HomeMy WebLinkAbout2006-07-19 ORANGE COUNTY SANITATION DISTRICT
July 12, 2006
pager:
I7141 Bfi22411 NOTICE OF MEETING
p141862d3565fi
www.acid.eam
.111.0 BOARD OF DIRECTORS
R add.:
Fo teln Valley.CA ORANGE COUNTY SANITATION DISTRICT
92728-8127
1G844 Ellie Am,ue
leoYO92708-70 s WEDNESDAY, July 19. 2006 - 7:00 P.M.
Mem4ar
agenci
es
DISTRICT'S ADMINISTRATIVE OFFICES
Cities 10844 Ellis Avenue
Fountain Valley, California 92708
Anaheim
Bras
Buena Park
Gyp.
Fountain Valley
Fullerton The Regular Meeting of the Board of Directors of the Orange County Sanitation
Garden Grove
Huntington eeaoh District will be held at the above location, time and date.
Irmo
La Habra
Le Palma
Les Alamitos
Newport Beechr
Grange
Plaoands BoAtd Secret ry
Sane Ana
seal Beach
Stanton
Tustin
Villa Perk
Vorba Linda OUTS COMMITTEE -DARK
County at orange
PDC COMMITTEE -Thursday,August 3,2006 at 5:00 p.m.
Minister, Districts
LEGISLATIVE AFFAIRS -Tuesday,August B, 2006 at 8:00 a.m.
Costa Mesa
Mlmvay,cry GWR SYSTEM STEERING COMMITTEE - Monday,August 14,2006 at 5:30 p.m.QOCWD
Water Districts
Irvine Ranch FAHR COMMITTEE - DARK
STEERING COMMITTEE -Wednesday,August 23,2006 at 5:00 p.m.
To maintain world-class leadership in wastewater and water resource management.
a
Cq
BOARD MEETING DATES
August 23, 2006
September 27, 2006
October 25, 2006
*November 15, 2006
*December 20, 2006
January 24, 2007
February 28, 2007
March 28, 2007
April 25, 2007
May 23, 2007
June 27, 2007
*July 18, 2007
*Meetings are being held on the third Wednesday of the month
H.%depMA ubllc ARa1rsU20\B5Wgenda\2006 Meebng Nobm\MN07.2.dm
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE &TIME: 07/19/06- 7:00 p.m.
(SIMONIAN) .....................ANDERSON................... —
(SHANKS) ........................ANTOS .........................�� r —
(WILSON) ........................BANKHEAD...................
� ✓ —
(VACANT).........................CAVECCHE...................
i d 19xl:Sa_o�
(GARCIA)..........................CHRISTY..................... �L —
(COLLINS)........................CRANDALL................... �L —
(ROSEN)..........................:9hL-F6N....................... _
—
(KAWASHIMA).................. DAVERT...................... �L R/db1 � 33y— —
(WINDER).........................DUVALL...................... —
(UNDERHILL)...................ECKENRODE................. cz� a— —
(SCHAFER) ......................FERRYMAN...................
—� —
(FAUTEUX).......................FRESCHI .............. .....
(CHOI)...............................KANG.......................... .
(SONDHI)..........................LUEBBEN.....................
(DOW)...............................MARSHALL.................. —
(REINHART) .....................MILLER .........................
—
(BEAUMAN)......................MOORE........................ i —
(KIRKPATRICK-PILGER) .NEUGEBAUER.............. ✓ —
(DRISCOLL).....................:RYA...................... —
(WEBB) ............................ft+f50&h*Y...................
(DONAHUE) .....................SHAWVER.................. �� f —
(HERNANDEZ).................SIDHU..........................
(CORREA) ........................SILVA........................... ✓ i —
(COOK) ............................SULLIVAN...................... cz� cam- —
(RODRIGUEZ)..................WALDMAN.................... �G
STAFF:Arhontes
Colson ✓
Ghirelli �I` ✓ "d � d ,`�
Kovac ✓ Yam'".
Kyle ✓
Ludwin
Miles
Ruth
Tomko
Tyner
OTHERS:
Ho in ✓
06/28/06
H:\deptUdmin\BS\DIRECTOR\DImetora Roll Call.doc
MINUTES OF THE REGULAR JOINT MEETING OF THE
FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE & STEERING COMMITTEE
Orange County Sanitation District
Wednesday, July 12, 2006, 5:00 p.m.
A joint meeting of the Finance, Administration and Human Resources Committee and the
Steering Committee of the Orange County Sanitation District was held on July 12, 2006. at
5:00 p.m., in the Sanitation District's Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
FAHR COMMITTEE MEMBERS: STAFF PRESENT:
DIRECTORS PRESENT: Jim Ruth, Interim General Manager
Darryl Miller, Chair Lisa Tomko, Director of Human Resources
Mike Duvall, Vice Chair Lorenzo Tyner, Director of Finance
Bill Dalton Jeff Reed, Human Resources Manager
Rich Freschi Mike White, Controller
Phil Luebben Lille Kovac, Committee Secretary
Joy Neugebauer Marc Dubois, Contract& Purchasing Manager
Mark Waldman Paul Loehr, Human Resources Supervisor
Doug Davert, Board Vice Chair
OTHERS PRESENT:
Brad Hogin, General Counsel
DIRECTORS ABSENT: Dave Kendig, General Counsel
Jim Ferryman, Board Chair Don McLean, Driver Alliant
James W. Silva Juanita Skillman
Ryal Wheeler
Norbert Gala
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Chair Miller directed the attention to the actuarial proposal letter from a benefits consultant,
Bartel Associates, L.L.C., was distributed by the General Manager,who may assign the
consulting contract within the General Manager's delegation of authority. Chair Miller also
reported that the internal auditors were given a scope of work for the internal audit.
istributed at
y c Board Meeting
Minutes of the Regular Joint meeting of the Finance,Administration and Human
Resources Committee and Steering Committee Meeting
July 12.2006
Page 2
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, indicated that the Bartel proposal would be discussed in detail
during the closed session.
(6) REPORT OF DIRECTOR OF FINANCE/TREASURER
Lorenzo Tyner, Director of Finance, reported that state's budget restores approximately$18
million property tax revenue, returning the Sanitation District to its previous level.
(7) REPORT OF DIRECTOR OF HUMAN RESOURCES/PUBLIC INFORMATION OFFICE
Lisa Tomko, Director of Human Resources, had no report.
(8) REPORT OF GENERAL COUNSEL
Brad Hogin, General Counsel, had no report.
(9) CONSENT CALENDAR ITEMS
a. Approve minutes of the June 14,2006 and June 15, 2006 joint meetings of the Finance,
Administration and Human Resources Committee and Steering Committee regular
meeting, and Benefits Workshop special meeting.
b. FAHRO6-51 Receive and file Employment Status Report as of June 23, 2006.
C. Item pulled for discussion.
d. Item pulled for discussion.
Motion: It was moved, seconded and duly carried to approve the recommended
action for the item specified as 9(a)and 9(b) under consent calendar.
END OF CONSENT CALENDAR
(10) ACTION ITEMS
C. FAHRO6-52 Receive and file OSHA Incidence Rates and Workers' Compensation
Claims and Costs Report.
Lisa Tomko, Director of Human Resources, briefly presented the report to
the committee;the discussion inquired about the reserve funds for cases
that have not been settled. Staff will prepare a report and present it at the
September FAHR meeting that will include discussion regarding reserves,
how the funds are being invested, and open cases.
Motion: It was moved, seconded and duly carried to receive and file.
Minutes of the Regular Joint meeting of the Finance,Administration and Human
Resources Committee and Steering Committee Meeting
July 12, 2006
Page 3
d. FAHRO6-53 Recommend to the Board of Directors to adopt Resolution No. OCSD 06-
XX,Authorizing the District's Treasurer to Invest and/or Reinvest District's
Funds;Adopting District's Investment Policy Statement and Performance
Benchmarks for FY 2006-07; and Repealing Resolution No.OCSD 05-21.
Lorenzo Tyner, Director of Finance, reported to the Committee the
purpose of the resolution was designed to delegate staff to perform
routine investing activities within the state-mandated guidelines. It was
also reported that PIMCO, the investment management consultant,will be
presenting investment strategies to the FAHR Committee for
consideration and approval by the Board of Directors in October 2006.
MOTION: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
(11) INFORMATIONAL ITEMS
a. FAHRO6-54 Insurance level criteria and indemnification.
Marc Dubois, Contract& Purchasing Manager and General Counsel,
Dave Kendig presented various insurance requirement scenarios
anticipated based on current contract possibilities, in order to evaluate the
exposure to the District,yet maintain the requests of bidders reasonable
and viable.
b. FAHRO6-55 Insurance Renewal Process.
Mike White, Controller, and Don MacLean of Driver Alliant Insurance
Broker presented a timeline for next years'insurance premium request
process.
C. FAHRO6-56 Actuarial valuation of the retiree paid medical premium benefit plan and
the additional retirement benefit account(AREA).
Mike White, Controller, presented to the committee a summary of a
valuation study conducted by Demsey, Filliger and Associates, and the
recommended funding levels for the retirement benefit account.
Recommendations of alternate funding schedules will be presented at the
next FAHR meeting in September.
(12) CLOSED SESSION
The Committee convened in Closed Session at 6:25 p.m. pursuant to Government Code Section
54957.6 to: (1)Confer with designated representatives Lisa Tomko, Director of Human
Resources;Jeff Reed, Human Resources Manager;and Paul Loehr, Human Resources
Supervisor, re Meet and Confer Update re contract negotiations for employees represented by
1). Orange County Employees Association; 2). International Union of Operating Engineers,
Local 501, and 3). Supervisors, Professional Management Team (part of Peace Officers Council
Minutes of the Regular Joint meeting of the Finance,Administration and Human
Resources Committee and Steering Committee Meeting
July 12, 2006
Page 4
of Califomia), Government Code Section 54957.6; and (2) Confer re appointment of Assistant
General Manager, Government Code 54957(B)(1). Confidential Minutes of the Closed Session
held by the Finance,Administration and Human Resources Committee have been prepared in
accordance with California Government Code Section 54957.2, and are maintained by the Board
Secretary in the Official Book of Confidential Minutes of Board and Committee Closed Meetings.
No reportable actions were taken re Agenda Item No. 12(a)(1)and (2).
(13) OTHER BUSINESS. COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
There were none.
(14) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
(15) CONSIDERATION OF UPCOMING MEETINGS
The next regular FAHR Committee meeting is scheduled for September 13, 2006, at 5:00 p.m.
(16) ADJOURNMENT
The Chair declared the meeting adjourned at 7:20 p.m.
Submitted by:
Lilia I ovac
Committee Secretary
H:Wap0eganda\FAHR\FAHR2006\07061071205 FAHR Minutss.doc
July 17, 2006 a
MEMORANDDM
p
TO: Chair and Members of Board of Directors
Orange County Sanitation District
FROM: James Auth
Interim General Manager, Orange County Sanitation District
SUBJECT: July Status Report
1. Benefits Consultant
Proposal from actuarial consultant, John Bartel,was received and his work on exploring
benefit options designed to contain costs and reduce long term District financial liability
has started. Mr. Bartel will work with staff and the FAHR Committee to prepare his work
product which should take approximately 6-8 weeks.
2. Appointment of AGM
In accordance with the Steering and FAHR Committees review and approval, I will be
appointing an Acting Assistant General Manager effective July 20, 2006. The Steering
Committee will revisit this appointment in 90-120 days to determine if we should conduct
an open competitive recruitment for a permanent appointment to this position. The
Board previously approved the creation of this position in our 2006-07 Budget.
3. Management Training Program
"Profession of Management"will begin in September and provide 40 hours of training for
our administrative managers which will focus on the basic fundamentals of management.
The training program will be provided by Louis Allen Worldwide,with facilitator Ray
Burch and will begin on September 14, 20, 21, October 18, and December 7, 2006.
4. Joint Campus Study
OCSD and OCW D staff has reviewed initial draft documents from our consultants
relating to risk, traffic, and safety issues and have requested a more detailed analysis
with recommendations from the consultants. Final reports are anticipated by August 30.
5. Information Technology(IT) Review
The IT assessment has been completed, an action plan to address operational and
management issues has been prepared and will be implemented August 1, 2006. The IT
Strategic Plan RFP has been completed and the department is now receiving proposals.
A survey of all operating departments to receive feedback on the department's
performance and quality of services has been sent out and results are being reviewed.
Distributed at
�� _ - " Board Meeting
Board of Directors
Page 2
July 19, 2006
6. Independent Reviews
RFPs for independent reviews of our Capital Improvement Program (CIP), Operations
and Maintenance (0&M), and Regional Assets and Services (RAS)operations were
prepared by staff at the direction of the FAHR Committee.
These RFPs, along with their estimated costs, were presented to the Steering Committee
and the PDC Committee. It was determined the costs were excessive in relation to the
potential benefits. Staff will address these studies internally and, if specific expertise in a
given area of study is required,we will come back to the Board. Engineering will proceed
With a peer review conducted by the American Society of Civil Engineers (ASCE)at a
minimal cost of$20,000 to look at management and business practices and how we
compare with the industry.
7. Performance Reviews
Evaluations of the department heads by the General Manager will be completed by July
21 under the new Performance Evaluation System.
The Steering Committee and Board have received the new format and process under
which the future General Manager will be reviewed.
8. EMT Retreat
The General Manager and the EMT will conduct a retreat on August 16 and possibly a
half day on August 17 to review our goals and objectives for the year, make sure they are
in alignment with the Board's direction and policies. A copy of our agenda is attached.
The retreat will be held at the Huntington Beach Library.
9. Labor Management Meeting
The next Labor Management Committee will be held on July 18. 1 intend to initiate
preliminary discussions with our various labor units in an effort to help each other
understand the labor environment and general expectations,and to see if we can
mutually agree to moving forward with formal negotiations.
10. Organizational and Operational Reviews—Support Services
I am in the process of soliciting proposals from qualified firms to conduct organizational
and operational review of our administrative functions (Finance, Human Resources,
Information Technology), such review will assist in finalizing a proposed reorganization
plan.
11. All Hands Meeting
An All Hands meeting with District employees was held on July 11. Board Chair Jim
Ferryman presented opening remarks. The General Manager gave a State of the District
address, and the EMT outlined the ten initiatives that represent major Board policy
directives.
JDR:gg
HMeptladm1W t01RUTH JPMEMWtus Reports M6071908 JOR Sletus MPH memo 0 ROaMAW
ORANGE COUNTY SANITATION DISTRICT
Date: July 13, 2006
gh... To The Chair and Board of Directors
(714)982-2411 Orange County Sanitation District
Mal
(7141962d355
www.ena.mm From: James D. Ruth
Interim General Manager
PO, 8.8127 Subject:j Board Letter
Fn rcain Venn,.CA
92728.8127
aernnt.adrenal
108"elie Avenue OCSD Receives NACWA Silver Award
°n 92708av,CA
Orange Count Sanitation District OCSD was resented with the NACWA Silver
ea)GeaoCA 9 Y (OCSD) P
Award in recognition of excellent record of permit compliance. Silver Awards are
Member presented to NACWA member agency facilities that have less than five NPDES
A,.el.s violations over the course of the calendar year. OCSD had one violation of its ocean
• discharge permit in 2005 for the chemical dioxin. NACWA—the National Association
cities of Clean Water Agencies—is a trade organizatidn that represents the interests of
over 300 public wastewater agencies in Washington, D.C. in the development of
Anaheim eras environmental legislation and works closely with`ede;al regulatory agencies in the
Banns Perk implementation of environmental programs. -
Lyprees
Fountain .rtay
Fallarmn Federal Funding Update
Garden G . In Mid-June, Chair Anderson (along with Wes Bannister and Virginia Grebbien from
Handngtdn Beech
lrrma the Orange County Water District)traveled to Washington, D.C. to lobby the
Le Hebre delegation for priority projects. Chair Anderson met with every member of the
La Palma Las Alamitos delegation, including Senator Feinstein (Senator Boxer was unavailable) and was
Newport Beach able to discuss OCSD's appropriation requests. Following the successful meetings,
orange Senator Feinstein was able to secure fundingfor the District priorities:
Plateau.
Banta An
Beal Beach . Increasing the Groundwater Replenishment System (GWRS) from $1.23
stanron
r a.n million to $2.5 million and
Villa Park . Increasing the authorization for the Santa Ana River Maintem Project (Prado
lbrba Linda Dam) by $100 million, from $1.8 to $1.9 billion to relocate the Santa Ana
canner e1 orange River Interceptor line (SARI).
Sanitary Districts Unfortunately, because of tight funding and reductions in the State and Tribal
cn.ta Me" Assistance Grants (STAG), OCSO was not successful in securing Federal funds to
Midway City help pay for full secondary treatment costs. The US Environmental Protection
Water Dlstrlet. Agency is funded through the STAG account, which is usually heavily tapped for
earmarks. As such, it is often difficult to secure funds through this account. At this
Irvine Rensh time, the STAG account is the only one available through which to seek secondary
treatment dollars.
OCSD Staff and its lobbying team will continue to pursue funding alternatives for
secondary treatment
Tc,meintarn world-class leadership in weetewatar and water resource management.
Board of Directors
Page 2
July 13, 2006
Bushard Trunk Sewer Replacement Project
The Orange County Sanitation District(OCSD) has completed the first segment of its
Bushard Trunk Sewer Replacement Project, from Panacea Drive to Atlanta Avenue.
The closure, which began in March 2006,was completed one month ahead of
schedule and is part of a sewer replacement project that will provide additional
sewage capacity for the growing communities.
Construction closures continue on Bushard Street in the segments from Atlanta
Avenue to Indianapolis Avenue through early fall 2006 and Indianapolis Avenue to
Adams through winter 2006.
"We are extremely pleased to have completed the first segment one month ahead of
schedule, which has lessened the impacts to the residents adjacent to the
construction," said David Ludwin, Orange County Sanitation District Director of
Engineering.
The Bushard Trunk is a major sewer line that serves the cities of Fountain Valley,
Westminster, Garden Grove, Stanton, Fullerton and Buena Park. The new pipeline
extends from OCSD's main entrance at Plant No. 2 along Brookhurst Street, Banning
Avenue and Bushard Street in Huntington Beach, approximately four miles to the
intersection of Ellis Avenue and Bushard Street in Fountain Valley. The entire project
is scheduled to be completed by summer 2007.
For further information about Bushard Trunk Sewer Replacement Project, please call
Jennifer Cabral at (714) 593-7581. For updates about the project's progress, please
call the construction hotline at(714) 378-2965 or visit the OCSD Web site at
www.ocsd.com.
s. Z-W,
James D. Ruth
Interim General Manager
JDR:gg
H:10EP DMIMOMIBOMDLMERV0BA0>1305BOMDLTR.DOC
ORANGE COUNTY SANITATION DISTRICT
Date: July 13, 2006
.Hens: To The Chair and Board of Directors
n141 9 62-2411 Orange County Sanitation District
rail:
17141 9620356
www.eua.wm From: James D. Ruth
Interim General Manager
mining eammae:
90. B.e127 Poun Valley 0A Subject, Board Letter
92]28-912]
ae.addreea:
1 M44 Ellia Avenue OCSD Receives NACWA Silver Award
�"nt9270B-7 cA Orange Count Sanitation District OCSD was resented with the NACWA Silver
92]OB-]019 9 y (OCSD) P
Award in recognition of excellent record of permit compliance. Silver Awards are
gg.mn.r presented to NACWA member agency facilities that have less than five NPDES
Agencies violations over the course of the calendar year. OCSD had one violation of its ocean
• discharge permit in 2005 for the chemical dioxin. NACWA—the National Association
tine, of Clean Water Agencies—is a trade organizatidn that represents the interests of
Anahe;m over 300 public wastewater agencies in Washington, D.C. in the development of
area environmental legislation and works closely with`ede;al regulatory agencies in the
Buana Park implementation of environmental programs.
0'ra
Fountain Valley
Fullerten Federal Funding Update
caroen Gnin, In Mid-June, Chair Anderson (along with Wes Bannister and Virginia Grebbien from
Huwngron Beach
Irma the Orange County Water District)traveled to Washington, D.C. to lobby the
La Habra delegation for priority projects. Chair Anderson met with every member of the
La Palma delegation, including Senator Feinstein Senator Boxer was unavailable and was
Los Alamitos 9 9 ( )
Ah egart Beach able to discuss OCSD's appropriation requests. Following the successful meetings,
orange Senator Feinstein was able to secure fundingfor the District priorities:
Rlorange
Sente Ana
Seat Beach a Increasing the Groundwater Replenishment System (GWRS)from $1.23
Btanron
rusnn million to $2.5 million and
Villa Park . Increasing the authorization for the Santa Ana River Maintem Project (Prado
rarba Linda Dam) by $100 million, from $1.8 to $1.9 billion to relocate the Santa Ana
Deenq at Dren, River Interceptor line (SARI).
Sil Dlatriate Unfortunately, because of tight funding and reductions in the State and Tribal
G,eita Mesa Assistance Grants (STAG), OCSD was not successful in securing Federal funds to
Mlamay rty help pay for full secondary treatment costs. The US Environmental Protection
water Dlse,ncee Agency is funded through the STAG account, which is usually heavily tapped for
earmarks. As such, it is often difficult to secure funds through this account. At this
Irvine Ranch time, the STAG account is the only one available through which to seek secondary
treatment dollars.
OCSD Staff and its lobbying team will continue to pursue funding alternatives for
secondary treatment
\ Ri maintain worlbchlaa leadership m waata.ta,and water reamrce management.
Board of Directors
Page 2
July 13, 2006
Bushard Trunk Sewer Replacement Project
The Orange County Sanitation District(OCSD) has completed the first segment of its
Bushard Trunk Sewer Replacement Project, from Panacea Drive to Atlanta Avenue.
The closure, which began in March 2006,was completed one month ahead of
schedule and is part of a sewer replacement project that will provide additional
sewage capacity for the growing communities.
Construction closures continue on Bushard Street in the segments from Atlanta
Avenue to Indianapolis Avenue through early fall 2006 and Indianapolis Avenue to
Adams through winter 2006.
'We are extremely pleased to have completed the first segment one month ahead of
schedule, which has lessened the impacts to the residents adjacent to the
construction;'said David Ludwin, Orange County Sanitation District Director of
Engineering.
The Bushard Trunk is a major sewer line that serves the cities of Fountain Valley,
Westminster, Garden Grove, Stanton, Fullerton and Buena Park. The new pipeline
extends from OCSD's main entrance at Plant No. 2 along Brookhurst Street, Banning
Avenue and Bushard Street in Huntington Beach, approximately four miles to the
intersection of Ellis Avenue and Bushard Street in Fountain Valley. The entire project
is scheduled to be completed by summer 2007.
For further information about Bushard Trunk Sewer Replacement Project, please call
Jennifer Cabral at (714) 593-7581. For updates about the project's progress, please
call the construction hotline at (714) 378-2965 or visit the OCSD Web site at
www.ocsd.com.
Jaames D. Ruth
Interim General Manager
JDR:gg
x"riuomwimn DLenenaoar IMe Dimnoc
AGENDA
~ BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
July 19, 2006— 7:00 P.M.
1. Invocation and Pledge of Allegiance
2. Roll Call
3. Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, if any.
4. Appointment of Chair pro tem, if necessary
5. Public Comments
6. The Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors.
a. Report of Chair; consideration of Resolutions or recommendations, presentations
and awards
b. Report of General Manager
C. Report of General Counsel
7. If no corrections or amendments are made, the minutes for the regular meeting held on
June 28, 2006,will be deemed approved as mailed and be so ordered by the Chair.
8. Ratifying payment of claims of the District, by roll call vote, as follows:
ALL DISTRICTS 06/15/06 06/31/06
Totals $6,974,897.18 $26,407,937.92
DIRECTORS: Pursuant to Government Code Section 84308, you are required to disclose
any campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving OCSD. This requires that you identify the contributor by name.
Further, you may not participate in the decision making process to award a contract to such
party. For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with OCSD. For the specks of Government Code Section 84308,
please see your Director's Handbook or call the office of General Counsel.
07/19/06
Page 2
CONSENT CALENDAR
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
(a) Receive and file Summons and Complaint re Christopher Spencer v. Orange
County Sanitation District, et al., Orange County Superior Court Case
No. 06CC05848, in connection with Rehabilitation of le Street Pump Station,
Contract No. 5-51, and Rehabilitation of"A" Street Pump Station, Contract
No. 5-52, and authorize General Counsel to appear and defend the interests of
the District.
END OF CONSENT CALENDAR
10. Consideration of items deleted from Consent Calendar, if any.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE
Consent Calendar
a. Order draft Steering Committee Minutes for the meeting held on June 28, 2006,
to be filed.
Non-Consent Calendar
b. Approve the performance appraisal and evaluation program for the General
Manager.
C. Consideration of items deleted from Steering Committee Consent Calendar, if
any
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
OMTS Consent Calendar
a. Order draft Operations, Maintenance and Technical Services Committee Minutes
for the meeting held on July 5, 2006 to be filed.
OMTS Non-Consent Calendar
b. Consideration of items deleted from OMTS Consent Calendar, 9 any.
07/19/06
,Y Page 3
13. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. Order draft Planning, Design and Construction Committee Minutes for the regular
meeting held on July 6 2006, to be filed.
b. Ratify Change Order No. 9 to Secondary Treatment Facilities Process Upgrades
at Plant No. 2, Job No. P2417-3, with Morrow-Meadows Corporation, authorizing
an addition of$82,199, and 100 calendar days, increasing the total contract
amount to $7,344,607.
C. (1) Ratify Change Order No. 3 to Santa Ana River Interceptor, 2005 Emergency
Repairs from 10,000 CFS Release, Contract No. 2411 AB, with Ken Thompson,
Inc., authorizing an addition of$15,700 and 50 calendar days, increasing the
total contract amount to$1,446,273.; and,
(2)Accept Santa Ana River Interceptor, 2006 Emergency Repairs from 10,000
CFS Release, Contract No. 2-41-4B, as complete, authorizing execution of the
Notice of Completion and approving the Final Close Out Agreement.
d. Ratify Change Order No. 9 to Gisler-Redhill Trunk Improvements, Reach W,
Contract No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-
Redhill/North Trunk Improvements, Contract No. 7-41; and City of Tustin Project
Nos. 6106 and 6151, with ARB, Inc., authorizing an addition of$643,271,
increasing the total contract amount to $21,534,951.
e. Ratify Change Order No. 1 to Activated Sludge Plant Rehabilitation at Plant
No. 1, Job No. P1-62, with J. R. Filanc Construction Company, Inc., authorizing
an addition of$149,078 and a time extension of 101 calendar days, increasing
the total contract amount to $32,342,078.
f. Approve Amendment No. 2 to the Professional Services Agreement with Brown
and Caldwell to provide additional design services for Trickling Filters at Plant
No. 2, Job No. P2-90, for an additional amount of$397,680, increasing the total
amount not to exceed $10,083,220.
g. Approve Amendment No. 3 to the Service Contract with NRG Thermal Services,
LLC, providing for additional field services for Air Quality Improvements, Job
No. J-79,for an additional amount of$90,483, increasing the total not to exceed
amount to $2,338,437.
h. Approve Amendment No. 1 to the Professional Services Agreement with Earth
Tech, Inc. for Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, providing for
the additional construction management services, for an additional amount of
$476,693, increasing the total amount not to exceed $2,531.286.
i. Approve Amendment No. 8 to the Professional Services Agreement with Brown
and Caldwell, providing for additional engineering services for Primary Clarifiers
16-31 and Related Facilities, Job No. P1-37, for an additional amount of
$588,575, increasing the total amount not to exceed $6,787,436.
07/1 9/06
Page 4
J. Approve Amendment No. 1 to the Conveyance, Disassembly and Abandonment
Agreement with the International Bay Clubs, Inc. regarding the existing Rocky
Point Pump Station, Contract No. 5-50, extending the abandonment deadline by
three years.
k. Approve grant funding for the following Cooperative Projects: (1) $300,000 for
Garden Grove Sanitary District for Closed Circuit Television (CCTV) inspection
and sewer condition assessment; and (2) $325,000 for the City of Cypress for
CCTV inspection and sewer condition assessment, for a total of$625,000.
I. Ratify use of the General Manager's emergency purchasing authority, Resolution
No. OCSD 99-23, for Purchase Order Nos. 50018-OS, 52747-OS, 53411-OS,
and 55070-OS issued to Frost Company for a total amount not to exceed
$224,000 for emergency repairs to the critical process equipment installed in the
Solids Storage and Truck Loading Facility, Job No. P2-60.
M. Ratify Change Order No. 19 to Bushard Trunk Sewer Rehabilitation, Job
No. 1-2-4, with Steve P. Rados, Inc., authorizing a credit of$4,358,204,
decreasing the total contract amount to$30,528,502.
PDC Non-Consent Calendar
n. Consideration of items deleted from PDC Consent Calendar, If any.
14. FINANCE, ADMINISTRATION AND HUMAN RESOURCES COMMITTEE
FAHR Consent Calendar
a. Order draft Finance,Administration and Human Resources Committee Minutes
for the Benefits Workshop held on June 15, 2006, and the regular meeting held
July 12, 2006, to be filed. (Minutes for 07/12106 to be distributed at 07119106
Board Meeting.)
b. Recommend to the Board of Directors to adopt Resolution No. OCSD 06-17,
Authorizing the District's Treasurer to Invest and/or Reinvest District's Funds;
Adopting District's Investment Policy Statement and Performance Benchmarks
for FY 2006-07; and Repealing Resolution No. OCSD 05-21.
FAHR Non-Consent Calendar
C. Consideration of items deleted from FAHR Consent Calendar, if any.
15. LEGISLATIVE AFFAIRS COMMITTEE
Legislative Affairs Consent Calendar
a. Order Legislative Affairs Committee Minutes for the meeting held on July 11,
2006 to be filed.
Legislative Affairs Non-Consent Calendar
b. Consideration of items deleted from FAHR Consent Calendar, if any.
07/19/06
Page 5
16. GWR SYSTEM STEERING COMMITTEE (GWRSSC)
GWRSSC Consent Calendar
a. Order Joint Groundwater Replenishment System Steering Committee Minutes for
the meeting held on June 12, 2006,to be filed.
GWRSSC Non-Consent Calendar
b. Consideration of items deleted from GWRSSC Consent Calendar, if any.
NON-CONSENT CALENDAR
17. Approve a contract with Platinum Advisors at$5,000 per month for a nine-month period
from April 1, 2006 through December 31, 2006 for Legislative Advocacy Services and
the option to renew for an additional one-year period at the discretion of the Steering
Committee and return to the Board of Directors for approval.
18. Approve an agreement with the Irvine Community Development Company to retain and
pay engineering and environmental consultants for an amount not to exceed $200,000 to
provide engineering services relating to the SARI line shallow profile alternative study
and Mountain Park Sewer Line Connection, in a form approved by General Counsel.
19. Closed Session
CLOSED SESSION: During the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations, pending or
potential litigation, or personnel matters, pursuant to Government Code Sections
54956.8, 54956.9, 54957 or 54957.6, as noted.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives; or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted closed
session and are not available for public inspection. At such time as the Board takes
final action on any of these subjects, the minutes will reflect all required disclosures
of information.
a. Convene in closed session, if necessary
1. Confer re appointment of Assistant General Manager. Government Code
Section 54957(B)(1).
2. Confer with General Counsel -Anticipated Litigation. Significant
Exposure to Litigation [Government Code Section 54956.9(b)]: One case.
3. Confer with General Counsel—Anticipated Litigation
Possible initiation of litigation [Government Code Section 54956.9(c)]:
One case.
07/19/06
Page 6
b. Reconvene in regular session
c. Consideration of action, if any, on matters considered in closed session
20. Matters which a Director may wish to place on a future agenda for action and
staff report.
21. Other business and communications or supplemental agenda items, 'If any
22. Future Meeting Date: The next Board of Directors regular meeting is scheduled for
August 23, 2006, at 7:00 p.m.
23. Adjournment
Agenda Posting: In accordance wth the requirements of California Government Code Section 54954.2,this
agenda has been posted in the main lobby of the District's Administrative offices not less than 72 hours prior
to the meeting date and time above. All written materials relating to each agenda item are available for public
inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to the Board
for discussion and/or action,it will be done in compliance with Section 54954.2(b)as an emergency item or
because there is a need to take immediate action,which need came to the attention of the Board subsequent
to the posting of agenda,or as set forth on a supplemental agenda posted in the manner as above, not less
than 72 hours prior to the meeting date.
Public Comments: Any member of the public may address the Board of Directors on specific agenda items or
matters of general interest. As determined by the Chair,speakers may be deferred until the specific item is
taken for discussion and remarks may be limited to three minutes.
Matters of interest addressed by a member of the public and not listed on this agenda cannot have action
taken by the Board of Directors except as authorized by Section 54954.2(b). If you wish to speak, please
complete a Speaker's Form(located at the table outside of the Board Room)and give it to the Board
Secretary.
Consent Calendar:All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the Consent Calendar by a
Director,staff member or member of the public in attendance,there will be no separate discussion of these
items. All items on the Consent Calendar will be enacted by one action approving all motions,and casting a
unanimous ballot for resolutions included on the consent calendar. All items removed from the Consent
Calendar shall be considered in the regular order of business.
Members of the public who wish to remove an item from the Consent Calendar shall,upon recognition by the
Chair, state their name,address and designate by number the item to be removed from the Consent
Calendar.
The Chair will determine if any items are to be deleted from the Consent Calendar,
Items Continued: Items may be continued from this meeting wthout further notice to a Committee or Board
meeting held within five(5)days of this meeting per Government Code Section 54954.2(b)(3).
Meeting Adioumment: This meeting may be adjourned to a later time and items of business from this agenda
may be considered at the later meeting by Order of Adjournment and Notice in accordance Wth Government
Code Section 54955(posted within 24 hours).
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible. If you
require any special disability related accommodations, please contact the Orange County Sanitation District
Board Secretary's office at(714)593-7130 at least 72 hours prior to the scheduled meeting. Requests must
soecifv the nature of the disablllty and the tvoe of accommodation requested.
07/1 g/OB
-r Page 7
---................................................................................................................................................................................................................................................................................
NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the Board of
!Directors, items shall be submitted to the Board Secretary no later than the close of business 14 days
1preceding the Board meeting. The Board Secretary shall include on the agenda all items submitted by
Directors, the General Manager and General Counsel and all formal communications.
[Interim General Manager James D. Ruth (714)593-7110 iruthaocsd.com
Board Secretary Penny Kyle (714)593-7130 okvlettocsd.com
[Director/Engineering David Ludwin (714)693-7300 dludv in(olomd.com
I Director/FinancefFreasurer Lorenzo Tyner (714)593-7550 Itvnernocsd.com
;Director/Human Resources Lisa Tomko (714)693-7145 Ilomko(almsd.com
i Director/Information Technology Patrick Miles (714)593-7280 omiles0ocsd.com
Director/Operations 8
Maintenance Jim Herberg (714)593-7020 therbergaocsd.com
0irectorrrechnical Services Bob Ghirelli (714)593-7400 rohirelli0ocsd.com
Director/Regional Assets&
! Services Nick Arhontes (714)593-7210 namontes(docsd.com
[GeneralCounsel,,,,,,,,,,,,,,,,,,-........................Bratl Hogin__,,,,,,,,,,,,,,,,,,,,.,,,,,,,--,. bho in wss-law.com
H:WepMgenda\Board Agendas12006 Board Agendas1071006 agenda.doc
B
5
Orange County Sanitation District
MINUTES
BOARD MEETING
June 28, 2006
SAW TgT�oy
Q
9
¢ c
o �
LNG THE
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
1
Minutes for Board Meeting
i Page 2
s 06/28/06
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was held on
June 28, 2006 at 7:00 p.m., in the District's Administrative Offices. Following the Pledge of
Allegiance and invocation the roll was called and the Secretary reported a quorum present as
follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
X Steve Anderson, Chair Steve Simonian
X James M. Ferryman,Vice Chair Adana Schafer
X Charles Antos Gordon Shanks
A Don Bankhead Leland Wilson
X Carolyn Cavecche vacant
X Alberta Christy Mike Garcia
X Larry Crandall John Collins
X Bill Dalton Mark Rosen
X Doug Davert Tony Kawashima
X Michael Duvall Jim Winder
X Norman Ec kenrode Constance Underhill
X Richard Freschi Bob Fauteux
X Sukhee Kang Steven Choi
X Phil Luebben Lydia Sondhi
X Patsy Marshall Jim Dow
X Darryl Miller Douglas Reinhart
X Roy Moore John Beauman
X Joy Neugebauer Vivian Kirkpatrick-Pilger
X Ken Parker Catherine Driscoll
X Tod Ridgeway Don Webb
X David Shawver Brian Donahue
X Harty Sidhu Bob Hernandez
X Jim Silva Lou Correa
X Dave Sullivan Debbie Cook
X Mark Waldman Ralph Rodriguez
STAFF MEMBERS PRESENT: Jim Ruth, Interim General Manager, Penny Kyle, Board
Secretary; Nick Arhontes; Bret Colson; Bob Ghirelli; Jim Herberg; Dave Ludwin; Patrick Miles;
Lorenzo Tyner; Lisa Tomko; Jeff Reed; Michael Gold; Chuck Forman; Paula Zeller; Kelly
Christensen
OTHERS PRESENT: Brad Hogin, General Counsel; Don Hughes; Mark Miller; Guillereco
Garcia; Andrew Dale; Terry Knapper
r
Minutes for Board Meeting
Page 3 e
06/28/06
MOVED, SECONDED AND DULY CARRIED: Receive and file minute excerpts from the
following re appointment of active and alternate Directors, as follows:
City/AQenCY Active Director Alternate Director
Seal Beach Charles Antos Gordon Shanks
PUBLIC COMMENTS
There were no public comments.
REPORT OF THE CHAIR
Steve Anderson, Chair, introduced Michael Gold, Legislative Affairs Liaison.
The Chair then provided an update on his recent trip to Washington, DC. He noted they were
able to meet with the Orange County delegation and Senators Feinstein, Sandberg, Royal, and
Miller. They were briefed on projects the District is seeking funding: GWRS, SARI line and
secondary treatment.
The standing committees for the month of July were reviewed. It was noted that the next Board
of Directors' meeting would be held on July 10 due to a conflict with the League of Cities
conference being held the following week.
Chair Anderson announced that the meeting would adjourn in honor of Alternate Director Steve
Ambriz of the City of Orange who passed away on May 25, 2006.
Bob Ghirelli, Director of Technical Services, recognized Jim Davison for 20 years of
employment with the Sanitation District.
REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, deferred his report to Agenda Item No. 14(g).
REPORT OF THE GENERAL COUNSEL
General Counsel, Brad Hogin, reported on a new law that became effective July 1, 2006, that
prohibits former elected officials from lobbying their former agency for compensation for one year.
This also affects City Managers.
ELECTION OF CHAIR
Brad Hogin, General Counsel, provided clarifications on the nomination and election procedure,
noting that Director Jim Ferryman was nominated as a candidate for the office of Chair of the Orange
County Sanitation District at the May Board meeting. This being the annual meeting fixed by the
Minutes for Board Meeting
Page 4
O6/28/06
Board at which elections are held for the office of Chair of the Orange County Sanitation District, a
motion was made, seconded and duly adopted to close nominations.
There being no other nominations, the vote was polled and the Secretary cast the unanimous ballot
for Director Jim Ferryman as the Chair of the Orange County Sanitation District.
ELECTION OF VICE CHAIR
It was announced that the election of the Vice Chair of the Orange County Sanitation District was in
order. Nominations were then called for the post, whereupon Director Doug Davert was nominated.
There being no other nominations, a motion was made, seconded and duly adopted to close
nominations. A motion was then duly made, seconded and adopted to cast the unanimous ballot for
Director Doug Davert as the Vice Chair of the Orange County Sanitation District.
APPROVAL OF MINUTES
MOVED, SECONDED AND DULY CARRIED: The Chair ordered that the minutes of the regular
meeting held May 24, 2006, be deemed approved.
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and 'B', attached hereto and made a part of these minutes,
ALL DISTRICTS /04 15/06 04/30/06
Totals $14,668,236.33 $32,520,553.31
Director Cavecche abstained from discussion and voting on Warrant Nos. 80988, 81374 and
81807. Director Davert abstained from discussion and voting on Warrant Nos. 80823, 80830,
81050, 81119 and 81804. Director Shawver abstained from discussion and voting on Warrant
Nos. 81804, 81549, 81505, 81373. 81448, 81457, 81242, 81109, 81112, 81115, 81291, 81349,
81371, 80915, 81545, 81594, 81667 and 81701. Abstentions were pursuant to California
Government Code Section 84308.
CONSENT CALENDAR
10. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. OCSD 06-
14, Establishing the Annual Appropriations Limit for Fiscal Year 2006-07,for the
District in accordance with the Provisions of Division 9 of Title 1 of the Caldomia
Government Code.
r
Minutes for Board Meeting
Page 5
O6/28/06
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
12. STEERING COMMITTEE
A verbal report was presented by Chair Anderson re the June 28, 2006 meeting. He
advised the General Manager briefed the Steering Committee on this month's
accomplishments; and David Ludwin, Director of Engineering, and Jim Herberg, Director
of Operations and Maintenance, gave brief updates on the Independent review process
for the CIP program and O&M staffing.
Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Steering Committee
Minutes for the meeting held on May 24, 2006, to be filed.
Non-Consent Calendar
No items were considered.
13. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE
PDC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Planning, Design and
Construction Committee Minutes for the regular meeting held on June 1, 2006, to
be filed, as corrected.
b. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 27
to Primary Clarifiers 16-31 and Related Facilities,Job No. P1-37, with Margate
Construction, authorizing an addition of$314,921, increasing the total contract
amount to $72,676,520.
C. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 1 to
Rehabilitation of the 10 Street Pump Station, Contract No. 5-51, and
Rehabilitation of the"A" Street Pump Station, Contract No. 5-52, with Kiewit
Pacific Company, authorizing an addition of$141,364 and 113 calendar days,
increasing the total contract amount to $11,839,144.
d. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 8 to
Gisler-Redhill Trunk Improvements, Reach"A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk Improvements,
Contract No. 7-41; and City of Tustin Project Nos. 6106 and 6151, with ARB,
Inc., authorizing an addition of$497,394 and nine calendar days, increasing the
total contract amount to$20,891,680.
1
Minutes for Board Meeting
Page 6
O6128/06
e. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 7 to
Trickling Filter Rehabilitation and New Clarifiers, Job No. P1-76, with J.R. Filanc
Construction Company, Inc., authorizing an addition of$281,732, increasing the
total contract amount to$34,991,510.
f. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 13 to
Effluent Pump Station Annex, Job No. J-77, with J.F. Shea Construction, Inc.,
authorizing an additional amount of$65,276 and 50 calendar days, increasing
the total contract amount to$44,597,334.
Director Davert abstained.
g. Item removed by staff.
h. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 1 to
Bushard Trunk Sewer Rehabilitation Pipe Procurement, Job No. I-2-4P, with
Ameron International, authorizing an addition of$184,948 and 15 calendar days,
increasing the total contract amount to$7,884,725.
i. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 2 to
Professional Services Agreements with Berryman& Henigar; Brinderson; HDR
(CGvL) Engineers; Dudek&Associates, Inc.; Jacobson Helgoth Consultants,
Inc.; Lee & Ro, Inc.; RMS Engineering & Design, Inc.; South Coast Systems,
Inc.; SPEC Services, Inc.; and Washington Group International for services
related to Facilities Engineering projects, in amounts not to exceed $200,000 for
each agreement extension for a total amount not to exceed $2.000,000.
Non-Consent Calendar
No items were considered.
14. FINANCE, ADMINSTRATION AND HUMAN RESOURCES COMMITTEE
FAHR Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Finance,
Administration and Human Resources Committee Minutes for the Benefits
Workshop held on May 18, 2006 and the regular meeting held June 14, 2006 to
be filed.
b. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. 06-15,
amending Resolution No. OCSD 98-33, amending Human Resources Policies
and Procedures Manual.
C. MOVED, SECONDED AND DULY CARRIED: Renew the District's Boiler&
Machinery Insurance Program for the period July 1, 2006 to June 30, 2007, in an
amount not to exceed $25,387.
r
Minutes for Board Meeting
Page 7
06/28/06
d. MOVED, SECONDED AND DULY CARRIED: Renew the District's Excess
Workers' Compensation Insurance for the period July 1, 2006 through June 30,
2007, at a rate not to exceed $0.00399 of actual payroll.
e. MOVED, SECONDED AND DULY CARRIED: Renew the District's All-Risk
Property and Flood Insurance Program for the period July 1, 2006 through June
30, 2007, in an amount not to exceed $777,833.
f. MOVED, SECONDED AND DULY CARRIED: Renew the District's Excess
General Liability Insurance Program for the period July 1, 2006 through June 30,
2007, in an amount not to exceed $391,233.
Directors Cavecche requested that the insurance brokerage be put out to bid
before the insurance expires next year.
FAHR Non-Consent Calendar
g. Jim Ruth, Interim General Manager, reported on the Sanitation District's
achievements over the past year comprised of a balanced budget with a 9.8%
rate increase; budget cuts; flat personnel level; CIP cuts; two-year budget plan;
streamlined performance evaluation system; management training program;
succession planning; reorganized and created Assistant General Manager
position for approval; explored current employment trends; identified areas of risk
for focused mitigation efforts; established labor management committee; and
successful ideas implemented resulting in an estimated savings of$10 million.
Department Directors presented the portions of budget for their departments.
MOVED, SECONDED AND DULY CARRIED: Approve FY 2006107 and 2007/08
Proposed Operating, Capital, Debt/COP Service and Self-Insurance Budgets for
FY 2006-07 and 2007-08, as follows:
200"7 2007-08
Net Operations, Maintenance&Working Capital $129,054,210 $135,602,130
Worker's Compensation Self Insurance $526,200 $559,400
General Liability and Property Self-Insurance $1,766,100 $2,055,200
Net Capital Improvement Program $266,088.000 $338,818,000
Debt/COP Service $54,410,000 $65,462,000
Other Requirements $4,499,800 $2,645,300
Total $456,3",310 $546,142,030
15. LEGISLATIVE AFFAIRS COMMITTEE
Legislative Affairs Committee Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Legislative Affairs Committee
Minutes for the meeting held on June 13, 2006 to be filed.
I
Minutes for Board Meeting
Page 8
s 06/28/06
b Legislative Affairs Committee Non-Consent Calendar
No items were considered.
16. GWR SYSTEM STEERING COMMITTEE (GWRSSC)
GWRSSC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Steering Committee Minutes for the meeting held on
May 8, 2006, to be filed.
GWRSSC Non-Consent Calendar
No items were considered.
NON-CONSENT CALENDAR
17. MOVED, SECONDED AND DULY CARRIED: Receive and file Addendum No. 1 to the
Final Subsequent Environmental Impact Report for the Secondary Treatment and Plant
Improvement Project for project modifications to the 66kV Substation at Plant No. 1, Job
No. P1-97, prepared by IPMC/CH2M Hill.
Director Cavecche abstained.
18. MOVED, SECONDED AND DULY CARRIED: (1) Approve Plans and Specifications for
Oil Well Excavation and Reabandonment, Contract No. P2-90A, on file at the office
of the Board Secretary;
(2)Approve Addenda Nos. 1, 2, and 3 to the plans and specifications;
(3) Receive and file bid tabulation and recommendation; and,
(4)Award a construction contract to J.F.Shea, Inc. for Contract No. P2-90A, Oil Well
Excavation and Reabandonment, for an amount not to exceed $250.853.
Director Davert abstained.
19. MOVED, SECONDED AND DULY CARRIED: (1)Approve the Amended and Restated
Job No. 1-2-4 Reimbursement Agreement with the City of Huntington Beach, increasing
the maximum allowable 24 hour period staffing costs from $2,645 to $3,050 but keeping
unchanged the maximum total staffing costs at$238,000, in a form approved by General
Counsel;
r
Minutes for Board Meeting
Page 9
O6/28/06
(2)Approve a Real Property License Agreement with the Fountain Valley School District
and the Huntington Beach Union High School District necessary for the location of a
temporary fire station for the Huntington Beach Fire Department during construction of
Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, in a form approved by General
Counsel; and,
(3) Approve an Indemnification Agreement with the Fountain Valley School District, the
Huntington Beach Union High School District, and the City of Huntington Beach
regarding the temporary fire station located on Fountain Valley School District real
property, in a form approved by General Counsel.
20. MOVED, SECONDED AND DULY CARRIED:Award a contract to CCG Faster Systems,
Inc. for purchase and implementation of a Fleet Management Application, Specification
No.CS-2005-215, in the amount of$114,500 and a contingency amount of$11,450 for a
total amount not to exceed $125,950.
21. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. 06-16, Levying
Assessment Installments In Lieu of the Payment of Sewer System Annexation Fees and
Capital Facilities Capacity Charges Incidental to the Connection of Assessor's Parcel
Nos. 502-353-05, 502-352-06, 502-353-01, 502-361-04, 502-362-06, 502-362-05,
502-362-07, 502-362-09, 502-362-08, and 502-362-11 to the Sewer System.
22. Item removed.
23. MOVED, SECONDED AND DULY CARRIED: Approve an agreement with the Santa
Ana Regional Watershed Project Authority (SAWPA) allowing the purchase of up to four
(4) million gallons per day of Treatment and Disposal Capacity rights at OCSD to be
used for desalter brine discharge,for a total amount of$17,136,120 ($4,284,030/MGD),
in a form approved by General Counsel.
24. Brad Hogin, General Counsel, noted an item needed to be added to closed session
regarding significant exposure to litigation. A settlement offer was presented to the
Sanitation District after posting of the agenda, and there is a need for immediate action
on the offer because the Sanitation District has an interest in resolving quickly, if that is
possible.
MOVED, SECONDED AND DULY CARRIED: Authorize adding Agenda Item
No. 24(a)(4)to the closed session agenda pursuant to Government Code Section
54956.9(b) on the grounds that a settlement offer in a matter involving significant
exposure to litigation was presented to the Sanitation District subsequent to the posting
of the agenda, and there is a need for immediate action.
i
Minutes for Board Meeting
Page 10
06/28/06
CONVENE IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS
54956.8 and 54956.9fb1: The Board convened in dosed session at 8:20 p.m. pursuant to
Government Code Sections 54956.8 and 54956.9(b). Confidential minutes of the
Closed Session held by the Board of Directors have been prepared in accordance with
California Government Code Section 54957.2 and are maintained by the Board
Secretary in the Official Book of Confidential Minutes of Board and Committee Closed
Meetings. A report of action taken will be publicly reported at the time the approved
action becomes final re Agenda Item No. 24(a)(1), (2), (3),and(4).
ADJOURNMENT: The Chair declared the meeting adjourned at 9:02 p.m.
Penny M. Kylls
Secretary to the Board of Directors of
Orange County Sanitation District
H.`dep6agendMBWN Minute %2006 Bo W MinuteM062806 minums.dw
Claims Paid From OWLIOB W OBf18109
Warrant No. Vendor Amount De...loop.
Accounts Payable-WarrerHe
BONS Air Products&Chemicals 3 50,000.00 0&M Agreement Oxy.Gen.Sys.MO 8-8-89
80807 Black&Veatch Corporation 590,029.aS Engineering Services Pt-78,P1-102&J-79-1
Spatial Brown&Caldwell 629,937.31 Pmfesalonal Services P240&CMOM-WDR Program
80W9 Comilo Engineers 119.001.35 Professional Services P248
80810 Colleen¢Air Pollution Control 35823.15 Scrubber Fen Replacement-'T'Scrubber
8081l City of Newport Beech ISSAO2.02 Reimbursement Agreement-OCSD Trunk Sewer Improvements
80812 Cedech Engi.ring 45,822.78 Pumps&Pump Pads&Supplies
B0313 Earth Tech.Inc. 55,789.76 Professional SO Ices P2-79
80814 HOR Engineering,Inc 51,309.65 Professional Servces Pl-82
BOB15 IPMC do Parsons 1,280,014.00 Engineering Services-Integrated ProgramlParecl Management.Temporary Staffing.Mal'I.&Supplies
Boole Nemiron Companies,Inc. 52A73.05 Chemicals
80817 Labwa e.Inc. 23100.00 Lob Egummenl Maintenance&Support
80818 Lee&Flo,Inc. 123,486.52 Professional Services 549,5-51,5-62,P2474)3
aoalg Malcolm Pimie,Inc. 204,341.12 Professional Santana P2.80&11-26
80820 MM Americas,Ica. 52.792.80 Professional Scram P2-74.J-101&Modificalion to Collodion Syslem Model
80821 PimmerAmanca8,Inc 1O7,600.77 Sodium Hypochlodle
80822 Pelydy m,Inc. 32,19141 CaOonic Polymer M0 3.11-92
80823 RSF Consulting 73,017.00 Engiceeri,Services 241&2414
80824 Sean Edginksm p,Inc. 38,380.00 Construction-Manhole Rehabilitation Pnyect&Feist and Refold PVC Pipe Rehabpitsllon Project
80525 Synagrc West,Inc. 332,024.87 Residuals Removal MO 3.29-95
$0826 Tula Ranchadegan Fenno 265,276.77 Residuals Removal M03-20-95
$0627 US Peroxide,L.L.C. 41,126,25 Odor&Corrosion Control Treatment for Coll.Sys.,Hydrogen Peroxide&Ferrous Chloride
$0826 4VaodmB Spndlin&Smart 55.051.96 Legal Services MO 7-26-95
80829 Denboor Engineering&Consmuction 225,414.00 Construction 1`2$8.3
80830 J F Shea Construction.Inc. 2r414.387.01 C.e.1 uction Jd7&P246
80831 J R Fllanc Consimolbn 1,649,800.80 CDnshuctipn Pt-62
80832 Medals Conatruclen,Ina. 317,400.00 Construction Pl-37
W833 Southern Contracting Company 115,360.00 Construction J-334A
80834 LA Chemical 1,152.76 Beech
WS35 Aandena Instruments 1D,281.00 Repair&Mounlerence Services-Coastsl MonBormg Buoy
80836 Abrasive Engineering Tool&Equip. 99.79 Socu paper
W837 Absolute Standards,Inc. 675.00 Lab Paris&Supplies
80838 AcouStandmd 80.70 Lab Paris&Supplies
W839 ADTECH 555.00 Electrical Paris&Supplies
80840 fthmt Technologies,Inc 207.42 Lab Pads&Supplies
80841 AIHce American Industrial Hygiene 10.00 Thinning Registration
80842 Aigas Safely,Inc 3,528.98 Safely Supplies
80843 ANM CanwBnng Enghnars 11,325.00 Pmfesolonal Serves,-Pad-Time Dig Alen Techaeian
ON44 ABMed.Inc. 87.45 Ergonomic Computer Supplies
SM45 Applied Industrial Technology 527.39 Mecdunlaal Paris&Supplies
BONS AT&T Universal Biller Was Telephone Service
BOUT American Telephone&Telegraph Corp. 234.47 Telephone Service
BONS Baker Tanks 560.00 Tank Rental.
ao"g Best Chemical Solutions,L.L.C. 10,858.31 Sodium Bousito&Sodium Hydroxide
80850 Based,Specialtia, 529.09 Baharias
aoa51 Bennett Seamen Lighthouse 1,884.54 (5)PHD Gas Monaas
80852 BeraMa m Fluid Power 68.98 Mechanical Paris&Supplies
$0853 BNI Building News 148.08 Books&Publications
n uepwnaJtOSLmlaV33NP6H4a6u2dme Pas Repedro9aTGum5 Pam Repen-0515w EXHIBITA
,N21ax Page 1 Of 8 wArp]e
Claims Paid From OSMIN6 to 05f151O6
Warrant No. Vendor Amount Description
BOOM Bomemann Pumps,Inc 1.241.28 Pump Parts&Supplies
B0855 BOIach Tacticel 3,005.23 Sefey Supplies
80856 Bmnmeg Pacific,In . 1,3B6.07 Janitorial Supplies
80857 Buses&Aswma .Inc 17,144.00 Professimal Services 7-36&7-39
8DO58 Califomu Recreation Company 2.580.90 Boat Slip Rental Fees for Ocean Mou ibdng Vessel Nerssa
8DB59 California Relocation Serving.Inc. 300.00 Office Files M.i,m,1RelareOw Seances
BOW Cambric,Isotope Labs i.wit.55 Lab Parts&Supplies
BO861 Candela Corocan ion 50.65 Electnrsl Supplies
80862 Cad Nmrsan&Co. 300.00 Insurance Claims Administrator
BONS Chedes P.Crowley Co. 3.78103 Elecbiral Pads&Supplies
BOOM Cirgutarkn8refess Airl'vne 408.03 Wreless Seances
80865 Coast Fire EOuipmwl 1.365.87 Fire Extinguishers
SOON Coast Plumbing 2,060.00 Plumbing Sens
80867 Calumbia Mayeral Services,Inc. 270.00 Anaysis 0f Wastewater,Industrial Waste tyr8 Biosolids
BONS Communications Supply Corp. 113.25 Elecscal Paris&Supplies
BOND CmrrPOCmn ST0.01 DwlDumr Hardware5oflware
W870 COneolidafed Elect DisWbutors,Inc. 1,497.82 Eleascal Pods&Supplies
W871 Consolidated!Reprographics 78.73 Copier Paper
80872 Consumers Pipe&Supply Co. 1,201.16 Plumbing Parts&Supplies
$0873 Cooper Cameron Corporation 871.91 Fibers
80874 CORRPRO Companies,Inc. 2,880.00 Professional Services-Cathodic Protection Survey&Testing-Baker Force Main
B0875 County of Omnge Auditor Commoner 17.50 Encroachment Pewit 7-21
80576 Carry of Omnge Auditor Controller 157.50 Encroachment Permit Tdi
W877 Corey of Orerge Auditor ControOer 70.00 Fscroachment Formal Tab
80BT6 CS-AMSCO 1.005.92 Mechanical Pads&Supplies
80879 CVII Membership 100.00 Membership(Call.knitter Erwironmenl Assoc.)
Boom DOPper Tire Co. 346.87 Truck Tres
80881 Davit's Tree Service 2900.00 Tree Marna.Service
BOB62 Did Mar Analytical 1,206.00 Aneysis of BaoWds
BONS Desad Pumps&Parts,In . 2,269.98 Pump Pads&Supplies
SOON Deaudk Water Consols 1.778.97 Mechanical Pam&Supplies
BONS Dudek&Associates.Inc. MAMBO Prole s.bnal Services P2-68
80896 Dunn Edwards COrparatton 224.32 Paint Supplies
80887 Dwyer lrmlruments,Inc 215.61 Instrument Paris&Sidney,
808M Sachems,Inc 6,100.00 Organ Mwitomg&Ouffall Inspection&Maintenance
80889 ENS Resources,be 10,000.00 Professional Senates-LegisbWm Adwcwe
BOND Erawmamenbl Resource Arvorialion 1,416.58 Lab Parts&Supplies
W891 ESSCO(Engineering Sales Service) 5.9T L6S Pump&Motor
80892 Excel Paving Company 11.090.00 Co srs ction-Replete.Raise.Adjust OCSO's Manholes on PCH
80893 Ferguson Enterprises.Inc. 718.36 VBFM
B0894 First American Real Estate Solutions 450.00 OmLlne Orange County Property Infamudon
80895 Fisher Scientific Company,L.L.C. 9,143.70 Lab Paris&Supplies
60896 Ftomax Products,Inc. 690.36 Mechanical Paris&Supplies
BOW Franklin Cave, 20.42 Office Supplies
W898 GamaB Callahw Company 248.25 Chemicals
W899 GBC(General Binding Carp) 29.87 Office Supplies
$0900 Choate T.Hell 2.330.80 Mohr
80901 Golden State Water Company 73.83 Maur O50
809M Goldensest Window Severe 960.00 G mondArreplrg Services
H:vxptllnlExCELare�IDAaP6RWFTleime von ReymmsoTaaum Pea moan.piss® EXHIBITA
ReCim Page208 wa2006
Claims Paid From OSJ01J08 to 0611810E
Warrant No. Vendor Amount Description
W903 Grainger,Inc 1.322.63 Mechanical&Electrical Pens.Supplies IS Tools
80904 Grayber Electric Company 454.56 Instrument Repair&Maintenance Services-Thermocouple Input
$0905 Great Wbalam Sanitary Supplies 146.28 Janitorial Supplies
$0906 The Gri owdl Company 674.92 Instmment Pens&Supplies
60907 Hooker Equipment Company 117.40 Marc Vehicle,Pane,Reeaia&Service
80908 Hach cio Poison Industries t35.30 Lob Paris&Supplies
80909 Haninglon Induslrlel Plastics.Inc. 4.054.62 Me rantcst Pads&Supplies
80910 Notch&Kirk,Inc 3.328.48 Mechanical Paris&Supplies
80911 HenMl Packard Company 8.380.63 (5)Notebooks
80912 Hi Standard Automotive BOARD Auom.h.Pans&Supplies
80913 HNI Brothers 9.665.72 Chomiids-Door&Cortoai0n Control-Needed Trunkline
80914 11110,Ina 1.981.37 Had..
