HomeMy WebLinkAbout2005-09-28phone:
(7141 962-2411
fax:
(714) 962-0356
www.ocsd.com
mailing address:
P.O. 8ox 81 27
Fountain Valley. CA
92728-8127
street address:
10844 Ellis Avenue
Fountain Valley, CA
92708-7018
Member
Agencies •
Cities
Anaheim
Brea
Buena Park
Cypress
Fountain Valley
Fullerton
Garden Grove
Huntington Beach
Irvine
La Habra
La Palma
Los Alamitos
Newport Beach
Orange
Placentia
Santa Ana
Seal Beach
Stanton
Tustin
Villa Park
Yorba Linda
County of Orange
Sanitar y Districts
Costa Mesa
Midway City
Water Districts
Irvine Ranch
ORANGE COUNTY SANITATION D ISTRICT
September 22, 2005
NOTICE OF MEETING
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
WEDNESDAY, September 28, 2005 -7:00 P.M.
DISTRICT'S ADMINISTRATIVE OFFICES
10844 Ellis Avenue
Fountain Valley, California 92708
The Regular Meeting of the Board of Directors of the Orange County Sanitation
District will be held at the above location, time and date.
: ~ :/{/, '. /_/ { ( l t
B
CIP OVERSIGHT AD HOC COMMITTEE -Thursday, September 29, 2005 at 5:00 p.m.
GWR SYSTEM STEERING COMMITTEE -Monday, October 10, 2005 at 5:30 p.m. @OCWD
FAHR COMMITTEE -Wednesday, October 12, 2005 at 5:00 p.m.
PDC COMMITTEE -Thursday, October 13, 2005 at 5:00 p.m.
STEERING COMMITTEE -Wednesday, October 26, 2005 at 5:00 p.m.
To maintain world-class leadership in wastewater and water resource management.
BOARD MEETING DATES
*November 16, 2005
*December 21, 2005
January 25, 2006
February 22, 2006
March 22, 2006
April 26, 2006
May 24, 2006
June 28, 2006
July 26, 2006
August23,2006
September 27, 2006
*Meetings are being held on the third Wednesday of the month
H:\dept\pa\320\BS\Agenda\2005 Meeting Notices\MN9.2.doc
-q I ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
rjfD
') /.1 v TIME: 7:00 PM~ ~ ~ /~ ~ tJ=j3;--~ MEETING DATE: 9/28/05
(SIMONIAN) .................... ANDERSON ................... .L_ _L__ _f_ -1JL
(YOST) ............................ ANTOS ......................... _L __L_ _f_ _j_
(WILSON) ........................ BANKHEAD ................... _L_ k _.!::!.___ _i_
(AMBRIZ) .......................... CAVECCHE ................... ..JL. ?l/J.t. _'/ _ _Jjf_
(GARCIA) ......................... CHRISTY ..................... --1L..._ ~ _.!:!_ _j__
(COLLINS) ........................ CRANDALL. .................. _L_ ?'l~IP') _I_ _li._
(ROSEN) .......................... DALTON ....................... ~ / ..L_ _1_
(KAWASHIMA) ................. DAVERT.... ... . ... . . . . . . . .... ~ -:p--_y_ _u_
(SHAWVER) .................... Vaeant . . . . . . . .. . . . . . . . . . .. . ~ _t1_ _j__
(WILSON) ......................... DUVALL. ..................... ~ ~ _'/ _ _i_
(UNDERHILL) ................... ECKENRODE ................. ~ ~ J.L_ _1_
(SCHAFER) ...................... FERRYMAN ................... _L_ ~ _:f_ ~
(BORTLE) ......................... FRESCHI .............. ..... _L .:::::___ Y ±
(COOK) ........................... A IA"BV......................... V' _1L__ ,-
(CHOI) .............................. KANG .......................... _L _iL_ _i__ __M__
(SONDHI) ......................... LUEBBEN ..................... _L_ +-+-_j_ _j_
(DOW) .............................. MARSHALL. ................. _L i:::::._ _!::!____ J.L_
(REINHART) ..................... MILLES ......................... L._ _L._ ~ _:f_
(BEAUMAN) ..................... MOORE ........................ _L_ _L_ _'f_ _f_
(KIRKPATRICK-PILGER). NEUGEBAUER. .......... · ... L_ ~ _f _ _l:!._
(DRISCOLL) ..................... PARKER ....................... _lL_ ~ _'/_ _:L
(WEBB) ............................ RIDGEWAY ................... / -L-_j_ _tL_
(HERNANDEZ) ................. SIDHU.......................... v' ~ _t:d_ ~
(CORREA) ........................ SILVA ........................... ~ __L_ -'fr-_'/_
(RODRIGUEZ) .................. WALDMAN .................... _ __:!___ _ _:f_
STAFF:
Anderson ~
Arhontes v
B.:.-:. ···-I
Ghirelli /
Herberg /
Kovac /
Kyle /
Ludwin /
-j-~6'1091 ?'/.J-~I (~J
'f .i/1:-?3? '10/? 3110/ ?t/Df'_!,;J-¥J.l~ ?l/'1S'~tJ/?¥¥S-I/ ?t/ !;; (~
~ ,/J;f {,!~ ~~~
Miles ~ /I ~
fefflkO' ;II ~1~V ~
Tvner ,/
OTHERS:
Hoa in t/
Nixon
09/28/05
H:\dept\admin\BS\DIRECTOR\Directors Roll Call.doc
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE: 9/28/05 T!~~E: 7:00 PM
~~~
(SIMONIAN} .................... ANDERSON ................... ~ __ _
(YOST} ............................ ANTOS ......................... __j___ _ _ _
(WILSON} ........................ BANKHEAD ................... _j_ _ _ _
(AMBRIZ} .......................... CAVECCHE ................... _j_ __ _
(GARCIA} ......................... CHRISTY ..................... £___ __ _
(COLLINS} ........................ CRANDALL. .................. _'/ ______ _
(ROSEN} .......................... DAL TON ....................... _t_ __ __ __
(KAWASHIMA) ................. DAVERT ...................... i_ __ _
(SHAWVER) .................... ~t . . . . . . . . . . . . . . . . . . . . . _'/_ __ __ __
(WILSON) ......................... DUVALL. ..................... _j_ __ _
(UNDERHILL) ................... ECKENRODE ................. _L_ __ _
(SCHAFER) ...................... FERRYMAN ................... _i_ __ _
(BORTLE} ......................... FRESCHI ................... ~ _. ____ _
(COOK) ............................ ~tAR'.8¥......................... a.; __ _
(CHOI) .............................. KANG .......................... __i_ _ _ _
(SON DH I) ......................... LUEBBEN ..................... __1!._ _ _ _
(DOW) .............................. MARSHALL. ................. _M_ _ _ _
(REINHART) ..................... MILLER ......................... .li___ __ _
(BEAUMAN} ..................... MOORE ........................ _i_ _ _ _
(KIRKPATRICK-PILGER). NEUGEBAUER. .......... ~ .. _i_ __ _
(DRISCOLL) ..................... PARKER. ...................... _t_ _ _ _
(WEBB} ............................ RIDGEWAY ................... _y_ __ _
(HERNANDEZ) ................. SIDHU .......................... _i_ __ _
(CORREA) ........................ SILVA........................... Y __ _
(RODRIGUEZ) .................. WALDMAN .................... Y-__ _
STAFF:
Anderson
Arhontes
Beekman
Ghirelli
Herberg
Kovac
Kyle
Ludwin
Miles
Tomko
Tyner
OTHERS:
Hog in
Nixon
09/28/05
H:\dept\admin\BS\DIRECTOR\Directors Roll Call.doc
SIGN-IN SHEET
ORANGE COUNTY SANITATION DISTRICT
Jyii&~ .;)Jf .;i. OOS: BOARD MEETING
NAME ORGANIZATION/FIRM
H:IWP.DTA\ADMINIBSIFORMSISIGN-IN FORM.DOC
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Board Secretary prior to commencement of the Board
m~eting. As determined by the Chair, speakers may be deferred until the specific item is taken for
discussion. Remarks may be limited to three minutes or less. Any handouts 3 COPIES
REQUIRED) must be given to the Board Secretary prior to the meeting fo aistribut1
DATE: AGENDA ITE
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
NAME: (please print)
HOME ADDRESS:
(number/street)
N l vdfdll /?&Ai~l q; 6td
(city/zip code)
TELEPHONE: ( q l/ fl ) lt ~ ~,--(! ()] <(
REPRESENTING: J/[ :12 . £&Ji)/ C{)l..J tJV{A-9 I(
(self/name of organization)
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Board Secretary prior to commencement of the Board
meeting. As determined by the Chair, speakers may be deferred until the specific item is taken for
discussion. Remarks may be limited to three minutes or less. Any handouts (35 COPIES
REQUIRED) must be given to the Board Secretary prior to the meeting fo · · tion.
DATE:
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
NAME: (please print)
HOME ADDRESS:
(number/street)
!+rs
(city/zip code)
TELEPHONE: ( 7r~_~_(_)_--~-( ~_(}_ _____ _
REPRESENTING: ~N-r (self/name of organization)
m e y e r s I n a v e riback silver & wilson
p r of es s ion a I I aw c or p or at i .on
July 26, 2005
Brad Hogan, Esq.
Woodruff, Spradlin & Smart
701 South Parker Street
Orange, CA 92868
Re: Hydrogen Peroxide Litigation
Dear Brad:
Geoffrey Spellberg
Attorney at Law
415.421.3711
At your request I am writing with information about the Hydrogen Peroxide Antitrust Litigation. As
you may recall, we have already brought suit in this action on behalf of Central Marin Sanitation
Agency and on behalf of the City of Stockton. The primary action is currently venued in the
Eastern District of Pennsylvania (Philadelphia). That lawsuit involves claims from all direct
purchasers who purchased the product directly from the manufacturers who engaged in the price
fixing activity. (In contrast, the action brought on behalf of the City of Stockton involves indirect
purchaser claims where the plaintiffs purchased Hydrogen Peroxide from distributors who obtained
the product from the price fixing defendants.)
As I recall, Orange County is a direct purchaser and so is entitled to participate in the direct
purchaser action in Philadelphia. That action is brought under the Sherman Act which permits
parties damaged by illegal price fixing to recover treble the actual damages suffered. Thus, for
example, if the price fixing scheme increased prices 30% and Orange County purchased$ 3
million worth of product since 1995 (the relevant period) it would be entitled to damages of
$900,000 which would then be trebled to $2.7 million.
We are requesting that Orange County join and participate in litigation against the various
Hydrogen Peroxide manufacturers. The basis for this request and the key facts are as follows:
• It has been established through criminal actions in Europe and grand jury
investigations in California that a significant number of Hydrogen Peroxide manufacturers have
been involved in an illegal cartel and for years have been fixing the price of Hydrogen Peroxide at
an artificially high level. Thus, our ability to establish antitrust liability here is extremely high.
• Orange County has purchased the product for a number of years and appears to
have paid excessive amounts as a result of the illegal price fixing. As a result, the County is
entitled to recover a potentially significant sum from these manufacturers. As mentioned, under the
Sherman Act, the potential recovery is substantial.
50 California Street, Suite 3050 I San Francisco, California 94111 I tel 415.421.3711 I fax 415.421.3767 I www.meyersnave.com
0 A K L A N a • s Ar~ L E A rm R 0 • s MJT A R 0 s A • s A c R A M ErH 0 • s A N F R A N c I s c 0 • L 0 s Ar~ G E L E s
• There is not and never will be any cost to Orange County as a result of its
participation in the. litigation. Even with the venue located in Philadelphia, all costs will be borne by
the attorneys" We will execute a retainer agreement which states that the County is not and never
will be responsible for any costs or attorney's fees in the case. In the unlikely event the action is
unsuccessful and costs or fees are awarded to the manufacturers, we, as your attorneys, will agree
to pay such costs or fees.
• The County will receive the full recovery obtained. None of the costs or attorney's
fees in the case will come from the County's recovery. All fees and costs would be awarded by the
Court and those amounts are separate from the recovery to the County. As an example, if it turns
out the price fixing was 30% and the County becomes entitled to the $2.7 million figure set forth
above, the County would receive that entire amount with no deduction for costs of suit or attorney's
fees.
• This is a no risk proposition to the County. It stands the likelihood of obtaining a
significant cash recovery with a guarantee that there will not be any out of pocket costs, even in the
event of an unsuccessful result. The only burden to the County will be the time spent by County
employees locating and providing Hydrogen Peroxide purchase records and related
correspondence and potentially sitting for deposition.
In summary, we believe that this is a "no lose" prqposition for Orange County. There is the
likelihood of a significant financial recovery with no investment or financial risk. We would be
honored to have the County join this litigation.
I look forward to hearing from you as soon as possible. As we have discussed, we would very
much like to work with Orange County in this matter and would like to go forward with that
representation as soon as possible. For your convenience, we enclose a sample retainer
agreement that we would propose using in this matter.
Very truly yours,
MEYERS, NAVE, RIBACK, SILVER & WILSON
GS:ea
c: Bruce Simon, Esq.
772704_1
/
Hydrogen Peroxide
Fiscal year Vendor This Report by FY Dates
10/1 /94-9/30/95 FMC
10/1 /95-9/30/96 FMC
10/1 /96-6/30/97 FMC
1997-98 Vulcan $ 1,106,313
1998-99 Vulcan $ 992,498
1999-00 Vulcan $ 925,665
2000-01 Vulcan $ 994 •. 604
2001-02 Vulcan $ 1,123,055
2002-03 US Peroxide $ 1,060,926
2003-04 US Peroxide $ 879,498
2004-3/17 /05 US Peroxide $ 706,551
$ 7,789,110
BthTy Batch Number Batch Date
v 690 8/511997
v 690 8/5/1997
v 690 8/5/1997
v 690 8/5/1997
v 945 9/3/1997
v 945 9/3/1997
v 945 9/3/1997
v 945 9/3/1997
v 1400 9/16/1997
v 1400 9/16/1997 v 2528 10/24/1997
v 2528 10/24/1997
v 2528 10/24/1997
v 2528 10/24/1997
v 2528 10/24/1997
v 2528 10/24/1997 v 3015 11/4/1997
v 3015 11/4/1997
v 4372 11/20/1997
v 4372 11/20/1997
Electronic Records
$881,609
$ 855,657
$ 637,931
$ 2,375,197
Document Number
975
975
978
978
2727
2727
2728
2728
3993
3993
5945
5945
5946
5946
5947
5947
6599
6599
7511
7513
Usage
365,250.00
374,300.00
264,283.00
424,800.00
456,000.00
524,400.00
541,200.00
644,400.00
720,000.00
624,000.00
453,000.00 Thru 3/31/05
$ 10,164,307 Total Hydrogen Peroxide Costs 10/1/94-3/17/95
Account Number Amount
830.52032.1 OH 20378.98
840.52032.20H 29634.66
830.52032.10H 32802.03
840.52032.20H 30568.24
830.52032.1 OH 46672.02
840.52032.20H 55473.21 FY1997-98 $ 1, 106,313.11
830.52032.1 OH 49262.78
840.52032.20H 27481.97
830.52032.10H 12970.69
840.52032.20H 22090.47
830.52032.10H 32525.42
840.52032.20H 40107.28
830.52032.10H 13354.69
840.52032.20H 15998.54
830.52032.1 OH 3443
840.52032.20H 12191.33
830.52032.1 OH 6838.69
840.52032.20H 60173.69
840.52032.20H 3260.86
830.52032.10H 6360.7
........ _ ...
'
SETTLEMENT AGREEMENT AND
MUTUAL RELEASE OF ALL CLAIMS
This settlement agreement and mutual release ("Agreement") is effective __ _
_____ · __ ("Effective Date") by and between Kimberly-Clark Worldwide, Inc.
("Kimberly-Clark"), on the one hand, and the Orange County Sanitation District, a duly
organized County Sanitation District, existing pursuant to the County Sanitation District
Act, California Health and Safety Code section 4700, et seq., ("OCSD"), on the other
hand. Kimberly-Clark and the OCSD shall be collectively referred to herein as the
"Parties."
WHEREAS, the Board of Directors of OCSD previously adopted Ordinance
No. 24, which established annual "Sanitary Sewer Service Charges for all uses, Capital
Facilities Capacity Charges imposed on new connections or expanded use of existing
connections, miscellaneous industrial discharger fees, source control/non-compliance
sampling fees, and waste hauler charges", and became effective January 1, 2005; and
WHEREAS, Kimberly-Clark made a request to OCSD pursuant to the California
Public Records Act for records pertaining to its adoption of Ordinance No. 24 and
received a substantial number of records in response to the request; and
WHEREAS, the Parties previously agreed to toll any applicable lJnexpired
limitations period governing Kimberly-Clark's ability to challenge Ordinance No. 24 for a
period of 60 days, until June 29, 2005; to toll any such limitations period another 30
days, until July 29, 2005; and to further toll any such limitations period as required to
complete this Agreement;
WHEREAS, OCSD subsequently adopted Ordinance No. 26, which repealed
Ordinance No. 24 and reenacted sewer service charges and capital facilities fees
established by Ordinance No. 24, as well as provided for increases in certain
miscellaneous charges and fees, effective July 1, 2005; and
WHEREAS, OCSD is willing to undertake an independent review of the
appropriateness of the charges and fees established by Ordinance No. 24 and
subsequently reenacted by Ordinance No. 26 ("Ordinances"), and the Parties desire to
avoid the cost and burdens attendant with litigation over the validity of such charges and
fees; and
WHEREAS, the Board of Directors of OCSD approved settlement of Kimberly
Clark's claims as set forth in this Settlement Agreement at its meeting on ____ _
I of
NOW, THEREFORE, in consideration of the mutual covenants and conditions
hereinafter set forth and for other good and valuable consideration, the receipt and
sufficiency of which are hereby acknowledged, the Parties hereto agree as follows:
1. INDEPENDENT REVIEW.
A. RETENTION OF CONSUL TANT. OCSD shall, at its sole cost, retain
an independent professional consultant or consulting firm recognized as having
expertise in utility rate setting practices ("Consultant") to review the changes to
the fees and charges imposed by OCSD, which resulted from its adoption of the
Ordinances, and to make recommendations to OCSD regarding said fees and
charges. The Consultant shall be a qualified and impartial professional, well-
versed in cost-of-service issues confronting county or municipal sanitation
districts. The recommendations shall be based upon applicable legal and
regulatory standards and shall specifically address:
(a) the appropriate allocation of costs between maintaining facilities to
serve existing load on the one hand and expansion of facilities to provide
additional capacity on the other hand;
(b) the extent to which the amount of the costs of providing the service,
and the allocation among fee payers, is adequately based on appropriate
cost of service principles and applicable legal standards;
(c) the appropriate allocation of costs between and among pollutants (e.g.,
Suspended Solids ("SS"), Biochemical Oxygen Demand ("BOD")) and
volume, including the basis for allocation of non-assignable costs;
(d) the appropriate amount of charges, and the allocation of those charges
among fee payers, for the added costs of providing (i) full secondary
treatment and (ii) the ground water replenishment system.
The review may also include other matters as determined by OCSD. OCSD shall
make available to the Consultant all information that is not privileged that was
used by OCSD to develop the fee ordinance, including but not limited to
personnel, records, or other information necessary for Consultant to complete the
review. The Consultant shall conduct at least two "interested party" meetings to
take input prior to the submission of Consultant's draft written report.
B. DRAFT AND FINAL REPORT Upon completion of the review, the
Consultant shall prepare a draft written report ("Draft Report"), and in said Draft
Report, Consultant shall recommend not less than two or more than five
alternative rate structures. The Draft Report shall be completed no later than
February 1, 2006. OCSD shall make the Draft Report available to the public, and
shall keep the public apprised as to the progress of said Draft Report. The
OCSD shall accept comments on the Draft Report from any interested person for
2 of
a period of a minimum of sixty (60) days. The Consultant will consider any and all
public comments received within the sixty (60) day period. The Consultant will
prepare a Final Report based on its independent judgment, which shall be
submitted to the Board of Directors of OCSD ("the Board") no later than April 1,
2006 for consideration at the regularly scheduled May, 2006 meeting of the
Board. The Board shall consider the Final Report prior to modifying or readopting
its ordinance then in effect governing the fees and charges that are the subject of
the Final Report. The Board, however, shall use its independent judgment in
setting fees and charges, and is not bound by the recommendations or
conclusions of the Final Report; however, in issuing its decision, the Board shall
set forth its specific findings in support of its decision to adopt or refuse to adopt
the Consultant's recommendations. The Board, to the extent feasible, shall issue
its decision within eight (8) months of execution of this Agreement by both
Parties.
2. EXTENDED PAYMENT TERMS FOR FY 2005-06 FEE INCREASES.
The Parties recognize that the Ordinances each result in substantial fee increases on
certain classes of OCSD permittees, including Kimberly-Clark. To mitigate the hardship
to Kimberly-Clark from such increases, the Parties agree to extended payment terms,
as follows:
A. BASE FEES. To the extent that the charges and fees imposed by
the Ordinances on Kimberly-Clark for services provided during FY 2005-06 equal
fees paid by Kimberly-Clark to OCSD during the FY 2004-05 base year, such
fees shall be due and payable according to the ordinary terms and conditions of
service as provided by OCSD.
B. INCREASED FEES. To the extent that the charges and fees
imposed by the Ordinances on Kimberly-Clark for services provided during FY
2005-06 exceed fees paid by Kimberly-Clark during the FY 2004-05 base year, at
the option of Kimberly-Clark, the increase amount above the base fees shall be
due and payable according to the ordinary terms and conditions of service as
provided by OCSD or in eight (8) approximately equal quarterly installments
beginning September 30, 2005. In the event that Kimberly-Clark elects to pay
the increase amount in quarterly installments, interest shall accrue on the unpaid
balance of the increase amount, compounded daily, at an annual rate of five
percent (5%).
3. COOPERATIVE EFFORTS TO REDUCE FLOW. BOD AND TSS. The
Parties recognize the value of mutual cooperation to reduce the Flow, BOD and SS in
Kimberly-Clark discharge. To that end, OCSD agrees to review and comment upon any
proposed facility modifications that Kimberly-Clark may present that are designed to
reduce the Flow, BOD and SS in Kimberly-Clark discharge. The Parties acknowledge
that such review and comment by OCSD is not guaranteed to meet Kimberly-Clark's
objectives and will not result in the waiver or reduction of any applicable OCSD
standards or requirements.
3 of
;
4. MUTUAL RELEASE. This is a full and final release of any and all claims
arising out of, or in any way connected with, the adoption of the Ordinances by OCSD
as set forth in the Recitals to this Agreement. The Parties do hereby release and
forever discharge each other and their respective agents, servants, employees,
insurers, and all other persons, agencies, and entities from all claims, demands,
actions, causes of action and all liability in connection with such actions. The Parties
each agree to waive the provisions of California Civil Code section 1542, which
provides:
"A general release does not extend to claims which the creditor does not
know or suspect to exist in his favor at the time of executing the release,
which if known to him must have materially affected his settlement with the
debtor."
5. NOTICES. Any notice, request, demand, consent, approval or other
communication required or permitted hereunder or by law shall be deemed given or
made only if in writing and deposited in the United States mail, postage prepaid and
addressed to the party for whom intended, addressed as follows, or to such other
address as may, from, time to time, be designated by written notice to the other Parties:
To Kimberly-Clark: Howard Sharfstein
Kimberly-Clark Corporation
1400 Holcomb Bridge Road
Roswell, GA 30076
With a copy to:
To OCSD:
With a copy to:
Jeffrey Leacox, Esq.
Livingston & Mattesich Law Corporation
1201 K Street, Suite 1100
Sacramento, CA 95814-3938
Orange County Sanitation District
Attention: Blake P. Anderson, OCSD General Manager
P.O. Box 8127
Fountain Valley, CA 92728-8127
Bradley R. Hogin, Esq.
Woodruff, Spradlin & Smart
701 South Parker Street, Suite 8000
Orange, CA 92868-4724
6. INTEGRATED AGREEMENT. This Agreement constitutes the entire
understanding between the Parties hereto with respect to the subject matter set forth
herein and supersedes any and all prior or other contemporaneous understandings,
correspondence, negotiations, or agreements, written or oral between them respecting
4of
the within subject matter. No alterations, modifications or interpretations hereof shall be
binding unless in writing and signed by all of the Parties.
7. AMENDMENTS IN WRITING. Any amendments to this Agreement must
be in writing and signed by all of the Parties.
8. INTERPRETATION. This Agreement is the result of negotiations in which
each party was represented by counsel of their own selection. Each of the Parties
hereby waives any provisions of law to the effect that an ambiguity in a contract or
agreement should be interpreted against the Party that drafted ·the contract, agreement
or instrument.
9. GOVERNING LAW. This Contract shall be governed by and construed
according to the laws of California.
10. COUNTERPARTS. This Agreement may be executed in one or more
counterparts, each of which shall be deemed an original but all of which together shall
constitute one and the same agreement.
11. NO ADMISSION OF LIABILITY. This is a compromise settlement of
disputed claims. Neither the execution of this Agreement nor anything contained in it is
intended to be, nor shall be deemed to be, an admission by either party of any liability to
anyone or an admission of the existence of facts upon which liability could be based.
12. ATTORNEY FEES AND COSTS. The Parties shall each bear their
respective costs and attorneys' f~es in the negotiation and drafting of this Agreement.
In the event of litigation or proceedings arising from or in any way relating to this
settlement agreement or any breach or interruption hereof, the prevailing party shall be
entitled to recover its reasonable costs and attorneys' fees, whether such action be at
law or equity.
APPROVED AND AGREED:
"Kimberly-Clark"
KIMBERLY-CLARK WORLDWIDE, INC ..
By:
APPROVED AS TO FORM:
KIMBERLY-CLARK WORLDWIDE, INC ..
5 of
By:
Howard Sharfstein, Esq.
"OCSD"
ORANGE COUNTY SANITATION DISTRICT
By:
Blake P. Anderson
General Manager
APPROVED AS TO FORM:
BRADLEY R. HOGIN
DISTRICT COUNSEL
By:
Bradley R. Hogin, Esq.
c:\documents and settings\brh\local settings\temporary internet files\olk2b\kc ocsd settlement agreement 092805-cln.doc
6 of
September 26, 2005
Board of Directors
Orange County Sanitation District
P.O. Box 8127
Fountain Valley, CA 92728-8127
Subject: Supplemental Capital Facilities Capacity Charge
Dear Board Members,
Jazz would like to thank you and the District Staff for the ti.-
and consideration of the applicability of the s .. -·
Charge (SCFCC) to Newport Fab, LLf' 1-" r
opportunity to address the B"". · .J ~ \_,
Board shortly after tl-l{. \( \ ~
J~ ~0 I ,.._ffi District Staff recomrr, / .
They base their recoffil \\' \\ •
2) Conexant owns the b,
\ V r ~t}-111\\
\
""-' Y .... w v~ ~ ~\d··
the same as under Con. ( \ \ -~
Conexant, 5) no additiom -\R ~
corporate changes that ere'
The District's FAHR Corru
recommendation on; 1) Jazz .
allow transfer of a permit, an,
We would like to reiterate that
LLC (dba Jazz Semiconductor),
when this new permit was issued
new permit was issued. It was onl)
Carlyle Group and contributed Newi.
\(\~
.• ure.
• f'it-J7 SEMICONDUCTOR J u l L lnnom•on ManulacJureo
you invested in evaluation
;apital Facilities Capacity
-). If you recall, I had the
'led is a letter sent to the
issue one more time.
~erniconductor (Jazz).
~al ownership in Jazz,
t connection is
•me as under
1 and, 6) the
iopted.
'\Se their
'oes not
?ab, c,O(f'
@11;0-se(f'' • ~onexant
~a<:<
0,,,1e:O .~"rt Fab when the
.J a joint venture with the
Jazz is not complaining about Operatit. . ..v1aintenance charges. We understand it takes
substantial resources to operate facilines such as the District's. We are questioning
application of an additional fee for "added capacity" when the company that applied for the
permit was the same as held the prior permit and there has been no change in discharge
quantity or quality. I hope you agree this "capacity charge" should not apply to Jazz.
Again, I thank you very much for giving me the opportunity to comment on this important
issue. If you have any questions, please feel free to call me at (949) 435-8342.
Sincerely,
Allen Shiroma
Director, Facilities
Attachment: Letter to OCSD dated February 10, 2003
cc: Robert Ghirelli -OCSD
Carolyn Follis
NabilAIAli
Letter to Board of Directors September 26, 2005
Board of Directors
Orange County Sanitation District
Re: Current management
The Orange County Sanitation District (OCSD) benefits by having visionary
management. The Executive Management Team (EMT) is led by Blake Anderson, a
General Manager (GM) who seeks to maintain world class wastewater treatment while
satisfying the often opposing tenets of pleasing customers and remaining economically
viable.
The GM sets the tone for the organization. OCSD is always striving to utilize
opportunities to learn, to improve, and to gain insight. The organization strives to do the
best job possible, seek improvements, keep the process open and transparent, while
always remembering that the people run the system, not the other way around.
This positive work environment and benefit to the community are possible because the
leadership not only verbally supports this, but management leads by example. During the
first Biosolids EMS external audit, one of the auditor interactions was a meeting with the
GM and some of the EMT. When the audit team walked into the GM's office, Blake
asked me what I was doing there. When the lead auditor introduced me as the public
observer of the audit, Blake immediately recognized the benefits of having public
involvement and not only welcomed the opportunity but supported the endeavor.
Many folks talk the talk, but few walk the walk. This organization is able to sustain the
high level of achievement due to the vision, direction, and leadership of its GM. Ask any
of the EMT. Who sets the tone for the open and communicative style of OCSD? The
EMT supports the tone, makes it a reality, but it is the leadership of Blake Anderson, the
GM, that shows the organization how to perform.
Blake develops relationships with stakeholders and encourages the staff to do the same.
This is not simply lip service but a fully actualized and essential principle of OCSD. We
have all know management that says to do such and such, but does not support the action
espoused. This GM not only supports the staff doing so, but does it himself. The
oversight and questioning of OCSD by stakeholders is viewed as a means to improve
performance. Public contacts are not something to do to check a box on an evaluation
form, but are used to gain other viewpoints and perspectives.
When I am introduced at various meetings at the OCSD, folks always know that I am
there to hold management's feet to the fire. I am there to hold OCSD accountable. Many
times I have asked you, the Board of Directors, to ask in-depth, probing and probative
questions in areas that have come to light, not because the staff sequesters information,
but because OCSD is an open and transparent organization.
How often does an organization truly view public oversight either from elected officials
or the general public as a benefit? OCSD always seeks opportunities to learn, to
1
Letter to Board of Directors September 26, 2005
improve, and to gain insight. This comes from the top of the organization, the GM, Blake
Anderson. This organization exemplifies the management perspective of do the best job
possible, seek improvements, keep the process open, and always remember that the
people, the employees, the workers run the system, not the other way around.
The leader of a quasi-governmental organization that operates as a business could settle
for status quo. Don't rock the boat. Just keep everybody happy, or at least, not angry.
This GM leads the way so OCSD can lead the way. Look at the Biosolids EMS. No one
forced OCSD into the National Biosolids Partnership or into the EMS. OCSD staff saw a
means to improve and went for it. Improvements are being realized because of the
initiative that OCSD has taken. OCSD is setting the standard, training others about the
EMS, remaining open to new and novel ideas, and setting an example for other
wastewater agencies to emulate.
Treating wastewater and finding ways to beneficially reuse the products of the treatment
plants is not glamorous. Motivation often comes from diverse sources. OCSD is
fortunate to have a GM who is open to new ideas, understands that questions and
challenges are opportunities to acquire new perspectives, and instills the best in the
workers and the organization. Things do not always go as everyone wants, but you can
be sure that under its current management, OCSD strives to be the best it can possibly be.
Take care,
~-?~
Randy Fuhrman
Ratepayer
(714) 812-8122
2
··m e Y e r s I n a v e ribock silver & wilson
professional law corporation
July 26, 2005
Brad Hogan, Esq.
Woodruff, Spradlin & Smart
701 South Parker Street
Orange, CA 92868
Re: Hydrogen Peroxide Litigation
Dear Brad:
Geoffrey Spellberg
Attorney at Law
415.421.3711
At your request I am writing with information about the Hydrogen Peroxide Antitrust Litigation. As
you may recall, we have already brought suit in this action on behalf of Central Marin Sanitation
Agency and on behalf of the City of Stockton. The primary action is currently venued in the
Eastern District of Pennsylvania (Philadelphia). That lawsuit involves claims from all direct
purchasers who purchased the product directly from the manufacturers who engaged in the price
fixing activity. (In contrast, the action brought on behalf of the City of Stockton involves indirect
purchaser claims where the plaintiffs purchased Hydrogen Peroxide from distributors who obtained
the product from the price fixing defendants.)
As I recall, Orange County is a direct purchaser and so is entitled to participate in the direct
purchaser action in Philadelphia. That action is brought under the Sherman Act which permits
parties damaged by illegal price fixing to recover treble the actual damages suffered. Thus, for
example, if the price fixing scheme increased prices 30% and Orange County purchased$ 3
million worth of product since 1995 (the relevant period) it would be entitled to damages of
$900,000 which would then be trebled to $2.7 million.
We are requesting that Orange County join and participate in litigation against the various
Hydrogen Peroxide manufacturers. The basis for this request and the key facts are as follows:
• It has been established through criminal actions in Europe and grand jury
investigations in California that a significant number of Hydrogen Peroxide manufacturers have
been involved in an illegal cartel and for years have been fixing the price of Hydrogen Peroxide at
an artificially high level. Thus, our ability to establish antitrust liability here is extremely high.
• Orange County has purchased the product for a number of years and appears to
have paid excessive amounts as a result of the illegal price fixing. As a result, the County is
entitled to recover a potentially significant sum from these manufacturers. As mentioned, under the
Sherman Act, the potential recovery is substantial.
50 California Street, Suite 3050 I San Francisco. California 94111 I tel 415.421.3711 I fax 415.421.3767 I www.meyersnave.com
OAKLAND. SAr~ LEAtrnRo. SArJTA ROSA. SACRAMErHO. SMJ FRANCISCO. LOS Ar1JGELF.S
• There is not and never will be any cost to Orange County as a result of its
participation in the. litigation. Even with the venue located in Philadelphia, all costs will be borne by
the attorneys. We will execute a retainer agreement which states that the County is not and never
will be responsible for any costs or attorney's fees in the case. In the unlikely event the action is
unsuccessful and costs or fees are awarded to the manufacturers, we, as your attorneys, will agree
to pay such costs or fees.
• The County will receive the full recovery obtained. None of the costs or attorney's
fees in the case will come from the County's recovery. All fees and costs would be awarded by the
Court and those amounts are separate from the recovery to the County. As an example, if it turns
out the price fixing was 30% and the County becomes entitled to the $2. 7 million figure set forth
above, the County would receive that entire amount with no deduction for costs of suit or attorney's
fees.
• This is a no risk proposition to the County. It stands the likelihood of obtaining a
significant cash recovery with a guarantee that there will not be any out of pocket costs, even in the
event of an unsuccessful result. The only burden to the County will be the time spent by County
employees locating and providing Hydrogen Peroxide purchase records and related
correspondence and potentially sitting for deposition.
In summary, we believe that this is a "no lose" prqposition for Orange County. There is the
likelihood of a significant financial recovery with rio investment or financial risk. We would be
honored to have the County join this litigation.
I look forward to hearing from you as soon as possible. As we have discussed, we would very
much like to work with Orange County in this matter and would like to go forward with that
representation as soon as possible. For your convenience, we enclose a sample retainer
agreement that we would propose using in this matter.
Very truly yours,
GS:ea
c: Bruce Simon, Esq.
772704_1
Hydrogen Peroxide
Fiscal year Vendor This Report by FY Dates
10/1 /94-9/30/95 FMC
10/1 /95-9/30/96 FMC
10/1 /96-6/30/97 FMC
1997-98 Vulcan $ 1,106,313
1998-99 Vulcan $ 992,498
1999-00 Vulcan $ 925,665
2000-01 Vulcan $ 994,604
2001-02 Vulcan $ 1,123,055
2002-03 US Peroxide $ 1,060,926
2003-04 US Peroxide $ 879,498
2004-3/17 /05 US Peroxide $ 706,551
$ 7,789,110
Bth Ty Batch Number Batch Date v 690 8/5/1997 v 690 8/5/1997 v 690 8/5/1997 v 690 8/5/1997 v 945 9/3/1997 v 945 9/3/1997
v 945 9/3/1997 v 945 9/3/1997 v 1400 9/16/1997 v 1400 9/16/1997 v 2528 10/24/1997 v 2528 10/24/1997 v 2528 10/24/1997 v 2528 10/24/1997 v 2528 10/24/1997 v 2528 10/24/1997 v 3015 11/4/1997 v 3015 1114/1997 v 4372 11/20/1997 v 4372 11/20/1997
'1.\
Electronic Records
$881,609
$ 855,657
$ 637,931
$ 2,375,197
Document Number
975
975
978
978
2727
2727
2728
2728
3993
3993
5945
5945
5946
5946
5947
5947
6599
6599
7511
7513
Usage
365,250.00
374,300.00
264,283.00
424,800.00
456,000.00
524,400.00
541,200.00
644,400.00
720,000.00
624,000.00
453,000.00 Thru 3/31105
$ 10,164,307 Total Hydrogen Peroxide Costs 10/1/94 -3/17/95
Account Number Amount
830.52032.1 OH 20378.98
840.52032.20H 29634.66
830.52032.1 OH 32802.03
840.52032.20H 30568.24
830.52032.1 OH 46672.02
840.52032.20H 55473.21 FY1997-98 $ 1, 106,313.11
830.52032.1 OH 49262.78
840.52032.20H 27481.97
830.52032.1 OH 12970.69
840.52032.20H 22090.47
830.52032.1 OH 32525.42
840.52032.20H 40107.28
830.52032.1 OH 13354.69
840.52032.20H 15998.54
830.52032.10H 3443
840.52032.20H 12191.33
830.52032.1 OH 6838.69
840.52032.20H 60173.69
840.52032.20H 3260.86
830.52032.1 OH 6360.7
SETTLEMENT AGREEMENT AND
MUTUAL RELEASE OF ALL CLAIMS
This settlement agreement and mutual release ("AgreemenO is effective __ _
_______ ("Effective Date") by and between Kimberly-Clark Worldwide, Inc.
("Kimberly-Clark"), on the one hand, and the Orange County Sanitation District, a duly
organized County Sanitation District, existing pursuant to the County Sanitation District
Act, California Health and Safety Code section 4700, et seq., ("OCSD"), on the other
hand. Kimberly-Clark and the OCSD shall be collectively referred to herein as the
"Parties."
WHEREAS, the Board of Directors of OCSD previously adopted Ordinance
No. 24, which established annual "Sanitary Sewer Service Charges for all uses, Capital
Facilities Capacity Charges imposed on new connections or expanded use of existing
connections, miscellaneous industrial discharger fees, source control/non-compliance
sampling fees, and waste hauler charges", and became effective January 1, 2005; and
WHEREAS, Kimberly-Clark made a request to OCSD pursuant to the California
Public Records Act for records pertaining to its adoption of Ordinance No. 24 and
received a substantial n·umber of records in response to the request; and
WHEREAS, the Parties previously agreed to toll any applicable unexpired
limitations period governing Kimberly-Clark's ability to challenge Ordinance No. 24 for a
period of 60 days, until June 29, 2005; to toll any such limitations period another 30
days, until July 29, 2005; and to further toll any such limitations period as required to
complete this Agreement;
WHEREAS, OCSD subsequently adopted Ordinance No. 26, which repealed
Ordinance No. 24 and reenacted sewer service charges and capital facilities fees
established by Ordinance No. 24, as well as provided for increases in certain
miscellaneous charges and fees, effective July 1, 2005; and
WHEREAS, OCSD is willing to undertake an independent review of the
appropriateness of the charges and fees established by Ordinance No. 24 and
subsequently reenacted by Ordinance No. 26 ("Ordinances"), and the Parties desire to
avoid the cost and burdens attendant with litigation over the validity of such charges and
fees; and
WHEREAS, the Board of Directors of OCSD approved settlement of Kimberly
Clark's claims as set forth in this Settlement Agreement at its meeting on ____ _
I of
NOW, THEREFORE, in consideration of the mutual covenants and conditions
hereinafter set forth and for other good and valuable consideration, the receipt and
sufficiency of which are hereby acknowledged, the Parties hereto agree as follows:
1. INDEPENDENT REVIEW.
A. RETENTION OF CONSUL TANT. OCSD shall, at its sole cost, retain
an independent professional consultant or consulting firm recognized as having
expertise in utility rate setting practices ("Consultant") to review the changes to
the fees and charges imposed by OCSD, which resulted from its adoption of the
Ordinances, and to make recommendations to OCSD regarding said fees and
charges. The Consultant shall be a qualified and impartial professional, well-
versed in cost-of-service issues confronting county or municipal sanitation
districts. The recommendations shall be based upon applicable legal and
regulatory standards and shall specifically address:
(a) the appropriate allocation of costs between maintaining facilities to
serve existing load on the one hand and expansion of facilities to provide
additional capacity on the other hand;
(b) the extent to which the amount of the costs of providing the service,
and the allocation among fee payers, is adequately based on appropriate
cost of service principles and applicable legal standards;
(c) the appropriate allocation of costs between and among pollutants (e.g.,
Suspended Solids ("SS"), Biochemical Oxygen Demand ("BOD")) and
volume, including the basis for allocation of non-assignable costs;
(d) the appropriate amount of charges, and the allocation of those charges
among fee payers, for the added costs of providing (i) full secondary
treatment and (ii) the ground water replenishment system.
The review may also include other matters as determined by OCSD. OCSD shall
make available to the Consultant all information that is not privileged that was
used by OCSD to develop the fee ordinance, including but not limited to
personnel, records, or other information necessary for Consultant to complete the
review. The Consultant shall conduct at least two "interested party" meetings to
take input prior to the submission of Consultant's draft written report.
B. DRAFT AND FINAL REPORT Upon completion of the review, the
Consultant shall prepare a draft written report ("Draft Report"), and in said Draft
Report, Consultant shall recommend not less than two or more than five
alternative rate structures. The Draft Report shall be completed no later than
February 1, 2006. OCSD shall make the Draft Report available to the public, and
shall keep the public apprised as to the progress of said Draft Report. The
OCSD shall accept comments on the Draft Report from any interested person for
2 of
...
a period of a minimum of sixty (60) days. The Consultant will consider any and all
public comments received within the sixty (60) day period. The Consultant will
prepare a Final Report based on its independent judgment, which shall be
submitted to the Board of Directors of OCSD (11the Board") no later than April 1,
2006 for consideration at the regularly scheduled May, 2006 meeting of the
Board. The Board shall consider the Final Report prior to modifying or readopting
its ordinance then in effect governing the fees and charges that are the subject of
the Final Report. The Board, however, shall use its independent judgment in
setting fees and charges, and is not bound by the recommendations or
conclusions of the Final Report; however, in issuing its decision, the Board shall
set forth its specific findings in support of its decision to adopt or refuse to adopt
the Consultant's recommendations. The Board, to the extent feasible, shall issue
its decision within eight (8) months of execution of this Agreement by both
Parties.
2. EXTENDED PAYMENT TERMS FOR FY 2005-06 FEE INCREASES.
The Parties recognize that the Ordinances each result in substantial fee increases on
certain classes of OCSD permittees, including Kimberly-Clark. To mitigate the hardship
to Kimberly-Clark from such increases, the Parties agree to extended payment terms,
as follows:
A. BASE FEES. To the extent that the charges and fees imposed by
the Ordinances on Kimberly-Clark for services provided during FY 2005-06 equal
fees paid by Kimberly-Clark to OCSD during the FY 2004-05 base year, such
fees shall be due and payable according to the ordinary terms and conditions of
service as provided by OCSD.
B. INCREASED FEES. To the extent that the charges and fees
imposed by the Ordinances on Kimberly-Clark for services provided during FY
2005-06 exceed fees paid by Kimberly-Clark during the FY 2004-05 base year, at
the option of Kimberly-Clark, the increase amount above the base fees shall be
due and payable according to the ordinary terms and conditions of service as
provided by OCSD or in eight (8) approximately equal quarterly installments
beginning September 30, 2005. In the event that Kimberly-Clark elects to pay
the increase amount in quarterly installments, interest shall accrue on the unpaid
balance of the increase amount, compounded daily, at an annual rate of five
percent (5%).
3. COOPERATIVE EFFORTS TO REDUCE FLOW. BOD AND TSS. The
Parties recognize the value of mutual cooperation to reduce the Flow, BOD and SS in
Kimberly-Clark discharge. To that end, OCSD agrees to review and comment upon any
proposed facility modifications that Kimberly-Clark may present that are designed to
reduce the Flow, BOD and SS in Kimberly-Clark discharge. The Parties acknowledge
that such review and comment by OCSD is not guaranteed to meet Kimberly-Clark's
objectives and will not result in the waiver or reduction of any applicable OCSD
standards or requirements.
3 of
4. MUTUAL RELEASE. This is a full and final release of any and all claims
arising out of, or in any way connected with, the adoption of the Ordinances by OCSD
as set forth in the Recitals to this Agreement. The Parties do hereby release and
forever discharge each other and their respective agents, servants, employees,
insurers, and all other persons, agencies, and entities from all claims, demands,
actions, causes of action and all liability in connection with such actions. The Parties
each agree to waive the provisions of California Civil Code section 1542, which
provides:
"A general release does not extend to claims which the creditor does not
know or suspect to exist in his favor at the time of executing the release,
which if known to him must have materially affected his settlement with the
debtor."
5. . NOTICES. Any notice, request, demand, consent, approval or other
communication required or permitted hereunder or by law shall be deemed given or
made only if in writing and deposited in the United States mail, postage prepaid and
addressed to the party for whom intended, addressed as follows, or to such other
address as may, from, time to time, be designated by written notice to the other Parties:
To Kimberly-Clark: Howard Sharfstein
Kimberly-Clark Corporation
1400 Holcomb Bridge Road
Roswell, GA 30076
With a copy to:
To OCSD:
With a copy to:
Jeffrey Leacox, Esq.
Livingston & Mattesich Law Corporation
1201 K Street, Suite 1100
Sacramento, CA 95814-3938
Orange County Sanitation District
Attention: Blake P. Anderson, OCSD General Manager
P.O. Box 8127
Fountain Valley, CA 92728-8127
Bradley R. Hagin, Esq.
Woodruff, Spradlin & Smart
701 South Parker Street, Suite 8000
Orange, CA 92868-4724
6. INTEGRATED AGREEMENT. This Agreement constitutes the entire
understanding between the Parties hereto with respect to the subject matter set forth
herein and supersedes any and all prior or other contemporaneous understandings,
correspondence, negotiations, or agreements, written or oral between them respecting
4of
the within subject matter. No alterations, modifications or interpretations hereof shall be
binding unless in writing and signed by all of the Parties.
7. AMENDMENTS IN WRITING. Any amendments to this Agreement must
be in writing and signed by all of the Parties.
8. INTERPRETATION. This Agreement is the result of negotiations in which
each party was represented by counsel of their own selection. Each of the Parties
hereby waives any provisions of law to the effect that an ambiguity in a contract or
agreement should be interpreted against the Party that drafted the contract, agreement
or instrument.
9. GOVERNING LAW. This Contract shall be governed by and construed
according to the laws of California.
10. COUNTERPARTS. This Agreement may be executed in one or more
counterparts, each of which shall be deemed an original but all of which together shall
constitute one and the same agreement.
11. NO ADMISSION OF LIABILITY. This is a compromise settlement of
disputed claims. Neither the execution of this Agreement nor anything contained in it is
intended to be, nor shall be deemed to be, an admission by either party of any liability to
anyone or an admission of the existence of facts upon which liability could be based.
12. ATTORNEY FEES AND COSTS. The Parties shall each bear their
respective costs and attorneys' fees in the negotiation and drafting of this Agreement.
In the event of litig.ation or proceedings arising from or in any way relating to this
settlement agreement or any breach or interruption hereof, the prevailing party shall be
entitled to recover its reasonable costs and attorneys' fees, whether such action be at
law or equity.
APPROVED AND AGREED:
"Kimberly-Clark"
KIMBERLY-CLARK WORLDWIDE, INC ..
By:
APPROVED AS TO FORM:
KIMBERLY-CLARK WORLDWIDE, INC ..
5 of
By:
Howard Sharfstein, Esq.
110CSD"
ORANGE COUNTY SANITATION DISTRICT
By:
Blake P. Anderson
General Manager
APPROVED AS TO FORM:
BRADLEY R. HOGIN
DISTRICT COUNSEL
By:
Bradley R. Hagin, Esq.
c:\documents and settings\brh\local settings\temporary internet files\olk2b\kc ocsd settlement agreement 092805-cln.doc
6 of
November29,2004
Board of Directors
Orange County Sanitation District
P.O. Box 8127
Fountain Valley, CA 92728-8127
Subject: Supplemental Capital Facilities Capacity Charge
Dear Board Members,
I would like thank you very much for giving me the opportunity to make public comment during
your Board Meeting on October 27. I am writing to elaborate on what Newport Fab, LLC (dba
Jazz Semiconductor) believes is an improper application of the Supplemental Capital Facilities
Capacity Charge (SCFCC) to our facility in Newport Beach. We have addressed this issue with
District Staff, but feel it is significant enough to address with you.
The semiconductor fabrication facility we occupy in Newport Beach has operated at this location
for many years, most recently as part of Conexant Systems, Inc. and before that as part of
Rockwell International Semiconductor Systems. Newport Fab, LLC was contributed by
Conexant as part of a joint venture with The Carlyle Group. Newport Fab became a stand-alone
company in March 2002 with the Carlyle Group becoming the primary shareholder and Conexant
retaining minority interest. The transaction involved the acquisition of manufacturing equipment
and technology, as well as the transition of 636 employees from Conexant to Newport Fab. It did
not result in the creation of new facilities or the expansion of existing facilities. The Newport
Fab manufacturing operation is identical in terms of discharge wastewater quantity and quality as
it was under Conexant Systems.
Even though their were no changes in use of the site or discharge water quantity and quality, the
new legal structure under which the site is operating resulted in a decision by the Orange County
Sanitation District (OCSD) to apply the SCFCC to the Newport Fab facility. Our understanding
is that the SCFCC is intended to support the construction of new facilities required to
accommodate wastewater discharges from either; 1) new facilities, or 2) expansion of existing
facilities. The change in legal structure clearly does not fit these criteria. Just to be clear, the
transition away from Conexant did not result in any new connections being made nor did it result
in any increase in wastewater discharge. In this instance, application of the SCFCC does not
appear to be consistent with the spirit of the Ordinance. Conexant Systems was never required to
pay this fee, regardless of their discharge quantity, while the same manufacturing operation, now
separated from Conexant, is required to pay the fee. The only thing that has changed is the name
of the operation.
-.
The SCFCC payments for Newport Fab were:
OCSD Q4 2001/2002 -
OCSD 2002/2003 -
OCSD 2003/2004 -
OCSD 2004/2005 -
$ 50,017 at $570/mg
$138,351 at $570/mg
$140,508 at $570/mg
$246,000 forecast at $1,00 I/mg
It is difficult to understand how a change in ownership, with no change in wastewater discharge, can
trigger an additional payment now reaching $246,000 per year. In three years, Newport Fab will
have paid out nearly $600,000 in SCFCC fees for essentially carrying out the same operation and
activity as was done under Conexant, its predecessor company. This amount is in addition to our
Operating and Maintenance charge. Again, Conexant Systems never paid this fee even though their
discharge was identical and we are using the same sewer connection.
The Carlyle Group invested in a manufacturing operation whose future was in doubt due to business
pressures. The discontinuation of this operation, if it occurred, would have resulted in the loss of
over 600 jobs to Newport Beach and Orange County. It is actions such as this, what we view to be
the arbitrary and capricious application of the SCFCC simply due to a change in ownership and not
because of additional wastewater discharge, that send a strong negative signal to business thinking
of coming to California or trying to stay committed to operating in this state.
Comment was made during the recently held Board of Directors meeting that application of the
SCFCC is similar to someone who purchases an existing home and must pay higher property tax. It
was also stated during the October F AHR meeting that while businesses have seen a 15% increase
in Operating and Maintenance charges, residences have seen the same increases.
I remind the Board that businesses pay Operating and Maintenance charges like residences, and we
are seeing the same rate increases. We are not questioning the increases in our 0 & M charges. In
addition, we also pay property taxes. What Newport Fab is questioning is the application of a third
fee that residences do not have to pay. A fee that is for "added capacity" even though our
wastewater discharge is not changing. The SCFCC is 130% higher than the O&M fee, which more
than doubles the annual payments to the OCSD.
We feel application of the SCFCC to Newport Fab is akin to a new homeowner having to pay an
annual capacity charge in addition to their existing fees and taxes. This even though they are
purchasing an existing home and the wastewater discharge to the OCSD is not changing.
I hope you agree this "capacity charge" should not apply to Newport Fab, just as it should not apply
to an existing home that changes hands, since there is no increase in wastewater discharge nor is
there a new sewer connection.
Again, I thank you very much for giving me the opportunity to comment on this important issue. If
you have any questions, please feel free to call me at (949) 435-8342.
Sincerely,
Allen Shiroma
Director, Facilities
Attachment: Letter to OCSD dated February 10, 2003
cc: Gary Streed -OCSD
Mark Becker
Carolyn Follis
Eric Moschet
Scott Silcock
Letter to Board of Directors September 26, 2005
-~
A Board of Directors
Orange County Sanitation District
Re: Current management
The Orange County Sanitation District (OCSD) benefits by having visionary
management. The Executive Management Team (EMT) is led by Blake Anderson, a
General Manager (GM) who seeks to maintain world class wastewater treatment while
satisfying the often opposing tenets of pleasing customers and remaining economically
viable.
The GM sets the tone for the organization. OCSD is always striving to utilize
opportunities to learn, to improve, and to gain insight. The organization strives to do the
best job possible, seek improvements, keep the process open and transparent, while
always remembering that the people run the system, not the other way around.
This positive work environment and benefit to the community are possible because the
leadership not only verbally supports this, but management leads by example. During the
first Biosolids EMS external audit, one of the auditor interactions was a meeting with the
GM and some of the EMT. When the audit team walked into the GM's office, Blake
asked me what I was doing there. When the lead auditor introduced me as the public
observer of the audit, Blake immediately recognized the benefits of having public
involvement and not only welcomed the opportunity but supported the endeavor.
Many folks talk the talk, but few walk the walk. This organization is able to sustain the
high level of achievement due to the vision, direction, and leadership of its GM. Ask any
of the EMT. Who sets the tone for the open and communicative style of OCSD? The
EMT supports the tone, makes it a reality, but it is the leadership of Blake Anderson, the
GM, that shows the organization how to perform.
Blake develops relationships with stakeholders and encourages the staff to do the same.
This is not simply lip service but a fully actualized and essential principle of OCSD. We
have all know management that says to do such and such, but does not support the action
espoused. This GM not only supports the staff doing so, but does it himself. The
oversight and questioning of OCSD by stakeholders is viewed as a means to improve
performance. Public contacts are not something to do to check a box on an evaluation
form, but are used to gain other viewpoints and perspectives.
When I am introduced at various meetings at the OCSD, folks always know that I am
there to hold management's feet to the fire. I am there to hold OCSD accountable. Many
times I have asked you, the Board of Directors, to ask in-depth, probing and probative
questions in areas that have come to light, not because the staff sequesters information,
but because OCSD is an open and transparent organization.
How often does an organization truly view public oversight either from elected officials
or the general public as a benefit? OCSD always seeks opportunities to learn, to
1
...
Letter to Board of Directors September 26, 2005
improve, and to gain insight. This comes from the top of the organization, the GM, Blake
Anderson. This organization exemplifies the management perspective of do the best job
possible, seek improvements, keep the process open, and always remembers that the
people, the employees, the workers run the system, not the other way around.
The leader of a quasi-governmental organization that operates as a business could settle
for status quo. Don't rock the boat. Just keep everybody happy, or at least, not angry.
This GM leads the way so OCSD can lead the way. Look at the Biosolids EMS. No one
forced OCSD into the National Biosolids Partnership or into the EMS. OCSD staff saw a
means to improve and went for it. Improvements are being realized because of the
initiative that OCSD has taken. OCSD is setting the standard, training others about the
EMS, remaining open to new and novel ideas, and setting an example for other
wastewater agencies to emulate.
Treating wastewater and finding ways to beneficially reuse the products of the treatment
plants is not glamorous. Motivation often comes from diverse sources. OCSD is
fortunate to have a GM who is open to new ideas, understands that questions and
challenges are opportunities to acquire new perspectives, and instills the best in the
workers and the organization. Things do not always go as everyone wants, but you can
be sure that under its current management, OCSD strives to be the best it can possibly be.
Take care,
[Original signed by]
Randy Fuhrman
Ratepayer
(714) 812-8122
2
STATE OF CALIFORNIA}
} SS.
COUNTY OF ORANGE }
Pursuant to California Government Code Section 54954.2, I hereby certify that
the Notice and Agenda 'J'r t~e Regular Board Meeting of Orange County Sanitation
District to be held on 01[{£;:!~ ~r , 2005, was duly posted for public inspection
in the main lobby of the
1
Districts' offices on x/;i-fl4~ .. (!;:,,, 2005.
MIN WITNESS WHEREOF, I have hereunto set my hand this .:;~..)day of
~ .!. ,2005.
Penny M. K , Secret ry
Board of Directors
Orange County Sanitation District
H :\DEPT\ADMI N\BS\FORMS\AGENDA CERTIFICATION. DOC
•, -:1 AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
September 28, 2005 -7:00 P.M.
Agenda Posting: In accordance with the requirements of California Government Code Section 54954.2, this
agenda has been posted in the main lobby of the District's Administrative offices not less than 72 hours prior
to the meeting date and time above. All written materials relating to each agenda item are available for public
inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to the Board
for discussion and/or action, it will be done in compliance with Section 54954.2(b) as an emergency item or
because there is a need to take immediate action, which need came to the attention of the Board subsequent
to the posting of agenda, or as set forth on a supplemental agenda posted in the manner as above, not less
than 72 hours prior to the meeting date.
Public Comments: Any member of the public may address the Board of Directors on specific agenda items or
matters of general interest. As determined by the Chair, speakers may be deferred until the specific item is
taken for discussion and remarks may be limited to three minutes.
Matters of interest addressed by a member of the public and not listed on this agenda cannot have action
taken by the Board of Directors except as authorized by Section 54954.2(b). If you wish to speak, please
complete a Speaker's Form (located at the table outside of the Board Room) and give it to the Board
Secretary.
Consent Calendar: All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the Consent Calendar by a
Director, staff member or member of the public in attendance, there will be no separate discussion of these
items. All items on the Consent Calendar will be enacted by one action approving all motions, and casting a
unanimous ballot for resolutions included on the consent calendar. All items removed from the Consent
Calendar shall be considered in the regular order of business.
Members of the public who wish to remove an item from the Consent Calendar shall, upon recognition by the
Chair, state their name, address and designate by number the item to be removed from the Consent
Calendar.
The Chair will determine if any items are to be deleted from the Consent Calendar.
Items Continued: Items may be continued from this meeting without further notice to a Committee or Board
meeting held within five (5) days of this meeting per Government Code Section 54954.2(b)(3).
Meeting Adjournment: This meeting may be adjourned to a later time and items of business from this agenda
may be considered at the later meeting by Order of Adjournment and Notice in accordance with Government
Code Section 54955 (posted within 24 hours).
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible. If you
require any special disability related accommodations, please contact the Orange County Sanitation District
Board Secretary's office at (714) 593-7130 at least 72 hours prior to the scheduled meeting. Requests must
specify the nature of the disability and the type of accommodation requested.
\ ,.,
1. Invocation and Pledge of Allegiance
2. Roll Call
09/28/05
Page 2
3. Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, if any.
1. Appointment of Chair pro tern, if necessary
5. Public Comments
6. The Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors.
a. Report of Chair; consideration of Resolutions or recommendations, presentations
and awards
b. Report of General Manager
c. Report of General Counsel
7. If no corrections or amendments are made, the minutes for the regular meeting held on
August 24, 2005, will be deemed approved as mailed and be so ordered by the Chair.
8. Ratifying payment of claims of the District, by roll call vote, as follows:
ALL DISTRICTS 08/15/05 08/31 /05
Totals $13,931 , 121 .00 $22,780,465.64
CONSENT CALENDAR
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. No items to be considered
END OF CONSENT CALENDAR
1 O. Consideration of items deleted from Consent Calendar, if any.
.•
09/28/05 -
Page 3
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE
Consent Calendar
a. Order draft Steering Committee Minutes for the meeting held on August 24,
2005, to be filed.
Non-Consent Calendar
b. Review and consideration of agenda items considered by the Steering
Committee re the September 28, 2005 meeting.
c. Consideration of items deleted from Steering Committee Consent Calendar, if
any.
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
Consent Calendar
a. Order draft Operations, Maintenance and Technical Services Committee Minutes
for the meeting held on September 7, 2005, to be filed.
b. Authorize the General Manager to approve Amendment No. 2 to the Power
Purchase Agreement (OF 1098) with Southern California Edison Company,
changing the type of the Plant 2 power generating facility from small power
producer to co-generator facility.
c. Receive and file Biannual Consent Decree Report submitted to the
Environmental Protection Agency and Regional Water Quality Control Board
regarding secondary treatment compliance.
d. (1) Establish an initial budget not to exceed $260,000 annually for the Fats, Oil
and Grease (FOG) screening inspection program of which the District's
proportionate share is estimated at a maximum of $12,000 per year;
(2) Authorize the General Manager to enter into an agreement with the County of
Orange for the provision of the FOG inspection program by the Orange County
Health Care Agency for three years, in a form approved by General Counsel;
and,
(3) Authorize the General Manager to enter into agreements with each
participating Wastewater Discharge Requirement (WDR) Co-Permittee for
inspections in their service areas for three years.
e. Approve Amendment No. 2 to the Consultant Services Agreement with Linjer
Inc., providing for continuing consulting services to manage the completion of the
Collection Facilities O&M Division's Reinvention Project, for an amount not to
exceed $112,000 effective September 27, 2005 through June 30, 2006.
Non-Consent Calendar
09/28/05
Page 4
f. (1) Receive and file Asset Management Plan 2005 Executive Summary prepared
by GHD, LLC and Staff;
(2) Receive and file OCSD Asset Management Improvement Program Overall
Roadmap 2005, prepared by GHD, LLC , dated June 2005; and,
(3) Approve Amendment No. 2 to the Consulting Services Agreement with
GHD, LLC for Asset Management, Job No. SP-68-02, to continue services for a
thirteen-month period from July 1, 2005 to July 31, 2006 for an additional cost of
$550,000, increasing the total amount not to exceed $918,000.
g. Consideration of items deleted from OMTS Consent Calendar, if any.
13. PLANNING, DESIGN AND CONSTRUCTION COMMITIEE (PDC)
PDC Consent Calendar
a. Order draft Planning, Design and Construction Committee Minutes for the
meeting held on September 1, 2005 to be filed.
b. (1) Ratify Change Order No. 2 to HVAC Replacement for Operations Center at
Plant No. 2, Job No. FE02-62, with Bon Air, Inc. authorizing an additional $4,841 ,
increasing the total contract amount to $216,549; and,
(2) Accept HVAC Replacement for Operations Center at Plant No. 2, Job
No. FE02-62, as complete, authorizing the Final Closeout Agreement.
c. Ratify Change Order No. 22 to Primary Clarifiers 16-31 and Related Facilities,
Job No. P1 -37, with Margate Construction, authorizing an addition of $48,078,
increasing the total contract amount to $71 ,756,818.
d. Ratify Change Order No. 5 to Gisler-Redhill Trunk Improvements, Reach "A",
Contract No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-
Redhill/North Trunk Improvements, Contract No. 7-41 ; and City of Tustin Project
Nos. 6106 and 6151 , with ARB, Inc., authorizing an addition of $209,252 and 21
calendar days, increasing the total contract amount to $20, 169,324.
e. Approve Amendment No. 1 to the Professional Services Agreement with Malcolm
Pirnie, Inc. for Primary Treatment Rehabilitation and Refurbishment, Job
No. P2-80, providing for additional engineering services for an additional amount
of $829,984, increasing the total amount not to exceed $6,608,502.
f. Approve Amendment No. 4 to the Professional Services Agreement with Malcolm
Pirnie, Inc. for Rehabilitation of Ellis Avenue Pump Station, Job No. 1-10,
providing for additional design engineering services for an additional amount of
$899,979, increasing the total amount not to exceed $4,799,255.
Non-Consent Calendar
09/28/05
Page 5
g. Approve Amendment No. 6 to the Professional Service Agreement with Tran
Consulting Engineers for additional construction support services for Sunflower
Interceptor Manhole Rehabilitation, Contract No. 7-21, for an additional amount
of $29,600, increasing the total amount not to exceed $614,295.
h. Consideration of items deleted from PDC Consent Calendar, if any.
14. FINANCE, ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHR)
FAHR Consent Calendar
a. Order draft Finance, Administration and Human Resources Committee Minutes
for the meeting held on September 14, 2005 to be filed.
b. Receive and file Treasurer's Report for the month of August 2005.
c. Receive and file report of General Manager approved purchases in amounts
exceeding $50,000 in accordance with Board purchasing policies.
d. Adopt Resolution No. OCSD05-23, amending Resolution No. OCSD 98-33,
amending Human Resources Policies and Procedures Manual.
e. Receive and file SWAP Report for the quarter ended June 30, 2005.
f. Receive and file Quarterly Investment Management Program Report for the
period April 1, 2005 through June 30, 2005.
FAHR Non-Consent Calendar
g. (1 ) Receive and file letter from Newport Fab, LLC dated November 29, 2004,
requesting a transfer of the flow baseline established by Conexant; and,
(2) Deny request to transfer the flow baseline previously established by Conexant
to Newport Fab, LLC.
h. Consideration of items deleted from FAHR Consent Calendar, if any.
15. GWR SYSTEM STEERING COMMITTEE (GWRSSC)
GWRSSC Consent Calendar
a. Order Joint Groundwater Replenishment System Steering Committee Minutes for
the meeting held on August 8, 2005 to be filed.
GWRSSC Non-Consent Calendar
b. Consideration of items deleted from GWRSSC Consent Calendar, if any.
NON-CONSENT CALENDAR
09/28/05
Page 6
16. (1) Approve Plans and Specifications for Bushard Trunk Sewer Rehabilitation Pipe
Procurement, Job No. l-2-4P, on file at the office of the Board Secretary;
(2) Approve Addenda Nos. 1 and 2 to the plans and specifications;
(3) Receive and file bid tabulation and recommendation; and,
(4) Award a Purchase Contract to Ameron International for Bushard Trunk Sewer
Rehabilitation Pipe Procurement, Job No. l-2-4P, for an amount not to exceed
$7,699,777.30.
17. (1) Approve and direct the Board Chair to execute on behalf of the District a Purchase
and Sale Agreement in a form acceptable to General Counsel to acquire the property
located at 7465 Lampson Avenue in Garden Grove for $7,900,000; and,
(2) Approve the use of the acquired property for the North County Yard.
18. (1) Approve Resolution No. OCSD 05-24, Establishing Support for Gulf Coast Disaster
Recovery Efforts Related to Hurricanes Emanating from the Gulf of Mexico that is
Specifically Targeted to Infrastructure Operations Pertaining to the Collection, Treatment
and Disposal of Wastewater and Associated Byproducts as requested through the
Federal Emergency Management Agency (FEMA), the Emergency Management
Information System (EMIS), or other recognized official National Coordination effort;
(2) Authorize the General Manager to enter into individual "Release Time Agreements"
with volunteer employees and their recognized employee organizations (i.e., unions or
employee associations) based on the following terms:
a. A "rotation" of three employees will be released from regular duties at any given
time for up to a maximum of twelve calendar days per rotation;
b. A total of up to four "rotations";
c. Employees shall be paid for up to 80 hours of regular pay during the time they
are away on a twelve day rotation;
d. Up to a total of twelve employees maximum released to participate in the
response and recovery efforts for a total authorization of 960 hours {12
employees x 80 hours) of regular paid time;
e. Cap regular paid time for volunteer employees at an authorized amount not to
exceed $75,000 for this effort; and
(3) Authorize the General Manager to deploy physical assets into the Gulf Coast area to
assist with Disaster Recovery efforts within the scope permitted herein and to support
volunteer employees based on the following terms:
a. One Hydro Cleaning Vactor Truck and associated equipment deployed to the
Gulf Coast region;
09/28/05
Page 7
b. Roundtrip transportation cost to deploy the asset authorized at an amount not to
exceed $5,000;
c. Sanitation District equipment is to be operated by Sanitation District employees
only;
d. Estimated equivalent cost of providing the equipment is an additional $20,000;
and
(4) Permit volunteer employees to engage in recovery efforts that are limited to the
rendering of specialized assistance in the areas of engineering, operations and
maintenance, and/or technical services in support of infrastructure recovery efforts
pertaining to the collection, treatment and/or disposal of wastewater and associated
byproducts.
19. Closed Session
CLOSED SESSION: During the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations, pending or
potential litigation, or personnel matters, pursuant to Government Code Sections
54956.8, 54956.9, 54957 or 54957.6, as noted.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives; or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted closed
session and are not available for public inspection. At such time as the Board takes
final action on any of these subjects, the minutes will reflect all required disclosures
of information.
a. Convene in closed session, if necessary
1. Conferences with Legal Counsel -Anticipated Litigation.
Significant exposure to litigation [Government Code Section 54956.9(b)]: One
matter;
Possible initiation of litigation [Government Code Section 54956.9(c)]: One
matter.
2. Consideration of Public Employee Discipline/Dismissal/Release.
[Government Code Section 54957(b)]: one matter.
3. Conference with Legal Counsel -Existing Litigation [Government Code
Section 54956.9(a)]: One case:
a. Pall Corporation v. OCWD and OCSD, Orange County Superior Court
Case No. 02CC06622
4. Conference with Real Property Negotiators [Government Code Section
54956.8]: One property:
..... ,•
Property: 7465 Lampson Avenue, Garden Grove, California
Agency Negotiator: Terry B. Knapper, CB Richard Ellis
09/28/05
Page 8
Negotiating Parties: Rob Guthrie, Guthrie Development; Frank Adler and Jeff
Hirsch, Lee & Associates
Under Negotiation: Price, terms and conditions for the purchase, sale
exchange, or lease of subject property.
b. Reconvene in regular session
c. Consideration of action, if any, on matters considered in closed session
20. Matters which a Director may wish to place on a future agenda for action and
staff report.
21 . Other business and communications or supplemental agenda items, if any
22. Future Meeting Date: The next Board of Directors regular meeting is scheduled for
October 26, 2005, at 7:00 p.m.
23. Adjournment
..........................................................................................................................................................................................................................................................................................
!NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the Board of !
1 Directors, items shall be submitted to the Board Secretary no later than the close of business 14 days 1
!preceding the Board meeting. The Board Secretary shall include on the agenda all items submitted by i
j Directors, the General Manager and General Counsel and all formal communications. j
1General Manager Blake Anderson (714) 593-7110 banderson@ocsd.com 1
!Board Secretary Penny Kyle (714) 593-7130 pkyle@ocsd.com i
!Director/Engineering David Ludwin (714) 593-7300 dludwin @ocsd.com i
!Director/Financerrreasurer Lorenzo Tyner (714) 593-7550 ltyner@ocsd.com i
!Director/Human Resources Lisa Tomko (714) 593-7145 ltomko@ocsd.com i
!Director/Information Technology Patrick Miles (714) 593-7280 pmiles@ocsd.com i
i Director/Operations & i i Maintenance Jim Herberg (714) 593-7020 jherberq@ocsd.com i
!Directorffechnical Services Bob Ghirelli (714) 593-7400 rqhirelli@ocsd.com i
1Director/Public Affairs Carol Beekman (714) 593-7120 cbeekman @ocsd.com 1
f Director/Regional Assets & f
!Services Nick Arhontes (714) 593-7210 narhontes@ocsd.com i
!.§~0.~r.~! .. g.C?..~n~~! .............................................. ~r.~~ .. t!.C?.9.in ................................... J?..~.~.l..?.?.~.~.?.~.9.~ ....... ~rh @wss-lf!V.:;.S9m. .......................................... !
H:\dept\agenda\Board Agendas\2005 Board Agendas\092805 agenda.doc
phone:
(71 4) 962-2411
fax:
(714) 962-0356
www.ocsd.com
mailing address:
P.O. Box 8127
Fount ain Valley. CA
92728-8127
street address:
10844 Ellis Avenue
Fountain Valley. CA
92708-7018
Member
Agencies •
Cities
Anaheim
Brea
Buena Park
Cypress
Fountain Valley
Fullerton
Garden Grove
Huntington Beach
Irvine
Le Habra
La Palma
Los Alamitos
Newport Beach
Orange
Placentia
Santa Ana
Seal Beach
Stanton
Tustin
Villa Park
Yorba Linda
County of Orange
Sanitary Districts
Costa Mesa
Midway City
Water Districts
Irvine Ranch
ORANGE COUNTY SANITATION D ISTR ICT
September 21 , 2005
To the Chair and Members
of the Board of Directors
Subject: Board Letter
The following are items that you may find interesting. If you need additional
information on any of the items, please call me.
Sanitation District Receives Award
On September 12, we received notification that the National Purchasing Institute has
awarded us its "Achievement of Excellence in Procurement." We are only one of 57
agencies in the country to receive this award four times or more. Marc Dubois, our
Purchasing Manager, and his team have done a great job. I have attached a copy of
the September 12 letter.
Are We Ready for the Big One?
The Sanitation District is committed to safeguarding its employees, facilities, the
public and the environment from man-made or natural disaster events or other
emergencies. Since 1997, the Integrated Emergency Response Plan (IERP) has
been in place. This comprehensive plan, addresses preparedness and response to
all types of foreseeable emergencies including: medical, fire, earthquake, utility
outages, chemical spills, flooding, etc. The plan is regularly reviewed and updated.
OCSD employees are trained biennially on the plan.
In FY 2004-05, six formal exercises were held to test the plan. After each exercise, a
debriefing is held to determine where OCSD's response can be improved. Six more
exercises are planned for FY 2005-06. A needs assessment for recovery operations
for all OCSD business functions has been budgeted in FY 2005-06.
Are we perfect? No. On the occasions where we implement the IERP for a real
event -the September 2004 discharge to the Santa Ana River, for instance -we find
rough spots and missed opportunities. (See following piece.) However, we always
conduct a "lessons learned" session after an event and incorporate that learning into
the IERP and its supporting policies and procedures.
With regard to the experience of Hurricane Katrina, we intend to listen for the lessons
learned of that event and wi ll change our IERP accordingly. ~<atrina is a real-life
example of a region-wide "Big One" from which we hope to improve our
preparedness.
To maintain world-class leadership in wastewater and water resource management.
'
Board of Directors
Page 2
September 21, 2005
Labor Day Weekend One Year Later
On September 4, 2004, the Sanitation District discharged an estimated 16 million
gallons of treated wastewater to the Santa Ana River. As a result of this discharge,
the O&M department conducted a thorough evaluation of the circumstances
surrounding this incident. The evaluation resulted in the development of 40 lessons
learned recommendations, which were communicated to the Regional Water Quality
Control Board. The recommendation list was developed to prevent the occurrence of
such an event in the future and to supplement the existing policies and procedures
currently in place for emergency and unusual operating conditions.
Of the 40 recommendations, 37 recommendations have been implemented.
Improvements include better communications procedures for call-ins during
emergencies, operational changes to increase the capacity of the plant to hold water
before discharging to the river, additional training for staff, and changes to the
electrical system to improve the reaction time to reconnect to Edison by 15 to 20
minutes. Two recommendations were deemed no longer necessary and will not be
implemented. The only remaining recommendation, involving the engineering of a
pressure relief system for the sewer trunks that are tributary to both plants, requires
further evaluation .to determine its feasibility. If deemed feasible, this
recommendation will be implemented within about three years.
The Grand Jury Is Asking
As I was completing this Board Letter, I received a formal inquiry from the Foreman of
the Grand Jury about our "business continuity plan ." We will respond of course,
beginning by sending them a copy of our Integrated Emergency Response Plan.
(See their letter attached.)
Hurricane Katrina Relief Drive
In the devastating aftermath of Hurricane Katrina, Sanitation District employees are
reaching out to help. To date they have donated several boxes of clothing and food,
as well as over $2,000 in cash to the Red Cross and Sa lvation Army in donation
boxes provided at Plants 1 and 2. Many have also submitted donations online,
through neighborhood and church drives, joined weekend walkathons to raise funds,
and some have volunteered their time to the rescue effort.
City Engineers to Hear Presentation on Urban Runoff Management.
Larry McKinney who manages the county's urban runoff efforts will be speaking to
the Orange County City Engineers. I have attached a flyer for your information.
Monday, October 3, 2005: Lunch at the Claim Jumper Restaurant in Fountain Valley.
RSVP City of Rancho Santa Margarita at (949) 635-1800 x6501 or e-mail
bschultz@cityofrsm.org by Thursday, September 29, 2005.
GWR System Elected Officials and Staff Workshop October 14
You and your staff are invited to attend this important workshop on Friday, October
14, at 11 :30 a.m. to 1 :30 p.m. at the Orange County Water District. The workshop is
designed to bring you up-to-date on the Groundwater Re plenishment System project
and construction progress. The event will feature an operational tour of the Phase
Board of Directors
Page 3
September 21, 2005
One GWR System which currently produces 5 million gallon per day (mgd) of purified
water. See how these purification technologies can create essentially bottled water
from highly treated sewer water in a matter of minutes. Invitations are in the mail.
Please R.S.V.P. to Lisa Cottini at (949) 583-2617 by October 7, 2005.
Centralized Training Works!
In FY 2004-05 the Sanitation District changed the way training funds were allocated.
A focused training approach was adopted. Divisional and central training budgets
combined into one centralized fund calculated at 2% of salaries. In previous years
the annual training budget was divided in half-with the Employee Development
Division managing 1 % and divisions administering the other 1 %. All training funds
were administered and managed by the Employee Development Division during FY
2004-05.
From FY 2003-04 to FY 2004-05, training expenditures increased just 1 % (from
$635,583 to $644,867). However, during that same period the number of training
classes and training hours increased dramatically. The number of classes offered
was raised by 50% (from 773 to 1166) and the tota l training hours showed an
increase of 43% (from 21,354 to 30,635). The Sanitation District got more training for
its money.
An initial update was provided to the EMT in January 2005, which was based on a
survey of managers and supervisors and contained overall positive results. Further
analysis at the conclusion of the fiscal year provided the statistics listed. The
additional positive and convincing data shows that the economies of scale have
benefited the Sanitation District. Training funds for FY 2005-06 have continued to be
centralized as a result. Centralized trai ning works!
Washwater Discharge
Washwater containing pathogen, toxics, metals, and other pollutants is generated
from mobile detailing, carpet cleaning, pressure washing, steam cleaning, and other
similar surface cleaning activities. Common practice is to discharge untreated
washwater into the storm drains rather than into the sewer system. The County of
Orange, through its stormwater permit, proposes to prohibit the discharge of
washwater into storm drains to minimize the impact of washwater pollution on local
Orange County beaches. However, practical disposal alternatives for washwater are
limited. Therefore, the County and Cities who are co-permittees on the stormwater
permit are seeking authorization to discharge washwater into the Sanitation District's
sanitary sewer system.
In response to this request, Sanitation District staff has agreed to accept the
discharge of washwater. Staff is working with the co-permittees to develop a set of
general guidelines for washwater generators to properly discharge washwater into
th e sewer system. The washwater guidelines will be provided to the County and
Cities along with educational outreach material, which will be distributed to all
washwater generators operating within the Sanitation District's service area. The
amount of washwater discharge is small, estimated at 175,000 gallons per day from
Board of Directors
Page 4
September 21, 2005
about 166 operators and should not have an immediate impact on our treatment
processes or ocean discharge permit requirements. Staff will be undertaking some
characterizations studies to better understand the quality of the washwater to ensure
that standards for the future Groundwater Replenishment System will be met.
Articles of Interest
I have also included several additional published articles that you might find
interesting.
If you would like additional information on any of the above items, please call me.
Blake P. Anderson
General Manager
BPA:gg
H:IDEPT\ADMIN\GM\BOARD LETTER\20051092105 BOARD L TR. FORM.DOC
Attachments
National Purchasing Institute
7.rD5 Sf P '2 O PH I?: ~ ,
-i September 12, 2005 Achievement or Excellence in Procurement'
Blake Anderson, General Manager
Orange County Sanitation District
l 0844 Ellis Ave.
Fountain Valley, CA 92708
ocso r. ·; ~:1 ii Room
Subject: Achievement of Excellence in Procurement Award
Dear Mr. Anderson:
The Achievement of Excellence in Procurement award is designed to recognize organizational excellence
in procurement. The award is achieved by those organizations that demonstrate excellence in
procurement by obtaining a high score on a rating of standardized criteria. The program is designed to
measure innovation, professionalism, e-procurement, productivity, and leadership attributes of the
procurement function. The Achievement of Excellence in Procurement is sponsored by the National
Purchasing Institute (NPI), the California Association of Public Purchasing Officers (CAPPO), Florida
Association of Public Purchasing Officers (F APPO), the Institute of Supply Management (ISM), and the
National Institute of Governmental Purchasing (NIGP), the National Association of State Procurement
Officials (NASPO) and the National Association of Educational Buyers (NAEB).
It is my pleasure to notify you that the Procurement Department for the Orange County Sanitation District
has earned the 10th Annual Achievement of Excellence in Procurement Award for 2005. Moreover,
Orange County Sanitation District is one of only 57 to receive this national award at least four times.
A beautiful trophy, which has developed into the AEP icon, will be presented at several locations or
mailed in mid-November, in accordance with the application.
Congratulations on receiving the Achievement of Excellence in Procurement Award.
Sincerely,
~~~
Director of Procurement
City of Tucson
**and**
Chairperson
Achievement of Excellence in Procurement Award Committee
cc: Marc Dubois, Purchasing Manager, Orange County Sanitation District
Achievement of Excellence in Procurement Award Committee
National Purchasing Institute I 65 Enterprise, Aliso Viejo, CA 92656
800-246-7143 I 949-715-7857 I Fax 949-715-6931 I www.nationalpurchasinginstitute.org
ISM ·= _ ... ...,__.,._
ORANGE COUNTY GRAND JURY
700 CIVIC CENTER DRIVE WEST• SANTA ANA, CALIFORNIA 92701 • 714/834-3320
FAX 714/834-5555
Mr. Blake P. Anderson, General Manager
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708
Dear Mr. Anderson:
September 19, 2005
The Orange County Grand Jury is reviewing the business continuity plans of selected
local, district and county government agencies. This review focuses on the agencies'
abilities to continue doing business after a disaster occurs. Disasters include both natural
causes (e.g., earthquakes, tsunamis, and floods) and terrorist attacks (e.g., chemical,
biological, nuclear and explosive).
Business continuity planning is the process of developing and testing arrangements and
procedures that allow critical business functions to continue after a disaster. It covers all
aspects of the business -its people, processes, information technology, facilities and
infrastructure.
Please let us know whom we should contact to begin the review of your organization's
business continuity plans. If you have a written plan, please send it to us, preferably in
electronic format and hardcopy.
Thank you,
Bette Flick, Foreperson
2005-2006 Orange County Grand Jury
-II
Board of Directors
I 2oos
I Stephen B.ad.um. ·
President
. City of Newport Beach . ~ '
Brad fowler
Vice President
City of Dana Point
Tom Wheeler
Secretary/l'reasurer
City of Rancho Santa
Margarita
Past Presidents:
David Webb
City of Huntington
Beach
Kenneth Rosenfield .
City of Laguna Hills
Chuck Handy
Thornton Piersall
'Ron Wolford
HughLBerrv
Jim Wheeler·
Joe Devlin
PhilipPeten
Robert C. Howes
An Scbaueder
Gary D. Johnson
BillMurphy .
Ben Minamidc
Wayne Osborne
G. Brent Muchow
GcorieTmdall
Bob Lcdendeckcr ·
Gary E. Johnson
Benjamin B. Nolan
Bruce D. Mattern
Samuel S. Johnson
Paul Cook
Dick Polen
Robert F. Beardsley
Bob Eichblatt
Don Jensen
Ted Simon
Don Webb
Bill Cameron
Bob Hodson
George Alvarez
lsmilc Noorbalcsh
I Bill Patapoff
Bill Morris
I Rusa Mcguire
Marwan Youssef
M;VdiAtaya
Harry Thomas
Phil Wary
Tim Serlet
f--CE A 0 C 1
1
,n~ l! -Qdw., ~:tG!~ !Ufk#JW!'iw::1w1::•:::1mmieo;i:o::e;:™.,.:w'N"IANP :.nw ~:'S""S
DATE:
TIME:
PLACE:
MENU:
DESSERT:
COST:
DUES:
SUBJECT:
-rhe C:::it:;y ETLgi.TLee-rs .A..ssoc"i~tioTL
c::>-ra. 'T'l. e C:::O'l.4.;Tl-.
*MEETING NOTICE*
Monday, October 3, 2005
11:45 a.m. Check-in and Social Time
12:00 p.m. Luncheon and Program
Claim Jumper Restaurant & Banquets Room
18050 Brookhurst Street
Fountain Valley, California
Rotisserie Chicken Buffet
Rotisserie Chicken, Mashed Potatoes .
House Salad, Caesar Salad and Garlic Cheese Toast
Brownies
$20.00 per member for Lunch
$20.00 for 2005
County Watershed Program
Larry McKinney, Manager
Watersheds and Coastal Resources of Orange County
RESERVATIONS: Call Engineering Department, City of RSM at (949) 635-1800 x6501
or e-mail at "bschultz@cityofrsm.org" by Thursday, September 29, 2005.
Cancellations must be made by Thursday noon, September 29,
to avoid being charged for the meal.
Thomas E. Wheeler, P.E.
City Engineer
City of Rancho Santa Margarita
THANK YOU!
Participating Cities: ARahtilll, Brra. Buena ParA:, Cemtor, Costa Me1a, 9fmis,. Dana Point, F1111nlain Va/lg, FN/lerto11, Garden Grow, Hnnlin~~ Beadl, I~,·~ Bwh, L1&tma Hilk, LFNz NtgmJ; ~ .WOodr, Li Habnz, LU.e FllfUI, La Palm4, LJs AhmilM, Missi111Z Vigo, Ne11-j1111t Bea&/J, On:nu; Pkzmma, BandJo S1111ta Mm,prita, S1111 Cfi!8en1t, SllliJ111111 Ozpirtnmo, Simla
Ana, Seal Btadl,SllZJtlo#, TllSfi11, Villa Panf:, Wutminstn-, Yorba Lilllla Participating Public Agencies: CallTtitis~ Distritt 12, Ruomw ad Dn.hp111111(M1111111p11tlll Dtparll'lltnl -Ortlll/I. Ctnm~T~'tlJdliflti!J, TmNportalioll Conidor .Agmrfu, oTtmgt Cosm!J Sani1111io11 Dittrid . . . . . . . . . .
'Massive' sewer project along Bushard due next year
A 9-foot...:wide pipeline project, which
has l~d to litigation and traffic woes in
Huntington Beach, figures to be a
'massive job,' city officials say.
By JEFF' OVERLEY
THE routlTAIH VALLEY VIEW
A sewer project that bas
~purred Litigation, traffic
headaches and neighborhood
nggrnvati9n in Huntington
Beach will make its way into
Fountain Valley next year.
Officia)s with the city and
Orange County Sanitation
District are ·still hammering
out specll'icS, but laying the
9-footrwide sewer pipe and
accessory structures under
Bu~hard Slreet will undoublr
edly be ·a "massive job," said
City Manager Ra.y Kromer.
Two phases of construction
are scheduled lo occur in ·
Fountru11 Valley. Orie mvolv~
laying the sewer pipe -be-
tween. Garfield and Ellis ave-
nues. Officials are trying to"
decide whether to close tbe
streei parl.ial.ly and finish
work in nfoe mm1ths, or close
the entil'e street and finish in
half the time, K:tom.er said.
Either way, traffic is «gojng
. to be.tedious for the r~idents
armmd there," .he said.
The other phase. involves
inst.ailing a water diversion Dozens of homeowners
structure under the intersec-ha\re joined in a -lawsuit that
Lion of Bushard Street and alleges the waler pumping
Ellis Avenue. Vv1tilc nothing led Lo cracked foundations,
has been M:diwd, it's pos~ waJls and swimming pools.
sible work will result in a Sanitation district officials
complete shutdown of the in-deny they're responsible, bQt
tersection · for roughly six admit the delays led to neigh-
montbS, said David Ludwin, borbood access being choked
director or engineering for off for months on end.
the sanitation district. · \Vork isn't expectecl to be
Work is tentatively ex-complete until eB!lY 2007,
pected to begin early next· .more lhan three'yeal:"S. behind
year, and· ·could be pursued scbedul~ But wnen construc-
concurrently with the laying tion starts up in spring 2006,
of the pipe. . officials say thete will be an
More dct.ails will be pre-emphasis on sticking to ti.me-
~ented during ·a public meet-Jines. .
ing on 'l'uesday, puL the s.ew~ Sa.id Ludwin: "There's ...
project's track: 1-ecord is work being done to try to
more than enough to mnke make this the least amount of
oity officials and residents , impact O!l the community."
squirm .
Shi:u::tty ·after beginning in
becember 2002, nearly 20
percent of the sewer p.ipe
-----------------,,..--,,.,,,,...,.----, joint~ began snapping. That.
· The City Ciluncil will .!!old a
study session on th(! Orange
County &m.itatlon District pro-
ject nli 6 p .m. Tuesday in council
-chambers, lc'.1200 Slater.Av~. · . led to a delay i.n work that
meant continuous pumping
from 20~foot-deep trenches
that dipped :below the water
!. table. ·
CONTACT THE WRll'ERt
(7 I 4)'44S·6683'or
}ov~rtty4tocre9i,ter.~om
Pipeline project
Orange County Sanitation District is
replaclnq a 54-inch-diameler underground
sewage pipe installed In 1954 with a
9·foot-wide pipe that travels from the
OCSD plant on Brookhurst StreeL across
Banning Avenue and north to Bushard
Street and £11is Awnue in Fountain Valley.
The project is more lhan a year
behind schedule because of problems
with cracks in the joints of the pipes.
Thi! \llew
Thursday, September 8, 2005
OC Register
City adopts first-ever
sewer fee
By ERIC CARPENTER
FULLERTON NEWS TRIBUNE
Help is soon on the way for Fullerton's
aging, crumbling sewer lines -but at a cost.
The City Council on Tuesday approved
plans to establish the first sewer
maintenance fee in city history.
The fee, based on a percentage of water
consumed, is expected to raise residential
bills an average of about $15 per month.
This is not pleasant. we've put off this sewer
fee every step of the way," Mayor Shawn
Nelson said. "But we need to fix our
systems. We need to comply with the law."
Fullerton is one of the few cities in Orange
County without a sewer maintenance fee.
Recent state and federal laws mandated
that Fullerton establish a revenue source for
dealing with its aging pipes.
The fee is expected to generate about $9.8
million annually to help repair and replace
430,000 linear-feet of sewer pipes that
crisscross city streets, many of them 50 to
100 years old.
By law, the city would have had to receive
14,458 protest letters to stop the fee. By
Tuesday, the city had received nine protest
letters.
More than a dozen residents -and some
business owners -came to speak against
the fee, saying it would create a financial
strain.
Officials from Kimberly-Clark, which uses
huge amounts of water to make its paper
products, said the fee would cost the
company more than $130,000 a year.
Unfair, they said, because the company pre-
treats its waste water before it goes into the
sewer system.
The council said it understands those
concems and made adjustments to allow for
large companies that pre-treat water to pay
a lower rate.
The council also made considerations to
reduce rates for residents who live on lots of
a half acre or more, because they
presumably use more water for irrigation -
water that won't wind up in the sewer pipes.
And reduced rates for seniors who live on
fixed incomes will be available.
The sewer fee will likely begin showing up
on water bills by January.
Sewer fee
Residents would be charged based on 40
percent of their monthly water consumption,
at a rate of$ 1.90 per 1,000 gallons used.
Residential with lots of a half acre or more
would be charged based on 20 percent of
consumption at the same rate.
Industrial properties would be charged at the
same rate, but based on 95 percent of their
monthly water consumption. Pre-treatment
of sewage will lower the fee.
Commercial properties would be charged
the same rate based on 1 00 percent of
water usage. Businesses not involved with
food services will be charged an unspecified
lower rate. For more information call (71 4)
738-6897and look in the future for an online
fee calculator.
'
Thursday, September 15, 2005
Garden Grove aims for sewer fixes
City Council approves rate hike to pay for $54 million in system
improvements.
By NGUYEN HUY VU
The Orange County Register
GARDEN GROVE -Beginning this week, most homeowners can
expect an increase of about $3 a month on their sewer bills to pay
for $54 million in improvements of the city's aging sewage
system.
The City Council voted, 4-1, Tuesday night to approve the
ordinance, which includes splitting sewer rates into 16 ciasses,
reducing hospitals fees to a maximum of $57 4 a month and
charging single-unit town homes and condominiums the same
rates as single-family homes.
Councilwoman Janet Nguyen said it was imperative to repair the
80-year-old system before a catastrophe occurs.
11lt's our responsibility to upgrade our infrastructure.'' she said
Wednesday.
Some business leaders balked at the initial proposal last month,
saying the brunt of the increase would fall on their shoulders
when residents make up the majority of sewer users.
Bob Fish, Garden Grove's Chamber of Commerce chairman, said
he was happier with the new version of the plan. The adjustments
are more equitable for businesses, he said.
11There will still be problems because the city makes certain broad
decisions that cover whole areas in commercial properties, 11 Fish
said. "There will still be inequities and that still needs to be
discussed. But city officials said they will be willing to lend a
friendly ear to businesses. 11
City officials estimate it will cost about $5.5 million annually for the
next 1 O years to update the sewer system to state standards. City
officials said its $500,000 annual budget wasn't enough to fix the
309 miles of cracked pipes clogged with grease and roots.
CONTACT US: (714) 445-6685 or vnquyen@ocregister.com
\
Kelp restoration efforts advance
By removing urchins and planting spores, divers add an acre of the brown algae to Orange
County coast.
By Andrew Edwards
(Published: August 31, 2005)
Three years of effort to restore kelp along the Orange County coastline has added more than an
acre of the brown algae to local waters, according to a recent report.
The report, released Tuesday by the California Coastkeeper Alliance, covers kelp reforestation
efforts from 2001 to 2004. The alliance coordinates the activities of multiple water-quality
groups in the state. The report summarized progress in kelp restoration from San Diego to
Santa Barbara.
During the period covered by the report, Orange County Coastkeeper was in charge of planting
and monitoring kelp near Crystal Cove and Laguna Beach. Coastkeeper was one of four
organizations that planted kelp, and the reported 4,500 square meters of kelp restored along the
local coastline was the largest amount of kelp added by any of the groups.
During restoration efforts, volunteer divers attached kelp spores to reefs. According to the
report, 70 volunteer divers made 170 trips to help bring kelp back to Orange County waters.
Divers also relocated more than 11,600 sea urchins that lurked near Orange County kelp beds,
according to the report.
The sea urchins were "just picked off and carried elsewhere," Coastkeeper Alliance executive
director Linda Sheehan said. "They're not cuddly."
Sea urchins eat kelp, and the report blamed urchins, as well as pollution, coastal development
and storms for the decline in Southern California's kelp forests. The Coastkeeper Alliance
believes kelp levels in Southern California have dropped 70% in the last century.
Marine biologist Nancy Caruso leads kelp reforestation work in Orange County. She said the
kelp beds planted near Crystal Cove still need time to grow before teeming forests of algae can
be seen from the shore.
"They're not huge giant kelp beds yet; they're still young," she said. "If you dive in off the reef,
you'll see it, but it's not thriving in gigantic masses."
Kelp is important, Caruso said, because the algae provides a habitat for fish and marine life.
Fish like to hide in kelp forests and can feed off the algae itself or animals, such as sea snails
and crabs, that live in kelp forests.
"It becomes like a nightclub," Caruso said, describing kelp forests as a gathering place for fish.
Orange County Coastkeeper left the Coastkeeper Alliance in March, and the Coastkeeper
Alliance took over management of the kelp project in Orange County. Around that time, Caruso
was laid off by Orange County Coastkeeper but was later hired to continue working on the kelp
project by the Coastkeeper Alliance.
Orange County Coastkeeper leaders said they wanted to focus on urban-runoff-related issues
when the group broke away from the Coastkeeper Alliance.
In early August, the National Oceanic and Atmospheric Administration awarded $220,000 to the
Coastkeeper Alliance to fund continued kelp restoration efforts. The California Coastal
Conservancy gave the group $200,000 to restore kelp in December.
*ANDREW EDWARDS can be reached at (714) 966-4624 or andrew.edwards@latimes.com.
-q
Orange County Sanitation District
MINUTES
BOARD MEETING
August 24, 2005
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
'
-J , Minutes for Board Meeting
Page2
08/24/05
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was held on
August 24, 2005 at 7:00 p.m., in the District's Administrative Offices. Following the Pledge of
Allegiance and invocation the roll was called and the Secretary reported a quorum present as
follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
x Steve Anderson, Chair Steve Simonian
x James M. Ferryman, Vice Chair Arlene Schafer
x Don Bankhead Leland Wilson
x Carolyn Cavecche Steve Ambriz
x Alberta Christy Mike Garcia
x Larry Crandall John Collins
x Bill Dalton Bruce Broadwater
x Doug Davert Tony Kawashima
Vacant x David Shawver
x Michael Duvall Keri Lynn Wilson
x Norman Eckenrode Constance Underhill
x Richard Freschi Patricia Bortle
x Jill Hardy Debbie Cook
x Sukhee Kang Steven Choi
x Phil Luebben Lydia Sondhi
x Patsy Marshall Jim Dow
A Darryl Miller Douglas Reinhart
x Roy Moore John Beauman
x Joy Neugebauer Vivian Kirkpatrick-Pilger
x Ken Parker Catherine Driscoll
Tod Ridgeway x Don Webb
x Harry Sidhu Bob Hernandez
x Jim Silva Lou Correa
x Mark Waldman Ralph Rodriguez
x Charles Antos Paul Yost
STAFF MEMBERS PRESENT: Blake P. Anderson, General Manager; Penny Kyle, Board
Secretary; Nick Arhontes; Bob Ghirelli; Jim Herberg; Dave Ludwin; Patrick Miles; Lisa Tomko;
Mike White; Lilia Kovac; Jennifer Cabral; Doug Stewart; Mike Moore; Steve DeWilde; Martin
Nix; John Swindler; Juanita Skillman; Matt Smith;
OTHERS PRESENT: Brad Hogin, General Counsel; Mark Miller; Don Hughes; David Moore;
Giovanna Piazza; Ed Soong.
Minutes for Board Meeting
Page3
08/24/05
PUBLIC COMMENTS
There were no public comments.
REPORT OF THE CHAIR
Chair Anderson regretfully announced the passing of Director Harry Dotson earlier that day.
Funeral arrangements were pending.
It was also noted with sadness the passing of Dr. Ron Linsky, Executive Director of National
Water Research Institute (NWRI). A "Celebration of Life" is being planned by his family to be
held mid-October.
The September dates for the standing committees were reviewed. Due to a conflict with the
League of Cities' annual conference, it has been determined the OMTS Committee will not meet
in October, and the PDC Committee will meet on October 13, 2005.
Chair Anderson announced the formation of an Ad Hoc Committee for CIP Oversight, and
appointed Directors Charles Antos, Carolyn Cavecche, Mike Duvall, Phil Luebben, Darryl Miller,
Tod Ridgeway and Mark Waldman. The committee will provide review and oversight of the
District's capital improvement program to ensure that financial impacts, engineering, operations
and permit compliance are taken into account during annual deliberations of the Sanitation
District's budget and user fees.
Chair Anderson also recognized Blake Anderson, General Manager, for 25 years of service to
the Orange County Sanitation District.
REPORT OF THE GENERAL MANAGER
Blake Anderson, General Manager, recognized employees Steve DeWilde and Martin Dix who gave
a presentation on the Sanitation District's Geographical Information System (GIS), and how it assists
staff working on the Dig Alert team.
REPORT OF THE GENERAL COUNSEL
Brad Hogin, General Counsel, reported the Bushard Trunk Sewer Rehabilitation settlement
agreement, authorized at the May 25, 2005 Board meeting, has been finalized and executed.
A brief update was given regarding the Pall litigation, which is in connection with the
Groundwater Replenishment System project. A mandatory settlement conference is scheduled
for September 16. The GWR System Steering Committee will discuss this issue in detail on
September 12. The demand by Pall has been reduced from $3 million to $580,000.
Mr. Hogin reported that a specific proposal has been received from Kimberly-Clarke with regard
to the tolling agreement, and staff has begun negotiations on the specifics for a settlement
agreement. He is hopeful that a final agreement will be ready for approval at the September
board meeting.
,
,
Minutes for Board Meeting
Page4
08/24/05
APPROVAL OF MINUTES
The Chair ordered that the minutes of the regular meeting held July 20, 2005 and the special
meeting held July 20, 2005, be deemed approved.
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and "B", attached hereto and made a part of these minutes.
ALL DISTRICTS 07 /15/05 07 /31 /05
$8.046.281.15 $38.888.422.92
Director Cavecche abstained from discussion and voting on Warrant Nos. 73570 and 73642.
Director Crandall abstained from discussion and voting on Warrant No. 73362, and opposed
Warrant No. 73617. Director Luebben abstained from discussion and voting on Warrant Nos.
73212, 73443, 73514, 73560, and 73733. Director Shawver abstained from voting on all
warrants. Abstentions were pursuant to California Government Code Section 84308
CONSENT CALENDAR
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. No items considered
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE: A verbal report was presented by Director Anderson, Chair
of the Steering Committee, re the August 24, 2005 meeting.
Chair Anderson reported on the CASA conference that was held in San Diego. Directors
Cavecche, Duvall and Silva attended, as well as several staff members. Blake
Anderson, General Manager, was elected to the CASA Board of Directors, and the
Steering Committee approved this appointment.
Director Cavecche announced that the Asset Management report would be presented to
all three committees in September.
Dr. Ghirelli advised staff would be meeting with SAWPA to discuss ways to economically
transport brines through the existing SARI line. He also reported staff would be meeting
with the Regional Water Quality Control Board to discuss a change in the Sanitation
District's disinfection program proposed by the Operations and Maintenance Department
that would save up to $1 million per year in chemical costs, while maintaining
compliance with the bacteria and chlorine limits in the ocean discharge permit.
Blake Anderson and Layne Baroldi met with the City of Los Angeles to discuss strategy
to address the Kern County ballot initiative that seeks to ban all biosolids land
Minutes for Board Meeting
Page 5
08/24/05
application in the unincorporated county areas. The ballot initiative petition is being
circulated in Kern County and requires 15,000 valid signatures to place the initiative on
the June 2006 ballot. The proponents of this initiative plan to collect 30,000 signatures
by December 2005.
Blake Anderson reported the Executive Management Team held a retreat on August 8,
2005, and will report to the Steering Committee in September on the team's strategic
initiatives. He reviewed the fiscal year 2004/05 legal fees. He also reported on AB 1234
which is likely to be approved by the legislature and signed by the governor, requiring
ethics training for all elected local officials every two years.
Director Davert, Chair of the Ad Hoc Committee re General Manager's Evaluation,
reported on the two meetings that have been held since the July 201h Board meeting.
The Ad Hoc Committee solicited bids from two firms and was recommending a contract
be awarded to Creative Management Solutions (CMS) for an amount not to exceed
$20,000. CMS would provide a comprehensive management audit and a performance
evaluation of the General Manager, and establish evaluation criteria. CMS will review
certain aspects of the Dharma Consultants audit, but the Steering Committee has
selected Moreland & Associates to conduct a compliance audit of the Dharma contract
to ensure proper procurement practices were followed.
MOVED, SECONDED AND DULY CARRIED: Approve a contract with Creative
Management Solutions to perform a management audit in an amount not to exceed
$20,000, in a form approved by General Counsel.
Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Steering Committee
Minutes for the meeting held on July 20, 2005, to be filed.
Non-Consent Calendar
No items considered.
12. URBAN RUNOFF AD HOC COMMITTEE: A verbal report was presented by Director
Bankhead, Chair of the Urban Runoff Ad Hoc Committee, re the August 3, 2005
meeting.
Staff advised there has been a significant decrease of bacterial levels at Huntington
State Beach since the Sanitation District began accepting urban runoff. Larry
McKenney, County of Orange Resources Department, described the County's plan to
carry out a Regional Water Quality Strategic Plan to promote regional collaboration
among local agencies focused on urban runoff. The County is planning to convene
three watershed management areas, and the Sanitation District's service area would be
covered under the north county area. A steering committee of elected officials
representing the County, Cities and special districts in each management area will be
created to oversee the program and to steer funding to projects. Director Bankhead also
requested authorization to designate a board member to serve on the north area
committee when it is formed.
