HomeMy WebLinkAbout2004-11-17 SANI1a/O�ON ORANGE COUNTY SANITATION DISTRICT
9
November 10, 2004
phone:
(7141 962-2411
fax: NOTICE OF MEETING
(714)962-0356
www.ocsd.com
mailingOBo 8127 BOARD OF DIRECTORS
PO. Box 8127
Fountain Valley, ORANGE COUNTY SANITATION DISTRICT
92728-8127
street address:
10844 Ellis Avenue
Fountain Valley,CA
92706-7018 WEDNESDAY, November 17, 2004 — 7:00 P.M.
Member
Agencies
e DISTRICT'S ADMINISTRATIVE OFFICES
Cities 10844 Ellis Avenue
Anaheim Fountain Valley, California 92708
Brea
Buena Park
Cypress
Fountain Valley
Fullerton
Garden Grove The Regular Meeting of the Board of Directors of the Orange County Sanitation
Huntington Beach District will be held at the above location, time and date.
Irvine
La Habra
La Palma
Los Alamitos y
Newport Beach _
Orange ✓w/�'
Placentia /�
Santa Ana E�yard Secret ry
Seal Beach
Stanton
Tustin
Villa Park
Yorba Linda
County of Orange
OMTS COMMITTEE - Wednesday, December 1, 2004 at 5:00 p.m.
Sanitary Districts
Costa Mesa PDC COMMITTEE - Thursday, December 2, 2004 at 5:00 p.m.
Midway City
Water Districts FAHR COMMITTEE - Wednesday, December 8, 2004 at 5:00 p.m.
GWR SYSTEM STEERING COMMITTEE - Monday, December 13, 2004 at 5:30 p.m. @OCWD
STEERING COMMITTEE - Wednesday, December 15, 2004 at 5:00 p.m.
io maintain world-class leadership in wastewater and water resource management.
BOARD MEETING DATES
Board Meeting
*December 15, 2004
January 26, 2005
February 23, 2005
March 23, 2005
April 27, 2005
May 25, 2005
June 22, 2005
*July 20, 2005
August 24, 2005
September 28, 2005
October 26, 2005
*November 16, 2005
*Meetings are being held on the third Wednesday of the month
HAdeptladminlBSlAgenda12004 Meeting Notices1MN11.2.doc
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE:11/17/04 TIME: 7:00 p.m.
1 �
(SIMONIAN) .................... ANDERSON...................
(WILSON) ........................ BANKHEAD................... ✓ ,t1
(FRESCHI) ....................... BORTLE ................. .....
(AMBRIZ).......................... CAVECCHE...................
—,�
(GARCIA) ......................... CHRISTY..................... ✓" _� Al
(CRANDALL) .................... COLLINS ......................—,� �✓ 7-
(BROADWATER) ............ DALTON....................... el-,
(KAWASHIMA) ................. DAVERT...................... �/ &I css- Z
(SHAWVER) ................... DONAHUE.....................�
(WILSON)......................... DUVALL......................
(DICKINSON) ................... ECKENRODE................. ]'
(SCHAFER)...................... FERRYMAN................... ✓"
COERPER) ...................... GREEN.......................
(POE)................................ JEMPSA......................
(SHEA)
(DOW) .............................. MARSHALL.................. CL
(HERNANDEZ)................. MC CRACKEN...............
(SWAN) ............................ MILLER .........................� ,✓
(BEAUMAN) ..................... MOORE........................ ✓ _�
(EPPERSON) ................... NEUGEBAUER..............
(KEENAN) ........................ PIERCY........................
(WEBB) ............................ RIDGEWAY................... ✓
(SMITH, CHUCK) ............. SILVA........................... ✓ d `/
(HERMAN)........................ WALKER....................... ✓ d /�
(ANTOS) .......................... YOST .......................... ✓ �/
STAFF:
Anderson ✓ L �,,�a,l GLIa t�'�"
Beekman
Ghirelli
Kovac ✓ 7 ttc� i�tie��= _
Kyle
udwin
Miles ,✓
Ooten
Streed ✓
Tomko �✓
OTHERS:
Woodruff
Nixon
11/17/04
H:\dept\admin\BSOIRECTOR\Directors Roll Call.doc
SIGN-IN SHEET
ORANGE COUNTY SANITATION DISTRICT
BOARD MEETING
NAME ORGANIZATION/FIRM
leaseprint) leaseprint)
�✓
a 9-z A
�Nzc�V
v
1141 .411 6�� 444,�
f�
H:\WP.DTA\ADMIN\BS\FORMS\SIGN-IN FORM.DOC
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Board Secretary prior to commencement of the Board
meeting. As determined by the Chair, speakers may be deferred until the specific item is taken for
discussion. Remarks may be limited to three minutes or less. Any handouts (35 COPIES
REQUIRED) must be given to the Board Secretary prior to the meeting for distribution.
DATE: -1 1 - t-7- 09 AGENDA ITEM NO.
NAME: (please print) J-k Vl/, `&/I —L _0—
HOME ADDRESS: �'() �� y
(number/street)
UJ C_�O-) ���
(city/zip code)
TELEPHONE: (L4 2-fj 14'225` -' o-7�
f
REPRESENTING: \�\w16 �tJ.
(self/name of organization)
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Board Secretary prior to commencement of the Board
meeting. As determined by the Chair, speakers may be deferred until the specific item is taken for
discussion. Remarks may be limited to three minutes or less. Any handouts (35 COPIES
REQUIRED) must be g'ven to the Board Secretary prior to the meeting for distribution.
DATE: l -7 AGENDA ITEM NO.
/*
NAME: (please print) 'IV I
��
HOME ADDRESS: — �� =''���'
(numb- str et)
(city/ 'p code)
TELEPHONE:
REPRESENTING: `
(self/n me of organization)
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Board Secretary prior to commencement of the Board
meeting. As determined by the Chair, speakers may be deferred until the specific item is taken for
discussion. Remarks may be limited to three minutes or less. Any handouts (35 COPIES
REQUIRED) must be given to the Board Secretary prior to the meeting for distribution.
DATE: AGENDA ITEM NO.
NAME: (please print)
HOME ADDRESS: %%�/�/ �- ��✓�'i• � � /i
(number/street)
(cit�r/zip code)-'
TELEPHONE:
REPRESENTING: r :;
(self/name of organization)
k
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
Orange County Sanitation District
Wednesday, November 3, 2004— 5:00 P.M.
A meeting of the Operations, Maintenance and Technical Services Committee of the Orange
County Sanitation District (OCSD)was held on November 3, 2004, in the District's
Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
OMTS Directors Present: Staff Present:
Carolyn Cavecche, Chair Bob Ghirelli, Director of Technical Services
Anna Piercy, Vice Chair Bob Ooten, Director of Operations & Maintenance
Don Bankhead Patrick Miles, Director of Information Technology
Doug Davert Nick Arhontes, Manager of Regional Assets and
Cathy Green Services
Tod Ridgeway Penny Kyle, Committee Secretary
Paul Walker Jim Burror
Steve Anderson, Board Chair Sonja Wassgren
OMTS Directors Absent: Others:
James M. Ferryman, Board Vice Chair Phil Luebben
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Committee Chair Cavecche had no report.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 2
November 3, 2004
(5) REPORT OF THE GENERAL MANAGER
The General Manager was not present.
(6) CONSENT CALENDAR ITEMS
a. The minutes of the October 6, 2004 Operations, Maintenance and Technical Services
Committee meeting were approved as drafted and ordered filed.
b. OMTSO4-53 Receive and file Technical Services Monthly Report, which focuses on
regulatory, biosolids and performance, measures for the Technical
Services Department.
C. OMTSO4-54 Receive and file Operations & Maintenance Monthly Report, which
focuses on compliance, financial data and performance measures for the
Operations and Maintenance Department.
Motion: Moved, seconded and duly carried to approve the recommended actions
for items specified as 6(a) through (c) under Consent Calendar
(7) ACTION ITEMS
a. OMTSO4-55 Recommend to the Board of Directors to approve a Memorandum of
Understanding South Orange County Wastewater Authority for Phase 1
of the South Orange County Composting Facility for an amount not to
exceed $69,637, to be shared equally with South Orange County
Wastewater Authority, in a form approved by General Counsel.
Jim Burror provided an overview of the project and the initial steps that
must be taken before the development of this facility, which would be
located in South Orange County.
Motion: Moved, seconded and duly carried to recommend approval to the Board
of Directors.
b. OMTSO4-56 Recommend to the Board of Directors to approve Amendment No. 2 to
the Consultant Services Agreement with Brown & Caldwell Consulting,
providing for additional consulting services in connection with the Santa
Ana Regional Water Quality Control Board's newly adopted Waste
Discharge Requirements, for an additional amount of$730,000, to include
a $100,000 contingency, increasing the total amount not to exceed
$1,430,000, for the time period of January 1, 2005 through December 31,
2005,
Motion: Moved, seconded and duly carried to recommend approval to the Board
of Directors.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 3
November 3, 2004
(8) INFORMATIONAL ITEMS
a. OMTSO4-57 Proposed North County Yard Facilities
Nick Arhontes, Manager of Regional Assets and Services, reported there has been a
need for Operations & Maintenance staff to have a more centralized facilities yard.
Currently staff and equipment are based out of Plant 2 in Huntington Beach. The
Source Control and Engineering departments have also expressed an interest in basing
limited staff in a more centralized location. Staff is looking for a 4 Y2- 5 acre site, and a
building of 25,000 square feet, and are working towards refining the costs and needs for
the facility.
(9) REPORT OF DIRECTOR OF INFORMATION TECHNOLOGY
Patrick Miles, Director of Information Technology, reported an update on the District's
information system security program and steps taken to have the information system certified by
a leading information security firm would be provided at the following month's meeting. Staff
has been working on the program for approximately one year, and new policies and procedures
would be reviewed by the OMTS Committee.
Mr. Miles noted the District has crossed the one millionth e-mail based on spam messages that
are received per month, which has increased over 250%for the last three years.
(10) REPORT OF DIRECTOR OF OPERATIONS AND MAINTENANCE
The Director of Operations and Maintenance had no report.
(11) REPORT OF DIRECTOR OF TECHNICAL SERVICES
Bob Ghirelli, Director of Technical Services, reported the District's new ocean discharge permit
became effective on October 31, 2004, and would be in effect for five years. The permit is
essentially the same as before and includes the addition of full secondary treatment. The
District is building facilities to meet secondary treatment standards but most of the facilities will
not be completed until 2012. A consent decree has been negotiated with EPA and the State
Regional Water Quality Control Board which allows the District until 2012 to meet the secondary
treatment requirements with no penalties. A press release will be sent once the consent decree
is filed with the courts.
(12) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
There were none.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 4
November 3, 2004
(14) FUTURE MEETING DATES
The next Operations, Maintenance and Technical Services Committee meeting is scheduled for
December 1, 2004 at 5 p.m.
(15) CLOSED SESSION
There was no closed session.
(16) ADJOURNMENT
The Chair declared the meeting adjourned at 5:35 p.m.
Submitted by:
Penny yle
Operations, Mainten a and Technical Services
Committee Secretary
H:Adeptlagendal0MTS1200411104\110304 OTMS Minutes.doc
> a
MINUTES OF PLANNING, DESIGN, AND CONSTRUCTION
COMMITTEE MEETING
Orange County Sanitation District
Thursday, November 4, 2004, at 5 p.m.
A meeting of the Planning, Design, and Construction Committee of the Orange County
Sanitation District was held on Thursday, November 4, 2004, at 5 p.m., in the District's
Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
PDC COMMITTEE MEMBERS: STAFF PRESENT:
Directors Present: David Ludwin, Director of Engineering
Alice Jempsa, Vice Chair John Linder, Construction Manager
Alberta Christy Jim Herberg. Engineering Manager
John Collins Matt Smith, Engineering Manager
Norm Eckenrode Tod Haynes, Engineering Supervisor
Beth Krom Jim Burror, Engineering Supervisor
Patsy Marshall Jennifer Cabral, Public Information Specialist
Steve Anderson, Board Chair Gail Garrett, Committee Secretary
Directors Absent: OTHERS PRESENT:
Brian Donahue, Chair Ralph Eberts
Paul Yost
Jim Ferryman, Board Vice Chair
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Committee Vice Chair Alice Jempsa did not make a report.
(5) REPORT OF THE GENERAL MANAGER
General Manager was not present.
6 .
PDC Committee Minutes
Page 2
November 4, 2004
(6) REPORT OF THE DIRECTOR OF ENGINEERING
Director of Engineering David Ludwin reported on construction progress at the Bushard Intersections
and street restoration, which will be completed end of November. He gave a summary progress
report to date. Mr. Ludwin advised that revised submittal for the 108-inch pipe received from the pipe
supplier is currently under review by District staff and its consultant. Mr. Ludwin informed that
property damage complaints are being reviewed by a third party adjuster, David Morse.
A brief summary was presented of overall liquidated damages that have been accruing since March
of 2004. Mr. Ludwin informed that in December, staff will be requesting ratification of a unilateral
change order for acceptable time delays. Analysis of the dewatedng and vibration study by the
geotechnical consultant retained by General Counsel's office is proceeding. The consultant will
provide a draft report next week which will be discussed in closed session at the next PDC meeting
on December 2"d
Beth Krom arrived at 5:25 p.m.
Jennifer Cabral, Public Information Specialist, provided an update on the outreach activities for the
Bushard project and the 14th and "A" Street Pump Station project. Fact sheets have been provided to
schools, homeowners associations, and letters have been distributed to offer one-on-one meetings
with residents to address individual concerns.
Director Collins questioned whether the Bushard project resumption next year and the Ellis Pump
Station construction will coincide. Tod Haynes, Engineering Supervisor, acknowledged that
possibility. He also noted that staff is working with the Water District in coordinating their project with
ours.
Mr. Ludwin reported that the contractor has begun work on the emergency repairs to the SARI line.
District staff gave a presentation to the Yorba Linda City Council and, with Director Duvall's support,
will obtain the necessary permits. Rip-rap protection of the pipeline will be completed in late
December. Staff is working with the Corps of Engineers, County of Orange, California Department of
Fish and Game, and has notified the Bicycle Coalition of the project.
John Linder, Construction Manager, presented the revised language and clarifications for
Construction Change Order definitions. Director Krom noted that the request for language
clarification was to identify cost accountability. Directors approved the changes.
Alberta Christy arrived at 5:45 p.m.
Action Item: Mr. Ludwin will have General Counsel approve the proposed language for change
order definitions.
(7) REPORT OF GENERAL COUNSEL
General Counsel did not give a report.
PDC Committee Minutes
Page 3
November 4, 2004
(8) CONSENT CALENDAR (Items a-g)
a. MOVED, SECONDED AND DULY CARRIED TO: Receive, file, and approve
draft minutes of the October 7, 2004 Planning, Design, and Construction
Committee Meeting.
f. PDC04-89 MOVED, SECONDED AND DULY CARRIED TO: Recommend to
the Board of Directors to ratify Change Order No. 5 to Warner
Avenue Relief Sewer, Contract No. 11-22, with ARB, Inc.,
authorizing a deduction of$308,378, decreasing the total contract
amount to $5,198,580.
g. PDC04-90 MOVED, SECONDED AND DULY CARRIED TO: Ratify Change
Order No. 1 to Gisler-Redhill Trunk Improvements, Reach "A",
Contract No. 7-36; Orange Trunk Improvements, Contract No. 7-
39; Gisler-Redhill/North Trunk Improvements, Contract No. 7-41;
and City of Tustin Project Nos. 6106 and 6151,with ARB, Inc.,
authorizing an addition of$349,612 and 20 calendar days,
increasing the total contract amount to $18,725,611.
END OF CONSENT CALENDAR
There were no items deleted from Consent Calendar.
9. INFORMATIONAL ITEM (Item a)
a. PDC04-97 Future Orange County Sanitation Flow Projections for IRWD and SAWPA.
Jim Herberg, Engineering Manager, reported on the OCSD Flow
Projections based on service area population projections, and planned
discharges from Irvine Ranch Water District (IRWD) and the Santa Ana
Watershed Protection Agency(SAWPA), as well as Alternative Flow
Assumptions for the year 2020. Mr. Herberg handed out a comparison
document demonstrating the four Flow scenarios and Engineering's
recommendation for Scenario 3.
Director Collins requested that this informational item be moved to the
Board as an action item at the November Board meeting. Chairman
Anderson concurred.
PDC Committee Minutes
Page 4
November 4, 2004
10. ACTION ITEMS (items a-fl
a. PDC04-91 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to ratify Change Order No. 10 to Bushard Trunk Sewer
Rehabilitation, Job No. 1-2-4, with Steve P. Rados, Inc., authorizing an
addition of$242,360, increasing the total contract amount to $31,911,805.
There were questions and discussion regarding item 6 regarding the
removal and replacement of old waterlines. These questions were
addressed and explained by John Linder.
b. PDC04-92 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to approve Professional Services Agreement with
Malcolm Pimie, Inc. for preparation of a Preliminary Design Report for the
Coast Trunk Sewer Rehabilitation, Contract No. 11-26, for an amount not
to exceed $2,219,330.
C. PDC04-93 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to approve Amendment No. 2 to the Professional
Services Agreement with Camp, Dresser& McKee for Rehabilitation of
Odor Control Facilities, Job No. J-71-8, providing for modifications to the
scope of work for an additional amount of$645,674, increasing the total
amount not to exceed $4,220,881.
Director Marshall questioned using staff from the same company to
conduct the value engineering effort, and suggested hiring independent
consultants for future projects. The results of the value engineering will
be reported to the PDC Committee at a future meeting.
d. PDC04-94 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to approve Amendment No. 7 to the Professional
Services Agreement with Boyle Engineering Corporation for Bushard
Trunk Sewer Rehabilitation, Job No. 1-2-4, providing for additional
engineering construction support services for an additional amount of
$326,509, increasing the total amount not to exceed $2,345,920.
e. PDC04-95 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to approve Amendment No. 1 to the Professional
Services Agreement with Fluor Enterprises, Inc. for Electrical Equipment
Refurbishment and Protection, Job No. SP-81, providing for additional
engineering services for an additional amount of$128,549, increasing the
total amount not to exceed $214,049.
f. PDC04-96 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to approve Professional Services Agreement with
Black &Veatch Corporation to provide an Energy Master Plan for the
Treatment Plant Strategic Plan Update, Job No. J-102, for an amount not
to exceed $1,894,660.
PDC Committee Minutes
Page 5
November 4, 2004
Jim Burror introduced Ralph Eberts, Project Manager with Black&Veatch.
Chairman Anderson suggested that Southern California Edison should be
contacted to determine the level of assistance that could be provided.
(11) CLOSED SESSION
There was no closed session.
(11) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
Director Christy announced she would not be attending the December Steering and Board
Meetings.
(12) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(14) FUTURE MEETINGS DATES
The next Planning, Design, and Construction Committee Meeting is scheduled for Thursday,
December 2, 2004 at 5 p.m.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 7:00 p.m.
Submitted by:
6'6�- 601A�
Gail Garrett
PDC Committee Secretary
H:1dep11agenda\PDC\PDc Minutes Form.doc
f.
P
r
MINUTES OF FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE MEETING
Orange County Sanitation District
Wednesday, November 10, 2004, 5:00 p.m.
A meeting of the Finance, Administration and Human Resources Committee of the Orange
County Sanitation District was held on November 10, 2004, at 5:00 p.m., in the District's
Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
FAHR COMMITTEE MEMBERS: STAFF PRESENT:
DIRECTORS PRESENT: Blake P. Anderson, General Manager
Roy Moore, Chair Gary Streed, Director of Finance/Treasurer
Mike Duvall, Vice Chair Carol Beekman, Director of Communications &
Patricia Bortle Administrative Services
Bill Dalton Mike White, Controller
Shirley McCracken Lisa Arosteguy, Human Resources Supervisor
Darryl Miller Ann Sullivan, Human Resources Analyst
Joy Neugebauer Dionne Kardos, Public Relations
James W. Silva Penny Kyle, Committee Secretary
Steve Anderson, Board Chair Lilia Kovac, Assistant Committee Secretary
DIRECTORS ABSENT: OTHERS PRESENT:
Jim Ferryman, Vice Board Chair Donna Carter
Robbynn Lystrup
Mike Moreland
Nepa Shah
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
The Chair had no report.
(5) REPORT OF THE GENERAL MANAGER
Blake Anderson, General Manager, announced a reception would be held for Wes Bannister at
6:30 p.m. prior to the Board Meeting on November 17`h. He also encouraged directors to attend
the Orange County Leadership Symposium that would be held on January 14-16, 2005.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 2 v
1
November 10, 2004
(6) REPORT OF DIRECTOR OF FINANCE/TREASURER
Gary Streed, Director of Finance/Treasurer, referred to the Treasurer Report distributed that
evening. He reported that rate adjustment hearing notifications have been sent to all permit users.
(7) REPORT OF DIRECTOR OF HUMAN RESOURCES
The Director of Human Resources representative had no report.
(8) REPORT OF DIRECTOR OF COMMUNICATIONS &ADMINISTRATIVE SERVICES
Carol Beekman, Director of Communications &Administrative Services, reported on the "Nerissa"
christening that was held on November 6t'at the Newport Harbor Nautical Museum. 260 people and
five Board members attended the event along with 34 employee volunteers who helped with the
event. Lilia Kovac, Assistant Board Secretary, was introduced to the Directors.
(9) REPORT OF GENERAL COUNSEL
General Counsel was not present.
(10) CONSENT CALENDAR ITEMS
a. Approve minutes of the October 13, 2004, Finance, Administration and Human
Resources Committee meeting, as corrected.
b. FAHR04-93 Recommend to the Board of Directors to receive and file Treasurer's
Report for the month of October 2004.
C. FAHR04-94 Receive and file Certificates of Participation (COP) Monthly Report.
d. FAHR04-95 Receive and file Employment Status Report as of October 21, 2004.
e. FAHR04-96 Receive and file OSHA Incidence Rates and Workers' Compensation
Claims and Costs Report.
f. FAHR04-97 Recommend to the Board of Directors to receive and file the Quarterly
Investment Management Program Report for the period July 1, 2004
through September 30, 2004.
g. FAHR04-98 Recommend to the Board of Directors to receive and file the 2004-05
First Quarter Financial Report for the period ending September 30, 2004.
h. FAHR04-99 Recommend to the Board of Directors to receive and file the SWAP
Report for the quarter ended September 30, 2004.
MOTION: It was moved, seconded and duly carried to approve the recommended
actions for items specified as 10(a)through (h) under Consent Calendar.
END OF CONSENT CALENDAR
t
Minutes of the Finance,Administration and Human Resources Committee Meeting
Page 3
November 10, 2004
(11) ACTION ITEMS
a. FAHR04-100 Recommend to the Board of Directors to: (1)Approve the reclassification
of two District employees and one position upgrade; and,
(2) Approve the pay range placement of the Director of Communications
and Administrative Services.
Ann Sullivan, Human Resources Analyst gave a brief report outlining the
employee re-classifications and position upgrade.
MOTION: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
b. FAHR04-101 Approve a one-time only non-base building payment for the Director of
Technical Services in an amount not to exceed $7,948 for his service as
Acting General Manager.
Blake Anderson reported that Bob Ghirelli was the acting General
Manager for approximately two months and did an extraordinary job. He
was recommending the approval of a one-time only non-base building
payment for the additional responsibilities. The Directors discussed the
calculation to derive to the amount of the payment and expressed
concern that the payment was somewhat excessive.
MOTION: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
C. FAHR04-102 Authorize the General Manager to solicit Requests for Proposal and
subsequently award a Consultant Services Agreement for Phase 2 of the
Corporate Identity and Public Awareness Project, Specification
No. CS-2003-16213D, in an amount not to exceed $20,000.
Carol Beekman, Director of Communications & Administrative Services
introduced Donna Carter and Robbynn Lystrup of Johnson/Ukropina who
reviewed the findings for Phase 1 of the Corporate Identity Program. The
Directors concluded that the District should not make a change to its
name or logo, nor add a tag line, but should develop an identity standards
manual at an estimated cost of$5,00047,500.
It was then moved, seconded and duly carried to recommend approval to
the Board of Directors to proceed with no change in name or logo, no
added tag line, and develop an identity standards manual at a cost
estimated between $5,000 to $7,5000. Directors also requested that
should a tag line be considered during the development of the identity
standards, that the item be brought back to the FAHR Committee for
consideration.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 4
November 10, 2004
MOTION: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
d. FAHR04-103 Recommend to the Board of Directors to receive and file FY 03/04
Comprehensive Annual Financial Report.
Mike White, Controller, provided a brief review of the new CAFR. Mike
Moreland of Moreland and Associates reported there were no areas of
concern discovered during their financial audit.
MOTION: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
(12) INFORMATION PRESENTATIONS
a. FAHR04-104 Status and Impact of State Property Tax Shift for 2004-05 and 2005-06
Gary Streed, Director of Finance, reported the expected tax shift would be
$16 million each year for two years. The FAHR Committee would be
having a discussion on 2005-06 cash flows with the budget assumptions
in December.
(13) CLOSED SESSION
The Committee convened in Closed Session at 6:31 p.m. pursuant to Government Code
Section 54957.6 to discuss and consider Agenda Item Nos. 13(a) (1) and (2). Confidential
Minutes of the Closed Session held by the Finance, Administration and Human Resources
Committee have been prepared in accordance with California Government Code Section
54957.2, and are maintained by the Board Secretary in the Official Book of Confidential Minutes
of Board and Committee Closed Meetings. A report of the actions taken will be publicly
reported at the time the approved action becomes final re Agenda Items Nos. 13(a)(1)and (2).
RECONVENE IN REGULAR SESSION: At 7:05 p.m., the Committee reconvened in regular
session.
(14) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
There were none.
(15) CONSIDERATION OF UPCOMING MEETINGS
The next FAHR Committee meeting is scheduled for December 8, 2004 at 5 p.m.
(16) ADJOURNMENT
The Chair declared the meeting adjourned at 7:05 p.m.
C
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 5
' November 10, 2004
Submitted by:
AUX
Penny M. kyle
FAHR Committee 4cretary
H:\dept\agenda\FAHR\FAHR2004\1004\101304 FAHR Minutes.doc
Orange County Sanitation District
MINUTES
BOARD MEETING
OCTOBER 27, 2004
sA�rrrar�o
o
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
Minutes for Board Meeting
Page 2
E 10/27/04
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was
held on October 27, 2004, at 7:00 p.m., in the District's Administrative Offices. Following the
Pledge of Allegiance and invocation the roll was called and the Secretary reported a quorum
present as follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
X Steve Anderson, Chair Steve Simonian
X James M. Ferryman, Vice Chair Arlene Schafer
X Don Bankhead Leland Wilson
X Patricia Bortle Rich Freschi
X Carolyn Cavecche Steve Ambriz
X Alberta Christy Mike Garcia
X John Collins Larry Crandall
X Bill Dalton Bruce Broadwater
X Doug Davert Tony Kawashima
A Brian Donahue David Shawver
X Michael Duvall Keri Lynn Wilson
X Norman Z. Eckenrode Judy Dickinson
X Cathy Green Gil Coerper
X Alice B. Jempsa Marilynn M. Poe
X Beth Krom Christina Shea
X Patsy Marshall Jim Dow
X Shirley McCracken Bob Hernandez
X Darryl Miller Peer A. Swan
X Roy Moore John Beauman
X Joy Neugebauer Grace Epperson
X Anna L. Piercy Tim Keenan
X Tod Ridgeway Don Webb
X Jim Silva Chuck Smith
X Paul Walker Lary Herman
A Paul Yost Charles Antos
STAFF MEMBERS PRESENT: Blake P. Anderson, General Manager; Penny Kyle, Board
Secretary; Carol Beekman; Bob Ghirelli; Dave Ludwin; Patrick Miles; Bob Ooten; Gary Streed;
Lisa Tomko; Mike Moore; Mike McCarthy; Rose Marsella; Paula Zeller; Mark Kawamoto
OTHERS PRESENT: Thomas L. Woodruff, General Counsel; Brad Hogin; Phil Luebben; Don
Hughes; Mike Bilyk; Brian Keating; Jim Willett; Kazumi Kuniyasu; Paul Higa; Ray Albert; Allen
Shiroma; Art Sikat; Rick Hertel; Greg Woodside
Minutes for Board Meeting ,
Page 3
10/27/04
3. MOVED, SECONDED AND DULY CARRIED: Receive and file minute excerpts from the
following re appointment of active and alternate Directors, as follows:
City/Agency Active Director Alternate Director
Tustin Doug Davert Tony Kawashima
PUBLIC COMMENTS
Jim Willett, president of The Yakima Company, addressed the Directors requesting the District
to honor the biosolids contract currently in effect with his company.
General Counsel Tom Woodruff responded to comments made by Mr. Willett explaining the
District was not in violation of its existing contract with The Yakima Company. Mr. Woodruff
limited his comments regarding this issue due to possible litigation.
REPORT OF THE CHAIR
Chair Anderson welcomed back Director Don Bankhead from his knee surgery and Blake
Anderson from his heart surgery.
It was announced that Director Doug Davert was appointed to the OMTS Committee.
The calendar for the working committees was reviewed for the month of November. The
Cooperative Projects Grants Committee would be held on November 2"d at 11:30 a.m., and the
Urban Runoff Ad Hoc Committee was scheduled to meet on Wednesday, December 1s', at 3:00
p.m. It was also noted that due to the Thanksgiving holiday, the Board of Directors regular
meeting would be held on Wednesday, November 171h.
Chair Anderson also reminded the Directors that the christening ceremony for the District's
ocean monitoring vessel, "Nerissa", would be held on November 61' from 10:00 a.m. to
2:00 p.m., at the Newport Harbor Nautical Museum.
REPORT OF THE GENERAL MANAGER
Blake Anderson, General Manager, commended Bob Ghirelli, Director of Technical Services, for
doing an outstanding job as Acting General Manager while he was out on medical leave.
It was noted the District was the recipient of two awards: (1) Water Reuse Association 2004
Public Education Program of the Year for the Groundwater Replenishment System presented to
Orange County Water District and Orange County Sanitation District; and (2) Environmental
Protection Agency—2004 National Special Recognition Clean Water Act Award — Biosolids
Exemplary Management with regard to Orange County Sanitation District's environmental
management systems that were certified the prior year.
Mr. Anderson referred Directors to talking points included in their meeting folder regarding
federal funding for secondary treatment as requested by Director Christy the prior month.
Bob Ghirelli then recognized employee Mike McCarthy for 25 years of service to the District.
Minutes for Board Meeting
Page 4
E 10/27/04
REPORT OF THE GENERAL COUNSEL
Thomas L. Woodruff, General Counsel, reported the District received 50 claims for damages filed by
the same law firm on behalf of property owners for$2 million each in connection with the Bushard
Trunk Sewer project. The claims have been tendered to the construction company, Steve Rados,
and their insurance carrier for handling. It was noted that a few weeks prior seven claims were
submitted and the contractor's insurance company rejected four of them. Two of the claims are for
alleged property damage 2.1 miles from the project. Claims will be closely monitored by District's
staff to ensure there are no unreasonable rejections.
APPROVAL OF MINUTES
The Chair ordered that the minutes of the regular meeting held September 22, 2004, be
deemed approved, as written.
Directors Don Bankhead and Patricia Bortle abstained.
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and "B", attached hereto and made a part of these minutes.
ALL DISTRICTS 09/15/04 09/30/04
Totals $23,643,437.08 $12,735,711.95
Director Dalton abstained from discussion and voting on Warrant No. 64277. Director Green
abstained from discussion and voting on Warrant Nos. 65344 and 65389. Director Davert
abstained from discussion and voting on Warrant Nos. 65020, 65025, and 65396. Director
Eckenrode abstained. Abstentions were pursuant to California Government Code Section
84308.
CONSENT CALENDAR
9. a. MOVED, SECONDED AND DULY CARRIED: Receive and file Summons and
Complaint, Orange County Transportation Authority v. Orange County Sanitation
District, et al, Orange County Superior Court Case No. 04CC09849, re Complaint
in Eminent Domain; and authorize the General Counsel to select Special
Counsel to appear and defend the interests of the District.
b. MOVED, SECONDED AND DULY CARRIED: Receive and file Summons and
Complaint, Southern California Edison Company v. Orange County Sanitation
District and Steve P. Rados, Inc., Orange County Superior Court Case No.
04WL05251, re Complaint for Damages in connection with the Bushard Trunk
Sewer Rehabilitation, Job No. 1-2-4; refer to Contractor and Contractor's Insurer
to defend and indemnify the District; and authorize the General Counsel to
appear and defend the interests of the District in the event of Contractor's failure
to appear and respond to the Complaint within the time required.
Minutes for Board Meeting ,
Page 5
10/27/04 '
C. MOVED, SECONDED AND DULY CARRIED: Approve an "A" Street Pump
Station Landscaping, Parking and Easement Agreement with the city of Newport
Beach, in connection with Rehabilitation of"A" Street Pump Station, Contract
No. 5-52, in a form approved by General Counsel.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. DRAFT STEERING COMMITTEE: A verbal report was presented by Director Anderson,
Chair of the Steering Committee, re the October 27, 2004 meeting.
Chair Anderson reported the General Manager updated the Committee on his meeting
with SAWPA's Acting General Manager, Daniel Cozad. Mr. Cozad was also invited to
attend the Steering Committee meeting that evening where he provided remarks to the
Committee.
Representatives from the Huntington Beach Visitors& Convention Bureau attended the
meeting and requested that the District fund an advertising campaign to improve the
image of Orange County beaches and water quality. The Steering Committee agreed
that Chair Anderson would meet with the mayors of Huntington Beach, Newport Beach
and Seal Beach to discuss the matter, and then assign a standing committee for
consideration of staff recommendations concerning the issue.
Blake Anderson, General Manager, briefed the Committee on the impact of the recent
rainstorm. It was also reported that temporary repairs for the SARI line will occur as
soon as the flow in the river subsides. The cost will be approximately$635,000.
Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order the Steering Committee Minutes
for the meeting held on September 22, 2004 to be filed.
Non-Consent Calendar
No items considered.
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
OMTS Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Operations,
Maintenance and Technical Services Committee Minutes for the meeting held on
October 6, 2004 to be filed.
OMTS Non-Consent Calendar
No items considered.
Minutes for Board Meeting
Page 6
10/27/04
13. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Planning, Design and
Construction Committee Minutes for the meeting held on October 7, 2004 to be
filed.
b. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No. 1 for
Anaerobic Selector Mixing Systems, Job No. SP-74,with DenBoer Engineering
and Construction, Inc., authorizing an addition of$25,607 and a time extension of
237 calendar days, increasing the total contract amount to $470,607; and,
(2) Accept Anaerobic Selector Mixing Systems, Job No. SP-74, as complete, and
approve the Final Closeout Agreement.
C. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 15 to
Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37, with Margate
Construction, authorizing an addition of$67,937 and 143 calendar days,
increasing the total contract amount to $71,377,380.
d. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 4 to
Warner Avenue Relief Sewer, Contract No. 11-22, with ARB, Inc., authorizing an
addition of$47,616, increasing the total contract amount to $5,506,958.
e. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 1 to
Secondary Treatment Facilities Process Upgrades at Plant No. 2, Job No.
P2-47-3, with Morrow-Meadows Corporation, authorizing an addition of
$205,903, increasing the total contract amount to $ 4,917,903.
f. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 3 to
Trickling Filter Rehabilitation and New Clarifiers, Job No. P1-76, with J.R. Filanc
Construction Company, Inc., authorizing an addition of$123,258, increasing the
total contract amount to $33,075,853.
g. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 1 to the
Professional Services Agreement with SPEC Services, Inc. for Plant No. 1 Plant
Water VFD Replacement, Job No. SP-94, providing for additional engineering
services, for an additional amount of$26,384.58, increasing the total amount not
to exceed $115,863.58.
h. MOVED, SECONDED AND DULY CARRIED: (1) Approve time extensions to
Cooperative Projects Grant Program contracts with the Cities of Anaheim
(Contract Nos. 0202, 0301 and 0302)and Orange (Contract No. 0130); and,
(2)Approve Orange County Sanitation District funding for Cooperative Projects
for Fiscal Year 2004-05, totaling $2,386,537, as recommended by the
Cooperative Projects Grant Committee.
Minutes for Board Meeting
Page 7
10/27/04 '
i. MOVED, SECONDED AND DULY CARRIED: Approve Professional Services
Agreement with Dudek &Associates, Inc. for engineering services for the
Rehabilitation of District Siphons, Contract No. 2-68, for an amount not to exceed
$987,156.
PDC Non-Consent Calendar
No items considered.
14. FINANCE, ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHR)
FAHR Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Finance,
Administration and Human Resources Committee Minutes for the meeting held
on October 13, 2004 to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Receive and file Treasurer's
Report for the month of September 2004.
C. MOVED, SECONDED AND DULY CARRIED: Approve SAFETY-POL-402,
Workers' Compensation Benefits and Leave Program, as provided for in
Resolution No. OCSD 02-5, regarding the District's Injury and Illness Prevention
Program Policy.
d. MOVED, SECONDED AND DULY CARRIED: Approve SAFETY-POL-404, Early
Return To Work Program, as provided for in Resolution No. OCSD 02-5,
regarding the District's Injury and Illness Prevention Program Policy.
e. MOVED, SECONDED AND DULY CARRIED:. (1)Approve the Agreement to
Terminate Collection of Sewer Connection Charges with the City of Westminster
for the collection of capital facilities capacity charges, in a form approved by
General Counsel; and,
(2) Approve the Agreement for Collection of Capital Facilities Capacity Charges
with the Midway City Sanitary District, in a form approved by General Counsel.
f. MOVED, SECONDED AND DULY CARRIED: (1)Approve a Lease Agreement
with Nautical Yacht Sales for the period of 21 months, commencing September
1, 2004 through May 31, 2006, at the rate of$5,000 per month for a portion of
the site acquired by the District for the new Rocky Point Pump Station; and,
(2)Approve an Office Lease Agreement with John R. Finnell on a
month-to-month basis, commencing September 1, 2004, at the rate of$250 per
month for a portion of the site acquired by the District for the new Rocky Point
Pump Station.
Minutes for Board Meeting
Page 8
10/27/04
FAHR Non-Consent Calendar
No items considered.
15. GWR SYSTEM STEERING COMMITTEE (GWRSSC)
GWRSSC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Cooperative Committee Minutes for the meetings held on
September 13 and 27, and October 11, 2004 to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Approve a Professional Services
Agreement with Porter Novelli, providing for one year of additional services for
the public information and outreach program for the Groundwater Replenishment
System, Job No. J-36, for an amount not to exceed $615,000, to be equally cost
shared with the Orange County Water District.
GWRSSC Non-Consent Calendar
No items considered.
NON-CONSENT CALENDAR
16. Consideration to adopt Ordinance No. OCSD-25, An Ordinance of the Board of Directors
of Orange County Sanitation District, Adopting Fats, Oils and Grease Control
Regulations Applicable to Food Service Establishments:
Bob Ghirelli, Director of Technical Services, provided a brief report on comments
received from the City of Tustin. Those comments requested the removal of Articles 8
and 9. General Counsel and staff agree those articles do not need to be included in the
Ordinance.
a. MOVED, SECONDED AND DULY CARRIED: Read Ordinance No. OCSD-25 by
title only and waive reading of said entire ordinance.
b. MOVED, SECONDED AND DULY CARRIED: Introduce Ordinance
No. OCSD-25, and pass to second reading and public hearing on November 17,
2004.
17. Consideration to adopt Ordinance No. OCSD-24, An Ordinance of the Board of Directors
of Orange County Sanitation District, Adopting Revised Table G re Permittee Charges
for Use and Reaffirming All Other Charges:
"An Ordinance of the Board of Directors of Orange County Sanitation District
Establishing Sanitary Sewer Service Charges; Establishing Capital Facilities
Capacity Charges; Adopting Miscellaneous Charges and Fees relating to
Industrial Charges, Source Control Permittees and Wastehaulers; and Repealing
Ordinance No. OCSD-22".
Minutes for Board Meeting 1
Page 9
10/27/04 '
Public comments were received from Brian Keating of Kimberly Clark; Allen Shiroma of
Jazz Semiconductor; Rick Hertel of House Foods; and Mike Bilyk of Vanlaw Food
Products. They expressed concern over the increased rates their businesses would
need to pay due to the revised rate structure.
Gary Streed, Director of Finance, provided a brief report on the need for the Ordinance
which incorporates a corrected calculation to assess the user fees for industries.
Directors entered into lengthy discussion regarding the impact of the fees to local
businesses and the commitment to move to full secondary treatment.
a. MOVED, SECONDED AND DULY CARRIED: Read Ordinance No. OCSD-24 by
title only and waive reading of said entire ordinance.
b. MOVED, SECONDED AND DULY CARRIED: Introduce Ordinance
No. OCSD-24, and pass to second reading and public hearing on November 17,
2004.
Directors Bankhead; Bortle; Christy; Dalton; Eckenrode; Marshall; and Walker
opposed.
18. Dave Ludwin, Director of Engineering, requested that the cost for emergency repairs of
the Santa Ana River Interceptor be amended to $635,000. It was noted that SAWPA is
obligated to pay 76% of the costs for emergency repair. Some Directors expressed
concerned that the need for emergency repairs was not disclosed earlier.
MOVED, SECONDED AND DULY CARRIED: Ratify the use of the General Manager's
emergency purchasing authority pursuant to Resolution No. OCSD 04-08, to take
actions necessary for the Emergency Repair of the Santa Ana River Interceptor,
Contract No. 2-41-3, in an amount not to exceed $635,000.
19. CONVENE IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS
54956.9 AND 54956.8: The Board convened in closed session at 8:40 p.m. pursuant to
Government Code Sections 56956.9 and 54956.8. Confidential minutes of the Closed
Session held by the Board of Directors have been prepared in accordance with
California Government Code Section 54957.2 and are maintained by the Board
Secretary in the Official Book of Confidential Minutes of Board and Committee Closed
Meetings. No reportable actions were taken re Agenda Item Nos. 19(a)(1), (2) and (3).
RECONVENE IN REGULAR SESSION: At 8:59 p.m., the Board reconvened in regular
session.
ADJOURNMENT: The Chair declared the meeting adjourned at 9:00 p.m.
Penny M. 1414k
Secretary oq the Boa of Directors of
Orange County Sanitation District
HAdeptladmin\BS\Minutes1102704 minutes.doc
Claims Paid From 09/01/04 to 09/15/04
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
64782 Southern California Edison $ 70,809.22 Power
64783 Airgas Safety,Inc. 1,523.61 Safety Supplies
64784 Alan Jeffery 745.75 Reconciliation User Fee Refund Program
64785 American Airlines 3,531.00 Travel Service
64786 American Chemical Society 264.00 Membership
64787 American Society for Quality 109.00 Membership
64788 Aquarium Doctor 105.44 Human Resources Aquarium Service
64789 American Telephone&Telegraph Corp. 1,604.26 Telephone Conference Services
64790 American Telephone&Telegraph Corp. 634.62 Telephone Service
64791 Bell Pipe&Supply Co. 562.59 Piping Supplies
64792 BMC:Business Machines Consultants,Inc 1,838.72 (1)Stapler/Slacker
64793 City of Tustin 631.25 Water Use
64794 Court Order 150.00 Wage Garnishment
64795 Compressor Components of California 15,513.71 Valves
64796 Consolidated Elect.Distributors,Inc. 8.13 Electrical Supplies
64797 Consumers Pipe&Supply Co. 840.19 Plumbing Supplies
64798 Cooper Energy Services 23,544.37 Engine Supplies
64799 County of Orange 182.14 Wage Garnishment
64800 Court Trustee 69.12 Wage Garnishment
64801 Danka Office Imaging 151.81 HP LaserJet Printer Repairs&Maint.
64802 Department of Child Support Services 188.50 Wage Garnishment
64803 DHL Express(USA),Inc. 18.80 Freight Services
64804 Employee Benefits Specialists,Inc. 9,688.15 Reimbursed Prepaid Employee Medical&Dependent Care
64805 Court Order 445.00 Wage Garnishment
64806 Executive Software 1,150.62 Software Maint.Agreement
64807 EDT Aktiengesellschaft 22,500.00 Mechanical Parts&Supplies
64808 FedEx Corporation 183.82 Freight Services
64809 Fisher Scientific 118.81 Lab Supplies
64810 Franchise Tax Board 50.00 Wage Garnishment
64811 Fry's Electronics 293.02 Computer Supplies
64812 G.E.Modular Space 377.13 Field Office Trailer at PII.1-Additional Costs
64B13 GBC(General Binding Corp) 47.47 Lab Parts&Supplies
64814 Haestad Methods 1,155.00 Software&Support
64815 Harbour Engineering Group 6,158.06 Impeller Liners
64816 City of Huntington Beach 17,962.62 Water Use
64817 Industrial Metal Supply 76.72 Metal
64818 Internal Revenue Service 300.00 Wage Garnishment
64819 Internal Revenue Service 200.00 Wage Gamishment
64820 Intl.Union of Oper.Eng.AFL-CIO Local 501 3,890.54 Dues Deduction
64821 Kelly Paper 104.54 Paper
64822 MassMutual Michel Financial Group 1,302.07 Executive Disability Plan Premium
64823 McMaster-Carr Supply Co. 1.110.63 Mechanical Parts,Maintenance Materials&Tools
64824 Midway Mfg.&Machining Co. 8,526.38 Belt Press Repairs&Maintenance Service
64825 Court Order 225.00 Wage Garnishment
64826 National Bond&Trust 2.439.20 U.S.Savings Bonds Payroll Deductions
64827 City of Newport Beach 44.04 Water Use
64828 Orange Fluid System Technologies,Inc. 713.68 Plumbing Parts&Supplies
64829 Orco Construction Supply 142.76 Marking Paint&Tools
H:ldeptT:n12101CRANEIFAHRIFAHR20041SEP71Claims Paid Report-091504.xis EXHIBIT A
e MO/?c Page 1 of 9 912en004
Claims Paid From 09101/04 to 09/15/04
Warrant No. Vendor Amount Description
64830 OCEA 598.98 Dues Deduction
64831 Court Order 40.00 Wage Garnishment
64832 Parker Hannifin Corporation 756.71 Mechanical Parts&Supplies
64833 Court Order 296.00 Wage Garnishment
64834 Peace Officers Council of CA 1,584.00 Dues Deduction
64835 PenValve 18.99 Plumbing Parts&Supplies
64836 Primary Source Office Furnishings,Inc. 1,207.88 Office Supplies
64837 Pumping Solutions,Inc. 413.28 Pump
64838 Sancon Engineering,Inc. 15,545.00 Construction-Manhole Rehabilitation Program
64839 Santa Ana River Flood Protection Agency 1,400.00 Membership
64840 Smardan Supply Company 65.35 Plumbing Supplies
64841 Court Order 721.50 Wage Garnishment
64842 Southern Counties Lubricants 2,489.03 Hydraulic Oil
64843 Sparktetts 1,368.99 Drinking Water/Cooler Rentals
64844 Spex Certiprep,Inc. 1,092.17 Lab Supplies
64845 SBC 975.18 Telephone Services
64846 SKC-West,Inc. 1,255.29 Lab Parts&Supplies
64847 SPX Valves&Control 3,378.19 Valves
64848 Rand McNally Map&Travel Store 9,923.78 GIS Database&Map Viewer Software
64849 Thompson Industrial Supply,Inc. 2,441.61 Mechanical Supplies
64850 United Parcel Service 1,058.11 Parcel Services
64851 United Way 245.00 Employee Contributions
64852 US Equipment Co.,Inc. 1,082.04 Air Compressor
64853 Verizon 61.29 Telephone Service
64854 Verizon California 356.10 Telephone Services
64855 Sonja A.Wassgren 210.00 Meeting/Training Expense Reimbursement
64856 Wastewater Technology Trainers 350.00 Training Registration
64857 Western Tech Service Company 1,633.80 Chemicals&Detergents
64858 WEF 278.00 Membership-Water Environment Federation
64859 Court Order 597.50 Wage Garnishment
64860 Marc A.Brown 420.48 Meeting/Training Expense Reimbursement
64861 James L.Burror 131.00 Meeting/Training Expense Reimbursement
64862 Deirdre E.Hunter 365.40 MeetinglTraining Expense Reimbursement
64863 Michael D.Moore 220.00 Meeting/training Expense Reimbursement
64864 Adam A.Nazaroff 105.35 MeetinglTraining Expense Reimbursement
64865 Quynh D.Nguyen 512.75 MeetinglTraining Expense Reimbursement
64866 Fred J.O'Brien 889.07 Meeting/Training Expense Reimbursement
64867 Doug Rulison 210.30 Meeting/Training Expense Reimbursement
64868 Richard E.Schlegel,Jr. 751.43 Meeting/Training Expense Reimbursement
64869 Ann Tobin 131.00 Meeting/Training Expense Reimbursement
64870 Edward M.Torres 367.12 Meeting/Training Expense Reimbursement
64871 Charles F.Winsor 527.59 Meeting/Training Expense Reimbursement
64872 California Dept.of Fish and Game 127.25 Permit Fee-Stream/Lake Alteration Agrmt.for Malnt.Access to Santa Ana River Bed
64873 ADS Environmental Services,Inc. 47,917.50 Professional Services J-73-2
64874 AKM Consulting Engineers 25,297.31 Professional Services 7-39
64875 Black&Veatch Corporation 644,835.33 Engineering Services P1-76,J-71-3,P1-102&J-77
64876 BMC:Business Machines Consultants,Inc. 36,462.71 (1)Multifunctional Copier&Stapler/Stacker,Software,Supplies&Toner
64877 Carollo Engineers 463.422.37 Professional Services P2-66
64878 CH2MHill 49,737.82 Engineering Services J-40-7
H:IdeptUlnl2101CRANEIFAHRIFAHR2004lSEPTICIafms Paid Report-091504.xis EXHIBIT A
fln121011c Page 2 of 9 9/28/2004
Claims Paid From 09/01/04 to 09/15104
Warrant No. Vendor Amount Description
64879 GHD,L.L.C. 58.155.00 Professional Services-Asset Management Program
64880 IPMC Go Parsons 882,034.00 Professional Services-Integrated Program Management
64881 Kaiser Foundation Health Plan 58.840.96 Medical Insurance Premium
64882 Kemiron Companies,Inc. 98,020.32 Ferric Chloride MO 9-27-95
64883 Lee&Ro,Inc. 60.864.74 Professional Services P2-47-3&5-52
64884 MWH Americas,Inc. 125,530.59 Professional Services P2-74
64885 NWRI National Water Research Institute 50,000.00 Membership
64886 Parsons Water&Infrastructure,Inc. 29,413.45 Professional Services J-35-1
64887 Pioneer Americas,Inc. 77,940.59 Sodium Hypochlorite
64888 Polydyne,Inc. 53,781.05 Cationlc Polymer MO 3-11-92
64889 SPEC Services,Inc. 72,525.96 Engineering Services J-83&J-33-1
64890 Tetra Tech,Inc. 48,654.15 Professional Services 7-37
64891 Tule Ranch/Magan Farms 159,569.71 Residuals Removal MO 3-29-95
64892 U.S.Peroxide,L.L.C. 67,121.54 Odor&Corrosion Control Treatment for Coll.Sys.;Hydrogen Peroxide&Ferrous Chloride
64893 Mike PrIlch&Sons 118,110.59 Construction 6-13-3
64894 Steve P.Rados,Inc. 447,028.20 Construction 1-2-4
64895 Union Bank of California 49,669.80 Construction 1-2-4,Retention
64896 Abrasive Engineering Tool&Equip. 25.78 Repair&Maintenance Material
64897 Acoustical Material Services 805.29 Ceiling Tile
64898 Adamson Industries 1,547.72 Lab Parts&Supplies
64899 Airco Filter Service 89.41 Oil Filters
64900 Airgas Safety,Inc. 411.39 Safety Supplies
64901 American Fildelity Assurance Company 38.50 Employee Cancer Insurance
64902 American Machinery&Blade,Inc. 136.44 Saw Blades
64903 Analytical Products Group,Inc. 695.00 Lab Parts&Supplies
64904 Appliance Specialists 75.00 Dishwasher Repairs-Board Room Kitchen
64905 Ashbrook Corporation 2,241.36 Mechanical Parts&Supplies
64906 Aspen Publishers,Inc. 252.30 Subscription
64907 Piers Clark-Atkins Water 2,320.00 Engineering/Lab Testing-Anaerobic Baffled Reactor Pilot Plant
64908 Awards&Trophies Company 28.61 Plaques&Awards
64909 ACS Hydraulics,Inc. 794.62 Motor Repairs
64910 AT&T Universal Biller 5,791.67 Telephone Service
64911 AWSI 133.00 Department of Transportation Program Management&Testing
64912 Baker Tanks 13,005.00 Tank Rentals
64913 Bar Tech Telecom,Incorporated 6,683.93 Telephone Equipment Maint.&Service
64914 Barco Products Company 95.40 Parking Lot Safety Equipment,Supplies&Hardware
64915 Basic Chemical Solutions,L.L.C. 12,105.33 Sodium Blsulfte&Sodium Hydroxide
64916 BioMerieux Vilek,Inc. 1,079.00 Lab Supplies
64917 Boise Workspace 2.197.27 Modifications to Workstations-Environmental Compliance&Monitoring Div.
64918 Brinderson 404.00 Professional Services P2-79
64919 BEC-Building Electronic Controls,Inc. 303.32 Fire Alarm System Maintenance,Repair&Quarterly Inspection
64920 California Hazardous Services,Inc. 4,050.00 Filter&Transfer Diesel Fuel from Baker Tanks to UST
64921 Cambridge Isotope Labs 1,109.03 Lab Parts&Supplies
64922 Cameron Welding Supply 72.19 Welding Supplies
64923 Carl Warren&Co. 299.01 Insurance Claims Administrator
64924 Casual Gourmet 117.72 Meeting Expenses
64925 Cingular Wireless Equipment 36.19 Equipment&Tax on Free Phones
64926 Cole-Parmer Instrument Co. 455.81 Tubing
64927 Columbia Analytical Services,Inc. 870.00 Analyses of Wastewater,Industrial Wastewater&Biosolids
H:Weptlfin12104CRANEIFAHRIFAHR2004%SEPTIClatms Pald Report-091504.xis EXHIBIT A
finr2101tc Page 3 of 9 9/2812004
Claims Paid From 09/01/04 to 09/15/04
Warrant No. Vendor Amount Description
64928 Consumers Pipe&Supply Co. 1,357.60 Plumbing Supplies
64929 Coolant Management Services 742.21 Drilling&Cutting Fluid
64930 Cooper Cameron Corporation 379.80 Engine Supplies
64931 Corporate Express 2,809.56 Office Supplies
64932 County Wholesale Electric Co. 189.73 Electrical Parts&Supplies
64933 Cummins Cal Pacific,Inc. 1.907.15 Industrial Tank Heater
64934 California Special Districts Association 275.00 Training Registration
64935 Daniel Environmental,L.L.C. 8,620.00 Installation of Zero Leakage Damper
64936 Dapper Tire Co. 213.12 Truck Tires
64937 David's Tree Service 14,040.00 Tree Maint.Service
64938 Del Mar Analytical 1,994.00 Analysis of Biosolids and Wastewater
64939 Dharma Consulting 15,725.00 Professional Services-Strategic Planning&EMT Development
64940 Dionex Corporation 343.54 Lab Parts&Supplies
64941 Dunn-Edwards Corporation 145.95 Paint Supplies
64942 DLT Solutions,Inc. 7,012.37 Map Subscription&Web Support
64943 Eagle Aerial Imaging 9,394.25 Aerials on DVD&Software License
64944 Enchanter,Inc. 3,600.00 Ocean Monitoring&Outfall Inspection&Maintenance
64945 Environmental Engineering&Contracting 8,000.00 Prof.Serv.-Industrial Wastewater Operator Training&Follow-Up Audits
64946 Equapac 1,800.49 Hydrochloric Acid
64947 Fisher Scientific Company,L.L.C. 4,486.49 Lab Parts&Supplies
64948 Flo-Systems,Inc. 2,419.22 Pump Supplies
64949 Foodcraft Coffee&Refreshment Services 260.62 Meeting Supplies
64950 Fortis Benefits Insurance Company 24,919.59 Long-Term&Short-Tenn Disability Ins.Premium
64951 Fountain Valley Paints,Inc. 90.78 Paint Supplies
64952 Franklin Covey 668.86 Office Supplies
64953 G.E.Supply 1,022.15 Drip Proof Motor
64954 Ganahl Lumber Company 326.49 Lumber/Hardware
64955 Garratt-Callahan Company 294.16 Chemicals
64956 Giedich-Mitchell,Inc. 1,268.17 Pump Parts&Supplies
64957 Grainger,Inc. 633.81 Mechanical Parts,Supplies&Tools
64958 Great Western Sanitary Supplies 53.01 Janitorial Supplies
64959 Hach c/o Penton Industries 2,253.83 Lab&Inst.Parts&Supplies
64960 Harold Primrose Ice 74.00 Ice For Samples
64961 Harrington Industrial Plastics,Inc. 4,491.68 Plumbing Supplies
64962 High Impact Priority Training 510.00 On-Site Forklift Training
64963 Hill Brothers 20,064.02 Chemicals-Odor&Corrosion Control-Newport Trunkline
64964 History Associates,Inc. 4.887.34 Professional Services-Study of Records,Photographic Materials&Reports
64965 Hoerbiger Service,Inc. 222.01 Compressor Parts
64966 Home Depot 199.79 Misc.Repair&Maintenance Material
64967 Hub Auto Supply 516.33 Vehicle Parts&Supplies
64968 HDR Engineering,Inc. 6,025.61 Construction P2-82
64969 1.D.Industries,Inc. 102.00 Mechanical Parts&Supplies
64970 Industrial Distribution Group 1,558.04 Tools
64971 Industrial Threaded Products,Inc. 3,160.93 Fasteners
64972 Irvine Ranch Water District 3.90 Water Use
64973 ISA 2,520.00 Ins.&Elec.Maint.Div.Meeting Registration(Intn'I.Assoc.for Meas.&Control)
64974 ISEC,Inc. 4,045.00 Lab Parts&Supplies
64975 J&L Industrial Supply 517.20 Tools
64976 Jay's Catering 156.29 Meeting Expenses
H:ldepllM121(1CRANEIFAHRIFAHR20041SEPnClaims Paid Report-091504.)ds EXHIBIT A
fin1210nc Page 4 of 9 928/2004
y �
Claims Paid From 09101/04 to 09115104
Warrant No. Vendor Amount Description
64977 John Bell Pool Service 310.00 Maintenance Services-Admin Bldg.Atrium Pond
64978 JWC Environmental 9,897.92 Upgrade Muffin Monster Grinder for Digester No.11
64979 Karcher Insulation,Inc. 378.48 Repair Boiler Insulation On Boiler No.2
64980 Kent Fluid Power Div.of AIT 102.55 Electrical Parts&Supplies
64981 Lab Safety Supply,Inc. 57.59 Lab Parts&Supplies
64982 La Motte Chemical Products 96.88 Lab Parts&Supplies
64983 Maintenance Technology Corp. 516.90 Mechanical Supplies
64984 Managed Health Network 950.94 Employees Assistance Program
64985 McJunkin Corporation 9,417.36 Mechanical Parts&Supplies
64986 McKenna Engineering&Equipment Co. 2,354.71 Mechanical Parts&Supplies
64987 McMaster-Carr Supply Co. 694.93 Mechanical Parts,Supplies&Tools
64988 Megger 1,165.23 Software
64989 Milltronics,Inc. 4,185.73 Electrical Supplies
64990 Mitchell Instrument Co. 335.71 Instrument Parts&Supplies
64991 MARMAC Field Services,Inc. 14,911.00 Professional Services P1-92
64992 National Plant Services,Inc. 440.00 Vacuum Truck Services
64993 Neal Supply Co. 5.50 Plumbing Supplies
64994 Ninyo&Moore Corporate Accounting 17.340.89 Professional Services-Materials Testing,Inspection&Geotechnical Engrg.
64995 The Norco Companies 180.48 Mail Delivery Service
64996 Oxygen Service Company 2,502.92 Specialty Gases
64997 OCB Reprographics 3,869.92 Printing Service-MO 1/26/00
64998 P.L.Hawn Company,Inc. 3,303.97 Electrical Supplies
64999 Pacific Blue Micro 9,854.27 CISCO Software Upgrade,SMARTNET Warranty&Phone Support
65000 Pacific Mechanical Supply 794.28 Plumbing Supplies
65001 PaintJob.00m 2,975.00 Paint Supplies
65002 Parker Supply Company 2,584.04 Mechanical Parts&Supplies
65003 Parkhouse Tire,Inc. 355.11 Tires
65004 Paul Pitt 5,054.43 Professional Services SP-74
65005 Peerless Wiping Materials Co. 560.30 Janitorial Supplies
65006 Perma Pure,Inc. 382.84 Filter
65007 Pre-Paid Legal Services,Inc. 433.55 Employee Legal Service Insurance Premium
65008 Primary Source Office Furnishings,Inc. 3,622.07 Office Furniture-Cubicle Panels
65009 Profit Techniques,Inc. 1,562.50 Professional Services-O&M Manager Coaching
65010 PCG Industries 3.175.00 Repair&Maintenance Service-Machine&Metal Spray Work
65011 PCS Express Inc. 122.00 Courier Service
65012 QAir California-Div.Pump Engineering 243.64 Filters
65013 Quinn Power System Assoc. 233.65 Hose
65014 R&R Instrumentation,Inc. 290.69 Instrument Supplies
65015 Red Valve Company,Inc. 653.63 Mechanical Supplies
65016 Reliastar 9,993.60 Employee Basic Life&Managers'Insurance Premiums
65017 Ricoh Business System 1,623.90 Color Copier Lease
65018 Rite In The Rain 236.71 Lab Parts&Supplies
65019 Rotork Controls,Inc. 2,542.62 Motor Valve
65020 RBF Engineers 18,353.63 Engineering Services 2-24-1,7-22-1 &7-38
65021 Safety Center,Inc. 600.00 Training Registration
65022 Sartorius Corporation 198.00 Lab Equipment Service
65023 Schwing America.Inc. 2,362.57 Pump Supplies
65024 Scottel Voice&Data Inc. 2,284.80 Telephone System Maintenance
65025 Seaventures 5,550.00 Ocean Monitoring Vessel
H:ldept\Pn\2101CRANE\FAHRTAHR20041SEPT\Claims Paid Report-091504.xls EXHIBIT A
firdMflc Page 5 of 9 9/2812004
Claims Paid From 09/01/04 to 09/15/04
Warrant No. Vendor Amount Description
65026 Shamrock Supply Co.,Inc. 1.502.97 Janitorial Supplies
65027 Shortridge Instruments,Inc. 59.41 Instrument Parts&Supplies
65028 Shureluck Sales&Engineering 1,136.93 Mechanical Parts&Supplies
65029 Sigma-Aldrich,Inc. 677.59 Lab Parts&Supplies
65030 Smardan Supply Company-Fountain Valley 23.11 Plumbing Supplies
65031 Smith Pipe&Supply 54.44 Mechanical Parts&Supplies
65032 Southern California Water 78.79 Water Use
65033 Southern Counties Lubricants 2,678.67 Engine Oil
65034 Sperling Instruments,Inc. 4,202.42 Flow Meter
65035 Specialized Environmental,Inc. 11,682.00 Construction 7-23-1
65036 Stanley Steamer International,Inc. 351.45 Carpet Cleaning Services
65037 Summit Steel 1,284.63 Metal
65038 Sunset Industrial Parts 605.78 Mechanical Supplies
65039 Super Power Products 775.80 Janitorial Supplies
65040 SBC 6,169.00 Telephone Services
65041 SCWMF 80.00 Meeting Registration-Environmental Compliance&Monitoring
65042 SPX Valves&Control 4,322.18 Valves
65043 Teletrac,Inc. 245.00 Monthly Air-Time Service Fee&Software/Hardware Maint.for Vehicle Tracking Sys.
65044 The Walking Man,Inc. 525.00 Public Notice Printing/Distribution-7-23-1
65045 Thomas V.Gerlinger 500.00 Lab Analyses
65046 Thompson Industrial Supply,Inc. 5,013.35 Mechanical Parts&Supplies
65047 Traffic Control Service,Inc. 283.38 Traffic Safety Equipment Rental
65048 Transcat 462.44 Electrical Supplies
65049 Tri-State Seminar On-the-River 360.00 O&M Meeting Registration
65050 Tropical Plaza Nursery,Inc. 3,635.00 Contract Groundskeeping MO 5-11-94
65051 Truck&Auto Supply,Inc. 23.08 Automotive Supplies
65052 TMV Systems Engineering,Inc. 13,781.25 Software Programming Services
65053 United States Postal Service 5.000.00 Postage
65054 Univar USA 653.42 Chlorine
65055 Urban Alternatives 7,636.00 Professional Services-Community Relations&Coaching Support
65056 UC Regents 295.00 Training Registration
65057 Varian Associates,Inc. 818.29 MS Workstation Upgrade
65058 Verizon California 792.95 Telephone Services
65059 Vision Service Plan-(CA) 9,507.60 Vision Service Premium
65060 Vossler&Company 196.35 Mechanical Supplies
65061 VWR Scientific Products Corporation 5,400.97 Lab Parts&Supplies
65062 The Wackenhut Corporation 5,761.59 Security Guards
65063 Waxie Sanitary Supply 148.73 Janitorial Supplies
65064 West-Lite Supply Company,Inc. 553.84 Electrical Supplies
65065 Weston Solutions,Inc. 12,600.00 Lab Analyses of Benthic Infaunal for Permit Required for Core Ocean Monitoring Program
65066 Xerox Corporation 44.77 Copier Leases
65067 Patrick B.Carnahan 645.41 Meeting/Training Expense Reimbursement
65068 Terry W.Krie 156.88 Meeting/Training Expense Reimbursement
65069 Deborah L.Lindel 549.90 Meeting/Training Expense Reimbursement
65070 Umesh N.Murthy 150.00 Meeting/Training Expense Reimbursement
65071 Edward M.Torres 532.89 Meeting/Training Expense Reimbursement
65072 David A.Usher 46.00 MeetingrTraining Expense Reimbursement
65073 CWEA-SARBS,Inc. 1,350.00 Training Registration
65074 Kavlokis,John 2.327.31 Employee Computer Loan Program
H:ldeptUn1210lCRANEIFAHRIFAHR20041SEP"RClaims Paid Report-091504.4s EXHIBIT A
finl210nc Page 6 of 9 9128r2oo4
1 I
Claims Paid From 09101/04 to 09/15/04
Warrant No. Vendor Amount Description
65075 Orange County Sanitation District 952.26 Petty Cash Reimb.
65076 ARCS Foundation,Inc. 1,400.00 Technical Services&General Mgml.Admin.Meeting Registration
65077 HDR Engineering,Inc. 560.00 Professional Services SP-74
65078 American Express 47.879.03 Purchasing Card Program,Misc.Supplies&Services
65079 Dell Marketing,L.P. 29,724.72 (25)Desktop Computers
65080 Delta Dental 55,844.35 Dental Insurance Plan
65081 Orange County Water District 14,765,933.10 Joint GWRS Project J-36
65082 UBS Financial Services,Inc. 37,716.39 Remarketing Fee-Series 2000 A&B Refunding Certificates of Participation
65083 Orange County Sanitation District 25,096.26 Worker's Comp.Reimb.
65084 Ac roburr,Inc.#2 219.78 Reconciliation User Fee Refund Program
65085 Air Industries Corporation 1,444.14 Reconciliation User Fee Refund Program
65086 Airgas Safety,Inc. 5,939.58 Safety Supplies
65087 Amerimax Building Products,Inc. 3,598.93 Reconciliation User Fee Refund Program
65088 Anaheim Extrusion Co.,Inc. 6,034.82 Reconciliation User Fee Refund Program
65089 Anaheim General Hospital 11,610.65 Reconciliation User Fee Refund Program
65090 Aurora Pictures,Inc. 674,00 Safety Training Materials-Video
65091 APW Enclosure Systems 16,591.39 Reconciliation User Fee Refund Program
65092 APW Enclosure Systems,L.L.C. 5,985.15 Reconciliation User Fee Refund Program
65093 ARO Services 1,083.09 Reconciliation User Fee Refund Program
65094 American Telephone&Telegraph Corp. 184.78 Telephone Service
65095 Bruce A.Chapman 56.00 Meeting/Training Expense Reimbursement
65096 Circuit Tech,Inc. 299.79 Reconciliation User Fee Refund Program
65097 City of Brea-Water Division 1,002.00 Reconciliation User Fee Refund Program
65098 City of Stanton 1,212.00 Reconciliation User Fee Refund Program
65099 City of Yorba Linda 487.60 Reconciliation User Fee Refund Program
65100 Court Order 150.00 Wage Garnishment
65101 Consolidated Elect.Distributors,Inc. 703.37 Electrical Supplies
65102 Consumers Pipe&Supply Co. 535.97 Plumbing Supplies
65103 County of Orange 182.14 Wage Garnishment
65104 Court Trustee 69.12 Wage Garnishment
65105 Cytec Industries,Inc. 240.54 Anionic Polymer Spec.No.9798-18
65106 Department of Child Support Services 188.50 Wage Garnishment
65107 Don Wolf&Associates,Inc. 12.176.02 Instrument-Emissions Analyzer
65108 Edwards Lifescience,L.L.C. 6,092.75 Reconciliation User Fee Refund Program
65109 Employee Benefits Specialists,Inc. 9,773.15 Reimbursed Prepaid Employee Medical&Dependent Care
65110 Employers Group 7,400.00 Employee Assistance Program
65111 Court Order 445.00 Wage Garnishment
65112 Exxon Mobil Corp.#18-G6R 26.64 Reconciliation User Fee Refund Program
65113 FedEx Corporation 190.88 Freight Services
65114 Fisher Scientific Company,L.L.C. 862.43 Lab Supplies
65115 Fitch,Inc. 3,000.00 Annual Surveillance Fee for Series 2000 A&B Certificates of Participation
65116 Franchise Tax Board 50.00 Wage Garnishment
65117 Fry's Electronics 59.24 Computer Supplies
65118 City of Fullerton 1,025.00 Water Use
65119 Gayle Balazs 114.00 Claim Settlement
65120 Graphic Packaging Corp 255.37 Reconciliation User Fee Refund Program
65121 Hagemeyer North America 3,486.12 Prescription Safety Glasses
65122 Deirdre E.Hunter 201.11 Registration
65123 Industrial Threaded Products,Inc. 21.17 Fasteners
H:\depllfn\210%CRANE\FAHRIFAHR20041SEPT\Claims Pa!d Report-091504.x!s EXHIBIT A
Bn1210!!c Page 7 of 9 M812004
Claims Paid From 09101/04 to 09/15/04
Warrant No. Vendor Amount Description
65124 Internal Revenue Service 300.00 Wage Garnishment
65125 Internal Revenue Service 200.00 Wage Garnishment
65126 Intl.Union of Oper.Eng AFL-CIO Local 501 3,888.98 Dues Deduction
65127 J&B Auto Parts 125.90 Auto Parts&Supplies
65128 James'Tex"Climie 1,170.00 Marine Consulting-Ocean Monitoring Vessel Construction Inspection
65129 K.P.Lindstrom,Inc. 4,847.00 Environmental Consulting Services MO 12-9-90
65130 Mac&Associates,An Industrial Dist.Co 1,211.16 Check Valve
65131 Material Damage Appraisal of Long Beach 135.38 Vehicle Damage Appraisal
65132 McMaster-Carr Supply Co. 2,896.60 Mechanical Parts&Supplies
65133 Mission Uniform Service 4,854.42 Uniform Rentals
65134 Morgan,Kathlynn Frances Dees 225.00 Wage Garnishment
65135 National Bond&Trust 2,485.36 U.S.Savings Bonds Payroll Deductions
65136 Nextel Communications 1,413.45 Cellular Phones&Air Time
65137 Nu-Way Laser Engraving 913.54 Steel Tags
65138 The Orange County Register 6,374.20 Notices&Ads
65139 Orange Fluid System Technologies,Inc. 527.18 Plumbing Parts&Supplies
65140 OCEA 589.36 Dues Deduction
65141 Court Order 40.00 Wage Garnishment
65142 Court Order 296.00 Wage Garnishment
65143 Peace Officers Council of CA 1,584.00 Dues Deduction
65144 PenValve 46.42 Plumbing Parts&Supplies
65145 Restek Corp 200.00 Training Registration
65146 Sanmina Corp. 140.90 Reconciliation User Fee Refund Program
65147 Shureluck Sales&Engineering 19.28 Mechanical Parts&Supplies
65148 Smardan Supply Company 682.70 Plumbing Parts&Supplies
65149 Smith Pipe&Supply,Inc. 91.80 Plumbing Supplies
65150 Smith-Emery Company 6,063.53 Professional Services J-77,7-23-1,6-13-1 &P1-76
65151 Court Order 721.50 Wage Garnishment
65152 So.Cal.Gas Company 24,277.55 Natural Gas
65153 Southern California Edison 9,171.71 Power
65154 Southern Mgr Grp,Inc.c/o O'Connor 5,882.67 Valves
65155 Summit Steel 289.58 Metal
65156 Sunset Industrial Parts 99.13 Mechanical Parts&Supplies
65157 SBC 16.95 Telephone Services
65158 Thermo Electron Corp. 205.00 Training Registration
65159 Thompson Industrial Supply,Inc. 109.23 Mechanical Supplies
65160 Tilson&Associates,L.L.C. 3,000.00 Training Registration
65161 Times Community News 93.75 Notices&Ads
65162 Truck&Auto Supply,Inc. 53.34 Automotive Supplies
65163 The Unisource Corporation 153.17 Office Supplies
65164 United Parcel Service 32.00 Parcel Services
65165 United Way 245.00 Employee Contributions
65166 Universal Circuits,Inc. 2,149.28 Pest Control
65167 Varian Associates,Inc. 25.90 MS Workstation Upgrade
65168 Verizon California 2,5B4.31 Telephone Services
65169 VWR Scientific Products Corporation 11,464.29 Lab Parts&Supplies
65170 The Wackenhut Corporation 5,407.11 Security Guards
65171 Weston Solutions,Inc. 18.740.00 Lab Analyses of Benthic Infaunal
65172 Court Order 597.50 Wage Garnishment
H:\deptlfin12101CRANEIFAHRTAHR20041SEPT\Claims Paid Report-091504.xts EXHIBIT A
fin/210Ac Page 8 of 9 9/28/2004
Z 4
Claims Paid From 09101104 to 09/15104
Warrant No. Vendor Amount Description
65173 Yorba Linda Water District 3,913.28 Reconciliation User Fee Refund Program
65174 Fred J.O'Brien 906.82 Meetingfrraining Expense Reimbursement
65175 GeomAtrix Consultants,Inc. 1.386.98 Legal Services 1-2-4
65176 Kienow,Associates,Inc. 14,029.01 Legal Services 1-2-4
65177 Paul Freeman 1,092.77 Claim Settlement
Total Accounts Payable-Warrants $ 19,690,030.42
Payroll Disbursements
34717-34809 Employee Paychecks $ 142,626.85 Biweekly Payroll 09/01/04
34810-34810 Employee Paycheck 300.00 Returned Direct Deposit-Closed Account
34811-34917 Employee Paychecks 148,762.17 Biweekly Payroll 09/15/04
34918-34919 Employee Paychecks 437.89 Adjustments
101913-102441 Direct Deposit Statements 985,394.33 Biweekly Payroll 09/01/04
102442-102976 Direct Deposit Statements 1,045,277.95 Biweekly Payroll 09115/04
Total Payroll Disbursements $ 2,322,799.19
Wire Transfer Payments
OCSD Payroll Taxes&Contributions $ 723,532.24 Biweekly Payroll 09/01/04
OCSD Payroll Taxes&Contributions 747,562.28 Biweekly Payroll 09/15/04
JP Morgan Chase Bank 39,544.07 August Interest Payment on Series 1993 Certificates of Participation
JP Morgan Chase Bank 119,968.88 Societe Generale August Swap Payment on 1993 Series Certificates of Participation
Total Wire Transfer Payments $ 1,630,607.47
Total Claims Paid 09/01104-09115/04 $ 23,643,437.08
H:Ideptlfinl2101CRANETAHRTAHR2004ZEP'nClafms Paid Report-091504AS EXHIBIT A
fin121011c Page 9 of 9 9128/2004
Claims Paid From 09/16/04 to 09130/04
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
65178 ADS Environmental Services,Inc. $ 57,908.70 Professional Services-J-73-2
65179 Basic Chemical Solutions,L.L.C. 29.163.45 Sodium Bisulfite&Sodium Hydroxide
65180 Blue Cross of California 321,589.45 Medical Insurance Premium
65181 Brown&Caldwell 70,500.43 Professional Services-P1-37,P2-41 &0&M Standards&Procedures Manual
65182 Camp Dresser&McKee,Inc. 107,893.39 Engineering Services J-71-8
65183 Carollo Engineers 30,352.01 Professional Services-Coordinated Commercial Enterprise Study&P2-60
65184 Voided Check - -
65185 Computational Systems,Inc. 47,653.52 (2)Machinery Vibration Analyzers&Speed Vue Lasers for Speed Sensor Kit
65186 Environmental Engineering&Contracting 117,103.15 Professional Services-Fats,Oil&Grease(FOG)Study
65187 Irvine Technology Corporation 28,228.00 Temporary Employment Services
65188 J R Filanc Construction 74,047.05 Repair&Maint.Services-Replace Packing for Scrubbers 5,6,8&D1,D2&D3
65189 JPL Compressor Service,Inc. 188,082.72 Replace Camshaft/Lobes-Engine No.2,Plt. 1 Cen Gen;&Overhaul Engine No.2,Plt.2
65190 Kemiron Companies,Inc. 90,954.83 Ferric Chloride MO 9-27-95
65191 Malcolm Pimie,Inc. 255,478.89 Professional Services J-79&P2-80
65192 Moreland&Associates 29,903.75 Auditing Services
65193 Pioneer Americas,Inc. 370,135.54 Sodium Hypochlorite
65194 Primary Source Office Furnishings,Inc. 26,294.08 Office Furniture&Accessories
65195 Sancon Engineering,Inc. 95,470.60 Construction-Manhole Rehabilitation Program
65196 South Coast Air Quality Management Dist. 33,901.37 Annual Emission,Operation&Misc.Fees
65197 Southern California Edison 142,576.68 Power
65198 Tule Ranch/Magan Farms 333,551.60 Residuals Removal MO 3-29-95
65199 Turblex,Inc. 62,689.99 Repair&Maint.Services-Turblex Blower
65200 Teksystems 31,879.00 Temporary Employment Services
65201 U.S.Peroxide,L.L.C. 162,889.93 Odor&Corrosion Control Treatment for Coll.Sys.;Hydrogen Peroxide&Ferrous Chloride
65202 The Vantage Group,L.L.C. 25,720.00 Temporary Employment Service
65203 Woodruff,Spradlin&Smart 195,872.48 Legal Services MO 7-26-95
65204 ARB,Inc. 646,772.37 Construction 7-41 &7-39
65205 J F Shea Construction,Inc. 1,454,938.38 Construction J-35-1,J-77&J-71-3
65206 J R Filanc Construction 1,442,818.80 Construction P1-76
65207 Margate Construction,Inc. 1,328,154.49 Construction P1-37&J-67
65208 Morrow-Meadows Corp 423,654.00 Construction P2-47-3
65209 Olsson Construction,Inc. 195,585.00 Construction P2-82
65210 Paulus Engineering,Inc. 35,799.73 Construction 5-22-R1
65211 Southern Contracting Company 26,564.00 Construction J-33-IA
65212 Torrey Pines Bank 160,313.20 Construction P1-76,Retention
65213 Union Bank of California 71,863.45 Construction 7-36,Retention
65214 Ablaze Group,Inc. 7,250.00 On-Site Training-Crystal Reports
65215 Adams Services,Inc. 3,300.00 Repair&Maint.Services-Pump Out/Clean Baker Tanks
65216 Adamson Industries 515.91 Lab Parts&Supplies
65217 Advance Business Graphics 266.45 Printing Service-Business Cards
65218 Advanced Engine Technology Corporation 1,363.25 Prof.Serv.-Prepare Documentation for PEMS Recertification
65219 Agilent Technologies,Inc. 544.68 Lab Parts&Supplies
65220 Air Liquide America Corp. 420.55 Specialty Gases
65221 Airgas Safety,Inc. 5,070.40 Safety Supplies
65222 Alfa-Laval,Inc. 228.10 Electrical Parts&Supplies
65223 Alhambra Foundry Co.,Ltd. 4,808.34 Manhole Frames&Covers
65224 Allen Instruments&Supplies 102.36 Instrument Parts&Supplies
65225 Alta-Robbins,Inc. 52.66 Instrument Supplies
H:\dept\fin12101CRANE\FAHR1FAHR2004\OCTOBER\Claims Patd Report•093004.xls EXHIBIT B
fN21011c Page 1 of 8 10118A'004
y • w
Claims Paid From 09/16/04 to 09/30/04
Warrant No. Vendor Amount Description
65226 American Airlines 2,244.30 Travel Services
65227 American Fisheries Society 68.00 Publication
65228 American Red Cross 12.00 CPR Training&Miscellaneous Supplies
65229 Analysts,Inc. 299.16 Testing Kits&Analyses
65230 Aquatic Bioassay And Consulting Lab 750.00 Whole Effluent Toxicity Testing
65231 Arizona Instrument 883.00 Instrument Repairs
65232 AssurX,Inc. 5,513.00 CATWEB Software Upgrades&Support
65233 ABB Automation,Inc. 2,002.47 Instrument Service Maint.-Controller Board
65234 ABB Automation,Inc. 383.05 Instrument Calibration Service
65235 ARB/PERP-Air Resources Board 180.00 Permit Fee-Statewide Portable Equipment Registration Program
65236 ASTD-OC-American Society for Training 515.00 Training Registration
65237 American Telephone&Telegraph Corp. 182.23 Telephone Service
65238 AT&T Wireless Services 4,153.64 Wireless Phone Services
65239 Baker Tanks 560.00 Tank Rentals
65240 Bar Tech Telecom,Inc. 1,296.95 Telephone Maint.-16 Port Digital Line Card for Pit.2 PBX System
65241 Basler Electric Company,Department 590 1.637.35 Electrical Supplies
65242 Bell Pipe&Supply Co. 187.29 Piping Supplies
65243 Biocycle 69.00 Publication
65244 Black&Veatch Corporation 1,212.95 Engineering Services P2-85
65245 Boiler and Steam Parts.com 1,138.80 Safety Valves
65246 Bondlcglstix,L.L.C. 2,800.00 Prof.Serv.-Preparation of Interim Arbitrage Rebate Report Series 2003 COPs
65247 Bush&Associates,Inc. 6,680.00 Professional Services J-77,6-13-3&Surveying Services Various
65248 BC Wire Rope&Rigging 279.20 Mechanical Parts,Supplies&Service
65249 BMC:Business Machines Consultants,Inc 104.98 Office Supplies
65250 Caltrol,Inc. 910.59 Electrical Parts&Supplies
65251 Cardlock Fuel Systems,Inc. 16,672.61 Fueling District Vehicles at Local Gas Stations
65252 Carleton Engineers&Consultants,Inc. 1,115.25 Engineering Services-Air Quality
65253 Charles P.Crowley Co. 500.34 Pump Parts&Supplies
65254 City of Tustin 241.85 Water Use
65255 Coast Fire Equipment 383.12 Fire Extinguishers
65256 Cole-Parmer Instrument Co. 277.32 Lab Parts&Supplies
65257 Columbia Analytical Services,Inc. 885.00 Analysis Wastewater,Industrial Wastewater&Biosolids
65258 Compressor Components Of California 18,847.11 Compressor Repair&Maint.Service and Valves
65259 Computer Protection Technology,Inc. 249.78 Computer Maint.Agreement
65260 Computer Sciences Corp. 3,503.70 Consulting&Lab Services-Assay Pilot Project
65261 Consolidated Elect.Distributors,Inc. 5,272.18 Electrical Supplies
65262 Consumers Pipe&Supply Co. 533.60 Plumbing Supplies
65263 Cooper Cameron Corporation 2,385.79 Engine Supplies
65264 Corporate Express 9,741.87 Office Supplies
65265 Corporate Image Maintenance,Inc. 160.00 Custodial Services Spec.No.9899-09
65266 County Wholesale Electric Co. 1,035.76 Electrical Parts&Supplies
65267 Crane Veyor Corp. 1,939.32 Crane Repairs
65268 Culligan of Orange County 40.00 Maint.Agreement-Cen Gen Water Softener System
65269 Cytec Industries,Inc. 18,052.50 Anionic Polymer Spec.No.9798-18
65270 CEM Corporation 386.46 Lab Supplies
65271 CR&R,Inc. 2,237.23 Container Rentals
65272 CWEA Membership 97.00 Membership-Calif.Water Environment Assoc.
65273 David's Tree Service 280.00 Tree Maint.Service
65274 Del Mar Analytical 186.00 Analysis of Biosolids and Wastewater
H:ldeptlfin12101CRANE\FAHRIFAHR2004\OCTOBER1CIa!ms Paid Report-093004.xls EXHIBIT B
fird210Hc Page 2 of 8 10/18/2004
Claims Paid From 09/16/04 to 09/30/04
Warrant No. Vendor Amount Description
65275 Delta Contracting Corp. 6,314.00 Replacement of(13)Door Sets at Pit.2
65276 Dunn-Edwards Corporation 731.77 Paint Supplies
65277 DHL Express(USA),Inc. 13.42 Freight Services
65278 E.Sam Jones Distributors,Inc. 8.62 Electrical Supplies
65279 Easy Frame Sign Company,Inc. 484.88 Printing-Neighborhood Construction Meeting Signs
65280 Elect Air 38.24 Electrical Parts&Supplies
65281 Electra-Bond,Inc. 2,472.87 Repairs&Maintenance Services
65282 Employee Benefits Specialists,Inc. 603.05 Reimbursed Prepaid Employee Medical&Dependent Care
65283 Employers Group 3,600.00 Prof.Serv.-Succession Planning,Career Development&Customize Model Creation
65284 Employers Group 3,890.76 Membership
65285 Employment Development Dept. 5,110.00 State Unemployment Tax
65286 Environmental Control Systems&Products 3,880.00 Chemical/Odor Neutralizer for Cake Handling Facility at Pit.1
65287 Environmental Resource Association 1,527.79 Lab Supplies
65286 Environmental Resource Center 1,448.00 Training Registration
65289 Eqapac 954.10 Hydrochloric Acid
65290 Excel Door&Gate Company,Inc. 890.50 Door Repairs-Grit Bin Roll-Up Door at Pit.2
65291 Excel Partnership,Inc. 895.00 Training Registration
65292 ETI Systems 4,809.08 On-Site Transformer Testing
65293 FedEx Corporation 32.62 Freight Services
65294 Fisher Scientific Company,L.L.C. 13,226.48 Lab Parts&Supplies
65295 Fluor Enterprises,Inc. 3,716.43 Engineering Services J-84&SP-81
65296 Forensic Analytical Specialties 30.00 Asbestos Analyses&Microscopy
65297 Fountain Valley Paints,Inc. 338.84 Paint Supplies
65298 Frasco Profiles 271.00 Human Resources Background Checking
65299 Fred C.Gilbert Co. 136.20 Small Tools
65300 Fuller Truck Accessories 2,066.76 Truck Parts&Supplies
65301 G.E.Supply 24.79 Electrical Parts&Supplies
65302 Ganahl Lumber Company 120.73 Lumber/Hardware
65303 George T.Hall 172.88 Valve&Regulator
65304 Gerhardt's,Inc. 614.30 Instrument Repairs&Maint.Service
65305 Getinge Castle 6.384.42 Lab Parts&Supplies
65306 Gierlich-Mitchell,Inc. 3,229.07 Mechanical Parts&Supplies
65307 Goldenwest Window Service 3.120.00 Window Cleaning Service-Spec.#990015
65308 Grainger,Inc. 2,039.20 Electrical Parts&Supplies
65309 Graybar Electric Company 350.55 Electrical Parts&Supplies
65310 Guarantee Records Management 267.54 Off-Site Records Storage
65311 Hach Go Ponton Industries 777.93 Lab Parts&Supplies
65312 Harold Primrose Ice 74.00 Ice For Samples
65313 Harrington Industrial Plastics,Inc. 90.14 Mechanical Parts&Supplies
65314 Hill Brothers 17.641.85 Chemicals-Odor&Corrosion Control-Newport Trunkline
65315 HIM,Inc. 883.55 Mechanical Parts&Supplies
65316 Hoerbiger Service,Inc. 604.87 Valves
65317 Home Depot 751.06 Misc.Repair&Maintenance Material
65318 Hub Auto Supply 216.65 Vehicle Parts&Supplies
65319 Industrial Distribution Group 1,680.39 Mechanical Parts,Supplies,Tools&Paint
65320 Industrial Metal Supply 33.07 Metal
65321 Information Handling Services 2,495.00 Software Support-NFPA Data Pages
65322 Inorganic Ventures,Inc. 266.75 Lab Parts&Supplies
65323 Insight Investments 3,313.98 Tax Liability
H:\dept\fn\210\CRANE\FAHR\FAHR2004\OCTOBER\Claims Paid Report-093004.xis EXHIBIT B
fN210AC
Page 3 of 8 10/18/,3404
q . .
Claims Paid From 09/16/04 to 09/30/04
Warrant No. Vendor Amount Description
65324 Inleq Group 4,474.82 Professional Services-Contract Management System
65325 Interstate Batteries of Cal Coast 819.87 Batteries for Vehicles&Carts
65326 Irvine Ranch Water District 38.02 Water Use
65327 Isco,Inc. 4,247.25 Rechargeable Batteries&Base Assembly for Sampler
65328 J&B Auto Parts 33.56 Auto Parts&Supplies
65329 J.G.Tucker and Son,Inc. 2,413.60 Specialty Gases
65330 Jaeger Products,Inc. 8,454.58 Dewatering Scrubbers 10'Diameter Packing Support
65331 Jensen Instrument Co. 2,189.27 Instrument Parts&Supplies
65332 Johnson&Associates,L.L.C. 4,500.00 Professional Services-2004 Market Survey
65333 JPMorgan Chase Bank 11,183.00 Yearly Administration Fee for Series 1993 Refunding Certificates of Participation
65334 Kelly Paper 103.41 Paper
65335 Kforce,Inc. 17,836.01 Temporary Employment Services
65336 Lab Support 2,303.25 Temporary Employment Services
65337 LaMotte Company 41.06 Lab Parts&Supplies
65338 Lee&Ro,Inc. 16.595.04 Professional Services P2-47&5-54
65339 Living Leadership 2.457.00 Training Registration
65340 Lucci's Gourmet Foods,Inc. 305.82 Meeting Expense
65341 LC Resources 1,175.00 Training Registration
65342 LINJER 4,996.96 Professional Service-DART MO 9-22-99
65343 Maintenance Technology Corp 142.83 Repair&Maintenance Supplies
65344 Mandic Motors 250.00 Towing Services
65345 Mayer,Brown,Rowe&Maw,L.L.P. 5,000.00 Professional Services-Legislative Advocacy
65346 McCrometer,Inc. 2,633.91 Instrument Parts&Supplies
65347 McMaster-Carr Supply Co. 3,993.23 Mechanical Parts,Tools and Repair&Maintenance Supplies
65348 Medlin Controls Co. 1,765.23 Instrument Supplies
65349 Mesa Laboratories,Inc. 841.00 Repair,Calibrate&Install Heating Unit
65350 Michael Asner Consulting 9,433.74 Professional Services J-40-7
65351 Mission Uniform Service 1,623.01 Uniform Rentals
65352 MJK Construction 16,693.67 Underground Storage Tank Remediation at Blower Building,Pit. 1
65353 National Plant Services,Inc. 3.387.50 Vacuum Truck Services
65354 National Seminars Group 790.00 Training Registration
65355 Neal Supply Co. 81.46 Plumbing Supplies
65356 Ninyo&Moore Corporate Accounting 1,302.00 Professional Services-Materials Testing,Inspection&Geotechnical Engrg.
65357 Nu-Way Laser Engraving 507.65 Steel Tags
65358 NAFA,Inc. 830.00 Membership
65359 NCMA 100.00 Membership
65360 NRDC Publications Department 5.00 Publication
65361 O C Tanner Recognition Company 1,750.32 Employee Service Awards Program
65362 Omnimark Instrument Corp 598.95 Instrument Repairs&Calibration
65363 The Orange County Register 95.94 Notices&Ads
65364 Orange Fluid System Technologies,Inc. 419.98 Plumbing Parts&Supplies
65365 Oxygen Service Company 2,493.28 Specialty Gases
65366 OCB Reprographics 162.11 Printing Service-MO 1/26/00
65367 01 Analytical 614.18 Lab Supplies
65368 P.L.Hawn Company,Inc. 1,508.77 Electrical Supplies
65369 Pacific Bell Internet Services 328.86 Internet Service
65370 Pacific Mechanical Supply 189.64 Plumbing Supplies
65371 Parker Supply Company 3,783.84 Mechanical Parts&Supplies
65372 Parsons,Inc. 23,422.88 Engineering Services J-42
H:ldept\fin12101CRANE\FAHR\FAHR200410CTOBER%Claims Paid Report-093004,xis EXHIBIT B
PrV21011c Page 4 of 8 10118/2004
Claims Paid From 09/16104 to 09130104
Warrant No. Vendor Amount Description
65373 Paul Pitt 4,988.70 Engineering Services SP-74
65374 PenValve 695.28 Plumbing Parts&Supplies
65375 Polydyne,Inc. 23,643.49 Cationic Polymer MO 3-11-92
65376 Power Design 8.490.70 Electrical Supplies
65377 Power Measurement Ltd. 1,616.25 Instrument Repairs&Mafnt.Service
65378 Precon Products 586.17 Concrete
65379 Profit Techniques,Inc. 437.50 Professional Services-O&M Leadership Coaching
65380 Project Management Institute 154.00 Membership
65381 Public Treasury Institute 47.50 Publication
65382 Pulse,Inc. 1,725.82 Computer Hardware/Software
65383 Pumping Solutions,Inc. 4,779.57 Pumps&Pump Supplies
65384 PCG Industries 1,870.00 Repair&Maintenance Services
65385 PVF Sales,Inc. 475.88 Plumbing Parts&Supplies
65386 Q Air-Calif.Div.Pump Engineering 129.71 Pump Supplies
65387 R&R Instrumentation,Inc. 1,456.01 Instrument Supplies
65388 R.L.Abbott&Associates 6,000.00 Kern County Biosolids Consulting Services
65389 Rainbow Disposal Co. 2.816.57 Trash Removal
65390 Reliastar Bankers Security Life Ins. 10,948.69 Employee Life Ins.Premium,Short-Term Disability&Cancer Ins.Payroll Deductions
65391 RemedyTemp,Inc. 1,700.22 Temporary Employment Services
65392 Resource Building Materials 245.27 Cement
65393 Retrofit Parts&Components,Inc. 135.34 Mechanical Parts&Supplies
65394 Rockwell Engineering&Equipment Co. 8,707.14 Pump
65395 Roto Rooter-N.O.C.#11 746.50 CCTV,Inspection&Unclogging of Sewer Laterals
65396 RBF Consulting 18,723.60 Engineering Services 7-40,7-38&7-22-1
65397 RD Instruments 1,424.28 Lab Parts&Supplies
65398 RMS Engineering&Design,Inc. 17,310.00 Engineering Services-2004-05 Facilities Engineering Program
65399 Schwing America,Inc. 2.190.50 Pump Supplies
65400 Science Applications InU. 11,732.45 Professional Services-Support to Deploy Coastal Monitoring Buoy
65401 Seaventures 3.700.00 Ocean Monitoring Vessel
65402 Skalar,Inc. 452.33 Lab Supplies
65403 SkillPath Seminars 189.00 Training Registration
65404 Sloan Electric Company 16,488.78 Motor Repairs
65405 Smardan Supply Company 41.38 Plumbing Parts&Supplies
65406 Smith Pipe&Supply,Inc. 320.20 Plumbing Parts&Supplies
65407 Southern California Edison 34.83 Power
65408 Sparkletts 1,553.39 Drinking Water/Cooler Rentals
65409 Sparling Inst.,Inc. 2,811.62 Flow Meter
65410 Spex Certiprep,Inc. 144.02 Lab Supplies
65411 Summit Steel 2,036.67 Metal
65412 Sunset Ford 11.56 Auto Parts&Service
65413 Sunset Industrial Parts 459.12 Mechanical Supplies
65414 Super Chem Corporation 1,209.55 Chemicals
65415 Technical Service Group,Inc. 1,381.60 SCADA System VAX Service Agreement
65416 SCAP 30.00 Environmental Assessment&Environment Science Lab Divisions Meeting Registration
65417 Teledyne Electronics Tech. 94.99 Instrument Parts&Supplies
65418 Terminix International 3,010.00 Pest Control
65419 Tetra Design,Inc. 16,942.59 Professional Services J-88
65420 Tetra Tech,Inc. 7,423.72 Professional Services 11-22
65421 Thompson Industrial Supply,Inc. 3,433.44 Mechanical Supplies
H:\dept1fn12101CRANEIFAHRIFAHR20041OCTOBER1Clalms Paid Report-093004.xis EXHIBIT B
fiN21011c Page 5 of 8 10/1812J04
Claims Paid From 09/16/04 to 09/30/04
Warrant No. Vendor Amount Description
65422 ThyssenKrupp Elevator Corporation 2,235.50 Elevator Maintenance
65423 Time Motion Tools 167.24 Tools
65424 Tony's Lock&Safe Service&Sales 24.25 Locks&Keys
65425 Townsend Public Affairs 5,000.00 Legislative&Executive Advocate for Grant Funding
65426 Traffic Control Service,Inc. 566.77 Traffic Safety Equipment Rental
65427 Southern California Trane Service 65.36 Electrical Equipment Service Contract
65428 Tri-State Seminar On-the-River 550.00 Training Registration
65429 Tropical Plaza Nursery,Inc. 1,015.00 Contract Groundskeeping MO 5-11-94
65430 Truck&Auto Supply,Inc. 153.94 Automotive Supplies
65431 Tustin Unified School District 3,974.00 Construction-Relocation of Block Wall On OCSD Easement to Allow Manhole Access
65432 Voided Check - -
65433 Union Bank of California 15,365.16 2003 Annual Administrative Fees
65434 United Parcel Service 1.241.91 Parcel Services
65435 US Equipment Co.,Inc. 1,441.60 Filters
65436 Vapex,Inc. 3,221.00 Instrument Parts&Supplies
65437 Varian Associates,Inc. 760.85 Instrument Parts&Supplies
65438 Verizon California 3,734.26 Telephone Services
65439 Veme's Plumbing 475.00 Service Contract-Testing&Cert.Backtiow Devices at Pits.1 &2&Pump Sta.
65440 Vocam USA,L.L.C. 801.48 Video
65441 VWR Scientific Products 2,303.12 Lab Supplies
65442 The Wackenhut Corporation 19,632.10 Security Guards
65443 Water 3 Engineering,Inc. 6,503.88 Engineering Services J-67
65444 Waxie Sanitary Supply 431.77 Janitorial Supplies
65445 Welding Training Solutions,Inc. 5,400.00 Training Registration
65446 West Coast Switchgear,Inc. 12,660.00 Electrical Repair&Maintenance-Vacuum Breakers&Shutters
65447 Western States Control 787.38 Electrical Parts&Supplies
65448 WEF-Registration Dept. 780.00 Training Registration
65449 WEF 531.00 Membership-Water Environment Federation
65450 Xerox Corporation 848.59 Fax&Copier Leases,Supplies,&Maintenance
65451 Yokogawa Corp.of America 425.84 Instrument Parts&Supplies
65452 Zee Medical 457.53 Safety Supplies
65453 California Bank&Trust 2,952.00 Construction J-33-1A,Retention
65454 LH Engineering Co. 14,480.69 Construction 5-54
65455 Orange Community Bank 21,732.00 Construction 132-82,Retention
65456 Paulus Engineering,Inc. 11,743.82 Construction 5-22-Rl
65457 ASTD-OC-American Society for Training 300.00 Training Registration
65458 Dean M.Carrico 56.00 Meeting/Training Expense Reimbursement
65459 James E.Colston 459.55 Meeting/Training Expense Reimbursement
65460 Ingrid G.Hellebrand 1,550.05 Meeting/Training Expense Reimbursement
65461 Deirdre E.Hunter 381.71 Meeting/Training Expense Reimbursement
65462 Penny M.Kyle 150.00 Meeting/Training Expense Reimbursement
65463 Michael D.Moore 166.00 Meeting/fraining Expense Reimbursement
65464 Edmund L.Pendleton 92.00 Meeting/Training Expense Reimbursement
65465 Rory Rea 240.00 Meeting/Training Expense Reimbursement
65466 Roya Sohanaki 150.00 Meeting/Training Expense Reimbursement
65467 Simon L.Watson 147.13 Meeting/Training Expense Reimbursement
65468 Michael I.Zedek 212.90 Meeting/Training Expense Reimbursement
65469 CCAC-City Clerks' Association of CA 200.00 Administrative Services Division Meeting Registration
65470 Orange County Sanitation District 603.09 Petty Cash Reimb.
H:ldeptlfin12101CRANE\FAHR%FAHR200450CTOBER1CIaIms Paid Report-093004.xis EXHIBIT B
fN210ft Page 6 of 8 10118/2004
Claims Paid From 09/16/04 to 09/30/04
Warrant No. Vendor Amount Description
65471 Thompson,Robert 1,124.87 Employee Computer Loan Program
65472 AMSA 29,089.00 Membership(Assoc.of Metropolitan Sewerage Agencies)
65473 City of Fountain Valley 26,506.32 Water Use
65474 MJK Construction 89,659.17 Underground Storage Tank Remediation at Blower Building,Pit.1
65475 Sancon Engineering,Inc. 27,150.00 Construction-Manhole Rehabilitation Program
65476 Synagro Technologies,Inc. 528,549.99 Residuals Removal MO 3-29-95
65477 Waste Markets Corp. 35,035.20 Maint.Agreement-Grit&Screenings Removal&Digester Bed Mat'I.Removal
65476 South Coast Air Quality Management Dist. 61,868.58 Permit Fees-Annual Emission,Operation&Misc.Fees
65479 AccuStandard 50.26 Lab Parts&Supplies
65480 Airgas Safety,Inc. 2,111.56 Safety Supplies
65481 Awards&Trophies Company 52.13 Plaques&Awards
65482 ASTD-OC-American Society for Training 300.00 Training Registration
65483 American Telephone&Telegraph Corp. 91.73 Telephone Service
65484 California Rebuild America Coalition 5,000.00 Membership
65485 Communications Performance Group,Inc. 21,749.82 Prof.Servs.-Emergency Response Plan&Hazardous Energy Control Procedures
65486 Consumers Pipe&Supply Co. 136.53 Plumbing Supplies
65487 County of Orange-Auditor Controller 1,221.00 Encroachment Permit
65488 County of Orange-Auditor Controller 647.50 Encroachment Permit
65489 CA-NV Section,AW WA 450.00 Employee Development/Training Division Meeting Registration
65490 CR&R,Inc. 315.00 Container Rentals
65491 CW EA Membership 194.00 Membership-Calif.Water Environment Assoc.
65492 DAC 5.500.00 Disclosure&Dissemination Services for 1992, 1993,2000 A&B,and 2003 Bond Issues
65493 FedEx Corporation 113.31 Freight Services
65494 Fisher Scientific Company,L.L.C. 2,721.34 Lab Supplies
65495 Franchise Tax Board 50.00 Wage Garnishment
65496 Fry's Electronics 205.23 Computer Supplies
65497 Full Spectrum Analytics 600.00 Instrument Repairs
65498 Hamlet USA,Inc. 266.63 Plumbing Parts&Supplies
65499 City of Huntington Beach 15.285.40 Water Use
65500 Industrial Threaded Products,Inc. 217.51 Mechanical Parts&Supplies
65501 Konnie K.Gallery 60.88 Frames
65502 McJunkin Corporation 158.17 Freight Services
65503 McMaster-Carr Supply Co. 3,243.90 Tools
65504 Motion Industries,Inc.CA 55 401.38 Repairs&Maintenance Materials
65505 National Plant Services,Inc. 900.00 Vacuum Truck Services
65506 National Technology Transfer,Inc. 2.249.90 CCTV Sewedine Inspection
65507 New Horizons CLC of Santa Ana 1,675.00 Training Registration
65508 City of Newport Beach 25.57 Water Use
65509 Pacific Mechanical Supply 232.23 Plumbing Supplies
65510 Partners Consulting Services 19,680.00 FIS On-Site Support-One Worid XE Migration Project
65511 Prodata 295.00 Software Maint.
65512 Public Resources Advisory Group 7,500.00 Financial Advisory Services
65513 Restek Corp. 200.00 Training Registration
65514 City of Seal Beach Finance Dept. 238.88 Water Use
65515 Shureluck Sales&Engineering 665.58 Mechanical Parts&Supplies
65516 Smardan Supply Company-Fountain Valley 114.34 Mechanical Parts&Supplies
65517 Snap-On Tools 55.24 Tools
65518 Southern California Edison 16.00 Power
65519 Southern Counties Lubricants 1.298.34 Engine Oil
H:ldeptlfin12101CRANEIFAHR\FAHR2004\OCTOBER1CIaims Paid Report-093004.xls EXHIBIT B
ftN210Ac Page 7 of 8 10/181U)04
Claims Paid From 09/16/04 to 09/30/04
Warrant No. Vendor Amount Description
65520 Summit Steel 1,128.09 Metal
65521 Super Chem Corporation 487.63 Chemicals
65522 SBC 968.97 Telephone Services
65523 Thompson Industrial Supply,Inc. 7,782.05 Mechanical Parts&Supplies
65524 Time Warner Communications 40.47 Cable Services
65525 The Unisource Corporation 9,093.02 Office Supplies
65526 United Parcel Service 73.87 Parcel Services
65527 Verizon California 607.04 Telephone Services
65528 VWR Scientific Products Corporation 22.05 Lab Supplies
65529 YCA 1,200.00 Training Registration
65530 Aguilar,Rosa 1,450.00 Employee Computer Loan Program
65531 Aquarium of the Pacific 380.00 Reimbursable Employee Activity Expense
65532 County of Orange-Auditor Controller 75.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
65533 Myer,John&Dell 3,000.00 Employee Computer Loan Program
65534 Paul or Yolanda Lewanski 1,003.95 User Fee Refund Regarding Septic Tanks
65535 United States Treasury 20,990.44 Interest on Arbitrage Rebate Payment-Series 1992 COPS
65536 United States Treasury 5,666.30 Interest on Arbitrage Rebate Payment-Series 2000 A,COPs
65537 Court Trustee 69.12 Wage Garnishment
65538 Employee Benefits Specialists,Inc. 9,792.38 Reimbursed Prepaid Employee Medical&Dependent Care
65539 Franchise Tax Board 50.00 Wage Garnishment
65540 Internal Revenue Service 300.00 Wage Garnishment
65541 Internal Revenue Service 200.00 Wage Garnishment
65542 National Bond&Trust 2,485.36 U.S.Savings Bonds Payroll Deductions
65543 OCEA 598.61 Dues Deduction
65544 United Way 245.00 Employee Contributions
65545 U.S Postal Service(AMS-TMS) 5,000.00 Postage
65546 Government Finance Officers Association 525.00 Review Fee-Consideration of 2004 Distinguished Budget Presentation Award
Total Accounts Payable-Warrants $ 10,441,997.35
Payroll Disbursements
34920-35246 Employee Paychecks $ 60,771.68 Interim Paychecks(Retro Payments,Termination&Corrections)
35247-35339 Employee Paychecks 159,265.34 Biweekly Payroll 09/29/04
102977-103511 Direct Deposit Statements 1,079,894.36 Biweekly Payroll 09/29/04
Total Payroll Disbursements $ 1,299,931.38
Wire Transfer Payments
OCSD Payroll Taxes&Contributions $ 815,572.68 Biweekly Payroll 09/29/04
U.S.Bank 178,210.54 September Interest Payment for Series 2000,A&B Certificates of Participation
Total Wire Transfer Payments $ 993,783.22
Total Claims Paid 09/16/04-09/30/04 $ 12,735,711.95
H:ldeptUin1210\CRANE\FAHR\FAHR2004\OCTOBERkCIaims Paid Report-093004.xis EXHIBIT B
fin/21011c Page 8 of 8 10/18/2004
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Notice and Agenda for the Regular Board Meeting of Orange County Sanitation
District to be held on �1ti��f�� , 2004, was duly posted for public
inspection in the main lobby of the Districts' offices on .., /)— / C) , 2004.
IN WITNESS WHEREOF, I have hereunto set my hand this /� ~day of
2004.
Penny M. K , Secret
Board of Directors
Orange County Sanitation District
KOEMADMIMBS\FORMS\AGENDA CERTIFICATION.DOC
�`uJNR SRNI)�))oy oN
Cs ORANGE COUNTY SANITATION DISTRICT
q i
D
rC i�
Penny Kyle (2 copies no label)
November 10, 2004 Board Secretary
phone:
(714)962-2411 To the Chair and Members
fax: of the Board of Directors
(714)962-0356
www.acsd.com
Subject: Board Letter
mailing address:
P.O Box 6127
Fountain Valley.CA
92728-8127 The following are items that you may find interesting. If you need additional
street address: information on any of the items, please call me.
10844 Ellis Avenue
Fountain Valley,CA
92708-7018
Save the Date: January 14-16, 2005 for OCLS IV
Mem
Agencies Planning is now underway for the 4`h annual Orange County Leadership Symposium
at the UCLA Conference Center in Lake Arrowhead. Sponsorship is anticipated from
Cities the Sanitation District, OCFA, OCTA, OC League of Cities, LAFCO, TCA, the County
CEO, and the City Managers Association as in previous years. We are seeking
Anaheim sponsorship for the first time from water districts and the Orange CountyDepartment
Brea
Buena Park of Education. Approximately 75 attendees are expected, coming from the city
Cypress councils, district boards and the county board of supervisors. The elected
Fountain Valley Fullerton representatives of these bodies will be joined by their executive managers and a few
Garden Grove key staff members. For the second year, the facilitator will be Dr. Eric Allenbaugh.
Huntington Beach m We received rave reviews for the 2004 symposium and the planning committee
Irvine y p P g
Le Habra intends to deliver that same level of satisfaction in 2005. Dr. Allenbaugh is an author
La Palma and lecturer who has provided consultation to corporations and public agencies
Los Alamitos
Newport Beach throughout the United States for more than 20 years. We are considering topics
Orange such as re-enforcing leadership principles, moving key stakeholders from resistance
Placentia to commitment, developing collective chemist within divergent groups, and
Santa Ana P 9 chemistry 9 9 P
Seal Beach coaching others to improved performance. Look for additional announcements of
Stanton the symposium in the next two months. Last year, eight members of the Sanitation
Tustin
Villa Park District Board of Directors attended OCLS III.
Yorba Linda
County of Orange
Labor Day Weekend Spill into the Santa Ana River
Sanitary Districts
Staff continues to investigate the causes of the September 4, 2004 spill into the
Costa Mesa Santa Ana River. Staff has confirmed the volume of treated sewage discharged
Midway City
during the incident at 1.6 million gallons. This number was independently confirmed
Water Districts by a team of outside experts hired by the District. The original estimate of 13,000
Irvine Panrh gallons was based on what we now know is inaccurate information because water
level sensors were not calibrated correctly. Staff has proposed 41 corrective action
items in four areas (communications, equipment, process and training): 26 are
already in place, 7 are in the works, and the remaining 8 will be completed within 5
months to 3 years.
To maintain world-class leadership in wastewater and water resource management.
SNNI,,l/ON
0W
= P
90, Board of Directors
'N M Page 2
November 10, 2004
The Regional Water Quality Control Board (RWQCB) inspector recently visited Plant
2 to review the events leading up to the spill. His inspection report recommends a
penalty be assessed against the District. No dollar amount is indicated, but, based
on other incidents that have occurred around the state over the years, we estimate
the penalty amount could be up to several hundred thousand dollars. There are a
number of mitigating factors that should influence the RWQCB's decision about the
size of the penalty. Those factors include: the spill involved treated, disinfected
sewage discharged through an approved outfall, District staff took prompt action,
spills from the treatment plant are rare occurrences (the previous spill into the River
occurred 30 years ago), and the District has a near spotless compliance record.
A final report on the incident is in preparation and I will provide you with a copy of the
report at the board meeting. I will notify you as soon as we hear anything from the
RWQCB. Attached are the letter to the RWQCB and the list of corrective actions
(Lessons Learned Recommendations Implementation Status).
New Study Examines Swimming Associated Illness in Mission Bay
During the summer of 2004, researchers investigated health outcomes from
swimming at beaches in San Diego's Mission Bay that receive non-point runoff with
animal waste as the primary source of contamination. While previous studies in
California and around the world have examined illness rates at beaches where the
contamination is known, or assumed, to be from humans, little is known about illness
rates if the contamination is not from human sewage. Overall, illness rates were low
with gastrointestinal illness and skin rash in five to twelve year old swimmers being
the only significant health outcomes measured. The principal finding of this study
was a lack of association of traditional bacterial indicators with health outcomes. This
lack of association emphasizes the importance of research into alternative indicators,
particularly at sites where non-point sources are prevalent. In short, we must know
that bacteria are present and know whether the source is human or not.
The study, led by Jack Colford, MD, Ph.D. from the University of California, Berkeley
evaluated 8,790 swimmers at beaches throughout Mission Bay. The swimmers were
interviewed on the day they were at the beach and again by phone 10 and 14 days
later to determine whether they had become ill. Funding was provided by the
California legislature and the project was managed by Stephen Weisberg, Ph.D.,
Director of the Southern California Coastal Water Research Project (SCCWRP).
Charles McGee, (Environmental Science Laboratory, Microbiology Laboratory
Supervisor) is on the technical advisory committee for this project.
Dr. Weisberg will be at our December OMTS meeting to provide additional
information on recent SCCWRP's microbiology research findings as well as other
SCCWRP research activities.
Attached is a copy of a San Diego Union Tribune article, which is also available
electronically at
http://www.signonsandiego.com/uniontrib/20041016/news 2m16swim.html.
`oJ�R.I SAN1/,r'Oy
i
ifC,/N r u Board of Directors
Page 2
November 10, 2004
Santa Ana River Interceptor(SARI) Emergency Repairs
Efforts are underway to add base and rip rap rocks to protect two sections of the
SARI that cross the Santa Ana River in Yorba Linda. Much of the riverbed has
eroded away over the pipe since it was installed 30 years ago.
A failure of any section of the SARI, especially during a heavy rain event, would be a
major threat to downstream water quality and public health. The environmental and
economic effects of failure of the SARI would be staggering.
We have been coordinating this emergency work with the Regional Water Quality
Control Board, the County of Orange, SAWPA, the U.S. Army Corps of Engineers,
the City of Yorba Linda, the California Department of Fish and Game, and several
other organizations to obtain the necessary permits. This will ensure that the
emergency work will protect sensitive river habitat and meet our short-term
engineering goals until a long-term decision can be reached that all affected parties
can agree upon.
Jamison Engineering and Contractors has already begun to mobilize the necessary
equipment to begin this effort and is expecting to finish work at both sites by
December 16, weather permitting. A summary of events that have occurred during
2004 is attached. I will provide you updates as the project progresses.
Oh My Gosh! Coastkeepers Conclude Hard-to-Trace Sources are Responsible
for Beach Pollution.
File this under"as we have been saying since 1999", a 2'/2 year study by the Orange
County Coastkeepers has concluded that hard-to-trace pollutants, such as animal
waste and runoff from washing cars are polluting our waterways. See the attached
article.
Articles of Interest
I have also included several additional published articles that you might find
interesting.
If you would like additional information on any of the above items, please call me.
Blake P. Anderson
General Manager
BPA:99
H:\DEPT\ADMIN\GM\LETTERS TO THE BOARD\04\092204 BOARD LTR..DOC
Attachments
SANJI
ORANGE COUNTY SANITATION DISTRICT
r
Phone: November 4, 2004
(714)952-2411
fax:
(714)962-0356
www.ocsd.com Gerard J. Thibeault
ma)ling address: California Regional Water Quality Control Board
eo. ea:8127 Santa Ana Region
Fountain Valley,CA
92728-8127 3737 Main Street, Suite 500
Street address: Riverside, CA 92501-3339
10844 Ellis Avenue
Fountain Valley08-7,CA
18 SUBJECT: 90-Da Discharge of Effluent to the Santa Ana River Report
s27o9aa1a Y 9 P
Member
Agencies The purpose of this letter is to provide follow-up information to the Regional
Water Quality Control Board, Santa Ana Region (RWQCB) regarding the
Cities discharge of treated effluent to the Santa Ana River from the Orange County
Anaheim Sanitation District (OCSD) Treatment Plant No. 2 (Plant No. 2) that occurred
Brea
Buena Park on September 4, 2004. An initial letter to the RWQCB was sent on
Cypress Fountain Valley September 13, 2004, and the staff indicated in that letter that a follow-up letter
Fullerton would be sent within 90-days. OCSD staff has invested significant time and
Garden Grove resources to investigate the cause of the incident, calculate the revised
Huntington Beach
Irvine treated effluent discharge volume, and to identify and implement to the extent
La Habra possible the corrective actions to prevent this incident from reoccurring.
La Palma
Los Alamitos
Newport Beach Orange Revised Volume Estimate
Placentia OCSD hired Carollo Engineers as an independent expert to verify the volume
Santa Ana
Seal Beach discharged to the Santa Ana River at Discharge Serial No. 003, as identified
Stanton in NPDES Permit No. CA0110604, and provide recommendations to prevent
Tustin
Villa Park a similar incident in the future. The report found that a discharge occurred at
Yorba Linda this designated emergency outfall two times, from 3:00 p.m. to 3:13 p.m. and
County of Orange from 3:16 p.m. to 3:33 p.m. on September 4, 2004. Based on this and other
supporting information the estimated treated effluent volume that was
Sanitary Districts discharged is 1,569,600 gallons.
Costa Mesa
Midway city The effluent discharged was a blend of primary and secondary treated
Water Districts wastewater that would have normally been discharged through Discharge
Irvine Ranch Serial No. 001 (the long ocean outfall). A detailed description of the Carollo
Engineering report is enclosed as ADDENDUM TO THE INCIDENT REPORT
OF SEPTEMBER 4, 2004 PLANT 2 UPSET.
To maintain world-class leadership in wastewater and water resource management.
46,�tti 5 1�r C4
6
C
'M i Mi
Gerard J. Thibeault
Page 2
November 4, 2004
Corrective Actions
From this incident OCSD had been given the opportunity to carefully consider
the design, maintenance, and operations of its facilities to prevent a repeat of
the discharge. OCSD staff has proposed 41 corrective action items and their
detailed status can be found enclosed in the report. Twenty-six have been
implemented, 7 are undergoing implementation, and the remaining 8 will be
completed within 5 months to 3 years from now. These corrective action
items have been categorized into four areas: Communications, Equipment,
Process, and Training. Five items were considered critical as able to prevent
the discharge, and these items have been expedited to prevent a similar
incident from reoccurring.
Mitigation of Discharge
Although OCSD was not able to prevent the discharge from happening, staffs
quick response to this incident was able to protect the public and environment
from a more serious threat and prevent a long-term shut down of wastewater
treatment facilities. The following is a brief discussion of efforts undertaken to
mitigate the discharge and its impact.
Despite numerous peak storm events over the last two decades and other
short-term emergencies and power failures, OCSD has been able to treat and
discharge ALL influent wastewater through the treatment works and deep
ocean outfall. OCSD specifically designs and operates its facilities to
maintain adequate treatment and disposal at all times including predictable
emergency conditions. OCSD provides backup ocean outfall pumping,
backup power generation, and process wastewater storage to prevent
unintended discharges.
At the time of the discharge to the Santa Ana River, OCSD was undergoing
numerous efforts to maintain normal operations. These include the
construction of the new Effluent Pumping Station Annex (EPSA), Energy
Masterplan, New Plant No. 2 Headwork, High Flow Integrated Emergency
Response Plan training, and numerous other projects and activities which
enhance treatment reliability. OCSD is in the midst of a substantial capital
improvement program, and this discharge in no way was the result of an effort
to avoid costs or gain an economic advantage.
dMj $AM I),,rIO
� � N
O,
0
ff
Gerard J. Thibeault
Page 3
November 4, 2004
The Discharge to the Santa Ana River is an authorized discharge point for
emergency discharges under OCSD's NPDES permit. OCSD's facilities are
specifically designed to overflow discharges to the Santa Ana River to avoid
flooding of the treatment facilities that could result in long-term losses of
wastewater process units. If onsite facilities were flooded from overflows,
OCSD may have lost the ability to treat wastewater flows and discharge
effluent to the long ocean outfall. Fortunately, the discharge was limited to a
few minutes until power was restored to the effluent pumping system.
Corrective actions include the improvement of the treatment system to further
avoid discharges to the Santa Ana River while protecting the treatment plant.
OCSD staff responded quickly to the incident including rapid mobilization of
staff through the Incident Command System, immediate notification to the
regulators and Health Care Agency, and the monitoring of the local beaches
to help quantify any impacts from the discharge. It's important to note that the
discharge was treated wastewater and not raw sewage. OCSD staff was
unable to capture any of the discharge as the discharge occurred very close
to the mouth of the Santa Ana River near high tide.
The discharge flowed immediately into the ocean waters. OCSD staff worked
with the Orange County Health Care Agency to assess the situation and
conduct additional monitoring. As noted in the letter of September 13, 2004,
OCSD staff conducted monitoring upcoast and downcoast of the river mouth
immediately after the incident and on the Sunday and Monday following the
incident. As stated before, only those samples taken at the river mouth
indicated the obvious presence of treated wastewater.
Closing
OCSD remains committed to the public health and environment for Orange
County residents and visitors, especially regarding the protection and
enhancement of local beaches. This commitment was demonstrated with
OCSD's recent decisions to upgrade its level of treatment and add effluent
disinfection to the treatment system. OCSD staff is working diligently to avoid
all unintended discharges and maintain the beneficial uses of local waters.
OCSD staff is available if you have any questions regarding this incident.
J�Y lANf
aoW
s
n
rH
N
Gerard J. Thibeault
Page 4
November 4, 2004
While many staff members are working to address the incident, please
contact Dindo Carrillo on my�staff
at (714) 593-7476 for further assistance.
Edward M. Torres
Manager, Environmental Compliance Services
DC/hh
HAdept\ts16601cariIJod190-day SAR Discharge Letter(2).doc
Enclosure(s)
cc: B. Anderson B. Ghirelli
B. Ooten V. Franciso
S. Basrai D. Halverson
D. Carrillo L. Honeybourne -OCHCA
J. Colston D. Ludwin
D. Cook M. Esquer
Plant 2 River Discharge Incident
Lessons Learned Recommendations Implementation Status
# Task Res . Due Date Status Notes
Communications
Change the procedure for calling in
the Division 860 staff authorized to
operate 12kV equipment so that the A new list with call in
C1 entire list is called if the on-call staff is Watson, Cook Completed instructions has been placed in
not immediately reached. This will both Control Centers.
allow quicker response to power
emergencies.
On-duty staff should start making call
ins immediately after an incident that
leaves the plant in an unstable New call-out response now
directs Operations staff to
condition. This will provide staff to
C2 man phones and to respond to Cook Completed immediately call in emergency
possible deteriorations in the response staff during unstable
conditions. This is especially electrical conditions.
important in power loss situations.
Expand the notification list to include
affected cities and other agencies
such as City of Huntington Beach, Notification lists for the Cities of
fire and police, and lifeguards. These Huntington Beach and Newport
C3 notifications would make these Torres, Cabral 1/15/2005 Beach have been completed.
agencies aware of the problem and Working on the notification list
make sure they have the correct for the other affected cities.
information to plan their own
responses.
Establish a procedure for the call-in
C4 for the standby Power Plant operator Cook Completed
during an electrical outage event
Establish a procedure for the call-
CSin/notification of the maintenance
supervisors in the incident response Cook Completed
procedures
Cell phones provided vital Cingular and AT&T are
communication links during the scheduled to merge equipment
incident but the coverage was in December of this year. At
C6 sometimes spotty. Evaluate other Castillon Completed that point, more cell sites will
come on line and
service providers or communication we'll have
better coverage throughout
means for better coverage.
California.
1 of 7
Plant 2 River Discharge Incident
Lessons Learned Recommendations Implementation Status
# Task Res . Due Date Status Notes
The advantages of an auto-dial
notification system should be
investigated rather than relying on
individual calls by on-duty staff. The
C7 initial moments of any incident Castillon 3/1/2005
require all the attention of the limited
staff on duty and the automation of
this step would free time for other
activities.
Add a separate phone line in the
control rooms reserved for calls from Castillon to meet with Heinz
staff responding to incidents. Other and Wade. Need procedures
C8 callers quickly overwhelm the normal Castillon 3/1/2005 established so that staff calls
phone lines and a separate line
would facilitate response staff getting that number.
needed information.
Responding staff must check in with
the incident commander before
deploying to the field. This allows for
resource coordination and
assignment to priority activities. In This is already part of the ICS
C9 this incident some staff arrived at the Esquer, Completed procedures. This part will be
plant and went directly to where they Watson p highlighted during all future
thought they could do the most good. training.
This potentially resulted in a delay
reconnecting to Edison and may
have contributed to the eventual
discharge to the river.
Establish a check-list for operations
C10 staff of the prioritites in case of power Cook Completed
outgaes.
2 of 7
v
Plant 2 River Discharge Incident
Lessons Learned Recommendations Implementation Status
# Task Res . Due Date Status Notes
Equipment
Replace the UPS in the PDF building
with an industrial quality UPS and
provide a source of standby power Esquer, The existing UPS will be
E1 for the UPS. This will prevent the 11/15/2004 replaced with a more robust
loss of monitoring and control that Watson UPS
was experienced in several past
power outages.
Recalibrate the OOBS wet well level
E2 sensors to read accurately from the Watson 11/10/2004
bottom of the well.
E3 Add a level sensor to the box going Esquer, Cook 9/1/2005 To be done as a Facilities
to the river from the OOBS wet well. Engineering Project
Recalibrate the level sensors in the
E4 Foster termination channel so they Watson 11/10/2004
can read levels over the weir.
Change the level sensor in the
overflow channel next to the Foster
E5 termination channel from a sonic type Watson 12/15/2004
to a bubbler type to make level
measurements possible even though
water is water falling over the weir.
E6 Correct the miss tagged level Watson Completed
sensors
E7 Installation of the Headworks UPS Watson, Completed
transfer switch Esquer p
Evaluate the feasibility of upgrading In progress under a current
E8 the Cen-Gen starting air system Esquer 1/1/2007 Capital Improvement Project
(Project-J-79-1)
Recalibrate and adjust the air
pressure regulator to allow the OOBS
E9 wet well and Termination Channel Esquer 11/10/2005
level sensors to read to a range that
extends to the top of the deck of the
corresponding structure.
Increase the frequency of
El maintenance to a weekly test of Watson Completed
Foster 3rd level power generation
3 of 7
Plant 2 River Discharge Incident
Lessons Learned Recommendations Implementation Status
# Task Res . Due Date Status Notes
Process
Establish procedures for using new
P1 P1-37 basins for storage during flow Cook Completed
emergencies.
Implement a pressure relief system
for the collections system to prevent
dangerous manhole pop-ups in To be done as a Facilities
P2 streets caused by back pressure. Esquer 9/1/2007
Perhaps with dedicated vents or with Engineering Project
manholes not located in the street
such as in parkways.
The outfall friction went down after
the high quantity of pumping that
occurred after the incident.
Investigate the potential for The 10/14/04 high-flow event
P3 scheduled periodic high quantity Cook, Esquer Completed reduced the friction factor.
pumping to keep the outfall pipe
clear. This would reduce energy
costs for pumping and increase
gravity flow in emergencies.
Review the District standards for
OOBS wet well level to see if a lower
P4 normal operating level can be used. Esquer 1 2/2 012 0 0 4
This would provide additional time to
respond to emergencies.
The procedure for starting process
loads when the plant is isolated from
Edison needs to be reviewed and
P5 staff trained. This will avoid Watson Completed
overloading the available capacity of
CenGen and the resulting generator
tripping.
Consider changing operating
philosophy by limiting CenGen's
The operating philosophy
responsibility during power isolations
from Edison to powering the OOBS during ablack-start is for Cen-
Cook, Gen to power only GOBS. This
P6
station only. Influent pumping power Completed is documented in the SOP for
would come from the standby Esquer black-starts. The second part
generators in the headworks. This
would eliminate the potential for would come from the
overloading the CenGen engines and implementation of E7
losing outfall pumping.
Standby storage basins and other
essential facilities and equipment
P7 should not be locked out of service Cook Completed
when contractors are not actively
working on them.
4of7
Plant 2 River Discharge Incident
: Lessons Learned Recommendations Implementation Status
# Task Res . Due Date Status Notes
Make the status of Edison power A computer is now installed in
available in the plant and CenGen the Cen-Gen switch-gear room
P8 control rooms so that 12kV Esquer, Completed which will allow the Plant Power
electricians can be tasked with Watson p Operators to see the availability
reconnecting to Edison power as of power at the 12kV Service
soon as possible. Center
Remove the bulkhead from the
overflow line that runs from the
P9 OOBS overflow channel to District Esquer 3/1/2005
5/6 trunk line. This will allow the line
to operate as intended.
Review pertinent capital projects to The Construction sequence of
make sure water in/water out the on-going J-77 Project was
P10 processes are not being Esquer Completed conducted. A similar review of
compromised as part of the design or other projects such as P2-66
as part of the construction sequence. that impact water-in/out will be
conducted prior to construction.
The Foster Pump Station including
the four standby generators are
scheduled to be put permanently out
of service in May 2005 as part of the The 3rd level generation at
P11 Effluent Pump Station Annex(J-77) Esquer Completed Foster will not be taken out until
project. The schedule and the the new generators are in
construction sequence should be place.
reviewed to see if the time with no
outfall pumping backup could be
shortened.
A contractor inspected the
Check the flap gates at both gates and removed some
P12 locations for leaks when the tide is Watson Completed debris to ensure the gate does
high and repair. not leak. Currently there is
some minor leak.
Correct the level of the Foster
P13 overflow channel wall on master Esquer Completed
drawings.
Establish procedures for limiting
P14 influent pumping during flow Cook, Esquer Completed This is part of the Operations
emergencies to use the collection basic procedures.
system for storage.
5of7
Plant 2 River Discharge Incident
Lessons Learned Recommendations Implementation Status
# Task Res . Due Date Status Notes
Training
Expand and clarify the list of Division
860 staff authorized to operate 12kV
equipment by providing training so
that responses are quicker. Train the
T1 Power Plant Operators to reconnect Watson Completed
to Edison. The size and complexity
of the high voltage distribution system
is expanding at both plants and
electric power is essential for plant
processes.
Provide more training for PPG's on
the capabilities of the engines and
power distribution and switching. On-Going training is scheduled
This training should include actual
with the Plant Power Operators
simulations of Edison power loss and and Electrical Supervision.
T2 conducting black starts. The training Watson Completed Operations has started
should include all shifts and be
coordinated with Operations and scheduling training on third level
generation with electrical staff.
electrical maintenance staff so they
will have a chance to practice the
procedures as well.
Off-shift Operations staff frequently
do not get the same level of training Training has been scheduled
T3 as the on-shift staff. Cook,Watson Completed and the electricians will provide
Accommodations should be made to training twice a year.
allow off-shift staff to participate in all
training opportunities.
Additional live practices of
emergency situations should be
conducted for electrical emergencies
and other incidents and natural
disasters. Though procedures are in Cook, Operations has started
T4 place and reviewed on a regular Watson, Completed scheduling training on third level
basis,nothing takes the place of Esquer generation with electrical staff
walking through the response
especially if the situation can be
simulated and the equipment and
staff tested.
6 of 7
Plant 2 River Discharge Incident
Lessons Learned Recommendations Implementation Status
# Task Res . Due Date Status Notes
A computer has been installed
Evaluate the feasibility of locating a so that the Pump Power
computer in the cen-gen switchgear Watson, Operators can view the status
T5 room for electrical SCADA to enable Castillon Completed of the power at the 12kV
the Pump power operator to see the service center. Additionally,
status of the power systems. they can see the status of the
rest of the plant.
Provide 12kV breaker training to
PPOs. This will allow PPOs to close
T6 the 12kV breaker in the event of a Watson Completed
Edison Power blip without waiting for
the trained 12kV staff from Division
820.
7 of 7
NOVEMBER 09, 2004
SANTA ANA RIVER INTERCEPTOR EMERGENCY REPAIRS,
CONTRACT NO. 2-41-3
• On July 20, 2004 the District authorized RBF to conduct the District's annual
topographic monitoring survey at critical locations within the Santa Ana River Bed.
• Due to the Corps construction behind PRADO Dam, the Corps was unable to hold
any water back thereby allowing all flows to pass through, creating high water levels
within the low flow channel. This created some difficulty for the survey to be
completed, however, District authorized RBF to complete an interim report of the
completed work.
• On September 14, 2004 RBF surveyors, while in the process of plotting the survey
cross sections, alerted the District of the two areas with minimal soil cover over the
pipeline.
• District staff analyzed the erosion issues immediately and consulted with the
USACOE and RDMD staff on the problem. On September 22, 2004, District staff
along with members of the USACOE engineering staff visited the site to assess the
existing conditions of the riverbed. A meeting was held at 1:00 pm on the same day
with USACOE, RDMD, SAWPA, and OCSD at Prado Dam construction trailer where
the findings were discussed in detail. It was decided at this meeting that an
emergency action needed to be taken to fix the erosion problem.
• On September 23, 2004 a conference call was held with senior management of
OCSD, RDMD, USACOE, and SAWPA where the issues were discussed and the
USACOE requested the OCSD prepare a letter declaring the needed repairs be
considered under an emergency action item.
• OCSD issued this letter on September 27, 2004 and, in addition, requested the
engineering assistance from the USACOE. On the same day, USACOE, RDMD,
SAWPA and OCSD staff met out in the filed and analyzed the two erosion areas to
develop a strategy to design a repair method.
• OCSD staff immediately authorized RBF to prepare an aerial topographic map of the
two erosion areas from which base maps were prepared. While RBF staff were
working on the development of the aerial survey maps, USACOE engineering,
environmental, and regulatory staff were working on the development of a rip rap
method of design to restore the cover over the pipeline at the two erosion areas.
• On October 13, 2004 OCSD staff met with USACOE engineering, environmental and
regulatory staff in Los Angeles and discussed the design details.
• On October 15, 2004 the aerial topographic base maps were received from RBF and
OCSD staff started on the preparation of the construction plans.
• On October 18, 2004 OCSD consulted with Jamison Engineering and Contractors
and requested the assistance of a biologist from Bonterra to field identify and tag
trees to be removed and or trimmed for the staging areas.
• On October 20, 2004 OCSD, RDMD, SAWPA, USF&WS, RWQCB,
CADF&G(absent)and USACOE met at the PRADO Dam construction trailer and
discussed the detailed design and the method of construction of the rip rap
protection. At this meting all of the regulatory agencies agreed for the work to
proceed immediately.
• On October 22, OCSD staff completed the preparation of the construction plans
which were distributed to staff members as well as the contractor. On this date the
USACOE also issued the Regional General Permit 63 authorizing the construction
work to proceed as designed.
• The District has Contracted with Jamison Engineering and Contractors to complete
the Emergency Repairs.
• On November 2, 2004 District staff, at the request of the City engineer attended the
Yorba Linda City Council and presented an overview of the project and requested an
encroachment permit.
• The Contractor started working on 11/02 at both Sites (MH 7—8) and (MH 30- 31)
simultaneously as follows:
1) Area 1 (Between MH 30—31)
Area 1 has been surveyed and pipeline was staked on 11/03
Access road has been staked with the assistance of the biologist on 11/03
Transportation permit will be obtained from City of Yorba Linda today 11/04
Grading commenced on 11/05
Trucks start hauling rocks to build staging area on 11105
Crane assembly started on 11/08 and will be completed on 11/09
Trucks started hauling Rip Rap rocks on 11/09
Placement of rip rap will commence on 11/10 and be completed by 12/16
2) Area 2 (Between MH 7—8)
Access road grading and staging area preparation work started on 11/02
Area 2 has been surveyed and Pipeline was staked on 11/02
Access road has been staked with assistance from biologist on 11/03
Transportation permit was obtained from the City of Anaheim on 11/03
200 Tons of Base and Rip Rap rocks for preparation of crane staging area
was delivered today 11104
Potholing of the pipeline on south side was completed on 11/03 with north
side scheduled for 11/04
Roadway grading and staging area preparation commenced on 11/05
Crane assembly will commence and completed on 11/09
Trucks started hauling Rip Rap rocks on 11109
Placement of rip rap will commence on 11/10 and be completed by 12/16
• District Staff has obtained permits from USACE, County of Orange, RWQCB
(exempt) and CADF & G. Staff has also been continuously coordinating with USF &
WS. Bicycle Coalition has been contacted and informed of the project. In addition,
staff has informed the Chino Hills State Park, Caltrans, California Highway Patrol,
and the Citizens Advisory Committee, of the project. Contractor has obtained
transportation permits from Cities of Yorba Linda and Anaheim
• District Staff and Contractor are continuously coordinating with the USACE Prado
Dam Operations to get information on daily and projected releases from Prado to
plan their daily work activities within the riverbed. In addition, staff is also checking
the daily weather forecast to help plan work activities ahead.
HK:
f
ENVIRONMENT
Pollution still streaming into.water
Orange County CoastKeeper report shows runoff from hard-to-trace sources is
largely responsible for the continuing problem.
Alicia Robinson
Daily Pilot
November 7, 2004
NEWPORT BEACH — Orange County's streams are polluted by some easily traceable
sources, such as dairy farms, and much of that has been stopped or reduced recently.
But harder-to-trace pollutants, such as animal waste and runoff from washing cars, are
still spoiling some waterways, a new report shows.
Two-and a-half years of research and the work of more than 200 volunteers went into a
report released this week by Newport Beach-based, water-quality watchdog Orange
County CoastKeeper.
The study collected data on streams in three counties including San Diego Creek and
the Santa Ana River. Results show that pollution is coming largely from hard-to-trace, or
"non-point," sources, Orange County CoastKeeper project manager Ray Hiemstra said.
"The most important finding, as far as I'm concerned, is that these problems are still
there despite a lot of the work that's been done on non-point sources," he said.
"Everybody's going to have to pitch in to lower the pollution in these creeks because the
big problems have been found and corrected in most instances."
Funded by the California Environmental Protection Agency, the 2 1/2 -year study used
volunteers, trained by CoastKeeper, to take water samples once or twice a month and
test them for various kinds of pollution and bacteria. The volunteers also checked twice
a year on the bugs and other aquatic life, which can indicate the health and content of
water bodies.
Testing was performed at 27 sites in three counties. Volunteers checked for bacteria,
dissolved oxygen, ammonia and nutrients.
The data confirmed that the Santa Ana River and San Diego Creek have poor water
quality with high levels of bacteria and dissolved minerals, Hiemstra said. That's been
shown by other studies, but the overall project is still valuable for various reasons, he
said.
Fixing the problems in San Diego Creek will likely cost hundreds of millions of dollars,
so there's no such thing as too much data, Hiemstra said. And while the Santa Ana
River has been greatly tested, the monitoring project also included creeks that haven't
been studied before and creeks that are listed by the state Environmental Protection
Agency as impaired but may no longer have the problems that got them on the list.
"This program with the volunteer monitors is doing the monitoring that the state would
like to do [but] for about half the price," he said.
To clean up their creeks and coastline, cities and water agencies are trying a variety of
programs and testing new technologies, and they're attacking pollution sources when
they can find them, said Bob Ghirelli, director of technical services for the Orange
County Sanitation District.
"I think we understand now that the non-point-source pollution is probably the largest
contributor of pollution to our coastal streams, rivers and the shoreline," he said. "What's
really left is the urban runoff, non-point-source pollution that needs to be dealt with."
Sanitation district officials have been discussing putting forward a ballot issue to charge
residents a yearly fee that would pay for cleaning up runoff. Voters in the city of Los
Angeles just approved a $500 million bond measure to pay for runoff improvements.
"It takes money to pay for all these programs, and one of the big issues is how do you
continue to pay for all these programs," Ghirelli said.
Orange County supervisors organized a steering committee of water officials to address
water quality issues, and the group plans to pursue a possible runoff clean-up fee, he
said. In earlier discussion, the fee was expected to range from $25 to $50 a year per
household.
District launches research vessel
Jeff Benson
Daily Pilot
November 6, 2004
The Orange County Sanitation District will officially christen its new $1.3-million ocean
research vessel "Nerissa" today at the Newport Harbor Nautical Museum in Newport
Beach.
The district plans to use it to collect water samples and monitor the effects of
wastewater discharge on the marine environment.
The new vessel will protect local marine life by testing a 35-square-mile stretch of
coastal waters, from Crystal Cove to Seal Beach. It will also test the wastewater
discharge released 200 feet below the surface from an outfall pipe 4 1/2 miles off the
coast of Huntington Beach, district spokeswoman Sonja Wassgren said.
"I think the vessel itself is actually a testament to how the sanitation district is committed
to protecting marine life," Wassgren said. "Our program is a national leader and this is
one more way to solidify and show it."
The Harbor Patrol will welcome the boat into port at an 11 a.m. invitation-only ceremony
by spraying water from its fireboat's hoses, Wassgren said. There will be food, games,
crafts and educational booths for children.
The white, 58-foot boat will house the equipment the district uses to monitor the waters,
including an echo sounder, radar, deck crane, VHF radio, a plotter with a global
positioning system and a large instrument wench that can lower marine apparatuses to
collect water samples, Wassgren said.
The vessel will conduct three types of monitoring —core monitoring, regional studies
and in-depth studies.
Through core monitoring, crew members will take measurements and water samples so
they can analyze data and see the effects of treated wastewater on marine life.
The district will also work with other agencies to study water conditions from Point
Conception in Santa Barbara County to Cabo Colnett in Mexico.
"By comparing our monitoring results with other agencies in the Bight, it helps to get a
regional perspective on what's happening in the ocean," Wassgren said.
And the district will conduct special in-depth studies, such as wave transportation
mechanisms, not addressed in routine monitoring, she said.
Orange County Coastkeeper founder and executive director Garry Brown suggested the
boat's christening at Newport Harbor Nautical Museum.
"The water in front of Newport Beach and Huntington Beach is probably some of most
studied and monitored water in the country," Brown said. "This boat is brand new and
[specified] by the district to do the type of testing they do. Not only do they do the type
of testing they did in past, but now they're doing even more testing. They'll have their
own boat, and it allows them the flexibility to do their testing almost on call if something
happens."
The crew will test for pH, oxygen and bacteria levels at different water depths, Brown
said.
The crew will spend as much as 12 hours per day on the boat, where they will also be
able to eat and sleep comfortably, Wassgren said.
"It's a beautiful boat," Wassgren said. "It's all specifically designed to be a research
vessel, and its custom designed and built to use the monitoring equipment we have. It
gives us the flexibility we need and keeps the crew safe."
When selecting from one of 640 names for their new ocean research and monitoring
vessel, members of the Orange County Sanitation District's Environmental Assessment
District ultimately decided on "Nerissa." In Greek mythology, Nerissa, the sister of a
goddess, lived on the bottom of the ocean and rendered protection and assistance to
the sailors who passed by.
"The name just fits," Wassgren said.
Daily Pilot
October 28, 2004
'The OC' awarded with key to the city
■The popular TV show set in Newport Beach gets a place on the newly formed
Walk of Fame at Balboa Pavilion.
Deepa Bharath, Daily Pilot
NEWPORT BEACH —They already have the key to prime-time television
success.
Tonight, cast members and producers of the Fox network's "The OC" will get a
key to Newport Beach, the city that has provided the show with a backdrop, richly
woven with drama and mystique.
The show has lent fame and notoriety to this city, enhancing its image as a
popular tourist destination, said Gail Ossipoff, spokeswoman for the Newport
Beach Conference and Visitors Bureau.
"This show has brought a lot of positive attention to the city," she said. "I was in
New York City recently, and everybody was asking about this show. It's not just
around here. It's across the country."
The bureau is realistic about the content of the show, which portrays the action-
packed lives of pretty, young, rich Newport Beach men and women, complete
with sex, drugs, revenge and betrayal, Ossipoff said.
"It's not a reality show," she said. "It's entertainment. You take it with a grain of
salt just like 'Dallas' or'Beverly Hills 90210."'
Newport Beach Mayor Tod Ridgeway, who has previously said the show is
entertaining but an exaggerated version of the city, will present the key to cast
members.
Tonight's event, starting at 6:30 p.m., will also feature a "cement ceremony,"
where "The OC" will be immortalized on Newport's newly created Walk of Fame
at the Balboa Pavilion, Ossipoff said. To top it off, the mayor will make a
proclamation in appreciation of"OC Thursdays," drawing attention to the fact that
the show will now air Thursdays instead of Tuesdays. The Balboa Fun Zone will
be open from 7 to 9 p.m. courtesy of the show. The show's season premiere will
be Nov. 4.
Ridgeway was not available for comment on Wednesday, but his wife Kay said
that as parents of a freshman in high school, they sense the show's popularity
among local high school students.
"A lot of local high school students watch the show and find it entertaining, on the
cutting edge and very cool," she said.
Her son and his friends are excited that the city is strengthening its relationship
with the show, Kay Ridgeway said.
Councilman Steve Bromberg said he feels almost neutral on the issue. He
declined an offer last year, when he was mayor, to go on the "Sharon Osborne
Show" and present "The OC" with a key to the city, Bromberg said.
"At the time, I thought it wasn't representative of the city," he said. "I thought the
show put us in a bad light."
But since then, he has heard that the show had "gotten better," Bromberg said.
"I haven't been watching," he added. "But if the Conference and Visitors Bureau
thinks this is a positive things for the city, that's good."
He won't be attending the event because of another commitment, Bromberg said.
"I'm not boycotting it or anything though," he added with a laugh.
- DEEPA BHARATH is the enterprise and general assignment reporter. She
may be reached at (714) 966-4625 or by e-mail at deepa.bharath@latimes.com.
Los Angeles Daily News
Voter support seen for water runoff law
By Rick Orlov and Kerry Cavanaugh
Staff Writers
Wednesday,November 03, 2004 - Los Angeles voters appeared to be giving their approval
Tuesday to a$500 million bond issue that is supposed to pay for projects to reduce trash and
waste that flow into city waterways and ultimately pollute the ocean.
Measure O, which had to get two-thirds approval to pass, would pay for projects to meet more
than 60 regulations to curb pollution in waterways under the federal Clean Water Act. A
coalition of political, business, labor and environmental groups supported the ballot measure,
which had no organized opposition.
"We really don't have much of a choice," Mayor James Hahn said. "We are facing these federal
mandates, and we need to have this bond approved or it's going to mean we have to cut other
programs to clean up our water.
"I think that's why so many people have come together to support this proposal."
The measure would raise taxes on residential, commercial and industrial property in the city. It
would add $34 a year for 24 years to the property-tax bill of a home valued at $350,000,officials
said.
George Kieffer,president of the Los Angeles Area Chamber of Commerce, said business groups
felt the measure was important.
"This is a quality-of-life issue, and we think Los Angeles can attract more businesses if we have
a clean environment, one where we are taking care of problems like this."
Supporters of the ballot measure argued that it is needed to clean up a city that has 7,300 miles of
paved streets, either littered with trash or stained with motor oil and other toxic chemicals.
"The problem is when it rains, all this flows down into the ocean and rivers and lakes,"
Councilman Eric Garcetti said. "And, if we do this, other cities can take action to clean their
urban runoff."
The measure would fund the purchase of screens to keep trash from storm drains, install
equipment to divert bacteria-laden storm water into sewers and help pay for park projects and
green space to collect runoff.
Like other measures approved in recent years to win voter confidence, Measure O crates a
citizens oversight committee with a requirement for regular audits to ensure that the projects are
done on time and on budget.
Measure O would generate funds to help pay the multibillion-dollar cost of implementing dozens
of wastewater-pollution safeguards required by the federal Clean Water Act.
Current storm-water fees generate $28 million annually, while implementing only the first five
limits on pollutants in waterways will cost an estimated $541 million. Implementing the other
regulations likely will require other sources of new revenue, officials said.
Rick Orlov, (213) 978-0390 rick.orlov(a)dailmews.com
http://www.latimes.com/features/outdoors/conditions/la-os-beach2novO2,1,697825O.stoty
Beach report
November 2, 2004
Los Angeles County
Westward A+
Malibu Pier—50 yards east D
Surfrider Beach—breach location F
Topanga State Beach F
Will Rogers—Temescal Canyon F
Santa Monica Municipal Pier—50 yards south D
Ocean Park Beach—Ashland Avenue C
Venice—Windward F
Venice—Topsail St. D
Dockweiler—Imperial Highway A+
Manhattan Beach Pier A+
Hermosa Beach Pier C
Redondo Municipal Pier F
Palos Verdes Cove A+
Portuguese Bend Cove A+
Cabrillo—harbor side of lifeguard tower F
Long Beach—3rd PI. F
Belmont Pier—east side F
Orange County
Seal Beach—1st Street F
Huntington State Beach—Brookhurst Street B
Newport Beach Pier A+
Balboa—the Wedge A+
Laguna Beach—Main Beach F
Monarch Beach—north F
Salt Creek Beach A
Dana Point—Dana Strand Beach A+
Doheny State Beach—south of San Juan Creek F
Capistrano Beach—Camino Estrella A+
San Clemente—Poche Beach B
San Clemente Beach—Avenida Calafia A+
San Diego County
Oceanside—Harbor Beach A+
Oceanside Beach—Surfrider Way A+
Encinitas—Moonlight Beach B
Ventura County
Rincon—50 feet south of creek A+
Oxnard—Starfish Drive A+
Ormond Beach—Arnold Road A+
Point Mugu Beach D
Source: Heal the Bay
Water quality"dry grades" as of Oct. 25 for L.A. County, Oct. 26 for Orange and Ventura
counties and Oct. 24 for San Diego County are based on samples'bacterial pollution levels in the
surf zone.
November 02,2004 07:40 PM US Eastern Timezone
LADWP Board Approves Appointment of City Veteran as New General
Manager
LOS ANGELES--(BUSINESS WIRE)--Nov. 2, 2004—The Los Angeles Board of Water and Power
Commissioners today voted to recommend approving the appointment of Ron Deaton as General
Manager of the Department of Water and Power(LADWP). The City Council will have 45 days from
receipt of the Board's action today to confirm Deaton's appointment.
This appointment follows the resignation of David Wiggs.Wiggs, who had been on medical leave since
February, announced his resignation on Oct. 28, effective Nov. 30.
LADWP Board President Dominick Rubalcava said,"We are absolutely delighted to have the opportunity
to have Ron Deaton as general manager. His wealth of information, knowledge and background with the
City, LADWP, and the City Charter will insure immediate success. I look forward to working together with
him and facing the challenges ahead."
Deaton has served in the City's Chief Legislative Office since 1976. As chief legislative analyst, Deaton
has been the legislative and financial advisor for the City Council since he assumed the top position in
1993. Leading a staff of 50 employees, Deaton provides analysis and recommendations to council on a
broad spectrum of vital City issues. Under his leadership, the CLA office also has served as caretaker in
five City Council Districts during periods when the elected offices were vacant.
"I am very pleased and honored by the action of the commission today and truly excited about the
opportunity to lead the DWP," Deaton said. "It means a great deal to me to have the confidence of Mayor
Hahn and the DWP Commission as we enter a new era of increasing community outreach, expanding
renewable power resources, and meeting the growing demand for water resources. I look forward to a
discussion of these and other LADWP issues with the members of the Los Angeles City Council and the
Council's Commerce, Energy and Natural Resources Committee as the confirmation process proceeds."
Deaton added, "On a personal note, I must say I love the City of Los Angeles --and the most precious
resource of the people of the City,the DWP."
If confirmed by the City Council, Deaton's career will come full circle with the appointment as LADWP
general manager. He began his City career at the LADWP in 1965 in budget preparation and market
research. From 1968 to 1976, Deaton worked in the City Administrative Office, where he was responsible
for budget analysis, management audit teams and water and power analysis.
A graduate of California State University at Long Beach, with a B.A. degree in Economics, Deaton holds
an MBA degree from the University of Southern California. He and his wife, Ellery, whom he met at
LADWP, reside in Seal Beach.
During today's Board meeting, Rubalcava thanked Henry Martinez, chief operating officer of the power
system who most recently served as interim general manager. He also thanked Frank Salas, a 40-year
veteran of LADWP who retired on Nov. 1, for serving as interim general manager earlier this year. "Henry
and Frank are both owed a debt of gratitude for stepping in to lead the Department during a challenging
period," Rubalcava said.
Los Angeles Times: Cities Address Sticky Situation That Can Lead to Sewage Spills Page 1 of 3
http:/'/www.latimes.com/news/I ocal/state/la-me-grease2 nov02.1,7754156.story?colI=la-news-state
Cities Address Sticky Situation That Can Lead
to Sewage Spills
Restaurants are facing a Dec. 30 deadline that bans depositing
grease into O.C. sewers.
By Sara Lin
Times Staff Writer
November 2, 2004
Three years after sewage spills caused a record number of beach closures in Orange County,cities and
sanitation agencies are targeting the primary culprit: grease.
Cities in much of the county are under the gun to meet a Dec. 30 deadline that bans restaurant owners
and others from pouring cooking grease down the drain, where it can block pipes and send sewage into
the ocean.
From Yorba Linda to Newport Beach, 32 cities and water agencies in north and central Orange County
are requiring restaurants, school cafeterias and hospitals—considered the biggest grease producers to stop using garbage disposals and instead mop leftover food residue and oil into trashcans. Large
grease producers may have to install subterranean interceptor tanks to filter fats and oils out of
wastewater.
The aim is to eliminate the whitish goo that clings to the sides of sewer pipes, restricting water flow and
eventually causing blockages and spills. Most of the beach closures are the result of contamination from
sewage spills that flow into the ocean, either from drains or waterways.
Beach closures are a financial hardship for coastal cities, emptying boardwalks and beachfront
businesses after county health officials find poor water quality. In 1999, the water off Huntington Beach
became so contaminated that miles of shoreline had to be closed during the height of summer.
Since Orange County suffered 51 beach closures in 2001, the yearly number has been cut in half. So far
this year, there have been 25 closures, according to Orange County Health Care Agency records.
Some restaurant owners, however, think cities are targeting the wrong crowd.
"We've been trained decades upon decades to keep grease from going down the drain," said Dan
Marcheano, who owns the the Arches restaurant in Newport Beach. "Logic would tell you that I
wouldn't want to deal with a plumber at 8 o'clock on a Friday or Saturday night."
Marcheano thinks officials should put more effort into educating homeowners not to throw food and
httn://www.latimes.com/news/local/state/la-me-erease2novO2,1,2311407,print.story?coll=l... 11/2/2004
Los Angeles Times: Cities Address Sticky Situation That Can Lead to Sewage Spills Page 2 of 3
grease into the sink.
"If you have a restaurant that has 300 dinners on a Saturday night and you have 300 residences serving
dinners on the table, those households will produce more grease going down drains than any restaurant,"
he said.
Grease buildup in sewers has become such a nuisance in recent years that the Santa Ana Regional Water
Quality Control Board in 2002 ordered local sewage collection agencies to come up with a sewer
maintenance plan to help eliminate sewage spills. The grease ordinances being heard before city
councils this fall are the result of that push.
Although cities and water agencies that own sewer lines must write their own ordinances, the basic
requirements are the same. Most call for new restaurants to install grease interceptors or grease traps—
scaled-down versions of interceptors that sit above ground but aren't as efficient—while existing
restaurants are evaluated on a case-by-case basis.
Grease interceptors can cost anywhere from $5,000 to $40,000. Water from a kitchen sink flows into
underground tanks where grease floats to the top and food residue sinks to the bottom. A pipe at mid-
water level carries relatively grease-free water into the sewer.
Almost every city plans to issue annual permits to food establishments with fees ranging from $15 to
several hundred dollars to help pay for sewer upkeep.
The average Outback Steakhouse or Claim Jumper restaurant can generate 5,000 gallons of grease in a
month, said Ken Theisen, staff environmental scientist for the Santa Ana Regional Water Quality
Control Board.
"We're basically telling people we think grease-caused sewage spills are preventable, and they need to
prevent as many of them as they can," Theisen said.
Newport Beach has had an anti-grease ordinance in place for 10 years, but an even tougher law is set to
go before the City Council next month. Officials are asking the city's 375 restaurants to pay renewable
permit fees, with restaurants that have good track records getting discounts. The annual fees would
range from as little as $15 up to $800.
If a restaurant expands or changes its menu, owners might be required to install underground grease
tanks, said Assistant City Manager Dave Kiff. Restaurants that need a grease interceptor but don't have
the space will have to follow as many management practices as they can and pay annual fees of$700 to
$800.
City officials think restaurants are getting a fair offer.
"We're saying that the mom-and-pop restaurants that produce grease will still have to clean those pipes
somehow," Kiff said. Instead of having to spend$40,000 for an interceptor, he said, the city will charge
a restaurant $700 to $800 to help pay for added sewer maintenance. If a restaurant appears to be
following the rules and not producing much grease, the city "should lower the fees," Kiff said.
The California Restaurant Assn. is pleased that cities are willing to be flexible rather than simply forcing
every restaurant to install expensive grease interceptors.
"We had a choice. We could work with them or we could be part of the problem," said Andrew Casana,
http://www.latimes.com/news/local/state/la-me-grease2nov02,1,2311407,print.story?coll=l... 11/2/2004
Los Angeles Times: Cities Address Sticky Situation That Can Lead to Sewage Spills Page 3 of 3
regional representative for the association.To ensure compliance, cities are employing a variety of tools,
including the standard plumbers' snake and remote-controlled sewer cameras.
By looking at the pipes that connect a restaurant with the main sewer line, sanitation officers can tell if
restaurant employees are still pouring grease down the drain.
Standing in the kitchen of his restaurant one day last week, Marcheano said his staff had kept grease and
food away from the sink since he became owner in 1982.
A chef poured used oil from a frying pan into a bucket on the floor. A dishwasher emptied leftover food
into a large plastic garbage can. Inside the sink, a metal colander caught any chunks he missed while the
water passed through two more food debris filters under the sink.
The food and grease buckets, Marcheano said, are emptied several times a day into a special garbage bin
outside. He pays a contractor who specializes in grease-waste to empty that bin every two weeks. Good
management, Marcheano said,has kept him from having to call a plumber because of a grease blockage
for nearly a decade.
If you want other stories on this topic,search the Archives at latimes.comlarchives.
'I MSReprints
Article licensing and reprint options
Copyright 2004 Los Angeles Times
http://www.latimes.com/news/local/state/la-me-grease2novO2,1,2311407,print.story?coll=l... 11/2/2004
CALIFORNIA WATER ENVIRONMENT ASSOCIATION - CWEA
� r
IMP
rvine Ranch Water District cleanup of pollutants that would The next step will be determining
(IRWD) is moving forward otherwise flow to the bay and the which of the 31 sites will be designed
with the design of the first ocean. The natural "technology" and constructed first. Some of sites,
phase of the Natural Treatment used for this project has been used such as three existing basins within
System (NTS) project. The project successfully at the San Joaquin the Quail Hill area of Irvine and the
will use man-made wetlands to Marsh in Irvine, the Playa Vista existing flood control basin at
remove sediment, nutrients, patho- Wetlands in Los Angeles County Trabuco and Jeffrey Roads in Irvine,
gens and other contaminants from and other sites around the U.S. are expected to be planted with
dry weather runoff in the San Diego vegetation and be on line in 2005.
Creek Watershed and improve water Work on the design phase of the Work on other sites will take place
quality in Upper Newport Bay. project began following certification gradually over the next five years.
of the Draft Environmental Impact
The project is expected to be the Report by the Irvine Ranch Water IRWD has taken the lead on this
largest watershed-wide urban District Board of Directors in April project as a result of the success of its
retrofit project for runoff treatment 2004. The certification followed San Joaquin Marsh project in
in the nation. Wetlands plants such rigorous review of the DEIR and treating runoff from San Diego
as bulrush and cattails and the the project Master Plan. Work on Creek. In that project, water is taken
beneficial bacteria within the the federal certifications is now from San Diego Creek and allowed
wetlands soils provide natural being completed. to spend 7-10 days flowing through a
104 SARBS I October 2004 1 www.cwea.org/sarbs
Ali" A"'kAbL
bo WATER FLOW PATHOGEN PHOSPHOR NITROGEN
IY y
lri
't
series of ponds in constructed Loads (TMDLs), or limits of pollut-
wetlands on IRWD property. Over ants that can flow to Upper New-
half of the nitrates and tons of port Bay. While this project alone
phosphorus and sediment are re- will not solve all of the watershed's
moved during natural treatment. water quality problems, it is expect
ed to make significant strides
Initially, 71 possible sites within the toward meeting TMDL objectives
118-square mile watershed were stud- for San Diego Creek. .� m 61
ied during the master planning --i
1
process. The 31 best locations in More information about the NTS F_
terms of treatment effectiveness, project, including the full EIR and i ••. A. =�
constructability, land availability and Master Plan, is available online at
t
cost were selected for the project. w«-w.naturaltreatmentsystem.org. �' �'��4,,
The project has been developed in
consultation with the County of r._..o •M�--�r-
Orange and the cities within the
watershed, which face tough regula-
tions on Total Maximum Daily
ko
I www.cwca.org/sarbs October 2004 SARBS OS
F'
ORANGE COUNTY SANITATION DISTRICT
Hf0
PERIOD: October 1, 2004—October 31, 2004
TO: PDC Committee
FROM: David A. Ludwin, P.E.
Director of Engineering
STAFF CONTACT: Larry Rein
CONSTRUCTION PROGRESS
• Yorktown/Bushard Intersection:
o Completed installation of 15-inch City sewer siphon, 60-inch RCP, north junction
structure, and road restoration on north side of intersection. Work continues on
south half of the intersection: 12-inch water line replacement, fiber optic cable
installation and structure airline installation is to be completed. The estimated
completion of the south closure work is the last week of November, 2004
• Bushard between Banning and South Hamilton:
o Street restoration is nearly completed. Final asphalt cap and street striping is
pending until Verizon completes installation of a new communication cable at this
location. Discovered twelve cracked bells between Landfall and Hamilton, bell
cracks epoxy repairs are in progress. The estimated completion is the last week
of November, 2004.
• Bushard between North Hamilton and Panacea:
o Completed Hamilton street restoration on October 25, 2004. 109-inch pipe
installation continues north of Hamilton intersection. The estimated completion of
pipe installation is the week of November 15, 2004. The estimated completion of
the work including road restoration is the middle of December, 2004.
• Summary Progress to Date
0 108-inch Pipe: 6,444 ft of pipe have been installed. The alignment starts at Plant
No. 2 Main Entrance on Brookhurst and continues north on Brookhurst to
Banning, then turning west on Banning to Bushard, then turning north on
Bushard. Pipe has been installed up to the Waterfront/ Bushard intersection
(650-feet north of Hamilton/Bushard intersection)
o Intersection work: Work at the following intersections with Bushard has been
completed: Hamilton, Atlanta, Indianapolis, Adams, Yorktown (north side only)
and Fountain Valley Channel Crossing.
o City sewer work: 21/27-inch sewer was installed along Bushard between Banning
and Atlanta. An 8-inch sewer was installed on Cape May Drive.
o Plant No. 2 Work: Restoration of main entrance is completed and lining of
existing 54-inch pipe inside Plant No. 2 is completed.
o At the current rate of progress, project is projected to be completed in April,
2007.
TECHNICAL/PROBLEM SOLVING ISSUES:
• Submittals Reviews
o A revised submittal was received on September 8, 2004 for the balance of the
108-inch pipe. This design is a replacement for the previous design that earlier
pipe was manufactured to and OCSD said they would not accept for new pipe.
OCSD asked for additional information on September 13, 2004 and Rados
furnished a response to this request on September 17, 2004. OCSD requested
additional information and a response to questions on September 27, 2004. On
September 29, OCSD met with Rados and the pipe supplier and reached
agreement on what needed to be revised in the pipe submittal. This revised pipe
submittal was received October 6, and is under review.
o A revised submittal for the 96-inch RCP was received September 22, 2004. The
submittal is under review.
COMMUNITY OUTREACH/ PUBLIC CONCERNS:
• Construction Notifications
o Bushard closure from Hamilton to Panacea for two months - distributed
September 29, 2004 for road closure beginning October 2, 2004.
• Letters
o None
• Neighborhood Meetings
o None
• Weekly Updates (5)
o October 1, 2004
o October 8, 2004
o October 15, 2004
o October 22, 2004
o October 29, 2004
• Outreach Activities Summary to Date
o Seven community meetings
o Regular weekly web updates beginning July 2, 2004
■ The latest web update was October 29, 2004
0 35 notifications were sent.
