HomeMy WebLinkAbout2004-10-27phone:
(7141 962-2411
fax:
[714) 962-0356
www.ocsd.com
mailing address:
P.O. Box 8127
Fountain Valley. CA
92728-8127
street address:
10844 Ellis Avenue
Fountain Valley. CA
92708-7018
Member
Agencies
•
Cities
Anaheim
Brea
Buena Parle
Cypress
Fountain Valley
Fullerton
Garden Grove
Huntington Besc h
Irvine
La H abra
La Palma
Los Alamitos
Newport B each
Orange
Placentia
Santa Ana
Seal Beach
Stanton
Tustin
Vi/ls Park
Yorba Linda
County of Oran ge
Sanitary Districts
Costa M esa
Midway City
Water Districts
lrvrne Ranch
O RANGE COUNTY SANITATION DISTR ICT
October 20, 2004
NOTICE OF MEETING
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
WEDNESDAY, October 27, 2004-7:00 P.M.
DISTRICT'S ADMINISTRATIVE OFFICES
10844 Ellis Avenue
Fountain Valley, California 92708
The Regular Meeting of the Board of Directors of the Orange County Sanitation
District will be held at the above location, time and date.
JJ!.
OMTS COMMITTEE -Wednesday, November 3, 2004 at 5 :00 p .m .
PDC COMMITTEE -Thursday, November 4 , 2004 at 5 :00 p .m.
GWR SYSTEM STEERING COMMITTEE -Monday, November 8 , 2004 at 5:30 p .m. @OCWD
FAHR COMMITTEE -Wednesday, November 10, 2004 at 5:00 p.m .
STEERING COMMITTEE -Wednesday, November 17, 2004 at 5:00 p .m .
To maintarn world-class lea dership m wa stewater and wat er resource management .
BOARD MEETING DATES
Board Meeting
*November 17, 2004
*December 15, 2004
January 26, 2005
February 23, 2005
March 23, 2005
April 27, 2005
May 25, 2005
June 22, 2005
*July 20, 2005
August24,2005
September 28, 2005
October 26, 2005
*Meetings are being held on the third Wednesday of the month
H:\dept\admin\BS\Agenda\2004 Meeting Notices\MN10.2.doc
!---=-~ "SJ~--::--*~~ ~----y.,... ..... ·~ Ii.:.'---• ._.,_;:c; .,.._ ·-..
;;=-~ ,,"t.cff;1~
...... 411 !!1!11
;di ._~,{I~
!i Welcome Nerissa! ,
f3 November 6, 2004, I 0 a.m. to 2 p.m . .. Newport Harbor Nautical Museum ;;m -(map on ba ck) :-r--:-.
~· .. ~ Ahoy Mate! L ~ ' =:;
I -=-OCSD invites you and your family to celebrate i and welcome its new ocean mo nitoring vessel -\
g Nerissa on Saturday, November 6tt.. She wi ll arrive -and be christened at 11 a.m . s harp, rain or shine, ~
~ at the museum's dock. . ~ ' • • Tour Nerissa ~
....,, • Meet the Captain a nd ocean monitoring crew
;..; .... • Learn more about OCSD's ocean monitoring '-!!:
I!:~
?"'41 program
-= ! • Explore the muse um 's many exhibits of nautica l
history -ship model ga ll ery and photography
~
I
~ • Guest appearance by CleanwaterWillie! ii
!iii
" I FREE FOOD & REFRESHMENTS ""~ ~ FREE PARKING & .......
ADMISSION TO MUSEUM --.
!!!!i
~ FUN EXHIBITS & ACTIVITIES :;;.
i; FOR KIDS OF ALL AGES!
r:.--.t --~ -~ Make Reservations by October 22 =-= Contact Laura Maravilla " :if!
Iii Communications Services Division
SI (7 14) 593 -7007
@ -
ii ~-ii
~
ti .....
!I
~
~
~ • ~
.;,.,~
,~
l -.:
~
a ~
~
Newport Harbor Nautical Museum
IS I Eas t Pacific Coast Highway
Newport Beach, CA 92660
(on the r iverboat in the Balboa Marin a)
www.nhnm.org (949) 673-7863
DIRECTIONS:
From LA/Anaheim : 40S South or S So uth to SS South to Pacific Coast Highway eastbound.
Pass Dover Dr. and make first right into Balboa Marina . Continue to the right.
From San Diego: 405 North to Jamboree South. Right on PCH westbound. Left on Bays id e
Drive then very first right into parking lot. Continue straight into Balboa Marina.
Los Angeles Daily News
OC takes up plan flushed by L.A.
By Kerry Cavanaugh
Staff Writer
Pagel ot3
Saturday, October 23, 2004 -Nearly five years ago, a $55 million water-reclamation project that Los
Angeles officials said would "drought-proof' the city was derailed by public outrage over the prospect
of drinking recycled toilet water.
Orange County residents had no such qualms.
Five months ago, Orange County broke ground on a $487 million "toilet-to-tap" project, slated to open
in 2007, purifying enough sewage water to serve for 140,000 families.
Far from being repulsed at the thought of drinking reclaimed water, though, residents there are boasting
they'll have dependable, cheaper water when imported supplies dry up and leave the rest of Southern
California parched.
While politics certainly played a role in the different outcomes --Los Angeles' project was quietly
launched in the middle of a mayoral campaign and while support was building for San Fernando Valley
secession --experts see Orange County's five-year public-education campaign as the determining
factor in overcoming the inherent "yuck" factor in toilet-to-tap systems.
"We started telling people from the start that we're purifying sewage water," said Ron Wildermuth, the
communications director for the Orange County Water District. "We have not had a group oppose the
project after they've listened to the project and the alternatives."
Orange County took their plan to the community, holding neighborhood pizza parties, water treatment
plant tours and hundreds of public meetings where they explained how sewer water would be purified
and then added to underground water supplies.
Public television personality Huell Howser was hired to narrate a video explaining how earthy-
smelling wastewater will be transformed into distilled, crystal clear water.
Politicians, initially skeptical of the project, were convinced to add their support.
"The thought didn't thrill me, to tell you the truth," U.S. Rep. Loretta Sanchez, D-Garden Grove, said
of her initial reaction to drinking purified sewage water. "I see at the federal level the fight over water.
We need to do something and after looking at the science I realize how lucky we are to be able to do
this project."
Los Angeles took a far different approach.
http://www.dailynews.com/cda/article/print/O, 1674,200% 7E31734% 7E2487056,00.html 10/26/2004
Page 2 of3
A water-recycling project was initiated in 1990 as a way to reduce Los Angeles' dependence on water
imported from the Owens Valley. But toilet-to-tap was mentioned merely as a possibility by city
officials in 1993, when they announced state funding for the effort.
Public hearings were held in 1991 and 1995, during the planning process. But otherwise, little public
attention was paid as the Department of Water and Power planned and built the East Valley Water
Recycling project --a system to pump 3.2 billion gallons of water from the Tilman Water Reclamation
plant in the Sepulveda Basin to the Hansen Dam spreading ground in Sun Valley.
There, it would filter through the pebbly soil into underground aquifers, and become part of the supply
that is pumped from wells, treated again, mixed with other water and piped to 70,000 households in the
East San Fernando Valley and Southeast LA.
The DWP was so low-key about the project that even then-Mayor Richard Riordan and some City
Council members said they were surprised when the agency announced in April 2000 that it was ready
to embark on the p~oject.
"They should have been far more candid on what was involved in the project. Reaching out means
reaching out in a clear way that people will understand," said Gerald Silver, president of the
Homeowners of Encino and a vocal critic of how the DWP handled the project.
In the face of public outrage, then-City Attorney James Hahn suspended the project, saying the DWP
had failed to adequately inform the public about its start-up and potential health risks. After he was
elected mayor in 2001, Hahn formally killed the toilet-to-tap project.
Current DWP officials say they still speculate whether a Orange County-style public outreach program
would have made a difference in Los Angeles.
"I often wonder if I should have done the i:nassive public relations campaign, like Orange County,"
DWP Water Services Manager Jerry Gewe said. "I was afraid I would create an issue where there
wasn't one. My feeling was we were better off to do it and we had the support of the political
leadership."
Former DWP general manager David Freeman --who in the days after the controversy erupted in
spring 2000 said he hadn't felt the need to tell Riordan the recycling project was about to begin --
blamed the demise of the program on front-page news stories about toilet-to-tap and turncoat city
political leaders.
"We were up against bigger mouths than us," Freeman said. "All it would take is some leadership to
explain this to people."
Freeman still maintains that Southern California needs a water-recycling effort to protect the region
during the next long-term drought and to replace the water Los Angeles is losing from the Colorado
River, the Owens Valley and Northern California.
There are signs that toilet-to-tap could make a comeback.
San Diego --which previously killed a toilet-to-tap project --is looking to expand its recycled-water
programs to communities that support the idea.
http://www.dailynews.com/cda/article/print/O, 1674,200% 7E31734% 7E2487056,00.html 10/26/2004
~
"'" Page 3 of3
Los Angeles is in the midst of a three-year planning project to meet the city's drinking water, storm
water runoff and recycled water needs. Recycled drinking water is among the options being considered
at the request of environmentalists.
"This is where we are going to be going in the next few years through the Sun Belt," said G. Wade
Miller, executive director of the Water Reuse Association. "There aren't any more virgin water
sources."
Gewe said the East Valley Water Recycling project can be resurrected at any time. DWP was
considering extending the existing pipeline to deliver treated sewage water for irrigating Hansen Dam
area golf courses.
"When we get to the point when we have a sustained drought and come up short, I suspect public
opinion will change," Gewe said. "The system is built --all we need is to turn it on."
Silver, the Homeowners of Encino president, said there could come a time when recycled water would
be acceptable for drinking, but only if residents understand and wholeheartedly endorse the program.
"My view is if the public wants it, they should drink recycled water if they choose to," he said.
Kerry Cavanaugh, (818) 713-3746 kerry.cavanaugh@dailvnews.com
http://www.dailynews.com/cda/article/print/0,1674,200%7E31734%7E2487056,00.html 1012612004
Proposed Changes in Reference to Agenda Item 16 of the Board Agenda
Package Regarding the Proposed Fats, Oils, and Grease (FOG) Ordinance
On October 25, 2004, the City of Tustin provided the District with comments
regarding the District's FOG Ordinance, opposing Article 8 -California Building
Standards Law Findings and Article 9 -Filing with California Building Standards
Commission and recommending removal from the proposed FOG Ordinance.
The City of Tustin provided the following core reasons:
• Articles 8 and 9 are inconsistent with other FOG Ordinances that have been
adopted in Orange County such ordinances include the County of Orange
and the City of Anaheim. Without these articles, the District's proposed FOG
Ordinance can stand alone, which in general, the District has the authority to
require property owners to install interceptors as a condition to permit
connection to its system; and
• In order to maintain a national building code and uniformity of these standards
within the building industry, local building chapters have strived for uniformity
by limiting and standardizing the amount of amendments to the adoption
process. Articles 8 and 9 of the District's proposed FOG Ordinance would
affect only the City of Tustin, which would hamper the intended goal of
maintaining uniformity.
In consultation with the District's General Counsel, staff agrees with the City of
Tustin and recommends to remove Articles 8 and 9 entirely from the proposed
FOG Ordinance. As a result of these changes, Article 1 O will be changed to
Article 8. These recommendations will not impact the main objective of the
proposed FOG Ordinance to enable the District to implement an effective FOG
Program. A redline copy of the original language of Articles 8, 9, and 10 is
enclosed.
I t0/ZZ/OI=Stl681#:Jd:sxo-S~M
'tS!:Jt9!0 at:tt U!l:IW"• At:1aele::1el pue aJ!I p:1eA69jes et A:Jessaoau
pue a1qeuese0:1 aq et puA6J a:1e pue 1e:1Apase:1d :1e a111te:Jts1u1tt1pe aq
et puA6J a:1e ape!) 6u1qtt1Ald e1u:10111e!J at:tt et suo11a1ap pue stuett1puatt10
1euemppv 'S±N3V\1(]f<J'.3V\1V 1WA03!)0Md 31\l±'v'M±SINIV\iOV '!)