•
l
Minutes for Board Meeting
Page 6
08/24/05
Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Urban Runoff Ad Hoc
Committee Minutes for the meeting held on August 3, 2005, to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution
No. OCSD05-22, in support of the County of Orange's efforts in the development
and implementation of a Regional Water Quality Strategic Plan.
Non-Consent Calendar
No items considered.
13. PLANNING. DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Planning, Design and
Construction Committee Minutes for the meeting held on August 4, 2005 to be
filed.
b. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 6 to
Secondary Treatment Facilities Process Upgrades at Plant No. 2, Job
No. P2-47-3, with Morrow-Meadows Corporation, authorizing an addition of
$31,879 and a time extension of 21 calendar days, increasing the total contract
amount to $5,916,918.
Director Cavecche abstained from voting pursuant to California Government
Code Section 84306.
c. MOVED, SECONDED AND DULY CARRIED: Approve time extensions to
Cooperative Projects Grants Program, Job No. J-73, Contract Nos. 0202, 0301,
and 0302 with the City of Anaheim; Contract No. 0102 with the City of Buena
Park; Contract No. 0303 with the Garden Grove Sanitary District; Contract Nos.
0106, 0108, and 0126 with the City of La Habra; Contract No. 0304 with the
Midway City Sanitary District; and Contract Nos. 0110 and 0212 with the City of
Seal Beach.
d. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 13 for
Area Classification Study Implementation Plan, Plant Nos. 1 and 2, Job
No. J-35-2, with J. F. Shea Construction, Inc., authorizing an addition of
$324,670, increasing the total contract amount to $17,295,353.
PDC Non-Consent Calendar
e. MOVED, SECONDED AND DULY CARRIED: 1) Ratify issuance of a Purchase
Order to Santa Ana River Interceptor 2005 Emergency Repairs from 10,000 CFS
Release, Contract No. 2-41-4, with RBF Consulting for aerial surveying for
$103,000; and,
Minutes for Board Meeting
Page7
08/24/05
2) Approve a Sole Source Professional Services Agreement with RBF Consulting
to provide field survey monitoring, construction staking services and topographic
aerial surveys for the Santa Ana River Interceptor Realignment and Protection,
Contract No. 2-41, for a total amount not to exceed $257,000.
f. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 3 to the
Professional Services Agreement with Malcolm Pirnie, Inc., for Ellis Avenue
Pump Station Rehabilitation, Job No. 1-10, providing for additional design
engineering services for an additional amount of $213, 194, and a contingency of
$100,000, increasing the total amount not to exceed $3,899,276.
g. Directors expressed concern regarding approving an addendum with Boyle
Engineering. Dave Ludwin, Director of Engineering, and Blake Anderson,
General Manager, reviewed the need to retain Boyle for the completion of the
project.
MOVED, SECONDED AND DULY CARRIED: Approve Addendum No. 8 to the
Professional Services Agreement with Boyle Engineering Corporation for
Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, providing for additional
engineering services for an additional amount of $121,905 increasing the total
amount not to exceed $2,467 ,825.
Directors Cavecche and Duvall opposed.
h. Dave Ludwin, Director of Engineering, provided a brief report on the need for the
budget increase and scope change for this project.
MOVED, SECONDED AND DULY CARRIED: Approve a budget increase for an
additional $1,495,000 for Electrical Equipment Refurbishment and Protection,
Job No. SP-81, for a total of $5, 132,000.
14. GWR SYSTEM STEERING COMMITTEE (GWRSSC):
GWRSSC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Steering Committee Minutes for the meeting held on
July 11 , 2005 to be filed.
GWRSSC Non-Consent Calendar
No items considered.
NON-CONSENT CALENDAR
15. MOVED, SECONDED AND DULY CARRIED: Receive and file Treasurer's Report for
the month of July 2005.
Director Alberta Christy removed herself from the room during consideration of the following
item.
Minutes for Board Meeting
Page8
08/24/05
16. (1) Direct staff to issue up to $200 million in new variable-rate Certificates of
Participation (COP) debt; and,
(2) Authorize the General Manager to negotiate and enter into a sole source Consultant
Services Agreement with Orrick, Herrington & Sutcliffe to provide bond counsel services
in an amount not to exceed $135,000.
Ed Soon of Public Resources Advisory Group (PRAG) provided an overview of the
report submitted for the proposed Certificate of Participation program and responded to
Directors' questions.
Following discussion, the motion was amended as follows:
MOVED, SECONDED AND DULY CARRIED: (1) Direct staff to initiate procedures to
issue up to $200 million in new variable-rate Certificates of Participation (COP) debt, and
return to the Board of Directors for approval to issue the COPs; and,
(2) Authorize the General Manager to negotiate and enter into a sole source Consultant
Services Agreement with Orrick, Herrington & Sutcliffe to provide bond counsel services
in an amount not to exceed $135,000.
Director Alberta Christy returned to the room.
17. CONVENE IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTION
54956.9: The Board convened in closed session at 8:45 p.m. pursuant to Government
Code Section 54956.9. Confidential minutes of the Closed Session held by the Board of
Directors have been prepared in accordance with California Government Code Section
54957 .2 and are maintained by the Board Secretary in the Official Book of Confidential
Minutes of Board and Committee Closed Meetings. A report of action taken will be
publicly reported at the time the approved action becomes final re Agenda Item
No. 17(a)(1 ).
RECONVENE IN REGULAR SESSION: The Board reconvened in regular session at
8:50 p.m.
ADJOURNMENT: The Chair declared the meeting adjourned at 8:52 p.m., in memory of
Director Harry Dotson and Ron Linsky, Executive Director of NWRI.
H:\dept\agenda\Board Minutes\2005 Board Minutes\082405 minutes.doc
Claims Paid From 07/01/05 to 07/15/05
Warrant No. Vendor
Accounts Payable -Warrants
73129 Driver Alliant Insurance Service, Inc.
73130 NRG Thermal Services, L.L.C.
73131 J F Shea Construction, Inc.
73132 Aurora Pictures, Inc.
73133 California Utility Equipment
73134 Compressor Components of California
73135 Costa Mesa Sanitary District
73136 County of Orange -Auditor Controller
73137 County of Orange -Auditor Controller
73138 County of Orange -Auditor Controller
73139 County of Orange -Auditor Controller
73140 County of Orange -Auditor Controller
73141 County of Orange -Auditor Controller
73142 County of Orange -Auditor Controller
73143 County of Orange -Auditor Controller
73144 CEM Corporation
73145 CWEA Membership
73146 Ors. Foster & Smith, Inc.
73147 DTSC (Dept. of Toxic Substances Control)
73148 Harrington Industrial Plastics, Inc.
73149 Voided Check
73150 I. D. Industries, Inc.
73151 Jamison Engineering Contractors, Inc.
73152 Midway Mfg. & Machining Co.
73153 Nextel Communications
73154 Public Resources Advisory Group
73155 Rota Rooter -N.O.C. #11
73156 RMS Engineering & Design, Inc.
73157 Scientific Refrigeration
73158 SAR BS
73159 Schock Boats
73160 SCWMF
73161 The JG Press, Inc.
73162 Townsend Public Affairs
73163 Ultra Wheel Company
73164 United Pacific Services, Inc.
73165 Vortex Industries, Inc.
73166 The Wackenhut Corporation
73167 WEFTEC
73168 James W. Silva
73169 Leandra P. Catacutan
73170 Robert G. Kizanis
73171 Jeffrey L. Peterson
73172 PRSA -Orange County Chapter
73173 Court Order
73174 County of Orange
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -07-15-05
fint21onc
$
Amount
408,329.63
165,537.48
235,742.50
850.00
1,238.91
3,950.00
2,684.94
10,142.00
857.50
385.00
105.00
1,190.00
1,575.00
280.00
69.00
575.00
97.00
111.09
660.00
9,848.15
316.57
984.00
10,681.39
871.02
6,000.00
642.25
550.84
2,821.67
290.00
9,758.24
25.00
129.00
5,000.00
5,033.56
900.00
733.00
13,970.45
1,910.00
310.00
59.50
130.00
54.50
62.00
150.00
150.00
Description
Excess Municipal Liability Insurance
Professional Services J-79
Construction J-71-3, Retention
Safety Video
Mechanical Parts & Supplies
Repairs & Maintenance Services -(58) lgnitors
Sewer User Fee for OCSD Transfer of Sewers
Encroachment Permits 7-36
Encroachment Permits 7-41
Encroachment Permits 7-41
Encroachment Permits 7-39
Encroachment Permits 7-36
Encroachment Permits 7-41
Encroachment Permits 7-39
Encroachment Permits 07-22-1
Lab Equipment Service -Microwave Digestion Systems
Membership (Calif. Water Environment Assoc.)
Lab Parts & Supplies
Hazardous Waste Disposal Fee
Plumbing Supplies
Mechanical Parts & Supplies
Repair & Maintenance Services -Concrete Repairs
Mechanical Parts & Supplies
Cellular Phones & Air Time
Financial Advisory Services
Maintenance Services -Unplugging Drains at Primary Scrubbers
Professional Services -Monorail Crane System at Central Power Gen. Building
Refrigerator Repair
Training Registration
Boat Tender, Boat Trailer & Motor
Membership (Southern Calif. Waste Management Forum)
Books & Publications
Legislative & Executive Advocate for Grant Funding
Reconciliation User Fee Refund Program
Landscape Maintenance at Slater Pump Station
Door Repair
Security Guards
Environmental Compliance Services Division Meeting Registration (Water Envim. Fed.)
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Public Affairs Administration Division Meeting Registration (Public Reis. Soc. of Amer.)
Wage Garnishment
Wage Garnishment
Page 1of7
EXHIBIT A
8/1/2005
.. ,
Claims Paid From 07/01/05 to 07/15/05
Warrant No. Vendor
73175 Court Trustee
73176 Department of Child Support Services
73177 Employee Benefits Specialists, Inc.
73178 Court Order
73179 Franchise Tax Board
73180 Internal Revenue Service
73181 Intl. Union. of Oper. Eng. AFL-CIO Local 501
73182 Court Order
73183 National Bond & Trust
73184 OCEA
73185 Peace Officers Council of CA
73186 Court Order
73187 United Way
73188 Court Order
73189 Mark S. Roberts
73190 City of Huntington Beach
73191 American Express
73192 ADS Environmental Services, Inc.
73193 Basic Chemical Solutions
73194 Black & Veatch Corporation
73195 Brown & Caldwell
73196 Bush & Associates, Inc.
73197 CPEIA
73198 Driver Alliant Insurance Service, Inc.
73199 Earth Tech, Inc.
73200 Environmental Engineering & Contracting
73201 Fluor Enterprises, Inc.
73202 Geomatrix Consultants, Inc.
73203 Insight Investments
73204 IPMC c/o Parsons
73205 Kemiron Companies, Inc.
73206 MWH Americas, Inc.
73207 Orange County Water District
73208 Pioneer Americas, Inc.
73209 Plumbers Depot, Inc.
73210 Polydyne, Inc.
73211 SoftChoice Corp.
73212 Southern California Edison
73213 Tula Ranch/Magan Farms
73214 U.S. Metro Group, Inc.
73215 ARB, Inc.
73216 Kiewit Pacific Co.
73217 Steve P Rados, Inc.
73218 Union Bank of California
73219 A-1 Fence Company (A-1 Enterprises, Inc.)
73220 Absolute Standards, Inc.
73221 AccuStandard, Inc.
H:\dept\fin\EXCEL.dla\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-07-15-05
fin/210nc
Amount
454.49
188.50
9,622.66
445.00
50.00
300.00
3,960.06
225.00
3,206.34
654.11
1,656.00
721.50
215.00
597.50
164.00
2,402.00
36,960.42
27,525.00
34,769.86
270,924.42
27,396.78
45,996.00
205,721.00
610,281.00
107,863.29
93,103.15
85,120.41
29,331.15
32,785.50
1,047,788.00
106,183.65
38,831.89
88,310.56
160,904.87
47,126.62
98,224.18
33,329.34
57,117.93
269,396.39
29,322.50
343,208.80
189,270.00
25,427.70
36,398.20
2,467.00
75.00
211.56
Description
Wage Garnishment
Wage Garnishment
Reimbursed Prepaid Employee Medical & Dependent Care
Wage Garnishment
Wage Garnishment
Wage Garnishment
Dues Deduction
Wage Garnishment
U.S. Savings Bonds Payroll Deductions
Dues Deduction
Dues Deduction, Supervisors & Professionals
Wage Garnishment
Employee Contributions
Wage Garnishment
Meeting/Training Expense Reimbursement
Permit Fee -P2-66
Purchasing Card Program, Misc. Supplies & Services
Professional Services J-73-2
Sodium Bisulfite & Sodium Hydroxide
Engineering Services P1-76 & J-102
Professional Services CMOM/WDR
Professional Services 7-36 & 7-41
Excess Workers' Compensation Insurance (CA Public Entity Insurance Authority)
All Risk Property & Fire Insurance
Professional Services P1-100
Professional Services -Fats, Oil & Grease (FOG) Study
Engineering Services J-84
Soils, Concrete & Other Materials Testing
Computer/Hardware -Network Hardware
Engrg. Services-Integrated Program/Project Mgmt., Temporary Staffing, Mat'ls. & Supplies
Ferric Chloride MO 9-27-95
Professional Services P2-74
Green Acres Project (GAP)
Sodium Hypochlorite
Color Closed Circuit Television Video Pipeline Inspection System
Cationic Polymer MO 3-11-92
Annual Software Services
Power
Residuals Removal MO 3-29-95
Janitorial & Floor Maintenance at Plants 1 & 2
Construction 7-41
Construction 5-51 & 5-52
Construction 1-2-4
Construction 7-41, Retention & 7-36, Retention
Chain Link Fence
Lab Parts & Supplies
Lab Parts & Supplies
Page 2 of 7
EXHIBIT A
8/1/2005
Claims Paid From 07/01/05 to 07/15/05
Warrant No.
73222
73223
73224
73225
73226
73227
73228
73229
73230
73231
73232
73233
73234
73235
73236
73237
73238
73239
73240
73241
73242
73243
73244
73245
73246
73247
73248
73249
73250
73251
73252
73253
73254
73255
73256
73257
73258
73259
73260
73261
73262
73263
73264
73265
73266
73267
73268
Vendor
Ace Ergonomics
Advance Business Graphics
Agilent Technologies, Inc.
Airco Filter Service
Airgas Safety, Inc.
American Air Filter, Inc.
American Airlines, Inc.
American Payroll Association
American Red Cross
American Seals West
Aquatic Bioassay And Consulting Labs, Inc.
Arizona Instrument
AD TECH
AEE-SCC
ASTD American Society for Training & Dev.
AWSI
Baker Tanks
Battery Specialties
Cal-Glass, Inc.
California Auto Collision
California Dept. of Fish and Game
California Relocation Services, Inc.
Calolympic Safety
Caltrol, Inc.
Cambridge Isotope Labs
Carollo Engineers
Center for Creative Growth
City of Tustin
Cole-Parmer Instrument Co.
Compressor Components of California
Computer Protection Technology, Inc.
Consolidated Elect. Distributors, Inc.
Consumers Pipe & Supply Co.
Cooper Cameron Corporation
Cornerstone Systems, Inc.
Corporate Business Interiors
Corporate Express
Corporate Image Maintenance, Inc.
Council on Education in Management
County Wholesale Electric Co.
CA Emissions Program
Controlled Motion Solutions
CWEA
De Gue lie Glass Co., Inc.
Del Mar Analytical
Dexon Computer, Inc.
Dionex Corporation
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report· 07-15-05
fin121onc
Amount
750.00
1,206.85
478.95
193.75
6, 136.21
1,482.56
3,313.30
999.00
634.50
37.83
785.00
10,866.96
659.00
45.00
169.00
282.00
571.20
1,431.67
407.30
1, 115.70
1,390.50
206.25
192.12
7,062.50
761.73
22,179.69
2,500.00
645.73
213.38
3,520.00
9,862.50
256.02
29.80
1,109.45
14,160.44
1,941.10
1,543.77
168.00
1,045.00
8.28
16.80
654.05
39.50
848.38
704.00
3,399.45
5,937.18
Description
Professional Services -(10) Ergonomic Workstation Evaluations
Printing Services -Business Cards
Lab Parts & Supplies
Filters
Safety Supplies
Filters
Travel Services
Training Registration
CPR Training & Miscellaneous Supplies
Gaskets
Whole Effluent Toxicity Testing
Instrument Parts & Supplies -Jerome Analyzer
Electrical Parts & Supplies
Membership (Assoc. of Energy Engineers -So. Calif. Chapter)
Membership
Department of Transportation Program Management & Testing
Tank Rentals
Batteries
Lab Equipment Service
Truck Body Repairs -V-479
Permit Fee -2-41-04
Office Files Moving/Relocation Services
Instrument Parts & Supplies
Mechanical Parts & Supplies
Lab Parts & Supplies
Professional Services P2-60
Professional Services -Executive Management Coaching
Water Use
Pump Shaft
Repairs & Maintenance -Rebuild (32) Pilot Fuel Valves
Computer Maint. Agreement
Electrical Parts & Supplies
Plumbing Parts & Supplies
Engine Supplies
Software Maintenance & Support -Symantec Brightmail Anti-Spam 6.0
Miscellaneous Office Furniture
Office Supplies
Custodial Services Spec. No. 9899-09
Employee Development Division Meeting Registration
Electrical Parts & Supplies
Vehicle Smog Testing Transmission
Mechanical Parts & Supplies
Membership (Calif. Water Environment Assoc.)
Window Glass Repairs/Replacement
Analysis of Biosolids
Computer Software/Hardware VAX Workstation
Lab Parts & Supplies
Page 3of7 EXHIBIT A
811/2005
Claims Paid From 07/01/05 to 07/15/05
Warrant No.
73269
73270
73271
73272
73273
73274
73275
73276
73277
73278
73279
73280
73281
73282
73283
73284
73285
73286
73287
73288
73289
73290
73291
73292
73293
73294
73295
73296
73297
73298
73299
73300
73301
73302
73303
73304
73305
73306
73307
73308
73309
73310
73311
73312
73313
73314
73315
Vendor
Duke's Root Control, Inc.
Dunn-Edwards Corporation
Dezurik Water Controls
DGA Consultants, Inc.
OHL Express (USA), Inc.
Dr. Harvey Goldstone
Edinger Medical Group, Inc.
Enchanter, Inc.
Environmental Engineering & Contracting
Voided Check
Stearns Bank, N.A.
FedEx Corporation
Fisher Scientific Company, L.L.C.
Flow Science, Inc.
Foodcraft Coffee & Refreshment Services
Forkert Engineering & Surveying, Inc.
Franklin Covey
Frasco Profiles
Farwest Corrosion Control Co.
George T. Hall
George Yardley Co.
Gerhardt's, Inc.
Goldenwest Window Service
John G. Gonzalez
Goodway Technologies Corp.
Grainger, Inc.
Guarantee Records Management
GE Analytical Instruments, Inc.
Haaker Equipment Company
Hach c/o Ponton Industries
Harold Primrose Ice
Harrington Industrial Plastics, Inc.
Harvard Business Review
Herb's Blackforest Bakery & Deli
Hill Brothers
Hoerbiger Service, Inc.
Home Depot
City of Huntington Beach
HOR Engineering, Inc.
Industrial Distribution Group
Industrial Filter Manufacturers, Inc.
Industrial Metal Supply
Industrial Threaded Products, Inc.
Iron Mountain
Irvine Ranch Water District
J R Filanc Construction
J.G. Tucker and Son, Inc.
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-07-15-05
fin1210nc
Amount
17,308.74
407.69
1,170.97
6,881.00
70.38
660.00
545.00
2,600.00
6,240.00
1,777.36
110.06
5,902.96
7,930.28
643.09
2,745.00
83.91
480.50
2,084.69
78.66
631.42
3,552.09
720.00
59.50
83.23
1,571.53
288.14
1,355.88
178.44
6,858.32
129.50
3,871.98
99.00
289.50
21,174.70
269.97
639.40
12,667.53
1,627.99
1,953.97
1,990.05
64.05
2,294.50
303.75
9.46
8,603.38
3,253.73
Description
Sewer Root Control Service
Paint Supplies
Plug Valves
Professional Services -CCTV Data Evaluation & Support
Freight Services
Safety Glasses
Medical Screenings
Ocean Monitoring & Outfall Inspection & Maintenance
Grease Interceptor Inspections
Hydrochloric Acid
Freight Services
Lab Parts & Supplies & Chemicals
Professional Services -Flow Modeling
Meeting Supplies
Engineering Services P1-76 & P2-66
Office Supplies
Human Resources Background Checks
Instrument Parts & Supplies
Flow Meter
Valves
LSVB Spark Plugs
Landscape Maintenance at Digesters
Meeting/Training Expense Reimbursement
Miscellaneous Maintenance Supplies
Filters & Rivets
Off-Site Records Storage
Lab Parts & Supplies
Misc. Vehicle, Parts, Repairs & Service
Lab Parts & Supplies
Ice For Samples
Pump & Plumping Parts & Supplies
Publication
Meeting Expenses
Chemicals -Odor & Corrosion Control -Newport Trunkline
Compressor Parts
Misc. Repair & Maintenance Material
Water Use
Professional Services P2-82
Mechanical Parts & Supplies
Filters
Metal
Fasteners
Shredding Services
Water Use
Construction 5-55
Flash Protection Gloves & Specialty Gases
Page 4 of 7
EXHIBIT A
8/1/2005
Claims Paid From 07/01/05 to 07/15/05
Warrant No.
73316
73317
73318
73319
73320
73321
73322
73323
73324
73325
73326
73327
73328
73329
73330
73331
73332
73333
73334
73335
73336
73337
73338
73339
73340
73341
73342
73343
73344
73345
73346
73347
73348
73349
73350
73351
73352
73353
73354
73355
73356
73357
73358
73359
73360
73361
73362
Vendor
J. L. Wingert Co.
Jamison Engineering Contractors, Inc.
Jay's Catering
Johnson Ukropina
Johnstone Supply
Kalmar Promotions
Kleinfelder, Inc.
Konnie K. Gallery
Lab Safety Supply, Inc.
Lindberg, Mead, Drill & Pezzillo, L.L.P.
Lorman Education Services
LINJER
McJunkin Corporation
McMahan Business Interiors
McMaster-Carr Supply Co.
Mid-West Associates
Midway Mfg. & Machining Co.
Milltronics c/o RMB Engineering
Motion Industries, Inc. CA 55
Marc Boney
Miller Brooks Environmental, Inc.
MVA Architects
National Plant Services, Inc.
Neal Supply Co.
The Norco Companies
Networkguys, Inc.
NRG Thermal Services, L.L.C.
Office Depot Business Services Div.
Olympic Creations
Omega Industrial Supply, Inc.
OneSource Distributors, Inc.
The Orange County Register
Orange Fluid System Technologies, Inc.
Osterbauer Compressor
Oxygen Service Company
P.L. Hawn Company, Inc.
Pacific Mechanical Supply
Partners Consulting Services
Pen Valve
PerkinElmer LAS
Primary Source Office Furnishings, Inc.
PrinterGuy
Prudential Overall Supply
PCG Industries
PCS Express, Inc.
R. L. Abbott & Associates
Rainbow Disposal Co.
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-07-15-05
fin/210nc
Amount
2,237.65
4,500.00
1,106.62
6,000.00
608.57
996.14
1,794.00
199.91
1,428.79
4,670.00
349.00
4,977.91
1,538.62
306.66
2,328.90
924.35
2,160.39
1,225.18
630.73
13,200.00
8,500.00
1,279.38
6,705.00
125.06
672.47
5,103.00
1,149.98
1,716.30
1,717.60
1, 132.28
834.33
1,783.52
1,423.57
3,054.82
432.22
2,164.09
586.02
2,880.00
329.82
35.85
4,140.84
3,684.91
4,665.02
400.00
122.00
3,000.00
2,973.12
Description
Welding Safety Supplies
Prof. Serv. -Confined Space Entry-0.0.B.S. Wetwell & Inspection Services
Meeting Expenses
Prof. Serv. -Corporate Identity & Public Awareness Project
Electrical Parts & Supplies
Stationery & Office Supplies -OCSD Pens Re Biosolids Program
Soils, Concrete & Other Materials Testing -P2-66-2
Picture Framing
Fiberglass Signs
On-Site Training -Construction Management Training
Safety & Health Division Meeting Registration
Professional Service -DART MO 9-22-99
Plumbing Supplies
Miscellaneous Office Furniture
Door, Tools & Mechanical Supplies
Instrument Parts & Supplies
Mechanical Parts & Supplies
Electrical Parts & Supplies
Mechanical Parts & Supplies
Professional Services -EMT Recruitment
Professional Services -UST Feasibility Study & Corrective Action Plan
Professional Services -North County Yard Site Evaluation and 0 & M Office Alternatives
Vacuum Truck Services
Plumbing Supplies
Mail Delivery Service
Software Licenses
Mechanical Parts & Supplies
Office Supplies
OCSD Logo Etched Badges
Janitorial Supplies
Electrical & Mechanical Parts & Supplies
Notices&Ads
Plumbing Parts & Supplies
Mechanical Parts & Supplies
Specialty Gases
Electrical Parts & Supplies
Plumbing Supplies
FIS On-Site Support -Help Desk
Plumbing Parts & Supplies
Lab Parts & Supplies
Office Furniture
Printer Maintenance
Uniforms & Related Articles
Repair & Maintenance Services -Keyways
Courier Service
Kern County Biosolids Consulting Services
Trash Removal
Page 5 of 7 EXHIBIT A
8/1/2005
c::i\
Claims Paid From 07/01/05 to 07/15/05
Warrant No.
73363
73364
73365
73366
73367
73368
73369
73370
73371
73372
73373
73374
73375
73376
73377
73378
73379
73380
73381
73382
73383
73384
73385
73386
73387
73388
73389
73390
73391
73392
73393
73394
73395
73396
73397
73398
73399
73400
73401
73402
73403
73404
73405
73406
73407
73408
73409
Vendor
Restek Corp.
Retrofit Parts & Components, Inc.
Ricoh Business System
Rolls-Royce Energy Systems, Inc.
Royale Cleaners
RBF Engineers
RPM Electric Motors
RS Hughes Co, Inc.
RTM Lighting & Electronics, Inc.
Schwing America, Inc.
Science Applications Intl., Corp.
Scottel Voice & Data, Inc.
Sewer Equipment Company of America
Sigma-Aldrich, Inc.
Skalar, Inc.
South Coast Air Quality Management Dist.
South Coast Air Quality Management Dist.
South Coast Roof, Inc.
Southern California Water
Southern Counties Lubricants
Spectrum Video, Inc.
Spex Certiprep, Inc.
Summit Steel
Sunset Industrial Parts
SBC
SBC/MCI
SKC-West, Inc.
Tetra Tech, Inc.
Thompson Industrial Supply, Inc.
Time Warner Communication
Tony's Lock & Safe Service & Sales
Tri-State Seminar On-the-River
Truck & Auto Supply, Inc.
TMOBILE
Ultra Scientific
United Pacific Services, Inc.
US Equipment Co., Inc.
US Plastic Corp.
Vapex, Inc.
Verizon California
Verne's Plumbing
Village Nurseries
Vortex Industries, Inc.
VWR Scientific Products Corporation
Waco Filter
WateReuse Association
West-Lite Supply Company, Inc.
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-07-15-05
fin/210nc
Amount
136.86
192.69
4, 190.19
187.00
12.00
6,500.04
2,469.42
116.17
1,003.66
881.96
3,059.57
2,284.80
1,400.75
5,776.38
17.63
531.04
531.04
4,720.60
133.21
4,600.90
6,465.50
1,170.85
4,563.77
949.39
1,558.23
779.01
5,158.85
438.83
299.25
51.07
562.11
225.00
228.00
163.61
530.27
16,467.51
1,106.54
29.45
6,658.50
711.16
600.00
125.85
588.26
7,854.19
283.45
450.00
16.70
Description
Lab Parts & Supplies
Mechanical Parts & Supplies
Color Copier Lease
Electrical Parts & Supplies
Dry Cleaning Services
Surveying Services 2-41-04
Maintenance Services -Electric Motor/Fan Blower Model
Paint Supplies
Electrical Parts & Supplies
Pump Filters
Ocean Monitoring MO 6-8-94
Telephone System Maintenance
Hoses
Lab Parts & Supplies
Lab Parts & Supplies
Annual Emission, Operation & Misc. Fees
Annual Emission, Operation & Misc. Fees
Roof Repairs & Maintenance Services
Water Use
Turbine Oil
Professional Services J-84
Lab Parts & Supplies
Metal
Motors
Telephone Services
Telephone Services
Instrument Parts & Supplies
Ocean Monitoring
Mechanical Parts & Supplies
Cable Services
Locks & Keys
Training Registration
Automotive Supplies
Wireless Air Time
Lab Parts & Supplies
Landscape Maintenance at Slater Pump Station
Coolant
Plumbing Parts & Supplies
Pump Parts & Supplies
Telephone Services
Repairs & Maintenance-Toilet
Landscaping Supplies
Door Repair
Lab Parts & Supplies
Air Filters
Lab Administration/Quality Assurance Meeting Registration
Electrical Parts & Supplies
Page 6of7
EXHIBIT A
8/1/2005
Claims Paid From 07/01/05 to 07/15/05
Warrant No.
73410
73411
73412
73413
73414
73415
73416
73417
73418
73419
73420
73421
73422
73423
73424
73425
73426
73427
73428
73429
73430
73431
73432
73433
73434
73435
73436
73437
Vendor
Wilson Supply, Inc.
WEF
WQI
Union Bank of California
Wells Fargo Bank
Thomas M. Blanda
Carla D. Dillon
Kimberly A Erickson
Ingrid G. Hellebrand
Vladimir A Kogan
James W. Matte
Umesh N. Murthy
Andrew H. Nau
Madankumar B. Patel
Vanh Phonsiri
Jeremy J. Saum
Mahin Talebi
Robert J. Taylor
Daniel R. Tremblay
Paula A. Zeller
Marian M. Alter
County of Orange
County of Orange
Michelle R. Hetherington
Local Agency Formation Commission
Local Agency Formation Commission
Orange County Sanitation District
Orange County Sanitation District
Total Accounts Payable • Warrants
Payroll Disbursements
38203 -38312 Employee Paychecks
38313 -38352 Employee Paychecks
113382 -113948 Direct Deposit Statements
Total Payroll Disbursements
Wire Transfer Payments
OCSD Payroll Taxes & Contributions
JP Morgan Chase Bank
JP Morgan Chase Bank
Total Wire Transfer Payments
Total Claims Paid 07/01/05 -07/15/05
H:\depl\fin\EXCEL.dla\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report· 07-15-05
fin/210nc
Amount
913.72
316.00
500.00
2,825.30
21,030.00
243.00
1,369.59
721.77
223.73
1,699.93
1,780.79
154.00
705.35
150.00
739.71
345.79
1,086.70
1,509.21
1,024.03
364.77
200.00
43.00
43.00
839.73
1,150.00
1,150.00
17,275.75
1,671.94
$ 5,624,870.91
$ 160,873.92
159,379.42
1,082,226.85
$ 1,402,480.19
$ 860,370.05
82,740.58
75,819.42
$ 1,018,930.05
$ 8,046,281.15
Description
Plumbing Parts & Supplies
Membership -Water Environment Federation
Training Registration
Construction 1-2-4, Retention
Construction 5-52, Retention
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Annexation Fee
Annexation Fee
Meeting/Training Expense Reimbursement
Annexation Fees
Annexation Fees
Worker's Comp. Reimb.
Petty Cash Reimb.
Biweekly Payroll 07/06/05
Retros, Cancelled, Idea, Mgr. llS, Term. & Retirements Checks 07/05/05 to 07107105
Direct Deposit Statements 07 /06/05
Biweekly Payroll & Retirements 07/06/05 & 07/07/05
June Interest Payment on Series 1993 Certificates of Participation
June Societe Generale Payment on 1993 Series Certificates of Participation
Page 7of7
EXHIBIT A
8/112005
~I IA
Claims Paid From 07/16/05 to 07/31/05
Warrant No. Vendor Amount Description
Accounts Payable -Warrants
73438
73439
73440
73441
73442
73443
73444
73445
73446
73447
73448
73449
73450
73451
73452
73453
73454
73455
73456
73457
73458
73459
73460
73461
73462
73463
73464
73465
73466
73467
73468
73469
73470
73471
73472
73473
73474
73475
73476
73477
73478
73479
73480
73481
73482
Kaiser Foundation Health Plan
National Water Research Institute
Orange County Water District
$ 68,102.61 Medical Insurance Premium
So. Cal. Gas Company
Southern Calif Coastal Water Research
Southern California Edison
State Board of Equalization
Air & Waste Management Assoc.
American Airlines
Arch Wireless
Ashbrook Corporation
American Telephone & Telegraph Corp.
Beckman Instruments, Inc.
Keith Boger
Brenntag Pacific, Inc.
Cal-Glass, Inc.
Centralia School District
Cingular Wireless
Court Order
Compressor Components Of California
Consolidated Elect. Distributors, Inc.
Consumers Pipe & Supply Co.
County of Orange
County of Orange -Auditor Controller
Court Trustee
CASA (Calif. Assoc. of Sanitation Agencies)
CCAC -City Clerks' Association of CA
CEM Corporation
CMAA
CR&R, Inc.
CWEA Membership
Department of Child Support Services
Employee Benefits Specialists, Inc.
Environmental Resource Association
Court Order
Excel Door & Gate Company, Inc.
First American Real Estate Solutions
Fisher Scientific Company
Fountain Valley Rancho Hand Wash
Franchise Tax Board
Frost Company
Grainger, Inc.
Hach c/o Ponton Industries
Home Depot Credit Services
Informatica Corporation
H:\dept\fin\EXCEL.dta\220\APSHARE\Clalms Paid Report\05-06\Claims Paid Report • 07 -31-05
fin/210nc
50,000.00
4,909, 739.22
37,628.01
336,528.00
30,626.48
37,490.28
445.00
4,904.60
1, 155.66
733.18
29.57
1,701.00
495.00
159.65
168.33
2,644.00
8,157.31
150.00
3,950.00
191.91
1,527.22
150.00
20.47
454.49
1,875.00
250.00
1,074.77
510.00
315.00
236.00
188.50
9,622.66
1,151.29
445.00
514.38
287.25
96.19
933.70
50.00
14,815.00
102.20
570.00
229.59
3,200.00
Annual Contribution -Research Program
Joint GWRS Project J-36
Natural Gas
Membership -Joint Powers Agreement
Power
Underground Petroleum Storage Tank Fee & FY 04-05 Sales Tax Return
Environment Assessment Division Meeting Registration
Travel Services
Paging Service -Airtime, Service & Equipment
Mechanical Parts & Supplies
Telephone Service
Instrument Repairs & Maintenance Services
Training Registration
Janitorial Supplies
lab Parts & Supplies
Reconciliation User Fee Refund Program
Wireless Services
Wage Garnishment
Mechanical Repairs & Maintenance Service
Electrical Parts & Supplies
Plumbing Parts & Supplies
Wage Garnishment
Data Services -Parcel Reports
Wage Garnishment
General Management Admin. Division Meeting Registration
Training Registration
Repairs & Maintenance Services
Training Registration (Construction Management Association of America)
Container Rentals ·
Membership (Calif. Water Environment Assoc.)
Wage Garnishment
Reimbursed Prepaid Employee Medical & Dependent Care
lab Parts & Supplies
Wage Garnishment
Repairs & Maintenance Services -Gates
On-Line Orange County Property Information
lab Parts & Supplies
Vehicle Washing & Waxing Services
Wage Garnishment
Professional Services P2-60
Electrical Parts & Supplies
Freight Services
Misc. Repair & Maintenance Material
Training Registration
Page 1of8 EXHIBITS
8/1012005
<Cll ..
Claims Paid From 07/16/05 to 07/31/05
Warrant No. Vendor
73483 Intergraph Corporation
73484 Internal Revenue Service
73485 Intl. Union of Oper. Eng. AFL-CIO Local 501
73486 Invensys Systems, Inc.
73487 IECOC
73488 John Bell Pool Service
73489 lab Safety Supply, Inc.
73490 John H. Lin
73491 Marden Susco-see Hughes Supply, Inc.
73492 Mayer, Brown, Rowe & Maw, L.L.P.
73493 McMahan Business Interiors
73494 Medlin Controls Co.
73495 Court Order
73496 National Bond & Trust
73497 Neutron Products, Inc.
73498 0 C Tanner Recognition Company
73499 Optio Software, Inc.
73500 Orange County Sheriff
73501 Orange County Tax Collector
73502 OCB Reprographics
73503 OCEA
73504 Peace Officers Council of CA
73505 Praxair Distribution, Inc.
73506 Primary Source Office Furnishings, Inc.
73507 Profit Techniques, Inc.
73508 PCG Industries
73509 R. l. Abbott & Associates
73510 RPM Electric Motors
73511 Seaventures
73512 Court Order
73513 Source Graphics
73514 Southern California Edison
73515 Stockstill Communications
73516 Surveyor Services
73517 SAR BS
73518 SBC
73519 SBC Long Distance
73520 Snap-On Tools/Jesse Gomez
73521 Systems Solution Company
73522 Thompson Industrial Supply, Inc.
73523 TMV Systems Engineering, Inc.
73524 United Parcel Service
73525 United Way
73526 Verizon California
73527 Verne's Plumbing
73528 Waxie Sanitary Supply
H:\dept\fln\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report· 07-31-05
fin/210/lc
Amount
4,259.41
300.00
3,960.06
398.73
22.00
2,560.00
291.98
150.00
360.96
5,000.00
4,878.65
526.52
225.00
3,106.34
3,751.77
1,550.19
872.78
414.86
51.57
9,764.72
659.79
1,656.00
19.80
12,645.94
1,341.49
750.00
3,000.00
648.43
260.00
721.50
800.00
2,199.47
5,000.00
87.39
45.00
732.23
1,655.10
101.61
340.00
4,947.04
1,156.25
988.65
215.00
120.94
5,590.04
971.38
Description
Software Installation, Implementation, Training & Support
Wage Garnishment
Dues Deduction
Instrument Parts & Supplies
Training Registration (Industrial Environmental Coalition of Orange County)
Service Agreement-Admin. Bldg. Atrium Pond
Locks
MeetingfTraining Expense Reimbursement
Plumbing Parts & Supplies
Professional Services -Strategic Planning & Advocacy
Installation of (1) PMO Trailer Workstation
Instrument Parts & Supplies
Wage Garnishment
U.S. Savings Bonds Payroll Deductions
Anionic Polymer Tote
Employee Service Awards Program
Software Maintenance & Support
Wage Garnishment
Real Property Taxes -Rocky Point Pump Station
Printing Service -MO 1/26/00
Dues Deduction
Dues Deduction
Demurrage
Office Furniture
Professional Services -0 & M Manager Coaching
Repairs & Maintenance Services -Drive Shaft
Kern County Biosolids Consulting Services
Repairs & Maintenance Services -limitorque Motor
Lab Parts & Supplies
Wage Garnishment
OCE Wide Format Copier/Printer Maintenance Agreement
Power
Professional Services -Strategic Advice & Counsel Re Great Park
Office Supplies
Training Registration
Telephone Services
Long Distance Telephone Services
Small Tools
Repairs & Maintenance Services -Access Control/CCTV Security System
Mechanical Parts & Supplies
Software Maintenance
Parcel Services
Employee Contributions
Telephone Services
Service Contract-Testing & Cert. Backflow Devices at Pits. 1 & 2 & Pump Sta.
Janitorial Supplies
Page 2 of 8
EXHIBITS
8/10/2005
Claims Paid From 07/16/05 to 07/31/05
Warrant No.
73529
73530
73531
73532
73533
73534
73535
73536
73537
73538
73539
73540
73541
73542
73543
73544
73545
73546
73547
73548
73549
73550
73551
73552
73553
73554
73555
73556
73557
73558
73559
73560
73561
73562
73563
73564
73565
73566
73567
73568
73569
73570
73571
73572
73573
73574
Vendor
Weston Solutions, Inc.
Xerox Corporation
Court Order
1-800-Conference(R)
State Board of Equalization
Mark C. Narciso
Adam A. Nazaroff
State Board of Equalization
Aquarium of the Pacific
ISA
State Board of Equalization
Air Products & Chemicals
Black & Veatch Corporation
Blue Cross of California
Brown & Caldwell
California Soil Products
Camp Dresser & McKee, Inc.
City of Fountain Valley
Delta Dental
Dudek & Associates, Inc.
Earth Tech, Inc.
Eco Oxygen Technologies, l.l.C.
Garden Grove Sanitary District
Jamison Engineering Contractors, Inc.
Kemiron Companies, Inc.
Lee & Ro, Inc.
Malcolm Pirnie, Inc.
Mellon Trust
Occidental Energy Marketing, Inc.
Orange County Water District
Pioneer Americas, Inc.
Southern California Edison
Synagro Technologies, Inc.
Tula Ranch/Magan Farms
U.S. Metro Group, Inc.
Waste Markets Corp.
Weston Solutions, Inc.
DKG Construction
J F Shea Construction, Inc.
J R Filanc Construction
Margate Construction, Inc.
Morrow-Meadows Corp.
Southern Contracting Company
Able Scale Repair
Agilent Technologies, Inc.
Airco Filter Service
H:\depl\fln\EXCEL.dla\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report • 07-31-05
fin1210nc
Amount
1,350.00
941.52
597.50
640.12
350.00
207.88
177.00
350.00
116.55
85.00
850.00
49,000.00
123,351.73
364,698.63
299,754.69
59,085.55
122,818.65
35,566.11
58,424.38
26,456.96
103,144.67
37,800.00
91,973.52
114,322.65
175,512.98
74,219.81
231,130.20
26,234.65
142,598.68
85,160.05
426,261.98
192,035.22
101.195.97
299,912.06
29,222.50
76,910.54
28,110.00
32,243.40
1,497, 172.37
1,004,277.00
229,776.00
45,475.00
50,383.00
769.00
6,264.00
678.83
Description
Outside Laboratory Services
Copier Supplies
Wage Garnishment
Telephone Conference Call
Annexation Fee
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Annexation Fee
Reimbursable Employee Activity Expense
Membership
Annexation Fee
0 & M Agreement Oxy Gen Sys MO 8-8-89
Engineering Services 5-58, J-71-3 & J-77
Medical Insurance Premium
Professional Services P2-90
Residuals Removal MO 3-29-95
Engineering Service J-71-8
Water Use
Dental Insurance Plan
Professional Services P2-68
Professional Services P1-100
Professional Services -Super Oxygenation System -Seal Beach Pump Station
Cooperative Projects Reimbursement Program
Repairs & Maintenance Services -Slater Pump Sta. & SARI Line Repairs
Ferric Chloride MO 9-27-95
Professional Services 5-49, 5-50, 5-51, 5-52 & P2-47-3
Professional Services P2-80 & 11-26
Investment Custodian Bank
Natural Gas for CenGen/CoGen
GAP Water Use
Sodium Hypochlorite
Power
Residuals Removal MO 3-29-95
Residuals Removal MO 3-29-95
Janitorial & Floor Maintenance at Plants 1 & 2
Maint. Agreement -Grit & Screenings Removal & Digester Bed Mat'I. Removal
Outside Lab Services -Core Ocean Monitoring Program
Construction FE04-05
Construction J-77 & J-35-2
Construction P1-76
Construction P1-37
Construction P2-47-3 & FE03-24
Construction J-33-1
Loading Scales Quarterly Inspection & Certification for Pits. 1 & 2
Training Registration
Filters
Page 3 of 8 EXHIBITS
8/10/2005
.. ,.
Claims Paid From 07/16/05 to 07/31/05
Warrant No.
73575
73576
73577
73578
73579
73580
73581
73582
73583
73584
73585
73586
73587
73588
73589
73590
73591
73592
73593
73594
73595
73596
73597
73598
73599
73600
73601
73602
73603
73604
73605
73606
73607
73608
73609
73610
73611
73612
73613
73614
73615
73616
73617
73618
73619
73620
Vendor
Airgas Safety, Inc.
Alta-Robbins, Inc.
American Fildelity Assurance Company
American Training Resources, Inc.
Analysts, Inc.
Ashbrook Corporation
AssurX. Inc.
Awards & Trophies Company
AIM, Inc.
AKM Consulting Engineers
All American Sewer Tools
American Telephone & Telegraph Corp.
Baker Tanks
Bar Tech Telecom, Incorporated
Basic Chemical Solutions, L.L.C.
Battery Specialties
BioMerieux Vitek, Inc.
Boyle Engineering Corporation
BC Wire Rope & Rigging
BMC: Business Machines Consultants, Inc.
California Auto Collision
California Rebuild America Coalition
California Relocation Services, Inc.
Caltrol, Inc.
Charts, Inc.
Cole-Parmer Instrument Co.
Columbia Analytical Services, Inc.
Communications Supply Corp.
Computer Protection Technology, Inc.
Condition Monitoring Solutions
Consolidated Elect. Distributors, Inc.
Consumers Pipe & Supply Co.
Control Factors -Seattle, Inc.
Corporate Express
County of Orange
County Wholesale Electric Co.
Culligan of Orange County
CH2MHill
CR&R, Inc.
David's Tree Service
De Guelle Glass Co., Inc.
Dell Computer
Dharma Consulting
Dionex Corporation
Dunn-Edwards Corporation
OHL Express (USA), Inc.
H:\dept\fln\EXCEL.dla\220\APSHARE\Claims Paid Report\05-06\Clalms Paid Report -07-31-05
fin/210/lc
Amount
4,101.95
745.28
200.40
538.31
1,025.46
4,337.97
5,513.00
89.50
3,375.57
13,650.00
9,463.48
25.74
560.00
2,220.49
19,322.26
324.33
1,418.02
23,019.25
880.05
73.29
1,826.69
5,000.00
112.50
21,889.06
363.04
404.18
270.00
649.61
5,393.53
2,450.00
6,970.75
3,179.33
994.80
3,823.89
106.50
889.27
42.80
4,576.74
1,935.00
7,800.00
1,034.40
24,866.55
7,500.00
343.96
53.81
57.54
Description
Safety Supplies
Instrument Supplies
Employee Cancer Insurance
Safety Videos
Oil Test Kit & Analyses
Filter Press Parts & Supplies
CA TWEB Software Maintenance
Awards & Trophies
Ice Machine
Prof. Services -Part-Time Dig Alert Technician
Warthogs, Nozzles, and Root Cutters w/Service Oil & Maintenance Kit
Telephone Service
Tank Rentals
Telephone Parts & Supplies
Sodium Bisulfite & Sodium Hydroxide
Batteries
Lab Parts & Supplies
Professional Services 1-2-4
Miscellaneous Hardware
Multifunctional Copier/Scanner Maintenance Agreement
Repairs & Maintenance-V-495
Membership
Office Files Moving/Relocation Services
Valve Assemblies
Charts
Instrument Parts & Supplies
Analysis of Wastewater, Industrial Wastewater & Biosolids
Computer Hardware/Software
Computer Maint. Agreement
Training Registration
Electrical Parts & Supplies
Plumbing Parts & Supplies
Filters
Office Supplies
Maint. Agreement -Repair/Installation of Base, Handheld & Vehicle Radios
Electrical Parts & Supplies
Maint. Agreement -Cen Gen Water Softener System
Professional Services J-40-7
Container Rentals
Tree Maint. Service
Window Hardware
(25) Desktop P.C.'s
Prof. Services -Strategic Planning & EMT Development
Lab Parts & Supplies
Paint Supplies
Freight Services
Page 4 of 8
EXHIBITS
8/1012005 . .. ..
Claims Paid From 07/16/05 to 07/31/05
Warrant No.
73621
73622
73623
73624
73625
73626
73627
73628
73629
73630
73631
73632
73633
73634
73635
73636
73637
73638
73639
73640
73641
73642
73643
73644
73645
73646
73647
73648
73649
73650
73651
73652
73653
73654
73655
73656
73657
73658
73659
73660
73661
73662
73663
73664
73665
73666
Vendor
Employee Benefits Specialists, Inc.
Enchanter, Inc.
Environmental Express
Environmental Resource Association
Environmental Science Associate (ESA)
Ewing Irrigation Industrial
Excel Door & Gate Company, Inc.
ENS Resources, Inc.
Executive Communications
FedEx Corporation
First Metro Appraisals
Fisher Scientific
Fluid Handling Systems
Foodcraft Coffee & Refreshment Services
Forkert Engineering & Surveying, Inc.
Fountain Valley Paints, Inc.
Franklin Covey
Frost Engineering Services Co.
Fry's Electronics
Future Electronics
Frost Company
Ganahl Lumber Company
Garland Manufacturing Co.
Garratt-Callahan Company
Goldenwest Window Service
Grainger, Inc.
Great Pacific Equipment Co.
Great Western Sanitary Supplies
GE Infrastructure Sensing
Hach c/o Ponton Industries
Hardy Diagnostics
Harrington Industrial Plastics, Inc.
Home Depot Credit Services
Horizon Technology
Hub Auto Supply
HI Standard Automotive
Industrial Distribution Group
Industrial Metal Supply
Industrial Threaded Products, Inc.
lnnerline Engineering
Inorganic Ventures, Inc.
Intergraph Corporation
Interstate Batteries of Cal Coast
Iron Mountain
Irvine Ranch Water District
ISA
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05·06\Claims Paid Report-07-31-05
fin/210/lc
Amount
630.35
7,700.00
195.17
3,170.27
7,524.80
197.73
1,056.65
10,000.00
13,982.39
118.49
4,500.00
4,680.98
1,816.67
468.20
585.00
149.70
148.37
179.74
537.23
215.07
846.25
644.35
543.19
11,490.91
120.00
1,324.71
1,938.35
41.48
9,486.48
800.31
566.54
5,988.86
293.70
244.79
884.08
56.50
3,180.00
316.89
2,376.26
22,493.11
374.68
2,800.00
562.94
91.13
83.35
845.00
Description
Reimbursed Prepaid Employee Medical & Dependent Care
Ocean Monitoring & Outfall Inspection & Maintenance
Lab Parts & Supplies
Lab Parts & Supplies
Professional Services J-40-5 & J-40-1 O
Plumbing Parts & Supplies
Repairs & Maintenance Services -Conference Rooms A & B Moveable Wall
Professional Services -Legislative Advocate
Professional Services -Unifying Strategies Program
Freight Services
Appraisal Services -Possible North County Yard Site
Lab Parts & Supplies
Pump Supplies
Meeting Supplies
Surveying Services P1-37
Paint Supplies
Office Supplies
Control Valve
Computer Supplies
Electrical Parts & Supplies
Repairs & Maintenance Services -No. 2 Auger
Lumber/Hardware
Mechanical Parts & Supplies
Chemicals
Miscellaneous Landscape Maintenance
Electrical Parts & Supplies
Repairs & Maintenance -V-420, 28-Ton Crane
Janitorial Supplies
Software/Hardware
Lab Parts & Supplies
Lab Parts & Supplies
Plumbing Parts & Supplies
Misc. Repair & Maintenance Material
Lab Parts & Supplies
Vehicle Parts & Supplies
Automotive Parts & Supplies
Mechanical Parts, Supplies & Small Tools
Metal
Mechanical Parts & Supplies
CCTV Videoing of Trunkline Sewers
Lab Parts & Supplies
Software Consulting Services -Installation, Implementation & Support
Batteries for Vehicles & Carts
Bid Document Storage Fees P1-37
Water Use
Training Registration
Page 5 of 8 EXHIBITS
811012005
Claims Paid From 07/16/05 to 07/31/05
Warrant No.
73667
73668
73669
73670
73671
73672
73673
73674
73675
73676
73677
73678
73679
73680
73681
73682
73683
73684
73685
73686
73687
73688
73689
73690
73691
73692
73693
73694
73695
73696
73697
73698
73699
73700
73701
73702
73703
73704
73705
73706
73707
73708
73709
73710
73711
73712
Vendor
Jay's Catering
Larry J. Jones
Keith Boger
Komex H20 Science, Inc.
Kennie K. Gallery
L & N Uniform Supply Co.
Langevin Leaming Services, Inc.
League Of CA Cities-Remit Addr
Lexis-Nexis
Lord & Sons, Inc.
Lucci's Gourmet Foods, Inc.
LINJER
Managed Health Network
MassMutual Michel Financial Group
McMaster-Carr Supply Co.
Medlin Controls Co.
Mid-West Associates
Siemens Energy & Automation
Moreland & Associates
Motion Industries, Inc. CA 55
National Filter Media Corporation
National Plant Services, Inc.
Neal Supply Co.
Newark Electronics
Ninyo & Moore Corporate Accounting
NRG Thermal Services, L.L.C.
0 C Tanner Recognition Company
Office Depot Business Services Div.
Omni Western Incorporated
OneSource Distributors, Inc.
Oracle Corporation
Orange County Pump Co.
The Orange County Register
Orange County Vector Control District
Orange Courier
Oxygen Service Company
OCB Reprographics
P.L. Hawn Company, Inc.
Pacific Mechanical Supply
Parker Supply Company
Parsons Water & Infrastructure, Inc.
PerkinElmer LAS
Parma Pure, Inc.
Praxair Distribution, Inc.
Pre-Paid Legal Services, Inc.
Project Management Institute
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-07-31-05
fin/210/lc
Amount
1,533.01
49.50
3,085.00
95.00
29.09
1,364.31
7,334.70
5,000.00
54.37
158.01
108.29
5,097.19
1,041.92
299.88
1,768.64
151.67
370.15
1,881.15
6,251.03
951.13
1,525.52
11,230.00
134.49
797.45
5,825.00
8,636.84
121.22
3,041.07
37.69
3,593.88
10,055.70
281.53
104.99
139.84
10.90
4,536.02
1,965.99
2,135.18
1,124.20
9,189.06
10,302.64
102.65
569.66
27.48
578.00
154.00
Description
Meeting Expenses
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Professional Services P1-98
Picture Framing Service
OCSD Polo Shirts with National Biosolids Partnership EMS Logo
Training Registration
General Management Admin. Division Meeting Registration
Books & Publications
Mechanical Parts & Supplies
Meeting Expense
Professional Service -DART MO 9-22-99
Employees Assistance Program
Executive Disability Plan Premium
Mechanical Parts & Supplies
Instrument Parts & Supplies
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Auditing Services MO 3-8-95
Mechanical Parts & Supplies
Filter Press Belts
Vacuum Truck Services
Plumbing Supplies
Electrical Parts & Supplies
Professional Services -Soils, Concrete & Other Materials Testing, Various Locations
Check Valve
Employee Service Awards Program
Office Supplies
Tools
Electrical Parts & Supplies
Software Update & Maintenance
Pump Parts & Supplies
Books & Publications
Pest Control
Courier Services
Specialty Gases
Printing Service -MO 1 /26/00
Electrical Parts & Supplies
Plumbing Parts & Supplies
Mechanical Parts & Supplies
Professional Services J-35-1
Lab Parts & Supplies
Filter
Demurrage
Employee Legal Service Insurance Premium
Membership
Page 6of8
EXHIBITS
8/10/2005 •·
Claims Paid From 07/16/05 to 07/31/05
Warrant No.
73713
73714
73715
73716
73717
73718
73719
73720
73721
73722
73723
73724
73725
73726
73727
73728
73729
73730
73731
73732
73733
73734
73735
73736
73737
73738
73739
73740
73741
73742
73743
73744
73745
73746
73747
73748
73749
73750
73751
73752
73753
73754
73755
73756
73757
73758
Vendor
Pro pipe
Prudential Overall Supply
Rainin Instrument, L.L.C.
Reliastar Bankers Security Life Ins.
Restek Corporation
Retrofit Express
Rolls-Royce Energy Systems, Inc.
ITT Shared Services
RBF Engineers
RD Tech Instruments
RM Automation c/o RM Controls
RMS Engineering & Design, Inc.
Safe-T-Rack Systems, Inc.
Sancon Engineering, Inc.
Science Applications Intl., Corp.
Scott Specialty Gases. Inc.
City of Seal Beach Finance Dept.
Shureluck Sales & Engineering
Sigma-Aldrich, Inc.
Smith Pipe & Supply, Inc.
Southern California Edison
Southern Counties Lubricants
Sparkletts
Spex Certiprep, Inc.
Standard and Poors Corp.
Stanley Steamer International, Inc.
Steven Enterprises, Inc.
Summit Steel
Sunset Industrial Parts
Super Chem Corporation
Technical Service Group, Inc.
SBC
SBC/MCI
SKC-West, Inc.
SPEC Services, Inc.
Stratus Environmental, Inc.
T&T Valve and Instrument
T echno Coatings
Terminix International
The JG Press, Inc.
The Walking Man, Inc.
Thermo Electron Corp.
Thermo Finnigan, L.L.C.
Thompson Industrial Supply, Inc.
ThyssenKrupp Elevator
Tilson & Associates, L.L.C.
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -07-31-05
fin/210nc
Amount
2,973.26
1,549.00
508.37
8,756.27
800.00
900.00
647.62
25.75
17,506.27
505.07
264.20
2,560.00
649.35
8,000.00
4,779.20
3,476.18
249.00
1,853.80
276.29
1,854.53
31.94
154.30
2,143.45
358.40
5,000.00
214.00
488.72
1,033.99
421.73
347.55
1,381.60
1,212.62
2,767.69
1,168.82
15,100.60
3,515.00
2,103.81
4,680.00
1,640.00
129.00
675.00
1,782.26
23,037.50
2,089.23
955.50
4,800.00
Description
CCTV Sewerline Video Inspection
Uniforms & Related Articles
Lab Parts & Supplies
Employee Life Ins. Premium, Short-Term Disability & Cancer Ins. Payroll Deductions
Training Registration
Installation of Urinals In Administration Building
Electrical Parts & Supplies
Instrument Parts & Supplies
Engineering Services 2-24-1
Instrument Parts & Supplies
Instrument Supplies
Professional Services -Buoyancy Investigation -Oxygen Plant Tanks
Lab Parts & Supplies
Construction -Rehabilitation of Small Diameter Sewer Pipe
Ocean Monitoring MO 6-8-94
Specialty Gases & Lab Supplies
Water Use
Mechanical Parts & Supplies
Lab Parts & Supplies
Landscape Irrigation Supplies
Power
Grease
Drinking Water/Cooler Rentals
Lab Parts & Supplies
COP Analytical Services
Carpet Cleaning Services
Office Supplies
Metal
Mechanical Parts & Supplies
Chemicals
SCADA System VAX Service Agreement
Telephone Services
Telephone Services
Instrument Parts & Supplies
Engineering Services J-33-1
Groundwater Monitoring
Sewage Combination Air Release & Vacuum Valve
Painting Services -OSHA Pipe Color Correction
Pest Control
Books & Publications
Public Notice Printing & Mailing Services Various Projects -7-41
Lab Parts & Supplies
Instrument Maintenance & Service
Mechanical Parts & Supplies
Elevator Maintenance
On-Site Training -Flush Truck Training
Page 7 of 8 EXHIBITS
8/1012005
Warrant No.
73759
73760
73761
73762
73763
73764
73765
73766
73767
73768
73769
73770
73771
73772
73773
73774
73775
73776
73777
73778
73779
73780
73781
73782
73783
73784
73785
73786
73787
Vendor
Townsend Public Affairs
Truck & Auto Supply, Inc.
TSCM Corporation
Underground Service Alert of So. Calif.
United Parcel Service
United States Plastic Corp.
Valverde Construction, Inc.
Verizon California
Village Nurseries
Vision Service Plan-(CA)
Vortex Corporation
VWR Scientific Products Corporation
Wally Machinery and Tool Supply, Inc.
West Coast Safety Supply Co.
West-Lite Supply Company, Inc.
Westflex Industrial
Xerox Corporation
Yale/Chase Materials Handling, Inc.
YSI Massachusetts
California Bank & Trust
Nicholas J. Arhontes
Pamela A. Koester
Michael D. Moore
Jamiann M. Questa
Joanne Ward
Boeing Company, The
County of Orange -Auditor Controller
County of Orange -Auditor Controller
Orange County Sanitation District
Total Accounts Payable -Warrants
Payroll Disbursements
38353 -38442 Employee Paychecks
38443 -38446 Employee Paychecks
113949 -114501 Direct Deposit Statements
Total Payroll Disbursements
Wire Transfer Payments
OCSD Payroll Taxes & Contributions
Union Bank of California
U.S. Bank
U.S. Bank
Total Wire Transfer Payments
Total Claims Paid 07/16/05 -07/31/05
Claims Paid From 07/16/05 to 07/31/05
Amount
5,000.00
1,273.36
1,700.00
1,589.00
27.36
41.73
9,105.88
80.20
287.99
10,008.00
1,444.04
3,972.88
158.88
436.38
759.25
209.61
14,684.82
35.34
219.86
2,652.00
119.00
347.08
243.70
226.86
130.00
579.81
330.00
990.00
676.36
$12,495,533.73
$ 148,296.11
23,951.79
1,098,287.32
$ 1,270,535.22
$ 7,483,022.87
6,956, 729. 73
9,536,948.82
1, 145,652.55
$25, 122,353.97
$38,888,422.92
Description
legislative & Executive Advocate for Grant Funding
Automotive Supplies
Street Sweeping Services
Membership -Underground Service Alert Identification/Notification Services
Parcel Services
Plastic Containers
Construction -Emergency Street Repairs -Costa Mesa
Telephone Services
landscaping Supplies
Vision Service Premium
Door Repair
lab Parts & Supplies
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Electrical Parts & Supplies
Mechanical Parts & Supplies
Copier lease & Supplies
Automotive Parts & Supplies
Lab Parts & Supplies
Construction J-33-1 A, Retention
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
Reconciliation User Fee Refund Program
Administration Fee -Adjustments to Property Tax Bills
Administration Fee -Adjustments to Property Tax Bills
Petty Cash Reimb.
Biweekly Payroll 07/20/05
Retirement, Retro and Adjustment Paychecks 07/21/05 to 7/28/05
Biweekly Payroll 07 /20/05
Biweekly Payroll 7 /20/05
July Interest for Series 2003A Certificates of Participation
July Principal & Interest for 1990-92 Advance Refunding Certificates of Participation
July Principal & Interest for 2000 A & B Refunding Certificates of Participation
H:\depl\fin\EXCEL.dla\220\APSHARE\Claims Paid Reporl\05-06\Claims Paid Report -07-31-05
fln/210/lc Page 8 of 8
EXHIBITB
8/10/2005
BOARD OF DIRECTORS Meeting Date To Bel. of Dir.
09/28/05
AGENDA REPORT Item Number Item Number
Orange County Sanitation District
FROM: Michael D. White, Acting Director of Finance!freasurer
Originator: Lenora Crane, Executive Assistant
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION
DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
CONFLICT OF INTEREST NOTIFICATION
Pursuant to Government Code Section 84308, you are requi red to disclose any
campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving the Orange County Sanitation District. Further, you may
not participate in the decision making process to award a contract to such party.
For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with the District.
8
In general, you must disclose the basis of the conflict by identifying the name of the firm
or individual who was the contributor.
For the specifics of Government Code Section 84308, please see your Director's
Handbook or call the office of General Counsel.
SUMMARY
See attached listing.
PRIOR COMMITTEE/BOARD ACTIONS
NIA
ATTACHMENTS
1. Copies of Claims Paid reports from 08/01 /05 to 08/15/05 and 08/16/05 to 08/31 /05
C:\Documents and Settings\kawai\Local Settings\Temporary Internet Files\OLK72\ltem B ClaimsPaid.doc
Revised: 06/04/03
Claims Paid From 08/01/05 to 08/15/05
Warrant No. Vendor
Accounts Payable -Warrants
73788 City of Newport Beach
73789 National Plant Services, Inc.
73790 Southern California Edison
73791 Woodruff, Spradlin & Smart
73792 American Telephone & Telegraph Corp.
73793 Agilent Technologies, Inc.
73794 Airgas Safety, Inc.
73795 American Red Cross
73796 APTUS&C
73797 AWSI
73798 Brown & Caldwell
73799 Business Objects Americas
73800 Beverly Houwing
73801 Cal-Glass, Inc.
73802 Martin Boyer Co., Inc. c/o Cambridge
73803 Casual Gourmet
73804 Coast Fire Equipment
73805 Court Order
73806 Compressor Components of California
73807 Consumers Pipe & Supply Co.
73808 County of Orange
73809 Court Trustee
73810 CASA
73811 David's Tree Service
73812 Dell Direct Sales, L. P.
73813 Department of Child Support Services
73814 Dr. Harvey Goldstone
73815 Edinger Medical Group, Inc.
73816 Employee Benefits Specialists, Inc
73817 Court Order
73818 Express Lens Lab
73819 FedEx Corporation
73820 Fisher Scientific Company
73821 Franchise Tax Board
73822 Fry's Electronics
73823 City of Fullerton
73824 General Petroleum
73825 Gierlich-Mitchell, Inc.
73826 Goldenwest Window Service
73827 Government Finance Officers Association
73828 Graybar Electric Company
73829 H. Fontaine, Ltd.
73830 Hampton Tedder Technical Services
73831 Harrington Industrial Plastics, Inc.
73832 High Impact Priority Training
73833 City of Huntington Beach
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report· 08-15-05
fin/210/lc
$
Amount
80,000.00
37,587.50
69,238.76
77,310.32
208.42
4,376.00
90.19
345.00
249.00
33.00
200.00
12,594.96
950.00
475.76
6,625.00
50.10
424.04
150.00
8,690.00
730.05
150.00
454.49
375.00
3,050.00
6,044.32
188.50
440.00
4,280.00
9,608.51
445.00
4,952.00
44.88
170.29
50.00
344.77
137.14
17,691.52
4,299.23
880.00
55.00
1,437.20
3,375.84
9,536.04
503.19
1,920.00
12,736.14
Description
Reimbursement Agreement -Sewer & Storm Drain Rehabilitation
CCTV Sewerline Inspection -Various Locations
Power
Legal Services MO 7-26-95
Long Distance Telephone Service
Training Registration
Chemicals
CPR Training & Miscellaneous Supplies
Membership
Department of Transportation Program Management & Testing
Notices & Ads
Software Maintenance & Support
Software Consulting -Adobe Acrobat for lntraneUlnternet
Lab Parts & Supplies
Prof. Services -Workers' Compensation Claims
Meeting Expenses J-4 7
Annual Fire Extinguisher Inspection & Servicing at Pits. 1 & 2 and Pump Stations
Wage Garnishment
Repairs & Maintenance Service -Engine lgnitors
Plumbing Parts & Supplies
Wage Garnishment
Wage Garnishment
General Management Administration Division Meeting Registration
Tree Maint. Service
(3) Latitude Notebooks & Accessories
Wage Garnishment
Safety Glasses
Medical Screenings
Reimbursed Prepaid Employee Medical & Dependent Care
Wage Garnishment
Safety Glasses
Freight Services
Lab Parts & Supplies
Wage Garnishment
Computer Supplies
Water Use
Oil/Fuel -Cen Gen
Mechanical Parts & Supplies
Miscellaneous Landscape Maintenance
Publication
Electrical Parts & Supplies
Mechanical Parts & Supplies
Electrical Parts & Supplies
Plumbing Supplies
On-Site Training -Boom Lift & Scissor Lift
Water Use
Page 1of8 EXHIBIT A
8/29/2005
Warrant No.
73834
73835
73836
73837
73838
73839
73840
73841
73842
73843
73844
73845
73846
73847
73848
73849
73850
73851
73852
73853
73854
73855
73856
73857
73858
73859
73860
73861
73862
73863
73864
73865
73866
73867
73868
73869
73870
73871
73872
73873
73874
73875
73876
73877
73878
73879
73880
Vendor
Hanson Bridgett
Industrial Distribution Group
Industrial Metal Supply
Intelligence Press, Inc.
Internal Revenue Service
IBM
Intl. Union of Oper. Eng. AFL-CIO Local 501
Johnstone Supply
Mesa Consolidated Water District
Mid-West Associates
Court Order
National Bond & Trust
Nextel Communications
NRG Thermal Services, L.L.C.
Orange County Sheriff
Orange Fluid System Technologies. Inc.
Oxygen Service Company
OCAIHA -Orange County American Indus.
OCB Reprographics
OCEA
01 Analytical
Olson Technologies. Inc.
Peace Officers Council of CA
Primary Source Office Furnishings, Inc.
PFE International, Inc.
Rainin Instrument, LLC
Restek Corp.
Scott Specialty Gases, Inc.
Sheshunoff
Shureluck Sales & Engineering
Siemens
Sigma-Aldrich, Inc.
Skalar, Inc.
Court Order
SoftChoice
Spex Certiprep, Inc.
Summit Steel
Sunset Industrial Parts
SC Fuels
SKC-West, Inc.
T&T Valve and Instrument
Terminix International
Tony's Lock & Safe Service & Sales
Traffic Control Service, Inc.
US Filter Corp.
United Parcel Service
United Way
H:\dept\lin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-08-15-05
fin/210nc
Claims Paid From 08/01/05 to 08/15/05
Amount
9,269.13
488.11
91.81
1,455.00
300.00
5,051.22
3,919.06
45.58
14.41
15,881.50
225.00
2,938.57
1,013.89
1,889.05
442.51
1,291.46
2,731.46
50.00
1,049.70
622.79
109.91
4,486.88
1,629.00
2,985.75
273.54
759.24
533.34
61.09
384.90
801.58
4,304.62
385.87
1,397.21
721.50
20,637.38
307.35
298.84
573.49
1,517.32
253.26
3,156.68
175.00
747.77
1,204.11
120.25
58.75
195.00
Description
Legal Services Re Establishing OCSD Replacement Benefits Plan
Mechanical & Small Tool Supplies
Metal
Publication
Wage Garnishment
Maintenance Agreement AS-400
Dues Deduction
Electrical Parts & Supplies
Water Use
Pump Parts & Supplies
Wage Garnishment
U.S. Savings Bonds Payroll Deductions
Cellular Phones & Air Time
Mechanical Parts & Supplies
Wage Garnishment
Plumbing Parts & Supplies
Lab Parts & Supplies
Membership
Printing Service -MO 1/26/00
Dues Deduction
Lab Parts & Supplies
Mechanical Parts & Supplies
Dues Deduction
Office Furniture
Software Maintenance -Mail Manager lntellitouch System
Lab Parts & Supplies
Lab Parts & Supplies
Demurrage
Publication
Mechanical Parts & Supplies
Instrument Parts & Supplies
Lab Parts & Supplies
Lab Parts & Supplies
Wage Garnishment
Software
Lab Parts & Supplies
Metal
Mechanical Parts & Supplies
Diesel Fuel
Instrument Parts & Supplies
Valves
Pest Control
Locks & Keys
Traffic Safety Vests
Service Agreement-0.1. Water System at Plants 1 & 2
Parcel Services
Employee Contributions
Page 2 of 8
EXHIBIT A
8/29/2005
Claims Paid From 08/01/05 to 08/15/05
Warrant No. Vendor
73881 Valley Detroit Diesel Allison
73882 VWR Scientific Products Corporation
73883 West-Lite Supply Company, Inc.
73884 Western State Controls
73885 WEF
73886 Xerox Corporation
73887 Court Order
73888 Yokogawa Corp. of America
73889 Peter Cheffs
73890 Andrew H. Nau
73891 George L. Robertson
73892 James Carter & COSTCO
73893 Orange County Sanitation District
73894 Black & Veatch Corporation
73895 Brown & Caldwell
73896 Cooper Cameron Corporation
73897 Dudek & Associates, Inc.
73898 Fluor Enterprises, Inc.
73899 Hill Brothers
73900 IPMC c/o Parsons
73901 Kemiron Companies, Inc.
73902 Malcolm Pirnie, Inc.
73903 MetLife Life Insurance Company
73904 MWH Americas. Inc.
73905 Pacific Investment Management Co.
73906 Partners Consulting Services
73907 Pioneer Americas. Inc.
73908 Polydyne. Inc.
73909 RBF Consulting
73910 Southern California Edison
73911 Tule Ranch/Magan Farms
73912 U.S. Peroxide, L.L.C.
73913 ARB, Inc.
73914 Kiewit Pacific Co.
73915 Union Bank of California
73916 Able Scale Repair
73917 Absolute Standards, Inc.
73918 AccuStandard
73919 Advance Business Graphics
73920 Agilent Technologies. Inc.
73921 Air & Waste Management Assoc.
73922 Air Liquide America Corporation
73923 Airgas Safety, Inc.
73924 American Concrete Institute
73925 Analysts, Inc.
73926 Aquarium Doctor
73927 Arch Wireless
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -08-15-05
nn121onc
Amount
320.56
1,947.16
8.90
2,829.20
139.00
256.93
597.50
2,596.78
104.00
232.94
755.00
1,948.99
1,018.15
731,271.91
170,360.79
27,383.75
51,760.25
33,881.44
39,657.45
1, 175, 149.00
96,329.25
481,993.48
36,477.10
50,714.92
156, 173.00
185,340.00
183,136.85
85,056.58
43,479.23
25,000.00
250,291.18
235,712.26
1,526,283.94
148,230.00
164,971.80
430.00
75.00
569.65
377.02
1,073.32
165.00
949.36
2,146.98
163.50
861.54
106.79
1,094.62
Description
Fuel & Oil Filters
Lab Parts & Supplies
Electrical Supplies
Electrical Parts & Supplies
Membership -Water Environment Federation
Copier Lease
Wage Garnishment
Instrument Supplies
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Employee Computer Loan Program
Petty Cash Reimb.
Engineering Services P1-76 & P1-102
Professional Services P2-91 & CMOM-WDR
Engine Parts & Supplies
Engineering Services 2-68
Engineering Services J-84
Chemicals -Odor & Corrosion Control -Newport Trunkline
Professional Services -Integrated Program Management
Ferric Chloride MO 9-27-95
Professional Services 1-1 O & J-79
Group Life, Manager Add'I. Life, Short & Long-Term Disability & Optional Term Life Ins.
Professional Services P2-74 & J-101
Investment Management Service Res. 95-97
FIS On-Site Support -Help Desk & People Soft
Sodium Hypochlorite
Cationic Polymer MO 3-11-92
Engineering Services 07-22-1
Professional Services P1-97
Residuals Removal MO 3-29-95
Odor & Corrosion Control Treatment for Coll. Sys.; Hydrogen Peroxide & Ferrous Chloride
Construction 11-22, 7-36 & 7-41
Construction 5-51
Construction 7-41, Retention
Loading Scale Quarterly Inspection
Lab Parts & Supplies
Lab Parts & Supplies
Printing Services -Business Cards
Lab Parts & Supplies
Membership
Specialty Gases
Safety Supplies
Publication
Oil Test Kit & Analyses
Human Resources Aquarium Service
Paging Service -Airtime, Service & Equipment
Page 3 of 8 EXHIBIT A
8/29/2005
-.
Warrant No. Vendor
73928 Archie Ivy, Inc.
73929 Arens Industries, Inc.
73930 Arizona Instrument
73931 Ashbrook Corporation
73932 Associated Vacuum Tech., Inc.
73933 AssurX, Inc.
73934 Aurora Pictures, Inc.
73935 Awards & Trophies Company
73936 Amtech Elevator Services
73937 APTUS&C
73938 Basic Chemical Solutions, L.l.C.
73939 Battery Specialties
73940 Brenntag Pacific, Inc.
73941 SEC-Building Electronic Controls, Inc.
73942 BMC: Business Machines Consultants, Inc.
73943 Cal-Glass, Inc.
73944 Caltrol, Inc.
73945 Cardlock Fuel Systems, Inc.
73946 Carl Warren & Co.
73947 Carollo Engineers
73948 Casual Gourmet
73949 Charts, Inc.
73950 Coast Fire Equipment
73951 Cole-Parmer Instrument Company
73952 Columbia Analytical Services, Inc.
73953 Consolidated Elect. Distributors, Inc.
73954 Consumers Pipe & Supply Co.
73955 Corporate Express
73956 Corporate Image Maintenance, Inc.
73957 County of Orange -Auditor Controller
73958 County of Orange -Auditor Controller
73959 County of Orange -Auditor Controller
73960 County of Orange -Auditor Controller
73961 County Wholesale Electric Co.
73962 Crane Veyor Corp.
73963 California Sea Grant, UCSD
73964 Careerbuilder
73965 CASA
73966 CCP Industries
73967 Celia Baca
73968 CMAA
73969 Correa, Lou
73970 CS-AMSCO
73971 David's Tree Service
73972 Del Mar Analytical
73973 Delta Packaging Products, Inc.
73974 Dunn-Edwards Corporation
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05·06\Claims Paid Report-08-15-05
fin/210nc
Claims Paid From 08/01 /05 to 08/15/05
Amount
900.00
2,004.15
499.57
3,794.04
116.01
7,579.12
495.00
152.52
1,400.00
66.25
19,392.24
814.01
2,061.91
3,450.00
20,594.17
235.98
15,498.37
17,158.42
300.00
7,819.32
153.33
185.40
594.88
2,758.83
870.00
2,233.10
623.07
8,849.04
168.00
1,865.00
1,300.00
3,356.00
3,832.00
203.35
2,320.00
15.00
1,639.99
375.00
8,984.83
361.78
255.00
179.70
5,653.64
4,500.00
2,410.00
238.49
58.03
Description
Repairs & Maint. Services -Installation of (2) Berms at Plant 1
Instrument Parts & Supplies
Instrument Parts & Supplies
Hydraulic Steering Valves
Air Filters
On-Site Training -CA TWEB Training Re Software Upgrades
Safety Videos
Awards & Trophies
Elevator Maintenance Service
Publication (Association of Public Treasurers of the United States and Canada)
Sodium Bisulfite & Sodium Hydroxide
Batteries
Janitorial Supplies
Fire Alarm System Maintenance & Testing
(2) HP9000 Multifunctional Copiers with Stapler/Slackers & Fuser Units
lab Equipment Service
Mechanical Parts & Supplies -Actuator, Regulator
Fueling District Vehicles at Local Gas Stations
Insurance Claims Administrator
Professional Services P2-60
Meeting Expenses J-73-2
Charts
Annual Fire Extinguisher Inspection & Servicing at Pits. 1 & 2 and Pump Stations
Lab Parts & Supplies
Analysis of Wastewater, Industrial Wastewater & Biosolids
Electrical Parts & Supplies
Plumbing Parts & Supplies
Office Supplies
Custodial Services Spec. No. 9899-09
Underground Storage Tank, Hazardous Material, & State Fees
Underground Storage Tank, Hazardous Material, & State Fees
Underground Storage Tank, Hazardous Material, & State Fees
Underground Storage Tank, Hazardous Material, & State Fees
Electrical Parts & Supplies
Maintenance Agreement-Qrtly. Inspection & Certifications
DVD-CO Data Set -Fisheries Habitat Characterization
Notices &Ads
General Management Administration Division Meeting Registration
Janitorial Supplies
User Fee Refund Regarding Septic Tanks
Training Registration
Meetingffraining Expense Reimbursement
Valves
Tree Maint. Service
Analysis of Biosolids and Wastewater
Lab Parts & Supplies
Paint Supplies
Page 4 of 8
EXHIBIT A
8/29/2005
Claims Paid From 08/01/05 to 08/15/05
Warrant No.
73975
73976
73977
73978
73979
73980
73981
73982
73983
73984
73985
73986
73987
73988
73989
73990
73991
73992
73993
73994
73995
73996
73997
73998
73999
74000
74001
74002
74003
74004
74005
74006
74007
74008
74009
74010
74011
74012
74013
74014
74015
74016
74017
74018
74019
74020
74021
Vendor
OGA Consultants, Inc.
Dick Pickee
Don Davidson
Don Davidson
Edinger Medical Group, Inc.
Enchanter, Inc.
Environmental Resource Association
Ewing Irrigation Industrial
Environmental Biotech, Inc.
Errol Baker
FedEx Corporation
Fisher Scientific
Flo -Systems, Inc.
Fluid Components Intl c/o Ponton
Foodcraft Coffee & Refreshment Services
Franklin Covey
Fry's Electronics
Frans Molina
Frost Company
Garratt-Callahan Company
Gerhardt's, Inc.
Getinge Castle
Goldenwest Window Service
Government Finance Officers Association
Grainger, Inc.
GBC (General Binding Corp)
Graphic Products, Inc.
Haaker Equipment Company
Hach c/o Ponton Industries
Hardy Diagnostics
Harold Primrose Ice
Harrington Industrial Plastics, Inc.
Hello Direct, Inc.
Hilti, Inc.
Home Depot Credit Services
Hub Auto Supply
Hanson Bridgett
Hill's Boat Service
I. D. Industries, Inc.
Industrial Distribution Group
Industrial Metal Supply
Industrial Threaded Products, Inc.
lnterocean Systems, Inc.
Interstate Batteries of Cal Coast
lntratek Computer, Inc.
Inocente Jimenez
Voided Check
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report· 08-15-05
fin/210/IC
Amount
5,655.00
522.50
1,366.36
1,366.36
235.00
5,500.00
1,641.07
508.10
414.95
1,437.79
215.82
646.02
156.08
593.55
461.47
165.66
138.07
1,017.81
6,646.25
1,446.61
7,840.75
1,096.00
1,940.00
164.75
4,259.89
75.64
3,566.76
70.95
1,406.82
260.76
220.00
3,478.43
196.04
922.89
325.97
407.78
312.92
1,409.38
316.57
927.00
892.17
492.95
112.75
982.85
5,942.22
1,017.81
Description
Professional Services -CCTV Data Evaluation & Support
Reconciliation User Fee Refund Program
User Fee Refund Regarding Septic Tanks
User Fee Refund Regarding Septic Tanks
Medical Screenings
Ocean Monitoring & Outfall Inspection & Maintenance
Lab Parts & Supplies
Landscape Irrigation Parts & Supplies
Grease Trap Inspection Kits & Misc. Inspection Supplies
User Fee Refund Regarding Septic Tanks
Freight Services
Lab Parts & Supplies
Pump Supplies
Digital Calibrator
Meeting Supplies
Office Supplies
Computer Supplies
User Fee Refund Regarding Septic Tanks
Professional Services P2-60
Chemicals
Spark Plugs, LSVB
lab Instrument Maintenance Service
Miscellaneous Landscape Maintenance
Publication
Tools and Electrical Parts & Supplies
Stationery & Office Supplies
Graphic Supplies
Misc. Vehicle, Parts, Repairs & Service
Lab Parts & Supplies
Lab Parts & Supplies
Ice For Samples
Plumbing Supplies
Telephone Headsets
Tools
Misc. Repair & Maintenance Material
Vehicle Parts & Supplies
Legal Services Re Establishing OCSD Replacement Benefits Plan
Boat Maintenance Services
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Metal
Mechanical Parts & Supplies
Publication
Batteries for Vehicles & Carts
Network & Server Maintenance
User Fee Refund Regarding Septic Tanks
Page 5 of 8 EXHIBIT A
8/29/2005
. -: .
Claims Paid From 08/01/05 to 08/15/05
Warrant No.
74022
74023
74024
74025
74026
74027
74028
74029
74030
74031
74032
74033
74034
74035
74036
74037
74038
74039
74040
74041
74042
74043
74044
74045
74046
74047
74048
74049
74050
74051
74052
74053
74054
74055
74056
74057
74058
74059
74060
74061
74062
74063
74064
74065
74066
74067
74068
Vendor
J.G. Tucker and Son, Inc.
Jamison Engineering Contractors, Inc.
Kabob Express
Lee & Ro, Inc.
Lucci's Gourmet Foods, Inc.
Larry A. Basquez
M. J. Schiff & Associates, Inc.
Maintenance Products, Inc.
Mandie Motors
Matheson Tri Gas, Inc.
Mc Fadden-Dale Industrial Hardware Co.
Mc Junkin Corp.
McMahan Business Interiors
McMaster-Carr Supply Co.
Motion Industries, Inc. CA 55
MAG-TROL, Inc.
Mikel George
MVA Architects
National Filter Media Corporation
National Plant Services, Inc.
Neal Supply Co.
N~wark Electronics
The Norco Companies
Numatic Engineering
NAS Associates, Inc.
Neutron Products, Inc.
Office Depot Business Services Div.
OneSource Distributors, Inc.
Orange County Hose Company
Orange Courier
Oxygen Service Company
OCB Reprographics
Pacific Mechanical Supply
Parker Supply Company
Parkhouse Tire Co.
Power Design
Praxair Distribution, Inc.
Primary Source Office Furnishings, Inc.
Project Management Institute
Prudential Overall Supply
Pumping Solutions, Inc.
PAC
PCS Express, Inc.
PS Tek, L.L.C.
Q Air California, Div. Pump Engineering
Rainbow Disposal Co.
Red Wing Shoes
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-08-15-05
fin/210flc
Amount
438.20
7,286.00
194.02
6,714.79
43.75
1,073.50
3,087.96
1,502.04
115.00
719.66
502.45
217.76
4,618.01
1,983.15
381.91
2,053.97
551.00
3,700.00
22,250.09
440.00
732.55
1,908.49
539.96
370.91
1,415.00
10,549.42
1,406.09
284.69
35.98
101.78
2,870.01
327.62
2,155.84
20,985.48
1,842.48
8,490.70
15.25
2,375.89
119.00
3,237.88
1,233.79
1,060.77
122.00
1,471.20
4,466.15
2,973.12
252.57
Description
Maint. Serv. -Recertification of Manhole Entry Device, Inspection & Cleaning
Maint. Serv. -Weirs at Primary Basin L, Pit. 2; and Link Seals at Slater Pump Sta.
Meeting Expense -Beach City Qrtly. Mtg.
Professional Services P2-47-3
Meeting Expense
Reconciliation User Fee Refund Program
Professional Services J-106
Mechanical Parts & Supplies
Towing Services
Specialty Gases
Mechanical Parts & Supplies
Plumbing Supplies
Construction -Modification to Safety Division Trailer at Pit. 1
Mechanical & Electrical Supplies, Maintenance Materials & Signs
Plumbing Parts & Supplies
Electrical Parts & Supplies
Reconciliation User Fee Refund Program
North County Yard Site Evaluation
Filter Press Belts
Vacuum Truck Services
Plumbing Supplies
Instrument Supplies
Mail Delivery Service
Mechanical Parts & Supplies
Lab Services
Anionic Polymer
Office Supplies
Electrical Parts & Supplies
Hydraulic Hose Supplies & Parts
Courier Services
Specialty Gases
Printing Service -MO 1 /26/00
Plumbing Supplies
Mechanical Parts & Supplies
Tires
Electrical Parts & Supplies
Demurrage
Office Furniture
Membership
Uniform & Related Articles
Pump
Lab Parts & Supplies
Courier Service
Filter Element
Filters &Oil
Trash Removal
Safety Shoes
Page 6 of 8
EXHIBIT A
8/2912005
Claims Paid From 08/01/05 to 08/15/05
Warrant No.
74069
74070
74071
74072
74073
74074
74075
74076
74077
74078
74079
74080
74081
74082
74083
74084
74085
74086
74087
74088
74089
74090
74091
74092
74093
74094
74095
74096
74097
74098
74099
74100
74101
74102
74103
74104
74105
74106
74107
74108
74109
74110
74111
74112
74113
74114
74115
Vendor
Ricoh Business System
Robicon Corporation
Rockwell Engineering & Equipment Co.
RosemounUUniloc
Royale Cleaners
RMS Engineering & Design, Inc.
RS Hughes Co, Inc.
Rudolph H. Stolz
Safetycare. Inc.
Santa Ana River Flood Protection Agency
Scott Specialty Gases, Inc.
Scottel Voice & Data, Inc.
Seton Name Plate
Shamrock Supply Co., Inc.
Shureluck Sales & Engineering
Sigma-Aldrich, Inc.
Smardan Supply Company -Fountain Valley
Smith Pipe & Supply
Southern California Edison
Southern Counties Lubricants
Spectrum Video, Inc.
Spex Certiprep, Inc.
Stanley Steamer International, Inc.
Summit Steel
Sunset Ford
Sunset Industrial Parts
Technical Service Group, Inc.
SBC
SBC/MCI
SC Fuels
Terminix International
Tetra Tech, Inc.
Texas Analytical Controls, Inc.
Thermo Electron Corp.
Thompson Industrial Supply, Inc.
Time Warner Communication
Tony's Lock & Safe Service & Sales
Traffic Control Service, Inc.
Truck & Auto Supply, Inc.
Tripac Fasteners
US Filter/Polymetrics, Inc.
U.S Postal Service(AMS-TMS)
Ultra Scientific
United Pacific Services, Inc.
United Parcel Service
Vapex, Inc.
Verizon California
H:\depl\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report· 08-15-05
fin/210/lc
Amount
1,623.90
2,117.15
4,420.72
1,795.50
12.00
18,072.45
50.55
4,500.00
538.75
1,400.00
75.00
2,284.80
117.59
3,694.68
83.72
122.25
235.33
589.36
8,213.17
2,201.33
630.00
291.35
95.00
609.22
162.96
117.52
1,381.60
2,420.85
124.13
1,517.32
155.00
605.27
1,326.15
88.04
1,156.98
51.07
158.50
96.98
347.58
862.45
921.83
5,000.00
348.65
22,387.51
43.96
2,630.00
711.16
Description
Color Copier Lease
Factory Repair Service for Waste Pump -Robicon 50 HP VFD
Mechanical Parts & Supplies
Instrument Supplies
Dry Cleaning Services
Engineering Services J-96 & SP-98
Paint Supplies
Training Registration
Safety Videos
Membership -2005-06 FY Dues
Lab Supplies
Telephone System Maintenance
Custom Opti Pipe Markers
Mechanical & Maintenance Supplies
Mechanical Parts & Supplies
Chemicals
Plumbing Parts & Supplies
Plumbing Parts & Supplies
Power
Engine Oil
Professional Services J-84
Lab Parts & Supplies
Carpet Cleaning Services
Metal
Vehicle Parts & Supplies
Mechanical Parts & Supplies
SCADA System VAX Service Agreement
Telephone Services
Telephone Services
Diesel Fuel
Pest Control
Professional Services J-90
Instrument Parts & Supplies
Lab Parts & Supplies
Motor
Cable Services
Locksmith Services
Traffic Safety Equipment Rental
Vehicle Parts & Supplies
Tubing
Maintenance Agreement-D.I. Water Systems at Pits. 1 & 2
Postage
Lab Parts & Supplies
Landscape Maintenance
Parcel Services
Instrument Parts & Supplies
Telephone Services
Page 7 of 8 EXHIBIT A
8/29/2005
.,,_,•
Claims Paid From 08/01/05 to 08/15/05
Warrant No.
74116
74117
74118
74119
74120
74121
74122
74123
74124
74125
74126
74127
74128
74129
74130
74131
74132
74133
74134
74135
74136
74137
Vendor
Verne's Plumbing
Vortex Corp.
Vortox Company
VWR Scientific Products
The Wackenhut Corporation
Waxie Sanitary Supply
Weber Scientific
West-Lite Supply Company, Inc.
Western Switches & Controls, Inc.
Westport Aparatus OBA Breaker Supply
WEF
Wylie Communications
Xerox Corporation
Wells Fargo Bank
Jean L. Bettenhausen
James E. Colston
Michael D. Moore
Douglas M. Stewart
Phillip J. Sullivan
Matt Adams
Orange County Sanitation District
Orange County Public Affairs Assoc.
Total Accounts Payable ·Warrants
Payroll Disbursements
38447 -38550 Employee Paychecks
38551 -38560 Employee Paychecks
114502 -115060 Direct Deposit Statements
Total Payroll Disbursements
Wire Transfer Payments
OCSD Payroll Taxes & Contributions
Lloyd's TSB Bank pie
Societe Generale, NY Branch
JP Morgan Chase Bank
JP Morgan Chase Bank
Chase Manhattan Bank
Total Wire Transfer Payments
Total Claims Paid 08/01/05 • 08/15/05
H:\depl\fln\EXCEL.dta\220\APSHARE\Clalms Paid Report\05-06\Claims Paid Report -08-15-05
fin1210/lc
$
$
$
$
$
$
Amount
551.22
294.00
646.50
2,736.86
22,195.73
26.96
283.14
92.06
284.14
1,145.59
771.00
3,900.00
1,250.24
16.470.00
150.75
320.93
221.01
1,037.18
482.83
95.00
6,933.00
85.00
6,912,438.52
146,444.86
18,679.56
1,059,927 .49
1,225,051.91
642,017.52
67,964.96
53,083.93
4,800,000.00
158,570.53
71,993.63
5,793,630.57
13,931.121.00
Description
Service Contract -Testing & Cert. Backflow Devices at Pits. 1 & 2 & Pump Sta.
Door Repair
Air Filters
Lab Parts & Supplies
Security Services for Pits. 1 & 2
Janitorial Supplies
Lab Parts & Supplies
Electrical Supplies
Electrical Supplies
Electrical Parts & Supplies
Membership -Water Environment Federation
On-Site Training -Advance Writing Workshop
Copier Lease & Supplies
Construction 5-51 & 5-52, Retention
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
MeetingfTraining Expense Reimbursement
Workers' Compensation Account Replenishment for Payments thru 7/31/05
Public Affairs Division Meeting Registration
Biweekly Payroll 08/03/05
Retirement, Vol. Termination, Retros. Idea & OCERS Reimb. 8/02/05 to 8/04/05
Direct Deposit Statements 08/03/05
Biweekly Payroll 08/03/05
Series 1992 COP Standby Purchase Agreement Commitment Fee (05/01/05 to 08/01/05)
Series 1993 Refunding COP's Standby Letter of Credit Commission
Series 1993 Refunding CO P's August 1st Principal Payment
Series 1993 Certificates of Participation July Interest Payment
Series 2000 Refunding COP's Stdby. Purchase Agr. Commitment Fee (05/01/05 -07/31/05)
Page 8 of 8
EXHIBIT A
8/2912005
Claims Paid From 08/16/05 to 08/31/05
Warrant No. Vendor
Accounts Pavable • Warrants
74138
74139
74140
74141
74142
74143
74144
74145
74146
74147
74148
74149
74150
74151
74152
74153
74154
74155
74156
74157
74158
74159
74160
74161
74162
74163
74164
74165
74166
74167
74168
74169
74170
74171
74172
74173
74174
74175
74176
74177
74178
74179
74180
74181
American Express
Blue Cross of California
City of Huntington Beach
County of Orange -Auditor Controller
Kaiser Foundation Health Plan
So. Cal. Gas Company
Accounting Options, Inc.
Airgas Safety, Inc.
American Biofuels, L.L.C.
American Chemical Society
American Water Works Assoc./Water Quality
Appleone Employment Service
Ashbrook Corporation
Autodesk University/Enterprise Events
AQHl, Inc.
American Telephone & Telegraph Corp.
BMC: Business Machines Consultants, Inc.
California Hazardous Services, Inc.
William D. Cassidy
Court Order
Compressor Components of California
Cooper Cameron Corporation
Corporate Express
County of Orange
County of Orange -Auditor Controller
County of Orange -Auditor Controller
Court Trustee
Cummins Allison Corp.
Careerbuilder
Cingular Wireless
Controlled Motion Solutions
Corelink Staffing Services, Inc.
Department of Child Support Services
Ecology Control Industries
Electra-Bond, Inc.
Electrical Reliability Services, Inc.
Employee Benefits Specialists, Inc.
Court Order
Executive Software
FedEx Corporation
Dean M. Fisher
Franchise Tax Board
Gibson, Larry
Godwin Pumps of America, Inc.
$
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -08-31-05
fin/210nc
Amount
31,589.91
356,186.65
303,420.30
47,049.20
68,102.61
36,182.31
8,751.38
5,771.75
885.00
134.00
150.00
471.88
453.33
2,790.00
4,800.00
28.58
199.50
3, 150.00
218.00
150.00
7,236.00
1,877.36
585.28
150.00
3, 140.00
3,397.00
454.49
281.27
1,640.02
924.23
524.58
4,729.20
188.50
17,510.94
20,984.31
1,470.00
10,261.61
445.00
1, 107.89
176.13
150.00
50.00
899.37
19.21
Description
Purchasing Card Program, Misc. Supplies & Services
Medical Insurance Premium
Cooperative Projects Reimbursement Program
Property Attribute Processing Fee
Medical Insurance Premium
Natural Gas
Temporary Employment Services
Safety Supplies
Bio-Diesel
Membership
Membership
Temporary Employment Services
Belt Press Switch
Planning Division Meeting Registration
Repairs & Maint. -Blower Room
Telephone Service
Multifunctional Copier/Scanner Maintenance Agreement
UST State Water Resources Control Board Testing (SB989)
Meeting/Training Expense Reimbursement
Wage Garnishment
Repairs & Maint. -Cleaning/Testing 32 LSVB Ignition Coils
Lube Oil Pump Out
Office Supplies
Wage Garnishment
2005-06 Preliminary Secured Tax Roll & Cross Reference File
Underground Storage Tank/Hazardous Material Fees
Wage Garnishment
Accounting Equipment Signature "Dies"
Notices & Ads
Wireless Services
Mechanical Parts & Supplies
Temporary Employment Services
Wage Garnishment
Hazardous Waste Disposal
Rebuild Belt Press Rollers
Professional Services -P2-82 & FE03-24
Reimbursed Prepaid Employee Medical & Dependent Care
Wage Garnishment
Annual Software Support -Diskeeper VMS 4705A
Freight Services
Meeting/Training Expense Reimbursement
Wage Garnishment
Employee Computer Loan Program
California Sales Tax
Page 1of11 EXHIBITS
9113/2005
Claims Paid From 08/16/05 to 08/31/05
Warrant No.
74182
74183
74184
74185
74186
74187
74188
74189
74190
74191
74192
74193
74194
74195
74196
74197
74198
74199
74200
74201
74202
74203
74204
74205
74206
74207
74208
74209
74210
74211
74212
74213
74214
74215
74216
74217
74218
74219
74220
74221
74222
74223
74224
74225
74226
Vendor
GBC (General Binding Corp.)
Health Science Associates
Internal Revenue Service
Intl. Union of Oper. Eng. AFL-CIO Local 501
lnfragard Los Angeles Members
LA CAD Corporation
Maintenance Technology Corp.
Managed Health Network
Manulkin, Glaser, & Bennett
MassMutual Michel Financial Group
Material and Contract Services
McMaster-Carr Supply Co.
Midway Mfg. & Machining Co.
Mission Uniform Service
Moreland & Associates
Court Order
National Bond & Trust
OneSource Distributors, Inc.
The Orange County Register
Orange County Sheriff
Orange County Tax Collector
Orange Fluid System Technologies, Inc.
Oxygen Service Company
OCEA
OMI Industries
P.S. Jobs
Peace Officers Council of CA
RemedyTemp, Inc.
Court Order
Snap-On Tools, Inc.
Southern California Edison
Southern Counties Lubricants
Spinitar
Stanford Center for Professional Dev.
Voided Check
SBC/MCI
The Standard Insurance Company
Thompson Industrial Supply, Inc.
Times Community News
Tony's Lock & Safe Service & Sales
Tri-State Seminar On-the-River
TEKsystems
US Filter Corporation
The Unisource Corporation
United Parcel Service
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-08-31-05
fin/210Rc
Amount
594.15
77.50
300.00
3,919.06
50.00
3,000.00
162.94
1,043.68
19.25
299.88
14,880.00
15.89
8,566.13
135.73
1,722.00
225.00
2,938.57
17.34
6,085.85
428.68
1,041.01
913.30
1,358.93
641.29
6,372.47
99.00
1,629.00
22,200.73
721.50
1,397.07
2,411.35
4,178.55
110.00
4,540.00
762.03
503.22
5,971.60
39.00
572.96
90.00
11,447.00
587.92
2,248.15
16.00
Description
Office Supplies
Training Registration
Wage Garnishment
Dues Deduction
Membership
Training Registration
Mechanical Parts & Supplies
Employee Assistance Program
Fed-Ex Shipping Charges
Executive Disability Plan Premium
Temporary Employment Services
Mechanical Parts & Supplies
Repairs & Maint. -Refurbish Belt Filter Press Drive Roller Assemblies
Uniform Rentals
Auditing Services MO 3-8-95
Wage Garnishment
U.S. Savings Bonds Payroll Deductions
Electrical Parts & Supplies
Notices & Ads
Wage Garnishment
Real Property Tax Assessment -Nautical Enterprises, Inc.
Plumbing Parts & Supplies
Specialty Gases
Dues Deduction
Instrument Parts & Supplies
Notices & Ads
Dues Deduction, Supervisors & Professionals
Temporary Employment Services
Wage Garnishment
Tools
Power
Industrial Oil
lnfocus Projector Repairs
Training Registration
Telephone Services
Executive Disability Plan Premium
Mechanical Parts & Supplies
Notices & Ads
Locks & Keys
Training Registration
Temporary Employment Services
Repairs & Maint. -DI Water System Check Valve on Holding Tank
Office Supplies
Parcel Services
Page 2of11
EXHIBITS
9/13/2005
Claims Paid From 08/16/05 to 08/31/05
Warrant No.
74227
74228
74229
74230
74231
74232
74233
74234
74235
74236
74237
74238
74239
74240
74241
74242
74243
74244
74245
74246
74247
74248
74249
74250
74251
74252
74253
74254
74255
74256
74257
74258
74259
74260
74261
74262
74263
74264
74265
74266
74267
74268
74269
74270
74271
Vendor
United Way
Univar USA
Verizon California
Voigts Manufacturing Co., Inc.
WEF
Wylie Communications
Court Order
3CMA-City-County Communications
Steve Anderson
Robert P. Ghlrelli
Ingrid G. Hellebrand
Pamela A. Koester
Adam A. Nazaroff
Charles F. Winsor
Jie K. Chang
Bruce A. Chapman
Local Agency Formation Commission
Orange County Sanitation District
South Coast Air Quality Mgmt. Dist.
State Board of Equalization
Airgas Safety, Inc.
Brithinee Electric
Consumers Pipe & Supply Co.
Mc Fadden-Dale Industrial Hardware Co.
McMaster-Carr Supply Co.
Orange Fluid System Technologies, Inc.
Shureluck Sales & Engineering
Snap-On Tools
Summit Steel
Thompson Industrial Supply, Inc.
Air Products & Chemicals, Inc.
Basic Chemical Solutions, L.L.C.
Black & Veatch Corporation
Brown & Caldwell
Camp Dresser & McKee, Inc.
Certified Truck Bodies
Delta Dental
IPMC c/o Parsons
ISEC, Inc.
Kemiron Companies, Inc.
Lee & Ro, Inc.
NRG Thermal Services, L.L.C.
Orange County Water District
Pioneer Americas, Inc.
Polydyne, Inc.
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05·06\Claims Paid Report -08-31-05
fint21onc
Amount
195.00
560.30
120.80
798.50
177.00
1,151.95
597.50
350.00
478.65
116.75
723.27
59.71
1,362.95
963.10
146.50
156.50
900.00
955.77
621.89
300.00
465.43
248.53
63.51
64.82
212.02
512.18
749.72
210.48
1,147.58
7,446.56
334,380.00
27,056.17
274,918.95
177,921.94
260,426.82
40,945.00
58,170.59
892,279.00
25, 175.00
183,801.69
85,715.01
75,214.35
6,432,035.31
304,634.30
54,032.75
Description
Employee Contributions
Chlorine
Telephone Services
Mechanical Parts & Supplies
Membership -Water Environment Federation
Training Registration
Wage Garnishment
Membership
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Annexation Fee
Petty Cash Reimb.
Employee Commute Reduction Plan Triennial Program Fee
Annexation Fee
Safety & Mechanical Supplies
Electrical Parts & Supplies
Plumbing Parts & Supplies
Tools
Mechanical Parts & Supplies
Plumbing Parts & Supplies
Mechanical Parts & Supplies
Tools
Metal
Mechanical Parts & Supplies
Professional Services SP-72
Sodium Bisulfite & Sodium Hydroxide
Engineering Services J-77 & J-102
Professional Services P2-91 & P1-37
Engineering Services J-71-8
Purchase & Installation of (1) Custom Service Truck Body
Dental Insurance Plan
Engrg. Serv. -Integrated Program/Project Mgmt., Temp. Staffing, Mat'I. & Supplies
Prof. Serv. -Remodel Lab Glassware Cleaning Area/Room 227
Ferric Chloride M.O. 9-27-95
Professional Services 5-49 & 5-50
Professional Services J-79
Joint GWRS Project J-36
Sodium Hypochlorite
Cationic Polymer MO 3-11-92
Page 3of11
EXHIBITS
9/1312005
• -. > ,.