• Approximately 97,000 pieces distributed
• Property Damage Complaints
o OCSD has received a total of 77 damage complaints. The complaints are being
reviewed and processed by AIG (Rados insurer at the time the alleged damage
occurred). David Morse &Assoc. has been hired by AIG as a third party adjuster
to determine the validity of the claims. To date no additional claims have been
settled or denied by AIG. David Morse is in the process of making second
inspections in order to make recommendations to AIG.
• Other Public Concerns Noted
o Dust Control: The Contractor has been directed continuously to mitigate dust at
the construction areas.
o The Contractor has been directed continuously to not start work prior to 7:00 a.m.
LEGAL ISSUES AND CONCERNS:
• Homeowner Claims
o 50 of the claimants are represented by legal counsel, Masry & Vititoe. Each of
these claims are for unspecified damages and is in the amount of 2 million
dollars.
• Liquidated Damages
o Overall project liquidated damages have been accruing from March 27, 2004 at
the rate of$2,000 per calendar day for a total of$426,000.
o Specific Site work liquidated damages were accrued for work on Adams Avenue
from December 8, 2003 until June 22, 2004 at$1,200 per calendar day for a total
of$237,600.
o Specific Site work liquidated damages were accrued for work on Hamilton
Avenue on October 14, 2004 at$1,000 per calendar day for a total of$1,000.
o There are actual delays that are allowable per contract that will reduce liquidated
damages. Staff was not able to reach an agreement with the Contractor on the
number of delay days; therefore staff will be requesting ratification of a unilateral
change order for the delays in December.
• Summary to Date of Legal Issues
o Rados has notified the District of claims for delay damages arising out of
problems with the 108-inch pipe and of claims from its subcontractors and
suppliers arising out of 108-inch pipe problems. The District has denied any
responsibility for such damages.
o Rinker has submitted a stop notice in the amount of$1,710,802 for 108-inch pipe
manufactured but not paid for by the District. Rados has submitted a stop notice
release bond covering 125% of Rinker's stop notice amount. Accordingly, the
District need not withhold any monies for the Rinker stop notice.
o Consultants
o The pipe consultant retained by the General Counsel's office continues to
assist staff and the General Counsel's office with technical issues and
liability questions.
o The geotechnical consultant retained by the General Counsel's office is
proceeding with its analysis of the dewatering and vibration study to
address allegations of damage to adjacent properties. The final report
will be made available to the public for review.
LR:
Orange County Sanitation District
.� Bushard Trunk Sewer Construction Project
Weekly Status Update — October 1 , 2004
O�
h iV�P
■ Installed 108-inch Pipe and
eos Completed Intersection Structures
Y
3 ® Current Construction Areas
ELLIS AV
Upcoming Construction Areas
FOun AIN PLANT FOR MORE INFORMATION
NO.' CALL CONSTRUCTION
HOTLINE (714) 378-2965
GARFIELO AV
Bass Or
Current Yorktown/Bushard
Installation of 60-inch Pipe.
YORKT , AV
Estimated start:September 27,2004.
in N
g H Bushard St.fully closed between Mid-Yorktown Ave
i and Pettswood Dr Intersection.
Pettswood or Y
a O
o
m
ADAMS AV
INDIANAPOLIS AV
W Upcoming 108-inch Installation
Installation of 108-inch pipe.
U
W
Estimated Start:October 4,2004.
m
Bushard St.will be fully closed between Mid-
ATLANTAAV Hamilton Ave and Panacea Dr Intersection.
Current Hamilton/Bushard Intersection Work
Panacea or Installation of 108-inch pipe and removal and
replacement of 12-inch waterline.
H -ON AV
Estimated Completion:October 4,2004.
[BANNING
rumbeat or South Closure:Construction will occur
on the South side of Hamilton/Bushard intersection.
Bushard fully closed between Drumbeat Drive and
South-Hamilton Avenue intersection.Traffic on
V Hamilton Ave was restored,but closure remains.
A
gC��iC
CO
ASTy� OCSD
Gy PLANT
�4 NO.2
Orange County Sanitation District
Bushard Trunk Sewer Construction Project
Weekly Status Update ! October 22, 2004
rrd. IF aV-!�P
® Installed 108-inch Pipe and
40 Completed Intersection Structures
SFW
r
a
Current Construction Areas
ELLIS AV
w Upcoming Construction Areas
° 'D
F OIJN AiN PLANT FOR MORE INFORMATION
NO.1 CALL CONSTRUCTION
HOTLINE (714) 378-2965
GARFIE'_D AV
YORKTOWN AV Current Yorktown/Bushard
a � N Installation of 60-inch Pipe.
°z 1_'t Start: September 27,2004.
Pettswood Dr =
a o Estimated Completion:Last week of November, 2004
o
m Bushard St. fully closed between Mid-Yorktown Ave
ADAMS AV and Pettswood Dr Intersection.
INDIANAPOLIS AV
ATLANTA AV
Panacea Dr
HAMILTON AV
Current Hamilton/Bushard
Installation of 108-inch pipe.
Start: October 4,2004.
Estimated Completion:Second week of December,2004
BANNING v Bushard St.fully closed between Mid-Hamilton Ave and
Panacea Dr Intersection.
Traffic on Hamilton will be restored Monday October 25,
A
2004, but closure will remain from North-Hamilton
�Cc Avenue and Panacea Dr intersection.
4STfU OCSD - -. --- -
Cy PLANT
W' NO.2
yty "A 11T•i Ti
Orange County Sanitation District
U -
P Bushard Trunk Sewer Construction Project
Weekly Status Update — October 29, 2004
�'��y4 rME cNy a�v
Installed 108-inch Pipe and
aoSF Completed Intersection Structures
wy
Current Construction Areas
ELLIS AV
Upcoming Construction Areas
OcSD
PLANT FOR MORE INFORMATION
NO i CALL CONSTRUCTION
HOTLINE (714) 378-2965
GARFIELD AV
YORKTONJN AV Current Yorktown/Bushard
N n Installation of 60-inch Pipe.
a Start: September 27,2004.
_ D Estimated Completion: Last week of November,2004
Pettswood Dr x
a Y Bushard St.fully closed between Mid-Yorktown Ave
00 and Pettswood Dr Intersection.
m
ADAMS AV
INDIANAPOLIS AV
w
i
a
x
U
r
(Y
W
m
ATLANTA AV
Panacea Dr
AV _
Current Hamilton I Bushard
Installation of 108-inch pipe.
Start: October 4,2004.
Estimated Completion: Second week of December, 2004
Bushard St.fully closed between North-Hamilton Ave and
Panacea Dr Intersection.
BANNING V
A
7C�FiC
CO
4ST OCSD
yTCy PLANT
h4 NO 2
AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
November 17, 2004 — 7:00 P.M.
Agenda Posting: In accordance with the requirements of California Government Code Section
54954.2, this agenda has been posted in the main lobby of the District's Administrative offices not
less than 72 hours prior to the meeting date and time above. All written materials relating to each
agenda item are available for public inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to
the Board for discussion and/or action. it will be done in compliance with Section 54954.2(b) as an
emergency item or because there is a need to take immediate action, which need came to the
attention of the Board subsequent to the posting of agenda, or as set forth on a supplemental
agenda posted in the manner as above, not less than 72 hours prior to the meeting date.
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible.
If you require any special disability related accommodations, please contact the Orange County
Sanitation District Board Secretary's office at (714) 593-7130 at least 72 hours prior to the
scheduled meeting. Requests must specify the nature of the disability and the type of
accommodation requested.
Items Continued: Items may be continued from this meeting without further notice to a Committee
or Board meeting held within five (5) days of this meeting per Government Code Section
54954.2(b)(3).
Meeting Adjournment: This meeting may be adjourned to a later time and items of business from
this agenda may be considered at the later meeting by Order of Adjournment and Notice in
accordance with Government Code Section 54955 (posted within 24 hours).
1. Invocation and Pledge of Allegiance
2. Roll Call
3. Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, if any. (See listing in Board Meeting folders)
4. Appointment of Chair pro tem, if necessary
11/17/04
Page 2
5. Public Comments: All persons wishing to address the Board on specific agenda items or
matters of general interest should do so at this time. As determined by the Chair,
speakers may be deferred until the specific item is taken for discussion and remarks
may be limited to three minutes.
Matters of interest addressed by a member of the public and not listed on this agenda
cannot have action taken by the Board of Directors except as authorized by Section
54954.2(b).
6. The Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors.
a. Report of Chair, consideration of Resolutions or commendations,
presentations and awards
b. Report of General Manager
C. Report of General Counsel
1. Receive and file General Counsel's 2004 Litigation Status Report.
7. If no corrections or amendments are made, the minutes for the regular meeting held on
October 27, 2004 will be deemed approved as mailed and be so ordered by the Chair.
(Minutes to be distributed at 11/17104 Board Meeting.)
8. Ratifying payment of claims of the District, by roll call vote, as follows:
ALL DISTRICTS 10/15/04 10/31/04
Totals $7,664,711.58 $11,569,193.59
DIRECTORS: Pursuant to Government Code Section 84308, you are required to disclose
any campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving OCSD. This requires that you identify the contributor by name.
Further, you may not participate in the decision making process to award a contract to such
party. For reference. you are directed to the Register of Warrants as to all current
contractors/vendors with OCSD. For the specifics of Government Code Section 84308,
please see your Director's Handbook or call the office of General Counsel.
11/17/04
Page 3
CONSENT CALENDAR
All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the
Consent Calendar by a Director, staff member or member of the public in attendance. there will
be no separate discussion of these items. All items on the Consent Calendar will be enacted
by one action approving all motions, and casting a unanimous ballot for resolutions included on
the consent calendar. All items removed from the Consent Calendar shall be considered in the
regular order of business.
Members of the public who wish to remove an item from the Consent Calendar shall, upon
recognition by the Chair, state their name, address and designate by number the item to be
removed from the Consent Calendar.
The Chair will determine if any items are to be deleted from the Consent Calendar.
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same. as follows:
a. (1) Receive and file petition from Rene Bollen requesting annexation of 1.30
acres to Orange County Sanitation District, in the vicinity of Randall Street and
Meads Avenue, in an unincorporated area of Orange County: and.
(2) Adopt Resolution No. OCSD 04-27, authorizing initiation of proceedings to
annex said territory to OCSD (Proposed Annexation No. OCSD-45 — Bollen
Annexation).
b Ratify the purchase of an easement from the County of Orange Resources
Management Development Department for the Effluent Pump Station Annex, Job
No. J-77. in an amount not to exceed $7.500. in a form approved by General
Counsel.
END OF CONSENT CALENDAR
10. Consideration of items deleted from Consent Calendar. if any.
11/17/04
Page 4
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE
Consent Calendar
a. Order draft Steering Committee Minutes for the meeting held on October 27,
2004 to be filed.
Non-Consent Calendar
b. Review and consideration of agenda items considered by the Steering
Committee re the November 17, 2004 meeting.
C. Consideration of items deleted from Steering Committee Consent Calendar, if
any.
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
OMTS Consent Calendar
a. Order draft Operations, Maintenance and Technical Services Committee Minutes
for the meeting held on November 3. 2004 to be filed. (Minutes to be distributed
at 11/17104 Boarcl Meeting.)
b. Approve Amendment No. 2 to the Consulting Services Agreement with Brown
and Caldwell Consulting, providing for additional consulting services in
connection with the Santa Ana Regional Water Quality Control Board's newly
adopted Waste Discharge Requirements. for an additional amount of $730.000 to
include a $100.000 contingency. increasing the total amount not to exceed
$1.430.000 for the time period of January 1, 2005 thru December 31. 2005.
C. Approve Memorandum of Understanding with South Orange County Wastewater
Authority for Phase 1 of the South Orange County Composting Facility for an
amount not to exceed $69,637. to be shared equally with South Orange County
Wastewater Authority, in a form approved by General Counsel.
OMTS Non-Consent Calendar
d. Consideration of items deleted from OMTS Committee Consent Calendar, if any
13. PLANNING. DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. Order draft Planning. Design and Construction Committee Minutes for the
meeting held on November 4. 2004 to be filed. (Minutes to be distributed at
11/17104 Board Meeting.)
11/17/04
Page 5
b. Ratify Change Order No. 5 to Warner Avenue Relief Sewer, Contract No. 11-22,
with ARB, Inc., authorizing a deduction of$308,378, decreasing the total contract
amount to $5,198.580.
C. Ratify Change Order No. 1 to Gisler-Redhill Trunk Improvements. Reach "A".
Contract No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-
Redhill/North Trunk Improvements, Contract No. 7-41; and City of Tustin Project
Nos. 6106 and 6151. with ARB. Inc.. authorizing an addition of $349.612 and 20
calendar days, increasing the total contract amount to $18,725,611.
d. Ratify Change Order No. 10 to Bushard Trunk Sewer Rehabilitation, Job
No. 1-2-4, with Steve P. Rados, Inc., authorizing an addition of $242,360,
increasing the total contract amount to $31,911,805.
e. Approve Professional Services Agreement with Malcolm Pirnie. Inc. for
preparation of a Preliminary Design Report for the Coast Trunk Sewer
Rehabilitation, Contract No. 11-26. for an amount not to exceed $2,219,330.
f. Approve Amendment No. 2 to the Professional Services Agreement with Camp,
Dresser & McKee for Rehabilitation of Odor Control Facilities. Job No. J-71-8.
providing for modifications to the scope of work for an additional amount of
$645.674, increasing the total amount not to exceed $4.220.881.
g. Approve Amendment No. 7 to the Professional Services Agreement with Boyle
Engineering Corporation for Bushard Trunk Sewer Rehabilitation. Job No. 1-2-4,
providing for additional engineering construction support services for an
additional amount of $326,509. increasing the total amount not to exceed
$2,345,920.
h. Approve Amendment No. 1 to the Professional Services Agreement with Fluor
Enterprises. Inc. for Electrical Equipment Refurbishment and Protection. Job No.
SP-81, providing for additional engineering services for an additional amount of
$128,549, increasing the total amount not to exceed $214,049.
i. Approve Professional Services Agreement with Black & Veatch Corporation to
provide an Energy Master Plan for the Treatment Plant Strategic Plan Update.
Job No. J-102, for an amount not to exceed $1,894,660.
PDC Non-Consent Calendar
j. Concur with Staff recommendation to: (1) Revise the 1999 Strategic Plan Year
2020 flow projection for treatment capacity to provide 13 million gallons per day
(mgd) of capacity for the Santa Ana River Watershed Project Authority:
(2) Design Plant No. 1 Secondary Treatment Expansion, Job No. P1-102, for a
first phase capacity of 60 mgd. with provisions to expand to 80 mgd in the future;
and,
(3) Establish a policy regarding the two contract agencies served by Orange
County Sanitation District (OCSD), such that OCSD plans, designs, and
constructs new facilities based on the adopted plans of the agency.
J
11/17/04
Page 6
k. Consideration of items deleted from PDC Committee Consent Calendar, if any
14. FINANCE, ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHR)
FAHR Consent Calendar
a. Order draft Finance. Administration and Human Resources Committee Minutes
for the meeting held on November 10, 2004 to be filed. (Minutes to be distributed
at 11/17104 Board Meeting.)
b. Receive and file Treasurer's Report for the month of October. 2004.
C. Receive and file the Quarterly Investment Management Program Report for the
period July 1, 2004 through September 30, 2004.
d. Receive and file the 2004-05 First Quarter Financial Report for the period ending
September 30, 2004.
e. Receive and file the SWAP Report for the quarter ended September 30, 2004.
f. Adopt Resolution No. OCSD 04-28. Amending Resolution No. OCSD 98-33..
Amending Human Resources Policies and Procedures Manual, providing for:
(1) Approve the reclassification of one Public Information Specialist position to
Senior Public Information Specialist at pay range 76 ($5,266 — $6,582): and.
(2) Approve the reclassification of one Associate Engineer III to Engineer at pay
range 84 ($6,415 — $8,018); and,
(3) Approve the upgrade of one Senior Engineer position to Engineering
Supervisor at pay range 92 ($7,817 — $9.771): and.
(4) Approve the pay range placement of the Director of Communications and
Administrative Services at pay range 101 ($7,557 — $11,336).
g. Approve a one time only non-base building payment for the Director of Technical
Services in an amount not to exceed $7.948 for his service as Acting General
Manager.
h. Authorize the General Manager to solicit Requests for Proposal and
subsequently award a Consultant Services Agreement for Phase 2 of the
Corporate Identity and Public Awareness Project, Specification
No. CS-2003-16213D, in an amount not to exceed $20,000.
i. Receive and file FY 03/04 Comprehensive Annual Financial Report.
FAHR Non-Consent Calendar
j. Consideration of items deleted from FAHR Committee Consent Calendar, if any.
11/17/04
Page 7
NON-CONSENT CALENDAR
15. Ordinance No. OCSD-24, An Ordinance of the Board of Directors of Orange County
Sanitation District, Adopting Revised Table G re Permittee Charges for Use and
Reaffirming All Other Charges:
"An Ordinance of the Board of Directors of Orange County Sanitation District
Establishing Sanitary Sewer Service Charges; Establishing Capital Facilities
Capacity Charges; Adopting Miscellaneous Charges and Fees relating to
Industrial Charges. Source Control Permittees and Wastehaulers; and Repealing
Ordinance No. OCSD-22".
a. Open meeting
1. Receive and file written comments, if any
2. Verbal report of Director of Finance
3. Verbal report of General Counsel
4. Directors' questions
5. Public comments
b. Close meeting
C. Discussion by Board of Directors
d. Recommended actions:
1. Motion to read Ordinance No. OCSD-24 by title only and waive reading of
said entire Ordinance. (The waiver of the reading of the entire Ordinance
must be adopted by a unanimous vote of Directors present.)
2. Motion to adopt Ordinance No. OCSD-24, Adopting Revised Table G re
Permittee Charges for Use and Reaffirming All Other Charges, An
Ordinance of the Board of Directors of Orange County Sanitation District
Establishing Sanitary Sewer Service Charges: Establishing Capital
Facilities Capacity Charges; Adopting Miscellaneous Charges and Fees
relating to Industrial Charges, Source Control Permittees and
Wastehaulers; and Repealing Ordinance No. OCSD-22 (Requires two-
thirds affirmative vote of the Board of Directors).
16. Ordinance No. OCSD-25, An Ordinance of the Board of Directors of Orange County
Sanitation District. Adopting Fats, Oils and Grease Control Regulations Applicable to
Food Service Establishments in the Tustin area:
a. Open meeting
1. Receive and file written comments, if any
2. Verbal reports of staff
11/17/04
Page 8
3. Directors' questions
4. Public comments
b. Close meeting
C. Discussion by Board of Directors
d. Recommended actions:
1. Motion to read Ordinance No. OCSD-25 by title only and waive reading of
said entire ordinance. (The waiver of the reading of the entire ordinance
must be adopted by a unanimous vote of Directors present.)
2. Motion to adopt Ordinance OCSD-25, An Ordinance of the Board of
Directors of Orange County Sanitation District. An Ordinance of the Board
of Directors of Orange County Sanitation District, Adopting Fats. Oils and
Grease Control Regulations Applicable to Food Service Establishments.
17. Closed Session
CLOSED SESSION: During the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations, pending or
potential litigation, or personnel matters. pursuant to Government Code Sections
54956.8, 54956.9, 54957 or 54957.6, as noted.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or
potential litigation: (c) employment actions or negotiations with employee
representatives: or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted closed
session and are not available for public inspection. At such time as the Board takes
final action on any of these subjects, the minutes will reflect all required disclosures
of information.
a. Convene in closed session, if necessary
1. Confer with General Counsel re pending litigation. Santa Ana Watershed
Project Authority v. Orange County Sanitation District. Orange County
Superior Court Case No. 04CC06197, Government Code Section
54956.9.
2. Confer with General Counsel re pending litigation, Orange County
Sanitation District v. Santa Ana Watershed Protect Authority. Orange
County Superior Court Case No. 04CC0l 1345, Government Code
Section 54956.9.
3. Confer with General Counsel - Anticipated Litigation. Government Code
Section 54956.9(c): One (1) matter.
11/17/04
Page 9
4. Convene in closed session to confer with District's Negotiator, Blake P.
Anderson, General Manager, re Executive Management Team
Compensation and Benefit Percentage Adjustment (Government Code
Section 54957.6).
b. Reconvene in regular session
C. Consideration of action, if any, on matters considered in closed session
18. Matters which a Director may wish to place on a future agenda for action and
staff report.
19. Other business and communications or supplemental agenda items, if any
20. Future Meeting Date: The next Board of Directors regular meeting is scheduled for
December 15, 2004, at 7:00 p.m.
21. Adjournments
................................................................................................................................................................................................................................................................................_.....-
NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the Board of
!Directors, items shall be submitted to the Board Secretary no later than the close of business 14 days
:preceding the Board meeting. The Board Secretary shall include on the agenda all items submitted by
:Directors, the General Manager and General Counsel and all formal communications.
'General Manager Blake Anderson (714)593-7110 banderson(a)ocsd.com
t
Board Secretary Penny Kyle (714) 593-7130 pkyle(a-)ocsd.com =.
:Director/Engineering David Ludwin (714) 593-7300 dludwin a(�ocsd.com
:Director/Finance/Treasurer Gary Streed (714) 593-7550 gstreed(c-�ocsd.coin
:Director/Human Resources Lisa Tomko (714) 593-7145 Itomko(aDocsd.com
:Director/Information Technology Patrick Miles (714) 593-7280 pmiles(aocsd.com
Director/Operations&
Maintenance Bob Ooten (714) 593-7020 rooten(a)ocsd.com
:Director/Technical Services Bob Ghirelli (714) 593-7400 rghirelli(a�ocsd.com
Director/Communications&
:Administrative Services Carol Beekman (714) 593-7120 cbeekman(cDocsd.com
:General Counsel Thomas L.Woodruff 714 564-2605 tiv✓awss-law.com
......................................................................... ...............................................5.........1................................ ��.._—��, .....,...........................................
H:\dept\agenda\Board Agendas\2004 Board Agendas\111704 agenda.doc
The Minutes of the regular meeting held
by the Board of Directors on October 27,
2004 were not available for this mailing .
These minutes will be distributed at the
November 17, 2004 Board of Directors
meeting . Once the minutes are
finalized, they will also be available on
the District's website (www.ocsd .com).
BOARD OF DIRECTORS Meeting Date To Bd.of Dir.
11/17/04
AGENDA REPORT Item Number Item Number
8
Orange County Sanitation District
FROM: Gary Streed, Director of Finance/Treasurer
Originator: Lenora Crane. Executive Assistant
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
CONFLICT OF INTEREST NOTIFICATION
Pursuant to Government Code Section 84308, you are required to disclose any campaign
contribution greater than $250 received in the past twelve months from any party to a contract
involving the Orange County Sanitation District. Further, you may not participate in the decision
making process to award a contract to such party.
For reference.. you are directed to the Register of Warrants as to all current contractors/vendors
with the District.
In general, YOU must disclose the basis of the conflict by identifying the name of the firm or
individual who was the contributor.
For the specifics of Government Code Section 84308, please see your Director's Handbook or
call the office of General Counsel.
SUMMARY
See attached listing.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ATTACHMENTS
1. Copies of Claims Paid reports from 10/01/04 — 10/15/04 and 10/16/04 — 10/31/04
H.\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1104\Item 8.Claims Paid.doc
Revised 06/04/03
a
Claims Paid From 10/01104 to 10116104
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
65647 ADS Environmental Services,Ina E 67,161.39 Professional Services-J-73.2
66648 Black&Veatch Corporation 464,254.74 Engineering Services P1-76,P1-102,P2-85&5-68
65549 Brown&Caldwell 174,946.37 Professional Services 1132-90
65550 Bush&Associates,Ina 58,088.00 Professional Services 7-23,7-39,7-41 &11-22
66661 Certified Truck Bodies 26,937.50 Purchase&Installation of(1)Custom Service Truck Body
65552 Clemson University 29,153.06 Training Registration
65553 Electra-Band,Inc, 28,716.37 Epoxy Costing of Truck Loading Auger&Mier. Parts&Accessories
65554 Hill Brothers 343353.40 Chemicals-Odor&Corrosion Control-Newport Trunkline
65555 IPMC clo Parsons 947,434.00 Professional Services-Integrated Program Management
65556 JPL Compressor Service, Ina 62,422.19 Repair/Repl. Camshaft Lobes on#2 Engine,Pit. 1 Can Gen;and Overhaul#4 Engine,Pit.2
65557 Kemiron Companies, Inc. 84,101.07 Ferric Chloride MO 9-27-95
66668 Lee&Ro, Ina 144,039.84 Professional Services 5-61 &5-52
65659 Ninyo&Moore Corporate Accounting 39,616.93 Professional Services-Materials Teeting,Inspection&Geotechnical Engrg.
66560 Pioneer Americas,Ina 231,256.66 Sodium Hypochlorite
65661 Pciydyne,Ina 75,452.54 Cationic Polymer MO 3-11-92
65552 S. S. Mechanical Corp. 27,534.80 Const.-Remove/Replace 2e0'of Seamless Carbon Steel Piping,Valves&Pipe Insulation
65563 Sencon Engineering,Inc. 32,450.00 Ccnstrucficn-Manhole Rehabilitation Program
65564 Southern California Edison 79,084.98 Power
65555 SPEC Services,Ina 46,845.26 Engineering Services J-33-1,SP-94
66666 SPS Technologies 38,842.30 Reoondliation User Fee Refund Program
65567 Tran Consulting Engineers 52,083.60 Engineering Services 7-21
66568 Tule Ranch/Megan Farms 238,569.01 Residuals Removal MO 3-29-95
66569 U.S.Metro Group,Ina 26,785.00 Janitorial&Floor Maintenance at Plants 1 &2
66670 U.S.Peroxide,L.L.C. 143,464.86 Odor&Corrosion Control Treatment for Coll. Sys.;Hydrogen Peroxide&Ferrous Chloride
65571 Waste Markets Corp. 42,645.02 Maint.Agreement-Grit&Screenings Removal&Digester Bed Met'l. Removal
65572 Yale/Chose Materials Handling,Ina 130,513.46 (16)Taylor Dunn Electric Carts
66573 ARB, Inc 43,969.58 Construction 11-22
65574 Mike Prlic h&Sans 200,956.01 Construction 6-13-3&7-23-1
65575 Steve P Rados,Ina 327,722.40 Construction 1-2-4
65576 Union Bank of California 36.413.60 Construction 1-2-4,Retention
65577 A-Cal(Assam Calibration,Inc.) 200.00 Calibration of Instrumentation for Bushard Sewer Project
65578 Able Scale Repair 660.00 Ouarteriy Scale Inspection&Certification
65579 Absolute Standards,ina 405.00 Lab Parts&Supplies
66680 Ace Ergonomics 42.56 Ergonomic Foot Rest
66581 Acroburr Inc#2 209.68 Reconciliation User Fee Refund Program
65582 Agilent Technologies,Inc 88.64 Lab Parts&Supplies
65583 Air Industries Corporation 1,937.25 Reconciliation User Fee Refund Program
65564 Air Industries 5,611.64 Reconciliation User Fee Refund Program
65585 Airges Safety,Inc 2,64%06 Safety Supplies
65585 Alfs-Leval,Ina 2,997.75 Electrical Parts&Supplies
65587 Alhambra Foundry Co.,Ltd. 2,267.90 Manhole Frames&Covers
65508 Allied Pacific Metal Stamping 1,900.80 Reconciliation User Fee Refund Program
66589 Allay Die casting 1,289.30 Reconciliation User Fee Refund Program
65590 Aluminum Forge 826.77 Reconciliation User Fee Refund Program
65591 Amcor-Sundipse,Ina 5,999.06 Reconciliation User Fee Refund Program
65592 American Payroll Association 166.00 Membership
H:ldept1Rn52101CRANEtiFAHRIFAHR2M1NOVEMBER%Oalms Paid Repot-101504A5 EXH I BIT A
tln►21011c Page 1 of 11 1142004
Claims Paid From 10/01/04 to 10116104
Warrant No. Vendor Amount Rescrlptlon
65593 American Water Works Assoc/Water Qualty 655.00 Lab Administration/Quality Assurance Division Meeting Registration
65594 Amerimax Building Products,Inc. 1,379.67 Reconciliation User Fee Refund Program
65695 Ametek Aerospace 659.44 Reconciliation User Fee Refund Program
66696 Amrican Air Filter,Inc. 1,481.05 Filters
65597 Anaheim Extrusion Co.,Inc 788.00 Reconciliation User Fee Refund Program
65598 Anaheim General Hospital 5,373.58 Reconciliation User Fee Refund Program
65599 Aqua-Con 823.54 Reconciliation User Fee Refund Program
65600 Aquarium Doctor 105.44 Human Resources Aquarium Service
65601 Arrowhead Products 9,891.29 Reconciliation User Fee Refund Program
65602 Autodeak University/Enterprise Events 1,295.00 Training Registration
65603 Awards&Trophies Company 147.22 Plaques&Awards
65604 AMSA 450.00 Training Registration
65605 API Fund For Payroll Education, Inc 78.00 Training Registration
66606 APW Enclosure Systems 4,978.93 Reconciliation User Fee Refund Program
65607 APW Enclosure Systems,L.L.C. 3,329.71 Reconciliation User Fee Refund Program
65608 ARO Services 270.33 Reconciliation User Fee Refund Program
65609 American Telephone&Telegraph Corp. 1,127.01 Telephone Conference Services
65610 American Telephone&Telegraph Corp. 93.21 Telephone Service
65611 AT&T Wireless Services 3,415.31 Wireless Phone Services
65612 AWSI 206.00 Department of Transportation Program Management&Testing
65613 Basic Chemical Solutions,L.L.0 10,666.32 Sodium Bisulfite
66614 Basic Electronics, Ina 139.73 Reconciliation User Fee Refund Program
65615 Battery Specialties 364.24 Batteries
66616 Baez Houston Co. 1,026.59 Reconciliation User Fee Refund Program
65617 Bearing Inspection,Inc 1,141.24 Reconciliation User Fee Refund Program
65610 Beckman Coulter,Inc 10,517.85 Reconciliation User Fee Refund Program
65619 Bermingham Controls 519.97 Valves
65620 BloMerleux Vitek,Inc. 4,060.96 Lab Parts&Supplies
65621 Bodycote Lindberg Corp. 324.64 Reconciliation User Fee Refund Program
65622 Boeing-Anaheim 16,933.10 Reconciliation User Fee Refund Program
65623 Boeing Company,The 6,926.93 Reconciliation User Fee Refund Program
65624 Boiler and Steam Parts.com 975.00 Valves
65625 Brasstech,Inc. 5,617.55 Reconciliation User Fee Refund Program
65626 Brea Community Hospital 7,848.97 Reconciliation User Fee Refund Program
65627 Bridgemark Corporation 16.40 Reconciliation User Fee Refund Program
65628 Bristol Industries 2,691.39 Reconciliation User Fee Refund Program
65629 Burlington Engineering,Inc 1,207.70 Reconciliation User Fee Refund Program
65630 BAF Industries 1,781.19 Reconciliation User Fee Refund Program
65631 BI Technologies 3,319.04 Reconciliation User Fee Refund Program
65632 Cal-Glass,Inc 84.32 Lab Equipment Repairs
65633 California Auto Collision 564.56 Repairs to Vehicle 408
66634 California Relocation Services,Ina 187.50 Office Files Moving/Relocation Services
65635 CWEA-Membership 97.00 Membership
65636 Cambridge Isotope Labs 3,491.10 Lab Parts&Supplies
65637 Cambro Manufacturing 3,364.03 Reconciliation User Fee Refund Program
65638 Cannon Equipment West 763.72 Reconciliation User Fee Refund Program
65639 Caren Precision Engineering 2,070.50 Reconciliation User Fee Refund Program
H:\deptlEnW MCRANEiFAHR4FAHR20041NOVEMBERkOsime Psld Report-101604.3de EXHIBIT A
enn1(Mc Page 2 of 11 111a/2004
Cl alms Paid From 10101104to 10/16104
Warrant No. Vendor Amount Description
65640 Casual Gourmet 166.24 Meeting Expense-P2-79
66641 Catalina Cylinders 1,162.38 Reconciliation User Fee Refund Program
65642 Center for Creative Growth 2,500.00 Professional Services-0&M Management Coaching
65643 Central Powder Coating 1,040.04 Reconciliation User Fee Refund Program
65544 Chapman Hospital 2,667.58 Reconciliation User Fee Refund Program
65645 Circuit Tech, Inc. 17.16 Reconciliation User Fee Refund Program
65646 Cale-Parmer Instrument Co. 277.32 Lab Parts&Supplies
65647 Comm Vault Systems,Inc. 8,373.37 Annual Support&Maintenance for NOMP&Galaxy Software
65M Component Services International,L.L.C. 514.90 Toshiba Circuit Board Repairs
66649 Consolidated Elect. Distributors,Inc 1,710.40 Electrical Parts&Supplies
66650 Consumers Pipe&Supply Co. 277.18 Plumbing Supplies
65651 Cooper Camercn Corporation 1,670.61 Engine Supplies
65652 Corporate Express 3,176.14 Office Supplies
65653 Cortech Engineering 1,564.38 Pump Supplies
65664 County Wholesale Electric Co. 156.88 Electrical Parts&Supplies
65655 Criterion Machine Works 1,353.65 Reconciliation User Fee Refund Program
65656 Crockett Container Corp. 8,373.01 Reconciliation User Fee Refund Program
65657 Custom Enamelers,Inc 454.65 Reconciliation User Fee Refund Program
65658 COW Government,Inc. 297.41 Software Support&Maintenance
65659 CEM Corporation 241.00 Lab Parts&Supplies
65660 CEPA Company 1,220.00 Lab Equipment Maintenance&Certification-Fume Hoods
65661 CH2MHi11 7,267.23 Engineering Services J-40-7
65662 CMAA 225.00 Training Registration
66M CSI Ccmputdonal Systems 4,487.00 Training Registration
65W Dapper Tire Co. 367.42 Truck Tires
65665 Date Aire, Inc. 1,764.16 Reconciliation User Fee Refund Program
65666 Data Solder,Inc 61.74 Reconciliation User Fee Refund Program
66667 David's Tree Service 275.00 Tree Msint. Service
65668 Oecor Metal Finishing,Inc 812.611 Reconciliation User Fee Refund Program
65669 Delphi Automotive Systems,L.L.C. 10,925.80 Reoondlisticn User Fee Refund Program
65670 Derm Cosmetic Labs,Ina 408.20 Reconciliation User Fee Refund Program
M71 Detection Instruments Corporation 435.21 Instrument Repairs&Calibration-Oda Lags
65672 E.I. Ou Pont De Nemours and Company 18,686.00 Painting Maint. Services MO 4-22-98
65673 Ducommun Aerastructurea 3,122.60 Reconciliation User Fee Refund Program
65674 Dunn-Edwards Corporation 46.98 Paint Supplies
66675 DGA Consultants,Inc. 11,503.00 Professional Services-CCTV Data Evaluation&Support
65676 Eaton Corporation/MSC Products 1,125.99 Reconciliation User Fee Refund Program
65677 Edinger Medical Group,Ina 615.00 Medical Screenings
66678 Electro Metal Finishing Corp. 95.06 Reconciliation User Fee Refund Program
65679 Employers Group 312.26 Training Registration
65660 Enchanter, Inc. 4,500.00 Ooeen Monitoring&Outfall Inspection&Maintenance
65681 Engravers Ink Company 38.72 Reconciliation User Fee Refund Program
65682 Essex Electric,Ina 2,377.42 Reconciliation User Fee Refund Program
65683 Excel Door&Gate Company,Ina 850.05 Installation of Receiver and Provide 2 Remote Transmitters for Ellis Gate Entrance
65664 Exquisite Design 43.60 Reconciliation User Fee Refund Program
65685 ENS Resources, Inc, 10,002.41 Professional Services-Legislative Advocate
05686 ESRI, Inc. 1,570.00 Training Registration
Wdept1Rn12101CRANETAHRIFAHR2004140VEMSEMQalms Paid Report-101604.ids EXHIBIT A
tinr21011a Page 3 of 11 1118/2004
Claims Paid From 10101/04to 10/16/04
Warrant No. Vendor Amount Description
65687 Fabrication Concepts Corporation 2,499.18 Reconciliation User Fee Refund Program
65688 FedEx Corporation 766.10 Freight Services
65669 First American Real Estate Solutions 2,600.00 On-Line Orange County Property Information
65690 Five Star Metals,Ina 358.40 Mechanical Parts&Supplies
65691 Foodcraft Coffee&Refreshment Services 735.93 Meeting Supplies
65692 Fountain Valley Rancho Hand Wash 841.70 Trudy Wash Tickets or Gasoline
65693 Franklin Covey 163.78 Office Supplies
65694 Pryor Seminars/Career Track 199.00 Training Registration
65695 Frederick Pump&Engineering 290.18 Pump Parts&Supplies
65696 Fry's Electronics 14.00 Computer Supplies
65697 Fullerton Plating 1,256.28 Reconciliation User Fee Refund Program
M98 G.F.0.A 285.00 Training Registration
65699 Ganahl Lumber Company 131.99 Repairs&Maintenance Materials
65700 General Container Corp. 471.44 Reconciliation User Fee Refund Program
65701 George Yardley Co. 1,392.13 Solenoid Valve
65702 Georgia Pacific 5,697.92 Recondlistlon User Fee Refund Program
65703 Gilmour Group clo Lippincott Co. 1,130.84 Hoses
65704 Goldenwest Window Service 470.00 Window Cleaning Service-Spar.#990015
65705 Gamtech Electronics 208.33 Reconciliation User Fee Refund Program
65706 Gorilla's Polishing and Plating Corp. 132.20 Reconciliation User Fee Refund Program
65707 Government Finance Officers Association 50.00 Subscription
65708 Grainger,Ina 2,286.65 Mechanical Parts,Supplies&Tools
65709 Graybar Electric Company 4,978.75 Electrical Parts,Supplies&Repairs
65710 Great Western Sanitary Supplies 234.16 Lab&Janitorial Supplies
65711 H Koch&Sons 3,665.60 Reconciliation User Fee Refund Program
65712 Hach c/o Pcnten Industries 142.44 Lab Parts&Supplies
65713 Hamilton Materials 1,227.63 Reconciliation User Fee Refund Program
65714 Harbor Truck Bodies,Inc. 700.00 Reconciliation User Fee Refund Program
65715 Harold Primrose Ice 55.50 Ike For Samples
65716 The Hartwell Corporation 412.26 Reconciliation User Fee Refund Program
65717 Health Dimensions 800.00 Employee Health Fair
65718 Health Science Associates 3,706.80 Professional Services-Asbestos Study
65719 Hightower Plating&Manufacturing Co. 748.39 Reconciliation User Fee Refund Program
65720 Home Depot 349.36 Misa Repair&Maintenance Material
65721 Hopkins Technical Products 1,082.13 Pump Supplies
65722 Horizon Technology 1,149.11 Lab Parts&Supplies
65723 Hub Auto Supply 281.16 Vehicle Parts&Supplies
65724 City of Huntington Beach 34.85 Water Use
65725 Hyatt Die Casting&Engineering Corp. 1,485.29 Reconciliation User Fee Refund Program
65726 HI Standard Automotive 195.44 Automotive Parts&Supplies
65727 Independent Forge Co. 90.23 Reconciliation User Fee Refund Program
65728 Industrial Distribution Group 751.23 Mechanical&Paint Supplies and Lock
65729 Industrial Threaded Products,Ina _ 212.25 Mechanical Parts&Supplies
65730 Interstate Batteries of Cal Coast 860.06 Batteries for Vehicles&Carta
65731 Intratek Computer, Ina 2,340.00 Network&Server Maintenance
65732 Invensys Systems, Ina 1,386.43 Instrument Supplies
65733 Iron Mountain Off-Site Data Protection 272.50 Offsite Back-Up Tape Storage for NT Server
H:ldeofnllMCRANEiFAHMFAHR2004wOVEMBER1Cletme geld Report-101604.ide EXHIBIT A
enplane Page 4 of 11 1110n004
e,
1
L i e
Claims Paid From 10/01104 to 10116104
Warrant No. Vendor Amount Description
65734 Irvine Sensors Corp. 7,304.40 Reconciliation User Fee Refund Program
65735 IPC Cal Flex,Inc 109.13 Reconciliation User Fee Refund Program
65736 J&B Auto Parts 29.95 Auto Parts&Supplies
65737 James"Tex"Climie 2,868.00 Professional Services-Nerisas Construction Progress&See Trials
65738 Jamison Engineering Contractors,Inc. 3,500.00 Installation of Flow Meter at Ycrbs Linda Pump Ste.
65739 Jays Catering 2,038.13 Meeting Expenses
66740 Jellco Container,Inc 1,772.58 Reconciliation User Fee Refund Program
65741 Jobs Available,Inc 138.00 Notioes&Ads
65742 Johnson Controls Inc 16.871.93 Reconclisticn User Fee Refund Program
65743 Johnstone Supply 17.61 Pump Parts&Supplies
65744 Karcher Insulation, Inc 4,352.52 Repairs&Maint Service-Repair Bailer Insulation on No.2 Boller
65745 Kenlen Specialities, Inc. 398.00 Reconciliation User Fee Refund Program
65746 Kirkhill Rubber 6,281.22 Reconciliation User Fee Refund Program
65747 Lam Lighting,Inc, 796.69 Reconciliation User Fee Refund Program
65746 Larry Welker Associates 9,316.25 Professional Services-NPOES Permit Reissue&Water Quality Regulatory Assistance
65749 Leech Corp. 360.80 Reconciliation User Fee Refund Program
65750 Liebert Cassidy Whitmore 232.00 Professional Services-Human Resource Policies&Procedures
65751 Lack N Stitch 5,538.45 Compressor Repair&Maint Services
65752 Lord&Sons, Inc 333.38 Mechanical Parts&Supplies
65753 Lucci's Gourmet Foods,Inc. 45.45 Meeting Expense
65764 LINJER 4,987.94 Professional Service-DART MO 9-22-99
65755 Magnetic Metals Corporation 2,457.04 Reconciliation User Fee Refund Program
65755 The Mathworks,Inc. 77.91 Software Maintenance-Matlab
65757 Mc Junkin Corp. 184.79 Valves
65758 Mead Westvaco Packaging 4,471.45 Reconciliation User Fee Refund Program
65759 Medlin Controls Co. 851.51 Instrument Supplies
65760 Midway Mfg&Machining Co. 12,926.95 Mechanical Parts&Supplies
65761 Milltronics clo RMB Engineering 490.26 Electrical Parts&Supplies
66762 Mission Uniform Service 3,005.86 Uniform Rentals
65753 Motion Industries, Inc.CA 55 1,629.04 Motor
65764 MARMAC Field Services,Inc, 2,316.95 Professional Services P1-92
65765 National Filter Media Corporation 43200.00 Filter Press Belts
65766 Neal Supply Co. 2.62 Plumbing Supplies
65767 The Norco Companies 179.68 Mail Delivery Service
65768 Nu-Teo Powder Coating 82.72 Reconciliation User Fee Refund Program
65769 NRG Thermal Services,L.L.C. 24,787.00 Construction J-79
65770 Office Depot Business Services Div. 6,337.24 Office Supplies
65771 Oracle Corporation 2,662.79 Software Maintenance&Support
65772 The Orange County Register 9,813.29 Reccnciliation User Fee Refund Program
65773 Orange Courier 927.08 Courier Services
66774 Orange Fluid System Technologies, Inc. 1,944.28 Plumbing Parts&Supplies
65775 Osterbsuer Compressor 62.58 Compressor Parts
65776 Oxygen Service Company 2,018.33 Specialty Gases
65777 OCB Reprographics 11,009.03 Printing Service-MO 1126/00
65778 P.L. Hawn Company,Inc 60.77 Electrical Supplies
65779 Pacific Mechanical Supply 72.06 Plumbing Supplies
65760 Pacific Parts&Controls 928.81 Sealer
H:ldeptfn121MCRANE1FAHR1FAHR20441NOVEM13EROolme NId Repart-101604.Yls EXHIBIT A
8n/210Ac Page 5 of 11 111&2004
Claims Paid From 10/01/04 to 10/15104
Warrant No. Vendor Amount Description
65781 Pacific Utility Products 169.10 Reconciliation User Fee Refund Program
65782 Pacifica Aerospace Corp. 2,639.30 Reconciliation User Fee Refund Program
65783 Parker Supply Company 2,939.02 Mechanical Parts&Supplies
65784 Parsons Water&Infrastructure,Inc. 659.16 Professional Services J42
65785 PenValve 19.26 Plumbing Parts&Supplies
65786 Performance Machine,Inn 2,578.31 Reconciliation User Fee Refund Program
65787 Pico Farad,Inc 887.39 Reconciliation User Fee Refund Program
65788 Pllkington Aerospace 8,029.81 Reconciliation User Fee Refund Program
65789 Pixelpushers,Inc 5,020.00 Professional Services-Web-Based,On-Line Job Application 8 Tracking System
65790 Pleion Corp.#2 1,860.40 Reconciliation User Fee Refund Program
65791 Port Supply 1,413.10 Instrument&Electronic Part Supplies
65792 Poster Compliance Center 346.01 State Compliance Posters
65793 Praxeir Distribution,Inc. 30.78 Demurrage
65794 Precious Metals Plating Co. 235.80 Reconciliation User Fee Refund Program
65795 Precision Painting 2,170.00 Reconciliation User Fee Refund Program
65786 Precision Powdercosting, Ina 78.43 Reconciliation User Fee Refund Program
65797 Precon,Ina 374.49 Reconciliation User Fee Refund Program
65798 Private Label Laboratories 1,050.34 Reconciliation User Fee Refund Program
65799 Progressive Marketing 2,563.96 Reconciliation User Fee Refund Program
85800 Propipe 24,852.65 CCTV Sewerline Inspection-Tustin
65801 Prudential Overall Supply 1,280.19 Uniforms
65802 Pump Engineering 1,551.60 Pump Supplies
66803 PS Tek, L.L.C. 441.70 Mechanical Parts&Supplies
65804 Quality Aluminum Forge 59&34 Reconcilietion User Fee Refund Program
65805 Quality Aluminum Forge,Ina 447.22 Reconciliation User Fee Refund Program
65806 Rallmakers, Ina 134.49 Reconciliation User Fee Refund Program
65807 Raney Industries 4,360.00 Contract Service-Belt Press Equipment Modification
65808 Reid Metal Finishing 573.19 Reconciliation User Fee Refund Program
66809 Restek Corp 115.42 Lab Parts&Supplies
65810 Ricoh Electronics#2 7,409.98 Reconciliation User Fee Refund Program
65811 Rigiflex Technology, Ina 73.75 Reconciliation User Fee Refund Program
65812 Rack Industries 6.69 Reconciliation User Fee Refund Program
65813 RBC Transport Dynamics 1,464.54 Reconciliation User Fee Refund Program
65814 Santana Services 158.02 Reconciliation User Fee Refund Program
66815 Schwing America,Inc, 7.02 Pump Supplies
65816 Secretary of Stale 20.00 Filing Fee-OCSO Financing Corp. Statement of Infarmaticn/Domestic Ncn-Profit Corp.
65817 Select Circuits 242.68 Recancillatian User Fee Refund Program
65818 Semicoa 469.02 Reconciliation User Fee Refund Program
65819 Shamrock Supply Co.,Inc. 2,260.79 Concrete
65820 Shepard Brothers,Inc. 3,754.65 Reconciliation User Fee Refund Program
65821 Sigma-Aldrich,Inc. 598.81 Lab Parts&Supplies
65822 James W. Silva 521.46 Meeting/Training Expense Reimbursement
65823 SkillPath Seminars 199.00 Training Registration
65824 Snell Infrared 1,450.00 Training Registration
66825 South Bay Chrome Sales 309.69 Reconciliation User Fee Refund Program
65826 Spox Certiprep,Inc. 807.96 Lab Parts&Supplies
65827 Star Powder Coating 15.43 Reconciliation User Fee Refund Program
H:Idept flnl2101CRANE�FAHRIFAHR2004SNOVEMBEMOlaima Paid Report•101 @04Ae EXH I BIT A
On121 QAc Page 6 of 11 11181204
Claims Paid From 10/01104 to 10/16104
Warrant No. Vendor Amount Description
65828 Summit Steel 1,137.48 Metal
65829 Sunset Industrial Parts 1,930.65 Mechanical Supplies
65630 SBC 61.41 Telephone Services
65831 SOT North America,Ltd. 186.35 Acoustic Grease Gun Adapter
65832 SPX Valves&Control 478.48 Valves
65833 Taormina Industries,Inc. 4,772.29 Reconciliation User Fee Refund Program
65834 Taormina Industries,Inc.#4 114.85 Reconciliation User Fee Refund Program
65835 Taylor-Dunn Manufacturing 6,248.85 Reconciliation User Fee Refund Program
65836 Teletrac,Inc. 245.00 Monthly Air-Time Service Fee&Software/Hardware Maint for Vehicle Tracking Sys.
65837 Textron Aerospace 9,042.90 Reconciilation User Fee Refund Program
66838 The Walking Man,Ina 3,260.00 Public Notice Printing&Mailing Services 7-39,7A1 &7-38
66839 Thompson Industrial Supply, Inc 1,680.27 Mechanical Supplies
65840 Time Warner Communication 40.47 Cable Services
65841 Daily Pilot 100.00 Notices&Ads
65842 Tony's Lock&Safe Service&Sales 080.60 Locks&Keys
65843 Toyota Racing Development#2 2,227.26 Reconciliation User Fee Refund Program
65844 Traffic Control Service,Inc. 283.38 Traffic Safety Equipment Rental
65845 Transline Technology,Inc. 240.00 Reconciliation User Fee Refund Program
65848 Tropical Plaza Nursery,Inc 7,935.79 Contract Groundskeeping MO 5-11-94
65847 Truck&Auto Supply,Inc. 288.24 Automotive Supplies
85848 TMV Systems Engineering,Inc. 812.50 Software Services
65849 US Filter Corp. 14,621.97 Service Agreement-Lab Purification System
65850 U.S.Geological Survey 4,192.45 Professional Services-Huntington Beach Investigation
65851 U.W.M.C.Hospital Corp.-Anaheim 5,214.64 Reconciliation User Fee Refund Program
65852 U-Line 607.17 Hand Truck&Mist Supplies
65853 Ultra Scientific 542.96 Lab Parts&Supplies
65854 Underground Service Alert of So. Calif. 1,416.80 Membership
65856 The Uniscurce Corporsticn 187.39 Office Supplies
65856 United Circuit Technology 451.35 Reconciliation User Fee Refund Program
65857 Urban Alternatives 6,520.00 Prof. Serv. -Comm. Role. Consulting SuppartlCoscting Re Ellis Ave. Pump Ste.
66858 Varian, Ina 204.12 Lab Parts&Supplies
66869 Vasco Electro Fab, Ina#2 43.12 Reconciliation User Fee Refund Program
65860 Vendor,Inc 11,448.40 Reconciliation User Fee Refund Program
65861 Verizon California 1,354.49 Telephone Services
65882 Veme's Plumbing 2,896.00 Service Contract-Testing&Cart.Badkffow Devices at Plts. 1 &2&Pump Ste.
65863 Vista Paint Corporation 2,573.12 Reconciliation User Fee Refund Program
65864 VWR Scientific Products Corporation 6,049.12 Lab Parts&Supplies
65865 The Wackenhut Corporation 12,426.82 Security Guards
65866 Weather&Wind Instrument Co. 1,026.38 Wind Sock
65867 West American Rubber Company 10,258.60 Reconciliation User Fee Refund Program
65868 West-Lite Supply Company, Ina 1,108.23 Electrical Supplies
65869 Western State Controls 731.58 Electrical Parts&Supplies
65870 Weyerhouser Company 20,386.84 Reconciliation User Fee Refund Program
65871 WEF 1,188.00 Membership-Water Environment Federation
65872 Xerox Corporation 119.18 Fax&Copier Leases&Maintenance
65873 XZX Electronics,Inc. 220.00 Reconciliation User Fee Refund Program
65874 York International 331.11 Electrical Supplies
hAdept fln121 MORANE1FAHRFAKR2(IGCNOVEM13MOelms Peld Repert-101504.bs EXHIBIT A
ftr210Ac Page 7 of 11 1118/2004
Claims Paid From 10101/04to 10/16104
Warrant No. Vendor Amount Description
65875 YCA 1,200.00 Training Registration
66876 Zee Medical 225.07 First Aid Supplies
65877 Layne T. Baroldi 261.70 Meetingfrraining Expense Reimbursement
65878 Carol T. Beekman 1,048.00 Meetingffralnfng Expense Reimbursement
65879 Thomas M. Blands 368.92 Meeting/Training Expense Reimbursement
65880 Rebecca A. Brooks 429.00 Meeting/Tralning Expense Reimbursement
65881 Marc A. Brown 2,034.94 Meeting/Training Expense Reimbursement
65882 Pongsakdi Cady 265.75 Meeting/Tralning Expense Reimbursement
65883 George A Charette 47201 Meeting/Training Expense Reimbursement
66884 James E. Colston 1,130.54 Meeting/Training Expense Reimbursement
65885 Steven R. DeWilde 684.84 Meeting/Training Expense Reimbursement
65866 Peter M. Hass 613.16 MeetingfTraining Expense Reimbursement
65887 Jin H Kim 150.00 Meetingffraining Expense Reimbursement
65888 Larry E. Lazorek 434.60 MeetinglTreining Expense Reimbursement
65889 William J. Lloyd 412.23 Meetingffraining Expense Reimbursement
65890 David A. Ludwin 1,848.64 MeetingfrraInIng Expense Reimbursement
65891 Laura Maravilla 19.03 Meeting/Tralning Expense Reimbursement
65892 Robert 0.Michaels 796.38 Meeting/Tralning Expense Reimbursement
65893 Fred J. O'Brien 805.34 Meeting/Training Expense Reimbursement
65894 Gary A. Pons 1,417.48 Meeting/Training Expense Reimbursement
65895 Bushra R Pope 17.00 Meetingfrralning Expense Reimbursement
65896 Jeremy J. Saum 160.88 Meeting/Training Expense Reimbursement
65897 Richard E. Schlegel,Jr. 1,295,00 Meeting/Training Expense Reimbursement
65898 John W. Swindler 468.55 Meeting/Tralning Expense Reimbursement
65899 Robert C.Thompson 880.33 Meetingffralning Expense Reimbursement
65900 William F. Webster,Jr. 827.06 Meeting/Tralning Expense Reimbursement
65901 Paula A. Zeiler 384.39 Meetingffraining Expense Reimbursement
65902 APT US&C 200.00 Professional Services -Investment Policy Certification Program
65903 City of Brea 92.60 Meeting Expenses-Community Outreach Meeting Re Carbon Canyon
65904 County of Orange-Auditor Controller 180.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
65905 Orange County Sanitation District 1,649.26 Petty Cash Reimb.
65906 Brian K Reed 195.03 Meeting/Training Expense Reimbursement
65907 West Coast Life 2,983.00 Employee Life Insurance Premium
66908 American Express 25,397.96 Purchasing Card Program, Misc Supplies&Services
65909 Nor-Cel Beverage Company, Inc. 144,764.63 Reconciliation User Fee Refund Program
65910 Occidental Energy Marketing, Inc 174,073.68 Natural Gas-Can Gen
65911 Stremdcks Heritage Foods 97,011.75 Reconciliation User Fee Refund Program
65912 A&G Electropollsh 1,588.25 Reconciliation User Fee Refund Program
65913 Accurate Circuit Engineering 349.26 Reconciliation User Fee Refund Program
65914 Accurate Metal Fabricators, Inc 467.12 Reconciliation User Fee Refund Program
65915 Airges Safety 5,631.83 Safety Supplies
65916 Alta-Robbins,Inc 399.17 Instrument Supplies
65917 Aluminum Precision 513.80 Reconciliation User Fee Refund Program
65918 Artisan Nameplate and Awards Corp. 1,408.64 Reconciliation User Fee Refund Program
65919 AMSA 900.00 Training Registration
65920 American Telephone&Telegraph Corp. 28.08 Telephone Service
65921 Basin Marine, Inc. 7.76 Reconciliaticn User Fee Refund Program
H:�dept fln12101CRAN MFAH RTAHR2004%NOVEM BERSClalms Paid Report-101604.x1e EXHIBIT A
An/2112Ac Page 8 of 11 11/1/2404
p a,
C o
Claims Paid From 10/01104to 10/16/04
Warrant No. Vendor Amount Description
66922 The Boeing Company 22,347.03 Reconciliation User Fee Refund Program
65923 Brand Scaffold Rental&Erection,Inc 2,060.00 Scaffolding Access at Scrubbers 9&10
65924 California Custom Shapes,Inc 885.25 Reconciliation User Fee Refund Program
65925 Cameron Welding Supply 177.83 Welding Supplies
85926 CircuitAcoess,Inc 317.64 Reconciliation User Fee Refund Program
65927 Classic Plating,Inc 588.06 Reconciliation User Fee Refund Program
65928 Clough's Rhubarb 12,573.21 Reconciliation User Fee Refund Program
65929 Court Order 150.00 Wage Garnishment
65930 Columbia West Anaheim Medical Center 1,783.83 Reconciliation User Fee Refund Program
65931 Compressor Components Of California 3,792.80 Repair&Maintenance Service-Rebuild 32 Fuel Check Valves at Pit.2 Warehouse
65932 Consumers Pipe&Supply Co. 167.25 Plumbing Supplies
65933 Cooper Cameron Corporation 662.37 Freight
65934 County of Orange 182.14 Wage Garnishment
65935 Court Trustee 69.12 Wage Garnishment
65936 Crest Coatings#2 161.47 Reconciliation User Fee Refund Program
65937 CCDA Waters,L.L.C. 7,602.39 Reconciliation User Fee Refund Program
65938 Dell Computer 21,034.03 (5)Computers,(1)Server&Hardware
65939 Department of Child Support Services 188.50 Wage Garnishment
65940 Dhorms Consulting 15,000.00 Professional Services-Strategic Planning&EMT Development
66941 Diehl,Evans&Co.,L.L.P. 700.00 Training Registration
65942 Embee Inc#1 10.27 Reconciliation User Fee Refund Program
66943 Embee Inc#3 69.84 Reconciliation User Fee Refund Program
65944 Employee Benefits Spedalists,Inc 9,792,38 Reimbursed Prepaid Employee Medical&Dependent Care
65945 Court Order 445.00 Wage Garnishment
65946 Fisher Scientific Company,L.L.C. 2,017.74 Lab Parts&Supplies
65947 Franchise Tax Board 100.00 Wage Garnishment
65948 Fry's Electronics 366.64 Computer Supplies
65949 Garg-Oil Production,L.L.C. 475.46 ReoondlisUcn User Fee Refund Program
65950 Garratt-Callahan Company 1,926.57 Chemicals
$5951 Gemini Industries 7,597.48 Reconciliation User Fee Refund Program
66952 General Ceramics,L.L.C. 1,819.01 Reconciliation User Fee Refund Program
65953 Global Environmental Network,Inc 608.00 On-Site Training-Traffic Control Safety Awareness
65954 Goglanisn Bakeries 5,100.03 Reconciliation User Fee Refund Program
65955 Gunther Athletic Service 89.48 Reconciliation User Fee Refund Program
65956 Harrington Ind. Plastics 183.35 Mechanical Parts&Supplies
65957 Harry's Dye&Wash, Inc 6,174.78 Reconciliation User Fee Refund Program
65958 Harte-Hanks Shoppers 1.111.75 Reconciliation User Fee Refund Program
65959 Herman Miller Workplace Resource 3,962.07 Office Furniture
65260 Ideal Uniform Rental Service 2,029.21 Reconciliation User Fee Refund Program
65961 Internal Revenue Service 300.00 Wage Garnishment
65962 internal Revenue Service 200.00 Wage Garnishment
65963 Intemational Food Solutions,Inc 5,465.02 Reconciliation User Fee Refund Program
65964 Intl. Union of Oper. Eng.AFL-CIO Local 501 3,929.98 Dues Deduction
65965 ICN Pharmaceuticals 779.76 Reconciliation User Fee Refund Program
65966 J.R 0.Operations TrusUH.B. Oil 207.67 Reconciliation User Fee Refund Program
65967 Johnstone Supply 39.70 Pump Supplies
65968 Kus Textiles,Inc. 492.63 Recondllabon User Fee Refund Program
H:Idoptfn121MCRANE1FAHMFAHR101141NOVEMBER Oaims Paid Report-101604.xfo EXHIBIT A
90210nc Page 9 of 11 1102004
Claims Paid From 10101104 to 10/16/04
Warrant No. Vendor Amount Description
65969 Le Palma Intercommunity Hospital 8,019.62 Reconciliation User Fee Refund Program
65970 Llnco Industries, Ina 353.43 Reconciliation User Fee Refund Program
65971 Lerman Education Services 319.00 Training Registratian
65972 Mac&Associates,An Industrial Disk Ca 426.45 Pump Supplies
65973 McMaster-Carr Supply Co. 1,320.43 Mechanical Parts&Supplies
65974 Mlcrometals, Inc.#2 771.57 Reconciliation User Fee Refund Program
65975 Milltranics clo RMB Engineering 5C6.33 Mechanical Parts&Supplies
65976 Court Order 225.00 Wage Garnishment
65977 National Bond&Trust 2,485.36 U.S. Savings Bonds Psyrcll Deductions
65978 National Plant Services,Inc. 4,350.00 Vacuum Truck Services
65979 New Hermes,Inc. 17.63 Freight
65980 Nuevo Energy 1,972.35 Reconciliation User Fee Refund Program
66981 Orange Fluid System Technologies, Inc. 119.15 Plumbing Parts&Supplies
65982 OCEA 698.61 Dues Deduction
65983 Partners Consulting Services 22,020.00 FIS On-Site Support-One World XE Migration Project
65984 Court Order 296.00 Wage Garnishment
65985 Paulus Engineering,Inc. 19,570.00 Constructicn-Sewerline Road Repairs in Tustin
65986 Payton Technology Corp 7,109.83 Reconciliation User Fee Refund Program
65987 Peace Officers Council of CA 1,593.00 Dues Deduction
65986 Plctometry International Corp. 20,000.00 Software License&Training-Image Library
66989 Precon Products 58&17 Manholes
65990 Pumping Solutions,Ina 826.55 Pump
65991 Red Wing Shoes 174.12 Safety Shoes
65992 Court Order 721.50 Wage Garnishment
65993 So. Col. Gas Company 1,193.54 Natural Gas
65994 Southern California Materiel Handling 22,616.73 (1)Caterpillar Forklift
65995 Speedy Circuits,Facility#2 1,772.83 Reconciliation User Fee Refund Program
65996 State Board of Equalization 350.00 Annexation Fee
65997 Summit Steel 3,038.05 Metal
66998 SETAC 325.00 Lab Administration/Quality Assurance Division Meeting Registration
65999 Thomas V. Gedinger 500.00 Lab Analyses
68000 Toyota Racing Development 302.85 Recandliaticn User Fee Refund Program
66001 Troy Systems,Inc, 865.91 Toner
66002 Truck&Auto Supply, Inc. 592.33 Automotive Supplies
66003 U S Bank 3,957.00 Administrative Fees Re Series 20110 Certificates of Participation
66004 Ultra Pure Metal Finishing, Ina 246.84 Reconciliation User Fee Refund Program
66005 United Way 245.00 Employee Contributions
66006 Universal Alloy Corp. 496.53 Reconciliation User Fee Refund Program
66007 UOP,L.L.C. 208.42 Reconciliation User Fee Refund Program
68008 UWMC Hospital Corp. 21,927.73 Reconciliation User Fee Refund Program
66009 Veils Circuits,Inc. 1,898.92 Reconciliation User Fee Refund Program
66010 Verizon California 63.23 Telephone Services
66011 Verteq Process Systems 721.37 Reconciliation User Fee Refund Program
66012 VWR Scientific Products Corporation 218.18 Lab Parts&Supplies
66013 Wally Machinery and Tool Supply,Inc. 189.54 Mechanical Parts&Supplies
66014 Waxie Sanitary Supply 3,232.60 Mechanical Ports&Supplies
66015 Welding Training Solutions,Inc. 600.00 Training Registration
H:NdepnAn12t01CRANEiFAHR�FAHR2004INOVEMHEMOsIme Paid Report-101504.x1s EXHIBIT A
W21 Oft Page 10 of 11 1118l2004
v
c � o
Claims Paid From 10101/04 to 10116/04
Warrant No. Vendor Amount Description
66016 West-Llte Supply Company, Inc 7.98 Electrical Supplies
66017 Winonics 4,264.31 Reconciliation User Fee Refund Program
66018 Court Order 597.50 Wage Garnishment
66019 Todd A.May 131.89 Safety Supplies
66020 California Municipal Treasurers Assoc 50.00 Accounting Meeting Registration
66021 Local Agency Formation Commission 1,150.00 Annexation Fees
66022 Nicholas Natty 660.00 Attorney Services Re I.N.S Work Visa Petition Process
66023 Orange County Sanitadon District 14,944.44 Wcrkefa Ccmp. Reimb.
66024 State Board of Equalization 500.00 Annexation Fee
66026 State Board of Equalization 300.00 Annexation Fee
66028 Carol T. Beekman 718.34 Meeting/Training Expense Reimbursement
Total Accounts Payable-Warrants $ 5,451,903.16
Payroll Disbursements
35340-35601 Employee Paychecks $ 60,906.13 Corrections&Retirement&Retro Payments*
35602-35714 Employee Paychecks 156,805.06 Biweekly Payroll 10/13/04
35715-35716 Employee Paychecks 448.70 Reissued Check&Retro Payment
103512-104053 Direct Deposit Statements 1,015,836.45 Biweekly Payroll 10/13/04
Total Payroll Disbursements $ 1,233,998.34
'Chedm 35340-36343 were Issued to September but not reported.
Wire Transfer Payments
OCSD Payroll Taxes&Contributions $ 819,391.76 Biweekly Payroll 10/13/04
JP Morgan Chase Bank 45,781.91 September Interest Payment on Series 1993 Certfticates of Participation
JP Morgan Chase Bank 113,638.41 Societe Generale September Swap Payment on 1993 Series Certificates of Participation
Total Wire Transfer Payments $ 978,812.08
Total Claims Paid 10101104-10/16104 $ 7,664,711.58
H:ldept ffn1z10 GRANEtiFAHMFAHR2004WOVEMBER\Calms Paid Report-101504.xle EXHIBIT A
t1n1210Ac Page 11 of 11 1118*004
C �
Claims Paid From 10/18/04 to 10/31/04
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
66027 Air Products&Chemicals,Inc. $ 27,267.39 0&M Agreement Oxy Gen Sys MO 8-8-89
66028 Basic Chemical Solutions,L.L.C. 49,632.64 Sodium Biaulfite&Sodium Hydro)dde
66029 Black&Veatch Corporation 91,749.59 Engineering Services J-77&5-58
66MO Blue Cross of California 338,945.11 Medical Insurance Premium
66031 Boyle Engineering Corporation 44,120.41 Professional Services 1-2-4
66032 Brown&Caldwell 243,711.12 Professional Services 132-90
66033 CH2MHill 40,232.00 Engineering Services-Urban Runoff Study
66034 Delta Dental 55,298.71 Dental Insurance Plan
66035 Environments)Science Associate 32,664.55 Professional Services J-40-5&J-40-10
66036 Flo-Systems,Inc. 38,000.20 Submersible Dry Pit Pump with Submersible Motor
66037 Fortis Benefits Insurance Company 29,245.18 Long-Term&Short-Term Disability Ins.Premium
66038 GHD,L.L.C. 56,060.50 Professional Services-Implementation of Asset Management Strategic Plan
66039 Houston&Harris PCS,Inc. 39,783.03 Sewerline Cleaning-City of Tustin&Unincorporated County Property
66040 HDR Engineering,Inc. 27,262.23 Professional Services J-40-10,P2-82&SP-74
66041 Kaiser Foundation Health Plan 60.522.08 Medical Insurance Premium
66042 Kemiron Companies,Inc. 99,161.02 Ferric Chloride MO 9-27-95
66043 Malcolm Pimie,Inc. 45.855.20 Professional Services J-79
66W MDS Consulting 34,125.00 Professional Services 1-2-4
66045 MWH Americas,Inc. 133,856.51 Professional Services 132-74
66(A6 Pioneer Americas,Inc. 236,349.52 Sodium Hypochlodte
66047 Polydyne,Inc. 66,128.85 CiaticnIc Polymer MO 3-11-92
66048 Psomes 64,216.00 Professional Services SP-15-Geographic Information System
66049 Sanccn Engineering,Inc. 47,300.00 Construction-Manhole Rehabilitation Program
66050 Tran Consulting Engineers 54,239.10 Engineering Services 7-21
66051 Tule Ranch/Magan Farms 243,609.20 Residuals Removal MO 3-29-85
66052 Teksystems 35,693.00 Temporary Employment Services
66053 U.S. Pero)dde,L.L.C. 116,061.53 Odor&Corrosion Control Treatment for Coll.Sys.;Hydrogen Peroxide&Ferrous Chloride
66054 ARB,Inc. 1,178,956.25 Construction 7-39&7-41
66055 J F Shea Construction,Inc. 1,936,333.47 Construction 132-85,J-77,J-35-1,J-35-2
66056 J R Filanc Construction 1,562,080.50 Construction P1-76
66057 Margate Construction,Inc. 382,434.93 Construction P1-37&J-67
66058 Clason Construction,Inc. 160,569.00 Construction P2-82
66059 Southern Contracting Company 72,346.00 Construction J-33-IA
66060 Torrey Pines Bank 173,564.50 Construction 131-76,Retention
66061 Union Bank of California 130,995.14 Construction 7-41,Retention
66062 Abrasive Engineering Tool&Equipment 25.86 Hardware
66063 Absolute Standards,Inc. 205.00 Lab Parts&Supplies
66064 Accounting Options,Inc. 103350.56 Temporary Employment Services
66065 AccuStandard,Inc. 567.75 Lab Supplies
66066 Acoustical Material Services 1,479.61 Ceiling Tile
66067 Advance Business Graphics 1,628.53 Forms
66068 Agilent Technologies,Inc. 872.78 Lab Parts&Supplies
66069 Airco Filter Service 2,057.42 Filters
H:ldeptffn1210\CRANEIFAHR\FAHR2004WOVEMBEMCIatms Pa!d Repert-103104.YIs EXHIBIT B
fln/210Ac Page 1 of 9 1118f2004
Claims Paid From 10/16104 to 10131104
Warrant No. Vendor Amount Description
66070 Airgas Safety,Inc. 1,571.07 Safety Supplies
66071 Airway Packing&Shipping,Inc. 237.05 Freight Charges
66072 Aico Products,Inc. 292.93 Janitorial Supplies
66073 Alhambra Foundry Co.,Ltd. 3.986.75 Manhole Frames&Covers
68074 American Red Cross 235.00 CPR Training&Miscellaneous Supplies
66075 American Training Resources,Inc. 537.31 Video-Forklift Safety
66076 Analysts,Inc. 589.58 Testing Kits
66077 Aquarium Doctor 105.44 Human Resources Aquarium Service
66078 Aquatic Testing Laboratories 1,000.00 Toxicity Testing
66079 Arch Wireless 1,592.60 Paging Service-Airtime,Service&Equipment
66080 Asset Management Solutions,L.L.C. 5,301.39 Professional Services-PeopleSoft Pilot Program for Fleet Services Stall
66081 AKM Consulting Engineers 7,963.20 Professional Services 7-36&7-41 -Trunk Sewer Improvements
66082 American Telephone&Telegraph Corp. 24.47 Telephone Service
66083 Baker Tanks 560.00 Tank Rentals
66084 Battery Specialties 979.64 Batteries
66085 Bell Pipe&Supply Co. 871.70 Mechanical Parts&Supplies
66086 BioMerleux Vitek,Inc. 558.65 Lab Supplies
66087 Bondlcgistix,L.L.C. 6,209.56 Prof.Serv.-Preparation of Interim Arbitrage Rebate Report-Series 2000"B"Series CON
66088 Brinderson 13,938.00 Professional Services 132-79
66089 C.S.U.F. Foundation 11,079.50 Membership-Center for Demographic Research
66090 California Auto Collision 2,447.99 Vehicle Repairs-V-478,V-525&V-486
66091 California Hazardous Services,Inc 4,200.00 Underground Storage Tank Cleaning
86092 Southern California Marine Institute 11,390.00 Ocean Monitoring Vessel Support
66093 Calply 755.00 Ceiling Tile
66094 Caltrcl,Inc. 6,894.59 Valves
66095 Cameron Welding Supply 163.51 Welding Supplies
66096 Cardlock Fuel Systems,Inc. 15,574.14 Fueling District Vehicles at Local Gas Stations
66097 Carleton Engineers&Consultants,Inc. 3,880.00 Engineering Services-Air Quality
66098 Carcilo Engineers 20,160.93 Professional Services 132-60&Coordinated Commercial Enterprise Project
66099 City of Fullerton 4,050.00 Manhole Grade Adjustments-City of Fullerton
66100 Cole-Parmer Instrument Co. 238.05 Lab Parts&Supplies
66101 Columbia Analytical Services,Inc. 600.00 Analysis of Wastewater,Industrial Wastewater&Biosolids
66102 Compressor Components of California 3,058.00 Compressor Repair&MainL Services
66103 Computer Sciences Corp. 12,933.12 Consulting&Lab Services-Assay Pilot Project
66104 Consolidated Elect. Distributors,Inc. 4,065.26 Electrical Supplies
66105 Consumers Pipe&Supply Co. 761.39 Plumbing Supplies
66106 Continental Exhibitions,Inc 725.00 Safety&Health Division Meeting Registration
66107 Cooper Cameron Corporation 1,093.13 Valves
66108 Corporate Business Interiors 3,976.01 Modifications to Cubicles at Human Resources Bldg.
66109 Corporate Express 2,102,42 Office Supplies
66110 Corporate Image Maintenance,Inc 160.00 Custodial Services Spec. No.9899-09
66111 Ccrtech Engineering 4,397.14 Pump Parts&Supplies
66112 Counterpart Enterprises,Inc. 1,782.20 Mechanical Parts&Supplies
66113 County Wholesale Electric Co. 351.60 Electrical Parts&Supplies
H:Wepri6n\2104RANEIFAHRIFAHR2004WOVEMSEMOulms Pstd Report-108104.xls EXHIBIT B
ennl one Page 2 of 9 11�912ao4
b
� A
Claims Paid From 10/16104 to 10131/04
Warrant No. Vendor Amount Description
66114 Cytec Industries,Inc. 7,495.93 Anionic Polymer
66115 California Special Districts Association 170.00 Training Registration
66116 CWEA Membership 388.00 Membership-Calif.Water Environment Assoc.
66117 CXtec 6,384.60 Computer Hardware
66118 David's Tree Service 1,075.00 Tree Maint.Service
66119 Del Mar Analytical 5,516.00 Analysis of Blosoiids and Wastewater
66120 Deli Computer 19.374.51 (2)Server Arrays&(8)Server Hard Drives
66121 Dunn-Edwards Corporation 13217.33 Paint Supplies
66122 DGA Consultants,Inc. 4,106.00 Professional Services-CCTV Data Evaluation&Support
66123 Ecology Control Industries 8,619.67 Hazardous Waste Disposal
66124 Elsevier Science 1,321.00 Publication
66126 Enchanter,Inc. 4,500.00 Ocean Monitoring&Outfall Inspection&Maintenance
66126 Environmental Microbiology Consulting 2,720.00 Lab Services-Research Primary Settlings In Pit.2 Basins
66127 Environmental Resource Association 1,461.60 Lab Parts&Supplies
66128 Equepac 2,024.80 Hydrochloric Acid
66129 ESRI,Inc. 2,331.00 Programming&Database Systems Division Meeting Registration
66130 FedEx Corporation 985.04 Freight Services
66131 First American Real Estate Solutions 658.00 On-Line Orange County Property Information
66132 Fisher Scientific 20,772.93 Lab Supplies
66133 Fluor Enterprises,Inc, 5,177.56 Engineering Services SP-81
66134 Fountain Valley Rancho Hand Wash 722.90 Truck Wash Tickets or Gasoline
66135 Franklin Covey 645.83 Office Supplies
66136 From Profiles 660.60 Human Resources Background Checks
66137 Frontline Management,Inc. 1,193.61 Controller
66138 Fry'a Electronics 224.05 Computer Supplies
66139 Full Spectrum Anaiytics 696.98 Instrument Repair&Maintenance Service
66140 Full Spectrum Anslytics,Inc. 782.10 Instrument Repair&Maintenance Service
66141 FT,Inc. 825.00 Forms-Accounts Payable Check Stock
66142 G. E.Supply 773.30 Electrical Parts&Supplies
66143 Genahl Lumber Company 96.98 Lumber/Hardware
66144 George T. Hall 53.88 Electrical Supplies
66145 George Yardley Co. 1,434.65 Lab Supplies
66146 Getinge Castle 908.50 Lab Equipment Maintenance&Service
66147 Gieriich-Mitchell,Inc 95.27 Mechanical Parts&Supplies
66148 Grainger,Inc. 1,161.60 Electrical Parts&Supplies
66149 Grating Pacific,Inc. 1,317.03 Welded Steel Grating
66150 Great Western Sanitary Supplies 100.03 Janitorial Supplies
66151 Guarantee Records Management 189.66 Off-Site Records Storage
66162 Hach c/o Pontan Industries 186.68 Lab Parts&Supplies
66153 Hach Company 427.02 Electrical Parts&Supplies
66154 Harold Primrose Ice 55.50 Ice For Samples
66155 Harrington Ind. Plastics 848.35 Mechanical Parts&Supplies
66156 Harrington Industrial Plastics,Inc 3,523.03 Mechanical Parts&Supplies
66157 Home Depot 935.84 Misc.Repair&Maintenance Material
H:\daryfl4n12105CRANEiFAHRIFAHR2004WOVEMBERICialms Peld Report-10 IGO[s EXHIBIT B
nn/Mft Page 3 of 9 111erim
Claims Paid From 10/16/04 to 10/31/04
Warrant No. Vendor Amount Description
66158 Hopkins Technical Products 3,027.12 Valves
66159 Hub Auto Supply 661.02 Vehicle Parts&Supplies
66160 City of Huntington Beach 552.34 Water Use
66161 Industrial Distribution Group 5,793.52 Mechanical Parts&Supplies,Paint,Locke&Tools
881$2 Industrial Threaded Products,Inc. 1,073.27 Mechanical Parts&Supplies
66163 Innertine Engineering 2,324.01 Sewerllne Video Inspection-7-39
66164 Iron Mountain 86.06 Bid Document Storage Fees P1-37
66165 Irvine Ranch Water District 3.90 Water Use
66166 Irvine Technology Corporation 20,784.00 Temporary Employment Services
66167 Isco,Inc. 5,129.73 Controller Assemblies
66168 ISI,Inc. 1.663.80 Software Maintenance&Support
66169 J&L Industrial Supply 451.11 Mechanical Parts&Supplies
66170 Jays Catering 751.41 Meeting Expenses
66171 Kforce,Inc. 806.99 Temporary Employment Services
66172 Klenow Associates,Inc. 7,235.48 Legal Services 1-2-4
66173 Lab Safety Supply,Inc. 340.52 Lab Parts&Supplies
66174 Lee&Ro,Inc. 18,809.82 Professional Services 5-51 &5-52
66175 Lucci's Gourmet Foods,Inc. 37.50 Meeting Expense
66176 Lustre-Cal 621.75 OCSD Decals
66177 LINJER 5,029.06 Professional Service-DART MO 9-22-99
66178 Mac&Associates,An Industrial Dist.Co. 654.58 Valves
66179 Managed Health Network 955.80 Employee Assistance Program
66180 Mason West,Inc. 995.61 Mechanical Parts&Supplies
66181 Mayer,Brawn,Rowe&Maw,L.L.P. 5,000.00 Professional Services-Strategic Planning&Advocacy
66182 McMaster-Carr Supply Co. 2,015.65 Mechanical Parts&Supplies
66183 McRay Industries,Inc. 11,438.63 Mechanical Parts&Supplies
66184 Medlin Controls Co. 473.52 Instrument Supplies
66185 Mid-West Associates 989.12 Pump Supplies
68186 Midway Mfg.&Machining Co. 14,368.10 Mechanical Parts&Supplies
66187 Mission Abrealve&Janitorial Supplies 207.96 Janitorial Supplies
66188 Mitchell Instrument Co. 1,136.00 Instrument Parts&Supplies
66189 Moreland&Associates 8.655.00 Auditing Services MO 3-8-95
66190 Motion Industries,Inc. CA 55 1,535.98 Mechanical Parts&Supplies
66191 National Fire Protection Asscciation 580.50 Subscription
66192 National Plant Services,Inc. 17,060.00 Vacuum Truck Services
66193 National Seminars Group 179.00 Training Registration
66194 Neal Supply Co. 29.70 Mechanical Parts&Supplies
66195 Nextel Communications 1,216.62 Cellular Phones&Air Time
66196 Ninyo&Moore Corporate Accounting 9,734.00 Professional Services-Materials Testing,Inspection&Geotechnical Engrg.
66197 Norlab 189.60 Chemicals
66198 Numatic Engineering 188.69 Mechanical Parts&Supplies
66199 Office Depot Business Services Div. 503.64 Office Supplies
66200 OneScurce Distributors,Inc. 2,230.12 Electrical Parts&Supplies
66201 Orange County Hose Company 82.92 Hydraulic Hose Supplies&Parts
H:\depn1fn12i MRANE\FAHRTAHR2004\NOVEMBEMClalrns Paid Report-103104.xls EXHIBIT B
final one Page 4 of 9 11varim
4 0
C ' A
Claims Paid From 10110104 to 10131104
Warrant No. Vendor Amount Description
66202 Orange Courier 88.70 Courier Services
66203 Orange Fluid System Technologies,Inc 343.05 Plumbing Parts&Supplies
66204 Osterbauer Compressor 2,535.52 Mechanical Supplies
66205 Oxygen Service Company 470.49 Specialty Gases
66208 OCB Reprographics 6,509.00 Printing Service-MO 1/26100
66207 Pacific Bell Internet Services 328.93 Internet Service
66208 Pacific Mechanical Supply 2,212.69 Plumbing Supplies
66209 Parker Supply Company 5,664.06 Mechanical Parts&Supplies
66210 PenValve 206.20 Plumbing Parts&Supplies
66211 Perma Pure,Inc. 178.08 Lab Parts&Supplies
66212 Power Measurement USA,Ina 73003.75 Software Upgrade&Support
66213 Primary Source Office Furnishings,Inc. 75.00 Office Furniture
66214 Proplpe 2,003.90 CCTV Sewerline Inspection-City of Tustin
66215 Prudential Overall Supply 13939.30 Uniforms&Misc.Supplies
66216 PCS Express,Ina 122.00 Courier Service
66217 Rseo Manufacturing&Engineering Co. 524.88 Computer Hardware/Softwore
66218 Rainbow Disposal Co. 2,816.57 Trash Removal
66219 Rellostar 9,889.50 Employee Basic Life&Managers'Insurance Premiums
66220 Ricoh Business System 1,623.90 Color Copier Lease
66221 RMS Engineering&Design,Inc. 1,370.00 Engineering Services-Covering 12V Switchgeor at Pit.2
66222 RPM Electric Motors 172.40 Motor
66223 Safetycore,Inc. 263.21 Safety video
66224 Santa Ana Reg.Water Duality Control 522.00 Permit Fees-Projects 6-51 6-52
66225 Schwing America,Inc. 1,388.70 Valves
66226 Scottel Voice&Data,Inc. 2,284.80 Telephone System Maintenance
66227 Seton Name Plate 415.78 Reflective Traffic Safety Sign
66226 Sewer Equipment Company of America 124.23 Hose Guides
66229 Shamrock Supply Co.,Inc. 898.23 Janitorial Supplies
66230 Shureluck Sales&Engineering 1,117.78 Mechanical&Paint Supplies
66231 Sigma-Aldrich,Inc. 866.32 Lab Parts&Supplies
66232 Smardon Supply Company-Fountain Valley 123.95 Mechanical Parts&Supplies
66233 Smith Pipe&Supply 450.17 Plumbing Supplies
66234 Smith-Emery Company 12.611.25 Soils,Concrete&Other Materials Testing
66235 So. Col.Gas Company 22.726.70 Natural Gas
66236 Southern Califomia Edison 18,002.25 Power
66237 Southern Califomis Edison Co. 23,522.69 Construction-SCE/OCSD Projects 5-51 &5-52
66238 Southern Callfomia Edison 2,255.52 Power
66239 Southern Counties Lubricants 2,e66.49 Engine 011
66240 Southwest Scientific,Inc. 2,880.16 Instrument Parts&Supplies
66241 Summit Steel 2.175.58 Metal
66242 Sunset Ford 228.01 Auto Parts&Service
66243 Sunset Industrial Parts 147.29 Mechanical Supplies
66244 Technical Service Group,Ina 1,381.60 SCADA System VAX Service Agreement
66245 Systime Computer Corp. 4,350.00 Professional Services-EnterpriscOne FIS System Upgrade&Support
WderAftliMCRANEIFAHRIFAHR20041NOVEM13ER1Clalms Pold Report-i=04.x1s EXHIBIT B
%1210nc Page 5 of 9 1118n004
Claims Paid From 10/16/04to 10131/04
Warrant No. Vendor Amount Deacription
66246 SARBS 135.00 Environmental Compliance Services Division Meeting Registration
66247 The Walking Man,Inc. 1,060.00 Public Notice Printing&Mailing Services Various Projects
66248 Thompson Industrial Supply,Inc. 11,030.19 Mechanical Parts&Supplies-Rebuild Shop
66249 Tanya Lack&Safe Service&Sales 104.92 Locke&Keys
66250 Townsend Public Affairs 5.000.00 Legislative&Executive Advocate for Grant Funding
66251 Southern California Trane Service 116.18 Valves
66252 Truck&Auto Supply,Inc. 169.42 Automotive Supplies
66253 The Unisource Corporation 134.43 Office Supplies
66254 United Parcel Service 93.60 Parcel Services
66255 UC Regents 1,250.00 Membership
66256 US Equipment Co.,Inc. 223.24 Mechanical Parts&Supplies
66257 The Vantage Group,L.L.C. 23,850.00 Temporary Employment Service
66258 Vapex,Inc. 472.00 Pumps
66259 Varian,Inc. 2,158.62 MS Workstation Upgrade
66260 Verizon California 2,080.94 Telephone Services
66261 Veme's Plumbing 330.00 Service Contract-Testing&Cert. Back low Devices at Pits. 1 &2&Pump Ste.
66262 Vision Service Plan-(CA) 9,540.96 Vision Service Premium
66263 Vortex Corp. 989.95 Door Repair&Maintenance Service
66264 VWR Scientific Products Corporation 8,367.27 Lab Parts&Supplies
66265 The Wackenhut Corporation 6,008.30 Security Guards
66266 Water 3 Engineering,Inc. 5,991.64 Engineering Services J-67
66267 Waxie Sanitary Supply 878.24 Janitorial Supplies
66268 West Texas A&M University 5,700.00 Olfactometry Analyses
66269 West-Lite Supply Company,Inc. 202.52 Electrical Supplies
66270 Westport Aparatus DBA Breaker Supply 247.64 Electrical Parts&Supplies
66271 Xerox Corporation 1,142.73 Fax&Copier Leases
66272 Xpedex Paper&Graphics 221.34 Office Supplies
66273 Ararat Construction Co.,Inc. 19,408.37 Construction P1-62
66274 California Bank&Trust 8.038.00 Construction J-33-1A,Retention
66275 Orange Community Bank 17,841.00 Construction 132-82,Retention
66276 Matt Adams 259.47 Meeting/Tralning Expense Reimbursement
66277 Jose C.Ambriz 170.07 MeetingFfralning Expense Reimbursement
66278 Donald R.Cleveland 51.00 Meetingffralning Expense Reimbursement
66279 David P.Halverson 662.74 Meetfng£fraining Expense Reimbursement
66280 Michael H. Harting 666.44 Meeting/Tralning Expense Reimbursement
66281 Vincent S.Lockyer 170.00 Meeting/Training Expense Reimbursement
66282 Henry E.Lorimer 428.00 Meeting/Trainfng Expense Reimbursement
66283 Rfaz K. Moinuddin 932.85 Meeting/Tralning Expense Reimbursement
66284 Jamienn M. Quests 118.52 Meeting/Training Expense Reimbursement
66285 Donald W. Ragan 757.80 Meeting/Tralning Expense Reimbursement
66286 Ernest R. Sevedra 90.00 Meeting/Training Expense Reimbursement
66287 Duane T. Smith 259.47 Meetfng/fraining Expense Reimbursement
66288 Douglas M.Stewart 1,956.00 Meeting/Training Expense Reimbursement
66289 Robert J.Taylor 537.33 Meeting/Training Expense Reimbursement
ti:Wept\fln12101CRANMFAHR\FAHR2004W OVEMSEMaelms Paid Report-103104.xis EXHI BIT B
Ilnnlcaa Page 6 of 9 111WW
eo e,
Claims Paid From 10116104 to 10/31/04
Warrant No. Vendor Amount Description
66290 Robert J.Thiede 167.75 Meeting/Training Expense Reimbursement
66291 Shane A Towns 259.47 Meeting/Training Expense Reimbursement
66292 Walter W. Williams 170.07 Meeting/Training Expense Reimbursement
66293 Steve Anderson 706.00 Meeting/Training Expense Reimbursement
66294 Donald Hughes 641.92 Meeting/Training Expense Reimbursement
66295 Mari Isodo and Anton Richardson, 6,500.00 Claim Settlement-Vehicle Accident
66296 Wild Rivers Waterpark 1,263.50 Reimbursable Employee Activity Expense
66297 Yumi Iseda and Mari Isoda 3,500.00 Claim Settlement-Vehicle Accident
66298 California Recreation Company 300.00 Boat Slip Rental-Ocean Monitoring Vessel
66299 Southern California Edison 121,707.11 Power
66300 Woodruff,Spradlin&Smart 161,490.35 Legal Services MO 7-26-95
66301 Air Cleaning Solutions 992.00 Freight Charges
66302 Airgas Safety,Inc. 1,000.21 Safety Supplies
66303 Analytical Planning Services,Inc. 945.00 Professional Services J-67
66304 ASCE-HHTG-Hydrology&Hydraulics 46.00 Engineering&Construction Division Meeting Registration
66305 AT&T Universal Biller 2,920.10 Telephone Service
66306 American Telephone&Telegraph Corp. 195.40 Telephone Service
66307 Basler Electric Company,Department 590 2,881.23 Generator Protection System&24V Power Supply
66308 Beau Geste Enterprises 6,500.00 On-Site Training
66309 California Auto Collision 1,513.58 Repairs&Maintenance Service-V-486
66310 Caltrol,Inc. 10,259.89 Electrical Parts&Supplies
68311 Court Order 150.00 Wage Garnishment
68312 Consolidated Elect. Distributors,Inc. 1,643.29 Electrical Parts&Supplies
66313 Consumers Pipe&Supply Co. 14.39 Plumbing Supplies
66314 Corporate Express 2,571.44 Office Supplies
66315 County of Orange 182.14 Wage Garnishment
66316 Court Trustee 69.12 Wage Gamishment
66317 Department of Child Support Services 168.50 Wage Garnishment
66318 DHL Express(USA),Inc. 45.68 Freight Services
66319 Employee Benefits Specialists,Inc. 9,792.38 Reimbursed Prepaid Employee Medical&Dependent Care
66320 Court Order 445.00 Wage Garnishment
66321 Fed Ex Corporation 149.62 Freight Services
66322 Fisher Scientific 776.72 Lab Supplies
66323 Fleetcor 113.79 Gasoline&Lubricants
66324 Franchise Tax Board 100.00 Wage Garnishment
66325 Get Motivated Seminars,Inc. 98.90 Project Management Office Meeting Registration
66326 Graybor Electric Company 100.18 Cabinets for CRISP Hardware System-Bacteria Reduction Program
66327 Industrial Threaded Products,Inc. 82.72 Mechanical Parts&Supplies
66328 internal Revenue Service 300.00 Wage Garnishment
66329 internal Revenue Service 200.00 Wage Garnishment
66330 Intl.Union of Oper.Eng.AFL-CIO Local 501 3,887.42 Dues Deduction
66331 Irvine Rench Water District 37.19 Water Use
66332 Kelly Paper 352.99 Paper
e6333 L&N Image Apparel 371.26 (20)OCSD Shirts-Employee Incentive Program
H:Wept1En12101CRANEIFAHRTMR2004WOVEMHERICIalms Psld Report-1031G4.xls EXHIBIT B
nnnlOAc Page 7 of 9 111=04
Claima Paid From 10/16104 to 10/31104
Warrant No. Vendor Amount Description
66334 MessMutual Michel Financial Group 2,604.14 Executive Disability Plan Premium
66335 McMaster-Carr Supply Co. 746.97 Mechanical&Safety Supplies
66336 Mechanical Drives Co. 91.46 Instrument Supplies
66337 Midway Mfg&Machining Co. 8,835.50 Repair&Maintenance Service-(2)Belt Press Driver Rollers
66338 Mike Prlich&Sons 6.038.00 Engineering Services-Install 72"ID Manhole
66339 Court Order 225.00 Wage Garnishment
66340 Motion Industries,Inc. CA 55 30.01 Repair&Maintenance Material
68341 MSA-CIO Geoff Cobbett 85.00 Membership
66342 National Bond&Trust 2,462.28 U.S.Savings Bonds Payroll Deductions
66343 Neal Supply Co. 13.49 Freight Charges
66344 Orange Fluid System Technologies,Inc. 549.20 Mechanical Parts&Supplies
66345 Oxygen Service Company 266.59 Specialty Gases
66346 OCEA 607.86 Dues Deduction
66347 Pacific Mechanical Supply 313.00 Plumbing Supplies
66348 Partners Consulting Services 22,080.00 FIS On-Site Support-One World XE Migration Project
66349 Court Order 296.00 Wage Garnishment
66350 Peace Officers Council of CA 1,602.00 Dues Deduction
66351 Process Equipment Company 5,128.80 Replacement of Power Building Double Doors
66352 Pump Engineering 31.94 Freight Charges
68353 R.L.Abbott&Associates 3,000.00 Kern County Blosolids Consulting Services
66354 Reilly&Associates 5,915.10 Investigative Services
66355 Schwing America,Inc. 769.34 Repair&Maintenance Service on Schwing Truck Loading Pumps 1,2&3
66356 Soott Specialty Gases,Inc 25.86 Demurrage
66357 Seel's Compressed Gases 39.76 Oxygen Bottle Refills for Medical Team
66358 Shureluck Sates&Engineering 2,727.27 Mechanics]Parts&Supplies
e8359 Sks]ar,Inc. 1,295.00 Installation&Training on Skslar Analyzer
66360 Smith-Emery Company 260.00 Scils,Concrete&Other Materials Testing
66361 Court Order 721.50 Wage Garnishment
66362 Southern California Edison 29.99 Power
66363 Summit Steel 341.59 Metal
66364 Systime Computer Corp. 23,900.00 Professional Services-EnterpriscOne FIS System Upgrade&Support
66365 SBC 1,726.89 Telephone Services
66366 SBC Long Distance 73.81 Telephone Services
86367 Thompson Industrial Supply,Inc. 3.198.97 Mechanical Supplies
66368 The Unisource Corporation 223.44 Office Supplies
66369 United Parcel Servioe 6,811.52 Parcel Services
66370 United Way 245.00 Employee Contributions
66371 Univar USA 270.37 Chlorine
66372 Verizon 49.78 Telephone Servloe
66373 Verizon California 5,412.90 Telephone Services
66374 Xerox Corporation 2,631.90 Fax&Copier Leases
66375 Court Order 597.50 Wage Garnishment
66376 Aram C.Chanhbazien 188.77 User Fee Refund Regarding Septic Tanks
66377 Bernal Peralts Trust 1,003.95 User Fee Refund Regarding Septic Tanks
H:\dapt\ffn\2iO\CRANE\FAMR\FAHFt2CG4\NC3VEMSEMCIalms Pald Report-1031 G4.xis EXHIBIT B
11n12/0llc Page 8 of 9 11/6=04
m <
b
Claims Paid From 10116/04 to 10131104
Warrant No. Vendor Amount Description
66378 Betsy Causey Trust 1,003.95 User Fee Refund Regarding Septic Tanks
66379 California Recreation Company 2,914.22 Temporary Boat Slip Rental-Ocean Monitoring Vessel
66380 Cecilia Gutierrez-Swanson 1,003.95 User Fee Refund Regarding Septic Tanks
66381 County of Orange-Auditor Controller 825.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
66382 Darrin IGnney 1,003.06 User Fee Refund Regarding Septic Tanks
66383 Derrick Garda 1,003.95 User Fee Refund Regarding Septic Tanks
66384 Hartford Fire Insurance Company 1,008.14 Claim Settlement-Vehicle Accident
66385 Jerome Kult 1,418.21 User Fee Refund Regarding Septic Tanks
66386 Joel Verduzoo 1,003.95 User Fee Refund Regarding Septic Tanks
66387 Marcleno Santiago 1,681.27 User Fee Refund Regarding Septic Tanks
66388 Oscar Abreu 1,418.21 User Fee Refund Regarding Septic Tanks
66389 SARBS 135.00 Training Registration
66390 Wiliam Hopkins 1,003.95 User Fee Refund Regarding Septic Tanks
66391 SBC 6,169.00 Telephone Services
Total Accounts Payable-Warrants $ 9,154,490.61
Payroll Disbursements
35717-35724 Employee Paychecks $ 20,178.69 EMT Retro Payroll&Correction
35725-35817 Employee Paychecks 149,500.39 Biweekly Payroll 10/27/04
35818-35820 Employee Paychecks 4.379.34 Termination Paychecks&Reissue Check for Direct Deposit Void
104054- 104590 Direct Deposit Statements 1,086,018.06 Biweekly Payroll 10/27/04
Total Payroll Disbursements $ 1,260,076.38
Wire Transfer Payments
OCSD Payroll Taxes&Contributions $ 799,717.99 Biweekly Payroll 1 G127/04
U.S. Bank 354.208.61 October Interest Payment for Series 2000,A&B Certificates of Participation
Total Wire Transfer Payments $ 1,154,626.60
Total Claims Paid 1 0/1 6104-1 0/31/04 $ 11,569,193.59
H:WerMW2101CRANEIFAHRXFAHR2004WOVEMBEMCIaima Paid Repert-1031GOIs EXHIBIT B
W210nc Page 9 of 9 11W2004
BOARD OF DIRECTORS Meeting Date To Bd. of Dir.
11/17/04
AGENDA REPORT Item Number Item Number
9a
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Bob Chenowith, Senior Engineering Associate
SUBJECT: PROPOSED ANNEXATION NO. OCSD-45 — BOLLEN ANNEXATION
GENERAL MANAGER'S RECOMMENDATION
(1) Receive and file petition from Rene Bollen requesting annexation of 1.30 acres to
Orange County Sanitation District, in the vicinity of Randall Street and Meads Avenue,
in an unincorporated area of Orange County; and (2) Adopt Resolution No. OCSD
04-27, authorizing initiation of proceedings to annex said territory to OCSD (Proposed
Annexation No. OCSD-45 — Bollen Annexation).
SUMMARY
• OCSD received a request from Rene Bollen to annex one (1) parcel which totals
1.30 acres to OCSD. This parcel will be connected to an existing OCSD 12-inch
sewer on Randall Street.
• This parcel will be annexed to the City of Orange. There is an existing three (3)
bedroom home on the Bollen property. The property owner will build a new two (2)
bedroom guest house on the same property.
• Orange County Sanitation District will collect the sewer inspection and sewer
capacity fees for both homes as shown in the cost summary. The assessor parcel
number is 379-561-06.
PROJECT/CONTRACT COST SUMMARY
This annexation is in accordance with the terms of the negotiated agreement with the
County of Orange regarding A.B.8 Tax Exchange for annexing properties. The Board of
Directors approved this action and it became effective March 14, 1989. Under this Tax
Exchange, OCSD does not receive a percentage of the basic levy, and instead, collects
a higher annexation fee. The fee of $7,549.00 includes the following:
LAFCO Processing Fee $ 1 ,150.00
OCSD Processing Fee 500.00
State Board of Equalization Processing Fee 350.00
CA Environmental Quality Act Filing Fee 43.00
OCSD Annexation Acreage Fee $ 5,506.00
TOTAL ANNEXATION FEE $ 7,549.00
BOARD OF DIRECTORS Meeting Date To Bd.of Dir.
11/17/04
AGENDA REPORT Item Number Item 9 Number
_ b
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Adam Nazaroff, Associate Engineer III
SUBJECT: EFFLUENT PUMP STATION ANNEX, JOB NO. J-77
GENERAL MANAGER'S RECOMMENDATION
Ratify the purchase of an easement from the County of Orange Resources
Management Development Department for the Effluent Pump Station Annex, Job
No. J-77, in an amount not to exceed $7,500, in a form approved by General Counsel.
SUMMARY
• Effluent Pump Station Annex (EPSA), Job No. J-77, will replace the existing Foster
Booster Pump Station with a new pumping facility that is capable of providing
adequate back up capacity to the existing Ocean Outfall Booster Station (OOBS),
during excess flow events and routine maintenance.
• The needed easement is 864 square feet in area and is required for this project to
construct a junction box on the County of Orange Resources Management
Development Department property. The land is located adjacent to the fence line on
the east side of Treatment Plant No. 2.
PRIOR COMMITTEE/BOARD ACTIONS
Prior Committee and Board actions for Effluent Pump Station Annex (EPSA), Job
No. J-77, are not applicable to this item.
PROJECT/CONTRACT COST SUMMARY
Please see attached Budget Information Table. The total cost for this easement is
$7.500 for processing, appraisal, and land costs.
BUDGETIMPACT
X This item has been budgeted. (Line item: Section 8, Page 81 )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
FI:\dep1\agenda0oard Agenda Reports\2004 Board Agenda Roports\1104\Item 9(b).J•77 Easement.doc
Revised: 06/04/03 Page 1
ADDITIONAL INFORMATION
The subject project is in the construction phase at this time. A portion of Junction Box
"C" that will be built under the subject project will be on the County of Orange
Resources Management Development Department property.
Orange County Sanitation District legal counsel has reviewed the proposed Easement
Deed and found it to be acceptable with no comments.
ALTERNATIVES
None
CEQA FINDINGS
The rehabilitation of Foster Pump Station (FPS) was included in the 1999 Strategic Plan
Environmental Impact Report (EIR). The EIR was certified on October 27, 1999, and a
Notice of Determination was filed on October 29, 1999. A supplemental EIR (SEIR)
was completed for update of the Program EIR to reflect replacement of FPS rather than
the rehabilitation indicated in the Strategic Plan. The SEIR was approved by the Board
in December 2002.
ATTACHMENT
Budget Information Table
AN:sa
H:\ntglobal\Agenda Draft Reports\Joint Boards\J-77 agenda report accept land acq_v2.doc
H:ldepl\agenda\Board Agenda ReportsQ004 Board Agenda Reports\1104\Item g(b).J-77 Easement.doc
Revised: 06/04/03 Page 2
BUDGET INFORMATION TABLE
Efffuent Pump Station Annex
JOB NO. J-77
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS ESTIMATED ESTIMATED
PROJECT/PHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZ PROPOSED TOTAL ATION EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
/DECREASE
Phase 1 -Project
Development $ 21,000 $ 3,000 $ 3,000 $ 3,000 $ 3,000 $ 3,000 100%
Phase 2-Preliminary
Design $ 1,258,000 S 61,000 $ 61,000 $ 61,000 $ - $ 61.000 $ 61,000 100%
Phase 3-Design $ 3,501,000 $ 4,417,000 $ 4,417,000 $ 4,387,823 $ 4,387,823 $ 4,387,823 100%
Phase 4-Construction $ 43,745,000 $ 52,221 388 $ S 52.221,388 $ 48,282,296 $ - S 48.282,296 $ 11,200 000 23.2%
Phase 5-Commissioning $ 376,000 1 $ 374.000 $ 374,000 S 374,000 $ 374,000 $ - 0%
Phase 6-Close-Out $ 94.000 $ 95,000 $ 95,000 $ 95,000 $ 95,000 $ - 0%
Phase 7-Contingency S 1.762,000 $ 4.166.612 $ S 4,166,612 Is $
PROJECT TOTAL $ 50,757,000 $ 61,338,000 $ $ 61,338,000 1 $ 53.203.119 $ - $ 53,203,119 1 $ 15,651,823 29%
Reimbursable Costs I I I -] I T I I i
PROJECT NET $ 50,757,000 $ 61,338,000 $ - $ 61,338,000 1 $ 53,203,119 1 $ - 1 $ 53,203,119 $ 15,651,823 29%
PSA/Contract
Fes,s /Const. Su ort PSA $ 2.208,810 $ 6 164,240 $ - $ 6164.240 $ 6,164240 $ - $ 6164240 $ 4,800,000 78uction Contract $ 44,735,518 $ 43,286 748 $ - $ 43.286,748 $ 43,286,748 $ - $ 43,286,748 $ 9.000,000 21
EDMS 003781789
MINUTES OF STEERING COMMITTEE MEETING
Wednesday, October 27, 2004
A meeting of the Steering Committee of the Orange County Sanitation District was
held on Wednesday, October 27, 2004 at 5 p.m., in the District's Administrative
Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS: STAFF PRESENT:
Directors Present: Blake Anderson, General Manager
Steve Anderson, Chair Bob Ghirelli, Director of Technical Services
Jim Ferryman, Vice Chair David Ludwin, Director of Engineering
Carolyn Cavecche, Chair, OMTS Committee Carol Beekman, Director of Communications and
Roy Moore, Chairman, FAHR Committee Administrative Services
Shirley McCracken, Past Board Chair Jennifer Cabral, Public Information
Specialist
Directors Absent: Jim Colston, Legal & Regulatory Affairs
Brian Donahue, Chairman, PDC Committee Liaison
Jim Silva, County Supervisor Jim Herberg, Engineering Manager
Ed Torres, Engineering Manager
OTHERS PRESENT: Jim Burror, Senior Engineer
Director Cathy Green Mike Moore, Environmental compliance &
Director Tod Ridgeway Monitoring Manager
Thomas L. Woodruff, General Counsel Layne Baroldi Legal & Regulatory Affairs
Brad Hogin, Counsel Liaison
Don Hughes, Asst. to Supervisor Silva Ann Sullivan, Principal HR Analyst
Steve Bone, Robert Mayer Corp Gail Garrett, Committee Secretary
Garry Brown, Orange County CoastKeeper
Daniel Cozad, SAWPA Acting General
Manager
Marta Hayden, Newport Beach Conference
&Visitors Bureau
Bill Workman, City of Huntington Beach
Douglas C. Traub, Huntington Beach
Conference and Visitors Bureau
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
Comments were made under item 6 below.
(4) RECEIVE FILE AND APPROVE MINUTES OF PREVIOUS MEETING
The minutes of the September 22, 2004 Steering Committee meeting were approved as drafted.
j
Minutes of the Steering Committee
Page 2
October 27, 2004
(5) REPORT OF THE COMMITTEE CHAIR
Committee Chair Steve Anderson introduced our Director from Huntington Beach, Mayor Cathy
Green. Chair Anderson also recognized Doug Davert as the active director for the City of Tustin at
tonight's Board meeting, replacing Tony Kawashima. Director Davert is also appointed to the OMTS
Committee.
Chair Anderson announced the meeting dates for the standing and ad hoc committees. He noted
that, due to the Thanksgiving Holidays, the Board will meet a week earlier next month on November
17th.
Chair Anderson also announced the November 6 christening ceremony for the "Nerissa", our new
Ocean Monitoring Vessel, which will be held at the Newport Harbor Nautical Museum. Attendance is
voluntary and this event is not compensable for Directors.
(6) REPORT OF THE GENERAL MANAGER
General Manager Blake Anderson introduced Daniel Cozad, SAWPA Acting General Manager. Mr.
Cozad thanked the Board for giving Acting General Manager Bob Ghirelli authority to meet with him
and discuss the current litigation between SAWPA and OCSD. General Manager Anderson noted
that this item will be discussed in closed session this evening.
Bob Ghirelli reported that the original estimate on the Labor Day spill was of treated and
disinfected effluent into the Santa Ana River inaccurate. Further recalculation by both staff and
outside experts indicated the spill was approximately 1.6 million gallons. Samples immediately
following the spill showed a spike at the mouth of the Santa Ana River only although, as a
precaution, the beaches were closed from Magnolia in Huntington Beach to 52nd Street in
Newport Beach by the County Health Department soon after it was notified of the event. Dr.
Ghirelli informed the Steering Committee that staff is preparing a report for the Regional Board
next week which will be shared with our Board of Directors. He also informed the directors that
the penalty against the District could be in the $100,000 to $200,000 range. Director Ridgeway
questioned whether further information was received from Edison regarding the helicopter that
purportedly dropped water on the power transformer. Dr. Ghirelli informed that the District has
requested information on the alleged incident but has not received a response. Director
Cavecche noted that the spill incident was an aberrance -the District has not had a spill into the
Santa Ana River in 30 years.
Dr. Ghirelli also reported on the Huntington Beach PR Fund proposal received from the
Huntington Beach Visitors and Conference Bureau. He, Carol Beekman, Bob Ooten, and
Jennifer Cabral met with the group and Mayor Cathy Green to discuss the group's request that
OCSD pay for an advertising campaign to mitigate the bad press coverage received over the last
five years.
Director Tod Ridgeway introduced Douglass Traub, Steve Bone, Garry Brown, and Bill
Workman, representatives of the Huntington Beach Conference &Visitors Bureau and the City
of Huntington Beach. They each requested that the Sanitation District fund the public outreach
campaign to improve the image of Orange County beaches and water quality, and to inform the
public about the measures that have been taken to protect public health. After extensive
discussion, Chair Anderson requested a meeting with Director Tod Ridgeway, Director Cathy
Minutes of the Steering Committee
Page 3
October 27, 2004
Green, and the mayor of Seal Beach, and other interested parties to discuss the concept, after
which he will present his findings to one of the District's standing committees.
Director Jim Ferryman asked whether the District's participation would be a gift of public funds.
Chair Anderson requested General Counsel to offer an opinion on the matter.
General Manager Anderson briefed the Committee on the impact of last night's storm. The Corps of
Engineers regulated the flow in the Santa Ana River at 2500 cfs. Protective rip-rap will be added to
the vulnerable section of the SARI line as soon as the flow in the river subsides. Board Agenda Item
18 will address the emergency repair costs which were originally estimated at$350,000, but are now
estimated at$635,000. This will be presented to the Board tonight.
The two-year transfer of the Sanitation District's property tax was forecast by staff at$16 million in
June and appears to be was on target. Our 2004-2005 budget, approved by the Board in June,
accounts for this loss of revenue.
Director Ridgeway introduced Marta Hayden, Newport Beach Conference & Visitors Bureau.
(7) REPORT OF GENERAL COUNSEL
General Counsel Tom Woodruff reported an additional item has been added to Closed Session, Item
D. The District has received new claims on the Bushard Trunk project.
General Manager Anderson handed out an Ethics Manual for the Steering Committee to review and
decide if it would benefit all Board members to receive a copy.
(8) DISCUSSION ITEMS (Items A-D)
A. State and Federal Legislative Advocacy Update
General Manager Anderson reported that our efforts to secure additional funds
for secondary treatment will continue. Under authority previously granted by the
Board of Directors, Mr. Anderson will renew the three contracts with the District's
lobbyists, subject to a cost reduction for ENS Resources from $180,000 to
$120,000.
B. California Performance Review Update
Dr. Robert Ghirelli, Director of Technical Services, reported the Governor's
California Performance Review (CPR) has completed its hearings and prepared a
report that represents the preliminary analysis and findings of the CPR
Commission. Jim Colston reported that recent news from the commission
indicates the likelihood the SWRCB and RWQCBs may not be eliminated as
originally proposed. Staff will continue to monitor the CPR as it moves to the
Little Hoover Commission.
C. Agenda Items scheduled to be presented to Committees in November were not
reviewed due to time constraints.
D. Agenda Items for Board of Directors Meeting of October 27, 2004 were not
reviewed or considered due to time constraints.
•5•
w
t ,
Minutes of the Steering Committee
Page 4
October 27, 2004
(9) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There was no other business discussed.
(10) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(11) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND/OR STAFF REPORT
There were none.
(12) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday, November 17, 2004, 2004 at 5
p.m.
The next Board Meeting is scheduled for Wednesday, November 17, 2004 at 7 p.m.
(13) CLOSED SESSION
The Committee convened at 6:32 p.m. in Closed Session, pursuant to Sections 54956.8,
54956.9, 54957 or 54957.6, to discuss five items. Minutes of the Closed Session are on file with
the Board Secretary. Confidential Minutes of the Closed Session held by the Steering
Committee have been prepared in accordance with Government Code Section 54957.2, and are
maintained by the Board Secretary in the Official Book of Confidential Minutes of Board and
Committee Closed Meetings. A report of the recommended actions will be publicly reported at
the time the approved actions become final.
At 6:55 p.m., the Committee reconvened in regular session.
(14) ADJOURNMENT
The Chair declared the meeting adjourned at 6:55 p.m.
Submitted by:
Gail Garrett
Committee Secretary
H:dephagendatSteering Committee12 0 041 7 00411 02 704 SC Minutes.5.doc
The OMTS minutes of the meeting held
November 3, '2004 were not available
for this mailing . These minutes will be
distributed at the November 17, 2004
Board of Directors meeting . Once the
minutes are finalized, they will also be
available on the District's website
(www.ocsd .com).
OMTS COMMITTEE Meeting Date To Bd. of Dir.
11/03/04 11/17/04
AGENDA REPORT Item Number Item Number
OMTSO4-56 12 b
Orange County Sanitation District
FROM: Robert J Ooten, Director of Operations and Maintenance
Originator: Nick Arhontes, Manager — Regional Assets and Services
Divisions
SUBJECT: EXTENSION OF CONSULTING SERVICES AGREEMENT WITH
BROWN and CALDWELL CONSULTING FOR WASTE DISCHARGE
REQUIREMENTS (WDR) SUPPORT
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 2 to the Consulting Services Agreement with Brown and
Caldwell Consulting. providing for additional consulting services in connection with the
Santa Ana Regional Water Quality Control Board's newly adopted Waste Discharge
Requirements, for an additional amount of $730,000 to include a $100,000 contingency,
increasing the total amount not to exceed $1 ,430.000 for the time period of January 1 ,
2005 thru December 31 , 2005.
SUMMARY
• The Regional Board adopted Order No. R8-2002-0014 General Waste Discharge
Requirements for Sewage Collection Agencies in Orange County within the Santa
Ana Region and its Monitoring and Reporting Program on April 26, 2002. All OCSD
member cities and sewering agencies are named in the Order and are individually
responsible for their own compliance efforts. Adequate funding of programs is
required by the WDR as well as development of Sewer System Management Plans.
The District has worked closely and cooperatively with city and sewering agency
staff to develop information, data and other products that can be jointly used.
lessening the need to develop products independently.
• This work has been proceeding under this consultant support arrangement to
complete required tasks. Staff recommends extending the present agreement with
Brown and Caldwell due to the continuation of tasks and the consultant's expertise.
Brown and Caldwell staff have acquired knowledge and understanding of the WDR
requirements and the District's workplan, which are an asset to the District.
• Brown & Caldwell was retained on June 26, 2002 to provide consulting services for
the development of OCSD's overall WDR Compliance Plan, including assisting in
the development of our Sewer System Management Plan (SSMP) required by the
Order. Deliverables due to the Regional Board are on a defined schedule shown
below that runs thru September 30, 2005. Based on known and anticipated needs by
OCSD staff, the original agreement was structured thru December 31 . 2004. Staff
has now been able to better forecast their support needs thru the September 30,
2005 period. A contingency period is planned from October thru December 2005 to
allow for any modifications or corrections (if needed) to the District's Program.
H:4feptkagendaOoard Agenda Reports\2004 Board Agenda Reports\1104Utern 12(b).BrownKCaldwell.doc
Revised. 06/04103 Page 1
Sewer System Management Plan Time Schedule per WDR Order
Task Completion Date _
Monitoring and Reporting Program No. R8-2002- Adopted April 26, 2002 —
0014 ongoing effort
SSMP Development Plan and Schedule September 30, 2002-done
SSO Emergency Response Plan January 1, 2003 - done
Preventative Maintenance Program June 15, 2003 - done
Legal Authority July 30, 2004 - done
Grease Disposal Alternatives December 30, 2004
Grease Control Program December 30, 2004
Capacity Evaluation July 30, 2005
Sewer Rehabilitation Plan for Entire System September 30. 2005
Final SSMP September 30. 2005
• Work products developed by Brown & Caldwell are provided as templates or
draft plans for the member cities and sewering agencies to develop their own
WDR deliverables and will continue to be made available to them at no cost. The
Training Program Development deliverables, including WDR awareness training,
are a significant effort for OCSD's staff to co-develop and implement. Once
completed, these products could be made available to the cities and sewering
agencies. This will help achieve and maintain WDR compliance and is expected
to also serve as a regional example for a more unified training program to
improve staff efficiency and knowledge. On-site support for many affected OCSD
Divisions is essential to the success of our development program. To date, the
Brown and Caldwell team has assisted each affected Division in the development
of its own internal work breakdown structure, budget. and schedule.
PRIOR COMMITTEE/BOARD ACTIONS
Board of Directors approved Item 14(d) dated 6/26/02.
PROJECT/CONTRACT COST SUMMARY
Costs incurred to date are within budget and are approximately $635,000.
The requested work tasks, costs and usefulness to member cities and agencies to
complete the SSMP are listed below. An expanded description of each major task is
attached. About two thirds of the planned expenses for usable work products should
also benefit the cities and sewering agencies.
H ldeptlagenda\Board Agenda Reports\2004 Board Agenda Reports11104 item 12(b)BrownBCaldwell doc
Revised- 06/04/03 Page 2
Task Cost & Usefulness
SSO Response Plan and in-channel tasks $ 65,000 Yes
Portable Aeration Plan $ 0 Yes
Training Program Development $ 50,000 Yes
Assist OCSD Divisions with their plans and tasks $ 200,000 No
Assist with SSMP Manual Development and Review $ 10,000 Yes
FOG Treatment Facilities impacts $ 20,000 Yes
Subsurface leakage methodology development $ 175,000 Yes
Provide General Support for overall Program Management $ 65,000 No
Develop SOPs $ 25,000 Yes
Full WDR/cMOM Assessment $ 20,000 Yes
Contingency $100,000 Yes
Total $730,000
BUDGETIMPACT
® This item has been budgeted for FY 04/05. (Line item: Division 420 funded for FY04/05
line 116, Account 53240)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Brown and Caldwell with a staff of 72 members thus far from their national team and
selected sub consultants and service providers, has been supporting OCSD staff,
and indirectly member cities and sewering agencies with implementation tasks and
Waste Discharge Requirement compliance activities including:
o Providing regulatory guidance based on their national experience
o Internal audit and gap analysis support to develop our task level workplan
o Assisting with development of a Sewer System Management Plan (SSMP)
document
o Working with Regional Assets and Services field staff and supervision to develop
Standard Operating Procedures (SOPs) for collection system operation and
maintenance
o Evaluating treatment plant processes and recommending Fats, Oils and Grease
(FOG) disposal alternatives including feasibility of producing a biodiesel fuel
product
o Assisting with the development of training products and staff training in
conjunction with Human Resources Department's Employee
Development/Training Division
o Developing a methodology for estimating and reporting of subsurface pipe
leakage in conjunction with U.C. Irvine researchers
o Assisting staff with preparation of monthly sewage spill reports
o Developing a portable aeration plan for surface waters impacted by sewer spills
H:ldepriagenda'Soard Agenda Reports12004 Board Agenda Reports1110411tenn 12(b).Brown&Caldwell.doc
Revised: 06104/03 Page 3
o Developing a detailed task level plan and coordinating WDR compliance issues
and monitoring milestones for the various Divisions within OCSD and the
General Counsel's office
o Development of audit tools and checklists to assist our internal compliance staff
to prepare self audits
o Assisting staff with our monthly WDR Steering Committee and General Monthly
Meetings for local cities and sewering agencies
o Assisting in the development of improved in-channel spill response, containment
and cleanup methods in conjunction with private sector contractors and the
County of Orange for their flood control channels and related facilities.
• Amendment No. 1 to the Agreement modified a part of section 17 of the Contract
with Brown and Caldwell (Consultant) and inserted a new paragraph as follows:
"Notwithstanding anything contained herein to the contrary, OCSD releases
Consultant and the University of California Irvine (UCI) from the provisions of this
Paragraph with specific reference to the exfiltrometer device (a New Development
resulting from the activity of UCI to develop a subsurface leakage methodology), and
in exchange, OCSD is hereby granted a royalty-free, irrevocable, non-exclusive
commercial license to make, use, and sell any patentable inventions conceived by
UCI related to New Development. Consultant shall not be entitled to any interest in
the intellectual property for the New Developments, all such rights and interest
residing in OCSD and/or UCI."
• The WDR Order currently includes most of the asset management provisions of
EPA's draft SSO Rule's "cMOM" program. OCSD staff feels that if EPA ever issues
the SSO Rule, impacts to our WDR Compliance Programs in order to also meet
EPA's needs are expected to be minimal if any. The Task "Full WDR/cMOM
Assessment" will be performed at that time if needed.
ALTERNATIVES
Based on current staffing levels and expertise, it would not be possible to complete this
project in-house within the schedule in the WDR Order.
CEQA FINDINGS
This type of service work is exempt from CEQA. Any Capital Improvement Projects
(CIP) needed as a result of this program will follow typical OCSD CIP steps including
CEQA review, as required.
ATTACHMENTS
WDR Task Budget Request for July 1, 2004 through December 30, 2005.
H:Wept\agenda\Board Agenda Reports12004 Board Agenda Reports11104Utem 12(b).Brown&Ca1dwe1l.doc
Revised: 06/04/03 Page 4
WDR Task Budget Request for July 1, 2004 through December 30, 2005
WDR Due BC For Task Incurred to Budget
Task Description Date Lead Satelli Comment Nos Date Amend
to Request
Use?
SSO Provide technical resources to evaluate and support 9/30/05 Chung Yes BC completed the 3 147,300 65,000
Response the coordination of spill response procedures Phase 1 report
Plan between OCSD, member Agencies,and County of 11/2003 and began
Orange. Prepare final report on the first phase of the work on Phase 2, in
field effort. Develop uniform contract terms and process.
conditions to allow for third-part response to perform
in-channel spill response. Assist OCSD with bid
document preparation. Coordinate the work among
stakeholders.
Portable Work with OC Health Care Dept and Regional Board 9/30/05 Chung Yes Completed the Plan 9 19,400 -0-
Aeration to identify affected reservoirs,wet lands and/or other on 6/11/04. Future
Plan identified at risk surface waters. Identify rental or role will be to help
purchased equipment, develop contact list and OCSD integrate
approach. Tie implementation phase to SSO into SSO response.
Response Plan (above). Refine the required rental or Budget rolled into
purchased equipment, update contact list and SSO Response
response plan. Plan.
Training and Assess gaps, develop basic needs and Ongoing Damikol Yes Developed the first 4 7,500 50.000
Developmen enhancements for OCSD Worker Competency as training module and
t Program, and assist in procedure development based will begin active
on monitoring OJT and field tasks. staff training in fall
Include high level training in WDR/cMOM Program of 2004.
Compliance to achieve favorable audit findings
agencywide. Includes internal OCSD Auditor training
for SSORP compliance and assist satellites develop
audit team to perform own audits. Define subtasks
and milestone dates for deliverables including CWEA
Certification Program for WDR and OCSD
compliance and CEU program architecture for OCSD
staff.
11/9/2004 Brown and Caldwell Page 1 of 3
WDR Due BC For Task Incurred to Budget
Task Description Date Lead Satelli Comment Nos Date Amend
to Request
Use?
Assistance Work closely with OCSD divisions to implement the 9/30/05 Damikol No To date, BC has 5 96,300 200,000
to OCSD WDR at the divisional level. Work from WDR as worked with OCSD
Divisions document and matrix templates developed to date, Divisions to
and update the templates monthly. Evaluate complete Impacts
progress and assist the divisions with labor, Matrix, and recently
materials, equipment, services as necessary to meet initiated the
WDR deadline. implementation
role.
Assist with SSMP Outline Development and final manual 9/30/05 Arbour Yes SSMP will be a 6 1,100 10,000
development preparation Assist OCSD in developing template for summary document
of SSMP final SSMP including table of contents, desired that primarily
Manual section content, appendix of related OCSD references other
documents such as engineering standards, FOG completed WDR
Pro ram, Ordinances,etc.,and index. work products
FOG Assist OCSD in evaluating pilot study 12/30/04 Fonda No In-Plant FOG 13 25,000 20,000
Treatment recommendations,coordinate with pilot plant vendor Mitigation Study
Impacts to establish location for pilot facility at Plant 1, was completed
evaluate pilot plant operation,and advise OCSD as to 06/03 and has
lon -term feasibility. been published.
Subsurface Develop reporting process for SSO leaks 04/01/05 Esmond Yes Work thus far has 10 156,700 175,000
Leakage (exfiltration), included as part of Monitoring and resulted in
Methodology Reporting requirement. Partner with UCI research development of
team to provide literature research,develop process exfiltrometer.
to quantify exfiltration using exfiltrometer device, Additional field
CCTV and other inspection and testing processes testing necessary
and subsequent repair, rehab, replacement strategy. for quantification.
General Overall Program Management. Proposed WDR and Ongoing Esmond Yes Ongoing active role 12 140,000 65,000
Program cMOM document review,task definition and budgets, in WDR meetings,
Support overhead support, general review and coordination with
correspondence,general facilitation, non-task related stakeholders and
Project Manager's time. Strategies to leverage agencies, assist in
deliverables for possible use by OCSD Satellites. making WDR tools
Assist in developing presentation materials for and deliverables
management and OCSD Board use. Assistance in accessible.
compiling annual satellite data and SSO reporting.
11/9/2004 Brown and Caldwell Page 2 of 3
WDR Due BC For Task Incurred to Budget
Task Description Date Lead Satelli Comment Nos Date Amend
to Request
Use?
Develop Develop Standard Procedures. This task supports Ongoing Myers Yes Have developed 13 11 21.400 25.000
SOPs training. Review WDR language to identify specific SOPs in final form
areas where training is required. Identify Standard to date, plan to
Procedures and compare to existing list, modify and complete 12 more.
prioritize. Prepare draft SOPs for OCSD review,
modify and revise. Provide video capture for SOP
activity and to aid in training.
Full WDR/ Using WDR document and matrix templates based Ongoing Arbour Yes Ongoing, providing 8 20,500 20,000
cMOM on cMOM language, modified and expanded for PM tools, 7
Assessment WDR,focus on labor, materials, equipment, services regulatory and
and procedure/documentation needs. Review for technical
impact on other tasks. Provide peer review for FOG assistance.
program develo ment and integration into SSMP.
Contingency --- 100,000
Total 635,200 730,000
H:\dept\om\810\fieldsWGENDA\Agenda Report Attachment Brown and Caldwell WDR Task Table(10-19-04).doc
11/9/2004 Brown and Caldwell Page 3 of 3
OMTS COMMITTEE Meeting Date To Bd. of Dir.
11/03/04 11/17/04
AGENDA REPORT Item Number Item Number
OMTSO4-55 12 c
Orange County Sanitation District
FROM: Robert P. Ghirelli, D.Env., Director of Technical Services
Originator: Layne Baroldi, Legal & Regulatory Affairs Liaison
SUBJECT: Memorandum of Understanding with South Orange County
Wastewater Authority for Phase I of Implementation of Enclosed
Composting Facility
GENERAL MANAGER'S RECOMMENDATION
Approve Memorandum of Understanding with South Orange County Wastewater
Authority for Phase 1 of the South Orange County Composting Facility for an amount
not to exceed $69,637, to be shared equally with South Orange County Wastewater
Authority, in a form approved by General Counsel.
SUMMARY
• For the past two years. SOCWA and OCSD have been working with the Orange
County Integrated Waste Management Department's (OCIWMD) Biosolids
Committee to site an enclosed biosolids and greenwaste composting facility at
the Prima Deshecha Landfill in South Orange County.
• The proposed "South Orange County Composting Facility" (Project) would take in
approximately 100 to 110 tons of Class B biosolids daily from OCSD and
SOCWA and combined with like amounts of wood chips and yard trimmings to
produce approximately 65 to 75 tons of compost per day.
• OCSD and SOCWA jointly propose this composting program as an
environmentally responsible alternative to landfilling beneficial organic materials.
• In order to facilitate the development of the Project, staff from both agencies
recommends that the MOU be entered into by OCSD and SOCWA.
• The purpose of the MOU is to set forth certain understandings of SOCWA and
OCSD in order to formalize a cooperative partnership for the implernentation of
the Project.
• The MOU memorializes a 50-50 participation commitment of SOCWA and OCSD
in the Project, and consent to initiate and fund the tasks for the initial planning,
permitting and concept design of the Project. The MOU states that SOCWA and
OCSD will be partners in the Project, each with a fifty percent (50%) interest.
• The MOU expresses SOCWA's and OCSD's intent to enter into a more detailed
agreement at a later time setting forth ownership interests, financial commitments
and other critical terms to carry out the final planning, design build and/or
construction and operation of the Project.
LB:Wh
H\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1104\I1em 12(c)South OC Wastewaler docLB
Revised 10/20104 FINAL(wh) Page 1
• Staff from both SOCWA and OCSD will review and approve contracts for
services and work in connection with the Project development tasks before such
contracts are awarded and/or executed by SOCWA, which shall be executed in
both SOCWA's name and "on behalf of OCSD."
• SOCWA will act as the lead agency on behalf of itself and OCSD and execute
contracts to carry out the Project's Phase 1 Tasks.
• OCSD and SOCWA will continue to work closely with OCIWMD as the project
moves forward.
• SOCWA and OCSD are committed to the efficient, beneficial recycling of their
respective biosolids products. The Project will further this common goal and
produce a biosolids product for use as a soils amendment in the SOCWA and
OCSD service areas and beyond.
PRIOR COMMITTEE/BOARD ACTIONS
Action requested consistent with the receipt and filing of the Long-Range Biosolids
Management Plan, December 2003.
PROJECT/CONTRACT COST SUMMARY
The total cost for Phase 1 of the South Orange County Composting Facility entitled
"Project: Feasibility Assessment, Prima Deshecha Composting Facility"will not exceed
369,637. OCSD would be responsible for 50% of this total cost. Upon the
determination of the feasibility of the project. staff would make a recommendation to the
OMTS Committee whether or not to pursue subsequent phases of the Projects
development.
BUDGETIMPACT
This item has been budgeted. (Line item: CAP. Section 8. Page 146)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION N/A
ALTERNATIVES
This proposal is consistent with the OCSD's Long-Range Biosolids Management Plan.
CEQA FINDINGS
The required CEQA analysis will be performed as directed by the OCIWMD.
ATTACHMENTS N/A
LB:wh
H 1dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1104\ttem 12(c)South OC Wastewater docLB
Revised; 10/20/04 FINAL(wh) Page 2
The PDC minutes of the meeting held
November 4, 2004 were not available
for this mailing . These minutes will be
distributed at the November 17, 2004
Board of Directors meeting . Once the
minutes are finalized , they will also be
available on the District's website
(www.ocsd .com).
PDC COMMITTEE Meeting Date To Bd.of Dir.
11/04/04 11/17/04
AGENDA REPORT Item Number Item Number
PDC04-89 13 b
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Hardat Khublall, CIP Project Manager
SUBJECT: WARNER AVENUE RELIEF SEWER, CONTRACT NO. 11-22
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 5 to Warner Avenue Relief Sewer, Contract No. 11-22, with
ARB, Inc., authorizing a deduction of $308,378, decreasing the total contract amount to
$5,198,580.
SUMMARY
Background
• This project, located in the City of Huntington Beach, consists of improvements to
relieve hydraulic deficiencies on two separate reaches of the existing Warner
Avenue Relief Sewer and to relieve deficiencies in the overall drainage basin
tributary to that trunk sewer. The 1999 Strategic Plan identified these two reaches of
the Warner Avenue Relief Sewer as hydraulically deficient and in need of
replacement.
• Tetra Tech, Inc. prepared the plans and specifications and the construction contract
was awarded to ARB, Inc. on May 28, 2003.
• This Change Order is for the Adjustment of Engineer's Quantities. There are no
errors or omissions associated with this Change Order. The contract includes
liquidated damages of $750 per day and no bonus provisions.
PRIOR COMMITTEE/BOARD ACTIONS
Contract Schedule
Contract start date July 9, 2003
Original contract completion date September 2, 2004
Total number of change orders to date 5
Current contract completion date October 3, 2004
Revised completion date October 3, 2004
Days subject to liquidated damages N/A
Liquidated damages assessment N/A
Revised 06104/03 Page 1
PROJECT/CONTRACT COST SUMMARY /
Change Order No. 5 Content
Item No. Description Amount Days Type
Adjustment of Engineer's
1 Quantities $(308378.) 0 Other
TOTAL — CHANGE ORDER NO. 5 $(308,378) 0
Job Completion
This contract in now 100% complete.
PRIOR COMMITTEE/BOARD ACTIONS
This contract was awarded by the Board of Directors on May 28, 2003. Please refer to
the attached Change Order Status Report for more information on previous change
orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 5,089,040
Previously Authorized Changes $ 417,918
This Change Order (Deduct) $ (308,378)
Change Orders to Date $ 109,540
Percent Increase to Date 2.15%
Amended Contract Price $ 5,198.580
BUDGETIMPACT
El This Item has been budgeted. (Line item: FY 04/05, Section 8, Page 46. Capital
Improvement Program, Collections Facilities Relief Sewer. Contract No. 11-22)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
None
ALTERNATIVES
None
Revised 06/04/03 Page 2
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program Environmental Impact
Report certified on October 27, 1999. A Notice of Determination was filed on
October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
HK:bp:lc:eh:lc
HAntglobal\Agenda Draft Reports\PDC\11-22 AR CO#5
Revised 06/04103 Page 3
BUDGET INFORMATION TABLE
WARNER AVENUE RELIEF SEWER
CONTRACT NO. 11-22, C.O. #5
24
-E'i 4-
.
�,l 50 .012
�M-
EWA N i""Ki,
SEQ dEd
-T.
-ROPO
pp
!R0P06i:lW
wl,
El
j TOTAL xprlNbE
.4I3 )W 9191"TIP
QG
T
MOM
j ffl
U
IN
wATE°Co
- pi vss
KN..I<,
VS.
4 VE id, Ei-I
Phase 1 -Project Development $ 10,200 $ 54,000 $ 54,000 $ 54,000 $ 54.000 $ 53,441 99%
Phase 2-Preliminary Design $ 10,000 $ 6,000 S 6,000 $ 6,000 $ 6,000 $ 4,859 81%
Phase 3-Design $ 400,000 $ 750,000 $ 750,000 750,000 $ 750,000 $ 736,700 98%
is
Phase 4-Construction $ 2.696,600 $ 6,345,684 $ 308,378) $ 6,037,306 n', $ 6,345,684 $ 6,345 664 $ 5,978,094 94%
Phase 5-Commissioning $ 128,000 $ 128,000 S 128,000 $ 55,000 $ 55.000 $ 21,672 39%
Phase 6-Close-Out $ 37,000 $ 37,000 S 37,000 $ 14,000 $ 14,000 $ 7,313 52%
Phase 7-Contingency $ 929.500 . $ 159,316 . S, .308,378 S 467,694 $
PROJECT TOTAL $ $$ 4,211,300 $ 7,480.000 7,480,000 $ 7,224,684 S 7,224,6841 $ 6,802,0791 94%
1
:x
0 1]Reimbursable Costs $ 1 $ T$ 10,0001 $ 10,0001 100%
10,000 0,000 1 1 S 10,0C
$ T$ 7,214,684 $
$ '?j $ 6,792,0791 94%
PROJECT NET 1 $ 4,211,300 $ 7,470,000 7,470.000 7,214,684 S
PSA/Contract
Design PSA $ 282.479 $ 440,979 S 440,979 $ 440,979 $, $ 440,9791 $ 401,900 1 91%
K.
Construction Contract $ 5,089,040 $ 5,506.958 $� (308,3780 S 5,198 5,506.958 $ 308.278) $ 5.198 58n S 4,636,673 89%
EDMS:003781272
CHANGE ORDER STATUS REPORT
WARNER AVENUE RELIEF SEWER
CONTRACT NO. 11-22
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(DAYS) (DAYS)
CONTRACT 7/9/2003 $5,089,040 $5,089,040 420 420
CO NO. 1' 11/10/2003 $153,000 $5,242,000 3.01% 10 430
CO NO. 2 4/28/2004 $182,109 $5,424,149 6.58% 23 453
CO NO. 3 7/21/2004 $35,193 $5,459,342 7.28% 0 453
CO NO 4 9/27/2004 $47,616 $5,506,958 8,21% 0 453
CO NO.5 Pending ($308,378) $5,198,580 2.15% 0 453
`Approved by PDC Committee per delegated authority by Board Resolution 99-23
EDMS:003778617
e
Page 1 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB, INC. C.O. No. Five 5
Date: November 17, 2004
Job: WARNER AVENUE RELIEF SEWER, CONTRACT NO. 11-22
Consultant: TETRA TECH, INC
Amount of this Change Order(Deduct)$(308,378)
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 —ADJUSTMENT OF ENGINEER'S QUANTITIES
Additions:
Item Unit Description From To Diff U.P. Total
9 LF 8-in VCP Sewer Pipe 425 512 87 $220 $19,140
16 VF 60-inch Manholes 101 105.87 4.87 700 3,409
35 LF Relining 24-inch sewer 1143 1542 399 140 55,860
pipe
36 EA Rehabilitate existing 4 5 1 2,500 2,500
manholes, remove and
replace cone and lid
Subtotal $80,909
Deductions:
Item Unit Description From To Diff U.P Total
4 CY Excavation of 500 384 (116) 40 $ (4,640)
unsuitable material
6 LF 21-inch VCP sewer 3404 3380 (24) 380 (9,120)
pipe
7 LF 24-inch VCP sewer 86 46 (40) 350 (14,000)
pipe
8 LF 36-inch VCP sewer 324 154 (170) 450 (76,500)
pipe
12 LF 18 & 20-inch siphon
HDPE and 56-inch 239 179.25 (59.75) 1100 (65,725)
steel casing
15 LS 1 '/2- inch gas line 3000 0.00 (3000) 3000 (3,000)
relocation
17 VF 60-inch drop manholes 149 142.40 6.60 500 3,300
19 VF 48-inch manholes (City 54 47.50 6.50 300 1,950
9
Page 2 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB, INC. C.O. No. Five 5
Date: November 17, 2004
Job: WARNER AVENUE RELIEF SEWER, CONTRACT NO. 11-22
Consultant: TETRA TECH, INC
of H.B.
22 VF 72-inch manholes 57 44.08 12.92 700 9,044
23 LS 84-inch manholes 18000 0.00 (18000) 18000 (18,000)
25 SF Trench pavement 30000 28327 (1673) 7 (11,711)
restoration
31 SF Isolated pavement 20000 7181 (12819) 6 (76,914)
restoration
33 LS Video detections stem 50000 14017 35983 50000 35,983
37 EA Rehabilitation of 5 3 (2) 2200 (4,400)
existingmanholes
38 EA Point repair existing 2 0 (2) 8000 (16,000)
sewer 5-ft to 10-ft
39 EA Point repair existing 2 0 (2) 12000 (24,000)
sewer 10-ft to 15-ft
43 LS CCTV prior to 15000 0 (15000) 15000 (15,000)
ex iration of warranty
Subtotal $(389,287.00)
TOTAL DEDUCT THIS CHANGE ORDER: $(308,378.00)
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 3 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB, INC. C.O. No. Five 5
Date: November 17, 2004
Job: WARNER AVENUE RELIEF SEWER, CONTRACT NO. 11-22
Consultant: TETRA TECH, INC
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that no time is required
for this Change Order, and no direct or indirect, incidental or consequential costs, expenses, losses or
damages have been or will be incurred by Contractor, except as expressly granted and approved by
this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: July 9, 2003
Original Contract Time: 420 Calendar Days
Original Completion Date: September 2, 2004
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: 33 Calendar Days
Revised Contract Time: 453 Calendar Days
Revised Final Completion Due Date: October 3, 2004
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: October 3, 2004
Original Contract Price $ 5,089,040.00
Prev. Authorized Changes $ 417,918.00
This Change (Deduct) $ (308,378.00)
Amended Contract Price $ 5,198,580.00
s'
Page 4 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB, INC. C.O. No. Five 5
Date: November 17, 2004
Job: WARNER AVENUE RELIEF SEWER, CONTRACT NO. 11-22
Consultant: TETRA TECH, INC
Board Authorization Date: November 17, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Hardat Khublall,
CIP Project Manager Date
Approved by:
David A. Ludwin, P.E.
Director of Engineering Date
Accepted by:
ARB, INC.
Contractor Date
EDMS:003781689
PDC COMMITTEE Meeting Date To Bd.of Dir.
11/04/04 11/24/04
AGENDA REPORT Item Number Item Number
PDC04-90 13(c)
Orange County Sanitation District
FROM: David A. Ludwin, Director of Engineering
Originator: Hardat Khuball, CIP Project Manager
SUBJECT: GISLER-REDHILL TRUNK IMPROVEMENTS, REACH "A", CONTRACT
NO. 7-36; ORANGE TRUNK IMPROVEMENTS, CONTRACT NO. 7-39;
GISLER-REDHILL/NORTH TRUNK IMPROVEMENTS, CONTRACT
NO. 7-41: AND CITY OF TUSTIN PROJECT NOS. 6106 AND 6151
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 1 to Gisler-Redhill Trunk Improvements, Reach "A", Contract
No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk
Improvements, Contract No. 7-41; and City of Tustin Project Nos. 6106 and 6151, with
ARB, Inc., authorizing an addition of $349,612 and 20 calendar days, increasing the
total contract amount to $18,725,611.
SUMMARY
Background
• Contract No. 7-41, located in the City of Tustin, City of Orange, and the County of
Orange consists of improvements to relieve hydraulic deficiencies on the Gisler-
Redhill North Trunk Sewer in Newport Avenue, El Camino Real, and Prospect
Avenue. Contract No. 7-39 is located in the City of Tustin and the County of
Orange, consists of improvements to relieve hydraulic deficiencies on the Orange
Trunk Sewer in Holt Avenue, 17th Street, and Hewes Avenue. Contract No. 7-36,
located in the City of Tustin, consists of improvements to relieve hydraulic
deficiencies on the Gisler-Redhill Trunk Sewer Improvements in Redhill Avenue from
Mitchell to La Colina. The 1999 Strategic Plan identified this reach of sewer as
hydraulically deficient and in need of replacement.
• AKM Consulting Engineers prepared the plans and specifications and the
construction contract was awarded to ARB, Inc. on January 28, 2004.
• Change Order No. 1 includes eight items of added work to Contract No. 7-41 and
Contract No. 7-39. There are six design changes, and four changed conditions in
this Change Order. The contract includes liquidated damages of $1000 per day and
no bonus provisions.
Page 1
Contract Schedule
Contract start date April 7, 2003
Original contract completion date November 24, 2005
Total number of change orders to date 1
Current contract completion date November 24, 2005
Revised completion date December 14. 2005
Days subject to liquidated damages N/A
Liquidated damages assessment N/A
Change Order No. 1 Content
Item No. Description Amount Days Type
1 Adjustment of Engineer's $180,000 20 Design Change
Quantities
2 Abandoned Line Removal 22,894 0 Changed
Condition
3 Material Price Difference for City 1,552 0 Design Change
of Tustin Project No. 6151
4 Time Extension for City of Tustin 0 200 Design Change
Project No. 6151
5 Utility Impacts in Old Town 5,938 0 Changed
Condition
6 Additional Casing on Main 28,513 0 Changed
Street Condition
7 Undisclosed Concrete Culvert 20,888 0 Changed
Condition
8 Modification to 17" Street Traffic 52,142 0 Design Change
Control Plan
9 Mobilization to Hewes Middle 22,166 0 Design Change
School
10 Additional Lateral @ Tustin 15,519 0 Design Change
Water Plant
Total — Change Order No. 1 $349,612 20
Item 1 - This item is an Adjustment of Engineer's quantities for additional house
connections that were not identified on the original contract drawings. After contract
award. the design was changed to include additional properties with septic systems for
connection to the District's trunk sewer.
Item 2 - This item is for removal of interfering portions of existing abandoned water
lines. This changed condition exists because the abandoned irrigation lines were not
shown on the City of Tustin's record drawings.
Page 2
d
Item 3 - This item compensates the Contractor for extra costs associated with a change
in materials for water valves requested by the City. This design change increases the
durability of the valves.
Item 4 - This item extends Milestone No. 1 for waterline construction in the City of Tustin
by 200 calendar days. This design change allows the Contractor to improve
coordination between waterline and sewer work, thereby minimizing public impacts.
This milestone time extension does not extend the final completion date of the contract.
Item 5 - This item compensates the Contractor for excavation work around two
undisclosed utilities, and removal of slurry encasement around a storm drain. This
changed condition exists because the utilities were not shown on the City of Tustin's
record drawing and the slurry around the storm drain was encountered outside of the
trench zone.
Item 6 - This item is for the installation of steel casing to avoid disturbance of an existing
trust block on a waterline. This changed condition exists due to the location of the trust
block protruding into the trench zone of the new sewer line.
Item 7 - This item is for the removal of an undisclosed concrete culvert to make way for
the proposed sewer. This is a changed condition because the culvert was abandoned
over 50 years ago and was not shown on any record drawings.
Item 8 - This item is for changes to the contract traffic control plans. This design
change was initiated by the County in order to provide improved traffic flow through the
intersections and to increase public safety in the traffic controlled zones.
Item 9 —This item is for Contractor mobilization costs associated with a contract
sequence change. This design change was requested by the public in conjunction with
the school district to take advantage of the summer months when school was not in
session, thereby minimizing disturbance.
Item 10 - This item compensates the Contractor for costs associated with the installation
of an additional sewer lateral to the City of Tustin Water Plant. This design change was
requested by the City to prevent surcharging of the existing sewer.
Job Completion
The contract is now 25% complete.
PRIOR COMMITTEEIBOARD ACTIONS
Construction Contract was approved by the Board on January 28, 2004, for a lump sum
of$18,375,999.
Page 3
9
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 18,375,999
Previously Authorized Change Order $ 0
This Change Order (Add) $ 349,612
Change Orders to Date $ 349,612
Percent Increase to Date 1.9%
Amended Contract Price $ 18,725,611
BUDGETIMPACT
® This item has been budgeted. (Line item: Contract No. 7-41 FY 04/05, Section 8, Page 43,
Contract No. 7-39 FY 04/05, Section 8, Page 41 Capital Improvement Program, Collections
Facilities, Facilities Engineering Projects-Collections)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
None
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program Environmental
Impact Report certified on October 27, 1999. A Notice of Determination was filed
on October 29, 1999.
ATTACHMENTS
1. Budget Information Table - 7-41
2. Budget Information Table - 7-39
3. Change Order Status Report
4. Change Order
5. Location and Photo Description of Change Order No.1
TD:Ic:eh
H:lntglobakAgenda Draft ReportslPDC17-36,et all C01-110304.doc
Page 4
BUDGET INFORMATION TABLE
GISLER-REDHILUNORTH TRUNK IMPROVEMENTS
CONTRACT NO. 7-41
k 'R ui t Ul,"iWR
7i, 4T.R.1imlE. M
FUNDS"
r
THORME6
Y A A 11,,
r" DO
ti.011.1
H A_
U 1.1—PY Eli I
....... lE U;
v
A.,
01��U T _,�,�U
Phase 1 -Project Development $ 45,000 S 39,484 $ 39,484 S 39,484
$ 39,484 $ 39,484 100%
Phase 2-Preliminary Design S 1,126 $ 1,126 S 1,126 1,126 $ 1,933 172%
Phase 3-Design 465,000 S 627,633 627,633 S 627,633 $ 627,633 $ 632,689 101%
Phase 4-Construction S 13,600,000 $ 13,126,689 $ 238,897 $ 13,365,586 S 13.126,689 $ 238,897 $ 13,365.586 $ 2,937,041 22%
Phase 5-Commissioning 183,581 183,581 S 183,581 183,581 $ 14,340 8%,
Phase 6-Close-Out $ 45,615 $ 45 615, 45,615 $ 45.615 3,305 7%
Phase 7-Contingency 2,206,000 $ 1,334,491 $ (238,897) $ 1,095,594
IPROJECT TOTAL $ 16,316,000 S 15,358,6191 $ $ 15,358,61]9 �-A 114�
S 14,024,128 , $ 238,897 , $ 14,263,025, $ 3,628,793, 25%
lReimbursable Costs 665,211 1 $ 665,211 1
15,358,619 S 13,358,91 $ 3,628,793 27%
PROJECT NET $ 16,316,000 1 S 15,358,619 1 71 236,8971 13,597,814 $
PSA/Contract
Design PSA I S 368,6841 $ 382,1761 382,176 382,176
lConstruction Contract S 13,600,000 $ 10,250.052 $ 10,250,052 10,250,052 238,897 10,488,9491 $ 234,2291 2%
EDMS ITEM V:003780980
BUDGET INFORMATION TABLE
ORANGE TRUNK IMPROVEMENTS
CONTRACT NO. 7-39
u
21 14".'a'. �4 U M
IV
-4 -4 -'r -1 R
� I��EUMII�--evl'�'�;3.
b��N�`VtMle amo' 2�4.' � '.14! li-vap
�#Rbpbskm
Fly !�D 11"lif...","S1.',mwR
M11-111 W-111-11
IT A0
1'di It" PiRml,- R-Ou"TEaPR
'1A. ..0 jig" to
3 10110
W
q
E
'M TJE T
ngy mp
g
x. "'r INA.
p,
H1
Phase 1 -Project Development $ 37,000 S 46,388 $ 46,388 $ 46,388 $ 46,388 $ 46,388 100%
Phase 2-Preliminary Design $ 550 S 550 t", $ 550 $ 550 $ 1,391 253%
Phase 3-Design 326,000 $ 395,649 S 395,649 395,649 395,649 $ 411,471 104%
Phase 4-Construction S 4,718,000 S 4,251,625 110,715 S 4,362,340 $ 4,251,625 110,715 $ 4,362,340 $ 1,962,537 45%
Phase 5-Commissioning
$ 61,735 $ 61,735 $
Phase 6-Close-Out $ 15,434 S 15,434
Phase 7-Contingency $ 759,000 $ 526,671 S (110,715) S 415,956 $
�14
PROJECT TOTAL $ 5,840,000 $ 5,298,052 $ S 5,298,052 4,694,212 $ 110,715 4,804,9271 $ 2,421,786 1 50%
iReimbursable Costs F.
1PROJECT NET $ 5,840,000 1 $ 5,298,0521 $ -1 S 5,298,052 $ 4,694,212 1110,715] $ 4,804.927 $ 2,421.786 50%
PSA/Contract
Design PSA $ 224,0981S 236,641 1'* $ 236,641 as
Construction Contract $ 4,718,000 $ 4,1113,733 : " $ 4,113,733 y $ 4,113,733 110,715 $ 4,224,448 $ 26,314 %
EDMS ITEM ID:003780981
CHANGE ORDER STATUS REPORT
GISLER-REDHILL TRUNK SEWER IMPROVEMENTS, ORANGE TRUNK SEWER IMPROVEMENTS, AND
GISLER-REDHILL NORTH TRUNK SEWER
CONTRACT NOS. 7-36, 7-39, AND 7-41
AND CITY OF TUSTIN PROJECT NUMBERS 6106 AND 6151
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE-
(DAYS) (DAYS)
CONTRACT 1/28/2004 $18,375,999 $18,375,999 0.00% 600 600
CO NO. 1 Pending $349,612 $18,725,611 1.90% 20 620
EDMS:003780190
Q
Page 1 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB Inc. C.O. No.: One 1
Date: November 17, 2004
Job: Gisler Redhill North Trunk Sewer, Reach "A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39;Gisler Redhill/North Trunk Sewer Improvements;
Contract No. 7-41: and City of Tustin Project Numbers 6106, and 6151
Consultant: AKM
Amount of this Change Order (Add) $349,612.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation,the following additions to or deductions
from the contract price are hereby approved.
Contract No. 7-41
ITEM 1 —ADJUSTMENT OF ENGINEER'S QUANTITIES: ADDITIONAL HOUSE CONNECTIONS
This item is an adjustment to Engineer's quantities for 40 additional house connections that were not
identified on the original contract drawings. Public requests and expected future property
developments required the connections. A time impact analysis was submitted by the Contractor
justifying the request for a contract time extension for the additional work. This item was negotiated
with the Contractor pursuant to Section 44(B)l of the General Requirements (Reference FCO-741-
001).
ADDITIONS
Item No. Unit Description From To Difference Unit Price Total
54 Each House Connections 99 139 40 $4,500 $180,000
ADDED COST THIS CHANGE ORDER ITEM: $180,000.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 20 Calendar Days
ITEM 2—ABANDONED LINE REMOVAL
This item is for extra labor, equipment and material required to remove 700-feet of interfering portions
of abandoned two-inch and five-inch water lines between Sewer Stations 11+00 and 19+00 on
Newport Avenue. These lines were not shown on the City of Tustin's record drawings. The extra
work consisted of excavating, pipe removal, and disposal. This item was negotiated with the
Contractor force account in accordance with Division 1, Section 44(B)2 of the General Requirements
(Reference FCO-741-002).
ADDED COST THIS CHANGE ORDER ITEM: $22,894
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
D
Page 2 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB Inc. C.O. No.: One 1
Date: November 17, 2004
Job: Gisler Redhill North Trunk Sewer, Reach "A". Contract No. 7-36; Orange
Trunk Improvements,Contract No.7-39;Gisler Redhill/North Trunk Sewer Improvements;
Contract No. 7-41; and City of Tustin Project Numbers 6106, and 6151
Consultant: AKM
ITEM 3—MATERIAL PRICE DIFFERENCE FOR CITY OF TUSTIN CONTRACT 6151
This item is to compensate the contractor for the extra costs associated with a change in materials for
water valves. The contract requires brass component valves, but the City of Tustin required an
upgrade to stainless steel. This item was negotiated with the Contractor pursuant to Section 44(B)1
of the General Requirements (Reference FCO-741-003).
ADDED COST THIS CHANGE ORDER ITEM: $1,552.
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4—TIME EXTENSION FOR CITY OF TUSTIN CONTRACT 6151
This item extends the Milestone No 1 time duration, which constrains the construction duration for the
waterline work in the City of Tustin, by 200 calendar days. The time extension will allow for the
Contractor to complete the waterline work concurrently with the sewer line along Prospect Avenue
which will minimize impacts to the public. The duration is added to the interim milestone only and will
not extend the final contract completion date. This item was negotiated with the Contractor pursuant
to Section 44(B)1 of the General Requirements (Reference FCO-741-004).
ADDED COST THIS CHANGE ORDER ITEM: $0.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 5— UTILITY IMPACTS IN OLD TOWN
This item is for labor, equipment, and material required excavating around two undisclosed utilities,
that included removal of an interfering gas line and also removal of an undisclosed slurry encasement
underneath a storm drain between Sewer Stations 24+00 and 37+00 on El Camino Real. This item
was accomplished by the Contractor's force account in accordance with Division 1, Section 44 (B)2 of
the General Requirements (Reference FCO 741-005).
ADDED COST THIS CHANGE ORDER ITEM: $5,938.
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Q
Page 3 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB Inc. C.O. No.: One 1
Date: November 17, 2004
Job: Gisler Redhill North Trunk Sewer. Reach "A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-41: and City of Tustin Project Numbers 6106, and 6151
Consultant: AKM
ITEM 6—ADDITIONAL CASING ON MAIN STREET
This item is for labor, equipment, and material required for installing 14-feet of 42-inch diameter
casing at Sewer Station 43+20. The casing was required to avoid disturbing a thrust block on an
existing six-inch water main. The work consisted of excavating, installation of the casing, and removal
of soil inside the casing. This item was negotiated with the Contractor pursuant to Section 44(B) 1 of
the General Requirements (Reference FCO-741-006).
ADDED COST THIS CHANGE ORDER ITEM: $28,513
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Contract No. 7-39
ITEM 7— UNDISCLOSED CONCRETE CULVERT
This item is for labor and equipment to remove a portion of an undisclosed concrete culvert at Sewer
Station 100+00. The culvert was interfering with the installation of the proposed sewer. The extra
work consisted of potholing to determine the limits of the structure, standby time for investigation,
excavation, removal, and disposal of the structure. This item was accomplished by the Contractor's
Force Account in accordance with Division 1, Section 44(13)2 of the General Requirements
(Reference FCO-739-006).
ADDED COST THIS CHANGE ORDER ITEM: $20,888
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 8— MODIFICATIONS TO 17T" STREET TRAFFIC CONTROL PLAN
This item is for labor, equipment, and material required modifying the existing approved traffic control
plan for 17th Street between Holt Avenue and Newport Avenue. The County of Orange made
modifications to the traffic control set-up after the Contractor had placed the k-rail and all other
appurtenant traffic control devices. The County of Orange did not feel comfortable with the traffic flow
during night hours with the taper and grade separation within the Holt and Esplanade intersections.
Two thousand feet of street striping had to be removed to accommodate the new traffic lane locations.
The taper between Holt Avenue and Esplanade Street had to be extended by approximately 300-feet
in order to provide a smoother transition for the posted speed limit. The County of Orange also
9
Page 4 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB Inc. C.O. No.: One 1
Date: November 17, 2004
Job: Gisler Redhill North Trunk Sewer, Reach "A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements:
Contract No. 7-410 and City of Tustin Project Numbers 6106, and 6151
Consultant: AKM
required shoulder improvements with cars being so close to the edge of the pavement. Additional
signs for the bike path and detours were provided to safely detour bikers through the construction
zone. This item was negotiated with the Contractor pursuant to Section 44(B) 2 of the General
Requirements (Reference FCO-739-007).
ADDED COST THIS CHANGE ORDER ITEM: $52,142
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 9— MOBILIZATION TO HEWES MIDDLE SCHOOL
This item is for Contractor mobilization costs associated with a contract sequence change. The
Contractor was directed to shift its operation to the area in front of Hewes Middle School. This
design change was requested by the public in conjunction with the school district in order to take
advantage of the summer months when school was out of session. This item was negotiated with the
Contractor pursuant to Section 44(B) 1 of the General Requirements(Reference FCO-741-003).
ADDED COST THIS CHANGE ORDER ITEM: $22,166
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 10—ADDITONAL LATERAL AT TUSTIN WATER PLANT
This item compensates the Contractor for costs associated with the installation of an additional sewer
lateral for the City of Tustin Water Plant. This additional work was requested by the District to prevent
surcharging of the existing sewer downstream of the plant. The additional work consisted of traffic
control, pavement removal, excavation, shoring, sewer installation, backfill, and final paving. This
item was negotiated with the Contractor pursuant to Section 44(B) 1 of the General Requirements
(Reference FCO-739-009).
ADDED COST THIS CHANGE ORDER ITEM: $15,519
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL COST THIS CHANGE ORDER: $349,612
TOTAL TIME EXTENSION THIS CHANGE ORDER: 20 Calendar Days
�e
Page 5 of 6
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB Inc. C.O. No.: One 1
Date: November 17, 2004
Job: Gisler Redhill North Trunk Sewer, Reach "A". Contract No. 7-36: Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements;
Contract No. 7-41: and City of Tustin Project Numbers 6106, and 6151
Consultant: AKM
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that a 20 day extension
of time to perform the work is required for this Change Order, and that no direct or indirect, incidental
or consequential costs, expenses, losses or damages have been or will be incurred by Contractor,
except as expressly granted and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: April 7, 2004
Original Contract Time: 600 Calendar Days
Original Completion Date: November 24, 2005
Time Extension this C.O.: 20 Days
Total Contract Time Extension: 20 Days
Revised Contract Time: 620 Calendar Days
Revised Final Completion Due Date: December 14, 2005
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: N/A
Original Contract Price $18,375,999.00
Prev. Authorized Changes $ 0.00
This Change (Add) $ 349,612.00
Amended Contract Price 18 725 611.00
Page 6 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB Inc. C.O. No.: One 1
Date: November 17, 2004
Job: Gisler Redhill North Trunk Sewer, Reach "A". Contract No. 7-36; Orange
Trunk Improvements,Contract No.7-39:Gisler Redhill/North Trunk Sewer Improvements;
Contract No. 7-41; and City of Tustin Project Numbers 6106, and 6151
Consultant: AKM
Board Authorization Date: November 24, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
John D. Linder, P.E. Date
Construction Manager
Approved by:
David A. Ludwin P.E. Date
Director of Engineering
Accepted by:
ARB, INC.
Contractor Date
EDMS: 003781050
PDC COMMITTEE Meeting Date To Bd.of Dir.
11/04/04 11/17/04
AGENDA REPORT Item Number Item Number
PDC04-91 13(d)
Orange County Sanitation District
FROM: David Ludwin. Director of Engineering
Originator: Larry Rein. Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION, JOB NO. 1-2-4
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 10 to Bushard Trunk Sewer Rehabilitation. Job No. 1-2-4, with
Steve P. Rados, Inc., authorizing an addition of $242,360, increasing the total contract
amount to $31,911,805.
SUMMARY
• Job No. 1-2-4, Bushard Trunk Sewer Rehabilitation includes the installation of 21,600
linear feet (just over four miles) of 108-inch reinforced concrete pipe, manholes,
junction structures, and miscellaneous utility relocations.
• Boyle Engineering Corporation prepared the plans and specifications and the
contract was awarded to Steve P. Rados, Inc. on June 26, 2002.
• Change Order No. 10 includes seven items of additional work to Job No. 1-2-4.
There are no errors and omissions associated with this change order. Liquidated
damages on this contract are $2,000 per calendar day and the bonus provisions are
$750 per calendar day.
Contract Schedule
Contract Start Date September 16, 2002
Original Contract Completion Date March 18, 2004
Total Number of Change Orders to Date 10
Current Contract Completion Date March 26, 2004
Actual Completion Date N/A
Days Subject to Liquidated Damages TBD
Page 1
Change Order No. 10 Content
Item No. Description Amount Days Type
1 Curb, Gutter and Sidewalk $ 110,056 0 Design Change
Removal and Replacement
2 Miscellaneous Traffic Devices $ 32,136 0 Design Change
3 Bell Crack Mitigation and $ 48,131 0 Other
Repairs on 108-Inch
Reinforced Concrete Pipe
4 Sound Blankets - Noise $ 22,778 0 Design Change
Control
5 Security Guard Service $ 4,780 0 Design Change
6 Water Line and Valve Work at $ 20,472 0 Design Change
Hamilton/Bushard Intersection
7 Undisclosed Steel Casing $ 4,007 0 Changed
Condition
Total — Change Order No. 10 $242,360 0
Item 1 is for replacement of sidewalk, curb, and gutter mostly associated with a sewer
alignment design change. A portion of this work was requested by the City of
Huntington Beach (City). The District will be reimbursed under an agreement being
developed with the City.
Item 2 is a design change required by the City for traffic control improvements. The
contract traffic control drawings had been approved by the City prior to construction.
Once implemented, the City determined that modifications were necessary for added
safety and efficiency.
Item 3 is for additional work associated with the installation of the 108-inch concrete
pipe. Please refer to "Background for Item 3" under the ADDITIONAL INFORMATION
Section. Items 1, 2, and 3 involve a potential time extension to the contract. The
impact to the project could not be determined at this time. If justified. a contract time
extension for these items will be included in a future change order.
Item 4 is for the installation of improved sound blankets around the Contractor's
dewatering generators. This design change lowers noise levels for the continuously
operating equipment by approximately 14 decibels to accommodate residents living in
the vicinity of the construction sites.
Item 5 changes the design to include security guard services on the project construction
sites for added public safety and elimination of vandalism.
Item 6 is for the removal and replacement of a 12-inch waterline, and the addition of
a12-inch water valve, required by the City for purposes of added safety and improved
emergency response. This is a design change because the contract calls for protection
in place of this waterline with no added valves.
Page 2
4
Item 7 is for the removal of an undisclosed 15-inch steel casing. This is a changed
condition because the casing was not shown on the contract drawings.
Job Completion
The contract is now 42% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on June 26, 2002. Please refer to
the attached Change Order Status Report for information on all previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 30,003,210
Previously Authorized Changes $ 1,666,235
This Change Order (CO No. 10, Add) $ 242,360
Change Orders to Date $ 1,908,595
Percent Increase to Date 6.36%
Amended Contract Price $ 31,911,805
BUDGET IMPACT
® This item has been budgeted. (Line item: FY 04/05, Section 8, Capital
Improvement Program, Collections Facilities, Bushard Trunk Sewer
Rehabilitation, Job No. 1-2-4)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Background for Item 3:
When installation of the 108-inch reinforced concrete pipe started, 12 out of 19 pipe
joints, or 63%, failed the required pressure tests. The failures were due to cracks in the
pipe bells. Staff believes the manufacturer has designed the joints too tight causing
high stress in the bells when the pipe sections are joined. This joining stress, combined
with stresses imparted by the Contractor's construction methods, resulted in cracked
bells on some pipe sections.
