDED COST THIS CHANGE ORDER ITEM: $37,275.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 4 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
UNILATERAL CHANGE ORDER
Contractor: ARB, INC. C.O. No.: Thirteen (13)
Date: October 25, 2008
Job: Gisler Redhill North Trunk Sewer Reach'K. Contract No. 7-36: Orange
Trunk Improvements Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements
Contract No 741 7 and City of Tustin Project Numbers 6106 and 6151
Consultant: AKM Consulting Engineers
ITEM 4—ADJUSTMENT OF ENGINEER'S QUANTITIES, BID ITEM No. 17
This item is to compensate the Contractor for the additional house connections installed as estimated
under Contract Bid Item No. 17. Contract documents estimated 47 house connections to be installed
under Contract Bid Item No. 17. Five additional house connections were added during construction
beyond the 47 included under the Contract documents. The additional house connections were not
identified on the original contract drawings, but were required during construction. Also, after the
Contract was awarded,the design was changed at the request of the City of Tustin to include
additional properties with septic systems for future connection to the Sanitation District's tmnk sewer.
The Contractor disagreed with the Sanitation District and believed that eight house connections were
added instead of five. The Contractor has not provided sufficient explanation and justification, as
required by Contract, for compensation in the amount requested. In addition,the Contractor has
requested compensation for each additional house connection by using a unit price of$12,498.50
each. The unit price under Contract Bid item No. 17 is $4,500 each. The Sanitation District
disagreed with the Contractors requested increased unit price and believed that the$4,500 unit price
per Bid Item No. 17 is applicable for this added work. Therefore,this item compensates the
Contractor for the installation of five additional house connections. (Reference Contract Bid Item No.
17).
Additions:
CN Bid
No. Item Unit From To DM UnitPrice Total
No.
7-36 17 Each House laterel connettiwra 47 52 5 $4,500 $22.500.00
Subtotal $22,500.00
Adjustrnent due to ( �)
bid deduction
TOTAL 1 $22.115.00
ADDED COST THIS CHANGE ORDER ITEM: $22,115.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 5 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
UNILATERAL CHANGE ORDER
Contractor: ARB INC. C.O. Ng.: Thirteen f131
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer, Reach W. Contract No.7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler RedhilMorth Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Protect Numbers 6106. and 6151
Consultant: AKM Consulting Engineers
Contract No. 741
ITEM 5—ADDITIONAL HOUSE CONNECTIONS
This Rem is to compensate the Contractor for the additional house connections installed beyond
Contract Bid Rem No. 54 and previous Field Change Order(FCO) No. 1, approved by the Board on
November 24. 2004 under Item 1 of Change Order No. 1. Contract documents required the
Contractor to install 99 house connections under Contract Bid Item No. 54, and 40 additional house
connections were added under FCO No. 1 for a total of 139. Eleven additional house connections
were added during construction beyond the 139 previously approved. The additional house
connections were not identified on the original contract drawings and were needed during
construction.Also, after the Contract was awarded,the design was changed at the request of the City
of Tustin to include additional properties with septic systems for future connection to the Sanitation
District's trunk sewer. The Contractor disagrees with the Sanitation District and believes that 15
house connections were added, instead of 11. The Contractor has not provided sufficient explanation
and justification, as required by Contract,for compensation in the amount requested. In addition,the
Contractor has requested compensation for each additional connection by using a unit price of
$12,498.50 each. The unit price under Contract Bid item No. 54 and Field Change Order No. 1 is
$4,500 each. The Sanitation District agreed with the Contractor's statement that the bid quantities
have been exceeded by more than 25% and that the unit price of$4,5001each is not applicable
anymore. However,the Sanitation District disagreed with the Contractor's requested unit cost and
believed based on its assessment,that a reasonable unit cost is$8,524 each. This Rem
compensates the Contractor for 11 additional house connections at$8,524 each (Reference FCO
No.1, Contract Bid Item No. 54).
ADDED COST THIS CHANGE ORDER ITEM: $93,764.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 6 of 9 r
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
UNILATERAL CHANGE ORDER
Contractor: ARB. INC. C.O. No.: Thirteen (13)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer Reach"A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Project Numbers 6106 and 6151
Consultant: AKM ConsuNina Engineers
ITEM 6—.ADDITIONAL FINAL ASPHALT CAP ALONG PROSPECT AVENUE
This item is to compensate the Contractor for additional asphalt cap installed along Prospect Avenue
from 17th Street to Chapman Avenue intersections due to the following changes: 1)Additional
capping at Fairhaven and Prospect Avenue intersection due to the interference of a 20-inch East
Orange County Waterline. Direct casts were approved by the Board on July 19, 2006 under Item 2 of
previous Change Order No. 9, but final asphalt cap costs were not included. 2)Additional capping
was required due to three additional house connections. Direct costs were approved by the Board on
August 23,2006 under Item 2 of previous Change Order No. 10, but final asphalt cap costs
were not included. 3)This Rem included a credit for the asphalt cap deleted at Chapman Avenue
and Prospect Avenue intersection due to the revised alignment. The Contractor submitted a request
for additional compensation in the amount of$98,667 and included several areas where the final
asphalt cap was required per Contract documents. The Contractor has not provided sufficient
explanation and justification, as required by the Contract,for compensation in the amount requested.