80916 Home Depot 1AS7.14 Mina Repair&Maintenance Meatlal
B0916 Hooker,Repeif Service 499.96 Unineall aid Raieralipn of Labconco Dishwasher iron Lab Room 231 to 229
80917 Hose Expraas.L.L.0 dba Pinsk Santa 192.97 Hose Supplies
80918 Hub Auto Supply 769.86 Wind.Pens&Supplies
50919 City of Hundngton Beach 13A65.08 Water Use
SOON ICC International Code Council 150.00 Membership
80921 Idexx Laboratories,Inc. 2,004.15 Lab Pens&Supplies
60922 IEEE mantle of Electrical&Elec. 182.10 Membership
80923 Industrial Distribution Group 1.850.29 Mechanical Pads Supplies,Point Locks&Toole
80924 Innariine Engineering 448.85 Sewerline V490 Impeclions
80925 Inorganic Ventures,Inc 270.87 Lob Pens&Supplies
80920 win Mountain 100.00 Storage Fea-Bid Documents Pt-37
80927 ISA WO.BO Books&Publications
80928 Jays Catering 967.95 Meeting Expense
80929 John Bell Pool Service 2,170.00 Service Agreement-Addim.Bid,.Aldum Pond
B0930 Johnstone Supply 1,672.73 Electrical Pans&Supplies
50931 JPL Compressor Service,Inc. 5,714.48 Gas Compaesr Paris B Supplies
80932 home Advance Mslane18,Inc. 2,321.90 Professional Services-Analyi of Non-Destructiva Twang
80933 Lob Safery Supply,Ind 54.74 Lob Pods&Supplies
M934 Laxis Nexis Melihew Bender 428.70 Books&Publications
M935 Lustre Gourmet Finds,Ind 91.35 Meeting Expense
m936 Material Control,Inc. 615.24 Mechanical Pads&Supplies
W937 Similar can Supply Co. 536.14 Mechmical Pane.Supplies&Recall
W938 MCR Technologies,Inc 2.692.21 Instrument Pans&Supplies
W939 Medlin Controls Co. 447.41 Instumenl Pale&Supplies
80NO Mallon Taal 23,127.38 Investment Custodian Bank
BOWL Metmlech Corp. 332.93 Electrical Pipe Markers
80942 Mdmy Mfg.&Machining Co. 1.920.00 Repairs&Maintenance-High Rate Mixing Pump
80943 Mission Abrasive AS Janitorial Supplies 161.40 Janitorial Supplies
80944 Mitchell Instrument Co. 75.71 Instrument Pane B Supplies
80045 National Electric Manufacturing Corp. 501.03 Publication&Books
80946 National Fie Pleaded Aswcieldn 187.43 Boob&Publications
W247 National Plant Services,Inc. 480.00 Vacuum Truck Services
BONS Neal Supply Co. 638.98 Plumbing Supplies
BONS City of Nenporl Beach 117.67 Water Use
50950 OCS Reprographics 10,331.82 Priming Service-MO VaRID
W951 Dike Depend Business Services Divislon 213.43 M.Supplies
H.Me m CEL.ampmAPBfu EA me Pals RepedasoTCalme Pod flagon-osiers Page a15 EKHIBITA
m S1is, w N1Vmoa
Chime Paid From 05101N8 to 0511611a8
Warrant No. Vendor Amount 13morlWIs
80952 Ones."Disinbuters,Inc. 3.89g.92 Electrical Pena&Supplies
80953 Oracte Corp. 14.418.74 Training Regislration&Maintenance Agreement Renewal
50954 Orange Community Bank 1,111.00 Construction P24U,Retention
SM55 Orange County Wale District 648.01 Joint GVJRS Protect J36
80956 Orange Fluid System Technologies,Inc. a28.89 Plumbing Pans&Supplies
80957 ORCO Construction Supply INA4 Melling Point
80958 ORE Offshore 2.567.8a Zinc Anodes&Bafterles
80959 Oxygen Service Company 143.50 Specialty Gases
80960 PAC 521.60 Lab Pads&Supplies
80981 Pacific Mechanical Supply 3,230.96 Plumbing Supplies
80962 Persons Water&Infrastructure.Inc. 14,017.87 Professional Services J-35-1
B0963 PCS Express.Inc. 226.74 Courier Service
a0964 PL Hawn Company,Inc. 158.07 Electrical Pans&Supplies
80965 Primary Source Office Fumishinga.Inc. 12.866.36 Office Fumilum&Misc.Equipment
80966 Project Management Institute 154.00 Membership
80967 PROPIPE 8,523.a4 Between.Cleaning-City of Tustin&Unlnmrporeted County Property
B0968 PrWengal Carman Supply 3,130.05 Unl sea a&Related Ankles
abide PS TEK L.L.C. 1,207.46 Oil Filters
W970 Pumping Solutions,Inc. 1,269.18 Pumps
W971 Raven Biological Laboratories 103.93 Lab Parts&Supplies
80972 R Company,L.T.O. 3,800.00 Software Maintenance Agreement-Image 2000
80973 peaks:Corporation 581.30 Lab Paris&Supplies
80974 RM young Company 235.00 Commason of Word Indicator to Dual Station-Ocean Monitaring Vassal Norisea Lob
00975 RMS Engineering Is Design,Inc. 2,620.00 Engineering Services-Structural Evaluation of OAF Cover
a0976 Rockhund College Conlinukg Educatron 537.19 Books&Publications
80977 RPM Electric Mature 90.51 Motor
W978 Set T Rea Systems.Inc. 999.43 Lab Pens Is Supplies
80979 SBCIMCI 22.67 Telepla no Services
80980 South Come Emdronmenlel Co. 845.00 As OuaMy Monitoring
80981 Shamrock Supply Co.,Inc. 1,153.56 Safety Supplies
80982 Shuniluck Sales&Eniiirreenng 886.69 Mechanical Parts&Supplies
80983 Siemens W Jansen Instrument Co. 5.254.91 Instrument Pans&Supplies
609" Skalar,Inc. 282.33 Lab Pads&Supplies
80085 Smith Emery Company 100.00 Soils,Concrete&Other Materiels Testing
80986 Snmi-0n Tools.Inc. 555.25 Toole
80987 Southern California Torre Service 3.584.00 Repair,&Maintenance Service-Absorption Chillers at P9.1
80988 Southern Counties Lubricant 3.670.74 Oil
80089 Spading lnshuments,Inc. =11.62 Magnetic Flow Meters&Pans
80990 Spec Services,Inc. 24.274.69 Engineering Services J-33-1
$0981 Shimmy Steamer Inlemetional.Ina I,D32.0D Carpel Cleaning Senecas
80982 Stratus Environments Inc. 8,205.00 Protssionel Services-Groundwater Monitoring
00993 Summit Steel I'sil 38 Miami
80994 SunwlFard 339.12 Vehicle Pens&Service
50995 The Callon Products Co. 115.19 Orange Form for Mooring
80996 Thermo Elaclron North America,L.L.C. 3,221.50 Lab Pods&Supplies
80997 Thompson Industrial Supply.Inc. 7,771.24 Motor&Mechanical Pane&Supplies
80998 Tony's Lock&Sat Service&Sales 21.65 Locks&Keys
80999 Traffic Control Service.Inc. 285.54 Orange Traffic Vent
$1000 Tranisr PHE,Inc 1,187.46 Commie Sets Tax-P.O.41421
X wegNn1 XCEL duVA SHARE1CIema Poe ReyAnBelprNU Poe Reason-05�ISW EXHIBITA
nmttasc Page 4 of b14INYa -
Claim.Paid From 05MIM6 to 0WIMS
Warrant No. Vendor Amount Description
$1001 Truck&Auto Supply,Inc 227.30 Automotive Pads&Supplies
81002 Ultra Seismic. 571.36 Lob Pads&Supplies
81003 The Unsource Corporation 716.14 OMm Supplies
81004 United Pacific Sundaes.Inc. &490.00 Repair&Maintenance Serves,-Seel Sabah Pump Sta,
81005 United Pumping Se em 2,711.61 Pumping Service
81006 US Aino nditiodmil Distributors,Ina. 288.23 Thermostats
$1007 Vapex,Inc. 2,620.00 Immediate Pane&Suppose
81000 Varian,Inc. 4,141.74 Lab Instrument ServcelCleening
$1009 Vented California 705.85 Telephone Services
81010 Vemes Plumbbq 150.00 Service Contract-Testing&Can.Back0ow Devices at File,1&28 Pump Box
81011 Vortex Corp. 1,300A0 Door Repair&Meletenence-Power Bldg,B Roll-Up Door
61012 VIM Scientific Products 5.620.01 Lob Pans&Supplies
a1013 Wallingford Soltvrare,Inc. 6,2sa.29 Annual 3plhvire Maintenance
81014 Water 3 Engineering,Inc 1,062.13 Engineer,Services J47
91015 Moorman Supply Co.,In 974.25 Chain
51016 Westn Corporation 1,214.31 Lab Paris&Supplies
51017 M.I.Sanitary Supply 240.19 Janitorial Supplies
51018 W F 288.00 Membership-Mier Environment Federation
81019 WEF Registration Dept. 100.00 Meeting Registration-Div.620
81020 West Lite Supply Company.Inc. 226.21 Electrical Pans&Supplies
81021 Weston Solutions,In, 14.055.00 Outside Laboratory Services-Cora Oman Monitoring Program
91022 Wised Supply.Ix, 10.13 Funding Pads&Supplies
81023 XEROX Common. 210.12 Slaflonery
51024 Ca6l0mle Bank&Trust 6,071.00 Construction J-33-IA,Retention
51025 Olmon Construction,Iz. 10,005.00 Coeslmafion P2.82
810H Layne T.Beroltll 542.10 Mesfing/TrainIN Expense Reimbursement
81027 Mane Be.. 00.73 MesfinglTouning Expense Reimbursement
81028 Arm H.Brandvoid NSA3 Meating/Traming Expense Reimbursement
81029 Dean M.Coleco 392.02 Meefinip Traimog Expense Reimbursement
$low Doug M.Dyaen 15.00 MeefinglTraming Expense Reimbursement
81031 Therese Evans 188.79 Meefingfrraming Expense Reimbursement
81032 Melanie L.Francis 282.55 Maefingri mining Expense Reimbursement
81033 Pamela A.Koester 612.02 MerefingnTrelning Expense R9lmbulsemeM
61034 Michael D.Masterson 358.10 MaefinglTmining Expense Reimbursement
81035 Johnny J.Roche 130.00 MeelingrTraining Expense Reimbursement
$1038 Mandmix S.Taylr 182.00 MeatingfTreloing Expense Relmbumemend
81037 Simon L.Watson 444.44 Mestingr7mining Expense Reimbursement
810311 Voided Check
81039 Big Canyon Country Club 368,500.00 ConeWadpn 542
610 O Brown&Celdwull 156,617.57 Perfesslonsl Services P241
81MI City of Le Palms 64,350.00 Cooperative Projects
81042 Kemlron Companies,Inc. 44,380.61 come Chloride
81043 NALCO Company 32,807.93 Anlanic Polymer
81044 Orange County Mier District 63,194.66 OAP Water Project
SINS Peak Investment Management Co. iWA03.31 Investment Management Service Rea.95.97
SINS Pion$arAmerms,Inc. 102.253.55 Sodium HypochtoriM
81047 Southern California Edison 61.295.40 Power
SINS US Peroxide,L.L.C. 31.628.38 Color&Corrosion Control Treatment for Coll.Sys.;Hydrogen Peroxide&Ferrous Chloride
81049 Weem McAeb 35.311.59 Miler.Agree.-0 nIl&Screening$Removal&Digester Mel'I Removal
trades
nMXCEL.NMSNPe1l4RE'CWmr Pad Rpe4MATCYM Fee tl expert-0eVWG Pop 5 of
a"vToX
CMlms Paid From 05101106 to 05115MS
Warrant No. therefor Amount Description
81050 J F Shea Construction,Inc. 1,035,866.25 Consbuchon J-35-1
81051 Accounting Options,Ire, 3,267,48 Temporary Employment Services
81052 ACEC 89.95 Publications&Books
81053 AETC 5,706.00 Air Duality Mandarin-MIA Testing of PEMS at PIL 1 CGS Engines
51 OU Air Products&Chemicals,Inc. 998.00 Professional Services P247-3
51055 American Express 22,61B.97 Purchasing Card Program,Me=Supplies&Serxices
BIND American Water Works Assoc.NJeOer 130.00 Membership
81057 Ashbrook Corporation 18,603.13 McWnical Pare Is Supplies for WnMepmes
81058 AT&T Universal Bitter 1.609.59 Telephone Service
81059 Basic Chemical Solutions.L.L.C. 8,247.73 Sodium Blaulgle&Sodium Hydroxide
810B0 Bennet)Bowen Lighthouse 127.00 (6)Siasyetems Monitors
81061 Court Trustee 98.62 Wage Gamishm.nl
81062 California Hazardous Services,Inc 502.50 UMargmund Storage Tank Monitoring Codifications. Soft Bucket Test 8 Light Replacement
81063 Coast Transmission 1,870.26 Transmission Replacement V483
111064 Code Electrical Classes,Inc. 123.00 Publications&Books
810M Compressor Components of California 1.20.00 Repair&Maintenance Services-(32)Coils LSVB Ignition
SING Construction Book Express 9190 Publications&Books
81067 Consumers Pipe&Supply Co. 133.39 Freight Services
8108E Corporate Express 1,81 Off.Supplies
81089 County of Orange 13.50 Wage Garnishment
81W0 CWEA Membership 100.00 Membership(Calif.Wafer Emineued Assi
81071 Department of Child Support Sarvbw 300.00 Wage Garnishment
51072 OHL Express USA,Inc. 38.62 Freight Services
81073 Ecology Control Industries 11,010.40 Haurdous Wavle Disposal
81074 Edinger Medical Group,Inc. 650.00 Medical Screenist,
61075 Employee Benefils SpecialiMa,Inc. 10723.92 Relmbursed Prepaid Employee Medical&Dependent Co.
$1078 Employment Development Dept, 6,000.00 Slate Unemployment Tax
81077 Court Oster 420.00 Wage Garnishment
81078 FEDEX Corporation 172.66 Freight Services
81079 Franchba Tax Boi 506.86 )Nape Garnishment
Blow GeoBvly,Inc. 3.450.00 Professional Services-Flow Monitoring at OCSD Manhole
810B1 Gi Daniel Wordwed 4372 Mechanical Pads&Supplies
81082 Goei 124.12 Publications&Book.
81083 Heat Technology Products 2,745.00 Repair&Maintenance S.rvKes-Oil Heat Exchanger ea Blower
81084 Hill Brothers 9,137.57 Chemicals Odor&Corrosion Central-Newport Trunkline
$1085 IEEE Insfilule of ElecWcal&Es 91.59 Books&Publications
81086 IESM Publralia. 425.00 Books&Publications and Membership
81087 Inert.EPA 320.00 ECM Publication
81088 Internal Revenue Schwa 126.00 Woe Gemiehmenl
81089 Ind.Union of 01 Eng.AFL CIO Laval 4.617.58 Dues Deduction
810M IM..Ranch Wabr Di90ict 5.45 Water Use
81081 ISI,Ina 3A9600 Software,Maintenance&Support-Inforlel for W ndowa 1000 wNolling Software
81092 Ji mbon Engineering Contractors,Inc. 9,770.61 Repairs&Maintenance Services-lath Street pump Station
81093 Jaya Catering 676.75 Meeting Expenses
81094 Kelly Paper 152.30 Paper
SING Kforca,ins. 5,393.03 Temporary Employment Services
81096 IA Testing 177.00 Asbestos Analyses
SINT Court Order 150.00 Wag.Garnishment
81098 Lormen Education Services 319.00 Training Registration
Hwagwn`E%CBL41eVAwP3lswtN:Wma NYleprvl`MOTCIo'Ip lVtl Rpm-ostsp EXHIBIT
nMtpla Page 6 of 8 6 xdQM
Claims Paid From 05/111108 to 051111106
Warrant No. Vendor Amount Description
81099 Manpower Professional 5.088.00 Temporary Employment Serviees
81100 Material and Contract Services 4,960.00 Temporary Employment Servkea
91101 M.M.M.Can Supply Co. 610.25 Mechanical Parts&Supplies
$1102 Midway Mfg.&Machining Co. 3,129.81 Repairs&Maintenance Services-Hi-Rate Mixing Pump
81103 Mission Uniform Service 254.39 Unit.Rentals
811a4 Court Omer 225.00 Wage Garnishment
81105 NACE Infemalional 165.00 Membership
$1106 National Bond&Trust 2A45.20 U.S.Savings Bond.Payroll Decupttns
81107 Norse It Moore Corporal.Accounting 200.00 professional Services-Sella.Concrete&Other Materials Testing Pt-37
at too O C Tanner Recognition Company 1,100.93 Employee Service Awards Program
silos OCEA 548.90 Dun Deduction
81110 Oaks Depot Business Services Division 3,557.75 Office Supplies
Stitt Onesource Distributes.Inc. 45.37 Electrical Pans&Supplies
B1112 Orange County Sheriff 65.00 Wage Garnisheed]
81113 Oxygen Service Company 1,468.88 Lab Parts&Supplies
81114 Padgett-Thompson 10.00 Training Registration
81116 Peace Officers Council of CA 1,612.00 Dues Deduction,Supervises&Professionals
81116 pildey,Bowes 172.00 Postage Machine Service
41117 Polydym,Inc. IS832.44 Cations:Polymer NO 3.11-92
B1116 Prudential Overall Supply 1,485A0 Unitmts&Related Articles
Bills RBF Consulting 3,043.00 Englneedrg Services 241&2414
81120 Seen Engineering,Inc. 11.950.00 Construction-PVC Sewer Pipe Rehatkide ion Project
81121 SBCMCI 745.22 Tal.phona Services
81122 Scetl Specia8y Gans,Inc. 7.604.71 Leo Pella&Supplies
81123 Shusluck Saks&Engineering 134.51 Mechanical Pods&Supplies
$1124 Coun Order 721.50 Wage Garnishment
$1125 So.Cal Gas Company 23.084.54 Natural Gas
81128 Sofichoice 599.54 SaBWsre
51127 SSPC The Sm sely for Protective 95.00 Membership
Olin $town Enterprises.Inc. 824.29 Office Supplies
811M Systems Solution Company 170.00 Repans&MaintenamceServices-Access ConlmVCCW Security System
81130 TeolMlrod 1,151.00 CD ROM&Paperbed CD-RPM-National Electrical Safety Code&IEEE Color Books Set-Div.760
81131 The Standard Innrer¢e Company 86.90 Executive Disability Insurance
81132 Thompson Industrial Supply,Inc. 2.807.63 Mmsomical Pads&Supplies
81133 TPC Training Systems 450.00 Training Registration
81134 Trod&Auto Supply.Inca 81.47 Autamotiw Paris&Supplies
81135 The Uninuna Corporation 568.89 Office Supplies
81136 funded Direct Marketing 9.011.51 Publo Outreach Printing&Distribution Castle&Postage Permit I-24
81137 United Parcel Sendee 76.14 Parcel Services
81138 United Way 150.00 Employee Contributions
91139 WEF 144.00 Membership-Water Environment Federation
51140 M"EC 675.00 Meeting Registration-DM 820
81141 XYon Bustden Solutions,Inc. 8,520.00 Temporary Employment Services
81142 Cold Omer 597.50 Wage Garnishment
81143 Delke&Sons Constructions.Inc 12.228.50 Constructors P2-66-2
81144 Nicholas J.Anbontea 20.00 MeetinglTraming Expense Reimbursement
81145 Layne T.Select 611.54 Meetinganum g Expense Reimbursement
81146 James E.Colston 406.63 MeetingrTraining Expense Reimbursement
81147 Mark A.Enw, 10.U0 MeetinglTraining Expense Reimbursement
HMrplwn�E%CELau12AMP81GRECYMnvrtld n.pmemmv;l.mevm Bepan-o&194B Piano EXHISITA
"aw a9 8`14100e
Claims Paid From 051011U6 to 05M N6
Wermnl Na. Vendor Amount Description
81148 Randy E.Hams 10.00 MeeliagRminmg Expense Reimbursement
81149 Andral loan 845.51 Meeting/Training Expense Reimbursement
811W Tent'W.Me 580.90 Me rtingrialning Expense Reimbursement
$1151 James McCann 170.00 Meeting/Training Expense Reimbursement
81152 Samuel L.Macabre, 23.00 MaelingRreining Expense Reimbursement
81153 Unw sh N.Mudhy 154.00 Maelingarmning Expense Reimbursement
81154 Sharon Nebus 914.20 MeetingRraining Expense Reimbursement
81155 Elbn Rey 559.23 MeetinglTramin,Expense Reimbursement
811H James G.TnBe 10.00 Meeting(Tralning Expense Reimbursement
81157 Rachel J.Van Exel 1,209.05 Meeting/fnining Expense Reimbursement
81158 Mena Polo S.Ve4xa 861.22 lieetingrtrainin,Expense Reimbursement
81159 Simon L.Watson 10.00 Meellogaralning Expense Reimbursement
$1160 Morns C.Yin, 139.00 Meeling[T arcing Expense Reimbursement
91161 Paula A.Ze0ar 170.00 Meeting/Training Expense Reimbursement
01162 Alan Corey 554.00 MeetinglTrainin,Expense Reimbursement
81163 Orange County Sanitation District 14.384.37 Wader's Camp.Relmb,
81164 Southern Deli orme Edison Company 11,300.22 Construction FE-0544
VMS Y.J.Shoo 190.00 MestingRrabing Expense Reimbursement
Total Accounts Payable-Warrants $12.056.98 .TO
Payroll Disbunareamb
33289 - 33388 Employee Paychecks $ 143,589.50 Biweekly Payroll OVIO12006
33399 - 33394 Employee Paychecks 10,600.17 Interim Payrolls-Various B Terminations 5IM0068511112006
125628 -128194 Direct Deposit Statements 1078.50943 Biweekly Payroll OM10N6
Total Payroll Disbursements S 1.23J 06810
Wire Tnnefer Pavments
OCSO Payroll Taxes 8 Contributions S 629,067.46 Biweekly Payroll 0WIMS
Deutsche Bank 488.324.97 Series 2006 Certificates of Participation April Interest Payment
Lloyds TSP Bank pis 61.057.29 Serbs 2001 COPS Standby Purchase Agreement Commitment Fee(0&OINB-0SNIN61
Chase Manhattan Bank 64,411.31 Series 2000 Rehleding COPS Standby Carlificats Purchase Agreement Commitment Fee(02J011084NON
JP Morgan Chase Bank 13560T.50 Series 1993 Refunding Certificates of PankJpafion April Interest Payment
Total Whe Transfer Payments 1.30,469. 3
Total Clalme Paid 05101106-OW15MS 514,668,236.33
n.eomanIExCEL Ma1lmwPS..rOnlms Pax men.ncwlma Pala nepn-pslaa9 EXHIBIT A
InQlm Page 8 of 8 b1Y4,0011
Claims Paid From OSHSroe to 0613IMS
Warrant No. Vendor Amount Description
Accounts Payable.Warrants
81166 Air Products&Chemicals S 25,829.07 0&M Agreement Cry.Gen.Sys.MO 8249
61167 Block&Vestch Corporation 48.154.14 Engineering Somme J-77
B1188 Cenollo Engineers 79.352.83 Prafessianel Services 200548 Rate Study
51169 Cemllo Engineers 149.853.20 Professional Somme P2418
81170 City of Fullerton 130,435.56 Cooperalive Projects Reimbursement Program
81171 GHO.L.L.C. 65.521.00 Profesi0nal Services-Asset M......fit Program
01172 Innedine Engineering 68.055.17 Sewedtne Video laspedlons-Various Locatlons
01173 Jamison Engineering Contractors,Inc. 41.815.32 Repairs&Meint.Svm.-Mt.2 Headwarks C Slide Gate Auxlliary L01ing Sys.Protect&Canal Vent Pipe
01174 ".Iran Companies,Ina. 78,250.98 Fenic Chfenda
81175 Malcolm Middle.Inc. 159,505.98 Prolessional Services b79
81176 Mett.de Lilo Insurance Company 36.940.24 Group LRe.Manager Addl.Life.Shad&Long-Term Disability&Optional Term Lge Ina.
81177 Orange County Business Council 25,000.00 Membership
81178 Orange County Water Giants 9.128.057.94 Joint GWRS Project J48
01179 Pioneer America&Inc. 71.972.10 SOdium Hypochlorla
81180 Tale RenchBAegen Farms 242.750.01 Residuals Remo it MO 3.29-95
011111 US Peroxide,L.L.C. 113,787.17 Odor&Corrosion Control Treatment for Coll.By.:Hydrogen Penoxae&Ferrous chump r
a1182 Meant Paolo Co. 602AN.00 Construction 5-51&5-52
01183 San.Engineering,Inc. 121.698.00 Construction-Manlgle Rehabilitation Project 7.21
0110a Shasta Electric,L.P. 49,117.00 Construction SP-94
was Wells Fargo Bank Mac C7300-012 8&858.00 Construction 5-51&5-52,Retention
81185 AWCholanon 782.08 Mechanical Pens&Supplies
$1187 Absolute Standards Inc. 384.00 Lab Perot&Supplies
511M ACE Ergonomics 966.30 Prof.Services-Ergonomic Wore lop Ewla.:Training.Reaoamh.Reports and Olfice Chair
81189 Advanced Sealing&Supply Co..Inc. 296.31 Mechanical Pans&Supplies
81190 Aigas Safety,Inc. 434.65 Safety Supplies
81191 Aigas West 8.40 Demurrage
81192 AIIMed.Inc. 39.46 Egonomlc Compumr Supples
81193 Amrican Air Filter Inc. 835.89 Air Fi0ers
81194 American Fidelity Assurance Company 344.40 Employee VOkretary Cancer Insurance
81195 American Public Warks A3.auaron 150.00 Training Registration
81196 American Seals West 72.61 Gaskets
81197 Ammch Elevator Services 1.400.00 Monthly Elevalar Maintenance at Pits.1&2
01198 ApplaOna Employment Service 4,826.29 Tamponry,Employment Services
81199 Applied Indasinal Technology, 38.10 Mechanical Pans&Supplies
81200 Aquarium Doctor 116.21 Human Resources Aquarium Samoa
81201 Arch Wireiess 884.54 Paging Service-AiNme.Service&Equipment
01202 ASCE Continuing Education 496.00 Meeting Registration-Division 740
81203 Ashbrook Corporation 18,390.13 Filter Press Pane&Supplies
812" Antericed Telephone&Telegraph Corp. 26.61 Telephone Sam.
81MS Awen0s&Trophtes Company 188.99 Awards&Trophiss
81XB AWSI 213.00 Department of Transportation Program Management&Testing
812W Bade Wells Asaacloti s 6.697.62 Professional Services-Sewer Rate Fee Review
$1208 Battery Spectaltfes 1.885.53 Batteries
81209 BC Who Rope It Rigging 1.831 32 Mechanical Pans&Supplies
01210 Camel Financial,Inc,cro gating Metal 465.45 Metal
411211 Bell Pigs&Supply CO. 720.20 Mechanical Part.&Supplies
01212 Benz Engineering,Inc. 927.00 Air Filler Centralia
01215 BloMerleux Vitek,Inc. 587.85 Lab Pans&Supplies
01214 Siospherical lnslrumenls,Inc. 1.319.11 Lab Pan.&Supplies
81215 Boyle Engircennp Corporation 9,660.03 Professional$ervices 1.2.4
$1216 Sucknam&Associates,Inc. 1,904.75 Pavemect Management Services
M WeNNn`E%CElE1NaTM61NRECYLm PM Rr{MWOICYM1m Pap Reps-4 1. EXHIBIT B
Aturem Page 1 or 13 6,14200e
Claims Paid From 08116MG to OU31MB
Warranties. Vendor Amount Description
81217 Philip F.Cordova 1.709.98 Employee Computer Loan Program
8121E CA Emissions Program 29.79 District Vehicles CA Emissions Program Testing Fee
$1219 Cal Glass,Inc. 4,887.33 Lab Paris&Supplies
91220 Cal Protection 315.00 Repair&Maintenance SeMces-Fuca Holder
81221 California Barricade Rentals 2.750.00 Barricade Rentals&Werksile Protection
81222 Celifomia Wssrdoue SeMces.Inc. 4.813.95 Underground Storage Tank Repairs,Testing&Codification
81223 CNibmia Relocation Services,Inc. 472.50 Office Files Movi,dlirlocaticn SeMces
81224 CAI-PLY 80.85 Calling Tiles
01225 Camarsers.cem 99.95 Nolke$&Me
812M Cardlock Fuel Systems,to . 19,984.03 Fuel Card Propram-District Vehicles&Mcndoring Vessel
81227 Cad Warren&Co. M3.99 Insurance Claims Administrator
SIMS CEM Corpmation 435.54 Lab Pads&Supplies
81229 CM Distributors,Inc, 1.229.49 Mechanical Parts B Supplies
81230 CMAA 255.00 Meeting Registration-Division 760
81231 CompuCom Systems,Inc. 16,217.43 Computer Hardamm/Software-Cisco Secure ACS 4.0
SIM2 Computer Protection Technology,Inc. 2,883.N UPS Repairs al Pit,2 Truck Loat ing Station
$1233 Consolidated Elecliicel Distributors,Inc. 330.37 Electrical Paris&Supplies
81234 Consolidated Plastics Company 38.34 Lab Pads&Supplies
81235 Consumers Pipe&Supply Co. 1,051.22 Plumbing Parts&Supplies
$1236 Commit Motion Solutions 2,638.M Electrical Pads&Supplies
$1237 Cooper Cameron Corporation 1,151.2E Ergine Supplies
81238 Corporate Business Inferiors 3,870.60 Cubicle Reconfiguration-Pot. I Human Resources BMg.
81239 Corporate Image Maintenance,Inc. 338.00 Custodial Services Spec,No.9B9g-og
61240 Cpnach Engineering 0.200.30 Pump Supplies
81241 County Wholesale Electric Co. 4518 Elecbical&Mechanical Parts&Supplies
81242 CR&R,Inc. 2.355.00 Container Rentals
81243 Crane Veyor Carp. 4,751.33 Maintenance Agreement-Oddly.Inspections,Codification&Quadrennial Testing
81244 CSUF FOundation 11,389.50 Membership-Center for Demographic Research
8124E Culligan of Orange County 44.05 Maine.Agreement-Can Can Water Softener System
81246 O vid's Tree SeMce 5,540.00 Tree Mmnt.Service
B1N7 Covert Pumps&Pads,Inc. 5,276.00 Pump Pads&Supplies
8f248 Dlckson's.inc. 348.25 Air Conditloner
B1N9 Digpholo 7.98 Photographic Services
81250 D,Harvey Goldstone 7N.00 Safety Glasses
8101 Dunn Edward.Corporation 107.00 Paint Supplies
91252 Dyndmi Corp 725.94 Instrument Repair 8 Main1.Services
81253 Environmanal Engineering&Contracting 14,000.00 Prof.SeMces-Pmparationamining-Indus.Wasteauder Third.Operator Tmg.Course Wl
812fi4 Edinger Medical Group,Inc. 395.00 Medical Screenings
8125E Ederm M.Perkins 1,596.31 Professional Service -Water Ouility Compliance
81256 Electrical Reliability Services 8.509.25 Professional SeMras-Electrical Reliability Testing for Capital Projects
61257 Electrical Sales.Inc. 526.14 Motor
81258 Enchanter,Inc. 3,300D0 Ocean Monitoring&Ougell Inspection&Maintenance
a1259 Entecln Instruments.Inc. 0,368.14 Lab Pens&Supplies
Mail Environmental&Occupational Risk Mgmt. 1,719.00 Professional Services-Indoor Air Ouality Investigation
81281 Emfronmental Compliance Inspection Svce. 1,840.W Professional Services-Fars,Of Chinese(FOG Program)Inspeclions
8IM2 EpuIOCo 7,840.06 Instrument Maint.
81253 Ewing Irrigation Industrial 694.73 Landeci Irrigatlon Pads&Supplies
612M Esprees Lens lab 1,992.47 Safety Glasses
81265 FEDEX Corporation 66.14 Freight Services
81M6 Ferguson Enterprises,Inc 647.58 Valves
II Finemach 1,491.01 Mechanical Pads&Supplies
81MO Flshm Scientific Company.L.L.C. 9.317.95 Lab Pans&Supplies
HteplMn`F%C6LmaVIDAP9WNE1pa4m Pap Naparl`IDO7'CWma Ptlf flagon-OaJ1A0 EXHIBITS
"104c Page 2 of 13 6'1Y2aa4
Claims Paid From 06110/06 to OU31MG
Warrant No. Vendor Amount Deacriptlon
8TIS9 Fleet Research.Inc. 170.00 Pusession
81270 Fabled Emyrreering&Survaying.Inc. 2,MAS Survaying Services-Venous Capital Projects
01271 Fountain Valley Rancho Hand Wean 571.00 Vehicle Washing&Waxing Services
61272 Franklin Covey 38.17 Office Supplies
81273 Frosco Profiles 956.12 Human Resources Background Checks
81274 Frye Electronics 192.83 Computer Supplies
61275 Oanehl Lumber Company 725.94 LumberMardwme
81278 Gerard Daniel Wordwitte 255.07 Machankal Paris&Supplies
$1277 Oietlich-MltnAall,Inc 196.82 Mechanical Pads&Supplies
81278 Goldanwesl Wtnclow Service 2,980.00 Groundekesping Services
81279 Grainger,Inc. 7,902.97 Mechanical Pans,Supplies,Tools.Shelving&Motor
81280 Grating Pectic,Inc. 3,172.1E Fibergleae Greling
91281 Gri Electric Company 17.040.51 So&wsrefHerclwere-Upgrade Modicon PLC CPU Modules&Modbus Plus Comm.PCl Cards
$1282 Greet Western Sanitary Supplies 230.86 Janitenal Supplies
$1283 Guarantee Records Management 450.93 O1 Records Sterage
81284 Hasker Equipment Company 8,415.23 Misc.Vehicle,Pads,Repair&Service
81285 Hach too Porten Industries 1,017.38 Lab Paris&Supplies
8128E Harbour Engineering Group 18,492.a0 (3)Impallers&(2)Elbow Liners
81287 Hardy Diagneelica 544.88 Lab Pens&Supplies
$1288 Harold Primrose ice WAS to For Samples
81289 Hest Technology Preclude 3.804.53 Repair&Maintenance Service-Capper Tubing
81290 Hsv4e0 Packard Company 7,154.76 (2)Server&(2)PC's
81291 Home Depot 993.08 Misc.Repair&Maintenance Malenal
51282 Id. S,aia.W Lab Parts&Supplies
81293 Industrial Distribution Group 741.89 Mechanical Pena.Supplies&Tools
81294 Industrial Fiber Manufacturers,Inc. 2,497AS Filler,
$INS Industrial Malal Supply 600.66 Make
51296 Industrial Threaded Producer,Inc. B,(li Imenlory Fasteners
81297 Inorganic Ventures.Ind. 242.62 Lab Pads&Supplies
51298 Interstate Batteries of CM Coats 736.36 Batteries for Vehicles&Cads
512M Jsok.X.Change 404.07 Equipment Rentals-Hydraulic Jack
613M Jets Catering 1,488.46 Meeting Expenses
81301 JPL Compressor Service.Inc. 3,103.20 Gee Compressor Pans&Supplies
alW2 JWC Environmental 12.840.16 Repair&Maintenance Services-Rebuild Muffin Monster Gondar
81303 Keeps,Inc. 1,914.00 Temporary Employment Sarvicas
81304 Ignoramus General Completes.Inc 3,25111 Repair&Maintenance Services-Concrete Pad at Control Center
81305 Igainerlder,Inc. 812.00 Soils,Concrete&Other Materiels Testing P266
51305 LECO Corporation 803.71 Lob Pans&Supplies
81307 Laxis xlexis 173.46 On-Line Subscription
81306 LINJER 11.185.72 Pi ..most Service-DART MO 9-22-99
81NO Lerman Education Barrens, 538.00 Training Registration
81310 Lucors Gourmet Foods,Inc 484.24 Meeting Expense
BIW Manpower Professional 1,846A0 Temporary Employment Services
61312 MasaMutuel MIchad Financial Group 145.41 Exedudve Disability Plan Premium
51313 Malarial and Contract Services 4,464.00 Temporary Employment Services
81314 Mayer HOBman Wei PC 266.00 Training Reglslmlion
81315 McMaster Can Supply Co. 688.55 Mechanical Pads&Supplies
81318 Medlin Controls Co. 2Po.73 Instrument Pens&Supplies
$1317 Mesta Consoli0aletJ Water DislriG 16.19 Water Use
81318 Met Weal Associates 144.42 Pump Pere&Suplitiea
61318 Miller Equipment Co. 881.4E Pump Repairs&Motor Oil
a1320 Mission Uniform Service 137.9U Unform Rentals
HMeplawExC5l.aadANPSH4REVAen.wm wPrnmgncwmxwm wpm-0i EXHIBIT B
e. mrs P.,.3 of 13 N1i
Claims PaM From OWIM6 to OWIMO
Marsh No. Vendor Amount Description
81321 MM Amerces,Inc 85WAS Professiorel&micea1101
813n Neal Supply Co. 14.67 Plumbing Supplies
81323 Nestal Communications 868.30 Cellular Phones&Air Time
81324 0 C Tanner Recogmem Company 1,052.90 Employee Service Av2Ns Program
81325 OCB Repnographiw 226.73 Pruning Service-MO 1126100
813M OMI Induslnes 2,910.00 Chemicals
81327 Onesource Distributors.Ice. 8,360.59 Elacmcel Pans&Sup011es
111328 Orange County Vector Control Distinct 353.W Pest Control
81329 Orange Fluid System Technologies,Inc. 47.96 Lab Paris&Supplies
81330 Orygen Service Company 3,756.34 Lab Part.&Supplies
81331 PAC 2,216.29 Lob Pars&Supplies
81332 Pacific Mechanical Supply 01.25 Plumbing Parts&Supplies
81333 Pmagonplamics Compar, 514.56 Aeryfle Sheets
81334 Penvalve 129.98 Plumbing Pads&Supplies
81W5 PerkinElmer Ias WAS tab pans&Supplies
81336 PL Hewn Company.Inc 3,371.54 rib Cmntl9oner Fillers
81337 POlyOyrre,Inc T.M.25 Cationic Polymer NO 3.11-92
813M Pon Supply 31.87 Engine Corrosion Control Supaes-Nersse Monnorhg Vessel
81339 Pddrd,,Inc 35.19 Lab Parts&Supplies
B1340 Pre-Paid Legal Services,lies W3.25 Employee Voluntary Legal Service Insurance Premium
81341 Primary Source CKce FumbMrgs.Inc. 1,866.T0 Olffice Furniture&side.Equipment
81342 PROPIPE 12.458.02 CCN Sewemne Video Inspections-Various Locations
81343 Pmdangal Overall Supply 1p71.40 Unilorms&Related Articles
81344 Pudic Resources Advisory Group 8,000.00 Financial Advisory Services
81345 Pyramid Fence Company,Inc. 4.4W.OD Fanning Inundation
81346 Quinn Poser System Assoc 564.911 Maintenance Agreement-Ocean Mondonng Vessel Nenssa
a1347 R L Abbott Is Associates 3.000.00 Kam County Biosolids Consulting Services
81348 Reliaver Life Insurance Company 8.041.74 Voadary Lab.Cancer&Supplemental Short-Term Disab6ity Insurance
81349 Rainbow Disposal Co. 2,9n.12 Trash Removal
81350 Red Win,Shoes 441.39 Safety Shoes
81351 Restak Corp. 608.83 Lab Pam&Supplies
81352 Ridelinks.Inc. 365.00 Training Registration
61353 Royal Truck Body 86.36 Locks&Keys-V-520
Mau Royalist Cleanms 24.00 Dry Cleaning Services
81255 RS Hughes Co..Inc. 3n.02 Paint Supplies
81356 RSA Sutler Sol Products 1,575.54 Sal Matolala
$1357 Rulan&Tucker,L.L.P. 75.00 Legal Services
61358 Safely-KIOen 621.92 Paris.Washer Lease.&Service
81359 Sancon Engineering,Inc. 21,700.00 Construction-liaMae RehabiMation Project&Repairs&Nicol-Services
81WO Sayboll.L.P. nO.00 Lab Analyses
81361 SBCMiCI 211 Telephone Services
81362 Science Application International 16.181.35 Ocean Monitoring NO 64-94
81383 SCP Spence $16.00 Lab Pans&Supplies
81364 Ciy of Seal Beall Finance Dept 116.60 Water Use
81365 Sears Name Plate 36231 SlahweO Marking Tape
81366 Shureluck Sales&Engineeing 1,221.67 Mechennral Pads&Supplies
81367 Sigma Aldrich,Inc. 320.79 Lab Parts&Supplies
81368 Skelar.Inc. 1,500.00 Lab Instrument Relocation-Uanstell&Ralrrslall Ski Flow A Irzer
81369 Skyline PuNishing Company,Inc. 195.00 Pub ications&Books
81370 SnapOn Tails,Inc 66.15 Tools
61371 So Cal Gas Company 5,161.92 Natural Gas
81372 South Coast Air Quality Management Din ISOM CPP Renewal Fee(Ceofied Plant Pmbssnonals)
HMNNnE1rCFl.mav21'M3ruREYLimavmn�wn'paenGudnpap Rom-aaa1LB UHISIT B
anolm Page 4 of 13 N144m9
Claims Paid From 06461118 to 05/31M6
Warrant No. Vendor Amount Description
111373 Southern Calionnia Edison 10BUA4 Poser
81374 Southern Counties Lubeicmd 22, MBI) an
$1375 Soulhoest Scientific.Ira. 3,452.31 Instrument Supplies
81376 Sparkk8s 1.940.45 Drinking WaterlCoder Rentals
813" Sperling lnammurds.Inc. 387.90 Instrument Pads&Supplies
51378 Stanley Steamer International.Inc. 232.50 Carpet Cleaning Services
81379 Summit Steel TZ7.61 Metal
81380 Sodom Industrial Pads 46.60 Mechanical Pads&Supplies
81381 Super Chem Corporation 884.27 Cleaner/Degreaser
513W SMCB Accountant,Office 427.00 Annual Fee-Storm Water Permit 1-24
51383 Technical Service Group,Inc 1,381.60 SCAM System VAX Service Agreement
51381 T&D Communicalka. 1,252.59 Tekwmmunimtons Calling Senice-Repair Coppeni'mer Infrastructure
$1385 Tasce Pacific Fire Protection 2.643.42 Or y./Annual Fire Sprinkler Inspectron.Men.&Cent.at Ph.1&Ph.2
81386 INCH Associahm.Inc. 829.65 Lab Pads&Supplies
81357 Teledyne RD Instruments,Inc. 579.50 Battery Perks
81308 Termmv International 859.00 Past Control
81359 The Waging Man,Inc. 525.00 Public Notice Printing&Mailing Services Various Protects 7-36
813W Thompson Industrial Supply.Inc. 21,856.58 (1)Sludge Collector.(2)Invaders.&Mechanical Pala&Supplies
91391 Thunder Eagle,Inc, 7,498.00 Manor Algid Systems
81392 T4&obile 110]5 Mature Air Time
81393 Tony's Lack&Sale Service&Sales 914.00 Looks It Keys
81394 Tortuga Pool Services 620.00 Maintenance Agreement-May Cleaning of Aunum Pond
81395 Traffic Control Service,Inc. 856.61 Reflwfw Saley Vests
81395 Truck&Auto Supply,Inc. 5535 Automotive Pads&Supplies
01397 US Fitter Corp. 60.00 Service Agreement-IN Water Systems at Plants l&2
a1390 Ultra Scientific 347.03 Lab Pets 8 Supplies
81399 Unsed Peufic Services.Inc. 16.467.51 Landscape Maintenance al Plants 1&2 end Pump Stations
81400 United Parcel Service 118.55 Parcel Services
81401 United Pumping Service 1,160.00 Pumping Service
81402 Univedid,ofMimns 10,0M00 Aswdale Member Agreement-IrWustryiUniversiy Cooperative Research Ctr.
81403 Varian.Inc. 2.274.31 Lou Parts&Supplies:Computer Hardware/SoBware-MS Workstation Upgrade
814" Varied 78.84 Telephone Service
81105 Vert.Cefilomta 119.10 Telephone Services
81406 Vemes Plumbing 1,690.00 Testing&Ced.Backhow Devices at Pits.1&2&Pump Ste.&Toilet/Sink Rapt at Bay Bridge Pump Ste.
81407 Wage Nurseries 190.20 Landscaping Supplies
81408 Vorlax Corp. 878.68 Repair&Maintenance Services-Plant 2 Exil Gaff
81409 VMR Scientific Products 5,700.20 Hydrochloric Acid
81410 The Warkmhut Corporation 12.431.42 Seventy Guards
31411 Wateo Corporation 355.86 lab Pats&Supplies
$1412 Wmie Samar,Supply 373.W Jenilonal Supplies
81413 WEF 5t14.01) Membership'Winer Environment Federation
81414 Weal Lice Supply Company,Inc 47.77 Electoral Parts&Supplies
81415 Woods Hole Group.Inc. 2,709.71 Protruiontl Serims-Ocean Monitoring Program
81416 XEROX Corpoalm 933.17 Office Supplies
81417 Xyon Sources Solutions.Inc 4.800.00 Temporary Employment Services
81418 Zee Medical 4.513.14 First And Supplies
81419 Deirdre E.Singman 135.00 Meelirgfiraining Expense Reimbursement
81420 Peons,M.Canflin 170.00 Me edn ra ning Expense Reimbursement
81421 Robed P.Ghdelli 1.027.17 Mee0ng7aimmg Eyeoae Reimbursement
81422 Michelle R.Hammingon 737.09 Mew ng/Thenum,Expense Reimbursement
81423 Steven E Howard 782.29 MeminglTreining Expense Reimbursement
S1424 Deborah L.UnEel 53.00 MeetinglTaining Expense ReimWrsement
N:aeptemvJlcal.MeltAaPBWd:X.Wm paid Refo1'g0lk;laam Ped report-05a146 EXHIBIT B
a W c. Page 5 of 13 btVipo6
Claims Paid From 05116MB to OW1106
Warrant No. Vendor Amount Description
81425 Michael D.Moore 258.OD Meetin yTrainirg Expense Reimbursement
81425 James F.Mah nee, 754.72 MmAing/Training Ixgk nse Reimbursement
61427 Ronald L Watle 162.57 Mee6ng/Traming Expenns Reimbursement
81428 Manuel Belmonte 469.85 User Fee Refund Regarding Septic Tanks
81429 Denis Bilodeau 1,521.95 User Fee Refund Regarding Septic Tanks
81430 Joseph Bisbee 1.521.95 Uur Fee Refund Repealing Septic Tanks
$1431 Code Contreras 1,521.95 User Fee Refund Regarding Septic Tanks
81432 County of Orargs Auditor Controller S1DAD Administrable Fee-Adjustments to Property Tax Bills
81433 County of Orange Auditor Controller 3W.OD Administraties Fee-Adrytlments W Property Tax Bills
81434 County of Orange Auditor Centrs0er 255.OD Administrable Fee-Adjustments W Properly Tax BBIS
81435 County of Orange Auditor Controller 195.00 Administrative Fee Adjustments W Property Tex BRIs
81436 County of Orange Auditor Controller 780.00 Administrator Fee-Adjustments W Properly Tex We
81437 County of Orange Auditor Controller 195.00 Administralkvs Fro-Adjustments to Property Tax Bills
81438 EWtse Espinoza 3,043.90 User Fes Refund Regarding Septic Tanks
81439 Robert Frespanner 1,163.55 User Fee Refund Regarding Septic Tanks
81440 J.Bud Frost 1.163.85 User Fee Refund Regarding Septic Tanks
81441 Jarvis Gall 489.85 User Fee Refund Reporting Septic Tanks
81442 Leif Gyldelrand 3,421.57 User Fee Refund Regarding Septic Tanks
81443 E ism Heim 489.85 User Fee Refund Regarding Septic Tanks
81444 Joshua Higgins 499.85 User Fee Refund Regarding Septic Tanks
81445 Vane Hovnanian Im.06 User Fee Refund Regarding Septic Tanks
81445 Tam Hulusi 1,163.85 User Fee Refund Regarding Septic Tanks
81447 Ahie Sons June 1,163.86 User Fee Refund Regarding Septic Tanks
51446 Michael Kruger 484.18 User Fee Refund Retorting Septic Tanks
31449 Jeffrey Lya0 1.893.22 User Fee Refund Regarding Septic Tanks
$1450 Ian MacMillan 2,601.81 User Fee Refund Regarding Septic Tanks
81451 Robert MCGmdy 1,695.33 User Fee Refund Repealing Septic Tanks
61452 Chnotina Mejis 1,163.85 User Fee Refund Regarding Septic Tanks
81453 John Molina 489.85 User Fee Refund Regarding Septic Tanks
81454 Michael Muller 1,163.85 User Fee Refund Regarding Septic Tanks
81455 Nanci Murphy 118.15 User Fee Refund Repealing Septic Tanks
81456 R.Jane Nelson 116.16 User Fee Refuntl Regarding Septic Tanks
81457 Leslie Nguyen 222.31 User Fee Refund Regarding Septic Tanks
81458 Ronald Page 314J7 User Fee Refund Regarding Sepik Tanks
81459 Wallace Panlenax 1,521.05 User Fee Refund Regarding Septic Tanks
81460 Linda Parks 919.50 User Fee Refund Regarding Sepik Tanks
$1461 Garth Paden 1,153.85 User Fee Refund Regarding Septic Tanks
81462 G.Davld Piper 489.85 User Fee Refund Regarding Septic Tanks
81463 Mary Rasmussen 489.85 User Fee Refund Repealing Septic Tank.
814" James Raseghien 1.521.95 User Fee Refund Regarding Septic Tanks
e14t15 Wesley&Gail Reed 118.15 User Fes Refund Regarding Septic Tanks
81468 Nine Raters 652.20 User Fee Refund Regarding Septic Tanks
81487 Ralph Roybal 1.10.85 User Fes Refund Regarding Septic Tanks
81468 Ann Schroeder 1.10.85 User Fee Refund Regarding Septic Tanks
B1469 Robed Simpson 1.163.85 User Fee Refund Regarding Septic Tanks
81470 Jeff Spagur 1.163.85 User Fee Refund Regarding Septic Tanks
81471 Joan Strickland 2.601.81 User Fee Refund Regarding Septic Tanks
81472 Stets Board of EWel¢aerm 600.00 Anmxelion Fee
81473 LeaderKe Theybig 1,521.95 User Fee Refuntl Regarding Septic Tanks
81474 James Wallace 1.163.85 Uses Fee Refund Regarding Septic Tanks
81475 Thomas kni 118AS User Fee Refund Regarding Septic Tanks
81476 Robed Zimmer 1.418.33 User Fee Refund Regarding Septic Tanks
HwgxnnExtElamv2vAFsluREv:wme used Repml'L6aTDainu petal Repro-osato UHIBIT 8
A,210sc Page 8 of 13 WMQDDq
Claim Paid From 05/16/08 W 0513IMS
Wartani N. Vendor Amount Description
81477 Blue Chose of Celifomie 365,953.32 Medical Insurance Premium
81475 Broken&Caldvro0 26,723.43 Prolenional Services P137
81479 City of Fountain Valley 25,610.88 Water Use
81480 Delta Dental 57.628.11 Dental Insurance Plan
81481 Ethan Tech,Inc. 159.892.91 Propose l Services P1-100
81482 MDR Engineering.Inc. 235,233.42 Pmlenional Services Pt-101
81483 Kaiser Foundation Health Plan 71.173.63 Medical Ins...Premium
81484 Occidental Energy Marketing,Inc. 84,704.41 Natural Gas for CanCeull
61485 Pacific Blue Mkxo 39.361.00 Cisco Bmarthlet Maintenance Agreamenl
51486 Southern C.lifomla Edison 277,160.94 Power
$1487 UBS Financial Services,Inc. 2&306.88 Remodel Fee-1993 Series Advanced Refunding COPS
81488 Accounting Options,Inc 3,267AB Temporary Employment Servkan
51489 ACGIH Worldwide 159.00 Membership
81490 ARM International 125.00 Membership
81491 American Public Mike Association 2.60D.00 Membership
81492 American Sodel,d Chill Engineer. 75.00 Put intlons&Books
81493 Aqunc Bipanay add Consulting Labs,Inc. 785.00 Mole Effluent Toxicity Testing
81494 AT&T Universal Bitter 2,064.77 Teephone Service
51495 Ando cen Telephone&Telegraph Com. 25.84 Tekphone Service
81496 Beg Pipe&Supply Co. 2,77D.34 Machaniral Parts&Supplies
81497 Business Objects Americas 12,700.80 Software Maintenance&Support-Crystal Reports
81498 Could Trustee 90.62 Wage Gamshmenl
514N Callan Associates,Inc 3,759.50 InWsimenl Adwsor
81500 Congo Engineers 13,758.25 Professional Servlons 102
81501 CEM Command OB7.03 Lab Pads&Supplies
81502 Ch inner Wireless A9trme &233.85 Welesa Services
81503 Compressor Components of Calfomts 1,468.09 Mechanical Paris&Supplies
01W County of Orange 13.50 Wage Garnishment
81505 CR&R.Inc. 316.00 Container Rentak
81506 Del Mar An h1cal 450.00 Analysts of Blusalids
8150T Depadmed of Child Supped Service 300.00 Wage Garnishment
a150B Doug Norwood Supply 04AO Ac4opdnl Time&Date Stamp Repairs-Engineering Dept.
