HomeMy WebLinkAbout2006-03-22 ORANGE COUNTY SANITATION DISTRICT
March 15, 2006
plane:
l),41 9
622411 NOTICE OF MEETING
lu:
[11419620356
waa.aeal..
"llQ6;2; BOARD OF DIRECTORS
92721ey 2CA
7 ORANGE COUNTY SANITATION DISTRICT
WMC.Otl,.u:
16B44 6119 Avenue
`"" "70818-7 WEDNESDAY, March 22, 2006 - 7:00 P.M.
14eab.r
DISTRICT'S ADMINISTRATIVE OFFICES
•
title 10844 Ellis Avenue
Fountain Valley, California 92708
Anaheim
Brae
Buena Park
Lypre
Po"main Valley
`"'lar`an The Regular Meeting of the Board of Directors of the Orange Count Sanitation
,arose Brave 9 9 9 Y
Iwnung.n Baaeh District will be held at the above location, time and date.
Irvine
Le Habra
P L. alma
/Ins irn
orange
Sa.
er.Ane E16ard Secre} ry
Beal Beech
Stan.,
Tusu,
✓Ile Perk
y Linea STEERING COMMITTEE - Wednesday, March 22,2006 at 5:00 p.m.
County of orange
CIP WORKSHOP - Wednesday, March 29,2006 at 5:00 p.m.
smeltery matelot.
Cos. Mesa CUTS COMMITTEE -Wednesday,April 5, 2006 at 5:00 p.m.
M,Way Dry
PDC COMMITTEE -Thursday,April 6,2006 at 5:00 p.m.
Water oletrltc.
Irv,na Panch GWR SYSTEM STEERING COMMITTEE - Monday,April 10, 2006 at 5:30 p.m. @OCWD
LEGISLATIVE AFFAIRS -Tuesday,April 11,2006 at 8:00 a.m.
FAHR COMMITTEE -Wednesday,April 12, 2006 at 5:00 p.m.
STEERING COMMITTEE - Wednesday,April 26, 2006 at 5:00 p.m.
To maintain wuIltl ,'.aa la.da ah,in wastewater and ware,resource management
a
C7 p
BOARD MEETING DATES
April 26, 2006
May 24, 2006
June 28, 2006
*July 19, 2006
August 23, 2006
September 27, 2006
October 25, 2006
*November 15, 2006
*December 20, 2006
January 24, 2007
February 28, 2007
March 28, 2007
*Meetings are being held on the third Wednesday of the month
HAepbhAPubllc AHairs\320\BSWgendat2006 Meeting Nogces\MN03.2.dw
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE: 03/22/06 TIME: 7:00 p.m.
(SIMONIAN) .....................ANDERSON................... I
(YOST) .............................ANTOS ......................... G ��
(WILSON) ........................ BANKHEAD................... —
(AMBRIZ)..........................CAVECCHE...................JG / S=U9,9ES9�5 `�
(GARCIA)..........................CHRISTY.....................
(COLLINS)........................CRANDALL................... . � ✓ —_
(ROSEN)........................... DALTON....................... a� �sC
(KAWASHIMA) ................. DAVERT...................... v
(WINDER)........................ DUVALL...................... _ v
(UNDERHILL)................... ECKENRODE.................
�� ✓ —
(SCHAFER) ...................... FERRYMAN...................�t v —
(FAUTEUX)....................... FRESCHI .............. ..... �! ✓ —
(CHOI) .............................. KANG.......................... —
(SONDHI) ......................... LUEBBEN..................... .
(DOW)............................... MARSHALL.................. —
(REINHART)..................... MILLER ......................... —
(BEAUMAN)...................... MOORE........................ —_L —
(KIRKPATRICK-PILGER) . NEUGEBAUER.............. —
(DRISCOLL) ..................... PARKER....................... —
(WEBB) ............................ RIDGEWAY...................
�G ✓ _
(DONAHUE) .................... SHAWVER..................
(HERNANDEZ)................. SIDHU.......................... /
(CORREA)........................ SILVA........................... y v —
(COOK) ............................SULLIVAN......................✓ —
(RODRIGUEZ)..................WALDMAN.................... ✓ v —
STAFF:
Ghirelli >
MSFbeMo ✓
Kovac G ^
KyleLudwin
✓ /, �/l
Miles
Ruth
Tomko
Tyner /
OTHERS: ~ /fj�/14L—
in Ni
Nixon
02/23/06
H:MepMedminlBS\DIRECTOPoDimctore Roll Cell.dco
SIGN-IN SHEET
ORANGE COUNTY SANITATION DISTRICT
0 3 ,��16 BOARD MEETING
NAME ORGANIZATION/FIRM
leaseprint) leaseprint)
� c otal.e< C
b7 Av fa,d c
42
G
H.\WP.DTA�ADMIN\BS\FORMS\SIGN-IN FORM.DOC
Distributed at
L4 u�' D7e Board Meeting
n
March 17, 2006 Ja
MEMORANDUM
TO: Board of Directors
Orange County Sanitation District
FROM: James-D.-Ruth
Interim General Manager
Orange County Sanitation District
SUBJECT: March Status Report
The month of March has been a very challenging month with our major focus on our CIP
Program and the two year budget review with staff.
1. Budget Reviews
Departmental budget reviews have been completed. The General Manager and the
Finance department will continue our analysis to carefully scrutinize staffing and
operational needs over the next three weeks.
2. Capital Improvement Program
Based on input from the CIP Oversight Committee staff revisited our proposed CIP
program, carefully looked at each proposed projects scope, design, priority, impact on
operations and possibilities for deferment or elimination. As a result of this critical
analysis, Engineering was able to recommend a reduction of$474 million from the
proposed CIP program. This analysis was presented to members of the Board on March
15, 2006. A second meeting will be held on Wednesday, March 29.
3. CASA Conference Washington DC, March 6, 7 & 8
Board members Anderson, Ferryman, and Miller along with Bob Ghirelli and myself,
attended the CASA conference in Washington DC. Chairman Anderson and Board
members Ferryman and Miller did an excellent job of representing our interests with our
Legislative Delegation and Appropriations Committee staff soliciting support and funding
for the SARI line and our secondary treatment program.
4. Public Information Office
Our new Public Information Manager started work on March 13. Bret Colson brings an
excellent background and experience to our district and has already begun his evaluation
of our PIO operations and its strategic plan.
5. Meeting with County CEO on SARI Line
A meeting has been set with Tom Mauk, Orange County CEO, SAWPA staff, myself,
Dave Ludwin and Steve Anderson to discuss the roles and responsibilities of each
agency in the SARI line and how this project can be funded and to explore if costs can
be reduced. The meeting is scheduled for Thursday, March 23.
Board of Directors
Page 2
March 17, 2006
6. Performance Appraisal System
Excellent progress has been made on the development of a performance appraisal
system for management. The conceptual plan should be presented to the FAHR
Committee at their April 121° meeting.
7. Legislative Affairs Liaison
Recruitment for this position closes on March 24. Filling of this position will substantially
enhance our Legislative program.
8. Transfer Process Control Integration Unit to O & M
The transfer of this unit (12 employees and one manager)has been completed. The
transfer went very smoothly.
9. Succession Plan
HR staff is working with our EMT and Managers group to implement a succession plan
for OCSD. The plan is on schedule and will be presented to the FAHR Committee and
the Board prior to July 1, 2006.
10. Joint Campus, OCSD and OCWD
This concept has been under study for sometime. I have met with our new safety
manager, George Rivera and directed him to bring key staff members together from each
agency to explore the feasibility of such a proposal, do appropriate studies (security,
traffic control, costs)and bring back the results and recommendations prior to July 1.
11. Leadership Development
I have looked at various possibilities for a leadership development program here at
OCSD. A meeting with an outside consultant has been set for Thursday, March 23r°to
begin designing such a program for executive and middle management personnel.
12. SAWPA purchase of 4 million gallons per day(MGD) of additional treatment and
disposal capacity from OCSD
Staff has evaluated this request and agrees we can handle this additional capacity
without any negative impact. It is estimated that this capacity purchase will cost SAWPA
approximately 17 million dollars. This charge is a one time cost and is paid upfront.
Operating costs resulting from this increased capacity are recovered annually through an
O& M charge.
JDR:cs:gg
HWep1W1min111MLFFH JMIES1WWs Report XW61 =S JOR SUtus re rt memoto BoddM
Distributed at
73 1a dG Board Meeting
Orange County Sanitation District
MINUTES
BOARD MEETING
February 22, 2006
y SANITgT�oy
Q 9
O H
WW
HE
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
1
Minutes for Board Meeting o
Page 2
02/22/06 v
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was held on
February 22, 2006 at 7:00 p.m., in the District's Administrative Offices. Following the Pledge of
Allegiance and invocation the roll was called and the Secretary reported a quorum present as
follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Steve Anderson, Chair Steve Simonian
X James M. Ferryman, Vice Chair Arlene Schafer
X Charles Antos Paul Yost
X Don Bankhead Leland Wilson
X Carolyn Cavecche Steve Ambriz
X Alberta Christy Mike Garcia
X Larry Crandall John Collins
X Bill Dalton Mark Rosen
X Doug Davert Tony Kawashima
X Michael Duvall Jim Winder
X Norman Eckenrode Constance Underhill
X Richard Freschi Bob Fauteux
X Sukhee Kang Steven Choi
X Phil Luebben Lydia Sondhi
A Patsy Marshall Jim Dow
X Darryl Miller Douglas Reinhart
X Roy Moore John Beauman
X Joy Neugebauer Vivian Kirkpatrick-Pilger
X Ken Parker Catherine Driscoll
X Tod Ridgeway Don Webb
X David Shawver Brian Donahue
X Harry Sidhu Bob Hernandez
X Jim Silva Lou Correa
X Dave Sullivan Debbie Cook
X Mark Waldman Ralph Rodriguez
STAFF MEMBERS PRESENT: Jim Ruth, Interim General Manager; Penny Kyle, Board
Secretary; Nick Arhontes; Bob Ghirelll; Jim Herberg; Dave Ludwin; Patrick Miles; Lisa Tomko;
Lorenzo Tyner; Life Kovac; Jeff Reed; Layne Baroldi; Jeff Reed; Daisy Covarrubias; Mike
Moore; Mike Larkin; Paula Zeller; Simon Watson
OTHERS PRESENT: Brad Hogin, General Counsel; Larry Porter; Jan Vandersloot Rusty
Rustan; Irwin Haydock; Eileen Murphy; Mark Miller
Minutes for Board Meeting
Page 3
02/22/06
MOVED, SECONDED AND DULY CARRIED: Receive and file minute excerpts from the
following re appointment of active and alternate Directors, as follows:
City/Aoencv Active Director Alternate Director
Fountain Valley Larry Crandall John Collins
Newport Beach Tod Ridgeway Don Webb
Tustin Doug Davert Tony Kawashima
Villa Park Richard A. Freschi Bob Fauteux
Board of Supervisors Jim Silva Lou Correa
PUBLIC COMMENTS
The public requested their comments be made after the update on treatment costs and level of
treatment under the General Manager's report.
REPORT OF THE CHAIR
In the absence of Chair Steve Anderson, Vice Chair Ferryman reported on the Biosolids
Compost Workshop in Fountain Valley held on February 9' . He also reported that Chair
Anderson requested the Directors' attendance to one of two CIP Orientation Workshops
scheduled for March 15' and March 290.
REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, referred to the monthly status report included in the
Directors' meeting folders that identifies the major issues challenging the District.
Jim Herberg, Director of Operations and Maintenance, provided a presentation on the costs
associated with the levels of treatment to wastewater discharged to the ocean.
The following persons expressed support for the District to continue the current level of
treatment to the wastewater: Rusty Rustan; Jan Vandersloot; Larry Porter; Eileen Murphy; and
Irwin Haycock.
REPORT OF THE GENERAL COUNSEL
General Counsel Brad Hogin had no report.
APPROVAL OF MINUTES
The Chair ordered that the minutes of the regular meeting held January 25, 2006, be deemed
approved as corrected.
Minutes for Board Meeting
Page 4
02/22/06
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and "B", attached hereto and made a part of these minutes.
ALL DISTRICTS 01/15/06 01/31/06
Totals $15,960,672.83 $18,182,410.63
Director Cavecche abstained from discussion and voting on Warrant Nos. 77830 and 78010.
Director Davert abstained from discussion and voting on Warrant Nos. 77827 and 77991.
Abstentions were pursuant to California Government Code Section 84308.
CONSENT CALENDAR
9. No items considered.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE: A verbal report was presented by Vice Chair Ferryman re the
February 22, 2006 meeting.
Vice Chair Ferryman reported the Steering Committee was briefed on the meeting
between the General Manager and SAWPA. Nick Arhontes, Director of Regional Assets
and Services, reported on the SARI line breach and the repairs scheduled to be
completed the week of March 3, 2006.
Steering Committee Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Steering Committee
Minutes for the meeting held on January 25, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 1 to the
contract with James D. Ruth, Interim General Manager, extending the contract to
December 31, 2006; three weeks paid leave; and a $100,000 life insurance
policy.
Director Crandall opposed.
Steering Committee Non-Consent Calendar
No items were considered.
Minutes for Board Meeting
' Page 5
02/22/06
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE
OMTS Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Operations,
Maintenance and Technical Services Committee Minutes for the meeting held on
February 1, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Award a contract to V&A
Consulting Engineering, Inc. for Sewer Line Video Inspection Review Services,
Specification No. 5-2005-241, providing services for assessing the physical
condition of sewers from existing CCTV videotapes,for an amount not to exceed
$469,800.
C. Item pulled for discussion.
d. MOVED, SECONDED AND DULY CARRIED: (1)Authorize the General
Manager to participate in the Santa Ana Watershed Storrnwater Quality Task
Force project for reevaluation of water quality standards as they relate to storm
water and dry weather flows; and,
(2)Authorize an additional amount of$20,000 for a total amount not to exceed
$30,000 to the Santa Ana Watershed Project Authority (SAWPA), for
participation in Phases II and III of the project.
Director Cavecche opposed.
e. Item pulled for discussion.
Non-Consent Calendar
C. Approve Change Order No. 5 to Purchase Order No. 101758-OB for Purchase of
Cationic Polymer, Specification No. C-2003-143, issued to Polydyne Inc.,for a
unit rate increase of$0.70 per active pound for Solution Polymer increasing the
total price to $1.75 per active pound plus tax, and a unit rate increase in Mannich
Polymer of$0.249, increasing the total price to$1.529 per active pound plus tax,
for an estimated amount of$1,280,000 for the period July 1, 2006 through
June 30, 2007.
Staff was directed to review with legal counsel the purchase order terms and
conditions to define the legitimacy of this price increase and to resubmit to the
Board of Directors in March.
MOVED, SECONDED AND DULY CARRIED: That this item be continued to the
March 22, 2006 Board of Directors meeting for consideration.
e. In response to Directors' questions, Nick Arhontes, Director of Regional Assets
and Services, briefed the Board members on the limited services that would be
included in the agreement with the city of Placentia. The rates charged back to
the city will be fully-burdened and services would be provided on a pre-planned,
Minutes for Board Meeting
Page 6
02/22/06 r
scheduled basis without affecting the effectiveness of the Sanitation District's
collection systems.
MOVED, SECONDED AND DULY CARRIED: Approve a Reimbursement
Agreement with the City of Placentia for a two-year pilot project to assist the city
in improving their sewer system management program and operations and
maintenance, to achieve improved compliance with the Regional Water Quality
Control Board's Waste Discharge Requirements Order(WDR), in a form
acceptable to the General Counsel.
Director Bankhead opposed.
13. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE
PDC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Planning, Design and
Construction Committee Minutes for the special meeting held on January 26,
2006, and the regular meeting held on February 2, 2006,to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 6 to
Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk Improvements,
Contract No. 741; and City of Tustin Project Nos. 6106 and 6151 with ARB, Inc.,
authorizing an addition of$55.000 and five calendar days time extension,
increasing the total contract amount to $20,224,324.
C. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No. 11 to
Effluent Pump Station Annex, Job No. J-77, with J.F. Shea Construction, Inc.,
authorizing an addition of$100,302, increasing the total contract amount to
$44,393,556; and,
(2) Ratify Change Order No. 12 for an Adjustment of Engineered Quantities,
authorizing an increase of$138,502, increasing the total contract amount to
$44,532,058.
Director Davert abstained.
d. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 18 to
Bushard Trunk Sewer Rehabilitation, Job No. 1-24, with Steve P. Rados, Inc.,
authorizing a credit of$823,407 for deletion of work scope from the contract,
decreasing the total contract amount to$34,886,706.
e. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 25 to
Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37, with Margate
Construction, authorizing an addition of$116,822, increasing the total contract
amount to$72,088,850.
Minutes for Board Meeting
Page 7
° 02/22/06
f. MOVED, SECONDED AND DULY CARRIED: Approve a Professional Services
Agreement with Camp, Dresser& McKee, Inc. for engineering services for 66kV
Substation at Plant No. 1, Job No. P1-97, for an amount not to exceed $779,381.
g. MOVED, SECONDED AND DULY CARRIED: (1)Approve budget increase of
$96,000, increasing the total project budget to $3,172,000; and,
(2)Approve Amendment No. 1 to the Professional Services Agreement with M. J.
Schiff&Associates, Inc. providing for final design and construction support
services for Interplant Gas Line Rehabilitation, Job No. J-106,for an additional
amount of$119,147, increasing the total amount not to exceed $257,526.
h. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 2 to the
Professional Services Agreement with MWH Americas, Inc. to provide
construction support services for Rehabilitation of the Activated Sludge Plant at
Plant No. 2, Job No. 132-74, for an additional amount of$564,338, increasing the
total contract amount not to exceed $2,753,699.
I. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 5 to the
Professional Services Agreement with Lee & Ro, Inc., providing for additional
design engineering services for Replacement of the Bitter Point Pump Station,
Contract No. 5-49; Replacement of the Rocky Point Pump Station, Contract No.
5-50; Rehabilitation of the 10 Street Pump Station, Contract No. 5-51; and
Rehabilitation of the W Street Pump Station, Contract No. 5-52, for an additional
amount of$1,017,316, increasing the total amount not to exceed $4,480,816.
j. MOVED, SECONDED AND DULY CARRIED: Authorize the General Manager to
enter into a sole source agreement with Southern California Edison for the
procurement of a temporary power service connection at the intersection of Ellis
Avenue and Bushard Street in connection with Bushard Trunk Sewer
Rehabilitation, Job No. 1-2-4, for the duration of construction at the intersection,
for an estimated amount of$350,000.
k. MOVED, SECONDED AND DULY CARRIED: Approve time extensions to
Cooperative Project Contract Agreements: Contract No. 0403 with Costa Mesa
Sanitary District; Contract No. 0409 with Garden Grove Sanitary District; Contract
No. 0404 with the City of Fountain Valley; and Contract No. 0130 with the City of
Orange.
I. MOVED, SECONDED AND DULY CARRIED: Approve a budget amendment of
$1,511,800 for a total project budget of$3,810,376 for Realignment and
Rehabilitation of the Big Canyon Offslte Trunk Sewer, Contract No. 5-62.
Non-Consent Calendar
No items were considered.
Minutes for Board Meeting
Page 8
02/22M
14. FINANCE ADMINSTRATION AND HUMAN RESOURCES COMMITTEE
FAHR Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Finance,
Administration and Human Resources Committee Minutes for the meeting held
on February 8, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Receive and file report of General
Manager approved purchases in amounts exceeding $50,000 in accordance with
Board purchasing policies.
C. MOVED, SECONDED AND DULY CARRIED: Receive and file the FY 2005-06
Quarterly and Mid-Year Consolidated Financial Reports for the period ended
December 31, 2005.
Director Christy abstained.
d. MOVED, SECONDED AND DULY CARRIED: Approve the FY 2006-07 and FY
2007-08 Budget Assumptions and direct staff to prepare the FY 20D6-07—2007-
08 Budgets incorporating these parameters.
e. MOVED, SECONDED AND DULY CARRIED: (1)Approve a Purchase Order
Contract with Lance, Soil & Lunghard, Certified Public Accountants, as the
District's contracted internal auditors for FY 2005-06,for the period of March 1,
2006 through February 28, 2007, for an amount not to exceed $58,670,with an
option to renew the contract for two one-year periods based on approval by the
FAHR Committee; and,
(2) Direct Lance, Soil& Lunghard to perform speck internal auditing
assignments as the FAHR Committee deems necessary.
f. MOVED, SECONDED AND DULY CARRIED: Approve revised pricing with
Cambridge Integrated Services Group, Inc. for third-party administration of
Workers' Compensation as provided in Flat Fee Option B.
g. MOVED, SECONDED AND DULY CARRIED: (1)Adopt Resolution No.
OCSDD6-02, a Resolution of the Board of Directors of the Orange County
Sanitation District Authorizing the Execution and Delivery by the District of an
Installment Purchase Agreement, a Trust Agreement, a Standby Certificate
Purchase Agreement, a Purchase Contract and a Remarketing Agreement in
connection with the execution and delivery of Orange County Sanitation District
Certificates of Participation, Series 2006,Authorizing the Execution and Delivery
of such Certificates Evidencing Principal in an Aggregate Amount of Not to
Exceed $200,000,000, Authorizing the Distribution of an Official Statement in
Connection Therewith and Authorizing the Execution of Necessary Documents
and Certificates and Related Actions.
Director Christy abstained.
Minutes for Board Meeting
Page 9
02/22/06
FAHR Non-Consent Calendar
No items were considered.
15, CIP OVERSIGHT COMMITTEE
CIP Oversight Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order the draft CIP Oversight
Committee Minutes for the meeting held on February 9, 2006, to be filed.
Committee Chair Luebben provided a brief review of the complexities reviewed
by the Committee on the Capital Improvement Program, and encouraged all
Directors to attend one of the two workshops to be held on March 15 and
March 29, in order to consider several scenarios and make informed decisions as
they relate to the user rate increases.
CIP Oversight Non-Consent Calendar
No items were considered.
16. LEGISLATIVE AFFAIRS COMMITTEE
Legislative Affairs Committee Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Legislative Affairs
Committee Minutes for the meeting held on February 14, 2006, to be filed.
Legislative Affairs Committee Non-Consent Calendar
No items were considered.
17. GWR SYSTEM STEERING COMMITTEE
GWRSSC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Steering Committee Minutes for the meeting held on
January 9, 2006, to be filed.
GWRSSC Non-Consent Calendar
No items were considered.
Minutes for Board Meeting
Page 10
02/22/06
NON-CONSENT CALENDAR
18. MOVED, SECONDED AND DULY CARRIED: (1)Adopt Resolution No. OCSD 06-03,
Certifying the Initial Study/Negative Declaration for the College Avenue Pump Station
Rehabilitation Project, Contract No. 7-47, prepared by CH2MHill; and (2)Approve the
College Avenue Pump Station Rehabilitation Project, Contract No. 747.
19. MOVED, SECONDED AND DULY CARRIED: Consideration of the following actions
regarding environmental documentation required to modify the certified 1999 Strategic
Plan Final Program Environmental Impact Report(PEIR):
(a) Receive and file Addendum No. 8 to 1999 PEIR for the Bushard Trunk Sewer
Rehabilitation, Job No. 1-24, prepared by Environmental Science Associates;
(b)Approve a budget amendment of$2,000,000 increasing the total project budget to
$65,580,000;
(c)Approve Plans and Specifications for Bushard Trunk Sewer Rehabilitation, Job
No. 1-24A, on file at the office of the Board Secretary;
(d)Approve Addenda Nos. 1, 2, 3, 4, and 5 to the plans and specifications;
(e) Receive and file bid tabulation and recommendation; and,
(f)Award a construction contract to Mike Bubalo Construction Co., Inc. for Bushard
Trunk Sewer Rehabilitation, Job No. 1-24A, for an amount not to exceed $11,191,500.
20. Vice Chair Ferryman declared a recess of the Board of Directors of the Orange County
Sanitation District at 8:31 p.m.
ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION
ROLL CALL
A regular meeting of the board of Directors of the Orange County Sanitation District
Financing Corporation (OCSDFC) was called to order on February 22, 2006 at 8:32 p.m., in the
District's Administrative Offices. The roll was called, Director Christy removed herself from the
room, and the Secretary reported a quorum present as follows:
Minutes for Board Meeting
Page 11
02/22/06
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Steve Anderson, Chair Steve Simonian
X James M. Ferryman,Vice Chair Arlene Schafer
X Charles Antos Paul Yost
X Don Bankhead Leland Wilson
X Carolyn Cavecche Steve Ambriz
A Alberta Christy Mike Garcia
X Larry Crandall John Collins
X Bill Dalton Mark Rosen
X Doug Davert Tony Kawashima
X Michael Duvall Jim Winder
X Norman Eckenrode Constance Underhill
X Richard Freschi Bob Fauteux
X Sukhee Kang Steven Choi
X Phil Luebben Lydia Sondhi
A Patsy Marshall Jim Dow
X Darryl Miller Douglas Reinhart
X Roy Moore John Beauman
X Joy Neugebauer Vivian Kirkpatrick-Pilger
X Ken Parker Catherine Driscoll
X Tod Ridgeway Don Webb
X David Shawver Brian Donahue
X Harry Sidhu Bob Hernandez
X Jim Silva Lou Coffee
X Dave Sullivan Debbie Cook
X Mack Waldman Ralph Rodriguez
STAFF MEMBERS PRESENT: Jim Ruth, Interim General Manager; Penny Kyle, Board
Secretary; Nick Arhontes; Bob Ghirelli; Jim Herberg; Dave Ludwin; Patrick Miles; Lisa Torni
Lorenzo Tyner; Lilia Kovac; Jeff Reed; Layne Baroldi; Jeff Reed; Daisy Covarrubias; Mike
Moore; Mike Larkin; Paula Zeller; Simon Watson
OTHERS PRESENT: Brad Hogin, General Counsel; Larry Porter; Jan Vandersloot; Rusty
Rustan; Irvin Haycock; Eileen Murphy; Mark Miller
APPROVAL OF MINUTES
The Vice Chair ordered that the minutes of the regular meeting held June 22, 2005, be deemed
approved, as written.
Minutes for Board Meeting
Page 12
02122/06
REPORT OF THE DIRECTOR OF FINANCE
Lorenzo Tyner, Director of Finance, reported that the Financing Corporation Board is required to
meet annually.
MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. FC-03, Authorizing the
Execution and Delivery by the Corporation of an Installment Purchase Agreement and a Trust
Agreement in connection with the execution and delivery of Orange County Sanitation District
Certificates of Participation, Series 2006;Authorizing the Execution and Delivery of such
Certificates Evidencing Principal in an Aggregate Amount of Not to Exceed $200,000,000 and;
Authorizing the Execution of Necessary Documents and Cer fcates and Related Actions..
ADJOURNMENT: The Vice Chair declared the meeting of the Orange County Sanitation
District Financing Corporation adjourned at 8:35 p.m.
23. Reconvene, Board of Directors, Orange County Sanitation District.
24. There was no closed session.
25. Director Miller suggested further discussion on the Sanitation District's regional activity
on watershed operations.
ADJOURNMENT: The Chair declared the meeting adjourned at 8:36 p.m.
Penny M. Kyle 0
Secretary to the Board of Difectors of
Orange County Sanitation District
H:WepOapenda1Bwrd Mlnutw'2006 Boa,d Minutn=2206 minutes.doc
Claims Paid From 01/01/06 to 01115/06
Warrant No. Vendor Amount Description
Accounts Payable-We.
77709 Metlife Ule Insurance Company S 36,505.17 Group Life,Manager Add'I.Life,Short&Lang-Term Disability 8 Optional Term Life Ins.
77710 PloneerAmedcas,Inc. 35,74266 Sodium Hypochlodle
77711 Suftchoice 105,901.31 Software-Microsoft Enterprise Desktop
77712 Southern California Edison 53,925.54 Power
77713 Teksystems 26,129.80 Temporary Employment Services
77714 WoodmOSpradlm&Smart 27,760.14 Legal Services MO 7-26-95
T1715 Blake Anderson 32.62 Mee6ngrrmining Expense Reimbursement
77718 Accounting Options.Inc. 4.236.00 Temporary Employment Services
77717 Americen FildeHly Assurance Company 344AO Employee Cancer Insurance
77718 Added,Elevator Services 1,400.00 Monthly Elevator Maintenance at Put.1 &2
77719 Appleone Employment Service 17,791.78 Temporary Employment Services
77720 Keith Boger 870.00 Training Registration
77721 Basic Chemical Solutions,L.LC. 7,738.42 Sodium Sisul6te&Sodium Hydroxide
77722 Black&Vealch Corporation 6.901.16 Engineering Services J-71-3
77723 Blue Martin Group 1,356.24 Boat Parts&Supplies
M24 California Coastal Coalition 1.000.00 Membership
77725 COW Trustee 454.49 Wage Garnishment
77726 CiigularWreless Airtime 473A3 Wireless Services
77727 City of Huntington Beach 14,324.04 Water Use
77728 City of Newport Beach 76.07 Water Use
77729 Compressor Components of California 4.765.00 Repair&Maintenance Services-(32)P4ot Fuel Valves
77730 Consumers Pipe&Supply Co. 1,791.62 Phonbing Pads&Supplies
77731 Corelink Staffing Services,Inc. 2,469.28 Temporary Employment Services
77732 County of Orange 150.00 Wage Garnishment
77733 County of Orange Auditor Controller 910.00 Encroachment Permits 741
77734 County of Orange Auditor Controker 437.50 Encroachment Permits 241-04
7715 CWEA 2002 Annual Conference 180.00 Membership(California Water Environment Association)
77736 Del Mar Analytical 653.O1) Analysis of Biosolids
77737 Department of Child Support Services W0.00 Wage Garnishment
77738 Edinger Medical Group.Inc. 7,310.00 Medical Screenings
77739 Electra Bond,Inc. 1.578.64 Repair&Maintenance Services-Fusion Bond Coating to Pump Pads
77740 Employee BeneNs Specialists,Inc. 10,562.46 Reimbursed Prepaid Employee Medical&Dependent Care
T7741 Court Order 445.00 Wage Garnishment
77742 ESRI,Inc. 1,626.96 Software-NT-Intel Windom
M43 Franchise Tax Board 50.00 Wage Garnishment
77744 Fuller Truck Accessories 1.857.68 Truck Pads&Supplies
77745 Gold Coast Awards,Inc. 25A7 Name Badges
77746 Home Depot 388.70 Misc.Repair&Maintenance Material
77747 Hope He0ftWIHAC 531.86 Wellness Newsletters
77746 Internal Revenue Service 125.00 Wage Garnishment
77749 In0.Union of Oper.Eng.AR CIO Local 501 4,694.12 Dues Deduction
77750 Iron Mountain 101.25 Storage Fee-BM Document PI-37
77751 Kelly Paper 830.75 Paper
77752 Voided Check -ard 00 -
77763 C Order 150. Wage Garnishment
M54 Marveranual Michel Financial Group 146.41 Executive Disability Plan Premium
77755 Material and Contract Services 13.392.00 Temporary Employment Services
H?MpYPn`F%CELEne14]WJSFWiEKIBImf Peld RepwmeWs3one Me Report-01-1S06 EXHIBIT A
dNlneld Page 1 of 8 Dim.
Claims Paid From 01101106 to 01/16/08
Warrant No. Vendor Amount Description
77756 Court Ober 225.00 Wage Garnishment
77757 NATEC International.Inc. 396.00 Training Registration
77758 National Bond&Trust 2,482.01 U.S.Savings Bonds Payroll Deductions
77759 OCB Reprographics 5,017.91 Printing Service-MO 1126100
77760 OCEA 650.54 Dues Deduction
77761 Orange County Sheriff 85.00 Wage Garnishment
77762 Oxygen Service Company 228.40 Specially Gases
77763 Peace Officers Council of CA 1,593.00 Dues Deduction,Supervisors&Professionals
77764 Ascom Hasler Meiling Systems 262.14 Software Maintenance-Mail Manager Intell8ouch System
77765 Pali Supply 18.09 Life Vest Kit
77766 Pre Paid Legal Services.Inc. 574.00 Employee Legal Service Insurance Premium
77767 Progressive Business Compliances 124.41 studero-Labor Law
77768 Reinder Bankers Security Ufe Ins. 8,395.30 Voluntary Life Ins.,Cancer Ins.&Supplemental Shod-Term Disability Ins.
77769 Ricoh Business System 16.18 Color Copier Lease
77770 Rudolph H.Stolz 500.00 Training Registration
77771 SARBS-CWEA 90.00 Plant 2 Operations Division Meeting Registration
77772 SBC 973.72 Telephone Services
77773 SBC/MCI 1,401.84 Telephone Services
77774 Science Applications Intl.Corp. 16,353.77 Ocean Monitoring MO 6-8-94
77775 Smardan Supply Company 463.10 Plumbing Pads&Supplies
7T776 Count Order 721.50 Wage Garnishment
77777 Snap On Tools,Ina 1.246.59 Tools
77778 South Coast Air Quality Mgml.Dist. 57.63 Training Registration
77779 Summit Steel 1,083.31 Metal
77780 Thompson Industrial Supply,Inc. 987.64 Mechanical Parts&Supplies
R781 Time Werner Communication 51.07 Cable Services
77782 Townsend Public Affairs 5,000.00 Legislative&Executive Advocate for Grant Funding
77783 United Way 195.00 Employee Contributions
77784 Vert=California 76.66 Telephone Services
77785 Wastewater Technology Trainers 970.00 Training Registration
77785 WEF 139.00 Membership-Water Environment Federation
77787 Weafem City 381.00 Notices&Ads
MOB Xerox Corporation 17,926.80 Copier Leases&Managed Services
77789 Xyon Business Solutions,Inc. 18.180.00 Temporary Employment Services
77790 Court Order 597.50 Wage Garnishment
77791 Juan J.Ambdz 55.00 MeetingRreining Expense Reimbursement
77792 Kenneth W.Aplon,Jr. 130.00 Meeling7Training Expense Reimbursement
77793 Deirdre E.Singman 182.00 MeelingfTraming Expense Reimbursement
77794 Damn L.Caren 97.00 Meelingffralning Expense Reimbursement
77795 Carolyn V.Cawroche 246.78 MeelingtTraining Expense Reimbursement
77796 Michael D.Duvall 314.78 Meeting/Training Expense Reimbursement
77797 Richard Gallegos 195.00 Meeling/Training Expense Reimbursement
77798 Sonja Wasagren Mogan 789.38 Meeling/Tri fining Expense Reimbursement
77798 Roy J.Reynolds 180.89 Meeting/Training Expense Reimbursement
77800 Jeremy J.Saum 817.76 Meesngfriaining Expense Reimbursement
77801 Cud V.Shelia 170.00 MeetingRmining Expense Reimbursement
77802 Patrick A.Sullivan 170.00 Meetin9ffraining Expense Reimbursement
T7803 James G.Tinlle 58.00 MeetingRreining Expense Reimbursement
H wapMn*XCEL.4n1220v PSaIkRMlalms Pas Repm0l)"nClelma Pete Report-al-imps EXHIBIT A
nn,210 k Page 2 of 8 vlod6ce
Claims Paid From 01/01/06 to 01115/09
Warrant No. Vendor Amount Description
77804 David M.Yager 101.00 Meetingirfraining Expense Reimbursement
77805 EOUISERV 4,295.00 Emission Inspection Correct-SMOG Program&Emissions Testing
77800 South Coast Air Quality Mgmt.Dist. 131.05 Employee Commute Reduction Plan Amendment Fee
77807 Ashbrook Corporation 32,990.23 Mechanical Paris&Supplies
77808 Black It Veatch Corporation 720,521.76 Engineering Services J-102,558,J-77&Pt-102
77809 Brown&Caldwell 73,273.77 Engineering Services P2-91
77810 Carollo Engineers 115,606.19 Professional Services P2-8D
77811 City of La Habra 144,980.45 Cooperative Projects-Sanitary Sewer Master Plan
77812 GHD,L.L.C. 60,041.60 Professional Services SPS8-2
77813 Kemimn Companies,Inc. 81,257.78 Ferric Chloride
77814 Lewis&Zimmerman Associates,Inc. 26,580.02 Professional Services P2-90
77815 Malcolm Pima,Inc. 129,615.19 Professional Services 11-26&J-110
77816 Midway City Sanitary District 371,200.00 Cooperative Projects-Urgent Repairs&Improvements
77817 NALCO Company 30,086.55 Anionic Polymer
T7818 National Assoc,of Clean Water Agencies 30,543.00 Membership
T7819 Occidental Fmgy Marketing,Inc. 55.383.06 Natural Gas for CerGen/COGen
77820 Orange County Water District 78,274.68 GAP Water Use
77821 Pioneer Americas,Inc. 206,376.97 Sodium Hypochlonte
77822 Polydyne,Inc 56,527.91 Cationic Polymer
77823 Sancen Engineering,Inc. 108.140.00 Construction-Manhole Rehabilitation Project
77824 Tule RancluMagan Fames 275,809.27 Residuals Removal MO 349-95
77825 US Peroxide,L.L.C. 121,17727 Odor&Corrosion Cod.Treatment for Call.Sys.;Hydrogen Peroxide&Ferrous Chloride
77828 Denboer Engineering&Construction 188,550.00 Construction P2-66-3
77827 J F Shea Construction,Inc. 6,520,902.74 Constitution P2.66,J35-2&J-77
77828 J R File=Construction 1,769,757.70 Construction P1-76&P1-82
77629 Margate Construction,Inc. 905,390.00 Consorucimn P1-37
77830 Morrow Meadows Corp. 130,312.00 Construction P247-3
77831 Shoals Electric,L.P. 207,098.00 Constucion SP-94
77832 Southern Contracting Company 101,422.00 Construction J-33-1
77833 Toney Pines Bank 42,295.00 Construction P1-76,Retention
77834 A Plus Notary Seminars,L.L.C. 138.00 Training Registration
77835 ABATIX Environmental Corp. 253.83 Lead-Specific Detergent
77836 ASS Automation,Inc, 665.00 Repair&Maintenance Services-Transmitter
T7937 Absolute Standards,Inc. 65.00 Lab Pads&Supplies
77838 Accounting Options,Iry 3.662.00 Temporary Employment Services
77839 ACCU Sludge 372.65 Lab Parts&Supplies
77840 Advance Business Graphics 1,463.50 Printing Services-Forms
T7841 Anger Safety.Inc. 12,463.18 Safety Supplies
T7842 Allied Packing&Rubber,Inc, 7229 Tubing
77843 Allsleel,Inc.rlo Interservice 9.240.10 Installation of ONce Work Stations&Furniture-Division 860
77844 AMTECH Elevator Services 2,700.00 Monthly Elevator Maintenance at Pits.1 &2
77545 Analytical Products Group,Inc. 695.00 Lab Parts&Supplies
77MB Appleore Employment Service 9,350.13 Temporary Employment Services
77847 Applied Industrial Technology 49120 Mechanical Parts&Supplies
771148 Aquarium Doctor 110.83 Human Resources Aquarium Service
77849 Aquatic Bioassay And Consulting Labs,Inc. 1.570.00 Bioassay Testing&Whole Effluent Toxicity Testing
77850 Arch Wireless 630.61 Paging Service-Airtime,Service&Equipment
77851 Aurora Pictures,Inc 431.00 Safety Videos
H.MepronvEXCEL4WUtl PSHARE Imo Pas ReporM,5-0 elmms Paid Report-01-1S06 EXHIBITA
fi.lwa Page 3 of 8 V1042e05
Claims Paid From 01101106 to OiI15106
Warrant No. Vendor Amount Description
77852 Awards&Trophies Company 99.78 Awards&Trophies
77853 AWSI 166.00 Department of Transportation Program Management&Tesling
77854 Joyce Bristow 826.43 User Fee Refund Regarding Septic Tanks
77855 Baker Tanks 1,492,00 Tank Rentals
77856 Basic Chemical Solutions,L.L.C. 16,181.41 Sodium Bisulfite&Sodium Hydroxide
77857 Battery Specialties 963.41 Batteries
771158 BMC Business Machines Comultaids,Inc. 1,914.72 (1)Stooling Slacker for HP9000 Multifunctional Copier/Scanner
7785D Bush&Assocalas,Inc. 12,420.00 Professional Services 1-96,7-36&741
77860 City of Huntington Beach 11,949.75 Cooperative Projects-HomIOon/Bannirig Tributary Area Sewer Study
77861 California Recreation Company 2,596.43 Boat Slip Rental Fees for Ocean Monitoring Vessel Nerissa
77852 California Relocation Services,Inc. 300.00 Office Files MovinglRelocation Services
77863 CAPPO Conference Registration 775.00 Purchasing Meeting Registration
77864 Ce112Ce11 252.69 Phones&Accessories
77866 CEM Corporation 386.58 Lab Parts&Supplies
77866 Cale Power Instrument Co. 640.38 Lab Parts&Supplies
77B67 Compressor Components of California 1.248.00 Repair&Maintenance Services-(32)Coils LSV13 Ignition
T7866 Conrad&Associates,L.L.P. 17.256.O0 Professional Services-Financial Auditing Services
77869 Consolidated Elect.Dlstribulors,Inc. 460.35 Electrical Parts&Supplies
77870 Consumers Pipe&Supply Co. 421.18 Plumbing Parts&Supplies
77871 Controlled Motion Solutions 1,051.87 Electrical Parts&Supplies
77872 Cooper Cameron Corporation 325.10 Engine Supplies
77873 Corporate Business Intedors 11.160.02 Miscellaneous Office Furniture
77874 Corporate Express 3,874.65 Office Supplies
77875 Comorale Image Maintenance,Inc. 160.00 Custodial Services Spec.No.9899-09
77876 Counterpart Enterprises,Inc. 5,830.67 Mechanical Parts&Supplies
778T7 County Wholesale Electric Co. 2,002.84 Electrical Pads&Supplies
77878 CSMFO Annual Conference 760.00 Accounting Division Meeting Registration
77879 CWEA 2002 Annual Conference 165.00 Training Registration(Calsomla Water Environment Association)
77880 CWEA Membership 825.00 Training Registration(California Water Environment Association)
77881 CWEA Specialty Conference 505.010 Training Registration and Environmental Science Lab Division Meeting Registration
77882 Dapper Tire Co. 5,130.73 Truck Time
77883 Devise Tree Service 8,495.00 Tree Maim.Service
77554 Del Mar Analytical 8,081.00 Outside Lab Services
77885 Desert Pumps&Pans.Inc. 15,446.56 Pump&Pump Pens&Supplies
77885 Detection Instruments Corporation 497.54 Instrument Paris&Supplies
77887 Dezudk Water Controls 489.57 Plumbing Paris&Supplies
naafi DGA Consultants,Inc. 6,685.76 Professional Services-CCTV Data Evaluation&Support
77869 DHL express USA,Inc 21.39 Freight Services
77890 Dresser-Rend 118.68 Mechanical Pads&Supplies
77891 Dunn Edwards Corporation 106.46 Point Supplies
77882 Ecology Control Industries 2.951.02 Hazardous Waste Disposal
77893 Electronic Data Solutions 62.22 Lab Pans&Supplies
77894 Enchanter,Inc. 1.700.00 Ocean Monitoring&Curtail Inspection&Maintenance
77a96 Environmental Compliance Inspection 1,040.00 Professional Services-Grease Interceptor Inspections-FOG
77896 EVAng Irrigation Industrial 197.34 Landscape Irrigation Pads&Supplies
77897 Full Spectrum Anayfics 633AD Instrument Repair&Maintenance Services
77898 Farvresl Corrosion Control Co. 3,873.62 Instrument Paris&Supplies
77899 Fllledine Corporation 110.96 Filled,
Hweptkfir EXCEL.InQ2MPSHARBOalms Pmd Repmd &Ga Iel—Pete RePon-of-15-H EXHIBIT
G.Mm Page 4 of 8 ano fi as
Claims Paid From 01/01/06 to 01115108
Warrant Ho. Vendor Amount Description
77900 Fisher Scientific 10,509.27 Lab Park&Supplies
77901 Foodcra8 Coffee&Refreshment Sendces 1.377.50 Meeting Supplies
77902 Fountain Valley Paints,Inc. 122.19 Paint Supplies
77903 Franklin Covey 376.37 Office Supplies
77904 Freida Profiles 592.00 Human Resources Background Checks
77905 Garland Manufacturing Co. 455.14 Mechanical Pads&Supplies
77906 GarrsB Callahan Company 2,570.50 Chemicals
77907 DEC General Binding Corp. 40.40 Office Supplies
77908 Gerhardls,Inc. 3,711.98 Spark PlugsILSVB Engine
77909 Golden State Water Company 74.19 Water Use
77910 Goldenwest Window Service 440.00 Landscape Maintenance
77911 Grainger,Inc. 2,226.11 Mechanical Paris&Supplies
77912 Haaker Equipment Company 4,323.66 Misc.Vehicle,Pads,Repeim&Service
77913 Hach clo Ponlon Industries 127.32 Mechanical Paris&Supplies
77914 Harold Primrose Ice 120.00 Ice For Samples
77915 Harrington Industrial Plastics,Inc. 750.78 Plumbing Supplies
77916 Hatch&Kirk,Inc. 2,497.34 Truck Supplies
77917 Hi Standard Aulomelive 1,297.05 Aulomothm Pads&Supplies
77916 Hill Brothers 23,813.44 Chemicals-Odor&Corrosion Control-Newpad Tmnkline
77919 HII Inc. 1,308.42 Hardware
77920 Home Depot 1,286.02 Misc.Repair&Maintenance Material
77921 Horizon Technology 3,791.08 Lab Pads&Supplies
77922 Hose Express,L.L.C.dbe Pines Santa Ana 2,808.41 Mobile Hose Service
77923 Hub Auto Supply 1,182.66 Vehicle Pads&Supplies
77924 City of Huntington Beach 31.02 Water Use
77925 HWA Sales 2,213.55 Electdcal Pads&Supplies
77926 Industrial Distribution Group 780.73 Tools&Supplies
77927 Intereervice,TFS,Inc.clo SFI Warehouse 2,426.96 Office Furniture-(3)Freedom Chairs
77928 Interstate Batteries of Cal Coast 1,596.43 Ballerms for Vehicles&Cane
77929 Invensys Systems,Inc. 5,760.44 Electdcal Pads&Supplies
77930 Ironman Pans&Services 27.00 Air Conditioner Fillers
77931 J&L Industrial Supply 747.53 Tools
77932 J R Fllanc Consfuchon 15,395.10 Repair&Maintenance Services-Media Packing of(18)Scrubbers at Pits. 1&2
77933 Jamison Engineering Contractors,Inc. 7,100.00 Repair&Maintenance Services-Water Leak&Sub-Flooring at Pit.2 Const.Trailer
77934 Jaya Catering 1.776.95 Meeting Expenses
77935 JPR Systems,Inc. 637.22 Gas Liquid Separator
77936 Keith Boger 375.00 Training Registration
77937 Kleinfelder,Inc. 2,114.00 Soils,Concrete&Other Materials Testing
77938 KnoWedge Point 4,620.00 ScBware Mainl.
77939 Jerry Linkhad 1,017.81 User Fee Refund Regarding Septic Tanks
77940 Lab Safety Supply,Inc. 163.32 Lab Safety Supplies
77941 LECO Corpomlion 14,115.26 Instrument Repair &Maintenance Services-Pegasus SIN 3144
77942 Lae&Ro,Inc. 20,862.05 Professional Services 5-51&532
77943 Litecom Safety,Inc. 1,021.73 Specialty Gases
779" LINJER 5,442.39 Professional Service-DART MO 9-22-99
77945 Luocrs Gourmet Foods,Inc. 172.93 Meeting Expanse
77946 Lustre Cal 726.48 Wasteheuler Decal Stickers
77847 Maintenance Technology Corp. 221 M Mechanical Pads&Supplies
H`4epMnT.CEL EIn1I WGHARE1Clel—Peld RapyM00AC41ms paid Rmon-0l-late EXHIBIT A
nnni m Page 5 of 8 21wsme
Claims Paid From 01/01/06 W 01115MG
Warrant No. Vendor Amount Description
77948 Mandic Motors 75.00 Towing Services
77949 Material and Contract Services 4.464.00 Temporary Employment Services
7795D MBC Applied Environmental Sciences 3,191.34 Professional Services-Kelp Beds Aerial Survey
77951 McMaster Can Supply Co. 3,977.38 Mechanical Parts 8 Supplies
77952 Meinhard Glass Products $46.00 Lab Parts 8 Supplies
77953 Mesa Products,Inc. 1,055.15 Instrument Parts 8 Supplies
77954 Mine Safety Appliances Company 1,376.51 Electrical Pads 8 Supplies
77955 Motion Industries,Inc.CA 55 270.02 Electrical Pans 8 Supplies
nSSS MM Americas,Inc. 11,905.41 Professional Services P2-74
77957 NACE International 140.00 Membership
77958 National Plant Services,Inc. 14.157.84 Vacuum Thick Services
77959 Neal Supply Co. 640.84 Plumbing Supplies
77960 Nerversant of Southern California 11.146.80 Security System Mainlenance
77901 New Harizons C.L.C.of Santa Are 845.00 Training Registration
77962 Office Depot Business Services DM. 1,792.97 Office Supplies
77983 Omega Industrial Supply,Inc. 1,132.28 JanBorial Supplies
77964 Onesource Distributors,Inc. 563.69 Electrical Pads A Supplies
77965 Oracle Corp. 4.928.62 Training Reg.B Software Support Renewal-Oracle Enterprise B Internet Developer
77966 Orange County Sanitation District 15,303.86 Worker's Comp.Reimb.
77967 Orange County Peal Control,Inc. 278.00 Pest Control
77868 Orange County Vector Control District 122.34 Pest Control
77969 Orange Fluid System Technologies,Inc. 392.09 Plumbing Pads 8 Supplies
77970 Oxygen Service Company 4.145.83 Lab Specialty Gases
77971 PAC 1,089.40 Lab Papa 8 Supplies
77972 Pacific Mechanical Supply 2.757.14 Plumbing Pena B Supplies
77973 Parker Supply Company 682.99 Mechanical Pans B Supplies
77974 Parkhouse Tire,Inc. 209.31 Time
77975 Pertnela Consulting Services 8.207.00 FIS On-Site Support-Help Desk
77976 FOG Industries 11,225.00 Repair 8 Maintenance Services-Refurbish 8 Chrome(2)Mono-Flo Pump Rolors
77077 PCS Express,Inc. 122.00 Courier Service
77978 Pemreseal 44925 Lube Oil
77979 Pia Rivera Pallet Inc. 2,648.50 Repair 8 Maintenance Materials-(200)Pallets
77980 Pnxelr Distribution,Inc. 16.30 Demurrage
77981 Praxae,Inc. 417.95 Lab Pads 8 Supplies
77982 Primary Source Office Furnishings,Inc. 660.51 Office Furniture
77983 Proare Work Injury Center 124.25 Medial Screenings
77984 Propipe 12,061.16 CCTV Sewedine Inspections
77985 Prudenlial Overall Supply 4.821.59 Uniform;B Related Articles
77986 Guinn Power System Assoc. 3.304.32 Repair 6 Maintenance Sam.-Prepare Caterpillar Generator for Long-Term Storage
77987 R L Abbott 8 Associates 3,0D0.00 Kem County Biosalids Consulling Services
77988 Rainbow Disposal Co. 2,973.12 Trash Removal
77989 Rainin Instrument,L.L.C. 194.68 Lab Instrument Repairs
77990 Raven Biological Laboralories 98.87 Lab Pads 8 Supplies
77991 RSF Engineers 8,784.96 Professional Services 7J8
77992 Red Wing Shoes 428.60 Safety Shoes
77983 Registrar Air S Waste Management Assoc. 165.00 Membership
77994 RMS Engineering 8 Design,Inc. 3,125.00 Professional Services P266.3
77995 RTM Lighting S Electronics,Inc. 4,223.80 Electrical Parts 8 Supplies
H WepMNE%CEL 1aU20APSHMMI81ms Paid Report960TCI—s Paid Report-01-15-08 EXHIBIT A
finNlM Page 6 of a zh aSJa
Claims Paid From 01/01/08 to 01115106
Warrant No. Vendor Amount Description
77996 SARBS-CWEA 290.00 Training Registration
77997 SBCIMCI 736.70 Telephone Services
77998 Song Associates 6,020.82 Professional Services J-105&P2-66
77999 Schwing America,Inc. 3.142.07 Pump Pads&Supplies
78000 Science Applications Ing.Corp. 17.619.49 Ocean Monitoring MO 6.8-94
78001 Swing Voice&Data,Inc. 2,284.80 Telephone System Maintenance
78002 Sea Bird Electronics,Ina 417.00 Lab Equipment Maintenance&Calibration Services
78003 Seavisual Consulting,Inc. 20.430.00 Professional Services-Strategic Process Studies
780D4 Shamrock Supply Co.,Ills. 83.90 Concrete Mi.&Hand Cleaner
78005 Sigma Aldrich,Inc. 299.38 Lab Pads&Supplies
78006 Smith Pipe&Supply 328.22 Landscape Irrigation Supplies
78007 Snap On Tools 105.0D Taale
78008 Soflctlolce Corp. 408.16 Sofiwere
78009 Southern Califomie Edison 5,579.94 Power
78010 Southern Counties Lubricants 3,952.95 Hydraulic Oil
78011 Sparklegs 1.753.12 Drinking WaterlCooler Rentals
78012 Spec Services,Inc. 17,845.00 Engineering Services 141i1
78013 Summit Steel 3,521.73 Metal
78014 Sucaol Industrial Pads 1,945.97 Mechanical Pads&Supplies
78016 Technical Service Group,Inc. 1,381.60 SCADA System VAX Service Agreement
78016 George Tibbetts 1,437.79 User Fee Refund Regarding Septic Tanks
78017 Teksystems 2.337.00 Temporary Employment Services
78015 Teledyne RD Instruments,Inc 1,163.70 Battery Pecks
78019 Tenminia International 1,954.DD Past Control
78020 Centre for Organization EBectiverws 1,575.DD Professional Services-Guttural Assessment Organizalional Improvement Project
78021 The Orange County Register 108.61 Notices&Ads
78022 Thermo Electron Corp. 1.410.22 Lab Pads&Supplies
78023 Thompson Industrial Supply,Inc. 2.563.61 Mechanical Pads&Supplies
78024 TMobib 111.31 Wireless Services
78025 Tonys Lock&Safe Service&Sales 249.13 Lacks&Keys
78026 Traffic Control Service,Inc. 815.3D Traffic Safety Equipment
78027 Truck&Auto Supply,Inc. 1,095.16 Aulomoave Supplies
78028 US Filter Corp. 1,593.00 Service Agreement-DI Water System at Ph.1 &Pit.2
75029 ULme 186.73 Truck Pads&Supplies
78030 Underground Service Aled of So.Calif 1,474.05 Membership-Underground Utility ldemificatlonlNatificelion Service
78031 The Unisource Corporation 10,307.67 Office Supplies
78032 United Pacific Services.Inc. 11.316.99 Landscape Maintenance at Plants 1&2 and Pump Stations
78033 United Parcel Service 140.77 Parcel Service
78034 United Pumping Service 4,068.21 Pumping Service
78035 US Almonditioning Distributors,Inc. 856.61 Motor
78036 US Equipment Co.,Inc. 1.363.87 Coolant
78037 Vemes Plumbing 550.0D Service Contract-Backlow Device RepairefReplacement
78038 Vortex Corp. 1.404.24 Door Regain,-Warehouse Roll-Up Door
78039 VWR Sclenllfic Products 782.32 Lab Pads&Supplies
78040 The Wackenhut Corporation 11.954.93 Security Guards
78041 Wally Machinery and Tool Supply,Inc. 167.01 Mechanical Pads&Supplies
78042 Waste Markets Corp. 16,553.93 Maint.Agree.-Grit&Screenings Removal&Digester Mall Removal
78043 Wastewater Technology Trainee 2.690.00 Twining Registration
HU,surE%CEL.d1a1220UP"REMldme Feld Repw11W0mCku.PNE Report-01-I5da EXHIBIT A
aN21Wlc Page 7 of 8 2`I0,300s
Claims Paid From 01101108 to 011`15108
Warrant No. Vendor Amount Description
78044 Waxie Sanitary Supply 136.77 Janitorial Supplies
78045 WCR Incorporated 906.52 Mechaniml Pads 5 Supplies
7a046 WEF 364.00 Membership-Water Environment Federation
78047 West Life Supply Company,Inc. 637.36 Electrical Parts 8 Supplies
78048 Weston Solutions,Inc, 14,055.00 Outside Laboratory Analyses
78049 Xyon Business Solutions,Inc. 4,687.50 Temporary Employment Services
78050 California Bank 8 Trust 6.338.00 Consbuction J-33-1A,Retention
78051 Clasen Construction,Inc 3,252.00 Corshudlon P2-82
78052 Orange Community Bank 361.00 Consbudion P2.82,Retention
78053 South Coast Air Quality Management Dist. 740.00 Permit Fees-Annual Emission,Operation 8 Misc.Fees
78054 Laytre T.Baroldi 270.90 Meeting/Training Expense Reimbursement
78055 Peter CheBs 53.00 Meeting/Training Expanse Reimbursement
78055 James E.Colston 400.16 MeetingfTralning Expense Reimbursement
78057 Michele Former 2,019.98 MeetingRralning Expense Reimbursement
78058 Robed P.Ghirelli 183.80 Meeting/Tralning Expense Reimbursement
78059 Doug Rulison 885.55 MeetingfTraining Expense Reimbursement
78060 South Coast Air Quality Management Dist. 201.50 Registration Fee-Rule 1415 Stationary ReMgeretion B Air Conditioning System
78061 County of Orange Auditor Controller 1,005.00 Administration Fees-Adjustments to Property Tax Bills
78062 County Of Orange Audiler Controller 525.00 Administration Fees-Adjustments 10 Property Tax Bills
78053 Orange County Sanitation District 770.81 Petty Cash Rehi
76064 South Coast Air Quality Management Dist. 675.00 Permit Fees-Portable Equipment Program Registration
78065 ASCE Continuing Education 2,277.00 Training Registration
78066 League of California Cities 175.00 Membership
78067 Nelver ant of Southern California 6,697.69 Software-Picture Perfect Server Upgrade
78958 Cads 0.Dillon 12&00 Meekng/Troining Expense Reimbursement
Total Accounts Payable-Warrants 6 13,801,739.27
Payroll Disbursements
32235 - 32338 Employee Paychecks S 154.949.11 Biweekly Payroll 01/0412006
32338 - 32469 Employee Paychecks 142,339.54 Voided Check,Leave Reversal,Leave Payouts,IIS Payments
32562- 32562 Employee Paycheck 3,318.19 Voluntary Termination'
120622 -121187 Direct Deposit Statements 1,073288.10 Direct Deposit Statements 01/04/06
Total Payroll Disbursements $ 1,373,894.94
'hertz 32410-32561 ware ptlmee ror"'.110111.ee Py Wie berwe IMa Inseam wee mv.
WIm Transfer Payments
OCSD Payroll Taxes B Contributions $ 646,939.45 Biweekly Payroll 01104/06
JP Morgan Chase Bank 138,099.17 Series 1993 Refunding COPs December Interest Payment
Total Wire Transfer Payments 5 785,038.62
Total Claims Paid 01101/06-01115106 8 15,9fi0,672.83
11vv,, nm .CEL.e1..PSRnRE¢iNmaPme naodnoeallcieima Pam Report-01.1. EXHIBIT
arrzrmrc Page 8 of 8 211AW
Claim Paid From 0111610E W 0113110E
Warrant No, Vendor Amount Description
Accounts Payable-Warrants
78069 So.Cal Gas Company $ 29,384.60 Natural Gas
78070 South Coast Air Dually Management Dist. 26.493.21 Annual Emiaslon&Toxic Air Containments Fee
78071 South Coast Air Dually Management Diet. 35.345.43 Annual Emiaslon&Toxic Air Containments Fee
78072 Ararat Construction Company,Inc. 155,299.50 Construction Pt$2
78073 Air Products&Chemicals,Inc. 24,500.00 O&M Agreement Oxy.Gen.Sys.MO B-8-89
78074 Alhambra Foundry Co.,Ltd. 4,968.35 Manhole Fremee&Covers
78075 Applied Industrial Technology 64.09 Mechanical Pads&Supplies
78076 ASIS International 150.00 Membership
78077 American Telephone&Telegraph Corp. 31.19 Telephone Service
78078 Baker Tanks 1.131.20 Tank Rentals
78079 County of Orange 595.75 Meint.Agreement-Repair/Installation of Base,Handheld&Vehicle Radios
78080 Court Trustee 90.89 Wage Garnishment
78081 California Relocation Services,Inc. 187.50 Office Files Moving/Relocetion Services
78082 Carollo Engineers 7.156.00 Professional Services Pi-37
78083 Cingular Wireless Airtime 6,155.48 Wireless Services
78084 Commercial Transportation Services 175.00 Training Registration
78085 County of Orange 160.00 Wage Garnishment
78086 Culligan of Orange County 478.12 Metal.Agreement-Can Gen Water Softener System
78087 CWEA 296.00 Operations Plant 2 Division Meeting Registration
78088 DAC(Digital Assurance Certification) 1.500.00 Professional Services-Dissemination Services&Secured Site Bulletin Board Pasting
78089 Davlos Tree Service 1,300.00 Tree Meint.Service
78090 Department of Child Support Services 300.00 Wage Garnishment
78091 DIRECTV 359.00 Subscription
78092 Dun&Bradstreet,Inc. 9,658.00 Reporting Services-Capital Improvement Program Bidder Responsibility Evaluation
78093 Employee Benefits Specialists,Inc. 10.653.23 Reimbursed Prepaid Employee Medical&Dependent Care
78094 Environmental Resource Association 76.69 Lob Pads&Supplies
78095 Court Order 445.00 Wage Garnishment
78095 Feces Corporation 154.33 Freight Services
78097 Franchise Tax Board 50.00 Wage Garnishment
78098 Franchise Tax Board 106.00 Wage Garnishment
78099 Garland Manufacturing Co. 1.138.67 Mechanical Pads&Supplies
78100 IBM Corpomlion 2.375.00 Training Registration
78101 Internal Revenue Service 125.00 Wage Garnishment
78102 IBM Corparelion Way 5,103.66 Maintenance Agreement A5400
78103 Intl.Union of Oper.Erg.AFL CIO Local 501 4,645.62 Dues Deduction
78104 Irvine Ranch Water DlsbMJ 5.45 Water Use
76105 ISEC,Inc. 7.233.00 Professional Services-Remodel at Lob Room 227
78106 Janson Engineering Contractors,Inc. 2,131.0 Repalm&Maintenance Services-Primary Cladfiere P&O
78107 Lbberl Cassidy Whitmore 2,390.00 Annual Membership&Training Workshops-OC Employ.Relations Consortium
78108 Court Order 160,00 Wage Garnishment
78109 Lucd'a Gourmet Foods,Inc. 119.94 Meeting Expense
78110 McMaster Can Supply Co. 203.43 Polyethylene Rackable Pellet
78111 Court Order 225.00 Wage Gamiehment
78112 National Bond&Trust 2,732.01 U.S.Savings Bonds Payroll Deductions
78113 NWRI National Water Research Institute 325.00 Environmental Compliance Services Division Meeting Registration
78114 OCB Reprographics 3,468.78 Printing Service-MO V26100
78115 OCEA 650.54 Dues Deduction
7B118 Orange County Sheriff 85.00 Wage Gamiehment
7a117 Paldot Video Productions 452.23 Video&Editing Services
78118 Peace Officers Council of CA 1.602.00 Dues Deduction,Supervisom&Professionals
XwsPNhfF%CEI-pwa2I1YAP6R�1ne Paid Repam&OM.Wm Paid Repon-01-s1-0 EXHIBITS
fidi Page 1 of 7 21W2006
Claims Paid From 01116/00 to 01131106
Warren No. Vendor Amount Description
79119 BARBS-CWEA 90.00 Operation Plant 1 Division Meeting Registration
78120 SBC 1,611.07 Telephone Services
78121 SBCIMCI 28.82 Telephone Services
7B122 SCESA 185.00 Membership
78123 Soot Specialty Gases,Ina 120.25 Demurrage&Cylinder Rental
78124 Shamrock Supply Co.,Inc. 519.52 Plumbing Pads&Supplies
78125 Court Order 7213D Wage Garnishment
78126 Southern California Edison 1,877.07 Power
78127 U S Bank 4,314 D6 Annual Administrative Fee Re 1992 Refunding Certificates of Participation
78128 United Way 195.00 Employee Contributions
78129 Verimn Celifamis 123.32 Telephone Services
78130 Village Nurseries 220.33 Landscaping Supplies JJ8
78131 Wastewater Technology Tminem 970.00 Training Registration
78132 WEF Registration Dept. 630.00 Pmject Management Office Meeting Registration
78133 Wright Way Developments 435.00 Instrument Repair&Maintenance Services
76134 Xerox Corporation 858.00 Fax&Copier Leases
76135 Coud Order 597.50 Wage Garnishment
78138 1.800-Conferenw(R) 490.16 Conference Telephone Cells
78137 24 Garrote 188.89 Meeting Expenses
78138 Thomas M.Blanda 239.11 MeefingRremirg Expense Renbumement
78139 James A.Carter 130.00 Meetirayhamiig Expense Reimbursement
78140 Fred J.O'Brien 199.82 Meeting/Training Expense Reimbursement
78141 County of Orange Auditor Controller 1140.00 Administrative Fees-Adjustments to Property Tax SINS
78142 South Coesl Air Quality Management Disl. 540.00 Portable Equipment Registalion Program Fes
78143 City of Fountain Valley 2.316.78 Building Permit Fee J58
78144 City of Fountain Valley 2,097.73 Building Permit Fee J58
78145 Plans Clark-Alkins Water 40,320.00 Anaerobic Baffled Reactor(ABR)Testing
78146 Amedcen Express 25,991.55 Purchasing Card Program,Misc.Supplies&Services
76147 Black&Vealch Corporation 580,868.42 Engineering Services P1-76,J-77&PI-102
78148 Blue Cross of California 365.943.08 Medical Insurance Premium
78149 California Soil Producte 32,900.79 Residuals Removal MO 3.29.95
7B150 Camp Dresser&Mckee,Inc. 104,919.65 Engineering Service J-71-6
78151 City of Fountain Valley 35.687.71 Water Use
78152 Della Dental 58,709.79 Dental Insurance Plan
78153 Environmental Engineering&Contracting 26,000.00 Prof.Services-PreperatloMralning-Indus.Wastewater Trail.Operator Tri Course Vll
78154 Earth Tech,Inc. 44,617.30 Professional Services P2-79
78155 Geomatdx Consultants,Inc. 27.160.00 Soils,Concrete&Other Materials Testing
78156 Innedine Engineering 37.470.66 Video Inspections of Sewerime Segments for Damage,Infilitration&Illegal Connections
78157 IPMC c/o Parsons 1.159.562.00 Eng.Sew.-Integrated ProgramlP.lect Mgml.,Temp.Slatting,Materials&Supplies
78158 Kaiser Foundation Health Plan 68.455.89 Medical Insurance Premium
78159 Kemiron Companies,Inc. 207.993.31 Fanlc Chloride
78160 Lee&Ro,low. 40,370.09 Professional Services 551,552&549
78161 Malcolm Pont,Inc. 414,943.91 Professional Services J49,P2.80&11-28
78162 MWH Americas,Ina. 43.434.81 Professional Services J-101
78163 Pioneer Americas,Inc. 249,844.70 Sodium Hyp tchlonte
78164 RMS Engineering&Design,Inc. 24.072.55 Engineering Services J-96
78165 Sancon Engineering,Ino. 47.725.00 Manhole Rehabilitation Program
78166 Tule RanchlMegan Farms 255,450.34 Residuals Removal MO 3.29-95
78167 US Met.Group,Inc. 29,222.50 Janitorial&Floor Maintenance at Plants 1&2
78168 US Peroxide,L.L.C. 105,439.45 Odor&Corrosion Cud.Treatment for Coll.Sys.;Hydrogen Peroxide&Ferrous Chloride
78189 Ararat Construction Company 60,295.40 Construction PI.62
HwrommExCELAai 00,PSHn Claims vas aavonrosoncreims Paid Rapan-0"1415 EXHIBIT
naa.aa Page 2 of 7 v1025us
Claims Paid From 0111SMS to O1p1106 s
Warrant No. Vendor Amount Description
78170 ARB,Inc. 213.706.00 Construction 7.36
78171 Delke&Sons Constructions,Inc. 251.357.21 Construction P2.66-2&J-88
78172 Ken Thompson,Inc 202,047.30 Construction 24148
73173 Kmwt Pacific Co. 824,787.00 Constmction 5.81
78174 Margate Construction,Inc. 118.774.69 Construction J47
78175 Sanoon Engineering,Inc 87.379.20 Construction 7.21
78176 Wells Fargo Bank Mae C7300-012 91,643.00 Construction 5-51&5.52,Retention
781n LA Chemical 3,699.20 Bleach
78178 AN Chesterton 6,018.65 Mechanical Seals
78179 ASS Automatics,Inc. 81&00 Repair&Maintenance Service-Flow Meter
78180 Abrasive Engineering Tools&Equipmenl 147.21 Mechanical Parts&Supplies
78181 Absolute Standards,Inc. 54.00 Lab Parts&Supplies
75182 ACCU Skulls 450.51 Lab Parts&Supplies
78183 ACE Ergonomics 1.550.00 Professional Services-Ergonomic Workstation Evaluations
78184 Agilent Technologies.Inc, 622.84 Lab Pans&Supplies
78185 Air Products&Chemicals,Inc. 24,500110 O&M Agreemenl Oxy.Gen.Sys.MO BA-89
78186 Aigas Safely,Inc. 2.955.33 Salary Supplies
78187 American Chemical Society 142.00 Membership
78180 Amedcan Concrete Institute 126.50 Publication
78189 AMTECH Elevator Services 1,400.W Elevator Repairs&Maintenance Agreement
78190 American Telephone&Telegraph Corp. 25.67 Telephone Service
78191 Awards&Trophies Company 75.97 Amrds&Trophies
78192 Baker Tanks 1,652.00 Tank Rentals
78193 Basic Chemical Solutions 22,174.97 Bochum Bisulfile&Sodium Hydroxide
76194 Baywood,Inc. 148.71 Misc.Boat Paris&Supplies-Nerissa
78195 Bell Pipe&Supply Co. 17.62 Piping Supplies
78196 Buckram&Associates,Inc. 1.120.00 Professional Sences-Payment Management
78197 California Municipal Statistics,Inc. 500.00 Debt Statement-2006 Certificates of Participation Dated 12131IDS
781% Martin Boyer Co,Im cJo Cambridge 6,825.00 Prof.Services-Workers Compensation Claims
781% Cardlock Fuel Systems,Inc. 14.145.82 Fuel Card Program-District Vehicles&Monitoring Vessel
78200 Can Warren&Go. 448.71 Insurance Claims Administrator
78201 CASA 2,750.00 General Management Division Meeting Registration
78202 Casual Emanuel 72.41 Meeting Expenses
78203 Cbrgular Wheless Airtime 8.198.71 Wireless Strikes
782N City of Tustin 873M Water Use
78205 CMAA 85.00 Training Registration(Construction Management Association of America)
M206 Coast Fire Equipment 1,29023 Annual Fire Extinguisher Inspection&Servidrg at Pits.1&2 and Pump Stations
78207 Computer Sciences Corp. 822.84 Consul ing&Lab Services-Assay Plot Project
78208 Consdidaleu Reprographics 51.38 Printing Services
78209 Consumers Pipe&Supply Co. 1,916.78 Plumbing Pans&Supplies
78210 Controlled Motion Solutions 161,72 Mechanical Pans&Supplies
78211 Cooper Cantered Corporation 2,297.11 Engine Supplies
75212 Corporate Express 1204.09 Office Supplies
79213 Co men Engineering 2,050.86 Pump Paris&Supplies-Impeller
78214 Comely of Orange Auditor Controller 2.309.00 Encroachment Permit 741
78216 County of Orange Auditor Controller 2,672.W Encroachment Permit 741
78216 CR&R,Inc. 2.520.00 Container Rentals
78217 Culligan of Orange Canty 42.80 Maim.Agreement-Can Gen Water Softener System
78218 Cummins Cal Pacific,L.L.C. 559.85 Tank Heaters
78219 Custom Control Sensors 249.99 Electrical Pans&Supplies
78220 CWEA Membership 200.00 Membership(Call.Water Environmenl Assoc)
H PM RgvM60Miaimf PNE Ronan-Oldt-0a EXHIBIT B
0,210k, Page 3 of 7 WMANKIS
I
Claims Paid From 01116106 W 01131/06
Warrant No. Vendor Amount Description
78221 Dangelo Company,Inc. 1.719.69 Valves
78222 Davids Tree Service 7,225.00 Tree Maim.Service
78223 DDB Engineering,Inc. 875.00 Professional Services-Grant Management
78224 Dennis Greenberger,Ph.D. 187.50 Professional Services-Fit for Duty Exam
78225 Dezurk Wale,Controls 116.56 Mechanical Pads&Supplies
78226 DIAL Express USA,Inc. 52.47 Freight Services
78227 Dionex Corporation 350.58 Lab Parts&Supplies
78228 E Sam Jones Distributors,Inc. 177.79 Electrical Parts&Supplies
78229 Employers Group 200.00 On-Site Training-Leaves of Absence
78230 Employee Benefits Specialists,Inc. 616.70 Reimbursed Prepaid Employee Medical&Dependent Care
78231 Employers Group 1,200.00 On-Sire Training-Customer Service/Telephone Skills
78232 ENS Resources,Inc. 10.000.00 Professional Services-Legislative Advocate
78233 Environmental Compliance Inspection Svcs. 2,120.00 Professional Services-Fats,Oil Grease(FOG Program)Inspections
78234 Envronmental Resource Association 1.416.58 Lab Parts&Supplies
78235 ESRI,Inc. 777.00 On-Site Training-ArcGIS Software
78236 Ewing Irrigation Industrial 177.57 Landscape Irrigation Paris&Supplies
78237 Fedex Corporation 1.861.87 Freight Services
78235 Ferguson Enterprises,Inc. 1,086.12 Valves
78239 Fisher Scientific Company,L.L.C. 4,707.25 Lab Pans&Supplies
78240 Forked Engineering&Surveying,Inc. 4.730.25 Engineering Services 551,5-52&Pi-102
78241 Fountain Valley Rancho Hard Wash 760.00 Vehicle Washing&Waxing Services
78242 Franklin Covey 54.39 Office Supplies
78243 Wendy Greene 1,163.85 User Fee Refund Regarding Septic Tanks
7a243 Gerhardti,Inc. 2,132.94 Mechanical Pads&Supplies
78245 Gelinge Castle 1,096.00 Lab Instrument Mainlenance Agreement
76246 Goldenweat Window Sera 2,470.00 Landscape/Hadscape Mainlenance Services
78247 Grainger,Inc, 4.345.11 Electricel Pads&Supplies
78248 Guarantee Records Management 302.93 Off-Site Records Storage
78249 Hasker Equipment Company 277.47 Misc.Vehicle,Parts,Repairs&Servloe
78250 Hach clo Person Industries 966.74 Lab Pans&Supplies
78251 Hanks Electrical Supplies 27.73 Electrical Pads&Supplies
7842 Harold Primrose Ice 80.00 Ice For Samples
78253 Harrington Industrial Plastics,Inc. 1,831.99 Plumbing Supplies
78254 Hill Brothers 19.975.30 Chemicals-Odor&Corrosion Control-Newport Trunkline
78256 Hilt,Inc. 3,299.62 Mechanical Pens&Supplies
78256 Home Depot 644.12 Misc Repair&Mainlenance Material
78257 Icon International,Inc. 2.623.31 Lab Pans&Supplies
78258 IDEXX 4.019.08 Lab Paris&Supplies
76259 IECOC 30.00 Training Registration
78260 Industrial Distribution Group 5.018.99 Tools,Locks,Paint&Mechanical Supplies
78261 Industrial Metal Supply T7.36 Metal
78262 Industrial Power Technologies 113.07 Mechanical Pans&Supplies
78253 Inorganic Ventures,Inc. 192.80 Lab Pads&Supplies
78264 Intemational Electrical Testing Assoc. 2,724.20 Training Regisl2lion
78265 Iron Mountain 100.00 Bid Document Storage Fees P1-37
78266 Ironman Parts&Services 19524 Mechanical Pans&Supplies
78267 Jams Collision 2,059.76 Vehicle Repairs&Painting Services-V451
78268 JJ Keller&Associates 745.00 Publication
78269 Johnstone Supply 305.95 Valve
78270 J2 Printing Services 849.07 Printing-Forms
78271 Kua TeMlea,Inn 6.925.22 Reconcilialion User Fee Refund Program
HWeplUn1E%CELEISV2MPSHARE ime PNERepp.W60TCIBMe P8i0Reon 01-31-06 EXHIBIT
M42101p Page of a,laxx •I
Claims Paid Fram 01/16105 to 01131/06
Warrant No. Vendor Amount Description
78272 Klelnfolder,Inc. 123.00 Soils,Concrete 6 Other Materiels Testing
78273 LA CAD Corporation 275.00 Training Regiskelion
78274 Lawyers Title Company 350.00 Title Searches-OCSD Tmnk Sievers
78275 League of California Cities 1,687.50 General Management Division Meeting Registration
78278 Uetad Cassidy 6,355.00 Professional Service-Human Resources
78277 LINJER 10.797.03 Professional Service-DART MO 9.22-99
78278 Loaned Education Services 636.00 Training Registration
78279 Doyle Moberly 1.163.85 User Fee Refund Regarding Septic Tanks
78280 Managed Health Network 1,057.76 Employees Assistance Program
7WIll Malunkin Corporation 258.01 Valve
78282 McMaster Can Supply Co. 2,081.25 Electrical,Mechanical 6 Lab Parts 8 Supplies
78283 Medlin Controls Co. 4,388.70 Instrument Supplies
78284 Mesa Consolidated Water Dist. 15.19 Water Use
78285 Moreland 8 Associates 2,070.00 Auditing Services-Special Project J415-2
78286 Motor Cargo 144.43 Freight Charges
78287 Municipal Information Systems 240.00 Membership
78286 National Filter Media Corporation 13,942.50 Filler Press Bells
78289 National Plant Services.Inc. 13.735.40 Vacuum Truck Services
78290 Neal Supply Co. 850.56 Plumbing Supplies
78291 Ninyo 8 Moore Corporate Accounting 16,046.00 Prof.Services-Materiels Tesfingllnap.&Geolecreeml Engrg.-P1-37 6 P246-2
78282 The Norco Companies 335.72 Mail Delivery Service
78283 N l National Water Research Inslilum 425.00 Environmental Compliance Services Div.Meeting Registration
78294 OC Tanner Recognition Company 95.07 Employee Service Awards Program
78295 01 Reprographics; 166.47 Printing Service-MO 1/26I00
78296 Office Depot Business Services Div. 1,096.68 Office Supplies
78297 OMI Industries 3,860.00 Instrument Paris B Supplies
78298 OneScurce Dlstdbulora,Inc. 1,365.79 Electrical Parts 6 Supplies
78299 OPTIC,Software,Inc. 6,389.87 Software Maintenance Agreement
78300 Orade University 697.66 Training Registration
78301 Cam"Fluid System Technologies,Inc. 423.93 Plumbing Pads 6 Supplies
78302 Cam,Construction Supply 196.50 Marking Pamil
78303 Oxygen Service Company 134.90 Specialty Gases
78304 Pacific High Reach,Inc. 12,261.91 Aerial Lift Rental
78305 Pacific Mechanical Supply 1277.67 Plumbing Pads 8 Supplies
78306 Pacific Publishers 10.96 Publication
78307 Paragon Plastics Company 248.90 Plexiglass
78308 Parker Supply Company 4.981 Repairs B Maintenance Service-Shop Floor Primer/CaeNng
7B3o9 PCG Industries 1,950.00 Repairs B Maintenance Service-Pump Shaft
78310 PerklnE6ner LAS 126.63 Lab Pads B Supplies
78311 PetSolulions 84.49 Lab Pads B Supplies
75312 PFE International.Inc. 1.205.20 Equipment Service Agreement
78313 PFTIAlexander Service,Inc. 181.63 Freight Charges
78314 PL Henan Company,Inc. 1,027.27 Air plane
78315 Polydyne,Inc. 24,060.07 Cationic Polymer MO 3-11-92
78316 Pardon Industries,Inc. 568.88 Instrument Pens&Supplies
78317 Pod Supply 48.13 Electrical Pans far Fluorescent Ught-Nei Ocean Monitoring Vessel
78318 Primary Source Office Funnuf ings.Inc. 941.74 Oni Fumlfora
78310 Prudential Overall Supply 2,622.14 Uniforms B Related Articles
78320 PS TEK,L.L.C. 222.35 Mechanical Pads 8 Supplies
78321 Ralnln Instrument,L.L.C. 502.37 Lab Pend 8 Supplies
78322 Voided Check - -
H Wep1%rZXCELd1aQ27V PSIMRE09Ia s Paid ReporMM1OTCWm Paid Repoa-01-31a9 EXHIBIT B
nnaiuc Page 5 of 7 w1woo9
Claims Paid From 01116106 to 01131/06
Warrant No. Vendor Amount Description
78323 Red Wing Show 147.40 Safety Shoes
78324 RF MacDonald Co. 61221 Electrical Paris 8 Supplies
78325 Rockhurst College Commuting Education 780.00 Project Management Office 8 Eng.B Comp.Mgmi.Divisions Meeting Registration
78326 Retoik Controls,Inc. 16.667.66 Materials,Supplies 8lnstallation P142
78327 Royale Cleaners 12.00 Dry Cleaning Services
78328 RSA Suite,Soil Products 1,575.84 Soil Materials
78329 Rebekah Schneider 1,163.85 User Fee Rehmtl Regarding Sepik Tanks
78330 Catherine Senoram 522.50 Reconciliation User Fee Refund Program
78331 SARBS-CWEA 56.00 Training Registration
78332 SAWPA 15.000.00 Santa Ana River Fish Conservation Annual Funding
78333 SBC 737.20 Telephone Services
78334 SBC Long Distance 1,178.42 Long Distance Telephone Services
78335 SBCNCI 2.857.89 Telephom Services
78336 Schwing America,Inc. 2,562.76 Pump Pads 8 Supplies
78337 City of Seal Beach Finance Dept. 111.88 Water Use
78335 Seavisual Consulting,Inc. 4,302.00 Professional Services-Ocean Outiall Current Meter Services
78339 Sever Equipment Company of Americe 196.11 Hose Guides
78340 Shamrock Supply Co..Inc. 2,857.64 Concrete Mix 8 Mechanical Paris
78341 Shureluck Sales 8 Engineering 3,3B2.16 Mechanical Pads 8 Supplies
78342 Smith Emery Company 456.00 Soils,Concrete 8 Other Materials Testing
78343 Smith Pipe 8 Supply,Inc. 617.09 Landscape Irrigation Supplies
78344 Soulhwest Concrete 419.34 Concrete
78345 Spec Servces,Inc. 16,347.11 Engineering Services J-33-1
78346 Spex Ceniprep,Inc. 329.83 Lab Pads 8 Supplies
78347 Stanley Steamer lntemalional,Inc. 636.50 Carpel Cleaning Services
78348 Stratus Environmental,Inc. 4,455.0D Professional Services-Groundwater Monitoring
78349 Summit Steel 5.630.18 Metal
78350 Burned!Industrial Pam 624.47 Mechanical Pans 8 Supplies
78351 T 8 D Communications 1.255.85 Construction P2E6-2
78352 Teledyne Analytical 96.02 Instrument Pads 8 Supplies
78353 Terminix International 1.035.00 Past Control
78354 The JG Press,Inc. 75.00 Books 8 Publications
78365 The Pittsburgh Conference 520.DD Training Registration
78356 The Standard Insurance Company 4,731.25 Executive Disability Insurance
78357 The Walking Men,Inc 1,075.00 Public Notice Printing 8 Mailing Services 7.36 8 741
78358 Thomas V.Gedinger 2,000.00 Lab Analyses
78359 Thompson Industrial Supply,Inc. 1.224.30 Mechanical Parts 8 Supplies
78360 TMV Systems Engineering,Inc 4,062.50 Software Maintenance
76361 Tanya Lack 8 Safe Service 8 Sales 4,418.78 Computer HardmWSo11wam
78362 Townsend Public Affairs 5,OOOAO Legislative 8 Executive Advocate for Grant Funding
78363 TREMCO Incorporated 780.00 Professional Services-Roof Evaluations at PH.2
78364 Truck 8 Auto Supply,Inc. 91.82 Automotive Supplies
78366 Tuff Skin 435.00 Truck Repairs-Line-X Utility Bad of V451
78366 US Filter Corp. 766.75 Service Agreement-DI Water Systems at Plants 1&2
78367 Ultra Scientific 154.38 Lab Pads 8 Supplies
78368 Underground Electric Supply 2,796.67 Electrical Pads S Supplies
78368 United Parcel Service 80.32 Parcel Services
78370 United Pumping Service 3.888.38 Pumping Service
78371 Universal Silencer 1,360.55 Air Filters
78372 US Equipment Co.,Inc. 1,499.13 Oil Coolant
78373 Vapex,Ins. 3,195.00 Instrument Pads 8 Supplies
H Wepmn�Ex[EL41N]WW6HARE1cWma P.M RvpmllCgeTCNlmv PW Repml-m-alLe EXHIBIT B
s�vztax Page 6 of 7 V10cM'
Claims Paid From 01116106 to 01/31106 f
Warrant No. Vendor Amount Description
78374 Varian Asso sales,Inc. 2.537.95 Lab Pads&Supplies
78375 Vision Service Plan CA 9.957.96 Vision Service Premium
78376 Vortex Corp. 6.451.60 Door Repairs-Various Locations
78377 V WR Scientific Products Corporation 4,447.63 Lab Path&Supplies
78375 The Wackenhut Corporation 10.119.56 Security Guards
78379 Weak,Sanitary Supply 1,329.74 Janitorial Supplies
78380 WEF 470.00 Membership-Water Environment Federation
78351 Wil 900.00 Training Registration
78362 West Ule Supply Company,Inc. 552.04 Electrical Pads&Supplies
78383 William M.Nugent&Co.,Inc. 59.75 Mechanical Parts&Supplies
78384 Xerox Corporation 17.079.84 Fax/Copler Leases,Managed Services&Supplies
78385 YalelChase Materiels Handling,Inc. 2,118.76 Aulomolive Paris&Supplies
78385 Yokogawa Corp.ofAmenca 320.51 Instrument Supplies
78387 Mani Meadows Corp. 14,519.00 Construction FE03-24
78388 Union Bank of California 23,745.00 Construction 7-36&7.41
78389 Slew Anderson 97.97 MeelingR2ining Expense Reimbursement
78390 Richard Green 26.84 Meetingffraining Expense Reimbursement
78391 Chuck Hodge 36.00 Meettrgffraining Expense Reimbursement
78392 Handal S.Khublell 125.00 Meetingffraining Expense Reimbursement
78393 Subash Mysore 182.03 Meetingrrraining Expense Reimbursement
78394 Ellen Ray a70.20 Meetingffraining Expense Reimbursement
78395 Rka Riccardo 130.00 Meetl gRralning Expense Reimbursement
78388 Warren L.Stemin 90.00 Meelirg/freining Expense Reimbursement
78397 South Coast Air Duality Mgmt.Dist, 12,824.39 Permit Processing Fee P2-90
78388 Ehan Lucena and COSTCO 3,000,00 Employee Computer Loan Program
78389 South Coast Air Quality Mgmt.Diet. 9.459.62 SCAOMD Permit Modification PI-102
]SHOD Enchanter,Inc. 7,500.00 Ocean Monitoring&Oulfall Inspection&Maintenance
78401 RMS Engineering&Design,Inc. 5,630.00 Engineering Services-Structural DravMgs
78402 County of Orange Auditor Controller 135.00 Adminlstralive Fees-Adjustments to Property Tax Bills
Total Accounts Payable-Wansnts $ 6.879.105.71
Payroll Disbursements
32470 - 32561 Employee Paychecks $ 162.452.15 Biweekly Payroll 01/18106
32563 - 32673 Employee Paychecks 21,99&25 Relireme es,Reim.Termination,PR Adjustm rids&VoidslRetvuev
121l8B - 121741 Dired Deposil Slatements 1.137.081.48 Dired Depos6 Statements 01/18MB
Total Payroll Disbursements $ 1,321,541.86
-Clw L Xo.YY]w.mW oW aroNnon v11Ce.