Claims Paid From 08/16/05 to 08/31/05
Warrant No. Vendor
74272 Propipe
74273 PFE International, Inc.
74274 Tule Ranch/Magnan Farms
74275 U.S. Peroxide l.l.C.
74276 UBS Financial Services, Inc.
74277 Villa Ford
74278 Weston Solutions, Inc.
74279 ARB, Inc.
74280 DKG Construction
74281 J F Shea Construction, Inc.
74282 J R Filanc Construction
74283 Kiewit Pacific Co.
74284 Margate Construction, Inc.
74285 Morrow-Meadows Corp
74286 Southern Contracting Company
74287 Steve P Rados, Inc.
74288 Union Bank of California
74289 Wells Fargo Bank
74290 Absolute Standards, Inc.
74291 AccuStandard
74292 Advanced Business Graphics
74293 Agilent Technologies, Inc.
74294 Airco Filter Service
74295 American Airlines
74296 David Andrade
74297 Aquarium Doctor
74298 Aquatic Bioassay and Consulting Labs, Inc.
74299 Archie Ivy, Inc.
74300 AssurX, Inc.
74301 Awards & Trophies Company
74302 ABB Automation, Inc.
74303 Amtech Elevator Services
74304 ASCE Continuing Education
74305 American Telephone & Telegraph Corp.
74306 AWSI
74307 Battery Specialties
74308 Bee Man Pest Control, Inc.
74309 Ben Meadows Company, Inc.
74310 BioMerieux Vitek, Inc.
74311 BioSpherical Instruments, Inc.
74312 Brenner-Fiedler & Assoc, Inc.
74313 Brenntag Pacific, Inc.
74314 Bush & Associates, Inc.
74315 BC Wire Rope & Rigging
74316 BMC: Business Machines Consultants, Inc.
H:\depl\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-08-31-05
fin/210/lc
Amount
35,726.29
29,605.51
298,122.28
157,993.73
28,788.44
32,624.30
33,910.00
1,042,621.20
39,592.08
880,892.31
469,956.45
423,000.00
342,059.00
67,243.00
29,830.00
3.422,266.80
115,846.80
47,000.00
129.00
261.56
565.72
551.92
27.41
3,814.50
49.50
114.87
1, 130.00
4,823.00
5,279.31
183.23
393.30
1,400.00
3,226.50
25.74
150.00
716.00
450.00
52.45
559.74
747.76
1,135.10
1,077.16
7,632.00
648.63
48.27
Description
CCTV Inspection of Sewerlines for Damage, Infiltration & Illegal Connections
Postal Discount Software, License Fees & Mail Machine Replacement
Residuals Removal M.O. 3-29-95
Odor & Corrosion Control Treatment for Coll. Sys. -Hydrogen Peroxide
Remarketing Fee -Series 1993 & 1992 Advanced Refunding COP's
(1) 2005/06 Ford XL F250 Truck with Utility Bed
Sediment Toxicity Testing
Construction 7-41
Construction FE04-05
Construction J-35-1 & J-77
Construction P1-76
Construction 5-51 & 5-52
Construction P1-37
Construction FE03-24 & P2-47-3
Construction J-33-1
Construction 1-2-4
Construction 7-41, Retention
Construction 5-52, Retention
Lab Parts & Supplies
Lab Parts & Supplies
Office Supplies & Stationery
Lab Parts & Supplies
Oil Filters
Travel Services
Meeting/Training Expense Reimbursement
Human Resources Aquarium Service
Lab Services -Whole Effluent Toxicity Testing
Slurry Seal & Remarking of Pavement at Fleet Services & Lab Parking Lot
On-Site Training -CA TWEB
Awards & Trophies
Repairs & Maint. -Calibration of Magnetic Flow Meters
Elevator Maintenance
Training Registration
Telephone Services
Department of Transportation Program Management & Testing
Batteries
Pest Control
Lab Parts & Supplies
Lab Parts & Supplies
Instrument Maintenance
Compressor Parts
Janitorial Supplies
Surveying Services 7-41
Mechanical Parts & Supplies
Multifunctional Copier/Scanner Maintenance Agreement
Page 4of11
EXHIBITS
9/13/2005
Claims Paid From 08/16/05 to 08/31/05
Warrant No.
74317
74318
74319
74320
74321
74322
74323
74324
74325
74326
74327
74328
74329
74330
74331
74332
74333
74334
74335
74336
74337
74338
74339
74340
74341
74342
74343
74344
74345
74346
74347
74348
74349
74350
74351
74352
74353
74354
74355
74356
74357
74358
74359
74360
74361
Vendor
C.S. Office Interiors
California Auto Collision
California Relocation Services, Inc.
Callan Associates, Inc.
Cal Trans
Career Track Seminars MS2
Deon M. Carrico
Charles P. Crowley Co.
Coast Fire Equipment
Columbia Analytical Services, Inc.
Comm Vault Systems, Inc.
Compressor Components Of California
Consolidated Elect. Distributors, Inc.
Consumers Pipe & Supply Co.
Control Factors -Seattle, Inc.
Cooper Cameron Corporation
Cornerstone Systems, Inc.
Corporate Express
Corporate Image Maintenance, Inc.
Council on Education in Management
County Wholesale Electric Co.
Crane Veyor Corp.
Culligan of Orange County
CASA
CEM Corporation
CR&R, Inc.
David's Tree Service
Del Mar Analytical
Detection Instruments Corporation
DOB Engineering, Inc.
E. Sam Jones Distributors, Inc.
Enchanter, Inc.
Ewing Irrigation Industrial
Electrical Sales, Inc.
Electron Microscopy Sciences
FedEx Corporation
First American Real Estate Solutions
Fisher Scientific Company, L.L.C.
Flow Science, Inc.
Fluid Handling Systems
Fountain Valley Paints, Inc.
Fountain Valley Rancho Hand Wash
Franklin Covey
Frasco Profiles
Garratt-Callahan Company
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -08-31-05
fin/210/lc
Amount
106.94
1,107.52
131.25
3,650.00
15,000.00
198.00
59.50
2,066.64
594.78
870.00
12,975.03
4,740.00
4, 192.31
2,150.26
994.80
688.82
2,905.00
7,375.57
168.00
2,738.00
763.20
453.70
42.80
75.00
386.58
2,835.00
3,645.00
450.00
1,364.29
2,875.00
472.49
4,800.00
574.18
1,282.54
4,605.85
109.14
263.00
10,263.57
1,885.48
3,582.70
370.34
919.00
370.30
828.50
720.85
Description
File Cabinet Repairs
Truck Body Repairs -V-495
Office Files Moving/Relocation Services
Investment Advisor
Professional Services 5-49
Training Registration
Meeting/Training Expense Reimbursement
Mechanical Parts & Supplies
Fire Extinguishers
Analysis of Biosolids and Wastewater
Software Support -Galaxy
Repair & Maintenance Service. -Igniter LSVB Engine
Electrical Parts & Supplies
Plumbing Parts & Supplies
Filters
Engine Supplies
Software Maintenance -Trend Micro
Office Supplies
Custodial Services Spec. No. 9899-09
Training Registration
Electrical Parts & Supplies
Overhead Crane Repairs & Maintenance Services
Maint. Agreement -Cen Gen Water Softener System
Environmental Assessment Division Meeting Registration
Lab Parts & Supplies
Container Rentals
Tree Maint. Service
Lab Analysis of Biosolids
Instrument Parts & Supplies
Grant & Management Consulting Services
Electrical Parts & Supplies
Ocean Monitoring & Outfall Inspection & Maintenance
Landscape Irrigation Supplies
Electrical Parts & Supplies
Lab Parts & Supplies
Freight Services
On-Line Orange County Property Information
Lab Parts & Supplies
Prof. Serv. -Dry/Wet Weather Flow Modeling. Pumping & lnterplant Line Usage
Pump
Paint Supplies
Vehicle Washing & Waxing Services
Office Supplies
Human Resources Background Checks
Chemicals
Page 5of11 EXHIBIT B
9/1312005
...
Claims Paid From 08/16/05 to 08/31/05
Warrant No.
74362
74363
74364
74365
74366
74367
74368
74369
74370
74371
74372
74373
74374
74375
74376
74377
74378
74379
74380
74381
74382
74383
74384
74385
74386
74387
74388
74389
74390
74391
74392
74393
74394
74395
74396
74397
74398
74399
74400
74401
74402
74403
74404
74405
74406
Vendor
GeomAtrix Consultants, Inc.
George T. Hall
Goodway Technologies Corp.
Grainger, Inc.
Great Western Sanitary Supplies
Guarantee Records Management
Grant & Colleen Anderson
GTSI Corporation
Harold Primrose Ice
Harrington Industrial Plastics, Inc.
High Impact Priority Training
Home Depot Credit Services
ldexx
Impulse
Industrial Distribution Group
Industrial Threaded Products, Inc.
Information Handling Services
Iron Mountain
Irvine Ranch Water District
ISi, Inc.
J.G. Tucker and Son, Inc.
Johnstone Supply
J2 Printing Services
Kelly Paper
Kienow Associates, Inc.
Kerr Engineering & Sales, Inc.
l&N Image Apparel
Labeltronix
Langevin learning Services, Inc.
Lucci's Gourmet Foods, Inc.
Larry Lentz
LECO Corporation
LINJER
M. J. Schiff & Associates, Inc.
Mandie Motors
Mantek
Matheson Tri Gas, Inc.
McJunkin Corporation
McMaster-Carr Supply Co.
Medlin Controls Co.
Mid-West Associates
Mission Uniform Service
Morton Salt
Motion Industries, Inc. CA 55
Neal Supply Co.
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report-08-31-05
fin/210nc
Amount
8,559.98
172.40
723.00
2,249.35
258.35
372.87
1,017.81
4,632.18
140.00
2,288.54
1,520.00
990.92
2,693.75
119.81
4,090.33
530.26
2,495.00
91.13
49.32
1,663.80
414.84
196.84
280.15
27.97
9,960.00
2,865.82
774.89
4,125.00
999.00
37.50
3,945.54
434.19
10,023.23
19,843.41
258.00
363.61
1,837.22
238.24
1,004.80
722.50
2,630.41
342.58
1,486.79
511.84
1,340.77
Description
Soils, Concrete & Other Material Testing
Electrical Parts & Supplies
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Janitorial Supplies
Off-Site Records Storage
User Fee Refund Re Septic Tanks
(1) laptop Computer
Ice For Samples
Plumbing Supplies
On-Site Safety Training -Boom & Scissor lift
Misc. Repair & Maintenance Material
lab Parts & Supplies
Instrument Parts & Supplies
Tools, Paint & Misc. Maintenance Supplies
Mechanical Parts & Supplies
Annual Software Upgrade & Support -NFPA Data Pages
Bid Document Storage Fees P1-37
Water Use
Software Maintenance Agreement -lnformtel
Filters
Electrical & Mechanical Parts & Supplies
Printing Services -Vehicle Equipment Chargeouts Forms
Paper
legal Services 1-2-4
Mechanical Parts & Supplies
OCSD Polo Shirts -Employee Activity Comm.
label Printer Maintenance
Training Registration
Meeting Expense
User Fee Refund Re Septic Tanks
lab Parts & Supplies
Professional Services -DART MO 9-22-99
Professional Services J-106
Towing Services
Pest Control Supplies
Specialty Gases
Plumbing Supplies
Safety Signs, Electrical & Mechanical Supplies, and Tools
Instrument Supplies
Pump Supplies
Uniform Rentals
Salt
Mechanical Parts & Supplies
Plumbing Supplies
Page 6of11
EXHIBITS
9/1312005
Claims Paid From 08/16/05 to 08/31/05
Warrant No.
74407
74408
74409
74410
74411
74412
74413
74414
74415
74416
74417
74418
74419
74420
74421
74422
74423
74424
74425
74426
74427
74428
74429
74430
74431
74432
74433
74434
74435
74436
74437
74438
74439
74440
74441
74442
74443
74444
74445
74446
74447
74448
74449
74450
74451
Vendor
The Norco Companies
Norms Refrigeration
NALCO Company
Neutron Products, Inc.
O C Tanner Recognition Company
Office Depot Business Services Div.
Omega Industrial Supply, Inc.
Omni Western Incorporated
OneSource Distributors, Inc.
Orange County Industrial Plastics
Orange Fluid System Technologies, Inc.
Oxygen Service Company
OCB Reprographics
Pacific Mechanical Supply
Partners Consulting Services
Pen Valve
PerkinElmer LAS
Permaseal
Pixelpushers, Inc.
Port Supply
Power Measurement USA, Inc.
Primary Source Office Furnishings, Inc.
Prod a ta
Profit Techniques, Inc.
Prudential Overall Supply
Pacific Supply
Partsmaster
PBM IT Solutions
PCG Industries
Q Air -Calif. Div. Pump Engineering
R. L. Abbott & Associates
Rees Scientific
Roto Rooter -N.O.C.#11
Royale Cleaners
Schwing America, Inc.
Scott Specialty Gases, Inc.
Sewer Equipment Company of America
Shamrock Supply Co., Inc.
Shureluck Sales & Engineering
Siemens
Skalar, Inc.
Snap-On Tools, Inc.
South Coast Air Quality Management Dist.
Southern California Edison
Southern California Edison
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -08·31-05
fin/210nc
Amount
198.59
45.11
8,011.10
21,451.63
1,504.63
2, 104.68
1,132.28
2,796.11
1,005.45
840.45
688.09
2,385.08
555.21
326.47
4,800.00
347.92
240.58
449.96
7,980.00
43.26
7,003.75
1,946.83
315.00
5,625.00
3, 137.76
152.83
218.81
1,483.72
6,625.00
649.62
3,000.00
1,526.13
383.68
22.00
157.66
844.13
178.21
2,087.12
88.25
12,766.31
25.17
5,220.45
3,174.31
6,754.21
33.96
Description
Mail Delivery Service
Electrical Repairs & Maintenance Services
Anionic Polymer Tote
Anionic Polymer
Employee Service Awards Program
Office Supplies
Janitorial Supplies
Tools
Electrical Parts & Supplies
Clear Polycarbonate Sheets
Plumbing Parts & Supplies
Specialty Gases
Printing Service -MO 1 /26/00
Plumbing Supplies
FIS On-Site Support -Help Desk
Plumbing Parts & Supplies
Lab Parts & Supplies
Lube Oil
Prof. Serv. -Design/Build/Implement Web-Based On-Line Job App. & Tracking Sys.
Boat Supplies
Software Maintenance Agreement -ION Enterprise/Pegasys
Office Furniture
Software Maint.
Professional Services -0 & M Manager Coaching
Uniforms & Related Articles
Brake Fluid
Mechanical Parts & Supplies
Computer Hardware/Software -CISCO
Repairs & Maintenance Services -Drive Shafts
Filters
Kem County Biosolids Consulting Services
Lab Instrument Services -Additional Data Inputs
Maintenance Services -Floor Drains in Fleet Services
Dry Cleaning Services
Pump Parts & Supplies
Specialty Gases
Hose Supplies
Concrete & Oil Absorbent
Mechanical Parts & Supplies
Electrical Parts & Supplies
Lab Parts & Supplies
Tools
Permit Fee J-71-8
Power
Power
Page 7of11 EXHIBIT B
9/13/2005
. "
Claims Paid From 08/16/05 to 08/31/05
Warrant No.
74452
74453
74454
74455
74456
74457
74458
74459
74460
74461
74462
74463
74464
74465
74466
74467
74468
74469
74470
74471
74472
74473
74474
74475
74476
74477
74478
74479
74480
74481
74482
74483
74484
74485
74486
74487
74488
74489
74490
74491
74492
74493
74494
74495
74496
Vendor
Sparkletts
St Croix Sensory, Inc.
Stanley Steamer International, Inc.
Stockstill Communications
Sunset Industrial Parts
SBC
SBC Long Distance
SBC/MCI
SCAP
SETAC
SKC-West, Inc.
SPEC Services, Inc.
T&T Valve and Instrument
Terminix International
The Standard Insurance Company
Thomas V. Garlinger
Thompson Industrial Supply, Inc.
Times Community News
Tony's lock & Safe Service & Sales
Townsend Public Affairs
Tri-State Seminar On-the-River
Truck & Auto Supply, Inc.
Turblex, Inc.
TMobile
US Filter Corp.
Ultra Scientific
Underground Service Alert of So. Calif.
The Unisource Corporation
United Pacific Services, Inc.
United Parcel Service
David A. Usher
Vapex, Inc.
Varian, Inc.
Verizon California
Verne's Plumbing
Village Nurseries
Vision Service Plan-(CA)
Vortex Corp.
VWR Scientific Products
The Wackenhut Corporation
Waco Filters
Water 3 Engineering, Inc.
Waters Corporation
Waxie Sanitary Supply
West Coast Safety Supply Co.
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -08-31-05
fin/210/lc
Amount
1,874.22
745.00
2,489.17
5,000.00
3,687.08
2,063.56
1,543.95
2,783.35
5,000.00
465.00
1,817.18
18,669.59
3,156.68
930.00
4,835.66
1,995.00
896.77
39.00
51.18
5,000.00
45.00
260.22
10,013.44
88.72
817.08
322.24
1,692.60
614.83
1,785.00
1,530.64
49.50
1,287.00
364.68
81.33
4,862.20
151.71
9,857.88
1,647.93
8,605.23
4,159.87
782.93
5, 107.46
1,403.07
37.39
160.54
Description
Drinking Water/Cooler Rentals
Outside lab Services -Olfactometry Testing
Carpet Cleaning Services
Professional Services SP-105
Mechanical Parts & Supplies
Telephone Services
Telephone Services
Telephone Services
Kem County litigation Fund (So. Calif. Alliance of Publicly Owned Treatment Works)
Training Registration (Society of Environmental Toxicology & Chemistry)
Tedlar Bag
Engineering Services J-33-1
Valves
Pest Control
Executive Disability Plan Premium
lab Analyses of Biosolids
Mechanical Parts & Supplies
Notices & Ads
locks & Keys
legislative & Executive Advocate for Grant Funding
Training Registration
Automotive Supplies
Repairs & Maintenance Services -No. 2 Blower
Wireless Services
Service Agreement -DI Water System at Plants 1 & 2
Lab Parts & Supplies
Membership -Underground Utility Identification/Notification Service
Office Supplies
Landscape Maintenance Service
Parcel Services
Meeting/Training Expense Reimbursement
Instrument Parts & Supplies
Lab Parts & Supplies
Telephone Services
Service Contract-Testing & Cert. Backflow Devices at Pits. 1 & 2 and Pump Sta.
landscaping Supplies
Vision Service Premium
Repairs & Maintenance Services -Barrier Arm Gate
Lab Parts & Supplies
Security Guards
Filter Elements
Engineering Services J-67
Lab Parts & Supplies
Janitorial Supplies
Safety Supplies
Page 8of11
EXHIBIT B
9/13/2005
.. •• '1r)
Claims Paid From 08/16/05 to 08/31/05
Warrant No.
74497
74498
74499
74500
74501
74502
74503
74504
74505
74506
74507
74508
74509
74510
74511
74512
74513
74514
74515
74516
74517
74518
74519
74520
74521
74522
74523
74524
74525
74526
74527
74528
74529
74530
74531
74532
74533
74534
74535
74536
74537
74538
74539
74540
74541
Vendor
WEFTEC
WQI
Xerox Corporation
Yale/Chase Materials Handling, Inc.
YCA
1-800-Conference(R)
California Bank & Trust
Shasta Electric, LP.
Torrey Pines Bank
Layne T. Baroldi
Robert M. Bell
Thomas M. Blanda
Martin A. Dix
Richard Gallegos
David A. Ludwin
Robert D. Michaels
Anissa C. Morgenstern
Quynh D. Nguyen
Doug Rulison
Richard E. Schlegel, Jr.
Jonathan K. Thomsic
Michael I. Zedek
The B.N. & S.F. RY. Co.
Local Agency Formation Commission
Local Agency Formation Commission
Local Agency Formation Commission
Rodriguez, David & Gateway
Partners Consulting Services
Southern California Edison
Woodruff, Spradlin & Smart
Morrow-Meadows Corp.
Airgas Safety, Inc.
Alta-Robbins, Inc.
Basic Chemical Solutions, L.L.C.
California Auto Collision
Cingular Wireless Airtime
City of Tustin
Conrad & Associates, L.L.P.
Consumers Pipe & Supply Co.
Court Trustee
California Special Districts Association
Edwin M. Perkins
Employee Benefits Specialists, Inc.
Fisher Scientific
Fitch, Inc.
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -08-31-05
fin/210/lc
Amount
2,075.00
500.00
825.00
102.49
5,100.00
395.35
1,570.00
22,882.00
24,734.55
283.15
821.00
431.89
578.49
678.14
709.00
919.00
315.00
756.52
321.54
1,017.93
255.12
242.10
250.00
6,750.00
6,750.00
1,600.00
3,000.00
40,260.00
75,601.26
80,091.31
27,187.00
2,934.38
60.92
20,645.73
1,245.68
6,145.31
518.08
15,566.00
1,370.13
454.49
185.00
23,057.42
9,589.28
2,973.71
3,000.00
Description
Training Registration
Training Registration
Maintenance Agreement -Xerox Synergix Copier
Mechanical Parts & Supplies
Training Registration
Conference Telephone Calls
Construction J-33-1 A, Retention
Construction SP-94
Construction P1-76, Retention
Meetingrrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Meetingfrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Meetingfrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Meetingfrraining Expense Reimbursement
Meetingrrraining Expense Reimbursement
Encroachment Permit
Annexation Fees
Annexation Fees
Annexation Fees
Employee Computer Loan Program
FIS On-Site Support -HR & Payroll Development
Power
Legal Services MO 7-26-95
Construction P2-4 7-3
Safety Supplies
Instrument Supplies
Sodium Bisulfite & Sodium Hydroxide
Truck Body Repairs -V-471 & V-474
Wireless Services
Water Use
Financial Auditing Services
Plumbing Parts & Supplies
Wage Garnishment
Training Registration
Professional Services -Water Quality Compliance
Reimbursed Prepaid Employee Medical & Dependent Care
Lab Parts & Supplies
Annual Surveillance Fee for Series 2000 A & B Certificates of Participation
Page 9of11 EXHIBIT B
9/13/2005
.. ,
Claims Paid From 08/16/05 to 08/31/05
Warrant No.
74542
74543
74544
74545
74546
74547
74548
74549
74550
74551
74552
74553
74554
74555
74556
74557
74558
74559
74560
74561
74562
74563
74564
74565
74566
74567
74568
74569
74570
74571
74572
74573
74574
74575
74576
74577
74578
74579
74580
74581
74582
74583
74584
74585
74586
Vendor
Franchise Tax Board
Victoria L. Francis
Grainger, Inc.
GM Roofing
Horizon Technology
City of Huntington Beach
Industrial Distribution Group
Internal Revenue Service
J R Filanc Construction
Maintenance Technology Corp.
McMaster-Carr Supply Co.
Motion Industries, Inc. CA 55
Marie L. Moran
Maureen Kane & Associates
National Bond & Trust
City of Newport Beach
Orange County Pest Control, Inc.
Orange County Sheriff
Orange Fluid System Technologies, Inc.
Oxygen Service Company
OCEA
Polydyne, Inc.
Praxair Distribution, Inc.
Praxair, Inc.
Public Resources Advisory Group
Restek Corporation
Roof Removal, Inc.
Ryan Herco Products Corp.
Scott Specialty Gases, Inc.
Shureluck Sales & Engineering
Snap-On Tools, Inc.
Southland Envelope Company, Inc.
State Board of Equalization
Summit Steel
SHRM
Thompson Industrial Supply, Inc.
Thompson Publishing Group
United Way
Vertex, Inc.
VWR Scientific Products
WEF
Xerox Corporation
Yale/Chase Materials Handling, Inc.
Roy J. Reynolds
Bell, Robert
H:\dept\fin\EXCEL.dla\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -08-31·05
fin/210nc
Amount
50.00
54.50
832.42
10,650.00
43.96
108.29
423.12
300.00
8,432.57
1,762.71
353.16
826.25
1,000.00
880.00
2,938.57
55.35
139.00
428.67
276.33
113.62
641.29
19,699.21
81.03
334.57
6,000.00
1,995.42
3,000.00
27.74
23.60
28.69
83.19
684.66
350.00
8,567.68
160.00
3,941.46
403.50
195.00
3,938.00
146.61
139.00
14,323.21
612.62
259.36
2,080.77
Description
Wage Garnishment
Meeting/Training Expense Reimbursement
Electrical Parts & Supplies
Roof Maintenance -Power Bldg. at Pit. 1
Lab Parts & Supplies
Water Use
Mechanical & Paint Supplies
Wage Garnishment
Drain Repairs to Scrubbers 5 -8
Mechanical Parts & Supplies
Electrical, Mechanical & Maintenance Material & Supplies
Mechanical Parts & Supplies
On-Site Training -Professionalism & Business Protocol
Training Registration
U.S. Savings Bonds Payroll Deductions
Water Use
Pest Control Services
Wage Garnishment
Plumbing Parts & Supplies
Special Gases
Dues Deduction
Cationic Polymer MO 3-11-92
Demurrage
Lab Parts & Supplies
Financial Advisory Services
Lab Parts & Supplies
Roofing Material Removal & Disposal -Pit. 1 Power Building
Tube Rack
Cylinder Rental & Demurrage Fees
Pump Parts & Supplies
Tools
Printing Services -Payroll Envelopes
Annexation Fee
Metal
Membership (Society for Human Resources Management)
Mechanical Parts & Supplies
Publication
Employee Contributions
Software Maintenance
Lab Parts & Supplies
Membership -Water Environment Federation
Copier Lease, Maint., Supplies, Mail Processing & Meeting Room Set-up Services
Electric Cart Parts
Meeting/Training Expense Reimbursement
Employee Computer Loan Program
Page 10of11 EXHIBIT B
9/13/2005
Warrant No.
74587
74588
74589
74590
74591
74592
74593
Vendor
Government Finance Officers Association
George Nashed & Mary Nashed
Dean R. Karels
Larry E. Lazorek
Y.J. Shao
Duane T. Smith
Ken H. Wong
Total Accounts Payable· Warrants
Payroll Disbursements
38561 -38645 Employee Paychecks
38646 -38652 Employee Paychecks
38653 -38742 Employee Paychecks
387 43 -387 46 Employee Paychecks
115061 -115612 Direct Deposit Statements
115613 -116165 Direct Deposit Statements
Total Payroll Disbursements
Wire Transfer Payments
OCSD Payroll Taxes & Contributions
OCSD Payroll Taxes & Contributions
US Bank
Total Wire Transfer Payments
Total Claims Paid 08/16/05 • 08/31/05
Claims Paid From 08/16/05 to 08/31/05
Amount
575.00
3,834.26
39.50
54.50
139.00
49.50
49.50
$ 18, 785,802.85
$ 146,553.84
2,638.74
153,180.47
2,586.52
1,106,980.62
1, 120,323.18
$ 2,532,263.37
$ 646,255.33
645,142.58
171,001.51
$ 1,462,399.42
$ 22,780,465.64
Description
Review Fee -Distinguished Budget Presentation Award for FY Ending 6/30/05
Claim Settlement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Biweekly Payroll 08/17 /05
Retros, Termination, Void/Reissue & Adjustment Paychecks 8/16/05 to 8/18/05
Biweekly Payroll 08/31/05
Void/Reissue & Retro Paychecks 8/31 /05
Biweekly Payroll 8/17 /05
Biweekly Payroll 08/31/05
Biweekly Payroll 8/17/05
Biweekly Payroll 8/31 /05
Series 2000 A & B Refunding COP's August Interest Payment
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\05-06\Claims Paid Report -08-31-05
fin121onc Page 11 of 11 EXHIBITS
9/13/2005
'"
DRAFT
MINUTES OF STEERING COMMITTEE MEETING
VVednesday,August24,2005
A meeting of the Steering Committee of the Orange County Sanitation District was
held on Wednesday, August 24, 2005 at 5 p.m., in the District's Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMIITEE MEMBERS:
Directors Present:
Steve Anderson, Chair
Jim Ferryman, Vice Chair
Carolyn Cavecche, Chair, OMTS Committee
Roy Moore, Chairman, FAHR Committee
Jim Silva, County Supervisor
Directors Absent:
Tod Ridgeway, Chairman, PDC Committee
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
OTHERS PRESENT:
Bradley R. Hagin, General Counsel
Director Doug Davert
Don Hughes
Layne Baroldi
Jennifer Cabral
Jim Colston
Mike Moore
Ryal Wheeler
STAFF PRESENT:
Blake Anderson, General Manager
Nick Arhontes, Director of Regional Services and
Assets
Bob Ghirelli, Director of Technical Services
David Ludwin, Director of Engineering
Patrick Miles, Director of Information Technology
Jim Herberg, Director of Operations and
Maintenance
Gail Garrett, Committee Secretary
There were no comments by any member of the public.
(4) RECEIVE. FILE AND APPROVE MINUTES OF PREVIOUS MEETING
The minutes of the July 20, 2005 Steering Committee meeting were approved as drafted.
(5) REPORT OF THE COMMITTEE CHAIR
Committee Chair Steve Anderson announced the passing today of Director Harry Dotson,
whose family has requested donations to the Boys and Girls Club of Stanton for the "Teen
Center" expansion. There were no details regarding funeral arrangements.
Minutes of the Steering Committee
Page2
August24,2005
Chair Anderson also noted with sadness that Dr. Ron Linsky, Executive Director at NWRI,
passed away from complications related to an acute form of leukemia. There will be a
"Celebration of Life" in mid-October arranged by his family.
Several Directors and District staff attended the CASA annual conference in San Diego last
week. Director Carolyn Cavecche gave an update on the conference and commended
Layne Baroldi for a job well done on the panel. She noted that topics discussed included
work by the State Water Resources Control Board (SWRCB) to develop state-wide waste
discharge requirements for local sewers and privately owned sewer laterals. Staff noted that
our Regional Water Quality Control Board (RWQCB), with our assistance, developed local
agency sewer maintenance requirements for our region in 2002 and they seem to be effective
and appropriate. Some local agencies in the San Francisco Bay Area region have programs
for the repair of laterals at the time of the property sale.
Director Carolyn Cavecche announced the Asset Management report the Board requested
last month will be presented at all three committees in September.
Dr. Bob Ghirelli, Director of Technical Services, presented an update on the ongoing
discussions with SAWPA on the SARI line improvements and the future use of the SARI line
for brine discharges and other wastewater discharges.
Dr. Ghirelli provided an update on the Urban Runoff Ad Hoc Committee which met on August
3rd. Committee Chair Don Bankhead will present for board approval tonight Resolution No.
OCSD05-22 supporting the county's urban runoff management program. The resolution also
authorizes the chair of the board to designate a board representative to the county's urban
runoff management committee for the north county area.
Committee Chair Doug Davert provided an update on meetings held by the Ad Hoc
Committee for the General Manager's Evaluation.
a. The committee recommended that Creative Management Solutions be issued a
contract at a proposed cost of $18,750 to conduct a management audit of the
District.
It was moved, seconded and duly carried to approve the recommended action
specified in Item 5(a) above. There were no abstentions.
b. The committee requested and received direction from the Steering Committee to
retain Moreland & Associates to conduct a compliance audit of the Dharma
contract to ensure proper procurement practices were followed.
It was moved, seconded and duly carried to approve the recommended action
specified in Item 5(b) above. There were no abstentions.
The above recommendations will be presented to the Board tonight for ratification. General
Counsel was directed to retain both consultants.
-'-
. • Minutes of the Steering Committee
Page 3
August24,2005
(6) REPORT OF THE GENERAL MANAGER
Dr. Ghirelli reported that SAWPA will work with District staff to explore ways to
economically transport brines through the existing SARI line. General Manager
Anderson and staff will meet with SAWPA staff to discuss the future of the SARI line.
Dr. Ghirelli will meet with the SAWPA board members in the next 30-60 days.
Dr. Ghirelli also reported on the Disinfection program and future options. The Operations
and Maintenance department is exploring changes in the District's disinfection program
that may save the district up to $1 million a year in chemical costs while maintaining
compliance with the bacteria and chlorine limits in our ocean discharge permit. This
year's annual disinfection budget is over $7 million and the price bleach has risen by
more than 30%. Staff will meet with the Regional Water Quality Control Board and with
key people in the community to keep them informed.
Layne Baroldi updated the committee on the status of the two bills that Senator Dean
Florez introduced and the status of the initiative process that the Senator and others are
attempting to achieve in Kern County for June 2006. General Manager Anderson and
Mr. Baroldi met with City of LA staff and the City's Board ·of Public Works President
Commissioner Ruiz, at the City's invitation, to discuss a strategy to address the Kern
County ballot initiative that seeks to ban all biosolids land application in the
unincorporated County areas. The ballot initiative petition is being circulated in Kern
County and 15,000 valid signatures are needed to place the initiative on the June 2006
ballot. The proponents plan to collect 30,000 signatures by December 2005.
The Executive Management Team held a Retreat on August 8, 2005. General Manager
Anderson reported that they are drafting a report on strategic initiates that will be
provided to the Steering Committee in September.
General Manager Anderson reviewed a 12-Month Summary of the District's legal fees for
the period ending June 30.
AB 1234 (Salinas) re compensation and ethics training which affects cities, counties and
special districts will likely be approved by the legislature and signed by the governor.
Ethics training will be required for all elected local officials to be conducted every two
years. There are additional procedural, sunshine and reporting provisions in the bill that
the Sanitation District already performs.
General Manager Anderson reported that he has been elected to the CASA Board of
Directors as a member at large. He noted this is a distinct advantage to the District and
will add to the leadership we already exert on air quality, biosolids and public information
issues.
(7) REPORT OF GENERAL COUNSEL
General Counsel Brad Hogin reported on the following:
a. The Bushard settlement is final, pursuant to the Board's approval.
Minutes of the Steering Committee
Page4
August24,2005
b. General Counsel provided an update on the Pall litigation, informing that counsel will
be moving forward with a motion for summary adjudication of issues. The GWR
Steering Committee will meet with General Counsel on September 12, prior to the
Mandatory Settlement Conference on September 16. General Counsel noted that the
Pall settlement demand has dropped from $3 million to $580,000.
c. Kimberly-Clarke has agreed to third-party oversight to review fees. General Counsel
and staff are continuing negotiations with Kimberly Clarke.
(8) DISCUSSION ITEMS (Items A-B)
A. The Agenda Items scheduled to be reviewed by the Board's working committees in
September were reviewed.
Jim Herberg, Director of Operations and Maintenance, clarified that OMTS Item 6, Asset
Management Improvement is an information only item. Nick Arhontes, Director of
Regional Assets and Services, pulled OMTS Item 4, Fleet Management Software
system; it will be presented to the December OMTS.
General Manager Anderson announced that he will be on vacation from September 1
through September 19, 2005. Dr. Ghirelli will be the Acting General Manager during
that period.
B. The agenda items scheduled to be presented to the Board at tonight's meeting
were reviewed.
(9) OTHER BUSINESS. COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS. IF ANY
There was no other business discussed.
(10) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(11) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND/OR STAFF REPORT
There were none.
(12) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday, September 28, 2005 at 5 p.m.
Minutes of the Steering Committee
Pages
August24,2005
The next Board Meeting is scheduled for Wednesday, September 28, 2005 at 7 p.m.
(13) CLOSED SESSION
The Committee convened at 6:20 p.m. in Closed Session, pursuant to Section 54956.9 and
54956.8 to discuss two items. Minutes of the Closed Session are on file with the Board
Secretary. Confidential Minutes of the Closed Session held by the Steering Committee have
been prepared in accordance with Government Code Section 54957.2, and are maintained by
the Board Secretary in the Official Book of Confidential Minutes of Board and Committee Closed
Meetings. A report of the recommended actions will be publicly reported at the time the
approved actions become final.
At 6:50 p.m., the Committee reconvened in regular session.
(14) ADJOURNMENT
The Chair declared the meeting adjourned at 6:50 p.m.
Submitted by:
Gail Garrett
Steering Committee Secretary
H:ldept\agenda\Steering Committee\2005\08\082405 DRAFT SC Minutes.5.doc
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
Orange County Sanitation District
Wednesday, September 7, 2005-5:00 P.M.
A meeting of the Operations, Maintenance and Technical Services Committee of the Orange
County Sanitation District was held on September 7, 2005, at 5:00 p.m. in the Sanitation
District's Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
OMTS Directors Present:
Carolyn Cavecche, Chair
Doug Davert, Vice Chair
Don Bankhead
Sukhee Kang
Ken Parker
David Shawver
Steve Anderson, Board Chair
OMTS Directors Absent:
James M. Ferryman, Board Vice Chair
Staff Present:
Nick Arhontes, Director of Regional Assets &
Services
Bob Ghirelli, Director of Technical Services
Jim Herberg, Director of Operations & Maintenance
Patrick Miles, Director of Information Technology
Mike White, Acting Director of Finance
Lilia Kovac, Committee Secretary
Others:
Norbert Gaia
Jeff Reed
Juanita Skillman
Doug Stewart
John Swindler
Tom Thompson
Simon Watson
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Committee Chair Cavecche informed the committee that she would not be able to attend the
November OMTS meeting due to a conflict in her calendar, and asked the rest of the members
to advise if unable to attend to ensure a quorum. Chair Cavecche also reminded the committee
that OMTS is dark in October due to the League of Cities' Conference, but will reconvene in
November.
Minutes of the Operations, Maintenance
and Technical Services Committee
September 7, 2005
Page2
Alternate Director David Shawver of Stanton was welcome to the meeting, who attended due to
the unfortunate loss of Director Dotson.
(5) REPORT OF THE GENERAL MANAGER
Blake Anderson, General Manager, was reported to be on vacation, and Bob Ghirelli, Director of
Technical Services reported on his behalf. Mr. Ghirelli informed the Committee members that
KCET and KOCE would be airing a segment on Biosolids.
Red Cross has requested general assistance to help victims of the Hurricane Katrina and Bob
Ghirelli reported that Chair Anderson gave authorization to provide qualified personnel to assist
in the disaster response in the Gulf. A Sanitation District's First Aid/Medical Emergency Team
will be deployed as working schedule allows, and will be assigned on two-week intervals.
Salaries and medical insurance will be covered by the Sanitation District; air, food and lodging
expenses will be covered by the Red Cross. Sewer cleaning crews and equipment are being
offered when the rebuilding of the damaged area begins.
(6) CONSENT CALENDAR ITEMS
a. The minutes of the July 6, 2005 Operations, Maintenance and Technical Services
Committee meeting were approved and ordered filed.
b. OMTS05-39 Receive and file Technical Services Monthly Report, which focuses on
regulatory, biosolids and performance measures for the Technical
Services Department.
c. OMTS05-40 Receive and file Operations & Maintenance Monthly Report, which
focuses on compliance, financial data and performance measures for
Operations and Maintenance Department.
d. OMTS05-41 Receive and file Regional Assets and Services Monthly Report, which
focuses on current business information, performance trends and
financial information of the business units.
e. OMTS05-42 Recommend to the Board of Directors to authorize the General Manager
to approve Amendment No. 2 to the Power Purchase Agreement (QF
1098) with Southern California Edison Company, changing the type of the
Plant 2 power generating facility from small power producer to co-
generator facility.
Jim Herberg, Director of Operations and Maintenance, proposed
changing the facility's operating type in order to meet the new air quality
standards by reducing the emissions. These regulations would be able to
be met by reducing the plant's generating capacity to 80% and
purchasing 20% operating power from SCE. The co-generator facility
category provides more flexibility for the Sanitation District to operate
Minutes of the Operations, Maintenance
" and Technical Services Committee
September 7, 2005
Page3
Motion:
financially-efficient and meeting air emission standards. A full report will
be presented in November to the Committee.
Moved, seconded and duly carried to approve the recommended actions
for items specified as 6(a) through (e) under Consent Calendar.
(7) ACTION ITEMS
a. OMTS05-43 Recommend to the Board of Directors to receive and file Biannual
Motion:
Consent Decree Report.
Jim Colston, Environmental Compliance Services, briefly reviewed the
current status of the Sanitation District's compliance to the requirements
of the consent decree for secondary treatment standards. The Report
included the effluent limitation and actual values, as well as construction
milestones and achievements.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
b. OMTS05-44 Recommend to the Board of Directors to: (1) Establish an initial budget
Motion:
not to exceed $260,000 annually for the Fats, Oil and Grease (FOG)
screening inspection program of which the District's proportionate share
is estimated at a maximum of $12,000 per year;
(2) Authorize the General Manager to enter into an agreement with the
County of Orange for the provision of the FOG inspection program by the
Orange County Health Care Agency for three years, in a form approved
by General Counsel; and,
(3) Authorize the General Manager to enter into agreements with each
participating Wastewater Discharge Requirement (WDR) Co-Permittee for
inspections in their service areas for three years.
Mark Kawamoto presented the proposed FOG inspection program led by
the Sanitation District and the benefits to each participating city. Those
cities choosing not to participate in this inspection program, would be
subject to closer scrutiny by the Regional Board.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
c. OMTS05-45 Recommend to the Board of Directors to ratify Change Order No. 1 to
Purchase Order 101494 OA, issued to Partners Consulting for JD
Edwards Help Desk Support, Specification No. S-2002-11 OBD,
authorizing an addition of $26,504, increasing the total contract amount to
Minutes of the Operations, Maintenance
and Technical Services Committee
September 7, 2005
Page4
Motion:
$206,504, for additional expenses incurred during the contract period of
April 1, 2004 to March 31, 2005.
Patrick Miles, Director of Information Technology, presented the
ratification request for the additional expenses incurred for consulting
services provided to the Sanitation District's for effective interface with the
Financial Information System (FIS). He also reported to the Committee
members the results of an audit conducted to justify these expenses to be
valid and necessary.
Committee members indicated concern over the failures in the processes,
and Patrick Miles assured that these would not be reoccurring due to new
preventative measures that had been established as a result of this
situation.
It was moved, seconded and duly carried to move the matter to the Board
without a recommendation.
d. OMTS05-46 Recommend to the Board of Directors to Approve Amendment No. 2 to
Motion:
the Consultant Services Agreement with Linjer Inc., providing for
continuing consulting services to manage the completion of the Collection
Facilities O&M Division's Reinvention Project, for an amount not to
exceed $112,000 effective September 27, 2005 through June 30, 2006.
A report was presented by Nick Arhontes, Director of Regional Assets
and Services, requesting support for the continuation of consulting
services from Linjer, Inc. through the end of FY 05/06.
The agenda and agenda report received by the OMTS Committee
members identified the Amendment as No. 1 , however, it should have
been identified as Amendment No. 2.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
(8) INFORMATIONAL ITEMS
a. OMTS05-47 Asset Management Program, Job No. SP-68-2.
Jim Herberg, Director of Operations and Maintenance, was available to
answer questions on a comprehensive Asset Management project report.
Doug Stewart, Asset Management Coordinator, advised that the option of
completing the program solely with staff will increase the costs and length
of time to complete the process. The program being led by professional
consultants would lead to a more educated process and more cost
efficient. Presentation slides were forwarded to each committee member
by e-mail for their review. The Board of Directors will be presented at the
Minutes of the Operations, Maintenance
and Technical Services Committee
September 7, 2005
Pages
next Board meeting with the approval request for continuation of the
program.
(9) REPORT OF DIRECTOR OF INFORMATION TECHNOLOGY
Director of Information Technology, Patrick Miles, had no report.
(10) REPORT OF DIRECTOR OF OPERATIONS AND MAINTENANCE
Director of Operations and Maintenance, Jim Herberg, reported that staff will be discussing with
the Regional Water Quality Board the possibility of reducing the amount of bleach and sodium
bi-sulfate used as disinfection chemicals. Although occasional variances in bacterial
concentration may be experienced, the Sanitation District would continue to meet the permit
requirements. The reduction of chemicals offers a projected savings of $1 M; and a reduced
amount of chemicals discharged out to the ocean. An update of these discussions will be
presented in November.
(11) REPORT OF DIRECTOR OF TECHNICAL SERVICES
Bob Ghirelli, Director of Technical Services, reported that an error had been made in the dollar
amount of the contract in the agenda report for the Environmental Compliance Assessment
Program (ECAP). The amount of the approved contract was incorrectly proposed for approval
at $149,000, however, the correct amount should have been $149,515. He informed the
committee of the change and requested that it be noted for the record in the minutes of the
meeting.
(12) REPORT OF DIRECTOR OF REGIONAL ASSETS AND SERVICES
Nick Arhontes, Director of Regional Assets and Services, requested input on the newly
developed monthly report which includes all department activities. The report was well received
by the committee members. During a meeting with Engineering and The Corps of Engineers,
alternatives were discussed on better protecting the SARI line by either relocating it out of the
river, or just protecting it. The committee will be updated as plans are developed.
(13) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS. IF
ANY
There were none.
(14) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
There were none.
(15) FUTURE MEETING DATES
Minutes of the Operations, Maintenance
and Technical Services Committee
September 7, 2005
Page6
The next Operations, Maintenance and Technical Services Committee meeting is scheduled for
November 2, 2005 at 5 p.m., as there will be no meeting held in the month of October due to a
conflict with the League of Cities' Conference.
(16) CLOSED SESSION
(17) ADJOURNMENT
The Chair declared the meeting adjourned at 6:15 p.m.
Submitted by:
Lilia A. Kovac
Operations, Maintenance and Technical Services
Committee Secretary
H:\dept\agenda\OMTS\2005\0905\090705 OMTS Minutes.doc
OMTS COMMITTEE Meeting Date To Bd. of Dir.
09/07/05 09/28/05
AGENDA REPORT Item Number Item Number
Orange County Sanitation District
FROM: Jim Herberg, Director of Operations and Maintenance
Originator: Dave Halverson, Senior Engineer
OMTS05-42 12(b)
SUBJECT: SOUTHERN CALIFORNIA EDISON AGREEMENT FOR SALE OF DISTRICT
GENERATED EXCESS ELECTRICITY AT PLANT 2
GENERAL MANAGER'S RECOMMENDATION
Authorize the General Manager to approve Amendment No. 2 to the Power Purchase
Agreement (QF 1098) with Southern California Edison Company, changing the type of
the Plant 2 power generating facility from small power producer to co-generator facility.
SUMMARY
• The purpose of this amendment to the power purchase agreement with Edison is to
allow alternative fuel blends at the Plant 2 Central Generation to facilitate the most
economic operation possible and meet all new air quality rules.
• The District has 30-year contracts with SCE for the purchase of excess power from
the District's two Central Generation Facilities. There are two types of facilities
allowed by the program ; co-generators and small power producers. The existing
Plant 2 contract classifies it as a small power producer which limits it to using only
digester gas for fuel.
• Compliance with new air quality rules and economic optimization of the Central
Generation operations may require the use of more natural gas at Plant 2 in the
future. Use of more than 15% natural gas at Plant 2 will violate the current
agreement with Edison.
• Amendment No. 2 will change the Plant 2 facility type to a co-generator that
operates without limitations on the use of natural gas. In return for this flexibility, the
agreement also reduces the payment rate for exported power in excess of historical
amounts. Exports in excess of historical amounts would only receive 88% of the
current contract amount.
PRIOR COMMITTEE/BOARD ACTIONS
• 8/22/01: Board approved an amendment to the agreement regarding repayment
of missed payments by Edison during the energy crisis.
• 2/27/02: Board approved a second amendment to the agreement regarding
repayment of missed payments by Edison during the energy crisis.
H:ldeptlagenda\Board Agenda Repons\2005 Board Agenda & Agenda Repons\0905\ltem 12(b).SCE Power Purchase Agreement.doc
Revised: 06/04/03 Page 1
PROJECT/CONTRACT COST SUMMARY
The value of exported power from Plant 2 for the fiscal year 2004/05 was $172,800.
Future power exports will almost be eliminated because air emissions restrictions will
only permit the engines to operate at 75% of their capacity. Because exports will be
eliminated in the future, this amendment will not have any cost impacts.
BUDGET IMPACT
[8] This item has been budgeted. (Line item: 41440)
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
The current operating philosophy for the Central Generation facilities at each treatment
plant is to match the treatment plant power requirements (load) with generated power
as nearly as possible using a combination of natural and digester gas. At Plant 1 the
load has exceeded the generation capacity and supplemental power is imported from
Edison. Plant 2 still has sufficient capacity for all plant loads.
The draft Strategic Energy Study (J-102) and the District approach to meeting tighter air
emissions rules, recommends that the Central Generation facilities burn only digester
gas except for peak shaving. It is more cost effective to buy power from Edison except
during the summer peak hours (noon to 6pm , weekdays) than using natural gas to
generate power. Another benefit to this method of operation is that digester gas
produces less emissions than natural gas.
The very high cost of Edison power during the summer peaks makes the use of natural
gas to generate power by reducing the amount of imported power, cost effective. This
may require burning more natural gas at Plant 2 than the current contract allows. The
amendment will provide the needed flexibility.
ALTERNATIVES
The current agreement with Edison is too restrictive and will reduce the operating
options for the District's power producing operations. It will likely prohibit the District
form producing electricity during peak energy periods.
CEQA FINDINGS
This item does not have any CEQA impacts.
ATTACHMENTS
None
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Repons\0905\ltem 12(b).SCE Power Purchase Agreement.doc
Revised: 06/04/03 Page 2
OMTS COMMIITEE Meeting Date To Bd. of Dir.
09/07/05 09/28/05
AGENDA REPORT Item Number Item Number
OMTSOS-43
Orange County Sanitation District
FROM: Robert Ghirelli, Director of Technical Services
Originator: Jim Colston, Legal & Regulatory Affairs Liaison
SUBJECT: Consent Decree -Biannual Report
GENERAL MANAGER'S RECOMMENDATION
Receive and file Biannual Consent Decree Report submitted to the Environmental
Protection Agency and Regional Water Quality Control Board regarding secondary
treatment compliance.
SUMMARY
12(c)
On September 1, 2005, staff submitted the second biannual report to the Environmental
Protection Agency and Regional Water Quality Control Board on the status of the
District's compliance with the requirements of the Consent Decree. The Consent
Decree contains both construction milestones and interim effluent limitations that are
required until construction of new secondary treatment facilities are completed by
December 2012. The Consent Decree was finalized by the federal district court in
January 2005, and since that time the District has maintained compliance with all of its
requirements.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
D This item has been budgeted. (Line item: )
D This item has been budgeted, but there are insufficient funds. D This item has not been budgeted. !Z1 Not applicable (information item)
ADDITIONAL INFORMATION
In order to provide an update on the status of construction activities related to new
secondary treatment facilities, the District staff has submitted the Engineering Report,
Engineering Capital Improvement Program: Program Biannual Report (January-June
2005). This report contains detailed information on the status of all projects related to
secondary treatment. The report was submitted with a cover letter which also details
the District's compliance with the interim effluent limitations and includes a required
certification statement. These reports will be submitted each March 1 and September 1
until the new secondary treatment facilities are completed and the Consent Decree is
terminated.
C:\Oocuments and Settlngs\kawai\Locat Se11111gs\Temporary Internet Files\OLK721ltem 12(c) Consent Decree Report.doc
Revised. 06/04/03 Page 1
During the January through June reporting period, the Sanitation District has maintained
compliance with all interim effluent limitations listed below. There were no construction
milestones during the reporting period; however, all secondary treatment tasks remain
on schedule for timely completion by the due dates listed below. The next scheduled
milestone is the completion of construction of trickling filters at Plant 1 (P1-76).
Interim Effluent Limitations
Compound Limit
Biochemical Oxygen Demand (BOD) 100 mg/L (30 day
averaqe)
Biochemical Oxygen Demand (BOD) 2,750 metric
tons/month
Total Suspended Solids (TSS) 55 mg/L (30 day
average)
Total Suspended Solids (TSS) 1 ,420 metric
tons/month
Construction Milestones (Remedial Actions)
Task
Complete construction of trickling
filters at Plant 1 (P1-76)
Advertise for construction bids for
Plant 1 secondary treatment facilities
(P1-102)
Advertise for construction bids for
Plant 2 secondary treatment facilities
(P2-90)
Complete construction of Plant 2
secondary treatment rehabilitation
(P2-74)
Complete construction of Plant 2
secondary treatment expansion (P2-
90)
Complete construction of Plant 1
secondary treatment expansion (P 1-
102)
Achieve full compliance with the
secondary treatment requirements
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
N/A
Due Date
March 15, 2006
November 15, 2006
January 15, 2007
January 15, 2009
November 15, 2012
December 31 , 2012
December 31 , 2012
C:\Oocuments and Settingslkawai\Local Set11ngs\Temporary Internet Files\OLK72\ltem 12{c) Consent Decree Repon.doc
Revised: 06/04/03
Actual Monthly Values
43.9 -53.2 mg/L
1, 162 -1,640 metric tons
33.9 -41.0 mg/L
798 -1 ,294 metric tons
% Complete
92% of construction is
complete -on schedule
Design Submittal 2 is 20%
complete -on schedule
Design Submittal 1 is 30%
complete -on schedule
Bid advertisement was
conducted in July 2005 -
on schedule
On schedule
On schedule
On schedule
Page 2
.-,
OMTS COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: Robert P. Ghirelli, D.Env., Director of Technical Services
Originators: Mark Kawamoto, Engineer
Meeting Date
09/07/05
Item Number
OMTS05-44
SUBJECT: FOG KITCHEN BEST MANAGEMENT PRACTICES SCREENING
INSPECTIONS
GENERAL MANAGER'S RECOMMENDATION
To Bel. of Dir.
09/28/05
Item Number
12(d)
(1) Establish an initial budget not to exceed $260,000 annually for the Fats, Oil and
Grease (FOG) screening inspection program of which the District's proportionate share
is estimated at a maximum of $12,000 per year;
(2) Authorize the General Manager to enter into an agreement with the County of
Orange for the provision of the FOG inspection program by the Orange County Health
Care Agency for three years, in a form approved by General Counsel; and,
(3) Authorize the General Manager to enter in agreements with each participating
Wastewater Discharge Requirement (WDR) Co-Permittee for inspections in their
service areas for three years.
SUMMARY
• In April 2002, the Santa Ana Regional Water Control Board issued General Waste
Discharge Requirements (WDR), Order No. RB-2002-0014, requiring northern and
central Orange County cities and sewering agencies (WDR Co-Permittees) to
implement fats, oils, and grease (FOG) control programs by December 30, 2004.
• The WDR Co-Permittees conducted a FOG Control Study (Study) to establish the
building blocks of such a program. Among the building blocks, the Study report
released in June 2003 identified a three-tier model FSE inspection program for the
Monitoring and Enforcement building block. The first tier was using the OCHCA
environmental health specialists (specialists) to conduct Kitchen BMPs screening
inspections as an expansion of their normal restaurant inspection duties.
• For the past 18 months, the WDR Co-Permittees have been working to secure the
services of the OCHCA's specialists. The County indicated a willingness to enter
into such a program if it were paid for the services rendered, which was estimated at
$260,000 for the first year and $237,000 annually thereafter for the hiring of two
additional specialists.
• The specialists would review the following Kitchen BM Ps at each facility: verify the
removal of the garbage disposal units; verify the use of drain screens; verify the
presence of kitchen signage outlining proper grease disposal and dry scraping of
dishes; verify the use of grease recycling containers; verify the presence of Kitchen
BMPs training records; review of grease maintenance logs or manifests; provide
education and outreach; and observe evidence of improper grease disposal within
the FSE.
• Presently, there are 16 WDR Co-Permittees interested in participating in the
program. A cost breakdown for the participating WDR Co-Permittees based on
population is shown in Table 1 attached. Under the proposed program, OCSD's
proportionate cost for servicing 145 FSEs in the Tustin area is approximately
$12,000 for the first year and $11,000 annually for subsequent years.
• The County also specified that it would work with OCSD as the lead administering
agency for the participating WDR Co-Permittees, i.e., the County will work directly
with OCSD, and OCSD will work with the other WDR Co-Permittees. OCSD will
also be solely responsible to ensure full compliance and completion by OCHCA of all
services within the scope of work. Furthermore, OCSD will be responsible for
payments of sums due under the terms of the service agreement with the County.
The County will bill OCSD quarterly for inspection services rendered.
• To establish such a contract, a service agreement between the County and OCSD is
required. This agreement is referenced hereafter as the "OCHCA Agreement." The
agreement shall remain in effect for three years, unless sooner terminated by the
County and/or OCSD.
• To fund the proposed new program with the County and to establish the terms and
conditions of the program, a companion funding agreement, hereafter referred to as
the "Compliance Coordination Agreement," between the participating WDR Co-
Permittees and OCSD must also be implemented. Under such an Agreement,
OCSD will invoice the participating WDR Co-Permittees annually for their respective
portions based on the costs 1) for each participating WDR Co-Permittee's
appropriate share and 2) for OCSD to administer the program. The term of the
agreement is three years, unless sooner terminated by OCSD and/or a majority of
the participating WDR Co-Permittees.
• As part of the "Compliance Coordination Agreement," the participating WDR Co-
Permittees agree to cooperate with OCSD and the OCHCA in the following ways:
• Provide information or records about the FSEs in their jurisdictions as
requested;
• Assist OCHCA specialists in gaining access to FSEs, including designating
OCHCA specialists as inspectors of FSEs under the participating WDR Co-
Permittee's FOG Control Program; and
Page 2
--
·'
• Enact appropriate regulations or ordinances to enforce the provisions of the
WDR that are substantially similar to OCSD's for uniformity in the regulations
to be enforced by OCHCA.
PRIOR COMMITTEE/BOARD ACTIONS
September 2004: Informational item to the OMTS Committee describing the WDR Co-
permittees' intention to enter into discussions with the County to solicit the services of
the OCHCA restaurant inspectors for the FOG program.
PROJECT/CONTRACT COST SUMMARY
The total cost of the program for the first year is about $260,000, and the cost for the
subsequent years is $237,000 each year. The difference between the first and
subsequent years is the additional start-up costs in the first year to establish the
program. As agreed by the participating WDR Co-Permittees, OCSD is allowed to
recover its administrative costs, but the estimated cost is ~ot anticipated to be
significant enough to drive the total annual cost of the program over the initial $260,000
estimate. Based on the current list of participants and their respective populations,
OCSD's share would not exceed $12,000 annually.
BUDGET IMPACT
D This item has been budgeted. (Line item: ) D This item has been budgeted, but there are insufficient funds.
[gl This item has not been budgeted for the $260,000. OCSD has budgeted for its
share, but the rest of the budget will be recovered from the participating WDR Co-
permittees.
D Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
1. Recommended action. Enter into an agreement with the County of Orange to
contract for the provision of FSE Kitchen BMPs screening inspection services by the
OCHCA for an amount not to exceed $260,000 annually. Also, enter into an
agreement with participating WDR Co-Permittees to coordinate contracting for
similar services with the County for each participating WDR Co-Permittee.
2. Each WDR Co-Permittee hires additional staff. Staff has appraised, as an
alternative to contracting the OCHCA specialists to conduct Kitchen BMPs
inspections, each WDR Co-Permittee employing additional inspection staff to do the
Page 3
work. While there is more direct control over such staff, this alternative is not
recommended for the following reasons: 1) WDR Co-Permittees would be creating
an additional burden to the FSE by subjecting the FSE to yet another agency
inspection, 2) WDR Co-Permittees do not have as much of a business relationship
with the FSEs as the OCHCA does, 3) much training on FSE kitchens would be
required since WDR Co-Permittees are not as familiar with FSE kitchens as the
OCHCA is, and 4) if each WDR Co-Permittee hired even one new inspector, the
overall aggregate cost is higher than the cost of the two new specialists OCHCA has
calculated it would require.
3. Alternative monitoring options. Staff has also appraised as an alternative other
techniques for monitoring Kitchen BMP utilization, such as through closed-circuit
televising (CCTVing) of the sewers or through periodic self-monitoring reports by the
FSEs. However, this alternative is not recommended, since CCTVing is a more
expensive and time-consuming activity, and self-monitoring reports, if not followed
up by periodic onsite inspections, may be falsified.
4. Do nothing. Staff has also appraised as an alternative doing nothing. However, this
alternative is not recommended since on-site inspection is critical for an effective
FOG Control Program. On-site inspections help ensure that the FSEs implement
the Kitchen BMPs necessary to help control discharges of FOG to the sewer and are
especially crucial if an FSE does not have some type of grease removal equipment
installed, which many currently do not.
CEQA FINDINGS
N/A
ATTACHMENTS
1. Table 1, Cost Breakdown by Participating WDR Co-Permittees for Kitchen BMPs
Screening Inspections
Page4
. -
Table 1 Cost Breakdown by Participating WDR Co-Permittees
for Kitchen BMPs Screening Inspections
Initial Vear
Service Area Population Share
Anaheim 292,994 $46,597
Buena Park 82,726 $13,157
Costa Mesa Sanitary District 116,703 $18,560
Fountain Valley 57,495 $9,144
Fullerton 129,157 $20,541
Irvine Ranch Water District 199,101 $31,665
La Habra 57,003 $9,066
City of Orange 128,674 $20,464
Placentia 44,375 $7,057
Rossmoor Los Alamitos Area Sewer District 22,072 $3,510
Santa Ana 341,216 $54,266
Stanton 45,877 $7,296
Sunset Beach Sanitary District 1,319 $210
Villa Park 7,847 $1,248
City of Yorba Linda 33,012 $5,250
OCSD (Portions of Tustin and
the unincorporated area north of Tustin) 75,260 $11,969
Grand Total 1,634,831 $260,000
Last Revised: July 13, 2005
Subsequent
Vear Share
$42,475
$11,993
$16,918
$8,335
$18,724
$28,863
$8,264
$18,654
$6,433
$3,200
$49,466
$6,651
$191
$1, 138
$4,786
$10,910
$237,000
'\,
\ OMTS COMMITTEE Meeting Date
9/07/05
AGENDA REPORT Item Number
OMTS05-46
Orange County Sanitation District
FROM: Nick Arhontes, Director, Regional Assets & Services Department
SUBJECT: EXTENSION OF CONSUL TANT SERVICES AGREEMENT WITH
LINJER INC.
GENERAL MANAGER'S RECOMMENDATION
To Bel. of Dir.
9/28/05
Item Number
12(e)
Approve Amendment No. 2 to the Consultant Services Agreement with Linjer Inc.,
providing for continuing consulting services to manage the completion of the Collection
Facilities O&M Division's Reinvention Project for an amount not to exceed $112,000
effective September 27, 2005 through June 30, 2006.
SUMMARY
The completion of the Division's Business Practices Reinvention Project is important to
staff operating and maintaining the collection systems at optimal effectiveness and
efficiency and in an integrated and aligned manner with in-plant programs that were
reinvented during the DART effort. It is also essential to establish the planned and
scheduled production program for improving our staff performance based management
program. In September 2003, Project work was expected to be completed in
September 2005. Staff went through a mandated downsizing effort in 1995-96 and
awaits completion of this retooling and reinvention effort in order to complete its long
range business and staffing requirements, and long range succession planning efforts.
Delays were encountered beyond the Division's control requiring that this amendment
be implemented. Causes for the delay included an approximate seven month loss of
time due to the Trunk Sewer Mapping Project; wet weather events this past winter
severely impacting staff's ability to participate in projects and priority impacts of
complying with our Regional Water Quality Control Board's Waste Discharge
Requirements (WDR), which were given high priority attention. The WDR Order
requires that we "shall properly fund, manage, operate and maintain" all parts of the
collection system.
The scope of work has been expanded and modified to include support for improving
practices in the treatment facilities requested by O&M staff. O&M staff requested
changes in their Maintenance Task Analysis (MTA) program (completed during the
DART effort based on the improvements now being implemented in this project.
In addition , OCSD is considering transferring the Surface Easement Management
Services from the Engineering Department to Regional Assets and Services. A process
mapping effort of the current and desired process will assist in defining staff and
services needs including legal support. It is necessary to complete this element of the
new work prior to developing the FY 06/07 staffing plan and operating budget
proposals.
H:ldept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 12(e).Linjer.doc
Revised: 06/04/03 Page 1
It is essential that OCSD maintain Linjer Inc. as manager of the consultant-driven, staff-(
supported project to ensure that work and continuity are maintained for a successful
completion of the project. Linjer's corporate knowledge of OCSD and our staff are very
valuable in completing this work as quickly as possible. Division staff does not have the
knowledge, skills and abilities or time to provide these services.
PRIOR COMMITTEE/BOARD ACTIONS
9/3/03 OMTS03-40 CONSULTANT SERVICES WITH LINJER INC. which initiated the
current agreement now expiring on September 26, 2005.
PROJECT/CONTRACT COST SUMMARY
Gerald Jones, as Linje r Inc., was retained by OCSD as a consultant for four years on
the DART effort and now two years on the Collection Facilities Business Practices
Reinvention Project. He was retained at a cost of $87.00 per hour for the last 24
months with no escalation . Travel expenses have averaged approximately $677 every
two weeks while he is on site for staff meetings and project work. The current fee
charged by Linjer for work on similar contracts for other public agency clients is $115.00
to $145.00 per hour, excluding travel costs. A fee of $96.00 per hour is proposed for
the remaining scope of work. Due to escalating fuel and hotel costs, a travel budget of
$800 every two weeks is estimated. Applying the $800 budget every two weeks over
the proposed period would be the equivalent of a $16.00 per hour added to the actual
proposed labor rate. Thus, for comparison purposes only, $96.00 plus $16.00 yields a
total equivalent rate of $112.00 per hour in the Orange County area.
Fees currently being paid to staff of the Integrated Project Management Consultants
(IPMC) being used on our GIP effort are ranging from $130.00 to $237.00 per hour for
Project Managers at various skill levels.
The $112,000 amount requested in this amendment includes the expected labor and
travel budgets. OCSD pays only the actual costs incurred on the invoice. Travel and
hourly costs have always been within the planned budget for each task.
Prior to being retained as a consultant, Mr. Jones worked as an OCSD employee. Prior
to his retirement in 1999, he worked for two years on the development of the treatment
plant's DART Implementation Plan and for one year on the plan's implementation.
The planned work breakdown by hours for the remaining work per this amendment is as
follows:
A. Collections Facilities O&M Division Project
1. Planned and Unplanned Maintenance Program Development
• Preventive Maintenance Program
• Condition Assessment Program (predictive maintenance)
• Collections Facilities Division Resource Analysis
2. Performance Management Program Review
H:ldeptlagenda\Board Agenda Repons\2005 Board Agenda & Agenda Repons\0905\ltem t2(e).Linjer.doc
Revised: 06104/03
Subtotal
130 Hours
190 Hours
70 Hours
90 Hours
480 Hours
Page 2
B. Collections and Plant Special Projects
1. Management of Document Change Process Development
2. Collections Facilities Policies and Procedures Development
Subtotal
C. Additional tasks to be added to existing tasks
40 Hours
110 Hours
150 Hours
1. Easement Program Assessment and Scope Definition 120 Hours
2. Develop Master Loop Schema for Plant Assets 120 Hours
3. Facilitate Development and Implementation MTA pilot project (in plant)80 Hours
Subtotal 320 Hours
D. Contingency for added hours to the above tasks as required 50 Hours
The contract cost is not expected to exceed $112,000. This reflects an hourly rate of
$96.00 per hour for an estimated 1,000 hours of service and estimated travel expenses
of $800.00 every two-week period. Travel expenses will be at cost plus 5% mark-up for
handling. The consultant will provide project management services with a minimum of
50 hours every two weeks.
The consultant will provide on-site project management every other week not to exceed
40 hours with the balance of hours to be used in preparation time for the next scheduled
on-site work period.
Staff time to assist on the various project and task teams, including attending meetings,
reviewing work products, and implementing outcomes, is included in the Division's
Operating Budget and will require additional planned hours to complete the proposed
work schedule.
BUDGET IMPACT
~ This item has been budgeted. (Line item: 94 Acct. 53240) D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
Work being completed at this time includes the following major groups of tasks:
1. Develop task descriptions for all the Collection Facilities O&M Division's standard
corrective, preventive and condition assessment tasks.
With field staff's input, developed, reviewed and approved the task descriptions for
each of the maintenance tasks needed to properly maintain the gravity system pipes
and pump station pressure systems, structures, grounds and equipment.
2. Review existing and/or develop and document the various non-destructive testing
and inspection processes required to support the condition assessment process of
OCSD's equipment and components.
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 12(e).Linjer.doc
Revised: 06104/03 Page3
The review with staff's input and approval included the following non-destructive
testing and monitoring technologies and/or methods:
a. Closed Circuit Television (CCTV) inspection of the gravity and pressure
sewers
b. Inspection process of the gravity sewer manhole structures
c. Vibration monitoring process of mechanical and electrical system components
d. Oil sampling and analysis process of mechanical and electrical system
components
e. Thermal imaging (Infrared) process of electrical systems
The condition assessment tasks for OCSD's static and dynamic assets have been
documented. The documentation includes workflow diagrams, descriptions of the
data-management processes, development of forms to support the data-collection
processes and procedures for conducting the work. The documentation is complete
except for the final procedures which are still in the development process due to
project delays. The procedures and supporting documentation will be on file to
serve as standards and guidelines for conducting the activities that comprise the
program.
3. Develop a methodology for estimating scheduled maintenance intervals and task-
time estimates for the planned maintenance activities that will support ongoing
monitoring of departmental, work group and individual work performance.
With staff's participation, a majority of the scheduled maintenance activities have
been documented and input to the CMMS. Task-interval and task-time estimates,
including travel time, have been assigned to each task to support resource planning
and aid in establishing performance categories and performance measures for the
department and contractors. Existing performance reports will be reviewed and
updated by staff using the new information.
4. Support staff in the development of a document change management process for
Engineering maintained record information systems that are accessed regularly to
support collection system and plant maintenance.
Facilitated staff meetings and workshops attended by Engineering Department,
O&M Department and Regional Assets and Services Department personnel to
develop, document and implement a change-management process to maintain, and
where possible, to improve the as-built condition of the existing record data and
drawing systems. The change-management process comprises the standards,
processes, procedures and tools necessary to support the as-built condition of
record drawings, the sewer atlas, electronic maps and various other information
systems maintained by engineering.
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 12(e).Linjer.doc
Revised: 06/04/03 Page4
J.
5. Develop a Business Risk Exposure Analysis (BREA) of the gravity sewer pipes.
A development team of Regional Assets and Services Department and Engineering
Department staff collaborated in a series of workshops to develop the business risk
exposure model for collection system gravity pipes. The workshops were conducted
to determine the probable structural and operational condition of the pipes.
Condition ratings were assigned based on staff's knowledge of the system, and
historical information on the repair and rehabilitation work that has been completed.
The initial model is nearly complete (waiting for hydrogen sulfide and operational
data entry into the model) and will be available for use in task scheduling in the near
future. The information in the model will be updated as data from condition
assessment becomes available for the subject components. A BREA model can be
developed for manholes as staff resources become available in the future.
Upcoming planned GIS work by others will be able to display the model's output by
illustrating the rating of each line segment in the gravity system.
6. Review and/or modify the existing trouble spot, siphon, regional and local sewer
system line cleaning tasks.
With staff's input, review and approval the collection system line cleaning program
has been reviewed and modified to more accurately reflect the desired long-range
medium and large diameter regional sewer line cleaning process. The activities now
identify the components that comprise each activity and reflect expected
measurement information that is required for improved staff performance monitoring.
All line cleaning activities, except the small diameter local sewer cleaning activities,
have been created and scheduled in the CMMS. The cleaning activities performed
by contractors have initially been scheduled at periodic intervals. These intervals
and associated task times will be adjusted as additional operational and structural
condition information is collected through the cleaning process. The local small
diameter pipe system line cleaning program development was delayed due to delays
in the project that provided collection system map information and supporting data
needed to populate the CMMS. The work on the small diameter pipe system line
cleaning program development has just started.
7. Conduct a Maintenance Task Analysis (MTA) of OCSD's pump/lift stations to ensure
the appropriate activities are scheduled and staff resources are available to properly
maintain them.
A facilitated review of the maintenance tasks in place to support the current pump
stations was conducted. The review resulted in the addition and deletion of various
tasks and modifications to the existing task descriptions. Each remaining task was
assigned an estimated task-time and scheduled based on the duty cycle of the
equipment. The task-times and scheduling intervals will be adjusted by staff based
on work history and equipment condition data as it becomes available. A review is
in progress to ensure that the appropriate parts for emergency and repetitive
preventive maintenance activities are readily available, and adequate staffing is
assigned to maintain the stations. Based on this work being completed the MT A
process will be conducted by staff in the future as new stations come on line or
existing stations are rehabilitated.
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Aeports\0905\ltem 12(e).Linjer.doc
Revised: 06/04/03 Page 5
ALTERNATIVES
1. Due to the past downsizing of staff, an internal program manager does not exist to
assume this work.
2. Discontinue work on this project and prepare a Request for Proposal for consultant
services. This alternative would result in a significant delay in our annual workplan,
integrating the work of all O&M and RA&S divisions, and achieving compliance with
the WDR Order.
CEQA FINDINGS
Not applicable for this work
ATTACHMENTS
None
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 12(e).Linjer.doc
Revised: 06/04/03 Page6
OMTS COMMITTEE Meeting Date To Bd. of Dir.
9/28/05
AGENDA REPORT Item Number Item Number
Orange County Sanitation District
FROM: Jim Herberg, Director of Operations and Maintenance
Originator: Doug Stewart, Asset Management Coordinator
SUBJECT: ASSET MANAGEMENT PROGRAM, JOB NO. SP-68-2
GENERAL MANAGER'S RECOMMENDATION
1) Receive and file Asset Management Plan 2005 prepared by Staff and GHD, LLC;
12(f)
2) Receive and file OCSD Asset Management Improvement Program Overall Roadmap
2005, prepared by GHD, LLC , dated June 2005; and,
3) Approve Amendment No. 2 to the Consulting Services Agreement with GHD, LLC
for Asset Management, Job Number SP-68-02, to continue services for a thirteen-
month period from July 1, 2005 to July 31, 2006 for an additional cost of $550,000
increasing the total amount not to exceed $918,000.
SUMMARY
The vision of OCSD is to be more cost-effective at designing, operating, maintaining,
rehabilitating, and retiring the large number of capital assets that we use to manage
wastewater, protect public health and the environment, and conserve natural resources.
To accomplish this vision , Staff has implemented an integrated management system
that we call asset management. This program has produced the following benefits so
far:
• We have a better system for deciding which capital projects have the highest
priority and whether we have the right scope in these projects. By quantifying
the risk and consequences of failures in our pipelines and treatment plants,
and implementing a more rigorous planning process, we have reduced our
projected GIP expenditures by $30 million over the next 10 years.
• We have a more informed estimate of the long-term replacement and
rehabilitation cost of our collection system and treatment plants. This
estimate was used in formulating our current rate structure and financing
plans to make sure that we are providing for long term needs.
• We have prioritized areas of our collection system that present the greatest
risks of structural collapse, hydraulic insufficiency, and blockages. This "risk
map" will allow us to be smarter about how and where we clean and inspect
our large sewers and where our capital repair and replacement funds should
be best spent.
• We are capturing knowledge from our most experienced workers who are
nearing retirement. We benefit from this effort in two ways : (1) we can make
more informed decisions about whether to repair or replace assets today, and
(2) we are building a history of asset conditions and performance for future
decision-makers who will manage our asset systems after the current workers
retire. Staff recommends the Board approve funding asset management
efforts for fiscal year 2005-06 including $550,000 for consultant support. The
work planned for 2005-06 with the estimated fees for consulting support are
as follows:
1. Capital Improvement Program Validation Process. This process will
improve upon the significant savings accomplished in the last two years in
selecting capital projects. It will include a more rigorous project
development process and risk-based decision making. Staff will learn
advanced life cycle cost estimating and business case evaluation
processes in order to justify each project prior to spending money on
design. In two years we have eliminated approximately $30 million from
the CIP budget through this effort. This process ensures the right
projects, at the right time, at the right cost, for the right reasons are being
recommended and implemented. ($105,000)
2. Implement Reliability-Centered Management. This effort will ensure that
as new facilities are brought on line the right operations and maintenance
procedures have been identified and are in place when construction is
completed. This will ensure that life-cycle costs have been thoroughly
studied, that our designs provide least life-cycle cost expenditures, and
that rigorous operations and maintenance input is available for the design
process. ($35,000)
3. A comprehensive Business Plan for the organization will be prepared
based on good asset management principles, such as level of service,
cost of service, appropriate risk, and customer expectations. This plan will
enable us to prioritize our highest value work and optimize the efforts of
OCSD's staff to make the best use of the public's funds. ($55,000)
4. Improve OCSD's ability to forecast and budget for our short term and long
term asset needs. This effort will provide more detailed assessments of
the condition of our assets than the initial expenditure forecast that was
included in the 2005 Asset Management Plan. ($185,000)
5. Conduct a Study to improve our Information Technology (IT) systems to
collect, update and share information to make good long term advanced
asset management decisions. This may involve future expenditures in
enhanced IT tools. ($170,000)
The consultant will be an advisor to OCSD staff and will supplement staff in
implementing asset management improvements. Although staff is becoming
proficient in the asset management techniques, outside help in implementing new
techniques is needed in order to continue to make improvements. This is because
assistance and support from experts, who have implemented these advanced
practices many times, increases staff's ability to implement improvements efficiently.
Page 2
Staff is also occupied with on-going day to day operational demands, and Consultant
support speeds up implementation by providing additional manpower.
In 2002, GHD/ Parsons was selected over 8 other firms to develop an Asset
Management Strategic Plan for OCSD. The plan was completed in 2003.
In 2003, staff presented an approach to the Board for continuing with GHD to
implement the recommendations of this plan. The Board decided to have this
implementation plan reviewed by an independent expert peer review panel. The
peer review was completed by the National Water Research Institute in October
2003, and staff modified OCSD's asset management recommendation based on the
panel's recommendations. Asset management planning efforts were shifted from a
consultant-oriented approach to a staff-oriented approach. The findings of the
independent peer review were mailed to the Directors in February 2004. Copies
were provided to the Directors in August 2005.
In April 2004, the Board approved a significantly scaled-back one-year contract with
GHD to support implementation of the recommendations contained in the Asset
Management Strategic Plan. Cost information is included in the attached Budget
Information Table.
PROJECT/CONTRACT COST SUMMARY
Prior expenditures under this project, SP-68-2, are $368,000 for consultant costs and
$250,000 for staff costs for the prior fiscal year, for .a total cost of $618,000. The current
authorization request is for $550,000 for consultant contract costs. It is estimated that
staff will devote approximately 4000 hours (amounting to staff costs of $400,000) for the
next year. Please refer to the attached Budget Information Table.
Prior expenditures on asset management under SP-68 are $455,617 for consultant
costs and $164, 177 for staff costs to produce the asset management strategic plan for a
total cost for the plan of $619,794.
BUDGET IMPACT
The total current Asset Management Program budget has been reduced from
$16,550,000 to $7,750,000. Please refer to attached Budget Information Table.
~
D
D
D
This item has been budgeted. (Line item: FY 2004-05 Budget, Section 8, page
138)
This item has been budgeted, but there are insufficient funds.
This item has not been budgeted.
Not applicable (information item)
Page3
ADDITIONAL INFORMATION
Background
The traditional way of doing business at OCSD -in which each department is focused
on its specialty, such as planning, or design, or construction, or operations and
maintenance is no longer viewed as the most effective. The following trends prompt us
to take a new look at how we manage:
• Our capital assets are rapidly aging and many are approaching the end of their
useful lives.
• In the next 1 O years we will almost double the number of assets that we own. The
systems and thinking that worked in the past will not continue to be as effective, or
successful.
• In the past, we have been fortunate to have assets that were within their range of
useful life and relatively easy to manage. We have had time to make impending
asset replacement decisions. In the future with older and more complex systems to
manage and decisions to make at an ever increasing rate, we will no longer have the
luxury, or safety factor, that we had in the past.
• The information that we have gathered to date on our assets may not be as rigorous
as we need in the future to make best long-term decisions for renewal and
replacement of the assets. Better information collection and decision making is
needed to ensure that we make the best decisions going into the future. The best
time to develop and implement the needed systems and processes is before we get
into trouble and need them.
• Historically, most of our budget and rate setting has been based on building new
capital projects to accommodate growth or to provide large wholesale replacement
projects. To be the best stewards of our ratepayer's resources, we need to be more
discerning with projects in the future to ensure that the public funds are most
efficiently spent on renewal, rehabilitation, and replacement of assets.
• We want to be more cost effective. The management systems that we use must
evolve to allow for the most effective decision making possible.
• The era of "trust the experts" is over. Staff must provide a more rigorous decision
making process that provides evidence and sound reasoning to assure the Board
and the public that our expenditures are needed and reasonable.
Asset management can help. Basically asset management is a form of applied systems
thinking -a way of thinking about complex systems and a set of tools to put those
thoughts into practice. The decision making processes within OCSD will be changed to
make more holistic decisions, from the perspective of the asset, and not just the
technical function of any individual department. Staff can better analyze all utility assets
to determine how to best meet our customer needs at the least total cost, with minimum
risk exposure.
Timeline
A time line of the implementation of our Asset Management Program is as follows:
Page4
t·
-•
April 2002-Approve contract with Parsons/GHD to produce Asset
Management Strategic plan with OCSD staff.
Dec. 2002 -Board adopts Asset Management Strategic Plan
April 2003-Board requests that a peer review of program be completed
after considering staff request for a consultant contract to implement
strategic plan.
Oct. 2003 -National Water Research Institute completes peer review
report noting that asset management is essential for OCSD to adopt and
that the program should be staff driven.
Feb. 2004 -Board reviews and accepts results of peer review report.
April 2004-Board approves initial contract with GHD to assist staff with
implementing a staff driven implementation approach.
May 2005-Board approves two-month extension of GHD contract to
complete work due to unforeseen illness of consultant.
In Fiscal Year (FY) 2004-05 five efforts were completed.
1. Development of an Asset Management Plan, which reports the current state
of our assets and projects our long-term expenditures;
2. The Asset Management Improvement Program, which is a project
implementation management plan,
3. Enhancements to our Capital Improvement Program Validation Process
resulting in a savings of over $30 million to date;
4. Pilot work in Maintenance with Reliability Centered Maintenance tools; and
5. Asset management staff training.
Consultant Support
It is planned that GHD services will be phased out over time as the development of our
asset management program matures. This is listed in the "Proposed Asset
Management Budget Breakout" table below. Each year the program will be brought
back for Board approval.
Page5
Proposed Asset Management Budget Breakout
Item Total Budget FY Year I$ Million
$Million 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11
GHD $2.1 $0.368 $0.55 $0.59 $0.392 $0.10 $0.10 -
OCSD Staff $5.65 $0.25 $0.40 $1.00 $1.00 $1.25 $1.25 $0.50
Total $7.75 $0.618 $0.95 $1.59 $1.392 $1.35 $1.35 $0.50
Progressive $0.618 $1.568 $3.158 $4.55 $5.90 $7.25 $7.75
Total
GHD is recognized world wide as leaders in asset management practice, including
Roger Byrne, who is principal author of the Intentional Infrastructure Management
Manual. GHD is a multi-national consulting business (14 countries, including the United
States). GHD brings worldwide best practices to OCSD that have been developed over
the last 15 years and that would be very difficult for staff to easily invent on our own.
Staff recommends continuing to use the GHD methodology for implementing advanced
asset management. The continuation of GHD services will be brought back for OMTS
Committee and Board approval every year. Over the next five years GHD services are
planned to be phased out as staff capabilities are built and can be utilized in this effort.
ALTERNATIVES
1. Adopt a slower implementation approach using little or no consultant support for
the Asset Management Program. The District would not realize the benefits of
the program as quickly under this alternative.
2. Stop implementation of the Asset Management Program. The District would not
realize the anticipated improvements in cost reduction, decision making, and risk
reduction.
CEQA FINDINGS
Not applicable
ATTACHMENTS
1. Budget Information Table
H:\dept\om\810\fields\AGENDA\Agenda Report (Asset Management-FINAL) Stewart 9-15-05 (Board Non Consent for 9-28-05).doc
Page6
Project Development
Studies/Permitting
Consultant GHD
Staff
Construction Contract
Construction
Administration
Construction
Inspection
Contingency
BUDGET INFORMATION TABLE
Asset Management Improvement Program
SP-68-2
$ $
$ $ -$
40% 550,000 $ 918,000 $ 368,000 $ 2,500,000 $ 2,500,000 $ (400,000) $ 2.100.000 1:~ $ 368,000 $ \ ......... ~--------t-~~---------r--~-----------t--------------1------------1
$ 10,550,000 $ 10,550,000 $ (4,900,000) $ 5,650,000 <: $ 846,000 $ 400,000 $ 1,246,000 $ 250,000 20% ·. ,.,
$ $
$ $
$ -. $
$ 3,500,000 $ (3,500,000) $
'"
Reimbursable Costs $ -$ -.)'.' $ ~..;;.;.;.;;;.;;.;..;;..;;.;.;;;.;..;....;.._;_~1----------+---------~~~~~......---------~At--~------+-~~~-----+--~--------+~------~-+---------1
TOTAL $ 16,550,000 $ 16,550,000 $ (8,800,000) $ 7,750,000 ;J: $ 1,214,000 $ 950,000 $ 2,164,000 $ 618,000 29%
C:\Documents af1elge1tings\kawai\Local Settings\Temporary Internet Files\OLK72\ltem 12(f) Asset Mgmt-Att 1
Orange County Sanitation District
Asset Management Plan 2005
Executive Summary
Vision Statement
'To maintain world-class leadership in wastewater and water resource management"
Asset Management Mission
"Create, maintain, and upgrade our assets in the most cost-effective and sustainable
manner, at the level of service required by present and future generations, at an acceptable
level of risk"
Executive Summary
Introduction
In December 2002 the Orange County Sanitation District (OCSD) Board adopted an Asset Management
Strategic Plan and Framework Analysis" (Strategic Plan). This Strategic Plan defined Asset Management for
OCSD as; "to create and acquire, maintain, rehabilitate, replace and augment these valuable wastewater
assets in the most cost effective {lowest life cycle cost) sustainable manner at the level of service required by
present and future generations of regulators and customers at an acceptable level of risk."
OCSD has taken several steps to achieve this vision since this Strategic Plan was adopted, including the
creation of this first Asset Management Plan. OCSD has developed this document to better understand its
short-term and long-term business obligations related to the assets that it currently owns and will own. It
also reveals how the business decisions related to these assets will affect the ability to sustain the asset
performance and consequently sustain the conditions of cost effective services to the customers. OCSD has
traditionally performed many of these tasks across the organization; however, the results of this work has
never been compiled into a single document to allow the organization to clearly understand the overall
business ramifications.
It is intended that the Asset Management Plan will be updated annually and continually be refined as part of
the annual ongoing asset management and business planning processes within OCSD.
Levels of Service
OCSD has developed a summary of its present and future Levels of Service requirements, which documents
the measurable outcomes, or key performance indicators that OCSD is committed to meeting under each of
the following categories; Environmental, Social, and Economic (the Triple Bottom Line). The Levels of
Service provided by OCSD will increase significantly as a result of the proposed $3 billion in new capital
expenditure and millions in increased maintenance and operations costs over the next seven years.
Some of the major Levels of Service that will change include:
• Adopting 100% Secondary Treatment Standards
• Increasing Reclamation to 70 mgd
• Adopting 100% Class "A" Biosolids
• Reducing Odor Complaints
• Fire and Safety Code Compliance
Inventory of Assets
Gaining a better understanding of the characteristics of the assets owned by OCSD is critical to the success
of wastewater service delivery. OCSD's assets can be broadly split between two main groups; Collection
System -the assets responsible for the collection and transfer of sewage from the customer's properties to
the treatment plants, and; Treatment and Disposal -the assets that treat the sewage and dispose of the
effluent and byproducts.
Orange County Sanitation District -Asset Management Plan 2005
,~
' []
The following charts present the investment history in both of these systems and the age profile of these
assets.
Figure E1 -Gravity Collection System (Weighted Average Life)
400 -.----------------------------------------------------.-35
-Gravity Pipe Construction
--Average Ago (By Replacement Value)
350 ·I · 30
300+------------------Jiil---------------------------~~--------I
25 / I I tcz3 I 7 _ .. , I... I ~ ··t
150 I
10
100 I
50 I lll . -El If-
O!" w NH r™ nmnnnn•pnwvnm••nnunnpw~pa mww•wmweunumwwuw pmp !O
~,~~/~~,,~,,,,~~'''~''#'~''''~,,~,#
Year
Figure E2 -Treatment Plants (Weighted Average Life)
250 30
-----~--~ am Plant Construction
--Average Age (B}' Replacement Value)
200 I
i ! 150 i 100
50
25
20 I ~ j\
15 f
<I:
10 I
5
0 ,.., .. ti,• m .,,.m MIN 'I' Iii IF, m, u,r;u Ria Pl u,m .... m ca m,u,n•,m PM •• Rf RIM Ml -gn .. "' .,_., w.•• -Mj., wt M..., .. , 0
,J!),bL\ 9 ... ,£!),.b ~rPJe.,"'((be.,~{(\e._OJ ... ,(!),t) l\,S, ... ,.£!1,b e..,./?) "'..tl'~
... ~ ... ~ ... ~J ... <13 ... <I' ... ~ ... ~ .._t/' ... ~ ... OJ .._OJ ... OJ ... OJ ... OJ .._cl' .._Cf!' .._Cf!' ... cl' ... C!J' ... <I' .._qJ ... '5" ... <I' ... '5"' # rpr rpr
Year
Orange County Sanitation District -Asset Management Plan 2005
[]
Asset Valuation
~ ~
An updated replacement valuation for all of OCSD's assets has been generated. The table below presents
the current replacement and depreciated values of OCSD's assets. The replacement value represents the
cost in 2005 dollars to completely rebuild all the assets to a new condition. The depreciated value is the
book value of the assets based on their current condition.
The current replacement value is estimated to be $5.388, which compares to the 1998 prediction of $2.038.
This will increase by 2012 to approximately $6.58 after the completion of the existing Capital Improvement
Prog ram. The major reasons for this increase include the addition of all the assets to the asset register and
basing the replacement costs on a built-up environment rather than a vacant land situation.
Valuation Plants Collection Total
Replacement Value ($8) 2.35 3.03 5.38
Depreciated Value ($8) 1.43 1.70 3.13
Planned Expenditure
A computer model was developed to produce the future expenditure aspects of this Asset Management
Plan . This model was used to perform a series of calculations on information related to the current and
future OCSD assets. The chart below is the result of the modeling work undertaken, including current and
predicted future Capital Improvement Program projects and operations (including maintenance).
The flat black line is the average of all the future cash flows which represents the average expenditure
($317M) required by OCSD for each of the next 100 years. The actual annual expenditure will vary
depending of the actual work required. At present the expenditure is greater due to the accelerated building
program, however, additional income in the future will also be required to pay back the capital that is
currently being borrowed.
Figure E3 -OCSD Expenditure -Total Future Predicted Cash Flows
600
500
-CIP ·Current Program l CIP • Predicted Future Program
-Operations I Maintenance I Overhead
--Average Expenditure
{
B 400
~ ~ 300
'
1 200
100
0
~ ~ ~ ~ ~ ~ § ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ es !9 N N
Year
Orange County Sanitation District -Asset Management Plan 2005
Future Funding Requirements
The predicted overall expenditure in future years will not "drop off" as dramatically as previously predicted
after the current Capital Improvement Program ends in approximately 1 o years. This means that pressures
on rate increases are likely to grow more than previously thought. Fully funding the replacement and
rehabilitation costs of the assets will mean that the likely scenario is significant rate increases over the next
20 years. In current dollars, the 2020 rate will be at the current average for all wastewater organizations in
California; however, the high majority of these agencies future rates will be expected to grow as well, if their
level of service is to be sustained.
Recommendations
It is recommended that OCSD:
• Continue to be more critical of the Capital Improvement Program projects based on economic justification
and risk presented to OCSD in order to free up available funds and staff resources to concentrate in other
areas of greatest risks;
• Validate in more detail the immediate 5 to 1 O year Capital Improvement Program;
• Validate the current and future maintenance program and workload with a view to investing in
maintenance where it will defer capital. Some observations have indicated that an increase in
maintenance expenditures could result in deferred capital investments and a reduction in life cycle costs
(this is especially relevant for civil type assets). Also, an increased understanding of the future
maintenance costs associated with capital projects will help to identify the potential impacts on the
maintenance program;
• Improving the existing data standards, processes and data collection programs;
• Developing an information system strategy to ensure that this data collection and data flow is stored and
recovered I manipulated to suit the needs of OCSD;
• Consider the need for a works management system and workload allocation I justification I prioritization
system for all Engineering, Operations and Maintenance activities.
• OCSD need to consider the ways in which it can start to influence customer expectations while working to
try and avert or reduce the impacts of these cost models. This will also involve a critical review of the
existing and planned Levels of Service.
Next Steps
Future editions of the Asset Management Plan are critical to the work OCSD is planning to undertake in
improving its overall asset management performance. Many of the improvements to future Asset
Management Plans will derive from other work planned to be undertaken across the organization. For
example, the Public Affairs department has developed an Asset Management Communications Plan. This
plan includes objectives with specific tactics to aid in facilitating organizational alignment. This will be
achieved through informing identified target audiences and conducting levels of service and customer
expectation surveys.
A number of other improvement tasks have also been identified for future years to improve the overall
accuracy of the Asset Management Plan.
Orange County Sanitation District -Asset Management Plan 2005
•
100
90
80
70
60
"' .5 ;;; 0:: 50
40
30
20
10
0 <;fl~·lfl' .. l;.J,';J-9:1<J R. -#' .,or v. ~' q qq · c>°' qq· ..,,<!!' '
R.'I' R.</J ~"'<R. q q (;~ q qq·
Orange C·ounty Sanitation District
Asset M~anagement Improvement Program
Overall1 Roadmap 2005
Based on the Asset Management Strategic Plan 2002
Final Report
-~ #' rft' ~~ ~I} ~"" {;>~· .,<A .f' ,<A ,§I -~<A ·,? f'' ·"' '~ ~<f {Ii .~· .. ~<SJ. '"'I' ~ "" ..... Ii' ,.:;; <i-{' '5'.p ,,II' ,.& ,,, ,,.,, '\'I' ~ .r:l'f',};,~ .#'~ </.;~ <?·,,.~· f?' f.f'\+·.,/"~ <:}.-' <5'~ ~i~:·
q qq' fr'qq' ' ,./' <;j . BAP
fJ' 0$'
~"J \ qq · Ir: ;;J J.Year Target
Secondary Elements t Ji Current
eo..r.o.nct
Lirul .........
~r.trE*-'tCmgotyol Crwbon an:! ~~lt.ltQ!tl U7)
1'161o..:W!A.WtPP10jloct
~~~twl'~.ft.41$--S
·. ··· ~O.~brb;JtU;ide191&~--"rpo.(ll
~~dht!J'Per•rs-~
~E~t_";>OllSf~l"UAl!J
~~~~,.~
~~·--~bf"~&_WWtd~l ......
~C<.--.....
SIB%i~IW.l·•~~IJ>bQ.fl:'Q -E---
l A•Pto;«tt
\. lntblkdift
•to1 .. )'Nn
IOll.ad\8/.P .__ .. «
Aal:PPfOiKI
npi.m.nuiton
AW'PTOJld1
~M:lt<llrllin! , ... ~
&:ii 5 d
June 2005
Introduction
Background
Following its successful District Assessment Reinvention Team Program the Orange County Sanitation
District (OCSD) realized the benefit of building on this work to include the new tools and techniques available
under Advanced (life cycle) Asset Management.
OCSD realized that this approach would allow it to further reduce future infrastructure costs, by optimizing
maintenance and validating capital for balanced decision-making and the development of future cost
effective strategies.
In May 2001 , OCSD embarked on its first steps into Advanced Asset Management with the development of a
Strategic Plan. This major study was undertaken over an 8 month period, and resulted in the production of
the report "Asset management Strategic Plan and Framework Analysis".
This report assessed the current performance of OCSD in terms of the quality of its asset management
performance and compared it with "best appropriate practices" that have proven to be economically
beneficial to similar agencies in other parts of the world.
This staff driven study identified the gaps in OCSD's current practices and determined those improvement
tasks that the organization considered warranted and justified. By using a business value chain (identifying
the areas representing the greatest benefits/savings to OCSD) developed by the project steering committee,
these gaps or improvement tasks were prioritized based on their estimated cost and the potential benefits.
The initial intent of OCSD was to progress this work using an external program manager (expert Asset
Management consultant) to deliver the program with staff playing a steering committee I overview role.
However, the OCSD Board reviewed this proposal, and following an "independent review committee" report
it was decided to proceed with a "Staff Driven" program prioritizing the recommended projects. It was
decided to seek assistance from an experienced Asset Management consultant who would provide expert
inputs and mentoring I agency strengthening through training and skills I knowledge transfer. OCSD would
decide on what improvement projects would be undertaken, in what order and over what timeframe.
This staff driven program commenced in April 2003 when improvement projects were undertaken in Capital
Improvement Program validation that enhanced project scope definition and reduces business risk exposure
that reduced the Capital Improvement Program and future life cycle costs. Three reports were completed in
a step-by-step approach. This initial work revealed that significant benefits could be derived from these new
approaches and tools.
In the 2004/05 fiscal year the Asset Management Steering Committee was formed. This committee was
given the responsibility to oversee this staff driven program. The Asset Management Steering Committee
decided to undertake four key projects as the in itial stage of their staff driven asset management
improvement program, namely:
86/10105/0211127 OCSD Asset Management Improvement Program -Overall Roadmap 2005
lfil!li h d
• The Development of the initial Asset Management Plan -This Asset Management Plan will enable
OCSD to complete a "state of the assets" report and develop a list of those assets that represent the
greatest risks to the agency.
• Capital Improvement Program validation process improvements. This stage Capital Improvement
Program work has continued to deliver benefits to OCSD with the latest work lifting the overall benefits
achieved to over $30 million.
• Reliability Centered Maintenance was a Pilot Study undertaken by the maintenance staff. This pilot
program has allowed staff to fully understand the benefits that could be achieved if this form of
maintenance analysis was used on selected assets and facilities throughout OCSD. With the high
workload currently being experienced with the large Capital Improvement Program the maintenance staff
are currently focusing their efforts in that area.
• Detailed Asset Management Improvement Program 2005 -This project is the management planning
activity that will allow all other projects to be fully integrated . Its principle benefit to OCSD will be the
orderly roll out of the future improvement projects, while ensuring that no project or project elements will
be forgotten.
This report covers the latter project. A flowchart of all key reports that have been completed is shown on the
inside cover of this report.
The initial intention of this Asset Management Improvement Plan Roadmap project was to develop a
program based on the original Asset Management Strategic Plan approved by the Board in 2002.
The "road map" developed in this strategy involves over 165 tertiary quality elements, as part of GHD's Total
Enterprise Asset Management Quality Framework. This in tum generated a list of 170 target improvement
projects. This approach gave OCSD an overview of the total resources required and associated timeline for
the completion of the initial improvement program. As stated previously it will be the Asset Management
Steering Committee and Executive Management Team that will determine the components of these projects
to be undertaken.
Since that time the Asset Management Steering Committee has developed a staff driven program built
around the immediate needs of OCSD and integrated this with its Unifying Strategies program. This Asset
Management Steering Committee I Staff Driven program is based on specific outputs that differ from the
priorities identified using the above Total Enterprise Asset Management Quality Framework process.
To meet the dual needs of th e program it was decided that the project should be split into two components to
ensure that OCSD had a clearly defined:
• Overall Roadmap Asset Management Improvement Program 2005 based on the original Strategic Plan
and Total Enterprise Asset Management Quality Framework outputs; and
• Staff Driven 2005/06 Budget Year Asset Management Improvement Program.
Please note that this report covers the Roadmap program based on the Strategic Plan. A separate report
has been delivered for the 2005106 fiscal year staff driven program.
8611010510211127 OCSD Asset Management Improvement Program -Overall Roadmap 2005 ii
teti1 § 1 @ ' . . . '
The Purpose of this Roadmap Plan
The purpose of this plan was to provide staff with an "Overall Roadmap" so that staff could consider the
overall program while concentrating on the immediate needs of OCSD with its annual "Staff Driven" version.
This will ensure that no parts will be forgotten even though they may not be completed in the order that the
original assessment perceived necessary.
It will also allow staff to better justify future resource needs if the improvement program is to meet the original
timelines envisaged.
A key issue for any staff driven program is the current staff workloads. In the case of the OCSD the current
workload is a significant issue. The large Capital Improvement Program (over the next 6 years) represents a
large workload for many groups especially those involved in asset building, dual operations, shutdown or
start up and hand over. The staff driven program has been constructed to better accommodate these
variables.
This Roadmap version of the futu re Asset Management Improvement Plan programs includes the following
sections or content for each of the improvement projects:
• Project name and number
• Objectives/Purpose
• Sub-projects
• Deliverables
• Benefits
• lnterconnectivities/Dependencies
• Scope of works including detailed task lists
• Resource requirements and budget.
Note: This last item is dealt with separately in the associated Microsoft (MS) Project database software
where all projects and resources have been allocated against the various tasks. Readers should avail
themselves of this software application to if they want to fully understand the timetable and scope of the
program.
These detailed Roadmap project sheets make up the balance of this report.
Budget I Cash Flow Implications
The Roadmap version was developed using the following guiding principles:
• This Roadmap version of the program is intended to get the OCSD equal to or above the interim target
improvement levels established in the Asset Management Strategic Plan.
• The Roadmap is aligned to provide the OCSD with "the best bang for the buck"
• The ultimate improvement level (degree to which the improvements are taken) will be under the control of
OCSD and the Asset Management Steering Committee. The Executive Management Team has
86/10105/02/11 27 OCSD Asset Management Improvement Program -Overall Roadmap 2005 iii
<e;11 h d
instructed that work should only proceed when staff believes that the work will derive adequate benefits or
returns on the investment to OCSD.
• The timeframe over which this was considered achievable was developed in conjunction with the Asset
Management Steering Committee. It runs from the original 2004/05 fiscal year through to the 2010/11
fiscal year. The staff believes that this order of program is capable of being completed.
• That the ratio of staff inputs to expert consultants should be of the order of 4 to 1.
• That the overall estimate for this roadmap program is in accordance with the Asset Management budget
expenditure of $7,750,000 as shown in Table 1.
• It shoul d be noted that the costs related to the Asset Management activities have been separated from
the costs related to other program areas, which will be funded from separate sources. These have been
included to present a clear picture of the likely overall cost of the program. These include:
-Data collection
-Information Systems (Software and Hardware)
• The key points of interest in the table are:
-An allowance of $3.0 million has been made for data collection activities that can be more cost
effectively carried out by contractors rather than employing key skilled staff on this type of activity.
The OCSD staff will determine when and how this will be expended based on the needs identified
during the development of the program and their available resources I workloads.
-An allowance of $4.0 million for new and enhanced software applications related to the Asset
Management Improvement Program. A major study will be undertaken in the 2005/06 program to fully
identify, scope, cost these improvements and develop the benefits I business case to justify that
investment.
-An allowance of $1. 7 million for new hardware and communications systems to support the trials of
mobile computing and the improved access to the Computerized Maintenance Management System
for maintenance staff.
-Th e ratio of staff to consultants has been attained. However, it should be noted, that the work
completed by the consultan ts will be finished earlier than the application of these improvements by the
staff driven aspects of the program.
-It should be noted that the consultants are working themselves out of a job as required by the
Executive Management Team .
8611010510211127 OCSD Asset Management Improvement Program -Overall Roadmap 2005 iv
caff1 § iii
Table 1 Total Asset Management Improvement Plan Roadmap Budget
Total Budget Fincancial Year($ millions)
($million) 2004105 2005106 2006107 2007108 2008109 2009110 2010111
Asset Management
GHD Mentoring $2.1 $0.35 $0.55 $0.60 $0.40 $0.10 $0.10
OCSD Staff $5.65 $0.25 $0.40 $1.00 $1 .00 $1.25 $1 .25 $0.50
Asset Management Total $7.75 $0.60 $0.95 $1.60 $1.40 $1.35 $1 .35 $0.50
Other Programs
Data Collection $3.0 $0.60 $0.60 $0.60 $0.60 $0.60
Software $4.7 $1 .00 $1 .00 $1.00 $1.00 $0.70
Hardware $1 .0 $0.30 $0.50 $0.20
Other Programs Total $8.7 $1 .90 $2.10 $1 .80 $1 .60 $1 .30
GRAND TOTAL $16.45 $0.60 $0.95 $3.50 $3.50 $3.15 $2.95 $1.80
PROGRESSIVE TOTAL $0.60 $1.55 $5.05 $8.55 $11.70 $14.65 $16.45
Notes:
1. 2004/05 -Costs to date
86/10105/02/1127 OCSD Asset Management Improvement Program -Overall Roadmap 2005 v
rrrni
§ 1 fl ~
-. -
The Role of the Asset Management Consultant I Mentor
The principle role of the Asset Management Consultant I Mentor is to work in "partnership" with the staff
teams to:
• Produce the necessary guidelines, specialized tools and training materials;
• Train staff in the use of these guides and tools;
• Set up the optimal implementation program and target this work to the assets or asset types that are most
critical to the OCSD and the particular divisions;
• The consultants work themselves out of a job -passing the necessary skills and support materials onto
the staff to ensure sustainable Asset Management within OCSD; and
Figure 1 shows the way in which the consultants are phased out and OCSD staff complete the program.
Figure 1 Asset Management (2004 to 2011 ) -OCSD Staff and GHD Mentoring
$1.80 -
OCSD Staff L
$1.60 --• GHD Mentoring :
U> $1.40 J__ -
c: 0 ~ $1.20 ..._! _______ __,
E
~$1.00 .... Q) .g> $0 .80 _.__ ___ _
::::s ca
~$0.60 -... (lJ
Q) >-$0.40 -·
$0.20 -
$0.00
2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11
Financial Year
86/10105/02/1127 OCSO Asset Management Improvement Program -Overall Roadmap 2005 vi
lcJ ;ii 5 1
The Management of the Program
The Asset Management Steering Committee and other OCSD staff involved will have complete control over
the program and will vary it to suit:
• The information and issues revealed by discovery. This is critical to the overall success of the program
as the real issues and costs impacting on OCSD are learnt;
• The order, in which the work is done, based on the best potential benefit to OCSD; and
• The degree to which it is implemented (for what staff, which processes and applied to which assets).