Therefore,this Rem compensates the Contractor for the additional capping installed along Prospect
Avenue from 17th Street to Chapman Avenue intersections based on the Sanitation District's
assessment of an equitable adjustment of the changes required (Reference FCO No. 64 and No. 41,
RFI No. 40).
ADDED COST THIS CHANGE ORDER ITEM: $9,556.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 7 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
UNILATERAL CHANGE ORDER
Contractor: ARB. INC. C.O. No.: Thirteen(13)
Date: October 25.2006
Jab: Gisler Redhill North Trunk Sewer. Reach "A". Contract No.7-36: Orange
Trunk Improvements.Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements
Contract No. 741,and City of Tustin Protect Numbers 6106, and 6151
Consultant: AKM Consulting Engineers
ITEM 7—ADDITIONAL PAVING AND CREDIT FOR BASE MATERIAL, STATION 127+00 TO 166+00
This item is for the additional base paving and for the deletion of base material required by Contract
Documents on Prospect Ave between stations 127+00 to 166+00. During the main line installation
from sewer station 127+00 to 166+00,the Contractor was given two options by the County of Orange
for replacement of the street pavement section. The first option was to replace the asphalt section
removed with an equivalent deep lift section of 10-inch asphalt concrete(AC) only, and no base
material. The second option was to replace the existing asphalt section encountered with an
equivalent section that is calculated by adding one inch to the AC thickness and for the base,
multiplying two times the thickness of the AC section plus one inch. Both of the options provided by
the County of Orange provided significant cost savings, since they required less or no base material
compared with the Contract Requirements, The Contractor at its own discretion elected the first
option and installed a deep lift section of 10-inch thick AC,without base material. At the end of the
construction,the Contractor requested additional compensation in the amount of$98,496. The
Contractor believed that additional compensation is justified based on the additional thickness
installed. The Sanitation District disagreed with the Contractor's request. Based on precedence of
previously agreed Change Order(CO) No. 5, Item 2, Field Change Order(FCO) No.40; CO No.3,
Item 7, FCO No. 32, and CO Not, Item 7, FCO No. 17, the Contractor and the Sanitation District
agreed in the past to quantity the additional costs by taking a credit for the base material,which was
not installed but required by contract documents, and adding the costs to remove and replace the
increased AC thickness. After the Sanitation District's review of the Contractor's documents submitted
for this FCO, it was found that a credit based on the balance of additional base asphalt and base
material not installed was due to the Sanitation District but not included in the Contractor's request for
compensation (Reference FCO No. 76).
CREDIT COST THIS CHANGE ORDER ITEM: $(41,209.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL ADDED COSTS THIS UNILATERAL CHANGE ORDER: $439,935.00
TOTAL TIME EXTENSION THIS UNILATERAL CHANGE ORDER: 0 Calendar Days
Page 8 of 9
ORANGE COUNTY SANITATION DISTRICT
110844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
UNILATERAL CHANGE ORDER
Contractor: ARB, INC. C.O. No.: Thirteen (13)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36 Orange
Trunk Improvements, Contract No.7-39,Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41� and City of Tustin Project Numbers 6106 and 6151
Consultant: AKM Consulting Engineers
SUMMARY OF CONTRACT TIME
Original Contract Date: April 5,2004
Original Contract Time: 600 Calendar Days
Original Completion Date: November 25,2005
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Exlension: 126 Calendar Days
_ Revised Contract Time: 726 Calendar Days
Revised Final Completion Due Date: March 31, 2006
Time Subject to Liquidated Damages: TBD
Actual Final Completion Date: N/A
Original Contract Price $18,375,999.00
Prev. Authorized Changes $ 3,587,536.00
This Change(Add) $ 439,935.00
Amended Contract Price $22,403,470.00
i
Page 9 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
UNILATERAL CHANGE ORDER
Contractor. ARB, INC. C.O. No.: Thirteen (13)
Date: October 25, 2006
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36:Orange
Trunk Improvements,Contract No.7-3R Gisler RedhillvNorth Trunk Sewer Improvements:
Contract No. 7-4 V and City of Tustin Pro act Numbers 6106, and 6151
Consultant: AKM Consulting Engineers
Board Authorization Date: October 25, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Hardat Khublall, P.E. Date
CIP Project Manager
Approved by:
David A. Ludyrin P.E. Dale
Director of Engineering
EDMS 00381 MM
PDC COMMITTEE Meeting Date To go.of Dir.
10/05/06 10/25/06
J AGENDA REPORT Item Number Item Number
PDO06-107 11(h)
Orange County Sanitation District
sStrategic 6
Master Planning
FROM: David Ludwin, Director Of Engineering
Originator: Alberto Acevedo, Project Manager
SUBJECT: AMENDMENT NO. 5 TO SUPPLEMENT NO. 1 TO THE 1999
STRATEGIC PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT,
JOB NO. J-40-5
GENERAL MANAGER'S RECOMMENDATION
(1) Approve a budget increase of$38,235 for Supplement No. 1 to the 1999 Strategic
Plan Final Program Environmental Impact Report, Job No. J-40-5, for a total project
budget of$946,235; and (2)Approve Amendment No. 5 to the Professional Services
Agreement with Environmental Science Associates, providing for additional
environmental services for an additional amount of$5,706, increasing the total amount
not to exceed $574,206.