·sat:1se0q 1eae1 a4t et U:10a:119tt11tep pu0 ,y,eUJ0Ae
at:tl JO "4!U!9!1• at8U7>atttttt! at:tt U!l:fWli 9!1EIAd at:tt je }49j89 pu0 t:1t1ea4
at:tt u0tea:Jt:1l l8l:ll SJ"l•e1iJa1'te tttatsAs :1aMas iuaA0:1d ei suene1A6a:1 aa11tap
1e:1tuea as00:16 l:lll•'"• aau011dU:1oa tS!:JtS at:tt 9:J!Aba:1 S!JO/tt\~ at:tt Aq p0seeltt1!
stuatt10::11Ab0:1 aB::let:ta9!P atsav. 1e:1aua6 at:tt l:ll!h'\ pa1dAea ueaso S!j!SEd at:tt
et •'\t!ttt!><e:1d 9,l9!:Jt9!0 041 pu0 pat:tS:JateM 0uv etues at:tt patea:1a 98l:f tBl:lt
At:1de:16ea6 pue ht:1de:16odot 9,l9!:Jt9!0 9l:f± :"e" ONV Nn ~0:1 Se>NIONl:I
·91uatt19:J!Ab0:1 aaueuatu1ett1 StJ!Sael9 0::1ott1 sat:t9!1EletSo
pU8 ape!) 6U!Eltt1Ald B!U:l6J!l8!) t 66Z at:tt JO 8' l> t 6 t UO!tsaS JO S:Jetdaa:JatU!
a9ea:16 :16J 9tuaU:19::l!Aba:1 aau0uatu1eU:1 1e::1aua6 a4t 9atJ1pott1 t> e1s1t:tv ·e
'ttt9t9A9 :1aMas a4t etu! pa6::1et:ta9!P 6u1aq t! Ol :1epd e>O:I 1e0::1t :1e tsanoo
:Je d8:Jt h11Aj99a99A9 et pUA6J 9! 99aao::1d :JO 1tt19!U8t:f9attt 'as1Aep :JSl:ftO
ou :J! 'ele:Jt as00::16 ::10 :1otdaa::1atu1 a900::16 e aq h8U:I l:fS!l:fl•'• 'es11.ap 1e:1t1:1eo
ase0::16 e ete:Jado pl:le 11Ct9l:I! ot 9ll:l8l:l:ll:l9!JEICt9~ a9!1\Jag poo3 ne 6U!:l!Al3a:1
hq ape!) 6U!Eltt1Ald B!U:l6J!IB!) t66Z at:tt JO t'l>t6t l:IO!t99S JO C?~!:JOl:ftAV
0l•!tB::ltS!l:l!tt1PV" 94t JO UO!J9:199!P pl:le •~!:Jet:ftA8 at:tt ~!POttl l> pue Z 9919!JJV 'V
'lt'\Olaq peq!:J99ap hllB9!j!Oads a:1ott1
9B p1:1e 'ue1ts!PS!JAf 9,l9!:Jl9!0 Bl:ft l:I! ~ade:Jd JO 9l:IO!t!PU09 1ea1t:1de:16eelot ::10 1es16e1oa6
'9!l8ttt!l9 ;te asA0aeq h:ie9saoa1:1 0:10 tt10::1at:1 patdope •ape!) 6u1qtt1Ald 8!l:l::IOJ!IB!J at:tt
hl:JBIA9!tJEd 0::1ott1 19J"l•e1 6u1sAOH pu0 sp:10p1:1eis 6U!Pl!A8 etets el:n et stua1:1:1p1:1at1:10 alft
lBl:lt 9Ptt!i Aq0:1at:1 p:eeoe &l:fl 't'IMl6t t ptie g·gget t 'eget t 'g· t l>68 t §§ 0po!J At9JBS p1:1e
l:lll8aH B!U:l6J!l8!) ':...09 9p:tepueis 6U!Pl!A8 B!U:IOJUC!) at:tt :JO 9Ue!9!AO:lel Ol:fl O} ll:IEA9:1Ad
S6NIONl!I iiffi SOt:IVONV:tS 6NI011nB VINt:IO:l11"iP~ 8 !11~1:1t:IV
t01zuo1=st16s1 #=fd:sxo-Sl?SM
'(t"Oget~
UO!t90S 0~0!) Al&JBS 18 1:mee1=1) N&BI etets Aq ~9J!Ab0J se (7.1808 94t :JO AJBt0J90S 0l:fl
.A;q tuewdo101.ea Al!UAWWO:J 13ue eu1sA01=1 :JO tuewtJefiea B!UJOJ!IB:J e4t ~ue uorssftl:JWO:J
s13:1e13uets BU!l31!A8 BfUJO:J!IB:J e4t 4t!l'• ~e1u eq 11e4s eoueu1P=Jo 9!4t :JO Ados v
NOISSIWINO~ StltiVtlN't'iS eN1a11ns VINltO::lllV~ Hiliv1 6Nlll=I 8 !11~1itiV
ARTICLE 40 8-EFFECTIVE DATE
This Ordinance shall take effect immediately upon its adoption and a summary shall be
published in a newspaper of general circulation as provided by law.
PASSED AND ADOPTED by the Board of Directors of Orange County Sanitation
District this day of 2004.
Attest:
Secretary of the Board of Directors
Orange County Sanitation District
Chair, Board of Directors
Orange County Sanitation District
Thomas L. Woodruff, General Counsel
Orange County Sanitation District
WS&S-OXS:pj:# 189145:10/22/04 3
No. 1 of 3
REPORT TO THE STEERING COMMITTEE
WEDNESDAY, October 27, 2004
1. Let me start by recognizing our Director from Huntington
Beach, Mayor Cathy Green. Hello Cathy. Would you like
to introduce the folks from Huntington Beach who are
accompanying you tonight.
2. We have another important guest with us tonight, but I will
leave the introduction to Blake ....
3. I am pleased to announce that Doug Davert will be seated
as the active director for the City of Tustin at tonight's
Board meeting. I have appointed him to the OMTS
Committee.
4. Mark your calendars for Saturday, November 5th. The
christening ceremony for the "Nerissa", our new Ocean
Monitoring Vessel will be held on Saturday from 1 Oam to
2pm. We will be celebrating Nerissa's addition to the
OCSD family at the Newport Harbor Nautical Museum.
1
You and your families are invited to join in the
celebration. The day will be filled with fun activities,
games, prizes and great grub! The cap'n and the crew
will be present to give you a tour of the boat. Please
notify Communications if you and your family will be
attending. Attendance is voluntary, this is not a
compensable event for Directors.
5. Due to the Thanksgiving Holidays, the Steering
Committee and Board will meet one week earlier next
month, on November 17th.
2
No. 2 of 3
CHAIR'S REPORT TO THE BOARD
BOARD MEETING OF
WEDNESDAY, OCTOBER 27, 2004
1. /J'First, I want to welcome back Don Bankhead from his
/I successful knee surgery and Blake from his successful heart
surgery. It is good to have you both back among us .
2. / I am pleased to announce that Doug Davert will be seated
as the active director for the City of Tustin at tonight 's Board
meeting . He is replacing Tony Kawash ima. I am also
appointing him to the OMTS Committee effective
immediately . Doug: welcome . If there is anything staff or I
can do to help you , please don 't hesitate to ask.
3. flhe standing committees will meet as follows in November:
OMTS Committee
PDC Committee
FAHR Committee
November 3rd
November 4th
November 1 oth
/The Cooperative Projects Grants Committee will be meeting on
November 2, 2004 at 11 :30 a.m.
3
/The Urban Runoff Ad Hoc Committee is scheduled to hold its
quarterly meeting on Wednesday, December 1st at 3:00 p.m.
/Due to the Thanksgiving Holidays, the Board will meet a week
earlier next month, on November 17th .
/
And finally , mark your calendars for Saturday, November 5th. The
christening ceremony for the "Nerissa 11
, our new Ocean Monitoring
Vessel will be held on Saturday from 1 Oam to 2pm . We will be
celebrating Nerissa 's addition to the OCSD family at the Newport
Harbor Nautical Museum . You and your families are invited to
join in the celebration . The day will be filled with fun activities,
games , prizes and great grub! The cap 'n and the crew will be
present to give you a tour of the boat. Please notify
Communicat ions if you and your family will be attending.
Attendance is voluntary , this is not a compensable event for
Directors.
4
N0.3of3
REPORT OF THE STEERING COMMITTEE
WEDNESDAY, OCTOBER 27, 2004 AT 5 P.M.
1. The minutes of the September 22, 2004 Steering Committee
meeting were approved as drafted.
2.
/
The General Manager updated the Steering Committee on
his meeting with SAWPA Acting General Manager, Daniel
Cozad who invited him to say a few words at his
Commission meeting last week. Mr. Cozad was in turn
invited to attend tonight's Steering Committee meeting.
3. The General Manager introduced representatives of the
Huntington Beach Visitors & Convention Bureau to the
Steering Committee. They requested that the Sanitation
District fund an advertising campaign to improve the image
of Orange County beaches and water quality. After
discussion, the Steering Committee 1?pAl __ fu'l.l,14-..._
.,/----/ v
1
/ ~~ iz=A IG ~ s~ ral~~
~ . . fitf ~ ~/ f2~1 ,TfotJ-<.Ar--/-d~d<
~ / r--, /Jvtl ?flt. ~£___(\--._ -~1---t,(}-n--i-..::dt(,
I
5
4. vfhe General Manager briefed the Steering Committee on the
impact of last night's storm. The bottom line : we are in good
shape.
5 . He also mentioned that temporary repa irs for the SARI line
will occur as soon as the flow in the river subsides. The cost
)
will be approximately $3Cl0,ecr0. (l )-S-,cJu G
~
~eneral Counsel reported on
s:
7 On the subject of Legislative Affairs Comm ittee and our
efforts to secure additional funds for secondary treatment -
at the moment , Congress and the nation are preoccupied
with other matters.
8 Dr. Ghirelli reported the Governor's California Performance
Review (CPR) has completed its hearings and prepared a
report that represents the preliminary analysis and findings
of the CPR Commission Staff.
6
9. e November agenda items for the working committees
10.
were eviewed.
s scheduled for consideration at tonight's
Board meeting wer reviewed.
11. The Steering Committee en d in closed session on four
matters: Executive Managemen Team Compensation and
Benefit Percentage Adjustment , tw matters of pending
litigation, and one matter of anticipate itigation .
7
October 25, 2004
TO:
FROM:
MEMORANDUM
Chair and Members of Board of Directors
Orange County Sanitation District
Blake P. Anderson '~A-
General Manager, Orange County Sanitation District
SUBJECT: Wet Weather Issues and OCSD Assistance
The purpose of this letter is to help you help us reduce excess flows that may come into
the sanitary sewers during heavy rain events. One easy way OCSD can assist your city
or agency is to provide rubber stoppers and duct seal putty to your staff, at no cost, to
plug open manhole cover vent holes and seal manhole cover rings to prevent inflow
during heavy rain events.
You can also purchase and install manhole inserts to prevent inflow from rainfall.
Manhole inserts are bowl shaped and are put in the manhole right below the cover.
The bowl does not allow the stormwater to enter the sewer. OCSD plugs and seals its
covers.
In addition, during heavy rains in the past, some city and agency personnel have
purposely removed manhole covers to help storm water drain away faster from flooded
intersections. This is both dangerous and ill-advised.
As a reminder, OCSD Ordinance No. OCSD-01, Section 203, specifically prohibits the
discharge of surface water, ground water or subsurface drainage into the sanitary
sewer unless the discharger has obtained a Special Purpose Discharge Permit. Such
practices also violate Waste Discharge Requirements Order RB-2002-0014 that we all
must follow.
Please contact Patrick McNelly of our staff to coordinate any assistance you might
need. Patrick can be reached at: (714) 593-7163 or by email at: pmcnelly@ocsd.com.
Another good preventive measure is to replace standard sanitary sewer manhole
covers in low areas, such as gutter flow areas and areas prone to standing water, with
watertight sealed covers. Many manhole covers have holes in them to allow venting.
These holes, especially for manhole covers that are located in low lying areas, allow
significant amounts of stormwater to enter the sewer system.
Page2
October 25, 2004
As you may be aware, a mild El Nino is forming in the Pacific. While meteorologists are
still uncertain what this will mean for our weather later this winter, we need to plan for all
contingencies, such as the significant rainfall that fell in some parts of the region
between October 17 and 20.
During this recent unseasonable storm, OCSD flows peaked at approximately 480
million gallons a day, which is double our average daily flow. This excess flow in the
collection system and at OCSD's treatment facilities can cause sanitary sewers to
surcharge and overflow, causing raw sewage to spill into the street and/or back up onto
private property. While such events are rare, they have happened.
Cleanouts on private property laterals that are uncapped are another common source
of inflow, especially those that are below the existing ground surface. These can cause
large quantities of surface water to enter the sewer system. Uncapped cleanouts are
usually discovered by field inspection (smoke testing) and are simple to remedy. These
cleanouts should be capped with screw type caps that are water tight. Smoke testing
can also be used to discover illegal connections from gutters or yard surface drains to
the sanitary sewer.
While we certainly need more rain in Southern California, we also need to work
together to minimize inflow and infiltration into the sanitary sewer system during heavy
rains. Together we can help prevent sanitary sewer overflows and excess flows to our
treatment plants, and comply with our regulatory requirements.
BPA:gg
C: P. McNelly
N. Arhontes
T. Woodruff
H:\dept\admin\110\ANDERSON BLAKE\Corres04\102504 Wet Weather Issues ltr to Board.doc
,,.
~
MEMORANDUM
TO: OCSD Board of Directors
FROM: Bob Ghirelli
SUBJECT: Legislative Advocacy
In response to Director Christy's request, please find attached two fact sheets regarding
the District's legislative initiatives. You may find the information useful when speaking
with members of Congress, particularly the members of the Orange County delegation.
In summary, the overall message that OCSD is attempting to convey to the
Congressional Delegation can be summed up in three points:
1. Congress must boost national spending on clean water infrastructure.
2. In particular, Congress must support funding Clean Water Act State
Revolving Loan Fund Program (SRF) at a minimum of $1.35 billion in FY
2005.
3. The SRF program supports OCSD's secondary treatment project and other
regional water projects vital to our communities.
Attachment 1 contains bullet points for federal support for water quality infrastructure
assistance in fiscal year 2005.
Attachment 2 is a one page fact sheet developed as a handout for discussing
secondary funding requirements with federal legislators.
If you have any questions regarding these documents, please contact me at
rghirelli@ocsd.com or 714.593.7400.