In short the Asset Management Steering Committee can decide, how far, how fast and which track they take
down this roadmap to reach their ultimate destination.
The MS Project Application and Database
The following section of the report covers the descriptive sections relating to all projects and their sub
projects or major tasks.
This is supplemented by a complete MS Project plan containing the schedule and resource estimates that
are the basis of this program (Appendix A). An electronic copy of the MS Project plan is available on the
OCSD intranet site under Asset Management / Improvement Program I Overall Roadmap.
The following should be noted:
• As OCSD has commenced its improvement tasks, several of the project tasks have been completed as of
the completion of this report. Those improvement tasks that have been completed are shown in bold as
illustrated in Figure 2.
• The improvement tasks or sub projects are ordered in ascending priority. Unlike most MS project Gantt
charts these project move up to suit the improvement charts or "thermometer graphs" used in developing
the Asset Management Strategic Plan. This protocol has been used to allow staff to easily make the
linkages between the Total Enterprise Asset Management Quality Framework and the adopted
improvement program. Figure 3 illustrates an example of this.
86/10105/02/11 27 OCSD Asset Management Improvement Program -Overall Roadmap 2005 vii
f
ta:11
h d
Figure 2 Example of Completed Improvement Tasks in Bold
1.1.1 Sub Projects:
The following list of sub projects contribute to the achievement of best appropriate practice in
this area. Those highlighted in bold have been completed.
Monitor and Report Annually
Complete Customer Charter and Service Levels
Complete Customer/Stakeholder/Consultation Policy/Training
Complete Past Histories and Predictions High -Low
Set Up Full Demand Sub Elements and Policy
Complete Customer Survey Guidelines/Training
Identify Demand Drivers and All Sub-Elements
Document Levels of Service and Demand Data Flows
Produce Demand Analysis Guidelines and Policies/Training
Undertake Review I Needs Analysis and Develop Improvement Strategy
Further Staff Undertake Intermediate Training in This Quality Element
Purchase Appropriate Texts and Collect Examples Of This Quality Element
Undertake Basic Training for Some Staff
Figure 3 Example of MS Project Plans (Resources and Timing Requirements)
0 ·--
:J
=~ !4
' :J :J
I ~~
• 3 , 3
' :J
n =~
_ ... _._.._ ........ '"' -...... .,,......,.,.,.u.A
~ ..... -..... -1o1-. ......... ,, ..... ] ·-·r-·•<--•'"oJ"''"' ,_, C·,..--H.._ .,.,_ ........ u-.• r ... o-
,..,.. •• <--"#-· ... .--...... .-......... ,
,_.~_..lo .. ,..., ..... ,_..,_,,.•••'-• ..,....,._. ...... r , ··-....... , ..... t•·· ... ---... 1 ......... ,,.,..,._,,_,
IJ 3 5\••'"'•a.rt•u••••t•.-..t -•I_ .. ,.,..,.,._,,_
.. 3 •. _, ... "" .......... , ...... --·
_,,_.....,,,_..-..... , ...... r ..... .,
( ...... , .. .__ .• , .... '11 .. -
""""'"""°"""'"" .. "V''--'"•ill••· .,..,,,,. .... ~ •• , ... 1t•IJ1o•I-...,,~ I·•"
,.,_,.., .. ~,,t.Mc...1• ~,,,. ,.,. ""''''"'' "'"'"""'W-.,..•I .. , , ... .....,..,..a,.._..,,._.., •. ...,,_., ... ,.,.._,_,
......... (1 .............. 9'tr-...... ,.. •• ,.. .,_
''"""'""--" ... __ .,. .... 11_ .. , tt«Co<-•'"""'..,. ,..,.,..... ..... ~...._ ....... _ ............ .....,,,..~.·...-.1-
i\or-·~/ofc•'V• .. ·•·1·-v-•t -···~11 .... ,.,.....L-•
,.._,_ ... t;i.o ... ,,_ ...............
,. ..... ...... _ ...... _ ................ .
l! 3 ,.....,,.~~ ... ,.,.. .. ,,, ..... h' -M>rt .... 11...-•H••"' ...,._..,, n 3 .... ,.., ............. _.,,,,._, , ..... ,,, ... 1 ........... ,
)I 3 ,..,,_,. ""'-u ........ ., • .,tf..,_, • .,,,,.,\,...h•".,
>'l 3 t .... l.M.f> ............ ....,,.,. .... ~ ........ I' ............ ..
"A' 3 I wr,. ~.1o., • ...,._."· ly~-,., ..... ..
,, 3 l.._., ....................... to•J •"'"'''"+. ....... .
W, -~ fOno".t'. ... 'fll,,._4_,,~ •. ltr·•t. (IOoH-.UI
)1 ':"i u..a.u,..~ ...... iu~•~"-""~'""-"•'""·"''' .. "'.I •!J :3 t~·~>;,6,-·~·-·· ..... " :i v......,...,~·-11.,..J.J.<~·,~ ... 11 ........ _._..,,:;a,.,,.,,,. •: -~ lwt""'~...,,ll'<W\olt•..,_....,._,,,.,,..,.,n, .....,.,0.-.1
11 3 "-'~···•"'•''''"-·'•11"'"'~ ..... ,t _.. .,lT111<:.....~0i-·
H =i 1.1-100.D.!l.lt""""""''l..o-•~' .. 1
= =
= """' =
= = =
=
= = =
= = =
= = =
= = =
= = =
86110105/02/1127 OCSD Asset Management Improvement Program -Overall Roadmap 2005 viii
\
MINUTES OF PLANNING. DESIGN. AND CONSTRUCTION
COMMITTEE MEETING
Orange County Sanitation District
Thursday, September 1, 2005, at 5 p.m.
A meeting of the Planning, Design, and Construction Committee of the Orange County
Sanitation District was held on Thursday, September 1, 2005, at 5 p.m., in the Sanitation
District's Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
PDC COMMITTEE MEMBERS:
Directors Present:
Tod Ridgeway, Chair
Norm Eckenrode, Vice Chair
Alberta Christy
Larry Crandall
Jill Hardy
Patsy Marshall
Darryl Miller
Harry Sidhu
Steve Anderson, Board Chair
Directors Absent:
Charles Antos
Jim Ferryman
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were none.
(4) REPORT OF THE COMMITTEE CHAIR
STAFF PRESENT:
David Ludwin, Director of Engineering
Bob Ghirelli, Director of Technical Services
Jim Herberg, Director of O&M
John Linder, Engineering Manager
Matt Smith, Engineering Manager
Tod Haynes, Construction Manager
Dave May, Project Manager
Bob Schirripa, Project Manager
Wendy Sevenandt, Project Manager
Doug Stewart, Utilities Management Specialist
Olga Cervantes, Principal Contracts Administrator
Jennifer Cabral, Public Information Specialist
Gail Cain, Acting Committee Secretary
OTHERS PRESENT:
Director Carolyn Cavecche
Jeff Heden, J.C. Heden & Assocs., Inc.
Randy Wyman, Bureau Veritas
Committee Chair, Tod Ridgeway, did not have a report.
PDC Committee Minutes
Page2
September 1, 2005
(5) REPORT OF THE GENERAL MANAGER
Bob Ghirelli, Director of Technical Services, gave an update on Hurricane Katrina and of a
possible response by the Orange County Sanitation District (Sanitation District). He advised that
we have been contacted by several organizations, including the Red Cross and Orange County,
seeking mutual aid. Earlier this week, Blake Anderson, General Manager, talked with Chairman
Anderson and they agreed we would see what we could do to help. In the last few days, there
has been discussion on the possibility of sending some members of our Medical Response
Team who are trained in CPR, safety, and first aid, and we may also be sending packaged
meals. We have been contacted by the Orange County Emergency Response Center that is
organizing donations of food or money, which we also plan to do. Within the next few days, we'll
know how many people we might be sending in response to this mutual aid request. Eventually,
there will be other requests for equipment or sewer line cleaners, but right now, the immediate
need is to rescue people and handle the recovery phase.
(6) REPORT OF THE DIRECTOR OF ENGINEERING
David Ludwin, Director of Engineering, advised that there were no items on the consent calendar this
month.
He discussed the meeting with SAWPA, the County, and the Corps of Engineers regarding the
alternatives for the protection and/or relocation of SARI and the lack of money to complete the
construction.
He informed the Committee that the design of the emergency repairs to the SARI were out to bid and
reminded them that the Board had delegated the award of a construction contract to the General
Manager.
Tod Haynes, Engineering Manager, discussed the results of the pipe bids for Job No. 1-2-4. Bids
were received for Job No. 1-2-4-P, Bushard Trunk Sewer Pipe Procurement, on August 25, 2005. In
order to support the schedule to restart the project early next year, staff is requesting permission to
go directly to the September Board to award the contract to Ameron Pipe Company. The Engineer's
Estimate was $12,000,000. Bids were received from Ameron Pipe ($7,699,777) and Rinker Materials
($14,842, 140). HOBAS Pipe also submitted a bid at approximately $7.2 million. The bid was found
to be nonresponsive by staff. Based on awarding the contract to Ameron, and estimates of future
credits from Rados on the original contract pipe not yet installed, staff currently projects that the
additional cost for specifying and providing new pipe for the project is approximately $2.3 million. In
accordance with the settlement agreement, the Sanitation District has reserved the right to seek
recovery of these costs from Rados in the future. The settlement agreement caps the Sanitation
District's right to recover these damages at $8 million. Director Miller requested that staff have Boyle
provide an opinion on the bids, and that the Board Agenda Report address the large discrepancy
between the two bids. Otherwise, there were no objections to taking the award directly to the Board.
At the request of the Committee at their August meeting, Matt Smith, Engineering Manager, reviewed
the QA/QC process used for Job No. P2-66 and the resulting comments that were generated. He
offered to review comments in detail after the meeting with any Directors who were interested.
Mr. Ludwin reviewed the Bi-Annual Engineering CIP Report and highlighted several
accomplishments over the past year.
I
'·
1 PDC Committee Minutes
~ Page 3
September 1, 2005
(7) REPORT OF GENERAL COUNSEL
General Counsel was not present.
(8) CONSENT CALENDAR
a. It was noted that Item PDC05-85, Book Page 13, 2nd paragraph, 2nd sentence, should
read Directors "moved and approved" the item be tabled, rather than "requested."
On Book Page 14, Item No. 12, it was asked when the report on DBO constraints would
be presented to Committee members. David Ludwin advised that this report would be
presented at the October PDC Committee Meeting and General Counsel will be invited to
provide the legal perspective on the issue.
Receive, file, and approve minutes of the August 4, 2005 Planning, Design, and
Construction Committee Meeting as corrected.
Director Hardy abstained on the minutes.
b. CHANGE ORDER REPORTS
Attached is the Monthly Change Order Report and the Report of Construction Contracts with
Potential Change Orders over Five Percent (5%). This is an information only item. Action on
change orders that require PDC Committee or Board approval will be taken separately.
There are four change orders this month for PDC Committee approval.
c. PSA AND AMENDMENT REPORT
Attached is the PSA and Amendment Report. This is an information only item. Action on
PSAs and Amendments that require PDC Committee or Board approval will be taken
separately. There were no PSAs and no Amendments approved by the General
Manager from July 22 through August 18, 2005.
d. FACILITIES ENGINEERING CONSULTANT ACTIVITY REPORT
Attached is the Facilities Engineering Consultant Activity Report. This is an information
only item.
e. SANTA ANA RIVER INTERCEPTOR RELOCATION AND PROTECTION STATUS
REPORT
Attached is the Santa Ana River Interceptor (SARI) Relocation and Protection Status
Report. This is an information only item.
f. BUSHARD TRUNK SEWER REHABILITATION REPORT
Attached is the Bushard Trunk Sewer Rehabilitation Report. This is an information only
item.
MOTION: It was moved, seconded, and duly carried to approve the recommended
actions specified as Items 8(a) through (f).
PDC Committee Minutes
Page4
September 1, 2005
END OF CONSENT CALENDAR
Consideration of items pulled from Consent Calendar:
(9) INFORMATIONAL ITEMS
a. PDC05-87 Asset Management Program, Job No. SP-68-2.
Director Eckenrode made a motion to not have staff give a presentation
on the Asset Management information item. The motion was seconded
by Director Miller, and Director Marshall agreed.
Jim Herberg offered to skip the presentation and just answer questions.
Director Anderson asked if the Sanitation District needed to have an Asset
Management Program in order to secure funding for our CIP. Mr. Herberg
indicated that Asset Management is a requirement to receive state
funding under Proposition 50. Director Miller asked if as-built drawings
and an asset database were part of the proposed contract with GHD.
Doug Stewart indicated that as-built drawings are not part of the proposed
contract, and that some database development is done by the consultant
and some is done by staff. Director Miller asked if the Asset Management
Consultant Budget was ramping up to match the CIP. Doug Stewart,
Utilities Management Specialist, indicated that the proposed ramp up in
Asset Management consulting costs was independent from the CIP
costs. Director Miller stated that he supports Asset Management, but that
the proposed consulting fee is much higher than IRWD's costs for a
similar program. Director Marshall inquired about a message from the
General Manager regarding an Asset Management Workshop. Staff did
not have any further details regarding the workshop. Director Marshall
also asked whether the proposed budget for consulting fees of $2.5
million had been approved. Staff indicated that the funds were included in
the 2005-06 Budget, but that a contract amendment for additional
consulting fees for 2005-06 has not been approved by the Board. Director
Cavecche indicated that Staff was concerned that the Asset Management
program could not be implemented without consulting help. Mr. Stewart
indicated that Staff believes that the program could be implemented
without the consultant, but that it would take longer to implement.
(10) ACTION ITEMS (Items a-h)
It was asked that Item No. PDC05-94 be moved to the beginning of the Action Items.
g. PDC05-94 Amendment No. 4 was requested for additional services. Additional fees
were requested for three main items: redesign of the Bushard Diversion
Box, tunnel design phase services, and project schedule extension. Total
fees requested by Malcolm Pirnie, Inc. were $999,979. However, staff
recommended awarding $899,979 because $100,000 of this amount had
been "advanced" by the Board in August 2005.
' '
'f PDC Committee Minutes
Page 5
September 1, 2005
Questions were raised regarding fees requested for project schedule
extension and for the need for tunneling. After answers and clarifications,
the Directors recommended awarding the amendment as presented.
MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 4 to the Professional Services
Agreement with Malcolm Pirnie, Inc. for Rehabilitation of Ellis Avenue
Pump Station, Job No. 1-10, providing for additional design engineering
services for an additional amount of $899,979, increasing the total amount
not to exceed $4,799,255.
a. PDC05-88 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ( 1) Ratify Change Order No. 2 to HVAC Replacement for
Operations Center at Plant No. 2, Job No. FE02-62, with Bon Air, Inc.
authorizing an addition of $4,841, increasing the total contract amount to
$216,549; and (2) Accept HVAC Replacement for Operations Center at
Plant No. 2, Job No. FE02-62, as complete, and authorizing the Final
Closeout Agreement.
b. PDCOS-89 Staff requested this item be removed from the Agenda.
c. PDCOS-90 MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify Change Order No. 22 to Primary Clarifiers 16-31 and
Related Facilities, Job No. P1-37, with Margate Construction, authorizing
an addition of $48,078, increasing the total contract amount to
$71,756,818.
d. PDC05-91 Director Anderson asked if staff intended to seek reimbursement in
regards to Item 7 from Level 3 for fiber optic cable interference. Staff
responded that they would consult with General Counsel on the issue.
MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to ratify Change Order No. 5 to Gisler-Redhill Trunk
Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk
Improvements, Contract No. 7-41; and City of Tustin Project Nos. 6106
and 6151, with ARB, Inc., authorizing an addition of $209,252 and 21
calendar days, increasing the total contract amount to $20, 169,324.
e. PDC05-92 Recommend to the Board of Directors to approve a Professional Services
Agreement with Carollo Engineers for studies, design and construction
management services for Headworks Rehabilitation/Refurbishment at
Plant No. 1, Job No. P1-71, for an amount not to exceed $1,365,997.
The PDC Committee questioned the costs of the recommended
consultant and felt the additional cost was not justified.
MOVED, SECONDED, AND DULY CARRIED: Direct staff to resolicit
proposals.
PDC Committee Minutes
Page6
September 1, 2005
f. PDC05-93 Steve Anderson, Board Chair, asked about one of the elements of the
proposed PSA amendment. Specifically, Director Anderson questioned
why staff wanted the subconsultant for the inspection of the existing
domes ($90, 110) to be contracted through Malcolm Pirnie, the prime
consultant. Mr. Schirripa, the Project Manager for Job No. P2-80,
addressed Director Anderson's comments by providing additional
information. This satisfied Director Anderson's questions, but also
convinced him to have the Sanitation District pursue a direct contract with
the inspection company. Director Anderson went on to say that he
thought that this type of subcontracting could bring with it some
improprieties and that the Sanitation District should consider a direct
contract arrangement. Members of the PDC agreed with Director
Anderson's assessment and directed that this particular element be
removed from the PSA amendment. The Committee voted on the
remaining elements of the amendment and passed it with the exception of
the existing dome inspection. The Committee further approved the
authorization of the General Manager to enter into a sole source contract
with Temcor, the dome inspection company, for $90, 110.
h. PDC05-95
MOVED. SECONDED, AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 1 to the Professional Services
Agreement with Malcolm Pirnie, Inc. for Primary Treatment Rehabilitation
and Refurbishment, Job No. P2-80, providing for modifications to the
Scope of Work for an additional amount of $829,984, increasing the total
amount not to exceed $6,608,502; and,
FURTHER MOVED: Authorize the General Manager to execute a sole
source Purchase Order with Temcor in an amount not to exceed $90, 11 O
for the inspection of the existing Geodesic dome covers on the Primary
Clarifiers at Plant No. 2.
Staff reported that specialized inspection services were required to assist
staff in inspecting a protective coating for manholes that have not been
used at the Sanitation District previously.
MOVED, SECONDED AND DULY CARRIED: Recommend to the Board
of Directors to approve Amendment No. 6 to the Professional Service
Agreement with Tran Consulting Engineers for additional construction
support services for Sunflower Interceptor Manhole Rehabilitation,
Contract No. 7-21, for an additional amount of $29,600, increasing the
total amount not to exceed $614,295.
Director Marshall abstained.
(11} CLOSED SESSION
There was no closed session.
I
\ ..
PDC Committee Minutes
Page 7
September 1, 2005
(12) OTHER BUSINESS. COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS. IF ANY
There were none.
(13) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(14) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(15) FUTURE MEETINGS DATES
The next Planning, Design, and Construction Committee Meeting is scheduled for Thursday,
October 13, 2005, at 5 p.m.
(16) ADJOURNMENT
The Chair declared the meeting adjourned at 7:10 p.m.
Submitted by:
,· Acting PDC Committee Secretary
H:\dept\eng\PDC\PDCOS\Sep\090105 Draft PDC Minutes.doc
.
ll ...,
\-'
PDC COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: David A. Ludwin, Director of Engineering
Originator: Chris Macleod, Project Manager
Meeting Date To Bd. of Dir.
09/01/05 09/28/05
Item Number Item Number
PDC05-88 13(b)
SUBJECT: HVAC REPLACEMENT FOR OPERATIONS CENTER AT PLANT NO. 2,
JOB NO. FE02-62
GENERAL MANAGER'S RECOMMENDATION
(1) Ratify Change Order No. 2 to HVAC Replacement for Operations Center at Plant
No. 2, Job No. FE02-62, with Bon Air, Inc. authorizing an additional $4,841, increasing
the total contract amount to $216,549; and (2) Accept HVAC Replacement for
Operations Center at Plant No. 2, Job No. FE02-62, as complete, authorizing the Final
Closeout Agreement.
SUMMARY
• The project is for the installation of a high efficiency HV AC system to replace the
existing HVAC system. The project will include replacement of the controls system
and replacement of dampers, ducting, and other pertinent infrastructure, as
necessary, to accommodate the new system.
• The existing HVAC unit has been in service for 20 years, and is now obsolete,
inefficient, and costly to maintain. Some of the ductwork and dampers on the unit
are severely corroded.
• CGvL Engineers (now HOR) prepared the plans and specifications and the contract
was awarded to Bon Air, Inc. on July 1, 2004.
• Change Order No. 2 includes two items of added work to Job No. FE02-62. There
are no reimbursable design errors and two non-reimbursable design errors
associated with this change order. The contract includes liquidated damages of
$200 per day and no bonus provisions.
Contract Schedule
Contract start date
Original contract completion date
Total number of change orders to date
Current contract completion date
Revised completion date
Days subject to liquidated damages
Actual contract completion date
January 12, 2005
July 10, 2005
2
July 10, 2005
NIA
NIA
July 10, 2005
Page 1
Change Order No. 2 Content
Item Description Amount Days Type
1 Mechanical Modifications $ 2, 115 0 Non-Reimbursable Design Error
2 Hot Water Pump Wirinq $ 2,726 0 Non-Reimbursable Desian Error
Total -ChanQe Order No. 2 $ 4,841 0
Item 1 -This item provides for the installation of two refrigerant filters with isolation
valves used to protect compressors and heat exchangers from damage in the event of
contamination of the refrigerant, and four flexible expansion joints for protecting the
units from damage due to excessive vibration and temperature change in the piping
systems. These items were omitted from the contract plans and were needed to
provide a trouble free working system.
Item 2 -This item provides for the installation of conduit and wiring for providing power
and control to the existing hot water pump which connect to the new air conditioning
unit. The wiring for the existing hot water pump was not shown on the contract plans
but was needed to provide an operating system.
Job Completion
The contract is now 100% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the PDC Committee on July 1, 2004. Please refer to the
attached Change Order Status Report for information on all previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price
Previously Authorized Change Order
This Change Order (Add)
Change Orders to Date
Percent Increase to Date
Amended Contract Price
$192,000
$ 19,708
$ 4,841
$ 24,549
12.79%
$216,549
The Budget Information Table is populated by only those Phase costs deemed
necessary for a small project at its inception. Current practice is to have only Design
and Construction Phase costs plus Contingency for Facilities Engineering projects due
to their size and short duration. Small projects with longevity in the system, such as this
one, may have listed budget values in other Phases at inception and are therefore
carried through for continuity.
Page 2
' •
BUDGET IMPACT
~ This item has been budgeted. (Line item: Facilities Engineering, Section 8) D This item has been budgeted, but there are insufficient funds. D This item has not been budgeted. D Not applicable (information item)
ADDITIONAL INFORMATION
None
ALTERNATIVES
None
CEQA FINDINGS
Exempt
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order No. 2
JH:ba:dm:kf
H:\dept\agenda\PDC\2005\Agenda Reports\0905\05-88 -FE02-62 -0901 OS.doc
Page 3
ORIGINAL-
PROJECT/PHASE AUTHORIZED
BUDGET
'
Phase 1 -Project Development $ -$
Phase 2 -Preliminarv Desian $ -$
Phase 3 -Design $ 64,700 $
Phase 4 -Construction $ 149,500 $
Phase 5 -Commissioning $ -$
Phase 6 -Close-Out $ -$
Phase 7 -Continaencv $ 40,000 $
PROJECT TOTAL $ 254,200 $
!Reimbursable Costs
PROJECT NET $ 254,200 $
Design PSA $ 45,000 $
Construction Contract $ 140,000 $
EDMS 003793868
BUDGET INFORMATION TABLE
HVAC Replacement for Operations Center at Plant 2
JOB NO. FE02-62
.•CURRENT PROPOSED PROPOSED .;FUNDS .. ttt1s•· .... , B.UDGET PROJECT 'i.t{~REASE · , Rl:Viseo ,. AUTHORIZJ;D .TO AUrHoRl~TloN·.
BUDGET BUDGET DATE;· REQUEST /DECREASE
'
1,800 $ 1,800 $ 1,800
-$ -$ -
63,500 $ 63,500 $ 62,534
240,400 $ 240,400 $ 219,108 $ 4,841
-$ -$ -
-$ -$ -
35,000 $ 35,000 $ -
340,700 $ -$ 340,700 $ 283,442 $ 4,841
ESTIMATED·. PROPOSED.TOTAL
AUTHORfZATION . EXPENDITURE
TO DATE .·
$ 1,800 $ 1,800
$ -
$ 62,534 $ 53,500
$ 223,949 $ 190,000
$ -$ -
$ -$ -
$ -$ -
$ 288,283 $ 245,300
-$ 340,700 $ 283,442 $ 4,841 $ 288,283 $ 245,300
PSA/Contract
50,000 $ -$ 50,000 $ 49,034 $ -$ 49,034 $ 46,500
235,000 $ 235,000 $ 211,708 $ 4,841 $ 216,549 $ 160,026
. ESTIMA 1J=D
EXPENDED .ro
I·. : OATE(o/o). :
100%
86%
85%
0%
85%
85%
95%
74%
ITEM
CONTRACT
CO N0.1
CON0.2
EDMS 003793869
CHANGE ORDER STATUS REPORT
HVAC REPLACEMENT FOR OPERATIONS CENTER AT PLANT NO. 2
JOB NO. FE02-62
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED
DATE COST TO DATE INCREASE TIME
(DAYS)
7/1/2004 $192,000 $192,000 N/A 180
5/5/2005 $19,708 $211,708 10.26% 0
PENDING $4,841 $216,549 12.79% 0
AUTHORIZED TIME
TO DATE
(DAYS)
180
180
180
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 1of3
Contractor: Bon Air. Incorporated C.O. No.: Two (2)
Date: September 28. 2005
Job: HVAC Replacement for Control Center at Plant No. 2. Job No. FE02-62
Consultant: HOR Inc.
Amount of this Change Order (Add)(Dod1:1ot) $4.841.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 -MECHANICAL MODIFICATIONS
The Contractor shall provide all material, equipment, and labor required to install two new 7/8-inch
refrigerant filters, four new vibration isolators (two 7/8-inch and two 1-1/8-inch), and two new 7/8-inch
isolation valves to service filters. The work was negotiated with the Contractor in accordance with
Division 01, Section 44 (B) (1) of the General Requirements. Reference FCO No. 5 and Bon Air's
letter dated April 12, 2005.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 2 -HOT WATER PUMP WIRING
$2, 115.00
0 Calendar Days
The Contractor shall provide all material, equipment, and labor required to integrate the existing hot
water circulating pump into the new HVAC system. The Contractor shall install 40 feet of %-inch GRC
conduit and three No. 10 wire with ground from the hot water pump to the new HVAC controller. The
work was negotiated with the Contractor in accordance with Division 01, Section 44 (B) (1) of the
General Requirements. Reference FCO No. 4 and Bon Air's letter dated April 12, 2005.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
TOTAL ADDED COSTS THIS CHANGE ORDER:
TOTAL TIME EXTENSION THIS CHANGE ORDER:
$2,726.00
0 Calendar Days
$4,841.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Bon Air. Incorporated C.O. No.: Two (2)
Page 2of3
Date: September 28. 2005
Job: HVAC Replacement for Control Center at Plant No. 2. Job No. FE02-62
Consultant: HDR Inc.
The additional work contained within this change order can be performed incidental to the prime work
and within the time allotted for the original contract and any extensions to the contract time made by
and all previously issued change orders. It is therefore mutually agreed that no extension of time to
perform the work is required for this change order, and no direct or indirect, incidental or
consequential costs, expenses, losses or damages have been or will be incurred by Contractor,
except as expressly granted and approved by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.O.:
Total Contract Time Extension:
Time Subject to Liquidated Damages:
Actual Final Completion Date
January 12, 2005
180 Calendar Days
July 10, 2005
0 Calendar Days
0 Calendar Days
N/A
July 10, 2005
Original Contract Price
Prev. Authorized Changes
This Change (Add)
Amended Contract Price
$192,000
$ 19,708
$ 4,841
$216,549
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Bon Air. Incorporated C.0. No.: Two (2)
Page 3of3
Date: September 28. 2005
Job: HVAC Replacement for Control Center at Plant No. 2. Job No. FE02-62
Consultant: HOR Inc.
Board Authorization Date: September 28, 2005
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Tod Haynes, P.E.
Engineering & Construction Manager
Approved by:
David A. Ludwin P.E.
Director of Engineering
Accepted by:
BON AIR, INCORPORATED
Contractor
EDMS: 003793512
Date
Date
Date
-
PDC COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Dean Fisher, CIP Project Manager
Meeting Date
09/01/05
Item Number
PDC05-90
SUBJECT: PRIMARY CLARIFIERS 16-31 AND RELATED FAC ILITIES,
JOB NO. P1-37
GENERAL MANAGER'S RECOMMENDATION
To Bd. of Dir.
09/28/05
Item Number
13(c)
Ratify Change Order No. 22 to Primary Clarifiers 16-31 and Related Facilities, Job
No. P1 -37, with Margate Construction, authorizing an addition of $48,078, increasing
the total contract amount to $71,756,818.
SUMMARY
Background
• Job Number P1-37, Primary Clarifiers 16-31 and Related Facilities, includes the
construction of 16 new primary clarifiers with all support equipment, improvements to
existing Primary Clarifiers 6-15, and improvements to Primary Clarifiers 1-5.
• Brown and Caldwell prepared the plans and specifications and the contract was
awarded to Margate Construction on October 24, 2001.
• This change order includes 12 items of additional work. There are five
non-reimbursable design errors and no reimbursable design errors associated with
this change order. Liquidated damages on this project are $3,000 per day and there
are no bonus provisions.
Contract Schedule
Contract Start Date
Original Contract Completion Date
Total Number of Change Orders to Date
Current Contract Completion Date
Actual Completion Date
Days Subject to Liquidated Damages
January 7, 2002
November 7, 2005
22
September 26, 2006
N/A
0
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 13(c).P1-37 .doc
1
Change Order Content
Item Description Amount Days Type
No.
Repair Existing Clarifier Expansion Unknown
1 Joints 1,906 0 Conditions
Additional Bollards at Control Non-Reimbursable
2 Buildinq 6-15 2,226 0 Desiqn Error
Slide Gates Cover Plate Modification Non-Reimbursable
3 and Limit Switch Adjustment 1,060 0 Design Error
Thickened Sludge Sample Outlet Non-Reimbursable
4 Pipinq 9,537 0 Desiqn Error
Fall Protection for Clarifier Hatch Staff Requested
5 Openinqs 8,773 0 Design Chanqe
Relocate Eight Scum Pump Staff Requested
6 Discharqe Knife Gate Valves 6,485 0 Desiqn Chanqe
Clarifiers 6-15 Scum Trough
7 Modifications (Value Enqineerina) (31 ,588) 0 Other
Existing Clarifier Top Deck Foul Air Non-Reimbursable
8 Duct Penetration Reinforcement 7,253 0 Desiqn Error
Sludge Density Meter Remote Staff Requested
9 Read-Out 8,411 0 Design Chanqe
Staff Requested
10 Elevating Phase 2 Conduits 8,626 0 Desiqn Chanqe
Uninterruptible Power Supply for Non-Reimbursable
11 Trident Gate Actuators 4,180 0 Desiqn Error
Staff Requested
12 Sunshields for Exposed Instruments 21 ,209 0 Desiqn Chanqe
Total Chanqe Order $48,078 0
Item 1 provides for replacing the sealant and top backer rod of the existing four
north/south top deck expansion joints where the joints cross over the existing scum
gallery. The existing sealant material has separated in the joint causing rain water to
penetrate through the joint and into the operating scum gallery below.
Item 2 adds four new bollards in the area of the westside Control Building 6-15. These
bollards are required to protect the structure and equipment from vehicular traffic.
Item 3 provides for modification of the aluminum checker plate covers surrounding the
stems of six cut throat flume slide gates and for readjustment of the gate limit switches.
The current cover plate and limit switch configuration does not allow for the cut throat
flumes to pass peak flow without obstruction from the slide gates.
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 13(c).P1-37.doc
2
•• ,.
>
Item 4 provides for labor and materials required to extend the thickened sludge sample
piping at 16 locations. This change extends the sample connection outlet to 10-inches
above floor level near the gallery and provides Operations with the means to backflush
the piping.
Item 5 adds fall protection in 32 aluminum cover hatch openings. Orange County
Sanitation District (OCSD) Operations and Safety Departments require these hatches to
have fall protection to prevent personnel from falling into an operating clarifier while
taking manual sludge blanket samples. These modifications were not included in the
contract documents.
Item 6 provides compensation to relocate eight knife gate valves on the discharge side
of eight Phase 1 scum pumps as requested by the OCSD Operations Department. This
change allows for all of the piping to be cleaned during steaming operations. In
addition, if the bypass check valve fails, the pump will be exposed to the high steam
temperatures which in turn could damage the pump.
Item 7 provides for modification of the existing scum troughs in lieu of new cast in place
scum troughs as provided for in the contract. Because the proposal was initiated by the
Contractor, this change qualifies as a value engineering change. The cost savings were
equally divided between the Contractor and OCSD as allowed for in contract Change
Order No. 1, Item 1, "Value Engineering".
Item 8 provides additional structural reinforcement for two 32-inch top deck foul air duct
penetrations in the existing clarifier deck. The penetrations removed a relatively large
piece of concrete and rebar from the existing top deck. The additional structural
reinforcement and steel plates were not shown on the original contract drawings, but
were needed to ensure a structurally sound structure.
Item 9 provides for the procurement and installation of remote meter readouts for two
combined sludge density meters, as requested by the OCSD Operations and
Maintenance Department. In addition, the Contractor will procure and install a Hart
interface for each meter and provide Toshiba software to allow for remote calibration of
the meters. These additions were required due to the meters being located in pipe
racks 20-feet above the gallery floor.
Item 10 provides for additional unistrut supports required to raise Phase 2 conduits to
an elevation of 7-feet off the existing clarifier top deck to avoid tripping hazard.
Item 11 adds Uninterruptible Power Supply (UPS) for two launder level control valve
Trident gate actuators to assure correct remote gate position indication.
Item 12 provides for the fabrication and installation of 76 sunshields over exposed
instrumentation digital readout meters. OCSD Operations Department discovered the
digital meters cannot be read during those hours when the sun glares directly on them.
Also, there is a potential that the sun will deteriorate the LCD readout over a very short
time period.
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 13(c).P1-37.doc
3
Job Completion
The project is 88.25 % complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on October 24, 2001. Please refer
to the attached Change Order Status Report for more information on previous change
orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price
Previously Authorized Changes
This Change
Change Orders to Date
Percentage Increase to Date
Amended Contract Price
BUDGET IMPACT
$ 70,366,000
$ 1,342,740
$ 48,078
$ 1,390,818
1.97%
$ 71,756,818
[gl This item has been budgeted. (Line item: Section a, CIP, P1-37, Page 52) D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted. D Not applicable (information item)
ADDITIONAL INFORMATION
None.
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
This project was included in the Strategic Plan EIR that was certified on October 27,
1999. A Notice of Determination was filed on October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
DF:ms
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 13(c).P1-37.doc
4
.i''
ORIGINAL
PR0"1ECT/PHASE AUTHORIZED
BUDGET
Phase 1 -Project Development
Phase 2 -Preliminary Design
Phase 3 • Desi11n
Phase 4 -Construction
Phase 5 • Commissionin!l
Phase 6 • Closeout
Phase 7 -Contingency
PROJECT TOTAL $ .
I Reimbursable Costs
PROJECT NET $
Desi n PSA
Construction Contract
EDMS/003793458
···--
BUDGET INFORMATION TABLE
Primary Clarifiers No. 16-31 and Related Facilities
Job No. P1-37
'~ > : ' '' .::";:?': '' :: " ' . ~: :
: .. ' :·
:". :
.CURRENT PROPOSED PROPOSED FUNDS THl.S.
PROJECT BUDGET REVISED . AUTHORIZED AUTHORIZATION
BUDGET INCREASE BUDGET TO DATE REQ4EST:. ·•
$ 173,000 $ 173,000 $ 173,000
$ 317,000 $ 317,000 $ 317,000
+•n
$ 4,595,000 $ 4,595,000 $ 4,595,000 ... , ;.; ..
$ 81,642,000 $ 81,642,000 $ 81,448, 182 $ 48,078
,)::, )~~[_;;:: $ 396,000 $ 396,000 $ 396,000
$ 61,000 $ 61,000 $ 61,000 ,. ,
. [)ifr~::: . ·.:_;~f1;;:1'.:} . $ 2,576,000 $ 2,576,000
$ 89,760,000 $ . $ 89,760,000 $ 86,990,182 $ 48,078
I 11 I>' .. ,
'. ~":~~ .. ·.~. ~:
89,760,000 $ -$ 89,760,000 $ 86,990,182 :•::;,tdb!4a,018
PSA/Contract
$ 6,198,861 $ 6,198,861 $ 6,198,861
. , ~ ,_, '
$ 71,708,740 $· .<48;078 $ 71,756,818 $ 71,708,740 $ .i :'48;078
PROPOSED
: .... TOTAL ..
AUTHOFllZATION
$ 173,000
$ 317,000
$ 4,595,000
$ 81,496,260
$ 396,000
$ 61,000
$ .
$ 87,038,260
I
$ 87,038,260
$ 6,198,861
$ 71,756,818
ESTIMATED ESTIMATED
EXPENDITURE TO • EXPENDED
: ·.oATE ');;:,:; :fo DATE(~)
$ 173,000 100%
$ 315,552 100%
$ 4,566,000 99%
$ 68,255,000 84%
$ 32,000 8%
$ 73,341,552 84%
$ 73,341,552 84%
$ 5,510,000 89%
$ 61,470,000 86%
APPROVAL ITEM DATE
CONTRACT 6/23/1999 $
CO NO. 1 12119/2001 $
*CO NO. 2 8/1/2002 $
**CO NO. 3 10/21/2002 $
CO N0.4 12118/2002 $
CO NO. 5 2126/2003 $
CO NO. 6 4/23/2003 $
CO NO. 7 6/25/2003 $
CO NO. 8 8/27/2003 $
CO NO. 9 10/2212003 $
CO NO. 10 11/19/2003 $
CO NO. 11 1214/2003 $
CO NO. 12 2125/2004 $
CO NO. 13 3/24/2004 $
CO NO. 14 5/26/2004 $
CO N0.15 10/27/2004 $
CO NO. 16 12115/2004 $
CO NO. 17 2123/2005 $
CO N0.18 3/23/2005 $
CO N0.19 4/27/2005 $
CO NO. 20 5/25/2005 $
CO NO. 21 7/20/2005 $
CO No~22 .Peridina $
CHANGE ORDER STATUS REPORT
PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES
JOB NO. P1-37
CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED
COST TO DATE INCREASE TIME
(DAYS)
70,366,000.00 $ 70 ,366, 000. 00 0.00 1400
0.00 $ 70,366,000.00 0.00 0
75,214.00 $ 70,441,214.00 0.11 49
48,736.00 $ 70,489,950.00 0.18 0
356,059.00 $ 70,846,009.00 0.68 82
33,527.00 $ 70,879,536.00 0.73 0
54,992.00 $ 70,934,528.00 0.81 21
14,750.00 $ 70,949,278.00 0.83 0
5,363.00 $ 70,954,641.00 0.84 0
187,452.00 $ 71, 142,093.00 1.10 0
56,041.00 $ 71, 198, 134.00 1.18 0
20,680.00 $ 71,218,814.00 1.21 0
22,390.00 $ 71,241,204.00 1.24 0
784.00 $ 71,241,988.00 1.24 0
67,455.00 $ 71,309,443.00 1.34 0
67,937.00 $ 71,377,380.00 1.44 143
(160, 121.00) $ 71,217,259.00 1.21 0
127,478.00 $ 71,344, 737.00 1.39 0
61,690.00 $ 71,406,427.00 1.48 0
116.710.00 $ 71.523.137.00 1.64 0
84.955.00 $ 71.608.092.00 1.77 28
100,648.00 $ 71,708,740.00 1.90 0
.. ···" '48.078.00 ,$ 71.756.818.00 '. .>,.';' '1.97 ·" ' 0
** Approved by PDC Committee per delegated authority by Board Resolution 99-23
* Approved by General Manager per delagated authority by Board Resolution 99-23
EDMS/003793456
-··
AUTHORIZED TIME
TO DATE (DAYS)
1400
1400
1449
1449
1531
1531
1552
1552
1552
1552
1552
1552
1552
1552
1552
1695
1695
1695
1695
1695
1723
1723
1723 ...
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 1 of 8
Contractor: Maraate Construction. Inc. C.O. No.: Twenty Two (22)
Date: September 28. 2005
Job: Primarv Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
Amount of this Change Order (Add)(Dedt:Jet) $48.078.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 -REPAIR EXISTING CLARIFIER EXPANSION JOINTS
This item provides for replacing the sealant and top backer rod of the existing four existing clarifier
north/south top deck expansion joints where the joints cross over the existing scum gallery. The
existing expansion joints have been in place for 15 years. The sealant material has separated in the
joint causing rain water to penetrate through the joint and into the operating scum gallery below.
Installing new sealant and backer rod in the joint provides a water tight seal. The work was
accomplished on Contractor's force account pursuant to Section 48 (B) 2 of the General Requirements
(Reference FCO-P137-253).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 2-ADDITIONAL BOLLARDS AT CONTROL BUILDING 6-15
$1,906.00
0 Calendar Days
This item adds four new bollards in the area of the westside Control Building 6-15. In addition to the
four new bollards, the Contractor will relocate four bollards not yet installed. This change only
provides compensation for the four new bollards. These bollards are required to protect the structure
and equipment from vehicular traffic. The P1 -37 design drawings do not show any bollards at the
entrance to the Control Building 6-15, the westside scum gallery ventilation fan, and the air blower
intake hoods. This change mirrors the bollard placement at the eastside Control Building 16-31 which
was shown on the drawings. The work was accomplished on Contractor's force account pursuant to
Section 48 (B) 2 of the General Requirements (Reference FCO-P137-256).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$2,226.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 2 of 8
Contractor: Margate Construction. Inc. C.O. No.: Twenty Two (22)
Date: September 28. 2005
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 3-SLIDE GATES COVER PLATE MODIFICATION AND LIMIT SWITCH ADJUSTMENT
This item provides for modification of the aluminum checker plate covers surrounding the stems of six
cut throat flume slide gates and for readjustment of the gate limit switches. The hole in the cover
plates will be enlarged to allow the gate stem coupling to pass through, but not the gate itself. The
valve limit switches will be adjusted to indicate the gate is fully open when the top of the gate is 1-inch
from the bottom of the cover. The current cover plate and limit switch configuration does not allow for
the cut throat flumes to pass peak flow without obstruction from the slide gates. The work was
accomplished on Contractor's force account pursuant to Section 48 (8) 2 of the General Requirements
(Reference FCO-P137-257).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 4 -THICKENED SLUDGE SAMPLE OUTLET PIPING
$1,060.00
0 Calendar Days
This item provides for labor and materials required to extend the thickened sludge sample piping at 16
locations. The thickened sludge sample outlets at each thickened sludge pump are located 3-feet
above the main gallery floor slab and directly over a pressure gauge. This change extends the sample
connection outlet to 1 0-inches above floor level and provides Operations with means to backflush the
piping. The work was accomplished on Contractor's force account pursuant to Section 48 (B) 2 of the
General Requirements (Reference FCO-P137-258).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 5-FALL PROTECTION FOR CLARIFIER HATCH OPENINGS
$9,537.00
O Calendar Days
This item adds fall protection in 32 Primary Clarifier aluminum cover hatch openings as requested by
the Orange County Sanitation District (OCSD) Operations and Safety Departments. The clarifier cover
hatch openings are used by Operations to perform daily manual check of the depth of the sludge
blanket and a visual inspection of the sludge collectors. The fall protection consists of two stainless
steel chains attached diagonally across the hatch opening to prevent personnel from falling into the
clarifier. Only the hatches from which samples are taken require the fall protection. The work was
accomplished on Contractor's force account pursuant to Section 48 (8) 2 of the General Requirements
(Reference FCO-P137-259).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$8,773.00
0 Calendar Days
.-
\.
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 3 of 8
Contractor: Maraate Construction. Inc. C.O. No.: Twenty Two (22)
Date: September 28. 2005
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 6-RELOCATE EIGHT SCUM PUMP DISCHARGE KNIFE GATE VALVES
This item provides compensation to relocate eight knife gate valves on the discharge side of eight
Phase 1 scum pumps as requested by the OCSD Operations Department. The valves are relocated
as close as possible to the discharge of the pump to allow for all of the piping to be cleaned during
steam out. In addition, if the bypass check valve fails during steam cleaning operations, the pump
would be exposed to the high steam temperatures which could damage the pump. This work involves
modifications of two short 6-inch pipe spools at each of the eight Phase 1 scum pumps. This same
configuration change will be made to the four Phase 2 scum pump discharge knife gate valves.
Modifications to Phase 2 pump piping work is not considered an extra because the piping has not yet
been fabricated. The work was accomplished on Contractor's force account pursuant to Section 48
(8) 2 of the General Requirements (Reference FCO-P137-271 ).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 7-CLARIFIERS 6-15 SCUM TROUGH MODIFICATIONS
$6,485.00
0 Calendar Days
This item provides for a better and less costly modification of the existing Clarifiers 6-15 scum troughs
in lieu of new cast in place scum troughs. The original contract design required the Contractor to
completely demolish the existing scum troughs. This change utilizes a portion of the existing scum
troughs and thus reduces the amount of demolition required. As a result, the Contractor used less
labor, less concrete, less reinforcing steel, and less PVC liner. The proposal initiated by the
Contractor was reviewed and accepted by the OCSD design consultant and OCSD staff. This change
order was submitted and accepted as a value engineering proposal in accordance with the conditions
agreed to in Change Order No. 1, Item 1, of this contract. The work associated with this Change
Order item was negotiated with the Contractor pursuant to Section 48 (B) 1 of the General
Requirements (Reference FCO-P137-278).
CREDIT THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
($31,588.00)
O Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 4 of 8
Contractor: Margate Construction. Inc. C.0. No.: Twenty Two (22)
Date: September 28. 2005
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 8-EXISTING CLARIFIER TOP DECK FOUL AIR DUCT PENETRATION REINFORCEMENT
This item provides additional structural reinforcement for two 32-inch foul air duct penetrations passing
through the existing clarifier scum gallery top concrete deck as recommended by the OCSD design
engineer. The additional structural reinforcement, steel plates, are used to anchor the concrete
reinforcing steel which must be cut for the foul air duct penetration. These additional structural steel
plates were not shown on the original contract drawings. The work associated with this Change Order
item was negotiated with the Contractor pursuant to Section 48 (B) 1 of the General Requirements
(Reference FCO-P137-280).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 9 -SLUDGE DENSITY METER REMOTE READ-OUT
$7,253.00
0 Calendar Days
This item provides for the procurement and installation of remote meter readouts for two combined
sludge density meters as requested by the OCSD Operations Department. In addition, the Contractor
will procure and install a HART modem for each meter and will procure for turnover to OCSD one set
of Toshiba proprietary software for use in remote configuration of the instruments via use of a laptop
computer. The combined thickened sludge density transmitters are installed in an elevated pipe rack
in the existing clarifier east scum gallery. The transmitter displays attached to each of the meters are
too high above floor level, approximately 20 feet, for the operators to be able to read them. This
change will provide remote readout at gallery floor elevation and also provide a means to calibrate the
instruments without having to climb up to them. The work associated with this Change Order item was
negotiated with the Contractor pursuant to Section 48 (B) 1 of the General Requirements (Reference
FCO-P137-281 ).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$8,411.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 5 of 8
Contractor: Margate Construction. Inc. C.O. No.: Twenty Two (22)
Date: September 28. 2005
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 10-ELEVATING PHASE 2 CONDUITS
This item provides for additional unistrut supports required to raise Phase 2 conduits to an elevation of
7-feet off the existing clarifier top deck. The Phase 2 electrical work requires the Contractor to install
conduits on top of an existing concrete deck which would result in a tripping hazard for the OCSD
Operations and Maintenance personnel. It would be impractical to install the conduits in the deck
which would require saw cutting and grouting. This would also result in damage to the reinforcing
steel and compromise to the structural integrity of the structure. The OCSD staff proposed raising the
conduits to avoid the tripping hazard. The work associated with this Change Order item was
negotiated with the Contractor pursuant to Section 48 (B) 1 of the General Requirements (Reference
FCO-P137-283).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$8,626.00
0 Calendar Days
ITEM 11 -UNINTERRUPTIBLE POWER SUPPLY FOR TRIDENT GATE ACTUATORS
This item adds Uninterruptible Power Supply (UPS) for two launder level control valve Trident gate
actuators. The Trident gate actuators used for the two effluent channel level control gates lose correct
remote indication when they lose power. The Control Center monitors show the gate CLOSED during
power outages when the gate might be either OPENED or CLOSED. This change resolves this
problem by transferring the essential control elements to the UPS to assure correct remote gate
position indication. The work associated with this Change Order item was negotiated with the
Contractor pursuant to Section 48 (B) 1 of the General Requirements (Reference FCO-P137-285).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$4,180.00
O Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 6 of 8
Contractor: Margate Construction. Inc. C.0. No.: Twenty Two (22)
Date: September 28. 2005
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 12 -SUNSHIELDS FOR EXPOSED INSTRUMENTS
This item provides for the fabrication and installation of 76 sunshields over exposed instrumentation
digital readout meters. The sunshades are fabricated from 316 stainless steel sheet material and
attached to the existing instrument stanchions by use of stainless steel nuts and bolts. The OCSD
Operations Department discovered the digital meters cannot be read during those hours when the sun
glares directly on them and even more important there is a potential that the sun will deteriorate the
LCD readout over a very short time period. This change will provide for fabrication and installation of
sunshields over those digital meters. The added cost associated with this Change Order item was
negotiated with the Contractor pursuant to Section
48 (8) 1 of the General Requirements (Reference FCO-P137-287).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
TOTAL ADDED COST THIS CHANGE ORDER:
TOTAL TIME EXTENSION THIS CHANGE ORDER:
$21,209.00
0 Calendar Days
$48,078.00
O Calendar Days
;
Page 7 of 8
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Maraate Construction. Inc. C.O. No.: Twenty Two (22)
Date: September 28. 2005
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
The additional work contained in this Change Order can be performed incidental to the prime work and
within the time allotted for the original Contract and any extensions to the Contract time made by this and
all previously issued Change Orders. OCSD and Contractor agree that the added cost described above
constitutes full and equitable consideration for all the impacts incurred by the Contractor, and no other
direct or indirect, incidental or consequential costs, expenses, losses or damages have been or will be
incurred by Contractor, except as expressly granted and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.O:
Total Contract Time Extension:
Revised Contract Time:
Revised Final Completion Due Date:
Time Subject to Liquidated Damages:
Actual Final Completion Date:
January 7, 2002
1,400 Days
November 7 ,2005
0 Days
323 Days
1,723 Days
September 26, 2006
N/A
NIA
Original Contract Price
Prev. Authorized Changes
This Change (Add) (Deeft:Jot)
Amended Contract Price
$ 70.366.000.00
$ 1.342.740.00
$ 48.078.00
$ 71.756.818.00
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 8 of 8
Contractor: Maraate Construction. Inc. C.O. No.: Twenty Two {22)
Date: September 28. 2005
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
Board Authorization Date: September 28, 2005
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Dean Fisher, P. E.
GIP Project Manager
Approved by:
David A. Ludwin, P. E.
Director of Engineering
Accepted by:
MARGATE CONSTRUCTION
Contractor
EDMS/003793457
Date
Date
Date
\
-· •
PDC COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: David A. Ludwin, Director of Engineering
Originator: Hardat Khublall, CIP Project Manager
Meeting Date To Bd. of Dir.
09/01/05 09/28/05
Item Number Item Number
PDC05-91 13(d)
SUBJECT: GISLER-REDHILL TRUNK IMPROVEMENTS, REACH "A", CONTRACT
NO. 7-36; ORANGE TRUNK IMPROVEMENTS, CONTRACT NO. 7-39;
GISLER-REDHILUNORTH TRUNK IMPROVEMENTS, CONTRACT
NO. 7-41 ; AND CITY OF TUSTIN PROJECT NOS. 6106 AND 6151
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 5 to Gisler-Redhill Trunk Improvements, Reach "A", Contract
No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk
Improvements, Contract No. 7-41 ; and City of Tustin Project Nos. 6106 and 6151, with
ARB, Inc., authorizing an addition of $209,252 and 21 calendar days, increasing the
total contract amount to $20, 169,324.
SUMMARY
Background
• Contract No. 7-41 , located in the City of Tustin, City of Orange, and unincorporated
areas of the County of Orange, consists of improvements to rel ieve hydraulic
deficiencies on the Gisler-Redhill North Trunk Sewer along Newport Avenue, El
Camino Real, and Prospect Avenue. Contract No. 7-39 is located in the City of
Tustin and in the unincorporated areas of the County of Orange, and consists of
improvements to relieve hydraulic deficiencies on the Orange Trunk Sewer along
Holt Avenue, 1 ?'h Street, and Hewes Avenue. Contract No. 7-36, located in the City
of Tustin, consists of improvements to relieve hydraulic deficiencies on the Gisler-
Redhill Trunk Sewer Improvements along Redhill Avenue from Mitchell Avenue to La
Colina Drive. The 1999 Strategic Plan identified these reaches of sewers as
hydraulically deficient and in need of replacement.
• AKM Consulting Engineers prepared the plans and specifications and the
construction contract was awarded to ARB, Inc. on January 28, 2004.
• Change Order No. 5 includes eight items of additional work to Contract No. 7-36 and
Contract No. 7-41 . There are no reimbursable or non-reimbursable design errors
associated with this change order. The contract includes liquidated damages of
$1,000 per day and no bonus provisions.
Page 1
Contract Schedule
Contract Start Date
Original Contract Completion Date
Total Number of Change Orders to Date
Current Contract Completion Date
Revised Completion Date
Days Subject to Liquidated Damages
Liquidated Damages Assessment
Change Order No. 5 Content
Item No. Description
Contract
No. 7-36
1 Undisclosed Water Valve Thrust
Blocks
Contract
No. 7-41
2 12-lnch Waterline Connection
for Citv of Tustin Contract 6151
3 Additional Asphalt from Sta.
114+00 to Sta. 119+50
4 Waterline Replacement and
Sinkhole Reoair
5 Protection of 2-inch and 4-lnch
Gas Line
6 Undisclosed 24-inch Storm
Drain
7 Undisclosed 6-inch Old Road
Concrete Pavement
8 Contract Time Extension from
Station 80+48 to Station 107 +50
Total -ChanQe Order No. 5
April 5, 2004
November 25, 2005
5
January 28, 2006
February 18, 2006
0
N/A
Amount Days
$ 6,373 0
$ 13,210 0
$ 41 ,000 0
$ 51 ,961 0
$ 6,435 0
$ 3,590 0
$ 86,683 0
0 21
$209,252 21
Type
Unknown
Conditions
Unknown
Conditions
Unknown
Conditions
Unknown
Conditions
Unknown
Conditions
Unknown
Conditions
Unknown
Conditions
Other
Item 1 -This item is for additional work due to two undisclosed 8-inch asbestos cement
(AC) waterline thrust blocks. The two 8-inch AC waterlines are shown in contract
drawings, one running parallel and one crossing the proposed sewer trench at
approximate Sewer Station 10+30, but the water valves and their thrust blocks were not
shown on contract drawings. The traffic control and sewer alignment drawings were
modified because the thrust blocks conflicted with the proposed sewer alignment.
Item 2 -This item is to connect the proposed 12-inch waterline to an existing 10-inch
waterline at Fairhaven Avenue and Prospect Avenue intersection. Several utilities
conflicted with the contract required connection and additional work was required to
complete the connection. The additional costs were approved by the City of Tustin and
costs will be reimbursed to the District.
Page2
Item 3 -This item is to remove and replace asphalt pavement that was not disclosed in
contract documents from Sewer Stations 114+00 to 119+50. Field crews continue to
t' encounter existing pavement thicker than indicated on the geotechnical investigation
report and additional costs will be included in a future change order.
Item 4 -This item is for the repair of a sinkhole developed after construction due to a
leaking 8-inch asbestos cement (AC) waterline. The waterline was not shown on the
contract drawings. The item includes pavement removal and replacement, additional
trench excavation, removal of wet-loose backfill material, slurry backfill, waterline repair
and replacement. The existing waterline was very fragile and ruptured several times
during construction.
Item 5 -This item is to remove an abandoned 2-inch gas line from Sewer Stations
114+00 to 116+00 and to protect and support a 4-inch gas line from Sewer Stations
118+60 to 119+00. The proposed sewer alignment was revised from Sewer Stations
113+29 to 124+50 due to an undisclosed fiber optic cable encasement. The revised
alignment located the proposed sewer 8-feet from an abandoned 2-inch gas line and an
existing 4-inch gas line as shown on the contract drawings. During construction the gas
lines were found to be in conflict with the revised sewer alignment.
Item 6 -This item is to support and protect an undisclosed 24-inch storm drain located
at approximate Sewer Station 107 +40. The storm drain was not marked on the contract
drawings.
Item 7 -This item is to remove an undisclosed 6-inch concrete pavement section, found
beneath the existing street asphalt paving. The proposed sewer alignment was revised
from Sewer Stations 95+00 to 107 + 75, due to an undisclosed fiber optic cable
encasement, to a location in close proximity to an undisclosed 6-inch existing concrete
pavement. The concrete pavement interfered with the sewer excavation and was
removed to proceed with the 27-inch sewer installation.
Item 8 -This item is a negotiated contract time extension with the Contractor for all time
delays for the sewer installation and alignment changes between Sewer Stations 80+48
through 107+50, including time extensions required by Field Change Orders No. 31 and
No. 36, and including time extensions required for Contractor's soil moisture content
claim. Staff and Contractor agreed that the critical path was delayed by 21 days
between Sewer Stations 80+48 through 107+50. This is an excusable but non-
compensable time extension to the Contract, since costs have already been
compensated to the Contractor under Items 5 and 6 of previous Change Order No. 4,
approved by the Board on July 20, 2005, which included all direct, indirect, incidental,
consequential, and extended overhead costs for the sewer installation between Sta.
80+48 to 107 +50. However, costs resulting from Contractor's soil moisture content
claim are not included in this resolution and may be negotiated at a later time. Please
see "ADDITIONAL INFORMATION" section for this item.
Page3
Job Completion
The contract is now 65% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The construction contract was awarded by the Board on January 28, 2004 for a lump
sum of $18,375,999. Please see attached Change Order Status Report for information
on all previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price
Previously Authorized Change Order
This Change Order (Add)
Change Orders to Date
Percent Increase to Date
Amended Contract Price
BUDGET IMPACT
$ 18,375,999
$ 1,584,073
$ 209,252
$ 1,793,325
9.76%
$ 20, 169,324
~ This item has been budgeted. (Line item: Contract No. 7-41 FY 05/06, Section 8, Page
38, Contract No. 7-39 FY 05/06, Section 8, Page 36, Contract No. 7-36 FY 05/06, Section 8,
Page 34 Capital Improvement Program, Collections Facilities, Facilities Engineering Projects-
Collections)
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
Background for Item 8:
The Contractor submitted a claim to the District for additional compensation and a
contract time extension resulting from differing site conditions encountered during
construction of the project from Sewer Stations 82+00 to 106+ 10. Contractor's claim
states that actual soil moisture contents were higher than were indicated in the
geotechnical investigation report performed as part of the project design and referenced
under the contract. Staff and Contractor are in the process of negotiating and
analyzing any justifiable costs impacts to the project attributable to Contractor's claim.
However, time impacts have been agreed between District staff and Contractor as
stated under Item 8 of this change order.
Page4
' ...
ALTERNATIVES
: None
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program Environmental
Impact Report certified on October 27, 1999. A Notice of Determination was filed on
October 29, 1999.
ATTACHMENTS
1. Budget Information Tables-C.N. 7-36n-41
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order No. 5
RC:ba
H:\dept\agenda\PDC\2005\Agenda Reports\0905\05-91 -7-36 -090105.doc
Pages
ORIGINAL
PROJECT/PHASE AUTHORIZED
BUDGET
Phase 1 -Project Development $ 45,000 $
Phase 2 -Preliminarv Desian $
Phase 3 -Desian $ 369,000 $
Phase 4 -Construction $ 6,386,000 $
Phase 5-Commissioning $
Phase 6 -Close-Out $
Phase 7 -Continaencv $ 1,032,000 $
PROJECT TOTAL $ 7,832,000 $
!Reimbursable Costs
PROJECT NET $ 7,832,000 $
Design PSA $ 223,176 $
Construction Contract $ 6,386,000 $
EDMS ITEM ID: 003793922
BUDGET INFORMATION TABLE
GISLER-REDHILL TRUNK IMPROVEMENTS, REACH "A"
CONTRACT NO. 7-36, CO #5
CURRENT PROPOSED PROPOSED . FU.NOS. . THIS ... ·•••.
PROJECT BUDGEJ' REVISED AUTHORIZED TO .AlJTHORtzATION INCREASE BUDGET /DECREASE BUDGET DATE REQUEST
29,810 $ 29,810 $ 29,810
1,504 $ 1,504 $ 1,504
581,679 $ 581,679 $ 581,679
5,822,158 $ 6,373 $ 5,828,531 $ 5,822,158 $ 6,373
94,272 $ 94,272 $ 94,272
23,050 $ 23,050 $ 23,050
504,960 $ (6,373l $ 498.587
7,057,433 $ -$ 7,057,433 ... $ 6,552,473 $ 6,373
7,057,433 $ 7,057,433 $ 6,552,473 $
PSA/Contract
307,403 $ 307,403 $ 307,403
5,151,163 $ 6,373 $ 5, 157,536 $ 5,151,163 $ 6,373
... ,
PROPOSED ESTIMATED . ...••. · E:.STIMATED
TOTAL EXPENDITURE EXPENDED to
AUTHORIZATION TO DATE DATE(%)'
.. .·
$ 29,810 $ 29,810 100%
$ 1,504 $ 1,504 100%
$ 581,679 $ 581,679 100%
$ 5,828,531 $ 1,930,311 33%
$ 94,272 $ 14.449 15%
$ 23,050 $ 442 2%
$ 6,558,846 $ 2,558,195 39%
6,558,846 $ 2,558,195 39%
$ 307,403 $ 281,000 91%
$ 5,157,536 $ 1,533,236 30%
CHANGE ORDER STATUS REPORT
GISLER-REDHILL TRUNK SEWER IMPROVEMENTS, ORANGE TRUNK SEWER IMPROVEMENTS, AND
GISLER-REDHILL NORTH TRUNK SEWER
CONTRACT NOS. 7-36, 7-39, AND 7-41
AND CITY OF TUSTIN PROJECT NUMBERS 6106 AND 6151 -CO #5
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(DAYS) (DAYS)
CONTRACT 1/28/2004 $18,375,999 $18,375,999 0.00% 600 600
CO NO. 1 11/24/2004 $349,612 $18,725,611 1.90% 20 620
CON0.2 2/23/2005 $169,223 $18,894,834 2.82% 15 635
CO NO. 3 4/27/2005 $571,975 $19,466,809. 5.94% 20 655
CO N0.4 7/20/2005 $493,263 $19,960,072 8.62% 9 664
CO N0.5 Pending $209,252 $20, 169,324 9.76% 21 685
EDMS:003793921
'l
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 1of7
Contractor: ARB. INC. C.O. No.: Five (5)
Date: September 28. 2005
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36; Orange
Trunk Improvements. Contract No. 7-39: Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Project Numbers 6106. and 6151
Consultant: AKM Consulting Engineers
Amount of this Change Order (Add) $209.252.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
Contract No. 7-36
ITEM 1 -UNDISCLOSED WATER VALVE THRUST BLOCKS
This item is for additional labor, material and equipment associated with two undisclosed water valve
thrust blocks. Two 8-inch asbestos cement (AC) waterlines are shown in contract drawings, one
running parallel and one crossing the proposed sewer trench at approximate Sewer Station 10+30.
The water valves and thrust blocks were not shown on contract drawings. The traffic control and
sewer alignment drawings were modified because the thrust blocks conflicted with the proposed
sewer alignment. The extra work consisted of additional exploratory excavations for utility locating
and additional traffic control due to the revised alignment. This work is in progress and additional
costs for this item will be included in a future change order. This item was accomplished by
Contractor's Force Account in accordance with Division 1, Section 44(8)2 of the General
Requirements (Reference FCO 38).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$ 6,373.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 2of7
Contractor: ARB. INC. C.0. No.: Five (5)
Date: September 28. 2005
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36: Orange
Trunk Improvements. Contract No. 7-39: Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Project Numbers 6106. and 6151
Consultant: AKM Consulting Engineers
Contract No. 7-41
ITEM 2-12-INCH WATERLINE CONNECTION FOR CITY OF TUSTIN CONTRACT 6151
This item compensates the Contractor for the additional labor, material and equipment required to
connect the proposed 12-inch water line to an existing 10-inch waterline at Fairhaven Avenue and
Prospect Avenue intersection. Several utilities conflicted with the required 10-inch hot tap connection
on the existing 10-inch water main. The conflicting utilities are a 16-inch PVC waterline, a 6-inch gas
line, a 20-inch steel line and a 3-inch Edison line. The extra work consisted of additional exploratory
excavations, additional trench excavation and backfill, installation of an additional 12-inch tee and a
90-degree elbow. This item was approved by the City of Tustin and costs will be reimbursed to the
District. This item was accomplished by Contractor's Force Account in accordance with Division 1,
Section 44(B)2 of the General Requirements (Reference FCO 39).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 3 -ADDITIONAL ASPHALT FROM STA. 114+00 TO STA. 119+50
$ 13,210.00
0 Calendar Days
This is an ongoing item associated with the removal and replacement of undisclosed asphalt from
Sewer Stations 114+00 through 119+50. Borings taken during the geotechnical investigation
performed as part of the project design indicated an asphalt thickness varying from three inches to six
inches. Up to ten inches of asphalt was actually encountered at these locations. In addition, the City
of Tustin requested that the thickness replaced conformed with the City of Tustin's street index
standards for asphalt replacement. Field crews continue to encounter paving thicker than indicated
on the geotechnical investigation report. Those costs will be included in a future change order. This
item was negotiated with the Contractor pursuant to Section 44(B)1 of the General Requirements
(Reference FCO 40, CO No.3 -Item 7, CO No.2 -Item 7).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$ 41,000.00
0 Calendar Days
,
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 3of7
Contractor: ARB. INC. C.O. No.: Five (5)
Date: September 28. 2005
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36: Orange
Trunk Improvements. Contract No. 7-39: Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Project Numbers 6106. and 6151
Consultant: AKM Consulting Engineers
ITEM 4-WATERLINE REPLACEMENT AND SINKHOLE REPAIR
This item compensates the Contractor for the repair of a sinkhole and repair and replacement of an
existing 8-inch asbestos cement (AC) waterline located at approximate Sewer Station 103+47.
Sewer installation and asphalt paving was completed several weeks before the sinkhole developed.
The sinkhole developed due to leakage of the 8-inch AC waterline. The waterline crosses the trench
at this location and was not marked on contract drawings, but disclosed and marked in the field by the
City of Tustin Water Department. The 8-inch AC waterline is very fragile and ruptured several times
during construction. The additional work consisted of pavement removal and replacement, trench
excavation, removal of wet-loose backfill material, slurry backfill, waterline repair and replacement.
This item was negotiated with the Contractor pursuant to Division 1, Section 44(8)2 of the General
Requirements (Reference FCO 42).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 5 -PROTECTION OF 2-INCH AND 4-INCH GAS LINE
$51,961.00
0 Calendar Days
This item is for additional costs to remove an abandoned 2-inch gas line from Sewer Stations 114+00
to 116+00, and to protect and support an existing 4-inch gas line between Sewer Stations 118+60 to
119+00. The proposed sewer alignment was revised from Sewer Stations 113+29 to 124+50 due to
an undisclosed fiber optic cable encasement. The revised alignment located the proposed sewer
8-feet from an abandoned 2-inch gas line and an existing 4-inch gas line as shown on the contract
drawings. During construction the gas lines were found in conflict with the revised sewer alignment.
The additional work consisted on removal of the 2-inch gas line and protection and support of the 4-
inch gas line. This item was negotiated with the Contractor pursuant to Division 1, Section 44(8)2 of
the General Requirements (Reference FCO 46).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$6,435.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 4of7
Contractor: ARB. INC. C.O. No.: Five (5)
Date: September 28. 2005
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36: Orange
Trunk Improvements. Contract No. 7-39: Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Project Numbers 6106. and 6151
Consultant: AKM Consulting Engineers
ITEM 6 -UNDISCLOSED 24-INCH STORM DRAIN
This item compensates the Contractor for the additional costs to protect and support an undisclosed
24-inch storm drain located at approximate Sewer Station 107+40. The 24-inch storm drain was not
shown on contract drawings. The additional work consisted of additional trench excavation, pavement
removal and replacement, and protection of the storm drain. This item was negotiated with the
Contractor pursuant to Division 1, Section 44(8)2 of the General Requirements (Reference FCO 47).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 7-UNDISCLOSED 6-INCH OLD ROAD CONCRETE PAVEMENT
$3,590.00
0 Calendar Days
This item compensates the Contractor for the removal of an undisclosed 6-inch concrete pavement
section from Sewer Stations 95+00 to 102+00. The proposed sewer alignment was revised from
Sewer Stations 95+00 to 107+75 due to an undisclosed fiber optic cable encasement. The revised
alignment located the proposed sewer in close proximity to an undisclosed 6-inch existing concrete
pavement found beneath the street asphalt paving. The concrete pavement interfered with the sewer
excavation and was removed to proceed with the 27-inch sewer installation. The additional work
consisted of additional trench excavation, removal of 700-feet of 6-inch concrete pavement and
additional asphalt removal and replacement. This item was negotiated with the Contractor pursuant
to Division 1, Section 44(8)2 of the General Requirements (Reference FCO 48).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$86,683.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 5of7
Contractor: ARB. INC. C.O. No.: Five (5)
Date: September 28. 2005
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36: Orange
Trunk Improvements. Contract No. 7-39: Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Project Numbers 6106. and 6151
Consultant: AKM Consulting Engineers
ITEM 8-CONTRACT TIME EXTENSION FROM STATION 80+48 TO STATION 107+50
This item is a negotiated contract time extension for all time delays for the sewer installation and
alignment changes between Sewer Stations 80+48 through 107+50, including time extensions
required by Field Change Orders No. 31 and No. 36, and including time extensions required for
Contractor's soil moisture content claim. District staff and Contractor agreed that the critical path was
delayed by 21 days between Sewer Stations 80+48 through 107+50. This is an excusable but non-
compensable time extension to the contract, since costs have already been compensated to the
Contractor under Items 5 and 6 of previous Change Order No. 4, approved by the Board on July 20,
2005, which included all direct, indirect, incidental, consequential and extended overhead costs for
the sewer installation between Sta. 80+48 to 107+50. However, direct costs resulting for Contractor's
soil moisture content claim are not included in this resolution and may be negotiated at a later time.
Pursuant to Section 48 of the General Conditions, an extension of time for completion of 21 calendar
days is granted to the Contractor (Reference FCO 31, FCO 36).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
TOTAL ADDED COSTS THIS CHANGE ORDER:
TOTAL TIME EXTENSION THIS CHANGE ORDER:
$0.00
21 Calendar Days
$209,252.00
21 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 6of7
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that a 21 day extension
of time to perform the work is required for this Change Order, and that no direct or indirect, incidental
or consequential costs, expenses, losses or damages have been or will be incurred by Contractor,
except as expressly granted and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.O.:
Total Contract Time Extension:
Revised Contract Time:
Revised Final Completion Due Date:
Time Subject to Liquidated Damages:
Actual Final Completion Date:
April 5, 2004
600 Calendar Days
November 25, 2005
21 Days
85 Days
685 Calendar Days
February 18, 2006
N/A
N/A
Original Contract Price
Prev. Authorized Changes
This Change (Add)
Amended Contract Price
$18.375.999.00
$ 1.584.073.00
$ 209.252.00
$20.169.324.00
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Board Authorization Date: September 28, 2005.
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Hardat Khublall, P.E.
CIP Project Manager
Approved by:
David Ludwin P.E.
Director of Engineering
Accepted by:
ARB INC.
Contractor
EDMS: 003793918
Date
Date
Page 7of7
CHANGE ORDER NO. 5 September 28, 2005
1-.~
\/ \ _,,
~ 12-inch WL Connection
\ . _,....
-J
Item 2 -12-inch Waterline Connection for
City of Tustin Contract 6151 ---' -~
Item 4 -Waterline Replacement and Sinkhole Repair
I EDMS:003794302 I
Installing Base Paving
Item 3 -Additional Asphalt from Sta . 114+00 to
Sta. 119+50
·.>/ ; , -•I .;}" ~~-__ , .... . ~ ... l '.'.'
J .>.... , . ·-~~~. , •· '.:.!·1,..f
\ ·-'-~, ..• -• 4' ••.. •· • :1 •• : -•
\ti\ •f~I"' I 11 ' -5 I I ' •1 :• .t i>,~~'j·1 ····'.~ ... ·,·., ... _,,r··. ...-·-• . ...,. ...... -.· .. ·• 1>'• ,\',. . jo' .' , • '". ' ;.,_. ,;-, ~ { (. / )I.•' / 'o ~' 1(1 I , ~--., ' • ~ ' ·}""( •• 1'"'\ A'• ... ...:...<;',_J _., .. ,-...~·, , ~;{"-1.t;t ~-t·1~l· · "·' ,·,
, 0 (' • I • · , ... , "J • ·' • • '' '' \ • '" • I , ':<;_,'\.).{~ ) ,·,,,"( ,, f',. ::J .. :J,,"·--.·;,·. ~t •. ,",.. ,.,> ,\:'', '·\' .· ~-....... ~'!.-
" 24-inch Storm Drain Sta. 107+40 '.'~'*
' " <• ~ • ' L ; / • ' , ., , 'I " ' \ .,. .. r.~·1 ~~ ,,~ " ··' . . ~-· ', ~ ·.! #' ,, I 11
Item 6 -Undisclosed 24-inch Storm Drain
PDC COMMITTEE Meeting Date To Bd. of Dir.
9/1/05 9/28/05
AGENDA REPORT Item Number Item Number
PDC05-93 13(e)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Bob Schirripa, Project Manager
SUBJECT: PRIMARY TREATMENT REHABILITATION AND REFURBISHMENT,
JOB NO. P2-80
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the Professional Services Agreement with Malcolm
Pirnie, Inc. for Primary Treatment Rehabilitation and Refurbishment, Job No. P2-80,
providing for additional engineering services for an amount of $829,984, increasing the
total amount not to exceed $6,608,502.
SUMMARY
• In March 2004, the Orange County Sanitation District (OCSD) issued a
Professional Services Agreement (PSA) to Malcolm Pirnie, Inc. (MPI) to provide
engineering services for Primary Treatment Rehabilitation and Refurbishment,
Job No. P2-80. This project upgrades the primary clarifier odor control facilities
in the North and South Scrubber Complexes in Plant No. 2. These upgrades
include the replacement of the cu rrent single stage chemical scrubbers with a
new two stage scrubbing system consisting of a biotower followed by a chemical
scrubber along with the associated supporting facilities such as ductwork, supply
fans , and chemical supply systems. In addition, this project also includes the
rehabilitation and refurbishment of the concrete and steel structures for the
primary clarifiers and the inspection of all of the underground influent and effluent
pipelines to the primary clarifiers.
• Amendment No. 1 adds the following work items to the currently approved PSA:
o Geotechnical Investigation Services: Provide subsurface investigation for
slabs and footing foundations at various several project locations where
new equipment would be located. The requirement for this new equipment
was not known at the time that the design work was awarded. It became
known as a result of the Preliminary Design Report and focus meetings
between staff and the consultant. ($70,800)
o Deletion of Loop Diagrams: It was determined by staff that having the
consultant produce loop diagrams was redundant since the contractor will
need to produce these during construction. (-$45,526)
o North Scrubber Complex Switchgear Replacement: This switchgear
needs to be replaced in order to meet engineering guidelines. ($15,289)
Page 1
o Additional Influent/Effluent Piping Inspection: During the development of
the inspection procedure, it was determined that Plant No. 2 Operations ~
would not be able to provide any support for the bypass pumping and
dewatering necessary for the various shutdowns. This bypass pumping
and dewatering now needs to be done by the inspection subcontractor
and involves seven shutdowns and the bypassing and dewatering of
various pipes and structures in order to provide access for inspection. This
bypass pumping and dewatering represents $452,000 of the $675,000 for
the inspection services. In addition , it was agreed to include some further
inspections and non-destructive testing while the clarifiers and various
pipes were out of service. ($789,421)
PRIOR COMMITTEE/BOARD ACTIONS
The attached PSA Status Report summarizes all Board actions.
PROJECVCONTRACTCOSTSUMMARY
The attached letter from MPI , dated July 18, 2005, summarizes the scope and costs
associated with the proposed Amendment No. 1. Authorization is requested to increase
the value of the PSA by $829,984 which will result in a total PSA not to exceed
$6,608,502.
BUDGET IMPACT
~ This item has been budgeted. (Line item: Section 8 -Page 53)
D This item has been budgeted, but there are insufficient funds. D This item has not been budgeted. D Not applicable (information item)
ADDITIONAL INFORMATION
The work identified in proposed Amendment No 1 has been determined by staff as
necessary for the successful completion and implementation of Job No. P2-80. As
listed, the work identified in the proposed Amendment No. 1 was the result of design
requirements and field investigations by the consultant during the preparation of the
Preliminary Design.
At the PDC Committee meeting held on September 1, 2005, the PDC Committee
directed the Director of Engineering to remove the Amendment No. 1 item, "Existing
Geodesic Dome Cover Inspection" in the amount of $90, 110 from the Amendment.
Following the deletion of this item, the PDC Committee voted to approve the remaining
items in an amount not to exceed $829,984.
The PDC Committee further authorized the General Manager to enter into a sole source
contract with Temcor, the dome inspection company, for an amount not to exceed
$90, 110. This was done in an attempt to keep the inspection firm independent from the
engineering design firm.
Page 2
Q
ALTERNATIVES
Not issue Amendment No. 1 . If Amendment No. 1 is not issued, this additional work will
not be funded and the chances for the success of the project will significantly decrease
as staff believes that this work needs to be performed in order to provide the required
items for the safe and reliable operation of the primary treatment and odor control
facilities.
CEQA FINDINGS
This project was included in the OCSD's Strategic Plan Program Environmental Impact
Report (EIR). The EIR was certified on October 27, 1999 and a Notice of Determination
was filed on October 29, 1999. In addition, a Notice of Exemption was filed with Orange
County on February 24, 2004.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Letter from MPI dated July 18, 2005
RS:jo:cb:eh:ba:kf
H:\dept\agenda\PDC\2005\Agenda Reports\0905\05-93 -P2-80 -090105 REVISED.doc
Page 3
-0
BUDGET INFORMATION TABLE
PRIMARY TREATMENT REHABILITATION AND REFURBISHMENT
JOB NO. P2·80
..
PROPOSED
. .·
ORIGINAL CURRENT BUDGET PROPOSED· ·.I. FUNDS Tiils'':::: PRoPbseo TOTAL ·ESTIMATED . : ESTIMATED .
PROJECT/PHASE . AUTHORIZED PROJECT INCREASE REVISED. AUTHORIZED TO AUTHORiZATION AUTHORIZATION EXPENDITURE ExPENDEDTO
BUDGET BUDGET /DECREASE BUDGET DATE REQUESt ·TO DATE DATE(%)
. . . ...
Project Develooment $ 149,000 $ 149,000 $ 149,000 $ 149,000 $ 149,000 $ 148,704 100%
Preliminary Design $ 2,327,000 $ 2,327,000 $ 675,379 $ 3,002,379 $ 2,327,000 $ 675,379 $ 3,002,379 $ 2,050,968 68%
·.
Phase Design $ 4,358,000 $ 4,358,000 $ 154,605 $ 4,512.605 $ 4,358,000 $ 154,605 $ 4,512,605 $ 1,102,599 24%
Construction $ 84,620,000 $ 84,620,000 $ 84,620,000 $ 2,199,992 $ 2,199,992 $ 1,026 0%
Commissioning $ 292,000 $ 292,000 $ 292.000 $ 100,649 $ 100,649 $ (2,201) -2%
Close-Out $ 96,000 $ 96,000 $ 96,000 $ 47,944 $ 47,944 0% ·.
Contingency $ 12,308,000 $ 12,308,000 $ (829,9841 $ 11,478,016 . $ -#DIV/O!
PROJECT TOTAL $ 104, 150,000 $ 104,150,000 $ -$ 104, 150,000 $ 9,182,585 $ 829,984 $ 10,012,569 $ 3,301,096 33%
!Reimbursable Costs II
PROJECT NET $ 104.150,000 $ 104,150,000 $ 104.150,000 $ 9,182,585 $ 10,012,569 $ 3,301,096 33%
PSA/Contract .
·. Design PSA $ 5,778,518 $ 5,778,518 $ 829,984 $ 6,608,502 $ 5,778,518 $ 829,984 $ 6,608,502 $ 2,621,875 40%
Construction Contract $ -$ -$ -$ -
EDMS:003793255
Professional Services Agreement Status Report
PRIMARY TREATMENT REHABILITATION AND REFURBISHMENT
JOB NO. P2-80
Total Project Budget: $104,150,000
Consultant: Malcolm Pirnie, Inc. (MPI)
Date Amendment Description Cost
Design engineering services for upgrades to the odor
control facilities for the primary clarifiers in the North
3/24/04 Original and South Scrubber Complexes as well as the $5,778,518 rehabilitation and refurbishment of the concrete and
steel structures in the primary clarifiers in Plant No. 2.
Additional design services required for geotechnical
Pending Amendment 1 investigation services, deletion of loop diagrams,
switchgear replacement at the North Scrubber $829,984
Complex, and additional pipe inspection services.
RS:bja:eh:ba
EDMS:003793253
Accumulated
Costs
$5,778,518
$6,608,502
09/08/05
~~~~--~~~~~~~~~~~~~~~~~~~~~-M-A-LC-0-LM~Pl-RN-IE-.-.N-C-. ~~
IHDEPENDEtn ENVIRONMENTAL ENGINEERS. SCIENTISTS & CONSULTANTS
September 2, 2005
Mr. Robert Schirripa, P.E.
Project Manager
Orange County Sanitation District
P.O. Box 8172
Fountain Valley, CA 92728-8127
Re: Job No. P2-80
Primary Treatment Rehabilitation and Refurbishment
Purchase Order No. 101795-0B
Amendment No. I to the Professional Services Agreement
Dear Mr. Schirripa:
Enclosed please find a draft copy of Amendment No. 1 to the Professional Services
Agreement on the above referenced project. Amendment No. 1 includes the following
changes to the scope of services:
• Schedule A -Geotechnical Investigation Services:
• Schedule B -Delete Loop Diagrams:
• Schedule C -North Scrubber Complex Switchgear Replacement:
• Schedule E -Additional Influent and Effluent Piping Inspections:
$70,800
($45,526)
$15,289
$789,421
The total amount for these changes is $829,984. Please review the draft amendment and
let us know if you have any comments or questions. We are available at your
convenience to review the scope and fee for this amendment.
Very truly yours,
MALCOLM PIRNIE, INC.
/\{l~·
/iosenh)~. Lauria, P.E. ~Manager
OCSD Draft Amendment I 090205
Enclosures
0788-167
SCOi !RVINE CENTEF~ DHIVE SJITE ; :OG ~F'VH>J!:: CA f•2G :r: !:M9·45G-9H01 fr; .. 94:.;.45(!.~~.;02 h!lp.!/wwv..pimre.ccm
INDEPENDENT ENVIRONMENTAL ENGINEERS, SCll!NTISTS A CONSULTANTS
ORANGE COUNTY SANITATION DISTRICT
JOB NO. P2-80
PRIMARY TREATMENT REHABILITATION AND REFURBISHMENT
AMENDMENT NO. 1
SUMMARY BY WORK TASK
Exisitng Agreement
Amendment No. 1
To Task Number Description
2.3141.1 through 2.3141.10 Below Grade Influent & Effluent Piping $309,034.00 $675,379.00
2.3146.1 Kickoff Meeting, Data Collection $45,326.00 $0.00
2.3146.2 Foul Air System Study $60,486.00 $0.00
2.3146.3 Preliminary Design Report $1,184,199.00 $0.00
2.3146.5 Value Engineering Report $49,225.00 $0.00
2.3146.6 through 2.3146.10 General Design Services -Preliminary Design $551,668.00 $0.00
2.3158.4 Environmental Documentation $19,113.00 $0.00
3.3251.1 Design Submittal I (DS I) $746,491.00 $0.00
3.3251.7 through 3.3251.14 General Design Services -DS I $311,708.00 $114,043.00
3.3252.2 Design Submittal 2 (DS2) $762,776.00 $27,404.00
3.3252.7 through 3.3252.13 General Design Services -DS2 $291,081.00 $13,158.00
3.3253.3 Design Submittal 3 (DS3) $739,525.00 $0.00
3.3253.4 Final Design Submittal (FDS) $199,174.00 $0.00
3.3253.7 through 3.3253.13 General Design Services -DS3/FDS $372,623.00 $0.00
3.3254.6 Bid Support Services $136,089.00 $0.00
Totals: $5,778,518.00 $829,984.00
. .,
Amended A ment
$984,413.00
$45,326.00
$60,486.00
$1,184,199.00
$49,225.00
$551,668.00
$19,113.00
$746,491.00
$425,751.00
$790,180.00
$304,239.00
$739,525.00
$199,174.00
$372,623.00
$136,089.00
$6,608,502.00
Table 1. Phase 2. Prelimlnarv Design Services
PRELIMINARY DESIGN SERVICES INCLUDING:
Existing Amendment Amended
• MALCOLM PIRNIE, INC. Agreement No.1 Agreement
Burdened Labor $ 398,881 $ 15,000 $ 413,881
Overhead @ 95.00% $ 378,937 $ 14,250 $ 393,187
Profit @ 5.00% (Includes overhead and burdened labor) $ 38,891 $ 1,462 $ 40,353
Direct Costs $ 35,291 $ 1,200 $ 36,491
SUBTOTAL Malcolm Pirnie, Inc, not to exceed $ 852,000 $ 31,912 $ 883,912
• SUBCONSUL TANTS SERVICES
COM
Burdened Labor $ 137, 173 $ $ 137,173
Overhead @ 101.60% $ 139,368 $ $ 139,368
Profit @ 5.00% (Includes overhead and burdened labor) $ 13,827 $ $ 13,827
Direct Costs $ 21,300 $ $ 21 1300
SUBTOTAL COM Consulting Services, not to exceed $ 311,668 $ $ 311,668
Lee& Ro
Burdened Labor $ 333,721 $ $ 333,721
Overhead @ 99.00% $ 330,384 $ $ 330,384
Profit @ 5.00% (Includes overhead and burdened labor) $ 33,205 $ $ 33,205
Direct Costs $ 12!000 $ $ 12,000
SUBTOTAL Lee & Ro Consulting Services, not to exceed $ 709,310 $ $ 709,310
E2 Consulting
Burdened Labor $ 102,261 $ 107,944 $ 210,205
Overhead @ 75.00% $ 76,696 $ 80,958 $ 157,654
Profit@ 5.00% (Includes overhead and burdened labor) $ 8,948 $ 9,445 $ 18,393
Direct Costs ncludes National Plant, Eimco, and Charles King $ 114,500 $ 445,119 $ 559,619
SUBTOTAL E2 Engineering, not to exceed $ 302,405 $ 643,467 $ 945,871
Beyaz & Patel
Burdened Labor $ 20,951 $ $ 20,951
Overhead @ 94.50% $ 19,799 $ $ 19,799
Profit@ 5.00% (Includes overhead and burdened labor) $ 2,038 $ $ 2,038
Direct Costs $ 880 $ $ 880
SUBTOTAL Beyaz & Patel, not to exceed $ 43,668 $ $ 43,668
• SUBCONSULTANT FEES AT HOURLY RATE, NOT TO EXCEED
SUBTOTAL Subconsultant fees at hourly rate, not to exceed: $ $ $
TOTAL for Phase 2 Prellmlnary Design Services, not to exceed: $ 2,219,051 $ 675,379 $ 2,894,429
Table 2. Phase 3. Final Design Services
FINAL DESIGN SERVICES INCLUDING:
• MALCOLM PIRNIE, INC.
Burdened Labor
Overhead@ 95.00%
Overhead @ 5.00%
Direct Costs
SUBTOTAL
• SUBCONSULTANTS
COM
Burdened Labor
Overhead @ 101.60%
Profit @ 5.00%
Direct Costs
Existing
Agreement
Amendment
$ 640,287
$ 608,272
$
$
(Includes overhead and burdened labor) $ 62,428 $
Malcolm Pirnie, Inc, not to exceed
$ 42,013 $
$ 1,353,000 $
397,432 $
403,790 $
40,061 $
No.1
37,844
35,952
3,690
49i716
127,202
$
$
(Includes overhead and burdened labor) $
$ 33,700 __ $ __ _
SUBTOTAL CDM Consulting Services, not to exceed $ 874,983 $
Amended
Agreement
$ 678,131
$ 644,224
$ 66, 118
$ 91,728
$ 1,480,202
$ 397,432
$ 403,790
$ 40,061
$ 33,700
$ 874,983
Lee& Ro
Burdened Labor
Overhead@ 99.00%
Overhead @ 5.00%
Direct Costs
$ 482,406 $(15,457.00) $ 466,949
$ 477,582 $(15,302.00) $ 462,280
(Includes overhead and burdened labor) $ 47,999 $ (1,538.00) $ 46,461
$ 18,000 $ $ 18,000
TOTAL Lee & Ro Consulting Services, not to exceed $ 1,025,987 $(32,297.00) $ 993,690
Beyaz & Patel
Burdened Labor $ 128, 170 $ $ 128,170
Overhead @ 94.50% $ 121, 121 $ $ 121 ,121
Overhead @ 5.00% {Includes overhead and burdened labor) $ 12,465 $ $ 12,465
Direct Costs $ 4,000 $ $ 41000
TOTAL Beyaz & Patel, not to exceed $ 265,756 $ $ 265,756
• SUBCONSULTANT FEES AT HOURLY RATE, NOT TO EXCEED
DHK ( Noise Study) $ 39,742 $ -$ 39,742
Ninyo and Moore (Geotechnical Investigation) $ $ 59,700 $ 59,700
SUBTOTAL Subconsultant fees at hourly rate, not to exceed: $ 39,742 $ 59,700 $ 99,442
TOTAL for Phase 3 Design Services, not to exceed $ 3.559 468 $ 154 605 $ 3 714 073
Total for all Phase 2 and Phase 3 Design Services:!$ 5,778,5181 $ 829,9841$6,608,5021
PDC COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: David May, Project Manager
Meeting Date
09/01/05
Item Number
POC05·94
To Bd. of Dir.
09/28/05
Item Number
13(f)
SUBJECT: REHABILITATION OF ELLIS AVENUE PUMP STATION, JOB NO. 1-10
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 4 to the Professional Services Agreement with Malcolm
Pirnie, Inc., for Rehabilitation of Ellis Avenue Pump Station, Job No. 1-10, providing for
additional design engineering services for an additional amount of $899,979, increasing
the total amount not to exceed $4,799,255.
SUMMARY
This project will construct a new pump station, 66" gravity main, and 48" force main to
replace the existing Ellis Avenue Pump Station and force main. The existing station,
used to divert flow from upstream of Plant No. 2 to Plant No. 1, is rated for only 10 mgd,
receiving flow only from the Magnolia Trunk. The new pump station is to be rated for
50 mgd and will receive flows from the Magnolia, Knott and Miller-Holder trunk sewers.
A 33" gravity main is also required to allow flow diversion from the Miller-Holder trunk
sewer to the new pump station.
The requested Professional Services Agreement (PSA) amendment is based upon the
following changes or additions to the project Scope of Work (SOW):
• Additional engineering services are required for the design of the Bushard Diversion
Box (BOB). The flow control operating strategy and structural design of this
structure has increased in complication significantly with the decision to site the Ellis
Pump Station at Plant No. 1.
• Additional engineering services are required for tunneling design of the Ellis Avenue
Trunk Sewer. In order to minimize public impacts from construction, especially
traffic impacts, tunneling, instead of open cut trenching is being designed.
• Additional funds are being requested due to the project schedule extension. The
project is approximately two years longer than originally anticipated due to a lengthy
process to address public concerns over the pump station site selection. An
extended project schedule requires additional extended services from the consultant
and subconsultants. Additionally, an extended project schedule results in labor rate
escalations when services are actually performed later than originally scheduled.
Revised: 06/04/03 Page 1
• Though not requested as part of this PSA Amendment, it is expected that additional
construction services will be required for this project. The additional construction
services will be requested at the same time a construction contract award is
requested. The scope of the services will be better known at that time, resulting in a
more accurately negotiated fee for these additional services.
• Malcolm Pirnie, Inc. and staff agreed to $999,979 for the additional design
engineering services, but the previous Amendment (No. 3) included an extra
$100,000 for the additional design engineering services required. The $100,000
was authorized to keep the consultant working while Amendment No. 4 was being
negotiated. Therefore, this Amendment is for $999,979 minus $100,000 or
$899,979.
PRIOR COMMITTEE/BOARD ACTIONS
See attached PSA Status Report.
PROJECVCONTRACTCOSTSUMMARY
The total budget estimate for Rehabilitation of Ellis Avenue Pump Station, Job No. 1-10,
is $57,481 ,000. This request is for $899,979 for Amendment No. 4 to the PSA. If
approved, the amendment will bring the PSA total to $4,799,255. Authorized funds will
be moved from Contingency to the Design Phase to cover the additional cost. See
attached Budget Information Table for more information.
BUDGET IMPACT
~ This item has been budgeted. (Line item: Project 1-10, Page 8-46 of 2005/2006 FY Budget
Book) D This item has been budgeted, but there are insufficient funds. D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
The selection of the pump station site at Plant No. 1 resulted in additional scope of
service to design the BOB , and to design tunneling versus open cut trenching for the
Ellis Avenue Trunk. The operating strategy and control philosophy significantly
changed. There is approximately a 45 minute delay between the start of a flow request
at the Diversion Box to the time flow is actually received at the pump station. Strategies
on how to control this time delay at the pump station and in the piping between the BOB
and the pump station grew much more complex. Odor control, cleaning, surge flows to
Plant No. 1 headwork's and maintenance concerns at the pump station and the BOB
were some of the significant new design challenges.
Traffic impacts were noted as one of the significant and unavoidable impacts from this
project. To reduce these impacts, tunneling has been selected. Tunneling will reduce
traffic control requirements significantly as compared to open cut trench construction.
Revised: 06/04/03 Page 2
This method of construction was identified in the project EIR as a potential mitigation for
traffic impacts.
Approximately two years were spent collecting public input and investigating all feasible
options for the location of the proposed pump station. This puts all subsequent design
work approximately two years later than originally planned and budgeted. Planned
Design work based on 2003 and 2004 labor rates will be performed at 2005 and 2006
labor rates. Additional fees are requested to address the escalation of labor rates due
to the extension of the project schedule.
The location of the pump station in Plant No. 1 was not a basis for the original scope of
work. The selection of the pump station at Plant No. 1 has subsequently required
services to determine how the new facilities are to be powered. Meetings with
representatives from Southern California Edison revealed that no new service
connections can be made at Plant No. 1. Power will therefore need to be provided from
Sanitation District's Central Generation System. This will require upgrades to Power
Building 3A, as well as 12kV conduit runs from Power Building 3A to the new pump
station site. Other upgrades at the pump station site are required including
transformers, switchgear and conduit runs.
ALTERNATIVES
The additional services are necessary due to the changes in project work scope and will
allow completion of this project within defined constraints.
CEQA FINDINGS
A Project EIR was certified by the Board of Directors in May 2005.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Summary of Proposed Fees
DM:ba:kf
H:\dept\agenda\PDC\2005\Agenda Reports\0905\05-94 -1-10 -0901 OS.doc
Revised: 06104103 Page 3
:
PROJECT/PHASE
. ..
Phase 1 -Project Development
Phase 2 -Preliminarv Desi!::in
Phase 3 -Desian
Phase 4 -Construction
Phase 5 -Commissioning
Phase 6 -Close-Out
Phase 7 -Contingency
PROJECT TOTAL
!Reimbursable Costs
PROJECT NET
Desian PSA
Construction Contract
EDMS: 003791440
ORIGINAL
AUTHORIZED
BUDGET
$ 152,000 $
$ 2,325,000 $
$ 2,258,000 $
$ 44,217,000 $
$ 321,000 $
$ 67,000 $
$ 8,141,000 $
$ 57,481,000 $
BUDGET INFORMATION TABLE
REHABILITATION OF ELLIS AVENUE PUMP STATION
JOB N0.1-10
.,, <'" '. )_; .: ' 'l .. ,
CURRENT PROPOSED PROPOSED ·
., FUNDS: tHis
PROJECT BUDGET REVISED AUTHORIZED to AUTHORIZATION
BUDGET INCREASE BUDGET DATE REQUEST /DECREASE ',': .· .,,
152,000 $ 152,000 $ 152,000
2,325,000 $ 313,194 $ 2,638,194 $ 2,325,000 $ 313,194
2,258,000 $ 2,258,000 $ 2,258,000
44,217,000 $ 44,217,000 $ 1,916,000 $ -
321,000 $ 321,000 $ 260,000
67,000 $ 67,000 $ 24,000
8, 141,000 $ (313.194) $ 7,827,806
57,481,000 $ -$ 57,481,000 .. $ 6,935,000 $ 313.194
•. >{' ..
PROPOSED' ESTIMATED
TOTAL EXPENDITURE
AUTHORIZATION TO DATE
..
$ 152,000 $ 151,411
$ 2,638,194 $ 2,016,289
$ 2,258,000 $ 50,866
$ 1,916,000 $ 441
$ 260,000 $ 14,023
$ 24,000 $ -
$ -
$ 7,248,194 $ 2,233,030
$ 57,481,000 $ 57,481,000 $ 57,481,000 $ 6,935,000 $ 313,194 $ 7,248,194 $ 2,233,030
PSA/Contract
$ 3,186,027 $ 3,586,082 $ 313, 194 $ 3,899,276 $ 3,586,082 $ 313,194 $ 3,899,276 $ 1,683,515
$ 21,514,546 $ 41,571,687 $ -$ 41,571,687 : $ -$ -$ -
ESTIMATED
EXPENDED TO
:·DATE(%)
100%
76%
2%
0%
5%
0%
0%
31%
31%
43%
$ -
Total Project Budget:
Consultant:
Date
9/25/2002
11/19/2003
6/22/2005
8/24/2005
Pending
EDMS: 003793995
Professional Services Agreement Status Report
REHABILITATION OF ELLIS AVENUE PUMP STATION
JOB N0.1-10
$57,481,000
Malcolm Pirnie, Inc.
Amendment Description
Original PSA Engineering & Construction support services
1 Additional engineering services for investigation
into 11 alternative sites for pump station location
2 Modify contract language due to project duration
increase
Additional engineering services for additional
3 geotechnical investigations, additional utility
investigations, and additional survey services
Additional engineering services for Bushard
4 Diversion Box design, tunneling design, schedule
extension, and electrical design services
Cost
$3,186,027
$400,055
$0
$313,194
$899,979
08/26/05
Accumulated
Costs
$3,186,027
$3,586,082
$3,586,082
$3,899,276
$4,799,255
PDC COMMilTEE
AGENDA REPORT
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Milind Joshi, Project Manager
Meeting Date
09/01/2005
Item Number
PDC05-95
SUBJECT: SUNFLOWER INTERCEPTOR MANHOLE REHABILITATION,
CONTRACT NO. 7-21
GENERAL MANAGER'S RECOMMENDATION
To Bd. of Dir.
09/28/2005
Item Number
13(o)
Approve Amendment No. 6 to the Professional Service Agreement with Tran Consulting
Engineers for additional construction support services for Sunflower Interceptor
Manhole Rehabilitation, Contract No. 7-21 , for an additional amount of $29,600,
increasing the total amount not to exceed $614,295.
SUMMARY
• This contract is for the rehabilitation of 31 manholes arid pipeline point repairs
consisting of liner repairs at several locations on the Sunflower Interceptor sewer
line.
• This project includes lining of manholes with epoxy coating (15 manholes) as well
as with polyurethane coating (16 manholes). In the past, the majority of the
manholes have been rehabilitated using polyurethane coating and as such the
Orange County Sanitation District (OCSD) does not have substantial experience
with epoxy coating.
• In order to determine the performance of both types of coating that could be vital for
all future similar projects, it is necessary to establish uniform baseline conditions. At
this point in time, OCSD staff does not have sufficient experience in National
Association of Corrosion Engineers (NACE), Standards of the Society of Protective
Coatings (SSPC), and American Society for Testing and Materials (ASTM) standard
testing practices necessary to make that determination. Therefore, it will be
necessary to retain outside coating and surface preparation inspection services.
• The Third Party inspection services also include training for the Inspection staff at
OCSD that will benefit the OCSD for similar future projects and the need for the
Third Party inspection will greatly be reduced.
• The fees proposed for additional services are estimates prepared by Tran
Consulting Engineers and OCSD staff and are based on current project experience
and project needs. All work performed and billed will be on an as requested basis
by OCSD staff to support the project.
Page 1
PRIOR COMMITTEE/BOARD ACTIONS
See attached PSA Status Report
PROJECT/CONTRACT COST SUMMARY
See attached Budget Information Table for the explanation on the requested amount of
$29,600.
BUDGET IMPACT
[gJ This item has been budgeted. (Line item: Section 8 -Page 34 of Budget)
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
This project involves rehabilitating the manholes that involves coating of the manhole
interior for longevity. So far OCSD has been predominantly using polyurethane material
for coating. In this project, based on the Consultant's recommendation and
stakeholder's approval, two different types of coating materials -polyurethane and
epoxy will be used.
This project will provide vital information about the performance of both types of coating
that could be useful to OCSD to improve the longevity, performance, and costs saving
while maintaining hundreds of manholes that may need similar type of rehabilitation.
The Third Party inspection will be useful to establish uniform basis for performance
comparison. CSI has extensive background in inspecting corrosion resistant coatings
and their evaluation will be beneficial to OCSD in the long run.
ALTERNATIVES
None
CEQA FINDINGS
This project has been determined to be exempt from CEQA under Article 19
(Categorical Exemptions), Section 15301 (d) Existing facilities, restoration or
rehabilitation of deteriorated or damaged structures. A Notice of Exemption is being
filed.
ATTACHMENTS
1. PSA Status Report
2. Budget Information Table
MJ:eh:ba
H:\dept\agenda\PDC\2005\Agenda Reports\0905\05-95 -7-21 -0901 OS.doc
Page 2
!
•
ORIGINAL
PROjECT/PHASE AUTHORIZED·. ..
BUDGET
Phase 1 -Project Development $ 17,000 $
Phase 2 -Preliminary Design $ 215,000 $
Phase 3 -Design $ 264,400 $
Phase 4 -Construction $ 3,511,000 $
Phase 5 -Commissioning $ 482,300 $
Phase 6 -Close-Out $ -$
Phase 7 -Continaencv $ 897,900 $
PROJECT TOTAL $ 5,387,600 $
!Reimbursable Costs
PROJECT NET $ 5,387,600 $
Design PSA $ 561,760 $
Construction Contract $ 2,949,240 $
EDMS: 003787549
BUDGET INFORMATION TABLE
SUNFLOWER INTERCEPTOR MANHOLE REHABILITATION
CONTRACT NO. 7-21
PROP.OS ED
BUDGET CURRENT
PROJECT.···.•·;
BUDGET . ·.INCREASE> .
/DECREASE
35,521 $
185,243 $
727,006 $ -$
2.400,442 $
95,029 $
30,132 $
308,413 $ -$
3,781,786 $
3,781,786 $
584,695 $ 29,600 $
2,000,000 $
PROPOSED
REVISED:.: .
BUD~ETr'
35,521
185,243
727,006
FUNDS , THIS ;, .. PROPOSED ESTIMATED ESTIMATED
AUTtiORIZEP TO AUTHORIZATION ,,,,, · TOTAL•• EXPENDITURE ExPENDED.TO
. DATE . ~ REQUEST AtiTHORIZAftoN to DATE DATE(%) ·
$ 35,521 $ 35,521 $ 35,755 101%
$ 185,243 $ 185,243 $ 186,407 101%
$ 727,006 $ -$ 727,006 $ 820,287 113%
2,400,442 .... $ ___ 1,9_1_9_,6_42--t-$ ____ 2_,9 • ._60_0-+-$ __ 1 __ ,9_4 __ 9 . ._24_2-+-$ _____ 4 __ ._01_2_._ ____ ........
95,029 ,_$ ___ 7_6.._,3_17--t-------t-$""---7-'6,:..;..3_17-+-$;...... __ ...;.,:1,~30;;..;4-+-------1
30, 132 t-$""-__ 2_5.._,3_83--t-------t-$""-_ __.;;;2~5.~38;;.;3-+-$;;..._,, __ ___;.;45;;..;1-+-------1
·.