81509 Driver Alfiant Insurance Service,inn 2,500.00 Sol Risk Travel-Acoldenl Insurance
81510 Dunn Edwards Corporation 287.24 Paint Supplies
81511 Easy Forme Sign Compeny,Inc. 3,695.61 T.unemi Hazard Zone Signs&Water Hazard Signs
01512 Enwanmenlal Lob Accredition Program 4.619.00 Application Fee
81513 Eldridge Products 6,411.13 Mae Air now Meters
01514 Employee Bemfils Specialists,Inc. 11,014.42 Rebnbursed Prepaid Employee Medical&Dependent Care
81515 Employers Group 876.00 On-Site Training-Note Taking
91616 Engineering News Record 39.00 Subscription
01517 Court Order 420.00 Wage Gamuhmenl
81518 FEDEX Cmporelion 82.44 Freight Services
81519 Frendiue Tax Board 125.35 Wage Garnishment
81520 1Electronics 1,763.94 Computer Supplies
81521 Grainger,Inc. 27.15 Electrical Parts&Supplies
81522 Hatch&Ktrk,Inn 673.90 Mechanical Pads&Supplies
81529 Industrial Distribu0on Group 25.54 Small Tod.
51524 Internal Revenee Service 121LM Woe Garnishment
51526 Intl.Union of Open Erg.AFL CIO Local 501 4.593.44 Due.DeduClkn
81526 Iron Mountain 100.00 Storage Fee-Bid Documenta Pl-37
81527 J&8 Auto Pads 241.05 Auto Pads&Supplies
81528 JG Tucker and San.Iris 8031 Repair&Maintenance Serves.-Shari AssemV,
n xMplenE%CaL4W3aTAp91N5E'4rlm.Pea AeartMayCYlim Psa Rapwl-osalas EXHIBIT B
cool Page 7 of 13 wlyype
Claims Paid From 05116106 to OWUM
Warrant No. Vendor Amount Description
81529 Jamison Engineering Contractors.1 . 1,1430.00 Installation of Electrical Outlets Mon CeOng-Correct Center Md.,IT Cont.Room,Cont.Room T"
81530 Johnson Neither Catalog Co.dba Alfa Mes 130.91 Lab Paris&Supplies
$1531 Lerman Education Services 309.00 Training Registration
81532 Lance Sag and Lungha d 3.055.00 Prou ssional Seniors-Mtemal Auditors
815M Court Omer 150.00 Wage Gemishmmt
61534 Lon Angeles Tones 236.50 Notices&Ads
8105 M.J.Schiff and Associates.Inc. 2192A6 Engineering Strom J-106
81536 McMaster Cam Supply Cp. 321.34 Mechanical Parts.Fibers&Supplies
81532 Mitlway Mg.It Machining Co. MOM Mechanical Parts It Supplies
81538 Mission Uniform Service W.33 Quest Jacket w/OCSO Logo-Dvtsion 950
81539 Court Order 225.00 Wage Garnishment
61540 National Technology Trundler,Inc.. 8.659.D0 OnSile Training-Biller Matudenarce
81541 National Bond&Trust 2.471.52 U.S.Smangs Bonds Payroll Deductions
81542 Nickey Petroleum Co.,Inc. 6.424.77 Oil
81543 OCEA 587.49 Dues Deduction
91544 Onmet,me Distributors,Inc 298.29 Mechanical Parts&Supplies
81545 Orange County Sheriff &5.W Wage Gamishment
81546 Pecific Supply 21.28 Mechanical Pans It Supplies
81547 Palrot Video Productions 370.89 Vdm&Editing Services
81W PCS Eigreas.Inc. 22,46 Courier Senior
81519 Peace Officers Council of CA 1.512.00 Dues Deduction,Supervisors&Professionals
$1550 Pod Supply 17.60 Hose Clamps
81551 Prom"Source Olsfion Furnishings,Inc SM.% Office Fumiture It Mnc.Equipment
81552 PROPIPE 4.337.42 Sewemne Cleaning-City of Tustin&Unincorporated County Property
81553 PSI 1,831.75 Heavy Duty Pressure Washer
81554 SBC Long Dow. 1.401 Long Distance Telephone Services
815m SBCIMCI 2,726.93 Telephone Services
81556 Scope,Voice&Dow,Inc. 2.21,419 Telephone Syatem Maintenance
81557 Sea Clothing.Natural Hisimy Books 178.00 Publications It Books
81558 Sharelerk Sales&Engineering M&SD Mechanical Pat&Supplies
81559 SM9Peth Seminars 299.00 Training Registration
81660 Court Omer ni.50 Wage Garnishment
81561 SoBdmice Com, 426.69 Spflwae Ma80ermoce&Support-Selarwmds Enginen.Edition
81562 Southern Cati mica Edison 28.19 Power
81%3 Severn Trent laboratmtes.Inc. 270.00 Lab Analytical Service
81%4 Summdsteel 1AW.84 Metal
81565 The Walking Man,Inc. 400.00 Public Notice Printing&Mailing Services Varipus Projects 7-21
$1566 Thermo Electron Cmp.-Infmmetics Div. 12,424.68 Saft re Maintenance&Support-Atlas
81587 Thompson Industrial Supply.Im. 18767.05 Mechanical Parts&Supplies
81568 Tnmea Community News 1.11875 Notices&Ads
81569 TPC Training Systems 450.00 Training Registration
81510 US Filler Corp. 250.00 Servie Agreement-DI Water Systems at Plants t&2
81571 ULme 345.40 Truck Pam&supplies
81572 United Parcel Service 2,10215 Parcel Services
815T3 United Way 150.00 Employee Contributions
81524 Vatican Caf ernia 81.29 Telephone Services
81525 Vision Semm Plan CA 9.957.96 View Service Premium
81576 VWR Scientific Products 564.85 Mineral Oil
81577 Waters Corporation 3,680.Oo Training Registralion
91578 Vlbckplece Resource 3W.75 Task Light
81S79 Xerox Corporation 17,740.50 Copier Lease
81580 VCA 4,800.00 Training Registration
IItlaNY NXfJ1.WVAW+SM6YWru Pan WprtwolYJaGmram neport-osalw EXHIBIT
k✓L1a! Page 80113 atumoe
Ckpm Paid From 05116106 to OMI31106
Warrant No. Vendor Amount Description
51551 Cmat Order M97.50 Wage Garnishment
81582 Zimmerman Yacht Maintenance 146.00 Repair&Maintenance Service-Ocean Monitoriig Wrest Nausea
8103 I-SM-Conhrence(R) 86.60 Telephone Conference C8115
81584 3E Company 10,510.00 3E On-Lime MSDS(Male dial Safety Data Sheet Management)
81585 Deirdm E.Bingmen 318.06 MeelmgRreining Expense Reimbursement
815M Jeans M.Fields 115.00 Mealmglpmining Expense Reimbursement
51567 Andrei loan 198.78 MBeumpffraining Expense Reimbursement
81688 Peal Loehr 18.87 MeetmgRraining Expense Reimbursement
81589 Ludoph T.Lorimer 1,149.66 Meefmgrtmining Expanse Reimbursement
81590 Purvi R.Past 54.00 Meelgg/Thaming Expense Reimbursement
81591 Kevin R.Peckham 130.00 Memvg/Treining Expense Reimbursement
81592 Balechendra P.Rao 143.78 MeetmglTmining Expense Reimbursement
81593 Roy J.Reynokis 0.00 Meeting/Training Expense Reimbursement
81694 James W.Silva 284.98 MatingyTmining Expense Reimbursement
81595 Lawrence A.Wginghm 130.00 MestingVmining Expense Reimbursement
81596 Kabob Express 213.95 Mating Expenses
81597 LA Chemcal 1,11M.46 Bleach
81598 A W Chestenon 13,216.35 Mechanical Parts&Supplies
81599 American Water Works Association W.00 Publicetpns&Books
81600 Abalix Emimnmental Corp. 1,110.15 Hardware
81601 AccaStandard 13TOO Lab Pads&Supplies
$1602 Adamson Industries 438.33 Lab Pans&Supplies
81003 Alrges Safety,Inc. 3.0116.29 Safety Supplies
81604 AM Consulting Engireom 10,350.00 yedda.slonel Sansone-Pen-Tana Dig Alen Tedmidan
81WS Missed.Inc. 50.99 Egonemk:Compulkr Supplies
81606 American Air firms 3.900.00 Trawl Services
81607 Ashamed Fidelity Assurance Company 344.40 Employee VOWntary Cancer Insurance
81WO Analytical Products Grou,Inc M6.00 Lab Parts&Supplies
81609 Applied Industrial Techrwfogy 26.29 Mechanical Parts&Supplies
8161D Archie lW.Inc. 4,345.00 Asphalt Repairs-Plant 2
81611 ATCC(American Type Culture Collector) 108.60 Lab Pens&Supplies
81612 Baker Tanks 560.00 Tank Ransoms
81613 BMIery Spedaltss 943.59 Ballerina
81614 BEGBuiMing BIectronfo Connote,Inc 1,395.41 Fire Nam System Maintenance,Repair&Quarterly Inspection
81615 Bush&Associates.Inc 9,124.00 Professional Samovars 7-36
81616 Chem-Tech Intemationel,Mo. 59.65 HydmcMenc Acid
81617 Cal(3lass,Inc. 1,501.85 Lab Pads;&Supplies
81618 California Recreation Company 2,574.02 Boal Slip Rental Fees for Ocean MOMomg Vessel Neuese
81619 Ca6rd,Inc. 10.612.41 Stem-Nut Assumbhy.Valve Assembly&Misc.Mechanical Pans
81620 Camillo Engineers 1,719.32 Prof nesnal Services P2E0
81621 CCP Industries 9.900.10 Jan0orial Supplies
81622 Columbia Analytical Services,Inc. 2.430.00 Analysis Of Washanuder.Industrial Wastewater&Biosolids
81623 Common Concepts 1.472.15 Compuler HaidwrrelSoSwere-De1mre BOard&Emergency Management ICS Package
81624 CompuCom Systems,Inc. 407.30 Computer Hardwarel&oeware
81625 Consolidated Elect Distributors,Inc 1.744.82 EbGucel Parts&Supplies
81625 Consumers Pipe&Supply Co. 6.888.1 O Plumbing Pens&Supplies
8162T Corporate Express 602.92 Office Supplies
$1628 Courtly Sandakan District No.2(LACSD) i&995.1D OCSD's Share of" o Drugs Down the Drain'Pharmaceutical Out eadi Program
81629 Counly Wholeale Electric Co. 4BS.72 EMdnal Perms&Supplies
81630 CWEA Conference 140.00 Matitg Registration-Division 850
81631 CWEA Membership 100.00 Membershp(CeIK.Water Favimmment Assoc)
81632 CWEA-TCP 43.00 Membershp(Cast Water Envimmment Assoc.)
Htl4NM11FXG'PL4YVNAPMNRE'Llehro Ptll nwt'Obm'Lmnvwe nwvr 1aalJA EXHIBIT B
Nvxtot< Page 9 of 13 an V4X1e
Claude Paid From 051161116 to 05131M
Warrant No. Vendor Amount Dascdpnan
81633 Dagger Tire Co. 2,453.13 Track Tres
81634 David's Tree Sernce 3,000.00 Tree Mount Service
81835 DOB Engineering.Inc 1,750.00 Professional Services-Grant Management
81635 Del Mar AruyHcal 4,810.00 Analysis of Bi0solids
81637 Depadmem of Consumer Affairs 125.00 Membership
$1638 Demo Computers.Inc 1.325.00 Computer SoBwa is Hanheom VAX Workslawn
81539 Dunwoi LLC. W9.30 Venkle Decals
81640 Dwyer Instruments,Inc 155.82 Insbmment Pads&Supplies
a1841 Electrical Selea,Inc 871.49 Electrical Parts&Supplies
81642 Employee Benefits Specialists.Inc 835.25 Reimbursed Prepaid Employee Medical&Dependent Care
81643 Enchanter.Inc 4,500AD Closed Mondonn9&Consult Inspection&Mainlenance
BIW ENS Resources,Inc. 10,000.00 Professional Services-Legislative Advocebc
81645 Ewing Irrigation Industrial 404.26 Landwape Imitation Pads&Supplies
01646 F.H.Pumps 60.98 Pump Parts&Supplies
81847 F&J Seually ProduUa.Inc. 937.68 Lab Pads&Supplies
81648 Find American Real Estate Solutions 782.00 On-Line Orange County Property Information
81649 Fisher Scientific Company,L.L.C. 8.284.93 Lab Pads&Supplies
61650 Forked Engineering&Surveying.Inc. 3.021.75 Surveying Samiras-Various Capitol Projects
81651 Franklin Covey 58.82 Office Supplies
81652 Frys Electronics 708.33 Computer Supplies
81653 Fuller Truck Amsscries ge8.e8 Trunk Pads.Toys&S.,hes
91654 City of Fullerton 174.35 Water Use
81656 Gotland Manufactunng Co. 1,184.96 Mechanical Pads&Suppose
81555 Gonad Callahan Company 1.165.46 Chemicals
81657 Geomalrix Consullants.Inc 13.1110.00 Soils.Concrete&Other Malamute Testing 141
81658 Gefings Cas0s TWIL28 Lab Pads&Supplies
81669 GoMemvesl vMndow Service 380.00 Groundskeeping Sernces
81660 Grainger.Inc. 1,830.19 Ebcrrical Pads&Supplies
81661 Gmyber Electric Company 399.27 Cable
81662 Greet Western Sainsbury Supplies 191.95 Janitorial Supplies
$1663 Hagemeyer North Amerce 1W.33 Prescription Safely Glasses
81664 Harold Primrose Ice 80.00 lots For Samples
81WS Harrington Industrial Plasbice.Inc. 1.322.48 Mechanical Pans&Supplies
81666 Hi Standard Auomotive $4.91 Automotive Pads&Supplies
81657 Home Deppl 352.92 Mac Repair&Maintenance Met enal
81668 Hopkins Technical Products 4,012.59 Mechanical Pads&Supplies
a1669 Hone Express.L.L.C.doe Pinek Santa Am 474.80 Installation of Hose&FiBings on Pump
81870 Hub Auto Supply 2,083.25 Verde Pads&Supplies
81671 City of Hunlirglon Beach 13,195.53 Weber Use
81872 Industrial DisNbubc.Group 2.555.36 Mectnnteal Pads,Supplies.Locke Tools
81873 Interstate Batteries of Cal Coast Battle Ba0anas for Vehicles&Cade
61674 Inuensp Systems,Inc. 3,702.47 Instmrcent Pads&Supplies
81675 barman Pena&Services 484.48 Fillers
81676 J&B Auto Pans WAS Auto Pans&Supplies
$1617 Jays Catering 1.239.73 Meeting Expenses
81678 Johnson Assocleles,L.L.C. 10.530.00 Professional Services-2006 Reclassification Requests
81679 Johnstone Supply 375.29 Water Hester
81680 JPL Compressor Service,In. 1,484.60 Gas Compressor Pans&Supplies
81MI Hell,Paper 4828 Paper
81682 Xforce.Inc 3,828.00 Temporary Employment Services
81683 Kiesel Environmental Lab 136.80 Outside Laboralery Services
81684 Mainfelder.Inc. 170.00 Soils,Concrete&Offer Materiels Testing
X:WPY.n`E%CFL41aV3PM6XVIE'4Wmr tut eePN'➢9411 .Pant sect-o331a9 EXHIBIT B
awttwx Page 10 of 13 ed aooa
Claim Paid From OSI16Po6 ta 0551N6
warrant No. Vendor AmouN Description
81685 to CAD Corporation 1.100.00 Training Regiatrelbn
81686 LOWER S.S18.45 Professional Service-DART M09-2 -99
81687 Lucas s GourmM Foods.Inc. 130.00 Meeting Expanse
Bless Man,.,Professional 3,82a.00 Temporary Employment Services
81689 Ms.. neracfive 1,000.00 Conference Registration-Divslon NO
81690 Malheson Tri Gas.Inc. 1.358.05 Lab Pars&Supplies
81691 Medlin Controls Co. 1,969.92 Instrument Pans&Supplies
81692 Mission Uniform Service 226.23 Unibrtn Rentals
61693 N.Glantz&Son,Inc. 515.78 Reflective Tape
81694 NaHabil&Asaccatas.In. 1,275.00 Training Registration
81695 Real Supply Co. 852.59 Plumbing Supplies
$1696 New Horm ods.C.L.C.of Santa Ana 1.400.00 Training Registration
81697 Newark Electronics 788.29 Electncal Pans&Supplies
61698 Ninyo&Moore Corporate Accounting 2,358.00 Professional Services-Soils,Concrete&Other Materials Testing Pt-37
81699 The Norco Companies 348.44 Mail Delivery Service
61700 OOB Riprographicz 264.68 Printing Service-MO 1126MO
81701 Of Depot Business Services Dbision 3,430A9 Office Supplies
81702 Olmn Constrvctlon,Inc. 9.754.00 Conalrucllon P2.82
817M Omega Influential Supply,Inc. 1.133.16 Janitoral Supplies
81704 Orrasource Distributors.Inc. 1,410.40 Eleclrical Pest&Supplies
81706 Orange Fluid System Technologies,Inc. 412.65 Plumbing Pads&Supplies
81706 Oxygen Service Company 698.75 Lab Pans&Supplies
51707 PAC 619.49 Lab Pans&Supplies
61708 Pedfic Mechanical Supply 776.60 Plumbing Pads&Supplies
51709 Peerless Wping Materials Co. 470.65 Ja edural Supplies
a1710 PFE lntemalional.Inc. 631.93 Ink Ca fridges
51711 Pt.Haan Company.Ix, 183.87 Filters
61712 Power Electra Supply Co.Inc. 50.48 Eeceral Past&Supplies
81713 Pre-Paid Legal Services.Inc. 503.25 Employee Voluntary Legal Service Insurance Premium
81714 Primary Source Office Furnishings,Inc. 8,198.15 Omce Furniture&Mai Equipment
81715 PROPIPE 9,11111.46 Baseline Cleaning-City of Tustin&Unincorporated County Property
81715 Prudentiel Overall Supply 2,950.20 Uniforms&Related Articles
81717 Pyramid Fence Company.Inc. 200.00 Fencing Repairs
81718 Relieslar Lie beurance Company 7,843.64 Voluntary Life,Cancer&Supplemental Short-Term Disability Insurance
$1719 Rainin Instrument L.L.C. 176.56 Lab Pads&Supplies
81720 Red Valve Carmelo,Inoorporaed 1,633.16 Mechanical Pane&Supplies
81721 Reslek Corp. 1,015.57 Lab Pans&Supplies
61722 RMS Engineering&Design,Inc. 1,020.00 Engineering Sernces 1`24i6.3
01723 SCAP 3.000.00 OCSO's Share-Kem Count,Litigation Fund
81724 Schwirkl Blamed 44.94 Mechanical Pane&Supplies
151725 Bass BIN Electron®,Inc. 103.50 Lab Instrument Maintenance&Calibration Services
81726 Seaventures 2,166.15 Ocean Monitoring
$1727 Shamrock Supply Co.,Inc. 5,559.19 MC niral Pare&Supplies
81728 Shunduck Saes&Engineering 280.05 Mechanical Pans&Supplies
81729 Siemens do Jensen Instrument Co. 3.387.42 Imbedded Parts&Supplies
817M SKC Weal,Inc. 6,818.05 Seely Supplies
81731 SmaNen Supply Company 54.84 Plumbing Pans&Supplies
81732 Sollcicce Carp. 8,124.03 SMware
a1733 SPEX Cenipep,Inc. 309.72 Lab Pans&Supplies
817M Summit Steel 114.97 Metal
81735 Sunset Ford 86.85 Vehicle Pads&Service
81736 Sunset Industrial Pals 148.70 Mechanical Pads&Supplies
X drann FJICEL Pab Rei-Msll EXHIBIT
mrP11Mc Page 11 of 13 mla2009
Cbkes Paid From O11118106 W U131M
Warrant No. Vander Amount Description
81737 Systems Solution Domparry 8,178.08 Repairs&Maintenance Services-Access Contrplfi Security System
51738 TekSystems 7,917.00 Temporary EmpMymenl Services
$1739 The Standard Insurance Company 2.1120.23 Execulive Diesbilty Insurance
8170 Thompson lnduudal Supply In . 10,865.18 Mechanical Parts&Supplies
01741 Tongs Lock&Safe Service&Saks 205242 Locks&Keys
81742 T..( 3.752.81 Instrument Supplies
81743 Truly Consultants,Inc 699.OD Training Registration
81744 Truck&Auto Supply,Inc 1,170.61 Automotive Pads&Supplies
81745 Tuff Sun 2.ae0.00 (8)Spray-In Truck Bed Liners
$1746 US Filler Cpm. 4,002.92 Serece Agreement-DI Water Systems at Plants 1&2
81747 UC Regents 8,520.02 Professional Seances-Strategic Process Study Research Project
81748 Ulbe Scientific 121.30 Lab Pads&Supplies
01749 UndegrouM Service Aled of So.Cold 1.774.40 Membership-Underground Unity MenlifirationMotificalion Service
61750 The Unisource corponalton 2049.44 Once Supplies
81751 United Pacific Services Inc. 1.226.00 Landscape Maintenance
al752 United Parcel Service 43.64 Parcel Services
81753 Untied Pumping Service 1,541 Pumping Service
817U VOpexlnc. 2,792.00 Pumps
81755 Verson California 714.22 Telephone Semces
81755 Verdes Numbing 1,015.00 Service Contract-Testing&CM.BeckBOW Devizes at Phs. 1&2&Pump Sle,
81757 Vortex Corp. 1,229.95 Sis Ex8 Gab Repairs
$1758 V WR Scientific Products 5,576.34 Lab Pelts&Supplies
61759 The Wackenhut Corporation 4.071.54 Security Guards
81760 Waters Corporation 2.147.75 Lab Pads&Supplies
81781 Webw Scientific W4.32 Lab Pads&Supplies
81762 bleat Coast Analytical Service.Inc 265.00 Outside Lab Services
51763 bleat Lite Supply COmparry.Inc. Si Electrical Pads&Supplies
111764 Wasters States Conlmis 196.66 Instrument Pads&Supplies
81765 W hand Supply,Inc. 741.32 Numbing Parts&Supplies
81766 Wcrklorce SoBwere,Inc 6.000.00 Professional Services-J-104
81767 Xyon Business SolNions.Inc. 9.720.00 Temporary Employment Services
81768 YaMuChese Materials Handling.Inc, 1.212AS Electric Can Paris
81769 CMifomb Bank&Trust 5.903.00 Consumption J-33-IA,Retention
01T70 Orange Community Bank 1.W.00 Construction P242,Robinson
81"1 Torrey Pines Bank 9.067.20 Conalnuction P1-T8,Rmeniton
81772 Wastem Pump,Inc. 9,651.2D Construction FE05.34
81773 Jose C.Ambno 86.26 MCObinglTdoning Expense Reimbursement
51774 Layne T.Bernei 187.10 Mesling/Traming Expense Reimbursement
81775 Samuel L.Mowbmy 616.34 Meeling?ralning Expense Reimbursement
BO78 Denlel R.Tremblay 106.25 Meeting?bining Expense Reimbursement
61T7 County of Orange Auditor Conbolbr 16,090A9 Reimbursement Agreement-Street Resurfacing Compact
B17T8 Orange County Sanitation District 1,225.21 Perry Cash Reimb.
81M South Coast Air Quality Management Dial 1,541.34 Permit Fee-Carbon Odra Control System at Pit.2
a1760 The Public Retirement Journal 320.00 Training Registration
81781 Basic Chemical Solubbns.L.L.C. 26.305.43 Sodlum Bisulfte&Sodium Hydroxide
81792 Mort&Vernon Corporation 628,947.48 Ergbreering Services Pt-102& kl00
81783 Brown&Caldwell 380.432.34 Professional Services P2-90
81784 Camp Drerssar&Motion.Inc 90,316.39 Engirreenrg Service J-714&P147
51785 EaM Tech,Inc. W.M.63 Professional Services P1-100
B1766 Hill Brothers 3&110.69 Chericela-Odor&Corrosion Control-Newpod Tmnkl'me
81787 IPMC do Parsons 1,017,937.W Engineering Services-Integrated Programlocaict Management.Temporary Busing,Mat L&Supplies
81788 Kemimn Companies,lrc. 97.431 Ferric Chloride
H itep rnrE%CEl.G1eVffiA➢yVAE`491me Pon ReponW 0Mkdn a PW Repo-0531tl UHIBIT B
a ni Pepe 12 of 13 e14di
Clalma Pala From e51161116 to 05131/06
Warrant No. Vendor Amount Description
81789 Lea&Ro,Inc. 36,988.55 Professional Servces 549
9179D M.J.Schiff and Awocbbs,Inc. 27,927.02 Engineering Services J-105&Cathodic Protection Survey
91791 Malcolm Pirnfe,Inc. 247,105.18 Professional Baby.P240&1.10
01792 MMLife Life Insurance Company 35,909.87 Group Life,Manager Add'I.Life.Shod&Long4mm Disability 8 Optimal Term Lib Ins.
81793 NRG Thermal SeMcee,L.L.C. 296,730.00 Cc.WOlon J-79
817N Pioneer Amedces,Inc. 110,457.97 Sodium Hysochlorite
81796 Pointy.,Inc. 36,684.80 Canonic Polymer MO 3-1142
WOO Synnm West,Inc. 273,899.40 Residuals Removal MO 3.29.85
81797 Tube RanchlMagan Forme 257,993.27 Residuals Removal MO 3-29.95
81798 US Metro Group.Inc. 30,172.50 Ja omal&Floor Mainumance a1 Plants 18 2
81799 Amemn International 8785379 Construction 1-24
81800 ARE.Inc. 527,928.30 Construction 7-35.7-39&741
81801 Delks B Sons Constructions.Inc. 83,208.60 Conalruction P2.683
$1802 Demmer Engineering&Construction 54,000.00 Construction P2.883
81503 Fleming Enytronmentel,Inc. 37.512.00 Construction FE0532
$1004 J F Shea Conetruclbn,Inc. 7,524,039.01 Corstradi0n J-77.P246&J-35.2
81805 J R Fifenc Conalructlon 2,131,094.40 Constmcion PI-82&Pt-76
61808 Mengets Construction.Inc 524,400.00 ConaWction P137
81807 Movuw Meadom Corp. 1,12040.00 Cpnslmdlon P247-3
81808 Soulhem Contracting Company 112,161.00 ConaWUion J-33-IA
81809 Union Bank of California 55,65870 Construction 7418736,Retention
Total Accounts Payable-Warrants E 30,063,639.17
Payroll Disbursements
33395 - 33475 Employes Paychecks E 139,668.41 Biweekly Payroll O5124MS
33476 - 33486 Employers Paychecks 14732.51 Inledm Payrolls-Voids,Reissues.Reba&IDEA Checks 5122106&5125106
126185 - 128734 Direct Counts Statements 1,149,242.68 Ehveekty Payroll OU24MO
Total Payroll Dsbursements E 1,30].833.80
Wire Transfer Payments
OCSO PWmll Texas&Contributions E 655,905.61 Bhyaekly Payroll OW4108
US Bank 476.874.93 Series 2000 A&B Refunding COPS May Interest Payment
Total Wirt Tranafrsr Payments E 1,1]27B0.54
Total Claims Paid 06110106.0641 m8 E 32,520,553,31
M wkskyn41XCEL EraQa SIrARE1C41mr N d ne,vd e71C41mt PeM Rerot.M3146 EXHIBITS
nM1mc Page 13 0113 M1y2yp
BOARD OF DIRECTORS Meeting Dale r,Bd 010
7` AGENDA REPORT em Number Item Bomber
Orange County Sanitation District
FROM: Lorenzo Tyner, Director of Finance/Treasurer
Originator: Lenora Crane, Executive Assistant
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION
DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
CONFLICT OF INTEREST NOTIFICATION
Pursuant to Government Code Section 84308, you are required to disclose any
campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving the Orange County Sanitation District. Further, you may
not participate in the decision making process to award a contract to such party.
For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with the District.
In general, you must disclose the basis of the conflict by identifying the name of the firm
or individual who was the contributor.
For the specifics of Government Code Section 84308, please see your Director's
Handbook or call the office of General Counsel.
SUMMARY
See attached listing.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
N/A
H WM1p.nd.�dApx Mq 92Ct88a,d MOma B T9.M P.pa IWNW. 0Cl. ePaa.Erc
RMva. 01MM Page 1
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. Copies of Claims Paid reports from 06/01/06 to 06/15/06 and 06/16/06 to 06/30/06
R N.plV .d/pp^Ea R.ds.p �dM 11 .R.p 111.W-8 Cb ,1.M Mc
R—.d dip./[b Paget
Claims Paid From 06/0110610 06/15106
mrant Vendor Amount Description
Accounts,Ps,yabfe.Wamane
81010 Brown&Caldwell 6 263.457.34 Professional Services,P2.91
81011 Fluor Enterprise.,Inc. 25,772.55 Eagmeering Services J44
81012 l(emlron Companies,Inc. 59.235.20 Ferdc Chloride
81013 Pioneer Amerkw,Inc. 09.480.03 Sodden Hypochlors.
81014 Southern California Edison 66,100.59 Power
51015 US Peroxide.L.L.C. 51.924.97 Odor&Conosion Control Treatment for Call.Sys.•Hydroyee Pero.Ms
51816 Victor Born GMC Truck 134,658.64 (8)2D06 GMC1Chei Canyon Eslwded Cab Pick-Up
61617 Orange County Sanitation District 27,109]6 Vbrd is Comp.Round.
51518 AanOemas Instruments 915.19 Internment Remains&Maintenance Seminole-Coastal Monitoring Baby
81819 AiMas Be".Inc. 812.24 Safely Supplies
81820 Ancon Marine 23.987.03 Ha2ardcus Material Disposal Service.
81621 Association of CalB.Wafer Agendas 640.00 Meeting Registration-Driveled 110
$1822 Association of Compost Producers 10.000.00 Membership
$1823 AT&T Universal Biller 1,029.01 Telephone Semis
81624 American Telephone&Telegraph Corp. 268.22 Telephone Service
81825 BaalC Chemical Solution..L.L.C. 2.601.84 Sodium Biaulfite
81828 BMC Business Machines Consultants.Inc. 240.00 Repair&Maintenance Services-Toner Cartridge
81827 Court Trades 98.62 Walla Gamishmenl
81828 CinBula-Wrele6s/gnima 407.02 Wheless Service.
81829 City of Casts Mesa 6,000.00 Constradiion-Sidawelk Repairs aI College Ave.Pump Station
81830 Compressor Components of CalBorma 8.721.00 Repair&Maintenance Semces-Cmis LSVB Ignition
$1831 Consolidated Elect Deldbulon.Inc. 239.20 Electrical Pads&Supplies
81832 Consumers Pipe&Supply Co. 2,298.68 Plumbing Part&Supplies,
W833 County of Orange 13.50 4Ww Gamishment
81834 County of Orange A.d4m Controller 200.00 Encroachment Permit 741
81835 County of Orange Auditor Controller 1.137.50 Encroachment Permit 7-36
818M County of Orange Auditor Controller 437.50 Encroachment Permit 7J6
$1837 CVVEA Membership 100.00 Membership(Calif.Water Environment Assoc.)
81838 Dal Mar Analytical 284.00 Analysis of Bioudds
81839 Dell Computer 2.154.79 (20)Cenndge Toney
Blue ComprwM of Child SuRaon Services 300.00 Wage Garnishment
81MI Down Pumps&Pads.Inc. 5.976.00 Mechanical Paris&Supplies
81642 Don Grayson,Ph.D..Consulting 13.613.00 Proles.ioml Management Consultiag Services
61843 Elache Bond.Inc. 20.984.31 Repair&Maintenance Senicas-Filler Press Rollers
81644 Elecrcal Sales.Inc 877.49 Electrical Pads&Supplies
81845 Employee Benesns Specialise.Inc. 10.193.26 Reimbursed Prepaid Employee Medical Is Dependent Care
81846 Employers Group 950.00 OnSBe Training-Commumcafng Vieth Diplomacy
$1847 Court Order 420.00 Wage Gamishment
81848 FEDEX Corporation 244.37 Freight Services
al849 Fisher Scienkfic 37.94 Lab Pads&Supplies
81850 Franchlse Ts,.Board 134.99 Wage Garnishment
$1951 Frya Electronics 17.15 Computer Supplies
81852 Gatlend Manufacturing Co. 951.36 MecMnicel Pane&Supplies
81853 Grainger,Inc. 15.20 Mechanical Pan.&Supplies
81954 Mall clo Ponlon Industries 1.893.48 Lob Instruments paper&Maintenance Services
$1555 Industrial DieMbgliod Group 1.062.28 Mechanical Pad.,Sugar,.Lochs&Tools
$1556 V ed Check - -
SIBST Internal Revenge SOrviee 125.00 Wage Garnishment
N:wpw`Exca.msamw9H48aYmmsPw a apmnw ms um amm-WIS-06 EXHIBITA
angles[ Page 1 of B ygpgpty
Cleime Paid From 06101106 to 06I15N6
Washing No. Vendor Amount Description
81056 Ing.Union of Oper.Eq.AFL CIO Local 501 4,569.19 Dues Deduction
81859 Irvine Ranch Waiter District 7.21 Water Use
$1860 Jobs Available.lx 142.80 Nolkes&Ads
81861 LASCONCO 312.50 Lab Pens&Supplies
81862 Liebed Cassidy 2,936.80 Prole nJorml Service-Human Resources
veto court Order 150.00 Wage Gamishment
81864 Lyon Mdo6xce Products 8,188.91 (2)Welded Storage Cabinets ate Shelving
slow Malcolm Plinio.Ine. 5,150.15 Professional Services 1-24
aided McMaster Cam Supply Co. 697.78 Machamcel Parts&Supplies
Stood MCPwk Dodge of Anaheim 10.88275 (1)2006 GMC 4-Peasenger Sitcom Vehicle
alms Megger 1.360.00 AVTS&Pulse Master Extended SoBwere Support Program
Blow Midway Mfg.&Machining Co. 8,566.13 Repair&Maintenance Services-Sell Drive Rollem
81870 COW Order 225.00 Wage Gemishmenl
ala71 NALCO Company 11,616.84 Anionic Polymer Tote for Polymer Trials&Testing at Pit.2 Primary options
81072 National Assoc,of Clean WMer Agencies 200.00 Membarship
81873 National Bond&Trust 2r460.28 U.S.Savings Bonds Payroll Deductions
81674 Ni,.Plumbing 111.37 Plumbing Pads&Supplies
81875 OCEA 565.24 Dues Deduction
81876 Orange County S"M 85.W Wage Oarnishment
111877 Peace Officers Council of CA 1.512.00 Dux Deduction,Supervisors&Pmfe..Icings
a1878 PFE International.Inc. 1,265.46 Faller-Inse ter Equipment Maintenance Agreement
81879 Postmaster 116.00 Pool Office Box Rental
a18B0 Prentice Hall Direct 99.43 Publkation
81881 RSF Cansulting 13,902.33 Engineering Services 7-38
81882 Red Wing Show 73.53 Safety Shoes
81833 RS Hughes Co.,Inc 129.20 Point Supplies
81W Sargon Engineering Inc. 725.00 Repair&Maintenance Services-Pump Out Baker-Gisler Air Jumper Manhole
81w5 SBCRdCI 766.35 Telephone Sorvicea
slow Schwitg Brown 5,242.a5 Mechanical Page&Supplies
81887 Court Order 721.50 Wage Gamishmont
B1w8 Spec Services.Inc. 18,720.23 Engieeering Services J433-1
81882 Summit Steel 1.107.03 Metal
$1590 Systems Solution Company 899.52 Repairs&Maintenance Services-Access ConlropCOTV Secuny System
81891 The Orange County Register 2,042.24 Notice.&Ads
81892 Thompson Industrial Supply,Inc. 3.322.89 Mechanical Pads&Supplies
81893 Time blamer Communication 51.07 Celle Services
81894 Times Community News 350.00 Notices&Acts
8180 The Unitaurce ComoMlion 147.72 Office Supplies
81896 United Pmcel Servos 100.16 Parcel Services
81897 United States Fruit Service 5.000.00 Postage
81698 United Way 150.00 Employee Contributions
$1099 Vermon California 167.29 Telephone Services
eight Water Environment Federolipn 182.00 Membership
81901 VJEF 144.00 Membership
81902 VJEFTEC SWAID Training Registration
$190 Vele/Chase MateNls Harder ,Inc 84.85 Electric Cad Paris
81904 Court Order 597.50 Wage Garnishment
81NS Layee T.Berohli 215.10 MeetingrTminhq Expanse Reimbursement
8190s Peter H.Brown 170A0 Me ttinglTraining Expense Reimbursement
XW hOrTXCE.dbQXMG RE1CWms PaW ReoorD CWImr Po!i ReW-01-15 EXHIBITA
sorstwie Page 2 of 6 fym*00E-
Claims Pala From 06101106 to 06MSMG
Warrant W. Vendor Amount Description
81907 Rlchad A.Casgion 1,22d.19 Meelingrieining Expense Reimbursement
81WS Robert P.Gannets 1,577.34 MeeBnglrrainiig Expense Reimbursement
81909 Latina J.Mi ig r 1,020.73 Meetinglfminirg Expense Reimbursement
81910 Marc A.Larsen 190.00 Meatingf1frainiW Expense Reimbursement
81911 Jamiann Guests 138.08 MeelmgrTraining Expense Reimbursement
81912 Kurt M.Rather 170.00 Meelingyyraining Expanse Reimbursemem
81913 Donald 8.Van Voorsl 95.00 MeetingRraining Expense Reimbursement
81914 Aanderas In9tmmenl8 4.601.37 Monitonrg Buoy Preparation&Deployment Field Servce Trip Dec.20(15
$1915 APT US&C 249M Membership
81916 Employee Activity Corrmilke 447.00 Service Ased Expense
81917 Air Products&Chemicals 25,829.07 O&M Agreement Oxy.Gen.Sys.MO 8-8-89
81B1a Black&Veatch Corperetion 37,583.19 Engineering Services P1-76
81919 Blue Cross of CaMomfe 3I0,895]8 Medical Insurance Premium
81920 Bro.&Caldmil 54,862.53 Professional Services P1J7
81921 CarElock Fuel Systems,Im. 27,07.73 Fuel Cad Program-District Vehicles&MoniWring Vessel
8102 Carob Engineers 91,380.18 Professional Services P2-66
819M Deem Denml 58,625.04 Dental Insurance Plan
81924 Earth Tech,Inc. 196.853.89 Prolo sional Services P1-106&1-24
81925 GHD,L.L.C. 59,791.00 Professional Services-Asset Management Program
81926 HOR Engineering,Inc. 55.11M.55 Pmfessional Services P142
81927 Kaiser Foundalion HmBh Plan 69,993.53 Medical Miamice Premium
61928 Kemiron Companies,One. 63.733.18 Fannie Chloride
81929 Orange County WeMr D'm0ic1 61,763.30 GAP Water Project
$1930 Pre fc Fad 57.754.00 (2)2006 Fad Escape Hybrid Intellfged,4-M.4-Door.SUV
81931 Piontse Americas,Inc. 228,874.73 Sodium Hypochlorile
81932 Sancen Engineering,Inc. 37.145.00 Repair&MSWI.Sm.-Manholer aHabm;Dinowenng Air JumperalCasla Mesa,Fold&Reformed price
81933 So Cal Gas Comearry 27.124.18 Halural Gas
81934 TWe RancWagan Farms 100.4W.87 Residuals Removal MO 3-29A5
$1935 US Peroxide.L.L.C. 87.473.41 Odor&Corrosion Control Treatment for Coll.SM;Hydrogen Peroxide&Ferrous Chloride
81936 Waste Markets Corp. 39.650.93 MabR Agree.-Gril&Screenings Removal&Dgester Main Removal
81937 Vbodme Spredlin&Smart 91,089.3T Legal Services MO 7-26AS
819M Ken Thompson,Im 73,357.20 Cpnatmction 2414O
B1939 Steve P.Red.,Inc. WW3.00 Constmctidn 1-24
51"ll Union Bank of Califonua 105.22T.OD Corubucti in 1-24.Remntion
81941 LA Chemical 1.883.85 Bleach
81942 A W Chesterton 4.103.06 Mecluiniral Parts&Supplies
81943 Ablaze Group,be. 4,495.00 Sollaare Consulting Services-Crystal Environment
81944 Accounting Opti0ns,Inc 3,640.00 Temporary Employment Services
81945 A Smndad 110.T3 Lab Pars Is Supplies
a19d6 Adamson Industries 219.16 Lab Paris&Supplies
a1947 Agilenl Teclmologles,Inc 556.42 fob Pars&Supplies
81948 Air Liquids America Corpomlion 169.S7 Specialty Gases
81949 A.Filter Service 274.95 Mine!Gas Fillers
81950 Airgas Safely.Inc. 4.765.84 Safety Supplies
81951 Aigas West 8.68 Demunage
81952 Allied Peckirg&Rubber,Inc. 1,125.18 Mechanist Parts&Supplies
81953 American Express 20.060.96 PurMasing Cad Program.Misc.Suepkes&Semces
81954 Amlech ElmWr Services 1,400.00 Monthly Elevator Maintenance at PIts.1&2
81955 AM190ne Employment Service 5.381.04 Temporary Employment Services
HWept"EXCEL do'227 FS.InCens Pa4Mipvl'O9-0TCmma Paid Mixon-parses EXHIBITA
N@1px: Pegs 3 of 8 O29,000
Claims Paid From 01M)NOB to WINDS
Warren)No. Vendor Amount Description
81956 Applied Industrial Technology 34.59 Mechanical Pads&Supplies
$1957 Agwbc Bimmy and Consulting Labs,Inc, 1,1M.00 Whole Effluent Toxicity Testing
$1968 Arab Wrefess 1.023.21 Paging Service-Aldime,Service&Equipment
81959 Associated Sales and Beg Company 152.13 Lab Pads&Supplies
81960 AT&T universal Biller 584.44 Telephone Service
81951 ATCC 63.20 Lab Paris&Supplies(American Type Cullum Collection)
81962 Awards&Trophies Company 13.47 Awards It Trophies
$1083 Basic Chemical Solutions,L.L.C. C328.87 Sadlum Sloughs&Sodlum Hydroods
Blass Bebery Specialties 642.36 Batteries
BINS BC Wre Rope&Rigging 130.41 Mechanical Paris&Supplies
allies SEC-Building Electronic Controls.Inc 3.450.00 Fire Alarm System sdalmenmca,Repair&Ouadedy inspection
81967 Bee Man Pest Central,Inc. 350.00 PON Control
81968 Berendesn Fluid Power 247.84 Mechanical Pads B Supplies
81969 Berge's Demander Service 1,657.21 Mechanical Repair&Maintenance Services-Governor
81970 BMMerieux Vilely,Ine. 576.09 Lab Pads&Supplies
81071 Bondlogielix L.L.C. 2.3W.W Prof.Sam.-Preparation of Interim Arbitrage Rebate Report Re 1993 Sense COP&
51972 Boyle Engineering CMpoashm 5,03303 Professional Services 1.24
81973 Brennfeg Pacific,Inc. 2,996.67 Janitorial Supplies
81974 Cal Pension,Inc. 1,0416 Fumltum&Fixtures Installation for New Division 820 Stuff
81975 Celifemle Sentence Renal. 650.00 Barricade Ranlels&W9Msite Protection
01076 California Relocation Services,Inc. 542.25 Office Files MovingfRalocation Service.
$1977 Campbell Wntsw Tiny, 175.00 Wndow Timing-Fleet Services
81W8 Cad Woman B Co. 1.022.26 instal Claims Administrator
81979 Coaxial Gourmet 290.93 Meeting Expenses
81000 Coast Plumbing 140.00 Plumbing Services
81981 Columbia Analytical Service,Inc. 270.00 Analysis of Wasleweter.Industrial Wastewater&BicapiMs
81982 Communications Supply Carp. 134.42 Electrical Pads S Supplies
a1983 Oompreo,Components of Calibrnb 5,396.38 name&Maintenance Services-(32)Cels LSVS Ignition
81W CompuCOm Systems,Inc. 1.516.00 SoBwma&Mamlonenm Contract-Clean Access Security SOBwNe
81985 CS!Computabonel Systems 1.124.45 lietroment Pads a Supplies
519M Cone International.Inc. 2.032.50 Legal Services-Construction Management P2460
81987 Controlled Motion Solutions 494.23 Mechanical Pads&Supplies
WHO Co.",Cameron Concerned 2,394.11 Eages Supplies
81989 Consensus Express 14,445.91 OMM SuPplias
81990 CS-AMSCO 007.71 Mechanical Pads B Supplies
a1B91 CSMFO 54.00 Meeting Expenses
81992 CWEA Membership 100.00 Membership(Calif.Water Environment Mace)
61993 D.pper The Co. 318.20 Truck Time
SION Devid'a Tres Service 10.000.00 Tree Most.Service
81995 Del Mar Analytical 2,483.00 Analysts of Biosolids
aims Desed Pumps&Pens.Inc. 7.013.83 Pump B Pump Pads B Supplies
81997 Dudek B Associates,Inc. 12.034.88 Professional Services FEOS46
$1998 Dunn Edwards Contended 146.54 Paint Supplies
$1099 EfeWe Bond Inc. 4,013.69 Repair Maintenance SOMms-Belt From Roller
112000 Employers Group 712.50 On-Site Training-Dealing Win Change
$2001 Enchanter.Inc. 2,900.00 Ocean Monitoring&Cents Inspection&Maintenance
82002 Environmental Resource Associated 1,418.58 Lab Pads&Supplies
92003 Ewing Iffigamn Industrial 25130 Landscape Intgatlon Pads&Supplies
82004 FEDEX Corporation 14.71 Freight Services
HMg4MnV!%ClL4bg�4PNYAlCMMa MM BspemaaaMabn.PaM Mom-m-lBCa EXHIBITA
evllbk Page 4 cis 99vAB !'
Claims Paid From 08101108 to 08I15g8
Warrant No. Vender Amount Description
82005 Ferguson Enlerpdaes,Inc. 486.98 Valves
02005 Fisher Scientific 3,834.99 Lab Pads&Supplies
82007 FIUM Components International,L.L.C. 1,485.29 Cetlbratsn Service-MAS Fswmeler
82008 Forestry Suppliers 293.88 tab Pam&Supplies
82009 Forked Engineering&Surveying.Inc. 1,009.60 Surveying Services 5.51&542
82010 Fountain Valley Points,Inc. 184.04 Print Supplies
82011 Fountain Vail"Rancho Hand Wash 1,521.00 Vehicle Washing&W exOp Services
82012 Franklin Covey 410.68 Once Supplies
02013 Gamaft Callahan Company 4.249.12 Chemicals
82014 GFI USA,Inc. 825.00 Software License Renewal-GFI LANguard Security Event Log Monism
aXIS Golden Bell Product 8.002.50 Contractual Services-Ineembole Costing of Manholes
82018 Goldemaest Window Service 980.00 Groundskeeping Swims or Widow Washing Services
82017 Grainger,Inc. 1,157.4E Mechanical Pad.&Supplie.
0=16 Greyber Electric Company 10.99 Elacldcal Pads&Supplies
&2019 Green Perrot 117.99 Meeting Supplies 5-61
SM20 Hacker Equipment Company 1.561.59 Mrs..VeEkde,Pad.,Repairs&Sachs
$2021 HIM W Prnton Industries 441.60 Lab Paris&Supplant
BM22 HaroM Primrose ice 80.00 Ice For Samples
82023 Hanbgsn Industrial Plastics.Inc. 90.48 Mechanical Pads&Supplies
82024 Hi Standard Automotive 22.63 Automotive Pad.&Supple.
82025 Hill Brothers 15,449.76 Chemicals-Odor&Corrosion Control-Newport Tmnkllae
82028 Hub Auto Supply 248.50 Vehicle Pam&Supplies
82027 Industrial Distribution Group 3,347.90 Mechanical Paris,Supplies.Locks&Tools
82028 Industrial Mete]Supply 202,27 Metal
82029 Industrial Threaded Products,Inc. 3,480.30 Inventory Fasteners
62030 Voided Check - -
82031 Invensy.Systems,Inc. 13&73 Instrument Pegs&Supplies
82032 Jamison Eogineemg Contractor,Inc. 21,000.00 Repairs&Maintenance Services-(2)6V Valves at Pit.1 Effluent Junction Box Project
82033 Jay,Catering 1.579.75 Meet%Expenses
82034 Johnstone Supply 350.73 Mechanical Pegs&Supplies
a2035 J2 Printing Services 518.04 Printing-Forme
82036 Kebob Express 231.19 Meeting Expenses
62037 Keith Binger 5,445.00 Training Registration
82038 Kelly Paper (18.74 Paper
52039 Wage,Inc. 3785.10 Temporary Employment Semple.
82040 Klelnfeldec Inc. 198.W Sods,Concrete&Ocher Manages Testing
82041 L&N Image Apparel 681.13 OCSD Staff Jacket.wlLogo-Medical Team
92042 Lmmen Education Services 339.00 Training Reglslrallon
82043 Labels and Folders.Com 731.88 Dec.Supplies
82044 Lekas Environmental Software,Inc. 1.539.00 SOBwere-ISC-AERMOD View
82045 Lee&Ro,Inc 6.079,41 Professional Swims P247.03&FE05-20
820/8 Uxis Neale Matsew Bender 219.28 Books&Pub11ca8ons
82047 LINJER 5,589.84 Professional Service-DART NO 9.22.09
62048 Malcolm Fine,Inc. 14,882.80 Professional Services 1-10
62049 MenpowerProkasional 3.040.00 Temporary Employment Swims
82050 MrJunkin Corporation 428.05 Mechanical Pegs&Supplies
82051 McMahan Business Interior 6,352.67 Miscelkneous ONca Furniture&Fixtures
82052 McMaster Can Supply Co. 1.867.89 Mechanical Repair.Calibration&Certification
82053 Measurement Control Systems,Inc. 2.516.56 Electrical Pegs&Supplies
XVWp nN XCEL4U�NPSRPRECUimm Pald Ruch) TC41m.P.MRppN-On15m EXHIBITA
nnrzl. Page 5 of 8 sqp-ppe
Claims Paid From U6NiNe to 0611SMS
Warrant No. Verde, Amount Description
a2051 Media Resurfacing Systems.Inc. 3,200.00 MaintenanceServices-Sandblast B Clean Bell Press Pads
82055 Medlin Controls Co. 370.37 Instrument Pads S Supplies
$2056 Mid West Associale i 1,072.31 Pump Pam S Supplies
82057 Miele.Inc. 425.00 Lob Instruments Repair B Maintenance Services
620M Mission Abreahre B Janitorial Supplies 200.16 Janilariel Supplies
52059 Marlon Salt 706.41 Sao
82050 MVA Architects 2.N0.00 Professional Services-North County Yard Preferred Site Evaluation
8W81 N.Giant 6 San 162.53 RORWim Tape
82062 National Plant Services,Inc. 11,162.50 Vacuum Truck Services
82063 Neal Supply Co. $61.50 Plumbing Supplies
820W OCB Reprographics 4.221.15 Printing Service-MOI MM
82085 ON.Depot Business Services Division 1.655.57 Office Supplies
82066 01 Analytical 1,262.84 Lab Paris 6 Supplies
82067 Omega Industrial Supply.Inc. 1,134.16 Notional Supplks
82068 OMNI Western Incomoraled 25.60 Tools
82069 Oneaource DWribulors.Inc. 2,002.33 Electrical Paris&Supplies
82070 Orange County Hose Company 299.32 Hydraulic Hose Supplies 6 Pads
82011 Orange Fluid System Technologies.Inc. 1.062.00 Plumbing Paris 6 Supplies
82072 ORCO Construction Supply 95.18 Marking Paint
$2073 ORE Offshore 1.323.54 Buoy System Pale
$2079 Oxygen Service Company 3.281.49 Lab Pads.Supplies 6 Specialty Gases
82075 PAC 204.30 Lab Pens 6 Supplies
BNI76 Pacific Mechanical Supply 34.81 Plumbing Supplies
62073 PCS Express.Inc. 207.67 Counter Service
82078 PERlMSEAL 629.26 Luba Oil
82079 PL Hewn Company,Inc. 25.32 Electrical Pans 8 Supplies
82D60 Pn it Distribution.Inc. 36.96 Demurrage
112081 Prexair.Inc. 117.00 Lab Pads 6 Supplres
82W2 Primary Source Office Furnishings,In . 1,523.59 Miscellaneous Office Furniture a Fiodures
82083 Printerguy 5,234.35 Printer Maintenance
62064 Prism Business Media AN Pub0aetbn
82085 Propipe 7.270.77 SeweMne Cleaning-Cry of Tustin B Unincorporated County Property
$2006 Prutlen8al Overall Supply 2.971.98 Wn6emp&Related Articles
82087 G our Calif.Div.Pump Engineering 326.13 M.rlraniral Parts 8 Supplies
82088 Quinn Group.Inc 911.95 Oil,Air B Fuel Filters
$2089 Rainbow Disposal Co. 198.21 Trash Removal
82090 Relmal Paris&Components,Inc. 1.025.51 Mechanical Pans 8 Supplies
82091 RMS Engineering 8 Design.Inc. 2,581.25 Prokaaittral Services P2.66-2
82092 Rockwell Engineering 8 Equipment Co. 46114 Pump Parts 8 Supplies
BW93 Royal.Cleaner 6.00 Dry Claanoff Services
82094 RPM Electric Motors 614.18 Motor
82095 Rubin B Tucker,L.L.P. 2y5.00 Legal Services
820M Ryan Nano Products Corp. 523.67 Hardware
82097 Duane T.SmIM 53.75 MeelingRrMning Expense Relmbumement
02098 SARBSCVJEA 45.00 Training Registration
821199 SBCIMCI 29.17 Telephone Services
8210D Srhwing Bkael B23.46 Mechanical Pads 8 Supplies
82101 Seem Name Pale 363A0 Signs
82102 Shamrock Supply Co.,Inc 51.96 Rope
wagwnTXCELaaVMNPa1141FLWmr Asks roeTSabm M1N Rpm-ea15tl E%HISITA
snmmr Page 6 of 3 aosrmce
Claims Paid From 06101106 to 06115106
Wament No. Vendor Amount Description
$2103 Smardan Supply Company 64.58 Plumbing Paris S Supplies
82IN Snap-0n Tools.Inc. 294.67 Twer
$2105 South Coast Air Quality Mattagami Dig. 3,141.98 Chen Fceer Permit Fee
82106 Southern California Edison 3,080.91 Pow
82107 Southern Counties Lubricant 1,477.26 00
82108 Southland Envelope Company,Inc 723.01 Payroll Envelopes
82109 SPEX Carbide,Inc 609.60 Lab Pads&Supplies
82110 Stanley Steamer International.Inc. 682.00 Carnet Corning Services
82111 Summit Steel 525.39 MM61
82112 Sunset Industrial Paints 277.84 Mwhenical Paris 8 Supplies
$2113 Technical Service Group,Ina 1,381.60 SCADA System VAX Service Agreement
82114 TekSyaoms 6,531.00 Temporary Employment Services
82115 Terminix International 1,009.00 Peat Contrd
821 to The Help Canter,L.L.C. 9,000.00 Od its Training-Workplace Violence Prevention
82117 The Walking Man.Inc. Si Public Notice Printing It Mailing Serdces Versus Prosecb 7-36
82118 Rand McNally Map B Treats Sores 9.923]e Daobese 3-Year License B Technical Support-GIS Database Shape-OC:TGDE Map Viewer-OC
82119 Thompson Indpekial Supply,Inc. 0,037.53 Mecheniral Pans 8 Supplies
82120 T-Mobile 110.64 While.Air Tim,
82121 Tony'e Lock S Safe Service a Saba 123.09 Locks&Keys
52122 Trensesf 708.29 Instrument Supplies
82123 Tremw Incorporated 480.00 Roof Leak Repaint in Admin.Bldg.Engineering Area
82124 Truck 8 Auto Supply,Inc. 42.24 Auom0tive Pads a Supplies
82125 U.S.Filler Corporation 694.12 Service Agreement-Lob Purification System
821" Underground Service Alan of So.Cali/ 1,790.40 Membership-Underground Utility ldantifirathismNotificatlon Service
82127 United Pacific Sexual.Inc. 16.467.51 Landrcepe Maintenance at Plants 1 8 2 and Pump Stations
02128 United Parch Service 153.90 Parcel Services
82129 Universal SpedaNes,Inc. 27.65 Meclumucal Pans 8 Supplies
02130 The Ventoge Group,L.L.C. 1,745.00 Temporary Employment Service
82131 Vapex,Inc 3,510.00 Instrument Pi 8 Supplies
82132 Veriwn California 90.19 TelapEooe Services
82133 Vertex.Inc. 4.130.00 Software Support-Payroll Tex 0 Series
821U Vtaon Service Plan CA 9,867.88 Vision Serviro Premium
82135 Vortex Corp. 2.879.93 Gate Repairs-Ellie Aw.Entrance6 Garfield Entranca B East
621N VVVR Scientific Products 6,562.16 Lab Pans 8 Supplies
82137 Welochs,Inc. 1.485.60 Installation of Carpel at Bldg.H
82135 Waters Corporation 409.35 Lob Parer&Supplier
82139 Wage Sanitsry Supply 346.52 Janiloriel Supplies
82140 used Llle Supply Company,Inc. 1.372.23 Eocldcal Pans 8 Supplies
32141 Xy0n Bueicaes Solu ism,Inc. 6,480.00 Temporary Employment Services
82142 YallaChose Magi Handling,Inc. 1,919.40 Electric Can Pans B Supplies
62143 Yokogawa Corp.of Amence 1,981 Instrument Supplies
521" Wbdem Pump,Inc. 13,915.80 Construction FE0544
821" Catherine M.Beer 170.00 Meefingr7raining Expense Reimbursement
82146 Pater Chase 42.00 Meefing77rdning Expanse Reimbursement
62147 James E.Colelon 411.87 MedingrTraining Expense Reimbursement
82148 Sol R.DeW1Me 190.00 Medingr7relning Expense Reimbursement
82149 Thomas D.Dodderer IW 00 MedingrTrdning Expanse Reimbursement
$2150 John G.Gonzalez 42.00 Meeiingrrnimng Expense Reimbursement
82151 Hamel S.Khublall 1.258.10 MedingRreining Expense Reimbursement
.xxxismchiss.awlmmswaetcmmx Pau Rearm)SOMWers pas Rapid-06-1515 EXHIBIT A
aM1aY Page 70f 8 forpol
Claims Palo From OWIMS to 011I15108
Warrant No. Vendor Amount O...rlotlon
82152 Denise W Marlins. 28.52 Meeting Training Expense Reimbursement
82153 Cann O.Nguyen 1,054.57 MseSngrTraimng Expense Reimbursement
821U Kelly L.Ross 688.93 Meetingrrreining Expense Roundimement
$2165 Daman J.Schuder 42.00 MeifingrTnining Expanse Reimpusement
$2156 Aquarium of The Padre 171.36 Reimbursable Employee Adlvty,Expense
82157 Bruce BOrdurdl 484.18 User Fee Refund Regarding Septic Tanks
82158 Wiliam COmetl 1,163AS User Fee Refund Regarding Septic Tanks
82159 Wiliam Crag 2.952.66 User Fee Refund Regarding Septic Tanks
821N County of Grange Audtor Controls, 105.00 ACminislrmive Fee-Adjustments to Property Tax Bills
62161 County Of Orange Auditor Controller 180.00 Adrein malive Fee-A6luslmenls to Property Tax Bib
$2182 County of Orange Auditor Container 765.00 Adminisi alive Fee-Adjustments o Property Tex Bib
e2163 County of Orange Audllor Controller 120.00 Administrative Fee-Adjustments le Property Tax Bills
821" Thomas Nichdeon 1.591 User Fee Refund Regarding Septic Tanks
621SS Fred Ouintard 1,163.65 User Fee Refund Regarding Septic Tanks
02106 South Coast Air Quality Management Dist. 16,027.25 Continuing Emission Momlonng System Fees-Ph.2 Can Can Sys.
92167 South Coast Air Duality Management Dist. 9,615.35 Continuing Embslon Momloring System Fees-Ph.1 Can Gen Sys.
82168 Vernon 71.75 Telephone Service
82169 Mark&Du0e Wilda, 1,6]8.65 User Fee Refund Regarding Septic Tanks
82170 Hornet Zell 352.72 User Fee Refund Regarding Septic Tanks
82171 Veltled Check
Total Accounts Payable-Warrants 4.42��
Payroll Otsburasments
33489 - 33584 Employee Paychecks 8 136,633.90 Biweekly Payroll O6m7ai6
33585 . 335Bg Employee Paychecks 10.620.6D Interim Payroll-Retirement OM106
12W35 -127292 Direct Oeposit Statements 1,089,109.07 Byreekly Payroll 06M7106
Total Payroll Disbursements 4 1.23 .644A
Wire Transfer Payments
OCSO Payrdl Taxes&Contribupom 9 626.937.16 Biweekly Payroll 06/U7y06
Deutsche Bank 513.621 94 Sexes W06 Certificates or Participation May Interest Payment
Bear Steams Co.,Ina 6.575.34 Sense 2008 Cardinals.of Pemami110n Remarketing Fee 0318m6-03131y06
D.,%Bank 32,911.]] Sarles"Old Cer1ifimlea of Participation Commitment Fee 031=6-04130I08
JP Mogan Chase Bank 135.546.88 Series 1993 Refunding Cenificalea of Panicipetion May NOS Interest&Principal Payment
Total Wlra Tmratsr Payments 3 1,315,783.19
Total Claims Paid 06111-011I1510111 S B.W4.BW.18
HW.,urn1 vicii, eVA.S..F furs Pan aaxnkX-OT ksx—.1d a.inn.0415W EXHIBIT
X.k. Page 6 of a sow.oae
G
Claims Paid From 06114006 to 06MOr6
Vitamins Ho. Vendor Amount Description
Accomw Paeable-Warrants
82172 Lawyers T'Ne Company 6 40,000.00 Escrow Deposit-Real Primarily Purchase S-49
02173 T.I.Ranchuyl,im Farms 139.000.31 Residuals Removal MO 3-2945
92174 Dudek B Assoctams,Inc. 54,858.28 Profssional Services P248
02175 Frost Company 42,961.57 Repair B Maintenance Services-Pit.2 Solid Storage B Truck Loading Faclity hydraulic Pump Units
82176 HDR Engineering,Inc 219,994.84 Professional Services Pt-101&Commotion Permit Data Development
U177 tee S Ro.Inc. 63,921air Professional Bonn.5-51&5.52
82175 Occidental Energy Marketing,Inc. 78.537.25 Nmuml Gas for CenGenlCoGen
82179 Orange County W.I.m Distinct 6,164,686.89 Joint GWRS Project Jab
82180 Southern California Coastal Water 346.27&W Joint Poems Agreement
a2161 Southern California Edison 314,905.T6 Power
82182 Kiew3 Pacfic Co. 452925.00 Construction 5.51 Is 6.52
82183 Voided Cheri - -
82184 Wells Fargo Bank 50,325.00 Construction 5.51&5.52,Retention
82185 Absolute Standards,Inc. 538.00 Lab Pads&Supplies
8218E ACE Ergonomics 609.01 Professional Services-Ergonomic Midstation Evaluations
82187 Aigas Salary,Inc. 880.52 Safety Supplies
82168 Aernman Airlines 2.180.10 Travel Services
52189 American Management Amociabor,Inc. 1,195.00 Training Registration
82190 ARBIPERP-Air Resources Board 450.00 PortaNks Engines Permit Fee
82191 AT B T Univemal Biller 1.005.17 Telephone Service
$2192 AWSI 506,00 Department of Transportation Program Management B Testing
$2193 Bare Wells Associams 4,242.00 Professional Sernces-Sewer Rate Fee Review
821" Barre0 Smyth Lighthouse 197.52 Repay&Maintenance Services-Siosystems Monitors
82195 Coun Trustee 98.62 Wage Gamuhment
82196 California Hazardous Services,Inc. 1,720.00 Underground Sbmge Testing-S8989 Compliance
82197 Cingular Weiss.Airtime 4,594.35 Wremss Sconces
82198 CMAA 255.013 Training Registraton
82199 CSI Computational Systems 8,102.26 Soeware Maintenance B Support-AMS Machinery
82200 Consolidated Reprographics 355AT Office Supplies 8 Stationery
82201 Controlled Motion Solutions 249.61 Electrical Pena&Supplies
82202 County of Orange Auditor Controller T0.00 Encroachment Permit 7-21
82203 County of Orange Auditor Controller 6,579.00 Encroachment Pm.R Tab
82204 County of Orange AudilW Controller 420.00 Encroachment Permit 7435
82206 County of Orange A d itW Controller 141.00 Underground Sbmge Tank,Haamdous Mammal.&State Fees
82206 Cnawkw Management Solutions 5.000.00 Professional Services-Manegement Practices
62201 C.S.M.F.O 272.00 Notices&Ads
$2208 CWEA Memberekip 100.00 Membership(Cain.Water Envimnment Assoc.)