OCSD + P.O. Box 8127 + Fountain Valley, CA 92728-8127 + (714) 962-2411
TALKING POINTS
FEDERAL SUPPORT
WATER QUALITY INFRASTRUCTURE ASSISTANCE
FISCAL YEAR 2005 APPROPRIATIONS
• Congress has recessed for the elections. It will return to address unfinished business on November 15.
• The hope is that final federal agency spending bills, including the Veterans, Housing and Independent
Agencies spending bill that includes funds for the U.S. Environmental Protection Agency, will be
developed as part of an omnibus spending package, avoiding the need for another stopgap spending bill that
would delay final spending decisions until January ofnext year.
• Regardless of the budget negotiation outcome in November, it is clear that Congress must take action to
boost spending ofEPA's Clean Water Act State Revolving Loan Fund Program (or SRF program).
• This program supports special needs, such as Orange County Sanitation District's secondary treatment
compliance project, by providing project specific earmarks.
• Currently, a debate over how much to fund the program is underway in Congress.
• Last year, approximately $1.35 billion was provided. Included within this amount was funding for special
project needs like OCSD's. The overall funding was for the loan program referred to as the SRF program.
However, the higher the level of funding for the SRF program, the better the opportunities for Congress to
fund special projects' needs at higher levels.
• It is important that Congress provided, at a minimum, current year spending for the SRF program ($1.350
billion). This level will allow ongoing construction projects such as OCSD's secondary treatment program
to receive adequate federal support to comply with federal mandates.
• A maximum level of SRF program funding in fiscal year 2005 could be used in the amount of $5 billion,
the budget realities suggest that a minimum acceptable level of funding support must not fall below current
year levels.
OCSD t P.O. Box 8127 t Fountain Valley, CA 92728-8127 t (714) 952-2411
ORANGE COUNTY SANITATION DISTRICT
FISCAL YEAR 2005
COMPLIANCE WITH CLEAN WATER ACT SECONDARY TREATMENT STANDARD
KEY POINTS:
• OCSD received a $I million eannark in FY 2004. The House Committee on Appropriations has approved
an earmark of $700,000 as part of the FY 2005 U.S. EPA's budget. The Senate has yet to act on U.S.
EPA 's budget
• OCSD will invest approximately $400 million over the next decade to build secondary treatment facilities
in addition to the $2.1 billion in planned infrastructure projects to improve and rehabilitate our aging
treatment plants and sewer system.
• It is imperative that continued federal assistance is provided to OCSD as it was to other large urban coastal
communities including Los Angeles, San Francisco, Seattle, and Boston. These communities, like OCSD,
were faced with identical infrastructure improvement needs and received substantial federal support to meet
their federal environmental mandates.
• The cost of completing secondary treatment is significant. Rates will be raised each year for five years
resulting in a doubling of sewer fees for each resident and business in the Orange County service
area. Federal assistance will demonstrate to the ratepayers that the federal government is a partner in the
effort to improve water quality and beach recreation.
• Over the next two years, the Orange County Sanitation District will lose $17 million in funds to the State of
California as a direct result of the large state budget deficit. 40 percent of the property tax funds allocated
to OCSD will be taken by the state.
• OCSD will soon receive its revised federal ocean discharge permit and sign a federal consent decree
requiring specific milestones be reached to ensure it reaches secondary treatment standards compliance by
the year 2013.
RECOMMENDED ACTION:
On behalf of the Orange County Sanitation District (OCSD), we are seeking your continued active support and
leadership to improve the quality of our County's coastal waters. OCSD is seeki11g $10 million in federal funding
support in Fiscal Year 2005 to maintain progress in the construction of additional treatment facilities to meet the
requirements of the Clean Water AcL We would respectfully request that you urge Ranking Member Mikulski or
Chairman Walsh to make this project a top priority.
FOR MORE INFORMATION:
Visit the Website: www .ocsd.com.
Additional Contacts:
> Robert Ghirelli, Director of Technical Services, 714-593-7400, rghirelli@ocsd.com
> Carol Beekman, Director of Communications and Administrative Services, 714-593-7120,
cbeekman@ocsd.com
> Eric Sapirstein, ENS Resources, 202-466-3755, esap@ensresources.com
ORANGE COUNTY SANITATION DISTRICT
PERIOD: September 1, 2004 -September 30, 2004
TO: PDC Committee
FROM: David A. Ludwin, P.E.
Director of Engineering
STAFF CONTACT: Larry Rein
CONSTRUCTION PROGRESS
• Yorktown/Bushard Intersection:
o Completed installation of 15-inch City sewer siphon, 60-feet of 60-inch RCP,
north junction structure, and road restoration on north side of intersection.
Opened up the north half and closed the south half of the intersection on
September 27, 2004. The estimated completion of the south closure work is the
last week of November, 2004
• Bushard between Drumbeat Drive and South of Hamilton:
o Work continued on road restoration and removal and replacement of sidewalk,
curb and gutter. Discovered two cracked bells between Drumbeat and Hamilton.
Moved large equipment across Hamilton in preparation for the north closure.
The estimated completion is the first week of October, 2004.
• Bushard between Banning and Drumbeat Drive:
o Completed street restoration except for the final paving course and striping. This
work will be completed when the north side of Hamilton work is completed,
around the end of November.
• Summary Progress to Date
o 108-inch Pipe: 5,815 ft of pipe have been installed. The alignment starts at Plant
No. 2 Main Entrance on Brookhurst and continues north on Brookhurst to
Banning, then turning west on Banning to Bushard, then turning north on
Bushard. Pipe has been installed up to the middle of Hamilton/Bushard
intersection.
o Intersection work: Work at the following intersections with Bushard has been
completed: Hamilton (south side only), Atlanta, Indianapolis, Adams, Yorktown
{north side only) and Fountain Valley Channel Crossing.
o City sewer work: 21/27-inch sewer was installed along Bushard between Banning
and Atlanta. An 8-inch sewer was installed on Cape May Drive.
o Plant No. 2 Work: Restoration of main entrance is completed and lining of
existing 54-inch pipe inside Plant No. 2 is completed.
o At the current rate of progress, project is projected to be completed in April,
2007.
TECHNICAUPROBLEM SOLVING ISSUES:
• Submlttals Reviews
o A revised submittal was received on September 8, 2004 for the balance of the
108-inch pipe. This design is a replacement for the previous design that earlier
pipe was manufactured to and OCSD said they would not accept for new pipe.
OCSD asked for additional information on September 13, 2004 and Rados
furnished a response to this request on September 17, 2004. OCSD requested
additional information and a response to questions on September 27, 2004. On
September 29, OCSD met with Rados and the pipe supplier and reached
agreement on what needed to be revised in the pipe submittal. This revised pipe
submittal was received October 6, and is under review.
o A revised submittal for the 96-inch RCP was received September 22, 2004. The
submittal is under review.
COMMUNITY OUTREACH/ PUBLIC CONCERNS:
• Construction Notifications
o Bushard closure from Hamilton to Panacea for two months -distributed
September 29, 2004 for road closure beginning October 2, 2004.
o South Yorktown/Bushard closure for 3 months -distributed September 23, 2004
for road closure beginning September 27, 2004.
• Letters
o None
• Neighborhood Meetings
o None
• Weekly Updates (4)
o September 3, 2004
o September 10, 2004
o September 17, 2004
o September 24, 2004
• Outreach Activities Summary to Date
o Seven community meetings
o Regular weekly web updates beginning July 2, 2004
• The latest web update was September 24, 2004
o 35 notifications were sent.
• Approximately 97,000 pieces distributed
• Property Damage Complaints
o OCSD has received a total of forty six damage complaints however, AIG has
received a notification of additional claims represented by a legal firm that OCSD
was not aware. The complaints are being reviewed and processed by AIG
(Rados insurer at the time the alleged damage occurred}. David Morse & Assoc.
has been hired by AIG as a third party adjuster to determine the validity of the
claims. To date no additional claims have been settled or denied by AIG. David
Morse is in the process of making second inspections in order to make
recommendations to AIG.
• Other Public Concerns Noted
o Dust Control: The Contractor has been directed continuously to mitigate dust at
the construction areas.
o The Contractor has been directed continuously to not start work prior to 7:00 a.m.
LEGAL ISSUES AND CONCERNS:
• Homeowner Claims
o Seven homeowners have declined Inspections of property damage claims
because they have obtained legal counsel.
o A news article was published in the Huntington Beach Independent on
September 30, 2004 indicating that a lawsuit had been filed against the Orange
County Sanitation District. As of October 6, 2004 there was no record of a lawsuit
filed with the Orange County Superior Court.
• Liquidated Damages
o Overall project liquidated damages have been accruing from March 27, 2004 at
the rate of $2,000 per calendar day for a total of $370,000.
o Specific Site work liquidated damages were accrued for work on Adams
Boulevard from December 8, 2003 until June 22, 2004 at $1,200 per calendar
day for a total of $235,200.
o There are actual delays that are allowable per contract that will reduce liquidated
damages. The duration of these delays has not yet been agreed to.
• Summary to Date of Legal Issues
LR:ba
o Rados has notified the District of claims for delay damages arising out of
problems with the 108-inch pipe and of claims from its subcontractors and
suppliers arising out of 108-inch pipe problems. The District has denied any
responsibility for such damages.
o Rinker has submitted a stop notice in the amount of $1,710,802for108-inch pipe
manufactured but not paid for by the District. Rados has submitted a stop notice
release bond covering 125% of Rinker's stop notice amount. Accordingly, the
District need not withhold any monies for the Rinker stop notice.
o Consultants
o The pipe consultant retained by the General Counsel's office continues to
assist staff and the General Counsel's office with technical issues and
liability questions.
o The geotechnical consultant retained by the General Counsel's office is
proceeding with its analysis of the dewatering and vibration study to
address allegations of damage to adjacent properties. The final report
will be made available to the public for review in October.
.·
Following this page are notifications
and Web updates that were distributed from
September 1, 2004 to September 30, 2004.
..
STARTING:
DURATION:
WHAT:
WHERE :
Orange County Sanitation District
CONSTRUCTION NOTIFICATION
Monday September 27, 2004
Approx. 3 months
Road Closure for Bushard Trunk Sewer Replacement Project
Bushard Street from Yorktown Avenue to Pettswood Drive .
YORKTOWN AV I
3 ~~ >
I I I a: ii ::>
"' ~'-a: ~ ~ 3: NAHT\JCKET D R WOODLAWN DR
~ I
c ) 0::
~
Cl) r ::::> I al PETTSWOOO DR
N
This construction is part of the Orange County Sanitation District's (OCSD) Bushard
Trunk Sewer Project which is replacing a major, aging sewer p ipeline .
Please be assured that OCSD has planned construction activities in a manner that will
minimize the impact to you . Traffic detours will be provided and clearly marked .
During this phase of construction, Bushard will be fully closed to traffic between
Yorktown Avenue and Pettswood Drive. Traffic coming from Yorktown Avenue will
have access to the neighborhood via Waterbury Lane and Rockland Lane . Pettswood
Drive will be open to thru traffic but Nantucket Drive and Woodlawn Dr will be closed .
These closures and detours will remain in place 24 hours a day. Traffic traveling both
east and west on Yorktown Avenue will be able to continue through the intersection , but
turns onto Bushard will be restricted.
Construction is scheduled to occur weekdays from 7 a.m. to about 4 p.m . Occasionally
work may continue past 4 p.m. but will be confined to the closed areas. When crews
finish each day, any open trenches will be barricaded or fenced . The safety and welfare
of our residents is a priority to all of us at OCSD. If you have any questions , please call
the Construction Hotline at (714) 378-2965.
For further information about the project, or to sign up fore-Subscriptions to get regular
updates on projects near you , please visit our website at www.ocsd .com .
Again, thank you for your patience during this period.
STARTING:
DURATION:
WHAT:
WHERE:
Orange County Sanitation District
CONSTRUCTION NC>TI Fr lCA TION
Week of October 4 , 2004
Approx. 2 months
Road Closure for Bushard Trunk Sewer Replacement Project
Bushard Street from mid -Hamilton Avenue to Panacea Drive
·: ATLANTA AV
This construction is part of the Orange County Sanitation District's (OCSD) Bushard
Trunk Sewer Project which is replacing a major, aging sewer pipeline.
Please be assured that OCSD has planned construction activities in a manner that will
minimize the impact to you. Traffic detours will be provided and clearly marked .
During this phase of construction, Bushard will be fully closed to t raffic between
mid-Hamilton Avenue and Panacea Drive. Traffic coming from Hamilton Avenue will
have access to the neighborhood via Northshore Lane and Spyglass Lane . Waterfront
Drive will be completely close to thru traffic. These closures and detours will remain in
place 24 hours a day. Traffic traveling both east and west on Hamilton Avenue will be
able to continue through the intersection , but turns onto Bushard will be restricted .
Construction is scheduled to occur weekdays from 7 a .m. to about 4 p .m. Occasionally
work may continue past 4 p.m. but will be confined to the closed areas. When crews
finish each day, any open trenches will be barricaded or fenced. The safety and welfare
of our residents is a priority to all of us at OCSD. If you have any questions , please call
the Construction Hotline at (714) 378-2965.
For further information about the project, or to sign up fore-Subscriptions to get regular
updates on projects near you , please visit our website at www.ocsd .com .
Again, thank you for your patience during this period.