SUMMARY
• The Professional Services Agreement (PSA) with Environmental Science Associates
(ESA) provides for Supplemental Environmental Impact Report (EIR) Nos. 2, 3, 4,
and 5 to update the 1999 Strategic Plan Final Program Environmental Impact Report
(PEIR) for the following four projects: (1) Treatment Plant No. 2 Headworks
Replacement Project, Job No. P2-66; (2) Newport Trunk Sewer and Force Mains
Replacement Project, Contract No. 5-58; (3) Ellis Avenue Pump Station Replacement
Project, Contract No. 1-10; and (4) Rocky Point Pump Station Replacement Project,
Contract No. 5-50.
• The California Coastal Commission (CCC) requested that additional detailed
environmental analysis be prepared beyond that identified in the EIR for the Newport
Trunk Sewer and Force Mains Replacement Project, Contract No. 5-58.
• Under this proposed Amendment No. 5, ESA will provide the additional detailed
environmental analysis and documentation. No additional work is anticipated under
this PSA.
PRIOR COMMITTEE/BOARD ACTIONS
Please refer to the attached PSA status report.
PROJECT/CONTRACT COST SUMMARY
As indicated in the attached Budget Information Table, authorization of$5,706 is
requested for the existing PSA for a total amount not to exceed $574,206.
Page 1
BUDGETIMPACT ,
❑ This item has been budgeted.
® This item has been budgeted, but there are insufficient funds. Line item: (Page 132,Section e.
FV 04105)
❑ This item has not been budgeted.
❑ Not applicable (information item)
A budget increase of$38,235 is being requested to pay for this amendment and higher
than anticipated costs to advertise and process the EIR. This money will come from
capital reserve funds.
ADDITIONAL INFORMATION
The Consultant's PSA has provided for a total of 15 Project modifications to the
Program EIR including the project-specific EIR for the Newport Trunk Sewer and Force
Mains Replacement Project.
The analysis contained in the EIR for Newport Trunk Sewer and Force Mains
Replacement Project consisted of abandonment and replacement of pipeline along an
existing 30-foot, raised utility road that traverses the Santa Ana River Marsh. The
pipelines would be installed within the existing easement and disturbed utility roadway
from the Bitterpoint Pump Station in Newport Beach to Treatment Plant No. 2 to handle
projected 2020 peak flows. Micro-tunneling would be to be employed to install the
pipelines beneath the Santa Ana River (SAR) into Treatment Plant No. 2.
To avoid the nesting season (February— September) of sensitive habit (e.g. Belding
Savannah Sparrow, Least Tern) ESA's biologists conducted a field survey in January
2006 to delineate potential wetlands and water-associated habitat as defined by the
California Coastal Act. Detailed data on vegetation, soils, hydrology, and wildlife were
collected along the 2,060-foot length of the Project alignment.
The Wetland Delineation and Avoidance plan prepared for the Newport Trunk Sewer
and Replacement Project was completed in April 2006 and concluded that no wetlands
subject to CCC review would be adversely affected by the Project. The Project would
occur entirely in disturbed upland areas within the existing utility easement. Although
the alignment boundaries occur in closed proximity to wetland areas and to a small
amount of tidal channel area, mitigation measures established during the CEOA
process would adequately protect the surrounding marsh areas and avoid any adverse
impacts associated with the Newport Trunk Sewer and Force Mains Replacement
Project.
ALTERNATIVES
No alternatives are being presented since the work has been done and the project
cannot proceed without a CCC permit.
Page 2
CEQA FINDINGS
On March 23, 2005 the Sanitation District's Board of Directors (Board) certified the Final
EIR for the Newport Trunk Sewer and Force Mains Replacement Project, Contract
No. 5-58. The Board, however, did not take specific action to approve the Project
alignment (Alternative 2C in the EIR), as the "project" until April 2005. The Notice of
Determination for this Project was filed with the County of Orange and the State of
California on April 28, 2005.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Fee Proposal
AAC:kf
KWepBagenda\Bcard Agenda Repons=D5 Board Agenda ReporonlU Mtem 11(h).J4M.doc
Page 3
BUDGET INFORMATION TABLE
Supplement No. 1 to the 1999 Strategic Plan Program Environomental Impact Report
JOB NO.J-40-5
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE DECREASEBUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
Phase t -Pro ect Development
Phaw 2-Pnefinninar,Des n $ 148000 $ 908,000 $ 38.235 S 946.235 S 940,529 S 5706 S 946.235 $ 940.529 99%
Phase 3-Design
Phase 4-Constucton
Phase 5-Commissioni
Phase 6-Close-Out
Phase 7-Contin n
PROJECTTOTAL S 148.000 $ 908.000 $ 38.235 S 946.235 $ 940.529 $ 5,706 $ 946.235 S 940,529 99%
Reimbursable Casts
PROJECT NET I S 148.000 $ 908.000 1 S 38.235 1 S 946235 S 94D.529 $ 5,706 S 946,235 S 940,529 1 0%
PSAIContnct
Design PSA $ 77.830 S 560,500 $ 5.706 $ 574.206 11 S 568.500 1 S 6,706 $ 574,206 S 574,206 100%
ConaVuction Contact
EDM5:003616590
ELMS.003816590 Pape 1 J40-5-BuJget Info Table 090606
Professional Services Agreement Status Report
Supplement No. 1 to the 1999 Strategic Plan Program Environmental Impact Report
Job No. J-40-5
Total Project Budget: $908,000
Consultant: Environmental Science Associates (ESA)
Start Date of Project: March 28, 2001
Date Amendment Description Cost Accumulated
Costs
Supplement No. 1 to the 1999 Strategic Plan Program
Environmental Impact Report(PEIR). The work is to
3/28/01 Original PSA support additional environmental documentation $77,830 $77,830
projects under design, or were not included in the 1999
Strategic Plan EIR analysis.