308,413 $ $
3,781,786 $ 2,969,112 $ 29,600 $ 2,998,712 $ 1,048,276 35%
3,781,786 $ 2,969,112 $ 2,998,712 $ 1,048,276 35%
PSA/Contract
614,295 $ 584,695 $ 29,600 $ 614,295
2,000,000 $ 1,519,200 $ -$ 1,519,200
Professional Services Agreement Status Report
SUNFLOWER INTERCEPTOR MANHOLE REHABILITATION
CONTRACT NO 7-21
Total Project Budget: $3,422,000
Consultant: Tran Consulting Engineers
Date Amendment Description
Provide physical inspection and engineering services
to evaluate the structural integrity of Bushard Trunk
Cost
1/17/2001 Original PSA Sewer 1-2-4 ($268,859), Santa Ana Trunk Sewer 1-17 $900,000
($300,207), Sunflower Interceptor Sewer 7-21
($330,935)
Contract No. 1-2-4: Additional labor, material, and
4/17/2001 1 equipment necessary to operate the flow diversion $24,990 structures. Increase original amount of $268,859 by
$24,990 to $293,849
Additional labor, material, and equipment necessary to
operate the flow diversion structures for Contract
9/06/2001 2 No.1-17 & No. 7-21. Increase original amount for $47,099 Contract No. 1-17 from $300,207 by $11,519 to
$311,726 and for Contract No. 7-21 from 330,935 by
$35,580 to $366,515
Contract No. 1-2-4: Additional labor, material, and
equipment necessary to set-up and remove by-pass
410412002 3 pumps, flow evaluation, field investigation, and $12,515
technical analysis. Increase original amount from
$293,849 by $12,515 to $306,364
Page 1of2
~.. . _.._1
Accumulated
Costs
$900,000
$924,990
$972,089
$984,604
Contract No. 7-21: Additional engineering services
necessary for the design of rehabilitation of the
5/20/2004 4 manholes and portions of trunk sewers. Increase $152,093 $1, 136,697
original amount from $366,515 by $152,093 to
$518,608
Contract No. 7-21: Additional engineering services
necessary to develop and test a diversion plan
4/27/2005 5 including flow rate measurement necessary for the $66,087 $1,202,784
pipeline repair. Increase original amount from
$518,608 by $66,087 to $584,695
Contract No. 7-21: Additional engineering services
Pending 6 necessary to inspect the new type coating/s in $29,600 $1,232,384 (*) accordance with NACE, SSPC, and ASTM standard
testing practices
(*) This Professional Service Contract (PSA) covers three separate projects and the accumulated cost is for the combined contract.
The total not to exceed amount for Engineering Services for Sunflower Interceptor Manhole Rehabilitation, Contract
No. 7-21, is $614,295. The balance of the cost is for work on the Santa Ana Trunk Sewer, Contract No. I -17, and the
Bushard Trunk Sewer, Contract No. 1-2-4
EDMS: 003763698
Page 2 of 2
MINUTES OF FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE MEETING
Orange County Sanitation District
Wednesday, September 14, 2005, 5:00 p.m.
A meeting of the Finance, Administration and Human Resources Committee of the Orange
County Sanitation District was held on September 14, 2005, at 5:00 p.m., in the Sanitation
District's Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
FAHR COMMITTEE MEMBERS:
DIRECTORS PRESENT:
Roy Moore, Chair
Mike Duvall, Vice Chair
Bill Dalton
Rich Freschi
Phil Luebben
Joy Neugebauer
James W. Silva
Mark Waldman
DIRECTORS ABSENT:
Steve Anderson, Board Chair
Jim Ferryman, Vice Board Chair
STAFF PRESENT:
Bob Ghirelli, Director of Technical Services
Jim Herbert, Director of Operations and Maintenance
Lisa Tomko, Director of Human Resources
Mike White, Acting Director of Finance/Treasurer
Lilia Kovac, Committee Secretary
OTHERS PRESENT:
Carolyn Cavecche, OMTS Chair
Brad Hogin, General Counsel
Ed Soong, Orrick, Herrington & Sutcliffe
Mahin Talebi
Norbert Gaia
Bob Geggie
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Chair Moore had no report.
(5) REPORT OF THE GENERAL MANAGER
Bob Ghirelli, Acting General Manager reported that a Sanitation District employee who is a member
of the Sanitation District's emergency medical response team has volunteered on his own personal
time through the Red Cross, to assist in a shelter for the victims of Katrina in the Gulf Coast. An
agenda report is being drafted by HR to identify all aspects of liability for the Sanitation District to
provide assistance in disasters such as the recent hurricane in the Gulf Coast. The Board will be
presented with an agenda report and a policy resolution that will direct management how to respond
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page2
September 14, 2005
to similar situations. Some concern was expressed by directors over the proper use of public funds
for assisting in times of disaster, and agreed that a resolution should be presented to the Board of
Directors for adoption.
(6) REPORT OF DIRECTOR OF FINANCEITREASURER
Mike White, Acting Director of Finance, informed the Committee members that the FY 2005-06
Investment Policy document is now being provided to them at this meeting. This document
includes the Investment Policy Statement, a summary of the investment authorization, Treasury
Management Procedures, the most recent monthly and quarterly program monitoring reports,
and sections of the California Government Code pertaining to the investment of public funds.
(7) REPORT OF DIRECTOR OF HUMAN RESOURCES
Lisa Tomko, Director of Human Resources, had no report.
(8) REPORT OF DIRECTOR OF PUBLIC AFFAIRS
Carol Beekman, Director of Public Affairs, was absent.
(9) REPORT OF GENERAL COUNSEL
Brad Hogin, General Counsel, had no report.
(10) CONSENT CALENDAR ITEMS
a. Approve minutes of the July 6, 2005, Finance, Administration and Human Resources
Committee meeting.
b. FAHR05-68 Recommend to the Board of Directors to receive and file Treasurer's
Report for the month of August 2005.
c. FAHR05-69 Receive and file Certificates of Participation (COP) Monthly Report.
d. FAHR05-70 Receive and file Employment Status Report as of August 22, 2005.
e. FAHROS-71 Receive and file OSHA Incidence Rates and Workers' Compensation
Claims and Costs Report.
f. FAHROS-72 Item pulled for discussion.
g. FAHROS-73 Recommend to the Board of Directors to adopt Resolution No. OCSDOS-
_, amending Resolution No. OCSD 98-33, amending Human Resources
Policies and Procedures Manual.
h. FAHROS-74 Recommend to the Board of Directors to receive and file SWAP Report
for the quarter ended June 30, 2005.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page3
September 14, 2005
i. FAHR05-75 Recommend to the Board of Directors to receive and file Quarterly
Investment Management Program Report for the period April 1, 2005
through June 30, 2005.
MOTION: It was moved, seconded and duly carried to approve the recommended
actions for items specified as 1 O(a) through (e) and (g) through (i) under
Consent Calendar.
END OF CONSENT CALENDAR
f. FAHROS-72 Recommend to the Board of Directors to receive and file report of
MOTION:
General Manager approved purchases in amounts exceeding $50,000 in
accordance with Board purchasing policies.
Directors inquired about the blanket purchase order issued to American
Airlines for $99,999 which appears excessive for the Sanitation District's
travel needs. Mike White, Acting Director of Finance explained the
blanket purchase order only works as a mechanism to issue travel tickets,
after an employee has the appropriate management approvals. Staff will
report back to the committee on the procedures used in securing airline
reservations.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
(11) ACTION ITEMS
a. FAHR05-76 Approve staff's listing of proposed underwriters for consideration on the
MOTION:
issuance of up to $200 million in certificates of participation (COP).
Mike White, Acting Director of Finance, referred to the agenda report
listing 1 O recommended firms, all of which provide strong remarketing
services, for consideration to serve as underwriters on the proposed
issuance of the $200 million in variable rate certificates of participation. It
was pointed out that there was a potential appearance, but not in fact, of
a conflict of interest with Banc of America, one of the firms being
recommended for consideration. There were no objections to include
Banc of America as one of the firms to be considered.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
b. FAHR05-77 Authorize staff to solicit proposals from outside auditing firms to serve as
the District's internal auditors for a three year period beginning with fiscal
year 2005-06, to narrow the selection to three finalists, and to schedule
interviews with selected members of the Committee.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page4
September 14, 2005
MOTION:
Mike White, Acting Director of Finance, presented the request to solicit
proposals for internal auditing services from outside auditing firms for up
to 600 hours annually; an increase from the previous quantity of 300
hours annually. The increase in hours was recommended by the FAHR
Committee in July 2005 due to the size and complexity of the Sanitation
District. The proposed number of hours will assist in providing a thorough
analysis of the Sanitation Districts accounting processes and procedures
to ensure that all related internal controls are well designed, properly
implemented, and adequately maintained. This effort would be similar to
the new private sector internal control reporting requirements under the
Sarbanes-Oxley Act.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
c. FAHR05-78 Recommend to the Board of Directors to: (1) Authorize the General
Manager to transfer to Newport Fab, LLC, the flow baseline as defined by
Ordinance No. OCSD-26 previously established at the same discharge
location by a company known as Conexant; and,
MOTION:
(2) to initiate the process to amend Ordinance No. OCSD-26 to clarify the
policy for transferring baselines from an Existing User to a New User.
Bob Ghirelli, Director of Technical Services, presented the committee a
request made by Newport Fab to transfer the flow baseline based on
ownership retained by Conexant, that due to Ordinance changes, had
increased their rates substantially. The Directors expressed the need to
establish a set policy that identifies what constitutes a need for granting
similar transfer of flow baselines, and that the definition of a transfer
should be identified as a legal transfer of ownership, requiring 51 % or
more ownership interest be retained as a quantifiable ownership to qualify
for exemption.
It was moved, seconded and duly carried to recommend to the Board to:
(1) Deny Jazz Semiconductor's request to use Conexant flow baseline for
purposes of rates charged; and,
(2) Direct staff to bring back to the Board an amendment to Ordinance
No. OCSD-26 addressing the transfer of flow baselines and identifying
ownership interests retained as 51 %, instead of 25%.
(12) INFORMATIONAL PRESENTATIONS
a. FAHR05-79 Asset Management
Jim Herberg, Director of Operations and Maintenance, provided an
overview of the asset management program and responded to Directors'
questions.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page5
September 14, 2005
(13) CLOSED SESSION
There was no closed session.
(14) OTHER BUSINESS. COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS. IF
ANY
There were none.
(15) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(16) CONSIDERATION OF UPCOMING MEETINGS
The next FAHR Committee meeting is scheduled for October 12, 2005 at 5 p.m.
(17) ADJOURNMENT
The Chair declared the meeting adjourned at 6:35 p.m.
Submitted by:
~~
Lilia Kovac
FAHR Committee Secretary
H:\dept\agenda\FAHR\FAHR2005\0605\060805 FAHR Minutes.doc
... ~
I ..
'1 •
't
FAHR COMMITTEE Meeting Date To Bd. of Dir.
9/14/05 9/28/05
AGENDA REPORT Item Number Item Number
FAHR05-68 14(b)
Orange County Sanitation District
FROM: Michael D. White, Controller
SUBJECT: TREASURER'S REPORT FOR THE MONTH OF AUGUST 2005
GENERAL MANAGER'S RECOMMENDATION
Receive and file Treasurer's Report for the month of August 2005.
SUMMARY
Pacific Investment Management Co. (PIMCO), serves as the Orange County Sanitation
District's professional external money manager, and Mellon Trust serves as the
Sanitation District's third-party custodian bank for the investment program. Some funds
are also deposited in the State of California Local Agency Investment Fund for liquidity.
The Sanitation District's Investment Policy, adopted by the Board, includes reporting
requirements as listed down the left most column of the attached PIMCO Monthly
Report for the "Liquid Operating Monies" and for the "Long-Term Operating Monies"
portfolios. The Sanitation District's external money manager is operating in compliance
with the requirements of the Investment Policy. The portfolio contains no reverse
repurchase agreements.
As shown on page 2 of the attached PIMCO's Performance Monitoring and Reporting
Report for the Long-Term Operating Monies, there is one investment policy compliance
exception. It pertains to the holding of one security within PIMCO's Long-Term
Operating Monies Portfolio that had an acceptable rating at the time of purchase but
has since fallen below the minimum rating allowed by the investment policy. The
Sanitation District's investment policy requires a minimum rating of A3 by Moody's or A-
by S&P, with at least a BBB rating in the event of a split rating, at the time of purchase.
The rating exception pertains to the holding of a United Airlines (UAL) Asset Backed
Security with a par value of $1.6 million, representing 0.47 percent of the portfolio
holdings, whose rating from Moody's has fallen several times, from A3 to BA 1, then to
BA3, B3, B, and finally to CA. Likewise, the rating from Standard & Poor's has also
fallen several times, first from A-to BBB, then to BB, then to B+, B-, and finally to
CCC+. Both rating agencies have since withdrawn their ratings, Moody's in February
2004 and Standard & Poor's in June 2004. Although these ratings are less than what is
required at the time of purchase, PIMCO believes, based on the financial strength of
UAL and the underlying collateral of the security, that the Sanitation District would suffer
an unwarranted loss if the security was sold at this time.
The Sanitation District's investment policy does not require any action because of
"credit watch" notices or the decline in credit standing. However, PIMCO will continue
to monitor the credit for this security very closely.
C:\Documents and Settlngs\kawai\local Settings\ Temporary Internet FileslOLK721AgendaAeport_ TAEASRPT091405.doc Page 1
Historical cost and current market values are shown as estimated by both PIMCO and
Mellon Trust. The Sanitation District's portfolios are priced to market ("mark-to-market")
as of the last day of each reporting period. The slight differences in value are related to
minor variations in pricing assumptions by the valuation sources at the estimate date.
BUDGET IMPACT
D This item has been budgeted. (Line item: )
D This item has been budgeted, but there are insufficient funds. D This item has not been budgeted.
IZ] Not applicable (information item)
ADDITIONAL INFORMATION
Schedules are attached summarizing the detail for both the short-term and long-term
investment portfolios for the reporting period. In addition, a consolidated report of
posted investment portfolio transactions for the month is attached. The attached yield
analysis report is presented as a monitoring and reporting enhancement. In this report,
yield calculations based on book values and market values are shown for individual
holdings, as well as for each portfolio. Mellon Trust, the Sanitation District's custodian
bank, is the source for these reports. Transactions that were pending settlement at
month end may not be reflected. Also provided is a summary of monthly investment
balances and transactions within the State of California Local Agency Investment Fund
(LAIF).
These reports accurately reflect all Sanitation District investments and are in
compliance with the Sanitation District's Investment Policy and previous requirements of
California Government Code Section 53646.
Government Code Section 53646 mandated that annual investment policies and
quarterly reports be rendered to the legislative body. AB2853, which was signed on
September 29, 2004, amends Government Code Section 53646 to remove the
requirements; the rendering of these documents is optional.
Although the Annual Investment Policy and Monthly and/or Quarterly Reports are no
longer required, we believe it prudent to continue providing the legislative bodies with
these documents. In addition, Government Code Section 53607 has not been repealed
that requires an annual delegation of investment authority to the Treasurer and the
submission of reports that include investment transactions by month.
Sufficient liquidity and anticipated revenues are available to meet budgeted
expenditures for the next six months.
The tables on the following page details the book balances of the Sanitation District's
investment accounts at month-end and a ·summary of the Cost of Funds on debt issues.
A graphical representation of month-end balances is shown on the attached bar chart.
C:\Documenls and Sellings\kawai\Local Settings\Temporary lnlemet Files\OLK72\AgendaRepon_TREASRPT091405.doc
Page2
" '
, -
Book Balances Estimated
Investment Accounts August 31, 2005 Yield(%)
State of Calif. LAIF $ 7,580,808 3.18
Union Bank Checking Account 921,842 2.96 (1)
Union Bank Overnight Sweep Account 0 2.79
PIMCO -Short-term Portfolio 39,084,805 3.65
PIMCO -Long-term Portfolio 292,304, 130 4.30
Petty Cash 4.000 NIA
TOTAL S339 895 585 4.12
Debt Service Reserves wfTrustees S63 9586~8 3.88
.. (1) This 1s the annuahzed yield for the month of July. The August annualized rate was not
available as of the date of this report.
Cost of Funds
Issue Description
1992 Syn Fixed
1993 Syn Fixed
2000VRDO
2003 Fixed
TOTAL
Weighted Avg Cost of Funds
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
Annual
Outstanding Interest
COP Balance Rate(%)
$ 100,275,000 5.55
42,050,000 4.56
199,000,000 2.26
280.000.000 5.15
S62l 325 000
4.25
1. Graph of Monthly Investment Balances by Type -Last Six Months
2. Investment Transactions and Balances in the State Local Agency Investment Fund
3. PIMCO Monthly Investment Recap & Yield Analysis Report
4. PIMCO Performance Monitoring Report -Liquid Operating Monies
5. PIMCO Performance Monitoring Report-Long-Term Operating Monies
6. Mellon Trust Asset Summary by Asset Type with Sectors -Liquid Operating Monies
7. Mellon Trust Asset Summary by Asset Type with Sectors -L-T Operating Monies
8. Mellon Trust Yield Analysis Report
9. Mellon Trust Asset Detail -Consolidated
10. Mellon Trust Transaction Detail -Consolidated
MW:bg
C:\Documents and Settings\kawai\Local Settings\ Temporary Internet Files\OLK72\AgendaReport_ TREASRPT091405.doc Page3
I $100,000,000
I . $600,000,000
$500 '000 ,000 -
$300,000,000
Monthly Investment Balances by Type-
Last Six Months
-------------~-------· --------------------------------!
March
2005
April
2005
May
2005
June
2005
g PIMCO -Long-term r2I PIMCO -Short-term ISi COP Debt Reserves
~LAIF IJ Bank Accts EilPetty Cash
July
2005
August
2005
Orange County Sanitation District
Investment Transactions and Balances in the
State of California Local Agency Investment Fund
August 31, 2005
Par Value Book Value Market Value
Balance
August 1, 2005 $10,780,808 $10,780,808 $10,780,808
Deposits:
8/4/2005 10,000,000 10,000,000 10,000,000
8/11/2005 4,100,000 4,100,000 4,100,000
8/31/2005 7,500,000 7,500,000 7,500,000
Total Deposits 21,600,000 21,600,000 21,600,000
Withdrawals:
8/1/2005 (4,500,000) (4,500,000) (4,500,000)
8/3/2005 (2,200,000) (2,200,000) (2,200,000)
8/17/2005 (2,500,000) (2,500,000) (2,500,000)
8/25/2005 (15,600,000) (15,600,000) (15,600,000)
Total Withdrawels (24,800,000) (24,800,000) (24,800,000)
Balance
August 31, 2005 $7,580,808 $7,580,808 $7,580,808
Rate Yield
3.18 3.18
3.18 3.18
3.18 3.18
3.18 3.18
3.18 3.18
3.18 3.18
3.18 3.18
3.18 3.18
3.18 3.18
3.18 3.18
3.18 3.18
-1
PIM C 0
September 9, 2005
Mr. Mike White, CPA
Contro11er
Orange County Sanitation District
I 0844 Ellis A venue
Fountain Valley, CA 92708-7018
Dear Mike:
The following is a description of events in the bond markets during the month of August in
addition to an analysis of the strategies undertaken in the Orange County Sanitation District's
Long-Tenn and Liquid portfolios over the period. Also included is a section on our outlook and
preferred strategies to be pursued in your portfolios during the coming months.
B011d Market Recap:
The bond market rallied in August as most fixed income sectors posted positive returns. U.S.
Treasuries returned 1.28 percent during the month, outperforming the S&P 500 return of -0.91
percent. Yields on U.S. Treasuries with maturities between 2 and 30 years felJ, while shorter-tenn
rates rose in concert with continued Fed tightening. Mortgage-backed securities returned 0.89
percent, slightly underperfonning Treasuries by 13 basis points after adjusting for duration.
Corporate bonds returned 1.52 percent as measured by the Lehman Credit Index, underperforming
Treasuries by 18 basis points after adjusting for duration. Lower quality investment.grade
corporates underperformed higher quality issues, as BBB-rated bonds trailed Treasuries by 43 basis
points on a duration-adjusted basis. High yield bonds underperformed both Treasuries and
investment-grade issues across the quality spectrum, with the Lehman High Yield Index returning
0.19 percent. The Lehman U.S. TIPS Index returned 2.31 percent in August, surpassing
comparable nominal Treasuries for the month.
The benchmark 10-year Treasury yield endured a volatile August, ending the month at 4.01
percent, 27 basis points lower than the beginning of the month. U.S. Treasury yields rose the first
week of the month on signs of continued growth in the U.S. economy: business activity in the
manufacturing sector exceeded analysts' expectations as the ISM Index increased to 56.6 in July, a
207,000 increase in non-farm payrolls was higher than forecasted, and personal income and
spending both rose. In addition, the Federal Open Market Committee (FOMC) raised short-term
rates a quarter point for the 10th consecutive time to 3.50 percent, reiterating that inflation is well
contained and hinting at further "measured,, rate increases. Intra-month, the yield on the I 0-year
Treasury note reached a high of 4.42 percent only to reverse course the remainder of August. The
decline in yields was largeJy driven by higher energy costs, as oil prices approached 70 dollars a
Mr. Mike White, CPA
Orange County Sanitation District
September 9, 2005
Pagel
barrel. Hurricane Katrina added further downward pressure on interest rates as the disaster clouded
the prospects for continued strong economic growth. Providing further support for Treasuries were
weaker than expected increases in retail sales, a widening U.S. trade deficit, and increases in
foreign demand for U.S. assets. On the inflation fron~ higher energy costs drove July headline
consumer and producer prices to increase for the first time in three months. The Labor Department
reported that CPI gained 0.5 percent while Core CPI gained 0.1 percent, increasing the annual rate
to 3.2 percent and 2.1 percent respectively. GDP growth for the second quarter was revised from
3.4 percent to 3.3 percent annualized, a slight decrease from the 3.8 percent growth rate in the first
quarter.
Treasury yield changes during the month of August are summarized as follows:
• 3-month bills: + 10 basis points to 3.50%
• 6-month bills: + 3 basis points to 3.71%
• 2-year notes: -20 basis points to 3.81%
• 5-year notes: -26 basis points to 3.86%
• 10-year notes: -26 basis points to 4.01 %
• 30-year notes: -22 basis points to 4.25%
Performance Attribution:
Long-Term Portfolio
The Long-Term portfolio that PIMCO manages on behalf of Orange County Sanitation District
returned 1.01% on a totaJ return basis for the month of August, outperfonning the Merrill Lynch 1-
5 year Government Corporate Index by 13 basis points. The following points summarize returns
for the month ended August 31 :
• The Long-Tenn portfolio outperformed the benchmark by 13 basis points for the month.
• For the twelve-month period, the Long .. Tenn portfolio returned 2.37%, outperforming the
benchmark by 85 basis points.
• Portfolio duration, below the benchmark, was slightly negative for monthly perfonnance
as interest rates generally fell across the yield cwve.
• Yield curve positioning similar to that of the index was neutral for perfonnance.
• An underweight exposure to corporates was positive for perfonnance as the credit sector
underperformed Treasuries on a duration-adjusted basis.
• Exposure to mortgage-backed securities was negative for performance as the sector
lagged Treasuries on a duration-adjusted basis.
Liquid Portfolio
The Liquid portfolio that PTh4CO manages on behalf of Orange County Sanitation District
generated a total return of 0.29% during the month of August, slightly outperfonning the 3-month
Treasury Bill Index. The following points summarize returns for the period ending August 31:
v Mr. Mike White, CPA
Orange County Sanitation District
September 9, 2005
Page3
• The Liquid portfolio outperformed the benchmark by 2 basis points for the month.
• For the twelve-month period, the Liquid portfolio returned 2.49%, outperforming the
benchmark by 13 basis points.
• Use of higher yielding securities such as commercial paper and short-tenn notes
contributed to perfonnance.
Outlook and Strategy:
Over the past few years PIM:CO's Secular Outlook has described the tension between disinflation
and reflation. The forces of disinflation will be stronger over the next several years, which will
foster an environment of low and even declining global interest rates. A global free trade-based
economy with a surfeit of cheap Asian labor, along with waning fiscal and monetary stimulus, will
suppress inflation. U.S. inflation is not likely to exceed 3 percent even if already low interest rates
fall further. The same applies for Euroland and Japan, with potential for 1-2 percent CPI
throughout much of the global economy over the next five years.
This environment will be favorable for high quality bonds. A range of 3-4Yi percent for the yield
on ten·year Treasuries should prevail over the next several years. Yields on Euroland bonds will
be slightly lower due to the region's structural economic problems, disinflationary incorporation of
new Central and Eastern European entrants and growth-inhibiting demographics. Important
aspects of our secular outlook are:
• Brctton Woods II Has Life -Under the so-called Bretton Woods II arrangement, Asian central
banks invest their savings in Treasuries to prevent their currencies from appreciating relative to the
U.S. dollar, thereby helping finance the U.S. trade deficit. While a substantial Chinese currency
revaluation or an erosion of U.S. consumer confidence could undennine BW II, mutual self-interest
should sustain this de facto monetary union for the time being. It provides Asian producers with
cheap, export-stimulating currencies. U.S. consumers, meanwhile, obtain low cost imports and
enjoy interest rates perhaps 100 basis points lower than would otherwise be the case.
• The "Pump" Is Near Its Limit-Over the past five years falling real interest rates associated with
BW II and the Federal Reserve's accommodative monetary policy have pumped up valuations of
risky assets. These gains stand in contrast to prior periods when asset price appreciation was
generated by surging productivity or advances in technology. The effect of the Pump has been to
create weahh that has sustained U.S. consumption and kept the global economy going. The Pump
is best exemplified by the yield on 5-year TIPS, which has fallen from 4 percent five years ago to 1
percent today. If 3 percent inflation is all the U.S. has gotten from the Pump, it seems unlikely that
we will get more inflation even if real yields fall further.
• Low Returns From Riskier Assets -Price inflation in real estate, stocks, corporate bonds and
other riskier assets can only be pumped a little further by monetary policy and BW II given already
low yield levels. PIMCO is not forecasting a collapse in home values or the stock market, but we
believe that we are surely heading down the home stretch of the U.S. race to prosperity based on
asset price appreciation.
Mr. Mike White, CPA
Orange County Sanitation District
September 9, 2005
Page4
• Leveraged Investments Pose Systemic Risk -Abundant liquidity in financial markets associated
with the Pump has allowed for increased leverage and also quicker exits from investment
strategies. Leverage throughout the global financial system wiU pose a danger to risk-oriented
markets such as stocks, high yield bonds, complex debt structures such as collateralized debt
obligations (CDOs) and rea] estate as owners realize that their returns can no longer be pumped up
anywhere near double-digit expectations. An unwinding of leveraged structures, which could
occur even amid economic growth, would roil financial markets and shake confidence.
• Geopolitical Risks -Flash points around the world include North Korea, Taiwan and Iran. An
eruption in any of these areas, while impossible to forecast, could undennine the economic stability
provided by BW II.
To the extent that guidelines allow, PIM CO will employ a diverse range of strategies to enhance
portfolio yield while still protecting investors' capital if macroeconomic stability unravels. Key
strategies will include:
• Duration and Yield Curve -We will maintain tactical flexibility in a low interest rate world.
When rates are near the high end of our forecasted range, we will extend duration moderately
above the benchmark to capture the benefits of continued disinflation. As rates fan to the lower
end of the range, our duration targets will be shortened. While maintaining a neutral yield curve
posture overall, we will continue to take selective longer maturity exposure in TIPS, as high
quality, longer maturity bonds will be attractive in a disinflationary environment. Longer maturity
TIPS should continue to benefit from low and stable real yields. Moreover, the asset class still
provides relatively cheap protection against inflation
• Emphasize Mortgage Security Selection -Mortgage~backed bonds will remain an important
structural holding because of their current high credit quality and yield advantage versus
Treasuries. Given relatively full valuations in this sector, PIMCO seeks to add value via coupon
and security selection.
• Corporate Strategy -Corporate credit premiums overall remain near historic lows, and
disinflation will not be friendly to corporate revenues. PIMCO will continue to underweight this
sector, though we may opport\lllistically add to our holdings if credit premiums widen for select
issues.
We look forward to discussing these and other topics with you in the near future.
Best regards,
Christine Telish, CF A
Vice President
John M. Miller, CFA
Senior Vice President
v
Orange County Sanitation District
for the month ending August 31, 2005
Total Return Account -203
With Accrued Interest
Market Value
Book Value
Yield to Maturity
Short Term Account -603
294,446. 731
292,290,439
4.30
With Accrued Interest
Market Value
Book Value
Yield to Maturity
39,294.439
39~275,197
3.65
Without Accrued Jntcrest
292,369, 753
290,213,461
4.34
Without Accrued Interest
39,109,525
39~090,283
3.67
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 August 2005)
Liq11id Operating Mo11ies (603)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
• PIM CO • Mellon
Historical Cost:
• PIM CO
• Mellon
15.1.2 MODIFIED DURATION Of Portfolio:
Of Index:
15.1.3 1% INTEREST RATE CHANGE Dollar Impact (gain/loss) of I% Cham?e:
15.1.4 REVERSE REPOS % of Portfolio in Reverse Repos:
(see attached schedule)
15.1.5 PORTFOLIO MATURITY % of Portfolio Maturing within 90 davs:
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality:
15.1.7 SECURITIES BELOW "A" RA TING % of Portfolio Below "A":
15.1.8 INVESTMENT POLICY COMPLIANCE "In Compliance"
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%) by
Period:
I Month:
3 Months:
12 Months:
Fiscal Year-to-Date:
Co111me11tary
• The Liquid portfolio outperfonned the benchmark by 2 basis points for the month, and outperfonned the benchmark by S basis points fiscal year-to-date.
• PIMCO's emphasis on higher yielding securities such as commercial paper and short-tenn notes contributed to perfonnance.
ll:\dep1\fln\220\gr111:le\FAllR\UQOBOO-OS-08.RPT.doc
Page 1of1
$39,294,439
$39,289,828
S39,275, 197
$39,294,108
0.16
0.20
$62,871
0%
78%
"AAA"
0%
Yes
Portfolio Index
0.29 0.27
0.82 0.76
2.49 2.36
0.57 0.52
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 August 2005)
Lo11g-Term Operati11g Mo11ies (203)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
• PIM CO • Mellon
Historical Cost:
• PIM CO
• Mellon
15.1.2 MODIFIED DURATION Of Portfolio:
Of Index:
15.1.3 1 % INTEREST RA TE CHANGE Dollar Impact (gain/loss) of 1 % Chan~e:
15.1.4 REVERSE REPOS % of Portfolio in Reverse Repos:
(see attached schedule)
15.1.5 PORTFOLIO MATURITY % of Portfolio Maturing within 90 days:
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality:
15.1.7 SECURITIES BELOW "A" RA TING % of Portfolio Below 11A11:
15.l.8 INVESTMENT POLICY COMPLIANCE "In Compliance"
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return (%) by
Period:
I Month:
3 Months:
12 Months:
Fiscal Year-to-Date:
• The Long-Tenn portfolio outperfonned the benchmark by 13 basis points for the month. and outperformed the benchmark by 26 basis points fiscal year-to-date.
• Portfolio duration, below the benchmark. was slightly negative for monthly performance as interest rates generally fell across the yield curve.
• Yield curve positioning similar to that of the index was neutral for performance.
An underweight exposure to corporates was positive for perfonnance. as the credit sector underperformed Treasuries on a duration-adjusted basis.
• Exposure to mortgage-backed securities was negative for performance as the sector lagged Treasuries on a duration-adjusted basis.
Page I o/2
$294,446, 731
$294,429,549
$292,290,439
$294,098,990
2.37
2.42
$6,978,388
0%
4%
AAA
0%
No*
Portfolio Index
l.01 0.88
0.95 0.64
2.37 1.52
0.60 0.34
*Compliance Issues:
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 August 2005)
Page 2of2
$ 1 ,600,000 par of United Airlines (UAL) Pass-Through 2001-1-C (Enhanced Equipment Trust Certificate (EETC) -909317BC2), 6.831 % coupon,
3/01/2010 maturity, representing 0.54% of the portfolio holdings on a par basis was purchased on 8/10/2001; and subsequently downgraded by Moody's
from A3 to BA 1 (on 9/18/2001) and S&P from A-to BBB (on 9/20/2001 ). The security was further downgraded by Moody's from BA I to BA3 (on
12/21/2001) and by S&P from BBB to BB (on 6/28/02). Following news ofthe possible bankrnptcy filing, the security was further downgraded in August
(B3 Moody's, B+ by S&P). On November 29, 2002, S&P further downgraded this issue to B, and shortly thereafter on December 9, 2002, downgraded the
issue one notch further to B-. On August 7, 2003, S&P downgraded the issue to CCC+, while Moody's followed suit on August 28, 2003 with a downgrade
to CA. Both rating agencies have since withdrawn their ratings (Moody's withdrew in February 2004 and S & P withdrew in June 2004). The District's
investment policy requires a minimum rating of A3 by Moody's or A-by S&P, with at least a BBB rating in the event of a split.
On September 7, UAL filed its reorganization plan. which targets February I, 2006 as its exit date from Chapter 11. The plan includes up to $3 billion in exit
financing that ensures the airline will be able to compete in an industry battered by record-high fuel costs and low-fare competition. The airline has cut costs by $7
billion, restructured contracts with its United Express unit, dumped underfunded pension plans, renegotiated labor contracts and shrunk its workforce to 60,000 from
80,000 employees. Most recently, UAL reported a net loss of$274 million for July, including $350 million in expenses related to reorganization.
UAL said in court documents it may offer unsecured creditors the chance to buy about $500 million in new UAL common stock, but when it exits bankruptcy its
existing shares will be worthless. UAL said it would issue up to 125 million shares of UAL common stock when it emerges. The company has said it has received
proposals for up to $3 billion in exit financing, above the $2.5 billion all-debt financing it had requested.
PIMCO continues to negotiate with United on our holdings and currently leads an ad hoc committee. This has been an extremely complicated effort due to the
complex nature of United's bankruptcy. These negotiations have required PIMCO's analysts access to non-public infonnation and therefore sharing them results in
parties becoming restricted. In light of this extremely complicated bankruptcy, PIMCO continues to strive to act in the most prudent manner to obtain maximum
recovery.
Split Rated Securities Still In Compliance:
The District's investment policy requires a minimum rating of A3 by Moody's or A-by S&P, with at least a BBB in the event of a split rating.
$1, 750,000 par of Virginia Electric Power NT securities ( cusip 927804ENO), maturing on March 31, 2006, represents 0.59% of the portfolio holdings on a par basis.
The security was downgraded on 10/21/2002 by S&P from A-to BBB+, but continues to carry a Moody's rating of A3.
H:ldeptlfinl2201geggielF AHR\L-TOB00-05-08.RPT.doc
1
UQUID OPE~·PIMCO-OCSF07511102
Description
CASH & CASH EQUIVALENTS
U.S. DOLLAR
INTEREST
CERTIFICATES OF DEPOSIT -DOMESTIC
COMMERCIAL PAPER -DISCOUNT
FED HM LOAN BNK -LESS THAN IYR
FEDERAL HOME LOAN MORTGAGE -LESS THAN 1
FNMA ISSUES -LESS THAN 1 YR
MUTUAL FUNDS
REPURCHASE AGREEMENTS
TREASURY BILLS -LESS THAN 1 YR
FIXED INCOME SECURITIES
U.S. DOLLAR
BANKING & FINANCE
UTILITY -TELEPHONE
U.S. DOLLAR
CASH & CASH EQUIVALENTS
U.S. DOLLAR
FIXED INCOME SECURITIES
TOTAL ASSETS -BASE:
Asset Summary
by Asset Type with Sectors
8/31/2005
Cost
Shares Par Base
205,023.05
3,300,000.000 3,300,000.00
4,896,000.000 4,869,979.08
7 ,400.000.000 7,314,820.17
5, 700,000.000 5,623,056.22
9,900,000.000 9,766,506.91
136,406.840 136,406.84
3,200,000.000 3,200,000.00
2 ,800 ,000.000 2,768,820.59
37 ,332,406.840 37,184,612.86
37 ,332,406.840 37,184,612.86
1,090,000.000 1,101,975.20
1 ,000,000.000 1,007,520.00
2,090,000.000 2,109,495.20
2,090,000.000 2,109,495.20
39,422,406.840 39,294,108.06
1
Report ID: GL8251
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
Market Value
Base
%of
Total
Net Unrealized
Gain/Loss
Base
205,023.05 0.52% 0.00
3,300,000.00 8.40% 0.00
4,869,979.08 12.40% 0.00
7,314,820.17 18.62% 0.00
5,623,056.22 14.31% 0.00
9,766,506.91 24.86°/i, 0.00
136,406.84 0.35% 0.00
3,200,000.00 8.14% 0.00
2, 768,820.59 7.05% 0.00
37,184,612.86 94.64% 0.00
37,184,612.86 94.64% 0.00
l, l 00,535.20 2.80% -1,440.00
1,004,680.00 2.56% -2,840.00
2,105,215.20 5.36% -4,280.00
2,105,215.20 5.36% -4,280.00
39 ,289,828.06 100.00% -4,280.00
Workbench
LONG TERM OPER-PIMCO -OCSF075~?.202
Description
CASH & CASH EQUIVALENTS
U.S. DOLLAR
PENDING TRADES
INTEREST
FEDERAL HOME LOAN MORTGAGE -LESS THAN 1
MUTUAL FUNDS
U.S. DOLLAR
CASH & CASH EQUIVALENTS
FIXED INCOME SECURITIES
U.S. DOLLAR
ABS -AIRPLANE RECEIVABLES
ABS -HOME EQUITY
BANKING & FINANCE
COLLATERALIZED MORTGAGE OBLIGATION
FMLMC MULTICLASS
FHLMC POOLS
FNMA POOLS
GNMA MULTI FAMILY POOLS
GNMA SINGLE FAMILY POOLS
INDUSTRIAL
INFLATION INDEXED SECURITIES
PVT PLACEMENTS -MORE THN 1 YR
U.S. AGENCIES
U.S. GOVERNMENTS
UTILITY -ELECTRIC
U.S. DOLLAR
FIXED INCOME SECURITIES
TOTAL ASSETS • BASE:
Asset Summary
by Asset Type with Sectors
$/31/20()5
Cost
Shares Par Base
-56, 119,458.10
2,125,418.77
200,000.000 197,738.89
1,268,813.130 1,268,813.13
1,468,813.130 -52,527 ,487.31
1,468,813.130 -52,527 ,487.31
1,600,000.000 1,600,000.00
373,496.210 373,496.21
37,450,000.000 37,542,039.10
1, 146,403.330 1,146,403.33
702 '461. 040 703,209.39
50,405.730 49,177.08
55,601,008.140 56,293,084.63
2,799,937. 750 2,791,227.70
438,306.560 459,484.64
2,000,000.000 1,998, 188.00
25,586,461.540 26, l 32 ,396.4 7
752,000.000 826,199.84
25,291,478.740 24,871,544.92
189,594,342.070 188,696, 186.12
3, 150,000.000 3, 143,840.00
346,536,301.110 346,626,477.43
346,536,301.110 346,626,477.43
348,005, 114.240 294,098,990.12
1
Report ID: GL8251
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
St11t~s: FINA~
Market Value
Base
-56, 119,458.10
2,125,418.77
197,738.89
1,268,813.13
-52,527 ,487.31
-52,527,487.31
1,048,768.00
373,795.01
37,522, 103.49
1, 158, 922.05
701,519.74
52,012.16
56,070,639.77
2,828, 775.19
456,917.11
1,999,680.00
27, 146,264.92
826,199.84
24,986,939.44
188,618,325.64
3, 166, 173.50
346,957,035.86
346, 957 ,035.86
294,429,548.55
%of
Total
-19.06%
0.72%
0.07%
0.43%
-17.84%
-17.84%
0.36%
0.13%
12.74%
0.391Yo
0.24%
0.02%
19.04%
0.96%
0.16%
0.68%
9.22%
0.28%
8.49%
64.06%
1.08%
117.84%
117.84%
100.00%
Net Unrealized
Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
0.00
-551,232. 00
298.80
-19,935.61
12,518.72
-1,689.65
2,835.08
-222,444.86
37,547.49
-2,567.53
1,492.00
1,013,868.45
0.00
115,394.52
-77,860.48
22,333.50
330,558.43
330,558.43
330,558.43
Workbench
YLDANAL
OCSF075lll02
DISTRICT: LIQUID OPERATING
PAR VALUE
SECURITY ID SECURITY DESCRIPTION
CASH & CASH EQUIVALENTS
1,100,000.00 BANKAMERICA CORP DISC
0660POYM9 11/21/2005
l,Soo,000.00 CITIBANK NA NY BRH INSTL C/D
17304TXA6 3.720% 11/09/2005 DD 08/09/05
1,9001 000.00 DU PONT DE NEMOUR DISC
26354AWU4 09/28/2005
2,300,000.00 FEDERAL HOME LN BK CONS DISC
31338SLM6 MAT 9/9/2005
2,900 1000.00 FEDERAL HOME LN BR CONS DISC N
31338SND4 MAT 10/19/2005
1,9001 000.00 FEDERAL HOME LN BK CONS DISC
31338SSQO
3001 000.00 FEDERAL HOME LN BK CONS DISC N
313385TK2 MAT 02/22/2006
7001 000.00 FEDERAL HOME LN MTG CORP DISC
313397LJ8 MAT 09/06/2005
21 000,000.00 FEDERAL HOME LN MTG CORP DISC
313397LRO 0.000\ 09/13/2005 DD 09/13/04
2,000,000.00 FEDERAL HOME LN MTG CORP DISC
313397NS6 MAT 11/01/2005
1,1001 000.00 FEDERAL HOME LN MTG CORP DISC
313397NZO MAT 11/08/2005
1,900,000.00 FEDERAL HOME LN MTG CORP DISC
313397RQ6 MAT 01/10/2006
4,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT
313589NL3 MAT 10/26/2005
3,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT
313589QS5 MAT 12/19/2005
YIELD ANALYSIS
2005/08/31
YTM AT CURRENT MOODY MARKET
BOOK YIELD 5-P PRICE
.ooo .ooo
.ooo 3. 720
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
.ooo .ooo
P-l
P-1
A-1+
P-1
A-1+
P-1
A-1+
P-1
A-1+
P-1
A-1+
P-1
A-1+
P-1
A-1+
P-1
A-1+
P-1
A-1+
P-1
A-1+
P-1
A-1+
99.069
100.000
99.501
99.186
99.145
98.104
98.123
99 .194
99 .178
98.593
99.092
99.254
98.367
98.794
PAGE
RUN DATE
RUN TIME
TOTAL COST/
MARKET VAr..tJE
1,089,742.SO
1,089,742.SO
1,soo,000.00
1,500,000.00
1,890,525.33
1,890,525.33
2,281,279.28
2,281,279.28
2,875,193.72
2,875,193.72
1,863,979.17
1,863,979.17
294,368.00
294,368.00
694,355.47
694,355.47
1,983,569.44
1,983,569.44
1,971,865.00
1,971,865.00
1,090,015.03
1,090,015.03
1,866,820.72
1,866,820.72
3,934,682.22
3,934,682.22
2,963,827.50
2,963,827.50
1
09/06/05
15.20.46
% TYPE
\ TOTAL
2.94
2.79
4.05
3.84
s.11
4.84
6.16
5.84
1. 77
7.36
5.04
4. 77
• 79
• 75
1.87
1. 78
5.36 s.oe
5.33 s.os
2.94
2.79
S.04
4.78
10.64
10.07
8.01
7.58
... ,
YLDANAL
OCSF07511102
DISTRICTt LIQUID OPERATING
YIELD ANALYSIS
2005/08/31
PAGE
RUN DATE
RUN TIME
2
: 09/06/0S
15.20.46
============c=~=====~~=============~~==========~~~~=e:=====================================================c~=======c===~==
PAR VALUE YTM AT CURRENT MOODY MARRET
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE
900,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 98.270
313589SV6 MAT 02/08/2006 A-1+
1,896,000.00 GENERAL ELEC CAP DISC .000 .000 WR 99.668
36959HW94 09/09/2005
800,000.00 u s TREASURY BILL .ooo .ooo P-1 99.812
91279SVPJ 0.000% 09/01/2005 DD 03/03/05 A-1+
2,000,000.00 U S TREASURY BILL .ODO .000 P-1 98.516
912795VVO 10/13/2005 DD 04/14/2005 A-1+
1,800,000.00 WELLS FARGO BANK NA INSTL C/D
9497P2867 3.500% 09/06/2005 DD 08/12/05
3,200,000.00 CS FOB CAT 2 REPO REPO
99440F718 03.500% 09/01/2005 DD 08/31/05
136,406.84 DREYFUS TREASURY CASO MGMT
996085247
TOTAL CASH & CASH EQUIVALENTS
FIXED INCOHE SECURITIES
15,000.00 ASSOCIATES CORP NORTH AMER NT-
046003FH6 6.375% 11/15/2005 DD 11/21/95
75,000.00 BEAR STEARNS COS INC NTS
073902AU2 6.875% 10/01/2005 DD 10/05/95
soo,000.00 CIT GROUP INC GLOBAL SR NT
12SS77AN6 4.125% 02/21/2006 DD 02/20/03
500,000.00 HOUSEHOLD FIN CORP NT
441812FT6 7.250% 05/15/2006 DD 05/15/96
.ooo
.ooo
.ooo
.ooo
.ooo
.ooo
.ooo
.ooo
3.500
3.500
3.261
.380
6.346
6.861
4.122
7.109
AAA
AAA
AAl
AA-
Al
A
A2
A
Al
A
100.000
100.000
100.000
100.453
100.203
100.079
101.984
TOTAL COST/
MAR.KET VALUE
884,427.75
884,427.75
1,889,711.25
1,889,711.25
798,492.67
798, 492 .67
1,970,327.92
1,970,327.92
1,800,000.00
l,eoo,000.00
J,200,000.00
3,200,000.00
136,406.84
136,406.84
36,979,589.81
36,979,589.81
15,112.95
15,067.95
75,422.25
75,152.25
499,820.00
500,395.00
511,620.00
509,920.00
% TYPE
% TOTAL
2,39
2.26
5.11
4.83
2.15
2.04
S.32
5.04
4.86
4.61
8.65
8.19
.36
.35
100.00
94.64
.71
.04
3.56
.19
23.76
1.28
24.22
1.30
YLDANAL
OCSF07Slll02
DISTRICT: LIQUID OPERATING
PAR VALUE
SECURITY ID SECURITY DESCRIPTION
----------------------------------------------
1,000,000.00 SOUTHWESTERN BELL TEL co MED
94534EDS4 6.560% 11/15/2005 DD 11/15/96
TOTAL FIXED INCOME SECURITIES
TOTAL
YTM AT
BOOK -------
.ooo
--------.ooo
--------.ooo
YIELD ANALYSIS
2005/08/31
CURRENT MOODY
YIELD S-P --------------
6.529 A2
A
-------s. 777
-------.432
MARKET
PRICE --------
100.469
TOTAL
PAGE
RUN DATE
RUN TIME
COST/
MARKET VALUE
------------
1,001,s20.oo
1,004,690.00
-----------------2,109,495.20
2,1os,21s.20
-----------------39,089,095.01
39,084,805.01 ========c=:=:=====
3
09/06/05
I 15.20.46
' TYPE
% TOTAL
----------
47.72
2.57
---------100.00
S.39
---------100.00
100.00 =====z===
YLDANAL
OCSF07522202
DISTRICTr LONG-TERM OPERATING
YIELD ANALYSIS
2005/08/31
PAGE
RUN DATE
RUN TIME
4
09/06/05
15.20.46
=======c============================c==~~~~===============================================~==~e==~~~======================~~
PAR VALUE
SECURITY ID SECURITY DESCRIPTION
CASH & CASH EOUIVALENTS
200,000.00 FEDERAL HOME LN MTG CORP DISC
3133970KO MAT 12/12/2005
1,269,813.13 DREYFUS TREASURY CASH MGMT
996085247
TOTAL CASH & CASH EQUIVALENTS
FIXED IHCOME SECURITIES
752,000.00 AIG SUNAMERICA GLOBAL REG S
U00907AAO S.850% 08/01/2008 DD 08/08/01
600,000.00 CIT GROUP WC SR NT
125581AA6 7.375% 04/02/2007 DD 04/01/02
l,soo,000.00 CIT GROUP INC NEW SR NT
125581AF5 VAR RT 09/22/2006 DD 09/23/03
3,300,000.00 CIT GROUP INC M'IN fSR00092
12560PDVO VAR RT 05/23/2008 DD 05/25/05
1,600,000.00 CITIGROUP INC GLOBAL SR NT
172967CW9 VAR RT 05/02/2008 DD 05/02/05
10,000,000.00 FEDERAL HOME LN MTG CORP MTN
3128X3WY5 4.000% 09/22/2009 DD 09/22/04
2,700,000.00 FEDERAL HOME LN BKS CONS BD
3133X3SQ7 VAR RT 02/27/2012 DD 02/27/04
S0,405.73 FBLMC GROUP #78-6064
31348SWZ3 6.384% 01/01/2028 DD 12/01/97
2,350,000.00 FEDERAL NATL MTG ASSN DEBS
31359MJX2 5.250% 06/15/2006 DD 06/22/01
6,900,000.00 FEDERAL NATL MTG ASSN DEBS
31359MUQ4 3.125% 03/16/2009 DD 03/16/04
YTM AT CURRENT MOODY
BOOK YIELD S-P
.ooo .ooo
.ooo 3.261
.ooo 2.486
.ooo 5.325
.ooo 7.038
.ooo 3.830
.ooo 4.022
.ooo 3.751
.ooo 4.056
.ooo 8.840
.ooo 4.163
.ooo s.201
.ooo 3.233
P-1
A-1+
AAA
AAA
A2
A
A2
A
A2
A
AAl
AA-
AAA
AAA
AAA
AAA
AAA
AAA
AAA
AAA
AAA
AAA
MARKET
PRICE
98.869
100.000
109.867
104.783
100.359
100.265
99.968
98.630
93.893
103.187
100.934
96.671
TOTAL COST/
MARKET VALUE
197,738.89
197,738.89
1,268,813.13
1,268,813.13
1,466,552.02
1,466,552.02
826,199.84
826,199.84
632,688.00
628,698.49
1,so1,oos.oo
1,505,385.00
3,300,000.00
3,308,745.00
1,600,000.00
1,599,488.00
9,993,100.00
9,863,000.00
2,565,820.00
2,535,099.39
49,177.08
52,012.16
2,385,461.50
2,371,949.00
6,575,736.00
6,573,628.00
% TYPE
% TOTAL
13.48
.06
86.51
.36
100.00
.42
.23
.24
.18
.18
.43
.43
.95
.95
.46
.46
2.84
2.83
.73
.73
.01
.01
.68
.68
1.89
1.89
._ .... ,
YLDANAL YIELD ANALYSIS PAGE s
OCSF07522202 2005/08/31 RUN DATE 09/06/05
DISTRICT: LONG-TERM OPERATING RUN TIME 15.20.46
====================~==============~==~=;======~==~===~c~~=cec====n==c~zaz=========cc===================c=========~==========
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
565,477.12 FNMA POOL 10254510 .ooo 4.956 AAA 100.878 582,441.43 .16
31371KVB4 5.000% 11/01/2017 DD 10/01/02 AAA 570,442.01 .16
120, 889 .11 FNMA POOL #0254631 .ooo 4.957 AAA 100.877 124,515.79 .03
31371KY47 5.000% 02/01/2018 DD 01/01/03 AAA 121,949.31 .04
109,380.84 FNMA POOL 00254760 .ooo 4.957 AAA 100.867 112,662.26 .03
31371K5V9 5.000\ 06/01/2018 DD 05/01/03 AAA 110,329.17 ,OJ
50,028.39 FNMA POOL 00254866 .ooo 4.957 AAA 100.858 51,529.25 .01
31371LCB3 5.000% 09/01/2018 DD 08/01/03 AAA 501 457.63 .01
371,914.38 FNMA POOL f 0254907 .ooo 4.958 AAA 100.855 371,914.38 .10
31371LDLO 5.000% 10/01/2018 DD 09/01/03 AAA 375,094.25 .11
264,932.55 FNMA POOL 10254953 .ooo 4.958 AAA 100.852 268,327.0l .01
31371LE21 s.ooot 11/01/2018 DD 10/01/03 AAA 267,189.78 .os
709,776.45 FNMA POOL f 0254987 .ooo 4.963 AAA 100.751 719,870.46 .20
31371LF46 5.000% 12/01/2018 DD 11/01/03 AAA 715,108.57 .21
116,313.61 FNMA POOL f 0323980 .ooo 5.815 AAA 103.189 121,438.68 .03
31374T2MO 6.000\ 04/01/2014 DD 09/01/99 AAA 120,022.85 .03
20,214.37 FNMA POOL 10357328 .ooo 4.962 AAA 100.765 20,820.a1 .oo
31376J4M8 S.000% 01/01/2018 DD 01/01/03 AAA 20,368.98 .01
1,083,236.30 FNMA POOL 00357430 .ooo 4.957 AAA 100.864 1,095,422.70 .31
31376ltA71 5.000% 09/01/2018 DD 09/01/03 AAA 1,092,595.46 .31
34,640.12 FNMA POOL 00456482 .ooo 5.815 AAA 103.189 36,166.43 .01
31381CCT2 6.000% 02/01/2014 DD 02/01/99 AAA 35,744.79 .01
93,099.60 FNMA POOL 10509649 .ooo 5.815 AAA 103.189 97, 201. 80 .02
31383QEWO 6.000% 09/01/2014 DD 09/01/99 AAA 96,068.55 .03
90,844.86 FHMA POOL 10535451 .ooo S.815 AAA 103.189 94,847.72 .02
31384VZQ8 6.000% 06/01/2015 DD 07/01/00 AAA 93, 741.90 .03
260,929.06 FNMA POOL 10555363 .ooo 4.957 AAA 100.877 268,756.92 .07
3138SWSY1 s.ooot 04/01/2018 DD 03/01/03 AAA 263,217.41 .08
27,182.53 FNMA POOL 00555453 .ooo 4.957 AAA 100.874 27,530.81 .oo
31385XBW6 S.000% 05/01/2018 DD 04/01/03 AAA 27,420.11 .01
YLDANAL YIELD ANALYSIS PAGE 6
OCSF07522202 2005/08/31 RUN DATE 09/06/05
DISTRICTS LONG-TERM OPERATING RUN TIME 15.20.46
==c=====~~======c~===~======a~~=~===========c~=~=====~=~=======~e===~=~===~=~==~~~=m~~msD~mn~~=m============;=====ce~~=~cc==
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARRET VA!.UE % TOTAL
-------------------------------------------------------------------------------------------------
217,863.29 FNMA POOL 10555545 .ooo 4.957 AAA 100.874 224,399.20 .06
31385XES2 s.ooot 06/01/2018 DD OS/01/03 AAA 219,767.42 .06
748,138.21 FNMA POOL 10555621 .000 4.963 AAA 100.751 756,554.75 .21
31385XG68 S.000% 07/01/2018 DD 06/01/03 AAA 753,758.52 .22
415,158.21 FNMA POOL f 0681309 .ooo 4.957 AAA 100.877 427,612.95 .12
31391Y3S4 S.000% 02/01/2018 DD 02/01/03 AAA 418, 799 .15 .12
49,813.81 FNMA POOL f 0681334 .ooo 4.957 AAA 100.877 51,308.23 .01
31391Y4Tl S.000% 02/01/2018 DD 01/01/03 AAA 50,250.68 .01
307,106.05 FlUIA POOL 10684798 .ooo 5.430 AAA 101.283 30G,B42.14 .oe
31400DX31 5.500\ 03/01/2033 DD 03/01/03 AAA 311,046.22 .09
271,599.83 FNMA POOL 10684908 .ooo 4.957 AAA 100.867 275,079.73 .07
31400D3Rl 5.000% 06/01/2018 DD 05/01/03 AAA 273,954.60 .08
148,136.00 FNMA POOL 10685200 .ooo 4.957 AAA 100.874 150,034.01 .04
31400EGH7 5.oooi 0310112018 DD 03/01/03 AAA 149,430.71 .04
24,776.28 FNMA POOL f 0685665 .ooo 4.957 AAA 100.877 25,519.57 .oo
31400EW22 S.000% 02/01/2018 DD 02/01/03 AAA 24,993.57 .01
222,224.07 FNMA POOL f 0686318 .ooo 4.957 AAA 100.877 228,890.79 .06
31400FPB7 5.000% 03/01/2018 DD 03/01/03 AAA 224,172.98 .06
87,287.66 FNMA POOL 10688739 .ooo 4.957 AAA 100.867 89,906.29 .02
31400JEL9 S.000% 06/01/2018 DD 06/01/03 AAA 88,044.44 .03
80,252.04 FNMA POOL f 0689859 .ooo 4.957 AAA 100.867 81, 280. 27 .02
31400KMG8 S.000% 05/01/2018 DD 05/01/03 AAA 90,947.83 .02
463,287.86 FNMA POOL 00693834 .ooo 4.957 AAA 100.877 477,186.47 .13
31400PY74 5.000% 03/01/2018 DD 03/01/03 AAA 467,350.89 .13
172,619.39 FNMA POOL f 0695852 .ooo 4.957 AAA 100.871 177,797.97 .os
31400SBVO 5.000% 05/01/2018 DD 05/01/03 AAA 174,122.90 .os
616,008.71 FNMA POOL 10695889 .ooo 4.957 AAA 100.871 634,488.98 .11 31400SC23 5.000% 05/01/2018 DD 05/01/03 AAA 621,374.15 .18
18,459.81 FNMA POOL 10697026 .ooo 4.957 AAA 100.871 19, 013 .62 .oo 31400'l'LF2 s.oooi 05/01/2018 DD 04/01/03 AAA 18,620.59 .01
YLDANAL YIELD ANALYSIS PAGE 7
OCSF07522202 2005/08/31 RUN DATE 09/06/05
DISTRICT: LONG-TERM OPERATING RUN TIME 15.20.46
=~==~:===c=====~=====:==============c~e~==========c~==zc::c=~~===~=c~m=====;=:n~=====~==~=====;===~===~===========;======~===
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PR I CB MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
172,373.57 FNMA POOL 10702210 .ooo 4.963 AAA 100.751 177,544. 78 .os
31401ADP9 5.000% 05/01/2018 DD 05/01/03 AAA 173,668.51 .os
102,673.59 FNMA POOL 00702328 .ooo 4.957 AAA 100.871 103,989.09 .02
31401AHD2 5.000% 05/01/2018 DD 04/01/03 AAA 103,567.98 .03
226, 241. 69 FNMA POOL 10709148 .ooo 4.957 AAA 100.864 233,028.96 .06
31401HZM7 5.000% 06/01/2019 DD 06/01/03 AAA 228,196.42 .07
507,303.04 FNMA POOL 10709360 .ooo 4.957 AAA 100.864 513,802.86 .14
31401JB56 5.000% 07/01/2018 DD 06/01/03 AAA 511,686.14 .1s
86, 791.11 FNMA POOL f 0709926 .ooo 4.957 AAA 100.867 87,903.12 .02
31401JSP4 5.000% 06/01/2018 DD 06/01/03 AAA 87,543.59 .03
180,195.27 FNMA POOL f0709917 .ooo 4.957 AAA 100.867 182,504.03 .os
31401JVJ4 5.000% 06/01/2018 DD 06/01/03 AAA 181,757.56 .05
17,339.35 FNMA POOL f0709963 .ooo 4.963 AAA 100.751 17, 561. 52 .oo
31401JWYO 5.000% 06/01/2018 DD 06/01/03 AAA 17,469.61 .01
457,410.77 FNMA POOL f 0710235 .ooo 4.957 AAA 100.864 471,133.12 .13
31401KBC8 5.000% 06/01/2018 DD 06/01/03 AAA 461,362.80 .13
12,298.05 FNMA POOL 00713344 .000 4.957 AAA 100.867 12,666.98 .oo
31401NP52 5.000% 06/01/2018 DD 06/01/03 AAA 12,404.67 .oo
185,205.51 FNMA POOL 00713365 .ooo 4.957 AAA 100.864 187,578.44 ,OS
3140lNOSl S.000% 07/01/2018 DD 07/01/03 AAA 186,805.69 .os
567,852.00 FNMA POOL 10720319 .ooo 4.957 AAA 100.864 575,127.62 .16
31401WG45 S.000% 07/01/2018 DD 07/01/03 AAA 572,758.24 .16
1,863,075.32 FNMA POOL 10720369 .ooo 4.963 AAA 100.751 1,918,967.58 .54
31401WJNO S.000% 06/01/2018 DD 06/01/03 AAA 1, 877 I 071. 4 7 .54
244,114.15 FNMA POOL f 0721629 .ooo 4.957 AAA 100.864 251,437.59 .07
31401XVW4 5.000% 07/01/2018 DD 06/01/03 AAA 246,223.30 .07
183,258.86 FNMA POOL f 0723487 .ooo 4.957 AAA 100.864 185,320.54 .OS
31402AXQ4 5.000% 06/01/2018 DD 06/01/03 AAA 184,842.22 .os
2,800,138.83 FNMA POOL f 0725530 .ooo 4.965 AAA 100.708 2,838,203.20 .81
31402DA75 S.000% 06/01/2019 DD 05/01/04 AAA 2,819,962.58 .81
.. ;.::-···.· ...
YLDAHAL YIELD ANALYSIS PAGE 8
OCSF07522202 2005/08/31 RUN DATE 09/06/05
DISTRICT: LONG-TERM OPERATING RUN TIME 15.20.46
===================~========================================================~======~n=====~~~====~===:=~~====c=====~=========
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL -------------------------------------------------------------------------------------------------
328,216.81 mMA POOL f 0729601 .ooo 4.957 AAA 100.861 332,422.10 .09
31402HRW3 S.000% 07/01/2018 DD 07/01/03 AAA 331,042.76 .10
29,463.15 FNMA POOL f 0732873 .ooo 4.958 AAA 100.852 29,840.63 .oo
31402MFNS 5.000% 11/01/2018 DD 10/01/03 AAA 29,714.18 .01
948,496.66 FrlMA POOL 00735227 .ooo 5.437 AAA 101.163 956,499.60 .27
31402QYY1 5.500% 02/01/2035 DD 01/01/05 AAA 959,527.68 .28
soo,000.00 FNMA POOL 10735856 .ooo 4.965 AAA 100. 714 504,843.75 .14
31402RQB5 5.000% 08/01/2020 DD 09/01/05 AAA 503,568.58 .14
493,511.32 FNMA POOL 10737130 .ooo 4.957 AAA 100.858 499, 834. 43 .14
31402S4P9 5.000\ 10/01/2018 DD 10/01/03 AAA 497, 745.65 .14
430,603.67 FNMA POOL 10738211 .ooo 4.963 AAA 100.751 436,120.81 .12
31402UDQ2 5.000\ 10/01/2018 DD 10/01/03 AAA 433,838.53 .12
155,834.67 FNMA POOL 10738487 .ooo 4.958 AAA 100.852 157, 831.31 .04
31402UNC2 5.000% 10/01/2018 DD 10/01/03 AAA 157,162.38 .OS
1,821,344.71 FNMA POOL 10740457 .ooo 4.963 AAA 100.751 1,846,103.61 .52
31402WTN8 5.000% 10/01/2018 DD 10/01/03 AAA 1,835,027.36 .53
639 ,901. 38 FNMA POOL 10740471 .ooo 4.963 AAA 100.751 648,100.10 .18
31402WT40 S.000% 10/01/2018 DD 10/01/03 AAA 644,708.57 .19
635,866.93 FNMA POOL f 0740748 .ooo 4.957 AAA 100.s5e 644,013.97 .18
31402W5H7 S.000% 10/01/2018 DD 11/01/03 AAA 641,322.67 .18
30,253.60 FNMA POOL 10743868 .ooo 4.963 AAA 100.751 30,641.23 .oo
31403BMR1 5.000% 11/01/2018 DD 10/01/03 AAA 30,480.98 .01
862,789.85 FNMA POOL 10744008 .ooo 4.957 AAA 100.867 873, 844 .35 .25
31403BR54 5.000% 07/01/2019 DD 09/01/03 AAA 870,270.24 .25
133,033.44 FNMA POOL 10744316 .ooo 4.963 AAA 100.751 134,737.93 .03
31403B3Z4 S.000% 09/01/2018 DD 09/01/03 AAA 134,032.84 .04
248,201.55 FNMA POOL 10747914 .ooo 4.958 AAA 100.852 251,381.64 .07
31403F3XO 5.000% 11/01/2018 DD 11/01/03 AAA 250,316.23 .01
152,436.57 FNMA POOL 10748400 .ooo 4.963 AAA 100.751 154,389.67 .04 31403GNR9 5.000% 08/01/2018 DD 09/01/03 AAA 153, 581. 73 .04
···'.·, ... ,
YLDANAL YIELD ANALYSIS PAGE 9
OCSF07522202 2005/08/31 RUN DATE : 09/06/05
DISTRICT: LONG-TERM OPERATING RUN TIME l 15.20.46
===============c=========~==============~======~=~==occcc:c:======c~~=======;;====~~=~=====~===2==============================
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
810,328.86 FNMA POOL 00748899 .ooo 4.963 AAA 100.751 820, 711. 20 .23
31403G7LO 5.000% 12/01/2018 DD 11/01/03 AAA 816,416.37 • 23
1, 729,068.91 FNMA POOL 10750377 .ooo 4.963 AAA 100.751 1,751,222.60 .so
31403JUA2 S.000% 11/01/2018 DD 11/01/03 AAA 1,742,058.35 .so
1,464,503.02 F?IMA POOL 10750380 .ooo 4.963 AAA 100.751 1,483,266.98 .42
31403JUD6 S.000% 11/01/2018 DD 11/01/03 AAA 1,475,504.94 .42
138,541.52 FNMA POOL f0750445 .ooo 4.963 AAA 100.751 140,316.58 .04
31403JWE2 S.000% 11/01/2018 DD 11/01/03 AAA 139,582.30 .04
655,835.58 FNMA POOL 00751960 .ooo 4 • .963 AAA 100.7Sl 664,238.49 .19
31403LMH1 5.000% 12/01/2018 DD 11/01/03 AAA 660,762.47 .19
68S,625.9.9 FNMA POOL 00753425 .ooo 4.958 AAA 100. 848 693,553.53 .19
31403NA23 S.000\ 11/01/2018 DD 11/01/03 AAA 691,440.10 .20
486,046.52 FNMA POOL 00755165 .ooo 4.958 AAA 100.848 492,273.99 .14
3140306A3 5.000% 12/01/2018 DD 11/01/03 AAA 490,168.19 .14
812,438.38 FNMA POOL 00756372 .ooo 4.958 AAA 100.848 821, 832 .20 .23
31403SJR8 5.000% 11/01/2018 DD 11/01/03 AAA 819,327.96 .24
2,889,453.03 FNMA POOL 10784251 .ooo 4.960 AAA 100.814 2,928,731.54 .83
3140SBH46 5.000% 11/01/2019 DD 11/01/04 AAA 2,912,973.18 .84
824,878.23 FNMA POOL 10789670 .ooo 4.960 AAA 100.914 836,091.42 .23
3140SBJ'P4 5.000% 12/01/2019 DD 12/01/04 AAA 831,592.74 .24
824,840.24 FNMA POOL 00792432 .ooo 4.959 AAA 100.817 836,052.91 .23
3140SLLM.9 S.000% 10/01/2019 DD 10/01/04 AAA 831,579.18 .24
4,761,399.59 FNMA POOL 10792437 .ooo 4.959 AAA 100.817 4,761,39.9.59 1. 38
31405LLS6 S.000% 10/01/2019 DD 10/01/04 AAA 4,800,300.22 1.38
878,943.39 FNMA POOL 10794195 .ooo 4.960 AAA 100.814 990,891.54 .25 31405NKG9 5.000% 11/01/2019 DD 11/01/04 AAA 886,097.99 .25
2,986,752.53 FNMA POOL 10797160 .ooo 4.960 AAA 100.814 3,027,353.69 .86 31405RTR7 5.000% 12/01/2019 DD 12/01/04 AAA 3,011,064.70 .86
788,119.47 FNMA POOL 00797408 .ooo 4.960 AAA 100.814 798,832.97 .22
31405RJRS 5.000% 12/01/2019 I>D 12/01/04 AAA 794,534.76 .23
YLDANAL YIELD ANALYSIS PAGE 10
OCSF07522202 2005/08/31 RUN DATE 09/06/05
DISTRICT: LONG-TERM OPERATING RUN TIME 15.20.46
=====~=~==~oc:=====c========~~========;===~~=::=~=========~=========~==========================~===~=========;~===a=~===nc:c~
PAR VALUE YTM AT CURRENT MOODY HARJ<ET TOTAL COST/ % TYPE
SECURITY ID SECURirY DESCRIPTION BOOK YIELD S-P PR I CB MARRET VALUE % TOTAL -------------------------------------------------------------------------------------------------
777,201.62 FNMA POOL 10797414 .ooo 4.960 AAA 100.814 787,766.69 .22
31405R3X2 S.000\ 12/01/2019 DD 12/01/04 AAA 783,528.04 .22
355,801.98 FNMA POOL 00800370 .ooo 4.960 AAA 100.814 355,412.83 .10
31405VFK8 s.ooot i210112019 Do 11101/04 AAA 358,698.21 .10
301,489.09 FNMA POOL t0800998 .ooo S.437 AAA 101.158 301,230.01 .08
3140SV3F2 5.500% 11/01/2034 DD 11/01/04 AAA 304,980.33 .09
2,999,933.27 FNMA POOL #0803923 .ooo 4.960 AAA 100. 814 2,939,354.24 .84
31406AD41 S.000% 12/01/2019 DD 12/01/04 AAA 2,923,538.73 .84
2,911,907.67 FNMA POOL 10807711 .ooo 4.960 AAA 100.814 2,9Sl,491.41 .84
31406EKY9 5.000% 01/01/2020 DD 01/01/05 AAA 2,935,610.60 .84
331,646.41 FNMA POOL f 0808933 .ooo S.437 AAA 101.158 331,361.40 .09
31406FV24 5.500% 01/01/2035 DD 01/01/05 AAA 335,486.88 .10
316,781.44 FNMA POOL tOB09350 .ooo S.437 AAA 101.158 316,509.21 .09
31406GEX3 S.500% 12/01/2034 DD 01/01/05 AAA 320,449.77 .09
324,521.63 FNMA POOL tOB14930 .ooo 5.445 AAA 101.005 324,242.74 .09
31406HLK8 5.500\ 04/01/2035 DD 04/01/05 AAA 327,783.03 .09
323,498.40 FNMA POOL 00815923 .ooo 5.437 AAA 101.158 323,220.40 .09
31406PPG8 5.500% 03/01/2035 DD 03/01/05 AAA 327,244.51 .09
619,956.25 FNMA POOL 10816246 .ooo 4.960 AAA 100.814 619,278.17 .18
31406PZK8 5.000% 03/01/2020 DD 03/01/05 AAA 625,002.69 .18
324,277.05 FNMA POOL 10819566 .ooo 5.437 AAA 101.158 323,998.38 .09
31406TQT1 5.500\ 04/01/2035 DD 04/01/05 AAA 328,032.18 .09
329,597.67 FNMA POOL 00822731 .000 5.437 AAA 101.158 329,314.42 .09 31406XA85 5.500% 05/01/2035 DD 05/01/05 AAA 333,414.41 .10
331, 391. 41 FNMA POOL 00823232 .ooo 5.437 AAA 101.158 331,106.61 .09 31406XSVS 5.500% 06/01/2035 DD 05/01/05 AAA 335,228.92 .10
1,938,413.06 FNMA POOL 00823787 .ooo 4.960 AAA 100.814 1,936,292.91 .56
31406YF47 s.ooot 05/01/2020 DD 05/01/05 AAA l,954,191.74 .56
7,913.46 GNMA POOL 10421389 .ooo 6.233 AAA 104.285 8,305.43 .oo
36206UC23 6.500\ 04/15/2026 DD 04/01/96 AAA 8,252.55 .oo
YLDANAL YIELD ANALYSIS PAGE 11
OCSF07522202 2005/08/31 RUN DATE 09/06/05
DISTRICT: LONG-TERM OPERATING RUN TIME 15.20.46
===============--======================~==~=~:===~===----====~==============~=========~=a=====c:=======~=~===~~c======~=======~~
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD 5-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
11,947.31 GNMA POOL 00449851 .ooo 6.239 AAA 104.186 12,539.07 .oo
36208FWLO 6.500% 01/15/2028 DD 01/01/98 AAA 12,447.45 .oo
32,330.19 GNMA POOL J0466845 .ooo 6.234 AAA 104.260 33,931.55 .oo
36209BTA6 6.500% 06/15/2028 DD 06/01/98 AAA 33,707.46 .01
39,958.06 GNMA POOL f 0468052 .ooo 6.235 AAA 104.257 41,937.23 .01
36209CSM4 6.500% 07/15/2028 DD 07/01/98 AAA 41,659.07 .01
115,828.40 GNMA POOL 10476041 .ooo 6.234 AAA 104.260 121,384.56 .03
36209MZE7 6.500% 06/15/2028 DD 06/01/98 AAA 120,762.69 .03
119,126.89 GNMA POOL 10478626 ,000 6.235 AAA 104.243 124,841.26 .03
36209QVT9 6.500% 01/15/2029 DD 01/01/99 AAA 124, 181. 44 .04
28,454.20 GNMA POOL 10480598 .ooo 6.235 AAA 104.248 29I819,10 .oo
36209S3F6 6.500, 10/15/2028 DD 10/01/98 AAA 29,662.93 .01
s,eu.33 GNMA POOL 10512235 .ooo 6.237 AAA 104.214 6 ,099 .17 .oo
36211GBC6 6.500% 11/15/2029 DD 11/01/99 AAA 6,056.22 .oo
76,936.72 GNMA POOL 10514326 .ooo 6.237 AAA 104.225 B0,627.27 .02
36211JLF2 6.500% 07/15/2029 DD 07/01/99 AAA 80,187.30 .02
137,509.15 GNMA II POOL f 0080395 .000 4.321 AAA 101.255 136,262.98 .04
36225CNM4 VAR RT 04/20/2030 DD 04/01/00 AAA 139,234.89 .04
1,221,758.77 GNMA II POOL I080408X .ooo 4.321 AAA 101.253 1,209,350.28 .35
3622SCN29 VAR RT 05/20/2030 DD 05/01/00 AAA 1, 2 3 7 , 06 7 • 41 .36
1,149,886.72 GNMA II POOL f0080965 .ooo 3.476 AAA 100.693 1, 149 f 168 I 03 .33
3622SDCB8 VAR RT 07/20/2034 DD 07/01/04 AAA 1,157,855.43 .33
6,soo,000.00 GENERAL ELEC CO NT .ooo 3.701 AAA 99.984 6,502,203.50 1.87
369604AZ6 VAR RT 10/24/2005 DD 10/24/03 AAA 6,498,960.00 1.87
2,000,000.00 GOLDMAN SACHS GRP MTN fTR00203 .ooo 3.587 AA3 100.078 2,001,900.00 .57
38141EJL4 VAR RT 03/30/2007 DD 04/01/04 A+ 2,001,560.00 .57
800,000.00 GOLDMAN SACHS GRP MTN tTR00207 .ooo 3.960 AA3 100.515 aoo,000.00 .23
38141EJ03 VAR RT 07/23/2009 DD 07/23/04 A+ 804,120.00 .23
4,250,000.00 GOLDMAN SACHS GRP .ooo 3. 770 AA3 100.218 4,250,000.00 1.22 38143UBD2 VAR RT 06/28/2010 DD 06/28/05 A+ 4,259,265.00 1.22
YLDANAL YIELD ANALYSIS PAGE 12
OCSF07522202 2005/08/31 RUN DATE 09/06/05
DISTRICT: I,ONG-TERM OPERATING RUN TIME 15.20.46
=:~===========c===========~==e=~=======~~==============~c==~==~~======~==============================================e~=====
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
2so,ooo.oo HSBC BK USA MTN f SR00012 .ooo 3.505 AA2 100 .125 250,170.00 .07
4042QOAH1 VAR RT 09/21/2007 DD 09/21/04 AA-250,312.SO .07
l,000,000.00 HSBC FIN CORP MTN t TR 00002 .ooo 3.898 Al 100.046 J,000,000.00 .86
40429JAB3 VAR RT 02/28/2007 DD 03/29/05 A 3,001,380.00 .86
3,000,000.00 HSBC FIN CORP MTN f TR 00007 .000 4.011 Al 99.984 2,995,830.00 .96
40429JAG2 VAR RT 05/10/2010 DD 05/10/05 A 2,999,520.00 .86
2,soo,000.00 HOUSEHOLD FIN CORP NT .ooo 7.035 A2 102.343 2,591,500.00 .73
441812GH1 7.200% 07/15/2006 DD 07/15/99 A 2,SSS,575.00 .73
2,000,000.00 MORGAN STANLEY .ooo 3.698 AA3 100.062 2,002,980.00 .57
61746BAK2 VAR RT 01/12/2007 DD 01/13/04 A+ 2,001,240.00 .57
J,200,000.00 MORGAN STANLEY NT .ooo 3.937 AA3 98.437 3,149,248.00 .90
61746BALO 3.875% 01/15/2009 DD 01/13/04 A+ 3,149,984.00 .90
650,000.00 MORGAN S'l'ANLEY NT .ooo 3.809 AA3 100.031 650,000.00 .19
61746SAZ2 VAR RT 11/09/2006 DD 11/12/04 A+ 650, 201.50 .19
1,400,000.00 PUBLIC SVC ELEC & GAS CO lST .ooo 3.577 A3 99.984 1,400,000.00 .40
744567FN3 VAR RT 06/23/2006 DD 06/25/04 A-1,399,776.00 .40
373,496.21 RESIDENTIAL ASSET 03-RSll AIIB .ooo 3.968 AAA 100.080 373,496.21 .10
7609851<83 VAR RT 12/25/2033 DD 12/30/03 AAA 373,795.0l .11
2,300,000.00 SALOMotl SMITH MTN t SR 00206 .ooo 3.935 AAl 100.203 2,308,514.60 .66
79548EJP8 VAR RT 05/18/2007 DD 05/28/02 2,304,669.00 .66
2,774,342.07 SBA GTD DEV PARTN 2001-2oc 1 .ooo 5.920 AAA 107.095 2,774,342.07 .es
83162CLJO 6.340% 03/01/2021 AAA 2,971, 181.64 .es
1,146,403.33 SBA GTD PARTN CTFS SBIC-PS 01 .ooo 6.568 AAA 101.092 1,146,403.33 .33
831641DD4 6.640% 02/10/2011 DD 02/21/01 HR 1,1581922.0S .33
2,000,000.00 TOYOTA MTR CR MTN ITR00413 .ooo 3.529 AAA 99.984 1,998,188.00 .57 89233PTE6 VAR RT 09/18/2006 DD 03/16/05 AAA 1,999,680.00 .57
1,600,000.00 UNITED AIRLS PASSTBRU 01-1 C .ooo 10.421 WR 65.548 1,600,000.00 .30 909317BC2 6.831% 03/01/2010 DD 08/22/01 A-1,048,768.00 .30
2,528,211.00 US TREASURY INFLATION INDEX NT .ooo 3.417 AAA 106.094 2,743,408,60 .11 9128273T7 3.625% 01/15/2008 DD 01/15/98 AAA 2,682,280.18 .77
•· '•i
YLDANAL YIELD ANALYSIS PAGE 13
OCSF07522202 2005/08/31 RUN DATE 09/06/05
DISTRICT: LONG-TERM OPERATING RUN TIME 15.20.46
=~=====~====~==================~=~cm~c=~=============~=~~===========c~~=======~===============================================
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARI<ET VALUE % TOTAL -------------------------------------------------------------------------------------------------
11,266,620.00 US TREASURY INFLATION INDEX NT .ooo 3.563 AAA 108.750 12,446,596.76 3.53
9128274Y5 3.875% 01/15/2009 DD 01/15/99 AAA 12,252,449.25 3.52
3,900,000.00 U S TREASURY NOTES .ooo 5.723 AAA 100.469 4,193,993.62 1.12
9128276N7 05.750% 11/15/2005 DD 11/15/00 AAA 3,918,291.00 1.12
2,100,000.00 U S TREASURY NOTES .ooo 4.175 AAA 101. 797 2,102,478.74 .61
912828BH2 4.250% 08/15/2013 DD 08/15/03 AAA 2,137,737.00 .61
10,900,000.00 U S TREASURY NOTES .ooo 3.423 AAA 98.590 10,644,845.28 3.09
91282BBT6 3.375% 12/15/2008 DD 12/lS/03 AAA l0,746,310.00 3.08
105,262.00 US TREASURY INFLATION INDEXED .ooo 1.939 AAA 103.120 107,467.37 .03
912828BW9 2.000% 01/15/2014 DD 01/15/04 AAA 108,546.17 .03
12,500,000.00 U S TREASURY NOTES .ooo 2. 772 AAA 99.190 12,483,394.83 3.57
912B28CMO 2.750% 06/30/2006 DD 06/30/04 AAA 12,398,750.00 3.56
3,198,673.00 US TREASURY INFLATION INDEX NT .ooo 1.937 AAA 103.240 3,286,540.88 .95
912828CP3 2.000% 07/15/2014 DD 07/lS/04 AAA 3,302,310.01 .95
14,000,000.00 U S TREASURY NOTES .ooo 2. 775 AAA 99.100 14,029,693.55 3.99
91282SCQ1 2.750% 07/31/2006 DD 07/31/04 AAA 13,974,000.00 3.98
35,300,000.00 U S TREASURY NOTES .ooo 2.407 AAA 98.660 35,120,197.62 10.03
912828CU2 2.375\ 08/31/2006 DD 08/31/04 AAA 34,826,980.00 10.00
20,000,000.00 U S TREASURY NOTES .ooo 2.907 AAA 98.900 20,640,268.90 5.92
912828DD9 2.875% 11/30/2006 DD 11/30/04 AAA 20,s11,200.oo S.90
13,920,000.00 U S TREASURY NOTES .ooo 3.549 AAA 98.630 13,733,493.75 3,95
912828DE7 3.500% 12/15/2009 DD 12/15/04 AAA 13,729,296.00 3,94
31,200,000.00 U S TREASURY NOTES .ooo 3,977 AAA 100.590 31,051,201.06 9.04
912828DP2 4.000% 03/15/2010 DD 03/15/05 AAA 31,384,080.00 9.01
11,200,000.00 U S TREASURY ROTES .ooo 3.754 AAA 99.900 ll,166,717.52 3.22 912828DQO 3.750% 03/31/2007 DD 03/31/05 AAA 11,1ee,aoo.oo 3.21
11,000,000.00 U S TREASURY NOTES .ooo 3.519 AAA 99.470 10,902,179.20 3.15 912828DW7 3.500\ 05/31/2007 DD 05/31/05 AAA 10,941,700.00 3.14
20,000,000.00 U S TREASURY NOTES .ooo 3.638 AAA 99.650 19,853,379.98 5,74
912828DY3 3.625% 06/30/2007 DD 06/30/05 AAA 19,930,000.00 S.72
···.-'.-.····.