From: forinformatJon@ocsd.com
Sent: Friday, September 03, 2004 8:36 AM
To:
Subject: OCSD Bushard Weekly Update -Sept 3 -Sept 10
Bushard Street -108-inch pipe installation and removal and replacement of 12-inch
waterline:
Banning Ave and Drumbeat Drive intersection:
.Bushard is open to traffic between Banning Ave and Drumbeat Dr .
. Street restoration will continue from Landfall to Drumbeat Drive .
. Work estimated to be complete the first week of October .
. Street restoration is 88 percent complete.
Drumbeat Drive and mid-Hamilton intersection:
.Bushard is closed to thru traffic between Drumbeat Dr and south-Hamilton intersection .
. During this week installation of the 108-inch pipe will continue .
. Work estimated to be complete the first week of October .
. Work is so percent complete.
North Yorktown and Bushard Intersection -60-inch sewer installation and 15-inch city
sewer installation:
.Construction continues at the North Yorktown/Bushard intersection .
. Installation of 60-inch pipe at the north side of the intersection was completed .
. Construction of transition structure is in progress .
. Work estimated to be complete the first week of October .
. This portion of work is 70 percent complete.
Please visit http://www.ocsd.com/civica/filebank/blobdload.asp?BlobID=3975 for an updated
Construction Map.
If you have any questions please call the Construction Hotline at
(714) 378-2965.
If you would like to be removed from this distribution list please reply back to this e-
mail.
1
I-
C/)
< ::;
0 z
~
::!:
_,
I u
!;:
w ID _,
~
Orange County Sanitation District
Bushard Trunk Sewer Construction Project
Weekly Status Update -September 3, 2004
•·-~L'-...
ul f
z •
ELLIS AV ~I
>·
j
FOLl'l AIN r,···--:
GARFIELD AV
INDIANAPOLIS AV
ocso
PLANT
N0.1
• Installed 108-inch P ipe and
Completed Intersection Structures
• I Current Construction Areas
B I Upcoming Constructi on Area s
FOR MORE INFORMATION
CALL CONSTRUCTION
HOTLINE (714) 378-2965
Current Yorktown I Bushard Intersect ion Work
Installation of 15-inch City Sewer Siphon and 60-inch
Pipe.
Estimated Completion: First week of October, 2004.
North Closure: Construction will occur on the North
side of Yorktown I Bushard intersection.
Bushard fully c losed between Mid-Yorktown Avenue
to Bass Drive intersection.
Upcoming Yorktown I Bushard
Installation of 60-inch Pipe.
Estimated start: First w eek of October, 2004.
Bushard St. will be fully clos ed between Mid-
Yorktown Ave and Pettswood Dr Intersection.
Upcomi ng 108-inch Installation
Installation of 108-inch pipe.
Estimated Start : First week of October, 2004.
Bushard St. will be fully closed between Mid -
Hamilton Ave and Panacea Dr Intersection.
Current Hamilton I Bushard Intersecti on Work
Installation of 108-inch pipe and removal and
replacement o f 12-inch wat erline.
Estimated Completion: First week of October, 2004.
South Closure: Construction will occur
on the South side of Hamilton I Bushard intersection.
Bushard fully closed between Drumbeat Drive and
South-Hamilton A venue intersection. Traffic on
Hamilton Ave was restored, but closure remains.
From: forinformation@ocsd.com
Sent: Thursday, September 09, 2004 2:30 PM
To:
Subject: OCSD Bushard Weekly Update-Sept 10 -Sept 17
Bushard Street -108-inch pipe installation and removal and replacement of 12-inch
waterline:
Banning Ave and Drumbeat Drive intersection:
.Bushard is open to traffic between Banning Ave and Drumbeat Dr .
. Street restoration will continue from October 4, 2004 to October 25, 2004 from Landfall
to Drumbeat Drive .
. Street restoration is 88 percent complete.
Drumbeat Drive and mid-Hamilton intersection:
.Bushard is closed to thru traffic between Drumbeat Dr and south-Hamilton intersection .
. During this week installation of the 108-inch pipe will continue .
. Work estimated to be complete by October 4, 2004 .
. work is 60 percent complete.
North Yorktown and Bushard Intersection -60-inch sewer installation and 15-inch city
sewer installation:
.Construction continues at the North Yorktown/Bushard intersection .
. Construction of transition structure is in progress .
. This portion of work is 80 percent complete.
Please visit http://www.ocsd.com/civica/filebank/blobdload.asp?BlobID=3982 for an updated
Construction Map.
If you have any questions please call the Construction Hotline at
(714) 378-2965.
If you would like to be removed from this distribution list please reply back to this e-
mail.
1
...
"' < :::;
0 z
Cl < :E
Orange County Sanitation District
Bushard Trunk Sewer Construction Project
Weekly Status Update -September 10, 2004
ELLIS AV
> ~I
j
FO\J'I AIN r
GARFIELD AV
ocso
PLANT
N0.1
• Installed 108-inch Pipe and
Completed Intersection Structures
• I Current Construction Areas
E) I Upcoming Construction Areas
FOR MORE INFORMATION
CALL CONSTRUCTION
HOTLINE (714) 378-2965
Current Yorktown I Bushard Intersection Work
Installation of 15-inch City Sewer Siphon and 60-inch
Pipe.
Estimated Completion: September 27, 2004 .
North Closure: Construction will occur on the North
side of Yorktown I Bushard intersection .
Bushard fully closed between Mid-Yorktown Avenue
to Bass Drive intersection.
Upcoming Yorktown I Bushard
Installation of 60-inch Pipe.
Estimated s ta rt: September 27, 2004.
Bushard St. will be fully closed between Mid-
Yorktown Ave and Pettswood Dr Intersecti on.
Upcoming 108-inch Installation
Installation of 108-inch pipe.
Estimate d Start: October 4 , 2004.
Bushard St. w i ll be fully closed between Mid-
Hamilton Ave and Pan acea Dr Intersection .
Current Hamilton I Bushard Intersection Work
Installation of 108-inch pipe and removal and
replacement of 12-inch waterline.
E s timated Completion: October 4, 2004.
South Closure: Construction will occur
on the South side of Hamilton I Bushard intersection.
Bushard fully closed between Drumbeat Drive and
South-Hamilton Avenue intersection. Traffic on
Hamilton Ave was restored, but closure remains.
From: forinformation@ocsd.com
Sent: Friday, September 17, 2004 1 :11 PM
To:
Subject: OCSD Bushard Weekly Update-Sept 17-Sept 24
Bushard Street -108-inch pipe installation and removal and replacement of 12-inch
waterline:
Banning Ave and Drumbeat Drive intersection:
.Bushard is open to traffic between Banning Ave and Drumbeat Dr .
. Sidewalk restoration from Landfall Dr to Drumbeat Dr is estimated to be complete by the
end of October, 2004 .
. Street restoration is 90 percent complete.
Drumbeat Drive and mid-Hamilton intersection:
.Bushard is closed to thru traffic between Drumbeat Dr and south-Hamilton intersection .
. Installation of the 108-inch pipe is completed and street restoration work is in
progress .
. Sidewalk restoration work will continue after October 4, 2004, but the traffic closure
will be switched to the north side of the intersection .
. Work is 80 percent complete and estimated to be complete by October 4, 2004.
North Yorktown and Bushard Intersection -60-inch sewer installation and 15-inch city
sewer installation:
.Construction continues at the North Yorktown/Bushard intersection .
. Installation of 60-inch pipe at the north side of the intersection was completed .
. Installation of 108/60-inch transition structure was completed .
. Work estimated to be complete by September 27, 2004 and traffic closure will be switched
to the south side .
. This portion of work is 85 percent complete and street restoration work is in progress.
Please visit http://www.ocsd.com/civica/filebank/blobdload.asp?BlobID=3999 for an updated
Construction Map.
If you have any questions please call the Construction Hotline at
(714) 378-2965.
If you would like to be removed from this distribution list please reply back to this e-
mail.
1
' I
J ---+----L~
Orange County Sanitation District
Bushard Trunk Sewer Construction Project
Weekly Status Update -September 17, 2004
u:: z
~
ELLISAV iJ I
>-~ ~,
FQV< AI N
GARFIELD AV
OCSD
PL.ANT
N0.1
• Installed 108-inch Pipe and
Completed Intersection Structures
• I Current Construction Areas
m I Upcoming Construction Areas
FOR MORE INFORMATION
CALL CONSTRUCTION
HOTLINE (714) 378-2965
Current Yorktown I Bushard Intersection Work
Installation of 15-inch City Sewer Siphon and 60-inch
Pipe.
Estimated Completion: September 27, 2004.
North Closure: Construction will occur on the North
side of Yorktown I Bushard intersection.
Bushard fully closed between Mid-Yorktown Avenue
to Bass Drive intersection .
Upcoming Yo rktown I Bushard
Installation of 60-inch P i pe.
Estimated start: September 27, 2004.
Bushard St. will be fully closed between Mid-
Yorktown Ave and Pettswood Dr Intersection.
Upcoming 108-i nch Installat ion
Installation of 1 OB-inch pipe.
Estimated Start: October 4, 2004.
Bushard St. will b e fully closed b etween Mid-
Hamilton Ave and Panace a Dr Intersection.
Current Hami lton I Bushard Intersection Work
Installation of 108-inch pipe and removal and
replacement of 12-inch waterline.
Estimated Completion: Octobe r 4, 2004.
South Closure : Construction will occur
on the South side of Hamilton I Bu s hard intersection.
Bushard fully closed between Drumbeat Drive and
South-Hamilton Avenue intersection. Traffic on
Hamilton Ave w as restored , but closure remains.
From: forinformation@ocsd.com
Sent: Thursday, September 231 2004 3:24 PM
To:
Subject: OCSD Bushard Weekly Update -Sept 24 -Oct 3
Bushard Street -108-inch pipe installation:
Banning Ave and Drumbeat Drive intersection:
.Bushard is open to traffic between Banning Ave and Drumbeat Dr .
. Street restoration is 91 percent complete .
. Sidewalk restoration from Landfall Dr to Drumbeat Dr is estimated to be complete by the
end of October, 2004.
Drumbeat Drive and mid-Hamilton intersection:
.Bushard is closed to thru traffic between Drumbeat Dr and south-Hamilton intersection .
. Installation of the 108-inch pipe is completed and street restoration work is in
progress .
. Work is 85 percent complete and estimated to be complete by October 4, 2004 .
. Sidewalk restoration work will continue after October 4, 2004, but the traffic closure
will be switched to the north side of the intersection.
Bushard Street -Intersection work:
North Yorktown and Bushard Intersection -60-inch sewer installation and 15-inch city
sewer installation:
.This portion of work is 100 percent complete and the traffic closure will be switched to
the south side on Monday September 27, 2004.
South Yorktown and Bushard Intersection -60-inch sewer installation:
.Traffic closure will be implemented on Monday September 27, 2004 .
. Bushard will be closed to thru traffic between Pettswood Dr and south-Yorktown
intersection .
. The work performed will include temporary traffic control, detour set-up, installation of
dewatering wells and trench excavation for 60-inch pipe installation.
Please visit http://www.ocsd.com/civica/filebank/blobdload.asp?BlobID=4024 for an updated
Construction Map.
If you have any questions please call the Construction Hotline at
(714) 378-2965.
If you would like to be removed from this distribution list please reply back to this e-
mail.
1
1-
Ul
c( ::;
0 z
(!)
c(
:::E
Orange County Sanitation District
Bushard Trunk Sewer Construction Project
Weekly Status Update -September 24, 2004
ELLIS AV
> w
:;j
~
FOU'I AJN
GARFIE ~DAV
OCSD
PLANT
N0.1
• Installed 108-inch Pipe and
Completed Intersection Structures
• I Current Construction Areas
I Upcoming Constructi on Areas
FOR MORE INFORMATION
CALL CONSTRUCTION
HOTLINE (714) 378-2965
Current Yorktown I Bushard Intersection Work
Installati on of 15-inch City Sewer S i phon and 60-inch
Pipe.
Estimated Completion: September 27, 2004.
North Closure : Construction will occur on the North
side of Yorktown I Bushard i ntersecti on.
Bushard fully close d between Mid-Yorktown Avenue
to Bass Drive intersection.
Upcoming Yorktown I Bushard
Installation of 60-inch Pi p e.
Estimated start: September 27, 2004 .
Bushard St. will be fully closed between Mid·
Yorktown Ave and Pettswood Dr Intersection.
Upcoming 108-inch Installation
Installation of 108-inch pipe.
Estimated Start: October 4, 2004.
Bushard St. w ill be fully closed between Mid-
Hamilton Ave and Panacea Dr Intersection.
Current Hamilton I Bushard Intersection Work
Installation of 108-inch pipe and removal and
replacement of 12-inc h waterline.
Estimated Completion: O ctober 4 , 2004.
South Closure : Construction will occu r
on the South side of Hamilton I Bushard intersection.
Bushard fully closed between Drumbeat Drive and
South-Hami lton Avenue intersection. Traffic on
Hamilton Ave was restored, but closure remains.
~ Ki01berly-Clark
October 26, 2004
Board of Directors
Orange County Sanitation District
10844 Ellis Ave.
Fountain Valley, CA 92708
Dear Board Member,
Fullerton Mill
The purpose of this letter is to raise concerns related to the proposed Class I, Class 11 and
Special Purpose Permittee rates being presented at the October 27, 2004 Board meeting.