To address upcoming collection system and treatment
plant projects that require additional environmental
3/27102 1 analysis and documentation to supplement the $116,170 $194,000
Strategic Plan EIR. A budget increase is also required
for FY 2001-02 throw h FY 2002-03.
To address four projects that will require additional
environmental analysis and documentation,
6/25/03 2 Supplemental Nos. 2, 3, 4 and 5,to the 1999 Strategic $178,500 $372,500
Plan EIR. A budget increase is also required for FY
2002-03 through FY 2003-04.
To address the four projects identified in Amendment
No. 2 that will require revisions to the environmental
4/28104 3 analysis and documentation necessary for preparation $141,000 $513,500
of Subsequent or Tiered EIRs. A budget increase is
also required for FY 2004-05.
To address the two projects identified in Amendment
No. 3 that will require additional revisions to the
2/23/05 4 environmental analysis and documentation necessary $55,000 $568,500
for preparation of Tiered EIRs. A budget increase is
also required for FY 2005-06.
To prepare detailed environmental analysis and
documentation for the Newport Trunk Sewer and Force
Proposed 5 Mains Replacement Project, as required by the $5,706 $574,206
California Coastal Commission. A budget increase is
also required for FY 2005-07.
AAC:kf
EDMS: 003816585
i
MINUTES OF THE REGULAR JOINT MEETING OF THE
FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE & STEERING COMMITTEE
Orange County Sanitation District
Wednesday, October 11, 2006, 5:00 p.m.
A joint meeting of the Finance, Administration and Human Resources Committee and the
Steering Committee of the Orange County Sanitation District was held on October 11, 2006, at
5:00 p.m., in the Sanitation District's Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
FAHR COMMITTEE MEMBERS: STAFF PRESENT:
DIRECTORS PRESENT: Jim Ruth, Interim General Manager
Darryl Miller, Chair Bob Ghirelli, Acting Assistant General Manager
Mike Duvall, Vice Chair Lorenzo Tyner, Director of Finance and
Bill Dalton Administrative Services
Rich Freschi David Ludwin, Director of Engineering
Phil Luebben Jeff Reed, Human Resources Manager
Joy Neugebauer Mike White, Controller
Mark Waldman Lilia Kovac, Committee Secretary
Doug Caved, Board Vice Chair Norbert Gaia
Juanita Skillman
OTHERS PRESENT:
DIRECTORS ABSENT: Brad Hogin, General Counsel
James W. Silva Brian Gruber, Lance, Sell & Lunghard
Jim Ferryman, Board Chair Richard Kikuchi, Lance, Sell & Lunghard
Shinsh Patel, Lance, Sell & Lunghard
Ed Soong, Public Resources Advisory Group
Lon Koh
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Chair Miller did not give a report.
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, did not give a report.
Minutes of the Regular Joint meeting of the Finance, Administration and Human \
Resources Committee and Steering Committee Meeting
October 11, 2006
Page 2
(6) REPORT OF DIRECTOR OF FINANCE AND ADMINISTRATIVE SERVICES
Lorenzo Tyner, Director of Finance, did not give a report.
(7) REPORT OF GENERAL COUNSEL
Brad Hogin, General Counsel, informed the Committee members that he would be conducting Ethics
training in-house, as required by Assembly Bill AB1234. He also asked those directors that have
already completed their Ethics training submit a copy of the certificate of completion to the Board
Secretarys office of the Sanitation District for the files.
(8) CONSENT CALENDAR ITEMS
Consideration of motion to approve all agenda items appearing on the Consent Calendar not
specifically removed from same, as follows:
a. Approve minutes of the September 13, 2006 joint meeting of the Finance, Administration
and Human Resources Committee and Steering Committee meeting.
b. FAHRO6-67 Receive and file Employment Status Report as of September 18,2006.
c FAHRO6-68 Receive and file OSHA Incidence Rates and Workers' Compensatlon
Claims and Costs Report.
d. FAHRO6-69 Recommend to the Board of Directors to Approve Amendment No. 1 to
the agreement with the State of California, Department of Parks and
Recreation, providing for a change to the billing methodology for sewer
services for Boise Chica State Beach.
Motion: It was moved, seconded, and duly carried to approve the recommended action
for the item specified as 8(a)through 8(d).
Director Freschi abstained from voting on Item 8(a).
END OF CONSENT CALENDAR
e. Consideration of items deleted from Consent Calendar, if any.
(9) ACTION ITEMS
a. FAHRO6-70 Recommend to the Board of Directors to authorize extension of a service
contract with Public Resources Advisory Group (PRAG)for financial
advisory services for an additional five-year period effective November
2006.