The Contractor maintains that the construction methods employed meet the standards
of the industry. The Contractor's supplier maintains that the pipe joints are properly
designed. The Contractor believes that responsibility lies within the District's contract
documents or the supplier's joint design. Staff maintains that both the construction
methods and the pipe joint design are the Contractor's responsibility.
Page 3
1
Measures have been taken to reduce the joining stress such as reducing the size of
gaskets and cradling of the pipe. These measures have reduced the incidence of o
cracked pipe bells. To date, the bells are repaired with epoxy injection of the cracks
and sealant injection into the joints. Supplementary measures, described in Item 3 of
the attached Change Order, are now being employed to further reduce the joint stress
and enhance repair methods.
In order to minimize further delays to the project and impact to the public, Staff has
notified the Contractor that the District will only accept further repairs on the remaining
108-inch pipe that has been paid for as materials stored, and that the District will not
accept any more pipe with the current joint design. Additionally, the District has issued
criteria for the design and manufacture of 108-inch pipe that has not been manufactured
yet. The Contractor is working with the supplier on a new pipe design.
The Contractor claims that the past measures have caused delays and added costs and
requested that the District participate in future costs associated with the issue. The
Contractor also proposed that both parties reserve their rights to recover these costs in
the future.
Staff has agreed to participate in the measures and repairs described in Item 3 for the
remaining pipe paid for as materials stored. However, Staff has not agreed to other
requested costs such as increased production cost to lay the pipe or increased
additional cost to manufacture new pipe.
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program EIR certified on
October 27, 1999. A Notice of Determination was filed on October 29, 1999.
Additional CEQA documentation for the project was included in Addendum No. 3 to the
EIR approved on December 19, 2001. This Addendum will not change CEQA findings.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
MB:dm:ba:jo:lc
HAntglobalWgenda Draft Reports\PDCV-24 AR C0#10 110404.doc
Page 4
BUDGET INFORMATION TABLE
BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4, CO #10
"AP . ........
'1# 0�
�Wm Otnwttl gq
Pkbposwf. 14 MATEMM Dig
p
R lriltti lus. FR,' A U T H 0 ft M',* �T
S. NO
� m,
ME, �M—
W M
Nml M'dINCREASEP A' I'M
R� -1R.
lw F MNR33
• MIM
Ry=n R.fl 4 0 MR Rill
U 0II-Mmirl'ur'.
AR
HN
NO, 'I f
=W tl�'W�tlll Rh 935hM K-��4�'Ral I
H 4 HA 41iiii MR =11,
Phase 1 -Project Development S 7,800 $ 74,000 $ 74,000 'Rji. $ 74.000 $ 74,000 S 73,763 100%
Phase 2-Preliminary Design S 15,002 $ 9,200 S 9,200 1 S 9,200 S 9,200 S 9.147 99%
to
Phase 3-Design S 1,051,724 $ 2,690.400 S 2,690,400 ' S 2,690,400 S 2,690,400 S 2,550.653 95%
Phase 4-Construction S 24,180,051 $ 35,205,635 $ 242,360 S 35,447,995 S 35,205,635 $ 242,360 S 35,447,995 S 17.325,542 49%
Phase 5-Commissioning $ 50,000 S 50,000 a $ S
Phase 6-Close-Out $ 30,000 S 30.000 f S $
Phase 7-Contingency S 7,548,924 $ 1,333,765 $ (242.360) S 1,091,405 M.
if
PROJECTTOTAL S 32,803,501 $ 39,393,000 $ S 39.393,000 S 37,979,235 $ 242,360 $ 38,221.595 S 19,959,105 52%
lReimbursable Costs
IPROJECT NET S 32,803,501 $ 39,393,000 $ S 39,393,000 S 37,979,235 1 $ 242,3601 S 38,221.595 1 S 19,959,105 52%
PSA/Contract
Design PSA $ 269.900 $ 2,019,411 $ - S 2,019,411 S 2,019,411 S - S 2,019,411 S 1,845,798 91%
Construction Contract S 21,011,000 $ 31,669,445 $ 242,360 S 31,911,805 S 31,669,445 $ 242,360 S 31,911,805 S 13,520.599 42%
EDMS 003781055
CHANGE ORDER STATUS REPORT
BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4 CO #10
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM TIME TO DATE
DATE COST TO DATE INCREASE
(DAYS) (DAYS)
CONTRACT Sept. 16, 02 $30,003,210 $30,003,210 550 550
CO NO. 1* April 23, 03 $150,000 $30,153,210 0.50% 0 550
CO NO. 2 June 25, 03 $107,724 $30,260,934 0.86% 2 552
CO NO. 3 October 22,03 $44,293 $30,305,227 1.01% 1 553
CO NO. 4 February 25,04 $380,251 $30,685,478 2.27% 0 553
CO NO. 5 March 24, 2004 $409,301 $31,094,779 3.64% 0 553
CO NO. 6 May 26, 2004 $27,612 $31,122,391 3.73% 5 558
CO NO. 7 June 23, 2004 $163,618 $31,286,009 4.28% 0 558
CO NO. 8 July 21, 2004 $230,317 $31,516,326 5.04% 0 558
CO NO. 9 September 22, 2004 $153,1191 $31,669,445 5.55% 0 558
..:::'. h"! .9`33a >''• ,o:::: i .. a2e } Y, '<": Ti 2.§!e_ yr &.1e,ae laP .SS£,.;'S.:is&,. ..Y..yy�� l..y:v':!�j"!`a .�':Q.'4.... 4 6,T< ads'
'!L'-.. 8:''i n :.x,$: a 28 i A..\.&' ¢ S �in n�] }b/e{/�'►a{�r�` .5,a i �W3. •L &VY. 3 ]d Y k:.'3 a.�: ;.(.e Sa
d Riau;
LR. :1�0� t .e .d, L s a'"'.a ��i' 4 ' � ?Y;: 8 k8; '�A �i7; � PV,V:`:' 3..'<d;.'o..�" .iXSi 8.c'i'. 'R: 3 aez `Sa.s F'dV�a• 3'as k - s'h a ,.: IF ..3 tt '
,. Oil
*Approved by PDC Committee per delegated authority by Board Resolution 99-23
EDMS 003781056
t
Page 1 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Ten 10
Date: November 17, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
Amount of this Change Order(Add)(Sed,int) 242,360
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 —CURB, GUTTER AND SIDEWALK REMOVAL AND REPLACEMENT
This is an ongoing item associated with a sewer alignment design change for the removal and
replacement of sidewalk panels, curb and gutter along the proposed 108-inch Bushard Trunk Sewer
alignment between sewer stations 27+00 and 95+21. Also, adjacent to some of those replacement
locations are sidewalk panels, curb and gutter that were damaged by tree roots prior to construction.
The City requested repair of pre-existing damage for functionality and to match newly installed
sidewalk, curb and gutter. This City-requested work is not part of the Contract. OCSD agreed to fund
the work under this Contract because the Contractor is working on similar improvements in the same
area. The City and OCSD are in the process of developing a reimbursement agreement as a vehicle
for the City to compensate OCSD for the cost of this work. The sidewalk, curb and gutter damaged by
construction operations was caused by a District-required alignment design change for the installation
of 21-inch and 27-inch sewers between sewer stations 42+00 and 95+21. Repair work is continuing,
and the Contractor is compensated periodically. This item pays for improvement work between July 2,
2004 and August 9, 2004. The work consisted of concrete breaking for removal, disposal of concrete,
subgrade grading and compaction, and concrete replacement. The Contractor has reserved its right
to submit a time impact analysis for this item at a later time to support the extension of the completion
date of the contract. This work was accomplished by Contractor's force account pursuant to Section
46 of the General Requirements. (Reference FCO 124-14, FCO 124-54, CO No. 5-Item 1, CO No. 7-
Item 3, CO No. 8-Item 5, CO No.9-Item 5)
ADDED COST THIS CHANGE ORDER ITEM: $ 110,056.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 2 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Ten 10
Date: November 17, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
ITEM 2- MISCELLANEOUS TRAFFIC DEVICES
This item is for labor, material, and equipment required for revisions to the contract traffic control
plans between July 14, 2004 and August 13, 2004, as required by the City of Huntington Beach. The
contract documents contain traffic control drawings for all phases of main line sewer installation along
the four-mile sewer alignment. When the traffic control was implemented, the City of Huntington
Beach required modifications to the traffic control devices around the construction sites. The contract
traffic control drawings had been reviewed and approved by the City of Huntington Beach prior to
construction. The modifications include additional traffic signs, crash cushions, striping, and
installation of temporary traffic lights with associated electrical conduits and wiring. The traffic control
modifications will continue throughout the construction phase. This item pays for the extra cost
incurred by the Contractor. The Contractor has reserved its right to submit a time impact analysis for
this item at a later time to support the extension of the completion date of the contract. This work was
accomplished by Contractor's force account pursuant to Section 46 of the General Requirements.
(Reference FCO 124-55, CO No. 8-Item 6, CO No.9-Item 6)
ADDED COST THIS CHANGE ORDER ITEM: $32,136.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 3 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Ten 10
Date: November 17, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
ITEM 3— BELL CRACK MITIGATION AND REPAIRS ON 108-INCH REINFORCED CONCRETE
PIPE
This item funds extra cost incurred by the Contractor associated with Item 8 of previous Change
Order No. 8, which was approved by the Board on July 21, 2004, and Item 7 of previous Change
Order No. 9, which was approved by the Board on September 22, 2004. These items explained that
further additional costs will be included in future change orders. For reference, included below is the
text for Item 7 of Change Order No. 9, updated to reflect current pipe installation quantities and the
specific additional items of work funded by the District:
To date, the District has paid for 7,041 linear feet of 108-inch reinforced concrete pipe as materials
stored on site. Subsequent to the payment, the pipe revealed problems with tight joints and cracking.
Contractor purports that the problems have caused significant project delays and extra costs for pipe
installed prior to March 5, 2004. At this time there are 1,242 feet of uninstalled pipe remaining that
the District has paid for as materials stored on site. At the Contractor's request and in the spirit of
cooperation to further the parties' collective interest to complete this project as effectively and quickly
as possible, the District issued instructions to the Contractor for installation of the remaining paid for
108-inch pipe. The instructions contain additional items of work that are intended to mitigate the pipe
problems. Staff has also agreed to initially fund the costs for some of these items as listed below in
order to share the short term financial burden associated with the installation of this pipe.
This item funds the costs as listed below for the installation of the remaining paid for 108-inch
reinforced concrete pipe:
1a) Epoxy repairs to pipe that contains cracks subsequent to delivery on site;
1 b) Special joint testing for joints with one gasket instead of two;
1c) Cement repairs to longitudinal pipe cracks;
1d) Supply and installation of any WEKO-SEALS;
le) Preparation of installed pipe for special inspections by the District.
The item pays for work under Items 1a), 1c) and 1e), cement repairs to longitudinal pipe cracks, and
preparation of installed pipe for special inspection, on Bushard between Banning and Hamilton. The
Contractor will continue to incur costs for these items until the main pipe work has passed the
Hamilton intersection at sewer station 80+62.
The approval of this item is not an admission of any responsibility by the District for these additional
costs nor a waiver of any of the District's rights and remedies. The District reserves its rights to
recover any funded costs associated with this item. The Contractor has reserved its right to submit a
time impact analysis for this item at a later time to support the extension of the completion date of the
contract. (Reference FCO 124-60, CO No. 8-Item 8, CO No.9-Item 7)
ADDED COST THIS CHANGE ORDER ITEM: $48,131.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 4 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Ten 10
Date: November 17, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
ITEM 4— SOUND BLANKETS —NOISE CONTROL
This item funds extra cost incurred by the Contractor associated with Item 10 of previous Change
Order No. 9,which was approved by the Board on September 22, 2004. This item is for the
installation of improved sound blankets by a specialty contractor around three continually operating
electrical generators used for dewatering. The generators are located on Bushard Street at the
Hamilton Avenue and Yorktown Avenue intersections. The sound blankets are required as part of the
District's efforts to minimize construction impacts to the residents living in the vicinity of the work.
Even though the Contractor is using extra quiet generators which comply with contract requirements,
the residents in the area requested increased levels of sound protection. The extra work consisted of
the purchase and installation of professionally designed sound blanket walls around the generators.
The Contractor will continue to incur costs under this item for future relocations of and modifications to
the enclosures. This work was accomplished by Contractor's force account pursuant to Section 46 of
the General Requirements. (Reference FCO 124-63, CO No. 9-Item 10)
ADDED COST THIS CHANGE ORDER ITEM: $22,778.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 5— SECURITY GUARD SERVICE
This item pays for part of the extra costs for security guard services on the project construction sites,
starting at the Banning/Bushard intersection, for the months of June, July, and August 2004. The
contract requires solid fencing around construction zones to keep the public out of these areas. The
Contractor installed the fencing, but the public, especially minors, frequently ignore this barrier and
enter the construction site after hours. Individuals have been found inside the 108-inch trench and
pipe, and some of the Contractor's equipment has been vandalized. The District and the Contractor
decided to hire security guard services, which residents in the vicinity had also requested for added
public safety. A cost-sharing agreement was set up since the security services are mutually
beneficial, with the District responsible for 40% of the cost. Security guard services are provided on
weekdays after Contractor's regular working hours, and continually on weekends. The services will
continue and the Contractor is compensated periodically. This work was accomplished by
Contractor's force account pursuant to Section 46 of the General Requirements. (Reference FCO
124-64)
ADDED COST THIS CHANGE ORDER ITEM: $ 4,780.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
t
Page 5 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Ten 10
Date: November 17, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
ITEM 6—WATER LINE AND VALVE WORK AT HAMILTON/BUSHARD INTERSECTION
This item is for labor, material, and equipment required for the removal and relocation of portions of
an existing 12-inch waterline in the Hamilton/Bushard intersection at approximate sewer station
67+85, and for the installation of one isolation water valve in the same location. The Contractor had
to cross the existing waterline with the proposed 108-inch Bushard Trunk Sewer. The contract
requires protection in place of the waterline during installation of the proposed sewer. For purposes
of added safety and to assist in the isolation and protection of the water distribution system during the
construction work, the City of Huntington Beach required removal and replacement of interfering
portions of this line, and installation of one isolation valve. The extra work consisted of traffic control,
excavating and shoring, installation of one 12-inch water valve, removal and replacement of 60-feet of
12-inch water line, line disinfection, backfill, and pavement replacement. This work was accomplished
by Contractor's force account pursuant to Section 46 of the General Requirements. (Reference FCO
124-66)
ADDED COST THIS CHANGE ORDER ITEM: $20,472.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 7— UNDISCLOSED STEEL CASING
This item is for labor, material, and equipment required to remove an undisclosed steel casing around
an existing City sewer in the Yorktown/Bushard intersection at approximate sewer station 173+70.
The Contract requires the Contractor to remove and replace the existing 15-inch City sewer at the
intersection. The undisclosed casing had to be removed because it interfered with the replacement of
the sewer. The extra work consisted of trench excavation, and removal and disposal of steel casing.
This work was accomplished by Contractor's force account pursuant to Section 46 of the General
Requirements. (Reference FCO 124-67)
ADDED COST THIS CHANGE ORDER ITEM: $4,007.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL ADDED COSTS THIS CHANGE ORDER: $242,360.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 6 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Ten 10
Date: November 17, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
The compensation set forth in this change order comprises the total compensation due the Contractor,all
subcontractors and all suppliers, for the work or change defined in this change order only. By signing this
change order, the Contractor acknowledges and agrees, on behalf of himself, all subcontractors and all
suppliers,that the stipulated compensation includes payment for all work contained in this change order,
plus all payment for the interruption of schedules, extended overhead costs,delay,and all impact, ripple
effect or cumulative impact on all other work under this Contract except for work related to Items 1,2 and
3 of this change order. This change order does not address or resolve any claims and/or issues for
compensation for time extensions under the Contract and/or related damages by the District, the
Contractor, all subcontractors and all suppliers for Items 1, 2 and 3. The District, the Contractor, all
subcontractors and all suppliers reserve their rights regarding claims and/or issues related to time impacts
or extensions under the Contract and/or damages for delay for Items 1, 2 and 3. The execution of this
change order should not be deemed to be a waiver by any party regarding time extensions under the
Contract and/or damages or impacts for Items 1, 2 and 3. Additionally, the District reserves its rights to
recover costs funded under Item 3.
SUMMARY OF CONTRACT TIME
Original Contract Date: September 16, 2002
Original Contract Time: 550 Calendar Days
Original Completion Date: March 18, 2004
Time Extension this C.O.: 0 Calendar Day
Total Contract Time Extension: 8 Calendar Days
Revised Contract Time: 558 Calendar Days
Revised Final Completion Due Date: March 26, 2004
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: N/A
Original Contract Price $ 30,003,210.00
Prev. Authorized Changes $ 1,666,235.00
This Change (Add) (9edUst) $ 242,360.00
Amended Contract Price $ 31,911,805.00
Page 7 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Ten 10
Date: November 17, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
Board Authorization Date: November 17, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
John D. Linder, P.E. Date
Construction Manager
Approved by:
David A. Ludwin, P.E. Date
Director of Engineering
Accepted by:
Steve P. Rados, Inc.
Contractor Date
EDMS 003781058
PDC COMMITTEE Meeting Date To Bd.of Dir.
11/04/04 11/17/04
AGENDA REPORT Item Number Item Number
PDC04-92 13(e)
Orange County Sanitation District
FROM: David A. Ludwin, Director of Engineering
Originator: Alberto Acevedo, Project Manager
SUBJECT: COAST TRUNK SEWER REHABILITATION, CONTRACT NO. 11-26
GENERAL MANAGER'S RECOMMENDATION
Approve Professional Services Agreement with Malcolm Pirnie. Inc. for preparation of a
Preliminary Design Report for the Coast Trunk Sewer Rehabilitation, Contract
No. 11-26, for an amount not to exceed $2,219,330.
SUMMARY
• Built in the early 1980s, the Coast Trunk sewer has suffered structural damage due
to hydrogen sulfide corrosion. This project will evaluate the extent of the damage
and will provide recommendations for the rehabilitation of the pipeline.
• The Professional Services Agreement (PSA) includes the following:
1. Preparation of Preliminary Design Report (PDR) to include a series of technical
memoranda to document the condition of the pipeline and present a conceptual
design of the proposed rehabilitation methods. The PDR will include preparation
of an Odor Assessment and Odor Control Plan, assessment of the amount of
solids deposited in the pipeline, Preliminary Physical Inspection, CCTV
Inspection Report, and a Final Physical Inspection to assess structural
conditions, lining integrity, and rehabilitation options.
2. California Environmental Quality Act (CEQA) and permit support services.
3. General Project Management Activities.
• Due to the uncertainty of the amount of solids to be removed from the pipeline and
the structural conditions of the trunk sewer, staff decided to take a stepped approach
to obtain the necessary information before awarding the final removal of the solids
deposited in the pipeline, and the final design for the rehabilitation project. This
approach will permit the completion of the Preliminary Design Phase where the
consultant will perform a physical inspection and assessment of the solids deposited
in the pipeline and the assessment of the structural conditions of the entire trunk
sewer.
Revised 06/04/03 Page 1
• The District solicited proposals from five consulting firms including: Dudek &
Associates, Inc.; Earth Tech, Inc.; Malcolm Pirnie, Inc.; Tran Consulting Engineers;
and Villalobos & Associates. A pre-proposal meeting was held on August 4. 2004 to
present the project objectives and to answer questions or concerns from potential
proposers. One of the invited firms entered into a teaming agreement with another
invited firm, resulting in a total of four proposals received.
• The Evaluation Team evaluated the four proposals and recommends award of the
PSA to Malcolm Pirnie. Inc. for an amount not to exceed $2,219,330.
PRIOR COMMITTEE/BOARD ACTIONS
Please see attached PSA Status Report.
PROJECT/CONTRACT COST SUMMARY
A total authorization of $2,219,330 is within the project's total budget. The total project
budget of S16,635.000 will not change. This project will complete work within Phase 2-
Peliminary Design Phase. Therefore, in order to have a sufficient budget for the
completion of the project, it was necessary to transfer $500,000 from Phase 3-Design
and S1,649,000 from Phase 4-Construction into Phase 2-Preliminary Design
($2,149,000) to accurately account for costs. Please see attached Budget Information
Table.
BUDGET IMPACT
0 This item has been budgeted. (Line item: Section 8, Page 47)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Constructed in the early 1980s, the Coast Trunk Sewer consists of three reaches, and is
located in the City of Huntington Beach. The first two reaches were built under Contract
No. 11-13-2 (approximately 1980), and the third reach under Contract No. 11-13-3
(approximately 1982). The Coast Trunk Sewer was designed and built mainly to
provide service to an area that was planned to be developed at the time. Some
demographic projections from the 1970s indicated that approximately 10,000 additional
dwelling units would be built in the Bolsa Chica area. Due to environmental constraints,
the development never materialized.
When the sewer was designed, it was assumed that the water in the pipe would have a
considerable depth under the projected flows. Therefore, the PVC lining specified by
the designers covered only 240 degrees of the top inside surface of the pipe. Because
the anticipated flows were not achieved, the water in the pipe is constantly shallower
than planned: leaving exposed a portion of the bare concrete pipe under the edge of the
PVC lining.
Revised 06/04/03 Page 2
c
This concrete surface between the water surface and the edge of the liner is constantly
exposed to corrosion by sulfuric acid condensed on the inside top surface of the pipe
(pipe soffit) that drips on the pipe walls.
Portions of the Coast Trunk Sewer were videotaped (CCTV) in 1999. District staff
located tapes that cover approximately 7,200 Linear Feet (LF) of the total project length
of close to 24,000 LF. The tapes cover several sections of pipe that vary in length from
730 to 2,955 LF. The available videotapes show that the corrosion is extensive and
appears to be located specifically under the PVC lining. The imaging presented could
not focus properly to assess the presence of exposed rebar. Also, the existing
videotapes do not provide the information necessary to determine the type and amount
of rehabilitation work required to correct the problem.
The videotapes also show that the PVC liner has separated at many pipe joints. Some
joints also appear to be open between 1 and 1.5 inches. The sewer gases and the
sulfuric acid formed in the pipe have potentially entered the open joints and may have
corroded the ends of the pipe. The tapes cannot provide sufficient information on the
actual joint condition.
A significant amount of sand and debris has accumulated over the years because of the
low flow velocities in the sewer. Another factor that contributed to the solids buildup
was a storm drain that was mistakenly connected for many years to the Coast Trunk
Sewer. The storm drain has been disconnected from the District sewer and connected
to the storm drain system.
This project will provide for the cleaning and physical inspection of the entire Trunk
Sewer. The Consultant will prepare a final document to report the final assessment of
the pipeline. This report will provide the assessment of the structural conditions of the
pipeline, lining integrity, and rehabilitation options if necessary.
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
This project was included in the District's 1999 Strategic Plan Program Environmental
Impact Report that was certified on October, 1999.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Proposal Evaluation Report, September 11, 2004
H:lntglobaRAgenda Draft ReportsTDC111-26 PSA Agenda Report.doc
Revised 06/04/03 Page 3
BUDGET INFORMATION TABLE
COAST TRUNK SEWER REHABILITATION
CONTRACT NO. 11-26
WN
fl
A K pl ,.,M. i i H m
NN�Pn:
0.
z 1 1,1 r,m!
Phase 1-Project Development $ 56,000 $ 66,000 $ - S 66,000 $ 66,000 $ - S 66.000 $ 91,133 138%
Phase 2-Preliminary Design S 266,000 S 256,000 $ 2,149,000 $ 2,405,000 $ 184,000 $ 2,219.330 S 2,403,330 $ 15,119 1%
Phase 3-Design $ 1,559.000 S 1.560,000 $ (500,0001 $ 1,060,000 $ $ - S #DIV/O!
Phase 4-Construction $ 12,357,000 S 12,358,000 $ (1,649,000) $ 10,709,000 $ $ - S S 131 #DIV/O!
Phase 5-Commissioning $ 131,000 S 130,000 S 130.000 d $ - S $ #DIV/O!
Phase 6-Close-Out $ 39,000 S 38.000 S 38,000 $ $ S $ #DIVIG!
Phase 7-Contingency $ 2,227,00D S 2,227,000 2,227,000 $ $ #DIV/O!
PROJECT TOTAL 16,635,000 $ 16,635.000 S $ 16,635,000 $ 250,000 $ 2.219.330 $ 2,469.330 1$ 106.3831 4%
lReimbursable Costs
PROJECT NET 1$ 16.635,000 $ 16,635.000 $ 1$ 16,635.000 I$ 250,0001$ 2.219.3301$ 2.469,330 1$ 106,3831 4%
PSA/Contract
Design PSA S - $ 2,219,330 $ 2,219,330 $ 2,219.330 $ 2.219,3301
Construction Contract $ 11,133,000 S 11,133,000 $ (1,000,000) $ 10,133,000 $ $ -
EDMS.003780192 04-92.1.xis 10/27/2004
Professional Services Agreement Status Report
COAST TRUNK SEWER REHABILITATION
CONTRACT NO. 11-26
Total Project Budget: $16,635,000
Consultant: MALCOLM PIRNIE
Date Amendment Description Cost Accumulated
Costs
Pending Original PSA Coast Trunk Sewer Rehabilitation — Preliminary
Desi n Re ort $ 2,219,330 $ 2,219,330
11-26 PSA Status Report.doc 10/27/04
EDMS: 003780193
Q
COAST TRUNK SEWER REHABILITATION
CONTRACT NO. 11 -26
September 11, 2004
Proposal Evaluation Report
Request for Proposals (RFPs)were sent on July 29, 2004 to the following consulting
firms:
• Dudek&Associates, Inc.
• Earth Tech, Inc.
• Malcom Pirnie
• Tran Consulting Engineers, and
• Villalobos &Associates
The five firms had representatives attend the mandatory pre-proposal meeting
scheduled on August 4, 2004. Villalobos&Associates enter into a teaming agreement
with Malcom Pirnie,therefore four firms submitted a proposal on the due date (August
23, 2004). An Evaluation Team was selected to review and evaluate proposals the
same week. Each member of the in-house review panel individually reviewed and
ranked the proposals. The review panel consisted of four District members. Each
proposal was graded from 1 to 10 (10 being best) in six weighted categories as
described below:
1. Project Approach and Understanding of the Scope of Work(Weight 10)—
Rates the team's understanding of the Scope of Work included in the RFP and
their approach to the work, methodology, and task breakdown.
2. Plan for Managing and Performing the Work(Weight 8) -Rate the team's
project management techniques and methods and procedures for performing the
tasks.
3. Applicable Staff Qualifications (Weight 10)—A comparison of the team's
educational background and professional qualifications as they relate to the
Scope of Work for this project.
4. Applicable Related Project Experience (Weight 8)—Rates the team's overall
total number of years experience and roles performing engineering services as it
relates directly to the design and construction of this project. This also rates the
team's recent experience on applicable projects as it relates directly to the design
and construction support for this project.
5. Team Organization and Use of Subconsultants (Weight 5)—Addresses the
appropriateness of assignments to consultant staff and/or subconsultants to
consultant teams.
6. Proposed Schedule(Weight 5)—Rates the consultant's proposed schedule as
to whether it meets the District's needs and whether the consultant can meet the
schedule. This also rates whether the consultant provided an accelerated
schedule and could the consultant meet it.
EDMS:003781728 1 of4 10/27/2004
9
The initial written proposal rankings were compiled on August 30, 2004. A meeting was
then held on September 1, 2004 to discuss the proposals and the reasons and
background for individual rankings. Based on these discussions, the Evaluation Team
agreed to finalize their rankings and submit the final evaluation forms the next day.
These were compiled on September 2, 2004 and presented to the Evaluation Team.
Table 1 presents the results of the Team evaluation of the proposals submitted. The top
two ranked firms were ranked as follows:
1. Malcom Pirnie 1674 Points
2. Earth Tech 1509 Points
The following is a summary of how the evaluation team collectively viewed Malcom
Pirnie the top ranked consultant:
Malcom Pirnie was ranked number 1 by three of the four review team members.
Malcom Pirnie proposal presented several issues in the project approach including a
discussion on the potential opportunity to utilize a systematic approach to complete the
pipeline assessment work, the proposal included a graphical display of their project
approach and execution plan were Malcom Pirnie explained in detail the need to
complete the odor assessment and control task at the initiation of the project and in
parallel with a preliminary physical inspection to assess rapidly the conditions of the
pipeline. The Quality Control and Quality Assurance (QA/QC) plan, as well as their
project management procedures were excellent. The proposed Project Manager
qualifications are excellent. The proposed project support staff has the best similar and
most recent project experience. The proposed project team, including sub-consultants,
is well organized based on specialties and division of the work. In addition to these
items, the following attributes formed the basis for Malcom Pirnie high ranking:
1. Excellent approach to assess the solids deposited in the pipeline
2. Excellent approach for the removal and disposal of the solids deposited in
the pipeline
3. Good discussion regarding sewage flow assessment
4. Excellent managing approach
5. Most relevant Team experience
6. Excellent discussion on modeling of solids deposited, and
7. Good discussion on foul air movement and velocity modeling
Fee Proposals
After the final ranking of the technical proposals, the sealed fee proposals submitted by
all the firms were opened on September 7, 2004. The Fee for Consultant Services
received from the consultants arranged in the order from highest to lowest technical
ranking were:
Total Fee for PDR Services
Malcom Pirnie $ 2,556,662
Earth Tech, Inc. $ 1,688,194
Tran Consulting Engineers $ 1,116,397
Dudek &Associates, Inc. $ 3,173,788
EDMS:003781728 2 of 4 10/27/2004
In order to try to bring some rationale to the submitted costs, a detailed review and
analysis of the level of effort and fee proposals was requested by the Director of
Engineering. The analysis of the level of effort for each proposal gave us an
understanding that the proposed level of effort by Malcom Pirnie was of the same order
of magnitude as the other top two consultants. It was further determined that the
consultant with the lowest fee proposal TRAN Consulting Engineers had underestimated
or did not fully understood the scope of work as detailed in the Request for Proposal
(RFP) document. It was also found during negotiations meetings with Malcom Pirnie,
the highest ranked consultant, that their original fee proposal did not included a fee for
sewage by-pass operations and that approximately one third of the cost was associated
with the cleaning task and the removal and disposal of the 1,000 cubic yards of solids
deposited in the pipeline as quoted in the RFP.
At the conclusion of the negotiations meetings with Malcom Pirnie to confirm that the
Consultant included all tasks required by the SOW and that each task had the correct
associated fee, the final fee was estimated at $ 3,072,876. Table 2 summarizes the final
level of effort and fee data from the consultants, including the final fee from Malcom
Pirnie with and without the Specialty Subconsultants fee for the removal of the solids
deposited in the pipeline.
From this evaluation, the PMO Management team made the following decisions:
1. The PSA will include within the ODC's a reimbursable item for the supply of field
and safety equipment to perform the Confined Space Entry Activities. This
activity includes: trailer mounted ventilation equipment, oxygen trailer,
communications equipment, utility trucks, traffic control devices, and Confined
Space entry and rescue personnel. The extent of this activity was estimated at
30 days at a cost of$ 7,000 per day, based on the list of items to be provided by
the Subconsultant Jamison Engineering Contractors, Inc. (JEC), for a total
estimated amount of$ 210,000. Actual payment shall be calculated daily
according to the items provided on each day.
2. The PSA will include within the ODC's a reimbursable item for the by-pass of
sewage if the physical inspection activities can not be accomplished during the
low flow periods. The duration of the by-pass activities was estimated at 170
days, at a cost of$ 3,565 per day, based on the items listed on Attachment"B"of
Malcom Pirnie fee proposal, for a total estimated amount of$ 606,050.
3. The PSA will not include the services of a Specialty Subconsultant for the
removal and disposal of solids deposited and the cleaning of the pipeline. After
the completion of the preliminary physical assessment and the assessment of the
amount of solids in the pipeline in accordance with the SOW, the Consultant shall
assist the district in the preparation of Bid Documents for the removal of the
solids and the cleaning of the pipeline.
Items 1 and 2 will only proceed if authorized by the Project Manager. The amounts are
not to be exceeded and will be utilized on an as needed basis only. The District
reserves the right to modify or cancel these services at any time.
Based on the information provided above plus the highest technical ranking, Staff
recommends that Malcom Pirnie be awarded the Professional Services Agreement
EDMS:003781728 3 of 4 10/27/2004
(PSA) for the Coast Trunk Sewer Rehabilitation, Contract No. 11-26, for a total fee not to
exceed $ 2,219,330.
TABLE 1
COAST TRUNK SEWER REHABILITATION
CONTRACT 11 —26
FIRM Dudek& Earth Malcom Tran Consulting
Assoc. Tech Pimie En rs.
Reviewer 1 335 355 414 304
Reviewer 2 225 319 399 358
Reviewer 3 337 393 434 363
Reviewer 4 270 442 427 354
TOTAL SCORE 1167 1509 1674 1379
AVERAGE SCORE 292 377 419 345
TECHNICAL RANKING 4 2 1 1 3
TABLE 2
COAST TRUNK SEWER REHABILITATION
CONTRACT 11 —26
Firm Dudek& Earth Tech Malcom Pirnie Tran Consulting
Assoc. Engrs
Total Hours 4,833 3,638 4,168 1,714
Total Labor Fee $ 510,858 $ 457,490 $ 554,329 $ 161,947
Labor Cost per hr, $/hr 105.70 125.75 133.00 94.48
Confined Space Entry Fee $ 264,000 $ 189,000 $ 210,000 -
Specialty Subconsultant
for Solids Removal/Pipeline
Cleaning Fee $ 1,857,043 $ 750,000 $ 853,546 $ 385,000
Sewage By-Pass Fee (1) 2 $ 606,050 $45,000
Subconsultants Fee $ 523,386 $ 255,052 $ 757,155 $ 524,450
ODC's $ 18,500 $ 36,652 $ 91,800 -
Total Fee, w/Specialty
Subconsultant $ 3,173,788 $ 1,688,194 $ 3,072,876 $ 1,116,397
Total Fee, w/out Specialty
Subconsultant $ 2,219,330
(1) This cost is included in the solids removal fee
(2) Not presented as a separate cost
EDMS:003781728 4 of 4 10/27/2004
PDC COMMITTEE Meeting Date To Bd. of Dir.
11/4/04 11/17/04
AGENDA REPORT Item Number Item Number
PDC04-93 13(f)
Orange County Sanitation District
FROM: David Ludwin. Director of Engineering
Originator: Bob Schirripa, Project Manager
SUBJECT: REHABILITATION OF ODOR CONTROL FACILITIES, JOB NO. J-71-8
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 2 to the Professional Services Agreement with Camp,
Dresser, & McKee for Rehabilitation of Odor Control Facilities, Job No. J-71-8, providing
for modifications to the scope of work for an additional amount of $645,674, increasing
the total amount not to exceed S4,220,881.
SUMMARY
• In October 2003, the Orange County Sanitation District (District) issued a
Professional Services Agreement (PSA) to Camp, Dresser, & McKee (CDM) to
provide engineering services for the Rehabilitation of Odor Control Facilities, Job
No. J-71-8. This project upgrades the odor control facilities at the Metering &
Diversion structure.. Headworks, and Primary Clarifiers in Plant No. 1. These
upgrades include the replacement of the current single stage chemical scrubbers
with a new two stage scrubbing system consisting of a biotower followed by a
chemical scrubber, along with the associated supporting facilities such as
ductwork, supply fans, and chemical supply systems.
• Amendment No. 2 adds the following work items to the currently approved PSA:
Expands Power Building 3A to the south to house the electrical and instrument
equipment required for Rehabilitation of Odor Control Facilities, Job No. J-71-8
as well as additional electrical items added as a result of the recommendations of
Job No. J-25-4. Electrical System Power Studies.
Provides the engineering to relocate existing electrical and instrument equipment
from the existing Building 3A to the new expansion.
Performs air modeling of Plant Nos.1 and 2 based on odor units instead of H2S
equivalents.
Performs a feasibility study to determine the proper foul air treatment system
required to maintain the zero odor complaint policy now that the District is
measuring odor control units rather than 1-12S.
Provides Value Engineering Review Services.
H WeptlagendaMoard Agenda Reports12004 Board Agenda Reports11104111em 13(1)Camp Dresser McKee doc
Revised 06/04/03 Page 1
Provides the evaluation of design alternatives via a triple bottom line (TBL)
model.
PRIOR COMMITTEE/BOARD ACTIONS
Please refer to the attached PSA Status Report.
PROJECT/CONTRACT COST SUMMARY
The attached Amendment No. 2 letter from CDM dated October 25, 2004 summarizes
the scope and costs associated with the proposed Amendment No. 2. Authorization is
requested to increase the value of the PSA by $645,674 which will result in a total PSA
not to exceed $4,220,881. Also requested is the approval to reallocate $645,674 from
Contingency to Phase 3 Design, to fully cover the proposed Amendment No. 2 as
indicated in the attached Budget Information Table.
BUDGETIMPACT
® This itern has been budgeted. (Line item: Section 8 — Page 101)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The work identified in proposed Amendment No 2 has been determined by Staff as
necessary for the successful completion and implementation of Rehabilitation of Odor
Control Facilities, Job No. J-71-8. As listed. the work identified in the proposed
Amendment No. 2 was the result of design requirements and field investigations by the
Consultant during the preparation of the Preliminary Design Report.
Power Building 3A Expansion: During the Preliminary design, it became clear that the
electrical and instrumentation equipment required to implement Rehabilitation of Odor
Control Facilities. Job No. J-71-8, as well as the incorporation of the Electrical System
Power Studies. Job No. J-25-4, recommended upgrades would not fit into the existing
Power Building 3A. After discussions with the consultant, it was determined that a side
study would need to be performed to determine the best approach to expanding
Building 3A. Preliminary discussions determined that the best approach would be to
expand the building to the south. However. this approach needs to be firmed up as well
as completing the design of the expansion. This is anticipated to be done during the
development of Design Submittal 2.
Air Modeling: During the past several months. the Air Quality division has determined
that there are residual odors emitting from both the treatment plants. These odors
appear to be coming from compounds other than hydrogen sulfide (1-12S). This prevents
the District from complying with the policy of zero odor complaints during normal
operations. Based on this assessment, the Air Quality division determined that
modeling the plants using HZS equivalents does not adequately characterize the odors.
H ldeptlagendalBoard Agenda Reports12004 Board Agenda Reports11104111em 13(f)Camp Dresser McKee.doc
Revised 06/04/03 Page 2
As such, the Air Quality division felt that it would be best to remodel both plants using
odor units as a parameter.
r"
Once the plants are modeled using odor units, the consultant can determine which
combination of treatment systems would be required to bring the odors down to an
acceptable level. The consultant would then perform feasibility studies for each of the
options in order to determine the rough order of magnitude cost (capital and operating).
This information would then be used in the Triple Bottom Line (TBL) model to rank the
alternatives based on economic, societal, and environmental impacts as stated in the
District's Unifying Strategies.
Value Engineering: This is a review of the design by an independent group of
individuals to uncover areas in the design that could be improved, modified, or deleted
in order to lower the life cycle cost while providing "value". It is important that the VE be
performed by individuals who were not involved in the original design. This provides a
fresh set of eyes and minds which normally results in uncovering design alternatives
that reduce the life cycle cost. As an example, is it more cost effective to treat the odors
using a biotower followed by a chemical scrubber or should the second stage be
activated carbon. The VE team will present its results in the form of a life cycle cost
analysis that shows which second stage treatment has the lowest life cycle cost and
should be used. In a similar fashion, the VE team would move through the rest of the
design.
For this project, the VE will be performed by a team of CDM personnel who have had no
involvement in the design. The original scope of work stated that the VE consultant
would be obtained by the District but it was considered more cost effective and less
disruptive to perform the VE in the manner proposed in this Amendment.
Triple Bottom Line: The Unifying Strategies requires the District make their capital
investment decisions based on a triple bottom line (TBL) that consists of economic,
societal, and environmental impacts. Because Rehabilitation of Odor Control Facilities.
Job No. J-71-8 is an odor control project, it was determined that it was best suited to
serve as a pilot project for the evaluation and implementation of a computer model to
rank a number of alternatives based on a TBL.
To this end, GHD, a consultant specializing in this type of work, has developed a model
that evaluates different alternatives based on a TBL. This model needs to be
customized to meet the District's decision criteria. Once this is done, the TBL model
would be used to rank the air modeling alternatives discussed above. The result would
then be reviewed with District management to reach a consensus on which alternative
to develop into a detailed design.
ALTERNATIVES
Not issue Amendment No. 2. If Amendment No. 2 is not issued, this additional work will
not be funded and the chances for the success of the project will significantly decrease
as Staff believes that this work needs to be performed in order to provide the required
Wdeptl,agendalBoard Agenda Reports@004 Board Agenda Reports\11041dem 13(f).Camp Dresser McKee doc
Revised. 06104/03 Page 3
electrical equipment and associated items for the safe and reliable operation of the odor
control facilities.
CEQA FINDINGS
This project was included in the District's Strategic Plan Program EIR. The EIR was
certified on October 27, 1999 and a Notice of Determination was filed on October 29,
1999. In addition, a Notice of Exemption was filed with Orange County on February 24,
2004.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Letter from CDM dated October 25, 2004
RS:ba:eh
Wdepl%agendalBoard Agenda Reporls12004 Board Agenda Reports111 o4Ulem 13(f).Camp Dresser McKee.doc
Revised 0&04103 Page 4
BUDGET INFORMATION TABLE
REHABILITATION OF ODOR CONTROL FACILITIES
JOB NO. J-71-8
mq,;4 43 rr'W-10S.
........... �4 'IM T
-Mig
12 MW
v
a. g1w
pkIwa-i", NbW 01, p.
.in Exi PRO
pf
bid,
P'T i
1801
13
g�Kg'
ON C I
IBM-
A I'M
x lo W, Re
M
egg, ..pigu,
W,V 010MVt .
RRM". aw
Phase Project
Development $ 100,000 $ 56,000 $ 56.000 $ 56.000 $ 56,000 $ 46,180 82%
Phase Preliminary
Design $ 632,000 $ 1,356,000 $ 1,356,000 $ 1,356,000 $ 1,356,000 $ 1.340,430 99%
Phase Design $ 3,364,000 $ 4,117,685 $ 645,674 $ 4,763,359 $ 4,117.685 $ 645,674 $ 4,763,359 $ 237,080 5%
Construction $ 24,396,000 $ 23,396,000 $ 23,396,000 $ 2,103,123 $
$ 2,103,123 $ 164,578 8%
Commissioning $ 421,000 $ 346,000 $ 346,000 $ 210.312 $ 210,312 $ (21,516) -10%
Close-Out S 105,000 S 79,000 S 79.000 $ 52,578 $ 52,578 $ 0%
Contingency $ 4,206,000 $ 4,251,000 $ (645,674) S 3,605,326 $ 0%
PROJECT TOTAL $ 33.224,000 $ 33,601,685 $ $ 33,601,585 $ 7,895,698 $ 645,674 $ 8,541,372 $ 1,766,752 21%
lReimbursable Costs I
1PROJECT NET 1 $ 33,224,000 $ 33,601,685 $ $ 33,601,685 $ 7,895,698 1 $ 645,6741$ 8,541,372 1 $ 1,766,752 1 21%
PSA/Contract
Design PSA $ 2,103,123 S 3,575,207 $ 645,674 $ 4,220,881 $ 3,575,207 $ 645,674 $ 4,220,881 $ 1,228,992 33%
Construction Contract $ 21,031,232 $ - $ $ - $
EDMS:003781089
Professional Services Agreement Status Report
REHABILITATION OF ODOR CONTROL FACILITIES
JOB NO. J-71-8
Total Project Budget: $33,224,000
Consultant: Camp, Dresser, & McKee (CDM)
Date Amendment Description Cost Accumulated
Costs
10/22/03 Original Design engineering services for modifications of odor
control facilities at Metering & Diversion, Headworks, and $3,197,522 $3,197,522
Primary Facilities in Plant No. 1.
9/22/04 Amendment 1 Additional design services required for the expansion of
Power Building#4 and associated electrical equipment as $377,685 $3,575,207
well as the implementation of electrical design changes as
a result of project J-25-4.
Additional design services required for the expansion of
Pending Amendment 2 Power Building 3A including the cost for relocating existing $645,674 $4,220,881
equipment to the new expansion. Also, additional design
services for the modeling of Plant#1 & 2 based on odor
units instead of H2S equivalents along with the feasibility
studies to determine the proper treatment processes.
RS:bja:eh
EDMS: 003781087 10/27/04
PDC COMMITTEE Meeting Date To Bd.of Dir.
11/04/04 11/17/04
AGENDA REPORT Item Number Item Number
PDC04-94 13(g)
Orange County Sanitation District
FROM: David Ludwin. Director of Engineering
Originator: Larry Rein, Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 7 to the Professional Services Agreement with Boyle
Engineering Corporation for Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4,
providing for additional engineering construction support services for an
additional amount of $326,509, increasing the total amount not to exceed
$2,345,920.
SUMMARY
• The project is located within the Cities of Huntington Beach and Fountain
Valley. The trunk sewer is in Bushard Avenue between Ellis Avenue and
Banning Road, Banning Road between Bushard Avenue and Brookhurst, and
Brookhurst between Banning Road and Plant No. 2. The project consists of
four miles of 108" sewer pipe.
• Construction began in November, 2002 and was anticipated to be completes
by March 2004. Boyle Engineering has been providing engineering support
services, including geotechnical testing, to support the construction activities.
• Problems have occurred with the pipe being supplied for the project. These
problems are continuing to require additional engineering expertise and
support to resolve.
• Due to the pipe problems and lower production than anticipated, the project
will take much longer than anticipated to complete. The longer schedule has
increased engineering and other costs. including the geotechnical field
observation costs, which are the largest single item in the amendment.
• Since these extra costs are a direct result of the extended schedule, the
District may seek reimbursed by the contractor.
PRIOR COMMITTEE/BOARD ACTIONS
Please see attached PSA status report.
Page 1
PROJECT/CONTRACT COST SUMMARY
The authorization is within the project's budget for FY2004/05. $326.509 will
need to be reallocated from Contingency to Phase 4 Construction. Please see
the attached Budget Information Table.
BUDGETIMPACT
® This item has been budgeted. (Line item: FY 2004-05. Section 8,
Page 53: Capital Improvement Program, Collections Facilities, Bushard
Trunk Sewer Rehabilitation, Job No. 1-2-4.)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Amendment 6 to the contract was approved in December 2003. At this time, it
appeared the pipe problems were being resolved as well as other concerns with
the project. Since approval of amendment 6, pipe problems have continued as
well as problems with traffic control and production. The public impacts have
also become apparent. Boyle Engineering has been instrumental in working on
the pipe problems, traffic control concerns, and lessening the impacts to the
public. This amendment will provide compensation for these services as they
continue to be needed.
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program EIR certified on
October 27, 1999. A Notice of Determination was filed on October 29, 1999.
The project was included in Amendment No. 3 to the Program EIR approved on
December19, 2001. The amendment did not change the CEQA findings.
ATTACHMENTS
1. Budget Information Table
2. Professional Services Agreement Status Report
3. Letter Proposal for Amending Professional Services Contract, from Boyle
Engineering, dated October 1, 2004
LR:eh
H.\ntglobal\Agenda Draft Reports\PDC\I-2-4 AR 11-04-041.doc
Page 2
BUDGET INFORMATION TABLE
BUSHARD TRUNK SEWER REHABILITATION
JOB NO. 1-2-4,Amendment 7 Boyle Contract
Ev:
'r'1�1�`,� tt-g M
4-4, 11 `v`-1
MJ�U a��-,
5,6-a Ulii&a- A 2, g o� �'.l 5.1iR 5fli",0, 44 M
a
t
g�g,-
4
-:-ME ETAq Q
OR
V.NO
wn- t, MMI
-"6SE0
`14 !11 w--,I w " h
1 4111- hills
4-RE:,
k A 6,
4%
U
t.d.
FAN--
H.-
a
M
MW�t�Y, M! %,magg n MA
m
Phase 1 -Project Development $ 7,800 $ 74,000 $ 74,0001 $ 74,000 $ 74,000 S 73,763 100%
Phase 2-Preliminary Design $ 15,002 $ 9,200 $ 9,200 $ 9,200 $ 9,200 S 9,147 99%
Phase 3-Design $ 1,051,724 $ 2,690,400 $ 2,690.400 $ 2,690,400 $ 2,690,400 S 2,550,653 95%
Phase 4-Construction $ 24,180,051 S 35,447,995 $ 326,509 $ 35,774,504 $ 35,447,995 $ 326.509 $ 35,774,504 S 17,325,542 48%
Phase 5-Commissioning S 50,000 $ 50,000 $ $
Phase 6-Close-Out S 30.000 $ 30,000 $ $
Phase 7-Contingency $ 7,548,924 S 1,091,405 $ (326,509) $ 764,896 $
PROJECT TOTAL S 32,803,501 $ 39,393,000 $ $ 39,393,000 $ 37,979,235 $ 326,509 $ 38,548.104 S 19,959,105 52%
lReimbursable Costs
1PROJECT NET S 32,803,501 $ 39,393,000 $ $ 39,393,000 $ 37,979,235 1 $ 326,5091 $ 38,548,104 1 S 19,959,105 1 52%
PSA/Contract
Design PSA $ 269,900 S 2,019,411 $ 326,509 $ 2,345,920 $ 2,019,411 $ 326,509 $ 2,345,920 S 1,884,076 80%
Construction Contract $ 21,011,000 S 31,911,805 $ - $ 31,911,805 S 31,911,805 $ - $ 31,911,805 S 13,520 599 42%
*Table assumes Change Order#10 to the Construction Contract has been ratified.
EDM& 003781476
Professional Services Agreement Status Report
Bushard Trunk Sewer
Contract No. 1-24
Total Project Budget: $39,393,000
Consultant: Boyle Engineering Corporation
Date Amendment Description Cost Accumulated Costs
4/26/00 Original PSA Engineering design and construction support $845,300 $845,300
services for replacement and/or rehabilitation of
Bushard Trunk Sewer.
1/11/01 Amendment No.1 Increasing the utility search activities to include 37 $24,800 $870,100
additional potholes
3/21/01 Amendment No. 2 Provide for additional study of City of Huntington $12,808 $882,908
Beach sewer interfacing.
6/27/01 Amendment No. 3 Provide for groundwater hydraulic testing and $85,000 $967,908
include fiber optic cable conduit in the construction
documents
2/28/02 Amendment No. 4 Additional engineering services including $231,200 $1,199,108
geotechnical boring work, City sewer relocation,
study of flow handling for construction, Plant No. 2
entrance modifications, City storm drain relocation
at Adams Blvd., pavement survey, and the
connection to Plant No. 2.
10/23/02 Amendment 5 Additional engineering services for construction $555,403 $1,754,511
support including submittal review, consultation,
meetings, pipe inspection, materials inspection, and
eotechnical reviews.
EDMS 003781361 10/27/04
Date Amendment Description Cost Accumulated Costs
12/17/03 Amendment 6 Additional engineering services related to pipe $264,900 $2,019,411
problems, traffic control plans, pipe lining study,
large number of submittal reviews, and additional
meetings.
Pending Amendment 7 Additional engineering services related to project $326,509 $2,345,920
time extension, continued pipe problems, and
services to meet public concerns.
EDMS 003781361 10/27/04
PDC COMMITTEE Meeting Date To Bd.of Dir.
11/4/04 11/17/04
AGENDA REPORT Item Number Item Number
PDc04-95 13(h)
Orange County Sanitation District
FROM: Dave A. Ludwin, Director of Engineering
Originator: Alberto Acevedo, Project Manager
SUBJECT: ELECTRICAL EQUIPMENT REFURBISHMENT AND PROTECTION
JOB NO. SP-81
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 1 to the Professional Services Agreement with Fluor
Enterprises, Inc. for Electrical Equipment Refurbishment and Protection, Job No. SP-81,
providing for additional engineering services for an additional amount of $128,549.
increasing the total amount not to exceed to $214.049.
SUMMARY
• The original project included replacement of switchgear for the Return Activated
Sludge (RAS) equipment and the Dissolved Air Flotation Thickener (DAFT) at Plant
No. 2, addition of air conditioning systems in all the areas to be modified by this
project, and the addition of a roof over Distribution Center "D".
• During the presentation of Design Submittal 1 to the District, staff identified other
equipment that needed to be updated or replaced in this project in order to
implement the recommendations from project J-25-4, Electrical Power System
Studies. The J-25-4 studies identified deficiencies throughout Plant Nos. 1 and 2 in
the electrical power distribution systems, and made recommendations for
improvements. In addition, the studies recommended that the improvements be
added/included in other existing or planned Capital Improvement projects.
• This Amendment provides for the upgrade or replacement of the additional existing
electrical equipment items associated or located near the original project and
recommended by the J-25-4 study.
PRIOR COMMITTEE/BOARD ACTIONS
Please see the attached PSA Status Report.
PROJECT/CONTRACT COST SUMMARY
Approval of Amendment No. 1 is being requested in the amount of S128.549, as shown
in the attached Budget Information Table. Authorization of this amount is within the
project's budget for preparation of the Final Design. The total budget of $3,091,000 will
not change. To accurately account for cost, it was necessary to transfer $130,000 from
Revised 06/04/03 Page 1
Phase 4-Construction to Phase 2-Preliminary Design ($1,000) and Phase 3-Design W
($129,000). Please see the attached Budget Information Table.
BUDGETIMPACT
This item has been budgeted. (Line item section 8. Page 97)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
A PSA was awarded to Fluor Enterprises, Inc. at the June 2003 Board meeting. The
original design Scope of Work called for completion of a design to replace the
switchgear for the Return Activated Sludge Pumping System and the Sludge Thickener,
the replacement of the Motor Control Center (MCC) for the Sludge Thickener, design of
a roof over the Distribution Center "D", and the design of Air Conditioning equipment at
all locations where new equipment is to be installed.
This Amendment No. 1 will provide for the addition or replacement of other associated
equipment to the sludge systems in accordance with the recommendations identified in
the J-25-4 Electrical Power System Upgrade Program.
J-25-4 Study identified deficiencies throughout Plant Nos. 1 and 2 in the electrical power
distributions to all systems, and made recommendations to improve power systems.
The recommended improvements are to be added to existing projects. Items to be
included in this project are: high resistance grounding to existing transformers, install
new circuit breakers in the RAS — MCC, batteries in the RAS switchgear, relocation of
the bridge crane starter, and the replacement of the RAS transformers.
A detailed list of the design elements to be completed under this Amendment No. 1 is
attached in the Proposal Letter from Fluor Enterprises, Inc. dated October 7, 2004.
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
This project is exempt per CEQA and District Guidelines, Section 15301 (B). A Notice
of Exemption was filled with the County of Orange on May 22, 2003.
ATTACHMENTS
1. Budget Table
2. PSA Status Report
3. Proposal Letter from Fluor Enterprises, Inc. dated October 7, 2004
AAC:eh
H\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1104\Item 13(h).Fluor.doc
Revised 06/04103 Page 2
BUDGET INFORMATION TABLE
ELECTRICAL EQUIPMENT REFURBISHMENT AND PROTECTION
JOB NO. SP-81
.. ........
6 -i W"
'Ift AN -,ii 1 464
"6�IiR
... .. ....
ff E p
p 6. �,-n mom
P,
9; IN IA�
,MPR99D":� ;`,z,"`PR0j
w, Y. ',PA THORIZATIO
Y. f n-,A�Kjai`
cc:
a
V".,R
if rl 11 is ,RE;xo lexpp
Bbw
IR8
g�q -g,
31
fo 4�
.. .. . ..
Phase 1-Pro'ect Development $ 34,000 $ $ S $ 0%
Phase 2-Preliminary Design $ 92,000 $ 2,000 S 1,000 $ 3,000 $ 2,000 $ 1,000 S 3,000 $ 2,569 86%
Phase 3-Design S 427,000 S 328,000 S 129,000 $ 457.000 $ 328,000 $ 128,549 S 456,549 $ 78,192 17%
Phase 4-Construction $ 2,270.000 $ 2,270.000 S (130,000) $ 2,140,000 $ S - $ 4,927 0%
Phase 5-Commissioning $ 118,000 $ 118,000 $ 118,000 $ S $ 904 01%
Phase 6-Closeout 27,000 S 30,000 $ 30,000 $ S $ 0%
Contingency $ 344,000 S 343,000 343,000 $ S $ 0%
PROJECTTOTAL $ 3.312,000 1 $ 3,091,0001 S - 1 $ 3,091,000 $ 330,000 $ 129,5491 S 459,549 $ 86,592 19%
lReimbursable Costs
IPROJECT NET S 3,312,0001 S 3.091,000 1 S - $ 3.091,000 $ 330,000 $ 129,5491 S 459.5491$ 86,592 1
Design PSA I S 85.500 $ 128,5491 $ 214.049 11 $ 85,5001 S 128,5491 S 214,049 1 $ 0%
Construction Contract I S 1.716,3881 1 $ 1,716,3881 1 $ - 1 1 S -1 $ - 1 0%
EDMS 003781646 1 of 1 10/27/2004
Professional Services Agreement Status Report
Electrical Equipment Refurbishment & Protection
Job No. SP-81
Total Project Budget: $ 3,091,000
Consultant: Fluor Enterprises, Inc.
Start Date of Project: 06/30/2003
Date Addendum Description Cost AccumulatedCosts
6/25/2003 OPSAal Engineering Design $ 85,500 $ 85,500
Additional design work to upgrade or replace
11/04/04 1 additional electrical equipment to meet the $ 128,549 $ 214,049
requirements of J-25-4 project.
EDMS:003781648 1 of 1 10/27/2004
PDC COMMITTEE Meeting Date To Bd.of Dir.
11/04/04 11/17/04
AGENDA REPORT Item Number Item Number
PDC04-96 13(i)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Jim Burror, Engineering Supervisor
SUBJECT: Treatment Plant Strategic Plan Update, Job No. J-102
GENERAL MANAGER'S RECOMMENDATION:
Approve Professional Services Agreement with Black & Veatch Corporation to provide
an Energy Master Plan for the Treatment Plant Strategic Plan Update, Job No. J-102,
for an amount not to exceed $1,894,660.
SUMMARY:
• The District's power demand is expected to increase 100% when secondary
treatment expansion is complete in 2012. The District's power demand will be
roughly equal to Huntington Beach. The purpose of this project is to prepare an
Energy Master Plan for both treatment plants as part of the larger update of the
Orange County Sanitation District's (OCSD) Strategic Plan to meet this demand.
• OCSD has completed the planning for secondary treatment facilities and validated
the entire Capital Improvement Program (CIP). The last major planning element
needed for OCSD is a master plan of the electrical systems to ensure power is
provided reliably for treatment plant operations.
• The major future power supply issues facing OCSD include: (1) identifying the
power demands expected for OCSD, (2) selecting the best sources of power for the
expanded treatment plants, and (3) planning of the expansion of the power
systems. All of these must be done understanding the impacts to air quality and
compliance with existing and proposed regulations.
• The Professional Services Agreement (PSA) includes the following:
1. Data collection and verification
2. Power Generation and Supply System Analysis
3. Digester Gas Generation and Consumption Analysis
4. Grounding and Cathodic Protection Study
5. Perform an electricity system transient stability and load shedding analysis
6. Conceptual heat balance model for the treatment plants
7. Air Quality Analysis
8. Single-line diagrams, Facility Maps, and the OCSD Power Database Model and
System Analyses
9. Plant Uninterruptible Power System (UPS) Rehabilitation and Master Planning
10. Standby Power Generation Study
au,i.od W04103 Page 1
11. Siloxane Impact on Engines and Turbines Study
• Requests for proposals were sent to eleven engineering firms. One firm elected to
propose on its own, and two engineering firms teamed to provide one proposal to
OCSD. Eight consultants declined to propose on the work. The declinations
ranged from insufficient qualified staff to profit restriction exceptions.
• The proposals were evaluated in accordance with defined OCSD procedures and
based on these evaluations Staff recommends the approval of the PSA to Black &
Veatch Corporation, for an amount not to exceed $1,894,660. Staff believes the
negotiated fee and man-hour estimate reached with Black & Veatch is reasonable,
giving OCSD the best value while maintaining the scope of work and schedule.
• This project will also conduct work planned under two other capital projects, Job no.
SP-102, Digester Siloxane Removal Study and Job No. SP-107, Digester Gas
Venting Study. The two other projects budgeted at S200,000 will be cancelled. The
work was combined with this project because they are so closely related and impact
the planning of the power systems.
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
The FY2003/04 CIP includes a budget of $3,620.000 for the update of the Strategic
Plan. Included in that budget is an amount of S 2,550.000 for consultant professional
services for Job No. J-102. A total of $$1,894,660 is being requested. Please see the
attached budget information table.
BUDGETIMPACT
0 This item has been budgeted. (Line item: FY CIP Section 8, page 145)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
Please see the attached budget information table.
ADDITIONAL INFORMATION
Project Background
In July 2002, OCSD committed to planning, designing, and constructing upgrades to
meet the secondary standards of the Clean Water Act. This effort will impact the power
and electrical systems owned and operated by OCSD. Also. several existing and
proposed regulations are impacting OCSD's existing infrastructure including: air quality
regulations, power utility regulations, and health and safety regulations. This project will
Revised 06/04/03 Page 2
ti
tie these complex issues together, and layout a plan that will be both economical and
comply with anticipated requirements facing OCSD.
4
This project will update OCSD's two recent master planning efforts, the 1999 Strategic
Plan and the 2002 Interim Strategic Plan Update. This update will incorporate the
follow-up site planning and special studies resulting from the level of treatment decision
made by the Board of Directors in 2002. This effort is a key part to completely update
OCSD's Strategic Plan, which determines future treatment facilities, biosolids
management options, water reclamation options, and an implementation plan for
constructing these facilities. Planning work from the Interim Strategic Plan Update,
Ammonia Toxicity Study, Odor Control Master Plan, Long Range Biosolids
Management Plan, Full Secondary Treatment planning and siting studies, and recent
research and pilot testing studies will be utilized in this effort.
This project will also conduct work planned under two other capital projects, Job no. SP-
102, Digester Siloxane Removal Study and Job No. SP-107, Digester Gas Venting
Study. The two other projects budgeted at $200,000 will be cancelled. The work was
combined with this project because they are so closely related and impact the planning
of the power systems.
Proposal Review Process
A Request for Proposals was issued in August 2004 to eleven consulting firms. One
firm, Black and Veatch, elected to propose primarily on its own; and two engineering
firms, Malcolm Pirnie and Camp Dresser and Mckee (CDM), teamed to provide one
proposal to OCSD. Eight consultants declined to propose on the work. The
declinations ranged from insufficient qualified staff during the project period to profit
restriction exceptions.
The proposals to provide engineering services for Job No. J-102 were evaluated in
accordance with OCSD procedures and the Black & Veatch team received the highest
ranking. Additional information on the evaluation ranking is contained in the
attachment.
The selection committee agreed that the Black and Veatch team experience and
approach was superior. Through this team, OCSD will gain access to leading experts on
power system planning and reliability. Finally, Black and Veatch's approach to
consensus building on very complex issues in the proposal has been used successfully
on several of OCSD projects, and is very desirable with the tight project schedule.
ALTERNATIVES
This project is necessary for OCSD to achieve its goal of reliable full secondary
treatment. Power generation and distribution reliability would be greatly impacted if
portions of this project are not included.
CEQA FINDINGS
This project is a study and is exempt from CEQA.
Revised: 06104/03 Page 3
ATTACHMENTS �9
1. Budget Information Table
2. PSA Status Report
3. Summary of Staff Evaluation of Proposals and Staff Recommendation
JB:sa
HAntg1oba1\Agenda Draft ReportslPDC1J-102-0311D4AR.doc
Revised: 06104103 Page 4
BUDGET INFORMATION TABLE
STRATEGIC PLAN UPDATE— ENERGY MASTER PLAN, JOB NO. J-102
JOB NO. J-102
gn%fl 14 �"inijagw
-5100
.39
-VIR-1=;&MO� •�15;
4
N
Phase 1 -Project Development $ 3,620,000 $ 3,620,000 $ 3,620,000 $ 1,070,000 $ 1,894,660 S 2,964,660 $ 5,176 0%
Phase 2-Preliminary Design $ $ 0%
Phase 3-Design $ $ 0%
Phase 4-Construction $ $ $ 0%
Phase 5-Commissioning $ $ $ 00
Phase 6-Close-Out $ $ $ 0%
Phase 7-Contingency $ $ 0%
1PROJECT TOTAL $ 3,620.000 $ 3.620,000 $ $ 3,620,000 1,070,000 $ 1.894,660 S 2,964,660 $ 5,176 0%1
Reimbursable Costs 1110-1
1PROJECT NET $ 3,620,000 S 3,620,000 1 $ 1$ 3,620,000 $ 1,070,000 $ 1,894,660 S 2.964,660 $ 5,176 0%
PSA/Contract
Design PSA $ 2,550,000 $ 2,550,000 $ $ 2,550,000 $ - $ 1,894,660 S 1,894.660 $ 0%
Construction Contract $ $ $ - $
EDMS 0037819B2
Professional Services Agreement Status Report
Strategic Plan Update— Power Master Plan
Job No. J-102
Total Project Budget: $3,620,000
Consultant: Black & Veatch
Start Date of Project: July 2004
Date Addendum Description Cost Accumulated
Costs
Pending Original Strategic Plan Update - Energy Master Plan
PSA $1,894,660 $0
JB:sa
EDMS 003781953
10/27/04
4
Strategic Plan Update— Power Master Plan
J-102
Staff Evaluation of Proposals to Provide Engineering Services
The following interested consulting firms received Requests for Proposals:
• Camp Dresser & McKee, (CDM)
• Black & Veatch
• Brown and Caldwell
• Brinderson
• MARMAC
• Montgomery Watson Harza
• Malcolm Pirnie
• PSOMAS
• RW BECK
• Washington Group International
Brown and Caldwell, Brinderson, MARMAC, Montgomery Watson Harza, PSOMAS,
RW BECK, and Washington Group International all declined to submit a proposal.
Black & Veatch submitted a proposal using primarily their own resources, except for
field inspection services, which were not considered a primary part of the contract in the
evaluation. Malcolm Pirnie partnered with CDM. As a result, there were two (2)
responsive proposals received on September 23, 2004. Proposals were reviewed in-
house by a review panel from September 23 to October 18, 2004. Formal interviews
with both responsive teams and a Orange County Sanitation District (District) review
panel were conducted on October 17, 2004. The review panel consisted of six voting
members. Each proposal was graded from 1 to 10 (10 being best) in six categories
described below:
1. Understanding of the Project: The proposal should contain a description of the
project goals and objectives. The Consultant should be familiar with the District's
commitment to achieve full secondary treatment by December 2012. The
proposal should discuss how each of the major project elements contributes to
achieving the goals and objectives. To demonstrate an understanding of the
scope of work, the Consultant should have developed an outline of the project
and expected deliverables. The consultant should have also demonstrated its
knowledge of the related projects such as P1-101, P1-102, P2-90, P2-92, and
J-36, and how the J-102 project will interface with other District projects. The
proposal should provide insights into achieving the District's goal and objectives.
2. Project Schedule: The proposal should contain an outline of major project tasks
required to complete the work. The proposal should integrate the project tasks
P
with the District's efforts, estimate time lines for all tasks and identify task
constraints. A list of major project milestones should have been included. The
proposal should include a resource loaded schedule.
3. Project Approach: The proposal should outline the Consultant's approach to
the technical and management issues for the project. The proposal should
discuss the approach to developing the design details based on the projects
concept report. It should explain how the Consultant, working with in the
framework of the Scope of Work, will use technical memos, workshops and
focused meetings to achieve consensus in design details while incorporating the
Districts Design Guidelines into the project. It should also describe how the
Consultant Team will interface with the District's staff. A Project Management
Plan should have been included. The Plan should identify the key management
personnel and their roles and responsibilities. It is the intention of the District to
establish an integrated Project Team consisting of District staff, Consultant and
sub consultants. The plan should discuss how the project will be organized to
achieve a close working relationship among the team members. An outline of a
Quality Control Plan should have been included in this proposal.
4. Team Organization: The proposal should have a consultant project
organizational chart. It should describe the roles and responsibilities of the key
team members. The organizational chart shall include all team members
including planners and key resources. The proposal should have discussed the
work to be performed by each Team Member and the location where the work
will be performed. The relationship with sub consultants and any special teaming
arrangements should have been included. The proposal should describe how
the staff will meet the requirements of the resource loaded schedule.
5. Staff Qualifications: The proposal should describe the education, experience
and technical certifications of the proposed project staff. The staff member's
technical discipline and location where work will be performed should have been
included. Emphasis should have been placed on the qualifications and locations
of the Project and other key staff.
6. Related Company Experience: The proposal should describe the firm's recent
experience on projects which are similar to the Energy Master Plan effort as
described in the Scope of Work for individuals proposed on the project.
Two proposals were received: one from Black & Veatch and one from Malcolm Pirnie
teamed with CDM.
The two proposals were evaluated and all teams were interviewed on October 17, 2004.
After reviewing and grading the proposals and conducting the interviews, the two teams
were ranked according to the score achieved. The following summarizes the attached
ranking results:
1. Black & Veatch Corporation 1781 Points
2_ Malcolm Pirnie/CDM 1359 Points
The following is a summary of how the evaluation team collectively viewed the top
ranked consultant:
Black & Veatch Corp.
The Selection Committee gave the Black & Veatch proposal the highest ranking for
several reasons. Black & Veatch proposed a stronger management team with local
experience in large and similar projects and past successful project experience with the
District. The Black & Veatch approach to the project includes smaller groupings of staff
to manage and coordinate key related issues for the project. The Black & Veatch
proposal also provided for access and review by experts known worldwide for their
expertise and insight to power issues at wastewater treatment plants. Table A presents
the scores from each reviewer and proposed costs. The following attributes formed the
basis for the Black & Veatch high ranking:
1. Excellent management team
2. Strong knowledge of project needs
3. Strong knowledge of the key OCSD power issues
4. Support from expert known worldwide for their knowledge and insight.
Fee Proposals
After the final ranking of the technical proposals, the sealed fee proposals, submitted by
the firms, were opened. The total fees received from the consultants were:
1. Black & Veatch $1,894,660 (Final Negotiated Fee)
2. Malcolm Pirnie $1,799,653
Several meetings were held with Black &Veatch to discuss the basis of their estimate
and to clarify the District's scope of work. Based on these meetings, the Black & Veatch
negotiated total fee for engineering services is $1,894,660. This proposed fee is within
the 03/04 CIP budget of$2,550,000 for consultant services.
Summary
The evaluation committee gave Black and Veatch the highest score. On average, they
scored 31% higher. Black and Veatch's proposal has slightly fewer hours with a higher
average hourly rate resulting in a higher estimated fee, as shown in Table B. This is
primarily due to the senior level of the staff being applied to project when compared to
Malcolm Pirnie's proposal. The evaluation team was unanimous in their decision. Staff
believes the negotiated fee and man-hour estimate reached with Black & Veatch is
reasonable, giving the District the best value while maintaining the scope of work.
1
TABLE A
Strategic Plan Update— Energy Master Plan
Job No. J-102
CDM
Reviewer A 225 135
Reviewer B 326 262
Reviewer C 318 252
Reviewer D 331 281
Reviewer E 311 237
Reviewer F 270 192
TOTAL 1,781 1,359
SCORE
AVERAGE 297 226
SCORE
TECHNICAL j 2
RANKING
TABLE B
Strategic Plan Update— Energy Master Plan
Job No. J-102
Black & Veatch Malcolm I'li-nie
and CDM
Energy MP —' 13,229
Cost per hr,for �_r $136
Ph 2+3,$/hr
Overhead Rate, 10'S< 95%
* Final Negotiated Fees
JB:sa
EDMS 003781882
PDC COMMITTEE Meeting Date To Bd.of Dir.
11/04/04 11/17/04
AGENDA REPORT Item Number Item Number
PDC04-97 13
Orange County Sanitation District
FROM: David A. Ludwin, Director of Engineering
Originators: Jim Herberg, Engineering Manager
Jim Burror, Engineering Supervisor
SUBJECT: FUTURE ORANGE COUNTY SANITATION DISTRICT FLOW
PROJECTIONS FOR IRWD AND SAWPA
GENERAL MANAGER'S RECOMMENDATION
Concur with Staff recommendation to (1) Revise the 1999 Strategic Plan Year 2020 flow
projection for treatment capacity to provide 13 million gallons per day (mgd) of capacity for
the Santa Ana River Watershed Project Authority; (2) Design Plant No. 1 Secondary
Treatment Expansion, Job No. P1-102, for a first phase capacity of 60 mgd, with provisions
to expand to 80 mgd in the future; and (3) Establish a policy regarding the two contract
agencies served by Orange County Sanitation District (OCSD), such that OCSD plans,
designs, and constructs new facilities based on the adopted plans of the agency.
SUMMARY
• This issue was presented to the PDC Committee as an information item. The committee
directed Staff to move the item forward to the Board of Directors as an action item.
• OCSD's flow projections are based on service area population projections, and planned
discharges from Irvine Ranch Water District (IRWD) and the Santa Ana Watershed
Protection Agency (SAWPA). Approximately 50 percent of the flow increases over the
next 20 years are from these two agencies, which are served by OCSD under individual
contracts.
• These flow projections are used for planning and scheduling OCSD's new capital
improvements to increase treatment and disposal capacity.
• Today, Staff expects that flows will not materialize as projected in the 2002 Strategic
Plan Update based those agencies current planning documents. If OCSD continues to
construct new capacity, while flows from IRWD and SAWPA do not increase
accordingly, there is a risk of over-building treatment facilities leading to increased
expenditures and rate impacts. However, if OCSD limits construction of new capacity,
there is some risk that IRWD and SAWPA could increase their flows without leaving
OCSD sufficient time to design and construct needed facilities.
• IRWD and SAWPA are responsible for long term planning in their service areas,
including projection of flows that will be sent to OCSD for treatment. Thus, Staff
recommends that OCSD start a process to clarify our agreements with these agencies to
provide assurance that OCSD will only construct facilities that are needed, and that
proper financial commitments are made prior to constructing new capacity. The goal is to
Revised B/M98 Page 1
allow OCSD sufficient time (approximately seven to ten years) to construct new treatment
facilities in advance of the need with financial support from those agencies.
• With the upcoming secondary treatment expansion, there is an opportunity to achieve an
estimated $50 to $70M reduction in the Capital Improvement Program (CIP). This cost
savings would result from reducing projected flows from these agencies, allowing a
20 million gallons per day (mgd) reduction in the Secondary Treatment Expansion
projects at Reclamation Plant No. 1.
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
The potential 20 mgd reduction in project sizes for Reclamation Plant No. 1, Secondary
Treatment Expansion, Job No. P1-102, and Sludge Dewatering and Odor control at
Reclamation Plant No. 1, Job No. P1-101, is estimated at $50 to $70M reduction in the CIP.
The final amounts of the budgets would be reflected in the next Fiscal Year budget after
OCSD's annual validation process.
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
Not applicable (information item)
ADDITIONAL INFORMATION
Staff will provide an informational presentation at the November PDC Committee meeting.
OCSD's past master planning has incorporated a projected flow from IRWD of 17 million
mgd through the Year 2020. For future planning, we will be using a reduced flow of 10
mgd, since 7 mgd from IRWD is already modeled as part of Revenue Area (RA) 5, 6 and 7
flows. The remaining 10 MGD are flows from IRWD that are not treated in the Michelson
Water Reclamation Plant. In effect, the 7 mgd of flow was double-counted in our planning
assumptions. OCSD staff has discussed this issue with IRWD and received their
concurrence with OCSD revising planned flows from IRWD to 10 mgd.
SAWPA's current flow to OCSD averages 9 mgd. SAWPA has purchased 13 mgd of
capacity in OCSD's treatment facilities. The existing agreements allow SAWPA to purchase
up to 30 mgd of treatment capacity. However, SAWPA's recent planning reports indicate
that they are pursuing the removal of all flows from OCSD's treatment system.
Reducing IRWD's flow projection by 7 mgd and not expanding the treatment works for
SAWPA to 30 mgd, would reduce OCSD's year 2020 flow projection by 24 mgd. This
reduction would allow for a decrease in the initial phases of the Reclamation Plant No. 1
Secondary Treatment Expansion projects by 20 mgd. The estimated cost savings will
range between $50 and $70M in capital expenditures.
Revised: 6/10/98 Page 2
ALTERNATIVES
N/A
CEQA FINDINGS
Information Item, no action required.
ATTACHMENTS
None
JDH:JB:sa
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports11104\Item 136).Future Flow Projections.doc
Revised: 8110/98 Page 3
The FAHR minutes of the meeting held
November 10, 2004 were not available
for this mailing . These minutes will be
distributed at the November 17, 2004
Board of Directors meeting . Once the
minutes are finalized, they will also be
available on the District's website
(www.ocsd .com).
FAHR COMMITTEE Meeting Date To Bd.of Dir.
11/10/04 11/17/04
AGENDA REPORT Item Number Item Number
FAHR04-93 14 b
Orange County Sanitation District
FROM: Gary Streed, Director of Finance/Treasurer
Originator: Michael White, Controller
SUBJECT: TREASURER'S REPORT FOR THE MONTH OF OCTOBER 2004
GENERAL MANAGER'S RECOMMENDATION
Receive and file Treasurer's Report for the month of October 2004.
SUMMARY
Pacific Investment Management Co. (PIMCO), serves as the District's professional
external money manager, and Mellon Trust serves as the District's third-party custodian
bank for the investment program. Some funds are also deposited in the State of
California Local Agency Investment Fund for liquidity.
The District's Investment Policy, adopted by the Board, includes reporting requirements
as listed down the left most column of the attached PIMCO Monthly Report for the
"Liquid Operating Monies" and for the "Long-Term Operating Monies" portfolios. The
District's external money manager is operating in compliance with the requirements of
the Investment Policy. The portfolio contains no reverse repurchase agreements.
As shown on page 2 of the attached PIMCO's Performance Monitoring and Reporting
Report for the Long-Term Operating Monies, there are two investment policy
compliance exceptions. The first exception pertains to the duration of the Long-Term
Operating Monies portfolio. The District's investment policy states that the duration
shall be between 80% and 120% of the benchmark duration. The actual duration was
at 1.91 years, or 78% of the benchmark of 2.45 years as of October 31 , 2004. PIMCO
will seek opportunities to slightly increase the account's duration while maintaining a
conservative posture given the expectation of a rising rate environment.
The second exception pertains to the holding of one security within PIMCO's Long-Term
Operating Monies Portfolio that had an acceptable rating at the time of purchase but
has since fallen below the minimum rating allowed by the investment policy. The
District's investment policy requires a minimum rating of A3 by Moody's or A- by S&P,
with at least a BBB rating in the event of a split rating, at the time of purchase. The
rating exception pertains to the holding of a United Airlines (UAL) Asset Backed
Security with a par value of $1.6 million, representing 0.44 percent of the portfolio
holdings, whose rating from Moody's has fallen several times, from A3 to BA1 , then to
BA3, B3, B, and finally to CA. Likewise, the rating from Standard & Poor's has also
fallen several times, first from A- to BBB, then to BB, then to B+, B-, and finally to
CCC+. Both rating agencies have since withdrawn their ratings, Moody's in February
Rkdeptlagenda\Board Agenda Reports\2004 Board Agenda Reports\1104\Item 14(b).Treasurer Report.doc
Page 1
2004 and Standard & Poor's in June 2004. Although these ratings are less than what is
required at the time of purchase, PIMCO believes, based on the financial strength of
UAL and the underlying collateral of the security, that the District would suffer an
unwarranted loss if the security was sold at this time.
The District's investment policy does not require any action because of "credit watch"
notices or the decline in credit standing. However, PIMCO will continue to monitor the
credit for this security very closely.
Historical cost and current market values are shown as estimated by both PIMCO and
Mellon Trust. The District's portfolios are priced to market ("mark-to-market") as of the
last day of each reporting period. The slight differences in value are related to minor
variations in pricing assumptions by the valuation sources at the estimate date.
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Schedules are attached summarizing the detail for both the short-term and long-term
investment portfolios for the reporting period. In addition, a consolidated report of
posted investment portfolio transactions for the month is attached. The attached yield
analysis report is presented as a monitoring and reporting enhancement. In this report,
yield calculations based on book values and market values are shown for individual
holdings, as well as for each portfolio. Mellon Trust, the District's custodian bank, is the
source for these reports. Transactions that were pending settlement at month end may
not be reflected. Also provided is a summary of monthly investment balances and
transactions within the State of California Local Agency Investment Fund (LAIF).
These reports accurately reflect all District investments and are in compliance with
California Government Code Section 53646 and the District's Investment Policy.
Sufficient liquidity and anticipated revenues are available to meet budgeted
expenditures for the next six months.
The table on the following page details the book balances of the District's investment
accounts at month-end. A graphical representation of month-end balances is shown on
the attached bar chart.
HMeptkagendaZoard Agenda Reparts\2G04 Board Agenda Reports11104111em 14(b).Treasurer Report.doc
Page 2
a
Book Balances Estimated
Investment Accounts October 31,2004 Yield (%)
State of Calif. LAW $ 9,908,111 1.89
Union Bank Checking Account 853,721 1.47(1)
PIMCO—Short-term Portfolio 72,571,967 1.79
PIMCO-Long-term Portfolio 361,949,681 2.93
Petty Cash 4,000 N/A
TOTAL S445.2KAM 2.71
Debt Service Reserves w/Trustees $62 675 686 3.18
(1) This is the annualized yield for the month of September. The October annualized rate was
not available as of the date of this report.
ATTACHMENTS
1. Graph of Monthly Investment Balances by Type — Last Six Months
2. Investment Transactions and Balances in the State Local Agency Investment Fund
3. PIMCO Monthly Investment Recap & Yield Analysis Report
4. PIMCO Performance Monitoring Report — Liquid Operating Monies
5. PIMCO Performance Monitoring Report — Long-Term Operating Monies
6. Mellon Trust Asset Summary by Asset Type with Sectors — Liquid Operating Monies
7. Mellon Trust Asset Summary by Asset Type with Sectors — L-T Operating Monies
8. Mellon Trust Yield Analysis Report
9. Mellon Trust Asset Detail —Consolidated
10.Mellon Trust Transaction Detail - Consolidated
MW:bg
HAdep0agenda\Board Agenda Reports12004 Board Agenda Reports11104Htem 14(b).Treasurer Report.doc
Page 3
Prepared by Finance, 11/9/2004, 9:17 AM
' Monthly Investment Balances by Type-
Last Six Months
$700,000,000
$600,000,000
$500,000,000
$400,000,000
$300,000,000
$200,000,000
$100,000,000 -
$0
May June July August September October
2004 2004 2004 2004 2004 2004
®PIMCO- Long-term O PIMCO-Short-term ®COP Debt Reserves
IID LAIF El Bank Accts M Petty Cash
H:\dept\fin\EXCEL.dta\220\geggie\mo treas rpt\Monthly Investment Balances Graph1.xls
l
Orange County Sanitation District
Investment Transactions and Balances in the
State of California Local Agency Investment Fund
October 31, 2004
Par Value Book Value Market Value Rate Yield
Balance
October 1, 2004 $26,710,595 $26,710,595 $26,710,595 1.89 1.89
Deposits:
Total Deposits 0 0 0 0 0
Quarterly
Interest
Distribution 97,516 97,516 97,516 1.89 1.89
Withdrawals:
10/7/2004 (4,600,000) (4,600,000) (4,600,000) 1.89 1.89
10/13/2004 (2,600,000) (2,600,000) (2,600,000) 1.89 1.89
10/21/2004 (1,200,000) (1,200,000) (1,200,000) 1.89 1.89
10/22/2004 (6,800,000) (6,800,000) (6,800,000) 1.89 1.89
10/27/2004 (1,700,000) (1,700,000) (1,700,000) 1.89 1.89
Total Withdrawels (16,900,000) (16,900,000) (16,900,000) 1.89 1.89
Balance
October 31,2004 $9,908,111 $9,908,111 $9,908,111 1.89 1.89
P I M C O
November 8, 2004
Mr.Mike White,CPA
Controller
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley,CA 92708-7018
Dear Mike:
The following is a description of events in the bond markets during the month of October in
addition to an analysis of the strategies undertaken in the Orange County Sanitation District's
Long-Term and Liquid portfolios over the period. Also included is a section on our outlook and
preferred strategies to be pursued in your portfolios during the coming months.
Bond Market Recan:
U.S. bond sectors gained in October, as continued slow employment growth and higher oil prices
strengthened the market's view that the U.S. economy is slowing and that the pace of interest rate
increases by the Fed would be tempered. The yield on the benchmark 10-year Treasury note
finished the month at 4.12 percent, 10 basis points lower than last month; and Treasuries returned
0.79 percent. On a duration-adjusted basis, short and intermediate maturity TIPS outperformed
their nominal counterparts, while longer maturity TIPS underperformed. The Lehman Brothers
Global Real U.S. TIPS index returned 1.00 percent for the month. Mortgage-backed securities
returned 0.81 percent, exceeding Treasuries by 32 basis points after adjusting for duration. The
credit sector, represented by the Lehman Credit Index, returned 0.97 percent, outperforming
Treasuries for the month by 14 basis points. Within the sector, lower quality investment grade
corporates outperformed higher quality issues. BBB-rated corporate bonds generated 13 basis
points of excess return versus Treasuries, while AAA-rated corporate bonds produced 8 basis
points of excess returns, respectively.
October began with a weaker than expected Employment Situation Report (issued by the Bureau
of Labor Statistics), indicating that the economy created only 96,000 new jobs in September,
below consensus estimates of 158,000. The unemployment rate was unchanged at 5.4 percent as
the number of unemployed and the labor force contracted. The inflation rate for personal
consumption expenditures, the largest component of gross domestic product (GDP) was 1.1
percent in the third quarter, down from 3.1 percent in the second quarter. Excluding food and
v
Mr. Mike White, CPA November 8, 2004
Orange County Sanitation District Page 2
energy prices, personal consumption expenditures rose at a 0.7 percent rate, the lowest since the
fourth quarter of 1962. Influenced by rising energy prices and slowing job growth, the consumer
confidence index fell for a third straight month. The Commerce Department announced that
gross domestic product expanded at a 3.7 percent annual pace though the third quarter. Although
this was higher than the 3.3 percent in the second quarter, it fell short of the 4.3 percent forecasted
by 80 economists in a Bloomberg News survey.
Treasury yield changes during the month of October are summarized as follows:
■ 3-month bills: +19 basis points to 1.89%
■ 6-month bills: +13 basis points to 2.12%
■ 2-year notes: -6 basis points to 2.55%
• 5-year notes: -9 basis points to 3.28%
■ 10-year notes: -10 basis points to 4.02%
■ 30-year notes: -10 basis points to 4.79%
Performance Attribution:
Long-Term Portfolio
The Long-Term portfolio that PIMCO manages on behalf of Orange County Sanitation District
returned 0.45% on a total return basis for the month of October, performing in line with the
Merrill Lynch 1-5 year Government Corporate Index. The following points summarize returns
for the month ended October 31:
• The Long-Term portfolio underperformed the benchmark by 1 basis point for the month.
• For the twelve-month period,the Long-Term portfolio returned 3.17%, outperforming
the benchmark by 32 basis points.
• Portfolio duration, below the index,was negative for monthly performance as rates
generally fell during the month(for all but the very shortest maturities).
• Yield curve positioning similar to that of the index was neutral for performance.
• An underweight exposure to corporates was negative for performance, as corporates
outperformed Treasuries on a duration-adjusted basis.
• Exposure to mortgage-backed securities was positive for relative performance as the
sector outperformed Treasuries on a duration-adjusted basis.
• Substituting Treasury Inflation Protected Securities for nominal Treasuries was positive
for performance as short and intermediate TIPS outperformed their nominal counterparts
during the month.
v
Mr. Mike White, CPA November 8, 2004
Orange County Sanitation District Page 3
Liquid Portfolio
The Liquid portfolio that PIMCO manages on behalf of Orange County Sanitation District
generated a total return of 0.11% during the month of October, performing in line with the 3-
month Treasury Bill Index. The following points summarize returns for the period ending
October 31:
• The Liquid portfolio lagged the benchmark by 2 basis points for the month.
• For the twelve-month period, the Liquid portfolio returned 1.17%, outperforming the
benchmark by 8 basis points.
• Use of higher yielding securities such as commercial paper and short-term notes
contributed to performance.
Outlook and Strategy:
The global economy will muddle along over the next several quarters, with neither a boom nor a
bust likely to emerge. The U.S., Japan and China will grow faster than Europe. A global excess
of supply over demand in labor and product markets,as well as subdued unit labor costs,will
restrain inflation. Interest rates in the U.S. will be range-bound within 30-40 basis points,with a
bias toward slightly higher rates, given the very low absolute yields. Important aspects of the
outlook are:
■ A Boom Is Not In The Cards... More business investment will be needed to bolster global
demand growth now that fiscal and monetary stimulus is fading. Companies in the U.S.and Japan
have ample liquidity to boost investment after repairing their balance sheets over the last several
years, but a lack of confidence about future growth and lingering excess capacity will subdue the
"animal spirits"of corporate executives. Investment spending and hiring will be more modest than
would be expected given such robust corporate profits and cash flow.
• ...But Neither Is a Bust—Some growth in investment will be needed just to maintain the capital
stock of Corporate America, whose current spending is not keeping pace with depreciation.
Growth in consumer spending will remain a net positive,as a modest pickup in hiring will support
disposable incomes. Range-bound rates will keep household debt service at manageable levels.
• Higher Oil Prices Will Restrain Growth—Higher oil prices will also exert inflationary pressure
worldwide. Still,the adverse impact of rising oil prices will be more muted than in the past. Oil
prices in real terms are nowhere near levels seen in the late 1970s. Moreover,the world's reliance
on oil per unit of output has been considerably reduced since then.
The global economy looks stable, with prospects for modest growth, low volatility in financial
markets and range-bound interest rates. PIMCO remains concerned, however, about a tilt in the
direction of either deflation or inflation. The uncertain pace of investment and hiring could tilt
the balance of risks toward deflation. On the other hand, monetary policy remains simulative
despite the beginning of Fed tightening. Easy money combined with higher commodity prices
and dollar weakness could swing the economy back in the other direction. A prudent approach in
v
Mr. Mike White, CPA November 8, 2004
Orange County Sanitation District Page 4
this environment is to stay defensive and well diversified to avoid negative consequences of being
on the wrong side of any market dislocation. Key strategies will include:
• Tactically Flexible Interest Rate Strategies — Rates are more likely to rise than fall over a
secular,or three to five year time frame. We will therefore be wary of extending duration beyond
benchmark levels. At the low end of our forecasted interest rate range, we will target duration
about 0.5 year below the index and then shift toward a neutral posture should rates move back up.
• Structural Yield Curve Exposure — While short/intermediate maturities are close to full
valuation,we will retain a modest structural emphasis here.Because the short/intermediate portion
of the yield curve remains relatively steep,this"bulleted"posture can provide extra yield with less
price risk than a "barbell," or mix of short and long term bonds. In addition, longer maturities
would be more vulnerable if the economy tilted toward inflation.
• Retain Current Exposure to Core U.S. Sectors but Do Not Increase Allocations — Tight
corporate yield premiums offer too little reward to bear the risk of negative credit events if the
economy were to slow. While mortgage-backed bonds offer structural yield advantage and high
credit quality, they are fully valued for now as a result of unusually heavy demand from banks,
which are taking advantage of mortgages' attractive`carry"in a steep yield curve environment.
■ TIPS as an Out-of-Index Alternative—Better risk/reward trade-offs can be found outside of core
sectors. At current break-even inflation levels, real return bonds continue to provide an effective
hedge against secular inflation risk. They are also less volatile than nominal bonds in a rising rate
environment.
We look forward to discussing these and other topics with you in the near future.
Best regards,
Christine Telish, CFA John M. Miller,CFA
Vice President Senior Vice President
v
Orange County Sanitation District
for the month ending October 31,2004
Total Return Account-2o3
With Accrued Interest Without Accrued Interest
Market Value 364,759,272 361,957.298
Book Value 360,139.775 357.337,800
Yield to Maturity 2.93 2.95
Short Term Account-603
VM Accrued Interest Without Accrued Interest
Market Value 72,848.328 72,634,746
Book Value 72,833,972 72,620,391
Yield to Maturity 1.79 1.80
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 October 2004)
Page 1 of I
Liquid Operating Monies(603)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
• PIMCO $72,848,328
• Mellon $72,843,803
Historical Cost:
• PIMCO $72,833,972
• Mellon $72,884,833
15.1.2 MODIFIED DURATION Of Portfolio: 0.09
Of Index: 0.20
15.1.3 1% INTEREST RATE CHANGE Dollar Impact(gain/loss)of 1%Change: $65,563
15.1.4 REVERSE REPOS %of Portfolio in Reverse Repos:
see attached schedule 0%
15.1.5 PORTFOLIO MATURITY %of Portfolio Maturing within 90 days: 96%
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality: "AAA"
15.1.7 SECURITIES BELOW "A" RATING %of Portfolio Below"A": 0%
15.1.8 INVESTMENT POLICY COMPLIANCE "In Compliance" Yes
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%)by Portfolio Index
Period:
1 Month: 0.11 0.13
3 Months: 0.36 0.36
12 Months: 1.17 1.09
Fiscal Year-to-Date: 0.46 0.46
Commentary
• The Liquid portfolio lagged the benchmark by 2 basis points for the month,but performed in line with the benchmark fiscal year-to-date.
• PIMCO's emphasis on higher yielding securities such as commercial paper and short-term notes contributed to performance.
H:\deptTn\220\geWeTAHR\LIQ0800-04.10.RPT.doe
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 October 2004)
Page 1 of 2
Long-Term Operating Monies(203)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
• PIMCO $364,759,272
• Mellon $364,856,959
Historical Cost:
• PIMCO $360,139,775
• Mellon $362,062,473
15.1.2 MODIFIED DURATION Of Portfolio: 1.91
Of Index: 2.41
15.1.3 1%INTEREST RATE CHANGE Dollar fiMact(gain/loss)of 1%Change: $6 966 902
15.1.4 REVERSE REPOS %of Portfolio in Reverse Repos:
see attached schedule 0%
15.1.5 PORTFOLIO MATURITY %of Portfolio Maturing within 90 days: 9%
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality: AAA
15.1.7 SECURITIES BELOW"A"RATING %of Portfolio Below"A": 0%
15.1.8 INVESTMENT POLICY COMPLIANCE "In Compliance" No*
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%)by Portfolio Index
Period:
1 Month: 0.45 0.46
3 Months: 1.41 1.58
12 Months: 3.17 2.85
Fiscal Year-to-Date: 2.02 2.16
• The Long-Term portfolio underperformed the benchmark by 1 basis point for the month,and by 14 basis points fiscal year-to-date.
• Portfolio duration,below the index,was negative for monthly performance as rates generally fell during the month(for all but the very shortest maturities).
• Yield curve positioning similar to that of the index was neutral for performance.
• An underweight exposure to corporates was negative for performance,as corporates outperfored Treasuries on a duration-adjusted basis.
• Exposure to mortgage-backed securities was positive for relative performance as the sector outperformed Treasuries on a duration-adjusted basis.
• Substituting Treasury Inflation Protected Securities for nominal Treasuries was positive for performance as short and intermediate TIPS outperformed their nominal counterparts during the month.
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 October 2004)
Page 2 of 2
*Compliance Issues:
(1) As of month-end,the account's duration was 78%of the benchmark(the account's duration was at 1.91 years against the benchmark's duration of 2.45 years).
PIMCO will seek opportunities to slightly increase the account's duration while maintaining a conservative posture given the expectation of a rising rate environment.
(2) $1,600,000 par of United Airlines(UAL)Pass-Through 2001-1-C(Enhanced Equipment Trust Certificate(EETC)-909317BC2),6.831%coupon,3/01/2024
maturity,representing 0.44%of the portfolio holdings on a par basis was purchased on 8/10/2001;and subsequently downgraded by Moody's from A3 to BA (on
9/18/2001)and S&P from A-to BBB(on 9/20/2001). The security was further downgraded by Moody's from BA1 to BA3(on 12/21/2001)and by S&P from BBB to
BB(on 6/28/02). Following news of the possible bankruptcy filing,the security was further downgraded in August(B3 Moody's,B+by S&P). On November 29,
2002, S&P further downgraded this issue to B,and shortly thereafter on December 9,2002,downgraded the issue one notch further to B-. On August 7,2003,S&P
downgraded the issue to CCC+,while Moody's followed suit on August 28,2003 with a downgrade to CA. Both rating agencies have since withdrawn their ratings
(Moody's withdrew in February 2004 and S&P withdrew in June 2004). The District's investment policy requires a minimum rating of A3 by Moody's or A-by
S&P,with at least a BBB rating in the event of a split.
Record fuel costs and low air fares contributed to a$274 million third-quarter loss for UAL,which warned again that labor costs must be slashed again soon in order for it to
emerge from bankruptcy. The airline,which filed for Chapter 11 bankruptcy protection in December 2002,said operating revenue rose 7%. Looking ahead,the company said
it expects fourth-quarter mainline capacity to rise about 3%,though capacity for 2005 is expected to be about 3%lower than 2004. The company also stated that fuel expense
for the year is expected to be$1.2 billion higher than planned.
PIMCO continues to negotiate with United on our holdings and currently leads an ad hoc committee. This has been an extremely complicated effort due to the complex nature
of United's bankruptcy. These negotiations have required PIMCO's analysts access to non-public information and therefore sharing them results in parties becoming restricted.
In light of this extremely complicated bankruptcy,PIMCO continues to strive to act in the most prudent manner to obtain maximum recovery.
Split Rated Securities Still In Compliance_
The District's investment policy requires a minimum rating of A3 by Moody's or A-by S&P,with at least a BBB in the event of a split rating.
-$1,000,000 par of Ford Motor Credit securities(cusip 345397GV9 maturing 5115105),representing 0.27%of the portfolio holdings on a par basis(exposure was reduced in July
2004 as$2.5 million par matured). The securities were downgraded on 10/16/2001 by S&P from A to BBB+,then to BBB on 10/25/02,and then to BBB-on 11/13/03. Moody's
downgraded the securities on 1/16/02 from A2 to A3.
-$3,000,000 par of General Motors Acceptance Corp securities(cusip 370425SD3)maturing on August 28,2007,representing 0.82%of the portfolio holdings on a par basis. The
securities were downgraded on 10/16/2001 by S&P from A to BBB+,and a further downgrade to BBB occurring on 10/16/2002. The securities now cant'a Moody's rating of A3
after a further downgrade from A2 on 6/14/03.
-$1,750,000 par of Virginia Electric Power NT securities(cusip 927804EN0),maturing on March 31,2006,represents 0.48%of the portfolio holdings on a par basis. The security
was downgraded on 10/21/2002 by S&P from A-to BBB+,but continues to carry a Moody's rating of A3.
H.IdepiTiin 11201geggkiFAHRILT0800-04-10.RPT.doc
Asset Summary Report ID: GL8251
Base Currency: USD
@ Mellon by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LIQUID OJWR-PBfC0-OCSF07511102 10/31/2004 Status: FINAL
5,
2 , Cb Mk4 W f a S $e:
e
CASK&CASH EQUIVALENTS
U.S. DOLLAR
INTEREST 271,835.79 271,835.79 0.37% 0.00
CERTIFICATES OF DEPOSIT-DOMESTIC 3,600,000.000 3,600,000.00 3,600,000.00 4.94% 0.00
FED HM LOAN BNK-LESS THAN 1YR 14,400,000.000 14,348,938.00 14,348,938.00 19.70% 0.00
FEDERAL HOME LOAN MORTGAGE-LESS THAN I YR 14,400,000.000 14,338,956.39 14,338,956.39 19.68% 0.00
FNMA ISSUES-LESS THAN IYR 14,600,000.000 14,538,655.50 14,538,655.50 19.96% 0.00
MUTUAL FUNDS 2,637,483.860 2,637,483.86 2,637,483.86 3.62% 0.00
TREASURY BILLS-LESS THAN IYR 17,600,000.000 17,534,153.29 17,534,153.29 24.07% 0.00
U.S. DOLLAR 67,237,483.860 67,270,022.83 67,270,022.83 92.35% 0.00
CASH&CASH EQUIVALENTS 67,237,483.860 67,270,022.83 67,270,022.83 92.35% 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
BANKING&FINANCE 5,500,000.000 5,614,810.00 5,573,780.00 7.65% -41,030.00
TOTAL ASSETS-BASE: 72,737,483.860 72,884,832.83 72,843,802.83 100.00% -41,030.00
111812004 2:01:57PM PST 1 Workbench
Asset Summary Report ID; OLS251
Base Currency: USD
Mellon by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LONG TMW OPER-NMCO-OCOP07522202 10/31/2004 Status: FINAL
*�N_jfg, N;
71
,c
!"Ama,
'ell j"
W.01
F-A—B
%
esdffp
0 Ee-8 cri,P
CASH&CASH EQUIVALENTS
U.S. DOLLAR
PENDING TRADES -26,448,470.36 -26,448,470.36 -7.25% 0.00
INTEREST 2,907,278.20 2,907,278.20 0.80% 0.00
COMMERCIAL PAPER-DISCOUNT 10,600,000.000 10,529,050.47 10,529,050.47 2.89% 0.00
FED HM LOAN BNK-LESS THAN 1YR 3,200,000.000 3,183,943.56 3,183,943.56 0.87% 0.00
FEDERAL HOME LOAN MORTGAGE-LESS THAN 1 YR 7,600,000.000 7,563,959.11 7,563,959.11 2.07% 0.00
FNMA ISSUES-LESS THAN IYR 10,600,000.000 10,547,456.11 10,547,456.11 2.89% 0.00
MUTUAL FUNDS 1,153,726.320 1,153,726.32 1,153,726.32 0.32% 0.00
TREASURY BILLS-LESS THAN 1YR 16,000,000.000 15,843,937.78 15,843,937.78 4.34% 0.00
U.S.DOLLAR 49,153,726.320 25,280,881.19 25,280,881.19 6.93% 0.00
CASH&CASH EQUIVALENTS 49,153,726.320 25,280,881.19 25,280,881.19 6.93% 0.00
FV[ED INCOME SECURITIES
U.S. DOLLAR
ABS-AIRPLANE RECEIVABLES 1,600,000.000 1,600,000.00 127,904.00 0.04% -1,472,096.00
ABS-HOME EQUITY 744,359.220 744,359.22 742,963.55 0.20% -1,395.67
BANKING&FINANCE 16,000,000.000 16,023,653.50 16,249,758.00 4.45% 226,104.50
COLLATERALIZED MORTGAGE OBLIGATION COMM/( 1,920,261.520 1,920,261.52 2,090,396.69 0.57% 170,135.17
FHLMC MULTICLASS 856,962.940 857,875.88 862,061.87 0.24% 4,185.99
FHLMC POOLS 63,092.270 61,554.38 65,332.36 0.02% 3,777.98
FNMA POOLS 53,041,197.740 53,987,102.80 54,190,250.19 14.85% 203,147.39
FNMA REMIC 584,096.120 595,778.04 585,346.32 0.16% -10,431.72
GNMA MULTI FAMILY POOLS 4,080,954.310 4,058,366.65 4,125,847.28 1.13% 67,480.63
GNMA SINGLE FAMILY POOLS 589,541.860 618,113.29 626,594.29 0.17% 8,481.00
INDUSTRIAL 3,000,000.000 2,999,910.00 2,999,520.00 0.82% -390.00
INFLATION INDEXED SECURITIES 35,335,090.000 35,352,009.79 38,935,592.78 10.67% 3,583,582.99
INSURANCE 1,600,000.000 1,594,032.00 1,642,000.00 0.45% 47,968.00
PVT PLACEMENTS-MORE THN 1YR 752,000.000 826,199.84 826,199.84 0.23% 0.00
U.S. AGENCIES 33,916,053.030 34,883,722.02 34,948,023.66 9.58% 64,301.64
U.S. GOVERNMENTS 176,285,923.500 178,914,812.43 178,738,566.96 48.99% -176,245.47
UTILITY-ELECTRIC 1,750,000.000 1,743,840.00 1,819,720.00 0.50% 75,880.00
U.S. DOLLAR 332,119,532.510 336,781,591.36 339,576,077.79 93.07% 2,794,486.43
111812004 2:07.-50PM PST 1 Workbench
Asset Summary Report ID: GL8251
Base Currency: USD
@ Mellon by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LONG TERM 0PF-R-PrMCO-OCSF07522202 10/31/2004 Status: FINAL
FIXED INCOME SECURITIES 332,119,532.510 336,781,591.36 339,576,077.79 93.07% 2,794,486.43
TOTAL ASSETS-BASE: 381,273,258.830 362,062,472.55 364,856,958.98 100.00% 2,794,486.43
111812004 2.-07.-50PM PST 2 Workbench
YLDANAL YIELD ANALYSIS PAGE 1
OCSF07511102 2004/10/31 RUN DATE : 11/04/04
DISTRICT: LIQUID OPERATING RUN TIME : 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
CASH 6 CASH EQUIVALENTS
2,200,000.00 BANK OF AMERICA NA INSTL C/D .000 1.620 100.000 2,200,000.00 3.28
06050GEMB 1.620% 11/02/2004 DD 08/06/04 2,200,000.00 3.03
8,400,000.00 FEDERAL HOME LN BKS CONS DISC .000 .000 P-1 99.716 8,376,181.33 12.50
313384Q28 MAT 11/19/2004 A-1+ 8,376,181.33 11.54
5,000,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.551 4,977,541.67 7.42
313384559 MAT 12/08/2004 A-1+ 4,977,541.67 6.86
1,000,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.521 995,215.00 1.48
313385AW6 MAT O1/21/2005 A-1+ 995,215.00 1.37
7,300,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.601 7,270,844.61 10.85
313396N82 MAT 11/09/2004 A-1+ 7,270,844.61 10.02
1,000,000.00 FEDERAL HOME IN MTG CORP DISC .000 .000 P-1 99.586 995,860.00 1.48
313396P72 MAT 11/16/2004 A-1+ 995,860.00 1.37
6,100,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.545 6,072,251.78 9.06
313396T37 MAT 12/14/2004 A-1+ 6,072,251.78 8.37
1,000,000.00 FEDERAL NATL MTG ASSN DISC NT .000 .000 P-1 99.597 1,792,755.00 2.67
3135B8N27 MAT 11/3/2004 A-1+ 1,792,755.00 2.47
2,800,000.00 FEDERAL HATL MTG ASSN DISCOUNT .000 .000 P-1 99.592 2,788,569.39 4.16
31358SP82 MAT 11/17/2004 A-1+ 2,788,569.39 3.84
4,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.578 3,983,114.44 5.94
313588Q73 MAT 11/24/2004 A-1+ 3,983,114.44 5.49
6,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.570 5,974,216.67 8.91
31358OR64 MAT 12/01/2004 A-1+ 5,974,216.67 8.23
5,600,000.00 U S TREASURY BILL .000 .000 P-1 99.630 5,579,262.11 8.32
912795RK9 DUE 11/04/2004 DD 05/06/2004 A-1+ 5,579,262.11 7.69
2,000,000.00 U S TREASURY BILL .000 .000 P-1 99.600 1,991,997.50 2.97
912795RL7 DUE 11/12/2004 DD 05/13/2004 A-1+ 1,991,997.50 2.74
5,000,000.00 U S TREASURY BILL .000 .000 P-1 99.644 4,982,207.29 7.43
912795RM5 DUE 11/18/2004 DD 05/20/2004 A-1+ 4,982,207.29 6.87
YLDANAL YIELD ANALYSIS PAGE 2
OCSF07511102 2004/10/31 RUN DATE 11/04/04
DISTRICT: LIQUID OPERATING RUN TIME 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
5,000,000.00 U S TREASURY BILL .000 .000 P-1 99.614 4,980,686.39 7.43
912795RN3 DUE 11/26/2004 DD 05/27/2004 A-1+ 4,980,686.39 6.86
1,100,000.00 WELLS FARGO BK NA INSTL C/D .000 1.900 100.000 1,100,000.00 1.64
9497P1JE0 1.900% 12/15/2004 DD 10/14/04 1,100,000.00 1.52
300,000.00 WELLS FARGO BANK NA INSTL C/D .000 1.860 100.000 300,000.00 .44
9497P1LQ0 1.860% 12/06/2004 DD 10/08/04 300,000.00 .41
2,637,483.86 DREYFUS TREASURY CASH MGMT .000 1.545 AAA 100.000 2,637,483.86 3.93
996085247 AAA 2,637,483.86 3.63
-------- ------- ----------------- ---------
TOTAL CASH 6 CASH EQUIVALENTS .000 .108 66,998,187.04 100.00
66,998,187.04 92.31
FIXED INCOME SECURITIES
3,000,000.00 ASSOCIATES CORP NORTH AMER SR .000 6.468 AA1 102.421 3,112,350.00 55.12
046003FFI 6.625% 06/15/2005 DD 06/09/95 AA- 3,072,630.00 4.23
2,500,000.00 GENERAL ELEC CAP MTN #TR 00526 .000 2.004 AAA 100.046 2,502,460.00 44.87
36962GXX7 VAR RT 03/15/2005 DD 03/20/02 AAA 2,501,150.00 3.45
-------- ------- ----------------- ---------
TOTAL FIXED INCOME SECURITIES .000 5.177 5,614,810.00 100.00
5,573,780.00 7.68
-------- ------- ----------------- ---------
TOTAL .000 .170 72,612,997.04 100.00
72,571,967.04 100.00
YLDANAL YIELD ANALYSIS PAGE 3
OCSF07522202 2004/10/31 RUN DATE : 11/04/04
DISTRICT! LONG-TERM OPERATING RUN TIME : 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
CASH & CASH EQUIVALENTS
3,200,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.498 3,183,943.56 6.52
313385AW6 MAT O1/21/2005 A-1+ 3,183,943.56 .82
7,600,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.526 7,563,959.11 15.49
313397AD3 MAT O1/04/2005 A-1+ 7,563,959.11 1.95
9,900,000.00 FEDERAL KATI, MTG ASSN DISCOUNT .000 .000 P-1 99.505 9,850,995.00 20.17
313589AE3 MAT O1/05/2005 A-1+ 9,850,995.00 2.54
700,000.00 FEDERAL NATL MTG ASSN DISC NT .000 .000 P-1 99.494 696,461.11 1.42
313589BBS MAT O1/26/2005 A-1+ 696,461.11 .18
500,000.00 GENERAL ELEC CAP DISC .000 .000 P-1 99.450 497,249.58 1.01
36959HMG 11/16/2004 497,249.58 .13
200,000.00 GENERAL ELEC CAP DISC .000 .000 P-1 99.560 199,120.89 .40
36959HM20 12/02/2004 199,120.89 .05
9,900,000.00 GENERAL ELEC CAP DISC .000 2.054 P-1 99.320 9,832,680.00 20.13
36959HP43 02/04/2005 9,832,680.00 2.53
16,000,000.00 U S TREASURY BILL .000 .000 P-1 99.025 15,843,937.78 32.45
912795SG7 DUE 03/31/2005 DD 09/30/2004 A-1+ 15,843,937.78 4.08
1,153,726.32 DREYFUS TREASURY CASH MGMT .000 1.545 AAA 100.000 1,153,726.32 2.36
996085247 AAA 1,153,726.32 .30
-------- ------- ----------------- ---------
TOTAL CASH S CASH EQUIVALENTS .000 .274 48,822,073.35 100.00
48,822,073.35 12.58
FIXED INCOME SECURITIES
752,000.00 AIG SUNAMERICA GLOBAL REG S .000 5.325 109.867 826,199.84 .24
U00907AA0 5.850% 08/01/2008 DD 08/08/01 826,199.84 .21
22,000,000.00 COMMIT TO PUR FNMA SF MTG .000 4.900 AAA 102.031 22,405,625.00 6.61
O1F0504B9 5.000% 11/01/2019 DD 11/01/04 AAA 22,446,875.00 5.78
4,000,000.00 COMMIT TO PUR FNMA SF MTG .000 5.402 AAA 101.810 4,059,375.00 1.19
O1F0526B3 5.500% 11/01/2034 DD 11/01/04 AAA 4,072,400.00 1.05
YLDANAL YIELD ANALYSIS PAGE s 4
OCSF07522202 2004/10/31 RUN DATE 11/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME s 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
1,500,000.00 CIT GROUP INC NEW SR NT .000 2.309 A2 100.421 1,507,005.00 .44
125581AF5 VAR RT 09/22/2006 DD 09/23/03 A 1,506,315.00 .39
3,500,000.00 FEDERAL HOME LN BK CONS BDS .000 7.027 AAA 101.392 3,732,225.00 1.04
3133MAUN7 7.125% 02/15/2005 DD 02/08/00 AAA 3,548,714.05 .91
63,092.27 FBLMC GROUP #78-6064 .000 3.271 AAA 103.550 61,554.38 .01
31348SW23 6.384% 01/01/2028 DD 12/01/97 AAA 65,332.36 .02
11,350,000.00 FEDERAL NATL MTG ASSN DEBS .000 5.043 AAA 104.105 11,521,271.50 3.47
31359MJX2 5.250% 06/15/2006 DD 06/22/01 AAA 11,815,922.04 3.04
683,657.83 FNMA POOL #0254510 .000 4.883 AAA 102.402 704,167.56 .20
31371KV84 5.000% 11/01/2017 DD 10/01/02 AAA 700,081.62 .18
146,850.74 FNMA POOL #0254631 .000 4.883 AAA 102.402 151,256.27 .04
31371KY47 5.000% 02/01/2018 DD 01/01/03 AAA 150,378.59 .04
130,626.67 FNMA POOL #0254760 .000 4.984 AAA 102.371 134,545.46 .03
31371KSV9 5.000% 06/01/2018 DD 05/01/03 AAA 133,723.95 .03
59,334.15 FNMA POOL #0254866 .000 4.884 AAA 102.371 61,114.18 .01
31371LCB3 5.000% 09/01/2018 DD 08/01/03 AAA 60,741.02 .02
314,272.03 FNMA POOL #0254953 .000 4.887 AAA 102.309 318,298.65 .09
31371LE21 5.000% 11/01/2018 DD 10/01/03 AAA 321,527.28 .08
851,201.21 FNMA POOL #0254987 .000 4.894 AAA 102.168 862,107.22 .25
31371LF46 5.000% 12/01/2018 DD 11/01/03 AAA 869,652.91 .22
152,478.22 FNMA POOL #0323980 .000 5.698 AAA 105.305 159,196.79 .04
31374T2M0 6.000% 04/01/2014 DD 09/01/99 AAA 160,566.72 .04
24,876.09 FNMA POOL #0357328 .000 4.891 AAA 102.226 25,622.37 .00
31376J4M8 5.000% 01/01/2018 DD 01/01/03 AAA 25,429.91 .01
1,308,920.17 FNMA POOL #0357430 .000 4.884 AAA 102.371 1,323,645.52 .39
31376KA71 5.000% 09/01/2018 DD 09/01/03 AAA 1,339,955.85 .34
42,249.23 FNMA POOL #0456402 .000 5.698 AAA 105.305 44,110.82 .01
31381CCT2 6.000% 02/01/2014 DD 02/01/99 AAA 44,490.42 .01
101,291.49 FNMA POOL #0509649 .000 5.698 AAA 105.305 105,754.65 .03
31383QEWO 6.000% 09/01/2014 DD 09/01/99 AAA 106,664.69 .03
YLDANAL YIELD ANALYSIS PAGE s 5
OCSF07522202 2004/10/31 RUN DATE : 11/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOR YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
119,126.76 FNMA POOL #0535451 .000 5.705 AAA 105.180 124,375.78 .03
31384VZQB 6.000% 06/01/2015 DD 07/01/00 AAA 125,297.16 .03
313,444.13 FNMA POOL #0555363 .000 4.883 AAA 102.402 322,847.44 .09
31385W5Y1 5.000% 04/01/2018 DD 03/01/03 AAA 320,974.12 .08
32,483.46 FNMA POOL #0555453 .000 4.883 AAA 102.402 32,899.66 .00
31385XBW6 5.000% 05/01/2018 DD 04/01/03 AAA 33,263.82 .01
259,992.24 FNMA POOL #0555545 .000 4.883 AAA 102.402 267,792.02 .07
31385XES2 5.000% 06/01/2018 DD 05/01/03 AAA 266,238.14 .07
899,158.16 FNMA POOL #0555621 .000 4.894 AAA 102.168 909,273.69 .27
31385XG60 5.000% 07/01/2018 DD 06/01/03 AAA 918,649.44 .24
481,874.83 FNMA POOL #0681309 .000 4.883 AAA 102.402 496,331.07 .14
31391Y3S4 5.000% 02/01/2018 DD 02/01/03 AAA 493,451.10 .13
59,126.41 FNMA POOL #0681334 .000 4.883 AAA 102.402 60,900.20 .01
31391Y4T1 5.000% 02/01/2018 DD O1/01/03 AAA 60,546.83 .02
584,096.12 FNMA GTD REMIC P/T 02-76 PD .000 4.989 AAA 100.214 595,778.04 .17
31392FKF3 5.000% 08/25/2022 DD 10/01/02 AAA 585,346.32 .15
310,705.97 FNMA POOL #0684908 .000 4.883 AAA 102.402 314,686.90 .09
31400D3R1 5.000% 06/01/2018 DD 05/01/03 AAA 318,170.18 .08
173,555.81 FNMA POOL #0685200 .000 4.883 AAA 102.402 175,779.51 .05
31400EGH7 5.000% 03/01/2018 DD 03/01/03 AAA 177,725.21 .05
30,117.96 FNMA POOL #0685665 .000 4.883 AAA 102.402 31,021.50 .00
31400EW22 5.000% 02/01/2018 DD 02/01/03 AAA 30,841.50 .01
260,544.38 FNMA POOL #0686318 .000 4.883 AAA 102.402 268,360.72 .07
31400FPB7 5.000% 03/01/2018 DD 03/01/03 AAA 266,803.54 .07
103,870.15 FNMA POOL #0688739 .000 4.884 AAA 102.371 106,986.25 .03
31400JEL9 5.000% 06/01/2018 DD 06/01/03 AAA 106,333.00 .03
94,158.25 FNMA POOL #0689859 .000 4.884 AAA 102.371 85,236.53 .02
31400KMGB 5.000% 05/01/2018 DD 05/01/03 AAA 86,153.72 .02
596,958.61 FNMA POOL #0693834 .000 4.883 AAA 102.402 604,567.36 .17
31400PY74 5.000% 03/01/2018 DD 03/01/03 AAA 601,059.35 .15
YLDANAL YIELD ANALYSIS PAGE 6
OCSF07522202 2004/10/31 RUN DATE : 11/04/04
DISTRICT: LONG-TERM OPERATING RUN TINE : 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
207,045.39 FNMA POOL #0695852 .000 4.883 AAA 102.402 213,256.75 .06
31400SBV0 5.000% 05/01/2010 DD 05/01/03 AAA 212,019.32 .05
686,691.23 FNMA POOL #0695889 .000 4.884 AAA 102.371 707,291.98 .20
31400SC23 5.000% 05/01/2018 DD 05/01/03 AAA 702,973.30 .18
21,609.43 FNMA POOL #0697026 .000 4.883 AAA 102.402 22,256.70 .00
31400TLF2 5.000% 05/01/2018 DD 04/01/03 AAA 22,127.54 .01
208,822.66 FNMA POOL #0702210 .000 4.894 AAA 102.168 215,087.33 .06
31401ADP9 5.000% 05/01/2018 DD 05/01/03 AAA 213,349.36 .05
127,983.77 FNMA POOL #0702328 .000 4.883 AAA 102.402 129,623.56 .03
31401AHD2 5.000% 05/01/2018 DD 04/01/03 AAA 131,058.38 .03
262,789.83 FNMA POOL #0709148 .000 4.884 AAA 102.371 270,673.53 .07
31401HZM7 5.000% 06/01/2018 DD 06/01/03 AAA 269,020.81 .07
603,892.76 FNMA POOL #0709360 .000 4.884 AAA 102.371 611,630.15 .18
31401JB56 5.000% 07/01/2018 DD 06/01/03 AAA 618,211.60 .16
102,163.10 FNMA POOL #0709826 .000 4.884 AAA 102.371 103,472.06 .03
314013SP4 5.000% 06/01/2018 DD 06/01/03 AAA 104,595.48 .03
215,631.94 FNMA POOL #0709917 .000 4.884 AAA 102.371 218,394.72 .06
31401JVJ4 5.000% 06/01/2018 DD 06/01/03 AAA 220,744.77 .06
18,126.34 FNMA POOL #0709963 .000 4.894 AAA 102.168 18,358.59 .00
31401JWY0 5.000% 06/01/2018 DD 06/01/03 AAA 18,519.27 .00
578,352.94 FNMA POOL #0710235 .000 4.884 AAA 102.371 595,703.54 .17
31401KBC8 5.000% 06/01/2018 DD 06/01/03 AAA 592,066.21 .15
15,822.29 FNMA POOL #0713344 .000 4.984 AAA 102.371 16,296.95 .00
31401NP52 5.000% 06/01/2018 DD 06/01/03 AAA 16,197.45 .00
251,455.78 FNMA POOL #0713365 .000 4.884 AAA 102.371 254,677.55 .07
31401NQS1 5.000% 07/01/2018 DD 07/01/03 AAA 257,418.02 .07
706,096.92 FNMA POOL #0720319 .000 4.884 AAA 102.372 715,143.78 .21
31401WG45 5.000% 07/01/2018 DD 07/01/03 AAA 722,839.11 .19
2,009,634.03 FNMA POOL #0720369 .000 4.894 AAA 102.168 2,069,923.05 .60
31401WJN0 5.000% 06/01/2018 DD 06/01/03 AAA 2,053,197.37 .53
n
YLDANAL YIELD ANALYSIS PAGE s 7
OCSF07522202 2004/10/31 RUN DATE 11/04/04
DISTRICTS LONG-TERM OPERATING RUN TIME s 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
283,631.39 FNMA POOL #0721629 .000 4.884 AAA 102.371 292,140.35 .08
31401XVW4 5.000% 07/01/2018 DD 06/01/03 AAA 290,356.55 .07
232,288.66 FNMA POOL #0723487 .000 4.884 AAA 102.371 234,901.91 .07
31402AX04 5.000% 06/01/2018 DD 06/01/03 AAA 237,796.43 .06
384,203.96 FNMA POOL #0729601 .000 4.884 AAA 102.371 389,126.57 .11
31402BRW3 5.000% 07/01/2018 DD 07/01/03 AAA 393,313.78 .10
33,209.64 FNMA POOL #0732873 .000 4.884 AAA 102.371 33,635.12 .01
31402MFNS 5.000% 11/01/2018 DD 10/01/03 AAA 33,997.07 .01
603,842.23 FNMA POOL #0737130 .000 4.894 AAA 102.371 611,578.96 .18
31402S4P9 5.000% 10/01/2018 DD 10/01/03 AAA 618,159.87 .16
515,276.73 FNMA POOL #0738211 .000 4.894 AAA 102.168 521,878.73 .15
31402UDQ2 5.000% 10/01/2018 DD 10/01/03 AAA 526,446.51 .14
183,857.54 FNMA POOL #0738487 .000 4.887 AAA 102.309 186,213.21 .05
31402UNC2 5.000% 10/01/2018 DD 10/01/03 AAA 188,102.06 .05
670,846.16 FNMA POOL #0740471 .000 4.894 AAA 102.168 679,441.36 .20
31402WT40 5.000% 10/01/2018 DD 10/01/03 AAA 685,388.26 .18
742,040.26 FNMA POOL #0740748 .000 4.884 AAA 102.371 751,547.64 .22
31402W5B7 5.000% 10/01/2018 DD 11/01/03 AAA 759,634.70 .20
36,658.67 FNMA POOL #0743868 .000 4.894 AAA 102.168 37,128.35 .01
31403BMRI 5.000% 11/01/2018 DD 10/01/03 AAA 37,453.33 .01
971,313.42 FNMA POOL #0744008 .000 4.884 AAA 102.371 983,758.37 .29
31403BR54 5.000% 07/01/2018 DD 09/01/03 AAA 994,344.14 .26
150,132.10 FNMA POOL #0744316 .000 4.894 AAA 102.168 152,055.67 .04
31403B384 5.000% 09/01/2018 DD 09/01/03 AAA 153,386.55 .04
338,292.42 FNMA POOL #0747914 .000 4.887 AAA 102.309 342,626.79 .10
31403F3X0 5.000% 11/01/2018 DD 11/01/03 AAA 346,102.20 .09
199,856.29 FNMA POOL #0748400 .000 4.894 AAA 102.168 202,416.95 .06
31403GNR9 5.000% 08/01/2018 DD 09/01/03 AAA 204,188.62 .05
914,728.18 FNMA POOL #0748899 .000 4.893 AAA 102.195 926,448.13 .27
31403G7L0 5.000% 12/01/2018 DD 11/01/03 AAA 934,804.58 .24
YLDANAL YIELD ANALYSIS PAGE : 8
OCSF07522202 2004/10/31 RUN DATE : 11/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
2,072,795.57 FNMA POOL #0750377 .000 4.893 AAA 102.195 2,099,353.26 .62
31403JUA2 5.000% 11/01/2019 DD 11/01/03 AAA 2,118,289.16 .55
1,875,560.76 FNMA POOL #0750380 .000 4.893 AAA 102.195 1,899,591.40 .56
31403JUD6 5.000% 11/01/2018 DD 11/01/03 AAA 1,916,725.46 .49
167,449.83 FNMA POOL #0750445 .000 4.893 AAA 102.195 169,595.29 .05
31403JWE2 5.000% 11/01/2018 DD 11/01/03 AAA 171,125.01 .04
789,422.21 FNMA POOL #0751960 .000 4.894 AAA 102.168 799,536.69 .23
31403LMB1 5.000% 12/01/2018 DD 11/01/03 AAA 806,534.71 .21
835,894.05 FNMA POOL #0753425 .000 4.892 AAA 102.215 845,559.06 .25
31403NA23 5.000% 11/01/2018 DD 11/01/03 AAA 854,407.77 .22
586,885.03 FNMA POOL #0755165 .000 4.887 AAA 102.309 594,404.50 .17
31403Q6A3 5.000% 12/01/2018 DD 11/01/03 AAA 600,433.80 .15
906,020.28 FNMA POOL #0756372 .000 4.887 AAA 102.309 916,496.13 .27
31403SJRS 5.000% 11/01/2018 DD 11/01/03 AAA 926,936.57 .24
10,531.10 GNMA POOL #0421389 .000 6.109 AAA 106.395 11,052.73 .00
36206UC23 6.500% 04/15/2026 DD 04/01/96 AAA 11,204.51 .00
19,900.03 GNMA POOL #0449851 .000 6.143 AAA 105.809 20,885.71 .00
36208FVL0 6.500% 01/15/2028 DD O1/01/98 AAA 21,055.97 .01
36,621.99 GNMA POOL #0466845 .000 6.115 AAA 106.301 38,435.92 .01
36209BTA6 6.500% 06/15/2028 DD 06/01/98 AAA 38,929.46 .01
111,306.73 GNMA POOL #0468052 .000 6.115 AAA 106.301 116,819.89 .03
36209C5M4 6.500% 07/15/2028 DD 07/01/98 AAA 118,319.92 .03
146,405.50 GNMA POOL #0476041 .000 6.115 AAA 106.301 153,428.40 .04
36209MZE7 6.500% 06/15/2028 DD 06/01/98 AAA 155,630.19 .04
120,991.97 GNMA POOL #0478626 .000 6.115 AAA 106.301 126,795.81 .03
36209QVT9 6.500% 01/15/2029 DD O1/01/99 AAA 128,615.41 .03
28,852.41 GNMA POOL #0480598 .000 6.115 AAA 106.301 30,236.41 .00
36209S3F6 6.500% 10/15/2029 DD 10/01/98 AAA 30,670.34 .01
8,416.99 GNMA POOL #0512235 .000 6.118 AAA 106.239 8,833.89 .00
36211GBC6 6.500% 11/15/2029 DD 11/01/99 AAA 8,942.07 .00
YLDANAL YIELD ANALYSIS PAGE 9
OCSF07522202 2004/10/31 RUN DATE 11/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
106,515.14 GNMA POOL #0514326 .000 6.115 AAA 106.301 111,624.53 .03
36211JLF2 6.500% 07/15/2029 DD 07/01/99 AAA 113,226.42 .03
189,490.94 GNMA II POOL 10080395 .000 3.329 AAA 101.380 187,773.68 .05
36225CNM4 VAR RT 04/20/2030 DD 04/01/00 AAA 192,105.35 .05
1,732,824.36 GNMA II POOL #080408X .000 3.331 AAA 101.327 1,715,225.35 .51
36225CN28 6.500% 05/20/2030 DD 05/01/00 AAA 1,755,820.67 .45
376,688.63 GNMA II POOL #0080900 .000 3.000 AAA 99.986 366,506.25 .11
36225DAA2 VAR RT 05/20/2034 DD 05/01/04 AAA 376,636.84 .10
1,385,231.01 GNMA II POOL #0080965 .000 3.468 AAA 100.924 1,384,365.23 .41
36225DCBB VAR RT 07/20/2034 DD 07/01/04 AAA 1,398,034.70 .36
3,000,000.00 GENERAL MTRS ACCEP CORP SR NT .000 5.872 A3 104.312 3,064,350.00 .92
370425SD3 6.125% O8/28/2007 DD O8/29/02 BBB- 3,129,360.00 .81
3,500,000.00 GOLDMAN SACHS GRP MTN #TR00194 .000 2.276 AA3 100.187 3,507,850.50 1.03
38141EJB6 VAR RT 10/27/2006 DD 10/29/03 A+ 3,506,545.00 .90
800,000.00 GOLDMAN SACHS GRP MTN #TR00207 .000 2.426 AA3 100.156 800,000.00 .23
38141EJQ3 VAR RT 07/23/2009 DD 07/23/04 A+ 801,248.00 .21
3,000,000.00 GOLDMAN SACHS GROUP INC SR NT .000 4.032 AA3 102.296 3,030,030.00 .90
38141GCS1 4.125% 01/15/2008 DD O1/13/03 A+ 3,068,880.00 .79
3,000,000.00 KRAFT FOODS INC NT .000 1.960 A3 99.984 2,999,910.00 .89
50075NAJ3 VAR RT 11/26/2004 DD 11/26/02 BBB+ 2,999,520.00 .77
3,200,000.00 MORGAN STANLEY NT .000 3.855 AA3 100.515 3,149,248.00 .94
61746BAL0 3.875% 01/15/2009 DD O1/13/04 A+ 3,216,480.00 .83
744,359.22 RESIDENTIAL ASSET 03-RS11 AIIB .000 2.267 AAA 99.813 744,359.22 .21
760985K83 VAR RT 12/25/2033 DD 12/30/03 AAA 742,963.55 .19
2,985,923.50 SBA GTD DEV PARTN 2001-20C 1 .000 5.833 AAA 108.685 2,985,923.50 .95
83162CLJ0 6.340% 03/01/2021 AAA 3,245,250.96 .84
1,920,261.52 SBA GTD PARTN CTFS SBIC-PS O1 .000 6.100 AAA 108.860 1,920,261.52 .61
831641DD4 6.640% 02/10/2011 DD 02/21/01 NR 2,090,396.69 .54
1,600,000.00 UNITED AIRLS PASSTHRU 01-1 C .000 85.452 WR 7.994 1,600,000.00 .03
909317BC2 6.831% 03/01/2010 DD O8/22/01 A- 127,904.00 .03
YLDANAL YIELD ANALYSIS PAGE : 10
OCSF07522202 2004/10/31 RUN DATE : 11/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOR YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
20,000,000.00 U S TREASURY NOTES .000 5.787 AAA 108.000 22,620,312.50 6.36
9128272J0 06.250% 02/15/2007 DD 02/15/97 AAA 21,600,000.00 5.56
3,523,890.00 US TREASURY INFLATION INDEX NT .000 3.285 AAA 110.344 3,833,391.35 1.14
9128273T7 3.625% 01/15/2008 DD 01/15/98 AAA 3,888,401.18 1.00
15,042,560.00 US TREASURY INFLATION INDEX NT .000 3.414 AAA 113.500 16,667,920.11 5.02
9128274Y5 3.875% 01/15/2009 DD 01/15/99 AAA 17,073,305.60 4.40
3,900,000.00 U S TREASURY NOTES .000 5.551 AAA 103.594 4,288,149.14 1.18
9128276N7 05.750% 11/15/2005 DD 11/15/00 AAA 4,040,166.00 1.04
17,600,000.00 U S TREASURY NOTES .000 3.341 AAA 101.030 17,405,000.00 5.23
912828BT6 3.375% 12/15/2008 DD 12/15/03 AAA 17,781,280.00 4.58
27,500,000.00 U S TREASURY NOTES .000 2.736 AAA 100.520 27,463,468.63 8.14
912828CM0 2.750% 06/30/2006 DD 06/30/04 AAA 27,643,000.00 7.12
49,000,000.00 U S TREASURY NOTES .000 2.736 AAA 100.500 49,103,927.41 14.50
912828CQ1 2.750% 07/31/2006 DD 07/31/04 AAA 49,245,000.00 12.68
55,300,000.00 US TREASURY NOTES .000 2.380 AAA 99.790 55,048,031.25 16.25
912828CU2 2.375% 08/31/2006 DD 08/31/04 AAA 55,183,870.00 14.21
1,750,000.00 VIRGINIA ELEC 6 PWR O1 SER A .000 5.530 A3 103.984 1,743,840.00 .53
927804EN0 5.750% 03/31/2006 DD 03/27/01 BBB+ 1,819,720.00 .47
16,768,640.00 US TREASURY INFLATION INDEX NT 3.817 3.149 AAA 107.188 14,850,698.33 5.29
9128272M3 3.375% 01/15/2007 DD O1/15/97 AAA 17,973,886.00 4.63
15,500,000.00 FEDERAL NATL MTG ASSN DEBS 5.967 7.026 AAA 101.404 16,154,410.00 4.62
31359HFHI 7.125% 02/15/2005 DD 02/14/00 AAA 15,717,637.05 4.05
856,962.94 FHLMC MULTICLASS MTG SER E3 A 6.316 3.632 AAA 100.595 857,875.88 .25
3133TCE95 VAR RT 08/15/2032 DD 12/01/97 AAA 862,061.87 .22
528,130.19 GNMA GTD REMIC TR 2000-9 FH 6.320 2.373 AAA 100.662 528,130.19 .15
3837H4NX9 VAR RT 02/16/2030 AAA 531,626.41 .14
227,031.75 GNMA II POOL /080088M 6.705 3.330 AAA 101.362 231,998.08 .06
36225CC20 7.3758 06/20/2027 DD 06/01/97 AAA 230,123.01 .06
169,687.62 GNMA II POOL #0080023 6.992 4.533 AAA 102.027 172,498.06 .05
36225CAZ9 VAR RT 12/20/2026 DD 12/01/96 AAA 173,126.71 .04
. 4
i
YLDANAL YIELD ANALYSIS PAGE 11
OCSF07522202 2004/10/31 RUN DATE : 11/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 15.34.10
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
2,100,000.00 FEDERAL NATL MTG ASSN DEBS 7.113 5.852 AAA 113.204 2,030,133.00 .70
31359MEY5 6.625% 09/15/2009 DD 09/01/99 AAA 2,377,293.03 .61
1,000,000.00 FORD MOTOR CR CO NT 7.582 6.612 A3 102.093 965,170.00 .30
345397GV9 6.750% 05/15/2005 DD 05/24/93 BBB- 1,020,930.00 .26
937,922.84 WMP/NUNTOON PAIGE #000-11150 7.684 7.352 AAA 102.016 917,552.33 .28
302998GE3 7.500% 12/01/2030 DD 10/21/99 AAA 956,831.08 .25
1,600,000.00 ALLSTATE CORP SR UT 7.967 7.674 Al 102.625 1,594,032.00 .48
020002AL5 7.875% 05/01/2005 DD 05/01/00 A+ 1,642,000.00 .42
-------- ------- ----------------- ---------
TOTAL FIXED INCOME SECURITIES .163 4.517 336,781,591.36 100.00
339,576,077.79 87.45
-------- ------- ----------------- ---------
TOTAL .159 4.428 385,603,664.71 100.00
388,398,151.14 100.00
Asset Detail Report ID: GL8013
Base Currency: USD
@ Mellon by Currency Alternate Base Currency:
Exchange Rate:
OCSDLCOMOLZDATED-OCSG000 10000 10/31/2004 Status: FINAL
AT
U.S.DOLLAR
CASH as CASH EQUWALENTS
PAYABLE FOR INVESTMENTS -26,465,000.00 -26,465,000.00 -6.05% 0.00
PURCHASED
INTEREST RECEIVABLE 3,179,113.99 3,179,113.99 0.73% 0.00
RECEIVABLE FOR INVESTMENTS 16,529.64 16,529.64 0.00% 0.00
SOLD
BANK OF AMERICA NA INSTL C/D 100.0000 2,200,000.000 2,200,000.00 2,200,000.00 0.50% 0.00
1.620% 11/02/2004 DD 08/06/04
SEC ID:06050GEM8
FEDERAL HOME LN BKS CONS DISC 99.7164 8,400,000.000 8,376,181.33 8,376,181.33 1.91% 0.00
MAT 11/19/2004
SEC ID:313384Q28
FEDERAL HOME LN BK CONS DISC N 99.5508 5,000,000.000 4,977,541.67 4,977,541.67 1.14% 0.00
MAT 12/08/2004
SEC ID:313384S59
FEDERAL HOME LN BK CONS DISC N 99.5215 4,200,000.000 4,179,158.56 4,179,158.56 0.95% 0.00
MAT01/21/2005
SEC ID:313385AW6
FEDERAL HOME LN MTG CORP DISC 99.6006 7,300,000.000 7,270,844.61 7,270,844.61 1.66% 0.00
MAT 11/09/2004
SEC ID:313396N82
FEDERAL HOME LN MTG CORP DISC 99.5860 1,000,000.000 995,860.00 995,860.00 0.23% 0.00
MAT 11/16/2004
SEC ID:313396P72
FEDERAL HOME LN MTG CORP DISC 99.5451 6,100,000.000 6,072,251.78 6,072,251.78 1.39% 0.00
MAT 12/14/2004
SEC ID:313396T37
FEDERAL HOME LN MTG CORP DISC 99.5258 7,600,000.000 7,563,959.11 7,563,959.11 1.73% 0.00
MAT01/04/2005
SEC ID:313397AD3
FEDERAL NATL MTG ASSN DISC NT 99.5975 1,800,000.000 1,792,755.00 1,792,755.00 0.41% 0.00
MAT 11/3/2004
SEC ID:313588N27
FEDERAL NATL MTG ASSN DISCOUNT 99.5918 2,800,000.000 2,788,569.39 2,788,569.39 0.64% 0.00
MAT 11/17/2004
SEC ID:313588P82
FEDERAL NATL MTG ASSN DISCOUNT 99.5779 4,000,000.000 3,983,114.44 3,983,114.44 0.91% 0.00
MAT 11/24/2004
SEC ID:313588Q73
111812004 2:10:11 PM PST 1 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
Mellon by Currency Alternate Base Currency:
e Rate::
OCSDLCONSOLFDATED OCSGOOO 10000 10/31/2004 ExchangS tatus FINAL
FEDERAL NATL MTG ASSN DISCOUNT 99.5703 6,000,000.000 5,974,216.67 5,974,216.67 1.36% 0.00
MAT 12/01/2004
SEC ID: 3135881164
FEDERAL NATL MTG ASSN DISCOUNT 99.5050 9,900,000.000 9,850,995.00 9,850,995.00 2.25% 0.00
MAT 01/05/2005
SEC ID:313589AE3
FEDERAL NATL MTG ASSN DISC NT 99.4944 700,000.000 696,461.11 696,461.11 0.16% 0.00
MAT01/26/2005
SEC ID: 31358913138
GENERAL ELEC CAP DISC 99.4499 500,000.000 497,249.58 497,249.58 0.11% 0.00
11/16/2004
SEC ID:36959HLGO
GENERAL ELEC CAP DISC 99.5604 200,000.000 199,120.89 199,120.89 0.05% 0.00
12/02/2004
SEC ID: 36959HM20
GENERAL ELEC CAP DISC 99.3200 9,900,000.000 9,832,680.00 9,832,680.00 2.25% 0.00
02/04/2005
SEC ID:36959HP43
U S TREASURY BILL 99.6297 5,600,000.000 5,579,262.11 5,579,262.11 1.27% 0.00
DUE 11/04/2004 DD 05/06/2004
SEC ID:912795RK9
U S TREASURY BILL 99.5999 2,000,000.000 1,991,997.50 1,991,997.50 0.46% 0.00
DUE ll/12/2004 DD 05/13/2004
SEC ID: 912795RL7
U S TREASURY BILL 99.6441 5,000,000.000 4,982,207.29 4,982,207.29 1.14% 0.00
DUE 11/18/2004 DD 05/20/2004
SEC ID:912795RMS
U S TREASURY BILL 99.6137 5,000,000.000 4,980,686.39 4,980,686.39 1.14% 0.00
DUE 11/26/2004 DD 05/27/2004
SEC ID: 912795RN3
U S TREASURY BILL 99.0246 16,000,000.000 15,843,937.78 15,843,937.78 3.62% 0.00
DUE 03/31/2005 DD 09/30/2004
SEC ID: 912795SG7
WELLS FARGO BK NA INSTL C/D 100.0000 1,100,000.000 1,100,000.00 1,100,000.00 0.25% 0.00
1.900% 12/15/2004 DD 10/14/04
SEC ID:9497PIJEO
WELLS FARGO BANK NA INSTL C/D 100.0000 300,000.000 300,000.00 300,000.00 0.07% 0.00
1.860% 12/06/2004 DD 10/08/04
SEC ID:9497P1LQ0
DREYFUS TREASURY CASH MGMT 100.0000 3,791,210.180 3,791,210.18 3,791,210.18 0.87% 0.00
SEC ID: 996085247
TOTAL CASH&CASH EQUIVALENTS 116,391,210.180 92,550,904.02 92,5SO,904.02 21.14% 0.00
111812004 2:10:1 IPM PST 2 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
Mellon by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOZZDATED-OCSGWO 10000 10/31/2004 Status: FnIAL
q
'4�
:
Ot Uft eid k677d
7 "" A .M "olmrkdf lfte 0Ng �
tj a7
-
• Wx
FIXED INCOME SECURITIES
AIG SUNAMERICA GLOBAL REG S 109.8670 752,000.000 826,199.84 826,199.84 0.19% 0.00
5.850%08/01/2008 DD 08/08/01
SEC ID: U00907AAO
COMMIT TO PUR FNMA SF MTG 102.0313 22,000,000.000 22,405,625.00 22,446,875.00 5.13% 41,250.00
5.000% 11/01/2019 DD 11/01/04
SEC ID: 0 1 F0504139
COMMIT TO PUR FNMA SF MTG 101.8100 4,000,000.000 4,059,375.00 4,072,400.00 0.93% 13,025.00
5.500% 11/01/2034 DD 11/01/04
SEC ID: 01170526133
ALLSTATE CORP SR NT 102.6250 1,600,000.000 1,594,032.00 1,642,000.00 0.38% 47,968.00
7.875%05/01/2005 DD 05/01/00
SEC ID: 020002ALS
ASSOCIATES CORP NORTH AMER SR 102.4210 3,000,000.000 3,112,350.00 3,072,630.00 0.70% -39,720.00
6.625%06/15/2005 DD 06/09/95
SEC ID: 046003FFI
CIT GROUP INC NEW SR NT 100.4210 1,500,000.000 1,507,005.00 1,506,315.00 0.34% -690.00
VAR RT 09/22/2006 DD 09/23/03
SEC ID: 12558 1AF5
WMP/HUNTOON PAIGE#000-11150 102.0160 937,922.840 917,552.33 956,831.08 0.22% 39,278.75
7.500% 12/01/2030 DD 10/21/99
SEC ID: 302998GE3
FEDERAL HOME LN BK CONS BDS 101.3918 3,500,000.000 3,732,225.00 3,548,714.05 0.81% -183,510.95
7.125%02/15/2005 DD 02/08/00
SEC ID: 3133MAUN7
FHLMC MULTICLASS MTG SER E3 A 100.5950 856,962.940 857,875.88 862,061.87 0.20% 4,185.99
VAR RT 08/15/2032 DD 12/01/97
SEC ID:3133TCE95
FHLMC GROUP#78-6064 103.5505 63,092.270 61,554.38 65,332.36 0.01% 3,777.98
6.384%01/01/2028 DD 12/01/97
SEC ID: 31348SWZ3
FEDERAL NATI,MTG ASSN DEBS 113.2044 2,100,000.000 2,030,133.00 2,377,293.03 0.54% 347,160.03
6.625%09/15/2009 DD 09/01/99
SEC ID: 31359MEY5
FEDERAL NATL MTG ASSN DEBS 101.4041 15,500,000.000 16,154,410.00 15,717,637.05 3.59% -436,772.95
7.125%02/15/2005 DD 02/14/00
SEC ID:31359MFH1
FEDERAL NATL MTG ASSN DEBS 104.1050 11,350,000.000 11,521,271.50 11,815,922.04 2.70% 294,650.54
5.250%06/15/2006 DD 06/22/01
SEC ID:31359MJX2
FNMA POOL#0254510 102.4023 683,657.830 704,167.56 700,081.62 0.16% -4,085.94
5.000% 11/01/2017 DD 10/01/02
SEC ID: 31371 KVB4
111812004 2:10:1 1PM PST 3 Workbench
Asset Detail Report M: GL8013
Base Currency: USD
@ Mellon by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOLIDATED OCSGWO 1.0000 10/31/2004 Status: FINAL
-Z§
FNMA POOL#0254631 102.4023 146,850.740 151,256.27 150,378.59 0.03% -877.68
5.000%02/01/2018 DD 0 1/0 1/03
SEC ID:31371KY47
FNMA POOL#0254760 102.3711 130,626.670 134,545.46 133,723.95 0.03% -821.51
5.000%06/01/2018 DD 05/01/03
SEC ID: 31371K5V9
FNMA POOL#0254866 102.3711 59,334.150 61,114.18 60,741.02 0.01% -373.16
5.000%09/01/2018 DD 08/01/03
SEC ID:3137ILCB3
FNMA POOL#0254953 102.3086 314,272,030 318,298.65 321,527.28 0.07% 3,228.63
5.000% 11/01/2018 DD 10/01/03
SEC ID:31371LE21
FNMA POOL#0254987 102.1677 851,201.210 862,107.22 869,652.91 0.20% 7,545.69
5.000% 12/01/2018 DD 11/01/03
SEC ID: 31371LF46
FNMA POOL#0323980 105.3047 152,478.220 159,196.79 160,566.72 0.04% 1,369.93
6.000%04/01/2014 DD 09/01/99
SEC ID:31374T2M0
FNMA POOL#0357328 102.2263 24,876.090 25,622.37 25,429.91 0.01% -192.46
5.000%01/01/2018 DD 01/01/03
SEC ID: 31376J4M8
FNMA POOL#0357430 102.3711 1,308,920.170 1,323,645.52 1,339,955.85 0.31% 16,310.33
5.000%09/01/2018 DD 09/01/03
SEC ID:31376KA71
FNMA POOL#0456482 105.3047 42,249.230 44,110.82 44,490.42 0.01% 379.60
6.000%02/01/2014 DD 02/01/99
SEC ID:31381CCT2
FNMA POOL#0509649 105.3047 101,291.490 105,754.65 106,664.69 0.02% 910.04
6.000%09/01/2014 DD 09/01/99
SEC ID:31383QEWO
FNMA POOL#0535451 105.1797 119,126.760 124,375.78 125,297.16 0.03% 921.38
6.000%06/01/2015 DD 07/01/00
SEC ID: 31384VZQ8
FNMA POOL#0555363 102.4023 313,444.130 322,847.44 320,974.12 0.07% -1,873.32
5.000%04/01/2018 DD 03/01/03
SEC ID:31385W5Y1
FNMA POOL#0555453 102,4023 32,483.460 32,899.66 33,263.82 0.01% 364.16
5.000%05/01/2018 DD 04/01/03
SEC ID: 31385XBW6
FNMA POOL#0555545 102.4023 259,992.240 267,792.02 266,238.14 0.06% -1,553.88
5.000%06/01/2018 DD 05/0 1/03
SEC ID: 31385XES2
111812004 2:10.1 IPM PST 4 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
/ Mellon by Currency Alternate Base Currency:
Exchange Rate:
OCSDCONSOUDATED-OCS000010000 10/31/2004 Status: FINAL
.. - -. „::.- ," ......•_;..t yc ..:..;_: .`.<. <Qs. r�. _ a:. ri '•i-''{ .k '71
.. ..^ :..: -».r.Yh#,.rc ... ..., ; (, t.. -:SS .r
Y .. &•- ,,mot.,,_ J ., r, .. -.:_-- r-'v .., d'.. i'�... .;� .%x{t k:a 'W 1".' `:t. �.r
.y} k.t•.. . , . ,� . ,. = �. Nit iT"
..: .r, .,. ,!,•2;xn, .:f, ,f; ,. rv.. 9t_,t-., .za.. .;.:ii•�.,,, :ss,. �a,, mz. a5t,. L.zF,a ,,n -
c' '... � _j_ .�, :.�! ;� + � ik,.�, �` r: � •ttyr _ ,j; i �+. •:S a ;y 4,i.e._
3iI..;. ;.< - ... ... ........,�-., .'2? ,i...-.f•s�.r:. ,%sar�''�ctc. N:��s���
4 rre F.: _ ,r fit _ Qt _i '`__ y,y ��s tpif
.a,.t ,,., -i zirl_ :. ..t•a,�- rr 1r Ce) "�?:. _.`mac• fti iJ7;s., a.. 'i�_.... �, '-des'�i i�G4 Yilggi
+.9.c. i_: '? y. ..r ,Z:!u r t' y}� fit,:rr' ...t 't• . �.q
DeBCl� � 9tL 9 - 'S pAr a 5 Ji413:jf_ x. , w i> 1, F.: t
roc. :r11 : =re - I::.ak BA8ea7l. a:... �'OLstr f � ztTBasea
bases B�s�
FNMA POOL#0555621 102.1677 899,158.160 909,273.69 918,649.44 0.21% 9,375.75
5.000%07/01/2018 DD 06/01/03
SEC ID:31385XG68
FNMA POOL#0681309 102.4023 481,874.830 496,331.07 493,451.10 0.11% -2,879.97
5,000%02/01/2018 DD 02/01/03
SEC ID:31391Y3S4
FNMA POOL#0681334 102.4023 59,126.410 60,900.20 60,546.83 0.01% -353.37
5,000%02/01/2018 DD 01/01/03
SEC ID:31391Y4T1
FNMA GTD REMIC P/T 02-76 PD 100.2140 584,096.120 595,778.04 585,346.32 0.13% -10,431.72
5.000%08/25/2022 DD 10/01/02
SEC ID:31392FKF3
FNMA POOL#0684908 102.4023 310,705.970 314,686.90 318,170.18 0.07% 3,483.28
5.000%06/01/2018 DD 05/01/03
SEC ID:31400D3R1
FNMA POOL#0685200 102.4023 173,555.810 175,779.51 177,725.21 0.04% 1,945.70
5.000%03/01/2018 DD 03/01/03
SEC ID:31400EGH7
FNMA POOL#0685665 102.4023 30,117.960 31,021.50 30,841.50 0.01% -180.00
5.000%02/01/2018 DD 02/01/03
SEC ID:31400EW22
FNMA POOL#0686318 102.4023 260,544.380 268,360.72 266,803.54 0.06% -1,557.18
5.000%03/01/2018 DD 03/01/03
SEC ID:31400FPB7
FNMA POOL#0688739 102.3711 103,870.150 106,986.25 106,333.00 0.02% -653.25
5.000%06/01/2018 DD 06/01/03
SEC ID:31400JEL9
FNMA POOL#0689859 102.3711 84,158.250 85,236.53 86,153.72 0.02% 917.19
5.000%05/01/2018 DD 05/01/03
SEC ID:31400KMG8
FNMA POOL#0693834 102.4023 586,958.610 604,567.36 601,059.35 0.14% -3,508.01
5.000%03/01/2018 DD 03/01/03
SEC ID:3140OFY74
FNMA POOL#0695852 102.4023 207,045.390 213,256.75 212,019.32 0.05% -1,237.43
5.000%05/01/2018 DD 05/01/03
SEC ID:31400SBVO
FNMA POOL#0695889 102.3711 686,691.230 707,291.98 702,973.30 0.16% -4,318.68
5.000%05/01/2018 DD 05/01/03
SEC ID:31400SC23
FNMA POOL#0697026 102.4023 21,608.430 22,256.70 22,127.54 0.01% -129.16
5.000%05/01/2018 DD 04/01/03
SEC ID:31400TLF2
111812004 2:10:11PM PST 5 Workbench
Asset Detail Report m: GL8013
Mellon Alternate Baase Currency:se Currency: IISD
by Currency Exchange Rate:
OCSIICON50UDATED-OCS000010000 10/31/2004 statue: FINAL
,..us ,5. .... 4' 8
� ',
_.
? kt y> a ' 1ice'.• �
., ',•F a +`hs""A r,.. _.1:• .. -1�.�,'v.IT t Cz.: �...`. y,c <,ali�t6 YiYe ,,, #....
.: ;.,.:_..�•_...:... x....y€�itr`t Lt�.;�'�"� �`�at�r88$eE•bi. a,$iWr@$, t ,� ;�:,�, Cif "y3ir.. �.�AS@'�..#,C•»,� tt,.t.�.:1�� @:�F�`r. t'3..:#. .s� .���!�,�4, �$
a
f
FNMA POOL#0702210 102.1677 208,822.660 215,087.33 213,349.36 0.05% -1,737.97
5.000%05/01/2018 DD 05/01/03
SEC ID:31401ADP9
FNMA POOL#0702328 102.4023 127,983.770 129,623.56 131,058.38 0.03% 1,434.82
5.0000/6 05/01/2018 DD 04/01/03
SEC ID:31401AHD2
FNMA POOL#0709148 102.3711 262,789.830 270,673.53 269,020.81 0.06% -1,652.72
5.000%06/01/2018 DD 06/01/03
SEC ID: 31401HZM7
FNMA POOL#0709360 102.3711 603,892.760 611,630.15 618,211.60 0.14% 6,581.45
5.000%07/01/2018 DD 06/01/03
SEC ID:31401JB56
FNMA POOL#0709826 102.3711 102,163.100 103,472.06 104,585.48 0.02% 1,113.42
5.000%06/01/2018 DD 06/01/03
SEC ID:31401JSP4
FNMA POOL#0709917 102.3711 215,631.940 218,394.72 220,744.77 0.05% 2,350.05
5.0009/6 06/01/2018 DD 06/01/03
SEC ID:31401JVJ4
FNMA POOL#0709963 102.1677 18,126.340 18,358.59 18,519.27 0.00% 160.68
5.000%06/01/2018 DD 06/01/03
SEC ID:31401JWYO
FNMA POOL#0710235 102.3711 578,352.940 595,703.54 592,066.21 0.14% -3,637.33
5.000%06/01/2018 DD 06/01/03
SEC ID:31401KBC8
FNMA POOL#0713344 102.3711 15,822.290 16,296.95 16,197.45 0.00% -99.50
5.000%06/01/2018 DD 06/01/03
SEC ID: 3140INP52
FNMA POOL 40713365 102.3711 251,455.780 254,677.55 257,418.02 0.06% 2,740.47
5.000%07/01/2018 DD 07/01/03
SEC ID: 31401NQSI
FNMA POOL#0720319 102.3711 706,096.920 715,143.78 722.839.11 0.17% 7,695.33
5.000%07/01/2018 DD 07/01/03
SEC ID:31401WG45
FNMA POOL#0720369 102.1677 2,009,634.030 2,069,923.05 2,053,197.37 0.47% -16,725.68
5.000%06/01/2018 DD 06/01/03
SEC ID:31401 WJNO
FNMA POOL#0721629 102.3711 283,631.390 292,140.35 290,356.55 0.07% -1,783.80
5.000%07/01/2018 DD 06/01/03
SEC ID:31401XVW4
FNMA POOL#0723487 102.3711 232,288.660 234,901.91 237,796.43 0.05% 2,894.52
5.000%06/01/2018 DD 06/01/03
SEC ID:31402AXQ4
111812004 2:10.1IPM PST 6 Workbench
Asset Detail Report m: OLS013
Base Currency: USD
/ Mellon by Currency Alternate Base Currency:
Exchange Rate:
C CO11T5ouDATED-ocsc;00O 1000O 10/31/2004 Status: FINAL
iV
- x :9 a' wr, �,. :15 ,1. t•. C 5_ t r.,� _,¢a:.� ,3 �ss
:. 1_. .....,:.,-?- �'�`" -;,;. ,P ,.. .;..a.t ..• .�`�:::. ..: _;x .,;:�.�iz1: tEh � ^'.e K'�t{_�?^S.h £!. -�r.•'' � ,x. ;r �
,.,.I�t�-. _ .a.._ .Jyr: ..,a��� .:; �t - ?L. t.. _- :t.r _ •��i GtrL �L�•.A- 4._ -
-T'•u.�II .:. � t,,,. �:t k' .., 't' n /� ,t 7, t.$•� � ue�- , f..:. _,. 0 �' >• T"Ona
Ve'.i t� Z.. :�.4 ,r,Cosfi u P h. .(;... �' i LO$e%
® w�xri• � Y
.1 i. t';1.;.an4 .,,--1, }. �. ^` �f..+- C.:• .+..-.!•.. ;��::ta.� I . z�." ..ram +,-k'Px P�.•:. �.i.�., ..a' ., .: •..-x
P.,Lqq- ` .-i i,..a s_a. Y ;{.rAt.Y-•f• i�LI6`'S'''k, r� ri- ` �cs.SFl•"' $ ., fx� r 1 x'; if r., `.. . �
!'_.. �'_�,F.:.�•."•t�,.�.L�A.<��BpltY'�- SI;�����.�� �x.�."dS �� $ r .,.�'� "' �''i'Ba�e�.•; _�: .f;.�`Otre. 'f�'-,'t'�'�fsase•-:
FNMA POOL#0729601 102.3711 384,203.960 389,126.57 393,313.78 0.09% 4,187.21
5.000°/a 07/01/2018 DD 07/01/03
SEC ID:31402HRW3
FNMA POOL#0732873 102.3711 33,209.640 33,635.12 33,997.07 0.01% 361.95
5.000% 11/01/2018 DD 10/01/03
SEC ID:31402MFN5
FNMA POOL#0737130 102.3711 603,842.230 611,578.96 618,159.87 0.14% 6,580.91
5.000% 10/01/2018 DD 10/01/03
SEC ID: 31402S4P9
FNMA POOL#0738211 102.1677 515,276.730 521,878.73 526,446,51 0.12% 4,567.78
5.000% 10/O1/2018 DD 10/01/03
SEC ID:31402UDQ2
FNMA POOL#0738487 102.3086 183,857.540 186,213.21 188,102.06 0.04% 1,888.85
5.000% 10/01/2018 DD 10/01/03
SEC ID:31402UNC2
FNMA POOL#0740471 102.1677 670,846.160 679,441.36 685,388.26 0.16% 5,946.90
5.000% 10/01/2018 DD 10/01/03
SEC ID:31402WT40
FNMA POOL#0740748 102.3711 742,040,260 751,547.64 759,634.70 0.17% 8,087.06
5.000% 10/01/2018 DD 11/01/03
SEC ID:31402W5H7
FNMA POOL#0743868 102.1677 36,658.670 37,128.35 37,453.33 0.01% 324.98
5.000% 11/01/2018 DD 10/01/03
SEC ID: 31403BMR1
FNMA POOL#0744008 102.3711 971,313.420 983,758.37 994,344.14 0.23% 10,585.77
5.000%07/01/2018 DD 09/01/03
SEC ID:31403BR54
FNMA POOL#0744316 102.1677 150,132.100 152,055.67 153,386.55 0.04% 1,330.88
5.000%09/01/2018 DD 09/01/03
SEC ID:31403B3Z4
FNMA POOL#0747914 102.3086 338,292.420 342,626.79 346,102.20 0.08% 3,475.41
5.000% 11/01/2018 DD 11/01/03
SEC ID:31403F3X0
FNMA POOL#0748400 102.1677 199,856.290 202,416.95 204,188.62 0.05% 1,771.67
5.000%08/01/2018 DD 09/01/03
SEC ID:31403GNR9
FNMA POOL#0748899 102.1948 914,728.180 926,448.13 934,804.58 0.21% 8,356.45
5.000% 12/01/2018 DD 11/01/03
SEC ID:31403G7L0
FNMA POOL#0750377 102.1948 2,072,795.570 2,099,353.26 2,118,289.16 0.48% 18,935.90
5.000% 11/01/2018 DD 11/01/03
SEC ID:31403JUA2
I11812004 2:10:IIPM PST 7 Workbench
Asset Detail Report ID: OLS013
Base Currency. USD
@ Mellon by Currency Alternate Base Currency:
Exchange Rate:
OC8D,CONSOZJJ)ATED-OCSGOOO 10000 10/31/2004 Status: FINAL
w,
"�7
iL
-TCCAI�
FNMA POOL#0750380 102.1948 1,875,560.760 1,899,591.40 1,916,725.46 0.44% 17,134.06
5.000% 11/01/2018 DD 11/01/03
SEC ID:31403JUD6
FNMA POOL#0750445 102.1948 167,449.830 169,595.29 171,125.01 0.04% 1,529.72
5.000% 11/01/2018 DD 11/01/03
SEC ID:31403JWE2
FNMA POOL#0751960 102.1677 789,422.210 799,536.69 806,534.71 0.18% 6,998.02
5.000% 12/01/2018 DD 11/01/03
SEC ID:31403LMH1
FNMA POOL#0753425 102.2148 835,894.050 845,559.06 854,407.77 0.20% 8,848.71
5.000% 11/01/2018 DD 11/01/03
SEC ID:31403NA23
FNMA POOL#0755165 102.3086 586,885.030 594,404.50 600,433.80 0.14% 6,029.30
5.000% 12/01/2018 DD 11/01/03
SEC ID:31403Q6A3
FNMA POOL#0756372 102.3086 906,020.280 916,496.13 926,936.57 0.21% 10,440.44
5.000% 11/01/2018 DD 11/01/03
SEC ID:31403SJR8
FORD MOTOR CR CO NT 102.0930 11000,000.000 965.170.00 1,020,930.00 0.23% 55,760.00
6.750%05/15/2005 DD 05/24/93
SEC ID:345397GV9
GNMA POOL#0421389 106.3945 10.531.100 11,052.73 11,204.51 0.00% 151.78
6.500%04/15/2026 DD 04/01/96
SEC ID:36206UC23
GNMA POOL#0449851 105.8087 19,900.030 20,885.71 21,055.97 0.00% 170.26
6.500%01/15/2028 DD 01/01/98
SEC ID:36208FWLO
GNMA POOL#0466845 106.3008 36,621.990 38,435.92 38,929.46 0.01% 493.54
6.500%06/15/2028 DD 06/01/98
SEC ID:36209BTA6
GNMA POOL#0468052 106.3008 111,306.730 116,819.89 118,319.92 0.03% 1,500.03
6.500%07/15/2028 DD 07/01/98
SEC ID:36209C5M4
GNMA POOL#0476041 106.3008 146,405.500 153,428.40 155,630.19 0.04% 2,201.79
6-900%06/15/2028 DD 06/01/98
SEC ID:36209MZE7
GNMA POOL#0478626 106.3008 120,991.970 126,795.81 128,615.41 0.03% 1,819.60
6.500%01/15/2029 DD 0 1/0 1/99
SEC ID:36209QVT,9
GNMA POOL#0480,998 106.3008 28,852.410 30,236.41 30,670.34 0.01% 433.93
6.500% 10/15/2028 DD 10/01/98
SEC ID:36209S3F6
111812004 2.10:1 IPM pST 8 Workbench
Asset Detail Report ID: GL8013
@ Mellon Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
0CSDLC0AfS0LTZk4TED-OCSCvOOO 10000 10/31/2004 Status: FERAL
.T, alp-
�a��I I'. I�,�',i�,I,�.�.111�
GNMA POOL#05 12235 106.2383 8,416.990 8,833.89 8,942.07 0.00% 108.18
6.500% 11/15/2029 DD 11/01/99
SEC ID:36211 GBC6
GNMA POOL#0514326 106.3008 106,515.140 111,624.53 113,226.42 0.03% 1,601.89
6.500%07/15/2029 DD 07/01/99
SEC ID: 3621 IJLF2
GNMA H POOL#0080023 102.0267 169,687.620 172,498.06 173,126.71 0.04% 628.65
VAR RT 12/20/2026 DD 12/01/96
SEC ID:36225CAZ9
GNMA H POOL 4080088M 101.3616 227,031.750 231,998.08 230,123.01 0.05% -1,875.07
7.375%06/20/2027 DD 06/01/97
SEC ID:36225CC20
GNMA JJ POOL#0080395 101.3797 189,490.940 187,773.68 192,105.35 0.04% 4,331.67
VAR RT 04/20/2030 DD 04/01/00
SEC ID: 36225CNM4
GNMA II POOL#080408X 101,3271 1,732,824.360 1,715,225.35 1,755,820.67 0.40% 40,595.32
6.500%05/20/2030 DD 05/01/00
SEC ID:36225CN28
GNMA[I POOL#0080900 99.9863 376,688.630 366,506.25 376,636.84 0.09% 10,130.59
VAR RT 05/20/2034 DD 05/01/04
SEC ID:36225DAA2
GNMA 11 POOL#0080965 100.9243 1,385,231.010 1,384,365.23 1,398,034.70 0.32% 13,669.47
VAR RT 07/20/2034 DD 07/01/04
SEC ID: 36225DCB8
GENERAL ELEC CAP MTN#TR 00526 100.0460 2,500,000.000 2,502,460.00 2,501,150.00 0.57% -1,310.00
VAR RT 03/15/2005 DD 03/20/02
SEC ID:36962GXX7
GENERAL MTRS ACCEP CORP SR NT 104.3120 3,000,000.000 3,064,350.00 3,129,360.00 0.71% 65,010.00
6.125%08/28/2007 DD 08/29/02
SEC ID:370425SD3
GOLDMAN SACHS GRP MTN 100.1870 3,500,000.000 3,507,850.50 3,506,545.00 0.80% -1,305.50
#TROO194
VAR RT 10/27/2006 DD 10/29/03
SEC ID: 3814 1 EJI36
GOLDMAN SACHS GRP MTN 100.1560 800,000.000 800,000.00 801,248.00 0.18% 1,248.00
#TR00207
VAR RT 07/23/2009 DD 07/23/04
SEC ID: 3814 1&JQ3
GOLDMAN SACHS GROUP INC SR NT 102.2960 3,000,000.000 3,030,030.00 3,068,880.00 0.70% 38,850.00
4.125%01/15/2008 DD 01/13/03
SEC ID:38141GCS I
111812004 2:10:11 PM PST 9 Workbench
Asset Detail Report m: GL8013
Mellon Alternate Base Currency: IISD
by Currency Exchange Rate:
0CSDLC0NiS0I.1DATED-OCSGWO10000 10/31/2004 Status: Fn(AL
,.r, '�- P�. ,t +•:S.t.s ......, .,p:.a,a �#. ;✓h,t ii;.:. � .:.._. ,,yyj r• �.7�; r. -.i;i �i'L'�t�1i.'iut.b„1. .z?,.. '
.,1�Y, �... a\':.,../ -...je F F7•,'i<� 'r^d},K!„ l a y i.• ) a.�;' t� �� ET'.t"'a Ht.:, � 1 � �T''�Ilj.� <}
�..,'L`°.`' ..-' 3 ..,...f 1 ��`1k.f�"'• .: I,t�:ll � )_G..y�'" r "'i' •4•f.`> �'� �, ',����..t ,�C.;L J,. 2�k� 1.� �,HeU. _ali�e�<
-: _ `lj'di s'•'`�.•r�-�� - �. "P�w el"'. 17:.{.. ':irs'a'.,_
,Price
,. -x_.�.�_.c- ,,.ut`.. _s .. ��. .-.",),r� ._,•. . -__......cryc.,:y l.r�'f�uc• ..,�. - �.. ,,.tt
..Y r- ; ,_�. c'- 'Z,tt k ?:uZS... ." 'YF�e.Y r�'tt �. ? �n ;s!r.�^1 { `c4 1.y:f W] w.'ik"+ "x "ak.