Who Transfer Privies
OCSD Payroll Taxes&Contributions $ 807,403.38 Biweekly Payroll 01118/06
US Bank $ 2.381.426.12 Series IBM-92 Advance Refunding COPS Principal&Interest Payment WWII
US Bank 115,987.97 Series 20D0 A&B Refunding COPS January Interest Payment
Union Bank of California 6,676,046.67 Series 2003A,COPa January Interest Payment
Total Wire Transfer Payments $ 9,981,763.04
Total Claims Paid 01116106.01131106 $ 18,182,410.63
H Wep6M1E%CELEne1230NPSHARDCIaima Pvd R,evn (Mlelma Pat Rwn-01-31-06 EXHIBIT
n.nlmk Page 7 of 7 M0,,201191
e
v
Y
Orange County Sanitation District
MINUTES
BOARD MEETING
February 22, 2006
S AN I TgT�oy
Q 9
� ee
o �
�cr�N HE ENV`���
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
Minutes for Board Meeting av
Page 2 r
02/22/06
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was held on
February 22, 2006 at 7:00 p.m., in the District's Administrative Offices. Following the Pledge of
Allegiance and invocation the roll was called and the Secretary reported a quorum present as
follows.
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Steve Anderson, Chair Steve Simonian
X James M. Ferryman, Vice Chair Arlene Schafer
X Charles Antos Paul Yost
X Don Bankhead Leland Wilson
X Carolyn Cavecche Steve Ambriz
X Alberta Christy Mike Garcia
X Larry Crandall John Collins
X Bill Dalton Mark Rosen
X Doug Davert Tony Kawashima
X Michael Duvall Jim Winder
X Norman Eckenrode Constance Underhill
X Richard Freschi Bob Fauteux
X Sukhee Kang Steven Choi
X Phil Luebben Lydia Sondhi
A Patsy Marshall Jim Dow
X Darryl Miller Douglas Reinhart
X Roy Moore John Beauman
X Joy Neugebauer VrAan Kirkpatrick-Pilger
X Ken Parker Catherine Driscoll
X Tod Ridgeway Don Webb
X David Shawver Brian Donahue
X Harty Sidhu Bob Hernandez
X Jim Silva Lou Correa
X Dave Sullivan Debbie Cook
X Mack Waldman Ralph Rodriguez
STAFF MEMBERS PRESENT: Jim Ruth, Interim General Manager; Penny Kyle, Board
Secretary; Nick Arhontes; Bob Ghirelli; Jim Herberg; Dave Ludwin; Patrick Miles; Lisa Tomko;
Lorenzo Tyner; Life Kovac; Jeff Reed; Layne Baroldi; Jeff Reed; Daisy Covarrubias; Mike
Moore; Mike Larkin; Paula Zeller; Simon Watson
OTHERS PRESENT: Brad Hogin, General Counsel; Larry Porter; Jan Vandersloot; Rusty
Rustan; Irwin Haydock; Eileen Murphy; Mark Miller
1
Minutes for Board Meeting
Page 3
02/22/06
MOVED, SECONDED AND DULY CARRIED: Receive and file minute excerpts from the
following re appointment of active and altemate Directors, as follows:
City/Acencv Active Director Alternate Director
Fountain Valley Larry Crandall John Collins
Newport Beach Tod Ridgeway Don Webb
Tustin Doug Davert Tony Kawashima
Villa Park Richard A. Freschi Bob Fauteux
Board of Supervisors Jim Silva Lou Correa
PUBLIC COMMENTS
The public requested their comments be made after the update on treatment costs and level of
treatment under the General Manager's report.
REPORT OF THE CHAIR
In the absence of Chair Steve Anderson, Vice Chair Ferryman reported on the Biosolids
Compost Workshop in Fountain Valley held on February 9r'. He also reported that Chair
Anderson requested the Directors' attendance to one of two CIP Orientation Workshops
scheduled for March Wh and March 29P.
REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, referred to the monthly status report included in the
Directors' meeting folders that identifies the major issues challenging the District.
Jim Herberg, Director of Operations and Maintenance, provided a presentation on the costs
associated with the levels of treatment to wastewater discharged to the ocean.
The following persons expressed support for the District to continue the current level of
treatment to the wastewater: Rusty Rustan; Jan Vandersloot; Larry Porter; Eileen Murphy; and
Irwin Haycock.
REPORT OF THE GENERAL COUNSEL
General Counsel Brad Hogin had no report.
APPROVAL OF MINUTES
The Chair ordered that the minutes of the regular meeting held January 25, 2006, be deemed
approved as corrected.
Minutes for Board Meeting
Page 4 s
v
02/22106
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and "B", attached hereto and made a part of these minutes.
ALL DISTRICTS 01/15/06 01/31/06
Totals $15,960,672.83 $18,182,410.63
Director Cavecche abstained from discussion and voting on Warrant Nos. 77830 and 78010.
Director Davert abstained from discussion and voting on Warrant Nos. 77827 and 77991.
Abstentions were pursuant to California Government Code Section 84308.
CONSENT CALENDAR
9. No hems considered.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE: A verbal report was presented by Vice Chair Ferryman re the
February 22, 2006 meeting.
Vice Chair Ferryman reported the Steering Committee was briefed on the meeting
between the General Manager and SAWPA. Nick Arhontes, Director of Regional Assets
and Services, reported on the SARI line breach and the repairs scheduled to be
completed the week of March 3, 2006.
Steering Committee Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Steering Committee
Minutes for the meeting held on January 25, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 1 to the
contract with James D. Ruth, Interim General Manager, extending the contract to
December 31, 2006; three weeks paid leave; and a $100,000 fife insurance
policy.
Director Crandall opposed.
Steering Committee Non-Consent Calendar
No items were considered.
r Minutes for Board Meeting
Page 5
0222/06
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE
OMTS Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Operations,
Maintenance and Technical Services Committee Minutes for the meeting held on
February 1, 2006. to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Award a contract to V&A
Consulting Engineering, Inc. for Sewer Line Video Inspection Review Services,
Specification No. 5-2005-241, providing services for assessing the physical
condition of sewers from existing CCTV videotapes, for an amount not to exceed
$469,800.
C. Item pulled for discussion.
d. MOVED, SECONDED AND DULY CARRIED: (1)Authorize the General
Manager to participate in the Santa Ana Watershed Stonmwater Quality Task
Force project for reevaluation of water quality standards as they relate to storm
water and dry weather flows; and,
(2)Authorize an additional amount of$20,000 for a total amount not to exceed
$30,000 to the Santa Ana Watershed Project Authority (SAWPA), for
participation in Phases II and III of the project.
Director Cavecche opposed.
e. Item pulled for discussion.
Non-Consent Calendar
C. Approve Change Order No. 5 to Purchase Order No. 101758-OB for Purchase of
Cationic Polymer, Specification No. C-2003-143, issued to Polydyne Inc., for a
unit rate increase of$0.70 per active pound for Solution Polymer increasing the
total price to $1.75 per active pound plus tax, and a unit rate increase in Mannich
Polymer of$0.249, increasing the total price to$1.529 per active pound plus tax,
for an estimated amount of$1.280,000 for the period July 1, 2006 through
June 30, 2007.
Staff was directed to review with legal counsel the purchase order terms and
conditions to define the legitimacy of this price increase and to resubmit to the
Board of Directors in March.
MOVED, SECONDED AND DULY CARRIED: That this item be continued to the
March 22, 2006 Board of Directors meeting for consideration.
e. In response to Directors' questions, Nick Arhontes, Director of Regional Assets
and Services, briefed the Board members on the limited services that would be
included in the agreement with the city of Placentia. The rates charged back to
the city will be fully-burdened and services would be provided on a pre-planned,
Minutes for Board Meeting , 1
Page 6
02/22/06
scheduled basis without affecting the effectiveness of the Sanitation District's
collection systems.
MOVED, SECONDED AND DULY CARRIED: Approve a Reimbursement
Agreement with the City of Placentia for a two-year pilot project to assist the city
in improving their sewer system management program and operations and
maintenance, to achieve improved compliance with the Regional Water Quality
Control Board's Waste Discharge Requirements Order(WDR), in a form
acceptable to the General Counsel.
Director Bankhead opposed.
13. PLANNING DESIGN AND CONSTRUCTION COMMITTEE
PDC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Planning, Design and
Construction Committee Minutes for the special meeting held on January 26,
2006, and the regular meeting held on February 2, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 6 to
Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk Improvements,
Contract No. 7-41; and City of Tustin Project Nos. 6106 and 6151 with ARB, Inc.,
authorizing an addition of$55,000 and five calendar days time extension,
increasing the total contract amount to$20,224,324.
C. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No. 11 to
Effluent Pump Station Annex, Job No. J-77, with J.F. Shea Construction, Inc.,
authorizing an addition of$100,302, increasing the total contract amount to
$44,393,556; and,
(2) Ratify Change Order No. 12 for an Adjustment of Engineered Quantities,
authorizing an increase of$138,502, increasing the total contract amount to
$44,532,058.
Director Davert abstained.
d. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 18 to
Bushard Trunk Sewer Rehabilitation, Job No. 1-24, with Steve P. Rados, Inc.,
authorizing a credit of$823,407 for deletion of work scope from the contract,
decreasing the total contract amount to$34,886,706.
e. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 25 to
Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37, with Margate
Construction, authorizing an addition of$116,822, increasing the total contract
amount to$72,088,850.
Minutes for Board Meeting
Page 7
02/22/O6
f. MOVED, SECONDED AND DULY CARRIED: Approve a Professional Services
Agreement with Camp, Dresser& McKee, Inc. for engineering services for 66kV
Substation at Plant No. 1, Job No. 131-97, for an amount not to exceed $779,381.
g. MOVED, SECONDED AND DULY CARRIED: (1)Approve budget increase of
$96,000, increasing the total project budget to$3,172,000; and,
(2)Approve Amendment No. 1 to the Professional Services Agreement with M. J.
Schiff&Associates, Inc. providing for final design and construction support
services for Interplant Gas Line Rehabilitation, Job No. J-106, for an additional
amount of$119,147, increasing the total amount not to exceed $257,526.
h. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 2 to the
Professional Services Agreement with MWH Americas, Inc. to provide
construction support services for Rehabilitation of the Activated Sludge Plant at
Plant No. 2, Job No. P2-74, for an additional amount of$564,338, increasing the
total contract amount not to exceed $2,753,699.
i. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 5 to the
Professional Services Agreement with Lee& Ro, Inc., providing for additional
design engineering services for Replacement of the Bitter Point Pump Station,
Contract No. 5-49; Replacement of the Rocky Point Pump Station, Contract No.
550; Rehabilitation of the 10 Street Pump Station, Contract No. 5-51; and
Rehabilitation of the"A" Street Pump Station, Contract No. 5-52, for an additional
amount of$1,017,316, increasing the total amount not to exceed $4,480,816.
j. MOVED, SECONDED AND DULY CARRIED: Authorize the General Manager to
enter into a sole source agreement with Southern California Edison for the
procurement of a temporary power service connection at the intersection of Ellis
Avenue and Bushard Street in connection with Bushard Trunk Sewer
Rehabilitation, Job No. 1-2-4,for the duration of construction at the intersection,
for an estimated amount of$350,000.
k. MOVED, SECONDED AND DULY CARRIED: Approve time extensions to
Cooperative Project Contract Agreements: Contract No. 0403 with Costa Mesa
Sanitary District; Contract No. 0409 with Garden Grove Sanitary District; Contract
No. 0404 with the City of Fountain Valley; and Contract No. 0130 with the City of
Orange.
I. MOVED, SECONDED AND DULY CARRIED: Approve a budget amendment of
$1,511,800 for a total project budget of$3,810,376 for Realignment and
Rehabilitation of the Big Canyon Offske Trunk Sewer, Contract No. 5-62.
Non-Consent Calendar
No items were considered.
Minutes for Board Meeting
Page 8
02/22/06
14, FINANCE ADMINSTRATION AND HUMAN RESOURCES COMMITTEE
FAHR Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Finance,
Administration and Human Resources Committee Minutes for the meeting held
on February 8, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Receive and file report of General
Manager approved purchases in amounts exceeding $50,000 in accordance with
Board purchasing policies.
C. MOVED, SECONDED AND DULY CARRIED: Receive and file the FY 2005-06
Quarterly and Mid-Year Consolidated Financial Reports for the period ended
December 31, 2005.
Director Christy abstained.
d. MOVED, SECONDED AND DULY CARRIED: Approve the FY 2006-07 and FY
2007-08 Budget Assumptions and direct staff to prepare the FY 2006-07—2007-
08 Budgets incorporating these parameters.
e. MOVED, SECONDED AND DULY CARRIED: (1)Approve a Purchase Order
Contract with Lance, Soil & Lunghard, Certified Public Accountants, as the
District's contracted internal auditors for FY 2005-06, for the period of March 1,
2006 through February 28, 2007, for an amount not to exceed $58,670, with an
option to renew the contract for two one-year periods based on approval by the
FAHR Committee; and,
(2) Direct Lance, Soil& Lunghard to perform specific internal auditing
assignments as the FAHR Committee deems necessary.
f. MOVED, SECONDED AND DULY CARRIED: Approve revised pricing with
Cambridge Integrated Services Group, Inc. for third-party administration of
Workers' Compensation as provided in Flat Fee Option B.
g. MOVED, SECONDED AND DULY CARRIED: (1)Adopt Resolution No.
OCSDO6-02, a Resolution of the Board of Directors of the Orange County
Sanitation District Authorizing the Execution and Delivery by the District of an
Installment Purchase Agreement, a Trust Agreement, a Standby Certificate
Purchase Agreement, a Purchase Contract and a Remarketing Agreement in
connection with the execution and delivery of Orange County Sanitation District
Certificates of Participation, Series 2006,Authorizing the Execution and Delivery
of such Certificates Evidencing Principal in an Aggregate Amount of Not to
Exceed $200,000,000, Authorizing the Distribution of an Official Statement in
Connection Therewith and Authorizing the Execution of Necessary Documents
and Certificates and Related Actions.
Director Christy abstained.
Minutes for Board Meeting
_ Page 9
02/22/06
FAHR Non-Consent Calendar
No items were considered.
15. CIP OVERSIGHT COMMITTEE
CIP Oversight Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order the draft CIP Oversight
Committee Minutes for the meeting held on February 9, 2006, to be filed.
Committee Chair Luebben provided a brief review of the complexities reviewed
by the Committee on the Capital Improvement Program, and encouraged all
Directors to attend one of the two workshops to be held on March 15 and
March 29, in order to consider several scenarios and make informed decisions as
they relate to the user rate increases.
CIP Oversight Non-Consent Calendar
No items were considered.
16. LEGISLATIVE AFFAIRS COMMITTEE
Legislative Affairs Committee Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Legislative Affairs
Committee Minutes for the meeting held on February 14, 2006, to be fled.
Legislative Affairs Committee Non-Consent Calendar
No items were considered.
17. GWR SYSTEM STEERING COMMITTEE
GWRSSC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Steering Committee Minutes for the meeting held on
January 9, 2006, to be filed.
GWRSSC Non-Consent Calendar
No items were considered.
Minutes for Board Meeting 1
Page 10
02/22/06
NON-CONSENT CALENDAR
18. MOVED, SECONDED AND DULY CARRIED: (1)Adopt Resolution No. OCSD 06-03,
Certifying the Initial Study/Negative Declaration for the College Avenue Pump Station
Rehabilitation Project, Contract No. 7-47, prepared by CH2MHill; and (2)Approve the
College Avenue Pump Station Rehabilitation Project, Contract No. 747.
19, MOVED, SECONDED AND DULY CARRIED: Consideration of the following actions
regarding environmental documentation required to modify the certified 1999 Strategic
Plan Final Program Environmental Impact Report(PEIR):
(a) Receive and file Addendum No. 8 to 1999 PEIR for the Bushard Trunk Sewer
Rehabilitation, Job No. 1-24, prepared by Environmental Science Associates;
(b)Approve a budget amendment of$2,000,000 increasing the total project budget to
$65,580,000;
(c)Approve Plans and Specifications for Bushard Trunk Sewer Rehabilitation, Job
No. 1-2-4A, on file at the office of the Board Secretary;
(d)Approve Addenda Nos. 1, 2, 3, 4, and 5 to the plans and specifications;
(a) Receive and file bid tabulation and recommendation; and,
(f)Award a construction contract to Mike Bubalo Construction Co., Inc. for Bushard
Trunk Sewer Rehabilitation, Job No. I-24A, for an amount not to exceed $11,191 o500.
20. Vice Chair Ferryman declared a recess of the Board of Directors of the Orange County
Sanitation District at 8:31 p.m.
ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION
ROLL CALL
A regular meeting of the board of Directors of the Orange County Sanitation District
Financing Corporation(OCSDFC) was called to order on February 22, 2006 at 8:32 p.m., in the
District's Administrative Offices. The roll was called, Director Christy removed herself from the
room, and the Secretary reported a quorum present as follows:
Minutes for Board Meeting
Page 11
02/22/06
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Steve Anderson, Chair Steve Simonian
X James M. Ferryman, Vice Chair Arlene Schafer
X Charles Antos Paul Yost
X Don Bankhead Leland Wilson
X Carolyn Cavecche Steve Ambriz
A Alberta Christy Mike Garcia
X Larry Crandall John Collins
X Bill Delon Mark Rosen
X Doug Davert Tony Kawashima
X Michael Duvall Jim Winder
X Norman Eckenrode Constance Underhill
X Richard Freschi Bob Fauteuz
X Sukhee Kang Steven Choi
X Phil Luebben Lydia Sondhi
A Patsy Marshall Jim Dow
X Darryl Miller Douglas Reinhart
X Roy Moore John Beauman
X Joy Neugebauer Vivian Kirkpatrick-Pilger
X Ken Packer Catherine Driscoll
X Tod Ridgeway Don Webb
X David Shawver Brian Donahue
X Harry Sidhu Bob Hernandez
X Jim Silva Lou Correa
X Dave Sullivan Debbie Cook
X Mark Waldman Ralph Rodriguez
STAFF MEMBERS PRESENT: Jim Ruth, Interim General Manager, Penny Kyle, Board
Secretary; Nick Arhontes; Bob Ghirelli; Jim Herberg; Dave Ludwin; Patrick Miles; Lisa Tomko;
Lorenzo Tyner, Lilia Kovac; Jeff Reed; Layne Baroldi; Jeff Reed; Daisy Covarrubias; Mike
Moore; Mike Larkin; Paula Zeller; Simon Watson
OTHERS PRESENT: Brad Hogin, General Counsel; Larry Porter; Jan Vandersloot; Rusty
Rustan; Irwin Haydock; Eileen Murphy; Mark Miller
APPROVAL OF MINUTES
The Vice Chair ordered that the minutes of the regular meeting held June 22, 2005, be deemed
approved, as written.
Minutes for Board Meeting
Page 12
02t22106
REPORT OF THE DIRECTOR OF FINANCE
Lorenzo Tyner, Director of Finance, reported that the Financing Corporation Board is required to
meet annually.
MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. FC-03, Authorizing the
Execution and Delivery by the Corporation of an Installment Purchase Agreement and a Trust
Agreement in connection with the execution and delivery of Orange County Sanitation District
Certificates of Participation, Series 2006; Authorizing the Execution and Delivery of such
Certificates Evidencing Principal in an Aggregate Amount of Not to Exceed $200,000,000 and;
Authorizing the Execution of Necessary Documents and Certificates and Related Actions..
ADJOURNMENT: The Vice Chair declared the meeting of the Orange County Sanitation
District Financing Corporation adjourned at 8:35 p.m.
23. Reconvene, Board of Directors, Orange County Sanitation District.
24. There was no closed session.
25. Director Miller suggested further discussion on the Sanitation District's regional activity
on watershed operations.
ADJOURNMENT: The Chair declared the meeting adjourned at 8:36 p.m.
Penny M. Kyle 0 IF
Secretary to the Board of Difectors of
Orange County Sanitation District
H1dep6agenda\11oard Mlwte =6 Board Minutes\022206 minutes.Wo
Chime Paid From 01AHMS to 01115106
Warrant No. Vendor Amount Description
Accounts Pwabla-Warned
77709 Mail Life Insurance Company $ 36,506.17 Group Life,Manager Add'I.Life,Shod&Long-Tenn Disability&Optional Term Life Ins.
77710 Pioneer Americas,Inc. 35,742.66 Sodium Hypoddorile
77711 Sa0chmoe 108,901.31 SoOware-Milmsog Enterprise Desktop
77712 Southern California Edson 53,925.64 Power
77713 Teksystems 25.129.00 Temporary Employment Services
77714 Woodruff Slander&Smart 27.760.14 Legal Services MO 7-26-95
77716 Blake Anderson 32.62 Meefing/Tmining Expense Reimbursement
77716 Accounting Options,Inc 4,235.00 Temporary Employment Services
77717 American Fildelity Assurance Company 344.40 Employee Cancer Insurance
77718 Amlech Elevator Services 1.400.00 Monthly Elevator Maintenance at Pits.1&2
77719 Appleone Employment Service 17.791.78 Temporary Employment Services
77720 Keith Boger 870.00 Training Registration
77721 Basic Chemical Solutions,L.L.C. 7,738.42 Sodium B'sullite&Sodium Hydwide
77722 Black&Veatch Corporation 6,901.16 Engineering Services J-71-3
77723 Bhre Martin Group 1,356.24 Boat Parts&Supplies
=4 California Coastal Coalition 1,000.00 Membership
77725 Court Trustee 454A9 Wage Gamshment
77726 CingularWreless Airtime 473.43 Wreless Services
T7727 City of Huntington Beach 14,324.04 Water Use
77728 City of Newpalt Sea& 76.07 Water Use
77729 Compressor Components of California 4,768.00 Repair&Maintenance Services-(32)Pilot Fuel Vaves
77730 Consumers Pipe&Supply Co. 1.791.52 Plumbing Pads&Supplies
TT731 Corelink Staffing Services,Inc. 2.469.28 Temporary Employment Services
77732 County of Orange 150.00 Wage Garnishment
77M County of Orange Auditor Controller 910.00 Encroachment Permits 741
77734 County of Orange Auditor Controller 437.50 Encroachment Permits 24"4
77735 CWEA 2002 Annual Conference 180.00 Membership(California Water Environment Assocla0on)
77736 Del Mar Analytical 653.00 Analysis of Siosolkls
M37 Department of Child Support Services 300.00 Wage Garnishment
77738 Edinger Medical Group,Inc. 7,310.00 Medical Screenings
=19 Electra Bond,Inc. 1,578.54 Repair&Maintenance Services-Fusion Bond Coating to Pump Pads
7"40 Employee Benefits Specialists,Inc. 10,562A6 Reimbursed Prepaid Employee Medical&Dependent Care
7T741 Court Older 445.00 Wage Gamshment
M42 ESRI,Irrc. 1,626.96 Sohware-NT-Intel Wndows
77743 Franchise Tax Board 50.00 Wage Garnishment
T7744 Fuller Track Accessories 1,857.58 Tmdr Pads&Supplies
M45 Gold Coast Awards,ac. 25.47 Name Badges
77746 Home Depot 388.70 Misc.Repair&Maintenance Material
M47 Hope HealthA14AC 531.86 Wellness Newslehers
77748 internal Revenue Service 126.00 Wage Garnishment
77749 Intl.Union of Oper.Eng.AFI CIO Local 501 4,694.12 Dues Deduction
77750 Iron Mountain 10125 Storage Fee-Bid Document P137
77751 Kelly Paper 830.75 Paper
77752 Voided Check - -
7n53 CourtOrder 150.00 Wage Garnishment
77754 Massmulual Michel Financial Group 145Al Executive Disability Plan Premium
7T755 Materiel and Contract Services 13.392.00 Temporary Employment Services
H WeOflrf CELdtec3 P5HPRE1Clalnu Pe!E Rein Mlpme Peld Report-01-1506 EXHIBITA
rrelmo Page 1 of 8 ylpmpe
Claims Paid From 01/01106 to 01/15106
Warren No. Vendor Amount Description
M56 Court Order 225.00 Wage Garnishment
77757 MATED International,Inc. 396.00 Tralnirg Regisimlion
77758 National Bond 8 Trust 2,482.01 U.S.Savings Bonds Payroll DeduGions
77759 OCB Reprographics 5,017.91 Printing Service-MO 1126100
77760 OCFA 650.54 Dues Deduction
77761 Orange County Shane 85.00 Wage Garnishment
77762 Oxygen Service Company 228AU Specialty Gases
77763 Peace Officers Council of CA 1,593.00 Dues Deduction,Supervisors 5 Professionals
77764 Ascem Hasler Mailing Systems 262.14 Software Maintenance-Mail Manager Intellitouch System
77765 Port Supply 18.09 Life Vest Kg
7T766 Pre Paid Legal Services,Inc. 574.00 Employee Legal Service Insurance Premium
77767 Progressive Business Compliances 124.41 Posters-Labor Law
77768 Reliastar Bankers Security Lee Inc. 8,396.30 Voluntary Life In.,Cancer Ins.8 Supplemental Shan-Term Disability In.
M69 Ricoh Business System 16.18 Color Copier Lease
7777D Rudolph H.Stolz 500.00 Training Registration
77771 SARBS-CWFA 90.00 Plant 2 Operations Division Meeting Registration
=2 SBC 973.72 Telephone Services
77773 SBC/MCI 1,401.84 Telephone Services
77774 Science Applications Intl.Corp. 16,363.77 Ocean Monitoring MO 6.8-94
T7775 Smardan Supply Company 463.10 Plumbing Paris&Supplies
77776 Court Order 721.50 Wage Garnishment
77777 Snap On Tools,Inc. 1.246.59 Tools
77778 South Coast Air Duality Mgml.Dist. 57.63 Training Registration
77779 Summit Steel 1.083.31 Metal
77780 Thompson Industrial Supply,Inc. 987.84 Mechanical Paris 8 Supplies
77781 Tama Warner Communication 51.07 Cable Services
77782 Townsend Public Affairs 5.000.00 Legislative 8 Executive Advocate for Grant Funding
77783 United Way 195.00 Employee Contributions
77784 Verson California 76.68 Telephone Services
71`785 Wastewater Technology Tralners 970.00 Training Registration
77786 WEF 139.00 Membership-Water Environment Federation
777a7 Western City 381.00 Notices&Ads
77788 Xerox Corporation 17,926.80 Copier Leases 8 Managed Services
77789 Xyon Business Solutions,Inc. 18,180.00 Temporary Employment Services
77790 Court Order 597.50 Wage Gamishmenl
77791 Juan J.Ambriz 58.00 MeelingRraining Expanse Reimbursement
77792 Kemteth W.Aplon,Jr. 130.00 MeelingRraining Expense Reimbursement
77793 Deirdre E.Bingmen 182.00 MeelingRraining Expense Reimbursement
7T794 Darrin L.Caren 97.00 MeelanglTraining Expense Reimbursement
77795 Camyn V.Cavecehe 246.78 MeelingRraining Expense Reimbursement
77796 Michael D.Dwell 314.78 MeelingRraining Expense Reimbursement
77797 Richard Gallegos 195.00 MeelingRraining Expense Reimbursement
77798 Sonja Wasagren Morgan 789.38 MeelingRraining Expense Reimbursement
77799 Ray J.Reynolds 180.89 MeelingRraini g Expense Reimbursement
77800 Jeremy J.Sewn 817.76 MeelingRrainig Expense Reimbursement
77001 Curt V.Shelp 170.00 MeelingRraining Expense Reimbursement
77802 Patrick A.Sullivan 170.00 MeelirgRrelning Expense Reimbursement
77803 James G.Tinlle 55.00 MeeingRraining Expanse Reimbursement
H WepM01EXCELdvt220NPSHARMC1a1ms Paid Repma0a Mldima Pelf RepaT 01-1" EXHIBITA _.
anl21Mc Page 2 of 8 2flw2005
Claims Paid From 01/01/06 to 01115106
Warrant No. Vendor Amount Description
77604 David M.Yager 101.00 MeelirgRraining Expense Reimbursement
77805 EOUISERV 4.295.00 Emission Inspection Contract-SMOG Program&Emissions Testing
77806 South Coast Air Quality Mgml.Dist. 131.05 Employee Commute Reduction Plan Amendment Fee
77807 Ashbroolk Corporation 32,990.23 Mechanical Pads&Supplies
77808 Black&Veatch Corporation 720.621.76 Engineering Services J-102,558,J-77&P1-102
77809 Brown&Celdveil 73278.77 Engineering Services P231
77810 Carolfe Engineers 115,806.19 Professional Services P2S0
77811 City of La Habra 144,980.45 Cooperative Projects-Sanitary Sewer Master Plan
77812 GHD,L.L.C. 60.041.60 Professional Services SPA8-2
77813 Kemiron Companies,Inc. 81257.78 Ferric Chloride
T7814 Lewis&Zimmerman Associates,Inc. 26,580.02 Professional Services P2-90
77815 Malcolm Firms.Inc. 129,615.19 Professional Services 11.26&J-110
77816 Midway City Sanitary District 371200.00 Cooperative Projects-Urgent Repaint&Improvements
77817 NALCO Company 30.005.55 Anionic Polymer
77818 National Assoc of Clean Water Agencies 30,543.00 Membership
T7819 Occidental Energy Marketing,Inc. 55.353.06 Natural Gas for CenGenlCOGen
77820 Orange County Water District 78,274.65 GAP Water Use
77821 Pioneer Americas.Inc 206.376.97 Sodkmr Hypochlorile
77822 Polydyne,Inc. 66.527.91 Cationic Polymer
77523 Sancmh Engineering,Inc. 108.140.00 Construction-Manhole Rehabilitation Project
77824 Tire Ranc h0dagan Farms 275,80927 Residuals Removal MO 3.29-95
77825 US Peroxide.L.L.C. 121,177.27 Odor&Corrosion CM.Treatment for Coll.Sys.:Hydrogen Peroxide&Ferrous Chloride
77826 Denboer Engineering&Construction 188,660.00 Construction P26
77827 J F Shea Construction,Inc. 6,520,902.74 Construction P2466,J-35-2&J-77
77828 J R Filanc Construction 1,769,757.70 Construction Pl-76&P"2
77829 Margate Construction,Inc 905,390.00 Construction P1-37
77830 Morrow Meadows Corp. 130,312.00 Conslmction P2473
77831 Shasta Electric,L.P. 207,098.00 Construction SP-94
77832 Southern Contracting Company 101,422.00 Construction J331
77833 Torrey Pines Bank 42,295.00 Construction P1-76,Retention
77834 A Plus Notary Seminars,L.L.C. 138.00 Training Registration
77835 ABATIX Environmental Corp. 253.83 Lead-Specific Detergent
77836 ABB Automation,Inc 565.00 Repair&Maintenance Services-Transmitter
77837 Absolute Standards,I= 66.00 Lab Paris&Supplies
77838 Accounting Options,Inn 3.652.00 Temporary Employment Services
77839 ACCU Sludge 372.65 Lab Paris&Supplies
77840 Advance Business Graphics 1.463.60 Printing Services-Forms
77841 Airgas Safety,Inn 12.483.18 Safety Supplies
77842 Allied Packing&Rubber,Inc. 72.29 Tubing
77843 AUsleel.Inc.do lntsservice 9,240.10 Installation of Office Work Stations&FumOure-Division 860
77844 AMTECH Elevator Services 2,700.00 Monthly Elevator Maintenance at PIM.1&2
77845 Analytical Products Group,Inc. 695.00 Lab Pens&Supplies
77846 Appleone Employment Service 9,350.13 Temporary Employment Services
77847 Applied Industrial Technology 491.20 Mechanical Parts&Supplies
77848 Aquarium Doctor 110.83 Human Resources Aquarium Service
77849 Aquatic Bioassay And Consulting Labs,Inc. 1,570.00 Bioassay Testing&Mote Effluent Toxicity Testing
77850 Arch Wireless 630.61 Paging Service-Airtime,Service&Equipment
77851 Aurora Pictures,Inc. 431.00 Safety Videos
H Wepfh CELLIeQMWPSf RE Wlma Pad flepwn0atMC1e1ms PM.Repml-m-1509 EXHIBIT
a,dzlpa Page 3 of 8 211..
Claims Paid From 01101106 to 01118108
Warrant No. Vendor Amount Description
77852 Awards&Trophies Company 99.76 Awards&Trophies
77863 AWSI 166.00 Department of Transportation Program Management&Testing
77854 Joyce Bristow 528.43 User Fee Refund Regarding Septic Tanks
77855 Baker Tanks 1,492.00 Tank Rentals
77856 Baal.Chemical Solutions,L.L.C. 16,161.41 Sodium Simulate&Sodium Hydroxide
77867 Battery Specialties 963AI Batteries
77856 BRIG Business Machines Consultants,Inc. 1,914.72 (1)Stapling Slacker for HP9000 Multifunctional Copier/Scanner
77859 Bush&Associates,Inc. 12,42D.00 Professional Services 1-98,7-36&741
77860 City of Huntington Beach 11,949.75 Cooperative Projects-Hamlllon/Banning Tributary Area Sewer Study
77861 California Recreation Company 2.696.43 Boal Slip Rental Fees for Oman Monitoring Vessel Nedssa
77862 California Relocalion Services,Inc. 300.00 Office Files Moving/Relocation Services
77863 CAPPO Conference Registration 775.00 Purchasing Meeting Regielralion
77864 Celli 262.69 Phones&Accessories
77865 CEM Corporation 386.56 Lob Paris&Supplies
77866 Cole Farmer Instrument Co. 640.38 lab Parts&Supplies
77867 Compressor Components of California 1,248.00 Repair&Maintenance Services-(32)Coils LSV8 Ignition
77MB Conrad&Assaaales.L.L.P. 17,258.00 Professional Services-Financial Auditing Services
77869 Consolidated Elect.Distributors,Inc. 450.36 Electrical Pads&Supplies
77870 Consumers Pipe&Supply Co. 421.18 Plumbing Pens&Supplies
77871 Controlled Motion Solutions 1,051.87 Electrical Pads&Supplies
77872 Cooper Canadian Corporation 325.10 Engine Supplies
77873 Corporals Business Interiors 11.160.02 Miscellaneous Office Fumilure
77874 Corporate Express 3,674.65 Office Supplies
77875 Coporate Image Maintenance,Inc. 160.00 Custodial Services Spec.No.9899419
77876 Counterpart Enterpnces,Inc. 5,830.67 Mechanical Pads&Supplies
77877 County Wholesale Electric Co. 2,092.84 Electrical Parts&Supplies
77878 CSMFO Annual Conference 750.00 Acmunling Division Meeting Registration
77879 CWEA 2002 Annual Conference 155.00 Training Registration(California Water EmArommenl Association)
77880 CWEA Membership 825.00 Training Registration(California Water Environment Association)
77881 CWEA Specialty Conference 505.00 Training Registration and Environmental Science Lab Division Meeting Registration
77882 Dapper The Co. 5,130.73 Truck Tires
77883 Davids Tree Service 8,495.00 Tree Maint.Service
77884 Del Mar Analytical 8,081.00 Outside Lob Services
77885 Dosed Pumps&Parts,Inc. 15,446.56 Pump It Pump Paris&Supplies
77886 Detection Instruments Corporation 497.54 Instrument Pads&Supplies
77887 Dezudk Water Conlrole 489.67 Plumbing Paris&Supplies
77888 DGA Consultants,Inc. 6.685.75 Professional Services-CCTV Data Evaluation&Support
77889 DIAL Express USA,Inc. 21.39 Freight Services
77890 Dresser-Rand 118.68 Mechanical Pads&Supplies
77891 Dunn Edwards Corporation 108,46 Paint Supplies
77892 Ecology Control Industries 2,951.02 Hazardous Waste Disposal
77893 Electronic Data Solutions 62.22 Lob Paris&Supplies
77894 Enchanter,Inc. 1,700.00 Oman Monitoring&Curtail Inspection&Maintenance
77895 Environmental Compliance Inspection 1.040.00 Professional Services-Grease Interceptor lmpeciions-FOG
77896 Ewing Irrigation Industrial 197.34 Landscape Irrigation Paris&Supplies
77897 Full Spectrum Analytim 633AO Instrument Repair&Maintenance Services
77698 Familial Corrosion Control Co. 3,873.62 Instrument Pens If Supplies
77899 Filterline Corporation 110.96 Filled;
N Wephin1E%CEL EOUNPAP5HARE1Clal as POW Rp0d10aaMI.Ima Paid now-01-1am EXHIBIT A
aw210%, Page/of0 MU20 .'
Claims Paid From 01101/06 to Dill WOO
Warrant No, Vendor Amount Description
77900 Fisher Scientific 10,509.27 Lab Parts&Supplies
77901 Foodcraft Coffee&Refreshment Services 1,377.50 Meeting Supplies
77902 Fountain Valley Palms,Inc. 122.19 Paint Supplies
77903 Franklin Cmmy 376.37 Office Supplies
77904 Frisco Profiles 592.00 Human Resources Background Checks
77905 Garland Manufacturing Co. 455.14 Mechanical Pads&Supplies
77906 Garret Callahan Company 2.670.50 Chemicals
77907 GBC General Binding Corp. 40.40 Office Supplies
77908 Gemarels,Inc. 3,711.9E Sparc PlugwLSVB Engine
77909 Golden Stele Water Company 74.19 Water Use
77910 Guldenwesl Window Service 440.00 Landscape Maintenance
77911 Grainger,Inc. 2,225.11 Mechanical Parts&Supplies
77912 Haaker Equipment Company 4.323.66 Misc.Vehicle,Parts,Repairs&Service
T7913 Hach clo Parton Industries 127.32 Mechanical Parts&Supplies
77914 Harold Primroes Ica 120.00 Ice For Samples
77915 Harrington Industrial Plastics,Inc. 750.75 Plumbing Supplies
77918 Hatch&Kirk,Inc. 2.497.34 Truck Supplies
77917 Hl Standard Autonxdhre 1,297.B5 Automotive Paris&Supplies
77918 Hill Brothers 23,813.44 Chemicals-Odor&Corrosion Control-Newpod Tnmkline
77919 Hill,Inc. 1,30842 Hardv`are
77920 Home Depot 1,286.02 MI=Repair&Maintenance Materiel
77921 Horizon Technology 3,791.08 Lab Parts&Supplies
77922 Hose Express.L.L.C.dba Pidek Santa Ana 2.808.41 Mobile Hoes Service
77923 Hub Auto Supply 1,182.55 Vehicle Pads&Supplies
77924 City of Hunlirglun Beach 31.02 Water Use
77925 HWA Sales 2,213.55 Electrical Pads&Supplies
77926 Industrial Distribution Group 780.73 Tools&Supplies
77927 Interservice,TFS,Inc.clo SFI Warehouse 2,426.95 Office Furniture-(3)Freedom Chairs
77928 Interstate Batteries of Cal Coast 1,596.43 Batteries for Vehicles&Ceda
77929 hrvensys Systems.Inc. 5,760.44 Electrical Pads&Supplies
77930 Imnman Pads&Services 27.00 Air CondBioner Filters
77931 J&L Industrial Supply 747.63 Tools
77932 J R Blanc Construction 15,305.10 Repair&Maintenance Services-Media Parking of(1 B)Scrubbers at Pits.1 &2
77933 Jamison Engineering Contractors,Inc 7.100.00 Repair&Maintenance Services-Water Leak&Sub-Flooring at PIL 2 Consl.Trailer
77934 Jays Catering 1,776.95 Meeting Expenses
77935 JPR Systems,Inc. 637.22 Gas Liquid Separator
77936 Keith Boger 375.00 Training Registration
77037 10ainfeider,Inc. 2.114.00 Soils,Concrete&Otter Materials Testing
77935 Phmaledge Point 4,620.00 Software Malnl.
77939 Jerry Llnkhad 1.017.51 User Fee Refund Regarding Septic Tanks
77940 Lab Safety Supply,Inc. 163.32 Lab Safety Supplies
77941 LECO Corporation 14.115.26 Instrument Repair &Maintenance Services-Pegasus S/N 3144
77942 Lee&Ro,Inc. 20,862.66 Professional Services 5-51&5-52
77943 Lifecom Be",Inc. 1,021.73 Specialty Gases
77944 LINJER 5.442.39 Professional Service-DART MO 9.22-99
77945 Lucci's Gourmet Foods,Inc. 172.93 Meeting Expense
77946 Lustre Cal 726.48 Waslehauler Decal Stickers
77947 Maintenance Technology Corp. 221.63 Mechanical Parts&Supplies
HNeprVm£xcEL.Man12o SHARElLUma Pisa Repemaeonamms reed Rerud-M-1a Page pa EXHIBITA
OW21Mc 9 vtama6
Claim Paid From 01101106 to 0IMS106
Warrant No. Vendor Amount Description
77948 Mi n tic Motors 75.00 Toning Services
77949 Material and Contract Services 4,464.00 Temporary Employment Services
77950 MBC Applied Environmental Sciences 3,191.34 Professional Services-Kelp Beds Aerial Survey
77951 McMaster Can Supply Co. 3,977,38 Mechanical Parts B Supplies
77952 Meinhand Glass Products 845.00 Lab Pads 8 Supplies
77953 Mesa Products,Inc. 1,055.16 Instrument Pads 8 Supplies
77964 Mine Safely Appliances Company 1,376.51 Electrical Pads 8 Supplies
77955 Motion Industries,Inc.CA 55 270.02 Electrical Parts 8 Supplies
77956 MWH Americas,Inc. 11,996.41 Professional Services P2-74
77957 NACE Internalional 140.00 Membership
77958 Nalional Plant Services,Inc. 14,157.54 Vacuum Truck Services
77959 Neal Supply Co. 640.64 Plumbing Supplies
77960 NeNersant of Southern Celifomie 11,146.80 Security System Maintenance
77961 New Horizons C.L.C.of Santa Ana 845.00 Training Registration
77962 Office Depot Business Services Div. 1,792.97 Office Supplies
77963 Omega lndnsInal Supply.Inc. 1,132.28 Janitorial Supplies
77964 Onesource Distributors,Inc. 563.69 Electrical Pads A Supplies
77965 Grade Corp. 4,928.62 Training Reg.8 Software Support Renewal-Oracle Enterprises 8 Internet Developer
77966 Orange County Sanitation District 15.303.86 Workers Comp.Relmb.
77967 Orange County Pest Conbol,Inc. 278.11D Past Control
77968 Orange County Vector Control District 122.34 Past Control
77969 Orange Fluid System Technologies,Inc. 392.09 Plumbing Pads 8 Supplies
77970 Oxygen Service Company 4,145.83 Lab Specialty Gases
77971 PAC 1,089.40 Lab Pads 8 Supplies
77972 Pacific Mechanical Supply 2.757.14 Plumbing Pads 8 Supplies
77973 Parker Supply Company 682.99 Mechanical Pads 8 Supplies
77974 Parkhouse Tre,Inc. 209.34 Time
77975 Partners Consulting Services 8.207.00 FIS On-Site Support-Help Desk
T7976 PCG Industries 11,225.00 Repair 8 Maintenance Services-Refurbish 6 Chrome(2)Mono-Flo Pump Rolo s
77977 PCS Express,Inc. 122.00 Courier Service
77978 Permaeeal 449.96 Luba Oil
77979 Pice Rivers Pallet,Inc. 2,648.51) Repair B Maintenance Materials-(200)Pallets
77980 Pmxelr Distribution,Inc. 16.30 Demurrage
77981 Pradesh,Inc. 417.95 Lab Parts 8 Supplies
77952 Primary Source Office Furnishings,Inc. 660.51 Office Furniture
77983 Ismcam Work Injury Center 124.25 Medical Screenings
77984 Propipe 12.061.16 CCTV Sewedine Inspections
77985 Prudential Overall Supply 4.821.59 Uniforms 8 Related Articles
77986 Quinn Power System Assoc. 3,304.32 Repair 8 Maintenance Same,-Prepare Caterpillar Generator for Long-Term Storage
77987 R L Abbott 8 Associates 3,000.00 Kam County Siosolids Consulting Services
77988 Rainbow Disposal Co. 2,973.12 Trash Removal
77989 Ralnin Instrument,L.L.C. 194.68 Lab Instrument Repairs
77990 Raven Biological Laboratories 98.87 Lab Pads 8 Supplies
77991 RBF Engineers 8,784.96 Professional Services 7-38
77992 Red Wing Shoes 428.60 Safety Shoes
77993 Regislror Air 8 Waste Management Assoc. 165.00 Membership
77994 RMS Engineering 8 Design,Inc. 3.125.00 Professional Servlce r P2416-3
77995 RTM Lighting 8 Efeclronic5,Inc. 4,223.80 Electrical Pads 8 Supplies
X wep11nn1ExCELAIM22MPSHAREClelms Paid RepixAO" Clelms Paid Repad-01-I506 EXHIBIT
nnnnso Page 6 of 8 racdoe
Claims Paid From 01/01106 to 01115106
Warrant No. Vendor Amount Description
77996 SARBS-CWEA 290.00 Training Registration
77997 SSC/MCI 736.70 Telephone Services
77998 Schiff Associates 6,020.82 Professional Services J-106&P2-66
77999 Schwing America,Inc. 3.142.07 Pump Paris&Supplies
78000 Science Applications Ind.Corp. 17,619.49 Ocean Monitoring MO 6.8-94
78001 Scoltel Voice&Data.Inc. 2.284.80 Telephone System Maintenance
78002 Be.Bird Eledromm,Inc. 417.00 Lab Equipment Maintenance&Calibration Services
78003 Seavisual Consulting,Inc. 20,430.00 Professional Services-Strategic Promise Studies
7SCD4 Shamrock Supply Co..Inc. 83.90 Centrists Mi.&Hand Cleaner
78005 Sigma Aldrich,Inw 299.38 Lab Paris&Supplies
7800E Smith Pipe&Supply 326.22 Landscape Irrigation Supplies
78007 Snap On Tools 105.00 Tools
78008 SoOchoice Corp. 408.15 Soft am
78009 Southern California Edison 5.579.94 Power
78010 Southern Counties Lubricants 3.952.95 Hydraulic Oil
78011 Stalkless 1.753.12 Drinking Water/Cooler Rentals
78012 Spec Services,Inc. 17.845.00 Engineering Services J-33-1
78013 Summit Steel 3.521.73 Metal
78014 Sunset Industrial Pads 1,945.97 Mechanical Paris&Supplies
78015 Technical Service Group,Inc. 1,381.60 SCADA System VAX Service Agreement
78016 George Tibbetts 1,437.79 User Fee Refund Regarding Septic Tanks
78017 Tekayatems 2,337.00 Temporary Employment Services
78018 Teledyne RD Instruments,Inc. 1,163.70 Battery Packs
78019 TerminiX International 1.954.00 Pest Control
7B020 Centre for Organization Effedyrenes 1,676.00 Professional Services-Cultural Assessment&Organizational Improvement Projed
78021 The Orange County Register 108.61 Notices&Ads
78022 Thermo Electron Corp. 1.410.22 Lab Pads&Supplies
78023 Thompson Industrial Supply.Inc. 2.563.61 Mechanical Pads&Supplies
78024 TMobile 111.31 Willem Services
78025 Tanya Lock&Safe Service&Saba 249.13 Locks&Keys
78026 Traffic Control Service,Inc. 815.30 Traffic Safety Equipment
78027 Truck&Auto Supply.Inc. 1.095.15 Automotive Supplies
78028 US Filter Corp. 1,593.00 Service Agreement-DI Water System at Pit.1&PIL 2
78029 UUm 185.73 Truck Pads&Supplies
78030 Underground Service Alen of So.Calif 1,474.05 Membership-Underground Utility Identification/Notification Service
78031 The Unlwurce Corporation 10.307.67 Office Supplies
78032 Ended Pacific Services,Inc. 11,318.99 LaMscape Maintenance at Plants 1&2 and Pump Stations
78033 United Parcel Service 140.n Parcel Service
78034 United Pumping Service 4,068.21 Pumping Service
78035 US Aircondilioning Distributors,Inc. 856.61 Molar
78036 US Equipment Co.,Inc. 1,363.87 Coolant
78037 Vales Plumbing 550.00 Service Contract-Baellow Device Repairsifteplacomenl
78038 Vale.Corp. 1,404.24 Door Repairs-Warehouse Roll-Up Door
78039 VWR Scientific Products 782.32 Lab Paris It Supplies
78040 The Wackenhut Corporation 11,954.93 Secady Guards
78041 Wally Machinery and Tool Supply,Inc. 167.01 Mechanical Pads&Supplies
78042 Waste Markets Corp. 16,553.93 Mainl.Agree,-Grit&Screenings Removal&Digester Mat'I Removal
78043 Waslewaler Technology Trained, 2,690.00 Training Registration
H aePMe@XmLEIeV zzWiSW1RE Cu[r s Petl RepnM6pTCWms Paid Report-01-I5Po EXHIBIT A
swzi. Page 7 of 8 x11. fi
Claims Paid From 01/01N8 to 01/15/06
Warrant No, Vendor Amount Description
78044 Waste Sanitary Supply 136.77 Janitorial Supplies
78045 WCR Incorporated 906.52 Mechanical Paris 8 Supplies
78046 WEF 364.00 Membership-Water Environment Federation
78047 West Life Supply Company,Inc. 637.36 Electrical Paris 8 Supplies
7BD48 Weston Solutions,Inc 14,055.00 Outside Laboratory Analyses
7SD49 Xyon Business Solutions,Inc. 4,687.50 Temporary Employment Services
78050 Cafdamia Bank B Trust 5.338.00 Construction J-334A,Retention
78051 Obson Construction,Inc. 3.252.00 Construction P242
711052 Orange CommuMty Bank 361.00 Construction P2E2,Retention
78053 South Coal Air Quality Management Dist 740.00 Permit Fees-Annual Emission,Operation$Misc.Fees
78054 Layne T.Baroldi 270.90 MeelingRraimng Expense Reimbursement
]BOSS Peter Chaffs 53.00 Meeting/-raining Expense Reimbursement
78056 James E.Colston 40D.16 Meefing/fmining Expense Reimbursement
78057 Michele Farmer 2.019.98 Meeting/Tmining Expense Reimbursement
78058 Robed P.Ghmelli 183.60 Meeting/Training Expense Reimbursement
78059 Doug Rulison 685.55 Meeting/framing Expense Reimbursement
78060 South Coast Air Quality Management Dist. 201.50 Registration Fee-Rule 1415 Stationery Refrigeration 8 Air Conditioning System
78081 County of Orange Auditor Controller 1,005.00 Adminisration Fees-Adjustments to Property Tax Bills
78062 County Of Orange Auditor Controller 525.00 Administration Fees-Adjustments to Property Tax Bills
78063 Orange County Sanitation District 770.81 Pelt'Cash Reimb.
78064 South Coast Air Quality Management Dist. 675.00 Permit Fees-Portable Equipment Pmgram Registration
78065 ASCE Continuing Education 2,277.00 Training Registration
78066 League of California Cities 175.00 Membership
78067 Netvemant of Southern CelHomia 6,697.89 Software-Picture Perfect Server Upgrade
78068 Cade D.Dillon 125.00 Meetingrrraining Expense Reimbursement
Total Accounts Payable-Warrants $ 13,801,739.27
Payroll Disbumments
32236 - 32338 Employee Paychecks $ 154.949.11 Biweekly Payroll DI/M4/2006
32339 - 32469 Employee Paychecks 142.339.54 Voided Check.Leave Reversal,Leave Payouts,IIS Payments
32562- 32562 Employee Paycheck 3,318AS Voluntary Termination'
120622 -121187 Owed Deposit Statements 1,073,288.10 Dbed Deposit Statements 01/04/06
Total Payroll Disbursements $ 1,373,094.94
�hwas324ro-32ssty p WdtwpWn 10111=5pTd.Wbamwai.minim...mn.
Wire Transits,Faster,
OCSD Payroll Tares 8 Contributions $ 646,939.45 Biweekly Payroll WI =
JP Mogan Chase Bank 138.099.17 Series 1993 Refunding COPa December Interest Payment
Total Whe Transfer Payments 3 785.038.62
Total Claims Paid 01/01106-01/15106 $ 15,960.6]2.83
H:Weofyrr EXCEL4WIZgOP$HARE1d.Ims Pxd RepwMBe7rClelm.Pro Report-Ot-15-06 EXHIBILA
na21M Page 8 of 8 VIM"
Claims Paid From 0111O106 to 01/31/06
Warrant No. Vambr Amount Description
Accounts Payable-WaynerM
78069 So.Cat Gas Company S 29,384.60 Natural Gas
78070 South Coss[Air Quality Management Dist. 28.493.21 Annual Emission&Toxic Air Containments Fee
78071 South Coast Air Quality Management Dig. 35,345.43 Annual Emission&Toxic Air Containments Fee
78072 Ararat Construction Company,Inc. 155,299.50 Construction P162
76073 Air Products&Chemicals,Inc. 24,500.00 O&M Agreement Oxy.Gen.Sys.MO 8-869
78074 Alhambra Fountlry,Co.,Lid. 4,968.35 Manhole Frames&Covers
78075 Applied Industrial Technology 64.09 Mechanical Pads&Supplies
78076 ASIS International 150.00 Membership
78077 American Telephone&Telegraph Corp. 31.19 Telephone Service
78078 Baker Tenka 1.131.20 Tank Rentals
78079 Couryo(Orenge 595.75 Mainl.Agreement-Repairdirstallalion of Base Handheld&Vehicle Radios
78080 Court Trustee 90.89 Wage Garnishment
78081 California Relocation Services,Inc. 187.50 Office Files MovinglRelpcetion Services
78082 Carolle Engineers 7,156.00 Professional Services P1-37
78083 Chgular Wireless Airtime 6,155.45 Wireless Services
78084 Commercial Transportation Services 175.00 Training Registration
78086 County of Orange 150.00 Wage Garnishment
78086 Culligan of Orange County 478.12 Maint.Agreement-Can Gen Water Softener System
78087 CWEA 295.00 Operations Plant 2 Division Meeting Registration
78088 DAC(Digits)Asaumnce Cedification) 1.500.00 Professional Services-Dissemination Services&Secured Site Bulletin Board Posting
78089 Davids Tree Service 1,300.00 Tree Mead.Service
78090 Department of Child Support Services 300.00 Wage Garnishment
78091 DIRECTV 359.00 Subscription
75092 Dun&Bradstreet,Inc. 9.658.00 Reporting Services-Capital Improvement Program Bidder Responsibility Evaluation
78093 Employee Bene61S Specialists,Inc. 10,653.23 Reimbursed Prepaid Employee Medical&Dependent Care
78094 Environmental Resource Assecialion 76.69 Lab Pads&Supplies
78095 Court Order 445.00 Wage Garnishment
78096 Fedex Corporation 154.33 Freight Services
78097 Franchise Tax Board 50.00 Wage Garnishment
78098 Franchise Tax Board 106.00 Wage Garnishment
75099 Garland Manufacturing Co. 1,138.67 Mechanical Pads&Supplies
78100 IBM Corporation 2.375.00 Training Registration
78101 Internal Revenue Service 126.00 Wage Garnishment
78102 IBM Corporation Way 5,103.66 Maintenance Agreement A6400
78103 Ind.Union of Oper.Erg.AFL CIO Local 501 4,645.62 Dues Deduction
78104 more Ranch Water District 5.45 Waker Use
78105 ISEC,Inc. 7,233.00 Professional Services-Remodel at Lab Room 227
79106 Jamison Engineering Contractors,Irm 2.131.00 Repairs&Maintenance Services-Primary Clarifiers P&O
78107 Liebed Cassidy Whilmom 2.390.00 Annual Membership&Training Workshops-OC Employ.Relations Consortium
78108 Court Order 150.00 Wage Garnishment
76109 Luca's Gourmet Foods,Inc. 119,94 Meeting Expense
78110 McMaster Can Supply Co. 203.43 Polyethylene Rackable Pallet
76111 Court Order 225.00 Wage Garnishment
78112 National Bond&Treat 2,732.01 U.S.Savings Bonds Payroll Deductions
76113 NWRI National Wale,Research Institute 325.00 Environmental Compliance Services Division Meeting Registration
78114 OCB Reprographics 3,468.78 Printing Service-M01/261OU
78115 OCFA 650.64 Dues Deduction
78116 Orange Candy Sheriff 85.00 Wage Garnishment
78117 Patrol Video Pmduchoos 452.23 Video&Editing Services
75118 Peace Officers Council of CA 1,602.00 Dues Deduction,Supervisors&Professionals
XMepnPnIEXCELdra132PAPSM PCI®ma Pan!RepoT➢&OTCnlme Pets Pepin-0IJ1-06 EXHIBITS
flMlask Page 1 0f 7 Inmopa
Claims Paid From 01/76/09 to 01131/06
Warrant No. Vendor Amount Description
78119 SARBS-CWEA 90.00 Operations Plant l Division Meeting Registration
78120 SBC 1.611.07 Telephone Services
78121 SBCIMCI 28.82 Telephone Services
78122 SCESA 185.00 Membership
78123 Scott Specialty Gases,Inc. 12025 Demurrage&Cylinder Rental
78124 Shamrock Supply Co.,Inc. 519.62 Plumbing Pads&Supplies
78125 Court Order 721.50 Wage Garnishment
78128 Southern California Edison 1,877.07 Pourer
78127 U 5 Bank 4.314.06 Annual Administrative Fee Re 1992 Refunding Cerlificales of Participation
78128 United Way 195.00 Employee Contributions
78129 Verl California 123.32 Telephone Services
78130 Village Nurseries 220.33 Landscaping Supplies J-36
78131 Wastewater Technology Trainers 870.00 Training Registration
78132 WEF Registration Dept. 630.00 Project Management Office Meeting Registration
78133 Wright Way Developments 435.00 Instrument Repair&Maintenance Services
78134 Xemx Corporation 858.00 Fax&Copier Leases
78135 Court Order 597.50 Wage Garnishment
M136 1-800-Conlerence(R) 498.16 Conference Telephone Cells
78137 24 Garrote 188.89 Meeting Expenses
78138 Thomas M,Stands 239.11 Meeling/fralning Expense Reimbursement
78139 James A.Caner 130.00 MeelingRraining Expense Reimbursement
711140 Fred J.O'Brien 199.82 MeetingRraining Expense Reimbursement
79141 County of Orange Auditor Controller 840.00 Administrative Fees-Adjustments to Property Tax Bills
78142 Spurt Coast Air Quality Management Dist. 640.00 Portable Equipment Registration Program Fee
78143 City of Fountain Valley 2.315.78 Building Permit Fee JA8
781" City of Fountain Valley 2,097.73 Building Permit Fee JA8
78145 Plan Clark-Atkins Water 40,320.00 Anaerobic Baffled Reactor(ABR)Testing
78146 American Express 25.901.55 Purchasing Card Program.Miss.Supplies&Services
78147 Black&Veatch Corporation 580,865.42 Engineering Services PI-76,J-77&P1.102
78146 Blue Cross of CalBomia 385,943.05 Medical Insurance Premium
78149 California Soil Products 32,900.79 Residuals Removal MO 3.29.95
711150 Camp Dresser&Mckee,Inc. 104,919.65 Engineering Service J-71A
78151 City of Fountain Valley 36.607.71 Water Use
781M Della Dental 58,709.79 Dental Insurance Plan
78153 Environmental Engineering&Contracting 26,000.00 Prof.Services-Preparationfrraining-Indus.Wastewater hmt.Operator Trig.Course Vll
78154 Earth Tech,Inc. 44.617.30 Professional Services P2-79
78155 Geomatdx Consultants,Inc. 27,160.00 Soils,Concrete&Other Materials Testing
78156 Innedine Engineering 37,470.65 Video Inspections of Seva dine Segments for Damage,Infiltration&Illegal Connections
78157 IPMC c/o Parsons 1,159,562.00 Eng.Sm.-Integrated ProgramlProject Mgmt.,Tamp.Slatting,Materiels&Supplies
78158 Kaiser Foundation Health Plan 68,455.89 Medical Insurance Premium
78169 Kemlron Companies,Inc. 207,993.31 Ferric CMeride
78160 Lee&Ro,Inc. 40.370.09 Professional Services 5.51,5.52&549
78161 Malcolm Pimie,Inc. 414.943.91 Professional Services J-79,P2A0&11-26
78162 MWH Americas,Inc. 43,434.81 Professional Services J-101
78163 Pioneer Americas,Inc. 249,844.70 Sodium Hypochlonte
78164 RMS Engineering&Design,Inc. 24,072.55 Englneemg Services J-96
78165 Sancon Engineering,Inc. 47,726.00 Manhole Rehabilitation Program
78166 Tula RancluMagan Forme 255.450.34 Residuals Removal MO 3-29-95
78167 US Metro Group,Inc. 29.222.50 Janitorial&Floor Maintenance at Plants 1 &2
711165 US Peroxide,L.L.C. 106.439.4.5 Odor&Corrosion Ctd.Treatment for Coll.Sys.;Hydrogen Peroxide&Fenoue Chloride
78169 Ararat Construction Company 60.295.40 Construction PI 42
H.WepMInE%CEL.auUfpNPSHMflCWms Paid Rxprsos-o LWmr Paid Report-0141-06 EXHIBIT
wvtora Page 2 of 7 ymrzoba
Claims Paid From 01/16/06 to 01/31/06
Warrant No. Vendor Amount Description
78170 ARE,Inc. 213,705.00 Construction 7-36
78171 Dollar&Some Constructions,Inc. 251,357.21 Construction P2-66-2 It J-88
78172 Ken Thompson,Inc. 202,047.30 Construction 2<14B
78173 Klewil Pacific Co. 824,787.00 Construction 6.51
78174 Margate Construction,Inc. 118,774.69 Camtruci on J417
78176 Senn Engineering,Inc. $7,379.20 Construction 7.21
78176 Wells Fargo Bank Mac C7300-M2 91,843.00 Construdlon 5.51&542,Retention
78177 LA Chemical 3,699.20 Bleach
78178 AW Chesterton 6,018.65 Mechanical Seals
78179 ASS Automation,Inc. 818.00 Repair&Maintenance Service-Flow Meter
78110 Abrasive Engineering Tools&Equipment 147.21 Mechanical Pars&Supplies
78181 Absolute Standards,Inc. 54.00 Lab Pare&Supplies
78162 ACCU Sludge 460.51 Lab Pads If Supplies
78183 ACE Ergonomics 1,5513.00 Professional Services-Ergonomic Workstation Evaluations
78184 Agtient Technologies,Inc. 622.84 Lab Parts&Supplies
76185 Air Products&Chemicals,Inc. 24,500.00 O&M Agreement Oxy.Gen.Sys.MO B-8-89
78186 Airgas Safety.Inc. 2,955.33 Safety Supplies
78187 American Chemical Society 142.00 Membership
78188 American Concrete Institute 126.50 Publication
78189 AMTECH Elevator Services 1.400.00 Elevator Rapeirs&Maintenance Agreement
78190 American Telephone If Telegraph Corp. 25.67 Telephone Service
78191 Awards&Trophies Company 75.97 Awards&Trophies
78192 Baker Tanks 1,652.00 Tank Rentals
78193 Basic Chemical Solutions 22,174.97 Sodium Bisulfile&Sodium Hydroxide
78194 Baywoud,Inc. 148.71 Misc.Boat Pads&Supplies-Nantes
78195 Bell Pipe&Supply Co. 17.62 Piping Supplies
78196 Buckram&Associates,Inc. 1,121LGO Professional Services-Payment Management
78197 California Municipal Statistics,In. 500.00 Debt Statement-2006 Certficares of Participation Dated 17J3V05
78198 Martin Boyer Co,Inc.do Cambridge 6,825.00 Prof.Services-Workers'Compensation Claims
78199 Cardlock Fuel Systems,Inc. 14.146.82 Fuel Card Program-District Vehicles&Monitoring Vessel
78200 Cad Warren&Co. 448.71 Insurance Claims Administrator
78201 CASA 2,750.00 General Management Division Meeting Registration
78202 Casual Gourmet 72.41 Meeting Expenses
78203 Cingular Wireless Airtime 8,198.71 Wireless Services
7a204 City of Tuslin 873.52 Water Use
78205 CMAA 85.00 Training Registration(Construction Management Association of America)
78206 Coast Fire Equipment 1,290.23 Annual Fire Eidinguisher Inspection&Servicing at Ptis.1 If 2 and Pump Stations
76207 Computer Sciences Corp. 822.54 Consulting&Lab Services-Assay Pilot Project
78208 Consolidated Reprographics 61.38 Printing Services
78209 Consumers Pipe&Supply Co. 1.916.78 Plumbing Pads&Supplies
78210 Controlled Mutton Solutions 161.72 Mechanical Pens&Supplies
78211 Cooper Cameron Corporation 2,297.11 Engine Supplies
78212 Corporate Express 1.204.09 Office Supplies
78213 Corech Engineering 2,050.86 Pump Pads&Supplies-Impeller
78214 County of Orange Auditor Controller 2,309.00 Encroachment Permit 741
76215 County of Orange Auditor Controller 2.672.00 Encroachment Permit 741
78216 CR&R,Inc. 2,520.00 Container Rentals
78217 Culligan of Orange County 42.80 Meint.Agreement-Can Gen Water Softener System
78218 Cummins Cal Pacific,L.L.C. 569.85 Tank Heatem
78219 Custom Control Sensons 249.99 Electrical Pads&Supplies
78220 CWEA Membership 200.00 Membership(CaIB.Water Environment Assoc.)
H WeprAnl XCEL KaU20W iSMARP.CIeLns Paid RepM9ednClain a Paid Fusco-01-31-06 EXHIBIT B
On7 W1c Page 3 of 7 yl0gme
Claims Paid From 01116/06 to 01131M
Warrant No. Vendor Amount Description
78221 Dangdp Company,Inc. 1,719.69 Valves
78222 Oavids Tree Service 7225.00 Tree Maim.Service
78223 DOB Engineering,Inc. 875.00 Professional Services-Grant Management
78224 Dennis Greenberger,Ph.D. 187.50 Professional Services-Fit for Duty Exam
78225 Dezudk Water Controls 116.56 Mechanical Paris&Supplies
78226 DHL Express USA,Inc. 52.47 Freight Services
78227 Dionex Corporation 350.58 Lab Pads&Supplies
78228 E Sam Jones Disldburors,Inc. 177.79 Elecincal Pads&Supplies
78229 Employers Group 200.00 On-Site Training-Loaves of Absence
782M Employee Benefits Specialists,Inc. 616.70 Reimbursed Prepaid Employee Medical&Dependent Care
78231 Employers Group 1,200.00 On-Site Training-Customer ServicefTelephone Skills
78232 ENS Resources,Inc. 10,000.00 Professional Services-Legislative Advocate
78233 Envimnmenml Compliance inspection Svcs. 2,120.00 Professional Services-Fats,Oil Grease(FOG Program)Inspections
78234 Environmental Resource Association 1,416.58 Lab Pads&Supplies
75235 ESRI,Inc. 777.00 OnShe Training-ArcGIS Software
78236 Ewing Irrigation Industrial In.57 Landscape Irrigation Pads&Supplies
78237 Fedex Corporation 1,881.87 Freight Services
78235 Ferguson Emerpnses,Inc. 1,086.12 Valves
78239 Fisher Scienlific Company,L.L.C. 4,707.25 Lab Pads&Supplies
78240 Forked Engineering&Surveying,Inc. 4,730.25 Engineering Services 5.51,5.52&Pi-102
78241 Fountain Valley Rancho Hand Wash 760.00 Vehicle Washing&Waxing Services
79242 Franklin Covey 54.39 Office Supplies
78243 Wendy Greene 1,163.85 User Fee Refund Regarding Septic Tanks
782" Gemardts,Inc. 2.132.94 Mechanical Pads&Supplies
78245 Gelinge Castle 1,098.00 Lab Instrument Maintenance Agreement
78246 Goklemvesl Wmdow Selves 2,470.00 Landimpe/Hardscape Maintenance Services
78247 Grainger,Inc. 4,345.11 Electrical Paris&Supplies
78248 Guarantee Records Management 302.93 OR-Site Records Storage
78249 Haaker Equipment Company 277.47 Misc.Vehicle,Pads,Repairs&Service
78250 Hach cio Pollan Industries 958.74 Lab Pads&Supplies
78251 Hanks Electrical Supplies 27.73 Electrical Parts&Supplies
78252 Harold Primrose Ice 80.00 Ice For Samples
78253 Harrington Industrial Plastics,Inc. 1,831.99 Plumbing Supplies
78254 Hit Brothers 19,975.30 Chemicals-Odor&Corrosion Control-Newport Tmnkline
78255 Hill,Inc. 3,299.62 Mechanical Pads&Supplies
78256 Home Depot 644.12 Misa Repair&Maintenance Material
78257 loon International,Inc. 2.523.31 Lab Pads&Supplies
78258 IDEXX 4,019.08 Lab Paris&Supplies
78259 IECOC 30.00 Training Registration
78260 Industrial Distribution Group 5,018.99 Tools,Locks,Print&Mechanical Supplies
78261 Industrial Metal Supply T7.36 Metal
78262 Indusrial Power Technologies 113.07 Mechanical Pads&Supplies
78263 Inorganic Ventures,Inc. 192.80 Lab Pads&Supplies
78264 International Electrical Testing Assoc. 2.724.20 Training Registration
78265 Iran Mountain 100.00 Bid Document Storage Fees P7-37
78266 barman Paris&Services 19524 Mechanical Pads&Supplies
78267 Jakes Collision 2,059.78 Vehicle Repairs&Painting Services-V451
78268 JJ Keiser&Associates 746.00 Publication
78269 Johnstone Supply 305.95 Valve
78270 J2 Printing Services 849.07 Priming-Form
78271 Kua Textiles,Inc. 6.925.22 Reconciliation User Fee Refund Program
H:WemArfFXMLEeYaIlM ffl 1LIaaw PNE RepwMa911CWmf Pro RGpan-0"I1 EXHIBIT,B -.