YLDAllAL
OCSF07522202
DISTRICTS LONG-TERM OPERATING
PAR VALUE
SECURITY ID SECURITY DESCRIPTION
----------------------------------------------
1,1so,ooo.oo VIRGINIA ELEC & PWR 01 SER A
927804BNO 5.750% 03/31/2006 DD 03/27/01
8,487,695.54 US TREASURY INFLATION INDEX NT
9128272M3 3.375% 01/15/2007 DD 01/15/97
702,461.04 FBLMC MULTICLASS MTG SER E3 A
3133TCE95 VAR RT 08/15/2032 DD 12/01/97
412,129.02 GNMA GTO REMIC TR 2000-9 FH 3B37H4NX9 VAR RT 02/16/2030
159,476.43 GNMA II POOL f080088M
36225CC20 7.375% 06/20/2027 DD 06/01/97
131,306.68 GNMA II POOL t0080023
36225CAZ9 VAR RT 12/20/2026 DD 12/01/96
2,100,000.00 FEDERAL NATL MTG ASSN DEBS
31359MEY5 6.625% 09/15/2009 DD 09/01/99
929,349.72 WMP/HUNTOON PAIGE f 000-11150 302998GE3 7.500% 12/01/2030 DD 10/21/99
TOTAL FIXED INCOME SECURITIES
TOTAL
YTM AT
BOOK -------
.ooo
3.817
6.316
6.320
6.705
6.992
7.113
7.684
--------.024
--------.024
YIELD ANALYSIS
2005/0B/31
CURRENT MOODY
YIELD S-P --------------
S.697 A3
BBB+
3.255 AAA
AAA
4.191 AAA
AAA
4 .045 AAA
AAA
4.325 AAA
AAA
4.064 AAA
AAA
6.072 AAA
AAA
7.438 AAA
MA
-------4.367
-------4.367
MARKET
PR I CB --------
100.937
103.688
99.866
100.676
101.166
101.504
109.110
100.827
PAGE
RUN DATE
RUN THIE
TOTAL COST/
MARKET VALUE
------------
1,743,840.00
1,766,397.50
7,548,382.86
8,800,679.31
703,209.39
701,519.74
412,129.02
414,915.0l
162,964.97
161,335.93
133,481.44
133,281.53
2,030,133.00
2,291,310.00
909' 165. 40
937,038.04
-----------------346,626,477.43
346,957,035.86
-----------------348,093,029.45
349,423,587.88
====~====;=====~=
14
09/06/0S
15.20.46
% TYPE
% TOTAL
----------
.so
.51
2.53
2.53
.20
.20
.11
.12
.04
.05
.03
.04
.66
.66
.27
.21
---------100.00
99.56
---------100.00
100.00
==:=:~======
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
Net Unrealized
Price Cost Market Value %of Gain/Loss
Description Base Shares Par Base Base Total Base
U.S. DOLLAR
CASH & CASH EQUIVALENTS
INTEREST RECEIVABLE 2 ,330,441.82 2,330,441.82 0.70% 0.00
RECEIVABLE FOR INVESTMENTS 19,735,715.29 19,735,715.29 5.91% 0.00
SOLD
PAYABLE FOR INVESTMENTS -75,855, l 73.39 . 75,855, 173.39 -22.73% 0.00
PURCHASED
BANKAMERICA CORP 99.0675 l, 100,000.000 1,089, 742.50 1,089, 742.50 0.33% 0.00
DISC 11 /21 /2005SEC ID:
0660POYM9
CITIBANK NA NY BRH INSTL C/D 3. 100.0000 1,500,000.000 1,500,000.00 1,500,000.00 0.45% 0.00
720% 11/09/2005 DD
08/09/05SECID: 17304TXA6
DU PONT DE NEMOUR 99.5013 1,900,000.000 1,890,525.33 1,890,525.33 0.57% 0.00
DISC09/28/2005SEC ID:
26354AWU4
FEDERAL HOME LN BK CONS 99.1861 2,300,000.000 2 ,281,279 .28 2 ,281,279.28 0.68% 0.00
DISCMAT 9/9/2005SEC ID:
313385LM6
FEDERAL HOME LN BK CONS DISC 99.1446 2,900,000.000 2,875,193.72 2,875,193.72 0.86% 0.00
NMAT 10/ 19/2005SEC ID:
313385ND4
FEDERAL HOME LN BK CONS 98.1042 1,900,000.000 1,863,979.17 1,863,979.17 0.56% 0.00
DISCSEC ID: 313385SQO
FEDERAL HOME LN BK CONS DISC 98.1227 300,000.000 294,368.00 294,368.00 0.09% 0.00
NMAT 02/22/2006SEC ID:
313385TK2
FEDERAL HOME LN MTG CORP 99.1936 700,000.000 694,355.47 694,355.47 0.21% 0.00
DISCMAT 09/06/2005SEC ID:
313397W8
FEDERAL HOME LN MTG CORP DISC 99.1785 2,000,000.000 1,983,569.44 1,983,569.44 0.59% 0.00
0.000% 09/ 13/2005 DD
09/13/04SECID:313397LRO
FEDERAL HOME LN MTG CORP 98.5933 2,000,000.000 1,971,865.00 1,971,865.00 0.59% 0.00
DISCMAT 11/0l/2005SEC ID:
313397NS6
FEDERAL HOME LN MTG CORP 99.0923 1, 100,000.000 1,090,015.03 1,090,015.03 0.33% 0.00
DISCMAT l 1/08/2005SEC ID:
313397NZO
1 Workbe11c11
I
Report ID: GL8013 I Asset Detail I I Base Currency: USD
I OCSD-CONSOUDATED -OCSGOOOlOOOO
by Currency Alternate Base Currency:
Exchange Rate: 8/31/2005 Status: FINAL
Net Unrealized
Price Cost Market Value %of Gain/Loss Description Base Shares Par Base Base Total Base
FEDERAL HOME LN MTG CORP 98.8694 200,000.000 197,738.89 197,738.89 0.06% 0.00
DISCMAT 12/ 12/2005SEC ID:
313397QKO
FEDERAL HOME LN MTG CORP 98.2537 1,900,000.000 1,866,820. 72 1,866,820. 72 0.56% 0.00
DISCMAT Ol/ 10/2006SEC ID:
313397RQ6
FEDERAL NATL MTG ASSN 98.3671 4,000,000.000 3,934,682.22 3,934,682.22 1.18% 0.00
DISCOUNTMAT 10/26/2005SEC
ID: 313589NL3
FEDERAL NATL MTG ASSN 98.7943 3,000,000.000
DISCOUNTMAT 12/ 19/2005SEC
2,963,827.50 2,963,827.50 0.89% 0.00
ID: 313589QS5
FEDERAL NATL MTG ASSN 98.2698 900,000.000 884.427.75 884,427.75 0.27% 0.00
DISCOUNTMAT 02/08/2006SEC
ID: 313589SV6
GENERAL ELEC CAP 99.6683 1,896,000.000 1,889,711.25 1,889,711.25 0.57% 0.00
DISC09/09/2005SEC ID:
36959HW94
US TREASURY BILL 0.000% 99.8116 800,000.000
09/01/2005 DD 03/03/05SEC ID:
798,492.67 798,492.67 0.24% 0.00
912795VP3
US TREASURY BILLl0/ 13/2005 98.5164 2,000,000.000
DD 04/ 14/2005SEC ID: 912795VVO
1, 970,327. 92 1,970,327.92 0.59% 0.00
WELLS FARGO BANK NA INSTL C/D 100.0000 1,800,000.000 1,800,000.00 1,800,000.00 0.54% 0.00
3.500% 09/06/2005 DD
08/12/05SECID:9497P2H67
CS FOB CAT 2 REPO REP003.500% 100.0000 3,200,000.000 3,200,000.00 3,200,000.00 0.96% 0.00
09/01/2005 DD 08/31/05SEC ID:
99440F718
DREYFUS TREASURY CASH 100.0000 1,405,219.970 1,405,219.97 1,405,219.97 0.42% 0.00
MGMTSEC ID: 996085247
TOTAL CASH & CASH EQUIVALENTS 38,801,219.970 -15,342,874.45 -15,342,874.45 -4.60% o.oo
FIXED INCOME SECURITIES
AIG SUNAMERICA GLOBAL REG S 5. 109.8670 752,000.000 826,199.84 826,199.84 0.25% 0.00
850% 08/01/2008 DD
08/08/01SECID:U00907AAO
ASSOCIATES CORP NORTH AMER NT-100.4530 15,000.000 15, 112.95 15,067.95 0.00% -45.00
6.375% 11/ 15/2005 DD
l 1/21/95SEC ID: 046003FM6
2 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
I by Currency Alternate Base Currency:
Exchange Rate:
: OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
·-----··-Net Unrealized
Price Cost Market Value %of Gain/Loss
1 Description Base Shares Par Base Base Total Base
BEAR STEARNS COS INC NTS6. 100.2030 75,000.000 75,422.25 75,152.25 0.02% -270.00
875% 10/01/2005 DD
10/05/95SECID:073902AU2
CIT GROUP INC GLOBAL SR NT4. 100.0790 500,000.000 499,820.00 500,395.00 0.15% 575.00
125% 02/21/2006 DD
02/20/03SECID: 125577AN6
CIT GROUP INC SR NT 7.375% 104.7831 600,000.000 632,688.00 628,698.49 0.19% -3,989.51
04/02/2007 DD 04/0l/02SEC ID:
125581M6
CIT GROUP INC NEW SR NTVAR RT 100.3590 1,500,000.000 1,507,005.00 1,505,385.00 0.45% -1,620.00
09/22/2006 DD 09/23/03SEC ID:
125581AF5
CIT GROUP INC MTN #SR00092VAR 100.2650 3,300,000.000 3,300,000.00 3,308, 745.00 0.99% 8,745.00
RT 05/23/2008 DD 05/25/0SSEC
ID: l 2560PDVO
CITIGROUP INC GLOBAL SR NTVAR 99.9680 1,600,000.000 1,600,000.00 1,599,488.00 0.48% -512.00
RT 05/02/2008 DD 05/02/0SSEC
ID: 172967CW9
WMP/HUNTOON PAIGE #000-100.8273 929,349. 720 909,165.40 937,038.04 0.28% 27,872.64
111507.500% 12/01/2030 DD
10/21/99SECID:302998GE3
FEDERAL HOME LN MTG CORP MTN 98.6300 10,000,000.000 9,993, 100.00 9 ,863 ,000.00 2.96% -130,100.00
4.000% 09/22/2009 DD
09/22/04SEC ID: 3128X3WY5
FHLMC MULTICLASS MTG SER E3 99.8660 702,461.040 703,209.39 701,519.74 0.21% -1,689.65
AVAR RT 08/15/2032 DD
12/01/97SECID:3133TCE95
FEDERAL HOME LN BKS CONS 93.8926 2,700,000.000 2,565,820.00 2.535,099.39 0.76% -30,720.61
BDVAR RT 02/27/2012 DD
02/27/04SECID:3133X3SQ7
FHLMC GROUP #78-6064 6.384% 103.1870 50,405.730 49,177.08 52,012.16 0.02% 2,835.08
01/01/2028 DD 12/01/97SEC ID:
31348SWZ3
FEDERAL NATL MTG ASSN DEBS6. 109.1100 2, 100,000.000 2,030, 133.00 2,291,310.00 0.69'Yo 261,177.00
625% 09/ 15/2009 DD
09/01/99SEC ID: 31359MEY5
FEDERAL NATL MTG ASSN DEBS5. 100.9340 2,350,000.000 2,385,461.50 2,371,949.00 0.71% -13,512.50
250% 06/15/2006 DD
06/22/01SECID:31359MJX2
3 Workbench
I
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
I Exchange Rate:
I OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
Net Unrealized
Price Cost Market Value %of Gain/Loss
Description Base Shares Par Base Base Total Base
FEDERAL NATL MTG ASSN DEBS 3. 96.6710 6,800,000.000 6,57 5, 736.00 6,573,628.00 1.97% -2,108.00
125% 03/ 16/2009 DD
03/ 16/04SEC ID: 31359MUQ4
FNMA POOL #0254510 5.000% 100.8780 565,477.120 582,441.43 570,442.01 0.17% -11,999.42
11 /01/2017 DD 10/01/02SEC ID:
31371KVB4
FNMA POOL #0254631 5.000% 100.8770 120,889.110 124,515.79 121,949.31 0.04% -2,566.48
02/01/2018 DD 01/01/03SEC ID:
31371KY47
FNMA POOL #0254760 5.000% 100.8670 109,380.840 112,662.26 110,329.17 0.03% -2,333.09
06/01/2018 DD 05/01/03SEC ID:
31371K5V9
FNMA POOL #0254866 5.000% 100.8580 50,028.390 51,529.25 50,457.63 0.02% -1,071.62
09/01/2018 DD 08/0l/03SEC ID:
31371LCB3
FNMA POOL #0254907 5.000% 100.8550 371,914.380 371,914.38 375,094.25 0.11% 3,179.87
10/01/2018 DD 09/01/03SEC ID:
31371LDLO
FNMA POOL #0254953 5.000% 100.8520 264,932.550 268,327.01 267,189.78 0.08°.1., -1,137.23
11/01/2018 DD 10/0l/03SEC ID:
31371LE21
FNMA POOL #0254987 5.000% 100.7512 709,776.450 718,870.46 715,108.57 0.21% -3,761.89
12/01/2018 DD l 1/0l/03SEC ID:
31371LF46
FNMA POOL #0323980 6.000% 103.1890 116,313.610 121,43~.68 120,022.85 0.04% -1,415.83
04/01/2014 DD 09/0l/99SEC ID:
31374T2MO
FNMA POOL #0357328 5.000% 100.7649 20,214.370 20,820.81 20,368.98 0.01% -451.83
01/01/2018 DD 01/0l/03SEC ID:
31376J4M8
FNMA POOL #0357430 5.0001% 100.8640 1,083,236.300 1,095,422. 70 1,092,595.46 0.33% -2,827.24
09/01/2018 DD 09/01/0JSEC ID:
31376KA71
FNMA POOL #0456482 6.000% 103.1890 34,640.120 36, 166.43 35,744.79 0.01% -421.64
02/01/2014 DD 02/0l/99SEC ID:
31381CCT2
FNMA POOL #0509649 6.000% 103.1890 93,099.600
09/01/2014 DD 09/01/99SEC ID:
97,201.80 96,068.55 0.03% -1, 133.25
31383QEWO
4 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
----·-Net Unrealized
Price Cost Market Value %of Gain/Loss
Description Base Shares Par Base Base Total Base
FNMA POOL #0535451 6.000% 103.1890 90,844.860 94,847.72 93,741.90 0.03% -1, 105.82
06/01/2015 DD 07/01/00SEC ID:
31384VZQ8
FNMA POOL #0555363 5.0001Yo 100.8770 260,929.060 268,756.92 263,217.41 0.08% -5,539.51
04/01/2018 DD 03/01/03SEC ID:
31385W5Yl
FNMA POOL #0555453 5.000% 100.8740 27,182.530 27,530.81 27,420.11 0.011!10 -110.70
05/01/2018 DD 04/0l/03SEC ID:
31385XBW6
FNMA POOL #0555545 5.000'!-'o 100.8740 21 7 .863.290 224,399.20 219,767.42 0.07% -4,631.78
06/01/2018 DD 05/0l/03SEC ID:
31385XES2
FNMA POOL #0555621 5.000% 100.7512 748,138.210 756,554.75 753,758.52 0.23% -2,796.23
07 /01/2018 DD 06/0l/03SEC ID:
31385XG68
FNMA POOL #0681309 5.000% 100.8770 415,158.210 427,612.95 418,799.15 0.13% -8,813.80
02/01/2018 DD 02/01/03SEC ID:
31391Y3S4
FNMA POOL #0681334 5.0001llo 100.8770 49,813.810 51,308.23 50,250.68 0.02% -1,057.55
02/01/2018 DD Ol/01/03SEC ID:
31391Y4Tl
FNMA POOL #0684 798 5.500% 101.2830 307, 106.050 306,842.14 311,046.22 0.09% 4,204.08
03/01/2033 DD 03/0l/03SEC ID:
31400DX31
FNMA POOL #0684908 5.000% 100.8670 271,599.830 275,079.73 273,954.60 0.08% -1,125.13
06/01/2018 DD 05/0l/03SEC ID:
31400D3Rl
FNMA POOL #0685200 5.000% 100.8740 148,136.000 150,034.01 149,430.71 0.04% -603.30
03/01/2018 DD 03/0l/03SEC ID:
31400EGH7
FNMA POOL #0685665 5.000% 100.8770 24,776.280 25,519.57 24,993.57 0.01% -526.00
02/01/2018 DD 02/0l/03SEC ID:
31400EW22
FNMA POOL #0686318 5.000% 100.8770 222,224.070 228,890.79 224,172.98 0.07% -4,717.81
03/01/2018 DD 03/01/03SEC ID:
31400FPB7
FNMA POOL #0688739 5.000% 100.8670 87,287.660 89,906.29 88,044.44 0.03% -1,861.85
06/01/2018 DD 06/01/03SEC ID:
31400JEL9
5 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
! OCSD·CONSOUDATED • OCSGOOOlOOOO
by Currency Alternate Base Currency:
Exchange Rate: 8/31/2005 Status: FINAL
·--·--·-Net Unrealized
Price Cost Market Value %of Gain/Loss Description Base Shares Par Base Base Total Base
FNMA POOL #0689859 5_000% 100.8670 80,252.040 81,280.27 80,947.83 0.02% -332.44
05/01/2018 DD 05/01/03SEC ID:
31400KMG8
FNMA POOL #0693834 5.000% 100.8770 463,287.860 477,186.47 467,350.89 o.14°1c, -9,835.58
03/01/2018 DD 03/01/03SEC ID:
31400PY74
FNMA POOL #0695852 5.000% 100.8710 172,619.390 177,797.97 174,122.90 0.05% -3,675.07
05/01/2018 DD 05/01/03SEC ID:
31400SBVO
FNMA POOL #0695889 5.000% 100.8710 616.008.710 634,488.98 621,374.15 0.19% -13,114.83
05/01/2018 DD 05/01/03SEC ID:
31400SC23
FNMA POOL #0697026 5.000% 100.8710 18,459.810 19,013.62 18,620.59 0.01% -393.03
05/01/2018 DD 04/0l/03SEC ID:
31400TLF2
FNMA POOL #0702210 5.000% 100.7512 172,373.570
05/01/2018 DD 05/01/03SEC ID:
177,544.78 173,668.51 0.05% -3,876.27
31401ADP9
FNMA POOL #0702328 5.000'Yo 100.8710 102,673.590
05/01/2018 DD 04/01/03SEC ID:
103,989.09 103,567.88 0.03% -421.21
31401AHD2
FNMA POOL #0709148 5.000% 100.8640 226,241.690 233,028.96 228,196.42 0.07% -4,832.54
06/01/2018 DD 06/01/03SEC ID:
31401HZM7
FNMA POOL #0709360 5.000% 100.8640 507 ,303.040 513,802.86 511,686.14 0.15% -2, 116.72
07 /01/2018 DD 06/0l/03SEC ID:
31401JB56
FNMA POOL #0709826 5.000% 100.8670 86,791.110 87,903.12 87,543.59 0.03% -359.53
06/01/2018 DD 06/01/03SEC ID:
31401JSP4
FNMA POOL #0709917 5.000% 100.8670 180, 195.270 182,504.03 181,757.56 0.05% -746.47
06/01/2018 DD 06/01/03SEC ID:
31401JVJ4
FNMA POOL #0709963 5.000% 100. 7512 17,339.350
06/01/2018 DD 06/01/03SEC ID:
17,561.52 17,469.61 0.01% -91.91
31401JWYO
FNMA POOL #0710235 5.000% 100.8640 457,410.770 471,133.12 461,362.80 0.14% -9,770.32
06/01/2018 DD 06/0l/03SEC ID:
31401KBC8
6 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
I OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Exchange Rate:
Status: FINAL
·-·--------.-~-~----Net Unrealized
Price Cost Market Value %of Gain/Loss
Description Base Shares Par Base Base Total Base
FNMA POOL #0713344 5.000% 100.8670 12,298.050 12,666.98 12,404.67 0.00% -262.31
06/01/2018 DD 06/01/03SEC ID:
31401NP52
FNMA POOL #0713365 5.000% 100.8640 185,205.510 187,578.44 186,805.69 0.06% -772.75
07 /01/2018 DD 07 /01/03SEC ID:
31401NQS1
FNMA POOL #0720319 5.000'Yo 100.8640 567 ,852.000 575,127.62 572,758.24 0.17% -2,369.38
07/01/2018 DD 07/01/03SEC ID:
31401WG45
FNMA POOL #0720369 5.000% 100. 7512 1,863,075.320 1,918,967.58 1,877,071.47 0.56% -41,896.11
06/01/2018 DD 06/0l/03SEC ID:
31401WJNO
FNMA POOL #0721629 5.000% 100.8640 244,114.150 251,437.59 246,223.30 0.07% -5,214.29
07 /01/2018 DD 06/01/03SEC ID:
31401XVW4
FNMA POOL #0723487 5.000%1 100.8640 183,258.860 185,320.54 184,842.22 0.06% -478.32
06/01/2018 DD 06/0l/03SEC ID:
31402AXQ4
FNMA POOL #0725530 5.000% 100.7080 2,800, 138.830 2.838,203.20 2,819,962.58 0.85% -18,240.62
06/01/2019 DD 05/01/04SEC ID:
31402DA75
FNMA POOL #0729601 5.000% 100.8610 328,216.810 332,422.10 331,042.76 0.10% -1,379.34
07/01/2018 DD 07 /Ol/03SEC ID:
31402HRW3
FNMA POOL #0732873 5.000% 100.8520 29,463.150 29,840.63 29,714.18 0.01% -126.45
11/01/2018 DD 10/01/0JSEC ID:
31402MFN5
FNMA POOL #0735227 5.500% 101.1630 948,496.660 956,499.60 959,527.68 0.29% 3,028.08
02/01/2035 DD 01/01/0SSEC ID:
31402QYY1
FNMA POOL #0735856 5.000% 100. 7137 500,000.000 504,843.75 503,568.58 0.15% -1,275.17
08/01/2020 DD 08/0l/05SEC ID:
31402RQH5
FNMA POOL #0737130 5.000% 100.8580 493,511.320 499,834.43 497,745.65 0.15% -2,088.78
10/01/2018 DD 10/0l/03SEC ID:
31402S4P9
FNMA POOL #0738211 5.000% 100.7512 430,603.670 436,120.81 433,838.53 0.13% -2,282.28
10/01/2018 DD 10/01/03SEC ID:
31402UDQ2
7 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate: I OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
Net Unrealized
Price Cost Market Value %of Gain/Loss Description Base Shares Par Base Base Total Base
FNMA POOL #0738487 5.000% 100.8520 155,834.670 157,831.31 157, 162.38 0.05% -668.93
10/01/2018 DD 10/0l/03SEC ID:
31402UNC2
FNMA POOL #0740457 5.000% 100.7512 1.821,344. 710 1,846, 103.6 l 1.835,027 .36 0.55% -11,076.25
10/01/2018 DD 10/01/03SEC ID:
31402WTN8
FNMA POOL #0740471 5.000% 100.7512 639,901.380 648, 100.10 644,708.57 0.19% -3,391.53
10/01/2018 DD 10/01/03SEC ID:
31402WT40
FNMA POOL #0740748 5.000% 100.8580 635.866. 930
10/01/2018 DD l 1/01/03SEC ID:
644,013.97 641,322.67 0.19% ·2,691.30
31402W5H7
FNMA POOL #0743868 5.000% 100.7512 30,253.600 30,641.23 30,480.88 0.01% -160.35
11/01/2018 DD 10/0l/03SEC ID:
31403BMR1
FNMA POOL #0744008 5.000% 100.8670 862,789.850 873,844.35 870,270.24 0.26% -3,574.11
07 /01/2018 DD 09/01/03SEC ID:
31403BR54
FNMA POOL #0744316 5.0001Yo 100.7512 133,033.440
09/01/2018 DD 09/01/03SEC ID:
134,737.93 134,032.84 0.04% -705.09
314038324
FNMA POOL #0747914 5.000% 100.8520 248,201.550 251,381.64 250,316.23 0.08% -1,065.41
11/01/2018 DD 11/0l/03SEC ID:
31403F3XO
FNMA POOL #0748400 5.000% 100.7512 152,436.570
08/01/2018 DD 09/01/03SEC ID:
154,389.67 153,581. 73 0.05% -807.94
31403GNR9
FNMA POOL #0748899 5.000% 100.7512 810,328.860
12/01/2018 DD 1 l/Ol/03SEC ID:
820, 711.20 816,416.37 0.24% -4,294.83
31403G7LO
FNMA POOL #0750377 5.000% 100.7512 1,729,068.910
11/01/2018 DD ll/Ol/03SEC ID:
1,751,222.60 1,742,058.35 0.52% -9,164.25
31403JUA2
FNMA POOL #0750380 5.000% 100. 7512 1,464,503.020
11/01/2018 DD 11/01/03SEC ID:
1,483,266.98 1,475,504.94 0.44% -7,762.04
31403JUD6
FNMA POOL #0750445 5.000% 100.7512 138,541.520
11/01/2018 DD 11/01/03SEC ID:
140,316.58 139,582.30 0.04% -734.28
31403JWE2
8 Workbenc11
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
Net Unrealized
Price Cost Market Value %of Gain/Loss
Description Base Shares Par Base Base Total Base
FNMA POOL #0751960 5.000% 100.7512 655,835.580 664,238.49 660,762.47 0.20% -3,476.02
12/01/2018 DD l l/Ol/03SEC ID:
31403LMH1
FNMA POOL #0753425 5.000% 100.8480 685,625.990 693,553.53 691,440.10 0.21% -2, 113.43
11/01/2018 DD 11/01/03SEC ID:
31403NA23
FNMA POOL #0755165 5.000% 100.8480 486,046.520 492,273.99 490,168.19 0.15% -2,105.80
12/01/2018 DD 11/01/03SEC ID:
31403Q6A3
FNMA POOL #0756372 5.000% 100.8480 812,438.380 821,832.20 819,327.86 0.25%1 -2,504.34
11/01/2018 DD 1 l/01/03SEC ID:
31403SJR8
FNMA POOL #0784251 5.000% 100.8140 2,889,453.030 2,928,731.54 2,912,973.18 0.87% -15,758.36
11/01/2019 DD ll/01/04SEC ID:
31405BH46
FNMA POOL #0789670 5.000% 100.8140 824,878.230 836,091.42 831,592.74 0.25% -4,498.68
12/01/2019 DD 12/01/04SEC ID:
31405HJP4
FNMA POOL #0792432 5.000% 100.8170 824,840.240 836,052.91 831,579.18 0.25% -4,473.73
10/01/2019 DD 10/01/04SEC ID:
31405LLM9
FNMA POOL #0792437 5.000% 100.8170 4,761,399.590 4,761,399.59 4,800,300.22 1.44% 38,900.63
10/01/2019 DD 10/01/04SEC ID:
31405LLS6
FNMA POOL #0794195 5.000% 100.8140 878,943.390 890,891.54 886,097.99 0.27% -4,793.55
11/01/2019 DD ll/Ol/04SEC ID:
31405NKG9
FNMA POOL #0797160 5.000% 100.8140 2,986,752.530 3,027,353.69 3,011,064. 70 0.90% -16,288.99
12/01/2019 DD 12/0l/04SEC ID:
31405RTR7
FNMA POOL #0797408 5.000% 100.8140 788,119.470 798,832.97 794,534.76 0.24% -4,298.21
12/01/2019 DD 12/01/04SEC ID:
31405R3R5
FNMA POOL #0797414 5.000% 100.8140 777,201.620 787,766.69 783,528.04 0.23% -4,238.65
12/01/2019 DD 12/01/04SEC ID:
31405R3X2
FNMA POOL #0800370 5.000% 100.8140 355,801.980 355,412.83 358,698.21 0.11% 3,285.38
12/01/2019 DD ll/01/04SEC ID:
31405VFK8
9 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOUDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
Net Unrealized
Price Cost Market Value %of Gain/Loss
Description Base Shares Par Base Base Total Base
FNMA POOL #0800998 5.500% 101.1580 301,489.090 301,230.01 304,980.33 0.09% 3,750.32
11/01/2034 DD ll/Ol/04SEC ID:
31405V3F2
FNMA POOL #0803923 5.000% 100.8140 2,899,933.270 2,939,354.24 2,923,538. 73 0.88% -15.815.51
12/01/2019 DD 12/01/04SEC ID:
31406AD41
FNMA POOL #0807711 5.000°;., 100.8140 2,911,907.670 2,951,491.41 2,935,610.60 0.88% -15,880.81
01/01/2020 DD 01 /01/05SEC ID:
31406EKY9
FNMA POOL #0808933 5.500% 101.1580 331,646.410 331,361.40 335,486.88 0.10% 4,125.48
01/01/2035 DD 01/01/05SEC ID:
31406FV24
FNMA POOL #0809350 5.500% 101.1580 316,781.440 316,509.21 320,449.77 0.10% 3,940.56
12/01/2034 DD 01/01/05SEC ID:
31406GEX3
FNMA POOL #0814930 5.500% 101.0050 324,521.630 324,242.74 327,783.03 0.10% 3,540.29
04/01/2035 DD 04/01/05SEC ID:
31406NLK8
FNMA POOL #0815923 5.5001Yu 101.1580 323,498.400 323,220.40 327,244.51 0.10% 4,024.11
03/01/2035 DD 03/01/05SEC ID:
31406PPG8
FNMA POOL #0816246 5.000% 100.8140 619,956.250 619,278.17 625,002.69 0.19% 5,724.52
03/01/2020 DD 03/01/05SEC ID:
31406PZK8
FNMA POOL #0819566 5.500% 101.1580 324,277.050 323,998.38 328,032.18 0.10% 4,033.80
04/01/2035 DD 04/01/05SEC ID:
31406TQT1
FNMA POOL #0822731 5.500% 101.1580 329,597.670 329,314.42 333,414.41 0.10% 4,099.99
05/01/2035 DD 05/01/05SEC ID:
31406XA85
FNMA POOL #0823232 5. S001Yu 101.1580 331,391.410
06/01/2035 DD 05/01/0SSEC ID:
331,106.61 335,228.92 0.10% 4, 122.31
31406XSV5
FNMA POOL #0823787 5.000% 100.8140 1, 938,413.060 1,936,292.91 l,954, 191.74 0.59% 17,898.83
05/01/2020 DD 05/01/05SEC ID:
31406YF47
GNMA POOL #0421389 6.500% 104.2850 7,913.460 8,305.43 8,252.55 0.00% -52.88
04/15/2026 DD 04/01/96SEC ID:
36206UC23
10 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
i Exchange Rate:
I OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
-···---·--·--·-Net Unrealized
Price Cost Market Value %of Gain/Loss
Description Base Shares Par Base Base Total Base;
GNMA POOL #0449851 6.500% 104.1862 11,947.310 12,539.07 12,447.45 0.00% -91.62
Ol/ 15/2028 DD 01/0l/98SEC ID:
36208FWLO
GNMA POOL #0466845 6.500% 104.2600 32,330.190 33,931.55 33,707.46 0.01% -224.09
06/ 15/2028 DD 06/01/98SEC ID:
36209BTA6
GNMA POOL #0468052 6.500% 104.2570 39,958.060 41,937.23 41,659.07 0.01% -278.16
07/15/2028 DD 07/0l/98SEC ID:
36209C5M4
GNMA POOL #0476041 6.500% 104.2600 115,828.400 121,384.56 120,762.69 0.04% -621.87
06/ 15/2028 DD 06/01/98SEC ID:
36209MZE7
GNMA POOL #04 78626 6.500% 104.2430 119,126.890 124,841.26 124,181.44 0.04% -659.82
Ol/ 15/2029 DD 01/0l/99SEC ID:
36209QVT9
GNMA POOL #0480598 6.500% 104.2480 28,454.200 29,819.10 29,662.93 0.01% -156.17
10/15/2028 DD 10/01/98SEC ID:
36209S3F6
GNMA POOL #0512235 6.500% 104.2140 5,811.330 6,099.17 6,056.22 0.00% -42.95
11/15/2029DDl1/01/99SEC ID:
36211GBC6
GNMA POOL #0514326 6.500% 104.2250 76,936.720 80,627.27 80,187.30 0.02% -439.97
07/15/2029 DD 07/01/99SEC ID:
36211JLF2
GNMA 11 POOL #0080023VAR RT 101.5040 131,306.680 133,481.44 133,281.53 0.04% -199.91
12/20/2026 DD 12/01/96SEC ID:
36225CAZ9
GNMA II POOL #080088M 7.375% 101.1660 159,476.430 162,964.97 161,335.93 0.05% -1,629.04
06/20/2027 DD 06/0l/97SEC ID:
36225CC20
GNMA II POOL #0080395VAR RT 101.2550 137,509.150 136,262.98 139,234.89 0.04% 2,971.91
04/20/2030 DD 04/01/00SEC ID:
36225CNM4
GNMA II POOL #080408XVAR RT 101.2530 1,221, 758. 770 1,209,350.28 1,237,067.41 0.37% 27,717.13
05/20/2030 DD 05/01/00SEC ID:
36225CN28
GNMA II POOL #0080965VAR RT 100.6930 1, 149,886.720 1,149,168.03 1, 157 ,855.43 0.35% 8,687.40
07 /20/2034 DD 07 /0l/04SEC ID:
36225DCB8
11 WorklJench
I OCSD-CONSOLIDATED -OCSGOOOlOOOO
Asset Detail
by Currency
8/31/2005
----------------~-~-----··-·--·---·
Price Cost
Description Base Shares Par
GENERAL ELEC CO NTVAR RT 99.9840 6,500,000.000
10/24/2005 DD 10/24/03SEC ID:
369604AZ6
GOLDMAN SACHS GRP MTN 100.0780 2,000,000.000
#TR00203VAR RT 03/30/2007 DD
04/0l/04SECID:38141EJL4
GOLDMAN SACHS GRP MTN 100.5150 800,000.000
#TR00207VAR RT 07 /23/2009 DD
07/23/04SECID:38141EJQ3
GOLDMAN SACHS GRPVAR RT 100.2180 4,250,000.000
06/28/2010 DD 06/28/05SEC ID:
38143UBD2
GNMA GTD REMIC TR 2000-9 100.6760 412,129.020
FHVAR RT 02/ 16/2030SEC ID:
3837H4NX9
HSBC BK USA MTN #SR00012VAR 100.1250 250,000.000
RT 09/21/2007 DD 09/21/04SEC
ID: 4042QOAM 1
HSBC FIN CORP MTN # TR 100.0460 3,000,000.000
00002VAR RT 02/28/2007 DD
03/29/05SECID:40429JAB3
HSBC FIN CORP MTN # TR 99.9840 3,000,000.000
00007VAR RT 05/ 10/2010 DD
05/10/05SECID:40429JAG2
HOUSEHOLD FIN CORP NT 7.250% 101.9840 500,000.000
05/15/2006 DD 05/ 15/96SEC ID:
441812FT6
HOUSEHOLD FIN CORP NT7.200% 102.3430 2,500,000.000
07/15/2006 DD 07/15/99SEC ID:
441812GHI
MORGAN STANLEYVAR RT 100.0620 2,000,000.000
01/12/2007 DD 01/13/04SEC ID:
61746BAK2
MORGAN STANLEY NT 3.875% 98.4370 3,200,000.000
01/15/2009 DD 01/13/04SEC ID:
61746BALO
MORGAN STANLEY NTVAR RT 100.0310 650,000.000
11/09/2006 DD 11/ 12/04SEC ID:
61746SAZ2
12
Base
6,502,203.50
2,001,900.00
800,000.00
4,250,000.00
412,129.02
250,170.00
3,000,000.00
2,995,830.00
511,620.00
2,591,500.00
2,002,980.00
3,149,248.00
650,000.00
Report ID: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
Net Unrealized
Market Value %of Gain/Loss
Base Total Base
6,498,960.00 1.95% -3,243.50
2,001,560.00 0.60% -340.00
804,120.00 0.24% 4,120.00
4,259,265.00 1.28% 9,265.00
414,915.01 0.12% 2,785.99
250,312.50 0.08% 142.50
3,001,380.00 0.90% 1,380.00
2,999,520.00 0.90% 3,690.00
509,920.00 0.15% -1,700.00
2,558,575.00 0.77% -32,925.00
2,001,240.00 0.60% -1,740.00
3, 149,984.00 0.94% 736.00
650,201.50 0.19% 201.50
Workbenc11
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/31/2005 Status: FINAL
Net Unrealized
Price Cost Market Value %of Gain/Loss
Description Base Shares Par Base Base Total Base
PUBLIC SVC ELEC & GAS CO 99.9840 1,400,000.000 1,400,000.00 1,399,776.00 0.42% -224.00
lSTVAR RT 06/23/2006 DD
06/25/04SECID:744567FN3
RESIDENTIAL ASSET 03-RS 11 100.0800 373,496.210 373,496.21 373,795.01 0.11% 298.80
AllBVAR RT 12/25/2033 DD
12/30/03SECID:760985K83
SALOMON SMITH MTN # SR 100.2030 2,300,000.000 2,308,514.60 2,304,669.00 0.69% -3,845.60
00206VAR RT 05/ 18/2007 DD
05/28/02SECID:79548EJP8
SBA GTD DEV PARTN 2001-20C 16. 107.0950 2, 774,342.070 2,774,342.07 2,971, 181.64 0.89% 196,839.57
340%1 03/01/2021SEC ID:
83162CWO
SBA GTD PARTN CTFS SBIC-PS 01 101.0920 1, 146,403.330 1, 146,403.33 1, 158,922.05 0.35% 12,518.72
6.640'Yo 02/10/2011 DD
02/21/01SECID:831641DD4
SOUTHWESTERN BELL TEL CO 100.4680 1,000,000.000 1,007,520.00 1,004,680.00 0.30% -2,840.00
MED6.560% 11/15/2005 DD
ll/15/96SEC1D:84534EDS4
TOYOTA MTR CR MTN #TR00413VAR 99.9840 2,000,000.000 1,998,188.00 1,999,680.00 0.60% 1,492.00
RT 09/ 18/2006 DD 03/ 16/05SEC
ID:89233PTE6
UNITED AIRLS PASSTHRU 01-1 C 6. 65.5480 1,600,000.000 1,600,000.00 1,048,768.00 0.31% -551,232.00
831% 03/01/2010 DD
08/22/01SECID:909317BC2
US TREASURY INFLATION INDEX 103.6875 8,487,695.540 7 ,548,382.86 8,800,679.31 2.64% 1,252,296.45
NT 3.375% Ol / 15/2007 DD
Ol/15/97SEC ID: 9128272M3
US TREASURY INFLATION INDEX NT 106.0940 2,528,211.000 2,743,408.60 2,682,280.18 0.80% -61, 128.42
3.625% 01/ 15/2008 DD
Ol/15/98SECID:9128273T7
US TREASURY INFLATION INDEX NT 108.7500 11,266,620.000 12,446,596. 76 12,252,449.25 3.67% -194,147.51
3.875% 01/15/2009 DD
Ol/15/99SECID:9128274Y5
US TREASURY NOTESOS.750% 100.4690 3,900,000.000 4,193,993.62 3,918,291.00 1.17% -275, 702.62
11/15/2005 DD 11/ 15/00SEC ID:
9128276N7
U S TREASURY NOTES 4.250% 101.7970 2, 100,000.000 2,102,478.74 2,137,737.00 0.64% 35,258.26
08/15/2013 DD 08/15/03SEC ID:
912828BH2
13 Workbencl1
Asset Detail Report ID: GL8013
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/31/2005 Status: FINAL
Net Unrealized
Price Cost Market Value %of Gain/Loss
' Description Base Shares Par Base Base Total Base
U S TREASURY NOTES 3.375% 98.5900 10,900,000.000 10,644,845.28 10, 746,310.00 3.22% 101,464.72
12/ 15/2008 DD 12/ 15/03SEC ID:
912828BT6
US TREASURY INFLATION INDEXED 103.1200 105,262.000 107,467.37 108,546.17 0.03% 1,078.80
2.000°/c, 01/ 15/2014 DD
Ol/15/04SEC ID: 912828BW9
us TREASURY NOTES 2.75o•y., 99.1900 12,500,000.000 12,483,394.83 12,398,750.00 3.72% -84,644.83
06/30/2006 DD 06/30/04SEC ID:
912828CMO
US TREASURY INFLATION INDEX 103.2400 3, 198,673.000 3 ,286, 540.88 3,302,310.01 0.99% 15,769.13
NT 2.000% 07 /15/2014 DD
07/15/04SECID:912828CP3
US TREASURY NOTES 2.750% 99.1000 14,000,000.000 14,029,693.55 13,874,000.00 4.16% -155,693.55
07/31/2006 DD 07/31/04SEC ID:
912828CQ1
US TREASURY NOTES 2.375% 98.6600 35,300,000.000 35, 120, 197.62 34,826, 980.00 10.44% -293,217.62
08/31/2006 DD 08/31/04SEC ID:
912828CU2
U S TREASURY NOTES 2.875% 98.9000 20,800,000.000 20,640,268.90 20,571,200.00 6.16% -69,068.90
11/30/2006 DD 11 /30/04SEC ID:
912828DD9
US TREASURY NOTES 3.500% 98.6300 13,920,000.000 13,733,493.75 13, 729,296.00 4.11% -4,197.75
12/ 15/2009 DD 12/ 15/04SEC ID:
912828DE7
US TREASURY NOTES 4.000% 100.5900 31,200,000.000 31,051,201.06 31,384,080.00 9.40% 332,878.94
03/15/2010 DD 03/15/05SEC ID:
912828DP2
U S TREASURY NOTES 3.750% 99.9000 11,200,000.000 11, 166,717.52 11, 188,800.00 3.35% 22,082.48
03/31/2007 DD 03/31/05SEC ID:
912828DQO
U S TREASURY NOTES 3.500% 99.4700 11,000,000.000 10,902, 179.20 10, 941, 700.00 3.28% 39,520.80
05/31/2007 DD 05/31/0SSEC ID:
912828DW7
US TREASURY NOTES 3.625% 99.6500 20,000,000.000 19,853,379.98 19,930,000.00 5.97'Yo 76,620.02
06/30/2007 DD 06/30/0SSEC ID:
912828DY3
VIRGINIA ELEC & PWR 01 SER AS. 100.9370 1,750,000.000 1,743,840.00 1,766,397.50 0.53% 22,557.50
750% 03/31/2006 DD
03/27/01SECID:927804ENO
TOTAL FIXED INCOME SECURITIES 348,626,301.110 348, 735,972.63 349,062,251.06 104.60% 326,278.43
14 Workbench
OCSD-CONSOLIDATED • OCSGOOOlOOOO
Asset Detail
by Currency
8/31/2005
---------~-----·--··· ----
Price
Description Base
TOTAL ASSETS U.S. DOLLAR
TOTAL ASSETS • BASE:
Shares Par
387,427,521.080
387 ,427 ,521.080
15
Cost
Base
333,393,098.18
333,393,098.18
Report ID: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
Market Value
Base
333,719,376.61
333, 719,376.61
%of
Total
100.00%
100.00%
Net Unrealized
Gain/Loss
Base
326,278.43
326,278.43
Workbench
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/ l/2005 -8/31/2005
Tran
Type Description
Trade Date
Settle Date
Reported Date
RECEIPTS AND DISBURSEMENT TRANSACTIONS
DISTRIBUTION TO PLAN ADMINISTRATOR
U.S. DOLLAR
CW TRAN TO ORANGE COUNTYSEC ID:
NA9 l 234590CSF07522202: LONG TERM
OPER-PIMCO
CW TRAN TO ORANGE COUNTYSEC ID:
NA91234590CSF07522202: LONG TERM
OPER-PIMCO
CW TRAN TO ORANGE COUNTYSEC ID:
NA91234590CSF07522202: LONG TERM
OPER-PIMCO
8/4/2005
8/4/2005
8/11/2005
8/11/2005
8/31/2005
8/31/2005
Local Price
Base Price
Base Ex Rate
TOTAL DISTRIBUTION TO PLAN ADMINISTRATOR U.S. DOLLAR:
TOTAL DISTRIBUTION TO PLAN ADMINISTRATOR BASE:
TOTAL RECEIPTS AND DISBURSEMENT TRANSACTIONS BASE:
PURCHASES
8
CASH & CASH EQUIVALENTS
U.S. DOLLAR
BANKAMERICA CORP DISC 11 /21 /2005SEC 8/23/2005
ID: 0660POYM98ROKER: BANC OF AMERICA 8/23/2005
SEC LLC, SAN FRANCISCOOCSF0751l102: 8/23/2005
LIQUID OPER-PIMCO
·k Actual Settle Date
99.0675
1
Shares/Par
0.000
0.000
0.000
0.000
o.ooo
0.000
1, 100,000.000
Cost
Base
-10,000,000.00
-10,000,000.00
-10,000,000.00
-30,000,000.00
-30,000,000.00
-30,000,000.00
1,089,742.50
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
-10,000,000.00
-10,000,000.00
-10,000,000.00
-30,000,000.00
-30,000,000.00
-30,000,000.00
-1,089,742.50
Net Gain/Loss
Base
0.00
0.00
0.00
0.00
o.oo
o.oo
0.00
Workbench
Transaction Detail Report ID: EWBA09
I OCSD-CONSOLIDATED -OCSGOOOlOOOO
Reported by Transaction Category Base Currency: USD
8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
8 CITIBANK NA NY BRH INSTL C/D 3.720% 8/9/2005 100.0000 1,500,000.000 1,500,000.00 • l ,500,000.00 0.00
11/09/2005 DD 08/09/0SSEC ID: 8/9/2005 l 7304TXA6BROKER: CITIGROUP GBL
MKTS/SALOMON, NEW YORKOCSF07511102: ~/9/2oo5 ~
LIQUID OPER-PIMCO 8/ 10/ 200::> *
B DU PONT DE NEMOUR DISC 09/28/2005SEC 8/8/2005 99.5013 1,900.000.000 1,890,525.33 -1,890,525.33 0.00
ID: 26354AWU4BROKER: GOLDMAN SACHS 8/8/2005 & CO, NYOCSF0751l102: LIQUID OPER-8/8/2005 PIMCO
B FEDERAL HOME LN BK CONS DISC N MAT 8/2/2005 99.9913 1,900,000.000 1,899,833.75 -1,899,833.75 0.00
08/03/2005SEC ID: 313385JY3BROKER: 8/2/2005 BARCLAYS CAPITAL INC, NEW 8/2/2005 YORKOCSF0751l102: LIQUID OPER-PIMCO
B FEDEARL HOME LN BK CONS DISC N MAT 8/3/2005 99.9914 2,600,000.000 2,599, 776.83 -2,599,776.83 0.00
08/04/2005SEC ID: 313385JZOBROKER: 8/3/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/3/2005 NYOCSF07511102: LIQUID OPER-PIMCO
B FEDERAL HOME LN BK CONS DISC MAT 8/4/2005 99.9911 2,300,000.000 2,299,794.28 -2,299,794.28 0.00
8/5/2005SECID:313385KA3BROKER: 8/4/2005 BARCLAYS CAPITAL INC, NEW 8/4/2005 YORKOCSF07511102: LIQUID OPER-PIMCO
B FEDERAL HOME LN BK CONS DISC N MAT 8/5/2005 99.9725 400,000.000 399,890.00 -399,890.00 0.00
08/08/2005SECID:313385KD7BROKER: 8/5/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/5/2005 NYOCSF07511102: LIQUID OPER-PIMCO
B FEDERAL HOME LN BK CONS DISC MAT 8/8/2005 99.9906 700,000.000 699,934.28 -699,934.28 0.00
08/09/2005SEC ID: 313385KE5BROKER: 8/8/2005 CREDIT SUISSE, NEW YORKOCSF0751l102: 8/8/2005 LIQUID OPER-PIMCO
B FEDERAL HOME LN BK CONS DISC N MAT 8/10/2005 99.9908 800,000.000 799,926.67 -799,926.67 0.00
08/ 1 l/2005SEC ID: 313385KGOBROKER: 8/ 10/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 81 I0/2005 LIQUID OPER-PIMCO
Workbench
* Actual Settle Date
2
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
8 FEDERAL HOME LN BK CONS DISCSEC ID: 8/5/2005 98.1042 1,900,000.000 1,863, 979.17 -1,863,979.17 0.00 313385SQOBROKER: BANC OF AMERICA SEC8/5/2005
LLC, SAN FRANCISCOOCSF07511102: LIQUID8/5/2005
OPER-PIMCO
8 FEDERAL HOME LN BK CONS DISC N MAT 8/30/2005 98.1227 300,000.000 294,368.00 -294,368.00 0.00 02/22/2006SECID:313385TK2BROKER:JP 8/30/2005 MORGAN CHASE BANK/HSBCI, NEW 8/30/2005 YORKOCSF0751l102: LIQUID OPER-PIMCO
B FEDERAL HOME LN MTG CORP DISC MAT 8/9/2005 99.0923 l, 100,000.000 1,090,015.03 -1,090,015.03 0.00 1 l/08/2005SEC ID: 313397NZOBROKER: 8/9/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/9/2005
NYOCSF07511102: LIQUID OPER-PIMCO
B FED HOME LN MTG CORP DISC NTS MAT 8/15/2005 99.0749 2, 700,000.000 2,675,022.00 -2,675,022.00 0.00
11/15/2005SECID:313397PGOBROKER: 8/15/2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 8/ 15/2005
LONG TERM OPER-PIMCO
B FEDERAL HOME LN MTG CORP DISC MAT 8/24/2005 98.8694 200.000.000 197,738.89 -197, 738.89 0.00 12/ 12/2005SEC ID: 313397QKOBROKER: 8/24/2005 CREDIT SUISSE, NEW YORKOCSF07522202: 8/24/2005 LONG TERM OPER-PIMCO
B FEDERAL NATL MTG ASSN DISCOUNT MAT 8/8/2005 99.9906 1,300,000.000 1,299,877.94 -1,299,877.94 0.00 08/09/2005SEC ID: 313589KE2BROKER: 8/8/2005 GOLDMAN SACHS & CO, NYOCSF07511102: 8/8/2005 LIQUID OPER-PIMCO
8 FEDERAL NATL MTG ASSN DISCOUNT MAT 8/9/2005 99.9907 1, 100,000.000 1,099,897.33 -1,099,897.33 0.00 08/ 10/2005SEC ID: 313589KF9BROKER: 8/9/2005 GOLDMAN SACHS & CO, NYOCSF0751l102: 8/9/2005 LIQUID OPER-PIMCO
B FEDERAL NATL MTG ASSN DISCOUNT MAT 8/10/2005 99.9909 2,800,000.000 2,799,744.89 -2,799,744.89 0.00 8/ l l/2005SEC ID: 313589KG7BROKER: 8/10/2005 BANC OF AMERICA SEC LLC, SAN 8/10/2005 FRANCISCOOCSF0751l102: LIQUID OPER-
PIMCO
Workbench
k Actual Settle Date 3
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
I I Trade Date Local Price
/Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base I
8 FEDERAL NATL MTG ASSN DISCOUNT MAT 8/11/2005 99.9909 1, 100,000.000 1,099,899. 78 -1,099,899.78 0.00
08/ 12/2005SEC ID: 313589KH5BROKER: 8/ 11 /2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ l l/2005
NYOCSF075ll102: LIQUID OPER-PIMCO
8 FEDERAL NATL MTG ASSN DISC NTS MAT 8/12/2005 99.9725 1, 100,000.000 1,099,697.50 -1,099,697.50 0.00
08/ 15/2005SEC ID: 313589KL6BROKER: 8/12/2005 GOLDMAN SACHS & CO, NYOCSF0751l102: 8/12/2005 LIQUID OPER-PIMCO
8 FEDERAL NATL MTG ASSN DISC NT MAT 8/15/2005 99.9908 1, 100,000.000 1,099,898.56 -1,099,898.56 0.00
08/ 16/2005SEC ID: 313589KM48ROKER: 8/ 15/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ 1512005 NYOCSF07511102: LIQUID OPER-PIMCO
8 FEDERAL NATL MTG ASSN DISC NTS MAT 8/16/2005 99.9906 1, 100,000.000 1,099,896.72 -1,099 ,896. 72 0.00
08/ 17 /2005SEC ID: 313589KN2BROKER: 8/16/2005 BANC OF AMERICA SEC LLC, SAN 8/16/2005 FRANCISCOOCSF075ll102: LIQUID OPER-
PIMCO
B FEDERAL NATL MTG ASSN DISCOUNTSEC 8/17/2005 99.9906 1, 100,000.000 1,099,896.72 -1,099,896. 72 0.00
ID: 313589KP7BROKER: BANC OF AMERICA 8/17/2005 SEC LLC, SAN FRANCISCOOCSF075 l 1l02: 8/17/2005 LIQUID OPER·PIMCO
8 FEDERAL NATL MTG ASSN DISCOUNT MAT 8/18/2005 99.9906 1, 100,000.000 1,099,896.72 -1,099,896.72 0.00
08/19/2005SEC ID: 313589KQ5BROKER: 8/18/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 811812005 NYOCSF07511102: LIQUID OPER-PIMCO
8 FEDERAL NATL MTG ASSN DISCOUNT MAT 8/19/2005 99.9719 1, 100,000.000 1,099,691.08 -1,099,691.08 0.00
08/22/2005SEC ID: 313589KT9BROKER: 8/ 19/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8 / l 9 / 2005
NYOCSF075 l l l 02: LIQUID OPER-PIMCO
B FEDERAL NATL MTG ASSN DISCNTS MAT 8/22/2005 99.9906 1,100,000.000 1,099,897.03 -1,099,897.03 0.00
08/23/2005SECID:313589KU6BROKER: 8/22/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 812212005 NYOCSF0751l102: LIQUID OPER-PIMCO
Workbench
·1c Actual Settle Date
4
Transaction Detail
Reported by Transaction Category
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Trade Date
Tran Settle Date
Type Description Reported Date
B
8
B
B
B
B
B
B
FEDERAL NATL MTG ASSN DISCOUNT MAT 8/24/2005
12/19/2005SECID:313589QS5BROKER: 8/24/2005
LEHMAN GOVT SECS INC, NYOCSF075 l l 102: 8/24/2005
LIQUID OPER-PIMCO
FEDERAL NATL MTG ASSN DISCOUNT MAT 8/30/2005
02/08/2006SEC ID: 313589SV6BROKER: 8/30/2005 UBS SECURITIES LLC, 8/30/2005 STAMFORDOCSF07511102: LIQUID OPER·
PIM CO
GENERAL ELEC CAP DISC 09/09/2005SEC 8/4/2005
ID: 36959HW94BROKER: MORGAN STANLEY 8/4/2005 & CO INC, NYOCSF07511102: LIQUID OPER-8/4/2005 PIM CO
GENERAL ELEC CAP DISC 09/09/2005SEC 8/8/2005
ID: 36959HW94BROKER: BANC OF AMERICA 8/8/2005
SEC LLC, SAN FRANCISCOOCSF0751l102: 8/8/2005
LIQUID OPER-PIMCO
US TREASURY BILL 0.000% 09/01/2005 DD 8/11/2005
03/03/05SEC ID: 912795VP3BROKER: BANC 8/ 11/2005
OF AMERICA SEC LLC, SAN 8/ 11/2005
FRANCISCOOCSF07511102: LIQUID OPER-
PIM CO
WELLS FARGO BANK NA INSTL C/D 3.500% 8/11/2005
09/06/2005 DD 08/ 12/05SEC ID: 8/12/2005 9497P2H67BROKER: WELLS FARGO 8/11/2005 BROKERAGE SVCS LLC,
MINNEAPOCSF0751l102: LIQUID OPER-
E~N CAT 1 REPO REPO 03.240% 8/1/2005
08/02/2005 DD 08/01/05SEC ID: 8/1/2005 99438U669BROKER: LEHMAN GOVT SECS 8/ 1/2005
INC, NYOCSF07511l02: LIQUID OPER-PIMCO
LEHMAN CAT 2 REPO 03.170% 08/03/2005 8/2/2005
DD 08/02/0SSEC ID: 99438W475BROKER: 8/2/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/2/2005
LIQUID OPER-PIMCO
·k Actual Settle Date
8/ 1/2005 -8/31/2005
Local Price
Base Price
Base Ex Rate Shares/Par
98.7943 3,000,000.000
98.2698 900,000.000
99.6520 1,096,000.000
99.6907 800,000.000
99.8116 800,000.000
100.0000 1,800,000.000
100.0000 7 ,800,000.000
100.0000 7 ,800,000.000
5
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Cost Amount Net Gain/Loss
Base Base Base
2,963,827.50 -2, 963,827 .50 0.00
884,427.75 -884,427. 75 0.00
1,092, 185.92 -1,092,185.92 0.00
797,525.33 -797,525.33 0.00
798,492.67 -798,492.67 0.00
1,800,000.00 -1,800,000.00 0.00
7 ,800,000.00 -7,800,000.00 0.00
7,800,000.00 -7,800,000.00 0.00
Workbenc11
Transaction Detail Report ID: EWBA09
I Reported by Transaction Category Base Currency: USD
I OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
8 CS FOB CAT 2 REPO REPO 03.100% 8/3/2005 100.0000 5,800,000.000 5,800,000.00 -5,800,000.00 0.00
08/04/2005 DD 08/03/05SEC ID: 8/3/2005 99438Y083BROKER: CREDIT SUISSE, NEW 8/3/2005 YORKOCSF07511102: LIQUID OPER-PIMCO
8 LEHMAN CAT 1 REPO REPO 03.120% 8/3/2005 100.0000 1,300,000.000 1,300,000.00 -1,300,000.00 0.00
08/04/2005 DD 08/03/05SEC ID: 8/3/2005 99438Yl 748ROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8/3/2oo5
8 LEHMAN CAT 1 REPO REPO 03.260% 8/4/2005 100.0000 7,800,000.000 7,800,000.00 -7,800,000.00 0.00
08/05/2005 DD 08/04/05SEC ID: 8/4/2005 99438Z6768ROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8/4/2oo5
8 LEHMAN CAT 2 REPO 03.350% 08/08/2005 8/5/2005 100.0000 7,800,000.000 7 ,800,000.00 -7,800,000.00 0.00
DD 08/05/05SEC ID: 994398298BROKER: 8/5/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/5/2005 LIQUID OPER-PIMCO
8 LEHMAN CAT 1 REPO REPO 03.430% 8/8/2005 100.0000 7 ,800,000.000 7,800,000.00 -7,800,000.00 0.00
08/09/2005 DD 08/08/05SEC JD: 8/8/2005 99439C908BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8/8/200S
B LEHMAN CAT 2 REPO 03.350% 08/ 10/2005 8/9/2005 100.0000 7,800,000.000 7,800,000.00 -7 ,800,000.00 0.00
DD 08/09/05SEC ID: 99439E714BROKER: 8/9/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/9/2005 LIQUID OPER-PIMCO
B LEHMAN CAT 2 REPO 03.320% 08/ 11/2005 8/ 10/2005 100.0000 7,800,000.000 7,800,000.00 -7,800,000.00 0.00
DD 08/ 10/05SEC ID: 99439G321BROKER: 8/ 10/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ l0/2005 LIQUID OPER-PIMCO
B LEHMAN CAT 1 REPO REPO 03.370% 8/11/2005 100.0000 7 ,800,000.000 7,800,000.00 -7,800,000.00 0.00
08/ 12/2005 DD 08/ l 1/05SEC ID: 8/ 11/2005 99439H980BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8/ l l/200S
Workbench
·k Actual Settle Date
6
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
B LEHMAN CAT 2 REPO 03.430% 08/ 15/2005 8/12/2005 100.0000 7,800,000.000 7,800,000.00 -7 ,800,000.00 0.00 DD 08/ 12/05SEC ID: 99439K520BROKER: 8/ 12/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ l2/2005
LIQUID OPER-PIMCO
B LEHMAN CAT 2 REPO 03.490% 08/ 16/2005 8/15/2005 100.0000 7,800,000.000 7,800,000.00 -7,800,000.00 0.00 DD 08/15/05SEC ID: 99439M187BROKER: 8/15/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ 15/2005
LIQUID OPER-PIMCO
B LEHMAN CAT 2 REPO 03.380% 08/ 17 /2005 8/16/2005 100.0000 7,800,000.000 7,800,000.00 -7,800,000.00 0.00 DD 08/ 16/05SEC ID: 99439N763BROKER: 8/ 16/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ l6/2005
LIQUID OPER-PIMCO
B LEHMAN CAT 2 REPO 03.400% 08/ 18/2005 8/17/2005 100.0000 7,800,000.000 7,800,000.00 -7,800,000.00 0.00 DD 08/ 17 /05SEC ID: 99439Q337BROKER: 8/ 17 /2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ l 7 /2005
LIQUID OPER-PIMCO
B LEHMAN CAT 1 REPO REPO 03.490% 8/18/2005 100.0000 7,800,000.000 7,800,000.00 -7 ,800,000.00 0.00 08/ 19/2005 DD 08/18/05SEC ID: 8/18/2005 99439R92 l BROKER: LEHMAN GOVT SECS 8/ 18/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
8 LEHMAN CAT 1 REPO REPO 03.450% 8/19/2005 100.0000 900,000.000 900,000.00 -900,000.00 0.00 08/22/2005 DD 08/ 19/05SEC ID: 8/19/2005 99439T448BROKER: LEHMAN GOVT SECS 8/19/2005 INC, NYOCSF07522202: LONG TERM OPER-
PIMCO
8 LEHMAN CAT 1 REPO REPO 03.450% 8/19/2005 100.0000 7 ,800,000.000 7,800,000.00 -7 ,800,000.00 0.00 08/22/2005 DD 08/ 19/05SEC ID: 8/19/2005 99439T448BROKER: LEHMAN GOVT SECS 8/19/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 03.450% 8/22/2005 100.0000 1,200,000.000 1,200,000.00 -1,200,000.00 0.00 08/23/2005 DD 08/22/05SEC ID: 8/22/2005 99439T8448ROKER: CREDIT SUISSE, NEW 8/22/2005 YORKOCSF07522202: LONG TERM OPER-
PIMCO
Workbe11cl1
·• Actual Settle Date 7
OCSD-CONSOLIDATED • OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/1/2005-8/31/2005
8
8
8
8
B
B
8
8
Tran
Type Description
Trade Date
Settle Date
Reported Date
LEHMAN CAT 1 REPO REPO 03.450% 8/22/2005
08/23/2005 DD 08/22/0SSEC ID: 8/22/2005
99439V0058ROKER: LEHMAN GOVT SECS / /?005
INC, NYOCSF075ll102: LIQUID OPER-PIMCO 8 22 -
CS FOB CAT 2 REPO REPO 03.460'V., 8/23/2005
08/24/2005 DD 08/23/05SEC ID: 8/23/2005
99439W466BROKER: CREDIT SUISSE, NEW 8/2J/2005
YORKOCSF07522202: LONG TERM OPER·
PIM CO
LEHMAN CAT 2 REPO 03.460% 08/24/2005 8/23/2005
DD 08/23/05SEC ID: 99439W664BROKER: 8/23/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 812312005 LIQUID OPER-PIMCO
LEHMAN CAT 1 REPO REPO 03.450% 8/24/2005
08/25/2005 DD 08/24/05SEC ID: 8/24/2005
99439YO l 78ROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8/24/2oo5
LEHMAN CAT 1 REPO REPO 03.480% 8/25/2005
08/26/2005 DD 08/25/05SEC ID: 8/25/2005
99439Z626BROKER: LEHMAN GOVT SECS
INC, NYOCSF0751l102: LIQUID OPER-PJMCO 8f 25/20o5
LEHMAN CAT 1 REPO REPO 03.510% 8/26/2005
08/29/2005 DD 08/26/05SEC ID: 8/26/2005
994408188BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8f 26/2005
LEHMAN CAT 1 REPO REPO 03.520% 8/29/2005
08/30/2005 DD 08/29/0SSEC ID: 8/29/2005
99440C889BROKER: LEHMAN GOVT SECS
INC, NYOCSF0751l102: LIQUID OPER-PIMCO 8f29/200S
LEHMAN CAT 1 REPO REPO 03.470% 8/30/2005
08/31/2005 DD 08/30/05SEC ID: 8/30/2005
99440E323BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8/3o/2oo5
·1< Actual Settle Date
Local Price
Base Price
Base Ex Rate
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
8
Shares/Par
7,800,000.000
1,300,000.000
7,800,000.000
4,300,000.000
4,400,000.000
4,400,000.000
4,400,000.000
3,200,000.000
Cost
Base
7,800,000.00
1,300,000.00
7,800,000.00
4,300,000.00
4,400,000.00
4,400,000.00
4,400,000.00
3,200,000.00
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
Net Gain/Loss
Base
-7,800,000.00 0.00
-1,300,000.00 0.00
-7,800,000.00 0.00
-4,300,000.00 0.00
-4,400,000.00 0.00
-4,400,000.00 0.00
-4,400,000.00 0.00
-3,200,000.00 0.00
Workbench
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
8 cs FOB CAT 2 REPO REPO 03.500rYo 8/31/2005 100.0000 3,200,000.000 3,200,000.00 -3,200,000.00 0.00
09/01/2005 DD 08/31/05SEC ID: 8/31/2005 99440F7188ROKER: CREDIT SUISSE, NEW 8/31/2005 YORKOCSF07511102: LIQUID OPER-PIMCO
B DREYFUS TREASURY CASH MGMTSEC ID: 8/1/2005 1.0000 192,501.320 192,501.32 -192,501.32 0.00
99608524 70CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/1/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/1/2005 1.0000 2,922,791.500 2,922,791.50 -2,922,791.50 0.00
99608524 70CSF0751 l 102: LIQUID OPER-8/1/2005 PIM CO 8/1/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/2/2005 1.0000 35,325.780 35,325.78 -35,325.78 0.00
99608524 70CSF07522202: LONG TERM 8/2/2005 OPER-PIMCO 8/2/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/3/2005 1.0000 2,258.790 2,258.79 -2,258.79 0.00
9960852470CSF07511102: LIQUID OPER-8/3/2005 PIM CO 8/3/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/3/2005 1.0000 9,695, 112.580 9,695, 112.58 -9,695,112.58 0.00
99608524 70CSF07522202: LONG TERM 8/3/2005 OPER-PIMCO 8/3/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/5/2005 1.0000 36,837.160 36,837.16 -36,837.16 0.00
9960852470CSF07511102: LIQUID OPER-8/5/2005 PIM CO 8/5/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/8/2005 1.0000 414,314.620 414,314.62 -414,314.62 0.00
9960852470CSF0751l102: LIQUID OPER-8/8/2005 PIMCO 8/8/2005
Workbench
• Actual Settle Date 9
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/9/2005 1.0000 5,462.560 5,462.56 -5,462.56 0.00
9960852470CSF07522202: LONG TERM 8/9/2005 OPER-PIMCO 8/9/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/9/2005 1.0000 1, 138,762. 750 1,138,762.75 -1,138,762.75 0.00
99608524 70CSF07511102: LIQUID OPER-8/9/2005 PIMCO 8/9/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/10/2005 1.0000 533,345.550 533,345.55 -533,345.55 0.00
99608524 70CSF07522202: LONG TERM 8/10/2005 OPER-PIMCO 8/ 10/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/11/2005 1.0000 777,277.560 777,277.56 -777,277.56 0.00
99608524 70CSF07522202: LONG TERM 8/11/2005 OPER-PIMCO 8/ 11/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/11/2005 1.0000 1, 702,326.880 1, 702,326.88 -1, 702,326.88 0.00
9960852470CSF0751l102: LIQUID OPER-8/11/2005 PIM CO 8/11/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/12/2005 1.0000 1,349,457.460 1,349,457.46 -1,349,457.46 0.00
9960852470CSF07522202: LONG TERM 8/12/2005 OPER-PIMCO 8/12/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/15/2005 1.0000 54,018.440 54,018.44 -54,018.44 0.00
9960852470CSF07511102: LIQUID OPER-8/15/2005 PIMCO 8/15/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/16/2005 1.0000 11,494.590 11,494.59 -11,494.59 0.00
9960852470CSF07522202: LONG TERM 8/16/2005 OPER-PIMCO 8/16/2005
Workbench
.,, Actual Settle Date
10
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
B DREYFUS TREASURY CASH MGMTSEC ID: 8/16/2005 1.0000 859.450 859.45 -859.45 0.00
9960852470CSF07511102: LIQUID OPER-8/16/2005 PIMCO 8/16/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/17 /2005 1.0000 835.610 835.61 -835.61 0.00
9960852470CSF07511102: LIQUID OPER-8/17/2005
PIMCO 8/17/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/17/2005 1.0000 1, 191,896.670 1, 191,896.67 -1, 191,896.67 0.00
99608524 70CSF07522202: LONG TERM 8/17/2005 OPER-PIMCO 8/17/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/18/2005 l.0000 839.950 839.95 -839.95 0.00
9960852470CSF07511102: LIQUID OPER-8/18/2005 PIMCO 8/18/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/19/2005 1.0000 1,065.090 1,065.09 -1,065.09 0.00
9960852470CSF0751l102: LIQUID OPER-8/19/2005 PIMCO 8/19/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/22/2005 l.0000 2,345.470 2,345.47 -2,345.47 0.00
9960852470CSF0751l102: LIQUID OPER-8/22/2005
PIM CO 8/22/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/23/2005 1.0000 11,005.000 11,005.00 -11,005.00 0.00
9960852470CSF0751l102: LIQUID OPER-8/23/2005
PIMCO 8/23/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/24/2005 1.0000 1, 102 ,386.050 l, l 02 ,386.05 -1, 102,386.05 0.00
9960852470CSF07522202: LONG TERM 8/24/2005 OPER-PIMCO 8/24/2005
------·-----
Workbench
·•Actual Settle Date 11
Transaction Detail Report ID: EWBA09
I OCSD·CONSOLIDATED -OCSGOOOlOOOO
Reported by Transaction Category Base Currency: USD
8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/24/2005 1.0000 536, 922. 1 70 536,922.17 -536,922.17 0.00
9960852470CSF07511102: LIQUID OPER-8/24/2005 PIM CO 8/24/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/25/2005 1.0000 1,257,650.370 1,257,650.37 -1,257,650.37 0.00
99608524 70CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/29/2005 1.0000 1,287.000 1,287.00 -1,287.00 0.00
9960852470CSF07511102: LIQUID OPER-8/29/2005 PIM CO 8/29/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/29/2005 1.0000 26,959.390 26,959.39 ·26,959.39 0.00
99608524 70CSF07522202: LONG TERM 8/29/2005 OPER-PIMCO 8/29/2005
B DREYFUS TREASURY CASH MGMTSEC ID: 8/30/2005 1.0000 21,634.470 21,634.47 -21,634.47 0.00
9960852470CSF0751l102: LIQUID OPER-8/30/2005 PIM CO 8/30/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/31/2005 1.0000 308.440 308.44 -308.44 0.00
9960852470CSF07511102: LIQUID OPER-8/31/2005 PIM CO 8/31/2005
8 DREYFUS TREASURY CASH MGMTSEC ID: 8/31/2005 1.0000 181,092.200 181,092.20 -181,092.20 0.00
9960852470CSF07522202: LONG TERM 8/31/2005 OPER-PIMCO 8/31/2005
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR: 224,204,374.870 224,043,675.04 -224,043,675.04 o.oo
Workbenc11
k Actual Settle Date
12
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Tran
Type Description
Transaction Detail
Reported by Transaction Category
8/1/2005-8/31/2005
Trade Date
Settle Date
Reported Date
Local Price
Base Price
Base Ex Rate Shares/Par
Cost
Base
TOTAL CASH & CASH EQUIVALENTS BASE: 224,204,374.870 224,043,675.04
FIXED INCOME SECURITIES
U.S. DOLLAR
B CIT GROUP INC GLOBAL SR NT 4.125% 8/23/2005
02/21/2006 DD 02/20/03SEC ID: 8/26/2005 125577AN6BROKER: JEFFERIES & CO INC, 8/23/2005 NEW YORKOCSF07511102: LIQUID OPER-
PIMCO
IB CIT GROUP INC GLOBAL SR NT 4.125% 8/23/2005
02/21/2006 DD 02/20/03SEC ID: 8/26/2005 125577AN6BROKER: JEFFERIES & CO INC, 8/23/2005 NEW YORKOCSF07511102: LIQUID OPER-
PIMCO
B FNMA POOL #0735856 5.000% 6/22/2005
08/01/2020 DD 08/0l/05SEC ID: 8/16/2005
31402RQH5BROKER: BARCLAYS CAPITAL 8/ l/2005
INC, NEW YORKOCSF07522202: LONG TERM B/ l 8/'J005 *
OPER-PIMCO -
18 FNMA POOL #0735856 5.000% 6/22/2005
08/01/2020 DD 08/01/05SEC ID: 8/16/2005
31402RQH5BROKER: BARCLAYS CAPITAL 8/1/2005
INC, NEW YORKOCSF07522202: LONG TERM B/ 1812005 .,,
OPER-PIMCO
B HOUSEHOLD FIN CORP NT 7.250% 8/1/2005
05/15/2006 DD 05/ 15/96SEC ID: 8/4/2005 441812FT6BROKER: FIRST TENNESSEE BK 8/1/2005 NA-BOND DIV, MEMPHISOCSF0751l102:
LIQUID OPER-PIMCO
18 HOUSEHOLD FIN CORP NT 7.250% 8/1/2005
05/ 15/2006 DD 05/ 15/96SEC ID: 8/4/2005 4418 l 2FT6BROKER: FIRST TENNESSEE BK 8/1/2005 NA-BOND DIV, MEMPHISOCSF0751l102:
LIQUID OPER-PIMCO
·k Actual Settle Date
99.9640 500,000.000 499,820.00
99.9640 0.000 0.00
100.9688 500,000.000 504,843.75
100.9688 0.000 0.00
102.3240 500,000.000 511,620.00
102.3240 0.000 0.00
13
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
-224,043,675.04
-499,820.00
-343.75
-504,843.75
-1,041.67
-511,620.00
-7,954.86
Net Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Workbench
Transaction Detail Report ID: EWBA09
I Reported by Transaction Category Base Currency: USD I 8/ 1/2005 -8/31/2005 I OCSD-CONSOLIDATED. OCSGOOOlOOOO Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
8 SALOMON SMITH MTN # SR 00206 VAR RT 8/23/2005 100.3702 2,300,000.000 2,308,514.60 -2,308,514.60 0.00
05/ 18/2007 DD 05/28/02SEC ID: 8/26/2005 79548EJP8BROKER: CITIGROUP GBL
MKTS/SALOMON, NEW YORKOCSF07522202: 8f 23/2005
LONG TERM OPER-PIMCO
18 SALOMON SMITH MTN # SR 00206 VAR RT 8/23/2005 100.3702 0.000 0.00 -13,432.34 0.00
05/ 18/2007 DD 05/28/02SEC ID: 8/26/2005 79548EJP8BROKER: CITIGROUP GBL
MKTS/SALOMON, NEW YORKOCSF07522202: 8/23/2oo5
LONG TERM OPER-PIMCO
8 U S TREASURY NOTES 05. 750% 11/15/2005 8/2/2005 100.5370 l ,000,000.000 1,005,369.90 -1,005,369.90 0.00
DD 11/ 15/00SEC ID: 9128276N7BROKER: 8/ 17 /2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 8/2/2005
LONG TERM OPER-PIMCO
18 US TREASURY NOTES 05.750% 11/ 15/2005 8/2/2005 100.5370 0.000 0.00 -14,687.50 0.00
DD 11/15/00SEC ID: 9128276N78ROKER: 8/ 17 /2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 8/2/2005
LONG TERM OPER-PIMCO
8 US TREASURY NOTES 4.250% 08/ 15/2013 8/2/2005 99.8232 2, I 00,000.000 2,096,288.10 -2,096,288.10 0.00
DD 08f15/03SEC ID: 912828BH28ROKER: 8/15/2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 8/2/2005
LONG TERM OPER-PIMCO
B US TREASURY NOTES 4.250% 08/ 15/2013 8/12/2005 100.1180 2, 100,000.000 2,102,478.74 -2,102,478.74 0.00
DD 08/ 15/03SEC ID: 912828BH2BROKER: 9/15/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/12/2005 LONG TERM OPER-PIMCO
18 US TREASURY NOTES 4.250% 08/ 15/2013 8/12/2005 100.1180 0.000 0.00 -7,518.34 0.00
DD 08/15/03SEC ID: 912828BH2BROKER: 9/15/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/12/2005 LONG TERM OPER-PIMCO
B US TREASURY NOTES 3.375% 12/ 15/2008 8/10/2005 97.4377 10,900,000.000 10,620, 707 .67 -10,620,707.67 0.00
DD 12/ 15/03SEC ID: 912828BT6BROKER: 8/17/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/10/2005 LONG TERM OPER-PIMCO
Workbench
*Actual Settle Date
14
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
18 US TREASURY NOTES 3.375% 12/ 15/2008 8/10/2005 97.4377 0.000 0.00 -63,322.74 0.00 DD 12/ 15/03SEC ID: 9128288T6BROKER: 8/17/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/10/2005 LONG TERM OPER-PIMCO
8 U S TREASURY NOTES 3.375% 12/ 15/2008 8/16/2005 97.8806 10,900,000.000 10,668,982.89 -10,668, 982.89 0.00 DD 12/ 15/03SEC ID: 912828BT6BROKER: 9/21/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ 16/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
18 US TREASURY NOTES 3.375% 12/ 15/2008 8/16/2005 97.8806 0.000 0.00 -98,502.05 0.00 DD 12/ 15/03SEC ID: 912828BT6BROKER: 9/21/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ 16/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
B US TREASURY NOTES 4.000% 03/ 15/2010 8/16/2005 99.5459 20, 700,000.000 20,605,997.78 -20,605,997.78 0.00 DD 03/ 15/05SEC ID: 912828DP2BROKER: 9/21/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/16/2005 LONG TERM OPER-PIMCO
18 US TREASURY NOTES 4.000% 03/ 15/2010 8/16/2005 99.5459 0.000 0.00 -13,723.76 0.00 DD 03/ 15/0SSEC ID: 912828DP28ROKER: 9/21/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/16/2005 LONG TERM OPER-PIMCO
8 US TREASURY NOTES 4.000% 03/ 15/2010 8/17/2005 99.4492 10,500,000.000 10,442, 167.97 -10,442, 167.97 0.00 DD 03/ 15/05SEC ID: 912828DP28ROKER: 8/18/2005
MORGAN STANLEY & CO INC, 8/ 17 /2005
NYOCSF07522202: LONG TERM OPER-PIMCO
18 US TREASURY NOTES 4.000% 03/ 15/2010 8/17/2005 99.4492 0.000 0.00 -178,043.48 0.00 DD 03/ 15/05SEC ID: 912828DP28ROKER: 8/18/2005
MORGAN STANLEY & CO INC, 8/17/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
B US TREASURY NOTES 4.000% 03/ 15/2010 8/18/2005 99.5520 10,500,000.000 10,452,958. 74 -10,452,958.74 0.00 DD 03/ 15/05SEC ID: 912828DP2BROKER: 9/21/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ l8/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
Workbe11cl1
k Actual Settle Date 15
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
18 US TREASURY NOTES 4.000% 03/ 15/2010 8/18/2005 99.5520 0.000 0.00 -6,961.32 0.00
DD 03/ 15/05SEC ID: 912828DP2BROKER: 9/21/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/18/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
8 us TREASURY NOTES 3.750°/ii 03/31/2007 8/16/2005 99.6053 11,200,000.000 l I, 155, 796.85 -11, 155, 796.85 0.00
DD 03/31/05SEC ID: 912828DQOBROKER: 9/21/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ l6/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
18 US TREASURY NOTES 3. 750% 03/31/2007 8/ 16/2005 99.6053 0.000 0.00 -199,672.13 0.00
DD 03/31/0SSEC ID: 912828DQOBROKER: 9/21/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ 16/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
8 US TREASURY NOTES 3.500% 05/31/2007 8/16/2005 99.1107 11,000,000.000 10,902, 179.20 -10,902, 179.20 0.00
DD 05/31/05SEC ID: 912828DW78ROKER: 9/21/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/16/2005 LONG TERM OPER-PIMCO
IB US TREASURY NOTES 3.500% 05/31/2007 8/16/2005 99.1107 0.000 0.00 -118,866.12 0.00
DD 05/31/05SEC ID: 912828DW7BROKER: 9/21/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/16/2005 LONG TERM OPER-PIMCO
B U S TREASURY NOTES 3.625% 06/30/2007 8/11/2005 99.1758 20,000,000.000 19,835, 156.25 -19,835, 156.25 0.00
DD 06/30/05SEC ID: 912828DY3BROKER: 8/12/2005 CHASE/GREENWICH CAP, NEW 8/11/2005 YORKOCSF07522202: LONG TERM OPER-
PIM CO
18 US TREASURY NOTES 3.625% 06/30/2007 8/11/2005 99.1758 0.000 0.00 -84,714.67 0.00
DD 06/30/05SEC ID: 912828DY3BROKER: 8/12/2005 CHASE/GREENWICH CAP, NEW 8/11/2005 YORKOCSF07522202: LONG TERM OPER-
PIM CO
B US TREASURY NOTES 3.625% 06/30/2007 8/30/2005 99.3676 9,500,000.000 9,439,922.95 -9,439,922.95 0.00
DD 06/30/05SEC ID: 912828DY3BROKER: 9/21/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/30/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
Workbench
k Actual Settle Date
16
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/ 1/2005 -8/31/2005
Tran
Type Description
Trade Date
Settle Date
Reported Date
18 U S TREASURY NOTES 3.625% 06/30/2007 8/30/2005
DD 06/30/05SEC ID: 912828DY3BROKER: 9/21/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/30/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
Local Price
Base Price
Base Ex Rate
99.3676
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR:
TOTAL FIXED INCOME SECURITIES BASE:
TOTAL PURCHASES BASE:
PAY UPS
FIXED INCOME SECURITIES
U.S. DOLLAR
PU US TREASURY INFLATION INDEX NT 3.375% 7 / 15/2005
01/15/2007 DD 01/15/97SEC ID: 7/15/2005
9128272M30CSF07522202: LONG TERM 8/ 1/2005
OPER-PIMCO 9/ 1/2005 *
PU US TREASURY INFLATION INDEX NT 3.625'Yo 7/15/2005
01/ 15/2008 DD 01/15/98SEC ID: 7 /15/2005
9128273T70CSF07522202: LONG TERM 8/ 1/2005
OPER-PIMCO 8/31/2005 *
PU US TREASURY INFLATION INDEX NT 3.875% 7/15/2005
01/15/2009 DD 01/15/99SEC ID: 7/15/2005
9128274Y50CSF07522202: LONG TERM 8/1/2005
OPER-PIMCO 8/31/2005 *
PU US TREASURY INFLATION INDEXED 2.000% 7/15/2005
01/15/2014 DD Ol/ 15/04SEC ID: 7/15/2005
9128288W90CSF07522202: LONG TERM 8/ 1/2005
OPER-PIMCO 8/31/2005 *
·• Actual Settle Date
100.0000
100.0000
100.0000
100.0000
17
Shares/Par
0.000
124,200,000.000
124,200,000.000
348,404,374.870
3.940.980
1,176.000
5,225.000
49.000
Cost
Base
0.00
123,152,805.39
123,152,805.39
347,196,480.43
3,940.98
1,176.00
5,225.00
49.00
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
-77,671.54
-124,039,261.66
-124,039,261.66
-348,082,936. 70
-3,940.98
-1,176.00
-5,225.00
-49.00
Net Gain/Loss
Base
0.00
o.oo
0.00
o.oo
0.00
0.00
0.00
0.00
Workbench
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/1/2005-8/31/2005
Tran
Type Description
Trade Date
Settle Date
Reported Date
Local Price
Base Price
Base Ex Rate
PU US TREASURY INFLATION INDEX NT 2.000%1 7/15/2005 100.0000
07I15/2014 DD 07I15/04SEC ID: 7I15/2005
912828CP30CSF07522202: LONG TERM 8/ l/2005
OPER-PIMCO 813112005 *
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR:
TOTAL FIXED INCOME SECURITIES BASE:
TOTAL PAY UPS BASE:
SALES
CASH & CASH EQUIVALENTS
U.S. DOLLAR
s
IS
FEDERAL HOME LN MTG CORP DISC MAT 8/3/2005
ll/01/2005SECID:313397NS6BROKE~ 8/3/2005
CREDIT SUISSE, NEW YORKOCSF07522202:
LONG TERM OPER-PIMCO 8/3/2005
FEDERAL HOME LN MTG CORP DISC MAT 8/3/2005
l l/Ol/2005SEC ID: 313397NS6BROKER: 8/3/2005
CREDIT SUISSE, NEW YORKOCSF07522202: 81312005 LONG TERM OPER-PIMCO
99.0083
99.0083
Shares/Par
1,488.000
11,878.980
11,878.980
11,878.980
-100,000.000
0.000 .
Cost
Base
1,488.00
11,878.98
11,878.98
11,878.98
-99,008.33
0.00
s FED HOME LN MTG CORP DISC NTS MAT
11/ 15/2005SEC ID: 313397PGOBROKER:
8/17/2005
8/17/2005
8/17/2005
99.0749 -2,300,000.000 -2,278,722.44
IS
CHASE SECURITIES, NEW
YORKOCSF07522202: LONG TERM OPER-
PIMCO
FED HOME LN MTG CORP DISC NTS MAT
11/ 15/2005SEC ID: 313397PGOBROKER:
CHASE SECURITIES, NEW
YORKOCSF07522202: LONG TERM OPER-
PIMCO
·k Actual Settle Date
8/17/2005
8/17/2005
8/17/2005
99.0749
18
0.000 0.00
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
-1,488.00
-11,878.98
-11,878.98
-11,878.98
99,008.33
121.67
2,278, 722.44
865.06
Net Gain/Loss
Base
0.00
o.oo
o.oo
0.00
0.00
0.00
0.00
0.00
Workbench
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOIOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
s FED HOME LN MTG CORP DISC NTS MAT 8/18/2005 99.0749 -400,000.000 -396,299.56 396,299.56 0.00 11/ 15/2005SEC ID: 313397PGOBROKER: 8/18/2005 CHASE SECURITIES, NEW 8/18/2005 YORKOCSF07522202: LONG TERM OPER-
PIM CO
IS FED HOME LN MTG CORP DISC NTS MAT 8/18/2005 99.0749 0.000 0.00 150.33 0.00 11/15/2005SEC ID: 313397PGOBROKER: 8/18/2005 CHASE SECURITIES, NEW 8/18/2005 YORKOCSF07522202: LONG TERM OPER-
PIM CO
s FEDERAL HOME LN MTG CORP DISC MAT 8/3/2005 98.5540 -2,900,000.000 -2,858,066.80 2,858,066.80 0.00 12/ 12/2005SEC ID: 313397QKOBROKER: 8/3/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/3/2005 LONG TERM OPER-PIMCO
IS FEDERAL HOME LN MTG CORP DISC MAT 8/3/2005 98.5540 0.000 0.00 3,943.20 0.00 12/ 12/2005SEC ID: 313397QKOBROKER: 8/3/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/3/2005 LONG TERM OPER-PIMCO
s GENERAL ELEC CAP DISC 10/20/2005SEC 8/3/2005 99.1125 -3,600,000.000 -3,568,050.00 3,568,050.00 0.00 ID: 36959HXL6BROKER: MERRILL LYNCH 8/3/2005
PIERCE FENNER SMITH INC 8/3/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
IS GENERAL ELEC CAP DISC 10/20/2005SEC 8/3/2005 99.1125 0.000 0.00 4,104.00 0.00 ID: 36959HXL6BROKER: MERRILL LYNCH 8/3/2005
PIERCE FENNER SMITH INC 8/3/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
s GENERAL ELEC CAP DISC 10/20/2005SEC 8/11/2005 99.1125 -100 ,000.000 -99,112.50 99,112.50 0.00 ID: 36959HXL6BROKER: CREDIT SUISSE, 8/ 11/2005 NEW YORKOCSF07522202: LONG TERM 8/11/2005 OPER-PIMCO
IS GENERAL ELEC CAP DISC 10/20/2005SEC 8/11/2005 99.1125 0.000 0.00 185.56 0.00 ID: 36959HXL6BROKER: CREDIT SUISSE, 8/ 11/2005 NEW YORKOCSF07522202: LONG TERM 8/11/2005 OPER-PIMCO
Workbench
• Actual Settle Date 19
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
i OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
s CREDIT SUISSE FB REPO 03.210% 8/1/2005 100.0000 -7,800,000.000 -7,800,000.00 7,800,000.00 0.00
08/01/2005 DD 07 /29/05SEC ID: 8/1/2005 99438T225BROKER: CREDIT SUISSE, NEW 8/1/2005 YORKOCSF0751l102: LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 03.210% 8/1/2005 100.0000 0.000 0.00 2,086.50 0.00
08/01/2005 DD 07/29/05SEC ID: 8/1/2005 99438T225BROKER: CREDIT SUISSE, NEW 8/1/2005 YORKOCSF075 l l l 02: LIQUID OPER-PIMCO
s LEHMAN CAT I REPO REPO 03.240% 8/2/2005 100.0000 -7,800,000.000 -7 ,800,000.00 7 ,800,000.00 0.00
08/02/2005 DD 08/01/05SEC ID: 8/2/2005 99438U669BROKER: LEHMAN GOVT SECS
INC, NYOCSF075ll102: LIQUID OPER-PIMCO 8f 2/2005
IS LEHMAN CAT I REPO REPO 03.240% 8/2/2005 100.0000 0.000 0.00 702.00 0.00
08/02/2005 DD 08/0l/05SEC ID: 8/2/2005 99438U669BROKER: LEHMAN GOVT SECS
INC, NYOCSF075ll102: LIQUID OPER-PIMCO 8f 2f 2005
s LEHMAN CAT 2 REPO 03.170% 08/03/2005 8/3/2005 100.0000 -7,800,000.000 -7,800,000.00 7,800,000.00 0.00
DD 08/02/05SEC ID: 99438W475BR9KER: 8/3/2005
LEHMAN GOVT SECS INC, NYOCSF01511102: 81312005 LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.170% 08/03/2005 8/3/2005 100.0000 0.000 0.00 686.83 0.00
DD 08/02/05SEC ID: 99438W475BROKER: 8/3/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 81312005 LIQUID OPER-PIMCO
s CS FOB CAT 2 REPO REPO 03.100% 8/4/2005 100.0000 -5,800,000.000 -5,800,000.00 5,800,000.00 0.00
08/04/2005 DD 08/03/0SSEC ID: 8/4/2005 99438Y083BROKER: CREDIT SUISSE, NEW 8/4/2005 YORKOCSF0751l102: LIQUID OPER-PIMCO
IS CS FOB CAT 2 REPO REPO 03.100% 8/4/2005 100.0000 0.000 0.00 499.44 0.00
08/04/2005 DD 08/03/0SSEC ID: 8/4/2005 99438Y083BROKER: CREDIT SUISSE, NEW 8/4/2005 YORKOCSF07511102: LIQUID OPER-PIMCO
Workbenc11
·~ Actual Settle Date
20
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/ l/2005 -8/31/2005
Tran
Type Description
Trade Date
Settle Date
Reported Date
s
IS
s
IS
s
IS
s
IS
LEHMAN CAT I REPO REPO 03.120% 8/4/2005
08/04/2005 DD 08/03/0SSEC ID: 8/4/2005
99438Yl74BROKER: LEHMAN GOVT SECS 8/4/2005
INC, NYOCSF075 l l 102: LIQUID OPER-PIMCO
LEHMAN CAT 1 REPO RI-::PO 03.120% 8/4/2005
08/04/2005 DD 08/03/0SSEC ID: 8/4/2005
99438Y 174BROKER: LEHMAN GOVT SECS 8/4/2005
INC, NYOCSF075 l 1102: LIQUID OPER-PIMCO
LEHMAN CAT 1 REPO REPO 03.260% 8/5/2005
08/05/2005 DD 08/04/05SEC ID: 8/5/2005
99438Z676BROKER: LEHMAN GOVT SECS 8/5/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
LEHMAN CAT 1 REPO REPO 03.260% 8/5/2005
08/05/2005 DD 08/04/0SSEC ID: 8/5/2005
99438Z676BROKER: LEHMAN GOVT SECS 8/5/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
LEHMAN CAT 2 REPO 03.350% 08/08/2005 8/8/2005
DD 08/05/05SEC ID: 99439B298BROKER: 8/8/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 8/8/2005 LIQUID OPER-PIMCO
LEHMAN CAT 2 REPO 03.350% 08/08/2005 8/8/2005
DD 08/05/05SEC ID: 99439B298BROKER: 8/8/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 8/8/2005
LIQUID OPER-PIMCO
LEHMAN CAT 1 REPO REPO 03.430% 8/9/2005
08/09/2005 DD 08/08/05SEC ID: 8/9/2005
99439C908BROKER: LEHMAN GOVT SECS 8/9/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
LEHMAN CAT 1 REPO REPO 03.430% 8/9/2005
08/09/2005 DD 08/08/05SEC ID: 8/9/2005
99439C908BROKER: LEHMAN GOVT SECS 8/9/2005
INC, NYOCSF0751l102: LIQUID OPER-PIMCO
* Actual Settle Date
Local Price
Base Price
Base Ex Rate
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
21
Shares/Par
-1,300,000.000
0.000
-7,800,000.000
0.000
-7,800,000.000
0.000
-7,800,000.000
0.000
Cost
Base
-1,300,000.00
0.00
-7,800,000.00
0.00
-7,800,000.00
0.00
-7,800,000.00
0.00
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
Net Gain/Loss
Base
1,300,000.00 0.00
112.67 0.00
7,800,000.00 0.00
706.33 0.00
7,800,000.00 0.00
2,177.50 0.00
7,800,000.00 0.00
743.17 0.00
Workbenc11
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ 1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
s LEHMAN CAT 2 REPO 03.350'Jlo 08/ 10/2005 8/10/2005 100.0000 -7,800,000.000 -7 ,800,000.00 7 ,800,000.00 0.00
DD 08/09/05SEC ID: 99439E714BROKER: 8/10/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ l0/2005
LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.350°/ii 08/ 10/2005 8/10/2005 100.0000 0.000 0.00 725.83 0.00
DD 08/09/05SEC ID: 99439E7148ROKER: 8/10/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ l0/2005
LIQUID OPER-PIMCO
s LEHMAN CAT 2 REPO 03.320% 08/ 11 /2005 8/11/2005 100.0000 -7 ,800,000.000 -7,800,000.00 7,800,000.00 0.00
DD 08/10/05SEC ID: 99439G321BROKER: 8/11/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 81 l l/2005
LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.320% 08/ 11 /2005 8/11/2005 100.0000 0.000 0.00 719.33 0.00
DD 08/ 10/05SEC ID: 99439G321BROKER: 8/ 11 /2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ l l/2005
LIQUID OPER-PIMCO
s LEHMAN CAT I REPO REPO 03.370% 8/12/2005 100.0000 -7,800,000.000 -7,800,000.00 7,800,000.00 0.00
08/12/2005 DD 08/11/05SEC ID: 8/12/2005 99439H980BROKER: LEHMAN GOVT SECS
INC, NYOCSF0751l102: LIQUID OPER-PIMCO 8/ 12f2005
IS LEHMAN CAT 1 REPO REPO 03.370% 8/12/2005 100.0000 0.000 0.00 730.17 0.00
08/ 12/2005 DD 08/ l l/05SEC ID: 8/12/2005 99439H980BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8f l 2/2005
s LEHMAN CAT 2 REPO 03.430% 08/ 15/2005 8/15/2005 100.0000 -7,800,000.000 -7,800,000.00 7 ,800,000. 00 0.00
DD 08/ 12/05SEC ID: 99439K520BROKER: 8/ 15/2005
LEHMAN GOVT SECS INC, NYOCSF075 l l 102: 8/ 1512005 LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.430% 08/ 15/2005 8/15/2005 100.0000 0.000 0.00 2,229.50 0.00
DD 08/ 12/0SSEC ID: 99439K520BROKER: 8/ 15/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/lS/2005 LIQUID OPER-PIMCO
Workbencll
• Actual Settle Date
22
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD·CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
s LEHMAN CAT 2 REPO 03.490% 08/ 16/2005 8/16/2005 100.0000 -7,800,000.000 -7,800,000.00 7,800,000.00 0.00 DD 08/15/05SEC ID: 99439M 187BROKER: 8/ 16/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ 16/2005
LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.490% 08/ 16/2005 8/16/2005 100.0000 0.000 0.00 756.17 0.00 DD 08/15/0SSEC ID: 99439M187BROKER: 8/16/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 8/ 16/2005
LIQUID OPER-PIMCO
s LEHMAN CAT 2 REPO 03.380% 08/ 17 /2005 8/17/2005 100.0000 -7 ,800,000.000 -7,800,000.00 7,800,000.00 0.00 DD 08/ 16/0SSEC ID: 99439N763BROKER: 8/ 17 /2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 8/ 17 /2005
LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.380% 08/ 17 /2005 8/17/2005 100.0000 0.000 0.00 732.33 0.00 DD 08/ 16/05SEC ID: 99439N763BROKER: 8/ 17 /2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 8/ 17 /2005
LIQUID OPER-PIMCO
s LEHMAN CAT 2 REPO 03.400% 08/ 18/2005 8/18/2005 100.0000 -7,800,000.000 -7 ,800,000.00 7,800,000.00 0.00 DD 08/ 17 /OSSEC ID: 99439Q337BROKER: 8/18/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 8/ 18/2005
LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.400% 08/ 18/2005 8/18/2005 100.0000 0.000 0.00 736.67 0.00 DD 08/ 17 /05SEC ID: 99439Q337BROKER: 8/ 18/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/ 18/2005
LIQUID OPER-PIMCO
s LEHMAN CAT 1 REPO REPO 03.490% 8/19/2005 100.0000 -7,800,000.000 -7 ,800,000.00 7,800,000.00 0.00 08/ 19/2005 DD 08/ 18/0SSEC ID: 8/19/2005 99439R921BROKER: LEHMAN GOVT SECS 8/ 19/2005
INC, NYOCSF0751l102: LIQUID OPER-PIMCO
IS LEHMAN CAT 1 REPO REPO 03.490% 8/19/2005 100.0000 0.000 0.00 756.17 0.00 08/ 19/2005 DD 08/18/05SEC ID: 8/19/2005
99439R921BROKER: LEHMAN GOVT SECS 8/19/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
---------
Workbenc11
·• Actual Settle Date 23
I I I OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/ 1/2005 -8/31/2005
s
s
IS
IS
s
IS
s
IS
Tran
Type Description
Trade Date
Settle Date
Reported Date
LEHMAN CAT 1 REPO REPO 03.450% 8/22/2005
08/22/2005 DD 08/ 19/0SSEC ID: 8/22/2005
99439T4488ROKER: LEHMAN GOVT SECS 812 /?
INC, NYOCSF0751l102: LIQUID OPER-PIMCO 2 -005
LEHMAN CAT 1 REPO REPO 03.450% 8/22/2005
08/22/2005 DD 08/ 19/05SEC ID: 8/22/2005
99439T448BROKER: LEHMAN GOVT SECS
INC, NYOCSF07522202: LONG TERM OPER-8122/2oo5
PIMCO
LEHMAN CAT 1 REPO REPO 03.450°/i> 8/22/2005
08/22/2005 DD 08/19/05SEC ID: 8/22/2005
99439T448BROKER: LEHMAN GOVT SECS
INC, NYOCSF07522202: LONG TERM OPER-8122/2oo5
PIMCO
LEHMAN CAT 1 REPO REPO 03.450% 8/22/2005
08/22/2005 DD 08/19/0SSEC ID: 8/22/2005
99439T448BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8f 22/2005
CREDIT SUISSE FB REPO 03.450%
08/23/2005 DD 08/22/0SSEC ID:
99439T844BROKER: CREDIT SUISSE, NEW
YORKOCSF07522202: LONG TERM OPER-
PIMCO
CREDIT SUISSE FB REPO 03.450%
08/23/2005 DD 08/22/0SSEC ID:
99439T844BROKER: CREDIT SUISSE, NEW
YORKOCSF07522202: LONG TERM OPER-
PIMCO
8/23/2005
8/23/2005
8/23/2005
8/23/2005
8/23/2005
8/23/2005
LEHMAN CAT 1 REPO REPO 03.450% 8/23/2005
08/23/2005 DD 08/22/05SEC ID: 8/23/2005
99439V005BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8f 23/2005
LEHMAN CAT 1 REPO REPO 03.450% 8/23/2005
08/23/2005 DD 08/22/05SEC ID: 8/23/2005
99439V005BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8f 23f 2005
·k Actual Settle Date
Local Price
Base Price
Base Ex Rate
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
24
Shares/Par
-7,800,000.000
-900,000.000
0.000
0.000
-1,200,000.000
0.000
-7,800,000.000
0.000
Cost
Base
-7,800,000.00
-900,000.00
0.00
0.00
-1,200,000.00
0.00
-7,800,000.00
0.00
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
7,800,000.00
900,000.00
258.75
2,242.50
1,200,000.00
115.00
7,800,000.00
747.50
Net Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Workbench
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
i OCSD·CONSOLIDATED -OCSGOOOlOOOO I 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
s CS FOB CAT 2 REPO REPO 03.460'Yo 8/24/2005 100.0000 -1,300,000.000 -1,300,000.00 1,300,000.00 0.00 08/24/2005 DD 08/23/05SEC ID: 8/24/2005 99439W466BROKER: CREDIT SUISSE, NEW 8/24/2005 YORKOCSF07522202: LONG TERM OPER-
PIM CO
IS CS FOB CAT 2 REPO REPO 03.460% 8/24/2005 100.0000 0.000 0.00 124.94 0.00 08/24/2005 DD 08/23/0SSEC ID: 8/24/2005 99439W466BROKER: CREDIT SUISSE, NEW 8/24/2005 YORKOCSF07522202: LONG TERM OPER-
PIMCO
s LEHMAN CAT 2 REPO 03.460% 08/24/2005 8/24/2005 100.0000 -7,800,000.000 -7,800,000.00 7,800,000.00 0.00 DD 08/23/0SSEC ID: 99439W664BROKER: 8/24/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/24/2005
LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.460% 08/24/2005 8/24/2005 100.0000 0.000 0.00 749.67 0.00 DD 08/23/05SEC ID: 99439W664BROKER: 8/24/2005
LEHMAN GOVT SECS INC, NYOCSF0751l102: 8/24/2005
LIQUID OPER-PIMCO
s LEHMAN CAT 1 REPO REPO 03.450% 8/25/2005 100.0000 -4,300,000.000 -4,300,000.00 4,300,000.00 0.00 08/25/2005 DD 08/24/0SSEC ID: 8/25/2005
99439Y017BROKER: LEHMAN GOVT SECS 8/25/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
IS LEHMAN CAT I REPO REPO 03.450% 8/25/2005 100.0000 0.000 0.00 412.08 0.00 08/25/2005 DD 08/24/05SEC ID: 8/25/2005 99439Y017BROKER: LEHMAN GOVT SECS 8/25/2005
INC, NYOCSF07511 l 02: LIQUID OPER-PIMCO
s LEHMAN CAT 1 REPO REPO 03.480% 8/26/2005 100.0000 -4,400,000.000 -4,400,000.00 4,400,000.00 0.00 08/26/2005 DD 08/25/0SSEC ID: 8/26/2005 99439Z626BROKER: LEHMAN GOVT SECS 8/26/2005
INC, NYOCSF0751l102: LIQUID OPER-PIMCO
IS LEHMAN CAT 1 REPO REPO 03.480% 8/26/2005 100.0000 0.000 0.00 425.33 0.00 08/26/2005 DD 08/25/0SSEC ID: 8/26/2005 99439Z626BROKER: LEHMAN GOVT SECS 8/26/2005
INC, NYOCSF075 l l l 02: LIQUID OPER-PIMCO
Workbench
·k Actual Settle Date 25
OCSD-CONSOLIDATED • OCSGOOOlOOOO
I Tran
Transaction Detail
Reported by Transaction Category
8/ l/2005 -8/31/2005
j Type Description
Trade Date
Settle Date
Reported Date
s
s
s
DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF07511102: LIQUID OPER-
PIMCO
DREYFUS TREASURY CASH MGMTSEC ID:
99608524 70CSF07522202: LONG TERM
OPER-PIMCO
DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF07511102: LIQUID OPER-
PIMCO
8/25/2005
8/25/2005
8/25/2005
8/26/2005
8/26/2005
8/26/2005
8/26/2005
8/26/2005
8/26/2005
Local Price
Base Price
Base Ex Rate
1.0000
1.0000
1.0000
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR:
s
TOTAL CASH & CASH EQUIVALENTS BASE:
FIXED INCOME SECURITIES
U.S. DOLLAR
us TREASURY NOTES 06.2501Y.102/15/2007 8/ 11/2005
DD 02/ 15/97SEC ID: 9128272JOBROKER: 8/ 12/2005
GOLDMAN SACHS & CO, NYOCSF07522202: 8/ l l/2005
LONG TERM OPER-PIMCO
IS US TREASURY NOTES 06.250% 02/ 15/2007 8/ l 1 /2005
DD 02/ 15/97SEC ID: 9128272JOBROKER: 8/ 12/2005
GOLDMAN SACHS & CO, NYOCSF07522202: 8/ l l/2005
LONG TERM OPER-PIMCO
s US TREASURY NOTES 05.750% 11/ 15/2005 8/2/2005
DD 11/ 15/00SEC ID: 9128276N7BROKER: 8/3/2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 81212005 LONG TERM OPER-PIMCO
• Actual Settle Date
103.2734
103.2734
100.6250
28
Shares/Par
-99,587.920
-2,321,946.940
-499, 738.420
-196,168,261.850
-196,168,261.850
-20,000,000.000
0.000
-1,000,000.000
Cost
Base
-99,587.92
-2,321,946.94
-499,738.42
-196,067,521.48
-196,067,521.48
-22,620,312.50
0.00
-1,099,525.42
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
99,587.92
2,321,946.94
499,738.42
196,099,093.34
196,099,093.34
20,654,687.50
614,640.88
1,006,250.00
Net Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
-1, 965,625.00
0.00
-93,275.42
-----·----·--
Workbenc11
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
I Tran
Trade Date Local Price
Settle Date Base Price Cost Amount Net Gain/Loss
I Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
s CS FOB CAT 2 REPO REPO 03.460cYo 8/24/2005 100.0000 -1,300,000.000 -1,300,000.00 1,300,000.00 0.00
08/24/2005 DD 08/23/05SEC ID: 8/24/2005 99439W466BROKER: CREDIT SUISSE, NEW 8/24/2005 YORKOCSF07522202: LONG TERM OPER-
PIMCO
IS CS FOB CAT 2 REPO REPO 03.460% 8/24/2005 100.0000 0.000 0.00 124.94 0.00
08/24/2005 DD 08/23/05SEC ID: 8/24/2005 99439W466BROKER: CREDIT SUISSE, NEW 8/24/2005 YORKOCSF07522202: LONG TERM OPER-
PJMCO
s LEHMAN CAT 2 REPO 03.460% 08/24/2005 8/24/2005 100.0000 -7,800,000.000 -7,800,000.00 7,800,000.00 0.00
DD 08/23/05SEC JD: 99439W664BROKER: 8/24/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8/24/2005
LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 03.460% 08/24/2005 8/24/2005 100.0000 0.000 0.00 749.67 0.00
DD 08/23/05SEC ID: 99439W664BROKER: 8/24/2005
LEHMAN GOVT SECS INC, NYOCSF07511102: 8124/2005
LIQUID OPER-PIMCO
s LEHMAN CAT 1 REPO REPO 03.450% 8/25/2005 100.0000 -4,300,000.000 -4,300,000.00 4,300,000.00 0.00
08/25/2005 DD 08/24/0SSEC ID: 8/25/2005
99439Y017BROKER: LEHMAN GOVT SECS 8/25/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
IS LEHMAN CAT 1 REPO REPO 03.450% 8/25/2005 100.0000 0.000 0.00 412.08 0.00
08/25/2005 DD 08/24/05SEC JD: 8/25/2005 99439Y017BROKER: LEHMAN GOVT SECS 8/25/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
s LEHMAN CAT I REPO REPO 03.480% 8/26/2005 100.0000 -4,400,000.000 -4,400,000.00 4,400,000.00 0.00
08/26/2005 DD 08/25/05SEC ID: 8/26/2005 99439Z626BROKER: LEHMAN GOVT SECS 8/26/2005
INC, NYOCSF0751l102: LIQUID OPER-PIMCO
IS LEHMAN CAT 1 REPO REPO 03.480% 8/26/2005 100.0000 0.000 0.00 425.33 0.00
08/26/2005 DD 08/25/05SEC JD: 8/26/2005 99439Z626BROKER: LEHMAN GOVT SECS 8/26/2005
INC, NYOCSF07511102: LIQUID OPER-PIMCO
Workbench
·k Actual Settle Date 25
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/ l/2005 -8/31/2005
Tran
Trade Date
Settle Date
Reported Date Type Description
s
IS
s
IS
s
IS
s
LEHMAN CAT 1 REPO REPO 03.510% 8/29/2005
08/29/2005 DD 08/26/05SEC ID: 8/29/2005
994408188BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8129f 2oo5
LEHMAN CAT 1 REPO REPO 03.510% 8/29/2005
08/29/2005 DD 08/26/05SEC ID: 8/29/2005
994408188BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8129f 2005
LEHMAN CAT 1 REPO REPO 03.520% 8/30/2005
08/30/2005 DD 08/29/05SEC ID: 8/30/2005
99440C889BROKER: LEHMAN GOVT SECS
INC, NYOCSF0751l102: LIQUID OPER-PIMCO 8/3o/2oo5
LEHMAN CAT 1 REPO REPO 03.520% 8/30/2005
08/30/2005 DD 08/29/05SEC ID: 8/30/2005
99440C889BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8/3o/2oo5
LEHMAN CAT 1 REPO REPO 03.470% 8/31/2005
08/31/2005 DD 08/30/05SEC ID: 8/31/2005
99440E323BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 3/3 l/2oo5
LEHMAN CAT 1 REPO REPO 03.470% 8/31/2005
08/31/2005 DD 08/30/05SEC ID: 8/31/2005
99440E323BROKER: LEHMAN GOVT SECS
INC, NYOCSF07511102: LIQUID OPER-PIMCO 8/3 l/2005
DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF07511102: LIQUID OPER-
PIMCO
8/2/2005
8/2/2005
8/2/2005
Local Price
Base Price
Base Ex Rate
100.0000
100.0000
100.0000
100.0000
100.0000
100.0000
1.0000
Shares/Par
-4,400,000.000
0.000
-4,400,000.000
0.000
-3,200,000.000
0.000
-2, 920,682.860
Cost
Base
-4,400,000.00
0.00
-4,400,000.00
0.00
-3,200,000.00
0.00
-2, 920,682.86
s DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF07522202: LONG TERM
OPER-PIMCO
8/4/2005
8/4/2005
8/4/2005
1.0000 -10,000,000.000 -10,000,000.00
·~Actual Settle Date 26
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
4,400,000.00
1,287.00
4,400,000.00
430.22
3,200,000.00
308.44
2,920,682.86
10,000,000.00
Net Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Workbench
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
s DREYFUS TREASURY CASH MGMTSEC ID: 8/4/2005 1.0000 -10,942.950 -10,942.95 10,942.95 0.00
9960852470CSF07511102: LIQUID OPER-8/4/2005 PIMCO 8/4/2005
s DREYFUS TREASURY CASH MGMTSEC ID: 8/10/2005 1.0000 -1,498,945. 730 -1,498,945.73 1,498, 945. 73 0.00
99608524 70CSF0751 I 102: LIQUID OPER-8/10/2005 PIMCO 8/10/2005
s DREYFUS TREASURY CASH MGMTSEC ID: 8/12/2005 1.0000 -1,798,967.330 -1, 798,967.33 1,798,967.33 0.00
9960852470CSF07511102: LIQUID OPER-8/12/2005 PIM CO 8/12/2005
s DREYFUS TREASURY CASH MGMTSEC ID: 8/15/2005 1.0000 -2,575,297.760 -2,575,297. 76 2,575,297.76 0.00
99608524 70CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/15/2005
s DREYFUS TREASURY CASH MGMTSEC ID: 8/18/2005 1.0000 -88,492.460 -88,492.46 88,492.46 0.00
9960852470CSF07522202: LONG TERM 8/18/2005 OPER-PIMCO 8/18/2005
s DREYFUS TREASURY CASH MGMTSEC ID: 8/19/2005 1.0000 -900,000.000 -900,000.00 900,000.00 0.00
99608524 70CSF07522202: LONG TERM 8/19/2005 OPER-PIMCO 8/19/2005
s DREYFUS TREASURY CASH MGMTSEC ID: 8/22/2005 1.0000 -182,680.420 -182,680.42 182,680.42 0.00
9960852470CSF07522202: LONG TERM 8/22/2005 OPER-PIMCO 8/22/2005
s DREYFUS TREASURY CASH MGMTSEC ID: 8/23/2005 1.0000 -70,979.060 -70,979.06 70,979.06 0.00
9960852470CSF07522202: LONG TERM 8/23/2005 OPER-PIMCO 8/23/2005
Workbench
•Actual Settle Date 27
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/ 1/2005 -8/31/2005
s
s
s
Tran
Type Description
Trade Date
Settle Date
Reported Date
DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF07511102: LIQUID OPER-
PIMCO
DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF07522202: LONG TERM
OPER-PIMCO
DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF07511102: LIQUID OPER-
PIMCO
8/25/2005
8/25/2005
8/25/2005
8/26/2005
8/26/2005
8/26/2005
8/26/2005
8/26/2005
8/26/2005
Local Price
Base Price
Base Ex Rate
1.0000
1.0000
1.0000
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR:
s
TOTAL CASH & CASH EQUIVALENTS BASE:
FIXED INCOME SECURITIES
U.S. DOLLAR
U S TREASURY NOTES 06.250% 02/ 15/2007 8/ 11 /2005
DD 02/ 15/97SEC ID: 9128272JOBROKER: 8/ 12/2005
GOLDMAN SACHS & CO, NYOCSF07522202: Bf l l/2005
LONG TERM OPER-PIMCO
IS US TREASURY NOTES 06.250% 02/ 15/2007 8/ 11 /2005
DD 02/ 15/97SEC ID: 9128272JOBROKER: 8/ 12/2005
GOLDMAN SACHS & CO, NYOCSF07522202: Bf l l/2005
LONG TERM OPER-PIMCO
s US TREASURY NOTES 05.750% 11/ 15/2005 8/2/2005
DD 11/ 15/00SEC ID: 9128276N78ROKER: 8/3/2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 8/2/2005 LONG TERM OPER-PIMCO
• Actual Settle Date
103.2734
103.2734
100.6250
28
Shares/Par
-99,587.920
-2,321,946.940
-499,738.420
-196,168,261.850
-196,168,261.850
-20,000,000.000
0.000
-1,000,000.000
Cost
Base
-99,587.92
-2,321,946.94
-499, 738.42
-196,067,521.48
-196,067,521.48
-22,620,312.50
0.00
-1,099,525.42
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
99,587.92
2,321,946.94
499,738.42
196,099,093.34
196,099,093.34
20,654,687.50
614,640.88
1,006,250.00
Net Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
• l, 965,625.00
0.00
-93,275.42
Workbenc/1
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IS US TREASURY NOTES 05.750% I I/ 15/2005 8/2/2005 100.6250 0.000 0.00 12,500.00 0.00
DD 11I15/00SEC ID: 9I28276N7BROKER: 8/3/2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 8/2/2005
LONG TERM OPER-PIMCO
s US TREASURY NOTES 4.250°/ci 08/ 15/2013 8/2/2005 99.8750 -2, 100,000.000 -2, 122,295. 78 2,097,375.00 -24,920.78
DD 08/15/03SEC ID: 912828BH2BROKER: 8/3/2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 8/2/2005
LONG TERM OPER-PIMCO
IS US TREASURY NOTES 4.250% 08/ I5/2013 8/2/2005 99.8750 0.000 0.00 41,666.44 0.00
DD 08/ 15/03SEC ID: 912828BH2BROKER: 8/3/2005
LEHMAN GOVT SECS INC, NYOCSF07522202: 8/2/2005
LONG TERM OPER-PIMCO
s US TREASURY NOTES 4.250% 08/ 15/2013 8/12/2005 100.2344 -2, 100,000.000 -2,122,295.77 2, 104,921.88 -17,373.89
DD 08/15/03SEC ID: 912828BH2BROKER: 8/15/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/12/2005 LONG TERM OPER-PIMCO
s US TREASURY NOTES 3.375% 12/ 15/2008 8/10/2005 97.4375 -10,900,000.000 -10,684, 196.02 10,620,687 .50 -63,508.52
DD 12/ 15/03SEC ID: 912828BT6BROKER: 8/11/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/10/2005 LONG TERM OPER-PIMCO
IS US TREASURY NOTES 3.375% 12/ 15/2008 8/10/2005 97.4375 0.000 0.00 57,292.00 0.00
DD 12/ 15/03SEC ID: 912828BT6BROKER: 8/11/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/10/2005 LONG TERM OPER-PIMCO
s US TREASURY NOTES 3.375% 12/ 15/2008 8/16/2005 97.8750 -10,900,000.000 -10,644,845.28 I 0,668,375.00 23,529.72
DD 12/15/03SEC ID: 9128288T6BROKER: 8/17/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/l6/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
IS US TREASURY NOTES 3.375% 12/15/2008 8/I6/2005 97.8750 0.000 0.00 63,322.75 0.00
DD 12/15/03SEC ID: 912828BT6BROKER: 8/17/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ l6/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
Workbench
·.• Actual Settle Date 29
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
s US TREASURY NOTES 2.375% 08/31/2006 8/31/2005 98.6055 -20,000,000.000 -19,898, 128.97 19,721,093.75 -177,035.22
DD 08/31/04SEC ID: 912828CU2BROKER: 9/1/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/31/2005 LONG TERM OPER-PIMCO
IS US TREASURY NOTES 2.375% 08/31/2006 8/31/2005 98.6055 0.000 0.00 1,312.15 0.00
DD 08/31/04SEC ID: 912828CU28ROKER: 9/1/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/31/2005 LONG TERM OPER-PIMCO
s US TREASURY NOTES 4.000% 03/ 15/2010 8/16/2005 99.5938 -20,700,000.000 -20,765,970.28 20,615,906.25 -150,064.03
DD 03/ 15/05SEC ID: 912828DP2BROKER: 8/17/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/16/2005 LONG TERM OPER-PIMCO
IS US TREASURY NOTES 4.0001Yo 03/ 15/2010 8/16/2005 99.5938 0.000 0.00 348,750.00 0.00
DD 03/ 15/05SEC ID: 912828DP2BROKER: 8/17/2005 GOLDMAN SACHS & CO, NYOCSF07522202: 8/16/2005 LONG TERM OPER-PIMCO
s US TREASURY NOTES 4.000% 03/ 15/2010 8/ 18/2005 99.5938 -10,500,000.000 -10,449,923.43 10,457,343. 75 7,420.32
DD 03/ 15/05SEC ID: 912828DP2BROKER: 8/ 18/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8118/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
IS US TREASURY NOTES 4.000% 03/ 15/2010 8/18/2005 99.5938 0.000 0.00 178,043.48 0.00
DD 03/ 15/05SEC ID: 912828DP2BROKER: 8/ 18/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ 18/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
s US TREASURY NOTES 3.750% 03/31/2007 8/16/2005 99.6250 -11,200,000.000 -11,166,717.52 11, 158,000.00 -8,717.52
DD 03/31/05SEC ID: 912828DQOBROKER: 8/ 17 /2005
MERRILL LYNCH PIERCE FENNER SMITH INC 811612005 NYOCSF07522202: LONG TERM OPER-PIMCO
IS US TREASURY NOTES 3.750% 03/31/2007 8/16/2005 99.6250 0.000 0.00 159,508.20 0.00
DD 03 I 31I05SEC ID: 912828DQOBROKER: 8 I 17 I 2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/ 16/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
Workbench
·Jr Actual Settle Date
30
OCSD-CONSOLIDATED • OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/1/2005 -8/31/2005
Tran
Type Description
Trade Date
Settle Date
Reported Date
s
IS
s
IS
US TREASURY NOTES 3.500% 05/31/2007 8/16/2005
DD 05/31/05SEC ID: 912828DW7BROKER: 8/17/2005
GOLDMAN SACHS & CO, NYOCSF07522202: 8/l6/2005
LONG TERM OPER-PIMCO
US TREASURY NOTES 3.500% 05/31/2007 8/16/2005
DD 05/31/05SEC ID: 912828DW78ROKER: 8/17/2005
GOLDMAN SACHS & CO, NYOCSF07522202: 8/ l6/2005
LONG TERM OPER-PIMCO
US TREASURY NOTES 3.625% 06/30/2007 8/30/2005
DD 06/30/05SEC ID: 912828DY3BROKER: 8/31/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/30/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
US TREASURY NOTES 3.625% 06/30/2007 8/30/2005
DD 06/30/05SEC ID: 912828DY3BROKER: 8/31/2005
MERRILL LYNCH PIERCE FENNER SMITH INC 8/30/2005
NYOCSF07522202: LONG TERM OPER-PIMCO
Local Price
Base Price
Base Ex Rate
99.1250
99.1250
99.3750
99.3750
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR:
TOTAL FIXED INCOME SECURITIES BASE:
PRINCIPAL PAYMENTS
FIXED INCOME SECURITIES
U.S. DOLLAR
TOTAL SALES BASE:
PD WMP/HUNTOON PAIGE #000-11150 7.500% 8/ 1/2005
12/01/2030 DD 10/21/99SEC ID: 8/ 1/2005
302998GE30CSF07522202: LONG TERM 8/ 1/2005
OPER-PIMCO 8/29/2005 *
* Actual Settle Date
100.0000
31
Shares/Par
-11,000,000.000
0.000
-9,500,000.000
0.000
-129,900,000.000
-129,900,000.000
-326,068,261.850
-884.330
Cost
Base
-10,927,852.54
0.00
-9,421,699.22
0.00
-131,923,762.73
-131,923,762.73
-327,991,284.21
-865.12
ReportlD: E\VBA09
Base Currency: USD
Status: FINAL
Amount
Base
10,903,750.00
82,049.18
9,440,625.00
58,019.70
131,066,120.41
131,066,120.41
327,165,213.75
884.33
Net Gain/Loss
Base
-24, 102.54
0.00
18,925.78
0.00
-2,474, 747.10
-2,474, 747.10
-2,474, 747.10
19.21
Workbenc11
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD·CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FHLMC MULTICLASS MTG SER E3 A VAR RT 8/1/2005 100.0000 -13, 104.100 -13,118.06 13,104.10 -13.96
08/ 15/2032 DD 12/01/97SEC ID: 8/1/2005 3133TCE950CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO
PD FHLMC GROUP #78-6064 6.384% 8/1/2005 100.0000 -205.290 -200.29 205.29 5.00
01/01/2028 DD 12/01/97SEC ID: 8/1/2005 31348SWZ30CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO
PD FNMA POOL #0254510 5.000% 8/1/2005 100.0000 -11,981.310 -12,340.75 11,981.31 -359.44
11/01/2017 DD 10/01/02SEC ID: 8/1/2005 31371KVB40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0254631 5.000% 8/1/2005 100.0000 -2,553.050 -2,629.64 2,553.05 -76.59
02/01/2018 DD 01/01/0JSEC ID: 8/1/2005 31371KY470CSF07522202: LONG TERM 8/1/2005 OPER-PlMCO 8/25/2005 *
PD FNMA POOL #0254760 5.000% 8/1/2005 100.0000 -2,367.040 -2,438.05 2,367.04 -71.01
06/01/2018 DD 05/0l/03SEC ID: 8/1/2005 31371K5V90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0254866 5.000% 8/1/2005 100.0000 -841.100 -866.33 841.10 -25.23
09/01/2018 DD 08/01/0JSEC ID: 8/1/2005 31371LCB30CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0254907 5.000% 8/1/2005 100.0000 -7,623.980 -7,623.98 7,623.98 0.00
10/01/2018 DD 09/01/03SEC ID: 8/1/2005 31371LDLOOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0254953 5.000% 8/1/2005 100.0000 -5,116.000 -5, 181.55 5, 116.00 -65.55
11/01/2018 DD 10/01/03SEC ID: 8/1/2005 31371LE210CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbench
* Actual Settle Date 32
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ 1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0254987 5.000% 8/1/2005 100.0000 -15,790.740 -15,993.06 15,790.74 ·202.32
12/01/2018 DD 11/01/03SEC ID: 8/1/2005 31371 LF460CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0323980 6.000% 8/1/2005 100.0000 -3,261.810 -3,405.53 3,261.81 -143.72
04/01/2014 DD 09/0l/99SEC ID: 8/1/2005 31374T2MOOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0357328 5.000% 8/1/2005 100.0000 -534.430 -550.46 534.43 -16.03
01/01/2018 DD Ol/01/03SEC ID: 8/1/2005 31376J4M80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0357430 5.000% 8/1/2005 100.0000 -17,007.000 -17,198.33 17,007.00 -191.33
09/01/2018 DD 09/01/03SEC ID: 8/1/2005 31376KA710CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0456482 6.000% 8/1/2005 100.0000 -376.200 -392.78 376.20 -16.58
02/01/2014 DD 02/0l/99SEC ID: 8/1/2005 31381CCT20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0509649 6.000% 8/1/2005 100.0000 -811.140 -846.88 811.14 -35.74
09/01/2014 DD 09/0l/99SEC ID: 8/1/2005 31383QEWOOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0535451 6.000% 8/1/2005 100.0000 -2,238.940 -2,337.59 2,238.94 -98.65
06/01/2015 DD 07 /01/00SEC ID: 8/1/2005 31384VZQ80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0555363 5.000% 8/1/2005 100.0000 -5,834.840 -6,009.89 5,834.84 -175.05
04/01/2018 DD 03/0l/03SEC ID: 8/1/2005 31385W5YlOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbench
·k Actual Settle Date 33
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0555453 5.000% 8/1/2005 100.0000 -532.750 -539.58 532.75 -6.83
05/01/2018 DD 04/01/03SEC ID: 8/1/2005 31385XBW60CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0555545 5.000% 8/1/2005 100.0000 -4,338.540 -4,468.70 4,338.54 -130.16
06/01/2018 DD 05/01/03SEC ID: 8/1/2005 31385XES20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0555621 5.000% 8/1/2005 100.0000 -12, 741.020 -12,884.36 12, 741.02 -143.34
07 /01/2018 DD 06/0l/03SEC ID: 8/1/2005 31385XG680CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0681309 5.000% 8/1/2005 100.0000 -6.024.270 -6,205.00 6,024.27 -180.73
02/01/2018 DD 02/01/03SEC ID: 8/1/2005 31391Y3S40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0681334 5.000% 8/1/2005 100.0000 -634.510 -653.55 634.51 -19.04
02/01/2018 DD 01/01/03SEC ID: 8/1/2005 31391Y4TlOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 ..