Y. .'? N i� t 1 t tt, 1. �:.
�� ''� t 8 88 1':,.t f..::t '�88 >�" �-s }r . $ Se .3 <,p^ Bad
GNMA GTD REMIC TR 2000-9 FH 100.6620 528,130.190 528,130.19 531,626.41 0.12% 3,496.22
VAR RT 02/16/2030
SEC ID:3837H4NX9
KRAFT FOODS INC NT 99.9840 3,000,000.000 2,999,910.00 2,999,520.00 0.69% -390.00
VAR RT 11/26/2004 DD 11/26/02
SEC ID: 50075NAJ3
MORGAN STANLEY NT 100.5150 3,200,000.000 3,149,248.00 3,216,480.00 0.73% 67,232.00
3.875%01/15/2009 DD O1/13/04
SEC ID:61746BALO
RESIDENTIAL ASSET 03-RS11 AIIB 99.8125 744,359.220 744,359.22 742,963.55 0.17% -1,395.67
VAR RT 12/25/2033 DD 12/30/03
SEC ID: 760985K83
SBA GTD DEV PARTN 2001-20C 1 108.6850 2,985,923.500 2,985,923.50 3,245,250.96 0.74% 259,327.46
6.340%03/01/2021
SEC ID:83162CLJ0
SBA GTD PARTN CTFS SBIC-PS 01 108.8600 1,920,261.520 1,920,261.52 2,090,396.69 0.48% 170,135.17
6.640%02/10/2011 DD 02/21/01
SEC ID: 831641DD4
UNITED AIRLS PASSTHRU 0 1-1 C 7.9940 1,600,000.000 1,600,000.00 127,904.00 0.03% -1,472,096.00
6.831%03/01/2010 DD O8/22/01
SEC ID:909317BC2
U S TREASURY NOTES 108.0000 20,000,000.000 22,620,312.50 21,600,000.00 4.93% -1.020,312.50
06.250%02/15/2007 DD 02/15/97
SEC ID:9128272J0
US TREASURY INFLATION INDEX NT 107.1875 16,768,640.000 14,850,698.33 17,973,886.00 4.11% 3,123,187.67
3.375%01/15/2007 DD 01/15/97
SEC ID:9128272M3
US TREASURY INFLATION INDEX NT 110.3440 3,523,890.000 3,833,391.35 3,888,401.18 0.89% 55,009.83
3.625%0 1/15/2008 DD 01/15/98
SEC ID:9128273T7
US TREASURY INFLATION INDEX NT 113.5000 15,042,560.000 16,667,920.11 17,073,305.60 3.90% 405,385.49
3.875%01/15/2009 DD 01/15/99
SEC ID:9128274Y5
U S TREASURY NOTES 103.5940 3,900,000.000 4,288,149.14 4,040,166.00 0.92% -247,983.14
05.750% 11/15/2005 DD 11/15/00
SEC ID:9128276N7
U S TREASURY NOTES 101.0300 17,600,000.000 17,405,000.00 17,781,280.00 4.06% 376,280.00
3.375% 12/15/2008 DD 12/15/03
SEC ID:912828BT6
U S TREASURY NOTES 100.5200 27,500,000.000 27,463,468.63 27,643,000.00 6.32% 179,531.37
2.750%06/30/2006 DD 06/30/04
SEC ID:912828CM0
111812004 2:10.11PM pST 10 Workbench
Asset Detail Report ID: GL8013
@ Mellon Base Currency: USD
by CulTency Alternate Base Currency:
e Rate:
C 3OUDATED-0080000 10000 10131/2004 EzchangStatus: FINAL
i Km
g g,
k
pv
WNNet IIvsealizedr
IS! j -1
s
V..
Ddic'
U S TREASURY NOTES 100.5000 49,000,000.000 49,103,927.41 49,245,000.00 11.25% 141,072.59
2.750%07/31/2006 DD 07/31/04
SEC ID:912828CQI
US TREASURY NOTES 99.7900 55,300,000.000 55,048,031.25 55,183,870.00 12.61% 135,838.75
2.375%08/31/2006 DD 08/31/04
SEC ID:912828CU2
VIRGINIA ELEC&PWR 01 SERA 103.9840 1,750,000.000 1,743,840.00 1,819,720.00 0.42% 75,880.00
5.750%03/31/2006 DD 03/27/01
SEC ID:927804ENO
TOTAL FIXED INCOME SECURITIES 337,619,532.5I0 342,396,401.36 345,149,857.79 78.86% 2,753,456.43
TOTAL ASSETS U.S.DOLLAR 454,010,742.690 434,947,305.38 437,700,761.81 100.00% 2,753,456.43
TOTAL ASSETS-BASE: 454,010,742.690 434,947,305.38 437,700,761.81 100.00% 2,753,456.43
111812004 2:10.11PM PST 11 Workbench
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSZ)-CONSOLZDATED -OCSCTOOO 10000 10/1/2004 - 10/29/2004 Status: FINAL
Di'
PURCHASES
CASH&CASH EQUIVALENTS
U.S. DOLLAR
• FEDERAL HOME LN BK CONS DISC N MAT 10/22/2004 99.4982 3,200,000.000 3,183,943.56 -3,183,943.56 0.00
01/21/2005 10/22/2004
SEC ID:313385AW6 10/22/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
• FEDERAL HOME LN BK CONS DISC N MAT 10/26/2004 99.5215 1,000,000.000 995,215.00 -995,215.00 0.00
01/21/2005 10/26/2004
SEC ID:313385AW6 10/26/2004
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07511102:LIQUID OPER-PIMCO
• FEDERAL HOME LN MTG CORP DISC MAT 10/8/2004 99.5258 7,600,000.000 7,563,959.11 -7,563,959.11 0.00
01/04/2005 10/8/2004
SEC ID:313397AD3 10/8/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONGTERM OPER-PIMCO
• FEDERAL NATL MTG ASSN DISCOUNT MAT 10/7/2004 99.5050 9,900,000.000 9,850,995.00 -9,850,995.00 0.00
01/05/2005 10/7/2004
SEC ID:313589AE3 10/7/2004
BROKER: GOLDMAN SACHS&CO, NY
OCSF07522202:LONG TERM OPER-PIMCO
• FEDERAL NATL MTG ASSN DISC NT MAT 10/27/2004 99.4944 700,000.000 696,461.11 -696,461.11 0.00
01/26/2005 10/27/2004
SEC 11):31358913138 10/27/2004
BROKER: LEHMAN GOVr SECS INC, NY
OCSF07522202:LONGTERM OPER-PIMCO
• GENERAL ELEC CAP DISC 02/04/2005 10/7/2004 99.3200 9,900,000.000 9,832,680.00 -9,832,680.00 0.00
SEC ID:36959HP43 10/7/2004
BROKER. CITIBANK CP IPA,NEW YORK 10/7/2004
OCSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
Transaction Detail Report W: EWB009
IV aon Reported by Transaction Category Base Currency, USD
OCSD-CONSOLI DATE DM12000 Doom= 10/1/2004 - 10/29/2004 Status: FINAL
M
:0
r.
® A
,r 1
NSN z
• WELLS FARGO 13K NA INSTL C/D 1.900% 10/12/2004 100.0000 1,100,000.000 1,100,000.00 -1,100,000.00 0.00
12/15/2004 DD 10/14/04 10/14/2004
SEC ID:9497PlJEO 10/12/2004
BROKER: BANC OF AMERICA SEC LLC,SAN
FRANCISCO
OCSF07511102:LIQUID OPER-PIMCO
• WELLS FARGO BANK NA INSTL C/D 1.860% 10/6/2004 100.0000 300,000.000 300,000.00 -300,000.00 0.00
12/06/2004 DD 10/08/04 10/8/2004
SEC ID:9497PILQO 10/6/2004
BROKER: BANC OF AMERICA SEC LLC,SAN
FRANCISCO
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.710%10/05/2004 DD 10/4/2004 100.0000 2,100,000.000 2,100,000.00 -2,100,000.00 0.00
10/04/04 10/4/2004
SEC ID:99426D349 10/4/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN BROTHERS REPO 0 1.700% 10/5/2004 100.0000 2,100,000.000 2,100,000.00 -2,100,000.00 0.00
10/06/2004 DD 10/05/04 10/5/2004
SEC ID:99426E438 10/5/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.710%10/07/2004 DD 10/6/2004 100.0000 2,100,000.000 2,100,000.00 -2,100,000.00 0.00
10/06/04 10/6/2004
SEC ID:99426F963 10/6/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• CREDIT SUISSE FB REPO 01.700%10/07/2004 10/6/2004 100.0000 18,200,000.000 18,200,000.00 -18,200,000.00 0.00
DD 10/06/04 10/6/2004
SEC ID:99426F971 10/6/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONGTERM OPER-PIMCO
• CREDIT SUISSE FB REPO 0 1.700%10/08/2004 10/7/2004 100.0000 2,800,000.000 2,800,000.00 -2,800,000.00 0.00
DD 10/07/04 10/7/2004
SEC ID:99426H258 10/7/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONG TERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
2 1
Transaction Detail Report ID: EWB009'
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D=2 0 00 00000-DOO 10/1/2004 - 10/29/2004 Status: FINAL
ry�
A
"
-gk
: ffi
i;u�P -� P § tApzkdiiU 6`N -
rffi-", ,TY,1�r�:P�e��c�zP�_:::.._;��' :, •���-���.,:&�r,. .� !��'�,i,:,..P.. ._-.:.,:�..�_•�.,�.. `� ..i�._. "g ��_�-:f�.:�k.�- ..,:. � �n...:�.; ��n:,� ,.,. .T�.r... .,. '�:_ IL
• LEHMAN CAT 2 REPO 0 1.730%10/08/2004 DD 10/7/2004 100.0000 3,300,000.000 3,300,000.00 -3,300,000.00 0.00
10/07/04 10/7/2004
SEC ID:994261-1282 10/7/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.680%10/12/2004 DD 10/8/2004 100.0000 3,000,000.000 3,000,000.00 -3,000,000.00 0.00
10/08/04 10/8/2004
SEC ID:99426J684 10/8/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• CREDIT SUISSE FB REPO 0 1.700%10/13/2004 10/12/2004 100.0000 3,000,000.000 3,000,000.00 -3,000,000.00 0.00
DD 10/12/04 10/12/2004
SEC ID:99426L143 10/12/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 01.720%10/14/2004 DD 10/13/2004 100.0000 1,900,000.000 1,900,000.00 -1,900,000.00 0.00
10/13/04 10/13/2004
SEC ID:99426M489 10/13/2004
BROKER LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.730%10/15/2004 DD 10/14/2004 100.0000 1,900,000.000 1,900,000.00 -1,900,000.00 0.00
10/14/04 10/14/2004
SEC ID:99426N784 10/14/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.770%10/18/2004 DD 10/15/2004 100.0000 3,400,000.000 3,400,000.00 -3,400,000.00 0.00
10/15/04 10/15/2004
SEC ID:99426Q316 10/15/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.720%10/19/2004 DD 10/18/2004 100.0000 3,400,000.000 3,400,000.00 -3,400,000.00 0.00
10/18/04 10/18/2004
SEC ID:99426RS95 10/18/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
111812004 2:12:30PM PST Workbench
3
Transaction Detail Report M: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D=0 00 00000000 10/1/2004 - 10/29/2004 Status: FINAL
d YP.Atbill
• LEHMAN CAT 2 REPO 01.710%10/20/2004 DD 10/19/2004 100.0000 3,500,000.000 3,500,000.00 -3,500,000.00 0.00
10/19/04 10/19/2004
SEC ID:99426TO96 10/19/2004
BROKER LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.680%10/21/2004 DD 10/20/2004 100.0000 3,500,000.000 3,500,000.00 -3,500,000.00 0.00
10/20/04 10/20/2004
SEC ID:99426U523 10/20/2004
BROKER LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.710%10/22/2004 DD 10/21/2004 100.0000 3,500,000.000 3,500,000.00 -3,500,000.00 0.00
10/21/04 10/21/2004
SEC ID:99426VB85 10/21/2004
BROKER. LEHMAN GOVT SECS INC,NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN BROTHERS REPO 0 1.700% 10/22/2004 100.0000 3,500,000.000 3,500,000.00 -3,500,000.00 0.00
10/25/2004 DD 10/22/04 10/22/2004
SEC ID:99426X287 10/22/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• CREDIT SUISSE FB REPO 0 1.700%10/26/2004 10/25/2004 100.0000 3,500,000.000 3,500,000.00 -3,500,000.00 0.00
DD 10/25/04 10/25/2004
SEC ID:99426Y814 10/25/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.680%10/27/2004 DD 10/26/2004 100.0000 2,500,000.000 2,500,000.00 -2,500,000.00 0.00
10/26/04 10/26/2004
SEC ID:99427AI 12 10/26/2004
BROKER LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
• LEHMAN CAT 2 REPO 0 1.710%10/28/2004 DD 10/27/2004 100.0000 2,500,000.000 2,500,000.00 -2,500,000.00 0.00
10/27/04 10/27/2004
SEC ID:99427B888 10/27/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
111812004 2:12:30PM PST Workbench
4
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currencyy
: USDSD
OCSD-CONSOLIDATE D=0 DO 00000000 10/1/2004 - 10/29/2004 Status: FINAL
i T-M
4,
E�� �' �' u,» ��•a tr•,-,,.r };�';� r: �.f,.s„ `e ''f 3'= ,h..'r'k;� s� t -:!�,i�. � r-.�- ��, .ct a ,. �, 'G`N' a3.;�� :::� �'.:I:
B LEHMAN CAT 2 REPO 0 1.740%10/29/2004 DD 10/28/2004 100.0000 2,500,000.000 2,500,000.00 -2,500,000.00 0.00
10/28/04 10/28/2004
SEC ID:99427DO09 10/28/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
B DREYFUS TREASURY CASH MGMT 10/1/2004 1.0000 19,997.580 19,997.58 -19,997.58 0.00
SEC ID:996085247 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/1/2004
B DREYFUS TREASURY CASH MGMT 10/4/2004 1.0000 103,422.220 103,422.22 -103,422.22 0.00
SEC ID:996085247 10/4/2004
OCSF07511102:LIQUID OPER-PIMCO 10/4/2004
B DREYFUS TREASURY CASH MGMT 10/5/2004 1.0000 1,252.030 1,252.03 -1,252.03 0.00
SEC ID:996085247 10/5/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/5/2004
B DREYFUS TREASURY CASH MGMT 10/5/2004 1.0000 3,002.280 3,002.28 -3,002.28 0.00
SEC ID:996085247 10/5/2004
OCSF07511102:LIQUID OPER-PIMCO 10/5/2004
B DREYFUS TREASURY CASH MGMT 10/6/2004 1.0000 99.170 99.17 -99.17 0.00
SEC ID:996085247 10/6/2004
OCSF07511102:LIQUID OPER-PIMCO 10/6/2004
B DREYFUS TREASURY CASH MGMT 10/7/2004 1.0000 89,138.860 89.138.86 -89,138.86 0.00
SEC ID:996085247 10/7/2004
OCSF07522202:LONG TERM OPER-PIMCO 10/7/2004
B DREYFUS TREASURY CASH MGMT 10/8/2004 1.0000 3,000,158.580 3,000,158.58 -3,000,158.58 0.00
SEC ID:996085247 10/8/2004
OCSF07511102:LIQUID OPER-PIMCO 10/8/2004
B DREYFUS TREASURY CASH MGMT 10/13/2004 1.0000 1,100,141.670 1,100,141.67 -1,100,141.67 0.00
SEC ID:996085247 10/13/2004
OCSF07511102:LIQUID OPER-PIMCO 10/13/2004
111812004 2:12:30PM PST Workbench
5
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATEDM[20 00 DOD00000 10/1/2004 - 10/29/2004 Status: FINAL
E
FIT"
A, w---y
B DREYFUS TREASURY CASH MGMT 10/14/2004 1.0000 15,703.120 15,703.12 -15,703.12 0.00
SEC ID:996085247 10/14/2004
OCSF07522202:LONG TERM OPER-PIMCO 10/14/2004
B DREYFUS TREASURY CASH MGMT 10/15/2004 1.0000 128,247.560 128,247.56 -128,247.56 0.00
SEC ID:996085247 10/15/2004
OCSF07511102:LIQUID OPER-PIMCO 10/15/2004
B DREYFUS TREASURY CASH MGMT 10/18/2004 1.0000 14,537.990 14,537.99 -14,537.99 0.00
SEC ID:996085247 10/18/2004
OCSF07522202:LONG TERM OPER-PIMCO 10/18/2004
B DREYFUS TREASURY CASH MGMT 10/18/2004 1.0000 501.500 501.50 -501.50 0.00
SEC ID:996085247 10/18/2004
OCSF07511102:LIQUID OPER-PIMCO 10/18/2004
B DREYFUS TREASURY CASH MGMT 10/19/2004 1.0000 76,484.360 76,484.36 -76,484.36 0.00
SEC ID:996085247 10/19/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/19/2004
B DREYFUS TREASURY CASH MGMT 10/20/2004 1.0000 166.250 166.25 -166.25 0.00
SEC ID:996085247 10/20/2004
OCSF07511102:LIQUID OPER-PIMCO 10/20/2004
B DREYFUS TREASURY CASH MGMT 10/20/2004 1.0000 94,672.060 94,672.06 -94,672.06 0.00
SEC ID:996085247 10/20/2004
OCSF07522202:LONG TERM OPER-PIMCO 10/20/2004
B DREYFUS TREASURY CASH MGMT 10/21/2004 1.0000 163.330 163.33 -163.33 0.00
SEC ID:996085247 10/21/2004
OCSF07511102:LIQUID OPER-PIMCO 10/21/2004
B DREYFUS TREASURY CASH MGMT 10/22/2004 1.0000 166.250 166.25 -166.25 0.00
SEC ID:996085247 10/22/2004
OCSF07511102:LIQUID OPER-PIMCO 10/22/2004
B DREYFUS TREASURY CASH MGMT 10/25/2004 1.0000 495.830 495.83 -495.83 0.00
SEC ID:996085247 10/25/2004
OCSF07511102:LIQUID OPER-PIMCO 10/25/2004
111812004 2:12:30PM PST Workbench
6
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D-MI211710 000011000 10/1/2004 - 10/29/2004 Status: FINAL
T-
• DREYFUS TREASURY CASH MGMT 10/25/2004 1.0000 713,111.330 713,111.33 -713,111.33 0.00
SEC ID:996085247 10/25/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/25/2004
• DREYFUS TREASURY CASH MGMT 10/26/2004 1.0000 4,950.280 4,950.28 -4,950.28 0.00
SEC ID:996085247 10/26/2004
OCSF07511102:LIQUID OPER-PIMCO 10/26/2004
• DREYFUS TREASURY CASH MGMT 10/27/2004 1.0000 116.670 116.67 -116.67 0.00
SEC ID:996085247 10/27/2004
OCSF07511102:LIQUID OPER-PIMCO 10/27/2004
• DREYFUS TREASURY CASH MGMT 10/28/2004 1.0000 6,692.080 6,692.08 -6,692.08 0.00
SEC ID:996085247 10/28/2004
OC SF0752 2202:LONGTERM OPER-PIMCO 10/28/2004
• DREYFUS TREASURY CASH MGMT 10/28/2004 1.0000 118.750 118.75 -118.75 0.00
SEC ID:996085247 10/28/2004
OCSF07511102:LIQUID OPER-PIMCO 10/28/2004
• DREYFUS TREASURY CASH MGMT 10/29/2004 1.0000 2,499,050.830 2,499,050.83 -2,499,050.83 0.00
SEC ID:996085247 10/29/2004
OCSF07511102:LIQUID OPER-PIMCO 10/29/2004
TOTAL CASH&CASH EQUIVALENTS U.S. DOLLAR: 113,772,390.580 113,595,644.36 -113,595,644.36 0.00
TOTAL CASH&CASH EQUIVALENTS BASE: 113,772,390.580 113,595,644.36 -113,595,644.36 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
• COMMIT TO PUR FNMA SF MTG 5.000% 10/15/2004 101.8438 22,000,000.000 22,405,625.00 -22,405,625.00 0.00
11/01/2019 DD 11/01/04 11/18/2004
SEC ID:01170504139 10/15/2004
BROKER: UBS SECURITIES LLC, NEW YORK
OCSF0752 2202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
7
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCS D-CONSOLI DATE DME211001113000 0110 10/1/2004 - 10/29/2004 Status: FINAL
ily
• COMMIT TO PUR FNMA SF MTO 5.500% 10/12/2004 101.5000 3,000,000.000 3,045,000.00 -3,045,000.00 0.00
11/01/2034 DD 11/01/04 11/15/2004
SEC ID:0IF0526133 10/12/2004
BROKER: GOLDMAN SACHS&CO, NY
OCSF07522202:LONGTERM OPER-PIMCO
• COMMIT TO PUR FNMA SF MTG 5.500% 10/12/2004 101.4375 1,000,000.000 1,014,375.00 -1,014,375.00 0.00
11/01/2034 DD 11/01/04 11/15/2004
SEC ID:01F0526133 10/12/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07522202:LONGTERM OPER-PIMCO
• CIT GROUP INC NEW SR NT VAR RT 10/12/2004 100.4670 1,500,000.000 1,507,005.00 -1,507,005.00 0.00
09/22/2006 DD 09/23/03 10/15/2004
SEC ID: 125581AF5 10/12/2004
BROKER: BARCLAYS CAPITAL INC,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
IB C IT GROUP INC NEW SR NT VAR RT 10/12/2004 100.4670 0.000 0.00 -2,222.14 0.00
09122/2006 DD 09/23/03 10/15/2004
SEC ID: 125581AFS 10/12/2004
BROKER: BARCLAYS CAPITAL INC,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
B GOLDMAN SACHS GRP MTN#TR00 194 VAR RT 10/12/2004 100.2243 3,500,000.000 3,507,850.50 -3,507,850.50 0.00
10/27/2006 DD 10/29/03 10/15/2004
SEC ID:38141 EJB6 10/12/2004
BROKER: BANC OF AMERICA SEC LLC,SAN
FRANCISCO
OCSF07522202:LONG TERM OPER-PIMCO
IB GOLDMAN SACHS GRP MTN#TR00194 VAR RT 10/12/2004 100.2243 0.000 0.00 -14,233.33 0.00
10/27/2006 DD 10/29/03 10/15/2004
SEC ID:38141EJB6 10/12/2004
BROKER: BANC OF AMERICA SEC LLC,SAN
FRANCISCO
OCSF07522202:LONGTERM OPER-PEMCO
B U S TREASURY NOTES 2.750%07/31/2006 DD 10/6/2004 100,3370 28,300,000.000 28,395,371.00 -28,395,371.00 0.00
07/31/04 10/8/2004
SEC ID:912828CQI 10/6/2004
BROKER: BEAR STEARNS&CO INC,NY
OCSF07522202:LONG TERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
8
Transaction Detail Report ID: EWB009
! Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED02000000000❑0 10/1/2004 - 10/29/2004 Status: FINAL
F" E•S''. ,t'.. s-c:. :n xts�'r. ,. '{ -•byyyy--.k.. >•-;y r F. �. '`a �. s� k m.'s.t'$ k-i :.6A
.z,�•`'. J:..$:Y -.6 -fF ,C�. :"{:� [-t°�`"'F' ..'Sw "'h; ? 'i'''�:. , .��, ..�`'.u.. ,u'�?t :.c.��....,_. 1 rfG;us'w ;'&t^ti+`c�. ..w,.
---r -r �,� .�� -y. .=yam.#. 'i- �- - c?- �s - '•3 1 :,� m.:.:.4 r. ,�i_ wc, .F F•: � s.#�`, - J'd�."yt<' .� {,. •w.
-r_. :..A.t'S... ;y etT3 ;:�- a?a ',.�,+. . . _ .. � •{{ y_,. *'�. 3ru - F 1.4 ^•.y Jr. _ '. ..t'<::'..
tiiW2ila
`:��: .,:�� .�"'�'�t'M$;:"ti,. �`��_ •�nAc�' v���� �e ,.k�� - •t?', '�.T `��a*,. ��� W t. aF"�c,.,.. 1 .•
e..• ,t..:''"�� .'i a"k...rc3,e•t _.r s -ri',. j �..-_a.;: �I ,,. .4 .,r n? `,_ :{..; �. 2:-:.. '2%7'-y,r.4 r.�z ,. v kr
< :'�4,..• ., 3'*�, C .sir;...; . : - P . .�.�;`.s ��rk.,.e .€ ��,��-'� .,�i-,—.}�,. ,f;�'c, ";��' �,.t+.r .'` �, s u"�u� �, �z�._ � ,. x.t
4 F v.
IB U S TREASURY NOTES 2.750%07/31/2006 DD 10/6/2004 100.3370 0.000 0.00 -145,921.88 0.00
07 31 04
SEC ID:912828CQI 10/8/2004
BROKER: BEAR STEARNS&CO INC,NY 10/6/2004
OCSF07522202:LONG TERM OPER-PIMCO
B US TREASURY NOTES 2.375%08/31/2006 DD 10/5/2004 99.5391 42,800,000.000 42,602,718.75 -42,602,718.75 0.00
08/31/04 10/6/2004
SEC ID:912828CU2 10/5/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07522202:LONGTERM OPER-PIMCO
IB US TREASURY NOTES 2.375%08/31/2006 DD 10/5/2004 99.5391 0.000 0.00 -101,088.40 0.00
08/31/04 10/6/2004
SEC ID:912828CU2 10/5/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07522202:LONGTERM OPER-PIMCO
B US TREASURY NOTES 2.3750/.08/31/2006 DD 10/6/2004 99.5625 12,500,000,000 12,445,312.50 -12,445,312.50 0.00
08/31/04 10/7/2004
SEC ID:912828CU2 10/6/2004
BROKER: BEAR STEARNS&CO INC,NY
OCSF07522202:LONG TERM OPER-PIMCO
IB US TREASURY NOTES 2.375%08/31/2006 DD 10/6/2004 99.5625 0.000 0.00 -30,343.58 0.00
08/31/04 10/7/2004
SEC ID:912828CU2 10/6/2004
BROKER: BEAR STEARNS&CO INC,NY
OCSF07522202:LONGTERM OPER-PIMCO
TOTAL FIXED INCOME SECURITIES U.S.DOLLAR 114,600,000.000 114,923,257.75 -115,217,067.08 0.00
TOTAL FIXED INCOME SECURITIES BASE: 114,600,000.000 114,923,257.75 -115,217,067.08 0.00
TOTAL PURCHASES BASE: 228,372,390.580 228,518,902.11 -228,812,711.44 0.00
PAY UPS
FIXED INCOME SECURITIES
U.S. DOLLAR
111812004 2:12:30PM PST Workbench
9
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATE DO=0 00 00D00000 10/1/2004 - 10/29/2004 Status: FINAL
ilk
him
41.d Mat
p"ft. "
Jd
t f Ne�C#i��L�B
I L
m VA w3 * 1 PU US TREASURY INFLATION INDEX NT 3.375% 7/15/2004 100.0000 7,700.000 7,700.00 -7,700.00 0.00
01/15/2007 DD 01/15/97 7/15/2004
SEC ID:9128272M3 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PU US TREASURY INFLATION INDEX NT 3.625% 7/15/2004 100.0000 1,620.000 1,620.00 -1,620.00 0.00
01/15/2008 DD 01/15/98 7/15/2004
SEC ID:9128273T7 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PU US TREASURY INFLATION INDEX NT 3.875% 7/15/2004 100.0000 6,890.000 6,890.00 -6,890.00 0.00
01/15/2009 DD 0 1/15/99 7/15/2004
SEC ID:9128274Y5 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
TOTAL FIXED INCOME SECURITIES U.S.DOLLAR: 16,210.000 16,210.00 .16,210.00 0.00
TOTAL FIXED INCOME SECURITIES BASE: 16,210.000 16,210.00 -16,210.00 0.00
TOTAL PAY UPS BASE: 16,210.000 16,210.00 -16,210.00 0.00
SALES
CASH&CASH EQUIVALENTS
U.S. DOLLAR
S FEDERAL HOME LN BK CONS DISC 10/1/2004 99.6006 -700,000.000 -697,204.28 697,204.28 0.00
SEC ID:313384P37 10/1/2004
BROKER: LEHMAN GOUT SECS INC, NY 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
IS FEDERAL HOME LN BK CONS DISC 10/1/2004 99.6006 0.000 0.00 1,407.39 0.00
SEC ID:313384P37 10/1/2004
BROKER: LEHMAN GOUT SECS INC, NY 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
10 1
Transaction Detail Report ID: EWBO09'
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE DaU20 00 00DOC1000 10/1/2004 - 10/29/2004 Status: FINAL
S
co
V
S FEDERAL HOME LN BK CONS DISC N MAT 10/1/2004 99.5576 -2,800,000.000 -2,787,613.89 2,787,613.89 0.00
12/08/2004 10/1/2004
SEC ID:313384S59 10/1/2004
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202:LONGTERM OPER-PIMCO
IS FEDERAL HOME LN BK CONS DISC N MAT 10/1/2004 99.5576 0.000 0.00 3,024.78 0.00
12/08/2004 10/1/2004
SEC ID:313384S59 10/1/2004
BROKER:MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202:LONG TERM OPER-PIMCO
S FEDERAL HOME LN BK CONS DISC N MAT 10/15/2004 99.5576 -800,000.000 -796,461.11 796,461.11 0.00
12/08/2004 10/15/2004
SEC ID:313384S59 10/15/2004
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202:LONG TERM OPER-PIMCO
Is FEDERAL HOME LN BK CONS DISC N MAT 10/15/2004 99.5576 0.000 0.00 1,510.89 0.00
12/08/2004 10/15/2004
SEC ID:313384S59 10/15/2004
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202:LONGTERM OPER-PIMCO
S FEDERAL HOME LN MTG CORP DISC MAT 10/1/2004 99.4461 -400,000.000 -397,784.56 397,784.56 0.00
11/24/2004 10/1/2004
SEC ID:313396Q71 10/1/2004
BROKER: MORGAN STANLEY&CO INC, NY
OCSF07522202:LONG TERM OPER-PIMCO
IS FEDERAL HOME LN MTG CORP DISC MAT 10/1/2004 99.4461 0.000 0.00 1,219.44 0.00
11/24/2004 10/1/2004
SEC ID:313396Q71 10/1/2004
BROKER: MORGAN STANLEY&CO INC, NY
OCSF07522202:LONG TERM OPER-PIMCO
S FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.7663 -700,000.000 -698,364.14 698,364.14 0.00
11/15/2004 10/1/2004
SEC ID:313588P66 10/1/2004
BROKER:CHASE SECURITIES,NEW YORK
OCSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
Transaction Detail Report ED: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATE DL-=000 00000000 10/1/2004 - 10/29/2004 Status: FERAL
sllmd*—AM tt
e
IS FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.7663 0.000 0.00 135.23 0.00
11/15/20G4 10/1/2004
SEC ID:313588P66 10/1/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.6040 -5,400,000.000 -5,378,617.50 5,378,617.50 0.00
11/17/2004 10/1/2004
SEC ID:313588P82
BROKER:CHASE SECURITIES,NEW YORK 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
IS FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.6040 0.000 0.00 9,186.00 0.00
11/17/2004 10/1/2004
SEC ID:313588P82 10/1/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
S FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.5804 -800,000.000 -796,643.11 796,643.11 0.00
11/24/2004 10/1/2004
SEC ID:313588Q73 10/1/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONGTERM OPER-PIMCO
IS FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99,5804 0.000 0.00 1,280.89 0.00
11/24/2004 10/1/2004
SEC ID:313588Q73 10/1/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
S FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.6650 -1,100,000.000 -1,096,315.00 1,096,315.00 0.00
11/29/2004 10/1/2004
SEC ID:313588R49 10/1/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
IS FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.6650 0.000 0.00 512.11 0.00
11/29/2004 10/1/2004
SEC ID:313588R49 10/1/2004
BROKER:CHASE SECURITIES,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
12 1
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE DMIM000 0DODDOOD 10/1/2004 - 10/29/2004 Status: FINAL
N
%0
g
Y.5-..
;.09
P41 U in�Ni IN OR I M,
.34"S
S FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.5909 -4,000,000.000 -3,983,636.61 3,983,636.61 0.00
12/01/2004 10/1/2004
SEC ID:313588R64 10/1/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONGTERM OPER-PIMCO
IS FEDERAL NATL MTG ASSN DISCOUNT MAT 10/1/2004 99.5909 0.000 0.00 4,298.95 0.00
12/01/2004 10/1/2004
SEC ID:313588R64 10/1/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONGTERM OPER-PIMCO
S FEDERAL NATL MTG ASSN DISCOUNT MAT 10/15/2004 99.5551 -200,000.000 -199,110.22 199,110.22 0.00
12/08/2004 10/15/2004
SEC ID:313588S55 10/15/2004
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202:LONGTERM OPER-PIMCO
IS FEDERAL NATL MTG ASSN DISCOUNT MAT 10/15/2004 99.5551 0.000 0.00 382.78 0.00
12/08/2004 10/15/2004
SEC ID:313588SSS 10/15/2004
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202:LONG TERM OPER-PIMCO
S FEDERAL NATL MTG ASSN DISC NTS MAT 10/15/2004 99.5676 -400,000.000 -398,270.44 398,270.44 0.00
12/15/2004 10/15/2004
SEC ID-.31358BT47 10/15/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONGTERM OPER-PIMCO
IS FEDERAL NATL MTG ASSN DISC NTS MAT 10/15/2004 99.5676 0.000 0.00 509.56 0.00
12/15/2004 10/15/2004
SEC ID:313588T47 10/15/2004
BROKER: CHASE SECURITIES,NEW YORK
OCSF07522202:LONGTERM OPER-PIMCO
S FEDERAL NATL MTG ASSN DISCOUNT MAT 10/15/2004 99.5324 -3,600,000.000 -3,583,165.00 3,583,165.00 0.00
12/22/2004 10/15/2004
SEC ID:313588U37 10/15/2004
BROKER. CHASE SECURITIES,NEW YORK
OCSF07522202:LONG TERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
13
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
-OCSDC ONSOLI DATE D=2 0 00 uo[i0000ci 10/1/2004 - 10/29/2004 Status: FINAL
'1111 1 4111",1 vir-11
IS FEDERAL NATL MTG ASSN DISCOUNT MAT 10/15/2004 99.5324 0.000 0.00 4,459.00 0.00
12/22/2004 10/15/2004
SEC ID:313588U37
BROKER: CHASE SECURITIES,NEW YORK 10/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
S LEHMAN CAT 2 REPO 01.710%10/05/2004 DD 10/5/2004 100.0000 -2,100,000.000 -2,100,000.00 2,100,000.00 0.00
10/04/04 10/5/2004
SEC ID:99426D349 10/5/2004
BROKER. LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 0 1.710%10/05/2004 DD 10/5/2004 100.0000 0.000 0.00 99.75 0.00
10/04/04 10/5/2004
SEC ID:99426D349 10/5/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN BROTHERS REPO 0 1.700% 10/6/2004 100.0000 -2,100,000.000 -2,100,000.00 2,100,000.00 0.00
10/06/2004 DD 10/05/04 10/6/2004
SEC ID:99426E438 10/6/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN BROTHERS REPO 0 1.700% 10/6/2004 100.0000 0.000 0.00 99.17 0.00
10/06/2004 DD 10/05/04 10/6/2004
SEC ID:9942613438 10/6/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 0 1.710%10/07/2004 DD 10/7/2004 100.0000 -2,100,000.000 -2,100,000.00 2,100,000.00 0.00
10/06/04 10/7/2004
SEC ID:99426F963 10/7/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 0 1.710%10/07/2004 DD 10/7/2004 100.0000 0.000 0.00 99.75 0.00
10/06/04 10/7/2004
SEC ID:9942617963 10/7/2004
BROKER; LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
111812004 2:12:30PM PST Workbench
14 1
Transaction Detail Report M: EWBO09'
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D=D 00 00DC0000 10/1/2004 - 10/29/2004 Status: FINAL
TOO,el
7rf�Mv- &
N-P MR RED-
IX�
Vxi
�1 71
7�, 'ig
1 r n a 4 1
S CREDIT SUISSE FB REPO 01.700%10/07/2004 10/7/2004 100.0000 -18,200,000.000 -18,200,000.00 18,200,000.00 0.00
DD 10/06/04 10/7/2004
SEC ID:99426F971 10/7/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONG TERM OPER-PIMCO
IS CREDIT SUISSE FB REPO 01.700%10/07/2004 10/7/2004 100.0000 0.000 0.00 859.44 0.00
DD 10/06/04 10/7/2004
SEC ID:99426F971 10/7/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONG TERM OPER-PIMCO
S CREDIT SUISSE FB REPO 01.700%10/08/2004 10/8/2004 100.0000 -2,800,000.000 -2,800,000.00 2,800,000.00 0.00
DD 10/07/04 10/8/2004
SEC ID:994261-1258 10/8/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONG TERM OPER-PIMCO
IS CREDIT SUISSE FB REPO 01.700%10/08/2004 10/8/2004 100.0000 0.000 0.00 132.22 0.00
DD 10/07/04 10/8/2004
SEC ID:99426H258 10/8/2004
BROKER. CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONGTERM OPER-PIMCO
S LEHMAN CAT 2 REPO 0 1.730%10/08/2004 DD 10/8/2004 100.0000 -3,300,000.000 -3,300.000.00 3,300,000.00 0.00
10/07/04 10/8/2004
SEC ID:9942614282 10/8/2004
BROKER- LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 0 1.730%10/08/2004 DD 10/8/2004 100.0000 0.000 0.00 158.58 0.00
10/07/04 10/8/2004
SEC ID-.99426H282 10/8/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
111812004 2:12:30PM PST Workbench
15
Transaction Detail Report m: EWB009
/ Mellon Reported by Transaction Category Base Currency: USn
OCSD-CONSOLIDATED000❑0❑❑❑❑❑❑ 10/1/2004 - 10/29/2004 Status: FINAL
M - _
ILmoi�,.,..L3''.;;,.,,,'rv;Dt. ``.I`.�•i..�{np`r a�S�`�-�i",b��dPFr..`..r�lir•.t�= d i
� �3�r r �J�,,,"..,,a•• ��}ecs 'x-ir7 c_,ti::a,s,x:e 3 w4fs,..5•.��#�z E�,'a�.=F'T »u r,. uz.-y:�{`i;•tt i_.` t.u'rS1{: s-iW:..i•:vs c +n.. 3+�'ti,.9�t:'sw<-tnti•'-i fa'�;+. �..r;r�ra��; "sI�..�z +,e t� <.
:
S LEHMAN CAT 2 REPO 01,680%10/12/2004 DD 10/12/2004 100.0000 -3,000,000.000 -3,000,000.00 3,000,000.00 0.00
10/08/04 10/12/2004
SEC ID:99426J684 10/12/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 01.680%10/12/2004 DD 10/12/2004 100.0000 0.000 0.00 560.00 0.00
10/08/04 10/12/2004
SEC ID:99426J684 10/12/2004
BROKER: LEHMAN GOUT SECS INC,NY
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 01.7000/6 10/13/2004 10/13/2004 100.0000 -3,000,000.000 -3,000,000.00 3,000,000.00 0.00
DD 10/12/04 10/13/2004
SEC ID:99426L143 10/13/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 01.7000/6 10/13/2004 10/13/2004 100.0000 0.000 0.00 141.67 0.00
DD 10/12/04 10/13/2004
SEC ID:99426LI43 10/13/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 01.720%10/14/2004 DD 10/14/2004 100.0000 -1,900,000.000 -1,900,000.00 1,900,000.00 0.00
10/13/04 10/14/2004
SEC ID:99426M489 10/14/2004
BROKER:LEHMAN GOUT SECS INC,NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 01.720%10/14/2004 DD 10/14/2004 100,0000 0.000 0.00 90.78 0.00
10/13/04 10/14/2004
SEC ID:99426M489 10/14/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 01.730%10/15/2004 DD 10/15/2004 100.0000 -1,900,000.000 -1,900,000.00 1,900,000.00 0.00
10/14/04 10/15/2004
SEC ID:99426N784 10/15/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
11/8/2004 2:12:30PM PST
Workbench
16
Transaction Detail Report ID: EWB009'
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED=2 D 00 0D000000 10/1/2004 - 10/29/2004 Status: FINAL
an:! 11a
w
v
Y D666*lpft
A 1'0
IS LEHMAN CAT 2 REPO 0 1.730%10/15/2004 DD 10/15/2004 100.0000 0.000 0.00 91.31 0.00
10/14/04 10/15/2004
SEC ID:99426N784 10/15/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 0 1.770%10/18/2004 DD 10/18/2004 100.0000 -3,400,000.000 -3,400,000.00 3,400,000.00 0.00
10/15/04 10/18/2004
SEC ID:99426Q316 10/18/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 0 1.770%10/18/2004 DD 10/18/2004 100.0000 0.000 0.00 501.50 0.00
10/15/04 10/18/2004
SEC ID:99426Q316 10/18/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 0 1.720%10/19/2004 DD 10/19/2004 100.0000 -3,400,000.000 -3,400,000.00 3,400,000.00 0.00
10/18/04 10/19/2004
SEC ID:99426R595 10/19/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 0 1.720%10/19/2004 DD 10/19/2004 100.0000 0.000 0.00 162.44 0.00
10/18/04 10/19/2004
SEC ID:99426R595 10/19/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 0 1.710%10/20/2004 DD 10/20/2004 100.0000 -3,500,000.000 -3,500,000.00 3,500,000.00 0.00
10/19/04 10/20/2004
SEC ID:99426TO96 10/20/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 0 1.710%10/20/2004 DD 10/20/2004 100.0000 0.000 0.00 166.25 0.00
10/19/04 10/20/2004
SEC ID:99426T1096 10/20/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
111812004 2:12:30PM PST Workbench
17
Transaction Detail Report ID: EWB009
rMellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D❑![r2DF100❑❑❑❑❑❑❑ 10/1/2004 - 10/29/2004 Status: FINAL,
Trade Date
Tran Settle Date ice Cost Amount Net Gain/Loss
Type Description Reported Date Base Shares/Par Base Base Base
S LEHMAN CAT 2 REPO 01.680%10/21/2004 DD 10/21/2004 100.0000 -3,500,000.000 -3,500,000.00 3,500,000.00 0.00
10/20/04 10/21/2004
SEC ID:99426U523 10/21/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF0751 1102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 01.680%10/21/2004 DD 10/21/2004 100.0000 0.000 0.00 163.33 0.00
10/20/04 10/21/2004
SEC ID:99426U523 10/21/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF0751 1102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 01.710%10/22/2004 DD 10/22/2004 100.0000 -3,500,000.000 -3,500,000.00 3,500,000.00 0.00
10/21/04 10/22/2004
SEC ID:99426V885
BROKER: LEHMAN GOVT SECS INC, NY 10/22/2004
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 01.710%10/22/2004 DD 10/22/2004 100.0000 0.000 0.00 166.25 0.00
10/21/04 10/22/2004
SEC ID:99426V885
BROKER: LEHMAN GOVT SECS INC, NY 10/22/2004
OCSF0751 1102:LIQUID OPER-PIMCO
S LEHMAN BROTHERS REPO 01.700% 10/25/2004 100.0000 -3,500,000.000 -3,500,000.00 3,500,000.00 0.00
10/25/2004 DD 10/22/04 10/25/2004
SEC ID:99426X287
BROKER: LEHMAN GOVT SECS INC, NY 10/25/2004
OCSF0751 1102:LIQUID OPER-PIMCO
IS LEHMAN BROTHERS REPO 01.700% 10/25/2004 100.0000 0.000 0.00 495.83 0.00
10/25/2004 DD 10/22/04 10/25/2004
SEC ID:99426X287
BROKER: LEHMAN GOVT SECS INC, NY 10/25/2004
OCSF0751 1102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 01.7009/6 10/26/2004 10/26/2004 100.0000 -3,500,000.000 -3,500,000.00 3,500,000.00 0.00
DD 10/25/04 10/26/2004
SEC ID:99426Y814
BROKER: CREDIT SUISSE FIRST BOSTON 10/26/2004
CORP,N Y
OCSF0751 1102:LIQUID OPER-PIMCO
11/8/2004 2:12:30PM PST
Workbench
18
Transaction Detail Report ID: EWBO09'
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE DM12 C1[ILI U0000000 10/1/2004 - 10/29/2004 Status: FINAL
-q
V!7;
04
X-1
1W
..,, r �jk.z" �Vffiffis
IS CREDIT SUISSE FB REPO 01.700%10/26/2004 10/26/2004 100.0000 0.000 0.00 165.28 0.00
DD 10/25/04 10/26/2004
SEC ID:99426Y814 10/26/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 0 1.680%10/27/2004 DD 10/27/2004 100.0000 -2,500,000.000 -2,500,000.00 2,500,000.00 0.00
10/26/04 10/27/2004
SEC ID:99427A1 12 10/27/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 01.680%10/27/2004 DD 10/27/2004 100.0000 0.000 0.00 116.67 0.00
10/26/04 10/27/2004
SEC ID:99427AI.12 10/27/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 0 1.710%10/28/2004 DD 10/28/2004 100.0000 -2,500,000.000 -2,500,000.00 2,500,000.00 0.00
10/27/04 10/28/2004
SEC ID:9942713888 10/28/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 0 1.710%10/28/2004 DD 10/28/2004 100.0000 0.000 0.00 118.75 0.00
10/27/04 10/28/2004
SEC ID:9942713888 10/28/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 0 1.740%10/29/2004 DD 10/29/2004 100.0000 -2,500,000.000 -2,500,000.00 2,500,000.00 0.00
10/28/04 10/29/2004
SEC ID:99427DO09 10/29/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 0 1.740%10/29/2004 DD 10/29/2004 100.0000 0.000 0.00 120.83 0.00
10/28/04 10/29/2004
SEC ID:99427DO09 10/29/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
111812004 2:12:30PM PST Workbench
19
Transaction Detail Report ID: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE DCM 0 00 0=0000 10/1/2004 - 10/29/2004 Status- FINAL
j��4 6-M'a"teRA -------- M A Rv� r.i�R-flw%
0
TA
ur- rr
S DREYFUS TREASURY CASH MGMT 10/6/2004 1.0000 -93,499.750 -93,499.75 93,499.75 0.00
SEC ID:996085247 10/6/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/6/2004
S DREYFUS TREASURY CASH MGMT 10/7/2004 1.0000 -98,488.580 -98,488.58 98,488.58 0.00
SEC ID:996085247 10/7/2004
OCSF07511102:LIQUID OPER-PIMCO 10/7/2004
S DREYFUS TREASURY CASH MGMT 10/8/2004 1.0000 -83,863.020 -83,863.02 83,863.02 0.00
SEC ID-.996085247 10/8/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/8/2004
S DREYFUS TREASURY CASH MGMT 10/12/2004 1.0000 -2,999,440.000 -2,999,440.00 2,999,440.00 0.00
SEC ID:996085247 10/12/2004
OCSF07511102:LIQUID OPER-PIMCO 10/12/2004
S DREYFUS TREASURY CASH MGMT 10/14/2004 1.0000 -1,099,909.220 -1,099,909.22 1,099,909.22 0.00
SEC ID:996085247 10/14/2004
OCSF07511102:LIQUID OPER-PIMCO 10/14/2004
S DREYFUS TREASURY CASH MGMT 10/15/2004 1.0000 -6,093.400 -6,093.40 6,093.40 0.00
SEC ID:996085247 10/15/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/15/2004
S DREYFUS TREASURY CASH MGMT 10/19/2004 1.0000 -99,837.560 -99,837.56 99,837.56 0.00
SEC ID:996085247 10/19/2004
OCSF07511102:LIQUID OPER-PIMCO 10/19/2004
S DREYFUS TREASURY CASH MGMT 10/22/2004 1.0000 -152,918.560 -152,918.56 152,918.56 0.00
SEC ID:996085247 10/22/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/22/2004
S DREYFUS TREASURY CASH MGMT 10/27/2004 1.0000 -680,092.780 -680,092.78 680,092.78 0.00
SEC ID:996085247 10/27/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/27/2004
TOTAL CASH&CASH EQUIVALENTS U.S. DOLLAR: -98,414,142.870 -98,327,328.73 98,359,765.55 0.00
111812004 2:12:30PM PST Workbench
20
Transaction Detail Report M: EVM009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED=2DDD0D000110D 10/1/2004 - 10/29/2004 Status: FINAL
Ivan
TOTAL CASH&CASH EQUIVALENTS BASE: -98,414,142.870 -98,327,328.73 98,359,765.55 0.00
FIRED INCOME SECURITIES
U.S. DOLLAR
S COMMIT TO PUR FNMA SF MTG 5.000% 10/15/2004 102,0820 -22,000,000.000 -22,381,562.50 22,458,046.86 76,484.36
10/01/2019 DD 10/01/04 10/19/2004
SEC ID:0 IF0504AI. 10/15/2004
BROKER: UBS SECURITIES LLC,NEW YORK
OCSF07522202:LONGTERM OPER-PIMCO
S COMMIT TO PUR FNMA SF MTO 5.500% 10/12/2004 101.8047 -3,000,000.000 -3,041,894.53 3,054,140.62 12,246.09
10/01/2034 DD 10/01/04 10/14/2004
SEC ID:0 1170526A5 10/12/2004
BROKER: GOLDMAN SACHS&CO, NY
OCSF07522202:LONGTERM OPER-PIMCO
S COMMIT TO PUR FNMA SF MTO 5.500% 10/12/2004 101.7422 -1,000,000.000 -1,013,964.84 1,017,421.87 3,457.03
10/01/2034 DD 10/01/04 10/14/2004
SEC ID:01FD526A5 10/12/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07522202:LONGTERM OPER-PIMCO
S U S TREASURY NOTES 1.875-/.01/31/2006 DD 10/5/2004 99.3477 -50,000,000.000 -49,973,541.98 49,673,828.12 -299,713.86
01/31/04 10/6/2004
SEC ID:912828BX7 10/5/2004
BROKER LEHMAN GOUT SECS INC, NY
OCSF07522202:LONGTERM OPER-PIMCO
IS U S TREASURY NOTES 1.875%01/31/2006 DD 10/5/2004 99.3477 0.000 0.00 170,686.14 0.00
01/31/04 10/6/2004
SEC ID:912828BX7 10/5/2004
BROKER LEHMAN GOUT SECS INC, NY
OCSF07522202:LONGTERM OPER-PIMCO
S U S TREASURY NOTES 1.875%01/31/2006 DD 10/5/2004 99.3477 -11,000,000.000 -10,994,179.23 10,928,242.19 -65,937.04
01/31/04 10/6/2004
SEC ID:9 1282 8BX7 10/5/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07522202:LONG TERM OPER-FIMCO
111812004 2:12:30PM PST Workbench
21
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCS D-CONSOLI DATE DM2 0 00 00000000 10/1/2004 - 10/29/2004 Status: FINAL
X;t
..,4 -�r.-..tt�M�Z���_`' _�.r:;» .,x:;� •+!.-ic.,'-t' i�a. :=f � J '}x• y�•^" :x' 2YYs� _t-'-�ss?,'4 1 `r��t�,. � � r> � �kf ry�t'.. si?.
IS U S TREASURY NOTES 1.8750/601/31/2006 DD 10/5/2004 99.3477 0.000 0.00 37,550.95 0.00
01/31/04 10/6/2004
SEC ID;912828BX7 10/5/2004
BROKER: LEHMAN GOVT SECS INC,NY
OCSF07522202:LONGTERM OPER-PIMCO
S U S TREASURY NOTES 1.625%02/28/2006DD 10/6/2004 98.9375 -17,000,000.000 -17,045,156.25 16,819,375.00 -225,781.25
02/29/04 10/7/2004
SEC ID:912828CB4 10/6/2004
BROKER:BEAR STEARNS&CO INC,NY
OCSF07522202:LONG TERM OPER-PIMCO
IS U S TREASURY NOTES 1.6250/o02/28/2006DD 10/6/2004 98.9375 0.000 0.00 28,235.50 0.00
02/29/04 10/7/2004
SEC 11);912828CB4 10/6/2004
BROKER: BEAR STEARNS&CO INC,NY
OCSF07522202:LONGTERM OPER-PIMCO
S U S TREASURY NOTES 2.250%04/30/2006 DD 10/6/2004 99.6861 -33,000,000.000 -32,835,000.00 32,896,413.00 61,413.00
04/30/04 10/8/2004
SEC ID:912828CFS 10/6/2004
BROKER: BEAR STEARNS&CO INC,NY
OCSF07522202:LONG TERM OPER-PIMCO
IS US TREASURY NOTES 2.2 50%04/30/2006 DD 10/6/2004 99.6861 0.000 0.00 324,843.75 0.00
04/30/04 10/8/2004
SEC ID:912828CF5 10/6/2004
BROKER: BEAR STEARNS&CO INC,NY
OCSF07522202:LONG TERM OPER-PIMCO
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR., -137,000,000.000 -137,285,299.33 137,408,784.00 -437,831.67
TOTAL FIXED INCOME SECURITIES BASE: -137,000,000.000 -137,285,299.33 137,408,784.00 -437,831.67
TOTAL SALES BASE: -235,414,142.870 -235,612,628.06 235,768,549.55 -437,831.67
PRINCIPAL PAYMENTS
FIXED INCOME SECURITIES
U.S. DOLLAR
111812004 2:12:30PM PST Workbench
22
EZ
i{oaag3jj0AI ,LSd Nd0F Zf Z b00Z/8/f I
b00Z/I/OI OOWId-2d3dO MZIONO'I:ZOZZZSL09SOO
b00Z/T/Oi 917,l ILEI£:QI 03S
EO/IO/I I QQ
Lb'SLT- 0£'969'£i LL'OLS'£T- 00£'969'£i- 0000'00T b00Z/T/01 STOZ/TO/ZI%000'S L86bSZO#100d VWNd Qd
b006/I/01 0OWId-HZd0 W SI DN0'T:ZOZZZSLOdSOO
b00Z/T/Oi TZ3'ITL£T£:QI O3S
£0/i0/Oi QQ
8£'IS- 8T'OTO'b 92'I90'17- 081'0I0`b- 0000'001 b00Z/I/0I 8TOZ/10/11%000'9 E96bSZ0#'I00d VWN9 ad
b00Z/T/OI OOWId-NSW M31 JNO'I:ZOZZZSL0dSO0
b00Z/i/OI £HO'I TL£T£:QI03S
£0/10/80 QQ
SL'SZ- bb'6S8 ZZ'S88- Obb'698- 0000'001 b00Z/1/01 STOZ/10/60%000'9 998b9Z0#'I00d VWN3 ad
b00Z/I/OT OOM-H3W M31ON0'I:Z06ZZ9L0dSO0
b00Z/T/O T 6ASN I L£I£:�038
EO/i0/SO Qa
89'L9- 00'9SZ'Z 89'£Z£'Z- 000'9SZ'Z- 0000'001 b00Z/1/01 8IOZ./I0/90%000'S 09LbSZO#'100d VWNJ ad
b00Z/T/OT OOWId-SSWMaL`JNO'I:ZOZZZSLOASOO
b00Z/T/OT L-.AXIL£I£:QI 03S
£0/TO/TO Q4
OE'LL- ZL'9LS'Z ZO'bS9'Z- OZL'9LS'Z- 0000'001 b00Z/T/0T 8I0Z/T0/Z0%000'9 T£9bSZO#'IOOd VWNA ad
b00Z/T/OT OOWId-NEdO K83.L0N0'I:ZOZZZ9L03SO0
b00Z/i/Oi MMX TL£T£:QI 03S
ZO/i0/Oi QQ
617'1Z£- bb'9TL'Oi £6'LEO'IT- Obb'91L'OT- 0000*001 b00Z/1/01 LTOZ/TO/11%000'9 OISbSZO#'IOOd VWN3 ad
b00Z/i/OT OOM-S3d0 W2I31ONO'I:ZOZZZSLO.dSOO
b00Z/i/OT £ZMS8b£T£:QIO2S
L6/10/ZI QQ
Zb'b bZ'TSi Z.8'9Li- ObZ'I8i- 0000'001 b00Z/i/OI SZOZ/TO/IO%b8E'9 ti909-8L#dnoao OW'IH3 Qd
b00Z/T/OT OOWId-N3d0 MaL DWI:ZOZZZSL09SOO
b00Z/I/OI S630,LE£i E:QI 03S
L6/TO/Z T QQ Z£OZ/ST/80
Zb'LI- Ob'8b£'9T Z8'S9£'9I- OOb'Sb£'9T- 0000'001 170001/0T IN IIVA V M NZS O,LW SSV'IOIl-InW 0W'IH3 ad
bOOZ/i/OT 0OWId-N2d0 M310N0'I:Z0ZZZ9L0dSO0
E30866Z0£:4103S
bOOZ/I/OT
66/TZ/01 Ga O£OZ/10/ZT
Z6'LT T6'bZS 66'908- 016'bZ8- 0000'001 bOOZ/I/OT %DOS'L OST TT-000#3JIVd NOO.LNfIH/dWM ad
=:t�seg '� :• as H � �tk -�_� - -� :� _,.. �' s �'�.dosta �� ��+�a ��pa ' odags �:�r �,;,x... o d�sasaQ ad4L
..r*�.a 6; ti`. � ,g,..a�� ci::.,f"" •t....i_ ....+.-x: �`4-+;.h..�,.. r- .:lea f^7 .��+♦_,.f�."�7�'.x�$:.�,rc, :.y;.�:.:fir+ �''�. �; -s.��.,• t ±:� eMT _'g;-r,. t' ':F�.f�p -
,� `.�,.,..$ .r,, +:`•S, � e!7^-?%�'t�±.3':� 7.c t',_ .31E W"..t..,,,�` r. Y.�Ld2rt.,..f r�'KS i:'a'^ 'r� Y r Le.�ti ,.i��i. ���'� 31e �" .L •ec.� 2'� ! {
',sSQ'II �;� ,: OII-V•.},� '�*-�� ,,,�,T9J ���
,bra'k
.p`..Iz<rf r ' ..,,,�r :_F. ..r ..;, rr s+7S¢'�^�° ,T,.:.. �i� �t ....i-?�. -n•.•,}7.c��`'.. �?iT '� ..i-��}- �f;' .t�s':�.�al �� .1... .+c' ✓ o.4..S: `.l.�, { .:_.. �._ .�`tt'•.`:--3$...;'�.i�`r.n„��'k 3. ���r,' SN� ..�'u« `.�.r.'.�� 1.- 2.4 rsd:i^c;l:'3�'. v� � Y2..: .�,�:�"F�r t.�., v::��.rr�I;
F600livxia °min$ tpOOZ/6Z/01 - tPOOZA/OI ❑❑❑❑❑❑❑❑❑❑❑ZIMQ3.LVU110SN00•aSO0
STM asn :AaIIa�3 aSBe Axo2a;8o uoz;assuBay,&q papodag U01jew:cn 3=odea JRB;aQ UOTIONsuBJJ, J
' bz
ypuaq3f.joM
LSd Nd0C ZI Z 60027/o/T I
boot/i/Oi O0WId-H3dO Mal ONO'i:Z0ZZZSZOdS00
zs3xssEI£:QIOES
booz/i/ol Eo/Io/so QQ
Tz'9Ii- TL'£LS'E Z6'686'E- 0IL'£L8'£- 0000*001 bOOZ/1/01 810Z/I0/90%000'5; SbSSSSO#'IOOd VWNq Qd
booz/i/Oi 00WId-XgdO W2SION0'I:Z0ZZZSL03S00
WAGX98Ei£:0 DES
booz/i/ol £o/i0/bo aQ
L8'9- zE'9ES 61'£bS- 0ZE'9ES- 0000'001 bOOZ/i/oi SiOZ/10/90%000•9 ESbSSSO#'IOOd VWNd Qd
booz/i/OI 00WId-ZI:RdO M9J,ON0'1=Z0ZZZSL0flS00
i ASMSSET£CII DES
booz/T/Oi £0/i0/EO OQ
6L'191- b9'690'9 £b'IIZ'S- 0b9'690'9- 0000*00I bOOZ/T/OT SIOZ/10/b0%000'9 £9£9S90#'I00d VWM (Id
booz/i/OI 00WId-'dSdO W ZION0'I:Z0ZZZSLOdS00
booz/i/oi 8aZAb8£I£:QI0ES
o0/TO/LO OQ
8911£I- 8S'9S0'E 9Z'i6i`E- 08S'9So'£- 0000*001 booz/i/OT SIOZ/Io/90%000'9 ISbSESO#'Iood VWNd (Id
booz/i/Oi 00W1d-NSdO MaL`JN0'I:Z0ZZZSLOdS00
booz/I/Oi 0MHa£8EIE:QI0ZS
66/10/60 QQ
9S'6Lo'I- ZL'OOS'bz 8z'08s'Sz- OZL'OOS'bz- 0000*001 b00Z/T/OT bIOZ/I0/60%000'9 61,96090#'I00d VWN3 Qd
booz/T/oi 03Md-2IEdO MaL ONO'I:Z0ZZZSL03So0
booz/T/Oi Z.L00I8EiE:QIDES
66/10/7,0 QQ
8b'961- bL'Lb8'z ZZ'£L6'Z- 0bL'Lb8'z- 0000'00I bOOZ/I/0I t,1U/I0/Z0%000'9 Z8b9Sb0#'100d VWNd (Id
booz/i/Oi 00WId-2I3dO W231ON01:Z0ZZZSL03S00
-woz/i/Oi ILVA9LEI£:QI0ES
EO/10/60 GO
18'8LZ- 68'ZSL'bZ 0L'I90'SZ- 068'Z8L'bZ- 0000'001 booz/1/01 8I0Z/i0/60%000'S o£bLSEo#'IOOd VWNd ad
booz/i/ol OOMd-IMO MaL JNO'I:ZOZZZSLOgSOO
boot/I/Oi 8Wb[`9LEi E:01 DES
EO/io/i0 QI]
S£'bi- 9E'8Lb IL'Z6b- 09E'8Lb- 0000'00I b00Z/I/01 8I0Z/i0/IO%000'S 8ZELS£0# IOOd VWNd Qd
booz/i/oI OOWId-2ISdO MaL JNO'I:ZOZZZSLOdSOo
booz/i/Oi OWZLbLEIE:Cll DES
66/I0/60 QQ
8£'69I- ST'bb8'E £S'Eio'b- oSi'b78'E- 0000'001 booz/I/0I bIOZ/10/170%000'9 086£Z£0#'IOOd VWN.d Qd
w—
�c 1=_3 �-.. - .;�.r .,w V.! j s .. g �!'s.e:F. ,. :�'?;•,) .:��, z ��� "vtl�'A'4'
. ..n., 3 r" ;1i'; '�..:ciR fit,-i�.c.� ��.. ;�jt:. .k_ �"�• :tc. ::-.°:: .�,. •�Y'.a.,r:.s;'a,.�3%' o. '"���,.,• r?" � -f �N•:
\L.•OP .si .9,.-t*."r.. i4S.. c^'•Fs •:r. ;3 r 'z+.
/� n�€�`•'J �.C?}i`, ;�rY. ,} ixt+ '$ :4`..,}
FI
VMq C81;ln$ 1000Z/6Z/OT - VOOZ/T/Oi ❑❑❑❑❑❑❑❑❑❑❑�aSIVCIIZOSNOo-GSOO
asn :Sauaisn0 ages dsollop3 uopousu8ij,Aq popodag
HM3 :aj IpodoU jFs;aQ uoT:10138u8.i1, uQlla
Transaction Detail Report ED: EVM009
D
E7
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE DME2 0 DO OOODOFJO0 10/1/2004 10/29/2004 Status: FINAL
IN,
c6d da
PD FNMA POOL40555621 5.000%07/01/2018 10/1/2004 100.0000 -15,429.260 -15,602.84 15,429.26 -173.58
DD 06/01/03 10/1/2004
SECID:31385XG68 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0681309 5.000%02/01/2018 10/1/2004 100.0000 -10,385.010 -10,696.56 10,385.01 -311.55
DD 02/01/03 10/1/2004
SEC ID:31391Y3S4 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOLO0681334 5.000%02/01/2018 10/1/2004 100.0000 -814.220 -838.65 814.22 -24.43
DD01/01/03 10/1/2004
SEC ID:31391Y4T1 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA GTD REMIC P/T 02-76 PD 5.000% 10/1/2004 100.0000 -135,344.850 -138,051.75 135,344.85 -2,706.90
08/25/2022 DD 10/01/02 10/1/2004
SEC ID:31392FKF3 10/1/2004
OCSF07522202:LONGTERM OPER-PEMCO
PD FNMA POOL#0684908 5.000%06/01/2018 10/1/2004 100.0000 -4,144.330 -4,197.43 4,144.33 -53.10
DD 05/01/03 10/1/2004
SEC ID:31400D3R1 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0685200 5.000%03/01/2018 10/1/2004 100.0000 -3,261.940 -3,303.73 3,261.94 -41.79
DD 03/01/0 3 10/1/2004
SEC 1D:31400EGH7 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD FNMA POOL#0685665 5.000%02/01/2018 10/1/2004 100.0000 -463.240 -477.14 463.24 -13.90
DD 02/01/03 10/1/2004
SEC ID:31400EW22 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOLO0686318 5.000%03/01/2018 10/1/2004 100.0000 -1,874.830 -1,931.07 1,874.83 -56.24
DD 03/01/03 10/1/2004
SEC ID:31400FPB7 10/1/2004
OCSF07522202:LONGTERM OPER-PEMCO
PD FNMA POOL#0688739 5.000%06/01/2018 10/1/2004 100.0000 -500.610 -515.63 500.61 -15.02
DD 06/01/03 10/1/2004
SEC ID-31400JEL9 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
25
Transaction Detail Report m: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE DIM 000❑❑0❑DODD 10/1/2004 - 10/29/2004 Status: FINAL
...-.... ., .;� �.•c'7d?lt". )).,`,•k,_ ,y �p�yyy• :.r refi°'�T�x {�.y.. ^J✓ y '�£ '2,t 3y-�''-..� ,,y ,y,..,n•-. .;:� _
•CIF. :£ ..£, fi... .., .;,.t :,.A' � 'pn' nt it;;{; � j � a?a,. j�,t.;'t- ,t�,bb , ai' e.'';v '°'i`f- y ;kt;•�s-.�'... �r.
na�t�3f;�
e. �
;.tfft:✓.-.�t?t. _`�T.�+ �.�',. „ .l,..y,CiP E �kJ �� "-i -y. N` e x: t..E�; �� t- '.� `y �."^.z'i
�.etc R.ti:t: taa�te �y�p�7/ N�sPr`� '�' � i,� ,-.'ter. �t•':d
i s,. _P,......-..� `}���Iris�i. :._J.,..,.ci�q�:^..,r,..w...- .:-..�.�1.�:.•o. .._.......,..:..a+�?s �'S^:�./e,is,._:—�.!�i'� ,_ ,a�:k�.k:4�" ..s�'1'�,yl�...�'tasr �. +^x' �.�._. . c...:. .<}.
nDa
PD FNMA POOL40689859 5.000%05/01/2018 10/1/2004 100.0000 -379.740 -384.61 379.74 -4.87
DD 05/01/03 10/1/2004
SEC ID:31400KMG8 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0693834 5.000%03/01/2018 10/1/2004 100.0000 -7,854.020 -8,089.64 7,854.02 -235.62
DD 03/01/03 10/1/2004
SEC ID:3140OPY74 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD FNMA POOL#0695852 5.000%05/01/2018 10/1/2004 100.0000 -5,101.370 -5,254.41 5,101.37 -153.04
DD 05/01/03 10/1/2004
SEC ID:31400SBVO 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0695889 5.000%05/01/2018 10/1/2004 100.0000 -17,052.400 -17,563.97 17,052.40 -511.57
DD 05/01/03 10/1/2004
SEC ID:31400SC23 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD FNMA POOL#0697026 5.000%05/01/2018 10/1/2004 100.0000 -484.010 -498.53 484.01 -14.52
DD 04/01/03 10/1/2004
SEC ID:31400TLF2 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0702210 5.000%05/01/2018 10/1/2004 100.0000 -1,474.320 -1,518.55 1,474.32 -44.23
DD 05/01/03 10/1/2004
SEC ID:31401ADP9 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD FNMA POOL#0702328 5.000%05/01/2018 10/1/2004 100.0000 -1,955.760 -1,980.82 1,955.76 -25.06
DD 04/01/03 10/1/2004
SEC ID:31401AHD2 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0709148 5.000%06/01/2018 10/1/2004 100.0000 -1,891.100 -1,947.83 1,891.10 -56.73
DD 06/01/03 10/1/2004
SEC ID:31401 HZM7 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0709360 5.000%07/01/2018 10/1/2004 100.0000 -16,381.090 -16,590.97 16,381.09 -209.88
DD 06/01/03 10/1/2004
SEC ID:31401JB56 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
I1/8/2004 2:12:30PM PST
Workbench
26
LZ
WuagxloM 1.Sd Wd08:ZT:Z f,00Z/8/IT
vooZ/i/OT OOWId-H3dO MaL0N0'I:ZOZZZSLOdSO0
�OOZ/I/OT t,MAXIObIE:dIO38
£0/I0/90 QQ
61'84- £Z•9o9'Z Zt"b89'Z- OEZ'9o9'Z- 0000'OOT tOOZ/1/01 8IOZ/i0/L0%000'S 6Z9TZL0#1OOd VWNd (Id
b00Z/i/OI OOMcf-2i3dO M31`JNO'I:ZOZZZSLOdSOO
b00Z/i/OT ON1 M TobT£:QI OaS
£0/IO/90 QQ
E6'8LVT- 92'46Z'6V 6t,'9L4'O9- 099'L6Z'6b- 0000.00I VOOZ/1/01 8i0Z/T0/90%000'S 69£OZLO#100d VWN.q ad
vooZ/i/OT OOWId-X2d0 W219.L DWI:ZOZZZSLOdSOO
b00Z/i/Oi S40MTobTE:QIO3S
£0/10/LO 17Q
9I't7t?- oS•9bt'E 99'06t,'E- o0S'9bt"£- 0000'OO1 tOOZ/T/OI SiOZ/TO/LO%000'S 6T£OZLO#10Od VWNd Qd
b00Z/i/OI OOWId-2I3dO MaL0N0'I:ZOZZZSL03SOO
b00Z/i/OI ISaNlobi£:QIOss
£0/i0/LO QQ
ZS'Z9- 'vZ•6L8't, 9L•Tt,6't,- OtZ'648't,- 0000'OOI tOOZ/1/01 8IOZ/I0/LO%oo0'S 99EETL0#100d VWNB ad
toot/i/OT OOMd-d2ldO WdaLONO'I:ZOZZZSLOdSOO
b00Z/T/OT ZSdNTObTE:QIO3S
EO/10/90 Go
bi'Z- TZIL SE•EL- OTZ'TL- 0000.001 tOOZ/1/01 8TOZ/i0/90%000'S tfi££TL0#'I0Od VWN3 ad
b00Z/T/OT OOWId-NZdO M21 ONO'l:ZOZZZSLOASO0
�ooZ/T/oi B�TotIT£:rn 03S
£0/10/90 Qa
68'E£I- Z6'Z96't, 18.969't,- OZ6'Z9b'i7- 0000'OO1 tOOZ/I/01 8TOZ/i0/90%000'S S£ZOILO#100d VWNS ad
b00Z/T/OT OOWId-'dZdO W2 21 DNO'I:6OZ6Z9L0.3SOO
b00Z/i/Oi OAMf'TobT E:QI O8S
EO/10/90 QQ
L6.0- Stl'SL Zt,•9L- oSb'SL- 0000'OO1 t�OOZ/1/01 STOZ/T0/90%000'S E9660LO#'I00d VWMA ad
V006/1/01 OOWId-2T2dO MaLONOI:ZOZZZSLOdSOO
b00Z/T/Oi IWArIObTE U 03S
£0/io/90 QQ
90'9tp- 86't,69'E tp0'Ib9'£- 086'1769'£- 0000.001 t,00Z/I/01 8i0L/i0/90%000'S 41660L011100d VWNd Qd
vooz/T/OT OOWId-'dZdO WHaL`JNO'I:ZOZZZGL09800
b00Z/T/OT t,dSf lolK E:QI 03S
£0/10/90 04
86'6I- Zi'6SS'I O1'6LS'T- OZ.T'6SS'I- 0000'OOI tOOZ/1/0I 8TOZ/I0/90%000'S 9Z860L0#'IOOd VWNS ad
•_ ^y -' gtyFr,.=.... W .;._..^�k `. x-xx f '...- -F�:t` _F. ..Y - _t-.. :' '{t^df�:F. i%... : - Y- c»+ - * ,
• � :s k -� �.-. _. r.,.a , .n�, �' Q��-- ��� Pa odar2i�.�- . �=��II d 8wQ.,ad6,ti
��: �.°� - �Y.x-.r, t; .F .�.. #, +•-r ,. -�". r• ..-,?r +i ui ;.!"�i.�. �. :x. � � ftFr���i.�6..r,.' 't n«F. �... ,.,t,t}`• �x _r f..� „f ,fit , .{.�"t����a. 'a:& xI � cf.t..s .�... �.o-:, bx,..;x x � � C�
,,..- x �.,,.�: .�.q ..�,.. s �3':x'n�" Z� y.• � �a_is � F�:r, �: •fin <. '�'�rt=�'.f�l F��•`z�.'<. r .�'ix�.. -
.. c F �1d .. F.V Y::: kTf-'�...i. ,:.� a 1' 'i t� ;'{:•Y }.. ..' -
�jr$
' sT"Fa�`%.,,xs -.i µ.'to. � S R� T:.i U 5 .1�- i... x _' .•.,. 11' - ,i:n tV#.. 4'r ,a 4K. .i. S �x.Y`.x.. �. V•A{S j'if ,TS'.
•et�:_ t,s.�t:i,`�r• ,:�,».,.. + .,.`� .s:e:,.. .max: x .as..,_...t.t.....�a,-.t7' ,I:.,r,,r, .»�a; >aiixs, a�tx..ic ..,�a...a.:''i�'7'�sr�i'���Q� p�Jr`��'�-�:3 ',..c�;tk.r�..d. i..,.r<fi. x€:�� .�e>�:. .rrs;:.:
Wxl3 gs tpOOZ/6Z/0I tO OZ/T/01 ❑❑❑❑❑❑❑❑❑❑❑ZMa 3LV atIO SNOO-Cl
Qui
asa :Soua=3 ass xo2ap3 uopousuaf,Aq papodag U01jaW
=600M
U840Q u0pausulux
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCS D-CONSOLI DATED=0 0000000000 10/1/2004 - 10/29/2004 Status: FINAL
,wi
-z; !MTfAd ::.:
DIV
n,
PD FNMA POOL#0723487 5.000%06/01/2018 10/1/2004 100.0000 -953.180 -963.90 953.18 -10.72
DD 06/01/03 10/1/2004
SEC ID:31402AXQ4 10/1/2004
0CSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0729601 5.000%07/01/2018 10/1/2004 100.0000 -6,982.740 -7,072.21 6,982.74 -89.47
DD 07/01/03 10/1/2004
SEC ID:31402HRW3
0CSF07522202:LONGTERM OPER-PIMCO 10/1/2004
PD FNMA POOL#0732873 5.000%11/01/2018 10/1/2004 100.0000 -135.080 -136.81 135.08 -1.73
DD 10/01/03 10/1/2004
SEC ID:31402MF7q5
0CSF07522202:LONGTERM OPER-PIMCO 10/1/2004
PD FNMA POOL#0737130 5.000%10/01/2018 10/1/2004 100.0000 -44,436.270 -45,005.61 44,436.27 -569.34
DD 10/01/03 10/1/2004
SEC ID:31402S4P9 10/1/2004
0CSF0752 2202:LONGTERM OPER-PIMCO
PD FNMA POOL#0738211 5.000%10/01/2018 10/1/2004 100.0000 -2,451.500 -2,482.91 2,451.50 -31.41
DD 10/01/03 10/1/2004
SEC ID:31402UDQ2 10/1/2004
0CSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL 40738487 5.000%10/01/2018 10/1/2004 100.0000 -2,975.170 -3,013.29 2,975.17 -38.12
DD 10/01/03 10/1/2004
SEC ID:31402UNC2 10/1/2004
OCSF07522202:LONGTERM OPER-P[MCO
PD FNMA POOL40740471 5.000%10/01/2018 10/1/2004 100.0000 -2,901.430 -2,938.60 2,901.43 -37.17
DD 10/01/03 10/1/2004
SEC ID:31402Wr4O 10/1/2004
0CSF0752 2202:LONGTERM OPER-PlMCO
PD FNMA POOL#0740748 5.000%10/01/2018 10/1/2004 100.0000 -3,439.480 -3,483.55 3,439.48 -44.07
DD 11/01/03 10/1/2004
SEC ID:31402WSH7 10/1/2004
0CSF0752 2202:LONGTERM OPER-PIMCO
PD FNMA POOL#0743868 5.000%11/01/2018 10/1/2004 100.0000 -850.440 -861.34 850.44 -10.90
DD 10/01/03 10/1/2004
SEC ID:31403BMR 1 10/1/2004
0CSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
28
Transaction Detail Report ED: EVM009
@ Mellon Reported by Transaction Category Base Currency- USD
OCSD-CONSOLI DATE DU=0 110 0000CDOD 10/1/2004 - 10/29/2004 Status: FINAL
7�"
d% t6
y
PD FNMA POOL#0744008 5.000%07/01/2018 10/1/2004 100.0000 -5,078.970 -5,144.04 5,078.97 -65.07
DD 09/01/03 10/1/2004
SECID:31403BR54 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD FNMA POOL#0744316 5.000%09/01/2018 10/1/2004 100.0000 -3,411.380 -3,455.09 3,411.38 -43.71
DD 09/01/03 10/1/2004
SEC ID:31403B3Z4 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0747914 5.000%11/01/2018 10/1/2004 100.0000 -1,879.050 -1,903.13 1,879.05 -24.08
DD 11/01/03 10/1/2004
SEC 11):31403F3XO 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0748400 5.000%08/01/2018 10/1/2004 100.0000 -3,729.920 -3,777.71 3,729.92 -47.79
DD 09/01/03 10/1/2004
SEC ID:31403GNR9 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0748899 5.000%12/01/2018 10/1/2004 100.0000 -4,146.120 -4,199.24 4,146.12 -53.12
DD 11/01/03 10/1/2004
SEC 11):31403G7LO 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD FNMA POOL#0750377 5.000%11/01/2018 10/1/2004 100.0000 -42,160.020 -42,700.20 42,160.02 -540.18
DD 11/01/03 10/1/2004
SEC ID:31403JUA2 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD, FNMA POOL#0750380 5.000%11/01/2018 10/1/2004 100.0000 -8,539.710 -8,649.13 8,539.71 -109.42
DD 11/01/03 10/1/2004
SEC ID:31403JUD6 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0750445 5.000%11/01/2018 10/1/2004 100.0000 -700.160 -709.13 700.16 -8.97
DD 11/01/03 10/1/2004
SEC 11):31403JWE2 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD FNMA POOL#0751960 5.000%12/01/2018 10/1/2004 100.0000 -5,896.430 -5,971.98 5,896.43 -75.55
DD 11/01/03 10/1/2004
SEC ID:31403LMHI 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
29
Transaction Detail Report M: LWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCS D-CONS OLI DATE DMI2 0 00 00000000 10/1/2004 - 10/29/2004 Status: FINAL
Ut4,v -.Ld-D
1,jj
W-wi
PD FNMA POOL#0753425 5.000%11/01/2018 10/1/2004 100.0000 -3,509.240 -3,549.82 3,509.24 -40.58
DD 11/01/03 10/1/2004
SEC ID:31403NA23
OCSF07522202:LONGTERM OPER-PIMCO 10/1/2004
PD FNMA POOL#0755165 5.000%12/01/2018 10/1/2004 100.0000 -2,593.080 -2,626.30 2,593.08 -33.22
DD 11/01/03 10/1/2004
SEC ID:31403Q6A3 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD FNMA POOL#0756372 5.000%11/01/2018 10/1/2004 100.0000 -9.648.920 -9,760.49 9,648.92 -111.57
DD 11/01/03 10/1/2004
SEC ID:31403SJR8 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD GNMA POOL 00421389 6.500%04/15/2026 10/1/2004 100.0000 -349.340 -366.64 349.34 -17.30
DD 04/01/96 10/1/2004
SEC ID:36206LJC23 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD GNMA POOLO0449851 6.500%01/15/2028 10/1/2004 100.0000 -39.500 -41.46 39.50 -1.96
DD 01/01/98 10/1/2004
SEC ID:36208FWLO 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD GNMA POOL#0466845 6.500-/.06/15/2028 10/1/2004 100.0000 -50.870 -53.39 50.87 -2.52
DD 06/01/9 8 10/1/2004
SEC ID:36209E]TA6 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD GNMA POOL 4G468052 6.500%07/15/2028 10/1/2004 100.0000 -211.470 -221.94 211.47 -10.47
DD 07/01/98 10/1/2004
SEC ID:36209C5M4 10/1/2004
OCSF07522202:LONG TERM OPER-P[MCO
PD GNMA POOL#0476041 6.500-/.06/15/2028 10/1/2004 100.0000 -7,954.720 -8,336.30 7,954.72 -381.58
DD 06/01/98 10/1/2004
SEC ID:36209MZE7 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD GNMA POOL#0478626 6.500%01/15/2029 10/1/2004 100.0000 -186.220 -195.15 186.22 -8.93
DD 01/01/99 10/1/2004
SEC ID:36209QVT9 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
30 1
Transaction Detail Report ID: EWB009'
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONS OLI DATE DEM El DO 00000DO11 10/1/2004 - 10/29/2004 Status: FINAL
4T
PD GNMA POOL#0480598 6.5000/. 10/15/2028 10/1/2004 100.0000 -38.560 -40.41 38.56 -1.85
DD 10101/98 10/1/2004
SEC ID:36209S3Fb 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD GNMA POOL#05 12235 6.5009/o 11/15/2029 10/1/2004 100.0000 -12.370 -12.98 12.37 -0.61
DD 11/01/99 10/1/2004
SEC ID:36211 GBC6 10/1/2004
OCSF07522202:LONGTERM OPER-PEMCO
PD GNMA POOL#0514326 6.5000/o07/15/2029 10/1/2004 100.0000 -350.960 -367.80 350.96 -16.84
DD 07/01/99 10/1/2004
SEC ID:36211 JLF2 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD GNMA If POOL 40080023 VAR RT 12/20/2026 10/1/2004 100.0000 -4,178.500 -4,247.71 4,178.50 -69.21
DD 12/01/96 10/1/2004
SEC ID:36225CAZ9 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD GNMA 11 POOL#080088M 7.375%06/20/2027 10/1/2004 100.0000 -8,674.030 -8,863.77 8,674.03 -189.74
DD 06/01/97 10/1/2004
SEC ID:36225CC20 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD GNMA 11 POOL#0080395 VAR RT 04/20/2030 10/1/2004 100.0000 -8,382.280 -8,306.32 8,382.28 75.96
DD 04/01/00 10/1/2004
SEC ID:36225CNM4 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD GNMA 11 POOL#080408X 6.500%05/20/2030 10/1/2004 100.0000 -49,005.680 -48,507.97 49,005.68 497.71
DD 05/01/00 10/1/2004
SECID:36225CN28 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD GNMA 11 POOL#0080900 VAR RT 05/20/2034 10/1/2004 100.0000 -2,930.860 -2,851.64 2,930.86 79.22
DD 05/01/04 10/1/2004
SEC ID:36225DAA2 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
PD GNMA 11 POOL#0080965 VAR RT 07/20/2034 10/1/2004 100.0000 -9,582.510 -9,576.52 9,582.51 5.99
DD 07/01/04 10/1/2004
SEC ID:36225DCB8 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
31
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE Da=DOD❑❑❑❑❑❑❑❑ 10/1/2004 - 10/29/2004 Status: FINAL
� w _
�'xk• ,ffd".irjj�� !Y;tc`.�' s.... �•� �' //�,�, �«�vv�yyRY�s r'�',:r!a tf�i �... .ai�.,� ,u�'i (- 7` 'h�q`'". �,rFK.' .,. �.rrY'':"` F ,J J=:
y—e�.:
S' '.:.;. ''31�-'M •�
t.(,/��.�� F�.(I•ySA �)y'' r•. _ .� r4 ....i=e;i��>'.y _.(, .a k,g .c. 7..Y 4�t • � r,, f, �',,. .t,�
�'.
PD GNMA GTD REMIC TR 2000-9 FH VAR RT 10/16/2004 100.0000 -13,509.440 -13,509.44 13,509.44 0.00
02/16/2030 10/16/2004
SEC ID:3837H4NX9
OCSF07522202:LONGTERM OPER-PIMCO 10/16/2004
PD RESIDENTIAL ASSET 03-RSI 1 AUB VAR RT 10/25/2004 100.0000 -35,564.470 -35,564.47 35,564.47 0.00
12/25/2033 DD 12/30/03 10/25/2004
SEC ID:760985K83
OCSF07522202:LONGTERM OPER-PIMCO 10/25/2004
TOTAL FIRED INCOME SECURITIES U.S.DOLLAR -712,674.120 -724,012.62 712,674.12 -11,338.50
TOTAL FIRED INCOME SECURITIES BASE: -712,674.120 -724,012.62 712,674.12 -11,338.50
TOTAL PRINCIPAL PAYMENTS BASE: -712,674.120 -724,012.62 712,674.12 -11,338.50
MATURITIES
CASH&CASH EQUIVALENTS
U.S. DOLLAR
MT WELLS FARGO BANK NA INSTL C/D 1.650% 10/7/2004 100.0000 -1,100,000.000 -1,100,000.00 1,100,000.00 0.00
10/07/2004 DD 09/09/04 10/7/2004
SEC ID:9497P1BU2 10/7/2004
OCSF07511102:LIQUID OPER-PIMCO
MT WELLS FARGO BANK NA INSTL C/D 1.600% 10/4/2004 100.0000 -2,200,000.000 -2,200,000.00 2,200,000.00 0.00
10/04/2004 DD 08/30/04 10/4/2004
SEC ID:9497P1CL1 10/4/2004
OCSF0751 1102:LIQUID OPER-PIMCO
TOTAL CASH&CASH EQUIVALENTS U.S. DOLLAR -3,300,000.000 -3,300,000.00 3,300,000.00 0.00
TOTAL CASH&CASH EQUIVALENTS BASE: -3,300,000.000 -3,300,000.00 3,300,000.00 0.00
FIRED INCOME SECURITIES
U.S. DOLLAR
111812004 2:12:30PM PST Workbench
32 ,
Transaction Detail Report ID: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATE D=O 0 D 11111:11311 E100 10/1/2004 10/29/2004 Status: FINAL
�}!��3�i-'y+u•* -r,�yt;s. .wl .�;; :�. {.�,a%.�. Y�'�;�'c. S� -.:i.. •.i�V. � r— :�iGa�{ �Ii' i T � � "!� �-tr�;!' _gi � t.7 i!_�:..•:kl' "z st•` s'�b7
NIT DU PONT El DE NEMOURS 8s CO NT 6.750% 10/15/2004 100.0000 -1,575,000.000 -1,589,663.25 1,575,000.00 -14,663.25
10/15/2004 DD 10/20/99 10/15/2004
SEC ID:263534BH1 10/15/2004
OCSF07511102:LIQUID OPER-PIMCO
NIT PACIFICORP SECD MTN#TR 00115 7.300% 10/22/2004 100.0000 -3,000,000.000 -2,950,530.00 3,000,000.00 49,470.00
10/22/2004 DD 10/22/92 10/22/2004
SEC ID:69512EEU5 10/22/2004
OCSF0752 2202-.LONG TERM OPER-PIMCO
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: -4,575,000.000 -4,540,193.25 4,575,000.00 34,806.75
TOTAL FIXED INCOME SECURITIES BASE: -4,575,000.000 -4,540,193.25 4,575,000.00 34,806.75
TOTAL MATURITIES BASE: -7,875,000.000 -7,840,193.25 7,875,000.00 34,806.75
INTEREST
CASH&CASH EQUIVALENTS
U.S.DOLLAR
IT WELLS FARGO BANK NA INSTL C/D 1.650% 10/7/2004 1,100,000.000 1,411.67 1,411.67 0.00
10/07/2004 DD 09/09/04 10/7/2004
SECID.9497PIBU2 10/7/2004
OCSF07511102:LIQUID OPER-PIMCO
IT WELLS FARGO BANK NA INSTI,C/D 1.600% 10/4/2004 2,200,000.000 3,422.22 3,422.22 0.00
10/04/2004 DD 08/30/04 10/4/2004
SEC ID:9497P1CL1 10/4/2004
OCSF07511102:LIQUID OPER-PIMCO
CW SHORT TERM FDS INT ADJ NET OF 10/29/2004 0.000 -1,070.00 -1,070.00 0.00
OVERNIGHT INTEREST 10/29/2004
SEC ID:990000PJ4 10/29/2004
OCSF07511102:LIQUID OPER-PIMCO
IT DREYFUS TREASURY CASH MGMT 10/5/2004 0.000 1,252.03 1,252.03 0.00
SEC ID:996085247 10/1/2004
OCSF07522202:LONGTERM OPER-PIMCO 10/5/2004
111812004 2:12:30PM PST Workbench
33
Transaction Detail Report ID: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCS D-CONSOLI DATE DGM 0 110 DOD00000 10/1/2004 - 10/29/2004 Status: FINAL
IT DREYFUS TREASURY CASH MGMT 10/5/2004 0.000 2,902.53 2,902.53 0.00
SEC ID:996085247 10/1/2004
OCSF07511102:LIQUID OPER-PIMCO 10/5/2004
TOTAL CASH&CASH EQUIVALENTS U.S. DOLLAR. 3,300,000.000 7,918.45 7,918.45 0.00
TOTAL CASH&CASH EQUIVALENTS BASE: 3,300,000.000 7,918.45 7,918.45 0.00
FIXED INCOME SECURITIES
U.S.DOLLAR
IT DU PONT El DE NEMOURS&CO NT 6.750% 10/15/2004 1,575,000.000 53,156.25 53,156.25 0.00
10/15/2004 DD 10/20/99 10/15/2004
SEC ID:263534BHI 10/15/2004
OCSF07511102:LIQUID OPER-PIMCO
IT WMP/HUNTOON PAIGE#000-11150 7.500% 10/1/2004 819.190 5,872.29 5,872.29 0.00
12/01/2030 DD 10/21/99 9/1/2004
SEC ID:302998GE3 10/1/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT WMP/HUNTOON PAIGE#000-11150 7.500% 10/28/2004 824.910 5,867.17 5,867.17 0.00
12/01/2030 DD 10/21/99 10/1/2004
SEC ID:302998GE3 10/28/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FHLMC MULTICLASS MTG SER E3 A VAR RT 10/15/2004 23,472.900 2,704.11 2,704.11 0.00
08/15/2032 DD 12/01/97 9/1/2004
SEC ID:3133TCE95 10/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FHLMC GROUP#78-6064 6.384%01/01/2028 10/15/2004 2,548.610 185.78 185.78 0.00
DD 12/01/97 9/1/2004
SEC ID:31348SWZ3 10/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0254510 5.000%11/01/2017 10/25/2004 10,716.440 2,893.23 2,893.23 0.00
DD 10/01/02 10/1/2004
SEC ID:31371 KVI34 10/25/2004
OCSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
34 1
S£
ipuaq:yloM 13d INdOC Z I:Z b00Z/S/l I
b00Z/SZ/OT OOMd-83dO M31ONOI:ZOZZ ZSLOASOO
b00Z/i/OT Z.LOOISET E:al 03S
66/10/ZO as
00'0 8b'SZZ 8b'SZZ ObL'Lb8'Z b00Z/SZ/0I tIOZ/10/ZO%000'9 Z8b99b0#1OOd VWNq LI
b00Z/SL/O1 OOMd-2I3dO M31 DNO l:ZOZZZSLOdSOO
b00Z/T/Oi TLVN9L£TE:alO3S
£O/TO/60 Qa
00'0 OT'LSS'S OT'LSS'S 068'Z8L'bZ b00Z/SZ/01 8IOZ/10/60%000'S OEbLS£0#1OOd VWN3 LI
b00Z/SZ/Oi OOWId-213dO M3.L ONO1:ZOZZ ZSLOASOO
b00Z/i/OT SWbf'9LET£:al O3S
£0/TO/TO as
00'0 b9'901 b9'9O1 09£'8Lb b00Z/SZ/0I 8TOZ/T0/TO%000'S 8ZELS£0#'1OOd VWNd ZI
b00L/SZ/OT OOWId-83dO M31ONOl:ZOZZZSL03SOO
b00Z/I/OT OWU17LE1E:al O3S
66/10/60 as
00'0 19'18L 19'18L OST'bb8'£ b00Z/SZ/01 bIOZ/TO/b0%000'9 086EZ£O#1O0d VWN3 ,LI
b00Z/SZ/OT OOWId-83dO M3,LDNO'I:ZOZZZSL03SOO
b00Z/i/OI 9bd'I ILEIE:al 03S
£0/IO/I I as
00'0 £L'£09'£ £L'£09'£ 00£'969'£T b00Z/SZ/01 8IOZ/10/ZT%000'S L8617SZO#1OOd VWNd �l
b00Z/SZ/01 00Pld-HZdO M31 ONO'I:ZOZZZSL03SOO
b00Z/i/0i 1Z311LEI£:GI O3S
£0/10/0I as
00'0 8I'9Z£'i 8I'9Z£'I 081'010'b b00Z/SZ/01 8TOZ/TO/TT%000'S E96bSZO#1O0d VWN8 Zl
b00Z/SZ/OI OOMd-S3dO MR1 ONO'I:ZOZZZSLOASOO
b00Z/T/OI ET3OIILETE:al MS
EO/TO/80 Qa
00'0 I8'0SZ 18'09Z Ob17'698 b00Z/SZ/01 8IOZ/T0/60%000'S 998bSZO#1OOd VWNJ ZI
b006/SZ/OT O3WId-213dO M31 ONOl:ZOZZZSL03SOO
b00Z/I/0 T 6AS)l I LE T E:al O3S
£0/TO/SO as
00'0 89'£SS 89'£SS 000'9SZ'Z b00Z/SZ/01 81OZ/T0/90%000'S 09LbSZO#'00d VWN3 Zl
b00Z/SZ/OT OOMd-d3dO M3.LONO'I:ZOZZZSLOdSOO
b00Z/i/0T Lt,AX IL£I£:al 03S
£0/TO/TO Qa
00'0 19'ZZ9 19'ZZ9 OZL'9LS'Z b00Z/SZ/01 81OZ/T0/ZO%000'S lE917SZO#1O0d VWN3 LI
aqua - ogles aqua sled/saslegg aqua a;uQ papodaH7 uopdposaa adAL
ssoZ/UTSD lox ;unowV 4903 0011d 0:113Q op:jas U73s.L
a4va opuzL
F60CEM3
ti00Z/6Z/OI - VOOZ/i/OT ❑❑❑❑❑❑❑❑❑c❑z�n a3 LvallosNoo asoo
asn :6auaunO asou Azo9a;83 umpissumL Aq papodag U01je I ,:QI podag P1349 IIOTI;�8SII81�j, YY
9£
youagx.ioM
LSd I11d0C:Z7rZ POOV8/II
booz/Sz/Oi 03WId-H3d0 MMLONO'I:ZOZZZSLOdSOO
booz/i/OT £d}IdZ6£T£:QI 03S
ZO/TO/Oi QQ zzoz/SZ/80
00'0 L9'L66'Z 49'L66'Z oS8'bb£'S£i booz/SZ/OT 0/a000-S Qd 9L-ZO 1/d OIWHH CIIO VWN3 ,LI
booz/Sz/OI 00WId-HSd0 Mal,DN01:ZOZZZSL0ASOO
booz/I/Oi TD7Ai6£i£:QI OSS
COW i0 Qa
00'0 SL'6bZ SL'6bZ OZZ'17T8 booz/SZ/OT 8T0Z/T0/Z0%000'S b££1890#100d VWNd ,LI
booz/Sz/oT ODMI-HddO Mal,ON01:ZOZZZSL03SOO
booz/i/OI bS£Ai6£i£�dI03S
£0/io/z0 QQ
00'0 80'TSO'z 80'iS0'z 010'S8£'oi bOOZ/SZ/Oi 8T0Z/T0/Z0%000'S 60£IS90#100d VWNd ,LI
booz/Sz/OT OOWId-NSdO Mal,ONO'I:ZOZZZSLO.gSOO
890XS8£i£:QI 03S
booz/T/OI £o/i0/90 QQ
00'0 8L'OT8'£ 8L'OT8'£ 09Z'6Zb'ST b00Z/SZ/OT ST0Z/i0/L0%000'S iZ9SSSo#100d VWNd .LI
booz/Sz/Oi 0OWId-213d0 MaLON0'I:Z0ZZZSLodS30
booz/T/oT ZMSS£T£:al 02IS
co/To/so QQ
00'0 bb'6601 bb'660'1 OTL'£L8'£ bOOZ/SZ/01 8106/10/90%000'9 SbSSSS0#100d VWNd 11
booz/SZ/oT 03WId-HHd0 WHaL ONO'T:ZOZZZSLOdSOO
booz/T/Oi 9MHXS8£T£:41 OAS
£O/I040 OQ
00'0 8S'L£T 8S'L£T Oz£'9£S bOOZ/SZ/01 8T0Z/T0/S0%000'S £Sb999011100d VWNd 11
booz/SZ/OI 00M-113W WHH.L ONO']:ZOZZZSLOdSOO
bOOZ/i/OT TASMSS£I£:QI OSS
co/Io/£0 Qa
00'0 OT'LZ£'I OT'LZ£'T Ob9'6SO'S bOOZ/SZ/01 SI0Z/I0/b0%000'S £9£9SS0#100d VWNd .LI
booz/Sz/Oi 0OWId-X3d0 MaL ONO1:ZOZZZSLOdSOO
booz/I/oi SbZAb8£T£:QI03S
00/To/LO IJQ
00'0 16'019 16'019 oSS'95;0'£ b00Z/SZ/0I STOZ/TO/90%000'9 ISbS£90#10Od VWNd ,LI
booz/Sz/Oi 00M-NSW Mal,ON01:ZOZZZSLOdSOO
bOOZ/i/01 0M3a£8£T£:QI OSS
66/i0/60 QQ
00'0 96'SZ9 96'8Z9 OZL'OOS'bz VOWSZ/01 biOZ/10/60%000'9 61,960So#100d VWNd ,LI
=` ';-. 14 � ., <•1 `� ,Tiic.rFt+I.:...'P;1. $$ L _ , :` S ?: _� ,r :.i",+ Q(; �•'3a�(�,`F}t!-. ��TM`` °�1Q0 d. �8 �i.w ,:�.{
j:.. � iti I 1 7 ..Iiy2�?.VY ��!S� Y .:fi-r`«: .J. '':.:5::4 K�n y5_. -„+1 f"..� 2 �`� .C.tea, :..7i.' - tl�r 3' 'l t .'��1'`,�x�, �j. .,i.71.....-•.(M1 'c.., 1?! � �.: - r. <'• ,i1.4t "F 1 �'r' i y.. J f �(i`� 4 ,!
...{ � `,� 'c"S,T ���+�'Tvi�!Y '-'`^"^�:� l;,y.•. '�'^Fz .+ .r'�'�:T �'r .A�**����w•�Y.'ti� � � S.`S ,a-'.r.�.4*+ a.TY���*�, zr„��r7'�� r,«�S3� -K.. ��w
_ � �t- -?,�. ..r-. ^e K:•.R .4 rz _ :.}. Y i >y ��� .i,•'si-d:..... 7i.. �j' .�; i., ,4z'.;?.
rNJ:>`{:,-�1 � ,� r x. ga:'r�,��}c.n �.,i'7.5 .:5?�3. ' �,n a``"3' .I r J 4.?G,�.. .�}�•?�s' tEw;'(;.t R .t :.f� .;_i .f.,+T' .;r. - ii�"�.. it :r�4..a! f tS� r if�,'�-•Ct"s-' � .�, 'i� a,. ,t tt'^"11' t�. r.. - ::r c r� •s s"�iST�',�i.: �: } .�; :.r. -C.
_ K:Ti `$"��� .�im�x.� i+lt,.,..t. �t.>?'_ :,8;..( .Iw. :' .r.ri1. _.ae.ti�.i }.Ss����,� .`l? ..�..n"?it;h ,�tf?" -.,.+2f:�., i'•,�..'1�'k��� �Q.�P.�r:+7'�. .r-,,E. -tf_-.,u� .���I�f,.���>�j,�. .cl[.5:�_e� �.Y,,Ti:;7.,K`"+�-;.
F60(0 rVMd 'sn;M 10OOZ/6Z/OT - vOOZ/T/01 ❑❑❑❑❑❑❑❑❑❑❑mm4d.LVQI105N00-aSOO
asn :Aouaunp asus A.To2gpC) uopausu81y Aq papodag
uo1jaw �
aM :GI uodax Os;aQ U014089uw f,
L£
ipuagXloM LSd Wd0V Z1 Z b00Z/8/1 I
b00Z/sZ/ol OOWId-S:RdO M31 9N01:Z0ZZZ9L0dSOO
boot/i/ot EZOsoObiE:0l03S
Eo/Io/so 00
00'0 9Z'ZE6'Z 9Z'Z£6'Z oob'ZSo'Li b00Z/SZ/0I SIOZ/10/90%000'9 6889690#100d VWNd ILI
vooZ/SZ/Oi OOWId-SEdO M310NOI:ZOZZZSLOdSOO
b00Z/i/Oi OAHSOObI UCII 03S
EO/IO/so Go
00'0 b6'£88 b6'£88 oL£'IOI'S b00Z/SZ/0I 8IOZ/10/90%000'9 ZSSS690#100d VWNd LI
tool/sZ/oi O3WId-S3d0 Mal ONO'I:ZOZZZSLOdSOO
b00Z/i/O i t,LAd 00b l E:Ol 03S
Eo/TO/EO ca
00'0 6£'8Lb'Z 6£'8Lb'Z oZ0'bS8'L b00Z/SZ/01 8I0Z/I0/E0%000'5; bE8E690#100d VWNd LI
b00Z/SZ/01 OOWId-SSdO M31 ON01:ZOZZZSLOdSOO
b00Z/T/OI somo0bi E:Ql O3S
EO/i0/SO QQ
00'0 bZ'ZSE bZ'ZS£ 0bL'6L£ boOZ/SZ/0I 8I0Z/I0/S0%000'S 6SS6890#100d VWNd yl
boOZ/SZ/Oi 00WId-83clO M310N01:Z0ZZZSL03S00
b00Z/I/Ol 613fO0bIE:GI O3S
EO/10/90 Oa
00'0 8817£b 88'b£b 019'009 b00Z/9Z/0I SIOZ/I0/90%000'9 6£L8890#100d VWNd It
boOZ/SZ/OI OOWId-ZlSdO M21ON01:Z0ZZZSL0dS0O
b00Z/i/Oi LHdd00bIE:0l03S
£0/io/Eo QQ
00'0 Ib'£60'1 I17'E60'I OE8'bLs'I b00Z/SZ/0I 9IOZ/i0/£0%000'9 SIE9890#100d VWNd ILI
boOZ/SZ/OI O0WId-H3d0 WE310MCI:ZOZZMUS00
b00Z/T/Oi ZZM3o0bi£cll03S
co/To/ZO QQ
00'0 Zb'LZI Zb'LZI ObZ'£9b bOOZ/SZ/oi SIOZ/10/ZO%000'9 999S890#100d VWNd 'Ll
vooZ/SZ/oi O0WId-N:Rd0 M31ON01:ZOZZZSLOdSOO
b00Z/I/oi LH0300biE:Ol03S
EO/io/£o 00
00'0 bL'9£L bL'9£L Ob6'19Z'E b00Z/SZ/0I SIOZ/I0/EO%000'S OOZ9890#100d VWNd ZI
boOZ/sZ/Oi O3WId-N3d0 MM 0N01:ZOZZZSL0dSO0
b00Z/T/OT INE000171E:QI03S
£o/IO/So 00
00'0 L8'IIE'T L8'II£'I OE£'bbI'b bOOZ/SZ/01 8IOZ/I0/90%000'9 806b890#'IOOd VWNd LI
OSeg asBg aseg .red/saxe1qS aseg wp(j papodag uoF:tdFiasa(j adSl
ssoq/upt) jam 3unourV 4soo aou 04eQ apPas uujI.
a;eQ apesy
F6OO 1vNla :snje4S 'b00Z/6Z/0T - VOOZ/T/OT uu❑❑❑❑❑❑LL L Z:.!:031VOI10SNoD-0SOO
QSII :6ouassn3 aseg Ajo2apo uoip7asuvi L Aq papodag u01jaw '
aMH :QI liodag IpjaQ u011aiesue. 'L
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATE DaU2 0 00 00000❑CO 10/1/2004 - 10/29/2004 Status: FINAL
�Nab`
IT FNMA POOL#0697026 5.000%05/01/2018 10/25/2004 484.010 92.05 92.05 0.00
DD 04/01/03 10/1/2004
SEC ID:3140OTLF2 10/25/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL40702210 5.000%05/01/2018 10/25/2004 1,474.320 876.24 876.24 0.00
DD 05/01/03 10/1/2004
SEC ID:31401ADP9 10/25/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0702328 5.000%05/01/2018 10/25/2004 1,955.760 541.41 541.41 0.00
DD 04/01/03 10/1/2004
SEC ID-31401AHD2 10/25/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0709148 5.000%06/01/2018 10/25/2004 1,891.100 1,102.84 1,102.84 0.00
DD 06/01/03 10/1/2004
SEC ID:31401 HZM7 10/25/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0709360 5.000%07/01/2018 10/25/2004 16,381.090 2,584.47 2,584.47 0.00
DD 06/01/03 10/1/2004
SEC ID:3140IJB56 10/25/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0709826 5.000%06/01/2018 10/25/2004 1,559.120 432.18 432.18 0.00
DD 06/01/03 10/1/2004
SEC ID:31401JSP4 10/25/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0709917 5.000%06/01/2018 10/25/2004 3,594.980 913.45 913.45 0.00
DO 06/01/0 3 10/1/2004
SEC ID:31401JVJ4 10/25/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0709963 5.000%06/01/2018 10/25/2004 75.450 75.84 75.84 0.00
DD 06/01/03 10/1/2004
SEC ID:31401JWY0 10/25/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0710235 5.000%06/01/2018 10/25/2004 4,462.920 2,428.40 2,428.40 0.00
DD 06/01/03 10/1/2004
SEC ID:31401103C8 10/25/2004
OCSF07522202:LONGTERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
38
6£
WuagX-joM ,LSd WdOC ZIZ POOZ/8/II
b00Z/SZ/OT OOMd-2I3dOM3,LONO'i:ZOZZZSLOdS30
b00Z/T/O T 6d t'S ZOM C:CII 03S
EO/TO/Oi QQ
00'0 9T'TOL'Z 9T'TOL'Z OLZ'9Eb•'t i, t OOZ;/SZ/0T STOZ/TO/OI%000'S OETL£LO#'IOOd VWN.d .LI
b00Z/SZ/OT OOWId NSW K831 ON0'1:ZOZZZSLO,dSO0
b00Z/T/OI SNAWZObi£:Q1 OSS
£0/TO/OT QQ
00'0 b6'8CT b6'S£T O80'S£T b00Z/SZ/01 8IOZ/TO/TT%000'S EL8Z£LO#100d VWN.d Z1
b00Z/SZ/OT OOMd-218dO M31ONO'I:ZOZZZSLOJSOO
tiOOZ/T/OT £M2IHZObT£:QI OSS
co/To/LO QQ
00'0 86'6Z9`1 S6'6Z9'T ObL'Z86'9 bOOZ/SZ/OI 8TOZ/TO/LO%000'S T096ZLO#'IOOd VWN.d LI
b00Z/SZ/Oi OOMd-213dO KSSIONO'I:ZOZZZSLOdSOO
b00Z/T/Oi tiaXVZOtiTE:QIOsS
£0/TO/90 QQ
00'0 b8'IL6 b8'TL6 OST'ES6 b00Z/SZ/OT STOZ/IO/90%000'S L817EZLO#'I00d VWNS .LI
b00Z/SZ/OT OOMd-SEdO KH31 JNO'I:ZOZZZSLOdSOO
�OOZ/T/OT t,MAXTObi£:QIOZS
£0/10/90 QQ
00'0 99'Z61'1 99'Z61'I 0£Z'909'Z b00Z/2Z/01 BTOZ/TO/LO%000'S 6Z91ZL0#'1O0d VWNd ZI
b00Z/SZ/OT OOMd-S3dO YiSSL CJNO'I:ZOZZZSL03SO0
ONCMIOt,T£:QI 03S
b00Z/1/01 co/To/90 QQ
00'0 88'8LS'8 88'8LS'8 09S'L6Z'6b b00Z/SZ/01 81OZ/T0/90%000'S 69£OZLO# IOOd VWN9 .LI
b00Z/SZ/OT OOMd-NZdO M3,L ONCn;ZOZZZSLOdSO0
ti00Z/i/OI St,OMIObT£:QI OHS
£01101LO QQ
00'0 Eb'95;6'Z £b'986'Z OOS'9bb'£ bOOZ/SZ/OT STOZ/TO/LO%000'S 61£0ZLO#7O0d VWN.d ,LI
b00Z/SZ/OI OOWId-SadO MSL OMO'I:ZOZZZSL03SOO
b00Z/i/OI TSaNTObT£:QIO3S
£0/TO/LO QQ
00'0 90'890'T 90'890'T OtZ'6L8'b b00Z/SZ/OT STOZ/TO/LO%000'S 99££TLO#'1OOd VWN3 .LI
VOOZ/SZ/OT OOMd-S3dO W2I2.I ONO'I:ZOZZZSL09SOO
b00Z/T/O T Z SdM ME C:QI 03 S
£0/10/90 QQ
00'0 ZZ'99 ZZ'99 OTZ'TL VOOZ/SZ/OT STOZ/TO/90%000'S bb£ETLO#'IOOd VWN,dcot
LI
Er,
MR_ r"" ..Fga��T �?}} ��,.» Cr4•'i: C;YS� -i����Q •� �•.: d .. ......n .. ,3'('YaA. �... .K:. Sj - �.11f�S.�; r?C' :.F.-:.-?Sµl� �`: � f�. ��. 'f" -�' �3"'�`-i2v. -
:`X';:.�rPS$,r,'�7-Sk-a ty'-G:y. te.�a2'x � _:M". k� �_.KT� �[f �i' �- 'a'a' ;:t�s „�".�.*� ':•4`,2:Ar"a., {�s3z ;�{: r' �,. ,«i .a,ry..c w}i `4` „_�.-'�'Z'`.
b z�, a:;::� �,,�.. ., .�c., • :� „�. �• a c.'* 4-c� ~~� �� .�'����. :_� t n<. i•;i--T ��,` ��i. ��c,� µr>;Y � '-''�. +�5'>?:^' ,�,i,
.�;r-v.�:r'mr����� t-.;:;,,�,.a.i'-'N� _ ,: --.. �;,•:� •�,: «i;:::s.:.�::.;;�u�+ ?',.^ ,s;r::. ;i ��Irr'�,.5 -' �;,.�'•$� �.',�_.� ,��Z ' r;F-...>... !:t�t €r�t�;,•,,.
'ivSI3 :�u�s 'b00Z/6Z/01 - 'b00Z/T/01 ❑CC❑❑C❑❑cc:❑3=Q2.LV(II'IOSNOO-QSoo
asn :Aouajzn3 eSBg Ajo2apC) uoi;assusis Aq papodag U01 je
600Sm3 :�:padag uspa uo14oBsuesy if 11
ot,
youagxloM
LSd WdOC ZVZ 600Z/8/I I
b0oz/SZ/Oi OOWId-NSW K821 ONO'I:ZOZZZSLOdSOO
b00Z/i/OI 6HNJ£ObIE:QI03S
£O/I0/60 OQ
00'0 8z'8b8 8Z'8b8 OZ6'6ZL'£ WOZ/SZ/Oi 8IOZ/10/80%000'S 00b8bL0#100d VWNJ .LI
b00z/Sz/Oi OOWId-N3dO M3.LON0'I:Z0ZZZ9LOdSOO
OX£.d£ob i E:QI 03S
booz/I/oi £0/I0/11 Q4
00'0 8£'Lib'I 8£'LIVI 090'6L8'1 bOOZ/SZ/0I 8IOZ/10/I1%000'9 bI6LbL0#1OOd VWN3 .LI
vooZ/SZ/OI OOWId-N3d0 M310N0']:Z0ZZZ9L0.4SO0
booz/i/oi bzEBEobi£:at03S
£O/I0/60 aQ
00'0 9L'6£9 9L'6£9 08£'iIb'£ bOOZ/SZ/OI BIOZ/I0/60%000'5; 91£bbLO#'100d VWNq 11
booz/SZ/oi OOWId-NSdO MZI ONO'I:ZOZZZSL03SO0
vooz/i/0I bS2IH£Obi£:QI 03S
£O/10/60 Q4
00'0 0£'890'b o£'890'b OL6'840'S "OUSZ/OI 8IOZ/IO/LO%000'S 800bbLo#'I00d VWNd 1d
b00z/Sz/OI 0OWId-N3d0 M310NO'I:Z0ZZZ9LOdSOO
b00Z/i/OI I NWH£Obi£:QI 03S
£O/10/01 QO
00'0 6Z'95;I 6Z'9Si Obb'OS8 bOOZ/SZ/01 8IOZ/I0/II%000'S 898£bLO#'IOOd VWNd .LI
tooz/Sz/Oi 0OWid-N3d0 MaLONO'1:ZOZZZSLogSOO
boot/i/OI LHSMZObi£:QI 33S
£O/10/1I QQ
00'0 LI'90I'£ LI'90i'£ O8b'6Eb'£ b00Z/SZ/0I 8IOZ/10/01%000'S 8bLObLO#'IOOd VWNq d.I
booz/SZ/Oi OOWId-2I3dO Mal ONO'I:ZOZZZSLOgSOO
b00z/I/Oi 0WAZObi£:QI 03S
EO/IO/OI QO
00'0 8Z'LOS'z 8z'Lo8'z 0£b'I06'Z 17007,/SZ/01 SIOZ/10/01%000'S ILbObLO#'IOOd VWNd ILI
booz/Sz/oi 0OWId-N3dO KHZI ONO'I:ZOZZZSLOdSOO
b00z/i/0I ZONIIZobi£:aI O3S
£0/I0/01 QO
000 Lb'8LL Lb'8LL OLI*SL6'Z bOOZ/Sz/OI SIOZ/10/0I%000'9 L808£LO#'I00d VWNd .LI
b00Z/SZ/OI 03WId-?I3d0 MZL0N0'I:Z0ZZZSL08SOO
b00z/i/OI zaQflzobi£:QI 03S
£0/i0/oi co
000 N*LSCF OZ'LSI'z OOS'iSb'Z booz/Sz/Oi 8IOz/10/01%000'S iiz8£L0#'I0Od VWNd .LI
asea assa aqua and/salegs asua a;r(I papodag uopdposaa odAL
ssoZ/utu) 43N }unourV 4soo aotjd a;sa auras uua,L
0413a apgsy
F6OO'IVNI3 :snle3S t00Z/6Z/0T - VOW I/OT UU❑UUUUU11006Ha3.LVaI'IOSNOD-aSOO
QSn :6auaun0 asug Ajo2ajuo uopausui;i1, Aq popodag
HM3 :QI�oda2i �iL'�aQ u0i40Esuvj j, U01 1a ,
ib
youagx�oM JSd WdOC ZFZ b00671911 T
boOZ/91/0I OOWId-N3dO M&LON0'I:ZOZZZSLOdSOO
b00Z/T/Oi £ZOf190Z9£:al oss
96/10/b0 as
00'0 b6'89 b6'89 Ob£'6b£ bOOZ/9I/01 9ZOZ/ST/b0%009'9 68EIZb0#'I00d VWNO .LI
b006/Sz/OT OOWId-SEdO KNSd,ONO'I:ZOZZZSLOdSOO
b00Z/I/OT SNI'SEMIT£:aI oss
co/To/TT as
00'0 6Z'918'£ 6Z'ST8'£ OZ6'8b9'6 b00Z/SZ/01 STOZ/I0/Ti%000'S ZL£9SL0#'IOOd VWNd ,LI
vow/Sz/OT OOWId-2I3dO M31 ONO'i:ZOZZZSL03SOO
b00Z/T/OT £V9a£Om ucil 02S
WWII QQ
00'0 9T'9Sb'Z 9T'9Sb'z 080'£62'Z boOZ/SZ/OT SIOZ/TO/ZT%000'S S9ISSL0#'I00d VWNd ZI
booz/Sz/OT OOWId-NHdO M31ON0'I:6OZZZSLOdSOO
£ZVNEObI£:al O3S
booz/T/OT WWII QQ
00'0 ZS'L6b'£ ZS'L6b'£ ObZ'60S'£ bOOz/SZ/OI STOZ/TO/TT%000'9 Szb£SLO#'IOOd VWNd .LI
booz/SZ/OT OOWId-S3dO MS1ONO'I'.Z06ZZSL03SOO
b00Z/T/Oi I HW'I£ObT£:aI O3S
£O/TO/TT as
00'0 £8'EI£'£ £8'£I£'£ 0£b'968'S b00Z/SZ/OT STOZ/TO/ZT%000'S 09619LO#'I00d VWNq .LI
booz/Sz/OT OOWId-H3dO W221ONO'1:ZOZZZSL03SOO
b00Z/T/OT z3MrEot,T E:aI oss
co/To/TT as
00'0 £9'00L £9'OOL 09I'OOL b00Z/SZ/OT 8TOZ/TO/TT%000'S SbbOSLO#'IOOd VWNd LI
booz/sz/OT OOWId-H3dO Mal,ONO'I:ZOZZZSLOdS00
booz/T/OT 9anr£obT£:aIoss
co/To/TT as
00'0 Zb'OSS'L Zb'Os8'L OTL'6£S'S bOOZ/SZ/OI 9TOZ/TO/TT%000'S 08£OSLO#'IOOd VWNd II
booz/Sz/OT OOWId-NHdO M21 ONO'I:ZOZZZSLOdSOO
booz/I/Oi zVnr£ObT£:QI33S
co/IO/IT QQ
00'0 T£'zis'8 T£'zT8'8 OZO'09T'Zb bOOZ/SZ/OT SIOZ/TO/TT%000'9 LL£OSLO#'IOOd VWNd ,LI
booz/Sz/OT OOWId-2I3d0 M31ONO'I:ZOZZZSL03SOO
O'ILO£ObT£:al 33S
booz/T/OT WWII II as
00'0 b9'8z8`£ b9'SZS'£ OZT'9bI'b booz/SZ/OT STOZ/TO/ZT%000'9 6689tLO#'IOOd VWNd .LI
c
r.i=Y.'."£r1��9..c�.':',+�•�hs¢' —�;:i;�ilfk-+{p-f3?.'�.�.�.��,F 7 �_n8., dY-,..:.-.:_;....:i.'fi'!9 C1,4��''—_�^—>-fc�_x't+��ii':.+'1-Z``;rrt-..�•::,.:-,�y.X•';;r».;=`.,.}.'�Tf/S.}(1t-1+_<-m�-1cr":.r��i:�-:.`:^:.,1:rR a.�'�z�r+��'{.�,,•�_'1...��.*:r..-.",v`'t^^v S_4"•?..�:���.�??1.'-1.'...r�"±.l t:.-Y'.:rP J s.,�'J=k
'L`i t IY t�.;. '.x�i'''F�t,.i.��"s}��tr.`_�:•.Y�..<i.{�.k}�•9-yGteF g3"�,iS. Tilt
e. 0`§%���•,'��L<r,5-
.j'..Ti-L.i.�:'-:;-?1.`.S.L'w'�!k.,{3�±�Tx'�.a�.{5.°.1r.,'io.{?':�.a}C 7 acf Y»l s.?:.-�L>Rs ji,�•'i.,'�a�7`.ta.,�e;z1�a•R. y•t.�Y...a•
_:'•=`:,
'Ss
.. .. �a. ...1.ye... , .�'�.+i�::M1:=`-,:.,.- 1v.. .`e� :'�i:1 �•si.�:'�s1;ak't�drr _��i •S.+L�#'r..Y.i�W-.->.,.:�..'�t�"'�-' �::�}�".fa�.:�i'�'v '...`4�Y'�Y....�_f'�rsr-'t'+. :`?i ii •�t 4L..�+fiYLr. >T
ZvbII� 1OOOZ/bZ/OT - 11OOZ/T/0T ❑❑❑❑❑❑❑❑OOCZ=a3,LVQI'IOSNOO-aSOO
asa :souamu3 asug faoBapo uoTjo8su8,zy Aq papodag U01jew
600sma :a>< �axt 11s4aQ uopousulu L
Fe
Transaction Detail Report ED: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D=0 00 000DE1000 10/1/2004 - 10/29/2004 Status:-FINAL
•
%mow
7;-V 41
IT GNMA POOL#0449851 6.5009/o01/15/2028 10/15/2004 39.500 108.01 108.01 0.00
DD 01/01/98 10/1/2004
SEC ID:36208FWL0 10/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0466845 6.500-/.06/15/2028 10/15/2004 50.870 198.64 198.64 0.00
DD 06/01/98 10/1/2004
SEC ID:362093TA6 10/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0468052 6.5000/.07/15/2028 10/15/2004 211.470 604.06 604.06 0.00
DD 07/01/98 10/1/2004
SEC ID:36209C5M4 10/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0476041 6.500%06/15/2028 10/15/2004 7,954.720 836.12 836.12 0.00
DD 06/01/98 10/1/2004
SEC ID:36209MZE7 10/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0478626 6.5009/601/15/2029 10/15/2004 186.220 656.38 656.38 0.00
DD 01/01/99 10/1/2004
SEC ID:36209QVT9 10/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0480598 6.500-/. 10/15/2028 10/15/2004 38.560 156.49 156.49 0.00
DD 10/01/98 10/1/2004
SEC ID:36209S3F)6 10/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0512235 6.500-/. 11/15/2029 10/15/2004 12.370 45.66 45.66 0.00
DD 11/01/99 10/1/2004
SEC ID:36211 GBC6 10/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL 00514326 6.500%07/15/2029 10/15/2004 350.960 578.86 578.86 0.00
DD 07/01/99 10/1/2004
SEC ID:3 6211 JLF2 10/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA H POOL#0080023 VAR RT 12/20/2026 10/20/2004 4,178.500 670.11 670.11 0.00
DD 12/01/96 10/1/2004
SEC ID:36225CAZ9 10/20/2004
OCSF07522202:LONG TERM OPER-PEMCO
111812004 2:12:30PM PST Workbench
42
Transaction Detail Report M: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATED=0 110 0000013C0 10/1/2004 - 10/29/2004 Status: FINAL
'M hi
ja W
"
m
BIM
IT GNMA 11 POOL#080088M 7.375%06/20/2027 10/20/2004 8,674.030 662.92 662.92 0.00
DD 06/01/97 10/1/2004
SECID:36225CC20 10/20/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA 11 POOL#0080395 VAR RT 04/20/2030 10/20/2004 8,382.280 556.52 556.52 0.00
DD 04/01/00 10/1/2004
SEC ID:36225CNM4 10/20/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA 11 POOL#080408X 6.500%05/20/2030 10/20/2004 49,005.680 5,011.39 5,011.39 0.00
DD 05/01/00 10/1/2004
SECID:36225CN28 10/20/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA U POOL#0080900 VAR RT 05/20/2034 10/20/2004 2,930.860 949.05 949.05 0.00
DD 05/01/04 10/1/2004
SECID:36225DAA2 10/20/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA 11 POOL#0080965 VAR RT 07/20/2034 10/20/2004 9,582.510 4,068.21 4,068.21 0.00
DD 07/01/04 10/1/2004
SEC ID:36225DCB8 10/20/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GOLDMAN SACHS GRP MTN#TR00194 VAR RT 10/27/2004 3,500,000.000 16,368.33 16,368.33 0.00
10/27/2006 DD 10/29/03 10/27/2004
SEC ID:38141 EJB6 10/27/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GOLDMAN SACHS GRP MTN#TR00207 VAR RT 10/25/2004 0.000 4,136.00 4,136.00 0.00
07/23/2009 DD 07/23/04 10/23/2004
SEC ID:38141F.JQ3 10/25/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA GTD REMIC TR 2000-9 FH VAR RT 10/18/2004 13,509.440 1,028.55 1,028.55 0.00
02/16/2030 10/16/2004
SEC ID:3837H4NX9 10/18/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT PACIFICORP SECD MTN#TR 00115 7.3000/6 10/22/2004 3,000,000.000 31,025.00 31,025.00 0.00
10/22/2004 DD 10/22/92 10/22/2004
SEC ID:69512EEU5 10/22/2004
OCSF07522202:LONG TERM OPER-PIMCO
111812004 2:12:30PM PST Workbench
43
Transaction Detail Report m: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D=2❑00000❑❑O❑O 10/1/2004 - 10/29/2004 Status: FINpl,
Cf may' }�w yN.^+'.... r- a� s .>.�.. ,,i. M•' .n+ w.
t's�"f Marv. ;• �.�_ �� �!.{x 5<,C...�„ .� �W,� ,�� y � ..` �� .��,- r �� ..��RX "�.•�»�: „lr �: =T -
.rs'y� .»r F � �- `a' a-"'I��,,; '..F 1^ .•-.r �.-v � ire $ .'+^•, ••�i
/'��! �.�.v s�.',C .. �a�'• `� ., '' a..� '�'� �� IS .Y, .1+u:.0 r. 'c.`. a„}!± �r.,a ,C•c L��f�� s * a, _
� �+....-...i... :.:,r rM���• -r �i� ..._1p1'wb�r�a ��....�t�. t� �� � _ -j.Y't`r � �R .r � z•
of .
IT RESIDENTIAL ASSET 03-RSI 1 AIIB VAR RT 10/25/2004 35,564.470 1,323.63 1,323.63 0.00
12/25/2033 DO 12/30/03 10/25/2004
SEC ID:760985K83 10/25/2004
OCSF07522202:LONG TERM OPER-PIMCO
CD US TREASURY INFLATION INDEX NT 3.375% 10/29/2004 0.000 7,700.00 7,700.00 0.00
01/15/2007 DD 01/15/97
SEC ID:9128272M3 10/29/2004
OCSF07522202:LONG TERM OPER-PIMCO
CD US TREASURY INFLATION INDEX NT 3.625% 10/29/2004 0.000 1,620.00 1,620.00 0.00
01/15/2008 DD 01/15/98
SEC ID:9128273T7 10/29/2004
OCSF07522202:LONGTERM OPER-PIMCO
CD US TREASURY INFLATION INDEX NT 3.8759/6 10/29/2004 0.000 6,890.00 6,890.00 0.00
01/15/2009 DD 01/15/99
SEC ID:9128274YS 10/29/2004
OCSF07522202:LONGTERM OPER-PIMCO
TOTAL FIRED INCOME SECURITIES U.S. DOLLAR 8,797,985.180 270,827.91 270,827.91 0.00
TOTAL FIRED INCOME SECURITIES BASE: 8,797,985.180 270,827.91 270,827.91 0.00
TOTAL INTEREST BASE: 12,097,985.180 278,746.36 278,746.36 0.00
TOTAL TRANSACTIONS: -3,515,231.230 -15,362,975.46 15,806,048.59 -414,363.42
I1/8/2004 2:12:30PM PST
Workbench
44
FAH R COMMITTEE Meeting Date To Bd. of Dir.
11/10/04 11/17/04
AGENDA REPORT Item Number Item Number
FAHR04-97 14(c)
Orange County Sanitation District
FROM: Gary G. Streed, Director of Finance
Originator: Michael D. White, Controller
SUBJECT: QUARTERLY INVESTMENT MANAGEMENT PROGRAM REPORT FOR
THE PERIOD JULY 1, 2004 THROUGH SEPTEMBER 30, 2004
GENERAL MANAGER'S RECOMMENDATION
Receive and file the Quarterly Investment Management Program Report for the period
July 1 . 2004 through September 30, 2004.
SUMMARY
Section 15.0 of the District's Investment Policy includes monthly and quarterly reporting
requirements for the District's two investment portfolios. These two funds, the "Liquid
Operating Monies," and the "Long-Term Operating Monies" are managed by PIMCO,
the District's external money manager.
The ongoing monitoring of the District's investment program by staff and Callan
Associates, the District's independent investment advisor, indicates that the District's
investments are in compliance with the District's adopted Investment Policy and the
California Government Code, and that overall performance has tracked with benchmark
indices. In addition, sufficient liquidity and anticipated revenues are available for the
District to meet budgeted expenditures for the next six months. The District's portfolios
do not include any reverse repurchase agreements or derivative securities.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
Not applicable (information item)
H TdepttagendaTFAHRTFAHR2 00411 1 04\04.97 Ortly Investment Report doc
Revised 8/20198 Page 1
ADDITIONAL INFORMATION
Performance Reports
The Quarterly Strategy Review, prepared by PIMCO, and the Investment Measurement
Service Quarterly Review. prepared by Callan Associates, are attached for reference.
Also attached are Long-Term and Liquid Operating Monies Summary of Performance
Data and Portfolio Statistics charts that depict the performance results, estimated yield
and duration, credit quality, and sector diversification of the District's portfolios, as of
July 1, 2004 and September 30, 2004. The Liquid Operating Monies portfolio, with an
average maturity of 90 days, consists entirely of cash equivalent investments such as
U.S. Treasuries and corporate discount notes.
Portfolio Performance Summary
The following table presents a performance summary of the District's portfolios as
compared to their benchmarks for the period July 1 through September 30, 2004.
Portfolio Performance Summary
Quarter Ended September 30,2004
Liquid Operating Monies(%) Long-Term Operating Monies(%)
Total Rate Total Rate of
of Return Benchmark(" Return Benchmark"'
3 Months 0.35 0.32 1 56 1.69
6 Months 0.61 0.56 045 -0-05
9 Months 0.87 0.80 1 98 1.61
12 Months 1.13 1.04 2.22 1.75
Since inception 30 Sept 95 4.36 3.91 6.19 6.12
Market Value S72.8M S363.1 M
Average Quality "AAA AAA"
Current Yield(%) 1 9 3.5
Estimated Yield to Maturity(%) 1 8 3.1
Quarterly Deposits(Withdrawals) S(40 0)M S(31.0)M
Estimated Annual Income Sl AM S12.5M
(1) Benchmarks:
• Liquid Operating Portfolio: 3-Month Treasury Bill Index
• Long-Term Operating Portfolio: Merrill Lynch Corp/Govt. 1-5 Year Bond Index
Portfolio Market Values
Comparative marked-to-market quarter-end portfolio values are shown in the following
table, and in the attached bar chart.
Liquid Long-Term
Quarter Operating Operating
Ending Monies ISM) Monies($M)
31 Dec.03 91.4 386.8
31 Mar.04 91.6 392.7
30 June 04 112.4 388.4
30 Sept. 04 72.8 363.1
H WeptlagendaTAHR1FAHR2004t1 1 04104-97 Only Investment Report doc
Revised 8/20198 Page 2
District's Investment Account Balances as of September 30, 2004
i
Book Balances Estimated
Investment Accounts September 30, 2004 Yield (%)
State of Calif. LAIF $ 26,710,595 1.77
Union Bank Checking Account 1,739,035 1.47
PIMCO—Short-term Portfolio 72,521,951 1.80
PIMCO-Long-term Portfolio 360,837,599 2.97
Petty Cash 4,000 N/A
TOTAL $461.813.180 2.71
Debt Service Reserves w/Trustees $ 62.476.515 3.05
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. Historical Yield Curve Graph
2. PIMCO Quarterly Report
3. Quarter End Portfolio Market Value Bar Chart
4. Summary of Performance Data and Portfolio Statistics — Liquid Operating Monies
5. Summary of Performance Data and Portfolio Statistics — L-T Operating Monies
6. Investment Transactions and Balances in LAIF
7. Asset Summary by Asset Type — Liquid Operating Portfolio
8. Asset Summary by Asset Type — Long Term Portfolio
9. Investment Listing of Liquid Operating and L-T Portfolios (Yield Analysis Report).
10. Callan Report (separate bound document)
11. PIMCO Report (separate bound document)
H.ldept4agenda\FAHR\FAHR2004%1 1 04504-97Artly Investment Report.doc
Revised 8120/98 Page 3
P I M C 0
840 Newport Center Drive
Suite 100
Newport Beach,CA 92660
Tel: 949.720.6000
Fax:949.720.1376
October 27, 2004
Mr. Mike White
Controller
Orange County Sanitation District
10844 Ellis Avenue
Administration Building
Fountain Valley, CA 92708-7018
Re: 3rd Quarter 2004 Report
Dear Mike:
The following is a description of events in the bond markets during the 3`6 quarter of 2004 and an
analysis of the strategies undertaken in the Orange County Sanitation District's long-term and liquid
portfolios over the period. We have also included a section on strategies to be pursued in your portfolios
during the coming months.
Bond Market Recap:
Bond Markets Rally As Soft Economy Prompts Fall In Rates
Bonds rallied in the third quarter as the economy slowed, hitting what Federal Reserve Chairman
Greenspan called a "soft patch." Weak employment growth and expectations of lower inflation prompted
a fall in interest rates that boosted all bond market sectors. The third quarter was essentially a reversal of
the previous three months, when a stronger labor market and anticipation that the Federal Reserve would
begin tightening caused rates to jump.
Bond market gains during the third quarter came despite two 25 basis point rate hikes by the Fed that
brought the fed funds rate to 1.75 percent by the close of the period. The central bank said it would raise
rates in the future at a "measured" pace as it moves toward a neutral policy stance that neither restrains
nor stimulates the economy.
The Lehman Brothers Aggregate Bond Index, a widely used index for the high-grade bond market,
returned 3.20 percent in the third quarter. As shown in the chart above, the yield on the benchmark 10-
year Treasury fell 46 basis points during the quarter, ending the period at 4.12 percent. The yield on the
I0-year Treasury moved below 4 percent in September before the benchmark note gave back some gains
at the end of the period. While all but the very shortest maturity yields fell during the quarter, 10-year
yields fell the most, causing the 2-10 year portion of the yield curve to flatten. This flattening suggested
that bond markets were not optimistic about the economy's growth prospects.
A major reason for bond investors' skepticism about future growth was higher oil prices, which topped
$50 a barrel late in the period and rose by more than a third for the full quarter. Consumer confidence
slipped in September for the second consecutive month amid concern that surging oil prices would
continue to exert a drag on growth, hiring and disposable incomes.
Higher Yielding Bond Sectors Outperform In Third Quarter
The following summarizes fixed income sector returns:
■ Mortgages outperformed like-duration Treasuries during the third quarter of 2004. Mortgages
benefited from continued strong demand from banks and other financial institutions for "carry", or
the excess yield mortgages provide above borrowing costs. Declining volatility in financial markets
overall convinced investors that there was minimal risk of adverse price movements that could offset
mortgages' attractive cant'.
■ Investment grade and high yield corporate bonds outpaced Treasuries during the quarter. The trend of
improving corporate credit quality proved resilient despite concerns about higher oil prices, Fed
tightening and slower growth. Corporate America's profitability and balance sheet liquidity remained
solid.
■ Real return bonds remained one of the best performing fixed income sectors in the third quarter and
for the full year. Although TIPS faced the headwind of reduced inflation expectations, they still
outperformed comparable duration nominal bonds as real yields fell.
• U.S. bonds generally outperformed other major developed markets in Europe and Japan, though rates
fell in those markets as well.
• Emerging market bonds were the best performing fixed income assets during the third quarter,
rallying strongly after their poor performance in the previous quarter. A more benign Treasury
market, improving country fundamentals and continued strong commodity prices sparked a
tightening of emerging market credit premiums.
Performance Attribution:
Long Term Portfolio
The Long-Term portfolio that P1MCO manages on behalf of Orange County Sanitation District turned in
a 1.56 percent return over the quarter, lagging the Merrill Lynch 1-5 year Government Corporate Index
by 13 basis points.
This portfolio's performance was due in part to the following factors:
• PIMCO's secular outlook calls for limited exposure to U.S. rates and diversification beyond core
bond sectors; thus we avoided exposures that could have paid off during the quarter's rally but posed
longer tern risks
• Held duration below the index given long term risks of inflation and rate increases; this strategy was
negative during the quarter as interest rates fell
• Yield curve positioning similar to the benchmark was neutral for performance
■ A mortgage emphasis added to returns as low volatility and strong bank demand supported these
assets; mortgage security selection was also positive
• An underweight to corporates detracted from returns as credit premiums narrowed; corporate security
selection added value
2
Liquid Portfolio
Q
The Liquid portfolio that PIMCO manages on behalf of Orange County Sanitation District turned in a
0.35 percent return over the quarter,outperforming the 3-month Treasury Bill Index by 3 basis points.
This portfolio's performance was due in part to the following factors:
• Near-index duration was neutral for performance
• An corporate emphasis added to returns as credit premiums narrowed; corporate security selection
added value
• Use of higher yielding securities such as commercial paper and short-term notes contributed to
performance
Economic Outlook:
Global Economy To Muddle Along Over Next Few Quarters
The global economy will muddle along over the next several quarters, with neither a boom nor a bust
likely to emerge. The U.S., Japan and China will grow faster than Europe.A global excess of supply over
demand in labor and product markets, as well as subdued unit labor costs, will restrain inflation. Interest
rates in the U.S. will be range-bound within 30-40 basis points on either side of current levels. Important
aspects of the outlook are:
• A Boom Is Not In The Cards... More business investment will be needed to bolster global demand
growth now that fiscal and monetary stimulus is fading.Companies in the U.S. and Japan have ample
liquidity to boost investment after repairing their balance sheets over the last several years,but a lack
of confidence about future growth and lingering excess capacity will subdue the "animal spirits" of
corporate executives. Investment spending and hiring will be more modest than would be expected
given such robust corporate profits and cash flow.
• ...But Neither Is a Bust -- Some growth in investment will be needed just to maintain the capital
stuck of Corporate America, whose current spending is not keeping pace with depreciation. Growth
in consumer spending will remain a net positive,as a modest pickup in hiring will support disposable
incomes. Range-bound rates will keep household debt service at manageable levels.
■ Europe To Lag; Japan a Positive— European exports have responded positively to growth abroad.
Still, the Eurozone will be hampered by a relatively soft consumer sector that is being held back by
anemic growth in employment and incomes. Japan's growth will remain balanced between external
and internal demand now that Japanese consumers have reemerged after a long dormant period.
• Higher Oil Prices Will Restrain Growth — Higher oil prices will also exert inflationary pressure
worldwide. Still, the adverse impact of rising oil prices will be more muted than in the past. Oil prices in real terms are nowhere near levels seen in the late 1970s. Moreover,the world's reliance on
oil per unit of output has been considerably reduced since then.
3
Remain Defensive To Guard Against Potential Instability o
The global economy looks stable, with prospects for modest growth, low volatility in financial markets
and range-bound interest rates. PIMCO remains concerned, however,about a tilt in the direction of either
deflation or inflation. The uncertain pace of investment and hiring could tilt the balance of risks toward
deflation. On the other hand, monetary policy remains stimulative despite the beginning of Fed
tightening. Easy money combined with higher commodity prices and dollar weakness could swing the
economy back in the other direction. A prudent approach in this environment is to stay defensive and
well diversified to avoid negative consequences of being on the wrong side of any market dislocation.
Key strategies will include:
• Tactically Flexible Interest Rate Strategies-- Rates are more likely to rise than fall over a secular,
or three to five year time frame. We will therefore be wary of extending duration beyond benchmark
levels. At the low end of our forecasted interest rate range, we will target duration about 0.5 year
below the index and then shift toward a neutral posture should rates move back up. With European
growth expected to lag the U.S. and Japan, it makes sense to diversify away from U.S. interest rate
risk and take exposure to intermediate maturity Eurozone issues,where permitted.
• Structural Yield Curve Exposure - While short/intermediate maturities are close to full valuation,
we will retain a modest structural emphasis here. Because the short/intermediate portion of the yield
curve remains relatively steep, this "bulleted" posture provides extra yield with less price risk than a
"barbell," or mix of short and long term bonds. In addition, longer maturities would be more
vulnerable if the economy tilted toward inflation.
• Retain Underweight of Core U.S. Sectors —Tight corporate yield premiums offer too little reward
to bear the risk of negative credit events if the economy were to slow. Mortgage-backed bonds are
fully valued for now as a result of unusually heavy demand from banks, which are taking advantage
of mortgages' attractive "carry" in a steep yield curve environment.
• Out-of-Index Alternatives - Better risk/reward trade-offs can be found outside of core sectors. At
current break-even inflation levels, real return bonds continue to provide an effective hedge against
secular inflation risk. Municipal bonds offer attractive yields versus Treasuries on a historical basis
and pose less credit risk than corporates. Improving credit fundamentals and relatively generous
yields make modest exposures to emerging market bonds a compelling alternative to comparably
rated corporate issues.
• Add Extra Return Via Modest Currency Exposure — PIMCO expects the large U.S. current
account deficit to exert downward pressure on the U.S. dollar over a secular time frame. Where
permitted, we will express this view via modest exposure to currencies likely to rise because of
improving economic fundamentals, such as the yen and select emerging market currencies.
Strategy:
The following list highlights the strategies that will be used in the Long Term portfolio in the coming
months:
• Position portfolios defensively;rely on longer-run structural sources of value added to mitigate risks
of instability
4
• Target duration below-index when rates are near the bottom of their range and move toward neutral
e
as they rise
• Retain emphasis on short-and intermediate-maturity issues as they offer structural advantages given
a steep yield curve; these include relatively attractive yields and "roll down,"or price gains as bonds
are revalued at lower yields over time
• Exploit other structural strategies, such as buying bonds forward and investing cash backing these
positions in short maturity issues with attractive yields
• Hold mortgages, which offer a yield advantage over Treasuries and strong credit quality; seek value
in coupon selection
• Underweight corporates, as their full valuations present unfavorable risk/reward trade-offs
The following list highlights the strategies that will be used in the Liquid portfolio in the coming months:
• Position portfolios defensively; rely on longer-run structural sources of value added to mitigate risks
of instability
• Given the steep curve, continue to exploit"roll down,"or price gains as bonds are revalued at lower
yields over time
• Retain modest exposure to corporates in the face of full valuations in this core bond sector
We hope you find this information useful. Please feel free to call us with any questions.
Sincerely,
Christine Telish, CFA John M. Miller, CFA
Vice President Senior Vice President
5
OCSD Investment Management Program
Quarter End Portfolio Values
(Marked-to-Market)
$450,000,000
I �
$400,000,000 —-- --- —-— -- --------
1
$350,000,000 _...._...... -- - - - - _. ..-........._..... --
i
i
$300,000,000 ---- —.--._... ..
i
S
i
$250,000,000 .......__._....-.-_.._..... _......-...._........._._....._--
i
$200,000,000 - -------------.._..._
i
$150,000,000 ................. ..__--_._..
$100,000,000 ,
1
$50,000,000 —_..
3
30 Jun 03 30 Sep 03 30 Dec 03 31 Mar 04 30 Jun 04 30 Sep 04
i E3 Liquid Operating Monies 12 Long-Term Operating Monies'
Summary of Performance Data and Portfolio Statistics
Orange County Sanitation District
Liquid Operating Portfolio
5-Year Retvm vs.Standard Deviation
12
11 �------ x
10 r.-.
Performance 9 !
TatahPortfalia�'. : a 7 s
Before Fees(9:j 4.96 3AG 1.67 113 O 87 OAl 0-35 6 ititi 14 Vr
After FeOs(?k) 4.22 3:33 3 53 102 0 75;; ♦ >Ttsastay
4
CiUgrbup 3 Month T Biil'Index(96 3.91 2�6 1.41 104 0 80 O.St3 0 32 2 I
0 t 2 3 4 5 6 7 8 9 10 11 12
Standard Deviation of Return(1Y)
%of Market Value Duration in Yrs.
InformationSummary . 1 r • t r t it
Total MarketVelue•($MM) 112.4 72:8 ovemntetlt 27 '?i{ 0.0 0.0
QuarlertY don trititttfotss($IiAM) 20.5 : :-40.0 Mortgages; 0 !] 0.0 0:0
Estimated Annual Income($MM) 1.3 A: GOryofales 1 -10 0.0 0.0
Estimated Yield to Maturily.(96). 1.4 1.:8 High Yield. 0 0 0.0 oitr
Esbfrtated Duretion(yrs) 01 03 Nott U.5 S:DOrreftl fsa�ttes D 0.0 OA
:.
AVerageilAaturft�r.(vm 0.1 D: : 'Err Mttt ISsues 0 0 0.0 OG
Avergge eZualily.. AAA ` AAA: rZdter 0 0 0.0 0.0
Averae e'Coupon-(9o) 1.2` t:8 tdE+ttasMlAbneyt~Aarketsa 72 8ti 0.1 0.1
Net Currancy Expostene:(%) 0.0 9:0. i pt3r f TlF 5E 5B 0.1 p .
Tcac9gttg,Efr6t( yrs.,%)° 0.2 Al : TGdi�etttrrtenE 0 A 0.0., 0.0
Infemlatitirl ilatio(3 yis.)4 2.0 1.7 Cote of!?eposEt 2 6 0.0 ;': .0.0
•See example of tracking error 1 lniermatlon ratio on $ 1i1 � 0 Q 0.0 0:0
footnote page of the Appendix. :: aY FuWrBS 0 0 0.0 O:b
.964.Ciat>;littes 14 :`0 99.9 99.9
totat 10() 100 0.1 0.2
See footnotes in Appendix.
2
Summary of Performance Data and Portfolio Statistics
Orange County Sanitation District
Long Term Portfolio
b-Year Return vs.Standard Deviation
g
X lBAG
- • • 1 1 � ®
6 t�ctrtfopv IM' b�dex
7.
Iota{Portrollo1 5
Before:Fees(%): 8.19 8 08— AA5 2.22 1.98 0 4R. '94
After Fees(%) s .114 5.93 4.29 2.07 1.87 0.37 1 52 3
Cdtgtotsp 3-
2 Md
Merril 1-5 Yeas Gov%Corp:.C16 : 8.12 fi 18 4 37 1.75 1.61. -0.05. 1: 1 {
0 1 2 3 4 s s 7 a 9
Standard Deviation of Retum2(%)
%of Market Value %of Duration
i Summary Information
® 1 1 1 1 1
Total Market.Valus{$MM) 388.4 :`; 363.1 Govetnitient 79 '; 72 68: 68
Quarterty,Qohtributlons($MM} 0.0 41;0 Mortgages 18 16 26':• 23
-,.
Esftated:Annual lncorho($MM}.. 15 2 'f2.5 Corporates. 4 3 4 5.
Estimated Yield to::Maturity(°.6) 3.6 3;t. Wigh Yield 0 0 0 0
Estimated Duration(yrs) 2.3.. � 2.0 Non U,S.:$Developed issues 0 0 0 - "o
Benchmark Duration(yrs) 2 5: 2.5 Emerging>Markats Issues• 0 "0 0 0
Average.Matuctty.(yrs} 26 23, tf}tef 0 8 0 '0
Average Quaftty. : .. AAA :AAA Net Cash Egvivaten}s�• 1 9 2 : "3
Averagt3 Coupon(%} 4.0 .3.5 Comtat PapecLS"RF 3 6 0 `0
Net Currenc y upitmvre 0.0 0.0 ages 1 4 0 ;v
Traoklgg Error.(3 yrs.,%js 0.7 > 0.5 : .:Zr Corporates : 2 3 0 :.
Information Ratio(3.yrs.}3 -0.3 0.1 ST Goverrttnen 5 10 2..; 3
See example of tracking error 1 Information ratio on 4ffter :' 1 1 0 0
footnote page of time Appendbc less:liabgitles 13 •.12 0 0
'folaf 100 100 100. Ito
See footnotes in Appendix.
2
a
d
Orange County Sanitation District
Investment Transactions and Balances in the
State of California Local Agency Investment Fund
September 30, 2004
Par Value Book Value Market Value Rate Yield
Balance
September 1, 2004 $20,710,595 $20,710,595 $20,710,595 1.771 1.771
Deposits:
9/15/2004 25,500,000 25,500,000 25,500,000 1.771 1.771
9/21/2004 2,100,000 2,100,000 2,100,000 1.771 1.771
Total Deposits 27,600,000 27,600,000 27,600,000 1.771 1.771
Withdrawals:
9/1/2004 (5,000,000) (5,000,000) (5,000,000) 1.771 1.771
9/9/2004 (4,200,000) (4,200;000) (4,200,000) 1.771 1.771
9/23/2004 (1,000,000) (1,000,000) (1,000,000) 1.771 1.771
9124/2004 (8,500,000) (8,500,000) (8,500,000) 1.771 1.771
9/29/2004 (2,900,000) (2,900.000) (2,900,000) 1.771 1.771
Total Withdrawels (21,600,000) (21,600,000) (21,600,000) 1.771 1.771
Balance
September 30, 2004 $26,710,595 $26,710,595 $26,710,596 1.771 1.771
Report ID;GL8251
Asset Summary Base Currency:USD
by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LIQUID OPER-PJKC0-OCSF07511102 9 f 3012004 Status:FINAL
Net Unrealized
Description Cost Market Value % of Gain/Loss
P Shares Par Base Base Total Base
CASH&CASH EQUIVALENTS
U.S. DOLLAR
INTEREST 217,442.04 217,442.04 0.30% 0.00
CERTIFICATES OF DEPOSIT-DOMESTIC 5,500,000.000 5,500,000.00 5,500,000.00 7.56% 0.00
FED HM LOAN BNK-LESS THAN 1YR 13,400,000.000 13,353,723.00 13,353,723.00 18.36% 0.00
FEDERAL HOME LOAN MORTGAGE.-LESS THAN 1 14,400,000.000 14,338,956.39 14,338,956.39 19.71% 0.00
FNMA ISSUES-LESS THAN IYR 14,600,000.000 14,538,655.50 14,538,655.50 19.990/0 0.00
MUTUAL FUNDS 94,358.050 94,358.05 9,1,358.05 0.13% 0.00
TREASURY BILLS-LESS THAN IYR 17,600,000.000 17,534,153.29 17,534,153.29 24.11410 0.00
U.S.DOLLAR 65,594,358.050 65,577,288.27 65,577,288.27 90.15% 0.00
CASH&CASH EQUIVALENTS 65,594,358.050 65,577,288.27 65,577,288.27 90.15% 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
BANKING&FINANCE 5,500,000.000 5,614,810.00 5,584,900.00 7.68% -29,910.00
INDUSTRIAL 1,575,000.000 1,589,663.25 1,577,205.00 2.17% -12,458.25
U.S.DOLLAR 7,075,000.000 7,204,473.25 7,162,105.00 9.85% -42,368.25
FIXED INCOME SECURITIES 7,075,000.000 7,204,473.25 7,162,105.00 9.85°% -42,368.25
TOTAL ASSETS-BASE: 72,669,358.050 72,781,761.52 72,739,393.27 100.00% -42,368.25
c
d\ a
Asset Summary Report ID:GL82SI
Base Currency:USD
by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LONG TERa2 OPER-MBICO-OCSF07522202 9/30/2004 Status:FINAL
Net Unrealized
Cost Market Value % of Gain/Loss
Description Shares Par Base Base Total Base
CASH 86 CASH EQUIVALENTS
U.S. DOLLAR
PENDING TRADES -42,254,518.95 -42,254,518.95 -11.64% 0.00
INTEREST 2,322,987.65 2,322,987.65 0.64% 0.00
COMMERCIAL PAYER-DISCOUNT 700,000.000 696,370.47 696,370.47 0.19,16 0.00
FED HM LOAN BNK-LESS THAN 1YR 4,300,000.000 4,281,279.28 4,281,279.28 1.180/0 0.00
FEDERAL HOME LOAN MORTGAGE-LESS TITAN 1 400,000.000 397,784.56 397,784.56 0.11% 0.00
FNMA ISSUES- LESS THAN IYR 16,200,000.000 16,134,122.02 16,134,122.02 4.44% 0.00
MUTUAL FUNDS 1,138,604.420 1,138,604-42 1,138,604.42 0.31% 0.00
TREASURY BILLS-I,N SS THAN 1 YR 16,000,000.000 15,843,937.78 15,843,937.78 4.36% 0.00
U.S.DOLLAR 38,738,604.420 -1,439,432.77 -1,439,432.77 -0.4WA 0.00
CASH&CASH EQUIVALENTS 38,738,604.420 -1,439,432.77 -1,439,432.77 -0.40% 0,00
FIXED INCOME SECURITIES
U.S.DOLLAR
ABS-AIRPLANE RECEIVABLES 1,600,000.000 1,600,000.00 139,392.00 0.041% -1,460,608.00
ARS-HOME EQUITY 779,923.690 779,923.69 778,705.45 0.21% -1,218.24
BANKING&FINANCE 11.000.000.000 11,008,798.00 11,244,680.00 3.100% 235.882.00
COLLATERALIZED MORTGAGE OBLIGATION 1,920,261,520 1,920,261.52 2,081,947.54 0.570141 161,686.02
FHLMC MULTICLASS 873,31 L340 874,241.70 875,896.34 0.24% 1,654.64
FHLMC POOLS 63,273.510 61,731.20 64,871.04 0.020b 3,139.84
FNMA POOLS 53,460,150.680 54,387,072.00 54,376,328.71 14.97% -10,743.29
FNMA REMIC 719,440.970 733,829.79 721,674.11 0.20'0 -12,155.68
GNMA MULTI FAMILY POOLS 4,163,708.170 4,140,720.58 4,194,366.03 1.15%6 53,645.45
GNMA SINGLE FAMILY POOLS 598,735,870 627,749.36 634,804.51 0.17% 7,055.15
INDUSTRIAL 3,000,000.000 2,999,910.00 2,999,520.00 0.830l, -390.00
INFLATION INDEXED SECURITIES 35,318,880.000 35,335,799.79 38,706,006.82 10.66% 3,370,207.03
INSURANCE 1,600,000.000 1,594,032.00 1,649,248.00 0.450/a 55,2I6.00
PVT PLACEMENTS-MORE THN IYR 752,000.000 826,199.84 826,199.84 0.239f6 0.00
U.S.AGENCIES 33,930,387.380 34,898,038.45 35,050,733.53 9.65% 152,695.08
U.S.GOVERNMENTS 203,685,923.500 206,319,287.64 205,427,602.92 56.57% -891,684.72
UTILITY-ELECTRIC 4,750,000.000 4.694.370.00 4,828,042.50 1.339'o 133,672.50
------- -- ......._......... .. . . . -
1 Workbertch
Report ID:GL8251
Asset Summary Base Currency:USD
by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LONG TERM OPER-PWCO-OCSF07522202 9/30/2004 status:FINAL
Net Unrealized
Description Cost Market Value % of Gain/Loss
P Shares Par Base Base Total Base
U.S. DOLLAR 358,215,996.630 362,801,965.66 364,600,019.34 100.40% 1,798,053.78
FIXED INCOME SECURITIES 358,215,996.630 362,801,965.56 364,600,019.34 100.40% 1,798,053.78
TOTAL ASSETS-BASE: 396,954,601.050 361,362,532.79 363,160,586.57 100.00% 1,798,053.78
2 ','lorkbench
c a
� a
YLDANAL YIELD ANALYSIS PAGE 1
OCSF07511102 2004/09/30 RUN DATE : 10/04/04
DISTRICT: LIQUID OPERATING RUN TIME : 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ $ TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
CASH & CASH EQUIVALENTS
2,200,000.00 BANK OF AMERICA NA INSTL C/D .000 1.620 100.000 2,200,000.00 3.36
06050GEMS 1.620% 11/02/2004 DD 08/06/04 2,200,000.00 3.03
9,400,000.00 FEDERAL HOME LN BKS CONS DISC .000 .000 P-1 99.716 8,376,191.33 12.81
313384Q28 MAT 11/19/2004 A-1F 8,376,181.33 11.55
5,000,000.00 FEDERAL B014F. LN BK CONS DISC N .000 .000 P-1 99.551 4,977,541.67 7.61
313384559 MAT 12/08/2004 A-1+ 4,977,541.67 6.86
7,300,000.00 FEDERAL HOME LN MTG CORD DISC .000 .000 P-1 99.601 7,270,844.61 11.12
313396N82 MAT 11/09/2004 A-1+ 7,270,844.61 10.03
1,000,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.586 995,860.00 1.52
313396P72 MAT 11/16/2004 A-1+ 995,860.00 1.37
6,100,000.00 FEDERAL HOME LN MTG CORD DISC .000 .000 P-1 99.545 6,072,251.78 9.29
313396T37 MAT 12/14/2004 A-1+ 6,072,251.78 8.37
1,800,000.00 FEDERAL NATL MTG ASSN DISC NT .000 .000 P-1 99.597 1,792,755.00 2.74
31358BN27 MAT 11/3/2004 A-1+ 1,792,755.00 2.47
2,800,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.592 2,788,569.39 4.26
313588P82 MAT 11/17/2004 A-1+ 2,788,569.39 3.85
4,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.578 3,983,114.44 6.09
31358SQ73 MAT 11/24/2004 A-1+ 3,983,114.44 5.49
6,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.570 5,974,216.67 9.14
313588R64 MAT 12/01/2004 A-1+ 5,974,216.67 8.24
5,600,000.00 U S TREASURY BILL .000 .000 P-1 99.630 5,579,262.11 8.53
912795RK9 DUE 11/04/2004 DD 05/06/2004 A-1+ 5,579,262.11 7.69
2,000,000.00 U S TREASURY BILL .000 .000 P-1 99.600 1,991,997.50 3.04
912795RL7 DUE 11/12/2004 DD 05/13/2004 A-1+ 1,991,997.50 2.75
5,000,000.00 U S TREASURY BILL .000 .000 P-1 99.644 4,982,207.29 7.62
912795RM5 DUE 11/18/2004 DD 05/20/2004 A-1+ 4,982,207.29 6.87
5,000,000.00 U S TREASURY BILL .000 .000 P-1 99.614 4,980,686.39 7.62
912795RN3 DUE 11/26/2004 DD 05/27/2004 A-1+ 4,900,686.39 6.87
YLDANAL YIELD ANALYSIS PAGE 2
OCSF07511102 2004/09/30 RUN DATE : 10/04/04
DISTRICT: LIQUID OPERATING RUN TIME : 09.21.54
-----""""'------ ---- ------------....-.------..--------._.--...-..-----�--o=acaa-�wao===-==avow_.---as.