As you may recall, a Kimberly-Clark representative spoke in opposition to an earlier rate
increase proposal during the public comment sessions at the July 21, 2004 OCSD Board
of Director's meeting. Based in part on the concerns raised at that meeting, the Board
delayed further consideration.
Since that meeting, Kimberly-Clark and other permittee representatives have worked with
the OCSD staff to better understand the basis for these proposed increases. Despite
those efforts, many important questions remain unresolved. Some of these questions
include:
• The original proposed rate increase presented to the Board was intended to
correct an error made in the 1999 rate setting process which resulted in permittees
receiving double credit for property tax revenues paid to the district by these users.
However, permit users did not see any rate decrease in 1999 as a result of this
error, as rates actually increased. Permit user rates have continued to increase
approximately 15% per year in each subsequent year as well. Was the rate
structure already adjusted in 1999 and beyond to compensate for the property tax
impact?
• Data in the rate increase proposal package indicates that the permit user group
provides about $900,000 in property tax revenues to the district, yet the rates
proposed are indicated to increase revenues by $1.8 million. Is there an
explanation for this apparent discrepancy?
• As part of discussions with OCSD staff it was determined that in the 1999 rate
setting process many capital projects were erroneously included in the
determination of permit user rates. Rather than just adjusting rates to correct for
this, the district staff elected to revise the rate structure to include all capital
projects that had been added since the 1999 rate setting process. This included
significant capital requirements resulting from the adoption of requirements for full
secondary treatment and for the Ground Water Replenishment System (GWRS).
While these additional costs are for projects which serve all OCSD users, the rate
revision process has only been applied to the permit user group. Based on
standard rate-making principles, shouldn't the cost of these capital projects apply
to all classes of user rates?
Kimberly-Clark Worldwide. Inc.
2001 Orangethorpe Avenue Fullerton, California 92831-5396
(714) 773-7500
..... ,
O.C.S.D.
October 26, 2004
Page2
• The permit rate structure, as revised to include added capital needs, now
increases costs to permit users by $4, 100,000. These revised rates are being
presented to the Board tonight for consideration. Included in these rates are
significant allocations based on subjective judgement. For example, these rates
attribute 36% or $67 million dollars of cost for the GWRS to the permit users. The
GWRS is an additional capacity project, in lieu of constructing a second ocean
outfall system. Why is a significant part of an expansion project included in
determining the permit user rate structure? Have other projects been
inappropriately included?
Clearly, the rate setting process is complex and depends, in large part, on a series of
estimates and assumptions. As has been demonstrated, this process has a real potential
for errors; as well as for significant differences related to the validity of estimates and
assumptions. Significant adjustments, such as the one proposed here, should not be
made in isolation but should only be done as part of a comprehensive review of the entire
rate structure. Furthermore, this full rate review should involve an independent
consultant; in a process open to full public scrutiny and comment.
The changes being proposed tonight will increase permit user rates in aggregate by 56%
above 2003-04 rates, raising costs for permit users by over $4. 1 million in the first year.
For Kimberly-Clark's Fullerton Mill the actual increase is 78%, raising our costs by
$216,000 in the first year. The OCSD staff report also suggests that rates will continue to
escalate above these levels at a rate higher than 15% per year through 2007-08.
We have already commented on the huge negative effect these dramatic cost increases
would have on the ability of manufacturers in Orange County to remain competitive in a
global economy. Such a rate increase will require the mill to find other savings to offset
these charges and will certainly undermine our ability to attract the new investment vital to
our continued success.
We respectfully request that you do not approve the rate increase proposal presented
tonight, but instead call for a comprehensive, independent review of the entire rate
structure. We believe this is necessary to ensure a fair and equitable rate structure.
Sincerely,
~I~
David /t Sprissler
Mill Manager
DAS: kb
RE : AGENDA ITE M NO . 3
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
October 27 , 2004-7 :00 P.M.
Min ute excerp ts have bee n receive d as set forth be low. Pursua nt to R egular Agenda Item No. 3, it is
appropriate to receive and fil e said excerpt s:
3 . Cons ideratio n of motio n to receive a nd file mi nu te ex ce rp t s from the following re
a pp oin tment of ac ti ve a nd al te rnate Directors , as fo llows :
City/Ag e ncy Active Dire ctor Al te rn ate Di rect or
T usti n Doug Davert Tony Kawashima
H :ldept\agen da\Board Agendas\2004 Board Agendas\012804 supplemental agenda.doc
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE :10/27/04 TIME : 7 :00 p.m .
(SIMONIAN) .................... ANDERSON ................... / _f_
(WILSON) ........................ BANKHEAD ................... ~ _)__
(FRESCH I) ....................... BORTLE ...................... _L _:f__
(AMBRIZ) .......................... CAVECCHE .. ... ..... ... ... ... / .:L_
(GARCIA) ......................... CHRISTY..................... / ..L_
(CRANDALL) .................... COLLINS ...................... ---:7° _:/___ __
(COERPER) .................... GREEN ....................... / 1r_j-3 1/I/ t.r.ilfl. __
(BROADWATER) ............. DALTON ....................... / /elf.A '>? __
(SHAWVER) .................... DONAHUE ..................... c:::.---(/\_-__
(WILSON) ......................... DUVALL. ..................... ~ ~ __
(DICKINSON) ................... ECKENRODE ................. __L_ c-l~i--__
(SCHAFER) ...................... FERRYMAN ................... / _v __ _
(POE) ................................ JEMPSA...................... / _._L_ __
(KAWASHIMA) ................. DAVERT ...................... ~ -45.£J_c ~c>-39 v
(SHEA) ............................. KROM ........................ _.iL_ ~
(DOW) .............................. MARSHALL.................. / ...L--
(HERNANDEZ) ................. MCCRACKEN............... / ~
(SWAN) ............................ MILLER......................... V"" .lL.._
(BEAUMAN) ..................... MOORE ........................ ~ .L.._
(EPPERSON) ................... NEUGEBAUER.............. ./ -L--
(KEENAN) ........................ PIERCY........................ / _iL__
(WEBB) ............................ RIDGEWAY ................... ~ -'--
(SMITH , CHUCK) ............. SILVA........................... ~ -1-
(HERMAN) ........................ WALKER....................... / _:::::::.___
(ANTOS) .......................... YOST ........................... C A./ OL---
STAFF:
Anderson /
Beekman ,/
Ghirelli ,/
... 1 ;:.,& J 1 1< Ctt ; r f5 (b tt ~Cl }f &(_;
'-/JJf{ L/)Ltt-..( 1 ~ f p,t. /!Ul,Jffi,_, I ~ -
Kyle v
Ludwin ./
Miles /
Ooten ,/
Streed ,/
Tomko /
OTHERS:
Woodruff ,/
Ni x on
10/27/04
G:\wp .dta\admin\BS\DIRECTOR\Directors Roll Call.doc
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE :10/27/04 ~TIME;: 7 :0 ~ p .m .
~ 1176 h{JJ~~
(SIMONIAN) .................... ANDERSON ................... _L ---L-.. __
(WILSON ) ........................ BANKHEAD ................... __iL_ rJ
(FRESCH!) ....................... BORTLE ...................... ~ 2i._
(AMBRI Z ) .......................... CAVECCHE ................... ~ /
(GARCIA) ......................... CHRISTY ..................... _L_ ..Ld_
(CRANDALL) .................... COLLINS ...................... ~ v
(COERPER) .................... GREEN ....................... --iL-.,./
(BROADWATER) ............. DA L TON ....................... __L_ ,v
(SHAWVER) .................... DONAHUE ..................... ..k::::::::._ C/-
(WILSON) ......................... DUVALL...................... v ......--
(01 CKINSON ) ................... ECKENRODE ................. v" _t:l_
(SCHAFER) ...................... FERRYMAN ................... ._,/" v
(POE) ................................ JEMPSA ...................... L_ v
(KAWASHIMA) ................. DAVERT ........ ... ......... .. ./ v
(SHEA) ............................. KROM ........................ __.I::'.:'.'.:_ v
(DOW) .............................. MARSHALL.................. v _.!::::!_
(HERNANDEZ) ................. MCCRACKEN ............... _LL_ _iL_
(SWAN) ............................ MILLER ......................... v ~
(BEAUMAN) ..................... MOORE ........................ ~ ~
(EPPERSON) ................... NEUGEBAUER.............. ./ ~
(KEENAN ) ........................ PIERCY ........................ v" v"
(WEBB) ............................ RIDGEWAY................... / __L
(SMITH , CHUCK) ............. S ILVA ........................... / __iL_
(HERMAN) ........................ WALKER ....................... ~ _.i:d_
(ANTOS) .......................... YOST .......................... ·~ CA---
STAFF:
Anders on
Bee kman
Ghirelli
Kyle
Ludwin
Mil e s
Ooten
Stre ed
Tom ko
OTHERS:
Woodruff
Ni x on
10/27/04
G :\wp.dta\admin\BS \DIRECTOR\Directors Roll Call .doc
SIGN-IN SHEET
ORANGE COUNTY SANITATION DISTRICT
__ /~t)-+-1~~~1)---1/'--0~cj'--·-----BOARD MEETING I ,
NAME ORGANIZATION/FIRM
rint
H :\W P .DTA\ADM IN\BS\FORMS\SIGN-IN FORM.DOC
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Board Secretary prior to commencement of the Board
meeting . As determined by the Chair, speakers may be deferred until the specific item is taken for
discussion. Remarks may be limited to three minutes or less. Any handouts (35 COPIES
REQUIRED) must be given to the Board Secretary prior to the meeting for distribution.
DA TE: I 0 · (j_ 7 -v 4 AGENDA ITEM NO . __._f ] ......... __ _
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
NAME: (please print)
HOME ADDRESS: L ·v\.£
(number/street)
'5 A ~ ;[ {/ #. 1V
,~
A ,(l l t,I ,evt Nu
(city/zip code)
TELEPHONE : (11 ~) :r 7 ro , 3 t i .s-
REPRESENTING:
(self/name of organization)
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Board Secretary prior to commencement of the Board
meeting. As determined by the Chair, speakers may be deferred until the specific item is taken for
discussion. Remarks may be limited to three minutes or less . Any handouts (35 COPIES
REQUIRED) must be given to th Board Secretary prior to the meeting for distribution.
DATE: AGENDA ITEM NO. r7
* * * *' * * * * * * * * * * * * * * * * * * * * * * * * * *
NAME : (please print) R l Ne tf f t?C& u
HOME ADDRESS :
(~code) I _
'++4 2C(-]Jo 7 TELEPHONE :
REPRESENTING :
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address the Board on specific agenda items or matters of general interest
should complete and submit this form to the Board Secretary prior to commencement of the Board
meeting. As determined by the Chair, speakers may be deferred until the specific item is taken for
discussion . Remarks may be limited to three minutes or less. Any handouts (35 COPIES
REQUIRED) must be given to the Board Secretary prior to the meeting for distribution .
DATE : 10/z7 /o~
I I AGENDA ITEM NO.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
NAME : (please print)
HOME ADDRESS:
(number/street)
Ll-o. vd3-f") -<3: 1$-c6_J, C.A qz0 6l)
TELEPHONE:
REPRESENTING :
(self/name o ~anization)
REQUEST TO ADDRESS THE BOARD OF DIRECTORS
All persons wishing to address t he Board on specific agenda if ems or matters of general interest
sh o uld complete and submit th is form to the Board Secretary prior to commencement of the Board
m eeting . As determined by the Chair, speakers may be deferred un t il the specific item is taken for
discussion . Remarks may be limited to three minutes or less. Any handouts (35 COPIES
REQUIRED) must be given to the Board Secretary prior to the meeting for distribution.
DATE: AGENDA ITEM NO . 11 . J J
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
NAME : (please print)
HOME ADDRESS :
(numb e r/street)
A/4y~I~ 'Cd
(city/zi p code ) J
TELEPHONE : (l/'f ) 6 fe lr~J
REPRESENTING :
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, I hereby certify that
the Notice and Agenda for the Regular Board Meeting of Orange County Sanitation
District to be held on / )c/;d_~, :::< ') , 2004, was duly posted for public
inspection in the main lobby of the Districts' offices on /Jttr!~ c2_ J , 2004 .
v J-
IN WITNESS WHEREOF , I have hereunto set my hand this )_/ day of
c t--tFfi: I 2004.
Penny M. Kyl , Secretary
Board of Directors
Orange County Sanitation District
H:\DEPT \ADMIN\BS \FORMS\AGENDA CERTIF IC A TI ON. DOC
phone:
(714) 962-2411
fax:
(714) 962-0356
www.ocsd.com
mailing address:
P.O. Box 8 127
Fountain Valley. CA
927 28-81 27
street address:
1 0844 Ellis Aven ue
Fountain Valley, CA
92708-701 8
Member
Agenc ies •
Cities
Anaheim
Bres
Buens Psrk
Cypress
Fountain Valley
Fullerton
Garden Grove
Huntington Beach
Irvine
La Habra
La Palms
Los Alamitos
Newport Beach
Orange
Placentia
Santa Ana
Sesl Beach
Stant on
Tustin
Vi/ls Park
Yorbs Linds
County of Oran ge
Sanitary Districts
Costa Mesa
Midway City
Water Districts
Irvine Ranch
ORANGE CO UNTY SANITATION D ISTR IC T
October 20 , 2004
To the Chair and Members
of the Board of Directors
Subject: Board Letter
The following are items that you may find interesting. If you need additional
information on any of the items, please call me .