82209 David's Tree Service 425.00 Tree Maim Service
82210 Department of Child Support Services 300.00 Assm Gmmshment
U211 Eagle Aerial Imaging 9,399.25 Annals on DVDllnstallad
U212 Easy Frame Sign Comp r".Inc. 51.50 Signs
=13 E.Oxygen Technologies,L.L.C. 18,8W.OD Construction-Superog9enalion in the Collection System Project-Seal Beach Pump Station
a2214 Ecebgy Control Industries 7,183.99 Haurdous Waste Disposal
82215 Edinger Medical Group,Inc 45.00 Medical Screenings
82216 Employee Benefits Specialists,Inc. 10,770.19 Reimbursed Prepaid Employee Medical It Dependent Care
SU17 Court Omer 420.00 Wage Garnishment
SUIll Failsem 6.049.69 Repair B Maintenance Services-Femc Chloride Tank Leak
52219 Feder Corporation 201.48 Freight Services
52220 Fast American Real Estate Sdulidns INAO Cn-Una Orange County Property Inlormaoon
II Fisher Scientific Company,L.L.C. 89.64 Lab Pans It Supplies
Wn2 Franchise Ter Board 118.55 Wage Garnishment
X YHPNn1EXCFL4u9aMPbINRECwMs cap Rmannapm.aMe PeN Resort.awpufi EXHIBIT B
rmRlam Peg.t of 8 711.
Claims Paid From 06110I08 to OMMS
Warrant No. Vendor Amount Description
82223 Franklin Covey 46.00 Office Supplies
82224 Fruw Profiles 468.50 Human Resources Background Checks
82225 Geomahix Cotmulante,Inc 11,400.00 Sells.Concrete&Other Materiels Testing 7-36
82226 Graybar Electric Company 48.70 Electrical Paste&Supplies
82227 Green Pants 135.12 Meafing Supplies P2-91
82228 Hem Depol 295.58 Misc.Repair&Meimermnce Malarial
82228 HWhes Plumbing Supply 1,197.45 Plumbing Peas&Supplies
822M Intemel Revenue Service 125.00 Wage Garnishment
82231 Intl.Union of Oper.Eng.AFL CIO Local W1 4,601.60 Dues Deduction
82232 Ins..ys Systems,Inc 2,314.711 Electrical Paris&Supplies
BU33 Jamison Engineering Contractors,Inc 1,800.90 CO almucti.m S5l
BM34 Kabob Express 220.95 Meeting Expenses P1-71
82235 Kohex H2O Sdsress Ix. 2,015.65 Professional Services Pt-98
82236 Lim Ohlund Management and Tech. 3.880.00 Professional Services-0&M Manager Leadership Retreat
82237 Court Order 150.00 Wage Garnishment
822m Lea Angeles Times 08.00 Neatest.&Me
82239 Lyon Workwece Products 693.83 Storage Cabinet
M40 Mangle M.W. 249.00 Towing Services
82NI MemMutual Michel Firrimbal Group 145.41 Executive Disability Plan Premium
82242 McMaster Can Supply Co. 507.50 Lab B Maclumical Pen.&Supplies
82243 Midway Mfg.&Machining Co. 2,370.50 Mechanical Pans&Supplies
822" Court Order 225.00 Wage Garnishment
82245 National Bond It Trust 2,460.28 U.S.Srvings Bonds Payroll Deduclion.
82246 National Fitter Media Corporation 7,507.50 Filler Press Bells
82240 Neal Supply Co. 30.71 Plumbing Supplies
82248 O C Tanner Recognition Company 1,423.01 Employ.Service Awards Program
$2240 OCS Reprographics 5,277.04 Printing Service-MO 146l
82250 OCEA 604.49 Dues Deduction
$2251 Denatures Distributors.Inc. 27.35 Electrical Pans&Supplies
82252 Orange County Shand 85.00 Wage Garnishment
82253 Parsons Vdeter&Infrastructure.Inc. 21,616.22 Professional Services J-35.1
82254 Patricia Jorgensen 1,200.00 On-Site Training-Body MCManicerErgonomlcs
92255 Peace Officers Council of CA 1.630.00 Deals Deducible,Supervieore&Professionals
82256 P'welpushers,Inc. 5,691.60 Temporary Employment Services
82267 Poydy.,Inc. 18,618.14 Cationic Polymer MO 3.11.92
92250 Pont Supply 122.24 Beat Supplies-Names Measuring Vessel
52259 Process Work Injury Center 85.00 Medical Screenings
82MO PROPIPE 2.403.O7 BaselineCleaning-City of Tustin It Unincorporated County Property
82261 R L AbbWt&Associates; 3.000.00 Kam County BIowIMs Consulting Services
82262 Rainbow Disposal Co. 2,774.91 Trash Remove)
82263 RJN Group 9,720.00 Solame Maintenance Agreement-CASS
82264 Robert J.Lung&Assoc. WAS Prolemional Servieas-Aerial Photos of Pit.1&Pit.2
82MS SARBS-CWEA 315.00 Training Registration
82268 SBCI1W1CI 14.57 Telephone Semces
82267 Science Applications International 2A.054.23 Ocean Monitoring NO 6-5-94
82268 Court Order 721.50 N/e9e Garnishment
82268 SORchome Corp. 4,901.38 Bellmore
8WO Spurt Coast Air Dually Management Dist. 772.61 Ps.s Fees-Annual Emissmn.Operation&Mlsc.Fees
62271 StateNet 112.77 Publication&Books
82272 Strategic Diagnostics,Inc. 448.93 Lob Pans&Supplies
82P3 Strategic Hit 32&00 Training Regislrelion
82274 Summit Steel 3.014.79 Metal
X'YNpImnL4eV3JNp6H4eE1Clamu Pam Aait4'aalmmLmYnr Pep Rapid-pBaDCe EXHIBIT B
n�u2tanc Page 2 of 8 f�twmm
C
4
Claims Paid From OW16109 a 0613OMS
Warrant No. Vendor Amount Description
82375 Tetra Tani,Inc. 10,452.09 Envisonmentel Computing Services-Ocean Manitomg Progmm
82276 The Oarge County Register 1,544.40 Notices&Ads
52M The Solid Waste Assoc.of North America 89.00 Mauritanian
82278 The Standard Insurance Company 2,620.23 Executive Dipabiliy Plan Premium
82279 Thompson Industrial Supply,Inc 4,678.24 Mohr
82MO US Filler Corp. 1,057.50 Service Agreement-DI Water Systems at Plants 1&2
82281 United Patel Sevice 1,624.76 Parcel Services
82282 United Way 150.00 Employee Contributions
a2283 Vapex.ldc. 18,094.60 Instrument Paris&Supplies
822M Varian,Inc 4,056.15 Lab Paris&Empties
822S5 Veriaon California 28.83 Telephone Services
BMW VWR Erdontic Products 88.45 Lab Paris&Supplies
82207 Wally Machinery And Tod Supply,Inc. 276.20 Mechanical Pads.Supplies&Tools
82288 Water Environment Federation 288.00 Membership
02289 Water Environment Research Foundation 51.25 Publication&Books
82NO WEF S76.00 Membership-Water Environment Federation
02291 WGI(Water Dually.Inc) 45000 Training Registration
81 Court Order 597.50 Wage Garnishment
82293 1-9004onfererxi 445.06 Telephone Conference Calls
82294 Thomas M.Stands 121.00 Meatinglyraideg Expense Reimbursement
&NS5 WBiam D.Cassidy 116.00 MeatinglTra4irg Expense Reimbursement
82n6 James E.Colston 342.37 Meelinprrounirg Expense Reimbursement
82297 Michael T.Hawarm 130.00 Medirg/Traving Expense Reimbursement
8229E Ludwig Lupus 142.49 MeetirgRrainmg Expense Reimbursement
82299 Gay A-Pons 2,008.85 MeedngRraMeg Expense Reimbursement
U300 Ellen Ray 500.00 Meeting?rehirg Expense Reimbursement
82301 Janet K Robsts 323.96 MeednglTrainirg Expense Reimbursement
82302 Richard E.Schi Jr. 373.03 Meedngd-rahbg Expense Reimbursement
SM03 Ciy of Cypress 522.50 Reconciliation Sewer User Fee Refund Program
82304 County of Orange Auditor Controller 735.00 Administmlive Fee-Adjustments to Property Tax&14
82305 County of Orange Auditor Controller 615.00 Administrative Fee-Adjustments to Property Tax Bills
8230fi County of Orange Auditor Controller 675.00 Administrative Fee-A&justdrents to Property Tax gala
82307 County of Orange Auditor Controller 680.00 Administrative Fee-Adjustments to Property Tax Bala
82W8 County of Orange 100.00 Encroachment Pedril
82309 Gary Agoine and Frys Electronics 9T6.W Employee Computer Loan Program
82310 Michad Hearst 118.15 User Fee Refund Regarding Septic Tanks
82311 William Hundred 489.85 User Fee Refund Regarding Septic Tanks
=12 Antonio Ponce Mixtures 1,163.85 User Fee Refund Regarding Septic Tanks
82313 Richard Powwrs 1,163.85 User Fee Refund Regarding Septic Tanks
82314 Sancen Engineering,Inc. 190,332.30 Construction-Manhole Rehadd4don Project]-21
02315 Basic Chemical Solutions,L.L.C. 42,842.49 Sodium BisuM&Sodium Hydroxide
8015 Black&Veatch Corporation 1,079.2T531 Egineemig Services J-100,J-TT,J-79-1&P1-102
82317 Brown&Commit 242.987.48 Professional Services P2-91
82318 Camp Dresser&Mckee,Inc 99.346.27 Engineerrg Service J-714&P1-97
82319 Curdle Enginsers 216.549.12 Professional Services P246&Pl-Tit
82M Couny of Orange Auditor Consider 63,00.82 Admishilralive Fee-Adjustments to Property Tax Bab
82MI Driver Allied Insurance Service,Inc. 29,819.00 Annual Pollution WaemaB Insurance
li Dudek&Associates.Inc. 108,714.21 Professional Services PMa
82323 Earth Tech,Inc 179,704.11 Professional Services I-2A&Pt-100
82324 HBI Brothers 35A80.39 Chemicels-Odor It Corrosion Contol-Newport Tmnkline
Stan IPMC do Parsons 1.032,184.00 Engineering Services-Integrated ProgremlProject Maeagement.Temporary Staffing.MM'1.&Supplies
82326 Kcdriron Companies,Inc. 114728.25 Fe rke Chloride
Nwellfn`FxcELm.vmaPawaElcelnn use gepenmmY.'1a5ro Pam Repom-aesom EXHIBITS
1J1101, Page 3 of B 711.
Claims Paid From OB/18N8 he06130NO
Warrant N. Vendor Amount Description
52327 Lee&Ro,Inc. 68,494.24 Pmfessipnal Services 649
$2328 Modular Ptinie,Inc. 468,752.62 Professional Services 1146,J-79,P 40&1-1D
82329 Ponaer Americas,Inc. 188.372.01 Sisncm Hypochlonte
82330 Solutions ECS&S.Inc. 97.948.00 Prohnexual Services SP-34
82331 Teamo Coatings 30.105.00 Painting Services-Fiberglass Ducting&Tanks at Various Pit.1 Locations
82332 Tells Ranch/Magan Forms 280.029.70 Residuals Removal MO 3-29-95
82333 US Metro Group,Inc. W.In.50 Janitorial&Floor Maintenance at Plants 1&2
823M US Peroxide,L.L.C. M.920.15 Oder&Conoe.Cenral Treatment W Coll.By..;Hydrogen Peroxide
62335 Who Ford 104.818.13 (7)Ford Teuros Fleet BE Sedans
523M Ameron International 803.403.53 Construction 1.24
82337 Helix Efechic,Inc. 213.835.50 Construction SP-81
82338 J F Shea Conshadmn,Inc. 0,399,380.31 Construction J-77&P2.86
82338 J R Franc Consimamn 1,632,184.20 Construction P1452
82340 Margate Construction,Inc. 553.887.00 Considered Pi-37
82UI Slave P.Rados.Inc. 1,016,65&30 Consrucron 1.24
82342 Union Bank of Califomin 112,951.70 Construction 1-24.Retention
82343 LAChemical 1.936.48 Bleach
62344 A W Chesterton 782.68 MaphBnical Pope&Supplies
82US American Water Works Association 20.00 Membemhip
82345 Absolute Standards,Inc. 40.00 Lab Pad,&Suppies
82347 Adams Electronics.Inc. 169.00 Repair&Maintenance Sensors-Collection Shop's 32'Sony TV
82348 AETC 10.809.06 Air Quality Monilodng-RATA Testing
52349 Agilenl Technologies.Inc. 1.958.11 Lab Pens&Supplies
82350 Airlifts Safety.Inc. 5.890.05 Safety Supplies
82351 AKM Consulting Engineers 13.800.00 Professional Senates-Part-Time Dig Algid Technician
82352 Apek Batteries 1,637.28 Battery Pecks
82353 Applied Industrial Technology 26.51 Mechanical Pads&Supplies
82354 Aquarium Doctor 116.21 Human Resources Aquarium Service
82355 AT&T Universal Bitter 1,614A0 Telephone Service
82356 American Telephone&Telegraph Corp. 25.12 Telephone Service
82357 ATCC(American Type Culture Collodion) 83.20 Lab Pads&Supplies
82358 Awerds&Trophies Company 38.96 Aaddds&Trophies
B2359 Battery Speolalties 1.118.28 Saturn..
82360 Bee Busters 150.00 Peal Control
82361 Bee Men Pest Central,Inc. 326.W Paet Contra
82302 BioMeneux Ytik,Inc. 2nA9 Lab Pads&Supplies
32363 Black Be.Corporation 1,988.13 Computer HaNwmaSoBwere
82364 BMC Business Machines CoruuBanes,Inc. 3.655.96 HP LeserJel Printer odFAX
82WS Bush&Associates,Inc. 884.00 Professional Services 7-W
82366 City of Irvine 30.00 Meeting Expense
82367 Cal Partitions,Inc. 123.91 FUm11ure&Fixtures Instillation for New Division 820 Stiff
82368 California Filtration Soles and Servks 1,697.45 Mechanical Pads&Supplies
82369 CA.P.I.O.1991 Awords 175.00 Meeting Registration-Division 330
82370 Caro1nc Engineers 953.25 Professional Services J-102
BM71 DEN Consonance 215.59 Lab Pens&Supplies
82372 Cole Permer Instrument Co. 262.10 Metering Tubas
B2373 Columbia Analytical Services.Inc. 4,716.00 Anetyela of Manua er.Industrial Wastewater&Biosolids
U374 CumpuCom Systams,Ine. 67.89 Computer HardWans/Soltwere
82375 Consolidated Elect Distributors.Inc. 412.35 Electrical Perk&Supplies
82375 Consumers Pipe&Supply Co. 4,562.78 Plumbing Paris&Supplies
82377 Cooper Cameron Corporation 5.587.88 Engine Supplies
82378 Consensus Express 3.321.23 ONce Supplies
H:WgMnrExCELerOdAWRNaIE'4 ..Pep BaenmaMaen.Pool Papers-Oe eOB EXHIBIT
expunc Page 4 of 8 mwmpa
Claims Paid From Mortgage to 06130106
Warrant No. Vendor Amount OexHFtion
82379 CR&R,Me 1775.00 Container Rentals
82300 Culligan of Orange County 45.30 Melnt.Agreement-Can Gen Water Soeecer System
$2381 Davids Tree Service 3775.00 Tree Most.Sarvio
82382 Oelta Packaging Produce,Inc. 147.58 Lab Pans&Supplies
82383 Department of Consumer AMain 125.00 Membership
82384 Dunn Edwards Corporation 329.46 Paint Supplies
82385 Elecalcel Reliability Santora 4.241 Professional Services-Electrical Randall Testing nor Capital Projects
82US Enchanter,Inc. 5.700.00 Ocean Monitoring&OUNeII Inspection&Maintenance
82387 Enecon Contended 1,540.00 Leak Repair Kit-Oullall Line
82388 Emoi-0hlpr 3.077.01 HydroUtoric ACM
82389 Evegure Water Solutions,Inc. 1.043.12 Mac unical Pale&Supplies
82390 Ewing Irrigated Industrial 58.04 LeMscape digalbn Parts&Supplies
82391 Fetlaz Corporation 49.0 Fraught Services
82392 FaMoson Enterprises,Inc 509.12 Valves
82393 Find American Reel Estate Solutions 450.00 On-Line Orange County Property Infismafion
823N Fisher Scientific Company,L.L.C. 3.604.56 Lab Pans&Supplies
82395 Forked Engineering&Surveying.Inc. 9,965.20 Surveying Services-Various Capital Projects
82396 Franklin Covey 550.43 Office Supplies
82397 Garland Manufacturing Co. 546.00 Mechanical Pans&Supplies
82398 Barred Callahan Company 8,050.80 Chemicals
82399 Govemmennl Accounting Standards Board 305.00 Publication
82400 Gates Fibmglic s Insallan 9,504.00 FdmQI8ss Repair-Hydrochloric Acid Containment Area&Hydrogen Peroxide Area Containment Line
82401 Goldenwesi V6Mow Service 2,335.00 Gmundskeopilg Services&Weed Assonant
024M2 Grainger.Inc. 2.24&44 Mechonical Pads.Tools&Supplies
82403 Candor Electric Company 4,217,02 Electrical Paris&Supplies
82404 Guarantee Records Management 790.59 Off-Stu Records Storage
B2405 Hach Up Forum Industries 1.188.35 Mechanical Pads&Supplies
524M Harrington lnduslrial Plastics.Inc. 89.88 Mechanical Pads&Supplies
82407 Hess Oil Co..Inc 459.40 Grease
82NB Hea0h Science Micha des 4.950.00 Training Registration-Boat Salty
82409 Heal Technology Products 188.71 Mxhsn=l Pans&Supplies
82410 Heyi Facial Company 21.319.20 (20)HP Notebooks
92411 Home Depot 2,346.17 Mix.Repair&Mainlanance Mankind
82412 Hookers Repair S.M. 101.55 Repair&Maintenance-Lebmnco Dishwasher
82413 Harbor,Technology 276.65 Lab Pans&Supplies
82414 Hub Auto Supply 2.850.88 Vehicle Ports&Supplies
82415 City of Huntington Beach 14,830.29 Water Use
82416 Wev 1,357.65 Lab Para&Supplies
82417 Inherent Dimension Group 3,870.52 Mechanical Pans,Supplies.Locks&Torts
82418 hundred Metal Supply 340.49 Metal
82419 Innerkne Engineering 13,063.49 Bearskins YMeo Inspections&Cleaning in Areal
82420 Innovmwe Technical Solutions,Inc. 23,109.99 Professional Somber;-Construction Safety PrWmm
82421 Inorganic Ventures.Inc 415.62 Lab Pens&Supplies
52422 Invensys Systems,Inc. 1,632.50 Electrical Pans&Supplies
82423 Iron Mourned 100.00 Sorage Fee-old Documents PI-37
82424 JG Tucker iml Son.Inc. 475.00 Repair&Recerifcation-Winch Menhola Saby Device
82425 Jeck-X-Change, 269.38 Equipment Hearst.-100 Ton Jack
82426 Johnatare Supply 1,492.57 Electrical Pans&Supplies
82427 Kelm Boger 595.00 Training Registration
82428 IOeinlaldm,Inc. 204.00 Soils.Concrete&Other Maunals Telling
82429 lane SO and Lughmd 6.097.60 Professional Smvices-Internal Apdiura
82430 Letls-Nazis 112.62 Subscription
HnmPam6Xc6L.4uva7APmuaecmmr Pds aalaa'ttm'CtmaFw4 easel-psspoa Page EXHIBITS
W31pS 6 71,p
Claims Paid From OBI18I08 to OBI30106
Warrant No. Vendor Amount Description
82431 Lihcem Safety,Inc 151.34 Safety Supplies
82432 LINJER 5.525.31 Professional Semcs-DART M09.22.99
82433 Massachusetts Mutual Life Insurance 145.41 Executive Mentality Plan Premium
824M McMaster Can Supply Co. 1,425.00 Mechanical Parts&Supplies
BUSS Maggie 1,465.40 SOBware Support-Pulsemaster/Mastarlest Extended Support Program
82436 Meidhsrd Glass Products 865.00 Lob Parts&Supplies
82437 Mid West A drocetes 5,426.49 Pump Parts&Supplies
82438 Method Sall 616.67 Sall
B2439 Municipal Information Systems 240.00 Membership
82440 MWR Americas,Ina 24.372.31 Professional Seines P2-74
82441 National Assoc.of Clean VJster Agencies 695.00 Training Registration
82442 National Seminars Group 398.00 Training Registration
82443 Neal Supply Co. 271.00 Plumbing Supplies
82444 City of Reaped Beech W9.35 Wafer Use
82445 Nadel Communications 1.124.87 Cellular Phones&Air Time
82448 NRG Thermal Services.L.L.C. 3.710.57 Mechanical Pens&Supplies
62447 OCS Reprographics 2M.39 Frieling Service-MO 12610D
82M8 Office DOwt Susmess Services Division 2.803.68 Office Supplies
82449 Olson Technoogies,Inc. 337.34 Mechanical Pens&Supplies
a2450 OMI Industries 4.180.00 Chemicals-Otlor Canlrol
82451 Oneseurce Distributers,Inc 4,933.0 Electrical Parts&Supplies
82452 Oracle Corporation "BAD Sa0ware License Rensaal-Grade Enterprise&Internet Development Suite
82453 Orange County Tax Collector 98.56 Spacial Assessment-Newport Beach Harbor Moor for Narrow
82454 Orange County Vector Cordial District 132.67 Past Control
$2455 Orange FIUM System Technologies,Inc. 641.96 Plumbing Paths&Supplies
82458 Oxygen Semra Company 1.698.11 Specialty Genes&Lab Parts&Supplies
82457 Pacific Mechanical Supply 566.59 Plumbing Supplies
82456 Pacific Parts&Controls,Inc. 3,00.03 Computer HardwarelSoeware&Misc.Supplies
824M Pacific Supply 44.46 Mechanical Parts&Supplies
62450 Parker Supply Company 3,980.00 Installation of Concrete Fl0or SestedCoating on Paint Shop Floor
82461 Parld ouso Tire.Mc. 406.43 Time
62462 Peones.VMpirg Materials Co. 586.M Janitorial Suppler
82463 Plumbers Depot.Inc 711.15 Collection Tools
82464 POtydyde.Inc. 17.436.58 Cationic Polymer MO 3-11-92
82465 PPM WOO,Inc. 2,430.13 SoBeare License Renewal-IXO Soeware.Administration&On-Line Training
82466 Primary Source Office Furnishings,Inc 3,007.90 Office Furniture&Misc.Equipment
82467 Printing Solutions,Inc 398.68 Fred,Services-Serer Spill Reference GUM.
824N Prudential Onmil Supply 1.850.39 Uniforms&Related Articles
62469 Guinn Group,Inc. 1,038.24 01,Air&Feel Fillers
824M RmWk Corp. 484.19 Lab Pare&Supplies
82471 Royale Cleaners 22.00 Dry Claiming Servtaes
82472 Safelycare Inc 538.74 Safety Videos
82473 SBC Long Distance 1.407.17 Long Distance Telephone Services
82474 SBCMCI 2,8T2.69 Telephone Serums
82475 Stowing Bimat 132.98 Mechanical Paths&Supplies
824M SmtM Voice&Data,Inc. 2,284.79 Telephone System Maintenance
824" Shamrock Supply CO..IM 925.80 CeanedDegmasor&Painting Supplies
82478 Smith Emery Cpmpeny 944.00 Soils,Concrete&Other Materials Testing
82479 Southern California Edison 29.63 Power
824M Southern Calfomia Trans Service 2,826.64 Electrical Para&Supplies
92"1 Southeast Vain&Equipment 960.59 MarJunical Pars&Supplies
62482 Smrklefis 2.128.73 Drinking WatedCmler Rentals
H:NapMn`6xCELEneV'2pM81Ma614Ydmr hem aeponwsoPchims Ped Room-Ofi EXHIBIT B
nM1Mc Pala 6 of$ 711.
Eo .,
Claims Paid From 06118N6 to 06I30108
wament No. Vendor Amount Description
8240 Spec Services.Inc. 18.916.73 Erlginaering Services J-33.1
824P SPEX Camping,Inc. 70417 Lob Parts 8 Supplies
82485 Standard 8 Poole 1,OOD.00 AneMiral Services-Series 1992 LiOubiry Exnension
82486 Summit Steel 12.09 Metal
82487 Sunset Ford 611.11 Vehicle Pens B Service
$2488 Sunset Industrial Part 2.210.56 Mectlenical Pens 8 Supplies
82489 Terminix lmernational 2.0W.00 Peet Contra)
82490 The Help Center,L.L.C. 11.000.00 On-Sile Training-WUMplace Violence Prevention
82491 Thomas V.Gerlinger 4.550.00 Lab Analyses
02492 Thompson Industrial Supply,Inc 4.941.73 Mechanical Pens B Supplies
82493 Todd Painting,Inc. 9,357.00 Pending Services
82494 To Ws Lock&Safe Services&Saks 142.00 Lochs 6 Key,
82495 Tremor Inceachin ! 6,510.00 Roof Repeas-Power Bidg.e2
82496 TriStete Seminar On-the-River 270.00 Training Registration
82497 TIUM 8 Auto Supply,Inc. 419.20 Auipmntive Pans 8 Supplies
82496 TO Shed,Inc-Store 00140 3.814.68 Siorege Shed 8 Installation Services at Pit.2
82496 Ube Scientific 246.82 Lab Paris 8 Supplies
82500 United Parcel Servka 29.58 Parcel Services
82501 US Aircenditioning Distributor,Inc 49.46 Mechanical Pans B Supplies
8202 Valley Detroit Diesel Allison 1,322.66 Motor Oil
52503 Venom Celifpmia 81.35 Telephone Service
6204 Vemes Plumbing 4,610.00 Smvice Conrad-Testing 8 Can,BackBow Devices at Pro, 1 6 2 6 Pump Ste.
B2505 Vocem USA,L.L.C. 1,271.89 Safety VMens 6OVUs
825M Vertex Corp. 2,B73.00 Gets Repairs at Pit.2
82507 V WR Scientific Products 8,405.54 Lob Parts 8 Supplies
82WO The Wackenhut Commerce 18.286.O7 Security GuaMs
82509 West,Markets Corp. 6.084.02 Meint.Agree.-Grit 8 Screening,Removal a Digester Mail Removal
82510 Wmer Environment Federation 149.00 Training Registration
92511 WateReuse Associe0on 10.0pol) Water ReUse Foundation Subscriber Fees
82512 We.Berlin,Supply 290.18 Jemtorial Supplies
52613 Weber Scientific 399.79 Lab Pan,8 Supplies
82514 WEF 182.00 Membership-Water Environment Federation
82515 Writ Lite Supply Company.In 29.82 Electrical Pans 8 Supplies
US16 Nilsen Supply,Inc. 249.98 Pipe
U517 Xerox Confirmation 18788.62 Copier Leases B Managed Services
82518 ValelChase Materials Handling.Inc. 888.13 Electric Can Pans
U519 Ol son Construction,Inc. 500.00 Compaction P242
U620 Orange Community Bank W.00 Constructed P242,Retention
82521 Sham Electric L.P. 11,150.00 Censtuction SPA4
0252E Union Bank of California 23,759.50 Construction SPAT,Retention
82523 Wmt Star En,ronmental,Inc. S42aSo Construction FE05-33 8 FE05410
82524 Mee Adams 95.00 Memug/Tmining Expense Reimbursement
82525 Jude Brooks 130.00 Meatng/Tmining Expense Reimbursement
82526 Brace A.Chapman 175.00 lieeLing/Training Expense Reimbursement
82527 Thomas 0.Dodderer 195.00 Me,ting/Training Expense Reimbursement
82528 Lydia Eden 130.00 Meeting/Training Expense Reimbursement
82529 Michael T.HasaM 195.00 Meting/Training Expense Reimbursement
82530 Urge Lomvdo 220.49 MeefinglTmining Expense Reimbursement
82531 James W.Made 2,431.35 MsetingRreining Expense Reimbursement
82532 Ellen Ray 1,360.33 MeetingRreining Expense Reimbursement
112533 Jeff,,T.Rase 44.00 Meetingaraining Expense Reimbursement
82534 Use L.Tomm 140.96 Mesting/Training Expense Reimbursement
Hxmink`ExCF1.4YNffi.ePS11a001Cimma Pm Bape4,607Cbrs Pau aspen-063baa Tefe EXHIBITS
M fltp% Pap 11 NAA
Claims Paid Frame ONIMS 006130MG
Women No. Vendor Amount Description
82MS Ken H.Vi ng 250.00 Meeting/Tmining Expense Reimbursement
82538 Paula A.Zeller 363.89 MeetingRraining Expense Reimbursement
82537 City of Huntington Beach 2.894.00 Coastal Development PermB
82538 Dmatr Auiani Inaurancs Service,Inc. 4.90.00 Actuarial Review
82639 Orange County Sanitation District 382.52 Petty Cash Reimb.
82MO South Coast Air Quality Management Dist. 100.00 Certification Renewal for the ESL
Total Accounts Payable-Warrants 3 24.462.521.51
Payroll Di.buspoevents
33590 - 33669 Employee Paychecks $ 13%,146.17 Biweekly Payroll 08121 Me
33670 - 33684 Employee Paychecks 13,032.54 Interim Payroll,-ReVoc&Terminations 0 6120106-0SMY06
127293 - 127844 Direct Deposit Statements 1,145,071.17 Biweekly Payroll(IMIM6
Total Payroll Disbursements S 1,297,552.18
Whe Tnmfer Payments
OCSD Payroll Texas&Contributions $ 647.863.93 Blwealtiy Payroll 9 IAMI
Total Wlra Transfer Payments S 64TA63.93
Total Claims Paid 0 6116108-081301e6 S 26,407,937.92
n:1.pnx1 Cc1 eupAwPSraREtCaima Polo Repc 01MJs1me Ped Report-ae]Om EXHIBIT
aN2leoc Page B of B mamm
BOARD OF DIRECTORS Meebn9Date I Toed.orDir.
7/19/06
AGENDA REPORT Rem Number Rem Number
9fal
Orange County Sanitation District
FROM: Lorenzo Tyner, Director of Finance
Originator: Michael D. White, Risk Manager
SUBJECT: SUMMONS & COMPLAINT RE SPENCER V. ORANGE COUNTY
SANITATION DISTRICT.
GENERAL MANAGER'S RECOMMENDATION
Receive and file summons and complaint re Christopher Spencer v. Orange County
Sanitation District, et al., Orange County Superior Court Case No. 06CC05848, in
connection with Rehabilitation of 14t" Street Pump Station, Contract No. 5-51, and
Rehabilitation of"A" Street Pump Station, Contract No. 5-52, and authorize General
Counsel to appear and defend the interests of the District.
SUMMARY
Please see attached memo dated 7/12/06 from General Counsel.
BUDGETIMPACT
❑ This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
ALTERNATIVES
CEQA FINDINGS
ATTACHMENTS
Memo from General Counsel.
LT:MW:BG
Page 1
LAW OFFICES Or
WOODRUFF, SPRADLIN & SMART
A PAOPPSLIOH AL CORPORATION
MEMORANDUM
TO: Board of Directors
Orange County Sanitation District
FROM: General Counsel
DATE: July 12,2006
RE: Christopher Spencer v. OCSD
This lawsuit was served on OCSD on July 7, 2006. We are just in the process of
gathering information concerning this claim. This lawsuit alleges that sometime prior to
May 5, 2005 OCSD-retained contractors (Kiewit Construction and Malcolm Drilling
Company) began construction of a pump station immediately adjacent to the Plaintiff's
property. The complaint alleges that the contractor filled a pit with water that
undermined the soil on Plaintiffs property. Plaintiff claims that he suffered in excess of
$160,000 in damage to the improvements on the land of Plaintiffs property. In addition,
Plaintiff alleges that he was attempting to sell the property at the time of the incident and
has lost$250,000 based on his inability to sell the property.
General Counsel's office will obtain the contracts between OCSD and the
contractors working on the pump station. We anticipate that the contracts require
insurance. We anticipate that the insurance is required to name OCSD as an additional
insured under the policy. We will tender the defense of this litigation to the carrier for
the contractor. Presently we are not aware of any facts that would indicate any OCSD
employee was directly involved in the construction or any of the damage suffered by
Plaintiff.
BPADLEY R. HOGIN
General Cou
CRAIG G. F TON
cc: James D. Ruth, Interim General Manager
Bradley R. Hogin,General Counsel
514415,1
W
MINUTES OF STEERING COMMITTEE MEETING
Orange County Sanitation District
Wednesday, June 28, 2006, at 5 p.m.
A meeting of the Steering Committee of the Orange County Sanitation District
was held on Wednesday, June 28, 2006 at 5 p.m., in the District's
Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS: STAFF PRESENT:
Directors Present: Jim Ruth, Interim General Manager
Steve Anderson, Chair Nick Arhontes, Director of Regional Assets
Jim Ferryman, Vice Chair and Services
Carolyn Cavecche, Chair, OMTS Bob Ghirelli, Director of Technical Services
Committee Jim Herberg, Director of Operations and
Darryl Miller, Chairman, FAHR Committee Maintenance
Tod Ridgeway, Chairman, PDC Committee David Ludwin, Director of Engineering
Lorenzo Tyner, Director of
Directors Absent Finance/Treasurer
Jim Silva, County Supervisor Lisa Tomko, Director of Human Resources
Gail Garrett, Committee Secretary
OTHERS PRESENT: Michael Gold, Legislative Affairs Liaison
Bradley R. Hogin, General Counsel Mike Moore
Don Hughes Layne Baroldi
Barry Newton, Creative Management Ryan Wheeler
Solutions, Inc.
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no comments by any member of the public.
Minutes of the Steering Committee
Page 2 w
June 28, 2006
(4) RECEIVE. FILE AND APPROVE MINUTES OF PREVIOUS MEETING
The minutes of the May 24, 2006 Steering Committee meeting were approved as drafted.
(5) REPORT OF THE COMMITTEE CHAIR
Chair Steve Anderson introduced Michael Gold, Legislative Affairs Liaison. Mr. Gold
provided an update on three major issues relating to contracting procedures for the design-
build Assembly Bill AB2580.
CASA will hold their Annual Conference in Monterrey, CA on August 9-12, 2006. Directors
are to notify committee secretary if they will attend.
Mr. Anderson provided a brief report on his trip last week to Washington DC, accompanied
by Wes Bannister, OCWD Chair, and Virginia Grebbien. They met with representatives
from the Orange County delegation and Senators Feinstein and Boxer on the status of three
projects for which we are seeking federal funding: GWRS, SARI line, and secondary
treatment.
Chair Anderson announced the standing committee meeting dates for July, and noted that,
due to the League of Cities conference, the Steering Committee and Board meetings will
meet a week earlier, on Wednesday, July 19, 2006.
Director Ridgeway announced that he will not attend the July Steering and Board meetings.
(6) REPORT OF THE GENERAL MANAGER
A. Due to time constraints, Interim General Manager Jim Ruth said he would
review the June Status Report at the Board meeting tonight.
B. Independent Reviews
i. Operations and Maintenance
Jim Herberg, Director of Operations and Maintenance, discussed
the Spring 2006 Operations and Maintenance Staffing study and a
proposed independent follow-up analysis which would provide a
more detailed assessment of the work load, efficiency, and staffing
needs for the O&M and RA&S departments.
Directors expressed concerns with the estimated consulting
services costs of$250,000 and directed staff to refer the
independent review to the OMTS Committee for further discussion.
Minutes of the Steering Committee
° Page 3
June 28, 2006
ii. Capital Improvement Plan
David Ludwin, Director of Engineering, provided a brief history of
the Capital Improvement Program and described the scope of work
for the proposed CIP independent assessment.
Directors expressed concern with the estimated costs proposed for
an in depth review. Some directors agreed that staff has already
provided a detailed review resulting in the $474 budget cut.
Committee members concurred that the main focus now is to
evaluate the current CIP portfolio.
District staff was directed to go forward with the ASCE evaluation at
an estimated cost of$20,000 and get further direction at the July
PDC.
(7) REPORT OF GENERAL COUNSEL
General Counsel Brad did not report.
(8) DISCUSSION ITEMS (Items A-C)
A. Performance Appraisal System for General Manager
Recommend to the Board to approve the performance appraisal and
evaluation program for the General Manager, dated June 28, 2006, to
include the following elements:
L Board Management Appraisal Form with GM's recommended goals
ii. GM's Annual Planner and Midyear Planner Form
iii. GM Performance Appraisal Plan Guidelines
Mr. Ruth introduced Barry Newton of Creative Management Solutions, Inc. who
presented the new performance appraisal and evaluation program for the
General Manager. Mr. Newton described the three major elements and said
program will assist in clarifying Board priorities as well as District and General
Manager goals. After some discussion, it was the consensus of all members
present that the Steering Committee conduct the GM's performance appraisal
interviews annually, with input from the full Board. Mr. Newton will present the
program to the full Board in July.
The Steering Committee directed General Counsel to agendize the GM's
Performance Appraisal and Evaluation annually at the May and June Steering
Committee and Board to jump start the process.
Minutes of the Steering Committee e
Page 4
June 28, 2006
B. The Agenda Items scheduled to be reviewed by the Board's working
committees in July were reviewed.
C. The agenda items scheduled to be presented to the Board at tonight's
meeting were reviewed.
Directors requested that Item 22 be pulled from the Board agenda.
(9) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS.
IF ANY
a. Convene in Closed Session to confer re Appointment of Assistant General
Manager, Government Code 54957(b)(1).
This supplemental agenda item was considered under Closed Session.
(10) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(11) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND/OR STAFF REPORT
Staff was directed to bring Item 2 of the CIP Independent Review scope of work to the PDC
Committee in July for discussion.
(12) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday, July 19, 2006 at 5 p.m.
The next Board Meeting is scheduled for Wednesday, July 19, 2006 at 7 p.m.
(13) CLOSED SESSION
The Committee convened at 6:30 p.m. in Closed Session, pursuant to Sections
54956.9(b), 54957(b)(1), 54956.9(c), 54956.9(a), 54956.9, and 54957(b)(1) to discuss
six matters. Minutes of the Closed Session are on file with the Board Secretary.
Confidential Minutes of the Closed Session held by the Steering Committee have been
prepared in accordance with Government Code Section 54957.2, and are maintained
by the Board Secretary in the Official Book of Confidential Minutes of Board and
Minutes of the Steering Committee
Page 5
: June 28, 2006
Committee Closed Meetings. A report of the recommended actions will be publicly
reported at the time the approved actions become final.
At 7:10 p.m., the Committee reconvened in regular session.
(14) ADJOURNMENT
The Chair declared the meeting adjourned at 7:10 p.m.
Submitted by:
Gail Garrett
Steering Committee Secretary
H:WepllegentlelSMenng CommMee12008LNinuM51g54g06 SC Minules.tlos
BOARD OF DIRECTORS Meeting Date To ad.or Dlr.
07/19/06
AGENDA REPORT Item Number Item Number
llfbl
Orange County Sanitation District
FROM: Lisa L. Tomko, Director of Human Resources
SUBJECT: PERFORMANCE APPRAISAL SYSTEM FOR GENERAL MANAGER
GENERAL MANAGER'S RECOMMENDATION
Approve the performance appraisal and evaluation program for the General Manager,
dated June 28, 2006, to include the following elements:
• Board Management Appraisal Form with GM's recommended goals
• GM's Annual Planner and Midyear Planner Form
• GM Performance Appraisal Plan Guidelines
SUMMARY
District's Consultant, Creative Management Solutions, Inc. was requested to develop a
performance appraisal program for the General Manager(GM). A new plan has been
designed following an analysis of best market practices and review of the performance
appraisal program previously approved by the Board of Directors for the Executive
Management Team (EMT) and Mid-Management positions. The new program includes
the following elements:
• Board Management Appraisal Form with GM's recommended goals (attached)
• GM's Annual Planner and Midyear Planner Forms (attached)
• Performance Appraisal Guidelines (attached with calendar included)
• Sample General Manager Objectives from other organizations (attached)
• Outline of 30 Minute Orientation for Meeting (market compensation results and
2006 Compensation Matrix to be provided at meeting for illustration purposes)
PRIOR COMMITTEE/BOARD ACTIONS
The Board approved a new performance appraisal program for the EMT and Mid-
Management positions on April 26, 2006.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
Form No.OW-102-1 M-.R.,a -sc
�epl.]2o R—W 711W(M
Page 1
❑ This item has been budgeted. (Line item: ) ,
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
The Board has not had a formal performance appraisal system for the General Manager
in a number of years. The new program will assist in clarifying Board priorities as well as
District and General Manager goals. This will provide clearer policy direction and
feedback, which Board members requested during the management audit process.
The new program will be linked with the Strategic Planning and Budget Planning
processes and the performance expectations set for EMT and Mid-Management
positions. The General Manager will be expected to identify potential future goals, list
accomplishments, and critique his/her performance while the Board will be able to
consider this information in preparing its evaluation of the General Manager's
performance. The Steering Committee can integrate Board member ratings and
comments into the final review.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. General Manager Annual Planner (completed by GM to initiate process)
2. General Manager Performance Appraisal (completed by the Board for annual review)
3. General Manager Mid-Year Planner(completed by GM to inform the Board about
progress and consider modifications of performance goals set at the start of the year)
4. Performance Appraisal System Guidelines
5. General Manager Appraisal Ratings Worksheet (used by the Steering Committee to tally
the Board ratings-GM only sees Final Evaluation).
FOm No.01YfY2-1 f..Re -SC
a9 N
Reviae0. ]ltYteN
Page 2
GENERAL MANAGER
ANNUAL PERFORMANCE EVALUATION (DRAFT)
Name of General Manager Appraisal Period(From:) Appraisal Period(To:) Date of Appraisal
The Board of Directors adopts its major initiatives and strategic goals for the OCSD in concert with the General
Manager. This process helps to align priorities, budgets, and work plans for the benefit of customers and staff:
MNumber UNIFYING PRINCIPLES(Aligned With Strategic Plan)
I Communin'environmentalstewardsld
2 Motivational workplace environment.
3 B ecdre wasteavtter mane emenL
Sound tscalrnanaaement.
I. GOALS/RESULTS FOR CURRENT REVIEW PERIOD (2005-2006)
GM's Program Goals/ Board Comments Goal Rating Adj.
Actual Outcomes Wtg. (1-5) Rtg.
1. Transform the budget from two-year line
item to a two-year program budget for
implementation in the 2007-2008 budget year. 15% 4.0 .4
2. Submit a reorganization plan to the Board
that will address structure,workload, and span
of control.
15%
3. Develop new job descriptions for the
General Manager and the proposed Assistant
General Manager position consistent with the 5%
new organizational plan.
4. Oversee independent reviews by outside
consulting firms of CIP Program, O&M, and
RA&S operations to determine their 10%
effectiveness on ST and LT basis, and level of
market competitiveness.
Page 1
04r 6M Version 1 1
I. GOALS/RESULTS FOR CURRENT REVIEW PERIOD (2005-2006)
GM's Program Goals/ Board Comments Goal Rating Adj. I
Actual Outcomes Wtg. (1-5) Rtg.
5. Implement new Performance Appraisal
System for Executive Management Team
(EMT)and Middle Management, effective
July 1, 2006, 10%
6. Develop and implement a Succession Plan
for all District departments effective
July 1, 2006,
5%
7. Establish a Labor Strategy for future
negotiations with six bargaining units by
September 1,2006,
10%
B. Develop a Cooperative Financial Plan with
the County of Orange and Santa Ana
Watershed Project Authority(SAWPA)to
address the need to relocate the Santa Ana
River Interceptor(SARI) line. 10%
9. Establish a Leadership Training Program for
EMT and Middle Management by
September 30. 2006.
5%
10. With Board concurrence, implement the
ten major initiatives outlined in the Strategic
Plan.
10%
BOARD'S RATING OF PERFORMANCE GM GOAL ATTAINMENT 75% Weigh
Does Not Meet Marginally Meets Exceeds Far Exceeds
❑ Expectations ❑ Meets ❑ Expectations ❑ Expectations Expectations
<2.4 Expectations 3.0-3.9 4.0-4.4 4.5-5.0
2.5—2.9
rage Goal Arlainnx Rating x .75 =
Note.' One "Does Not Meet Erpeciations"would result in an overall rating of"Does Not Meet Erpecrarions". Two or more "Marginally
Meets Erpectarions Ratings" could result in an overall 'Marginally Meets Expectations'mling. Fever than 10 rated goals will result in
table modification.
Page 2
0/2alOG version 1.1
II. GOALS/OUTCOMES FOR NEXT REVIEW PERIOD 2006-2007
Description of Program Goals and Work Plans: Wtg.
1.
2.
3.
4.
S.
6.
7.
B.
9.
10.
Page 3
0426/06 Version 1.1
III. CORE COMPETENCIES
FACTORS AND DEFINITIONS FOLLOWED BY RATINGS OOalik, Nip1nf1y
rsee West allies EruMr Filch ede
E�pcuWne E.PsLXon E�tidetlgn EVedeaon E�CrctaMxs
1. LeadershiplDecision-Making
Aligns management staff with Board's strategic plan and priorities. Maintains rows on results. 1 2 3 4 5
Sets example for others.Uses good judgment and common sense In making decisions.
Comments:
2. Performance Management/Staff Development
Sets clear performance standards. Accepts responsibility for the behavior of those he/she 1 1 2 3 4 5
supervises. Completes performance reviews in a timely manner. Effectively mentors.Coaches
and motivates other members of management team and staff to achieve desired resuhs. ❑ ❑ ❑ ❑ ❑
Comments:
3. Interpersonal Skills/CommunicationsrTeamwork
Shows sensitivity,tact and insight in relationships with Board,and business antl community 1 2 3 4 5
relations. Anticipates and resolves potential communications problems.Treats others in a fair,
consistent,and respectful manner. Has an open and approachable manner. ❑ ❑ ❑ ❑ El
Comments:
4. Budgetary Planning/Management
Accurately forecasts effected revenues and expendilures required for District projects, t 2 3 ♦ 5
programs and resources. Ensures that department heads conform with budgetary guidelines
tlWl have been established Inman the guidance of the Board of Directors. ❑ ❑ El El ❑
Comments:
5. Creativity/InnovatioNlnitiative
Originates new approaches,encourages independent thinking,and initiates and ensures Mat 1 2 3 4 5
actions are implemented to improve individual and organizational performance. Elicits El El El El
feedback and encourages new systems,processes,and procedures that are realistic.
Comments:
BOARD'S RATING OF CORE COMPETENCIES 25% Wei htin :
Does Not Marginally Meets Exceeds Far Exceeds
❑ Meet ❑ Meets ❑ Expectations ❑ Expectations ❑ Expectations
Expectations Expectations 3.0—3.9 4.0—4.4 4.5—5.0
c2.4 2.5—2.9
Averse Core Competency Rating x.25 =
Note: One rating of"Does Not Meet Expectations"hwuld result in an overall rating of"Does Not Meet Erpectatioes Tito or more
"Needs Improveluent Ratings'would result in an overall rating of"Needs Improvement'.
042810G Version 1.1
Page 4
BOARD'S OVERALL RATING OF GENERAL MANAGER (Totaling 100%):
Does Not ❑ Needs Meets Exceeds Far Exceeds
Meet Improvement Expectations Expectations Expectations
Expectations 2.5-3.0 3.0-3.9 4.0-4.4 4.5-5.0
<2.4
Taal Rating = Sum of Goal and Cor tencv Ratings
Note: One rating of"Does Not Meet Expectations"would result in an overall rating of"Marginally Meets Expectaions". Two or
more "Marginally Meets Expectations Ratings"would result in an overall rating of"Marginally Meets Erpectalons".
W. OVERALL COMMENTS
GENERAL MANAGER'S SUMMARY COMMENTS:
BOARD'S RESPONSE TO GENERAL MANAGER'S SUMMARY COMMENTS:
General Manager's Signature Date
Name of Blearing Committee Chairperson Steerbg Commabe ChairPerson•a Signature Dab
Page 5
0426W Version 1.1
GENERAL MANAGER'S
ANNUAL SELF-EVALUATION PLANNER (Draft)
Name of Ganeral Manager Rating Period(mm/ddtyy) Date Prepared(mm/dd/yy)
From: To:
This form provides input to your performance appraisal as part of the annual appraisal. Complete and submit this
form electronically to the Board prior to the performance review meeting. Refer to Board priorities, objectives, and
prior reviews(if available)in presenting your ideas. You may attach additional pages, as needed.
1. Describe at least three of your accomplishments in the past fiscal year, considering the Strategic
Plan, Board expectations, and your overall performance:
2. Describe areas in which you could have been more effective in the past fiscal year and what you
might do to be more effective in the next fiscal year:
06/06/06 Draft Version 1.1
3. Suggest at least three new goals, or changes to existing goals for the next fiscal year that should be r
shared with the Board and management:
4. Describe what the Board, various Committee representatives, and/or Executive Management Team
could do to assist you in performing your 'ob more effectively:
General Managers Signature:
Date:
Executive Steering Committee Chairperson's
Signature:
Dare:
06/06/06 Draft Version 1.1
GENERAL MANAGER'S MID-YEAR PLANNER
(Draft)
Em to ee Neme Rating Period mmld Dab Pra red(mm/rid/
From: To:
This form offers you the opportunity to update your performance goals given changes in Board program priorities or
unforeseen developments. Complete and submit this worksheet electronically to the Board prior to the mid-year
progress update. Refer to goals, accomplishments, and comments provided in the latest annual evaluation, in
presenting your recommendations. You may attach additional pages, as needed. A Powerpoint presentation may be
provided to the Board regarding your accomplishments, and progress against current goals, given the work plans.
f. Identify any changes that should be made to the goals that were established for this period:
2. Explain why you believe these changes should be made:
FOR BOARD USE ONLY
Board and Steering Committee responses to above items (expandable):
General Manager's Signature: Date:
Steering Committee Chairperson's Signature: Date:
06/06/06 Version LI
4oJajV SR HI)g1110
t
a >
¢ n
0
i
9p W2
Per/Ns THE EHJ`P��
GENERAL MANAGER
Performance Appraisal Plan Guidelines
Draft
July 12, 2006
GENERAL MANAGER
PERFORMANCE APPRAISAL PLAN GUIDELINES
July 12, 2006
Table of Contents
Section Topical Question Pages
1.0 What is the purpose of the General Manager Performance 3
Appraisal Plan? (Understanding five major reasons why it is an
essential tool for the Board and GM and provides guidance to
the EMT; additional plan advantages)
2.0 What have been some of the past problems and what are 3
some of the identified plan improvements?
3.0 What tools will be used in the performance appraisal process? 4
GM's Self-Planner, Management Appraisal, GM's Mid-Year
Planner, and GM Rating Worksheet (used by Steering
Committee to compile Board ratings)
4.0 What reference documents might be used by Board members 4
in identifying oals and writing comments?
5.0 How do the Board members, Steering Committee, and GM 5
participate in the GM's Performance Evaluation?
6.0 What does the Performance Appraisal Calendar look like and 5
what are the major steps see Visual Calendar)?
7.0 How does this program relate to the performance appraisal
system used for the EMT and Mid-Management?
8.0 How should the GM's appraisal be completed and scored? 6
9.0 How is the Compensation Matrix used given market practices 6
to consider the General Manager's eligibility for pay increases
or lump sum bonuses?
10.0 What other administrative features are involved in evaluating the 7
General Manager, updating the Compensation Matrix, and
maintaining these files?
DRAFT GM Performance Appraisal Guidelines Page
1.0 What is the purpose of the General Manager Performance Appraisal Plan?
1.1 There are a number of benefits to be realized through the General Manager
Performance Appraisal Plan. Five of its most essential uses are as follows:
;- Organize and establish Board priorities and link District goals with strategic
planning and budgeting processes.
o, Improve organizational performance through clear work plans that can be
followed through the performance period.
Set specific measures and link compensation with expected results.
7w Recognize employee strengths and accomplishments while addressing
Board areas of concern through the evaluation process.
Encourage open and meaningful feedback regarding performance
expectations.
1.2 Some of the other major advantages of having the General Manager
Performance Appraisal Plan are to have a valid and understandable process,
integrate General Manager goals with EMT and Mid-Management goals, and link
the rating results to General Manager compensation.
2.0 What have been some of the past problems with the evaluation process and
what are some of the identified plan improvements?
2.1 The Board of Directors did not previously have a formal process for evaluating
the General Manager. This plan is designed to provide an evaluation process.
2.2 A regular Performance Appraisal Calendar Cycle has been established and
performance appraisal rating tools have been provided.
2.3 This program is initiated with the General Manager's suggested goals,
accomplishments, and areas for development with the GM's Self-Planner; the
Board members consider other potential goals and priorites. The General
Manager uses the Mid-Year Plan to inform the Board regarding progress and to
update priorities, as needed.
2.4 The Board members are able to evaluate the General Manager's performance
and recommend goals for the next performance period that are compiled and
integrated by the Executive Steering Committee.
2.5 The General Manager's compensation, and potential base pay increases and/or
lump sum payments are tied to labor market rates and the Compensation Matrix.
DRAFT GM Performance Appraisal Guidelines Page 3
3.0 What tools will be used in the performance appraisal process?
3.1 The forms used for the program are as follows:
a. GM Annual Self Planner (initiated by the General Manager and submitted to
all Board members).
b. Annual GM Performance Appraisal (initiated by Steering Committee and
submitted to all Board members to review the General Manager; Steering
Committee compiles ratings and comments and conducts interview).
c. GM Mid-Year Planner (initiated by the General Manager in December to
provide a progress update to the Board in January).
d. Compensation Matrix used by the Steering Committee to determine the
General Manager's eligibility for base pay or lump sum increases, as
supported by market compensation data and the General Manager's overall
performance rating, and approved by the Board.
e. Performance Evaluation Master Scoring Worksheet (Steering Committee)-
used by the designated Steering Committee to enter the individual ratings
from the Board members to determine the overall performance evaluation
ratings.
4.0 What reference documents might be used by Board members in the
performance appraisal process to establish goals and comments for the
General Manager?
4.1 Ideas for the General Manager's performance appraisal can be drawn from a
number of different resources, which have been summarized in this section.
4.2 The District's Strategic Plan can be used to identify Board priorities that are part
of the General Manager's Performance Appraisal.
4.3 The District's Annual Budget can be referenced for major programs and revenue
and expenditure projections. The Annual Budget is being reorganized into a
program format over the next several years so that it will be easier to establish
Board priorities.
4.4 Board Agenda Reports and Minutes contain major action items for the General
Manager that can be used to wite comments and to create goals.
4.5 The Dashboard is used by the EMT to identify measures and objectives
pertaining to the District, departments, and divisions, and can be linked back into
the General Manager's evaluation.
4.6 The General Manager Job Description can be considered in preparing comments
related to the General Manager's competencies and setting goals related to
employee performance. Tips and examples for preparing goals and comments
will be presented in the orientation materials.
DRAFT GM Performance Appraisal Guidelines Page 4
5.0 How do the Board members and the Steering Committee participate in the
General Manager's Performance Evaluation?
5.1 Each Board member has the opportunity to identify potential goals, address
development areas, and assign performance ratings for the General Manager.
Since there are 25 Board members, these ideas will be integrated and prioritized
by the Steering Committee.
5.2 The individual Board member ratings are then tallied and averaged by the
Steering Committee in order to prepare the General Manager's evaluation.
5.3 The Steering Committee is expected to conduct the appraisal interview with the
General Manager. Any disagreements between the General Manager and the
Board regarding goals, workplans or measures should be resolved at the time
that these criteria are established.
5.4 The General Manager is expected to participate in the evaluation process by
considering goals and accomplishments, and by thinking about areas for self-
improvement. Additional comments may be provided using the Annual Self
Planner, or Mid-Year Planner which is provided in advance to the Board
members.
6.0 How does this program relate to the Performance Appraisal System used
Tor the EMT and Mid-Management?
6.1 The EMT and Mid-Management positions are tied to the same evaluation
program. The EMT and Mid-Management use a Self-Planner to initiate the
appraisal process and appraise their direct reports and consider strategic goals
and budget priorities to recommend ideas. The General Manager also completes
the EMT performance appraisal with the same considerations in mind.
6.2 The General Manager can then set future goals for the management team based
upon Board input and review the past year's results in June. The General
Manager is able to utilize this information in July in evaluating the results and
recommending goals to the Board for the next performance year. Other ideas
have already been generated earlier in the prior fiscal year given the strategic
planning and budget planning process.
DRAFT GM Performance Appraisal Guidelines Page 5
7.0 What are the maior steps in the Performance Appraisal Calendar in
evaluating the General Manager?
7.1 The General Manager's Evaluation is typically initiated in July with the General
Manager providing information to the Board using the Annual Self Planner so the
evaluation can be completed in August. The Mid-Year Planner is completed by
the General Manager in January of each year so that any changes in General
Manager's goals and priorities can be considered, and the GM and Board can
discuss the General Manager's progress.
7.2 If the General Manager is on a leave of absence at the time of the regularly
scheduled review or interim review, the evaluation will be deferred by about the
same number of days.
stop Parties Involved and Major Activities
1 GM submits Annual Self Planner to Board members by July 15.
2 Steering Committee Liaison submits blank General Manager Performance Appraisal
Forms to Board members.
3 Board members completed draft Management Appraisals and submit to Steering
Committee Ilaison Ju 31'r
4 Steering Committee cwmgiles performance appraisal results and submits to Board
members by August 15 , using Compensation Matrix to determine eligibility for
compensation Increase.
5 Copy of Performance Appraisal and Compensation Matrix submitted to General
Manager at least five days in advance of study session.
5 Steering Committee conducts performance appraisal interview with General Manager
to discuss findings and recommendationsfor the new performance year prior to August
31; final comments incorporated, copies distributed, inducing copy to personnel file.
Pay increases or lump sum bonuses, if provided, effective with first payroll period in
September, retroactive of base a increases to Jul 1°.
DRAFT GM Performance Appraisal Guidelines Page 6
8.0 How is the GM appraisal completed and scored?
8.1 The overall rating consists of one of the five following rating categories: 'Does Not
Meet Job Expectations, Marginally Meets Job Expectations, Meets Job
Expectations, Exceeds Job Expectations, and Far Exceeds Job Expectations'. If
a competency or goal cannot be rated, a score would not be shown in the
calculation of the overall rating score.
8.2 Board members must rate each competency and goal. Specific and edited
comments are required by the supervisor for all rated competencies and goals,
regardless of the performance rating that is assigned.
8.3 Corrective action steps will be established if the General Manager receives any
collectve Board rating of 'Marginally Meets Job Expectations' or 'Does Not Meet
Job Expectations' on a rating criteria when the appraisal is completed and
scored. At a minimum, a follow-up interim evaluation (e.g., one month, two
months, or three months later) will be conducted if the General Manager receives
a rating of'Does Not Meet Job Expectations'.
8.4 The goals will have already been weighted for the current evaluation period by
the Board. The total overall performance rating will normally be computed for the
General Manager using the weighted average of the individual goals. The
weighted average mean will be computed by taking the sum of the adjusted
scores (weighting x rating)/number of rating categories.
8.5 For the General Manager, the Goals Section is weighted at 76% of the total
overall performance rating, and the Competencies Section is weighted at 25%
this total overall performance rating.
DRAFT GM Performance Appraisal Guidelines Page 7
9.0 How is the Compensation Matrix in determining the General Manager's
eligibility for increased compensation, and what other steps are involved?
9.1 The Compensation Matrix is designed to provide an objective and convenient
means of determining whether the General Manager is eligible for increased
compensation, and the actual amount.
9.2 An annual market compensation survey is completed of the District's labor
market agencies for the General Manager's position in July to establish the
market rate and projected salary increases for the General Manager in relation to
the Board's overall performance rating.
9.3 The General Manager's current salary rate is shown in relation to the market
average using the Compensation Matrix. The Board may elect to have staff or an
independent consultant conduct the market analysis and or update the matrix for
the Board's use each year.
9.4 Completed performance evaluations for Management positions must be sent to
Human Resources Department following their review at the department level.
Secondarily, the performance evaluations will be reviewed by the General
Manager, with the original being maintained in the employee's personnel file as
the official record. Pay increases for eligible employees will not be instituted
without an approved performance appraisal. Examples are provided in the matrix
so the Steering Committee will understand how it works during the regular
performance review.
10.0 What other administrative features are involved in evaluating the General
Manager, updating the Compensation Matrix, and maintaining these files?