Motion: It was moved, seconded, and duly carried to approve the recommended
action.
Minutes of the Regular Joint meeting of the Finance, Administration and Human
Resources Committee and Steering Committee Meeting
October 11, 2006
Page 3
(10) INFORMATIONAL ITEMS
a. FAHR06-71 Independent Accountant Report on the Capital Improvement Program's
Procurement Procedures and Internal Controls
Lorenzo Tyner introduced Richard Kikuchi of Lance, Sol[and Lunghard
who presented their independent report and findings of the District's
Capital Improvement Program's Procurement Procedures and Internal
Controls. Director of Engineering, David Ludwin, presented a response to
the recommendations made on the auditors report.
b. FAHR06-72 Retirement and benefits program review
Lorenzo Tyner presented a verbal report on Bartel Associates, LLC's
Benefits Review. A follow up meeting was scheduled for Thursday,
October 26, 2006.
C. FAHR06-73 Succession Management Program Update
Jeff Reed presented the major components of the Succession
Management program, and will be periodically reporting progress to the
committee.
d. FAHR06-74 Management of Property and Liability Insurance Programs
Mike White briefly presented facts on the differentjoint insurance
programs available to the Sanitation District for the various needs of the
agency this size. Staff will prepare a comparative analysis of joint powers
insurance authority and report back to the committee in November with
options.
(11) CLOSED SESSION
There was no closed session.
(12) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
There were none.
Minutes of the Regular Joint meeting of the Finance,Administration and Human .
Resources Committee and Steering Committee Meeting
October 11, 2006
Page 4
(14) FUTURE MEETING DATES
The adjourned meeting is scheduled to reconvene Thursday, October 26,2006 at 7:00 p.m. The
next regular FAHR Committee meeting is scheduled for November 8, 2006, at 5 p.m.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 6:30 p.m.
Submitted by:
Ulia (ovac
Committee Secretary
H:VeprlegendaWAHR1FAHR200V1106105.101106 FAHR Minut .dw
FAHR COMMITTEE Mewing Date To Dd.or .Dir.
10/11/06 10/25/O6
AGENDA REPORT RmnNumbw rtemNumber
FAHDM-69 12(b)
Orange County Sanitation District
FROM: Mike White, Controller
Originator: Angela Brandt, Accounting Supervisor
SUBJECT: AMENDMENT NO. 1 TO BOLSA CHICA STATE BEACH SEWAGE
AGREEMENT
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the agreement with the State of California, Department of
Parks and Recreation, providing for a change to the billing methodology for sewer
services for Bolsa Chica State Beach.
SUMMARY
The Sanitation District currently invoices the Department of Parks and Recreation for
sewage service for Boise Chica State Beach on an annual basis. The original
agreement stipulates that the charge be based upon water consumption from a specific
water meter at the State's metering facility.
The Sanitation District also invoices the Department of Parks and Recreation for
sewage service for Huntington State Beach on an annual basis. The methodology for
determining the sewer service charge within this agreement is based upon water
consumption from all water meters servicing the beach.
That water meter located at Boise Chica State Beach is no longer operational and the
Department of Parks and Recreations has requested that the charge be computed in
the same manner as the Huntington State Beach Sewage Agreement, or based upon
the water consumption from all water meters servicing the Boise Chica State Beach.
PRIOR COMMITTEE/BOARD ACTIONS
The Boise Chica State Beach Sewage Agreement was entered into on March 15, 1974.
The Huntington State Beach Sewage Agreement was entered into on July 13, 1983.
PROJECT/CONTRACT COST SUMMARY
N/A
F..N. Ow-t02< ft nE Report—FA R
Dept]20 RevieM. 1011fi/P0�
Page 1
BUDGETIMPACT
❑ This item has been budgeted. tine item:
❑ This Rem has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
N/A
Fom No.a iw4 Aq .p -FMR
�M�o NwIW. W16"ON
Page 2
FAHR COMMITTEE Meetl00Date TOB15",.
10/11/06 3j
0/ /06
AGENDA REPORT Stem Number Rem Number
FAHR06-70 12(c)
Orange County Sanitation District
FROM: Lorenzo Tyner, Director of Finance
Originator: Mike White, Controller
SUBJECT: RENEWAL OF FINANCIAL ADVISOR CONTRACT
GENERAL MANAGER'S RECOMMENDATION
Authorize extension of a service contract with Public Resources Advisory Group
(PRAG) for financial advisory services for an additional five-year period effective
November 2006.
SUMMARY
In November 2001, the Board of Directors appointed PRAG as the District's Financial
Advisor for a three-year period beginning with fiscal year 2001-02, with an option of
extending the service period for an additional two years upon Board approval. This was
done after staff conducted a competitive selection process for Financial Advisor to
assist with the development of a financial plan for the capital improvement program
through the year 2020, including groundwater replenishment, and for assistance in the
issuance of the $280 million Certificates of Participation, Series 2003 fixed rate debt.
In February 2005, the Board of Directors extended the service contract with PRAG as
the District's financial advisor for an additional two-year period beginning with fiscal year
2004-05. During this time period, PRAG produced an update of the long-term capital
improvement program financing plan, including variable and fixed rate debt capacities,
and assisted in the issuance of$200 million Certificates of Participation, Series 2006
variable rate debt.