Sanitation District Receives National EPA Award for Biosolids Program
On October 4th, at the Annual Water Environment Federation Conference,
EPA awarded the District for our biosolids management program. We
received the award for our continued commitment to effective planning,
management, outreach and the first-in-the-Nation Environmental
Management System.
I am particularly proud of this award and the employees who have worked so
hard over the last several years to make it possible.
National Purchasing Institute Award Sanitation District "Achievement of
Excellence in Procurement Award"
I have been notified that the District has received the 9th Annual
Achievement of Excellence in Procurement Award. The award for given to
us for innovation, professionalism, e-procurement, productivity and leadership
in our purchasing department. We will be receiving a trophy in Nierenberg
On One Hand, Wet Weather "El Nino" Planning
As you all may be aware, a mild El Nino is forming in the Pacific . While
meteorologists are still uncertain what this will mean for our weather, we need
to plan for all contingencies. We will soon be sending a letter to all city and
agency managers reminding them that we have rubber stoppers and duct
seal putty available to their maintenance departments to plug and seal
sanitary sewer covers from rainwater inflow during heavy storms. Priority
locations are those in gutter flow areas and intersections that are prone to
curb-to-curb flooding.
To maint ain w orld-c lass l eadership in wastewater and wat er resource management.
i
Board of Directors
Page 2
October 20, 2004
Our letter will also include a reminder that under no circumstances should
maintenance workers or public safety personnel open sanitary sewer
covers to relieve flooded streets. We know that flows can double during
hea vy storms and this excess flow can cause sanitary sewers to surcharge
and spill raw sewage. By preparing now for winter rains, we can all work
together to ensure that we minimize any problems that might cause sewage
spills. This also helps us all comply with our Reg io nal Board WDR Order.
On the Other Hand , The Seven States of the Colorado River Watershed May
be Facing a Long-Term Drought
As I sit here writing this , it is raining cats and dogs outside my office window.
However, one good series of rain storms does not a drought break. It is hard
to know whether we are in for a long and disruptive dry spell in the southwest,
but one thing is clear: major reservoirs within the Colorado River drainage
area are significantly down. Take a look at the bathtub ring around Lake
Mead the ne xt time you are in Las Vegas and you will be convinced there is
reason to be concerned.
The attached article from the LA Times describes the situation.
Groundwater Replenishment System draws praise from Governor
Governor Arnold Schwarzenegger commended the Orang e County Sanitation
District and Orange County Water District on the occasion of the
Groundwater Replenishment (GWR) System groundbreaking ceremony held
on September 20th. His letter, which is enclosed, commends both distri cts for
their ingenuity in promoting water efficiency and conservation. At almost the
sa me time, the WateRe use Association recognized the two districts with its
2004 Publ ic Education Program of the Year Award for the effectiveness of
the community outreach efforts for GWR.
Also enclosed is a copy of a news release published jointly by three
agencies: the Municipal Water District of Orange County, Orange County
Sanitation District , and Orange County Water District. The release focuses
on water conservation.
Board of Directors
Page 3
October 20, 2004
Wes Bannister to Lead Metropolitan Water District
Wes Bannister, a Huntington Beach resident and water policy-maker for more
than a decade was elected chairman of the Metropolitan Water District in Los
Angeles on Tuesday for a two-year term . It is customary for a chair to serve
four years or more. Bannister replaces Phil Pace of Montebello , who was
chairman for six years.
Bannister has served on the board of Metropolitan, the region's wholesale
water supplier serving 18 million people, for the past 11 years. He's also on
the Orange County Water District board and served on the Sanitation District
Board of Directors while a member of the Huntington Beach City Council.
Bannister, elected by the other 37 Metropolitan board members, is only the
second Orange County chairman in the agency's 75-year history .
Bannister's understanding of the environmenta l and water supply issues that
are important to Orange County and to the southwest should serve us well.
The Biosolids Advisory Committee
The Orange County Sanitation District has established a Biosolids Advisory
Committee (SAC) to educate residents and stakeholders about OCSD's
Long-Term Biosolids Management Plan and to obtain vital input on how to
best implement the viable alternatives for implementation . A report from the
SAC will be given to the Board of Directors as public input in early 2005 .
The SAC will serve in an advisory capacity to the Sanitation District's board of
directors, not as a decision-making entity. All members will serve as
volunteers and without compensation. The committee has met three times
and will continue to meet weekly through December.
The SAC includes: two former OCSD directors , marketing professionals,
political affairs professionals, engineers (civil, electrical, and mechanical),
business men, environmentalists, a geologist , hydro geologist, two lawyers ,
OC Taxpayers Chairman and environmental planners .
A facilitator had been retained assist the Biosolids Advisory Committee. The
primary focus of the facilitator is to ensure the process remains open,
collaborative and productive; be responsible for helping to keep the meeting
focused and on track .
For more information contact Sonja Wassgren, 714-593-7122.
Board of Directors
Page 4
October 20, 2004
Articles of Interest
I have also included several additional published articles that you might find
interesting.
If you would like additional information on any of the above items, please call
me.
Blake P. Anderson
General Manager
BPA:gg
H:\DEPT\ADMIN\GM\LETTERS TO THE BOARD\04\092204 BOARD L TR.DOC
Attachments
• #~D8t4~
(Si) 1
'tPRQ1fl'
..;,
Mr. Steve Anderson
Chairman
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON, D.C. 20460
SEP 2 Q 2004
Orange County Sanitation Board of Directors
10844 Ellis Avenue
Fountain Valley, CA 92708-7018
Dear Mr. Anderson:
OFFICEOF
WATER
I am pleased to announce that the Orange County Sanitation District has been selected to
receive the Environmental Protection Agency's (EPA) 2004 National Clean Water Act
Recognition Award for Special Recognition of its outstanding biosolids management program.
This award is being made in the Biosolids Exemplary Management Awards Program category.
EPA based this selection on Orange County Sanitation District's continued commitment to
effective program planning, management, public outreach and stakeholder involvement, and
pioneer efforts in developing and implementing their Biosolids Environmental Management
System (EMS).
We will officially announce the national winners at the EPA's National Clean Water Act
Recognition Awards Ceremony on Monday, October 4, 2004, in New Orleans, Louisiana, during
the Annual Water Environment Federation's Technical Exposition and Conference. My staff will
contact you shortly to provide more information regarding the ceremony and conference, and to
answer any questions you may have.
Congratulations and thank you for your commitment to excellence in biosolids
management
Sincerely,
~K,
Benjamin H. Grumbles
Acting Assistant Administrator
Rocyclod/Recvclabla • Prrnted wllh Vagalable OU Based lnk9 on 100% Racyctsd Paper (20% Postconsumer)
co: Senator Dianne Feinstein
Senator Barbara Boxer
Congressman Dana Rohrabacher
Congressman Ed Royce
Congresswoman Loretta Sanchez
Congressman Christopher Cox
Congressman Gary Miller .
Governor Arnold Schwarzenegger
Regional Administrator, EPA Region IX
Rob~ P. Ghirelli, Technical Services Manager
National Purchasing Institute, Inc.
September 21, 2004
Blake Anderson, General Manager
Orange County Sanitation District
I 0844 Ellis Ave.
Fountain Valley, CA 92708
Subject: Achievement of Excellence in Procurement Award
Dear Mr. Anderson:
Ad!iemnent of Excellem in Proc:uRll!fnt~
P.O. Box 53o669
Henderson, NV89053-o<l69
Tel: (702) 260-7114 Fax: (702) 260-7052
www.nationalpurchasinginstitute.org
The Achievement of Excellence in Procurement award is designed to recognize organizational excellence
in procurement. The award is achieved by those organizations that demonstrate excellence in
procurement by obtaining a high score on a rating of standardized criteria. The program is designed to
measure innovation, professionalism, e-procurement, productivity, and leadership attributes of the
procurement function. The Achievement of Excellence in Procurement is sponsored by the National
Purchasing Institute (NPI), the California Association of Public Purchasing Officers (CAPPO), Florida
Association of Public Purchasing Officers (F APPO), the Institute of Supply Management (ISM), and the
National Institute of Governmental Purchasing (NIGP).
It is my pleasure to notify you that the Procurement Department for the Orange County Sanitation District
has earned the 9th Annual Achievement of Excellence in Procurement Award for 2004. Moreover,
Orange County Sanitation District is one of only 61 to receive this national award at least three times.
A beautiful trophy, which has developed into the AEP icon, will be presented at several locations or
mailed in mid-November, in accordance with your previous instructions.
Congratulations on the Achievement of Excellence in Procurement Award.
Sincerely,
U~--~e.~
Wayne A. Casper, C.P.M.
Director of Procurement
City of Tucson
**and**
Chairperson
Achievement of Excellence in Procurement Award Committee
cc: Chris Maher, Senior Buyer
Achievement of Excellence in Procurement Award Committee
ISMlM
);a 4
-
Certified Purchasing Manager • The Competitive Edge
~
institute for
supply management
GOVERNOR ARNOLD SCHWARZENEGGER
September 20, 2004
Orange County Water District
Orange County Sanitation District
I am delighted to send my greetings to all who have gathered to celebrate the
construction of the Groundwater Replenishment System.
California's economic and environmental future is enhanced by our ability
to maximize precious resources. The GWR System is an environmentally
responsible approach for securing alternative sources of water. It increases
Orange County's water independence by creating a drought-proof supply of
safe, clean water.
I commend you for your ingenuity in promoting water efficiency and
conservation. Your efforts save energy, minimize wastewater released to the
Pacific Ocean and help sustain healthy water resources for future
generations.
My administration shares your goal of improving the quality of life for all
Californians and supporting that mission through innovative, effective
action.
Please accept my best wishes for every future success.
Sincerely,
Arnold Schwarzenegger
STATE CAPITOL • SACRAMENTO, CALIFORNIA 95814 • (916) 445-2841
~M
Contacts
'IElllEIUIE
~-MUNICIPAL
WATER
DISTRICT
OF
ORANGE
COUNTY
Jennifer Greenlief, Orange County Water District
714/378-3323
Michelle Tuchman, Municipal Water District of Orange County
714/593-5014
Mac Mclaughlin, Orange County Sanitation District
714/593-7106
AS DROUGHT CONTINUES,
FOR IMMEDIATE RELEASE
RESIDENTS, BUSINESSES URGED TO USE LESS WATER,
ESPECIALLY FOR LANDSCAPE IRRIGATION
Overwatering is the single greatest waste of water in Orange County
FOUNTAIN VALLEY, Calif. (Oct. 4, 2004)-With water at a premium, rates certain to rise in
the future, and runoff polluting our waterways and beaches, the county's three largest water
resource management agencies are collectively stressing the need to conserve water,
especially for landscape irrigation, as the drought continues.
The Orange County Water District (OCWD), Municipal Water District of Orange County
(MWDOC) and Orange County Sanitation District (OCSD) all agree that area homeowners
and businesses can help ease the stress on our water resources by not over-watering their
lawns and gardens.
--more -
AS DROUGHT CONTINUES, RESIDENTS,
BUSINESSES URGED TO USE LESS WATER
2-2-2-2
"Some 55 to 60 percent of the total water usage in Orange County is for landscape irrigation,"
said Brett R. Barbre, president of MWDOC, the agency responsible for managing Orange
County's imported water supplies. "On average, each site is over-watered by 25 percent,
which makes landscape irrigation the single greatest waste of water in Orange County."
According to regional water officials, Orange County residents are doing a good job being
water efficient by using low-flush toilets and showerheads. But now that the drought is
continuing with no projected relief in sight and demand is high, water efficiency and
conservation efforts must be further increased.
"The drought gripping the West is the worst in 500 years and demand is high right now," said
Denis Bilodeau, OCWD Board president. "Our groundwater basin is low from increased
demand and we need to fill it back up."
Not only is over-watering a tremendous waste of a precious resource, it is also the primary
source of urban runoff, a major source of pollution in our creeks, rivers and near-shore ocean
waters.
"Runoff from lawns contains pesticides, animal waste and other pollutants. The contaminated
water travels down the street, enters the storm drain system and flows directly to creeks,
--more -
AS DROUGHT CONTINUES, RESIDENTS,
BUSINESSES URGED TO USE LESS WATER
3-3-3-3
rivers and the ocean without the benefit of treatment," said Steve Anderson, chairman of the
Orange County Sanitation District. "Reducing urban runoff will have a very positive effect on
our regional waterways and ocean waters."
For more information on water use efficiency programs in Orange County, log on to
www.bewaterwise.com.
Landscape Watering Tips
• Irrigate landscaping very early in the morning or during the nighttime hours when
water demand is lowest.
• Make certain sprinkler heads are operating properly. A brown patch of lawn probably
means a sprinkler is broken or blocked by dirt, bugs or overgrown grass.
• Hotter weather doesn't necessarily mean lawns and landscaping need more water.
Check the soil before increasing watering. If the soil is wet, there's no need to change
watering times.
• Adjust automatic timers throughout the year. Landscaping requires far less water
during cooler months. And, don't forget to turn off automatic sprinkler systems when
it's raining.