10.1 The Steering Committee will be responsible for designating a Liaison who will be
responsible for submitting the blank General Manager Performance Appraisal
electronically to the Board members, collecting the responses, and tabulating the
results using the GM Performance Evaluation Scoring Worksheet. On many
committees in industry, the Chair, Vice Chair, or Steering Committee member
with Human Resources experience would serve in this role.
10.2 General Manager pay increases or lump sum bonuses are typically retroactive to
the first payroll period in July.
DRAFT GM Performance Appraisal Guidelines Page 8
Exhibit f- Setting Goals: Generating Ideas
SAMPLE GOALS FOR A LOCAL CITY MANAGER
Priority Element/Criteria Random Order Milestone/Parties Evaluated
1.Staffing: Maintain a ratio of staff positions to City Actual Staff Payroll Does Not
operating budget that does not exceed x$for FY2004-2005. Exceed x$Par Employee Based
On Year-End Expenditure
Recap.
2.Short-Term Budget Controls:Actual Power Plant budget Actual Staff Payroll Does Not
expenditures=or<than planned budget expenditures for Exceed x$Per Operating
FY2004-2005. Expenditure Recap At Year-End.
3.Compliance: Zero audit deficiencies or violations cited and Department head YTD activity
filed by state and federal agencies regulating the City during report for regulatory compliance
FY2004-2005. activity.
4.Short-Term Budget Controls: Obtain at least x$ or more Budget recap of grant fund
new grant revenues for Council priority programs for FY20D4- revenues by department and
2005. program submitted on March 31,
2005.
S.Short-Term Budget Controls: Actual total operating Budget recap comparisons:4
expenditures=or< planned operating expenditures in budget quarter of 2003-2004 plus first
plan for salary 8 benefits, maintenance 8 operations, capital three quarters of 2004-2005.
outlays, and allocations.
6.Lono-Term Financing: Increase General Fund Reserves Audit report of General Fund
by approximately$500,006 during FY 2004-2005,without Reserves by Director of Finance
sacrificing any of the Council's priorities established in the submitted on March 31, 2005.
performance goals.
7.Land Use Plannino: Draft New Zoning Ordinance on Council Action Vote by
schedule subject to approval by Council. December 31,20D4 based on
staff report.
8.Conservation: Complete DSF Habitat Conservation Plan Council Action Vole by
and/or file strategy plan for legislative changesAitigation with December 31, 2004 based on
regards to the DSF and USFWS. staff report.
8.City Infrastructure: Completion of reorganization plan Tasks completed in accordance
and City Hall Rennovation Plan. with schedule and within budget
an submitted to Council.
10. Utility Management: City's solid waste contract a cable Contract renewed on schedule
television franchise contract renewed under basic service and within budgetary and service
provisions established by the City Council and within a total guidelines.
fee increase of<8%.
Exhbit 2r Setting Priorities and Goals: Generating Ideas
10 EXAMPLES OF PALO ALTO COUNCIL WORK PLAN PRIORITIES
AT THE CITY MANAGER LEVEL
The top 5 Council Priorities are: Long-Term Finances, Infrastructure, Land Use Planning,
Alternative TransportatioNTraffic Calming, and Affordable/Attainable Housing.The City Council
has established a fairly large number of Work Plan goals for 2002-2003 in concert with these
priorities. For performance evaluation purposes, it is recommended that a smaller number of
examples be used that have high Impact and are difficult to attain.
Prior[ Element/Criteria Random Order M[Iestonefloarties Evaluated
1.Land Use Planning: Housing Element Update presented August 31, 2002 and
to Planning and Transportation Commission for review& October 31,2002
comment and then to City Council for review and adoption. Planning
2.Infrastructure: Complete final design for Children's November 30,2002 and
Library,final design for Mitchell Park Library and Community February 28, 2003 and July 31,
Center and begin construction of Children's Library on 2003: Public Works and
schedule and within established budget. Community Services
3. Long-Ranee Financing: Present plan fee package for September 30,2002 Team: City
November, 2002 Bond Measure financing plan and Attorney and ASD
Community Outreach Program; Council approves;action.
4.Infrastructure: Develop Storm Drain measure for properly October 31,2002 and
owner election given recommendations for storm drain December 31,2002 and
funding from BRC, Council approval of storm drainage March 31,2003 City Attorney and
funding Ian; and completion of election. City Clerk
5.Affordable/Attainable Housing: Opportunity Center December 31,2002
Housing Development Proposal presented to Planning And April 30, 2003
Commission/Architectural Review Board and to City Council P&CEIPlanning
for action in Spring,2003
6. Infrastructure: Homer Avenue Caltrain Undercrossing: Grant Funding:
secure 80%or more of required grant funding, 2003(action February 28,2003
subject to the approval of the P&TC; project submitted within Initiation of Construction:
Council guidelines. April 30,2003 City Attorney and
Infrastructure Team
7.Lana-Range Finances: Complete Phase II of December 31,2002 and June
Development Impact Fee program for City Wide 30,2003 City Attorney, Planning
Transportation by finishing Nexus Transportation Model and and ASD.
Circulation Improvement Plan on time and within budget.
8.Infrastructure: Streamline Contracts Administration October 31,2002: includes City
process and present recommendations to City Council for Attorney and Infrastructure Team
approval.
9.Alternative TransoortationfTraHic Calming: Complete July 30,2002 and
Bicycle Master Plan and California Avenue Bicycle and September 30,2002
Pedestrian Under Crossing Conceptual Plan/Feasibility Study P&CEIPlanning,Transportation
on schedule and within budget. with VIA,and JPB
10. Land Use Planning: Draft New Zoning Ordinance and January 31,2003 and Meroh 31.
Complete New Zoning Ordinance on schedule and approvetl 2003 P 8 CEIPlanning&City
by Council. Mane erBCi Attome
2
Exhibit 3: Auditing Programs- Examples From A Sample City:
Sample Ideas- Council Priorities: Numbers/Dates Are For Illustration Only
1. Present independent analysis of City's Long-Tenn Financial Plan for review by
Finance Committee by mo/dytyr and within budget.
2.Achieve minimum Sales Tax Audit Recoveries at an annualized rate of$250,000
for FY 2004-2005.
3. Complete independent audit of effectiveness of City's Code Enforcement
Program to Policy and Services Committee by mo/dy/yr, implement 80%or more of
auditor recommendations by 06/30/05.
4. Finish assessment of Utility Risk Management Procedures for review and
approval by Utilities Advisory Commission and Finance Committee by mo/dytyr.
5. Provide timely and accurate advice to other CAOs regarding internal procedures
and controls as shown by customer satisfaction scorecard.
6. Complete audit of 06/30/05 City Financial Statement on time and within budget.
7. Finish independent study of Infrastructure Contract Processing Times with
CityWorks Contract Streamlining Project Team by moldy/yr, reduce average
processing time for qualified contractors by x days by 06/30/05.
B. Complete reviews of Financial Procedures and Controls for designated
departments by 09/30/05.
9. Provide Quarterly Status Reports and Annual Audit Plan on schedule and in
accordance with Council expectations regarding format and commentary.
3
ORANGE COUNTY SANITATION DISTRICT GENERAL MANAGER PERFORMANCE APPRAISAL
RATINGS SCORESHEET
� NlNE
MEMO!!o
on�000000000�oo��00000000mmo
0000000000�0000000mmEmm
o�000�a�000��000�ooMIENS om�m
oo�0000�0000�000�00000000mmm
000000�000��000�00�000000�mm
00000000000000000000o���ao��mm m
00000000000000000000-0000��0
00000000000O0Ot�000 oOopOpp 0 pm
o��0000000000000000000000mmm
----------------------------
0000000000000000000000000mmo
MEMO
• -. .,. o0000000000000�0000000000mmm
- �000000000000000000000000mom
000000000000000000-0000�ommm
.. .. 0000�00000000000000000000mmo
ENGINE_oMENOMINEE
_o_o_o_o_o_o_o_�_oo_o��00000�0000mmo
0000000000000000000000000m NMI NMI
----------------------------
0000�000000000000000000000a�a
00000000000000000000000000-0
.... - '.. . . �a—00000000000�000000000000-0
000000000000000000000�0000ao
----------------------------
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
Orange County Sanitation District
Wednesday, July 5, 2006—5:00 P.M.
A meeting of the Operations, Maintenance and Technical Services Committee of the Orange
County Sanitation District was held on July 5, 2006, at 5:00 p.m. in the Sanitation District's
Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
OMITS Directors Present: Staff Present:
Carolyn Cavecche, Chair Jim Ruth, Interim General Manager
Don Bankhead, Vice Chair Nick Arhontes, Director of Reg. Assets & Services
Sukhee Kang Bob Ghirelli, Director of Technical Services
Ken Parker Jim Herberg, Director of Operations & Maintenance
David Shawver Lilia Kovac, Committee Secretary
Dave Sullivan Ed Torres, Engineering Manager
Doug Davert, Board Vice Chair
James M. Ferryman, Board Chair
Others:
Norbert Gaia
Juanita Skillman
Simon Watson
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Chair Cavecche had no report.
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, had no report.
(6) CONSENT CALENDAR ITEMS
a. Approve minutes of the May 3, 2006 Operations, Maintenance and Technical Services
Committee meeting.
Minutes of the Operations, Maintenance
and Technical Services Committee _
July 5, 2006
Page 2
b. OMTSO6-31 Receive and file Technical Services Monthly Report, which focuses on
regulatory biosolids and performance measures for the Technical
Services Department.
C. OMTS06-32 Receive and file Operations& Maintenance Monthly Report, which
focuses on compliance,financial data and performance measures for
Operations and Maintenance Department.
d. OMTS06-33 Receive and file Regional Assets and Services Monthly Report for the
months of April and May which focus on current business information,
performance trends and financial information of the business units.
e. OMTS06-34 Receive and file Information Technology Quarterly Report,which focuses
on current performance trends and key technology business applications.
Motion: Moved, seconded and duly carried to approve the recommended actions
for items specked as 6(a)through (a) under Consent Calendar.
(7) ACTION ITEMS
a. OMTS06-35 Recommend to the Board of Directors to authorize the General Manager
to accept a credit of$76,098 for Trunkline Chemical Treatment Strategy
in the Miller-Holder, Knott and Baker-Gisler Trunklines with US Peroxide,
Inc., and to utilize said credit for the relocation of the Seal Beach Pump
Station chemical dosing tank by US Peroxide, Inc.
After much discussion on the use of the credit owed to the Sanitation
District, a motion was made to direct staff to submit various options
available, acquiring a firm quote for the relocation of the tank, and
surrounding the tank with various types of screening.
Motion: Moved, seconded and duly carried to direct staff to accept the credit due
to the Sanitation District in the amount of$76,098, and to submit to the
Committee various city-approved options to obstruct the view of the
dosing tank from the public.
(8) INFORMATIONAL ITEMS
There were none.
(9) REPORT OF DIRECTOR OF INFORMATION TECHNOLOGY.
Patrick Miles, Director of Information Technology, was absent.
Minutes of the Operations, Maintenance
and Technical Services Committee
July 5, 2006
Page 3
(10) REPORT OF DIRECTOR OF OPERATIONS AND MAINTENANCE
Jim Herberg, Director of Operations and Maintenance, had no report.
(11) REPORT OF DIRECTOR OF TECHNICAL SERVICES
Director of Technical Services, Bob Ghirelli, reported that on July 2e, the Sanitation District will
host a delegation from South Korea Ministry of the Environment to learn how the Sanitation
District does business, manages its sewers, handles its construction projects, and the
Groundwater Replenishment System.
(12) REPORT OF DIRECTOR OF REGIONAL ASSETS AND SERVICES
The Director of Regional Assets and Services, Nick Arhontes, reported that the State Water
Resources Control Board is issuing Notices of Intent(NOI)to enroll for coverage under the new
statewide General Waste Discharge Requirements Order(GWDR). The Sanitation District has
received three; the regional collection system, the portion of local sewers in Tustin the
Sanitation District owns and operate, and the local sewers in unincorporated areas of North
Tustin and El Modena. The annual fee for each is based on population served and is $872.00
per year for less than 50,000 served and $4676.00 per year above 50,000. The Sanitation
District's member cities and sewering agencies should be receiving similar NOls. It was noted
the deadline for enrollment in the GWDR is November 2, 2006.
(13) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
a. O1VTTSO6-36 Independent Review of Operations and Maintenance Resource Needs
Jim Herberg, Director of Operations and Maintenance, reviewed a scope of work for an
independent review of the Operations and Maintenance, and Regional Assets and
Services Departments..A brief overview of the recently completed O&M Staffing Study
that was completed in the spring of 2006 was also provided.. After much discussion, the
committee directed staff to not proceed with this study, and thanked staff for the work.
(14) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
The Committee expressed interest in receiving an update in September on the SARI line, its
history, current issues, and information on the SAWPA agreement.
(15) FUTURE MEETING DATES
The next Operations, Maintenance and Technical Services Committee meeting is scheduled for
September 6, 2006, at 5:00 p.m.
Minutes of the Operations, Maintenance
and Technical Services Committee
July 5, 2006
Page 4
(16) CLOSED SESSION
There was no closed session.
(17) ADJOURNMENT
The Chair declared the meeting adjourned at 6:10 p.m.
Submitted by:
Lili Kovac
Committee Secretary
Operations, Maintenance and Technical Services
M:1dep6agenda\OMTS2006W7061070506 dmft OMTS MinUWAOC
u
MINUTES OF PLANNING, DESIGN, AND CONSTRUCTION
COMMITTEE MEETING
Orange County Sanitation District
Thursday,July 6,2006, at 5 p.m.
A meeting of the Planning, Design,and Construction Committee of the Orange County
Sanitation District was held on Thursday, July 6, 2006,at 5 p.m., in the Sanitation District's
Administrative Office.
(t) ROLL CALL
The roll was called and a quorum declared present, as follows:
PDC COMMITTEE MEMBERS:
Directors Present: Staff Present:
Norm Eckenrode, Vice Chair David Ludwin, Director of Engineering
Charles Antos John Linder, Engineering Manager
Alberta Christy Tod Haynes, Construction Manager
Larry Crandall Matt Smith, Engineering Manager
Patsy Marshall Chris Cervellone, Engineering Supervisor
Roy Moore Chuck Winsor, Engineering Supervisor
Doug Davert, Board Vice Chair Juanita Skillman, Records Management Specialist
Penny Kyle, Committee Secretary
Directors Absent:
Steve Anderson Others Present:
Jim Ferryman, Board Chair
Tod Ridgeway, Chair
Harry Sidhu
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were none.
(4) REPORT OF THE COMMITTEE CHAIR
Committee Vice Chair Norm Eckenrode did not make a report.
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, was not present.
S
PDC Committee Minutes
Page 2
July 6, 2006
(6) REPORT OF THE DIRECTOR OF ENGINEERING
David Ludwin, Director of Engineering, provided updates on the Bushard Trunk Sewer project
and the Santa Ana River Interceptor line. He further reported the approximate cost to have an
independent review on the Capital Improvement Program would be $200,000 to $250,000. The
American Society of Civil Engineers(ASCE)would be able to review the department's
management procedures and processes for approximately$20,000 to $25,000. The PDC
Committee directed staff to proceed with the review by ASCE,and to not go forward with the
independent review of the CIP.
(7) REPORT OF GENERAL COUNSEL
General Counsel was not present
(8) CONSENT CALENDAR
a. APPROVED MINUTES OF PREVIOUS MEETING
Approve minutes of the June 1, 2006 Planning, Design, and Construction Committee
Meeting.
b. CHANGE ORDER REPORTS
Action on change orders that require PDC Committee or Board approval will be taken
separately. There are six change orders this month for PDC approval.
C. PSA AND AMENDMENT REPORT
Action on PSAs and Amendments that require PDC Committee or Board approval will be
taken separately. There were no PSAs and no Amendments approved by the General
Manager from May 19 through June 22, 2006.
d. FACILITIES ENGINEERING CONSULTANT ACTIVITY REPORT
This report is an information only item.
e. SANTA ANA RIVER INTERCEPTOR RELOCATION AND PROTECTION STATUS
REPORT
This is an information only item.
f. BUSHARD TRUNK SEWER REHABILITATION REPORT
This is an information only item.
g. QUARTERLY GROUNDWATER REPLENISHMENT SYSTEM (GWRS) STATUS
REPORT
This is an information only item.
PDC Committee Minutes
Page 3
` July 6, 2006
MOTION: It was moved, seconded, and duly carried to approve the recommended actions
specified as Items 8(a)through (g).
END OF CONSENT CALENDAR
(9) ACTION ITEMS
a. PDCO6-62 Item was removed.
b. PDCO6-63 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify Change Order No. 9 to Secondary Treatment
Facilities Process Upgrades at Plant No. 2,Job No. P2-47-3,with
Morrow-Meadows Corporation,authorizing an addition of$82,199,and
100 calendar days, increasing the total contract amount to $7,344,607.
C. PDC06-64 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to: (1) Ratify Change Order No. 3 to Santa Ana River
Interceptor, 2005 Emergency Repairs from 10,000 CFS Release, Contract
No. 2.41-48, with Ken Thompson, Inc.,authorizing an addition of$15,700
and 50 calendar days, increasing the total contract amount to
$1,446,273.; and,
(2)Accept Santa Ana River Interceptor, 2005 Emergency Repairs from
10,000 CFS Release, Contract No. 2-41-4B, as complete, authorizing
execution of the Notice of Completion and approving the Final Close Out
Agreement.
d. PDCO6-65 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify Change Order No. 9 to Gisler-Redhill Trunk
Improvements, Reach W, Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk
Improvements, Contract No. 7-41; and City of Tustin Project Nos. 6106
and 6151, with AIRS, Inc., authorizing an addition of$643,271, increasing
the total contract amount to $21,534,951.
e. PDC06-66 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify Change Order No. 1 to Activated Sludge Plant
Rehabilitation at Plant No. 1,Job No. P1-82,with J. R. Filanc Construction
Company, Inc., authorizing an addition of$149,078 and a time extension
of 101 calendar days, increasing the total contract amount to 32,342,078.
I. PDCO6-67 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 2 to the Professional Services
Agreement with Brown and Caldwell to provide additional design services
for Trickling Filters at Plant No. 2, Job No. P2-90,for an additional amount
of$397,680, increasing the total amount not to exceed $10,083,220.
PDC Committee Minutes 1
Page 4
July 6, 2006
g. PDCO6-68 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 3 to the Service Contract with
NRG Thermal Services, LLC, providing for additional field services for Air
Quality Improvements,Job No. J-79,for an additional amount of$90,483,
increasing the total amount not to exceed $2,338,437.
h. PDCO6-69 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 1 to the Professional Services
Agreement with Earth Tech, Inc.for Bushard Trunk Sewer Rehabilitation,
Job No. 1-2-4, providing for the additional construction management
services, for an additional amount of$478,693, increasing the total
amount not to exceed $2,531,286.
i. PDCO6-70 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 8 to the Professional Services
Agreement with Brown and Caldwell, providing for additional engineering
services for Primary Clarifiers 16-31 and Related Facilities, Job
No. P1-37,for an additional amount of$588,575, increasing the total
amount not to exceed $6,787,436.
j. PDCO6-71 MOVED,SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 1 to the Conveyance,
Disassembly and Abandonment Agreement with the International Bay
Clubs, Inc. regarding the existing Rocky Point Pump Station, extending
the abandonment deadline by three years.
k. PDCO6-72 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve grant funding for the following Cooperative
Projects:
(1)$300,000 for Garden Grove Sanitary District for Closed Circuit
Television (CCTV)inspection and sewer condition assessment; and,
(2)$325,000 for the City of Cypress for CCTV inspection and sewer
condition assessment,for a total of$625,000.
I. PDCO6-73 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify use of the General Manager's emergency purchasing
authority, Resolution No. OCSD 99-23,for Purchase Order Nos.50018-
OS, 52747-OS, 53411-OS,and 55070-OS issued to Frost Company for a
total amount not to exceed $224,000 for emergency repairs to the critical
process equipment installed in the Solids Storage and Truck Loading
Facility, Job No. P2-60.
M. PDCO6-74 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify Change Order No. 19 to Bushard Trunk Sewer
Rehabilitation,Job No. 1-2-4,with Steve P. Rados, Inc., authorizing a
credit of$4,358,204,decreasing the total contract amount to$30,528,502.
(10) CLOSED SESSION
There was no closed session.
PDC Committee Minutes
Page 5
July 6, 2006
(11) OTHER BUSINESS.COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There were none.
(12) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(14) FUTURE MEETINGS DATES
The next Planning, Design, and Construction Committee Meeting is scheduled for Thursday,
August 3, 2006 at 5 p.m.
(16) ADJOURNMENT
The Chair declared the meeting adjourned at 5:49 p.m.
Submitted by:
Penny M. ( le
Committee Secretary
H9dept\agendaWDC12006YMinutes1010806 daft PDC Minutes.dm
PDC COMMITTEE Meeuny Dare TOBd.Or Dir,
W/06106 W/1�106
AGENDA REPORT Rem 06mtle Rem Numbe
Pm Numb 1
Orange County Sanitation District
Secondary Treatment
FROM: David A. Ludwin, Director of Engineering
Originator: Bob Schirripa, IPMC Project Manager
SUBJECT: SECONDARY TREATMENT FACILITIES PROCESS UPGRADES AT
PLANT NO. 2, JOB NO. P247-3
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 9 to Secondary Treatment Facilities Process Upgrades at
Plant No. 2, Job No. P247-3, with Morrow-Meadows Corporation, authorizing an
addition of$82,199, and 100 calendar days, increasing the total contract amount to
$7,344,607.
SUMMARY
• Job No. P247-3 provides for the rehabilitation of electrical equipment,
instrumentation, and controls for the secondary treatment facilities located at Plant
No. 2.
• Lee & Ro prepared the plans and specifications and the contract was awarded to
Morrow-Meadows Corporation on September 24, 2003.
• Change Order No. 9 includes twelve items of added work, one time extension item,
and a reduction in retained funds. There are eight nonreimbursable design errors
and one reimbursable design error associated with this change order. The contract
includes liquidated damages at $2,000 per day and no bonus provisions. The
project is now 99% complete.
PRIOR COMMITTEEIBOARD ACTIONS
The contract was awarded by the Board of Directors on September 24, 2003. Please
refer to the attached Change Order Status Report for information on all previous change
orders.
PROJECTMONTRACT COST SUMMARY
Original Contract Price $ 4,712,000
Previously Authorized Changes $ 2,550,408
This Change (add)(dedustI $ 82,199
Change Orders to Date $ 2,632,607
Percentage Increase to Date 55.87%
Amended Contract Price $ 7,344,607
Page 1
BUDGETIMPACT
® This item has been budgeted. (Line item: Section 8 — Page 64)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information Rem)
ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date November 6, 2003
Original Contract Completion Date March 4, 2005
Total Number of Change Orders to Date 9
Current Contract Completion Date May 31, 2006
Projected Contract Completion Date July 31, 2006
Actual Completion Date N/A
Days Subject to Liquidated Damages N/A
Change Order No. 9 Content
Description Amount Days Type
Item
No.
Reimbursable Design
1 Replace Contract Specified Cable 1,693 0 Error
Return Activated Sludge (RAS)Maste
Activated Sludge (WAS) Wiring Nonreimbursable
2 Removal 1,193 0 Design Error
Nonreimbursable
3 Isolation Valve Addition at RAS 3,358 0 Design Error
Additional Trenching between JB-1
4 and District 5 and 7 Stations 28,084 0 Unknown Condition
5 Additional Conduits at Basin "L" 5,418 0 Unknown Condition
Nonreimbursable
6 Signal Conditioner Addition 3,178 0 Design Error
Nonreimbursable
7 Additional Enclosures at RASNVAS 4,032 0 Design Error
Additional Wire Tag Numbers and Nonreimbursable
8 Documentation 17,200 0 Design Error
9 Replace Corroded Vent Fan Controller 3,020 0 Unknown Condition
Nonreimbursable
10 Isolate 12Kv Monitoring Circuits 363 0 Design Error
Additional Programmable Logic Nonreimbursable
11 Controller Inputs 11,783 0 Design Error
Nonreimbursable
12 Cable Tray/Buss Grounding Addition 2,877 0 Design Error
13 Time Extension 0 100 Other
Page 2
14 Retention Reduction 0 0 Other
+ Total Change Order No. 9 $82,199 100
Item 1 involves the labor and material to remove 16 gauge cable and replace it with 24
gauge cable between the programmable logic controller (PLC) and variable frequency
drives (VFD) in the activated sludge systems. This item involves re-work and the
Sanitation District will be seeking reimbursement from the Design Consultant.
Item 2 removes all existing RASNVAS wiring between the pressure switches and the
VFDs. Removal of the wiring is required to improve safety to operating personnel and
was not included in the contract documents.
Item 3 adds nine isolation valves and one diaphragm seal on the RAS pipelines. The
Contractor discovered the badly corroded equipment during the construction phase of
this project. The modifications were required in order to facilitate future maintenance of
the pressure switches.
Item 4 performs additional trenching in order to determine an underground fiber optic
conduit route to the hydrogen peroxide station. This extra work was required as a result
of several unknown underground conflicts which were discovered during construction.
The conflicts included two unforeseen concrete encasements, one duct bank, and a
storm drain which required an entire reroute of the specified fiber optic conduits. The
work included potholing, backfill of the original trench, additional asphalt, additional
compaction, and additional excavation required for the new trench.
Item 5 adds conduit from the Scott tunnel to the basin "L" controller. As a result of
excessive corrosion, the Contractor was not able to re-use existing conduit as required
pursuant to the contract documents.
Item 6 requires the addition of a signal conditioner at the OASES control panel. This
addition was required to correct an omission from the contract documents in order to
provide an operable system and provide process information to Sanitation District
Operation's staff. The Contractor was required to purchase the signal conditioner, and
the operator (Air Products) of the Oxygen Plant was required to install the signal
conditioner to comply with their maintenance agreement with the Sanitation District.
Item 7 provides new enclosures for the contract supplied isolators at the RASNVAS
VFDs. The enclosures were omitted from the contract documents, and were needed to
comply with the Underwriters Laboratory (UL) listing requirements.
Item 8 provides tagging information and documentation for several electrical panels
within the project areas in the plant. This additional work was required to correct an
omission and comply with the Sanitation District's tagging standards and protect the
new VFDs installed under this contract.
Item 9 replaces the vent fan controller in the East RAS basement. The Contractor
discovered the corroded, nonoperational existing vent fan during construction.
Replacement of the fan was required to provide adequate ventilation and safe working
conditions.
Page 3
Item 10 isolates existing power monitoring circuits for the 12Kv switchgear located in the
Distribution "B" Electric Room. The 12Kv switchgear is being replaced as part of Job
No. J-33-11A. The J-33-IA switchgear incorporates its own power monitoring which was
not known during the design of this project. Therefore, the power monitoring circuits
were required to be secured and isolated in lieu of being terminated as specked.
Item 11 provides PLC inputs for the three Uninterruptible Power Supply Systems. The
requirement was needed to prevent a potential unsafe condition due to lack of alarms
associated with the oxygen system and to cored an omission.
Item 12 provides a grounding electrode on the cable tray system in order to correct an
omission and comply with the National Electric Code.
Item 13 is for a time extension in order to accommodate numerous non-contract related
problems encountered during start-up of the west side Aeration Basins. The majority of
the delays are associated with the failure of the Sanitation District owned or supplied
equipment. The Contractor submitted a time impact analysis and a request for a time
extension that was reviewed and approved. The result is a 100 day time extension to
the contract for which the Contractor has agreed to be non-compensable. Presently
there are changes to the project that have been issued to the Contractor but have not
been finalized. Some of these changes will involve an additional contract time
extension which will be included in a future change order.
Item 14 reduces the Contractors retention from ten to five percent. The project is 99%
complete. As a result, staff recommends a reduction of retention as requested by the
Contractor pursuant to the Contractor's letter dated February 2, 2006.
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the Strategic Plan EIR that was certified on
October 27, 1999. A Notice of Determination was filed on October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order
5. Location and Photo Description of Change Order
CH:dm
H:WgkZaMgenda Draft Repmts�MP2i7-3 AR CO#901060 ,.
Page 4
BUDGET INFORMATION TABLE
SECONDARY TREATMENT FACILITIES PROCESS UPGRADES AT PLANT NO. 2
P2-47-3
PROPOSED
ORIGINAL CURRENT PROPOSED FUNDS THIS - ESTIMATED ESTIMATED
BUDGET. PROPOSED TOTAL
PROJECT/PHASE AUTHORIZED . PROJECT REVISED AUTHORIZED TO AUTHORVSTION EXPENDITURE DAM
EXPENDED DAT (% TO
INCREASE
BUDGET BUDGET — BUDGET DATE REpUEST . TO GATE DATEI%)
/DECREASE
ples.0 I-P,.Wj Devebpl0ael S - S 260 $ - $ 260 $ 260 $ - 5 260 $ 280 100%
Phase 2-Prelmu Des a S 6000 S 6427 3 - $ 6427 $ 6.427 S - $ 6,427 $ 6,427 1m
Phew 3-Desigh S 677,002 13 709,134 S 709,134 -` $ 709,134 S 709.134 S 708.846 100%
Phase 4-Combed'mn $ 6,697,000 $ SAW.093 S 32199 $ 9.702,292 $ 9.620,093 S . 82199 S 9702,292 S 6.127.102 84%
ft.5-Commiuiod S 158.906 S 358,906 S 358906 :- $ 358,906 S 358,905 $ 302.502 N%
Pbese 6-Close4 $ 39.977 S 39.977 3 - S 39.977 S 39.977 $ - $ 39.977 S 131 0%
Pbese 7-C9nfm S 1.124.115 S 736JHS $ 02.19 S 653,889 $ - S - S - $ 0%
PROJECT TOTAL 3 E.703,000 $ 11.470,885 S - 3 11.470865 - 3 10,734,797 S $2.199 $ 101816.996 S 9.146,268 85%
Reenboraeb4 Cosb 0%
PROJECT NET S 8,703.000 I S Lt,470,885 S -IS 8.708000 1 .. S 10,734797 1$ 82.199 $ 10,816,996 S 9.145.28$ 65%
PSA/Cmntrabt
Desicin PSA is 637,709 1$ 637.70918 S 637709 11$ 637709 3 - 3 637.7011 1 3 614,815 96%
C slhjdion Con $ 5,617.217 1$ 7,262A08 1 3 $$139 1 S 7,344,607 -' $ 7,262.408 1$ 82,199 $ 7,344,607 S 7,261,230 I 99%
EDI806M1CM7
CHANGE ORDER STATUS REPORT
SECONDARY TREATMENT FACILITIES PROCESS UPGRADES AT PLANT NO. 2
JOB NO. P2-47-3
APPROVAL CONTRACT CONTRACT COST CUMULATIVE AUTHORIZED AUTHORIZEDTIME
ITEM PERCENTAGE TIME TO DATE
DATE COST TO DATE INCREASE (DAYS) (DAYS)
CONTRACT 9Q4/2003 $4,712,000 $4,712,000 0.00 485 485
CO NO. 1 1027/2004 $205.903 $4,917,903 4.37 0 485
CO NO.2 121152004 $12,765 $4.930,668 4.64 0 485
CO NO. 3 2232005 $331,811 $5,262,479 11,11 0 485
CO NO.4 3232005 $526,960 $5,789,437 22.87 215 700
CO NO.5 5252005 $95,602 $5,885,039 24.89 0 700
CO NO. 6 8242005 $31,879 $5,916,918 25.57 21 721
CO NO. 7 12/172005 $94,137 $6.011.055 27.57 99 820
COO !Fr2 06 $.1,:,261,353 . $7,262,408 4!813 170 837
$82,199 93ZN hlg 7 .
EDMS 003810854
CHANGE ORDER PERFORMANCE REPORT
SECONDARY TREATMENT FACILITIES PROCESS UPGRADES AT PLANT NO.2
JOB NO.P2-47-3,CHANGE ORDER NO.9
Contractor MORROW-MEADOWS CORPORATION Project Type:REHABILITATION
Design Consultant:LEE 3 RO Conlrsal Complete.100% Original Contract Price: $4.712.000
CHANGE ORDER TYPES TRACKED INFORMATION ONLY
Unknown Cond6tan StallRpuested Change Reimbursable Design NonAahbumable Oesign Subtotal CO Types Other Total
Errors Errors Tracked'
Change Orden $40564 0.88 80 0.00% $1.693 0.04% $39.952 0.85% $52.19 1.74% $0 0.00% 582,199 1.74%
this Period
Change Orders to 544.575 0.95 $152,971 3.25% $36,261 0.77% $104,24 2.21% $338,O53 7.17% $2,212,355 46.95% $2,550.408 54.13%
Data
Change Order Total 585,129 1.81% $162.971 3.26% 337,954 0.81% $144.19 3.06% $420,252 8.92% $2,212,355 46.95% $2,632,607 55.87%
Program <3.00% <1.00% 0.00% <1.00% <5.00% 0.00% <5.00%
Performance Goals
'The Change Order Management Plan race;ere preceding four change order types
Wre W$1200e
EDMS00301110
Page 1 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine 9
Date: July 19, 2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee& Ro
Amount of this Change Order(Add) $82,199.00
In accordance with contract provisions,the following changes in the contract and/or contract
work are hereby authorized and as compensation,the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 - REPLACE CONTRACT SPECIFIED CABLE
This item is for labor, material, and equipment needed to replace 200 feel of contract specked 16
gauge twisted shielded pair cable with 24 gauge from the Return Activated Sludge(RAS) and Waste
Activated Sludge (WAS) Programmable Logic Controller(PLC)to the Return Activated Sludge(RAS)
Pump Variable Frequency Drives(VFDs). The contract documents specify a cable that is not
acceptable on Schneider Modbus Plus Network Taps. The work associated with this change order
item was accomplished by the Contractors force account in accordance with Division 1, Section
443.1 of the General Requirements(Reference FCO054).
ADDED COST THIS CHANGE ORDER ITEM: $1,693.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2 -RASIWAS WIRING REMOVAL
This item is for labor, material, and equipment needed to remove all existing wiring between the
RASMAS discharge pressure switch and the RASIWAS VFDs. The pressure switches and wiring
were replaced as part of the contract work. The provision to remove the existing wiring was omitted
from the contract documents. For safety reasons, it is not the Sanitation District's policy to abandon
wiring in place. As a result,the Contractor was required to remove the existing wiring. The work
associated with this change order item was accomplished by the Contractor's force account in
accordance with Division 1, Section 44.B.1 of the General Requirements(Reference FCO057).
ADDED COST THIS CHANGE ORDER ITEM: $1,193.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 2 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine 9
Date: July 19 2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P247-3
Consultant: Lee& Ro
ITEM 3 -ISOLATION VALVE ADDITION AT EAST RAS
This item is for labor, material, and equipment needed to install nine new%inch isolation valves and
a diaphragm seal on the east and west RAS Pipelines. During the construction phase of this project,
some of the isolation valves and a diaphragm seal were found to need replacement due to excessive
corrosion. The isolation valves are needed to facilitate removal of the pressure switches required for
future maintenance work. The work associated with this change order item was accomplished by the
Contractor's force account in accordance with Division 1, Section 44.B.1 of the General Requirements
(Reference FCO059).
ADDED COST THIS CHANGE ORDER ITEM: $3,358.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4 -ADDITIONAL TRENCHING BETWEEN JB-1 AND DISTRICT 5 AND 6 STATIONS
This hem is for labor, material, and equipment needed to provide additional in order to determine an
underground fiber optic conduit route to the hydrogen peroxide station. This extra work was required
as a result of several unknown underground conflicts which were discovered during construction. The
conflicts included two unforeseen concrete encasements, one duct bank, and a storm drain which
required an entire reroute of the specified fiber optic conduits. The work included potholing, backfill of
the original trench, additional asphalt, additional compaction, and additional excavation required for
the new trench. The work associated with this change order hem was accomplished by the
Contractor's force account in accordance with Division 1, Section 44.13.1 of the General Requirements
(Reference FCO071).
ADDED COST THIS CHANGE ORDER ITEM: $28,084.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
e
Page 3 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine(9)
Date: July 19, 2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee& Ro
ITEM 5 - ADDITIONAL CONDUITS AT BASIN "L"
This item is for labor, material, and equipment needed to provide 80 feet of 1-1/2-inch conduit from
the Scott tunnel cable tray system to the Basin"L"controller. Pursuant to the original contract,the
existing conduits were to be re-used. Excessive corrosion discovered during construction did not
permit removal of the existing wiring as required pursuant to the contract documents. As a result of
this unknown condition,the Contractor was required to provide the additional conduit in order to
complete the installation. The work associated with this change order item was negotiated with the
Contractor in accordance with Division 1, Section 44.13.1 of the General Requirements (Reference
FCO076).
ADDED COST THIS CHANGE ORDER ITEM: $5,418.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 6 - SIGNAL CONDITIONER ADDITION
This item is to provide a signal conditioner at the 23BFCP002 panel that converts the expander speed
indication from 0-1 milliamp to 04-20 milliamp.The PLC input is configured for a 04-20 milliamp
signal. The requirement to supply a signal conditioner was omitted from the contract documents. It
was needed in order to provide an operable system and provide process information to Sanitation
District Operation's staff. The Contractor was required to purchase the signal conditioner, and the
operator(Air Products)of the Oxygen Plant was required to install the signal conditioner to comply
with their Maintenance Agreement with the Sanitation District.The work associated with this change
order item was negotiated with the Contractor in accordance with Division 1, Section 43.B.1 of the
General Requirements(Reference FC0078).
ADDED COST THIS CHANGE ORDER ITEM: $3,178.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 4 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine 9
Date: July 19 2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee& Ro
ITEM 7 - ADDITIONAL ENCLOSURES AT RASIWAS
This Rem is for labor, material, and equipment needed to provide ten enclosures required to comply
with the Underwriters Laboratory listing requirements for the isolators at the RAS/WAS VFDs. The
contract documents do not have a provision for the Contractor to enclose the Isolators. The isolators
are used to provide VFD data to Sanitation District Operation's staff. This requirement was necessary
in order to maintain the U/L listing and protect the new VFDs installed under this contract. This
additional work was required in order to correct the omission. The work associated with this change
order item was negotiated with the Contractor in accordance with Division 1, Section 43.B.1 of the
General Requirements(Reference FCO081).
ADDED COST THIS CHANGE ORDER ITEM: $4.032.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 8 - ADDITIONAL WIRE TAG NUMBERS AND DOCUMENTATION
This Rem is for labor, material, and equipment needed to provide documentation, wire labels and tag
numbers for several contract specified electrical panels located within the project area in the Plant.
The tagging and documentation is part of the Sanitation District's standards. Consistent
documentation results in familiarity with wiring and equipment,which potentially reduces accidents
due to working in unfamiliar conditions. The following panels required additional tagging and
documentation that was not included in the contract documents:
• Main Air Compressor Panels
• Panels OGA& OGB
• Motor Control Centers RAS E-1 & E-2
• Flow Meter Panels
• West RAS Remote 1/0 Panels
• East Gate Operating Panel
The work associated with this change order Rem was negotiated with the Contractor in accordance
with Division 1, Section 43.B.1 of the General Requirements (Reference FCO 093,094, 095, 096,
097, and 098).
ADDED COST THIS CHANGE ORDER ITEM: $17,200.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 5 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine 9
Date: July 19, 2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee& Ro
ITEM 9 - REPLACE CORRODED VENT FAN CONTROLLER
This item is for labor, material, and equipment needed to replace the corroded existing fan controller
in the east RAS basement. During the construction phase of this project, it was discovered that the
east RAS basement vent fan controller was severely corroded and nonoperational. Replacement of
the vent fan controller was necessary in order to supply sufficient ventilation in the east RAS
basement in order to maintain adequate atmospheric conditions for human occupancy. This condition
was not known during the design phase. This additional work was required in order to correct the
omission. The work associated with this change order item was negotiated with the Contractor in
accordance with Division 1, Section 43.8.1 of the General Requirements(Reference FCO099).
ADDED COST THIS CHANGE ORDER ITEM: $3,020.00
TIME EXTENSION THIS CHANGE ORDER REM: 0 Calendar Days
ITEM 10 - ISOLATE 12KV MONITORING CIRCUITS
This Rem is for labor, material, and equipment needed to isolate the 12Kv switchgear power
monitoring circuits. The 12Kv switchgear is being replaced as part of Job No. J-33-1A. The J-33-1A
switchgear incorporates it's own power monitoring which was not known during the design of this
project. Therefore, the power monitoring circuits were required to be secured and isolated in lieu of
being terminated as specified. The work associated with this change order Rem was negotiated with
the Contractor in accordance with Division 1, Section 43.B.1 of the General Requirements(Reference
FC0101).
ADDED COST THIS CHANGE ORDER ITEM: $363.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 6 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine 9
Date: July 19, 2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P247-3
Consultant: Lee& Ro
ITEM 11 - ADDITIONAL PROGRAMMABLE LOGIC CONTROLLER INPUTS
This item is for labor, material, and equipment needed to furnish and install two PLC inputs for each
Uninterruptible Power Supply (UPS) unit in order to interface with the Remote I/O Panel and the
OASES PLC. The present configuration does not provide operating personnel with an alarm when
the UPS battery is on or in a fault condition. The Contractor was required to perform the additional
work in order to correct the omission and the potential unsafe condition. The work associated with
this change order item was negotiated with the Contractor in accordance with Division 1, Section
43.6.1 of the General Requirements (Reference FCO104).
ADDED COST THIS CHANGE ORDER ITEM: $11,783.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 12 - CABLE TRAY/BUS GROUNDING ADDITION
This Item is for labor, material, and equipment needed to furnish and install a#410 grounding
electrode from the cable tray ground cable to the bus station ground. All cable tray systems are
required to be grounded pursuant to the National Electrical Code. This provision was omitted from the
contract documents. The work associated with this change order item was accomplished by the
Contractor's force account in accordance with Division 1, Section 44.8.1 of the General Requirements
(Reference FCO105).
ADDED COST THIS CHANGE ORDER ITEM: $2,877.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 7 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 9272MI27
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine 9
Date: July 19 2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P247-3
Consultant: Lee& Ro
ITEM 13—TIME EXTENSION
This Rem is to extend the contract duration in order to accommodate numerous non-contract related
problems encountered that impacted the start-up of the west side Aeration Basins and the critical path
to final completion:
1. Failed Sanitation District owned RAS VFDs
2. Non-operable Sanitation District owned process control equipment
3. Debris discovered in the Secondary Clarifier" K" Sludge Withdraw Valve
4. Revised tag numbers and drawings
As a result of the aforementioned problems,the Contractor has requested a time extension. The
Time Impact Analysis (TIA) No. 6 was reviewed and approved by staff. Based on the TIA, staff
recommends approval of a 100 calendar day time extension, which will extend the contract
completion date from February 20,2006 to May 31, 2006. The work associated with this change
order item was negotiated with the Contractor in accordance with Division 1, Section 43.B.1 of the
General Requirements(Reference FCO No. 124).
ADDED COST THIS CHANGE ORDER ITEM: $0.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 100 Calendar Days
ITEM 14 - RETENTION REDUCTION
This project is 99% complete and all work to date has been completed in accordance with the contract
requirements. The Contractor has requested a reduction in retained funds from ten percent to five
percent. Staff recommends that the Contractor's request to reduce the retention from ten percent to
five percent be accepted. Reference Morrow-Meadows Corporation's letter, dated February 2, 2006.
ADDED COST THIS CHANGE ORDER ITEM: $0.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL ADDED COSTS THIS CHANGE ORDER: $82,199.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 100 Calendar Days
z
Page 8 of 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine 9
Date: July 19,2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee& Ro
The additional work contained within this change order was performed incidental to the prime work
and within the time allotted for the original contract and any extensions to the contract time made by
this and all previously issued change orders. It is therefore mutually agreed that a 100 day extension
of time to perform the work is required for this change order. The Sanitation District and Contractor
agreed that the added costs described above constitutes full and equitable consideration for all the
impacts occurred by the Contractor, and no other direct or indirect, incidental or consequential costs,
expenses, losses, or damages have been or will be incurred by Contractor, except as expressly
granted and approved by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Date: November 6, 2003
Original Contract Time: 485 Calendar Days
Original Completion Date: March 4, 2005
Time Extension this C.O.: 100 Calendar Days
Total Contract Time Extension: 452 Calendar Days
Revised Contract Time: 937 Calendar Days
Revised Final Completion Due Date: May 31, 2006
Projected Completion Due Date: July 31, 2006
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: NIA
Original Contract Price $4,712,000
Prev.Authorized Changes $2,550.408
This Change (Add) (Bed', $ 82.199
Amended Contract Price $7,344.607
Page 9 of 9
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: Nine 9
Date: July 19.2006
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee& Ro
Board Authorization Date: July 19, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Tod Haynes, P.E. Date
Engineering and Construction Division Manager
Approved by:
David A. Ludwin P.E. Date
Director of Engineering
Accepted by:
MORROW-MEADOWS CORPORATION
Contractor Date
EOMSOM01COn
PDC COMMITTEE Meeting Date To 9a.of Mr.
07/06/06 07/19/06
AGENDA REPORT Item Number Item Number
PDC0664 13(c)
Orange County Sanitation District
Collections
Facilities
FROM: David Ludwin, Director of Engineering
Originator: Hardat Khublall, CIP Project Manager
SUBJECT: SANTA ANA RIVER INTERCEPTOR, 2005 EMERGENCY REPAIRS
FROM 10,000 CFS RELEASE, CONTRACT NO. 2-41-4B
GENERAL MANAGER'S RECOMMENDATION
(1) Ratify Change Order No. 3 to Santa Ana River Interceptor, 2005 Emergency Repairs
from 10,000 CFS Release, Contract No. 2-414B, with Ken Thompson, Inc., authorizing
an addition of$15,700 and 50 calendar days, increasing the total contract amount to
$1,446,273, and (2)Accept Santa Ana River Interceptor, 2005 Emergency Repairs from
10,000 CFS Release, Contract No. 241.4B, as complete, authorizing execution of the
Notice of Completion and approving the Final Close Out Agreement.
SUMMARY
• Significant erosion of the Santa Ana River Interceptor (SARI) pipeline soil cover
within the Santa Ana River occurred as a result of the January 2005 heavy rains and
the record high flood release from the Army Corps of Engineers Prado Dam. This
reduced cover over the pipeline necessitated emergency repairs to prevent a
washout from occurring.
• The Orange County Sanitation District (Sanitation District) staff prepared the plans
and specifications on September 2005, and the construction contract was awarded
to Ken Thompson, Inc. on October 31, 2005.
• Change Order No. 3 includes two items of additional work for Contract No. 2-41-4B.
There are no nonreimbursable design errors and no reimbursable design errors
associated with this change order. Liquidated damages on this project are $2,500
per day and there are no bonus provisions. This contract is now 100% complete.
Santa Ana Watershed Project Authority (SAWPA) will be responsible to reimburse
the Sanitation District 76% ($11,932) of the change order costs.
Page 1
r
PRIOR COMMITTEE/BOARD ACTIONS
On July 7, 2005, the Board of Directors approved a budget increase of$1,800,000 for a
total budget of$2,800,000; and authorized the General Manager to solicit bids and
award a construction contract for the construction of the Santa Ana River Interceptor
2005 - Phase 2 Emergency Repairs for an amount not to exceed $1,500,000. The
construction contract was awarded by the General Manager on October 31, 2005.
Please refer to the attached Change Order Status Report for more information on
previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price: $ 1,349,065
Previously Authorized Change Orders: $ 81,508
This Change Order No. 3: $ 15,700
Change Orders to Date: $ 97,208
Percent Increase to Date: 7.21%
Amended Contract Price: $ 1,446,273
BUDGETIMPACT
® This item has been budgeted. (Line Item: FY 06/07 Budget Book, Page 48
[Pending approval by the Board on June 28, 2006])
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
Adjustments to Phases 1, 2, and 3 of the Budget Information Table are also required to
account for Sanitation District's staff charges.
The District has been approved to receive up to $1,612,000 in grant reimbursement for
the emergency repairs from the Natural Resource Conservation Service (NRCS). This
will be reflected on the BIT when the money is received.
ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date: October 31, 2005
Original Contract Completion Date: February 17, 2006
Total Number of Change Orders to Date: 3
Current Contract Completion Date: April 14, 2006
Actual Completion Date: April 14, 2006
Days Subject to Liquidated Damages: 0
Page 2
Chance Order No. 3 Content
Item No. Description Amount Days Type
Contract
No. 2d1-4B
Preparation of Habitat Mitigation
1 and Monitoring Plan $12,000 50 Other
2 Reimbursement of City Permit Fees $3 700 0 Other
Total—Change Order No. 3 1 16,700 So
Item 1 —This Rem is for extra work required by the permitting agencies to develop a
Habitat Mitigation and Monitoring Plan (HMMP). The scope of work in the contract
documents did not include all of the regulatory requirements of the permitting agencies,
and therefore impacted the report preparation time incurred by the subcontractor's
biologists.
Item 2—This Rem is for the reimbursement of city permit fees to the contractor. The city
required the contractor to make major improvements to a driveway approach off of
La Palma Avenue, including asphalt overlay, new curb and gutter, bike trail resurfacing,
and irrigation system enhancements. This additional work was beyond the contractor's
Scope of Work. Therefore, it was decided to defer the city requested improvements to
be done under a separate contract at a later date.
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
A Notice of Exemption was filed with the County of Orange on August 16, 2005.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order No. 3
HK:bma:kf
K ntglobarAgenda Draft RewrIMPDCV414B Agenda Repod.dw
Page 3
BUDGET INFORMATION TABLE
Santa Ana River Interceptor 2006 Emergency Repairs from 10,000 CFS Release
Contract No. 2-41-4 B
ORIGINAL CURRENT PROPOSED .PROPOSED: FUNDS _ THIS . PROPOSED ESTIMATED ESTIMATED
f PROJECTMHASE AUTHORIZED PROJECT BUDGET REVISED AUTNORODEDTO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
/-BUDOET BOOOET INCREASE. BUDGET' DATE REQUEST AUTHORIZATION TO DATE DATE(%)
IOECREASE.'
Phew 1-Projecl De. menl $ - S 20,000 S .027 5 17.973 $ 20.000 S 2,02 S 17,973 S 17.973 100%
Phew 2-P,e11m1w Dasi n S - $ 50,000 $ 8249 $ 5B.249 S 50,000 S 8249 $ 58.249 5 $8,249 ion
Phase 3-Deal n $ - $ 170,000 5 1p40 S 171.440 $ 170.000 $ 1,44D 5 171,440 I 5 171."0 100%
Phase 4-Consnuslbn S 1,000.000 S 3.300.000 $ 3.300.000 $ 2.780.036 $ 15700 $ 2795.738 5 2.795,736 100%
Phew 5-Commbsbnirig S - $ 10,000 $ 10000 S 10.000 $ 10,000 S 3.979 40%
Phaw 6-CWs Oul S $ 0%
Phew 7-Confincenw $ - $ 50.000 S 7662 $ 42338 S 0%
PROJECTTOTAL $ 1,000.000 S 3.600.000 S - S 3.600,000 $ 3,030.036 5 23.362 5 3453.398 S 3.047.377 100%
ReimDwweh Cmie $ 760.000 S 2,736,000 S 2,736,000 11$ 2,302,827 S 17.755 1 S 2.320,582 1 S 2,320.582
PROJECT NET $ 24D.000 S 864.000 1 S - S 864,000 I 1 5 727,209 1 $ 6.607 $ 732.816 1 S 726.795 1 99%
PSAICuntraet
Dealon PSA S 5 - S J I S - S 0.0%
5vuc nC"Iml S 1.500.000 1$ 1.430.573 1$ 15,700 $ 1."5.273 S 1.430.673 1 5 15.700 1 $ 1,448.273 3 1,341,058 1 93%
6DwomIem2
CHANGE ORDER STATUS REPORT
SANTA ANA RIVER INTERCEPTOR 2005 EMERGENCY REPAIRS FROM 10,000 CFS RELEASE
CONTRACT NO. 2-41-4B
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(DAYS) (DAYS)
CONTRACT 10/312005 $1,349,076 $1,349,076 0.00 110 110
CO NO. 1 4262006 $91,221 $1,440,297 6.76% 6 116
CO NO, 2 4/262006 ($9,713) $1,430,573 6.04% 0 116
CO NO. 3 1 Pending r $15,700 $1,446,273 7,21% 50 166
EDMS:003810469
CHANGE ORDER PERFORMANCE REPORT
SANTA ANA RIVER INTERCEPTOR,2005 EMERGENCY REPAIRS FROM 10,000 CPS RELEASE,
CONTRACT NO.241-4113,CHANGE ORDER NO.3
Connector:KEN THOMPSON,INC. Project Type:COLLECTIONS
Design Consullem:OCSD STAFF Contrail%Complete:100% S1.349,055
CHANGE ORDER TYPES TRACKED INFORMATION ONLY
Relmbumabte Design NonAteinlaursabla Design Subtotal CO Types
Unanown Condition Slag Requested Change Errors Errors Tracked' Other Tulal
Change Orden $12.0 0.89% so 0.00% SO 0.00% $0 0.00% $12,000 0.89% $3,700 027% $15.700 1.16%
this Pedod
Change Orden to $7,827 0.58% $21.186 1.57% So 0.00% $0 0.00% $29,013 2.15% $52,495 3.89% $81,508 5.04%
Change Order Total f19,B27 1.47% $21.186 1.67% $0 0.00% $0 0.00% $41.013 3.04% $56.195 4.17% $97,208 7.21%
Program <3.00% <1.00% 0.00% <1.00% <5.00% 0.00% <5.00%
%tormance Goala
'TM Charge OMer Management Plan the ks the Preceding tour Wnge Order types
EOMS:003810463
Page 1 of 3
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Ken Thompson, Inc. C.O. No.: Three(3)
Date: July 19,2006
Job: Santa Ana River Interceptor 2005 Emergency Repairs from 10,000 CFS Release.
Contract No. 2-41-B
Consultant: OCSD Staff(Enaineerina)
Amount of this Change Order(Add) $15,700.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 - PREPARATION OF HABITAT MITIGATION AND MONITORING PLAN
The additional work required by the permitting agencies to develop a Habitat Mitigation and
Monitoring Plan (HMMP)was not known during the preparation of the contract documents. The
permit and the specifications defined only the general conditions and requirements, but did not cover
the detail components of the HMMP Report. The extra work consisted of ongoing work done by the
contractor's project biologists, well after the physical completion of the project, to complete all issues
related to compliance with the regulatory agencies, and providing input to the HMMP Report.
Contractor is provided a non-compensable time extension of 50 days (Reference FCO No.005).
ADDED COST THIS CHANGE ORDER ITEM: $ 12,000.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 50 Calendar Days
ITEM 2-REIMBURSEMENT OF CITY PERMIT FEES
This item is to compensate the contractor for a deposit that was paid to the City of Yorba Linda, as a
requirement to obtain a city permit,for access to the worksite, and to use city streets as a haul route
under this contract. As a condition for return of the deposit money($3,700),the city requested that
the contractor perform additional work on the driveway approach that was beyond the contractor's
scope of work. Staff agreed not to undertake any additional street improvements at this time, as
requested by the city, and will defer it to a separate contract. This deposit amount will be reimbursed
to the Sanitation District once the work is completed at a later date(Reference FCO No. 006).
ADDED COST THIS CHANGE ORDER ITEM: $ 3,700.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL ADDED COSTS THIS CHANGE ORDER: $ 15,700.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 50 Calendar Days
Page 2 of 3
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Ken Thompson, Inc. C.O. No.: Three
Date: July 19, 2006
Job: Santa Ana River Interceptor 2D05 Emergency Repairs from 10,000 CFS Release.
Contract No. 2414B
Consultant: OCSD Staff(Engineering)
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by this
and all previously issued Change Orders. It is therefore mutually agreed that a fifty day time extension is
required for this Change Order, and no other direct or indirect, incidental or consequential costs,
expenses, losses or damages have been or will be incurred by Contractor,except as expressly granted
and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: October 31,2005
Original Contract Time: 110 Calendar Days
Original Completion Date: February 17, 2006
Time Extension this C.O.: 50 Calendar Days
Total Contract Time Extension: 56 Calendar Days
Revised Contract Time: 166 Calendar Days
Revised Final Completion Due Date: April 14, 2005
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: April 14, 2006
Original Contract Price $ 1,349,065.00
Prev.Authorized Changes $ 81,508.00
This Change(Add) $ 15,700.00
Amended Contract Price $ 1,446,273.00
Page 3 of 3
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Ken Thompson, Inc. C.O. No.: Three 3
Date: July 19, 2006
Job: Santa Ana River Interceptor 2005 Emergency Repairs from 10,000 CFS Release,
Contract No. 2-41-413
Consultant: OCSD Staff(Engineering)
Board Authorization Date: April 26, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Hardat Khublall, P.E. Date
OF Project Manager
Approved by:
David A. Ludwin P.E. Date
Director of Engineering
Accepted by:
Ken Thompson, Inc.
Contractor Date
EDMS: OWBI 73
PDC COMMITTEE Me In roea.oroo-.
07/06/06 O71i9/O6
"i AGENDA REPORT Item Number Item Number
* PD[06-6s 13fE1
Orange County Sanitation District
Collections
r•cil
FROM: David A. Ludwin, Director of Engineering
Originator: Hardat Khublall, CIP Project Manager
SUBJECT: GISLER-REDHILL TRUNK IMPROVEMENTS, REACH "A", CONTRACT
NO. 7-36; ORANGE TRUNK IMPROVEMENTS, CONTRACT NO. 7-39;
GISLER-REDHILL/NORTH TRUNK IMPROVEMENTS, CONTRACT
NO. 7-41; AND CITY OF TUSTIN PROJECT NOS. 6106 AND 6151
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 9 to Gisler-Redhill Trunk Improvements, Reach "A", Contract
No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk
Improvements, Contract No. 7-41; and City of Tustin Project Nos. 6106 and 6151, with
ARB, Inc., authorizing an addition of$643,271, increasing the total contract amount to
$21,534,951.
SUMMARY
• Contract No. 7-41 located in the City of Tustin, City of Orange, and unincorporated
areas of the County of Orange, consists of improvements to relieve hydraulic
deficiencies on the Gisler-Redhill North Trunk Sewer along Newport Avenue,
El Camino Real, and Prospect Avenue. Contract No. 7-39 is located in the City of
Tustin and in the unincorporated areas of the County of Orange, and consists of
improvements to relieve hydraulic deficiencies on the Orange Trunk Sewer along
Holt Avenue, 17" Street, and Hewes Avenue. Contract No. 7-36, located in the City
of Tustin, consists of improvements to relieve hydraulic deficiencies on the
Gisler-Redhill Trunk Sewer Improvements along Redhill Avenue from Mitchell
Avenue to La Colina Drive. The 1999 Strategic Plan identified these reaches of
sewers as hydraulically deficient and in need of replacement.
• AKM Consulting Engineers prepared the plans and specifications and the
construction contract was awarded to ARB, Inc. on January 28, 2004.
• Change Order No. 9 includes seven items of added work to Contract No. 7-41 and
Contract No. 7-36. There are three nonreimbursable design errors and one
reimbursable design error associated with this change order. The contract includes
liquidated damages of$1,000 per day and no bonus provisions. The contract is now
100% complete.
Page 1
PRIOR COMMITTEEIBOARD ACTIONS
The construction contract was awarded by the Board on January 28, 2004 for a lump �i
sum amount of$18,375,999. Please see attached Change Order Status Report for
information on all previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 18,375,999
Previously Authorized Change Order $ 2,515,681
This Change Order (Add) $ 643,271
Change Orders to Date $ 3,158,952
Percent Increase to Date 17.19%
Amended Contract Price $ 21,534,951
BUDGETIMPACT
® This Rem has been budgeted. (Line item: Contract No. 7-36 FY 06107, Contract No. 7-41
FY 06/07, Capital Improvement Program, Collections Facilities, Facilities Engineering Projects-
Collections)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date April 5, 2004
Original Contract Completion Date November 25, 2005
Total Number of Change Orders to Date 9
Current Contract Completion Date March 31, 2006
Days Subject to Liquidated Damages TBD
Liquidated Damages Assessment TBD
Page 2
a
Chance Order No. 9 Content
v
Item No. Description Amount Days Type
Contract
No. 7-41
1 18-inch Storm Drain, Sta. $48,678 0 Unknown
161+80. Conditions
20-inch East Orange County Reimbursable
2 Water District Water Line, Sta. $387,439 0 Design Error
161+75.