During the original competitive selection process, PRAG was deemed to be the most
competent firm to meet the District's financing needs by the Evaluation Team, a team
consisting of the Director of Finance, the Controller and two external professionals.
This finding was based on proposal evaluations and interviews of the four finalists as to
the overall qualifications of each firm, the experience of each firm, quality of each firm's
professional personnel assigned, services and products offered by each firm,
understanding of the District's needs and each firm's proposed solutions, and the
financing approach proposed by each firm.
Staff was pleased with the results provided by PRAG on both the development of the
capital improvement program financial plans and in the assistance provided on the two
COP debt issuances. PRAG's assistance is now needed to evaluate the current market
a�. .m ne snnno.u.m.0 i i.a r...IULK1Tuem 12(c)en.—I wi.o�.eoo
Page 1
conditions and how they may impact the Sanitation District's five outstanding debt
issues. For example, the Sanitation District's debt policy states that we should consider
the refunding of existing debt if the present value savings are at least three percent of
the par amount of the refunding bonds. In addition, staff needs to begin establishing the
financing team that will be necessary for the Sanitation District's next scheduled debt
issuance in FY 2007-08. One of the first steps in moving forward with the next debt
financing will be to update the Sanitation District's long-term capital improvement
financing plan.
PRAG's bond financing fee is being proposed in some cases to match the original FY
2001-02 proposal and, in other cases, the original proposed amount plus inflation. In
addition, PRAG has proposed additional fees for non-transactional financial advisory
services to perform work as directed by the Sanitation District while lowering their
quarterly Swap Report preparation fees by two-thirds from $3,000 to $1,000.
Staff therefore requests that the Committee recommend that the Board of Directors
renew the financial advisory service contract with PRAG and authorize the General
Manager to complete a negotiated agreement for a five-year period beginning with fiscal
year2006-07.
PRIOR COMMITTEE/BOARD ACTIONS
In November 2001, the Board of Directors appointed Public Resources Advisory Group
(PRAG) as the District's Financial Advisor for a three-year period beginning with fiscal
year 2001-02, with an option of extending the service period for an additional two years
upon Board approval.
In February 2004, the Board of Directors extended the contract of Public Resources
Advisory Group (PRAG) to serve as the District's Financial Advisor for an additional two
years beginning with fiscal year 2004-05.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
❑ This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
C`Dm saM Setll,ga\m,oaLLaal$ ,NslTdipviy IN FlInWLK]B 121c1 FYv®I Mnm.Ez
Page 2
ADDITIONAL INFORMATION
Following is PRAG's response to staffs request that they maintain fees at the levels
from our original contract. They have respectively requested the following changes
from the original contract and the justification for setting such requested fees:
1. Fixed Rate New Money fees
a. Previously $75,000 (original contract)
b. PRAG proposes $85,000
c. CPI-U has increased by 14.9% between January 2002 (original contract
was December 2001) to July 2006 (latest CPI-U figure available);
therefore, $75,000 multiplied by the increase in the CPI-U would equal
$86,180.
2. Fixed Rate Refunding fees
a. Refunding fees were not specifically categorized in the original contract
b. PRAG proposes $100,000
c. The effort to conduct a fixed rate refunding is more involved than a new
money fixed rate issuance (arbitrage restrictions, refunding escrow
component, escrow agreement documentation, procurement and working
with an escrow agent and verification agent)
d. We believe the additional $15,000 (over the proposed fixed rate new
money fee) is justifiable due to the additional complexities and required
effort.
3. Variable Rate New Money fees
a. Previously $100,000 (original contract)
b. PRAG proposes no change in fee, even thought the CPI-U has increased
by 14.9%
4. Variable Rate Refunding fees
a. Refunding fees were not specifically categorized in the original contract
b. PRAG proposes $115,000
c. Additional effort for refundings (see 2.c.)
d. We believe the additional $15,000 (over the proposed variable rate new
money fee) is justifiable due to the additional complexities and required
effort.
e. If the previous fee (original contract) of$100,000 for variable rate debt
(although variable refunding debt was not specifically mentioned) was
escalated by the change in CPI-U, the current fee would be $114,906
which rounds to the proposed $115,000
5. Swap Reports
a. Proposed fees for 1992 and 1993 COPs quarterly swap reports reduced to
$1,000 per swap from the current$3,000 fee, or a total reduction from
$6,000 per quarter to $2,000.
b. Proposed fees for any new swap would be $2,000 for each report during
the first year. After the first year, the report fee would reduce to $1,000
per swap.
c mmom .W SWInpWmW l SenmpeRnn�IMMM FIWWW WM 1�c)Fo.
Page 3
Although PRAG's proposed fee structure may seem more complicated than in the
original contract, they believe it more accurately reflects the effort involved in
implementing the various types of potential transactions available to the Sanitation
District. Attached to this report is there specific full and complete fee proposal.
ALTERNATIVES
Direct staff to initiate a new competitive selection process.