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
1,100,000.00 WELLS FARGO BANK NA INSTL C/D .000 1.650 100.000 1,100,000.00 1.68
9497P1BU2 1.650$ 10/07/2004 DD 09/09/04 1,100,000.00 1.52
2,200,000.00 WELLS FARGO BANK NA INSTL C/D .000 1.600 100.000 2,200,000.00 3.36
9497PICLI 1.600% 10/04/2004 DD 08/30/04 2,200,000.00 3.03
94,358.05 DREYFUS TREASURY CASH MGMT .000 1.459 AAA 100.000 94,358.05 .•14
996085247 AAA 94,358.05 .13
-------- ------- ----------------- ---------
TOTAL CASH 6 CASH EQUIVALENTS .000 .110 65,359,846.23 100.00
65,359,846.23 90.12
FIXED INCOME SECURITIES
3,000,000.00 ASSOCIATES CORP NORTH AMER SR .000 6.447 AA1 102.765 3,112,350.00 43.04
046003FF1 6,625% 06/15/2005 DD 06/09/95 AA- 3,082,950.00 4.25
1,575,000.00 DU PONT El DE NEMOURS 6 CO NT .000 6.741 AA3 100.140 1,589,663.25 22.02
263534BHI 6.750% 10/15/2004 DD 10/20/99 AA- 1,577,205.00 2.17
2,500,000.00 GENERAL ELEC CAP NTH #TR 00526 .000 2.003 AAA 100.078 2,502,460.00 34.93
36962GXX7 VAR RT 03/15/2005 DD 03/20/02 AAA 2,501,950.00 3.45
-------- ------- ----------------- ----------
TOTAL FIXED INCOME SECURITIES .000 5.763 7,204,473.25 100.00
7,162,105.00 9.87
-------- ------- ----------------- ---------
TOTAL .000 .233 72,564,319.48 100.00
72,521,951.23 100.00
_ a
YLDANAL YIELD ANALYSIS PAGE 3
OCSF07522202 2004/09/30 RUN DATE : 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
CASH S CASH EQUIVALENTS
700,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.601 697,204.28 1.81
313384P37 A-1+ 697,204.28 .17
3,600,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.558 3,584,075.00 9.31
313384S59 MAT 12/08/2004 A-I� 3,584,075.00 .89
400,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.446 397,784.56 1.03
313396Q71 MAT 11/24/2004 A-1+ 397,784.56 .10
700,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.766 698,364.14 1.81
31358SP66 MAT 11/15/2004 A-1+ 698,364.14 .17
5,400,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.604 5,378,617.50 13.97
313588P82 MAT 11/17/2004 A-1+ 5,379,617.50 1.33
800,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.580 796,643.11 2.06
31358SQ73 MAT 11/24/2004 A-I+ 796,643.11 .20
1,100,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.665 1,096,315.00 2.84
313588R49 MAT 11/29/2004 A-1+ 1,096,315.00 .27
4,000,000.00 FEDERAL NAIL MTG ASSN DISCOUNT .000 .000 P-1 99.591 3,983,636.61 10.34
31358SR64 MAT 12/01/2004 A-1+ 3,983,636.61 .99
200,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.555 199,110.22 .51
313588S55 MAT 12/08/2004 A-1+ 199,110.22 .05
400,000.00 FEDERAL NATL MTG ASSN DISC NTS .000 .000 P-1 99.568 398,270.44 1.03
313588T47 MAT 12/15/2004 A-1+ 398,270.44 .10
3,600,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.532 3,583,165.00 9.30
31358BU37 MAT 12/22/2004 A-1+ 3,583,165.00 .89
500,000.00 GENERAL ELEC CAP DISC .000 .000 P-1 99.450 497,249.58 1.29
36959HLGO 11/16/2004 497,249.58 .12
200,000.00 GENERAL ELEC CAP DISC .000 .000 P-1 99.560 199,120.89 .51
36959HM20 12/02/2004 199,120.89 .05
16,000,000.00 U S TREASURY BILL .000 .000 P-1 99.025 15,843,937.78 41.16
912795SG7 DUE 03/31/2005 DD 09/30/2004 A-1+ 15,843,937.78 3.93
YLDANAL YIELD ANALYSIS PAGE 4
OCSF07522202 2004/09/30 RUN DATE 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
1,138,604.42 DREYFUS TREASURY CASH MGMT .000 1.459 AAA 100.000 1,138,604.42 2.95
996085247 AAA 1,138,604.42 .28
-------- ------- ----------------- ---------
TOTAL CASH 6 CASH EQUIVALENTS .000 .007 38,492,098.53 100.00
38,492,098.53 9.54
FIXED INCOME SECURITIES
752,000.00 AIG SUNAMERICA GLOBAL REG S .000 5.325 109.867 826,199.84 .22
U00907AAO 5.850% 08/01/2008 DD 08/08/01 826,199.84 .20
2.2,000,000.00 COMMIT TO PUR FNMA SF MTG .000 4.923 AAA 101.563 22,381,562.50 6.12
O1F0504AI 5.000% 10/01/2019 DD 10/01/04 AAA 22,143,750.00 5.54
4,000,000.00 COMMIT TO PUR FNMA SF MTG .000 5.430 AAA 101.297 4,055,859.37 1.11
O1F0526A5 5.500% 10/01/2034 DD 10/01/04 AAA 4,051,875.20 1.01
3,500,000.00 FEDERAL HOME LN BK CONS BDS .000 6.992 AAA 101.895 3,732,225.00 .97
3133MAUN7 7.125% 02/15/2005 DD 02/08/00 AAA 3,566,338.65 .88
63,273.51 FHLMC GROUP 078-6064 .000 3.304 AAA 102.525 61,731.20 .01
31348SWZ3 6.384% 01/01/2028 DD 12/01/97 AAA 64,871.04 .02
11,350,000.00 FEDERAL NATL MTG ASSN DEBS .000 5.037 AAA 104.219 11,521,271.50 3.24
31359MJX2 5.250% 06/15/2006 DD 06/22/01 AAA 11,828,822.45 2.93
694,374.27 FNMA POOL 40254510 .000 4.905 AAA 101.941 715,205.49 .19
31371KV54 5.000% 11/01/2017 DD 10/01/02 AAA 707,854.92 .18
149,427.46 FNMA POOL #0254631 .000 4.905 AAA 101.941 153,910.29 .04
31371KY47 5.000% 02/01/2018 DD O1/01/03 AAA 152,328.46 .04
132,882.67 FNMA POOL 00254760 .000 4.906 AAA 101.910 136,869.14 .03
31371K5V9 5.000% 06/01/2018 DD 05/01/03 AAA 135,420.94 .03
60,193.59 FNMA POOL 40254866 .000 4.906 AAA 101.910 61,999.40 .01
31371LCB3 5.000% 09/01/2018 DD 08/01/03 AAA 61,343.38 .02
318,282.21 FNMA POOL 00254953 .000 4.909 AAA 101.848 322,360.21 .08
31371LE21 5.000% 11/01/2018 DD 10/01/03 AAA 324,162.98 .08
c a�
a
YLDANAL YIELD ANALYSIS PAGE 5
OCSF07522202 2004/09/30 RUN DATE. 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
864,896.51 FNMA POOL 40254987 .000 4.915 AAA 101.731 875,977.99 .24
3137ILF46 5.000% 12/01/2018 DD 11/01/03 AAA 879,867.83 .22
156,322.37 FNMA POOL 40323980 .000 5.706 AAA 105.145 163,210.32 .04
31374T2M0 6.000% 04/01/2014 DD 09/01/99 AAA 164,364.42 .04
25,354.45 FNMA POOL 40357328 .000 4.912 AAA 101.790 26,115.08 .00
31376J4M8 5.000% 01/01/2018 DD 01/01/03 AAA 25,808.25 .01
1,333,703.06 FNMA POOL #0357430 .000 4.906 AAA 101.910 1,348,707.22 .37
31376KA71 5.000% 09/01/2018 DD 09/01/03 AAA 1,359,178.92 .34
45,096.97 FNMA POOL 40456482 .000 5.706 AAA 105.145 47,084.04 .01
31381CCT2 6.000% 02/01/2014 DD 02/01/99 AAA 47,417.00 .01
125,792.21 FNMA POOL *0509649 .000 5.706 AAA 105.145 131,334.93 .03
31383QEWO 6.000% 09/01/2014 DD 09/01/99 AAA 132,263.63 .03
122,183.34 FNMA POOL #0535451 .000 5.713 AAA 105.020 127,567.04 .03
31384VZQ8 6.000% 06/01/2015 DD 07/01/00 AAA 128,316.37 .03
318,503.77 FNMA POOL 00555363 .000 4.905 AAA 101.941 328,058.87 .08
31385W5Y1 5.0008 04/01/2018 DD 03/01/03 AAA 324,687.23 .08
33,019.78 FNMA POOL 40555453 .000 4.905 AAA 101.941 33,442.85 .00
31385XBW6 5.000% 05/01/2018 DD 04/01/03 AAA 33,660.83 .01
263,865.95 FNMA POOL #0555545 .000 4.905 AAA 101.941 271,781.94 .07
31385XES2 5.000% 06/01/2018 DD 05/01/03 AAA 268,988.67 .07
914,587.42 FNMA POOL #0555621 .000 4.915 AAA 101.731 924,B76.53 .25
31385XG68 5.000% 07/01/2018 DD 06/01/03 AAA 930,418.89 .23
492,259.84 FNMA POOL #0681309 .000 4.905 AAA 101.941 507,027.63 .13
31391Y3S4 5.000% 02/01/2018 DD 02/01/03 AAA 501,816.62 .12
59,940.63 FNMA POOL #0681334 .000 4.905 AAA 101.941 61,738.85 .01
31391Y4T1 5.000% 02/01/2018 DD 01/01/03 AAA 61,104.32 .02
719,440.97 FNMA GTD REMIC P/T 02-76 PD .000 4.985 AAA 100.310 733,829.79 .19
31392FKF3 5.000% 08/25/2022 DD 10/01/02 AAA 721,674.11 .18
314,850.30 FNMA POOL #0684908 .000 4.905 AAA 101.941 318,884.33 .08
31400D3R1 5.000% 06/01/2018 DD 05/01/03 AAA 320,962.84 .08
YLDANAL YIELD ANALYSIS PAGE 6
OCSF07522202 2004/09/30 RUN DATE : 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME t 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE $ TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
176,817.75 FNMA POOL 00685200 .000 4.905 AAA 101.941 179,083.24 .04
31400EGH7 5.000% 03/01/2018 DD 03/01/03 AAA 180,250.51 .04
30,581.20 FNMA POOL #0685665 .000 4.905 AAA 101,941 31,498.64 .00
31400EII22 5.000% 02/01/2018 DD 02/01/03 AAA 31,174.91 .01
262,419.21 FNMA POOL 40686318 .000 4.905 AAA 101.941 270,291.79 .07
31400FPB7 5.000% 03/01/2018 DD 03/01/03 AAA 267,513.94 .07
104,370.76 FNHA POOL #0688739 .000 4.906 AAA 101,910 107,501.88 .02
31400JEL9 5.000% 06/01/2018 DD 06/01/03 AAA 106,364.41 .03
84,537.99 FNMA POOL #0689859 .000 4.906 AAA 101.910 85,621.14 .02
3140OKMGS 5.000% 05/01/2018 DD 05/01/03 AAA 86,152.80 .02
594,812.63 F14MA POOL #0693834 .000 4.905 AAA 101.941 612,657.00 .16
3140OPY74 5.000% 03/01/2018 DD 03/01/03 AAA 606,360.38 .15
212,146.76 FNMA POOL #0695852 .000 4.906 AAA 101.910 218,511.16 .05
31400SBVO 5.000% 05/01/2016 DD 05/01/03 AAA 216,199.10 .05
703,743.63 FNMA POOL #0695889 .000 4.906 AAA 101.910 724,855.95 .19
31400SC23 5.000% 05/01/2018 DD 05/01/03 AAA 717,186.26 .18
22,092.44 FNMA POOL 00697026 .000 4.905 AAA 101.941 22,755.23 .00
3140OTLF2 5.000% 05/01/2018 DD 04/01/03 AAA 22,521.34 .01
210,296.98 FNMA POOL 40702210 .000 4.915 AAA 101.731 216,605.88 .05
31401ADP9 5.000% 05/01/2018 DD 05/01/03 AAA 213,937.21 .05
129,939.53 FNMA POOL #0702328 .000 4.905 AAA 101.941 131,604.38 .03
31401AHD2 5.000% 05/01/2018 DD 04/01/03 AAA 132,462.19 .03
264,680.93 FNMA POOL #0709148 .000 4.906 AAA 101.910 272,621.36 .07
31401HZM7 5.000% 06/01/2018 DD 06/01/03 AAA 269,736.76 .07
620,273.85 FNMA POOL 00709360 .000 4.906 AAA 101.910 628,221.12 .17
31401JB56 5.000% 07/01/2018 DD 06/01/03 AAA 632,122.07 .16
103,722.22 FNMA POOL 00709826 .000 4,906 AAA 101.910 105,051.16 .02
31401JSP4 5.000% 06/01/2018 DD 06/01/03 AAA 105,703.48 .03
219,226.92 FNMA POOL #0709917 .000 4.906 AAA 101.910 222,035.76 .06
31401JVJ4 5.000% 06/01/2018 DD 06/01/03 AAA 223,414.50 .06
c o
J A
YLDANAL YIELD ANALYSIS PAGE 7
OCSF07522202 2004/09/30 RUN DATE : 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE B TOTAL
----------------- ----------------------------- ------- ------- ----- -------- ------------ ----------
18,201.79 FNMA POOL #0709963 .000 4.915 AAA 101.731 18,435.01 .00
31401JWY0 5.000% 06/01/2018 DD 06/01/03 AAA 18,516.86 .00
582,815.86 FNMA POOL 00710235 .000 4.906 AAA 101.910 600,300.35 .16
31401KBCB 5.000% 06/01/2018 DD 06/01/03 AAA 593,948.58 .15
15,893.50 FNMA POOL 40713344 .000 4.906 AAA 101.910 16,370.30 .00
31401NP52 5.000% 06/01/2018 DD 06/01/03 AAA 16,197.09 .00
256,335.02 FNMA POOL 40713365 .000 4.906 AAA 101.910 259,619.31 .07
31401NQS1 5.000% 07/01/201B DD 07/01/03 AAA 261,231.43 .06
709,543.42 FNMA POOL 00720319 .000 4.906 AAA 101.910 718,634.44 .19
31401WG45 5.000% 07/01/2018 DD 07/01/03 AAA 723,096.83 .18
2,058,931.59 FNMA POOL 40720369 .000 4.915 AAA 101.731 2,120,699,54 .57
31401WJII0 5.000% 06/01/2018 DD 06/01/03 AAA 2,094,571.61 .52
286,237.62 FNMA POOL 00721629 .000 4.906 AAA 101.910 294,024.77 .08
31401XVW4 5.000% 07/01/2018 DD O6/01/03 AAA 291,705.22 .07
233,241.84 FNMA POOL #0723487 .000 4.906 AAA 101.910 235,865.81 .06
31402AX04 5.000% 06/01/2018 DD 06/01/03 AAA 237,697.13 .06
391,186.70 FNMA POOL $0729601 .000 4.906 AAA 101.910 396,198.78 .10
31402HRW3 5.000% 07/01/2018 DD 07/01/03 AAA 198,658.99 .10
33,344.72 FNMA POOL 40732873 .000 4.907 AAA 101.891 33,771.93 .00
31402MFN5 5.000% 11/01/2010 DD 10/01/03 AAA 33,975.41 .01
648,278.50 FNMA POOL 40737130 .000 4.906 AAA 101.910 656,584.57 .18
31402S4P9 5.000% 10/01/2018 DD 10/01/03 AAA 660,661.66 .16
517,728.23 FNMA POOL 00738211 .000 4.915 AAA 101.731 524,361.64 .14
31402UDQ2 5.000% 10/01/2018 DD 10/01/03 AAA 526,690.08 .13
186,832.71 FNMA POOL 40738487 .000 4.909 AAA 101.849 189,226.50 .05
31402UNC2 5.000% 10/01/2018 DD 10/01/03 AAA 190,284.74 .05
673,747.59 FNMA POOL 00740471 .000 4.915 AAA 101.731 682,379.96 .19
31402WT40 5.000% 10/01/2018 DD 10/01/03 AAA 685,410.13 .17
745,479.74 FNMA POOL #0740748 .000 4.906 AAA 101.910 755,031.19 .20
31402W5H7 5.000% 10/01/7018 DD 11/01/03 AAA 759,719.60 .19
YLDANAL YIELD ANALYSIS PAGE 8
OCSF07522202 2004/09/30 RUN DATE : 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ----- -------- ------------ ----------
37,509.13 FNMA POOL #0743868 .000 4.915 AAA 101.731 37,989.69 .01
31403BMR1 5.000% 11/01/2018 DD 10/01/03 AAA 38,158.39 .01
976,392.39 FNMA POOL #0744009 .000 4.906 AAA 101,910 988,902.41 .27
31403BR54 5.000% 07/01/2018 DD 09/01/03 AAA 995,043.05 .25
153,543.48 FNMA POOL 00744316 .000 4.915 AAA 101.731 155,510.76 .04
31403B3Z4 5.000% 09/01/2018 DD 09/01/03 AAA 156,201.31 .04
340,171.47 FNMA POOL #0747914 .000 4.909 AAA 101.848 344,529.92 .09
31403F3X0 5.000% 11/01/2018 DD 11/01/03 AAA 346,456.68 .09
203,586.21 FNMA POOL 00748400 .000 4.915 AAA 101.731 206,194.66 .05
31403GNR9 5.000% 08/01/2018 DD 09/01/03 AAA 207,110.28 .05
918,874.30 FNMA POOL 00748899 .000 4.911 AAA 101.810 930,647.37 .25
31403G7L0 5.000% 12/01/2018 DD 11/01/03 AAA 935,505.06 .23
2,114,955.59 FNMA POOL 00750377 .000 4.911 AAA 101.810 2,142,053.46 .59
31403JUA2 5.000% 11/01/2018 DD 11/01/03 AAA 2,153,234.30 .53
1,884,100.47 FNMA POOL #0750380 .000 4.911 AAA 101.810 2,908,240.53 .52
31403JUD6 5.000% 11/01/2018 DD 11/01/03 AAA 1,918,200.92 .48
168,149.99 FNMA POOL 40750445 .000 4.911 AAA 101.810 170,304.42 .04
31403JWE2 5.000% 11/01/2018 DD 11/01/03 AAA 171,193.35 .04
795,318.64 FNMA POOL 00751960 .000 4.915 AAA 101.731 805,508.67 .22
31403LMHI 5.000% 12/01/2018 DD 11/01/03 AAA 809,085.57 .20
839,403.29 FNMA POOL #0753425 .000 4.914 AAA 101.754 849,108.88 .23
31403NA23 5.000% 11/01/2018 DD 11/01/03 AAA 854,125.67 .21
589,478.11 FNMA POOL 40755165 .000 4.909 AAA 101.848 597,030.80 .16
31403Q6A3 5.000% 12/01/2018 DD 11/01/03 AAA 600,369.66 .15
915,669.20 FNMA POOL #0756372 .000 4.909 AAA 101.848 926,256.62 .25
31403SJR8 5.000% 11/01/2018 DD 11/01/03 AAA 932,587.65 .23
10,880.44 GNMA POOL #0421389 .000 6.124 AAA 106.133 11,419.37 .00
36206UC23 6.500% 04/15/2026 DD 04/01/96 AAA 11,547.72 .00
19,939.53 GNMA POOL 00449851 .000 6.157 AAA 105.566 20,927.17 .00
36208FWLO 6.500% 01/15/2028 DD 01/01/98 AAA 21,049.37 .01
YLDA14AL YIELD ANALYSIS PAGE 9
OCSF07522202 2004/09/30 RUN DATE 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE ttARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- -------- -------- ------------ ----------
36,672.86 GHMA POOL 00466845 .000 6.130 AAA 106.039 38,489.31 .01
36209BTA6 6.500% 06/15/2028 DD 06/01/98 AAA 38,887.56 .01
111,518.20 GNMA POOL 40468052 .000 6.130 AAA 106.039 117,041.83 .03
36209C5M4 6.500% 07/15/2028 DD 07/01/98 AAA 118,252.85 .03
154,360.22 GNMA POOL #0476041 .000 6.130 AAA 106.039 161,764.70 .04
36209MZE7 6.500% 06/15/2028 DD 06/01/98 AAA 163,682.13 .04
121,178.19 GN?lA POOL #0478626 .000 6.130 AAA 106.039 126,990.96 .03
362090VT9 6.500% 01/15/2029 DD 01/01/99 AAA 128,496.21 .03
28,890.97 GNMA POOL #0480598 .000 6.130 AAA 106.039 30,276.82 .00
36209S3F6 6.500% 10/15/2028 DD 10/01/98 AAA 30,635.71 .01
8,429.36 GN14A POOL 00512235 .000 6.133 AAA 105.977 8,846.87 .00
36211GBC6 6.5006 11/15/2029 DD 11/01/99 AAA 8,933.15 .00
106,966.10 GNMA POOL 40514326 .000 6.130 AAA 106.039 111,992.33 .03
36211JLF2 6.500% 07/15/2029 DD 07/01/99 AAA 113,319.81 .03
197,873.22 GNMA II POOL 00080395 .000 3.342 AAA 100.996 196,080.00 .05
36225CNM4 VAR RT 04/20/2030 DD 04/01/00 AAA 199,843.48 .05
1,781,830.04 GNMA II POOL 008040OX .000 3.342 AAA 100.995 1,763,733.32 .49
36225CN28 6.500$ 05/20/2030 DD 05/DI/00 AAA 1,799,561.57 .45
379,619.49 GNMA II POOL #0080900 .000 3.020 AAA 99.352 369,357.89 .10
36225DAA2 VAR RT 05/20/2034 DD 05/01/04 AAA 377,160.50 .09
1,394,813.52 G17MA II POOL 00080965 .000 3.481 AAA 100.542 1,393,941.75 .38
36225DCBB VAR RT 07/20/2034 DD 07/01/04 AAA 1,402,373.69 .35
3,000,000.00 GENERAL MTRS ACCEP CORP SR NT .000 5.813 A3 105.359 3,064,350.00 .86
370425SD3 6.125% 08/28/2007 DD 08/29/02 BBB 3,160,770.00 .78
800,000.00 GOLDMAN SACHS GRP MTN 4TR00207 .000 1.977 AA3 100.140 000,000.00 .21
38141EJ03 VAR RT 07/23/2009 DD 07/23/04 A+ 801,120.00 .20
3,000,000.00 GOLDMAN SACHS GROUP INC SR NT .000 4.047 AA3 101.921 3,030,030.00 .83
38141GCSI 4.125% 01/15/2008 DD 01/13/03 A+ 3,057,630.00 .76
3,000,000.00 KRAFT FOODS INC NT .000 1.960 A3 99.984 2,999,910.00 .82
50075NAJ3 VAR RT 11/26/2004 DD 11/26/02 BBB+ 2,999,520.00 .74
YLDANAL YIELD ANALYSIS PAGE 10
OCSF07522202 2004/09/30 RUN DATE : 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
3,200,000.00 MORGAN STANLEY NT DOO 3.874 AA3 100.015 3,149,248.00 .87
61746BALO 3.875% 01/15/2009 DD 01/13/04 A+ 3,200,480.00 .79
779,923.69 RESIDENTIAL ASSET 03-RS11 AIIB .000 2.173 AAA 99.844 779,923.69 .21
760985K83 VAR RT 12/25/2033 DD 12/30/03 AAA 778,705.45 .19
2,985,923.5C SBA GTD DEV PARTN 2001-20C 1 .000 5.852 AAA 108.345 2,985,923.50 .08
83162CLJO 6.340% 03/01/2021 AAA 3,235,098.82 .80
1,920,261.52 SBA GTD PARTN CTFS SBIC-PS 01 .000 6.124 AAA 108.420 1,920,261.52 .57
831641DD4 6.640% 02/10/2011 DD 02/21/01 NR 2,081,947.54 .52
1,600,000.00 UNITED AIRLS PASSTHRU 01-1 C .000 78.409 WR 8.712 1,600,000.00 .03
909317BC2 6.831% 03/01/2010 DD 08/22/01 A- 139,392.00 .03
20,000,000.00 U S TREASURY NOTES .000 5.782 AAA 108.094 22,620,312.50 5.92
9128272JO 06.250% 02/15/2007 DD 02/15/97 AAA 21,618,800.00 5.36
3,522,270.00 US TREASURY INFLATION INDEX NT .000 3.305 AAA 109.688 3,831,771.35 1.05
9128273T7 3.625% 01/15/2008 DD 01/15/98 AAA 3,863,489.91 .96
15,035,670.00 US TREASURY INFLATION INDEX NT .000 3.442 AAA 112.594 16,661,030.11 4.64
9128274Y5 3.875% 01/15/2009 DD 01/15/99 AAA 16,929,262.28 4.20
3,900,000.00 U S TREASURY NOTES .000 5.535 AAA 103.890 4,28B,149.14 1.11
9128276N7 05.750% 11/15/2005 DD 11/15/00 AAA 4,051,729.50 1.01
17,600,000.00 U S TREASURY NOTES .000 3.353 AAA 100.660 17,405,000.00 4.85
912828BT6 3.375% 12/15/200B DD 12/15/03 AAA 17,716,160.00 4.40
61,000,000.00 U S TREASURY NOTES .000 1.986 AAA 99.440 60,967,721.21 16.63
912828BX7 1.875% 01/31/2006 DD 01/31/04 AAA 60,658,400.00 15.05
17,000,000.00 U S TREASURY NOTES .000 1.642 AAA 98.984 17,045,156.25 4.61
912828CB4 1.625% 02/28/2006 DD 02/29/04 AAA 16,027,344.60 4.17
33,000,000.00 U S TREASURY NOTES .000 2.256 AAA 99.740 32,835,000.00 9.02
912828CF5 2.250% 04/30/2006 DD 04/30/04 AAA 32,914,200.00 8.17
27,500,000.00 U S TREASURY NOTES .000 2.738 AAA 100.440 27,463,468.63 7.57
912828CMO 2.750% 06/30/2006 DD 06/30/04 AAA 27,621,000.00 6.85
20,700,000.00 U S TREASURY NOTES .000 2.739 AAA 100.410 20,708,556.41 5.70
912828CQI 2.750% 07/31/2006 DD 07/31/04 AAA 20,784,870.00 5.16
YLDANAL YIELD ANALYSIS PAGE 11
OCSF07522202 2004/09/30 RUN DATE : 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 09.21.54
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ------------------------- ------- ------- ------- -------- ------------ ----------
1,750,000.00 VIRGINIA ELEC 6 PWR 01 SER A .000 5.527 A3 104.031 1,743,840.00 .49
927804ENO 5.750% 03/31/2006 DD 03/27/01 BBB+ 1,820,542.50 .45
16,760,940.00 US TREASURY INFLATION INDEX NT 3.817 3.156 AAA 106.875 14,842,998.33 4.91
9128272M3 3,375% 01/15/2007 DD 01/15/97 AAA 17,913,254.63 4.44
15,500,000.00 FEDERAL NATL MTG ASSN DEBS 5.967 6.991 AAA 101.911 16,154,410.00 4.33
31359MFHI 7.125% 02/15/2005 DD 02/14/00 AAA 15,796,195.70 3.92
873,311.34 FHLMC MULTICLASS MTG SER E3 A 6.316 3.621 AAA 100.296 874,241.70 .24
3133TCE95 VAR RT 08/15/2032 DD 12/01/97 AAA 975,896.34 .22
541,639.63 GNMA GTD REMIC TR 2000-9 FH 6.320 2.263 AAA 100.706 541,639.63 .14
3837H4NX9 VAR RT 02/16/2030 AAA 545,463.61 .14
235,705.78 GNMA II POOL 40800BOM 6.705 3.340 AAA 101.038 240,861.85 .06
36225CC20 7.375% 06/20/2027 DD 06/01/97 AAA 238,153.42 .06
173,866.12 GNMA 11 POOI, 00080023 6.992 4.536 AAA 101.960 176,745.77 .04
36225CA29 VAR RT 12/20/2026 DD 12/01/96 AAA 177,273.37 .04
2,100,000.00 FEDERAL NATL MTG ASSN DEBS 7.113 5.873 AAA 112.802 2,030,133.00 .64
31359MEY5 6.625% 09/15/2009 DD 09/01/99 AAA 2,368,840.74 .59
1,000,000.00 FORD MOTOR CR CO NT 7.582 6.587 A3 102.468 965,170.00 .28
345397GV9 6.750$ 05/15/2005 DD 05/24/93 BBB- 1,024,680.00 .25
938,747.75 WMP/HUNTOON PAIGE #000-11150 7.684 7.450 AAA 100.674 918,359.32 .25
302998GE3 7.500% 12/01/2030 DD 10/21/99 AAA 945,072.38 .23
3,000,000.00 PACIFICORP SECD MTN OTR 00115 7.709 7.282 A3 100.250 2,950,530.00 .82
69512EEU5 7.300% 10/22/2004 DD 10/22/92 A 3,007,500.00 .75
YLDANAL YIELD ANALYSIS PAGE 12
OCSF07522202 2004/09/30 RUN DATE 10/04/04
DISTRICTS LONG-TERN OPERATING RUN TIME t 09.21.54
�e=nv==aaaaa==aa=a_==c==oaa=o=oeaass-- �.----
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ $ TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE $ TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
1,600,000.00 ALLSTATE CORP SR NT 7.967 7.640 Al 103.078 1,594,032.00 .45
020002AL5 7.8751 05/01/2005 DD 05/01/00 A+ 1,649,248.00 .41
-
TOTAL FIXED INCOME SECURITIES .172 4.365 362,801,965.56 100.00
364,600,019.34 90.46
-------- ------- ----------------- ---------
TOTAL .168 4.276 401,294,064.09 100.00
403,092,117.87 100.00
FA H R COMMITTEE Meeting Date To Bd. of Dir.
11/10/04 11/17/04
AGENDA REPORT Item Number Item Number
FAHR04-98 14(d)
Orange County Sanitation District
FROM: Gary Streed, Director of Finance
Originator: Michael D. White, Controller
SUBJECT: FINANCIAL REPORT FOR THE QUARTER ENDED
SEPTEMBER 30, 2004
GENERAL MANAGER'S RECOMMENDATION
Receive and file the FY 2004-05 Financial Report for the First Quarter ended
September 30, 2004.
SUMMARY
Attached in a separately bound document is the District's First Quarter Financial Report
for the period ended September 30, 2004. This report is a consolidation of the financial
accomplishments of the District through the through the first quarter of the FY 2004-05.
Contained within the First Quarter Financial Report are budget summary reviews of the
Joint Operating & Working Capital Funds, the Capital Improvement Program. the
Revenue Areas, and the self-insurance funds.
As indicated within the Overview Section of this report, 22.01 percent, or $18.41 million
of the FY 2004-05 net joint operating budget of $83.61 million has been expended. Net
cost has decreased S403,000 in comparison with the same period last year.
The total cost per million gallons at September 30, 2003 is $844.60 based on flows of
21 .79 billion gallons. or 236.88 million gallons per day. This is $71.72, or 7.83 percent
below the budgeted cost per million gallons of $916.32. This shortfall is primarily due to
expenditures being lower than budget by 11.95 percent, or $2.5 million. This
expenditure shortfall is somewhat offset by the fact that flows are 5.25 percent lower
than the budget estimate of 250 million gallons per day.
PROJECT/CONTRACT COST SUMMARY
N/A
H ldephagenda\FAHR1FAHR2004\1104\04-98 Financial Report doc
Revised 8120/98 Page 1
BUDGETIMPACT
❑ This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
None.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. FY 2004-05 Financial Report for the Quarter Ended September 30, 2004.
H ldepMgenda\FAHR1FAHR200411104\04-98 Financial Repert doc
Revised 8/20198 Page 2
FA H R CO M M ITT E E Meeting Date To Bd.of Dir.
11/10/04 11/17/04
AGENDA REPORT Item Number Item Number
FAHR04-99 14(e)
Orange County Sanitation District
FROM: Gary G. Streed, Director of Finance
Originator: Michael D. White, Controller
SUBJECT: SWAP REPORT FOR THE QUARTER ENDED SEPTEMBER 30. 2004
GENERAL MANAGER'S RECOMMENDATION
Receive and file Swap Report for the quarter ended September 30, 2004.
SUMMARY
In August 2003, the Committee approved an Interest Rate Exchange Agreement Policy that
provides guidelines for the use of hedging products including swaps, caps. floors, collars, options,
and other similar financial instruments (collectively, -hedging products") in connection with the
financial exposure of the District, including interest rate exposure. As required by this policy,
following are the quarterly monitoring and reporting requirements and status at
September 30,2004:
Requirement
Highlight all material changes to hedging product agreements including counterparty downgrades
and/or terminations.
Results:
The District currently utilizes two hedging product agreements. the AIG Swap agreement and the
Soc Gen Swap Agreement. The AIG Swap agreement was originally entered into in
October 1, 1992, in order to convert the Refunding Certificates of Participation, 1992 Series (the
"1992 Certificates") to a fixed rate obligation. There have been no material changes to the
agreement. American International Group, Inc.'s current ratings are AAA and Aaa from Standard
and Poor's and Moody's, respectively.
The Soc Gen Swap Agreement was originally entered into in September 1, 1993, in order to
convert the Refunding Certificates of Participation, 1993 Series (the "1993 Certificates) to a fixed
rate obligation. There have been no material changes to the agreement. Soc Gen's current
ratings are AA- and Aa3 from Standard and Poor's and Moody's. respectively.
Requirement
Summarize any new hedging products entered into by the District since the last report.
Results:
No new hedging products have been entered into by the District since the last report covering the
period ended September 30, 2003. As stated above. the District utilizes only two hedging product
agreements. the AIG Swap agreement entered into in 1992. and the Soc Gen Swap Agreement,
entered into in 1993.
Requirement
Summarize any planned hedging product transactions and the impact of such transactions on the
District; a description of each outstanding Hedging Product agreement, including a summary of its
terms and conditions, the notional amount. volume, rates. maturity. the estimated market value of
each agreement. the method of procurement (competitive or negotiated), and the full name.
description and credit ratings of the agreement's counterparty and if necessary, its applicable
guarantor.
Results:
The District currently is not planning any additional hedging product transactions at this time.
Requirement
List any amounts which were required to be paid and received, and any amounts which actually
were paid and received under each outstanding hedging product over the last quarter;
Results:
Following are the amounts that were actually paid and received under the District's two swap
agreements. All amounts required to be paid and received were actually paid and received.
1992 1993
Certificates Certificates
AIG Swap Soc Gen Swap
July
Paid by the District to the Swap Provider _ $161.500.00
Paid by the Swap Provider on behalf of the District _ $ (36.786.89)
August
Paid by the District to the Swap Provider $2,968,278.75 $159,790.00
Paid by the Swap Provider on behalf of the District $ (529,798.21) $ (39,821.12)
September
Paid by the District to the Swap Provider _ $159.790.00
Paid by the Swap Provider on behalf of the District _ $ (46.151.59)
Requirement
List any credit enhancement, liquidity facility or reserves associated therewith including an
accounting of all costs and expenses incurred, whether or not in conjunction with the procurement
of credit enhancement or liquidity facilities under each outstanding Hedging Product.
Results:
Credit Enhancements, liquidity facility or reserves associated with the 1992 Certificates AIG Swap:
-Lloyds Bank Letter of Credit cost for the quarter ended September 30, 2004: $727485.42
H\dept\aoenda\FAHR\FAHR200411104\04-99 SWAP doc
Revised 06/04103 Page 2
q
Q Credit Enhancements, liquidity facility or reserves associated with the 1993 Certificates Soc Gen
Swap:
-Soc Gen Irrevocable Letter of Credit Fee for the quarter ended September 30, 2004:
$53,833.41
Credit Enhancements, liquidity facility or reserves associated with the 2000 Certificates:
-Dexia Public Finance Bank Standby Certificate Purchase Agreement Commitment Fee for the
quarter ended September 30, 2004: $73,766.34
Requirement
An assessment of the counterparty risk, termination risk, and other risks associated therewith,
which shall include the value of the collateral posted by counterparties and the District, the
aggregate marked-to-market value for each counterparty and relative exposure compared to other
counterparties, and a calculation of the District's Value at Risk for each counterparty.
Results:
The counter party risk and termination risk has been calculated by Public Resources Advisory
Group (PRAG). PRAG used the value at risk methodology in determining the county party risk at
maximum exposure over the term of the Swap Agreements. Counterparty exposure limits are
important because they create diversification, so if any one counterparty goes bankrupt, the
District's total loss would be limited to only one counterparty. The termination risk is what the
District would have to pay the counterparty upon a termination of the Swap Agreement. Following
are the counterparty risk an termination risk as of September 30, 2004:
1992 1993
Certificates Certificates
AIG Swap Soc Gen Swap
Counterparty Risk $ 3,220,915 $4,321,854
Termination Risk $13,053,258 $3,005,376
Requirement
The report shall also include a copy of this Policy in the quarter after it is adopted or subsequently
modified.
Results:
No modifications have been made to the Policy since its adoption.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
N/A
H-.ldeptlagendaTAHR%FAHR2004%1 1 04104-99.SWAP.doc
Revised 06/04103 Page 3
BUDGETIMPACT j
e
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
J NIA
ATTACHMENTS
NIA
H.WepilagendalFAHR%FAHR200411104104-99 SWAP.doc
Revised 06/04/03 Page 4
FAH R COMMITTEE Meeting Date To Bd.of Dir.
11/10/04 11/17/04
AGENDA REPORT Item Number Item Number
FAHR04-100 14(f)
Orange County Sanitation District
FROM: Lisa L. Tomko, Director of Human Resources
Originator: Ann Sullivan, Principal Human Resources Analyst
SUBJECT: 1. 2004 NOVEMBER RECLASSIFICATIONS
2. DIRECTOR OF COMMUNICATIONS AND
ADMINISTRATIVE SERVICES PAY RANGE PLACEMENT
GENERAL MANAGER'S RECOMMENDATION
1. Approve the reclassification of two District employees and one position upgrade
2. Approve the pay range placement of the Director of Communications and
Administrative Services
SUMMARY
1. Approve the reclassification of two District employees and one position upgrade
According to Human Resources Policy and Procedure Number C10.10,
reclassification requests are considered twice a year, during the annual
budget process and again in November.
Reclassification paperwork was submitted on a total four positions: three
of these positions have incumbents and one position upgrade will be
posted for promotional opportunities.
Of the three positions having incumbents, two employees have met the
four criteria outlined in the following Reclassification Guidelines:
i. The incumbent has been in the position being reclassified for at
least 6 months
ii. Incumbent has been performing the duties of the reclassified
position for at least 6 months
iii. The incumbent is qualified for the reclassified position
iv. The incurnbent's reclassified position is not being reclassified from
a non-supervisory to a supervisory classification
The two reclassification requests with incumbents that have met all four
reclassification guideline criteria above will result in classification changes
for current employees effective upon Board approval.
The one position upgrade that has no current incumbent will be posted for
promotional opportunities adhering to Human Resources Policy B150.00.
Recruitment.
Reclassify Public Information Specialist position to Senior Public Information
Specialist. See Attachment 1.
Reclassify Associate Engineer III to Engineer. See Attachment 1.
Page 1
Upgrade Senior Engineer position in Division 640 — Source Control, to
Engineering Supervisor position. Upgraded position will be posted as a
promotional opportunity. See Attachment 1.
2. Approve the pay range placement of the Director of Communications &
Administrative Services
A customized market survey was conducted in October 2003 containing
only the Executive Management Team class titles. Purpose of the market
survey was to adjust pay grades for EMT classifications.
Surveyed were the 13 comparable agencies gathering information on job
titles, pay range minimum and maximum, and car allowance amount if
applicable. Car allowance amounts were then added to the market survey
range maximum.
Adjusted pay grades for the EMT classifications were then determined by
looking at the EMT pay range maximum that was closest to the 75th
percentile of the market survey data.
For the Communications Services Manager the 75th percentile of the
market amounted to $118, 548. The closest pay range maximum to that
arnount was Pay Grade (PG) 94 with a range maximum of $120,012.
Based on this data, the position was adjusted to PG 94 having a 25%
range spread.
In April 2004 Administrative Services responsibilities was added to the
position of Communications Services Manager. With these additional
responsibilities, the position title changed to Director of Communications &
Administrative Services.
An assessment of the additional responsibilities was conducted through a
job analysis. Based on that job analysis assessment, an internal
comparative approach was utilized in determining the most appropriate
pay range placement.
With the internal comparative approach, it was important to recognize the
additional responsibilities of the Administrative Services Division. The
most appropriate pay range placement was accomplished by placing the
position at Pay Grade (PG) 101 ($7,557 - $11 ,336) having a 50% range
spread as all other Executive Management positions. See Attachment 2.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
The additional cost for the salary increases as a result of the reclassifications having
incumbents, and range placement movement of the Director position for the remainder
of FY04/05 (November 26 to June 30) is 59,180.
Annualized cost of the salary increases as a result of the reclassifications having
incumbents, and range placement movement of the Director position is $15,912.
Page 2
BUDGETIMPACT
® This item has been budgeted
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted
❑ Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
Maintain current classifications, and adjust duties to be consistent within current
classifications. Vacant positions to remain the same.
Director of Communications & Administrative Services remains in current pay range.
CEQA FINDINGS
N/A
ATTACHMENTS
1. November 2004 Reclassification Cycle Summary
2. Executive Pay Schedule — Pay Range for Pay Grade 101
Page 3
Attachment 1
November 2004 Reclassification Cycle Summary
Reclassifications
Employee Division Current Classification Proposed Classification Supporting Data
Senior Public Information Reclassification Recommended.
Cabral,Jennifer 130 Public Information Specialist Specialist Performing duties of recommended
classification for at least 6 months.
Reclassification Recommended.
Sohanaki,Roya 640 Associate Engineer III Engineer Performing duties of recommended
classification for at least 6 months.
Position Upgrade
Divisionj Current Classification I Upgraded Classification
640 Senior Engineer Engineering Supervisor
ATTACHMENT 2 EXECUTIVE PAY SCHEDULE
as of 07/09/04
Pay Grade I 1st Quartile 2nd Quartile Midpoint 3rd Quartile 4th Quartile
101 $90,688-$102,024 $102,025-$113,360 $113,361 $113,361 -$124,696 $124,697-$136,033
COMPONENTS OF PAY GRADE RANGE
1. The Executive Pay Schedule has a 50% range spread from the minimum of the range to the maximum of the
range.
2. The 50% range spread is broken into 4 sections called Quartiles.
3. Each Quartile has an associated percentile and range spread.
4. The Midpoint or 50th percentile is considered the middle value of average salary data that companies report.
5. The maximum of the range labeled the 4th Quartile, is equivalent to the 75th percentile of the market at whicl
all District pay range maximums are set.
6. The 62nd percentile of the market 75th is equivalent to the top of the 3rd Quartile.
SAMPLE PAY GRADE RANGE
25"' Percentile 50th 76"' Percentile
Percentile
1st 2nd I 3rd 4th
PAY Quartile Quartile Quartile Quartile
GRADE MINIMUM MIDPOINT MAXIMUM
°.. ' , .✓a. r
20 $24,500-$28,174 $28,175-$31,849 $31,850 $31,850-$35,524 $35,525-$39,270�0
wak.:i' •r 's y"L t tz,. ." a:c-•'' x x ..K..: . i r i .`"rC- RM,
21 $26,950-$30,992 $30,993-$35,034 $35,035 $35,035-$39,079 $39,080-$43,120
FA H R COMMITTEE Meeting Date To Bd.of Dir.
11/10/04 11/17/04
AGENDA REPORT Item Number Item Number
FAHR04-101 14(g)
Orange County Sanitation District
FROM: Blake Anderson, General Manager
SUBJECT: NON-BASE BUILDING PAYMENT
GENERAL MANAGER'S RECOMMENDATION
Approve a one time only non-base building payment for the Director of Technical
Services in an amount not to exceed $7,948 for his service as Acting General Manager.
SUMMARY
Approve a one time only non-base building payment for the Director of Technical
Services in an amount not to exceed S7,948 for his service as Acting General Manager.
The General Manager began a medical leave of absence on September 1,
2004. The medical leave of absence is ending on October 18, 2004 for a total
of eight work weeks.
During this time period, the Director of Technical Services has assumed the
duties of the General Manager, while at the same time continuing to handle
his normal duties as Director of Technical Services.
Current policy is silent at the Executive Management and Manager level
regarding additional compensation for Directors and Managers who assume
the responsibilities of an Executive Management position for an extended
period of time.
As an Executive Management employee, awarding the incumbent a one-time
only non-base building payment will recognize the employee for assuming the
additional duties of the higher level position. The assumption of these
additional duties has been critical in ensuring the District's operations
continued without interruption.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
Applying a one time only non-base building payment is based on an amount equal to
4.567% of base salary resulting in a payment of S7.948.
Page 1
BUDGET IMPACT
® This item has been budgeted
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted
❑ Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
Do not approve the recommended non-base building payment.
CEQA FINDINGS
N/A
ATTACHMENTS
None
Page 2
FAH R COMMITTEE Meeting Date To Bd.of Dir.
11/10/0-1 11/17/04
AGENDA REPORT Item Number Item Number
FAHRN-102 14(h)
Orange County Sanitation District
FROM: Carol Beekman, Director of Communications & Administrative Services
Originator: Dionne Kardos, Public Information Specialist
SUBJECT: CORPORATE IDENTITY AND PUBLIC AWARENESS PROJECT
GENERAL MANAGER'S RECOMMENDATION
Authorize the General Manager to solicit Requests for Proposal and subsequently
award a Consultant Services Agreement for Phase 2 of the Corporate Identity and
Public Awareness Project, Specification No. CS-2003-16213D, in the amount not to
exceed $20,000, as discussed in project summary below.
SUMMARY
OCSD researched the need for and the potential merits of updating its corporate
identity (agency name and logo). The completed Phase 1 research work included
interviews with Board members and employees, examination of peer agencies, news
media review, and both qualitative and quantitative research, focus groups and
telephone surveys among residential customers. The consultant who conducted
Phase 1, JohnsonlUkropina, will present the research findings. Their final report is
attached.
Based on this baseline information, staff recommends no change in OCSD's name or
logo, but to add a tag line to clarify our organization's services/products. Research
findings conclude that our current company name does not deliver additional
messaging to our customers. The goal of adding the tagline is to promote a positive
agency image and identity to the public and other target audiences.
This research was specifically conducted to obtain perceptions on the OCSD identity.
However, the study has uses beyond this project—providing valuable insights into
what our stakeholders think about OCSD, when they think of us, what they believe we
do, and what they want from us. It provides input into our communications and
outreach efforts—telling us how stakeholders perceive us and what their priorities are
when it comes to water.
PRIOR COMMITTEE/BOARD ACTIONS
In December 2003 the FAHR Committee recommended and at the February 25. 2004
Board Meeting it was approved to award a contract for S50,000 for Phase 1 research.
PROJECT/CONTRACT COST SUMMARY
Funding for recommended Phase 2 work, not to exceed S20.000, would include
outside professional consulting services to research and develop a tagline. which
includes conducting an audit of OCSD's current identity (compiling and reviewing all
logos and name applications. project associations, and branded collateral
materials/items that are under OCSD's jurisdiction), and developing an
internal/external corporate identity standards manual.
H\dep1\agendaTAHRTAHR2004\1 1 04104-1 02 Gorporale ID doc
Revised 06104/03 Page 1
BUDGET IMPACT
If approved. S20,000 will come from general manager's contingency fund.
ALTERNATIVES (and estimated consultant costs)
1.) No change in name or logo, no tag line, develop identity standards manual
only. With this option nothing is changed and subsequent phases of this program
would entail the building of a brand identity manual that includes the brand personality
of the agency as well as the graphic standards for use of the existing name and the
existing logo. Cost implication for building the manual is estimated from $5,000 to
$7,500.
2.) Keep the name and change the logo. Under this scenario only the logo would be
changed with the aim of bringing clarity of mission/scope to agency communication.
Estimate for an organization the size of OCSD is $25,000-$50,000, plus the cost for
developing an identity standards manual. As with Alternative 1, implementation costs
could not be estimated with the data available.
3.) Change the name and change the logo. This implies and entails a massive
effort, not just in developing a new name and logo to satisfy all the requirements of the
agency's mission, strategies and positioning. but also the myriad of stakeholders in
the process. As with Alternative 2. this can be a costly project. Estimates are in the
$35,000 to S75.000 range, plus the cost for developing an identity standards manual
with implementation costs unknown.
CEQA FINDINGS
N/A
ATTACHMENT
OCSD Corporate Identity Program Phase 1 Final Report, dated 10/04/04 submitted
by Johnson IUkropina.
CB dk
H\dept\agenda\FAHRIFAHR2004N 104104-102 Corporate ID doc
Revised 06/04/03 Page 2
FA H R COMMITTEE Meeting Date To Bd. of Dir.
11/10/2004 11/17/2004
AGENDA REPORT Item Number Item Number
FAHR04-103 14(i)
Orange County Sanitation District
FROM: Gary Streed, Director of Finance
Originator: Michael White, Controller
SUBJECT: ORANGE COUNTY SANITATION DISTRICT COMPREHENSIVE ANNUAL
FINANCIAL REPORT (CAFR) FOR THE YEAR ENDED JUNE 30. 2004
GENERAL MANAGER'S RECOMMENDATION
Receive, file and approve the District's Comprehensive Annual Financial Report (CAFR) for the
year ended June 30, 2004, prepared by staff and audited by Moreland and Associates, Certified
Public Accountants.
SUMMARY
The District's independent auditors, Moreland & Associates, have completed their examination
of the District's financial statements for the year ended June 30, 2004 and have again issued an
unqualified opinion. Each year, the FAHR Committee reviews the results of the audit and the
corresponding Auditor's report to the Committee. Michael Moreland, Partner, will attend the
meeting to respond to any questions of Directors.
This year, staff has again prepared the Comprehensive Annual Financial Report that includes
the audited financial statements. For the last ten years. the District has earned the Certificate of
Achievement for Excellence in Financial Reporting from the Government Finance Officers
Association (GFOA). This year's report will again be submitted to GFOA for their review in
anticipation of another award.
The Comprehensive Annual Financial Report, including the Auditor's opinion letter, the Auditor's
Report to the Committee, the Auditor's Report on Compliance and on Internal Control Over
Financial Reporting, and the Auditor's Appropriations Limit Report are attached.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This itern has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
H.\dept\agenda\FAHR\FAFIR2004\1104\04-103.CAFR doc
Revised 8120/98 Page 1
ADDITIONAL INFORMATION
None.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1 . Comprehensive Annual Financial Report for the year ended June 30, 2004.
2. Report on Compliance and on Internal Control Over Financial Reporting.
3. Auditors' Report to the FAHR Committee.
4. Independent Accountants' Report on Agreed-Upon Procedures Applied to
Appropriations Limit Worksheets.
H\dep1\agenda\FAHRTAHR2004\1 1 04104-1 03 CAFR doc
Revised 8/20198 Page 2
t
1201 DOVE STREET,SUITE 660
,f/, , _ -_f //jj NE'�JPORT BEACH,CALIFORNIA 92660
or�land eXYa4(1G�(GI elru% (949)221-0025
lVJL CERTIREG PUSUC ACCOUNTANTS 570 RANCHEROS DRIVE.SUITE 260
SAN MARCOS.CA 92069
(760)752.3390
September 3, 2004
The Board of Directors of the
Orange County Sanitation District
Report on Compliance and on Internal Control Over Financial Reporting
Based on an Audit of Basic Financial Statements Performed in
Accordance With Government Auditing Standards
We have audited the basic financial statements of the Orange County Sanitation District
(District) as of and for the year ended June 30, 2004, and have issued our report thereon
dated September 3, 2004. We conducted our audit in accordance with auditing standards
generally accepted in the United States of America and the standards applicable to financial
audits contained in Government Auditing Standards issued by the Comptroller General of the
United States.
Compliance
As part of obtaining reasonable assurance about whether the District's basic financial
statements are free of material misstatement, we performed tests of its compliance with
certain provisions of laws, regulations, contracts and grants, noncompliance with which
could have a direct and material effect on the determination of financial statement amounts.
However, providing an opinion on compliance with those provisions was not an objective of
our audit and, accordingly, we do not express such an opinion. The results of our tests
disclosed no instances of noncompliance that are required to be reported under Government
Auditing Standards.
Internal Control Over Financial Reporting
In planning and performing our audit, we considered the District's internal control over
financial reporting in order to determine our auditing procedures for the purpose of
expressing our opinion on the financial statements and not to provide assurance on the
internal control over financial reporting. Our consideration of the internal control over
financial reporting would not necessarily disclose all matters in the internal control over
financial reporting that might be material weaknesses. A material weakness is a condition in
which the design or operation of one or more of the internal control components does not
reduce to a relatively low level the risk that misstatements in amounts that would be material
in relation to the basic financial statements being audited may occur and not be detected
within a timely period by employees in the normal course of performing their assigned
functions. We noted no matters involving the internal control over financial reporting and its
operation that we consider to be material weaknesses.
This report is intended solely for the information and use of the Board of Directors and
management of the District and is not intended to be and should not be used by anyone other
than these specified parties.
t
1201 DOVE STREET,SUITE 680
NEWPORT BEACH,CALIFORNIA 92660
Moreiand �'��� r�s"'. i949)221-0025
CERTIFIED PUBLIC ACCOUNTANTS 570 RANCHEROS DRIVE,SUITE 260
SAN MARCOS CA 92069
(760)752-3390
September 3, 2004
The Finance,Administration and
Human Resources Committee of
the Orange County Sanitation District
We have audited the basic financial statements of the Orange County Sanitation District
(District) for the year ended June 30, 2004, and have issued our report thereon dated September
3, 2004. Professional standards require that we provide you with the following information
related to our audit.
Our Responsibility under Generally Accented Auditing Standards and Government Auditing
Standards
Our responsibility as described by professional standards is to plan and perform our audit to
obtain reasonable, but not absolute, assurance that the financial statements are free of material
misstatement and are fairly presented in accordance with accounting principles generally
accepted in the United States of America. Because of the concept of reasonable assurance and
because we did not perform a detailed examination of all transactions, there is a risk that
material errors, irregularities, or illegal acts, including fraud and defalcations,may exist and not
be detected by us.
As part of our audit,we considered the internal control of the District. Such considerations were
solely for the purpose of determining our audit procedures and not to provide any assurance
concerning such internal control.
As part of obtaining reasonable assurance about whether the financial statements are free of
material misstatement, we performed tests of the District's compliance with certain provisions
of laws, regulations, contracts and grants. However, the objective of our tests was not to
provide an opinion on compliance with such provisions.
Other Information in Documents Containing Audited Financial Statements
Our responsibility for other information in documents containing the District's basic financial
statements and our report thereon does not extend beyond financial information identified in
our report, and we have no obligation to perform any procedures to corroborate other
information contained in these documents. We have, however, read the other information
included in the District's comprehensive annual financial report; and no matters came to our
attention that cause us to believe that such information, or its manner of presentation, is
materially inconsistent with the information, or its manner of presentation, appearing in the
financial statements.
1
I
The Finance,Administration and +
Human Resources Committee of
the Orange County Sanitation District
September 3,2004
Page 2
Significant Accounting Policies
Management has the responsibility for selection and use of appropriate accounting policies. We
will advise management about the appropriateness of accounting policies and their application.
The significant accounting policies of the District are described in Note 1 to the basic financial
statements. No new accounting policies were adopted and the application of existing policies
was not changed during the year.
We noted no transactions during the year that were both significant and unusual, or transactions
for which there is a lack of authoritative guidance or consensus.
Management Judgments and Accounting Estimates
Accounting estimates are an integral part of the financial statements prepared by management
and are based upon management's knowledge and experience about past and current events and
assumptions about future events. Certain accounting estimates are particularly sensitive because
of their significance to the financial statements and because of the possibility that future events
affecting them may differ significantly from those expected. The most sensitive estimates
affecting the financial statements were the liabilities associated with general liability and
workers' compensation claims.
Management's estimate of the claims payable liabilities related to general liability and workers'
compensation claims is based on reports prepared by third party administrators summarizing
the estimated liability for workers' compensation and the reports prepared by District staff
summarizing historical loss levels for general liability claims against the District. We evaluated
the key factors and assumptions used to develop liabilities associated with general liability and
workers' compensation claims recorded in determining that they are reasonable in relation to
the financial statements taken as a whole.
Audit Aduustments
For purposes of this letter, professional standards define an audit adjustment as a proposed
correction of the financial statements that, in our judgment, may not have been detected except
through our auditing procedures. An audit adjustment may or may not indicate matters that
could have a significant effect on the District's financial reporting process (that is, cause future
financial statements to be materially misstated). We proposed no adjustments that indicate
matters that could have a significant effect on the District's financial reporting process.
2
t
f The Finance,Administration and
Human Resources Committee of
the Orange County Sanitation District
September 3,2004
Page 3
Disagreements With Mana ement
There were no disagreements with management on financial accounting, reporting or auditing
matters that, if not satisfactorily resolved, would have caused a modification to our auditors'
report on the District's financial statements.
Consultation With Other Accountants
In some cases, management may decide to consult with other accountants about auditing and
accounting matters, similar to obtaining a "second opinion" on certain situations. If a
consultation involves application of an accounting principle to the governmental unit's financial
statements or a determination of the type of auditors' opinion that may be expressed on those
statements, our professional standards require the consulting accountant to check with us to
determine that the consultant has all the relevant facts. To our knowledge, there were no such
consultations with other accountants.
Major Issues Discussed With Management Prior to Retention
We generally discuss a variety of matters, including the application of accounting principles
and auditing standards, with management each year prior to retention as the District's auditors.
These discussions occurred in the normal course of our professional relationship, and our
responses were not a condition to our retention.
This information is intended solely for the information and use of the Committee, Board of
Directors and management of the District and is not intended to be and should not be used by
anyone other than these specified parries.
3
a
1201 DOVE STREET,SUITE 680
Ar NEWPORT BEACH,CALIFORNIA 92660
oreland (949)221.0025
CERTIFIED PUBLIC ACCOUNTANTS 570 RANCHEROS DRIVE.SUITE 260
SAN MARCOS,CA 92069
(760)752-3390
September 3,2004
The Finance, Administration
and Human Resources Committee of
the Orange County Sanitation District
Independent Accountants' Report on Agreed-Upon Procedures
Applied to Appropriations Limit Worksheets
We have performed the procedures enumerated below to the accompanying Appropriations
Limit worksheet No. 6 (or other alternative computation) of the Orange County Sanitation
District(District)for the year ended June 30,2004. These procedures,which were agreed to
by the District and the League of California Cities (as presented in the League publication
entitled Article MIB Appropriations Limitation Uniform Guidelines),were performed solely
to assist the District in meeting the requirements of Section 1.5 of Article XIIIB of the
California Constitution. The District's management is responsible for the Appropriations
Limit worksheet No. 6 (or other alternative computation). This agreed-upon procedures
engagement was performed in accordance with attestation standards established by the
American Institute of Certified Public Accountants. The sufficiency of the procedures is
solely the responsibility of those parties specified in this report. Consequently, we make no
representation regarding the sufficiency of the procedures described below either for the
purpose for which this report has been requested or for any other purpose.
The procedures performed and our findings were as follows:
1. We obtained the completed worksheets No. 1 through No. 7 (or other alternative
computations) and compared the limit and annual adjustment factors included in those
worksheets to the limit and annual adjustment factors that were adopted by resolution of
the Board of Directors. We also compared the population and inflation options included
in the aforementioned worksheets to those that were selected by a recorded vote of the
Board of Directors.
Finding: No exceptions were noted as a result of these procedures.
i
A
The Finance,Administration
and Human Resources Committee of
the Orange County Sanitation District
September 3,2004
Page 2
2. For the accompanying Appropriations Limit worksheet No. 6, we added line A, last
year's limit, to line E, total adjustments, and compared the resulting amount to line F,
this year's limit.
Finding: No exceptions were noted as a result of these procedures.
3. We compared the current year information presented in the accompanying
Appropriations Limit worksheet No.6 to the other worksheets described in No. 1 above.
Finding: No exceptions were noted as a result of this procedure.
4. We compared the prior year appropriations limit presented in the accompanying
Appropriations Limit worksheet No.6 to the prior year appropriations limit adopted by
the Board of Directors during the prior year.
Finding: No exceptions were noted as a result of this procedure.
We were not engaged to and did not conduct an examination,the objective of which would be
the expression of an opinion on the accompanying Appropriations Limit worksheet No.6(or
other alternative computation). Accordingly, we do not express such an opinion. Had we
performed additional procedures,other matters might have come to our attention that would
have been reported to you. No procedures have been performed with respect to the
determination of the appropriation limit for the base year,as defined by Article XIII-B of the
California Constitution.
This report is intended solely for the information and use of the Board of Directors and
management of the District and is not intended to be and should not be used by anyone other
than these specified parties.
4
ORANGE COUNTY SANITATION DISTRICT
APPROPRIATIONS LIMIT WORKSHEET#6
FY 2003 —2004
BUDGET
AMOUNT
A. LAST YEAR'S LIMIT, as adopted 1 $59,660,000
B. ADJUSTMENT FACTORS
1. Population % 2.02%
2. Inflation % 0.59%
Total Adjustment% 1 2.62%
C. ANNUAL ADJUSTMENT$ $1,559,000
D. OTHER ADJUSTMENTS:
Assumed Responsibility-Booking Fees
Property Tax Collections
(Lost Responsibility)
(Transfer to Private)
(Transfer to Fees)
Sub-total -
E. TOTAL ADJUSTMENTS -
F. CURRENT YEAR LIMIT $61,219,000
4 r
FA H R COMMITTEE Meeting Date To Bd. of Dir.
10/13/04 11/17/04
AGENDA REPORT Item Number Item Number
FAHR04-91 15
Orange County Sanitation District
FROM: Gary Streed, Director of Finance/Treasurer
SUBJECT: PERMIT USER RATES FOR FLOW, BIOCHEMICAL OXYGEN DEMAND
AND SUSPENDED SOLIDS
GENERAL MANAGER'S RECOMMENDATION
Adopt Ordinance No. OCSD-24, An Ordinance of the Board of Directors of Orange County
Sanitation District, Adopting Revised Table G re Permittee Charges for Use and Reaffirming All
Other Charges:
"An Ordinance of the Board of Directors of Orange County Sanitation District
Establishing Sanitary Sewer Service Charges: Establishing Capital Facilities Capacity
Charges; Adopting Miscellaneous Charges and Fees relating to Industrial Charges,
Source Control Permittees and Wastehaulers; and Repealing Ordinance No. OCSD-22".
SUMMARY
In July, staff advised the Board that we discovered an inappropriate credit had reduced
the calculation of the rates that individual Permit Users pay to compute their annual
sewer service charge based upon their actual flow. BOD and SS discharge. The total
funds that needed to be raised for the year had been reduced by the total property taxes
that were expected, while each Permit User's actual annual bill was subsequently
reduced by their actual property taxes allocated to the District. Correcting this double
credit was expected to recover approximately S1.7 million per year.
In order to brief the Board in July, the staff work behind the recommended solution to
this property tax credit calculation was rushed: the immediate computation was
addressed, but the opportunity to review the entire calculation was deferred. In the time
between the first reading of the proposed Ordinance and the second reading in August,
staff completed that analysis, developed additional recommendations and asked that
consideration of the Ordinance be postponed until October when a detailed explanation
of the calculation and the formula could be provided.
At the September FAHR Committee meeting, staff presented a revised formula and
rates that were based upon the Validated Capital Improvement Plan through 2020 that
was developed subsequent to the Board's decision to meet secondary treatment
discharge standards, the actual O&M costs of 2003-04. and the budgetary requirements
for 2004-05. This formula excluded the reduction of total needs by property tax
receipts. The Committee was generally supportive of this methodology. The remaining
question was whether or not it was appropriate to include the cost of CIP projects for
additional capacity in these rates.
Staff has reviewed that question and determined that additional capacity projects should
be excluded from the calculation. In 2003-04, the Board adopted a new methodology to
calculate Capital Facilities Capacity Charges (CFCCs) that is based entirely upon the
projected increased flow and demand and the cost of facilities to meet those
requirements. Additionally. Permit Users who exceed their baseline capacity rights are
required to pay Supplemental Capital Facilities Capacity Charges to fund the additional
facilities that they will require. Because these additional capacity projects are now
funded from special fees. staff believes it is inappropriate to include them in the Permit
User fee rates.
This report will explain the process of calculating the Permit User rates, will discuss the
various assumptions involved, will evaluate alternative calculation methods and will
present the staff recommendation for a thorough discussion by the FAHR Committee.
PRIOR COMMITTEE/BOARD ACTIONS
1. The Committee reviewed and recommended rates for 2004-05 in April, 2004, and
those rates were adopted by the Board.
2. In July 2004, the Board introduced Ordinance No. OCSD-24 for first reading.
3. In August 2004, the Board deferred consideration of adoption of Ordinance No.
OCSD-24 until October 2004.
4. In September 2004. the Committee reviewed alternative rate calculation methods
and requested evaluation of an additional alternative.
PROJECT/CONTRACT COST SUMMARY
The financial cost to the District of implementing the staff recommendation will be
minimal. A notice of the proposed rates will need to be mailed to every Permit User
informing them of the change that is proposed and the rates that are projected for
2004-05, 2005-06. 2006-07 and 2007-08. Of course. the Board will consider these
rates separately each year along with the annual sewer service fee rates. Providing the
notice through 2007-08. will put all users on the same notification schedule.
The cost to some Permit Users will be significant. A schedule is attached that estimates
the total annual cost to each Permit User during the planning period.
There will be additional, but unquantified costs to the District from explaining these
costs to various Permit Users.
There will be additional revenues to the District from the Permit Users who have
benefited from the inappropriate reduction of rates by the amount of property tax
receipts.
H\depl\agenda\Board Agenda Reports\2004 Board Agenda Reports\1104\Item 15 Ordinance 24,doc
Revised 06/04/03 Page 2
V,
BUDGETIMPACT
® This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Since the inception of the Permit User Fee program in 1970, users of the District's
system that discharge high volumes or high strength wastewater have been required to
obtain a discharge permit (either a Class I or Class II Permit) and to pay extra fees for
the cost of service. The fees are initially calculated on the basis of actual flow, BOD
and SS discharged to the sewer and subsequently reduced by the actual property taxes
they have paid to the District. This practice was intended to ensure that these users
paid their actual cost of service through a combination of user fees and property taxes.
There are approximately 500 Permit Users that pay for sewer services based upon their
actual flow, BOD and SS. The individual user rate that was adopted for 2004-05 for
each of these parameters was calculated based upon net revenue requirements for
O&M and the CIP, after subtracting other projected revenues, including property taxes,
from our total revenue or spending requirements. In July, staff recommended that it
was appropriate to modify the computation of the rates for flow, BOD and SS so that
Permit Users were not allowed two reductions for property taxes.
The attached staff report provides a very detailed accounting of the steps involved to
calculate the individual rates for flow, BOD and SS for Operations & Maintenance
(O&M) expenses, the CIP and for Certificate of Participation (COP) Service. The most
important factors or allocations that are used in the calculations are shown in the
following table.
Cost Parameter Allocations
Collection Treatment& Collection Treatment&
System O&M Disposal O&M System CIP Disposal CIP COP Service
Flow 50% 12% 90% 35% 50%
BOD 34% 10% 33% 27%
SS 50% 54% 32% 23%
Requirement- $22,605,790 1 $86,614,140 1 $5,199,433 1 $19,799,969 1 $38,757,502
The theory, philosophy, formula and allocations were used to estimate the individual
Permit User rates for 2004-05 and the following three fiscal years. All of these
calculations are based upon the cash flow projections in the 2004-05 budget. The
actual rates for the years beyond 2004-05 will be brought to the Board as a part of each
year's financial actions; they are not a part of this action.
H:1dep1%agendMBoard Agenda Reports12004 Board Agenda Repons111WItem 15.Ordinance 24.doc
Revised: 06/04/03 Page 3
1
t
Adopted Proposed Estimated Estimated Estimated ,p
Description 2004-05 2004-05 2005-06 2006-07 2007-08
Flow per m $368.58 $577.30 $637.55 $711.27 $773.32
BOD per 1000 lb $248.55 $270.68 $288.50 $311.21 $330.53
SS per 1000 lb $238.45 $414.27 $432.14 $454.19 $473.50
Avg. Permit User @ $18,784.67 $25,395.71 $27,213.12 $29,475.80 $31,400.84
14 mg, 40k#, 16k#
Estimated Total $8,490,633.10 $11,478,852.42 $12,300,318.42 $13,323,050.89 $14,193,168.90
Fees Using 2002-03
Quant.
ALTERNATIVES
Alternatives are discussed in the attached staff report and include different effective
dates for the Permit User rates, changing the allocation of costs to flow, BOD and SS in
some or all cost categories, and various reductions to the budgeted requirements.
CEQA FINDINGS
N/A
ATTACHMENTS
1. Staff Report
2. Schedule of Estimated Impact on Permit Users By Flow, BOD and SS
3. Schedule of Estimated Impact on Permit Users to 2007-08
4. Permit User Rate Calculation Model (4)
5. Average "Cash-Funded" Validated Capital Improvement Program
6. Allocation of 2003-04 Treatment and Disposal Costs to Flow, BOD and SS
7. Allocation of Validated Capital Improvement Program to Flow, BOD and SS
8. Expense and Cost Allocations
9. Memo from General Counsel dated October 20, 2004
10.Ordinance No. OCSD-24
GGS
Mdepl%agendalBoard Agenda Reports12004 Board Agenda Reports111041 Iem 15.Ordinance 24.doc
Revised: 06/04/03 Page 4
HS SAW
O 1
VWV
Ol ,
hg iH
October 13, 2004
STAFF REPORT
Calculation of Permit User Rates
For Flow, Biochemical Oxygen Demand and Suspended Solids
Since the inception of the Permit User Fee program in 1970, users of the
District's system that discharge high volumes or high strength wastewater have
been required to obtain a discharge permit (either a Class I or Class 11 Permit)
and to pay extra fees for the cost of service. These extra fees are initially
calculated on the basis of actual flow, biochemical oxygen demand (BOD) and
suspended solids (SS) discharged to the sewer and that calculated total is
subsequently reduced by the actual property taxes they have paid to the District.
This practice was intended to ensure that these users paid their actual cost of
service through a combination of user fees and property taxes.
There are approximately 500 Permit Users that pay for sewer services based
upon their actual flow, BOD and SS discharge to the sewer. The individual user
rate that was adopted for 2004-05 for each of these parameters was calculated
based upon net revenue requirements for operations and maintenance (O&M)
and the validated capital improvement program (CIP), after subtracting other
projected revenues, including property taxes, from our total revenue and
spending requirements. In July, staff recommended that it was appropriate to
modify the computation of the rates for flow, BOD and SS so that Permit Users
were not allowed two reductions for property taxes.
During the past few months, staff has re-evaluated each of the assumptions that
are involved in calculating these rates. Central to this process was the goal to
verify how our costs are allocated to, or based upon, flow, BOD and SS. This
report contains the results of those evaluations. Attached to this report is a
spreadsheet that calculates the proposed rates for 2004-05. Each of the lines in
this spreadsheet is numbered for reference and those line numbers are included
in the descriptions that follow.
Component Costs
There are five component costs that must be funded each year. These are: O&M
in the collection system, O&M in the treatment plants, CIP in the collection
system, CIP in the treatment plants and certificates of participation (COP)
OCSD P.O.Box 8127 : Fountain Valley,CA 92728-8127 (714)962.2411
Calculation of Permit User Rates
Page 2 of 6
October 13, 2004
service. Each of these components must be allocated to flow, BOD or SS before
rates can be calculated. A column is included in the attached spreadsheet for
each of these types of costs.
O&M in the collection system has historically been allocated 100% to flow
because there is no treatment or removal of BOD or SS in the sewers. A closer
review of the sewage transportation process and of a change in budget
preparation methods has led to a change in these allocations. Line cleaning
expenses are allocated to solids, the new FOG program is allocated 70% to
solids and the odor control program is allocated 90% to solids. When these
allocation percentages are applied to the 2004-05 budget, the resultant overall
percentages are 50% flow and 50% solids. (Column A, lines 1, 7, 8-11)
CIP in the collection system has also historically been allocated 100% to flow.
However, because some of the rehabilitation, refurbishment and replacement
work in the sewers has been caused by gasses in the wastewater that are
formed from the BOD, 10% of the collection system CIP is allocated to BOD in
accordance with recommendations in the Interim Strategic Plan Update.
Adjustments to the budgeted CIP are discussed later in this report. (Column B,
lines 1, 7, 8-11)
O&M in the treatment plant allocation percentages are calculated each year
based upon the actual expenses from the year before. Each of the major unit
processes (preliminary treatment, primary treatment, secondary treatment, solids
disposal, effluent disposal) are allocated appropriately to flow, BOD or SS in
order to calculate an average allocation for the year. Based upon the actual
costs for 2003-04, the 2004-05 budget for treatment plant expenses is allocated
12% to flow, 33% to BOD and 54% to SS. (Column C, lines 1, 7, 8-11)
CIP in the treatment plant is the most difficult to properly allocate. Every Master
Plan or Strategic Plan requires the engineering team to evaluate every project
that is proposed for the planning period and to develop the appropriate allocation
ratio for that project. For example, a headworks project would be allocated 75%
to flow— 5% to BOD — 20% to SS, while a secondary treatment project would be
allocated 93% to BOD — 7% SS. When all of the projects have been allocated, a
weighted average is determined for the CIP through the planning period. These
weighted averages may differ for each Strategic Plan based upon the level of
treatment proposed or other major Board decisions. The result of this effort for
the Validated Capital Improvement Program in 2003 for the treatment plants,
after removing the projects for new capacity, is 35% to flow— 33% to BOD — 32%
to SS. Adjustments to the budgeted CIP are discussed later in this report.
(Column D, lines 1, 7, 8-11)
COP service is the principal and interest we pay on the money we borrow in the
municipal finance market. The District borrows only for the CIP, not for O&M.
Calculation of Permit User Rates
Page 3 of 6
October 13, 2004
Because the COP (debt) service is related exclusively to the CIP and to the
entire CIP, the annual payments are allocated to flow, BOD and SS based on the
weighted average of the CIP for the collection system and for the treatment
plants after removing the projects for additional capacity. This average is 50% to
flow— 27% to BOD —23% to SS. (Column D, lines 1, 7, 8-11)
These allocation percentages are applied to the projected expenses or costs of
the collection system O&M, treatment plant O&M and COP service in order to
determine the total allocation of funding requirements to flow, BOD and SS.
(Columns A-E, lines 12-16)
Capital Improvement Program Adjustments
The CIP for the planning period through 2020 is very much higher in the first few
years than in the later years. In order to avoid an immediate rate spike when the
CIP is the highest, the average annual CIP through 2020 is used to calculate the
rates. In addition to avoiding an immediate rate spike, this method will provide
for smooth rate increases over time. For example, the average CIP for the
planning period is about $150 million, while the budgeted CIP for 2004-05 is over
$231 million. (Columns B & D, line 1)
At the September FAHR Committee meeting, the Directors were advised that
total and average Validated CIP requirements that were included in the rate
alternatives that were being reviewed included all of the projects, including those
for additional capacity. The Board had previously adopted a policy to fund
additional capacity projects from Capital Facilities Capacity Charges (CFCCs)
and Supplemental CFCCs collected from new and expanding users. Because
these additional capacity projects will not be built unless there is an increase in
demand and because there is an alternative method of funding them, these
projects have been removed from the Permit User rate calculation. This change
removes $862 million of requirements over the planning period to 2020.
Not all of our CIP is initially funded through user fees or CFCCs. The Board has
decided to fund $1.4 billion of the CIP by borrowing. This is approximately 56%
of the Validated CIP through 2020. Borrowing defers the need for user fees.
Because we include the annual COP service in the user fee rate calculation, it is
appropriate to reduce the budgeted CIP outlay by 56% to avoid double counting
the CIP and the COP service. This recognition of the requirement to include only
the "cash-funded" CIP reduces the average annual VCIP requirement by $54
million.
A separate schedule of the adjustments to the Validated CIP discussed above is
included with this package. (Columns B & D, lines 3-4)
}
Calculation of Permit User Rates
Page 4 of 6
October 13, 2004 °
Impact of Revenues
At this point, the adjusted cash needs for the year have been determined; they
have been allocated to flow, BOD and SS. Rates could be calculated for each of
these wastewater parameters. However, it seems to be appropriate or fair to
reduce these total needs by projected revenues from other sources, notably
interest income and connection fees (Capital Facilities Capacity Charges or
CFCCs). While income from these sources does not reduce the cost of service,
it does reduce the total amount of revenue needed from all other sources.
Interest income is basically earned on the average District reserves, or cash
balances, during the year. Because the annual O&M needs are funded
completely each year by user fees collected that year and our reserves are
principally held to meet future capital needs, the annual interest income has been
allocated to Collection System CIP, Treatment Plant CIP and COP Service.
Once in these three categories, the interest income is allocated to flow, BOD and
SS in the ratio of the capital improvement program requirements. The interest
income budget for 2004-05 was $20.5 million. (Columns B, D & E, line 6)
Connection fees (CFCCs) are collected from new or expanding users to fund CIP
for additional capacity projects. Because the additional capacity projects were
removed from the Validated CIP in this rate calculation model, no adjustment
should be made for the budgeted connection fee revenues.
Quantities of Flow, BOD and SS
Each Master Plan or Strategic Plan contains a flow projection for the planning
period. The current Strategic Plan projection is for an average daily flow of 321
million gallons in 2020. Each year this projection is reviewed by staff and a flow
estimate for the next year is developed. The current estimate for 2004-05 is 250
million gallons per day or 91,250 million gallons per year (91 billion). (Column
"Description," line 18)
The average BOD and SS concentration is reported each year in the O&M
Annual Report for each plant along with the actual flow. The concentration for
each is converted to mass, in pounds, for each plant and then divided by the total
actual flow to develop a weighted average concentration for both BOD and SS
for the combined treatment plants. The most recent, 2002-03, annual average
concentration for BOD was 228 milligrams per liter and the concentration for SS
was 232.6 milligrams per liter. These concentrations are then combined with the
budgeted flow to determine the budgeted pounds of BOD and SS. (Column
"Description," lines 19 & 20)
Individual Rate Calculations
Dividing the total requirement for flow by the total budgeted flow produces a rate
for flow. The same process is followed for BOD and SS. These rates would
Calculation of Permit User Rates
Page 5of6
o October 13, 2004
generate all the funds required for the average year if every user was billed
based upon actual flow, BOD and SS. (Columns A, B, C, D & E, lines 18-20)
Change from Prior Calculation Model
Beginning in 1998-99, an additional step was added to reduce the parameter
rates even more. The intent of this adjustment was to make the Permit User
parameter rates equivalent to those implicit in the annual flat rate sanitary sewer
service user fee. These individual rates are the de facto rates paid by all of the
users who do not have Source Control permits. These rates for 2004-05 are
significantly lower than the "requirement-based rates" calculated to this point
because $185 million of the actual budgeted needs will be funded from
"reserves" and another $28 million will be received as property taxes.
For the past few years these reduced de facto rates were presented to the Board
for adoption as Permit User rates. The issue with using these rates comes from
the Ordinance that provides for Permit User rates. Ordinance No. OCSD-01
requires that the annual cost of service calculated from the actual Permit User
discharge and the adopted Permit User rates must be reduced by the property
tax paid by that user. Those taxes have already been considered during the
calculation of the reduced rates that are equivalent to the flat rate sanitary sewer
service user fee. Correcting this calculation was the original intent of staff in July.
The proposed model does not reduce the Permit User rates for property taxes as
that reduction is made for each individual Permit User based upon that Users
specific property tax allocation to the Sanitation District.
The resultant rates for 2004-05 are higher than the rates that were presented to
the Board and adopted in April as shown in the following table.
Percent
Description Adopted Proposed Change
Flow per m $ 368.58 $ 577.30 57%
BOD per 1000 lb $ 248.55 $ 270.68 9%
SS per 1000 lb $ 238.45 $ 414.27 74%
Avg Permit User @ $18,784.67 $25,395.71 35%
13 mg, 40 k#, 16 k#
Alternatives
Providing the Directors agree with this proposed method of calculation and wish
to recommend that these rates be adopted, it will then be necessary to determine
an effective date. The options include:
• January 1, 2005, as that will be subsequent to the public hearing and the
action and will provide Permit Users some opportunity to adjust their
processes,
Calculation of Permit User Rates
Page 6of6
October 13, 2004
• July 1, 2005, which would finish 2004-05 with the rates that have been
previously adopted and use the proposed methodology beginning in fiscal
year 2005-06.
A January 1, 2005, effective date clearly meets the requirements of public notice,
public hearing and the referendum period. Having two rates for a year is
problematic for staff, but could be accommodated in the reconciliation process.
Invoices during the year are based upon estimated quantities and are reconciled
to actual at year end. The rate adjustment could be included in that process.
Holding this methodology in abeyance until the next rate adoption cycle is the
simplest administrative option. The Board will need to adopt rates for 2005-06 in
April or May 2005, and will have to conduct a Proposition 218 notification of all
users. This notification will include Permit Users, but they could also receive a
special notice. The rates that have been adopted are lower in each category
than the proposed rates, so no Permit User is being overcharged. The problem
of double credit for Permit User property taxes would remain for another year.
Permit User property taxes are estimated to total $908,000. One individual
Permit User accounts for$559,000 of that amount and no additional Permit User
fees are collected from that user. This means the approximate total Permit User
fees that would potentially be improperly offset by property taxes is $349,000.
GGS
H:\dept\fin\210\CRANE\FAHR\FAHR2004\OCTOBERAttachment_1_Staff Report Permit Users 10-2004.doc
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 1 of 13
Based Upon 2002-03 Actual Discharge Quantities
Est[mated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Cost to Total Total Total
Share of Fee Fee Correct Percentage
City Permit User Name Property 2004-05 2004-05 Calculation Increase Flow BOD SS
Tax Adcpted Prcpased Method (MG) (Ibs) (lbs)
ANAHEIM ALSTYLE APPAREL-ACTIVEWEAR MFG.CO. INC. 3,876 635,674 833,276 197,602 31.1% 360.6538 1.541,360 501,739
ANAHEIM M C P FOODS INC. 261 403,506 449,574 46,008 11.4% 16.4867 1.554,067 46,840
ANAHEIM NOR-CAL BEVERAGE CO.INC.(MAIN) 1,898 249,169 297,107 47,948 19.2% 38.9144 827,333 122,382
ANAHEIM NOR-CAL BEVERAGE CO.INC. (TETRA) - 161,038 173,844 22,607 16.1% 23.3847 640,446 33,9W
ANAHEIM DISNEYLAND RESORT-DCA 810 131,125 180,003 58,879 44.9% 94.7449 197,643 197,643
ANAHEIM EXPO DYEING AND FINISHING INC. 856 87,239 118,884 31,645 38.3% 105.4495 161,547 $4,471
ANAHEIM SUNDOR BRANDS INC A PROCTER a GAMBLE CO 6,122 107,719 127,408 19,688 18.3% 27.1223 360,115 34,457
ANAHEIM STEPAN COMPANY 2,670 65,217 61,518 6,302 11.4% 7.3083 210.697 647
ANAHEIM STEINER CORP DBAAMERICAN LINEN SUPPLY - 50,947 65,360 14,413 28.3% 21.5522 136.249 39,368
ANAHEIM PRECISION ANODIZING AND PLATING INC. 308 61,016 86,176 35,159 68.9% 34.7895 1,635 168,469
ANAHEIM ANAHEIM MEMORIAL MEDICAL CENTER - 48,207 66,956 20,749 44.9% 33.3875 69,613 69,613
ANAHEIM DYNAMIC DETAILS INC. 28 31,035 46,363 15,329 49.4% 46.6497 28,668 28,316
ANAHEIM SIOUX HONEY ASSOCIATION C40P 890 36,094 39,666 3,771 10.4% 2.1595 140,914 1,149
ANAHEIM DON MIGUEL MEXICAN FOODS INC. 303 33,221 44,201 10,990 33-1% 14.4226 7%233 35,480
ANAHEIM K CA ELECTRONICS INC. 3,217 19,393 29,560 10,167 62.4% 39.2034 10,306 9,9m
ANAHEIM WEST ANAHEIM MEDICAL CENTER 1,9es 23,231 33,663 10,431 44.9% 16.7858 34,998 34,998
ANAHEIM HARRYS DYE&WASH INC 182 17,502 26,027 7,525 43.0% 21.0879 25,138 14,600
ANAHEIM TAC WEST,INC. - 18,710 24,247 5,537 29.6% 11.6491 46,692 11,769
ANAHEIM CITY OF ANAHEIM-WATER SERVICES - 19,350 33,219 13,669 71.7% 8.0756 95 71,658
ANAHEIM U.W.M.C.HOSPITAL CORPORATION 3,883 14,719 21,328 6,e09 44.9% 10.6362 22,174 22,174
ANAHEIM 13RIOGFORD FOODS CORPORATION 768 14,865 20,758 6,693 39.6% 9.1297 27,877 19,171
ANAHEIM WEYERHAEUSER COMPANY 7,751 13,728 19,076 5,346 38.9% 9.1103 26,073 16,304
ANAHEIM IDEAL ANODIZING INC. 264 13,385 22,580 9,195 66.7% 0.8475 718 41,707
ANAHEIM MULTI-FINELINE ELECTRONIX INC. 847 9,8m 14,575 4,709 47.7% 16.1614 9,990 7,628
ANAHEIM S&S POLISHING/PLATING 11 9,888 10,175 6,286 63.6% 13.7040 673 19,377
ANAHEIM ANAHEIM GENERAL HOSPITAL 1,997 10,993 16,930 4,936 44.9% 7.9434 16,662 16,562
ANAHEIM DANONE WATERS OF N.A.-ANAHEIM e58 6,983 10,843 3,659 55.3% 17.9175 995 554
ANAHEIM DRS TECHNOLOGIES INC 1,093 7,022 10,645 3,623 51.6% 13.0501 4,543 4,643
ANAHEIM ARTISTIC PLATING&METAL FINISHING INC. 260 0,616 9,965 3,350 50.6% 11.4455 5,004 4,835
ANAHEIM DELPHI AUTOMOTIVE SYSTEMS 2,234 5,936 8,974 3,038 51.2% 9.91M 4,390 4,871
ANAHEIM INTEC PRODUCTS INC. 219 8,543 14,511 5,268 69.9% 3.9456 509 29,197
ANAHEIM HAWK INDUSTRIAL UNIFORM 114 6,563 9,404 2,841 43.3% 5.9494 10,089 7,830
ANAHEIM MICROMETALS INC.#2 792 4,446 6,373 1,927 43.3% 5.2761 6,325 3,899
ANAHEIM UNIVERSAL ALLOY CORP. 855 4,113 6,929 1,816 44.1% 6.6353 5,350 2,964
ANAHEIM CEROMET INC. 311 4,966 6,078 1,111 22.4% 2.0917 15,012 1,848
ANAHEIM AMERICAN CIRCUIT TECHNOLOGY INC. 322 3,690 6,423 11834 51.1% 6.6465 2,445 2,232
ANAHEIM PRIVATE LABEL LABORATORIES 413 4,848 6,498 651 13.4% 0.2325 18,055 1,161
H:\deptlHn\210lSTREED\Exoel\Permit Users\2002-03 recon and rates Oct 2004.xis
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 2 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Cost to Total Total Total
City Permit User Name Share or Fee Fee Correct Percentage Flow Boo SS
Property 200405 2004-05 Calculation Increase (MG) (Ibs) ([be)
Tax Adapted Proposed Method
ANAHEIM COPPER CLAD MULTILAYER PRODUCTS INC 3,237 6,045 1,808 55.8% 6.0918 1,603 4,034
ANAHEIM LINCO INDUSTRIES INC. 64 3,961 6,681 2,620 68.1% 3.2995 677 10,910
ANAHEIM MAGNETIC METALS CORP 944 4,046 6,594 1,647 38.2% 1.6681 8,253 5,761
ANAHEIM Y K K(U.S.A)INC. 2,284 2,903 4,338 1,435 40.4% 5.6158 2,184 1,218
ANAHEIM J&H DEBURRING INC.#2 25 3,821 6,776 1,955 51.2% 1.3247 4,837 8,9m
ANAHEIM BLACK OXIDE INDUSTRIES INC. 55 2,296 3,603 1,308 57.0% 4.5814 597 1,924
ANAHEIM A P W ENCLOSURE SYSTEMS,LLC 468 2,639 3,781 1,122 42.5% 2.7002 4,060 2,663
ANAHEIM CLASSIC PLATING INC. - 2,024 3,1(12 1,078 53.2% 3.9877 1,014 1,288
ANAHEIM ANAHEIM PLATING&POLISHING INC. Be 2,067 3,101 1,034 50.0% 3.5712 1,605 1,320
ANAHEIM BOEING COMPANY-BLDG.271 1,606 2,674 3,740 1,165 45.3% 2.1347 3,712 3,627
ANAHEIM GENERAL CERAMICS LLC 2,268 3,690 1,422 62.7% 2.7963 456 4,712
ANAHEIM SMT DYNAMICS - 2,333 3,390 1,057 46.3% 1.8364 3,402 3,402
ANAHEIM CALIFORNIA CUSTOM SHAPES,INC. 168 2,192 2,792 600 27.4% 1.5832 5,692 816
ANAHEIM CREST COATING INC. 272 2,160 2,753 603 28.0% 1.3333 5,574 1,145
ANAHEIM MILBANK WEST INC. 250 1,9w 2,811 842 42.8% 1.8581 3,053 2,200
ANAHEIM ESSEX ELECTRIC INC 915 1,968 2,735 777 39.7% 1.7635 3,452 1,889
ANAHEIM GUNTHER ATHLETIC SERVICE 22 1,698 2,609 813 47.9% 2.5562 1,716 1,373
ANAHEIM MURRIETTA CIRCUITS INC. 88 1,654 2,461 807 48.8% 2.1751 1,706 1,796
ANAHEIM ECONOLITE CONTROL PRODUCTS INC. 353 1,707 2,462 756 44.2% 1.4443 2,669 2,259
ANAHEIM CYTECH ENGINEERIED MATERIALS - 1,590 2,30e 716 45.0% 1.1788 2,372 2,373
ANAHEIM STAINLESS MICRO-POLISH INC. 93 1,156 1,711 me 48.1% 2.3054 833 309
ANAHEIM ADVANCE TECH PLATING INC.#2 126 1,176 1,835 660 56.2% 1.7249 604 1,631
ANAHEIM NEVILLE CHEMICAL COMPANY 0 1,056 1,598 542 61.3% 1.9686 700 657
ANAHEIM UOP LLC - 999 1,516 617 61.7% 1.0723 635 635
ANAHEIM KINSBURSKY BROTHERS SUPPLY INC. 71 1,113 1,649 536 48.1% 1.4611 1,197 1,162
ANAHEIM SUPERIOR PLATING - 885 1,361 478 63.6% 1.9708 325 325
ANAHEIM TAORMINA INDUSTRIES INC.#4 524 1,179 1,642 464 39.3% 0.9676 2,138 1,210
ANAHEIM PRECISION PAINTING 284 1,478 2,422 944 63.8% 0.3766 760 4,826
ANAHEIM AMERIMAX BUILDING PRODUCTS INC. 268 990 1,588 BOB 60.4% 1.4767 244 1,616
ANAHEIM ALLIED PACIFIC METAL STAMPING 478 1,132 1,409 278 24.6% 0.5544 3,239 613
ANAHEIM LEACH INTERNATIONAL 158 790 1,224 434 64.9% 1.6300 285 496
ANAHEIM NU-TEC POWDER COATING 196 993 1,395 401 40.4% 0.6009 1,820 1,340
ANAHEIM I P C CAL FLEX INC. 123 848 1,141 283 34.5% 0.8600 1,729 428
ANAHEIM JELLCO CONTAINER INC. 576 949 1,418 469 49.4% 0.6923 1,1e0 1,701
ANAHEIM ANAHEIM TRUCK DEPOT#2 BIN WASH 524 853 1,238 383 44.9% 0.6163 1,285 1,285
ANAHEIM SECHRIST INDUSTRIES,INC. - 822 1,214 382 47.7% 0.6401 1,117 1,447
ANAHEIM ELECTRORACK PRODUCTS CO.INC. 471 744 1,083 320 43.0% 0.5819 1,201 999
H:\deptTn1210\STREEDT-xoCPermit Users\2002-03 recon and rates Oct 2004.)ds
e 11
Q)
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 3 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSO 60% Permit User Permit User Coat to Total Total Total
City Permit User Name Share of Fee Fee Correct Percentage Flow BOD SS
Property 2004-05 2004-05 Calculation Increase (MG) pbs) (lbs)
Tax Adopted Proposed Method
ANAHEIM R T I ELECTRONICS,INC- 8 692 1,006 313 45.2% 0.6217 1,024 1,029
ANAHEIM TAYLOR-DUNN MANUFACTURING COMPANY 1,464 1,642 2,377 736 44.8% 1.2090 2,480 2,432
ANAHEIM MILLENNIUM CIRCUITS SERVICES CORP - 651 716 165 29.9% 0.5169 1,299 161
ANAHEIM PICOFARAD INC. 62 654 825 271 49.0% 0.5654 629 792
ANAHEIM RTR INDUSTRIES 46 550 797 247 44.9% 0.3975 829 829
ANAHEIM RIGIFLEX TECHNOLOGY INC. 87 419 ew 187 44.5% 0.6432 508 234
ANAHEIM LINVATEC CORPORATION 38 454 668 204 44.9% 0.3281 684 684
ANAHEIM PACIFIC UTILITY PRODUCTS INC. 169 360 550 190 52.8% 0.5937 235 347
ANAHEIM IKON POWDER COATING - 396 548 152 38.5% 0.3639 722 344
ANAHEIM BRIDGEMARK CORP-DOWLING#2 - 264 413 149 56.0% 0.7155 - -
ANAHEIM AQUARIAN COATINGS CORP 21 369 564 175 44.9% 0.2813 587 687
ANAHEIM AR0SERVICE 243 345 604 159 46.1% 0.2962 474 493
ANAHEIM PRECON,INC. 34 334 470 137 41.0% 0.2709 573 384
ANAHEIM A&R POWDER COATING INC. - 253 381 127 50.3% 0.4615 187 164
ANAHEIM ANAHEIM EXTRUSION CO.INC. 569 651 948 297 45.7% 0.4688 943 993
ANAHEIM UNITED CUSTOM POLISHING&PLATING 49 243 364 122 50.0% 0.4086 197 181
ANAHEIM ADVANCE TECH PLATING INC. - 218 340 121 56.6% 0.4279 78 173
ANAHEIM POWDERCOAT SERVICES INC.#1 25 238 351 113 47.7% 0.3058 264 249
ANAHEIM PACIFIC IMAGE TECHNOLOGY,INC. 197 301 104 52.7% 0.4080 97 94
ANAHEIM S M T DYNAMICS LLC 180 269 88 49.0% 0.2562 17e 176
ANAHEIM ELECTRO METAL FINISHING CORPORATION 91 188 271 83 43.9% 0.1443 292 283
ANAHEIM EXQUISITE DESIGNS INC. 121 188 67 54.9% 0.2938 27 27
ANAHEIM POWDERCOAT SERVICES INC.#4 138 203 87 49.4% 0.2008 127 127
ANAHEIM POWDERCOAT SERVICES INC.#2 25 162 235 73 44.9% 0.1170 244 244
ANAHEIM ACROSURR INC.#2 65 121 183 61 60.6% 0.1728 106 131
ANAHEIM POWDERCOAT SERVICES INC.#3 128 184 58 46.2% 0.1214 168 168
ANAHEIM M T S MICROELECTRONICS INC. - 129 187 58 44.9% 0.0937 194 193
ANAHEIM OLIVE OIL CO. 65 Be 127 41 47.2% 0.1207 95 76
ANAHEIM DETAILS INC N.DBA DYNAMIC DETAILS INC. 100 120 174 54 44.9% 0.0887 181 181
ANAHEIM TECHPLATE ENGINEERING CO.INC. - 80 118 38 47.0% 0.0813 108 128
ANAHEIM TRANSLINE TECHNOLOGY INC. 213 221 335 114 51.6% 0.3958 160 158
ANAHEIM REMEDY ENVIRONMENTAL SERVICES - 31 45 14 44.9% 0.0225 47 47
ANAHEIM CUSTOM POWDER COATINGS 26 38 12 44.9% 0.0189 39 39
ANAHEIM VEECO ELECTRO FAB INC.#2 89 88 134 45 60.3% 0.180 41 41
ANAHEIM ALL METAL PAINT STRIPPING INC.#2 598 89 126 0.0% 0.0437 164 144
ANAHEIM A P W ENCLOSURE SYSTEMS LLC SOUTH 4,473 1,636 2,481 0.0% 2.6000 1,227 1,578
ANAHEIM H.KOCH&SONS COMPANY 492 223 333 0.0% 0.3262 212 212
H:ldeptltin1210lSTREED1E=I\Permft Users12002-03 reoon and rates Oct 2004.rds
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 4 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSO 60% Permit User Permit User Cost to Total Total Total
City Permit User Name Share of Fee Fee Correct Percentage Flow Boo SS
Property 2004-05 2004-06 Celculaticn Increase (MG) (Ibs) (lbs)
Tax Adopted Proposed Method
ANAHEIM DISNEYLAND RESORT 559,204 468,867 705,635 140,431 26.2% 354.5820 731,346 731,346
BREA HEALTH CARE APPAREL SERVICES 442 14.480 20,406 5,925 40.9% 16.6040 23,419 12,349
BREA GERARD TILE e90 15,291 26.817 10,525 68.8% 4.7316 2,801 53,895
BREA COOPER AND BRAIN INC. 4 8,839 12,814 3,976 45.0% 15.4992 9,708 2,990
BREA WINONICS(BREA) 603 8,152 12,306 4,155 61.0% 16.1971 5,180 3,750
BREA HARTE-HANKS SHOPPERS 11330 8,902 11,768 2,865 32.2% 4.6353 21,063 7.905
BREA IQRKHILL RUBBER CO(SOUTH) 828 7,795 11,484 3,689 47.3% 8.0498 9,630 10.212
BREA ELECTRONIC PRECISION SPECIALTIES INC. 121 3,784 5,980 2,177 57.5% 8.4544 499 2,280
BREA BREA COMMUNITY HOSPITAL 3,176 4,850 7.027 2,178 44.9% 3.6041 7.308 7,306
BREA CRC RIM INC 1.690 3,597 6,384 1,788 49.7% 6.2437 3,313 3,525
BREA BRISTOL INDUSTRIES 684 2,830 4,255 1,425 50.4% 4.3756 2,394 2,609
BREA FINELINE CIRCUITS&TECHNOLOGY INC. 118 1,121 1,466 335 29.9% 1.0779 2,628 296
BREA SCISOREK&SON FLAVORS,INC. 375 1,184 1,502 318 26.9% 0.8409 3,114 418
BREA HARBOR TRUCK BODIES INC. 378 641 927 288 44.7% 0.4984 961 918
BREA MORAVEK BIOCHEMICALS INC. 3 371 581 190 61.2% 0.6624 281 261
BREA CENTRAL POWDER COATING - 274 368 94 34.2% 0.2652 670 147
BREA ENGRAVERS INK CO 85 116 184 69 69.9% 0.1137 54 250
BREA KIRKHILL RUBBER CO(SOUTH) 1,028 - - 0.0% - -
BREA AERA ENERGY LLC#2 246 114 165 - 0.0% 0.0821 171 171
BUENA PARK DEAN FOODS CO.OF CALIF.INC(MILK PLANT) 1,418 169,434 216,490 47,056 27.8% 38.2970 488,307 163,225
BUENA PARK SABA TEXTILES INC. 11009 124,465 173,710 49,253 39.6% 129.0030 213,403 100,129
BUENA PARK SEVEN-UP BOTTLING COMPANY 766 120,741 142,264 21,523 17.8% 34.6324 405,378 30,279
BUENA PARK AMERIPEC INC. 584 96,278 112,239 15,081 16.0% 22.1770 332,831 22,560
BUENA PARK DEAN FOODS 00.OF CALIF.INC.(ICE CREAM) 615 67,620 87,680 20,053 29.7% 10.1365 181,045 79,231
BUENA PARK PEPSI-COLA BOTTLING GROUP 3,837 60,274 72,966 12,692 21.1% 18,6449 189,788 26,282
BUENA PARK K U A TEXTILES INC. 650 35,269 51,327 16,068 45.6% 28.8471 60,339 50,806
BUENA PARK SUNCLIPSE,INC.DBA CORRU KRAFT II 2.347 37,727 53.385 15,658 41.5% 10.7168 71,270 67,362
BUENA PARK CLEUGH'S RHUBARB COMPANY 216 29,344 36.456 7,112 24.2% 10.3142 66,100 17,371
BUENA PARK ULTRA WHEEL COMPANY 1,212 11,060 le,425 5,366 48.5% 15.9033 11,086 10,244
BUENA PARK PRIMATEX INDUSTRIES OF CA INC 335 9,817 16,235 5,418 65.2% 12.e3S0 6,273 14,766
BUENA PARK GEORGIA PACIFIC CORPORATION 3,808 7,119 8,781 1,682 23.3% 2.5314 21,288 3,772
BUENA PARK CROCKETT CONTAINER CORP. 676 4,444 6,169 724 16.3% 0.8970 16,491 1,106
BUENA PARK MEAD PACKAGING 1,906 3,240 4,400 1,160 35.8% 1.9064 6,879 3,471
BUENA PARK TRIM-LOKI R.T.P. 969 2,095 3,174 1,079 51.5% 3.6647 1.376 1,370
BUENA PARK HANSON-LORAN CO.,INC. 276 2,112 2,649 537 26.4% 1.1609 6,872 811
BUENA PARK ALLOY DIE CASTING CO. 456 1,648 2,395 748 45.4% 1.7335 2,222 1,915
BUENA PARK WEYERHAEUSER COMPANY#2 - 736 1,065 330 44.9% 0.5313 1,108 1,108
H:\dept\t1n\21MSTREED\Excel\Permit Usera\2002-03 recon and rates Oct 2004.)ds
a .,
f)
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 5 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Cost to Total Total Total
City Permit User Name Share of Fee Fee Correct Percentage Rory BOD SS
Property 2004-05 2004-06 Calaladon Increase (MO) (Iba) (lbs)
Tax Adapted Proposed Method
BUENA PARK GENERAL CONTAINER CORPORATION 349 529 761 232 43.9% 0.4284 813 709
BUENA PARK GARDNER LITHOGRAPH,INC. 327 484 704 221 45.8% 0.4076 685 685
BUENA PARK DERM COSMETICS LAB'S INC. 169 339 413 75 22.0% 0.1070 1,047 166
COSTA MESA WEST NEWPORT OIL COMPANY 0 63,944 60,173 16,229 25.4% 43.9588 174,em 18,133
COSTA MESA FAIRVIEW STATE HOSPITAL - 69,893 94,028 24,13e 34.5% 32.5890 157,171 78,448
COSTA MESA LOS ANGELES TIMES COMMUNICATIONS LLC 8,296 20,670 25,617 4,841 23.4% 10.5488 60,439 7,405
COSTA MESA I C N PHARMACEUTICALS INC. 2,685 9,482 14,430 4,948 52.2% 18.6636 6,421 6,421
COSTA MESA VELIE CIRCUITS INC. 88 4,628 e,849 2,221 48.0% 8.5218 4,055 2,008
COSTA MESA SANMINA CORPORATION(AIRWAY) 1,671 3,785 6,829 2,046 64.0% 7.6862 1,623 2,300
COSTA MESA MESA CONSOLIDATED WATER DISTRICT - 3,464 6,440 1,97e 57.0% 4.6293 1,776 5,621
COSTA MESA SANMINA CORPORATION(REDHILL) 1,081 2,536 3,664 1,328 52.4% 6.4701 1,218 908
COSTA MESA EATON CORPORATION 192 3,093 4,503 1,710 65.3% 2.4084 2,585 e,437
COSTA MESA TOYOTA RACING DEVELOPMENT 242 2,906 4,210 1,304 44.9% 2.2(152 4,319 4,186
COSTA MESA PRIME TECHNOLOGIES,INC. 245 2,200 2,863 663 30.1% 2.0057 5,1e8 738
COSTA MESA SEMICOA SEMICONDUCTORS 137 1,312 1,ew e50 49.8% 1.9849 1,191 1,191
COSTA MESA CRITERION MACHINE WORKS 140 367 642 176 47.7% 0.32e5 485 651
COSTA MESA RAILMAKERS,INC. 51 135 196 61 44.9% 0.0975 203 203
COSTA MESA IRVINE SENSORS CORP. e99 248 362 - 0.0% 0.2916 314 263
COSTA MESA AVIATION EQUIPMENT STRUCTURES,INC. 535 380 551 1e 3.0% 0.2834 665 566
CYPRESS BOIENG COMPANY(CYPRESS) 888 1,798 2,eW 608 44.9% 1.2994 2,709 2,709
CYPRESS TAYCO ENGINEERING,INC. - 983 1,3w 404 41.1% 0.e582 1,732 1,298
CYPRESS HYATT DIE CASTING 8 ENGINEERING CORP. 630 744 1,we 334 44.9% 0.6373 1,120 1,120
FOUNTAIN VALLEY PRO-TECH e,257 12,094 3,837 4e.5% 16.2290 8,011 2,73e
FOUNTAIN VALLEY PAYTON TECHNOLOGY CORP 7,609 11,508 3,897 51.2% 13.6517 6,292 5,292
FOUNTAIN VALLEY KODAK PROCESSING LABS 143 7,114 9,981 2,867 40.3% 9.9591 10,862 3,118
FOUNTAIN VALLEY OMNI METAL FINISHING,INC. 130 4,630 7,282 2,653 57.3% 10,0612 784 3,046
FOUNTAIN VALLEY CUSTOM ENAMELERS INC. 143 812 1,210 398 49.0% 1.1772 784 768
FOUNTAIN VALLEY SANMINA CORPORATION 116 782 1,077 296 37.7% 1.1513 1,301 146
FOUNTAIN VALLEY UNITED CIRCUIT TECHNOLOGY INC. 57 682 e48 288 45.7% 0.8111 698 463
FOUNTAIN VALLEY KENLEN SPECIALITIES INC. 12e 329 491 1e2 49.3% 0.5e38 278 219
FOUNTAIN VALLEY A 8 0 ELECTROPOLISH 167 278 432 154 65.2% 0.5794 94 174
FULLERTON KIMBERLY-CLARK WORLDWIDE,INC. 19,607 317,216 490,163 172,947 64.5% 451.6799 201,519 422,093
FULLERTON FULLERTON CULTURED SPECIALTIES 969 168,368 207,019 38,6w 23.0% 31.4280 518,277 117.289
FULLERTON DAE SHIN USA,INC. 1,180 126,454 179,191 52,707 41.7% 132.8300 199,711 118,954
FULLERTON VAN LAW FOOD PRODUCTS,INC. 564 156,874 199.584 43,711 28.0% 4.6960 440.157 187,636
FULLERTON Y2K TEXTILE CO.,INC. 1,996 110,382 148,734 38,373 34.8% 119.7883 219,995 48,368
FULLERTON CALIF STATE UNIV®FULLERTON - 71,197 104,305 33,108 46.5% 98.2000 81,699 61,424
H:ldept%ft210lSTREED1ExcellPermlt UserM2002-03 recon and rates Oct 2004.)ds
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 6 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Cost to Total Total Total
City Permit User Name Sh 20Fee Fee Correct Percentage Flow 800 SS
04-05 2004-06 Calculation Increase (MG) pbs) (lbs)
Tax Adopted Proposed Method
FULLERTON FAIRCHILD FASTENERS 833 22,109 32,915 10,805 48.9% 26.2354 23,849 27,310
FULLERTON WORLD CITRUS WEST 1,811 28,396 32,164 6,769 21.9% 8.3974 82,474 14,836
FULLERTON ST.JUDE MEDICAL CENTER - 17,680 25,619 7,039 44.9% 12.7750 26,636 26,636
FULLERTON ORANGE COUNTY METAL PROCESSING 50 13,424 22,024 8,800 64.1% 10,6508 386 25,641
FULLERTON BECKMAN COULTER,INC. 6,432 13,351 19,714 8,384 47.7% 14.4015 15,988 17,088
FULLERTON P C A METAL FINISHING,INC. 99 8,109 12,465 4,355 63.7% 18.3000 3,700 4,956
FULLERTON WINONICS,INC. 59 6,725 10,610 3,785 56.3% 16.2635 919 2,108
FULLERTON WESTERN YARN DYING 248 5,778 7,810 2,032 35.2% 8.7538 11,189 2,130
FULLERTON NELCO PRODUCTS,INC. 283 6,617 8,373 2,756 49.1% 8.0274 6,469 5,469
FULLERTON JOHNSON CONTROLS BATTERY INC. 2,174 5,054 7,901 2,80 56.3% 9.0172 1,935 5,241
FULLERTON CARGILL INC. 1,107 5,426 7,785 2,359 43.5% 6.2534 7,742 5,020
FULLERTON SUNCLIPSE,INC.(CORRUGATOR PLANT) 1,032 6,874 9,611 2,737 39.8% 1.6184 13,838 11,906
FULLERTON WEIDMANN WATER CONDITIONERS,INC. 20 3,941 6,313 2,372 60.2% 7.9213 213 4,060
FULLERTON MONOGRAM SYSTEMS 1,979 4,026 6,312 2,288 56.8% 3.4190 2,881 8,691
FULLERTON B 1 TECHNOLOGIES,INC. 1,654 2,079 3,058 977 47.0% 2.2038 2,590 2,614
FULLERTON KRYLER CORPORATION - 1,300 2,016 716 55.1% 3.1252 260 250
FULLERTON SUNCLIPSE INC. 1,032 1,853 2,593 740 39.9% 1.1293 3,443 2,436
FULLERTON SCIENTIFIC SPRAY FINISHES,INC. 25 1,228 1,789 571 46.5% 1.6540 1,426 1,105
FULLERTON CARAN PRECISION ENGINEERING 556 955 1,384 429 44.9% 0.6903 1,439 1,439
FULLERTON SANTANA SERVICES 15 389 642 253 65.0% 0.4538 34 896
FULLERTON OR SMOOTHIE ENTERPRISES 58 83 26 44.9% 0.0416 87 87
FULLERTON FULLERTON PLATING 398 142 215 - 0.0% 0.2750 85 81
GARDEN GROVE HOUSE FOODS AMERICA CORPORATION - 369,484 472,744 103,260 27.9% 76.7310 1,019,871 367,848
GARDEN GROVE U.S.DYEING&FINISHING INC. 660 209,560 289,649 80,089 38.2% 208.0300 380,501 160,667
GARDEN GROVE PILKINGTON AEROSPACE 2,361 18,543 30,066 11,523 62.1% 19.1630 6,843 42,052
GARDEN GROVE LINFINITY MICROELECTRONICS INC. 3,241 11,721 18,485 8,744 57.6% 27.3190 1,096 5,787
GARDEN GROVE IDEAL UNIFORM RENTAL SERVICE - 12,402 18,740 6,337 61.1% 7.7478 14,390 25,036
GARDEN GROVE GOODWIN COMPANY 142 7,976 9,328 1,352 17.0% 1.7556 27,415 2,167
GARDEN GROVE CATALINA CYLINDERSA DIV.OFAPP 638 5,092 7,505 2,413 47.4% 6.7488 6,689 4,995
GARDEN GROVE AIR INDUSTRIES CORP.-KNOTT 1,856 6,441 7,884 2,443 44.9% 3.9312 0,197 8,197
GARDEN GROVE COASTLINE METAL FINISHING CORP. 230 3,070 4,741 1,671 54.4% 5.9377 1,357 2,283
GARDEN GROVE ELECTRON PLATING III INC. 131 2,247 3,504 1,258 56.0% 5.1320 489 1,001
GARDEN GROVE BAZZ HOUSTON CO. 343 2,216 3,185 969 43.7% 3.0658 2,926 1,504
GARDEN GROVE CANNON EQUIPMENT WEST INC. 437 1,406 2,048 642 45.6% 1.2770 1,953 1,687
GARDEN GROVE LACEY CUSTOM LINENS 40 1,508 2,351 843 65.0% 1.1490 1,218 3,279
GARDEN GROVE AIR INDUSTRIES CORP.(CHAPMAN) 508 804 1,139 336 41.7% 0.6378 1,388 1,095
GARDEN GROVE D&S CUSTOM PLATING INC. 42 642 819 277 51.2% 0.8982 407 459
H:\deptltin1210lSTREED1ExcellPermit Usera12002-03 recon and rates Oct 2004-As
s
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 7 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Coat to Total Total Total
CRY Permit User Name Share of Fee Fee Correct Percentage Flay BOD SS
Property 2004-05 2004-06 Calculation Increase (MG) pba) (Ifss)
Tax Adopted Proposed Method
GARDEN GROVE CD VIDEO INC - 4e0 e87 226 49.2% 0.6073 440 440
GARDEN GROVE BASIC ELECTRONICS,INC. 201 $61 479 118 32.7% 0.2176 833 308
GARDEN GROVE STAR POWDER COATING 9 45 69 14 31.4% 0.0306 106 30
GARDEN GROVE MIRACLE STRIPPING&PLATING,INC - 30 44 14 44.9% 0.0220 46 46
GARDEN GROVE GRAPHIC PACKAGING CORP. 2,043 1,326 1,921 0.0% 0.9599 1,995 1,885
HUNTINGTON BEACH BOEING COMPANY(GENERAL FAQ 5,970 89,944 137,487 47,544 52.9% 56.9220 84,640 192,113
HUNTINGTON BEACH JOHN A.THOMAS - 23,422 28,514 5,092 21.7% 11.6342 71,026 6,210
HUNTINGTON BEACH COLUMBIA HUNTINGTON BEACH HOSPITAL 908 14,631 21,200 6,570 44.9% 10.5715 22,042 22,042
HUNTINGTON BEACH NUEVO ENERGY CO(HB) 193 12,741 19,029 6,288 49.4% 11.4379 14,800 20,324
HUNTINGTON BEACH CAL-AURUM INDUSTRIES INC. 226 5,183 8,082 2,899 65.9% 13.0295 628 944
HUNTINGTON BEACH BRINDLEITHOMAS OIL COMPANY 59 5,767 6,765 908 17.3% 2.1800 19,342 639
HUNTINGTON BEACH CAMBRO MANUFACTURING 934 4,W8 7,169 2,222 44.9% 3.6750 7,454 7,454
HUNTINGTON BEACH PRECISION RESOURCE,CALIF DIV 626 3,832 5,469 1,e37 42.7% 3.8088 6,881 4,051
HUNTINGTON BEACH SPEEDY CIRCUITS,FACILITY#2 120 3,073 4,375 1,302 42.4% 4.7120 4,137 1,293
HUNTINGTON BEACH GARG-OIL PRODUCTION LLC 139 1,289 2,019 730 56.6% 3.4973 - -
HUNTINGTON BEACH TIODIZE COMPANY,INC. 9e 1,417 2,189 772 54.4% 3.0931 488 655
HUNTINGTON BEACH CITY OF HUNTINGTON BEACH FIRE DEPARTMENT - 1,355 2,026 670 49.5% 2.6012 1,004 709
HUNTINGTON BEACH BOEING COMPANY(GRAHAM) - 1,550 2,246 698 44.9% 1.1200 2,336 2,335
HUNTINGTON BEACH CAPRO OIL COMPANY 22 708 1,106 400 5e.e% 1.9162 - -
HUNTINGTON BEACH SOUTH COAST OIL CORPORATION 182 659 1,033 373 5e.e% 1.7892 -
HUNTINGTON BEACH HB OIL OPERATIONS TRUST 22 847 1,222 376 44.3% 1.0490 1,137 744
HUNTINGTON BEACH SOLDERMASK,INC. 132 626 883 257 41.1% 0.3184 1,140 942
HUNTINGTON BEACH CEMPI INDUSTRIES INC. 176 469 691 222 47.3% 0.5315 500 660
HUNTINGTON BEACH LOCI GRAPHICS,INC. 144 $78 562 165 48.8% 0.7109 306 167
HUNTINGTON BEACH MILLETT INDUSTRIES - 418 607 190 45.4% 0.3409 602 698
HUNTINGTON BEACH M.S.BELLOWS 62 393 493 100 25.5% 0.1465 1,118 257
HUNTINGTON BEACH ROCK INDUSTRIES,INC. 97 301 442 142 47.1% 0.38" 347 308
HUNTINGTON BEACH SPEEDY CIRCUITS,DIV OF PJC - 321 465 144 44.9% 0.2320 484 484
HUNTINGTON BEACH PIER OIL COMPANY 35 206 320 116 56.6% 0.5550 - -
HUNTINGTON BEACH PETROPRIZE 7 106 168 60 56.6% 0.2877
HUNTINGTON BEACH BRINDLEITHOMAS - 54 84 30 56.e% 0.1460
HUNTINGTON BEACH SIGNAL ASSOCIATES 3 25 39 14 56.e% 0.0683
HUNTINGTON BEACH SOUTH COAST OIL COMPANY - - - 0.0%
HUNTINGTON BEACH ALEXANDER OIL COMPANY 3 0.0%
HUNTINGTCN BEACH W.M.ELLIOTT 7 0.0%
HUNTINGTON BEACH WILVIAN JEWELL RENNER 17 1 2 0.0% 0.0029
HUNTINGTON BEACH WILLIAM J.SCOTT 28 0.0%
H:WeptNffn\2101STREEMExceINPermit Usera\2002-03 recon and rates Oct 2004.x1e
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 8 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit Uaer Coat to Tom Total Total
Share of Fee Fee Correct Percentage
City Permit User Name Boo SS
Property 2004-05 2004-05 Calculatfan Increase
Tax Adopted Proposed Method (MMG)G) ��) ��)
HUNTINGTON BEACH ODONNELL OIL COMPANY 85 13 18 - 0.0% 0.0091 19 19
HUNTINGTON BEACH S&C OIL CORPORATION 106 - - - 0.0% - - -
IRVINE ROYALTY CARPET MILLS INC. 165 276,068 347,410 71,341 25.8% 173.3160 752,704 105,273
IRVINE B. BRAUN MEDICAL INC. 15,072 110,353 168,594 58,241 52.8% 237.2520 50,689 43,228
IRVINE MARUCHAN,INC. 8g0 44,619 54,360 9,741 21.8% 14.6254 137,997 20,673
IRVINE TODDS ENTERPRISES 424 45,589 59,249 13,660 30.0% 7.7908 120,786 53,243
IRVINE PACKARD-HUGHES INTERCONNECT SYSTEMS 994 19,591 29,691 10,100 51.8% 39.2168 11,619 9,427
IRVINE EDWARD LIFESCIENCES LLC 2,810 22,194 32,751 10,557 47.6% 28.0708 25,842 25,842
IRVINE UNION INCORPORATED 22,008 28,544 6,538 29.7% 16.6178 54,008 11,849
IRVINE PRUDENTIAL OVERALL SUPPLY 215 9,346 13,186 3,840 41.1% 6.0068 18,583 12,621
IRVINE JEFFERSON SMURFIT CORPORATION(U.S.) 2,349 8,644 11,750 3,108 35.9% 4.9626 18,334 9,469
IRVINE RAYNE DEALERSHIP CORP - 5,519 8,709 3,180 67.8% 12.3764 611 3,376
IRVINE ENTHONE INC. 211 6,923 8,175 1,252 18.1% 2.0340 23,113 1,797
IRVINE ELECTROLURGY INC. 67 4,970 7,664 2,894 68.2% 9.4495 1,084 5,108
IRVINE SUNSET ENVIRONMENTAL,INC.#2 164 5,811 8,646 2,934 52.3% 1.8145 8,756 13,683
IRVINE COSMOTRONIC CORP 26 3,286 4,404 1,118 34.0% 3.1835 6,851 1,718
IRVINE RICOH ELECTRONICS INC. 11e 2,900 4,303 1,404 48.4% 3.9095 3,028 2,961
IRVINE PRINTRONIX,INC. 1,184 2,319 3,389 1,050 45.3% 1.8325 3,376 3,375
IRVINE NEWPORT CORPORATION 1,303 2,347 3,401 1,054 44.9% 1.e987 3,536 31538
IRVINE 0 C B REPROGRAPHICS 106 2,162 3,133 971 44.9% 1.5e25 3,258 3,258
IRVINE FMH INVESTOR GROUP 370 1,279 1,874 595 48.6% 1.4464 1,693 1,487
IRVINE NEWPORT PRECISION OPTICS 827 1,208 381 46.0% 0.6627 1,162 1,233
IRVINE SUNSET ENVIRONMENTAL,INC.#1 246 810 1,173 364 44.9% 0.5850 1,220 1,220
IRVINE ALLTEK CIRCUIT INC. - 427 639 212 49.8% 0.9059 284 94
IRVINE DYE TECHNIQUE INC. 28 187 270 84 44.9% 0.1348 281 281
IRVINE WINTEC,LLC - 117 170 53 45.2% 0.0991 16a 162
LA HABRA RALPHS GROCERY COMPANY(BAKERY) 2,716 29,339 35,627 6,468 22.1% 6.6379 91,387 17,521
LA HABRA SHEPARD BROTHERS INC. 316 5,803 6,519 716 12.3% 0.3155 21,984 932
LA HABRA WATER MAN 9 2,163 3,373 1,210 55.9% 6.8179 190 190
LA HABRA ARNOLD ELECTRONICS,INC.01 22 1,em 2,800 998 55.2% 4.1023 474 733
LA HABRA LA HABRA PLATING CO. INC. 15 815 1,272 467 66.0% 2.1230 Be 68
LA PALMA LA PALMA INTERCOMMUNITY HOSPITAL 1,096 17,035 24,084 7,649 44.9% 12.3087 25,664 25,664
LA PALMA PERFORMANCE MACHINE INC - 1,ew 2,330 722 44.9% 1.1621 2,423 2,423
LOS ALAMITOS JOINT FORCES TRAINING BASE,LOS ALAMITOS - 25,223 37,248 12,025 47.7% 26.8863 30,ee5 33,805
LOS ALAMITOS LOS ALAMITOS GENERAL HOSPITAL 3,871 17,049 24,705 7,050 44.9% 12.3191 25,685 25,685
LOS ALAMITOS TREND OFFSET PRINTING SERVICES INC. 11,934 17,293 5,359 44.9% 8.6231 17,979 17,979
LOSALAMITOS ARROWHEAD PRODUCTS CORPORATION 2,e82 8,416 12,420 4,004 47.0% 10.2132 0,689 9,430
H:adeptlfEn12101STREED1ExoellPermlt Users12002-03 recon and rate3 Oct 2000ds
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 9 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Cost to Total Total Total
City Permit User Name Share of Fee Fee Correct Percentage Flay 800 SS
Property 2004-05 2004-05 Calculation Increase (MG) (Ibs) (Ibs)
Tax Adapted Proposed Method
LOSALAMITOS BEARING INSPECTION INC. 940 1,164 1,e85 521 44.7% 0.8458 1,764 1,73e
NEWPORT BEACH JAZZ SEMICONDUCTOR 43,092 100,207 157,093 56,187 65.7% 257.5577 12,271 12,271
NEWPORT BEACH HOAG MEMORIAL HOSPITAL PRESBYTERIAN - 49,800 72,162 22,362 44.9% 35.9836 76,02e 75,020
NEWPORT BEACH HIXSON METAL FINISHING 41 6,888 10,447 3,779 50.7% 15.7516 894 2,684
NEWPORT BEACH RENAL RESEARCH INSTITUTE,LLC - 3,108 4,503 1,395 44.9% 2.2454 4,682 4,682
NEWPORT BEACH AMETEKAEROSPACE 282 2,400 3,513 1,113 46.4% 2.4275 3,124 3,057
NEWPORT BEACH CITY OF NEWPORT BEACH - 1,843 2,441 798 48.6% 2.2182 1,694 1,694
NEWPORT BEACH BASIN MARINE INC. 18 264 387 123 48.8% 0.3468 308 251
ORANGE UCI MEDICAL CENTER - 87,621 126,821 39,3m 44.9% 63.2390 131,853 131,863
ORANGE ANGELICA TEXTILE 268 60,815 1C0,063 31,240 45.4% 89.9501 a5,774 60,148
ORANGE ST,JOSEPH HOSPITAL 218 73,318 106,240 32,922 44.9% 52,9765 110,456 110,458
ORANGE GRANDE TORTILLA INC. 205 51,805 67,676 15,871 30.6% 3.2805 137,285 e8,11a
ORANGE CHILDREN'S HOSPITAL OF ORANGE COUNTY - 17,530 25,402 7,872 44.9% 12.6e65 26,410 26,410
ORANGE MARCEL ELECTRONICS INT. 162 12,346 18,446 e,100 49.4% 21.8946 10,0e8 7,439
ORANGE WASTE MANAGEMENT OF OC TRANSFER 393 12,212 14,725 2,613 20.e% 3.2326 39,024 6,642
ORANGE CHAPMAN MEDICAL CENTER 1,253 9,889 14,330 4,440 44.9% 7.1454 14,698 14,898
ORANGE CIRTECH INC. 160 6,663 9,870 3,007 45.1% 6.7337 9,197 7,949
ORANGE WEST AMERICAN RUBBER COMPANY INC. 1,183 5'aw 8,643 2,793 47.7% 7.0405 6,686 8,685
ORANGE SIERRA SPRING WATER COMPANY e8 3,844 5,778 1,934 50.3% 7.9708 2,471 1,22e
ORANGE STATEK CORPORATION 290 4,683 6,588 1,906 40.7% 4.6971 7,773 4,278
ORANGE CONTINUOUS COATING CORPORATION 402 2,944 4,560 1,e1e 54.9% 5.9100 1,135 2,030
ORANGE SVG THERMCO SYSTEMS INC. 683 3,737 5,415 1,678 44.9% 2.7000 5,630 5,630
ORANGE PLATECORP#2,INC. 176 2,728 4,118 1,391 51.0% 5.4129 1,725 1,269
ORANGE ULTRA PURE METAL FINISHING,INC. 118 2,669 4,601 1,743 61.0% 4.6517 363 4,108
ORANGE ORANGE COUNTY PLATING CO.,INC. 18 2,322 3,575 1,253 64.0% 4.8133 962 1,294
ORANGE CIRCUIT ACCESS 55 3,058 3,620 561 16.4% 1.0015 10,118 730
ORANGE VILLA PARK ORCHARDS ASSOCIATION 474 3,012 4,532 1,520 60.4% 1.8421 3,634 5,998
ORANGE DUCCMMUN AEROSTRUCTURES 2,083 2,660 3,707 1,046 39.3% 2.9010 4,546 1,935
ORANGE SOUTH COAST WATER 299 1,914 3,113 1,199 62.8% 2.8263 211 3,436
ORANGE FOAMEX L.P. - 2,039 2,969 920 45.1% 1.5114 3,030 3,056
ORANGE CADILLAC PLATING 137 11265 11980 715 56.5% 2.4091 375 1,052
ORANGE HIGHTOWER PLATING&MANUFACTURING CO. 473 1,263 2,015 752 59.6% 2.5353 117 1,255
ORANGE HAMILTON MATERIALS 112 1,647 2,386 740 44.9% 1.1900 2,481 2,481
ORANGE DUNHAM METAL PROCESSING 19 1,445 2,319 673 60.4% 1.6632 544 2,924
ORANGE QUALITY ALUMINUM FORGE It2 77 1,270 1,833 563 44.4% 1.1122 1,879 1,646
ORANGE SERRANO WATER DISTRICT - 1,543 2,627 1,084 70.2% 0.7851 26 5,217
ORANGE THERMAL-VAC TECHNOLOGY - 805 1,312 507 63.0% 1.2225 60 1,424
H:ldeptlffn12101STREED1Excel\Permit UserM2002-03 recon and rates Oct 2004.x1s
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 10 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Cost to Total Total Total
City Permit User Name Sure or Fee Fee Correct Percentage Flow BOD SS
Property 2004-05 2004-05 Calculation Increase (MG) Qbs) (Ibs)
Tax Adopted Proposed Method
ORANGE QUALITY ALUMINUM FORGE 175 599 908 306 51.1% 0.9273 477 682
ORANGE S F P P,L.P. 32 712 884 173 24.3% 0.3604 2,042 298
ORANGE DITTY DRUM COMPANY,INC. 27 623 793 270 51.6% 0.9733 338 338
ORANGE CIRCUIT TECH INC. 115 350 481 131 37.3% 0.3761 645 216
ORANGE INDEPENDENT FORGE 175 379 555 176 46.2% 0.3297 520 639
ORANGE A8A DEBURRING AND TUMBLING - 316 444 128 40.5% 0.2668 548 343
ORANGE PERFORMANCE POWDER,INC. - 266 390 124 46.8% 0.3086 323 299
ORANGE BURLINGTON ENGINEERING INC. 61 239 362 113 47.1% 0.2627 293 293
ORANGE GOMTECH ELECTRONICS 27 a1 123 42 51.2% 0.1456 57 57
ORANGE DATAAIRE INC.#2 923 643 778 - 0.0% 0.4202 858 734
PLACENTIA KNOTT'S BERRY FARM FOODS 2,041 235,398 267,491 32,095 13.6% 16,5656 871,488 63,200
PLACENTIA PLACENTIA LINDA COMMUNITY HOSPITAL 2,856 10,463 26,753 8,290 44.9% 13.3404 27,815 27,815
PLACENTIA FROZSUN FOODS,INC. 163 11,382 14,730 3,348 29.4% 7.4577 28,384 6,610
PLACENTIA S.B.THOMAS INC. 742 6,388 7,880 1,514 23.8% 1.7607 19,044 4,113
PLACENTIA CALIF CONSOLIDATED WATER PURIFICATION 249 4,668 7,637 3,069 67.2% 3.8176 383 12,870
PLACENTIA EXCELLO CIRCUITS MANUFACTURING CORP. 153 3,085 4,510 1,433 46.4% 6.4805 3,083 1,254
PLACENTIA CARTEL ELECTRONICS - 2,309 3,285 976 42.3% 3.6029 3,005 am
PLACENTIA HARTWELL CORPORATION 466 1,679 2,266 sea 43.6% 1.3611 2,422 1,992
PLACENTIA K C A ELECTRONICS,INC. 519 1,248 1,813 566 45.3% 1.8194 1,491 887
PLACENTIA NOLLAC OIL COMPANY 12 960 1,605 544 66.7% 1.9307 259 772
PLACENTIA GEORGEA.JONES,IMPERIAL#2 WELL 29 723 1,108 386 53.2% 1.6463 314 314
PLACENTIA BRIGHT ARMOUR PLATING 78 689 915 326 55.3% 1.3014 165 287
PLACENTIA SUPERIOR PROCESSING 128 285 404 139 62.4% 0.6574 132 111
SANTA ANA STREMICKS HERITAGE FOODS LLC 3,635 734.507 930,531 196.024 26.7% 88.9928 2,109,695 743,727
SANTA ANA CHROMA SYSTEMS PARTNERS 1,252 138,6w 187,117 48,466 35.0% 167.2683 268,230 43,329
SANTA ANA IRWDDATS - 76,280 122,060 43,780 65.9% 207.7076 5,236 1,770
SANTA ANA UWMC HOSPITAL CORPORATION 8,038 62,205 75,646 23,441 44.9% 37.7209 78,648 78,60
SANTA ANA EL METATE FOODS,INC. 317 38,901 50,965 12,064 31.0% 3.8308 101,644 51,273
SANTA ANA GOGLANIAN BAKERIES 790 35,725 50,091 14,368 40.2% 8.0730 71,164 63,168
SANTA ANA EL TORO MEAT SHOP 128 29,093 38,278 7,183 24.7% 4.1564 80,921 24,979
SANTA ANA GEMINI INDUSTRIES INC. 97 $4,161 58,866 24,694 72.3% 5.6713 853 133,608
SANTA ANA MICRO SEMI CORP. 1,892 18,199 26,984 8,785 46.3% 30.4213 16,054 11,731
SANTA ANA DANONE WATERS OF N.A.-SANTA ANA - 16,073 25,001 8,928 55.6% 35.5826 4,218 8,009
SANTA ANA ORANGE COUNTY REGISTER 8,684 22,451 32,305 9,854 43.0% 16.1072 36,260 32,482
SANTA ANA ITT CANNON,A DIVISION OF ITT INDUSTRIES 14,959 18,512 27,760 9,248 60.0% 31.0324 16,173 13,8W
SANTA ANA TTM TECHNOLOGIES#1 162 14,453 20,589 6,136 42.5% 17.7899 21,084 11,125
SANTA ANA CULLIGAN WATER CONDITIONING - 7,641 12,179 4,538 69.4% 16.4408 368 6,248
H:`dept`tfn12101STREED1ExcellPermit Users\2002-03 recon and retos Oct 2004.)ds
•1
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 11 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Cost to Total Total Total
City Permit User Name Share of Fee Fee Correct Percentage Flow BOD SS
Property 2004-05 2004-05 Calculation Increase (MG) pbs) (Ibs)
Tax Adopted Proposed Method
SANTA ANA MECTRONIC HEART VALVES,INC. 527 9,143 12,795 3,652 39.9% 7.1976 16,359 10,187
SANTA ANA INTERNATIONAL FOOD SOLUTIONS,INC 712 9,842 11,866 2,012 20.4% 2.8088 31,460 4,153
SANTA ANA UNIVERSAL CIRCUITS INCORPORATED 647 6,839 10,664 3,825 66.9% 14.0630 2,053 4,802
SANTA ANA ASTECH ENGINEERED PRODUCTS 118 6,271 9,619 3,347 53.4% 13.9890 2,449 2,124
SANTA ANA EMSEE INC.#2 25 6,424 9,924 3,500 64.6% 13.4831 2,396 3,6W
SANTA ANA BURROWS IND.DBA MINUTEMAN PUMPING 177 8,092 10,014 1,922 23.8% 2.7786 24,011 4,613
SANTA ANA PIONEER CIRCUITS 315 6,204 9,105 2,902 48.8% 9.7955 6,549 4,053
SANTA ANA ALPHANETICSINC. 102 5,049 7,397 2,348 48.5% 9.3168 4,891 1,677
SANTA ANA MARKLAND MANUFACTURING,INC. 487 4,681 7,367 2,486 50.9% 9.0452 3,370 2,977
SANTA ANA TTM TECHNOLOGIES,INC 642 5,688 8,274 2,686 48.1% 6.6748 6,207 6,337
SANTA ANA FABRICATION CONCEPTS CORPORATION 776 5,379 8,082 2,704 60.3% 5.5691 5,655 8,054
SANTA ANA EMBEE INC.#1 30 3,164 4,951 1,787 56.6% 7.0848 026 1,688
SANTA ANA TEXTRON AEROSPACE 4,539 5,400 7,989 2,589 47.9% 7.0782 5,873 5,583
SANTA ANA ANOMIL ENT.D13A DANCO METAL SURFACING 150 3,468 6,284 1,797 51.6% 6.4452 2,679 3,417
SANTA ANA ANODYNE INC. 24 3,307 5,284 1,977 69.0% 5.6640 645 4,441
SANTA ANA EMBEE INC.#3 30 2,956 4,493 1,637 62.0% 0.0751 1,612 1,327
SANTA ANA ALUMINUM FORGE-DIV.OF ALUM.PRECISION 164 3,779 6,101 2,322 61.4% 2.2288 2,011 10,307
SANTA ANA WEBER PRECISION GRAPHICS 162 2,940 3,560 619 21.1% 1.0217 9,209 1,151
SANTA ANA CHROME TECHNOLOGY,INC. 217 2,231 3,426 1,195 53.5% 3.8819 1,278 2,027
SANTA ANA SOUTH COAST CIRCUITS#3 63 2,169 3,205 1,037 47.8% 3.5930 2,084 1,369
SANTA ANA RICOH ELECTRONICS#2 795 2,716 3,897 1,101 43.5% 1.7501 4,412 4,085
SANTA ANA ALUMINUM PRECISION PRODUCTS INC.CENTRAL - 2,320 3,106 786 33.9% 1.6766 5,120 1,955
SANTA ANA DATA ELECTRONIC SERVICES INC. 75 1,707 2,683 we 48.2% 3.1141 1,632 1,021
SANTA ANA ACTIVE PLATING INC. 1,686 2,535 849 50.4% 3.2736 1,163 796
SANTA ANA INTEGRATED AEROSPACE,INC. - 2,127 3,089 943 44.3% 1.5510 3,274 3,108
SANTA ANA GALLADE CHEMICAL INC. 178 1,752 2,548 798 45.4% 1.8846 2,303 1,880
SANTA ANA ACCURATE CIRCUIT ENGINEERING 63 1,816 2,379 562 31.0% 1.3752 4,283 1,027
SANTA ANA ALUMINUM PRECISION PRODUCTS INC.-SUSAN 124 1,695 2,487 792 46.7% 1.780 2,144 2,115
SANTA ANA VERTEO PROCESS SYSTEMS INC. - 1,427 2,138 709 49.7% 2.1927 1,271 1,271
SANTA ANA REID METAL FINISHING 134 1,166 1,762 588 50.3% 1.9402 939 910
SANTA ANA R B C TRANSPORT DYNAMICS CORP. 298 1,419 2,058 639 45.0% 1.0328 2,122 2,142
SANTA ANA SOUTH COAST CIRCUITS#4 72 990 1,510 520 52.5% 2.2302 431 266
SANTA ANA ELECTROSERVICES2000INC. 174 951 1,417 466 48.9% 2.1012 641 73
SANTA ANA ALMATRON ELECTRONICS,INC. 107 1,064 1,554 499 47.4% 1.7311 1,048 654
SANTA ANA BRASSTECH,INC - 1,265 1,833 568 44.9% 0.9141 1,908 1,908
SANTA ANA SOUTH COAST CIRCUITS#2 - 1,042 1,405 383 34.8% 1.2736 2,019 297
SANTA ANA PLEION CORPORATION#2 796 1,059 1,560 502 47.4% 1.0439 1,319 1,449
H:ldept\fin12101STREED1Exoel\Permit Users12002-03 recon and rates Oct 2004.)ds
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 12 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCS0 e0% Permit User Permit User Cost to Total Total Total
City Permit User Name Share of Fee Fee Correct Percentage Flaw BOD SS
Property 2004.05 2004-05 Calculation Increase (MG) Oys) (lbs)
Tax Adopted Proposed Method
SANTA ANA L&N UNIFORM SUPPLY COM PANY,I NC.(CLEAN) 1,136 1,644 608 44.7% 0.7479 1,753 1,781
SANTA ANA WHEEL SERVICES GROUP,INC - 822 1,293 471 57.3% 1.5619 219 773
SANTA ANA SOUTH COAST CIRCUITS,INC. 79 802 1,222 420 62.3% 1.6479 459 493
SANTA ANA PACIFIC QUARTZ,INC. 68 992 1,445 463 46.6% 0.8499 1,400 1,389
SANTA ANA SOUTH BAY CHROME SALES/CHROME EFFECTS 126 803 1,229 427 53.2% 1.4043 475 700
SANTA ANA ORANGE CONTAINER,INC. 9" 1,472 478 48.1% 0.6319 1,336 1,799
SANTA ANA MASK TECHNOLOGY INC. 126 612 902 280 47.4% 0.9910 611 397
SANTA ANA SELECT CIRCUITS 276 649 875 228 34.8% 0.7883 1,260 190
SANTA ANA S P S TECHNOLOGIES 2,954 3,103 4,695 1,492 48.1% 3.9208 3,404 3,404
SANTA ANA E F T FAST QUALITY SERVICE,INC. 88 471 738 267 56.6% 0.9880 122 357
SANTA ANA SANTA ANA PLATING(CNK CAPITAL) 44 649 795 246 44.9% 0.39e5 827 827
SANTA ANA CAL-TRONICS CIRCUIT INC.-SANTA ANA 433 e25 192 44.2% 0.8315 546 272
SANTA ANA LAM-PLATE TECH INC. 118 379 560 181 47.8% 0.7248 327 129
SANTA ANA OLYMPIC POWDER COATINGS INC. 108 453 685 212 4e.7% 0.5203 557 616
SANTA ANA GORI LLAS POLI SH I NG AN 0 PLATI NG 160 388 574 186 47.4% 0.6832 388 102
SANTA ANA MARGARETIS TEXTILE SERVICE 233 601 726 225 44.9% 0.3822 765 755
SANTA ANA MARK OPTICS INC. ee 459 708 249 64.2% 0.4100 395 880
SANTA ANA El A F INDUSTRI ES 231 425 608 184 43.3% 0.4151 e40 472
SANTA ANA PRECIOUS METALS PLATING 93 332 500 1e7 50.4% ae052 243 204
SANTA ANA STRIP CLEAN COMPANY 14 328 601 173 62.9% ae097 184 240
SANTA ANA PRECISION CIRCUITS WEST INC. 348 612 1e4 47.0% 0.4882 388 sm
SANTA ANA AQUA-CON COMPANY 60 310 476 lee 53.6% 0.e081 149 203
SANTA ANA ALLOY TECH ELECTROPOLISHING INC. 162 260 365 128 48.3% 0.4538 232 146
SANTA ANA MEDEVA PHARMACEUTICALS CA,INC. 131 2e6 395 119 44.9% 0.1921 401 401
SANTA ANA VICTORY CIRCUITS INC. - 204 267 53 25.7% 0.1476 551 65
SANTA ANA X Z X ELECTRONICS 97 168 212 54 34.5% 0.1524 324 88
SANTA ANA AUTO-CHLOR SYSTEM OF WASHINGTON,INC. 62 leg 212 43 25.6% 0.0545 483 121
SANTA ANA A&K DEBURRING AND TUMBLING 141 200 59 42.3% 0.1006 235 189
SANTA ANA DATA SOLDER INC 90 130 40 44.9% 0.0848 135 136
SANTA ANA HI-TECH STENCILS - 35 61 1e 44.8% 0.0272 53 51
SANTA ANA LAM LIGHTING INC. 2,040 911 1,324 - 0.0% 0.6660 1,339 1,394
SANTA ANA PRECISION POWDERCOATING INC. 138 114 166 28 20.4% 0.1693 143 84
SEAL BEACH NAVAL WEAPONS STN SEAL BCH CD 043 - 7,298 10,575 3,277 44.9% 6.2734 10,995 10,995
SEAL BEACH ACCURATE METAL FABRICATORS - 3,638 5,124 1,5e8 44.9% 2.6550 5,327 5,327
STANTON ALL METALS PROCESSING OF O.C.INC. 280 2,160 3,236 1,058 48.4% 2.9329 2,273 2,239
STANTON PURE-CHEM PRODUCTS COMPANY INC. 70 234 344 110 46.8% 0.1891 317 380
TUSTIN CITY OF TUSTIN WATER SERVICE(17TH ST.) - 38,081 58,610 20,629 56.9% 96.3091 19 2,428
H:\deptVtn121 OkSTREED1Excel\Permit Users12002-03 recon and rates Oct 2004.)do
9/29/2004 Estimated Impact on Permit Users by Flow, BQD and SS Page 13 of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD 60% Permit User Permit User Cost to Total Total Total
Share of Fee Fee Correct Percentage
City Permit User Name Property 2004-05 2004-06 Calculation Increase Flow BCD SS
(MG) pbs) pbs)
Tax Adopted Proposed Method
TUSTIN CITY OF TUSTIN,WATER SERVICE(MAIN ST.) 7,625 11,923 4,299 5e.4% 19.2910 6e2 1,460
TUSTIN TUSTIN HOSPITAL AND MEDICAL CENTER 8,252 11,958 3,705 44.9% 6.9627 12,432 12,432
TUSTIN CITY OF TUSTIN-MAINTENANCE YARD - 682 845 283 45.1% 0.4317 865 873
TUSTIN TOYOTA RACING DEVELOPMENT#2 242 626 769 233 44.4% 0.4088 798 741
TUSTIN CHEEK ENGINEERING&STAMPING 244 307 439 132 43.0% 0.3671 442 261
TUSTIN WESCO SERVICES - 110 139 29 26.6% 0.0722 293 43
TUSTIN REVERE TRANSDUCERS,INC. 1,184 1,024 1,508 323 27.3% 1.2217 1,202 1,162
WESTMINSTER VENCOR INC DBA VENCOR HOSP-ORANGE COUNTY 1,284 8,164 11,831 3,666 44.9% 5.8993 12,300 12,300
WESTMINSTER LINDBERG HEAT TREATING CO.-ALUMATHERM 708 2,160 3,305 1,125 51.6% 4.0551 1,408 1,408
WESTMINSTER SOUTHERN CALIFORNIA EDISON 1,528 2,228 700 45.8% 1.3620 2,114 2,099
YORBA LINDA AERA ENERGY LLC 264 184,954 283,470 98,516 63.3% 440.4840 62,594 29,538
YORBA LINDA METRO WATER DISTRICT OF 50 CA - 2,690 3,902 1,212 45.1% 2.0152 3,995 4,000
YORBA LINDA PLEGEL OIL COMPANY(BLATTNER-A.H.A.) 168 786 1,222 437 55.6% 1.9693 115 131
YORBA LINDA COLUMBINE ASSOCIATES 12 68 101 33 48.2% 0.1483 50 5
YORBA LINDA SHERWIN D.YCELIN 6 65 99 34 52.9% 0.1510 25 12
Total for Permit Users 904,416 8,490,663 11,478,853 2.913,020 34.0% 6,117.8307 17,914,101 7,478.311
Total for All OCSD 28,000,000 102.752,685 91,25a0000 173,514,000 177.014,000
Permit User Percent of Total for All OCSO 11% 7% 10% 4%
Average Permit User 2,001 18,785 25,396 6,445 34.3% 13.6350 39,633 18,545
Average Single Family Residence 116 0.0923 159 169
H:\dept\M\210\STREED\Exoel\Permit Users\2002-03 recon and rates Oct 2004.x1s
9/29/2004 Page 1 of 13
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actual Discharlges
Estimated
OCSD 60% 2002-03 2002-03 2002-03
City Permit User Name Share of Total Total Total 2004-05 2004-05 2005.00 2006-07 2007-08
Property Flaw Boo SS Adopted Proposed Estimated Estimated Estimated
Tax (MO) Qbs) Obs)
Flow Rate per Mlllion Gallons $ 368.58 S 577.30 S 637.56 S 711.27 S 773.32
800 Rate per 1000 Pounds $ 248.55 $ 270.68 $ 288.50 $ 311.21 S 330.63
SS Rate per 10110 Pounds $ 230.46 S 414.27 $ 432.14 $ 454.10 S 473.50
ANAHEIM ALSTYLE APPAREL-ACTIVEWEAR MFG,CO.INC. 3,875 360.6536 1,541,360 501,730 636,674 833,276 691,436 964,093 1,025,940
ANAHEIM M C P FOODS INC. 251 16.4667 1,654,067 46,540 403,506 440,674 479,098 516,639 648,600
ANAHEIM NOR-CAL BEVERAGE CO.INC.(MAIN) 1,898 38.0144 827,333 122,302 249,159 297,107 316,352 340.738 361,500
ANAHEIM NOR-CAL BEVERAGE CO.INC.(TETRA) 23.3647 640,446 33,930 151,03a 173,844 185,490 200,23e 212,784
ANAHEIM DISNEYLAND RESORT-RCA 810 94.7449 107,643 197,643 131,125 190,003 202,782 218,589 232,099
ANAHEIM EXPO DYEING AND FINISHING INC. 656 105.4495 101.647 34,471 87,230 118,884 128,732 140,935 161 A65
ANAHEIM SUNDOR BRANDS INC.A PROCTER&GAMBLE CO 5,122 27.1223 380,115 34,457 107,719 127,408 136,075 147,012 156,318
ANAHEIM STEPAN COMPANY 2,670 7.3083 210.007 647 55,217 61,518 05,725 71,083 75,600
ANAHEIM STEINER CORP.DBA AMERICAN LINEN SUPPLY - 21.6522 136,240 39,368 50,947 65,350 69,772 76,301 60,011
ANAHEIM PRECISION ANODIZING AND PLATING INC. 308 34.7605 11636 150,469 51,016 86,175 91,132 97,220 102,479
ANAHEIM ANAHEIM MEMORIAL MEDICAL CENTER - 33.3875 69,613 60,613 46,207 60,956 71,462 77,029 81,790
ANAHEIM DYNAMIC DETAILS INC. 28 46.6497 28,668 20,316 31,035 46,363 50,185 64,802 60,881
ANAHEIM SIOUX HONEY ASSOCIATION 00-OP 690 2.1565 140,914 1,140 36,094 30,665 42,527 45,912 40,700
ANAHEIM DON MIGUEL MEXICAN FOODS INC. 303 14.4226 70,233 36,480 33,221 44,201 47,098 60,720 63,812
ANAHEIM K CA ELECTRONICS INC. 3,217 39.2034 10,300 9,990 10,393 29,560 32,284 35,629 38,453
ANAHEIM WEST ANAHEIM MEDICAL CENTER 1,068 16.7858 34,99a 34,008 23,231 33,663 35,923 38,727 41,121
ANAHEIM HARRYS DYE d WASH INC 182 21.0879 25,13a 14,600 17,602 25,027 27,000 20,454 31,630
ANAHEIM TAC WEST,INC. - 11.601 46,692 11,789 18,710 24,247 25,092 28,171 30,023
ANAHEIM CITY OF ANAHEIM-WATER SERVICES - 0.0756 95 71,650 10,350 33,219 34,667 36,897 38,600
ANAHEIM U.W.M.C.HOSPITAL CORPORATION 3,683 10.6352 22,174 22,174 14,710 21,326 22,700 24,537 26,053
ANAHEIM BRIDGFORD FOODS CORPORATION 7e0 9.1297 27,877 19,171 14,a66 20,758 22,146 23,877 25,352
ANAHEIM WEYERHAEUSER COMPANY 7,751 9.11S3 28,073 16,304 13,728 10,075 20,380 22,003 23,388
ANAHEIM IDEAL ANODIZING INC. 264 6.6475 718 41,707 13,385 22,580 23,871 25,459 26,828
ANAHEIM MULTI-FINELINE ELECTRONIX INC. 847 15.1614 9,090 7,526 9,866 14,575 15,801 17,311 18,690
ANAHEIM S S 8 POLISHING/PLATING 11 13.7040 873 10,377 8,888 16,175 17,362 10,820 20,061
ANAHEIM ANAHEIM GENERAL HOSPITAL 1,997 7.9434 16,50 16,50 10,993 16,930 17,000 18,326 10,459
ANAHEIM DANONE WATERS OF N.A.-ANAHEIM 666 17.9176 995 654 6,983 10,843 11,960 13,305 14,447
ANAHEIM DRS TECHNOLOGIES INC 1,093 13.0501 4,543 4,643 7,022 10,646 11,694 12,759 13,744
ANAHEIM ARTISTIC PLATING 8,METAL FINISHING INC. 280 11.4465 6,004 4,635 61615 91966 10,630 11,694 12,704
ANAHEIM DELPHI AUTOMOTIVE SYSTEMS 2,234 9.9865 4,398 4,071 5,930 0,074 9,741 10,654 11,483
ANAHEIM INTEC PRODUCTS INC. 210 3.9450 609 29,107 8,643 14,511 15,280 18,228 17,044
ANAHEIM HAWK INDUSTRIAL UNIFORM 114 5.9494 1o,069 7,830 0,663 0,404 10,082 10,922 11,630
ANAHEIM MICROMETALS INC.82 792 5.2761 6,325 3,889 4,440 6,373 6,873 7,492 8,017
ANAHEIM UNIVERSAL ALLOY CORP. 066 5.8363 6,360 2,964 4,113 5,929 6,417 7,019 7,620
ANAHEIM CEROMET INC. 311 2.0917 16,012 1,948 4,966 6,076 6,606 7,044 7,602
ANAHEIM AMERICAN CIRCUIT TECHNOLOGY INC. 322 6.6465 2,445 2,232 31590 5,423 5,007 0,602 7,005
ANAHEIM PRIVATE LABEL LABORATORIES 413 0.2325 18,055 1,151 4,848 5,498 5,855 6,307 0,093
ANAHEIM COPPER CLAD MULTILAYER PRODUCTS INC. - 6.0916 1,603 4,034 3,237 5,045 5,462 5,963 0,376
H:ldeptfin121 MSTREED\Excel\Permft Users12002-03 recon and rates Oct 2004.xls
9/29/2004 Page 2 of 13
Estimated Impact on Permk Users to 2007-08
Based Upon 2002-03 Actual Discharges
Estimated
OCSD 80% 2002-03 2002-03 2002-03
City Permit User Name Share of Total Total Total 200405 2004-05 2006-06 2006-07 2007-08
Property Flow BOD 66 Adopted Proposed Estimated Estimated Estimated
Tax (MG) (1be) pbs)
Flow Rate per Million Gallons S 368.50 $ 577.30 S 637.66 $ 711.27 $ 773.32
SOD Rate per 1 QQ0 Pounds $ 248.65 E 270.68 $ 260.60 $ 311.21 $ 330.53
SS Rate per 1Q00 Pounds $ 230.45 $ 414.27 $ 432.14 $ 454.19 $ 473.60
ANAHEIM LINCO INDUSTRIES INC. 64 3.2695 677 10,910 3,901 6,581 6,985 7,482 7,008
ANAHEIM MAGNETIC METALS CORP 944 1.6661 8,253 6,761 4,046 6,694 5,948 6,384 6,760
ANAHEIM Y K K(U.S.A)INC. 2,284 5.8158 2,184 1,216 2,903 4,338 4,737 6,227 5,642
ANAHEIM J a H DEBURRING INC.#2 25 1.3247 4,837 8,936 3,821 6,776 6,102 6,506 61854
ANAHEIM BLACK OXIDE INDUSTRIES INC. 55 4.6014 697 1,924 2,200 3,e03 3,924 4,318 4,651
ANAHEIM A P W ENCLOSURE SYSTEMS,LLC 408 2.7002 4,060 2,663 2,639 3,761 4,044 4,394 4,091
ANAHEIM CLASSIC PLATING INC. - 3.2877 1,014 1,288 2,024 3,102 3,383 3,728 4,019
ANAHEIM ANAHEIM PLATING A POLISHING INC. SB 3.6712 11605 1,320 2,007 3,101 3,374 3,710 3,905
ANAHEIM BOEING COMPANY-BLDG.271 1,606 2.1347 3,712 3,627 2,574 3,740 3,990 4,321 4,586
ANAHEIM GENERAL CERAMICS LLC - 2.7963 456 4,712 2,268 3,660 3,051 4,271 4,546
ANAHEIM GMT DYNAMICS 1.8364 3,402 3,402 2,333 31390 3,822 3,010 4,166
ANAHEIM CALIFORNIA CUSTOM SHAPES,INC. 1e8 1.5832 5,692 816 2,192 2,792 3,003 3,207 3,491
ANAHEIM CREST COATING INC. 272 1.3333 5,674 1,146 2,160 2,763 2,953 3,203 3,416
ANAHEIM MILBANK WEST INC. 250 1.6581 3,063 2,200 1,968 2,811 3,016 3,271 33488
ANAHEIM ESSEX ELECTRIC INC 916 1.7635 3,462 1,869 11956 2,735 2,936 3,187 3,309
ANAHEIM GUNTHER ATHLETIC SERVICE 22 2.55% 1,716 1,373 1,690 2,509 2,718 2,670 3,194
ANAHEIM MURRIETTA CIRCUITS INC. 88 2.1761 1,700 1,796 1,664 2,461 2,655 2,694 3,098
ANAHEIM ECONOLITE CONTROL PRODUCTS INC. 353 1.4443 2,550 2,269 1,707 2,482 2,635 2,860 3,033
ANAHEIM CYTECH ENGINEERED MATERIALS - 1.1798 2,372 2,373 1,520 2,306 2,462 2,655 2,620
ANAHEIM STAINLESS MICRO-POLISH INC. 93 2.3064 933 309 1,165 1,711 1,872 2,070 2,237
ANAHEIM ADVANCE TECH PLATING INC.02 126 1.7249 604 1,031 1,176 1,635 1,079 2,165 2,306
ANAHEIM NEVILLE CHEMICAL COMPANY 0 1.6686 700 657 1,Q56 1,598 1,741 1,917 2,006
ANAHEIM UOP LLC - 1.8723 635 e35 999 1,516 1,652 1,818 1,959
ANAHEIM KINSBURSKY BROTHERS SUPPLY INC. 71 1.4611 1,197 1,162 1,113 1,649 1,770 1,930 2,076
ANAHEIM SUPERIORPLATING - 1.9700 325 325 885 1,381 1,491 1,651 1,766
ANAHEIM TAORMINA INDUSTRIES INC.#4 524 0.9670 2,138 1,219 1,179 1,842 1,700 11807 2,032
ANAHEIM PRECISION PAINTING 204 0.3766 760 4,826 1,470 2,422 2,545 2,696 2,828
ANAHEIM AMERIMAX BUILDING PRODUCTS INC. 265 1.4767 2" 1,614 990 1,588 1,710 1,660 1,088
ANAHEIM ALLIED PACIFIC METAL STAMPING 478 0.66" 3,230 513 1,132 1,402 1,609 11635 1,742
ANAHEIM LEACH INTERNATIONAL 156 1.6300 285 498 780 1,224 1,33$ 1,473 1,600
ANAHEIM NU-TECPOW13ER COATING 198 0.6Q09 1,820 1,340 093 1,305 1,407 1,602 1,701
ANAHEIM I P C CAL FLEX INC. 123 0.8600 1,729 420 648 1,141 1,231 1,343 1,428
ANAHEIM JELLCO CONTAINER INC. 670 0.8923 1,160 1,701 049 1,416 1,611 1,620 1,724
ANAHEIM ANAHEIM TRUCK DEPOT#2 BIN WASH 524 0.6163 1,285 1,286 653 1,238 1,310 1,422 1,610
ANAHEIM SECHRIST INDUSTRIES,INC. - 0.6401 1,117 1,447 an 1,214 1,292 1,389 1,472
ANAHEIM ELECTRCRACK PRODUCTS CO.INC. 471 0.6610 1,201 999 7" 1,063 1,137 1,227 1,305
ANAHEIM R T I ELECTRONICS,INC. 8 0.5217 1,024 1,020 622 1,005 1,073 1,157 1,220
ANAHEIM TAYLOR-DUNN MANUFACTURING COMPANY 1,464 1.2090 2,480 2,432 1,642 2,377 2,537 2,736 2,906
H:rdeptltfn12101STREED1Excel\Permit Usera12002-03 reccn and rates Oct 2004.xis
9/29/2004 Page 3 of 13
Estimated Impact on Permft Users to 2007-013
Based Upon 2002-03 Actual Discharges
Estimated
CCSD 609E 2002-03 2002-03 2002-03
City Permit User Name shore of Total Total Total 2004-05 2004.05 2005-08 2006-07 2007-08
Properly Flow BOD SS Adopted Proposed Estimated Estimated Estimated
Tax (MG) Qbs) pbs)
Flow Rate per Million Gallons $ 3e8.58 $ 577.30 S 637.65 $ 711.27 $ 773.32
800 Rate per 1000 Pounds $ 248.55 $ 270.66 $ 288.50 $ 311.21 $ 330.63
SS Rate per 1000 Pounds $ 238.46 $ 414.27 $ 432.14 $ 454.19 $ 473.60
ANAHEIM MILLENNIUM CIRCUITS SERVICES CORP 0.5159 1,299 161 551 716 773 844 805
ANAHEIM PICOFARAD INC. 62 0.5664 an 792 554 825 884 058 1,020
ANAHEIM RTRINDUSTRIES 48 0.3976 829 829 650 797 851 917 974
ANAHEIM RIGIFLEX TECHNOLOGY INC. 87 0.6432 508 234 419 696 656 722 776
ANAHEIM LINVATEC CORPORATION 38 0.3281 684 684 454 e58 702 757 804
ANAHEIM PACIFIC UTILITY PRODUCTS INC. 169 0.5937 235 347 360 550 596 653 701
ANAHEIM IKON POWDER COATING - 0.3639 722 344 386 5" 689 640 683
ANAHEIM BRIDGEMARK CORP-DOWLING#2 - 0.7155 - - 284 413 450 509 553
ANAHEIM AQUARIAN COATINGS CORP 21 0.2813 687 587 380 564 602 640 669
ANAHEIM A R O SERVICE 243 0.2962 474 493 345 504 539 502 819
ANAHEIM PRECON,INC. 34 0.2709 573 384 334 470 504 545 650
ANAHEIM A A R POWDER COATING INC. - 0.4615 107 154 253 381 414 456 401
ANAHEIM ANAHEIM EXTRUSION CO.INC. 569 0.4868 943 993 651 948 1,012 1,001 1,158
ANAHEIM UNITED CUSTOM POLISHING&PLATING 49 0.4066 197 181 243 364 39e 434 467
ANAHEIM ADVANCE TECH PLATING INC. - 0.4270 78 173 218 340 370 407 438
ANAHEIM POWDERCOAT SERVICES INC.#1 25 0.3068 264 249 238 351 379 413 442
ANAHEIM PACIFIC IMAGE TECHNOLOGY,INC. 0.4080 97 94 197 301 320 383 392
ANAHEIM S M T DYNAMICS LLC 0.2662 176 170 180 269 290 317 340
ANAHEIM ELECTRO METAL FINISHING CORPORATION 91 0.1443 292 263 188 271 290 313 332
ANAHEIM EXQUISITE DESIGNS INC. 0.2938 27 27 121 188 207 230 249
ANAHEIM POWDERCOAT SERVICES INC.#4 0.2006 127 127 136 203 219 240 257
ANAHEIM POWDERCOAT SERVICES INC.#2 25 0.1170 244 244 162 235 250 270 287
ANAHEIM ACROBURR INC.#2 55 0.1726 106 131 121 183 197 215 231
ANAHEIM POWDERCOAT SERVICES INC.#3 0.1214 168 166 126 184 107 214 228
ANAHEIM M T S MICROELECTRONICS INC. 0.0937 194 193 129 187 lee 215 228
ANAHEIM OLIVE OIL CO. 65 0.1207 95 76 86 127 137 150 161
ANAHEIM DETAILS INC#11,DBA DYNAMIC DETAILS INC. 100 0.0867 181 181 12C 174 185 200 212
ANAHEIM TECHPLATE ENGINEERING CO.INC. - 0.0513 108 120 80 11e 125 135 144
ANAHEIM TRANSLINE TECHNOLOGY INC. 213 0.3058 160 158 221 335 364 400 431
ANAHEIM REMEDY ENVIRONMENTAL SERVICES - 0.0225 47 47 31 45 48 62 55
ANAHEIM CUSTOM POWDER COATINGS - 0.0189 39 39 28 38 40 44 46
ANAHEIM VEECO ELECTRO FAB INC.#2 89 0.1846 41 41 88 134 147 162 176
ANAHEIM ALL METAL PAINT STRIPPING INC.#2 508 0.0437 164 144 89 120 134 144 153
ANAHEIM A P W ENCLOSURE SYSTEMS LLC SOUTH 4,473 2.5000 1,227 1,570 1,836 2,481 2,687 2,941 3,165
ANAHEIM H.KOCH d SON$COMPANY 402 0.3262 212 212 223 333 361 324 423
ANAHEIM DISNEYLAND RESORT 559,204 354.6020 731,345 731,346 406,857 705,636 753,100 811,976 682.229
BREA HEALTH CARE APPAREL SERVICES 442 15.6040 23,410 12,349 14,480 20,405 21,977 23,924 25,577
BREA GERARD TILE 890 4.7316 2,801 53,895 16,291 25,817 27,115 283716 30,104
H:Wept\fln12701STREED1Excel'Permit Usere12002-03 recon and rates Oct 2004.x1s
9/29/2004 Pape 4 of 13
Estimated Impact on Permft Users to 2007-08
Based Upon 2002-03 Actual 01schar0es
Estimated
OCSO 60% 2002-03 2002-03 2002-03
My PermIt User Name Share of Total Total Total 2004-05 2004-05 2005-08 20OS-07 2007-08
Property Flour BOD SS Adopted Proposed Estimated Estimated Estimated
Tax (MG) 0s) (1hs)
Flow Rate per Mlllicn Gallons $ 308.50 S 577.30 S 637.66 S 711.27 $ 773.32
800 Rate per 1000 Pounds $ 248.65 S 270.66 S 288.60 $ 311.21 S 330.63
SS Rate per 1000 Paunch S 238.45 S 414.27 $ 432.14 $ 454.19 S 473.60
BREA COOPER AND BRAIN INC. 4 15.4902 9,708 2,980 8,839 12,814 13,975 15,404 10,611
BREA WINONICS(BREA) 603 16.1971 5,180 3,760 8,162 12,306 13,441 14,836 10,013
BREA HARTE-HANKS SHOPPERS 1,330 4.8353 21,063 7,905 0,902 11,768 12,676 13,566 14,444
BREA KIRKHILL RUBBER CO(SOUTH) 628 8.0408 9,630 10,212 7,795 11,484 12,323 13,361 14,243
BREA ELECTRONIC PRECISION SPECIALTIES INC. 121 8.4644 400 2,280 3,784 6,960 6,619 7,204 7,783
BREA BREA COMMUNITY HOSPITAL 3,176 3.6041 7,306 7,306 4,860 7,027 7,469 8,004 6,564
BREA ORO RIM INC 1,690 5.2437 3,313 3,626 3,697 6,354 5,822 e,362 6,619
BREA SRISTOL INDUSTRIES 884 4.3758 2,394 2,609 2,830 4,255 4,808 5,042 6,410
BREA FINELINE CIRCUITS d TECHNOLOGY INC. 118 1.0779 2,628 296 1,121 1,458 1,673 1,710 13642
BREA SCISOREK 8 SON FLAVORS,INC. 375 0.8409 3,114 418 1,164 1,602 1,615 1,757 1,078
BREA HARBOR TRUCK BODIES INC. 378 0.4984 961 918 641 927 991 1,070 1,137
BREA MORAVEK BIOCHEMICALS INC. 3 0.8824 261 201 371 501 810 071 722
BREA CENTRAL POWDER COATING - 0.2662 670 147 274 360 307 433 463
BREA ENGRAVERS INK CO 65 0.1137 64 250 115 184 108 211 224
BREA KIRKHILL RUBBER CO(SOUTH) 1,026 - - - 0 0 0 0 0
BREA AERA ENERGY LLC#2 246 0.0821 171 171 114 165 176 189 201
BUENA PARK DEAN FOODS CO.OF CALIF.INC(MILK PLANT) 1,418 38.2970 461,307 163,225 169.434 215,480 230,059 247,117 201,693
BUENA PARK SABA TEXTILES INC. 1,009 129.0030 213,403 100,129 124.465 173.71a 187,082 203,647 217,708
BUENA PARK SEVEN-UP BOTTLING COMPANY 766 34.6324 405,378 30,279 120,741 142,284 152,116 164,543 175,108
BUENA PARK AMERIPEC INC. 584 22.1770 332,031 22,660 08,278 112,230 119.910 129,600 137.642
BUENA PARK DEAN FOODS CO.OF CALIF.INC.(ICE CREAM) 815 10.1385 101,045 79,231 67,626 67,680 02,033 09,539 106,186
BUENA PARK PEPSI-COLA BOTTLING GROUP 3,837 18.5449 189,766 26,282 60,274 72,965 77,934 64,191 89,516
BUENA PARK K U A TEXTILES INC. 650 28.6471 50,330 50,808 35,259 51,327 64,870 59,200 03,003
BUENA PARK SUNCLIPSE,INC.OBA CORRU KRAFT II 2,347 10.7168 71,270 67,362 37,727 53,386 66,605 60,309 63,742
BUENA PARK CLEUGH'S RHUBARB COMPANY 216 10.3142 66,100 17,371 20,344 36,466 38,022 42,021 44,660
BUENA PARK ULTRA WHEEL COMPANY 1,212 15.6033 11,085 10,244 11,060 16,425 17,764 10,414 20,013
BUENA PARK PRIMATEX INDUSTRIES OF CA INC 335 128380 6,273 14,788 0,817 16,235 16,354 17,709 19,003
BUENA PARK GEOR0IA PACIFIC CORPORATION 3,808 2.6314 21,288 3,772 7,110 0,701 9,380 10,132 10,773
BUENA PARK CROCKETT CONTAINER CORP. 676 0.0970 16,401 1,106 4,444 51169 5,610 5,961 6,337
BUENA PARK MEADPACKAGING 1,808 1.6054 6,879 3,471 3,240 4,400 4,609 5,073 5,301
BUENA PARK TRIM-LOK/R.T.P. 950 3.8647 1,376 1,376 2,006 3,174 3,460 3,802 4,026
BUENA PARK HANSON-LORAN CO.,INC. 270 1.1809 6,872 911 2,112 2,649 2,841 3,051 3,286
BUENA PARK ALLOY DIE CASTING CO. 450 1.7335 2,222 1,916 1,648 2,395 2,674 2,764 2,081
BUENA PARK WEYERHAEUSER COMPANY#2 - 0.5313 1,108 1,108 735 1,065 1,137 1,228 1,302
BUENA PARK GENERAL CONTAINER CORPORATION 340 0.4284 813 709 520 701 814 8a0 936
BUENA PARK GARDNER LITHOGRAPH,INC. 327 0.4078 665 685 484 704 763 814 888
BUENA PARK DERM COSMETICS LAB'S INC. 169 0.1070 1,047 165 339 413 442 477 507
COSTA MESA WEST NEWPORT OIL COMPANY 0 43.9588 174,668 18,133 03,044 80,173 66,269 03,860 100,319
H:ldeIMfln1210kSTREED1ExceilPermlt Users12002-03 recen and rates Oct 2004.x1s
9/29/2004 Pape 5 of 13
Estimated Impact on Permft Users to 2007-08
Based Upon 2002-03 Actual Dlscharpes
Estimated
OCSD 60% 2002-03 2002-03 2002-03
City Permfl User Name Share of Total Total Total 2004-05 2004-05 2005-06 2006-07 2007-C8
Property Flow BOD SS Adopted Proposed Edmated Estimated Estimated
Tax (MG) (Ibs) 0bs)
Flow Rate per MI lion Gallons S 366.58 $ 577.30 S 637.65 S 711.27 S 773.32
800 Rate per 1000 Pounds S 248.55 $ 270.68 $ 288.50 S 311.21 $ 330.63
SS Rate per 1000 Pounds S 230.46 $ 414.27 $ 432.14 $ 454.19 $ 473.50
COSTA MESA FAIRVIEW STATE HOSPITAL - 32.8890 157,171 78,440 69,693 $4,028 10OX3 107,936 114,520
COSTA MESA LOS ANGELES TIMES COMMUNICATIONS LLC 8,296 10.5468 60,430 7,405 20,670 25,517 27,352 29,676 31,641
COSTA MESA I C N PHARMACEUTICALS INC. 2,585 18.5630 5,421 5,421 9,482 14,430 16,742 17,353 18,714
COSTA MESA VELIE CIRCUITS INC. 88 8.5218 4,055 2,008 4,628 6,840 7,471 8,235 8,881
COSTA MESA SANMINA CORPORATION(Al RWAY) 1,671 7.080 1,623 2,300 3,765 6,829 6,362 7,017 7,569
COSTA MESA MESA CONSOLIDATED WATER DISTRICT - 4.6293 1,776 6,621 3,464 5,440 6,860 6,353 0,781
COSTA MESA SANMINA CORPORATION(REOHILL) 1,061 5.4701 1,210 908 2,635 3,884 4,231 4,682 5,063
COSTA MESA EATON CORPORATION 102 2.4684 2,565 6,437 3,C93 4,603 6,116 5,409 5,820
COSTA MESA TOYOTA RACING DEVELOPMENT 242 2.2662 4,310 4,185 2,908 4,210 4,499 4,866 5,161
COSTA MESA PRIME TECHNOLOGIES,INC. 246 2.CO57 5,160 735 2,200 2,863 3,069 3,370 3,609
COSTA MESA SEMICOA SEMICONDUCTORS 137 1.9549 1,191 1,191 1,312 1,982 2,124 2,324 2,493
COSTA MESA CRITERION MACHINE WORKS 140 0.3265 405 551 367 642 680 627 667
COSTA MESA RAILMAKERS,INC. 51 0.0976 203 203 135 106 209 225 239
COSTA MESA IRVINE SENSORS CORP. e99 0.2916 314 263 240 362 390 424 454
COSTA MESA AVIATION EQUIPMENT STRUCTURES,INC. 535 0.2834 665 5" 380 651 588 034 674
CYPRESS BOIENG COMPANY(CYPRESS) 880 1.2994 2,709 2,709 1,700 2,606 2,781 2,086 3,183
CYPRESS TAYCO ENGINEERING,INC. - 0.6582 1,732 1,298 983 1,386 1,480 11597 1,696
CYPRESS HYATT DIE CASTING&ENGINEERING CORP. 630 0.5373 1,120 1,120 744 11078 1,160 1,240 13310
FOUNTAIN VALLEY PRO-TECH - 16.2280 8,011 2,736 8,257 12,094 13,203 14,668 15,720
FOUNTAIN VALLEY PAYTON TECHNOLOGY CORP - 13.6617 5,202 5,292 7,009 11,600 12,518 13,761 14,012
FOUNTAIN VALLEY KODAK PROCESSING LABS 143 9.9591 10,682 3,110 7,114 91961 10,831 11,880 12,768
FOUNTAIN VALLEY OMNI METAL FINISHING,INC. 130 10.0612 784 3,046 4,630 7,262 7,067 0,784 0,482
FOUNTAIN VALLEY CUSTOM ENAMELERS INC. 143 1.1772 784 768 812 1,210 1,309 1,430 13533
FOUNTAIN VALLEY SANMINA CORPORATION 116 1.1613 1,301 146 782 1,077 1,172 1,290 1,369
FOUNTAIN VALLEY UNITED CIRCUIT TECHNOLOGY INC. 57 0.8111 696 463 582 so 918 1,004 1,077
FOUNTAIN VALLEY KENLEN SPECIALITIES INC. 126 0.5638 276 210 320 491 534 587 032
FOUNTAIN VALLEY A 10 ELECTROPOLISH 167 0.6794 94 174 276 432 472 520 561
FULLERTON KIMBERLY-CLARK WORLDWIDE,INC. 19,607 451.67" 201,610 422,093 317,216 490,163 628,510 575,692 615,762
FULLERTON FULLERTON CULTURED SPECIALTIES $60 31.4260 518,277 117,240 1e8,3e8 207,019 22OA44 238,917 251,145
FULLERTON OAE SHIN USA,INC. 1,180 132.8300 199,711 116,954 120,484 170091 192,00 209,749 224,108
FULLERTON VAN LAW FOOD PRODUCTS,INC. 564 4.6980 440,167 187,635 165,874 190,584 211,054 225,544 237,962
FULLERTON Y2K TEXTILE CO.,INC. 1,996 119.7883 210,096 48,368 1101362 146,734 160,736 175,620 108,240
FULLERTON CALIF STATE UNIV®FULLERTON 98.2000 61,890 61,424 71,197 104,305 112,779 123,233 132,094
FULLERTON FAIRCHILD FASTENERS 833 26.2354 23,840 27,310 22,100 32,915 35,408 38,466 41,102