Contract
7-39
3 Modification of 8-Inch Sewer $69 682 0 Unknown
Lateral C-1, Sta. 36+58. Conditions
Modification of 4-inch House
4 Connections to 8-inch Sewer $91,862 0 Nomeimbursable
Laterals, Sta. 16+68 and Design Error
17+88.
5 72-Inch Drop Manhole, Sta. $8,245 0 Nonreimbursable
32+16. Design Error
6 6-inch Waterline Removal, $2468 0 Unknown
Sta. 26+80. Conditions
18-Inch Sewer Pipe Nonreimbursable
7 Replacement, Sta. 26+96. $34,897 0 Design Error
Total—Chan a Order No. 9 $643,271 0
Item 1 —This item is for additional costs to remove and replace approximately 20-feet of
an existing 18-inch storm drain at sewer station 161+80. During construction, it was
found that the top of the stone drain interfered with the proposed sewer pipe. The storm
drain was shown in contract drawings as being located below the proposed 21-inch
sewer pipe.
Item 2—This item is to compensate the Contractor for additional costs due to an
undisclosed 20-inch asbestos cement water line owned by the East Orange County
Water District found at the Fairhaven Ave and South Prospect Ave intersection. The
20-inch water line was not shown in contract drawings and interfered with the proposed
sewer elevation. The proposed sewer elevation was modified and as a result of this
modification, an existing 60-inch storm drain located beneath the proposed sewer had
to be modified and approximately 300-feet of the proposed sewer had to be removed
and replaced. Staff is seeking reimbursement from AKM Consulting Engineers for a
portion of this item that involved rework.
Page 3
Item 3—This Rem is for additional costs to modify the proposed 8-sewer lateral
alignment at approximate sewer station 36+58, at San Juan Ave and Red Hill Ave
intersection. An existing 36-inch storm was incorrectly shown in contract drawings and
interfered with the proposed sewer lateral. The proposed sewer lateral alignment was
modified to resolve the conflict with the stone drain.
Item 4 —This Rem is for the extra cost associated with the connection of two 8-inch
sewer laterals at approximate sewer stations 16+68 and 17+88. The 8-inch sewer
laterals were incorrectly shown in contract drawings as 4-inch house connections, and
required to be connected to the proposed 27-inch sewer. The additional work consisted
of construction of two 72-inch drop-in manholes, connection of the service laterals,
additional shoring and excavation. Manholes are not required by Sanitation District
standards for house connections, but are required for the connection of sewers, 8-inch
and above in size.
Item 5—This Rem compensates the Contractor for the relocation of a 72-inch sewer
manhole from sewer station 31+80 to 32+16, and modification of a standard manhole to
a drop manhole. Contract drawings show an existing 4-inch house connection to be
located at sewer station 32+16. During construction R was found that the 4-inch house
connection was indeed of an 8-inch sewer lateral and due to its elevation a drop
manhole was needed.
Item 6—This Rem is for the extra cost to remove an abandoned 6-inch PVC water line
located at approximate sewer station 26+80, at El Camino Ave and Red Hill Ave
intersection, and for four hours of standby. During construction a 6-inch PVC pipe was
found 1.5-feet above the proposed sewer, and conflicted with the sewer trench. The
City of Tustin Water Department found that the water line was abandoned. The water
line was not shown in contract drawings.
Item 7 —This Rem is to compensate the Contractor for the additional costs to remove
and replace approximately seven feet of 18-inch pipe with 24-inch pipe, at approximate
sewer station 26+96. During construction it was found that the connection sewer pipe
between two adjacent manholes was 18-inch in size and not 244nch as shown in
contract drawings. The size of the new sewer pipe installed north of the upstream
manhole was 27-inch and the size of the existing sewer pipe south of the downstream
manhole was 24-inch. The additional work consisted of core drilling at each manhole,
additional excavation, removal and replacement of approximately seven feet of 18-inch
sewer pipe with 24-inch pipe. This additional work was not part of the original contract.
ALTERNATIVES
None
CEGA FINDINGS
This project was included in the 1999 Strategic Plan Program Environmental
Impact Report certified on October 27, 1999. A Notice of Determination was filed on
October 29, 1999.
Page 4
ATTACHMENTS
1. Budget Information Table — Contract No. 7-36
2. Budget Information Table — Contract No. 7-41
3. Change Order Status Report
4. Change Order Performance Report
5. Change Order
6. Location and Photo Description of Change Order No. 9
RC:eh:kf
H:l IglabaMgenda Draft ReXgsS DCV-W AR CO 119 7-19-0 dm
Page 5
f I
BUDGET INFORMATION TABLE
GISLER-REDHILL TRUNK IMPROVEMENTS, REACH"A"
CONTRACT NO. 7-36, CO#9
PROPOSED
AUTHORIZED
CURRENT - . PROPOSED FUNDS THIS PROPOSED ESTIMATED R ESTIMATED
BUDGET PROJECTIPHASE AUTHDGET PROJECT BUNGED : AUTHORIZED 70 AUTHORIZATION TOTAL EXPENDITURE DATE EXPENDED TO
BUDGET BUDGET 4NCREASE. BUDGET :DATE REQUEST AUTHORIZATION TO DATE OATEI%):-:
IdECREASE
Phase I-Pro ct Development $ 45,000 $ 29,810 $ 29.810 S 29,810 3 29.810 $ 29,810 100%
Phase 2-Prelimina Design $ 1,504 S 1,504 5 1,504 S 1.504 $ 1,504 100%
Phase 3-Design $ 369.000 $ 581 A79 S 581.679 $ 581.679 $ 581,672 S 581.6791 100%
Phase 4-Conseuction $ 6,386.000 S 5,979.602 IS 207.154 S 5,186,756 $ 5.979,602 S 207,154 S 6,186756 $ 5,027,333 81%
Phase 5-Commissioning 3 94,272 $ 94.272 S 94,272 S 94,272 $ 14.449 15%
Phase 6-Close-Out $ 23.050 S 21050 $ 23.050 6 23.050 $ 442 2%
Phase 7-Contin en $ 1,032.000 $ 347,516 8 207,154 $ 140,362
PROJECTTOTAL S 7,832,000 $ 7,057,433 S - $ 7,067,433 S 6.709,917 S 207,154 S 6,917,071 $ 5.655.217 82%
Reimbursable Costs
PROJECT NET I $ 7,832.000 $ 7,057,433 $ - S 7,057,433 11 S 6709,917 $ 207,154 S 6.917,071 1 $ 5.655,217 82%
PSA/Contract
Oes' n PSA $ 223.176 $ 331.522 S 331,522 11 S 331.522 S 331.522 1 $ 320.485 97%
Constmclion Contract is 6.386,000 1$ 5.2U 488 1 S 207,154 $ 5.491.642 $ 6.284.488 $ 207,154 1 $ 5,491,642 S 4,692.057 85%
EDMS:003811332
BUDGET INFORMATION TABLE
ORANGE TRUNK IMPROVEMENTS
CONTRACT NO. 7-39, CO#9
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJELTIPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE --/OECREIISE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
_
Phasel-P Development $ 46.000 S 46,564 S 46,564 S 46,564 5 46,564 $ 46.564 100%
Phase 2-Prelnnhs n S 1.000 S 1.391 $ 1301 $ 7391 $ 1391 $ 1 91 100%
Phase 3-Desim S 395000 5 411.471 S 411.471 S 411.471 S 411A71 S 411.471 100%
Phase 4-Censbuclion S 4250.000 $ 4,764,634 S /784,634 S 0784634 $ 4.769634 S 4.764276 7DD%
Phase 6-CommissioniN S 61000 S 61735 S 51,735 1 $ 67735 $ 61,735 S 37735 61%
Phase 6-Clesa-0ut $ 17000 $ 12.134 $ 12,134 S 12.134 $ 12.134 $ 31505 29%
Phase 7-ConS nW S 527000 $ S - 8
PROJECT TOTAL S 5,298.000 3 5,297.929 S - $ 5.297.929 $ 5.297.929 S - $ 5.297.929 $ 5.2 .941 99%
Reimbursable Cosis
PROJECT NET 1 $ 5,298,000 $ 5.297,929 $ - f 5.297,929 C' $ 5,297,929 1 S - S 5,297.929 $ 5.264.941 99%
PSAIContnel
IDesip PEA is 224.098 5 235,238 3 235,238 -. S 235,238 $ 2352M $ 235.238 100%
Consbuu6on Cenbwt is 4113,733 1 S 4,292,354 1 S 4,292,354 11 S 4,292,354 1 1 S 4,292.354 1 S 4,282,098 100%
EDMS:003812152
e. -
BUDGET INFORMATION TABLE
GISLER-REDHILLMORTH TRUNK IMPROVEMENTS
CONTRACT NO. 7-41, CO#9
-ORIGINAL CURRENT PROPOSED -PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED UDGET PROJECTPROJECT %REMBED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
INCREASE
- BUDGET , "BUDGET � �:BUDGET DATE REDDEST AUTHORIZATION TO DAM DATE(X)
(DECREASE ,.
Phase 1-Project Development $ 40.000 S 41,000 S 41.000 $ 41,000 $ 41.000 S 39,7W 97%
Phase 2-Pref iw Design $ 1,000 $ WOW $ 18.000 $ III= S 18.000 $ 15,429 86%
Plisse 3-Oea n S 628,000 S 680,000 S 680,000 S 680,W0 $ 680,000 S 644,071 95%
Phese4-Conslmdicn $ 11128.000 $ 16,050,450 $ 16.050450 S 1SA14,333 $ 438.117 $ 16,050.450 $ 13,420,612 84%
Phase 5-Co..issloNhg S 183,000 S 216,000 $ 216,000 $ 216,000 S 216,000 $ 21,283 10%
Phase6-Close-Oul $ 45.000 S 45,000 $ 46.000 $ 46.W0 $ 46,000 S 3,305 7%
Phase 7-Contln en S 1,334.000 S 440,550 $ 440.550 $
PROJECTTOTAL S 15,359.000 S 17492,000 S - $ 177492.000 $ 16.615,333 $ 436,117 S 17.051,450 S 14,144436 83%
Reimbursable Costs $ 683.563 1 $ 683,563 S 683,563 1 $ 683.563
PROJECT NET $ 15,359,000 S 16,808437 $ - $ 16,808,437 11 S 15,931,770 $ 436.117 $ 16,367,887 $ 14.144,436 86%
PSA/Contract
iDesian PEA $ 368,684 $ 420,641 $ 420.641 11 S 420.641 $ 420.641 $ 415,530 99%
Construction Contmcl is 9,350.612 $ 12.510,370 $ 436,11] $ 1&946,487 $ 12.510.370 $ 436,117 $ 12,946.487 $ 11,101,068 86%
EDMS:003811333
CHANGE ORDER STATUS REPORT
GISLER-REDHILL TRUNK SEWER IMPROVEMENTS, ORANGE TRUNK SEWER IMPROVEMENTS, AND
GISLER-REDHILL NORTH TRUNK SEWER
CONTRACT NOS. 736, 7-39, AND 7-41
AND CITY OF TUSTIN PROJECT NUMBERS 6106 AND 6151 -CO#9
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(DAYS( (DAYS(
CONTRACT 1/28/2004 $18,375,999 $18,375,999 0.00% 600 600
CO NO, 1 11/24/2004 $349,612 $18.725,611 1.90% 20 620
CO NO.2 223/2005 $169,223 $18.894,834 2.82% 15 635
CO NO. 3 4272005 $571,975 $19,466,809 5.94% 20 655
CO NOA 720/2005 $493,263 $19,960,072 8.62% 9 664
CO NO.5 928/2005 $209,252 $20,169,324 9.76% 21 685
CO NO.6 222/2006 $55,000 $20,224,324 10.06% 5 690
CO NO.7 4/26/2006 $169,962 $20,394,286 10.98% 27 717
CO NO.8 6282006 $497,394 $20,891,680 13.69% 9 726
CO NO.9 I Pending $643,271 $21,534,951 17.19% 0 726
EDMS:0038113M
C
CHANGE ORDER PERFORMANCE REPORT
GISLER-REDHILL TRUNK SEWER IMPROVEMENTS,ORANGE TRUNK SEWER
AND GISLER-REDHILL NORTH TRUNK SEWER,CONTRACT N0S.7C6,T49,AND 741
AND CITY OF TUSTIN PROJECT NUMBERS 6100 AND 6161
CHANGE ORDER NO.S
ConPaclor.ARE,INC PMIW TYP6:COLLECTIONS
De"n ConwMnl'.AKM CONSULTING ENGINEERS COMml%C.P%%'.100 Oaglnel COMred PXro: 316,375.9111
CHANGE ORDER TYPES TRACKED INFORMATION ONLY
RMmfiurx6b Design NOnAMn6araP6IP 61tlwaMICO TYPx
Unknown CanO0es Staff Hu9ueedd Cllxgo Male DePlgn E.. T.W. Own Tay1
n rde O Change od $IM,82 0.65% iD ON% ' $387,030 2.11% H68,006 0.7 0668,271 3. 9.00% S8a5,271 3.50%
MIP a rde
Change ONma to $1313,45 7.16% $197,071 1.07 M 0.00% 3396,947 2.15% 81,0116,416 10.3 $610.196 3.32% $2,515,881 13,6
Dn n
CMng9 Onler Total S143a,298 T.81X S197,071 1.07% $387439 2.11% 3529,951 2,8a% $2,546,757 13.8 6910,195 3.32% $3,158,952 17.19%
P.,.. <3.00% <1.00% 000% <1,00% <5.00% 0.00% <5.00%
Peaolmence Goela
Tke C7 ONn Max9emml Plan bed91M Pam N,Kur tlunx doer ryp0e
To be Negotiated
EOMUY 11335
Versan W112006
v Page 1 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB, INC. C.O. No.: Nine(
Date: July 19. 2006
Job: Gisler Redhill North Trunk Sewer. Reach"A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Protect Numbers 6106, and 6151
Consultant: AKM Consuttina Engineers
Amount of this Change Order(Add) $643,271.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation,the following additions to or deductions
from the contract price are hereby approved.
Contract No. 7-41
ITEM 1 — 18-INCH STORM DRAIN, STA. 161+80.
This Rem is for additional costs to remove and replace an existing 18-inch storm drain at sewer station
161+80. The storm drain is shown in contract drawings to be located 2-feet 2-inches below the
proposed 21-inch sewer pipe. During construction, it was found that the top of the storm drain
interfered 10.5-inches with the proposed 21-inch sewer pipe. The additional work consisted of
removal and replacement of approximately 20-feet of 18-inch storm drain, additional excavation and
slurry backfill. This item was accomplished by Contractor's Force Account and was determined by
Sanitation District pursuant to Division 1, Section 44(B)2 of the General Requirements (Reference
FCO No. 59)
ADDED COST THIS CHANGE ORDER ITEM: $48,678.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per
OCSD; ARB reserving its rights as
noted herein.
ITEM 2-20-INCH FAST ORANGE COUNTY WATER DISTRICT WATER LINE, STA. 161+75.
This Rem is to compensate the Contractor for additional costs due to an undisclosed 20-inch asbestos
cement water line owned by the East Orange County Water District found at approximate sewer
station 161+75, at Fairhaven Ave and South Prospect Ave intersection. The 20-inch water line was
not shown in contract drawings and interfered with the proposed sewer elevation. The proposed
sewer elevation was modified and as a result of this modification an existing 60-inch storm drain
located beneath the proposed sewer had to be modified. The additional work consisted of applicable
equipment standby, additional exploratory excavations for water line survey, modification of an
existing 60-inch stone drain by construction of a concrete storm drain squash box, reinstallation of
new sewer pipe due to the revised sewer elevation, slurry backfill, and additional paving. This item
was accomplished by Contractor's Force Account and was determined by Sanitation District pursuant
to Division 1, Section 44(B)2 of the General Requirements (Reference FCO No. 51)
ADDED COST THIS CHANGE ORDER ITEM: $387.439.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per OCSD;
a
Page 2 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARE, INC. C.O. No.: Nine(g)
Date: July 19, 20D6
Job: Gisler Redhill North Trunk Sewer Reach"A". Contract No. 7-36: Orange
Trunk Improvements Contract No.7-3R Gisler RedhilllNorth Trunk Sewer Improvements:
Contract No. 7-41& and City of Tustin Project Numbers 6106 and 6151
Consultant: AKM Consuttino Engineers
AIRS reserving its rights as noted
herein.
Contract No. 7-36
ITEM 3—MODIFICATION OF 8-INCH SEWER LATERAL C-1, STA. 36+58.
This gem is for additional costs to modify the proposed 8-inch sewer lateral alignment, Lateral "C-1",
located at approximate sewer station 36+58, at San Juan Ave and Red Hill Ave intersection. An
existing 36-inch storm was incorrectly shown in contract drawings and interfered with the proposed
sewer lateral. The proposed sewer lateral alignment was modified to resolve the conflict with the
storm drain. The additional work consisted of additional excavation, manhole relocation, re-
installation of sewer lateral, additional backfill, and additional asphalt removal and replacement. This
item was accomplished by Contractors Force Account and was determined by Sanitation District
pursuant to Division 1, Section 44(B)2 of the General Requirements (Reference FCO No. 70).
ADDED COST THIS CHANGE ORDER ITEM: $69,682.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per
OCSD; ARB reserving its rights as
rated herein.
ITEM 4—MODIFICATION OF 4-INCH HOUSE CONNECTIONS TO 8-INCH SEWER LATERALS,
STA. 16+68 AND 17+88.
This gem is for the extra cost associated with the connection of two 8-inch sewer laterals at
approximate sewer stations 16+68 and 17+88. The 8-inch sewer laterals where incorrectly shown in
contract drawings as 4-inch house connections, and required to be connected to the proposed 27-
inch sewer. The additional work consisted of construction of two additional 72-inch drop-in manholes,
connection of the service laterals, additional shoring, excavation and backfill. This item was
accomplished by Contractor's Force Account and was determined by Sanitation District pursuant to
Division 1, Section 44(B)2 of the General Requirements (Reference FCO N0. 62)
ADDED COST THIS CHANGE ORDER ITEM: $91,862.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per
OCSD; ARB reserving its rights as
noted herein.
Page 3 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB, INC. C.O. No.: Nina(9)
Date: July 19, 2006
Job: Gisler Redhill North Trunk Sewer. Reach"A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7.39:Gisler RedhilllNorth Trunk Sewer Improvements;
Contract No. 7-41: and City of Tustin Protect Numbers 6106, and 6151
Consultant: AKM Consuflina Engineers
ITEM 5—72-INCH DROP MANHOLE, STA. 32+16.
This Rem compensates the Contractor for the relocation of a 72-inch sewer manhole from sewer
station 31+80 to 32+16, and to modify the standard manhole to a drop manhole. Contract drawings
show an existing 4-inch house connection to be located at sewer station 32+16. During construction it
was found that the 4-inch house connection was indeed an 8-inch sewer lateral,a manhole was
required to connect the 8-inch sewer lateral, and due to the elevation of the existing 8-inch lateral a
drop manhole was needed. The additional work consisted of modifying the standard manhole to a
drop manhole, and connection of the 8-inch sewer lateral. This hem was accomplished by
Contractor's Force Account and was determined by Sanitation District pursuant to Division 1, Section
44(B)2 of the General Requirements(Reference FCO No. 73).
ADDED COST THIS CHANGE ORDER ITEM: $8,245.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per
OCSD; ARB reserving its rights as
noted herein.
ITEM 8-6-INCH WATERLINE REMOVAL, STA. 26+80.
This item is for the extra cost to remove an abandoned 6-inch PVC water line located at approximate
sewer station 26+80, at El Camino Ave and Red Hill Ave intersection. During construction a 6-inch
PVC pipe was found 1.5-feet above the proposed sewer, and conflicted with the sewer trench. The
City of Tustin Water Department found that the water line was abandoned. The water line was not
shown in contract drawings. The additional work consisted of removal and disposal of approximately
10-feet of 6-inch PVC pipe, and compensation for four hours of standby. This item was accomplished
by Contractor's Force Account and was determined by Sanitation District pursuant to Division 1,
Section 44(B)2 of the General Requirements (Reference FCO No. 78)
ADDED COST THIS CHANGE ORDER ITEM: $2,468.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per
OCSD; ARB reserving its rights as
noted herein.
Page 4 of 6
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: AAR@.j C.C. C.O. No.: Nine 9
Date: July 19.2006
Job: Gisler Redhill North Trunk Sewer. Reach"A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Proiect Numbers 6106, and 6151
Consultant: AKM Consultino Engineers
ITEM 7—18-INCH SEWER PIPE REPLACEMENT, STA. 26+96.
This item is to compensate the Contractor for the additional costs to remove and replace
approximately 7-feet of 18-inch pipe with 24-inch pipe, at approximate sewer station 26+96. During
construction it was found that the connection sewer pipe between two adjacent existing manholes
was 18-inch in size and not 24-inch as shown in contract drawings. The size of the new sewer pipe
installed north of the upstream manhole was 27-inch and the size of the existing sewer pipe south of
the downstream manhole was 24-inch. The additional work consisted of core drilling at each
manhole, additional excavation, removal and replacement of approximately 7-feet of 18-inch sewer
pipe with 24-inch pipe, manhole improvement, and pavement removal and replacement. This Rem
was accomplished by Contractor's Force Account and was determined by Sanitation District pursuant
to Division 1, Section 44(B)2 of the General Requirements (Reference FCO No. 71).
ADDED COST THIS CHANGE ORDER ITEM: $34,897.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days per
OCSD; ARB reserving its rights as
noted herein.
TOTAL ADDED COSTS THIS CHANGE ORDER: $643,271.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
' Page 5 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB. INC. C.O. No.: Nine 9
Date: duly 19.2006
Job: Gisler Redhill North Trunk Sewer, Reach W. Contract No.7-36:Oranae
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements
Contract No. 7-41: and City of Tustin Project Numbers 6106. and 6151
Consultant: AKM Consul8ng Engineers
The compensation set forth in this change order comprises the total compensation due to the
contractor by OCSD, including all of contractor's subcontractors and suppliers,for the direct cost to
perform the work or change described in this Change Order, but does not include any compensation
for contractor's, or its subcontractors and suppliers,extra costs caused by or resulting from delays,
impacts(including productivity impacts)and/or disruptions arising out of, related to and/or caused by
the work or change described in this change order, if any. By executing this change order, contractor
shall not be deemed to waive its right to seek additional time and/or compensation for delays, impacts
(including productivity impacts) and/or disruptions arising out of, related to and/or caused by the work
or change described in this Change Order, all such rights and/or claims are hereby expressly
reserved by Contractor for itself and 'its subcontractors and suppliers. Nothing contained herein shall
be deemed as a waiver by OCSD of the contractors contractual obligations set forth in the contract
with OCSD for this project.
SUMMARY OF CONTRACT TIME
Original Contract Dale: April 5, 2004
Original Contract Time: 600 Calendar Days
Original Completion Date: November 25, 2005
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: 126 Calendar Days
Revised Contract Time: 726 Calendar Days
Revised Final Completion Due Date: March 31, 2006
Time Subject to Liquidated Damages: TBD
Actual Final Completion Date: N/A
Original Contract Price $18,375,999.00
Prev.Authorized Changes 9 2,515,681.00
This Change(Add) $ 643,271.00
Amended Contract Price 521.534.951.00
Page 6 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. ARB. INC. C.O. No.: Nine 9
Date: July 19,2006
Job: Gisler Redhill North Trunk Sewer. Reach"K. Contract No. 7-36, Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 741: and City of Tustin Proiect Numbers 6106, and 6151
Consultant: AKM Consulting Engineers
Board Authorization Date: July 19, 2006.
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Hardat Khublall, P.E. Date
CIP Project Manager
Approved by:
David A. Ludwin P.E. Date
Director of Engineering
Accepted by:
ARB, INC.
Contractor Date
EDMS.0 Wlll6
i F
r r�,r
�� r.`�: "1d:!'t { w,., e�C ., �'�.�"✓ �F'IFS,� J .tr' � ^'S
l
J
17t" Street
WN
7 � 39
Contract No. 7-36, 7.39 & 7-41 CHANGE ORDER NO. 9 July 19, 2006
� ".kA
r � '!
18-inch Storm Drain
a
Replacement 1
Item 1 — 18-inch Storm Dram, Sta. 161+80.
r
1
72-inch Manhole Shoring Installation 20-inch Water Line
Item 2 — 20-inch East Orange County Water District
Item 4 —Additional 8-inch Sewer Laterals, Sta. Water Line, Sta. 161+75,
16+68 and 17+88, EDM5:00331133]
PDC COMMITTEE Meetln9Date TOBd u(Dr.
07/06/06 071 i9/06
AGENDA REPORT Item Number Item Number
_ PDC06fi6 13(e)
Orange County Sanitation District
r Secondary Treatment
r
FROM: David Ludwin, Director of Engineering
Originator: Wendy Sevenandt, CIP Project Manager
SUBJECT: ACTIVATED SLUDGE PLANT REHABILITATION AT PLANT NO, 1,
JOB NO. P1-82
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 1 for Activated Sludge Plant Rehabilitation at Plant No. 1, Job
No. P1-82, with J. R. Filanc Construction Company, Inc., authorizing an addition of
$149,078 and a time extension of 101 calendar days, increasing the total contract
amount to $32,342,078.
SUMMARY
• The project consists of modifications and additions to the Blower Building, Aeration
Basin, and Secondary Clarifier Complex.
• The plans and specifications were prepared by HDR Engineering, Inc., and the
contract was awarded to J. R. Filanc Construction Company, Inc. on
June 22, 2005.
• Change Order No. 1 includes six items of added work and one item of deleted work.
There are no reimbursable design errors associated with this change order. There
are three Items included with this change order that involve extending the contract
time of completion. Liquidated damages on this contract are $4,000 per day and
there are no bonus provisions. The contract is now 34% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board to J. R. Filanc Construction Company, Inc. on
June 22, 2005.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 32,193,000
Previously Authorized Changes $ 0
This Change $ 149,078
Change Orders to Date $ 149,078
Percentage Increase to Date $ 0.46%
Final Contract Price $ 32,342,078
Page 1
BUDGETIMPACT
® This item has been budgeted. (Line Rem: CIP Budget, 131-82)
❑ This Rem has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date August 25, 2005
Original Contract Completion Date June 16, 2007
Total Number of Change Orders to Date 1
Final Completion Date September 25, 2007
Actual Completion Date N/A
Days Subject to Liquidated Damages N/A
Chance Order No. 1 Content
Item No. Description Amount Days Type
Contract
No.
P1-82
Orange County Flood Control Nonreimbursable Design
1 District Permit Specialist $2,875 80 Error
Nonreimbursable Design
2 Retaining Wall $117,431 0 Error
Concrete Addition At Staff Requested Design
3 Manholes $8,573 0 Change
Orange County Water District I Nonreimbursable Design
4 Shutdown Impacts $17,646 9 Error
Gas Company Pipe
5 Relocations $9,665 14 Unknown Conditions
Nonreimbursable Design
6 Fiber Optic Reroute $73,662 16 Error.
Staff Requested Design
7 Sheet Pile Modifications $80,774 0 IChange
Total -Change Order No. 1 149,078 101
Item 1 -This Rem is to provide for a permit specialist to facilitate and expedite the permit
process for work within the Orange County Flood Control District's (OCFCD) easement.
Working within the OCFCD's easement was not included in the original contract
documents.
Item 2—This item is to add an 80-foot long, 7.5-fact high retaining wall and modify the
route of utility lines to be relocated including natural gas, high pressure digester gas,
and fiber optic cabling. The retaining wall was not included in the original contract
documents.
Page 2
Item 3—This item is to raise the manhole lids and provide concrete pads around
manholes within a landscaped area to facilitate the removal of the manhole lids without
damaging landscaping and to keep the manholes from filling up with water. This work
was not included in the original contract documents.
Item 4—This item is to change the original construction sequence for the shutdown of
the 66-inch Secondary Effluent pipeline and provide additional sheet pile shoring to
protect an existing 72-inch operational reinforced concrete pipeline. This item
recovered nine days within the contract and mitigated the potential loss of reclaimed
water supply to OCSD.
Item 5 —This item is to modify the excavation for the utility lines identified in Item 2 as
required by the Gas Company to facilitate the relocation of the natural gas pipeline after
the contractor had already excavated the trench for relocating the utilities.
Item 6—This item is to reroute the existing fiber-optic lines that feed the Orange County
Sanitation District engineering trailer complex to allow for the demolition of the existing
duct bank which contained the fiber optic cabling. The relocation of the fiber optic lines
to the trailer complex was not included in the original contract documents.
Item 7—This item is to delete 275 lineal feet of sheet pile shoring and utilize an
open-cut section for the excavation. These modifications provide a credit to the
contract.
Items 1, 4, 5, and 6 involve time impacts to the construction schedule. A time impact
analysis of the project's schedule has been reviewed and verified by the Sanitation
District for each item. The contractor is reserving rights to claim for extended overhead
costs for items that impact the completion schedule.
ALTERNATIVES
No alternatives were considered.
CEQA FINDINGS
This project is exempt from CEQA under Section 15302. A Notice of Exemption was
filed at the County Clerk's office on November 4, 2003.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order
DF:DD:bm:eh
H:Ntglobaragenda Dan Repods�Dcw1a2 CONI 070606.doc
Page 3
BUDGET INFORMATION TABLE
Activated Sludge Rehabilitation
Job No. Pl-82
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS - ESTIMATED ESTIMATED
PROPOSED TOTAL
PROJECTIPRASE- AUTHORIZED. PROJECT NUGGET REVISED AUTNDAT EDT AUTHORIZATION EXPENDITURE TO EXPENDED
AUTHORIZATION BUDGET BUDGET' INCREASE BUDGET DATE 'REQUEST' _ GATE. TO DATE(Y.)
Phase 1-Proed Development $ 50,000 S 61,874 S 81,874 S 81,874 $ 81,874 $ 81,000 99%
Phase 2-Preliminary Design $ 448,000 $ 127,521 $ 127,521 $ 127.521 $ 127,521 $ 127,000 100%
Phase 3-Des n $ 2,688.000 5 4.322.514 $ 4.322,514 S 4,322.514 $ 4,322614 $ 4.325.000 100%
Phase 4-Consi chon $ 17.323,000 $ 38,233.685 $ 149,078 $ 38.382.763 $ 38,234.685 S 149.078 S 38,383.763 $ 11,500,000 30%
Phase 5-Commisslonin S 299.000 $ 838567 $ 838,567 $ 838.567 $ 8W567 $
Phase 6-Closeout $ 75,000 S 177,556 S 177.556 $ 177,556 - $ 177,656 S
Phase 7-Contingency S 2,987,000 S 3,231,363 $ . . 149078 S 3,082,285 $ -
PROJECT TOTAL 5 23,870,000 $ 47.013,080 $ - $ 47.013.080 $ 43,782,717 $ 149,078 $ 43931.795 $ 15,033,000 36%
Reimbursable Cos15
PROJECT NET $ 23.870,000 1 S 47,013,080 1 $ $ 47.013.080 I I S 43,782,717 1$ 148.07E 1$ 43.931.795 S 1C033,000 1 36%
PSA/Contraet
IDessanPEA I S 5.878342 $ 5,879.342 $ 5,879,342 S 5,879,342 1 $ 3.331,650 57%
Canstwdicn Conbact $ 32,193,000 1$,.. 149,078 S 32.342.078 11 $ 32.193.000 $ 149,078 $ 32,343,078 1 $ 11.000,000 34%
EDMS:003808872
CHANGE ORDER STATUS REPORT
ACTIVATED SLUDGE PLANT REHABILITATION AT PLANT NO. 1
JOB NO. P1-82
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(DAYS) (DAYS(
CONTRACT 6/22/2005 $ 32,193,000 $ 32,193, 0 0.00 660 660
CO.NO. 1 .Pending $. 149,075 $ 32,342;00078 =0.46' 101 761
EDMS:003808812
CHANGE ORDER PERFORMANCE REPORT
ACTIVATED SLUDGE PLANT REHABILITATION AT PLANT NO.1
JOB NO.P7-82,CHANGE ORDER NO.1
Contractor:FILANC CONSTRUCTION COMPANY,INC. Project Type:REHABILITATIONIEXPANSION
Design Consultant:NOR ENGINEERING,INC. Contract%Camphite:30% Original Contract Price: $32.193.000
CHANGE ORDER TYPES TRACKED INFORMATION ONLY
Reimbursable Design Non4teinburseble Design Sldteid DO Types
Unknown Condition Stan Requested Change Errors Enors Trsckedl Other Total
Change Orden $9,666 0.03% ($72.201) -0.22% $0 0.00% $211.614 0.66% $149.078 0.46% $0 0.00 $149.07 0.46%
this Period
Change Orders to $0 0. $0 0.00% $0 0.00% so 0. $0 0.00% SO 0.00%
Data
Change Order Total $9.666 0.03% ($72,201) -0.22% $0 0.00% $211,614 0,66% $149.078 0.46% SO 0.00% $119,078 0.46
Program <3.00% <1.00% O.DD% <1,00% <6.00% 000% <500%
Performance Goals
The Change Oular Menagemenl Plan Irsce,the Presiding bur aAange order"a
EDMSMU09212
Version WIRO 6
Page 1 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.R. Filanc Construction Company, Inc. C.O. No.: One(1)
Date: June 28, 2006
Job: Activated Sludoe Plant Rehabilitation At Plant No. 1 Job No. Pl-82
Consultant: HDR Enaineerino, Inc.
Amount of this Change Order(Add) $143,146.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions from
the contract price are hereby approved.
ITEM 1 —ORANGE COUNTY FLOOD CONTROL DISTRICT PERMIT SPECIALIST
This Rem provides for a permit specialist to facilitate and expedite the permit process for work within the
Orange County Flood Control District's(OCFCD)easement. The property line between the Orange
County Sanitation District(OCSD)and OCFCD property along the Santa Ana River was shown
incorrectly on the contract drawings. The project includes the construction of a new Secondary Clarifier
Complex,which requires relocating the existing utilities. OCSD staff recognized that the location of the
property line indicated on the contract plans was incorrectly shown, and the relocated utilities will be
installed on the OCFCD's property. As a consequence, the District had to obtain an easement permit
from the OCFCD. The work associated with relocating the utilities is on the project schedule's critical
path. Therefore, it was necessary for the District to expedite the permitting process in order to mitigate
any delays to the project. A permit specialist was commissioned to expedite the permit process to
minimize the delay impacts to the project. The costs associated with this Change Order item were
agreed upon with the Contractor pursuant to Section 44 (C) 1 of the General Requirements. The
extension of time request associated with this work was agreed upon with the Contractor pursuant to
Section 44(B) of the General Requirements(Reference FCO-P182-03).
ADDED COST THIS CHANGE ORDER ITEM: $2,875.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 80 Calendar Days
ITEM 2—RETAINING WALL
This Rem is for all labor, material, and equipment to add an 80-foot long, 7.5-toot high retaining wall and
to modify the route of utility lines to be relocated including natural gas, high pressure digester gas, and
the interplant fiber optic cabling. The work to construct the retaining wall was not included in the
original contract documents. This item is needed as a consequence of the incorrectly located OCFCD
property line on the contract plans as described in Item 1. The eastern edge of the access road and
utility lines that are rerouted to facilitate the construction of the new Secondary Clarifier Complex falls
within the OCFCD property easement. The contract plans indicate that the finished grade in this area
is flat; however, it is actually a sloped embankment. As a result, a retaining wall must be constructed to
retain
the soil embankment for the roadway. Additional work elements include fence modifications, rerouting
the 6" plant water pipeline, and site work. The costs associated with this Change Order item were
agreed upon with the Contractor pursuant to Section 44 (C) 1 of the General Requirements (Reference
FCO-P182-06).
ADDED COST THIS CHANGE ORDER ITEM: $117,431.00
,
Page 2 of 6
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.R. Filanc Construction Company, Inc. C.O. No.: One 1
Date: June 28, 2006
Job: Activated Sludge Plant Rehabilitation At Plant No. 1 Job No. P1-82
Consultant: HDR Engineering Inc.
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 3—CONCRETE ADDITIONS AT MANHOLE
This Item is for all labor, material, and equipment necessary to add concrete pads around manholes
constructed within both new and existing landscaped areas. The concrete pads were not included in
the original contract documents. The concrete pads facilitate the removal of the manhole covers
without destroying the landscaped areas. The manhole lids were also raised to keep the manholes
from filling up with water during watering of the landscaped area. The costs associated with this
Change Order Item were agreed upon with the Contractor pursuant to Section 44 (C) 1 of the General
Requirements. The extension of time request associated with this work was agreed upon with the
Contractor pursuant to Section 44(B)of the General Requirements (Reference FCO-P182-04).
ADDED COST THIS CHANGE ORDER ITEM: $8,573.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4—ORANGE COUNTY WATER DISTRICT SHUTDOWN IMPACTS
This item changes the original construction sequence for the shutdown of the 66-inch Secondary
Effluent pipeline and for providing additional sheet pile shoring to protect an existing 72-inch
operational pipeline. This work was requested by the Sanitation District Staff to minimize impacts and
coordinate project activities between OCSD and the Orange County Water District, This Rem changes
the work sequences necessary to install the new 66-inch CMLCS Secondary Effluent pipeline. As a
consequence,the Contractor incurred loss of production with both labor and equipment, and was
required to dewater the existing 66-inch Secondary Effluent pipeline and provide additional shoring to
protect the existing 72-inch pipeline. The costs associated with this Change Order item were agreed
upon with the Contractor pursuant to Section 44 (C) 1 of the General Requirements.The extension of
time request associated with this work was agreed upon with the Contractor pursuant to Section 44(B)
of the General Requirements(Reference FCO-P182-05).
ADDED COST THIS CHANGE ORDER ITEM: $17,646.00
TIME EXTENSION THIS CHANGE ORDER ITEM: -9 Calendar Days
,
Page 3 of 6
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.R. Flanc Construction Company, Inc. C.O. No.: One(1)
Date: June 28, 2006
Job: Activated Sludge Plant Rehabilitation At Plant No. 1.Job No. Pt-82
Consultant: HDR Enaineerina, Inc.
ITEM 5—GAS COMPANY PIPE RELOCATIONS
This item is for all labor, material,and equipment necessary to modify the excavation near the OCFCD
easement identified in Item 1, as required by the Gas Company,to facilitate the installation of the
relocated natural gas line. This change is needed as a result of the Gas Company's requirement to
provide specified bends and minimum clearances around the relocated gas pipeline. The Gas
Company did not disclose the requirements for bends and clearances until their staff mobilized on the
project site to perform the work. The relocation of the gas line was originally included in the
Contractor's scope of work. However, the Gas Company informed the District that the work to relocate
the natural gas line owned by the Gas Company could only be performed by the Gas Company
employees and approved contractors. The Contractor had already excavated the trench for the natural
gas, high pressure digester gas, and fiber-optic utility lines when the Gas Company staff examined the
excavation and required modifications to the trench. It was necessary for the Contractor to backfill and
re-excavate the trench in order to meet the requirements of the Gas Company. The Contractor
provided a credit to the District for the portion of the work that was removed from their scope of work
and performed by the Gas Company. The costs associated with this Change Order Rem were agreed
upon with the Contractor pursuant to Section 44 (C) 1 of the General Requirements. The extension of
time request associated with this work was agreed upon with the Contractor pursuant to Section 44 (B)
of the General Requirements(Reference FCO-P182-07).
ADDED COST THIS CHANGE ORDER ITEM: $9,665.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 14 Calendar Days
ITEM 6—FIBER OPTIC REROUTE
This item is for all labor, material, and equipment necessary to re-route the existing fiber-optic lines that
feed the Orange County Sanitation District trailer complex to allow for the demolition of the existing
12 KV duct bank,which currently contains the fiber—optic cabling. The relocation of the fiber-optic
lines to the trailer complex was not included in the contract. It was necessary to re-route the fiber-
optic lines prior to the demolition of the existing duct bank, which, per contract, will be demolished to
install the new 66-inch CMLSCS Secondary Effluent pipeline. Items of work include the reinstallation
of existing 7-cell tube cable and 100-pair copper cable, terminating existing fiber bundles at the PEDB
Pedestal, installing new 7-cell tube cable, and installing new fiber bundles (approximately 2,000 lineal
feet). The costs associated with this Change Order item were agreed upon with the Contractor
pursuant to Section 44 (C) 1 of the General Requirements. The extension of time request assoctated
with this work was agreed upon with the Contractor pursuant to Section 44 (B) of the General
Requirements(Reference FCO-P182-08).
ADDED COST THIS CHANGE ORDER ITEM: $73,662.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 16 Calendar Days
f
Page 4 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.R. Filanc Construction Company, Inc. C.O. No.: One(1)
Date: June 28,2006
Job: Activated Sludge Plant Rehabilitation At Plant No. 1. Job No. P1-82
Consultant: HDR Engineering Inc.
ITEM 7—SHEET PILE MODIFICATIONS
This item deletes 275 lineal feet of sheet pile shoring from the contract and utilizes an open cut method
for the work required to perform trench excavation for the 66-inch Secondary Effluent CMLCS pipeline
south of the secondary clarifiers. This item results in a credit to the contract. The work was performed
pursuant to Section 44(C) 1 of the General Requirements (Reference FCO-P182-09).
ADDED COST THIS CHANGE ORDER ITEM: ($80,774.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL ADDED COST THIS CHANGE ORDER: $149,078.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 101 Calendar Days
` Page 5 of 6
ORANGE COUNTY SANITATION DISTRICT
103"ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.R. Filanc Construction Comoanv Inc. C.O. No.: One 1
Date: June 28, 2006
Job: Activated Sludge Plant Rehabilitation At Plant No. 1. Job No. P1-82
Consultant: HDR Engineering, Inc.
The additional work contained in this Change Order can be performed incidental to the prime work and
within the time allotted for the original contract and any extensions to the contract time made by this
and all previously issued Change Orders. District and Contractor mutually agreed that no additional
time is required for the work contained in this Change Order and the added cost described above
constitutes full and equitable consideration for all the impacts incurred by the Contractor, and no other
direct or indirect, incidental or consequential costs, expenses, losses, or damages have been or will be
incurred by Contractor, except as expressly granted and approved by this Change Order, except that
consideration of potential allowable extended general condition costs the Contractor may incur by
reason of the additional contract time allowed per this contract change shall be reserved until
appropriately incurred and determined.
SUMMARY OF CONTRACT TIME
Original Contract Date: August 25, 2005
Original Contract Time: 660 Days
Original Completion Date: June 16,2007
Time Extension this C.O.: 101 Days
Total Contract Time Extension: 101 Days
Revised Contract Time: 761 Days
Revised Final Completion Due Date: September 25, 2007
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: N/A
Original Contract Price $ 32,193,000.00
Prev. Authorized Changes $ 0.00
This Change (Add) (Pedust) $ 149,078.00
Amended Contract Price $ 32,342,078.00
Page 6 of 6
ORANGE COUNTY SANITATION DISTRICT
IDS" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.R. Filanc Construction Company, Inc. C.O. No.: One(1)
Date: June 28, 2006
Job: Activated Sludge Plant Rehabilitation At Plant No. 1.Job No. P1-82
Consuhant: HDR Engineering, Inc.
Board Authorization Date: June 28, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Wendy Sevenandt Date
CIP Project Manager
Approved by:
David A. Ludvdn, P.E. Date
Director of Engineering
Accepted by:
J. R. FILANC CONSTRUCTION COMPANY, INC.
Contractor Date
EDMS.0038M73
PDC COMMITTEE nreenyDate TOBd ofm
07/06/06 07/19/06
AGENDA REPORT Hwn Number Rem Number
PDC06-67 13(n
Orange County Sanitation District
kSecondary Treatment
FROM: David A. Ludwin, Director of Engineering
Originator: Kathy Millea, CIP Project Manager
SUBJECT: TRICKLING FILTERS AT PLANT NO. 2, JOB NO. P2-90
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 2 to the Professional Services Agreement with Broom and
Caldwell to provide additional design services for Trickling Filters at Plant No. 2, Job
No. P2-90, for an additional amount of$397,680, increasing the total amount not to
exceed $10,083,220.
SUMMARY
• Job No. P2-90 is one of four design projects designated by the Capital
Improvement Program (CIP) as required in order to meet the Orange County
Sanitation District's (Sanitation District) goal of Secondary Standards. Job
No. P2-90 has an EPA Consent Decree date of February 15, 2011 for
construction completion.
• Staff is requesting additional design services from Brown and Caldwell to perform
supplemental geotechnical and hydrogeologic investigations on the Job
No. P2-90 job site.
• The Director of Engineering recommends the approval of Amendment No. 2 to
the Professional Services Agreement with Brown and Caldwell for Job
No. P2-90, Trickling Filters at Plant No. 2, in an amount of $397,680, increasing
the total amount not to exceed $10,083,220.
PRIOR COMMITTEE/BOARD ACTIONS
• Approval of Professional Services Agreement with Brown and Caldwell in June
2004 for an amount not to exceed $9,586,445.
• Award of$250,853 for construction of Contract No. P2-90A, Oil Well Excavation
and Abandonment, in June 2006.
PROJECT/CONTRACT COST SUMMARY
Approval of $397,680 from Contingency for additional design services is being
requested.
Page 1
BUDGETIMPACT
® This item has been budgeted. (tine item: 2006-07 CiP Budget, section s,Page 56)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The purpose of Job No. P2-90 is to design and construct a new 60 MGD trickling filter
facility. Major components of the facility include a primary effluent diversion structure, a
108-inch primary effluent feed pipeline, three 150-foot diameter trickling filters, a
trickling filter pump station, four sludge reaeration reactors, four solids contact reactors,
six 135-foot clarifiers, an odor control system, a chemical station, an electrical
distribution center, three return sludge pump stations, and a 120-inch diameter
secondary effluent pipeline.
Job No. P2-90 will require extensive excavation and dewatering activities at its Plant
No. 2 location. Recent hydrogeologic problems on the construction site adjacent to the
P2-90 site have emphasized the potential of increased risk of similar problems occurring
on Job No. P2-90. Similar hydrogeologic problems on the P2-90 project would not only
result in costly change orders, but add a lengthy delay to the project schedule. The
supplemental investigations will include a groundwater pump test and the establishment
of a geotechnical baseline report to provide bidders with more data to estimate the cost
of dewatering in this area. Also included is additional potholing investigation to locate
existing buried utilities that may not be shown on the as-built drawings. This under-
ground investigation will reduce the number of unknown conditions involved in the
underground work, and therefore reduce the risk of change orders during construction.
Job No. P2-90 will be constructed on a site that is known to have four abandoned oil
wells. The project excavation will require the top portion of these oil wells to be
removed. Once cut, the oil wells must be inspected for "approval of reabandonment" by
the State of California, Department of Oil, Gas and Geothermal Resources. This work
is being performed before the construction of Job No. P2-90 to ensure that unknown
conditions common with underground work will not delay the P2-90 construction
schedule. Contract No. P2-90A, Oil Well Excavation and Reabandonment, was
awarded to J.F. Shea at the June 2006 Board meeting for$250,853.
ALTERNATIVES
Do not perform additional geotechnical testing and underground utility verification. This
alternative is not recommended as there is a probable chance of encountering unknown
conditions during construction. This would not only result in a change order during
construction, but also delay the schedule on a time critical project that must meet an
EPA Consent Decree.
Page 2
CEQA FINDINGS
Job No. P2-90, Trickling Filters at Plant No. 2, was included in the Secondary Treatment
and Plant Improvement Project Subsequent Environmental Impact Report (SEIR). The
SEIR was certified on May 25, 2005 and a Notice of Determination was filed on
May 26, 2005.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Brown and Caldwell Amendment Proposal
KM:kf
H9ntg1obaMgenda Drefl ReWdstPDCP2-90 AR,Amendment No.2,July 20D6 PDC.dm
Page 3
BUDGET INFORMATION TABLE
Job No. P2-90
Trickling Filters at Plant No. 2
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS ' PROPOSED ESTIMATED ESTIMATED
PROJECT/PHASE AUTHOR12E0 PROJECT . . BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE IDELREASE BUDGET DATE - REQUEST AUTHORIZATION TO DATE DATE(%)
Phase I-Pmed Development $ 100,000 S 293,000 $ - $ 290.W0 M3.446,M $
$ - $ 293,000 $ 293,000 100%
Phase 2-Pmfttna Devi n $ 1.305,000 S 3,446,WD $ - S 3.00.000 $ - S 3,448000 S 3.446.W0 1p0%Phase 3-De " n $ 12,168,0W $ 7.848,W0 S 3W,680 $ 8245.880 S 397,680 S IL245.680 $ 7.400.000 90%
Phase4-Ccnstnlo8on S 96,832AW $ 203,351,DW S - S 203 51000 $ SAMO N S 0%
PhaW5-Commotion' $ 871,W0 S 1.571,W0 S - S 1,571.000 S - S 1.071,W0 $ 0%
Phase 6-Close-Ou1 $ 219000 S 733.000 f - S T33,0W S S 560.000 $ 0%
Phase 7-ConO S 17,412.000 $ 31,289,1100 f 7 S 3D.891.32D -. $ - S - $ - $ 0%
PROJECT TOTAL S 128,727,000 $ 248,531.000 S - $ 248.531,000 S 23,099.OW 1 S 397.680 S 23,495,680 $ 11,139,08D 47%
0.eimbumable Costs S S
PROJECT NET S 128,727,000 S 246.531.000 S - S 248,531.000 $ 23,098.000 $ 397,680 $ 23.495.680 $ 11,139,000 47%
PSAIContr ct
n PSA $ 12,076.353 1 S 9.685,540 S 397.680 1 S 10.083,220 $ 9.685,540 $ 397,680 $ 10.083.220 $ 7.450.000 74%
Consaucoon Contrail P2-90 S 87,761A82 1 S 185.749.147 1$ -I S 155.749,147 S - $ - $ .11 0%
Con5W0Wn Conl2 P2-WA $ - $ 250.853 1$ -I S 00.853 ,1 S 250.653 $ - S 250.853 1 S 0%
PSAMm ft lNo.2
J42 POC Aop—al
MOMS:NMI19M
Professional Services Agreement Status Report
TRICKLING FILTERS AT PLANT NO. 2
JOB NO. P2-90
Total Project Budget: $248,531,000
Consultant: Brown and Caldwell
Start Date of Design: February 25, 2004
Date Amendment Description Cost Accumulated
Costs
6/23/04 Original PSA Original Design Services $ 9 588 445 $9 588 445
6/28/06 1. Additional Design Services $99 095 $9 885 540
Pendin 2 Construction Support Services $397 680 $10 083 220
.DM Approwl June low
EDMS:003812013
JULV ZOOS PDC—Amendmem No.2
PDC COMMITTEE rAeetlg ate TO Bd.o dr.
07/O6/06 W/19I06
AGENDA REPORT Itan Neu r0em3amber
PDCOrange County Sanitation District
Utility Systems
FROM: David Ludwin, Director of Engineering
Originator: David MacDonald, Project Manager
SUBJECT: AIR QUALITY IMPROVEMENTS, JOB NO. J-79
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 3 to the Service Contract with NRG Thermal Services, LLC
providing for additional field services for Air Quality Improvements, Job No. J-79, for an
additional amount of$90,483, increasing the total not to exceed amount to $2,338,437.
SUMMARY
• NRG Thermal Services, LLC has completed the modification of eight turbochargers
on each CGS engine to reduce the NOx emissions.
• This Amendment includes $50,161 for tax on the equipment purchased. At the time
this contract was originally approved, the amount of tax was unknown. NRG's
proposal specifically excluded tax. The additional $40,322 is for programming that
was required to make the engines comply with SCAQMD requirements.
PRIOR COMMITTEE/BOARD ACTIONS
See attached Service Contract Status Report
PROJECT/CONTRACT COST SUMMARY
The requested action will increase the NRG Thermal Services, LLC contract from
$2,247,954 to $2,338,437, as shown on the attached Service Contract Status Report.
The $90,483 increase to the NRG Thermal Services, LLC contract will come from the
existing budget. Please see the attached BIT.
BUDGETIMPACT
F1 This item has been budgeted. (Line Item: Fv 06/07 Budget Book, Page 48
[Pending approval by the Board on June 28, 2006])
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
Page 1
r�
ADDITIONAL INFORMATION
NRG Thermal Services, LLC was awarded a service contract, dated April 14, 2004, to
modify the turbochargers on the eight CGS engine for higher air flow rate which lowers
the combustion temperatures and minimizes NOx formation.
Amendment No.1 increased the Scope of Work to modify the engine cooling systems
for an additional cost of$677,763. This was necessary because the turbo chargers
were causing the engines to run too hot. Amendment No. 2 increased the Scope of
Work to modify the engine operating codes for no additional cost.
In their request for final payment, NRG Thermal Services, LLC requested a contract
increase of$176,179. Staff negotiated a settlement which will pay NRG Thermal
Services, LLC $50,161 for sales tax on materials supplied. Staff also negotiated a cost
of$40,322 for the additional work of programming the engine operating codes. The
final negotiated contract increase is $90,483. Staff could not justify the entire $176,179
requested by NRG Thermal Services, LLC. NRG Thermal Services, LLC has agreed to
$90,483 and will re-invoice for this amount once this Amendment is approved.
This project is complete and the eight engines are operating at reduced NOx levels and
are in compliance with current SCAQMD NOx regulations.
ALTERNATIVES
Deny the request for any additional funds, which will result in a formal claim by NRG
Thermal Services, LLC against the District.
CEQA FINDINGS
This project is categorically exempt from CEQA.
ATTACHMENTS
1. Budget Information Table
2. Services Contract Status Report, NRG Thermal Services, LLC
DM:eh:kf:bm
H:lntglobaftAgende Draft ReportstPDC%R NRG amendment 3.dm
Page 2
BUDGET INFORMATION TABLE
JOB NAME: Air Quality Improvements
JOB NO. J-79
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
BUDGET
PROJECT/PHASE AUTHORIZED PROJECT RENSED AUTHORIZED TO AUTHORIZATION. TOTAL. EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE BUDGET DATE REQUEST: AUTHOWATION TO DATE DATE(%)
/DECREASE
Phase l -Project Development $ 49 7E $ 78.000 S 78,OOD - $ 78.000 $ 78.000 $ 79.287 102%
Phase 2-Pmlimmwy Oe ' $ 39D.024 S 412,000 S 412,000 $ 02000 S - $ 413000 S 414.610 101%
Phew 3-Om n S 617,022 S 3530000 $ 3.530.000 S 3.530,000 S 3.530,000 S 2.365.336 67%
Phan 4-Conctmctbn $ 4,064,103 f 2,511.000 5 2,911J100 S 2.720517 $ 00,483 S 2,811.000 $ 2.547,739 91%
Phan 5-Commissioning S N385 S 1,XI S 1,000 -`. $ 1,D00 $ 1,000 $ 617 62%
Phaw6-Cbw-0W S 25,258 $ 25.X0 $ 25,0E '- S 25,X0 $ 25.000 $ 0%
Phase 7-Confir,tam $ 350 X0 $ 309,0E $ 309,000 S 309,000 S 309 0E $ BIG D%
PROJECTTOTAL $ 5A40,501 S 7,166.000 $ - $ 7,166.000 $ 7.075,517 $ 90,483 It 7,166.000 S 5,408,271 76%
Reimbursable Costs
PROJECT NET S 5,440.601 f 7.166,X0 1 It - $ 7,166000 $ 7,075,517 1 S 90.483 1 $ 7,166,000 S 5,408,271 1 75%
PSAIContract
Des' nPSA.Malcon Pwie S 617,022 I S 3.198.010 1 S - $ 3.198.010 11 $ 3.198,010 $ - S 3,198.010 1 S 2,400,D00 75Y.
Constmction Contract:NRG 5 4054.103 1 S 2.247664 1 S 90.483 S 2.333.437 $ 2,247.954 1 S 90487 1 S 2.338437 S 2.339.437 7X%
EDM5:0030104120
Service Contract Status Report
Air Quality Improvements
Contract/Job No J-79
Total Project Budget: $7,166,000
Consultant: NRG Thermal Services, LLC
Date Amendment Description Cost Accumulated
Costs
Original Modify turbochargers on eight CGS engines plus
4/14/2004 Service
Contract one spare $1,570,191 $1,570,191
9/22/05 1 Modify cooling water systems on eight CGS
engines $677 763 $2,247,954
1/21/05 2 Modify operating codes on eight CGS engines
$ 0 $2,247,954
Pending 3 Add sales tax and modify operating codes on
eight CGS engines $90,483 $2,338,437
EDMS 003810821
OBI29Po6
BOARD OF DIRECTORS MeeOngDate Toad.or.
07/0
6/0
6 07/19/Ofw6
AGENDA REPORT Item Number IMMNUmnar
PDC06-69 13(h)
Orange County Sanitation District
Collections
Facilities
FROM: David Ludwin, Director of Engineering
Originator: David May, IPMC Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION, JOB NO. 1-2-4
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the Professional Services Agreement with Earth
Tech, Inc. for Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, providing for the
additional construction management services, for an additional amount of$478,693
increasing the total amount not to exceed $2,531,286.
SUMMARY
• Earth Tech, Inc. (ETI) was awarded a construction management services contract in
November 2005 by the Board of Directors. At the time of award, it was thought
that Steve P. Rados (SPR) would be performing the work at the Ellis/Bushard
intersection. Subsequent to ETI contract award, the intersection work was awarded
to Mike Bubalo Construction Company, Inc.
• Additional construction management services are required to administer two
separate contracts and contractors, provide full time inspection at two separate
work sites, provide overtime inspection hours at both work sites, and coordinate
extensive permit conditions with the cities of Fountain Valley and Huntington
Beach.
• Staff requested a proposal from ETI for additional services. The initial proposal of
$627,000 has been negotiated to the current proposal amount of$478,693. The
proposal contains additional time for a resident engineer, inspectors, and support
staff to administer schedule, correspondence, and contract issues.
PRIOR COMMITTEEIBOARD ACTIONS
A construction management services contract was awarded to ETI on
November 16, 2005. Please see the attached PSA Status Report.
PROJECT/CONTRACT COST SUMMARY
Please see the attached Budget Information Table for estimated expenditures to
date on this contract. This request is for an authorization of$478,693 for
Amendment No. 1 to the PSA awarded to ETI in November, 2005.
Page 1
BUDGETIMPACT <
® This Rem has been budgeted. (Line item: FY O6107 Budget Book, Page 48
[Pending approval by the Board on June 28, 20061)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
The budget for this project was approved and authorized under the Collections
Facilities category. See attached Budget Information Table. The Fiscal Year
2006/2007 budget approved by the Board includes an allowance for this
amendment amount. No additional budget is being requested.
ADDITIONAL INFORMATION
Planning for the restart of construction on the Bushard Trunk Sewer started in
June 2005. A pipe procurement contract was awarded in September 2005. Next,
the construction management services contract was awarded to ETI in November 2005.
Then a contract for Ellis/Bushard intersection construction was awarded to Mike Bubalo
Construction Company, Inc. in February 2006.
In March 2006, Steve P. Rados resumed work on the Bushard Trunk Sewer
Rehabilitation, Job No. 1-24. Work began on Bushard Street at Panacea Drive and
proceeds north. ETI is providing construction management services for the Orange
County Sanitation District (Sanitation District)for this work.
In May 2006, work began at the Ellis/Bushard intersection. Mike Bubalo Construction
Company, Inc. is performing this work. ETI provides construction management services
for this work also.
When ETI was awarded their contract in November 2005 the Sanitation District had just
rejected an extra work proposal by Steve P. Rados to perform work in the Ellis/Bushard
intersection. Subsequent to this, the intersection work was packaged for a separate
public bid and Mike Bubalo Construction Company, Inc. was awarded the contract.
Thus, the ETI scope of services was created prior to November 2005 and assumed
Steve P. Rados performing work at the intersection. The ETI Scope of Work, while
covering the facilities to be constructed in the intersection, did not cover the following:
• Administering two separate contracts and contractors, keeping files,
providing separate correspondence, monitoring a separate schedule, etc.