CECA FINDINGS
N/A
ATTACHMENTS
1. Letter from Public Resources Advisory Group, dated September 5, 2006.
C'.'A mom9W9eil^YF1moNou15e MZ%Te^ NIM~FlM10lK1ltlYm t$q FNvmItl PGNv .hc
Page 4
Public Resources Advisory Group
I IMS Wert Olympic Boulevmd ■ Suile640 ■ Los MBelm,Celil=ia 90064 • Phone (310)4774487 • Fm(310)477-0105
September 5, 2006
Mr. Michael White
Controller
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708-7018
Dear Mr. White:
Public Resources Advisory Group ("PRAG") is pleased to submit a proposal to extend its service
as financial advisor to the Orange County Sanitation District (the "District"). As financial
advisor, PRAG will continue to provide consulting services in conjunction with the District's
capital funding, debt, swaps, and investment programs. PRAG will provide qualified personnel
for all financial advisory services, including,but not limited to the following:
➢ Making available qualified personnel for consultations and conferences with
staff and officials on an as needed basis;
➢ Maintain and refine the Capital Financing Plan model which projects
components of the District's revenue and expenses, cash reserves, and capital
project expenditures for the collection system and joint treatment works, as well
as repayment obligations for the District's outstanding and projected debt
obligations;
➢ Conduct regular reviews of the District's debt structure and explore refinancing
and restructuring opportunities available in the current market, including
increasing or decreasing variable rate exposure;
➢ Issuance of debt and swaps
• Assist in the selection process of other financing team members,
including underwriters, legal counsel, swap providers, credit
enhancement providers, paying agents, auction agents, trustees, printers,
and verification agents;
• Develop the financing structure with a focus on the benefits and risks to
the District;
• Prepare financing schedules and agendas for meetings of the financing
team;
• Review and provide comments on bond resolutions, offering statements
and other financing documents;
• Devise and implement credit ratings strategies, including arranging to
obtain ratings for debt, preparation of presentations, conducting
C?Dacumenhand Sme1g•Umr•xlLwal Sm81ps1rempmery Imemet 191es101-K78Wem 12(c)Fmind•l Mvum tt t,dac
Public Resources Advisory Group
meetings, arranging tours, responding to inquiries from rating analysts.
and maintaining regular contact with rating analysts;
• Assess the cost effectiveness of credit enhancement options for the
financing;and
is Participate in the pre-closing and closing activities, to assure that a
smooth closing is accomplished;
Perform other financial advisory services as may be required from time to time.
PRAG typically bills clients on an hourly basis for non-transactional work and fixed fees for
transactional work. Our proposed billing rates for non-transactional work is the following:
i�ourly Rates
Person", Raw—Pe—rHour
Chairman/Co-President $350
Executive Vice President/ 300
Senior Managing Director
Managing Director 275
Vice President 250
Assistant Vice President 200
Associate/Analyst 150
For transactional work, we propose the following fees:
Fixed Rate New Money Issuance $85,000
Cora etitiveor Ne otiated)
Fixed Rate Refunding Issuance
(Competitive or Ne otiated) 100,000
Variable Rate New Money Issuance 100,000
Variable Rate Refunding Issuance 115,000
T-apjS 125,000
Swap Reports
Existing Swaps(1992 and 1993 COPS) 1,0001dl
New Swaps(during I"year) 2,000"1
New Swa s(starting 2"d ear) I,000IdI
Bidding of an Investment an
(a) Discounts for simultaneous or close proximity multiple issues(including
swaps and investments)will be negotiated prior to commencing work on
the transactions.
(b) Payable by the counterparty ifthe District rashers.
(c) Not to exceed. Actual fee to be negotiated based on the complexity of
the transaction(i.e. substantial discounting if there is an associated bond
transaction and/or existing swap documents).
(d) For each outstanding swap.
(e) For new investments. not to exceed the amount permitted by the ,safe
harbor" provisions of the federal arbitrage regulations (currenOv
$32.000). For escrow restructurings. 5%of savings an the first million
and 2.5%of incremental savings thercafler.
C V=uments and SeaiagsdereaRocal Settings\Temporary Internet ales\01-R78gtem 12(c)Financial Advisors An t noc -2-
Public Resources Advisory Group
In addition, PRAG will bill the District for out-of-pocket expenses associated with providing
transactional and non-transactional financial advisory services,which are detailed below:
Out-of-Pocket Expenses
Expense Rate
Administrative Fee to-
Computer Charges:
Databases at cost
Munifacts $250 er bond issue
Travel at cos
Automobile:
Rental Cars at cost
Personal Cars $0.445/mile(`)
Other Expenses"' at cost
(a) This fee pennies only to non-personnel expenses which me
billed through PRAG. such as The Bond Buyer, printer, and
disclosure message charges. Any such charges by PRAG will be
disclosed to the District prior to being incurred.
(b) PRAG professionals would endeavor to use the lowest cost
transportation that scheduling permits. Advance notification will
be given to ate District on all travel costs outside of mileage
reimbursmnent.
(c) Or ate current standard mileage rate as determined by the U.S.
Internal Revenue Service.
(d) Must be preapproved by the District's project Manager.
PRAG thanks you for the opportunity over the past few years of providing financial advisory
services to the District. We would very much like to continue serving the District in this
capacity. If the above proposal is acceptable to you, please counter sign below and return a copy
to me at the above address.