ravzlnx� Page 4 of 7 mar2000
Claims Paid From 0111MG to 011311011
Warrant No, Vendor Amount Description
78272 Kleinfelder,Inn 123.00 Soils,Concrete&Other Materials Testing
79273 LA CAD Corporation 275.00 Training Registration
78274 La"ers Tide Company 350.00 Tolle Searches-OCSO Trunk Sam.
78275 League of California Cities 1,687.50 General Management Division Meeting Registration
78278 Lieber)Cassidy 6,355.00 Professional Service-Human Resources
78277 LINJER 10,717.03 Professional Service-DART MO 9.22-99
78278 Lerman Education Services 638.00 Training Registration
78279 Doyle Moberly 1.163.85 User Fee Refund Regarding Septic Tanks
78280 Managed Health Network 1,057.76 Employees Assistance Program
78281 McJunkin Corporation 258.01 Valve
78282 McMaster Can Supply Co. 2,081.25 Electrical,Mechanical&Lab Paris&Supplies
78283 Medlin Controls Go. 4,388.70 Instrument Supplies
78284 Mesa Consolidated Water Dist. 15.19 Water Use
78285 Moreland&Associates 2.070.00 Auditing Services-Special Project J-35-2
78286 Motor Cargo 144.43 Freight Charges
78287 Municipal Information Systems 240.00 Membership
78288 National Filler Media Corporation 13,942.50 Filter Press Bells
78289 National Plant Services,Inc. 13.735.40 Vacuum Truck Services
78290 Neal Supply Co. 850.55 Plumbing Supplies
78291 Maya&Moore Corporate Accounting 16,045.D0 Prot Services-Materials Testinglinsp.&Geoledmical Engrg.-P1437 8 P2.66-2
78292 The Norm Companies 335.72 Mail Delivery Service
78283 NWRI National Water Research Institute 425.00 Environmental Compliance Services Div.Meeting Registration
78294 OC Tanner Recognition Company 96.07 Employee Service Avauds Program
78295 OCB Reprographics 188.47 Printing Service-MO 1@BI00
78296 Office Depot Business Services Div. 1,095.68 Office Supplies
78297 OMI Industries 3,880.00 Instrument Paps&Supplies
78298 OneSourm Distributors,Inc. 1,365.79 Electrical Paris&Supplies
78299 OPTIO Software,Inc. 6,389.87 Soflweds Maintenance Agreement
78300 Oracle University 697.56 Training Registration
78301 Orange Fluid System Technologies,Inc. 423.93 Plumbing Parts&Supplies
78302 Once Construction Supply 198.59 Marking Pain]
75303 Oxygen Service Camp" 134.90 Specialty Gases
78304 Pacific High Reach.Inc. 12,261.91 Aerial Lift Rental
78305 Pacific Mechanical Supply 1,277.67 Plumbing Pads&Supplies
78306 Pacific Publishers 10.98 Publication
78307 Paragon Plastics Company 248.90 Plexigiass
78308 Parker Supply Company 4,989.00 Repairs&Mamlenance Service-Shop Floor Primer/Coating
78309 PCG Industries 1.950.00 Regains&Maintenance Service-Pump Shaft
78310 PerkinEbner LAS 126.63 Lab Pens&Supplies
78311 PetSolullons 64.49 Lab Pads&Supplies
78312 PFE International.Inc. 1.205.20 Equipment Service Agreement
78313 PFT/Alexander Service.Inc. 161.63 Freight Charges
78314 PL Ham Company,Inc. 1,027.27 AB Fibers
78315 Polydyne,Inc. 24,060.01 Calionic Polymer MO 3.1"2
78316 Penton Industries,Inc. 568.88 Instrument Pads&Supplies
78317 Pon Supply 48.13 Electrical Pads for Fluorescent Light-Nerissa Ocean Monitoring Vessel
M18 Primary Source Office Furnishings,Inc. 941.74 Office Furniture
78319 Praienllal Overall Supply 2,622.14 Uniforms&Related Asides
78320 PS TEK,L.L.C. 222.35 Mechanical Pads&Supplies
7=1 Reinin Instrument,L.L.C. 602.37 Lab Pads&Supplies
78322 Voided Check - -
H:VIepMNE%CElaND31MPa11ME1Clehra Peal Repod'WanWimm PaN Resod-OIJIa9 EXHIBIT B
oonlatc Page 5 of 7 ylv20re
Claims Paid From 01116106 to 01/31/06
Warrant No. Vendor Amount Description
78323 Red Wig Shoes 147.40 Safety Shoes
78324 RF MacDonald Co. 612.21 Electrical Pads&Supplies
78325 Rockhursl College Continuing Education 780.00 Project Management Offer&Eng.&Const.Mgml.Divisions Meeting Regisration
78326 Role*Controls,Inc. 16.087.88 Materiels,Supplies&Installation P1-82
78327 Royale Cleaners 12.00 Dry Cleaning Services
78328 RSA Suffer Soil Products 1.575.84 Soil Materiels
78329 Rebekah Schneider 1.163.85 Usar Fee Refund Regarding Septic Tanks
78330 Catherine Senomns 522.50 Reconciliation User Fee Refund Program
78331 SARBS-CWEA 55.00 Training Registration
78332 SAWPA 15,000.00 Santa Ana River Fish Conservation Annual Funding
76333 SBC 737.20 Telephone Services
78334 Sec Long Distance 1,178.42 Long Distance Telephone Services
78335 SBCIMCI 2,857.89 Telephone Services
78335 Schwirg America,Inc. 2.502.76 Pump Parts&Supplies
78337 City of Seel Beach Finance Dept. 111.88 Water Use
78335 Seavisual Consulting,Inc. 4,302.00 Professional Services-Ocean Oulfall Current Meter Services
78339 Sewer Equipment Company of America 198.11 Hose Guides
78340 Shamrock Supply Co.,Inc. 2,557.64 Concrete Mix&Mechanical Pads
78341 Shunduck Sales&Engineering 3,382.16 Mechanical Pads&Supplies
78342 Smith Emery Company 456.00 Soils,Concrete&Other Materials Telling
78343 Smith Pipe&Supply.Inc. 617.09 Landscape litigation Supplies
78344 Southwest Concrete 419.34 Concrete
78345 Spec Services,Ina 16,347.11 Engineering Services J-33-1
78346 Spex Cerllprep,Inc. 329.83 Lab Paris&Supplies
78347 Stanley Steamer Inlema0onal,Inc. 636.50 Carpet Cleaning Services
78348 Stratus Environmental,Inc. 4,455.00 Professional Services-Groundwater Monitoring
78349 Summit Steel 6.630.18 Metal
78350 Sunset Industrial Pads e24.47 Mechanical Pads&Supplies
78351 T&D Communications 1,255.85 Conduction P2-66-2
78352 Teledyne Anslyllcal 06.02 Instrument Pads It Supplies
78353 TerminkX lntematlenel 1.035.00 Pest Control
78354 The JG Press,Inc. 75.00 Books&Publications
713355 The Pittsburgh Conference 520.00 Training Registration
78356 The Standard Insurance Company 4.731.25 Executive Disability Insurance
78357 The Walking Man,Inc 1.075.00 Public Notice Printing&Meiling Services 7-36&741
78358 Thomas V.Bellinger 2,000.00 Lob Analyses
78359 Thompson Industrial Supply,Inc. 1,224.30 Mechanical Pads&Supplies
78380 TMV Systems Engineering,Inc. 41,081 Software Maintenance
78361 Tanya Lock&Safe Service&Sales 4.418.78 Computer Hamware/6a6Ware
76382 Townsend Public Affairs 5,000.00 Legislative&Executive Advocale for Grant Funding
78353 TREMCO Incorporated 780.00 Professional Services-Roof Evaluations at Pit.2
78364 Truck&Auto Supply,Inc. 91.82 Automotive Supplies
75365 Tuff Skin 435.00 Truck Repairs-Line-X Utility Bed of V451
78366 US Filter C.T. 766.75 Service Agreement-DI Water Systems at Plants 1 &2
78367 Ullro Scientific 184.38 Lab Parts&Supplies
7836E Underground Electric Supply 2,796.67 Electrical Pals&Supplies
78369 United Parcel Service 80.32 Fenced Services
78370 United Pumping Service 3,868.38 Pumping Service
78371 Unionist Silencer 1,360.55 Air FMlem
78372 US Equipment Co.,Ina 1,499.13 Oil Coolant
78373 Vapex,Inc. 3,195.00 Instrument Paris&Supplies
H Wepfln1EXCELaWWGAPSHARMC1eime Paid RapvMeonClei,m Pelf Repair-111-31-06 EXHIBIT 9
finRtma Pa0e 6 of 7 vmnaos
Claims Paid From 01116/06 to 01131106 '
Warrant No. Vendor Amount Description
78374 Varian Associates,Inc 2,537.96 Lab Parts&Supplies
78375 Vision Service Plan CA 9.957.96 Vision Service Premium
78376 Vortex Corp. 6,451.60 Door Repairs-Various Locations
75377 VWR Scientific Products Corporation 4,447.63 Lab Paris&Supplies
78378 The Wackenhut Corporation 10,119.56 Security Guards
78378 Waxie Sanitary Supply 1,329.74 Janitorial Supplies
78380 WEF 470.00 Membership-Water Environment Federation
78381 WEFTEC 990.00 Training Registration
78382 West Lila Supply Company,Inc. 552.04 Electrical Pats&Supplies
78383 Wiliam M.Nugent&Co.,Inc. 59.75 Mechanical Pads&Supplies
78384 Xerox Corporation 17,079.84 Fa dCopier Leases,Managed Services&Supplies
78385 Yale/Chase Materials Handling,Inc. 2.118.75 Automotive Pads&Supplies
78386 Yokagawa Corp.of Americe 320.51 Instrument Supplies
78387 Marrow Meadows Cory, 14,519.00 Construction FE03-24
78308 Union Bank of California 23,745.00 Construction 7.36&741
78389 Steve Anderson 97.97 Meelimi/fmlMrg Expense Reimbursement
78390 Richard Green 26.84 Meeling/Tralnirg Expense Reimbursement
7a391 Chuck Hodge 36.00 Meeting7freining Expense Reimbursement
78392 Hardal S.Khublell 125.00 MeefiigRreining Expense Reimbursement
78393 Subash Mysore 182.03 MeelingRralnirg Expense Reimbursement
78394 Ellen Rey 570.20 MeelirglTralMng Expense Reimbursement
78395 Rita Riccardo 130.00 Maefinglfmhing Expense Reimbursement
78396 Warren L.Stemin 90.00 Meefing/ireining Expense Reimbursement
78397 South Coast Air Duality Mgml.Dist. 12,824.39 Permit Processing Fee P2-90
78398 Efren Lucena and COSTCO 3,000.00 Employee Computer Loan Program
78399 South Coact Air Duality Mgmt.Dial. 9.459.62 SCAOMD Perna ModiBcetion Pl-102
78400 Enchanter,Inc. 7.600.00 Ocean Monitoring&Ouffel Inspection&Maintenance
78401 RMS Engineering&Design,Inc. 5,630.00 Engineering Services-ShuWral Drawings
76402 County of Orange Auditor Controller 135.00 Administrative Fees-Adjusin ms to Property Tax Bills
Total Accounts Payable-Warrants 6 6,870,105.71
Peadoll Disbursements
32470 - 32561 Employee Paychecks S 162.462.15 Biweekly Payroll 01/18/06
32563 - 32573 Employee Paychecks 21,998.25 Retirements,Reim,Terminalion,PR Adjustmerts&Voids/Reissues'
121188 - 121741 Direct Deposit Statements 1,137,OB1.48 Direct Deposit Statements 01/18/06
Total Payroll Disbursements $ 1,321,541.88
rn.v,vo.vsea w onus m a ax.an v+am.
Wire Transfer Payments
OCSD Payroll Taxes&ConMbulions $ 807,403.38 Biweekly Payroll 01/18106
US Bank $ 2,3a1,425.12 Sedes 1990-92 Advance Refunding COPs Principal&Interest Payment 1131/06
US Bank 115,987.97 Series 2000 A&B Refunding COPs January Interest Payment
Union Bank of California 6,676,946.57 Series 2003A,COPS January Inleresl Payment
Total Wire Transfer Payments $ 9,981,763.04
Total Claim.Paid 01116106-01131MG $ 18,182,410.63
Ill:wepnenK.CEtnmumwPSRAREV i—Pa.e Raromesonclai—Pets Repo.-.1ar.ae EXHIBIT
a n,'. Page 7 of 7 ytp2ppe
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Notice and Agenda for the Regular Board Meeting of Orange County Sanitation
District to be held on March 22, 2006, was duly posted for public inspection in the main
lobby of the Districts' offices on March 15, 2006.
IN WITNESS WHEREOF, I have hereunto set my hand this 15th day of March,
2006.
LiliaLilia o(�tant Secretary
Board of Directors
Orange County Santation District
H VEPTHRTUBLIC AFFAIRS32MB31FORMSAGENDA CERTIFICATIONDOC
UNUSED
MEDICATIONS
SHOULD BE
O
Taken to a household
hazardous waste collection
s center or event(no controlled
substances allowed)or
Put in a sturdy,securely
sealed container,then in a
trash con where children and
animals can't reach them.
r
"a..el o.«dou waccdem°1 california
roiwne^e.Coll town Cern.,m pharmacists
I.e00.222 1222 M. association
24 M./day �.—Rip
NO TIRE MEDICAMENTOS
go
EN EL DESAGUE
r � .
Todo medimmento recetado o no recetado
qua sea desechado en el desogde,lavaho a
excusado, contomino el media ambiente.
Tome sus medicamemas Como recetados
par so donor, y favor de deshacerse
de medicamentos no utilizados de In
manes apropioda.
.ldeu;al,Rouse ul conga de
• • achamacists
ORANGE COUNTY SANITATION DISTRICT
March 15, 2006
gAerp:
mm s9z-2911 To the Chair and Members
m:
n19r 962d356 of the Board of Directors
•wr.a»9.tem
eng
Subject: Board Letter
R Pam
P.e Baria12712T
Fglnttin Valley.G
92729-81 2T
.v..t a&l ..: The following are items that you may find interesting. If you need additional
103G9 Ellie Auenae information on any of the items, please call me.
Fnurtain valley.ca
92708-7018
All.row, Announcing the Public Information Manager
Hyena„
Hyena„ Bret Colson, our new Public Information Manager, started working in this important
• position for the Orange County Sanitation District this week.
Miami
Prior to coming to work for OCSD, Bret was a public relations consultant and the
Anaheim public information manager for the City of Anaheim where he worked on several high
Brae
Buena Park profile projects, including construction of the Arrowhead Pond and the renovation of
cypress Anaheim Stadium. He also was part of the team responsible for the makeover of the
F°°nr Fin ✓,been Anaheim Resort, including widening of the I-5 Freeway through north Orange Count
F°Ilarlf, 9 9 Y 9 9 Y.
ce.ren Oroid, expansion of the Anaheim Convention Center, construction of The Disneyland Resort
Hununeton ee.ahIr.ne and a series of public and private improvements surrounding the entire area.
Le Habra
L.deem. While in Anaheim, Bret also served as the primary media relations liaison for the city,
Lee Alamitos
rvewPort B..eh working with local, regional, and national print and electronic media on a daily basis.
o'anea He also developed in-house media for Anaheim, managing and overseeing content
Se.an
A. and development of the city's award-winning Web site, www.anaheim.net, for six
seal eeaah years. He played a key role in building traffic on the site to more than two million hits
s bn.
.d per month. In addition, Bret was managing editor and the primary writer for 10 years
u do
Lille Park for Anaheim Magazine, a quarterly publication promoting city programs and services
rorba Linda distributed to all residences in the city.
County of Orange
s.nlury Ol.trict. First Milestone to Secondary Met
The Orange County Sanitation District celebrated a significant milestone when it
1iO.M. dedicated its new secondary treatment facility.
Midway City
wits Cl.tri.ta In July 2002, the Board of Directors made a landmark decision when it voted to move
Irude Ranch all operations to secondary treatment standards. The board's action marked the first
time in California that a local wastewater treatment agency voluntarily elected to give
up its waiver of the Clean Water Act requirements.
We celebrated the successful completion of the first of seven milestones that will be
met by December 31, 2012. There was a ribbon-cutting ceremony at the newly-
constructed trickling filters at Plant 1.
The event was held today, Wednesday, March 15, 2006 at 10 AM.
To ma,dann woHid-ties leadership.waate..ar and at,rasmrce management.
Board of Directors
Page 2
March 15, 2006
No Drugs Down the Drain
The Sanitation District teamed up with the Los Angeles County Sanitation Districts
and the City of Los Angeles in partnership with the California Pharmacists
Association and the California Poison Control System in a joint effort to launch a new
public education campaign to reduce the improper disposal of pharmaceuticals.
The campaign's tagline "No Drugs Down the Drain," is meant to encourage Southern
California residents to dispose of their unused or expired medicine in ways other than
Flushing them down the toilet.
The pharmaceutical outreach campaign will be launched on March 19, 2006 to
coincide with the National Poison Prevention Week. The campaign consists of an
informational Web site and drop-in cards to be distributed directly to the public when
they fill their prescriptions at their local pharmacy. Sanitation District staff distributed
2,000 drop-in cards to each of the approximately 450 local pharmacies, providing
instructions on how to properly dispose of unused or expired medicine. The Web site
provides in-depth information about the program and its importance.
In the past, the public was advised to flush unwanted medicines down the toilet as a
poison prevention measure. Recent studies indicate that the pharmaceuticals found
in wastewater may have an adverse effect on the environment. Sewage treatment
facilities are not designed to remove or destroy the chemicals found in
pharmaceuticals,which consequently end up in surface water. This has become
even more important, as the Sanitation District's effluent is the source water for the
Ground Water Replenishment System.
There are several options available to dispose of unwanted medicines. A highly
recommended alternative is to take unwanted over-the-counter and prescription
medications to a Household Hazardous Waste Collection Center or event. Another
option is to put the crushed remains in a sturdy and securely sealed container and
place in a trashcan, out of the reach of children and pets.
Local residents can help keep our water safe and our ocean clean by taking their
medicine as prescribed,and disposing of unused portions property.
For more information on the public education campaign or the Household Hazardous
Waste Collection Center,visit htip://nodrugsdownthedrain.org and
http://oclandfills.com
Bushard Protect Update
The Bushard Trunk Sewer Replacement Project will resume construction later this
month. Work will begin at Bushard Street and Panacea Drive in Huntington Beach
and proceed north to Ellis Avenue in Fountain Valley. In addition, work at the
intersection of Bushard Street and Ellis Avenue is scheduled to begin in April 2006.
A full closure of the intersection will be required for nine consecutive months. The
Sanitation District has worked closely with the Cities of Huntington Beach and
Fountain Valley to secure the permits for the construction work.
Board of Directors
Page 3
March 15, 2006
The Public Information Office distributed letters and fact sheets to over 13,000
residents and businesses in the project area. Three community meetings were
scheduled for March 8, 9, and 16 with residents from Huntington Beach and Fountain
Valley to provide project information, answer questions and address their concerns.
Letters were also distributed to 16 schools in the area offering briefings on the
project, and bulletins to ensure the safety of the children.
FOG Inspection Program Picking Up Speedl
The Fats, Oils, and Grease (FOG) inspection program is moving forward through an
agreement with the Orange County Health Care Agency(OCHCA). OCHCA
inspectors will be undertaking food service establishment inspections in the
jurisdictions of agencies who sign up for the inspection program. So far, 13 agencies
have either signed the agreement to participate or provided notification of their intent
to participate. The Sanitation District is administering the program, serving as the
program coordinator for the participating agencies and the county. We will be
reimbursed for our costs to administer the program.
Under the program, OCHCA inspectors will annually inspect food service
establishments to determine their success in implementing eight Kitchen Best
Management Practices for the control of FOG discharges into the sewer. FOG is a
major contributor to sewer blockages that lead to sewage spills. Inspection results
will be reported to each agency for follow up enforcement, if necessary. Each agency
will pay for its share of the cost of the program based on the number of food service
establishments inspected and the amount of time spent for each inspection.
The first inspections are scheduled to begin around March 2006. Participating cities
include Anaheim, Buena Park, Costa Mesa Sanitary District, Fountain Valley, La
Habra, Midway City Sanitary District, City of Orange, Santa Ana, Stanton, Sunset
Beach Sanitary District, Villa Park, City of Yorba Linda, and Yorba Linda Water
District.
OCSD Bids Farewell to Retirees
This March, the Sanitation District will be losing close to 400 years of knowledge and
experience when 17 of our employees retire. Staff from various departments,
including engineering, regional assets, operations, finance, human resources and
technical services will be saying goad-bye. We are saddened to see so many
talented individuals leaving, but their legacy will always remain. W hen asked about
their plans for the future, most expressed their desire to spend more time with family
and friends, and doing other things like fishing, traveling and taking on new projects.
I would like to join staff in wishing them all the best in their future endeavors as they
embark on a new chapter in their lives. A reception will be held in their honor on
March 23 in the boardroom.
Board of Directors
Page 4
March 15, 2006
Articles of Interest
I have also included several additional published articles that you might find
interesting.
If you would like additional information on any of the above items, please call me.
Jame
Interim General Manager
JDR:gg
R:➢rJMOMIMGMPA LET�315 WO DLTR.000
Attachments
j SANIT
oJN� AT Loy c h R firees. ..,
2 y
I 1
o i
FdTVN0 THE ENV`P�@
Congratulations!
This March, OCSD will be losing over 175 years Bill Aldridge. Principal Accountant
of experience when several of our employees retire. 25 Years of Service. Started 05/05/80
OCSD bids a farewell to our retirees and wishes them Div. 220-Accounting
the best of luck in their future endeavors. 25 years of service is easily
said. but not easily achieved.
Bill is ready to leave the
Frances Morrison. Source Control Inspector II numbers behind and focus
29 Years of Service, Started 09/26/77 on everything else he hasn't
Div 640-Source Control had time to do, such as play
The first female operator and more golf and fix the house
inspector—the one who he recently bought. Even
paved the road for other though he plans to spend his
women to perform field time on new things, he will be
jobs—is retiring. Fran is ready watching the agency with much
to take on other projects that interest and wishing everyone
have been on hold due to much success. "I want to take this opportunity to thank
lack of time. She will be everybody for helping make my stay here a memorable
preparing to attend her high one," stated Bill. 'And I want to encourage my successor
school reunion and planning to strive to be a team player and take the time to get
her rafting trip down the more involved with OCSD activities. something I wish
Colorado River. As excited I would have done."
as Fran is about her plans,
she will still miss her fellow inspectors,whose Jeff Esber, Principal Financial Analyst
knowledge, competence and support she could always 24 Years of Service, Started 08/02/82
count on.She will miss knowing that she's part of a Div 410-Regiona/Assets&
group of dedicated people doing an important job. Services Admin.
"THANKS." that's what Jeff
Denise Bell, Principal Laboratory Analyst would like to tell OCSD staff,
26 Years of Service, Started 0724/79 "thanks for all the great
Div. 630-Environmental Sciences Laboratory memories." Now that he will
After 26 years of dedicated have all the time in the world,
service, Denise is saying he will do anything he wants:
farewell to her OCSD family. travel, play more golf and
She has decided to spend her even build a model railroad
retirement in the health and in his back yard. He believes
fitness industry. fulfilling her that as employees,we do not
desire to assist people with leave a legacy,we simply try to make things better
medical recovery needs. for the organization, for the public, and the next
After a short sabbatical in generation of successors"I would like my successor
Costa Rica. she will begin her to know that he has the best job at OCSD and is
classes at Western Institute of working with a great group of people... the only thing
Neuromuscular Therapy preparing to embark on her better is retirement,"Jeff said.
newfound career.
There are others who have not made up their minds about retiring or have chosen not to participate
in this handout. In respect to them, their names, stories and faces don't appear here. We wish all the
retirees the best!
Judy Bucher, Human Resources Analyst Barbara Arentz,Administrative Assistant
23 Years of Service. Started 10/31/B3 17 Years of Service, Started 12/11/89
Div. 540- Worktiame Support Services Diu 760-Engineering 8 Construction Mgmt.
Judy will never forget the day The day is almost here,
she started at OCSD, it was when Barbara will have to
Halloween and everybody say goodbye to her friends
was dressed up in costumes and co-workers as she
having a ball. "It was weird prepares to begin a new
to meet my co-workers in chapter in her life. "I haven't
costume,'Judy said. But really thought about what
she soon realized she was I'm going to do with my
in very good company, time,' Barbara said. She
company she will miss dearly might join a club,take a
when she leaves. Judy plans class or even learn Spanish.
to contribute to the community, All she knows is that she is
mentor the youth, travel, spend time with family ready for retirement. She will certainly miss
and take the time to cook those meals that take coming to work and spending the day with the
hours to make. She's even planning a cooking tour friends she has made here. She hopes to be
of Italy. She would like her successor to know just remembered for her willingness to help and the
how fortunate they are to be affiliated with an effort she put into her work.
excellent, award-winning organization.
Donna Simmons,Accounting Assistant II
Bob Michna, Operations Supervisor 16 Years of Service, Started 08/20/90
20 Years of Service, Started 01/27/86 Div 220-Accounting
Div. 840-Operations Plant 2 Donna's retirement is just
The time has come for Bob around the corner and
to begin a new and exciting she can't wait to enjoy all
journey. After many years of the beautiful things in life.
service, he is calling it a day She is mostly looking
and will be spending his free forward to bringing serenity
time driving across America, and happiness into her life.
and maybe stopping along She plans on spending time
the way to do some fishing, with family, friends, pets,
Bob doesn't want to make any hobbies,and all the
plans, he just wants to enjoy wonderful things nature has
each day as it comes. to offer, "The agency and people are inspiring,
extraordinary and awesome," Donna said. She will
miss the close friendships she has built, the smiles,
stories, holiday festivities, and the open door policy
her boss of 15+ years offered.
777is list was put together in coordination with those that have announced
their retirement with Human Resources as of March 2,2006.
NO DRUGS
DOWN THE DRAIN
.r.
UNUSED
404 MEDICATIONS
SHOULD BE
0
Taken to a household
hazardous waste collection
center or event (no controlled
substances allowed) or
Put in a sturdy, securely
sealed container, then in a
Unused prescription and • - , trash can where children and
the-counter " • animals can't reach them.
are put in drains - .
down the toiletpollute
environment, so please take
as prescribed and dispose of
unused portions prope
case o overdose i s accidental ocalifornia
poisoning,
isoning,, call the poison center at Pharmacists
1-800-222-1222 CALIFORNIA association
24 hours/day '''sr's ¢in
V Sa Nli.,ip
New Trickling Filter Facility
at Orange County Sanitation District Reclamation Plant No. 1
fe NS iMF fHV\aa
What Are Trickling Filters?Trickling filters are a secondary treatment process that use organisms140
grown on rocks or plastic media to eat dissolved biodegradable organicslat4ia� i'•�•""
(fats, sugars and proteins), converting them into settleable sludge.
This process of decomposing waste is the same as what occurs naturally e,,,e,exxn Eiden
in a stream. We just optimize the process so that what takes days
in nature only takes minutes in our treatment system.
The two new modern filters will be 3-story cylindrical structures.
The new filters will replace the four old smaller filters optimizing *n�
,la.v,cxupsmlar
the land use to also include two new clarifier settling basins; m,rleen viol,ents so�oowrr�°m e'a
After filled as deep Ih.,h me phods.
adding capacity and improving treatment efficiency. The new filters ma eider noes into a pander to Same our me opted wpsleeamrvM be least m,
will use a plastic media instead of rock, providing more surface me heaev Bond pamaied,dwageL on Gmmedwd..rip,amed dea spree
a,deadhead acme ma rereesed rhmolr,me
area for the beneficial organisms to grow. media dean p,l
•nevsledded area
i,harden,waxly r„
New Trickling Filter Facility Construction Facts y
• Two trickling filters, 166-ft in diameter and 30-ft high to fact �ddapmre,
• Two circular clarifiers 175-ft in diameter and 14 to 20-ft deep Oi�pla ec deaaeer Speed of rer
p
• Each circular clarifier holds approximately 3 million gallons of water ,,,B1813, iaa mzoreel aeon
canwk6 Nmp
• Circular clarifier detention time of more than 4 hours font l•m 'B1""
GWR Syclem
• Structures supported by 1,092 precast concrete pilings weighing 6 tons each Of OLP0a pipBll.
(if laid end-to-end would span 12 miles) u""'p'p""' new darlfler
babin semen dolled,
• Excavated dirt would fill a football field 11-ft high hedger sent
• Each trickling filter contains 12 million square feet of media surface area an civil
(enough to cover Plant No. 1 three times)
• Pump station capable of pumping 75 million gallons of water per day, Co,ntrran„pes a nnwnomm epee
enough to fill up 500 two-thousand square foot homes every day ,Me me woum m'to dilepa
archadliese,al of the
• $33 million construction contract an°e0fB5
Construction started in June 2003 and the facility began
operation in February 2006, meeting our consent decree
milestone date of March 15, 2006. Wong set
Rev.a06
2006-07 COMMITTEE/BOARD CALENDAR
JULY '06 AUGUST '06 SEPTEMBER '06
S M T W T F S S M T W T F S S M T W T F S
1 1 2 3 4 5 1 2
2 3 6 7 8 617 8 9 10 11 12 3 5 7 8 9
9 10 13 14 15 13 14 15 16 17 18 19 10 11 14 15 16
16 17 18 20 21 22 20 21 22 24 25 26 17 18 19 21 22 23
23 24 25 26 27 28 29 27 28 29 30 31 24 25 26 28 29 30
30 31
OCTOBER '06 NOVEMBER '06 DECEMBER '06
S M T W T F S S M T W T F S S M T W T F S
1 2 _1]111 5 6 7 2 3 4 1 2
8 9 10 11 12 13 14 5 6 7 9 11 3 4 5 7 8 9
15 16 17 18 19 20 21 12 13 14 16 17 18 10 11 14 15 16
22 23 24 26 27 28 19 20 21 22 25 17 18 19 r 21 22 23
29 30 31 26 27 28 29 30 24 2] 28 29 30
31
JANUARY '07 FEBRUARY '07 MARCH '07
S M T W T F S J252
T W T F S S M T W T F S
2 3 4 5 6 1 2 3 1 2 3
78 10 11 12 13 6 8 9 10 4 5 6 8 9 10
14 15 16 17 18 19 20 1. 15 16 17 11 12 15 16 17
21 22 23 25 26 27 20 21 22 23 24 18 19 20 21 22 23 24
28 29 30 31 27 25 26 27 29 30 31
APRI L '07 MAY '07 JUNE '07
S M T I W T F S S I M T W T F S S M T W T F S
1 2 3 5 6 7 1 3 4 5 1 2
8 9 10 19 12 13 14 6 7 8 10 11 12 3 45 7 8 9
15 16 17 18 19 20 21 13 14 15 16 17 18 19 10 11 A151622 23 24 26 27 28 20 21 22 24 25 26 17 18 19 20 29 3027 29 30 31 24 25 26
Board(Blue) ,OMTS(Red) PDC(Yellow) ,FAHR(Green) 0 Legislative Affairs I OCSD Holidays 0 CIP
i AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
108" ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
March 22, 2006 — 7:00 P.M.
1. Invocation and Pledge of Allegiance
2. Roll Call
3. Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, d any.
4. Appointment of Chair pro tem, H necessary
5. Public Comments
6. The Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors.
a. Report of Chair; consideration of Resolutions or recommendations, presentations
and awards
b. Report of General Manager
C. Report of General Counsel
7. If no corrections or amendments are made, the minutes for the regular meeting held on
February 22, 2006, will be deemed approved as mailed and be so ordered by the Chair.
8. Ratifying payment of claims of the District, by roll call vole, as follows:
ALL DISTRICTS 02/15/06 02/28/06
Totals $32,019,576.86 $12,246,166.17
03/22/06
Page 2
CONSENT CALENDAR
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. (1) Receive and file petition from Hearthside Homes requesting annexation of
71.24 acres to Orange County Sanitation District in the vicinity of Bolsa Chica
Street and Los Patos Avenue, in an unincorporated area of Orange County; and,
(2)Adopt Resolution No. OCSD 06-04, authorizing initiation of proceedings to
annex said territory to OCSD (Proposed Annexation No. OCSD-55—Bolsa Chica
Annexation).
b. Approve Utility Agreement No. 12-UT-935 with the State of California,
Department of Transportation (Caltrans)to reimburse the Sanitation District for
relocation design and inspection costs associated with the relocation of an
existing 12-inch VCP sewer at the intersection of Orangethorpe Avenue and
Imperial Highway within the city of Yorba Linda for an amount not to exceed
$85,000.
END OF CONSENT CALENDAR
10. Consideration of items deleted from Consent Calendar, if any.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE
Consent Calendar
a. Order draft Steering Committee Minutes for the meeting held on January 25,
2006, to be filed.
b. (1)Authorize the Interim General Manager to pursue and select real property,
within budgeted funds, on behalf of the District for possible purchase:
(2) Authorize the Interim General Manager and Board Chair to negotiate a
Purchase and Sale Agreement to acquire the selected property for a purchase
price not to exceed $10,500,000, contingent upon final approval of the Board of
Directors, in a form acceptable to General Counsel: and,
(3)Approve the use of the acquired property for the North County Yard.
Non-Consent Calendar
C. Review and consideration of agenda items considered by the Steering
Committee re the March 22, 2006 meeting.
d. Consideration of items deleted from Steering Committee Consent Calendar, if
any.
03/22/06
Page 3
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
OMTS Consent Calendar
a. Order draft Operations, Maintenance and Technical Services Committee Minutes
for the meeting held on March 1, 2006 to be filed.
b. (1) Receive and file Summary Report re Investigation of Discharge Permit
Violation for Dioxin, Phase I, dated March 1, 2006; and,
(2)Approve increase in expenditure for Columbia Analytical Laboratories for
dioxin testing by$50,000 to bring the total purchase order for FY 05/06 to
$80,000.
Non-Consent Calendar
C. Consideration of items deleted from OMTS Consent Calendar, if any.
13. PLANNING DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. Order draft Planning, Design and Construction Committee Minutes for the regular
meeting held on March 2, 2006, to be filed.
b. Approve a Professional Services Agreement with Earth Tech, providing for
engineering services for Rehabilitation of Magnolia Trunk Sewer, Contract
No. 3-58, for an amount not to exceed $699,096.
C. Approve a Professional Services Agreement with Carollo Engineers for studies
and a preliminary design report for Headworks Rehabilitation/Refurbishment at
Plant No. 1, Job No. P1-71, for an amount not to exceed $339,738.
d. Approve a Professional Services Agreement with Camp, Dresser& McKee, Inc.
for engineering services including Design-Build bid document preparation for
Cable Tray Improvements at Plant Nos. 1 and 2, Job No. J-47, for an amount not
to exceed $2,251,548.
e. Approve Amendment No. 1 to the Professional Services Agreement with Malcolm
Pirnie, Inc. providing for construction support services for the Bushard Trunk
Sewer Rehabilitation, Job No. 1-24, for an additional amount of$137,937,
increasing the total amount not to exceed $223,045.
f. Approve Amendment No. 1 to the Professional Services Agreement with Brown
and Caldwell for engineering services for Plant No. 2 Primary Sludge Feed
System Project, Job No. P2-91, providing for additional engineering services for
an additional amount of$212,816, and an additional $100,000 for General
Manager task order approvals, increasing the total amount not to exceed
$2,990,366.
03/22/06
Page 4
g. Approve Amendment No. 4 to the Professional Services Agreement with Camp,
Dresser, & McKee for Rehabilitation of Odor Control Facilities, Job No. J-71-8,
providing for additional engineering services, for an additional amount of
$327,172, increasing the total amount not to exceed $4,918,704.
h. Approve Amendment No. 6 to a Professional Services Agreement with Lee& Ro,
Inc., providing for additional engineering and construction support services for
Replacement of the Bitter Point Pump Station, Contract No. 5-49; Replacement
of the Rocky Point Pump Station, Contract No. 5-50; Rehabilitation of the 10
Street Pump Station, Contract No. 5-51; and Rehabilitation of the"A" Street
Pump Station, Contract No. 5-52, for an additional amount of$328,566,
increasing the total amount not to exceed $4,809,382.
i. Approve a Cooperative Agreement with the City of Huntington Beach for
remaining work to be completed on the Bushard Trunk Sewer Rehabilitation, Job
No. I-2-4.
j. Approve a Reimbursement Agreement with Orange County Water District for
Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4.
k. (1)Approve a Sole Source Agreement with Southern California Edison for
engineering services, fees, materials, and labor for 66kV Substation at Plant No.
1, Job No. 131-97, for an amount not to exceed $6,052,000; and,
(2) Increase the project budget in the amount of$4,302,947 for a total amount of
$9,475,538.
I. Reject all bids submitted for Tenant Improvement for Engineering/Construction
Trailer Complex 'C', Job No. FE04-36.
Non-Consent Calendar
M. Consideration of items deleted from PDC Consent Calendar, if any.
14. FINANCE ADMINISTRATION AND HUMAN RESOURCES COMMITTEE
FAHR Consent Calendar
a. Order draft Finance,Administration and Human Resources Committee Minutes
for the meeting held on March 1, 2006, to be filed.
b. Approve SAFETY-POL-101, 102, 107, 202, and 402, and 405 as provided for in
Resolution No. OCSD 02-5, regarding the District's Injury and Illness Prevention
Program Policy.
FAHR Non-Consent Calendar
C. Consideration of items deleted from FAHR Consent Calendar, if any.
03/22/06
Page 5
15. LEGISLATIVE AFFAIRS COMMITTEE
The meeting scheduled for March 14, 2006 was cancelled.
NON-CONSENT CALENDAR
16. Approve renewal of Purchase Order No. 101758-OB for Purchase of Cationic Polymer,
Specification No. C-2003-143, issued to Polydyne Inc., with a unit rate increase of$0.70
per active pound for Solution Polymer increasing the total price to $1.75 per active
pound plus tax, and a unit rate increase in Mannich++ Polymer of$0.249, increasing the
total price to $1.529 per active pound plus tax, for an estimated amount of$1,280,000
for the period July 1, 2006 through June 30, 2007.
17. Approve Amendment No. 1 to the Professional Services Consultant Agreement with
Albert Grover and Associates, providing for engineering services for the Bushard Trunk
Sewer Rehabilitation, Job No. I-24, for an additional amount of$65,000 increasing the
total amount not to exceed $153,000.
18. (a) Receive and file the letter dated March 6, 2006 from Omni Metal Finishing, Inc.,
regarding a settlement proposal for Administrative Complaint re Permit No. 2-1.520; and,
(b)Authorize the General Manager to negotiate and enter into a settlement agreement
with Omni Metal Finishing, Inc., which would impose a maximum of$55,000 in
administrative penalties against Omni and require Omni to make improvements and
additions to Omni's existing pretreatment facility to ensure compliance.
19. Closed Session
CLOSED SESSION: During the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations, pending or
potential litigation, or personnel matters, pursuant to Government Code Sections
54956.8, 54956.9, 54957 or 54957.6, as noted.
Reports relating to(a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives; or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted closed
session and are not available for public inspection. At such time as the Board takes
final action on any of these subjects, the minutes will reflect all required disclosures
of information.
03/22/06
Page 6
a. Convene in closed session, if necessary
Confer with General Counsel re pending litigation, Orange County Sanitation
District, et al. v. County of Kem, at al.,Tulare County Superior Court Case No.
189564, Government Code Section 54956.9.
b. Reconvene in regular session
C. Consideration of action, if any, on matters considered in closed session
20. Matters which a Director may wish to place on a future agenda for action and
staff report.
21. Other business and communications or supplemental agenda items, if any
22. Future Meeting Date: The next Board of Directors regular meeting is scheduled for
April 26, 2006, at 7:00 p.m.
23. Adjournment
03/22/06
Page 7
Agenda Posting: In accordance with the requirements of California Govemmerd Code Section 54954.2,this
agenda has been posted in the main lobby of the Distncrs Administrative offices not less than 72 hours prior
to the meeting date and time above. All written materials relating to each agenda item are available for pudic
inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to the Board
for discussion and/or action,it will be done in compliance with Section 54954.2(b)as an emergency item or
because there is a need to take immediate action,which need came to the attention of the Board subsequent
to the posting of agenda,or as set forth on a supplemental agenda posted in the manner as above, not less
than 72 hours prior to the meeting date.
Pudic Comments: Any member of the public may address the Board of Directors on specific agenda items or
matters of general interest. As determined by the Chair,speakers may be deferred until the specific item is
taken for discussion and remarks may be limited to three minutes.
Matters of interest addressed by a member of the public and not listed on this agenda cannot have action
taken by the Board of Directors except as authorized by Section 54954.2(b). If you wish to speak,please
complete a Speakees Fomi(located at the table outside of the Board Room)and give it to the Board
Secretary.
Consent Calendar:All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the Consent Calendar by a
Director, staff member or member of the public in attendance,there will be no separate discussion of these
items. All items on the Consent Calendar will be enacted by one action approving all motions,and casting a
unanimous ballot for resolutions included on the consent calendar. All items removed from the Consent
Calendar shall be considered in the regular order of business.
Members of the public who wish to remove an item from the Consent Calondar shall,upon recognition by the
Chair,slate their name,address and designate by number the item to be removed from the Consent
Calendar.
The Chair will determine if any items are to be deleted from the Consent Calendar.
Items Continued: Items may be continued from this meeting without further notice to a Committee or Board
meeting held within five(5)days of this meeting per Government Code Section 54954.2(b)(3).
Meeting Adjournment: This meeting may be adjourned to a later time and items of business from this agenda
may be considered at the later meeting by Order of Adjournment and Notice in accordance with Government
Code Section 54955(posted within 24 hours).
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible. If you
require any special disability related accommodations, please contact the Orange County Sanitation District
Board Secretary's office at(714)593-7130 at least 72 hours pnor to the scheduled meeting. Requests must
specify the nature of the disability and the type of accommodation requested.
03/22/06
Page 6
.........................................................................................................................................................................................................................................................................................
!NOTICE TO DIRECTORS:To place items on the agenda for the Regular Meeting of the Board of
[Directors, Items shall be submitted to the Board Secretary no later than the close of business 14 days
.preceding the Board meeting. The Board Secretary shall include on the agenda all items submitted by
!Directors,the General Manager and General Counsel and all formal communications.
Interim General Manager James D. Ruth (714)593-7110 inAh40ocsd.com
Board Secretary Penny Kyle (714)593-7130 9ylegDocsd.co
:Director/Engineering David LucWn (714)593-7300 dludwin(a)ocsd.com
;Director/Finance/Treasurer Lorenzo Tyner (714)593-7550 INnertdocsd.com
Director/Human Resources Lisa Tomko (714)593-7145 Ilomko(docsd.com
[Director/Information Technology Patrick Miles (714)593-7280 omilesOocsd.com
!Director/Operations&
i Maintenance Jim Herberg (714)5937020 Lherbera(docsd.com
Director/Technical Services Bob Ghirelli (714)593-7400 rghirelli(docsd.com
AcBng Director/Public Affairs Lisa Tomko (714)593-7145 Itomko(allmsci.com
iDirector/Regional Assets&
;Services Nick Amontes (714)593-7210 namontes(alocsd.com
[General Counsel.............................................Bred Hogin,.,.,.,.,.-....... ... j714j 594.280,8-... rh s-law.00m......-..-..................-..........
H:WeptWgendalBoard Agendasl2006 Board Agendas1032208 agenda.doe
a
P
Orange County Sanitation District
MINUTES
BOARD MEETING
February 22, 2006
1 sarolrgr�oy
c 9
C
O N
p
HE
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
Minutes for Board Meeting
Page 2 d
02/22/06
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was held on
February 22, 2006 at 7:00 p.m., in the District's Administrative Offices. Following the Pledge of
Allegiance and invocation the roll was called and the Secretary reported a quorum present as
follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Steve Anderson, Chair Steve Simonian
X James M. Ferryman,Vice Chair Arlene Schafer
X Charles Antos Paul Yost
X Don Bankhead Leland Wilson
X Carolyn Cavecche Steve Ambriz
X Alberta Christy Mike Garcia
X Larry Crandall John Collins
X Bill Dalton Mark Rosen
X Doug Davert Tony Kawashlma
X Michael Duvall Jim Winder
X Norman Eckenrode Constance Underhill
X Richard Freschi Bob Fauteux
X Sukhee Kang Steven Choi
X Phil Luebben Lydia Sondhi
A Patsy Marshall Jim Dow
X Darryl Miller Douglas Reinhart
X Roy Moore John Beauman
X Joy Neugebauer Vivian Kirkpatrick-Pilger
X Ken Parker Catherine Driscoll
X Tod Ridgeway Don Webb
X David Shawver Brian Donahue
X Harry Sidhu Bob Hernandez
X Jim Silva Lou Correa
X Dave Sullivan Debbie Cook
X i Mark Waldman Ralph Rodriguez
STAFF MEMBERS PRESENT: Jim Ruth, Interim General Manager; Penny Kyle, Board
Secretary; Nick Arhontes; Bob Ghirelli; Jim Herberg; Dave Ludwin; Patrick Miles; Lisa Tomko;
Lorenzo Tyner; Life Kovac; Jeff Reed; Layne Baroldi; Jeff Reed; Daisy Covarrubias; Mike
Moore; Mike Larkin; Paula Zeller; Simon Watson
OTHERS PRESENT: Brad Hogin, General Counsel; Larry Porter; Jan Vandersloot; Rusty
Rustan; Irwin Haydock; Eileen Murphy; Mark Miller
Minutes for Board Meeting
Page 3
02/22/06
MOVED, SECONDED AND DULY CARRIED: Receive and file minute excerpts from the
following re appointment of active and alternate Directors, as follows:
City/Agency Active Director Alternate Director
Fountain Valley Larry Crandall John Collins
Newport Beach Tod Ridgeway Don Webb
Tustin Doug Davert Tony Kawashima
Villa Park Richard A. Freschi Bob Fauteux
Board of Supervisors Jim Silva Lou Correa
PUBLIC COMMENTS
The public requested their comments be made after the update on treatment costs and level of
treatment under the General Manager's report.
REPORT OF THE CHAIR
In the absence of Chair Steve Anderson, Vice Chair Ferryman reported on the Biosolids
Compost Workshop in Fountain Valley held on February 9 . He also reported that Chair
Anderson requested the Directors'attendance to one of two CIP Orientation Workshops
scheduled for March 19 and March 29r'.
REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, referred to the monthly status report included in the
Directors' meeting folders that identifies the major issues challenging the District.
Jim Herberg, Director of Operations and Maintenance, provided a presentation on the costs
associated with the levels of treatment to wastewater discharged to the ocean.
The following persons expressed support for the District to continue the current level of
treatment to the wastewater: Rusty Rustan; Jan Vandersloot; Larry Porter; Eileen Murphy; and
Irwin Haydock.
REPORT OF THE GENERAL COUNSEL
General Counsel Brad Hogin had no report.
APPROVAL OF MINUTES
The Chair ordered that the minutes of the regular meeting held January 25, 2006, be deemed
approved as corrected.
Minutes for Board Meeting
Page 4
02/22/06
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and "B", attached hereto and made a part of these minutes.
ALL DISTRICTS 1/0 15106 01/31/06
Totals $15,960,672.83 $18,182,410.63
Director Cavecche abstained from discussion and voting on Warrant Nos. 77830 and 78010.
Director Davert abstained from discussion and voting on Warrant Nos. 77827 and 77991.
Abstentions were pursuant to California Government Code Section 84308.
CONSENT CALENDAR
9. No items considered.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE: A verbal report was presented by Vice Chair Ferryman re the
February 22, 2006 meeting.
Vice Chair Ferryman reported the Steering Committee was briefed on the meeting
between the General Manager and SAWPA. Nick Arhontes, Director of Regional Assets
and Services, reported on the SARI line breach and the repairs scheduled to be
completed the week of March 3, 2006.
Steering Committee Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Steering Committee
Minutes for the meeting held on January 25, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 1 to the
contract with James D. Ruth, Interim General Manager, extending the contract to
December 31, 2006; three weeks paid leave; and a$100,000 fife insurance
policy.
Director Crandall opposed.
Steering Committee Non-Consent Calendar
No items were considered.
Minutes for Board Meeting
Page 5
02/22/06
12. OPERATIONS MAINTENANCE AND TECHNICAL SERVICES COMMITTEE
OMTS Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Operations,
Maintenance and Technical Services Committee Minutes for the meeting held on
February 1, 2006,to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Award a contract to V&A
Consulting Engineering, Inc. for Sewer Line Video Inspection Review Services,
Specification No. S-200. -241, providing services for assessing the physical
condition of sewers from existing CCTV videotapes, for an amount not to exceed
$469,800.
C. Item pulled for discussion.
d. MOVED, SECONDED AND DULY CARRIED: (1)Authorize the General
Manager to participate in the Santa Ana Watershed Stormwater Quality Task
Force project for reevaluation of water quality standards as they relate to storm
water and dry weather flows; and,
(2)Authorize an additional amount of$20,000 for a total amount not to exceed
$30,000 to the Santa Ana Watershed Project Authority (SAWPA), for
participation in Phases II and III of the project.
Director Cavecche opposed.
e. Item pulled for discussion.
Non-Consent Calendar
C. Approve Change Order No. 5 to Purchase Order No. 101758-OB for Purchase of
Cationic Polymer, Specification No. C-2003-143, issued to Polydyne Inc.,for a
unit rate increase of$0.70 per active pound for Solution Polymer increasing the
total price to$1.75 per active pound plus tax, and a unit rate increase in Mannich
Polymer of$0.249, increasing the total price to$1.529 per active pound plus tax,
for an estimated amount of$1,280,000 for the period July 1, 2006 through
June 30, 2007.
Staff was directed to review with legal counsel the purchase order terms and
conditions to define the legitimacy of this price increase and to resubmit to the
Board of Directors in March.
MOVED, SECONDED AND DULY CARRIED: That this Rem be continued to the
March 22, 2006 Board of Directors meeting for consideration.
e. In response to Directors'questions, Nick Arhontes, Director of Regional Assets
and Services, briefed the Board members on the limited services that would be
included in the agreement with the city of Placentia. The rates charged back to
the city will be fully-burdened and services would be provided on a pre-planned,
Minutes for Board Meeting
Page 6
02/22/06 •r
scheduled basis without affecting the effectiveness of the Sanitation District's
collection systems.
MOVED, SECONDED AND DULY CARRIED: Approve a Reimbursement
Agreement with the City of Placentia for a two-year pilot project to assist the city
in improving their sewer system management program and operations and
maintenance, to achieve improved compliance with the Regional Water Quality
Control Board's Waste Discharge Requirements Order(WDR), in a form
acceptable to the General Counsel.
Director Bankhead opposed.
13. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE
PDC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Planning, Design and
Construction Committee Minutes for the special meeting held on January 26,
2006, and the regular meeting held on February 2, 2006,to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 6 to
Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk Improvements,
Contract No. 7-41; and City of Tustin Project Nos. 6106 and 6151 with ARB, Inc.,
authorizing an addition of$55,000 and five calendar days time extension,
increasing the total contract amount to$20,224,324.
C. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No. 11 to
Effluent Pump Station Annex, Job No. J-77, with J.F. Shea Construction, Inc.,
authorizing an addition of$100,302, increasing the total contract amount to
$44,393,556; and,
(2) Ratify Change Order No. 12 for an Adjustment of Engineered Quantities,
authorizing an increase of$138,502, increasing the total contract amount to
$44.532,058.
Director Davert abstained.
d. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 18 to
Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, with Steve P. Rados, Inc.,
authorizing a credit of$823,407 for deletion of work scope from the contract,
decreasing the total contract amount to$34,886,706.
e. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 25 to
Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37, with Margate
Construction, authorizing an addition of$116,822, increasing the total contract
amount to$72,088,850.
Minutes for Board Meeting
Page 7
02/22/06
f. MOVED, SECONDED AND DULY CARRIED: Approve a Professional Services
Agreement with Camp, Dresser& McKee, Inc. for engineering services for 66kV
Substation at Plant No. 1, Job No. P1-97, for an amount not to exceed $779,381.
g. MOVED, SECONDED AND DULY CARRIED: (1)Approve budget increase of
$96,000, increasing the total project budget to $3,172,000; and,
(2) Approve Amendment No. 1 to the Professional Services Agreement with M. J.
Schiff&Associates, Inc. providing for final design and construction support
services for Interplant Gas Line Rehabilitation, Job No. J-106, for an additional
amount of$119,147, increasing the total amount not to exceed $257,526.
h. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 2 to the
Professional Services Agreement with MWH Americas, Inc. to provide
construction support services for Rehabilitation of the Activated Sludge Plant at
Plant No. 2, Job No. P2-74, for an additional amount of$564,338, increasing the
total contract amount not to exceed $2,753,699.
I. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 5 to the
Professional Services Agreement with Lee& Ro, Inc., providing for additional
design engineering services for Replacement of the Bitter Point Pump Station,
Contract No. 5-49; Replacement of the Rocky Point Pump Station, Contract No.
5-50; Rehabilitation of the le Street Pump Station, Contract No. 5-51; and
Rehabilitation of the"A" Street Pump Station, Contract No. 5-52, for an additional
amount of$1,017,316, increasing the total amount not to exceed $4,480,816.
j. MOVED, SECONDED AND DULY CARRIED: Authorize the General Manager to
enter into a sole source agreement with Southern California Edison for the
procurement of a temporary power service connection at the intersection of Ellis
Avenue and Bushard Street in connection with Bushard Trunk Sewer
Rehabilitation, Job No. 1-24,for the duration of construction at the intersection,
for an estimated amount of$350,000.
k. MOVED, SECONDED AND DULY CARRIED: Approve time extensions to
Cooperative Project Contract Agreements: Contract No. 0403 with Costa Mesa
Sanitary District; Contract No. D409 with Garden Grove Sanitary District; Contract
No. 0404 with the City of Fountain Valley; and Contract No. 0130 with the City of
Orange.
I. MOVED, SECONDED AND DULY CARRIED: Approve a budget amendment of
$1,511,800 for a total project budget of$3,810,376 for Realignment and
Rehabilitation of the Big Canyon Offslte Trunk Sewer, Contract No. 5-62.
Non-Consent Calendar
No items were considered.
Minutes for Board Meeting
Page 8
02/22/06
14. FINANCE, ADMINSTRATION AND HUMAN RESOURCES COMMITTEE
FAHR Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Finance,
Administration and Human Resources Committee Minutes for the meeting held
on February 8, 2006, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Receive and file report of General
Manager approved purchases in amounts exceeding $50,000 in accordance with
Board purchasing policies.
C. MOVED, SECONDED AND DULY CARRIED: Receive and file the FY 2005-06
Quarterly and Mid-Year Consolidated Financial Reports for the period ended
December 31, 2005,
Director Christy abstained.
d. MOVED, SECONDED AND DULY CARRIED: Approve the FY 2006-07 and FY
2007-08 Budget Assumptions and direct staff to prepare the FY 2006-07—2007-
O8 Budgets incorporating these parameters.
e. MOVED, SECONDED AND DULY CARRIED: (1)Approve a Purchase Order
Contract with Lance, Soil & Lunghard, Certified Public Accountants, as the
District's contracted internal auditors for FY 2005-08, for the period of March 1,
2006 through February 28, 2007, for an amount not to exceed $58,670, with an
option to renew the contract for two one-year periods based on approval by the
FAHR Committee; and,
(2) Direct Lance, Soil & Lunghard to perform specific internal auditing
assignments as the FAHR Committee deems necessary.
f. MOVED, SECONDED AND DULY CARRIED: Approve revised pricing with
Cambridge Integrated Services Group, Inc. for third-party administration of
Workers' Compensation as provided In Flat Fee Option B.
g. MOVED, SECONDED AND DULY CARRIED: (1)Adopt Resolution No.
OCSD06-02, a Resolution of the Board of Directors of the Orange County
Sanitation District Authorizing the Execution and Delivery by the District of an
Installment Purchase Agreement, a Trust Agreement, a Standby Certificate
Purchase Agreement, a Purchase Contract and a Remarketing Agreement in
connection with the execution and delivery of Orange County Sanitation District
Certificates of Participation, Series 2006, Authorizing the Execution and Delivery
of such Certificates Evidencing Principal in an Aggregate Amount of Not to
Exceed $200,000,000, Authorizing the Distribution of an Official Statement in
Connection Therewith and Authorizing the Execution of Necessary Documents
and Certificates and Related Actions.
Director Christy abstained.
Minutes for Board Meeting
Page 9
02/22/06
FAHR Non-Consent Calendar
No items were considered.
15. CIP OVERSIGHT COMMITTEE
CIP Oversight Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order the draft CIP Oversight
Committee Minutes for the meeting held on February 9, 2006, to be filed.
Committee Chair Luebben provided a brief review of the complexities reviewed
by the Committee on the Capital Improvement Program, and encouraged all
Directors to attend one of the two workshops to be held on March 15 and
March 29, in order to consider several scenarios and make informed decisions as
they relate to the user rate increases.
CIP Oversight Non-Consent Calendar
No items were considered.
16. LEGISLATIVE AFFAIRS COMMITTEE
Legislative Affairs Committee Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Legislative Affairs
Committee Minutes for the meeting held on February 14, 2006, to be filed.
Legislative Affairs Committee Non-Consent Calendar
No items were considered.
17, GWR SYSTEM STEERING COMMITTEE
GWRSSC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Steering Committee Minutes for the meeting held on
January 9, 2006, to be filed.
GWRSSC Non-Consent Calendar
No items were considered.
Minutes for Board Meeting 1
Page 10
02/22/06
NON-CONSENT CALENDAR
18. MOVED, SECONDED AND DULY CARRIED: (1)Adopt Resolution No. OCSD 06-03,
Certifying the Initial Study/Negative Declaration for the College Avenue Pump Station
Rehabilitation Project, Contract No. 7-47, prepared by CH2MHill; and (2)Approve the
College Avenue Pump Station Rehabilitation Project, Contract No. 7-47.
19, MOVED, SECONDED AND DULY CARRIED: Consideration of the following actions
regarding environmental documentation required to modify the certified 1999 Strategic
Plan Final Program Environmental Impact Report(PEIR):
(a) Receive and file Addendum No. 8 to 1999 PEIR for the Bushard Trunk Sewer
Rehabilitation, Job No. 1-24, prepared by Environmental Science Associates;
(b)Approve a budget amendment of$2,000,000 increasing the total project budget to
$65,580,000;
(c)Approve Plans and Specifications for Bushard Trunk Sewer Rehabilitation, Job
No. 1-2-4A, on file at the office of the Board Secretary;
(d)Approve Addenda Nos. 1, 2, 3, 4, and 5 to the plans and specifications;
(a) Receive and file bid tabulation and recommendation; and,
(f)Award a construction contract to Mike Bubalo Construction Co., Inc. for Bushard
Trunk Sewer Rehabilitation, Job No. 1-2-4A, for an amount not to exceed $11,191,500.
20. Vice Chair Ferryman declared a recess of the Board of Directors of the Orange County
Sanitation District at 8:31 p.m.
ORANGE COUNTY SANITATION DISTRICT FINANCING CORPORATION
ROLL CALL
A regular meeting of the board of Directors of the Orange County Sanitation District
Financing Corporation (OCSDFC)was called to order on February 22, 2006 at 8:32 p.m., in the
District's Administrative Offices. The roll was called, Director Christy removed herself from the
room, and the Secretary reported a quorum present as follows:
Minutes for Board Meeting
Page 11
02/22/06
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Steve Anderson, Chair Steve Simonlan
X James M. Ferryman, Vice Chair Arlene Schafer
X Charles Antos Paul Yost
X Don Bankhead Leland Wilson
X Carolyn Cavecche Steve Ambdz
A Alberta Christy Mike Garcia
X Larry Crandall John Collins
X Bill Dalton Mark Rosen
X Doug Davert Tony Kawashima
X Michael Duvall Jim Winder
X Norman Eckenrode Constance Underhill
X Richard Freschi Bob Fauteux
X Sukhee Kang Steven Choi
X Phil Luebben Lydia Sondhi
A Patsy Marshall Jim Dow
X Darryl Miller Douglas Reinhart
X Roy Moore John Beauman
X Joy Neugebauer Vivian Kirkpatrick-Pilger
X Ken Parker Catherine Driscoll _
X Tod Ridgeway Don Webb
X David Shawver Brian Donahue
X Harry Sidhu Bob Hernandez
X Jim Silva Lou Correa
X Dave Sullivan Debbie Cook
X Mark Waldman Ralph Rodriguez
STAFF MEMBERS PRESENT: Jim Ruth, Interim General Manager; Penny Kyle, Board
Secretary; Nick Arhontes; Bob Ghirelli; Jim Herberg; Dave Ludwin; Patrick Miles; Lisa Tomko;
Lorenzo Tyner; Lilia Kovac; Jeff Reed; Layne Baroldi; Jeff Reed; Daisy Covarrubias; Mike
Moore; Mike Larkin; Paula Zeller; Simon Watson
OTHERS PRESENT: Brad Hogin, General Counsel; Larry Porter; Jan Vandersloot; Rusty
Rustan; Irwin Haydock; Eileen Murphy; Mark Miller
APPROVAL OF MINUTES
The Vice Chair ordered that the minutes of the regular meeting held June 22, 2005, be deemed
approved, as written.
Minutes for Board Meeting j
Page 12
02/22/06
REPORT OF THE DIRECTOR OF FINANCE
Lorenzo Tyner, Director of Finance, reported that the Financing Corporation Board is required to
meet annually.
MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. FC-03,Authorizing the
Execution and Delivery by the Corporation of an Installment Purchase Agreement and a Trust
Agreement in connection with the execution and delivery of Orange County Sanitation District
Certificates of Participation, Series 2006;Authorizing the Execution and Delivery of such
Certificates Evidencing Principal in an Aggregate Amount of Not to Exceed $200,000.000 and;
Authorizing the Execution of Necessary Documents and Certificates and Related Actions..
ADJOURNMENT: The Vice Chair declared the meeting of the Orange County Sanitation
District Financing Corporation adjourned at 8:35 p.m.
23. Reconvene, Board of Directors, Orange County Sanitation District.
24. There was no dosed session.
25. Director Miller suggested further discussion on the Sanitation District's regional activity
on watershed operations.
ADJOURNMENT: The Chair declared the meeting adjourned at 8:36 p.m.
t /e
Penny M. Kyl
Secretary to the Board of Wirectors of
Orange County Sanitation District
H Wepragenda\Board NnuresLM Bmd MinutmXO22206 minutes.tloc
F BOARD OF DIRECTORS MeeOng Dare TOBd.ordr.
f 03/22/06
AGENDA REPORT Item Number tern Number
8
Orange County Sanitation District
FROM: Lorenzo Tyner, Director of Finance/Treasurer
Originator: Lenora Crane, Executive Assistant
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION
DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
CONFLICT OF INTEREST NOTIFICATION
Pursuant to Government Code Section 84308, you are required to disclose any
campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving the Orange County Sanitation District. Further, you may
not participate in the decision making process to award a contract to such party.
For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with the District.
In general, you must disclose the basis of the conflict by identifying the name of the firm
or individual who was the contributor.
For the specks of Government Code Section 84308, please see your Director's
Handbook or call the office of General Counsel.
SUMMARY
See attached listing.
PRIOR COMMITTEEIBOARD ACTIONS
N/A
ATTACHMENTS
1. Copies of Claims Paid reports from 02/01/06 to 02/15/06 and 02/16/06 to 02/28/06
H:WepMgenda%Board Agenda ReWM%2006 Board Agenda&Agenda ReporlsW306Wem 8.0aims Paid.dm
Revised: 06N4103
Clelms Paid From 1XL01106 to 0211 NOG
Warrant No. Vendor Amount 0ascripdon
Accounts Payable-Warrants
78403 Orange County Mier District $ 7,464,950.32 OWNS Project J-36
78404 Southern California Edison 205,745.83 Powder
78405 Southern California Edison 51,397.89 Paver
7840E US Peroxide,L.L.C. 50,761.34 Odor&Corrosion Ctd.Treatment for Coll.Sys,Hydrogen Peroxide&Ferrous Chloride
78407 Anteticen Telephone&Telegraph Corp. 649.92 Long Distance Telephone Service
7840E Aigas West 8.06 Demurrage
78409 Appleone Employment Service 6,9W.97 Temporary Employment Services
7841D ASCE Continuing Education 249.00 Meeting Registration
78411 ASTD 169.00 Membamhip
75412 Basic Chemical Solutions,L.L.C. 22.584.18 Sodium Hydroxide
78413 Court Troslee 90.89 Wage Garnishment
79414 California Soil Produce 15.749.77 Residuals Removal MO 3-29-95
76445 CAPPO Conk..Registration 330.OD Purchasing Meeting Registration
78416 CMAA 395.0D Training Registration(Construction Management Association of America)
78417 Compressor Components of California 7,499.40 Valves
78418 Consumers Pipe&Supply Co. 140.98 Plumbing Paris&Supplies
78419 Corelink SkHng Services.Inc. 2.020.32 Temporary Employment Services
75420 County of Orange 15D.aD Wage Gamishmenl
78421 CWEA Membership 3,405.OD Membership and Training&Meetlrg Registrations
78422 Davlds True Service 3.500.OD Tree Mainl.Service
73423 Department of Child Supped Somme 300.00 Wage Garnishment
78424 Ecology Consul industries 2061.00 Hacandous Waste Disposal
78425 Employee Benefits Specialists,Inc. 10,643.23 Reimbursed Prepaid Employee Medical&Dependent Care
78426 Court Order A 15.00 Wage Garnishment
79427 Fisher Scientific Company,L.L.C. 2.695AS Lab Parts&Supplies
78428 Franchise Tax Board 50.00 Wage Garnishment
78429 City of Fullerton 383.65 Water Use
784M City of Huntington Beach 13,903.55 Water Use
78431 Internal Revenue Service 125.00 Wage Garnishment
78432 Intl.Union doper.Eng.AN CIO Local 501 4529.89 Dues Deduction
78433 Irvine Ranch Water DisMG 41.61 Water Use
78434 KFORCE,Ix. 1,372.80 Temporary Employment Services
78435 IA TesBrg 175.00 Asbesks Analyses
78436 Court Order 150.00 Wage Garnishment
78437 Wexi's Gourmet Footle,Inc. 15.36 Meeting Expense
76438 Material and Contract Services 3.968.00 Temporary Employment Servkxs
78439 McMaster Carr Supply Co. 680.05 Electrical and Mechanical Pans&Supplies
78440 Mettler Toletlo 108.28 Instrument Calibration Service
78441 Midway Mfg.&Machining Co. 7.414.02 Repair&Maintenance Services
79442 Court Order 225.00 Wage Garnishment
78443 National Bond&Trost 2.681.92 U.S.Savings Bonds Payroll Deductions
78444 NRG Thermal Services,L.L.C. 1,861.92 Mechanical Parts&Supplies
78445 O C Tanner Recognition Company 1,286.35 Employee Service Awards Program
78446 COS Reprographics 476.85 Printing Service-MO 1426100
78447 OCEA 641.29 Dues Deduction
78448 Orange County Shand 85.00 Wage Garnishment
78449 Pacific lnvemineof Management Co. 22.517.00 Immstruent Management Service Res.95-97
N WzpnlmlE%CEL41aV3PMS1URE1Clann P.4 Repm Misx'vne Peol Repent-02.15M EXHIBITA
unalm Page 1 of 10 wi..
Claims Paid From 02101108 to 02116108
Warrant No. Vendor Amount DeverlPuon
78450 Peace Olflra s Council of CA 1,802.00 Dues Deduction,Supervisors&Professionals
78451 Poydyna.Inc. 22.024.74 Cationic Poymer MO 3.11-92
78452 Reliasler Bankers Security Life Ins. 8,376.44 Voluntary Life Ins.,Cancer Ina.&Supplemental Short-Term Disebily,Ins.
73463 SBC 1,448.911 Telephone Services
794M Smith Pipe&Supply 43.64 Landscape migration Supplies
78455 Court Order 721.50 Wage Garnishment
78456 Se.Col Gee Company 2,268.59 Natural Gas
78457 Southern California Gas Company 20.642.00 Conslruclion Pi-82
78458 Sporkle5s 1.635.55 Drinking Water/Cooler RentaN
78458 Sunset Ford 37.D4 Vehicle Pads&Service
78460 TEKsyafema 7.707.00 Temporary Employment Services
78461 Thompson Industrial Suppy.Inc. 2.397.70 Mechanical Pens&Supplies
76462 UC Regents 5.079.63 Prof.Sew.-Straleglc Planning Study Re Impact of Wastewater on Fishery Health
78463 United Stales Postal Service 5,000.00 Postage
78464 United Way 105.00 Employee Conhibutlons
78465 URISA 150.00 Membenhip
78466 Venison California 06.42 Telephone Services
76467 Millions,Inc. 630.00 Installation of Carpeting at Plant
78468 WEF 144.00 Membership-Water Environment Federation
78469 WEF Registration Dept. 496.00 Employee Developmenl&Training DNislon Meeting Registration
79470 WOI 500.00 Training Registration
78471 Xyon Business Solullons,Inc. 18.000.00 Temporary Employment Services
78472 Court Order 597.50 Wage Garnishment
78473 Nicholas J.Arbonles 103.35 MeetinglTraining Expense Reimbursement
75474 Kann I.BemMl 50.00 MeefingTraining Expense Reimbursement
79475 Oeirdn E.Bingman 25.00 Meeting/Training Expense Reimbursement
78476 Victoria L.Francis 297.10 Meetingffmining Expense Reimbursement
78477 Randy E.Hants 58.00 Meeting7Tmining Expense Reimbursement
78478 Pamela A.Koester 241.00 Meetingffralning Expense Relmbumsmenl
78479 Vfedimlr A.Kogan 316.29 Meetingffmining Expense Reimbursement
78480 Lourdes Lune 77.63 Meeting77maing Expense Reimbursement
78481 Samlr Pale) 574.97 MeelingRmining Expense Reimbursement
78482 Sarah Redirper 12.00 MeetinglTraining Exponce Reimbursement
78483 Waller W.WI iams 63.00 Meeting7Treining Expense Reimbursement
78484 Paula A.Zeller 263.96 Meeting Training Expense Reimbursement
78485 Voided Check - -
78486 CWEA Membership 320.00 Training Registration
78457 California Head Association 689.50 Fitness for Duty Examination
78488 Boyle Engineering Corporation 34.035.18 Professional Services 1.2.4
78480 Brown&CeMwell 243.292.58 Professional Services P1417,P2-01&CMOMAVDR Program
78490 Carollo Engineers 87,707.91 Prof.Sam. P2.66
78491 Earth Tech,Inc. 243,579.95 Professional Services P2.79&P1400
78492 GHD,L.L.C. 33,874.60 Prohialonsl Services-Asset Management Program
78493 HOR Engineering,Inc. 238.988.21 Professional Services Pt-82&P1.101
78494 Kemiran Companies.Inc. 137,37D.86 Fenlc Chloride
79495 Melllte Life Insurance Company 36.649.59 Group Life,Manager Add%Lie,Short&Long-Tenn Disability 8 Optional Term Life Ins.