FULLERTON WORLD CITRUS WEST 1,811 6.3974 82,474 14,836 26,306 323164 $4,264 38,956 39,232
FULLERTON ST.JUDE MEDICAL CENTER - 12.7750 26,636 26,636 17,680 25,619 27,340 29,474 31,296
FULLERTON ORANGE COUNTY METAL PROCESSING 50 19.6506 366 26,641 13,424 22,024 23,a71 25,001 27,411
FULLERTON BECKMAN COULTER,INC. 6,432 14.4015 16,803 17,088 13,361 10,714 21,172 22,973 24,605
H:ldept111n1211ASTREED1ExceINPermlt Usem=02-03 recon and rates Oct 2004.xis
9/29/2004 Page 6 of 13
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actual Olscherpes
Estimated
CCSD 60% 2002-03 2002-03 2002-03
City Permit User Name Share of Total Total Tatel 2004-05 2004-05 2005-08 200S-07 2007-08
property Flaw 800 SS Adopted Proposed Estimated Estimated Estimated
Tex (MG) (Ibs) pbs)
Flow Rate per Mllllon Gallons S 360.58 $ 577.30 $ 637.65 S 711.27 S 773.32
800 Rate per 1 OQO Pounds $ 240.55 S 270.68 $ 200.50 $ 311.21 $ 330.63
SS Rate per 1000 Pounds $ 230.46 $ 414.27 $ 432.14 $ 454.19 $ 473.50
FULLERTON P C AMETAL FINISHING,INC. 98 16.3000 3,700 4,958 8,109 12,465 13,601 14,998 16,175
FULLERTON WINONICS,INC. 59 16.2636 919 2,108 0,725 10,510 11,644 12,010 13,878
FULLERTON WESTERN YARN DYING 248 0.7536 11,160 2,130 6,778 7,810 8,454 9,263 9,929
FULLERTON NELCO PRODUCTS,INC. 283 8.0274 5,459 5,469 5,017 8,373 0,052 9,888 10,597
FULLERTON JOHNSON CONTROLS BATTERY INC. 2,174 9.0172 1,835 5,241 5,064 7,801 6,572 9,396 10,084
FULLERTON CARGILL INC. 1,107 6.2634 7,742 5,020 5,426 71765 0,390 0,137 0,772
FULLERTON SUNCLIPSE,INC.(CORRUGATOR PLANT) 1,032 1.6164 13,838 11,908 e,874 9,611 10,1ea 103864 11,461
FULLERTON WEIDMANN WATER CONDITIONERS,INC. 20 7.0213 213 4,060 3,941 61313 6,866 7,644 8,119
FULLERTON MONOGRAM SYSTEMS 1,979 3.4190 2,881 83691 4,026 6,312 %723 7,230 7,664
FULLERTON B 1 TECHNOLOGIES,INC. 1,554 2.2036 2,590 2,614 2,079 3,056 %282 3,661 3,708
FULLERTON KRYLER CORPORATION - 3.1262 250 260 1,300 2,016 2,217 2,464 2,672
FULLERTON SUNCLIPSE INC. 13032 1.1293 3,443 2,430 1,853 2,593 2,700 2,981 3,164
FULLERTON SCIENTIFIC SPRAY FINISHES,INC. 25 1.6540 1,426 1,105 1,226 1,799 1,943 2,122 2,274
FULLERTON CARAN PRECISION ENGINEERING 556 0.6203 1,439 1,420 955 1,384 1,477 11693 1,691
FULLERTON SANTANA SERVICES 15 0.4538 34 895 389 642 686 740 786
FULLERTON OR SMOOTHIE ENTERPRISES - 0.0416 67 87 58 83 a9 96 102
FULLERTON FULLERTON PLATING 388 0.2750 85 81 142 216 235 259 270
GARDEN GROVE HOUSE FOCOS AMERICA CORPORATION - 76.7310 1,019,071 367,946 369,484 472,744 602,114 539.043 570,012
GARDEN GROVE U.S.DYEING&FINISHING INC. Bea 208.0300 380,501 100,667 209,560 289,640 311,835 339,355 362,717
GARDEN GROVE PILKINGTCN AEROSPACE 2,381 19.1630 6,843 42,052 10,643 30,065 32,076 34,548 36,062
GARDEN GROVE LINFINITY MICROELECTRONICS INC. 3,241 27.3190 11096 5,787 11,721 16,465 20,234 22,400 24,220
GARDEN GROVE IDEAL UNIFORM RENTAL SERVICE - 7.7470 14,380 25,030 12,402 18,740 10,910 21,360 22,602
GARDEN GROVE GOODWIN COMPANY 142 1.7550 27,415 2,157 7,070 0,328 0,261 10,780 11,441
GARDEN GROVE CATALINA CYLINDERS A DIV.OF APP 636 6.7468 5,669 4,995 5,092 7,505 6,102 8,639 9,454
GARDEN GROVE AIR INDUSTRIES CORP.-KNOTT 11856 3.9312 0,107 8,107 5,441 7,864 8,413 0,070 0,630
GARDEN GROVE COASTLINE METAL FINISHING CORP. 230 5.9377 1,357 2,283 3,070 4,741 5,164 5,683 6,121
GARDEN GROVE ELECTRON PLATING III INC. 131 5.1320 409 1,001 2,247 3,604 3,640 4,261 4,698
GARDEN GROVE BAZZ HOUSTON CO. 343 3.0850 2,926 1,604 2,2/6 3,185 3,449 3,774 4,050
GARDEN GROVE CANNON EQUIPMENT WEST INC. 437 1.2770 1,263 1,887 1,406 21048 2,193 2,373 2,527
GARDEN GROVE LACEY CUSTOM LINENS 40 1.1490 1,216 3,270 1,508 2,351 2,601 2,688 2,844
GARDEN GROVE AIR INDUSTRIES CORP.(CHAPMAN) 508 0.5370 1,386 1,025 804 1,139 1,216 1,311 1,392
GARDEN GROVE D a S CUSTOM PLATING INC. 42 0.8982 407 460 642 819 888 074 1,046
GARDEN GROVE CD VIDEO INC - 0.6873 440 440 460 687 743 812 870
GARDEN GROVE BASIC ELECTRONICS,INC. 201 0.2176 833 308 301 470 512 554 500
GARDEN GROVE STAR POWDER COATING 9 0.0306 106 30 45 69 63 69 73
GARDEN GROVE MIRACLE STRIPPING&PLATING,INC - 0.0220 48 45 30 44 47 61 64
GARDEN GROVE GRAPHIC PACKAGING CORP. 2,043 0.0569 1,995 1,925 1,325 1,921 2,050 2,210 2,346
HUNTINGTON BEACH BOEING COMPANY(GENERAL FAC) 6,970 55.9220 04,640 102,113 09,944 137,487 146.076 166,484 105,492
H:ldept111n12101STREMExcenPermlt Users\2002-03 recan and rates Oct 2004.01
9/29/2004 Page 7 of 13
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actual Dlscharpes
Estimated
OCSD 80% 2002-03 2002-03 2002-03
Share of Total Total Total 2004.05 2004-05 2005-06 2006-07 2007-08
City Permit User Name Property Flow 800 SS Adopted Proposed Estimated Estimated Estimated
Taut (MG) Qbs) 4bs)
Flew Rate per Mlilien Gallons $ 380.58 $ 677.30 S 637.55 $ 711.27 S 773.32
800 Rate per 1000 Pounds $ 248.65 S 270.68 S 208.50 $ 311.21 $ 330.53
SS Rate per 1000 Pounds $ 238.46 $ 414.27 $ 432.14 $ 454.19 S 473.60
HUNTINGTON BEACH JOHN A.THOMAS 11.6342 71,025 6,210 23,422 20,514 30,592 33,199 35,413
HUNTINGTON BEACH COLUMBIA HUNTINGTON BEACH HOSPITAL 908 10.6716 22,042 22,042 14,431 21,200 22,624 24,390 25,807
HUNTINGTON BEACH NUEVO ENERGY CO(HB) 103 11.4379 14,600 20,324 12,741 10,029 20,345 21,072 23,361
HUNTINGTON BEACH CAL-AURUM INDUSTRIES INC. 220 13.0295 626 944 5,163 8,082 0,895 9,891 10,730
HUNTINGTON BEACH BRINDLEITHOMAS OIL COMPANY 59 2A900 19,342 639 6,707 6,765 7,263 7,888 8,389
HUNTINGTON BEACH CAMBRO MANUFACTURING 934 3.5750 7,454 7,464 4,948 7,169 7,651 0,248 0,768
HUNTINGTON BEACH PRECISION RESOURCE,CALIF DIV 626 3.8066 5,881 4,051 3,032 5,469 5,876 6,379 8,807
HUNTINGTON BEACH SPEEDY CIRCUITS,FACILITY#2 120 4.7120 4,137 1,203 3,073 4,375 4,756 5,220 5,623
HUNTINGTON BEACH GARO-OIL PRODUCTION LLC 130 3.4073 - - 1,260 2,010 2,230 2,488 2,705
HUNTINGTON BEACH TIODIZE COMPANY,INC. 96 3.0931 488 655 1,417 2,169 2,396 2,649 2,663
HUNTINGTON BEACH CITY OF HUNTINGTON BEACH FIRE DEPARTMENT - 2.5012 1,064 709 1,365 2,020 2,208 2,432 2,S22
HUNTINGTON BEACH BOEING COMPANY(GRAHAM) - 1.1200 2,335 2,335 1,650 2,246 2,397 2,584 2,744
HUNTINGTON BEACH CAPRO OIL COMPANY 22 1.9162 - 706 1,106 1,221 1,362 1,481
HUNTINGTON BEACH SOUTH COAST OIL CORPORATION 182 1.7892 - - 659 1,033 1,141 1,273 1,384
HUNTINGTON BEACH HB OIL OPERATIONS TRUST 22 1.0460 1,137 744 847 1,222 1,318 1,438 1,539
HUNTINGTON BEACH SOLDERMASK,INC. 132 0.3164 1,140 942 05 883 039 1,009 11060
HUNTINGTON BEACH CEMPI INDUSTRIES INC. 176 0.6315 560 660 460 691 743 807 an
HUNTINGTON BEACH LOCI GRAPHICS,INC. 144 0.7109 306 107 378 502 014 677 730
HUNTINGTON BEACH MILLETT INDUSTRIES - 0.3409 am 596 418 007 649 701 746
HUNTINGTON BEACH M.S.BELLOWS 62 OA465 1,118 267 393 403 527 see 604
HUNTINGTON BEACH ROCK INDUSTRIES,INC. 97 0.3820 347 308 301 442 477 520 556
HUNTINGTON BEACH SPEEDY CIRCUITS,DIV OF PJC 0.2320 484 484 321 465 496 535 560
HUNTINGTON BEACH PIER CIL COMPANY 35 0.5550 - - 205 320 354 345 429
HUNTINGTON BEACH PETROPRIZE 7 0.2077 108 166 103 205 222
HUNTINGTON BEACH BRINDLEITHOMAS 0.1460 64 84 93 104 113
HUNTINGTON BEACH SIGNAL ASSOCIATES 3 0.0083 25 39 44 49 53
HUNTINGTON BEACH SOUTH COAST OIL COMPANY - 0 0 0 0 0
HUNTINGTON BEACH ALEXANDER OIL COMPANY 3 0 0 0 0 0
HUNTINGTON BEACH W.M.ELLIOTT 7 - 0 0 0 0 0
HUNTINGTON BEACH WILVIAN JEWELL RENNER 17 0.0029 1 2 2 2 2
HUNTINGTON BEACH WILLIAM J.SCOTT 28 0 0 0 0 0
HUNTINGTON BEACH O'DONNELL CIL COMPANY 65 0.0091 19 19 13 18 19 21 22
HUNTINGTON BEACH S d C OIL CORPORATION 108 - - - 0 0 0 0 0
IRVINE ROYALTY CARPET MILLS INC. 166 173.3180 752,704 105,273 270,008 347.410 373,147 405,330 432,668
IRVINE B.BRAUN MEDICAL INC. 16,072 237.2620 60,889 43,220 110,353 100,594 184,564 204,152 220,694
IRVINE MARUCHAN,INC. 890 14.6254 137,997 20,673 ",619 54,360 58,070 62,736 66,711
IRVINE TODDS ENTERPRISES 424 7.7908 120,768 53,243 45,589 59,249 62,822 67,314 71,159
IRVINE PACKARD-HUGHES INTERCONNECT SYSTEMS 094 30.2168 11,619 0,427 19,691 29,691 32,429 35,792 383832
H:lde;Mfln12101STREED1Ezcel~Permit Usersti2002-03 recan and rates Oct 2004.xla
9/29/2004 Page 8 of 13
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actual Discherges
Estimated
OCSD eO% 2002-03 2002-03 2002-03
Shore of Total Total Total 2004-05 2004-05 2005-06 20W07 2007-08
City Permft User Name Property Flow 800 SS Adopted Proposed Estimated Estimated Estimated
Tax (MG) pbs) (Ibs)
Flow Rate per MII!len Gallons $ 368.50 $ 577.30 S 637.66 S 711.27 S 773.32
800 Rate per 1000 Pounds $ 248.65 $ 270.68 $ 268.60 $ 311.21 S 330.53
SS Rate per 1000 Pounds $ 238.45 $ 414.27 $ 432.14 $ 454.10 $ 473.60
IRVINE E13WARD LIFESCIENCES LLC 2,810 26.0706 25,842 25,842 22,194 32,751 35,244 38,323 40,039
IRVINE UNION INCORPORATED - 16.6178 64,008 11,849 22,006 28,644 30,650 33,228 36,539
IRVINE PRUDENTIAL OVERALL SUPPLY 216 0.0088 18,583 12,621 9,346 13,188 14,069 15,167 10,104
IRVINE JEFFERSON SMURFIT CORPORATION(U.S.) 2,349 4.9820 18,334 9,469 8,644 11,750 12,545 13,536 14,301
IRVINE RAYNE DEALERSHIP CORP - 12.3764 e11 3,376 5,519 8,709 9,628 10,627 11,372
IRVINE ENTHONE INC. 211 2.0340 23,113 1,707 0,023 8,176 5,741 91466 10,063
IRVINE ELECTROLURGY INC. 07 9.4495 1,084 5,106 4,970 7,884 6,544 9,370• 10,003
IRVINE SUNSET ENVIRONMENTAL,INC.#2 154 1.8145 0,75e 13,683 5,611 8,545 9,019 9,008 10,115
IRVINE COSMOTRONIC CORP 2e 3.1836 6,851 1,718 3,288 4,404 4,749 5,177 5,640
IRVINE RICOH ELECTRONICS INC. 11e 3.9096 3,026 2,961 2,900 4,303 4,646 5,060 5,426
IRVINE PRINTRONIX,INC. 1,184 1.8325 3,375 3,375 2,319 31369 3,800 3,866 4,130
IRVINE NEWPORT CORPORATION 1,303 1.6967 3,636 3,530 2,347 33401 3,630 3,913 4,155
IRVINE 0 C B REPROGRAPHICS 106 1.6626 3,258 3,260 2,162 3,133 3,344 3,805 3,828
IRVINE FMH INVESTOR GROUP 370 1.4464 1,593 1,467 1,270 1,874 2,016 2,191 2,340
IRVINE NEWPORT PRECISION OPTICS 0.6627 1,162 1,233 827 1,208 11290 1,393 1,480
IRVINE SUNSET ENVIRONMENTAL,INC.#1 246 0.6850 1,220 1,220 810 1,173 1,262 11350 1,433
IRVINE ALLTEK CIRCUIT INC. - 0.9059 284 94 427 639 700 776 539
IRVINE DYE TECHNIQUE INC. 28 0.1348 281 281 187 270 288 311 330
IRVINE WINTEC,LLC 0.0981 168 1e2 117 170 182 lea 200
LA HABRA RALPHS GROCERY COMPANY(BAKERY) 2,716 6.6379 01,387 17,621 29,339 35,827 38,169 41,120 43,036
LA HABRA SHEPARD BROTHERS INC. 310 0.3155 21,084 932 5,803 8,619 6,940 7,490 7,962
LA HABRA WATER MAN 9 5.6179 190 190 2,163 3,373 3,718 4,141 4,497
LA HA13RA ARNOLD ELECTRONICS,INC.#1 22 4.1023 474 733 1,805 2,800 3,069 3,398 3,676
LA HABRA LA HABRA PLATING CO.INC. 15 2.1230 08 e8 815 1,272 1,402 1,562 1,8g8
LAPALMA LA PALMA INTERCOMMUNITY HOSPITAL 1,095 12.3087 26,664 26,664 17,035 24,684 26,342 20,308 30,153
LA PALMA PERFORMANCE MACHINE INC 1.1621 2,423 2,423 1,808 2,330 2,487 21081 2,847
LOS ALAMITOS JOINT FORCES TRAINING BASE,LOS ALAMITOS - 25.6853 30X65 33,605 25,223 37,240 39,958 43,300 46,160
LOS ALAMITOS LOS ALAMITOS GENERAL HOSPITAL 3,871 12.3191 25,885 25,665 17,049 24,705 26,304 28,422 30,170
LOS ALAMITOS TREND OFFSET PRINTING SERVICES INC. - 8.6231 17,070 17,979 11,934 17,293 18,464 19,895 21,124
LOS ALAMITOS ARROWHEAD PRODUCTS CORPORATION 2,082 10.2132 9,669 9,430 0,416 12,420 13,376 14,655 16,550
LOS ALAMITOS HEARING INSPECTION INC. 94b 0.8458 1,754 1,738 1,164 1,685 1,768 1,939 2,059
NEWPORT BEACH JAZZ SEMICONDUCTOR 43,092 267.5677 12,271 12,271 100,207 157,093 173.00 192,566 209,041
NEWPORT BEACH HOAG MEMORIAL HOSPITAL PRESBYTERIAN - 35.9830 75,020 75,02e 49,800 72,162 77,008 63,019 68,160
NEWPORT BEACH HIXSON METAL FINISHING 41 15.7516 894 2,684 6,888 10,447 11,400 12,701 13,747
NEWPORT BEACH RENAL RESEARCH INSTITUTE,LLC - 2.2454 4,M 4,682 31108 4,603 4,605 5,180 5,601
NEWPORT BEACH AMETEK AEROSPACE 202 2.4275 3,124 3,057 2,400 3,513 3,770 4,087 4,357
NEWPORT BEACH CITY OF NEWPORT BEACH - 2.2182 1,604 1,694 1,643 2,441 2,635 2,874 3,077
NEWPORT BEACH BASIN MARINE INC. 18 0.3406 306 251 264 387 418 450 488
H;ldeptfln\2101STREEDIExcel9ermit UserM2002-03 recon and rates Oct 2004.xls
9/29/2004 Pape 9&13
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actual Dlscheiges
Estimated
OCSO 60% 2002-03 2002-03 2002-03
City Permft User Name Shera of Total Total Tote) 2004-05 2004.05 2005-00 20W07 2007-08
Property Flow BCD SS Adopted Proposed Estimated Estimated Estimated
Tax (MG) tabs) Cbs)
Flow Rate per MEllion Gallons S 368.58 S 577.30 $ 637.65 $ 711.27 $ 773.32
800 Rate per 1000 Pounds S 248.55 E 270.08 $ 280.60 $ 311.21 $ 330.63
SS Rate per 1000 Pounds $ 238.45 $ 414.27 $ 432.14 S 454.19 S 473.50
ORANGE UCI MEDICAL CENTER - 63.2390 131,853 131,853 87,521 126,821 135,337 145,001 154,018
ORANGE ANGELICATEXTILE 268 69.9501 66,774 60,148 681816 100,063 108,086 117,901 126,392
ORANGE ST.JOSEPH HOSPITAL 210 52.9765 110,456 110,456 73,310 108,240 113,374 122,224 120,778
ORANGE GRANDE TCRTI LLA INC. 205 3.2605 137,285 69,118 51,805 67,676 71A54 76,434 80,626
ORANGE CHILDREN'S HOSPITAL OF ORANGE COUNTY - 12.8865 26,410 20,410 17,630 25,402 27,107 29,223 31,020
ORANGE MARCEL ELECTRONICS INT. 162 21.8946 10,008 7,439 12,346 18,446 20,078 22,085 23,781
ORANGE WASTE MANAGEMENT OF CC TRANSFER 393 3.2326 39,024 6,642 12,212 14,726 15,714 16,901 18,022
ORANGE CHAPMAN MEDICAL CENTER 1,253 7.1454 14,898 14,898 0,889 14,330 15,292 16,485 17,504
ORANGE CIRTECH INC. 160 6.7337 0,197 7,940 6,663 9,670 10,381 11,262 12,011
ORANGE WEST AMERICAN RUBBER COMPANY INC. 1,163 7.0405 6,686 6,666 5,850 8,643 0,300 10,124 10,819
ORANGE SIERRA SPRING WATER COMPANY 88 7.9708 2,471 1,228 3,844 5,778 0,325 e,995 7,661
ORANGE STATEK CORPORATION 290 4.6971 7,773 4,278 4,603 61588 7,088 7,703 8,227
ORANGE CONTINUOUS COATING CORPORATION 402 5.910o 1,135 2,030 2,944 4,560 4,973 5,479 5,907
ORANGE SVG THERMCO SYSTEMS INC. 683 2.7000 6,630 5,e30 3,737 6,416 5,778 6,229 0,614
ORANGE PLATECORP#2,INC. 176 5.4129 1,725 1,269 2,720 4,118 4,497 4,663 5,357
ORANGE ULTRA PURE METAL FINISHING,INC. 118 4.8517 363 4,108 2,850 4,601 4,973 5,430 5,817
ORANGE ORANGE COUNTY PLATING CO.,INC. 18 4.8133 962 1,294 2,322 3,675 3,905 4,311 4,663
ORANGE CIRCUITACCESS 65 1.0015 10,118 730 3,060 3,e20 3,073 4,193 4,465
ORANGE VILLA PARK ORCHARDS ASSOCIATION 474 1.8421 3,634 5,808 3,012 4,532 4,815 51166 6,460
ORANGE DUCOMMUNAEROSTRUCTURES 2,083 2.2010 4,546 1,936 2,680 3,707 3,607 4,367 4,882
ORANGE SOUTH COAST WATER 299 2.8263 211 3,438 1,014 3,113 3,349 3,638 3,684
ORANGE FOAMEX L.P. - 1.5114 3,030 3,056 2,039 2,059 3,168 3,406 3,617
ORANGE CADILLAC PLATING 137 2.4991 376 1,052 1,206 1,280 2,158 2,372 2,555
ORANGE HIGHTOWER PLATING 6 MANUFACTURING CO. 473 2.5353 117 1,265 1,203 2,015 2,192 2,410 2,693
ORANGE HAMILTON MATERIALS 112 1.1900 2,481 2,481 1,647 2,386 2,647 2,745 2,016
ORANGE DUNHAM METAL PROCESSING 19 1.6832 644 2,924 1,445 2,310 2,401 2,680 2,851
ORANGE QUALITY ALUMINUM FORGE 02 77 1.1122 1,079 1,640 1,270 1,833 1,963 2,124 2,261
ORANGE SERRANO WATER DISTRICT 0.7051 26 6,217 1,543 2,627 2,769 2,943 3,094
ORANGE THERMAL-VAC TECHNCLCGY - 1.2226 60 1,424 805 1,312 1,412 1,636 1,839
ORANGE QUALITY ALUMINUM FORGE 175 0.9273 477 582 509 808 980 1,072 1,150
ORANGE S F P P,L.P. 32 0.3604 2,042 288 712 854 948 1,027 1,095
ORANGE DITTY DRUM COMPANY,INC. 27 0.9733 338 338 523 793 884 051 1,024
ORANGE CIRCUIT TECH INC. 116 0.3761 646 215 350 481 619 660 808
ORANGE INDEPENDENT FORGE 175 0.3297 520 639 370 555 693 641 682
ORANGE ABADESURRING AND TUMBLING - 0.2660 640 343 310 444 470 file 660
ORANGE PERFORMANCE POWDER,INC. 0.3066 323 299 265 390 419 450 487
ORANGE BURLINGTON ENGINEERING INC. 61 0.2627 293 293 239 352 370 411 438
ORANGE GOMTECH ELECTRONICS 27 0.1466 57 67 81 123 134 147 150
H:adeptl11nW MOTREEMExcenPermit Users12002-03 recon and rates Oct 2004.xis
9129/2004 Page 10 of 13
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actual Discharges
Esdmated
CCSD 60% 2002-03 2002-03 2002-03
City Permit User Name Share of Total Total Total 2004-05 2004-05 2005-06 20W07 2007-08
Property Flow BOD SS Adopted Proposed Estimated Estimated Estimated
Tax (MG) Qbs) Qbs)
Flaw Rate per Mllilon Gallons $ 368.50 $ 577.30 $ 637.56 $ 711.27 S 773.32
800 Rate per I M Pounds $ 248.65 S 270.68 $ 280.60 $ 311.21 S 330.63
SS Rate per 1000 Pounds $ 238.45 $ 414.27 S 432.14 $ 454.19 S 473.50
ORANGE DATA AIRE INC.#2 923 0.4202 856 734 543 778 832 899 958
PLACENTIA KNOTTS BERRY FARM FOODS 2,041 16.5556 871,488 53,200 235.396 267,491 294,009 307,154 326,046
PLACENTIA PLACENTIA LINDA COMMUNITY HOSPITAL 2,855 13.3404 27,815 27,816 18,463 26,763 26,650 30,778 32,680
PLACENTIA FROZSUN FOODS,INC. 163 7.4577 28,384 6,618 11,382 14,730 15,803 17,144 18,283
PLACENTIA S.B.THOMAS INC. 742 1.7687 19,044 4,113 6,386 7,880 5,309 0,053 9,610
PLACENTIA CALIF CONSOLIDATED WATER PURIFICATION 246 3.6176 303 12,679 4,668 7,637 6,104 8,878 0,170
PLACENTIA EXCELLO CIRCUITS MANUFACTURING CORP. 153 5.4606 31083 1,264 3,085 4,616 4,925 6,427 6,861
PLACENTIA CARTEL ELECTRONICS - 3.6020 3,095 868 2,309 3,285 3,573 3,928 4,220
PLACENTIA HARTWELL CORPORATION 466 1.3611 2,422 1,092 1,679 2,266 2,427 2,626 2,798
PLACENTIA K C A ELECTRONICS,INC. 510 1.8194 1,491 567 1,248 1,013 1,666 2,162 2,310
PLACENTIA NOLLAC OIL COMPANY 12 1.9307 259 772 980 11505 11839 1,605 1,944
PLACENTIA GEORGEA.JONES,IMPERIAL42 WELL 29 1.5483 314 314 723 1,108 1,212 1,340 1,448
PLACENTIA BRIGHT ARMOUR PLATING 78 1.3014 165 287 689 915 1,002 1,10a 1,197
PLACENTIA SUPERIOR PROCESSING 128 0.5574 132 111 265 404 441 4a8 627
SANTA ANA STREMICKS HERITAGE FOODS LLC 3,535 88,9928 2,109,695 743,727 734,507 830,531 986,778 1,057,649 1,118,292
SANTA ANA CHROMA SYSTEMS PARTNERS 1,252 167.2663 268,230 43,329 138,652 187,117 202,749 222,127 238,525
SANTAANA IRWODA76 - 207.7076 6,236 1,770 76,280 122,060 134,699 160,169 163,103
SANTA ANA UWMC HOSPITAL CORPORATION 8,030 37.7209 78,60 70,648 62,205 76,640 60,726 07,027 92,406
SANTA ANA EL METATE FOODS,INC. 317 3.8308 101,644 51,273 38,901 50,965 53,923 57,645 60,836
SANTAANA GOGLANIAN BAKERIES 790 0.0730 71,164 63,166 $6,725 50,091 52,074 56,578 69,674
SANTA ANA EL TORO MEAT SHOP 128 4.1564 86,921 24,970 29,093 36,276 38,621 41,353 43,772
SANTAANA GEMINI INDUSTRIES INC. 97 5.6713 853 133,608 34,161 58,856 61,599 64,903 67,931
SANTAANA MICRO SEMI CORP. 1,692 30.4213 18,864 11,731 10,109 26,984 20,327 32,211 34,651
SANTAANA DANONE WATERS OF N.A-SANTA ANA - 35.6826 4,219 8,009 16,073 25,001 27,364 30,259 32,703
SANTAANA ORANGE COUNTY REGISTER 0,584 16.1072 36,280 32,482 22,451 32,305 34,484 37,189 39,497
SANTA ANA ITT CANNON,A DIVISION OF ITT INDUSTRIES 14,959 31.0324 16,173 13,862 10,612 27,760 30,140 33,086 35,572
SANTAANA TTMTECHNOL0131ES#1 162 17.7699 21,094 11,125 14,453 20,569 22,235 24,271 25,097
SANTAANA CULLIGAN WATER CONDITIONING - 16.4408 360 6,24a 7,641 12,170 13,288 14,645 15,794
SANTA ANA MEDTRONIC HEART VALVES,INC. 627 7A975 16,359 10,107 0,143 12,745 13,702 14,828 15,707
SANTA ANA INTERNATIONAL FOOD SOLUTIONS,INC 712 2.8088 31,450 4,163 %542 11,665 12,659 13,671 14,534
SANTAANA UNIVERSAL CIRCUITS INCORPORATED 647 14.0630 2,053 4,902 6,539 10,664 11,633 12,823 13,828
SANTAANA ASTECH ENGINEERED PRODUCTS 118 13.9800 2,449 2,124 6,271 0,610 10,643 11,677 12,633
SANTA ANA EMBEE INC.42 25 13,4831 2,390 31600 6,424 9,924 10,843 11,071 12,923
SANTAANA BURROWS IND.DBA MINUTEMAN PUMPING 177 2.7786 24,011 4,613 0,092 10,014 10,692 11,644 12,259
SANTAANA PIONEER CIRCUITS 315 9.7055 6,649 4,063 6,204 6,106 9,586 10,848 11,665
SANTAANA ALPHANETICS INC. 102 0.3160 4,891 1,677 6,040 7,397 8,076 6,910 9,816
SANTA ANA MARKLAND MANUFACTURING,INC. 407 0.0452 3,370 2,977 4,881 7,387 8,026 8,835 0,518
SANTA ANA TTM TECHNOLOGIES,INC 642 6.6746 6,207 6,337 5,588 81274 8,912 9,680 10,306
H:ldeptffn1210\STREED\Excel\Permlt UseW2002-03 recon and rates Oct 2004.xis
9/29/2004 Page 11 of 13
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actual Discharges
Estimated
OCSD 60% 2002-03 2002-03 2002-03
City Permit User Name Share of Taal Total Total 2004-05 2004-05 2005-08 2006-07 2007-06
Property Flaw BCD SS Adopted Proposed Estimated Estimated Estimated
Tax (MG) Qbs) pbs)
Flog Rate per Million Gallons S 368.58 S 57710 S 637.65 $ 711.27 S 773.32
BCD Rote per 1000 Pounds $ 248.55 $ 270.66 $ 260.50 $ 311.21 $ 330.53
SS Rate per 1000 Pounds S 238.45 $ 414.27 $ 432.14 S 454.19 $ 473.50
SANTA ANA FABRICATION CONCEPTS CORPORATION 776 5.5601 5,655 8,054 5,379 0,082 8,663 9,379 0,269
SANTA ANA EMBEE INC.#1 30 7.0546 626 1,698 3,164 4,951 6,41a 5,991 6,474
SANTA ANA TEXTRON AEROSPACE 4,539 7.0782 6,073 5,683 5,400 7,989 8,620 9,398 10,058
SANTA ANA ANOMIL ENT.DBA DANCO METAL SURFACING 150 6.4452 2,679 3,417 3,488 5,284 5,721 6,250 6,714
SANTA ANA ANODYNE INC. 24 6.6640 646 4,441 3,307 5,284 6,716 6,246 6,696
SANTA ANA EMBEE INC.#3 30 6.0761 1,012 1,327 2,066 4,493 4,912 5,426 SA69
SANTA ANA ALUMINUM FORGE-DIV.OF ALUM.PRECISION 164 2.2268 2,011 10,307 3,779 6,101 6,466 6,693 7,269
SANTA ANA WEBER PRECISION GRAPHICS 162 1.0217 9,209 1,161 2,940 3,560 3,806 4,116 4,379
SANTA ANA CHROME TECHNOLOGY,INC. 217 3.8819 1,276 2,027 2,231 3,426 3,719 4,079 4,384
SANTA ANA SOUTH COAST CIRCUITS#3 63 3.6930 2,084 1,369 2,169 3,205 3,403 %826 4,116
SANTA ANA RICOH ELECTRONICS#2 785 1.7601 4,412 4,085 2,710 31897 4,164 4,473 4,746
SANTAANA ALUMINUM PRECISION PRCDUCTS INC.CENTRAL - 1.5766 5,120 1,955 2,320 3,106 3,327 3,603 3,837
SANTA ANA DATA ELECTRONIC SERVICES INC. 75 3.1141 1,632 1,021 1,797 2,663 2,690 3,187 3,431
SANTA ANA ACTIVE PLATING INC. 3.2736 1,103 796 1,686 2,535 2,767 3,052 3,293
SANTA ANA INTEGRATED AEROSPACE,INC. - 1.551 a 3,274 3,108 2,127 3,069 3,276 3,534 3,753
SANTA ANA GALLADE CHEMICAL INC. 170 1.980 2,303 11860 1,762 2,546 2,742 2,9a2 3,186
SANTA ANA ACCURATE CIRCUIT ENGINEERING 63 1.3762 4,283 1,027 1,616 2,370 2,666 2,778 2,065
SANTA ANA ALUMINUM PRECISION PRCDUCTS INC.-SUSAN 124 1.7643 2,144 2,116 11696 2,487 2,070 2,697 31090
SANTA ANA VERTEQ PROCESS SYSTEMS INC. - 2.1927 1,271 1,271 1,427 2,130 2,314 2,532 2,717
SANTA ANA REID METAL FINISHING 134 1.9402 939 910 1,168 1,762 1,901 2,088 2,242
SANTA ANA R B C TRANSPORT DYNAMICS CORP. 290 1.0326 2,122 2,142 1,419 2,058 2,196 2,360 2,614
SANTA ANA SOUTH COAST CIRCUITS 44 72 2.2302 431 265 990 1,610 1,657 11839 1,988
SANTA ANA ELECTROSERVICES 2000 INC. 174 2.1012 641 73 $51 1,417 1,556 1,727 1,871
SANTA ANA ALMATRON ELECTRONICS,INC. 107 1.7311 1,048 664 1,054 1,664 1,688 1,864 1,996
SANTA ANA BRASSTECH,INC - 0.0141 1,006 1,608 1,265 1,833 1,958 2,109 2,239
SANTA ANA SOUTH COAST CIRCUITS#2 - 1.2736 2,019 297 1,042 1,405 1,523 11689 1,793
SANTA ANA PLEI ON CORPCRATI ON#2 706 1.0439 1,319 1,440 1,058 1,560 1,672 1,811 1,929
SANTA ANA L d N UNIFORM SUPPLY COMPANY,INO.(CLEAN) - 0.7479 1,753 1,781 1,136 1,644 1,752 1,886 2,001
SANTA ANA WHEEL SERVICES GROUP,INC - 1.6010 219 773 a22 1,223 1,408 1,644 1,682
SANTA ANA SOUTH COAST CIRCUITS,INC. 79 1.5479 459 493 802 1,222 11333 1,468 1,582
SANTA ANA PACIFIC QUARTZ,INC. 88 0.8409 1,400 1,389 092 1,446 1,546 1,671 1,778
SANTA ANA SOUTH BAY CHROME SALESICHROME EFFECTS 126 1.4043 476 700 803 1,220 1,336 1,485 1,576
SANTA ANA ORANGE CONTAINER,INC. - 0.6319 1,338 1,769 994 1,472 1,68a 11663 1,782
SANTA ANA MASK TECHNOLOGY INC. 126 0.9016 611 397 012 am 980 1,076 1,167
SANTA ANA SELECT CIRCUITS 275 0.7603 1,260 190 649 675 948 11039 1,116
SANTA ANA S P S TECHNOLOGIES 2,954 3.9208 3,404 3,404 3,103 4,695 4,653 6,394 %769
SANTA ANA E F T FAST QUALITY SERVICE,INC. 88 0.9660 122 357 471 738 605 sa7 956
SANTA ANA SANTA ANA PLATING(CNK CAPITAL) 44 0.3965 827 027 640 795 849 915 071
H:ldepttln\210tSTREEMExcel9ermit Users12002-03 recon and rates Oct 2004.xis
9/29/2004 Page 12 of 13
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actusl Dh3cherges
Estimated
OCSO 80% 2002-03 2002-03 2002-03
City Permit User Name Share d Total Total Total 2004-06 2004-05 2006-08 20W07 2007-08
Property Flow SOD SS Adopted Proposed Estimated Estimated Estimated
Tex (MG) Qbs) Qbs)
Flow Rate per Mllllcn Gallons $ 360.50 $ 677.30 S 537.56 S 711.27 S 773.32
800 Rate per 1000 Pounds $ 246.55 $ 270.60 $ 200.60 S 311.21 $ 330.63
SS Rate per 1000 Pounds S 238.45 $ 414.27 S 432.14 $ 454.10 $ 473.60
SANTA ANA CAL-TRONICS CIRCUIT INC.-SANTA ANA 0.0315 546 272 433 625 678 743 798
SANTAANA LAM-PLATE TECH INC. 118 0.7248 327 129 379 560 612 678 730
SANTAANA OLYMPIC POWDER COATINGS INC. 108 0.5203 657 516 463 665 716 778 831
SANTAANA GORILLAS POLISHING AND PLATING 150 0.6832 368 102 389 574 625 688 741
SANTA ANA MARGARETIS TEXTILE SERVICE 233 0.3642 765 765 601 725 775 836 887
SANTA ANA MARK OPTICS INC. 66 0.4100 305 880 469 708 760 814 884
SANTA ANA B A F INDUSTRIES 231 0.4161 640 472 425 808 663 700 766
SANTA ANA PRECIOUS METALS PLATING 93 0.6052 243 204 332 Soo 544 590 645
SANTAANA STRIP CLEAN COMPANY 14 0.6007 184 240 328 601 545 800 646
SANTA ANA PRECISION CIRCUITS WEST INC. - 0.4882 388 303 348 512 554 605 649
SANTA ANA AQUA-CON COMPANY 50 0.6081 149 203 310 470 518 571 616
SANTA ANA ALLOY TECH ELECTROPOLISHING INC. 152 0.4538 232 146 260 385 419 401 407
SANTA ANA MEDEVA PHARMACEUTICALS CA,INC. 131 0.1921 401 401 266 385 411 443 471
SANTAANA VICTORY CIRCUITS INC. - 0.1476 561 65 204 257 277 301 322
SANTA ANA X Z X ELECTRONICS 97 0.1524 324 88 168 212 228 249 266
SANTAANA AUTO-CHLOR SYSTEM OF WASHINGTON,INC. 62 0.0646 483 121 169 212 220 244 250
SANTAANA AQK DEBURRING AND TUMBLING 0.1006 235 189 141 200 214 231 245
SANTAANA DATA SOLDER INC 0.0046 136 135 90 130 139 150 169
SANTAANA HI-TECH STENCILS - 0.0272 53 61 35 51 65 69 63
SANTAANA LAM LIGHTING INC. 2,040 0.6660 1,339 1,394 911 1,324 1,413 1,624 1,e18
SANTAANA PRECISION POWDERCOATING INC, 136 0.1693 143 84 114 166 179 196 210
SEAL BEACH NAVAL WEAPONS STN SEAL BCH CD 043 - 5.2734 10,095 10,995 7,298 10,576 11,280 12,160 12,918
SEAL BEACH ACCURATE METAL FABRICATORS - 2.5550 5,327 5,327 3,638 5,124 6,468 5,805 6,259
STANTON ALL METALS PROCESSING OF O.C.INC. 200 2.9329 2,273 2,239 2,180 3,236 3,493 3,810 4,080
STANTON PURE-CHEM PRODUCTS COMPANY INC. 70 0.1891 317 360 234 344 368 307 422
TUSTIN CITY OF TUSTIN WATER SERVICE(17TH ST.) 96.3091 19 2,428 36,081 6e,e10 62,457 69,611 753SU
TUSTIN CITY OF TUSTIN,WATER SERVICE(MAIN ST.) 19.2910 682 1,466 7,625 11,923 13,124 14,693 15,831
TUSTIN TUSTIN HOSPITAL AND MEDICAL CENTER 5.9627 12,432 12,432 8,252 11,955 12,761 13,767 14,607
TUSTIN CITY OF TUSTIN-MAINTENANCE YARD 0.4317 665 873 582 845 202 073 1,033
TUSTIN TOYOTA RACING DEVELOPMENT 02 242 0.4080 798 741 520 759 811 876 931
TUSTIN CHEEK ENGINEERING 8 STAMPING 244 0.3671 442 261 307 439 474 617 553
TUSTIN WESCO SERVICES - 0.0722 293 43 110 139 149 162 173
TUSTIN REVERE TRANSDUCERS,INC. 1,164 1.2217 1,202 1,152 1,024 1,6% 1,024 1,760 11888
WESTMINSTER VENCOR INC OBA VENCOR HOSP-ORANGE COUNTY 1,284 5.8993 12,300 12,300 8,164 11,831 12,625 13,610 14,462
WESTMINSTER LINDBERG HEAT TREATING CO.-ALUMATHERM 708 4.0551 1,408 1,408 2,160 3,305 3,600 3,962 4,268
WESTMINSTER SOUTHERN CALIFORNIA EDISON - 1.3620 2,114 2,099 1,628 2,220 2,306 2,680 2,746
YORBA LINDA AERA ENERGY LLC 204 440.4840 62,594 29,538 184,054 283,470 311,653 346,198 375.31 a
YORBA LINDA METRO WATER DISTRICT OF SO CA - 2.0152 3,996 4,000 2,690 3,002 4,166 4,403 4,773
H:\dept1Rn121 GNSTREED\ExcellPermit User8L2002-03 recon and rates Oct 2004.xis
9/29/2004 Page 13 of 13
Estimated Impact on PermR Users to 2007-08
Based Upon 2002-03 Actual Discharges
Estimated
OCSD 60% 2002-03 2002-03 2002-03
City Permit User Name Share of Total Total Total 2004-05 2004-05 2005-06 2006-07 2007-08
Property Flow 800 66 Adopted Proposed Estimated Estimated Estimated
Tax (MG) Qbs) Qbs)
Flow Rate per Million Gallons S 368.58 S 577.30 S 637.66 S 711.27 S 773.32
BOD Rate per 1000 Pounds $ 248.55 S 270.68 $ 288.60 $ 311.21 $ 330.63
SS Rate per 1000 Pounds $ 230.45 S 414.27 $ 432.14 $ 454.19 $ 473.60
YORBA LINDA PLEGEL CIL COMPANY(BLATTNER-AH.A) tee 1.9493 115 131 786 1,222 1,345 1,496 1,623
YORBA LINDA COLUMBINE ASSOCIATES 12 0.1483 50 6 68 101 111 123 133
YORBA LINDA SHERWIN D.YOELIN 8 0.1510 25 12 65 99 109 121 131
Total for Permit Users 004,415 6,117.8307 17,914,101 7,478,311 8.490,663 11,478,853 12.300,310 13,323,051 14,193,169
H:beptlflm2l MSTREEMExceltiPermit Users=02-03 recan and rates Oct 2004.xls
9/29/2004
Permit User Rate Calculation Model
October 2004 Proposed 2004-05
A B 4 D E F Q H
Ref Description Coll 0&M Coll CIP Joint 0&M Joint CIP COPS Equity Ad] SFI Total
1 Budget Requirements: 22,605,790 62,058,000 86,614,140 169,165,600 41,917,000 2,638,000 1,876,000 386,874,530
2 Remove interfund budgets (2,638,000) (1,876,000) (4,514,000)
3 Remove Fluctuating CIP With Capacity (62,058,000) (169,166,600) (231,223,600)
4 Add Avg"Cash-funded"CIP W/o Capacity 9,877,061 32.550,843 42,427,904
5 Requirements for Rate Setting 22,605,790 9,877,061 86,614,140 32.550,843 41,017,000 0 0 193,564,em
6 Reduce for Interest Income (4,677,628) (12,750,874) (3,159,498) (20,58e,000)
7 Net Requirements for Smooth Rate Setting 22,605,790 5,199,433 86,614,140 19,799,969 38,757.502 0 0 172,976,834
No Capacity No Capacity No Capacity
8 Allocation Parameters: 04-05 Budget Validated CIP 03-04 Actual Validated CIP Combo VCIP
9 Flow 50% 90% 12% 35% 50%
10 BOD 10% 34% 33% 27%
11 SS 50% 54% 32% 23%
Resultant
Weighted
12 Allcwdon to Parameters: Coll 0&M Coll CIP Joint O&M Joint CIP COPS Total Average%
13 Flow 11,296,561 4,679,490 10,393,697 6,929,989 19,378,751 52,678,488 30%
14 BOD 0 510,943 29,448,808 6,533,990 10,464,526 46,967,266 27%
15 SS 11,309,229 0 46,771,636 6,335,990 8,914,225 73,331,080 42%
16 22,605,790 5,199,433 86,614,140 19.709,969 38,757,502 172,976,834 100%
Proposed
17 Parameter Rates: Coll O&M Coll CIP Joint O&M Joint CIP COPS Rat89 Would Raise
18 Flow Q 250 mgd,per MG 123.80 51.28 113.90 75.95 212.37 577.30 52,678,488
19 BOD Q 228 mg/L,per 1000 lb 0.00 3.00 169.72 37.66 60.31 270.68 46,987,266
20 SS®232.6 mg/L,per 1000 lb 63.89 0.00 264.23 35.79 50.36 1 414.27 ji 73,331,080
21 172,976,834
M:%deptltin12101STREEMExceHcld d copy\STRATPLN1Permlt user model 10-2004.xls-Oct 2004 Proposal
9/29/2004
Permit User Rate Calculation Model
Estimated 2005-06
A 8 D D E F Q H
Ref Description Coll O&M CcII CIP Joint O&M Joint CIP COPs Equity Ad) SFI Total
1 Estimated Budget Requirements: 23,420,000 62,058,000 89,740,000 169,165,600 48,586,000 2,638,000 1,876,000 397,483,600
2 Remove interfund budgets (2,638,000) (1,876,000) (4,614,000)
3 Remove Fluctuating CIP With Capacity (62,058,000) (169,165,600) (231,223,600)
4 Add Avg"Cash-funded"CIP W/o Capacity 9,877,061 32,550,843 42,427,904
6 Requirements for Rate Setting 23,420,000 9,877,061 89,740,000 32,550,843 48,586,000 0 0 204,173,004
7 Reduce for Interest Income (1,709,230) (5,632,939) (8,407,831) (15,750,000)
9 Net Requirements for Rate Setting 23,420,000 8,167,831 69,740,000 26,917,904 40,178,169 0 0 108,423,904
10 Allocation parameters: 04-05 Budget Validated CIP 03-04 Actual Validated CIP Combo VCIP
11 Flow 50% 90% 12% 35% 50%
12 BOD 10% 34% 33% 27%
13 SS 50% 54% 32% 23%
Resultant
Weighted
14 Allocation to parameters: Coll O&M Ccll CIP Joint O&M Joint CIP COPS Total Average%
15 Flow 11,710,000 7,351,048 10,768,800 9,421,266 20,089.085 59,340,199 31%
16 BOD 0 816,783 30,511,600 8,882,908 10,848,106 51,069,397 27%
17 SS 11,710,000 0 48,459,600 8.613,729 9,240,079 7a,024,308 41%
18 23,420,000 8,167,831 89,740,000 26,917,904 40,178,169 188,423,904 100%
Proposed
19 Parameter Rates: Rates Would Raise
20 Flow Q 255 mgd,per MG 125.81 78.98 115.70 101.22 215.84 637.55 59,340,199
21 SOD @ 228 mg/L,per 1000 lb 0.00 4.62 172.40 50.19 61.29 288.50 51,059,397
22 SS Q 232.6 mg/L,per 1000 lb 64.86 0.00 268.39 47.71 61.18 1 432.14 78,024,308
23 188,423,904
H:\de;Mfln12101STREEMExcehold d ccpy\6TRATPLN\Permft user model 10-2004.xts-net 05.Oa
9/29/2004
Permit User Rate Calculation Model
Estimated 2006-07
A B C 0 E F G H
Ref Description Coll O&M Coll CIP Joint O&M Joint CIP COPS Equity Ad] SFI Total
1 Estimated Budget Requirements: 24,256,000 62,058,000 92,988,000 169,165,600 62,278,000 2,638,000 1,876,000 415,259,600
2 Remove interfund budgets (2,635,000) (1,876,000) (4,514,000)
3 Remove Fluctuating CIP With Capacity (62,058,000) (169,165,600) (231,223,600)
4 Add Avg"Cash-funded"CIP W/o Capacity 9,877,061 32,560,843 42,427,904
6 Requirements for Rate Setting 24,256,000 9,877,061 92,988,000 32,550,843 62,278,000 0 0 221,949,904
7 Reduce for Interest Income (1,384,597) (4,563,079) (8,730.324) (14,678,000)
9 Net Requirements for Rate Setting 24,256,000 8,492,464 92,988,000 27,987,764 53.547,676 0 0 207,271,904
10 Allocation parameters: 04-05 Budget Validated CIP 03-04 Actual Validated CIP Combo VCIP
11 Flow 50% 90% 12% 35% 50%
12 BOD 10% 34% 33% 27%
13 SS 50% 54% 32% 23%
Resultant
Weighted
14 Allocation to parameters: Cell O&M Cell CIP Joint O&M Joint CIP COPS Total Average%
15 Flow 12,128,000 7,643.217 11,158,560 9,795,718 26,773.838 67,499,333 33%
16 Boo 0 849,246 31,615,920 9,235,962 14,457,872 56,159,001 27%
17 SS 12,128.000 0 50,213,520 8,956,085 12,316,965 83,613,570 40%
le 24,256,000 8,492,464 92,988,000 27,987,764 53,547,676 207,271.904 100%
Proposed
19 Parameter Rates: Rates Would Raise
20 Flow @ 260 mgd,per MG 127.80 80.54 117.58 103.22 282.13 711.27 67,499,333
21 800 Q 228 mg/L,per 1000 lb 0.00 4.71 175.20 51.18 80.12 311.21 56,159,001
22 SS a 232.6 mg/L,per 1000 lb 65.88 0.00 272.76 48.65 66.90 454.19 03,613,570
23 207,271,904
HAdephffMV MOTREER1Excehold d capylSTRATPLWIRermit user model 10-2004.xls-net M07
9/29/2004
Permit User Rate Calculation Model
Estimated 2007-08
A B C D E F 4 H
Ref Description Coll 0&M Call CIP Joint O&M Joint CIP COPS Equity Adj SFI Total
1 Estimated Budget Requirements: 25,138,000 62,058,000 96,337,000 169,165,600 75,898.000 2,636,000 1,876,000 433,110,600
2 Remove interfund budgets (2,638,000) (1,876,000) (4,514,000)
3 Remove Fluctuating CIP With Capacity (62,058,000) (169,165,600) (231,223,600)
4 Add Avg"Cash-funded"CIP W/o Capacity 9,877.061 32,550,843 42,427.904
6 Requirements for Rate Setting 25,138,000 9,877,061 06.337,000 32,550.843 75.898,000 0 0 239,800,904
7 Reduce for Interest Income (1,282,485) (4,226,557) (9,854,958) (15,364,000)
9 Net Requirements for Rate Setting 25,138,000 8,594,576 96,337,000 28,324,286 66,043,042 0 0 224,436,904
10 Allocation parameters: 04-05 Budget Validated CIP 03-04 Actual Validated CIP Combo VCIP
11 Flow 50% 90% 12% 35% 50%
12 BOD 10% 34% 33% 27%
13 SS 50% 54% 32% 23%
Resu Itent
Weighted
14 Allocation to parameters: Coll O&M Coll CIP Joint O&M Joint CIP COPS Total Average%
15 Flow 12,569,000 7,735,119 11,560,440 9,913,500 33,021,621 74,799,580 33%
18 BOO 0 859,458 32,754,580 9,347,014 17,831,621 60,792,673 27%
17 SS 12,569,000 0 52,021,980 9,063,772 15,189,900 88,844,661 40%
18 25,138,000 8,594,576 96,337,000 28.324,286 66,043,042 224,436,904 100%
Proposed
19 Parameter Rates: Rates Would Raise
20 Flow @ 265 mgd,per MO 129.95 79.97 119.52 102.49 341.40 773.32 74.799.580
21 BOD®228 mg/L,per 1000 lb 0.00 4.67 178.09 50.82 96.95 330.53 60,792,673
22 SS®232.6 mg/L,per 1000 lb 66.99 0.00 277.25 48.31 80.95 473.50 88,844,651
23 224,436,904
H:We;Mfln\210%STREEDExcel%old d copylSTRATPLN%Permft user model 10-2004.x1s-net 07-08
9/29/2004
Average "Cash-Funded" Validated Capital Improvement Program
Determination of Amount to Include in Permit User Rates
Total Refurbishment 17 Yr Average
Validated Additional Replacement Cash Funded
Total Plant and Collection System CIP Capacity Rehabilitation CIP
Validated Capital Improvement Program 2,504,663,155 861,842,506 1,642,820,649
Additional Capacity Projects 861,842,506 861,842,506 0
Total Refurbishment, Replacement and Rehabilitation 1,642,820,649 0 1,642,820,649
Funded by COPS (1,405,000,000/2,504,663,155) = 56% 921,546,279 0 921,546,279
Funded by Fees and Revenues 44% 721,274,370 0 721,274.370 42,427,904
Total Refurbishment, Replacement and Rehabilitation 1,642,820,649 0 1,642,820,649
Treatment, Disposal & Reclamation Plant
Validated Capital Improvement Program 1,930,018,000 669,639,990 1,260,378,010
Additional Capacity Projects 669,639,990 669,639,990 0
Total Refurbishment, Replacement and Rehabilitation 1,260,378,010 0 1,260,378,010
Funded by COPS (1,405,000,000/2,504,663,155)= 56% 707,013,676 0 707,013,676
Funded by Fees and Revenues 44% 553,364,334 0 553,364,334 32,550,843
Total Refurbishment, Replacement and Rehabilitation 1,260,378,010 0 1,260,378,010
Collection System
Validated Capital Improvement Program 574,645,155 192,202,516 382,442,639
Additional Capacity Projects 192,202,516 192,202,516 0
Total Refurbishment, Replacement and Rehabilitation 382,442,639 0 382,442,639
Funded by COPS (1,405,000,00012,504,663,155) = 56% 214,532,604 0 214,532,604
Funded by Fees and Revenues 44% 167,910,035 0 167,910,035 9,877,061
Total Refurbishment, Replacement and Rehabilitation 382,442,639 0 382,442,639
H:Ideptlf[n12101STREED1Exoellold d copy\STRATPLNIVCIP by flow,bad,as 2003 FAHR.xIs VCIP Allocation
9/29/2004
Allocation of JO Costs to Flow, BOD and SS
2003-04 Actual Costs
RAC Allocation Percentages Allocated Costs Percent
Flow BOD SS Flow BOD SS Total of Total
Preliminary Treatment 4,926,287 75% 5% 20% 3,694,715 246,314 985,257 4,926,287 6%
Primary Treatment 7,856,330 15% 25% 60% 1,178,450 1,964,083 4,713,798 7,856,330 10%
Secondary Treatment 5,364,031 100% - 5,364,031 - 5,364,031 7%
Cryogenic Plant 580,117 100% - 580,117 - 580,117 1%
Effluent Disposal 812,104 100% 812,104 - - 812,104 1%
Solids Handling 28,398,473 20% 80% - 5,679,695 22,718,778 28,398,473 35%
Subtotal 5,685,269 13,834,239 28,417,834 47,937,342 59%
Cogeneration 8,358,287 13% 40% 47% 1,086,577 3,343,315 3,928,395 8,358,287 10%
Utilities 9,643,305 13% 40% 47% 1,253,630 3,857,322 4,532,353 9,643,305 12%
Electrical Distribution 1,118,848 13% 40% 47% 145,450 447,539 525,859 1,118,848 1%
Miscellaneous Bldgs 4,770,650 13% 40% 47% 620,185 1,908,260 2,242,206 4,770,650 6%
Air Quality 1.597,905 13% 40% 47% 207,728 639,162 751,015 1,597,905 2%
Laboratory 7,155,674 13% 40% 47% 930,238 2,862,270 3,363,167 7,155,674 9%
Total 80,582,011 9,929,076 26,892,107 43,760,828 80,582,011 100%
Calcusted Actual Ratios for 2003-04
Direct Charges(Subtotal) 12% 29% 59% 100%
Total Charges 12% 34% 54% 100%
H:ldeptlfln12101STREED1ExosINPermit UserslPermit User JO Mocatlon 2008-04.)ds
9/29/2004 Validated Capital Improvement Program Page 1 of 5
Allocation to Flow,BOD and SS Less Capacity Projects
A B C 0 E F G H I
New Capacity Total Allocated Total Allotted Total Allocated Total Allocated
Project 7rda Flow BOD TSS Total thru 2020 Percentage of Non Cepedly CIP Non Capacity CIP Non Capacity CIP Non Cepadly CIP
Cast Flew BOD SS Total Allocated
1-17 Santa Ana Trunk Sewer Rehab 90% 10% 14,638,000 13,174,200 1,463,600 0 14,638,000
1-22 Lower Main-Broadway MH Rehabilitation 90% 10% 1,467,000 1,320,300 146,700 0 1,467,000
1-86 Contlnuous Feed Chemical Treatment Facility 90% 10% 461,000 405,000 45,100 0 451,000
1-98 Trunk Sewer Mapping Prefect 90% 10% 2,013,000 1,611,700 201,300 0 2,013,000
1-100 Greenville Sullivan/Rakt Street Manhele Rehab 90% 10% 3,269,000 2,942,100 326,900 0 3.269,000
2-24-1 Carbon Cnyn Sewer and Pump Stn Abandonment 90% 10% 3,467,000 50% 1,560,150 173,350 0 1,733,600
2-31 Santa Ana River Interceptor Relief Sewer 90% 10% 17,272,000 76% 3,886,200 431,800 0 4,318,000
2-41 Santa Ana River Interceptor Realignment and Prot 90% 10% 63,620,000 57,268,000 6,362,000 0 63,620,000
2-41-1 Abandonment eflhe existing SARI In SA River 90% 10% 8,456,000 7,610,400 845,600 0 8,456,000
2-42 Abend.of Ycrba Linda Pump Station 90% 10% 955,000 $59,600 95,500 0 955,000
2-49 Taft Stanch Improvements 90% 10% 3,608,000 50% 1,578,600 175,400 0 1,754,000
2-50 Atwood Subtrunk improvements 90% 10% 3,187,000 50% 1,434,150 159,350 0 1,693,600
2-61 Lower Santa Ana River Intercepter Improvements 90% 10% 35,012,000 75% 7,877,700 875,300 0 8.753,000
2-62 Euclid Relief Improvements-Reach"A" 90% 10% 20,856,000 50% 9,385,200 1,042,800 0 10,428,000
2.53 Euclid Relief Improvements-Reach"B" 90% 10% 10,298,155 75% 2,317.085 257,454 0 2,574,539
2-66 Santa Ana River Relief Sewer,Reach B 90% 10% 32,702,000 100% 0 0 0 0
2-65 Newhope-Plaeentle 8 Cypress Trunk Replacements 90% 10% 28,785,000 75% 6,476,625 719,625 0 7,196,250
2-66 Upper B Lower Newhope-PleoentleMHReheb(lWlon 90% 10% 4,351,000 3,915,900 435,100 0 4,351,000
2-67 SARI and South Anaheim Interceptor MH Rehab 90% 10% 3,087,000 2,778,300 308,700 0 3,087,000
2-68 Rehabilitate District Siphons By Adding Ali Jumper 90% 10% 6,731,000 5,167,900 673,100 0 5,731,000
3.36-R2 Rehabilitation of Ma9nolle Trunk Sewer 90% 10% 48,868,000 43,981,200 4,866,600 0 48,868,000
3-45 Trask Branch ofthe Hoover-Western Subtrunk 90% 10% 1,410,000 75% 317,250 35,250 0 362,600
3-62 Rehabilitation of the WeaWde Pump Station 90% 10% 2,991,000 2,691.900 299,100 0 2,991,000
3-65 Westelde Relief Interceptor/Los Alamitos MH Rehab 90% 10% 17,136,000 75% 3,855,600 428,400 0 4,284,000
3-66 Rehabilitation ofthe Sesi Beach and Edinger PS 90% 10% 8,574,000 7,716,600 867,400 0 8,574,000
6-29-R1 Lining of W'NPTB FM(Juno Bat to end Angie Pt) 90% 10% 1,996,000 1,796.400 199,600 0 1,996,000
5-46 Replacement of Back Bay Trunk Sewer 90% 10% 7,189,000 6,470,100 718,900 0 7,189,000
6-47 Balboa Trunk Sewer Rehsbh tdcn 90% 10% 5,759,000 5,183,100 575,900 0 5,759,000
6-49 Replacement of the Bitter Point Pump Station 90% 10% 8,159,000 10% 6,608,790 734,310 0 7,343,100
6-60 Replacement of the Rocky Point Pump Station 90% 10% 9,362,000 10% 7,583,220 842,580 0 8.425,800
6-61 Rehabilitation of the 14th Street Pump Station 90% 10% 4,617,000 4,155,300 461,700 0 4,617,000
6-52 Rehabilitation of the"A"SU tPumpStation 90% 10% 5,013,000 4,511,700 501,300 0 6,013,000
6-63 Rehabilitation cfthe Bay Bridge Pump Station 90% 10% 2,612,000 10% 2,115,720 235,080 0 2,350,800
6.64 Rehabilitation ofthe Crystal Cove Pump Station 90% 10% 1,512,000 1,360,800 151,200 0 1,512,000
"a PCH FM Bitter Pt Pa To Coast Trunk 418 hurst a PCH 90% 10% 13,927,000 12,534,300 1,392,700 0 13,927,000
6-69 Big Canyon Trunk Sewer Rehab 8 Replacement 90% 10% 2,534,000 2,260,600 253,400 0 2,534,000
6-13 Abend of AS Trunk,Watson and Col.Sewers 90% 10% 351,000 315,900 36,100 0 351,000
6-13.3 Abandonment of Alrbase Trunk Sewer-California St 90% 10% 975,000 877,600 97,500 0 975,000
6-16 Abandonment of Alrbase Trunk(Watson St)8 Co:lege 90% 10% 3,276,000 2,948,400 327,600 0 3,276,000
7-7-2 Modi icaticns to the Main Street Pump Station 90% 10% 9691000 872,100 981800 0 969,000
7-14-4 Covey Lane Pump Station Abandonment 90% 10% 153,000 137,700 15,300 0 153,000
7-21 Sunflower Interceptor Manhole Rehab 90% 10% 3,991,000 3,591,900 399,100 0 3,991,000
7-32-1 Gisler Red Hill Trunk Sewer Relocation-Phase 1 90% 10% 936.000 $42,400 93,600 0 936,000
7-37 Glaler-Redhlli System Improvements,Reach 8 90% 10% 6,893,000 50% 3,101,850 344,850 0 3,446,500
7-47 Replacement of the College Ave.Pump Sidon 90% 10% 6,021,000 30% 3,793,230 421,470 0 4,214,700
7-49 Rehabilitation cf the MacArthur Pump Station 90% 10% 2,355,000 10% 1,907,550 211,950 0 2.119,500
H:ldeptltint21t118TREED1Exceilold d ccpylSTRATPLNIVCIP by flaw,bod,se 21203 FAHR.xI9 VCIP lea capacity
9/29/2004 Validated Capital Improvement Program Page 2 of 5
Allocation to Flow,BOD and SS Less Capadty Projects
A B C D E F 0 H I
New Capacity Total Allocated Total Allocated Total Allocated Total Alocated
project Title Flow 800 TSS Total thru 21320 PeroWtege of Non Capeofty CIP Non Cape"CIP Non Capacity CIP Non Capacity CIP
Cost Flaw SOD SS Total Allocated
7-66 Tustin WestiLemon Heights Trunk Improvements 90% 10% 5,926,000 50% 2,666,700 296,300 0 2,963,000
7-57 Lower 01slar-Redhlll Trunk Relocation and MH Rehab 90% 10% 6,615,000 26% 4.466,125 496,126 0 4,961.250
7-68 Gleler Radhill Trunk Impray.6 orange Trunk Improv 90% 10% 23,561,000 50% 10,602,450 1,178,050 0 11,780,500
7.69 Upper 13lsler-RedhlllNH Rehabilitation 9CempueOr 90% 10% 2,121,000 1,908,900 212,100 0 2,121,000
11-14-R Newland Street Interceptor Sewer Protection 90% 10% 127,000 114,300 12,700 0 127,000
11-22 Warner Avenue Relief Sewer 90% 10% 7,480,000 75% 11683,000 187,000 0 1,870,000
11-26 EdingerlSClasChlce Trunk lmprovemente 90% 10% 2,128,000 76% 478.350 63,150 0 531,500
11-26 Coast Trunk Sewer Rehabilitation 90% 10% 16,635,000 14,971,5C0 1,663,500 0 16,635,000
FE-Collect Facilities Engineering Projects-Collections 90% 10% 5,400,000 4,660,000 540,000 0 5,400,000
1.2-4 Bushard Trunk Sewer Rehabilitation 90% 10% 39,393,000 35,463,700 3,939,300 0 39,393,000
1-10 Replacement of the Ellie Ave Pump Stn 00% 10% 33,837,000 90% 3,046,330 336,370 0 3,383,7C0
SP-95 Pump Station P81Ds and Equipment Tagging 90% 10°% 720,000 648,000 72,000 0 720,000
Collections Facilities Total 574,645,155 322,984,025 35,687,114 0 358,871,139
Weighted Average Allocation 90% 10% 0%
P1-62 Sunflower Drive Replacement 75% 5% 20% 815,000 611,250 40,750 163,000 815,000
P1-71 HeadwerksRehobfIRAMcn/RetLrMshment 75% 5% 20% 37,510,000 28,132,500 1,876,500 7,502,000 37,510,000
P2-66 Headwaft Improvements at Plant No 2 75% 5% 20% 226,130,000 169,597,500 11,306,500 46,226,000 226,130,000
J-83 PLC Programming and Integration 75% 5% 20% 515,000 386,250 26,750 103,000 515,000
Headworks Total 264,970,000 198,727,500 13,248,500 52,994,000 264,970,000
P1-37 PH Clarifers 16-31 8 Related Facilities 30% 70% 86,561,000 100% 0 0 0 0
P2-80 Primary Treatment RehaWRefurb 30% 70% 55,093,000 0 16,527,900 38,666,100 55,093,000
SP-70 Sludge Density Meter Upgrades 30% 70% 800,000 0 240,000 560,000 800,000
122-66 Circular Clarifier Drive RepleoementfUpgrade 30% 70% 3,467,000 0 1,040,100 2,426,900 3,467,000
Primary Treatment Total 147,921,000 0 17,808,000 41,552,000 59,360,000
P2-74 Secondary Plant Rehabilitation 93% 7% 20,474,000 0 19,11 7,063 1,436,937 20,474,C00
p2.47-3 Sec Treat Monftcrtng 8 Crdrl Sya Upgrade 93% 7% 8,703,000 0 8,092,193 610,807 8,703,000
P1-76 Tricking Filter Rehabilitation and New Clarifiers 93% 7% 46,210,000 33% 0 28,787,770 2,172,930 30,960,700
P1-82 Activated Sludge Plant Rehabilitation 93% 7% 23,870,000 26% 0 16,646,040 1,256,460 17,902,500
SP-72 Oxygen Perri Repacement/RehabElita@on Assessment 93% 7% 2,145,000 0 1,994,466 160,544 2,145,000
SP-74 Activated Sludge Aeration Basin Selector Study 93% 7% 945,000 0 878,677 66,323 945,000
SP-91 Computer Modeling of Activated Sludge System 93% 7% 120,000 0 111,678 8,422 120,C00
Pt-102 New secondary treatment"am at Plant No.1 93% 7% 261.100.000 60% 0 93.390,771 7,049.229 100,440,000
P2-90 New Tricking Filters 93% 7% 128,727,000 60% 0 47,876,996 3,613,804 51,490,800
Secondary Treatment Total 482,294,000 0 216,815,644 16,365,455 233,181,000
SP-36 Sludge Grinder Replacement 20% 80% 224,000 0 44,800 179,200 224,000
P2-60 Solids Storage and Trunk Loading Facility 46% 55% 14,582,000 20% 0 6,249,620 6,416,080 11,665,600
SP-30-2 High Rate Digester Mix Pumps Mach,Seale 25% 75% 517,000 0 129,250 387,760 617,000
SP-79 Tula Rench Mafntensnce/Blosolids Management Needs 45% 55% 200,000 0 90,000 110,000 200,CC0
Pt-99 Digesters,Centrtfuge/Press 8 Cake Storage Hopper 25% 75% 61,605,000 80% 0 3,080,260 9,240,760 12,321,000
P2-89 Digesters and Sludge Cake Hoppers at Plant 2 25% 75% 42,325,000 60% 0 2,116,250 6,348,750 8,465,CC0
122-92 Sludge Dewatering and Odor control at Plant 2 20% 80% 79,082,000 0 15,816,400 63,265,600 79,082,000
P2-91 Digester RehebottatlanatP%rt2 25% 75% 25,621,000 0 6,405,260 19,216,750 25,621,000
P1-100 Sludge Digester Rehabllftatlon at Plant 1 26% 76% 30,223,000 0 7,655,760 22,667,260 30,223,000
121-101 Sludge Dewatering and Odor central at Plant 1 20% 80% 62,905,000 0 12,681,000 50,324,000 62,905,000
131-96 Ammonia Side Stream Treatment 100% 18,600,000 100% 0 0 0 0
H:1depllftnt2101STREED''Excdlcid d oopylSTRATPLNWCIP by flow,bad,as 2003 FAHR.k19 VCIP lass capacity
9/29/2004 Validated Capital Improvement Program Page 3 of 5
Allocation to Flow,BOD and SS Leas Capacity Projects
A B C D E F p H I
New Capacity Total Allocated Total Aft" Total Allocated Total Mac"
Project TWO Flaw SOD TSS TOW thru 2020 Percentege of Non Cepecity CIP Non Capacity CIP Non Cepedty CIP Non Capactly CIP
Celt Flaw BOD 55 ToW Alec"
Solids Handling&Digeation Total 335,884,000 0 53,068,470 178,155,130 231,223,600
HIdeptTn121 t11STREEMExoMold d Oopy15TRATPLNWCIP by flaw,bad,as 20M FAHR xls MIR less Oepedty
9/29/2004 Validated Capital Improvement Program Page 4 of 5
Allocation to Flaw,BOD and SS Less Capacity Projects
A 8 C 0 E F G H I
New Capacity Total Allocated Total Allocated Total Allocated Total Allacated
Project Title now BOD TSS Total thru 2020 Percentage of Non Capacity CIP Non CspadV CIP Non Capacity CIP Non Cap"CIP
Coat Flaw BOD SS Total Allocated
J-77 Effluent Pumping Station Annex 100% 50,757,000 50% 25.378,500 0 0 25,378,500
J-67 Peak Raw Management 100% 11,257.000 100% 0 0 0 0
SP-88 NPOES Permit Renewal 100% 1,512,000 1,512,000 0 0 1,512,000
J-87 Short Term Outsell Bacteria Reduction 100% 7,578,000 7,578,000 0 0 7,578,000
Ocean Outfall Systems Total 71,104,000 34,468,600 0 0 34,468,500
JA7 Cable Trey Improvements at Plants 1&2 29,526,000 0 0 0 0
P2-79 Gas Compressor Addition at Plant No 2 4,326,000 0 0 0 0
J-2" Elec Power System Single-line Diagrams 3,368,000 0 0 0 0
J-33-IA Standby Power and Reliability Modification 17,643,000 0 0 0 0
P2-82 UtllfUes Rehabilitation and Refurbishment 4,929,000 0 0 0 0
J-79 Central Generation Automation 8,038,000 0 0 0 0
SP-81 Electrical Equipment Refurbishment and Protection 3,312,000 0 0 0 0
SP-93 Indoor/Outdoor Lighting Study 132,000 0 0 0 0
P1-97 Plant 1 66kV Substation 4,645,000 50% 0 0 0 0
SP-92 Rehabilitation of Low Pressure Gas Holder 422,000 0 0 0 0
P2-87 Fuel Station Replacement at Plant No 2 3,231,000 0 0 0 0
SP-94 Plant 1 Plant Water VFD Replacement 2,334,000 0 0 0 0
J-92 Area Clessiffcaticn Studies Implementation Plan 21,283,000 50% 0 0 0 0
Utility Systems Total 103,189,000 0 0 0 0
J-71-3 Facilities ModlAcations for Odor Control 4,127,000 0 0 0 0
J-71-8 Rehabilitation of Odor Control Fsdllties 33,224,000 0 0 0 0
Odor Control Related Projects Total 37,351,000 0 0 0 0
J-42 Plant Reinvention f Automation Project 21,915,000 0 0 0 0
SP-01 Document Management 864,000 0 0 0 0
SP-02 Data ttegrattan 4,334,000 0 0 0 0
SP-13 Source Control Programming 2.956,000 0 0 0 0
SP-03 Strategic Information Architecture(SIA) 724,000 0 0 0 0
SP-15 Geographic lnformation System 4,157,000 0 0 0 0
J-33-3 Power Monitoring and Control Systems 3,790,000 0 0 0 0
SP-09 Internetllntranet Development 650,000 0 0 0 0
SP-61 SCADA System Replacement Study 300,000 25% 0 0 0 0
SP-62 SCADA Graphics Tagging Update 425,000 0 0 0 0
SP-64 FIS Upgrade 3,213,000 0 0 0 0
SP-65 Information Technology Disaster Recovery 332,000 0 0 0 0
SP-89 Network Equipment upgrade 2,901,000 0 0 0 0
SP-100 CMMS System Replacement 3,789,000 25% 0 0 0 0
Plant Automation d Computerization Total 50,350,000 0 0 0 0
SP-63 Plant O&M Manuel&SOP Project-Phase I 4,000,000 0 0 0 0
SP-64 Hazardous Energy Control Procedures 1,190,000 0 0 0 0
J-44-R Standard SpedRoiticne Revisions and Updates 657,000 0 0 0 0
SP-68-1 Corrosion Management 7,548,000 0 0 0 0
SP-1 Special Projects:Ammonia Reduction Options 277,000 100% 0 0 0 0
SP-90-1 Special Projects:Anoxlc Gas Flotation(AGF) 798,000 0 0 0 0
SP-90-7 Spacial Projects:Bictrlcktng Filter(BTF) 328,000 0 0 0 0
SP-SO-2 Special Projects:Anaerobic Beffled Reactor(ABR) 514,000 0 0 0 0
SP-90-6 Special Projects Dewatering Options Comparison 99,000 0 0 0 0
H:>deptlfln\21 ONSTREEMExcenold 4 copyMRATPLNIVCIP by Row,bod,as 2003 FAHR xle VCIP less capacity
9/29/2004 Validated Capital Improvement Program Page 5 of 5
Allocation to Flow,BCD and SS Less Capacity Projects
A B C D E F Q H I
New Capacity Total Allocated Total Allocated Total Allocated Total Allocated
Project Title now BOO TSS Total thru 2020 Percentage of Non Capacity CIP Nan Capacity CIP Non Capacity CIP Non Capacity CIP
Cost Flaw BOO as Total Allocated
SP-90-5 Special Projects:Mlerditratlen/Prlmary Effluent 4,095,000 50% 0 0 0 0
SP-90-4 Special Projedn Oxygen Ionization I Odcr Contrci 210,000 0 0 0 0
SP-90.3 Special Projects:Primary Effluent Filtration 470,000 0 0 0 0
J-94 Effluent Pathogen Reduction Alternatives Plan 1,549,000 0 0 0 0
Process Related Special Projects Total 21,735,000 0 0 0 0
J-62 Mcc(McaBons to Existing Mach Systems 3,007,000 0 0 0 0
FE-J Facilities Engineering Projects-Joint 18,200,000 0 0 0 0
FE-132 Facilities Engineering Projects-Plant 2 18,200,000 0 0 0 0
FE-P1 Facilities Engineering Projects-Plant 1 18,200,000 0 0 0 0
J-69 Building RehabllRatlon/Refurblahment 1,455,000 0 0 0 0
SP-34 Smell Cap Equip Replacement Project 3,000,000 0 0 0 0
SP-06 Security System Improvements 1,100,000 0 0 0 0
SP-68-2 Asset Management Program 16,555,000 0 0 0 0
SP-T7 Warehouse Relnventlon Project 600,000 0 0 0 0
J-25-6 interim Fac Retard 8 Eng Data Syst Malnt Services 628,000 0 0 0 0
SP-85 Plume Modeling 377,000 0 0 0 0
J40.6 Supplement No 1 to the 1999 Strategic Plan EIR 832.000 0 0 0 0
J-40-7 Long Range Blosollds Management Plan 2,833,000 0 0 0 0
J-40-9 Strategic Plan Update 3,419,000 25% 0 0 0 0
1-84 Space Aliecatlon and interior Renovation 16,388,000 0 0 0 0
J-88 Laboratory Rehabtlttdon 1,829,000 0 0 0 0
J-89 Tenant Improvements to Rebuild Shop 321,000 0 0 0 0
J-40-10 Supplemental Full Secondary Treatment CEQA Doc 425,000 15% 0 0 0 0
J-90 Engineering Trailer Complex 2,006,000 0 0 0 0
P1-103 Support Building Power System ModiflcaUcne 2,751,000 0 0 0 0
SP-98 Plant 2 Maintenance Building ModhIcadons 300,000 0 0 0 0
Mlacellaneoua&Support Projects Total 112,426,000 0 0 0 0
J-36 t3roundwater Replenishment System 100% 236,206,000 64% 85,034,160 0 0 85,034,160
J-72 Water Canservatlen 100% 4,644,000 100% 0 0 0 0
J-73 C"p Projects,intlownnfllt Reduction 0 100% 0 0 0 0
J-73-2 Long Term Permanent Menftoring Program 100% 2,852,000 100% 0 0 0 0
Water Management Projects Total 243,702,000 85,034,160 0 0 85,034,160
Districts Cepftal Equipment Budget 59,092,000 25% 0 0 0 0
Diatricta Capital Equipment Budget 59,092,000 0 0 0 0
Treatment d,Disposal Total 1,930,018,000 318,230,160 300,940,514 289,066,586 908,237,260
Weighted Average Allocation 36% 33% 32%
Combined Total CIP 2,504,663,155 641,214,185 336,827,628 289.066,686 1,267,108,399
Combined Weighted Average Allocation For COPS 60% 27% 23%
H:ldept\@nt21MSTREEI 1Exoellold d ccpylSTRATPLN%VCIP by flow,bod,se 2CO3 FAHR xis VCIP leas oapsdty
ORDINANCE NO. OCSD-24
ADOPTING REVISED TABLE G RE PERMITTEE CHARGES FOR USE
AND REAFFIRMING ALL OTHER CHARGES
AN ORDINANCE OF THE BOARD OF DIRECTORS OF ORANGE
COUNTY SANITATION DISTRICT ESTABLISHING SANITARY SEWER
SERVICE CHARGES; ESTABLISHING CAPITAL FACILITIES
CAPACITY CHARGES; ADOPTING MISCELLANEOUS CHARGES AND
FEES RELATING TO INDUSTRIAL CHARGES, SOURCE CONTROL
PERMITTEES AND WASTEHAULERS; AND REPEALING ORDINANCE
NO. OCSD-22.
WHEREAS, the Board of Directors of the Orange County Sanitation
District ("District") has previously adopted Ordinance No. OCSD-22, establishing
annual Sanitary Sewer Service Charges for all uses, establishing Capital
Facilities Capacity Charges to be imposed when properties either newly-connect
to the District's system, or expand the use of the property previously connected
to the District; establishing miscellaneous industrial discharger fees, source
control/non-compliance sampling fees, and wastehauler charges, which
Ordinance is presently in full force and effect; and
WHEREAS, for purposes of improved efficiency and effectiveness of the
District's operations, it is the intent, by the adoption of this Ordinance, to re-enact
the existing Ordinance that establishes sanitary sewer service charges and
capital facilities fees, and to provide for increases in certain miscellaneous
charges and fees.
NOW, THEREFORE, the Board of Directors of the Orange County
Sanitation District does hereby ORDAIN:
Section I. Fees and Charges Ordinance —Adopted
TABLE OF CONTENTS
ARTICLE I: RECITAL OF FINDINGS
Section 1.01, Findings — Declaration of Intent
ARTICLE II: SANITARY SEWER SERVICE CHARGES
Section 2.01, Purpose and Scope
Section 2.02, Annual Sanitary Sewer Service Charge
WS&S-TLW:pj:188361,v-3:11/02//04 1
Section 2.03
A. Exemptions
B. Application for Rebate
C. Application for Refund
D. Limitation Period
E. Determination
F. Administrative Fee
Section 2.04, Annual Charge Based on Fiscal Year
Section 2.05, Method of Collection
Section 2.06, Credit for Industrial Permittees
Table A Annual Sewer Service Charges for
Residential Users
Table B Annual Sewer Service Charges
Property Use Classifications for
Commercial or Industrial Users
ARTICLE III: CAPITAL FACILITIES CAPACITY CHARGES
Section 3.01, Purpose and Scope
Section 3.02, Definitions
Section 3.03, Connection Permits: Required
Section 3.04, Capital Facilities Capacity Charge: Payment
Section 3.05, Capital Facilities Capacity Charge:
Time of Payment
Section 3.06, Capital Facilities Capacity Charge:
Schedule of Amounts
Section 3.07, Supplemental Capital Facilities Capacity
Charge: Significant Commercial — Industrial
Users — Special Purpose Dischargers —
Definitions
Section 3.08, Supplemental Capital Facilities Capacity
Charge: New Significant Commercial —
Industrial Users
Section 3.09, Supplemental Capital Facilities Capacity
Charge: New Special Purpose Dischargers
Section 3.10, Supplemental Capital Facilities Capacity
Charge: Existing Significant Commercial —
Industrial Users — Special Purpose
Dischargers
Table C Supplemental Capital Facilities Capacity
Charges
Section 3.11, Capital Facilities Capacity Charge:
Replacement
Section 3.12, Capital Facilities Capacity Charge: Remodeled
Section 3.13, Payment of Capital Facilities Capacity Charge:
Off-Site Sewers Not Part of Master Plan
Relative to Reimbursement Agreements
WS&S-TLW:pj:188361,v-3:11/02//04 2
Section 3.14, No Refund or Transfer
Section 3.15, Baseline Transferability
Table D Capital Facilities Capacity Charges
ARTICLE IV: MISCELLANEOUS CHARGES AND FEES RELATING
TO INDUSTRIAL DISCHARGERS, SOURCE CONTROL
PERMITTEES AND WASTEHAULERS
Section 4.01, Purpose and Scope
Section 4.02, Administrative Fees and Charges
Relating to Permittees
Section 4.03, Industrial Discharger, Source Control,
and Non-Compliance Sampling Fees
Section 4.04, Special Purpose Discharge Permittees;
Charges for Use
Section 4.05, Class I and Class II Permittees — Charges
for Use
Section 4.06, Wastehauler Charges for Use
Section 4.07, Administrative Appeals
Table E Administrative Fees and Charges Relating
To Permittees
Table F Industrial Discharger, Source Control and
Non-Compliance Sampling Fees
Table G Class I and Class II Permittees and Special
Purpose Discharge Permittees Charges
For Use
Table H Wastehauler Charges for Use
ARTICLE V: MISCELLANEOUS
Section 5.01, Application of Ordinance
Section 5.02, Exceptions
Section 5.03, Severability
Section 5.04, Effective Date
Section 5.05, Repeal
Section 5.06, Certification and Publication
ARTICLE I
RECITAL OF FINDINGS
Section 1.01. Findings — Declaration of Intent. The Board of
Directors of District has previously adopted Master Plans, as more particularly
described in Findings B, C, D, and E below, setting forth the financial and
engineering needs of the District, and hereby adopts the following Findings
supporting the amounts of charges and fees adopted pursuant to this Ordinance.
WS&S-TLW:pj:188361,v-3:11/02//04 3
A. That the former County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11,
13 and 14 of Orange County, California (the "Predecessor Districts"), were nine
individual County Sanitation Districts, organized pursuant to the County
Sanitation District Act (California Health & Safety Code Section 4700 et seq.). By
action of the Board of Directors of the Predecessor Districts, pursuant to specific
legislation enacted by the California State Legislature in 1996, an application was
submitted to the Orange County Local Agency Formation Commission to legally
consolidate the nine Predecessor Districts into one single Sanitation District for
all purposes. The application was approved, with an effective date of July 1,
1998. As of July 1, 1998, the Predecessor Districts ceased to exist, and one
single consolidated County Sanitation District, known as the Orange County
Sanitation District, came into existence in place of the Predecessor Districts. The
District was formed to carry on the functions of the Predecessor Districts.
B. That a comprehensive 30-year Master Plan of Capital
Facilities, entitled "Collection, Treatment and Disposal Facilities Master Plan —
1989", hereinafter referred to as the "Master Plan", which includes detailed
financial and engineering reports, was prepared, approved, and adopted by the
Boards of Directors of the Predecessor Districts in 1989, setting forth and
identifying the required future development of District Facilities, including the
financial projections for providing sewer service to all properties within the
individual service areas of each of the nine Predecessor Districts.
C. That the financial and engineering reports of the Master Plan
were made available to the public, both prior to and subsequent to the adoption
of the Master Plan, and were subject to noticed public hearings, all in accordance
with the provisions of the California Constitution and Government Code Section
66016, and other provisions of law.
D. That the District, in 1997, as part of its maintenance and
updating of its Master Plan, undertook a comprehensive evaluation and study of
its operational and financial needs for the next 20 years, including a detailed
assessment of all types and categories of users; the demands on the system and
capacity needs of the system to provide necessary service to the multiple
categories of users; the total costs of the existing and future facilities in the
system; and alternate methodologies for establishing fair and equitable charges
to connect to and gain access to the system. These comprehensive planning,
engineering, and financial studies led to the development of an updated
Comprehensive Master Plan of Capital Facilities, which was approved and
adopted by OCSD Resolution No. 99-21 of the Board of Directors on October 27,
1999.
E. That in support of this Ordinance and the revised charges for
sewer service and/or Capital Facilities Capacity Charges as provided for on
Tables A, C, D and G herein, the Board of Directors finds that the Capital
Improvement Program ("CIP") Validation Study for Fiscal year 2003-04 and the
WS&S-TLW:pj:188361,v-3:11/02//04 4
Secondary Treatment Peer Review, as approved by the Board of Directors, has
resulted in the development of a Capital Improvement Program that provides for
the implementation of secondary treatment standards, thereby improving effluent
quality in a reasonably short period of time, consistent with the goals and policies
of the Board of Directors, the member agencies, and the public, while also
providing for the construction of necessary improvements to accommodate
projected increased flows and the rehabilitation and refurbishment of existing
facilities. The Board further finds that programming annual adjustments in sewer
service charges over a period of years is appropriate and ensures adequate
revenues to finance the improvements and programs necessary to implement
secondary treatment standards, accommodate increased flows, rehabilitate and
refurbish existing facilities, and retire any necessary or prudent debt incurred to
finance such improvements in a reasonable manner and over a reasonable
period of time. The Board of Directors also finds that such Sanitary Sewer
Service Charges and Capital Facilities Capacity Charges are reasonably related
to, and do not exceed the cost of providing sewer services.
F. That the financial requirements of the District, as shown in
reports prepared by Staff and Consultants relating to the Strategic Plan and the
CIP validation studies, are based on current, reliable information and data
relating to population projections, wastewater flow, and capital facilities' needs,
and are expected to be realized in each year as described in the reports.
G. That the revenues derived under the provisions of this
Ordinance will be used for the acquisition, construction, reconstruction,
maintenance, and operation of the sewage collection, wastewater treatment and
disposal facilities of the District; to repay principal and interest on debt
instruments; to repay federal and state loans issued for the construction and
reconstruction of said sewerage facilities, together with costs of administration
and provisions for necessary reserves; and to assist in the payment of costs to
the District to provide all regulatory administration and laboratory services related
to the industrial dischargers, source control permittees, and wastehauler users of
the District's systems.
H. That the owners or occupants of properties upon which all
fees and charges established by this Ordinance are levied, discharge wastewater
to the District's collection, treatment and disposal facilities. The costs of
operating and maintaining said facilities have constantly increased due in part to
increased regulatory requirements to upgrade the treatment process.
I. That the need for upgraded and improved treatment of all
wastewater collection, treatment and disposal facilities is required to protect the
public health and safety, and to preserve the environment without damage.
J. That the Sanitary Sewer Service Charges established and
levied by this Ordinance are to allow the District to recover the reasonable costs
WS&S-TLW:pj:188361,v-3:11/02/104 5
to provide a service to individual properties which have been improved for any of
numerous types of uses. The basis for the respective charge is the request of
the owner of property or a structure thereon, for the benefit of him/her/itself, or
the occupants of the property, to receive a service based upon actual use,
consumption, and disposal of water to the District's system in lieu of disposal by
other means.
K. That the Sanitary Sewer Service Charges established by this
Ordinance are not imposed as a condition of approval of a development project,
as defined in California Government Code Section 66001, and do not exceed the
estimated reasonable cost to provide the sewer service for which the fee is
levied, as provided in Government Code Sections 66013 and 66016 and
California Constitution Article MID.
L. That the Sanitary Sewer Service Charges adopted herein
will not necessarily result in an expansion of facilities to provide for growth
outside the existing service area. The adoption of these Sanitary Sewer Service
Charges will not result in any specific project, nor result in a direct physical
change in the environment.
M. That the Sanitary Sewer Service Charges adopted herein
are established upon a rational basis between the fees charged each customer
and the service and facilities provided to each customer of the District, a portion
of which are necessary to replace the loss of ad valorem property taxes to the
State General Fund as a result of state legislative action on September 2, 1992,
and in subsequent years.
N. That the Board of Directors has previously, by duly adopted
Ordinances, commencing in 1969, and most recently by Ordinance No. OCSD-
22, established Capital Facilities Capacity Charges, formerly known commonly
as "connection charges" or "fees", to be paid by all persons obtaining a permit to
connect to the District's system. Said Charges are required as a financial
payment to have access to and use of the District's wastewater collection,
treatment and disposal facilities in existence at the time of connecting to the
system, and for future facilities to be constructed.
O. That the Sanitary Sewer Service Charges and Capital
Facilities Capacity Charges established here, are an incident but not a condition
of development, payable only on request to receive service by the property
owner for the benefit of those persons on the property that use the service. The
charges are not an incident of property ownership, nor are they a property-
related service having a direct relationship to property ownership. Accordingly,
the provisions of California Constitution Article XIIID are not applicable.
P. That the District's previous and present Capital Facilities
Capacity Charges Ordinances, include[d] authority for the District to levy an
WS&S-TLW:pj:188361,v-3:11/02//04 6
excess or supplemental capacity charge upon commercial and industrial users
who discharge quantities or high strength wastewater greater than the
established base line of authorized discharge.
Q. That the Capital Facilities Capacity Charges re-enacted by
this Ordinance are non-discriminatory, as applied to all users of the system, and
are established upon a rational basis between the fees charged each category of
property that is connecting, and the service and facilities provided to each
connected property or structure, by the District, within a given category.
R. That the miscellaneous charges and fees re-enacted by this
Ordinance without change are established upon a rational basis between the
fees charged to each industrial discharger, source control permittee, or
wastehauler and the service and facilities provided to each.
S. That the District is required by federal and state law,
including the Federal Water Pollution Control Act, also known as the Federal
Clean Water Act (33 U.S.C. 1251, et seq.), the General Pretreatment
Regulations (40 C.F.R. 403), and the Porter-Cologne Water Quality Control Act
(California Water Code Sections 13000 et seq.) to implement and enforce a
program for the regulation of wastewater discharges to the District's sewers.
T. That the District is required by federal, state and local law, to
meet applicable standards of treatment plant effluent quality.
U. That pursuant to these requirements, the Board of Directors
has adopted Ordinance No. OCSD-01, as amended, Establishing Wastewater
Discharge Regulations.
V. That the District incurs additional costs in conducting non-
compliance sampling of those industrial wastewater dischargers who violate the
District's Wastewater Discharge Regulations and in administering the industrial,
wastehauler, and special discharge permit programs.
W. That Ordinance No OCSD-01, as amended, Establishing
Wastewater Discharge Regulations, provides that the Board of Directors is to
establish various fees and charges to recover those costs to the District which
are made necessary by industrial dischargers and wastehaulers who violate the
District's Wastewater Discharge Regulations.
X. That the industrial discharger, source control, and
wastehauler fees and charges hereby established by this Ordinance do not
exceed the estimated reasonable costs to the District of industrial discharger,
source control, or wastehauler use of the District's facilities and for the
administration and implementation of permit and fee processing, non-compliance
WS&S-TLW:pj:188361,v-3:11/02//04 7
sampling, and related services associated with the District's Source Control
Program.
Y. That all fees and charges established herein have been
approved by the District's Board of Directors at a noticed public meeting, all in
accordance with applicable provisions of law.
Z. That the adoption of this Ordinance is statutorily exempt
under the California Environmental Quality Act pursuant to the provisions of
Public Resources Code Section 21080(b)(8) and California Code of Regulations
Section 15273(a).
AA. That each of the Findings set forth in previous Ordinances
Nos. OCSD-05, OCSD-06, OCSD-11, OCSD-13, OCSD-15, OCSD-18,
OCSD-19, OCSD-20, and OCSD-22 are reaffirmed and readopted hereat, except
to the extent that they have been specifically superseded or otherwise amended
by specific Findings herein.
ARTICLE II
SANITARY SEWER SERVICE CHARGES
Section 2.01. Purpose and Scope. The purpose of this Ordinance
is to establish Sanitary Sewer Service Charges required to be paid by property
owners for the services and facilities furnished by the District in connection with
its sanitation treatment works and sewage collection system. Revenues derived
under the provisions of this Ordinance shall be used for the acquisition,
construction, reconstruction, maintenance, and operation of the wastewater
collection, treatment and disposal facilities of the District; to repay principal and
interest on debt instruments; or to repay federal and state loans issued for the
construction and reconstruction of said sewerage facilities, together with costs of
administration and provisions for necessary reserves.
Section 2.02. Annual Sanitary Sewer Service Charge.
Commencing with the effective date of this Ordinance, the owner of each parcel
of real property located within the District which is improved with structures
designed for residential, commercial, or industrial use and which, at the request
of the owner or the owner's predecessor-in-interest, is connected to the District's
system, shall pay an annual Sanitary Sewer Service Charge based on the
respective class of users, in the sum or sums, as set forth in Tables A and B of
this Ordinance, below. The annual Sanitary Sewer Service Charges for
residential users are set forth in Table A. The annual Sanitary Sewer Service
Charges for commercial or industrial users are dependent upon the respective
classifications of property use, determined by reference to Table B; the
applicable percentage figure shown on Table B with respect to the particular use
classification is multiplied by the applicable single family residential rate shown in
WS&S-TLW:pj:188361,v-3:11/02//04 8
Table A, to arrive at the annual Sanitary Sewer Service Charge rate per 1,000
square feet for the commercial or industrial user.
Section 2.03. A. Exemptions. It is the intent of the District that
the legal owner(s) of parcels of real property, otherwise subject to the levy and
payment of the Sanitary Sewer Service Charges, as prescribed herein, be
relieved, in whole or in part, from the payment of said charges, in certain
circumstances and under conditions prescribed herein, and be entitled to either a
rebate or a refund with respect to charges paid, as more specifically set forth in
Subparagraphs 2.03E and 2.03C below, provided an inequity is established or a
billing error is proven, as specified in Subparagraphs B or C.
B. Application for Rebate. Any property owner
may apply to the District for a rebate of Sanitary Sewer Service Charges paid to
the District by establishing that an unfair valuation of the property has been made
by the District. An applicant for a rebate must establish, by proof satisfactory to
the General Manager of the District, or his designee, that an inequity exists
between the amount of the charge paid and the amount of wastewater
discharged to the District's system, resulting in an unfair valuation. Satisfactory
proof shall establish that either:
(1) The principal water use is agricultural or
horticultural; or
(2) The property is devoted to any other use
wherein the amount of wastewater discharged to the District's system is
significantly less on a regular basis than the amount that would normally be
expected to be discharged by the class of property in question.
Satisfactory proof shall include, but not be limited to, documentation
showing actual water usage for each billing cycle during the entire period for
which the rebate is sought.
The amount of any rebate shall not reduce the charge payable by any
property owner, whose property is connected to the District's system, to less than
the single family residential charge shown on the applicable Table attached
hereto.
C. Application for Refund. Any property owner may
apply to the District for a refund of Sanitary Sewer Service Charges paid to the
District by establishing that the amount paid was pursuant to an error in the
amount billed or the amount paid. The applicant for a refund must submit proof
satisfactory to the General Manager of the District, or his designee, that a billing
error has been made by the District, or the County Tax Collector. Such proof
shall include, but not be limited to, proof that:
WS&S-TLW:pj:188361,v-3:11/02//04 9
(1) The owner's parcel of property is not
connected to the District's system; or
(2) The property has not been classified in the
proper land use category; or
(3) A clerical error has been made.
D. Limitations Period. Applications for rebates and
refunds shall be deemed to be governed by the provisions of California Revenue
& Taxation Code Sections 5096 and 5097, allowing for refunds for a period of
four (4) years from the date of payment of the second installment of the bill
claimed to be either inequitable or incorrect.
E. Determination. All applications for rebates or refunds
of the Sanitary Sewer Service Charge will be determined by the General
Manager of the District, or his designee, who, based on the submitted proof, may
grant a full or partial rebate or refund.
F. Administrative Fee. At the time of filing the
application for rebate or refund, the property owner shall pay District an
administrative fee for the processing of such application. The amount of the fee
shall be equal to the total of all fees and charges imposed on the District by any
other public entity, such as the Orange County Tax Collector, the Orange County
Auditor, or the Orange County Recorder, in connection with the rebate or refund.
Section 2.04. Annual Charge Based on Fiscal Year. The Sanitary
Sewer Service Charges established by this Ordinance shall be effective as of
July 1 of each year, as set forth in Tables A and B, attached hereto, for the
District's fiscal year, and shall remain in effect until such time as the rates
adopted herein are changed by District Ordinance. There shall be no proration of
such charges in any fiscal year.
Section 2.05. Method of Collection.
A. Pursuant to the authority granted by California Health &
Safety Code Section 5473, and except as otherwise provided in Subparagraph
2.05B below, all sanitary sewer service charges established herein shall be
collected on the County Tax Roll in the same manner, by the same persons, and
at the same time as, together with, and not separately from, its general taxes.
The County Tax Collector is authorized and hereby ordered to make said
collections in accordance with the terms and conditions of agreements between
the County of Orange and the District.
B. In the event District determines that, due to billing or
payment error, or to inequity in the amount billed, a property owner has
WSBS-TLW:pj:188361,v-3:11/02//04 10
underpaid annual Sanitary Sewer Service Charges payable to District, District,
within four (4) years after the date of mailing of the tax bill, may:
(1) collect the amount of any deficiency directly on the
County Tax Roll,
(2) off-set the amount of any deficiency against any
amounts that District determines is owing, by District, to the property owner, as a
rebate or refund under this Ordinance; or
(3) submit, directly to the property owner, a bill for the
amount of any deficiency, which shall be due and payable within thirty (30) days
of the invoice date and which, if not paid, shall become a lien on said property.
Section 2.06. Credit for Industrial Permittees. A credit shall be
allowed to all dischargers permitted pursuant to Article 3 of District Ordinance
No. OCSD-01, as amended, in an amount equal to the annual Sanitary Sewer
Service Charge established by Section 2.02 of this Ordinance, in the same
manner as credit is allowed for ad valorem taxes pursuant to Sections 302.6(B),
and 303.6(B) of District Ordinance No. OCSD-01, as amended.
TABLE A
ANNUAL SEWER SERVICE USER FEES
RESIDENTIAL USERS
FISCAL YEAR 2003-04 2004-05 2005-06 2006-07 2007-08
SFR $100.00 $115.00 $132.00 $153.00 $175.00
MFR $ 70.00 $ 80.50 $ 92.40 $107.10 $122.50
SFR = SINGLE FAMILY RESIDENTIAL
MFR = MULTI FAMILY RESIDENTIAL
All properties located within Revenue Area No. 14 pay no annual service fees.
District costs relating to providing service to these properties are billed by OCSD
directly to the Irvine Ranch Water District, the local agency providing the local
sewer service.
WS&S-TLW:pj:188361,v-3:11102//04 11
TABLE B
ANNUAL SEWER SERVICE CHARGES
PROPERTY USE CLASSIFICATIONS FOR
COMMERCIAL OR INDUSTRIAL USERS
Percentage of SFR
Assessor Use Code Description Per 1,000 SF or Unit
1 Vacant Land Parcel 0%
5 Common Area Parcel 0%
6 "Hold" Parcel 0%
8 Equivalent to Vacant 0%
121 Parcel of Minimal or No Value 0%
122 Subsurface Parcels 0%
124 Oil/Mineral Rights 0%
125 Mineral Rights Equipment 0%
126 Vacant Comm. Area-IMP Alloc. 0%
201 Homeowners Exemption Addl. 0%
666 Unassigned Vacant 0%
777 Septic Tank Property 0%
112 Steel Building 7%
113 Mini-Warehouse 7%
58 Nurseries (Plants) 10%
100 Drive-In Theater 10%
44 Lumber/Constr. Material Yard 17%
71 Parking Garage 17%
72 Paved Parking Lot 17%
110 Warehouse—Single Tenant 17%
111 Warehouse — Multi Tenant 17%
115 Recreational Vehicle Storage 17%
116 Truck Terminal 17%
33 Church Buildings 20%
94 Department Store 23%
95 Discount Store 23%
96 Unattached Single Store 23%
97 Strip Store 23%
74 Recreational Vehicle Park 27%
36 Financial Buildings 27%
40 Health Club 29%
68 High Rise Office 30%
21 Automobile Dealership 41%
22 Auto Repair Shop 41%
23 Automotive Service 41%
24 Used Car Lot 41%
39 Golf Course 41%
57 Motorcycle/Small Vehicle Building 41%
83 Automotive Service Station 41%
WS&S-TLW:pj:188361,v-3:11/02//04 12
TABLE B (CONTINUED)
ANNUAL SEWER SERVICE CHARGES
PROPERTY USE CLASSIFICATIONS FOR
COMMERCIAL OR INDUSTRIAL USERS
Percentage of SFR
Assessor Use Code Description Per 1,000 SF or Unit
84 Marine Service Station 41%
86 Combin.-Service Station/Convenience 41%
65 Single Office Bldgs. to 3 Stories 41%
66 Small Office Center 41%
67 Office Complex 41%
69 Converted Residence to Office 41%
7 Mobile Home 50%
55 Mobile Home Park 50%
107 Light Industrial —Single Tenant 50%
108 Light Industrial —Multi Tenant 50%
109 Research and Development 50%
114 Industrial Park 50%
37 Fraternal Buildings 51%
101 Unattached Theater 51%
26 Airport and Related Buildings 53%
45 Marinas 53%
88 Low Flow Shopping Center 53%
3 Two or More Residences 70%
10 Duplex Only 70%
11 Triplex Only 70%
12 04-Units Only 70%
13 5 to 16 Units 70%
14 17 to 25 Units 70%
15 26 to 40 Units Only 70%
16 41-99 Units Only 70%
17 100 or More Units 70%
18 Developed with a Mix of Forms 70%
63 Low Rise Retirement Building 70%
64 High Rise Retirement Building 70%
81 Pre-Schools, Nursery or Care 82%
82 Private Schools 82%
98 Store with Offices or Living Quarter 82%
99 Store with Office Upstairs 82%
118 Governmental Use Vacant/Develop. 82%
19 SFR with 1 or 2 rental units 85%
34 Dormitory 97%
42 Hospital 97%
43 Hotel 97%
56 Motels and Motor Hotels 97%
WS&S-TLW:pj:188361,v-3:11/02//04 13
TABLE B (CONTINUED)
ANNUAL SEWER SERVICE CHARGES
PROPERTY USE CLASSIFICATIONS FOR
COMMERCIAL OR INDUSTRIAL USERS
Percentage of SFR
Assessor Use Code Description Per 1,000 SF or Unit
0 Conversion-C/1, Rural PC 100%
2 One Residence 100%
4 Miscellaneous Improvement 100%
85 Comb. Serv. Stn./Restaurant 100%
103 Chemical Tank and Bulk Storage 100%
104 Food Processing Plant 100%
105 Cold Storage Plant 100%
106 Factory 100%
119 Public Utility 100%
120 Water Mutual or Company 100%
888 Conversion-Composite Prop. 100%
32 Cemetery & Related Buildings 101%
38 Funeral Home 101%
60 Nursing Home 102%
61 Convalescent Hospitals 102%
62 Converted Res. Used as Nursing 102%
28 Bowling Alleys 112%
92 Skating Rinks 112%
50 Single Medical Bldgs. to 3 Stories 124%
51 Small Medical Center 124%
52 Medical Center Complex 124%
53 High Rise Medical 124%
54 Converted Residence to Medical 124%
89 Average Flow Shopping Center 139%
20 Amusement Parks 144%
35 Entertainment Center 144%
73 Recreation 144%
30 Coin Operated Car Wash 151%
47 Supermarket 151%
48 Convenience Market 151%
90 High Flow Shopping Center 226%
76 Restaurant—Take Out 300%
77 Restaurant—Coffee Shop 600%
78 Restaurant— Dinner House 600%
79 Restaurant— Conversion from SF 600%
29 Conventional Car Wash 796%
NOTE: Multiply the Table A Single Family Residential Rate by the percentage figure above
in order to determine the rate per 1,000 square feet for the commercial or industrial user.
WS&S-TLW:pj:188361,v-3:11/02//04 14
ARTICLE III
CAPITAL FACILITIES CAPACITY CHARGES
Section 3.01. Purpose and Scope. The purpose of this Ordinance
is to impose Capital Facilities Capacity Charges when properties, either newly-
connect to the District's system, or expand the use of the property previously
connected to the District. Revenues derived under the provisions of this
Ordinance will be used for the acquisition, construction, and reconstruction of the
wastewater collection, treatment and disposal facilities of the District; to repay
principal and interest on debt instruments; or to repay federal or state loans for
the construction and reconstruction of said sewerage facilities, together with
costs of administration and provisions for necessary reserves.
Section 3.02. Definitions.
A. "Actual construction costs" include the cost of all activities
necessary or incidental to the construction of a District facility, such as financing,
planning, designing, acquisition of the property or interests in the property,
construction, reconstruction, rehabilitation, and repair.
B. "Capital Facilities Capacity Charge" means a one-time, non-
discriminatory charge imposed at the time a building or structure is newly
connected to the District's system, directly or indirectly, or an existing structure or
category of use is expanded or increased. Said charge is to pay for District
facilities in existence at the time the charge is imposed, or to pay for new facilities
to be constructed in the future, that are of benefit to the property being charged.
This charge does not apply to temporary facilities or operations that are regulated
under the provisions of a Special Purpose Discharge Permit.
C. "Connection fee" means a fee equal to the cost necessary to
physically connect a property to the District's system, including but not limited to,
installation of meters, meter boxes, pipelines, and appurtenances to make the
connection and which fee does not exceed the actual cost of labor, materials,
and overhead for the installation of those facilities.
D. "Non-discriminatory" means that the Capital Facilities
Capacity Charge does not exceed an amount determined on the basis of the
same objective criteria and methodology applicable to comparable public or non-
public users, and is not in excess of the proportionate share of the cost of the
District's facilities of benefit to the person or property being charged, based upon
the proportionate share of use of those facilities.
WS&S-TLW:pj:188361,v-3:11/02//04 15
E. "Public agency" means the United States or any of its
agencies, the State or any of its agencies, the Regents of the University of
California, a county, city, district, school district, local or regional public authority,
or any other political entity, subdivision or public corporation of the State.
F. The Supplemental Capital Facilities Capacity Charge, as
provided for in Sections 3.07, 3.08, 3.09, and 3.10 of this Ordinance, is an annual
charge payable to the District on a quarterly or annual basis, as determined by
the District. Said charge is required to be paid by dischargers that exceed the
maximum quantity of flow or constituents (BOD or SS) allowed as a base use for
which the CFCC is paid.
Section 3.03. Connection Permits: Required.
A. Connection permits are required of each and every dwelling
unit, and each commercial or industrial building, and structure connecting directly
or indirectly to the District's sewerage system facilities. Included are the
connections of laterals to local municipal sewerage facilities, and the connection
of local municipal sewerage facilities and laterals to the District's facilities.
Multiple detached structures on a single parcel of property shall each be required
to obtain a connection permit.
B. Except as authorized by the issuance of a Special Purpose
Discharge Permit under Sections 305 — 305.6 of Ordinance No. OCSD-01, or as
amended, or as authorized pursuant to a special extra territorial service
agreement approved by the Board of Directors, no permit shall be valid unless
the real property to be served by use of the permit is included within the
boundaries of the District and within the boundaries of a local sewering agency
authorized to maintain public sewering facilities. However, a permit, as
authorized above, may be issued for property to be served outside the
boundaries of a local sewering agency if a local sewering agency makes
application for the issuance of such permit.
There will be a non-discriminatory Capital Facilities Capacity Charge
assessed to public agencies for connecting directly or indirectly to the District's
sewerage system facilities, and a connection permit must be obtained.
Section 3.04. Capital Facilities Capacity Charge: Payment
Required. No application for a permit for a connection of a structure to a District
sewerage facility, or to any sewerage facility which discharges into a District
sewerage facility, shall be approved, nor a permit issued, until a District Capital
Facilities Capacity Charge is paid by the applicant, except as provided for
discharges under a Special Purpose Discharge Permit. No connection permit
shall be issued unless there is an established category of use of the property to
be served or a valid building permit issued which establishes the category of use
of said property.
WS&S-TLW:pj:188361,v-3:11/02//04 16
Section 3.05. Capital Facilities Capacity Charqe: Time of Payment.
A. Payment of the Capital Facilities Capacity Charge
established by this Ordinance for connection to the District's sewerage system
facilities shall be required at the time of issuance of the building permit for all
construction within the District, excepting in the case of a building legally exempt
from the requirement of obtaining a permit. The payment of the Capital Facilities
Capacity Charge for such exempt buildings will be required at the time of and
prior to the issuing of a plumbing connection permit for any construction within
the territorial limits of the District, or if none, prior to the issuance of a Certificate
of Occupancy.
B. Upon application of any property owner seeking to connect
to the District's system, the Board of Directors of District, in its sole and absolute
discretion and upon a finding of compelling need, may, pursuant to the authority
of California Health & Safety Code Section 5474, approve of an agreement with
the property owner for the payment of the applicable connection charge in
installments over a period of not to exceed five (5) years, bearing an interest rate
on the unpaid balance of not to exceed ten (10%) percent per annum, and that
the charges and interest shall constitute a lien on the property.
Section 3.06. Capital Facilities Capacity Charge. Schedule of
Amounts. Every person or entity connecting any new or expanded building or
structure to the District's system facilities shall pay a Capital Facilities Capacity
Charge in the amount for the applicable category of use set forth on Table C,
below.
WS&S-TLW:pj:188361,v-3:11/02//04 17
r
TABLE C
CAPITAL FACILITIES CAPACITY CHARGES
Use Category Rate Basis Base Charge
Commercial — Industrial Per 1,000 square feet'
Low Demand' Per 1,000 square feet $ 170.001
Average Demand` Per 1,000 square feet $1,050.001
High Demand Per 1,000 square feet $2,490.001
Single Family Residential (SFR) * % of Base Base Charge
5+ Bedrooms (Per Unit) 1.39 $4,020.00
4 Bedrooms (Per Unit) 1.19 $3,440.00
3 Bedrooms (Per Unit) 1.00 (Base) $2,890.00
2 Bedrooms (Per Unit) 0.81 $2,340.00
1 Bedroom (Per Unit) 0.62 $1,790.00
Multi-Family Residential (MFR) * % of Base Base Charge
4+ Bedrooms (Per Unit) 1.08 $3,120.00
3 Bedrooms (Per Unit) 0.89 $2,570.00
2 Bedrooms (Per Unit) 0.70 $2,020.00
1 Bedroom (Per Unit) 0.50 $1,450.00
Studio (Per Unit) 0.32 $ 920.00
Supplemental CFCC for Permit Users, includes 5% cost of funds.
Flow, gallons per day $0.001001
BOD, pounds per day $0.289100
SS, pounds per day $0.187150
'Provided that the minimum Capital Facilities Capacity Charge for such new construction shall be
$2,890.00; and all calculations shall be on a 1,000 square foot, or portion thereof, basis.
A schedule of the Capital Facilities Capacity Charges specified herein will be on file in the Office
of the Board Secretary of the District, and in the Building Department of each City within the
District.
'Low Demand connections are the following categories of Users: Nurseries; Warehouses;
Parking Structures; RV Storage; Churches; Truck Terminals; RV Parks; Lumber/Construction
Yards; and other dischargers whose flow is similar in volume to these listed categories.
3High Demand connections are the following categories of users: Restaurants, Supermarkets;
Car Washes; Coin Laundries; Amusement Parks; Shopping Centers with Restaurants; Food
Processing Facilities; Textile Manufacturers; and other dischargers whose flow is similar in
volume to these listed categories.
4All other connections are Average demand users.
*SFR—The rates for each size of SFR and MFR are established with a 3-bedroom SFR having a
base of 1.0, and all others are a relative percentage higher or lower than 1.0, depending on size
of unit, as noted.
WS&S-TLW:pj:188361,v-3:11/02//04 18
Section 3.07. Supplemental Capital Facilities Capacity Charge:
Significant Commercial — Industrial Users and Special Purpose Dischargers —
Definitions.
A. A Significant Commercial — Industrial User ("SCIU") is any
person or entity who discharges commercial or industrial process flow, but
excluding domestic sewage flow, in an amount greater than 25,000 gallons per
day ("gpd"), or Biochemical Oxygen Demand ("BOD") greater than 150 pounds
per day, or Suspended Solids ("SS") greater than 150 pounds per day, or who is
required to obtain a Waste Discharge Permit, as prescribed by Ordinance No.
OCSD-01, as amended, Article 3, due to having federally or District regulated or
significant discharges.
B. A special purpose discharger ("SPD") is any person or entity
who discharges to the sewer system wastewater or process flow in an amount
greater than 25,000 gpd (excluding domestic, industrial or commercial) and who
is required to obtain a Special Purpose Discharge Permit as prescribed in
Section 305 of Ordinance No. OCSD-01 or its successor.
C. An Existing SCIU or SPD is any SCIU or SPD connected
and discharging to the District's system prior to January 1, 2000.
D. A New SCIU or SPD is any user who connects and
discharges to the District's system pursuant to a Waste Discharge Permit issued
on or after January 1, 2000; or if previously connected and not an SCIU, as
defined in Subparagraphs 3.07A and B above, but, subsequent to January 1,
2000, increases flow, or BOD, or SS to a level as to constitute an SCIU or SPD.
E. The maximum discharge allowed to a user, for which a base
Capital Facilities Capacity Charge is paid, as per Table C, above, is 25,000
gallons per day ("gpd"), or 150 pounds each of BOD and SS (the "base use").
Discharge of flow, or BOD, or SS in amounts greater than allowed by this
Subsection 3.07E shall be subject to the provisions of Sections 3.08 and 3.09
hereof.
F. Each Existing SCIU shall have a baseline of allowed
discharge of flow, and BOD, and SS established by the District as of January 1,
2000. The baseline shall be based upon the discharge for Fiscal Year 1998-99,
or upon such other discharge data which the District determines is representative
of the user's actual annual discharge to the sewerage system. Dischargers who
are deemed to be SCIU's solely because of the requirements to obtain a Waste
Discharge Permit, pursuant to Section 3.07A above, shall have a minimum
baseline established as follows: Flow— 25,000 gallons per day; BOD — 150
pounds per day; and SS — 150 pounds per day. The SCIU shall be authorized to
discharge flow, and BOD, and SS up to the baseline amounts without payment of
a Supplemental Capital Facilities Capacity Charge.
WS&S-TLW:pj:188361,v-3:11/02//04 19
G. Each Existing SPD shall have a baseline of 25,000 gpd, 150
pounds per day of BOD and 150 pounds of SS. The Existing SPD shall be
authorized to discharge flow up to 25,000 gpd without payment of a
Supplemental Capital Facilities Capacity Charge.
H. The Supplemental Capital Facilities Capacity Charge, as
prescribed by Sections 3.08, 3.09, and 3.10 below, shall be payable commencing
with the effective date of this Ordinance.
I. Within two (2) years from the date of the District's written
notice to the existing SCIU of its baseline amounts, the existing SCIU, as
described in Section 3.07C, shall have a right to appeal the District's established
baseline for the SCIU. The appeal shall be to the General Manager, or his
designated representative, who shall have discretion, based upon extraordinary
circumstances, wherein the established baseline is not representative of the
historical average daily discharge by the SCIU for a yearly period, to modify the
baseline amounts for the current year, or on a permanent basis, subject to terms
and conditions as prescribed by the General Manager. The decision of the
General Manager shall be final.
Section 3.08. Supplemental Capital Facilities Capacity Charge: New
Significant Commercial — Industrial Users. In addition to the base Capital
Facilities Capacity Charge, as prescribed in Table C, for commercial — industrial
use category properties, all New SCIU's shall pay a Supplemental Capital
Facilities Capacity Charge for each gallon of flow, or pound of BOD, or SS,
exceeding the base use discharge maximums, in the amount shown in Table D.
Section 3.09. Supplemental Capital Facilities Capacity Charge:
New Special Purpose Dischargers. All New SPDs shall pay a Supplemental
Capital Facilities Capacity Charge of $0.001001 per gallon per day for each
gallon of flow exceeding 25,000 gallons per day. Upon issue of permission to
discharge, SPD with discharges above 25,000 gpd shall pay a nonrefundable
Supplemental Capital Facilities Capacity Charge, prior to discharge, for one
million gallons above 25,000 gpd. The deposit will be credited by the District
against future Supplemental Capital Facilities Capacity Charges.
Section 3.10. Supplemental Capital Facilities Capacity Charge:
Existing Significant Commercial — Industrial Users and Special Purpose
Dischargers.
A. All Existing Significant Commercial — Industrial Users
connected to and discharging to the District's system shall be required to pay a
Supplemental Capital Facilities Capacity Charge upon the occurrence of either (i)
an increase of discharge flow of 25,000 gallons per day ("gpd"), or 25% per day
over its established baseline authorization, whichever is lesser; or (ii) an increase
WS&S-TLW:pj:188361,v-3:11/02//04 20
3
of either BOD or SS discharge of 150 pounds each per day, or 25% each per
day, whichever is lesser, over its established baseline authorization.
B. The Supplemental Capital Facilities Capacity Charge shall
be in the following amounts for each component that is increased as provided in
Section 3.10A above:
TABLE D
SUPPLEMENTAL CAPITAL FACILITIES CAPACITY CHARGES
Daily Charge
Flow Gallons Per Day $0.001001
BOD Pounds Per Day $0.289100
SS Pounds Per Day $0.187150
C. All Existing SPDs connected and discharging to the sewer
shall be required to pay a Supplemental Capital Facilities Capacity Charge upon
occurrence of an increase of discharge flow over 25,000 gpd. The Supplemental
Capital Facilities Capacity Charge shall be $0.001001 per gallon per day of
discharge for each gallon above 25,000 gpd.
D. The Supplemental Capital Facilities Capacity Charge shall
be calculated on the basis of the average daily quantity of discharge in excess of
the User's baseline or 25,000 gpd for SPDs. The daily averages will be based on
the daily discharges for a year, utilizing discharge records and reports of the
District.
Section 3.11. Capital Facilities Capacity Charge: Replacement
Structures. For new construction replacing former structures, the Capital
Facilities Capacity Charge shall be calculated and paid to the District on the rate
basis of the category of the new use and the amounts as set forth in Table C,
less a credit amount, up to the amount of the new Capital Facilities Capacity
Charge, equal to a charge, as prescribed in Table C that would be for the prior
category of use which was terminated and removed.
Section 3.12. Capital Facilities Capacity Charge: Remodeled
Structures. In the case of existing structures connected to the District's system
facilities, to which new construction or alteration is made to change or increase
the category of use, a Capital Facilities Capacity Charge shall be calculated and
paid to the District on the rate basis of the category of the new use and the
amounts as set forth in Table C, less a credit amount, up to the amount of the
WS&S-TLW:pj:188361,v-3:11/02//04 21
new Capital Facilities Capacity Charge, equal to a charge, as prescribed in Table
C for the prior category of use.
Section 3.13. Payment of Capital Facilities Capacity Charge: Off-
Site Sewers Not Part of Master Plan Relative to Reimbursement Agreements. A
charge for connection to off-site sewers which are not included as part of the
District Master Plan and for which a Non-Master Plan Reimbursement
Agreement has been entered into between the District and the property owner,
shall be paid in the amount provided for in said Agreement, to be known as a
Non-Master Plan Capital Facilities Capacity Charge. The amount set forth in
said Agreement shall be the amount due, provided the original Agreement is still
in force. The Non-Master Plan Capital Facilities Capacity Charge shall be in
addition to the other Capital Facilities Capacity Charges provided for in Sections
3.06 through 3.10 hereinabove, established for property connecting to said
facilities.
Section 3.14. No Refund or Transfer. A Capital Facilities Capacity
Charge is paid for the connection of a specific building or structure on a parcel of
property. No refund of any charge shall be made because of non-use or change
of use, or any other reason. The connection permit is non-transferable to any
other parcel of property.
Section 3.15. Baseline Transferability. The baseline of allowed
discharge of flow, BOD and SS used to calculate a Supplemental Capital
Facilities Capacity Charge shall not be transferable, nor shall a credit for such
previously existing baseline be provided to another SCIU concurrently or
subsequently occupying the same property. Each such SCIU shall pay
Supplemental Capital Facilities Capacity Charges in accordance with Section
3.08 above.
WSBS-TLW:pj:188361,v-3:11/02//04 22
ARTICLE IV
MISCELLANEOUS CHARGES AND FEES RELATING
T O INDUSTRIAL DISCHARGERS, SOURCE CONTROL
PERMITTEES AND WASTEHAULERS
Section 4.01. Purpose and Scope. The purpose of this Ordinance
is to recover those costs incurred by the District (i) on account of industrial
dischargers' and wastehaulers' use of the District's facilities; (ii) when
administering the District's Source Control Program; and (iii) when performing
non-compliance sampling of industrial wastewater dischargers who have violated
the District's Wastewater Discharge Regulations or the terms and conditions of
the discharger's permit. Revenues derived under the provisions of this
Ordinance shall be used to defray the costs incurred by the District (i) on account
of such use of the District's facilities; and (ii) in performing these tasks.
Section 4.02. Administrative Fees and Charges Relating to
Permittees. Administrative fees and charges relating to permittees are hereby
established in the sum or sums as set forth in Table E, below.
Section 4.03. Source Control Non-Compliance Fees. Source
control non-compliance fees are hereby established for dischargers' non-
compliance sampling and for self-monitoring and data reporting non-compliance,
in the sum or sums as set forth in Table F, below.
Section 4.04. Special Purpose Discharge Permittees; Charges for
Use. As authorized by Sections 305.5 and 305.6 of the District's Wastewater
Discharge Regulations adopted by Ordinance No. OCSD-01, as amended,
charges for use are hereby established for Special Purpose Discharge
Permittees, as set forth in Table G, below
Section 4.05. Class I and Class II Permittees — Charges for Use.
As authorized by Sections 302.3, 302.6, 303.3 and 303.6 of the District's
Wastewater Discharge Regulations adopted by Ordinance No. OCSD-01, as
amended, the charges for use are hereby established for Class I and Class II
Permittees as set forth in Table G, below.
Section 4.06. Wastehauler Charges for Use. As authorized by
Sections 306.3 and 306.7 of the District's Wastewater Discharge Regulations
adopted by Ordinance No. OCSD-01, as amended, the charges for use are
hereby established for wastehaulers as set forth in Table H, below.
WS&S-TLW:pj:188361.v-3:11l02!!04 23
T
f
Section 4.07. Administrative Appeals.
A. Any user, permit applicant, or permittee affected by any
decision, action, or determination by the District may, within forty-five (45) days of
the date of mailing by the District of the initial invoice for fees imposed pursuant
to this Ordinance, request that the District reconsider imposition of such fees.
Following review of such a request, the District shall notify the user, permit
applicant, or permittee by certified mail of the District's decision on the
reconsideration request.
B. Any user, permit applicant, or permittee adversely affected
by the District's decision on the reconsideration request, may file an appeal in
accordance with Sections 617 and 619 of the District's Wastewater Discharge
Regulations Ordinance No. OCSD-01, as amended.
WS&S-TLW:pj:188361,v-3:11/02//04 24
TABLE E
ADMINISTRATIVE FEES AND CHARGES
RELATING TO PERMITTEES
Permit Fees Charges
A. Class I Wastewater Discharge Permit $335.00/year
B. Class II Wastewater Discharge Permit $70.00/year
C. Special Purpose Discharge Permit $250.00/year
- One-Time Application $975.00/permit
- Nonrefundable Deposit for First One Million
Gallons — New Permit Only $368.58
D. Wastehauler Discharge Permit $75.00/year
Wastehauler Fees Charges
F. Permit Decal Initial Issue $25.00
G. Permit Decal Replacement $50.00
H. Entry Card Initial Issue $50.00
I. Entry Card Replacement $100.00
J. After Hours Discharge — Prearranged $85.00/event
K. After Hours Discharge — Emergency $100.00/event
Administrative/Processing Fees Charges
L. District's Collection of Tax Data $100.00/permit
M. District's Collection of Water Consumption Data $100.00/permit
N. Appeal Hearing Filing Fee $400/appeal
WS&S-TLW:pj:188361,v-3:11/02//04 25
r
TABLE F
INDUSTRIAL DISCHARGER, SOURCE CONTROL
AND NON-COMPLIANCE SAMPLING FEES
Charge
Cost of Processing and Sampling
Following a Minor Violation $225.00/event
Cost of Processing and Sampling
Following a Major Violation $500.00/event
Cost of Analysis Charge
Heavy Metals: $35.00/each
- Aluminum
- Antimony
- Arsenic
- Cadmium
- Chromium
- Copper
- Gold
- Lead
- Molybdenum
- Nickel
- Palladrum
- Platinum
- Selenium
- Silver
-Thallium
- Zinc
Mercury $78.00
601/602 $152.00
604 $223.00
606 $254.00
608 $523.00
610 $73.00
WS&S-TLW:pj:188361,v-3:11/02//04 26
TABLE F (CONTINUED)
INDUSTRIAL DISCHARGER, SOURCE CONTROL
AND NON-COMPLIANCE SAMPLING FEES
Charge
612 $200.00
624 $355.00
625 $661.00
Ammonia Analysis as Nitrogen $ 21.00
Biochemical Oxygen Demand (BOD) $ 44.00
BOD and Suspended Solids (SS) Analysis $ 67.00
Chemical Oxygen Demand $ 44.00
Conductivity $ 15.00
Cyanide (Amenable) $ 70.00
Dissolved Mineral Solids $ 15.00
Gamma Radiation Determination $115.00
Gross Alpha and Beta Determination $ 50.00
Tritium Determination $ 50.00
Oil & Grease (Hexane Soluble Matter) $ 74.00
Oil & Grease (Mineral Partition) $ 74.00
Total Organic Nitrogen $ 48.00
pH $ 8.00
Fluoride $ 51.00
Suspended Solids (Total) $ 23.00
Suspended Solids (Total and Volatile) $ 44.00
Total Dissolved Solids $ 14.00
Total Sulfides $ 29.00
SELF-MONITORING AND DATA REPORTING
NON-COMPLIANCE
Cost of Processing and Issuing Significant
Non-Compliance Notification $165.00
Cost of Processing Annual SNC and Publication $260.00
WS&S-TLW:pj:188361,v-3:11/02//04 27
T
TABLE G
CLASS I AND CLASS II PERMITTEES AND
SPECIAL PURPOSE DISCHARGE PERMITTEES
CHARGES FOR USE
Class I and II
Permit User FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 FY 2007-08
Flow (*) $316.38 $577.30 $637.55 $711.27 $773.32
B.O.D. (**) $216.13 $270.68 $288.50 $311.21 $330.53
S.S. (***) $207.35 $414.27 $432.14 $454.19 $473.50
Domestic
Equivalent $100.00 $115.00 $132.00 $153.00 $175.00
Special Purpose
Discharge
Permit FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 FY 2007-08
Flow(*) $316.38 $577.30 $637.55 $711.27 $773.32
B.O.D. (**) $216.13 $270.68 $288.50 $311.21 $330.53
S.S. (***) $207.35 $414.27 $432.14 $454.19 $473.50
Domestic
Equivalent $100.00 $115.00 $132.00 $153.00 $175.00
(*) Flow Per million gallons of Flow
(**) B.O.D. Per thousand pounds of Biochemical Oxygen Demand
(***) S.S. Per thousand pounds of Suspended Solids
All properties located within Revenue Area No. 14 pay no annual service fees. District costs
relating to providing service to these properties are billed by OCSD directly to the Irvine Ranch
Water District, the local agency providing the local sewer service.
WS&S-TLW:pj:188361,v-3:11/02//04 28
TABLE H
WASTEHAULER CHARGES FOR USE
Wastehauler Fees Charges
Charge for Use —Waste originating $0.035/gallon of
within Orange County truck capacity
Charge for Use —Waste originating $0.11/gallon of
outside Orange County truck capacity
WS&S-TLW:pj:188361,v-3:11/02/104 29
ARTICLE V
MISCELLANEOUS
Section 5.01. Application of Ordinance. The provisions of this
Ordinance shall be in addition to the provisions of District Ordinance No. OCSD-
01, as amended, Establishing Wastewater Discharge Regulations for Use of
District's Sewage Facilities, including provisions for payment of charges or fees
related thereto; District Ordinance No. OCSD-21, as amended, Establishing Fees
Concerning Annexations of Territory to the District; and any other District
Ordinances and Resolutions not in conflict herewith.
Section 5.02. Exceptions. The provisions of this Ordinance shall
apply to all owners of properties within the District, including those properties
otherwise deemed exempt from payment of taxes or assessments by provisions
of the State Constitution or statute, including properties owned by other public
agencies or tax-exempt organizations, except as expressly provided herein.
The Board of Directors of the Orange County Sanitation District does further
hereby ORDAIN:
Section II. Severability. If any provision of this Ordinance, or the application to any
person or circumstances is held invalid by order of Court, the remainder of the
Ordinance, or the application of such provision to other persons or other
circumstances, shall not be affected.
Section III. Effective Date. This Ordinance shall take effect January 1, 2005.
Section IV. Repeal. Ordinance No. OCSD-22 is hereby repealed.
Section V. Certification and Publication. The Secretary of the Board shall certify to the
adoption of this Ordinance, and shall cause a summary to be published in a
newspaper of general circulation as required by law.
H
H
H
WS&S-TLW:pj:188361,v-3:11/02//04 30
PASSED AND ADOPTED by a vote of not less than two-thirds of the
Board of Directors of the Orange County Sanitation District at a Regular Meeting
held
CHAIR, BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
ATTEST:
SECRETARY, BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
THOMAS L. WOODRUFF
DISTRICT GENERAL COUNSEL
WS&S-TLW:pj:188361,v-3:11/02//04 31
OMTS COMMITTEE Meeting Date To Bd.of Dir.
10/06/04 11/17/04
AGENDA REPORT Item Number Item Number
OMTSO4-51 16
Orange County Sanitation District
FROM: Robert P. Ghirelli, D.Env., Director of Technical Services
Originator: Mahin Talebi, Source Control Manager
SUBJECT: Ordinance No. OCSD-25, Adopting Fats, Oils, and Grease Control
Regulations Applicable to Food Service Establishments for the City of
Tustin and Unincorporated Area above Tustin — First Reading
GENERAL MANAGER'S RECOMMENDATION
Adopt Ordinance No. OCSD-25, An Ordinance of the Board of Directors of Orange
County Sanitation District. Adopting Fats, Oils and Grease Control Regulations
Applicable to Food Service Establishments.
SUMMARY
Staff is presenting Ordinance No. OCSD-25, regarding Fats, Oils, and Grease Control
Regulations applicable to food service establishments for the City of Tustin and the
unincorporated area north of Tustin and seeking the committee's recommendation to
proceed with the first reading for adopting Ordinance No. OCSD-25, on October 27,
2004. The second reading and final adoption by the Board of Directors is anticipated in
November 2004.
FOG Control Ordinance
• Under sewer service agreements dating back to the 1980's, OCSD owns and
operates the local sewers in Tustin and the unincorporated area north of Tustin. As
the local sewer authority, the District is responsible for the FOG Control Program in
these areas.
• The Regional Water Quality Control Board requires the District to execute a FOG
Ordinance by December 30, 2004. Staff is presenting the draft Ordinance for initial
consideration. The Core Elements of the proposed Ordinance include permitting,
kitchen BMPs and grease interceptor requirements, monitoring, and enforcement
provisions. Staff believes that the proposed Ordinance will enable the District to
implement an economically feasible, practical, and effective FOG Control Program
for about 250 food service establishments (FSEs) in the Tustin area.
■ The proposed Ordinance provides a flexible approach based on a case-by-case
evaluation at each FSE before installation of a grease inceptor is required. It also
includes provisions to issue waivers to de minimis FOG dischargers and variances
to those that provide equivalent alternative technology for controlling FOG
discharges.
■ Initial outreach to FSEs was conducted during the FOG characterization phase,
when FSEs were inspected and informed about the upcoming FOG Control
Program. Staff briefed the Tustin City Council about the program on August 2. 2004.
The District also held a workshop in Tustin on August 3, 2004, to inform restaurant
owners about the Ordinance and to solicit their comments.
■ On September 1. 2004, staff informed this committee about the proposed Ordinance
and its intent to pursue the adoption of the Ordinance. On September 3, 2004, staff
mailed to the FSEs the Ordinance and fact sheets that summarize the core elements
of the Ordinance in layman's language. To date, a few comments have been
received. After reviewing these comments, staff is not recommending any changes
to the Ordinance. Staff is planning additional outreach activities before the adoption
of the Ordinance in November 2004.
■ Barring any unforeseen complications, the second reading (and adoption) will occur
in November, and the Ordinance will be published 15 days after it has been adopted
and become effective in December.
■ After adoption of the Ordinance No. OCSD-25, staff will recommend a fee resolution
for both permit and non-compliance fees (estimated at $100 each) to this committee.
PRIOR COMMITTEE/BOARD ACTIONS
NONE
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
Not applicable (information item)
ADDITIONAL INFORMATION
In April 2002, the Santa Ana California Regional Water Control Board (Regional Board)
issued Order No. R8-2002-0014, General Waste Discharge Requirements (WDR),
requiring Orange County cities and sewering agencies under the jurisdiction of the
Regional Board to monitor and control sewer spills and to prepare and implement FOG
Control Programs by December 30, 2004. The District was named as one of the
co-permittees and also designated as a facilitator for the regional effort to coordinate the
development of the programs and implementation.
Page 2
3
t
Following the promulgation of the Order, the co-permittees determined that the interests
of the county would best be met by conducting a comprehensive FOG Control Study to
establish the technical, administrative, and ordinance building blocks of such a program,
while providing a regional, practical, and equitable approach throughout Orange County.
Staff and co-permittees agreed to conduct the study in two phases.
Phase I ended in June 2003, and resulted in a draft Phase I report, which identified 12
programmatic building blocks for an effective FOG Control Program. The study also
identified regional issues and three newer technologies that must be addressed in
Phase II of the FOG Control Study before the report can be finalized.
In July 2003, the Board authorized staff to enter into an agreement to conduct Phase II
of the FOG Control Study and to enter into agreements with the other co-permittees to
fund the study by using a fair-share formula based on population. The District also
received a Proposition 13 grant to help offset some of the cost of Phase II.
In addition to the regional efforts, the District is also preparing the FOG Control Program
for the sewer systems in the City of Tustin and the unincorporated area above Tustin,
which are owned and operated by the District.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
N/A
Page 3
t
ORDINANCE NO. OCSD-25
ADOPTING FATS, OILS AND GREASE CONTROL REGULATIONS
APPLICABLE TO FOOD SERVICE ESTABLISHMENTS
AN ORDINANCE OF THE BOARD OF DIRECTORS OF ORANGE
COUNTY SANITATION DISTRICT ADOPTING FATS, OILS AND
GREASE CONTROL REGULATIONS APPLICABLE TO FOOD SERVICE
ESTABLISHMENTS
WHEREAS, pursuant to the County Sanitation District Act, Health & Safety Code
§§4700 et seq., the Orange County Sanitation District ("District") has the authority to
adopt ordinances relating to the provision of sewer services and facilities, and
regulations of those services and facilities; and
WHEREAS, the Regional Water Quality Control Board ("RWQCB") for the Santa
Ana Region adopted Order R8-2002-0014, which prescribes general waste discharge
requirements prohibiting sanitary sewer overflows ("SSOs") by sewer collection
agencies; and
WHEREAS, in Order R8-2002-0014, the RWQCB found that one of the leading
causes of SSOs within the Santa Ana Region, which encompasses the District's service
area is "grease blockages;" and
WHEREAS, SSOs often caused by discharge of wastewater containing high
levels of fat, oils and grease (`FOG"), suspended solids, pathogenic organisms, and
other pollutants, may cause temporary exceedances of applicable water quality
objectives, pose a threat to the public health, adversely affect aquatic life, and impair the
public recreational use and aesthetic enjoyment of surface waters within the District's
service area; and
WHEREAS, the 2000-2001 Orange County Grand Jury ("Grand Jury") conducted
a survey among 35 wastewater collection and treatment agencies in Orange County and
concluded that one of the leading causes of SSOs and sewage spills is sewer lines
clogged from the accumulation of FOG discharged from Food Service Establishments;
and
WHEREAS, the Grand Jury further concluded that more effective methods of
minimizing grease discharges into the sewer system must be developed and
implemented to reduce the discharge of FOG to the sewer system in order to prevent
sewer blockages and SSOs; and
WHEREAS, Order No. R8-2002-0014 requires the District to monitor and control
SSOs and to develop a FOG Control Program by December 30, 2004; and
WHEREAS, in light of the overwhelming evidence that FOG is a primary cause of
SSOs, the District desires to implement a FOG Control Program to prevent SSOs; and
ws&s-0xs:pi:#189145:08/06/(9 1
WHEREAS, Section 1014 of the 2001 California Plumbing Code, applicable to all
occupancies in the State pursuant to the California Building Standards Law, requires the
installation of grease traps or interceptors when in the opinion of the Building Official
waste pretreatment is required; and
WHEREAS, the foregoing findings indicate that a FOG Control Program is
required for Food Service Establishments within the District's jurisdiction to comply with
waste discharge regulations and prevent the harmful effects of SSOs; and
WHEREAS, the regulations adopted herein will require existing Food Service
Establishments to install grease control devices or interceptors no later than three years
from the effective date of this Ordinance, and the Board finds that three years is a
reasonable amortization period for existing Food Service Establishments that are
operating without a grease control device or grease interceptor; and
WHEREAS, the Board of Directors finds that specific enforcement provisions
must be adopted to govern discharges of wastewater to the District's system by Food
Service Establishments.
NOW, THEREFORE,the Board of Directors does hereby ordain as follows:
ws&s-0x5:pi:#189145:08/06/04 2
ARTICLE 1 - GENERAL PROVISIONS
1.1 PURPOSE AND POLICY
A. The purpose of this Ordinance is to facilitate the maximum beneficial
public use of the District's sewer services and facilities while preventing
blockages of the sewer lines resulting from discharges of FOG to the
sewer facilities, and to specify appropriate FOG discharge requirements
for Food Service Establishments.
B. This Ordinance shall be interpreted in accordance with the definitions set
forth in Section 1.2. The provisions of this Ordinance shall apply to the
direct or indirect discharge of all wastewater or waste containing FOG
carried to the sewer facilities of the District.
C. To comply with Federal, State, and local policies and to allow the District
to meet applicable standards, provisions are made in this Ordinance for
the regulations of wastewater or waste containing FOG discharges to the
sewer facilities.
D. This Ordinance establishes quantity and quality standards on all
wastewater and/or waste discharges containing FOG, which may alone or
collectively cause or contribute to FOG accumulation in the sewer
facilities causing or potentially causing or contributing to the occurrence of
SSOs.
1.2 DEFINITIONS
A. Unless otherwise defined herein, terms related to water quality shall be as
adopted in the latest edition of Standard Methods for Examination of
Water and Wastewater, published by the American Public Health
Association, the American Water Works Association and the Water
Environment Federation. The testing procedures for waste constituents
and characteristics shall be as provided in 40 CFR 136 (Code of Federal
Regulations).
B. Other terms not herein defined are defined as being the same as set forth
in the latest adopted applicable editions of the California Codes
applicable to building construction adopted pursuant to the California
Building Standards Law.
C. Subject to the foregoing provisions, the following definitions shall apply in
this Ordinance:
WS&S-0XS:pi:#189145:08/06/04
Best Management Schedules of activities, prohibitions of practices,
Practices maintenance procedures and other management
practices to prevent or reduce the introduction of FOG
to the sewer facilities.
Board The Board of Directors of the District.
Change in Operations Any change in the ownership, food types, or
operational procedures that have the potential to
increase the amount of FOG generated and/or
discharged by Food Service Establishments in an
amount that alone or collectively causes or creates a
potential for SSOs to occur.
Composite Sample A collection of individual samples obtained at selected
intervals based on an increment of either flow or time.
The resulting mixture (composite sample) forms a
representative sample of the wastestream discharged
during the sample period. Samples will be collected
when a wastewater discharge occurs.
Discharger Any person who discharges or causes a discharge of
wastewater directly or indirectly to a public sewer.
Discharger shall mean the same as User.
District The Orange County Sanitation District.
Sewer Facility or Any property belonging to the District used in the
System treatment, reclamation, reuse, transportation, or
disposal of wastewater, or sludge.
Effluent Any liquid outflow from the Food Service Establishment
that is discharged to the sewer.
Fats, Oils, and Any substance such as a vegetable or animal product
Grease ("FOG") that is used in, or is a by product of, the cooking or
food preparation process, and that turns or may turn
viscous or solidifies with a change in temperature or
other conditions.
FOG Control Program The FOG Control Program required by and developed
pursuant to RWQCB Order No. R8-2002-0014, Section
(c)(12)(viii).
WS&S-OXS:pj:#189145:08/06/(A 4
FOG Control Program The individual designated by the District to administer
Manager the FOG Control Program. The FOG Control Program
Manager is responsible for all determinations of
compliance with the program, including approval of
discretionary variances and waivers.
FOG Wastewater A permit issued by the District subject to the
Discharge Permit requirements and conditions established by the District
authorizing the permittee or discharger to discharge
wastewater into the District's facilities or into sewer
facilities which ultimately discharge into a District
facility.
Food Service Facilities defined in California Uniform Retail Food
Establishment Service Establishments Law (CURFFL) Section
113785, and any commercial entity within the
boundaries of the District, operating in a permanently
constructed structure such as a room, building, or
place, or portion thereof, maintained, used, or operated
for the purpose of storing, preparing, serving, or
manufacturing, packaging, or otherwise handling food
for sale to other entities, or for consumption by the
public, its members or employees, and which has any
process or device that uses or produces FOG, or
grease vapors, steam, fumes, smoke or odors that are
required to be removed by a Type I or Type II hood, as
defined in CURFFL Section 113785. A limited food
preparation establishment is not considered a Food
Service Establishment when engaged only in
reheating, hot holding or assembly of ready to eat food
products and as a result, there is no wastewater
discharge containing a significant amount of FOG. A
limited food preparation establishment does not include
any operation that changes the form, flavor, or
consistency of food.
Food Grinder Any device installed in the plumbing or sewage system
for the purpose of grinding food waste or food
preparation by products for the purpose of disposing it
in the sewer system.
Grease Control Any grease interceptor, grease trap or other
Device mechanism, device, or process, which attaches to, or
is applied to, wastewater plumbing fixtures and lines,
the purpose of which is to trap or collect or treat FOG
prior to it being discharged into the sewer system.
"Grease control device" may also include any other
proven method to reduce FOG subject to the approval
of the District.
WS&S-OXS:pi:#1891 15:08/06/N 5
Grease Disposal A fee charged to an Owner/Operator of a Food Service
Mitigation Fee Establishment when there are physical limitations to
the property that make the installation of the usual and
customary grease interceptor or grease control device
for the Food Service Establishment under
consideration, impossible or impracticable. The
Grease Disposal Mitigation Fee is intended to cover
the costs of increased maintenance of the sewer
system for inspection and cleaning of FOG and other
viscous or solidifying agents that a properly employed
grease control device would otherwise prevent from
entering the sewer system.
Grease Interceptor A multi-compartment device that is constructed in
different sizes and is generally required to be located,
according to the California Plumbing Code,
underground between a Food Service Establishment
and the connection to the sewer system. These
devices primarily use gravity to separate FOG from the
wastewater as it moves from one compartment to the
next. These devices must be cleaned, maintained, and
have the FOG removed and disposed of in a proper
manner on regular intervals to be effective.
Grease Trap A grease control device that is used to serve individual
fixtures and have limited effect and should only be
used in those cases where the use of a grease
interceptor or other grease control device is
determined to be impossible or impracticable.
General Manager The individual duly designated by the Board of
Directors of the District to administer this Ordinance.
Grab Sample A sample taken from a waste stream on a one-time
basis without regard to the flow in the waste stream
and without consideration of time.
Hot Spots Areas in sewer lines that have experienced sanitary
sewer overflows or that must be cleaned or maintained
frequently to avoid blockages of sewer system.
Inflow Water entering a sewer system through a direct
stormwater/ runoff connection to the sanitary sewer,
which may cause an almost immediate increase in
wastewater flows.
Infiltration Water entering a sewer system, including sewer
service connections, from the ground through such
means as defective pipes, pipe joints, connections, or
manhole walls.
ws&s—0xs:Fi:#189145:08/06/c4 6
Inspector A person authorized by the District to inspect any
existing or proposed wastewater generation,
conveyance, processing, and disposal facilities.
Interceptor A grease interceptor.
Interference Any discharge which, alone or in conjunction with
discharges from other sources, inhibits or disrupts the
District's sewer system, treatment processes or
operations; or is a cause of violation of the District's
NPDES or Waste Discharge Requirements or prevents
lawful sludge use or disposal.
Local Sewering Any public agency or private entity responsible for the
Agency collection and disposal of wastewater to the District's
sewer facilities duly authorized under the laws of the
State of California to construct and/or maintain public
sewers.
NPDES The National Pollutant Discharge Elimination System;
the permit issued to control the discharge of liquids or
other substances or solids to surface waters of the
United States as detailed in Public Law 92-500,
Section 402.
New Construction Any structure planned or under construction for which
a sewer connection permit has not been issued.
Permittee A person who has received a permit to discharge
wastewater into the District's sewer facilities subject to
the requirements and conditions established by the
District.
Person Any individual, partnership, firm, association,
corporation or public agency, including the State of
California and the United States of America_
Public Agency The State of California and/or any city, county, special
district, other local governmental authority or public
body of or within this State.
Public Sewer A sewer owned and operated by the District, or other
local Public Agency, which is tributary to the District's
sewer facilities.
WS&S-OX5:pj:#189145:08/0h/04 7
Regulatory Agencies Regulatory Agencies shall mean those agencies
having regulatory jurisdiction over the operations of the
District, including, but not limited to:
a) United States Environmental Protection
Agency, Region IX, San Francisco and
Washington, DC (EPA).
b) California State Water Resources Control
Board (SWRCB).
c) California Regional Water Quality Control
Board, Santa Ana Region (RWQCB).
d) South Coast Air Quality Management District
(SCAQMD).
e) California Department of Health Services
(DOHS).
Remodeling A physical change or operational change causing
generation of the amount of FOG that exceed the
current amount of FOG discharge to the sewer system
by the Food Service Establishment in an amount that
alone or collectively causes or create a potential for
SSOs to occur; or exceeding a cost of $50,000 to a
Food Service Establishment that requires a building
permit, and involves any one or combination of the
following: (1) Under slab plumbing in the food
processing area, (2) a 30% increase in the net public
seating area, (3) a 30% increase in the size of the
kitchen area, or (4) any change in the size or type of
food preparation equipment.
Sample Point A location approved by the District, from which
wastewater can be collected that is representative in
content and consistency of the entire flow of
wastewater being sampled.
Sampling Facilities Structure(s) provided at the user's expense for the
District or user to measure and record wastewater
constituent mass, concentrations, collect a
representative sample, or provide access to plug or
terminate the discharge.
Sewage Wastewater.
Sewer Facilities or Any and all facilities used for collecting, conveying,
System pumping, treating, and disposing of wastewater and
sludge_
WS&S-OXS:pi:#1891.15:08/06/04 8
Sewer Lateral A building sewer as defined in the latest edition of the
California Plumbing Code. It is the wastewater
connection between the building's wastewater facilities
and a public sewer system.
Sludge Any solid, semi-solid or liquid decant, subnate or
supernate from a manufacturing process, utility
service, or pretreatment facility.
Twenty-five percent Requirement for grease interceptors to be maintained
(25%) Rule such that the combined FOG and solids accumulation
does not exceed 25% of the design hydraulic depth of
the grease interceptor. This is to ensure that the
minimum hydraulic retention time and required
available hydraulic volume is maintained to effectively
intercept and retain FOG discharged to the sewer
system.
User Any person who discharges or causes a discharge of
wastewater directly or indirectly to a public sewer
system. User shall mean the same as Discharger.
Waste Sewage and any and all other waste substances,
liquid, solid, gaseous or radioactive, associated with
human habitation or of human or animal nature,
including such wastes placed within containers of
whatever nature prior to and for the purpose of
disposal.
Manifest That receipt which is retained by the generator of
wastes for disposing recyclable wastes or liquid wastes
as required by the District.
Waste Minimization Plans or programs intended to reduce or eliminate
Practices discharges to the sewer system or to conserve water,
including, but not limited to, product substitutions,
housekeeping practices, inventory control, employee
education, and other steps as necessary to minimize
wastewater produced.
Wastehauler Any person carrying on or engaging in vehicular
transport of waste as part of, or incidental to, any
business for that purpose.
Wastewater The liquid and water-carried wastes of the community
and all constituents thereof, whether treated or
untreated, discharged into or permitted to enter a
public sewer.
WS&S-OXS:pj:#189145:08/06/04 9
Wastewater The individual chemical, physical, bacteriological, and
Constituents and other parameters, including volume and flow rate and
Characteristics such other parameters that serve to define, classify or
measure the quality and quantity of wastewater.
D. Words used in this Ordinance in the singular may include the plural and
the plural the singular. Use of masculine shall mean feminine and use of
feminine shall mean masculine. Shall is mandatory; may is permissive or
discretionary.
WS&S-0XS:pj:#189145:08/06/(A 10
0
ARTICLE 2 -GENERAL LIMITATIONS, PROHIBITIONS, AND REQUIREMENTS ON
FATS, OILS, AND GREASE ("FOG") DISCHARGES
2.1 FOG DISCHARGE REQUIREMENT
No Food Service establishment shall discharge or cause to be discharged into
the sewer system FOG that exceeds a concentration level adopted by the Board
or that may accumulate and/or cause or contribute to blockages in the sewer
system or at the sewer system lateral which connects the Food Service
Establishment to the sewer system.
2.2 PROHIBITIONS
The following prohibitions shall apply to all Food Service Establishments:
A. Installation of food grinders in the plumbing system of new constructions
of Food Service Establishments shall be prohibited. Furthermore, all food
grinders shall be removed from all existing Food Service Establishments
within 180 days of the effective date of this Ordinance, except when
expressly allowed by the FOG Control Program Manager.
B. Introduction of any additives into a Food Service Establishment's
wastewater system for the purpose of emulsifying FOG or
biologically/chemically treating FOG for grease remediation or as a
supplement to interceptor maintenance, unless a specific written
authorization from the FOG Control Program Manager is obtained.
C. Disposal of waste cooking oil into drainage pipes is prohibited. All waste
cooking oils shall be collected and stored properly in receptacles such as
barrels or drums for recycling or other acceptable methods of disposal.
D. Discharge of wastewater from dishwashers to any grease trap or grease
interceptor is prohibited.
E. Discharge of wastewater with temperatures in excess of 140°F to any
grease control device, including grease traps and grease interceptors, is
prohibited.
F. Discharge of wastes from toilets, urinals, wash basins, and other fixtures
containing fecal materials to sewer lines intended for grease interceptor
service, or vice versa, is prohibited.
G. Discharge of any waste including FOG and solid materials removed from
the grease control device to the sewer system is prohibited. Grease
removed from grease interceptors shall be wastehauled periodically as
part of the operation and maintenance requirements for grease
interceptors.
WS&S-OXS:pj:#189145:08/05/04 11
D
H. Operation of grease interceptors with FOG and solids accumulation
exceeding 25% of the design hydraulic depth of the grease interceptor
(25% Rule)
2.3 FOG WASTEWATER DISCHARGE PERMIT REQUIRED
No person shall discharge, or cause to be discharged any wastewater from Food
Service Establishments directly or indirectly into the sewer system without first
obtaining a FOG Wastewater Discharge Permit pursuant to this Ordinance.
2.4 BEST MANAGEMENT PRACTICES REQUIRED
All Food Services Establishments shall implement Best Management Practices in
its operation to minimize the discharge of FOG to the sewer system. Detailed
requirements for Best Management Practices shall be specified in the permit.
This may include kitchen practices and employee training that are essential in
minimizing FOG discharge.
2.5 FOG PRETREATMENT REQUIRED
Food Service Establishments are required to install, operate and maintain an
approved type and adequately sized grease interceptor necessary to maintain
compliance with the objectives of this Ordinance, subject to the variance and
waiver provisions of Section 2.6. The grease interceptor shall be adequate to
separate and remove FOG contained in wastewater discharges from Food
Service Establishments prior to discharge to the sewer system. Fixtures,
equipment, and drain lines located in the food preparation and clean up areas of
Food Service Establishments that are sources of FOG discharges shall be
connected to the grease interceptor. Compliance shall be established as follows:
A. New Construction of Food Service Establishments
New construction of Food Service Establishments shall include and install
grease interceptors prior to commencing discharges of wastewater to the
sewer system.
B. Existing Food Service Establishments
1. For existing Food Service Establishments, the requirement to
install and to properly operate and maintain a grease interceptor
may be conditionally stayed, that is, delayed in its implementation
by the FOG Control Program Manager for a maximum period of
three years from the effective date of this Ordinance (3-year
Amortization Period). Terms and conditions for application of a
stay to a Food Service Establishment shall be set forth in the
permit. The Board finds that three years is a reasonable
amortization period for existing Food Service Establishments that
are operating without a grease interceptor.
WS&S-OXS:p1:#189145:08/06/(M 12
2. Existing Food Service Establishments, which have caused or
contributed to grease-related blockage in the sewer system, or
which have sewer laterals connected to hot spots, or which have
been determined to contribute significant FOG to the sewer
system by the FOG Control Program Manager based on
inspection or sampling, shall be deemed to have reasonable
potential to adversely impact the sewer system, and shall install
grease interceptors within 180 days upon notification by the
District.
3. Existing Food Service Establishments or Food Service
Establishments that change ownership, that undergo remodeling
or a change in operations as defined in Section 1.2 of this
Ordinance, shall be required to install a grease interceptor.
2.6 VARIANCE AND WAIVER OF GREASE INTERCEPTOR REQUIREMENT
A. Variance from Grease Interceptor Requirements
An existing Food Service Establishment may obtain a variance from the
grease interceptor requirement to allow alternative pretreatment
technology that is, at least, equally effective in controlling the FOG
discharge in lieu of a grease interceptor, if the Food Service
Establishment demonstrates that it is impossible or impracticable to
install, operate or maintain a grease interceptor. The FOG Control
Program Manager's determination to grant a variance will be based upon,
but not limited to, evaluation of the following conditions:
1. There is no adequate space for installation and/or maintenance of
a grease interceptor.
2. There is no adequate slope for gravity flow between kitchen
plumbing fixtures and the grease interceptor and/or between the
grease interceptor and the private collection lines or the public
sewer.
3. The Food Service Establishment can justify that the alternative
pretreatment technology is equivalent or better than a grease
interceptor in controlling its FOG discharge. In addition, the Food
Service Establishment must be able to demonstrate, after
installation of the proposed alternative pretreatment, its
effectiveness to control FOG discharge through downstream
visual monitoring of the sewer system, for at least three months,
at its own expense. A Variance may be granted if the results show
no visible accumulation of FOG in its lateral and/or tributary
downstream sewer lines.