Sincerely,
Edmund Soong
Executive Vice President
C,Oocumeas and Seiangs� wox\Local Settings\Temporary laemet FileeWLK78\hem 12(c)Financial ACnsoutAft Idoe -3-
GWR System Steering Committee
October 9,2006
MINUTES
GROUNDWATER REPLENISHMENT SYSTEM STEERING COMMITTEE
STEERING COMMITTEE
(A Committee of Orange County Water District
and Orange County Sanitation District Directors)
OCWD Boardroom, 10500 Ellis Avenue, Fountain Valley
Monday, October 9, 2006, 5:30 p.m.
Committee Members
Philip L. Anthony OCWD Director,Chairman ............. Present
Kathryn Barr OCWD Director ............................... Present
Roger Yoh OCWD Director................................Present
Steve Anderson OCSD Director ................................ Present
Mike Duvall OCSD Director,Vice Chairman....... Present
Carolyn Cavecche OCSD Director ................................ Present
Alternates
Jan Debay OCWD Director(No. 1)....................Present
Denis Bilodeau OCWD Director(No. 2)..............Not Present
Steve Sheldon OCWD Director(No. 3).................... Present
Don Bankhead OCSD Director(No. 1) ..............Not Present
Lary Crandall OCSD Director(No. 2) .................... Present
Doug Daven OCSD Director(No. 3) ..............Not Present
Other Directors Present
Wes Bannister
CONSENT CALENDAR(ITEM NOS.1-2) MOTIONIVOTE AcTioN TAKEN
1. MINUTES OF PREVIOUS MEETING ANTHONY—AYE
RECOMMENDATION:Approve Minutes of the September 11,2006 BARR-AYE APPROVED
Groundwater Replenishment System DEBAY—SECOND,AYE
Steering Committee Meeting as mailed ANDERSON-AYE
DUVALL— MOTION,AYE
CAVEOOHE—AYE
2. CHANGE ORDER NO.2TO RUTAN B TUCKER'S ANTHONY— AYE
PROFESSIONAL SERVICESAGREEMENT FOR GENERAL BARR- SEcoND,AYE DIRECTOR
LEGAL SERVICES RELATING TO THE GWR SYSTEM DEaAY-AYE CAVECCHE ASKED
PROJECTS ANDERSON-AYE THAT BUDGET BE
RECOMMENDATION:Agendize for the October 18 OCWD Board DUVALL—AYE MOVED FROM THE
meeting: Authorize issuance of Change CAVECCHE— MOTION,AYE UNIT II PIPELINE
Order No. 2 to Rutan&Tucker Professional PROJECT TO THIS
Services Agreement in the amount of LINE REM.
$50,000 for the Continuation of general legal APPROVED
services associated with GWR System
projects
_ 1 _
GWR System Steering Committee
October 9, 2006
END OF CONSENT
MATTERS FOR CONSIDERATION
3. AMENDMENT NO. I TO THE FAUBEL PUBLIC AFFAIRS STAFF REQUESTED
PROFESSIONAL SERVICES AGREEMENT TO ADD A KOCE THIS ITEM BE PULLED
SPONSORSHIP AND CHAMBER OF COMMERCE
NEWSLETTER INSERTS FROM TNEAGENOA
RECOMMENDATION: Agend'¢e for the October 18 OCWD and
November 15 OCSD Board meetings.
Authorize the issuance of Amendment No. 1
to the Professional Service Agreement of
Faubel Public Affairs in the amount of
$21,740 in order to enhance the GWR
System outreach using Chamber of
Commerce newsletter inserts and a
sponsorship on Orange County's only TV
station KOCE
INFORMATIONAL ITEMS
4. REPAIR OF CARBON CANYON DIVERSION CHANNEL INFORMATIONAL
5. ADVANCED WATER PURIFICATION FACILITY INFORMATIONAL
COMMISSIONING AND START-UP WORKSHOP
6. ADVANCED WATER PURIFICAITON FACILITY COST INFORMATIONAL
SAVINGS UPDATE
7. PROJECT SCHEDULE AND BUDGET UPDATE INFORMATIONAL
8. CONSTRUCTION PROJECTS PROGRESS INFORMATIONAL
9. MONTHLY CHANGE ORDER UPDATE INFORMATIONAL
10. STATUS REPORT INFORMATIONAL
• Grants and Loans Update
• Public Information and Education Update
DIRECTORS'ANNOUNCEMENTSIREPORTS
GENERAL MANAGERS'ANNOUNCEMENTSI REPORTS
11. ADJOURN TO CLOSED SESSION
• CONFERENCE WITH LEGAL COUNSEL—EXISTING
LITIGATION
[GOVERNMENT CODE SECTION 64868.111 Two(2)
cases:
1)Pac#k Boring, Inc. v. Colich Construction and OCWD—
Superior Court Case 06CCOB950
- 2 -
M 1
GWR System Steering Committee
October 9, 2008
2) Golden State Boring v. OCWD—Appellate Court Case
G035795
CONFERENCE WITH LEGAL COUNSEL—POTENTIAL
LITIGATION
[GOVERNMENT CODE SECTION 64956.9(X)] One(1)
case:
1. Damage to OCWD pipeline due to SR-22 construction
RECONVENE IN OPEN SESSION
ADJOURNMENT 7:15 P.M.
- 3 -