78488 Occidental Energy Marketing,Inc. 59,956.54 Helmet Gas for CenGerdCOGen
79497 Orange County Water District 76,249.28 GAP Water Use
N xJM1VW EXCEL 41e173 W PSHRRfl(IMxns Pad Re xvA06k0MWme Pail Repon-M-15Ue EXHIBIT A
snr2lMs Page 2 of 10 vlsrzcae e
Claims Paid Fred 02/01106 to 0311546
Warrant No. Vendor Anodes Description
78498 Pacific Investment Management Co. 85,794.00 Investment Management Sarvke Rea.96.97
78498 Pioneer Anteroom Inc. 193,431.35 Sodium Hypochlonte
78500 Poydyne,Inc. 34,987.50 Cationic Polymer MO 3-11-92
78501 Tule RarmhlMagan Farms 219.187.96 Residuab Removal MO 3-29-95
78502 US Permits,L.L.C. 152,867.36 Odor&Corrosion Cad.Trammed for Coll.Sys.;Hydrogen Peroxide&Ferrous Chloride
78603 Waste Markets 53,213.59 Main.Agreement-Grit It Screenings Removal&Digester Bad MaD.Removal
785N Woodruff Sprodlin&Sound 55,501.37 Legal Services MO 7-26-95
78505 Fleming Emimnmental,Inc. 62,802.00 Contraction FE05-32
785M J F Shea Construction,Inc. 1,177,038.61 Construction P268,J-77&l35-2
78507 J R Fllanc Construction 1.828.668.70 Construction P1-82
78508 Mergers,Construction.Ix. 560,431.00 Construction Pt-3T
78609 Mormw Meadows Cod. 162.316.00 Conduction ucton P247-3
78510 Shasta Electric,L.P. 91.613.00 Construction SP-94
78511 Southern Connecting Company 35,200.00 Contrucion J-33-1
78512 Wastam Pump,Inc. 115,600.00 Construction FE05-34
78513 A W Chesterton 4,50.31 Mechanical Pads&Supplies
78514 Abbott Industries,Inc. 4.332.00 Repairs&Malnt.Service-Replacement of Admin.Bldg.Awning Fabric
78515 Absolute Standards,Inc. 960.00 Lab Pads It Supplies
78516 Accounting Options,Inc. 4.497.50 Temporary Employment Services
78517 Accustandard,Inc. 287.80 Lab Pads&Supplies
78518 Air Products&Chemicals,Inc. 5,965.97 Professional Services P247-3
78619 Airgas Safety.Inc 03.57 Safety Supplies
78520 Aides West 1,106.1E Specialty Gases
78521 Airway Packing&Shipping,Inc. 1221.27 Shipping of Oaaenographic Equip,to Manufacturer for Wananly Repars&Upgrades
78522 Allied Packing&Rubber,Inc. 109.07 Mechanical Pads&Supplies
78523 Amnon Air Fiber,Inc 273.08 Air Filter Media&Related Services
78524 American Chemical Society 154.00 Membership
75525 Amedcen Fildeliky Assurance Company 344.40 Voluntary Employee Cancer Insurance
7&526 Applegne Employment Service 2,W1.60 Temporary Employment Services
78527 Archie IW,Inc. 5,957.00 Spread Maintenance-Slurry Coaling
7028 AMA 150.00 Membership(Ademan Water Works Association)
78529 Baker Tanks 582.40 Tank Rentals
78530 Basic Chemical Solutions,L.L.C. 21.344.07 Sodium Biaullite&Sodium Hydrexide
78531 BEC Building Electronic Controls,Inc 3,735.00 Fire Alarm System Maintenance,Repair It Quarterly Inspection
78532 Berendsen Fluid Power 462.10 Mechanical Paris&Supplies
78533 Biospherical Instruments,Inc. 198.76 Instrument Repairs It Maintenance
78534 Black&Veatch Corporation 16.725.00 Pmfesslonal Services,1400
78535 Black Box Corporation 344.36 Computer Hardware SoBware
78536 BMC Business Machines Cmuullanh,Inc. 5,530.53 Pinker HP 1320n
78537 Bush&Associates,Inc. I1,8n.00 Professional Services 7-36&741
78538 CALPELRA 530.00 Membership
78539 Cambridge Isotope Labs 1,889.34 Lab Pads&Supplies
78540 Cad Warren&Co. 306.18 Insurance Claims Administrator
78541 Volded Check - -
78542 Cmgalarwietass 483.74 Wireless Services
78543 Columbia Analytical Services,Inc 7,926.00 Analysis of Wastewater,Industrial Wastewater&BiosolMs
78544 CSI Canpulatmed Systems 1,331.85 Super Slow Technical Measurement Package
78545 Con Way Weekend Express 667.39 Freight
RMepaaalPxc0..wWZIMParNRElgWns Pad Wnono0 encpime Pee Read-02-16a3 EXHIBITA
nW2lft Page 3 of 10 WIM005
Clalme Paid From 02101106 to 02I15106
Warrant No. Vander Amount Description
78546 Consolidated Electoral Distributers,Inc. 2,399.81 Electrical Pads&Supplies
78547 Consumers Pipe&Supply Co. 6.564.86 Plumbing Pads&Supplies
78648 Controlled Motion Solutions 430.40 Pumps
78549 Cooper Camemn Corporation 2,318.21 Engine Supplies
7800 Corporate Image Maintenance.Inc 168.00 Custodial Services Spec,No.989l
78551 County Wholesale Electric Co. 81.83 Electrical Parts&Supplies
78552 Crane Veyor Corp. 2.320.00 Maintenance Agreement-Only.Inspections B Codifications
78553 CVVEA 2002 Annual Conference 560.00 Training Registration(Calif.Watm Env.Assoc.)&Source Control Div.Meeting Reg.
78554 CWEA Membership 200.00 Membership(Calif.Water Environment Assoc.)
78555 CWEA 225.00 Notices&Ads
78556 0 R Mcealty&Associates 1,195.00 Training Registration
78557 Del Mar Analytical 332.00 Analysis of Siowlids
7856E Desert Pumps&Pans.Inc. 4.589.01 Pump Parts&Supplies
78559 Doug Norwood Supply 221.71 Amoral Time&Data Stamp Repairs
78W E Sam Jones Distributors,Inc. 53.34 ElecWcal Parts&Supplies
78581 Edinger Medical Group,Inc. 555.00 Medical Screenings
78M Enchanter,Inc. 6,925.00 Ocean Montlpnng&Outlet Inspection&Maintenance
78563 ENS Resources,Inc, 10.000.00 Professional Services-Legislative Advocate
7804 Environmental Resource Association 1AI6.58 Lab Pads&Supplies
78665 Equipment Specialties Co. 3,269.00 Piranha Trash Slurry Pump
78566 Ewlnt bill Industrial 464.83 Landscape Initiation Paris&Supplies
78567 Expenune 910.00 SOBware Maintenance
78568 Express Lens tab 2.148.89 Safely Glasses
78569 Fanned Corrosion Control Co. 2,510.58 Instrument Pam&Supplies
78570 Fill Corporation 24,901.18 Software Maintenance Agreement
78571 First American Real Estate Solutions 280.50 Online Orange County Property Information
78572 Faher Scientific Company.L.L.C. 8,986.34 Lab Pads&Supplies
79573 Flat&VerBcal,Inc. 269.50 Co.Drilling
78574 Forma Engineering&Surveying,inn 453.90 Surveying Services-Various Capital Projects
78575 Frys Eleclmnus 168.03 Computer Supplies
78576 Ganahl Lumber Company 967.27 Lumber/Hardware
78577 Gales Fiberglass installers 2,031.00 Fiberglass Repair
78578 Geomatrh Consultant,Inc. 8.260.00 Sors,Concrete&Other Materiels Testing
78579 Gilmour Group On Lippincott Co. 1.200.00 Hoses
78580 Goldenwest Window Service 1.05.00 Landscape Maintenance&Window Cleaning Services
78551 Grainger,Inc. 392.61 Electrical Parts&Supplies
78582 Graybar Electric Company 9,027.49 Electrical Pam&Supplies
78583 He&oto Penton Industries 185.21 Freight Chagas
785" Harold Primrose Ice 80.W Ice For Samples
78585 Hi Standard Automotive 198.69 Automotive Paris&Supplies
78586 Hill Brothers 14,951.44 Chemicals-Odor&Corrosion Control-Newport Trunk9ne
78587 Home Depot 1,179.78 Misr:.Repair&Maintenance Matrial
78580 Hose Express,L.LC..dim Pilot Santa Ana 2,11l How Replacement-Emergency Generator 02
78589 Hub Aso Supply 17A3 Vehicle Paris&Supplies
78590 Industrial Distribution Group 7,513.51 Mechanical Pans&Supplies
78591 Industrial Metal Supply 4,953,03 Metal
78692 Inorganic Ventures,Ina 1,02588 lab Parts&Supplies
78593 Ironman Pans&Services 183.00 Mechanical Pads&Supplies
Hwvvovv E.xCEL41N2UAP5RME1C1tims Pud ReporpreancYme Pns now-M-15Ca ExHIBITA
fntheac Page 4 of 10 wMem
Claim Paid From 0=1106 to OLt&/08
Warned No. Vendor Amount Description
78594 Irvine Ranch Water District 6.33 Water Use
78595 JG Tucker And Son,Inc. 2.600.83 Repair&Annual Certification of Manhole Safety Hoist
78585 Jensen Instrument Co. 1,957.7D Pressure Gauge
78597 Johnstone Supply 624.15 Mechanical Pad.If Supplies
78596 Keith Boger $70.00 Training Registration
78598 Kforos Professional Skilled 2.981.55 Temporary Employment Services
78600 Klelnfelder,Inc. MUD Sods,Concrete&Other Materials Testing
78601 Lab Safety Supply,Inc. 641.75 Lab Pads&Supplies
78602 Lee&Re,Inc. 5.037.52 Professional Services P247-3
78603 Lesls Ness Matthew Bender 418.95 Books&Publications
78604 LINJER 5.398.24 PlAssllonal Service-DART MO 9.22-99
75005 Long Beach Iron Works 042.82 Manhole Frames&Covers
78606 Luedtke Crane Systems,L.L.C. 2,306.96 Repairs It Maintenance Services
78807 Maintenance Products,Inc. 4,508.11 Mechanical Pads&Supplies
78508 Maintenance Technology Corp. 1.449.04 Mechanlol Pads&Supplies
78009 Masker Distributors 63.70 Mechanical Pads&Supplies
78510 Material And Contract Services 4.960.00 Temporary Employment Services
78011 Maureen Kane&Associates a80.00 Training Registration
78512 Mayer Brown Rome&Maw.L.L.P. 4.822.0 Proessional Services-Strategic Planning At Advocacy
78613 Mc Junkin Corp. 131.27 Plumbing Supplies
76614 McMaster Carr Supply Co. 1.997.98 Mechanical Pals&Suppl[es
78615 MCR Technologies,Inc. 711.15 Plumbing Pads&Supplies
78616 Media Resurfacing Systems,Inc. 400.00 Vehicle Repairs&Maintenance Services-V-522
78817 Mellon Trust 23,485.19 Investment Custodian Bank
78618 Mid Weal Associates 14,048.74 Pump,Pump Pads&Lube Hose
78619 Midway Mfg.&Machining Co. 4,591.13 Mechanical Pad.If Supplies
78620 Mission Abrasive&Janitorial Supplies 371.95 Janitorial Supplies
75621 Motion Industries.Inc.CA 55 2,035.36 Mechanical Pads&Supplies
76622 MVM Americas.Inc. 9.282,36 Professional Services P244
78623 Neal Supply Co. 988.52 Plumbing Supplies
78624 NRG Thermal Services,L.L.C. 2.824.52 Mechanical Paris&Supplies
78625 NWRI National Water Research Institute 2,500.00 Sponsorship-2006 ChildreWs Water Education Festival
78628 OCB Reprognphks 9.173.94 Printing Service-MO lW(d)
78627 01 Analytical 200.76 Lab Pads&Supplies
78528 011nergy.Com 06.60 Neural Gas
78629 Omega industrial Suppy.Inc. 1,133.16 Janllorlal Supplies
78630 OMRON IOM Controls,Inc. 1,379.85 Instrument Pads It Supplies
78631 Onasource Distributors,Inc. 2,182.35 Electrical Pads&Supplies
78632 Oracle Corporation 10R18.74 Safiware Update License&Support
78633 Orange County Sanitation District 18.469.17 Mrkeh Comp.Poland.
78634 Orange FNId System Technologies,Inc. 310.15 Plumbing Pads&Supplies
78635 Oxygen Service Company 113.12 Specialty Gases
TIMMS Padflc Mechanical Supply 852AI Plumbing Supplies
78837 Pacific Pads&Controls,Inc. 978.37 Duct Sealer&Maintenance Materiels
75038 Parsons Water At Infrastructure.Inc. 12.476.20 Professional Services J-35.1
78639 PCG Industries, 1.380.00 Oulalde Lab services
78640 PCS Express,Inc. 122.00 Coulon Service
70641 Penvaive 2.158.00 Plumbing Parts&Supplies
Hldvw iM XCEl.OQ20KWPSI NRE1 Wime Pan]RepwM9eMWime Pala Repari-02-I5L8 EXHIBIT A
NMIMe Page 5 of 10 31361006
CYkrre Paid From 02101106 W 04/16106
Warrant No. Vendor Annount Description
78542 Peildnlilmer LAS 564.00 Fillers
78643 PL Hawn Comparry.Inc. 1,302.18 Electrcal Paris&Supplies
700N Power Elecrp Supply Co.,Inc. 28.13 Electrical Paris&Supplies
78645 Praxor Distribution.Inc. 26.99 Demurage
78646 Praxalr.Inc. 332.95 Lab Paris&Supplies
78647 Pro Paid Legal Services,Inc. 574.00 Employee Legal Service Insurance Premium
781 Pdnterguy 4.566.03 Printer Maintenance
78649 Proleot Management Ins9Nte 154.00 Membership
78650 Propipe 7AS3.34 CCTV Sewerfine Inspections
78651 PRSA Orange County Chapter 75.00 Nodose&Ads(Public Relations Society of America)
78552 Prudential Overall Supply 4,479.45 Uniforms&Related Articles
78653 PS TEK,L.L.C. 1,183.67 Filter Element
78654 Public Resources Adx1sory Group 6,000.00 Financial Advisory Services
78655 Quartermaster.Inc. 0.80 Safely Supplies
7a655 R L Abbott&Associates 3,000.00 Kam Counly eiosolids Consulting Services
78657 Rainbow Disposal Co. 2,973.12 Trash Removal
78658 Restek Corp. 418.41 Lab Parts&Supplies
78659 Riceh Business System 1,623.90 Color Copier Lease
78660 Rise In The Rain 187.72 Lab Pads&Supplies
78661 Rockhurst College Continuing Education 195.00 Engineering Administration Division Meeting Registration
78662 Royale Cleaners 6.00 Dry Cleaning Services
78663 RPM Electric Motors 1,946.43 Motor Repair&Maintenance Services
78604 Sancen Engineering,Inc. 12,535.00 Manhole Rehabilitation Program
78665 SARBS 125.00 Training Registration
78666 SBCIMCI 757.68 Telephone Services
785W Schi6Associates 2.2541.11 PMessional Services J-106
78668 Schwin9 America.Inc. 10,001.07 Pump Paris&Supplies
78NS Schwing America,Inc. 4.13025 Pump Pads&Supplies
78670 Scotlel Voice&Data,Inc. 2,284.80 Telephone System Maintenance
78671 Self Insurance Plans 2.809.0 State Workers'Compe usadon User Fulling&Assessment
78672 Shamrock Supply Co.,Inc. 1,814.19 Hand Cleaner&Concrete Mix
78873 Shweluck Sales&Engineering 135.56 Mechanical Pads&Supplies
78674 Sigma Aldrich.Inc. 169.59 Lab Parts&Supplies
78675 SKC West.Inc. 4,156.20 Tedlar Bags&Instrument Supplies
78676 Smith Poe&Supply 1,347.95 Landscape Initiation Supplies
78677 Southern California Edison 6.968.14 Power
7W78 Southern California Trans Service 3.704.14 Mechanical Pads&Supplies
78679 Spe%Cediprep,Inc. 815.23 Lab Pads&Supplies
78680 Square D Company 2b25.00 Training Registratbn
78681 Summit Steel 2,049.95 Metal
78882 Sunset Ford 23.14 Vehcle Paris&Service
78683 Sunset Industrial Peels 94.74 Mechanical Pads&Supplies
78684 Systime Computer Cwp. 2,970.00 Prof.Sam.-EnteariseOne FIS System Upgrade
78685 Teledyne Electrmdc Tech. W.02 Instrument Pads&Supplies
78685 Thompson Industrial Supply,Inc. 4,072.11 Mechanical Pads&Supplies
78687 Time Warner Communication 51.07 Cable Services
78688 Trays Lock&Safe Service&Sales 617.93 Latlu&Keys
78689 Truck&Auto Supply,Inc. 559.61 Automotive Supplies
H Ykpe4ME%CEL NaV34t4P5H4PFCla'was PaN RepaMM-0Mlbmz Pro RpM-02-154I EXHIBITA
rvYl+a9c Page 6 of 10 Y134e]5
Claim Paid From 92AIim6 to 0115196
Warrant No. Vendor Amount Description
78690 US FIBer/Poymetdm,Inc. 859.01 Service Agreement-DI Water Systems at Plants t&2
78691 UUm 125.97 Office Supplies
78092 Ultra Scientific 1.225.64 Lab Pads&Supplies
78693 Underground Service Alen of So.Calif 1,311.30 Membership-Underground Utility IdentificallonMoliBcadpn Service
78694 United Pacific Services,Inc. 13.336.99 landscape Maintenance at Plants 1&2 and Pump Stations
78695 United Parcel Service 2,089.36 Parcel Services
78696 United Pumping Service 1.380.50 Pumping Service
78697 UNIVAR USA 1,346.88 Chloride
78698 US AlmorMlBoning Distributors,Inc. 827.31 Electrical Pads&Supplies
78698 Valley Spiking Co. 1,500.00 Equipment Repair
7870D Vapex,Inc. 9.102.00 Instrument Pens&Supplies
78701 Varian,Inc. 1,651.24 Lab Parts&Supplies
78702 Verizon California 714.22 Telephone Services
78703 Wines Plumbing 90.00 Service Contract-Testing&Cad.BackBow Devices at Plus,t &2&Pump Sla.
78704 Vmsler&Company 3,625.65 Mechanical Parts&Supplies
78705 VVVR Scientific Products 7.672.18 lab Pads&Supplies
78706 Wastewater Technology Trainers 495.00 Training Registration
78707 The Wackenhut Corporation 3,828.44 Security Guards
78708 Waxle Sanitary Supply 1,163.91 Janitorial Supplies
78709 WEF 1,103.00 Membership-Water Environment Federal
79710 West Coast Safety Supply Co. 914.05 Safety Supplies
78711 West Hie Supply Company,Inc. 1,102.05 Electrical Pads&Supplies
78712 Western Slates Controls 2,270.46 Electrical Pans&Supplies
78713 Western Switches&Controls,Inc. 61.62 Electrical Pena If Supplies
78714 Weslmerk Paid Co. 253.09 Painting Supplies
78715 California Bank&Third 1,852.00 Construction J-33-IA,Retention
78716 Joked E.Mop 85.00 MeelingRmining Expense Reimbursement
78717 Steve Anderson 593.69 MeelingrTrsintrg Expanse Reimbursement
78718 Dollars E.Bingman 1,064.20 Mealing/7ralning Expense Reimbursement
75719 Mom A.Brawn 120.00 Mee9ngri-ralning Expense Reimbursement
76720 Richard A.Cadlion 503.45 MaelingRmining Expense Reimbursement
75721 Maws D.Dubois 425.43 MeelinglTrslning Expense Reimbursement
76722 James Ferrymen 546.62 MeelinglTmining Expense Reimbursement
78723 James D.Herbeg 245.00 MeelingrTmining Expense Reimbursement
78724 Chuck Hodge 125.00 Meeling/Tmining Expense Reimbursement
78725 Jln H.Kim 564.07 MeelingRrslnllg Expense Reimbursement
78726 Parcels A.Koester 154.00 MeelingVTmintrg Expense Reimbursement
78727 Vladimir A.Kogan 243.62 MeelingRrainirg Expense Reimbursement
78728 Ellzebeth A.Laphe 27.27 Meelingr7ralntrlg Expense Reimbursement
78729 Voided Check - -
78730 Jagadish C.Omganti 102.00 Meelingr7relning Expense Reimbursement
78731 Orange County Bankston District 65.94 Patty Cash Rehnb.
78732 Edward M.Tones 602.20 MeelinglTmining Expense Reimbursement
787M Paula A.Zeller 934.37 Meelingr7minln0 Expense Reimbursement
78734 Orange County Sanitation District 1.012.40 Petty Cash Relmb.
78735 Ramirez Construction,Inc. 3.300.00 Repair&Maintenance Services-Replace&Adjust to Grede(72)Manhole Covers
78736 City of HunBngkn Beach 1.400.00 PermH Fee SP90
78737 Black&Veatch Corporation 55.457.59 Professional Services J-77
H Wpa XCEL.m1 W9WRE4Wms Pat MpadgfieTClaena Pail assort-(Ii EXHIBIT
hwztah Page 7 of 10 3d3rm06
Clot.Paid From 02d)VOIS to 0211=6
Warrant No. Vendor Amount Description
78738 Blue Cross of California 362, NAI Medical Insurance Premium
78738 Bmwn&Coltman 761.804.80 Professional Services P2-90
78740 Della Daniel 58,637.21 Daniel Insurance Plan
78741 El Du Pont De Nemours And Company 148,299.00 Painting Main1.Services MO 4-2248
78742 Kaiser Foundation Health Plan 68.407.82 Medical Insurance Premium
78743 Synod.West,Inc. 103.374.89 Residual.Removal MO 3.29-96
78744 Advance Business Gmphlcs 4,454.01 Printing Services-Year-End Brochure 04/05&Weslehauler Farms
75745 Andes Safety,Inc. 306.15 Safety Supplies
78746 Alhambra Foundry Co.L.T.D. 8.671.72 Manhole Frames&Covers
78747 American Express 24,355.87 Purchasing Card Program.Msc.Supplies&Services
78748 American Industrial Hygiene Association 186.00 Membership
78749 Arch Window 1,156.63 Paging Service-Aid res.Service&Equipment
78760 ASSE 140.00 Membership(American Soc.of Safety Engineers)
78751 American Telephone&Telegraph Cory. 28.02 Telephone Service
78752 Bedle Wens Associates 21,352.48 Professional Services-Sewer Rate Fee Review
78753 Court Trustee 90.89 Wage Garnishment
78754 CHMIA Conf.Registration,do Mary Avastu 200.00 Membership&Training Registration
78755 City of Newport Beach 7,420.60 Miscellaneous Capital Projects
78756 CMAA 85.00 Training Registration(Construction Management Association of America)
78757 Communicators Performance Group.Inc. 12,055.00 Professional Service-Maintenance for lERP&Related Documents
78758 Compressor Components of California 11,830.00 Repairs&Maintenance Se iices-(14)LSVS Engine Gas Injector Ignitors
78759 County of Orange 150.00 Wage Garnishment
73760 County of Orange Auddor Controller 70.00 Encroachment Permit-241414
78761 County of Orange Auditor Controler 140.00 Encroachment Permit-P142
78762 County of Orange Auditor Controller 855.00 Administration Fees-Adjustments to Property TeX Bills
78763 Cummins Alison Corp. 453.16 Accounting Equipment Maim.Agreement
78764 CWEA 2002 Annual Conference 870.00 Training Registration(Cafifomla Water Environment Association)
75765 CWEA Membership 144.00 Membership(Cold.Water Environment Assoc.)
78766 Deride Time Service - 275.00 Tree Mand.Service
78767 Department of ChIM Support Services 300.00 Wage Garnishment
78768 Employee Benefits Specialists.Inc. 10.65323 Reimbursed Prepaid Employee Medical&Dependent Care
78769 Environmental Resource Association 1.416.58 Lab Pads&Supplies
78770 Court Omer 445.00 Wage Garnishment
78771 Fountain Valley Rancho Hand Wash 1.198.99 Vehicle Washing&Waxing Services
78772 Franchise TeX Boom 50.00 Wage Garnishment
78773 Franklin Covey 388.14 Dike Supplies
78774 Gnsyber Elecldc Company 17,733,49 Computer H8mWa191B0&Xram Upgrades
78775 Great Western Southey Supplies 313.94 Janitorial Supplies
78776 Industrial Distribution Group 511.30 Mechanical Pads&Supplies
78777 Insight Investments 1,853.30 Professional Services-Computer Hardward5o8ware-Network
78778 Internal Revenue Service 125.00 Wage Garnishment
78779 Intl.Union of Oper.End.AFI CIO Local 501 4,552.30 Dues Deduction
78780 ITT Standard do Heal Technology 294.13 Mechanical Paris&Supplies
78791 Jamison Engineering Contractors,Inc. 2,469.74 Repair&Melnt.Services-Pipe on Memory Lane PVCP
78752 Keith Sugar 945.00 Training Registration
78783 Kemiron Companies,Inc. 4.061.17 Ferric Chloride
79764 Leeward Shelving&Filing Systems 100.50 Speclansad Filing Supplies-Board Secrelarys Office
78785 Court Order 150.00 Wage Garnishment
n\GepnM1MEXCELUIN3PAPSMRFLIame red RegrmWOMla:ma Pe RepM-pl-ted6 EXHIBITA
rmrstmc Page 8 of 10 mtsnwa
Chime Paid From OV01106 to 02118106
Warrant No. Vendor Amount Description
78786 Lorm en Education Services 578.00 Training Registration
78787 Couri Order 225.00 Wage Garnishment
78788 National Bond 8 Trust 2,622.60 U.S.Savings Bonds Payroll Deduclions
78789 Nextel Communications 2.879.88 Cellular Phones B Air Tima
78700 0 C Tanner Recognition Company 737.03 Employee Service Awards Program
78791 OCS Reprographics 4.291.16 Printing Service-MO V26100
78792 OCEA 604.49 Dues Deduction
78793 Orange County Shedd 85.00 Wage Garnishment
78794 Oxygen Service Company 5,181.23 Leb Pads 8 Supplies
78795 Peace officers Council of CA 1.593.00 Dues Deduction,Supervisors 8 Professionals
78796 RBF Engineers 4,978.66 Engineering Services 7.38 8 241
78797 Rockhursl College Continuing Education 105.00 Planning Division Meeting Registrations
78798 SBC 1.597.16 Telephone Services
78799 SBCIMCI 29.88 Telephone Services
7880D Shureluck Sales&Engineering 80.06 Mechanical Paris 8 Supplies
78801 Court Older 721.50 Wage Gamshmenl
781102 SO Cal Gas Company 13,13055 Natural Gas
78603 Southern California Edison 2,823.24 Power
788N Strategic HR 180.00 Training Registration
78605 Summit Steel 641.36 Metal
79806 Technical Service Group,Inc. 1.381.60 SCADA System VAX Service Agreement
78807 Tetra Tech,Inc. 17,365.42 Professional Services 7.37
78W8 United Way 10.00 Employee Conidbulions
78809 Vemon California 249.80 Telephone Services
78810 The Wackenhut Corporation 4,24,1.33 Security Guards
78811 Walemuse Association 275.00 Training Registration
78812 V hMa Sanitary Supply 59.61 Janitorial Supplies
78513 WEF 144.00 Membership-Wafer Environment Federation
78014 Court Order 597.50 Wage Garnishment
78815 1-000-Conference(R) 269.50 Conference Telephone Cells
78816 30 Instruments L.L.C. 7930 Restocking Fee
78817 County of Orange Audder Controller 720.00 Administration Fees-Adjustments to Property Tax Bills
78818 Jose C.Amber 58.00 MeetingRmildrg Expense Reimbursement
78819 Nicholas J.Amounts 40.00 MeetingRraining Expense Reimbursement
78820 Theme M.Stands 848.59 Meetingrframing Expense Reimbursement
78821 Michael C.Bock 633.42 Meeting7fminba Expense Reimbursement
788U Nancy Cams 5.38 MeetingRraining Expense Reimbursement
78823 Donald R.Cleveland 48.00 Meeling7Training Expense Reimbursement
78324 County of Orange Auditor Controller 915.00 Administration Fees-Adjustments to Property Tax Bills
78525 Robert P.Ghlrelli 600.99 Meeting7frainblp Expense Reimbursement
78826 Ronald J.Hinshaw 158.00 Meeting7Tralning Expense Reimbursement
78827 Charles G.Lee 1.357.45 Meeting7Tmining Expense Reimbursement
78828 Chris Maher 171.76 Meeting/Training Expense Reimbursement
76829 Patrick B.Miles 112.66 Meetingfradning Expense Reimbursement
78830 Darryl G.Miller 021.75 Meeting7Tralning Expense Reimbursement
78831 Joseph W.Park,Jr. 63.00 Meming/Tralning Expense Reimbursement
78832 Daniel R.Trembley 120.00 Meetingrfralnln9 Expense Reimbursement
78833 Charles F.VAr or 609.70 MeetingRmining Expense Reimbursement
H wpMpWXCELddUXAAPswaElcialnn Paw Rapmw6aTclsms Pad ReW-OS15tt EXHIBITA
motel Page 9 of 10 viscous
Claims Paid From OVOI106 to O3/16108
Warrant No. Vendor Amount Deacr[often
78834 County of Orange Auditor Controller 690.00 Administration Fees-Adjustments to Property Tax Bills
78835 County of Orange Auditor Controller 615.00 Administrator,Fees-Adjustments to Property Tex Bills
78836 County of Orange Auditor Controller 840.00 Administration Fees-Adjustments to Property Tex Bills
78837 County of Orange Auditor Controller 720.00 Administration Fees-Adjustments to Property Tax Bills
78838 County of Orange Auditor Controller 855.00 Administration Fees-Adjustments to Property Tex Bills
78839 County of Orange Auditor Conbo0er 780.00 Administration Fees-Adjustments to Property Tax Bills
78840 Employment Development Dept 1.350.00 State Unemployment Tax
78841 BARBS 125.00 Training Registration
78842 So Cal Gas Company 6.916.02 Natural Gas
Total Accounta Payable-Warrants S 16,420241.32
Payroll Disbursements
32574 - 32661 Employee Paychecks S 144,507.80 Shvsekry Payroll 02/01/2006
32662 - 32664 Employee Paychecks 1,283.53 Retro,IDEA 8 Termination Payroll 02M2M6
32665 - 33667 Employee Paychecks 48,538.75 Retirement Payroll 02/02/06
32668 - 32771 Employee Paycheck 156.303.73 Biweekly Payroll02/15/06
121742 -122853 Direct Deposit Statements 2,221.UB.14 Direct Depose Statements 02MI106&02H5M6
Total Payroll Disbursements S 2,572,181.95
Who Transfer Pavmenb
OCERS S 11,309,975.00 Advanced Employer Paid Premium for FY 05/08(OW IM6)'
OCSD Payroll Taxes 8 Contributions 1.395.659.15 Shyeekly Payr0ll 02101MO 8 0W15M
Societe Generale 53,963.77 Series 1993 Refunding COP's Standby Leger of Credit Commission(Olul-01/31106)
Lloyd's TSB Bank pic 63,115.40 Series 1992 COP Standby Purchase Agreement Comm.Fee(11/01105-O2A118)6)
JP Morgan Chase Bank 137,857.79 Series 1993 Refunding COPe January Interest Payment
Chase Manhattan Bank 66,582A8 Series 2000 Refunding COPS Burnaby Purchase Agi,Comm.Fee(11/1/05.01131/05)
Total Wire Transfer Payments S 13.027.153.59
-aa r,Ppnoe en tnuoa upon.
Total Claim Paid 02101m8-02116N8 8 ]2.019.5]8.88
R%dapvnExcEI ENVlpAPSRARE%Clnma Poo RoponvX4)M :mr Pale Rapm-Yz1546 EXHIBITA
uorztwc Page 10 of 10 wtarmpe
Claims Paid From 02118/06 to 0=811116
Warrant No. Vendor Amount Description
Accounts Payable-Wamnla
78843 Bar Tech Telecom,Inc. S 42,113.13 Telephone Maintenance
78844 Black&Vealch Corporation 734,248.75 Engineering Services Pt-76&P1-102
78645 City of Huntington Beach 533,969.71 Cooperative Projects Program
78M Camp Dresser&Mckee,Inc. 75682.60 Engineering Service J-71-8
78847 Dudek&Associates,Inc. 75,178.7E Professional Services P268
73MB HeWe8 Packard Company 74,N8.62 Coeperetive Agreement-Server PCs&Notebooks
78849 Innedine Engineering 31,6n.15 Video Inspections of Severine Segments for Damage,infiltration&Illegal Connections
78850 harms Companies,ft. 115.307.51 Ferric Chloride
78851 MWH Americas,Inc. 46,070.43 Professional Svvices J-101
76852 Nagonal Plant Services,Inc. 26.978.88 Vacuum Truck Services
78853 Orange County Water District 6,477,862.58 Joint GWRS Project J-36
78854 Pioneer Americas,Inc. 182,513.71 Sodium Hypochlmtte
78855 Patydyne.Im% 2&03&21 Caloric Polymer MO 3-11.92
78856 Synagro West,Ine. 160,030.26 Residuals Removal MO 349-95
78857 Tine Ranch fvlagan Forum 212,157.41 Residuals Removal MO 3.29-95
78858 UBS Financial Services.Inc. 26,306.88 Remarketing Fee-1992 Series Advanced Refunding COPS
78859 US Peroxide.L.L.C. 154,021.51 Odor&Corrosion Control Treatment for Coll.Sys.;Hydrogen Peroxide&Ferrous CMorde
78860 ARB,Ina 490,057.20 Construction 7-36
78861 Dalke&Soria Constructions,Inc. 130,670.18 Construction P266-2&J-tie
78862 Denbaer Engineering&Construction 184,096.00 Construction P266-3
78863 Fleming Environmental,Inc. 38,292.75 Construction FEU5-29
78864 Mev41 Pacific Co. 1,086,915.60 Construction Slat&562
78865 Mike Pdich&Sons 159,066.00 Construction FEOS-20
78865 Sancon Engineering,Inc. 32,058.OD Construcgon 7-21
78867 Union Bank of California 54,450.80 Construction 7-36,Retention
78868 Wells Fargo Bank Mac C7300612 120,768.40 Construction 542,Retention
78869 West Star Environmental,Mc. 90,000.00 Construction FE05-30
78870 Absolute Standards.Inc. 98.00 Lab Pads&Supplies
78871 Acgnstandard 528.62 Lab Pads&Supplies
78872 Advance Business Graphics 2,039.74 Stationery&Office Supplies
78873 Air Liquids America Corporation 193.97 Specialty Gases
78874 Aigas Safety,Inc. 578.90 Safety Supplies
78875 AM Consulting Engineers 13,500.00 Professional Services-Pad-Time Dig Afed Technician
78876 American Aldines 2,439.70 Travel Services
78877 American Public Works Association 582.00 Nogces&Ads
78878 American Rod Cress 145.30 CPR Training&Miscellaneous Supplies
78879 Amtech Elevator Services 1,400.00 Monthly Elevator Maintenance at Pits.1&2
78880 Applied Industrial Technology 65.83 Mechanical Parts,&Supplies
78881 Aquarium Doctor 110.83 Human Resources Aquarium Service
788M Archie Ivy,Inc. 4.673.00 Street Repairs
78883 Arles Industries,Inc. 507A7 CCTV Cable
78534 ATCC 219.20 Lab Parts&Supplies
78886 AWSI 216.00 Department of Transpodalian Program Management&Testing
788W Basic Chemical Solutions,L.L.C. 12.610.70 Sodium Bisulfite
78887 BC Wire Rape&Rigging 37.72 Mechanical Pans&Supplies
78888 BEC Build"Electronic Controls.hm. 3.450.00 Fire Alm.System Maintenance&Testing
788N Bee Man Pest Control,Inc. 150.00 Pest Control
78890 BloMerieux Vnlsk,Inc. 672.63 Lab Pads&Supplies
78891 Blue Martin Group 798.14 Repair&Maintenance Services-Nadine
HAd,mx*XCELWQV PS141R[NUdaf Paid RepwPA60MUrns Paid Faxon-eb2846 EXHIBITS
5d2nxi Page 1 of 5 vfs000e
Claims Paid From OL1 WOO W OV28MS
Warrant N. Vendor Am0sd Description
78892 Buclmam&Associates,Inc. 1,190.00 Professional Services-Pavement Management
78893 California Auto Collision 631.56 Auto Body Repair-V422
78894 California Dept.of Health Services 225.00 Lead Certification Renewal
78895 Calfronia Landscaping and Sprinkler 750.00 Groundskeeping
78896 California Relocation Services,Inc. 281.25 Office Files MovinglRelOcati0n Services
78897 Camfil Farr Sales 423.73 Electrical Pads&Supplies
78896 Cardlock Fuel Systems,Inc. 16.752.88 Fuel Card Program-District Vehicles&Monitoring Vessel
78899 Careers In Government,Inc. 1.200.00 Notices&Ads
7SWO Cad Warren&Co. 300.00 Inumance Claims Administrator
78901 COW Government,Inc. 1.412.67 Computer Hardware/Snfiware
78902 Cinguter Wmiess A mime 5,802.75 Wreless Services
78903 City of Ne"ral Beach 1.200.00 Annual Mooring Fee-Names
789N CMAA 120.00 Membership
78905 Coast Fire Equipment 249.18 Fire Extinguishers
78906 Cooper Cameron Corporation 4.874.83 Pump Repairs
78907 Corporate Express 7,959.24 Office Supplies
78908 CS-AMSCO 3.276.18 Mechanical Pads&Supplies
78909 CSUF FOundatlon 11,369.50 Membership-Center for Demographic Research
78910 Culligan of Orange County 44.05 Maim.Agreement-Can Gen Water Softener System
78911 CWEA 2006 Annual Conference 790.00 Training Registration(California Water Environment Associabon)
78912 CWEA Membership 100.00 Membership(Cald.Water Environment Assoc.)
78913 Davis Instruments 780.00 Instrument Parts&Supplies
78914 DOB Engineering,11 1.500.00 Professional Services-Grant Management
78915 DHL Express USA,Inc. 15.16 Freight Services
78915 Dwyer Instruments,Inc. 443.11 Instrument Paris&Supplies
78917 E.Sam Jones Distributors,Inc. 59.25 Electrical Paris&Supplies
78918 Edinger Medical Group,Inc. 205.00 Medical Screenings
78919 Electra-Bond,Inc. 4,308.35 Repairs&Maintenance Services
7a920 Electrical Reliability Services 940.00 Professional Services J-77
78921 Employee Benefits Specialists,Inc. 666.75 Reimbursed Prepaid Employee Medical&Dependent Care
78922 Enchanter,Inc, 4.260.00 Ocean Monitoring&Outfall Inspection&Maintenance
78923 Environmental Microbiology Consulting 720.00 Professional Services J-102
78924 Ewing Irrigation Industrial 486.42 Landscape Irrigation Pads&Supplies
78925 Fedex Corporation 271.68 Freight Services
789M Ferguson Enterprises,Inc. 1.404.20 Valves
78927 First American Real Estate Solutions 450.00 OnUne Orange County Property Information
78928 Fisher Scientific Company,LL.C. 10.796.06 Lab Pads&Supplies
78929 Fo0dcraff Coffee&Refreshment Smlces 231.50 Meeting Supplies
78M FfanMin Covey 65.30 Office Supplies
78931 Gales Fiberglass Installers 221.55 Fiberglass Repair
78932 GE Infrastructure Sensing 2,100.00 Repairs&Calibration Service-Transmitter
76933 General Binding Corporation 47.01 Lab Pads&Supplies
78934 Geomaldx Consultants,Inc. 12,870.00 Soils,Concrete&Other Materials Testing
78935 George T.Hell 307.89 Actuator
78936 Golden Bell Products 9,223.50 Contractual Services-Insecticide Coating of Manholes
78937 Goldenwesl Window Service 960.00 Plant Groundskeeping Services
78938 Grainger.Inc. 679.63 Mechanical Pads,Supplies&Batteries
78939 Great Western Sanitary Supplies 266.10 Janitorial Supplies
78940 Guarantee Records Management 263.02 01 Records Storage
78941 Chet&Kristen Hein 598.35 User Fee Refund Regarding Septic Tanis
HfApMME%GEL.matEtWPSHPREK'YNu PaW RepvTaaaTClanu Paid!Repvn-0$-28116 EXHIBIT S
Hv7Ii Page 2 of 5 v137006
Claims Paid From 02110MG to 02128100
Warrant No. Vendor Amount Description
78942 Hach do Ponton Induslde9 869.76 Lab Pads&Supplies
78943 Harold Primness ess Ice 60.00 Ica For Samples
789H Hill Brothers 17,764.66 Chemicals-Dow&Corrosion Control-Newport Trunkline
78NS Home Depot 175.28 Misc.Repair&Maintenance Material
78948 Hopkins Technical Products 1,603.38 Mechanical Pads&Supplies
76947 Hub Auto Supply 963.37 Vehicle Paris&Supplies
76948 IDEKX Laboratories.Inc. 4,266.00 Lob Paris&Supplies
78949 Industrial Distribution Group 609.06 Mechanical Paris.Supplies&Tools
78950 Industrial Threaded Products,Inc. 40.80 Mechanical Pads&Supplies
78951 Ionics Instrument Deftness Group 702.28 Lob Pads&Supplies
78952 handled Pads It Supplies 1,641.49 Air Fillers
78953 J&L Industrial Supply 881.12 Tools
78954 Joys Catering 2.035.02 Meeting Expenses
78955 Johnstone Supply 92.51 Electrical Pads&Supplies
78955 KWnfelder.Inc. 339.00 Soils.Concrete&Other Malerials Testing
78957 Lancaster Laboratories,Ine. 1,050.00 Lob Analyses
78958 LINJER 5.528.25 Professional Service-DART NO 9.22.99
78959 Landon Bridge Trading Co..Lid. 2.026.48 Safety Supplier
78960 Luccfs Gourmet Foods,Inc. 169.80 Meeting Expense
78961 Managed Health Ne"rk 1.050.72 Employees Assistance Program
78962 Marine Technology Network Association 75.00 Membership
78963 Marketing Group Busnless Solutions,Inc. 105.40 Lab Pads&Supplies
78964 MassMutual Michel Financial Group 145.41 Execullve Disability Plan Premium
78965 McMaster Can Supply Co. 725.76 Mechanical Pads&Supplies
78966 Medlin Controls Co. 2.717.79 Instrument Pens&Supplies
78967 Midway Mfg.&Machining Co. 3.190.00 Mechanical Pans&Supplies&Maintenance Services
78968 Miele,Inc. 223.95 Lab Pads&Supplies
78959 Mission Abreslwd If Janitorial Supplies 191.91 Safety Supplies
78970 National Fire Protection Association 572.24 Membership and Publications
78971 NORLAS 145.14 Chemicals
78972 Nu Way Laser Engraving 343.78 Asset Tags
78973 ODE Reprographics 1,048.84 Printing Service-MO 1128100
78974 Of m Depot Business SeMces ON. 3,856.87 Office Supplies
78975 OhmadNEGA Corp. 3,856.81 Electrical Pads&Supplies
78976 Cresource Distributors,Inc. 969,45 Electrical Pads&Supplies
78977 Orange County Pest Control.Inc. 50.00 Peal Control
78978 Orange Fluid System Technologies,Inc. 999.51 Mechanical Paris&Hose Supplies
78979 Oslerbauer Compressor 2,022.07 Mechanical Pads&Supplies
78980 Oxygen Service Company 1,196.88 Lab Pads&Supplies
78981 Pacific Mechanical Supply 1.019.21 Plumbing Supplies
78982 PCS Express,Inc. 27.98 Corder Senn.
78983 Pod Supply 21.32 Mainlenance Supplies&Hardware-Nelson,
78084 Process Equipment Company 295.18 Pump Supplies
78985 Hoffman Southwest Corporation 11.131.2a Se rllne Cleaning-City of Tuslin&Unincorporated County Property
78986 Prudential Overall Supply 1.481.05 Uniforms&Related Adicles
78987 Quartermaster Incorporated ismia Salary Supplies
78988 Rarrey,Industries 4.540.00 Repair&Maintenance Services-Bell Press Filter Tray
78080 Red Wing Shoes 223.67 Solely Shoes
78990 peaks Corp. 203.20 Lob Pans&Supplies
76991 RMS Engineering&Design,Inc. 1,400.00 Engineering Services P2.06-3
H WepMmE%CfLEleQ1oW5HPRfWltlmr Peld fr,. Minh-Pair aepoe-02@aaa EXHIBITS
mamas Page 3 of 5 o IMM
Claims Paid From DL18/g6 W 02128AI6
Warrant No. Vendor Amount Description
78992 RPM Electric Molem 3,19054 Motor Repairs
78993 South Coast Environmental Co. 2,990.61 Air Quality Mandoring-Pit.2 Boiler Source Testing
78994 SOP Science 227.00 Lab Parts&Supplies
78995 Seavenbnee 2,210.59 Ocean Monitoring
78996 Shamrock Supply Co..Inc. 439.41 Hardware
78997 Snall Infrared 11.400.00 Training Registration
78998 Society of Em.Toxicology&Chemistry 160.00 Membership
78999 Scultem Counties Wbdcents 4.210.74 Motor Oil
79000 Spectrum Vix1ee,Inc. 2.036.25 Professional Services J-84
79001 Spez Certiprep,Inc. 602.21 Lab Pads&Supplies
790D2 Summit Steel 515.71 Metal
790D3 Sunset Industrial Pads 94329 Mechanical Parts&Supplies
7900a SWRCBAccounOng Office 264.00 Annual Fee-Stonm Water Permit Gisler-Redhill&Orange Trunk Sewers
79DD5 TCH Associates,Inc. 2.888.66 Lab Parts&Supplies
79D06 Teledyne Analytical 195.W Battery
79007 Terminix International 224.00 Pest Control
79D08 The Orange County Register 3.382.34 Notices&Ads
79009 The Walking Man,Inc. 400A0 Public Notice PnMing&Mailing Services Various Projects 7-36
79010 Thomas Gray&Assoc. 330.00 Radioactivity Wine Tests&Lab Analyses
79011 Thompson Industrial Suppy,Inc. 420.35 Grease
79012 Daily Pilot 260.25 Notices&Ads
79013 TMV System Engineering,Inc. 5,437.50 Sellware Maintenance
79014 Todd Painting,Inc. 3.395.00 Painting Services
79015 Tomys Look&Safe Service&Sales 21.55 Locks&Keys
79016 UC Regents 150.00 Training Registration
M17 UC Riverside 6,481A4 Professional Services-Strategic Process Study Research Project
79018 Ultra Scientific 427.04 Lab Parts&Supplies
M19 Underground Electric Supply 3,626.00 Electrical Repair&Maintenance Services
79020 United Parcel Service 2.164.62 Parcel Services
79021 US Cost,Inc. 9.987.00 Estimating Soflwere
79022 Valco Instrument Co..Inc. 233A4 Lab Pads&Supplies
79023 Village Nurseries 18.96 Landscaping Supplies
79024 Vision Service Pan CA 9.924.60 Vision Service Premium
79025 Vertex Corp. 2.100.25 Repair&Maintenance Services-Roll-Up Doors at Pit.1&Entrance Gale at Po.2
79026 Vossler&Co. 604.24 Mechanical Parts&Supplies
79027 V1x/R Scientific Products Corporation 1.755.11 Lab Parts&Supplies
79028 Waxy Sanitary Supply 310.10 Janitorial Supplies
79029 West Lile Supply Company,Inc. 634.12 Etectiicel Parts&Supplies
7903D WaddaMark 220A0 Membership
79031 Xerox Corporation 546A3 Paper
790K Marian M.Alter 35.68 MeetingRraining Expense Reimbursement
T9033 Layne T.Ban i 253.10 MeetingRraining Expense Reimbursement
79D34 Michael Bowler 1A00.00 Employee Computer Loan Program
M35 Mark A.Esquer 63.00 Meeting/Training Expense Reimbursement
79036 Victoria L.Francis 753.05 Meeting/Training Expense Reimbursement
79037 Robert Gaggle 558.79 Meeting/Training Expense Reimbursement
79038 Maria G.Jimenez 33.38 MeetingRraining Expense Reimbursement
79039 Pamela A.Koester 42.00 MeetingRraining Expense Reimbursement
79040 William F.Pierce 96.00 Meeting/Training Expense Reimbursement
79041 Roy J.Reynolds 120.68 Meeling/Traming Expense Reimbursement
HMepaPME%CELE1a1230NPanWRE�LIWu Pax RtympOaOMAalmc No Repot-02 3 EXHIBIT B
ervltax Page 4 of 5 yna2ms
r s
Claims Paid From OL18/08 to OW28106
Womerd No. Vendor Amount Description
1r%f42 Mallon Roche 618.68 Meeting/Training Expense Reimbursement
7OD43 Curt V.Shelp 767.59 Meeting7Tralning Expense Reimbursement
79044 Stele Board of Equalization 500.00 Annexation Fee
79045 Use L.Tomko 1,359.06 Meetingf7raining Expense Reimbursement
79046 Paula A.Zeller 586.08 Meeting/Training Expense Reimbursement
79047 Slate Board of Equalization 300.00 Annexation Fee
79048 Southern California Edison 30,808.00 Poner
79049 Science Applications lnlematlenal 22.935.13 Ocean Monitoring NO 6-8-94
Total Accounts Payable-Warrants 8 11,774,644.13
Payroll Disbursements
32772 - 3277B Employee Paychecks 8 1,903.65 Interim Replacement,Ratio It IDEA Paychecks 02/18106
32777 - 32780 Employee Paychecks 16,252.83 Interim Retirement&Termination Paychecks
Total Payroll Disbursements 8 18,166.48
Who Transfer Payments
US Bank 453.355.56 Series 2000 A&B Refunding COPS February Interest Payment
Total Wire Transfer Payments S 453,355.56
Total Claims Paid 02116106-DW28106 $ 12,248,188.17
H 6,Wm xCEL.4fM2 P61WIEkOelms Pat Rep 0&0] 1Mrn Pro RepW-02-2046 EXHIBIT
nnalmk Page 5 or 5 mlae0re
BOARD OF DIRECTORS Meeting Date TOed.orDlr.
03/Zl 06
AGENDA REPORT Item Number Item Number
9(a)
Orange County Sanitation District
cellectloas
Facilities
FROM: David Ludwin, Director of Engineering
Originator: Bob Chenowith, Senior Engineering Associate
SUBJECT: PROPOSED ANNEXATION NO. OCSD-55—BOLSA CHICA
ANNEXATION
GENERAL MANAGER'S RECOMMENDATION
(1) Receive and file petition from Hearthside Homes requesting annexation of 71.24
acres to Orange County Sanitation District in the vicinity of Boise Chica Street and Los
Patos Avenue, an unincorporated area in Orange County; and (2)Adopt Resolution No.
OCSD 06-04 authorizing initiation of proceedings to annex said territory to OCSD
(Proposed Annexation No. OCSD-55—Boise Chico Annexation).
SUMMARY
• The Orange County Sanitation District (Sanitation District) received a request from
Edward Mountford with Hearthside Homes to annex 71.24 acres to the Sanitation
District. Hearthside Homes will build approximately 349 residential homes in the
Brightwater Development.
• Hearthside Homes will build an eight-inch public sewer in the City of Huntington
Beach (City)that will connect to an existing Sanitation District sewer manhole on Los
Patos Avenue. The City will be the local service provider and will also be the
applicant for the Sanitation District connection permit.
• Brightwater Development will be annexed to the City. The Sanitation District will
collect the Capital Facilities connection charges for the 349 residential units to be
built, minus the initial annexation deposit of$750,000 paid in 1991, for the Boise
Chica property.
PROJECT/CONTRACT COST SUMMARY
This annexation is in accordance with the terms of the negotiated agreement with the
County of Orange regarding A.B.8 Tax Exchange for annexing properties. The Board of
Directors approved this action and it became effective March 14, 1989. Under this Tax
Exchange, OCSD does not receive a percentage of the basic levy, and instead, collects
a higher annexation fee. The fee of$761,333.70 includes the following:
OCSD Annexation Acreage Fee based on 71.24 acres @ $4,235 per acre $ 302,463.70
OCSD Capital Facilities Connection Charges— (349 homes) 1,208,370.00
OCSD Processing Fee 500.00
Credit for initial payments already collected per 1991 OCSD agreement (750,000.00)
TOTAL ANNEXATION FEE $ 761,333.70
PRIOR COMMITTEEIBOARD ACTIONS '
i
Approval of a Sewer Service Agreement between Signal Balsa Corporation and the
Sanitation District by the Board of Directors at its regular meeting on November 13,
1991.
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
The Sanitation District entered into a Sewer Service Agreement with Signal Balsa
Corporation an affiliate of Hearthside Homes in November 1991. The agreement was
for future annexation and a future sewer connection to an existing Sanitation District
sewer manhole for the Boise Chica area development.
The agreement required an initial payment of$250,000 plus future payments of
$500,000 due when the Slater Pump Station was complete. The $750,000 prepayment
amount already received was based on 10% of the pump station project cost for the
future development sewer flows.
The Annexation fees for the 71.24 acres, per Ordinance OCSD No. 21, are $4,235 per
acre totaling $302,463.70. The estimated OCSD Capital Facilities Connection Charges
for the development of$1,208,370 is based on the number of bedrooms for each of the
349 homes, per Ordinance OCSD No. 26. The actual OCSD Capital Facilities
Connection Charges will be determined at the time the connection permits are issued
based on the final City approved housing plans.
ALTERNATIVES
None
CEQA FINDINGS
CEQA has been filed and approved by the City.
ATTACHMENTS
Map and Legal Description
RLC:sa
WntglobaMgenda Draft ReponsVoint Boards\Bolsa Chica Annex AR 032206.doc
aemsee: Komi Page 2
EXHIBIT NBx
BOLSA CEDCAANNEXATION OCSD-56 RO 06-60
TO THE ORANGE COUNTY SANITATION DISTRICT
r A LEGEND
R e F r' • • OIS1Nr1�mjpYl.�'rt sYluna
E ..,Im MEMM'
I
.....Lw Z4104p NIS a XATIa =WNJ 71.24 APES «-
5734
40-42 1Y1xIs i1[r°"IozoJ1po IR°E�lINn. TTo b1
s11fCTx osru. rlE 010 o1s"Im:°.SF a TE
N PSSEu®DINAR STEM.. IIXS@3I
I ' I J°E 11 M IAJ 11991o5 F G.C.S.
OJ N MIWMI. ILL11N.T MMM DIVA
GLL s14 WS ID.F[m a. 0.5599nw.
�R991--IW 8. 09 3` YM1 Moils-JI. 11°x11J�1 l°G
[YMlm to NEP.I® W IE d MEN n WEER V °p
svR1I9IZEa
sx�J
n[Iff1EKS [VIHS 12/31gws q�p CAS'G
NIS F40MA. GOES MET ME YI . 6 1M
WANE [IINIrr S .af ETTIM.
I IHSi P.JHEH: H6. MOSrYJJ9lp9)Y �d0o� [. sA11E. mrrt sxv[.a 'fp E°IG yp
. wss. n[t6NSE [e•14s w/J1/!R'6 p .,p AO
N as Eh6m
T ' �s
- m INDEX MAP *Wlu
or csI o' soo• eoo'
SVIffT1 OFs
O E-SS.d,. Inp64)SE1:I425VM
'�sy{.� LNTN.i�al ns�iaL'1 R n i - � 1�6� 0�R�1MICr R o
w wens - -
I yam
N .M• ne-lie-a Ewsm x
TLN L„
M. O' ]00' 400' LM L il•
% LSD
Y tl
ul Ls us ,. S
1 )1 • YRl.iq R 1 PYOlV
10 L.1
O1.1Q COpMI ]4nl.ilA /yam LM
GIs., R II ai R N-MtN L%
"fGb L%
O S ft iT.-n aSIaCT m [I
W 11
as R a-e$-n d La LN
La La
LEGEND ��� � �l RT LM
In M161NxEMi R]fa .13
` ulsna m.I¢ m.n. srmnu ��j
Nsmlcr fo3oMT
a THE
.�[YTIOI OOICWT L. a53'0 LLGi LW.N aY111G Lf1N11 la. OLNIM LLxO1i
L. NYSJ'011 M.M' LM ai•M'Ot1 !S.]]' LI] a,•!1'Yl N.el' LA LM
LSI 311•}I'SO-1 Y..! L% al•42051'x N.N' N9 M6•.S']61 13.]S'
LII 5,1•}I'ZOII N.N' L% 10f•!f'.0.11 31.3)' LM xM•Y'N'x N.%'
FY.HBrr"Bn L23 M9•!S'5SN M.3J• L]T slP:r•08Y ef.}I• ul Ma•Irn'1 N.M• IS, 1}! IE
L/ua 1l LS. MIYI'OPP 36.O ' LM NY39'4!'ll %.a' LY a,Yi'.1'x N.01' p]
]W1 CIDCA�N IXPII'N PO M9 M x -40.111 SI...• LJf WST•.T•f .r.M' LM x%•%'Y'f M.N•
TO 11ffi OIIANp6 C0UNIYBANI'1'.,'1'ION D,BfNGT La MYI341$0x Y.IS' L40 MI42440 N T].Y' LN al•16•!11 N..f•
L}l xava•}.•} Nsr w xM•aa'N•. N.ar L% xN•u•N•f N.N'
mar L.3 MS•.s'SI•x Y.N. LM W03'M'x 33- Yl
LM W'WMN %.Tl' L.J M-01-UN Y.N' L]T a9'}f",]Y ]).6Y
O L% .'M'%ti N.TI' N. xa•01'%T Y.01' LM M.•O]'}J•x .S.N' a�Ion W
N Ii 1� xr�P� Lll nn•N'3.1 S}).])' L.S a6•SI'.Oti N.M' LSf M]•M'.31 N.N' IalaxFYT al. SONOV11Nl �
A� tII x!e•M',11 11.1]' L.L Ma•O'.]l M.a' Lb 113a•M'%l )f.a• a. aNlla L[xaT
�rP'OH� mN xfl Y�L®tlL 0,.—. L31 xWN'YY %.Tl' Nl M]•10'%1 .O.N' L61 WW'NE 16.%• L61 Wa'N'F 11.9]'
•W $ME£!$pF9
OC�SRdpl 1/I&'V.H 1:18]0 PM
• e
"Is IS e
tM' 1 x a 5 e I¢. eFMlm Siiw IT Ip K.I. I"woet
w5e'r ' ' • ?8 LI u]•n A+ im.110 in•1211J.,
e T'I5 MfYlp Ip N •� lZ 1 L} x]•M'}11 1}].m' y'OS•ILJ FP3e•16l y. 5' }I'Al/1e IIppip N STPJI'Inl M.SI• 31'Ati]Y}uip 061OL114 o u WI•ar}IY "35' ' '551Ri Oyi-0 Ln SWAS-0} 5J.J0' •}l•mYLI .u•1111 mnT a•n11Le Sms•A1 loofa• u•121a LS SH•ee•n1 lu.A' eD"N1LIO Sa•A'161 ]5.]T' x'a1
L11 SIYIS'151 el.]]'
r 0e 1'FI 113 yV31-ml x.N'
"• U. xnfm•e11 N.II'
.� 1'•yi L15 x]•59' IV
L}f un xT•u 1}1 Is Ns'
uT MV.. 1 u.x•
l9aiy on LIS Nln•59•m1 m.u•
33
200 o' 200' 100• xv pSAKi M p 1[s M.x-u1
• LI. Y Tw M. N TO mY(E
( ,51g1/.11a WMV M. p
RS.6641241
LI eN1xIIN}q 6 i0 tlNlx
IFM ne<I]-a l l S IAV.DaITMI p 11
lvs xsysn
uw 1m-51s-a1
u LEGEND
l LI( LI j
p¢TpyJR 1p}lepflx}} L9 1 ]IISIIm WYQ LyR SYIr1r10
DISA1Lr m]LINr
LIS LN Le S I MI T 6 ImTDM yLM IKL'1r1A mdRT
LIS YI L L6 L6
L
u
L:T Lr EXHIBIT"B"
B ILI&Kf llG�ONOLEII-56 SOxm
LM L¢ LD NSHN OBAN06 WIIN'1Y 9ANITNTIONOAfA1LT
LIS, LW LI} Lv
FY a oq
INa'Rf/YE� NO. Z+A^11004)MIY 00 `� o `�yQ p ipplplar
d( C1
FORT�iC p1M ply
( CGI eWG.WAfA MYI p1YwYP
SIQ}1]OFJ
OF4od5.Epn 1/16140061:1550 Pet
EXHIBIT "A"
Bolsa Chica Annexation OCSD-55 RO 05-60
to the Orange County Sanitation District
I A parcel of land located in the Unincorporated Territory of the County of Orange,State
2 of California, being portions of Section 28 and Section 29, Township 5 South, Range 11
3 West, more particularly described as follows:
4 Beginning at an angle point in the existing boundary of the Orange County Sanitation
5 District, as established by Annexation no.15, Certified by the Secretary of State by
6 Resolution No. 72-5-11; said angle point being the northerly terminus of that certain
7 course described as "N34'02'21" W 604.70 feet", a tie to said point bears North
8 77°29'52" East, 1954.40 feet from Orange County Horizontal Control Station GPS
9 0085, having a coordinate value (U.S. Survey foot) of North 2206819.933 and East
10 6014382.725, based upon the California Coordinate System (CCS 83), Zone VI, 1983
11 NAD (1991.35 epoch OCS GPS Adjustment), as said monument is shown on Record of
12 Survey 97-1000 recorded in Book 169, Pages 25 to 36 of Record of Survey, Records of
13 Orange County.
14
15 THENCE along the existing boundary of the Orange County Sanitation District as
16 created by said Annexation no.15, through various courses in a general southeasterly,
17 easterly directions to a point on that certain course shown as S89°58'1 T W 773.00' said
18 point being 327.07' from the southwesterly terminus of said course, said point also
19 being an intersection with the westerly line of that certain portion of land described in a
20 Grant Deed recorded in book 4960 page 87, Official Records of said County of Orange.
21 THENCE leaving said existing boundary of the Orange County Sanitation District and
22 continuing S00°10'29"W 555.38' along said westerly line to the northeasterly terminus of
23 that certain course shown as S55'55'23"W 109.74' on the northerly line of An
24 Irrevocable Offer of Dedication to the State of California, recorded December 5, 2005
25 as Instrument No. 2005-00970073 of Official Records.
Page I of 6
EXHIBIT "A"
Boise Chios Annexation OCSD-55 RO 05-60
to the Orange County Sanitation District
1 THENCE leaving said existing westerly line and continuing along said northerly line the
2 following courses: South 55'55'23"West 109.74 feet;
3 THENCE South 55'49'21"West 127.09 feet;
4 THENCE South 44'24'16"West 82.15 feet;
5 THENCE South 73'47'1 8"West 29.41 feet;
6 THENCE South 61'37'27"West 60.35 feet;
7 THENCE South 62"2542"West 53.70 feet;
8 THENCE South 62'41'17"West 50.15 feet;
9 THENCE South 72'35'28"West 100.45 feet;
]0 THENCE South 55'44'37"West 114.79 feet;
11 THENCE South 49'22'16"West 39.37 feet;
12 THENCE South 70'15'15"West 41.57 feet;
13 THENCE South 88'31'08"West 17.51 feet;
14 THENCE North 89'31'28"West 66.14 feet;
15 THENCE South 88'05'41"West 55.11 feet;
16 THENCE South 83'39'51"West 31.84 feet;
17 THENCE South 67"55'12"West 18.88 feet;
18 THENCE South 68'56'57"West 52.58 feet;
19 THENCE North 86'59'00" West 50.59 feet;
20 THENCE North 75"24'12"West 53.32 feet;
21 THENCE North 82'53'05"West 51.28 feet;
22 THENCE South 71'21'20"West 52.46 feet;
23 THENCE South 71"21'20"West 69.49 feet;
24 THENCE North 79'52'55"West 58.33 feet;
25 THENCE North 61'27'07" West 46.07 feet;
Page 2 of 6
EXHIBIT "A"
Balsa Chica Annexation OCSD-55 RO 05-60
to the Orange County Sanitation District
1 THENCE North 69'40'1 7"West 81.44 feet;
2 THENCE North 70'13'12"West 82.15 feet;
3 THENCE North 65'40'24"West 65.61 feet;
4 THENCE North 42'28'44"West 56.43 feet;
5 THENCE North 00'59'06"West 56.77 feet;
6 THENCE North 06'51'35" West 63.77 feet;
7 THENCE North 26'39'54"West 223.33 feet;
8 THENCE North 28'36'51"West 11.33 feet;
9 THENCE North 30'07'51"West 30.77 feet;
10 THENCE North 52'20'02"West 54.33 feet;
11 THENCE North 67'42'57"West 54.44 feet;
12 THENCE North 89'59'40" West 57.23 feet;
13 THENCE South 80'24'06" West 89.21 feet;
14 THENCE South 89'29'48"West 38.89 feet;
15 THENCE North 60'57'47" West 42.04 feet;
16 THENCE North 41`24'03" West 73.54 feet;
17 THENCE North 56'55'08"West 60.01 feet;
18 THENCE North 65'45'31" West 52.06 feet;
19 THENCE North 81'57'37" West 52.88 feet;
20 THENCE North 89'07'36" West 62.01 feet;
21 THENCE North 86'21'40" West 69.25 feet;
22 THENCE North 86'43'43" West 56.26 feet;
23 THENCE North 78'10'38" West 40.65 feet;
24 THENCE North 54.51'52" West 68.81 feet;
25 THENCE North 46'45'26"West 75.55 feet;
Page 3 of 6
EXHIBIT "A"
Bolsa Chica Annexation OCSD-55 RO 05.60
to the Orange County Sanitation District
1 THENCE North 35'52'55"West 62.38 feet;
2 THENCE North 46°17'27"West 83.58 feet;
3 THENCE North 51'46'41"West 64.01 feet;
4 THENCE North 55"55'52"West 64.00 feet;
5 THENCE North 61'16'51"West 60.49 feet;
6 THENCE North 63*11'08"West 68.02 feet;
7 THENCE North 60'09'04" West 64.11 feet;
8 THENCE North 59'29'13"West 33.61 feet;
9 THENCE North 44°03'25" West 45.80 feet;
10 THENCE North 43°39'48"West 64.06 feet;
11 THENCE North 35°50'56" West 39.41 feet;
12 THENCE North 34°55'24 West 326.74 feet;
13 THENCE North 00°00'00" East 76.30 feet (75.93 feet per said Irrevocable Offer of
14 Dedication) to the most northeasterly comer of said Irrevocable Offer of Dedication, said
15 point also being on the existing boundary of the Orange County Sanitation District as
16 established by Annexation no. 7 Parcel "D", Certified by the Secretary of State by
17 Resolution No. 63-1634;
18 THENCE leaving the boundary of said Irrevocable Offer of Dedication, and continuing
19 easterly along said existing Orange County Sanitation District boundary as established
20 by Annexation no. 7, Certified by the Secretary of State by Resolution No. 63-1634 and
21 Annexation no. 14, Certified by the Secretary of State by Resolution No. 66-152-11, to
22 the POINT OF BEGINNING.
23
Page 4 of 6
f
EXHIBIT "A"
Bolsa Chica Annexation OCSD-55 RO 05.60
to the Orange County Sanitation District
1 Unless otherwise noted, all distances are ground and are based upon the Califomia
2 Coordinate System (CCS 83), Zone VI, 1983 NAD (1991.35 EPOCH OCS GPS
3 Adjustment). To obtain grid distances, multiply the ground distances by 0.99997703
4
5
6 The above-described parcel of land contains 71.24 acres, more or less.
7
8 All as shown on Exhibit "B"attached hereto and by this reference, made a part thereof.
9
10 This document was prepared by me or
11 under my direction and supervision.
12 1
13 Dated this IQ day of".4Nu"- 2006
i�
14 1 B'gl9G�
Exp.12/31/06 9
16 Wanda Bale L.S. 7695 NO.7695
17 My license expires 12-31-06 qF
OF
18
19 This document does meet the approval of
20 the Orange County Surveyor's Office
21
22
23
24
25
Page 5 of 6
EXHIBIT "A"
Boise Chica Annexation OCSD-55 RO 05-60
to the Orange County Sanitation District
1 Raymond L. Mathe, County Surveyor
-7"2 Dated this—day of 2006�.,-,-. ��a, -�
3 Sip LlWD SG
4 vF¢p°apND C. 'G�9Fi
m 9
5 Psymond L. Mathe, County Surveyor L.s.6185
� EXP.3-31-05
6 L.S. 6185, My license expires 3-31-06 siy P*
CAl1r
Page 6 of 6
BOARD OF DIRECTORS Meeiin9Dare To ad.or Dv.
03/22/06
AGENDA REPORT 10 Noinbef 1tr Number
9(b)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Bob Chenovdth, Senior Engineering Associate
SUBJECT: UTILITY AGREEMENT NO. 12-UT-935 WITH THE STATE OF
CALIFORNIA DEPARTMENT OF TRANSPORTATION TO RELOCATE
AN EXISTING ORANGE COUNTY SANITATION DISTRICT SEWER ON
ORANGETHROPE AVENUE.
GENERAL MANAGER'S RECOMMENDATION
Approve Utility Agreement No. 12-UT-935 with the State of California Department
of Transportation (Caltrans) to reimburse the Orange County Sanitation District for
relocation design and inspection costs associated with the relocation of an existing
12-inch VCP sewer at the intersection of Orangethorpe Avenue and Imperial Highway
within the City of Yorba Linda for an amount not to exceed $85,000.
SUMMARY
• This agreement allows the Orange County Sanitation District (Sanitation District) to
be reimbursed for an estimated $85,000 associated with the design and inspection
of a Sanitation District sewer to be relocated by Caltrans.
PROJECTICONTRACT COST SUMMARY
N/A
PRIOR COMMITTEE/BOARD ACTIONS
N/A
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
® This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Caltrans is constructing a railroad crossing grade separation over Orangethrope Avenue
and Imperial Highway in the City of Yorba Linda.
The Orange County Sanitation District (Sanitation District) owns and operates sewer
facilities in Orangethorpe Avenue that cross Imperial Highway in the Caltrans project
area.
The Imperial Highway is owned and maintained by Caltrans. At this time, Caltrans has
requested that the Sanitation District sewer be relocated to allow for the new railroad
underpass.
Caltrans is responsible to reimburse the Sanitation District for the costs of the design
and inspection associated with the proposed relocation in Orangethorpe Avenue. The
Sanitation District has estimated the design and inspection costs to be $85,000.
Caltrans will directly pay for the anticipated construction contract to relocate the sewer.
ALTERNATIVES
None
CEQA FINDINGS
CEQA to be certified and filed by Caltrans
ATTACHMENTS
None
RLC:sa
H lntglobaMgeMa Draft ReWftWoint BoarftCanran512Ur-857 AR-0 26%.dm
Page 2
1
MINUTES OF STEERING COMMITTEE MEETING
Orange County Sanitation District
Wednesday, February 22, 2006, at 5 p.m.
A meeting of the Steering Committee of the Orange County Sanitation District was
held on Wednesday, February 22, 2006 at 5 p.m., in the District's Administrative
Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS: OTHERS PRESENT:
Directors Present: Bradley R. Hogin, General Counsel
Jim Ferryman,Vice Chair
Carolyn Cavecche, Chair, OMTS Committee STAFF PRESENT:
Darryl Miller, Chairman, FAHR Committee Jim Ruth, Interim General Manager
Tod Ridgeway, Chairman, PDC Committee Nick Arhontes, Director of Regional Assets and
Jim Silva, County Supervisor Services
Bob Ghirelli, Director of Technical Services
Patrick Miles, Director of Information Technology
Lorenzo Tyner, Director of Finance/Treasurer
Directors Absent: Lisa Tomko, Director of Human Resources
Steve Anderson, Chair Gail Garrett, Committee Secretary
Jeff Reed, Human Resources Manager
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no comments by any member of the public.
(4) REPORT OF THE COMMITTEE CHAIR
Vice Chair Jim Ferryman announced the standing committee meeting dates for March. The FAHR
Committee will meet a week earlier on Wednesday, March 1 at 7:00 p.m. due to a conflict with the
CASA Washington DC conference.
Two CIP Orientation Workshops have been scheduled for Wednesday, March 15 and March 29.
Board members should let Board Secretary know which workshop they wish to attend.
Minutes of the Steering Committee '
Page 2
February 22, 2006 1
(5) REPORT OF THE GENERAL MANAGER
Interim General Manager Jim Ruth presented his monthly status report to the board and noted that
the CIP has been staffs major focus. Budget hearings with staff begin March 13 and the transition to
a two-year budget is going well. His written report was provided to the Board.
Nick Arhonles, Director of Regional Assets and Services, reported on the SARI line breach.
Temporary repairs are in place and permanent repairs are expected to be completed in mid-March.
A full report will be presented at to the March Board.
Mr. Arhontes also reported that his staff is working to discover and resolve possible CalTrans issues
unrelated to the GMR construction damage to the SARI line at the 22 Freeway.
(6) REPORT OF GENERAL COUNSEL
There was no report.
(7) CONSENT CALENDAR ITEMS
a. MOVED, SECONDED AND DULY CARRIED: Approve the minutes of the January
25, 2006 Steering Committee meeting.
b. MOVED, SECONDED AND DULY CARRIED: Recommend to the Board of
Directors to approve Amendment No. 1 to the contract with James D. Ruth,
Interim General Manager, extending the contract to December 31, 2006;
including three weeks paid leave time; and a $100,000 life insurance policy.
END OF CONSENT CALENDAR
(8) ACTION ITEMS
a. (1)Approve and direct the General Manager to pursue and select real property,
within budgeted funds, on behalf of the District for possible Purchase.
(2)Approve and direct the Board Chair to execute on behalf of the District a
Purchase and Sale Agreement in a form acceptable to General Counsel to
acquire the selected property; and,
(3)Approve the use of the acquired property for the North County Yard.
Directors expressed concern regarding item (2)and modified the motion to include a
contingency that the Board of Directors approve the ultimate sale at a future meeting.
Minutes of the Steering Committee
Page 3
February 22, 2005
It was then:
MOVED, SECONDED AND DULY CARRIED: (1)Approve and direct the Interim
General Manager to pursue and select real property, within budgeted funds, on behalf
of the District for possible Purchase.
(2)Authorize the Interim General Manager and Board Chair to negotiate on
behalf of the District a Purchase and Sale Agreement to acquire the selected
property, contingent upon final approval of the Board of Directors, in a form
acceptable to General Counsel; and,
(3)Approve the use of the acquired property for the North County Yard.
(9) INFORMATIONAL ITEMS
a. The Agenda Items scheduled to be reviewed by the Board's working committees in
March were reviewed.
b. The agenda items scheduled to be presented to the Board at tonight's meeting were
reviewed.
(10) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
Director Darryl Miller said that he and Chair Anderson met with Sat Tamaribuchi, Vice President of
Environmental Affairs at The Irvine Company. Mr. Tamabuchi will address their questions at their
next meeting which will take place after their return from Washington DC in mid-March.
Directors Cavecche, Ferryman and Duvall met with Governor Arnold Schwarzenegger at the SAWPA
briefing for the governor and elected officials relating to the Prado Dam project and SARI
improvements. Director Cavecche said she would discuss with OCW D the possibility to invite the
governor to tour the GWRS project.
(11) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(12) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND/OR STAFF REPORT
There were none.
(13) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday, March 22, 2006 at 5 p.m.
f
Minutes of the Steering Committee
Page 4
February 22, 2006 +
The next Board Meeting is scheduled for Wednesday, March 22, 2006 at 7 p.m.
(14) CLOSED SESSION
There was no closed session.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 5:25 p.m.
Submitted by:
C
Gall Garrett
Steering Committee Secretary
H Waglgentlel5Yew4p lbmmMeep0. M222N SC MMulaa.5.Wc
STEERING COMMITTEE Meeting Date To ad.cf Dir.
02/22/06 03/22/06
AGENDA REPORT Rem Number Item Number
a(a) 11(b)
Orange County Sanitation District
FROM: Nick Arhontes, Director, Regional Assets and Services Department
SUBJECT: ACQUISITION OF PROPERTY FOR NORTH COUNTY YARD
GENERAL MANAGER'S RECOMMENDATION
(1)Authorize the Interim General Manager to pursue and select real property, within budgeted
funds, on behalf of the District for possible purchase;
(2) Authorize the Interim General Manager and Board Chair to negotiate a Purchase and Sale
Agreement to acquire the selected property for a purchase price not to exceed $10,500,000,
contingent upon final approval of the Board of Directors, in a form acceptable to General
Counsel; and,
(3)Approve the use of the acquired property for the North County Yard.
SUMMARY
In November 2004, staff provided an initial information item regarding the need for a north
county yard facility that included a site selection process for a possible acquisition.
Since November 2004, District staff has worked with a commercial real estate brokerage firm to
refine the list of likely sites for a north county facility for collections staff. Due to increasing
industrial land prices and lack of availability in the original Orange Crush/Platinum Triangle
vicinity, staff has investigated locations west of that and north of the Garden Grove Freeway.
District staff retained the services of an architectural firm to help evaluate and rank the possible
sites. The analysis examined a series of site selection criteria, including site area, building area,
and proximity to the center of the service area. Other site factors considered included egress,
ease of development, truck route suitability, the tenant improvement costs that were likely to be
needed, and other physical issues such as building dock height. A preferred site was identified
by this evaluation at 7465 Lampson Avenue in Garden Grove. Due to the competitiveness of
the market,the District was unsuccessful in the acquisition.
The District staff with the General Manager's guidance and input and oversight from Directors
Ferryman and Ridgeway and the assistance of Terry Knapper of CB/Richard Ellis (the broker
representing and assisting the District), will continue to be pursuing additional sites. Due to the
continued volatility of the market and the added time needed to identify and then negotiate a
purchase agreement, staff seeks to authorize the General Manager with adequate authority to
move more quickly in negotiating and securing a site. Board approval is needed for this fast
track approach. Staff prefers a commercial approach instead of one involving eminent domain
proceedings.
Staff requests that the Board authorize the Board Chair to execute an agreement for the
purchase price of up to$10,500,000 and in a form acceptable to General Counsel.
C 1.fl.MOKI9u,.m 11(n)N.M Uumy Yad..
aad,.P. 0v 3 Page 1
t
Upon acquisition the District staff will develop and initiate a capital project for the necessary
tenant improvements following established District processes and procedures and will thereafter
commence to move to and use the property. `
PRIOR COMMITTEEIBOARD ACTIONS
Staff proposed the North County Yard with Information Only Report OMTSO4-57, and provided
a status update with an Information Only Report OMTS05-31. An additional report was
developed and submitted for approving the pursuit of the previous Lampson site on 09/28/05 as
item 8(A)for the Steering Committee and item 17 for the full Board on 9/28/05.
PROJECT/CONTRACT COST SUMMARY
The proposed purchase price for the property will not exceed $10,500,000 per the FY 05/06
approved budget.
BUDGETIMPACT
® This item has been budgeted. (Project 15-04, Budget Book Section 8—page 44)
❑ This Item has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
❑ Not applicable(information item)
ADDITIONAL INFORMATION
The Regional Assets and Services Department has internally discussed and developed
business needs of relocating staff directly involved with the collection systems O&M to a more
centralized location.
Sewer maintenance staff and equipment were originally based at Plant 1 in Fountain Valley, but
due to space limitations, were moved to Plant 2 in Huntington Beach in the late 1980's. Space
needs at Plant 2 for facilities growth needs and Treatment plant support staff needs and the
mounting cost of fuel and lost productivity caused by crews having to drive their trucks to
worksites in the middle of our service area now dictate that sewer maintenance should be
moved northward. The proposed site would provide a more centralized location to conduct
business. The freeway-close facility near the"Orange Crush" 57/22/5 Freeway area was
desirable to put staff closer to their work on the small, medium and large pipe cleaning and
inspection programs. Lack of availability of desired sites moved our search to the west.