B. Conditional Waiver from Installation of Grease Interceptor
An existing Food Service Establishment may obtain a conditional waiver
from installation of a grease interceptor, if the Food Service
WS&S-0XS:pj:#189145:()8/06/(9 13
Establishment demonstrates that it has negligible FOG discharge and
insignificant impact to the sewer system. Although a waiver from
installation of grease interceptor may be granted, the Food Service
Establishment may be required to provide space and plumbing
segregation for future installation of grease interceptor. The FOG Control
Program Manager's determination to grant or revoke a conditional waiver
shall be based upon, but not limited to, evaluation of the following
conditions:
1. Quantity of FOG discharge as measured or as indicated by the
size of Food Service Establishment based on seating capacity,
number of meals served, menu, water usage, amount of on-site
consumption of prepared food and other conditions that may
reasonably be shown to contribute to FOG discharges.
2. Adequacy of implementation of Best Management Practices and
compliance history.
3. Sewer size, grade, condition based on visual information, FOG
deposition in the sewer by the Food Service Establishment, and
history of maintenance and sewage spills in the receiving sewer
system.
4. Changes in operations that significantly affect FOG discharge.
5. Any other condition deemed reasonably related to the generation
of FOG discharges by the FOG Control Program Manager.
C. Waiver from Grease Interceptor Installation with a Grease Disposal
Mitigation Fee
For Food Service Establishments where the installation of grease
interceptor is not feasible and no equivalent alternative pretreatment can
be installed, a waiver from the grease interceptor requirement may be
granted with the imposition of a Grease Disposal Mitigation Fee as
described in Section 2.8. Additional requirements may be imposed to
mitigate the discharge of FOG into the sewer system. The FOG Control
Program Manager's determination to grant the waiver with a Grease
Disposal Mitigation Fee will be based upon, but not limited to, evaluation
of the following conditions:
1. There is no adequate space for installation and/or maintenance of
a grease interceptor.
2. There is no adequate slope for gravity flow between kitchen
plumbing fixtures and the grease interceptor and/or between the
grease interceptor and the private collection lines or the public
sewer.
3. A variance from grease interceptor installation to allow alternative
pretreatment technology cannot be granted.
ws&s-0x5:pi:#1891 45:os/c6/«+ 14
D. Application for Waiver or Variance of Requirement for Grease Interceptor
A Food Service Establishment may submit an application for waiver or
variance from the grease interceptor requirement to the FOG Control
Program Manager. The Food Service Establishment bears the burden of
demonstrating, to the FOG Control Program Manager's reasonable
satisfaction, that the installation of a grease interceptor is not feasible or
applicable. Upon determination by the FOG Control Program Manager
that reasons are sufficient to justify a variance or waiver, the permit will be
issued or revised to include the variance or waiver and relieve the Food
Service Establishment from the requirement.
E. Terms and conditions
A variance or waiver shall contain terms and conditions that serve as
basis for its issuance. A waiver or variance may be revoked at any time
when any of the terms and conditions for its issuance is not satisfied or if
the conditions upon which the waiver was based change so that the
justification for the waiver no longer exists. The waiver or variance shall
be valid so long as the Food Service Establishment remains in
compliance with their terms and conditions until the expiration date
specified in the variance or waiver.
2.7 COMMERCIAL PROPERTIES
Property owners of commercial properties or their official designee(s) shall be
responsible for the installation and maintenance of the grease interceptor serving
multiple Food Service Establishments that are located on a single parcel.
2.8 GREASE DISPOSAL MITIGATION FEE
Food Service Establishments that operate without a grease control interceptor
may be required to pay an annual Grease Disposal Mitigation Fee to equitably
cover the costs of increased maintenance of the sewer system as a result of the
Food Service Establishments' inability to adequately remove FOG from its
wastewater discharge. This Section shall not be interpreted to allow the new
construction of, or existing Food Service Establishments undergoing remodeling
or change in operations to operate without an approved grease interceptor
unless the District has determined that it is impossible or impracticable to install
or operate a grease control interceptor for the subject facility under the provisions
of Section 2.6 of this Ordinance.
A. The Grease Disposal Mitigation Fee shall be established by ordinance or
resolution of the Board of Directors, and shall be based on the estimated
annual increased cost of maintaining the sewer system for inspection and
removal of FOG and other viscous or solidifying agents attributable to the
Food Service Establishment resulting from the lack of a grease
interceptor or grease control device.
WS&S-0XS:pi:#189145:08/06/04 15
B. The Grease Disposal Mitigation Fee may be waived or reduced on a no
less than an annual basis when the discharger demonstrates to the
reasonable satisfaction of the FOG Control Program Manager that they
had used best management and waste minimization practices on a
regular basis that has significantly reduced the introduction of FOG into
the sewer system.
C. The Grease Disposal Mitigation Fee may not be waived or reduced when
the Food Service Establishment does not comply with the minimum
requirements of this Ordinance and/or its discharge into the sewer system
in the preceding 12 months has caused or potentially caused or
contributed alone or collectively, in sewer blockage or SSO in the sewer
downstream, or surrounding the Food Service Establishment prior to the
waiver request.
2.9 SEWER SYSTEM OVERFLOWS, PUBLIC NUISANCE, ABATEMENT ORDERS
AND CLEANUP COSTS
Notwithstanding the three-year amortization period established in Section 2.5,
Food Service Establishments found to have contributed to a sewer blockage,
SSOs or any sewer system interferences resulting from the discharge of
wastewater or waste containing FOG, shall be ordered to install and maintain a
grease interceptor, and may be subject to a plan to abate the nuisance and
prevent any future health hazards created by sewer line failures and blockages,
SSOs or any other sewer system interferences. SSOs may cause threat and
injury to public health, safety, and welfare of life and property and are hereby
declared public nuisances. Furthermore, sewer lateral failures and SSOs caused
by Food Service Establishments alone or collectively, are the responsibility of the
private property owner or Food Service Establishment, and individual(s) as a
responsible officer or owner of the Food Service Establishment. If the District
must act immediately to contain and clean up an SSO caused by blockage of a
private or public sewer lateral or system serving a Food Service Establishment ,
or at the request of the property owner or operator of the Food Service
Establishment, or because of the failure of the property owner or Food Service
Establishment to abate the condition causing immediate threat of injury to the
health, safety, welfare, or property of the public, the District's costs for such
abatement may be entirely borne by the property owner or operator of the Food
Service Establishment, and individual(s) as a responsible officer or owner of the
Food Service Establishment(s) and may constitute a debt to the District and
become due and payable upon the District's request for reimbursement of such
costs.
WS&S-0X5:pi:#189145:08/06/04 16
ARTICLE 3 - FOG WASTEWATER DISCHARGE PERMITS FOR FOOD SERVICE
ESTABLISHMENTS
3.1 FOG WASTEWATER DISCHARGE PERMIT REQUIRED
A Food Service Establishments proposing to discharge or currently
discharging wastewater containing FOG into the District's sewer system
shall obtain a FOG Wastewater Discharge Permit from the District. B.
FOG Wastewater Discharge Permits shall be expressly subject to
all provisions of this Ordinance and all other regulations, charges for use,
and fees established by the District. The conditions of FOG Wastewater
Discharge Permits shall be enforced by the District in accordance with
this Ordinance and applicable State and Federal Regulations.
3.2 FOG WASTEWATER DISCHARGE PERMIT APPLICATION
A. Any person required to obtain a FOG Wastewater Discharge Permit shall
complete and file with the District prior to commencing or continuing
discharges, an application in a form prescribed by the District. The
applicable fees shall accompany this application. The applicant shall
submit, in units and terms appropriate for evaluation, the following
information at a minimum:
1. Name, address, telephone number, assessor's parcel number(s),
description of the Food Service Establishment, operation, cuisine,
service activities, or clients using the applicant's services.
2. (Whichever is applicable) Name, address of any and all
principals/owners/major shareholders of the Food Service
Establishment; Articles of Incorporation; most recent Report of the
Secretary of State; Business License.
3. Name and address of property owner or lessor and the property
manager where the Food Service Establishment is located.
4. Any other information as specified in the application form.
B. Applicants may be required to submit site plans, floor plans, mechanical
and plumbing plans, and details to show all sewers, FOG control device,
grease interceptor or other pretreatment equipment and appurtenances
by size, location, and elevation for evaluation.
C. Other information related to the applicant's business operations and
potential discharge may be requested to properly evaluate the permit
application.
D. After evaluation of the data furnished, the District may issue a FOG
Wastewater Discharge Permit, subject to terms and conditions set forth in
WS&S-OXS:pj:#189145:08/06/(M 17
this Ordinance and as otherwise determined by the FOG Control Program
Manager to be appropriate to protect the District's sewer system.
3.3 FOG WASTEWATER DISCHARGE PERMIT CONDITIONS
The issuance of a FOG Wastewater Discharge Permit may contain any of the
following conditions or limits:
A. Limits on discharge of FOG and other priority pollutants.
B. Requirements for proper operation and maintenance of grease
interceptors and other grease control devices.
C. Grease interceptor maintenance frequency and schedule.
D. Requirements for implementation of Best Management Practices and
installation of adequate grease interceptor and/or grease control device.
E. Requirements for maintaining and reporting status of Best Management
Practices
F. Requirements for maintaining and submitting logs and records, including
wastehauling records and waste manifests.
G. Requirements to self-monitor.
H. Requirements for the Food Service Establishment to construct, operate
and maintain, at its own expense, FOG control device and sampling
facilities.
I. Additional requirements as otherwise determined to be reasonably
appropriate by the FOG Control Program Manager to protect the District's
system or as specified by other Regulatory Agencies.
J. Other terms and conditions, which may be reasonably applicable to
ensure compliance with this Ordinance.
3.4 FOG WASTEWATER DISCHARGE PERMIT APPLICATION FEE
The FOG Wastewater Discharge Permit Application fee shall be paid by the
applicant in an amount adopted by ordinance or resolution of the Board of
Directors of the District. Payment of permit application fee must be received by
the District upon submission of the permit application. A permittee shall also pay
any delinquent invoices in full prior to permit renewal.
3.5 FOG WASTEWATER DISCHARGE PERMIT MODIFICATION OF TERMS AND
CONDITIONS
A. The terms and conditions of an issued permit may be subject to
modification and change by the sole determination of the FOG Control
Program Manager during the life of the permit based on:
ws&s-oxs:pi:#189145:08/06/0+ 18
1. The discharger's current or anticipated operating data;
2. The District's current or anticipated operating data;
3. Changes in the requirements of Regulatory Agencies which affect
the District; or
4. A determination by the FOG Control Program Manager that such
modification is appropriate to further the objectives of this
Ordinance.
B. The Permittee may request a modification to the terms and conditions of
an issued permit. The request shall be in writing stating the requested
change, and the reasons for the change. The FOG Control Program
Manager shall review the request, make a determination on the request,
and respond in writing.
C. The Permittee shall be informed of any change in the permit limits,
conditions, or requirements at least forty-five (45) days prior to the
effective date of change. Any changes or new conditions in the permit
shall include a reasonable time schedule for compliance.
3.6 FOG WASTEWATER DISCHARGE PERMIT DURATION AND RENEWAL
FOG Wastewater Discharge Permits shall be issued for a period not to exceed
four (4) years. At least 60 days prior to the expiration of the permit, the user shall
apply for renewal of the permit in accordance with the provisions of this Article 3.
3.7 EXEMPTION FROM FOG WASTEWATER DISCHARGE PERMIT
A limited food preparation establishment is not considered a Food Service
Establishment and is exempt from obtaining a FOG Wastewater Discharge
Permit. Exempted establishments shall be engaged only in reheating, hot holding
or assembly of ready to eat food products and as a result, there is no wastewater
discharge containing significant amount of FOG. A limited food preparation
establishment does not include any operation that changes the form, flavor, or
consistency of food.
3.8 NON-TRANSFERABILITY OF PERMITS
FOG Wastewater Discharge Permits issued under this Ordinance are for a
specific Food Service Establishment, for a specific operation and create no
vested rights.
A. No permit holder shall assign, transfer, sell any FOG Wastewater
Discharge Permit issued under this Ordinance nor use any such permit
for or on any premises or for facilities or operations or discharges not
expressly encompassed within the underlying permit.
B. Any permit which is transferred to a new owner or operator or to a new
facility is void.
ws&s-oxs:pi:#189145:08/06/(M 19
3.9 FOG WASTEWATER DISCHARGE PERMIT CHARGE FOR USE
A charge to cover all costs of the District for providing the sewer service and
monitoring shall be established by Ordinance or Resolution of the Board of
Directors of the District.
WS&S-OXS:pj:#189145:08/06/04 20
ARTICLE 4 - FACILITIES REQUIREMENTS
4.1 DRAWING SUBMITTAL REQUIREMENTS
Upon request by the District:
A. Food Service Establishments may be required to submit two copies of
facility site plans, mechanical and plumbing plans, and details to show all
sewer locations and connections. The submittal shall be in a form and
content acceptable to the District for review of existing or proposed
grease control device, grease interceptor, monitoring facilities, metering
facilities, and operating procedures. The review of the plans and
procedures shall in no way relieve the Food Service Establishments of
the responsibility of modifying the facilities or procedures in the future, as
necessary to produce an acceptable discharge, and to meet the
requirements of this Ordinance or any requirements of other Regulatory
Agencies.
B. Applicants may be required to submit site plans, floor plans, mechanical
and plumbing plans, and details to show all sewers, FOG control device,
grease interceptor or other pretreatment equipment and appurtenances
by size, location, and elevation for evaluation.
C. Food Service Establishments may be required to submit a schematic
drawing of the FOG control device, grease interceptor or other
pretreatment equipment, piping and instrumentation diagram, and
wastewater characterization report.
D. The District may require the drawings be prepared by a California
Registered Civil, Chemical, Mechanical, or Electrical Engineer.
4.2 GREASE INTERCEPTOR REQUIREMENTS
A. All Food Service Establishments shall provide wastewater acceptable to
the District, under the requirements and standards established herein
before discharging to any public sewer. Any Food Service Establishment
required to provide FOG pretreatment shall install, operate, and maintain
an approved type and adequately sized grease interceptor necessary to
maintain compliance with the objectives of this Ordinance.
B. Grease interceptor sizing and installation shall conform to the current
edition of the Uniform Plumbing Code. Grease interceptors shall be
constructed in accordance with the design approved by the FOG Control
Program Manager and shall have a minimum of two compartments with
fittings designed for grease retention.
C. The grease interceptor shall be installed at a location where it shall be at
all times easily accessible for inspection, cleaning, and removal of
accumulated grease.
WS&S-OXS:pi:#189145:08/06/04 21
D. Access manholes, with a minimum diameter of 24 inches, shall be
provided over each grease interceptor chamber and sanitary tee. The
access manholes shall extend at least to finished grade and be designed
and maintained to prevent water inflow or infiltration. The manholes shall
also have readily removable covers to facilitate inspection, grease
removal, and wastewater sampling activities.
4.3 GREASE TRAP REQUIREMENTS
A. Food Service Establishments may be required to install grease traps in
the waste line leading from drains, sink, and other fixtures or equipment
where grease may be introduced into the sewer system in quantities that
can cause blockage.
B. Sizing and installation of grease traps shall conform to the current edition
of the California Plumbing Code.
C. Grease traps shall be maintained in efficient operating conditions by
removing accumulated grease on a daily basis.
D. Grease traps shall be maintained free of all food residues and any FOG
waste removed during the cleaning and scraping process.
E. Grease traps shall be inspected periodically to check for leaking seams
and pipes, and for effective operation of the baffles and flow regulating
device. Grease traps and their baffles shall be maintained free of all
caked-on FOG and waste. Removable baffles shall be removed and
cleaned during the maintenance process.
F. Dishwashers and food waste disposal units shall not be connected to or
discharged into any grease trap.
4.4 MONITORING FACILITIES REQUIREMENTS
A. The District may require the Food Service Establishments to construct
and maintain in proper operating condition at the Food Service
Establishment's sole expense, flow monitoring, constituent monitoring
and/or sampling facilities.
B. The location of the monitoring or metering facilities shall be subject to
approval by the FOG Control Program Manager.
C. Food Service Establishments may be required to provide immediate,
clear, safe and uninterrupted access to the FOG Control Program
Manager or inspectors to the Food Service Establishment's monitoring
and metering facilities.
D. Food Service Establishments may also be required by the FOG Control
Program Manager to submit waste analysis plans, contingency plans, and
meet other necessary requirements to ensure proper operation and
WS&S-0XS:pj:##189145:08/06/ll4 22
maintenance of the grease control device or grease interceptor and
compliance with this Ordinance.
E. No Food Service Establishment shall increase the use of water or in any
other manner attempt to dilute a discharge as a partial or complete
substitute for treatment to achieve compliance with this Ordinance and
the FOG Wastewater Discharge Permit.
4.5 REQUIREMENTS FOR BEST MANAGEMENT PRACTICES
A. All Food Service Establishments shall implement best management
practices in accordance with the requirements and guidelines established
by the District under its FOG Control Program in an effort to minimize the
discharge of FOG to the sewer system.
B. All Food Service Establishments shall be required, at a minimum, to
comply with the following Best Management Practices, when applicable:
1. Installation of drain screens. Drain screens shall be installed on
all drainage pipes in food preparation areas.
2. Segregation and collection of waste cookinq oil. All waste cooking
oil shall be collected and stored properly in recycling receptacles
such as barrels or drums. Such recycling receptacles shall be
maintained properly to ensure that they do not leak. Licensed
wastehaulers or an approved recycling facility must be used to
dispose of waste cooking oil.
3. Disposal of food waste. All food waste shall be disposed of
directly into the trash or garbage, and not in sinks. Double-
bagging food wastes that have the potential to leak in trash bins is
highly recommended.
4. Employee training. Employees of the food service establishment
shall be trained by ownership/management periodically as
specified in the permit, on the following subjects:
a) How to "dry wipe" pots, pans, dishware and work areas
before washing to remove grease.
b) How to properly dispose of food waste and solids in
enclosed plastic bags prior to disposal in trash bins or
containers to prevent leaking and odors.
c) The location and use of absorption products to clean under
fryer baskets and other locations where grease may be
spilled or dripped.
ws&s—0x5:pi:#7 H9745:08/u6/c4 23
d) How to properly dispose of grease or oils from cooking
equipment into a grease receptacle such as a barrel or
drum without spilling.
Training shall be documented and employee signatures retained
indicating each employee's attendance and understanding of the
practices reviewed. Training records shall be available for review
at any reasonable time by the FOG Control Program Manager or
an inspector.
5. Maintenance of kitchen exhaust filters. Filters shall be cleaned as
frequently as necessary to be maintained in good operating
condition. The wastewater generated from cleaning the exhaust
filter shall be disposed properly.
6. Kitchen signage. Best management and waste minimization
practices shall be posted conspicuously in the food preparation
and dishwashing areas at all times.
4.6 GREASE INTERCEPTOR MAINTENANCE REQUIREMENTS
A. Grease Interceptors shall be maintained in efficient operating condition by
periodic removal of the full content of the interceptor which includes
wastewater, accumulated FOG, floating materials, sludge and solids.
B. All existing and newly installed grease interceptors shall be maintained in
a manner consistent with a maintenance frequency approved by the FOG
Control Program Manager pursuant to this section.
C. No FOG that has accumulated in a grease interceptor shall be allowed to
pass into any sewer lateral, sewer system, storm drain, or public right of
way during maintenance activities.
D. Food Service Establishments with grease interceptors may be required to
submit data and information necessary to establish the maintenance
frequency grease interceptors.
E. The maintenance frequency for all Food Service Establishments with a
grease interceptor shall be determined in one of the following methods:
1. Grease interceptors shall be fully pumped out and cleaned at a
frequency such that the combined FOG and solids accumulation
does not exceed 25% of the total design hydraulic depth of the
grease interceptor. This is to ensure that the minimum hydraulic
retention time and required available hydraulic volume is
maintained to effectively intercept and retain FOG discharged to
the sewer system.
wS&S-OxS:pi:#189145:08/06/04 24
2. All Food Service Establishments with a Grease Interceptor shall
maintain their grease interceptor not less than every 6 months.
3. Grease interceptors shall be fully pumped out and cleaned
quarterly when the frequency described in (1) has not been
established. The maintenance frequency shall be adjusted when
sufficient data have been obtained to establish an average
frequency based on the requirements described in (1) and
guidelines adopted pursuant to the FOG Control Program. The
District may change the maintenance frequency at any time to
reflect changes in actual operating conditions in accordance with
the FOG Control Program. Based on the actual generation of FOG
from the Food Service Establishment, the maintenance frequency
may increase or decrease.
4. The owner/operator of a Food Service Establishment may submit
a request to the FOG Control Program Manager requesting a
change in the maintenance frequency at any time. The Food
Service Establishment has the burden of responsibility to
demonstrate that the requested change in frequency reflects
actual operating conditions based on the average FOG
accumulation over time and meets the requirements described in
(1), and that it is in full compliance with the conditions of its permit
and this Ordinance. Upon determination by the FOG Control
Program Manager that requested revision is justified, the permit
shall be revised accordingly to reflect the change in maintenance
frequency.
5. If the grease interceptor, at any time, contains FOG and solids
accumulation that does not meet the requirements described in
(1), the Food Service Establishment shall be required to have the
grease interceptor serviced immediately such that all fats, oils,
grease, sludge, and other materials are completely removed from
the grease interceptor. If deemed necessary, the FOG Control
Program Manager may also increase the maintenance frequency
of the grease interceptor from the current frequency.
F. Wastewater, accumulated FOG, floating materials, sludge/solids, and
other materials removed from the grease interceptor shall be disposed off
site properly by wastehaulers in accordance with federal, state and/or
local laws.
WS&S-0XS:pj:#189145:08/06/ll4 25
ARTICLE 5 - MONITORING, REPORTING, NOTIFICATION, AND INSPECTION
REQUIREMENTS
5.1 MONITORING AND REPORTING CONDITIONS
A. Monitoring for Compliance with Permit Conditions and Reporting
Requirements
1. The FOG Control Program Manager may require periodic
reporting of the status of implementation of Best Management
Practices, in accordance with the FOG Control Program.
2. The FOG Control Program Manager may require visual
monitoring at the sole expense of the Permittee to observe the
actual conditions of the Food Service Establishment's sewer
lateral and sewer lines downstream.
3. The FOG Control Program Manager may require reports for
self-monitoring of wastewater constituents and FOG
characteristics of the Permittee needed for determining
compliance with any conditions or requirements as specified in the
FOG Wastewater Discharge Permit or this Ordinance. Monitoring
reports of the analyses of wastewater constituents and FOG
characteristics shall be in a manner and form approved by the
FOG Control Program Manager and shall be submitted upon
request of the FOG Control Program Manager. Failure by the
Permittee to perform any required monitoring, or to submit
monitoring reports required by the FOG Control Program
Manager constitutes a violation of this Ordinance and be cause for
the District to initiate all necessary tasks and analyses to
determine the wastewater constituents and FOG characteristics
for compliance with any conditions and requirements specified in
the FOG Wastewater Discharge Permit or in this Ordinance. The
Permittee shall be responsible for any and all expenses of the
District in undertaking such monitoring analyses and preparation
of reports.
4. Other reports may be required such as compliance schedule
progress reports, FOG control monitoring reports, and any other
reports deemed reasonably appropriate by the FOG Control
Program Manager to ensure compliance with this Ordinance.
B. Record Keeping Requirements
The Permittee shall be required to keep all manifests, receipts and
invoices of all cleaning, maintenance, grease removal of/from the grease
control device, disposal carrier and disposal site location for no less than
two years. The Permittee shall, upon request, make the manifests,
WS&S-OXS:pj:#1R91(5:08/05/(4 26
receipts and invoices available to any District representative, or inspector.
These records may include:
1. A logbook of grease interceptor, grease trap or grease control
device cleaning and maintenance practices.
2. A record of Best Management Practices being implemented
including employee training.
3. Copies of records and manifests of wastehauling interceptor
contents.
4. Records of sampling data and sludge height monitoring for FOG
and solids accumulation in the grease interceptors.
5. Records of any spills and/or cleaning of the lateral or sewer
system.
6. Any other information deemed appropriate by the FOG Control
Program Manager to ensure compliance with this Ordinance.
C. Falsifying Information or Tampering with Process
It shall be unlawful to make any false statement, representation, record,
report, plan or other document that is filed with the District, or to tamper
with or knowingly render inoperable any grease control device, monitoring
device or method or access point required under this Ordinance.
5.2 INSPECTION AND SAMPLING CONDITIONS
A. The FOG Control Program Manager may inspect or order the inspection
and sample the wastewater discharges of any Food Service
Establishment to ascertain whether the intent of this Ordinance is being
met and the Permittee is complying with all requirements. The Permittee
shall allow the District access to the Food Service Establishment
premises, during normal business hours, for purposes of inspecting the
Food Service Establishment's grease control devices or interceptor,
reviewing the manifests, receipts and invoices relating to the cleaning,
maintenance and inspection of the grease control devices or interceptor.
B. The FOG Control Program Manager shall have the right to place or order
the placement on the Food Service Establishment's property or other
locations as determined by the FOG Control Program Manager, such
devices as are necessary to conduct sampling or metering operations.
Where a Food Service Establishment has security measures in force, the
Permittee shall make necessary arrangements so that representatives of
the District shall be permitted to enter without delay for the purpose of
performing their specific responsibilities.
WS&S-OXS:pj:#"189"145:08/06/04 27
C. In order for the FOG Control Program Manager to determine the
wastewater characteristics of the discharger for purposes of determining
the annual use charge and for compliance with permit requirements, the
Permittee shall make available for inspection and copying by the District
all notices, monitoring reports, waste manifests, and records including,
but not limited to, those related to wastewater generation, and
wastewater disposal without restriction but subject to the confidentiality
provision set forth in this Ordinance. All such records shall be kept by the
Permittee a minimum of two (2) years.
5.3 RIGHT OF ENTRY
Persons or occupants of premises where wastewater is created or discharged
shall allow the FOG Control Program Manager, or District representatives,
reasonable access to all parts of the wastewater generating and disposal
facilities for the purposes of inspection and sampling during all times the
discharger's facility is open, operating, or any other reasonable time. No person
shall interfere with, delay, resist or refuse entrance to District representatives
attempting to inspect any facility involved directly or indirectly with a discharge of
wastewater to the District's sewer system. In the event of an emergency involving
actual or imminent sanitary sewer overflow, District's representatives may access
adjoining businesses or properties which share a sewer system with a Food
Service Establishment in order to prevent or remediate an actual or imminent
sanitary overflow.
5.4 NOTIFICATION OF SPILL
A. In the event a permittee is unable to comply with any permit condition due
to a breakdown of equipment, accidents, or human error or the Permittee
has reasonable opportunity to know that his/her/its discharge will exceed
the discharge provisions of the FOG Wastewater Discharge Permit or this
Ordinance, the discharger shall immediately notify the District by
telephone at the number specified in the Permit. If the material
discharged to the sewer has the potential to cause or result in sewer
blockages or SSOs, the discharger shall immediately notify the local
Health Department, City or County, and the District.
B. Confirmation of this notification shall be made in writing to the FOG
Control Program Manager at the address specified in the Permit no later
than five (5) working days from the date of the incident. The written
notification shall state the date of the incident, the reasons for the
discharge or spill, what steps were taken to immediately correct the
problem, and what steps are being taken to prevent the problem from
recurring.
C. Such notification shall not relieve the Permittee of any expense, loss,
damage or other liability which may be incurred as a result of damage or
loss to the District or any other damage or loss to person or property; nor
shall such notification relieve the Permittee of any fees or other liability
which may be imposed by this Ordinance or other applicable law.
WS&S-0XS:pj:##189145:08/06/(9 28
5.5 NOTIFICATION OF PLANNED CHANGES
Permittee shall notify the District at least 60 days in advance prior to any facility
expansion/remodeling, or process modifications that may result in new or
substantially increased FOG discharges or a change in the nature of the
discharge. Permittee shall notify the District in writing of the proposed expansion
or remodeling and shall submit any information requested by the District for
evaluation of the effect of such expansion on Permittee's FOG discharge to the
sewer system.
WS&S-0XS:pj:#'189145:08/06/(9 29
ARTICLE 6 - ENFORCEMENT
6.1 PURPOSES AND SCOPE
A. The Board of Directors finds that in order for the District to comply with
the laws, regulations, and rules imposed upon it by Regulatory Agencies
and to ensure that the District's sewer facilities are protected and are able
to operate with the highest degree of efficiency, and to protect the public
health and environment, specific enforcement provisions must be adopted
to govern the discharges to the District's system by Food Service
Establishments.
B. To ensure that all interested parties are afforded due process of law and
that violations are resolved as soon as possible, the general policy of the
District is that:
1. Any determination relating to a notice of violation and Compliance
Schedule Agreement (CSA) will be made by the FOG Control
Program Manager, with a right of appeal by the permittee to the
General Manager pursuant to the procedures set forth in Section
6.12.
2. A permittee, or applicant for a permit may request the Board of
Directors of the District to hear an appeal of the General
Manager's decision pursuant to Section 6.13. Such request may
be granted or denied by the Board of Directors.
3. Any permit suspension or revocation recommended by the FOG
Control Program Manager will be heard and a recommendation
made to the General Manager or other person designated by the
General Manager with a right of appeal of the General Manager's
order by the permittee to the Board of Directors pursuant to the
provisions of Section 6.13.
C. The District, at its discretion, may utilize any one, combination, or all
enforcement remedies provided in Article 6 in response to any permit or
Ordinance violations.
6.2 DETERMINATION OF NONCOMPLIANCE WITH FOG WASTEWATER
DISCHARGE PERMIT CONDITIONS
A. Inspection Procedures
1. Inspection of Food Service Establishments shall be conducted in
the time, place, manner, and frequency determined at the sole
discretion of the FOG Control Program Manager.
2. Noncompliance with Best Management Practices, 25% Rule for
grease interceptors, maintenance frequency requirements for
WS&S-Oxs:pi:4189145:08/06/04 30
grease interceptors, permit discharge conditions, or any discharge
provisions of this Ordinance may be determined by an inspection
of the Food Service Establishment.
B. Sampling Procedures
1. Sampling of Food Service Establishments shall be conducted in
the time, place, manner, and frequency determined at the sole
discretion of the District.
2. Non-compliance with mass emission rate limits, concentration
limits, permit discharge conditions, or any discharge provision of
this Ordinance may be determined by an analysis of a grab or
composite sample of the effluent of a user. Non-compliance with
mass emission rate limits shall be determined by an analysis of a
composite sample of the user's effluent, except that a grab sample
may be used to determine compliance with mass emission rate
limits when the discharge is from a closed (batch) treatment
system in which there is no wastewater flow into the system when
the discharge is occurring, the volume of wastewater contained in
the batch system is known, the time interval of discharge is
known, and the grab sample is homogeneous and representative
of the discharge.
3. Any sample taken from a sample point is considered to be
representative of the discharge to the public sewer.
C. Noncompliance Fees
Any permittee determined to be in noncompliance with the terms and
conditions specified in its permit or with any provision of this Ordinance
shall pay a noncompliance fee. The purpose of the noncompliance fee is
to compensate the District for costs of additional inspection and follow-up,
sampling, monitoring, laboratory analysis, treatment, disposal, and
administrative processing incurred as a result of the noncompliance, and
shall be in addition to and not in lieu of any penalties as may be assessed
pursuant to Sections 6.10 and 6.11. Noncompliance fees shall be in the
amount adopted by ordinance or resolution by the District's Board of
Directors.
6.3 COMPLIANCE SCHEDULE AGREEMENT (CSA)
A. Upon determination that a permittee is in noncompliance with the terms
and conditions specified in its permit or any provision of this Ordinance, or
needs to construct and/or acquire and install a grease control device or
grease interceptor, the FOG Control Program Manager may require the
permittee to enter into a CSA.
B. The issuance of a CSA may contain terms and conditions including but
not limited to requirements for installation of a grease control device,
WS&S-0XS:pj:#189145:08/05/04 31
grease interceptor and facilities, submittal of drawings or reports, audit of
waste hauling records, best management and waste minimization
practices, payment of fees, or other provisions to ensure compliance with
this Ordinance.
C. The FOG Control Program Manager shall not enter into a CSA until such
time as all amounts owed to the District, including user fees,
noncompliance sampling fees, or other amounts due are paid in full, or
an agreement for deferred payment secured by collateral or a third party,
is approved by the FOG Control Program Manager.
D. If compliance is not achieved in accordance with the terms and conditions
of a CSA during its term, the FOG Control Program Manager may issue
an order suspending or revoking the discharge permit pursuant to Section
6.4 or 6.5 of this Ordinance.
6.4 PERMIT SUSPENSION
A. The General Manager may suspend any permit when it is determined that
a permittee:
1. Fails to comply with the terms and conditions of a CSA order.
2. Knowingly provides a false statement, representation, record,
report, or other document to the District.
3. Refuses to provide records, reports, plans, or other documents
required by the District to determine permit terms or conditions,
discharge compliance, or compliance with this Ordinance.
4. Falsifies, tampers with, or knowingly renders inaccurate any
monitoring device or sample collection method.
5. Refuses reasonable access to the permittee's premises for the
purpose of inspection and monitoring.
6. Does not make timely payment of all amounts owed to the District
for user charges, permit fees, or any other fees imposed pursuant
to this Ordinance.
7. Causes interference, sewer blockages, or SSOs with the District's
collection, treatment, or disposal system.
8. Violates grease interceptor maintenance requirements, any
condition or limit of its discharge permit or any provision of the
District's Ordinance.
B. When the FOG Control Program Manager has reason to believe that
grounds exist for permit suspension, he/she shall give written notice
thereof by certified mail to the permittee setting forth a statement of the
facts and grounds deemed to exist, together with the time and place
ws&s-0xs:Fi:#189145:08/06/(9 32
where the charges shall be heard by the General Manager or his/her
designee. The hearing date shall be not less than fifteen (15) calendar
days nor more than forty-five (45) calendar days after the mailing of such
notice.
1. At the suspension hearing, the permittee shall have an opportunity
to respond to the allegations set forth in the notice by presenting
written or oral evidence. The hearing shall be conducted in
accordance with procedures established by the General Manager
and approved by the District's General Counsel.
2. If the General Manager designated a hearing officer, after the
conclusion of the hearing, the hearing officer shall submit a written
report to the General Manager setting forth a brief statement of
facts found to be true, a determination of the issues presented,
conclusions, and a recommendation.
3. Upon receipt of the written report of a hearing officer or conclusion
of the hearing, if the General Manager conducted the hearing, the
General Manager shall make his/her determination and should
he/she find that grounds exist for suspension of the permit, he/she
shall issue his/her decision and order in writing within thirty (30)
calendar days after the conclusion of the hearing. The written
decision and order of the General Manager shall be sent by
certified mail to the permittee or its legal counsel/representative at
the permittee's business address.
C. Effect
1. Upon an order of suspension by the General Manager becoming
final, the permittee shall immediately cease and desist its
discharge and shall have no right to discharge any wastewater
containing FOG directly or indirectly to the District's system for the
duration of the suspension. All costs for physically terminating
and reinstating service shall be paid by the permittee.
2. Any owner or responsible management employee of the permittee
shall be bound by the order of suspension.
3. An order of permit suspension issued by the General Manager
shall be final in all respects on the sixteenth (16th) day after it is
mailed to the permittee unless a request for hearing is filed with
the Board of Directors of the District pursuant to Section 6.13. no
later than 5:00 p.m. on the fifteenth (15th) day following such
mailing.
6.5 PERMIT REVOCATION
A. The General Manager may revoke any permit when it is determined that a
permittee:
WS&S-OXS:pj:#189145:08/06/04 33
1. Knowingly provides a false statement, representation, record,
report, or other document to the District.
2. Refuses to provide records, reports, plans, or other documents
required by the District to determine permit terms, conditions,
discharge compliance, or compliance with this Ordinance.
3. Falsifies, tampers with, or knowingly renders inaccurate any
monitoring device or sample collection method.
4. Fails to comply with the terms and conditions of permit suspension
or CSA.
5. Discharges effluent to the District's sewer system while its permit
is suspended.
6. Refuses reasonable access to the permittee's premises for the
purpose of inspection and monitoring.
7. Does not make timely payment of all amounts owed to the District
for user charges, permit fees, or any other fees imposed pursuant
to this Ordinance.
8. Causes interference, sewer blockages, or SSOs with the District
collection, treatment, or disposal system.
9. Violates grease interceptor maintenance requirements, any
condition or limit of its discharge permit or any provision of the
District's Ordinance.
B. Approval. When the FOG Control Program Manager has reason to
believe that grounds exist for the revocation of a permit, he/she shall give
written notice by certified mail thereof to the permittee setting forth a
statement of the facts and grounds deemed to exist together with the time
and place where the charges shall be heard by the General Manager or
his/her designee. The hearing date shall be not less than fifteen (15)
calendar days nor more than forty-five (45) calendar days after the
mailing of such notice.
1. At the hearing, the permittee shall have an opportunity to respond
to the allegations set forth in the notice by presenting written or
oral evidence. The revocation hearing shall be conducted in
accordance with the procedures established by the General
Manager and approved by the District's General Counsel.
2. If the General Manager designated a hearing officer, after the
conclusion of the hearing, the hearing officer shall submit a written
report to the General Manager setting forth a brief statement of
facts found to be true, a determination of the issues presented,
conclusions, and a recommendation.
WS&S-OXS:pj:#189145:08/06/04 34
3. Upon receipt of the written report by the hearing officer, or
conclusion of the hearing, if the General Manager conducted the
hearing, the General Manager shall make his/her determination
and should he/she find that grounds exist for permanent
revocation of the permit, he/she shall issue his/her decision and
order in writing within thirty (30) calendar days after the conclusion
of the hearing. The written decision and order of the General
Manager shall be sent by certified mail to the permittee or its legal
counsel/representative at the permittee's business address.
In the event the General Manager determines to not revoke the
permit, he/she may order other enforcement actions, including, but
not limited to, a temporary suspension of the permit, under terms
and conditions that he/she deems appropriate.
C. Effect
1. Upon an order of revocation by the General Manager becoming
final, the permittee shall permanently lose all rights to discharge
any wastewater containing FOG directly or indirectly to the
District's system. All costs for physical termination shall be paid
by the permittee.
2. Any owner or responsible management employee of the permittee
shall be bound by the order of revocation.
3. Any future application for a permit at any location within the
District by any person associated with an order of revocation will
be considered by the District after fully reviewing the records of
the revoked permit, which records may be the basis for denial of a
new permit.
4. An order of permit revocation issued by the General Manager
shall be final in all respects on the sixteenth (16th) day after it is
mailed to the permittee unless a request for hearing is filed with
the Board of Directors pursuant to Section 6.13 no later than 5:00
p.m. on the fifteenth (15th) day following such mailing.
6.6 DAMAGE TO FACILITIES OR INTERRUPTION OF NORMAL OPERATIONS
A. Any person who discharges any waste which causes or contributes to any
sewer blockage, SSOs, obstruction, interference, damage, or any other
impairment to the District's sewer facilities or to the operation of those
facilities shall be liable for all costs required to clean or repair the facilities
together with expenses incurred by the District to resume normal
operations. A service charge of twenty-five percent (25%) of District's
costs shall be added to the costs and charges to reimburse the District for
miscellaneous overhead, including administrative personnel and record
keeping. The total amount shall be payable within forty five (45) days of
invoicing by the District.
WS&S-0XS:pj:#1891 15:08/0h/04 35
B. Any person who discharges a waste which causes or contributes to the
District violating its discharge requirements established by any Regulatory
Agency incurring additional expenses or suffering losses or damage to
the facilities, shall be liable for any costs or expenses incurred by the
District, including regulatory fines, penalties, and assessments made by
other agencies or a court.
6.7 PUBLIC NUISANCE
Discharge of wastewater in any manner in violation of this Ordinance or of any
order issued by the FOG Control Program Manager or General Manager, as
authorized by this Ordinance, is hereby declared a public nuisance and shall be
corrected or abated as directed by the FOG Control Program Manager or
General Manager. Any person creating a public nuisance is guilty of a
misdemeanor.
6.8 TERMINATION OF SERVICE
A. The District, by order of the General Manager, may physically terminate
sewer service to any property as follows:
1. On a term of any order of suspension or revocation of a permit; or
2. Upon the failure of a person not holding a valid FOG Wastewater
Discharge Permit to immediately cease the discharge, whether
direct or indirect, to the District's sewer facilities after the notice
and process in Section 6.5 herein.
B. All costs for physical termination shall be paid by the owner or operator of
the Food Service Establishment or permittee as well as all costs for
reinstating service.
6.9 EMERGENCY SUSPENSION ORDER
A. The District may, by order of the General Manager, suspend sewer
service when the General Manager determines that such suspension is
necessary in order to stop an actual or impending discharge which
presents or may present an imminent or substantial endangerment to the
health and welfare of persons, or to the environment, or may cause
SSOs, sewer blockages, interference to the District's sewer facilities, or
may cause the District to violate any State or Federal Law or Regulation.
Any discharger notified of and subject to an Emergency Suspension
Order shall immediately cease and desist the discharge of all wastewater
containing FOG to the sewer system.
B. As soon as reasonably practicable following the issuance of an
Emergency Suspension Order, but in no event more than five (5)
business days following the issuance of such order, the General
Manager shall hold a hearing to provide the Food Service Establishment
or Permittee the opportunity to present information in opposition to the
issuance of the Emergency Suspension Order. Such a hearing shall not
ws&s-0xs:pi:#I89145:08/06/04 36
stay the effect of the Emergency Suspension Order. The hearing shall be
conducted in accordance with procedures established by the General
Manager and approved by the District's General Counsel. The General
Manager shall issue a written decision and order within two (2) business
days following the hearing, which decision shall be sent by certified mail
to the Food Service Establishment or its legal counsel/representative at
that Food Service Establishment's business address. The decision of the
General Manager following the hearing shall be final and not appealable
to the Board, but may be subject to judicial review pursuant to Section
6.16.
6.10 CIVIL PENALTIES
A. All users of the District's system and facilities are subject to enforcement
actions administratively or judicially by the District, U.S. EPA, State of
California Regional Water Quality Control Board, the County of Orange or
District Attorney. Said actions may be taken pursuant to the authority and
provisions of several laws, including but not limited to: (1) Federal Water
Pollution Control Act, commonly known as the Clean Water Act (33
U.S.C.A. Section 1251 et seq.); (2) California Porter-Cologne Water
Quality Control Act (California Water Code Section 13000 et seq.); (3)
California Hazardous Waste Control Law (California Health & Safety
Code Sections 25100 to 25250); (4) Resource Conservation and
Recovery Act of 1976 (42 U.S.C.A Section 6901 et seq.); and (5)
California Government Code, Sections 54739-54740.
B. In the event the District is subject to the payment of fines or penalties
pursuant to the legal authority and actions of other regulatory or
enforcement agencies based on a violation of law or regulation or its
permits, and said violation can be established by the District, as caused
by the discharge of any user of the District's system which is in violation
of any provision of the District's Ordinance or the user's permit, the
District shall be entitled to recover from the user all costs and expenses,
including, but not limited to, the full amount of said fines or penalties to
which it has been subjected.
C. Pursuant to the authority of California Government Code Sections 54739
- 54740, any person who violates any provision of this Ordinance; any
permit condition, prohibition or effluent limit; or any suspension or
revocation order shall be liable civilly for a sum not to exceed $25,000.00
per violation for each day in which such violation occurs. Pursuant to the
authority of the Clean Water Act, 33 U.S.C. Section 1251 et seq., any
person who violates any provision of this Ordinance, or any permit
condition, prohibition, or effluent limit shall be liable civilly for a sum not to
exceed $25,000.00 per violation for each day in which such violation
occurs. The General Counsel of the District, upon request of the General
Manager, shall petition the Superior Court to impose, assess, and recover
such penalties, or such other penalties as the District may impose,
assess, and recover pursuant to Federal and/or State legislative
authorization.
WS&S-OXS:pj:#1891-45:08/06/0-4 37
D. Administrative Civil Penalties
1. Pursuant to the authority of California Government Code Sections
54740.5 and 54740.6, the District may issue an administrative
complaint to any person who violates:
a) any provision of this Ordinance;
b) any permit condition, prohibition, or effluent limit; or
c) any suspension or revocation order.
2. The administrative complaint shall be served by personal delivery
or certified mail on the person and shall inform the person that a
hearing will be conducted, and shall specify a hearing date within
sixty (60) days following service. The administrative complaint will
allege the act or failure to act that constitutes the violation of the
District's regulations, the provisions of law authorizing civil liability
to be imposed, and the proposed civil penalty. The matter shall
be heard by the General Manager or his/her designee. The
person to whom an administrative complaint has been issued may
waive the right to a hearing, in which case a hearing will not be
conducted.
3. At the hearing, the person shall have an opportunity to respond to
the allegations set forth in the administrative complaint by
presenting written or oral evidence. The hearing shall be
conducted in accordance with the procedures established by the
General Manager and approved by the District's General Counsel.
4. If the General Manager designated a hearing officer, after the
conclusion of the hearing, the hearing officer shall submit a written
report to the General Manager setting forth a brief statement of
the facts found to be true, a determination of the issues presented,
conclusions, and a recommendation.
5. Upon receipt of the written report by the hearing officer, or
conclusion of the hearing if the General Manager conducted the
hearing, the General Manager shall make his/her determination
and should he/she find that grounds exist for assessment of a civil
penalty against the person, he/she shall issue his/her decision and
order in writing within thirty (30) calendar days after the conclusion
of the hearing .
6. If, after the hearing or appeal, if any, it is found that the person
has violated reporting or discharge requirements, the General
Manager or Board of Directors may assess a civil penalty against
that person. In determining the amount of the civil penalty, the
General Manager or Board of Directors may take into
consideration all relevant circumstances, including but not limited
to the extent of harm caused by the violation, the economic benefit
WS&S-0XS:pj:#189145:08/06/04 38
derived through any non-compliance, the nature and persistence
of the violation, the length of time over which the violation occurs,
and corrective action, if any, attempted or taken by the person
involved.
7. Civil penalties may be assessed as follows:
a) In an amount which shall not exceed two thousand dollars
($2,000.00) for each day for failing or refusing to furnish
required reports;
b) In an amount which shall not exceed three thousand
dollars ($3,000.00) for each day for failing or refusing to
timely comply with any compliance schedules established
by the District;
c) In an amount which shall not exceed five thousand dollars
($5,000.00) per violation for each day of discharge in
violation of any waste discharge limit, permit condition, or
requirement issued, reissued, or adopted by the District;
d) In any amount which does not exceed ten dollars ($10.00)
per gallon for discharges in violation of any suspension,
revocation, cease and desist order or other orders, or
prohibition issued, reissued, or adopted by the District;
8. An order assessing administrative civil penalties issued by the
General Manager shall be final in all respects on the thirty-first
(31 st) day after it is served on the person unless an appeal and
request for hearing is filed with the Board of Directors pursuant to
Section 6.13 no later than the thirtieth (30th) day following such
mailing. An order assessing administrative civil penalties issued
by the Board of Directors shall be final upon issuance.
9. Copies of the administrative order shall be served on the party
served with the administrative complaint, either by personal
service or by registered mail to the person at his/her/its business
or residence address, and upon other persons who appeared at
the hearing and requested a copy of the order.
10. Any person aggrieved by a final order issued by the Board of
Directors, after granting review of the order of the General
Manager, may obtain review of the order of the Board of Directors
in the superior court, pursuant to Government Code Section
54740.6, by filing in the court a petition for writ of mandate within
thirty (30) days following the service of a copy of the decision or
order issued by the Board of Directors.
11. Payment of any order setting administrative civil penalties shall be
made within thirty (30) days of the date the order becomes final.
w5&5-ox5:pi:#189145:08/06/W 39
The amount of any administrative civil penalties imposed shall
constitute a debt to the District.
12. No administrative civil penalties shall be recoverable for any
violation for which the District has recovered civil penalties
through a judicial proceeding filed pursuant to Government Code
Section 54740.
6.11 CRIMINAL PENALTIES
Any person who violates any provision of this Ordinance is guilty of a
misdemeanor, which upon conviction is punishable by a fine not to exceed
$1,000.00, or imprisonment for not more than 6 months, or both. Each violation
and each day in which a violation occurs may constitute a new and separate
violation of this Ordinance and shall be subject to the penalties contained herein.
6.12 APPEALS TO GENERAL MANAGER
A. Any Food Service Establishment, permit applicant or permittee affected
by any decision, action or determination made by the FOG Control
Program Manager or notice of violation issued by any District inspector
may file with the General Manager a written request for an appeal
hearing. The request must be received by the District within fifteen (15)
days of mailing of notice of the decision, action, or determination of the
FOG Control Program Manager to the appellant. The request for hearing
shall set forth in detail all facts supporting the appellant's request.
B. The General Manager shall, within fifteen (15) days of receiving the
request for appeal, designate a Department Head or other person to hear
the appeal and provide written notice to the appellant of the hearing date,
time and place. The hearing date shall not be more than thirty (30) days
from the mailing of such notice by certified mail to the appellant unless a
later date is agreed to by the appellant. If the hearing is not held within
said time due to actions or inactions of the appellant, then the staff
decision shall be deemed final.
C. At the hearing, the appellant shall have the opportunity to present
information supporting its position concerning the FOG Control Program
Manager's decision, action or determination. The hearing shall be
conducted in accordance with procedures established by the General
Manager and approved by the District's General Counsel.
D. After the conclusion of the hearing, the Department Head (or other
designee) shall submit a written report to the General Manager setting
forth a brief statement of facts found to be true, a determination of the
issues presented, conclusions, and a recommendation whether to uphold,
modify or reverse the FOG Control Program Manager's original decision,
action or determination. Upon receipt of the written report, the General
Manager shall make his/her determination and shall issue his/her
decision and order within thirty (30) calendar days of the hearing by
his/her designee. The written decision and order of the General Manager
ws&s-Oxs:pi:#1891 5:os/06/0w 40
shall be sent by certified mail to the appellant or its legal
counsel/representative at the appellant's business address.
The order of the General/City Manager shall be final in all respects on the
sixteenth (16th) day after it is mailed to the appellant unless a request for
hearing is filed with the Board of Directors pursuant to Section 6.13, no
later than 5:00 p.m. on the fifteenth day following such mailing.
6.13 APPEALS TO THE BOARD OF DIRECTORS
A. Any Food Service Establishment, permit applicant, or permittee adversely
affected by a decision, action, or determination made by the General
Manager may, prior to the date that the General Manager's order
becomes final, file a written request for hearing before the Board of
Directors accompanied by an appeal fee in the amount established by a
separate resolution of the District's Board of Directors. The request for
hearing shall set forth in detail all the issues in dispute for which the
appellant seeks determination and all facts supporting appellant's
request.
No later than sixty (60) days after receipt of the request for hearing, the
Board of Directors shall either set the matter for a hearing, or deny the
request for a hearing.
A hearing shall be held by the Board of Directors within sixty-five (65)
days from the date of determination granting a hearing, unless a later
date is agreed to by the appellant and the Board of Directors. If the
matter is not heard within the required time, due to actions or inactions of
the appellant, the General Manager's order shall be deemed final.
B. The Board of Directors shall grant all requests for a hearing on appeals
concerning permit suspension, revocation, or denial. Whether to grant or
deny the request for a hearing on appeals of other decisions of the
General Manager shall be within the sole discretion of the Board of
Directors.
C. The appeal fee shall be refunded if the Board of Directors denies a
hearing or reverses or modifies, in favor of the appellant, the order of the
General Manager. The fee shall not be refunded if the Board of Directors
denies the appeal.
D. After the hearing, the Board of Directors shall make a determination
whether to uphold, modify, or reverse the decision, action, or
determination made by the General Manager.
The decision of the Board of Directors shall be set forth in writing within
sixty-five (65) days after the close of the hearing and shall contain a
finding of the facts found to be true, the determination of issues
presented, and the conclusions. The written decision and order of the
Board of Directors shall be sent by certified mail to the appellant or its
legal counsel/representative at the appellant's business address.
WS&S-OXS:pj:#1891.15:()8/06/04 41
r
The order of the Board of Directors shall be final upon its adoption. In the
event the Board of Directors fails to reverse or modify the General
Manager's order, it shall be deemed affirmed.
6.14 PAYMENT OF CHARGES
A. Except as otherwise provided, all fees, charges and penalties established
by this Ordinance are due and payable upon receipt of notice thereof. All
such amounts are delinquent if unpaid forty-five (45) days after date of
invoice.
B. Any charge that becomes delinquent shall have added to it a penalty in
accordance with the following:
1. Forty-six (46) days after date of invoice, a basic penalty of ten
percent (10%) of the base invoice amount, not to exceed a
maximum of$1,000.00; and
2. A penalty of one and one-half percent (1.5%) per month of the
base invoice amount and basic penalty shall accrue from and after
the forty-sixth (46th) day after date of invoice.
C. Any invoice outstanding and unpaid after ninety (90) days shall be cause
for immediate initiation of permit revocation proceedings or immediate
suspension of the permit.
D. Penalties charged under this Section shall not accrue to those invoices
successfully appealed, provided the District receives written notification of
said appeal prior to the payment due date.
E. Payment of disputed charges is still required by the due date during
District review of any appeal submitted by permittees.
Collection of Delinquent Accounts
Collection of delinquent accounts shall be in accordance with the District's policy
resolution establishing procedures for collection of delinquent obligations owed to
the District, as amended from time to time by the Board of Directors. Any such
action for collection may include an application for an injunction to prevent
repeated and recurring violations of this Ordinance.
6.15 FINANCIAL SECURITY/AMENDMENTS TO PERMIT
A. Delinquent Accounts
The District may require an amendment to the permit of any Permittee
who fails to make payment in full of all fees and charges assessed by the
District, including reconciliation amounts, delinquency penalties, and
other costs or fees incurred by the Permittee.
B. Bankruptcy
WS&S-0X5:pi:#189145:08/06/04 42
Every Permittee filing any legal action in any court of competent
jurisdiction, including the United States Bankruptcy Court, for purposes of
discharging its financial debts or obligations or seeking court-ordered,
protection from its creditors, shall, within ten (10) days of filing such
action, apply for and obtain the issuance of an amendment to its permit.
C. Security
An amendment to a waste discharge permit issued, may be conditioned
upon the Permittee depositing financial security in an amount equal to the
average total fees and charges for two (2) calendar quarters during the
preceding year. Said deposit shall be used to guarantee payment of all
fees and charges incurred for future services and facilities furnished by
District and shall not be used by the District to recover outstanding fees
and charges incurred prior to the Permittee filing and receiving protection
from creditors in the United States Bankruptcy Court.
D. Return of Security
In the event the Permittee makes payment in full within the time
prescribed by this Ordinance of all fees and charges incurred over a
period of two (2) years following the issuance of an amendment to the
permit, the District shall either return the security deposit posted by the
Permittee or credit their account.
6.16 JUDICIAL REVIEW
A. Pursuant to Section 1094.6 of the California Code of Civil Procedure, the
District hereby enacts this part to limit to ninety (90) days following final
decisions in adjudicatory administrative hearings the time within which an
action can be brought to review such decisions by means of
administrative mandamus.
B. Definitions
As used in this Section, the following terms and words shall have the
following meanings:
1. Decision shall mean and include adjudicatory administrative
decisions that are made after hearing, or after revoking,
suspending, or denying an application for a permit.
2. Complete Record shall mean and include the transcript, if any
exists, of the proceedings, all pleadings, all notices and orders,
any proposed decision by the District's officers, agents, or
employees, the final decision, all admitted exhibits, all rejected
exhibits in the possession of the District or its officers, agents or
employees, all written evidence, and any other papers in the case.
C. Time Limit for Judicial Review. Judicial review of any decision of the
District or its officer or agent may be made pursuant to Section 1094.5 of
WS&S-OXS:pj:#189145:08/06/04 43
the Code of Civil Procedure only if the petition for writ of mandate is filed
not later than the ninetieth (9Oth) day following the date on which the
decision becomes final. If there is no provision for reconsideration in the
procedures governing the proceedings or if the date is not otherwise
specified, the decision is final on the date it is made. If there is provision
for reconsideration, the decision is final upon the expiration of the period
during which such reconsideration can be sought; provided that if
reconsideration is sought pursuant to such provision the decision is final
for the purposes of this Section on the date that reconsideration is
rejected.
D. The complete record of the proceedings shall be prepared by the District
officer or agent who made the decision and shall be delivered to the
petitioner within ninety (90) days after he/she has filed written request
therefor. The District may recover from the petitioner its actual costs for
transcribing or otherwise preparing the record.
E. If the petitioner files a request for the record within ten (10) days after the
date the decision becomes final, the time within which a petition, pursuant
to Section 1094.5 of the Code of Civil Procedure, may be filed shall be
extended to not later than the thirtieth (3Oth) day following the date on
which the record is either personally delivered or mailed to the petitioner
or the petitioner's attorney of record, if appropriate.
F. In making a final decision, the District shall provide notice to the party that
Section 1094.6 of the Code of Civil Procedure governs the time within
which judicial review must be sought.
G. Notwithstanding the foregoing in this Section 6.16, and pursuant to
Government Code Section 54740.6, judicial review of an order of the
Board of Directors imposing administrative civil penalties pursuant to
Section 6.10.D may be made only if the petition for writ of mandate is filed
not later than the thirtieth (30th) day following the day on which the order
of the Board of Directors becomes final.
WS&S-OX5:pj:#189145:08/06/04 44
1•
ARTICLE 7 - SEVERABILITY
If any section, subsection, subdivision, sentence, clause or phrase of this Ordinance is
for any reason held to be unconstitutional or otherwise invalid, such invalidity shall not
affect the validity of this entire Ordinance or any of the remaining portions hereof. The
Board of Directors hereby declares that it would have passed this Ordinance, and each
section, subsection, subdivision, sentence, clause or phrase hereof, irrespective of the
fact that any one or more sections, subsections, subdivisions, sees, clauses or phrases
be declared unconstitutional or otherwise invalid.
ARTICLE 8 - CALIFORNIA BUILDING STANDARDS LAW FINDINGS
Pursuant to the provisions of the California Building Standards Law, California Health
and Safety Code §§ 18941.5, 17958, 17958.5 and 17958.7, the Board hereby finds that
the amendments to the State Building Standards and Housing Laws, more particularly
the California Plumbing Code, adopted herein are necessary because of climatic,
geological or topographical conditions of property in the District's jurisdiction, and as
more specifically described below.
A. Articles 2 and 4 modify the authority and discretion of the "Administrative
Authority" of Section 1014.1 of the 2001 California Plumbing Code by
requiring all Food Service Establishments to install and operate a grease
control device, which may be a grease interceptor or grease trap, if no
other device, mechanism, or process is found to successfully trap or
collect or treat FOG prior to it being discharged into the sewer system.
B. Article 4 modifies the general maintenance requirements for grease
interceptors of Section 1014.6 of the 2001 California Plumbing Code and
establishes more specific maintenance requirements.
FINDINGS FOR "A" AND "B": The District's topography and geography
that has created the Santa Ana Watershed and the District's proximity to
the Pacific Ocean coupled with the general waste discharge requirements
imposed by the RWQCB require the strict compliance with grease control
device regulations to prevent sewer system overflows that threaten the
health and safety of the public within the immediate vicinity of the
overflow and downstream to the local beaches.
C. ADMINISTRATIVE-PROCEDURAL AMENDMENTS. Additional
amendments and deletions to the California Plumbing Code are found to
be administrative or procedural and are found to be reasonable and
necessary to safeguard life and property within the District.
w5&5-0x5:pi:#189145:08/06/04 45
7
ARTICLE 9 - FILING WITH CALIFORNIA BUILDING STANDARDS COMMISSION
A copy of this Ordinance shall be filed with the California Building Standards
Commission and the California Department of Housing and Community Development by
the Secretary of the Board as required by State law (Health & Safety Code Section
17958.7).
ARTICLE 10 - EFFECTIVE DATE
This Ordinance shall take effect immediately upon its adoption and a summary shall be
published in a newspaper of general circulation as provided by law.
PASSED AND ADOPTED by the Board of Directors of Orange County Sanitation District
this day of 2004.
Chair, Board of Directors
Orange County Sanitation District
Attest:
Secretary of the Board of Directors
Orange County Sanitation District
Thomas L. Woodruff, General Counsel
Orange County Sanitation District
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1004\Item 16.FOG Ordinance-Aft 1.doc
ws&s-Oxs:pi:#1 R9145:08/06/cu 46
V�JNjV SANI>gT/Oy
= 9
c
'•�' C Cf
,+.i.l."`F ��••_ ��7 .. •t Fcl/NG 7HE ENv\Po�
L
-
1 � .1 � -- � 'l u�¢♦ ��1i �
• _iris" •� � �r ��• � �t I •.♦ \
OCSD
1954-2004 Proudly Protecting the Environment for 50 Years
OrangeFirst Quarter Ended
September 30 , 2004
County Sanitation District, California
Ved Table of Contents
Section 1 - Overview........................
Section 2 -Joint Operating Budget Review
Chart of the Cost per Million Gallons by Department— Budget and Actual............................1
Chart of the Net Expenses by Major Category— Budget and Actual.....................................1
Divisional Contributions to Gallonage Charge.......................................................................2
du, Comparison of Expenses by Department..............................................................................3
Summary of Expenses by Major Category.....................................................
Summary of Joint Operating Revenues by Line Item............................................................5
Summary of Expenses by Line Item......................................................................................6
Summary of Expenses by Treatment Process......................................................................8
Chartof Staffing Trends........................................................................................................9
Section 3 - Capital Improvement Program Review
Capital Improvement Program Graphs by Type and Funding Source...................................1
Summary of Capital Improvement Construction Requirements - Current Year.....................2
ON Summary of Capital Improvement Construction Requirements - Project Life........................6
Section 4 - Budget Review by Revenue Area
Summary Budget Reviews -All Revenue Areas ...................................................................1
1!0 Consolidated Revenue Area Budget Review.........................................................................2
Revenue Area No. 14 Budget Review ..................................................................................3
Section 5—Self Insurance Budget Review
General Liability and Property Fund Budget Review.............................................................1
Workers' Compensation Fund Budget Review......................................................................2
i�
FY 2004-05 First Quarter Report
r
r�
This Page Intentionally Left Blank
L4
Overview
First Quarter Financial Report
September 30,.2004
The Finance Department is pleased to present the FY 2004-05 first quarter
l comprehensive financial report. This report provides the Directors, staff, and the
general public with a comprehensive overview of the financial condition of the District
and reports on the status of all capital projects in progress. A summary of the sections
�J contained within this report is provided below.
Joint Operating Budget Review: At September 30, 2004, 22.01 percent, or$18.41
million of the FY 2004-05 net joint operating budget of $83.61 million has been
expended. Net operating expenses decreased by $403,000 from the same period last
year. Total joint operating expenses are $19.36 million after cost allocation to revenue
t' areas and capital improvement projects, and are essentially the same as at September
30, 2003, with a variance of only 0.58 percent.
r•i The total cost per million gallons at September 30, 2004, is $844.60 based on flows of
21.79 billion gallons, or 236.88 million gallons per day. This is $71.72, or 7.83 percent
less than the budgeted cost per million gallons of $916.32. This lower cost per million
,..► gallons is primarily due to net expenses being 11.95 percent less than the proportionate
budget through September 30, 2004. This is somewhat offset by flows being 5.25
percent lower than the budgeted 250 million gallons per day.
ask
Some of the significant joint operating results as of September 30, 2004 include:
Salaries, Wages and Benefits— Overall, personnel costs are near to being on target
at 22.57 percent of budget through September 30, while staffing is 51 full-time
equivalents (FTE's), or 8.11 percent below the total 629 FTE's approved in the
�. 2004-05 budget. Net joint operating personnel costs are expected to approximate
budget throughout the remainder of the year.
Memberships— Membership expense totaled $144,200, or 48.88 percent of the
• $295,010 budget as of September 30 because many of the District's memberships
are paid in the first quarter of each year. These costs are expected to approximate
budget at year-end.
• Training & Meetings—As of September 30, training and meetings costs totaled
$156,700, or 15.63 percent of the $1,002,760 budget. These costs are
proportionately low through the first quarter because many of the training programs
are in the development stage. Training and meeting expenses are expected to
increase throughout the remainder of the year and are projected to approximate
budget at year-end.
b
Section 1 - Page 1
FY 2004-05 First Quarter Report
�1.
This Page Intentionally Left Blank
�1
l
I .
W
4 �
Section 1 - Page 6
.eJ
Overview
First Quarter Financial Report
September 30,.2004
The Finance Department is pleased to present the FY 2004-05 first quarter
comprehensive financial report. This report provides the Directors, staff, and the
general public with a comprehensive overview of the financial condition of the District
and reports on the status of all capital projects in progress. A summary of the sections
contained within this report is provided below.
Joint Operating Budget Review: At September 30, 2004, 22.01 percent, or$18.41
million of the FY 2004-05 net joint operating budget of $83.61 million has been
expended. Net operating expenses decreased by $403,000 from the same period last
year. Total joint operating expenses are $19.36 million after cost allocation to revenue
areas and capital improvement projects, and are essentially the same as at September
30, 2003, with a variance of only 0.58 percent.
The total cost per million gallons at September 30, 2004, is $844.60 based on flows of
21.79 billion gallons, or 236.88 million gallons per day. This is $71.72, or 7.83 percent
less than the budgeted cost per million gallons of $916.32. This lower cost per million
•r gallons is primarily due to net expenses being 11.95 percent less than the proportionate
budget through September 30, 2004. This is somewhat offset by flows being 5.25
percent lower than the budgeted 250 million gallons per day.
Some of the significant joint operating results as of September 30, 2004 include:
• Salaries, Wades and Benefits—Overall, personnel costs are near to being on target
at 22.57 percent of budget through September 30, while staffing is 51 full-time
equivalents (FTE's), or 8.11 percent below the total 629 FTE's approved in the
2004-05 budget. Net joint operating personnel costs are expected to approximate
budget throughout the remainder of the year.
Memberships— Membership expense totaled $144,200, or 48.88 percent of the
$295,010 budget as of September 30 because many of the District's memberships
are paid in the first quarter of each year. These costs are expected to approximate
budget at year-end.
• Training & Meetings—As of September 30, training and meetings costs totaled
$156,700, or 15.63 percent of the $1,002,760 budget. These costs are
proportionately low through the first quarter because many of the training programs
are in the development stage. Training and meeting expenses are expected to
increase throughout the remainder of the year and are projected to approximate
budget at year-end.
Section 1 - Page 1
FY 2004-05 First Quarter Report
• Operating Expenses—Overall operating expenses were near the proportionate
budget through September 30 and totaled $3,311,200, or 23.83 percent of the
composite $13,893,270 budget. Other than personnel costs, the operating expense
category is the largest expense item in the operating budget, and chemicals
comprise the majority of these operating expenses. Based on current processes,
chemical costs are anticipated to parallel the budget throughout the remainder of the
year and to be at or below budget at year-end. 6W
• Contractual Services— Overall costs for contractual services were slightly lower than
the proportionate budget through September 30 and totaled $2,816,200, or 22.97
percent of the composite $12,262,500. Solids removal costs comprise the majority
of this expense category. Costs are anticipated to be at or below budget at year-
end.
• Professional Services— Overall professional services totaled $412,300, or 13.82
percent of the composite $2,984,130 budget. Legal and Audit & Accounting '•`
categories are all higher than the proportionate budget through September 30, due
to the timing of when the services are provided. The other professional services are
all proportionately low through September 30 due to being in the planning stages. It W
is anticipated that the overall costs for this category will increase in the second and
third quarters of the fiscal year.
ftw
• Utilities— Utilities costs totaled $1,511,300, or 27.59 percent of the composite
$5,476,950 budget. These costs are proportionately high through September 30
due to higher than anticipated costs for natural gas. However, it is anticipated that
the overall utilities category will approximate budget at year-end.
• Revenues—Through September 30, revenues totaled $956,300, or 31.88 percent of
the $3,000,000 budget. The largest joint operating revenue is the Interdistrict Sewer ;
Charge to the Santa Ana Watershed Protection Agency for treatment of flows. This
revenue totaled $527,700 at September 30, or 32.98 percent of the $1,600,000
budgeted revenue, due to higher than anticipated discharges into the treatment
system.
i `
Section 1 - Page 2
1�:i
Overview
Comparison of First Quarter Cost per Million Gallon Results
With Year-End Actuals (Budget)
Last Five Years
91632
950
882 91
r1
84460
875 -123,82
800
13032
725
650
563.0:�
r.r _
575 512.78 523 53
473.76
500
425
00-01 01-02 02.03 03-04 04-05
.w 1st Year tsl Year 1st Year 1st Year 1st Annual
OR end Qtr end Olr end Qtr end Qtr Budget
As demonstrated in the preceding graph, the cost per million gallons at the end of the
first quarter for each of the last four years has been between 6.7 percent and 9.5
percent of year-end totals. The cost comparison for the first quarter of 2004-05 is
consistent with this trend when compared with this year's budget.
Section 2 - Page 1 provides a graphical comparison of each Department's actual
contribution towards the gallonage charge through the first quarter of FY 2004-05 and
as budgeted for FY 2004-05. Page 1 also provides a budget to actual graphical
comparison of revenues and expenses by major category.
^' More detailed information is provided at the following locations: Section 2 - Page 2
provides for the divisional contributions to the gallonage charge through the first quarter
for the current and two prior years; Section 2 — Page 3 provides a comparison of
expenses by department through September 30 for the current and two prior years;
Section 2 — Page 4 provides a summary of expenses by major category through
September 30, 2004 and 2003; Section 2 — Page 5 provides a summary of joint
operating revenues by line item through September 30, 2004 and 2003; Section 2 —
pages 6 and 7 provide a summary of expenses by line item through September 30,
2004 and 2003; Section 2 — Page 8 provides a summary of expenses by treatment
process through September 30, 2004 and 2003; Section 2 — Page 9 provides staffing
trends over the last five years including total positions authorized, actual positions filled,
and vacant positions.
Section 1 - Page 3
FY 2004-05 First Quarter Report
Capital Outlay Review:
$250,000,000 ..�
$200,000,000
S150,000,000
$100,000,000
S50,000,000
so
9/30/04 Actual Projected 2004-05 2004-05 Capital Outlay
Capital Outlay Capital Outlay Cashflow Budget
$46,071,300 $232,069.500 S231,223,600 �►
As depicted by the preceding chart, Capital Outlay expenditures totaled $46,071,300 or
19.92 percent of the capital outlay cashflow budget for FY 2004-05 as of September 30,
2004. Costs are proportionately low through the first quarter as many projects are still
in the design phase or have experienced various delays. Capital outlay costs are W.
expected to be $232,069,500, approximately 100 percent of budget at year-end.
Section 3 - Page 1 provides a graphical presentation on the dollar amount of capital
expenditures incurred for each process category and a graphical presentation on the
dollar amount of capital expenditures incurred for each major capital improvement
funding source.
For more detailed information, Section 3 — Pages 2 through 5 provide a summary of the
construction requirements of each project for the current year and Section 3 — Pages 6
through 9 provide a summary of the construction requirements of each project over the
project life.
Budget Review by Revenue Areas: At September 30, 2004, revenues from all
Revenue Areas totaled $19,706,000, or 10.17 percent of budget. Tax allocation and
subvention revenue and Other User Fees comprise the largest part of the revenue ..
budget and are at 11 .41 percent and 4.04 percent of the budget, respectively. These
revenues are proportionately low through the first quarter because most of the property
tax apportionment and user fee receipts are collected by the County through the
property tax roll and are not distributed to the District until after the first quarter of each
year. These revenues are anticipated to approximate budget at year-end.
Capital Facilities Capacity Charges, budgeted at $11 .56 million, are at 6.52 percent of
budget. These fees are proportionately low through the first quarter due to lower than
anticipated building activity within the member cities. No current year sale of capacity
rights has occurred as of September 30, 2004. Interest earnings, budgeted at $32.18
Section 1 - Page 4
Overview
million, are at 21.15 percent of budget. Interest earnings are anticipated to approximate
budget at year-end.
,.� Conversely, the capital assessment to the Irvine Ranch Water District, budgeted at $8.4
million is at 53.00 percent of the budget at September 30, 2004. By year-end, this
assessment to the Irvine Ranch Water District is expected to exceed the budgeted
amount by approximately$2.6 million.
Expenses and outlays of all Revenue Areas totaled $86.52 million, or 22.81 percent of
budget through the first quarter. The costs incurred related to capital improvement
projects are proportionately low at $46.07 million or 19.92 percent of budget, as
previously explained in the Capital Outlay Section.
The overall costs of the Revenue Area programs are at 16.81 percent of the composite
program budget of$22.61 million. These costs are proportionately low through the first
quarter mainly because the grants paid to participating agencies are in the planning
stages. The overall costs of the Revenue Area programs are anticipated to
approximate budget by year-end.
w
As previously stated, joint works operating expenses of the Revenue Areas are at 22.01
percent of the budget, and are anticipated to approximate budget at year-end. The
costs related to the District's outstanding Certificates of Participation are at 43.51
percent of budget because the annual principal payments are due during the first
quarter of the fiscal year.
Self-Insurance Budget Reviews: The District is self-insured for portions of workers'
compensation, property damage, and general liability. Separate fund accounting is
utilized for the recording of revenue and expenses incurred in managing these liability
claims. The revenues to these funds represent individual Revenue Area contributions
based on flows. Expenses to these funds include actual claims paid, claims
''W administration, and excess loss policies.
The Self-Insurance Fund revenues totaled $450,700 or 24.40 percent of the $1,846,600
budget at September 30, while total expenses were $510,400 or 27.21 percent of the
$1,876,000 budget.
low
MW
Section 1 - Page 5
,
FY 2004-05 First Quarter Report
f
This Page Intentionally Left Blank
� r
� 1
Section 1 - Page 6
w
Joint Operating Budget Review
Cost per Million Gallons by Department
Budget and Actual
September 30, 2004
r
$750
$700 -
$650 -
$600 -I i
$550 -
$500
$450
$400
$350
$300
$250
$200 - - — -
$150 � - — —
$100 -
50
$$0 z -
Executive Finance Human Technical Engineering Operations& Information
Management Resources Services Maintenance Technology
■Budget ■Actual
r.
" Net Expenses by Major Category
Budget and Actual (in thousands)
September 30, 2004
$55,000 I� -
$50,000 - - — -
$45.000
$40,000 — - - -
$35,000 - - _
.. $30,000
$25.000
$20.000
S15,000
S 10,000
$5,0$0 - - - -�
0 air'-' > ot$ O y CJ j y C N C d N > O 7
J � C - N
�cc C N �. A C C ct7 C U U_ rj 2 ` t'J = C ✓J f9 C
m n d a x v
¢ a:E aw ¢
m > a r a
E < O U
in n
w
■Budget ■Actual
Section 2 - Page 1
2004-05 First Quarter Report )
Summary of Expenses by Treatment Process ir1.
For the Three Months Ended September 30, 2004
}j
Increase Increase V
Actual Actual (Decrease) (Decrease)
9/30104 9130103 $ % {
Treatment Process: WL
Preliminary Treatment $ 1,402,479 $ 1,224,904 $ 177,575 14.50%
Primary Treatment 1,915,638 1,220,495 695,143 56.96%
Secondary Treatment 1,341,989 2,119,011 (777,022) -36.67% S j
Cryogenic Plant(Plant 2) 143,114 136,571 6,543 4.79% I�,L
Effluent Disposal 130,304 225,360 (95,056) -42.18% (�
Solids Handling 6,031,250 7.582,425 (1,551,175) -20.46%
Cogeneration 2,611,296 1,984,630 626,666 31.58%
Utilities 2,606,991 1,320,774 1,286,217 97.38% 1
Electrical Distribution 316,376 175,379 140,997 80.40%
Miscellaneous Buildings 882,960 1,616,044 (733,084) -45.36%
Air Quality 468,627 396,010 72,617 18.34%
Laboratory 1,511,567 1,474,078 37,489 2.54% fL•tl
Net Joint Operating Requirements 19,362,591 19,475,681 (113,090) -0.58%
Less: Revenues (956,281) (666,483) (289,798) 43.48%
Net Joint Operating Expenses $ 18,406,310 $ 18,809,198 $ (402,888) -2.14%
del
Vn1
4�
J
Section 2-Page 8
Joint Operating Budget Review
Cost per Million Gallons by Department
Budget and Actual
September 30, 2004
$750
$700
• $650 - - -
$600 - -
$550 - -
$500
w $450 - -
$400 -
$350
$300 - - -
$250 -
$200 -
$10
$100 Ilt
$$0 -
Executive Finance Human Technical Engineering Operations& Information
Management Resources Services Maintenance Technology
IN Budget ■Actual
Net Expenses by Major Category
Budget and Actual (in thousands)
September 30,2004
$55,000
$50,000
$45,000-
$40,000 -I -
R $35.000
$30.000
$25,000 -
Yr $20,000 -
S15,000 - - - —
$10,000 . - -
$5,OS0
0
N >CD
.0 p `6 N C 0 6 y N °6 CD U N _N U O U7
N Of 01 W C 0 t C �tS _
..r c9 O ro d lb C C f0 C U U O N ` N (9 = Cn C9 C
C
m ° m c 6 ai a s .Z N Z a0i E m CD ° �s o >
d Fji Ow 0 (0 o � aN 0 aa� Q Cr
Z E X a U ¢ ¢ m
o ¢ a L a o
Cz
CI U
cn E p m
w
IN Budget ■Actual
'- Section 2- Page 1
2004-05 First Quarter Report
Summary of Expenses by Line Item
For the Three Months Ended September 30,2004 i -
Expense %Expense Expense Increase Increase
Budget Through Through Remaining Through (Decrease) (Decrease)
Description 2004-05 9/30/04 9/30/04 Budget 9/30/03 $ %
Salaries,Wages&Benefits
Salaries&Wages $ 49,954,650 $ 11,375,563 22.77% $ 38,579,087 $ 9,998,919 $1,376,644 13.77%
Employee Benefits
Retirement 7,962,800 1,918,270 24.09% 6,044,530 1,142,003 776,267 67.970/6
Group Insurances 6,699,900 1,274,691 19.03% 5,425,209 1,262,994 11,697 0.93%
Tuition&Certification Reimb 100,000 18,741 18.74% 81,259 10,739 8,002 74.51%.
Uniform Rental 72,200 16,556 22.93% 55,644 18,844 (2,288) -12.14%
Workers'Compensation 700,000 175,000 25.00% 525,000 249,999 °
Unemployment Insurance 11,800 5,110 43.31% 6,690 - 5,110 WA
Total Benefits 15,546,700 3,408,368 21.92% 12,138,332 2,684,579 723,789 26.96%
Salaries,Wages&Benefits 65,501,350 14,783,931 22.57% 50,717,419 12,683,498 2,100,433 16.560/6
Matl.Sunaly.&Services
Administrative Expenses
Memberships 295,010 144,214 48.88% 150,796 172,185 (27,971) -16.24%
Office Exp-Supplies 151,250 26,650 17.62% 124,600 28,504 (1,854) -6.50%
Office Expense-Other 94,200 24,187 25.68% 70,013 18,784 5,403 28.76%
Small Computer Items 574,000 129,392 22.54% 444,608 49,919 79,473 159.20%
Minor Furniture&Fixtures 176,100 17,221 9.780/6 158,879 48,769 (31,548) -64.69%
Subtotal 1,290,560 341,664 26.47% 948,896 318,161 23,503 7.39%
Printing&Publication
� i
Repro-In-House 297,700 47,120 15.83% 250,580 82,315 (35,195) -42.76% }„(_
Printing-Outside 61,350 12,724 20.74% 48,626 5,716 7,008 122.60%
Notices&Ads 39,750 6,343 15.96% 33,407 11,530 (5,187) -44.99%
Photo Processing 5,890 504 8.56% 5,386 2,214 (1,710) -77.24% j
Subtotal 404,690 66,691 16.48% 337,999 101,775 (35,094) -34.47%
Training&Meetings
Meetings 287,460 44,723 15.56% 242,737 51,246 (6,523) -12.73%
Training 715,300 112,020 15.66% 603,280 155,544 (43,524) -27.98%
Subtotal 1,002,760 156,743 15.63% 846,017 206,790 (50,047) -24.20% Yi1
Operating Expenses
Chemical Coagulants 4,935,200 1,038,862 21.05% 3,896,338 504,671 534,191 105.85%
Sulfide Control - - WA - 736,466 (736,466) -100.000/0
Odor Control 1,549,000 333,430 21.53% 1,215,570 291,767 41,663 14.28%
Disinfection 5,737,500 1,546,982 26.96% 4,190,518 1,306,971 240,011 18.36%
Chemicals-Misc&Cogen 44,000 2,321 5.28'/° 41,679 7,878 (5,557) -70.54%
Gasoline,Diesel&Oil 341,900 55,392 16.200/6 286,508 66,166 (10,774) -16.28%
Tools 266,290 49,053 18.42% 217,237 35,970 13,083 36.37%
Safety equipment/tools 249,650 34,137 13.67% 215,513 38,496 (4,359) -11.32%
Solv,Paints&Jan.Supplies 67,380 22,250 33.02% 45,130 21,375 875 4.090/6
Lab Chemicals&Supplies 506,250 189,617 37.46% 316,633 164,697 24,920 15.130/6 .
Other Operating Supplies 172,100 33,120 19.24% 138,980 48,644 (15,524) -31.91%
Property Tax Fees 24,000 6,038 25.160/6 17,962 - 6,038 N/A
Subtotal 13,893,270 3,311,202 23.83% 10,582,068 3,223,1 11 88,101 2.73% L
Contractual Services
Solids Removal 9,686,000 2,314,694 23.90% 7,371,306 2,518,307 (203,613) -8.09%
Other Waste Disposal 617,000 139,440 22.60% 477,560 156,685 (17,245) -11.01%
Groundskeeping 270.000 35,532 13.16% 234,468 42,223 (6,691) -15.85%
Janitorial 350,000 80,355 22.960/6 269,645 52,470 27,B85 53.14%
Outside Lab Services 238,000 22,438 9.43% 215,562 18,002 4,436 24.64%
Oxygen Plant Oper 342,000 81,294 23.77% 260,706 105,117 (23,823) -22.66%
Temporary Services 250,500 68,498 27.34% 182,002 107,910 (39,412) -36.52%
Security Services 245,000 65,018 26.54% 179,982 49,362 15,656 31.72%
Other 264,000 8,930 3.38% 255,070 30,92E (21,998) -71.13%
Subtotal 12,262,500 2,816,199 22.97% 9,446,301 3,081,004 (264,805) -8.59%
(Continued)
Section 2 - Page 6
L
Joint Operating Budget Review
Cost per Million Gallons by Department
Budget and Actual
September 30, 2004
$750 l
$700
$650 - -
�' $600 —
$550 - - -
$500 --- --
^ $450
$400
$350
r
$300
$250
$200
$10 -
$100
$30
Executive Finance Human Technical Engineering Operations& Information
Management Resources Services Maintenance Technology
IN Budget ■Actual
Net Expenses by Major Category
Budget and Actual (in thousands)
September 30,2004
$55,000
$50,000 -
-� $45,000
$40,000
$35,000
" $30,000
$25,000
$20,000 --
$15,000
$10.000
S5,0$$00 - -� -
C] > N mC0 N 0 N OC V)
C7 Ta C o!1
d tN ja p
>II a)
C o
V CL a cc a)Ca wocn 2 a o Q
r
i CL
O cn U
E
w
IN Budget IN Actual
Section 2 - Page 1
2004-05 First Quarter Report
Summary of Expenses by Major Category
For the Three Months Ended September 30, 2004
1 !
Expense Expense Increase Increase Percent
Budget Through Through (Decrease) (Decrease) Budget Remaining
Description 2004-05 9/30/04 9/30/03 $ %, Realized Budget i
f
Salary&Wages $49,954,650 $11,375,563 $ 9,998,919 $ 1,376,644 13.77% 22.77% $38,579,087 u
Employee Benefits 15,546,700 3,408,368 2,684,579 723,789 26.96% 21.92% 12,138,332
Administrative Expenses 1,290,560 341,664 318,161 23,503 7.39% 26.47% 948,896
Printing&Publication 404,690 66,691 101,775 (35,084) -34,47% 16.48% 337,999
Training&Meetings 1,002,760 156,743 205,790 (50,047) -24.20% 15.63% 846,017 I�•!!
Operating Expenses 13,893.270 3,311,202 3,223,101 88,101 2.73% 23.83% 10,582,068
Contractual Services 12,262,500 2,816,199 3,081,004 (264,805) -8.59% 22.97% 9,446.301
Professional Services 2,984,130 412,340 544,479 (132,139) -24.27% 13.82% 2,571,790 j
Research&Monitoring 1,223,900 292,814 416,074 (123,260) -29.62% 23.92% 931,086
Repairs&Maintenance 7,353,250 1,907,812 1,791,111 116,701 6.52% 25.95% 5,445,438
Utilities 5,476,950 1,511,295 1,368,199 143,096 10.46% 27.59% 3,965,655
Other Materials,Supplies, �(
and Services 1,300,420 198,753 339,040 (140,287) -41.38% 15.28% 1,101,667
Net Cost Allocation (26,079,640) (6,436,853) (4,597,551) (1,839,302) 40.01% 24.68% (19,642,787)
Net J.O. Requirements 86,614,140 19,362,591 19,475,681 (113,090) -0.58% 22.36% 67,251,549
Revenues (3,000,000) (956,281) (666,483) (289,798) 43.48% 31.88% (2,043,719) 1
NetJ. O. Expenses $83,614,140 $18,406,310 $18,809,198 $ (402,888) -2.14% 22.01% $65,207,830 �f
Gallonage Flow(MG) 91,250.00 21,793.00 22,831.79 (1,038.79) -4.55%
Gallonage Flow(MGD) 250.00 236.88 248.17 (11.29) -4.55%
Gallonage Flow($'s/MG) $916.32 $844.60 $823.82 $20.78 2.52% L
I
>
Section 2- Page 4
Ii
iv
Joint Operating Budget Review
Cost per Million Gallons by Department
Budget and Actual
y September 30,2004
$750 —
$700
$650
$600
$550
$500
S450
$400 -
$350
$300
$250
$200
S150
$100 r - 1
$
$0 =�-� -
Executive Finance Human Technical Engineering Operations& Information
Management Resources Services Maintenance Technology
■Budget IN Actual
Net Expenses by Major Category
Budget and Actual (in thousands)
September 30, 2004
$55,000
., $50,000 -
$45,000
$40,000
$35,000
$30,000
$25,000
$20,000
$15,000
$10,000
$5,000-
$0 - —7,w—
N V M CM _ y V O U - C ._ fJ > V V
j C M C r C C `J C U V ` c9 = U) �J C
n V m y .V O
m � m `0 'Fa ? °C, a
.E�2 CD
.- ¢
Tw v
O a D_ .
a0�
¢
`9 E O U
w
■Budget ■Actual
Section 2 - Page 1
f
2004-05 First Quarter Report
Summary of Expenses by Major Category !
For the Three Months Ended September 30,2004
Expense Expense Increase Increase Percent
Budget Through Through (Decrease) (Decrease) Budget Remaining
Description 2004-05 9/30/04 9/30/03 $ % Realized Budget
Salary&Wages $49,954,650 $11,375,563 $ 9,998.919 $ 1.376.644 13.77% 22.77% $38,579,087
Employee Benefits 15,546,700 3,408,368 2,684,579 723,789 26.96% 21.92% 12,138,332
Administrative Expenses 1,290,560 341,664 318,161 23,503 7.39% 26.47% 948,896
Printing&Publication 404,690 66,691 101,775 (35,084) -34.47% 16.48% 337,999 I�
Training&Meetings 1,002,760 156,743 206,790 (50,047) -24.20% 15.63% 846,017
Operating Expenses 13,893,270 3,311,202 3.223,101 88,101 2.73% 23.83% 10,582,068
Contractual Services 12,262,500 2,816,199 3,081,004 (264,805) -8.59% 22.97% 9,446,301
Professional Services 2,984,130 412,340 544,479 (132,139) -24.27% 13.82% 2,571,790
Research&Monitoring 1,223,900 292,814 416,074 (123,260) -29.62% 23.92% 931,086
Repairs&Maintenance 7,353,250 1,907,812 1,791,111 116,701 6.52% 25.95% 5,445,438
Utilities 5,476,950 1,511,295 1,368,199 143,096 10.46% 27.59% 3,965,655
Other Materials,Supplies,
and Services 1.300,420 198,753 339,040 (140,287) -41.38% 15.28% 1,101,667
Net Cost Allocation (26,079,640) (6,436,853) (4,597.551) (1,839,302) 40.01% 24.68% (19.642,787)
Net J.O. Requirements 86,614,140 19,362,591 19,475,681 (113,090) -0.58% 22.360/6 67,251,549
Revenues (3,000,000) (956,281) (666,483) (289,798) 43.48% 31.88% (2,043,719)
Net J.O. Expenses $83,614,140 $18,406,310 $18,809,198 $ (402,888) -2.14% 22.01% $65,207,830
Gallonage Flow(MG) 91,250.00 21,793.00 22,831.79 (1,038.79) 4.55%
Gallonage Flow(MGD) 250.00 236.88 248.17 (11.29) -4.55% A
i
Gallonage Flow($'s/MG) $916.32 $844.60 $823.82 $20.78 2.52%
7
f
n
Section 2-Page 4
i
Joint Operating Budget Review
Cost per Million Gallons by Department
Budget and Actual
September 30, 2004
$750
.� $700
$650
$600
tQ $550 —
$500
S450
$400
$350
$300
$250
$200 s
$150
$100 -
S� ®-
Executive Finance Human Technical Engineering Operations& Information
Management Resources Services Maintenance Technology
■Budget ■Actual
Net Expenses by Major Category
Budget and Actual (in thousands)
September 30, 2004
$55.000
$50.000
S45,000 — ——
$40,000
$35.000
$30,000
$20,000
$15,000
$10,000
00
..r $5 OSO _y y —� — — — —
N > N O m OI CP N O N C N cn at7 V m N U O O
L >
3 c H c o m = c U7 m c
°� y c c E z N CO, L° Z �^ 'Z a0 tG m ° a o >
W E CLU L � � Q.
w �0 Cn o n Q 2o m <
m a < L a U
rn E p
w
■Budget ■Actual
Section 2 - Page 1
r+
2004-05 First Quarter Report V
Divisional Contributions to Gallonage Charge
For the Three Months Ended September 30,
2004-05 «�*
9/30102 9/30/03 Annual 9/30104
Actual Actual Budget Actual
Flow In Million Gallons 22,071.26 22,831.79 91,250.00 21,793.00
Flow in Million Gallons per Day 239.91 248.17 250.00 236.88 71
General Manager's Department
General Management Administration $ 17.08 $ 19.88 $ 16.48 $ 21.59
Administrative Services 9.04 8.64 9.06 5.79
Communications 6.56 6.33 9.58 9.69
Subtotal 32.68 34.85 35.12 37.07 --
Finance Department 14�*
Finance Administration 12.98 11.68 3.99 3.47
Accounting 17.20 18.33 22.64 21.92
Purchasing&Warehouse 14.17 15.86 22.16 20.17
Subtotal 44.35 45.87 48.79 45.56 f"
Human Resources Department
Human Resources Administration 5.49 8.85 11.56 10.56
Employee Development/Training 2.22 5.23 12.40 8.62
Safety and Health 7.67 9.43 18.67 12.94 j
Employee Services 5.32 6.41 8.24 6.39
Subtotal 20.70 29.92 50.87 38.51
Technical Services Department
Technical Services Administration 11.30 8.74 12.75 14.92
Environmental Assessment 32.12 40.77 29.54 25.18 -
Environmental Sciences Laboratory 46.60 48.42 57.62 58.32
Source Control 34.20 39.31 49.97 48.37
Environmental Compliance Services 15.98 16.51 31.43 28.36
Subtotal 140.20 153.75 181.31 175.15
Engineering Department
Engineering Administration 6.10 4.26 5.44 5.28
Planning 9.78 14.00 18.92 17.39 _
Project Management Office 12.41 13.80 20.85 17.21
Engineering and Construction 50.88 53.59 71.64 65.39
Subtotal 79.17 85.65 116.85 105.27
Operations& Maintenance Department
Operations& Maintenance Administration 4.98 5.00 7.30 7.27
O&M Process Engineering 15.14 16.03 24.95 20.68
Plant No. 1 Operations 102.94 147.91 154.89 151.44
Plant No. 2 Operations 153.19 203.84 214.34 213.56
Mechanical Maintenance&Power Production 102.83 133.52 135.25 150.90
Instrumentation&Electrical Maintenance 66.12 68.12 82.49 74.60
Collection Facilities Maintenance 17.93 22.26 63.62 28.84
Plant Facilities Maintenance 52.67 46.68 30.92 56.04
Subtotal 515.80 643.36 713.76 703.33
Information Technology Department
Information Technology Administration 7.22 2.89 3.61 3.52
Customer& Network Support 19.54 27.11 45.34 38.59
Programing& Database 11,97 16.70 18.68 17.72 7
Process Ctrl Integration 14.25 14.27 20.67 19.12
Subtotal 52.98 60.97 88.30 78.95
Total Joint Operating Expenses 885.88 1,054.37 1,235.00 1,183.84 r
Less: Cost Allocation (192.48) (201.36) (285.80) (295.36) I
Net Joint Operating Requirements 693.40 853.01 949.20 888.48
Less: Revenues (32.15) (29.19) (32.88) (43,88) r
Net Joint Operating Expenses $ 661.25 $ 823.82 $ 916.32 $ 844.60
r
Section 2- Page 2
I
Joint Operating Budget Review
Comparison of Expenses by Department
For the Three Months Ended September 30,
AIN
2004-05
9130102 9130103 Year to Date Budget%
Department and Division Actual Actual Budget 9/30104 Realized
°p General Manager's Department
General Management Administration $ 377,003 $ 453,992 $ 1,504,090 $ 470,514 31.28%
Administrative Services 199,593 197,375 826,730 126,210 15.27%
MR Communications 144,730 144,619 874,110 211,255 24.17%
Subtotal 721,326 795,986 3,204,930 807,979 25.21%
Finance Department
Finance Administration 286,513 266,656 363,740 75,597 20.78%
+�. Accounting 379,665 418,584 2,065,730 477,762 23.13%
Purchasing&Warehouse 312,802 362,055 2,021,980 439,558 21.74%
Subtotal 978,980 1,047,295 4,451,450 992,917 22.31%
Human Resources Department
Human Resources Administration 121,163 202,042 1,055,180 230,139 21.81%
Employee Development/Training 48,937 119,350 1,131,300 187,935 16.61%
Safety and Health 169,367 215,415 1,704,090 282,033 16.55%
Employee Services 117,420 146,349 752,240 139,243 18.51%
Subtotal 456,887 683,156 4,642,810 839,350 18.08%
Technical Services Department
Technical Services Administration 249,442 199,496 1,163,810 325,236 27.95%
Environmental Assessment 708,835 930,760 2,695,670 548,738 20.36%
Environmental Sciences Laboratory 1,028,453 1,105,518 5,258,100 1,270,914 24.17%
Source Control 754,849 897,476 4,559,660 1,054,131 23.12%
WA Environmental Compliance Services 352,722 376,858 2,868,440 617,951 21.54%
Subtotal 3,094,301 3,510,108 16,545,680 3,816,970 23.07%
Engineering Department
416 Engineering Administration 134,675 97,362 496,010 115,140 23.21%
Planning 215,932 319,537 1,726,360 379,032 21.96%
Project Management Office 273,840 315,161 1,902,650 374,961 19.71%
Engineering and Construction 1,123,035 1,223,643 6,536,930 1,425,129 21.80%
Subtotal 1,747,482 1,955,703 10,661,950 2,294,262 21.52%
Operations&Maintenance Department
Operations&Maintenance Administration 109,987 114,269 666,410 158,350 23.76%
O&M Process Engineering 334,163 366,023 2,276,500 450,751 19.80%
Plant No. 1 Operations 2,272.023 3,376,981 14,133,620 3,300,414 23.35%
Plant No.2 Operations 3,380,836 4,653,737 19,557,240 4,654,143 23.80%
Mechanical Maintenance&Power Production 2,269,675 3,048,528 12,341,330 3,288,488 26.65%
.,� Instrumentation&Electrical Maintenance 1,459,365 1,555,201 7,526,940 1,625,766 21.60%
Regional Assets&Services 395,814 508,192 5,805,570 628,509 10.83%
Facilities Maintenance 1,162,544 1,065,728 2,821,480 1,221,181 43.28%
Subtotal 11,384,407 14,688,659 65,129,090 15,327,602 23.53%
Information Technology Department
Information Technology Administration 159,256 66,096 329,000 76,618 23.29%
Customer&Network Support 431,377 619,008 4,137,630 841,014 20.33%
Programing&Database 264,139 381,310 1,704,830 386,158 22.65%
Process Ctrl Integration 314,621 325.911 1.886,410 416,574 22.08%
Subtotal 1,169,393 1,392,325 8,057,870 1,720,364 21.35%
Aw Total Joint Operating Expenses 19,552,776 24,073,232 112,693,780 25,799,444 22.89%
Less: Cost Allocation (4,248,469) (4,597,551) (26,079,640) (6,436,853) 24.68%
Net Joint Operating Requirements 15.304,307 19,475,681 86,614,140 19,362,591 22-36%
Less:Revenues (709,582) (666,483) (3,000,000) (956,281) 31.88%
Net Joint Operating Expenses $ 14,594,725 $ 18,809,198 $ 83,614,140 $ 18,406,310 22.01%
"'� Section 2-Page 3
2004-05 First Quarter Report
Summary of Expenses by Major Category
For the Three Months Ended September 30, 2004
sue+
Expense Expense Increase Increase Percent -
Budget Through Through (Decrease) (Decrease) Budget Remaining
Description 2004-05 9/30/04 9/30/03 $ %, Realized Budget ''^
i
Salary&Wages $49,954,650 $11,375,563 $ 9,998,919 $ 1,376,644 13.77% 22.77% $38,579,087
Employee Benefits 15,546,700 3,408,368 2,684,579 723,789 26.96% 21.92% 12,138,332 +
Administrative Expenses 1,290,560 341,664 318,161 23,503 7.39% 26.47% 948,896
Printing&Publication 404,690 66,691 101,775 (35,084) -34A7% 16.48% 337,999
Training&Meetings 1,002,760 156,743 206,790 (50,047) -24.20% 15.63% 846,017
Operating Expenses 13,893,270 3,311,202 3,223,101 88,101 2.73% 23.83% 10,582,068
Contractual Services 12,262,500 2,816,199 3,081,004 (264,805) -8.59% 22.97% 9,446,301
Professional Services 2,984,130 412,340 544,479 (132,139) -24.27% 13.82% 2,571,790
Research&Monitoring 1,223,900 292,814 416,074 (123,260) -29.62% 23.92% 931,086
Merl
Repairs&Maintenance 7,353,250 1,907,812 1,791,111 116.701 6.52% 25.95% 5,445,438
Utilities 5,476,950 1,511,295 1,368,199 143,096 10.46% 27.59% 3,965,655
Other Materials,Supplies,
and Services 1,300,420 198,753 339,040 (140,287) -41.38% 15.28% 1,101,667
prr
Net Cost Allocation (26,079,640) (6,436,853) (4,597,551) (1,839,302) 40.01% 24.68% (19,642,787)
Net J.O. Requirements 86,614,140 19,362,591 19,475,681 (113,090) -0.58% 22,36% 67,251,549
Revenues (3,000,000) (956,281) (666,483) (289,798) 43.48% 31.88% (2,043,719)
Net J.O. Expenses $83,614,140 $18,406,310 $18,809,198 $ (402,888) -2.14%u 22.01% $65,207,830
r�
Gallonage Flow(MG) 91,250.00 21,793.00 22,831.79 (1,038.79) -4.55% 1
Gallonage Flow(MGD) 250.00 236.88 248.17 (11.29) -4.55% pq
Gallonage Flow($'s/MG) $916.32 $844.60 $823.82 $20.78 2.52%
Pak
r�
r
Section 2 -Page 4 pow%
04
Joint Operating Budget Review
Summary of Joint Operating Revenues by Line Item
For the Three Months Ended September 30, 2004
Revenue Revenue Revenue Increase Increase
Budget Through Through Remaining Through (Decrease) (Decrease)
Description 2004-06 9130/04 9130/04 Budget 9/30103 $ %
Inter District Sewer Use $ 1,600,000 $ 527,700 32.98% $ 1,072,300 $ 400,833 $ 126,867 31.65%
Wastehauler 500,000 141,268 28.25% 358,732 46,490 94,778 203.87%
Sludge Disposal 620,000 174,300 28.11% 445,700 137,400 36,900 26.86%
CNG Sales 130,000 17,025 13.10% 112,975 55,489 (38,464) -69.32%
Other Sales - 42 N/A (42) 3,059 (3,017) -98.63%
Rents&Leases 25,000 5,397 21.59% 19,603 5,257 140 2.66%
.W General Non-Operating 50,000 40,145 80.29% 9,855 11,501 28,644 249.06%
Power Sales 75,000 50,404 67.21% 24,596 6,454 43,950 680.97%
Total $3,000,000 $ 956,281 31.88% $2,043,719 $ 666,483 $289,798 43.48%
ail
a�
a.►
,m Section 2-Page 5
2004-05 First Quarter Report
Summary of Expenses by Line Item
For the Three Months Ended September 30,2004
Expense %Expense Expense Increase Increase
Budget Through Through Remaining Through (Decrease) (Decrease)
Description 2004-05 9/30/04 9130/04 Budget 9/30/03 $ %
Salaries,Wages&Benefits_
Salaries&Wages $ 49,954,650 $ 11,375,563 22.77% $ 38,579,087 $ 9,998,919 $1,376,644 13.77%
Employee Benefits
Retirement 7,962,800 1,918,270 24.09% 6,044,530 1,142,003 776,267 67.97%
Group Insurances 6,699,900 1,274,691 19.03% 5,425,209 1,262,994 11,697 0.93%
Tuition&Certification Reimb 100,000 18,741 18.74% 81,259 10,739 8,002 74.51%.
Uniform Rental 72,200 16,556 22.93% 55,644 18,844 (2,288) -12.14% -
Workers'Compensation 700,000 175,000 25.00% 525,000 249,999 (74,999) -30.00%
Unemployment Insurance 11,800 5,110 43.31% 6,690 - 5,110 N/A 1"^
Total Benefits 15,546,700 3,408,368 21.920/6 12,138,332 2,684,579 723,789 26.96%
Salaries,Wages&Benefits 65,501,350 14,783,931 22.57% 50,717,419 12,693,498 2,100,433 16.560/6
Matl,Supply,&Services t`q
Administrative Expenses
Memberships 295,010 144,214 48.88% 150,796 172,185 (27,971) -16.24%
Office Exp-Supplies 151,250 26,650 17.62% 124,600 28,504 (1,854) -6.50%
Office Expense-Other 94,200 24,187 25.68% 70,013 18,784 5,403 28.76% t*
Small Computer Items 574,000 129,392 22.54% 444,608 49,919 79,473 159.200/6
Minor Furniture&Fixtures 176,100 17,221 9.78% 158,879 48,769 (31,548) -64.69%
Subtotal 1,290,560 341.664 26.47% 948,896 318,161 23,503 7.39%
Printing&Publication
Repro-In-House 297,700 47,120 15.83% 250,580 82,315 (35,195) -42.76%
Printing-Outside 61,350 12,724 20.74% 48,626 5,716 7,008 122.60%
Notices&Ads 39,750 6,343 15.96% 33,407 11,530 (5,187) -44.99%
Photo Processing 5,890 504 8.56% 5,386 2,214 (1,710) -77.24%
Subtotal 404,690 66,691 16.48% 337,999 101,775 (35,084) -34.47%
Training&Meetings
Meetings 287,460 44,723 15.56% 242,737 51,246 (6,523) -12.73% fat
Training 715,300 112,020 15.66% 603,280 155,544 (43,524) -27.98%
Subtotal 1,002,760 156,743 15.63% 846,017 206,790 (50,047) -24.200/6
Operating Expenses
Chemical Coagulants 4,935,200 1,038,862 21.05% 3,896,338 504,671 534,191 105.85% 1"1
Sulfide Control - - WA - 736,466 (736,466) -100.00%
Odor Control 1,549,000 333,430 21.53% 1.215,570 291,767 41,663 14.28%
Disinfection 5,737,500 1,546,982 26.96% 4,190,518 1,306,971 240,011 18.361/6
Chemicals-Misc&Cogen 44,000 2,321 5.28% 41,679 7,878 (5,557) -70.54%
Gasoline,Diesel&Oil 341,900 55,392 16.20% 286,508 66,166 (10,774) -16.28%
Tools 266,290 49,053 18.42% 217,237 35,970 13.083 36.37%
Safety equipment/tools 249,650 34,137 13.679/o 215,513 38,496 (4,359) -11.32% +„q
Solv,Paints&Jan.Supplies 67,380 22,250 33.02% 45,130 21,375 875 4.09%
Lab Chemicals&Supplies 506,250 189,617 37.46% 316,633 164,697 24,920 15.13%
Other Operating Supplies 172,100 33,120 19.24% 138.980 48,644 (15,524) -31.91%
Property Tax Fees 24,000 6,038 25.16% 17,962 - 6,038 N/A
Subtotal 13,893,270 3,311,202 23.83% 10.582,068 3,223,101 88,101 2.73%
Contractual Services
Solids Removal 9,686,000 2,314,694 23.90% 7,371,306 2,518,307 (203,613) -8.09%
Other Waste Disposal 617,000 139,440 22.600/a 477,560 156,685 (17,245) -11.01% A
Groundskeeping 270,000 35,532 13.16% 234,468 42,223 (6,691) -15.85%
Janitorial 350,000 80,355 22.96% 269,645 52,470 27,885 53.14%
Outside Lab Services 238,000 22,438 9.43% 215,562 18,002 4,436 24.64% r
Oxygen Plant Oper 342,000 81,294 23.77% 260,706 105,117 (23,823) -22.66%
Temporary Services 250,500 68,498 27.34% 182,002 107,910 (39.412) -36.520/6
Security Services 245,000 65,018 26.54% 179,982 49,362 15,656 31.72%
Other 264,000 8,930 3.38% 255,070 30,928 (21,998) -71.13% p,q
Subtotal 12,262,500 2,816,199 22.97% 9,446,301 3,081,004 (264,805) -8.59%
ontinued
Section 2- Page 6 r4
I
Joint Operating Budget Review
rA Summary of Expenses by Line Item
For the Three Months Ended September 30, 2004
AR Expense %Expense Expense Increase Increase
Budget Through Through Remaining Through (Decrease) (Decrease)
Description 2004-05 9/30104 9/30104 Budget 9/30103 $ %
Continued:
Professional Services
Legal 457,000 126,381 27.65% 330,619 137,539 (11,158) -8.11%
Audit&Accounting 109,700 37,304 34.01% 72,396 39,500 (2,196) -5.56%
Engineering 214,900 10,332 4.81% 204,568 53,334 (43,002) -80.63%
Enviro Scientific Consulting 260,000 8,000 3.08% 252,000 - 8,000 N/A
PeopleSoft Support 237,540 47,780 20.11% 189,760 105,560 (57,780) -54.74%
Software Prgm Consulting 140,000 21,164 15.12% 118.836 7,181 13,983 194.72%
«.. Advocacy Efforts 374,000 64,577 17.27% 309,423 72,012 (7,435) -10.32%
Industrial Hygiene Services 55,000 3,707 6.74% 51,293 - 3,707 N/A
Labor Negotiation Services 10,000 - 0.00% 10,000 13,063 (13,063) -100.00%
Other 1,125,990 93,095 8.27% 1,032,895 116,290 (23,195) -19.95%
Subtotal 2,984,130 412,340 13.82% 2,571,790 544,479 (132,139) -24.27%
Research&Monitoring
Environmental Monitoring 552,900 149,400 27.02% 403,500 235,785 (86,385) -36.64%
AR Air Quality Monitoring 145,000 12,949 8.93% 132,051 - 12,949 N/A
Research 526,000 130,465 24.80% 395,535 180,289 (49,824) -27.64%
Subtotal 1,223,900 292,814 23.92% 931,086 416,074 (123,260) -29.62%
Repairs&Maintenance
ON Materials&Services 5,776,550 1,599,841 27.70% 4,176,709 1,506,518 93,323 6.19%
Svc.Mtc.Agreements 1,576,700 307,971 19.53% 1,268,729 284,593 23,378 8.21%
Subtotal 7,353,250 1,907,812 25.95% 5,445,438 1,791,111 116,701 6.52%
Utilities
+� Telephone 220,600 31,627 14.34% 188,973 46,217 (14,590) -31.57%
Diesel For Generators 18,000 3,323 18.46% 14,677 6,592 (3,269) 49.59%
Natural Gas 1,922,100 618,246 32.17% 1,303,854 443,529 174,717 39.39%
Power 1,937,000 562,275 29.03% 1,374,725 618,661 (56,386) -9.11%
Water 1,379,250 295,824 21.45% 1,083,426 253,200 42,624 16.83%
Subtotal 5,476,950 1,511,295 27.59% 3,965,655 1,368,199 143,096 10.46%
Other Operating Supplies
OW* Outside Equip Rental 88,250 31,577 35.78% 56,673 17,607 13,970 79.34%
Insurance - - WA - 202,572 (202,572) -100.00%
Freight 98,000 22,382 22.84% 75,618 22,448 (66) -0.29%
Misc.Operating Expense 152,630 16,558 10.85% 136,072 19,587 (3,029) -15.46%
119� Regulatory Operating Fees 398,680 104,188 26.13% 294,492 71,188 33,000 46.36%
Subtotal 737,560 174,705 23.69% 562,855 333,402 (158,697) 47.60%
General Manager Contingency
&Reappropriations 224,810 - 0.00% 224,810 - - N/A
Other Non-Oper Expense 338,050 24,048 7,11% 314,002 5,638 18,410 326.53%
Total Materials,
4M Supplies&Services 47,192,430 11,015,513 23.34% 36,176,917 11,389,734 (374,221) -3.29%
Total Expenditures 112,693,780 25,799,444 22.89% 86,894,336 24,073,232 1,726,212 7.17%
Less:Cost Allocation (26.079,640) (6,436,853) 24.68% (19,642,787) (4,597,551) (1,839,302) 40.01%
Net Joint Operating
Requirements 86.614,140 19,362,591 22.36% 67,251.549 19,475,681 (113,090) -0.58%
Less: Revenues (3,000,000) (956.281) 31.88% (2,043,719) (666,483) (289,798) 43.48%
Net Joint Operating Expenses $ 83,614,140 $18,406,310 22.01% $ 65,207.830 $ 18,809,198 $ (402,888) -2.14%
Section 2 - Page 7
2004-05 First Quarter Report
Summary of Expenses by Treatment Process
For the Three Months Ended September 30,2004
1
Increase Increase
Actual Actual (Decrease) (Decrease)
9130104 9130103 $ %
Treatment Process:
Preliminary Treatment $ 1,402,479 $ 1,224,904 $ 177,575 14.50%
Primary Treatment 1,915,638 1,220,495 695,143 56.96%
Secondary Treatment 1,341,989 2,119,011 (777,022) -36.67%
Cryogenic Plant(Plant 2) 143,114 136,571 6,543 4.79%
Effluent Disposal 130,304 225,360 (95,056) -42.18%
Solids Handling 6,031,250 7,582,425 (1,551,175) -20.46%
I
Cogeneration 2,611,296 1,984,630 626,666 31.58%
Utilities 2,606,991 1,320,774 1,286,217 97.38%
Electrical Distribution 316,376 175,379 140,997 80.40%
1
Miscellaneous Buildings 882,960 1,616,044 (733,084) -45.36%
Air Quality 468,627 396,010 72,617 18.34%
/
Laboratory 1,511,567 1,474,078 37,489 2.54%
Net Joint Operating Requirements 19,362,591 19,475,681 (113.090) -0.58%
Less: Revenues (956,281) (666,483) (289,798) 43.48%
Net Joint Operating Expenses $ 18,406,310 $ 18,809,198 $ (402,888) -2.14%
roll
Section 2-Page 8 1 P"`
Joint Operating Budget Review
Staffing Trends
Full Time Equivalents
September 30, 2004
650 629
598
.r 600 51
5 567 26
.w 550 b
578
510
500
450 .
6/30/2001 6/30/2002 6/30/2003 6/30/2004 9/30/2004
■Actual ®Vacant
At September 30, 2004, the total head count was 588 employees, or a full time equivalency of 578.
Section 2 - Page 9
2004-05 First Quarter Report
M
I
1
1
J
This Page Intentionally Left Blank
r
r
1
r1
i
rr
,r
7
7
Section 2-Page 10 r
CIP Review
Capital Improvement Program
By Type and Funding Source
For the Three Months Ended September 30, 2004
Primary
Treatment Secondary
Headworks 6% Treatment
1 17%
Collections Facilities Odor Control Projects 2%
18%
Utility Systems 3%
_ Solids Handling&Digestion
19;
Plant Automation 1% Ocean Outfall Systems
Equipment 2% 9%
-- Prior Year Treatment Projects
2°%
Miscellaneous Support Projects
4%
Water Management
Projects
34%
Total Capital Improvement Expenditure- $46,071,285
Replacement/Rehabilitation,
515,568,501
34%
Improved Treatment,
Support, $19,423,959
42%
$1,069,800
2%
Additional Capacity,
$10,009,025
22%
Total Capital Improvement Expenditure - $46,O71,285
Section 3 - Page 1
2004-05 First Quarter Report
Summary of Capital Improvement Construction Requirements - Current Year I"
For the Three Months Ended September 30, 2004
2004-05 2004-05 2004-05
Cashflow Actual at Projected
Budget 9/30/04 Outlay
Collection System Improvement Projects
Collections
Greenville Sullivan/Raitt STreet Manhole Rehab $ - $ $
Santa Ana Trunk Sewer Rehab. 588,000 803 588,000
Lower Main-Broadway MH Rehabilitation -
Continuous Feed Chemical Treatment Facility 287.000 11,183 287,000
Carbon Cnyn Sewer and Pump Stn.Abandonment 55,000 21,290 55,000 -
Santa Ana River Interceptor Relief Sewer
Santa Ana River Interceptor Realignment and Prot. 238,000 15,833 238,000
Abandonment of the Existing SARI in SA River -
Abandonment of Yorba Linda Pump Station -
Taft Branch Improvements -
Atwood Subtrunk Improvements -
Lower Santa Ana River Interceptor Improvements -
Euclid Relief Improvements-Reach"A" -
Euclid Relief Improvements-Reach"B" -
Santa Ana River Relief Sewer,Reach B -
Newhope-Placentia&Cypress Trunk Replacements -
Upper&Lower Newhope-Placentia MH Rehabilitation -
SARI and South Anaheim Interceptor MH Rehabilitaiton - - P"+
Rehabilitate District Siphons by Adding Air Jumper 193,000 16.836 193,000
Newhope-Placentia Trunk Diversion 85.000 - 85,000
Green River Meter Station - -
Rehabilitation of the Magnolia Trunk Sewer
Trask Branch of the Hoover-Western Subtrunk - - -
Rehabilitation of the Westside Pump Station 425.000 14,094 425,000
Westside Relief Interceptor/Los Alamitos MH Rehab - - - y„R
Rehabilitaiton of the Seal Beach and Edinger PS 188,000 641 188,000
Miller-Holder Trunk Condition Assessment 250.000 321 250.000
Big Canyon Trunk Sewer Rehabilitation 1,515.000 27.767 1,515,000
Big Canyon Trunk Sewer Replacement 6,000 2,050 6,000 t�
Balboa Trunk Sewer Rehabilitaiton - - -
Replacement of the Bitter Point Pump Station 1,340,000 91.949 1,340.000
Replacement of the Rocky Point Pump Station 3,315,000 2,625,543 3,315.000
Rehabilitation of the 14th Street Pump Station 2,908,000 155,501 2,908.000
Rehabilitation of the"A"Street Pump Station 2,867,000 152.559 2.867.000
Rehabilitation of the Bay Bridge Pump Station 355,000 18.875 355.000
Rehabilitation of the Crystal Cove Pump Station 263,000 3,465 263.000 fi"I
Crystal Cove Pump Station Interior Rehabilitation 93.000 93,000
Bitter Point Force Main Rehabilitation 1,168,000 167,911 1,168,000
Newport Foce Main Consition Assessment 600,000 - 600,000
Abandonment of Airbase Trunk Sewers&College Ave 934.000 21,159 934,000
Abandonment of Airbase Trunk Sewer-California St 896.000 411,845 896,000
Sunflower Interceptor Manhole Rehab 371.000 66,066 371,000
Lemon Heights Subtrunk Street Rehabilitation 74,000 10,352 74,000
College Ave.Pump Station Parallel Force Main 838,000 40,793 838,000 I*
Gisler-Redhill Trunk Sewer Relocation-Phase 1 192,000 20.358 192,000
Gisler-Redhill Trunk Improvements,Reach A 4,826,000 99,127 4,826,000
Gisler-Redhill System Improvements,Reach B 489,000 14,660 489,000
Tustin Trunk Improvements 517.000 35,766 517,000
Orange Trunk Improvements 3,634,000 1,712.139 3.634.000
West Trunk Improvements 50,000 11,176 50,000
Gisler-Redhill/North Trunk Improvements 4,766.000 1,177,713 4.766.000
Rehabilitation of the College Ave Pump Station 577,000 8,840 577,000 1
(Continued)
Section 3 - Page 2 f
`w CIP Review
Summary of Capital Improvement Construction Requirements-Current Year
For the Three Months Ended September 30,2004
2004-05 2004-05 2004-05
Cashflow Actual at Projected
Budget 9/30/04 Outlay
Plant Automation&Computerization
SCADA Historian Replacement 456,000 456,000
Electronic Time Entry System 225,000 225,000
Power Monitoring and Control Systems 276,000 276,000
Fats,Oils,and Grease(FOG)Software 60,000 60,000
Enterprise Contract Management Solution 175,000 - 175,000
Document Management 68.000 10,298 68,000
Data Integration 156,000 108,306 156,000
Strategic Information Architecture(SIA) 25,000 - 25,000
InterneUlntranet Development 142,000 10,492 142,000
wry CMMS System Replacement 176,000 8,252 176.000
PDS213 Software Replacement 250,000 - 250,000
Environmental Compliance Awareness Program 330,000 - 330,000
Source Control Programming 404,000 72,019 404,000
Geographic Information System 325,000 87,236 325,000
Financial Information System Upgrade 440,000 59,687 440,000
Subtotal-Plant Automation&Computerization 3,508,000 356,290 3,508,000
Miscellaneous&Support Projects
Facilities Engineering Projects-Joint 1,132,000 24,945 1,132,000
Facilities Engineering Projects-Plant 1 1,122,000 271,776 1,122,000
Facilities Engineering Projects-Plant 2 1,118,000 14,720 1,118,000
Area Classification Study Implementation Plan 4,264,000 856.985 4,264,000
Supplemental Full Secondary Treatment CEQA Doc 385,000 - 385,000
Supplement No.1 to the 1999 Strategic Plan EIR 309,000 64,737 309,000
Long Range Biosolids Management Plan 350,000 94,544 350,000
Modifications to Existing Mech Systems - - -
Building Rehabilitation/Refurbishment - - -
Space Allocation and Interior Renovation 511,000 20,798 511,000
Laboratory Rehabilitation 321,000 30,872 321,000
Tenant Improvements to Rebuild Shop 252,000 72,752 252,000
Laboratory Refurbishment at Plant No.1 - - -
Regional FOG Control Collection at Plant No.1 - - -
Small Cap.Equip.Replacement Project 500,000 20,664 500,000
"~ Asset Management Program 1,210,000 100,849 1,210,000
Warehouse Reinvention Project 120,000 38,842 120,000
Plant 2 Maintenance Building Modifications 20,000 442 20,000
Subtotal-Miscellaneous&Support Projects 11,614,000 1,612,826 11,614.000
Water Management Projects
Groundwater Replenishment System 48,024,000 15,928,560 48,024,000
Water Conservation 600,000 759 600,000
Long Term Permanent Monitoring Program 713,000 201,704 713,000
Subtotal-Water Management Projects 49,337,000 16,131,023 49,337,000
Strategic&Master Planning
Collection System Model and Strategic Plan Update 300,000 2,822 300,000
Treatment Plant Strategic Plan Update 330,000 5,177 330,000
Orange County Biosolids Production Siting Study 250,000 250,000
Subtotal-Strategic&Master Planning 880.000 7,999 880,000
Additional Charges to CIP Completed at 6130/04 - 742,354 742,400
Total Treatment and Disposal Projects 166,013,000 36,745,804 166,755,400
Capital Equipment Purchases 3,152,600 724,041 3,152,600
Total Collections and Treatment&Disposal
Projects and Capital Equipment Purchases $231,223,600 $46,071,285 $232,069,500
Section 3-Page 5
ea
i
2004-05 First Quarter Report
Summary of Capital Improvement Construction Requirements-Project Life
For the Three Months Ended September 30,2004
Current Total -
Approved June 30,2004 Year Projected Remaining
Project Accumulated Projected Cost at Future
Budget Cost Cost June 30,2005 Budget
Collection System Improvement Prolects
Colloctions
Greenville Sullivan/Raiff STreet Manhole Rehab $ 3.269,000 $ - $ - $ - $ 3,269,000
Santa Ana Trunk Sewer Rehab. 14,638,000 403,838 588,000 991,838 13,646,162
Lower Main-Broadway MH Rehabilitation 1,467,000 - - - 1,467,000
Continuous Feed Chemical Treatment Facility 861,000 120,764 287,000 407,764 453,236
Carbon Cnyn Sewer and Pump Sin.Abandonment 3,970,000 516,344 55,000 571,344 3.398,656
Santa Ana River Interceptor Relief Sewer 17,272,000 - - - 17,272,000
Santa Ana River Interceptor Realignment and Prot. 9,583,000 2,092,082 238,000 2,330,082 7,252,918
Abandonment of the Existing SARI in SA River 8,456,000 151 - 151 8,455,849
Abandonment of Yorba Linda Pump Station 955,000 - - - 955,000
Taft Branch Improvements 3,508,000 9,386 - 9,386 3,498,614
Atwood Subtrunk Improvements 3,187,000 110,352 - 110,352 3,076,648
Lower Santa Ana River Interceptor Improvements 35,012,000 - - 35,012,000
Euclid Relief Improvements-Reach"A" 20,856,000 13,510 - 13,510 20,842,490
Euclid Relief Improvements-Reach"B" 10,319,000 - - - 10,319,000
Santa Ana River Relief Sewer,Reach B 32,702,000 - - - 32.702,000
Newhope-Placentia&Cypress Trunk Replacements 28,785,000 - - - 28,785,000
Upper&Lower Newhope-Placentia MH Rehabilitation 4,351,000 - - - 4,351,000
SARI and South Anaheim Interceptor MH Rehabilitaiton 3,087,000 - - - 3,087,000
Rehabilitate District Siphons by Adding Air Jumper 5,731,000 - 193,000 193,000 5,538,000
Newhope-Placentia Trunk Diversion 2,746,000 - 85,000 85,000 2,661,000
Green River Meter Station 704,000 - - - 704.000
Rehabilitation of the Magnolia Trunk Sewer 48,868,000 - - 48,868,000
Trask Branch of the Hoover-Westem Subtrunk 1,410,000 - - - 1,410,000
Rehabilitation of the Westside Pump Station 3,500,000 393,316 425,000 818,316 2,681,684
Westside Relief Interceptor/Los Alamitos MH Rehab 17.136,000 - - - 17.136,000
Rehabilitaiton of the Seal Beach and Edinger PS 8,574,000 - 188,000 188,000 8,386,000
Miller-Holder Trunk Condition Assessment 250,000 - 250,000 250,000 -
Big Canyon Trunk Sewer Rehabilitation 1,973,000 291,583 1,515,000 1.806,583 166,417
Big Canyon Trunk Sewer Replacement 922,000 - 6,000 6,000 916,000
Balboa Trunk Sewer Rehabilitaiton 5.759,000 - - - 5,759,000
Replacement of the Bitter Point Pump Station 8,159,000 639.839 1,340,000 1,979,839 6,179,161
Replacement of the Rocky Point Pump Station 9,511.000 503,396 3,315,000 3,818,396 5,692,604
Rehabilitation of the 14th Street Pump Station 6,422,000 1,175,839 2,908,000 4,083,839 2,338,161
Rehabilitation of the"A"Street Pump Station 6,609,000 1,843.242 2,867,000 4,710,242 1,898.758
Rehabilitation of the Bay Bridge Pump Station 2,612,000 160,708 355,000 515,708 2,095,292
Rehabilitation of the Crystal Cove Pump Station 549,000 429,813 263,000 692,813 (143,813) T
Crystal Cove Pump Station Interior Rehabilitation 963,000 - 93,000 93,000 870,000
Bitter Point Force Main Rehabilitation 20,935,000 683,309 1,168,000 1,851,309 19,083,691
Newport Foce Main Consition Assessment 600,000 - 600,000 600,000 -
Abandonment of Airbase Trunk Sewers&College Ave 1,768,000 - 934,000 934,000 834,000
Abandonment of Airbase Trunk Sewer-Califomia St 1,125,000 134.479 896,000 1,030,479 94,521
Sunflower Interceptor Manhole Rehab 3,782,000 649,901 371,000 1,020,901 2,761,099
Lemon Heights Subtrunk Street Rehabilitation 1,043,000 34,999 74,000 108,999 934,001 _
College Ave.Pump Station Parallel Force Main 1,734,000 - 838,000 838.000 896,000
Gisler-Redhill Trunk Sewer Relocation-Phase 1 936.000 19.500 192,000 211,500 724,500 (
Gisler-Redhill Trunk Improvements,Reach A 7,066,000 - 4,826,000 4,826,000 2,240,000
Gisler-Redhill System Improvements,Reach B 6,893,000 462,597 489,000 951,597 5,941,403
Tustin Trunk Improvements 5,004,000 - 517,000 517,000 4,487,000
Orange Trunk Improvements 5,298,000 3,634,000 3,634,000 1,664,000
West Trunk Improvements 452,000 50,000 50,000 402,000
Gisler-Redhill/North Trunk Improvements 15.359,000 - 4.766,000 4,766,000 10,593,000
Rehabilitation of the College Ave Pump Station 6,321,000 148,183 577,000 725,183 5,595,817
(Continued)
Section 3-Page 6
1 �
CIP Review
Summary of Capital Improvement Construction Requirements-Project Life
+.+ For the Three Months Ended September 30, 2004
Current Total
Approved June 30,2004 Year Projected Remaining
�+ Project Accumulated Projected Cost at Future
Budget Cost Cost June 30,2005 Budget
(Collections continued)
Rehabilitaiton of the MacArthur Pump Station 2,914,000 187.412 322,000 509,412 2.404,588
Lower Gisler-Redhill Trunk Relocation and MH Rehab 6,615,000 - - - 6,615,000
Upper Gisler-Redhill MH Rehabilitaiton&Campus Dr 2,121,000 - - 2,121,000
Warner Avenue Relief Sewer 7,480,000 6,699,017 1,411,000 8,110,017 (630,017)
✓ Edinger/Bosla Chica Trunk Improvements 2,126,000 - - - 2,126,000
Coast Trunk Sewer Rehabilitaiton 16,635,000 90,809 160,000 250,809 16,384,191
Warner Sewer Siphon 1,179.000 - 39,000 39,000 1,140,000
OCTA Sewer Relocation Projects 300,000 - 100.000 100,000 200,000
two North County Collections Support Facility Study 50,000 - 50,000 50,000 -
Permanent Odor Control Facilities 3,848,000 - - - 3,848,000
Facilities Engineering Projects-Collections 5,400,000 - 306,000 306,000 5,094,000
Replacement of the Ellis Ave.Pump Station 34,337,000 1,419,483 3,296,000 4,715,483 29,621.517
�+ Bushard Trunk Sewer Rehabilitation 40,793,000 18,624,053 21.291,000 39,915.053 877,947
Pump Station P&IDs and Equipment Tagging 720,000 - 180,000 180,000 540,000
Additional Charges to CIP Closed at 6/30/04 10,918,348 8,547,100 101,600 8,648,700 2,269.648
Subtotal-Collections 548,428,348 46,405,005 62.159,600 108,564,605 439,863.743
r�
Revenue Area 14
Additional Charges to CIP Closed at 6/30/04 - 175,164 1,900 177,064 (177.064)
Subtotal-Revenue Area 14 - 175.164 1,900 177,064 (177,064)
urn Total Collection System Improvement Projects 548,428,348 46,580,169 62,161.500 108,741,669 439,686,679
Treatment&Disposal Projects
Headworks
r.a PLC Programming and Integration 209,000 107.159 120,000 227,159 (18,159)
Headworks Rehabilitation and Expansion at Plant No.1 25,002,000 - - - 25,002,000
Headworks Rehabilitation/Refurbishment 20,758,000 70.922 82,000 152,922 20,605,078
Headworks Improvements at Plant No.2 229,241,000 16,501,804 1,852,000 18.353.804 210,887,196
vra Subtotal-Headworks 275,210,000 16,679,885 2,054,000 18,733,885 256,476,115
Primary Treatment
Pri.Clarifiers 16-31 &Related Facilities 88,561,000 68,789,546 13,339,000 82,128,546 6,432,454
Primary Treatment Rehab/Refurb 55,093,000 651,528 3,504.000 4,155,528 50,937,472
Sludge Density Meter Upgrades 800,000 23,227 390,000 413,227 386,773
Subtotal-Primary Treatment 144,454,000 69,464,301 17,233,000 86,697,301 57,756,699
Secondary Treatment
New Secondary Treatment System at Plant No. 1 242,543,000 1,569,307 8,751,000 10,320,307 232,222,693
Trickling Filter Rehabilitation and New Clarifiers 46,210,000 17,745.002 18,215,000 35.960,002 10,249,998
Activated Sludge Plant Rehabilitation 44,569.000 1,608,126 2,840,000 4,448,126 40,120,874
Sec Treat Monitoring&Cntrl Sys Upgrad 8,703,000 3.102.273 4,555,000 7,657,273 1,045,727
Rehabilitation of Activated Sludge Plant at Plant 2 20,474,000 896.461 2,318.000 3,214,461 17,259,539
Trickling Filters at Plant No.2 138.487,000 486,676 2,387,000 2,873,676 135,613,324
e.e Oxygen Plant Assessment 507,000 141,335 360,000 501,335 5,665
Oxygen Plant Rehabilitation 2,300,000 - - - 2,300,000
Activated Sludge Aeration Basin Selector Study 775,000 602,930 95,000 697,930 77,070
Computer Modeling of Activated Sludge System 110,000 1135 56,000 56,135 53,865
Subtotal-Secondary Treatment 504,678.000 26,152 245 39,577,000 65,729,245 438.948,755
Solids Handling&Digestion
Sludge Digester Rehabilitation at Plant 1 31,928.000 174,059 829,000 1,003,059 30.924,941
Sludge Dewatering and Odor control at Plant 1 109,518,000 198,395 1,481,000 1,679.395 107,838,605
Truck Wash and Dewatering Beds at Plant No.1 2,131,000 - 56,000 56,000 2.075,000
(Continued)
Section 3-Page 7
2004-05 First Quarter Report
Summary of Capital Improvement Construction Requirements-Project Life
For the Three Months Ended September 30, 2004
Current Total
i
Approved June 30,2004 Year Projected Remaining
Project Accumulated Projected Cost at Future
Budget Cost Cost June 30,2005 Budget
(Solids Handling&Digestion continued)
Solids Storage and Truck Loading Facility 14.950,000 14,015,201 482,000 14,497,201 452,799
Rehabilitation of Solids Storage Silos A&B at P2 9,100,000 - 106,000 106,000 8.994,000
Digester Rehabilitation at Plant 2 25,621,000 123.856 445,000 568,856 25,052,144 _
Sludge Dewatering and Odor Control at Plant 2 38,922,000 - - - 38,922,000
Dewatering Beds at Plant No.2 Siting Study 50,000 - 50,000 50,000 -
Digester Gas Venting Study 100,000 - 100,000 100,000 -
High Rate Digester Mix Pumps Mech.Seals 517,000 542,970 43,000 585,970 (68,970) -
Tule Ranch Biosolids Management Needs 780,000 258,468 297,000 555,468 224,532
Subtotal-Solids Handling&Digestion 233,617,000 15,312,949 3,889,000 19,201,949 214,415,051
Ocean Outfall Systems _
Peak Flow Management 3,393,000 1,755,253 1,501.000 3,256,253 136,747
Effluent Pumping Station Annex 61,338,000 11.876,647 17,264,000 29,140,647 32,197,353
Short Term Outfall Bacteria Reduction 8,067,000 8,114,412 52,000 8,166,412 (99,412)
COBS Rehabilitation Assessment Study 200,000 - 200,000 200,000 -
NPDES Permit Renewal 214,000 1,150,657 100,000 1,250,657 (1,036,657)
Subtotal-Ocean Outfall Systems 73.212,000 22,896,969 19,117,000 42,013,969 31,198,031
Utility Systems
Arc Flash Hazard Evaluation 160,000 - 160,000 160,000 -
Underground Storage Tank Rehabilitation 1.390,000 - 150,000 150,000 1,240,000
Interplant Gas Line Rehabilitation 2,887,000 - 380,000 380,000 2,507,000
Standby Power and Reliability Modifications 17,643,000 14.502,998 2,035,000 16,537.998 1,105,002
Cable Tray Improvements at Plants 1 &2 29,526,000 1,150,865 263,000 1,413,865 28,112,135
Central Generation Air Quality Upgrades 5,440,000 1,471,985 1,447,000 2,918,985 2,521,015 lrJ
Central Generation Automation 2,597,000 - 48,000 48,000 2,549,000
Fire Supression for Servers and Equipment at P1 &P2 686,000 - 601.000 601,000 85,000
Electrical Power Distribution System Improvements 7.600,000 - 340,000 340,000 7,260,000
Plant 1 66kV Substation 4,486,000 77 31,000 31,077 4.454,923 ta+
Gas Compressor Addition at Plant No.2 4,326,000 714,559 453,000 1,167,559 3,158,441
Utilities Rehabilitation and Refurbishment 5,175,000 2,008,484 3,636,000 5,644,484 (469,484)
Electrical Equipment Refurbishment and Protection 3,091,000 79,553 2,436,000 2,515,553 575,447
Indoor/Outdoor Lighting Study 132,000 33,820 115,000 148,820 (16,820)
Plant 1 Plant Water VFD Replacement 2,224,000 17,531 1,056,000 1,073,531 1,150,469
Subtotal-Utility Systems 87,363,000 19,979,872 13.151,000 33,130,872 54,232.128 -
Odor Control Related Projects W
Facilities Modifications for Odor Control 3,645,000 2,642,717 1.270,000 3,912.717 (267,717)
Rehabilitation of Odor Control Facilities 33,224,000 1,632,138 2.925,000 4,557.138 28,666.862
Biological Scrubbers Souce Water Control Study 150,000 - 150,000 150,000 -
Subtotal-Odor Control Related Projects 37,019,000 4,274,855 4,345.000 8,619.855 28,399,145
Process Related Special Projects
Diesel Exhaust Emissions Controls Options Study 250,000 - 100,000 100,000 150,000 �
Digester Gas Siloxane Removal Study 100,000 100,000 100,000 -
Brine Management Study 200,000 - 100,000 100,000 100,000
Plant O&M Manual and SOP Project-Phase 1 4,000,000 467,343 70.000 537,343 3,462,657
Hazardous Energy Control Procedures 1,190,000 911,617 220.000 1,131,617 58.383
Corrosion Management 7,548,000 263,818 130,000 393,818 7,154,182
Special Projects: Anoxic Gas Flotation(AGF) 798,000 585,321 208,000 793,321 4,679
Special Projects: Anaerobic Baffled Reactor(ABR) 195.000 122,320 100,000 222,320 (27,320)
Special Projects: Biotrickling Filter(BTF) 770.000 532,054 280,000 812,054 (42,054)
Subtotal-Process Related Special Projects 15,051,000 2,882,473 1,308,000 4,190,473 10,860,527
(Continued) l.J
Section 3- Page 8
CIP Review
Summary of Capital Improvement Construction Requirements-Project Life
a+ For the Three Months Ended September 30, 2004
Current Total
Approved June 30,2004 Year Projected Remaining
"W Project Accumulated Projected Cost at Future
Plant Automation 8 Computerization Budget Cost Cost June 30,2005 Budget
SCADA Historian Replacement 456,000 456,000 456,000 -
,�, Electronic Time Entry System 250,000 - 225,000 225,000 25,000
Power Monitoring and Control Systems 3,478,000 24,402 276,000 300,402 3,177,598
Fats,Oils,and Grease(FOG)Software 100,000 - 60,000 60,000 40,000
Enterprise Contract Management Solution 1.175,000 - 175,000 175,000 1,000,000
,.d Document Management 864,000 907,383 68,000 975,383 (111,383)
Data Integration 4,334,000 3,764,536 156,000 3,920,536 413,464
Strategic Information Architecture(SIA) 724,000 440,665 25,000 465,665 258,335
Intemet/Intranet Development 650,000 350.517 142,000 492,517 157,483
air CMMS System Replacement 3,789,000 4,557 176,000 180,557 3,608,443
PDS2D Software Replacement 250,000 - 250,000 250,000 -
Environmental Compliance Awareness Program 330,000 - 330,000 330,000
Source Control Programming 2,956,000 1,761,412 404,000 2,165,412 790,588
�++ Geographic Information System 4,157,000 686,343 325,000 1,011,343 3.145,657
Financial Information System Upgrade 3,223,000 2,322,798 440,000 2,762,798 460,202
Subtotal-Plant Automation&Computerization 26,736,000 10,262,613 3,508.000 13,770,613 12,965,387
Miscellaneous&Support Projects
Facilities Engineering Projects-Joint 18,200,000 144,408 1,132,000 1,276,408 16,923,592
Facilities Engineering Projects-Plant 1 18,200,000 414,625 1,122,000 1,536,625 16,663,375
Facilities Engineering Projects-Plant 2 18,200,000 362,316 1,118.000 1,480,316 16,719,684
>� Area Classification Study Implementation Plan 25,283,000 20,481,680 4,264,000 24,745,680 537,320
Supplemental Full Secondary Treatment CEQA Doc 475,000 - 385,000 385,000 90,000
Supplement No.1 to the 1999 Strategic Plan EIR 832,000 644,337 309,000 953,337 (121,337)
Long Range Biosolids Management Plan 1,561,000 1,343,630 350,000 1,693.630 (132,630)
a. Modifications to Existing Mech Systems 3,007,000 272,215 - 272,215 2,734,785
Building Rehabilitation/Refurbishment 1,455,000 169 - 169 1,454,831
Space Allocation and Interior Renovation 17.888,000 923,070 511,000 1,434,070 16,453,930
Laboratory Rehabilitation 1,829,000 86,179 321,000 407,179 1,421,821
WW Tenant Improvements to Rebuild Shop 321,000 68,142 252,000 320,142 858
Laboratory Refurbishment at Plant No.1 6,261,000 - - - 6,261,000
Regional FOG Control Collection at Plant No.1 2,666,000 - - - 2,666,000
Small Cap.Equip.Replacement Project 3,000,000 2,192,538 500,000 2,692,538 307,462
�+ Asset Management Program 13,055,000 18,381 1,210,000 1,228,381 11,826,619
Warehouse Reinvention Project 600,000 130,969 120,000 250,969 349,031
Plant 2 Maintenance Building Modifications 340,000 1,926 20,000 21,926 318.074
Subtotal-Miscellaneous&Support Projects 133,173,000 27,084.585 11,614,000 38,698,585 94,474,415
Water Management Projects
Groundwater Replenishment System 251,660,000 31,756,456 48,024.000 79,780,456 171,879,544
Water Conservation 3,900,000 3,563,823 600.000 4,163,823 (263,823)
�t Long Tenn Permanent Monitoring Program 7.074,000 5,294,528 713,000 6,007,528 1,066,472
Subtotal-Water Management Projects 262,634,000 40,614,807 49,337,000 89,951,807 172,682,193
Strategic&Master Planning
Collection System Model and Strategic Plan Update 500,000 - 300,000 300,000 200,000
Treatment Plant Strategic Plan Update 3,620,000 - 330,000 330,000 3,290,000
Orange County Biosolids Production Siting Study 250,000 - 250,000 250,000 -
Subtotal-Strategic&Master Planning 4,370,000 - 880,000 880,000 3,490,000
rri
Additional Charges to CIP Completed at 6130104 37,850,768 92,965,665 742,400 93,708,065 (55,857,297)
Total Treatment and Disposal Projects 1,835,367,768 348,571,219 166,755,400 515,326,619 1,320,041.149
,o, Capital Equipment Purchases 57,152,600 3,152.600 3,152,600 54,000,000
Total Collections and Treatment&Disposal
Projects and Capital Equipment Purchases $2,440,948,716 $395,151,388 $232,069,500 $627,220,888 $1,813,727,828
rr '
Section 3-Page 9
r
i
2004-05 First Quarter Report I
V
i
This Page Intentionally Left Blank ,
s �
6w
Section 3-Page 10
Budget Review by Revenue Area
All Revenue Areas Operating and Capital Facilities Budget Review
For the Three Months Ended September 30, 2004
m
Operating Budget Review
2004-05 Year-To- Remaining Year-To-Date
Budget Date Budget %of Budget
CASH RECEIPTS:
Tax Allocations/Subventions (Share of 1%) $ 28,161,000 $ 3,212,279 $ 24,948,721 11.41%
Other User Fees 110,928,000 4,481,120 106,446,880 4.04%
woo Capital Facilities Capacity Charges 11,560,000 753,148 10,806,852 6.52%
Sale of Capacity Rights 2,600,000 - 2,600,000 0.00%
Capital Assessment(IRWD) 8,400,000 4,451,677 3,948,323 53.00%
Interest& Miscellaneous Revenue 32,183,520 6,807,748 25,375,772 21.15%
rr
Total Receipts $ 193,832,520 $19,705,972 $174,126,548 10.17%
CASH DISBURSEMENTS:
`d Revenue Area Programs:
Collection System $ 12,061,200 $ 3.274,158 $ 8,787,042 27.15%
Odor Control Program 5,839,480 246,227 5,593,253 4.22%
Now Fats, Oil, & Grease Program 187,370 210,701 (23,331) 112.45%
Urban Runoff Program 442,510 44,320 398,190 10.02%
Cooperative Projects Grant Program 4,075,230 24,253 4,050,977 0,60%
Revenue Area Programs Subtotal 22,605,790 3,799,659 18,806,131 16.81%
Share of Joint Works Capital Improvements 169,165,600 37,469,845 131,695,755 22.15%
Collection Activity Capital Improvements 62,058,000 8,601,440 53,456,560 13.86%
Share of Joint Works Operating Expenses 83,614,140 18,406,310 65,207,830 22.01%
COP Retirement and Interest Expense 41,917,000 18,238,645 23,678,355 43.51%
Total Disbursements $ 379,360,530 $86,515,899 $292,844,631 22.81%
Capital Facilities Budget Review
Balance Adjustments Transfer to Balance
07/01/04 &Additions Fixed Assets 9/30/04
CONSTRUCTION IN PROGRESS:
Share of Joint Works Treatment Plant CIP $ 324.089,013 $37,469,845 $ - $ 361,558,858
Collection Activity Construction in Progress 35,014,857 8,601,440 - 43,616,297
Subtotal 359,103,870 46,071,285 - 405,175,155
PROPERTY, PLANT& EQUIPMENT(at cost):
Land and Property Rights 11,446,087 - - 11,446,087
Collection Lines and Pump Stations 425,430,380 - - 425,430,380
,.r
Treatment Facilities 657,941,648 - - 657,941,648
Disposal Facilities 90,161,860 - - 90,161,860
General Plant and Administrative Facilities 125,801,901 - - 125,801,901
bow
Subtotal 1,310,781,876 - - 1,310,781,876
Total Property, Plant& Equipment& CIP $1,669,885,746 $46,071,285 $ - $1.715,957,031
rr
Section 4- Page 1
1
FY 2004-05 First Quarter Report L
t
Consolidated Revenue Area Operating and Capital Facilities Budget Review j,,,
For the Three Months Ended September 30, 2004
Operating Budget Review
2004-05 Year-To- Remaining Year-to-Date
Budget Date Budget %of Budget
CASH RECEIPTS:
Tax Allocations/Subventions (Share of 1%) $ 27,436,000 $ 3,147,870 $ 24,288,130 11.47%
Other User Fees 106,728,000 3,209,503 103,518,497 3.01%
Capital Facilities Capacity Charges 11,560,000 753,148 10,806,852 6.52% 6d
Sale of Capacity Rights 2,470,520 - 2,470,520 -
Capital Assessment(IRWD) - - - -
Interest&Miscellaneous Revenue 27,713,000 6,807,344 20,905,656 24.56%
Total Receipts $ 175,907,520 $13,917,865 $161,989,655 7.91%
CASH DISBURSEMENTS:
Revenue Area Programs:
Collection System $ 11,730,430 $ 3,205,925 $ 8,524,505 27.33%
Odor Control Program 5,545,750 246,227 5,299,523 4.44%
Fats, Oil, &Grease Program 177,950 195,696 (17,746) 109.97%
Urban Runoff Program 420,250 42,090 378,160 10.02%
Cooperative Projects Grant Program 4,075,230 24,253 4,050,977 0.60%
Revenue Area Programs Subtotal 21,949,610 3,714,191 18,235,419 16.92%
Share of Joint Works Capital Improvements 160,741,200 1,877,239 158,863,961 1.17%
Collection Activity Capital Improvements 62,058,000 8,599,551 53,458,449 13.86%
Share of Joint Works Operating Expenses 79,408,350 17,447,882 61,960,468 21.97% 6.0
COP Retirement and Interest Expense 41,917,000 18,238,645 23,678,355 43.51%
Total Disbursements $ 366,074,160 $49,877,508 $316,196,652 13.62%
6W
Capital Facilities Budget Review
Balance Adjustments Transfer to Balance �d
07/01/04 &Additions Fixed Assets 9/30/04
CONSTRUCTION IN PROGRESS:
Share of Joint Works Treatment Plant CIP $ 307,852,153 $ 1,877,239 $ - $ 309,729,392
I.d
Collection Activity Construction in Progress 34,948,987 8,599,551 - 43,548,538
Subtotal 342,801,140 10,476,790 - 353,277,930
W
PROPERTY, PLANT&EQUIPMENT(at cost):
Land and Property Rights 10,876,019 - - 10,876,019
Collection Lines and Pump Stations 394,649,280 - - 394,649,280
Treatment Facilities 624,979,770 - - 624,979,770
Disposal Facilities 85,649,838 - - 85,649,838
General Plant and Administrative Facilities 119,534,931 - - 119,534,931
�..�
Subtotal 1,235,689,838 - - 1,235,689,838
Total Property, Plant& Equipment& CIP $1,578,490,978 $10,476,790 $ - $1,588,967,768
Section 4- Page 2
W
Vvi Budget Review by Revenue Area
Revenue Area No. 14 Operating and Capital Facilities Budget Review
For the Three Months Ended September 30, 2004
Operating Budget Review
r
2004-05 Year-To- Remaining Year-To-Date
Budget Date Budget %of Budget
CASH RECEIPTS:
�+ Tax Allocations/Subventions(Share of 1%) $ 725,000 $ 64,409 $ 660,591 8.88%
Other User Fees 4,200,000 1,271,617 2,928,383 30.28%
Capital Facilities Capacity Charges - - - N/A
Sale of Capacity Rights 129,480 - 129,480 0.00%
Capital Assessment(IRWD) 8,400,000 4.451,677 3,948,323 53.00%
Interest&Miscellaneous Revenue 4,470,520 404 4,470,116 0.01%
+� Total Receipts $ 17,925.000 $ 5,788,107 $ 12,136,893 32.29%
CASH DISBURSEMENTS:
Revenue Area Programs:
Collection System $ 330,770 $ 68,233 $ 262,537 20.63%
Odor Control Program 293,730 - 293,730 0.00%
wow Fats,Oil, &Grease Program 9,420 15,005 (5,585) 159.29%
Urban Runoff Program 22,260 2,230 20,030 10.02%
Cooperative Projects Grant Program - - - N/A
Revenue Area Programs Subtotal 656,180 85,468 570,712 13.03%
MW Share of Joint Works Capital Improvements 8,424,400 35,592,606 (27,168,206) 422.49%
Collection Activity Capital Improvements - 1,889 (1,889) N/A
Share of Joint Works Operating Expenses 4,205,790 958,428 3,247,362 22.79%
tErl COP Retirement and Interest Expense - - - N/A
Total Disbursements $ 13,286,370 $36,638,391 $(23,352,021) 275.76%
u.0
Capital Facilities Budget Review
Balance Adjustments Transfer to Balance
07/01/04 &Additions Fixed Assets 9130/04
CONSTRUCTION IN PROGRESS:
Share of Joint Works Treatment Plant CIP $ 16,236,860 $35,592,606 $ - $ 51,829,466
..r Collection Activity Construction in Progress 65,870 1,889 - 67,759
Subtotal 16,302,730 35,594,495 - 51,897,225
+.d PROPERTY, PLANT&EQUIPMENT(at cost):
Land and Property Rights 570,068 - - 570,068
Collection Lines and Pump Stations 30,781,100 - - 30,781,100
low Treatment Facilities 32,961,878 - - 32,961.878
Disposal Facilities 4,512,022 - - 4,512,022
General Plant and Administrative Facilities 6,266,970 - - 6,266,970
b.r Subtotal 75,092.038 - - 75,092,038
Total Property, Plant& Equipment&CIP $ 91,394.768 $35,594,495 $ - $ 126,989,263
No
bow
Section 4-Page 3
No
I
FY 2004-05 First Quarter Report
This Page Intentionally Left Blank
w
Section 4- Page 4
Self Insurance Review
General Liability and Property Fund Budget Review
VW For the Three Months Ended September 30,2004
Percent
Actual of Budget Remaining Actual
2004-05 Through Through 2004-05 Through Increase
two Budget 9/30104 9/30104 Budget 9130103 (Decrease)
Revenues:
MW In-Lieu Premiums $ 1,100,000 $ 275,001 25.00% $ 824.999 $675,000 $ (399,999)
Interest&Miscellaneous 20,000 - 0.00% 20,000 191 (191)
tow Service Department Allocation - 522 N/A (522) (354,498) 355,020
Allocation from Other Funds 14,100 - 0.00% 14,100 1,456 (1,456)
Total Revenues 1,134,100 275,523 24.29% 858,577 322,149 (46,626)
tow Expenses:
Benefits/Claims 300,000 1.303 0.43% 298.697 65,548 (64,245)
Contractual Services 1,000 300 30.00% 700 300 -
Legal Services 325,000 104,695 32.21% 220,305 34,611 70,084
Professional Services 5,000 299 5.98% 4,701 - 299
Subtotal 631,000 106,597 16.89% 524,403 100,459 6,138
Insurance premium 510,000 290,579 56.98% 219,421 97,053 193,526
Total Expenses 1,141,000 397,176 34.81% 743,824 197,512 199,664
taw
Excess Revenue(Expenses) (6,900) (121,653) 1763.09% $ 114,753 124,637 (246,290)
Beginning Reserves 554,200 55,000,000 94,372 54,905,628
kow
Ending Reserves $ 547,300 $54,878,347 $219,009 $54,659,338
UW
bw
Section 5-Page 1
No
i
FY 2004-05 First Quarter Report L
Workers'Compensation Fund Budget Review L
For the Three Months Ended September 30,2004
L
Percent
Actual of Budget Remaining Actual
2004-05 Through Through 2004-05 Through Increase
Budget 9130/04 9/30/04 Budget 9/30/03 (Decrease)
Revenues:
In-Lieu Premiums $ 700,000 $ 175,000 25.00% $ 525,000 $250,000 $ (75,000)
Interest& Miscellaneous 12,000 - 12,000 36 (36)
Service Department Allocations 500 129 25.80% 371 (3,912) 4,041
Total Revenues 712,500_ 175,129 24.58% 537,371 246,124 (70,996) ,
Iw
Expenses:
Benefits/Claims 400,000 38,577 9.64% 361,423 62,209 (23,632)
Contractual Services 25,000 15,125 60.50% 9,875 6,250 8,875
Legal Services 25,000 4,700 18.80% 20,300 2,149 2,551
Professional Services 25,000 2,710 10.84% 22,290 3,350 (640)
6.i
Subtotal 475,000 61,112 12.87% 413,888 73,958 (12,846)
Insurance premium 260,000 52,096 20.04% 207,904 40,171 11,925
Total Expenses 735,000 113,208 15.40% 621,792 114,129 (921)
Excess Revenue(Expenses) (22,500) 61,921 -275.20% $ (84.421) 131,995 (70,074)
Beginning Reserves 325,200 2,000,000 (32,841) 2,032,841
Ending Reserves $ 302,700 $2.061,921 _$1,962,767
6.+
Section 5- Page 2
ORANGE COUNTY SANITATION DISTRICT
Finance Department
(714) 962-2411
www.ocsd.com
Mailing Address:
P.O. Box 8127
Fountain Valley, California
92728-8127
Street Address:
10844 Ellis Avenue
Fountain Valley, California
92708-7018
OCSD 9/30/04
. S
i
i
Orange County Sanitation District
Corporate Identity Program
Phase 1 - Final Report
WN
. A"M�, Me :• \ :1111 1 R I F 7 1 N
October 10, 2004
Mi
ww
ow
w
Orange County Sanitation District
Corporate Identity Program
Phase 1 — Final Report
10/4/04
Johnson lUkropina
Iwo
Md
r
HI \ :
C K E A T I V E M A R K E T I N G
Orange County Sanitation District
Corporate Identity Program
Phase 1 — Final Report 10/4/04
Executive Summary
Johnson IUkropina (JIU) was selected to perform an assessment of OCSD's
current identity and determine if it needed to be changed. The assessment
included the following:
• Service area demographic review
• Media audit
• Peer review of similar agencies
• Focus groups of ratepayers
• Quantitative survey of ratepayers
• Employee interviews
• Executive Management Team (EMT) interviews
• Board member interviews
Based on the above activities, we conclude the following:
• Orange County Sanitation District (OCSD) is confusing for the general
public, who ascribe trash and solid waste management rather than
i wastewater treatment to the term "sanitation."
• "Orange County" is thought to encompass the entire county, but this is
a much less important issue.
• There is general agreement that the current name does not
encompass the mission and scope of the agency, primarily because
the correct use of the term "sanitation" is widely unknown.
Does the name need to change?
• While the public would like to know what the agency does, they do not
engage directly with OCSD.
• Employees want a more descriptive name but lack the will to change.
• EMT members want a new name
• The Board appears to lack the political will to take on the issue of a
name change.
JIU recommendation:
Do not change the name or logo. It is too costly for the benefit received.
Instead, consider adding a more descriptive tagline that becomes integrated
with the name and logo. Taglines are used by many companies to clarify their
name and deliver additional messaging about themselves. (See page 17 and
18 for examples.) A tagline can be phased in as new materials are printed,
vehicles are acquired or refurbished and supplies are restocked.
24 Executive Park, Suite 250, Irvine, CA 92614-6738
phone fax a-mail
9 4 9.8 5 2.5 9 6 0 949.852.2090 mail@j-u.com
I"
I
Orange County Sanitation District
Corporate Identity Program
Phase 1 Final Report 10/4/04
Background and Scope of Project
On March 11, 2004, OCSD issued an RFP to find a qualified firm or
consultant team to conduct customer awareness and perception surveys to
gather baseline information and report on findings. This was deemed Phase
1. Phase 2 is planned to be a review of the current Corporate Identify System
and assessment of all data from Phase 1, resulting in a recommendation for
change or no change. Phase 3 would then be educational marketing
campaign to promote a positive agency image and identity to the general
public and target audiences in OCSD's service area. Phases 2 and 3 were
scoped to be handled under a separate procurement from Phase 1.
RFPs were due on April 20, 2004 and Johnson IUkropina received notice to
proceed on May 21, 2004. The kickoff meeting with OCSD Communications
Staff and JIU project team was held on June 3, 2004. The team collectively
determined that research must be completed for the October cycle of EMT,
I FAHR and Board meetings.
The goal of this identity project is to establish a corporate identity system that
clearly communicates the Orange County Sanitation District's function and
vision. Overall corporate identity objectives include:
• Increase public awareness of who OCSD is and what the District does
• Have the public perceive OCSD as the essential service it is
• Position OCSD within the community
• Reinforce positive messages
.r • Determine the needs and expectations of the Community
• Increase stakeholder involvement
Phase 1 consists of qualitative and quantitative research analysis. The tasks
and deliverables are as follows:
Tasks
1. Conduct research studies of:
a. OCSD's service area demographics and ethnic groups
b. OCSD as referenced in the media, including past and current events
from news articles, technical journals, broadcasts and OCSD press
,NN releases
c. Peer review of OCSD to similar wastewater treatment agencies or
publicly-owned treatment works
.d
rr
Orange County Sanitation District Page 4
Corporate Identity Program— Final Report
I
2. Establish customer and stakeholder baseline information:
a. Conduct four focus groups and 500 random telephone surveys with
general public to explore identity, image and awareness of OCSD
b. Conduct representative random telephone surveys with 50 OCSD
«� employees, board members and Executive Management Team to
evaluate their opinion of OCSD's image and identity and what they
perceive customer's opinions to be
Deliverables
1. Report, including an executive summary and separate review of
findings for each element of the statement of work tasks, and
appendices with raw or supporting documentation.
Project Methodology
Because of the need to collect a vast amount of information in a compressed
timeframe, the JIU project team elected to conduct external residential
ratepayer research concurrently with internal interviews with employees, EMT
and board members. Simultaneously, the team collected market information
about the service area, press relations and conducted peer reviews.
External residential ratepayer research was conducted by FLEXO HINER &
Partners and the balance of the research was conducted by JIU. The analysis
contained in this report was performed by JIU.
Task is — Service Area Demographics
OCSD service area demographic/ethnicity tables can be found in Appendix 1.
Demographics were used to ensure an appropriate balance of participants
were solicited for the focus groups and quantitative telephone survey.
Task 1 b— Media Review
JIU undertook a media review to see how the agency and the media
characterize the name of the agency.
OCSD Internally Prepared Documents
Internally, OCSD refers to itself as:
• Orange County Sanitation District
• Orange County Sanitation District (OCSD)
i • Orange County Sanitation District (District)
0 OCSD
.d
Orange County Sanitation District Page 5
Corporate Identity Program—Final Report
Press releases found at ocsd.com sometimes use the full name in the title
and sometimes the acronym OCSD.
The full name always appears somewhere in the release albeit one was found
••� where it only appeared as the "where" for a public meeting and OCSD was
used otherwise.
Some releases use the full name and the acronym and some use only the full
name in the headline or leading copy line. If the acronym is not in the lead, it
may still be used in the body of the release without explanation.
Two fact sheets found on the site refer only to OCSD although the logo is also
on the page; and the assumption is that people can determine the authoring
agency. Two other fact sheets used the full name and the acronym
Some technical documents found on the site use "District" after the full name
instead of the acronym.
+�+ Search Engines
Popular internet search engines Google, Go2, Lycos, MSN and Yahoo were
utilized to search keywords OCSD, sanitation, sanitation district, wastewater,
wastewater treatment and sewage.
All searches for OCSD returned Orange County Sanitation District in the first
or second position. The second position (google) does not alphabetize
through the URL so Sheriff Department (org) places before Sanitation District
(com).
These searches all also returned Sheriff in 1 s, or 2"d position with Oswego
two School District, Oxford Learning Center and OCSD Interactive Games
rounding out the top 5.
The following table shows the relative position of OSCD for each search term:
OCSD Sanitation Sanitation Wastewater Wastewater Sewage
Now District Treatment
Google 2 2 Not in top 5 Not in top 5 Not in top 5 Not in top 5
No go2 1 3 Not in top 5 Not in top 5 Not in top 5 Not in top 5
Lycos 1 2 Not in top 5 Not in top 5 Not in top 5 Not in top 5
msn 1 2 Not in top 5 Not in top 5 Not in top 5 Not in top 5
Yahoo 1 2 Not in top 5 Not in top 5 Not in top 5 Not in top 5
I
`r Orange County Sanitation District Page 6
Corporate Identity Program—Final Report
Note that the city of Austin was in the top 5 for"wastewater" under Google.
King County was in the top 5 for "wastewater treatment" under Google, MSN
and Yahoo.
The following table shows the number of returns against each search term:
OCSD Sanitation Sanitation Wastewater Wastewater Sewage
District Treatment
Google 15,400 332,000 2,200,000 1,200,000 2,700,000 2,200,000
go2
Lycos 3,000 8,600 484,000 293,000 492,000 545,000
msn 3,000 8,300 473,000 299,000 472,000 552,000
Yahoo 16,000 417,000 2,300,000 1,500,000 2,400,000 2,620,000
Note that go2 does not provide volume of results for searches.
Newspapers
Two hundred forty-two (242) items were found for OCSD in a search of
y Orange County Register ster (includes Irvine World News, Fountain Valley View,
Huntington Beach Wave and Laguna News Post) archives (2002 to present).
At least half were classified/employment ads.
Twenty-eight (28) articles were read. One was not about OCSD (it was about
other sanitation district rates) and might have been a sidecar to a story about
OCSD run the same day.
None of the articles used the full name in the title (most frequently "sanitation
district" appeared in headline) although most used the full name the first
mention and moved to "sanitation district' or "district" or "agency" in
subsequent mentions.
One article used only "O.C. Sanitation District' in the story. Four of the 27
articles also used the acronym OCSD.
Forty-two (42) items were found in the Los Angeles Times (includes
Huntington Beach Independent, Daily Pilot and Coastline Pilot) archives
(2002 to present). All were articles —there were no classifieds.
`w Fifteen of the sixteen (16) articles read made first mention of "Orange County
Sanitation District." One article was about Orange County pension payments
too in general and referenced "...Orange County Transportation Authority, the
I Sanitation District and the Fire Authority."
ow
Orange County Sanitation District Page 7
Corporate Identity Program—Final Report
I
Roughly equal percentages of the articles had positive and negative slants
regarding the agency (32% and 34% respectively). A significant percentage
were simply factual reports (23%) and the remainder were not specific to any
event or issue at OCSD (11
Articles long enough to reference more than one time generally followed first
mention with "the district," "sanitation district,"or "the Agency."
Technical Journals
In the timeframe of the research compilation, only online sources could be
checked. Articles were found in Water & Wastes Digest, U.S. Water News
and Water Environment Research. All references in Water & Wastes included
full name albeit one story abbreviated California as "Calif." U.S. Water News,
in a 1998 article, referred to the organization as "County Sanitation Districts of
Orange County."
Mai
Summary Task 1 b
There are varying degrees of inconsistency with which the organization is
-� named in the media yet most often the communication is clear that
OCSD/Orange County Sanitation District is the subject. Writers apparently
I carefully consider the audience and use appropriate names, acronyms and
abbreviations to ensure clarity of communication.
Task 1 c — Peer Review
JIU conducted interviews with four agencies:
Metro Wastewater Reclamation District (Denver)
Steve Frank, Public Information Officer, (303)286-3000
.r
Sanitation Districts of Lost Angeles County
Joe Haworth, Information Officer, (562)699-7411
fto
Central Contra Costa Sanitary District
Harriette Heibel, Community Affairs Manager, (925)229-7310
Irvine Ranch Water District.
Pat Brockley, Purchasing Manager, Susan Gallagher, Purchasing
Coordinator, (949)453-5300
Johnson IUkropina was unable, after multiple attempts, to make contact with
King County Department of Natural Resources and Parks of Washington,
East Bay Municipal Utility District, and Sacramento Regional County
Sanitation District.
Orange County Sanitation District Page 8
Corporate Identity Program—Final Report
i
It was difficult to establish contact with the person at the above agencies who
could provide information about agency identities, experiences with name
recognition, name confusion or name changes and branding strategies and
programs.
For the most part, the agencies contacted could identify the mission or vision
of their agency but either did not have knowledge of a brand i ngAd entify
strategy or advised that it was not a priority or concerted effort at their agency.
Reviews of their websites and collateral material demonstrate varying levels
of brand implementation.
Target markets are universally acknowledged to be "anyone who flushes a
toilet' and to some extent additional stakeholders such as local government
were also acknowledged as a target audience.
bow
Overall, the agencies interviewed acknowledged that the public has little
interest in their services and little involvement unless impacted personally by
-�+ a particular issue.
I A higher emphasis was placed on public outreach and education. Outreach
efforts discussed include:
• Newsletters (up to two per year)
• Public Meetings (town hall type where public is invited in to ask
questions)
• Participation in events/shows with booths (e.g. Home & Garden)
• Alignment with environmental groups
• Alliances with diverse groups from Girl Scouts to local farmer
associations
• Partnerships with water district if not the same agency
• Regular contact with news reporters/agencies
• Web support (e.g. customer service and FAQs)
• Visits to schools from brief presentation/videos to week long simulated
treatment plant on school site
• Tours for public, interested groups and particularly schools (including
provision of bus transportation for students)
Effectiveness, if measured, was often based only on quantity of people
contacted. One agency tests students before and after class visits or tours.
Of the agencies contacted, Metro Wastewater Reclamation District undertook
a name change in 1990 from the Metropolitan Denver Sewage Disposal
District No. 1.