#####
. '
Sep 29 2884 18:18:12 \f ia Fax -> +714 962 8356 Elake Anderson Page 881 0£ 883
A Groundwater
~Replenishment System
FOR lllllEDIATE RELEASE SEPT. 28, 2004
FOR FURTHER INFORMATION CONTACT:
Rebecca Long, OCWD, (714) 378-3362
GROUNDWATER REPLENISHMENT SYSTEM OUTREACH EFFORTS NAllED
.. PUBLIC EDUCATION PROGRAM OF THE YEAR" BYWATEREUSE ASSOCIATION
FOUNTAIN VALLEY, Cellf.-Orange county Water District (OCWD) and Orange
County Sanitation District's (OCSD) cammunlcatianS team r¢ly received the top
honor of 2004 PubHc Education "Program of tne Yest' trom me WateReuse A&&aciidion
for work on the Groundwater Replenishment (GWR) System. The GWR System'a publtc
information program was recognized for it& exc:a11ence in community ratations and public
informatJon and OUll'each. The winner was announced at 1he wateReuse A88oclatlon's
2004 Annual Symposium last week in Phoenix, Arizona.
'We are truly hOnored to be racognized for our efforts in public outraaeh,• said Denis
Bilodeau, president of the OCWD Board of Direclora -Fram the beginning,, 1he boards of
director& from both agencies have been cammitted to a comprehensive public outreach
program to ensure all residents in our service areas ara lnfarmael about the GWR
System. We attribute much of our success in mewing this projecl forward and gaining
pubfie aupport to our outr&ach effort&•
The GWR System, a litatS-Of-the-art water purification project. takee highly treated
sewer watel" that I& currently released into the ocean and purifies it using the same
technologies that purify baby food, fruit juieeS, medicines and bomed water. The GWR
System -.11 create a new supply of extremely higtMluallty water for use in an expanded
seawater intrusiOn banter and to augmem groundWater aupplies for north and central
Orange Couniy rasidents.
(mare)
A JaaJZ etfun of 'Ille Oranre Coa.nr1 Wmt• ·o,s/l.ct'and rhc: OIQr1ge Co&.t.iy Sanmmon Diru.a
(? 14) 37Q..3200 • Fax (714} 378-3381 • 10500 Elhs A~nue • fountain valley • Caldomaa 92708 • WWW.gwt'$J~ietn com
Received 09·29·04 03:13pm From-Via Fax To-OCSD Pqe 001
. '
Sep 29 2884 18:18:47 Via Fax -> +714 962 8356 Blake Anderson Page 882 or 883
GWR SYSTEM PUBLIC OUTREACH EFFORTS HONORED--2
The WateReuae Association is a nan-profit organization whose mission iS to help its
members aeate new sources of high-quality water tnrough water reuse. Each year,
WateReuse recognizes a public education program that aehieVes outstanding results
communicating wi1h the pilblic about water~lated iSSue&.
"Baaed on our raaearcn, we know tnat once people ase mformed abaut the need for the
projact the cost and energy saVings; and &.1nderstand thai GWR System produced water
will be as pure as battled water, they am very supportive of the proj~ • said carol
Beekman, OCSD dire=r af commMnications and administrative services. ·That's why
we ramain dedicated ta informing the puDlic abal.ll tacal water issues and the GWR
System. Our goal is to talk ta every araup in Orange Cauruy and ta reach each rasident
peraanalty and give tnem 1he opportunity to have lheir questions answerac1.•
To effectivelY infonn the public about 1he need for the GWR System and that lhe praject
· wiH produce extrernaly high-quality, ntliable water source; the ageneies have been
implementing a compnmen&ive public infannation program. The program includes
meaia raratians, cammunilY relations. speakers' bureau, government outreach. 1>"8iness
outreaCh. healthlmectlcal outreach, enviranmental oU11'9aeh, advetbSing, bl.1$1ness
outreach and minority outraaeh.
GWR System public oweaeh accomplishments include:
> More than 700 prasentatiOns ghten to civic and community organizations
,_ Consistent meclia coverage including national news stories in The Wall Stteet
Journal, ABC World News Tonight with Peter Jennings and MSNBC.com
Jio Compnm&nsiVe outraach to an.nee County's diverse communities ineluding
project information provided In Spanish. Viemamese ana Korean.
> Development of project Web site, www.gwrsysrem.com
> Project \flcteo produced by Huell Howser. hast Of -Califomia's Gold·
> Received more than 300 letters at endorsement frum environmental groups,
pubHc health/medical experts, elected offieials. chambers of commerce.
community organiZations and parent teaeher assaciatians.
(more)
Received 08·28·04 OS:1Spm From-Via Fax To-OCSD Pan 002
...
Sep 29 2884 1e:19:23 Yia Fax -> +714 902 8356 Blake Anderson Page 883 Of 883
GWR SYSTEM PUBLIC OUTREACH EFFORTS HONORED-3
More infonnaiion on the GroundWater RepleniShment System iS a"8slable at
www.gwmystem.com.
The GroumlNalBI' Rep/snisllment (GWRJ System. s new nign-reclJ war punlif:ation ayst&m. will ptoauce
wBler smi1ar 111 qflllfty to llOlll8d wBler Once complBte, me GWR SyStem w111·
• HB/p •6tl lurute water l8ltaOilitY Ill OtatJ98 County anti tlllDUgllaut Soutllem C81ifomia.
• Help pm*'9 telialJIB water aunng future dtDuglltB.
• Save energy oy Pl'DduCl'lfl very nigh qualty waler for one-half tne en91gy that I takes to
bnng water nsre from Nonnem CfJliom•
• Produce sucn IJJgn qualty wanrmat II will llefl ·soften" the content Of tne fl/Dunditator
oasin, wni:ll &11B111ually will msan longer appliance life.
Received 09-28-04 03:13pm From-Via Fax To-OCSD Pua 003
Groundwater Replenishment _______________ --=.BY.z...:.M~a.:....:.c M=cLa=u=si.::..:.:.:'u"
Initial phase of groundwater
replenishment system begins operations in
Southern California
The state-of-the -art water purification facility in Orange CounhJ Water District in Sou th ern California, USA , paves
th e way for future projects that protect groundwa ter from sa line intrusion , provide drought -proof water supp ly, and
solves wastewater di scharge probl ems.
T he new Phase One
Groundwater Replenishment
(GWR) System in California's
Orange County Water District
(OCWD) now sends five million
gallon s per day of purifie d water to
the s eawater intrusion ba.rrier that
keeps the Pacific Ocean out of
drinking water supplies in Southern
California's Orange County.
The Phase One facility is a small er-
scale version o f the Grou ndwater
Replenishment (GWR) System's
A d vanced Water Purification Facility
(AWPF) that is currently under
con struction and scheduled to begin
produ cing 70 million gall on s of water
per day in 2007.
Both facilities receive highly treated
sewer water that is curre ntly re leased
into the ocean and purify it to better-
than-bottl ed water purity u s ing a
redundant state-of-the-a rt water purifi-
cation system that includes microfil-
tration, reverse osm osis and ultravio let
light with hydrogen perox ide. This
purified water surpasses s tate and
federal drinking water re quirements
and is the hi gh est quali ty available.
"This project is s ignificant to water
18
Aerial rendering of
the Orange County
Water District
(OCWD) site when
the Groundwater
Rep lenishment
(GWR) System 1s
complete 1n 2007
l'h oto b\ O<:WIJ
managem e nt professionals throug h out
the world," said Denis Bilodeau, pres-
ident of the Orange County Water
District. "The GWR System is the first
water purification system of its kind to
deploy a membrane-based technology
with this combination of process es, and
it represents a valuable model for
regions across th e g lobe facing similar
combination s of population an d
climate pressures as California."
will provide a reliable, d rought-proof
source of water for Oran ge Coun ty,
and serve as an alternative to
discharging was tewater to the ocean,
solving severa l community problems
w ith one p roject.
Orange County is located in an arid
region, and is currently in the mi dst of
a prolonged drought affecting the entire
western United States. Future water
s upplies are being challenged because
of limited water s upplies and other
environmental an d political factors . The
GWR System provides a new, locally
controlled, hig h-quality s upply of water
to recharge the groundwater bas in and
reduce the severity of drought impacts
o n Orange County.
The project will represent a major
contribution to s atisfying the demands
on agency water resources, expected to
grow from the current 505,000 acre-feet
per year to 605,000 acre-feet per y e ar
by 2020. More than half of th e a r ea's
water s upply for 23 northern and
central Orange County communities is
drawn from g r oundwater aquife rs,
with the remainder imported fro m the
Colorado River and California's S tate
Wate r Project.
Half of the water from the GWR
System will be injected into Orange
The GWR System is th e first water
purification system of its kind to deploy a membrane-bas ed technology
with this combination of processes, and it represents a valuable model for
regions across the globe facing similar combinations of population and
climate pressures as California . __ ·-·----·---·····--.. ·--·····-·-·-···· ... Denis Bi l ud~au. Or.ing l' Cuun ly ll'd tcr Di>trict
The GWR System, a joint project of
OCWD and Orange County Sanitation
District (OCSD), will serve three key
fu n ctions when fully operational. It
will produce purified water that will
be injected into a seawater barrier to
prevent ocean water fro m contami-
nating Orange County's gr oun dwater
basin. In addition, the GWR System
Cou nty's seawater barrier through 36
injection wells w he n the system is
completed and operational. The
remaining water will be piped to
spreading basins in Anaheim,
California, where the water will take
the natural path of rainwate r as it filters
through clay, sand and rock to the
groundwater aquifer. This new source
Water & Wastewater I nte rna tion al Magazine W&WI SB'nMllBl 2004
Groun dwater Reple ni shment _______________________ _
for groundwater recharge is estimated
to meet the needs of 140,000 families.
The GWR System will h e lp m eet the
lo ng-range water supply plan
develope d b y Metropolitan Water
District of Southern Cali fornia, the
water impo rt agency for Southern
California, to maintain a nd improve
region a l water s upplies.
"It's safe to label the Ground water
Re plenis hment System a win-win
project for th e water and wastewate r
indus tries," OCSD General Manager
Blake Anderson said. "It's e nviro nme n-
tally beneficial because it improves
w ater quality a nd drought mitigation,
saves en ergy over importi n g water
from Northern California, and becau se
it reduces the n eed for import ed water
from Northern California, it lessens the
s train on th e ecosys te m of the San
Francisco-San Joaquin Bay Delta. In
addition, without this project, OCSD
would have to build another ocean
outfall to handle increased flows to the
ocean," h e added.
This project continues a legacy of
s uccessful p a rtne rship between the
OCWD and OCSD o n a m ajo r water
project. For more th an 25 years, the
agencies have reclaimed cl ean , pure
drinking water from hig hly treated
wastewater at Water Factory 21, a
water purification facility built to
provide a b a rrier against seawater
intrusion into Orange County's vast
groundwater bas in.
Until this year, Water Factory 21, o n e
18
o f the n ation's pioneer water purifi-
cation facil itie s, produce d water for the
seawate r barrier. Foreign dignitaries
from many countries v is ited the facili ty
to learn about the advanced water
purification technology. Now, w ith the
Phase One producing water for the
seawater barrier, Water Factory 21 was
dem olish ed this s ummer to make room
for the new GWR Syste m .
The shut down of Water Factory 2 1
has been o ne of m a n y milestones
OCWD and OCSD have reached
during development o f the US$ 486.9
million GWR System. A decade of
research, comprehen s ive testing and
e valuation a t Water Factory 21 by
OCWD and OCSD e n gineers preceded
the start o f GWR System construction
in early 2003.
o f construction occurring across several
cities that affect nume rous communities.
"Our communicati ons team designed a
proactive, bilingual outreach program
including monthly progress reports to
community leaders, le tters to neighbour-
hoods affected b y construction, and face-
to-face talks with many groups," said
Grebbien. "We've a lso h e ld n eigh-
bourhood gatherings in the heart of the
communities affected by our
construction, and OCWD communica-
ti ons team members continually go
door-to-door in the affected n eighbour-
hoods to provide information on the
project and answer any questions our
neighbours m ay h ave ... we w ant to
inform our neighbours and build
supp ort for this visionary waler projt!Ct."
Informing n eighbours about the n eed
It's ((GWR) environmenta ll y beneficial beca use i t impro ves
water quality and drought mi tigation, saves energy over importing water
from Northern Ca lifornia, and because it reduces the need f or imported
water from Northern California... BlakeAnderson,OCSD
Section of the I )·mile
GWR System pipeline
under construction
between Fountain Valley
and Anaheim. California
ln addition to the water purification
facility, projects currently unde r
con struction include a 13-mile
pipeline, and the injection a nd m o ni-
torin g wells for the exp ansion of the
existing seawater barrier. These
projects -sch edu le d for completion in
phases according to a m aster plan -
are among several s t ages of the GWR
System that collective ly make up the
complex project.
"We'r e not just building a new wat e r
purification plant, we're deploying
technologies, Like microfiltration, that
require new skill sets fro m our e n g i-
neers a n d staff," said OCWD Genera l
Manager Virginia Grebbien .
Adapting to the n ew combinatio n of
the technologies ond the scale of the
project e mployed in the GWR System
and managing the construction of the
s tate-of-t h e-art project h as required
s ignificant effort on the part of OCWD.
"One s ignificant challenge is
managing, in essen ce, close to USS 350
million in construction contracts concur-
rently with up to six differe nt general
contractors that are working in six cities
simultaneous ly as well a s the OCWD
an d OCSD camp us, w hich is b orde red
on three s ides by residen ts," said Mike
Marku s, GWR System program
manager. "We try our bes t to consider
our neighbours w h e n we build n oise
and dust mitigation meas u res into o ur
contracts, as well as landscape bea utifi-
cation projects, " said Markus.