The facility should serve as a base for approximately 50 staff, their personal vehicles, district's
vehicles, service trucks, parts, supplies, tools and equipment. Space will also be available for
some Engineering and Source Control staff should their business needs be better met by
moving to a more central location. Staff will continue to use the commercial card lock type
fueling facilities countywide and not be constructing any on site fueling facilities for District
vehicles. Space will also be available to host training events and regional meetings for joint city
and sewering agency activities in this more centralized location, and for shop and storage
space. The facility will also be available for Board use as desired.
Site options north of the 91 Freeway will now be more strongly weighed. Staffs opinion is that
the future labor pool will likely use the 91 freeway as a travel corridor to and from work due to
increasing land and rental prices in Orange County.
CJOmumams and SWmgsrmoaM1 Sedin,s%TennWary an—M NleSOLKIMem I(b)Nodh Cmmy Yard doc
Nev-e ba,oe,oa Page 2
Desired facility size remains approximately 3.5 acres, allowing for staff, visitor and all district
and private vehicle parking with approximately 25,000 square feet of single or two story
occupied space for shop, office, meeting, training, locker rooms, and related space.
CEQA FINDINGS
In accordance with CEQA, and based on information learned from the proposed Lampson
acquisition, the District will evaluate the proposed property and the intended use of the property.
The District may conclude that the project qualifies for a categorical exemption from the
California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines 15301 (Class 1 —
operation, repair, maintenance, permitting, licensing, or minor alteration of existing public or
private structures, facilities, mechanical equipment, or topographical features, involving
negligible or no expansion of use). The proposed project will likely utilize the existing structures
at the site consistent with previously established and permitted uses at the property.Ample
parking or room for parking will need to exist at the site, and minor interior tenant improvements
would be anticipated for a preferred industrial type site with existing structures. The District will
consider, however, whether and to what extent a CEQA document must be prepared.
The detailed evaluation in accordance with CEQA and any necessary paperwork will be
developed per our current policies and standards.
ATTACHMENTS
None
e:V.hvi'met3 and sN,inpadpda1 SB ,111em 1ItimnN Filo10L Ma-11(e)Narih�Yad am
Nn„ro.. ppp„p, Page 3
, I
i�
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
Orange County Sanitation District
Wednesday, March 1, 2006—5:00 P.M.
A meeting of the Operations, Maintenance and Technical Services Committee of the Orange
County Sanitation District was held on March 1, 2006, at 5:00 p.m. in the Sanitation District's
Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
OMTS Directors Present: Staff Present:
Carolyn Cavecche, Chair Jim Ruth, Interim General Manager
Don Bankhead, Vice Chair Nick Arhontes, Director of Reg. Assets & Services.
Debbie Cook Bob Ghirelli, Director of Technical Services
Sukhee Kang Jim Herberg, Director of Operations & Maintenance
Ken Parker Patrick Miles, Director of Information Technology
David Shawver Life Kovac, Committee Secretary
James M. Ferryman, Board Vice Chair Penny Kyle, Board Secretary
Jennifer Cabral, Public Information Specialist
Sam Mowbray, Laboratory Manager
OMTS Directors Absent: Mike Moore, EAD Manager
Steve Anderson, Board Chair Mahin Talebi, Source Control Manager
Ed Torres, ECM Manager
Others:
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
The Committee Chair had no report, however, the Directors were asked to review their calendar
for their ability to attend the September OMTS meeting. The annual League of Cities meeting
conflicts with the OMTS meeting schedule, and the chair proposed that the OMTS committee
meeting be rescheduled in order to ensure a quorum. This conflict issue will be revisited in July
to determine if the meeting needs to be rescheduled.
r
Minutes of the Operations, Maintenance 0
and Technical Services Committee
March 1, 2006 r
i
Page 2
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, had no comments.
(6) CONSENT CALENDAR ITEMS
a. Approve minutes of the February 1, 2006 Operations, Maintenance and Technical
Services Committee meeting.
b. OMTS06-11 Receive and file Technical Services Monthly Report, which focuses on
regulatory biosolids and performance measures for the Technical
Services Department.
C. OMTS06-12 Receive and file Operations& Maintenance Monthly Report, which
focuses on compliance, financial data and performance measures for
Operations and Maintenance Department.
d. OMTS06-13 Receive and file Regional Assets and Services Monthly Report for
January which focuses on current business information, performance
trends and financial information of the business units.
Motion: Moved, seconded and duly carried to approve the recommended actions
for items specified as 6(a) through (d) under Consent Calendar, as
corrected.
Director Cook abstained.
(7) ACTION ITEMS
a. OMTS06-14 Recommend to the Board of Directors to: 1). Receive and File Summary
Report re Investigation of Discharge Permit Molation for Dioxin, Phase I,
dated March 1, 2006; and,
2). Approve increase in expenditure for Columbia Analytical Laboratories
for dioxin testing by$50,000 to bring the total purchase order for FY
05/06 to $80,000.
Sam Mowbray, Laboratory Manager, briefed the committee members on
the extensive testing done as a result of a violation for Dioxin, while
reviewing the report submitted for receiving and filing. Additional funding
for testing is needed to continue testing for the source of the violating
chemical in the influent.
Motion: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
Minutes of the Operations, Maintenance
and Technical Services Committee
March 1, 2006
Page 3
b. OMTSO6-15 Recommend to the Board of Directors to 1). Approve Change Order No. 5
to P.O. No. 101322, issued to US Peroxide, Inc. for Purchase of
Hydrogen Peroxide, Specification No. C-2002-90, for a natural gas price
Index based surcharge of$0.063/gallon peroxide (50% solution)for every
dollar price increase above the baseline NYMEX Henry Hub price of
$8.00/MMBtu over the current purchase price of$1.3218/gallon,
excluding sales tax, for the period beginning January 1, 2006 through
June 30, 2006, and for the remaining two one-year renewals; and,
2). Approve Change Order No. 3 to P.O. No. 101696, issued to US
Peroxide, Inc. for Trunkline Chemical Treatment Strategy/Miller-Holder,
Knott and Baker-Gisler Trunk Lines, Specification No. C-2002-88, for a
natural gas price index based surcharge of$0.063/gallon peroxide (50%
solution)for every dollar price increase above the baseline NYMEX Henry
Hub price of$8.00/MMBtu over the current purchase price of
$1.85/gallon, excluding sales tax, for the period beginning January 1,
2006 through June 30, 2006, and for the remaining two one-year
renewals.
Ed Torres, Engineering Manager, briefly explained to the committee the
reasons given by the supplier for the increase, and the need for the
chemical in the treatment process to eliminate odors and minimize
corrosion. The committee directed staff to look at other alternatives to the
use of hydrogen peroxide and their costs and impacts on operations.
Motion: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
(8) INFORMATIONAL ITEMS
There were none.
(9) REPORT OF DIRECTOR OF INFORMATION TECHNOLOGY.
Director of Information Technology, Patrick Miles, reported to the committee that staff will be
preparing as part of the District Strategic initiatives program, a program enterprise Information
technology strategic 3-5 year plan to outline the information technology priorities and also guide
management in critical decision-making. The plan will be reviewed and updated quarterly, and
every two years the plan will be updated to coincide with the budget. Staff is developing an
RFP and will be looking for a partner to develop this plan. The Orange County Fire Authority
has a successful model plan in place that Staff will evaluate, and the proposal will be submitted
to the OMTS Committee for consideration In approximately six months.
r
Minutes of the Operations, Maintenance
and Technical Services Committee
March 1, 2006
Page 4
(10) REPORT OF DIRECTOR OF OPERATIONS AND MAINTENANCE
Mr. Jim Herberg, Director of Operations and Maintenance, reported the Sanitation District met a
milestone In the completion of the trickling filters on February le, and have been operating with
a better than anticipated result.
Mr. Herberg also followed up on an inquiry to purchase chemicals jointly with other agencies in
order to secure the best prices possible. Previous investigations conducted in 2001 with other
sewer agencies proved to be ineffective due to various obstacles. The Sanitation District will
pursue further investigation to purchase jointly with the Water District for some common
chemicals in order to achieve cost savings.
(11) REPORT OF DIRECTOR OF TECHNICAL SERVICES
Director of Technical Services, Bob Ghirelli introduced Jennifer Cabral, Senior Public
Information Specialist, who reported on efforts of an outreach campaign educating the public
about the dangers of dumping pharmaceuticals in the sewer.
(12) REPORT OF DIRECTOR OF REGIONAL ASSETS AND SERVICES
The Director of Regional Assets, Nick Arhontes, reported the SARI line contractor that damaged
the line was finishing the repairs, and should complete repairs by Monday, March e.
(13) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
There were none.
(14) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
There were none.
(15) FUTURE MEETING DATES
The next Operations, Maintenance and Technical Services Committee meeting is scheduled for
April 5, 2006, at 5 p.m.
(16) CLOSED SESSION
There was no closed session.
Minutes of the Operations, Maintenance
and Technical Services Committee
March 1, 2006
Page 5
(M ADJOURNMENT
The Chair declared the meeting adjourned at 6:30 p.m.
Submitted by:
r /w�
Liha Kovac
Operations, Maintenance and Technical Services
Committee Secretary
H:bapttaWda\0MTS@006\0306\030106 OMTS Minotes.Aoc
OMTS COMMITTEE Nee0n9Date r°ea° D,
03/Ol/O6 03/22/06
AGENDA REPORT Rem Number Iben Number
OMTS06-14 12(b)
Orange County Sanitation District
FROM: Robert P. Ghirelli, D.Env., Director of Technical Services
Originator: Samuel L. Mowbray, Ph.D., Laboratory Manager
SUBJECT: Update on Investigation of Discharge Permit Violation for Dioxin
GENERAL MANAGER'S RECOMMENDATION:
1. Receive and File Phase I Dioxin Summary Report.
2. Approve increase in expenditure for Columbia Analytical Laboratories for dioxin
testing by $50,000 to bring the total purchase order for FY 05/06 to $80,000.
SUMMARY
• A previous report was made to OMTS in December 2005 on this subject. In July
of 2005, the Ocean Discharge Permit limitation for dioxin was violated.
• An investigation in September and October concluded that the plant influent
contains dioxin at a concentration that would exceed the final effluent limit 3 of 7
times (43%).
• A further study concluded that an average of 50% of the influent concentration of
dioxin (range 3.8 to 81.2%) was removed during primary treatment.
• In the current phase of the investigation, another study concluded that an
average of 95.2% (range 93.2 to 97.5%) of dioxin in the influent to the activated
sludge secondary process (plants 1 & 2 combined) was removed in that
treatment.
• The average combined removal efficiency for dioxin is approximately 90% for
100 % secondary treatment and 80% for 50% secondary treatment.
• Chlorination of primary influent at plant 2 was shown to produce dioxin. Influent
and effluent to the process were compared for dioxin concentration. The data
were insufficient to determine whether the amount produced might result in a
violation of the permit. The scientific literature lists the chlorination process in
wastewater treatment plants as a potential source of dioxin.
Next Steps:
• The proposed next phase of the investigation will be a study to test for dioxin and
chemical precursors to dioxin in the influent trunk-lines.
• If a particular trunk-line shows high concentrations of these chemicals, a further
study will be made of industrial discharges to that pipe that might be associated
with dioxin precursors or dioxin itself.
• The budget for contract laboratory services for this phase of the dioxin study will
be approximately an additional $50,000.
M. WWEoiEMMm WRa+ e®anpnm a npsia•F�YOdm lWb)oom aoc
w.,. m� Page 1
PRIOR COMMITTEE/BOARD ACTIONS:
Initial, preliminary report made to OMTS December 6, 2005. `
PROJECT/CONTRACT COST SUMMARY:
To Date: 46 tests for Dioxin/Furan at unit price of equal approximately $30,000
Projected Costs for Phase II Trunk-line and Industrial Source Testing: $50,000.
The laboratory budget should have sufficient funds to cover these costs. However, the
amount of the purchase order to Columbia Analytical Laboratories, including routine
permit required testing and this project, is estimated to be $100,000. Funds will need to
be transferred from other areas of the laboratory budget to the contract lab budget line
item. The Board is asked to approve this transfer of funds within the lab budget and
agree to an increase in the amount of the purchase order to Columbia Analytical
Services.
Continuation of work on this project into the next fiscal year will be included in the fiscal
2006/07 budget.
BUDGET IMPACT
X This item has been budgeted. (Line item: Div. 630 Budget, Object 53060)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
ALTERNATIVES
CEQA FINDINGS: Not Applicable.
ATTACHMENTS: See Phase I Summary Report
H Wepl�dPga Repo $ WB dlyrnM 6Pperga RepataW] ATW 171b1 War
Rwn 01ro % Page 2
u
V Summary Report
Investigation of Discharge Permit Violation for Dioxin
Phase 1.
Incidence in the Influent Wastewater and Removal during Wastewater Treatment
March 1,2006
Samuel L. Mowbmy, Ph.D.
Laboratory Manager
Orange County Sanitation District
Background
On December 6,2005,a preliminary report of findings on this subject was made to the OMTS
Committee of the Sanitation District Board. The statements and conclusions made at that
time are summarized below:
1. In July,2005 the Orange County Sanitation District exceeded the Ocean Discharge
Permit(NPDES) limitation for a group of chemicals that are called chlorinated
dioxins and furans(hereafter called dioxin). The limit is 0.706 picograms per liter
(pg/L)of toxic equivalents(TEQ),and the value reported in the Discharge
Monitoring Report(DMR)was 6.77 pg/L. This permit limitation was added in
November 2004.
2. If a regulation for dioxin had existed prior to November, 2004,a review of the
laboratory results for all final effluent values concluded that OCSD would have
violated the permit 4 times out of 21 samples(19%).
3. Dioxins(see chemistry discussion below)is regulated at a concentration
approximately one thousand times lower than the chlorinated pesticide,chlordane,
and approximately one hundred thousand to one million times lower than most of
the other chlorinated organic chemicals in our ocean discharge permit. They are
considered among the most toxic groups of chemicals known. Public health risks
reported in the scientific literature include(not limited to)cancer,developmental
disorders, endocrine disrupting activity,and brain physiology abnormalities.
4. In a study performed in October of 2005,the concentration of dioxin at the
influents to plant I and plant 2 ranged from 57%to 232 %of the permit
limitation. Of seven 24 hour composite samples collected over a two week period,
two would have exceeded the permit limit assuming no reduction in dioxin
concentration during wastewater treatment.
5. Results of removal studies due to primary treatment alone at Plant 2 indicated that
dioxin concentration is reduced by a factor of 2 to 5 in the effluent relative to the
influent. The scientific literature supports the conclusion that this is not due to
biodegradation, but rather to adsorption of dioxin to particles in wastewater which
ultimately end up in biosolids. The data from 24 hour time composite samples are
/of 8
H:Wept*Wd1%11oard Agenda Repons12006 Board Agenda&Agenda Rqy WDRmm 12(b).Dimn-M I.doc
e
shown in the following table. The reasons for the variability have not been studied
in depth,but are likely related to variability in the efficiency of the treatment
process and chlorination during primary treatment. The increase in concentration
in the effluent relative to the influent on 10/92005 is most likely the result of the
chlorination used in the primary treatment process.
Plant 2 Primary Process-Dioxin Removal
Date Sample Primary Influent Primary Effluent Percent Removal
Collection rams/L TE rams/L TEQ
10/3/2005 .968 .533 44.9
10/52005 .487 .101 78
10/72005 1.04 .196 81.2
10/9/2005 .347 .422 - 21.7
10/112005 .687 .165 76
10/132005 .921 .281 69.5
10/152005 .606 .583 3.8
Average 1 .722 1 .326 1 51.4
Role of Secondary Treatment in Dioxin/Furan Removal
A second study was initiated in December,2005 to specifically evaluate the removal of dioxin
in the activated sludge(AS)secondary treatment process. Twenty-four hour composite
samples of the AS influent and effluent at both Reclamation Plant 1 and Wastewater
Treatment Plant 2 were collected on three separate days and analyzed for dioxin.
1. The influent and effluent values are presented in the following table:
Plant 1 AS Influent AS Effluent Percent
nms/L TE rams/L TE Removal
12/142005 .0715 .00241 96.6
12/152005 .0485 .00277 94.3
12/162005 .0789 .00267 %.9
Average .0663 .00262 95.6
Plant 2
12/142005 .0771 .00492 93.6
12/152005 .134 .003412 97.5
12/162005 .0679 .01 93.2
Averse .0930 .0044 1 93.8
2. The influent to the AS at both plants averaged about 10%of the final effluent
limit. The effluent concentration was approximately 22 or 23 fold lower than the
influent with an average removal efficiency at both plants combined of 95.2%.
3. Based on a calculation of composition of the final effluent from the various areas
of the treatment plant,the overall removal of dioxin through the primary and
secondary treatment process at a treatment level of 100%secondary is expected to
2 of
u`aePt" m&XRvdnWd.Rep�Wze06aoadAs &a,Me.Repm V)306wm,12(b).Dimn-naL.
d be about 90-95%. At a mixture of 50:50 primary/secondary,this removal
efficiency will be about 80-90%.
4. A portion of the study performed in October 2005 examined the effect of the full
treatment process at plant 1: primary sedimentation,secondary biological
treatment(AS)and chlorination. Chlorination occurs following combining the
primary and secondary treatment effluents. Samples of influent were collected at
the influent to plant 1 and samples of effluent were collected at the end of the 120
inch interplant pipeline at the Plant 2 Ocean Outfall Booster facility. All samples
were time composites and were collected over a 24 hour period.
The data are shown in the following table.
Plant I Treatment Process—Dioxin Removal
Date Primary Influent Plant 1 Effluent Percent Removal
(ligrama/L TE rams/L TE
10/3/2005 2.958 1.086 63.3
10/5/2005 .306 .0285 90.7
10/7/2005 .626 .215 65.7
10/9/2005 .513 .103 79.9
10/11/2005 .326 .0446 86.3
10/13/2005 .574 .0532 96.3
10/15/2005 .421 .0593 85.9
Average AN .227 72.2
Next Steps and Future Research
Background
The scientific literature discusses several potential industrial sources of dioxin including the
wastewater treatment industry. One of the most prominent potential sources is the paper&
pulp industry in which bleach is used to whiten the paper. As has been mentioned above,
samples taken from one such industry in Orange County were negative for the discharge of
dioxin. Other industries mentioned in the literature as potential dioxin source are involved in
the bleaching and dyeing of fabrics. There are such industries in Orange County that have not
yet been investigated.
Relative to the water and wastewater industry,dioxin appears to be formed primarily from
chemical precursors or building blocks. One literature reference from the US Environmental
Protection Agency lists at least 28 known chemical precursors. They are all derivatives of
benzene or phenol that have varying numbers chlorine atoms added. These building blocks
undergo the addition of chlorine atoms and subsequent joining(condensation)together to
form the various dioxins/furans. There are various chemical mechanisms for the addition of
chlorine atoms,bid a predominant one is from chlorine gas or bleach(hypochlorite). Chlorine
added to the chemicals precursors will result in the direct formation of dioxin. The literature
tells us that the final yield of dioxin is between 0.1 and .01 percent of the starting material.
Additionally,several laboratory studies have shown that dioxin can be formed from the action
of certain types of bacteria that contain a chemical called peroxidase. In the presence of
chemical precursors and hydrogen peroxide,these bacteria can form dioxin. It appears that
3 of 8
H:%dept�g de�oad Ag de RIMUU006 Bond Agmde a Ag.d Rep.B 0306Wh.12(bJniwuo-All Ldoe
r
the ingredients that are necessary to form dioxin are a suitable benzene/phenol precursor,a W
source of chlorine and an oxidant(a chemical such as peroxide or ultraviolet light). At
various steps in the collection and treatment of wastewater, it is likely that all of these
ingredients are present.
One potential source of`oxidizing' potential for dioxin formation is ultraviolet light. One
recent study describes triclosan as another potential precursor to dioxin. Triclosan is a
common antibacterial agent found in soaps,toothpaste, shampoos and other common
household products where a preservative is necessary. Chemically it is composed of two
chlorinated phenol rings(similar to the precursors above) linked together with a single oxygen
atom(mono-oxi rather than di-oxi or two oxygens found in dioxin). Experiments have shown
that about 10%of the original triclosan is converted to dioxin following a 5 to 10 minute
exposure to ultraviolet light. Recent studies on Emerging Chemical Constituents of Concern
have shown that triclosan is present in many water sources collected from around the country
at concentrations in the range of 5 to 10 micrograms/L(parts per billion,ppb). The potential
for this chemical and others similar to it being a source of dioxin in the OCSD wastewater
effluent is unknown,but the possibility is worth noting.
Experimental Plan
The proposed next phase of the investigation will be a joint Laboratory& Source Control
study to test for dioxin and chemical precursors to dioxin in the influent trunk-lines to plant 1
&2. If a particular trunk-line shows higher than average concentration of dioxin, a follow-up
study will be made of industrial discharges to that pipe that might be associated with dioxin
precursors or dioxin itself. The time-line for this project is completion within approximately
6 months. If the project is approved it should be completed by early fall 2006. The budget
for contract laboratory services for dioxin analysis will be approximately an additional
$50,000. This test is one that the OCSD laboratory currently is unable to perform. All other
costs will be assumed within the operating budgets for the Laboratory and Source Control.
The Chemistry of Dioxin
(I hope all members of the OMTS will read this section. I have attempted to remove as much
chemistry jargon as possible,but I think it is valuable for each of you to understand a bit of
the chemistry of the formation of dioxin.)
1. Dioxin for the purposes of this report is a mixture of two types of very similar
chemicals called dioxin and Baran. You will see how they are related as we continue
this discussion.
2. These chemicals all have two ring structures that are joined together by chemical
bonds. Each ring has six carbon atoms are linked together into a closed ring.The two
rings are joined together by 2 oxygen atoms(symbol `O')in the case of dioxin.
Furans are the same type of chemical with the two rings joined by one carbon-
oxygen-carbon link and one carbon(symbol `C')to carbon link. The drawing below
is an example. The straight lines connecting the atoms in the molecules indicate a
chemical bond. DON'T PANIC YET!!! READ ON!!! There is an explanation of the
chemistry to follow!!
4 of
Hldeptlag=dagMard Agmda Repotla12006 Bomd Agmda&Agmda Repo W306\tem 12(b).Diom-Aa LAM
W q � C q C �IIpEII�O�C��CI
CI ?'` IeC'I� ® ,cl CI / —�c ICI
q CI q LI
one type of dioxin one type of furan
(oCacblorodi0amo aarAWIn) OnnioM1bmEaenxoNnn)
3. Each of the two rings has the chemical called chlorine(symbol 'Cl')attached to one
or more of the carbon atoms. You can see that each ring can have up to 4 chlorine
atoms since there are 4 open carbon atoms in each ring. if all available carbon atoms
are bonded to one chlorine atom,we call this an octo-chlorinated ring structure(octo
meaning eight). Therefore,there is the potential for a large variety of different
chemicals in this dioxin and furan group. In fact, several hundred exist.
4. Another concept is necessary to be introduced. Each of these dioxin and furan
chemicals is assigned a toxicity equivalent factor(TEF)that was previously
determined in laboratory experiments. Of the several hundred possible separate
chemicals called dioxins and furans(we call these congeners),only 17 are considered
of high enough toxicity to be included in those that are subject to regulation. To
determine the total toxicity equivalency(TEQ),first the concentration of the
chemical is determined,then it is multiplied by the TEF and finally all of the separate
TER are added together to get the Total Toxicity Equivalent.
5. Sorry, but you need just a bit more chemistry. You need to know that oxygen can
form two chemical bonds. That is, it can bond with up to two other atoms. Also, it
can be joined with two bonds to another oxygen atom,and we call this oxygen gas or
02• As a way of writing these `stick' structures,the straight lines with no bond to
another atom represent the potential to form a chemical bond.
I I
—C—O—C— —O—H O=O
I I
ether alcohol oxygen gas
linkage linkage (Oil
6. Likewise,carbon can form 4 bonds with other atoms. It can form single bonds to
other different types of atoms; it can have two bonds to another carbon atom(called
ethene or ethylene) and two single bonds to other atoms; or it can form 3 bonds to
another carbon atom(we call this acetylene)and one bond to some other atom.
I I I I
—c—c— —c—c— —C=C—
I I I I
ethane ethane acetylene
7. Chlorine can form only one chemical bond. For this discussion we will focus on the
chlorine bond to carbon in the ring structures for dioxin or furan.
5 of8
H'.\dcpl\sgenda\Board Agenda Repom\2006 Board Agmda&Agenda Repo90306\Item 12(b).Dioxin-Aft I.doc
8. Hydrogen(symbol `H')can also only form one chemical bond. It can form hydrogen
to oxygen bonds(As in water or alcohol. Actually, for those of you who are
chemistry savvy,did you ever consider that water is the alcohol of hydrogen?), it can
form carbon to hydrogen bonds(as in most chemicals called hydrocarbons—dioxin
and furan are in this class), or it can form a bond to another hydrogen atom and we
call thisH2 or hydrogen gas.
9. In the case of dioxin and furan,the ring connecting the carbon atoms is a mixture of
carbon to carbon single bonds and carbon to carbon double bonds. Typically,three
carbons have double bonds to another carbon atom and three carbons have single
bonds to another carbon atom. When the only other atom in the molecule is
hydrogen, we call this benzene. When one of the carbon atoms in the ring is bonded
to oxygen which in turn is bonded to hydrogen(we call this an alcohol link)the
chemical is called phenol.
When all carbon atoms in a six member ring are joined together with only single
carbon to carbon bonds,and each carbon atom also forms 2 bonds to hydrogen atom,
we call this cyclohexane. The term `cyclo' is used because the carbons are in a circle
or ring and hexane refers to the six carbon atoms.
I r" V
H'C®C"C"H HNC/C�, ,0 HNC/C�Cc H
II c „
H�CC\H H�C-�CleC�H HZ CC�„
„H
benzene phenolor cyclohexane
1-hydroxybenzene
10. The subject of benzene and phenol was introduced above, because these are the
building blocks for a large class of chemicals that contain chlorine and that have
become concerns for the wastewater industry. An example of this type of chemical
that most of us are aware of is PCB(polychlorinated biphenyl, or many-chlorinated
with two phenol rings). There are many different kinds of PCBs(again called
congeners)depending on the number of chlorine atoms on the benzene ring). Many
of the so-called chlorine based pesticides are based on this chemical structure.
Dioxin and furan is based on this structure. One of the PCB congeners with chlorine
bonded to each carbon atom on the joined rings is shown below. Note that in this
case the two phenol ring structures are fused or joined together.
o� o�
ci"cll'�c"c/c"c/ci
C1,c®�/c�h.c�c1
ci ci
6 of8
H'.\depl\eymdn\Bomd Agenda RepoMU006 Bond Agenda&Agenda Repo W306\I1em 12(b).Dioxin-Art l.dm
11. As has been mentioned earlier,these chlorinated phenols and benzenes join together
under certain conditions to form dioxin and foram. The conditions theoretically exist
in the pipes of our collection system and indeed within the portion of the treatment
facility where chlorination takes place. Whether or not dioxin and furan is produced
depends on the concentration of the precursor chemicals(generally chlorine
substituted phenols,benzenes and similar chemicals)and the length of time of contact
with those chemicals. Hypothetical sequence of chemistry below.
I II
CIS �C�L�O—II CI�L�C�L�G
G/cam/ \G Iq�L�C®L�LI
G G
1 in Onepleseace or
oUwobrRed wm
nergy
otller anidizedenergy
source
G G
CI�L�C��O�C�Cq /G
yi n oo.� I
G G
dioxin
G
cl cl
iLl
G G -
furan
plus HCI(hydrochbric acid)and HOH(water)
7 oj8
H:1A.p0agendatB.d Agenda Rqp \2006 Bond Agenda&Agenda Re,a W306Vtem 12(b).nioxm-M Ldac
I7�
12. There is one more chemical structlue 1 would like to present to you,and it is for the 7
disinfectant Triclosan. This chemical was presented above in the Background
Section. It was mentioned that Triclosan is very similar to dioxin and can be easily
converted to dioxin with ultraviolet light. There are very probably other oxidizing
chemicals that can also promote this conversion. The chemistry is shown below.
� ,pyy ,pyy I H
H
X N
tricloaan
1 ultmoolet light
ottler ozideers
H H
H"C
\C D,C� \C,�Gq, ,H
CIS
M H
dioxin
8 of
H'.Wgh\W Wa Iwd Ageda RepoMUM6 Beard Agenda&Agenda Re W306VI 12(b).Uiom-An I.doc
t
" MINUTES OF PLANNING, DESIGN, AND CONSTRUCTION
COMMITTEE MEETING
Orange County Sanitation District
Thursday, March 2, 2006, at 5 p.m.
A meeting of the Planning, Design, and Construction Committee of the Orange County
Sanitation District was held on Thursday, March 2, 2006,at 5 p.m., in the Sanitation District's
Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
PDC COMMITTEE MEMBERS:
Directors Present: STAFF PRESENT:
Tod Ridgeway, Chair David Ludwin, Director of Engineering
Norm Eckenrode, Vice Chair Tod Haynes, Construction Manager
Alberta Christy Matt Smith, Engineering Manager
Larry Crandall Dave May, Project Manager
Doug Davert Olga Cervantes, Principal Contracts Administrator
Patsy Marshall Jennifer Cabral, Public Information Specialist
Roy Moore Penny Kyle, Committee Secretary
Harry Sidhu Wendy Sevenandt
Jim Ferryman, Board Vice Chair Chuck Winsor
Directors Absent: OTHERS PRESENT:
Steve Anderson, Board Chair
Charles Antos
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were none.
(4) REPORT OF THE COMMITTEE CHAIR
Committee Chair Tod Ridgeway announced he would need to leave at 5:30 and Vice Chair
Eckenrode would preside over the meeting at that time.
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager,was not present.
PDC Committee Minutes '
Page 2
March 2, 2006
(6) REPORT OF THE DIRECTOR OF ENGINEERING
David Ludwin, Director of Engineering, reported that the Board Secretary requested the committee
be polled for attendance at the September r meeting for a possible conflict with the League of Cities
conference being held during that time. The Committee determined the meeting should be
rescheduled to Thursday, September 14, 2006 at 5:00 p.m.
Mr. Ludwin provided updates on: EIR statement for the Santa Ana River Interceptor project had been
received and staff was reviewing;design-build legislation was introduced on February 24; and, costs
associated with Big Canyon Country Club project.
The Bushard Trunk Sewer Project will be restarting at the end of the month and Jennifer Cabral,
Public Information Specialist, provided a report on public outreach efforts that are underway.
(7) REPORT OF GENERAL COUNSEL
General Counsel was not present.
(8) CONSENTCALENDAR
a. Receive,file, and approve minutes of the February 2, 2006 Planning, Design, and
Construction Committee Meeting.
b. CHANGE ORDER REPORTS
Action on change orders that require PDC Committee or Board approval will be taken
separately. There are two changes orders this month for PDC approval.
C. PSA AND AMENDMENT REPORT
Action on PSAs and Amendments that require PDC Committee or Board approval will be
taken separately. There were no PSAs and no Amendments approved by the General
Manager from January 20 through February 23, 2006.
d. FACILITIES ENGINEERING CONSULTANT ACTIVITY REPORT
This report is an information only item.
e. SANTA ANA RIVER INTERCEPTOR RELOCATION AND PROTECTION STATUS
REPORT
This is an information only item.
I. BUSHARD TRUNK SEWER REHABILITATION REPORT
This is an information only item.
MOTION: It was moved, seconded, and duly carried to approve the recommended actions
specified as Items 8(a)through (f).
a PDC Committee Minutes
Page 3
March 2,2006
END OF CONSENT CALENDAR
(9) ACTION ITEMS (Items a-m)
a. PDCO6-16 MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 1
to Tenant Improvements to Building "H`at Plant No. 1, Job No. FE04-05,
with DKG Construction, authorizing an addition of$268, increasing the
total contract amount to $85,268; and, (2)Accept Tenant Improvements to
Building"H" at Plant No. 1, Job No. FE04-05, as complete, authorizing
execution of the Notice of Completion and approving the Final Closeout
Agreement. This item is for PDC approval per Delegation of Authority by
Board Resolution No.04-08.
b. PDCO6-17 Recommend to the Board of Directors to (1) Ratify Change Order No. 7 to
Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange
Trunk Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk
Improvements, Contract No. 7-41; and City of Tustin Project Nos.6106
and 6151, with ARB, Inc., authorizing an addition of$52,980, increasing
the total contract amount to $20,277,304; and (2)Approve reimbursement
to the City of Tustin in the amount of$24,000 for deletion of the final
asphalt overlay along Holt Avenue between Irvine Boulevard and Newport
Avenue intersection.
Staff requested this item be pulled for consideration.
C. PDCO6-18 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve a Professional Services Agreement with Earth
Tech, providing for engineering services for Rehabilitation of Magnolia
Trunk Sewer, Contract No. 3-58, for an amount not to exceed $699,096.
d. PDCO6-19 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve a Professional Services Agreement with Carollo
Engineers for studies and a preliminary design report for Headworks
Rehabilitation/Refurbishment at Plant No. 1, Job No. P1-71, for an
amount not to exceed $339,738.
e. PDCO6-20 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve a Professional Services Agreement with Camp,
Dresser 8 McKee, Inc.for engineering services including Design-Build bid
document preparation for Cable Tray Improvements at Plant Nos. 1 and 2,
Job No. J47,for an amount not to exceed $2,251,548.
f. PDC06-21 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 1 to the Professional Services
Agreement with Malcolm Pimie, Inc. providing for construction support
services for the Bushard Trunk Sewer Rehabilitation,Job No. 1-2r1,for an
additional amount of$137,937, increasing the total amount not to exceed
$223,045.
g. PDC06-22 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 1 to the Professional Services
Agreement with Brown and Caldwell for engineering services for Plant
PDC Committee Minutes v
Page 4
March 2,2006
No. 2 Primary Sludge Feed System Project, Job No. 152-91, providing for
additional engineering services for an additional amount of$312,816,
increasing the total amount not to exceed $2,990,366.
h. PDC06-23 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 4 to the Professional Services
Agreement with Camp, Dresser, & McKee for Rehabilitation of Odor
Control Facilities, Job No. J-71-8, providing for additional engineering
services,for an additional amount of$327,172, increasing the total
amount not to exceed $4,918,704.
I. PDCO6-24 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 6 to a Professional Services
Agreement with Lee& Ro, Inc., providing for additional engineering and
construction support services for Replacement of the Bitter Point Pump
Station, Contract No. 5-49; Replacement of the Rocky Point Pump
Station, Contract No. 5-50; Rehabilitation of the 14m Street Pump Station,
Contract No. 5-51; and Rehabilitation of the "A"Street Pump Station,
Contract No. 5-52,for an additional amount of$328,566, increasing the
total amount not to exceed $4,809,382.
j. PDCO6-25 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve a Cooperative Agreement with the City of
Huntington Beach for remaining work to be completed on the Bushard
Trunk Sewer Rehabilitation, Job No. 1-2-4.
k. PDCO6-26 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve a Reimbursement Agreement with Orange County
Water District for Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4.
I. PDCO6-27 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to(1)Approve a Sole Source Agreement with Southern
California Edison for engineering services,fees, materials, and labor for
66kV Substation at Plant No. 1, Job No. P1-97, for an amount not to
exceed $6,052,000; and (2) Increase the project budget in the amount of
$4,302,947 for a total amount of$9,475,538.
M. PDCO6-28 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to reject all bids submitted for Tenant Improvement for
Engineering/Construction Trailer Complex 'C', Job No. FE04-36.
(11) CLOSEDSESSION
There was no closed session.
(12) OTHER BUSINESS,COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There were none.
(13) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
PDC Committee Minutes
Page 5
March 2, 2006
There were none.
(14) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(15) FUTURE MEETINGS DATES
The next Planning, Design, and Construction Committee Meeting is scheduled for Thursday, April 2,
2006 at 5 p.m.
(16) ADJOURNMENT
The Chair declared the meeting adjourned at 6:06 p.m.
Submitted by:
Penny M. IQ' e
Committee Secretary
H]dePrhrWublb Afalmrs301eS MIBSW30206 Draft PDC WWWW doe
PDC COMMITTEE rweanay lP TO Bd.dgr.
03'M n3/22/06
AGENDA REPORT Rem Numb- lbem Number
PI
AGENDA 13 b
Orange County Sanitation District
Collections
Facilities
FROM: David Ludwin, Director of Engineering
Originator: Milind Joshi, Project Manager
SUBJECT: REHABILITATION OF MAGNOLIA TRUNK SEWER, CONTRACT NO. 3-58
GENERAL MANAGER'S RECOMMENDATION
Approve a Professional Services Agreement with Earth Tech, providing for engineering
services for Rehabilitation of Magnolia Trunk Sewer, Contract No. 3-58, for an amount not
to exceed $699,096.
SUMMARY
The purpose of this project is to prepare a condition assessment report to prioritize the
rehabilitation needs for a nearly 12 mile long sewer line and will consist of:
• Review of the existing information including the Close Circuit Television (CCTV)
recording and inspection report.
• Performing additional CCTV investigation and physical inspection of the pipeline.
• Evaluation of the condition of the pipeline.
• Prioritizing the urgency of repairs based on the severity and nature of damage.
• Evaluation of various rehabilitation options based on the current available technologies.
• Recommendation of the most cost-effective and practical rehabilitation technique for
each of the damaged section 3 of the pipe backed with estimated cost of repairs.
• Requests for proposals were sent to four engineering firms. Three firms provided
proposals to the Orange County Sanitation District (Sanitation District). The proposals
were evaluated in accordance w@h defined Sanitation District procedures and staff
recommends the approval of Professional Service Agreement (PSA)to Earth Tech.
PRIOR COMMITTEEIBOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
Please see attached budget information table.
nm,,,mmme Page 1
BUDGETIMPACT r
® This item has been budgeted. (Line item: FY05-06 CIP, Section 8, Page 20)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The 1999 strategic plan identified the Magnolia Trunk Sewer as a facility that needed
evaluation and repairs.
The overall length of the pipeline under consideration is approximately 12 miles. Based on
the historical information, the Sanitation District staff believes that the extent of rehabilitation
effort necessary to restore the pipeline is likely to vary along the entire stretch of the
pipeline depending upon the current conditions. Therefore, although the overall approved
budget for this project is $77,583,217, it may not be necessary to rehabilitate the entire
pipeline at one time.
The condition assessment study will enable the Sanitation District prioritize the repairs. The
current overall budget for the proposed condition assessment is $1,000,000 and the budget
for the Professional Service Agreement(PSA)for the Condition Assessment Study is
$750,000.
ALTERNATIVES
A "No Project" alternate will result in substantially reduced reliability of the Magnolia Trunk
Sewer potentially causing service interruption and possibly nuisance to the public.
Commencing the preliminary design and detail design effort solely based on the older
information may result in inappropriate repairs and unnecessary expenditure of the
available funds.
Conducting a condition assessment study, as proposed, has been found to be the most
economically feasible alternative.
CEQA FINDINGS
This project has been determined to be exempt from CEQA under Article 19 (Categorical
Exemptions), Section 15301 (d) existing facilities, restoration or rehabilitation of deteriorated
or damaged structures. A Notice of Exemption is being filed.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Summary of Staff Evaluation of Proposals
MJ:kf
H:lntglobaMgeMa Drell Reporl$WDC%3.W AR Magnolia TS.doc
a W, otawa Page 2
BUDGET INFORMATION TABLE
REHABILITATION OF MAGNOLIA TRUNK SEWER
CONTRACT NO. 3-58
ORIGINAL CURRENT
PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED
-BUDGET ESTIMATED EXPENDED
P, INCREASE REVISED AUTHORIZED TO AUTHORVATION TOTAL RbJECTIPHASE AUTHORIZED PROJECT E%TO R DATE
y
BUDGET BUDGET 'BUDGET DATE. REDIIE9T AUTHORDATIDN TO DAIS TO DATEI%)
IDEbBEA9E .
Phase l-Project Develoment $ - $ 1,000.000 S - $ 1,0000D0 $ 250000 S 699096 $ 949,006 $ 14.140 1%
Phase 2-Prelimine Desl n $ 417.244 $ 3,162650 $ - $ 3,162AW $ - $ - $ - $ 0DIV/01
Phase 3-Deal n 5 3.337.955 S 3.844.060 $ - $ 3.644.060 S - S - S - $ fDIVl01
Phase 4-Conetmdloo $ 31.165.871 $ 57,178.769 $ - $ 57.178769 $ - 4 - $ a01V/01
Phase 5-Cowlsslonhg S - $ 1,162.905 $ - $ 1.162905 $ 3 - 3 CDIV/01
Phase 6-Close-Out f 89,540 E 5t 2.248 $ - $ 512.248 S $ - $ f01VNl
Phase 7-C,hfin,mcy $ 5.563.259 S 10.922,585 $ - $ 10,922.585 $ 5 - S *DIV/01
PROJECTTOTAL S 40,653.869 $ 77.583,217 $ - 5 77.583.217 1 1 $ 250.000 1 $ 699.0961 $ 949J196 $ 14,140 1%
Relmbumble Costa
PROJECT NET 1 $ 40.563.669 1 S 77,583,217 $ - $ 77,583.217 !_.. $ 250,000 $ 599,098 $ 949.D98 1 $ 14.140 1%
PSA/Contract
PSA-Condition Assessment Is - f 750.000 E - $ 750.000 $ - $ 699098 1 $ 699.098 E
Constmetion Contract $ 31.165.871 1$ 64.612927 $ -1 $ 54.612,927 1. S - $ -IS -IS
EDMS:003801188
Professional Services Agreement Status Report
Rehabilitation of Magnolia Trunk Sewer
Contract No 3-58
Total Project Budget: $77,583,217
Consultant: Earth Tech
Start Date of Project: May 2006
Date Amendment Description Cost Accumulated
Costs
Pending Original PSA Engineering Services for Condition Assessment $699,096 $0
for the Rehabilitation of Ma nolia Trunk Sewer
EDMS:003805025
02/23/06
Revised 05H4/98
1
REHABILITATION OF MAGNOLIA TRUNK SEWER
CONTRACT NO. 3-58
Summary of Staff Evaluation of Proposals
The following consulting firms received Requests for Proposals:
• Black & Veatch
• Malcolm Pirnie
• Earth Tech
• PBS&J
Black & Veatch declined to submit a proposal. Representatives of three firms
attended the mandatory pre-proposal meeting conducted on November 28, 2005.
All three consulting firms submitted responsive proposals, which were received
on December 14, 2005.
An in-house Evaluation Team, including four Orange County Sanitation District
(Sanitation District) staff members from the Engineering and Operations
Departments was formed to review and evaluate the proposals. Each member of
the Evaluation Team individually ranked the proposals. Each proposal was
graded from one to ten (ten being the best) in six weighted categories described
below:
1. Project Approach and Understanding of Scope of Work (Weight 10) —
Rates the team's understanding of the Scope of Work included in the RFP.
2. Plan for Managing and Performing the Work (Weight 8) — Rates the
team's approach to address the technical issues on the project, methodology,
and task breakdown.
3. Staff Qualifications (Weight 10) — Rates team member's educational
background, professional qualifications, experience, and roles as they relate
to the Scope of Work for this project.
4. Related Experience (Weight 8)— Rates the team's recent experience on
applicable projects as it relates directly to the Scope of Work.
5. Team Organization and Use of Sub-Consultants (Weight 5) —Addresses
the appropriateness of assignments to consultant staff and/or Subconsultants
to consultant.
6. Proposed Schedule (Weight 5)—Rates the consultant's proposed schedule
as to understanding the schedule drivers and meeting the Sanitation District
needs.
The three (technical) proposals were evaluated and the ranking was complied on
January 10, 2006. Based on the evaluation reports received from the evaluators,
the three consulting firms were ranked according to the score achieved. The
following summarizes the attached ranking results for the three firms:
1. Earth Tech 415 points
2. Malcolm Pirnie 382 points
3. PBSU 378 points
The following is a summary of how the evaluation team collectively viewed the
top ranked firm:
Compiled scores ranked Earth Tech as the most responsive proposal.
The overall consensus was that the Earth Tech proposal indicated preview of the
existing tapes and good homework resulting in excellent understanding of the
scope of work and the Sanitation District's expectations. Their proposal showed
good understanding on remaining useful life, odor mitigation details, and pipe
measurements.
Their project approach indicated an appropriate level of Sanitation District
interaction, good breakdown of tasks, and appropriate selection of
Subconsultants. Their approach to project management is good.
The team's qualifications are good, consisting of two PhDs and their project team
shows substantial experience in working on similar projects and overall
Sanitation District procedures.
The proposed schedule shows a clear understanding of Sanitation District's
expectations.
Fee Proposals
On January 11, 2006, the technical proposals, Evaluation Team rankings, and
the sealed fee proposals were presented to the Engineering Management for
review and the sealed fee proposals were opened. The fee proposal summary for
each of the consultants is as follows.
• Earth Tech $699,096
• Malcolm Pirnie $723,088
• PBSBJ $850,807
The overall fees proposed by Earth Tech are well within the approved consultant
budget. Additionally Earth Tech has shown a thorough understanding of the
project, including the Sanitation District's expectations in terms of prioritizing the
repairs, evaluation of different methods of repairs and cost analysis, and an
engineer's estimate for repairs. Staff believes that Earth Tech's team has
extensive experience, and have proposed the project methodology that is
accompanied by quality assurance and quality control program.
Previous Change Order Performance History with the Sanitation District
Since the recommended consultant has not completed any design projectgs for
the Sanitation District, there is no previous change order history.
Recommendation
Staff recommends that Earth Tech be awarded the Professional Services
Agreement (PSA), for the services for Rehabilitation of Magnolia Trunk Sewer
(Condition Assessment Study), Contract No. 3-58, for a total fee not to exceed
$699,096.
TABLE 1
TECHNICAL PROPOSAL EVALUATION
Consultant Earth Tech Malcolm PBSBJ
Evaluator Pirnie
Reviewer A 386 338 350
Reviewer B 391 394 358
Reviewer C 455 388 414
Reviewer D 429 406 388
Total Score: 1661 1526 1510
Average Score: 416 382 378
Ranking: 1 2 1 3
TABLE 2
FEE PROPOSAL EVALUATION
Consultant Earth Tech Malcolm PBS&J
Pirnie
Total Hours (including 3599 3128 3280
major Subconsultants
Total labor Fee (include. $440,834 $562,067 $718,578
major Subconsultants
Average Labor Rate $123/hour $180/hour $219/hour
Total Direct Costs $34 250 $67,639 $42,175
Minor Subconsultants $224,012 $93,382 $90,054
Total Fees: $698 086 $723 088 $860,807
Ranking: 1 2 3
EDMS:003805347
PDC COMMITTEE -0eetlng Dale TO ad.or De.
` 1 03/02/06 03/22/06
Yd AGENDA REPORT .Number Item Number
PD006-19 13! 1
Orange County Sanitation District
® Xeadwerks
FROM: David Ludwin, Director of Engineering
Originator: Wendy Sevenandt, CIP Project Manager
SUBJECT: HEADWORKS REHABILITATION/REFURBISHMENT AT PLANT NO. 1,
JOB NO. P1-71
GENERAL MANAGER'S RECOMMENDATION
Approve a Professional Services Agreement with Carollo Engineers for studies and a
preliminary design report for Headworks Rehabilitation/Refurbishment at Plant No. 1,
Job No. P1-71, for an amount not to exceed $339,738.
SUMMARY
• The purpose of this project is to conduct studies and prepare a preliminary design
report for the:
1. Replacement of the Variable Frequency Drives (VFDs) for the four Main
Sewage Pumps (MSPs) in the Plant No. 1 Headworks No. 2 Facility.
2. Replacement of the single speed drive for one MSP with a new VFD.
3. Upgrade the installation of the electrical circuits (conductors, raceways, cable
trays, etc.) for the drives per electrical codes and safety standards.
• Staff requested proposals from five firms, with two firms responding.
• Staff evaluation ranked Carollo Engineers as the most qualified for this work.
• Staff negotiated a fee of$339,738 for preliminary design services.
• Staff recommends award of a Professional Services Agreement to Carollo Engineers
for an amount not to exceed $339,738.
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
Please see the attached Budget Information Table. This authorization request is for
$339,738 for consultant services for Phase 2, Preliminary Design Phase, of the project.
Page 1
BUDGETIMPACT
® This item has been budgeted. (Line item: Section s-page 49 ) i
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
A budget increase of$469,000 is proposed for the preliminary design phase. This
increase will allocate sufficient funding for the Professional Services Agreement with
Carollo Engineers for preliminary design and increases the current estimate for internal
staff and overhead costs. The actual costs for Phase 1 were lower than estimated
leaving $41,000 available to transfer from Phase 1 to Phase 2. The remaining funds
are available to transfer from the construction phase, Phase 4. The construction costs
will be lower based on current estimates. A total project budget increase is not
required.
ADDITIONAL INFORMATION
All flow entering Plant No. 1 passes through the Headworks No. 2 facility. Construction
of Headworks No. 2 at Plant No. 1 was completed in 1990. Four VFD pumps were
installed to pump all sewage after passing through the bar screens to the grit chambers.
Each pump has the capacity of 70 million gallons per day. Under a subsequent project,
a fifth constant speed pump was added.
The VFDs that regulate the Headworks pumps have reached the end of their useful
lives and replacement parts can no longer be obtained. The single speed drive will be
replaced with a VFD for consistency in equipment, flexibility in operations, and better
performance from a control standpoint. The ability to vary the speed of all pumps will
have tremendous benefit when the new Ellis Pump Station pumps sewage to
Plant No.1.
The primary focus of the work is the replacement of the VFDs. Additionally, the wiring
between the electrical distribution gear, the VFDs, and the pump motors needs to be
upgraded to meet current codes and standards.
Under the preliminary design phase, Carollo Engineers would conduct engineering
studies, present findings and recommendations in workshops with Orange County
Sanitation District (Sanitation District) staff, and assemble information and
recommendations in a preliminary design report. Under this Professional Services
Agreement, Carollo Engineers would perform the following tasks:
• Conduct a study to investigate current VFD technology, compare the technology
to the Sanitation District engineering standards, determine which VFDs will be
acceptable, and ensure acceptable VFDs will fit in existing electrical room space.
• Subcontract with a testing firm to conduct physical tests and evaluate the existing
15 year old motors to ensure they will be compatible with new VFD technology
and estimate the remaining useful life of the motors.
• Determine the design and construction effort to include bypass starters for the
new VFDs. Bypass starters allow pump to run in the event its VFD fails.
• Determine the design and construction effort to physically separate critical loads
in Power Building 3A by creating separate rooms for the "A" and "B" side
electrical loads.
Page 2
t • Evaluate instrumentation and control changes necessary to accommodate the
., new VFDs and bypass starters.
r • Conduct a routing study to determine the most feasible way to route power and
control wires through the congested tunnels and coordinating this effort with the
cable tray clean-up project, Job No. J-47.
• Develop a preliminary construction sequencing plan to schedule and address
operational constraints to minimize impact to plant operations.
• Develop a preliminary construction cost estimate and schedule.
Staff solicited proposals for studies and a preliminary design report. See the attached
Staff Evaluation of Proposals to Provide Engineering Services for the analysis and
results of the proposal review.
Carollo Engineers was selected based on the following:
1. Local staff who are highly experienced with our Headworks facilities and electrical
systems which will reduce the time commitment that would be required of the
Sanitation District's staff to support the consultant's investigative work.
2. A thorough understanding of the project, including recognition that project schedule
and construction sequencing are critical aspects of the project to support the
construction activities associated with the new Headworks at Plant No. 2.
3. A comprehensive knowledge of the technical issues and a creative cable
replacement approach that has the potential to reduce project risk and schedule
and save cost.
4. A construction sequencing/scheduling approach to maintain operations during
construction.
Staff plans to go through another consultant selection process for Phase 3, final design.
ALTERNATIVES
There are no alternatives to replacement of the VFDs. Replacement parts cannot be
obtained for the VFDs.
CEQA FINDINGS
This project rehabilitates existing facilities and is categorically exempt. A Notice of
Exemption will be filed.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Change Order Performance Report
4. Summary of Staff Evaluation of Proposals
WS:kf
W nlglobaMgenda Draft RepodsWDMP1-71 Agenda Report PSA awardatudyAm
Page 3
BUDGET INFORMATION TABLE
HEADWORKS REHABILITATION/REFURBISHMENT AT PLANT NO. 1
JOB NO. P1-71
PROPOSED
ORIGINAL CURRENT PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE' AUTHORIZED PROJECT BUDGET
INCREASE REVISED AUTHORIZED TO AUTHORIZATION TOTALEXPENDITURE EIWENOEII TO
= BUgGET BUDGET - BUDGET DATE REQUEST: AUTHORIZATION TO DATE DATE(%) :.
_ _. /DECREASE
Phase l-Project Development $ 67,718 $ 153.000 $ 41,000 $ 112,000 $ 112,000 $ 112,000 $ 112,000 100%
Phase 2-PreOmina Design $ 223,090 $ 126,000 8 469000 $ 595,000 $ 255,000 $ 339738 $ 594,738 5 152,000 26%
Phase 3-Design $ 1,954.3531 $ 513000 $ - $ 513,000 $ 264,000 $ 264.0001 S 13,000 5%
Phase 4-CwWudion $ 15.457,588 $ 3.688.000 $ 428101 $ 3,250,000 $ 530.000 $ 530,000 $ 11,000 2%
Phase 5-Commissionin $ 139,485 $ 34,OD0 $ - $ 34.000 $ 18,000 $ 18,000 $ 500 3%
Phase 6-Close-Out $ 34,814 $ 12,000 $ - $ 12,000 $ 11,000 $ 11.000 $ 0%
Phase 7-Centin en $ 2,880,952 $ 394,000 $ - $ 394,000 r $ $ - $ 0%
PROJECTTOTAL $ 20.758.000 S 4,920,000 $ - S 4,920.000 kl':1 S 1.190.000 1 $ 339,7381 $ 1.529,738 $ 288,500 19%
Reimbursable Casts
PROJECTNET $ 20,758.000 $ 4,920,090 3 - $ 4,920,000 1, 1 $ 1,190,000 3 339.738 $ 1.529.738 $ 288,500 19
PSAIContract
Desi n PSA S 1,300,000 $ 1.334.000 1 S 1,334,000 I d $ - S 339.738 $ 339,738
Construdion Contract $ 14,000.000 1 $ 1.820,000 1$ - $ 1,820,000 - $ - $ - $
EDMe: W37=73
Professional Services Agreement Status Report
Headworks Rehabilitation/Refurbishment at Plant No. 1
Job No. P1-71
Total Project Budget: $ 4,920,000
Consultant: Carollo Engineers
Start Date of Project: October 2004
Date Amendment Description Cost Accumulated
Costs
Conduct studies and prepare a preliminary design
Pending Original report for the replacement of drives for the 5 main
sewage pumps and miscellaneous electrical and cable
tray upgrades. $339 738 $339,738
ETAS: 003793870
DESIGN CONSULTANT CHANGE ORDER PERFORMANCE REPORT
HEADWORKS REHABILITATION/REFURBISHMENT AT PLANT NO.1
JOB NO. P1-71
Recommended Consultant:CAROLLO ENGINEERS
Project Category:PLANT REHABILITATION
CATEGORY CHANGE ORDER TYPES TRACKED
Perlarmancellaaeden Coratructlon Protects Reimbursable Design Non-Reimbursable Total Change Order Types
Completed to Date Unknown Conditions Errors Design Errors Tracked'
Program Performance Goals Plant Rehabilitation <3.00% 0.00% < 1.00% <4.00%
Consultant Performance History Plant Rehabilitation $368,144 0.85% $280.632 0.65% $269,605 0.62% $918,281 2.13%
Program Performance History Plant Rehabilitation $890.34 2.06% $145,216 0.34% $780,955 1.81% $1,816,518 4.21%
Consultant Performance History Plant Expansion $453,192 1.07% $306,408 0.72% $84,611 0.20% $844,201 1.99%
Program Performance History Plant Expansion $46,031 0.58% $0 0.00% $158.248 2.01% $204,279 2.59%
Consultant Performance History Collections $281,618 4.96% $0 0.00% $0 0.00% $281,618 4.96%
Program Performance Histo Collections $731 893 3.99%1 $0 0.00% $31,391 0.17% $763 084 4.16%
Consultant Performance History Composite $1,102,944 1.21% $586,940 0.54% $354,216 0.39% $2,044,100 2.24%
Program Performance History Composite $1,668,071 3.35% $145.216 0.29% $970,694 1.95% $2,783.881 5.60%
Program Performance Goals Composite <3.00% 0.00%1 4.00%
The Change Order Management Plan tracks the preceding three change order type:
Consultant Performance History reflects all projects including those prior to initiation of the PMO
EDMS#
T
Headworks Rehabilitation/Refurbishment at Plant No. 1
Job No. P1-71
Staff Evaluation of Proposals to Provide Engineering Services
The following consulting firms received Requests for Proposals:
• Black and Veatch
• Camp Dresser and McKee(CDM)
• Carollo Engineers
• Earth Tech
• HDR
Staff received two responsive proposals on November 30, 2005. They were from
Carollo Engineers (Carollo) and Earth Tech. Black &Veatch, CDM and HDR declined
to submit a proposal.
Proposals were reviewed in-house by a review panel from December 1, 2005 to
December 13, 2005. The review panel consisted of four staff members from Orange
County Sanitation District (Sanitation District) Engineering Department and Operations
Department. Each proposal was graded from 1 to 10 (10 being best) in eight areas
described below:
1. Identification of Proposer (Weight 2)—Certain information on the Consultant
and Subconsultants are required including location of offices.
2. Understanding of the Scope of Work (Weight 10)— Rates the Consultant's
understanding of the project's background, purpose, main issues and
interrelationship with other Sanitation District's projects.
3. Technical Approach (Weight 8)— Rates the Consultant's ability to address the
technical issues on the project and their approach to handling these issues.
4. Management Approach (Weight 5)— Rate the Consultant's project
management techniques and issues and the approach to performing the tasks.
5. Staff Qualifications (Weight 7) —A comparison of the team's educational
background and professional qualifications as they relate to the Scope of Work
for this project.
6. Related Project Experience (Weight 8) —A comparison of the companies and
team member's experience on similar projects.
7. Proposed Schedule (Weight 5)— Rates the consultant's proposed schedule as
to understanding the schedule drivers and meeting the Sanitation District needs.
8. Labor Hour Estimate (Weight 5)— Rates the Consultant's estimated level of
effort to conduct and complete each task.
9. Miscellaneous Requirements (Weight 2) — Rates the Consultant's ability to
meet the miscellaneous items requested to be submitted with the proposal.
After reviewing and grading the two proposals, the two consulting firms were ranked
according to the score achieved. The following summarizes the attached ranking
results for the three firms:
1. Carollo Engineers 1623 Points
2. Earth Tech 1541 Points
The following is a summary of how the evaluation team collectively viewed the firms:
Compiled scores ranked Carollo as the most responsive to the proposal. Reviewers
individually and collectively ranked Carollo as the most qualified to conduct the studies
related to the replacement of the motor drives for the main sewage pumps at
Plant No. 1 and associated cable tray and electrical improvements.
Carollo's extensive experience in the Headworks area of Plant No. 1 gave them the
edge in understanding how to approach the project work elements. Carollo performed
the original design for the original four Headworks variable frequency drive main
sewage pumps as well as the subsequently installed constant speed pump. With the
design of the constant speed pump, Carollo addressed similar cable tray issues that
are present with this new project. Carollo performed electrical studies for the
Headworks area which gives them a better understanding of how the electrical system
is currently configured and the work that must be completed to ensure reliable circuitry
to the pumps and drives.
The two consultants possess recent variable frequency drive (VFD) design
experience, although Carollo has more current VFD experience with the Sanitation
District. The complexity of the project stems more from having to route power
conductors between the drives and pumps through congested tunnels. Carollo
addressed more specific technical issues regarding the connection of the existing
motors to new variable frequency drives than Earth Tech. A requirement of the scope
of work to provide a subconsultant to conduct a motor test of the existing motors was
not met by Earth Tech. The Earth Tech proposal was not clear in presenting their
approach to the motor study.
Carollo possesses the best understanding of the schedule requirements and flow
pumping constraints. Carollo has a high degree of understanding of the flows that
need to be pumped through the Headworks under different flow scenarios. This
allowed Carollo to better identify schedule constraints and risk.
e
Fee Proposals
On December 13, 2005, following final ranking of the technical proposals, the sealed fee
proposals were Opened. For each consultant, the proposed total fee for the studies to
be conducted in the Preliminary Design Phase of service is shown below, arranged in
the order of highest to lowest technical ranking.
Carollo $ 372,210
Earth Tech $ 333,994
Because the proposal review panel all ranked Carollo highest on the technical proposal,
the Sanitation District's Project Manager and Engineering Management elected to enter
into negotiations with Carollo to look for opportunities to reduce the total cost. One
meeting was conducted to discuss and refine the consultant's understanding of the
Scope of Work and confirm that each task was assigned the appropriate level of effort
and fee.
During the negotiation meeting between the Sanitation District project team and the
Carollo project team leaders, agreement was made that production of process control
and instrumentation drawings would not be needed for this phase of the work.
Negotiations led to a $32,475 reduction in the cost for the work for a total fee not to
exceed $339,735. Elimination of production of drawings reduced the hours needed for
lower level staff. The studies require more senior and experienced staff to go through
the thought process to determine the work needed and address design issues.
The Sanitation District project team feels that the lower hours (shown in Table 2) and
more senior staff demonstrates that Carollo has the knowledge and experience to
efficiently and effectively perform the work and eliminates hours needed for the learning
curve. The Carollo team is located in their Fountain Valley office. The Earth Tech team
is located in Lake Forest, Oakland and Wisconsin. For the studies, field investigation is
necessary and the local staff provided by Carollo is seen as a benefit to the project.
Overall Carollo requires fewer hours than Earth Tech to complete the work, benefited by
the experienced senior staff located nearby, although at a higher rate than Earth Tech.
Table 1 compares the ranking by each evaluator. Table 2 compares the final negotiated
level of effort and fee from Carollo and the proposed level of effort and fee from Earth
Tech. Staff recommends selecting Carollo because they provide:
1. A thorough understanding of the project, including recognition that project
schedule and construction sequencing are critical aspects of the project to
support the construction activities associated with the new Headworks at Plant 2.
2. A comprehensive knowledge of the technical issues and a creative cable
replacement approach that has the potential to reduce project risk and schedule
and save cost.
3. A construction sequencing/scheduling approach to maintain operations during
construction.
4. Local staff who are highly experienced with the Headworks facilities and
electrical systems which will reduce the time commitment that would be required
of the Sanitation District staff to support the consultant's investigative work.
Staff categorizes this project type as "plant rehabilitation". The following summarizes
Carollo's change order performance:
• Carollo's change order performance on a plant rehabilitation type of project for all
categories of change orders tracked is 2.13% as compared to the program
performance history of 4.21%.
• For all project types (composite), Carollo's overall change order performance is
2.24% for all change orders as compared to the performance history of 5.60%
and performance goal of 4.00%. Carollo's overall performance is well within the
program performance goals.
• Carollo's reimbursable design errors type change order performance at 0.65% for
plant rehabilitation type projects is above the program average of 0.34%.
• The Design Consultant Change Order Performance Report is attached for
additional details.
Earth Tech has no performance history with the Sanitation District.
This PSA will be for a study only. Performing this study first, before requesting the
consultant to propose on the final design costs, will help to lower potential change
orders.
Staff recommends that Carollo be awarded the PSA, for Studies and a Preliminary
Design Report for Headworks Rehabilitation/Refurbishment at Plant No. 1,
Job No. P1-71, for a total fee not to exceed $339,735.
TABLE 1
HEADWORKS REHABILITATION/REFURBISHMENT AT PLANT NO. 1
JOB NO. P1-71
Consultant Carollo (1) Earth Tech
Evaluator 2
Reviewer A 353 352
Reviewer B 340 330
Reviewer 455 407
Reviewer D 475 452
Total Score 1 223 1 441
Average Score 406 385
Rankin 1 2
TABLE 2
HEADWORKS REHABILITATION/REFURBISHMENT AT PLANT NO. 1
JOB NO. P1-71
Consultant Carollo Earth Tech
(Negotiated)
Total Hours 1901 2603
Incl. major Subconsultants
Total Labor Fee $ 309,638 $ 322,744
Incl. major Subconsultants
Average Labor Rate $ 163/hour $ 124/hour
Direct Costs $ 5 100 $ 11 250
Minor Subconsultants $ 25,000 0
Total Fees $ 339 738 $ 333 994
WS:ba:kf
EDM3:003804631
PDC COMMITTEE " enyD� TeBa•agr
03/02/06 03/22/06
y AGENDA REPORT teem Number Item Number
PDC06-20 13 a
Orange County Sanitation District
MUtility Systems
FROM: David Ludwin, Director of Engineering
Originator: Mike Puccio, CIP Project Manager
SUBJECT: CABLE TRAY IMPROVEMENTS AT PLANT NOS. 1 & 2,
JOB NO. J-47
GENERAL MANAGER'S RECOMMENDATION
Approve a Professional Services Agreement with Camp, Dresser& McKee, Inc. for
engineering services including Design-Build bid document preparation for Cable Tray
Improvements at Plant Nos. 1 & 2, Job No. J47, for an amount not to exceed
$2,251,548.
SUMMARY
• The purpose of this project is to bring cable tray systems at Plant Nos. 1 and 2
into compliance with code requirements, improve the reliability, and improve the
safety of these systems.
• Requests for proposal were sent to nine engineering firms. One of the nine
engineering firms provided a proposal to the Orange County Sanitation District
(Sanitation District). The proposal was evaluated in accordance with defined
Sanitation District procedures and staff recommends the approval of the PSA to
Camp, Dresser, & McKee, Inc.
• The eight firms that did not submit a proposal provided a variety of reasons but
the most common was the lack of available specialized electrical staff required
for this project. This project requires a large team of electrical engineers and
electricians. At the time of the proposal, many of the consultants' electrical staff
were committed to other projects. Another reason given for not submitting a
proposal was the firms made a business decision to pursue the Design-Build
(D-B) contracts that will result from this project.
• Once the design is complete and the scope of construction is defined, staff plans
to request additional funding for consultant services to support staff during
Phase 4 (Construction), Phase 5 (Commissioning), and Phase 6 (Close-Out).
PRIOR COMMITTEE/BOARD ACTIONS
None.
Page 1
PROJECT/CONTRACT COST SUMMARY
Please see the attached Budget Information Table. A total of$2,251,548 for consulting
services is requested for authorization. A total project budget increase is not required.
BUDGET IMPACT
® This item has been budgeted. (Line item- 2005/2006 CIP Budget, Sector,s,Page 76)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Cable tray systems have been used in the United States for nearly 50 years and at the
Sanitation District for nearly 40 years. Cable tray systems are installed in buildings and
utility tunnels at Plant Nos. 1 and 2 to support multiple runs of power, control, and
signal cables. Tray systems offer a cost-effective alternative in some situations to
large racks of electrical conduit.
Since the first introduction of cable tray, the committees of the National Electrical Code
(NEC) began to stipulate specific installation and use requirements. As industry
experience was gained, these NEC requirements were increasingly tightened in order
to improve the safety and reliability of tray installations.
At present, many of the older tray systems at Plant Nos. 1 and 2 are not in compliance
with current NEC requirements:
• Some trays are overfilled with cables.
• Some trays have cables and wires that are not permitted by the NEC for use in
trays.
• Some of the cables not permitted for tray use have deteriorated due to sun
exposure.
The Consultant's work will include:
1. Perform a comprehensive, detailed field survey of existing tray conditions at
Plant Nos. 1 and 2.
2. Recommend corrective actions for conditions needing remediation.
3. Establish cable tray system installation standards for all subsequent projects.
4. Propose subdivisions of the remediation work in coordination with existing CIP
projects underway.
5. Propose separate remedial Design/Build projects for those locations not covered
by existing CIP projects.
The scope of work includes preparation of"low-bid"type D-B bid documents and
Request For Qualification (RFQ) documents. The RFQ process will be used to
pre-qualify D-B teams and to test the market for the D-B approach.
a. .., ..1. Page 2
The D-B approach is being recommended for this project for the following reasons:
• Transfer of risk to Contractor by eliminating staff requested and design error type
change orders.
• Reduce design costs, including staff time, by moving the detailed design to the
Contractor delivered as-builts eliminating costly investigations, reviews and
drawing preparation.
• Control over designer is not critical since the project is mainly for code
compliance.
Currently staff is evaluating other D-B delivery methods including "best-value". This D-
B method would require legislation to amend the Public Contracting Code. If"best-
value" type D-B is available within the time frame of this project it will be evaluated.
ALTERNATIVES
The Sanitation District could consider not approving the project, in which case, cable
conditions would continue to deteriorate until failures occur which could cause personal
injury and/or process disruption, depending on the location of the failures.
CEQA FINDINGS
This project was included in the Subsequent Environmental Impact Report (EIR)to the
1999 Strategic Plan Program EIR.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Summary of Staff Evaluation of Proposals
MP:ba:kf:eh:ba
HAn&WRAgenda Doak RepOnsIPDDWR J47 PSA.dm
a Iw W Page 3
BUDGET INFORMATION TABLE
Cable Tray Improvements At Plant Nos. 1 &2
JOB NO.J-47
6AUTHORMED
CURRENT PROPOSED PROPOSED' FUNDS 11413 PROPOSED ESTIMATED ESTIMATED
PROJECTIPHASE PROJECT BUDGET REVISED AUTHOWZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENOED TDINCREASE
BUDGET R)ECREASE BUDGET DATE REQUEST.. AUTHORIZATION TODATE DATQ%)
Phase 1-Pro ed Develo men! $ 28,094 $ 28.094 $ 28 094 $ 28,094 S 29.894 106%
Phase 2-Prelimina Desi n $ 3319182 S 3319.182 S 819,182 It 2251548 $ 3.070730 $ 245,242 8%
Phase 3-Desi n $ 2.752.000 $ 2676760 1 S 2.576.750 $ 984,750 i S 984,7501 S 198.680 20%
Phase 4-Construction S 28503000 S 25,713775 $ 25,713778 S 3167618 $ 3,167518 $ 813.120 26%
Phase 5-Commissionim $ 374.000 $ 373.693 $ 373693 $ 345,990 $ 345,99D $ 4313 1%
Phase 6-Close-Out $ 95000 $ 95.231 $ 95231 S 88305 $ 88.3D5 S 2.885 3%
Phase 7-Continpanw S 4,950.000 $ 4950045 S 4,950,D45 S 4950045 $ 4950.045 $ 0%
PROJECT TOTAL $ 37,057,000 $ 37,056.773 $ 37,056.773 $ 10.383,884 $ 2.251.548 $ 12,635,432 $ 1.294,134 10%
Reimbumable Costs
PROJECT NET S 37.057,000 $ 37.056.773 $ 37,056,773 S 10,363,884 TS 2,251,548 $ 12,635,432 1 $ 1,294.134 1 10%
PSAIContract
Design PSA S 4,092,0001 $ 4,092,000 $ 2.251.5481 $ 2 251 548
Corelmdion Contied $ 21961.384 1 $ 21.961,384 $ - $
EDMS,00380CPo
Professional Services Agreement Status Report
Cable Tray Improvements at Plant Nos. t & 2
Job No J-47
Total Project Budget: $37,056,773
Consultant: Camp, Dresser& McKee, Inc.
Start Date of Project: Pending
Date Amendment Description Cost Accumulated
Costs
Engineering services cable tray improvements
Pending Original PSA including study and preparation of design build $2,251,548 $2,251,548
documents.
EDMS:003BD4989
Revised 05M V98
Cable Tray Improvements
Job No. J-47
Summary of Staff Evaluation of Proposals
The following consulting firms received Requests for Proposals:
• Black & Veatch Corporation
• Brown & Caldwell
• Camp Dresser & McKee Inc. (CDM)
• Carollo Engineers
• EarthTech
• HDR Engineering
• MWH
• Spec Services
• Washington Group International
Black & Veatch, Brown & Caldwell, Carollo, EarthTech, HDR Engineering, MWH,
Spec Services and Washington Group International declined to submit a
proposal. As a result, there was one responsive proposal received on
January 19, 2006. Proposals were reviewed in-house by a review panel from
January 20, 2006 to February 2, 2006. The review panel consisted of
5 members. The proposal was graded from 1 to 10 It being best) in
6 categories described below:
1. Technical Approach (Weight 8) - Rates the Consultant's ability to address
the technical issues on the project and their approach to handling these
issues.
2. Management Approach (Weight 2)- Rates the Consultant's project
management techniques and issues and the approach to performing the
tasks.
3. Staff Qualifications (Weight 4)- Compares the Consultant's team's
educational background and professional qualifications as they relate to the
Scope of Work for this project.
4. Proposed Schedule (Weight 3)- Rates the Consultant's proposed schedule
as to understanding the schedule drivers and meeting the Sanitation District's
needs.
5. Labor Hour Estimate (Weight 5)- Rates the Consultant's estimated level of
effort to conduct and complete each task.
6. Project Experience (Weight 4) - Rates the Consultant's and team members
experience and expertise.
After reviewing and grading the proposal, the results were summarized in Table
1.0 below.
The following is a summary of how the evaluation team collectively viewed the
top ranked firm:
• The Cable Tray Improvement Project is unique since it requires the
consultant to provide numerous field personnel to inspect the cable tray
systems and provide recommendations for improvement. This field
activity is for a relatively short time. CDM has the team required for this
task by utilizing their construction staff.
• CDM has been actively pursuing the project for over six months and have
gained an in-depth understanding of the project requirements.
• The CDM project manager has similar experience replacing electrical
equipment and wiring on a large water treatment facility in Salt Lake City.
• CDM has extensive experience with design-build delivery methods.
• CDM is familiar with the Sanitation District CIP schedules to ensure cable
tray work does not interfere with ongoing projects.
Fee Proposals
On February 2, 2006, following final review of the technical proposal and
management review/acceptance of the review, the sealed fee proposal was
opened. The total fee was $2,299,360.
The Sanitation District's staff met with Camp Dresser & McKee Inc. to clarify the
requirements of the Scope of Work. Based on these meetings, the fee was
reduced from $2,299,360 to $2,251,546 based on consolidation of workshops
and elimination of tasks. Staff believes this fee is reasonable for the work
required.
Man-hour and cost data is presented in Table 2.0.
Previous Change Order Performance History with the District
Since the recommended consultant, CDM, has not completed any design
projects for the Sanitation District, there is no previous change order history.
Recommendation
This project requires a large team of electrical engineers and electricians. The
eight firms that did not submit a proposal provided a variety of reasons but the
most common was the lack of available specialized electrical staff required for
this project. Most of their electrical staffs have been committed to other projects.
Another reason given for not submitting a proposal was the firms made a
business decision to pursue the design/build contracts that will result from this
project.
The consultants that received RFPs were large national firms and one local
smaller firm. Staff recommends to not proceed with another RFP process, since
the candidates would be smaller firms who would have even more serious
electrical staff limitations, and less design build experience.
Staff recommends that CDM be awarded the Professional Services Agreement
(PSA) for engineering services for Cable Tray Improvements at Plant No. 1 & 2,
Job No. J47, for a total negotiated fee not to exceed $2,251,548.
TABLE 1.0
STAFF EVALUATION SUMMARY
Consultant CDM
Evaluator
Reviewer A 216
Reviewer B 192
Reviewer C 200
Reviewer D 195
Reviewer E 209
Total Score 1012
Average Score 202
Ranking 1
TABLE 2.0
COST PROPOSAL SUMMARY
Consultant CDM
(Negotiated)
Total Hours
Prime 17,456
Total Labor Fee
Prime $2,152,678
Avera a Labor Rate $123/hour
Direct Costs $98,570
Subconsultants $0.00
Total Proposed Fee 1 $2 251 548
EDMS-OD3805180
PDC COMMITTEE M nq Date TOnd.Or Dir.
03/02/N 03/22/06
AGENDA REPORT Item Number 10em Num e
GDC0621 13(e)
rtO
.rraannge County Sanitation District
U11. Collections
Facilities
FROM: David Ludwin, Director of Engineering
Originator: David May, Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION, JOB NO. 1-24
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the Professional Services Agreement with Malcolm
Pirnie, Inc. providing for construction support services for the Bushard Trunk Sewer
Rehabilitation, Job No. 1-24, for an additional amount of$137,937, increasing the total
amount not to exceed $223,045.
SUMMARY
• In February 2006, a Professional Services Agreement (PSA) was awarded by the
General Manager on a sole source basis to Malcolm Pirnie, Inc. (MPI) for a not to
exceed amount of$85,108, MPI performed all work scope required in the contract in
December 2005 and early January 2006.
• The construction document and bid package prepared by MPI and staff advertised
for bidding on January 3, 2006. Bids were accepted on February 2, 2006 and a
contract awarded on February 22, 2006. A Notice to Proceed is expected to be
issued in mid-March 2006.
• The construction work is scheduled aggressively and needs quick response.