• Providing full time inspection services at two separate work sites
simultaneously.
In addition, both Steve P. Rados and Mike Bubalo Construction Company, Inc. are
working longer than a normal eight hour work day. This requires more inspection time
per day than originally scoped in the ETI contract. Staff is not opposing the longer work
days as they are in compliance with city ordinances and contract terms. The long work
day also mean less overall duration of the projects. This shortens the nuisance impacts
of the projects to the adjacent communities near each project work area.
Page 2
Y Permit conditions for both contractors have been extensive. The permit issued to Steve
P. Rados includes a copy of the Cooperative Agreement between the Sanitation District
and the City of Huntington Beach. This agreement lays out conditions that are more
extensive than normally issued for encroachment permits. Also, because of past
troubles with traffic control and nuisance impacts violations, the cities are more adamant
about permit condition compliance and enforcement. ETI has performed extensive
coordination with the Cities of Huntington Beach and Fountain Valley to stay within the
permit conditions. The intensity of this effort is more than what was originally
contemplated in the contract Scope of Work.
Staff requested a proposal from ETI for additional services in March 2006- Since then,
staff has negotiated from an initial proposal of$627,000 to the current proposal amount
of$478,693. The proposal contains additional time for a resident engineer, inspectors,
and support staff to administer schedule, correspondence, and contract issues. A copy
of the proposal letter and task by task request for additional labor hours is attached for
reference.
ALTERNATIVES
Approve Amendment No. 1 to the ETI contract for the additional construction
management services.
Utilize staff to perform construction management services. ETI would be responsible for
some services provided during work in the intersection. However, staff would be
primarily responsible and would provide the Resident Engineer and Inspectors needed.
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program EIR certified on
October 27, 1999. A Notice of Determination was filed on October 29, 1999.
Additional CEQA documentation for the project was included in Addendum No. 3 to
the EIR approved on December 19, 2001. Addendum No. 8 to the program EIR was
certified at the February 2006 Board meeting. These Addenda do not change CEQA
findings.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Copy of the Earth Tech, Inc. Proposal Letter
DM:sp:kf
K% lglob Mgenda Draft ReW0s%PDCV-2�-AR Eadh Tech Amend No, 1 07WW,dw
Page 3
BUDGET INFORMATION TABLE
Bushard Trunk Sewer Rehabilitation
JOB NO. 1-2.4
DATE(%
PROPOSED
ORIGINAL CURRENT PROPOSED FUNDS THIS ESTIMATED ESTIMATED
BUDGET PROPOSED TOTAL
PROJECTJPNASE AUTHORIZED PROJECT REVISED - AUTHORIZED TO AUTHORIZATION EXPENDITURE E% TO
INCREASE AUTHORIZATION
BUDGET BUDGET ` BUDGET DATE REQUEST TO GATE DATE(%)
(DECREASE
PIvs.1-Prow Development $ 74,000 3 74,000 S 74.000 $ 74.000 $ 74.000 S 94.649 101%
Pheee 2-PWmnsq O.Ng. S 10.= S 10.000 E WWII S 10,000 S 10.000 S 9,148 91%
Phase 3-OIgn E 2.166= S 2,160,000 $ 2.106A00 J' $ 2,168.000 $ 2.168.000 S 2.175.812 100%
Phase 4-Conm=Oon IS 48,142.000 $ 53,867.069 S 53,967.0el ;;. S 49.659,113 S 478693 S 54137606 $ 26.233,911 52%
P e 5-CommMlonmg $ 418000 3 418,000 S 416,000 "• S 326,000 $ 3M.000 S 251,509 TT%
Phow 6-Cloe ul $ 72.000 S 72000 S 72,000 $ 40,000 $ 401000 $ 1,657 4%
Phase T-CaMin e $ 2,698,000 S 6.972.941 $ 6,972,941 "- E 2696.e00 S 2.898,000 0%
PROJECTTOTAL $ 53,560,000 S 63.580.000 S - S 63.580.000 f( $ 54975,113 $ 478,693 $ 55,453.806 S 28]4Q685 52%
Rambumable Ceeta I I I 1 1 $ (60,795)�
PROJECT NET $ 53,Sa0.000 I E 63,580,000 $ - S 63,580.000 +' $ 54,975.113 1 S 478.693 S 55A53ADS 1 $ 28.OW,461 52%
PSMContract
PDSA-Boyle S 845300 S 2.07,825 S 2A67.825 'i S 2,467,825 $ 2,467825 S 2.335.715 95%
PDSA-EaM Tech S 2.(XXLW0 S 2,052593 S 478.693 S 2.531.286 $ 2,052,593 $ 478893 $ 2.531.288 S SC033 3%
PDSA-Makdm Pimle S - S 2M."5 S 22SWS $ 223,046 $ 223,045 S 79.Z67 36%
PDSA-Abed Groser $ - 3 153,000 3 153,000 lrl S 153.000 $ 163.000 $ 66m 58%
CoMr l-24P-Ameroo S - $ 7,884.725 $ 7.884725 r $ 7,884,725 S 7.BM,725 $ 0•b
424 CaMraU-Ratloe E 30.003,212 S 30,IS,81T S 30,426,817 '.11 S 30,41M.917 $ 30,428,81T S 19,727,2M 65%
H2M ConiroU-Bubeb S 10,000.000 $ 11,191.500 $ 11,191.500 3 11,191.500 S 11.191,500 $ O%
Soulhem Ceebmie Etliwn $ - S 350,000 S 350.000 i' $ 350.000 S 350000 E 0%
:D%8O 1110
Professional Services Agreement Status Report
BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4
Total Project Budget: $53,580,000
Consultant: Earth Tech Inc.
Date Amendment Description Cost Accumulated
Costs
Construction Management Services for
11/16/05 Original PSA replacement of Bushard Trunk Sewer and $2,052,593 $2,052,593
Associated Facilities.
Pending 1 Additional Construction Management Services to $478 693 $2,531,286
account for 1-24A separate contractor
EDMS:0OW11357
06129/06
PDC COMMITTEE Mee ;Dale TO%Or Dr.
• 07/Ofi/W 071 9106
AGENDA REPORT Item Number Item Number
PD006-70 130)
Orange County Sanitation District
- Primary Treatment
FROM: Dave Ludwin, Director of Engineering
Originator: Mike Puccio, Project Manager
SUBJECT: PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES,
JOB NO. P1-37
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 8 to the Professional Services Agreement with Brown and
Caldwell, providing for additional engineering services for Primary Clarifiers 16-31 and
Related Facilities, Job No. P1-37, for an additional amount of$588,575 increasing the
total amount not to exceed $6,787,436.
SUMMARY
• Job No. P1-37, Primary Clarifiers 16-31 and Related Facilities, includes the
construction of 16 new primary clarifiers with support equipment, improvements to
the existing Primary Clarifiers 6-15, and improvements to Primary Clarifiers 1-5.
• Brown and Caldwell prepared the plans and specifications and the contract was
awarded to Margate Construction on October 24, 2001. The project is
approximately 90% complete with an estimated completion date of
February 5, 2007.
• Brown and Caldwell's current Scope of Work for this project includes $2,678,957 in
construction support services. The amount designated in Amendment No. 7 for this
work will not be sufficient to complete the project due to significant time delays on
the project completion.
• The delays on the project total 465 days and are the result of a variety of reasons
including unknown structural conditions discovered during excavation, and changes
to equipment tags required by the Computer Maintenance Management System.
Since the last amendment, there have been approximately 313 days added to the
project, which equates to a 22% increase in project time. In 2005, the consultant
averaged approximately $50,000/month and at that rate would need approximately
an additional $550,000 to account for the 11 months added to the project since the
last Amendment.
• The proposed amended Professional Services Agreement (PSA) is 9.4% of the
$73,000,000 construction contract. This includes both Design and Construction
Support Services. Staff believes this is reasonable for the required professional
services for a project of this magnitude and complexity.
a«be.W16" Page 1
• Amendment No. 8 continues the construction services such as project management,
RFIs, submittals and onsite engineering to project completion, and also includes
geotechnical engineering resources for inspection and review of the foundation
support system under the existing clarifiers, startup, and commissioning support to
provide technical guidance and testing procedures during facility initial operation.
PRIOR COMMITTEEIBOARD ACTIONS
Please refer to the attached PSA Status Report for all previous General Manager,
Committee, and Board actions.
PROJECT/CONTRACT COST SUMMARY
Authorization of$588,575 is being requested under Phase 4 — Construction. A budget
reallocation of$588,575 from Phase 7 — Contingency to Phase 4 —Construction is also
being requested. The total budget remains at $89,760,533. Please see the attached
Budget Information Table.
BUDGETIMPACT
® This item has been budgeted. (Line Rem: section 8, CIP, P137)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Background
The Orange County Sanitation District's (Sanitation District) Strategic Plan requires
additional primary treatment capacity at Plant No. 1 and the project Primary Clarifiers
16-31 and Related Facilities, Job No. P1-37 was developed to meet this demand. In
September 1998, a PSA for$1,933,000 was issued to Brown and Caldwell for
preliminary design studies and design services. This project includes the design of
96-mgd of primary treatment facilities and improvements to existing Primary Clarifiers
6-15.
In January 1999, Brown and Caldwell submitted the Final Project Report, which
included results of preliminary design studies which were conducted in an effort to
optimize the operation and maintenance of all primary clarifiers and related facilities at
Plant No. 1.
Amendment No. 1, which was approved In April 1999, increased the contract amount
$863,185, for a total PSA amount of$2,856,185. When the original PSA was approved,
the Scope of Work included studies for optimizing the Plant No. 1 primary treatment
process. Options that were found to be cost-effective in the studies were added to the
design Scope of Work through Amendment No. 1.
.. .1. Page 2
Amendment No. 2, which was approved in November 1999, increased the contract
v amount $21, 557 for a total PSA amount of$ 2,877,742. This additional work involved
an investigation of high rate clarifiers located throughout Canada and Europe.
Amendment No. 3, which was approved in December 1999, increased the contract
amount $189,537 for a total PSA amount of$3,067,279. As a result of the reinvention
efforts and foul air odor control studies conducted, staff identified the additional design
work that needed to be added to this job.
Amendment No. 4, which was approved in August 2000, increased the contract amount
$511,045 for a total PSA amount of$3,578,324. This additional work included design
services necessary to add another control building, retrofit controls, add effluent
monitoring equipment, install a pilot coagulation plant, provide CMMS work, and
miscellaneous rework.
Amendment No. 5, which was approved in May 2001, increased the contract amount
$24,783 for a total PSA amount of$3,603,107. This additional work included
engineering services necessary to bring the final design submittal up to current
standards and to provide design changes recommended by Staff.
Amendment No. 6, which was approved in February 2002, increased the contract
amount $1,602,797 for a total PSA amount of$5,205,904. This Amendment provided
construction support services for the designed project.
Amendment No. 7, which was approved in April, 2004, increased the contract amount
$992,957 for a total PSA amount of$6,198,861. This Amendment provided additional
construction support services for the designed project including startup services and
geotechnical engineering services.
Amendment No. 8
The construction duration has increased significantly due to staff requested changes,
design omissions, and unknown conditions since Amendments No. 6 and No. 7 were
approved and when construction support services were negotiated with the consultant.
Construction support services such as project management, on-site engineering,
submittal review, and RFI response will need to continue over a year more than what
was originally negotiated.
The total amount of the PSA, as well as the portion of this devoted to construction
support services inclusive of Amendment No. 8, is significantly below the anticipated
and budgeted cost for similar projects. The amended PSA is 9.4% of the current
construction contract. This is compared to 18% used as a budget guideline in the
Sanitation District Capital Improvement Program. Staff recommends approval of
Amendment No. 8, which provides for additional construction support services.
ALTERNATIVES
None.
n«1. wim Page 3
r
CEQA FINDINGS v
This project was included in the Strategic Plan EIR that was certified on October 27,
1999. A Notice of Determination was filed on October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Professional Services Agreement Status Report
3. Proposal Letter from Brown and Caldwell dated May 2, 2006
MP:el:bm:el:kf
H:1nl&Wfte da D1afi Repo"WDQP137AMndwM No.B.doc
a.w.e:aP1sm Page 4
BUDGET INFORMATION TABLE
Primary Clarifiers No. 16-31 and Related Facilities
Job No. P1-37
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED AUTHORIZATION TOTAL EXPENDITURE TO EXPENDED
BUDGET -BUDGET ` INCREASE BUDGET TO DATE REQUEST AUTHORIZATION DATE TO DATE(%)
Phase 1-Pro'ed Develc ment $ 173,000 - $ 173,000 $ 173,000 $ 173.000 $ 173,000 100%
Phase 2-Prelimina Design $ 317000 $ 317000 $ 317,000 r.! $ 317.000 S 317,000 100%
Phase 3-Desi n S 4,595.000 - S 4,595,000 $ 4.595,000 S 4.595.000 S 4.626.092 101%
Phase 4-Construction S 82,561738 $ 588,575 $ 83,150,313 �` S 82,516,962 S 5S8,S75; S 83.104.537 $ 76,411,998 92%
Phase 5-Coromissioning $ 396,000 $ 396,000 $ 39sD00 ,` $ 398,000 $ 115,812 29%
Phase 6-Closeout $ 61,oD0 1S 81,000 ` $ 61.000 a $ 61,000 S 11.787 19%
Phase 7-Confingency $ 1. 56,262 $- 688.57 $ 1,067.687 $
PROJECT TOTAL $ - $ 89,76— S - $ 89,760,000 1 $ 88,057,962 $ 588,575 $ 88S46,537 $ 81.655,689 92%
Reimbursable Costs
PROJECT NET 4 - S 89,760.000 S. - 3 89,760,000 3 85.057,962 1 S 588,575 $ 88646.537 $ 81,655,659 1 92%
PSA/Contract
LignPSA S 6.198561 $ 506.575 $ 6.787,436 1 $ 6,198.851 $.S_.- 588675 $ 6.787436 1$ 5.994.554 88%
Corlsbuction Conaad i$ 72676520 1 $ 72.676,520 S 72,676520 1 : S 72,676,520 1$ 66.083,086 91%
SOWS.003810499
Professional Services Agreement Status Report
Primary Clarifiers No. 16-31 and Related Facilities
Job No. P1-37
Total Project Budget: $89,760,533
Consultant: Brown and Caldwell
Start Date of Project: September 1998
Date Amendment Description Cost Accumulated
costs
9/23198 Original PSA Provide engineering services for 96-MGD Primary
Clarifiers and Related Facilities. $1 993,000 $1 993 000
1 Provide engineering services for: (1) rehabilitation of
existing primary clarifiers; (2)centralized sludge $863.185 $2,866,185
04/2a99 collection and transfer facilities(3) modification to
influent distribution structure; and (4) installation of
tricklin filter feed line.
Provide engineering services needed to conduct an
11/15/99 2 evaluation of high rate clarifiers as recommended by $21,557 $2,877,742
the Value Engineer.
Provide engineering design services necessary to
12/15/88 3 Improve odor control and automate the P1-33 clarifiers. $189,537 $3,067,279
Provide construction support services involved with
additional work added in Addenda Nos. 1-3.
0823/00 4
Provide engineering design services necessary to add
another control building, retrofit controls, and effluent $511,045 $3,578,324
monitoring, install a pilot coagulation plant, provide
CMMS work and miscellaneous re-work.
Provide engineering design services necessary to bring
07/02/01 5 the final design submittal up to current standards and to $24,783 $3,603,107
provide desi n chan es recommended by District staff.
8 Provide construction support services to support the
02/27/02 construction phase of the contract. $1,802,797 $5,205,904
04/28/04 7 Increase construction support services to support the $992.957 $6,198,861
construction phase of the contract.
Increase construction support services to support the
Pending 8 construction phase of the contract due to additional $588,575 $6,787,436
project delays of 313 days and additional RFls,
submittals, and Geotechnical Services.
EDMS'.003764622
Revised 05/14198
PDC COMMITTEE meenoaDate roea.aar.
07/O6/O6 07/19/O6
AGENDA REPORT Item Number Item Number
PDC06-71 13(1)
` Orange County Sanitation District
Collections
y- Facilities
FROM: David Ludwin, Director of Engineering
Originator: Martin Dix, Project Manager
SUBJECT: ROCKY POINT PUMP STATION REPLACEMENT, CONTRACT NO. 5-50
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the Conveyance, Disassembly and Abandonment
Agreement with the International Bay Clubs, Inc. regarding the existing Rocky Point
Pump Station, Contract No. 5-50, extending the abandonment deadline by three years.
SUMMARY
• The purpose of this project is to prepare the construction documents necessary to
complete the relocation of the Rocky Point Pump Station and to construct a new
facility that meets national and state codes, utilizing current Orange County
Sanitation District (Sanitation District) Design Guidelines. The project will include
the design of a new pump station and all appurtenances located on property
acquired from the International Bay Clubs, Incorporated (IBCI) by the Sanitation
District across the street from the existing station.
• In October 2004, after completing CEQA, the Sanitation District purchased the new
pump station property for$2,600,000. As part of the Purchase and Sale Agreement
with IBCI, the Sanitation District entered into a Conveyance, Disassembly and
Abandonment (CDA) Agreement that consented to abandon the existing Rocky
Point Pump Station by July, 2008 for the purpose of transferring the easement
occupied by the existing station to IBCI.
• The Sanitation District and IBCI have agreed to extend the deadline contained in
the CDA Agreement for three years. The attached Amendment No. 1 to the
Conveyance, Disassembly and Abandonment Agreement formalizes that extension.
This project has grown in size and complexity since originally envisioned, and a
new engineering firm has been selected to complete the work. This resulted in the
need for a time extension as further explained in "Additional Information".
PRIOR COMMITTEE/BOARD ACTIONS
On August 25, 2004 (Item 18d), the Board of Directors approved the Conveyance,
Disassembly and Abandonment Agreement between IBCI and the Sanitation District
regarding the existing Rocky Point Pump Station.
Page 1
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
❑ This item has been budgeted. (Line item: Fvos-w cia,section s.Page 22)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
The existing Rocky Point Pump Station is located at 1575 West Coast Highway in the
City of Newport Beach. The station lies within the boundaries of the Balboa Bay Club
(1221 West Coast Highway), adjacent to the Orange Coast College School of Sailing
and Seamanship (College). The station was built in the early 1940s for the City of
Newport Beach and later transferred over to the Sanitation District. The new
replacement station will be located on a four-parcel site, 1700 through 2000 West Coast
Highway, across the street from the College.
In 1999, the Sanitation District hired MacDonald Stevens Engineers to prepare an
assessment report on 17 pump stations throughout the service area. The report
entitled, Rehabilitation of Outlying Pump Stations, documented the deficiencies and
recommended modifications or relocation for each pump station. The report found
deficiencies related to the latest federal and state codes (e.g. seismic, electrical, safety),
and Sanitation District standards pertaining to operation and maintenance, safety and
spill prevention. Therefore, the Sanitation District is proposing to replace the station to
increase capacity, provide station reliability and personal safety, and reduce the
potential for sewage spills.
In March 2000, the Sanitation District entered into a Professional Service Agreement
(PSA) with Lee & Ro, Inc. for design and construction support services for the
replacement of the Rocky Point Pump Station. In October 2003, Lee & Ro, Inc.
performed a Site Study to investigate possible locations for the new station.
Lee & Ro, Inc. also supported the CEQA investigation, prepared a temporary flow
monitoring study, and performed a hydraulic analysis of the Newport Beach force main
network.
In October 2004, after completing CEQA, the Sanitation District purchased the above
referenced property for $2,600,000. During the negotiations for the property, the
Sanitation District entered into the CDA Agreement with IBCL IBCI wanted the existing
Rocky Point Pump Station easement returned to them for their purposes. The CDA
Agreement stipulated that the Sanitation District would abandon the existing pump
station and return the easement to IBCI by July, 2008.
In September 2005, Lee & Ro, Inc. was directed to stop work. Their remaining design
budget was not adequate to prepare the preliminary design report. Therefore, the
Sanitation District prepared and released a new Scope of Work that included many new
design elements that were not anticipated in the original Lee & Ro, Inc. Scope of Work
Page 2
authored in 1999 prior to selecting a site for the replacement station. The new Scope of
Work elements included: demolition of the existing on-site buildings (four buildings),
CEQA mitigation measures (i.e., gas collection and treatment, geologic✓geotechnical
mitigation, preparation of traffic control plan, etc.), modifications to the existing gravity
sewers and force mains in West Coast Highway, community outreach, building
architecture compatible with the "Mariner's Mile Strategic Vision and Design
Framework," and coordination of a potential joint project with the neighboring college.
Coordination with the College resulted from joint discussions concerning the College's
need to expand their existing School of Sailing and Seamanship's vocational program
located directly across Coast Highway at 1801 West Coast Highway. Expansion is
desirable for the College since their existing facility lacks adequate parking and
classroom space to accommodate future enrollment. A joint project could solve the
College's land shortage and benefit the Sanitation District monetarily through the sale,
lease, or transfer of the excess land (only a portion of the site is being utilized for the
future pump station leaving a significant portion of the property available for other uses).
In an effort to achieve the multiple public benefits represented by both projects, the
Sanitation District and College staff drafted the terms of a joint project agreement
Memorandum of Understanding (MOU). Essentially, the MOU states that both agencies
will cooperate in efforts to build their respective projects for the greater benefit of the
public. If the MOU project proves feasible, the Sanitation District would build its
replacement pump station while the College would build a new school expansion;
together both projects represent a greater good to the communities they serve. In
December 2005, the Sanitation District Board of Directors approved the MOU and
authorized the General Manager to negotiate with the College concerning the sale,
lease, or transfer and eventual use of the unused portion of the Rocky Point Pump
Station property at 1700-2000 West Coast Highway.
Because of CEQA mitigation requirements and additional Scope of Work elements that
were necessary and not part of the original project, it became apparent that the CDA
Agreement deadline could not be met. The Amendment to the CDA Agreement would
provide additional time to pursue these objectives and planning needs.
ALTERNATIVES
N/A
CEQA FINDINGS
In August 2004, the Sanitation District's Board of Directors certified the Final
Environmental Impact Report implementing the Rocky Point Pump Station Replacement
Project, Contract No. 5-50; Making certain findings relating to environmental effects
identified in the Final Environmental Impact Report; and, adopting a Mitigation
Monitoring and Reporting Program. This Amendment would not alter the proposed
project nor its physical impact on the environment.
ATTACHMENT
None
MD:kf:eh
H:Ntglobe0rlgenoa Draft RepertslPM5.60 Rocky Point Pump Station.00c
Page 3
PDC COMMITTEE Meeting Date To ad.of Db.
07/06/06 07/19/06
AGENDA REPORT Item Number Item Number
PDC06-72 13(k)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Ann Tobin, Engineer
SUBJECT: COOPERATIVE PROJECTS GRANT PROGRAM, JOB NO. J-73
GENERAL MANAGER'S RECOMMENDATION
Approve grant funding for the following Cooperative Projects: (1) $300,000 for Garden
Grove Sanitary District for Closed Circuit Television (CCTV) inspection and sewer
condition assessment; and (2) $325,000 for the City of Cypress for CCTV inspection
and sewer condition assessment, for a total of$625,000.
SUMMARY
• The Garden Grove Sanitary District requests a grant for$300,000 for CCTV
inspection and sewer condition assessment. The application was received April 6,
2006. The project is expected to be completed in fiscal year 2007-2008.
• The City of Cypress requests a grant for $325,000 for CCTV inspection and sewer
condition assessment. The application was received April 6, 2006. The project is
expected to be completed in fiscal year 2007-2008.
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
Once awarded, Cooperative Projects Grants are paid to local agencies on a
reimbursement basis after project completion. The total amount of grant
reimbursements provided to member agencies since 1999 through the program is
approximately $13.1 million.
Capital grants to member agencies are currently included as an item in the Orange
County Sanitation District's (Sanitation District) Joint Operating budget. There are 17
outstanding contract agreements and a total of approximately $4.6 million in grant
authorizations for ongoing cooperative projects.
The new projects would increase outstanding obligations to approximately
$5.2 million. Reimbursements for the new projects are anticipated to be paid out during
FY 2007-08 and would increase the 2007-08 projected pay out to approximately $2.3
million.
H.beplNpmNY!aaOAgmM Reµ IP3C08 BOBrO Apanm 8 Apwdv RepalaW)L6\Ilan I]h)J]]bx
RuvneC o,malos Page 1
BUDGETIMPACT
® This item has been budgeted. (Line item: 05/06 - Section 5, pages 1 and 4)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The Cooperative Projects Grant Program (Program) was initiated in 1998 to delay or
eliminate the need to construct additional treatment and disposal facilities resulting from
increasing amounts of Rain Dependent Infiltration and Inflow (RDII). Infiltration/Inflow
(1/1) is storm and/or groundwater that enters the sewer system through cracked pipes,
leaky manholes, or improperly connected storm drains, down spouts, and sump pumps.
Most inflow comes from storm water and most infiltration comes from groundwater. The
primary purpose of the Program is to improve local sewer systems in order to achieve a
20% reduction in the RDII contribution to the Sanitation District's peak wet weather
flows by the year 2020. The peak wet weather flow rate at the Sanitation District's
treatment plants is more than double the average daily flow rate. Increasing 1/1
associated with aging sewer pipes in the Sanitation District's service area was identified
as largely responsible for the increase in wet weather flow. The rising rate of 1/1
increased the Sanitation District's peak wet weather flow rate from 1.7 times the
average flow in the 1970's to more than 2.0 times the average flow in 1995. Without a
program to control 1/1, the Sanitation District will continue to see higher peak flows.
Since 1999, the Sanitation District has solicited project applications from local agencies
for Cooperative Projects grants. (The Sanitation District did not solicit applications
during FY 03-04 and 05-06 to allow time to track delayed projects, to process
reimbursement requests, and to analyze wet weather data.) Agencies have submitted
applications for matching funds for local sewer system investigations and rehabilitation.
To rank the applications, the Sanitation District staff prepared a payback analysis for
each proposed project. Key areas for effective 1/1 reduction have been identified based
on the Sanitation District flow monitoring data. Proposed projects have generally been
ranked based on payback period (cost of project/savings per year from reduced 1/1),
type of funding request, environmental benefits, nature of project, and any other
overriding considerations. Examples of overriding considerations are potential beach
closures caused by leakage from sewers; potential subsurface leakage or potential
sanitary sewer overflows (SSO). Once approved, contracts are drawn up to define the
Scope of Work, schedule, budget, and requirements.
The Garden Grove Sanitary District (GGSD) requests $300,000 to inspect and assess
400,000 feet of sewer. The information will be incorporated into GGSD's 1/1 reduction
and capital improvement plans.
The total cost of the work, including the inspections, review of the reports and
recordings, and plan updates is estimated to be $600,000. The cost of CCTV
inspection is estimated at $416,600.
H1.111e^4a�BmE P,nO.Fe�Bead Ap.ft INkI}73 yp�
A... D11W1. Page
? The City of Cypress requests $325,000 to inspect and assess 450,000 feet of sewer.
The information will be incorporated into the City of Cypress 1/1 reduction plan and
capital improvement program. The total cost of the work, including the inspections,
review of the reports and recordings, and planning updates is estimated to be $650,000.
The cost of CCTV inspection is estimated at $466,400.
Since there was no quorum at the May 10, 2006 Cooperative Projects Grant Committee,
this action item concerning grant requests has been referred directly to the Planning,
Design, and Construction Committee.
The Cooperative Projects Grant Committee, formerly an ad hoc committee, will become
a special committee. Beginning in July 2006, the Committee will meet quarterly to
review grant requests on an ongoing basis.
ALTERNATIVES
No alternatives are recommended.
CEQA FINDINGS
Local agencies are responsible for CEQA compliance.
ATTACHMENTS
None
AT:sa
KWglobaKAgenda Draft RepodSXPDCU-I3-AR-07000SAW
H'.WepIWg� da9°^'L nepa,le�3006Bmtl Aga IMW.aepa Wffi.131k1}]3.E
aaWaea'. oim= Page 3
' PDC COMMITTEE MeeIng Date To ad.of Dir.
f 07/06/06 07/19/06
AGENDA REPORT Item Number Item Numbe
PDC06-73 13f11
Orange County Sanitation District
Dig scion& Handling
8 lids
FROM: David Ludwin, Director of Engineering
Originator: Kathy Millea, CIP Project Manager
SUBJECT: EMERGENCY REPAIR OF SOLIDS STORAGE AND TRUCK LOADING
FACILITY AT PLANT NO. 2, JOB NO. P2-60
GENERAL MANAGER'S RECOMMENDATION
Ratify use of the General Manager's emergency purchasing authority, Resolution
No. OCSD 99-23, for Purchase Order Nos. 50018-OS, 52747-OS, 53411-OS, and
55070-OS issued to Frost Company for a total amount not to exceed $224,000 for
emergency repairs to the critical process equipment installed in the Solids Storage and
Truck Loading Facility, Job No. 132-60.
SUMMARY
• Due to Contractor bankruptcy, the bonding company, Travelers Casualty and Surety
Company of America (Travelers), has taken responsibility for the completion of Job
No. P2-60. In February 2005, the majority of the construction was completed and
the one year warranty period commenced.
• The critical facility experienced numerous failures during the warranty period.
Travelers has rejected the Orange County Sanitation District's (Sanitation District)
claim of Contractor responsibility for these failures, and has refused to correct the
problems. As a result, the Sanitation District has not accepted the project as
.,complete". In order to keep the facility operational and safe, the Sanitation District
General Counsel's Office recommended that the Sanitation District make all
necessary repairs, following notification to Travelers of the intent to recover repair
costs.
• Staff has authorized four purchase orders for emergency work on Job No. P2-60.
Section 3.09 of the Delegation of Authority states that only emergency actions
greater than $100,000 need to be approved by the Chair or Vice Chair; Emergency
actions less than $100,000 are reported to the FAHR Committee. While no
individual purchase order has been greater than $100,000, nor has the total amount
paid to date exceeded $100,000, staff is anticipating the total amount of all the
emergency work on Job No. P2-60 to exceed $100,000. TO comply with the
Delegation of Authority, staff is requesting ratification of a total not to exceed amount
of$224,000 for all necessary emergency services to repair critical and unsafe
process equipment on Job No. P2-60.
Page 1
PRIOR COMMITTEEIBOARD ACTIONS
r
Since June 2003, when the Contractor filed Chapter 11 bankruptcy, the Director of
Engineering has kept the PDC apprised of the major issues regarding Job No. 132-60.
In addition, the Sanitation District's Legal Counsel has addressed this project in closed
sessions of the PDC meetings in February 2006 and June 2006, as well as in closed
session of the Board meeting in June 2006. The individual Purchase Orders have been
reported to the FAHR Committee in the regular reporting cycles.
PROJECT/CONTRACT COST SUMMARY
The emergency repair was not budgeted and is an unanticipated expense. The
Sanitation District will be seeking reimbursement of these expenses from Travelers.
BUDGETIMPACT
❑ This item has been budgeted. (Line item: FY 06/07 Budget Book,Page 61)
❑ This item has been budgeted, but there are insufficient funds.
® This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Job No. P2-60 provided the construction of a new biosolids storage and truck loading
facility at Plant No. 2. The new facility transports biosolids from the existing dewatering
building to two new biosolids storage silos. The storage silos are connected to truck
loading bays, where truck haulers load biosolids for offsite transport.
Carollo Engineers prepared the plans and specifications for Job No. P2-60, and the
contract was awarded to JW Contracting Corporation in May 2000. In June 2003,
JW Contracting Corporation filed Chapter 11 bankruptcy. In November 2003, the State
Bankruptcy Court directed Travelers to complete construction of Job No. P2-60. By
February 2005, Travelers completed the majority of the project requirements and the
operation of the facility was transferred to the Sanitation District. The one year warranty
period began in February 2005.
The facility experienced numerous and potentially dangerous failures during the
warranty period. As Travelers would not repair the failures, the Sanitation District
issued four emergency repair purchase orders to Frost Company between the months
of May 2005 and May 2006. These purchase orders were issued to perform separate
repairs to the pumping systems installed under Job No. P2-60. While the amount spent
to date on these four purchase orders is under $100,000, the limit for the General
Manager's authorization of emergency work, the cumulative amount exceeds $100,000.
To comply with the Delegation of Authority, staff is requesting ratification of a total not to
exceed amount of$224,000 for all necessary emergency services to repair critical and
unsafe process equipment on Job No. P2-60. The Sanitation District will be seeking
reimbursement of these expenses from Travelers.
In November 2005, Travelers filed a California Government Code Claim against the
Sanitation District in excess of$5,300,000. In closed sessions of the PDC meetings on
Page 2
February 2006 and June 2006, as well as the closed session of the June 2006 Board
meeting, the Sanitation District General Counsel's Office reported on the status of Job
No. P2-60.
Summary of the Four Emergency Repair Service Agreements
In May 2005, the Sanitation District issued an Emergency Repair Sole Source Service
Agreement (Purchase Order No. 50018-OS) in an amount not to exceed $36,000 to
Frost Company. The repair work included providing materials and labor to repair two of
the four biosolids cake transfer pumps that had failed during the one year warranty
period.
In November 2005, the Sanitation District issued an Emergency Repair Sale Source
Service Agreement (Purchase Order No. 52747-OS) in an amount not to exceed
$50,000 to Frost Company. The repair work included providing materials and labor to
repair several hydraulic oil lines that had failed during the warranty period. The leaking
high pressure lines rendered two of the four cake transfer pumps inoperable. As a
result, there were no operable stand-by pumps, placing the Sanitation District at an
unacceptable level of risk.
In January 2006, the Sanitation District issued an Emergency Repair Sole Source
Service Agreement (Purchase Order No. 53411-OS) in an amount not to exceed
$43,000 to Frost Company. The work consisted of providing materials and labor to
replace failed high pressure oil lines on Cake Transfer Pump No. 4. The leaking high
pressure lines rendered Cake Transfer Pump No. 4 inoperable, and posed a serious
safety risk.
In May 2006, the Sanitation District issued an Emergency Repair Sole Source Service
Agreement (Purchase Order No. 55070-OS) in an amount not to exceed $95,000 to
Frost Company. The work included providing materials and labor to replace the larger
hydraulic oil lines on Cake Transfer Pumps Nos. 1, 2, and 3. The work was necessary
to correct deficient construction on the high pressure oil lines which would, upon
predicted failure, render the pumps inoperable, as well as pose a serious safety risk.
Current Expenditures to Date
FROST INVOICES
PjW Date Issued Current = total'''- Remarmng`:
P:O Value "Pafdko Date Balance ^50018-OS 5/18/05 $36,000.00 $21,461.25 $14,538.753
52747-OS 11/21/05 $50,000.00 $34,122.83 $15,877.17
53411-OS 1/17106 $43,000.00 $42,961.57 38.43
55070-OS 5/09/06 $95,000.00 0.00 $95,000.00
Total $224,000.00 $98,546.65 $125,454.35
ALTERNATIVES
No alternatives are proposed.
Page 3
CEQA FINDINGS
Not required
ATTACHMENTS
None
CH:dm:kf:eh
H:4tlgiobaMgenda Draft aep�wDcwzso AR Emergency POs 0706M.dm
Page 4
PDC COMMITTEE Meeting Date TO
Bd or dr.
07/06/06 07/19/06
d AGENDA REPORT nem Number Item Number
y PDC06-74 13(m)
Orange County Sanitation District
Facilities
FROM: David Ludwin, Director of Engineering
Originator: David May, IPMC Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION, JOB NO. 1-2-4
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 19 to Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, with
Steve P. Rados, Inc., authorizing a credit of$4,358,204, decreasing the total contract
amount to $30,528,502.
SUMMARY
• Job No. 1-2-4, Bushard Trunk Sewer Rehabilitation, includes the installation of
21,600 linear feet Oust over four miles) of 108-inch reinforced concrete pipe,
manholes, junction structures, and miscellaneous utility relocations.
• Boyle Engineering Corporation prepared the plans and specifications and the
contract was awarded to Steve P. Rados, Inc. (SPR) on June 26, 2002.
• Scope changes and timing constraints required modification of Job No. 1-2-4 to
include new Job No. 1-24A, the work in the Ellis-Bushard Intersection.
• The Mediation Settlement Agreement required further modification of Job No. 1-2-4
to include new Job No. 1-24P, the fabrication and delivery of 108-inch and
96-inch pipe.
• Change Order No. 19 includes one item of deleted work. There are no reimbursable
or non-reimbursable design errors associated with this change order. Liquidated
damages on this contract are $2,000 per calendar day and the bonus provisions are
$750 per calendar day. The contract is now 47% complete.
PRIOR COMMITTEEIBOARD ACTIONS
The contract was awarded by the Board of Directors on June 26, 2002. Please refer to
the attached Change Order Status Report for information on all previous change orders.
Page 1
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 30,003,210
Previously Authorized Changes $ 4,883,496
This Change Order (CO No. 19, Deduct) $ (4,358,204)
Change Orders to Date $ 525,292
Percent Increase to Date 1.75%
Amended Contract Price $ 30,528,502
BUDGETIMPACT
® This item has been budgeted. (Line item: FY 05/06 Budget Book, Page 847)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Contract Schedule
Contract Start Date September 16, 2002
Original Contract Completion Date March 18, 2004
Total Number of Change Orders to Date 19
Current Contract Completion Date Deferred
Actual Completion Date N/A
Days Subject to Liquidated Damages N/A
Chance Order No. 19 Content
Item No. Description Amount DaysT e
1 Credit for108-Inch Pie $4,358,204 0 Other
Total $4,358,204 0
Item 1 is a credit for the manufacturing and delivery cost of the remaining 108-inch
reinforced concrete pipe that would have been provided by the Contractor.
When installation of the project pipe and related materials began in March 2003, the
Contractor encountered problems and delays. The problems and delays were mainly
associated with the 108-inch reinforced concrete pipe. The Sanitation District, the
Contractor, and the pipe supplier disagreed about the causes of and responsibilities for
the problems and delays. The parties entered into a Mediation Settlement Agreement
on August 1, 2005. Item 1.3.1 of the Agreement species that the Sanitation District will
furnish and deliver to the jobsite new 108-inch pipe required to complete the project.
And Item 1.8 of the Agreement specifies that the Sanitation District shall be entitled to a
credit in an amount the Contractor would have paid to Rinker for the purchase and
delivery of the remaining original pipe.
Page 2
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program EIR certified on
October 27, 1999. A Notice of Determination was filed on October 29, 1999.
Additional CEQA documentation for the project was included in Addendum No. 3 to the
EIR approved on December 19, 2001. Addendum No. 8 to the program EIR was
certified at the February 2006 Board meeting. These Addenda do not change CEQA
findings.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order Performance Report
4. Change Order
MB:DM:dm
HAn19lobaWenda Draft Reporls'PDCV-24AR CO 019070606.dx
Page 3
BUDGET INFORMATION TABLE
Bushard Trunk Sewer Rehabilitation
JOB NO. 1-2-4, CO#19
ORIGINAL CUR PROPOSED
RENT PROPOSED FUNDS THIS ESTIMATED ESTIMATED
BUDGET
PROJEOTIPHA9E AUTHORIZED PROJECT REVISED AUTHORIZED TO AUTHORIZATION PROPOSED TOTALEXPENDITURE EXPENDED TO
IDECRFASE
BUDGET ' BUDGET INCREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
-
Phase l-Project Osv prhent S 74,000 S 74aW S 74000 5 74000 3 74,000 E 74,649 101%
Mesa 2-PreSmina Design E 10aW $ 10.000 3 10000 6 10,000 6 10,000 6 9,148 01%
Mesa 3-De n $ 2,168,000 8 2168,000 $ 2168,000 3 2168.000 $ 2.108000 3 2.175812 100%
Phew 4-ComWetlon S 48.142.000 E 58328948 3 4368A04 E 53,968,744 ; E 54.119002 $ 4358,200 3 49.790798 S 28.001405 62%
Phew 5-Calsolow.,in S 418.000 E 416.000 S 416,000 $ 328.000 S 326.000 S 251.500 77%
Phew 6-Clore40u1 3 72000 S 72.000 3 72,000 S now S 40.000 3 1.657 4%
Phase 7-Confimemy $ 2698000 S 2.513052 S /368.204 S 6.671266 S 2.698000 E 2,696000 0%
PROJECTTOTAL S 53.580,000 $ 63,680,000 S - S 63,580,000 8 w,4M,002 b 4,358,204 8 68.0767w S 28,594,180 52%
Raimburwbb Coals I I I I I I I S 10T95)
PRWECT NET $ 53.580,000 1 $ 03,500.000 1 E - S 63,580.000 1 1 S 59,435.002 1 3 4.388,Z06 S 55.076,798 S 28.654.975 52%
PSA7CBntwct
PDSA-B le S $46300 3 2467A25 3 2.467.825 S 2,487525 S 2467626 $ 2188745 58%
PDSA-Eanh Tech S 2,000000 6 2052,503 3 2,D52.593 3 2.052.593 E 2,052.593 S 0%
PDSA-Malcolm Pimia $ - S 223,045 3 223,046 $ 223.045 $ 223,045 S 79,267 w%
PDSA-Amen Grover S - E 163.000 S 153,000 S 163000 3 15A000 S 88.000 58%
Coolract 1.2.4P-Amemn E - $ 7.11M,726 S 7854725 S 7864,725 $ Z884725 $ a%
1.2.4 Contmcl-Rados E 300032f0 3 345w,]w 3 036820,1 S 30528S02 S 34866706 6 d35A,204 S 30.638,502 S 19,721272 65%
I-24A Conlrecl-Bubeb E 10000.000 S 11101.500 S 11,191,500 E 11181300 E 1L19L500 S 0%
30Whem Cal6ami8 Edison S - 3 350000 E 980.000 3 350000 S 360.000 9 0%
EDMS MON743
CHANGE ORDER STATUS REPORT
BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4 CO#19
ITEM APPROVAL DATE
CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME COST TO DATE INCREASE TIME TO DATE
(DAYS) (DAYS)
CONTRACT June 26, 2002 $30,003.210 $30,003,210 550 550
CO NO. 1' ApH123, 2003 $150,000 $30,153,210 0.50% 0 550
CO NO.2 June 25.2003 $107,724 $30,260,934 0.88% 2 552
CO NO.3 October 22, 2003 $44,293 $30,306,227 1.01% 1 553
CO NO.4 February 25,2004 $380,251 $30,685,478 2.27% 0 553
CO NO. 5 March 24, 2004 $409,301 $31.094,779 3.64% 0 553
CO NO.6 May,26,201341 $27,612 $31,122,391 3.73% 5 558
CO NO.7 June 23.2004 $163,618 $31.286,009 4.28% 0 558
CO NO.8 July 21,2004 $230,317 $31.516.326 5.04% 0 558
CO NO.9 September 22,2004 $153,119 $31,669,445 5.55% 0 558
CO NO. 10 November 17,20D4 $242,360 $31,911,805 6.36% 0 558
CO NO. 11 December 15,2004 $0 $31,911,805 6.36% 49 607
CO NO. 12 December 15,2004 $0 $31,911.805 6.36% 27 634
CO NO. 13 February 23,20D4 $225,331 $32,137,136 7.11% 7 641
CO NO. 14 March 23,2005 $98,750 $32,235,886 7.44% 0 641
CO NO. 15 June 22,2005 $28.253 $32.264,139 7.54% 0 641
CO NO. 16" August 22,2005 $3.422,266.80 $35,686,405.80 18.94% 0 641
CO NO. 17 October 26,2005 $23,707.00 $35,710,112.80 19.02% 0 641
CO NO. 18 February 22,2006 $823,407.00 $34,886,705.80 16.28% 0 641
C[5 N0.19 .Pending $4,358,204.00 "$30,526 601.BD 1.75% 0 - NIA"'
'Approved by PDC Committee per delegated authority by Board Resolution 99-23
"Approved by General Manager pursuant to Settlement Agreement and Release effective 8/1/05
—Authorized Time to Date has changed and will be modified in a future change order per terms of the Settlement Agreement and Release
EDMS 003509745
. a
CHANGE ORDER PERFORMANCE REPORT
BUSHARD TRUNK SEWER REHABILITATION
JOB NO.1.24,CHANGE ORDER N0.19
Contractor STEVE P.RADOS Project Category:COLLECTIONS
Design Consultant BOY E ENGINEERING Contact%Complete:47% Orginal Contract Pnce: 53g003310
CHANGE ORDER TYPES TACKED INFORMATION ONLY
RelmW..m.Design N9Mieknbwn SuatOtm LO Types
Unknown Conalllon Stan ReRuened Change Eno. Damp.Eno. Tracked' mher TOW
Change Onlem SO 0.00% SD 0.00% g0 0.00% SO e.00% SO 0.00%j$46.11�2�11,4 ($,I. 58.204) -14.53%
this PeNagChange 0r6Bman $$69R93 2.90% S1,DOD.992 3.60% $0 D00% 60,44%446 11.4T% $5.391,331 1T.97% % $4.8a3,495 16.28%
DataChangeOH rTolal $869.893 2,90% 51,080.992 3.60% U."D.446 11A7% $6,391.331 17,9T% % $525,292 1.75%
Program 3.00X <1.00% 0.00% <1.00% <6.00%
Performance Goals
T c".Omv Mao scent Plan 0eeJa the p.mahq WtllageoNmypm
Version WIn006
vxosommatt$
Page 1 of 3
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Nineteen(19)
Date: July 19, 2006
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineerino Corporation
Amount of this Change Order (Add)(Deduct) $(4.358.204.00)
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
Item 1 — CREDIT FOR 108-INCH PIPE
This item is for a credit for the manufacturing and delivery costs of the original Rinker
108-inch pipe that still needed to be installed to complete the project at the effective date of the
Tolling and Mediation Agreement, January 1, 2005. Item 1.8 of the final Settlement Agreement and
Release(Agreement) specifies that the Sanitation District shall be entitled to a credit in an amount the
Contractor would have paid to Rinker for the purchase and delivery of the remaining original pipe.
This credit was specked because the Sanitation District, as part of the Agreement, is providing new
pipe for Contractor installation. The credit is for a total of 13,302.38 linear feet of 108-inch pipe, at a
unit price of$335.27 per linear fool, less$101,685. The$101,685 reduction accounts for an
adjustment that was made to Bid Item No. 12,which was a bid time credit applied proportionally to all
bid items on each progress payment. Since the value and quantity of Bid Item No. 2.2 is being
reduced, Bid Item No. 12 is also proportionally reduced. The Sanitation District will take credits in
each future progress payment proportionally to the installation quantities of the new pipe. Nothing in
this change order modes or waives any terms, rights or obligations contained in the Settlement
Agreement and Release.
CREDIT THIS CHANGE ORDER ITEM: $(4,358,204.00)
11ME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL CREDIT THIS CHANGE ORDER: $(4,358,204.00)
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 2 of 3
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Nineteen (19)
Date: July 19 2006
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Enaineerma Corporation
The additional work contained within this change order can be performed incidental to the prime work
and within the time allotted for the original contract and any extensions to the contract time made by
this change order and all previously issued change orders. It is therefore mutually agreed that no
extension of time to perform the work is required for this change order, and that no direct or indirect,
incidental or consequential costs, expenses, losses or damages have been or will be incurred by the
Contractor, except as expressly granted and approved by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Date: September 16, 2002
Original Contract Time: 550 Calendar Days
Original Completion Date: March 18, 2004
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: Deferred
Revised Contract Time: Deferred
Revised Final Completion Due Date: Deferred
Time Subject to Liquidated Damages: NIA
Actual Final Completion Date: NIA
Original Contract Price $30,003,210.00
Prev. Authorized Changes $ 4,883,496.00
This Change (Add) (Deduct) $ (4,358,204.00)
Amended Contract Price $30,528,502.00
oy
Page 3 of 3
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Nineteen (19)
Date: July 19, 2006
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Enaineerina Corporation
Board Authorization Date: July 19, 2006
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Tod E. Haynes, P.E. Date
Engineering and Construction Manager
Approved by:
David A. Ludwin, P.E. Date
Director of Engineering
Accepted by:
Steve P. Rados, Inc.
Contractor Date
EDMS0 MM747
MINUTES OF THE JOINT MEETING OF THE
FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE & STEERING COMMITTEE
SPECIAL MEETING—BENEFITS WORKSHOP
Orange County Sanitation District
Wednesday,June 15,2006, 5:00 p.m.
A joint meeting of the Finance,Administration and Human Resources Committee and the
Steering Committee of the Orange County Sanitation District was held on June 15, 2006, at
5:00 p.m., in the Sanitation District's Administrative Office.
(2) The roll was called and a quorum declared present,as follows:
FAHR COMMITTEE MEMBERS: STAFF PRESENT:
DIRECTORS PRESENT: Jim Ruth, Interim General Manager
Darryl Miller, Chair Lorenzo Tyner, Director of Finance
Mike Duvall,Vice Chair Mike White, Controller
Bill Dalton Jeff Reed, Human Resources Manager
Rich Freschi Rich Spencer, Human Resources Supervisor
Phil Luebben Paul Loehr, Human Resources Supervisor
Joy Neugebauer Kim Erickson, Human Resources Analyst
Mark Waldman Penny Kyle, Committee Secretary
Jim Ferryman, Vice Board Chair
James W. Silva
OTHERS PRESENT:
DIRECTORS ABSENT: Brad Hogin, General Counsel
Steve Anderson, Board Chair Keith Bozart
Ryal Wheeler
(3) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(4) PUBLIC COMMENTS
There were no public comments.
(5) a. ARBA Update
Paul Loehr, Human Resources Supervisor, described the efforts underway by
OCERS to establish a medical investment trust. He also reported staff was
reviewing an actuarial report on ARBA.
Minutes of the Regular Joint meeting of the Finance, Administration and Human I
Resources Committee and Steering Committee Meeting
June 15, 2006
Page 2
b. OCSD Retirement Program Overview
Staff provided an overview of the retirement program which included detailed
infonnation on individual components such as formulas,final average salary,
maximum benefit limits, replacement benefits plan, and eligibility.
Keith Bozart, OCERS Representative, provided information on the actuarial study
that was done on the overall OCERS program. He also discussed the County of
Orange's evaluation to move to CAL-PERS vs. remaining with OCERS.
(6) CLOSED SESSION
The Committee convened in Closed Session at 6:40 p.m. pursuant to Government Code Section
54957.6 to confer with designated representatives Lisa Tomko, Director of Human Resources;
Jeff Reed, Human Resources Manager; and Rich Spencer, Human Resources Supervisor, re
Meet and Confer Update re contract negotiations for employees represented by 1). Orange
County Employees Association;2). International Union of Operating Engineers, Local 501, and
3). Supervisors, Professional Management Team (part of Peace Officers Council of California),
Government Code Section 54957.6. Confidential Minutes of the Closed Session held by the
Finance,Administration and Human Resources Committee have been prepared in accordance
with California Government Code Section 54957.2, and are maintained by the Board Secretary
In the Official Book of Confidential Minutes of Board and Committee Closed Meetings. No
reportable actions were taken re Agenda Item No. 6(a).
RECONVENE IN REGULAR SESSION: At 7:05 p.m., the Committee reconvened in regular
session.
(7) ADJOURNMENT
The Chair declared the meeting adjourned at 7:05 p.m.
Submitted
'by: �Q
�f/d� '�f
Penny M. We
Committee Secre ry
OFilw-l�ocs Weptag"&%FAHRWAHRY0061061606 Benefits Workshop1061506 Benefits WOMMop Mlnets6.doc
MINUTES OF THE JOINT MEETING OF THE
FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE & STEERING COMMITTEE
SPECIAL MEETING—BENEFITS WORKSHOP
Orange County Sanitation District
Wednesday,June 15, 2006, 5:00 p.m.
A joint meeting of the Finance, Administration and Human Resources Committee and the
Steering Committee of the Orange County Sanitation District was held on June 15, 2006, at
5:00 p.m., in the Sanitation Districts Administrative Office.
(2) The roll was called and a quorum declared present, as follows:
FAHR COMMITTEE MEMBERS: STAFF PRESENT:
DIRECTORS PRESENT: Jim Ruth, Interim General Manager
Darryl Miller, Chair Lorenzo Tyner, Director of Finance
Mike Duvall,Vice Chair Mike White, Controller
Bill Dalton Jeff Reed, Human Resources Manager
Rich Freschi Rich Spencer, Human Resources Supervisor
Phil Luebben Paul Loehr, Human Resources Supervisor
Joy Neugebauer Kim Erickson, Human Resources Analyst
Mark Waldman Penny Kyle, Committee Secretary
Jim Ferryman,Vice Board Chair
James W. Silva
OTHERS PRESENT:
DIRECTORS ABSENT: Brad Hogin, General Counsel
Steve Anderson, Board Chair Keith Bozart
Ryal Wheeler
(3) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(4) PUBLIC COMMENTS
There were no public comments.
(5) a. ARBA Uodate
Paul Loehr, Human Resources Supervisor,described the efforts underway by
OCERS to establish a medical investment trust. He also discussed staff was reviewing an
actuarial report on ARBA.
b. OCSD Retirement Program Overview
Staff provided an overview of the retirement program which included detailed
information on individual components such as formulas,final average salary, maximum benefit
Minutes of the Regular Joint meeting of the Finance, Administration and Human
Resources Committee and Steering Committee Meeting
June 15, 2006
Page 2
limits, replacement benefits plan, and eligibility.
Keith Bozart, OCERS Representative, also provided information on the actuarial study that was
done on the overall OCERS program. He also discussed the County of Orange's evaluation to
move to CAL-PERS vs. remaining with OCERS.
(6) CLOSED SESSION
The Committee convened in Closed Session at 6:40 p.m. pursuant to Government Code Section
54957.6 to confer with designated representatives Lisa Tomko, Director of Human Resources;
Jeff Reed, Human Resources Manager; and Rich Spencer, Human Resources Supervisor, re
Meet and Confer Update re contract negotiations for employees represented by 1). Orange
County Employees Association; 2). International Union of Operating Engineers, Local 501, and
3). Supervisors, Professional Management Team (part of Peace Officers Council of California),
Government Code Section 54957.6. Confidential Minutes of the Closed Session held by the
Finance, Administration and Human Resources Committee have been prepared in accordance
with California Government Code Section 54957.2, and are maintained by the Board Secretary
in the Official Book of Confidential Minutes of Board and Committee Closed Meetings. No
reportable actions were taken re Agenda Item No. 6(a).
RECONVENE IN REGULAR SESSION: At 7:05 p.m., the Committee reconvened in regular
session.
(7) ADJOURNMENT
The Chair declared the meeting adjourned at 7:05 p.m.
Submitted by:
A� l
Penny M. Kyld
Committee Secretary
\\Filer-0bcsdldept\agenda\FAHR\FAHR2006\061506 Benefits Workshop\061506 Benefits Workshop Minutes.doc
FAHR COMMITTEE meeting Dare I To Bd.of Dlr.
07/12/06 07/19/06
AGENDA REPORT Ieern mornber Item rvumber
F70---2 14fb1
Orange County Sanitation District
FROM: Lorenzo Tyner, Director of Financelfreasurer
Originator: Michael D. White, Controller
SUBJECT: ANNUAL REVIEW AND ADOPTION OF THE DISTRICTS INVESTMENT
POLICY STATEMENT AND DELEGATION OF INVESTMENT
AUTHORITY TO THE DIRECTOR OF FINANCE/TREASURER
GENERAL MANAGER'S RECOMMENDATION
Adopt Resolution No. OCSD 06-17, Authorizing the District's Treasurer to Invest and/or
Reinvest District's Funds; Adopting District's Investment Policy Statement and
Performance Benchmarks for FY 2006-07; and Repealing Resolution No. OCSD 05-21.
SUMMARY
This agenda item presents the annual review of the District's Investment Policy
Statement to the Finance, Administration and Human Resources Committee (FAHR) for
consideration in the Committee's capacity as the oversight committee for the Investment
Policy (Section 16.2). With adoption of the attached Resolution, the Board of Directors
would readopt the District's current Investment Policy Statement, portfolio performance
benchmarks, and monitoring and reporting requirements for FY 2006-07.
The Districrs Investment Policy Statement is recommended for adoption for FY 2006-07
that includes a revision that matches the legislative changes made to the State
Government Code since the adoption of the FY 2005-06 Investment Policy.
The District's FY 2006-07 Investment Policy Statement is recommended for adoption
with only one minor change from FY 2005-06 as a result of a change in the State
Government Code. Section 53601 of the State Government Code has reduced the
maximum percentage rate that the portfolio may be invested in commercial paper (An
unsecured, short-term debt instrument issued by a corporation) from 30 percent to 25
percent, so long as the average maturity of all commercial paper in the portfolio does not
exceed 31 days. Accordingly, staff has revised Sections 8.3 and 11.6 of the District's
Investment Policy Statement to reflect this legislative restriction.
Staff will continue to monitor pending legislative and regulatory proposals in the public
finance area for their potential impact on the District's existing financial programs.
The District's Investment Policy Statement has received the Investment Policy
Certification of Excellence Award from the Municipal Treasurer's Association of the
United States and Canada.
N YNpVgwW`Bora nperge PepwraV006 Boa,e agenma rypmc nepmslt]OBv,m,alel lmaLmem vdryaoc
w,,..a. a 3 Page 1
PRIOR COMMITTEEIBOARD ACTIONS
r
The District's current Investment Policy Statement was reviewed and approved by
FAHR on July 13, 2005, and adopted by the Board of Directors on July 20, 2005
(Resolution No. 05-21).
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
Background
The Investment Policy governs the investment activities of Pacific Investment
Management Company (PIMCO), the District's external money manager, on behalf of
the District. On April 25, 2005, the District's Investment Policy Statement received the
Investment Policy Certification of Excellence Award from the Municipal Treasurer's
Association of the United States and Canada. A copy of the letter of certification is
included each year in the annual Investment Policy document. The District received its
first Award of Excellence for the Investment Policy Statement in December 1996.
The Investment Policy document itself consists of the Investment Policy Statement and
the following eight appendices:
A. Summary of Investment Authorization
B. Treasury Management Procedures
C. Investment Manager Certification
D. Investment Pool Questionnaire (LAIF)
E. Board Resolution No. OCSD-05-21
F. Sample Monthly & Quarterly Investment Program Monitoring Reports
G. Sections of the California Government Code Pertinent to Investing Public
Funds
H. Glossary of Investment Terms
This document will be updated and delivered to FAHR Committee members following
the adoption of the District's investment policy statement.
n uMWvwBovtl MprW Bery„I�pBCB Bova PgMea fpvW BapvU'O]BBNvn t�lE)ImeYnvm Vdry Cx
Page 2
Annual Review of Investment Policy
P+ The Investment Policy includes the requirement that the District shall review its
Investment Policy annually (Sections 1.2 and 16.1).
This staff report presents the annual review of the District's Investment Policy Statement
to the FAHR Committee for consideration in the Committee's capacity as the oversight
committee for the District's investment program (Section 16.2). With adoption of the
attached Resolution, the Board of Directors would re-adopt the District's current
Investment Policy Statement, portfolio performance benchmarks, and monitoring and
reporting requirements.
The District's Investment Policy Statement is recommended for adoption for FY 2006-07
with a minor change from FY 2005-06 due to a change in the State Government Code.
Section 53601 of the State Govemment Code has reduced the maximum percentage
rate that the portfolio may be invested in commercial paper from 30 percent to 25
percent, so long as the average maturity of all commercial paper in the portfolio does
not exceed 31 days.
Accordingly, staff is proposing that Sections 6.3 and 11.6 of the District's Investment
Policy Statement be changed to reflect this legislative restriction reducing the maximum
percentage rate from 30% to 25% of the portfolio that may be invested in commercial
paper, so long as the average maturity of all commercial paper in the portfolio does not
exceed 31 days.
Staff will continue to monitor pending legislative and regulatory proposals in the public
finance area for their potential impact on the District's existing financial programs.
Annual Delegation of Investment Authority
Effective January 1, 1997, Section 53607 of the Code states that governing boards of
local agencies may only delegate authority to invest and/or reinvest agency funds to the
agency's Treasurer for a one-year period.
With adoption of the attached Resolution, the Board of Directors would renew its
delegation of investment authority to the Director of Finance/Treasurer for a one-year
period in compliance with the requirements of Section 53607. Each year, the Board of
Directors will consider similar actions along with the annual reconsideration of the
District's Investment Policy.