`r Orange County Sanitation District Page 9
Corporate Identity Program—Final Report
i
Summary Task 1 c
When the activities of peer agencies are compared against OCSD's corporate
identity objectives, it becomes clear that their focus is mostly about outreach
and in increasing public awareness of who the agency is and what it does. To
a lesser degree is the attempt to increase stakeholder involvement.
Brand efforts such as positioning the agency as delivering the essential
service it provides as well as positioning within the community is assumed to
come as a result of outreach activities.
Most peer agencies are not engaging in true branding as a strategized
priority. The belief is that outreach brings education and awareness, which
translates to branding. The missing link is branding that leads to "investment"
— stakeholder knowledge and understanding at a level that satisfaction,
kinship and even ownership is present. "I know them." "They understand me
,.� and take care of my needs." "They do things the way I would." "I prefer to do
business with them." "I trust them."These are the stakeholder investments
that can be missed when outreach is substituted for branding. Outreach can
certainly educate the public about what you do and who you are but it does
not build the bond that branding solidifies.
Task 2a —Qualitative (Focus Groups) Survey
Methodology
Four focus group discussions were hosted by Flexo Hiner June 29-30, 2004—
two each in Irvine and Orange. The primary purpose of the focus groups was
to collect information in preparation for the telephone survey and to "take the
pulse" of the public regarding OCSD.
,.. Participants were screened to include only registered voters, with the
rationale that registered voters would generally be more informed about
issues impacting the county. Roughly equal numbers of participants were:
• Homeowners and renters
• Married and Single
• Clusters of ages 18-35, 36-55 & 56+ years of age
Caucasian and other ethnicities
Male and female
9 With and without children at home
I
ar
Orange County Sanitation District Page 10
Corporate Identity Program—Final Report
w+
I
Participants by community were as follows:
Number of
City Participants
Anaheim 2
Costa Mesa 1
Fountain Valley 2
Fullerton 1
Garden Grove 2
Huntington Beach 4
Irvine 3
Newport Beach 1
Orange 1
Placentia 2
Santa Ana 8
Tustin 5
Villa Park 3
Yorba Linda 3
Summary of Focus Group Findings
OCSD is, for residents, a blank page. There is virtually no awareness of the
name or acronym OCSD and little is known about the agency's functions.
The current name communicates the wrong identity. The individual words of
the name imply functions that are very different from reality. And, when the
functions that it does handle are outlined for residents, they do not include all
that residents would expect.
• Recognition of the name "Orange County Sanitation District' was
virtually zero.
• When asked to speculate about its functions the most often mentioned
were "trash collection" and "sewage" (not"treatment'). Other functions
are attributed to OCSD — no doubt based on the confusion about trash
collection — such as recycling and landfills.
Residents did not appear overly concerned that "Orange County" within the
District's name doesn't encompass the entire county.
• This part of the name does imply coverage of the entire county. There
is, however, little concern that the coverage is not the entire county
• There is little concern that the name implies that the district is overseen
by the Board of Supervisors versus a Board composed of city council
officials
Orange County Sanitation District Page 11
Corporate Identity Program— Final Report
Task 2a — Quantitative (Telephone) Survey
The qualitative phase of the residential research was designed to fuel
development of the questionnaire that was used in the quantitative phase that
is reported here. The quantitative study has sought to determine
quantitatively:
• The incidence of confusion among OCSD served households about its
y' identity (role and responsibilities)
• Strategic and tactical priorities that residential households would like to
see in the conduct of those agencies of government who manage
water.
Methodology
Randomly selected households in the OCSD service territory were contacted
by telephone by Flexo Hiner. 501 interviews, averaging 8 minutes in length
were completed. The specific respondent in each household was either the
utility bill-payer (renters) or the person who typically pays the property taxes
(homeowners).
The portion of all respondents from the following communities in this survey:
Anaheim 12%
Huntington Beach 11%
Irvine 9%
Fullerton 8%
Garden Grove 8%
Orange 8%
Santa Ana 7%
Newport Beach 6%
Yorba Linda 5%
Fountain Valley 4%
Costa Mesa 4%
Tustin 4%
La Habra 3%
Placentia 3%
Brea 2%
Seal Beach 1%
Westminster 1%
Los Alamitos 1%
Cypress <0.5%
Stanton <0.5%
Villa Park <0.5%
Midway City <0.5%
Now Other 3%
t"
WW
Orange County Sanitation District Page 12
Corporate Identity Program—Final Report
Study participants included:
Renters 27%
Homeowners 73%
Married 60%
Not Married 40%
With children at home 45%
No children at home 55%
Caucasian 66%
Hispanic 12%
Asian-American or a Pacific Islander 8%
Native American 2%
African American 2%
Other 7%
Refused /Don't Know 3%
Now 18-35 20%
36-55 43%
56+ 37%
.r
Findings
I OCSD has very low (4%) unaided awareness, which rises to 74% when
added with aided awareness.
On an unaided basis ("who is responsible for..."), respondents were virtually
unable to name OCSD's service functions. On an aided basis, 30% of the
respondents ascribed garbage collection and 27% sewage treatment and
disposal functions to OCSD. By far, city governments are perceived most
often to be responsible for the task of water treatment (28%), garbage
collection (31%), supplying water to homes (42%), water reclamation (11%)
«. and storm drainage system (16%).
The survey also delved into the priorities for agencies of government who
have responsibility for managing water to help understand what the public
perceives as important. The number one social value is "protecting public
health" (71%) followed by "being proactive" [in decision making] (65%). The
respondents were then asked about tactical priorities and forced to make
tradeoffs. The top tactical priority was "protection of the groundwater from
industrial pollution" (67%), which is a reflection of the protection of public
health priority mentioned above. Clustered in the next set was "assurance of a
reliable water supply" (58%) and "safe disposal of treated sewage water"
too (56%).
Now
WW
Orange County Sanitation District Page 13
Corporate Identity Program—Final Report
Telephone Survey Conclusions
In the final report for the quantitative report, Flexo Hiner emphatically states
that the OCSD identity must be changed. It is clear that the public is confused
about who is OCSD and what it does. The current name gives the public no
clues about its scope or mission. The priorities of residents in the context of
an agency that has water management responsibilities are clear. They want
to know OCSD is an agency that:
• Proactively protects public health
• Helps assure future water supply
• Does so in an honest and trustworthy manner
Flexo Hiner concludes with a possible positioning to resonate with the general
public: build the reputation as the water agency that Proactively Protects
Public Health.
Task 2b— Employee, Board and Executive Management Team
Interviews
Concurrent with the focus groups and quantitative survey, JIU conducted
I interviews from June 16 to September 8, 2004 with the following groups of
stakeholders within the OCSD organization:
• Employees: 46 telephone interviews completed. (Over 300 calls were
placed in attempt to interview 50 employees.)
• Executive Management Team (EMT): 8 in-person interviews
completed. (Only the GM was included in scope of work. Scope was
expanded, with no change order, to include entire team.)
• Board Members: 11 interviews completed. (10 in-person, 1 telephone.)
�+ The subject of the interviews was to gather respondent perceptions of the
OCSD name and how they refer to the agency when speaking with members
of the public, what confusion may exist, and if they were going to rename the
agency, what that name would be.
As a baseline, it is interesting to note that almost every single employee
voluntarily expressed pride in the agency. They were able to express the
mission of the agency and believe that they personally, and the agency as a
whole, are fulfilling that mission every day. With EMT members, each was
cognizant of the mission and of the existing and under-development unifying
strategies of the organization.
No Orange County Sanitation District Page 14
Corporate Identity Program—Final Report
I
In general, most employees, EMT and board members acknowledge that the
public is confused by the term "sanitation." While it is a technically accurate
term, it is often confused with trash and solid waste. The term also does not
encompass what many see as the expanded mission of the agency:
management of wastewater, pollution control and watershed protection.
Most respondents prefer incorporating terms within the name that are more
descriptive of the agency's activities, such as (in alphabetical order):
• Pollution control
• Wastewater management
• Wastewater treatment
• Water protection
• Water quality management
• Water resource management
• Water treatment
• Watershed management
Respondents indicated, to a much lesser degree, that the name "Orange
County" causes some confusion with the County of Orange and because the
District does not cover the entire county. Several respondents recalled the
District's previous name (Consolidated Sanitation Districts of Orange County)
as being more descriptive of the geography and not implying total blanket
saturation of the county.
Yet, when asked if the agency needs a new name, the results were clearly
mixed: employees and the board were less in favor of changing the name,
whereas the EMT was more strongly in favor of a name change. Employees
who did not want to change the name generally felt there was not a better
,.� name. Those who wanted to change felt a new name would cause less
confusion.
EMT members felt that the current name doesn't capture the essence and
mission of the agency and a new name could be more descriptive.
Board members not in favor of the name change were either satisfied with the
current name or were concerned about the cost of the name change and
uncertain whether the confusion justified such expenditure. There does not
appear, from the sample pulled, to be sufficient political will to undertake a
name and identity change.
Summary Task 2b
I While it is generally felt that the current name does not encompass the scope
Now or mission of the agency and, in fact, causes confusion in the public, there is
"r Orange County Sanitation District Page 15
Corporate Identity Program— Final Report
no strong conviction that the name could or should be changed.
Employees do not see that a name change would result in an improvement, in
other words, they do not see a benefit of changing the name of the
organization. This is not surprising because most people tend to resist
change. EMT members are more inclined to look favorably at a change. While
the board was clearly mixed, this does not appear to be the issue to arouse
�+ passion and cause a groundswell of support to override the concerns of those
members who feel it is imprudent to change.
low
Conclusion
From OCSD's Communication Service Strategic Plan FY 03-04, OCSD has a
`�' wide list of audiences. In the following table, we've broken down those
audiences based on the communication they receive about OCSD:
No
Name & Logo Name Only Possibly Not Even Name
Board of Directors Community leaders Business and industry
�+ County of Orange, Elected officials — local, Chambers of Commerce
Board of Supervisors state and federal within the service area
Employees Environmental Groups General public and the
community
Media — local, regional, Opinion leaders Ratepayers
state and national
Orange County Grand Jury Schools/students
Regional, state and Stakeholders
national regulatory
agencies
Special interest groups Taxpayer groups (Orange
County Taxpayers
Association)
Trade organizations (e.g.,
AMSA, CASA, CWEA,
WEF
Water districts and
producers (e.g., OCWD,
MWDOC)
Note that audiences are categorized in the table based on direct contact with
OCSD — not based on what they may hear/read in media reports, which would
typically be a name or abbreviation only.
kEw
Orange County Sanitation District Page 16
Corporate Identity Program—Final Report
I
Research conducted through this contract reveals much confusion about the
identity of OCSD. This is not surprising in light of the fact that OCSD as an
agency is virtually transparent to the general public; there is no monthly or
quarterly bill aside from a possible line on a city utilities billing (see sample in
,ow Appendix 3) to tie the agency to the public's consciousness and the line item
on the property tax bill (OCSD Sewer Use Fee—see sample in Appendix 3) is
not enough to raise public consciousness. Unless there are issues "in the
public" eye being reported by the media, there is little contact, and little desire
for contact, between the public and the agency.
low The quantitative survey does indicate that confusion over the identity of
OCSD can lead to public perception that the agency's total mission is not
being fulfilled. However, this must be weighted against the potentially
WW monumental task of clarifying the agency identity—with no guarantee of
success with an audience that admittedly isn't that interested on a daily basis
— and the cost of such an attempt. There is also a factor that the public will
�+ not accept the clarifying communication unless it is relevant to them at the
time and, again, the audience has expressed some disinterest in learning
more as it relates to wastewater.
This research (quantitative and all the qualitative tasks) tells us that there is
interest from the public that the "job gets done" and even more interest in
securing a safe and plentiful water supply and protecting the environment.
While the present name of the agency doesn't help clarify the agency's
low services, mission or scope, it also does not apparently do damage to the
agency either.
Ind Although not in the scope of this contract (Phase 2 is planned for review and
assessment of the current identity and recommendation for possible change),
am research under this contract does not indicate sufficient political will to make a
name change viable at this time.
JJU would suggest the following options for OCSD when it comes to an
identity change:
1) No change. With this option nothing is changed and subsequent phases of
this program would entail the building of a brand identity manual that includes
the brand personality of the agency as well as the graphic standards for use
of the existing name and the existing logo. Cost implication for building the
manual is estimated from $5,000 to $7,500. Distribution and implementation
of the manual is unknown.
This option is not recommended since there is opportunity for improved
l communication and because the existing name and logo do not convey the
current business strategy, scope, mission or position of the agency.
kMM
Orange County Sanitation District Page 17
Corporate Identity Program—Final Report
i
2) Keep the name and change the logo. Under this scenario only the logo
would be changed with the aim of bringing clarity of mission/scope to agency
communication. Logo changes can range from $5,000 to as much as you
could possibly budget with costs dependent on the firm selected for the
project, the number of explorations and the number of revisions. Estimate for
an organization the size of OCSD is $25,000-$50,000. As with Option 1,
implementation costs could not be estimated with the data available.
This option is not recommended based on the fact that the logo is often not
part of the communication and therefore would be an expensive but oft
unused adjunct. Additionally, there is considerable debate and derision over
the current Los Angeles City logo situation and OCSD would undoubtedly be
associated with it in some way.
3) Change the name and the logo. This implies and entails a massive effort,
not just in developing a new name and logo to satisfy all the requirements of
the agency's mission, strategies and positioning but also the myriad of
stakeholders in the process. As with Option 2, this can be a costly project.
Estimates are in the $35,000 to $75,000 range with implementation unknown.
This option is not recommended based on the extensive cost involved and the
fact that there is apparently not support from the board to make such a
change.
4) Add a tagline to the existing name and logo. This allows the agency to
clarify the communicated confusion of the name and logo with a brief
statement that becomes permanently associated with the name and logo.
Delivery of a tagline could be in the $5,000 to $15,000 range. As with the
other options, implementation costs are unknown.
This tagline could be phased in as new materials are printed, added to
vehicles with decals, etc.
A tagline can be used to clarify an organization's services/products and
�+ deliver additional messaging that the organization wants their customer to
have —even when the company name might be meaningless. As an
outgrowth of a company's positioning, it can be the underpinning on which
communication is built.
Examples include:
• People Soft "We work in your world"
I • Lincoln "What a luxury car should be"
• Timken: "Leader in bearings and steel"
0 PK Ware "The data compression experts"
tow
Orange County Sanitation District Page 18
Corporate Identity Program—Final Report
i
• Netcom "We put the Net to work for you"
• Microway "Technology you can count on"
• Anderson Consulting "Business performance improvement"
• Dell Computer "Be direct"
Mal • The United States Post Office "We deliver"
• Ameritech "In a world of technology, people make the difference"
• Citibank "The Citi never sleeps"
'md • Jazz Jamaica "The world's favorite dance band"
• General Electric: "We Bring Good Things To Life" "Imagination at
Work"
kmd • Hyatt Hotels: "We've Thought of Everything"
• Lexus: "The Relentless Pursuit of Perfection"
WW • British Airways: "The World's Favorite Airline"
• King County Department of Natural Resources "Clean Water — A
Sound Investment'
,o, • Metro St. Louis Sanitation "Your Clean Water People"
• Inland Empire Utilities Agency "Clean, inexpensive, plentiful water"
• Monterey Regional Water Pollution Control Agency "Turning
WNW Wastewater into Safe Water"
• Union Sanitary District "Protecting human health and the environment"
• Mt. View Sanitary District"A Friend to the Environment"
• Ontario Water Agency "The Clean Water Experts"
• Tacoma Water "Pure. Reliable. Precious Water.
• Fox Metro Water Reclamation District"Giving Water a Second Chance"
tow • D.C. Water & Sewer Authority "Serving the Public. Protecting the
Environment."
kw • Sacramento Regional Sanitation District "Technology in Balance with
Nature"
Based on the research from Phase 1, the option of adding a tagline to the
existing name and logo would be Johnson I Ukropina's recommendation for
OCSD. Such a tagline can clarify the confusion engendered by the word
"sanitation" in OCSD's name. We do not believe that the tagline needs to
clarify confusion about OCSD's service area, which is not a relevant issue to
most people. It should communicate the agency's mission, to some degree its
scope and solidify in the consumer's minds that the agency is working for
them, on issues important to them.
I
now
�I
�I
�I
i
r
i
, I
I
I I 1 1
Environmental Stewardship
5'
c�
fn
N
I ,
T
+1
LLI
W
M -�
c t.. I
;�; � ��►�/ice. j�� . .
Wastewater Management
• - dF • • 1 1 1
m
ONO
mb
aw ORANGE COUNTY SANITATION DISTRICT
ORANGE COUNTY, CALIFORNIA
40 COMPREHENSIVE ANNUAL FINANCIAL REPORT
FOR THE YEAR ENDED JUNE 30, 2004
Mw
wj
Prepared By:
Department of Finance
Accounting Division
Michael D. White, CPA
,�, Controller
I�
I..I
�W
(THIS PAGE LEFT INTENTIONALLY BLANK)
.V
�1
E
W
u
W
W
6r
i
ea
WO
ORANGE COUNTY SANITATION DISTRICT
Comprehensive Annual Financial Report
Table of Contents
40' For the Year Ended June 30, 2004
Pape
INTRODUCTORY SECTION:
Letterof Transmittal..................................................................................................................... i
GFOA Certificate of Achievement............... "'
CSMFO Certificate of Award ....................................................................................................... ix
Board of Directors
OrganizationChart....................................................................................................................... xi
Mapof Service Area..................................................................................................................... xii
�a
FINANCIAL SECTION:
Independent Auditors' Report....................................................................................................... 1
Management's Discussion and Analysis—Required Supplementary Information....................... 3-8
Basic Financial Statements:
Statement of Net Assets...................................................................................................... 10
Statement of Revenues, Expenses, and Changes in Net Assets ...................................... 11
Statementof Cash Flows.................................................................................................... 12
Notes to Basic Financial Statements................................................................................... 13-27
Supplementary Information:
Combining Statement of Net Assets ................................................................................... 30
Combining Statement of Revenues, Expenses,and Changes in Net Assets .................... 31
Combining Statement of Cash Flows.................................................................................. 32
Schedule of Changes in Net Assets by Activity and Revenue Area.................................... 33
STATISTICAL SECTION:
Net Assets by Component—Last Four Fiscal Years ................................................................... 35
Revenues and Gross Capital Contributions by Source-Last Ten Fiscal Years.......................... 36
Expenses by Type- Last Ten Fiscal Years.................................. ......... 37
.......................................
Change in Net Assets—Last Four Fiscal Years ...................................................
Cash and Investments Reserves Balances—Last Ten Fiscal Years .......................................... 39
tow Cash and Investment Portfolio—Current Fiscal Year.................................................................. 40
Assessed and Estimated Actual Value of Taxable Property-
LastTen Fiscal Years............................................................................................................... 41
Property Tax and User Fee Levies and Collections-Last Ten Fiscal Years............................... 42
1;10 Property Tax Rates- Direct and Overlapping Governments-
LastTen Fiscal Years............................................................................................................... 43
Principal Users—Current Fiscal Year and Nine Years Ago......................................................... 43
No Number of Accounts and Revenues by Customer Class—Last Ten Fiscal Years...................... 44
Annual Sewer Service Charges, SFR—Last Five Fiscal Years and Next Fiscal Year................ 44
Comparison of the Volume of Wastewater Treated With Revenues and Expenses-
LastTen Fiscal Years.............................................................................................................. 45
ow Property Value and Construction - Last Ten Fiscal Years ........................................................... 46
Ratio of Annual Debt Service for Bonded Debt to Total Expenses—Last Ten Fiscal Years....... 47
Bond Coverage- Last Six Fiscal Years........................................................................................ 48
Computation of Direct and Overlapping Debt—Current Fiscal Year........................................... 49
Demographic Statistics-Last Ten Fiscal Years
Estimated Populations Served by the Orange County Sanitation District.................................... 51
Insurancein Force........................................................................................................................ 52
Authorized Full-time Equivalents by Function—Last Ten Fiscal Years ....................................... 53
Biosolids Produced - Last Ten Fiscal Years ...................................... ......... 54
.................................
MiscellaneousStatistics............................................................................................................... 55
e.
L,F
W
(THIS PAGE LEFT INTENTIONALLY BLANK)
W
� I
is
W
I,
W
U
i
1,
Wei
ammi
;
dr
Introductory Section
r
w
r
rr1
r
see
troduct°ry
�n
ORANGE COUNTY SANITATION DISTRICT
9
i
Ij
September 3, 2004
phone:
714)962-2411 The Board of Directors of the
fax: Orange County Sanitation District,
714)962-0356
Orange County, California
www.ocsd.com
mailing address: Submitted herewith is the Comprehensive Annual Financial Report of the Orange County Sanitation
P.O. Box 8127 District, Orange County, California for the fiscal year ended June 30, 2004. This report includes the
untain Valley,CA
sz7ze 8 CA financial position and activity of individual revenue areas, as described within the Governmental Structure
below, as of June 30, 2004 and was prepared by the Accounting Division of the District's Finance
street address:444 Ellis Avenue Department.
,-jntain Valley,CA
�. 92708-7018 Responsibility for both the accuracy of the data, and the completeness and fairness of the presentation,
including all disclosures, rests with the District. To the best of our knowledge and belief, the enclosed
Member data is accurate in all material respects and is reported in a manner designed to present fairly the financial
Agencies position and results of operations of the District. All disclosures necessary to enable the reader to gain an
® understanding of the District's financial activities have been included.
Cities
The report presented herewith consists of three parts: (1) an introductory section consisting of a letter of
�. Anaheim transmittal, awards received for the prior year's Comprehensive Annual Financial Report, a listing of the
Brea Board of Directors, an organization chart, and a map of the individual revenue areas; (2) a financial
Buena Park
Cypress section consisting of the independent auditors' report, Management's Discussion and Analysis of the
Fountain Valley Financial Statements, basic financial statements, and supplementary financial statements and schedule of
Fullerton the individual Revenue Area Funds; and (3) a statistical section consisting of pertinent financial and
Garden Grove nonfinancial data that resents historical trends and other information about the District.
mtington Beach p
Irvine
La Habra Included within the accompanying financial statements are all of the organizations, activities, and functions
La Palma Los Alamitos controlled by the District's Board of Directors in accordance with the Governmental Accounting Standards
Newport Beach Board Statement Number 14, "The Financial Reporting Entity For the purpose of this evaluation, control
Orange was determined by the Board's responsibility for: (1) adoption of the budget and user charges, (2) taxing
Placentia authority, and (3) establishment of policies. The reporting entity and its services are described in further
Santa Ana
Seal Beach detail in Note 1 of the financial statements.
Stanton
Tustin
Villa Park GOVERNMENTAL STRUCTURE
Yorba Linda
f inty of Orange The Orange County Sanitation District encompasses the Northern section of Orange County. The District
provides wastewater treatment for an area of the County covering 471 square miles and serving a
SQnitary Districts population of approximately 2.4 million, or 81 percent of the County's population. The District was
originally incorporated in 1954 as nine separate public corporations, or districts. In April of 1998, at the
Costa Mesa District's request, the Board of Supervisors of the County of Orange passed Resolution No. 98-140
Midway City ordering the consolidation of these nine County Sanitation Districts into a new, single sanitation district, to
'ater Districts be known as the Orange County Sanitation District, effective July 1, 1998. This action was recommended
to the Board by the Local Agency Formation Commission in order to simplify governance structures,
rrv"'' H""''' reduce the size of the Board, ease administrative processes, streamline decision-making and consolidate
accounting and auditing processes. The boundaries of the nine previous districts had remained intact for
the purpose of collecting sewer user fees at the previously established rate schedules, and were referred
T to as nine individual revenue areas through June 30, 2000. Effective July 1, 2003, all Revenue Areas,
except Revenue Area 14, consolidated user fee rates and all enterprise fund accounting and budgeting
activities and are now known as the Consolidated Revenue Area.
i
To maintain world-class leadership in wastewater and water resource management.
4�
�J
The District is managed by an administrative organization composed of directors appointed by the r
agencies or cities which are serviced by the District. Each of the two remaining Revenue Areas, the
Consolidated Revenue Area and Revenue Area 14, has its own budget and is responsible for the
construction and maintenance of its own collection system. All Revenue Areas, except Revenue Area 14
and the portion of the Consolidated Revenue Area previously known as Revenue Area 13, receive their f
own share of the one-percent ad valorem property tax levy. In addition, all Revenue Areas except LI
Revenue Area 14, collect user fees from property owners. Revenue Area 14 receives all of its revenues
from service charges to the Irvine Ranch Water District. { `
The purpose of the District's wastewater management program is to protect the public's health, preserve
the beneficial uses of the coastal waters, and maintain air quality. The objectives of operating the
treatment plants are to process and dispose of the treated wastewater and the separated solids in
accordance with Federal, state, and local laws including the Environmental Protection Agency. {•�
The District sewerage system includes approximately 650 miles of sewers that convey wastewater i
generated within the District's boundaries to the District's two wastewater treatment plants, Reclamation
Plant No. 1 located in the City of Fountain Valley, and Treatment Plant No. 2 located in the City of
Huntington Beach.
Plants No. 1 and No. 2 have primary treatment capacities, including standby, of 108 million gallons per
L�
day (mgd) and 168 mgd, respectively. Approximately 60 percent of the advanced primary effluent also
receives secondary treatment. Both plants are master-planned for a future primary and secondary
treatment capacity of 240 mgd for a combined total of 480 mgd.
Outflows of treated wastewater from the two plants are combined and discharged to the ocean off the f -
Huntington Beach coast through an outfall pipe that is 120 inches in diameter and approximately five miles i
long. The last mile of the outfall pipe is a diffuser that dilutes the wastewater with seawater in a ratio of t.+
148 parts seawater to one part treated wastewater at an average depth of 185 feet.
ECONOMIC CONDITIONS AND OUTLOOK
J
The Anderson Center for Economic Research at Chapman University is forecasting a continuing recovery
for Orange County from 2002 with a high of 3.3 percent growth in their economic indictor series, a
composite of all of the major economic forces, in the fourth quarter of 2004 and the first quarter of 2005.
In addition, job growth is expected to continue to grow 2.5 percent during this same time period. This 1 +
translates to an average annual percentage increase of 1.9 percent in 2004 and 2.1 percent in 2005, with
net job creation of about 27,200 jobs in 2004 and 29,900 in 2005. The unemployment rate for Orange
County decreased from 4.0 percent in FY 2002-03 to 3.6 percent in FY 2003-04.
Total taxable sales is forecasted to increase 4.8 percent in 2004 and 4.9 percent in 2005 while personal
income is forecasted to increase over the same time period 5.1 percent and 5.5 percent, respectively.
Fueled by the growth on the job front, nonresidential valuation is forecasted to increase 7.9 percent, or
$79.9 million in 2004 and 4.3 percent, or$46.3 million, in 2005. Although residential valuation is expected
to achieve a 14.8 percent, or $308.0 million growth in 2004, a decline of 3.3 percent, or $33.4 million is
forecasted for 2005. According to Chapman University, higher long-term interest rates will more
negatively impact resale housing activity. As measured by the number of deeds recorded, resale activity
is forecasted to decline about 12 percent. r•�+
Chapman University is not forecasting an imminent housing price decline. Current supply conditions
remain tight and point to continued housing price appreciation, at least for 2004. The unsold housing �.rl
inventory for new homes is at historic lows. The median number of days it takes to sell a home is also at
its lowest level in history. This factor is significant, since a major downturn in appreciation has never _
occurred without being preceded by a sharp increase in this indicator.
ii
Current mortgage rates are now around six percent. Chapman University is forecasting 8 percent
mortgage rates by the end of 2005, which is similar to rates in 1999, yet this increase will almost double
the monthly payment in 2005,just six years later. This is the major reason they are calling for a drop in
resale housing prices of 2.7 percent in 2005.
MAJOR INITIATIVES
A New Ocean Discharge Permit
The District's Board of Directors decided in July 2002 to voluntarily give up its modified ocean discharge
permit, issued under section 301(h) of the Federal Clean Water Act, which allowed the District to
discharge a higher level of Suspended Solids and Biochemical Oxygen Demand than otherwise required
by the Act if we demonstrate adequate environmental and public health protection. It was for this reason,
in fact, that the U.S. Environmental Protection Agency (EPA) and the State of California issued us the
modified permit and consistently supported what we were doing.
s To obtain a renewal of its ocean discharge permit without the modification (oftentimes referred to as a
"waiver"), the District will undertake a massive capital improvement program ("CIP")of building new, and
rehabilitating existing, facilities in order for the District to operate its facilities in a manner that will allow it to
achieve secondary treatment standards as defined by the Act.
d
Achieving secondary treatment standards will take approximately 8.5 years to complete. Permits are
issued for five (5)years duration, and the EPA has no authority to waive the discharge limits requirements
or grant a longer permit (except per Sec. 301(h)). The alternative is to obtain a court order approving the
schedule and decreeing that no penalties will be imposed for discharges that exceed the secondary
treatment limits during the period of construction.
A proposed Consent Decree is under negotiation by and among the District, EPA, and the State of
California Regional Water Quality Control Board. It will be filed with the U.S. District Court with a request
to approve it pursuant to the stipulated agreement of the parties. This will be done concurrently with the
issue of the new ocean discharge permit.
On July 21, 2004, the California Regional Water Quality Board and the EPA issued a public notice
proposing to jointly reissue a National Pollutant Discharge Elimination System (NPDES) permit.
Following a joint public hearing to be held on September 17, 2004, the California Regional Water Quality
Board and the EPA will make a final decision on the approval of the District's NPDES permit.
Groundwater Replenishment System
aw The District and the Orange County Water District (OCWD) are currently developing the Groundwater
Replenishment System (GWRS) project that will be the largest water reclamation project in the nation.
GWRS is a joint effort by the two agencies to initially provide 78,400 acre-feet per year of reclaimed water
for replenishment of the Orange County Groundwater Basin and to augment the seawater intrusion
W�' barrier.
GWRS will have the capacity to divert up to 100 million gallons of water a day from the District's ocean
vi discharge during peak winter storms, which will allow the District to defer construction of an additional
ocean outfall at an estimated cost of$170 million.
iii
The District and OCWD have agr
eed to match the funding for this project. The District alone has
on of this
budgeted $251.7 million through FY 2007-08. Through the cash flow outlay fold FY 2004-05 amount Federal and
incurred with an additional $48.0 million included
State Grants are expected to reduce these local costs.
Biosolids Program
The District produces approximately 650 tons of digested and dewatered biosolids per day. The District
relies on land application of biosolids in Kern and Kings Counties in California, and at the Fort Mojave
Indian Reservation in California, Nevada, and Arizona.
Counties throughout California and Arizona have developed, or are in the process of developing,
ordinances that severely restrict or ban the land application of Class B biosolids. Kern and Kings Counties
have already banned land application of Class B biosolids. It has become clear that future requirements
for managing biosolids will be more restrictive and costs will increase as current options are eliminated.
The dynamic regulatory issues, land application ordinances and bans, and public perception challenges
prompted the District to develop a Long-Range Biosolids Management Plan. This plan was approved by
the Board in December 2003. The goal is to develop a sustainable, reliable, and economical program for
long-range biosolids management providing environmentally sound practices that meet the stringent W
federal, state, and local regulatory requirements. The Plan includes an analysis of potential technologies
and markets for biosolids derived products, an analysis of treatment plant processes to reduce overall
biosolids handling and treatment costs, and a long range implementation strategy.
In order to transition from Class B to Class A biosolids production before the Class B market collapses,
requests for proposals (RFP) have been released for biosolids management. These RFP's provide
services and facilities to participate in the markets recommended in the Long Range Biosolids
Management Plan. VW
During FY 2004-05, staff will be performing due diligence in the analysis of permitting, site selection and
financing options such as composting, peletization, and energy production. In addition, staff will be
evaluating public/private partnership scenarios in the funding of these facilities that range from an
estimate of$10-60 million.
The costs to beneficially reuse biosolids are expected to increase by about $3 million per year starting in
FY 2006-07. The FY 2003-04 budget for biosolids management alone is $9.7 million.
Asset Management w
In June 2001, the District began the initial development of a strategic level Asset Management (AM)
Improvement Program that will be followed with the eventual implementation of specific AM improvement
projects over a period of years. AM provides for the systematic planning, acquisition, deployment
utilization, control, and decommissioning of capital (infrastructure) assets. It integrates policy (strategic-
level) management, system/network (mid-level) management, and operations level management into one
focus. AM is all about maximizing the life cycle assets of public infrastructure while continuously delivering ••+
the desired level of customer service. In short, AM focuses on the optimal stewardship of community
assets. Being the sixth largest wastewater treatment facility in the nation, the District has a net capital
asset value of $1.045 billion as of June 30, 2004 and anticipates the investment of approximately $2.1
billion in new capital assets over the next decade. W-
The development of the Asset Management program was subdivided into two phases: Strategic Plan
Development, and Implementation Plan Development and Implementation. The Asset Management 4,
Strategic Plan was completed and adopted by the Board of Directors in December 2002. The strategic
plan will include; an analysis of the current state of asset management at the District, the development of
a basic and advanced asset management program tailored to the District, a gap analysis showing the
6W
iv
w
needed changes for each level of asset management, a scope of work for the implementation phase of
the effort, and approval of the plan from the Board of Directors. The Asset Management Strategic Plan is
located on the District's website under special reports.
Although the AM Strategic Plan was adopted by the Board in December, the size,complexity, and method
for the implementation approach is still being determined. The AM Strategic Plan presented a business
.r case for the District for implementation of advanced asset management practices. The business case
showed that an expenditure ranging between $22 million and $38 million over a ten year period would
conservatively save at least $350 million in life cycle asset costs over a 25 year period, save an additional
$50 million in reduced capital expenditures, as well as put the District on track to developing a platform for
sustainable infrastructure.
In April 2003, the Board directed staff to submit the Asset Management Program to an independent peer
review process with the intent of developing recommendations for the Board. That review was completed
in November 2003 and was reviewed by the Board in February 2004. The recommendation from the
independent review was for OCSD to implement advanced asset management practices. A staff driven
approach was approved in April 2004 by the Board of Directors. Full implementation of the asset
management program is projected to take up to eight years. As Asset Management is a process of
continuous improvement, the future state of asset management will continually be reviewed.
SERVICE EFFORTS AND ACCOMPLISHMENTS
In August 2003, the District was the first public wastewater agency in the nation to receive national
certification of its Biosolids Environmental Management System (EMS). An independent, third party
auditor recently confirmed that the District's Biosolids EMS meets or exceeds the standards set by the
National Biosolids Partnership. EMS is a modern management approach based on continuous
improvement and environmentally sustainable practices. This certification will help convey that the District
creates consistent, high quality biosolids. The program participants include the Source Control Division,
who ensure that biosolids product is low in metals and other constituent, the Operation Division, who
low ensure that the pathogens are adequately eliminated through heat treatment within the digesters, the
haulers and appliers, who ensure that the biosolids are tracked and used properly as a fertilizer, and the
Environmental Compliance and Monitoring Division, who ensure that the biosolids contractors are in
compliance with EMS standards.
to
In January 2004, the District received the Wastewater Treatment Plant of the Year Award for the District's
Plant No. 2 from the Santa Ana River Basin Section of the California Water Environment Association. The
award winning plant demonstrated accomplishments in compliance, original practices, cost-effectiveness,
and other indications of superior plant operations.
ACCOUNTING AND BUDGETARY CONTROLS
The District's accounting records are maintained on the accrual basis. In developing and evaluating the
�+ District's accounting system, consideration is given to the adequacy of internal accounting controls.
Internal accounting controls are designed to provide reasonable, but not absolute, assurance regarding:
(1) the safeguarding of assets against loss from unauthorized use or disposition; and (2) the reliability of
financial records for preparing financial statements and maintaining accountability for assets. The concept
of reasonable assurance recognizes that: (1) the cost of a control should not exceed the benefits likely to
be derived; and (2) the evaluation of costs and benefits requires estimates and judgments by
management. We believe that the District's internal accounting controls adequately safeguard assets and
provide reasonable assurance of proper recording of financial transactions.
v
Each year the District's Board of Directors adopts an annual operating plan. A joint works budget is first
prepared that identifies the specific capital projects and operating activities to be undertaken by the District
during the year. Upon adoption, District's staff allocates the joint works budget proportionately to
individual Revenue Areas and obtains individual Revenue Area budget approval. The budgetary level of
control, the level at which expenses cannot exceed budget, is exercised at the individual District, or fund
level. The District has adopted a Uniform Purchasing Policy that identifies the agreed upon purchasing
standards. i+,r
CASH MANAGEMENT
The District's investment portfolio, except for the District's debt service reserves, investments with the
State Local Agency Investment Fund, and overnight repurchase agreements of idle cash within the
District's general bank account, are managed by an outside money manager, Pacific Investment
Management Company (PIMCO), who performs the daily investment activities, and by Mellon Trust, who
serves as the District's independent custodian bank. This externally managed portfolio consists of a short
term investment pool of $112,427,000 at June 30, 2004 that has maturities out to 120 days, and a long-
term investment pool of $388,447,000 that has average maturities out to 2.6 years. Investments of this L%�
externally managed investment portfolio consist of U.S. Government securities, corporate bonds,
commercial paper, and money market mutual funds. Investments of the District's debt service reserves
totaling $88.0 million consist of bank investment contracts of$34.0 million with JPMorgan Bank and State
Street Bank, maturing on August 1, 2013, and $54.0 million in U.S. Government securities and open-
ended mutual funds.
Investment income includes changes in the fair value of investments. Increases or decreases in fair value
during the current year do not necessarily represent trends that will continue; nor is it always expected that
such amounts will be realized, especially in the instance of temporary changes in the fair value of
investments.
Investment earnings for the year were $6,786,000, a decrease of $19,103,000 from the prior fiscal year _
total of $25,889,000. The decrease in investment and interest income is attributable to lower yields
earned on investments that are somewhat offset by the higher cash and investment balances over the
prior year. Cash and investment balances increased in FY 2003-04 from the prior year by$179.2 million
from $427.1 million to $606.3 million, or 42.0 percent, primarily due to debt proceeds received from the -
issuance of $280 million in certificates of participation. However, yields earned on investments declined
from 5.80 percent to 1.31 percent during this same time period. '
The decline on the yields earned on investments can be attributed to the change in unrealized gains and
losses from year-to-year. As of June 30, 2003, the District had unrealized gains on investments totaling
$8,879,000. As of June 30, 2004, the District had unrealized losses of$2,617,000 for a total year-to-year
decrease in investments of $11,496,000. The District's investment policy is structured conservatively
towards liquidity to avoid having to sell investments at a loss and having unrealized losses become
realized losses.
In 1998, the District conducted an in-depth review of its reserve policy. This review included a survey of
the reserve policies of 23 other public agencies as a tool to assist in the evaluation of the underlying
economic assumptions supporting the District's reserve policy. As of June 30, 2004, the District's
designated net assets totaled $427 million, and have been earmarked for the following specific purposes
in accordance with the District's reserve policy:
Designated For Cash Flow Contingency $ 71 million
Designated For Self-Insurance 57 million
Designated For Capital Improvements 390 million
Designated For Debt Service Requirements 88 million
Total Designated Net Assets $606 mi11iQ
vi
uw
404
RISK MANAGEMENT
to For the year ended June 30, 2004, the District was self-insured for a portion of workers' compensation
and property damage. The self-insured portion for workers' compensation is $500,000 per person per
occurrence with outside excess insurance coverage to $50 million. The self-insured portion for property
damage covering fire, and other perils other than flood and earthquake is $25,000 per occurrence with
am outside excess insurance coverage to $750 million. The self-insured portion for property damage
covering flood is $100,000 per occurrence with outside excess insurance coverage to $300 million. The
District is self-insured for all property damage from the perils of earthquakes. The District also maintains
outside comprehensive boiler and machinery insurance with a $100 million per occurrence combined limit
with deductibles ranging from $25,000 to $100,000. The District is insured for general liability up to $25
million per occurrence with a self-insured portion of$250,000.
District management believes that there are no outstanding claims as of June 30, 2004 that would
materially affect the financial position of the District.
INDEPENDENT AUDIT
An audit of the books, financial records and transactions of the District is conducted annually by
independent certified public accountants. The District selected the accounting firm of Moreland &
Associates, Inc., to perform the audit for the year ended June 30, 2004. The auditors' report on the
District's basic financial statements and supplementary information is included in the financial section of
this report. This report renders an unqualified opinion on the District's basic financial statements for the
year ended June 30, 2004.
CERTIFICATE OF ACHIEVEMENT FOR EXCELLENCE
IN FINANCIAL REPORTING
The Government Finance Officers' Association of the United States and Canada (GFOA) awarded a
Certificate of Achievement for Excellence in Financial Reporting to the Orange County Sanitation District
for the District's comprehensive annual financial report for the year ended June 30, 2003. This was the
tenth consecutive year that the District has received this award. In order to be awarded a Certificate of
Achievement, a governmental unit must publish an easily readable and efficiently organized
comprehensive annual financial report, whose contents conform to program standards. Such reports
must satisfy both generally accepted accounting principles and applicable legal requirements.
A Certificate of Achievement is valid for a period of one year only. We believe that our current
comprehensive annual financial report continues to meet the Certificate of Achievement Program
requirements and we are submitting it to GFOA to determine its eligibility for another certificate.
+� ACKNOWLEDGMENTS
This report could not have been accomplished without the dedicated services of the Accounting Division
staff, and I would like to especially express my appreciation to Julie Matsumoto who assisted in its
preparation. I would also like to thank the District's Boards of Directors, the General Manager, and the
Director of Finance for their interest and support in conducting the financial operations of the District in a
responsible and progressive manner.
bid
Respectfully submitted,
Michael D.White, CPA
Controller
vii
W
Certificate of
Achievement U-6
for Excellence
in Financial
Reporting -
Presented to
Orange County
Sanitation District, California
For its Comprehensive Annual
Financial Report �+
for the Fiscal Year Ended
June 30, 2003
A Certificate of Achievement for Excellence in Financial -
Reporting is presented by the Government Finance Officers
Association of the United States and Canada to
government units and public employee retirement
systems whose comprehensive annual financial
reports(CAFRs)achieve the highest
standards in government accounting
and financial reporting.
OF ST&IS
`CWMT= President -
QUO jWW
*0�oe�AO�
Executive Director w
w
viii ,�,
r
California Societ o
y
(.�, nnicip aZ 7inance Of Leers
Certificate of Award
Outstanding Financial Reporting 2002-2003
Presented to the
X Orange County Sanitation District
This cerff"mare iv isvird in rerer,Qnl/rMr of Staerfards med rriferia is reporting
wkich rejlee►a higk fetv,'of gnnli►j,it f/re nrnnrof fianneki slatewems
and in fire uoAerfjin,T aecauurfingsist.+M fiAM which fAc.repur1A'"tore prL'parad.
March 1. 2004
Ckmir,Profmicnal do Tr(l a eal Stauiardo Cammkvc
Dedicaied to Excellence in Municipal Financial Management
ORANGE COUNTY SANITATION DISTRICT
Board of Directors
As of June 30, 2004
AGENCY ACTIVE DIRECTOR ALTERNATE DIRECTOR
Cities:
Anaheim Shirley McCracken Bob Hernandez
Brea Roy Moore John Beauman
Buena Park Patsy Marshall Jim Dow
Cypress Anna L. Piercy Tim Keenan
Fountain Valley John Collins Larry Crandall
Fullerton Don Bankhead Leland Wilson
Garden Grove Bill Dalton Bruce Broadwater
Huntington Beach Cathy Green Gil Coerper
Irvine Beth Krom Christina Shea ad
La Habra Steve Anderson Steve Simonian
La Palma Paul Walker Larry Herman
Los Alamitos Alice B.Jempsa Marilynn M. Poe
Newport Beach Tod Ridgeway Don Webb
Orange Carolyn Cavecche Steve Ambriz
Placentia Norman Z. Eckenrode Judy Dickinson
Santa Ana Alberta Christy Mike Garcia
Seal Beach Charles Antos Paul Yost
Stanton Brian Donahue David Shawver
Tustin Tony Kawashima Doug Davert
Villa Park Patricia Bortle Richard A. Freschi - -
Yorba Linda Michael Duvall Keri Lynn Wilson
Sanitary/Water Districts:
Costa Mesa Sanitary District James M. Ferryman Arlene Schafer
Midway City Sanitary District Joy Neugebauer Grace Epperson
Irvine Ranch Water District Brian Brady Peer A. Swan
County Areas:
Member of the Board of Supervisors Jim Silva Chuck Smith
i
W
x
1
vm
ORANGE COUNTY SANITATION DISTRICT
Organizational Chart
Uw June 30, 2004
7GENERAL
bd GENERAL
COUNSEL
OFFICE
ADMINISTRATION HUMAN RESOURCES FINANCE INFORMATION OPERATIONS 8 TECHNICAL ENGINEERING
AND EMPLOYEE TECHNOLOGY MAINTENANCE SERVICES
DEVELOPMENT
�d ADMINISTRATIVE HUMAN FINANCE INFORMATION OPERATIONS 8 TECHNICAL ENGINEERING
SERVICES RESOURCES ADMINISTRATION TECHNOLOGY MAINTENANCE SERVICES ADMINISTRATION
ADMINISTRATION ADMINISTRATION ADMINISTRATION ADMINISTRATION
COMMUNICATIONS EMPLOYEE ACCOUNTING CUSTOMER& REGIONAL ENVIRONMENTAL PLANNING
DEVELOPMENT) NETWORK COMPLIANCE&
TRAINING SUPPORT ASSETS AND SERVICES MONITORING
SAFETY& PURCHASING& PROGRAMMING FACILITIES ENVIRONMENTAL PROJECT
�1 HEALTH WAREHOUSE &DATABASE MAINTENANCE SCIENCES MAp GI
EMENT
SYSTEMS SERVICES LABORATORY
HUMAN PROCESS PROCESS SOURCE ENGINEERING&
RESOURCES CONTROLS ENGINEERING CONTROL CONSTRUCTION
INTEGRATION
m' PLANT NO.
OPERATIONS
PLANT NO.2
�1 OPERATIONS
MECHANICAL
yy MAINTENANCES
POWER
PRODUCTION
ELECTRICAL&
INSTRUMENTATION
MAINTENANCE
AIR QUALITY&
SPECIAL
PROJECTS
A
ad
ORANGE COUNTY SANITATION DISTRICT
Map of Service Area
As of June 30, 2004
LOS ANGELES COUNTY
LA HABRA
nl•..n�.i EA qR
GO :Y"
YORBA LINDA
FULL TON
„Pc1 c --a,A.. PLACENTIA
CO
p UENJ1 ANAHEIM O
PARF�
5
I, -
CYPRESS- - s
e.r= VILLA
ANAHEIM PARK ~
ILOS iSTANT, ON ORANGE
ALAMITOS.�,
GARDEN GROVE
SEAL BEACH
TERII
M166AY .. 1
CITY e SANTA ANA
TUSTIN
11.—A— ,.
1
FOUNTA VAL Y ir
• :�4� • r
HUNTINGTON , '-
BEAC
COSTA MESA _ 7 r•
Reclamation j 4 IRVINE
Plant No. 1 i
I `
Treatment ^br�r NEWP T BEA
Plant No.2 F
ONtr EA �DITTO
NO �
90 ?
�F •A
�- - Orange County Sanitation District(OCSD) �r
xsoP.ncs.,en Orange County.CA
Rev.1999
XII
Y
rr
mi
Ow
IN
wrf () 4:
Ow
Financial Section
.r-
nancial Section
Fi
1201 DOVE STREET,SUITE 680
[ ,�f f- ' �/ NEWPORT BEACH,CALIFOR141A 92660
oreland C��� "yCC"1� tr!?.�/. (949)221-0025
CERTIFIED PUBLIC ACCOUNTANTS 570 RANCHEROS DRIVE,SUITE 260
SAN MARCOS,CA 92069
(760)752-3390
September 3, 2004
The Honorable Board of Directors
of the Orange County Sanitation District
Independent Auditors' Report
We have audited the accompanying basic financial statements of the Orange County Sanitation District
(District) as of and for the year ended June 30, 2004, as listed in the table of contents. These financial
statements are the responsibility of the District's management. Our responsibility is to express an opinion
on these financial statements based on our audit.
We conducted our audit in accordance with auditing standards generally accepted in the United States of
America, and the standards applicable to financial audits contained in Government Auditing Standards
issued by the Comptroller General of the United States. Those standards require that we plan and
perform the audit to obtain reasonable assurance about whether the financial statements are free of
material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts
and disclosures in the financial statements. An audit also includes assessing the accounting principles
used and significant estimates made by management, as well as evaluating the overall financial
statement presentation. We believe that our audit provides a reasonable basis for our opinion.
In our opinion, the basic financial statements referred to above presently fairly, in all material respects,
the financial position of the District as of June 30, 2004, and the changes in financial position and cash
flows for the year then ended in conformity with accounting principles generally accepted in the United
States of America.
In accordance with Government Auditing Standards, we have also issued a report dated September 3,
2004 on our consideration of the District's internal control over financial reporting and our tests of its
compliance with certain provisions of laws regulations, contracts and grants. That report is an integral part
of an audit performed in accordance with Government Auditing Standards and should be read in
conjunction with this report in considering the results of our audit.
The management's discussion and analysis identified in the accompanying table of contents is not a
required part of the basic financial statements, but is supplementary information required by the
Governmental Accounting Standards Board. We have applied certain, limited procedures, which
consisted principally of inquiries of management regarding the methods of measurement and
presentation of the required supplementary information. However, we did not audit the information and
express no opinion on it.
Our audit was conducted for the purpose of forming an opinion on the basic financial statements of the
District. The introductory section, supplementary information, and statistical section are presented for
purposes of additional analysis and are not a required part of the basic financial statements. The
supplementary information has been subjected to the auditing procedures applied in the audit of the basic
financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic
financial statements taken as a whole. The introductory section and statistical section have not been
subjected to the auditing procedures applied in the audit of the basic financial statements and,
accordingly, we express no opinion on them.
1
L
(THIS PAGE INTENTIONALLY LEFT BLANK)
L
L
L
L
L
L
L
Ll
ON
s+ Management Discussion and Analysis
June 30,2004
This section of the financial statements of the Orange County Sanitation District (District) is
management's narrative overview and analysis of the financial activities of the District for the fiscal year
ended June 30, 2004. The information presented here is to be considered in conjunction with additional
+d information provided within the letter of transmittal located in the Introductory Section of this report.
Financial Highlights
• As of June 30, 2004, the assets of the District exceeded its liabilities by $1,024.1 million (net assets).
Of this amount, $517.3 million (unrestricted net assets) may be used to meet the District's ongoing
�++ obligations to citizens and creditors.
■ The District's total net assets increased $13.8 million, or 1.4 percent over the year.
■ Net Capital Assets, consisting of non-depreciable capital assets and depreciable capital assets net of
accumulated depreciation, increased $105.5 million, or 11.2 percent over the prior year.
■ Net Assets invested in capital assets, net of related debt decreased $160.4 million, or 2.8 percent.
■ Unrestricted Net Assets increased $120.8 million, or 30.5 percent from the prior year.
.r
Overview of the Basic Financial Statements
The District operates as a utility enterprise and presents its financial statements using the economic
resources measurement focus and the full accrual basis of accounting. As an enterprise fund, the
District's basic financial statements comprise two components: financial statements and notes to the
financial statements. This report also contains other supplementary information in addition to the basic
financial statements themselves.
In accordance with Governmental Accounting Standards Board (GASB) Statement No. 34, the District's
financial statements include a statement of net assets, statement of revenues, expenses and changes in
net assets, and a statement of cash flows. The statement of net assets includes all of the District's assets
and liabilities and provides information about the nature and amounts of investments in resources
(assets) and the obligations to District creditors (liabilities). It also provides for the basis for computing
rate of return, evaluating capital structure of the District and assessing the liquidity and financial flexibility
of the District.
The statement of revenues, expenses, and changes in net assets accounts for the current year's
revenues and expenses. This statement measures the success of the District's operations over the past
year and can be used to determine the District's creditworthiness. It also highlights the District's
dependency on property tax revenues in supplementing user fees and other charges for recovering total
costs.
The final required financial statement is the statement of cash flows. The statement reports cash
receipts, cash payments, and net changes in cash resulting from operations and investments during the
reporting period.
Net Assets
As previously stated, net assets increased $13.8 million, or 1.4 percent to $1,024.1 million in FY 2003-04
over the prior year. In comparison, net assets increased $36.4 million, or 3.7 percent, to $1,010.3 million
in FY 2002-03 over FY 2001-02.
r
3
(Dollars in thousands)
Percentage _
June 30, June 30, Increase Increase
2004 2003 (Decrease) (Decrease)
Assets
Current and other assets $ 649,482 $ 465,661 $ 183,821 39.5%
Capital assets, net 1,045,518 940,000 105,518 11.2% i..i
Total assets 1,695,000 1,405,661 289,339 20.6%
Liabilities
Long-term debt outstanding 622,111 353,843 268,268 75.8%
Other liabilities 48,757 41,471 7,286 17.6% _
Total liabilities 670,868 395,314 275,564 69.7%
Net assets:
Investment in capital assets,
net of related debt 418,267 578,647 (160,380) -27.7%
Restricted 88,519 35,182 53,337 151.6% _.
Unrestricted 517,346 396,518 120,828 30.5%
Total net assets $ 1,024,132 $ 1,010,347 $ 13,785 1.4% W
Current and other assets increased $183.8 million, or 39.5 percent, due primarily to the issuance of
$280.0 million in certificates of participation debt (COP) financing issued in August 2003, and is partially
offset by the$105.5 million in capital improvements completed in FY 2003-04.
Capital assets, net increased $105.5 million, or 11.2 percent, due primarily to the continuing capital �I
improvement program that includes construction of 16 new primary clarifiers at Plant No. 1 that will add
96 million gallons per day of primary treatment capacity. In FY 2003-04, $24.8 million of the estimated
$88.6 million construction cost for this project was incurred bringing the total cost-to-date to $68.8 million
with completion expected in FY 2006-07.
Another major project underway is the replacement of the 54-inch diameter trunk sewer on Bushard
Avenue from Plant No. 2 to Ellis Avenue with a 21,500 foot, 108-inch concrete sewer. In FY 2003-04,
$9.5 million of the estimated $40.8 million construction cost for this project was incurred bringing the total
project cost-to-date to$18.6 million with completion expected in FY 2005-06.
The Groundwater Replenishment System (GWRS) is another ongoing construction project. GWRS is a 6W
50150 joint cost sharing effort of the Orange County Sanitation District and the Orange County Water
District that will initially provide 78,400 acre-feet per year of reclaimed water for replenishment of the
Orange County Groundwater Basin and to augment the seawater intrusion barrier at a cost of $503.3
million. The District incurred $16.3 million in construction during FY 2003-04 for this project bringing the
total project cost-to-date to $31.8 million with a projected completion date in FY 2007-08. -
See page 7 for the Schedule of Capital Assets and a listing of the other major capital additions for FY
2003-04.
Net assets invested in capital assets, net of related debt decreased $160.4 million, or 27.7 percent over y,
the prior year is primarily a result of the increase in the net outstanding debt due to the issuance of
$280.0 million in COP to fund future capital improvements that is somewhat offset by the $105.5 million
increase in net capital assets over the prior year and by the $11.6 million in debt service principal
payments.
w
4
w
Changes in Net Assets
Net assets increased $13.8 million in FY 2003-04, a 1.4 percent increase over the prior year's increase.
(Dollars in thousands)
Percentage
June 30, June 30, Increase Increase
2004 2003 (Decrease) (Decrease)
Revenues:
Operating revenues
Service Charges $ 101,995 $ 88,640 $ 13,355 15.1%
Permit and inspection fees 332 524 (192) -36.6%
_ Total operating revenues 102,327 89,164 13,163 14.8%
Non-operating revenues
Property taxes 46,943 44,591 2,352 5.3%
Investment and interest income 6,785 25,889 (19,104) -73.8%
Capital facilitites capacity charges 8,998 10,146 (1,148) -11.3%
Other 928 706 222 31.4%
Total non-operating revenues 63,654 81,332 (17,678) -21.7%
Total revenues 165,981 170,496 (4,515) -2.6%
Expenses:
Operating expense other than
depreciation and amortization 95,403 79,669 15,734 19.7%
Depreciation and amortization 46,118 43,695 2,423 5.5%
Non-operating expense 19,920 13,925 5,995 43.1%
Total expenses 161,441 137,289 24,152 17.6%
Income before capital
contributions 4,540 33,207 (28,667) -86.3%
Capital contributions
' (distributions), net 9,245 3,166 6,079 192.0%
Increase in net assets 13,785 36,373 (22,588) -62.1%
-" Beginning net assets 1,010,347 973,974 36,373 3.7%
Ending net assets $ 1,024,132 $ 1,010,347 $ 13,785 1.40/6
Sources of Revenue Functional Expenses
June 30,2003 June 30,2003
28% °
° 6% 10% 12% ®Collections
®User Fees ■Treatment&
■Taxes Levied 29% Disposal
❑Interest _ ❑Depreciation&
❑Other Amortization
049% ❑Interest
-t
62% Expense
5
L�
As previously stated, an enterprise fund is used to account for the operations of the District, which is w
financed and operated in a manner similar to private business enterprises. This allows the District to
determine that the costs (expenses, including depreciation and amortization) of providing wastewater
management services on a continuing basis are financed or recovered primarily through user charges.
Sewer service user fees are evaluated annually based primarily on budget requirements for total
operation, maintenance and capital expenditures for providing wastewater management services.
Property tax revenues are dedicated for the payment of debt service. i•�+
In FY 2003-04, operating revenues increased $13.2 million, or 14.8 percent over the prior year, reflective
of the $13.4 million, or 15.0 percent increase in service charges. The increase in service charges is
primarily due to 14.29 percent increase in the average sewer user fee rate over the prior year.
The $17.7 million, or 21.7 percent, decline in non-operating revenues includes a $19.1 million, or 73.8
percent decline in investment and interest income and a $1.1 million, or 11.3 percent decline in capital w
facilities capacity charges. These decreases are somewhat offset by a $2.4 million, or 5.3 percent
increase in property tax revenues. The decrease in investment and interest income is attributable to
lower yields earned on investments that are somewhat offset by the higher cash and investment balances .
over the prior year. Cash and investment balances increased in FY 2003-04 from the prior year by
$179.2 million from $427.1 million to $606.3 million, or 42.0 percent, primarily due to debt proceeds
received from the issuance of $280 million of COP. However, yields earned on investments declined
from 5.80 percent to 1.31 percent during this same time period. The $2.4 million increase in property tax
revenues is reflective of the continuing upturn in the real estate market as total assessed valuations have
also increased over the prior year by 6.8 percent. The $1.5 million decline in capital facilities capacity
charges is attributable to the cyclical nature of construction as new construction was relatively flat in
comparison with the prior year.
Of the 19.7 percent increase in operating expense before depreciation and amortization, collection
system operating activities increased 23.8 percent, or$3.1 million, while treatment and disposal operating w
expenses increased by 20.9 percent, or $13.9 million. The increase in collection system operating
activities is primarily attributable to an increase in overhead allocations of $1.2 million, write-off of
obsolete inventory of $1.0 million, and an increase of $0.5 million in salaries and related costs associated
with the District's participation in the Fats, Oil, and Grease Control Program, Odor Control Program and
Urban Runoff Program over the prior year. These programs are designed to regulate the quantity and
quality of the wastewater discharged into the District's sewer system. The increase in treatment and
disposal operating expenses is primarily due to the increase in supplies, repairs, and maintenance of$1.5 L40
million, or 13.5 percent, the increase in contractual services of $1.9 million, or 14.7 percent, and the
increase in salaries and benefits of $9.3 million, or 27.2 percent. Of the $1.5 million increase in supplies, "
repairs, and maintenance, approximately $1.0 of this increase is attributable to the timing of the co- �
generation engine overhauls at the District's two treatment plant facilities. The remaining net increase of
$500,000 is in chemical supplies as disinfection alone increased $900,000. This increase follows the
prior year increase of $5.7 million over FY 2001-02 because of the policy decision made by the District's
Board of Directors to fully disinfect the effluent discharged out the District's ocean outfall. The increase in ►„
contractual services is primarily attributable to the $2.3 million increase in biosolid removal cost based on
the Board of Directors' decision to optimize the existing secondary treatment facilities to achieve the
highest possible treatment standards.
Although salaries and benefits expense increased $9.32 million, or 27.2 percent within the treatment and
disposal activities, the collection activity increase was much less at $660,000, or 14.7 percent. These
total increases of $9.98 million in salary and benefit operating expenses is part of the overall increase in w
the District salaries and benefits of $10.44 million when including salaries and benefits capitalized within
the capital improvement program. Overall, total District salaries and benefits were $57.70 million, a 22.1
percent increase over the prior year total of $47.3 million. This increase is attributable to the addition of
26.7 full time equivalent employees over the prior year that were necessary to support the District's
decision to disinfect the ocean discharge and to optimize the existing secondary treatment facilities to
achieve the highest possible treatment standards.
6
4-0+
V*
aw The 43.1 percent, or $6.0 million increase in non-operating expense is comprised of an increase of $2.8
million, or 21.9 percent in interest expense; an increase of$1.9 million, or 161.2 percent in capital grants
to member agencies; and a $1.3 million, or 5,070.5 percent increase in other non-operating expense.
„a, The $6.0 million increase in interest expense is primarily attributable to the additional interest paid on the
new $280 million COP that were issued one month into the fiscal year. The overall increase was
somewhat offset by the favorable decline in the daily and weekly interest rates on the District's variable
rate certificates of participation debt program that fell from a composite average of 1.17 percent in FY
*" 2002-03 to a composite average of 0.92 percent in FY 2003-04.
A total of $3.1 million in capital grants was provided to member agencies during this past fiscal year for
funding the repair and replacement of local sewers owned and maintained by member agencies in order
to reduce rainfall induced inflow and infiltration into the District's treatment facilities. The District trunk
sewers comprise roughly three percent of the overall length of sewers in the District's service area. The
remaining 97 percent are private and local agency owned smaller diameter sewers and laterals.
The $1.3 million increase in other non-operating expense is attributable to the write-off of fixed assets no
longer in use. Over the past year, the Finance Department made a concerted effort to review recently
,r, completed rehabilitation and replacement capital improvement projects to ensure that the old related
infrastructure was properly accounted for.
The net increase in capital contributions of $6.1 million, or 192.0 percent, is primarily attributable to
capacity rights sold to the Santa Ana Watershed Project Authority.
Capital Assets
At June 30, 2004, the District had a net investment of $1.045 billion in capital assets. This amount
represents a net increase (including additions and deletions) of $105.5 million, or 11.2 percent over the
prior year.
(Dollars in thousands)
sa
Percentage
June 30, June 30, Increase Increase
2004 2003 (Decrease) (Decrease)
Land $ 11,446 $ 10,399 $ 1,047 10.1%
Construction in Progress 359,104 244,214 114,890 47.0%
,.Y Sewage collection facilities 255,755 245,997 9,758 4.0%
Sewage treatment facilities 317,979 333,885 (15,906) 4.8%
Effluent disposal facilities 50,089 52,361 (2,272) 4.3%
Solids disposal facilities 3 4 (1) -25.0%
General and administrative facilities 51,142 53,140 (1,998) -3.8%
Capital assets, net $ 1,045,518 $ 940,000 $ 105,518 11.27
Major capital asset additions for the current fiscal year included the following:
• $24.8 million on the construction of 16 Additional Primary Clarifiers at Plant No. 1
• $16.3 million on the Ground Water Replenishment System
• $14.5 million on the Standby Power and Reliability Modifications
• $14.4 million on the Plant Reinvention/Automation Project
• $13.4 million on the Rehabilitation of the Trickling Filters & Construction of Secondary Clarifiers
• $11.9 million on the Effluent Pump Station Annex
• $ 9.5 million on the Bushard Trunk Sewer Rehabilitation
,.a $ 8.8 million on Area Classification Studies
7
The District's FY 2004-05 capital budget forecasts spending of$231.2 million with a total CIP budget-to-
completion of $2.1 billion. More detailed information about the District's capital assets is provided in
Notes 1 and 3 of Notes to the Financial Statements.
Debt Administration
At June 30, 2004, the District had $633.4 million outstanding in COP, a net increase of$268.4 million, or �+
73.5 percent from the prior year. This increase is due to the issuance of$280 million of new COP fixed
rate debt in August 2003 as reimbursements for capital improvements constructed over the past three
years, and a share of those to be constructed over the next two years. This increase from the debt
issuance was offset by installment payments made on existing COP debt.
The District maintains an Aa3 from Moody's Investor Services, an AA/A-1 from Standard and Poor's
Corporation, and an AA from Fitch. The District's long-range financing plan is designed to maintain these
high ratings. Over the next ten years, the District is projecting an additional $2.1 billion in future treatment
plant and collection system capital improvements. In accordance with the District's long-term debt fiscal
policy, the District will restrict long-term borrowing to capital improvements that cannot be financed from Lao
current revenue.
Although no new debt financing is scheduled for FY 2004-05, a total of$1.1 billion in COP debt issuance
is being proposed over the next ten years with a new issuance scheduled for every other year. These
financings are needed early in the 20-year capital improvement program because the bulk of the
construction is scheduled during the next ten years.
1d
For more detailed information on long-term debt activities, refer to Note 4 of the Notes to Basic Financial
Statements.
w
Economic Factors and Next Year's Budgets and Rates
■ The unemployment rate within the County of Orange is currently 3.6 percent, which is a decrease
from a rate of 4.0 percent a year ago.
■ Inflation for Orange County in FY 2004-05 is projected to be 2.9 percent based on the 2004 projected
percentage change in consumer price index obtained from the December 2003 Economic and
Business Review report prepared by Chapman University.
■ Projected rate of return on investments was increased from the 1.31 percent earnings rate in FY
2003-04 to 4.0 percent for FY 2004-05.
All of these factors were considered in preparing the District's budget for FY 2004-05.
The District user fee schedule was increased by 15.0 percent for FY 2004-05 over the prior year. The fee _
applicable to the District's largest customer base, the single-family residential fee, increased annually
$15.00 from $100.00 to $115.00. These rate increases were necessary to finance the District's cash flow
needs as capital improvement outlays alone will increase 59.3 percent to $231.0 million in FY 2004-05,
and are projected to total $2.1 billion over the next 10 years in order to rehabilitate and upgrade existing
facilities and provide for full secondary treatment standards.
w
Requests for Information
The financial report is designed to provide a general overview of the District's finances. Questions
concerning any of the information provided in this report or requests for additional financial information
should be addressed to the Finance Department, Orange County Sanitation District, P.O. Box 8127,
Fountain Valley, CA 92728-8127.
i�
8
rl
y.+
ari
b
ORANGE COUNTY SANITATION DISTRICT
BASIC FINANCIAL STATEMENTS
low
9
ORANGE COUNTY SANITATION DISTRICT
Statement of Net Assets
June 30, 2004
(With Comparative Data for June 30, 2003)
2004 2003
Current assets:
Cash and cash equivalents $ 101,667,204 $ 7,142,459
Investments 416,653,124 385,300,317
Accounts receivable, net of allowance for uncollectibles 9,465,565 7,646,687
Accrued interest receivable 4,005,023 4,103,715
Due from other governmental agencies 4,182,762 1,635,825
Connection fees receivable 561,697 917,859
Property tax receivable 1,073,114 1,289,484
Inventories 4,338,777 4,882,228 W
Prepaid and other assets 672,228 876,702
Total current assets 542,619,494 413,795,276
Noncurrent assets: b+
Restricted:
Cash and cash equivalents 5,964,807 2,938,113
Investments 81,994,903 31,709,443 6W
Accrued interest receivable 559,270 534,038 _
Unrestricted:
Non-depreciable capital assets 370,549,957 254,612,834 W
Depreciable capital assets, net of accumulated depreciation 674,967,717 685,387,045
Deferred charges 4,106,715 1,843,374
Excess purchase price over book value on acquired assets, net 8,140,238 8,797,947 law
Other assets, net 6,096,856 6,043,422 _
Total noncurrent assets 1,152,380,463 991,866,216
Total assets 1,694,999,957 1,405,661,492
Current liabilities:
Accounts payable 13,914,502 16,029,577
Accrued expenses 6,076,755 5,479,532
Retentions payable 3,343,920 1,428,429
Interest payable 8,855,862 3,073,632
Current portion of long-term obligations 16,565,607 15,459,439
Total current liabilities 48,756,646 41,470,609
Noncurrent liabilities:
Noncurrent portion of long-term obligations 622,111,252 353,843,588
Total liabilities 670,867,898 395,314,197
Net assets:
Invested in capital assets, net of related debt 418,266,586 578,647,534 691
Restricted for debt service 88,518,980 35,181,594
Unrestricted 517,346,493 396,518,167
Total net assets $1,024,132,059 $1,010,347,295 iwd
i.w
See Accompanying Notes to Basic Financial Statements.
10
ON ORANGE COUNTY SANITATION DISTRICT
Statement of Revenues, Expenses, and Changes in Net Assets
For the Year Ended June 30, 2004
(With Comparative Data for the Year Ended June 30, 2003)
„ 2004 2003
Operating revenues:
Service charges $ 101,994,667 $ 88,640,114
Permit and inspection fees 332,329 523,866
Total operating revenues 102,326,996 89,163,980
Operating expenses other than depreciation
and amortization:
Salaries and benefits 48,711,494 38,732,528
Utilities 5,408,223 4,622,254
Supplies, repairs and maintenance 16,954,161 14,383,290
Contractual services 18,498,097 15,958,742
Directors'fees 141,440 139,751
Meetings and training 979,802 999,103
Other 4,710,179 4,833,132
goo Total operating expenses other than
depreciation and amortization 95,403,396 79,668,800
Operating income before depreciation
and amortization 6,923,600 9,495,180
Depreciation and amortization 45,460,338 43,036,601
Amortization of excess purchase price over
book value on acquired assets 657,709 657,709
Operating loss (39,194,447) (34,199,130)
Non-operating revenues:
Property taxes 46,943,327 44,591,496
Investment and interest income 6,785,653 25,888,943
Capital facilities capacity charges 8,997,737 10,145,758
Other 927,906 705,706
Total non-operating revenues 63,654,623 81,331,903
Non-operating expenses:
Interest 15,524,457 12,731,179
Capital grants to member agencies 3,050,918 1,168,254
Other 1,344,842 26,010
ti
Total non-operating expenses 19,920,217 13,925,443
Income before capital contributions 4,539,959 33,207,330
Capital contributions from other agencies 9,244,805 3,166,280
Change in net assets 13,784,764 36,373,610
Total net assets- beginning 1,010,347,295 973,973,685
Total net assets- ending $1,024,132,059 $1,010,347,295
See Accompanying Notes to Basic Financial Statements.
11
ORANGE COUNTY SANITATION DISTRICT
Statement of Cash Flows
For the Year Ended June 30, 2004
(With Comparative Data for the Year Ended June 30, 2003)
2004 2003
Cash flows from operating activities:
Receipts from customers and users $ 100,701,615 $ 93,042,680
Payments to employees (47,971,535) (38,388,953)
Payments to suppliers (45,282,276) (40,025,486)
Net cash provided by operations 7,447,804 14,628,241 NMI
Cash flows from noncapital financing activities:
Capital facilities capacity charges 9,353,899 10,688,100
Proceeds from property taxes 47,159,697 44,368,254
Grants to member agencies (3,050,918) (1,168,254)
Net cash provided by noncapital financing activities 53,462,678 53,888,100
Cash flows from capital and related financing activities:
Additions to property, plant and equipment (149,480,823) (112,913,330)
Disposal of property,plant,and equipment 4,227,802 523,794
Additions to other assets (3,416) (2,231)
Disposal of other assets 3,416 2,231 L,
Interest paid (16,763,529) (11,661,494)
Principal payments on certificates of participation (11,610,000) (11,024,999)
Proceeds from certificates of participation issuance 278,672,948 -
Certificates of participation issuance costs (1,616,176) -
Proceeds from capital contributions 7,432,277 3,012,734
Net cash provided(used)by capital and related financing activities 110,862,499 (132,063,295)
Cash flows from investing activities: ►.a
Proceeds from the sale of investments 2,602.462,257 4,324,857,132
Purchases of investments (2,695,596,858) (4,425,681,766)
Interest received 18,913,059 24,010,931
Net cash used by investing activities (74,221,542) (76,813,703)
Net increase(decrease)in cash and cash equivalents 97,551,439 (140,360,657)
Cash and cash equivalents, beginning of year 10,080,572 150,441,229
Cash and cash equivalents,end of year $ 107,632,011 $ 10,080,572
Reconciliation of operating loss to net cash provided by operating activities:
Operating loss $ (39,194,447) $ (34,199,130) LWJ
Adjustments to reconcile operating loss to net cash provided by operations:
Depreciation and amortization 46,118,047 43,694,310
Other non-operating revenues and expenses 993,334 746,185
(Increase)/decrease in operating assets:
Accounts receivable (1,818,878) 1,565,010
Due from other governmental agencies (734,409) 1,607.984
Inventories 270,296 (99,535)
Prepaid and other assets 204,474 26,725
Increase/(decrease)in operating liabilities:
Accounts payable (2,115,075) 2,070,692
Accrued expenses 597,223 (773,466)
Retentions payable 1,915,491 464,375
Arbitrage payable 235,890 (283.170)
Compensated absences 695,112 220,8B5
Claims and judgments 280,746 (412.624) La✓
Net cash provided by operations $ 7,447,804 $ 14,628,241
Noncash Activities:
Unrealized gain(loss)on the fair value of investments $ (11,496,334) $ 1,375,603
Disposal of assets with no cash effect (1,137,115) (66,489)
Certificates of participation issuance cost-underwriter's fee (829,244) -
Certificates of participation original issue discount (497,808) -
See Accompanying Notes to Basic Financial Statements.
12
IM
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
"r June 30, 2004
bad (1) Summary of Significant Accountinq Policies
Reporting Entity
ow The Orange County Sanitation District(District)is a public agency which owns and operates certain
wastewater facilities in order to provide regional wastewater collection, treatment, and disposal
services to approximately 2.4 million people in the northern and central portion of the County of
Orange, California. The District is managed by an administrative organization comprised of
directors appointed by the agencies and cities which are serviced by the District.
The District's service area was originally formed in 1954 pursuant to the County Sanitation District
Act and consisted of seven independent special districts. Two additional districts were formed and
additional service areas were added in 1985 and 1986. These special districts were jointly
responsible for the treatment and disposal facilities which they each used. In April of 1998, the
Board of Supervisors of Orange County passed Resolution 98-140 approving the consolidation of
the existing nine special districts into a new, single sanitation district. This action was taken in
order to simplify the governance structures, reduce the size of the District's Board of Directors,
ease administrative processes, streamline decision-making and consolidate accounting and
auditing processes. Pursuant to the Resolution and Government Code Section 57500, the
predecessor special districts transferred and assigned all of their powers, rights, duties, obligations,
functions and properties to the District, including all assets, liabilities, and equity.
met Effective July 1, 1998, the organization became known as the Orange County Sanitation District.
The boundaries of one of the previous districts, now known as Revenue Area No. 14, has been
maintained separately because their use of the District's collection, treatment, and disposal system
is funded by the Irvine Ranch Water District. The boundaries of the other eight districts have been
"w consolidated and are collectively referred to as the Consolidated Revenue Area. The District utilizes
joint operating and capital outlay accounts to pay joint treatment, disposal, and construction costs.
These joint costs are allocated to each revenue area based on gallons of sewage flow.
ow
The accompanying financial statements present the District and its blended component unit, the
Orange County Sanitation District Financing Corporation. The Corporation is a legally separate
entity although in substance it is considered to be part of the District's operations. The District is
� considered to be financially accountable for the Corporation which is governed by a board
comprised entirely of the District's board members. There is no requirement for separate financial
statements of the Corporation; consequently, separate financial statements for the Corporation are
No not prepared. The Corporation had no financial activity during the fiscal year ended June 30, 2004,
other than the issuance of certificates of participation and principal and interest payments on
outstanding certificates of participation (see Note 4).
The District is independent of and overlaps other formal political jurisdictions. There are many
governmental entities, including the County of Orange, that operate within the District's jurisdiction;
however, financial information for these entities is not included in the accompanying financial
statements in accordance with the provisions of Governmental Accounting Standards Board
(GASB)Statement 14.
Measurement Focus and Basis of Accounting
�Ww The District operates as an enterprise activity. Enterprise funds account for operations that are
financed and operated in a manner similar to private business enterprises, where the intent of the
Board of Directors is that the costs (expenses, including depreciation and amortization)of providing
Mai services to the general public on a continuing basis be financed or recovered primarily through
user charges.
(Continued)
13
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30, 2004
Basis of accounting refers to when revenues and expenses are recognized in the accounts and
reported in the financial statements. Enterprise funds are accounted for on the flow of economic
resources measurement focus and use the accrual basis of accounting, whereby revenues are
recognized when earned and expenses are recognized when incurred, regardless of the timing of
related cash flows. The District applies all GASB pronouncements currently in effect as well as
Financial Accounting Standards Board Statements and Interpretations, Accounting Principal Board
Opinions and Accounting Research Bulletins of the Committee on Accounting Procedure issued on
or before November 30, 1989, unless those pronouncements conflict with or contradict GASB w
pronouncements.
Operating Plans
W
Each year, District staff prepares an annual operating plan which is adopted by the Board of
Directors. The annual operating plan is used to serve as a basis for monitoring financial progress,
estimating the levy and collection of taxes, and determining future service charge rates. During the
year, these plans may be amended as circumstances or levels of operation dictate.
Cash Equivalents
Investments with original maturities of three months or less are considered to be cash equivalents. W
Investments
All investments are stated at fair value (the value at which a financial instrument could be
exchanged in a current transaction between willing parties, other than in a forced or liquidation
sale). Changes in fair value that occur during the fiscal year are reported as part of investment and
interest income. Investment and interest income includes interest earnings and realized and
unrealized changes in fair value. '
Accounts Receivable
Accounts receivable is shown net of the allowance for uncollectibles which was $88,600 at June low
30, 2004. Any unbilled sewer service receivables are recorded at year-end.
Inventory
Inventory is stated at cost, which approximates market, on a weighted-average basis.
Capital Assets
Outlays for property, plant, equipment, and construction in progress are recorded in the revenue
area which will use the asset. Such outlays may be for individual revenue area assets or for a
revenue area's share of joint assets.
Capital assets of property, plant, and equipment are defined by the District as assets with an initial,
individual cost of more than $1,000 and an estimated useful life of at least three years. Such -
assets are recorded at cost, except for assets acquired by contribution, which are recorded at fair
market value at the time received. Cost includes labor; materials; outside services; vehicle and
equipment usage; allocated indirect charges such as engineering, purchasing, supervision and
other fringe benefits; and certain administrative and general expenses. Net interest costs are
capitalized on projects during the construction period. During the fiscal year ended June 30, 2004, La,
net interest costs of$6.9 million were capitalized.
Depreciation of plant and equipment is provided for over the estimated useful lives of the assets
using the straight-line method. The District generally follows the guidelines of estimated useful
lives as recommended in the State of California Controller's Uniform System of Accounts for
Waste Disposal Districts, which range from 3 to 75 years. The following are estimated useful lives
I.r
(Continued)
14
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30, 2004
for major classes of depreciable assets: Sewage collection facilities—50 years, Sewage treatment
facilities — 40 years, Sewage disposal facilities — 40 years, and General plant and administrative
facilities—11.5 years.
r
Amortization
Amortization of the excess purchase price over the book value of assets acquired is provided using
the straight-line method over an estimated useful life of 30 years.
Discounts and deferred charges on the certificates of participation are amortized to interest
expense over the respective terms of the installment obligations based on their effective interest
.� rates (note 4).
Restricted Assets
Certain assets are classified as restricted because their use is limited by applicable debt
covenants. Specifically, the assets are restricted for installment payments due on certificates of
participation or are maintained by a trustee as a reserve requirement for the certificates of
participation. When both restricted and unrestricted resources are available for use, it is the
«�+ District's policy to use restricted resources first, then unrestricted resources as they are needed.
Compensated Absences
The District's employees, other than operations and maintenance personnel, are granted vacation
and sick leave in varying amounts with maximum accumulations of 200 hours and 560 hours for
vacation and sick days earned but unused, respectively. Operations and maintenance personnel
accrue "Personal Leave" at a rate of between 60 and 200 hours per year depending on years of
service. Personal leave can be accumulated up to a maximum of 400 hours.
Vacation and sick leave benefits and personal days are recorded as an expense and liability when
earned by eligible employees. In determining the estimated sick leave liability at June 30 of each
year, the District assumes that all employee's accumulated sick leave balances will ultimately be
paid out at 35 percent of the ending balance. The distribution between current and long-term
portions of the liability are based on historical trends.
Claims and Judgments
The District records estimated losses, net of any insurance coverage under its self-insurance
program when it is probable that a claim liability has been incurred and when the amount of the
loss can be reasonably estimated. Claims payable includes an estimate for incurred but
unreported claims. The distribution between current and long-term portions of the liability are
based on historical trends.
r
Property Taxes
The County is permitted by State law (Proposition 13) to levy taxes at 1% of full market value (at
time of purchase) and can increase the assessed value no more than two percent per year. The
District receives a share of this basic levy, proportionate to what was received in the 1976 to 1978
period.
law Property taxes attach as an enforceable lien on property as of January 1. Taxes are levied on July
1 and are payable in two installments which become delinquent after December 10 and April 10.
The County bills and collects the property taxes and remits them to the District in installments
during the year. Property tax revenues are recognized when levied to the extent that they are
available to finance current operations. The Board of Directors has designated property tax
revenue to be used for the annual debt service requirements prior to being used as funding for
current operations.
(Continued)
15
►.r
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30,2004
Capital Facilities Capacity Charges W-d
Capital facilities capacity charges represent fees received from developers and residents to join
new or to extend existing trunk sewer systems in excess of the cost to connect. These fees may
be used for operating or capital purposes. tn►
Capital Contributions
Capital contributions consist of charges to certain special districts and agencies for their agreed- 6,�
upon share of additions to capital assets.
Operating and Non-operating Revenues and Expenses
Operating revenues and expenses result from collecting, treating, and disposing of wastewater and
inspection and permitting services. The District's operating revenues consist of charges to
customers for the services provided. Operating expenses include the cost of providing these
services, administrative expenses, and depreciation and amortization expenses. All revenues and lad
expenses not meeting these definitions and which are not capital in nature are reported as non-
operating revenues and expenses.
Self-Insurance Plans 6"r
For the year ended June 30, 2004, the District was self-insured for portions of workers'
compensation, property damage, and general liability. The self-insurance portion of workers'
compensation is $500,000 per person per occurrence with outside excess insurance coverage to
$50 million. The self-insured portion for property damage covering fire and other perils is $25,000
per occurrence with outside excess insurance coverage to $750 million. The self-insured portion
for property damage covering flood is $100,000 per occurrence with outside excess insurance w
coverage to $300 million. The District is self-insured for all property damage from the perils of
earthquakes. The District also maintains outside comprehensive boiler and machinery insurance
with a $100 million per occurrence combined limit with deductibles ranging from $25,000 to
$100,000. The District is substantially self-insured for general liability coverage with a $250,000 he"`
self-insured deductible, but has excess general liability coverage to$25 million per occurrence.
There were no significant changes in insurance coverage during the fiscal year ended June 30, ,
2004 except for (1) the self-insurance portion of general liability was $100,000 per occurrence at
June 30, 2003 and (2) the outside excess insurance coverage of workers' compensation was $25
million at June 30, 2003.
w
During the past three fiscal years there have been no settlements in excess of covered amounts.
Claims against the District are processed by outside insurance administrators. These claims are
charged to claims expense based on amounts which will ultimately be paid. Claims incurred but
not yet reported have been considered in determining the accrual for loss contingencies. District
management believes that there are no unrecorded claims as of June 30, 2004 that would
materially affect the financial position of the District.
Deferred Compensation Plan
The District offers its employees a deferred compensation plan established in accordance with
Internal Revenue Code Section 457. The plan permits all employees of the District to defer a
portion of their salary until future years. The amount deferred is not available to employees until
termination, retirement, death or for unforeseeable emergency. The assets of the plan are held in
trust for the exclusive benefit of the participants and their beneficiaries. Since the plan assets are
administered by an outside party and are not subject to the claims of the District's general creditors,
in accordance with GASB Statement 32, the plan's assets and liabilities are not included within the
District's financial statements.
(Continued)
16
Wo
ORANGE COUNTY SANITATION DISTRICT
�wd Notes to Basic Financial Statements
June 30,2004
'asi (2) Cash and Investments
The District follows the practice of pooling cash and investments of all funds except for cash held
by fiscal agents. Interest income earned on pooled cash and investments is allocated to the
�-+ various funds based on month-end cash and investment balances. Interest income from cash and
investments of funds excluded from pooled cash and investments is recorded directly to the related
fund.
`~ Deposits
Deposits in banks are maintained in financial institutions which provide deposit protection on the
bank balance from the Federal Depository Insurance Corporation. The California Government
"~ Code requires California banks and savings and loans to secure local government deposits by
pledging government securities equal to 110% of the deposits or by pledging first trust deed
mortgage notes equal to 150%of the deposits.
a.i
Deposits are categorized as follows, in accordance with Governmental Accounting Standards
Board (GASB) Statement No. 3, to give an indication of the level of credit risk assumed by the
District at year-end.
.r
Category 1- Insured or collateralized with securities held by the District or by its agent in the
District's name.
Category 2- Collateralized with securities held by the financial institution's trust department or
agent in the District's name.
Category 3- Uncollateralized or collateralized but the pledged securities are not held in the
District's name.
Investments
Statutes authorize the District to invest in obligations of the U.S. Government, state and local
governmental agencies, negotiable certificates of deposit, bankers acceptances, commercial
paper, reverse repurchase agreements, and a variety of other investment instruments which are
allowable under the California Government Code section 53600 et seq.
Investments are categorized as follows, in accordance with GASB Statement No. 3, to give an
indication of the level of credit risk assumed by the District at year-end.
Category 1- Insured or registered, or securities held by the District or its agent in the District's
name.
Category 2- Uninsured and unregistered, with securities held by the purchasing financial
institution's trust department or agent in the District's name.
Category 3- Uninsured and unregistered, with securities held by the purchasing financial
y institution's trust department or agent but not in the District's name.
Investments Not Subject to Categorization
Investments in the California Local Agency Investment Fund (LAIF) are not categorized as GASB
Statement No. 3 does not require categorization of investment pools managed by another
government. Also, cash held by trustees is not categorized because the underlying assets of the
funds are invested within open-ended mutual funds. Decisions regarding these investments are
made by fiscal agents for the District who are acting in accordance with agreements entered into
with the District. All such investments are not required to be categorized under interpretive
guidelines issued by the GASB.
.r
(Continued)
17
law
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30, 2004
The District is a voluntary participant in the Local Agency Investment Fund (LAIF) that is regulated '
by California Government Code Section 16429 under the oversight of the Treasurer of the State of
California. The fair value of the District's investment in this pool is reported in the accompanying
financial statements at amounts based upon the District's pro-rata share of the fair value provided
by LAIF for the entire LAIF portfolio (in relation to the amortized cost of that portfolio). The balance
available for withdrawal is based on the accounting records maintained by LAIF, which are
recorded on an amortized cost basis. The management of LAIF has indicated to the District that as
of June 30, 2004 the amortized cost of the pool was $57,630,116,554 and the fair value of the pool
was $57,536,996,461. Included in LAIF's investment portfolio are collateralized mortgage
obligations, mortgage-backed securities, other asset-backed securities, and floating rate securities
issued by federal agencies, government-sponsored enterprises, and corporations.
A summary of deposits and investments as of June 30, 2004, is categorized as follows:
June 30,2004
Carrying Amount Bank
Deposits: Unrestricted Restricted Balance Category
Demand cash accounts $ (8,472,632) $ - $ 1,308,811 2
Bank investment contracts:
-with JPMorgan Bank - 4,250,000 4,250,000 3
-with US Bank - 29,728,427 29,728,427 3
Total Deposits (8,472,632) 33,978,427 $ 35,287,238
Investments:
Cash and investments with LAIF 29,860,436 - N/A
U.S.government securities 432,808,635 - 1
Commercial paper 2,989,360 - 1
Corporate bonds/notes 50,627,579 - 1
Mutual funds 10,506,950 - N/A e.+
Investments held with fiscal agents:
-U.S.government securities - 53,014,776 3
-mutual funds - 966,507 N/A
Total Investments 526,792,960 53,981,283
ISO
Total Carrying Amount $ 518,320,328 $ 87,959,710
Cash and cash equivalents and w+
investments as reported on the
statement of net assets:
Cash and cash equivalents $ 101,667,204 $ 5,964,807
Investments 416,653,124 81,994,903
$ 518,320,328 $ 87,959,710 -
Although the bank investment contract with US Bank is classified as category 3, the depositor, AIG
Matched Funding Corporation, is required to pledge collateral in an amount equal to 103% of the
amount of the investment contract if the long-term, unsecured, unsubordinated debt securities of
AIG fall below a S&P rating of"AA-" or below a Moody's rating of"Aa3".
At June 30, 2004, the U.S. Government Securities investments included mortgage-backed
securities totaling $167,817,885, and the U.S. Government Securities and Corporate Bond
investments included floating-rate notes totaling$19,780,392.
(Continued)
18
rrr
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30, 2004
too (3) Capital Assets
Capital asset activity for the year ended June 30, 2004 is as follows:
..
Balance at Balance at
June 30,2003 Additions Deletions June 30,2004
Capital assets not depreciated:
No Cost:
Land $ 10,398,595 $ 1,059,359 $ (11,867) $ 11.446,087
Construction in progress 244,214,239 149,458,782 (34,569,151) 359,103,870
am Total nondepreciable assets 254,612,834 150,518,141 (34,581,018) 370,549,957
Depreciable capital assets:
Cost:
"d Sewage collection facilities 396,426,189 29,417,670 (413,479) 425,430,380
Sewage treatment facilities 650,908,862 12,782,068 (5,749,282) 657,941,648
Effluent disposal facilities 87,110,617 317,068 (317,068) 87,110,617
,o Solids disposal facilities 3,051,243 10,984 (10,984) 3,051,243
General and administrative facilities 124,120,780 5,844,355 (4,163,234) 125.801,901
Subtotal 1,261,617,691 48,372,145 (10,654,047) 1,299,335,789
W+ Accumulated depreciation:
Sewage collection facilities (150,429,275) (19,540,903) 294,554 (169,675,624)
Sewage treatment facilities (317,024.013) (26,015,815) 3,077,082 (339,962,746)
Effluent disposal facilities (34,749,385) (2,410,465) 138,356 (37,021,494)
Solids disposal facilities (3,047,456) (12.504) 11,424 (3,048,536)
General and administrative facilities (70,980,517) (7,472,379) 3,793,224 (74,659,672)
Subtotal (576,230,646) (55,452,066) 7,314,640 (624,368,072)
�e
Net depreciable assets 685,387,045 (7,079,921) (3,339,407) 674,967,717
Net capital assets $ 939,999,879 $ 143,438,220 $ (37,920,425) $ 1,045,517,674
(4) Lon4-Term Liabilities
-
The following is a summary of the changes in long-term liabilities for the year ended June 30, 2004:
Certificates
Arbitrage Compensated Claims and of
Payable Absences Judgments Participation Totals
Balance,July 1 $ 760,720 $ 4,025,585 $ 1,321,003 $ 364,975,000 $ 371,082,308
Additions 235,890 4,748,869 887,496 280,000,000 285,872,255
Deletions - 4,053,757 606,750 11,610,000 16,270,507
Balance,June 30 996,610 4,720,697 1,601,749 633,365,000 640,684,056
Due within one year - 4,053,757 471,850 12,040,000 16,565,607
Unamortized discount - - - 849,413 849,413
Unamortized deferred
amount on refundings - - - 1,157,784 1,157,784
Long-term amount $ 996,610 $ 666,940 $ 1,129,899 $ 619,317,803 $ 622,111,252
..
(Continued)
19
WW
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30,2004
Arbitrage Payable td
The Tax Reform Act of 1986 (the Act) requires the District to calculate and remit rebatable
arbitrage earnings to the Internal Revenue Service. Certain of the District's debt and interest
earnings on the proceeds thereof are subject to the requirements of the Act. The District's liability +"�
at June 30, 2004 is $996,610 for future years' remittances.
Compensated Absences Lei
The District's policies related to compensated absences are described in Note 1. The District's
liability at June 30, 2004 is $4,720,697 with an estimated $4,053,757 to be paid or used within the
next fiscal year.
Claims and Judgments Payable
The District is self-insured in a number of areas as described in Note 1. The following is a
summary of the claims and judgments payable as of June 30, 2004 and 2003:
2003-04 2002-03
Claims and judgments payable at July 1 $1,321,003 $1,733,627
Claims incurred during the fiscal year 887,496 63,866
Payments on claims during the fiscal year (606,750) (476,490)
Claims and judgments payable at June 30 1,601,749 1,321,003
Less: current portion (471,850) (476,490)
Total long-term claims and judgments payable $1,129,899 $ 844,513
Certificates of Participation
The District issues certificates of participation in order to finance construction of the treatment
facilities. Each certificate of participation represents a direct and proportionate interest in the semi-
annual interest payments. Installment payments for the issues are payable from any source of
lawfully available funds of the District. Certificates of participation at June 30, 2004 are summarized
as follows:
Amount
W
1992 refunding certificates of participation $ 106,965,000
1993 refunding certificates of participation 42,500,000
2000 refunding certificates of participation 203,900,000
2003 certificates of participation 280,000,000
Total certificates of participation payable $ 633,365,000
Refunded Certificates of Participation
1986 Certificates of Participation
On August 13, 1986, District Numbers 1, 2 and 3 completed the sale of $117,000,000 of
certificates of participation. In December 1992, the entire remaining principal balance of the
certificates was refunded with a portion of the proceeds of the December 1992 refunding
certificates of participation (see below) in a transaction accounted for as an in-substance
defeasance. The remaining outstanding certificates were called in full on August 1, 1996.
(Continued)
20
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30, 2004
1990-1992 Series A Certificates of Participation
On December 5, 1990, all Districts completed the sale of $100,000,000 of certificates of
participation. On August 31, 2000, refunding certificates of participation were issued, and a
portion of the proceeds (see below) was used to currently refund the remaining principal
balance, at no call premium, of the 1990-92 Series A certificates on the call date of October 6,
2000.
1990-1992 Series B Certificates of Participation
On May 1, 1991, District Numbers 1, 2, 3, 5, 6, 7 and 11 completed the sale of $117,555,000
of certificates of participation. This Series was refunded as follows:
• On December 3,1992, $38,350,000 of the outstanding principal balance of the certificates
was refunded with a portion of the proceeds of the December 1992 refunding certificates of
"d participation (see below) in a transaction accounted for as an in-substance defeasance.
• On September 1, 1993, $39,740,000 of the outstanding principal balance of the certificates
was refunded from the proceeds of the September 1993 refunding certificates of
participation (see below)in a transaction accounted for as an in-substance defeasance.
• On August 31, 2000, the remaining outstanding principal balance of $15,395,000 was
refunded from the proceeds of the August 2000 refunding certificates of participation (see
below) in a transaction accounted for as an in-substance defeasance.
• All outstanding certificates were called in full with a two percent premium on August 1,
s 2001.
1990-1992 Series C Certificates of Participation
On September 1, 1992, District Numbers 1, 2, 3, 6, 7 and 11 completed the sale of
$98,500,000 of certificates of participation. On August 31, 2000, refunding certificates of
participation were issued, and a portion of the proceeds (see below) was used to currently
YAW refund the remaining principal balance, at no call premium, of the 1990-92 Series C certificates
on the call date of October 6, 2000.
Outstandinq Certificates of Participation
Wo
December 1992 Refunding Certificates of Participation
On December 3, 1992, the District completed the sale of$160,600,000 of refunding certificates
bow of participation. The certificates were issued to refund the remaining outstanding principal
balance of the 1986 certificates of participation and $38,350,000 of the outstanding principal
balance of the 1990-92 Series B certificates of participation (see above).
The interest rate on the refunding certificates is adjusted by the remarketing agent daily based
on market interest rates. The weighted average interest rate for the fiscal year ended June 30,
2004 was 0.98 percent. On October 1, 1992, the District and a brokerage company entered
�.+ into an interest rate exchange swap agreement (Note 5). Annual principal payments are due
on August 1, beginning August 1, 1993.
The trust agreement for the certificates requires the establishment of a reserve which was
funded from certificate proceeds. The June 30, 2004 reserve of $12,417,008 is held by the
trustee, US Bank, and meets the reserve requirement. Additionally, AMBAC provides municipal
bond insurance for the certificates.
(Continued)
21
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30,2004
September 1993 Refunding Certificates of Participation +
On September 2, 1993, the District completed the sale of$46,000,000 of refunding certificates
of participation. The certificates were issued to refund $39,740,000 of the outstanding principal
balance of the 1990-92 Series B certificates of participation (see above).
The interest rate on the refunding certificates is adjusted by the remarketing agent daily based
on market interest rates. The weighted average interest rate for the fiscal year ended June 30, j
2004,was 0.92 percent. On September 1, 1993, the District and a brokerage company entered
into an interest rate exchange swap agreement(Note 5). Annual principal payments are due on
August 1, beginning August 1, 1995.
The trust agreement for the certificates requires the establishment of a reserve which was
funded from certificate proceeds. The June 30, 2004 reserve of $4,653,381 is held by the
trustee, JPMorgan, and meets the reserve requirement. ,
August 2000 Refunding Certificates of Participation
On August 31, 2000, the District completed the sale of$218,600,000 of refunding certificates 6mi
of participation. The certificates were issued to refund the remaining outstanding principal
balance of the 1990-92 Series A, B, and C certificates of participation (see above) and to
reimburse the District for improvements made to the wastewater system.
The interest rate on the refunding certificates is adjusted by the remarketing agent daily based
on market interest rates. The weighted average interest rate for the fiscal year ended June 30,
2004 was 0.92 percent. Annual principal payments are due on August 1, beginning August 1, 6-d
2001.
The trust agreement for the certificates requires the establishment of a reserve which was iw�
funded from certificate proceeds. The June 30, 2004 reserve of $17,311,428 is held by US
Bank, the trustee, and meets the reserve requirement.
August 2003 Certificates of Participation
On August 26, 2003, the District completed the sale of $280,000,000 of certificates of
participation. The certificates were issued to finance and to reimburse the District for the
acquisition, construction, and installation of additional improvements made to the wastewater w
system. The interest rate on the certificates is fixed and ranges from 5.00 percent to 5.25
percent. Annual principal payments are due on February 1, beginning February 1,2021.
The trust agreement for the certificates requires the establishment of a reserve which was
funded from certificate proceeds. The June 30, 2004 reserve of$27,058,873 is held by Union
Bank, the trustee, and meets the reserve requirement.
i.r
Annual Amortization Requirements
The annual requirements to amortize all debt related to certificates of participation as of June 30,
2004, are as follows: ►.d
(Continued)
22
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30, 2004
Estimated
Year Interest Rate
Ending Estimated Swaps, Net
r. June 30, Principal Interest (See Note 5) Total
2005 $ 12,040,000 $ 17,801,632 $ 6,008,859 $ 35,850,491
2006 12,755,000 17,668,175 5,533,140 35,956,315
2007 13,465,000 17,527,240 5,015,920 36,008,160
2008 14,265,000 17,377,952 4,465,544 36,108,496
2009 15,060,000 17,219,295 3,833,862 36,113,157
2010-2014 102,780,000 83,195,635 10,581,737 196,557,372
2015-2019 115,100,000 77,223,444 1,019,333 193,342,777
2020-2024 107,440,000 68,115,922 - 175,555,922
2025-2029 105,130,000 47,040,527 - 152,170,527
2030-2033 135,330,000 16,214,712 - 151,544,712
Total $633,365,000 $ 379,384,534 $36,458,395 $ 1,049,207,929
(5) Interest Rate Swaps on Certificates of Participation
As indicated in Note 4, the District has entered into interest rate swap agreements in connection
with the 1992 and the 1993 Refunding Certificates of Participation.
Objective: The objective of the interest rate swaps is to lower the District's borrowing costs when
compared against fixed-rate bonds at the time of issuance. The swaps effectively change the
District's variable interest rate to a synthetic fixed rate of 5.55 percent on the 1992 Refunding
Certificates of Participation and to a synthetic fixed rate of 4.56 percent on the 1993 Refunding
Certificates of Participation.
1992 Refunding Certificates of Participation
Terms of the Swap: On October 1, 1992, the District and a brokerage company entered into an
interest rate exchange swap agreement pursuant to which the District will pay a fixed interest rate
of 5.55 percent. The District will receive a variable interest rate equal to the interest paid to the
holders of the certificates which is based on a tax exempt daily interest rate as determined by the
remarketing agent on an initial notional amount of $160,600,000. The notional value of the swap
declines in tandem with the principal amount of the associated debt. This interest rate swap
agreement is accounted for as a hedge, and the associated interest rate differential to be paid or
received is charged to interest expense as interest rates change. The 20-year swap agreement
matures on August 1, 2013.
Fair Value: Because interest rates have declined since execution of the swap agreement, the
swap had an estimated negative fair value of $11.96 million as of June 30, 2004. Because the
variable-rate certificates adjust to changing interest rates, the certificates do not have a
corresponding fair value increase. The fair value was estimated using the zero-coupon method.
This method calculates the future net settlement payments required by the swap, assuming that
the current forward rates implied by the yield curve correctly anticipate future spot interest rates.
These payments are then discounted using the spot rates implied by the current yield curve for
hypothetical zero-coupon bonds due on the date of each future net settlement on the swap.
Credit Risk: As of June 30, 2004, the District was not exposed to credit risk because the swap had
a negative fair value. However, should interest rates change, and the fair value of the swap
become positive, the District would be exposed to credit risk in the amount of the swap's fair value.
(Continued)
23
i.e
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements V
June 30, 2004
The swap's counterparty, AIG Financial Products Corporation, was rated AAA by Standard & 6d
Poor's and Aaa by Moody's Investors Service as of June 30, 2004. To mitigate the potential for
credit risk, if the counterparty's credit quality falls below AA- by Standard & Poor's or Aa3 by
Moody's Investors Service, the fair value of the swap (if the swap has a positive fair value) will be
collateralized by the counterparty as follows: 1) with bonds, debentures and other debt issued or
guaranteed by the United States of America equaling 106 percent of the fair value, or 2) with
securities issued by the Federal Home Loan Mortgage Corporation or the Federal National
Mortgage Association equaling 108 percent of the fair value, or 3) other securities to be agreed
upon and in an amount to be agreed upon by the District, the counterparty, and the Swap Insurer.
The collateral would be held by a third-party custodian.
Basis Risk. The swap does not expose the District to basis risk because the variable-rate interest law
paid to the certificate holders is equal to the variable-rate interest earned on the notional amount of
the swap.
Wid
Termination Risk: The District or the counterparty may terminate the swap if the other party fails to
perform under the terms of the contract. In the event of termination due to default, the defaulting
party will pay to the non-defaulting party the excess (if any) of the sum of the settlement amount
and the unpaid amounts owed less the unpaid amounts due from the non-defaulting party. The
swap may be terminated by the District if the counterparty's credit quality rating falls below AA- by
Standard & Poor's or Aa3 by Moody's Investors Service. If the swap is terminated, the variable-
rate certificates of participation would no longer carry a synthetic interest rate.
1993 Refunding Certificates of Participation
Terms of the Swap: On September 1, 1993, the District and a brokerage company entered into an
interest rate exchange swap agreement pursuant to which the District will pay a fixed interest rate
of 4.56 percent. The District will receive a variable interest rate equal to the interest paid to the
holders of the certificates which is based on a tax exempt daily interest rate as determined by the
remarketing agent on an initial notional amount of $46,000,000. The notional value of the swap ►W
declines in tandem with the principal amount of the associated debt. This interest rate swap
agreement is accounted for as a hedge, and the associated interest rate differential to be paid or
received is charged to interest expense as interest rates change. The 22-year swap agreement
matures on August 1, 2016.
Fair Value: Because interest rates have declined since execution of the swap agreement, the
swap had an estimated negative fair value of $2.28 million as of June 30, 2004. Because the u
variable-rate certificates adjust to changing interest rates, the certificates do not have a
corresponding fair value increase. The fair value was estimated using the zero-coupon method.
This method calculates the future net settlement payments required by the swap, assuming that
the current forward rates implied by the yield curve correctly anticipate future spot interest rates.
These payments are then discounted using the spot rates implied by the current yield curve for
hypothetical zero-coupon bonds due on the date of each future net settlement on the swap.
haul
Credit Risk: As of June 30, 2004, the District was not exposed to credit risk because the swap had
a negative fair value. However, should interest rates change, and the fair value of the swap
become positive, the District would be exposed to credit risk in the amount of the swap's fair value.
The swap's counterparty, Societe Generale Bank, was rated AA- by Standard & Poor's and Aa3 by 6o+
Moody's Investors Service as of June 30, 2004. To mitigate the potential for credit risk, if the
counterparty's credit quality falls below AA- by Standard & Poor's or Aa3 by Moody's Investors
Service, the fair value of the swap (if the swap has a positive fair value)will be collateralized by the
counterparty as follows: 1)with securities issued or guaranteed by the United States Government
equaling 106 percent of the fair value, or 2) with securities issued by the Federal Home Loan
Mortgage Corporation, the Federal National Mortgage Association, or the Government National
(Continued)
24
rr
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30, 2004
"' Mortgage Association equaling 108 percent of the fair value, or 3) other securities to be agreed
upon and in an amount to be agreed upon by the District, the counterparty, and the Swap Insurer.
The collateral would be held by a third-party custodian.
no
Basis Risk: The swap does not expose the District to basis risk because the variable-rate interest
paid to the certificate holders is equal to the variable-rate interest earned on the notional amount of
the swap.
Termination Risk., The District or the counterparty may terminate the swap if the other party fails to
perform under the terms of the contract. In the event of termination due to default, the defaulting
party will pay to the non-defaulting party the excess (if any) of the sum of the settlement amount
and the unpaid amounts owed less the unpaid amounts due from the non-defaulting party. The
swap may be terminated by the District if the counterparty's credit quality rating falls below AA-by
Standard & Poor's or Aa3 by Moody's Investors Service. If the swap is terminated, the variable-
rate certificates of participation would no longer carry a synthetic interest rate.
(6) Net Assets
The difference between assets and liabilities is reported as net assets. Net assets are classified as
restricted, unrestricted, or invested in capital assets, net of related debt. Net assets at June 30,
2004 consisted of the following:
June 30, 2004
Invested in capital assets, net of related debt:
Capital assets, net of accumulated depreciation $ 1,045,517,674
Outstanding debt issued to acquire capital
assets, net of unamortized bond discount
and deferred amount on refundings (631,357,803)
Unamortized deferred charges of debt issued
to acquire capital assets 4,106,715
Subtotal 418,266,586
Restricted by debt covenants for debt service on
certificates of participation 88,518,980
Unrestricted 517,346,493
$ 1,024,132,059
(7) Pension Plan
The District participates in the Orange County Employee's Retirement System (OCERS), a
cost-sharing multiple-employer, defined benefit pension plan which is governed and administered
,.., by a nine member Board of Retirement. OCERS was established in 1945 under the provisions of
the County Employees Retirement Law of 1937, and provides members with retirement, death,
disability, and cost-of-living benefits. OCERS issues a stand-alone comprehensive annual financial
report which can be obtained from OCERS at 2223 Wellington Avenue, Santa Ana, California
92701.
Benefits
�+ All District full-time employees participate in OCERS. Employees who retire at or after age 50 with
ten or more years of service are entitled to an annual retirement allowance. The amount of the
retirement allowance is based upon the member's age at retirement, the member's "final compen-
..a
(Continued)
25
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30,2004
sation" as defined in Section 31462 of the Retirement Law of 1937, the total years of service under W
OCERS, and the employees' classification as a Tier I or Tier II member. Benefits fully vest on
reaching five years of service. OCERS also provides death and disability benefits.
Contributions
As a condition of participation under the provisions of the County Employees Retirement Law of
1937, members are required to contribute a percentage of their annual compensation to OCERS.
Tier I and Tier II covered employees are required to contribute 3.94%- 7.72%and 5.44%- 10.65%,
respectively, of their annual compensation to OCERS. The District is required to make periodic
contributions to OCERS in amounts that are estimated to remain a constant percentage of covered
employees' compensation such that, when combined with covered employees' contributions, will
fully provide for all covered employees' benefits by the time they retire. For the fiscal years ended
June 30, 2004, 2003, and 2002, the required contribution equaled the contribution actually made.
The following table provides salary and contributions requirements for the current and two prior 6e+
fiscal years.
For the Fiscal Year Ending
June 30, 2004 June 30,2003 June 30,2002 601
Total Payroll Costs $ 45,738,510 $ 38,514,484 $ 36,387,839
Payroll Costs of Employees Covered by OCERS 40,094,512 35,341,483 32,391,018
Contributions Requirements:
Contributed by Employees 1,092,292 1,072,477 1,030,924
Contributed by the District on Behalf of Employees 1,777,201 1,549,829 1,457,596
Total Employee Required Contribution 2,869,493 2,622,306 2,488,520
District Required Contribution 3,668,650 1,943,056 765,459
Total Contribution $ 6,538,143 $ 4,565,362 $ 3,253,979
Employee Required Contribution as a Percent of
Covered Payroll 7.16% 7.42% 7.68%
District Required Contribution as a Percent of 6W
Covered Payroll 9.15% 5.50% 2.36%
Total Contribution as a Percent of all Participating
Entities'Contributions 3.79% 4.11% 4.03%
(8)Transactions with Irvine Ranch Water District
Revenue Area No. 14
Revenue Area No. 14 was formed as a result of a negotiated Agreement between the District and
Irvine Ranch Water District (IRWD) as of July 1, 1985. Pursuant to the Agreement, IRWD paid the
District$34,532,000 for an initial 15,000,000 gallons per day capacity in the District's joint treatment
facilities (with an ultimate collection capacity of 32,000,000 gallons per day), together with a
pro-rata interest in real property based on flow of 32,000,000 gallons per day.The book value of the bull
assets purchased by IRWD was determined to be $14,553,000 as of June 30, 1986. The excess of
the purchase price over the assets' book value of$19,979,000 at June 30, 1986 is being amortized
over the remaining 30-year useful lives of the joint assets of Revenue Area No. 14. As of June 30,
2004, $11,838,762 of the excess of purchase price over the assets'book value was amortized.
(Continued)
26
ORANGE COUNTY SANITATION DISTRICT
Notes to Basic Financial Statements
June 30, 2004
IRWD entered into a separate agreement with Revenue Area No. 14 whereby IRWD agreed to
annually fund payment of Revenue Area No. 14's proportionate share of the District's joint capital
outlay revolving fund budget requirements and certain capital improvements during the term of the
agreement, which contribution amounted to$3,992,790 in 2004.
(9)Commitments
dr Groundwater Replenishment System: In March 2001, the District entered into an agreement with
the Orange County Water District, California, to design and construct Phase 1 of the"Groundwater
Replenishment System" (GWRS). The cost of this project is to be paid equally (50 percent shares)
by each agency. The GWRS is a joint effort by the two agencies to provide reclaimed water for
replenishment of the Orange County Groundwater Basin and to augment the seawater intrusion
barrier. The GWRS is planned for three phases, Phase 1 will produce approximately 72,000 acre-
feet per year of recycled water by August 2007, Phase 2 will increase the total capacity to 112,000
acre-feet by the year 2010, and Phase 3 will increase the total capacity to 145,600 acre-feet per
year by the year 2020. Following the completion of Phase 1, the GWRS will have the capacity to
divert up to 100 million gallons per day of flow from the District's ocean discharge.
As of June 30, 2004, the total estimated cost of GWRS Phase 1 was $489.62 million. Of this
amount, up to $92.50 million may be reimbursed through grants from the U.S. Environmental
Protection Agency, the U.S. Bureau of Reclamation,the State Water Resources Control Board, and
others. The District's estimated gross and net share is $244.81 million and $198.56 million,
respectively. Costs incurred by the District through June 30, 2004 total $31.76 million.
Secondary Treatment: On July 17, 2002, the Board of Directors Approved Resolution No. OCSD-
's' 14, "Establishing the Policy for Level of Treatment of Wastewater Discharged into the Ocean". This
resolution established the District's policy to treat all wastewater discharges into the ocean to
secondary treatment standards thereby providing for continued public safety, marine ecosystem
protection, and water reclamation opportunities. To implement this policy, District staff was
directed to immediately proceed with the planning, design, and implementation of treatment
methods that will allow the agency to meet Federal Clean Water Act secondary treatment
standards.
The District estimates that it will take approximately eleven years and additional capital
improvement costs of $271 million to reach secondary treatment discharge standards. Secondary
treatment discharge standards are scheduled to be reached in 2013. In the interim, the District will
operate the plants to maximize available secondary treatment and to reduce effluent biochemical
oxygen demand and suspended solid discharges below currently allowed limits. Each year the
current 50 percent secondary portion will increase incrementally as operations change and new
4" facilities are constructed and placed in service over the next eleven years.
rr
27
Ih
W
W
W
l�1
�eJ
W
W
(THIS PAGE INTENTIONALLY LEFT BLANK)
L
�i
41
I
28
wo
a�
.r
.d
ORANGE COUNTY SANITATION DISTRICT
SUPPLEMENTARY INFORMATION
e.d
Now
tm!
mi
ww
ar
kw
too
29
ww
ORANGE COUNTY SANITATION DISTRICT WW
Combining Statement of Net Assets
June 30,2004
With Comparative Totals for June 30,2003 b,)
Revenue Consolidated Interfund Totals w0i
Area No.14 Revenue Area Eliminations 2004 2003
Current assets:
Cash and cash equivalents $ - $ 101,667,204 $ - $ 101,667,204 $ 7,142,459
Investments - 416,653,124 - 416,653,124 385,300,317
Due from other funds - 1,583,472 (1,583,472) - -
Accounts receivable,net of allowance
for uncollectibles 737,036 8,728,529 - 9.465,565 7,646.687
Accrued interest receivable 201,052 3,803,971 - 4,005.023 4,103,715
Due from other governmental agencies 4,182,762 - - 4,182.762 1.635,825
Connection fees receivable - 561,697 - 561.697 917,859
Property tax receivable - 1,073,114 - 1,073,114 1,289,484 W
Inventories 222,285 4,116,492 - 4,338,777 4,882,228
Prepaid and other assets 33,745 638,483 - 672,228 876,702
Total current assets 5,376,880 538,826,086 (1,583,472) 542,619,494 413,795,276
Noncurrent assets:
Restricted:
Cash and cash equivalents - 5,964,807 - 5,964,807 2,938,113
Investments - 81,994,903 - 81,994,903 31,709,443
Accrued interest receivable - 559,270 - 559,270 534,038
Unrestricted:
Non-depreciable capital assets 16,872,797 353,677,160 - 370,549,957 254,612,834
Depreciable capital assets,net of
accumulated depreciation 42,878,444 632,089,273 - 674,967,717 685,387,045
Deferred charges - 4,106,715 - 4,106,715 1,843.374
Excess purchase price over book
value on acquired assets,net 8,140,238 - - 8,140,238 8,797,947
Other assets,net 142,515 5,954,341 - 6,096,856 6,043,422
Total noncurrent assets 68,033,994 1,084,346,469 - 1,152,380,463 991,866,216 6W
Total assets 73,410,874 1,623,172,555 (1,583,472) 1,694,999,957 1.405,661,492
Current liabilities: hr
Accounts payable 604,022 13,310,480 - 13,914,502 16,029,577
Accrued expenses 296,767 5,779,988 - 6,076,755 5,479,532
Due to other funds 1.583,472 - (1,583,472) - -
Retentions payable 128,725 3,215,195 - 3,343,920 1,428,429
Interest payable - 8,855,862 - 8,855,862 3,073,632
Current portion of
long-term obligations 227,186 16,338,421 - _ 16,565,607 15,459,439
Total current liabilities 2,840,172 47,499,946 (1,583,472) 48,756,646 41,470,609
Noncurrent liabilities:
Noncurrent portion of W
long-term obligations 90,201 622,021,051 - 622,111 252 353,843,588
Total liabilities 2,930,373 669,520,997 (1,583,472) 670,867,898 395,314,197
LrJ
Net assets:
Invested in capital assets,
net of related debt 59,751,241 358,515,345 - 418,266,586 578,647,534
Restricted for debt service - 88,518,980 88,518,980 35,181,594
Unrestricted 10,729,260 506,617,233 - 517,346,493 396,518,167
Total net assets $70,480,501 $953,651,558 $ - $1,024,132,059 $1,010,347,295
Low
30
ORANGE COUNTY SANITATION DISTRICT
Combining Statement of Revenues, Expenses, and Changes in Net Assets
For the Year Ended June 30, 2004
With Comparative Totals for June 30, 2003
Revenue Consolidated Interfund Totals
Area No.14 Revenue Area Eliminations 2004 2003
Operating revenues:
„e Service charges $ 4,557,942 $ 97,436,725 $ - $ 101,994,667 $ 88,640,114
Permit and inspection fees 6,977 325,352 - 332,329 523,866
Total operating revenues 4,564,919 97,762,077 - 102,326,996 89,163,980
Operating expenses other than depreciation
and amortization:
Salaries and benefits 2,324,270 46,387,224 48,711,494 38,732,528
` Utilities 299,487 5,108,736 - 5,408,223 4,622,254
Supplies,repairs and maintenance 793,150 16,161,011 - 16,954,161 14,383,290
Contractual services 819,008 17,679,089 - 18,498,097 15,958,742
Directors'fees 15,714 125,726 - 141,440 139,751
Meetings and training 49,445 930,357 - 979,802 999,103
Other 232,616 4,477,563 4,710,179 4,833,132
Total operating expenses other than
depreciation and amortization 4,533,690 90.869,706 - 95,403,396 79,668,800
Operating income(loss)before
"w depreciation and amortization 31,229 6,892,371 - 6,923,600 9,495,180
Depreciation and amortization 4,067,150 41,393,188 - 45,460,338 43,036,601
%Ed Amortization of excess purchase price over
book value on acquired assets 657,709 - - 657,709 657,709
Operating loss (4,693,630) (34,500,817) - (39.194,447) (34,199,130)
Non-operating revenues:
Property taxes - 46,943,327 - 46,943,327 44,591,496
Investment and interest income 113,554 6,672,099 - 6,785,653 25,888,943
holo Capital facilities capacity charges 1,054,961 7,942,776 - 8,997,737 10,145,758
Other 10,716,057 898,110 (10,686,261) 927,906 705,706
Total non-operating revenues 11,884,572 62,456,312 (10,686,261) 63,654,623 81,331,903
wo
Non-operating expenses:
Interest - 15,524,457 15,524,457 12,731,179
wc� Capital grants to member agencies - 3,050,918 - 3,050,918 1,168,254
Other 56,121 11,974,982 (10,686,261) 1,344,842 26,010
Total non-operating expenses 56,121 30,550,357 (10,686,261) 19,920,217 13,925,443
Mel
Income(loss)before
capital contributions 7,134,821 (2,594,862) - 4,539,959 33.207,330
Capital contributions from other agencies 3,992,790 5,252,015 - 9,244,805 3,166,280
Change in net assets 11,127,611 2,657,153 - 13,784,764 36,373,610
%Ed Total net assets-beginning 59,352,890 950,994,405 - 1,010,347,295 973,973,685
Total net assets-ending $70,480,501 $953,651,558 $ - $1,024,132,059 $1,010,347,295
.ter
31
ORANGE COUNTY SANITATION DISTRICT
Combining Statement of Cash Flows
For the Year Ended June 30,2004
With Comparative Totals for June 30,2003
Revenue Consolidated Interfund Totals
Area No.14 Revenue Area Eliminations 2004 2003
Cash flows from operating activities:
Receipts from customers and users $ 4,822,159 $ 95,879,456 $ - $ 100,701,615 $ 93,042,680
Payments to employees (2,152,081) (45,819,454) - (47,971,535) (38,388,953)
Payments to suppliers (1,952,987) (43,329,289) - (45,282,276) (40,025,486)
Net cash provided by operations 717,091 6,730,713 - 7,447,804 14,628,241
Cash flows from noncapital financing activities:
Capital facilities capacity charges 1,054,961 8,298,938 - 9,353,899 10,688,100
Proceeds from property taxes - 47,159,697 - 47,159,697 44,368,254 6di
Grants to member agencies - (3,050,918) - (3,050,918) (1,168,254)
Net cash provided by noncapital financing activities 1,054,961 52,407,717 53,462.678 53,888,100
Cash flows from capital and related financing activities: yd
Additions to property,plant and equipment (10,781,767) (138,699,056) - (149,480,823) (112,913,330)
Disposal of property,plant,and equipment - 4,227,802 - 4,227,802 523,794
Additions to other assets - (3,416) - (3,416) (2,231)
Disposal of other assets 3,416 - - 3,416 2,231
Interest paid - (16,763,529) - (16,763,529) (11,661,494)
Principal payments on certificates of participation - (11,610,000) - (11,610,000) (11,024,999)
Proceeds from certificates of participation issuance - 278,672,948 - 278,672,948 -
Certificates of participation issuance costs - (1,616,176) - (1,616,176) -
Proceeds from capital contributions 2,180,262 5,252.015 - 7,432,277 3,012,734
Net cash provided(used)by capital and related
financing activities (8,598,089) 119,460,588 - 110,862,499 (132,063,295)
Cash flows from investing activities:
Proceeds from the sale of investments 33,530,015 2,568,932,242 - 2,602,462,257 4,324,857,132
Purchases of investments (26,955,969) (2,668,640,889) - (2,695,596,858) (4,425,681,766)
Interest received 128,353 18,784,706 18,913,059 24,010,931
Net cash provided(used)by investing activities 6,702,399 (80,923,941) - (74,221,542) (76,813,703)
Net increase(decrease)in cash and cash equivalents (123,638) 97,675,077 - 97,551.439 (140,360,657)
Cash and cash equivalents,beginning of year 123,638 9,956,934 - 10,080,572 150,441,229
Cash and cash equivalents,end of year $ - $ 107,632,011 $ - $ 107,632,011 $ 10,080,572
Reconciliation of operating loss to net cash provided
by operating activities:
Operating loss $(4,693,630) $ (34,500,817) $ - $ (39,194,447) $ (34,199,130)
Adjustments to reconcile operating loss to net
cash provided by operations:
Depreciation and amortization 4,724,859 41,393,188 - 46,118,047 43,694,310
Other non-operating revenues and expenses 32,773 960,561 - 993,334 746,185
(Increase)Idecrease in operating assets:
Due from other funds - (1,583,472) 1,583,472 - -
Accounts receivable (621,619) (1,197,259) - (1,818,878) 1,565,010
Due from other governmental agencies (734,409) - - (734,409) 1,607,984
Inventories (92,947) 363,243 - 270,296 (99,535)
Prepaid and other assets (8,057) 212,531 - 204,474 26,725
Increasel(decrease)in operating liabilities:
Accounts payable 144,746 (2,259,821) - (2,115,075) 2,070,692
Accrued expenses 131,663 465,560 - 597,223 (773,466)
Due to other funds 1,583,472 - (1,583,472) - -
Retentions payable 89,507 1,825,984 - 1,915,491 464,375
Arbitrage payable - 235,890 - 235,890 (283,170) 4.J
Compensated absences 119,030 576,082 - 695,112 220,885
Claims and judgments 41,703 239,043 - 280,746 (412,624)
Net cash provided by operations $ 717,091 $ 6.730,713 $ - $ 7,447,804 $ 14,628,241
Noncash Activities:
Unrealized gain(loss)on the fair value of investments $ (95,612) $ (11,400,722) $ - $ (11,496,334) $ 1,375,603
Net disposal of assets with no cash effect (45,386) (1,091,729) - (1,137,115) (66,489)
Certificates of participation issuance cost-underwriter's fee - (829,244) (829,244)
Certificates of participation original issue discount - (497,808) - (497,808)
Net transfer of assets between Revenue Areas 10,686,261 (10,686,261) - -
32
ORANGE COUNTY SANITATION DISTRICT
Schedule of Changes in Net Assets by Activity and Revenue Area
For the Year Ended June 30, 2004
Revenue Consolidated
Area No. 14 Revenue Area Totals
Collection activities:
Revenues and capital contributions:
�+ Permit and inspection fees $ 603 $ 204,745 $ 205,348
Other revenues 20,277 717,992 738,269
Other capital contributions 3,992,790 5,252,015 9,244,805
,,,4 Total revenues and capital contributions 4,013,670 6,174,752 10,188,422
Expenses:
Salaries and benefits 137,530 5,013,422 5,150,952
Now Utilities 49,238 373,945 423,183
Supplies, repairs and maintenance 138,789 3,780,268 3,919,057
Contractual services 61,175 3,340,649 3,401,824
kw Directors'fees 15,714 125,726 141,440
Meetings and training 950 12,776 13,726
Other expenses 141,200 2,974,845 3,116,045
km Total expenses 544,596 15,621.631 16,166,227
Net collection activities 3,469,074 (9,446,879) (5,977,805)
�+ Treatment and disposal activities:
Revenues:
Service charges 166,277 3,146,008 3,312,285
Permit and inspection fees 6,374 120,607 126,981
Investment and interest income 182 3,436 3,618
Other revenues 9,519 180,118 189,637
Total revenues 182,352 3,450,169 3,632,521
Expenses:
Salaries and benefits 2,186,740 41,373,802 43,560,542
Utilities 250,249 4,734,791 4,985,040
Supplies, repairs and maintenance 654,361 12,380,743 13,035,104
Contractual services 757,833 14,338,440 15,096,273
Meetings and training 48,495 917,581 966,076
Other expenses 147,537 2,791,439 2,938,976
Total expenses 4,045,215 76,536,796 80,582,011
Net treatment and disposal activities (3,862,863) (73,086,627) (76,949,490)
Unallocated revenues(expenses):
Service charges 4,391,665 94,290,717 98,682,382
Property taxes - 46,943,327 46,943,327
Investment and interest income 113,372 6,668,663 6,782,035
Capital facilities capacity charges 1,054,961 7,942,776 8,997,737
++� Transfer IBC area between Revenue Areas 10,686,261 (10,686,261) -
Interest expense - (15,524,457) (15,524,457)
Capital grants to member agencies - (3,050,918) (3,050,918)
Depreciation and amortization (4,724,859) (41,393,188) (46,118,047)
Total unallocated revenues(expenses) 11,521,400 85,190,659 96,712,059
Total change in net assets $ 11,127,611 $ 2,657,153 $ 13,784,764
33
W4
�J
1�J
W
4.�
W
(THIS PAGE INTENTIONALLY LEFT BLANK)
W
W.
W
lid
W
W
34 � j
Statistical Section
1 Statistical Section
J
ORANGE COUNTY SANITATION DISTRICT
Net Assets by Component
(Dollars in Thousands)
Last Four Fiscal Years (Note 1)
$1,200,000
$1,000,000
$800,000
$600,000
$400,000
$200,000
s0
2000-01 2001-02 2002-03 2003-04
❑Unrestricted
■Restricted for debt service
0Invested in capital assets, net of related debt'
Invested in
Capital Assets, Restricted
Net of Related for Debt
Fiscal Year Debt Service Unrestricted Total Net Assets
2000-01 $463,935 $36,468 $446,558 $ 946,961
2001-02 501,997 36,070 435,906 973,973
2002-03 578,647 35,182 396,518 1,010,347
2003-04 418,267 88,519 517,346 1,024,132
Note 1: Net Assets are calculated as a result of GASB 34, which was implemented in
FY 2001-2, retrospective to 2000-01. Ten years data will eventually be presented as
data is accumulated.
Source: Orange County Sanitation District's Accounting Division.
35
ORANGE COUNTY SANITATION DISTRICT
Revenues and Gross Capital Contributions by Source
r
(Dollars in Thousands)
Last Ten Fiscal Years
$117,980 w.
$94,384
$70,788
$47,192
$23,596
R
1994-95 1995.96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04
OOperating Revenue ■Non-Operating Revenue ■Contributed Capital
rr
Capacity
Operating Revenue Non-Operating Revenue Rights&
Permit& Cap.Facilities Total Capital w
Fiscal Service Inspection Total Property Capacity Non- Contrib-
Year Charges Fees Operating Taxes Interest Charges Other Operating utions
1994-95 $ 72,909 S 240 S 73,149 S 27,286 S 18,500 S 6,577 S 4,408 S 56,771 S 15,587
1995-96 71,362 120 71,482 29,285 20,209 9,493 4,224 63,211 2,266
1996-97 64,923 258 65,181 28,193 20,958 9,687 3,390 62,228 12,876
1997-98 59,517 329 59,846 31,287 27,897 11,251 3,283 73,718 -
1998-99 69,453 423 69,876 32,836 17,944 8,751 3,332 62,863 141
1999-00 81,241 396 81,637 35,557 20,836 7,867 2,573 66,833 4,589
2000-01 72,566 688 73,254 38,411 39,868 7,332 1,835 87,446 1,271
2001-02 79,609 396 80,005 41,140 28,073 10,560 2,202 81,975 8,603
2002-03 88,640 524 89,164 44,591 25,889 10,146 706 81,332 3,166
2003-04 101,995 332 102,327 46,943 6,786 8,998 928 63,655 9,245
Source: Orange County Sanitation District's Accounting Division.
36
ORANGE COUNTY SANITATION DISTRICT
Expenses by Type
(Dollars in Thousands)
Last Ten Fiscal Years
$150,000 - -- - - -- -
$140,000 - -- ---- --- - -- - - --
$130,000 -- -- - - - - - -
$120,000 - - --- - - -- --
$110,000
$100,000
$90,000 _
$80,000
$70,000 _f
.. $60,000 _
$50,000
$40,000
$30,000
$20,000 -
$10,000
.. $0
1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04
■Operating Expense ❑Non Operating Expense
Operating Non-Operating
Fiscal Personal Maint& Depr& Total Interest Total Non-
Year Services Utilities Other Amort Operating Expense Other(1) Operating
1994-95 S 29,399 $ 3,180 $ 27,369 $ 34,087 $ 94,035 S 23,941 $ 826 $ 24,767
1995-96 32,660 2,978 26,114 34,001 95,753 20,731 7,648 28,379
1996-97 31,523 3,744 22,851 35,284 93,402 21,237 1,497 22,734
1997-98 28,725 3,328 22,526 35,841 90,420 19,232 1,330 20,562
1998-99 28,809 3,320 22,546 42,492 97,167 18,359 70 18,429
1999-00 33,581 3,621 22,213 36,383 95,798 18,151 23,073 41,224
2000-01 33,734 5,524 23,062 44,188 106,508 17,923 88 18,011
2001-02 35,629 4,967 27,967 46,990 115,553 14,406 7,609 22,015
2002-03 38,733 4,622 36,314 43,694 123,363 12,731 1,194 13,925
2003-04 48,711 5,408 41,284 46,118 141,521 15,524 4,396 19,920
Notes
-- (1) - For FY 1999-00, Other Non-Operating Expense includes $22,994,647 for the loss on investment in the Orange
County Investment Pool.
Source: Orange County Sanitation District's Accounting Division.
37
ORANGE COUNTY SANITATION DISTRICT
Change in Net Assets _
(Dollars in Thousands)
Last Four Fiscal Years (Note 1)
$1,040,000
$1,020,000
$1,000,000
$980,000
$960,000
$940,000
$920,000
$900,000
2000-01 2001-02 2002-03 2003.04
Ending Net Assets by Fiscal Year
Total Change in Beginning Ending
Fiscal Year Revenues Total Expenses Net Assets Net Asset Net Assets
2000-01 $161,971 $ 133,543 $28,428 $ 918,533 $ 946,961
2001-02 164,580 137,568 27,012 946,961 973,973
2002-03 173,662 137,288 36,374 973,973 1,010,347
2003-04 175,226 161,441 13,785 1,010,347 1,024,132
Note 1: Net Assets are calculated as a result of GASB 34, which was implemented in FY 2001-2,
retrospective to 2000-01. Ten years information will eventually be presented as data is accumulated.
Source: Orange County Sanitation District's Accounting Division.
38
tow
ORANGE COUNTY SANITIATION DISTRICT
Cash and Investments Reserves Balances
tw (Dollars in Millions)
Last Ten Fiscal Years
tw
Capital Debt
Cash Flow Self- Improvement Service
Fiscal Year Contingency Insurance Program Requirements Total
1994-95 $44 $194 $110 $21 $369
1995-96 42 243 55 46 386
1996-97 39 82 195 60 376
1997-98 63 89 188 33 373
1998-99 56 54 233 33 376
1999-00 60 57 284 32 433
2000-01 77 56 311 33 477
2001-02 70 57 303 35 465
2002-03 100 57 237 33 427
2003-04 71 57 390 88 606
Notes:
The Cash Flow Contingency Reserve is to fund operations, maintenance, and certificates of participation debt
service expenses for the first half of the fiscal year, prior to the receipt of the first installment of the property tax
allocation and sewer service user fees.
The Self-Insurance Reserve is to provide requirements for property damage including fire, flood and earthquake,
general liability and workers' compensation.
The Capital Improvement Program Reserve is to fund annual increments of the capital improvement program
with a target level at one half of the average annual capital improvement program through the year 2020.
The Debt Service Required Reserves are monies held and controlled by a trustee pursuant to the provisions of
certificates of participation issues, and the monies are not available for the general needs of the District.
bow
bw
Source: Orange County Sanitation District's Accounting Division.
39
w
ORANGE COUNTY SANITIATION DISTRICT
Cash and Investment Portfolio
as of June 30, 2004 L'
Cost Market Value Net Unrealized Gain/Loss
Shares Par Base Base %of Total Base
Investment Portfolio:
Cash and Cash Equivalents(U.S.Dollar):
Pending Trades $ (52,327.483.66) $ (52,327,483.66) -10.45% $ ww
Interest - 3,903,191.79 3,903,191.79 0.78% -
Certificates of Deposit-Domestic 2,100,000.00 2,100,000.00 2,100,000.00 0.42% -
Commercial Paper-Discount 3,000,000.00 2,989,360.00 2,989,360.00 0.60% -
Fed Hm Loan Bnk-Less Than 1 Year 15,300,000.00 15,272,553.53 15,272,553.53 3.05% -
Federal Home Loan Mortgage-Less Than 1 Yr 22,500,000.00 22,422,007.36 22,422,007.36 4.48% -
FNMA Issues-Less Than 1 Year 20,000,000.00 19,941,122.55 19,941,122.55 3.98% -
Mutual Funds 10,506,949.92 10,505,949.92 10,506,949.92 2.10% -
Repurchase Agreements 17,700,000.00 17,700,000.00 17,700,000.00 3.53% - w
Treasury Bills-Less Than 1 Year 30,300,000.00 30,167,391.64 30,167,391.64 6.02% -
Subtolal 121,406,949.92 72,675,093.13 72,675,093.13 14.51% -
Fixed Income Securities(U.S.Dollar):
ABS-Airplane Receivables 1,600,000.00 1,600,000.00 149,216.00 0.03% (1,450,784.00) 6mi
ABS-Home Equity 886,044.05 886,044.05 879,260.50 0.18% (6,783.55)
Banking&Finance 15,652,000.00 15,773,233,18 15,841,507.68 3.16% 68,274.50
Collateralized Mortgage Obligation 2,069,684.50 2,069,684.50 2,199,453.72 0.44% 129,769.22
FHLMC Multiclass 945,034.19 946,040.98 945.412.20 0.19% (628.78) wow
FHLMC Pools 70,064.66 68,356.82 72,409.65 0.01% 4,052.83
FNMA Pools 60,549,689.22 61,255,557.93 60,989,715.55 12.18% (265,842.38)
FNMA Remic 900,000.00 918,000.00 906,395.94 0.18% (11,604.06)
GNMA Multi Family Pools 3.040.979.67 3,016,895.06 3,031,810.50 0.61% 14,915.44 w
GNMA Single Family Pools 8,828,764.08 8,854,464.87 9,049,328.01 1.81% 194.863.14
Inflation Indexed Securities 35,002,290.00 35,019,209.79 38,234,401.22 7.63% 3,215,191.43
Insurance 1,600,000.00 1,594,032.00 1,670,000.00 0.33% 75,968.00
PVT Placements-More Than 1 Year 752,000.00 826,199.84 826,199.84 0.16% -
U.S.Agencies 33,990,306.26 34,957,904.32 35,307,019.85 7,05% 349,115.53
U.S.Governments 250,060,886.08 258,298,043.23 253,184,219.25 50.55% (5,113,823.98)
Utility-Electric 4,750,000.00 4,694,370.00 4,874,272.50 0.97% 179,902.50
Subtotal 420,697,742.71 430,778,036.57 428,160,622.41 85.49% (2,617,414.16) w
Total Investment Portfolio 542,104,692.63 503,453,129.70 500,835,715.54 100.00% $ (2,617,414.16)
Less: Interest (3,903,191.79) (3,903,191.79)
Demand Cash Accounts (8,472.632.00) (8,472,632.00) L.�
Monies Held With Fiscal Agents 87,959,710.00 87,959,710.00
Monies with the Local Agency Investment Fund 29,860,436.00 29,860,436.00
Total Cash and Investments $ 608,897,451.91 $ 606,280,037.75
6.a
6w
w
w
6w
Source: Mellon Trust and the Orange County Sanitation District's Accounting Division.
ww
40
ORANGE COUNTY SANITATION DISTRICT
Assessed and Estimated Actual Value of Taxable Property
(Dollars in Millions)
Last Ten Fiscal Years
6250.000-so
5?;YJ cNvl /
.a
199596 1996-97 19,97-98 199899 19"00 2000-01 2001-02 2002-03 2003-04
■Secured Property Assessed Value v Unsecured Property Assessed Value
Secured Property Unsecured Property Totals
Ratio of Total Percent
., Estimated Estimated Estimated Assessed to Change in
Assessed Actual Assessed Actual Assessed Actual Estimated Assessed
Fiscal Year Value Value Value Value Value Value Value Value
1994-95 $ 123,525 $ 123,525 $3,871 $3,871 $ 127,396 $ 127,396 100% -0.46%
1995-96 122,524 122,524 3,372 3,372 125,896 125,896 100% -1.18%
1996-97 122,304 122,304 3,247 3,247 125,551 125,551 100% -0.27%
1997-98 125,018 125,018 3,302 3,302 128,320 128,320 100% 2.21%
1998-99 131,295 131,295 3,394 3,394 134,689 134,689 100% 4.96%
1999-00 142,126 142,126 3,507 3,507 145,633 145,633 100% 8.1390
2000-01 155,544 155,544 3,778 3,778 159,322 159,322 100% 9.40%
2001-02 169,357 169,357 4,066 4,066 173,423 173,423 100% 8.85%
2002-03 183,223 183,223 5,657 5,657 188,880 188,880 100% 8.91%
2003-04 197,143 197,143 4,309 4,309 201,452 201,452 100% 6.66%
Source: Orange County Auditor-Controller's Office.
41
ORANGE COUNTY SANITATION DISTRICT
Property Tax and User Fee Levies and Collections
(Dollars in Thousands)
Last Ten Fiscal Years
w
$140,000
$120,000
$100,000
$80,000 -
w
$60,000
$40,000
w
i
$20,000
$0
w
1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002.03 2003-04
Now
OTotal Tax and User Fee Levy ■Total Tax and User Fee Collection
r
Current Total Tax %of
Total Tax Tax and Percent of Delin- and User %of Total O/S Delinquen-
and User User Fee Levy quent Fee Collection Delinquen- cies to Tax
Fiscal Year Fee Levy Collection Collected Collection Collection to Levy cies Levy r,
1994-95 $92,353 $91,945 99.56% $86 S 92,031 99.65% $408 0.44 %
1995-96 91,775 91,596 99.80 812 92,408 100.69 179 0.20
1996-97 89,794 89.570 99.75 180 89.750 99.95 224 0.25
1997-98 90,589 90,078 99.44 81 90,159 99.53 510 0.56
1998-99 98,557 98,267 99.71 74 98,341 99.78 291 0.30
1999-00 107,948 107,794 99.86 72 107,866 99.92 154 0.14
2000-01 105,890 105,646 99.77 94 105,740 99.86 245 0.23
r.
2001-02 112,419 112,087 99.70 83 112,170 99.78 332 0.30
2002.03 122,450 122,210 99.80 98 122,308 99.88 241 0.20
2003-04 134,389 134,132 99.81 94 134,226 99.88 257 0.19 w
Source: Orange County Auditor-Controller's Office.
42
ss
ORANGE COUNTY SANITATION DISTRICT
Property Tax Rates- Direct and Overlapping Governments
WW (per$100 of asessed value)
Last Ten Fiscal Years
am Fiscal Basic OCSD#11, 1958
Year 1%Levy Bond I&R Fund Total
1994-95 1.00000 0.00019 1.00019
ow 1995-96 1.00000 0.00018 1.00018
1996-97 1.00000 0.00010 1.00010
1997-98 1,00000 0.00010 1.00010
1998-99 1.00000 0.00020 1.00020
No 1999-00 1.00000 0.00000 1.00000
2000-01 1.00000 0.00000 1.00000
2001-02 1.00000 0.00000 1.00000
00 2002-03 1.00000 0.00000 1.00000
2003-04 1.00000 0.00000 1.00000
00 Source: County of Orange Auditor-Controller's Office.
ow
ORANGE COUNTY SANITATION DISTRICT
Principal Users
For the Current Fiscal Year and Nine Years Ago
MW
Fiscal Year Ended 6/30104 Fiscal Year Ended 6130195
%to Total %to Total
ew Service Service Charge Service Service Charge
User Charges Rank Revenue Charges Rank Revenue
Alstyle Apparel-Activewear Mfg. $583,330 1 0.66%
ow Stremicks Heritage Foods, LLC 510,594 2 0.58%
Disneyland Resort&Park 458,792 3 0.52%
MCP Foods, Inc. 454,965 4 0.51%
Wd House Foods America Corp. 385,662 5 0.44%
Kimberly-Clark Worldwide, Inc. 368,243 6 0.42% $ 671,211 1 0.95%
U.S. Dyeing & Finishing, Inc. 290,228 7 0.33%
Disneyland Resort--DCA 252,466 8 0.28%
tow Van Law Food Products, Inc. 237,297 9 0.27%
Knotts Berry Farm Foods 189,281 10 0.21%
Hunt-Wesson, Inc. 352,296 2 0.50%
Shell Western E&P 261,638 3 0.36%
Adohr Farms 249,273 4 0.35%
Marine Corps Air Station 210.596 5 0.30%
NO Pepsi-Cola Bottling 193,078 6 0.27%
Sundor Brands 181,413 7 0.26%
Coca-Cola Foods 161,056 8 0.23%
Kraft Foods, USA 138,199 9 0.20%
Anaheim Citrus 134,342 10 0.19%
$3,730,858 4.22% $2,543,102 3.61%
Source: Orange County Sanitation District's Accounting Division.
43
w
ORANGE COUNTY SANITATION DISTRICT
Number of Accounts and Revenues by Customer Class W
(Dollars in Millions)
Last Ten Fiscal Years
Residential/Commercial Industrial 6W
Number of Total Percentage Total Percentage
Equivalent Sewer Svc. of Sewer Number of Sewer Svc. of Sewer
Single-Family Charge Service Charge Customer Charge Service Charge '
Fiscal Year Dwellings Revenue Revenues Accounts Revenue Revenues
1994-95 858,076 $51.1 88% 935 $7.0 12%
1995-96 849,576 58.1 90% 892 6.6 10% W
1996-97 814,001 66.2 92% 869 6.0 8%
1997-98 851,770 62.2 92% 678 5.7 8%
1998-99 882,103 61.6 89% 678 7.8 11%
1999-00 919,072 72.0 89% 649 9.1 11%
2000-01 883,603 64.5 91% 596 6.6 9%
2001-02 898,031 70.3 90% 573 7.5 10% 6W
2002-03 897,757 77.0 92% 603 6.3 8%
2003-04 860,156 86.0 92% 460 7.5 8%
W
Source: Orange County Sanitation District's Accounting Division.
6W
Imi
ORANGE COUNTY SANITATION DISTRICT
Annual Sewer Service Charges
Single Family Residence Rate
Last Five Fiscal Years and Next Fiscal Year(Note 1)
Sewer Service
Fiscal Year Charge
1999-00 $ 81.02
2000-01 78.00 �+
2001-02 80.00
2002-03 87.50
2003-04 100.00 6W
2004-05 115.00
Note 1: Prior to FY 1999/00, the District was comprised of nine separate Districts, and each District had their
own rate. Data on the District's single rate will be compiled and will be added to this schedule until ten year's
accumulated data is available.
W
Source: Orange County Sanitation District's Accounting Division.
W
44
6W
d.
ORANGE COUNTY SANITATION DISTRICT
Comparison of The Volume of Wastewater Treated
too With Revenues and Expenses
Last Ten Fiscal Years
.n Millions of
Gallons of
Waste- Treatment
water &Disposal Total Total Total Total
Treated Cost per Operating Non-Operating Operating Non-Operating
Fiscal Per Million Costs Costs Revenues Revenues
Year Day Gallons (in Thousands) (In Thousands) (In Thousands) (In Thousands)
1994-95 243 $526.98 $94,035 $24,767 $73,149 $56,771
1995-96 237 553.25 95,753 28,379 71,482 63,211
1996-97 244 526.29 93,402 22,734 65,181 62,228
1997-98 254 465.75 90,420 20,562 59,846 73,718
1998-99 241 481.96 97,167 18,429 69,876 62,863
1999-00 241 500.75 95,798 41,224 81,637 66,833
2000-01 246 512.78 106,508 18,011 73,254 87,446
bob 2001-02 234 563.09 115,553 22,015 80,005 81,975
2002-03 239 730.32 123,363 13,925 89,164 81,332
2003-04 238 882.94 141,521 19,920 102,327 63,655
.w
An Interim Strategic Plan Update to the year 2020 was completed in September 2002 that projects wastewater
treatment flows to increase to 284 millions of gallons per day(mgd) in 2010, to 302 mgd in 2015, and to 321
mgd in the year 2020. In order to manage the anticipated increase in wastewater flows, the District has
identified a$2.4 billion capital expansion plan through 2020.
Total expenses in FY 2003-04 increased $42.6 million, or 35.9 percent since FY 1994-95, primarily as a result of
(1)the expected increase in wastewater flows, (2)the District's decision beginning in FY 2002-03 to maximize
existing secondary treatment facilities as the Agency moves from a 50/50 mix of primary and secondary effluent
treatment to meeting secondary treatment standards by December 31, 2012, and (3) the District's decision to
eliminate most bacteria from the ocean outfall discharge by disinfecting the effluent beginning in FY 2002-03 at
an additional cost in chemicals of$7 million annually.
Depreciation expense represents 28.2 percent of the increase as a result of the previous expansion in capital
facilities and the financing associated with the expansion. Maintenance, chemicals, utilities, and other operating
tow costs represent another 32.6 percent of the increase, and are primarily due to the increase in the levels of
treatment referred to above. In FY 2003-04, personnel expenses rose 25.8 percent over the prior year. This
increase is mainly due to the additional 27 full-time equivalent positions authorized in FY 2003-04.
As depicted from the chart above, actual wastewater treatment flows have consistently remained between 237
mgd and 244 mgd, other than in FY 1997-98 which reached a high of 254 mgd and in FY 2000-01 which
.r reached 246 mgd. Due to normal weather conditions during the year, FY 2003-04 had flows of 238 mgd.
Source: Orange County Sanitation District.
45
ORANGE COUNTY SANITATION DISTRICT
Property Value and Construction
Covering The Entire County of Orange(i)
(Dollars In Thousands)
Last Ten Fiscal Years
Non-
Assessed Residential Residential
Property Value(2) Constr. (3) Construction (3) Total ►�+
Fiscal Calendar No.of Construction
Year Value Year Value Units Value Value(3)
1994-95 $ 176,974,944 1995 $ 582,712 8,300 $1,295,297 $1,878,009
1995-96 172,508,373 1996 760,809 10,207 1,528,835 2,289,644
1996-97 177,300,663 1997 1,079,687 12,251 2,007,084 3,086,771
1997-98 182,284,316 1998 1,529,698 10,101 1,864,084 3,393,782
1998-99 192,625,739 1999 1,614,422 12,348 2,262,492 3,876,914
1999-00 209,136,472 2000 1,762,142 12,367 2,210,775 3,972,917
2000-01 228,548,301 2001 1,349,607 8,646 1,905,321 3,254,928 68'
2001-02 248,966,581 2002 1,208,626 12,020 2,328,123 3,536,749
2002-03 269,684,864 2003 1,005,547 9,310 2,076,443 3,081,990
2003-04 287,923,828 2004 (4) 1,085,485 9,370 2,384,401 3,469,886 W
Notes and Data Sources 6.j
(1) - The Orange County Sanitation District services 471 square miles or 59% of the total 799 square
miles that make up the boundaries of the County of Orange.
(2) - Data Source-Orange County Auditor-Controller's Office.
(3) - Data Source-"The Chapman University Economic& Business Reivew."
rw
(4) - Forecasted numbers.
6W
46
krd
ORANGE COUNTY SANITATION DISTRICT
Ratio of Annual Debt Service for
-- Bonded Debt to Total Expenses
(Dollars in Thousands)
Last Ten Fiscal Years
60.0%-
50.0%-
40.0%
30.0%-
20.0%-
-
10.0%-
.r
1994-95 1995.96 1996-97 1997-98 1998-99 1999-00 2000.01 2001-02 2002-03 2003-04
-
Total Ratio of Debt
Principal Total Debt Operating Service to Total
Fiscal Year (1) Interest Service Expenses(2) Operating Expenses
1994-95 $ 9,670 $ 25,439 $ 35,109 $ 59,948 58.57%
1995-96 10,180 21,298 31,478 61,752 50.97
-
1996-97 10,680 20,463 31,143 58,118 53.59
1997-98 11,320 20,008 31,328 54,579 57.40
1998-99 12,120 18,475 30,595 54,675 55.96
1999-00 12,880 17,169 30,049 59,415 50.57
2000-01 13,790 16,690 30,480 62,320 48.91
2001-02 10,370 13,051 23,421 68,563 34.16
2002-03 11,025 11,433 22,458 79,669 28.19
2003-04 11,610 22,508 34,118 95,403 35.76
- Notes
(1)- Excludes principal reductions due to advanced refunding.
(2)- Excludes depreciation and amortization expense.
Source: Orange County Sanitation District's Accounting Division.
47
-
ORANGE COUNTY SANITATION DISTRICT
Bond Coverage
(Dollars in Millions)
Last Six Fiscal Years
r-
4.50 - - - --
4.00 - - -- ----
3.50
3.00
2.50
2.00
1.50
1.00
0.50
1998-99 1999-00 2000-01 2001-02 2002-03 2003-04
Fiscal Year Ending June 30,
1999 2000 2001 2002 2003 2004
Revenues
Sewer Service Charges, net of refunds $ 61.6 $ 72.0 $ 64.5 $ 70.3 $ 77.0 $ 86.0
Industrial Sewer Service Charges 7.8 9.1 6.6 7.5 6.3 7.5
Revenue Area No. 14 Fees 0.7 2.2 2.0 2.2 3.2 5.8
Ad Valorem Taxes 32.8 35.6 38.4 41.1 44.6 46.9
Interest Earnings 17.9 20.5 39.4 27.8 25.9 6.8
Capital Facilities Capacity Charges 9.5 7.9 7.3 10.6 10.1 9.0 �-
Other Revenues 2.4 1.2 2.5 2.5 3.4 4.0
Total Revenues(operating and non-operating) 132.7 148.5 160.7 162.0 170.5 166.0
Operating Expenses(excludes depreciation) 54.7 59.4 62.3 68.6 79.7 95.4 _
Net Revenues $ 78.0 $ 89.1 $ 98.4 $ 93.4 $ 90.8 $ 70.6
Debt Service Requirements
Principal Payments 12.1 12.9 13.8 10.4 11.0 11.6
Interest Payments 18.5 17.2 16.7 13.0 11.4 22.5
Total Debt Service Requirements $ 30.6 $ 30.1 $ 30.5 $ 23.4 $ 22.4 $ 34.1
..y
Coverage Ratios 2.55 2.96 3.23 3.99 4.05 2.07
Ending Reserves, Excluding Debt Service Funds $ 343.0 $ 401.0 $ 444.0 $ 430.0 $ 394.0 $ 518.0
r.,
Source: Orange County Sanitation District's Accounting Division.
r
48
r+ ORANGE COUNTY SANITATION DISTRICT
Computation of Direct and Overlapping Debt
June 30, 2004
to 2003-04 Assessed Valuation(Land&Improvements Only): $180,505,310,165(after deducing$20,947,092,074 redevelopment
Incremental valuation)
%Applicable Debt 6/30/04
Overlapping Tax and Assessment Debt (Based on redevelopment adjusted all property assessed valuation of$187,808,402,503):
WIN Orange County Teeter Plan Obligations 72.465% $ 90,164,576
Metropolitan Water District of Southern California 15.356 68,714.261
Coast Community College District 99.526 109,478,600
North Orange County Joint Community College District 96.844 230,327,960
oft Rancho Santiago Community College District 98.321 94,511,061
Brea-Olinda and Laguna Beach Unified School Districts 97.794&6.659 28,181.285
Newport Mesa Unified School District 99.999 109,083,909
Placentia-Yorba Linda Unified School District 98.597 72,145,933
Santa Ana Unified School District 100.000 142,623,156
bw Tustin Unified School District School Facilities Improvement District No.2002-1 98.701 14,805,150
Anaheim and Fullerton Joint Union High School Districts 100.000 150,217,812
School Districts 100.000 183,088,111
Cities Various 6,999.637
how Irvine Ranch Water District Improvement Districts Various 212,326,602
Yorba Linda County Water District,I.D.No.2 100.000 1,620,000
Other Special Districts 100.000 790,000
Bonita Canyon Community Facilities District No.98-1 100.000 44,325,000
Irvine Unified School District Community Facilities District No.86-1 99.998 98,653,027
Tustin Unified School District Community Facilities District No.88-1 and 97-1 100.000 163,442,675
Orange County Community Facilities District No.87-4 99.836 71,683,796
Other Community Facilities Districts Various 258,027,023
Orange County Assessment Districts 100.000 102,629,366
low City of Irvine 1915 Act Bonds 100.000 633,461,759
City of Tustin 1915 Act Bonds 100.000 64,710,000
Other 1915 Act Bonds Various 25,423,996
Total Overlapping Tax and Assessment Debt $2,977,434,695
rr Direct and Overlapping Other Debt:
Orange County General Fund Obligations 72.465% $ 671,257,063
Orange County Pension Obligations 72.465 84,619,186
Orange County Board of Education Certificates of Participation 72.465 14,456,768
WW Orange County Transit District Authority 72.465 3,579,771
Coast Community College District Certificates of Participation 99.526 7,633,644
South Orange County Community College District Certificates of Participation 34,057 14,263,072
Brea-Olinda Unified School District Certificates of Participation 97.794 32,364,924
Orange Unified School District Certificates of Participation 96.671 50,906,949
'm Santa Ana Unified School District Certificates of Participation 100.000 48,587,686
Other Unified School District Certificates of Participation Various 26,555,618
Union High School District Certificates of Participation Various 47,654,729
School District Certificates of Participation Various 26,233,122
wo City of Anaheim General Fund Obligations 99.145 674,948,972
City of Fullerton General Fund Obligations 100.000 36,526,753
City of Huntington Beach General Fund Obligations 99.982 80,940,869
City of Irvine General Fund Obligations 100.000 48,270,000
WW City of Santa Ana General Fund Obligations 100.000 135,595.101
Other City General Fund Obligations Various 187,968,212
Orange County Sanitation District Certificates of Participation(1) 100.000 -0-
Irvine Ranch Water District Certificates of Participation 88.188 43,035,744
Municipal Water District of Orange County Water Facilities Corporation 67.203 28,033,731
WW Yorba Linda County Water District Certificates of Participation 97.472 10,375,894
Orange County Fire Authority 44.777 10,099,452
Other Special District Certificates of Participation 100.000 75.000
Total Gross Direct and Overlapping Other Debt $2,433,447,260
WW Less: Orange County Transit District Authority(80%self-supporting) 2,863,817
City of Anaheim self-supporting obligations 639,147,489
Other City self-supporting obligations 10,501,799
MWDOC Water Facilities Corporation(100%self-supporting) 28,033,731
�Xw Total Net Direct and Overlapping Other Debt $1,752,900,424
Gross Combined Total Debt(2) $5,410,881,955
Net Combined Total Debt $4,730,335,119
(1) Excludes certificates of participation supported by wastewater revenues.
No (2) Excludes tax and revenue anticipation notes,revenue,mortgage revenue and tax allocation bonds and non-bonded capital lease obligations.
Ratios to: Total Overlapping Tax and Assessment Debt Gross Combined Total Debt Net Combined Total Debt
Land&Improvement Assessed Valuation 1.49% 3.01% 2.61%
All Property Assessed Valuation N/A 2.89% 2.51%
STATE SCHOOL BUILDING AID REPAYABLE AS OF 6/30/03: $16,777,042
Source: California Municipal Statistics.
49
l
6.r
ORANGE COUNTY SANITATION DISTRICT
Demographic Statistics
Covering The Entire County of Orange(i)
Last Ten Fiscal Years
i
l�r
(2) (3) (4) (6)
Population Median Public School (5) Total Debt
Fiscal Estimates Family Enrollment Unemployment COP Debt Per
Year (In Thousands) Income (In Thousands) Rate (In Thousands) Capita
low
1994-95 2,641 $55,507 412 5.1% $418,375 $158
1995-96 2,624 57,106 422 4.1% 408,210 156
1996-97 2,632 59,629 443 3.2% 397,545 151 6w
1997-98 2,615 61,812 458 2.9% 386,240 148
1998-99 2,776 63,478 471 2.6% 374,135 135
1999-00 2,828 69,310 483 2.9% 361,255 128 6w
2000-01 2,880 70,577 494 3.0% 386,370 134
2001-02 2,940 70,887 503 4.1% 376,000 128
2002-03 2,979 72,985 512 4.0% 364,975 123 Ir
2003-04 3,017 74,814 (7) 515 3.6% 633,365 210
Notes and Data Sources
(1)-The Orange County Sanitation District services 471 square miles or 59%of the total 799 square
miles that make up the boundaries of the County of Orange.
(2)-Data Source-Demographic Research Unit, California Department of Finance. 6w
(3)-Data Source-Anderson Center for Economic Research, Chapman University
V
(4)-Data Source-California Department of Education, Educational Demographics Unit.
(5)-Data Source-State of California, Employment Development Department as of June 30 of each fiscal
year.
(6)- Data Source-Orange County Sanitation District's Accounting Division. Equals total certificates of
participation outstanding at the end of the year.
(7)-Estimated number.
i
50
ORANGE COUNTY SANITATION DISTRICT
Estimated Populations Served by the
Orange County Sanitation District
June 30, 2004
Population
as of
bow January 1, 2004
Anaheim 343,000
Brea 38,950
d. Buena Park 80,600
Costa Mesa 113,000
Cypress 48,450
e•+ Fountain Valley 56,500
Fullerton 134,200
Garden Grove 171,000
Md Huntington Beach 198,800
Irvine 171,800
La Habra 61,500
,d La Palma 16,050
Los Alamitos 11,950
Newport Beach 80,800
tow Orange 136,700
Placentia 49,900
Santa Ana 349,100
WW Seal Beach 24,950
Stanton 38,600
Tustin 70,300
Villa Park 6,200
Westminister 91,500
Yorba Linda 64,000
Subtotal City(1) 2,357,850
Estimated Population Served in
Unincorporated Areas(2) 83,500
2,441,350
bW
Data Sources:
(1) Demographic Research Unit, California Department of Finance.
(2)Orange County Sanitation District Accounting Division.
51
ORANGE COUNTY SANITATION DISTRICT
Insurance in Force
As of July 1,2004
I '
Type Insurer Deductible Limit I..I
All-Risk Property
Fire and Other Perils Public Entity Property $25,000 per occurrence $750 million/occurrence
Insurance Program
Flood Public Entity Property $100,000 per occurrence $300 million/occurrence
Insurance Program e•+
Earthquake Not Applicable Not Applicable Self-insured
Boiler&Machinery Lexington Insurance Co.,CNA $25,000 to $100 million/occurrence
Insurance Co., and Foreign $100,000
Excess Insurance Co.
Employee Dishonesty/ Hartford Fire, National Union $2,500 $1 million/loss; jam,
Faithful Performance/ Fire, and Great American $4 million excess policy
Errors &Ommissions Insurance Companies
6W
Excess Insurance Co of the State of $250,000 $25 million/occurrence
General Liability PA(first$10 million and annual aggregate
layer); Gulf Underwriters 6+
Insurance Company($15
million layer excess$10 million)
Travel&Accident Nationwide Life Insurance $0 Accidental Death &
Dismemberment:
Class 1: Elected Officials;
$500,000 per occurrence
Class 2: Employees;
10 X annnual salary, up to WEI
$500,000 per occurrence
Excess Workers'
Compensation CA Public Entity Insurance $500,000 $50 million each accident, W
Authority Each Accident each employee
v
6W
Source: Orange County Sanitation District's Risk Management Office.
iw
52
lam,
ORANGE COUNTY SANITATION DISTRICT
Authorized Full-time Equivalents by Function
�. Last Ten Fiscal Years
400
350-
300
250
200
150
100
50- l
_ 0-
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004
N General Management ■Finance ❑Human Resources ❑Technical Services
■Engineering 0Operations and Maintenance ■Information Technologies
Fiscal Year Ending June 30,
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004
General Management 18 21 18 16 15 13 12 17 17 17
Finance 40 42 41 39 38 37 37 39 39 40
Human Resources 25 19 17 18 17 17 18 19 28 30
Technical Services 128 121 104 100 93 88 87 95 94 100
Engineering 74 77 73 72 67 75 73 104 79 80
Operations and Maintenance 362 375 342 289 286 255 250 261 272 285
Information Technologies 21 23 21 26 26 33 33 39 40 44
Total FTE's 668 678 616 560 542 518 510 574 569 596
Source:Orange County Sanitation District's Accounting Division.
53
ORANGE COUNTY SANITATION DISTRICT
Biosolids Produced
Last Ten Fiscal Years
55,000
50,000
45,000 ..
40,000
35,000
30,000
25,000
20,000
O 1994-95 ■1995-96 O 1996-97 O 1997-98 ■1998-99
■1999-00 ❑2000-01 O 2001-02 ®2002-03 ■2003.04
Fiscal Year Tonnage
1994-95 40,228
1995-96 38,802
1996-97 39,386
1997-98 42,645
1998-99 41,127
1999-00 42,831
2000-01 42,254
2001-02 42,505
2002-03 47,631
2003-04 50,519
Source:Orange County Sanitation District's Environmental Assessment Division.
54
MW
ORANGE COUNTY SANITATION DISTRICT
,t, Miscellaneous Statistics
June 30, 2004
MW District Organization: The Orange County Sanitation District is one consolidated district made up of two
revenue areas which service unincorporated county areas and twenty-three cities and related special districts,
as follows:
d.+ Consolidated Revenue Area
County of Orange(unincorporated areas)
Cities:
w Anaheim Huntington Beach Santa Ana
Brea Irvine Seal Beach
Buena Park La Habra Stanton
Costa Mesa La Palma Tustin
m-+ Cypress Los Alamitos Villa Park
Fountain Valley Newport Beach Westminster
Fullerton Orange Yorba Linda
Garden Grove Placentia
Special Districts:
Midway City Sanitary District
Costa Mesa Sanitary District
Revenue Area No. 14
County of Orange (unincorporated areas)
Cities:
Irvine
Orange
Tustin
Special District:
Irvine Ranch Water District
Governing Body: 25-member Board of Directors
Authorized Full-Time Equivalent Employees: 596
Operational Date: July 1, 1954
Authority: California Health & Safety Code Section 4700 et. seq.
too Services: Wastewater collection, treatment, and disposal
Service Area: 471 square miles
Population Served: 2.4 million
Total Miles of Trunk and Subtrunk Sewers: 650 miles
Number of Pumping Stations: 19
Wastewater System Treatment Capacities (Million Gallons per Day)
Existing Primary Existing Secondary Planned Capacity
Actual Flows Treatment Capacity Treatment Capacity by 2020
Plant 1 87 108 75 170
Plant 2 151 168 90 150
Total ZM 2
Source: Orange County Sanitation District's Accounting Division.
m
55
aw
W
Ll
L
L
L
(THIS PAGE INTENTIONALLY LEFT BLANK)
L
Ll
W
L
L
L
Ll
Ll
L
56 L
ORANGE COUNTY SANITATION DISTRICT
(714) 962-2411
www.ocsd.com
Mailing Address:
P.O. Box 8127
Fountain Valley, California
92728-8127
Street Address:
10844 Ellis Avenue
Fountain Valley, California
92708-7018
OCSD 6/30/04