Malcolm Pirnie and staff have agreed upon a scope of work for construction
services. The scope of work consists of submittal reviews, responses to requests for
information from the contractor, and response and contract document changes as
directed by staff.
PRIOR COMMITTEEIBOARD ACTIONS
See attached PSA Status Reports for Boyle Engineering and Earth Tech Inc. for
engineering and construction services contract status.
Construction Job No. 1-24 with Steve P. Rados was awarded June 26, 2002 and totals
$35,710,113 through Change Order No. 17.
Procurement Contract No. 1-24P with Ameron International was awarded September
28, 2005 and totals $7,699,777 with no change orders to date.
Page 1
Construction Contract No. 1-24A was awarded to Mike Bubalo Construction, Co., Inc.
on February 22, 2006 for intersection construction work.
PROJECTICONTRACT COST SUMMARY
See attached Budget Information Table.
BUDGETIMPACT
® This item has been budgeted. (Line item: 2005-06 Budget Book, page 8-47)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
In fall 2005, Boyle Engineering Corp. and MPI assisted the Orange County Sanitation
District (Sanitation District) with the preparation of an RFP to Steve P. Rados for
additional intersection work items. A proposal from Steve P. Rados was received but
was not accepted by staff. Subsequently, MPI was awarded a sole source PSA to
assist the Sanitation District with development of bid documents. These bid documents
were advertised for competitive bids on January 3, 2006.
Bids were accepted and opened on February 2, 2006. After bid evaluations, staff
recommended the low responsive and responsible bidder to the Board. The Board
awarded the contract to the recommended bidder on February 22, 2006. This
contractor is currently submitting insurance certificates and endorsements, as well as
bond certificates for Sanitation District approval prior to being issued a Notice to
Proceed. The Notice to Proceed is expected to be issued in mid-March 2006.
The construction contract was awarded based on an aggressive schedule. The contract
includes both bonus incentives for early completion and large liquidated damage
penalties for late completion. Response to contractor submittals, RFPs, and any design
changes must be made quickly. The design engineer of record is desired to help review
submitted documents and questions, and to quickly respond to requested document
changes.
Staff received a proposal from MPI and negotiated the scope of work and fees. Staff
believes the scope and fees are appropriate for the requested tasks.
ALTERNATIVES
Do not approve the amendment. Staff would either review all incoming documents
versus contract documents and make determinations; or, staff could hire an alternate
consultant to review all incoming documents versus contract documents to make
determinations. Neither alternative is as desirable as having the engineer of record
perform the reviews and changes.
Page 2
'v CEQA FINDINGS
The Program Environmental Impact Report was certified in 1999 by the Board of
Directors. Addendum No. 8 to the Program EIR was certified at the February 2006
Board meeting.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Malcolm Pirnie Proposal
DM:ba:eh
HinlglobaMgenda Draft ReW lsWDU 2AA MPI PSA AMENDMENT ldo
Page 3
P a n
BUDGET INFORMATION TABLE
Bushard Trunk Sewer Rehabilitation
JOB NO. 1.2-4
ORIGINAL CURRENT PROP08E0PREVISED FUNDS 'IR19 EXPENDITURE
TEO XPIENIEDTO
BUDGET PROPOSED TOTAL
PROJECTNMA9E. AIITNDIU2FJ1 PROJECT REVISED AUIHORIZEO TO AUINORIEATION EIITO DATE EXPENDED TO
EUDOET BUD, BUDGET GATE -r REQUEST ON TO DATE DATE(%.),
SET IOEC EASE INCREASE AUTHORIZATION Y .(,liluVl h
Phase l-Proed Dmel mend $ 74,000 $ 74,000 $ 74,000 S 74.000 $ 74,000 S 74,575 101%
Phase 2-Prellmina Design $ 10000 S 10.000 $ 10000 $ 10.000 $ 10000 $ 9161 92%
Phase 3-Deal n $ 2168000 5 2,168,000 S 2.168.000 $ 2.168,000 $ 2.168.000 S 2.174.531 100%
Phase 4-Canseud.. $ 48142000 $ 50.142,0N0 $ 131937 $ 58,279937 $ 49.394962 $ 137937 $ 49.532899 S 25,527306 52%
Phaaa 5-CommuvonM $ 416.000 $ 416.00D S 416.000 $ 326.000 S 326.000 $ 251.509 ]7%
Phase 6-ClowOvt $ 72,000 $ 72,000 S 72.000 '' $ 40,000 S 40.000 S 1.657 4%
Phase 7-ContiWency S 2.698000 S 2.698,000 E 13]93] S 2560,063 $ 2,698.000 $ 13]93] $ 2.560.063 0%
PROJECT TOTAL $ 53.580.000 6 63,500,000 3 - E 63,S80,000 $ 54.710,962 S - $ 54.710,862 $ 28,038,739 51%
Reimbursable Costs
PROJECT NET $ 53,580,D00 1 $ 63,580.000 1 S - $ 63,580,000 " $ 54,710.962 $ - $ 54.710,962 $ 2,038,739 51%
PSA/Contract
Design PEA 0 845300 $ 2.467.825 $ 2.467.825 $ 2.467.825 $ 2,467825 $ 2,166,745 88%
CM PSA $ 2,000000 E $ 2052,593 =1 $ 2.052.593 $ 2,052693 S 0%
Consullanl 1-24A $ - $ 65108 $ 137937 $ 223045 $ 85,108 $ 137937 $ 223,045 $ 85000 38%
Pi eProwrement-l-24P $ - S 7699777 $ 7.699.777 $ 7,699777 $ 7699,777 $ 0%
Construction Conlract-Rados $ 30.260934 $ 323 IJ39 $ 3244139 S 32,264139 $ 32254,139 S 16247,398 50%
CSom Co 0%tc -1-244 00 50
ouNarneibraHison - S 3
$ 350.000 171$ 350,0001 $ 350,000 1 S 0%
EDMS:003e050P
Professional Design Services Agreement Status Report
Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Total Project Budget: $63,580,000
Consultant: Malcolm Pirnie, Inc.
Date Amendment Description Cost Accumulated
Costs
Assist OCSD with preparation of contract bid
12/16/06 Original PSA documents for Contract No. 1-2-4A for the Ellis $85,108 $85,108
and Bushard Intersection work.
Pending 1 Amend PSA to add construction services support $137 937 $223 045
EDMS.003805016
EXHIBIT A
80CI Irvine CcnIN Dnve
Suite 1100
1l im CA 926'a
T.949450'%01
F.949 4509902
wwwpftw mn
February 7,2006
Mr. David May,P.E.
Project Manager
Orange County Sanitation District
P.O. Box 8172
Fountain Valley,CA 92728-8127
Re: Job No. I-2-4A
Bushard Trunk, Sewer Rehabilitation
Ellis and Bushard Intersection
Amendment No. 1 to the Professional Services Agreement
Dear Mr. May:
Enclosed please find a copy of Amendment No. 1 to the Professional Services Agreement
on the above referenced project. Amendment No. I includes the following changes to the
scope of services:
• Scbedule A—Construction Phase Services
The total amount for these changes is 8137,937 and we have provided a breakdown in the
attachment. If you have any comments or questions regarding this information, please let
us know.
Very truly yours,
MALCOLM PIRNIE,INC.
�\ �\r\ —
Josep N. ,P.P.E.
Projec M ager
1-2-4A A wdmrnt 1 LOT 2-7-06.d.
Fncloum
7788-M
SCOPE OF BASIC ENGINEERING SERVICES
JOB NO. I-24A
BUSHARD TRUNK SEWER REHABILITATION
ELLIS AND BUSHARD INTERSECTION
SCHEDULE A—CONSTRUCTION PHASE SERVICES
The Scope of Basic Engineering Services to be provided by CONSULTANT includes
Construction Stage services for Job No. 1-2-4A Bushard Trunk Sewer Rehabilitation—
Ellis and Bushard Intersection The following is a summary of the task understanding
and the scope of work to be completed.
TASK BACKGROUND:
The Orange County Sanitation District(OCSD)selected the services of Malcolm Pimie
Inc.for this effort. The effort is to assist the OCSD with construction phase of this
project The OCSD intends to bid the Bushard/Ellis intersection work in late January
2006. The following is a summary of the requested services that will be required.
SCOPE OF WORK:
Goals and Objectives:
• Assist 0CSD with construction stage services
• Upon request attend progress meetings with OCSD and the Contractor.
• Provide technical support including shop drawing reviews,responses to Request for
Information (RFI)from the Contractor,and reviews of proposed change orders by the
Contractor.
L Scope of Work Assumptions:
A. Pre-twnstruction Conference: One 4-hour meeting
B. Biweekly Construction Conf: Ten(10) meetings(4 hr ea)
C. Telephone Consultation: Four(4) hours per month (9 months)
D. Monthly Field Consultation: nine(9) visits (4-hrs per visit)
E. Submittal Reviews: 25 submittals at 4 hours each
15 re-submittals at 2 hours each
F. Request For Information(RFI) 25 RFI's at 4 hours each
G. Change Order Reviews(CO): 6 at 4 hours each
H. O&M Manual Review: 5 at 8 hours each
I. Programming/database reviews: 5 at 8 hours each
J. Preparation of record drawings: 200 hours
K. Management of sub-contractors: 40 hours
0>8&r!5
1-2-4A Elk,a D-Wd Inmrxenian W.,k achedule A.d , Page I of4
D. Pre-construction Conference:
A. Malcolm Pimie will attend the pre-construction Conference. Meeting
minutes will be completed by OCSD.
III. Biweekly Construction Conference:
A. Malcolm Pimie will attend the Biweekly Construction Conferences upon
request.
IV. Telephone Consultation:
A. Malcolm Pimie will be available by phone to answer questions.
V. Monthly Field Consultation:
A. Malcolm Pimie will visit the site each month. Malcolm Pimie will
provide a written report after each visit. Digital photos will be included in
the report.
VI. Submittal Reviews:
A. Malcolm Pimie will provide review of shop drawings submitted by the
Contractor upon request by OCSD.
B. Malcolm Pimie will mark-up each shop drawings and provide review
comments in accordance with the Contract Documents. Review will be
based on the requirements on the drawings and specifications.
VII. Request For Information (RFI):
A. Upon receiving an RFI request from OCSD,Malcolm Pimie will review
and respond to the RFI and return to OCSD for transition to the
Contractor.
B. Malcolm Pimie will respond to each RFI within five(5)working days.
C. Responses will be completed in Microsoft Word.
VIII. Change Order Reviews(CO):
A. Upon receiving a CO request from OCSD, Malcolm Pimie will review for
technical aspects and provide a recommendation.
B. Malcolm Finnic,has not included budget to prepare any change orders
including sketches, drawings, or scopes for changes.
C. Malcolm Pimie will respond to each CO within fifteen(15)working days.
orrr-rr5
424A Ellis&Bushard Isnersecrien Work Schedulc A.doc Page 2 of4
DL O&M Manual Review:
A. Malcolm Pimie will review O&M Manuals upon request by OCSD.
B. O&M Manuals are to be Manufacturer Supplied O&M Manuals only.
Malcolm Pimie has not budgeted time to create specific Facility O&M
Manuals for this project.
X. Programming/database Review:
A. Malcolm Pimie will review the programming/database upon request by
OCSD.
XL Preparation of record drawings:
A. Upon receiving the Contractor's Record documents,Malcolm Pimie will
update the drawings and specification files and submit to the District for
approval.
B. Malcolm Pimie will complete this task within forty 40 working days.
C. Malcolm Pimie will provide a Draft and Final Submittal of the documents
for review by OCSD.
D. Deliverable:
1. Draft Submittal: Five copies of half size drawings and
specifications(bond paper).One CD-ROM with electronic files
and PDFs of all documents.
2. Final Submittal:Five copies of half size drawings and
specifications(bond paper).One copy of full size drawings on
mylar for record.One CD-ROM with electronic files and PDFs of
all documents.
XII. Management of Sub-Consultants:
A. Malcolm Pimie will require one sub-consultant for this phase of the work.
Lee& Ro, Inc.will be responsible for the electrical and instrumentation
reviews,RFIs,and COs.
Drams
42-4A Eais&fisl dImcsusiien Wok Sc J.kA.d Page 3 of4
t
r
XIH. ASSUMPTIONS:
A. Contract time for this scope of work will end on December 31,2006.
B. O&M manuals per EDG's will not be provided.
C. Start-up Services are not included in this scope.
D. Training Services are ILot included in this scope.
E. Monthly reports will not be provided for this work.
F. Preparation of conformed documents is not included in this scope.
G. Traffic Control is not included in this scope of work.
H. Design work completed by Boyle Engineering is not included in this
scope.
1. No additional permits or permit applications are required.
J. No attendance at Board or other public meetings will be required.
K. Meeting minutes will not be provided by Malcolm Pimie.
one 175
I-24A Ellis&Bmhenl lnausalion Work Schedule A.doc Page 4 of4 .
r
EXHIBIT A 11
3
TABLE 1.0
SCOPE OF WORK
SUMMARY OF COSTS
BUSHARD TRUNK SEWER REHABR.IATION
ELWS AND BUSHARD INTERSECTION-CONSTRUCTION STAGE SERVICES
VBORCVSBIFICA)IONB TOTAL
Teo I I m-C I E'/S-B I E A LNS-6I P z I T/A-] I T/A-3 HOURS
I PN0IECT iM3lGEMEM
EUEpeI(el engBmnenl 1 e B I
Ne eM 3< 40 B )
S w t O ?s SB B 0 0
II MSN entl40e VIe0e
Tsmb0uNm GNama A e e 1
OMeeOy Cuumvlm CaRgwo B e0 w
Fabb W N b
BUNNLI 13 SO w 0 O I
ul CUbullLen,RMFUeeM RM
T Cenw001bn 38
SOlbBU RNbNe 3 N 1 M 11
RFb B w Is
ONURmMa B 18 2
MUMqueU OBM MeruW ReNewe 0 m
/4uEou rwMxe
Sv01ofN 0 2e 112 tw 0 0 ]
54
N %epbellen W ReceN OmrNBs
Le[Y PIONtlIon 160 t
SBBFlratlov 18 w
suebw a o IB w IK o
Wl CONSTRUO)IONSTAOESEANICES 0BENE0OTATCOUNOERAFUNREAMENOMEN0
Tel11eBUNmn 13 23 a, IN 28B 1" 0 ]
BUNen Le0ar RebF 8eee0 an10000e1e S MOB 3 1w.00 S &SS S MR i e3:1B s NJI B 3.SB':
Tabl BOAen V - S` 1,7w S 2.4 i 21.110 3 10= i t;wi i' ]BM 7 130
oe Mm 93L0 S 1.BBS B 2.417 i mL34 Z S.AS 'S:11A16 3 7AN +S B 53A13
G BLS B 171 3 - 2w s MS $ S.Bm :S<I 3 m 3. "S"
SYBtw11e0Uh S S.BBS 3 - 5= S 4A2?2 $ M.= Si mABB i,. 3 3" 114
�:' EbbtW ilpoOMbn. .:: - .•. n._
kaw Mlmbfp= 63140mr $264
t TmWmeBuYWIOM-
Tell Eewnex s ]Sla
Buecee.uBenl:
lAe3R0,Nc S 1B,SW
TMtl 800CmHupenb:
Tell in
.1.
PDC COMMITTEE mee'M Date ro atl.or ar.
03/2/O6 03/12/05
AGENDA REPORT Item Number Item Number
PDC06-22 131Fl
Orange County Sanitation District
Dig scion& Handling
8 lids
FROM: Dave Ludwin, Director of Engineering
Originator: Pam Koester, Project Manager
SUBJECT: PLANT NO. 2 PRIMARY SLUDGE FEED SYSTEM PROJECT,
JOB NO. P2-91
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the Professional Services Agreement with Brown and
Caldwell for engineering services for Plant No. 2 Primary Sludge Feed System Project,
Job No. 132-91, providing for additional engineering services for an additional amount of
$212,816, and an additional $100,000 for General Manager task order approvals,
increasing the total amount not to exceed $2,990,366.
SUMMARY
• The purpose of this project is to conduct a condition assessment evaluation of the
proposed digester components to be rehabilitated; and prepare a preliminary and
final design for a new primary sludge digester feed loop at Plant No. 2.
• The Engineering Study done to help define this project identified additional electrical
work that needs to be added for reliable operation of the facilities
• The Engineering Study also recommends that an additional Thickened Waste
Activated Sludge (TWAS) Study and design of recommended system modifications
be added to Brown and Caldwell's Professional Service Agreement to ensure that
Job No. P2-91 project recommendations do not impact the operation of the existing
Dissolved Air Flotation Thickeners (DAFTs).
• Staff is requesting that the $100,000 be included in this Amendment for task orders
that would be approved by the General manager. This would allow the General
Manager to expeditiously continue with the design process when small changes
arise. Each task order will have to be approved by the General Manager and will
include a Scope of Work and schedule. Staff is making this request because of
timing issues as explained in "ADDITIONAL INFORMATION."
• Staff recommends that Amendment No. 1 be issued to Brown and Caldwell for
additional electrical work, and a TWAS Study followed by design of system
modifications for an amount not to exceed $312,816. This fee includes the $100,000
provisional fees noted above.
Page 1
PRIOR COMMITTEEIBOARD ACTIONS
Please see attached PSA Status Report.
PROJECT/CONTRACT COST SUMMARY
Approval of Amendment No. 1 is being requested in the amount of$312,816. If
approved, this will be added to the Phase 3 budget. The total revised contract amount
for Brown and Caldwell after Amendment No. 1 is $2,990,366. Budget is available in the
CIP to cover this request as shown in the attached Budget Information Table.
In addition, it is requested that$312,816 be moved from Contingency to Phase 3 to
cover the Consultant work in this Phase.
BUDGETIMPACT
® This Rem has been budgeted. (Line item: CIP Budget Section 8, Page 68)
❑ This Rem has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Background
During preliminary design of Job No. P2-91, it was determined that the existing power
sources were not suitable to provide power to the proposed project equipment. The
DAFT Electrical Room was identified as the best alternative power source. This
Amendment includes additional work to provide adequate power for this and future
facilities.
During preliminary design, the Consultant also recommended that the impact of the new
primary sludge pumping system on the ability of the DAFTs to pump TWAS to the
digesters be evaluated. Any necessary DAFT system modifications to address this
issue would be included in Job No. 132-91.
The proposed Consultant fee to perform the recommended tasks is $212,818. It should
be noted that this fee includes the TWAS evaluation as well as the design of the most
likely solution to the TWAS issue (i.e., increase pump motor horsepower).
Project Schedule
The timeline of Job No. P2-91 is critical to the completion of Job No. P2-66, Headworks
Improvements at Plant No. 2. Commissioning will begin on Job No. P2-66 in the fall of
2008. At that time, R will be necessary to shut down banks of primary clarifiers in order
Page 2
to make tie-ins to the existing facilities. Because of the hydraulic connection between
primary clarifiers and digesters, the digestion process would be severely hampered by
Y the loss of digestion capacity during those periods. In order to avoid regulatory
compliance issues, it is essential that the new primary sludge feed loop system be
completed by that time. Delays in commissioning the new Headworks because the loop
system may not be ready could have significant financial implications on the Sanitation
District.
As with many projects, additional scope may be deemed necessary as the project
progresses through final design especially since the final solution to the TWAS issue is
not known at this time. In order to plan for such scope additions and expedite the
design to reduce schedule delays, it is recommended that the Consultant's Scope of
Work be amended to include a provision for the General Manager to authorize
proceeding with task orders totaling $100,000. This will allow the Consultant to
continue work on the design without delay to the schedule due to administrative
procedures. All such tasks orders will include a defined Scope of Work and schedule.
The provisional fee would increase the proposed Consultant's fee from $212,818 to
$312,818.
ALTERNATIVES
The District could consider not approving the project, in which case, the new primary
sludge feed loop system at Plant No. 2 will not be completed and operations of this
facility will continue as-is.
CEQA FINDINGS
Construction of Job No. P2-91, Plant No. 2 Primary Sludge Feed System Project was
included in the Subsequent Environmental Impact Report (EIR) to the1999 Strategic
Plan Program EIR. The Subsequent EIR was certified on May 26, 2005
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
PK:eh:kf
Rklept4gendaSoard Agenda Reports12006 Board Agenda&Agenda Reports10306Utem 13(g),I-24.doc
Page 3
BUDGET INFORMATION TABLE
PLANT NO. 2 PRIMARY SLUDGE FEED SYSTEM PROJECT,
JOB NO. P2-91
PROPOSED
ORIGINAL CURRENT PROPOSED FUNDS THIS ESTIMATED 1191 TEU
BUDGET PROPOSED TOTAL
PROJECTIPNA$E . AUTNOR12E0 PROJECT INCREASE REVISED AUTHORIZED TO AUTIIORIZA710N. AUTHORIZATION EXPENDITURE EIIPEl7DEGT0
$UOOET BUDGET BUDtlET, DATE REQUEST TO DATE DATE]%I
R EGREASE
Phase 1-Pro' Development S 10D.000 E 635.934 $ 635.934 $ 635,934 S 635.934 S 592,508 93%
Phase 2-Pmliminag Design S 481914 $ 1,481.145 S 1,481,145 $ 1481,145 $ 1,481.145 $ 1094.250 74%
Plisse 3-Desl n $ 2891,487 S 1.011.167 S 312816 S 2.121,283 S 1,808467 $ 312816 $ 2.121,283 0%
Phase 4-ComWctlon S 16634.030 $ 5.767.711 $ 8767711 S 1.713.292 $ - $ 1.713,292 0%
Phase 5.CommissionlM $ 240956 $ 548,BD5 $ 548,905 $ 459,613 $ 459,613 7 0%
Phase 5-Close-Out $ 60.240 $ 77.635 $ 77,83E $ 53,179 It 53,179 $ 0%
Phase 7-Contingency $ 3,2IZ764 $ 1.358.335 f 31281E It 1.045.519 $ aDIVNI
PROJECT TOTAL $ 25.621,391 $ 14,678,132 $ - $ 14.678,132 S 6,151,630 IS 312.8151 $ 6.464,446 S 1,686,758 26%
Reimbursable Costs
PROJECT NET S 25.621,391 IS 14,678,132 $ - $ 14.678.132 S 6,151.630 S 312.818 $ 6.464.446 S IS86,758 28%
PSAtContract
Deshln PEA It 2.677 550 S 2.677 550 1 S 312,6161 S 2,990,366 $ 2,677.550 1$ 312.818 1 $ 2.900,366
Construction Contract IS 15.053.818 $ 15063.818 $ 15.063.818 $ - $ - E
EDMS'. DWOM24
Professional Services Agreement Status Report
Plant No. 2 Primary Sludge Feed System Project,
Job No. P2-91
Total Project Budget: $14,678,132
Consultant: Brown and Caldwell
Date Amendment Description Cost Accumulated
Costs
Original Condition Assessment/Asset Management
9122104 PSA Evaluation of Digester Components and design of
di ester feedloo s stem $2,677 550 $2,677,550
Pending 1 Design of Electrical project elements, TWAS study
and design of TWA S system modifications $312,816 $2.990,366
EDMS'.OD3805023
02/24/06
PDC COMMITTEE tn•y are TO Bd.dgr.
'^ 3/2/06 3(L7/ll6
wft
AGENDA REPORT RunNu� 10�
Orange County Sanitation District
0 Odor Contra[
FROM: David Ludwin, Director of Engineering
Originator: Robert Schirripa, Project Manager
SUBJECT: REHABILITATION OF ODOR CONTROL FACILITIES, JOB NO. J-71-8
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 4 to the Professional Services Agreement with Camp, Dresser,
& McKee for Rehabilitation of Odor Control Facilities, Job No. J-71-8, providing for
additional engineering services, for an additional amount of$327,172, increasing the total
amount not to exceed $4,918,704.
SUMMARY
• In October 2003, the Orange County Sanitation District (Sanitation District) issued a
Professional Services Agreement(PSA) to Camp, Dresser, & McKee (CDM)to
- provide engineering services for the Rehabilitation of Odor Control Facilities,
Job No. J-71-8. This project upgrades the odor control facilities at the Metering and
Diversion, Headworks, and Primary Clarifiers in Plant No. 1.
• Amendment No. 4 adds the following work items to the currently approved PSA:
o Temporary odor control for Ellis Pump Station and Trunkline because these
facilities will be in operation approximately seven to twelve months prior to the
completion of Rehabilitation of Odor Control Facilities, Job No. J-71-8.
o Pump seiection for new pump in Waste Sidestream Pump Station
o Development of base drawings for the Control Center Computer Room
redundant A/C unit
o Incorporate the Sanitation District's new nameplate schedule. The Sanitation
District recently developed a new nameplate schedule which previously did not
exist.
o Additional Odor Modeling work.
o Separating Headworks and Primary Treatment odor facilities into two separate
Bid packages.
PRIOR COMMITTEE/BOARD ACTIONS
The attached PSA Status Report summarizes all Board actions.
Page 1
PROJECT/CONTRACT COST SUMMARY
J
The attached Contract Amendment No. 4 letter from CDM dated January 13, 2006,
summarizes the scope and costs associated with the proposed Amendment No. 4.
Authorization is requested to increase the value of the PSA by$327,172, which will result in
a total PSA not to exceed $4,918,704.
BUDGET IMPACT
® This item has been budgeted. (Line item: Section 8 — Page 84)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The work identified in proposed Amendment No. 4 has been determined by Staff as
necessary for the successful completion and implementation of Rehabilitation of Odor
Control Facilities, Job No. J-71-8. As listed below, the work identified in the proposed
Amendment No. 4 was the result of design requirements and field investigations by the
Consultant during the preparation of the Final Design.
o Temporary odor control for Ellis Pump Station and Trunkline because these facilities will
be in operation approximately seven to twelve months prior to the completion of
Rehabilitation of Odor Control Facilities, Job No. J-71-8.
o Pump selection for new pump in Waste Sidestream Pump Station. The original scope of
work directed the consultant to install an additional pump that matched the existing
pumps recommended by Plant No. 1 & 2 Electrical Power System Studies,
Job No. J-254. However, an exact duplicate of the existing pumps was no longer
manufactured which requires research to identify a pump that would meet the needs of
the Sanitation District while fitting in the allocated space.
o Development of base drawings for the Control Center Computer Room redundant A/C
unit. The original scope of work directed the consultant to install a redundant A/C unit
based on the recommendation from Plant No. 1 & 2 Electrical Power System Studies,
Job No. J-254. However, record drawings did not exist for the current installation and
need to be developed in order to provide the requirements to the future construction
contractor.
o Incorporate the Sanitation District's new nameplate schedule. The Sanitation District
recently developed a new nameplate schedule which previously did not exist. The
consultant is required to identify nameplates but a schedule had not been developed
prior to the award of the PSA. The Sanitation District has now developed this
nameplate schedule and it needs to be followed in order to identify the equipment in the
field. It is more cost effective to perform this work during design than wafting to do it
during construction.
o Additional Odor Modeling works. The original modeling work needs to be modified to
include some specific design details not previously known.
Page 2
o Separating Headworks and Primary Treatment odor facilities into two separate Bid
packages. During the FY05-08 CIP budget cycle, this project was slated to be split into
two projects. However, this was never implemented since the design would not be
completed until after the FY06-07 CIP budget cycle at which time, the decision to split
the project would be revisited. From preliminary discussions with the CIP Validation
team, it appears that the recommendation to split the project into two parts is going to
remain valid in order to assist with the compliance to maintain the cash flow under a
preset limit. The result of this is that the Headworks odor control will proceed to
construction without delay while a three year delay in the start of construction for the
Primary Treatment odor control will be imposed. This work would perform the
necessary functions to develop two separate bid packages.
Previous amendments are summarized in the following paragraphs:
Amendment No. 1, which was approved by the Board in October 2004, added a number of
items to the currently approved PSA including the expansion of Power Building No. 4 (PB4),
a new transformer primary fused interrupter switches in PB4, a new Motor Control Center
(MCC) to serve computer room loads and the redundant HVAC units, a new high resistance
grounding system, and a new dedicated 480V feeder to the MCC located at the Waste Side
Stream Pump Station.
Amendment No. 2, which was approved by the Board in November 2004, added a number
of work items to the currently approved PSA including expansion of Power Building No. 3A
(PB3A), relocation of existing electrical & instrument equipment from PB3A, air modeling of
Plant Nos. 1 and 2 based on odor units, feasibility engineering to determine the proper foul
air treatment to maintain zero odor complaints, and performed Value Engineering services.
Amendment No. 3, which was approved by the Board in June 2005, added a number of
work items to the currently approved PSA including the elimination of the Instrument Loop
Diagrams (ILDs), additional odor modeling, engineering work to better define the
relationship between two odor testing methods, development of a Triple Bottom Line (TBL)
model, performed sensitivity analyses for varying odor emissions, incorporation of the Ellis
Pump Station foul air, redesign of the plant water de-chlorination system, and the relocation
of the PB3A expansion.
ALTERNATIVES
Not issue Amendment No. 4. If Amendment No. 4 is not issued, this additional work will not
be funded and the chances for the success of the project will significantly decrease as Staff
believes that this work needs to be performed in order to provide the required electrical
equipment and associated items for the safe and reliable operation of the odor control
facilities.
CEOA FINDINGS
This project was included in the Sanitation District's Strategic Plan Program EIR. The EIR
was certified on October 27, 1999 and a Notice of Determination was filed on
October 29, 1999. In addition, a Notice of Exemption was filed with the County of Orange
on February 24, 2004.
Page 3
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Letter from CDM dated January 13, 2006
RS:kf:eh
KWgIobaMgenda Draft ReportalPDCV-71-8 PSA Amendmem 4 AR 030206.doo
Page 4
BUDGET INFORMATION TABLE
REHABILITATION OF ODOR CONTROL FACILITIES
JOB NO. J-71-8
' PROPOSED
ORIGINAL r CURRENT' PROPOSED PUND81 THIS ESTIMATE O E$TIM1IATEp .
BUDGET: PROPOSEb T&AL x
PROUECT/PNAeE AVTIIORI2ED PROJECT REVISED AUTHORIAD TO ,AUTHORIZATION EXPENDITURE' :EXPENDEb TO
INCREASE 'AUTHORIZATON ,' DATE(%)
BUDGET `. BUDGET fOECREA§E - BUDGET DATE _' .REQUEST TO DATE
Phase Project
Deaelo ment $ 100.000 S 45.180 $ 46.180 $ 46,180 $ 46,180 $ 46,175 100%
Phase Preliminary
Design S 632,0DD It 1,359.368 S 1,359,368 $ 1,359.358 $ 1359368 S 1.366,337 101%
Phase Des' n $ 3,364.000 $ 4.747.223 $ 321172 I S 5.074,395 ° $ 4.747223 S 327172 $ 5,074.3951 S 3,05D670 60%
Corelmdion S 24.396.000 $ 41,296.902 S 41,296.902 $ 2220,D28 $ - $ 2,220.028 $ 167,598 a%-
Commissionmo $ 421.000 $ 351.986 S 351,986 ';a•.i $ 210,018 $ 210,018 $ (21,516) -10%
Close-Out S 105,000 $ 84145 $ 84145 a'';I $ 55,199 $ 55,189 $ 377 —1%-
ContingenW $ 4,206,000 $ 5,821,586 8 327172 $ 5494414 $ 0%
PROJECTTOTAL $ 33,224,000 $ 53,707,390 $ - $ 53,707.390 $ 8,638,006 $ 8.965.178 $ 4,609.641 51%
Reimbursable Coats
PROJECT NET 1 $ 33,224,000 I S 53707,390 1 $ - $ 53.707,390 --- $ 8.638.006 1 $ 8,965.178 $ 4.609,641 1 51%
PSAIContract
Lesion PSA $ 2193123 1 S 4,591,532 1$ 327.172 $ 4,918704 GI' S 4,591532 $ 327172 $ 4,918.704 $ 3.489,774 1 71%
Consbudion Cantrad $ 21.031.232 1 S 38.810,571 1$ - $ 38810571
EDMS: 00380u79
Professional Services Agreement Status Report
REHABILITATION OF ODOR CONTROL FACILITIES
JOB NO. J-71-8
Total Project Budget: $53,707,390
Consultant: Camp, Dresser, & McKee (CDM)
Date Amendment Description Cost Accumulated
Costs
10/22/03 Original Design engineering services for modifications of odor
control facilities at Metering & Diversion, Headworks, and $3.197,522 $3,197,522
Primary Facilities in Plant No. 1.
9/22/04 Amendment 1 Additional design services required for the expansion of
Power Building No. 4 and associated electrical equipment $377,685 $3.575,207
as well as the implementation of electrical design changes
as a result of proqect J-254.
Additional design services required for the expansion of
11/17/04 Amendment 2 Power Building 3A including the cost for relocating existing $645,674 $4,220,881
equipment to the new expansion. Also, additional design
services for the modeling of Plant Nos. 1 &2 based on odor
units instead of H2S equivalents along with the feasibility
studies to determine the proper treatment processes,
6/22/200 Elimination of Loop Diagrams; additional odor modeling
5 Amendment 3 work; additional design services to incorporate Ellis Pump $370,651 $4,591.532
Station into the Headworks Odor Control System; the re-
design of plant water de-chlorination system; and
Relocation of Power Building 3A expansion
EDMS'.003804468 02123t06
Professional Services Agreement Status Report
REHABILITATION OF ODOR CONTROL FACILITIES
JOB NO. J-71-8
Design for temporary odor control facilities for Ellis Pump
Station &Trunkline; Pump selection for Waste Sidestream $327,172 $4,918,704
Pending Amendment 4 Pump Station; Development of drawings for redundant air
conditioner for Control Center computer room;
Incorporation of new nameplate schedule; additional odor
modeling for P1-102 facilities; and Preparation of separate
bid packages for Headworks and Primary Treatment odor
control
RS:
EOMS:003804468 02/23/06
PDC COMMITTEE Needing Date To Btl. lr.
03/021M n3/22/0a
AGENDA REPORT Item Number Item Number
PDCM24 13(h)
Orange County Sanitation District
®gageattaae
Follett s
FROM: David Ludwin, Director of Engineering
Originator: David May, CIP Project Manager
SUBJECT: REPLACEMENT OF THE BITTER POINT PUMP STATION,
CONTRACT NO. 5-49; REPLACEMENT OF THE ROCKY POINT PUMP
STATION, CONTRACT NO. 5-50; REHABILITATION OF THE 14TN
STREET PUMP STATION, CONTRACT NO. 5-51; REHABILITATION OF
THE "A" STREET PUMP STATION, CONTRACT NO. 5-52
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 6 to Professional Services Agreement with Lee & Ro, Inc.,
providing for additional engineering and construction support services, for Replacement
of the Bitter Point Pump Station, Contract No. 5-49; Replacement of the Rocky Point
Pump Station, Contract No. 5-50; Rehabilitation of the 14" Street Pump Station,
Contract No. 5-51; and Rehabilitation of the "A" Street Pump Station, Contract No. 5-52,
for an additional amount of$328,566, increasing the total amount not to exceed
$4,809,382.
SUMMARY
• Additional construction support services are needed for both the 14" Street Pump
Station and the "A" Street Pump Station construction. Existing contract budget will
expire in April 2006 based on the current expenditure rate of approximately
$10,000 per month per pump station. It is expected that approximately four
additional months are needed for construction completion at each station.
• This amendment also adds funds required for additional engineering services
needed during project commissioning and close out:
o Commissioning Phase Services: In comparison to the original contract scope of
work, the pump stations are larger and consist of more pumps and ancillary
equipment. There is a corresponding greater amount of monitoring and control
equipment and circuitry that needs to be tested and commissioned. Additional
equipment comes with additional O&M Manuals that Lee & Ro, Inc. is
responsible to assemble and ensure are complete for turnover to the Orange
County Sanitation District (Sanitation District). Finally, Lee & Ro, Inc. is
responsible for developing standard operating procedures and an estimation of
maintenance labor hours.
o Closeout Phase Services: Record drawing responsibilities have increased to
match the greater number of drawings.
Page 1
PRIOR COMMITTEEIBOARD ACTIONS
See Attached PSA Status Report. +
PROJECT/CONTRACT COST SUMMARY
This request is for $328,566 for Amendment No. 6 to the PSA. This amendment will
bring the contract total to $4,809,382. The request covers scope of work modifications
to Contract Nos. 5-51 and 5-52 only. See attached Budget Information Tables for more
information.
BUDGETIMPACT
® This Item has been budgeted. (Line item: 2005-06 CAP Budget, Section 6, page 21)
❑ This Rem has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
❑ Not applicable (information Rem)
ADDITIONAL INFORMATION
Construction of the 14" Street Pump Station and the "A" Street Pump Station began in
November 2004. Construction support services have been supplied for the duration of
construction at an average cost per month of$10,000 per pump station. At this
expenditure rate, contract funds will expire in April 2006.
Construction support services consist of submittal reviews, answering requests for
information (RFI), and modifying construction documents. Construction documents are
modified when requested by staff. The modified construction documents are then
presented to the Contractor with a request for proposal. The Contractor uses the
modified documents to base a proposal upon. Staff then evaluates the proposal with
successful proposals resulting in a field change order.
Specific labor intensive efforts necessary for upcoming construction include
architectural changes to both "A" Street Pump Station and 10 Street Pump Station.
This effort is additional to the typical services during construction as it is responding to
changes requested by the City of Newport Beach. In addition to this effort, there have
also been changes to the alignment of relocates City piping that have required
additional labor intensive efforts. The changed alignments were made to help recover
schedule time lost when the contractor's shoring efforts earlier in the project ran
significantly longer than scheduled.
If the requested funding is approved, the resulting consulting construction support
services amount will equal 6.4% of the Job No. 5-51 construction contract value and
6.6% of the Job No. 5-52 construction contract value. These values are equal to that
budgeted for all collections system projects at the Sanitation District.
In addition to basic construction support services, additional work scope has been
identified in commissioning (Project Phase 5) services and closeout (Project Phase 6)
services. The facilities being constructed are more complex than the facilities originally
bid by Lee & Ro, Inc. in 2000. There are a greater number of pumps and corresponding
monitoring and control circuitry that must be commissioned. There is also a greater
Page 2
\ level of effort needed for O&M Manual preparation and standard operating procedures
development.
Additional closeout services effort includes time for additional record drawings and
attendance at a Sanitation District required "post mortem" project meeting to discuss
ways to improve future project designs, bid documents, and project management.
ALTERNATIVES
No viable alternatives.
CEQA FINDINGS
The CEQA actions vary by contract number. The current CEQA status of each project
is listed below by contract number.
• 5-49 —A Mitigated Negative Declaration was filed in March 2003.
• 5-50 —An EIR was certified August 25, 2004.
• 5-51 —A Mitigated Negative Declaration was fled in December 2002.
5-52 —A Mitigated Negative Declaration was filed in March 2003.
ATTACHMENTS
1. Budget Information Tables
2. PSA Status Report
3. Lee & Ro Proposal Letter
DM,ba,kf,eh
H:\ntglobaRAgenda Draft Reports\PDC15-51 AR PSA Amendment B.dm
Page 3
BUDGET INFORMATION TABLE
Replacement of Bitter Point Pump Station
CONTRACT NO. 5-49
ORIGINAL CURRENT PROPOS DPROPOSED FUNDS THIS ESOMATED ESTINATEp
PR0.IEC11PHASE AUR1Ofl/ZED PROJECT BUDGET REVISED AUTHORIZED AU7HORIZATIOH PROPOSED TOTAL
MCREnSE EXPENDITURE 'EXPENMED TO BUDGET BUDGET BUDGET TO DATE REOUEGT. AUTHORIZATIONTOOATE pACiS(I
/DECREASE
PS I PmIW DeVeigneM S 37.527 S 38,000 S _e0), s 38.000 S 30000 f 39.971 105%
Pt 2-PMllmeu Oea n S 506.053 f 5930m S 593,000 S 593000 S 593.Om S 592.691 IBM
Pnafe 3-Dsign S 1,511.101 S 229292B S 2.292.920 $ 2292920 $ 2.N2,925 S I.M. 47 SI%
PMue4-Dm6 f 5.085152 S 23.M593 S 23.445.943 S 762,911 $ 762.911 S 0.310 1%
PNse 5-CbMlMulaSN S 143731 S 19B.94S S 199945 5 171599 5 171.%9 S 1.230 I%
Phase 6-Cb9eO�e S 35.033 S t00.5m 3 100,500 3 76502 5 75.502 S T74 1%
Plow 7-C.M1qn, S 839.088 S 2349.604 S - 5 2349684 S
$ 8.150.555 S , $ 3,9M,90 f 1,852,934 45%PROJECT TOTA . . . . ,9
ReimWnatW Costs
PROJECTNET S 8,1W.U5 1 S 29,019,000 $ - S 29019.000 11 S 3.936.940 S - S 3936.WO S 1,892,924 1 45%
PSAIConb9et
Des nPSA f 324.537 S 2187675 1$ - S 2.187.076 $ 2106027 S - S 2.1m99r S 10H,247 50%
Dm5W0mn Cm09q is 4.373.076 S 22.4H.984 S -IS 22444.994
EOu9.m3N5072
BUDGET INFORMATION TABLE
Replacement of Rocky Point Pump Station
CONTRACT NO. 5-50
ORIC.INAI CURRLNT PROPOSED PROPOSCO FUNDS - TMS EBIWATED C611WTED
PROJLCTIP{IASE - AUniRET BUDGET PROPOSED TOTAL
PROJECT R3ED AUTRORIZED TO AUMORVA71ON EXPEND{TDRE EXPENDED TO
OVOGET DUDGET INCREASE _ EVI
AECREASE UUDOET DATE REQUEST 3WTNORVAUON TO DAM OATEPA)
1 IC
Plpan l-% ,ppY¢q ,, 3 10124 1 10.232 10 2'2 1 10.232 1 10212 S 19 Sl1 123%
Phue2-PMin .q Deli 0 f 421015 f 599.190 S 599.100 1 509.150 $ MAW S 807,331 101%
Ph 3-Des n S 3.280.206 1 S 3.314,143 S 3.314.143 S 3.314.143 $ 3.314.143 S 2629.350 79%
Pb 4-C ,nWon f 4.702595 S 17.IW.S06 $ 17,IW 506 $ 590000 S 59000D S 172 O%
Phew 5-ComrR,ssioSn, S 140.119 f 179000 S 179,000 $ 05.000 $ es000 f 88632 101%
P1193e 5-Cb Ow S 35010 3 30.500 1 30.500 S 17,000 9 17000 5 0%
PMW7-Cahn S 792.1H S 31280,081 S 3290,081 1
PROJECT TOTAL S 9,301.030 S 24.M522 S - 6 24.609,022 1 4615,535 $ - 3 4,015.535 $ 3.337,702 72%
Reimbumble CosO
PROJECTNET $ 9.361833 S 24 609 622 S - S 24.609622 $ 4,615.535 S - $ 4.615.535 S 3.33],]02 72%
PSA/CORtr00t
DellnPSA 3 344679 3 49 ,023 I 1 - S 494 023 S 4W.127 1 S - 1 410.127 S 251.923 61%
COnstruCign Con9atl $ 4,011,882 3 16A50403 $ - S 16,450403 S
EWS 00)86507?
BUDGET INFORMATION TABLE
Rehabilitation of 14th Street Pump Station
CONTRACT NO. 5-51
ORIGMAL CURRENT. PROPOSED PROPOSED PONDS.: THIS PROPOSED. �ESTIMATED� ESTIMATED
PROJECTIPHASE - AUTHORIZED - PROJECT BUDGET. REVISED AUTRORDED TO AUTHORIZATION ' TOTAL 'EXPENDITURE EXPENDED TO
BUDGET . BUDGET INCREASE ADECREASE' BUDGET DAM REQUEST AUTHORIZAl1014 TO DATE .DATE(%) ' -
PhaSe I Project Development S 8.965 5 9000 S 9,000 S 11000 5 9.ODO 5 0,965 100.E
Phase 2-Nahminew,Design $ 41,000 $ 41,000 S 41.000 s 41,000 3 41000 $ 41312 101%
Phase].Design $ 1.113458 1 S 1367000 1 $ 1.387000 S 1]8]A00 $ 1,367.000 S 1.370.163 100%
Phase 4-CmS8u06on 3 2.907142 $ 6781,000 S 186999 $ 61949.969 $ 6,781.000 $ 180909 S 6949909 S 3.372,688 42%
Phase 5-Conan,ni0nin S 123707 S 100000 $ 100.000 3 100.00 $ 100.000 S 350 M
P"Ba,a-URWOM S 30967 S 3s000 $ 34000 $ 34,000 S 34000 1 O%
Phase]-Cmbn en S 391554 S 555.000 S 158989 S 307011 $ 555,000 S 100909 S 387011 O%
PROJECT TOTAL $ 4616,753 6 8,808,000 S - S 8,868,D00 -'. $ 8,888000 S $ 8,98B,D00 S 4,793.358 51%
Reimbursable Casts
PROJECT NET 5 4.616.753 1 $ e,1988.000 $ - $ 87886,000 =. S 0,088.000 $ - $ 8.868.000 1 S 4793,35E 1 54%
PBAICan4a9l
Des nPSA $ 242195 1 S 760681 1 S 100989 S 918.853 1. S 700.864 S 186.968 1 S 949.853 1 $ ]54.404 79%
,,BAC9en CW9alI S 23]0]2B 1$ 6038480 1 S S 8036490 -. S 8038490 S 5 6MAAAO I S 141857n d0%
EOM$ 003165072
BUDGET INFORMATION TABLE
Rehabilitation of"A" Street Pump Station
CONTRACT NO. 5-52
UIUGIRA- CURRENT PROPOSER . PROPOSED ;FUNDS THIS PROPOSED - ESTIMAILO ESTIMAIED
PROJECTIPIIASE AUTHORIZED PROJECT BUDGET -_ REYI6E0 AUTHORIZED TO AUTNOftIZATION TOTAL FJ{PENOITURE EXPENDED TO
BUDGET BUDGET 'INCREASE BUDGET DATE REQUEST AUTHORI TIOH TO DATE '- DATEI%)
03EOREASE
Phafie I -Pm ed Derelo^.menl S 16.182 5 16.000 S 16,010 S 16 coo $ 16.000 S 16.162 toll;
Phase 2.Poolron DesOjin 3 71,000 3 131000 s 104.000 S luel)o f 134.000 S 1]4l25 100%
Ift.3-De ' n s 1615 022 S 1.920 000 $ 1 920 000 S 1.920 000 S 1 920000 3 1.927.901 100%
PMse4-Constnj tl f 2.1131.0931 S 8392000 S 159617 S 6.551,572 S 6.392,000 $ 1595T] S 8551,5T2 3 4017087 61%
Phase S-Cammasion $ 125.035 3 11a.000 S 113000 S 113000 S 113.000 S 14.425 13%
Phase 6-UbIRE0.1 S 312H S 34.000 S 34,000 s 34.000 S 34.000 0%
Phase T-Cmtl e 9 323.095 3 474.000 S 1595T] 3 314423 s 474000 $ 159 f 314,423 0%
PROJECT TOTAL f 5.012A95 S 9003000 3 - 3 9003000 $ 9.063.000 3 - S 9.683000 s 8.110.219 67%
RNm1AP,.ble Costs
PROJECT NET S 5.012.685 1 S 9.083,000 S - S 9,003.000 $ 9.083.000 $ - S 9.083,000 S 6.110.218 67%
PSMcentract
DeSi nPSA S 237.790 1 S 1.IHE253 1 S 159b1r] S 11]].830 S 1016.253 S 159577 1 S 1,1]].830 S 842.211 1 80%
ComhuGi0n Canbad f 2,331.350 3 5859290 3 - f 5659290 1, 1 5 5558290 1 5659280 3294730 58%
EDMS'.003505012
Professional Services Agreement Status Report
Contract Nos.: 5-49, 5-50, 5-51, 5-52
Total Project Budget: $71,600,000
Consultant: Lee & Ro, Inc.
Start Date of Project: March 22, 2000
Date Amendment Description Cost Accumulated
Costs
3/22/2000 Original PSA Engineering & Construction Support Services $1,149,801 $1,149,801
3/27/2002 1 Additional Engineering Services $495,247 $1,645,048
9/242003 2 Additional Engineering Services $447 047 $2,092,095
9222004 3 Additional Engineering Services $818,093 $2,910,188
5252005 4 Additional Engineering & Construction Support $553.312 $3,463,500
Services
2222006 5 Additional Engineering & Construction Support $1,017,316 $4,480,816
Services for Bitter Point PumpStation nly
Pending 6 Additional Engineering & Construction Support $328,566 $4,809,382
Services contracts 5-51 and 5-52 only
Note: Project Budget shown is for Contracts 549, 5-50, 5-51 and 5-52.
EDMS.003805073
Revised 01109/06
- P.C.RM93070
LT Clya MaUsro ( 9/7,5.9070
Tel.•(A 9)7153070
Fax.•")912-2015
www.leaso.cam
LEE RQ Inc.
1199Soath FuWat Road,MY of Industry,CA 91740
February 7,2006
Mr. David May, P.E., Project Manager
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley,CA 92708-7018 34300
Subject: Request for AdditionalCompensation -
Contract 549 Replacement of Bitter Point Pump Station
Contract 5-50 Replacement of Rocky Point Pump Station
Contract 5.51 Rehabilitation of 14�Street Pump Stallion
Contract 5-52 Rehabilitation of A-Street Pump Station
Dear Mr. May:
As we agreed during several focused meetings,the scope of work of the subject contracts have
changed to address the additional requirements not identified In the original scope of work.
Attached are summery tables for each contract showing the detailed cost calculation and -
description of the scope changes.
The following is the summary of our request for additional compensation:
• Contract 5-49 Replacement of Bitter Point Pump Station $0
• Contract 5-50 Replacement of Rocky Point Pump Station $0
• Contract 5.51 Rehabilitation of 14th Street Pump Station $168,989
• Contract 5-52 Rehabilitation of"A" Street Pump Station $159,577
TOTAL ADDITIONAL COMPENSATION REQUESTED $328,566
If you have any questions or need additional Information, please call Sal Calderon or me at
626/912-3391.
Very truly yours,
LEE &RO, Inc.
M. sta a Ro, P.E.
President
MSR:SJC:mc
Enclosures (2)
cc Sal Calderon, LEE & RO, Inc.
Celebrating r) Saccesafid Yearsl
ymoiwv�,u"au•umwaxxoua xo.aw,gemsmn.Inne,a"a�e,maaoc 1979 - 2004
PDC COMMITTEE Fi4ecting Date To W-of Dr.
03/02/06 03/22/06
AGENDA REPORT It Number Item Number
_ PDC06-25 13(i)
Orange County Sanitation District
QsColleclten IQ
Facilities
FROM: David Ludwin, Director of Engineering
Originator: David May, Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION, JOB NO. 1-2-4
GENERAL MANAGER'S RECOMMENDATION
Approve a Cooperative Agreement with the City of Huntington Beach for remaining work
to be completed on the Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4.
SUMMARY
• The previous encroachment permit issued by the City of Huntington Beach (City)
expired in spring 2005. Prior to issuing a new permit, the City is requesting that the
City and the Orange County Sanitation District (Sanitation District) enter into a
cooperative agreement.
• The cooperative agreement has been developed through coordination between
Sanitation District staff and City staff. Steve P. Rados also participated in the
development of the agreement conditions. The City Attorney's office has provided
legal input into the agreement. Sanitation District General Counsel has also
provided legal input into the agreement.
• Once the agreement is in place, the City will issue new encroachment permits. The
permits will cover restarted work for the Bushard Trunk Sewer Rehabilitation, Job
No. 1-2-4.
PRIOR COMMITTEE/BOARD ACTIONS
See attached PSA Status Reports for Boyle Engineering and Earth Tech Inc. for
engineering and construction services contract status. Job No. 1-2-4 with Steve P.
Rados was awarded June 26, 2002 and totals $35,710,113 through Change Order
No. 17. Job No. 1-2-4P with Ameron International was awarded September 28, 2005
and totals $7,699,777 with no change orders to date.
PROJECT/CONTRACT COST SUMMARY
See attached Budget Information Table.
Page 1
BUDGETIMPACT ,
® This item has been budgeted. tune Rem: 2005-06 Budget Book, page 8-47)
❑ This item has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
In June 2002, Steve P. Rados began construction of the Sanitation District project,
Bushard Trunk Sewer Rehabiliation, Job No. I-2-4. Through 2004, this work continued
at an abbreviated pace due to pipe cracking problems. The problems were mediated
and a settlement agreement was executed in August 2005. Approximately one third of
the new piping has been installed to date.
An encroachment permit was issued to Steve P. Rados by the City for all work, but that
permit expired in 2005 while the settlement agreement was being mediated. City staff
has indicated that the City will not issue a new encroachment permit until a cooperative
agreement is approved by City Council and the Sanitation District Board of Directors.
Due to several timing constraints, one of which is a work finish milestone stated in the
settlement agreement, it is highly desirable to restart Steve P. Rados work as soon as
possible. But, to begin work, Steve P. Rados will need a new permit from the City. That
permit will not be issued until the cooperative agreement has been developed and
approved by both agencies.
The agreement covers issues which were difficult for City staff to enforce during
previous work performed by Steve P. Rados. The cooperative agreement allows the
City to address these issues directly with the Sanitation District as well as Steve P.
Rados to ensure quicker responses and better enforcement. The agreement was
cooperatively developed between the City, the Sanitation District staff, the City
Attorney's office, and General Counsel.
ALTERNATIVES
Do not approve the agreement. It is unclear how the City would proceed without the
agreement. Such a procedure would need time to be enacted. The length of this time
would be directly related to the City's enactment efforts. Work by Steve P. Rados would
be prohibited until such a procedure was enacted, thereby delaying the Bushard Trunk
Sewer Rehabilitation, Job No. 1-2-4. The length of delay is unknown.
CEQA FINDINGS
The Program Environmental Impact Report was certified in 1999 by the Board of
Directors. Addendum 8 to the Program EIR was certified at the February 2006 Board
meeting.
Page 2
ATTACHMENTS
1. Budget Information Table
2. PSA Status Reports
DM:ba:eh
H:Mtglo lfterMe Draft Repons'PDCWR_CHB COOPERATIVE AGREEMENT Mar 06.doe
c'Y
Page 3
ATTACHMENTS
0
1. Budget Information Table
2. PSA Status Reports
DM:ba:eh
H:MtglobaMgenda Draft ReportMPDCAR_CHB COOPERATIVE AGREEMENT Mar OB.dw
Page 3
O �
BUDGET INFORMATION TABLE
Bushard Trunk Sewer Rehabilitation
JOB NO. 1-2-4
ORIGINAL CURRENT PROPOSEDPROPOSED FUNDS THIS ESTIMATED ESTIMATED
BUDGET PROPOSED TOTAL
PROJECTIPHASE AUTUDGET PROJECT BUDGET AUTHDATE TO AUTHORIZATION EXPENDITURE E%DATE(%TO
INCREASE AUTHORIZATION
BUDGET BUDGET 10ECREASE BUDGET DATE REQUEST TO GATE OATEt%)
Phase l-Project Development 5 74,000 $ 74.000 $ 70000 $ 74.000 E 74000 5 74,575 101%
Phase 2-Prellmina Design $ 10.000 $ 10.000 $ 10,000 $ 10,000 $ 10.000 $ 9.161 92%
Phase 3-Deal n 2168000 210800D $ 2168.000 S 2168000 8 2,168000 $ 217/531 100%
Phase 4-Conduction $ 48.142.000 58 142 000 S 58.142.000 $ 49.390 962 $ 49.3B4,962 $ 25.527 306 52%
Phase 5-CommlasloM S 418000 S 418000 S 416.000 $ 326,000 S 326.000 $ 251509 77%
Phase 6-Cbse-0W $ 72000 $ 720110 $ 72.000 $ 40000 $ 40000 5 1657 4%
Phase 7-Gonthgem S 2698000 S 2698000 5 2.698000 $ 2.698.000 2698000 0%
PROJECT TOTAL S 63,680000 S 0316809000 $ - S 63,580,000 5 54.710,962 S - $ 54.710,962 S 28,038.739 51%
Reim6unaele Cosh
PROJECT NET 1 $ 93.880,000 $ 63,580,000 1 S - $ 63,580.000 $ 54,710,962 1 $ - $ 54710962 $ 28.038.739 1 51-4
PSA/Contract
Dealer,PSA S 845.300 $ 2467825 $ 2467.825 $ 2467,825 S 2067825 5 2166,745 88%
CM PEA S 2.000,000 $ $ 2.052.593 $ 2,052593 $ 2052593 S 0%
Consultant l-2-/A S - S 89/08 $ 85105 I, S 85108 $ 89108
Pipe Phocumment-144P $ - $ 7698777 S 7,699777 $ 7698777 S 7699777 $ 0%
Centimeter,Contact-Rados $ 30,260,934 S 32,264139 32 64139 S 32.264,139 S 32.264139 $ 18.247.308 50%
Conslmellon Contact-1-24A S - $ 10000000 $ 10000.D00 �', $ 10000000 S 10000000 $ 0%
SOWhem CelBo'nie Edison S 350,000 S 350000 $ 350000 350000 S 0%
EDMS:003805868
Professional Services Agreement Status Report
Bushard Trunk Sewer Rehabilitation
Job No. 1-2-4
Total Project Budget: $63,580,000
Consultant: Boyle Engineering Corporation
Date Amendment Description Cost Accumulated
Costs
Engineering design and construction support
4/26/00 Original PSA services for replacement and/or rehabilitation of $845,300 $845,300
Bushard Trunk Sewer
1/11101 Amendment 1 Increasing the utility search activities to include $24,800 $870,100
37 additional potholes
3/21/01 Amendment 2 Provide for additional study of City of Huntington $12,808 $882,908
Beach sewer interfacing.
Provide for groundwater hydraulic testing and
6/27/01 Amendment 3 include fiber optic cable conduit in the $85.000 $967,908
construction documents.
Additional engineering services including
geotechnical boring work, City sewer relocation,
2/28/02 Amendment 4 study of flow handling for construction, Plant No. $231,200 $1,199,108
2 entrance modifications, City storm drain
relocation at Adams Blvd., pavement survey, and
the connection to Plant No. 2.
Additional engineering services for construction
10/23/02 Amendment 5 support including submittal review, consultation, $555,403 $1,754,511
meetings, pipe inspection, materials inspection,
and geotechnical reviews.
02Q G
Date Amendment Description Cost Accumulated
Costs
Additional engineering services related to pipe
12/17/03 Amendment 6 problems, traffic control plans, pipe lining study, $264,900 $2,019,411
large number of submittal reviews, and additional
meetings.
Additional engineering services related to project
11/17/03 Amendment 7 time extension, continued pipe problems, and $326,509 $2,345,920
service to meet public concerns.
Additional engineering services resulting from
9/28/05 Amendment 8 settlement agreement and for bypass pumping $121,905 $2,467,825
design at Ellis Ave. intersection.
EDMS: 003803901
02/23/06
Revised 05/14/98
Professional Services Agreement Status Report
BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4
Total Project Budget: $63,580,000
Consultant: Earth Tech Inc.
Date Amendment Description Cost Accumulated
Coats
Construction Management Services for
11/23/05 Original PSA replacement of Bushard Trunk Sewer and $2,052,593 $2,052,593
Associated Facilities
EOMS:003803903
02123/06
1 PDC COMMITTEE Meetlng Oats ro Bd.or ar.
�i 03/02/06 03/22/O6
AGENDA REPORT Item NunUer Item Number
PDC06-26 13(il
Orange County Sanitation District
®Collections
Facilities
FROM: David Ludwin, Director of Engineering
Originator: David May, Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION, JOB NO. 1-2-4
GENERAL MANAGER'S RECOMMENDATION
Approve a Reimbursement Agreement with Orange County Water District for Bushard
Trunk Sewer Rehabilitation, Job No. 1-2-4.
SUMMARY
• As part of Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, work, the Orange
County Sanitation District (Sanitation District)will be required to relocate a segment
of the Orange County Water District's (OCWD) 24-inch recycled water pipeline.
• Through cooperative planning between OCWD, the City of Fountain Valley, and the
Sanitation District, the relocated pipeline will be upsized to a 30-inch diameter pipe
to meet the future needs of OCWD. In addition, approximately 300 linear feet of
pipe will also be upsized and constructed for OCWD. The pipe upsizing and
additional length are independent of the relocation work and will be paid for by
OCWD. This additional work will be constructed by OCSD's contractor.
• The Sanitation District and OCWD have prepared an agreement to cover cost
reimbursement for the pipe upsizing and additional length. The Sanitation District
will pay the contractor and then be reimbursed by OCWD. The agreement covers
the terms and conditions of the reimbursement.
PRIOR COMMITTEE/BOARD ACTIONS
See attached PSA Status Reports for Boyle Engineering and Earth Tech, Inc. for
engineering and construction services contract status. Job No. 1-2-4 with Steve P.
Rados was awarded June 26, 2002 and totals $35,710,113 through Change Order
No. 17. Contract I-2-4P with Ameron International, Inc. was awarded
September 28, 2005 and totals $7,699,777 with no change orders to date.
PROJECT/CONTRACT COST SUMMARY
See attached Budget Information Table.
Page 1
BUDGETIMPACT H
® This item has been budgeted. (Line item: 2005-06 Budget Book, page 8-47)
❑ This item has been budgeted, but there are insufficient funds.
❑ This Rem has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
As part of work in the intersection of Ellis Avenue and Bushard Street, the Sanitation
District must relocate an OCWD 24-inch recycled water pipeline. The installation of the
new Sanitation District 108-inch diameter Bushard trunk sewer requires the relocation of
the OCWD pipeline. This pipeline is part of the OCWD sea water intrusion barrier
system. The Sanitation District is paying for the costs of the relocation of the 24-inch
pipeline.
In an effort to provide better cooperation and planning between public agencies, OCWD
proposed that in addition to the relocation, that the pipe be upsized to 30-inches in
diameter, and that an additional 300 liner feet of piping be relocated. The Sanitation
District is not obligated to pay for the pipeline upsizing or the additional pipeline
relocation requested. But, as part of the better planning effort, it was acknowledged that
it is desirable to perform this work while other work was being performed in the
intersection. OCWD has prepared plans and specifications for this work, which have
been provided to staff.
The Sanitation District and OCWD have drafted an agreement to cover the conditions of
reimbursement. The agreement is structured such that the Sanitation District contractor
performs the work and is paid by the Sanitation District. The Sanitation District would
then request reimbursement from OCWD for the cost of all work. The amount
reimbursed would be equivalent to the cost of the pipe upsizing and additional 300 feet
of relocation minus the original relocation of 24-inch piping incidental to Sanitation
District work.
The agreement was prepared by staffs of both agencies, including review by respective
legal counsels for both agencies.
ALTERNATIVES
Do not approve the agreement. This would transfer the responsibility for coordinating
and managing the work to OCWD. This option would preclude the work being done
simultaneously with Sanitation District work in the intersection. This alternative would
therefore likely result in more impacts to the adjacent residents and vehicular traffic due
to extended overall work durations to perform all Sanitation District and OCWD work.
Page 2
CEQA FINDINGS
The Program Environmental Impact Report (EIR) was certified in 1999 by the Board of
Directors. Addendum No. 8 to the Program EIR was certified at the February 2006
Board meeting. However, OCWD covers this work under its own CEQA action for
which the Sanitation District has no responsibility.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Reports
DM:ba:eh
H:WglobaMgenda Draft RepoHs\PDC\AR�_OCwD REIMBURSEMENT AGREEMENT Mar 05. o
Page 3
BUDGET INFORMATION TABLE
Bushard Trunk Sewer Rehabilitation
JOB NO. 1.2.4
ORIGINAL CURRENT PROPOSED PROPOSEDFUNDS THIS ESTIMATED EXPENDED
ESTIMATED
BUDGET - PROPOSEZATION
PROJELTIPHASE AUTHORIZED PROJECT IRON : REVISED AUTHORQEO TO AUTHORIZATION EXPENDITURE EXPENDED TO
'BUDGET BUDGET EASE BUDGET DATE ' REQUEST AUTHORI]JlTION TO DATE OATE1%)
/DECREASE
Phase l-Pmecl Develomenl $ 74000 $ 74.000 $ 74,000 $ 74.000 $ 74,000 $ 74.575 191%
Phase 2-Preliminary DmIgn S 10,000 3 10.000 S 10,000 $ 10.000 $ 10.000 $ 8161 92%
Phase 3-Design S 2168000 2168.000 S 2.168000 $ 2168000 $ 2.168000 $ 2174531 100%
Phase 4-Cohalmollon $ 48142000 $ 58142000 $ 58,142,000 $ 48394962 $ 49394S62 $ 25527305 52%
Phase 5-Commkabnin $ 418000 3 416.000 $ 416.000 $ 326,000 S 326.000 $ 251509 77%
Phase 6-Close-Out $ 72000 $ 72.000 $ 72000 $ 40.000 $ 40,000 $ 1,857 4%
Phase 7-Cwtinmem S 2,888000 $ 2A98000 $ 2,698.000 $ 2698000 $ 2,698,000 0%
PROJECT TOTAL $ 53,580,000 S 63,580.000 S - S 63580.000 S 54,710.982 S - $ 54.710.962 S 26.036,739 51%
Relmbursaale Cosh
PROJECT NET S 53.560A00 1 $ 63,580,000 $ - $ 63.580,000 1 S 64,710962 1 $ - $ 54.710.962 1 $ 28,038739 51%
PSAJContnct
DestgnPEA $ 845.300 S 2.467,825 S 2467825 $ 2,467825 $ 2A67,825 S 2,166,745 88%
CM PEA $ 2,000.000 S S 2052.593 $ 2,052.593 2,052,593 S 0%
Consullanl I-24A $ - $ 85108 $ 85108 85108 85108
Pip.P..mmeM-P24P $ - $ 7.699777 $ 7699777 $ 7.699777 S 7608777 $ 0%
Constmctlan Con"d-Rafts $ 30260934 S 32.264,139 $ 32264,139 $ 32254,139 $ 32264139 S 18,247,398 50%
Conalnxlien C.M.0-I-24A q - g 10.000,000 $ 10000000 I;. $ 10.000000 $ 10000000 $ 0%
Seulhem Ce9lomla Edison $ - $ 350.090 S 350.000 ?. $ 350.000 S 350.000 $ 0%
EDMS:UD3805888
Professional Services Agreement Status Report
Bushard Trunk Sewer Rehabilitation
Job No. 1-2.4
Total Project Budget: $63,580,000
Consultant: Boyle Engineering Corporation
Date Amendment Description Cost Accumulated
Costs
Engineering design and construction support
4/26/00 Original PSA services for replacement and/or rehabilitation of $845,300 $845,300
Bushard Trunk Sewer
1/11/01 Amendment 1 Increasing the utility search activities to include $24,800 $870,100
37 additional potholes
3/21/01 Amendment 2 Provide for additional study of City of Huntington $12 808 $882,908
Beach sewer interfacing.
Provide for groundwater hydraulic testing and
6127/01 Amendment 3 include fiber optic cable conduit in the $85,000 $967,908
construction documents.
Additional engineering services including
geotechnical boring work, City sewer relocation,
study of flow handling for construction, Plant No.
2/28/02 Amendment 4 2 entrance modifications, City storm drain $231,200 $1,199,108
relocation at Adams Blvd., pavement survey, and
the connection to Plant No. 2.
Additional engineering services for construction
10/23/02 Amendment 5 support including submittal review, consultation, $555,403 $1,754,511
meetings, pipe inspection, materials inspection,
and geotechnical reviews.
02/23/06
Revised 0511V98
Date Amendment Description Coat Accumulated
Costs
Additional engineering services related to pipe
12/17/03 Amendment 6 problems, traffic control plans, pipe lining study, $264,900 $2,019,411
large number of submittal reviews, and additional
meetin s.
Additional engineering services related to project
11/17/03 Amendment 7 time extension, continued pipe problems, and $326,509 $2,345,920
service to meet public concerns.
Additional engineering services resulting from
9/28/05 Amendment 8 settlement agreement and for bypass pumping $121,905 $2,467,825
design at Ellis Ave. intersection.
EDMS: 003803901
02/23/06
Revised 05114/98
Professional Services Agreement Status Report
BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4
Total Project Budget: $63,580,000
Consultant: Earth Tech Inc.
Date Amendment Description Cost Accumulated
Costs
Construction Management Services for
11/23/05 Original PSA replacement of Bushard Trunk Sewer and $2,052,593 $2,052,593
Associated Facilities
EDMS:003803903
02/23106
PDC COMMITTEE Meeting Date To ofDir.
03/02/06 03/22/06
AGENDA REPORT item Number item Numirer
r PDC06-27 13(k)
Orange County Sanitation District
MUtility Systems
FROM: David Ludwin, Director of Engineering
Originator: Mike Puccio, CIP Project Manager
SUBJECT: 66KV SUBSTATION AT PLANT NO. 1, JOB NO. P1-97
GENERAL MANAGER'S RECOMMENDATION
(1) Approve a Sole Source Agreement with Southern California Edison for engineering
services, fees, materials, and labor for 66kV Substation at Plant No. 1, Job No. P1-97,
for an amount not to exceed $6,052,000: and (2) Increase the project budget in the
amount of$4,302,947 for a total amount of$9,475,538.
SUMMARY
• The purpose of this project is to provide sufficient electrical service capacity to
supply power to the loads for new facilities that will be added to Plant No. 1 through
2012.
• The Agreement will include the following:
1. Engineering services, fees, materials, and labor for the design and construction
of the Southern California Edison (SCE) owned and operated 66kV Substation.
2. Engineering services, fees, materials, and labor for the design and construction
of improvements to SCE distribution and transmission systems required as a
result of 66kV Substation.
• SCE is the sole electrical utility service provider in the area of Plant No. 1.
Therefore, no other electrical utility was capable of providing the 66kV transmission
system required.
PRIOR COMMITTEE/BOARD ACTIONS
None.
PROJECT/CONTRACT COST SUMMARY
Please see the attached Budget Information Table. A total of$6,052,000 for SCE is
requested for authorization. A total project budget increase in the amount of$4,302,947
is required, for a total amount of$9,475,538. The extent of the required SCE work for
the substation was not known at the time of the original budget.
a-1.aa oda1e1 Page 1
BUDGETIMPACT
❑ This item has been budgeted.
® This item has been budgeted, but there are insufficient funds.
(Line item: 2005/2006 CIP Budget, Section 8, page 90)
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The following projects will add load to the existing Plant No. 1 electrical distribution
system:
1. New Secondary Treatment System at Plant No. 1, Job No. P1-102.
2. Sludge Dewatering and Odor Control at Plant No. 1, Job No. P1-101.
3. Sludge Digester Rehabilitation at Plant No. 1, Job No. P1-100.
4. Activated Sludge Plant Rehabilitation at Plant No. 1, Job No. P1-82.
5. Rehabilitation of Odor Control Facilities, Job No. J-71-8.
6. Replacement of Ellis Pump Station, Job No. 1-10.
The existing Plant No. 1 electrical service from Southern California Edison (SCE) is
supplied at a voltage of 12,000 volts (12kV). With the increase in electrical loads due to
several CUP projects, the existing 12kV service capacity will be insufficient to supply
power to Plant No. 1 by the end of 2008. SCE will only supply loads up to about 10,000
kilo-Volt-Ampere (WA) at 12kV. The load of the plant will be increased to a peak of
25,000 kVA in the near future and SCE requires loads of this size to be served at 66kV.
The new service will be supplied at a voltage of 66,000 volts (66kV) via a double ended
substation which will be owned and operated by SCE. The new 66kV substation will
consist of two redundant 66kV to 12kV transformers with two independent 66kV primary
feeders. The 66kV substation will be primarily fed from the SCE Ellis substation located
across Garfield and adjacent to the nursery. If the SCE Ellis substation fails, the new
66kV substation will be capable of being fed from at least one other SCE substation.
As an added benefit, the 66kV service will decrease the Sanitation District costs per
kilowatt-hour for demand charges by 50% and the discount for facilities and time related
demand charges will be increased from $0.16/kw to $5.28/kw.
ALTERNATIVES
There are no alternatives to constructing a 66kV substation due to the significant
increase in electrical loads through 2012. SCE is the only electrical utility that can
supply the required 66kV service.
A«..b. �03 Page 2
u
CEQA FINDINGS
The proposed 66KV substation at Plant 1 was analyzed in the Subsequent
Environmental Impact Report (SEIR) for the Secondary and Plant Improvement Project.
The SEIR was certified in May 2005. Additional CEQA documentation of transmission
lines and improvements to be constructed under P1-97 is required.
ATTACHMENT
Budget Information Table
MP:ba:kf:eh:kf
H:\m0l Whalen.Draft RemisTMP1-97 SCE 030206.doc
R-. .1.1. Page 3
BUDGET INFORMATION TABLE
66KV SUBSTATION AT PLANT NO.1
JOB NO.Pt-97
�** ORIGINAL CURRENT PROPOSED
BUDGET PRDP09K.. FUNDSdAMORMnON
PROPOSED" --E9TMATEO '.ES
PROJKTIPHASE AUTHORIZED. PROJECT RMSE0 - AUTHORIZEDTO TOTAL 'bWENOOURE EIPEENCREABEBUDGET BUODET BUDGET OpTE AMOI II(IN '. TODATE W/OELREASEP 1- .iIt S - 3 05A00 3 B5.000 S 860003 85.000 S 64.019 76%
Pep 2-P 0 S 26.000 S E5.3]S S 2 .m S 25.3733 2SX3 3 98s <%
P 3- S fi090W S 1.068.T10 S 1.OBB.m S 260.000 $ 1.029]91 0%
PHre S-O MuWn $ 3 A00 S 3.S353T1 IS 9835312 S 525.051 S 525.051 0%
PHreS-Caivmssianin S 19.000 f 126.511 S 126.581 S 122.555 $ 122.955 0%
Po005-Cbm-ON S 31.M $ 31.635 $ 31.635 3 30.638 3 30.638 0%
P80Y]-GOnli S M5.000 S S S
PROJKTTOTAL $ 5,1T;000 S 5.1Z2.5B1 S 5172A91 S 1.038.617 S 779.381 $ 1.817.998
ReimWrseele casts
PROJECTNET $ 5,173,000 1 S 6.172.691 S 5,172.591 1 S 1,038.617 $ 779.381 1 S 1,617,998 1 3 66803 1 I%
PSAJOontr t
Oesi nPEA S 220.967 S 856.153 1 $ 888.153 1 S 770.381 1 S 779.S81
C....on CaN $ 3226.022 1$ 3.M.028 S 3.M6,020 1 S -IS
EDWSAN]BWIW
PDC COMMITTEE MeetlngDole roBd.ofoil.
03 0 OS 03 OS
AGENDA REPORT Item Number Item Number
PDC06-28 130)
Orange County Sanitation District
Misc.B
�y Support Projects
FROM: David Ludwin, Director of Engineering
Originator: Christopher MacLeod, Project Manager
SUBJECT: TENANT IMPROVEMENT FOR ENGINEERING/CONSTRUCTION
TRAILER COMPLEX'C', JOB NO. FE04-36
GENERAL MANAGER'S RECOMMENDATION
Reject all bids submitted for Tenant Improvement for Engineering/Construction
Trailer Complex 'C', Job No. FE04-36, based on bids exceeding engineer's
estimate.
SUMMARY
• This project was publicly advertised December 14, 2004 and subsequently
bid on January 11, 2005.
• The Orange County Sanitation District (Sanitation District) received four bids
ranging from $658,680 to $949,846. All bids received were above the
engineer's estimate of$300,000.
• Staff concluded that the immediate organizational needs can be met with the
existing facilities if some staff are assigned to project specific offices at Plant
Nos. 1 and 2.
• Staff recommends rejection of all bids.
PROJECT/CONTRACT COST SUMMARY
Please see the attached Budget Information Table.
BUDGETIMPACT
® This item has been budgeted. (une Item:200512006 CIP Budget,section No.6,page 109)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
A total project budget of$478,246 was allocated from the Sanitation District's
Facilities Engineering budget for FY2004-2005 and carried through to
FY2005-2006 as shown in the attached Budget Information Table.
Page 1
ADDITIONAL INFORMATION t
The existing engineering trailer complex is located in the NE corner of Ward
Street and Garfield Avenue on the Sanitation District property. This project was
intended to accommodate staffing additions to the Sanitation District's
Engineering Department Construction Management, IPMC, and Project
Management Office teams. Grouping staff in one area increases efficiency,
communication, and collaboration for all Sanitation District CIP projects.
Staff concluded that the bids received are too high, beyond reasonable
justification and past costs for similar facilities.