PD FNMA POOL #0684798 5.500% 8/1/2005 100.0000 -3,780.480 -3,777.23 3,780.48 3.25
03/01/2033 DD 03/01/03SEC ID: 8/1/2005 31400DX31 OCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0684908 5.000% 8/1/2005 100.0000 -7,699.850 -7,798.50 7,699.85 -98.65
06/01/2018 DD 05/01/03SEC ID: 8/1/2005 31400D3RlOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0685200 5.000% 8/1/2005 100.0000 -2,015.640 -2,041.47 2,015.64 -25.83
03/01/2018 DD 03/0l/03SEC ID: 8/1/2005 31400EGH70CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbench
... Actual Settle Date 34
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0685665 5.000'Yo 8/1/2005 100.0000 -380.940 -392.37 380.94 -11.43
02/01/2018 DD 02/0l/03SEC ID: 8/1/2005 31400EW220CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0686318 5.000% 8/1/2005 100.0000 -3,689.440 -3,800.12 3,689.44 -110.68
03/01/2018 DD 03/01/03SEC ID: 8/1/2005 31400FPB70CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0688739 5.000% 8/1/2005 100.0000 -1, 174.770 -1,210.01 1,174.77 -35.24
06/01/2018 DD 06/0l/03SEC ID: 8/1/2005 31400JEL90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0689859 5.000% 8/1/2005 100.0000 -399.210 -404.32 399.21 -5.11
05/01/2018 DD 05/01/03SEC ID: 8/1/2005 31400KMG80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0693834 5.000% 8/1/2005 100.0000 -11,821.890 -12,176.55 11,821.89 -354.66
03/01/2018 DD 03/01/03SEC ID: 8/1/2005 31400PY740CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0695852 5.000% 8/1/2005 100.0000 -3,706.090 -3,817.27 3,706.09 -111.18
05/01/2018 DD 05/01/03SEC ID: 8/1/2005 31400SBVOOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0695889 5.000% 8/1/2005 100.0000 -7,707.320 -7,938.54 7,707.32 -231.22
05/01/2018 DD 05/01/03SEC ID: 8/1/2005 31400SC230CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0697026 5.000% 8/1/2005 100.0000 -113.600 -117.01 113.60 -3.41
05/01/2018 DD 04/0l/03SEC ID: 8/1/2005 31400TLF20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbench
·k Actual Settle Date 35
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #07022 l 0 5.000% 8/1/2005 100.0000 -6,662.910 -6,862.80 6,662.91 -199.89
05/01/2018 DD 05/01/03SEC ID: 8/1/2005 31401ADP90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0702328 5.000% 8/1/2005 100.0000 -1,517.010 -1,536.45 1,517.01 -19.44
05/01/2018 DD 04/0l/03SEC ID: 8/1/2005 31401AHD20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0709148 5.000% 8/1/2005 100.0000 -6,630.190 -6,829.10 6,630.19 -198.91
06/01/2018 DD 06/0l/03SEC ID: 8/1/2005 31401HZM70CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0709360 5.000% 8/1/2005 100.0000 -8,842.250 -8,955.54 8,842.25 -113.29
07/01/2018 DD 06/0l/03SEC ID: 8/1/2005 31401JB560CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0709826 5.000% 8/1/2005 100.0000 -2,393.310 -2,423.97 2,393.31 -30.66
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401JSP40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0709917 5.000% 8/1/2005 100.0000 -3,602.550 -3,648.71 3,602.55 -46.16
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 3140IJVJ40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL ##0709963 5.000% 8/1/2005 100.0000 -80.330 -81.36 80.33 -1.03
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401JWYOOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0710235 5.000% 8/1/2005 100.0000 -10,290.060 -10,598.76 10,290.06 -308.70
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401 KBC80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbencl1
* Actual Settle Date 36
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD·CONSOLIDATED -OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0713344 5.000% 8/1/2005 100.0000 -60.770 -62.59 60.77 -1.82
06/01/2018 DD 06/0l/03SEC ID: 8/1/2005 31401NP520CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 >
PD FNMA POOL #0713365 5.000% 8/1/2005 100.0000 -4,763.210 -4,824.24 4,763.21 -61.03
07/01/2018 DD 07/0l/03SEC ID: 8/1/2005 31401NQS10CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005.
PD FNMA POOL #0720319 5.000% 8/1/2005 100.0000 -11,861.230 -12,013.20 11,861.23 -151.97
07 /01/2018 DD 07 /01/03SEC ID: 8/1/2005 31401 WG450CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0720369 5.000% 8/1/2005 100.0000 -10, 761.880 -11,084.74 10,761.88 -322.86
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401WJNOOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0721629 5.000% 8/1/2005 100.0000 -4,833.890 -4,978.91 4,833.89 -145.02
07/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401XVW40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0723487 5.000% 8/1/2005 100.0000 -1,020.450 -1,031.93 1,020.45 -11.48
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 3 l 402AXQ40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0725530 5.000% 8/1/2005 100.0000 -51,999.180 -52,706.04 51,999.18 -706.86
06/01/2019 DD 05/0l/04SEC ID: 8/1/2005 31402DA750CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0729601 5.000% 8/1/2005 100.0000 -3,386.020 -3,429.40 3,386.02 -43.38
07 /01/2018 DD 07 /01/03SEC ID: 8/1/2005 31402HRW30CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbenc11
* Actual Settle Date 37
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0732873 5.000% 8/1/2005 100.0000 -130.310 -131.98 130.31 -1.67
11/01/2018 DD 10/01/03SEC ID: 8/1/2005 31402MFN50CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0735227 5.5001Yo 8/1/2005 100.0000 -20,651.840 -20,826.09 20,651.84 -174.25
02/01/2035 DD 01/01/05SEC ID: 8/1/2005 31402QYYIOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0737130 5.000% 8/1/2005 100.0000 -39,032.280 -39,532.38 39,032.28 -500.10
10/01/2018 DD 10/01/03SEC ID: 8/1/2005 31402S4P90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0738211 5.000% 8/1/2005 100.0000 -3,331.270 -3,373.95 3,331.27 -42.68
10/01/2018 DD 10/01/03SEC ID: 8/1/2005 31402UDQ20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0738487 5.000% 8/1/2005 100.0000 -2,217.250 -2,245.66 2,217.25 -28.41
10/01/2018 DD 10/0l/03SEC ID: 8/1/2005 31402UNC20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL ##0740457 5.000% 8/1/2005 100.0000 -28,585.580 -28,974.17 28,585.58 -388.59
10/01/2018 DD 10/01/03SEC ID: 8/1/2005 31402WTN80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL ##0740471 5.000% 8/1/2005 100.0000 -2,965.570 -3,003.57 2,965.57 -38.00
10/01/2018 DD 10/01/03SEC ID: 8/1/2005 31402WT400CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL ##0740748 5.000% 8/1/2005 100.0000 -3,881.550 -3,931.28 3,881.55 -49.73
10/01/2018 DD l 1/0l/03SEC ID: 8/1/2005 31402W5H70CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbench
* Actual Settle Date 38
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0743868 5.000% 8/1/2005 100.0000 -602.440 -610.16 602.44 -7.72
11/01/2018 DD 10/01/03SEC ID: 8/1/2005 31403BMR10CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0744008 5.000% 8/1/2005 100.0000 -4,302.670 -4,357.80 4,302.67 -55.13
07/01/2018 DD 09/01/03SEC ID: 8/1/2005 31403BR540CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0744316 5.000% 8/1/2005 100.0000 -1.500.630 -1,519.86 1,500.63 -19.23
09/01/2018 DD 09/01/03SEC ID: 8/1/2005 3140383Z40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0747914 5.000% 8/1/2005 100.0000 -9,653.520 -9,777.21 9,653.52 -123.69
11/01/2018 DD 11/0I/03SEC ID: 8/1/2005 31403F3XOOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0748400 5.000% 8/1/2005 100.0000 -7,010.600 -7,100.42 7,010.60 -89.82
08/01/2018 DD 09/01/03SEC ID: 8/1/2005 31403GNR90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0748899 5.000% 8/1/2005 100.0000 -10, 195. 700 -10,326.33 10,195.70 -130.63
12/01/2018 DD 11/0l/03SEC ID: 8/ l/2005 31403G7WOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0750377 5.000% 8/ 1/2005 100.0000 -47,937.190 -48,551.39 47,937.19 -614.20
11/01/2018 DD 11/01/03SEC ID: 8/1/2005 3 l 403JUA20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0750380 5.000% 8/1/2005 100.0000 -44, 118.460 -44,683.73 44, 118.46 -565.27
11/01/2018 DD 11/01/03SEC ID: 8/1/2005 31403JUD60CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbench
*Actual Settle Date 39
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
I Tran
Trade Date Local Price
Settle Date Base Price Cost Amount Net Gain/Loss
I Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0750445 5.000% 8/1/2005 100.0000 -617.040 -624.95 617.04 -7.91
11/01/2018 DD 11/01/03SEC ID: 8/1/2005 3 l 403JWE20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0751960 5.000% 8/1/2005 100.0000 -8,672.080 -8,783.19 8,672.08 -111.11
12/01/2018 DD 11/01/03SEC ID: 8/1/2005 31403LMH10CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0753425 5.000% 8/1/2005 100.0000 -23,888. 750 -24,164.96 23,888.75 -276.21
11/01/2018 DD 11/01/03SEC ID: 8/1/2005 3 l 403NA230CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0755165 5.000% 8/1/2005 100.0000 -2,462.690 -2,494.24 2,462.69 -31.55
12/01/2018 DD 11/01/03SEC ID: 8/1/2005 31403Q6A30CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0756372 5.000% 8/1/2005 100.0000 -3,922.190 -3,967.54 3,922.19 -45.35
11/01/2018 DD 11/01/0JSEC ID: 8/1/2005 31403SJR80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0784251 5.000% 8/1/2005 100.0000 -94, 190.000 -95,470.40 94,190.00 -1,280.40
11/01/2019 DD 1 l/01/04SEC ID: 8/1/2005 3 l 405BH460CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0789670 5.000°/ii 8/1/2005 100.0000 -4,594.290 -4,656.74 4,594.29 -62.45
12/01/2019 DD 12/0l/04SEC ID: 8/1/2005 31405HJP40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO
8/25/2005 *
PD FNMA POOL #0792432 5.000% 8/1/2005 100.0000 -12,337.330 -12,505.04 12,337.33 -167.71
10/01/2019 DD 10/01/04SEC ID: 8/1/2005 31405LLM90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbench
* Actual Settle Date 40
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0792437 5.000% 8/1/2005 100.0000 -122, 138.270 -122, 138.27 122, 138.27 0.00
10/01/2019 DD 10/01/04SEC ID: 8/1/2005 31405LLS60CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0794195 5.000% 8/1/2005 100.0000 -3,575.380 -3,623.98 3,575.38 -48.60
11/01/2019 DD 11/01/04SEC ID: 8/1/2005 31405NKG90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0797160 5.000% 8/1/2005 100.0000 -108,812.820 -110,291.99 108,812.82 -1,479.17
12/01/2019 DD 12/01/04SEC ID: 8/1/2005 31405RTR70CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0797408 5.000% 8/1/2005 100.0000 -3,013.180 -3,054.14 3,013.18 -40.96
12/01/2019 DD 12/01/04SEC ID: 8/1/2005 31405R3R50CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0797414 5.000% 8/1/2005 100.0000 -3,821.620 -3,873.57 3,821.62 -51.95
12/01/2019 DD 12/0l/04SEC ID: 8/1/2005 3 l 405R3X20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0800370 5.000% 8/1/2005 100.0000 -1,471.200 -1,469.59 1,471.20 1.61
12/01/2019 DD 1 l/01/04SEC ID: 8/1/2005 31405VFK80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0800998 5.500% 8/1/2005 100.0000 -29,983.360 -29,957.59 29,983.36 25.77
11/01/2034 DD 11/01/04SEC ID: 8/1/2005 31405V3F20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0803923 5.000% 8/1/2005 100.0000 -12,179.770 -12,345.34 12, 179.77 -165.57
12/01/2019 DD 12/01/04SEC ID: 8/1/2005 3 l 406AD41 OCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbenc11
·~ Actual Settle Date 41
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSG00010000 8/ 1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0807711 5.000% 8/1/2005 100.0000 -12,760.220 -12,933.68 12,760.22 -173.46
01/01/2020 DD Ol/Ol/05SEC ID: 8/1/2005 3 l 406EKY90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0808933 5.500% 8/1/2005 100.0000 -329.460 -329.18 329.46 0.28
01/01/2035 DD Ol/01/05SEC ID: 8/1/2005 31406FV240CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0809350 5.500% 8/1/2005 100.0000 -7,083.100 -7,077.01 7,083.10 6.09
12/01/2034 DD 01 /01/05SEC ID: 8/1/2005 31406GEX30CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0814930 5.500% 8/1/2005 100.0000 -4,027.580 -4,024.12 4,027.58 3.46
04/01/2035 DD 04/01/05SEC ID: 8/1/2005 3 l 406NLK80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0815923 5.500% 8/1/2005 100.0000 -10,445.790 -10,436.81 10,445.79 8.98
03/01/2035 DD 03/0l/05SEC ID: 8/1/2005 3 l 406PPG80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 ..
PD FNMA POOL #0816246 5.000% 8/1/2005 100.0000 -2,663.880 -2,660.97 2,663.88 2.91
03/01/2020 DD 03/01/05SEC ID: 8/1/2005 31406PZK80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0819566 5.500% 8/1/2005 100.0000 -3,947.420 -3,944.03 3,947.42 3.39
04/01/2035 DD 04/01/05SEC ID: 8/1/2005 31406TQTIOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
PD FNMA POOL #0822731 5.500% 8/1/2005 100.0000 -353.190 -352.89 353.19 0.30
05/01/2035 DD 05/01/05SEC ID: 8/1/2005 31406XA850CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/2005 *
Workbenc11
·• Actual Settle Date 42
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD FNMA POOL #0823232 5.500% 8/1/2005 100.0000 -372.730 -372.41 372.73 0.32
06/01/2035 DD 05/0l/05SEC ID: 8/1/2005 3 l 406XSV50CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/25/ 2005 ~
PD FNMA POOL #0823787 5.000% 8/1/2005 100.0000 -7,622.220 -7,613.88 7,622.22 8.34
05/01/2020 DD 05/01/05SEC ID: 8/ 1/2005 3 l 406YF4 70CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/ 25/2005 ~
PD GNMA POOL #0421389 6.500% 8/1/2005 100.0000 -19.040 -19.98 19.04 -0.94
04/ 15/2026 DD 04/01/96SEC ID: 8/1/2005 36206UC230CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/15/2005 *
PD GNMA POOL #0449851 6.500% 8/1/2005 100.0000 -19.930 -20.92 19.93 -0.99
01/15/2028 DD 01/01/98SEC ID: 8/1/2005 36208FWLOOCSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/ 15/2005 *
PD GNMA POOL #0466845 6.500% 8/1/2005 100.0000 -48.680 -51.09 48.68 -2.41
06/15/2028 DD 06/01/98SEC ID: 8/1/2005 36209BTA60CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/ 15/2005"
PD GNMA POOL #0468052 6.500% 8/1/2005 100.0000 -69,386.460 -72,823.25 69,386.46 -3,436.79
07I15/2028 DD 07 /01/98SEC ID: 8/1/2005 36209C5M40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/ 15/2005 *
PD GNMA POOL #0476041 6.500% 8/1/2005 100.0000 -215.020 -225.33 215.02 -10.31
06/ 15/2028 DD 06/01/98SEC ID: 8/1/2005 36209MZE70CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/ 15/2005 *
PD GNMA POOL #0478626 6.500% 8/1/2005 100.0000 -190.930 -200.09 190.93 -9.16
01/ 15/2029 DD Ol/01/99SEC ID: 8/1/2005 36209QVT90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/ 15/2005 *
Workbench
* Actual Settle Date 43
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ 1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
PD GNMA POOL #0480598 6.500% 8/1/2005 100.0000 -40.870 -42.83 40.87 -1.96
10/15/2028 DD 10/01/98SEC ID: 8/1/2005 36209S3F60CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/] 5/2005 *
PD GNMA POOL #0512235 6.500% 8/1/2005 100.0000 -8.270 -8.68 8.27 -0.41
11/ 15/2029 DD 11 /Ol/99SEC ID: 8/1/2005 36211GBC60CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/ 15/2005 *
PD GNMA POOL #0514326 6.500% 8/1/2005 100.0000 -284.680 -298.34 284.68 -13.66
07/15/2029 DD 07/0l/99SEC ID: 8/1/2005 36211JLF20CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/ 15/2005 *
PD GNMA II POOL #0080023 VAR RT 12/20/20268/1/2005 100.0000 -2,804.070 -2,850.51 2,804.07 -46.44
DD 12/01/96SEC ID: 8/1/2005 36225CAZ90CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/22/2005.
PD GNMA II POOL #080088M 7.375% 8/1/2005 100.0000 -8,159.440 -8,337.93 8,159.44 -178.49
06/20/2027 DD 06/01 /97SEC ID: 8/1/2005 36225CC200CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/22/2005 *
PD GNMA II POOL #0080395 VAR RT 8/1/2005 100.0000 -6,004.640 -5,950.22 6,004.64 54.42
04/20/2030 DD 04/01/00SEC ID: 8/1/2005 36225CNM40CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/22/2005 *
PD GNMA II POOL #080408X VAR RT 8/1/2005 100.0000 -52,854.490 -52,317.69 52,854.49 536.80
05/20/2030 DD 05/01/00SEC ID: 8/1/2005 36225CN280CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/22/2005 *
PD GNMA II POOL #0080965 VAR RT 8/1/2005 100.0000 -37,532.440 -37,508.98 37,532.44 23.46
07 /20/2034 DD 07 /01/04SEC ID: 8/1/2005 36225DCB80CSF07522202: LONG TERM 8/1/2005 OPER-PIMCO 8/22/2005 *
Workbencl1
*Actual Settle Date 44
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/ 1/2005 -8/31/2005
Tran
Type Description
Trade Date
Settle Date
Reported Date
PD
PD
GNMA GTD REMIC TR 2000-9 FH VAR RT
02/ 16/2030SEC ID:
3837H4NX90CSF07522202: LONG TERM
OPER-PIMCO
RESIDENTIAL ASSET 03-RSl 1 AllB VAR RT
12/25/2033 DD 12/30/03SEC ID:
760985K830CSF07522202: LONG TERM
OPER-PIMCO
8/16/2005
8/16/2005
8/16/2005
8/25/2005
8/25/2005
8/25/2005
Local Price
Base Price
Base Ex Rate
100.0000
100.0000
PD SBA GTD PARTN CTFS SBIC-PS 01 6.640% 8/ 1/2005 100.0000
02/10/2011DD02/21/0lSEC ID: 8/1/2005
831641DD40CSF07522202: LONG TERM 8/1/2005
OPER-PIMCO BJ l0/2005 *
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR:
TOTAL FIXED INCOME SECURITIES BASE:
TOTAL PRINCIPAL PAYMENTS BASE:
MATURITIES
CASH & CASH EQUIVALENTS
U.S. DOLLAR
MT
MT
FEDERAL HOME LN BK CONS DISC N MAT
08/01/2005SEC ID:
313385JW70CSF0751l102: LIQUID OPER-
PIMCO
FEDERAL HOME LN BK CONS DISC N MAT
08/03/2005SEC ID:
313385JY30CSF0751l102: LIQUID OPER-
PIMCO
·k Actual Settle Date
8/1/2005
8/1/2005
8/1/2005
8/3/2005
8/3/2005
8/3/2005
100.0000
100.0000
45
Shares/Par
-10,119.210
-37,501.300
-4 79 '454 .480
-1,702,043.230
-1,702,043.230
-1, 702,043.230
-1, 900,000.000
-1,900,000.000
Cost
Base
-10,119.21
-37,501.30
-479,454.48
-1,717,133.93
-1,717,133.93
-1,717,133.93
-1,899,509.17
-1,899,833.75
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
10,119.21
37,501.30
479,454.48
1,702,043.23
1, 702,043.23
1, 702,043.23
1,899,509.17
1,899,833.75
Net Gain/Loss
Base
0.00
0.00
0.00
-15,090.70
-15,090.70
-15,090.70
0.00
0.00
Workbench
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
MT FEDEARL HOME LN BK CONS DISC N MAT 8/4/2005 100.0000 -2,600,000.000 ·2,599,776.83 2,599, 776.83 0.00
08/04/2005SEC ID: 8/4/2005 313385JZOOCSF07511102: LIQUID OPER-8/4/2005 PIM CO
MT FEDERAL HOME LN BK CONS DISC MAT 8/5/2005 100.0000 -2,300,000.000 -2,299,794.28 2,299, 794.28 0.00
8/5/2005SECID:313385KA30CSF07511102:8/5/2005
LIQUID OPER-PIMCO 8/5/2005
MT FEDERAL HOME LN BK CONS DISC N MAT 8/8/2005 100.0000 -400,000.000 -399,890.00 399,890.00 0.00
08/08/2005SEC ID: 8/8/2005 313385KD70CSF0751l102: LIQUID OPER-8/8/2005 PIM CO
MT FEDERAL HOME LN BK CONS DISC MAT 8/9/2005 100.0000 -700,000.000 -699,934.28 699,934.28 0.00
08/09/2005SEC ID: 8/9/2005 313385KESOCSF07511102: LIQUID OPER-8/9/2005 PIM CO
MT FEDERAL HOME LN BK CONS DISC N MAT 8/ 11/2005 100.0000 -800,000.000 -799,926.67 799,926.67 0.00
08/1 l/2005SEC ID: 8/11/2005 313385KGOOCSF07511102: LIQUID OPER-8/11/2005 PIM CO
MT FEDERAL HOME LN MTG CORP DISC MAT 8/9/2005 100.0000 -1,300,000.000 -1,290,180.66 1,290, 180.66 0.00
08/09/2005SEC ID: 8/9/2005 313397KEOOCSF07511102: LIQUID OPER-8/9/2005 PIM CO
MT FEDERAL NATL MTG ASSN DISC 8/1/2005 100.0000 -1,000,000.000 -988,461.67 988,461.67 0.00
08/0l/2005SEC ID: 8/1/2005 313589JW40CSF07511102: LIQUID OPER-8/1/2005 PIMCO
MT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/8/2005 100.0000 -1,200,000.000 -1,190,138.33 1,190,138.33 0.00
08/08/2005SEC ID: 8/8/2005 313589KD40CSF07511102: LIQUID OPER-8/8/2005 PIMCO
Workbencll
·k Actual Settle Date 46
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
MT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/9/2005 100.0000 -1,300,000.000 -1.299,877.94 1,299,877.94 0.00
08/09/2005SEC ID: 8/9/2005 313589KE20CSF07511102: LIQUID OPER-8/9/2005 PIM CO
MT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/10/2005 100.0000 -3,600,000.000 -3,580,433.44 3,580,433.44 0.00
08 / 10 / 2005SEC ID: 8/10/2005 313589KF90CSF07511102: LIQUID OPER-8/10/2005 PIM CO
MT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/11/2005 100.0000 -2,800,000.000 -2,799,744.89 2, 799, 744.89 0.00
8/ 1 l /2005SEC ID: 8/11/2005 313589KG70CSF07511102: LIQUID OPER-8/11/2005 PIM CO
MT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/12/2005 100.0000 -1, l 00,000.000 -1,099,899. 78 1,099,899. 78 0.00
08/12/2005SEC ID: 8/12/2005 313589KH50CSF0751l102: LIQUID OPER-8/12/2005 PIM CO
MT FEDERAL NATL MTG ASSN DISC NTS MAT 8/15/2005 100.0000 -1, l 00,000.000 -1,099,697.50 1,099,697.50 0.00
08/ 15/2005SEC ID: 8/15/2005 313589KL60CSF0751l102: LIQUID OPER-8/15/2005 PIM CO
MT FEDERAL NATL MTG ASSN DISC NT MAT 8/16/2005 100.0000 -l, 100,000.000 -1,099,898.56 1,099,898.56 0.00
08/ 16/2005SEC ID: 8/16/2005 313589KM40CSF07511102: LIQUID OPER-8/16/2005 PIM CO
MT FEDERAL NATL MTG ASSN DISC NTS MAT 8/17/2005 100.0000 -1, 100,000.000 -1,099 ,896. 72 1,099,896.72 0.00
08/ 17 /2005SEC ID: 8/17/2005 313589KN20CSF07511102: LIQUID OPER-8/17/2005 PIM CO
MT FEDERAL NATL MTG ASSN DISCOUNT BOND 8/ 18/2005 100.0000 -1, 100,000.000 -1,099 ,896. 72 1,099,896.72 0.00
MATURITYSEC ID: 8/18/2005 313589KP70CSF07511102: LIQUID OPER-8/18/2005 PIM CO
Workbencl1
·•Actual Settle Date 47
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/1/2005-8/31/2005
Tran
Trade Date
Settle Date
Reported Date Type Description
MT
MT
MT
MT
FEDERAL NATL MTG ASSN DISCOUNT MAT
08/19/2005SEC JD:
313589KQ50CSF07511102: LIQUID OPER-
PIMCO
FEDERAL NATL MTG ASSN DISCOUNT MAT
08/22/2005SEC ID:
313589KT90CSF07511102: LIQUID OPER-
PIMCO
FEDERAL NATL MTG ASSN DISCNTS MAT
08/23/2005SEC ID:
313589KU60CSF0751l102: LIQUID OPER-
PIMCO
8/19/2005
8/19/2005
8/19/2005
8/22/2005
8/22/2005
8/22/2005
8/23/2005
8/23/2005
8/23/2005
US TREASURY BILL 0.000% 08/04/2005 DD 8/4/2005
02/03/05SECID:912795VK40CSF07511102:8/4/2005
LIQUID OPER-PIMCO 8/4/2005
Local Price
Base Price
Base Ex Rate
100.0000
100.0000
100.0000
100.0000
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR:
TOTAL CASH & CASH EQUIVALENTS BASE:
FIXED INCOME SECURITIES
U.S. DOLLAR
MT BANK AMER NA TRANCHE #TR00255 VAR RT8/8/2005 100.0000
08/08/2005 DD 02/07 /05SEC ID: 8/8/2005 06050VLQ80CSF0751 l l 02: LIQUID OPER-8/8/2005 PIM CO
MT CITICORP 6.750% 08/15/2005SEC ID: 8/15/2005 100.0000
173034GH60CSF075 l l l 02: LIQUID OPER-8/15/2005 PIM CO 8/15/2005
* Actual Settle Date 48
Shares/Par
-1, 100,000.000
-1, 100,000.000
-l, 100,000.000
-2,000,000.000
-32 ,600,000.000
-32,600,000.000
-3,500,000.000
-50,000.000
Cost
Base
-1,099,896. 72
-1,099,691.08
-1,099,897.03
-1,982,359.44
-32,528,635.46
-32,528,635.46
-3,499,940.20
-50,115.00
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
1,099,896. 72
1,099,691.08
1,099,897.03
1,982,359.44
32,528,635.46
32,528,635.46
3,500,000.00
50,000.00
Net Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
o.oo
59.80
-115.00
Workbe11c11
i
'. OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/1/2005-8/31/2005
Tran
Type Description
Trade Date
Settle Date
Reported Date
MT FIRST UNION CORP 7.050% 08/01/2005 DD 8/1/2005
08/0l/95SECID:337358BBOOCSF07511102:8/l/2005
LIQUID OPER-PIMCO 8/ 1 /2005
Local Price
Base Price
Base Ex Rate
100.0000
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR:
TOTAL FIXED INCOME SECURITIES BASE:
TOTAL MATURITIES BASE:
INTEREST
CASH & CASH EQUIVALENTS
U.S. DOLLAR
IT
IT
IT
IT
FEDERAL HOME LN BK CONS DISC N MAT
08/01/2005SEC ID:
313385JW70CSF07511102: LIQUID OPER-
PIMCO
FEDERAL HOME LN BK CONS DISC N MAT
08/03/2005SEC ID:
313385JY30CSF07511102: LIQUID OPER-
PIMCO
FEDEARL HOME LN BK CONS DISC N MAT
08 I 04 I 2005SEC ID:
313385JZOOCSF07511102: LIQUID OPER-
PIMCO
8/1/2005
8/1/2005
8/1/2005
8/3/2005
8/3/2005
8/3/2005
8/4/2005
8/4/2005
8/4/2005
FEDERAL HOME LN BK CONS DISC MAT 8/ 5/2005
8/5/2005SECID:313385KA30CSF07511102:8/5/2005
LIQUID OPER-PIMCO 8/ 5/2005
·k Actual Settle Date 49
Shares/Par
-20,000.000
-3,570,000.000
-3,570,000.000
-36,170,000.000
1,900,000.000
1,900,000.000
2,600,000.000
2,300,000.000
Cost
Base
-20,028.60
-3,570,083.80
-3,570,083.80
-36,098,719.26
490.83
166.25
223.17
205.72
ReportID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
20,000.00
3,570,000.00
3,570,000.00
36,098,635.46
490.83
166.25
223.17
205.72
Net Gain/Loss
Base
-28.60
-83.80
-83.80
-83.80
0.00
0.00
0.00
0.00
Workbench
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ 1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FEDERAL HOME LN BK CONS DISC N MAT 8/8/2005 400,000.000 110.00 110.00 0.00
08/08/2005SEC ID: 8/8/2005 313385KD70CSF0751l102: LIQUID OPER-8/8/2005 PIM CO
IT FEDERAL HOME LN BK CONS DISC MAT 8/9/2005 700,000.000 65.72 65.72 0.00
08/09/2005SEC ID: 8/9/2005 313385KE50CSF0751l102: LIQUID OPER-8/9/2005 PIMCO
IT FEDERAL HOME LN BK CONS DISC N MAT 8/11/2005 800,000.000 73.33 73.33 0.00
08/ 11 /2005SEC ID: 8/11/2005 313385KGOOCSF0751l102: LIQUID OPER-8/11/2005 PIM CO
IT FEDERAL HOME LN MTG CORP DISC MAT 8/9/2005 1,300,000.000 9,819.34 9,819.34 0.00
08/09/2005SEC ID: 8/9/2005 313397KEOOCSF07511102: LIQUID OPER-8/9/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISC 8/1/2005 1,000,000.000 11,538.33 11,538.33 0.00
08/0I/2005SEC ID: 8/1/2005 313589JW40CSF07511102: LIQUID OPER-8/1/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/8/2005 1,200,000.000 9,861.67 9,861.67 0.00
08/08/2005SEC ID: 8/8/2005 313589KD40CSF07511102: LIQUID OPER-8/8/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/9/2005 1,300,000.000 122.06 122.06 0.00
08/09/2005SEC ID: 8/9/2005 313589KE20CSF07511102: LIQUID OPER-8/9/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/10/2005 3,600,000.000 19,566.56 19,566.56 0.00
08/ 10/2005SEC ID: 8/ 10/2005 313589KF90CSF07511102: LIQUID OPER-8/10/2005 PIM CO
Workbe11c11
* Actual Settle Date 50
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/11/2005 2,800,000.000 255.11 255.11 0.00
8/ l l/2005SEC ID: 8/11/2005 313589KG70CSF07511102: LIQUID OPER-8/11/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/12/2005 1, 100,000.000 100.22 100.22 0.00
08/ 12/2005SEC ID: 8/12/2005 313589KH50CSF07511102: LIQUID OPER-8/12/2005 PIMCO
IT FEDERAL NATL MTG ASSN DISC NTS MAT 8/15/2005 1I100,000.000 302.50 302.50 0.00
08/ 15/2005SEC ID: 8/15/2005 313589KL60CSF07511102: LIQUID OPER-8/15/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISC NT MAT 8/16/2005 l, 100,000.000 101.44 101.44 0.00
08/ 16/2005SEC ID: 8/16/2005 3 l 3589KM40CSF07511 l 02: LIQUID OPER-8/16/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISC NTS MAT 8/17/2005 1,100,000.000 103.28 103.28 0.00
08/ 17 /2005SEC ID: 8/17/2005 313589KN20CSF07511102: LIQUID OPER-8/17/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISCOUNTSEC 8/18/2005 1J100,000.000 103.28 103.28 0.00
ID: 313589KP70CSF07511102: LIQUID OPER-8/ 18/2005
PIM CO 8/ 18/2005
IT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/19/2005 l, 100,000.000 103.28 103.28 0.00
08 I 19 /2005SEC ID: 8/19/2005 313589KQSOCSF0751l102: LIQUID OPER-8/19/2005 PIM CO
IT FEDERAL NATL MTG ASSN DISCOUNT MAT 8/22/2005 1 ,100,000.000 308.92 308.92 0.00
08/22/2005SEC ID: 8/22/2005 313589KT90CSF07511102: LIQUID OPER-8/22/2005 PIM CO
Workbench
·k Actual Settle Date 51
! OCSD·CONSOLIDATED • OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/1/2005-8/31/2005
I
I ~~~ Description
Trade Date
Settle Date
Reported Date
IT
IT
IT
IT
IT
FEDERAL NATL MTG ASSN DISCNTS MAT
08/23/2005SEC ID:
313589KU60CSF07511102: LIQUID OPER-
PIMCO
8/23/2005
8/23/2005
8/23/2005
US TREASURY BILL 0.000% 08/04/2005 DD 8/4/2005
02/03/05SECID:912795VK40CSF07511102:8/4/2005
LIQUID OPER-PIMCO 8/4/2005
DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF07522202: LONG TERM
OPER-PIMCO
DREYFUS TREASURY CASH MGMTSEC ID:
9960852470CSF0751l102: LIQUID OPER-
PIMCO
BSDT-LATE MONEY DEPOSIT ACCTSEC ID:
9960870940CSF07522202: LONG TERM
OPER-PIMCO
8/3/2005
8/1/2005
8/3/2005
8/3/2005 *
8/3/2005
8/1/2005
8/3/2005
8/3/2005 *
8/1/2005
8/1/2005
8/1/2005
Local Price
Base Price
Base Ex Rate
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR:
TOTAL CASH & CASH EQUIVALENTS BASE:
FIXED INCOME SECURITIES
U.S. DOLLAR
IT AIG SUNAMERICA GLOBAL REGS 5.850%
08/01/2008 DD 08/08/0ISEC ID:
U00907 AAOOCSF07522202: LONG TERM
OPER-PIMCO
*Actual Settle Date
8/1/2005
8/1/2005
8/1/2005
52
Shares/Par
l, l 00,000.000
2,000,000.000
0.000
0.000
0.000
32,600,000.000
32,600,000.000
752,000.000
Cost
Base
102.97
17,640.56
4,027.14
1,348.79
1.32
76,741.79
76,741.79
21,996.00
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
102.97
17,640.56
4,027.14
1,348.79
1.32
76,741.79
76,741.79
21,996.00
Net Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
o.oo
o.oo
0.00
Workbench
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT BANK AMER NA TRANCHE #TR00255 VAR RT8/9/2005 3,500,000.000 27,931.94 27,931.94 0.00
08/08/2005 DD 02/07 /05SEC ID: 8/8/2005 06050VLQ80CSF07511102: LIQUID OPER-8/9/2005 PIM CO 8/9/2005 *
IT CIT GROUP INC MTN #SR00092 VAR RT 8/23/2005 3,300,000.000 28,905.94 28,905.94 0.00
05/23/2008 DD 05/25/05SEC ID: 8/23/2005 12560PDVOOCSF07522202: LONG TERM 8/23/2005 OPER-PIMCO
IT CITIGROUP INC GLOBAL SR NT VAR RT 8/2/2005 1,600,000.000 13,329.78 13,329.78 0.00
05/02/2008 DD 05/02/05SEC ID: 8/2/2005 172967CW90CSF07522202: LONG TERM 8/2/2005 OPER-PIMCO
IT CITICORP 6.750% 08/ 15/2005SEC ID: 8/15/2005 50,000.000 1,687.50 1,687.50 0.00
173034GH60CSF0751l102: LIQUID OPER-8/15/2005 PIM CO 8/15/2005
IT WMP/HUNTOON PAIGE #000-11150 7.500% 8/29/2005 884.330 5,813.96 5,813.96 0.00
12/01/2030 DD 10/21/99SEC ID: 8/1/2005 302998GE30CSF07522202: LONG TERM 8/29/2005 OPER-PIMCO 8/29/2005 *
IT FHLMC MULTICLASS MTG SER E3 A VAR RT 8/15/2005 15,347.750 2,442.84 2,442.84 0.00
08/ 15/2032 DD 12/01/97SEC ID: 7/1/2005 3133TCE950CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 *
IT FEDERAL HOME LN BKS CONS BD VAR RT 8/29/2005 2, 700,000.000 20,261.10 20,261.10 0.00
02/27 /2012 DD 02/27 /04SEC ID: 8/27/2005 3133X3SQ70CSF07522202: LONG TERM 8/29/2005 OPER-PIMCO 8/29/2005 *
IT FHLMC GROUP #78-6064 6.384% 8/15/2005 149.790 181.72 181.72 0.00
01/01/2028 DD 12/01/97SEC ID: 7/1/2005 31348SWZ30CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 *
Workbench
·k Actual Settle Date 53
Transaction Detail Report ID: EWBA09
i Reported by Transaction Category Base Currency: USD
i OCSD-CONSOLIDATED · OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
I Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0254510 5.000% 8/25/2005 11,981.310 2,406.08 2,406.08 0.00
11/01/2017 DD 10/01/02SEC ID: 8/1/2005 31371 KVB40CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #025463 l 5.000% 8/25/2005 2,553.050 514.34 514.34 0.00
02/01/2018 DD 01/01 /03SEC ID: 8/1/2005 31371KY470CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005;.
IT FNMA POOL #0254760 5.000% 8/25/2005 2,367.040 465.62 465.62 0.00
06/01/2018 DD 05/0l/03SEC ID: 8/1/2005 31371K5V90CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL ##0254866 5.000% 8/25/2005 841.100 211.96 211.96 0.00
09/01/2018 DD 08/01/03SEC ID: 8/1/2005 31371LCB30CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0254907 5.000% 8/25/2005 7,623.980 1,581.41 1,581.41 0.00
10/01/2018 DD 09/01/03SEC ID: 8/1/2005 31371LDLOOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0254953 5.000% 8/25/2005 5, 116.000 1,125.20 1,125.20 0.00
11/01/2018 DD 10/01/03SEC ID: 8/1/2005 31371LE210CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0254987 5.000% 8/25/2005 15,790.740 3,023.20 3,023.20 0.00
12/01/2018 DD 1 l/01/03SEC ID: 8/1/2005 31371LF460CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0323980 6.000% 8/25/2005 3,261.810 597.88 597.88 0.00
04/01/2014 DD 09/0l/99SEC ID: 8/1/2005 31374T2MOOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
Workbench
* Actual Settle Date 54
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/ 1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0357328 5.000% 8/25/2005 534.430 86.45 86.45 0.00
01/01/2018 DD Ol/Ol/03SEC ID: 8/1/2005 31376J4M80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0357430 5.000% 8/25/2005 17,007.000 4,584.35 4,584.35 0.00
09/01/2018 DD 09/01/03SEC ID: 8/1/2005 31376KA710CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0456482 6.000% 8/25/2005 376.200 175.08 175.08 0.00
02/01/2014 DD 02/01/99SEC ID: 8/1/2005 31381CCT20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0509649 6.000% 8/25/2005 811.140 469.55 469.55 0.00
09/01/2014 DD 09/01/99SEC ID: 8/1/2005 31383QEWOOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0535451 6.000% 8/25/2005 2,238.940 465.42 465.42 0.00
06/01/2015 DD 07 /01/00SEC ID: 8/1/2005 31384VZQ80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0555363 5.000% 8/25/2005 5,834.840 1,111.52 1,111.52 0.00
04/01/2018 DD 03/01/03SEC ID: 8/1/2005 31385W5Y10CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0555453 5.000% 8/25/2005 532.750 115.48 115.48 0.00
05/01/2018 DD 04/01/03SEC ID: 8/1/2005 31385XBW60CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0555545 5.000% 8/25/2005 4,338.540 925.84 925.84 0.00
06/01/2018 DD 05/0l/03SEC ID: 8/1/2005 31385XES20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
Workbench
* Actual Settle Date 55
Transaction Detail Report ID: EWBA09
I Reported by Transaction Category Base Currency: USD
I OCSD-CONSOLIDATED. OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0555621 5.000% 8/25/2005 12,741.020 3,170.33 3,170.33 0.00
07 /01/2018 DD 06/01/03SEC ID: 8/1/2005 31385XG680CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0681309 5.000% 8/25/2005 6,024.270 1,754.93 1,754.93 0.00
02/01/2018 DD 02/01/03SEC ID: 8/1/2005 31391 Y3S40CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0681334 5.000% 8/25/2005 634.510 210.20 210.20 0.00
02/01/2018 DD 01/01/03SEC ID: 8/1/2005 31391Y4T10CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0684798 5.500% 8/25/2005 3.780.480 1,424.90 1,424.90 0.00
03/01/2033 DD 03/0l/03SEC ID: 8/1/2005 31400DX31 OCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0684908 5.000% 8/25/2005 7,699.850 1,163.75 1,163.75 0.00
06/01/2018 DD 05/01/03SEC ID: 8/1/2005 31400D3R 1 OCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0685200 5.000% 8/25/2005 2,015.640 625.64 625.64 0.00
03/01/2018 DD 03/0l/03SEC ID: 8/1/2005 3 l 400EGH70CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0685665 5.000% 8/25/2005 380.940 104.82 104.82 0.00
02/01/2018 DD 02/01/03SEC ID: 8/1/2005 3 l 400EW220CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0686318 5.000% 8/25/2005 3,689.440 941.31 941.31 0.00
03/01/2018 DD 03/01/03SEC ID: 8/1/2005 3 l 400FPB70CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
Workbencl1
*Actual Settle Date 56
..
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ 1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0688739 5.000% 8/25/2005 1,174.770 368.59 368.59 0.00
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31400JEL90CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0689859 5.000% 8/25/2005 399.210 336.05 336.05 0.00
05/01/2018 DD 05/01/03SEC ID: 8/1/2005 31400KMG80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005,.
IT FNMA POOL #0693834 5.000% 8/25/2005 11,821.890 1,979.63 1,979.63 0.00
03/01/2018 DD 03/01/03SEC ID: 8/1/2005 31400PY740CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0695852 5.000% 8/25/2005 3,706.090 734.69 734.69 0.00
05/01/2018 DD 05/01/03SEC ID: 8/1/2005 3 l 400SBVOOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005,.
IT FNMA POOL #0695889 5.000% 8/25/2005 7,707.320 2,598.81 2,598.81 0.00
05/01/2018 DD 05/01/03SEC ID: 8/1/2005 31400SC230CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0697026 5.000% 8/25/2005 113.600 77.39 77.39 0.00
05/01/2018 DD 04/01/03SEC ID: 8/1/2005 31400TLF20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0702210 5.000% 8/25/2005 6,662.910 745.99 745.99 0.00
05/01/2018 DD 05/01/03SEC ID: 8/1/2005 31401ADP90CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0702328 5.000% 8/25/2005 1,517.010 434.13 434.13 0.00
05/01/2018 DD 04/01/03SEC ID: 8/1/2005 31401AHD20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
. ··------------
Workbench
• Actual Settle Date 57
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0709148 5.000'Yo 8/25/2005 6,630.190 970.30 970.30 0.00
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401 HZM70CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0709360 5.000<Yc, 8/25/2005 8,842.250 2,150.60 2, 150.60 0.00
07 /01/2018 DD 06/01/03SEC ID: 8/1/2005 31401JB560CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0709826 5.000% 8/25/2005 2,393.310 371.60 371.60 0.00
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401JSP40CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #070991 7 5.000% 8/25/2005 3,602.550 765.83 765.83 0.00
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401JVJ40CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0709963 5.000% 8/25/2005 80.330 72.58 72.58 0.00
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401JWYOOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005.
IT FNMA POOL #0710235 5.000% 8/25/2005 10,290.060 1,948.75 1,948.75 0.00
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401KBC80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0713344 5.000% 8/25/2005 60.770 51.50 51.50 0.00
06/01/2018 DD 06/0l/03SEC ID: 8/1/2005 31401NP520CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO
8/25/2005 *
IT FNMA POOL #0713365 5.000% 8/25/2005 4,763.210 791.54 791.54 0.00
07 /01/2018 DD 07 /Ol/03SEC ID: 8/1/2005 31401NQS10CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
-------·~-
Workbe11cl1
• Actual Settle Date 58 ..
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0720319 5.000% 8/25/2005 11,861.230 2,415.47 2,415.47 0.00
07/01/2018 DD 07/01/03SEC ID: 8/1/2005 31401WG450CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 ;.-
IT FNMA POOL #0720369 5.000°;'11 8/25/2005 10,761.880 7,807.66 7,807.66 0.00
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 31401WJNOOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0721629 5.000% 8/25/2005 4,833.890 1,037.28 1,037.28 0.00
07 /01/2018 DD 06/0l/03SEC ID: 8/1/2005 31401XVW40CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0723487 5.000% 8/25/2005 1,020.450 767.83 767.83 0.00
06/01/2018 DD 06/01/03SEC ID: 8/1/2005 3 l 402AXQ40CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0725530 5.000% 8/25/2005 51,999.180 11,883.91 11,883.91 0.00
06/01/2019 DD 05/0l/04SEC ID: 8/1/2005 31402DA750CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0729601 5.000% 8/25/2005 3,386.020 1,381.68 1,381.68 0.00
07/01/2018 DD 07/01/03SEC ID: 8/1/2005 31402HRW30CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0732873 5.000% 8/25/2005 130.310 123.31 123.31 0.00
11/01/2018 DD 10/01/03SEC ID: 8/1/2005 31402MFN50CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0735227 5.500% 8/25/2005 20,651.840 4,441.93 4,441.93 0.00
02/01/2035 DD 01 /0 l/05SEC ID: 8/1/2005 31402QYY 1 OCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
Workbench
·• Actual Settle Date 59
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLJDATED • OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0737130 5.000% 8/25/2005 39,032.280 2,218.93 2,218.93 0.00
10/01/2018 DD 10/0l/03SEC ID: 8/1/2005 31402S4P90CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0738211 5.000% 8/25/2005 3,331.270 1,808.06 1,808.06 0.00
10/01/2018 DD 10/0l/03SEC ID: 8/1/2005 31402UDQ20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0738487 5.000% 8/25/2005 2,217.250 658.55 658.55 0.00
10/01/2018 DD 10/01/03SEC ID: 8/1/2005 31402UNC20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0740457 5.000% 8/25/2005 28,585.580 7,708.04 7,708.04 0.00
10/01/2018 DD 10/01/03SEC ID: 8/1/2005 3 l 402WTN80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0740471 5.000% 8/25/2005 2,965.570 2,678.61 2,678.61 0.00
10/01/2018 DD 10/01/03SEC ID: 8/1/2005 31402WT400CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 ..
IT FNMA POOL #0740748 5.000% 8/25/2005 3,881.550 2,665.62 2,665.62 0.00
10/01/2018 DD 11/01/03SEC ID: 8/1/2005 31402WSH70CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0743868 5.000% 8/25/2005 602.440 128.57 128.57 0.00
11/01/2018 DD 10/0l/03SEC ID: 8/1/2005 31403BMR10CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #07 44008 5.000% 8/25/2005 4,302.670 3,612.88 3,612.88 0.00
07 /01/2018 DD 09/0l/03SEC ID: 8/1/2005 31403BR540CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
Workbench
* Actual Settle Date 60
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005-8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0744316 5.000'Yo 8/25/2005 1,500.630 560.56 560.56 0.00
09/01/2018 DD 09/01/03SEC ID: 8/1/2005 3140383Z40CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0747914 5.000%1 8/25/2005 9,653.520 1,074.40 1,074.40 0.00
11/01/2018 DD 11/01/03SEC ID: 8/1/2005 31403F3XOOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL ##0748400 5.000% 8/25/2005 7,010.600 664.36 664.36 0.00
08/01/2018 DD 09/0l/03SEC ID: 8/1/2005 31403GNR90CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0748899 5.000% 8/25/2005 10, 195.700 3,418.85 3,418.85 0.00
12/01/2018 DD 11/01/03SEC ID: 8/1/2005 31403G7LOOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005.
IT FNMA POOL #0750377 5.000% 8/25/2005 47,937.190 7,404.19 7,404.19 0.00
11/01/2018 DD 11/0l/03SEC ID: 8/1/2005 31403JUA20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0750380 5.000% 8/25/2005 44, 118.460 6,285.92 6,285.92 0.00
11/01/2018 DD l l/01/03SEC ID: 8/1/2005 31403JUD60CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005.
IT FNMA POOL #0750445 5.000% 8/25/2005 617.040 579.83 579.83 0.00
11/01/2018 DD 11/01/03SEC ID: 8/1/2005 31403JWE20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0751960 5.000% 8/25/2005 8,672.080 2,768.78 2,768.78 0.00
12/01/2018 DD 11/01/03SEC ID: 8/1/2005 31403LMH10CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
--------··--------·~--------~ -
Workbench
* Actual Settle Date 61
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0753425 5.000% 8/25/2005 23,888.750 2,956.31 2,956.31 0.00
11/01/2018 DD 11/0l/03SEC ID: 8/1/2005 31403NA230CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0755165 5.000% 8/25/2005 2,462.690 2,035.46 2,035.46 0.00
12/01/2018 DD l l/01/03SEC ID: 8/1/2005 31403Q6A30CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0756372 5.000% 8/25/2005 3,922.190 3,401.50 3,401.50 0.00
11/01/2018 DD l l/01/03SEC ID: 8/1/2005 31403SJR80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0784251 5.000% 8/25/2005 94,190.000 12,431.85 12,431.85 0.00
11/01/2019 DD ll/01/04SEC ID: 8/1/2005 3 l 405BH460CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0789670 5.000% 8/25/2005 4,594.290 3,456.14 3,456.14 0.00
12/01/2019 DD 12/01/04SEC ID: 8/1/2005 31405HJP40CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0792432 5.000% 8/25/2005 12,337.330 3,488.24 3,488.24 0.00
10/01/2019 DD 10/01/04SEC ID: 8/1/2005 31405LLM90CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0792437 5.000% 8/25/2005 122, 138.270 20,348.07 20,348.07 0.00
10/01/2019 DD 10/0l/04SEC ID: 8/1/2005 31405LLS60CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0794195 5.000% 8/25/2005 3,575.380 3,677.17 3,677.17 0.00
11/01/2019 DD l l/Ol/04SEC ID: 8/1/2005 31405NKG90CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO
8/25/2005 *
Workbench
·• Actual Settle Date 62
Transaction Detail Report ID: EWBA09
I OCSD-CONSOLIDATED -OCSGOOOlOOOO
Reported by Transaction Category Base Currency: USD
8/1/2005-8/31/2005 Status: FINAL I
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0797160 5.000% 8/25/2005 108,812.820 12,898.19 12,898.19 0.00
12/01/2019 DD 12/0l/04SEC ID: 8/1/2005 31405RTR70CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0797408 5.000% 8/25/2005 3,013.180 3,296.39 3,296.39 0.00
12/01/2019 DD 12/01/04SEC ID: 8/1/2005 31405R3R50CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0797414 5.000% 8/25/2005 3,821.620 3,254.26 3,254.26 0.00
12/01/2019 DD 12/0l/04SEC ID: 8/1/2005 31405R3X20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0800370 5.000% 8/25/2005 1,471.200 1,488.64 1,488.64 0.00
12/01/2019 DD 11/01/04SEC ID: 8/1/2005 31405VFK80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0800998 5.500% 8/25/2005 29,983.360 1,519.25 1,519.25 0.00
11/01/2034 DD 11/01/04SEC ID: 8/1/2005 31405V3F20CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0803923 5.000% 8/25/2005 12,179.770 12, 133.81 12,133.81 0.00
12/01/2019 DD 12/01/04SEC ID: 8/1/2005 31406AD410CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0807711 5.000% 8/25/2005 12,760.220 12, 186.12 12,186.12 0.00
01/01/2020 DD 01/01/05SEC ID: 8/1/2005 31406EKY90CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0808933 5.500% 8/25/2005 329.460 1,521.56 1,521.56 0.00
01/01/2035 DD 01/0l/05SEC ID: 8/1/2005 31406FV240CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
Workbench
k Actual Settle Date 63
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FNMA POOL #0809350 5.500% 8/25/2005 7,083.100 1,484.38 1,484.38 0.00
12/01/2034 DD Ol/Ol/05SEC ID: 8/1/2005 31406GEX30CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0814930 5.500% 8/25/2005 4,027.580 1,505.85 1,505.85 0.00
04/01/2035 DD 04/01/05SEC ID: 8/1/2005 3 l 406NLK80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005.
IT FNMA POOL #0815923 5.500% 8/25/2005 10,445.790 1,530.58 1,530.58 0.00
03/01/2035 DD 03/01/05SEC ID: 8/1/2005 31406PPG80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005.
IT FNMA POOL #0816246 5.000% 8/25/2005 2,663.880 2,594.25 2,594.25 0.00
03/01/2020 DD 03/01/05SEC ID: 8/1/2005 31406PZK80CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005.
IT FNMA POOL #0819566 5.500% 8/25/2005 3,947.420 1,504.36 1,504.36 0.00
04/01/2035 DD 04/0l/05SEC ID: 8/1/2005 31406TQT10CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0822731 5.500% 8/25/2005 353.190 1,512.27 1,512.27 0.00
05/01/2035 DD 05/01/05SEC ID: 8/1/2005 31406XA850CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0823232 5.500% 8/25/2005 372.730 1,520.58 1,520.58 0.00
06/01/2035 DD 05/0l/05SEC ID: 8/1/2005 31406XSVSOCSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
IT FNMA POOL #0823787 5.000% 8/25/2005 7,622.220 8,108.48 8,108.48 0.00
05/01/2020 DD 05/01/05SEC ID: 8/1/2005 31406YF470CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO 8/25/2005 *
Workbench
.,. Actual Settle Date 64
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED • OCSGOOOlOOOO 8/1/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT FIRST UNION CORP 7.050% 08/01/2005 DD 8/1/2005 20,000.000 705.00 705.00 0.00
08/01/95SEC ID: 337358BBOOCSF0751II02:8/ 1/2005
LIQUID OPER-PIMCO 8/ 1/2005
IT GNMA POOL #0421389 6.500% 8/15/2005 19.040 42.97 42.97 0.00
04/15/2026 DD 04/01/96SEC ID: 8/1/2005 36206UC230CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 *
IT GNMA POOL #0449851 6. 500% 8/15/2005 19.930 64.82 64.82 0.00
01/15/2028 DD 01/01/98SEC ID: 8/1/2005 36208FWLOOCSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 *
IT GNMA POOL #0466845 6.500% 8/15/2005 48.680 175.39 175.39 0.00
06/15/2028 DD 06/01/98SEC ID: 8/1/2005 36209BTA60CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005.
IT GNMA POOL #0468052 6.500% 8/15/2005 69,386.460 592.28 592.28 0.00
07I15/2028 DD 07 /01/98SEC ID: 8/1/2005 36209C5M40CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 '*
IT GNMA POOL #04 76041 6.500% 8/15/2005 215.020 628.57 628.57 0.00
06/15/2028 DD 06/01/98SEC ID: 8/1/2005 36209MZE70CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 '*
IT GNMA POOL #04 78626 6.500% 8/15/2005 190.930 646.30 646.30 0.00
01/15/2029 DD 01/01/99SEC ID: 8/1/2005 36209QVT90CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 '*
IT GNMA POOL #0480598 6.500% 8/15/2005 40.870 154.35 154.35 0.00
10/ 15/2028 DD 10/01/98SEC ID: 8/1/2005 36209S3F60CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 *
Workbenc11
·• Actual Settle Date 65
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED-OCSGOOOlOOOO 8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT GNMA POOL #0512235 6.500% 8/15/2005 8.270 31.52 31.52 0.00
11/15/2029 DD l l/Ol/99SEC ID: 8/1/2005 36211GBC60CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/] 5/2005 *
IT GNMA POOL #0514326 6.500% 8/15/2005 284.680 418.28 418.28 0.00
07/15/2029 DD 07/0l/99SEC ID: 8/1/2005 362l1JLF20CSF07522202: LONG TERM 8/15/2005 OPER-PIMCO 8/ 15/2005 *
IT GNMA II POOL #0080023 VAR RT 12/20/20268/22/2005 2,804.070 461.01 461.01 0.00
DD 12/0l/96SEC ID: 8/1/2005 36225CAZ90CSF07522202: LONG TERM 8/22/2005 OPER-PIMCO 8/22/2005 *
IT GNMA II POOL #080088M 7.375% 8/22/2005 8,159.440 611.17 611.17 0.00
06/20/2027 DD 06/0l/97SEC ID: 8/1/2005 36225CC200CSF07522202: LONG TERM 8/22/2005 OPER-PIMCO 8/22/2005 *
IT GNMA II POOL #0080395 VAR RT 8/22/2005 6,004.640 523.23 523.23 0.00
04/20/2030 DD 04/01/00SEC ID: 8/1/2005 36225CNM40CSF07522202: LONG TERM 8/22/2005 OPER-PIMCO 8/22/2005 *
IT GNMA II POOL #080408X VAR RT 8/22/2005 52,854.490 4,647.03 4,647.03 0.00
05/20/2030 DD 05/01/00SEC ID: 8/1/2005 36225CN280CSF07522202: LONG TERM 8/22/2005 OPER-PIMCO 8/22/2005 *
IT GNMA II POOL #0080965 VAR RT 8/22/2005 37,532.440 3,463.31 3,463.31 0.00
07 /20/2034 DD 07/01 /04SEC ID: 8/1/2005 36225DC880CSF07522202: LONG TERM 8/22/2005 OPER-PIMCO
8/22/2005 *
IT GNMA GTD REMIC TR 2000-9 FH VAR RT 8/16/2005 10,119.210 1,375.38 1,375.38 0.00
02/ 16/2030SEC ID: 8/16/2005 3837H4NX90CSF07522202: LONG TERM 8/16/2005 OPER-PIMCO
Workbencll
* Actual Settle Date 66
Transaction Detail Report ID: EWBA09
Reported by Transaction Category Base Currency: USD
I OCSD-CONSOLIDATED. OCSGOOOlOOOO
1
8/ l/2005 -8/31/2005 Status: FINAL
Trade Date Local Price
Tran Settle Date Base Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Ex Rate Shares/Par Base Base Base
IT HSBC FIN CORP MTN # TR 00002 VAR RT 8/31/2005 3,000,000.000 25,760.00 25,760.00 0.00
02/28/2007 DD 03/29/05SEC ID: 8/31/2005 40429JAB30CSF07522202: LONG TERM 8/31/2005 OPER-PIMCO
IT HSBC FIN CORP MTN# TR 00007 VAR RT 8/ 10/2005 3,000,000.000 26,680.00 26,680.00 0.00
05/10/2010 DD 05/10/05SEC ID: 8/10/2005 40429JAG20CSF07522202: LONG TERM 8/ 10/2005 OPER-PIMCO
IT MORGAN STANLEY NT VAR RT 11/09/2006 8/9/2005 650,000.000 5,462.56 5,462.56 0.00
DD 11/12/04SEC ID: 8/9/2005 61746SAZ20CSF07522202: LONG TERM 8/9/2005 OPER-PIMCO
IT RESIDENTIAL ASSET 03-RS 11 AIIB VAR RT 8/25/2005 37,501.300 1,341.34 1,341.34 0.00
12/25/2033 DD 12/30/03SEC ID: 8/25/2005 760985K830CSF07522202: LONG TERM 8/25/2005 OPER-PIMCO
IT SBA GTD PARTN CTFS SBIC-PS 01 6.640% 8/10/2005 479,454.480 27,211.07 27,211.07 0.00
02/10/2011 DD 02/21/0lSEC ID: 8/1/2005 831641DD40CSF07522202: LONG TERM 8/10/2005 OPER-PIMCO 8/ 10/2005"
IT TOYOTA MTR CR MTN #TR00413 VAR RT 8/18/2005 2,000,000.000 5,767.29 5,767.29 0.00
09/ 18/2006 DD 03/ 16/05SEC ID: 8/18/2005 89233PTE60CSF07522202: LONG TERM 8/18/2005 OPER-PIMCO
CD US TREASURY INFLATION INDEX NT 3.625% 8/31/2005 0.000 1,176.00 1,176.00 0.00
01/ 15/2008 DD 01/ 15/98SEC ID:
9128273T70CSF07522202: LONG TERM 8/31/2005 OPER-PIMCO
CD US TREASURY INFLATION INDEX NT 3.875% 8/31/2005 0.000 5,225.00 5,225.00 0.00
01/ 15/2009 DD 01/ 15/99SEC ID:
9128274Y50CSF07522202: LONG TERM 8/31/2005 OPER-PIMCO
------
Workbench
·k Actual Settle Date 67
OCSD-CONSOLIDATED -OCSGOOOlOOOO
Transaction Detail
Reported by Transaction Category
8/ l/2005 -8/31/2005
Tran
Trade Date
Settle Date
Reported Date
Local Price
Base Price
Base Ex Rate Type Description
CD
CD
IT
IT
US TREASURY INFLATION INDEXED 2.000% 8/31/2005
01/15/2014 DD Ol/15/04SEC ID:
912828BW90CSF07522202: LONG TERM
OPER-PIMCO 8/31/2005
US TREASURY INFLATION INDEX NT 2.000% 8/31/2005
07I15/2014 DD 07I15/04SEC ID:
912828CP30CSF07522202: LONG TERM
OPER-PIMCO 8/31/2005
US TREASURY NOTES 2.750% 07 /31/2006 8/ 1/2005
DD 07 /31/04SEC ID: 7 /31/2005
912828CQ10CSF07522202: LONG TERM 8/1/2005
OPER-PIMCO 8/ 1/2005"
US TREASURY NOTES 2.375% 08/31/2006 8/31/2005
DD 08/31/04SEC ID: 8/28/2005
912828CU20CSF07522202: LONG TERM 8/3 !/2005
OPER-PIMCO 8/31/2005 *
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR:
TOTAL FIXED INCOME SECURITIES BASE:
TOTAL INTEREST BASE:
Shares/Par
0.000
0.000
14,000,000.000
55,300,000.000
91,576,231.380
91,576,231.380
124,176,231.380
Cost
Base
49.00
1,488.00
192,500.00
656,687.50
1,322,041.32
1,322,041.32
1,398, 783.11
Report ID: EWBA09
Base Currency: USD
Status: FINAL
Amount
Base
Net Gain/Loss
Base
49.00 0.00
1,488.00 0.00
192,500.00 0.00
656,687.50 0.00
1,322,041.32 0.00
1,322,041.32 o.oo
1,398, 783.11 0.00
TOTAL TRANSACTIONS: 108,6s2,180.1so ___ -4_7_,_19_9_,_9_9_4_.8_s _____ ._1_1_, 7_3_0_,_14_0_._1a ____ -2_,_4_89_,_9_2_1._6_0
Workbenc11
·• Actual Settle Date 68
FAHR COMMITTEE Meeting Date To Bel. of Dir.
9/14/05 9/28/05
AGENDA REPORT Item Number Item Number
FAHR05-72 14(c)
Orange County Sanitation District
FROM: Marc Dubois, Contracts I Purchasing Manager
SUBJECT: GENERAL MANAGER APPROVED PURCHASES
GENERAL MANAGER'S RECOMMENDATION
Receive and file report of General Manager approved purchases in amounts exceeding
$50,000 in accordance with Resolution No. OCSD04-08.
SUMMARY
In May 1998, the FAHR Committee and the Board approved changes to the staff
purchasing authority. One of the changes was to increase the dollar threshold before
Board authority was required for purchases of goods or services, excluding public works
purchases, to $100,000.
When approving this change, the Committee asked for periodic reports showing
purchases approved by the General Manager for amounts between $50,000 and
$100,000. Subsequent to receiving the initial report, the Committee requested that
future reports be placed on the Consent Calendar.
Vendor Name Amount Description/Discussion
Oracle Corporation $73,356 Support for Enterprise One materials.
TMV Systems Engineering, Inc. $75,000 Software services.
American Airlines $99,999 Blanket order for Air travel card.
Undersea Graphics $95,000 Underwater inspection services and studies.
DGA Consultants $70,000 CCTV data evaluation support.
United Pumping Service $60,000 Vacuum services for Plants 1 & 2.
DKG Construction $85,000 Seismic retrofit Building H -Plant 1 .
Graybar Electric Company $50,740 Modicon Quantum PLC Controller upgrade.
Black & Veatch Corporation $55,750 Evaluate staff exposure to arc flash energy.
Section 4.03.B of Resolution 04-08, the District's Delegation of Authority Resolution,
authorizes the Contracts I Purchasing Manager to purchase items that have been
previously authorized by the Board as identified in the annual District budget. During
the budget adoption process, the lists of these items were highlighted for the Directors.
For these reasons, purchases that fell into these categories are not included in this
report.
H:ldeptlagenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 14(c).GM Purchases.doc
Revised: ()6.104/03 Page 1
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
D This item has been budgeted. (Line item: ) D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
~ Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
None
H:\dept\agenda\Board Agenda Repons\2005 Board Agenda & Agenda Repons\0905\ltem 14(c).GM Purchases.doc
Revrsed: 06!'04/03 Page 2
1 FAHR COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: Lisa Tomko, Director of Human Resources
Originator: Jeff Reed, Human Resources Manager
Meeting Date To Bel. of Dir.
09/14/05 9/28/05
Item Number Item Number
FAHR05-73 14(d)
SUBJECT: CHANGES AND ADDITIONS TO HUMAN RESOURCES POLICIES AND
PROCEDURES AS AUTHORIZED BY RESOLUTION 98-33.
GENERAL MANAGER'S RECOMMENDATION
Adopt Resolution No. OCSD 05-23, amending Resolution No. OCSD 98-33, amending
Human Resources Policies and Procedures Manual.
SUMMARY
The attached policy revisions are forwarded for approval to maintain consistent
language with the Memorandums of Understanding (MOU), address new legislation, or
to clarify procedures.
Changes and additions to the Human Resources Policies and Procedures Manual will
be done on a quarterly basis. The next quarterly update is scheduled for December
2005.
PRIOR COMMITTEE/BOARD ACTIONS
• Human Resources Policies and Procedures Manual revisions were presented at the
March 2005 FAHR Committee and Board of Directors meetings.
PROJECVCONTRACTCOSTSUMMARY
NIA
BUDGET IMPACT
D This item has been budgeted. (Line item: )
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
IZI Not applicable (information item)
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 14(d).HR Policy Procedure Update.doc
Page 1
f
ADDITIONAL INFORMATION
Policy Number and Subject From To Reason for Change
E30.00, Human Resources Records N/A N/A Delete policy. Information incorporated into
policy E31 .00, as noted below.
New policy. Establish policy, procedures,
E31 .00, Privacy Information and N/A N/A and guidelines for handling and maintaining
Human Resources Records privacy information, personnel files, and any
system of records.
F20.10, Hours of Work -Exempt Current Language Revised Language Revise memo time language to reflect
Employees management recommendations.
Revise policy to include OMV Employer Pull-
F41.00, Vehicle Usage Current Language Revised Language Notice and DOT testing information, private
use, cell phone use, and employee
responsibilities for failinq to comply with law.
F90.00, Substance Abuse Current Language Revised Language Revise policy to reflect Drug Free Workplace
Act compliance and grant requirements.
Revise policy to clarify where smoking is and
F100.00, Smoking Current Language Revised Language is not permitted in order to make the policy
more effective in accordance with Federal
and State requlations.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. E30.00 Human Resources Records
2. E31.00 Privacy Info rmation & Human Resources Records
3. F20.1 O Hours of Work -Exempt Employees
4. F41 .00 Vehicle Usage
5. F90.00 Substance Abuse
6. F1 00.00 Smoking
7. Resolution No. OCSD 05-23
H:ldeptlagenda\Board Agenda Repons\2005 Board Agenda & Agenda Repons\0905\ltem 14(d).HR Policy Procedure Update.doc
Page 2
-Policy being Deleted -
Orange County
Sanitation District
Policy Number: E30.00
Effective Date: se'-tember'.~28 ···~2o«>·s ... P .... ,..,,_, ....................... , ... ,,..,, ..... .
Oetober 22, 1997
Subject: HUMAN RESOURCES RECORDS Supersedes: Octciber ·22, • .1997
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for
accessing Human Resources records.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all employees regardless of their organizational unit.
3.0 DEFINITIONS
4.0 POLICY
4.1 An employee's Human Resources File (Personnel File) is the District's permanent
record of that individual's personal data and employment history, and as such is to be
accurately maintained and treated confidentially, to the extent allowable by law.
5.0 PROCEDURE
5.1 Employees are responsible for immediately notifying the Human Resources
Department of any changes in their personal status, including any change of address
or person to contact in the event of an emergency. Maintenance of an employee's
payroll status, insurance coverage and other benefit entitlements is dependent upon
the existence of accurate information in the file.
5.2 Employees may inspect their Personnel File in the Human Resources Department
office and obtain copies of items contained in the file at any time the Human
Resources Department is open. Employees who wish to correct any erroneous or
alleged erroneous information in their file should submit such a request in writing to
the Human Resources Director, who will judge the merits of the request and respond
to the employee.
5.3 Personal data contained in the Personnel File is only accessible to the employee's
direct supervisor, or a supervisor within the department, for purposes involving
transfers or promotions. Supervisors and managers will be provided access to
personnel records of employees in other organizational units with the prior approval of
the affected employee's direct supervisor or the Human Resources Department on a
need-to-know basis.
6.0 EXCEPTIONS
7.0 PROVISIONS AND CONDITIONS
8.0 RELATED DOCUMENTS
Page I of 1
-New Policy -
~ Orange County Policy Number: E31.00
Sanitation District ""' Effective Date: September 28, 2005
Subject: PRIVACY INFORMATION & Supersedes: Policy E30.00
1.0
HUMAN RESOURCES RECORDS
Approved by: Lisa L. Tomko
PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for receiving
and retaining employee information so that the Orange County Sanitation District (OCSD)
can make appropriate management decisions, administer programs, and satisfy
compliance requirements.
1.2 Establish rules of conduct for any person involved in the design, development, operation,
or maintenance of any system of records.
1.3 Establish uniform guidelines and procedures for accessing Human Resources records.
1.4 Establish uniform guidelines and procedures for maintaining the privacy of personal
information within established regulations.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all current Orange County Sanitation District (OCSD) employees
regardless of the organizational unit.
3.0 DEFINITIONS
3.1 Record -Recorded information, regardless of format.
3.2 Confidential Information -Information that requires a business "need-to-know", restricted
use, or is sensitive in nature is considered confidential information. Generally, OCSD
technical data, proprietary, customer, and personnel related information is confidential.
Personnel related information includes, but is not limited to, medical, recruitment,
disciplinary, and performance related information. Once information becomes generally
available to the public, it is no longer considered confidential. Contact the Human
Resources Department if there are questions.
3.3 Human Resources Records (Personnel. Medical and Similar Files) -OCSD's permanent
record of employee personal data and employment history.
4.0 POLICY
4.1 An employee's personnel, medical, or similar file is OCSD's permanent record of that
individual's personal data and employment history, and as such is to be accurately
maintained and treated confidentially, to the extent allowable by law.
4.2 OCSD treats personal information about employees as confidential and respects the
need for protecting each employee's privacy by enforcing secure information handling
Page 1of5
-New Policy -
procedures on the part of all personnel whose job duties involve gathering, retaining,
using, or releasing personal information about OCSD employees.
4.3 OCSD collects and retains only such personal information as it needs to make
appropriate management decisions, administer programs, and satisfy compliance
requirements. OCSD takes all possible steps to make sure that all personal and job-
related information about employees is accurate, complete, and relevant for the intended
purpose.
4.4 Employee information is considered confidential and will not be disclosed to internal or
external parties without a business need-to-know. Internal use shall be limited to those
officers and employees of the organization that maintain confidential records or who have
a need for the information in the performance of their duties. If there is a question of
whether certain information is considered confidential, the employee should first check
with the Human Resources Department.
4.5 Employees have the right to informational privacy and the guarantee of certain privacy
rights, such as the right to be free from defamatory statements. OCSD prohibits the
unauthorized gathering, dissemination, or misuse of sensitive and confidential
information. This provision includes the unwarranted disclosure of the individual's private
life outside the realm of legitimate business or public interest, which would be construed
as offensive and objectionable to a reasonable person of ordinary sensibilities.
4.6 Employees have a personal responsibility to limit the disclosure of their own sensitive and
confidential information outside the context of "business necessity," such as non-job
related medical information. If there is a question of whether certain information is
considered to be of a business necessity, the employee should contact the Human
Resources Department.
4.7 Pursuant to the Confidentiality of Medical Information Act (CMIA) and the Health
Insurance Portability and Accountability Act (HIPAA), OCSD will adhere to strict
confidentiality requirements in accordance with OCSD's HIPAA procedures manual with
respect to any medical information that has been obtained about an employee. Medical
information is any individually identifiable health information that is transmitted or
maintained in any form or medium, including electronically, on paper, or orally.
5.0 PROCEDURE
5.1 Security and Storage of Records
5.1.1 Employees who are required to gather, retain, use, or release personal record
information about other employees shall treat that information as confidential.
Secure handling procedures shall be used with personal employee information at
all times to ensure the highest integrity of such information.
5.1.2 All paper based documents relating to OCSD's personnel record system are kept
in secure, locked files in the Human Resources Department. These files are
accessible only to authorized Human Resources Department staff and
executives, managers and supervisors who have a valid, demonstrable need to
obtain specific information from an employee's personnel record. Employees are
also granted access to their personnel files and records in accordance with
access procedures outlined Memorandums of Understanding (MOUs) and
section 5.3 of this policy. All personnel files must remain in the Human
Resources Department at all times.
Page 2 of 5
'
-New Policy -
5.1.3 All employee medical information is kept separately from personnel files in
secure, locked medical record files in the Safety and Health Division. All
managers and supervisors are required to forward original medical
documentation pertinent to an OCSD employee, to the Safety and Health
Division. Access to Medical Records is tightly controlled. Unless there is a
business necessity, medical information about an employee is supplied only to
the employee's designated physician in accordance with the employee's specific
written request.
5.2 Accuracy of Basic Employee Information
5.2.1 Maintenance of an employee's payroll status, insurance coverage, and other
benefit entitlements is dependent upon accurate information.
5.2.2 Employees are responsible for immediately notifying the Human Resources
Department of any changes in their personal status, including, but not limited to
the following categories:
• Name
• Telephone Number
• Home Address
• Emergency Contact Information
5.3 Access to Personnel Records
5.3.1 Internal Disclosures and Uses of Personnel File Information
5.3.1.1
5.3.1.2
5.3.1.3
Managers/Suoervisors: Managers and supervisors may only have
access to personal employee information and personnel files on a
business need-to-know basis. A manager or supervisor considering
the hire of a former employee or transfer/promotion of a current
employee may be granted access to the appropriate personnel file.
Current and Former Employees: Employees can review and obtain
copies of the information contained in their own personnel file.
OCSD reserves the right to remove certain sensitive documents,
including pre-employment background reports; letters of reference;
and management planning documents such as succession or
promotion plans. Current and former employees interested in
reviewing and/or obtaining copies of items contained in their
personnel file should contact the Human Resources Department and
provide at least a three-day notice requesting to schedule a mutually
convenient time for an appointment. Personnel files may not be
taken outside of the Human Resources Department. A Human
Resources Department representative shall always be present while
an employee is examining his/her personnel file.
Accuracy of Information: If an employee has concerns about the
accuracy, completeness or fairness of materials contained in
personnel files, the employee may submit a written request to the
Director of Human Resources for review of the information in
question. The Director of Human Resources will judge the merits of
the request and will respond to the employee.
Page 3 of 5
-New Policy -
5.3.2 External Disclosures and Uses of Personnel File Information
5.3.2.1
5.3.2.2
5.3.2.3
5.3.2.4
6.0 EXCEPTIONS
Employment Verifications: OCSD will verify, to non-governmental
agencies, the employment status (e.g. dates of employment and
positions held) of former or current employees. No other information
will be provided unless OCSD has received a written request to do
so from the employee involved.
Pre-employment Verifications: OCSD will ensure that all inquires
into an applicant's privacy are narrowly tailored to ascertain the
applicant's ability to perform the essential duties of the position and
intrude as minimally as possible into their private affairs. In no
situation will an applicant be disqualified from entering or pursuing a
profession, vocation, or employment because of sex, sexual
orientation, race, creed, color, national origin, or any other legally
protected classification. Hiring decisions are made on a case-by-
case basis, which include the totality of an applicant's background
within the guidelines of the law. All information received will follow
the guidelines set forth in Security and Storage of Records section.
Bargaining Units: OCSD will provide to the union representing an
employee information related to the employee's seniority date, job
classification, wage rate, hours of employment, benefit information
and such other data as OCSD deems necessary and appropriate in
support of the collective bargaining process. OCSD will also provide
such other personal and confidential information as the employee
shall direct OCSD to disclose.
Governmental Agencies: On occasion, OCSD must provide
information and data from its personnel records and files to federal,
state and local government agencies in accordance with
recordkeeping and reporting requirements imposed by such
agencies. In instances where representatives of government or law
enforcement agencies request information beyond that which is
normally required, the decision to provide the information will be
made at the discretion of the Human Resources Department.
7.0 PROVISIONS AND CONDITIONS
7 .1 E-mail, Internet and other records maintained on OCSD computers are not generally
considered confidential employee records.
8.0 RELATED DOCUMENTS
8.1 California Constitution
8.2 California Public Records Act, Government Code Section 6250-6270
8.3 Confidentiality of Medical Information Act, Civil Code 56
8.4 Health Insurance Portability and Accountability Act 42 U.S.C 1301
8.5 Policy E90.00 Series, Information Systems Management
8.6 Policy F90.00, Substance Abuse
Page 4 of 5
-New Policy -
8.7 Safety-POL-403: Access to Employee Medical Records
8.8 Local 501, Operations and Maintenance Unit MOU
8.9 Administrative and Clerical Unit MOU
8.1 o Engineering Unit MOU
8.11 Technical Services Unit MOU
8.12 Professional Group MOU
8.13 Supervisor Group MOU
Page 5 of 5
Orange County
Sanitation District
Subject: HOURS OF WORK -EXEMPT
EMPLOYEES
1.0 PURPOSE
Policy Number: F20.10
Effective Date: ~~@pi~lti~@f;;~~;, 2($<)§
DeGember 15, 2004
Supersedes: b~~~mb~ft1:§~·:;2oo4
April 26, 2000
Approved by: Lisa L. Tomko
1.1 The purpose of this policy is to establish uniform guidelines and procedures for use in the
administration of Orange County Sanitation District's {OCSD's) working hours.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all OCSD exempt employees in all organizational units and departments
unless otherwise specified.
3.0 DEFINITIONS
3.1 Exempt Employees are employees who are not covered by the minimum wage and overtime
provisions of the Fair Labor Standards Act {FLSA), as amended. Such employees are
considered exempt by virtue of their duties in conformance with FLSA's definition of
Executive, Administrative and Professional employees.
3.2 Flextime is the option of employees to choose the starting and finishing times of their shift with
supervisory pre-approval.
3.3 Overtime is the number of hours, which are counted as time worked, in excess of 40 hours
during a workweek. For the purposes of overtime, all time charged to unscheduled leave will
not be counted as time worked. Overtime only applies to non-exempt employees.
3.4 Memo time is the number of hours in excess or short of the normal working hours for an
employee in a single workday. The normal working hours could be 8, 9, 10 or 12 depending
on the employee's assigned schedule.
3.5 Core Hours are the hours between 8:00 a.m. and 4:00 p.m. on any given day.
3.6 Payday is the Wednesday before the end of the subsequent pay period.
3.7 Pay Periods occur bi-weekly and are calculated on the basis of 80-hours worked for full-time
employees.
3.8 Workweek means 40-hours of work per 168-hour period. The workweek is a fixed and
recurring period of 168-hours, or seven consecutive 24-hour periods. OCSD employee
workweeks are structured on an individual and/or group basis so that 40-hours of work
regularly occurs during the fixed and regularly recurring period of 168-hours. The specific
workweek for each employee is fixed by the General Manager, or his designee, and is
maintained by the accounting payroll office.
3.9 Leave time is any authorized leave-of-absence with pay outlined in OCSD's policies and
procedures, such as vacation leave, sick leave, personal leave, etc.
Page I of 4
4.0 POLICY
4.1 It is the policy of OCSD to establish the time and duration of working hours as required by
work load, operations flow, customer service needs, the efficient management of human
resources, and any applicable law.
4.2 It is the policy of OCSD to require exempt employees to complete weekly timesheets. Exempt
employees must use approved leave time for any partial-day absences unless memo time is
authorized.
4.3 In certain situations employees may not be required to use leave time for partial-day absences
and may be eligible to use memo time. This situation may occur if the employee received
advance approval from his/her supervisor and if the employee makes up the scheduled time
off in the same pay period.
4.4 On occasion, employees may request or be asked to transition from part-time to full-time
status or vice-versa. It is the right of OCSD, at its sole discretion, to schedule working hours
and assign work that may be necessary to operate OCSD in the most efficient and
economical manner and in the best interest of the public it serves. Due consideration will be
given to an employee's input and concerns prior to implementation of a schedule change.
Multiple transitions to full-time or part-time, requested by the affected employee, shall be
deemed as an abuse of this privilege and factored into future considerations for approval. A
thirty (30) day written notice for work schedule changes must be given to an affected
employee prior to the change.
5.0 PROCEDURE
5.1 Normal Business Hours. Administrative and business functions are normally performed
between the hours of 7:30 a.m. and 5:30 p.m., Monday through Thursday, and between the
hours of 7:30 a.m. and 4:30 p.m. on Friday. However, OCSD allows flextime for employees to
choose their starting and finishing times as long as employees whose jobs involve contact
with the public or outside organizations are present between the core hours of 8:00 a.m. and
4:00 p.m. In addition, department heads, or designee, may deny flextime to certain
employees for reasons of business necessity, workflow, or customer service needs.
5.2 Core Hours. Individual divisions may schedule work beyond the core hours of 8:00 a.m. and
4:00 p.m., subject to approval by the department head, or designee, to meet specific
operating or service requirements in the most cost-effective and efficient manner. Actual
starting and ending times of an employee's shift may vary depending on the operational
requirements of each department.
5.3 Shift Schedules. For time record keeping and accounting purposes, the "workweek" for full-
time employees is 40 hours per 168-hour period, to be paid on a biweekly payroll basis of 80
hours worked. The actual work periods may be scheduled in shifts of four 9-hour days and
one 4-hour day each workweek (9/80 schedule), five 8-hour days each workweek (10/80), four
10-hour days each workweek (8/80), or three 12-hour days and one 4-hour day each
workweek (7/80) at the discretion of the supervisor. The starting and ending times of
individual employee workweeks may vary.
5.4 Meeting Attendance. Employee attendance at lectures, meetings, and training programs will
be considered as part of an employee's work hours if attendance is requested by
management.
5.5 Timesheets -Exempt Employees. Exempt employees are not eligible to receive overtime
pay; however, exempt employees must account for daily attendance. The following points
shall be considered when filling out time sheets:
Page 2of4
-'
5.5.1 Timesheets for exempt employees shall indicate the days worked during the pay
period and include all time taken as paid or unpaid leave. Timesheets should report a
total of eighty (80) hours per pay period plus any applicable memo time.
5.5.2 Hours in excess or short of the daily total should be accounted for in the work
description line titled Memo Time. (Please refer to the sample timesheet). The
appropriate subledger number should be entered, and the timesheet signed by the
appropriate management level;~C>I" designee. When using subledger numbers, time
should be recorded in blocks of half hour increments or more.
5.5.3 Employees may be able to draw hours from their memo time in certain situations;
however, memo time is NOT compensatory time and will NOT be granted on an hour
for hour basis. It is to be used on an exception basis and must be approved in
advance by the supervisor. For example, if an employee schedules 2.5 hours off
and makes up that time during that pay period, memo time may be used. (Please
refer to the attached sample timesheets). Memo time, in some occurrences, may be
allowed for an entire day, but may not replace the use of leave time, such as vacation
time, when practical. F'.or example, memo time may Rot l:>e used iR soRjuRstioR with
vasatioR, sisk or persoRal leave time. IA aEIElitioR, "memo time" shall Rot be
authorizoa for more than ORO aay iR a pay perioa, Merricit@e· ~tuill ric)fl:)e~u_seC.Hor
tirrie off if using it memo time creates a negative memo time assrl:lal balance or if it is
not scheduled in advance with the supervisor.
5.5.4 Exempt personnel timesheets shall be submitted to Accounting in the Finance
Department no later than Friday of each week. In addition, exempt employees will not
receive overtime compensation, except as Extraordinary Services Compensation.
agreeEI to iR applisable bargaiRiRg ynit MOUs.
5.5.5 Timesheets must be completed in ink. Time worked shall be charged to the
appropriate work order category, and timesheets must be signed by both the
employee and supervisor. If an employee is unable to complete their timesheet due
to absence, the timesheet must be completed by the supervisor or designee (e.g.,
designee authorized by management to process employee's timesheet while on a
leave-of-absence) and submitted to timekeeping. When the employee returns to
work, another copy of the timesheet should be signed by both the employee and the
supervisor and sent to timekeeping.
5.5.6 Filling out another employee's timesheet, without management authorization, or
falsifying any timesheet is prohibited and may be grounds for disciplinary action, up to
and including termination.
5.6 Payday. Paychecks are distributed on the Wednesday immediately preceding the close of a
pay period. Paychecks received on Wednesday cover the period worked during the previous
pay period. If a payday falls on a holiday, paychecks will normally be distributed on the last
working day preceding the holiday. Employees who will not be at work on a payday may
request that their checks be held, forwarded to their supervisor, or mailed directly to their
residence. Unclaimed paychecks will be held in Accounting. Paychecks of individuals who
terminate their employment with OCSD, or are separated, will be mailed directly to them on
the next regular payday subsequent to the separation date unless other arrangements are
made to hold the check.
6.0 EXCEPTIONS
7.0 PROVISIONS AND CONDITIONS
Page 3 of 4
8.0 RELATED DOCUMENTS
8.1 Fair Labor Standards Act, as amended
8.2 Po1lcy:C40:00,·:1:;rt1-aordina-rv1SEi'rvtc~~·campensatioo
8.3 Policy 051.00, Pro Rata Benefits for Part-Time Employees
8.4 Policy F10.00, Rules of Conduct
8.5 Policy F20.00, Hours of Work -Non-exempt Employees
8.6 Professional Group MOU
8.7 Supervisor Group MOU
Page 4 of 4
Orange County
Sanitation District
Subject: Vehicle Usage Peliey
1.0 PURPOSE
Policy Number: F41.00
Effective Date: September~28, 2005
Oeteber 24, 2002
Approved by: Lisa L. Tomko
1.1 The purpose of this policy is to establish uniform guidelines and procedures for the
administration, utilization ef, and disposition of Orarig'et:Ounfy:S~nltatiori bistri~ (OCSD)
QistFiGt vehicles.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all b¢St> Fe€Jl:llaF employees ahd.StUdentIHtems regardless of their
organizational unit.
3.0 DEFINITIONS
3.1 OCSD DistFist's Vehicles are all ¢)C~$p DistFist owned cars, trucks~icarts,·:bfcycl~s, and
special motorized equipment.
Regular &mplevees aFe these empleyees wl=le Fe€J1:1laFly weFk en a yeaF r=e1:1nd 13asis, feF an
indefinite J:>eFied ef time Re€J1:1laF empleyees may 13e t1:1ll time eF par:t time
3~2 :: _· Emeraencv· for tll~f purposes oft§J$·poffcy''fs·a~'~i,UIJ~s~f or inj~ijiO,lvihifcar-=po~ier~:;~rpoo1
drive,ror car-pooler's· immediateJarnUY member, or:µnschedul~p ov~rtime req~~~ted .by the
employee's immediate supervisor.resulting in _th~~¢ar.-poolerroissi11g· ttl.~.:vanp~ol .or carpool
departure ~ime.
s.a·-:·Autfionzea ·or1vers·,a~e;a1t;iocs-or~mPJ.&yee$;1aHd?Siucienti1·flfern~w11e>:.·t>articli5af~;~rn.,t11a··oMv
~mploy~r pull Notice:'(EPN) _Pre>9~aro~J:xc:epticms ~re c)~tlinecl_:inj~ectlon s.~o.of lhis:poiicy~
3.4 AcithonzedP.assericiers B1:1siness G1:1ests are persons that are accompanied by QCSO
QistFiGt staff for the purpose of conducting business with PC$0 QistFiet.
3.5 Standby is time during which an employee is not required to be at the work location or at the
employee's residence but is required to be available and ready for immediate return to work.
3.6. .· Employef'.Pu11 ··NoUcerCEPN):'Program;Y,Jas·_est~pt'(§h~~-by1t~~::~~m9i'.flia•'bep~#~nt of :Mofor
v:~ie~-~~?1(D(V1V)J<?.:iP,~9y.ip~:'~rnP!RY:~,r,~·~11'.d·. r,,~9,a!B~,-~,~,rnqi~S,·;~(~.-a.mean~:QtjpJ:gmoting
dnver:;safety'througn -the onge>1n,g;r~yrew of ·employee: qn.ver.r~pQ(Ps~
3. 7 Hands.;Free Devices are accessories'that allow:the driver· (')fa vehicle to use __ wir~less
comrrmr:iication ·without holding :~n.y~e_guipment.
Page 1of8
4.0 POLICY
4.1 Vehicle Assignments
4.1.1 peso DistFiGt vehicles and equipment are assigned to departments depending
on their need for such vehicle(s) and/or equipment to accomplish their mission.
Division supervision shall designate or assign drivers or operators to specific
vehicle(s) for conducting peso DistFist business during working hours only.
4.1 .2 Pool vehicles are assigned to and managed by the Fleet Services Division for the
purpose of providing temporary assigned vehicles for OCS[) DistFiot business.
4.1.3 OCSD DistFiot vehicles and equipment shall not be loaned ~o contractors, other
agencies, cities, or other organizations or companies e~c:ept:iil~J)rovlde~c:[i9r.Jri
$ectio·n·,E?.~1-
4.2 Use of Personal Vehicles for OCSD DistFiot Business
4.2.1 The use of private ve~icles to 9onduct ocsb pistFiotbusiness shall be
reimbursed in.a~cordS:h~e-:\Nlfh':RC>.Jl~;pi16;Qc>~ifITT~y8,J) at the DistFiot mte not to
exceed the prevailing rate allowed by the Internal Revenue Service.
4.2.2 The employee's or.$tµ~ehf lntem's private vehicle insurance is the primary
insurance on the vehicle. OCS,D DistFiot shall not be responsible for the
replacement, or repair of any private vehicle, not otherwise owned, rented, or
leased by OCSD District and used to conducfQCStl> DistFiot business, if said
vehicle is damaged or destroyed during the course of such use. Prior to said use,
the employee's private vehicle shall have automobile insurance coverage that
meets .. o·.r.· e. x. ·c. eeds the, m .. inimumr~. '.q·"·.·~},~.~m .. ~!l .. _ts.'!'~!~ ! .. h .. ~~P~ .. -~,f.l,~rg~.~.!!.C,.,,1.i,~~.!~.l~,.t~,,.~~'.1,.~. ,, property damage. Dnve.rs are· respops1ble,·~orff)m~u110.g th~t!~J~Jr:P~!'$QO~lweti_19le
insurance' is vatid'for·business u~~~
4.3 Use of Pool Vehicles
4.3.1 Pool vehicles are maintained by Fleet Services Division for:
4.3.1.1 Use by any authorized a'nv~r employee requiring transportation to
conduct PCSQ District business on a trip-by-trip P.ti~~rrP~~ij~~ basis.
4.3.1.2 Use by any authorized a~ver employee OF while a~ regularly
assigned vehicle or mobile equipment is undergoing service or repairs.
4.3.1.3 Temporary 1:1se ey aRy departmoRtldivisioR as required for porformiRg its
missioR.
4.3.2 Pool vehicles should not be used for extended out-of-town business unless all
other options, least costly to OCSD DistFict, have been considered and
eliminated.
4.3.3 Pool vehicles may be reserved in a~v~nce on a first come first serve basis by
contacting the appropriate Fleet Services Divisib,n pool vehicle personnel.
4.3.4 Overnight use of an OQSD DistFiot pool vehicle must have prior approval by an
OCSD DistFiot manager level or above. The manager should consider all options
(i.e., using personal vehicle instead) and shall choose the option that is the least
Page 2of8
costly to #:le dp~p DistFist. An employee whose QG$P DistFiot business requires
an early morning departure will be allowed to check-out the vehicle the night prior
to the travel day.
4.3.5 Drivers should avoid parking pool vehicles overnight in a public parking facility
such as an airport. Costs for airport shuttles, p~blic transportation, or p~rsonal
vehicle use shall be reimbursed li,ij~cp9rd~oc.6'.w~h p9flqf¢1 to.ocf(tfiveJ)'.-as
part ef the emJ:>leyees travel e>EpeRse.
4.3.6 QCSD DistFiot vanpool vehicles are limited to the approved route and schedule as
assigned by the vanpool coordinator. Vanpool vehicles may be used for other
OQ$D Qistri6t purposes during working hours.
4.3.7 Vanpoolers and carpoolers may check out a pool vehicle in the event of an
emergency that requires their immediate 9rj:J~l~Y.E!CI departure from work. AA
emeF§eRcy shall be ElefineEI as, aREI enly as, illness OF inj1::1ry of the oaF J:>OOleF,
oaFpool EIFiveF, OF oaF pooleF's immediate family membeF, OF 1::1nsoheEl1::1leEI o•Jertime
roq1::1esteEI by the employee's immediate s1::113eFVisor res1::1ltin§ in the oaF J:>Oolor
missin§ the van13ool OF oaF13ool Elef)ar11::1re time.
4.3.8 Returned pool vehicle ye,ijtgT@§ shall be refueled when less than one-half tank of
fuel remains. All trash and personal items must be remove~ fro.m th~ poolyehicle.
Any mechanical problems shall be reported immediately i9:1Fleef Serv'c~s
Division.
4.4 qpso District Vehicle Parking
4.4.1 OCSD Qistri6t vehicles shall be parked and locked in tAeif assigned parking
spaces or designated areas.
4.4.2 bCSD District vehicle keys are to remain in a secured area.
4.4.3 OCSD District vehicles shall not be parked in visitor, carpool, vanpool, '*
handicapped parking spaces 9Fr~d zone~.
4.4.4 Employees with a Disabled Persons Parking Permit issued by the DMV shall be
authorized to use handicapped parking spaces for their assigned OC§() District
vehicle.
4.4.5 On call employees who take QCSD Qistri6t vehicles home shall park bCSD
Qistri6t vehicle in a garage, carport, or driveway If possibie and not on a private or
public street.
4.5 Employee Personal Vehicle Parking
4.5.1 Personal vehicles shall be parked in employee parking areas only.
4.5.2 ocso parkins;f ·permits;~halFB~~visit>1y: Clispl8:ye(J'·1~· pef~orii:i1·vehicles~
4.5.3 Personal vehicles shall not park in visitor,-et=-assigned parking spaces, or
adjacent to red or green CUrb$.
4.6 Driver Responsibility
4.6.1 License: While operating an 0CSD Qistri6t vehicle, or driving a personal vehicle,
on official OCSD District business, the driver must possess a valid State of
Page 3of8
California, Department of Motor Vehicles (OMV) Driver's License, and shall
comply with the reql!~~~-~(3~~s .. of t~~9f11ifo.r_niC!.Y~-~i~l.«? __ 9()~(3 ~.~~-1<?~~.1 ~~~~l~~io~s
and ordinanc~s. The oonsequenrie$ior:failirigt(>~eomply with aoy_l~w,: r~gt:ilation
br ordinance shall be th~· responsibility of the driver. Drivers required to operate a
commercial vehicle must possess a valid State of California, OMV Commercial
Driver's License with the proper endorsements.
4.6.2·': · DMY.Recordsi A1Lemployees ariCfst~denffnt~ms opfjratlng-bcso .vefiides ·on
public roadways shall be required,to, participat~"i'! ~he OMV E~N Program..
Employe,~s with ~ clas,sAor B ·lic~nf?.~ are ·~uttjmatica.Uy·ao.ded toJtJeJ;eN
Prograrni
4.6.2.1 Employeesamf Student ldf~,rns shall .complete'.& DMYauthon~tiOnJorroi
frhose .individljals ~ho·d(J;notcomplete1the' OMV: ~ut.h9rj:zatioriJgqn are
JJQt8.uthoriz~d:to:qperate;QQ$D<v,~hi.cl~~~
4.a.2~·:t::Recorcts·ofij1ass· A.aHC1:B.21lcel'lse~:;~fiaifit>e•i>re$ehte.<rt0 tt1e'._caHtorrlla
Highway_; patrol upon· request.
~.6.2~~ .. :A~·;p~ri·:at,·1~~:;~.~N:,pr~gr~ri)ii~~d$£?~st)~f,l;Yeiify·tMf:~~1.liuth~r:i~~g:'~.nv~r
h,asta·.valid ;dtivers1:lioense(s)'.and .that:the::lide'risef(s)ds. not·su~pe,rided,
restricted, or,re~oked~:Otherrlnform:atio~:l~portedJ)y DMV.·mayJ>9..u~edjo
deJermine. an :authorized driver's abilitY:fo op~rate a vehicle.
4.6.3 Private Use:
4.6.3.1 ocsb Distrist vehicles shall be used only for purposes of OCSP
9istA6t business and nQ~,!Q~.P~~~~l'l,~! ~~~i~~~~.Qfple~~~~~--~Y~~~y ··~--,
pf3rson whomsoever .. rJPi.$0:jnclude,s!!r,l)tftJs nO.t lirrdt~d 10/stdppil)g;for .a rriea1: bteE*§f-,ri.a~hing ,~~ii,@rsq~a(~r~~q,:ti_n1e~~!sU9n,,'a9tivJW4~~?a.ur:ln9,,
the course:6fofficial GCSE> 'businesti5(XlCSD:vehicles can :not: be .used
for the sole;purpos~ <>f Personal bus~riess •. No one excepf authorized .
drivers emraleyees and ~uttloriz~dj~)~s~~miers, a,~ ouiHned~lri~~Js
policy, their busiAess guests may be transported in an OO§P Distrist
vehicle at anytime.
4.6.3.2 The transportation of personal property within an QQS() Distrist vehicle
is prohibited at all times, inslt:1Eiing wl=tile the ~mf>leyee is.en al:lthorizea
On Call Eit:1ty. The exseptions inslt:1Eies ~Jtti tfl~. e~pe·P.~io~ :of an
employee•s lunch, §Yr:R ~-~§, or property whish is ordinarily used by the
employee while conducting they are on OCSD Distrist business.
4.6.4 Care of Vehicles: Each employee having custody of an Q'Q$t> Distrist vehicle
shall exercise due caution and prudence in the operation of such vehicle and
shall minimize the risk of damage to such vehicle. TRe Only OCSD Distrist related
stickers are authorized on QCSD QistA6t vehicles.
4.6.5 Smoking: Smoking is prohibited net permitted in QCS_D QistA6t owned vehicles.
4.6.6 Cell ph~nes:. While 9peratirig-an.dcso vehide.rtlle\driver;mlist.Ufiliz~ia~hands
rree deyic;~;'nd; Use.1~.Etpne,:tO.~C~;~r:,ypice •.S;Ct.i~~~~d C~ll~.ng~!~'tU_~·:Vi6~ffi:.i~~jOg·~
cell. phc>ne~flf ·a·hands:;free dev1ce·1s ·not ava1la~l~;1,the:;dnver:-must pull·ov~r.to. a
safe .location in order to· use a cell :phone. Haiidsifree devices'.shall be·prQvided
Page 4of8
irjs~lected OC$Pi;vehicle~. Tf:le 1:1se of sell 13hones anet otf:ler somm1:1nisations
de'lises is Ri§l=lly disoo1:1ra§oet 1:1nloss it is b1:1siness relatoet.
4.6.7 Vehicles not in Use: OCSb Distriot vehicles are for use during working hours
only ... OCSD SaiEi vehicles shall otherwise be parked and locked at assigned
PCSD QistfiGt facilities. QC$D Distriot vehicle keys shall remain in a secured
area. Keys for vehicles assigned to individuals may be kept overnight or during
the weekend by the individual. Tf:ley are to mal<e that vef:liole OCSD vehicles shall
be made available to an tReif assigned department by leavin§ the keys at tf:leir
work station if the employee who is assigned the OCSD vehicle will tl=loy are to be
gone for any extended period of time.
4.6.8 Stand-by Use: Q~Q$P QistfiGt vehicles may be taken home by those employees
on paid stand-by duty during the period of such stand-by duty. If possible, the
vehicle shall be parked in a garage, carport, or driveway and not on a private or
public street.. Vehicles shall only be used for the express purpose of responding
when called bacl(~o-worJ< to oall 01:1ts and not for personal purposes.
4.6.8.1 With the permission of the employee's manager, employees may use
assigned OC:SD Distriot vehicles in lieu of tAeif personal vehicles for
transportation to places/events to facilitate their availability during tReif
authorized $tand'."by. On Call et1:1ty. However, QCSb Distriot vehicles
may not be parked at or near bars, casinos, adult entertainment
establishments or other locations likely to reflect poorly on QQ.$0
Qistfist.
4.6.9 bess ef Status Changes Affecting Drivers License: Drivers of Oqs·b QistfiGt
vehicles are required to notify their supervisor, in writing, immediately upon ~
to work of reoeivin§ the following:
4.6.9.1 If their driver's license is revoked, suspended, restrictEiCI~ or expired.
4.6.9.2 If they are cited for a major moving violation, to include but not limited to
the following:
4.6.9.2.1 Driving under the influence of alcohol, drugs or a
combination of both.
4.6.9.2.2 Hit and run.
4.6.9.2.3 Reckless driving.
4.6.9.2.4 Leaving the scene of an accident.
4.6.9.2.5 Eluding or fleeing a police officer.
4.6.9.2.6 Speed contests or drag racing.
4.6.1 Q ~assengers: Qnly OpSD Di~tFi(Jt ~mployeos ~fil6_q(fz~~ :drivers:~p(f auttlgrizec;i
passengers,· as';Q,l.ltlined. in _lhlSLpQJfpy, aRd their bf1SiRf)SS guests are allowed. as
passen§ers in OQSD QistfiGt vehicles. Un~~thO.n~~~·.passengers.~inctuding· but
not limited to• hitcllnikers .~nd .fimiiy meinb~~'· arej:>i"cihibited in ·oQ$0 vehicles.
No family members or hitol=ll=likers are permitted. Drivers and passengers shall
use seat belts and shoulder restraints at all times while the vehicle is in motion.
Page 5of8
No driver shall allow or cause any passenger to ride in or on any vehicle other
than in a proper passenger seat equipped with legal seat belts.
4.6.1t . Ton Roads: i5rivers·are responsf6'e.fCir ensuHn~i1h~·:paYijl~nH>(anyt(>Ur<i~~
expensewhile·:<?Per:ating anJ)CS~_:,for:P8.l'.$Onal. v~higl~~: :rpll road exper1s~.$,Ci,~E:!
reimburs8ble.m~~~e~qost~.·wefe'.i11pj;t~a-wf'.1Ue .p$fformiti9:29ff~cial· ocSOi:9,9sJrj~~:~ Retjuests·19r~!~:~1'.·,r9ad:.rejmbµrsemilintJrilus~·,be:$ubmJtt~~~t:iprf~)frave1:;s~p~ii~~
Reimbursem~ntFqrm.
4.7 Safe Driving Habits and Vehicle Safety Practices
4.7.1 OCSD QistFiGt vehicle~ shall be ~e~r~J'.ed.J~ .. -~?~P~:i.~~~~~~b'.7'~:!~.~ppl.ic~.b,1~.~!.~~
and local. la\J\fs and ordman.ce~~ ~n1~~~QJ'1Sequ~nc~s.fpr;J~1h11g·to:,cornplyw1~p?'IJY la~~: regu,~~t~9n.~~§f:;proira~d~,:.s~9f![~s~~n>El!.~.d.ing:'.¢~~Ji§b'§:i9.n1e>IJirQad :fi~~§1t~f@.1
be ·the resp<>,n~lJlili!Y0()t1he driver:
4.7.2 Drivers are to drive defensively and maintain control of the vehicle at all times and
be aware of .tAeif personal limitations, road conditions, weather, visibility, and
traffic.
4.7.3 No driver shall QP~rafea'vebicf~)~t~~5$P.e~Ct exooee a greater~than i~
reasonable and prudent te>r th~<q9fi~IU1c>,li's, having due regard for w~attj~f;·~n~·
visibilify,the traffic on, and the surface and width of, the highway-:-ffi ~r.1~4r1 no
event shall a eriver maintain at a speed which exooees 13ostoe spoee limits or
endangers the safety of persons or property.
4.7.4 No person will operate an C>CSD Distriot vehicle while under the influence of
alcohol or illegal drugs. Also, over-the-counter or prescription medications that
are reasonably known to the employee to adversely influence the safe operation
of a vehicle are prohibited.