ATTACHMENTS
1. Proposed Resolution No. OCSD 06-17
2. Exhibit A- OCSD's FY 2006-07 Investment Policy Statement
3. Exhibit B - Performance Monitoring & Reporting
n.��dO R�e�BmE/q^GenRw^y nevusn)asNam Gael�,Mammnidky.aoc
Page 3
0
RESOLUTION NO. OCSD-OB-17
AUTHORIZING THE DISTRICTS TREASURER TO INVEST AND/OR
REINVEST DISTRICTS FUNDS, AND ADOPTING DISTRICTS INVESTMENT
POLICY STATEMENT AND PERFORMANCE BENCHMARKS
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE ORANGE
COUNTY SANITATION DISTRICT, AUTHORIZING THE DISTRICTS
TREASURER TO INVEST AND/OR REINVEST DISTRICTS FUNDS, AND
ADOPTING DISTRICTS INVESTMENT POLICY STATEMENT AND
PERFORMANCE BENCHMARKS; AND REPEALING RESOLUTION NO.
OCSD 05-21
.. .. . . .. .. .. . . .
WHEREAS, on July 20, 2005, the Board of Directors adopted Resolution No. 05-21,
readopting the District's Investment Policy Statement, and establishing specific performance
benchmarks and objectives, together with a schedule of frequency of investment performance
reports; and,
WHEREAS, pursuant to California Government Code Section 53607, the Board of
Directors may delegate authority to invest and/or reinvest District's funds to the Treasurer for a
one-year period; and,
WHEREAS, pursuant to California Government Code Section 53646, the District is
required to review its Investment Policy annually and readopt its Policy at a public meeting,
which Policy will establish specific performance benchmarks and objectives, and speck
monitoring and reports.
NOW, THEREFORE, the Board of Directors of the Orange County Sanitation District,
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1: That the authority of the Board of Directors to invest or reinvest District's
surplus funds, or to sell or exchange securities so purchased, or to deposit for safekeeping the
funds and investments of the Districts whh depositories, as provided for in California
Government Code Sections 53608 and 53630, is hereby delegated to the District's Treasurer for
a one-year period commencing on the date this Resolution is adopted, as authorized by
California Government Code Section 53607.
. t
Section 2: That the Board of Directors hereby adopts the Investment Policy
Statement of the Orange County Sanitation District, as set forth in Exhibit"A", attached hereto
and incorporated herein by reference.
Section 3: That the Board of Directors hereby adopts the following speck
performance benchmarks for their two investment funds in accordance with Section 14.0 of the
District's Investment Policy:
LIQUID OPERATING MONIES: The Short-Term Operating Fund will be compared to
the three month T-Bill rate, and the Callan Active Cash Flow Income Style Group. The
Callan Active Cash Flow Income Style Group represents a peer group of managers who
operate with a maximum maturity of one year.
LONG-TERM OPERATING MONIES: The Long-Term Operating Fund will be compared
to the Merrill Lynch Government and Corporate One-to-Five Year Maturity Index and to
the Callan Defensive Fixed Income Style Group.
Section 4: That the Board of Directors hereby adopts a performance monitoring and
reporting schedule, as required by Section 15.0 of the District's Investment Policy, which
schedule is attached hereto as Exhibit"B", and incorporated herein by reference.
Section 5: That Resolution No. OCSD 05-21 is hereby repealed.
PASSED AND ADOPTED at regular meeting held July 19, 2006.
Chair
ATTEST:
Board Secretary
M:WepMge daT MRWMIU00fi6'1]OBW8.MM Invest Fulls Res lu w AU 1.do
SSXp„)
J
♦ p
E
ORANGE COUNTY SANITATION
DISTRICT
INVESTMENT
POLICY
STATEMENT
Proposed for
Review and Approval
By
Finance, Administration and Human Resources
Committee
On
July 12, 2006
And for Adoption
By
Board of Directors
On
July 19, 2006
TABLE OF CONTENTS
Section TOPIC Page
1.0 Policy...................................................................................... 1
2.0 Scope ..................................................................................... 1
3.0 Standard of Prudence............................................................. 1
4.0 Investment Objectives ............................................................2
5.0 Delegation of Authority...........................................................2
6.0 Ethics and Conflicts of Interest...............................................3
7.0 Authorized Financial Dealers and Institutions.........................3
8.0 Authorized and Suitable Investments.....................................5
9.0 Collateralization......................................................................9
10.0 Safekeeping and Custody .....................................................10
11.0 Diversification ........................................................................10
12.0 Maximum Maturities...............................................................11
13.0 Internal Control......................................................................12
14.0 Performance Objectives and Benchmarks ............................12
15.0 Reporting...............................................................................13
16.0 Investment Policy Adoption and Revision..............................14
Appendix
A. Summary of Investment Authorization
B. Treasury Management Procedures
C. Investment Manager Certification
D. Investment Pool Questionnaire (LAIF)
E. Board Resolution No. OCSD-06-XX, Authorizing the District's Treasurer to Invest
and/or Reinvest District Funds, and Adopting Investment Policy and
Performance Benchmarks
F. Monthly & Quarterly Investment Program Monitoring Reports
G. Sections of the California Government Code Pertinent to Investing Public Funds
H. Glossary of Investment Terms
ORANGE COUNTY SANITATION DISTRICT
o INVESTMENT POLICY STATEMENT
1.0 Policy:
It is the policy of the Orange County Sanitation District (OCSD) to invest public funds in a
manner which ensures the safety and preservation of capital while meeting reasonably
anticipated operating expenditure needs, achieving a reasonable rate of return and
conforming to all state and local statutes governing the investment of public funds.
1.1. This Investment Policy is set forth by OCSD for the following purposes:
1.1.1. To establish a clear understanding for the Board of Directors,
OCSD management, responsible employees and third parties of the
objectives, policies and guidelines for the investment of the OCSD's idle and
surplus funds.
1.1.2. To offerguidance to investment staff and any external investment
advisors on the investment of OCSD funds (see Appendix "A").
1.1.3. To establish a basis for evaluating investment results.
1.2. OCSD establishes investment policies which meet its current investment
goals. OCSD shall review this policy annually, and may change its policies
as its investment objectives change.
2.0 Scope:
This Investment Policy applies to all financial assets of OCSD; except for the proceeds of
OCSD's capital projects financing program, which are invested in accordance with
provisions of their specific bond indentures; and such other funds excluded by law or other
Board-approved covenant or agreement.
These funds are accounted for by OCSD as Enterprise Funds as represented in OCSD's
Comprehensive Annual Financial Report.
3.0 Standard of Prudence:
The standard of prudence to be used by OCSD internal staff, and any authorized
investment advisor(s), shall be as described in Section 53600.3 of the California
Government Code as follows: Except as provided in subdivision (a) of Section
27000.3, all governing bodies of local agencies or persons authorized to make
investment decisions on behalf of those local agencies investing public funds
pursuant to this chapter are trustees and therefore fiduciaries subject to the
prudent investor standard. When investing, reinvesting, purchasing, acquiring,
exchanging, selling, or managing public funds, a trustee shall act with care, skill,
Page 1 of 14
prudence, and diligence under the circumstances then prevailing, including,but not
limited to,the general economic conditions and the anticipated needs of the agency,
that a prudent person acting in a like capacity and familiarity with those matters °
would use in the conduct of funds of a like character and with like aims, to
safeguard the principal and maintain the liquidity needs of the agency. Within the
limitations of this section and considering individual investments as part of an
overall strategy, investments may be acquired as authorized by law.
4.0 Investment Objectives:
The primary objectives of OCSDs investment activities, in priority order, and as described
in Section 53600.5 of the California Government Code, shall be:
4.1 Safety: The safety and preservation of principal is the foremost objective of
the investment program of OCSD. Investments shall be selected in a
manner that seeks to ensure the preservation of capital in OCSD's overall
portfolio. This will be accomplished through a program of diversification,
more fully described in Section 11.0, and maturity limitations, more fully
described in Section 12.0, in order that potential losses on individual
securities do not exceed the income generated from the remainder of the
portfolio.
4.2 Liquidity: The investment program will be administered in a mannerthat will
ensure that sufficient funds are available for OCSD to meet its reasonably
anticipated operating expenditure needs.
4.3 Return on Investments: The OCSD investment portfolio will be structured
and managed with the objective of achieving a rate of return throughout
budgetary and economic cycles, commensurate with legal, safety, and
liquidity considerations.
5.0 Delegation of Authority:
5.1 Authority to manage OCSD's investment program is derived from the
California Government Code Sections 53600 at seq. and Sections 53635 at
seq. The Board of Directors hereby delegates management responsibility
forthe OCSD investment program to its Director of Finance/Treasurer,who
shall establish written procedures for the operation of the investment
program,consistent with this Policy. The Controller/Assistant Treasurer shall
be responsible for day-today administration, monitoring, and the
development of written administrative procedures for the operation of the
investment program, consistent with this Policy. The current treasury
management procedures are presented in Appendix "B." No person may
engage in an investment transaction except as provided under the terms of
this Policy and the procedures established by the Treasurer. The Treasurer
shall be responsible for all transactions undertaken by OCSD internal staff,
and shall establish a system of controls to regulate the activities of internal
staff and external investment advisors engaged in accordance with Section
5.3.
Page 2 of 14
5.2 The administrative procedures for the operation of OCSD's investment
r program will provide for, but not be limited to, the following:
5.2.1 Formats for monthly and quarterly reports to the Finance,
Administration and Human Resources Committee, and the Board of
Directors.
5.2.2 Compliance with generally accepted accounting principles of the
Government Accounting Standards Board.
5.2.3 Establishment of benchmarks for performance measurement.
5.2.4 Establishment of a system of written internal controls.
5.2.5 Establishment of written procedures for competitive bids and
offerings of securities that may be purchased or sold by internal OCSD staff.
5.2.6 Establishment of a Desk Procedures Manual for treasury
operations and management.
5.3 The Board of Directors of OCSD may, in its discretion, engage the services
of one or more registered investment advisors to assist in the management
of OCSD's investment portfolio in a manner consistent with OCSD's
objectives. Such external investment advisors, which shall be selected
through a competitive process, shall be granted discretion to purchase and
sell investment securities in accordance with this Investment Policy. Such
advisors must be registered under the Investment Advisers Act of 1940, or
be exempt from such registration.
6.0 Ethics and Conflicts of Interest:
6.1 Officers and employees of OCSD involved in the investment process shall
refrain from personal business activities that could conflict with proper
execution of OCSD's investment program, or which could impair their ability
to make impartial investment decisions. Employees and investment officials
shall disclose to the General Manager any material financial interests in
financial institutions that conduct business within OCSD's boundaries, and
they shall further disclose any large personal f nancial/investment positions,
the performance of which could be related to the performance of positions in
OCSD's portfolio.
7.0 Authorized Financial Dealers and Institutions:
7.1 For investment transactions conducted by OCSD internal staff,the Treasurer
will maintain a list of financial institutions authorized to provide investment
services to OCSD, including "primary"or regional dealers that qualify under
Page 3 of 14
Securities and Exchange Commission Rule 15C3-1 (Uniform Net Capital
rule), and Federal or State of California chartered banks. No public deposit
shall be made except in a qualified public depository as established by State r
law.
All financial institutions which desire to become qualified bidders for
investment transactions with OCSD must supply the following for evaluation
by the Treasurer:
7.1.1. Audited financial statements for the institution's three (3) most
recent fiscal years.
7.1.2. A statement, in the format prescribed by the Government Finance
Officers Association (GFOA), certifying that the institution has reviewed
OCSD's Investment Policy and that all securities offered to the Districts shall
comply fully and in every instance with all provisions of the California
Government Code and with this Investment Policy. The current statement is
presented in Appendix "C."
7.1.3. A statement describing the regulatory status of the dealer,and the
background and expertise of the dealer's representatives.
Selection of financial institutions, broker/dealers, and banks authorized to
engage in transactions with OCSD shall be made through a competitive
process. An annual review of the financial condition of qualified institutions
will be conducted by the Treasurer.
7.2 Selection of broker/dealers used by external investment advisors
retained by OCSD, shall be in compliance with contract provisions between
OCSD and any external investment advisors,and shall be in substantially the
following form:
Use of Securities Brokers: Neither the Investment Advisor nor any parent,
subsidiary or related firm shall act as a securities broker with respect to any
purchases or sales of securities which may be made on behalf of OCSD,
provided that this limitation shall not prevent the Investment Advisor from
utilizing the services of a securities broker which is a parent, subsidiary or
related firm, provided such broker effects transactions on a "cost only" or
"nonprofit" basis to itself and provides competitive execution. The
Investment Advisor shall provide the Districts with a list of suitable
independent brokerage firms(including names and addresses) meeting the
requirements of Government Code Section 53601.5, and, unless otherwise
directed by OCSD, the Investment Advisor may utilize the service of any of
such independent securities brokerage firms it deems appropriate to the
extent that such firms are competitive with respect to price of services and
execution.
Page 4 of 14
8.0 Authorized and Suitable Investments:
° All investments shall be made in accordance with the California Government Code
including Sections 16429.1 et seq., 53600 et seq.,and 53684,and as described within this
Investment Policy. Permitted investments under this Policy shall include:
8.1 Securities, obligations, participations, or other instruments of, or
issued by, or fully guaranteed as to principal and interest by the US
Government, a federal agency,or a US Government-sponsored enterprise
pursuant to Section 53601 (e) of the California Government Code.
Investment in mortgage-backed bonds and CMOs is not governed by this
Section 8.1, even if such bonds are issued by agencies of the US
Government. See Section 8.2 for conditions of purchase of mortgage-
backed securities. See Section 8.12 for conditions of purchase of CMOs.
8.2 Mortgage-backed securities issued by an agency of the US Government,
which are backed by pools of mortgages guaranteed by the full faith and
credit of the U.S. Government,or an agencythereof. Purchase of mortgage
derivatives, which include interest-only payments (IOs) and principal-only
payments (POs); inverse floaters, and RE-REMICs (Real Estate Mortgage
Investment Conduits), is hereby prohibited.
8.3 Commercial paper of "prime" quality and rated TV by Moody's Investor
Services (Moody's), and rated"A1"by Standard&Poor's Corporation(S&P),
and issued by a domestic corporation organized and operating in the United
States with assets in excess of $500 million and having a rating of"A" or
better on its long-term debt as provided by Moody's or S&P. Purchases of
eligible commercial paper may not exceed 270 days to maturity from the date
of purchase. Purchases of commercial paper shall not exceed 15% of the
market value of the portfolio, except that a maximum of 25% of the market
value of the portfolio may be invested in commercial paper, so long as the
average maturity of all commercial paper in the portfolio does not exceed 31
days. No more than 5% of the market value of the portfolio, or 10% of the
issuer's outstanding paper, may be invested in commercial paper issued by
any one (1) eligible corporation.
8.4 Banker's acceptances issued by institutions, the short-term obligations of
which are rated a minimum of TV by Moody's, or "Al" by S&P provided
that: (a) the acceptance is eligible for purchase by the Federal Reserve
System; (b)the maturity does not exceed 180 days; (c)no more than 40%of
the total portfolio may be invested in banker's acceptances;and (d) no more
than 30% of the total portfolio may be invested in the banker's acceptances
of any one (1) commercial bank.
8.5 Medium term(or corporate) notes of a maximum of five(5)years maturity
issued by corporations organized and operating within the United States, or
issued by depository institutions licensed by the United States, or any state,
and operating within the United States with assets in excess of$500 million,
and which is rated in a rating category of"A" or better on its long-term debt
Page 5 of 14
as provided by Moody's or S&P. Notes eligible for investment under this
section shall be rated at least "AY or better by Moody's, or"A-"or better by
S&P. If, at the time of purchase, an eligible note is rated in a rating category
of "A" or better by only one rating agency, the note shall also be rated at
least "BBB" by the other rating agency. If, after purchase, the rating of an
eligible note in a rating category of"A"or better, is downgraded to"BBB,"the
external investment advisor shall notify the District of the downgrade, and
shall present an analysis and recommendations as to the disposition of the
note consistent with the investment objectives of this Investment Policy. The
above restrictions pertain to the "direct issuer" and do not extend to the
parent corporation of the direct issuer. No more than 35% of the portfolio
may be invested in both medium term notes, as described here in 8.5, and
notes, bonds, or other obligations, as described in 8.6.
8.6 Notes, bonds, or other obligations that are at all times secured by a valid
first priority security interest in securities of the types listed by California
Government Code Section 53651 as eligible securities for the purpose of
securing local agency deposits having a market value at least equal to that
required by California Government Code Section 53652 for the purpose of
securing local agency deposits. The securities serving as collateral shall be
placed by delivery or book entry into the custody of a trust company or the
trust department of a bank that is not affiliated with the issuer of the secured
obligation, and the security interest shall be perfected in accordance with the
requirements of the Uniform Commercial Code or federal regulations
applicable to the types of securities in which the security interest is granted.
No more than 35%of the portfolio may be invested in securities described in
8.5 and 8.6.
8.7 Shares of mutual funds investing in securities permitted under this policy
and under Section 53601 (k) of the California Government Code. Such
funds must either: (1) attain the highest ranking, or the highest letter and
numerical rating, provided by not less than two of the three largest
nationally recognized rating services; or (2) have an Investment Advisor
registered with the Securities and Exchange Commission with not less
than five (5) years of experience investing in the securities and obligations
authorized under this Policy and under California Government Code
Section 53601, and with assets under management in excess of$500
million. The purchase price of shares of beneficial interest purchased
pursuant to this policy, and the California Government Code may not
include any commission that the companies may charge, and shall not
exceed 15% of the District's surplus money that may be invested pursuant
to this section. However, no more than 10% of the District's surplus funds
may be invested in shares of beneficial interest of any one (1) mutual fund
pursuant to this section.
Page 6 of 14
8.8 Certificates of deposit:
' 8.8.1 Secured (collateralized) time deposits issued by a nationally or
state-chartered bank or state or federal savings and loan association, as
defined by Section 5102 of the California Financial Code, and having a net
operating profit in the two(2)most recently completed fiscal years. Collateral
must comply with Chapter 4, Bank Deposit Law, Section 16500 et seq., and
Chapter 4.5, Savings and Loan Association and Credit Union Deposit Law,
Section 16600 et seq., of the California Government Code.
8.8.2 Negotiable certificates of deposit(NCDs)issued by a nationally or
state-chartered bank or state of federal savings and loan association, as
defined by Section 5102 of the California Financial Code; and which shall
have a rating of"A"or better on its long-term debt as provided by Moody's or
S&P; or which shall have the following minimum short-term ratings by at least
two (2) rating services: "P1" for deposits by Moody's, "A1" for deposits by
S&P, or comparably rated by a nationally recognized rating agency which
rates such securities; or as otherwise approved by the District's Board of
Directors.
8.8.3 To be eligible to receive local agency money, a bank, savings
association,federal association,or federally insured individual loan company
shall have received an overall rating of not less than"satisfactory"in its most
recent evaluation by the appropriate federal financial supervisorial agency of
its record of meeting the credit needs of California's communities, including
low and moderate income neighborhoods, pursuant to Section 2906 of Title
12 of the United States Code.
8.9 Taxable or tax-exempt municipal bonds issued by the State of California
or its subdivisions. Such securities must be rated"A3"or higher by Moody's,
or"A-"or higher by S&P; or as otherwise approved by the Districts' Board of
Directors.
8.10 The State of California Local Agency Investment Fund(LAIF). The LAW
is an investment alternative for California's local governments and special
districts managed by the State Treasurer's Office. LAW is more fully
described in the Glossary(See Appendix"H.") The District shall use LAIF as
a short-term cash management facility. Investment of District funds in LAW
shall be subject to investigation and due diligence priorto investing,and on a
continual basis to a level of review pursuant to Section 3.0, Standard of
Prudence, of this Policy. See Appendix "D" for investment pool
questionnaire.
8.11 The Orange County Treasurer's Money Market Commingled Investment
Pool(OCCIP). The OCCIP is a money market investment pool managed by
the Orange County Treasurer's Office. OCCIP is more fully described in the
Glossary. (See Appendix"H.") The District has no funds invested in OCCIP
at this time. Investment of District funds in OCCIP would be subject to
Page 7 of 14
investigation and due diligence prior to investing, and on a continual basis to
a level of review pursuant to Section 3.0, Standard of Prudence, of this
Policy.
8.12 Collateralized mortgage obligations(CMOs)issued by agencies of the US
Government which are backed by pools of mortgages guaranteed by the full
faith and credit of the U.S. Government, or an agency thereof, and asset-
backed securities rated "Aaa" by Moody's and "AAA" by S&P. Selection of
mortgage derivatives, which include interest-only payments (IOs) and
principal-only payments (POs); inverse floaters, and RE-REMICS (Real
Estate Mortgage Investment Conduits), is hereby prohibited. Securities
eligible for purchase under this Section 8.11 shall be issued by an issuer
having a rating on its unsecured long-term debt of"A"or higher. Combined
purchases of mortgage-backed securities, CMOs and asset-backed
securities as authorized under within Section 8.0,may not exceed 20%of the
total Long-Term Operating Monies portfolio.
8.13 Repurchase agreements provided that:
8.13.1 All repurchase agreements shall be collateralized with securities
eligible for purchase under this Policy. In order to anticipate market changes
and to provide a level of security for all repurchase agreement transactions,
collateralization shall be maintained at a level of at least 102%of the market
value of the repurchase agreements, and shall be adjusted no less than
weekly.
8.13.2 All repurchase agreements must be the subject of a Master
Repurchase Agreement between OCSD and the provider of the repurchase
agreement. The Master Repurchase Agreement shall be substantially in the
form developed by The Bond Market Association.
8.14 Reverse repurchase agreements provided that:
8.14.1 No more than five percent (5%) of OCSD's portfolio shall be
invested in reverse repurchase agreements, and there shall be no long-term
reverse repurchase agreements unless otherwise authorized by the Districts'
Board of Directors.
8.14.2 The maximum maturity of reverse repurchase agreements shall
be ninety (90) days.
8.14.3 Reverse repurchase agreements shall mature on the exact date
of a known cash flow which will be unconditionally available to repay the
maturing reverse repurchase agreement.
8.14.4 Proceeds of reverse repurchase agreements shall be used solely
to supplement portfolio income or to provide portfolio liquidity, and shall not
be used to speculate on market movements.
Page 8 of 14
a
8.14.5 All reverse repurchase agreements must be the subject of a
I Master Repurchase Agreement between OCSD and the provider of the
reverse repurchase agreement. The Master Repurchase Agreement shall be
substantially in the form developed by The Bond Market Association.
8.15 Sales of OCSD-owned securities in the secondary market may incur losses
in order to improve the risk or return characteristics of the portfolio, to
prevent anticipated further erosion of principal,or when trading for securities
that result in an expected net economic gain to OCSD.
8.16 If securities owned by the OCSD are downgraded by either Moody's or S&P
to a level below the quality required by this Investment Policy, it shall be
OCSD's policy to review the credit situation and make a determination as to
whether to sell or retain such securities in the portfolio. If a decision is made
to retain the downgraded securities in the portfolio, their presence in the
portfolio will be monitored and reported monthly to the OCSD General
Manager, the Finance, Administration and Human Resources Committee
and Board of Directors.
9.0 Collateralization:
Generally, the value to secure deposits under this Policy shall comply with Section 53652
of the California Government Code. Collateralization will be required for secured time
deposits, as more fully described in Section 8.7.1; and repurchase agreements, as more
fully described in Section 8.12.1. Collateral will always be held by an independent third-
party, as more fully described in Section 10.1. The right of collateral substitution is
granted.
10.0 Safekeeping and Custody:
10.1 All securities transactions, including collateral for repurchase agreements,
entered into by, or on behalf of OCSD, shall be conducted on a
delivery-versus-payment(DVP) basis. Securities will be held by OCSD's
third-party custodian bank, which shall be selected through a competitive
process, or that agent's representative, or in the agent's account at the
Federal Reserve Bank, or within clearing corporations in the U.S., and
evidenced by book entry statements.
11.0 Diversification:
OCSD will diversify its investments by security type, issuer, and financial institution in
accordance with the following:
11.1 There is no limit on investment insecurities issued by or guaranteed by the
full faith and credit of the U.S. government.
Page 9 of 14
e
11.2 No more than 20% of the portfolio may be invested in securities of a single
agency of the U.S. government, which does not provide the full faith and
credit of the U.S. government.
11.3 No more than 5% of the portfolio may be invested in securities of any one
issuer, other than the U.S. government or its agencies. Investment in mutual
funds is not governed by this Section 11.3. See Section 11.8 for conditions
of purchase of mutual funds.
11.4 No individual holding shall constitute more than 5% of the total debt
outstanding of any issuer.
11.5 No more than 40%of the portfolio may be invested in banker's acceptances.
11.6 No more than 15% of the portfolio may be invested in commercial paper,
except that 25% of the portfolio may be so invested so long as the average
maturity of all commercial paper in the portfolio does not exceed 31 days.
11.7 No more than 30% of the portfolio may be invested in medium-term
(corporate) notes.
11.8 No more than 15% of the portfolio may be invested in mutual funds.
However, no more than 10% of the District's portfolio may be invested in
shares of beneficial interest of any one (1) mutual fund.
11.9 No more than 30%of the portfolio may be invested in negotiable certificates
of deposit.
11.10 No more than 10% of the portfolio may be invested in eligible municipal
bonds.
11.11 No more than 20% of the Long Term Operating Monies portfolio may be
invested in a combination of mortgage-backed securities, CMOs and asset-
backed securities. Mortgage-backed securities, CMOs and asset-backed
securities may only be purchased by the Districts' extemal money managers,
Pacific Investment Management Company (PIMCO), with prior Board
approval (authorized by Board Minute Order, January 22, 1997), and may not
be purchased by the District's staff.
11.12 No more than the lesser of 15% of the portfolio or the statutory maximum
may be invested in LAIF.
11.13 No more than 15% of the portfolio may be invested in the Orange County
Investment Pool.
11.14 No more than 20% of the portfolio may be invested in repurchase
agreements.
Page 10 of 14
e
11.15 No more than 5% of the portfolio may be invested in reverse repurchase
agreements.
12.0 Maximum Maturities:
To the extent possible, OCSD will attempt to match its investments with reasonably
anticipated cash flow requirements. The Treasurer shall develop a five-year cash flow
forecast, which shall be updated quarterly. Based on this forecast, the Treasurer shall
designate, from time-to-time, the amounts to be allocated to the investment portfolio.
OCSD monies invested in accordance with this Policy are divided into two (2) categories:
12.1 Liquid Operating Monies. Funds needed for current operating and capital
expenditures are known as Liquid Operating Monies.
12.1.1 The maximum final stated maturity of individual securities in the
Liquid Operating Monies account portfolio shall be one(1)year from the date
of purchase.
12.1.2 The average duration of the Liquid Operating Monies account
portfolio shall be recommended by the Treasurer based on the Districts'cash
flow requirements, but may never exceed 180 days.
12.2 Long Term Operating Monies. Funds needed for longer term purposes are
known as the Long Term Operating Monies.
12.2.1 Except for the purchase of securities by the District's external
money manger, PIMCO, the maximum final stated maturity of individual
securities in the Long Term Operating Monies account portfolio shall be five
(5)years from the date of purchase. PIMCO may purchase any security that
is permitted under Section 8.0 of this policy, including those which may have
a stated maturity of more than five(5)years from the date of purchase when,
in the opinion of PIMCO, such an investment meets the investment
objectives of this portfolio and the duration requirements are met below.
12.2.2 The duration of the Long Term Operating Monies account
portfolio shall be recommended by the Treasurer based on the Districts'five-
year cash flow forecast, but may never exceed 60 months.
12.2.3 The duration of the Long Term Operating Monies account portfolio
shall never exceed 120% of the duration as established in accordance with
Section 12.2.2.
12.2.4 The duration of the Long Term Operating Monies account portfolio
shall never be less than 80% of the duration as established in accordance
with Section 12.2.2
Page 11 of 14
13.0 Internal Control:
13.1 The Treasurer shall establish an annual process of independent review by an
external auditor. This review will provide internal control by assuring
compliance with policies and procedures. The current treasury management
procedures are presented in Appendix "B."
14.0 Performance Objectives and Benchmarks:
14.1 Overall objective. The investment portfolio of OCSD shall be designed with
the overall objective of obtaining a rate of return throughout budgetary and
economic cycles, commensurate with investment risk constraints and
reasonably anticipated cash flow needs.
14.2 The Liquid Operating Monies. The investment performance objective for
the Liquid Operating Monies shall be to earn a total rate of return over a
market cycle which exceeds the return on a market index approved by the
Finance, Administration and Human Resources Committee, and by the
District's Board of Directors,when the duration of the portfolio is established.
This market index is more fully described in Board Resolution
No. OCSD-00-16 (see Appendix "E").
14.3 The Long Term Operating Monies. The investment performance objective
for the Long Term Operating Monies shall be to earn a total rate of return
over a market cycle which exceeds the return on a market index selected by
the Finance,Administration and Human Resources Committee and approved
by the Districts' Board of Directors, when the duration of the portfolio is
established. This market index is more fully described in Board Resolution
No. OCSD-00-16 (See Appendix "E").
15.0 Reporting:
15.1 Monthly and quarterly investment reports shall be submitted by the Treasurer
to the Finance,Administration and Human Resources Committee which shall
forward the reports to the District's Board of Directors. The monthly reports
shall be submitted to the Finance, Administration and Human Resources
Committee within 30 days of the end of the month in accordance with
California Government Code Sections 53607, 53646, and this Investment
Policy. The quarterly reports shall provide clear and concise status
information on the District's portfolios at the end of each reporting period,
including performance measures using the benchmarks described in Section
14.0 of this Investment Policy. Sample monthly and quarterly reports are
presented in Appendix "F." These reports shall contain listings of individual
securities held at the end of each reporting period, and shall disclose, at a
minimum,the following information about the risk characteristics of OCSD's
portfolio:
Page 12 of 14
15.1.1 Cost and accurate and complete market value of the portfolio.
I
15.1.2 Modified duration of the portfolio compared to Benchmark.
15.1.3 Dollar change in value of the portfolio for a one-percent (1%)
change in interest rates.
15.1.4 Percent of portfolio invested in reverse repurchase agreements,
and a schedule which matches the maturity of such reverse repurchase
agreements with the cash flows which are available to repay them at
maturity.
15.1.5 For the Liquid Operating Monies account only, the percent of
portfolio maturing within 90 days.
15.1.6 Average portfolio credit quality.
15.1.7 Percent of portfolio with credit ratings below "A" by any rating
agency, and a description of such securities.
15.1.8 State that all investments are in compliance with this policy and
the California Government Code, or provide a listing of any transactions or
holdings which do not comply with this policy or with the California
Government Code.
15.1.9 Time-weighted total rate of return for the portfolio for the prior
three months, twelve months, year to date, and since inception
compared to the Benchmark returns for the same periods.
15.1.10 State that sufficient funds are available for OCSD to meet its
operating expenditure requirements for the next six months, or if not, state
the reasons for the shortfall.
15.2 OCSD's Treasurer shall meet quarterly with the Finance,Administration and
Human Resources Committee to review investment performance, proposed
strategies and compliance with this Investment Policy. External investment
advisors may be required to attend said meetings at the discretion of the
Chairman of the Finance,Administration and Human Resources Committee.
16.0 Investment Policy Adoption and Revision:
16.1 The Investment Policy of OCSD shall be reviewed by the Finance,
Administration and Human Resources Committee and shall be adopted by
resolution of the Board of Directors of OCSD. The Policy shall be reviewed
on an annual basis in accordance with California Government Code Section
53646, and this Investment Policy, by the Finance, Administration and
Human Resources Committee, which shall recommend revisions, as
Page 13 of 14
appropriate,to the Board of Directors. Any modifications made thereto shall
be approved by the Board of Directors.
i
16.2 The Finance, Administration and Human Resources Committee shall serve
as the oversight committee for the District's Investment program and shall
adopt guidelines for the ongoing review of duration, quality and liquidity of the
District's portfolio.
Page 14 of 14
APPENDIX "A"
SUMMARY OF INVESTMENT AUTHORIZATION
INTERNAL AND EXTERNAL MANAGERS
SHORT TERM OPERATING FUND
INVESTMENT INTERNAL EXTERNAL
U.S. Treasuries OK OK
Federal Agencies Fixed coupon, fixed mat. OK
Mortgage-backed NO NO
Commercial paper OK OK
Banker's Accept. OK OK
Medium Term Notes Fixed coupon, fixed mat.* OK
Mutual Funds Money Market Only" Money Market Only
Negotiable CDs Fixed coupon, fixed mat.' OK
Municipal Bonds OK' NO
LAW OK NO
OCIP OK NO
CMOs NO NO
Asset-backed NO NO
Repurchase Agree. OK OK
Reverse Repos OK' OK
LONG TERM OPERATING PORTFOLIO
INVESTMENT INTERNAL EXTERNAL
U.S. Treasuries OK OK
Federal Agencies Fixed coupon, fixed mat. OK
Mortgage-backed NO OK
Mutual Funds Money Market Only" OK
Negotiable CDs Fixed coupon, fixed mat.* OK
Municipal Bonds OK' OK
LAW OK NO
OCIP OK NO
CMOs NO With Board Approval
Asset-backed NO With Board Approval
Repurchase Agree. OK OK
Reverse Repos OK' OK
'With prior approval of the Finance,Administration and Human Resources Committee.
"Using financial institutions approved by the Finance,Administration and Human Resources Committee.
H:IMpIlpe T MRWMH W9WMM.M53.Inv gFUMS ftWWWJ 3M
EXHIBIT "B"
ORANGE COUNTY SANTIATION DISTRICT
PERFORMANCE MONITORING & REPORTING
FOR THE
DISTRICT'S INVESTMENT PROGRAM
POLICY
REFERENCE PERFORMANCE CHARACTERISTIC REPORTING PARTY*
PIMCO MELLON CALLAN
15.1.1 Cost and market value of the portfolio(monthly mark-to-market). M, Q M, Q Q
15.1.2 Modified duration of the portfolio compared to benchmark. M, Q Q
15.1.3 Dollar change in value of the portfolio for a 1% change in Interest rate. M, Q Q
15.1.4 Percent of portfolio invested in reverse repurchase agreements, and a schedule which M, Q
matches the maturity of such reverse repurchase agreements with the cash flows which
are available to repay them at maturity.
16.1.6 For the Liquid Operating Monies account only, the percent of portfolio maturing within 90 M, Q q
days.
15.1.6 Average portfolio credit quality. M, q Q
15.1.7 Percent of portfolio with credit ratings below "A" by any rating agency, and a description M, Q Q
of such securities.
15.1.8 Listing of any transaction or holdings which do not comply with this policy or with the M, Q
California Government Code.
15.1.9 Time-weighted total rate of return for the portfolio for the prior three months,twelve M, Q q
months, year-to-date,and since Inception compared to the benchmark returns for the
same periods.
ADDL** Comparison of portfolio performance to market index benchmark. M,Q Q
ADDL" Comparison of Manager's performance to peergroup benchmark. Q
ADDL** Monitoring of organizational and structural changes of Investment management firm. Q
ADDL** Audit portfolios for compliance with Investment policy guidelines. Q
15.1.10 OCSD will report if sufficient funds are available for it to meet operating expenditure requirements for the next six months, or if
not,state the reason for the shortfall.
Notes
*M = Monthly
*Q =Quarterly
**ADDL= Monitoring of Additional Performance Characteristics H:IdeptlagendalFAHRIFAHR20 0 610 7 0 610 6.06-60.lnvost Funds Resolution-AR 7.doc
MINUTES OF LEGISLATIVE AFFAIRS
COMMITTEE MEETING
Orange County Sanitation District
Tuesday, July 11,2006, 8:00 a.m.
A meeting of the Legislative Affairs Committee of the Orange County Sanitation District was held
on July 11, 2006, at 8:00 a.m., in the Sanitation District's Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
LEGISLATIVE AFFAIRS STAFF PRESENT:
COMMITTEE MEMBERS: Jim Ruth, Interim General Manager
Bob Ghirelli, Director of Technical Services
Directors Present via Penny Kyle, Committee Secretary
Teleconference: Michael Gold, Legislative Affairs Liaison
Jim Colston, Legal & Regulatory Affairs Liaison
Jim Fenyman, Board Chair Layne Baroldi, Legal & Regulatory Affairs Liaison
Steve Anderson, Past Board Chair Dean Fisher, Engineering Supervisor
DIRECTORS ABSENT: OTHERS PRESENT
James W. Silva OTHERS PRESENT via Teleconference:
Eric Saperstein
Sean Fitzgerald
Scott Baugh
Heather Dion
John Freshman
Holly Shinstock
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Chair Ferryman had no report.
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, had no report.
(6) REPORT OF DIRECTOR OF TECHNICAL SERVICES
Bob Ghirelli, Director of Technical Services, did not have a report.
r
Minutes of the Legislative Affairs Committee Meeting
Page 2
July 11, 2006
(7) REPORT OF GENERAL COUNSEL
General Counsel was not present.
(8) CONSENT CALENDAR ITEMS
Consideration of motion to approve all agenda items appearing on the Consent Calendar not
specifically removed from same, as follow:
a. Approve minutes of the June 13,2006 Legislative Affairs Committee meefing.
MOTION: It was moved, seconded and duly carried to approve Item 8(a) under
Consent Calendar.
END OF CONSENT CALENDAR
(9) ACTION ITEMS
a. No items were considered.
(10) INFORMATIONAL PRESENTATIONS
a. LEGO6-06 Legislative Affairs Update
Eric Saperstein and John Freshman provided updates on Director Steve Anderson's trip
to Washington, D.C., in midJune along with Wes Bannister and Virginia Grebbien from
the Orange County Water Distdct. The trip resulted in an increase to the GW RS funding
from$1.23 million to$2.5 million and increased the authorization to relocate the Santa
Ana River Interceptor line (SARI)from $1.8 to$1.9 billion. Due to limited funding and
reductions in the State and Tribal Assistance Grants, there was no success in securing
federal funds to help pay for full secondary treatment costs.
Bob Ghirelli, Director of Technical Services, advised the Committee that the County of
Orange has proposed a Memorandum of Understanding (MOU)delineating the
responsibilities and funding of the SARI. Mr. Ghirelli explained that the Steering
Committee will be asked to provide policy direction at their upcoming meeting.
Michael Gold, Legislative Affairs Liaison, advised he is scheduling a legislative planning
session for October 25 to establish goals for the coming year with the committee
members and lobbyists. He also discussed proposed procedures for taking positions on
legislation. This proposal will be considered as an action item at the August 8th meeting.
Scott Baugh and Sean Fitzgerald updated the Committee on design build legislation and
Proposition 84 (Caves initiative). Scott Baugh introduced his colleague from Platinum
Advisors, Holly Shinstock. Sean Fitzgerald summarized the meeting held with staff and
Mark Adelson from the Santa Ana Regional Water Quality Control Board.
Minutes of the Legislative Affairs Committee Meeting
Page 3
July 11, 2006
(11) CLOSED SESSION
There was no closed session.
(12) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(14) CONSIDERATION OF UPCOMING MEETINGS
The next Legislative Affairs Committee meeting is scheduled for July 11, 2006, at 8:00 a.m.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 8:50 a.m.
Submitted by:
P nny M. I le
Committee Secretary
H:\depfogenda\LEGISLATIVEAFFAJRS\2006XOSCB\OS1306MInul .eac
GWR System Steering Committee
June 12, 2006
MINUTES
GROUNDWATER REPLENISHMENT SYSTEM STEERING COMMITTEE
STEERING COMMITTEE
(A Committee of Orange County Water District
and Orange County Sanitation District Directors)
OCWD Boardroom, 10500 Ellis Avenue, Fountain Valley
Monday, June 12, 2006, 5:30 p.m.
Committee Member
Philip L.Anthony OCWD Director, Chairman ............. Present
Kathryn Barr OCWD Director ............................... Present
Roger Yoh OCWD Director................................ Present
Steve Anderson OCSD Director ................................ Present
Mike Duvall OCSD Director,Vice Chairman....... Present
Carolyn Cavecche OCSD Director ................................Present
Alternates
Jan Debay OCWD Director(No. 1)....................Present
Denis Bilodeau OCWD Director(No.2).................... Present
Steve Sheldon OCWD Director(No. 3)..............Not Present
Jim Ferryman OCSD Director(No. 1) .................... Present
Don Bankhead OCSD Director(No.2) .................... Present
Larry Crandall OCSD Director(No.3) ....................Present
Other Director Present
None
CONSENT CALENDAR(ITEM NO.1.2) MOTIONNOTE ACTION TAKEN
1. MINUTES OF PREVIOUS MEETING ANTHONY— AYE
RECOMMENDATION:Approve Minutes of the May 8,2006 BARR— SECOND,AYE APPROVED
Groundwater Replenishment System YOH— AYE
Steering Committee Meeting as mailed ANDERSON-AYE
DDVAu— AYE
CAVECCHE— MOTION,AYE
2. ISSUANCE OF AN AGREEMENT TO JPL ELECTRIC TO ANTHONY— SECOND,AYE
PROVIDE ELECTRICAL SERVICE TO THE GWR SYSTEM BARR— AYE APPROVED
VALVE VAULT AT BALL ROAD YOH— AYE
RECOMMENDATION:Agendize for June 21 OCWD Board ANDERSON-AYE
mee8ng: Authorize issuance of an DuvAu— MOTION,AYE
Agreement in an amount not to exceed CAVECCHE— AYE
$77,875.50 to JPL Electric to provide
electric service for the GWR System valve
vault at Ball Road.
END OF CONSENT
_ 1 _
GWR System Steering Committee
June 12,2006
MATTERS FOR CONSIDERATION
3. CONTRACT NO.GWRS-2003-3—GROUNDWATER ANTHONY— AYE
REPLENISHMENT SYSTEM BARRIER FACILITIES BARR— MOTION,AYE APPROVED
PROJECT(LAYNE CHRISTENSEN COMPANY): CHANGE YOH— SECOND,AYE
ORDER NO. 11 AND NOTICE OF COMPLETION ANDERSON-AYE
RECOMMENDATION: Agendize for the June 21 OCWD Board DUVALL-AYE
meeting: (1) Authorize issuance of Change CAVECCHE— AYE
Order No. 11 for an decrease in contract
price totaling$170,527 and no increase in
contract time;and(2) Accept completion of
work and authorize filing of Notice of
Completion.
INFORMATIONAL ITEMS
4. ADVANCED WATER PURIFICAITON FACILITY COST INFORMATIONAL
SAVINGS UPDATE
5. PROJECT SCHEDULE AND BUDGET UPDATE INFORMATIONAL
IT WAS REPORTED
THAT THE TUNNEL ON
THE UNIT II PIPELINE
JUST NORTH OF SR-
22 HAD BEEN
DAMAGED AND STAFF
IS CURRENTLY
INVESTIGATING THE
CAUSE. ADETAILED
REPORT WILL BE
GIVEN NEXT MONTH.
6. CONSTRUCTION PROJECTS PROGRESS INFORMATIONAL
7. MONTHLY CHANGE ORDER UPDATE INFORMATIONAL
8. STATUS REPORT INFORMATIONAL
• Grants and Loans Update
• Public Infomlation and Education Update
DIRECTORS'ANNOUNCEMENTSIREPORTS
GENERAL MANAGERS'ANNOUNCEMENTS/REPORTS
ADJOURNMENT 6:15 P.M.
_2 _
BOARD OF DIRECTORS McCeng Dare TOBd.Moir.
07/1B/06
AGENDA REPORT Iem Numbe Iem Numbe
17
Orange County Sanitation District
FROM: Robert P. Ghirelli, D Env., Director of Technical Services
Originator: Michael Gold, Legislative Affairs Liaison
SUBJECT: Notification of Legislative Advocate Scott Baugh's Transfer from Mayer,
Brown, Rowe and Maw LLP to Platinum Advisors
GENERAL MANAGER'S RECOMMENDATION
Approve new contract with Platinum Advisors at $5,000 per month for a nine-month
period from April 1, 2006 through December 31, 2006 for Legislative Advocacy Services
and the option to renew for an additional one-year period at the discretion of the
Steering Committee and return to the Board of Directors for approval.
SUMMARY
On December 21, 2005 the Board of Directors approved a contract with Mayer, Brown,
Rowe and Maw, LLP for Legislative Advocacy Services to be provided by Scott Baugh.
This contract was for services through the December 31, 2006. However, since that
time, Mr. Baugh has changed firms and is no longer employed by Mayer, Brown, Rowe
and Maw, LLP (effective March 31, 2005). Mr Baugh notified OCSD he is now
employed with a new firm, Platinum Advisors.
The intent of the original agreement was to utilize the services of Scott Baugh and staff
believes it is still the intent of the Board of Directors to maintain legislative advocacy
services with Scott Baugh through the end of this year. The purpose of this report is to
inform the Board of the change and that OCSD will terminate the contract with Mayer,
Brown, Rowe and Maw and enter into a new contract with Platinum Advisors to continue
Mr. Baugh's services through December 31, 2006.
PRIOR COMMITTEE/BOARD ACTIONS
Board Approval of Contract for $5,000 per month on 12/21/05
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
❑ This item has been budgeted. {Line item: 1
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
F.No Mlox Ap da Repad-BoeM
DePL 320 Reemd 7/I12W
Page 1
ADDITIONAL INFORMATION
It is the intent of the Board of Directors to employ Scott Baugh as one of OCSD's
legislative advocates. The new contract with Platinum Advisors effective April 1, 2006
through December 31, 2006, will be for legislative advocacy services in the amount of
$5,000 per month and not to exceed $45,000 during 2006. There is no change in the
amount or scope of the new contract from the previous Board approved agreement,
The Board will revisit all legislative advocacy services contracts later this year for
services provided in 2007.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
Form No.Dw-102 Agenda Repon-Board
Dept.320 ReVeed 7/1112006
Page 2
' BOARD OF DIRECTORS Meeang0ate Toad.or .Dtr.
07/19/06
AGENDA REPORT nemNum Item Number
Orange County Sanitation District 1fl
RW Facilities
aci do
lities
FROM: David Ludwin, Director of Engineering
Originator: Hardat Khublall, CIP Project Manager
SUBJECT: SANTA ANA RIVER INTERCEPTOR REALIGNMENT AND
PROTECTION, CONTRACT NO. 2-41
GENERAL MANAGER'S RECOMMENDATION
Approve an agreement with the Irvine Community Development Company to retain and
pay engineering and environmental consultants for an amount not to exceed $200,000
to provide engineering services relating to the SARI line shallow profile alternative study
and Mountain Park Sewer Line Connection, in a form approved by General Counsel.
SUMMARY
The Irvine Community Development Company ([CDC) is planning a 2,500 unit
development project in the Anaheim Hills area. The ICDC would like to connect a
15-inch sewer line from the eastern portion of the Mountain Park development to the
existing SARI line. In exchange for consideration of this connection, ICDC is willing to
retain engineering and environmental consultants, at a cost of up to $200,000, to study
the Shallow Profile Alternative. The engineering consultants would consider the
feasibility and potential costs of the Shallow Profile Alternative and develop information
regarding required easements and permits. The environmental consultants will prepare
analysis for the EIR/SEIS relating to potential environmental impacts of the Shallow
Profile alternative.
The SARI line relocation project may not be complete by the time that ICDC is ready to
connect to the line. Therefore, in the event that ICDC seeks to connect to the SARI line
before the relocation is complete, the draft agreement provides for a temporary
connection by the City of Anaheim to the existing SARI line, subject to permit terms and
conditions required by the District. Once the SARI line relocation is complete, the
Mountain Park line would be permanently connected to the new SARI line by the City of
Anaheim.
Due to several recent meetings between ICDC and the City of Anaheim, the City has
agreed to consider a temporary lift station and force main as an interim solution. The
draft agreement has been revised to include the temporary Mountain Park sewer
connection to be either a gravity siphon under crossing of the river or a lift station with
force main attached to the Gypsum Canyon Road Bridge.
Page 1
PRIOR COMMITTEEIBOARD ACTIONS
On May 4, 2006, the Planning, Design & Construction Committee (PDC) recommended
to the Board of Directors to authorize the execution of an agreement with the Irvine
Community Development Company re relocation of SARI Line and Mountain Park
Sewer Line, and to include determination and resolution of maintenance and liability
issues, in a form approved by General Counsel.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
❑ This item has been budgeted. (Line Rem: )
❑ This Rem has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information Rem)
If additional study is determined necessary by the District beyond the $200,000
committed to by ICDC, the District will be responsible to either pay for the additional
work or to find another party (i.e. County of Orange, SAWPA) to pay the additional
costs.
ADDITIONAL INFORMATION
The Army Corps of Engineers is currently preparing an Environmental Impact
Report/Supplemental Environmental Impact Statement (EIR/SEIS) for the SARI line
relocation project. Part of the project involves relocating the SARI line between the
Green River Golf Course and the SAVI Ranch Control Gate. The EIR/SEIS contains
several alternative alignments. The preferred alignment in the EIR/SEIS is known as
the "Relocate to the South" alternative, and commonly referred to as the "South Bank
Alternative." Under the South Bank Alternative, the pipeline would be placed at a depth
of as much as 60 feet.
OCSD would like to consider a variation of the South Bank Alternative, proposed by
ICDC, where the pipeline would be constructed at a much shallower level. This
proposed variation, called the Shallow Profile Alternative, might be less costly than the
South Bank Alternative. To date, the Shallow Profile Alternative has not been studied in
any detail by the various agencies involved in the SARI relocation project planning
ALTERNATIVES
Do not agree to the terms dictated by ICDC and continue with the County of Orange
maintaining responsible to fully develop any alternatives deemed reasonable for
consideration. The ICDC would be required to connect to the SARI line at SAVI Ranch,
beyond the segment of the SARI line in jeopardy.
Page 2
CEQA FINDINGS
r N/A
ATTACHMENTS
Proposed Letter Agreement with ]CDC
HK:eh
RtIglobal Agenda Draft ReportsUoint BoardstSARI Line AR 062806.doo
Page 3
V
July 19,2006
Bryan Austin
Vice President
Irvine Community Development Company LLC
550 Newport Center Drive
Newport Beach,CA 92658-8904
Re: Mountain Park: Letter Agreement Regarding Relocation of SARI Sewer
Dear Mr.Austin:
This letter memorializes the understandings and agreement of the Orange County Sanitation
District ("OCSD")and Irvine Community Development Company LLC ('YCDC"')regarding
the connection of a sewer line of no greater than 15-inches (the "Mountain Pork Sever
Line") from the East Village portion of ICDC's 2500 unit Mountain Park project (the
"Development") into the Santa Ana River Interceptor ("SARI") Sewer. As we have
discussed, the Los Angeles District of the U.S. Army Corps of Engineers (USACE) is
currently preparing an Environmental Impact Report/Supplemental Environmental Impact
Statement("EIRISEIS') in connection with its Santa Ana River Mainstem Project, including
the proposed protection in place or relocation of a portion of the existing SARI Sewer located
between the Orange County line at the Green River Golf Course area and the SARI Control
Gate in the SAVI Ranch development in Yorba Linda as depicted by the dashed white line
shown on Exhibit A to this letter (the "Affected Segment"). Under the USACE's preferred
relocation plan, the Affected Segment would be moved from its present location within the
Santa Ana River to a location that parallels the SR-91 Riverside Freeway as depicted in red
on Exhibit A(the"South Bank Alternative"). OCSD is willing to allow the City of Anaheim
("City")as the local sewering agency to establish, operate, and maintain a sewer and its
connection of the Mountain Park Sewer Line into the SARI Sewer at OCSD SARI Manhole
ID No. SAR0610-0000 (Contract 2-14.5, Station 1117+02) located on the East side of the
Gypsum Canyon Road Bridge so as to serve the proposed Development subject to the terms
of this letter agreement("Agreement"). The parties to this Agreement agree as follows:
1. Mountain Park Sewer Line Connection Into SARI Sewer. In consideration for
ICDC's performance of the obligations described in Section 2 below, OCSD agrees that the
City may establish and maintain a connection of the Mountain Park Sewer Line into the SARI
Sewer subject to obtaining OCSD Trunk Sewer Connection Permit(s), upon such terms and
conditions as OCSD may reasonably require, which Connection Permit(s) will not be
unreasonably withheld. The location of the connection shall depend on the timing of
completion of construction of the realigned portion of the Affected Segment and the needs of
the Development:
a. SARI Sewer Relocation to South Bank Alternative Completed First. If the
Affected Segment of the SARI Sewer has been relocated to the South Bank prior to the time
that the City or its agents desire to connect the Mountain Park Sewer Line to the SARI Sewer,
then OCSD shall issue a permanent OCSD Trunk Sewer Connection Permit upon such terms
30160-0171/359944.2 71T7106 Page 1 oN
v
and conditions as OCSD may reasonably require,including but not limited to conditions upon
the construction, operation and maintenance of the Mountain Park Sewer Line, and the
Mountain Park Sewer Line shall be connected into the relocated SARI Sewer at Connection
Point I as shown on Exhibit B to this Agreement.
b. Mountain Park Sewer Line Connection Prior to SARI Sewer Relocation. If
the Affected Segment of the SARI Sewer has not been relocated to the South Bank
Alternative or to any other location at the time that the City desires to connect the Mountain
Park Sewer Line to the SARI Sewer,then OCSD shall issue a temporary OCSD Trunk Sewer
Connection Permit upon such tams and conditions as OCSD may reasonably require,
including but not limited to conditions upon the construction, operation, and maintenance of
the Mountain Park Sewer Line,and City or its agents shall be allowed to connect to the SARI
Sewer at Connection Point 2 as shown on Exhibit B to this Agreement. The temporary
Mountain Park Sewer Line connecting to Connection Point 2 may be either a gravity siphon
undercrossing of the river or a lift station with force main attached to the Gypsum Canyon
Road Bridge as depicted on Exhibit B. OCSD may also require as a condition of the City's
temporary Trunk Sewer Connection Permit that City relocate or modify the Mountain Park
Sewer Line at no cost to OCSD in the event the relocation or protection in place of the
Affected Segment requires modifications or relocation of the Mountain Park Sewer Line or
its connection point with the SARI sewer line. After the relocation of the Affected Segment
of the SARI Sewer to the South Bank Alternative or other location is completed,OCSD shall
issue a permanent OCSD Trunk Sewer Connection Permit upon such terns and conditions as
OCSD may reasonably require, including but not limited to conditions upon the construction,
operation, and maintenance of the Mountain Park Sewer Line, and the Mountain Park Sewer
Line connection will thereafter be at Connection Point I, or if the Affected Segment is
relocated to another location, then to such other point as OCSD and the City agree is most
feasible. In the event the relocation or protection in place of the Affected Segment requires
modifications or relocation of the Mountain Park Sewer Line or of the connection point of the
Mountain Park Sewer Line, such modifications or relocation shall be completed pursuant to
plans approved and permits issued by OCSD and the City prior to commencement of
construction.
The connection of the Mountain Park Sewer Line under either of the above altematives shall
be completed at no expanse to OCSD and shall be made pursuant to plans approved and
permits issued by OCSD and the City prior to commencement of construction. No plan
check fee shall be charged by OCSD for its review of the proposed connection of the City-
owned Mountain Park Sewer Line under either of the alternatives described above. OCSD
may charge all other ordinary fees arising out of connection of such line.
2. ICDC Oblipations. In consideration for OCSD's agreement to allow the connection
of the Mountain Park Sewer Line to the existing or South Bank Alternative SARI Sewer,
ICDC agrees to perform the following:
a. Administration of Preliminary Enai neerine and Environmental Analysis. ICDC shall
retain and manage engineering and environmental services consultants (collectively, the
"Consulrante") approved by OCSD to prepare (i) the preliminary engineering feasibility
report for the relocation of the Affected Segment of the SARI Sewer to the South Bank
Alternative (the "Engineering Work"), and (ii) the portion of the EIR/SEIS describing the
301600171/358944.2 71nM PW20f4
biological resource impacts that will result from the relocation of the Affected Segment of the
SARI Sewer to the South Bank Alternative(the"Environmemai Work"). The purpose of the
Engineering Work will be to provide sufficient information to demonstrate the feasibility of
building a shallow-profile South Bank Alternative, and to provide sufficient information to
obtain approvals for permits and easements that will be needed for the new SARI Sewer
alignment from all landowners within the South Bank Alternative alignment. The purpose of
the Environmental Work will be to analyze and quantify the impacts of building the shallow-
profile South Bank Alternative and determine mitigation measures that may be appropriate.
All work performed by the Consultants shall be reviewed by and be subject to the approval of
OCSD, and OCSD shall not charge any plan check fees in connection with its review of the
Engineering Work and the Environmental Work. Any and all resulting work product shall be
made available for use by the OCSD as OCSD, in its sole discretion, determines is
appropriate, including submittal of copies of the work product to local, State, and Federal
agencies and interested parties.
b. ICDC Financial Obligation. ICDC shall pay the Consultants for their services in
performing the Engineering Work and the Environmental Work; provided, however, that in
no event shall ICDC be responsible for the payment of any amounts for the cost of such
consulting services (for both the Engineering Work and the Environmental Work) in excess
of Two Hundred Thousand Dollars($200,000.00). Subject to the foregoing limitation, ICDC
shall pay the Consultants in a timely manner for their services,and shall provide copies of all
contracts,invoices and payments to OCSD.
3. Term of Consultant Contracts. The parties agree that the contracts entered for the
performance of the Engineering Work and the Environmental Work shall each require that
the services up to the$200,000 maximum amount be completed within ninety(90)days from
the date of issuance of the Notice to Proceed to each Consultant.
4. Proiect Coordination. With respect to review of consulting services, plans for
connection of City's Mountain Park Sewer Line,and any other matters requiring coordination
of efforts or the implementation of this Agreement, OCSD designates Hardat Khublall,
telephone (714) 593-7377 (fax 714-964-4775)to act as its project representative, and ICDC
designates Terry Hartman,telephone(949) 720-2707 (fax 949-720-2692)to act as its project
representative. Either party may change its designated representative by providing ten (10)
days'prior written notice of same to the other party.
5. Authorization. OCSD and ICDC represent and warrant that this Agreement has been
duly authorized and executed and constitutes the legally binding obligation of their respective
organization or entity,enforceable in accordance with its terns.
6. Entire Agree n . This letter, together with the attachments hereto, constitutes the
entire agreement of the parties with respect to the subject matter contained herein, and
supersedes all prior agreements and understandings,whether oral or written.
If the above provisions accurately reflect our mutual understandings regarding the parties'
respective obligations regarding the matters described above,please sign the enclosed copy of
this letter and return it tome. Thank you for your cooperation.
3016MI71/3599442 70106 Pap3of4
Sincerely,
ORANGE COUNTY SANITATION DISTRICT
By:
James M.Ferryman
Chair, OCSD Board of Directors
ATTEST:
By:
Penny Kyle
Board Secretary
APPROVED AS TO FORM:
BRADLEY R. HOGIN,DISTRICT COUNSEL
By:
David Kendig
ICDC Concurrence
The terns of this Agreement are accepted and agreed to by the undersigned.
IRVINE COMMUNITY DEVELOPMENT COMPANY LLC
By:
Bryan Austin
Vice President,Community Development
By:
Mary K.Westbrook
Assistant Secretary
7e16MI71/3559442 71nro6 Page4 or4
lop
IL
d F( �t
d � L _ ;
�+�
E ��qt �a,�.j>l��i�t_.f-i{ � N 5 i..)', , �* �5� f, t
✓>S ♦ � II ���
rr
I M t
t
h ax IV��A
�x\ � �. � 43, �, '. STD➢ON �V�'� V' 1
24
MOUNTAIN PARK CONNECTION INTO SARI
EXHIBIT ---
.,xw,imwr
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Notice and Agenda for the Regular Board Meeting of Orange County Sanitation
District to be held on �- / , 2006, was duly posted for public inspection
in the main lobby of the Districts' offices on AuZe -2, . 2006.
ill
IN WITNESS WHEREOF, I have hereunto set my hand this /,� day of
2006.
Penny M. Kyle, Secrets
Board of Directors '
Orange County Sanitation District