ALTERNATIVES
None
CEQA FINDINGS
NA
ATTACHMENT
1. Budget Information Table
2. Bid Summary
CMM:ba:kf
HMIglobaMgenda Draft ReportaIPMFE04-96 Agenda Repots Reject aidecim
Page 2
BUDGET INFORMATION TABLE
ADDITION TO EXISTING ENGINEERING TRAILER COMPLEX AT PLANT NO. 1
JOB NO. FE04-36
PRoPoeEO
ORIGINAL CURRENT eUIXIE PROPOSED FUNDS AUTNORRfiD MIS PROPOSED TOTAL ESTIMATES ESjIr*d �u
PROJSCTIPNASE AUTNORVEO PROJECT INCREASE RSVISEO TO DATE AUTNORVATION AUTNORI7ARONj EXPENDIiORE ,ERPENbi, TO
-BUDGET BUDGET BUDGET REQUEST TO DAT@ � UATE�'A) .L
mecReASE
ii
Phase 1 -Pro'ect Development $ 1,800 S 1,800 $ - $ 1,800 $ 1,800 $ 1,800 $ 0%
Phase 2-Preliminary Design $ 2250 $ 2250 $ - $ 2250 $ 2250 $ 2250 $ 1499 67%
Phase 3-Des n $ 27 250 1 $ 27.250 $ - $ 27,250 $ 2.250 $ 2,250 1 $ 65.816 2925
Phase 4-Construction $ 366,643 $ 366,643 $ - $ 366,643 $ 8,550 $ 8,550 $ 8,550 100%
Phase 5-Commissionin $ - $ - $ $ S - $ 0%
Phase 6-Close-Out $ 1350 $ 1350 $ - $ 1350 $ 1350 $ 1350 $ 0%
Phase 7-Contingency $ 78.953 $ 78,953 $ - $ 78,953 $ 78,953 $ - $ 0%
PROJECT TOTAL $ 478.246 $ 478.246 $ - $ 478,246 : $ 95,153 $ 16,200 $ 75,865 468%
Reimbursable Costs $ - $ - $ - $ $ - $ - $ - $ p%
PROJECT NET 1 $ 478,246 $ 478,246 1 $ - $ 478,246 $ 95.153 1 $ - $ 16.200 $ 75,885 1 468%
PSAIConlracl
Desi n/Const.SucDort PSA $ 25 000 $ 31 500 $ S 31,500 7 $ 31.500 1 $ - $ 31,5001 $ 31,5001 100%
Construction Contract Is - Is - Is - Is Is - Is - $ - Is 0%
EDMS:=600015
V 1 i
BID SUMMARY
ADDITION TO EXISTING ENGINEERING TRAILER COMPLEX AT PLANT NO.1
JOB NO. FE04-36
Dalke&Sons Construction,Inc. MSH Construction Co. Inc. R.Jensen Company
Item Approx. City Unit Total Unit Total Unit Total
No. Price Price Price Price Price Price
1 1 Lump Sum $ 3,680.00 $ 3,680.00 $ - $ - $ 10,000.00 $ 10,000.00
2 1 Lump Sum $ 655,000.00 $ 655,000.00 $ 705,290.00 $ 705,290.00 $ 699,000.00 $ 699,000.00
Subtotal $ 658,680.00 $ 705,290.00 $ 709,000.00
'Add(+)or Delete(-) $ - $ - $ - $ -
YdtdMpjM t teidl Ili ' ° 'I;ii':I ii $ 658,seo.00 $ os,z9o:oo $ 709,000.00
Dalke&Sons Construction, Inc. MSH Construction Co.Inc. R.Jensen Company
Pacific General Contractors COMPANY NAME COMPANY NAME
Item Approx. City Unit Total Unit Total Unit Total
No. Price Price Price Price Price Price
1 1 Lump Sum $ 10,000.00 $ 10,000.00 $ - $ - $ - $ -
2 1 Lump Sum $ - $ 949,846.00 $ $ - $ - $ -
Subtotal $ 959,846.00
*Add (+) or Delete(-) $ - $ -
AN AW0400Ildffi,.. Illllllil ' il�lib $i! 950,846.00 $ $ .
Pacific General ContraE COMPANY NAME COMPANY NAME
003785087
1 Of 1 2/23/2006
0
MINUTES OF THE REGULAR JOINT MEETING OF THE
FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE & STEERING COMMITTEE
Orange County Sanitation District
Wednesday, March 1, 2006, 7:00 p.m.
Ajoint meeting of the Finance, Administration and Human Resources Committee and the
Steering Committee of the Orange County Sanitation District was held on March 1, 2006, at 7:00
p.m., in the Sanitation District's Administrative Office.
(1) The roll was called and a quorum declared present, as follows.
FAHR COMMITTEE MEMBERS: STAFF PRESENT:
DIRECTORS PRESENT: Jim Ruth, Interim General Manager
Darryl Miller, Chair Lisa Tomko, Director of Human Resources
Mike Duvall, Vice Chair Lorenzo Tyner, Director of Finance
Bill Dalton Bob Ghirelli, Director of Public Affairs
Rich Freschi Jeff Reed, Human Resources Manager
Phil Luebben Mike White, Controller
Joy Neugebauer Lilia Kovac, Committee Secretary
James W. Silva Penny Kyle, Board Secretary
Mark Waldman Paul Loehr, Human Resources Supervisor
Jim Ferryman, Vice Board Chair
OTHERS PRESENT:
Brad Hogin, General Counsel
DIRECTORS ABSENT.
Steve Anderson, Board Chair
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Chair Miller had no report.
(5) REPORT OF THE GENERAL MANAGER
Jim Ruth, Interim General Manager, had no report.
Minutes of the Regular Joint meeting of the Finance,Administration and Human N
Resources Committee and Steering Committee Meeting
March 1, 2006
Page 2
(6) REPORT OF DIRECTOR OF FINANCEITREASURER
Director of Finance, Lorenzo Tyner, reported that the Sanitation District has held its bond rating
at a strong "AA" rafing, with a high quality rating by all standards.
(7) REPORT OF DIRECTOR OF HUMAN RESOURCESIPUBLIC INFORMATION OFFICE
Lisa Tomko, Director of Human Resources, reported that the workers' compensation notification
process report will be submitted to the FAHR Committee in April. She also reported that the regular
OSHA Incidence Rates and Workers' Compensation Claims and Costs Report was not included in
the committee package, as no substantive change occurred since the last update. The report will be
provided in April.
(8) REPORT OF GENERAL COUNSEL
Brad Hogin, General Counsel, had no report.
(9) CONSENT CALENDAR ITEMS
a. Approve minutes of the February 8, 2006, Finance,Administration and Human
Resources Committee meeting.
b. FAHR06-11 Receive and file Employment Status Report as of February 9,2006.
C. FAHR06-12 Recommend to the Board of Directors to approve SAFETY-POL-101, 102,
107, 202, and 402, and 405 as provided for in Resolution No. OCSD 02-5,
regarding the District's Injury and Illness Prevention Program Policy.
MOTION: It was moved, seconded and duly carried to approve the recommended
actions for items specified as 9(a), (b), and (c) under Consent Calendar.
Director Freschi abstained on Item 9(a).
END OF CONSENT CALENDAR
(10) ACTION ITEMS
No items to be considered
(11) INFORMATIONAL PRESENTATIONS
a. FAHR06-13 Draft Independent Rate Study
Lorenzo Tyner, Director of Finance, reported to the Committee members
that the draft rate study completed by Bartle Wells Associates has been
made available to the Board and the public. A February scoping meeting
y Minutes of the Regular Joint meeting of the Finance,Administration and Human
Resources Committee and Steering Committee Meeting
March 1, 2006
Page 3
which was attended by industry members, will be followed up with a
meeting in April. A key sheet will be provided to the committee for
definition of key information contained in the study report.
b. FAHR06-14 Parcel Review—Top Commercial and Industrial Users Increases
Lorenzo Tyner discussed the results of the non-residential parcel review
previously presented to the FAHR Committee and provided a list of users
with the largest total dollar impact.
C. FAHR06-15 General Manager and Executive Management Team Purchase Approvals
Lorenzo Tyner presented a volume summary of purchases at the
Executive Management Team level. A breakdown will be prepared for
purchases approved by EMT in$10,000 increments. Similar size
agencies will be surveyed for comparison and consistency, and
recommendations will be submitted for oonsideration if a change is
warranted.
d. FAHR06-16 2006-07 and 2007-08 Budget Assumptions
Lorenzo Tyner informed the committee members that budget assumptions
may still be subject to revision due to two upcoming CIP Oversight
workshops scheduled in March that may alter the overall plan. Budget
assumptions may be reconsidered after all Board members have an
opportunity to attend a CIP Oversight workshop.
e. FAHRO6-17 COP Series 2006 Debt Repayment
Lorenzo Tyner presented the debt repayment savings calculation based
on the accelerated repayment of debt.
f. FAHROB-18 Labor Relations Program Update/Employee Compensation Overview.
Paul Loehr, Human Resources Supervisor, summarized the update on the
preparation process for the 2007 labor negotiation process, which
included the following Phase 1 items: 1) Review of collective bargaining
agreements; 2). Providing employment and labor relations training; 3).
Reestablishing the labor/management committee; and, 4). Timeline detail.
In addition, an overview of employee compensation program was
provided.
(12) CLOSED SESSION
There was no closed session.
Minutes of the Regular Joint meeting of the Finance, Administration and Human (�
Resources Committee and Steering Committee Meeting
March 1, 2006
Page 4
(13) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
There were none.
(14) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(15) CONSIDERATION OF UPCOMING MEETINGS
The next FAHR Committee meeting is scheduled forApril 12, 2006, at 5:00 p.m.
(16) ADJOURNMENT
The Chair declared the meeting adjourned at 6:10 p.m.
Submitted by:
Lille K vac
Committee Secretary
H:WeptWgendaWMRWAHR2006W306t030106 FAHR Minutec.dac
FAHR COMMITTEE M03/ee"n,01/2006= TO03/B22/20:O.Mgr.
AGENDA REPORT Item Numbe Iem Numbe
Orange County Sanitation District
FROM: Lisa L. Tomko, Director of Human Resources
Originator: James Matte, Safety and Health Supervisor
SUBJECT: SAFETY POLICY, INJURY AND ILLNESS PREVENTION PROGRAM
POLICY
GENERAL MANAGER'S RECOMMENDATION
Approve SAFETY-POL-101, 102, 107, 202, 402, and 405 as provided for in Resolution
No. OCSD 02-5, regarding the District's Injury and Illness Prevention Program Policy.
SUMMARY
The District is submitting one new Safety and Health policy and revising five (5) of its
Safety and Health Policies to reflect modifications brought about by regulatory changes,
and internal administrative decisions.
PRIOR COMMITTEE/BOARD ACTIONS
Approval of Resolution No. OCSD 02-5 regarding the District's Injury and Illness
Prevention Program.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
The written Injury and Illness Prevention Program Policy (SAFETY-POL-101) is being
revised to update policy requirements in accordance with revised workplace procedures
and to remove obsolete definitions. These changes are designed to make the policy
more effective as a best management practice. There are no increased administrative
or material costs associated with these changes.
r
OCSD is revising its written Personal Protective Equipment Policy (SAFETY-POL-102)
to establish a risk based program for the use of personal protective equipment as is
done in practice. These revisions also mandate the use of electrically safe fabrics by
personnel exposed to electrical currents which have the potential to provide an electrical
arc. There are no increased administrative costs associated with these changes.
OCSD is revising its written Hazard Communication Policy (SAFETY-POL-107) to add
specific requirements for the Environmental Sciences Laboratory to ensure consistency
with OCSD's Chemical Hygiene Program Policy (SAFETY-POL-113). These changes
are considered a best management practice and go beyond what is required in Cal-
OSHA regulations. There are no increased administrative or material costs associated
with these changes.
OCSD is revising its written Accident Investigation Policy (SAFETY-POL-202) to
establish a root cause investigation model and define levels of property damage which
will trigger an investigation as is done in current practice. These changes are
considered a best management practice and go beyond what is required in Cal-OSHA
regulations. There are no increased administrative or material costs associated with
these changes.
OCSD is revising its written Workers' Compensation Benefits Policy (SAFETY-POL-
402) to clarify the time limits for sick-industrial leave and formally establish an approval
system for employees charging to the sick-industrial charge number. These changes
are considered a best management practice and will improve the administration of
workers' compensation. There are no increased administrative or material costs
associated with these changes.
OCSD is adding a new administrative policy regarding Safety and Health Training
(SAFETY-POL405). In April 2005, the administration of Safety and Health was
transferred from the Employee Development Division to the Safety and Health Division.
This new policy outlines roles and responsibilities for Safety and Health training. This
policy is a best management practice. There are no increased administrative costs
associated with these changes.
These documents are presented for your review and adoption represents the Districts
revised written Safety and Health Policies that conforms to applicable regulations found
in the California Code of Regulations.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
H'aoOlUgMdd'BCwa P9enaa Rery�52GW Bov,E/pMEe 6 Ogeny flgvla`p)(6JIem lal�l s✓aYd IWY�Vdnea.4c
flmiva b30ro� Page 2
ATTACHMENTS
1. Injury and Illness Prevention Program Policy (SAFETY-POL-101) Rev 4
2. Personal Protective Equipment Program Policy (SAFETY-POL-102) Rev 1
3. Hazard Communication Program (SAFETY-POL-107) Rev 1
4. Accident Investigation Policy (SAFETY-POL-202), Rev 2
5. Workers' Compensation Benefits Policy (SAFETY-POL-402), Rev 1
6. Safety and Health Training Policy (SAFETY-POL-405) Rev 0
H'W�enEe�EfgeMe R�tq 'ft mnewum Vl.m 1Me)Me aH-M f'mes
R .gyp,,: �, Page 3
ORANGE COUNTY SANITATION DISTRICT
Safety and Health Division
SAFETY-POL-101
Injury and Illness Prevention Program
APPROVALS
Approved by: Date:
General Manager
Approved by: Date:
Director of Human Resources Manager
Approved by: Date:
Human ResourceslSafey Manager
PROCEDURE REVISION HISTORY
Rev. Date Approval
0 01/272002
1 09252002
2 02252004
3 06242004
4 0322/2006
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and Health
Division public folder to ensure that they have the latest version.
Injury and Illness Prevention Program 8AFM-POL-101
Contents
1. Purpose...............................................................................................4
2. Definitions...........................................................................................4
3. Requirements......................................................................................5
3.1 Program Responsibilities..........................................................................6
3.1.1 Administration .....................................................................................6
3.1.2 Management and Supervision.............................................................7
3.1.3 Employee............................................................................................7
3.1.4 Employee Safety Rules.......................................................................8
3.2 Hazard Awareness and Analysis............................................................10
3.2.1 Pre-Use Analysis...............................................................................10
3.2.2 Comprehensive Safety and Health Surveys......................................10
3.2.3 Periodic Self Inspections of Work Areas...........................................11
3.2.4 Routine Hazard Analysis...................................................................11
3.2.5 Employee Reports of Hazards ..........................................................11
3.2.6 Incident and Accident Investigations.................................................12
3.2.7 Pattern Analysis ................................................................................12
3.3 Hazard Prevention and Control..............................................................12
3.3.1 Professional Expertise.......................................................................12
3.3.2 Written Safety and Health Policies and Procedures..........................13
3.3.3 Process Controls and Personal Protective Equipment......................13
3.3.4 Emergency Preparedness and Planning...........................................13
3.3.5 Preventative Maintenance.................................................................14
3.4 Safety Training.......................................................................................14
3.4.1 Training Profiles................................................................................14
3.4.2 Employee Training ............................................................................15
3.5 Safety Communication...........................................................................15
3.5.1 Signage.............................................................................................15
3.5.2 SafetyLine.........................................................................................15
3.5.3 Safety Awareness for Everyone (SAFE) Bulletins.............................15
3.5.4 Memorandums..................................................................................16
3.5.5 Safety Intranet...................................................................................17
3.5.6 Verbal Communication......................................................................17
3.5.7 Safety Committee..............................................................................17
3.5.8 Safety Suggestion Box......................................................................17
3.5.9 Rewards and Recognition Programs.................................................17
3.5.10 Post Incident Safety Stand Down......................................................17
3.5.11 Safetygram........................................................................................18
Injury and Illness Prevention Program SAFETY�OL-101
i
3.6 Safety Policy Enforcement and Discipline..............................................18
3.6.1 Safety Policy Enforcement................................................................19
3.6.2 Discipline for Safety Policy Infractions...............................................19
3.7 Accident and Incident Investigations......................................................19
3.8 Recordkeeping.......................................................................................19
3.8.1 Inspection Records............................................................................19
3.8.2 Training Records...............................................................................19
3.8.3 Exposure Monitoring and Medical Records.......................................20
3.9 Integration of Safety Compliance Initiatives ...........................................20
3.10 Coordination of Contractor Programs.....................................................20
4. References ........................................................................................20
5. Attachments......................................................................................22
1. Purpose.............................................................................................24
2. Requirements....................................................................................24
2.1 Written Compliance Programs ...............................................................24
Number: SAFETY-POL-101
Orange County Sanitation OCSD Revision Number. 34 r
Injury and Illness Prevention Program Date: l ne 'w a-24—�, '^^" March 22,
2006
Approved by:
1. Purpose
Every California employer must establish, implement and
maintain a written Injury and Illness Prevention (IIPP) Program
and a copy must be maintained at each worksite. The
requirements for establishing, implementing and maintaining an
effective written Injury and Illness Prevention Program are
contained in Title 8 of the California Code of Regulations,
Section 3203 (8 CCR 3203). The purpose of this Injury and
Illness Prevention Program (IIPP) is to ensure OCSD
establishes implements and maintains a safety and health
program.
2. Definitions
CMMS Computerized Maintenance Management System
Imminent Hazard Any condition or practice in a place of employment that
constitutes a hazard which could reasonably be expected to
cause death or serious physical harm immediately or before the
imminence of the hazard can be eliminated through regular
enforcement procedures.
Injury and Illness A written program stating what the OCSD, management and
Prevention Plan employees will do with respect to safety.
Manager Employee who :
• manages, plans, supervises and coordinates the operations
and activities of one or more major OCSD divisions and
works under general direction or administrative direction of a
Department Director of the General Manager, exercising
discretion in applying general goals and policy statements
and in resolving organizational and service delivery problems
and;
• Organizes and directs the work of subordinate staff, and;
• Assumes significant responsibility for a variety of personnel
activities in such areas as selection, training and disciplinary
Rev. 4 Hard Copy Is Uncontrolled
Date 03/22/2006 4 of 31
h:\dept\agenda\board agenda reports\2006 board agenda 8 agenda reports\0306Utem 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
actions and;
• Assumes significant responsibility for the preparation and
administration of the assigned budget(s)
Process A series of actions or operations directed toward a result.
Program The person assigned the task of maintaining and auditing the
Administrator Injury and Illness Prevention Program
Red Tag A red colored tag placed by an employee prohibiting the use
tools or equipment because of the belief that the use of the tool
or equipment will result in an accident or injury.
Supervisor Employee who:
• Supervises, assigns and reviews the work of subordinates in
assigned sections or work units and;
Works under direction or general direction of higher level
supervisory or management staff, exercising discretion in
selecting appropriate resources to use in accomplishing
assigned work and;
Assumes responsibility for recommending a variety of
personnel actions in such areas as performance evaluation,
training, selection and disciplinary measures and;
Ensures that appropriate policies and procedures are
followed by subordinates and;
Monitors, coordinates and assists in developing the budget
for assigned area
Safety Committee A committee made up of employees representing OCSD
management and represented employees who meet to set
safety goals and objectives and to solve safety related issues
3. Requirements
The required elements listed below are the ten elements of the
Injury and Illness Prevention Program as required by the
California Occupational Safety and Health Administration (Cal-
OSHA). Speck details of each element may be found in
speck referenced standard operating procedures, where
applicable.
Rev. 3 4 Hard Copy Is Uncontrolled
Date 061240004 02/22/2005 5 of 31
h:\dept\agenda\board agenda reports\2006 board agenda &agenda reports\0306Vtem 14(b).safety &
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL401
3.1 Program Responsibilities r
This section outlines the responsibilities for the implementation
and maintenance of this Injury and Illness Prevention Program.
3.1.1 Administration
1. The Safety and Health Division (Safety) shall be responsible
for maintaining the written Injury and Illness Prevention
Program.
A. The Safety and Health Supervisor shall be the IIPP
Program Administrator.
2. The Executive Management team (EMT) shall ensure that
OCSD's safety programs have sufficient resources to
maintain a safe and healthful workplace. Resources include
but are not limited to:
A. A competent safety staff.
B. An adequate budget to maintain and improve the safety
and emergency response program.
C. An adequate budget for required controls to minimize
safety and health risks to OCSD personnel, suppliers
and the public.
D. An adequate budget for required personal protective
equipment as determined by Safety.
E. Time for OCSD staff to attend required safety training at
a frequency and duration determined by Safety.
3. The Safety and Health Division, in coordination with affected
divisions, shall be responsible for ensuring that safety
policy, safety procedures, safety programs and safe work
practices are developed.
4. Safety and Health Division personnel shall have the
authority to ensure that unsafe operations are stopped and
that unsafe tools and equipment are removed from service
in accordance with SAFETY-SOP-101.2, Red Tag Authority
or if they believe, in their professional judgment, an
imminent danger exists.
Rev. 34 Hard Copy Is Uncontrolled
Date OIW4/2004 02122/2005 6 of 31
h.\dept\agenda\board agenda reporW2006 board agenda &agenda reportsN0306\item 14(b).safety&
health policies-aft 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
v
5. OCSD's General Manager shall be responsible for ensuring
OCSD managers and supervisors comply with the
provisions of this IIPP and other safety and health
programs.
6. The Manager over the Safety and Health Division shall be
responsible for ensuring the IIPP and other safety and
health programs are implemented.
7. A copy of this IIPP shall be available to all employees either
in an electronic or hard copy format.
3.1.2 Management and Supervision
1. Management and supervision shall ensure employees are
provided with the proper tools and personal protective
equipment.
2. Management and supervision shall ensure employees follow
safe work practices, including but not limited to the wearing
of personal protective equipment.
3. Management and supervision shall ensure employees are
appropriately disciplined for infractions of safety rules,
policies, procedures and programs.
4. Management and supervision shall ensure periodic
inspections of work areas are completed and documented in
accordance with SAFETY-SOP-101.1, Periodic Workplace
Inspections.
5. Management and Supervision shall ensure that unsafe
operations are stopped and that unsafe tools and equipment
are removed from service in accordance with SAFETY-
SOP-101.2, Red Tag Authority.
6. Management and supervision shall ensure identified
hazards are reported, documented and corrected.
3.1.3 Employee
1. Employees shall comply with safe work practices, policies,
procedures and safety programs.
Rev. 34 Hard Copy Is Uncontrolled
Date 00F24=04 02/222005 7 of 31
hMep6agenda\board agenda mports\2006 board agenda &agenda reports\0306\item 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL401
v
2. Employees shall conduct daily inspections of their work area
to check for unsafe conditions. This includes but is not
limited to:
A. Personal protective equipment
B. Safety equipment such as fire extinguishers, safety
showers and eyewashes
C. Tools and equipment
D. Vehicles.
3. Employees shall correct unsafe conditions as soon as
possible, including the replacement of personal protective
equipment.
4. Employees shall report unsafe conditions that cannot be
corrected to supervision immediately and submit a CMMS
request.
5. Employees shall attend safety training at the scheduled
time.
6. Employees escorting contractors, vendors or visitors shall
ensure that the proper personal protective equipment is
used at all times and all safe work practices are observed.
3.1.4 Employee Safety Rules
OCSD has established a set of generic safety rules that apply to
all OCSD employees, visitors and contractors. Violators of these
rules can be subject to disciplinary action, contract termination
or removal from the site.
1. Maintain work area(s) in an orderly manner.
2. Obey all posted safety and traffic control signs and
markings.
3. Oil, grease, paint and other slippery substances are to be
cleaned up immediately.
4. Report all unsafe conditions to supervision or Maintenance
(through the Computerized Maintenance Management
System(CMMS System))
Rev.3 4 Hard Copy Is Uncontrolled
Date B612412004 02/22/2005 8 of 31
h:\dept\agenda\board agenda reports\2006 board agenda &agenda reportsk03O6Vtem 14(b).safety&
health policies-att 1.doc
Injury and Illness Preverdlon Program SAFETY-POL-101
1
5. Report all accidents to your supervisor, regardless of
severity of the accident.
6. Aisles and walkways are to be kept clear of tripping hazards
and obstructions at all times.
7. Do not operate tools or equipment that you have not been
trained to operate.
8. Engaging in horseplay or scuffling with fellow employees is
prohibited at all times.
9. Pay close attention to your surroundings and do not read
while walking.
10. Employees using prescription medication shall inform their
supervisor of the medication use, type and possible effects
when they report to work.
11. Walk only in designated walkways and roadways. Do not
take shortcuts through process or storage areas.
12. Do not block access to safety equipment, electrical panels,
fire extinguishers, etc.
13. Do not disconnect or over ride any machines interlock
device.
14. Do not walk around barricades, tape or other devices being
used to block access to unsafe conditions.
15. Do not smoke or use open flames in any area which has
been designated a "NO SMOKING" area.
16. Observe all CAUTION" and " DANGER" signs throughout
the plant.
17. Ladders are to be properly secured prior to use. When a
ladder cannot be secured, a fellow employee must hold it.
18. Operation of equipment or machinery without proper guards
and/or signaling devices is prohibited.
19. The unauthorized removal of guards or disconnecting of
signaling devices is prohibited.
20. Personal protective equipment, safety glasses, hard hats,
Rev. 3 4 Hard Copy Is Uncontrolled
Date 06/242004 02/22I2005 9 of 31
h:\dept\agenda\board agenda reports\2006 board agenda 8 agenda reports\0306titem 14(b).safety 8
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL401
a
hearing protection, etc, shall be wom in all areas where
required.
21. Extension cords shall not be used for installations for
periods longer than 66gUD week.
22. Extension cords shall be inspected for defects prior to use.
23. Always use the proper tool for the job.
3.2 Hazard Awareness and Analysis
OCSD has developed procedures for identifying and evaluating
work place hazards, including scheduled periodic inspections to
identify unsafe conditions and work practices. Inspection
guidelines may be found in SAFETY-SOP-101.1, Periodic
Workplace Inspection Procedures.
3.2.1 Pre-Use Analysis
Engineering, Operation and Maintenance, Process Engineering,
Facilities Maintenance, Purchasing or any other division
proposing any process change that has the potential to impact
the safety and health of OCSD employees, contractors or
Visitors shall, in coordination with Safety, conduct a pre-use
analysis to determine the Impact on safety 124 dse analysis
shall Jae ilfiin�lim"AFIPOT
Use Analym.
3.2.2 Comprehensive Safety and Health Surveys
The Safety and Health Division, in coordination with
management and supervision, shall determine the scope and
frequency for any comprehensive safety, health or industrial
hygiene surveys. Survey scope and frequency shall be based
upon:
1. Regulatory requirements.
2. Literature review for new information on recognized
hazards.
3. Whenever new substances, processes, procedures, or
Rev.3 4 Hard Copy Is Uncontrolled
Date 06F24Q004 02/2212005 10 of 31
h:ldephagendalboard agenda reportst2006 board agenda&agenda reports103061item 14(b).safely&
health policies-aft 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
v
equipment are introduced to the workplace that represent a
new occupational safety and health hazard.
4. Employee input when applicable.
5. The best judgment of Safety.
The frequency of inspections shall not exceed one inspection
per calendar quarter.
3.2.3 Periodic Self Inspections of Work Areas
1. Division management and supervision shall be responsible
for conducting periodic inspections of each work area to
identify and evaluate hazards.
2. Periodic inspections shall be conducted in accordance with
SAFETY-SOP-101.1, Periodic workplace Inspections.
Whenever new substances, processes, procedures, or
equipment are introduced to the workplace that represent a
new occupational safety and health hazard, supervision
and/or management shall contact Safety to assist in a pre-
Use Assessment. in aeGardsAde - _ ,
Pfe4ids lAa4ysis
4. Whenever a manager/supervisor is made aware of a new or
previously unrecognized hazard, Safety shall be contacted.
5. Division management and supervision shall not rely on
periodic inspections performed by other divisions or
committees as a substitute for required inspections.
3.2.4 Routine Hazard Analysis
The Safety Division routinely conducts hazard analysis of OCSD
operations and construction activities for jobs the Safety Division
deems hazardous and all confined space entries.
3.2.5 Employee Reports of Hazards
Employees are encouraged to report known and potential safety
and health hazards. Mechanisms for reporting these hazards
include:
Rev. 34 Hard Copy Is Uncontrolled
Date GIk412004 02/22/2005 11 of 31
h:\dept\agenda\board agenda reports\2006 board agenda&agenda reports\0306\ifem 14(b).safety&
health policies-aft 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
1. Reports to management and supervision
2. Reports through CMMS
3. Electronic mail (e-mail) to SafetyWne--a Safety and Health
staff
4. Safety Suggestion boxes
5. Safety and Health committee meetings
6. Reports to an employee's bargaining unit representative
7. Face to face meetings with Safety and Health staff.
3.2.6 Incident and Accident Investigations
Incident and accident investigations are conducted on all
incidents requiring a Property Disposition Report, all motor
vehicle accidents and all Cal-OSHA recordable injuries. Other
incidents may be investigated at the discretion of Safety.
Accident investigations shall be conducted in accordance with
SAFETY-POL-202, Accident Investigation and Reporting.
Incident and accident investigations are conducted on all
incidents involving $ 1,000.00 of property damage, all motor
vehicle accidents and all Cal-OSHA recordable injuries. Other
incidents may be investigated at the discretion of Safety.
Accident investigations shall be conducted in accordance with
SAFETY-POL-202, Accident Investigation and Reporting.
3.2.7 Pattern Analysis
Cal-OSHA logs and accident investigations shall be periodically
reviewed by Safety to determine if any accidents or near misses
have similarities.
3.3 Hazard Prevention and Control
Accidents are prevented through the timely recognition and
correction of hazards before someone is injured or property is
damaged.
Rev. 34 Hard Copy Is Uncontrolled
Dale 06f2492004 02/22/2005 12 of 31
h:ldeptlagenda\board agenda reports12006 board agenda &agenda reports103061item 14(b).safety&
health policies-aft 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
3.3.1 Professional Expertise
OCSD will ensure that safety and emergency response division
staff is adequately trained in the hazards inherent to a
wastewater treatment plant. This includes providing staff with
the resources necessary to perform assigned jobs, including but
not limited to the following:
1. Annual professional development
2. Certification maintenance as required by the certification
authority.
3. Professional memberships.
4. Reference materials, such as:
A. Books
B. Codes, laws, regulations and consensus standards
C. Internet access in accordance with established OCSD
policy.
3.3.2 Written Safety and Health Policies and Procedures
OCSD will develop and maintain safety policies, procedures and
programs to ensure compliance with applicable Federal OSHA
and Cal-OSHA requirements. Safety Policies and Procedure
titles may be found in SAFETY-SOP-000.1 Control of Polices,
Procedures, Programs.
3.3.3 Process Controls and Personal Protective Equipment
OCSD shall use engineering controls to reduce employee
exposures to physical and chemical hazards. Personal
protective equipment shall be used when engineering controls
are not feasible, have not been installed, or when emergency
situations dictate such use. OCSD shall provide all required
personal protective equipment, except as noted in SAF—=-
SOP-102.8, quipmen .
Rev. 24 Hard Copy Is Uncontrolled
Date 0I 124/2004 02/22/2005 13 of 31
h:\dept\agenda\board agenda reports\2006 board agenda &agenda reports\0306Wem 14(b).safety&
health policies-aft 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
3.3.4 Emergency Preparedness and Planning
OCSD has developed an Integrated Emergency Response Plan
designed to prepare OCSD and employees for all types of
emergencies, including but not limited to:
1. Medical emergencies
2. Fires
3. Earthquakes
4. Floods
5. High water flows
6. Utility outages
7. Hazardous materials spills
8. Threatened or actual terrorist activities
8.- ' Tsunamis
10. Workplace viol®rice inddents
3.3.5 Preventative Maintenance
The operations and facilities maintenance divisions have
developed a preventative maintenance program to ensure
critical equipment does not fail and that safety related equipment
is properly maintained. The CMMS system tracks the scheduled
maintenance of these items.
3.4 Safety Training
Safety training is required for all OCSD employees. New
employees shall receive a New Employee Safety Orientation to
familiarize them with the hazards of a wastewater treatment
plant and OCSD safety policies and procedures. Safety training
is typically based on job classification, hazards that will be
anticipated in a job and the employee's actual job duties.
3.4.1 Training Profiles
The Safety and Health Division shall meet with the manager or
Rev. 3 4 Hard Copy Is Uncontrolled
Date Q&4/2804 02/22/2005 14 of 31
hAdephagenda\board agenda reports12008 board agenda&agenda reportsl03081item 14(b).safely&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
supervisor of each employee to determine which safety training
classes shall be attended by each employee. Once a safety
training profile has been developed for an employee, the training
listed on the profile is mandatory. The Safety and Health
Division and manager/supervisor shall use the following criteria
to determine safety training requirements:
1. Job description
2. Actual job duties
3. The anticipated job tasks of the employee
4. Anticipated future job tasks
5. Regulatory requirements
6. OCSD requirements based on :
i. Previous job task requirements
ii. Best industry practices.
3.4.2 Employee Training
Employees shall receive safety training before they are required
to perform a task and at the frequency specified in specific
safety policies and procedures.
3.5 Safety Communication
OCSD utilizes several methods to communicate safety and
health requirements, safety warnings and safety tips to all
employees.
3.5.1 Signage
OCSD posts hazard-warning signs where necessary to
communicate safety and health requirements, safety warnings
and safety tips to all employees. Signage is posted in
accordance with Title 8 CCR §3340. Accident Prevention Signs.
Rev. 3 4 Hard Copy Is Uncontrolled
Date 0024 Q004 02/22/2005 15 of 31
h:\dept\agenda\board agenda reports\2006 board agenda & agenda reports\0306\item 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SA M-POL401
1*1814128881ffft OR Payday.
3.5.3 Safety Awareness for Everyone (SAFE) Bulletins
SAFE bulletins are issued on speck safety related items
explaining how something should be done, or explaining how
specific components of a safety program are to be implemented.
Requirements and guidelines for developing SAFE Bulletins may
be found in SAFETY-POL-103, Safety Awareness for Everyone
(SAFE) Bulletins.
1. SAFE Bulletins shall be considered OCSD policy for items
not covered by specific policies.
2. A list of SAFE Bulletins may be found in SAFE Bulletin 000,
List of SAFE Bulletins.
3. SAFE Bulletins shall be reviewed at least every 3 years.
4. SAFE Bulletins greater than three (3) years old shall not be
considered OCSD policy.
3.5.4 Memorandums
The Safety and Health Division will periodically issue
memorandums regarding specific safety, health and hazardous
waste issues.
1. Memorandums shall be limited to a single topic.
2. Memorandums may be issued for the following reasons:
To clarify an existing policy
To implement a new policy on an emergency basis
Memorandums implementing new policy
requirements shall only be in force until:
A new policy has been developed; or
A SAFE bulletin has been developed; or
A Ninety (90) daytime period has elapsed
To provide information
Rev. 34 Hard Copy Is Uncontrolled
Date 00f242004 02/22/2005 16 of 31
h:\deptlagenciMboard agenda reports\2006 board agenda &agenda reports\03061iterr 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
To offer recommendations
3. A memorandum shall not revoke or superoede an adopted
policy, unless authorized by the Director of Human
Resources and the General Manager by signature.
4. E-mail shall not replace a memorandum.
3.5.5 Safety Intranet
The Safety and Health Division maintains an intranet site where
employees can go to obtain information on safety and health
Issues.
3.5.6 Verbal Communication
Safety and Health Division staff is available for contact regarding
concerns over safety and health issues.
1. Verbal communication shall not be used to change OCSD
policy.
3.5.7 Safety Committee
OCSD has agreed to form a labor-management safety
committee to address work related safety concerns. In addition,
subject specific safety sub committees may be formed at any
time with the concurrence of the Labor-Management Safety
Committee to address specific safety concerns. Safety
Committees shall be governed in accordance with SAFETY-
SOP-000.7, Safety Committees.
3.5.8 Safety Suggestion Box
There are Safety Suggestion Boxes located around both Plant 1
and Plant 2. The purpose of the boxes is to allow employees to
submit suggestions to Safety either by identifying themselves or
anonymously.
Rev. 3 4 Hard Copy Is Uncontrolled
Date QW49004 02t22/2005 17 of 31
hAdepbagendatoard agenda reports12006 board agenda&agenda reports10306Utem 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL401
3.5.9 Rewards and Recognition Programs
The Safety and Health Division has developed a rewards and
recognition program for employees who go above and beyond
safe work practices and consistently display a positive safety
attitude.
3.5.10 Post Incident Safety Stand Down
A Safety Stand Down is a procedure in which all managerial
personnel shall order a review of pertinent safety requirements
for their employees. The review shall be a minimum of 30
minutes to discuss safety issues that affect their specific work
group or to discuss an incident that may have occurred on a
OCSD job site. The Safety Stand Down shall occur no later than
the next work shift following an incident.
A Safety Stand Down shall occur when any of the following
conditions occur:
1. An injury to an OCSD employee that requires a report be
made to Cal-OSHA.
2. A fatality that occurred to any persons on any OCSD job
site.
3. Any accident that results in the overnight hospitalization of 2
or more employees, OCSD personnel or contractor
personnel.
4. OCSD's General Manager, in consultation with the Safety
and Health Division determines the need for a Safety Stand
Down.
A. Department and Division Managers and Supervisors
may call for a Safety Stand Down at any time for their
respective department and/or division.
The Safety and Health Division shall be responsible for
disseminating information regarding any incident requiring a
Safety Stand Down and any additional information requested by
management.
Rev. 34 Hard Copy Is Uncontrolled
Date OF2412004 02122I2005 18 of 31
hMeptlagenda\board agenda reporW2006 board agenda &agenda reports\0306\item 14(b).safety&
health policies-att t.doc
Injury and Illness Prevention Program SAFETY-POL-101
3.5.11 Safetygram
Safetygrams are developed by the Safety and Health Division for
use by management and supervision as safety tailgate meeting
topics. The topics are designed to be approximately five (5)
minutes in length.
3.6 Safety Policy Enforcement and Discipline
All employees, including managers and supervisors, are
responsible for complying with safe and healthful work practices.
All employees are responsible for complying with safety rules,
policies and procedures.
3.6.1 Safety Policy Enforcement
Each employee has a responsibility to ensure that work is
performed in a safe manner. Employees shall report violations
of safety rules and policies in accordance with established
OCSD procedures.
3.6.2 Discipline for Safety Policy Infractions
Employees who violate safety rules, policies and procedures are
subject to disciplinary action, up to and including termination.
Discipline shall be implemented in accordance with established
OCSD policies, and bargaining unit MOUs where appropriate.
Supervision and management shall be responsible for
disciplining workers for failure to comply with safe and healthful
work practices.
3.7 Accident and Incident Investigations
All accidents and near misses shall be investigated promptly.
Accident and incident investigation shall be conducted in
accordance with Safety-POL-202, Accident Investigation and
Reporting.
Rev.3 4 Hard Copy Is Uncontrolled
Date 061249004 02122/2005 19 of 31
h:ldept\agendalboard agenda reportst2006 board agenda&agenda reportst0305Utem 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL401
3.8 Recordkeeping
Records shall be maintained in accordance with specific Cal-
OSHA requirements. Records not mentioned below are
maintained in accordance with speck policies and procedures.
3.8.1 Inspection Records
Records of safety inspections shall be kept 12 months after the
last item found deficient has been corrected. Copies of safety
inspections shall be kept in the Safety and Health Office at Plant
No. 1.
3.8.2 Training Records
Employee safety training records shall be maintained in Traiq�pg
Server; an electronic database. These records are retained for
the length of OCSD employment, plus five (5) years.
3.8.3 Exposure Monitoring and Medical Records
Exposure monitoring and medical records shall be retained in
accordance with SAFETY-POL-403, Access to Employee
Medical Records and Title 8 California Code of Regulations,
§3204. Access to Employee Exposure and Medical Records.
3.9 Integration of Safety Compliance Initiatives
One goal of OCSD's safety and health program is to ensure that
safety programs are not in conflict with one another. A second
goal is to ensure that OCSD's overall mission can be
accomplished while providing a safe and healthful work
environment and achieving overall compliance with all applicable
regulations and laws.
3.10 Coordination of Contractor Programs
OCSD requires all contractors that conduct business with the
OCSD to have a safety program in place and conform to OCSD,
state and federal requirements as required by approved
purchase orders, contracts and specifications. Project
Managers, Resident Engineers and Construction Inspectors who
Rev. 3 4 Hard Copy Is Uncontrolled
Date CO24/2004 02/22/2005 20 of 31
h:\dept\agenda\board agenda reporis\2006 board agenda &agenda reports\0306\item 14(b).safety&
health policies-aft 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
represent OCSD assigned to a project are responsible for
enforcing the safety and health requirements of the contract.
4. References
Title 8 California Code of Regulations, §3203. Injury and Illness
Prevention Program
Title 8 California Code of Regulations, §3204. Access to
Employee Exposure and Medical Records
Title 8 California Code of Regulations, §3340. Accident
Prevention Signs
California Labor Code, Sections 142.3, 4558 and 6401.7
California Government Code, Section 11346.
California Code of Regulations, Title 8, Division 1, Department of
Industrial Relations
California Code of Regulations, Title 22, Division 4.5 Hazardous
Waste Management
SAFETY-SOP-000.1, Control of Polices, Procedures, Programs
SAFETY-SOP-000.7, Safety Committees
SAFETY-SOP-101.1, Periodic Workplace Inspections
SAFETY-SOP-101.2, Red Tag Authority
SAFETY-POL-102, Personal Protective Equipment
SAFETY-POL-103, Safety Awareness for Everyone (SAFE)
Bulletins
SAFETY-POL-104, Permit Required Confined Spaces
SAFETY-POL-105, Hazardous Energy Control
SAFETY-POL-106, Hearing Conservation
SAFETY-POL-107, Hazard Communication Program
SAFETY-POL-108, Contractor Safety Programs
Rev. 3 4 Hard Copy Is Uncontrolled
Date QW240004 02/22/2005 21 of 31
h-..\dept\agenda\board agenda reports\2006 board agenda &agenda reports\030Wem 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
SAFETY-POL-109, Respiratory Protection Program
SAFETY-POL-110, Radiation Safety Program
SAFETY-POL-111, Chemical Hygiene Plan
SAFETY-POL-112, Integrated Emergency Response Program
SAFETY-POL-113 Exposure to Pathogens Program
SAFETY-POL-114 Hazardous Waste Management
SAFETY-POL-115 Backfjow Prevention
SAFETY-POL-201, Fire Prevention
SAFETY-POL-202, Accident Investigation and Reporting
SAFETY-POL-203, Ergonomics
SAFETY-POL-204, Fall Protection
SAFETY-POL-205, Electrical Safety
SAFETY-POL-301, Vehicle Safety Operations (including carts
and bicycles)
SAFETY-POL-302, Marine Safety
SAFETY-POL-303, Crane Safety
SAFETY-POL-304, Forklift Operation
SAFETY-POL401, Medical Examinations
SAFETY-POL-402, Workers' Compensation Benefits and Leave
SAFETY-POL-403, Access to Employee's Medical Records
SAFETY-POL-404, Return to Work Programs
5. Attachments
Attachment@ A: OCSD Safety and Health Programs
Rev.S 4 Hard Copy Is Uncontrolled
Date 0@24QO04 02I22/2005 22 of 31
h:klepl\agenda\board agenda report5\2006 board agenda &agenda reports\0306\item 14(b).safely&
health policies-aft t.doc
Injury and Illness Prevention Program SAFETY-POL-101
MaGhment A• Aese c to Safety Intranet Site
r
uttnn nn the
Mouse.
"Safety. Double Glick on "Safety".
double GliGidng an the butten.
Rev. 3 4 Hard Copy Is Uncontrolled
Date 06/24/2004 02/22/2005 23 of 31
h:Wept\agenda\board agenda reports\2006 board agenda &agenda reports\0306Vtem 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
Attachment 8 A: OCSD Safety and Health Programs
Contents
1. Purpose .............................................................................................24
2. Requirements....................................................................................24
2.1 Written Compliance Programs.........................................................................24
Rev. 34 Hard Copy Is Uncontrolled
Date 06124Q004 02/22/2005 24 of 31
hMep0agenda%oard agenda reportst2006 board agenda&agenda reportst0306Vtem 14(b).safety&
health policies-att i.doc
1 . Purpose
To promote a safe work environment for all employees and to
ensure the OCSD meets the safety-related legal requirements
for written compliance programs.
2. Requirements
It is the OCSD's policy to provide a safe work environment for its
employees. The OCSD is committed to ensuring compliance
with all safety-related legal requirements and providing the
necessary training to meet these requirements.
2.1 Written Compliance Programs
The written compliance programs, which are detailed in specific
Safety Policies, Procedures or Safety Programs (SPs), covered
by this policy are:
1. Injury and Illness Prevention Program
This program is mandated by Cal-OSHA CCR Title8, §3203,
Injury and Illness Prevention Program. To meet the intent of
this regulation, the OCSD has developed SAFETY-POL-101,
Injury and Illness Prevention Program and SAFETY-SP-101
OCSD Safety and Health Program. The program includes
information on safety commitment and responsibilities,
hazard recognition, hazard assessment and control, safety
communications, safety training, accident reporting and
investigation, safety committees, and recordkeeping.
2. SAFETY-POL-102, Personal Protective Equipment Program
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Section (§) 3380, Personal
Protective Devices. To meet the intent of this regulation, the
OCSD has developed SAFETY-POL-102 Personal
Protective Equipment. This program includes the
requirements for selection, use, and care for devices
designed for head, eye, body, hand, and foot protection.
Rev.4 Hard Copy Is Uncontrolled
Date 02/22/2006 25 of 31
hAdephagendalboard agenda reports12006 board agenda&agenda reports10306Utem 14(b).safety&
health policies-aft 1.doc
Injury and Illness Prevention Program SAFEfy-FOL-7o1
3. SAFETY-POL-103, Safety Awareness For Everyone (SAFE)
Bulletins
SAFE bulletins are bulletins issued on specific safety related
items explaining how something should be done, or
explaining how specific components of a safety program are
to be implemented. SAFE Bulletins shall be considered
OCSD policy for items not covered by specific policies.
SAFE Bulletins shall be reviewed at least every 3 years.
SAFE Bulletins older than 3 years old shall not be
considered OCSD policy. The policy for the development of
SAFE Bulletins may be found in SAFETY-POL-103, Safety
Awareness for Everyone (SAFE) Bulletins
4. SAFETY-POL-104, Permit Required Confined Spaces
This program is mandated by Cal-OSHA CCR Title 8, §
5157, Permit-Required Confined Spaces. To meet the intent
of the regulation, the OCSD has developed SAFETY-POL-
104, Permit Required Confined Spaces and SAFETY-SP-
104 Permit Required Confined Spaces. This program
includes the requirements for the entrant, attendant, entry
supervisor, and rescue team for confined space entry
activities.
5. SAFETY-POL-105, Hazardous Energy Control
This program is mandated by Cal-OSHA CCR Title 8, §
3314 Cleaning, Repairing, Servicing and Adjusting Prime
Movers, Machinery and Equipment. To meet the intent of
this regulation, the OCSD has developed SAFETY-POL-105,
Hazardous Energy Control Programs and SAFETY-SP-105
Hazardous Energy Control. This program includes the
requirements for working on or around equipment that is
energized or has the potential to contain residual energy.
6. SAFETY-POL-106, Hearing Conservation
This program is mandated by Cal-OSHA CCR Title 8, §
5097, Hearing Conservation. To meet the intent of this
regulation, the OCSD has developed SAFETY-POL-106,
Hearing Conservation Programs and SAFETY-SP-106
Hearing Conservation. This program includes the
requirements for designating areas where hearing protection
is required and the selection, use, and care for hearing
Rev. 34 Hard Copy Is Uncontrolled
Date 0152G2004 02122/2005 26 of 31
h:tdepfagendalboard agenda reponst2006 board agenda & agenda reportst0306\tem 14(b).safety&
health policies-all 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
protection devices.
7. SAFETY-POL-107, Hazard Communication Program
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Section (§) 5194, Hazard
Communication. To meet the intent of this regulation, the
OCSD has developed SAFETY-POL-501, Hazard
Communication. This program includes the requirements for
training, use, labeling, Material Safety Data Sheets (MSDS)
and employee training and education.
8. SAFETY-POL-108 Contractor Safety Programs
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Subchapter 4, Construction
Safety Orders. To meet the intent of this regulation, the
OCSD has developed SAFETY-POL-108, Contractor Safety
Programs. This program includes the requirements for
Contractor oversight for safety and health related issues by
the OCSD during the completion of contracts.
9. SAFETY-POL-109, Respiratory Protection
This program is mandated by Cal-OSHA CCR Title 8, §
5144, Respiratory Protection. To meet the intent of this
regulation, the OCSD has developed SAFETY-POL-109
Respiratory Protection Program. This program includes the
duties of the program administrator, supervisor, and
respiratory user. Also defined in the program are the
requirements for the selection, inspection, use,
maintenance, and storage of respiratory protection devices.
10. SAFETY-POL-110 Radiation Safety Program
This program is mandated by CCR Title 17, Division 1,
Chapter 5, Subchapter 4, Radiation and Cal-OSHA Title 8, §
5076, Radiation and Radioactivity, Administrative
Procedures. To meet the intent of the regulation, the OCSD
has developed SAFETY-POL-110 Radiation Safety Program.
This program includes the requirements for nuclear gauge
users, contractors, service representatives, and visitors who
enter into restricted areas where radioactive materials are
used or stored.
11. SAFETY-POL-111, Chemical Hygiene Plan
Rev. 34 Hard Copy Is Uncontrolled
Date O6/24/2004 02/22/2005 27 of 31
hAdept\agenda\board agenda reports\2006 board agenda&agenda reports\03061item 14(b).safety&
health policies-aft 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
This program is mandated by Cal-OSHA CCR Title 8, § 5191,
Occupational Exposure to Hazardous Chemicals in
Laboratories. To meet the intent of this regulation, the OCSD
has developed SAFETY-POL-111 Chemical Hygiene Plan
and Appendix B of the Laboratory Operating Procedures
Manual. This program includes the duties of the Chemical
Hygiene Officer, supervisor, and laboratory employee.
10. SAFETY-POL-112, Integrated Emergency Response
Program
This program is mandated by Cal-OSHA CCR Title 8, §
3220 Emergency Action Plan, § 3221 Fire Prevention Plan,
§ Hazardous Waste Operations and Emergency Response;
CCR Title 19, § 2620 at seq. and Health and Safety Code §
25500 at seq. Minimum Standards for Business, § 2400 et
seq. Standardized Emergency Management Systems; Title
22, § 66265.30 through 37, Preparedness and Prevention
Plan, § 66265.50 through 56, Contingency Plan and
Emergency Procedures; 40 Code of Federal Regulations
(CFR) Part 112, Spill Prevention Control and
Countermeasure Plan. To meet the intent of all the
regulations, the OCSD has developed SAFETY-POL-112,
Integrated Emergency Response Plan and SAFETY-SP-
112 Integrated Emergency Response Plan. This plan is
divided into Volumes I and II. Volume I, Emergency
Preparedness, contains the specific plans for preparing for
an emergency. Volume Il, Emergency Procedures,
contains the specific plans and procedures to be
implemented in response to an emergency.
13. SAFETY-POL-113, Exposure to Pathogens Program
(Bloodborne Pathogens)
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Section (§) 5193, Bloodbome
Pathogens for our Emergency Medical Team. Other aspects
of the program are voluntary, but follow best industry
practices. To meet the intent of the regulation referenced
above, the OCSD has developed SAFETY-POL-113
Exposure to Pathogens and SAFETY-SOP-113-1 Exposure
Control Plan.
14. SAFETY-POL-114, Hazardous Waste Management
Rev. 3 4 Hard Copy Is Uncontrolled
Date Olk,I 2004 02/22/2005 28 of 31
h:\dept\agenda\board agenda reports\2006 board agenda 8 agenda reports\0306Vtenn 14(b).safety 8
health policies-aft 1.doc
Injury and Illness Preverdlon Program SAFETY-POL-101
This program is mandated by Cal-EPA, California Code of
Regulations (CCR), Title 22, Division 4.5 Hazardous Waste
Management. To meet the intent of this regulation, the
OCSD has developed SAFETY-POL-502 Hazardous
Substance Management. This program includes the
requirements for identification, packaging, labeling and
disposal of hazardous waste. Requirements for training
employees are also included
15. SAFETY-POL-115 Backflow Prevention Program
This program is mandated California Department of Health
Services Regulations, found in Titles 17 and 22 of the
California Code of Regulations that require specific actions
and practices be performed when safeguarding potable water
systems.
16. SAFETY-POL-201, Fire Prevention Programs
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Sections 13220, Emergency
Action Plan, 3221, Fire Prevention Plan and 6150-6184, Fire
Protection. To meet the intent of this regulation, the OCSD
has developed SAFETY-POL-201 Fire Prevention. This
program includes the requirements for the training of
employees on evacuations, and fire systems maintenance,
testing and upkeep.
17. SAFETY-POL-202, Accident Investigations
This program is mandated by Cal-OSHA, California Code of
Regulations, Title 8, Sections §330, Definitions, §3203.
Injury and Illness Prevention Program; Title 8 California
Code of Regulations, Chapter 7, Subchapter 1. Occupational
Injury or Illness Reports and Records and Title 8 California
Code of Regulations Chapter 3.2. , Subchapter 2, Article 3.
Reporting Work-Connected Injuries, §342. Reporting Work-
Connected Fatalities and Serious Injuries. To meet the
intent of this regulation, the OCSD has developed SAFETY-
POL-202 Accident Investigation. This program includes the
requirements for the training of employees and supervisors
on reporting and documenting industrial near misses and
accidents.
Rev. 34 Hard Copy Is Uncontrolled
Date OW2412094 o2/22/2005 29 of 31
h:Idep0agendalboard agenda reports12006 board agenda & agenda reportsT3061itenn 14(b).safety&
health policies-att l.doc
Injury and Illness Prevention Program SAFETY-POE-1 0-1
18. SAFETY-POL-203, Ergonomics
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Section (§) 5110, Ergonomics.
To meet the intent of this regulation, the OCSD has
developed SAFETY-POL-203 Ergonomics. This program
includes the requirements for evaluation of workstations, the
selection, use, and care for devices designed to reduce
hazards in the work place that can lead to repetitive motion
and cumulative trauma injuries.
19. SAFETY-POL-204, Fall Protection
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Chapter 4, Subchapter 4,
Construction Safety Orders and Subchapter 7, General
Industry Safety Orders. To meet the intent of this regulation,
the OCSD has developed SAFETY-POL-204, Fall Protection.
This program includes the requirements for use of fixed,
portable and personal fall protection equipment.
20. SAFETY-POL-205, Electrical Safety
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Sections (§) 2299-2974, Electrical
Safety Orders. To meet the intent of this regulation, the
OCSD has developed SAFETY-POL-205 Electrical Safety.
This program includes the requirements for electrical
installations, work practices when working on electrical
equipment and the required personal protective equipment.
21. SAFETY-POL-301, Vehicle Safety
This program is mandated by Cal-OSHA, as a general
requirement of the OCSD's Injury and Illness Prevention
Program. To meet the intent of this regulation, the OCSD
has developed SAFETY-POL-301, Vehicle Safety. This
program includes the requirements for vehicle inspection,
vehicle maintenance and driver surveillance.
22. SAFETY-POL-302, Marine Safety
This program is mandated by Cal-OSHA, as a general
requirement of the OCSD's Injury and Illness Prevention
Program. To meet the intent of this regulation, the OCSD
Rev. 3 4 Hard Copy Is Uncontrolled
Date OF24QD04 02/22/2005 30 of 31
h.\dept\agenda\board agenda reports\2006 board agenda &agenda reports\0306\item 14(b).safety 8
health policies-att i.doc
Injury and Illness Prevention Program sAFETY-POL-701
has developed SAFETY-POL-302, Marine Safety.
23. SAFETY-POL-303, Crane Safety
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Chapter 4, Subchapter 7, Group
13, Cranes and Other Hoisting Equipment. To meet the
intent of this regulation, the OCSD has developed SAFETY-
POL-303, Crane Safety. This program includes the
requirements for training of personnel, inspection and
maintenance of cranes.
24. SAFETY-POL-304, Forklift Operation
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Article 25, Industrial Trucks. To
meet the intent of this regulation, the OCSD has developed
SAFETY-POL-304, Forklift Operation. This program
includes the requirements for training of personnel,
inspection and maintenance of forklifts.
25. SAFETY-POL-401, Medical Programs
This program is mandated by several different Cal-OSHA
standards in California Code of Regulations (CCR), Title 8,
Chapter 4, subchapter 7, General Industry Safety Orders.
To meet the intent of this regulation, the OCSD has
developed SAFETY-POL-401, Medical Examinations. This
program includes the requirements for conducting medical
surveillance on employees exposed to potentially hazardous
work environments.
26. SAFETY-POL-402, Workers' Compensation Benefits and
Leave Program.
This program is represents the OCSD's compliance with the
requirements of the California Code of Regulations, Title 8,
Chapter 4.5 and 8, relating to Workers' Compensation.
27. SAFETY-POL-403,Access to Employee Medical Records
This program is mandated by Cal-OSHA, California Code of
Regulations (CCR), Title 8, Section (§) 3204, Access to
Employee Medical Records. To meet the intent of this
regulation, the OCSD has developed SAFETY-POL-403,
which instructs employees how to access their
Rev.34 Hard Copy Is Uncontrolled
Date OS2402004 02122/2005 31 of 31
h:%dephagendatboard agenda repots12006 board agenda&agenda reports103061item 14(b).safety&
health policies-att 1.doc
Injury and Illness Prevention Program SAFETY-POL-101
occupationally related medical files.
28. SAFETY-POL-404, Return to Work Programs
This program is a best industry practiced designed to return
injured employees back to work on restricted duty. This
program results in unspecified costs savings to the OCSD in
terms of reduced workers compensation benefits, reduced
disability payments and reduced costs associated with hiring
temporary employees and overtime.
29.SAFETY POL-40— Safelv`atiilAeaiRTFamini;i dlmiNitratio'n
..
This program.is ;a best+industrubracticeb`that.exulams how
the'safety" and' =heaNh training ipro4ranr^is managed and
implemented.
Rev. 3 4 Hard Copy Is Uncontrolled
Date 06/2412004 02122/2005 32 of 31
hMeptlagendalboard agenda reports12006 board agenda 8 agenda reports10306Utem 14(b).safety 8
health policies-att 1.doc
ORANGE COUNTY SANITATION DISTRICT
Safety and Health Division
SAFETY-POL-102
Personal Protective Equipment Policy
APPROVALS
Approved by: Date:
Director of Human Resources
Approved by: Date:
Manager,Human Resources
Approved by: Date:
Safety Supervisor
PROCEDURE REVISION HISTORY
Rev. Date Approval
0
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and Health
Division public folder to ensure that they have the latest version.
Personal Protective Equipment Polley SAFETY-POL-102
Contents
1. Purpose ...............................................................................................4
2. Definitions ...........................................................................................4
3. Requirements......................................................................................5
3.1 General ....................................................................................................5
3.2 Safety and Health Division .......................................................................5
3.3 Management and Supervision..................................................................6
3.4 Purchasing and Warehouse.....................................................................6
3.4.1 Purchasing..........................................................................................6
3.4.2 Warehouse..........................................................................................7
3.5 Employees ...............................................................................................7
3.6 Contractors and Visitors...........................................................................7
4. Personal Protective Equipment Usage..............................................8
4.1 Safety Glasses.........................................................................................8
4.2 Eye and Face Protection..........................................................................8
4.3 Head Protection .......................................................................................9
4.4 Gloves....................................................................................................10
4.5 Uniforms.................................................................................................10
4.6 Footwear................................................................................................10
4.7 Electrical Safety Equipment...................................................................11
4.8 Respiratory Protection............................................................................12
4.9 Hearing Protection..................................................................................12
4.10 Other Personal Protective Equipment....................................................12
5. Personal Protective Equipment Requirements...............................12
5.1 Eye and Face Protection........................................................................13
5.2 Head Protection .....................................................................................13
5.3 Uniforms and Apparel.............................................................................13
5.4 Footwear................................................................................................13
5.5 Electrical Safety Equipment...................................................................14
5.6 Respiratory Protection............................................................................16
5.7 Hearing Protection..................................................................................15
5.8 High Visibility Clothing............................................................................15
5.9 Other Personal Protective Equipment....................................................15
6. Training Program..............................................................................15
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 2 of 18
h:\dept\agenda\board agenda reports\2006 board agenda & agenda reports\0306\item 14(b).safety&
health policies-att 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
6.1 Personal Protective Equipment Training Program .................................15
6.2 Program Administration and Review......................................................16
6.2.1 Program Administration and Review Process...................................16
7. References ........................................................................................17
8. Attachments......................................................................................18
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 3 Of is
h:\dept\agenda\board agenda reports\2006 board agenda&agenda reportsX0306\item 14(b).safety&
health policies-aft 2.doc
Number: SAFETY-POL-102
Orange County Sanitation District
Revision Number: 1
Personal Protective Equipment Policy Date: March 22, 2006
Approved by: Lisa Tomko
1 . Purpose
Employees at the Orange County Sanitation District (district)
may be exposed to a variety of physical and chemical hazards
that cannot be controlled by engineering methods. In these
instances, employees, contractors and visitors are required to
wear personal protective equipment in accordance with this
document and the District's written Personal Protective
Equipment Program (SAFETY-SP-102.1). SAFE Bulletins
supplement this information.
The purpose of this Personal Protective Equipment Policy is to
establish a program that will protect employees from potentially
harmful environments that cannot be controlled utilizing
engineering controls and establishing the requirements for the
selection, use, care and maintenance of personal protective
equipment. This policy also establishes the training
requirements for users of personal protective equipment.
This program applies to all District employees, contractors and
visitors on District sites.
2. Definitions
Construction Site An area delineated by the contractor and/or Construction
Management or an area where physical delineation is not
feasible, the construction site shall be defined as the area within
25 feet of any construction work that is in progress.
Plant Process An area, structure or pipe within OCSD facilities where
Area wastewater, biosolids, digester gas, or grit are collected, treated,
stored, transported or discharged.
Rev. 0 Hard Copy Is Uncontrolled
Date March 22, 2006 4 of 16
h:ldeptlagenda\board agenda reports\2006 board agenda & agenda reports\030Rtem 14(b).safety&
health policiesatt 2.doc
Personal ProtecWe Equipment Polly SAFETY-POL-102
3. Requirements
The District shall establish a Personal Protective Equipment
Program that will protect employees from potentially harmful
environments that cannot be controlled utilizing engineering
controls. This program shall establish the requirements for the
selection, use, care and maintenance of personal protective
equipment. This policy also establishes the training
requirements for users of personal protective equipment.
3.1 General
1. Personal protective equipment shall be provided to
employees at no cost to the employee within the
requirements of this program.
2. Personnel shall wear personal protective equipment when
working in areas posted to wear specific personal protective
equipment and when required by the personal protective
equipment program.
3. Non-district personnel shall wear safety glasses and head
protection at all times when in plant process areas,
construction sites and pump stations.
4. Personal protective equipment shall be selected based on a
workplace survey of potential and known hazards.
3.2 Safety and Health Division
1. Specify personal protective equipment based on the
hazards an employee may be reasonably expected to be
exposed to in a work environment.
2. Coordinate with appropriate divisional management-
supervision and identify areas, processes and specific job
activities in which personal protective equipment is used
or necessary due to unmitigated physical or chemical
hazards.
3. Document each process and job task and the associated
hazards
Rev. 1 Hard Copy Is Uncontrolled
Date March 22,2006 5 of 18
hAdeptlagenda\board agenda reports\2006 board agenda&agenda reports\0306vtem 14(b).safety&
health policies-att 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
4. .Assess the identified hazards that may require PPE for a
process and/or job task.
5. Mandate appropriate personal protective equipment as
controls a process and/or job task.
& Communicate PPE requirements to affected departments
and personnel.
7. Initiate the appropriate paperwork so the Purchasing-
Warehouse Division may order and stock non-stock PPE
in the warehouse.
a. Substitution of PPE is NOT allowed without the
written permission of the Safety and Health
Division Supervisor.
3.3 Management and Supervision
1. Review each process with a representative from the
Safety and Health Division to identify the hazards of each
process and/or job task.
2. Notify the Safety and Health Division of new or changed
operations and/or chemicals.
3. Ensure annual budgets provide for the purchase of
required personal protective equipment.
4. Ensure employees wear personal protective equipment
as specified by posted signage or the requirements of
SAFETY-SP-102
3.4 Purchasing and Warehouse
3.4.1 Purchasing
1. Procure personal protective equipment specified by the
Safety and Health Division.
2. Notify the Safety and Health Division if specified
equipment is no longer available prior to re-ordering stock
equipment.
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 6 of 18
h:\dept\agenda\board agenda reports2006 board agenda &agenda reports\0306\item 14(b).safety&
health policies-att 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
3. Notify the Safety and Health Division of personnel
protective equipment being procured by other Divisions
3A2 Warehouse
1. Stock and distribute personal protective equipment
specked by the Safety and Health Division.
2. Notify the Safety and Health Division if specked
equipment is no longer available prior to re-ordering stock
equipment.
3. Notify the Safety and Health Division of personnel
protective equipment being requested to be stocked by
other Divisions
3.15 Employees
1. Employees shall comply with the requirements of this
personal protective equipment policy and related
documents.
2. Employees shall conduct inspections of their personal
protective equipment before and after use to check for
unsafe conditions.
3. Employees shall not use damaged or modified personal
protective equipment.
4. Employees escorting contractors, vendors or visitors shall
ensure that the proper personal protective equipment is
used at all times and all safe work practices are observed
3.6 Contractors and Visitors
1. Contractors and visitors shall wear head Protection and
safety glasses at all times while in plant process areas.
2. Contractors and visitors shall wear hard hat, safety
glasses, closed toe shoes, long pants and tops/shirts with
sleeves while on construction sites.
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 7 of 18
h:\dept\agenda\board agenda reports\2006 board agenda&agenda reports03061item 14(b).safety&
health policiesatt 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
4. Personal Protective Equipment Usage
Personal protective equipment shall be purchased and used in
accordance with the requirements of this section.
4.1 Safety Glasses
1. This section applies to all District employees, contractors,
and visitors.
2. Safety glasses with side shields shall be worn at all times in
the areas designated below and where posted.
a.Safety goggles meeting the impact requirements of
ANSI Z 87.1 may be worn in lieu of safety glasses
with side shields.
b.Safety glasses with side shields shall be worn at all
times while on construction sites.
3. Safety glasses with side shields shall be worn at all times in
the following circumstances:
a. A district employee is a visitor to a site that requires
the wearing of safety glasses.
b. While performing any work that has the potential to
pose a foreseeable hazard to the eye.
c. Visitors shall wear safety glasses at all times while in
plant process areas or as designated above.
4. As required when included in a job/site specific safety plan.
4.2 Eye and Face Protection
Safety goggles and face shields provide greater protection
against liquid splashed or flying debris than safety glasses
alone. Safety goggles must meet the ANSI Z 87.1 standard for
impact. Face shields shall always be worn in conjunction with
safety glasses or goggles.
Safety goggles shall be worn
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2005 8 of 18
h:\dept\agenciMboard agenda reports\2006 board agenda &agenda reports\0306\item 14(b).safety&
health policies-att 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
1. In all areas posted as 'Safety Goggles and/or Face
Shields Required".
2. Chemical Bulk storage and distribution areas.
3. Areas where liquid splashes are likely when working with
hazardous materials, waste water or sludge.
4_ Maintenance on solids handling equipment.
5. Maintenance on methane gas, air, and water lines.
6. Maintenance on charged steam lines.
7. Grinding or chipping activities.
8. Consolidation of hazardous waste.
9. When working around cryogenic liquids.
10.Wastewater sample collection.
11.Laboratory work involving chemicals or wastewater
4.3 Head Protection
Head protection shall be worn on construction sites or any area
where there is a risk of head injury due to overhead or electrical
hazards. In addition, visitors must wear head protection at all
times while in plant process areas.
1. All hard hats purchased for district employee use shall be
marked with the ANSI Z-89.1 rating and meet the class E
rating for electrical shock. Hard hats shall be worn in the
following areas:
A. Construction sites.
B. During electrical work when the hard hat is an integral
part of electrical personal protective equipment.
C. During welding operations if the hard hat is an integral
part of the welding hood.
D. Area within a 10 foot radius where work is being
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 9 of 18
h:\dept\agenda\board agenda reports\2006 board agenda 8 agenda reportsk0306\Jtern 14(b).safety 8
health policies-att 2.doc
Personal Protective Equipment Policy sAFETy-POL-102
preformed on an elevated work platforms such as aerial
lifts, scissor lifts and catwalks.
E. Area within a 25 foot radius of a non construction work
crane operation.
2. Hard hats or bump caps maybe worn in the following areas:
A. Confined space entry when designated in the job
hazard analysis (JHA).
B. Plant Tunnels and pump rooms
4.4 Gloves
Gloves shall be worn when employees are exposed to the
following hazards:
1. Working with chemicals.
2. Working with materials that may pose a hazard due to
sharp edges, burrs, or other factors that may cut the
hand.
3. Working with sludge or raw sewage.
4. Working with biosolids when they can come into Contact
with the hand
5. .Performing work that may Cause the hand to come into
contact with blood or other potentially infectious materials
4.5 Uniforms
Uniforms shall be worn in accordance with the requirements
outlined in speck Memorandums of Understanding (MOU) and
shall meet the requirements of section 5.4 of this document.
4.6 Footwear
1. Footwear shall be worn by employees as designated in
SAFETY-SP-102.
2. Footwear, when required, shall meet the requirements of
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 10 of 18
h:Wept\agenda\board agenda reportM2006 board agenda &agenda reports\03061item 14(b).safety&
health policies-att 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
ANSI Z 41 American National Standard for Personal
Protection, Protective Footwear.
3. Employees in shops, plant process areas, construction
sites, laboratories shall wear footwear that:
a. Completely enclose the foot.
b. Have slip resistant soles
c. Have a heel less than 1 inch in height.
4.7 Electrical Safety Equipment
1. Employees who may be exposed to electrical hazards on
a routine basis shall be wear the following:
a. Flame retardant long-sleeve shirt (minimum arc
rating of 4) or coveralls (minimum arc rating of 4)
worn over untreated cotton T-shirt (or an untreated
natural fiber long-sleeve shirt).
b. Untreated natural fiber pants.
2. Employees who may be exposed to electrical switching
hazards shall wear the following:
a. Multilayer flame retardant flash jacket and flame
retardant bib overalls worn over either flame
retardant coveralls (minimum arc rating of 4) or;
b. Flame retardant long-sleeve shirt and flame
retardant pants (minimum arc rating of 4), worn
over untreated natural fiber long-sleeve shirt and
pants, worn over an untreated cotton T-shirt; or
c. Insulated flame retardant coveralls (with a
minimum arc rating of 25, independent of other
layers) worn over untreated natural fiber long-
sleeve shirt with untreated denim cotton blue jeans
('regular weight," minimum 12 oz/yd2 fabric
weight), worn over an untreated cotton T-shirt.
3. Additional personal protective equipment shall be worn in
accordance based on the job hazard analysis and shall
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 11 of 18
h:\dept\agenda\board agenda reports\2006 board agenda&agenda reports\0306Vtem 14(b).safety&
health policies-att 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
include arc-rated face shields or flash suit hoods, flame
retardant hardhat liners, safety glasses or safety goggles,
hard hat, hearing protection, leather gloves, voltage-rated
gloves, and voltage-rated tools.
4.8 Respiratory Protection
Respiratory equipment shall be issued in accordance with the
provisions of SAFETY-POL-109, Respiratory Protection
Program.
Cal-OSHA prohibits facial hair in places on the face and neck
where it can interfere with the seal of a respirator on the face of
the user. Therefore, employee's whose job classifications
require the use of respiratory protective equipment shall be
prohibited from wearing of facial hair from all areas of the face
and body, which may interfere with the seal of respiratory
protective equipment.
Employees, who may be required to infrequently wear
respiratory protective equipment and have the ability to shave
prior to respiratory protection use, may have facial hair as long
as it is removed prior to being fit tested or having to wear a
respirator.
4.9 Hearing Protection
Hearing protection shall be used in all areas designated "High
Noise Areas".
4.10 Other Personal Protective Equipment
Other personal protective equipment used by OCSD employees
shall be used in accordance with applicable OCSD policies, Cal-
OSHA, US Coast Guard or other applicable state and federal
laws, and site specific requirements.
5. Personal Protective Equipment Requirements
Personal Protective equipment purchased for use by OCSO
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 12 of 18
hAdepAagenda\board agenda reports\2006 board agenda &agenda reports\0306\item 14(b).safety&
health policies-att 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
employees shall meet the requirements established below, or in
accordance with applicable Cal-OSHA, US Coast Guard or other
applicable state and federal law.
6.1 Eye and Face Protection
Safety glasses, goggles and welding lenses shall meet the
requirements of ANSI Z 87.1. Practice for Occupational and
Educational Eye and Face Protection.
5.2 Head Protection
1. Hardhats shall meet the requirements of ANSI Z 89.1,
American National Standard for Head Protection, Type I
or II, Class E.
2. Bump caps shall meet the requirements of ANSI Z 89.1,
American National Standard for Head Protection, Class I,
Type C.
5.3 Uniforms and Apparel
Uniforms for each employee who is exposed to the hazards of
flames or electric arcs shall not increase the extent of injury that
would be sustained by the employee.
Uniforms for these work tasks shall not be made from the
following types of fabrics, either alone or in blends, unless it can
demonstrated that the fabric has been treated with flame
retardant:
1. Acetate
2. Nylon
3. Polyester
4. Rayon
6.4 Footwear
Footwear shall meet the requirements of ANSI Z 41 American
Rev. 1 Hard Copy Is Uncontrolled
Date March 22,2006 13 of 18
h:Wept\agenda\board agenda reports\2006 board agenda 8 agenda reports\0306Vtem 14(b).safety 8
health policies-aft 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
National Standard for Personal Protection, Protective Footwear.
6.6 Electrical Safety Equipment
Equipment used for electrical protection shall meet the
following requirements:
1. American Society for Testing and Materials (ASTM).
a. ASTM D 120-02, Standard Specification for Rubber
Insulating Gloves, 2002. ASTM D 1048, Standard
Specification for Rubber Insulating Blankets, 1999.
b. ASTM D 1049, Standard Specification for Rubber
Covers, 1998.
c. ASTM D 1051-02, Standard Specification for Rubber
Insulating Sleeves, 2002.
d. ASTM F 696-02, Standard Specification for Leather
Protectors for Rubber Insulating Gloves and Mittens,
2002. ASTM F 712, Standard Test Methods for
Electrically Insulating Plastic Guard Equipment for
Protection of Workers, 1995.
e. ASTM F 1117-98, Standard Specification for
Dielectric Overshoe Footwear, 1998.
f. ASTM F 1506-02, Standard Performance
Specification for Textile Material for Wearing Apparel
for Use by Electrical Workers Exposed to Momentary
Electric Arc and Related Thermal Hazards, 2002a.
g. ASTM F 1891-02, Standard Specification for Arc and
Flame Resistant Rainwear, 2002a.
h. ASTM F 1959, Standard Test Method for
Determining the Arc Thermal Performance Value of
Materials for Clothing, 1999.
i. ASTM F 2178-02, Standard Test Method for
Determining the Arc Rating of Face Protective
Products, 2002.
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 14 of 18
h:ldept\agenda\board agenda reports\2006 board agenda & agenda reports\0306Vtem 14(b).safety 8
health policies-aft 2.doc
Personal Protective Equipment Policy SAFETY-POL402
5.6 Respiratory Protection
Respiratory protection shall meet the requirements of ANSI Z
88.2, for Respiratory Protection.
5.7 Hearing Protection
Hearing protection shall have a minimum noise reduction rating
of 25 decibels.
5.8 High Visibility Clothing
Other personal protective equipment purchased for use by
OCSD employees shall meet the requirements established in
accordance with applicable Cal-OSHA, US Coast Guard or other
applicable state and federal law.
6.9 Other Personal Protective Equipment
Other personal protective equipment purchased for use by
OCSD employees shall meet the requirements established in
accordance with applicable Cal-OSHA, US Coast Guard or other
applicable state and federal law
6. Training Program
This section outlines the requirements the district has
established to provide effective training to employees who are
required to use personal protective equipment.
6.1 Personal Protective Equipment Training Program
1. The Safety and Health Division shall establish a Personal
Protective Equipment Training Program.
2. Training shall be provided prior to requiring the employee to
use personal protective equipment in the workplace.
3. Retraining shall be administered annually, and when the
following situation(s) occur.
Rev. 1 Hard Copy Is Uncontrolled
Date March 22,2006 15 of 18
h:\dept\agenda\board agenda repons\2006 board agenda&agenda reports\030611tem 14(b).safety&
health policies-aft 2.doc
Personal Protective Equipment Polley SAFETY-Pot..m
A. Changes in the workplace or the type of personal
protective equipment render previous training obsolete.
B. If the employee cannot demonstrate knowledge of or
use the personal protective equipment.
C. Any other situation arises in which retraining appears
necessary to ensure safe personal protective equipment
use.
6.2 Program Administration and Review
The district has designated a program administrator who is
qualified by appropriate training and experience to administer
and oversee the personal protective equipment program and
conduct the required evaluations of program effectiveness.
6.2.1 Program Administration and Review Process
This Personal Protective Equipment Program shall be evaluated
annually to ensure that it is effective. The following steps shall
be followed to conduct this program review:
1. The Safety and Health Division shall determine if regulations
or national consensus standards have changed since the last
annual program review.
A. Review Federal OSHA Standards, interpretations and
documents.