4.7.5 In inclement weather, rain, fog, etc., drivers are required to turn on vehicle
headlights.
4.7.6 Drivers are responsible for the secure placement and proportionate distribution
therein of the load to be transported. Whenever the load extends beyond the bed
or body of such vehicles, the driver will use clearance flags or signs, properly
displayed, indicating a long or wide load, as required by GMV pallfi>rn'fa Vehicle
Code.
4. 7. 7 Drivers are responsible to ensure that vehicles are not overloaded.
4.7.8 Whenever it is necessary to hook up a trailer to a truck, caution should be
exercised and, if needed, the assistance of a fellow employee shall be obtained.
4.8 Accident Reports
4.8.1 OCSD QistFiGt requires employees ana Student Interns to report a wide variety of
incidents ranging from loss of O.CSD Distriot property to injuries. All job related
incidents or any incident involving OCSD DistFist property is to be reported no
matter how slight.This Polioy requires Drivers and/or operators of vehicles and
equipment aretequired to complete a Vehicle Accident Report in the event of a
vehicle accident, vehicle damage, vehicle theft, vehicl,evap~alism, property
damag~ ,,,~f',~ .. ~~~~r y~h~~!e ~~,~~!'39.,~~9.i9~D~s. ,. ~Ei~~~~i'.~:9'9'inves(ig~tion~Jsm¥mb~ complete~fin·a¢cordance.with··SAF:;l;T¥;:;PoL-2o~;'·AcciClent':Jnv~stigations~
Page 6of8
·tuappoe
etn JS sessauw:• Aue Je s:1oqtt1Ru oue4do1ot pue 'sesso:1ppe 'satt1eu uietqQ
'AUeeltt100
ooue:1Rsu1 :1104t JO :1oqtt1Ru Ao11ed pue ':1eqtt1AU ouo4da1ot 'sso:1ppe 'ott1eN
'(9)010!401"•
JO e6ett1ep eq1:1osaa ·(s):1eqtt1Ru eie1a osuaou pue (s)o101401\ :104to JO uo1td1:1osoa
·(sso:1ppe AJ!JOf•) :1oqtt1Au osuoo11 S:IOA!:IG
·01s140A JO :1ouMe pue :10>\!:IP JO :1oqtt1Au euo4da1ot pue 'ssa:1ppe 'att1ef'4
:(9):10A!JP :104te 04t tl:JO:IJ US!tettl:IOJU! 6U!MOllOJ Ollt u1etqo
·tuap1ooe 04t Ol OA!te10:1
tlAeJ :10 oouo611eou JO ue1ss!tt1pe ue se um1et oq Aett1 tB4t stuott1atets Aue 0>1ett1 tou ea
·:1001110 O!IJE:lt eu1iee1ts0Au! e4t }(q p0:1eo10 l!tUA tuop1soe ue JS eueos
e a1.ea1 tau oa ·01011::101t ttlO:IJ 6u1>1eo1 ±ON 3t:IV SP!Rlt J! Alf'\10 posA aq Aett1 sa:1e1::J ·seuoo
O!j:Je:lt ltt!fl• ABN1pee:1 OlU JO US!'tJOS POIOAe:lt Ol:lt U! O:le ROA J! OU099 tUOP!OOe 0l:lt 0:1A90S
·ue101sA1::1a 1euos:1oa
w:.e :l!04t 09A Ot p02!:10l:ltRe em 'ttl:IOJ ,(JRflJI 1e!Jt9RPUI :IOJ UB!0!9A4d JS 00!0lf!)
s,00Ao1dtt10 LJe 4t1eaH 1fl .\te1es 4W" om LJo 01\ell OLIN• so0Ao1att1~ ·tuett1tee:1t
:IOJ :IOtU0!) 1eo1po~ :IOBU!P3 Ot Alt00:1!P 00Ao1dtt10 poJRfU! :IOJSUeJt :10 'tO!JtS!G as:>o
04t toeiuoo '1(JAfU! JO At!JOAOS Ollt lJO poseEj 9AO!J0S ue4t :I04t0 SO!JRful :10:::1
:A1dde netts 6U!•'AOJIOJ 0l:ll '.\t!::I01'c09 ksAfU! J6 9901p::!e60::1
'9:106LJ09Sed :IOfpLJe 9,~~~[l~r:J~-~ ~900AOfSttlO f.3!:1l9!G clSOQ et pO:l:IAOlJ! 90!JAflJ! :10::1
'LJO!tett1::11Juoo :101 AqpLJets
:ue1tett1:101u1 BLJ!A'10110J Ollt otets AoLJoee tuott100:101uo
Mel ate1:1ae:1dde :10 10:1tea AeM46!H e1LJ:10J!IB!) 04t AJ!teu AfOte!POtt1tt1! 'pe0:1 O!fqAd
e lJ0 tuop1ooe ue U! pOAIO>'<lJ! 0:1e ROA JI ':IOU!ttl r'11e4 JS 990fp:IBBO:I '08ett1ep lJ! StlRSO:I te4t
01014ot. te!JlS!a GSOO ue 6u11.10AU! tuep1ou1 LJe 0::1e tuawAee19 S!4l U! peU!JOJ:> se siuep1oee
010!40/\ ·01q1ssea SC US09 Se p01:J0SOJ eq l9Attl pLJe :IOlteW 9AO!J09 e 9Aeu.1e O:le StUOP!OO\f
'9llJ0P!OOe 011qowotAe JO t90j:J0 9!U:IOU090 19ue ett1ReJt 1eUO!tOU:IO 041 ttlOJj 01aeod
ne tOOtOJd d104 Ot si1qe4 6U!lt!JP 01es eu1p:1e60:1 90!9!10d P04S!IQBtSO se4 tO!JtS!G a~o,o 04±
·.A1dde 11e4s .Ao11od asnqv aoueisqns as:Jo 041 LI! paqposap
se lUOWOJ!nbaJ 6U!lSOl 6rup Ol.IJ. ·poJJR990 tUOP!99e Otfl 40!l:IM U! lJ!tf9 Ol:lt
DU!:1Aj9 J09!A:JOelR9 Ote!j90U:IU:I! JAOA Ot 1:1! pOUJRI aq 19fllJJ s1:1edat1 llJOP!OOV Of0!40f\
Take 13l=lotegFa13l=ls of tl=le aeeideAt seeAe if yot:1 OF aAetl=leF 0FR13loyee l=las aeeess
to a eaFReFa.
As SOOA as f30SSible fellowiAg aA aeeideAt iAVOl'JiAg a 60FRFROF6ial FROtOF vel=liele
tl=le OCSD DistFist will test foF aleol=lol aAd soAtFOlled st:1bstaAees foF easl=I dFiveF.
Follow l:lf3 witl=I tl=le wFitteA Vel=liele AeeideAt Re13ort d1::1FiAg tl=le sl=lift iA wl=liel=I tl=le
aesideAt 066l:IFF9d aAd Sl:lbFRit it to yol:IF iFRFRediate Sl:lf39FViSOF.
4.9 Responsibility Assignments
4.9.1 Employees
4.9.1.1 Employees are responsible for compliance with all provisions of this
policy when using 00$0 DistFist or private vehicles to conduct OP$P
DistFiet business. For purposes of this policy the actual driver and/or
operator of the vehicle or equipment shall be the responsible employee.
4.9.1.2 . EmployeE!.$:and Sfode~fil'lterrui:are ;r~~pqflslblS,;for't,h'Ei:~s~ 'of any
ticket,:.cit~tion,,·a~d/onal:Wi~therJiab11ity,}!~~it;fuE1Y·b~i:f~B9~~~:\~~e:tQ·:~ violation;9t:la~,,regulatJ9n;';and/or .ofdin~n9e:·a~:·~::t~$ul{r;Qftt.h~.ir
operatiofrof a vehicle.
4.8.2 Directors, Managers, and Supervisors
4.8.2.1 It is the responsibility of supervisory personnel to ensure the policies of
this document are understood by the employees under his or her
immediate supervision.
5.0 PROCEDURES
6.0 EXCEPTIONS
6.1: Contractors whomeet the.requirements of:this:policy may; il'l"\llmltecfsituatiOns;·usean
OCSD vehicle'with Department· Head Authorization.
7.0 PROVISIONS AND CONDITIONS
8.0 RELATED DOCUMENTS
8.1 : ·''OMV Employer Pull NoticeProgram
8~2 · California Vehicle Code
8~3 i''Policy c110.oo~Trave1
8.4 Poilcy E80.00, CellularTelephones
8.5 Policy F40.00, Use of District Property
Page 8of8
Orange County
Sanitation District
Subject: SUBSTANCE ABUSE
1.0 PURPOSE
Policy Number: F90.00
Effective Date: Sepie.rnber ~ij,'2bos
August 22, 2001
Supersedes:
Approved by: Lisa L. Tomko
1.1 To establish and maintain a drug and alcohol free workplace.
1.2 To reduce the incidence of accidental injury to person or property.
1.3 To reduce absenteeism, tardiness, and indifferent job performance.
1.4 To provide assistance towards rehabilitation for any employee who seeks GistFiGt
ocso~s help in overcoming addiction to, dependence on or problems with alcohol
or drugs.
1.5 To maintain a work environment free of alcohol and drug related performance
problems, accidents and injuries.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all District ~P$D employees, regardless of their organizational
unit. Additionally, all persons who perform any services for the Oistrist OCSD,
regardless of their employment status, are subject to the provisions of this policy while
on GistFiGt OCSD property or while performing GistFiGt ()CSD business.
3.0 DEFINITIONS
~·~·r·.::·cnmin~i ·o-rucfslatute·~ :Any·st8W~r1~aer~1:~cl'imi'n'l~i~t~wJnyoivinii:tH~ .. r,Tianutacfore,
distribution, .dispensation, µse; :or:po~session. of a):ontrolled s,ubstan~e..
3.2 Illegal Drugs -Any drug (a) that is not legally obtainable or (b) that is legally obtainable
but has not been legally obtained. The term includes, but is not limited to, cocaine,
crystal methamphetamine, heroin, PCP, and marijuana. It includes prescribed drugs
not legally obtained and prescribed drugs not being used for prescribed purposes. It
includes controlled substances as defined in the federal Controlled Substance Act. It
also includes any substance, which a person holds out to another as an illegal drug,
whether or not the substance itself is illegal.
3.3 Legal Drugs -Legal drugs include prescribed drugs and over-the-counter drugs, which
have been legally obtained and are being used for the purpose for which they were
prescribed and manufactured.
3.4 Need to Know -A term applied to persons who may reasonably be expected to base
administrative, managerial or supervisory activity on a given piece of information to
which they would not be otherwise entitled.
3.5 Paraphernalia -Drug paraphernalia may include pipes, hypodermic needles, bongs,
rolling papers, and other items used in the ingestion, consumption, or the preparation
Page I of 7
for consumption of illegal drugs.
3.6 Reasonable Suspicion -Reasonable suspicion of controlled substance or alcohol use
may be based on appropriate factors, including excessive absenteeism or attendance
problems, poor work performance or erratic behavior coupled with one or more of the
following signs: bloodshot or watery eyes; very large or very small pupils, runny nose,
excessive perspiration, nausea and vomiting, lack of coordination, slurred speech, or
unpredictable responses to ordinary requests.
3.7 Under the Influence -Having the presence of any detectable level of drugs in the body
or blood alcohol level greater than .02%.
4.0 POLICY
4.1 It is the policy of tRe District O.CSP to maintain a safe workpl(lce, whic~ is fre.e of
alCOhO~_an~ !llegal .P.9~~E3~Si9!:l ... Cl.~ci,(,or .. ~.s~,,~f .~r~g~~ ... QQ.S,~!i:~~!~f:rnly Cp~ffi!f!e~T~t) ........ .
achieving ·c:t;(:lrug free 'workplace ·and will :~~ptinu.e makh1g~fi.~go~~ iaith;~tt9.ttt9 achieve
a dru_g·free. we>i'kplace by_ g9nsi.stent~ ~nforging. ~\leryelem~1,1f.of. thi$.RQli¢Y-:
5.0 PROCEDURE
5.1 ILLEGAL DRUGS
5.1.1 The sale, purchase, offer to sell or purchase, use, tr:anster, mi:l.tiijJ.pt(Jre,
dl~_tribl.rtlon~ dlsperisatiCin, or possession of, or being under the influence of,
illegal drugs while on District QOSP business or time, or on, or in, Qistri6t
QCSb premises or property is prohibited.
5.1.2 No employee shall bring drug p(lraphernalia onto Gistf:iGt OCSP premises
or property or into District QCSI) vehicles.
5.2 OTHER DRUGS
5.2.1 No prescription drug shall be brought upon District PG.SD premises by any
person other than the person for whom the drug is prescribed by a licensed
medical practitioner, and shall be used only in the manner, combination,
and quantity prescribed~ The use, possession, sale, offer to sell, tr:anster, ijianUfacture; di~tributlori~-aisp~ns~tion, or purchase of legal drugs, except
under the conditions specifically permitted herein, is prohibited.
5.2.2 If an employee has any question or concern as to his or her ability to safely
or efficiently perform the job while taking a prescription drug or other
medication, the employee has an affirmative obligation to report the use of
that drug or medication to Safety & Emergency Response staff, Human
Resources staff, or his/her division management.
5.2.3 Upon receiving such notification from any employee, the District pcSb
shall contact tAe Or:an~e Gobin~· Sanitation District's ~CS.O's physician or
designee for a determination of the ability of the employee to work while
using that drug.
5.2.4 An employee may continue to work, while taking a legal drug, if the District
OC$b has determined, after consulting with the District's QQSE> physicians
or designee, that the employee does not pose a threat to the employee's
own safety or to the safety of co-workers, and that the employee's job
performance is not adversely affected by the legal drug. Otherwise, the
Page 2of7
employee may be required to take a leave of absence or comply with other
appropriate action determined by management.
5.2.5 An employee who fails to report legal drugs, that adversely affects his/her
behavior, to the employee's supervisor so that a determination of fitness to
work can be made, may be subject to disciplinary action, up to and
including termination.
5.3 ALCOHOL
5.3.1 No alcoholic beverages may be brought onto or consumed on DistFist
OCSD time or property.
6.0 PROHIBITION AGAINST EMPLOYEES HAVING ILLEGAL DRUGS OR ALCOHOL IN
THEIR BODIES DURING WORKING TIME
6.1 All employees of the DistFict OCSD are expected to report for work with no residue
or metabolite of illegal drugs in the body or blood alcohol level greater than .02%.
Employees must not have any residue or metabolite of illegal drugs in the body or
blood alcohol level greater than .02% at any time while on the job. Compliance
with these rules is considered an essential job qualification for all employees.
7.0 ENFORCEMENT OF RULE PROHIBITING EMPLOYEES FROM HAVING ILLEGAL
DRUGS OR ALCOHOL IN THEIR BODIES DURING WORK TIME
7.1 PRE-EMPLOYMENT ALCOHOUDRUG SCREENING
7.1.1 Prior to employment with the DistFicfbCSb, all final candidates shall be
required to pass an alcohol/drug screen test administered by a medical
facility designated by the DistFicrOQSD.
7 .1 .2 Any prospective employee refusing to submit to such examination shall not
be hired by the DistFict QCS().
7 .1.3 Any prospective employee failing the alcohol/drug screen test shall be
rejected from further consideration from employment with the DistFict
OCSDfor atleastsix (6) months~
7.2 REASONABLE SUSPICION ALCOHOUDRUG SCREENING
7 .2.1 When the DistFist OCSD has a reasonable suspicion that an employee is,
or may be, impaired or affected on the job by alcohol or illegal drugs, or
that alcohol or illegal drugs are, or may be, present in an employee's body
in violation of the rules set forth in this policy, the employee shall be
required to submit to an alcohol/drug screen test immediately upon
demand by the DistFiot OCSD.
7 .2.2 Refusal to submit to such a test amounts to insubordination and shall be
sufficient grounds for dismissal.
7.2.3 Any employee failing such a test, or who tampers with the test specimen,
shall be subject to dismissal from the DistFict OCSD.
7 .2.4 If a DistFict an OCSD manager or supervisor has a reasonable suspicion
that an employee ff; may~be impaired by drugs or alcohol While On DiStFict
OCSD business or on DistFict OCSD property, or otherwise in violation of
Page 3of7
this policy, the sup43rvisor, with approval of the Human Rosouroes Dirootor
DirectorofHuma.rfRe.scnirces, must refer that employee for a drug and
alcohol screening test.
7.2.5 If an employee has reasonable suspicion that another employee is
impaired by drugs or alcohol in such a manner as it may offer concern for
the safety and well-being of other employees or the public, or is otherwise
in violation of this policy, that employee has an o~ligation to immediately
bring the matter to the attention of a Distriot ~nt>CSP manager or
supervisor.
7.3 EMPLOYEE ASSISTANCE PROGRAM
7 .3.1 Distriot ocsb policy is to help employees with substance ~~LI.~~ problems
who voluntarily seek assistance. Accordingly, the Distriot ~CSP provides
a method by which employees may come to management without fear of
reprisal and seek assistance.
7 .3.2 Any employee who feels that he or she has developed an addiction to,
dependence upon or problem with the use of alcohol or drugs, is
encouraged to seek assistance. Assistance may be sought by writing in
confidence to, or asking for a personal appointment with the Human
RosouFGos Dirootor O.h-ectorof;tfuman~~esq~rce$.
7 .3.2.1 Each request for assistance shall be treated as confidential. Only
those persons with a need to know shall be made aware of such
requests.
7.4 Human Resources shall maintain contacts with local hospitals and/or employee
assistance organizations offering alcohol or drug treatment programs. Human
Resources shall refer employees seeking assistance to an appropriate treatment
organization.
7.5 Rehabilitation is the responsibility of the employee, but any employee seeking
medical attention for alcoholism or drug addiction shall be entitled to benefits
available under the Distriot's OCSO's group medical insurance plans with the
restrictions and limits stated in the applicable plan summary. Employees on
rehabilitation leave shall be subject to the extended Medical Leave and General
Leave of Absence provisions in tho Distriot's o:qgf):~~ Human Resources Policies
and Procedures.
7.6 To be eligible for continued employment after rehabilitation, the employee must
provide certification that he/she was continuously enrolled in a treatment program
and actively participated in that program.
7.6.1 Any employee suffering from an alcohol or drug problem who rejects
treatment or who leaves a treatment program prior to being properly
discharged therefrom shall b~q~ismissed from employment with the Oran~e
County Sanitation District OC$D.
7.7 Any employee returning to active employment from rehabilitation shall be required
to sign a Return to Work Agreement providing:
7.7.1 Unannounced testing for a period of minimum twelve (12) months to insure
that the employee is free from the alcohol or drug problem.
Page 4of7
7.7.2 Notice that failure of, or refusal to take, such a test during this period shall
constitute just cause for immediate dismissal of the employee.
7.7.3 Notice that the employee shall maintain an acceptable attendance and
performance record and comply with all other Distrist pc:so policies upon
his/her return to work. Failure to maintain an acceptable attendance and
performance record shall constitute just cause for immediate dismissal.
7 .8 No disciplinary action shall be taken again~t c:iny employee who, for the first
occurrence, comes forward to the Distrist ~~§W with his/her problem prior to 1) the
QistFiGt OCSD becoming aware of a possible violation of the drug and alcohol
policy, or 2) a requestby the Distrist QCS[) to undergo drug testing. However,
once the Distrist OCSD learns of a possible violation of the drug and alcohol policy
or requests the employee t~~s positiv~ 'in a to unc:Jergo drug testiAg, or if there is a
reoccurring problem, the Distrist OCSD is not obligated to grant the employee
General Leave for rehabilitation. All testing procedures shall be in conformance
with National Institute on Drug Abuse standards, and shall be conducted at a
reasonable time at the Distrist's OC,SD'§ expense.
8.0 INSPECTIONS
8.1 In order to insure the safety o.f the workplace and the workforce, and to protect and
preserve the Distrist'sQQ.$0'~ property, tt:le Distrist QCS.P may from time to time
inspect Distrist'~ ()Q§Q:§ vehicles, tool boxes, lockers, desks, file cabinets and
other Distrist QC$,I~ property.
8.1.1 These inspections may not be announced and employees should have no
expectation of privacy with respect to items brought onto Distrist OCSD
property and/or stored in such Distrist OCSD facilities.
8.1.2 It is a condition of employment for employees to cooperate with these
inspections. Refusal to consent to such an inspection amounts to
insubordination and may constitute cause for termination.
8.1.3 A representative from Human Resources must be present during any
inspection of Distrist OCSD property due to a reasonable suspicion that the
Substance Abuse policy has been violated.
~:ct;;'. .. J:>R'l.~~·CQl\lVICTIONS
e.1·. ·.: ,·-:-;~u~ocso.0.n?toyee~'.!?f6'J>ersonsj5eiform(n9'.l~•irvices torroc~~~wfj:o:ar~.collvictea
tinder .a. criminal drug ;~tute·for:aviolatioq;~P.~~ri._~,g in :thf3:,wpfk,pl~ce· _are,:reqtiire,p
to notify the Human .Resoµrces Departme.ntlo: vvl'.iling within five (5) calendar _day~
after such conviction.
e:2 · ····.::·<·;Pu~uant fo•th·~--·_oti.i9 .. f~e'Worl<p1ace·~t*j~'~TW~'ma~·::R.e~~:~rg~S,,:J)epartment-sfia11
n911fy:the ·appropriate':9~ntract~ng auth9~tW: \V,it~i,n :!ef1·.(1 Otqa,le.n.~aroc:t~YS·_ afte~,. , le.~fuing·.·of·ari.indivi~u~l;~·drug;conyictjgtj'.:trpffi::~ithef.'th~;!~diy~.g~a],c)r:a11y·:Qther
source. Within 1hirfy:(~()) ealendar-days·:of l~aming of a'ri :individual's. drug
conviction, ocso shalMake ·appropriate cqrrectiv~tfiction.
10.0 ·oEPARTMENTOFTRANSPORTATtON REGULATIONS
-10.1 ·· -. Every driver who op~-~~es·a corrirtj~l'~@.[ljg~§f:;V~~Wle itji,il'lt~~t~~~foHntrastat~.
coirtrn~rce, and ·is ~u.bjeC.t:~9.the ;corrimercitif:i~nve,rslic9-ns~;t~q~irements of the
Department of Tra11~PQ~JiQO, Federal Hi96w~Y:A.etrniriistr~ti9..n?¢ER.P~rt ~82 is
Page 5of7
subject10;09si.tiO~nti~Drug.:·~cfAiooho1 :P.rt)9~(n~.()cso•~iu:01i~1J'feiftiaf~i.1 .....
alcoho.l,or ~on!rolle~:l-subst.ar1¢~~}t~s~ing ·9onduc~~c:J. t;1nderthe·:~uq~~tl9~.Apus.e.
and Alcohol;Misuse f>lan corrjpli~~'With the. pr9Q~pµres::~et fortn':irf~Eft.Part4P~
11.0. DRUCfFREE AWARENESS PROGRAM
· ocso shall':require':all ·eriiploy~e~ fo-attend .. biarihuaFPreveritiofr(>rWorl<piace
Violence TJ'8ining which sh~UinClude a modul~ on, [)rug ·Free :Awar~tiesslnformitjg employee~'apo~t·~he dangers,f;9f~riJg :~buse .ir1~in~}V\fgrl<µJaq~~({j},Q.~Q~s·:~u~~t~h9~ Ati,use .POlicyi;avail~b·ia.couns~fing~ rehatiilitEitiqn;~:~rjCJ·,~mJ'le>Ye.~:a$$.ista11Jje
programs. available 1througtf ()Q~[), arid ·the ·per}atties foJ vlolating;J~).QSD's
Substance Abuse .·Policy.
13.0 EFFECTl'J~ DATE
ta~t·:'~::,,This polisy is ef:festivo immediately 1:JpOA Aotise to employees. Eash s1:JrreRt
employee shall ee fl:JrRishod a sopy of this polisy aAd shall sigR a reseipt for same.
Later hired em13loyeos shall ee f1:Jmished a so13y at or eefore the time of hiriAg
12.0. :POLICY DISTRIBUTION
12:1· r-:;, ;popies.•pfthis ·pollCY,·shali.be cil~¥9"mlhaf~µ•:tqipij_rr,nJ;empioye~$~iWoO:iririij~1 Pr~vention1of.'\t\fc>'rkpiace VioleriC,e\tl'$inin9\·8.pei1;J'fetlttire:C:t:'.~rnPi9Y'Ci~$~if1.1;NQw
Erriployee·.o·nehtation. Acknowi~dgement·torrn~;~ti,~,11.1be,lnci1.~d~~1W~ththe:poll~y
copy to .be.sighed .by employees·and,filedin'pe~on~el fil~s. · Temponirylcontraqt
workers shall receive ·a copy of this policy and an acknowledgmenffOtT.n thr()ugn
their employers~ .. Sighed temporc:lry/contract.worker:acknowledgermmt:forms 'shaO
be-filed in tl'l~Hµ,nan Resour~~s Departrnerit
13.0 DISCIPLINARY ACTION
13.1 Except as otherwise provided in Section 7 .3, violation of the Substance Abuse
Policy may result in disciplinary action, up to and including termination, even for a
first offense.
14.0 EXCEPTIONS
14.1 If any portion of this policy is found to be at variance with the provisions of an
approved Memorandum of Understanding (MOU), the MOU provisions shall prevail
with respect to employees in the affected bargaining unit.
15.0 PROVISIONS AND CONDITIONS
15.1 No employee shall be eligible for rehabilitation under the employee assistance
program more than one time. The reoccurrence of an alcohol or drug problem shall
be cause for dismissal.
16.0 RELATED DOCUMENTS
16~1 . Drug Free.:\JVorkplace 'Aet
16.2 Substance Abuse Policy Acknowledgement Forms
16.3 , 1~11=rPolicy-B1so.oo~·Recruitment
1·a.4·x 'FIR'lf>o1icy·oaq~_()q·:::1:mpl()y~e:.~5s1s"fanctf F>rd~Jram
Page 6of7
H6~5, '. ']iFfRq~ipyF10.b6 . .::J~ijle's ofC<indU,ct
16.6 HR.Policy F41.00-Vehicle Usage
t6.7 --HR Policy F70.oo .;.. Di~cipline
fftta··.. , l.o~t:S.01,operationEF~na·Maiht~n~nc~JU11it•Mou
16~9 · Adrrlinistrative and Cierical · Unif MbO
16.1 O Engineering Unit MOU
~e'd1. ·-·rechnlcal'senlices :t.JnitMou
1a.12 Protessiona1 Group.Mou
.16.1'3 sa.i'pervisor Group Mqu.
Page 7of7
Orange County
Sanitation District
Subject: Smoking
1.0 PURPOSE
Policy Number: F100.00
Effective Date: se .. te;mbe"f:28<2oos p . ···-----·· . "' ...
Desember 15, 2004
Supersedes: Decemb~r15,2004
Approved by: Lisa L. Tomko
1 .1 This policy has been developed to protect employees and the general public from the
dari~ers of assosiated w.itt:l second-h~n~ ~moke and ,tti~J>,Qterit.i~i 11~~ti:f§:'.~ssociat8d
WJfti.;ig'[ijlion ·sources· rl~~f pl~nt .pi,og~§s~c(>'rnporieritS~
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all Orange County Sanitation District (OCSD) employees,
contractors, and the general public who are in or on OCSD property.
3.0 DEFINITIONS
3.1 Public Building -A building owned and occupied, or leased and occupied, by the State,
County, City, City and County, or a California College District. In or inside a public
building includes all indoor areas of the public building, except for covered parking lots.
3.2 .. t=>i~nt' •• Process;bomponenf·~.8n.·are~'N~fructure·.qtp1~~[wltnlh .. •ppso;!~cJllfies Where
\iVa$.tewciter;· biosoliets; digestef ;gas\;:~rigtlt'are ·.cqfleQf~~i:~lreate,d,. st6red~~~ransp9rted:or
discharged.
3.3 OCSDVehicles ~All OCSD owned:cars, trucks, ciirts,~bicycles~ancf speciai:motori2'.ed
equiprnent.
4.0 POLICY
4.1 GENERAL INFORMATION
4.1.1 OCSD provides designated smoking and ·n,ofit$moklng areas that meet
regulatory requirements and the operational needs of the organization. This
policy defines employee, contractor, and general public conduct, as related to
smoking, in or on OCSD property.
4.2 EMPLOYEE, CONTRACTOR AND PUBLIC CONDUCT
4.2.1 No OCSD employee, contractor, or member of the general public shaUsmoke
any to~ac~o prf?ci.U~t i~}m QS.SD _public ~ui,1.~i[l,9, .~.r.,y~~icle; 'Afit~!.~ 2~ feetofati
pperable ,qoorq~i vvinqo.w·of.::~fl:pcso QlJ1.~9mg;~w~tim 20 fe~t;9t:a,;J?yllding ,. -: .. , vent.ilati()n:sy$te1'1l:intake;;iwittlin··29,,eetc?fli~9Mi~~e~·tJesig~~t~d~tJ<:)h•srnokirjgi~9~ ..
within 20'fe~t'6fa:plant proces$. C()rriponent::·'.;iSrnoklrig is permittecJ within oosp'
facilities in :ali de$ignated. areas~ parking lots;:and .road~ays,'and;fr},any. open. area
that is a distance greaterthari 20 feet frorn ·a :Process.area.or:buil(jing. SR=tokin~
is pFot:lieiteEI at OCSQ exsept in designated aFeas tt:lat aFe sleaFly pestee.
Page I of 3
4.2.2 Failure to comply with the requirements of this policy shall result in disciplinary
action, which includes, but is not limited to:
4.2.2.1 Progressive disciplinary action for OCSD employees, which may result in
termination for repeated violations.
4.2.2.2 Removal of contractor personnel from an OCSD public building, facility
or vehicle and/or termination of the contract.
4.2.2.3 Removal of a member of the general public from the impacted OCSD
public building or vehicle.
4.2.2.4 ·prohibltionfrdm .coming a·nfot>Cso:sites.
4.3 LOCATING DESIGNATED SMOKING AREAS
4.3.1 All designated smoking areas shall be located outdoors and at least 20 f(;)et from
a main entrance, exit, and/or operabl~ window of~n'OCSb 'b.uilcflfig;~W~ti'n :?P
teetot a: buildingventilatioh systeoojnt~~~,or~~'~D~ p,fQQ.~~,_cp_ljl_pi!n~nt.
All etesignateet smoking aFeas st:iall be slearly i:>ostee:t ane:t e:telineateet 13y OGSD.
4.3.2 Ash trays will be provided at east:i designated smoking area Wh~~ffii'Qe$si:i!}/
and will be maintained by OCSD.
5.0 PROCEDURE
5.1 RECORDKEEPING
5.1.1 A database within the Computer Maintenance Management System
(CMMS) shall be implemented to properly maintain the location of all
designated smoking areas at OCSD.
6.0 EXCEPTIONS
7.0 PROVISIONS AND CONDITIONS
8.0 RELATED DOCUMENTS
8.1 Code of Federal Regulations, Title 49 (Subpart D)
8.2 California Government Code, Sections 7597-7598
8.3 California Labor Code, Sections 6400-6413.5
8.4 Policy F41 .00, Vehicle Usage
8.5 Policy F70.00, Discipline
8.6 Local 501 , Operations and Maintenance Unit MOU
8.7 Administrative and Clerical Unit MOU
8.8 Engineering Unit MOU
Page 2of3
nOll\I dnOJE) JOS!AJadnS ~ ~ ·9
noll\I dnoJ91euo1ssa10Jd o~·e
nOll\l J!UO S00!AJ0S ll?O!U408J. 5·9
RESOLUTION NO. OCSD 05-23
AMENDING RESOLUTION NO. OCSD 98-33
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE ORANGE
COUNTY SANITATION DISTRICT AMENDING THE HUMAN RESOURCES
POLICIES AND PROCEDURES
*****************************
The Board of Directors of the Orange County Sanitation District,
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1 : That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
deleting Policy No. E30.00, Human Resources Records, set forth in Attachment No. 1, attached
hereto and incorporated herein by reference.
Section 2: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
adding Policy No. E31.00, Privacy Information and Human Resources Records, set fourth in
Attachment No. 2, attached hereto and incorporated herein by reference.
Section 3: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No. F20. 10, Hours of Work -Exempt Employees, set fourth in Attachment No.
3, attached hereto and incorporated herein by reference.
Section 4: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No. F41.00, Vehicle Usage, set fourth in Attachment No. 4, attached hereto
and incorporated herein by reference.
Section 5: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No. F90.00, Substance Abuse, set fourth in Attachment No. 5, attached hereto
and incorporated herein by reference.
Section 6: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No. F100.00, Smoking, set fourth in Attachment No. 6, attached hereto and
incorporated herein by reference.
Section 7: That all other terms and conditions of Resolution No. OCSD 98-33, as
previously recommended, shall remain in full force and effect.
Section 8: That all future amendments to Resolution No. OCSD 98-33 be made by
Resolution.
PASSED AND ADOPTED at a regular meeting held September 28, 2005.
Chair
ATTEST:
Board Secretary
FAHR COMMIITEE Meeting Date To Bd. of Dir.
09/14/05 09/28/05
AGENDA REPORT Item Number Item Number
FAHR05-74 14(e)
Orange County Sanitation District
FROM: Michael D. White, Acting Director of Finance/Treasurer
SUBJECT: SWAP REPORT FOR THE QUARTER ENDED JUNE 30, 2005
GENERAL MANAGER'S RECOMMENDATION
Receive and file Swap Report for the quarter ended June 30, 2005.
SUMMARY
In August 2003, the Committee approved an Interest Rate Exchange Agreement Policy that
provides guidelines for the use of hedging products including swaps, caps, floors, collars, options,
and other similar financial instruments (collectively, "hedging products") in connection with the
financial exposure of the District, including interest rate exposure. As required by this policy,
following are the quarterly monitoring and reporting requirements and status at June 30, 2005:
Requirement
Highlight all material changes to hedging product agreements including counterparty downgrades
and/or terminations.
Results:
The District currently utilizes two hedging product agreements, the AIG Swap agreement and the
Soc Gen Swap Agreement. The AIG Swap agreement was originally entered into in
October 1, 1992 in order to convert the Refunding Certificates of Participation, 1992 Series (the
"1992 Certificates") to a fixed rate obligation. There have been no material changes to the
agreement. American International Group, lnc.'s current ratings are AAA and Aaa from Standard
and Poor's and Moody's, respectively.
The Soc Gen Swap Agreement was originally entered into in September 1, 1993, in order to
convert the Refunding Certificates of Participation, 1993 Series (the "1993 Certificates) to a fixed
rate obligation. There have been no material changes to the agreement. Soc Gen's current
ratings are AA-and Aa3 from Standard and Poor's and Moody's, respectively.
Requirement
Summarize any new hedging products entered into by the District since the last report.
Results:
No new hedging products have been entered into by the District since the last report covering the
period ended March 31 , 2005. As stated above, the District utilizes only two hedging product
agreements, the AIG Swap agreement entered into in 1992, and the Soc Gen Swap Agreement,
entered into in 1993.
Requirement
Summarize any planned hedging product transactions and the impact of such transactions on the
District; a description of each outstanding Hedging Product agreement, including a summary of its
terms and conditions, the notional amount, volume, rates, maturity, the estimated market value of
each agreement, the method of procurement (competitive or negotiated), and the full name,
description and credit ratings of the agreement's counterparty and if necessary, its applicable
guarantor.
Results:
The District currently is not planning any additional hedging product transactions at this time.
Requirement
List any amounts which were required to be paid and received, and any amounts which actually
were paid and received under each outstanding hedging product over the last quarter;
Results:
Following are the amounts that were actually paid and received under the District's two swap
agreements. All amounts required to be paid and received were actually paid and received.
April
Paid by the District to the Swap Provider
Paid by the Swap Provider on behalf of the District
May
Paid by the District to the Swap Provider
Paid by the Swap Provider on behalf of the District
June
Paid by the District to the Swap Provider
Paid by the Swap Provider on behalf of the District
Requirement
1992
Certificates
AIG Swap
1993
Certificates
Soc Gen Swap
$159,790.00
$ (87,060.78)
$159,790.00
$ (100,148.15)
$159,790.00
$ (77,049.42)
List any credit enhancement, liquidity facility or reserves associated therewith including an
accounting of all costs and expenses incurred, whether or not in conjunction with the procurement
of credit enhancement or liquidity facilities under each outstanding Hedging Product.
Results:
Credit Enhancements, liquidity facility or reserves associated with the 1992 Certificates AIG Swap:
-Lloyds Bank Standby Purchase Agreement Commitment fees for the quarter
ended April 30, 2005: $65,748.71
H:ldept\agenda\Board Agenda Repons\2005 Board Agenda & Agenda Repons\0905\llem 14(e).SWAP Otrty Repon.doc
Revised: 06/04/03 Page 2
Credit Enhancements, liquidity facility or reserves associated with the 1993 Certificates Soc Gen
Swap:
-Soc Gen Irrevocable Letter of Credit Fee: No costs or expenses were incurred during the
quarter ended June 30, 2005.
Credit Enhancements, liquidity facility or reserves associated with the 2000 Certificates:
-Dexia Public Finance Bank Standby Certificate Purchase Agreement
Commitment Fee for the quarter ended April 30, 2005: $69,646.01
Requirement
An assessment of the counterparty risk, termination risk, and other risks associated therewith,
which shall include the value of the collateral posted by counterparties and the District, the
aggregate marked-to-market value for each counterparty and relative exposure compared to other
counterparties, and a calculation of the District's Value at Risk for each counterparty.
Results:
The counter party risk and termination risk has been calculated by Public Resources Advisory
Group (PRAG). PRAG used the value at risk methodology in determining the county party risk at
maximum exposure over the term of the Swap Agreements. Counterparty exposure limits are
important because they create diversification, so if any one counterparty goes bankrupt, the
District's total loss would be limited to only one counterparty. The termination risk is what the
District would have to pay the counterparty upon a termination of the Swap Agreement. Following
are the counterparty risk and termination risk as of June 30, 2005:
1992
Certificates
AIG Swap
1993
Certificates
Soc Gen Swap
Counterparty Risk
Termination Risk
$ 86, 170 $2, 178,327
$10,915, 121 $3,432, 176
Requirement
The report shall also include a copy of this Policy in the quarter after it is adopted or subsequently
modified.
Results:
No modifications have been made to the Policy since its adoption.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 14(e).SWAP Otrty Report.doc
Revised: 06/04/03 Page3
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
D This item has been budgeted. (Line item: ) D This item has been budgeted, but there are insufficient funds. D This item has not been budgeted.
~ Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ATTACHMENTS
None.
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 14(e).SWAP Qtrly Report.doc
Revised: 06/04/03
i
Page4
i, • FAHR COMMITTEE Meeting Date To Bel. of Dir .
9/14/05 9/28/05
AGENDA REPORT Item Number Item Number
FAHR05-75 14(f)
Orange County Sanitation District
FROM: Michael D. White, Acting Director of Financerrreasurer
SUBJECT: QUARTERLY INVESTMENT MANAGEMENT PROGRAM REPORT FOR
THE PERIOD APRIL 1, 2005 THROUGH JUNE 30, 2005
GENERAL MANAGER'S RECOMMENDATION
Receive and file the Quarterly Investment Management Program Report for the period
April 1, 2005 through June 30, 2005.
SUMMARY
Section 15.0 of the District's Investment Policy includes monthly and quarterly reporting
requirements for the District's two investment portfolios. These two funds, the "Liquid
Operating Monies," and the "Long-Term Operating Monies" are managed by PIMCO,
the District's external money manager.
The ongoing monitoring of the District's investment program by staff and Callan
Associates, the District's independent investment advisor, indicates that the District's
investments are in compliance with the District's adopted Investment Policy and the
California Government Code, and that overall performance has tracked with benchmark
indices. In addition, sufficient liquidity and anticipated revenues are available for the
District to meet budgeted expenditures for the next six months. The District's portfolios
do not include any reverse repurchase agreements or derivative securities.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
D This item has been budgeted. (Line item: )
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
~ Not applicable (information item)
H:ldept\agenda\Board Agenda Repons\2005 Board Agenda & Agenda Repons\0905\ltem 14(1).0trly lnvst Mgmt Program.doc
Revised: 8120/98 Page 1
ADDITIONAL INFORMATION
Performance Reports
The Quarterly Strategy Review, prepared by PIMCO, and the Investment Measurement
Service Quarterly Review, prepared by Callan Associates, are attached for reference.
Also attached are Long-Term and Liquid Operating Monies Summary of Performance
Data and Portfolio Statistics charts that depict the performance results, estimated yield
and duration, credit quality, and sector diversification of the District's portfolios, as of
March 31 , 2005 and June 30, 2005. The Liquid Operating Monies portfolio, with an
average maturity of 50 days, consists entirely of cash equivalent investments such as
U.S. Treasuries and corporate discount notes.
Portfolio Performance Summary
The following table presents a performance summary of the District's portfolios as
compared to their benchmarks for the period April 1 through June 30, 2005.
Portfolio Performance Summary
Quarter Ended June 30, 2005
Liquid Operating Monies (%) Long-Term Operating Monies(%)
Total Rate
of Return Benchmark<1>
Total Rate of
Return Benchmark11>
3 Months 0.72 0.69 1.75 1.67
6 Months 1.35 1.26 1.45 1.02
9 Months 1.79 1.71 1.77 1.17
12 Months 2.15 2.04 3.36 2.89
Since inception 30 Sept. 95 4.21 3.78 5.90 5.76
Market Value $39.1M $342.8M
Average Quality "AAA" "AAA"
Current Yield (%) 2.3 3.9
Estimated Yield to Maturity (%) 3.1 4.1
Quarterly Deposits (Withdrawals) $-35.0M $OM
Estimated Annual Income $1.2M $13.1M
(1) Benchmarks:
• Liquid Operating Portfolio: 3-Month Treasury Bill Index
• Long-Term Operating Portfolio: Merrill Lynch Corp/Govt. 1-5 Year Bond Index
Portfolio Market Values
Comparative marked-to-market quarter-end portfolio values are shown in the following
table, and in the attached bar chart.
Liquid Long-Term
Quarter Operating Operating
Ending Monies (SM) Monies (SM)
_30S~~.04 72.8 363.1
31 Dec. 04 73.1 368.0
~1 Mar.05 73.5 336.9
30 Jun. 05 39.1 342.8
H:ldeptlagenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 14(1).0trly lnvst Mgrm Program.doc
Revised: 8/20/98 Page2
-,
/! District's Investment Account Balances as of June 30, 2005
4i
Book Balances Estimated
Investment Accounts June 30, 2005 Yield(%)
State of Calif. LAIF $ 30,332,936 2.97
Union Bank Checking Account 962,305 2.77
Union Bank Overnight Sweep Account 8,489,000 2.34
PIMCO -Short-term Portfolio 38,860,995 3.12
PIMCO -Long-term Portfolio 339,301,397 4.13
Petty Cash 4.000 N/A
TOTAL $417 950 633 3.92
Debt Service Reserves w/Trustees S 63 952 Z98 3.94
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. Historical Yield Curve Graph
2. PIMCO Quarterly Report
3. Quarter End Portfolio Market Value Bar Chart
4. Summary of Performance Data and Portfolio Statistics -Liquid Operating Monies
5. Summary of Performance Data and Portfolio Statistics -L-T Operating Monies
6. Investment Transactions and Balances in LAIF
7. Asset Summary by Asset Type -Liquid Operating Portfolio
8. Asset Summary by Asset Type -Long Term Portfolio
9. Investment Listing of Liquid Operating and L-T Portfolios (Yield Analysis Report).
10. Callan Report (separate bound document)
11. PIMCO Report (separate bound document)
H:\dept\agenda\Board Agenda Reports\2005 Board Agenda & Agenda Reports\0905\ltem 14(f).Otrly lnvst Mgmt Program.doc
Revised: 8/20/98 Page3
5.50 T··--
5.25 l --
5.00 -1
fH1ST0RicAL YIELD cURvE I
4.75 --+-------------
4.50 ----------·----~-. ----------· -~-------------------~
-i~~i J=----------·-=-•b::>--C""Ct: •
~ 3.25 m 3.oo-r---=--~~------::;~Y-------~---------------~
>= 2.75
H~ i-t----····-------------------------------------
1.75 --·--------·· --·---· ------------~------·~···-~------------··----···-·-· -----------·--. ·-----
1.50
1.25-r---------------------------------~
~:~~ T--··-·--
o.5o J · , ,
0 E
(")
0 E
co
... >i
~
... >i
N
... >i
(")
... >i
'll:t
... >i r.n
... >i ......
[--+-31-Dec-04 -.-31-Mar-05 ~30-Jun-05 l
... >i
0 ~
... >i
0 N
... >i
0 (")
~\ ~
July 25, 2005
Mr. Mike White. CPA
ControlJer
Orange County Sanitation District
Administration Building
10844 Ellis A venue
Fountain Valley, CA 92708-7018
Re: 2nd Quarter 2005 Rcpon
Dear Mike:
PIM C 0
84i) N~"J1<'" Cl!tlrn Driv!
Suitt JOO
s .. w~rt ~~.CA 9:~.)
Tel ~9~.WX·
fai.;· 9"19.72C.1~7fl
The following is a description of events in the bond markets during the 2'1d quarter of 2005 in
addition to an analysis of the strategies undertaken in the Orange Cooney Sanitation District's
long-tenn and liquid portfolios over the period. We have aJso included a section on sti-ategies to
be pursued in your portfolios during the coming months.
Bond Market Recap:
Bonds Rally As Rates Fall and Risk Appetites Return
Bonds rallied worldwide during the r.c:cond quarter as interest rates fell. risk appetites for credit-
sensitivc assets revived and signs of an economic slowdown emerged. Fixed income returns were
also positive for the first half of 2005 as second quarter gains more than offset losses in the
previous quaner. The Lehman Brothers Aggregate Bond Index, a widely used index of high-grade
U.S. bonds~ gained 3 .0 l percent during the second quarter. The benchmark ten-year Treasury yield
ended the quancr at 3.92 percent, 57 basis points lower than at the end of the previous period.
The unusual phenomenon of falling longer-dated yields amid a tightc:ning cycle by the Federal
Reserve -dubbed a "conundrum'' by Fed Chairman Greenspan -continued into the second
quaner. The difference between t\vo-year and lcn·year Treasury yields narrowed sharply to only
28 basis points. by quarter-end, compared to 70 basis points at the end of the first quarter and I JS
basis points at ycar~end 2004. This flattening of the yield curve cut the profitability of the ··carry
trade"' whereby investors and financial institutions borrow at low short-t~rm rates to finance
purchases of higher yicJding, longer-tenn bonds.
Bond investors struggled to explain the ·~conundrum•·. but several factors seemed to be in play.
First, inflation remained relatively contained while weakness in manufacturing data signaled that
the U.S. economy could be poised to slow down. Second, Asian central banks kept buying
Treasuries to keep their currencies from appreciating versus the U.S. dollar, thereby helping
finance the U.S. trade deficit. Finally, demand from U.S. pension funds looking to reduce the
mismatch between the duration of their assets and liabilities provided support for longer-dated
bonds.
Nowhere was the global appetite for bonds more evident than in the recovery of crediMensitivc
assets such as corporate and emerging market bonds after a difficult April. Anticipated ratings
downgrades of General Motors and Ford created anxiety among investors across credit markets
early in the period. The nervousness faded later in the quarter, however, as a hunger for extra yield
in a low interest rate environment sparked renewed demand for these sectors.
Major Bond Sectors See Posithte Results in Second Quarter
The following summarizes sector returns in the second quarter:
• Mortgage-backed securities modestly outperfonned liktHJ.uration Treasuries. Falling rates
heightened concern about prcpa)111ent risk earJy in the period, pushing yield premiums wider.
Interest rate volatility moderatc:d later in the quarter, however. and mongages' yield advantage
helped relative performance. Lower coupons, which are less exposed to prepayments,
outpaced higher coupons over the quarter.
• Corporates lagged Treasuries of similar duration after a poor start to the quarter. Corpora1es
were initially weighed down by weakness in the: auto sector and news of bond-unfriendly
corporate restructurings. Wider credit premiums attracted buyers to autos and other credits
later in the quarter.
• Less volatile fixed income asset classes such as real return and municipal bonds
underpcrfonncd Treasuries during the quaner. Municipal bonds tend to lag Treasuries when
rates fall. In the case of TIPS, breakeven inflation levels declined during the quarter as yields
on nominal bonds fell more than real yields on TIPS of comparable maturity.
• Emerging market bonds were the best perfonning fixed income sector for the quarter,
bouncing back strongly after volatility in credit markets hurt returns early in the quarter.
Continued cash inflows from dedicated institutional investors attracted to the sector's strong
credit fundamentals supponed the market, as did short covering by hedge funds.
• Most government bond market.ct outside the U.S. perfonned near or better than Treasuries as
yields fell around the world. Concern about a potential slowdown in the European economy
raised the possibility that the European Central Bank would suon begin cutting rates.
Rcnccting pessimism about growth prospects, European intennediate maturity yields were a.c;
much as 120 basis points below their U.S. counterparts by quarter-end.
Performance Attribution:
Long-Term PorCfolio
The Long-Tenn portfolio that PIMCO manages on behalf of Orange County Sanitation Distric..-t
rctumed 1.45 percent over the quarter, outperfonning the Merrill L)11ch l-5 year Government
Corporate Index by 43 basis points. The following points smnmarize returns for the quarter ended
June JO. 2005.
•
•
Your portfolio outperformed its benchmark for the quarter and the year-to-date
Important contributors to performance were:
»A corporate undenveight amid concern early in the quarter about the auto sector and
corporate re~tructurings
~ Asset·backed bonds, which pro~·ided incremental yield tO the portfolio
'Mongage security selection
• The following strategies detracted from returns:
>Real retum bond~ which underperfonned as nominal yields fell more than real yields
• The following strategies were neutral for perfonnance:
~Yield curve positioning and duration near the index
Liquid PorlfoJio
The Liquid portfolio that PIMCO manages on behalf of Orange County Sanitation District
generated a total return of 1.35 percent during the quartert outperfonning the J .. month Treasury
Bill lnde.x by 9 basis points. The following points summarize returns for the period ending June
30,2005
• Your portfolio outperformed the index for the quarter and the yeaMo-date
• hnportant contributors to performance were:
)ii-Limited interest rate exposure in the U.S., which tempered the negative impact of rising
shorMenn rates
>Shorter duration corporate bonds, which held up better than the corporate market overall
and added extra yield
Economic Outlook:
Tilt Toward Disinflation To Be Bulli.titb For High Grade Bonds
Over the past few years PIMCO's Secular Outlook has described the tension between disinflation
and reflation. The forces of disinflation will be stronger over the next several years, which will
foster an environment of low and even declining global interest rates. A global free trade-based
economy with a surfoit of cheap Asian labor, along with waning fiscal and monetary stimulus,
will suppress jnflation. U.S. inflation is not likely to exceed 3 percent even if already Jow interest
rates fall further. The same applies for Euroland and Japan, with the potential for 1 ~2 percent
Consumer Price Index (CPI) throughout much of the global economy over the next five years.
This environment will be favorable for high quality bonds. A range of 3-4~~ percent for the yield
on ten·year Treasuries should prevail over the next several years. Yields on Euroland bonds will
be slightly lower due lo the region·s structural economic problems, disinflationary incorporation
of new Central and Eastern European entrants and growth-inhibiting demographics. Important
aspects of our secular outlook arc:
• Brettoo Woods II Has Life -Under the so-called Brelton Woods U arrangemem. Asian
central banks invest their savings in Treasuries to prevent Lheir currencies from appreciating
R!lative to the U.S. dollar, thereby helping finance the U.S. trade deficit. While a substantial
Chinese currency revaluation or an erosion of U.S. consumer confidence could undermine BW
Tl, mutual self-interest should sustain this de facto monetary union for the time being. It
provides Asian producers with cheap, export-stimulating currencies. U.S. consumers,
meanwhile. obtain low cost imports and enjoy interest rates perhaps J 00 basis points lower
than would otherwise be the case.
• The "Pump,. Is Near Its Limit -Over the past five years falling real interest rates associated
with BW 11 and the Federal Reserve's accommodative monetary policy have pumped up
valuations of risky assets. These gains stand in contrast to prior periods when asset price
appreciation was generated by surging productivity or advances in technology. The effect of
the Pump bas been to create wealth that has sustained U.S. consumption and kept the global
economy going. The Pump is best exemplified by the yield on S-year TIPS, which has fallen
from 4 percent five years ago to 1 percent today. lf3 percent inflation is alJ the U.S. has gotten
from the Pump. it seems unlikely that we will get more inflation even if real yields fall further.
• Low Returns From Riskier Assets -Price inflation in real estate, stocks. corporate bonds
and other riskier assets can only be pumped a little further by monetary policy and BW II
given already low yield level~. PIMCO is not forecasting a collapse in home values or the
stock market but we believe that we are surely heading down the home stretch of the U.S.
race to prosperity based on asset price appreciation.
• IA?veraged Inveslments Pose Systemic Risk -Abundant liquidity in financial markets
associated with the Pump has allowed for increased leverage and also quicker exits from
investment strategies. Leverage throughout the global financial system will pose a danger to
risk~riented markets such as stocks~ high yield bonds, complex debt structures such as
collaterali~..ed debt obligations (CDOs) and real estate as owners realize that their returns can
no longer be pumped up anywhere near double-digit expectations. An unwinding of leveraged
structures, which could occur even amid economic gro\.\'th, would roil financial markets and
shake confidence.
• Geopolitical Risks --Flash points around the world include North Korea, Taiwan and Iran. An
eruption in any of these areas, while impossible to forecast, could undennine the economic
stability provided by BW II.
Prudently Exploit Benefits of Disinflation and BW II Stability
• Duration -We will maintain tactical flexibility in a low interest rdte world. When rates are
near the high end of our forecasted rangel> we will extend duration moderately above the
benchmark to capture the benefits of continued disinflation. As rates fall to the lower end of
the range, our duration targets will be shortened.
• Yield Curve: TIPS, Munis and Europe -High quality, longer maturity bonds will be
attractive in a disinflationary environment. While maintaining a neutral yield curve posture
overall, we wilJ continue to take selective longer maturity exposure in TIPS, municipal bonds
and, where aUowed, in currency-hedged European government bonds. While P1MCO has
trimmed TIPS positions recently amid strength in this market. longer maturity TJPS should
continue to benefit from low and stable real yields. ~oreover. the asset class still provides
relatively cheap protection against inflation. Longer maturity municipal bonds offer value a<i
the municipal )'icld curve remains steeper than taxable bond curves. Longer dated Eurozone
bonds should be compelling because disinflationary forces are likely to be t.-specialJy
pronounced in European economies.
• Emphasize Mortgage Security Selection -Mongage ... backcd bonds will remain an imponant
structural holding because of their high credit quality and yield advantage versus Treasuries.
Given full valuations in this sector. PIMCO will add value via coupon and security selection.
• Corporate Str.1tcgy -· Corporate credit premiums overall remain near historic lows~ and
disinflation will not be friendly to corporate revenues. PIMCO will continue to underweight
this sector. though we may opportunistically add to our holdings if credit premiums widen for
select issues.
• Emerging Markets: China is not the only emerging economy to reap gains from the stahiliry
offered by BW II. Strong commodity markets and robust import demand from the U.S. have
resulted in favorable tnldc balances and substantial currency reserve accumulation in many
emerging nations. Moreover, emerging market bonds generally offer higher yield premiums
than comparably rated corporate credits. PJMCO will look to add opportunistically to holdings
<.1f higher quality emerging market bonds.
• Modest Currency Exposure -Currencies most likely to gain versus the dollar over the next
several years include the yen and select emerging market currencies. Trade surpluses \'Crsus
the U.S. and a modest revaluation by China could generate upward pressure on these
currencies.
S'trategr:
The following list highlights the strategies that will be used in the Long Tenn portfolio in the
coming months:
• Prudently exploit benefits of disinflation and RW 1J stability
• Extend duration modestly above the index when rates are near the higher end of our forecasted
range~ shorten duration targets as rates near the low end
• Utilize broader-than-index yield curve exposure to benefit from value across aJI maturities
• Hold TIPS as these are expected to benefit from low and stable real yields and offer relati\'ely
cheap protection against inflation
• Add value in the mortgage sector via coupon and security selection given full mortgage
valuations
• Underweight corporate bonds. where credit spreads remain thin; look to trim this underweight
if select issues cheapen
The following list highlights the strategics that will be used in the Liquid portfolio in the coming
months.
• Prudently exploit bendits of disinflation and BW 11 stability
• Extend portfolio duration modestly when rates are near the higher end of our forccasted range;
tactically adjust duration lower when rates are at the low end of our forecasted range
• Hold select corporates to enhance portfolio yield look to add undervalued issues in die sector
We look forward to discussing these and other topics with you in the near future.
Best regards.
Christine Telish. CF A
Vice President
John M. Miller, CF A
Senior Vice President
OCSD Investment Management Program
Quarter End Portfolio Values
(Marked-to-Market)
$450,000,000-.-----------------------------------------------------.
$300,000,000 -----
$200,000,000 -------
$50,000,000 --
31 Mar04 30 Jun 04 30 Sep 04 31Dec04 31 Mar05 30 Jun 05
CJ Liquid Operating Monies C Long-Term Operating Monies
._,
Summary of Performance Data and Portfolio Statistics
Orange County Sanitation District
Liquid Operating Portfolio
Performance
Periods Ended 6/3012005
Total Portfollo1 -Before Fees (%) 4.21
After Fees (%) 4.06
Citigroup 3 Month T ·BUI Index (%)2 3. 78
2.91
2.76
2.49
Summary Information 3/31/2005 6130/2005
Total MarketVafue ($MM) 73.5 39.1
Quarterly Contributions ($MM) 0.0 -35.0
Estimated Annual Income (SMM) 2.1 1.2
Estimated Ylefd to Maturity (%) 2.9 3.1
Estimated Duration (yrs) 0.1 0.2
Average Maturity (yrs) 0.1 0.2
Average Quality AAA AAA
Average Coupon(%) 2.2 2.3
Net Currency Exposure (%) 0.0 0.0
Tracking Error (3 yrs, %)4 • 0.1 0.1
lnfonnation Ratio (3 yrs)4 • 1.4 1.0
* See example of tracking error I information ratio on
footnote page of the Appendix.
See footnotes In Appendix.
• 1.62
1.48
1.47
2.15
1.98
2.04
-1.79
1.66
1.71
Sector Allocation
Govemment
Mortgages
Corporates
High Yield
1.35 0.72
1.27 0.68
1.26 0.69
Non U.S.$ Developed Issues
Emerging Markets Issues
Other
Net Cash/Money Markets:3
Commercial Paper I STIF
ST Government
Certificate of Deposit
Banker's Acceptance
Money Mkt Futures
Less: Llabllltles
Total
5-Year Return vs. Standard Deviation
12 I' ······· ...... -··-··
10
'ii --e 5 0:: 6 ! Ml 1·3 Yr. ~ 4 .A Treasury
~ II I Portfollo
2 . Index
01..... . ....... ·'·
0 2 4 6
x
Citigroup
10-Yr. Strip
8 10
Standard Deviation of Retum2 (%)
% of Market Value * Duration In Yrs •
itilt4.z.g 6/30/2005 3131/2005 '''·iH·ie+ 31 28 0.0 o.o
0 0 0.0 o.o
9 9 0.0 0.0
0 0 0.0 0.0
0 0 0.0 o.o
0 0 0.0 0.0
0 0 0.0 0.0
60 63 0.1 0.1
46 63 0.1 0.1
0 0 0.0 0.0
3 0 0.0 0.0
0 0 0.0 0.0
0 0 0.0 o.o
11 0 0.0 o.o
100 100 0.1 0.2
• March 31, 2005 data has been restated to reflect credit default swaps at
bond-equivalent value.
Summary of Performance Data and Portfolio Statistics
Orange County Sanitation District
Long Term Portfolio
Performance
Periods Ended 6/30/2005
Total Portfolio1
Before Fees (%)
After Fees (%)
Merrill 1-5 Year Gov't.Corp. (%)2
-5.90
5.74
5.76
• 5.58 3.86
5.42 3.71
5.72 3.64
Summary Information E!Str~·l·~illMH•l·~i
Total Market Value ($MM)
Quarter1y Contributions ($MM)
Estimated Annual Income ($MM)
Estimated Yleld to Maturity(%)
Estimated Duration (yrs)
Benchmark Duration (yrs)
Average Maturity (yrs)
Average Quality
Average Coupon (%)
Net Currency Exposure(%)
Tracking Error (3 yrs., %)3 •
Information Ratio (3 yrs.)3 •
336.9
-30.0
12.2
4.1
2.0
2.4
2.2
AAA
3.6
0.0
0.5
0.3
342.8
0.0
13.1
4.1
2.3
2.4
2.6
AAA
3.9
0.0
0.5
0.4
• See example of tracking error I information ratio on
footnote page of the Appendix.
See footnotes In Appendix.
--3.36 1.77 1.45 1.75
3.21 1.66 1.37 1.72
2.89 1.17 1.02 1.67
8
~ 6 ! ~ ' Qj a:
'5l 4 :
.I:! ;
;;; i
::J
2 I c c <:
;
o I
0
S·Yeor Return vs. Standard Deviation
Portfolio r# Index
.a. Citigroup 3·
Mo
X LBAG
2 4 6 8
Standard Deviation of Rctum1 (%)
% of Market Value • % of Duration•
Sector Allocatlon BltM•l·~tlll•?C~N·~iltiltrM•llEIMH•l•~-1
Government
Mortgages
Corporates
High Yleld
Non U.S. $ Developed Issues
Emerging Markets Issues
Other
Net Cash Equivalents:3
Commercial Paper I STIF
ST Mortgages
ST Corporates
ST Government
Other
Less: Liabilities
Total
71
19
1
0
0
0
0
9
0
11
-5
100
78 65
18 31
2
0 0
0 0
0 0
0 0
3 2
0 0
1 0
16 2
6 0
1 0
-21 0
100 100
•March 31 , 2005 data has been restated to reflect credit default swaps at
bond-equivalent value.
77
17
2
0
0
0
0
4
0
0
2
2
0
0
100
Balance
June 1, 2005
Deposits:
6/30/2005
Total Deposits
Withdrawals:
6/2/2005
6/8/2005
6/17/2005
6/22/2005
6/23/2005
Orange County Sanitation District
Investment Transactions and Balances in the
State of California Local Agency Investment Fund
June 30, 2005
Par Value Book Value Market Value
$26,032,936 $26,032,936 $26,032,936
25,800,000 25,800,000 25,800,000
25,800,000 25,800,000 25,800,000
(6,300,000) (6.300,000) {6,300.000)
(2,600.000) (2,600.000) {2.600,000)
(4.900,000) (4.900,000) (4 ,900,000)
(2,000.000) (2.000,000) (2,000.000)
(5,700.000) (5, 700.000) (5.700,000)
Total Withdrawels (21 ,500.000) (21.500.000} (21.500.000)
Balance
June 30, 2005 $30,332,936 $30,332,936 $30,332,936
Rate Yield
2.97 2.97
2.97 2.97
2.97 2.97
2.97 2.97
2.97 2.97
2.97 2.97
2.97 2.97
2.97 2.97
2.97 2.97
2.97 2.97
LIQUID OPE~·PIMCO -OCSF07511102
Description
CASH & CASH EQUIVALENTS
U.S. DOLLAR
INTEREST
COMMERCIAL PAPER -DISCOUNT
FED HM LOAN BNK -LESS THAN 1 YR
FEDERAL HOME LOAN MORTGAGE -LESS THAN 1
FNMA ISSUES -LESS THAN 1 YR
MUTUAL FUNDS
TREASURY BILLS -LESS THAN lYR
FIXED INCOME SECURITIES
U.S. DOLLAR
BANKING & FINANCE
U.S. DOLLAR
CASH & CASH EQUIVALENTS
TOTAL ASSETS -BASE:
Asset Summary
by Asset Type with Sectors
~/30/2005
Cost
Shares Par Base
209,877.01
2,800,000.000 2,778,595.00
6, 100,000.000 6,062,253.42
4,000,000.000 3,956,401.13
10, 700,000.000 10,577,387.77
1, 110,656.310 1,110,656.31
11,000,000.000 10,875,701.36
35,710,656.310 35,570,872.00
35,710,656.310 35,570,872.00
3,500,000.000 3,499,940.20
Report ID: GL8251
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
Market Value
Base
%of
Total
Net Unrealized
Gain/Loss
Base -------·····-·············-·····
209,877.01 0.54% 0.00
2, 778,595.00 7.11% 0.00
6,062,253.42 15.52% 0.00
3,956,401.13 10.13% 0.00
10,577,387.77 27.07% 0.00
1,110,656.31 2.84% 0.00
10,875,701.36 27.84% 0.00
35,570,872.00 91.04% 0.00
35,570,872.00 91.04% 0.00
3,500,000.00 8.96% 59.80
39,210,656.310 ____ 3_9....;;,_o_70_,;_s_1_2_.2_0 ____ a_9....;,,0_1_0-=''-s_7_2._o_o 59.80
1 Workbench
I LONG TERM OPER-PIMCO -OCSF07522202
Description
CASH & CASH EQUIVALENTS
U.S. DOLLAR
PENDING TRADES
INTEREST
CERTIFICATES OF DEPOSIT • DOMESTIC
MUTUAL FUNDS
U.S. DOLLAR
CASH & CASH EQUIVALENTS
FIXED INCOME SECURITIES
U.S. DOLLAR
ABS -AIRPLANE RECEIVABLES
ABS • HOME EQUITY
BANKING & FINANCE
COLLATERALIZED MORTGAGE OBLIGATION
FHLMC MULTICLASS
FHLMC POOLS
FNMA POOLS
GNMA MULTI FAMILY POOLS
GNMA SINGLE FAMILY POOLS
INDUSTRIAL
INFLATION INDEXED SECURITIES
PVT PLACEMENTS -MORE THN 1 YR
U.S. AGENCIES
U.S. GOVERNMENTS
UTILITY -ELECTRIC
U.S. DOLLAR
FIXED INCOME SECURITIES
TOTAL ASSETS -BASE:
Asset Summary
by Asset Type with Sectors
6/30/2005
Cost
Shares Par Base
-72,891,745.10
3,475,883.41
10,000,000.000 9,995,500.00
1,486, 739.460 1,486,739.46
11,486,739.460 -57 ,933,622.23
11,486,739.460 -57 ,933,622.23
1,600,000.000 1,600,000.00
443,416.800 443,416.80
44, 150,000.000 44,241,571.00
1,625,857.810 1,625,857.81
730,909.940 731,688.60
50,760.810 49,523.51
56, 788, 776.080 57,497,631.85
3,015,840. 960 3,006, 148.54
512,217.650 537,054.43
2,000,000.000 1,998, 188.00
25,594,309.860 26,140,659.55
752,000.000 826,199.84
18,513,599.870 18,317,891. 77
240,194,342.070 242,606,383.27
3,150,000.000 3, 143,840.00
399, 122,031.850 402,766,054.97
399, 122,031.850 402, 766,054. 97
410,608,771.310 344,832,432. 74
1
Report ID: GL8251
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
St11.tus.: .:fINAL ..
Market Value
Base
-72,891,745.10
3,475,883.41
9,995,500.00
1,486,739.46
-57 ,933,622.23
-57 ,933,622.23
470,000.00
443,824.74
44,239,276.14
1,723,490.57
731,523.90
52,370.94
57,471,959.21
3,054,378.87
535,675.21
1,999,680.00
27, 113,549.88
826,199.84
18,545, 167.53
240,331,892.20
3,171,913.50
400,710,902.53
400, 710, 902.53
342, 777 ,280.30
% of
Total
-21.27%
1.01%
2.92%
0.43%
-16.90%
-16.90%
0.14%
0.13%
12.91%
0.50%
0.21%
0.02%
16.77%
0.89%
0.16%
0.58%
7.91%
0.24%
5.41%
70.11%
0.93%
116.90%
116.90%
100.00%
Net Unrealized
Gain/Loss
Base
0.00
0.00
0.00
0.00
0.00
0.00
-1,130,000.00
407.94
-2,294.86
97,632.76
-164.70
2,847.43
-25,672.64
48,230.33
-1,379.22
1,492.00
972,890.33
0.00
227,275.76
-2,274,491.07
28,073.50
-2,055, 152.44
-2,055, 152.44
-2,055,152.44
Workbench
\ ,• FAHR COMMITTEE Meeting Date
09/14/05
AGENDA REPORT Item Number
FAHR05-78
Orange County Sanitation District
FROM: Robert P. Ghirelli, D. Env., Director of Technical Services
Originator: Mahin Talebi, Source Control Manager
To Bd. of Dir.
09/28/05
Item Number
14(a)
SUBJECT: RESPONSE TO NEWPORT FAB, LLC'S (DOING BUSINESS AS JAZZ
SEMICONDUCTOR) REQUEST, QUESTIONING THE APPLICABILITY
OF THE SUPPLEMENTAL CAPITAL FACILITIES CAPACITY CHARGE
GENERAL MANAGER'S RECOMMENDATION
FAHR Committee Recommendation:
(1) Receive and file letter from Newport Fab, LLC dated November 29, 2004,
requesting a transfer of the flow baseline established by Conexant; and,
(2) Deny request to transfer the flow baseline previously established by Conexant to
Newport Fab, LLC.
Staff's Recommendation to FAHR Committee:
(1) Authorize the General Manager to transfer to Newport Fab, LLC, the flow baseline
as defined by Ordinance No. OCSD-26 previously established at the same discharge
location by a company known as Conexant; and, (2) to initiate the process to amend
Ordinance No. OCSD-26 to clarify the policy for transferring baselines from an Existing
User to a New User.
SUMMARY
A. Policy
In an effort to ensure that every property owner paid its fair share for capital facilities
(e.g. pipes, pumps, and structures) that were built to treat the waste generated by each
parcel, it was necessary to adopt an ordinance that set charges for all dischargers:
domestic, commercial, and industrial. In addition to the capital charges, a supplemental
charge was applied to those commercial and industrial users permitted by the District
that had significant industrial loadings of flow, biochemical oxygen demand and
suspended solids. In the circumstances further described in this document, flow is the
only issue.
Effective on January 1, 2000, the District adopted an ordinance requiring Significant
Commercial-Industrial Users (SCIU) to pay annually a Supplemental Capital Facilities
Capacity Charge (SCFCC) if their loadings exceeded a baseline established for each
permitted company. To establish a baseline, the existing companies which were
connected and discharging prior to January 1, 2000, were grandfathered in and allowed
a baseline established upon the loadings discharged for fiscal year 1998-99. For those
C:\Oocuments and Settingslkawaillocal Settlngs\Temporary 1n1emet F11es\OLK7211tem 14(g) Newport Fab.doc
AeV1sed. 06/04/03 Page 1
existing companies that had flows which were less than 25,000 gallons per day, a
minimum baseline flow was set at 25,000 gallons per day. The flow baseline for
companies which obtained a discharge permit after January 1, 2000, is also set at
25 ,000 gallons per day.
B. Facility Background and Request
In February 2002, Conexant, which is located in Newport Beach, submitted a
wastewater discharge permit application for approval to continue to discharge to the
sewer system under the name, Newport Fab, LLC. The application was presented to
the District as if Newport Fab would be an entirely new company under different
ownership. The District, believing Newport Fab to be a new company then issued on
March 8, 2002 a new discharge permit to Newport Fab, LLC with the baseline flow of
25,000 gallons per day, in accordance with the policy previously summarized. This
action had the result of increasing Newport Fab, LLC's financial obligation to pay a
significantly higher SCFCC to the District.
Subsequently, it was revealed to the District that Conexant retained 38% ownership of
the fabrication facility and the Carlyle Group (51 %) and RF Micro Devices (11 %) own
the remaining percentage. Conexant also maintains 100% ownership of the 25-acre
parcel, the sewer connection, and the two buildings currently occupied by Newport Fab.
Newport Fab believes that the baseline of 1.7876 million gallons per day previously
established by Conexant should be retained by Newport Fab and requested the District
reestablish the previous baseline and revise the SCFCC applied to Newport Fab on the
basis of: 1) the transaction did not result in the creation of new facilities or the
expansion of th e existing facilities, and 2) the Newport Fab manufacturing operation is
identical in terms of wastewater discharge quantity and quality as it was under the name
Conexant.
C. Financial Impact
The table below shows the estimated financial impact of not granting the Conexant
baseline to Newport Fab as a New User vs. allowing the previously established baseline
as an Existing User.
Fiscal Years
2001 -02 (partial)
2002-03
2003-04
2004-05
2005-06
2006-07
W/O Baseline
$54,971
$215,724
$242,531
$432,569
$450,114
$471 ,614
STAFF RECOMMENDATION
With Baseline
$21 , 161
$77,472
$102,023
$185,816
$203,361
$224,861
Difference
$33,809
$138,252
$140,509
$246,753
$246,753
$246,753
The District's Ordinance No. OCSD-26 does not contain specific guidance as to what
corporate organizational changes transform an Existing User into a New User and,
therefore, subject to the New User Baseline. Staff's recommendation to the FAHR
Committee supported granting the existing baseline to Newport Fab, LLC, based on:
C:IDocuments and Seningslkawai\Local Set11ngs\Temporary lntemet Files\OLK72Utem 14(g) Newpon Feb.doc
Revised: 06/04/03 Page 2
f '·
1) Although Newport Fab is an independent corporation, Conexant as a partner still
owns 38% of the manufacturing operation. Conexant also maintains the entire
ownership of the two buildings currenUy occupied by Newport Fab and the sewer
connection which was connected and discharging to the sewer system prior to
January 1, 2000.
2) Newport Fab has not changed or increased the manufacturing processes and
therefore, no additional impact has been imposed on the District's sewer facilitates.
Moreover, the complex corporate changes that Conexant/Jazz
Semiconductor/Newport Fab underwent appear to be a novel situation that was not
contemplated when the SCFCC was adopted.
The FAHR Committee listened to the presentation by staff, reviewed the information in
the staff report, and after a lengthy discussion recommended that the request by
Newport Fab LLC be denied based upon:
1) Jazz applied for a new permit under new ownership and the ordinance does not
allow transferability to a new company.
2) Conexant retained less than 51% ownership, thus Jazz is a new user.
Staff will work on an amendment to the ordinance to clarify the ownership question in
accordance with direction provided by the FAHR committee and will bring that back to
the board at a future date.
PRIOR COMMITTEE/BOARD ACTIONS
Ordinance No. OCSD-26 Adoption.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT D This item has been budgeted. (Line item: ) D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
~ Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
None.
C:\Documents and Settings\kawai\Local Settings\Temporary Internet Files\OLK72\ltem 14(g) Newport Fab.doc
Revised: 06/04/03 Page3
GWR System Steering Committee
August 8, 2005
MINUTES
GROUNDWATER REPLENISHMENT SYSTEM STEERING COMMITTEE
STEERING COMMITTEE
(A Committee of Orange County Water District
and Orange County Sanitation District Directors)
OCWD Boardroom, 10500 Ellis Avenue, Fountain Valley
Monday, August 8, 2005, 5:30 p.m.
Committee Members
Philip L. Anthony
Kathryn Barr
Roger Yoh
Steve Anderson
Mike Duvall
Carolyn Cavecche
Alternates
Jan Debay
Denis Bilodeau
Steve Sheldon
Jim Ferryman
Don Bankhead
Larry Crandall
Other Directors Present
OCWD Director, Chairman ....... Not Present
OCWD Director .............................. Present
OCWD Director ............................... Present
OCSD Director ............................... Present
OCSD Director, Vice Chairman ......• Present
OCSD Director ............................... Present
OCWD Director (No. 1) ................... Present
OCWD Director {No. 2) Not Present
OCWD Director (No. 3) ............ Not Present
OCSD Director {No. 1) ............. Not Present
OCSD Director {No. 2) .................... Present
OCSD Director (No. 3) ............•....... Present
Wes Bannister, OCWD Director
~~ ~·-~ ~('" ('~ ~~ ~ "11> '°r. ").. ob. ~/
CONSENT CALENDAR (ITEM NO. 1-2 ) MOTIONNOTE ACTION TAKEN
1. MINUTES OF PREVIOUS MEETING BARR-SECOND, AYE
RECOMMENDATION: Approve Minutes of the July 11, 2005 YOH-AYE APPROVED DEBAY-AYE Groundwater Replenishment System ANDERSON -AYE Steering Committee Meeting as mailed DUVALL-AYE
CAVECCHE -MOTION, AYE
2. CHANGE ORDER NO. 1 TO THE TASK ORDER WITH BARR-SECOND, AYE
HELLMUTH, OBATA + KASSABAUM (HOK), INC. FOR YOH-AYE APPROVED ADDITIONAL DESIGN SERVICES FOR THE WAREHOUSE DEBAY-AYE
RECOMMENDATION: Agendize for the August 17 OCWD Board ANDERSON -AYE
DUVALL-AYE meeting: Authorize issuance of Change CAVECCHE -MOTION, AYE Order No. 1 to the Hellmuth, Obata +
Kassabaum (HOK). Inc. Task Order in the
amount of $7 1400 for additional design
services required for the warehouse
addition
END OF CONSENT
-1 -
MATTERS FOR CONSIDERATION
3. CONTRACT NO. GWRS-2003-2 -GROUNDWATER
REPLENISHMENT SYSTEM UNIT Ill PIPELINE PROJECT
(KEN THOMPSON, INC.): NOTICE OF COMPLETION
RECOMMENDATION: Agendize for the August 17 OCWD Board
meeting: Accept completion of work and
authorize filing of Notice of Completion
4. INSPECTION SERVICES FOR THE GWR SYSTEM
ADVANCED WATER PURIFICATION FACILITY
RECOMMENDATION: Authorize advertising for and hiring of a two-
year limited term electrical inspector for the
GWR System Advanced Water Purification
Facility at an hourly rate not to exceed $65
per hour with the costs being shared
between the two agencies
INFORMATIONAL ITEMS
5. ADVANCED WATER PURIFICAITON FACILITY COST
SAVINGS UPDATE
6. PROJECT SCHEDULE AND BUDGET UPDATE
7. CONSTRUCTION PROJECTS PROGRESS
8. MONTHLY CHANGE ORDER UPDATE
9. STATUS REPORT
• Grants and Loans Update
• Public Information and Education Update
DIRECTORS' ANNOUNCEMENTS/REPORTS
GENERAL MANAGERS' ANNOUNCEMENTS/ REPORTS
ADJOURNMENT
-2-
GWR System Steering Committee
AugustB,2005
BARR-SECOND, AYE APPROVED
YOH-MOTION, AYE DIRECTOR DUVALL DEBAY-AYE SAID THAT THE ANDERSON -AYE BUDGETED SAVINGS DUVALL-AYE
CAVECCHE -Ave SHOULD NOT BE PUT
INTO A "PROGRAM
CONTINGENCY', BUT
SHOULD REMAIN IN
THIS PROJECT'S
BUDGET LINE ITEM.
STAFF AGREED.
BARR -SECOND, AYE APPROVED
YOH-AYE MR. MARKUS DEBAY-AYE
ANDERSON -MOTION, AYE SUGGESTED THAT IF
DUVALL-AYE A SUITABLE
CAVECCHE -AYE CANDIDATE COULD
NOT BE FOUND IN 2-3
MONTHS, THAT
STAFF WOULD ASK
MWH IF THEY
COULD PROVIDE THIS
POSITION.
INFORMATIONAL
INFORMATIONAL
INFORMATIONAL
INFORMATIONAL
INFORMATIONAL
DIRECTOR DUVALL
SUGGESTED THAT A
GOOD MEANS OF
OUTREACH FOR THE
PROJECT WOULD BE
TO HAVE A BOOTH AT
NEXT YEARS OC
FAIR.
6:35 P.M.
BOARD OF DIRECTORS
AGENDA REPORT
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: David May, Project Manager
Meeting Date
Item Number
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION -PIPE PROCURMENT,
JOB NO. l-2-4P
GENERAL MANAGER'S RECOMMENDATION
To Bd. of Dir.
09/28/05
Item Number
16
(1) Approve Plans and Specifications for Bushard Trunk Sewer Rehabilitation Pipe
Procurement, Job No. l-2-4P, on file at the office of the Board Secretary; (2) Approve Addenda
Nos. 1 and 2 to the plans and specifications; (3) Receive and File Bid Tabulation and
Recommendation; and (4) Award a Purchase Contract to Ameron International for Bushard
Trunk Sewer Rehabilitation Pipe Procurement, Job No. l-2-4P, for an amount not to exceed
$7,699,777.30.
SUMMARY
• The project is located within the Cities of Huntington Beach and Fountain Valley. The trunk
sewer is on Bushard Avenue between Ellis Avenue and Banning Road, Banning Road
between Bushard Avenue and Brookhurst, and Brookhurst between Banning Road and
Plant No. 2. The project consists of four miles of 108-inch sewer pipe.
• After construction began in November, 2002 problems occurred with the pipe being supplied
for the project and continued; the bells of th e concrete pipe joints cracked. Staff determined
the cause of the problems to be with the pipe fabrication and installation. This was disputed
by the Contractor and Pipe Fabricator. The Sanitation District, the Contractor and Pipe
Fabricator have settled this dispute by agreement.
• As part of the settlement agreement, the Sanitation District agreed to purchase and supply
pipe for the remainder of the project. Bids were taken for the pipe and authorization to
award the pipe supply contract is now requested.
• Summary information on the Job No. l-2-4P pipe procurement bids is as follows:
Engineer's Estimate:
Low Responsive Bid:
High Bid:
Number of Bids:
$ 12,000,000.00
$ 7,699,777.30
$14,824,140.00
2
• Staff contacted Hydro Conduit, whose bid was $14,824, 140 to ask why the bid price was
approximately double the bid provided by Ameren. Hydro Conduit declined to reply.
Additionally, Boyle Engineering Corp. was requested to provide an explanation for the
difference between the engineer's estimate and the low responsive bid price received. The
main reasons for the difference are:
Page 1
• The engineer's estimate was based on pricing seen in the Headworks Improvements at
Plant No. 2, Job No. P2-66 project. Prices bid for that project ranged from $680 to $850 per
linear foot of 108-inch pipe. The engineer estimated $780 per linear foot of pipe for this
project, which is within the range of the previously bid prices. The estimate used was
approximately in the middle of the reference price range. The low end of the range was not
used due to recent volatility in steel, concrete, and power/fuel prices. The high end of the
range was not used due to the quantity of pipe being purchased. The actual price bid by
Ameron International was $546.30 per linear foot. For the total quantity of pipe bid, this
resulted in an overestimate by the engineer of $3.2 million.
• The engineer estimated $100,000 per month for pipe storage costs, and the low bid for this
item was $5, 150 per month. This cost item is rarely requested and there is no historical
information available from which to estimate from. Additionally, this cost item is very specific
to each vendor's site and capabilities for storage. The resulting $1.2 million dollar difference
between the estimate and the bid probably could not have been improved upon.
• Per the settlement agreement and release the Sanitation District will recover the cost of
originally bid pipe that was to have been supplied by Steve P. Rados, Inc. As new pipe
purchased directly by the Sanitation District is delivered and installed, a credit will be given
by Steve P. Rados, Inc. Each progress payment will therefore contain a credit for the total
linear feet of pipe installed during the payment period times the cost bid by Steve P. Rados,
Inc. originally. The Sanitation District will recover costs incrementally as new pipe is
delivered and installed until the project completes. In addition, the Sanitation District has
reserved the right to recover costs associated with the procurement of the pipe that exceed
the costs that would have been paid under the original contract with Steve P. Rados, Inc.
• The Director of Engineering recommends award of the purchase contract to Ameron
International for an amount not to exceed $7,699,777.30.
PRIOR COMMITTEE/BOARD ACTIONS
A Professional Services Agreement (PSA) was approved with Boyle Engineering Corporation on
April 26, 2000; eight amendments to this contract have been authorized. A construction contract
was awarded to Steve P. Rados, Inc. by the Board of Directors on June 26, 2002 and 16
change orders to the contract have been ratified.
A Settlement and Release Agreement was executed by all parties, including the Sanitation
District, and effective as of August 1, 2005. The agreement stipulated that the Sanitation
District would purchase and supply remaining pipe to by Steve P. Rados, Inc. for installation.
PROJECT/CONTRACT COST SUMMARY
Authorization of $7,699,777.30 for the purchase contract is being requested. This authorization
is within the project construction phase budget. Additional authorization of budget for the
increased cost of piping is anticipated to be needed in the future. Please refer to the attached
Budget Information Table for more information.
BUDGET IMPACT
[8] This item has been budgeted. (Line item: Section 8, 2005-06 Budget Book, Page 47) D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
Page 2
, -
I ~. The cost of piping materials for this project has increased. Originally, Steve P. Rados purchased
pipe materials in 2003 as part of their construction contract. Per the recently approved
settlement agreement and release between the Sanitation District, Steve P. Rados and Rinker
Materials dba Hydro Circuit, the Sanitation District will purchase remaining pipe materials.
Approximately 13,600 feet of 108-inch diameter pipe and 200 feet of 96-inch diameter pipe will
be purchased. The cost of these materials in 2005 is greater than in 2003. Pipe procurement
bids were received on August 25, 2005 and the low bid was $7,699,777.30. Staff will need to
request additional budget for the material cost increase in a future Board action.
As described above, the Sanitation District will incrementally recover the cost of pipe originally
bid. The incremental cost recovery will lag the cost outlay for new pipe fabricated and delivered
as part of this contract. This may require Staff to request additional budget to cover the
temporary short fall of funds.
ADDITIONAL INFORMATION
The Contractor and the pipe fabricator submitted claims totaling several million dollars for extra
costs associated with the pipe problems. The Sanitation District counterclaimed against the
Contractor and rejected the approximately 5,000 feet of pipe that had been manufactured. The
Staff, the Contractor, and the Pipe Fabricator mediated these claims on March 23, 2005. The
Board authorized staff and legal counsel to enter into a settlement agreement with the
Contractor and Pipe Fabricator based upon the mediation. The settlement agreement was
finalized August 1, 2005.
The terms of this settlement agreement were previously discussed with the Board. The
settlement agreement will allow the Sanitation District to continue and complete the project.
ALTERNATIVES
None.
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program EIR certified on October 27, 1999.
A Notice of Determination was filed on October 29, 1999. The project was included in
Addendum No. 3 to the Program EIR approved on December 19, 2001. The addendum did not
change the CEQA findings.
ATTACHMENTS
1. Budget Information Table
2. Bid Tabulation
DL:DM:kf
H:\ntglobal\Agenda Draft Reports\Joint Boards\l-2-4P Agenda Report PipeProcurement Award (2).doc
Page3
PROJECT/PHASE
Phase 1 -Project Development
Phase 2 -Preliminary Design
Phase 3 -Design
Phase 4 -Construction
Phase 5 -Commissioning
Phase 6 -Close-Out
Phase 7 -Contingency
PROJECT TOTAL
!Reimbursable Costs
PROJECT NET
Design PSA
Construction Contract
EDMS: 003796401
ORIGINAL CURRENT
AUTHORIZED PROJECT
BUDGET BUDGET
$ 74,000 $ 74,000
$ 10,000 $ 10,000
$ 2,168,000 $ 2,168,000
$ 48,142,000 $ 48,142,000
$ 416,000 $ 416,000
$ 72,000 $ 72,000
$ 2,698,000 $ 2,698,000
$ 53,580,000 $ 53,580,000
BUDGET INFORMATION TABLE
BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4P
PROPOSED PROPOSED FUNDS . THIS BUDGET REVISED AUTHORIZED TO AUTHORIZATION INCREASE
/DECREASE . BUDGET DATE REQUEST
$ 74,000 $ 74,000
$ 10,000 $ 10,000 $ -
$ 2,168,000 $ 2,168,000
$ 7,699,777 $ 55,841,777 $ 37,124,905 $ 7,699.777
$ 416,000 $ 326,000
$ 72,000 $ 40,000
$ 2,698,000 $ 2,698,000
$ 7,699,777 $ 61,279,777 $ 42,440,905 $ 7,699,777
.PROPOSED ESTIMATED
TOTAL EXPENDITURE.
AUTHORIZATION TO DATE
$ 74,000 $ 73,888
$ 10,000 $ 9,161
$ 2,168,000 $ 2,172,467
$ 44,824,682 $ 21,665,602
$ 326,000 $ 251,509
$ 40,000 $ 1,657
$ 2,698,000
$ 50,140,682 $ 24,174,284
$ 53,580,000 $ 53,580,000 $ 7,699,777 $ 61,279,777 $ 42,440,905 $ 7,699,777 $ 50,140,682 $ 24,174,284
PSA/Contract
$ 845,300 $ 2,467,825 $ -$ 2,467,825 $ 2,467,825 $ -$ 2,467,825 $ 2,166,745
$ 30,260,934 $ 32,264,139 $ . $ 32,264,139 $ 32,264,139 $ . $ 32,264,139 $ 16,247,398
,.
..
·esr1MAT'm
EXPENDED TO
• DATE(%) .•
.
100%
92%
100%
48%
77%
4%
0%
48%
48%
88%
50%
•.
I
August25,2005
11 :00 a.m.
ADDENDUM N0.:2
BID TABULATION
BUSHARD TRUNK SEWER REHABILITATION-PIPE PROCUREMENT
JOB NO. 1-2-4
Engineer's Estimate: $12,000,000 Construction Contract Budget: $48, 142,000.
CONTRACTOR TOTAL BID
1. Ameron International Water Transmission Group $ 7,699,777.30
2. Hydro Conduit Corporation $ 14,824, 140.00
3.Hobas Pipe $ Non Responsive
4. $
5. $
6. $
7. $
8. $
I have reviewed the proposals submitted for the above project and find that the low bid
is a responsible bid. I, therefore, recommend award to Ameron International Water
Transmission Group in the bid amount of $7,699,777.30 as the lowest and best bid.
David A. Ludwin, P.E.
Di rector of Engineering
DAL:DM:jo
003796469
OCSD • P.O. Box 8127 • Fountain Valley, CA 92728-8127 • (714) 962-241 1
-,
BOARD OF DIRECTORS Meeting Date To Bd. of Dir.
09/28/05
AGENDA REPORT Item Number Item Number
17
Orange County Sanitation District
FROM: Nick Arhontes, Director, Regional Assets and Services Department
SUBJECT: ACQUISITION OF PROPERTY FOR NORTH COUNTY YARD
GENERAL MANAGER'S RECOMMENDATION
(1) Approve and direct the Board Chair to execute on behalf of the District a Purchase
and Sale Agreement in a form acceptable to General Counsel to acquire the property
located at 7465 Lampson Avenue in Garden Grove for $7,900,000; and,
(2) Approve the use of the acquired property for the North County Yard.
SUMMARY
In November 2004, staff provided an initial information item regarding the need for a
north county yard facility that included a site selection process for a possible acquisition.
Since November 2004, District staff has worked with a commercial real estate
brokerage firm to refine the list of likely sites for a north county facility for collections
staff. Due to increasing industrial land prices and lack of availability in the original
Orange Crush I Platinum Triangle vicinity, staff has investigated locations west of that
and north of the Garden Grove Freeway.
District staff retained the services of an architectural firm to help evaluate and rank the
possible sites. The analysis examined a series of site selection criteria, including site
area, building area, and proximity to the center of the service area. Other site factors
considered included egress, ease of development, truck route suitability, the tenant
improvement costs that were likely to be needed, and other physical issues such as
building dock height. The preferred site identified by this evaluation, performed again
on September is the property at 7465 Lampson Avenue in Garden Grove.
The District obtained an appraisal of the property in July 2005, which indicated a market
value of $7,525,000. The owner proposed to sell for $8,300,000. Negotiations
continued with the assistance of Director Ridgeway and Terry Knapper of CB/Richard
Ellis (the broker representing the District), and the owner is now willing to sell the
property for $7,900,000.
Although negotiations concerning the terms of the sale are continuing as of the date this
Agenda Report was written, the seller has demanded that the Purchase and Sale
Agreement be executed by October 3, 2005. In order to place the District in a position
to meet that demand, Staff requests authorization from the Board to execute the
Agreement for a purchase price of $7,900,000, and otherwise in a form acceptable to
General Counsel.
Staff will also report to the Board the progress of the negotiations concerning the terms
of the sale at the time of the Board meeting. Assuming other terms of the sale can be
C:\Oocuments and Settings\kawai\local Settings\Temporary Internet Files\OLK72\ltem 17 North County Yard.doc
Revised: 06/04/03 Page 1
agreed upon, Staff recommends acquisition at the proposed price in light of the limited
and competitive marketplace for similar sites, and the suitability of the site for the north
county yard.
As a result, Staff requests that your Board authorize the Board Chair to execute an
agreement for the purchase price of $7,900,000 and otherwise in a form acceptable to
General Counsel.
Upon acquisition in an as is condition, District staff will develop and initiate a capital
project for the necessary tenant improvements following established District processes
and procedures and will thereafter commence to move to and use the property.
PRIOR COMMITTEE/BOARD ACTIONS
Staff proposed the North County Yard with Information Only Report OMTS04-57, and
provided a status update with an Information Only Report OMTS05-31 .
PROJECVCONTRACTCOSTSUMMARY
The proposed purchase price for the property is $7,900,000.
BUDGET IMPACT
~ This item has been budgeted. (Project 15-04, Budget Book Section 8 -page 44)
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
The Regional Assets and Services Department has internally discussed and developed
business needs of relocating staff directly involved with the collection systems O&M to a
more centralized location.
Sewer maintenance staff and equipment were originally based at Plant 1 in Fountain
Valley, but due to space limitations, were moved to Plant 2 in Huntington Beach in the
late 1980's. Space needs at Plant 2 for facilities growth needs and Treatment plant
support staff needs and the mounting cost of fuel and lost productivity caused by crews
having to drive their trucks to worksites in the middle of our service area now dictate
that sewer maintenance should be moved northward. The proposed site would provide
a more centralized location to conduct business. The freeway-close facility near the
"Orange Crush" 57/22/5 Freeway area was desirable to put staff closer to their work on
the small, medium and large pipe cleaning and inspection programs. Lack of availability
of desired sites moved our search to the west.
The facility should serve as a base for approximately 50 staff, their personal vehicles,
district's vehicles, service trucks, parts, supplies, tools and equipment. Space will also
be available for some Engineering and Source Control staff should their business needs
C:\Oocuments and Settings\kawa~Local Settings\Temporary Internet Flles\OLK72~tem 17 North County Yard.doc
Revised: 06/04/03 Page 2
·q
be better met by moving to a more central location. Staff will continue to use the
commercial card lock type fueling facilities countywide and not be constructing any on
site fueling facilities for District vehicles. Space will also be available to host training
events and regional meetings for joint city and sewering agency activities in this more
centralized location, and for shop and storage space. The facility will also be available
for Board use as desired.
CEQA FINDINGS
In accordance with CEQA, the District has evaluated the proposed property acquisition
and the use of the property and concluded that the project qualifies for a categorical
exemption from the California Environmental Quality Act (CEQA) pursuant to CEQA
Guidelines 15301 (Class 1 -operation, repair, maintenance, permitting, licensing, or
minor alteration of existing public or private structures, facilities, mechanical equipment,
or topographical features, involving negligible or no expansion of use). The proposed
project will utilize the existing structures at the site consistent with previously
established and permitted uses at the property, ample parking already exists for the
anticipated uses at the site, and only minor interior tenant improvements are required.
ATTACHMENTS
None
JGH:AT:sa & NJA
C:\Documents and Settings\kawai\Local Settings\Temporary lntemet Files\OLK72\llem 17 North County Yard.doc
Revised: 06/04/03 Page 3
' • BOARD OF DIRECTORS Meeting Date To Bel. of Dir .
09/28/05
AGENDA REPORT Item Number Item Number
18
Orange County Sanitation District
FROM: Blake Anderson, General Manager
SUBJECT: ESTABLISHING SUPPORT FOR GULF COAST DISASTER RECOVERY
EFFORTS
GENERAL MANAGER'S RECOMMENDATION
1. Approve Resolution No. OCSD 05-24, Establishing Support for Gulf Coast Disaster
Recovery Efforts Related to Hurricanes Emanating from the Gulf of Mexico that is
Specifically Targeted to Infrastructure Operations Pertaining to the Collection, Treatment
and Disposal of Wastewater and Associated Byproducts as requested through the Federal
Emergency Management Agency (FEMA), the Emergency Management Information System
(EMIS), or other recognized official National Coordination effort;
2. Authorize the General Manager to enter into individual "Release Time Agreements" with
volunteer employees and their recognized employee organizations (i.e., unions or employee
associations) based on the following terms:
a. A "rotation" of three employees will be released from regular duties at any given time
for up to a maximum of twelve calendar days per rotation;
b. A total of up to four "rotations";
c. Employees shall be paid for up to 80 hours of regular pay during the time th ey are
away on a twelve day rotation;
d. Up to a total of twelve employees maximum released to participate in the response
and recovery efforts for a total authorization of 960 hours (12 employees x 80 hours)
of regular paid time;
e. Cap regular paid time for volunteer employees at an authorized amount not to
exceed $75,000 for this effort; and,
3. Authorize the General Manager to deploy physical assets into the Gulf Coast area to assist
with Disaster Recovery efforts within the scope permitted herein and to support volunteer
employees based on the followin g terms:
a. One Hydro Cleaning Vactor Truck and associated equipment deployed to the Gulf
Coast region;
b. Roundtrip transportation cost to deploy the asset authorized at an amount not to
exceed $5,000;
c. Sanitation District equipment is to be operated by Sanitation District employees only;
d. Estimated equivalent cost of providing the equipment is an additional $20,000; and
4. Permit volunteer employees to engage in recovery efforts that are limited to the rendering of
specialized assistance in the areas of engineering, operations and maintenance, and/or
technical services in support of infrastructure recovery efforts pertaining to the collection,
treatment and/or disposal of wastewater and associated byproducts.
C:\Oocuments and Sett1ngs\kawai\Local Set11ngs\Temporary Internet Files\OLK72\ltem 18 Disaster Recovery Suppon.doc
AeVlsed: 06/04/03 Page 1
SUMMARY
1. The Board Chair and General Manager expressed interest in the Sanitation District
providing assistance to the Gulf Coast disaster areas related to Hurricane Katrina.
2. The United States is bracing for Hurricane Rita, upgraded to the maximum danger level of a
category five hurricane. Hurricane Rita is headed into the heart of the US oil refining area,
which arcs from Corpus Christi, Texas to already devastated New Orleans, Louisiana.
3. The mission of the OCSD is: We, the employees and the Board of Directors of the Orange
County Sanitation District, are committed to protect public health and the environment by
developing, integrating, and implementing fiscally responsible solutions to wastewater, water
reclamation and watershed protection issues. We are a values-based organization
dedicated to upholding and consistently demonstrating the attributes affirmed in our Guiding
Principles.
4. The Sanitation Districts of Los Angeles County (LACSD) received a specific request from
the EMIS through the Los Angeles Emergency Center for assistance in the New Orleans
area for site evaluation related to sewage treatment and water reclamation. The following
summarizes the LACSD experience:
a. LACSD selected two employees to respond to the request.
b. The employees selected were superintendent level with an operations
background.
c. The employees were deployed for three days.
d. There was no organizational reporting structure in-place.
e. Interaction did occur with FEMA, State and local officials without determining a
method for assistance.
f. The employees returned home without rendering aid.
g. No additional LACSD employees have been deployed.
5. The potential for OCSD involvement was reviewed by senior management, which involved
evaluation of various impacts including, but not limited to, the following:
a. Allocation of resources and benefits to OCSD
b. Volunteer activities and employer liabilities
c. OCSD operational requirements
d. Regular pay
e. Overtime pay
f. Supervision
g. Release time
h. Mental health counseling
i. Workers' Compensation
j . Tort liabilities
6. It is recommended that if OCSD supports the effort it be accomplished by entering into
"Release Time Agreements" for employees who volunteer for the effort.
7. Establishing "Release Time Agreements" will limit OCSD to the following:
a. Regular pay for up to 80 hours per employee
b. Workers' Compensation claims for injuries occurring while employees are
engaged in activities that fall within the course and scope of employment
C:\Oocuments and Settingslkawai\Local Settings\ Temporary Internet Files\OLK721ltem 18 Disaster Recovery Suppon.doc
Revised 06/04/03 Page 2
' •
c. Liabilities related to Tort Claims
d. Resulting impacts on OCSD operations
8. Risks to OCSD are:
a. OCSD will absorb the salary costs for the employees for up to 80 hours.
b. Any injury suffered by an employee during the deployment would be subject to
benefits under Workers' Compensation as this would be viewed as a work
assignment.
c. Public perception on the use of public funds.
d. Backfilling and overtime costs
9. Benefits to OCSD include on-the-job training for employees related to knowledge and skill
development for application in the event of a disaster impacting OCSD operations.
10. OCSD will send employees and assets to the Gulf Coast region only under the following
conditions:
a. There are adequately described and planned activities or objectives provided to
the Sanitation District by the coordinating authority;
b. The Sanitation district has received a specific request for the planned activities or
objectives from the coordinating authority; and,
c. The General Manager has determined that the specific employees and assets
that will be provided are appropriate for the planned activities or objectives.
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
The labor cost associated with the effort would be based on an employee's hourly pay rate up to
a maximum of 80 hours. The average fully burdened hourly rate for a Sanitation District
employee is approximately $60.00. The approximate costs for release time of twelve employees
at 960 hours based on an average fully burdened rate would be $60,000. The amount could
vary based on an employee's actual hourly pay rate.
Transportation costs associated with the deployment of a hydro cleaning vactor truck is
approximated at $5,000. The monthly rental rate for a similar piece of equipment is
approximately $8,500 per month (minimum two week rental @ $5100). Approximate costs for a
six week deployment would be $20,000.
BUDGET IMPACT
~ This item has been budgeted. (Line item: Salaries and Wages) D This item has been budgeted, but there are insufficient funds. D This item has not been budgeted. D Not applicable (information item)
ADDITIONAL INFORMATION
There are two distinct advantages to the Sanitation District to participate in this recovery effort.
First, it reinforces our willingness to meaningfully participate in National mutual aid efforts. Our
C:\Documents and Settings\kawai\Local Settings\Temporary Internet Files\OLK72\ltem 18 Disaster Recovery Support.doc
Revised: 06/04/03 Page3
willingness to provide assistance today may be very helpful when we ask for assistance
tomorrow. Second, our staff will learn firsthand what it takes to recover from a large-scale
disaster. We will incorporate our learning into our own Integrated Emergency Response Plan.
Currently, there is no Board policy supporting the Sanitation District's participation in emergency
response or relief efforts related to disasters or other emergencies at Regional, National or
International levels. The Sanitation District has a mutual aid agreement approved by the Board
of Directors that supports assistance from OCSD at the local and State levels.
The Integrated Emergency Response Plan (IERP) was originally issued December 31, 1996.
The Plan provides for OCSD response in the event of disaster (natural or manmade) and other
emergencies. The goals of the IERP are to:
• Protect human life.
• Protect the environment.
• Prevent or reduce property damage.
• Restore normal operations.
When emergencies exceed the Sanitation District's capabilities, assistance from local agencies
will be requested through prearranged agreements and working relationships. When local
resources are exhausted, assistance will be requested in accordance with the Operational Area
Agreement. This is provided for in the Mutual Aid Plan section of the IERP.
The Sanitation District has signed the Operational Area Agreement. The "Operational Area" is
defined as Orange County. In addition, since the State of California has implemented the
Standardized Emergency Response Management System (SEMS), the Sanitation District may
be called upon to assist in an emergency anywhere in the State through the Operational Area.
Staff intends on bringing an item to the Board of Directors in October 2005 on the National
Incident Management System (NIMS), which will replace SEMS.
The Sanitation District's mutual aid agreement authorizes the allocation of resources for
activities not directly related to OCSD operations and provides benefit to OCSD with respect to
requesting mutual aid from other organizations in the event of a disaster or other emergency
impacting Sanitation District operations.
The Board Chair and the General Manager have expressed interest in the Sanitation District
providing assistance in mutual aid activities that extend beyond the local or State levels. This
has occurred recently with respect to the Tsunami that struck Indonesia in January 2005 and
Hurricane Katrina, which struck the Gulf Coast at the end of last month (August 29, 2005).
The General Manager's recommendation provides the Board of Directors a measured level of
response should it be deemed appropriate for the Sanitation District to provide assistance.
ALTERNATIVES
• No Action.
• Deny the recommendation in its entirety.
• Approve "Release Time Agreements" only and no use of equipment.
• Approve vacation requests by employees, after consideration of OCSD business needs,
which allows employees the opportunity to volunteer time without regular pay.
C:\Documents and Settings\kawai\Local Settings\Temporary Internet Files\OLK72\ltem 18 Disaster Recovery Support.doc
Revised: 06/04/03 Page4
,-
·~
CEQA FINDINGS
N/A
ATTACHMENTS (to be distributed at the Board meeting)
1. OCSD Resolution No. 05-24
2. Draft -Release Time Agreement -Exempt Employees
3. Draft -Release Time Agreement -Non-Exempt Employees
C:\Documents and Settings\kawai\Local Settings\Temporary Internet Files\OLK72\ltem 18 Disaster Recovery Support.doc
Revised: 06/04103 Pages