B. Review consensus standards.
2. The Safety and Health Division shall convene a Safety Sub
Committee to review the current Personal Protective
Equipment Program, proposed changes to State and Federal
Regulations and national consensus standards and
recommend changes to the District's Personal Protective
Equipment Program as required.
3. The Safety and Health Division shall have 30 days to make
minor program changes, and 60 days in the case of major
program re-writes.
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 16 of 18
h:\dept\agenda\board agenda reports\2006 board agenda & agenda reports\0306Utenn 14(b).safety&
health policies-att 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
4. Personal Protective Equipment Program reviews shall start
by February 15 of each year
7. References
Title 8, California Code of Regulations, Subchapter 7, General
Industry Safety Orders, Group 2, Safe Practices and Personal
Protection, Article 10 Personal Safety Devices and Safeguards
Title 8, California Code of Regulations Section 5144, Respiratory
Protection.
ANSI Z 41 American National Standard for Personal Protection,
Protective Footwear
ANSI Z 87.1. Practice for Occupational and Educational Eye and
Face Protection
ANSI Z 88.2, for Respiratory Protection.
ANSI Z 89.1, American National Standard for Head Protection
ANSUISEA 107-1999, American National Standard for High-
Visibility Apparel.
ASTM D 120-02, Standard Specification for Rubber Insulating
Gloves, 2002.
ASTM D 1048, Standard Specification for Rubber Insulating
Blankets, 1999.
ASTM D 1049, Standard Specification for Rubber Covers, 1998.
ASTM D 1051-02, Standard Specification for Rubber Insulating
Sleeves, 2002.
ASTM F 696-02, Standard Specification for Leather Protectors
for Rubber Insulating Gloves and Mittens, 2002.
ASTM F 712, Standard Test Methods for Electrically Insulating
Plastic Guard Equipment for Protection of Workers, 1995.
ASTM F 1117-98, Standard Specification for Dielectric Overshoe
Footwear, 1998.
ASTM F 1506-02, Standard Performance Specification for
Textile Material for Wearing Apparel for Use by Electrical
Workers Exposed to Momentary Electric Arc and Related
Thermal Hazards, 2002a.
Rev. 1 Hard Copy Is Uncontrolled
Date March 22,2006 17 of 18
h:\dept\agenda\board agenda reports\2006 board agenda& agenda reports\03061itenn 14(b).safety&
health policies-aft 2.doc
Personal Protective Equipment Policy SAFETY-POL-102
ASTM F 1891-02, Standard Specification forAm and Flame
Resistant Rainwear, 2002a.
ASTM F 1959, Standard Test Method for Determining the Arc
Thermal Performance Value of Materials for Clothing, 1999.
ASTM F 2178-02, Standard Test Method for Determining the Arc
Rating of Face Protective Products, 2002.
Memorandum of Understanding Between the Orange County
Sanitation District and the International Union of Operating
Engineers Local 501 for the Operations and Maintenance Unit
Memorandum of Understanding Between the Orange County
Sanitation District and the Employees in the Supervisor Group
Memorandum of Understanding Between the Orange County
Sanitation District and the Employees in the Professional Group
SAFETY-POL-101, Injury and Illness Prevention Program
SAFETY-POL-106, Hearing Conservation Program
SAFETY-POL-109, Respiratory Protection Program
SAFETY-SP-102.1 Personal Protective Equipment Program
8. Attachments
None
Rev. 1 Hard Copy Is Uncontrolled
Date March 22, 2006 18 of 18
hAdepbagenda\board agenda repons12006 board agenda&agenda repodsW OMitem 14(b).safety&
health policies-aft 2.doc
ORANGE COUNTY SANITATION DISTRICT
Safety and Health Division
SAFETY-POL-107
Hazard Communication Program
APPROVALS
Approved by: Date:
Director of Human Resources
Approved by: Date:
Human Resources Manager
Approved by: Date:
Safety and Health Supervisor
PROCEDURE REVISION HISTORY
Rev. Date Approval
0 04/28104
1 01/10106
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and Health
public folder to ensure that they have the latest version.
Hazard Communication Program SAFETY-POL407
Contents
1. Purpose ...............................................................................................3
2. Definitions...........................................................................................3
3. Requirements......................................................................................4
3.1 Hazardous Materials Procurements.........................................................5
3.2 Container Labels......................................................................................5
3.3 Material Safety Data Sheets (MSDS).......................................................5
4. Responsibilities..................................................................................5
4.1 Safety and Health Division.......................................................................5
4.2 Employee Development Division..............................................................6
4.3 Environmental Service Laboratories................................................6
4.4 Purchasing...............................................................................................6
4.5 Warehouse...............................................................................................7
4.6 Hazardous Materials Using Divisions.......................................................7
4.7 Contractors, Consultants, Visitors and Volunteers...................................8
5. Program Administration and Review ................................................8
6. References ..........................................................................................8
7. Attachments........................................................................................8
Rev. 1 Hard Copy Is Uncontrolled
Date: January 10, 2006 2 of 8
hMept\agendalboard agenda reports12006 board agenda&agenda reports103061item 14(b).safety&
health policies-aft 3.doc
Number: SAFETY-POL-107
Orange County Sanitation District Revision Number: 1
Hazard Communication Program Date: January 10,2006
Approved by: James Matte/Gary
Pons
1 . Purpose
The purpose of the Hazard Communication Program is to
establish a program to educate employees of the hazards of
chemicals used at the District and inform employees of the
methods available to control these hazards.
This policy applies to all District employees, volunteers and
visitors.
2. Definitions
Container Any bag, barrel, bottle, box, can, cylinder, drum, reaction vessel,
storage tank, tank truck, or the like that contains a hazardous
substance. For purposes of this section, pipes or piping systems
are not considered to be containers.
Designated Any individual or organization to whom an employee gives
representative written authorization to exercise such employee's rights under
this section. A recognized or certified collective bargaining agent
shall be treated automatically as a designated representative
without regard to written employee authorization.
Hazardous Any material which is a physical hazard or a health hazard or is
Material included in the List of Hazardous Substances prepared by the
California Department of Industrial Relations
Any substance which is a physical or a health hazard or is
Hazardous included in the List of Hazardous Substances prepared by the
Substance California Department of Industrial Relations.
Hazard warning Any words, pictures, symbols, or combination thereof, appearing
on a label or other appropriate form of warning which convey the
health hazards and physical hazards of the substance(s) in the
Rev. 0 Hard Copy Is Uncontrolled
Date 04128/04 3 of 8
h:ldeptlagendalboard agenda reports12006 board agenda&agenda reports\030Rtem 14(b).safety&
health policies-att 3.doc
Hazard Communication Program SAFETY-POL407
container(s).
Health hazard A substance which is statistically significant evidence based on
at least one study conducted in accordance with established
scientific principles that acute or chronic health effects may
occur in exposed employees. The term "health hazard" includes
substances which are carcinogens, toxic or highly toxic agents,
reproductive toxins, irritants, corrosives, sensitizers,
hepatotoxins, nephrotoxins, neurotoxins, agents which act on
the hematopoietic system, and agents which damage the lungs,
skin, eyes, or mucous membranes.
Label Any written, printed, or graphic material displayed on or affixed
to containers of hazardous substances.
Material Safety Data Written or printed material concerning a hazardous substance
Sheet(MSDS) which is prepared in accordance to the California Code of
Regulations, Title 8, Section 5194 (g).
Physical hazard A substance which is a combustible liquid, a compressed gas,
explosive, flammable, an organic peroxide, an oxidizer,
pyrophoric, unstable (reactive) or water-reactive material.
Trade secret Any confidential formula, pattern, process, device, information, or
compilation of information which gives its user an opportunity to obtain
a business advantage over competitors who do not know or use it. A
trade secret shall not include chemical identity information which is
readily discoverable through qualitative analysis.
3. Requirements
This policy is based on a simple concept - that employees have
both a need and a right to know the hazards and the identities of
the chemicals they are exposed to in the workplace. Employees
also need to know what protective measures are available to
prevent adverse effects from occurring and where to obtain this
information. By making job-specific hazard information
available to employers and employees, and implementing
recommended precautions for safe use, the result will be a
reduction in illnesses and injuries caused by chemical exposure.
Together, the District's and each employee's actions will prevent
the occurrence of adverse health effects from the use of
chemicals in the workplace.
Rev. 1 Hard Copy Is Uncontrolled
Date: January 10, 2006 4 of 8
h:\dept\agenda\board agenda reports\2006 board agenda &agenda reports\0306\item 14(b).safety&
health policies-att 3.doc
Hazard Communieagon Program SAFETY-POL-707
3.1 Hazardous Materials Procurements
It is the policy of the District to reduce the use of hazardous
materials/substances whenever feasible. Therefore, any
hazardous material/substance being considered for use at any
District facility shall be evaluated to ensure it is appropriate and
the safest feasible alternative.
All procurement of hazardous materials/substances shall be
performed in accordance with the provisions of the District's
written Hazard Communication Program (HCP: SAFETY-SP-
107.1).
3.2 Container Labels
All containers of hazardous materials/substanoes shall be
labeled and comply with the provisions of 8CCR 5194, Hazard
Communication, subpart (f) and the District's HCP.
3.3 Material Safety Data Sheets (MSDS)
Every hazardous material/substance used or stored by or for the
District must have a current and corresponding material safety
data sheet (MSDS).
Each MSDS shall contain the information required in 8 CCR,
section 5194, Hazard Communication, subpart g, Material Safety
Data Sheets.
The District shall manage all MSDS in accordance with the
provisions of the HCP.
4. Responsibilities
4.1 Safety and Health Division
The Safety and Health Division shall be responsible for the
following:
Rev. 1 Hard Copy Is Uncontrolled
Date:January 10, 2006 5 of 8
h:tdeptlagenda\board agenda reports\2006 board agenda &agenda reports\0306\item 14(b).safety&
health policies-att 3.doc
Hazard Communication Program SAFETY-POL-107
• Develop a written Hazard Communication Program that will
comply with the requirements of 8 CCR, Section 5194,
Hazard Communication, and best industry practice.
• Evaluate all MSDS for hazardous materials/substances prior
to purchase.
• Evaluate all MSDS related to contract work in accordance
with the provisions of the District's HCP.
• Manage the District's electronic MSDS database.
• Oversee the activities of the District's Chemical Safety
Subcommittee.
• Provide training in accordance to the provisions of the
District's HCP.
• Maintain all incident reports submitted in relation to
provisions of the HCP.
• Procure contractor services, on an as needed basis, in
accordance with District requirements.
• Conduct program administration/review in accordance with
the provisions of the District's HCP.
4.2 Employee Development Division
The Employee Development Division shall be responsible for the
following:
• Maintain the District's Training Records Management System
database.
4.3 Environmental Science Laboratories
The Environmental Science Laboratories shall be responsible for
the following:
• Complying with the provisions of the District's Laboratory
Safety and Chemical Hygiene Program
Rev. 1 Hard Copy Is Uncontrolled
Date: January 10, 2006 6 of 8
h.\dept\agenda\board agenda reports\2006 board agenda &agenda reports\0306Utem 14(b).safety&
health policies-att 3.doc
Hazard Communication Program SAFETY-POL-107
• Manage chemical mixtures in accordance with the provisions
of the District's HCP.
4.4 Purchasing
The Purchasing Division shall be responsible for:
• Selecting vendors and establishing contracts or purchase
orders to procure hazardous materials/substances.
• Procuring only those hazardous materials/substances for
which an approved MSDS is on file with the Safety and
Health Division Office.
4.5 Warehouse
The Warehouse shall be responsible for:
• Ensuring all packages of hazardous materials/substances
are labeled at the time of delivery form the vendor.
• Not accepting packages of hazardous materials/substances
that are damaged, leaking or unlabeled or have damaged
labels.
4.6 Hazardous Materials Using Divisions
Divisions responsible for using hazardous materials/substances
shall be responsible for:
• Ensuring an approved MSDS is in the MSDS database prior
to submitting a procurement request or procuring the
material.
• Ensuring appropriate personal protective equipment, as
recommended by the MSDS, is available for use by
employees.
• Ensuring employees have access to MSDS during working
hours.
Rev. 1 Hard Copy Is Uncontrolled
Date: January 10, 2006 7 of 8
h:\deptWgenda\board agenda reports\2006 board agenda 8 agenda reports\0306\item 14(b).safety&
health policies-att 3.doc
Hazard Communication Program SAFETY-POL-107
• Ensuring employees receive training on the hazards of
hazardous materials they work with or may be exposed to.
• Conducting inspections of hazardous materials storage areas
for leaking or damaged containers.
• Ensuring hazardous materials storage areas, for projects
they are coordinating and/or overseeing, meet all applicable
regulatory and District requirements.
4.7 Contractors, Consultants, Visitors and Volunteers
Contractors, consultants, visitors and volunteers shall not bring
hazardous materials onto any District facility unless an MSDS
has been provided to the Safety and Health Division Office.
Additionally, they shall comply with the provisions of the District's
HCP.
5. Program Administration and Review
The Hazard.°Communication Proera'i =shall be=rrtanaaed'.and
administered by fhe 'Safetd land,Health .Division. e T1is Hazard
Communication Program shalhhe e4aluated'annuallvlto ensure
that r it is,effdctive. rProeram„reviews=shall'minimalN occur in
November of each calendar year.
6. References
Title 8, California Code of Regulations, Section 5194, Hazard
Communication
SAFETY-POL-101 Injury and Illness Prevention Program
SAFETY-SP-107.1 Hazard Communication Program
7. Attachments
None
Rev. 1 Hard Copy Is Uncontrolled
Date: January 10, 2006 8 of 8
h:ldeptlagenda\board agenda reports\2006 board agenda&agenda reportst0306Utem 14(b).safety&
health policies-aft 3.doc
ORANGE COUNTY SANITATION DISTRICT
Safety and Health Division
SAFETY-POL-202
Accident Investigation and Reporting
APPROVALS
Approved by: ou Date:
Director of Human Resrces
Approved by: Date:
Manager,Human Resources
Approved by: Date:
Safety Supervisor
PROCEDURE REVISION HISTORY
Rev. Date Approval
0 9I25IO2
1 10126/2005
2 61ro4/06 seum
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and Health
public folder to ensure that they have the latest version.
Accldent Investigation and Reporting SAFETY-POL-202
Contents
1. Purpose...............................................................................................3
2. Definitions...........................................................................................3
3. Requirements and Responsibilities ..................................................4
3.1 General Requirements.............................................................................4
3.1.1 Safety and Health Division Responsibilities ........................................6
3.1.2 Manager and Supervisor Responsibilities...........................................7
3.1.3 Employee Responsibilities ..................................................................7
3.2 Accidents In Which Personnel Are Injured or Equipment is Damaged.....8
3.2.1 Off Site Accidents................................................................................9
3.2.2 On Site..............................................................................................11
3.3 Near Miss Accidents...............................................................................12
3.4 Safety-Health Investigation Team..........................................................13
3.5 Employee Training .................................................................................14
3.6 Program Administration..........................................................................14
4. References ........................................................................................14
5. Attachments......................................................................................14
Rev. 2 Hard Cgty Is Uncontrolled
Date: March 22, 2006 2 of 15
Number: SAFETY-POL-202
Orange County Sanitation District
Revision Number: 2
Accident Investigation and Reporting Date: March 22, 2006
Approved by: Lisa Tomko
1 . Purpose
The purpose of this policy is to outline the process to report
incidents and accidents and to ensure investigations of these
incidents and accidents are properly conducted. This policy
applies to all Cal-OSHA recordable injuries, all incidents
involving $ F,440.09. 1000!00 of property damage, all motor
vehicle accidents and all near miss accidents that may have
resulted in any of the above. Other incidents or accidents may
be investigated at the discretion of the supervisor or the Safety
and Health Division. This policy includes all district employee,
contractor and visitor accidents and incidents
2. Definitions
Accident An unplanned, undesired event, not necessarily resulting in
injury, but damaging to property and/or interrupting the activity in
process, maintenance or construction.
Contractor A company performing work for the district under a contract.
This includes subcontractors.
First aid Is any one-time treatment, and any follow-up visit for the
purpose of observation of minor scratches, cuts, bums, splinters,
and so forth, which do not ordinarily require medical care. Such
one-time treatment, and follow-up visit for the purpose of
observation, is considered first aid even though provided by a
physician or registered professional personnel.
Incident An incident has occurred if any one of the following conditions
are met; a near miss, an injuryfillness to a person during the
course of employment on OCSD property of from use of OCSD
equipment, OCSD property damaged resulting in replacement or
repairs of the equipment in excess of $1,000.00, contractor
injuryfillness resulting from contract work, or contractor property
damage in excess of $ 1,000.00 An undesired -may
Gause PBFGGRal harm or other damage.
Rev. 1 Hard Copy Is Uncontrolled
Date. April 27, 2005 3 of 15
Accident Invesdgatlon and Reporting SAFETY-110Ld02
Lost workdays The number of days (consecutive or not) after, but not including,
the day of injury or illness during which the employee would
have worked but could not do so; that is, could not perform all or
any part of his normal assignment during all or any part of the
workday or shift, because of the occupational injury or illness.
Manager Employee who :
• manages, plans, supervises and coordinates the operations
and activities of one or more major District divisions and
works under general direction or administrative direction of a
Department Director or the General Manager, exercising
discretion in applying general goals and policy statements
and in resolving organizational and service delivery problems
and;
• Organizes and directs the work of subordinate staff, and;
• Assumes significant responsibility for a variety of personnel
activities in such areas as selection, training and disciplinary
actions and;
• Assumes significant responsibility for the preparation and
administration of assigned budget(s)
Near Miss Any potentially hazardous situation that has not resulted in a
personal injury or property damage and/or an observed breaking
of a District policy, procedure or regulatory requirement as they
relate to safety and health.
Recordable Injury Any occupational injuries or illnesses which result in fatalities,
regardless of the time between the injury and death, or the
length of the illness; or lost workday cases, other than fatalities,
that result in lost workdays; or nonfatal cases without lost
workdays which result in transfer to another job or termination of
employment, or require medical treatment (other than first aid) or
involve loss of consciousness or restriction of work or motion.
This category also includes any diagnosed occupational
illnesses which are reported to the employer but are not
classified as fatalities or lost workday cases.
Reportable Injury Any serious injury or illness, or death, of an employee occurring
in a place of employment or in connection with any employment.
Serious Injury or Means any injury or illness occurring in a place of employment
Illness or in connection with any employment which requires inpatient
hospitalization for a period in excess of 24 hours for other than
medical observation or in which an employee suffers a loss of
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 4 of 15
Accident Investigation and Reporting SAFETY-FOL-202
any member of the body or suffers any serious degree of
permanent disfigurement.
Supervisor Employee who-
-Supervises, assigns and reviews the work of subordinates in
assigned sections or work units, and;
-Works under direction or general direction of higher level
supervisory or management staff, exercising discretion in
selecting appropriate resources to use in accomplishing
assigned work, and;
-Assumes responsibility for recommending a variety of
personnel actions in such areas as performance evaluation,
training, selection and disciplinary measures, and;
-Ensures that appropriate policies and procedures are
followed by subordinates, and;
-Monitors, coordinates and assists in developing the budget
for assigned area
Vehicle Is a device by which any person or property may be propelled,
moved, or drawn upon a highway, including devices moved
exclusively by human power or used exclusively upon stationary
rails or tracks. This includes electric carts and bicycles.
3. Requirements and Responsibilities
3.1 General Requirements
1. Accidentlincident investigations shall be fact-finding. Root
cause determination is the primary goal.
2. The Safety and Health Division shall be immediately notified
by the responsible manager/supervisor of all
accidents/incidents that :
A. Require an outside agency to respond to a medical aid
situation.
B. Involve a vehicle and an injury while the driver is on
Rev. 2 Hard Copy Is Uncontrolled
Date. March 22, 2006 5 of 15
Accident Investigation and Reporting SAFETY-POL-202
district business.
C. Involve a vehicle that is on district property.
D. Involve more than $2 W 1000.00 in property damage.
E. Is a Cal-OSHA reportable or recordable injury
(1) Including contractors hired by OCSD.
F. Involve a response of the district's emergency medical
unit.
G. Require any report to be made to any regulatory
authority.
3. Completion of .'theed Accidentlincident Investigation
repeksform involving district staff shall be returned to the
Safety and Health Division Office no later than three (3)
days following the accidentfincident by the
supervisor/manager of the person(s) injured.
4. Completed accident/incident investigation reports for
accidents involving contractor personnel or visitors shall be
submitted to the Safety and Health Division office with in five
(5) business days of the accidenVincident by the division
responsible for managing the contractor or visitor.
A. If the incident, in the opinion of the Safety and Health
Division, had the potential to lead to an imminent
danger situation, the Safety and Health Division may
stop all work on a jobslte until an, Incident,.report has
been received.
1 Work .shall be sto( ) Pped ih alxonfanpe with tfie
requirements of "safety stand downs" as specified
in SAFETY-POL-101 Injury;- Illness_ Prevention
Programs.
3.1.1 Safety and Health Division Responsibilities
1. The Safety and Health Division shall be responsible for
developing and implementing the Accident/Incident
Investigation and Reporting Program.
2. The Safety and Health Division shall be responsible for
maintaining accident reports and OSHA recordkeeping
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 6 of 15
Accident Investigation and Reporting SAFETY-POL-202
activities.
3. The Safety and Health Division shall be responsible for
coordinating the activities for supplemental accident/incident
investigations as outlined in section 3.1.
4. The Safety and Health Division shall be responsible for
notifying Cal-OSHA of all reportable accidents.
5. The Safety and Health Division shall be responsible for
conducting training for employees on proper accident
investigation techniques.
3.1.2 Manager and Supervisor Responsibilities
1. Managers and supervisors shall be responsible for
conducting accidentlincident investigations in accordance
with established procedures.
2. Managers and supervisors shall be responsible for ensuring
all accident and incident reports are completed and returned
to the Safety and Health Division within 3 days of the
accident. (Five days for contractor or visitor
accidents/incidents)
3. Managers and/or supervisors shall be responsible for
ensuring all recommended corrective actions are addressed
and completed.
3.1.3 Employee Responsibilities
1. Employees shall report all accidents and incidents to their
manager/supervisor on the same shift the accident or
incident occurred.
A. The manager/supervisor shall document the accident or
incident and forward the report to the Safety and Health
Division.
2. Employees shall report all near miss accidentsfincidents to
either their manager/supervisor or the Safety and Health
Division on the same shift the accident or incident occurred.
3. Employees shall fully cooperate with managers, supervisors
and Safety and Health personnel who are conducting the
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 7 of 15
Accident Imestigation and Reporting SAFETY-POL-202
accident/incident investigation.
A. Employees may have bargaining unit representation
present during accident investigations.
4. Employees shall promptly complete and return all
paperwork regarding the incidentlaccident as required.
3.2 Accidents in Which Personnel Are Injured or Equipment is
Damaged
1. If the accident is serious and the employee is unable to
leave the scene of the accident, help shall be summoned,
using the extension 222 emergency number.
A. The Control Center shall notify:
(1) The Medical Unit Team if the accident/incident is at
Plant 1 or Plant 2.
(2) Outside Medical services as required (911).
(3) Safety and Health Division personnel.
(4) The appropriate management personnel.
B. Notification shall be by
(1) Land telephone.
(2) Cellular telephone (including Nextel).
(3) Mobile radio.
2. The Control Center shall dispatch personnel to meet outside
medical services at the front gate as necessary and escort
them to the accident site.
3. The employee or another employee shall notify their
supervisor of an accident.
4. After the injured person is tended to, an accident/incident
investigation shall be started by the supervisor as soon as
possible.
A. The supervisor shall complete the Accident Report
form.
Rev. 2 Hard Copy Is Uncontrolled
Date. March 22, 2006 8 of 15
Accident Investigation and Reporting SAFETY-POL-202
5. The accident investigation shall be conducted in accordance
with SAFETY-SOP-202.1, Accidents In Which Personnel
Are Injured.
6. The supervisor/manager may contact the Safety and Health
Division for assistance with the accident investigation.
7. The accident scene shall be preserved until the accident
investigation has been completed.
3.2.1 Off Site Accidents
Employees and 1. If safe, stop immediately and determine possible damage.
Passengers Avoid obstructing traffic if possible. The vehicle shall be
moved to a safe location as soon as possible.
2. Aid the injured and see to it that they receive medical
attention as soon as possible by local EMS personnel
(911).
3. If the vehicle is equipped with a radio, call the Control
Center and have the Control Center call the local police. If
the vehicle does not have a radio, call the police from a
nearby telephone and call your supervisor. Request
assistance in the investigation process if necessary.
Note: A police report is needed when the accident involves
the public or non-district property. If the police do
not respond, the employee should obtain all pertinent
information available from the other driver and the
accident scene and then go to the police department
with local jurisdiction.to file a report.
4. Identify as many witnesses as possible and obtain their
name, address, and home and work phone numbers.
5. Using the camera in the vehicle acciaerl_tphoto,pack, take
pictures of each vehicle involved and the road conditions.
(See SAFETY-SOP-202.2)
6. Do not discuss the accident with anyone other than the
police and District personnel.
A. Provide only your name, agency name and address,
and work telephone number.
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22,2006 9 of 15
Accident Investigation and Reporting SAFETY-POL-262
B. Obtain a business card from the police officer and ask
them to record the accident case number on the card.
Supervisor
7. The driver, and each employee passenger, and each
employee witness should assist in completion of the
Vehicle Accident Report (unless involved parties are
incapacitated or deceased) during the shift in which the
accident occurred.
B. The Safety and Health Division must be notified of the
accident as soon as possible.
9. Conduct an accident investigation (at the accident scene if
possible) and determine actions to prevent accident
recurrence.
A. The accident investigation shall be conducted in
accordance with SAFETY-SOP-202.2, Investigating
On/Oftsite Vehicle Accidents.
Division Manager 10. Complete and sign the Vehicle Accident Report.
11. The completed and approved Vehicle Accident Report
must be delivered to the Safety and Health Division and the
appropriate Division Manager before the end of the shift. If
the accident occurs during evening, weekend, or holiday
hours, the Vehicle Accident Report shall be distributed at
the beginning of the next week day shift.
12. Determine if participation in the investigation at the scene
of the accident is warranted. This decision is based on
personal injury and the severity of the equipmenVproperty
damage.
13. Review and approve the Vehicle Accident Report.
14. Ensure that actions to prevent accident recurrence are
Safety and Health completed and documented.
15. Send written verification of completion to the Safety and
Health Division.
16. Track completed and outstanding actions to prevent
accident recurrence and forward completed items to the
Safety and Health Division.
17. Participate in the investigation at the scene of the accident
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 10 of 15
Accident Investigation and Reporting SAFETY-POL-202
if the accident resulted in personal injury and/or significant
equipment/property damage.
16. Review the Vehicle Accident Report and determine if an
additional investigation is warranted.
19. Forward copies of the Vehicle Accident Report to the Fleet
Services Supervisor.
20. Distribute completed and outstanding actions and
recommendations to prevent accident recurrence.
3.2.2 On Site
Employee 1. Stop immediately and determine possible damage. Move
the vehicle to the side of the road if possible. Avoid
obstructing traffic if possible.
A. Call for assistance if traffic/crowd control is required.
2. Aid the injured and see to it that they receive medical
attention as soon as possible.
A. Notify the Control Center who will notify the Medical
Team via 222 reporting
3. Call the Control Center and have the Control Center Call the
Safety and Health Division.
4. Call your supervisor. Request assistance in the
investigation process if necessary.
A. The accident investigation shall be conducted in
accordance with SAFETY-SOP-202.2, Investigating
Vehicle Accidents.
5. Identify as many witnesses as possible and obtain their
name.
Supervisor 6. The driver, and each employee passenger, and each
employee witness should assist in completion of the Vehicle
Accident Report during the shift in which the accident
occurred.
7. The supervisor shall conduct an accident investigation (at
the accident scene if possible) and determine actions to
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 11 of 15
Accident Investigation and Reporting SAFETY-POE202
prevent accident recurrence.
8. The supervisor shall complete and sign the Vehicle Accident
Report.
Division Manager
9. The completed and approved Vehicle Accident Report must
be delivered to the Safety and Health Division and the
appropriate Division Manager before the end of the shift.
10. The division manager shall review and approve the Vehicle
Accident Report.
11. The division manager shall ensure that actions to prevent
accident recurrence are completed and documented.
12. The division manager shall send written verification of
completion to the Safety and Health Division.
Safety and Health 13. The division manager shall track completed and outstanding
actions to prevent accident recurrence and forward
completed items to the Safety and Health Division.
14. The Safety and Health Division shall participate in the
investigation at the scene of the accident if the accident
resulted in personal injury and/or significant
equipment/property damage.
15. The Safety and Health Division shall review the Vehicle
Accident Report and determine if an additional investigation
is warranted.
16. The Safety and Health Division shall distribute completed
and outstanding actions and recommendations to prevent
accident recurrence.
3.3 Near Miss Accidents
1. The employee shall notify their supervisor of a near miss
accident.
2. The employee and supervisor shall conduct an investigation
into the causes of the near miss accident.
A. The near miss shall be documented on the accident
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 12 of 15
Accident Investigation and Reporting SAFETY-POL-202
report form.
3. The accident investigation shall be conducted in accordance
with SAFETY-SOP-202.1.
4. The supervisor/manager may contact the Safety and Health
Division for assistance with the Near Miss Accident
Investigation.
5. The near miss scene shall be preserved until the near miss
accident investigation has been completed.
3.4 Safety-Health Investigation Team
1. The Safety and Health Division shall coordinate the
formation of a Safety-Health Investigation Team for all
accidents
2. The members of the Safety-Health Investigation Team shall
receive training in conducting an accident investigation.
A. Training shall be conducted at least biennially.
3. The Safety and Health Division shall ensure that team
members have the proper equipment to conduct a thorough
investigation.
4. The team shall conduct investigations on all
accidents/incidents that meet the following criteria:
A. Accidents resulting in injuries. (District employees,
visitors, contractors, etc.)
B. Property damage of more than $5,000.00.
C. Issues reported to any regulatory agency.
D. As requested by executive management.
E. As requested by of legal counsel.
F. To supplement investigations lacking in proper
information and/or details.
G. As requested by the Safety and Health Supervisor for
training purposes.
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 13 of 15
Accident Investigation and Reporting SAFETY-POL-202
5. The team shall be made up of a cross section of District
employees as determined by the Safety and Health
Supervisor.
6. Safety and Health Investigation Team may request
meetings with all involved parties and witnesses in order to
collect factual data of the accident.
A. As a result, Safety and Health Investigation Team may
determine corrective action as a measure to prevent
future accidents.
B. Managers/supervisors are responsible for
implementation of corrective actions recommended by
the Safety and Health Investigation Team.
C. Safety and Health Investigation Team may recommend
disciplinary action of involved parties but shall not
determine the type or magnitude of the action. This
shall remain the responsibility of the employee's
manager/supervisor.
7. Each bargaining unit shall be represented on the team.
3.5 Employee Training
1. The Safety and Health Division shall be responsible for
developing and implementing an Accident Investigation
Process Training Program.
2. All managers and supervisors shall attend the Accident
Investigation Process Training Program.
A. Non-management personnel may attend Accident
Investigation Process Training Program training with their
supervisor's permission.
3. Training shall be conducted as an initial course and as
required.
3.6 Program Administration
1. The Safety and Health Division shall be responsible for
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 14 of 15
Accident Investigation and Reporting SAFETY-POL-202
reviewing the Accident Investigation and Reporting Program
every two years.
4. References
8 California Code of Regulations, §3203. Injury and Illness
Prevention Program
8 California Code of Regulations, §330, Definitions
8 California Code of Regulations, Chapter 7, Subchapter 1.
Occupational Injury or Illness Reports and Records
8 California Code of Regulations Chapter 3.2. , Subchapter 2,
Article 3. Reporting Work-Connected Injuries, §342. Reporting
Work-Connected Fatalities and Serious Injuries.
California Vehicle Code, Division 1, Section 670
SAFETY-POL-101 Injury and Illness Prevention Program
SAFETY-POL-108 Contractor Safety Program
SAFETY-SOP-202.1, Accident Inveestigahon Persorviel *A
Property a n 1AIhieh bishilet
SAFETY-SOP-202.2, Investi " a
gating Cordractor AcclderHs __.
Assidents
SAFETY SOP 202A
5. Attachments
None
Rev. 2 Hard Copy Is Uncontrolled
Date: March 22, 2006 15 of 15
ORANGE COUNTY SANITATION DISTRICT
Safety and Health Division
SAFETY-POL-402
Workers' Compensation
APPROVALS
Approved by: Date:
Diredw of Human Resources
Approved by: Date:
Human Resources Manager
Approved by: Date:
Safety and Health SuperNsw
PROCEDURE REVISION HISTORY
Rev. Data Approval
0 10r27104 L.Tomko
1 03I22I2000
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and Health
public folder to ensure that they have the latest version.
Workers'Compensation Benefits Program sAFETY-POL-Q2
Contents
1. Purpose ...............................................................................................3
2. Definitions...........................................................................................3
3. General-Workers' Compensation ......................................................3
4. Requirements......................................................................................6
4.1 Safety and Health Division .......................................................................5
4.2 Purchasing Division..................................................................................5
4.3 Human Resources Department................................................................5
4.4 Employee Development Division..............................................................5
4.5 Employees ...............................................................................................6
4.6 Supervisors and Managers ......................................................................7
S. Program Administration and Evaluation...........................................8
6. References ..........................................................................................8
7. Attachments........................................................................................8
2 of
Number. SAFETY-POL-402
Orange County Sanitation District
Revision Number: 1
Workers' Compensation Benefits Program Date: March 22, 2006
Approved by: Lisa L.Tomko
1. Purpose
The purpose of this policy is to establish guidelines for
employees who suffer personal injury/illness arising out of or in
the course of employment with the Orange County Sanitation
District (District), thus requiring the affected employees) to
participate in the District's Workers' Compensation Program
(WCP).
2. Definitions
Employee An employee, or in the case of the employee's death, his or her
dependent, as each is defined in Division 4 of the Labor Code,
or the employee's or dependent's agent.
Self-insured An employer, either as an individual employer or as a group of
Employer employers, that has been issued a certificate of consent to self-
insure as provided by Labor Code Section 3700 (b) or (c),
including a joint powers authority or the State of California as a
legally uninsured employer.
Third Party An agent under contract to administer the workers'
Administrator compensation claims of an insurer, self-insured employer, or
joint powers authority.
Workers' The Review Board, commissioners, deputy commissioners,
Compensation presiding workers' compensation judges and workers'
Review Board compensation judges.
3. General-Workers' Compensation
1. The District shall implement a Workers' Compensation
Program (WCP), as a self-insured employer, under the
requirements of the applicable sections within California
Senate Bill 899 (2004). A Third-party Claims Administrator
(TPA) shall manage this program as applicable and under
the direction of the District.
3 of
workers' Compensation Benefits Program SAFETY41OL 402
2. Medical evaluation of WC claims shall be performed by a
Medical Network (MN) that will be established by the TPA
(January 2005). The MN shall be established and function
under the requirements of the California Labor Code,
Section 4616. Patient (employee) rights shall comply with
the requirements under California Labor Code, Section
4616.3
3. The District may authorize Sick-Industrial (SI) leave for
medical treatment directly related to an industrial
injury/illness when the TPA has accepted the claim for
benefits and authorized the treatment appointments.
4. Sick industrial leave may be authorized when the TPA has
delayed or denied a claim and the TPA has scheduled the
injured/ill employee for a medical appointment.
5. Sick industrial leave time periods in general will be utilized
for medical treatment procured using a pre-designated
physician, a referral from that pre-designated physician or
from a physician in the District's medical network. All other
physician visits shall utilize regular sick time.
6. Sick industrial leave time periods will be determined on a
case by case basis and must meet the procedures defined
below.
7. The leave is available to be used until the case is closed,
awarded or settled.
8. Sick industrial leave shall not be authorized for any
employee who has:
• Received a Findings and Award from the Workers'
Compensation Review Board;
• Engaged in a Stipulated Settlement;
• A claim which has been deemed closed by the TPA; or,
A Settlement which includes future medical expenses.
4of8
Workers'Compeneation Benefits Program SAFETY-POL-402
4. Requirements
4.1 Safety and Health Division
1. Manage the District's Workers' Compensation Program.
2. Develop a written WCP program/procedure document.
3. Review and approve all timecards with SI coding.
a.Submit timecards to the Finance —Payroll division by
the close of business on Friday.
4. Act as the District's liaison with the TPA.
5. Conduct at least an annual review of the District's WCP.
6. Recommend action to the Director of Human Resources
regarding WC settlements issued by the TPA.
7. Provide trainln' q as appropriate, to staff related to the
District's Worker,§"Compensation policy/program.
4.2 Purchasing Division
1. Act as the District liaison for all contract related issues with
the TPA.
4.3 Human Resources Department
1. Upon hire, notify employees of their right to designate a
physician for treatment related to an injuryrllness under
Workers' Compensation.
2. Meet with appropriate employee groups to discuss issues
related to Workers' Compensation provisions
4.4 Employee Development Division
1
2. Maintain employee training records for at least the duration
of the individual's employment with the District
5 of
Workers' Compensation Benefits Program SAFETY-POL-402
4.6 Employees
1. Immediately report any work related injury/illness to your
supervisor.
2. Complete the Workers' Compensation Claim Form and
submit it to the Safety and Health Division no later than one
business day following a reported WC incident.
A. Employees are not required to return to work the next
business day in the event of a medical emergency or if
they are incapacitated.
3. During the initial visit with the treating physician, inform
him/her of the District's Early Return to Work (ERTW)
(SAFETY-POL-404) program. Request that the physician
take this into account when determining the treatment
process and to contact the District's Safety and Health
Division for assistance.
4. Employees must request the time off in advance of all non-
emergency medical appointments.
A. Requests must provide the information about the
appointment including: schedule date and time and
treatment type, (i.e., doctor visit, physical therapy, etc.).
5. Employees shall submit medical certification of the
appointment satisfactory to the Safety and Health Division
which includes :
A. The date of injury;
B. Physician's name, signature, and telephone number;
C. Time in and time out for each appointment documented
on the appropriate form.
6. Appointments are to be scheduled at the beginning or end
of the employee's work shift whenever possible.
7. Appointments may be scheduled by the employee, the
Safety and Health Division or the TPA.
8. Employees shall report to work and work a minimum of five
hours on the day of the appointment.
9. A maximum of two and one half hours of SI leave including
transportation time and treatment time shall be authorized
6 of
Workers' Compensation Benefits Program SAFETY-POL-402
per visit subject to approval.
A. A maximum per week of 7.5 hours is allowed.
B. Time charged to this benefit shall be coded on the time
card as SI for sick industrial.
C. Time for actual travel distances shall only be
authorized.
10. Additional time taken off in excess of 7.5 hours shall be
coded as sick or personal leave subject to approval,
provided that the minimum of five hours has been worked.
11. Leave with pay shall be coded an thefime naFd as 21 to
Rink meal,
12. No overtime may be claimed for appointments outside of
regular work hours.
13. Appointments outside of regular work hours are not
compensable.
4.6 Supervisors and Managers
1. Notify the Safety and Health Division on the date of injury or
illness.
2. Ensure the affected employee(s) files a WC claim form and
submit it to the Safety and Health Division no later than the
next business day following the reported incident.
A. Employees are not required to return to work the next
business day in the event of a medical emergency or if
they are incapacitated.
3. Contact the Safety and Health Division to determine the
status of a claim prior to approving leave.
4. Provide copies of the time off request and medical
certification to the Safety and Health Division within one day
of the medical appointment date.
5. Submit timecards with Sl charges to the Safety and"Health
Division for review and approval by noon,on Friday prior to
the timecard being submitted to the "Finance-Payroll
Division.
7 of 8
Workers'Compensation Benefits Program SAFETY-POL-402
5. Program Administration and Evaluation
1. The District's WCP shall be managed and administered
by the Safety and Health Division.
2. The Safety and Health Division shall at least annually
evaluate the District's WCP to ensure that it is in
compliance with state and federal laws and regulations.
6. References
California Senate Bill 899 and all referenced California Labor
Code Sections
SAFETY-POL-404, Early Return to Work Program
SAFETY-SOP-402 Workers' Compensation Program
Workers' Compensation Claim Form
7. Attachments
None
8 of
ORANGE COUNTY SANITATION DISTRICT
Safety and Heakh Division
SAFETY-POL-405
Safety and Health Training
APPROVALS
Approved by: Date:
Director of Human Resources
Approved by: Date:
Human Resoure Manager
Approved by: Date:
Safety and Health Supervisor
PROCEDURE REVISION HISTORY
Rev. Date Approval
0 MM06 L.Tomko
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and Health
public folder to ensure that they have the latest version.
Safety and Health Training Program SAFETY-POL 405
Contents
1. Purpose ...............................................................................................3
2. Definitions ...........................................................................................3
3. General-Early Return to Work............................................................4
4. Responsibilities ..................................................................................4
4.1 Supervision/Management.........................Errorl Bookmark not defined.
4.2 Safety and Health Division .......................Errorl Bookmark not defined.
4.3 Employees ...............................................Errorl Bookmark not defined.
4.4 Employee Development Division..............................................................5
4.5 Human Resources Department................ Errorl Bookmark not defined.
5. Permanent Restrictions......................................................................6
6. Program Administration and Evaluation...........................................6
7. References ..........................................................................................7
8. Attachments........................................................................................7
2 of
Number: SAFETY-POL-405
FS Orange County Sanitation District Revision Number: 0
Safety and Health Training Program Date: March 22, 2006
Approved by: Lisa L. Tomko
1 . Purpose
The purpose of this policy is to establish administrative and
technical guidelines for providing employee training related to
occupational/environmental safety and health disciplines.
Effective implementation of this policy will ensure all affected
employees will receive safety and health training that meets
regulatory requirements and supports the organization's
endeavor to promote best management practices.
2. Definitions
Employee An employee as is defined in Division 4 of the California Labor
Code, or the employee's designated representative.
Manager An employee who :
• Manages, plans, supervises and
coordinates the operations and activities of
one or more major OCSD divisions and
works under general direction or
administrative direction of a Department
Director of the General Manager,
exercising discretion in applying general
goals and policy statements and in
resolving organizational and service
delivery problems and;
• Organizes and directs the work of
subordinate staff, and;
• Assumes significant responsibility for a
variety of personnel activities in such areas
as selection, training and disciplinary
actions and;
• Assumes significant responsibility for the
preparation and administration of the
assigned budget(s)
Supervisor An employee who:
3 of
Safety and Health Training Program SAFETY-POL�06
• Supervises, assigns and reviews the work of subordinates in
assigned sections or work units and;
• Works under direction or general direction of higher level
supervisory or management staff, exercising discretion in
selecting appropriate resources to use in accomplishing
assigned work and;
• Assumes responsibility for recommending a variety of
personnel actions in such areas as performance evaluation,
training, selection and disciplinary measures and;
• Ensures that appropriate policies and procedures are
followed by subordinates and;
• Monitors, coordinates and assists in developing the budget
for assigned area
3. General Background
In the first quarter of 2005, the Human Resources Director
commissioned a consultant to conduct a study of the Human
Resources Department's organizational structure. As a
result of that study's recommendations and a desire to
increase the effectiveness of the Department's service to
the organization, it was decided to return primary
responsibility for safety and health related training back to
the Safety and Health Division (530). This directive became
effective in April 2005. This policy will define the roles and
responsibilities for applicable organizational members in
order to effectively provide this service to all applicable
District employees
4. Responsibilities
4.1 Safety and Health Division
The Safety and Health Division ISM) shall be responsible for
the following:
1. Developing S&H training profiles and curricula for courses
taught by District staff.
2. Establishing a S&H training course catalogue (with course
descriptions), S&H training profiles for each District job
4 of
Safety and Health Training Program SAFETY-POL-405
classification and an annual course calendar.
3. Coordinating and scheduling all S&H training courses taught
by District staff and contractors (including approval of
contractor-provided training curricula).
4. Instructing specified S&H courses as determined by the S&H
Division.
5. Acting as the District's liaison for contractors providing S&H
training.
6. Controlling budget expenditures for all resources (i.e.,
supplies, training aids, contractor services, etc.) required for
S&H training.
7. Coordinating applicable recordkeeping, including maintaining
training records for at least the duration of an employee's
employment with the District, and compiling/evaluating
performance metric data.
8. Providing periodic performance management updates to
Executive Management staff and the Board.
4.2 Contracting, Purchasing and Materials Management Division
1. Acting as the District liaison for all contract related issues
related to contractors providing S&H training services.
4.3 Employee Development Division
1. Maintaining the District's Training Records Management
System database.
2. Coordinating management of the S&H training budget with
the S&H Division
4.4 Employees
1. Attending S&H training classes at their original date, time
and location.
2. Informing their respective supervisor, within one business
day, when the employee is aware of a known scheduling
conflict.
5 Of
Safety and Health Training Program SAFETY-POL-4N
4.6 Supervisors and Managers
1. Scheduling applicable staff using the District's Training
Records Management System database.
2. Notifying the S&H Division, no later than 30 minutes prior to
the scheduled start of S&H training class, of an employee
who will be absent.
5. Permanent Restrictions
If after the ninety-day (90) Early Return to Work accommodation,
the employee is unable to return to full/unrestricted duty, the
supervisor will work with the Safety and Health Division, the
employee and the medical authority to determine if a time
extension if appropriate. If approved, a written confirmation
detailing the length of the time extension, and any job
assignment modifications, will be issued by the Safety and
Health Division to the employee and supervisor within five (5)
business days.
If the time extension is not granted, the employee will be advised
of his/her right to apply for a permanent accommodation under
the provisions of the American with Disabilities Act. The Safety
and Health Division will provide assistance to the employee
during this process. During the transition period, the employee
will continue to work under conditions of the existing modified
work assignment unless the medical authority does not approve.
At which time, a revised modified assignment will be completed
in a manner consistent with the original.
6. Program Administration and Evaluation
The Safety and Health Division shall at least annually review
and revise, as necessary, the following elements related to
S&H Training:
1. Training catalogue
2. Performance management metrics
3. Contract training services
6of7
• Safety and Health Training Program SAFETY-POL-405
4. Annual training calendar
7. References
SAFETY-POL-101, Injury and Illness Prevention Program
Safety and Health Training Catalog
Safety and Health Training Profiles
8. Attachments
None
7 of
OMTS COMMITTEE Mee"Date To W.or M.
02/07/06 OWZZ106
AGENDA REPORT 10an Niniber N""ix'
DM7506-07 16
Orange County Sanitation District
FROM: Jim Herberg, Director of Operations and Maintenance
Originator: Eugene Yanza, Engineer
SUBJECT: CATIONIC POLYMER CONTRACT SPECIFICATION NO. C-2003-143
GENERAL MANAGER'S RECOMMENDATION
Approve renewal of Purchase Order No. 101758-OB for Purchase of Cationic Polymer,
Specification No. C-2003-143, issued to Polydyne Inc., with a unit rate increase of$0.70
per active pound for Solution Polymer increasing the total price to $1.75 per active
pound plus tax, and a unit rate increase in Mannich Polymer of$0.249, increasing the
total price to $1.529 per active pound plus tax, for an estimated amount of$1,280,000
for the period July 1, 2006 through June 30, 2007.
SUMMARY
• Cationic polymer is used for thickening secondary sludge before digestion and
also for ciewatering biosolids. There are two types of cationic polymer used at
the Sanitation District: solution polymer and mannich polymer.
• In fiscal year 2003-04, Polydyne, Inc. was awarded a one-year contract to
provide cationic polymer after competitive bidding based on performance trials
with different polymers from five vendors. The contract includes a provision for
four one-year contract renewals if mutually acceptable contract terms can be
negotiated. The contract was renewed for fiscal years 2004-05 and 2005-06 at
the original bid price.
• The contract provides for the option to renew the contract at higher or lower unit
prices depending on market forces such as changes in costs for raw materials
and/or fuel. The contract does not require Polydyne to renew the contract at the
original contract price.
• Polydyne has offered to enter into another one-year renewal through June 30,
2007, but at a price of$1.75 per active pound for solution polymer, and $1.529
per active pound for mannich polymer. The proposed increases are $0.70 and
$0.249 per active pound respectively. Polydyne has provided information to the
Sanitation District documenting increases in fuel and raw material costs.
• Staff has also researched other treatment facilities in Southern California and has
determined that Polydyne's proposed cost is the same bid price as other
agencies (City of Los Angeles, and Los Angeles County Sanitation District) with
similar-sized contracts.
• The contractor, Polydyne, has provided satisfactory service during the current
contract term and has proven capable of providing the required volume of
polymer for District operations.
• Staff recommends that the contract for both Solution and Mannich polymers be
extended for an additional one-year term.
PRIOR COMMITTEE/BOARD ATIONS
• In fiscal year 2003, Polydyne was awarded a one-year contract (2004-2005) for
the amount of$900,000 which was increased with a change order to $913,000
because of the higher approved budget amount for solution polymer.
• The contract was amended on September 22, 2004 to include both solution and
mannich polymer and the amount was increased with two change orders to
$1,538,000 to cover expenses for unanticipated polymer use during that year.
PROJECT/CONTRACT COST SUMMARY
OCSD Cationic Polymer Cost Summary
Active FY 05-06 FY 05-06
Pounds Budget Price Per Pound
Solution Polymer 222,100 $233,205 $1.05
Mannich Polymer 582,500 $745,600 $1.28
Active FY 06-07 FY-06-07
Pounds Budget Price Per Pound (Proposed)
Solution Polymer 222,100 $388,675 $1.75
Mannich Polymer 582,500 $891,225 $1.53
BUDGETIMPACT
® This item has been budgeted. (Line item:45)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
The proposed unit price increase is for FY 06-07 and would be included in the Sanitation
District's FY 06-07 budget.
Page 2
ADDITIONAL INFORMATION
The Sanitation District has experienced utility and chemical cost increases as shown below:
OCSD Chemical / Utility Cost Increases (with tax)
Unit Cost Unit Cost Percent
Chemical /Utility FY 04-05 FY 05-06 Increase
Muriatic Acid $0.46/gal $0.59/gal 28.3%
Sodium Hypochlorite $0.4988/gal $0.67121gal 34.6%
Sodium Bisutfite $0.44491gal $0.5214/gal 17.2%
Ferric Chloride $0.86/gal $0.96/gal 11.6%
Electricity $0.105/kWh° $0.170/kWhe 61.9%
Natural Gas $0.66Aherm $1.10/thenn` 66.7%
ALTERNATIVES
Do not extend the contract with Polydyne, and instead conduct polymer performance
trials and competitive bidding. This option would cost approximately $40,000 for staff
time and materials. Based on data from competitive bidding at other agencies, it is
Staffs opinion that conducting performance trials and re-bidding would not result in a
better price.
CEQA FINDINGS
Not applicable
ATTACHMENTS
None
H:WeptlomlBlOTieldsWGENDAWgerWa Repod(Canonic Polymer Pete Increase)Yarma(Herberg revision M-06).doc
Page 3
BOARD OF DIRECTORS Pe—. 9Dab: Ta ad.uf Dir.
a3/22/oa
AGENDA REPORT Rem Number 1 Item Number
IJ
Orange County Sanitation District
RW ades a Facilities
FROM: David Ludwin, Director of Engineering
Originator: David May, Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION, JOB NO. 1-2-4
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the Professional Services Consultant Agreement with
Albert Grover and Associates, providing for engineering services for the Bushard Trunk
Sewer Rehabilitation, Job No. 1-2.4, for an additional amount of$65,000 increasing the
total amount not to exceed $153,000.
SUMMARY
• A sole source justification was approved by the General Manager for a traffic impact
analysis and mitigation report prepared by Albert Grover and Associates (AGA).
Based on this a Professional Consultant Service Agreement was awarded to AGA in
October 2005 for$88,000 to prepare this report.
• The report prepared by AGA recommended mitigations to address traffic impacts.
The cities of Fountain Valley and Huntington Beach have requested detailed
engineering plans of proposed mitigation measures. The detailed plans develop the
mitigations proposed by AGA. Both cities have requested that detailed plans be
prepared, submitted, and approved before an encroachment permit will be issued.
• Additional engineering services are required from AGA. The additional engineering
services needed are for preparation of detailed engineering plans as required by the
cities. The recommended mitigations developed in the February 2006 report
prepared by AGA will be developed into engineering plans that will be submitted to
the cities.
• Staff is requesting the Board of Directors approve this Amendment No. 1 without
prior review by the PDC. Approval of this amendment will allow the closure of the
intersection at Ellis Avenue and Bushard Street to proceed as scheduled and
coordinated with the city of Fountain Valley.
PRIOR COMMITTEE/BOARD ACTIONS
There have been no previous Committee or Board actions. A Professional Service
Consultant Agreement was awarded to AGA by the General Manager for $88,000 on
October 27, 2005.
n.m..a. auwroe Page 1
i
PROJECTICONTRACT COST SUMMARY .,
See attached Budget Information Table
BUDGET IMPACT
® This item has been budgeted. (Line item: 2005-06 Budget Book. Page 8-07)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
In October 2005 the General Manager approved a sole source justification and
subsequent professional service consultant agreement with AGA. A traffic impact
analysis and mitigation report was prepared and eventually finalized in February, 2006.
All work related to report preparation has been completed. The final report was
provided to the cities of Fountain Valley and Huntington Beach for review.
Staff has met with counterparts at the cities of Huntington Beach and Fountain Valley to
discuss mitigation measures recommended in the AGA report. At a meeting held March
6, 2006 implementation of the recommended mitigations presented in the February
2006 AGA report was discussed. The mitigations will minimize or eliminate traffic
impacts. They consist of signal timing adjustments, addition of signals that would allow
protected turn movements, and addition of left or right hand turn lanes. Lane additions
require median demolitions and reconfigurations in some cases. Lane additions also
require traffic lane re-striping.
At the meeting it was learned that the cities require that the mitigations recommended in
the AGA report be developed into detailed engineering plans showing details of
construction. Both cities require the review and approval the detailed plans prior to
issuing their encroachment permits. Five separate locations with recommended
mitigations require further detailed engineering plans for the cities to review and
approve. Three of these locations are in Fountain Valley and two are in Huntington
Beach.
Staff is requesting the Board of Directors approve this Amendment No. 1 without prior
review by the PDC. Approval by the Board of Directors at the March 2006 meeting will
allow the project to continue as scheduled. Staff has closely coordinated with the City
of Fountain Valley on the timing of intersection closure. To keep this timing, permits
need to be issued promptly. The cities need to review and approve the detailed
engineering plans prior to issuing permits. Intersection closure is scheduled for late
March, early April 2006.
Page 2
t ALTERNATIVES
t Authorize the additional services through normal procedures of PDC presentation, then
Board action. This procedure requires approximately 2 months of time and would delay
the start of the intersection work and closure by approximately 2 months. Public
outreach communications would need to be adjusted and staff would need to further
coordinate with the City of Fountain Valley. Construction work at the end of the delayed
time frame would occur in the rainy season. This could result in additional delay if work
tasks are delayed by weather that would not be encountered without the delay.
CEQA FINDINGS
The Program Environmental Impact Report (EIR) was certified in 1999 by the Board of
Directors. Addendum No. 8 to the Program EIR was certified at the February 2006
Board meeting.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Albert Grover &Associates Additional Services Proposal
DM:eh
H1ntg1obaNAgenda Draft ReportsUoint Bmrds4-24A Albert Gr er_PCSA_Add 1 (a).dm
Rwiw 01ro Page 3
BUDGET INFORMATION TABLE
Bushard Trunk Sewer Rehabilitation
JOB NO. 1-2-4
ORIGINAL CURRENT PROPOSE0 PROP0SE0 FUNDS 1X18 PROPOSED TOTAL E6TMATED EBTMATED
BUDGET
PROJECTN'NA9E AUTUDGET PROJECT BUDGET AUTHOATEO TO AUTHOR STON E%TO DATE
EXPENDED TO
' BUDGET BUDGET INCREASE BUDGET DATE ' REQUEST AUTHORI2AnON TO GATE DATEI%)
IOECREASE
Phase I-Prgttt Develo men, E 74000 E 74.000 E 74,000 E 74000 E 74.000 E ]45]5 101%
Phase 2-Prollmind Design $ 10,000 3 10000 S 10,000 $ 10.000 5 10000 $ 8161 02%
Phan 3-Deel n S 2.186000 $ 2.188,000 S 2.168000 5 216SOBD S 2.166,000 S 2174.531 lam
Phafe 4-Cona0u069n $ 48142,000 S 58112000 1 8 58,142000 1 l$ 49,384.962 $ 48.994802 S MR7306 52%
Phan,S-conanaonln S 416M $ 416,000 $ 416000 S 325.000 $ 326.000 $ 281509 ]]%
Phan,B-Cbee.Oul $ 72000 $ 72000 $ 72000 S 40,000 E 40000 S 18S] 4%
MOOT-Conan on 3 2688.000 $ 2.686,000 S 2.809000 S 2088000 S 2698000 0%
PROJECTTOTAL 3 53,580,000 S 60,660,000 S - $ 03,550,000 S 54,]10,062 S - E 54.]10,962 $ 28,038,739 81%
Relmburn,ble Coati
PROJECTNET 1 S 53,650,000 1 $ 83,5801000 $ - $ 63,580,000 1 1 S 54.710,982 E - S 54,710,982 1 8 28,038.739 1 51%
PSAIContracl
Design P A- S 649.300 S 3467525 S 2467825 r' $ 2407,825 S 2,467,825 $ 2.168,745 88%
CMPSA-EAMTech 3 200D000 8 2052,983 $ 2,052.593 S 2052593 $ 2052.W3 $ 0%
DnInPSA-Malegm Pimle E - $ 85108 S 85108 $ 88108 $ 85106 $ 85000 t00%
Baftn PSCA-AIheN Grover S 86000 $ W,W0 16E000 S 08000 S $SIM $ 153.000 5 88,000 58%
PlOo Prearemenl-624P 8 - $ ]BBB]]] $ 1890777 $ 1698777 S 7888727 E 0%
DOn00Mon COnWlal Reece S 00.2n 834 $ 34888700 3 N888.]06 S 3488B100 $ 34860,]OB $ 16,247.398 47%
DomBuoaon Cograq-42-IA 3 10000000 i 11191,500 E I11B1800 S 11181,500 i 11p B1500 S 0%
SouNem Calaomla EOlaon $
- 5 350000 i 390.000 '4 8 380000 350000 i 0%
EDNI&003508220
Professional Services Agreement Status Report
Job No. I-2-4A
Total Project Budget: $63,580,000
Consultant: Albert Grover& Associates
Start Date of Project: October 27, 2005
Date Amendment Description Cost Accumulated
Costs
10/27/2005 Original Traffic Impact Analysis and Mitigations—Original $88,000 $88,000
PSCA PSCA awarded by GM
Additional Engineering Services— Preparation of
Pending 1 Detailed Engineering Plans for Proposed $65,000 $153,000
Mitigations
EDM3:003805259
v
ALBERT
GROVER&
A SOCIATES
March 8,2006
Mr.David K. May,P.E.,P.M.P
Project Manager
Integrated Program Management Consultants
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley,California 92708
RE: Cost Proposal for Traffic Engineering Services Related to Ellis-Bushard
Intersection Closure(OCSD 1-24A Project)
Dear Mr.May:
Because Orange County Sanitation District (OCSD) is proposing to close the intersection of
Ellis Avenue and Bushard Street due to construction related activities for the "Bushard Trunk
Sewer Rehabilitation Project 1-24A" for approximately seven to nine months beginning in
March/April 2006, it has been detemrined that certain area-wide traffic improvements will
relieve associated congestion.
Pursuant to your request Albert Grover&Associates(AGA)is pleased to present to OCSD this
proposal detailing the scope of work, schedule and cost to provide engineering services to
prepare construction plans at selected intersections in the cities of Fountain Valley and
Huntington Beach, and to assist OCSD in procuring the required permits from respective
agencies for the proposed improvements. The signal modification plans will be actual
construction ready plans signed by an AGA registered engineer and approved by the respective
City such that OCSD can proceed with construction of the proposed improvements.
AGA has developed the following scope of services based on the agency approved results of the
"Traffic Impact Analysis for the proposed Temporary Closure of the Ellis Avenue/Bushard
Street Intersection," prepared by Albert Grover & Associates, February 9, 2006; discussions
with you and other OCSD staff and the cities of Fountain Valley and Huntington Beach; and
our own experience dealing with traffic engineering issues and signal timing in the Cities of
Fountain Valley and Huntington Beach. The project scope relates to the preparation of
construction plans and signal timing adjustments required to implement the agreed upon
mitigations per our meeting of March 6,2006 at Fountain Valley City Hall,and to assist OCSD
in procuring the required permits from the cities of Fountain Valley and Huntington Beach.
TRANSPORTATION CONSULTING ENGINEERS
211 E.Imperil Hwy.,Suite 208.Fullenw.CA 92S35
(714)992-2990 FAX(7M 992-2883 GMea: egeQa alberlgrover.com
i
Mr.David K. May, P.E.,P.M.P
March 8,2006
Page 2
Task I —Brookhurst Street/Slater Avenue and Brookhurst Street/ralbert Avenue Traffic
Signal Modifications
• Prepare traffic signal modification plans for Brookhurst Street/Slater Avenue and
Brookhumt StreeVralbert Avenue, for the installation of right-turn overlap phasing for
the eastbound approach (on Slater Avenue and on Talbert Avenue). Construction plans
will be prepared per the requirements of the City of Fountain Valley. AGA will submit
preliminary plans by March 15, 2006. After review and comments by the City, AGA
will submit final signed plans by March 20, 2006. An engineer's estimate for the
construction of the proposed improvements will be provided to OCSD. AGA's fee to
complete this task is$10,000.
Task 2—Magnolia StreetiTalbert Avenue Traffic Signal Modification
• Prepare a construction plan for traffic signal modification for Magnolia Streetrralbert
Avenue for the installation of right-turn overlap phasing for the northbound approach
and median removal on the east-leg of the intersection, and prepare plans for required
striping modifications to achieve dual westbound left-tum lanes, including all transition
striping to join existing roadway striping on both sides of the intersection. The initial
phase involves the preparation of a full size concept plan after discussing with the City
of Fountain Valley. The second phase involves the preparation of detailed construction
plans after the concept plan is approved by the City. AGA will prepare and submit
separate signal and striping modification plans by April 21, 2006. AGA's fee to
complete the first phase is $6,500. AGA's fee to complete the second phase is $5,500.
Additionally, an engineer's estimate for the construction of the proposed improvement
will be provided to OCSD. AGA's total fee for both phases is$12,000.
Task 3—Magnolia Street/Adams Avenue Traffic Signal Modification
• The proposed improvement involves the implementation of dual left-tum lanes on
Magnolia Street at Adams Avenue. The initial phase involves a detailed capacity
analysis of the intersection to evaluate the effectiveness of dual left-turn lanes on
Magnolia Street, and the development of a full size concept plan to evaluate its
feasibility. The installation of dual left-turn lanes on Magnolia Street would require the
removal of the median on the south-leg of the intersection. If the City of Huntington
Beach concurs with the proposed design,the second phase involves the preparation of a
detailed construction plan for the implementation of dual left-turn lanes on Magnolia
Street at Adams Avenue. AGA will prepare and submit traffic signal and striping
modification plans, including all transition striping to join existing roadway striping on
both sides of the intersection by April 14,2006. Additionally,an engineer's estimate for
the construction of the proposed improvement will be provided to OCSD. AGA's fee to
Y
Mr.David K.May,P.E.,P.M.P
March 8,2006
Page 3
complete the first phase of this task is$7,500. AGA's fee to complete the second phase
of this task is$5,500.AGA's total fee for both phases is 513,000.
Task 4—Newland Street/Slater Avenue Traffic Signal Modification
• The proposed improvement involves the installation of protected/permissive left-turn
(PPLT)phasing on all approaches at the Newland Street/Slater Avenue intersection. The
City of Huntington Beach has stated that a pedestrian signal,located approximately 400
feet west of this intersection, shares the signal controller located at Newland/Slater
intersection. The City has indicated that the proposed signal phasing modifications at
Newland/Slater would require the need for a new signal controller. This will be
considered during the design phase of the proposed signal modification. Additionally,
aside from this, the proposed signal modification can be achieved in two ways. One
approach is the installation of cluster signal head indication for PPLT on existing poles
and mast-arms and the second approach is the installation of new poles and longer mast-
arms along with the required PPLT signal head indications per the requirements of the
City of Huntington Beach. AGA will prepare and submit the traffic signal modification
plan by April 21,2006. Additionally, an engineer's estimate for the construction of the
proposed improvement for each of the approaches will be provided to OCSD. AGA's
fee to complete the signal plans per the requirements of the cities of Fountain Valley
and Huntington Beach is$10,000.
Task 5—Signal Timing for Modified Traffic Signals
• All additional signal timing changes that will be required as a result of construction of
the above defined 'improvements (Tasks I thin 4) will be completed under this task.
Preliminary timings will be provided to the respective agency prior to construction, and
after City approval and construction of proposed improvements,the new signal timings
will be installed.AGA's fee to complete this task is$5,000.
Task 6—Engineering Suotrort
• Provide technical traffic engineering support and assist OCSD in procuring the required
permits related to the Ellis-Bushard closure from the cities of Fountain Valley and
Huntington Beach. Project coordination efforts, including obtaining approvals for the
above defined traffic signal modification improvements,providing required information
to the contractor, providing technical assistance during construction, and to assist in
obtaining City permits to enable Ellis-B u;bard closure, are all included under this task.
AGA's fee to complete this task is$15,000.
Mr. David K. May,P.E.,P.M.P �
March 8,2006
Page 4
Our fee to complete Tasks I thru 6 will amount to a maximum not-to-exceed amount of
$65,000.
We look forward to working with OCSD and the Cities of Fountain Valley and Huntington
Beach in this challenging project. Should you have any questions regarding this proposal,please
contact me.
Respectfully submitted
ALBERT GROVER&ASSOCIATES
[Original Signed By]
Chalap K. Sadam,P.E.
Vice President
C.C. Mike Bock,OCSD
CSIOCSDTretac EnSServicesmid Cwm d.Pl.Pre .i.Pmpaul-Olis_11C Closwn
BOARD OF DIRECTORS Meeang Date To Bd.of Dir.
03/22/06
AGENDA REPORT Rem Number Dem Number
'i I6
Orange County Sanitation District
FROM: Robert P. Ghirelli, Director of Technical Services
Originator: Mahin Talebi, Source Control Manager
SUBJECT: Settlement Proposal for the Administrative Complaint issued to Omni
Metal Finishing, Inc. of Fountain Valley, CA; Class I Industrial Wastewater
Permit No. 2-1-520
GENERAL MANAGER'S RECOMMENDATION
1. Receive and file the letter dated March 6, 2006 from Omni Metal Finishing, Inc.,
regarding a settlement proposal for Administrative Complaint re Permit No. 2-1.520;
and,
2. Authorize the General Manager to negotiate and enter into a settlement agreement
with Omni Metal Finishing, Inc., which would impose a maximum of$55,000 in
administrative penalties against Omni and require Omni to make improvements and
additions to Omni's existing pretreatment facility to ensure compliance.
SUMMARY
• The District's Source Control Division issued an administrative complaint to
Omni, a metal finishing facility located in Fountain Valley, for violations of its
industrial wastewater discharge permit. The complaint proposed a penalty of
$55,000 and 15 day permit suspension. Omni has offered a settlement proposal
that includes payment of the $55,000 penalty, payable over a 12 month period,
and significant improvements to their waste treatment system.
• The District's Resolution No. OCSD-98-23 requires Board of Director's approval
of a proposed settlement amount greater than $50,000.
• Staff recommends that Omni be offered the option for settlement of a $55,000
penalty without permit suspension.
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
The cost of the project to Source Control to date has been $12,463.27
Hidednagenda%B dAgenda R¢oonsd?006 Board Agenda 8 Agenaa ReNB1WWVlem 18 O 1AteWAM
Reoiaan. B11Ba,BB Page 1
BUDGETIMPACT
i
❑ This item has been budgeted. (Line Item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
• Omni operates a metal finishing and plating facility located in Fountain Valley,
California. Omni receives parts from military and commercial aerospace, aircraft,
electronics and marine manufacturers and performs various metal finishing and
plating operations parts. The wastewater is being treated prior to discharge using
a metal precipitation process along with clarification and sludge dewatering.
Omni's average discharge volume is 40,000 gallons per day (GPD).
• Victor Salazar has been the person responsible for the operations at Omni. Since
May 1981 Omni has had an Industrial Wastewater Discharge Permit (Permit)
issued by the Orange County Sanitation District (District).
• In mid 1980s and following the issuance of the permit, Omni installed an adequate
pretreatment system to handle the contaminated waste streams generated at its
facility. The system has been in operations for the past several years. Because
of the ageing of the equipment and lack of adequate operation and maintenance
of the pretreatment system, since 2000, on-site sampling of the wastewater
discharges at the Omni facility has shown occasional non-compliance. Due to
these occasional incidents of non-compliance, Omni was subjected to resample
fees, compliance inspections and orders to correct the instances of non-
compliance. Because Omni had an adequate pretreatment on site, long term
compliance was not in question.
• Due to the persistence and sporadic nature of the violations, in 2004 the District
initiated an evaluation of Omni's operations and wastewater management
systems. During an inspection and also in a follow up compliance meeting that
took place in 2004, the District observed and notified Omni of problems in its
operation and maintenance of the wastewater treatment systems.
• As part of its on-going evaluation of Omni, the District conducted a monitoring
program in the downstream sewer line from February 6, 2005 to February 15,
2005 that bracketed the Omni facility. The District conducted parallel on-site
monitoring of sources upstream of Omni to ensure that the results of the sampling
were representative of Omni's discharge. .
• During this period the District performed a total of ten 24-hour composite samples.
Heavy metals violations were found during three days of sampling for cadmium,
nickel, chromium, copper, lead and zinc. Three of the 24-hour composite
samples showed non-compliance and six heavy metal violations. The results
H Wolegmda\&oad AgeWla RexrlsVM&,ard Apm&I&A,Me IlWaWW] Iem IS Om,l Mehl Eoc
Re,,Wd mmnmc Page 2
showed cadmium concentrations of 10.7 mg/L and 22.9 mg/L, chromium
° concentrations of 3.00 mg/L and 5.05 mg/L, copper concentrations of 4.74 mg/L
and 7.94/mg/L, Lead concentrations of 1.91 mg/L and 3.38mg/L, nickel
concentrations of 46.20 mg/L and 163.00 mg/L, and zinc concentrations of 6.61
mg/L and 79.6 mg/L.
• Upon obtaining the final results of the sampling, in May 2005 the District issued
Omni an Order to Cease Non-Compliant Discharges and advised Omni of its
intent to issue an Administrative Complaint. Omni proceeded with developing
proposals for modifying the pretreatment system, while the District conducted
further on site and downstream monitoring to further evaluate compliance.
Although the results of the second downstream monitoring indicated compliance,
Omni's capability to demonstrate long-term compliance and correcting the source
of the violations was questionable.
• On February 3, 2006, the District issued an Administrative Complaint to Omni in
which staff recommended that administrative penalties in the amount of $55,000
dollars be imposed. The penalties were determined based on the number of days
Omni was in violation and the severity of the violations during the sampling
period. The District levied the maximum penalty of$5,000.00 per day per incident
for a total of 11 violations. The Administrative Complaint also recommended 15
days permit suspension as part of the penalty. An administrative penalty and
permit suspension hearing was scheduled for March 16, 2006. Because of a
settlement request by Omni, the hearing is postponed.
• In response to the findings of the monitoring and of the Administrative Complaint,
Omni proceeded to develop and propose corrective actions, which included the
hiring of a consultant to effectively review Omni's processes, pretreatment and
operations. The first action taken by Omni was to develop proposals to close loop
the cadmium and nickel operations, which were the source of the majority of the
violations. In the interim, the District conducted additional downstream monitoring
of the facility and found no instances of non-compliance.
• The settlement will require, Omni to develop and implement under the terms of
Environmental Compliance Schedule Agreement the following to ensure
compliance with all the conditions of the permit and the Ordinance: 1) perform a
detailed waste characterization study to account for all waste streams; 2) identify
and terminate all connections that may allow bypassing the pretreatment system;
3) provide a secured enclosure for District sampling that prevents public access or
loss of District sampling equipment; and 4) provide all necessary systems and
modifications to ensure long-term compliance. In addition, and at its own
suggestion, Omni will implement 1) closed loop treatment of all wastewater from
its cadmium plating line; and 2) closed loop treatment of all wastewater from its
nickel plating line. Wastewater from both systems will not be discharged to the
sewer. Close looping of cadmium and nickel is considered an advanced system
that results in actual elimination of the cadmium and nickel bearing wastestream
discharges to the sewer.
H.WepMgmftB AB°na Rep•MVM Boob ABenUe 6 Ap aRagHaWJ lmmom1 WWI.dw
R.nW.01 aM Page 3
• As part of the Administrative Complaint process, the staff has evaluated Omni's
overall status and also Omni's commitment and willingness to implement °
comprehensive program and state of the art equipment/structures necessary to
ensure compliance, staff recommends that Omni be offered the option for
settlement of a $55,000 penalty without permit suspension. At Omni's request,
staff also recommends that Omni render payment of the penalty in 12 monthly
payments, at an interest rate of prime plus 5%. At the current interest rate of
9.5%, the monthly payments amount to $4,822.59.
• The settlement will also include provisions regarding failure to meet the conditions
of the agreement, which include reinstatement of additional enforcement
proceedings.
ALTERNATIVES
The District could proceed with the hearing and impose the $55,000 and suspension.
Except for the suspension, which is not currently recommended by staff, there would be
no additional benefit either to the District or Omni from the results of a hearing. The
District would incur unnecessary legal and staff cost to conduct a hearing and also
impose on Omni additional cost that would not benefit compliance.
CEQA FINDINGS
ATTACHMENTS
Letterfrom Omni Metal Finishing, Inc. dated March 6, 2006
XMe%b9en]aBwNR nE Repm1020••B WA,.8FB'-X•Xe�N](6U�lem 18.Omti MCIaI.E[c
XevrseE:01MM Page 4
r
OMNI
March 6, 2006
Mr. James Ruth :3 -T
Interim General Manager — fTl
Orange County Sanitation District} ^ '
o Fn
10844 Ellis Avenue j
PO ox 8127
. , r7
Fountain Valley CA 92708-7018 0
Subject: Request for Extension of the Administrative Complaint Re Permit No. 2- 1.520
and Acceptance of the Terms of the Complaint
Dear Mr. Ruth:
Omni Metal Finishing appreciates the time OCSD staff spent with us Monday February
27, 2006, to discuss the above-cited February 3, 2006, Administrative Complaint that has
been filed against OMNI re overages of certain pollutant concentrations measured in our
discharges.
We are most concerned about these discharge measurements, especially since they are at
considerable variance with our self monitoring results for that same period. After
reviewing the Complaint, however, and meeting with OCSD staff, we Feel that we should
accept your data and request settlement of this matter through a)paying the assessed
penalty; and b)working to further improve our prevention-oriented waste water
management system. We therefore request an extension in the scheduled March 16
hearing on this Complaint so that a settlement can be effected.
11665 COLEY RIVER CIRCLE- FOUNTAIN VALLEY, CA 92708
Quality System Registered to ISO 9001/AS9100 Rev-B
w Omnimetal.com
OMNI
Mr.lames Ruth 2 March 6,2006
Orange County Same ion Distrito
Omni has not intentionally polluted. In its 25 years of operation Omni has constantly
striven to be a good corporate citizen and environmental neighbor. We do not condone
practices such as illegal dumping, and believe that proactive approaches to environmental
compliance are good business. We have developed a comprehensive wastewater
management system for our facility and are currently in the process of developing a state-
of-the-art closed loop recovery technology for nickel and cadmium, the two pollutants of
concern in this Complaint. When the system is operational—which we are hoping will
occur in the next few weeks—there will, in fact, be full recycling of nickel and cadmium
rinses, eliminating them from waste treatment and discharge. Omni takes environmental
protection very seriously and believes that pollution prevention investments made —in
personnel and dollar expenditures—will help the company maintain both its competitive
advantage and its standing as a socially and environmentally responsible Orange County
business operation.
We would like to be able to apply the money involved in the proposed assessment to
completion of our closed-loop system, but understand this is not possible. Because of
the double expenditures involved, however, we would most appreciate being able to pay
the penalty amount in installments over the coming twelve months, with monthly
installments in the amount of$4,583.33.
Because we are actively involved in the installation of the nickel and cadmium closed
loop, we respectfully request that the permit suspension of this Administrative Order is
waived. .
Thank you for your attention. We look forward to settlement of this matter.
11665 COLEY RIVER CIRCLE• FOUNTAIN VALLEY, CA 92708
Quality System Registered to ISO 9001/AS9100 Rev-S
v'+�xomnimemi.tom
OMNI
Mr.James Rath 3 Mmch 6,2006
Omttge Cmudy SaniGuon Disi icts
Yours very sincerely,
s�
President and CEO
cc; Ms. Mahin Talebi, OCSD
Ms. Adrianna Rensecue, OCSD
Azita Yazdani, PPI
a ,. C&-. 9,6(x, CLSD
C17ri5 S42ck.l l Oc Sil
11665 COLEY RIVER CIRCLE- FOUNTAIN VALLEY, CA 92708