Keeping the public informed as the
project advances has becom e a vital
piece of the plan given the huge amount
for the project and con s truction activ-
ities h as helped build good w ill an d
acceptance of the potential inconven-
ie nces associated with a major
cons truction project.
The two agencies h a ve worke d hard
to reduce the cost of this project to
ratepayers. Recently, the Metropolitan
Water District of Southe rn California
a w arded the GWR Syste m an US$ 86
million s ubs idy, which will h e lp redu ce
the cost of producing woter. The
financial incentives lower the cost of
GWR System water to US$ 476 per a cre-
foot, w hich is less than the expected
cost of imported water in 2007.
Partial funding for the GWR System
co m es from US$ 92.5 millio n in federal
a nd srate grants. Grants include a US$
30 mill io n contribution from the
California D e partment of Water
Resources (DWR) from Propositi o n 13
funds, US$ 37 millio n from the State
Water Resources Control Board and US$
20 million from the federal government.
The GWR System g rant represented the
s ingle largest DWR a ward from
Groundwa ter Storage Program funds
available statewide. The GWR System
has a lso received a US$ 700,000 grant
from the California Energy Commission
because the cost to produce water
locall y requires h alf as much e nergy as
importing t o Orange County from
Northe rn California. W&WI
Author's Note
Mac Mcuwglrlin is a senior co111 11111nicatio ns
specialist for the OCSD, loca tetl in Fo untain
Valley, California, USA.
W&WT llB'TIMIBI 2004
LA TIMES -ORANGE COUNTY
MWD Taps Ex-Mayor to Lead Board
Wesley Bannister is elected with support of O.C. and San Diego
directors. Some see a shift in water agency priorities to the south.
By Jason Felch
Times Staff Writer
October 13, 2004
The state's largest water district elected a new chairman of the board Tuesday, choosing an
Orange County director who promised a more assertive board that would resolve long-standing
disputes that have dogged the agency.
The 37-member board of the Metropolitan Water District of Southern California, a public
wholesaler that provides water to nearly half of the state's residents, elected Wesley Bannister,
68, a former mayor of Huntington Beach who has represented the Municipal Water District of
Orange County on the board since 1993. Bannister will replace chairman Phillip Pace when
Pace's unprecedented third term as chairman ends Jan. 1.
Bannister persuaded board members from San Diego, Orange County and a handful of smaller
water districts that he would retake some authority from district management, which has been
criticized by authorities in Sacramento repeatedly over the last year.
In June, the state auditor found the agency had failed to establish an effective ethics program,
didn't follow its hiring and contracting procedures and had poor oversight over ratepayer dollars.
State legislators have recently written letters to MWD saying the agency has not responded to
the audit's findings, and an investigation by The Times found the district spent $4.2 million on
no-bid contracts without proper documentation.
Many board members said they should have been more aware of the agency's practices.
'We've become almost a rubber stamp," Bannister said. 'We need to have the board back in
charge, directing policy."
Bannister won 51 % of the vote, with unanimous support from San Diego and Orange County
directors and no votes from Los Angeles directors.
His victory could shift power on key state water issues to the south, some directors said.
"The last chairman was elected with the big [water] agencies, including L.A. This time L.A. is
missing," said Timothy Brick, who represents Pasadena.
Carlsbad Mayor Claude "Bud" Lewis, an MWD director representing San Diego, said that city
"will probably have more of a voice now."
Bannister's election with San Diego votes could mean an easing in tensions between the MWD
and the San Diego County Water Authority, which has fought bitterly for water independence for
a decade.
'We've got to put our house back together," Bannister said. "San Diego really wants
independence from MWD, and I understand that we should be supportive of agencies being
more independent. We have to change our philosophy."
Bannister persuaded San Diego directors not to try to resolve their differences with the agency
by going to the media or the Legislature for a year.
Los Angeles representatives said they didn't think there would be a big shift in power.
"Every year, L.A. voting strength has been getting smaller as the south has been getting
stronger," said David Farrar, a director representing Los Angeles. "But everyone votes in their
own self-interest, and I don't think that will change."
Another long-standing issue that could be affected is a dispute between MWD management and
the American Federation of State, County and Municipal Employees, the union that represents
district workers.
In the months before the election, Bannister met three times with union officials, promising to re-
engage the board in union relations.
'We've let management take over the responsibility for negotiating with the union," Bannister
said.
Several board members said Bannister's courting of the union surprised them and won him the
support of some who thought him too conservative.
"Two weeks ago, I was touted as the Orange County ultraconservative right-wing union hater,"
Bannister said. ''This week, I'm the guy who's in the union's pocket."
Bannister has also pledged to be more aggressive in pursuing allegations of inappropriate
behavior by board members and management. "I have a low tolerance level for people who do
things that are not ethical," he said.
He referred specifically to the report by The Times that a senior manager supervised a no-bid
contract with the business partner of the manager's wife. Over five years, the partner received
more than $800,000 from that and other agency contracts.
"I wasn't satisfied with the management's response," Bannister said. "It never came to the ethics
committee. All I got was a letter telling me about it. I would have investigated it completely and
found out exactly just what went on."
THE NATION
As Reservoirs Recede, Fears of a Water
Shortage Rise
The seven states that rely on the Colorado River confront
the possibility of inadequate supplies.
By Bettina Boxall
Times Staff Writer
October 3, 2004
PAGE, Ariz. -Behind Glen Canyon Dam spreads a vista reincarnated. One of the West's
mightiest reservoirs is in steady retreat, the deep turquoise of its waters replaced by the
chalky white of canyon walls submerged four decades ago.
Five years of record-breaking drought in the Colorado River basin have drained Lake Powell
of more than 60% of its water. Flows on the Colorado are among the lowest in 500 years.
Downriver, Lake Mead, the biggest reservoir in North America and supplier of water to
Southern California, Arizona and Las Vegas, is little more than half full. At Mead's northern
end, the foundations of St. Thomas, a little town demolished in the 1930s to make way for
the reservoir, have reemerged.
The 1,450-mile-long river that greens 3.5 million acres of farm and range land and helps
feed the faucets of 25 million people may within a few years lack the water to quench the
West's great thirst. For the first time ever, the seven states that rely on the Colorado are
confronting the possibility of a shortage.
"They've never had to face a shortage of this consequence," said Pat Mulroy, head of the
Southern Nevada Water Authority that supplies Las Vegas, one of the most river-dependent
cities in the Colorado basin. "When you're right up against it and facing the possibility of
inadequate supplies to municipalities or farmers or jeopardizing recreation values, these are
very tough choices."
The states are meeting now to try to figure out how they will deal with a shortage if the
drought continues. As with everything else on the heavily regulated Colorado, the answers
will be found in a complex tangle of law and politics.
If the law of the river was strictly followed, cuts would be made according to a hierarchy of
water rights, with Arizona, Nevada and the upper basin states of Colorado, Wyoming and
Utah taking the first hits. California, which gets about 14% of its statewide water supply
from the river, has some of the most senior rights on the Colorado and is in a comparatively
good position.
But the states may try to avoid triggering cuts. One approach would be for utilities to buy
water from farmers and growers -who use 80% of the river's water -and send it to
1 of4
cities.
"With voluntary transfers you can easily take care of the big urban needs In the lower basin
with compensation to farmers, and you don't have to dry up agriculture to do that," said
Robert Johnson, the lower Colorado regional director for the U.S. Bureau of Reclamation,
which operates the dams and reservoirs that make up the river's vast plumbing system.
"I don't want to downplay the importance of the drought," he said. "But my own opinion is
we'll figure out how to deal with it."
If the states don't come up with a plan, the federal government will. "The [Interior]
secretary will be forced to take action within three years, and potentially within two, if the
states haven't solved the problems themselves," Bennett Raley, assistant secretary for
water and science for the U.S. Department of the Interior, warned last spring.
Nowhere is the drought as dramatically evident as at Powell, one of the last major
reservoirs constructed in the West. As the water recedes, the stunningly blue desert lake,
loathed by conservationists for drowning a majestic canyon in the mid-1960s, is disinterring
its past. Glen Canyon is reemerging, caked with white mineral salts left by the backed-up
waters of the Colorado.
At Warm Creek Bay, one of Powell's many arms, the lake's decline can be measured by the
height of the advancing green forests of salt cedar, an invasive shrub that is quickly staking
its claim to the emerging lake bottom. The exposed mud has puckered Into salt-crusted
chunks, a loose puzzle of fudge-like pieces.
The last time it was full, in 1999, the Powell reservoir extended for 186 miles upriver. It is
now 145 miles long. The lake level has dropped nearly 130 feet. If it continues its downward
creep, there may not be enough water to generate hydropower in two years.
By 2007 or 2008, Powell could sink below the dam's intake tubes. At that point, the lake
would be more than three-quarters empty. Releases from the reservoir couldn't be made
until nature provided more water. This year, nature delivered half the normal inflow. In
2002, one of the driest years ever recorded on the Colorado, it was a quarter of the norm.
As the reservoir's levels plunge, so does hydropower production. At Lake Mead, Hoover
Dam's generating capacity is down 17%. At Glen Canyon Dam, it has dropped 30%. The
Western Area Power Administration, which distributes electricity from the dams, is cutting
deliveries and expects to spend more than $30 million this year buying power to replace the
lost Glen Canyon energy.
Meanwhile, the National Park Service is spending millions of dollars chasing the retreating
waters at Mead and Powell, moving stranded recreation facilities and extending boat ramps
that now end in cracked mud.
It could get worse. The drought is the most severe to hit the river since record-keeping
began in 1906 and among the worst in 500 years.
Ancient tree rings tell of dry periods that persisted along the Colorado for decades. In the
late 1500s, two major droughts gripped the region back to back.
"It seems like it's reasonable to assume it could happen again," said David Meko, an
associate research professor at the University of Arizona's Laboratory of Tree-Ring
2of4
Research. "We could have a few years off and dive into another one of these."
Even if bountiful snowfall and rainfall return, it will take years for Powell and Mead to refill.
And even if the Colorado's flows return to normal, that wouldn't match what the states were
experiencing when they divvied up the river's water in the early 1900s.
The early part of the last century was unusually wet. The annual flow on the Colorado was
then estimated at 18 million acre-feet (one acre-foot is enough to supply two average
households for a year). But the average since then has been closer to 15 million acre-feet.
Tree-ring studies suggest that over the last 1,500 years, the average has been even less,
between 13 million and 14 million acre-feet.
"They divided a very large pie, and we may have a smaller pie," said Jeanine Jones, the
Colorado River chief for the California Department of Water Resources.
Even without the drought, population growth has been pushing use levels closer to the
limits of what the river can give. In that sense, the drought may be an early warning.
"The worst thing that could happen now is if the drought goes away and we don't do
anything. Shame on us," said Dennis Underwood, who oversees Colorado River issues for
the Metropolitan Water District of Southern California.
Doing something is not easy on the river, which in times of abundance has been marked by
court fights over who gets what.
"What concerns me about the current situation," said Scott Balcomb, a water attorney who
represents Colorado in the state drought talks, "is it's a competitive environment. Each of us
is guarding their allocation, and as a result there seems to be some inertia. 11
Because they lack the huge downriver reservoirs that supply the lower basin, Colorado and
the other upper basin states feel they've already suffered more than their neighbors to the
south. Low irrigation flows on the upper tributaries of the Colorado have resulted in millions
of dollars' worth of lost crops and livestock sell-offs.
"In the upper basin there's been pain going on for some time, and that's of concern to
people," said Don Ostler, executive director of the Upper Colorado River Commission.
But the upper basin, where the river fills with snowmelt, is legally obligated to deliver a
certain amount of water to Arizona, California and Nevada. If it didn't, the lower basin could
make a "call on the river," and the upper basin could be forced to reduce deliveries to farms
and cities in order to send water south.
That would be a politically difficult move. To avoid it, upper basin interests are expected to
argue that if total water deliveries over the last decade are taken into account, they have
more than met their obligation to the lower basin.
The big grower-controlled irrigation districts that pump enormous quantities of water from
the river are also likely to feel the squeeze to sell some of their crop water to urban areas.
"If the drought gets worse, you're going to get a lot of pressure on those communities to
fallow land," said water attorney Bill Swan, who represents the Imperial Irrigation District in
southeastern California, the river's single biggest user.
3of4
In the lower basin, Nevada and Arizona would be the most vulnerable if a shortage was
declared. The huge project that Arizona built in the 1970s to ship Colorado water to the
state's interior farms and to Phoenix and Tucson has some of the most junior rights on the
river. Nevada also developed many of its rights after California.
"We will take the hits first," said Sid Wilson, general manager of the Central Arizona Project.
"Agriculture in Arizona will be hurt. We will not be able to continue storing water
underground, and we'll have to start pulling water out of the ground. But the point is, we're
not going under because of this drought."
The most worried of all is fast-growing southern Nevada, which gets most of its water from
Lake Mead. Even before the drought, the region needed more than its share to keep pace
with its exploding population.
The region's water agencies are proposing a mammoth project to pump groundwater from
rural parts of the state, spending millions paying homeowners to tear out their lawns to
reduce consumption and praying that the states will work out a deal. "I'd like to avoid if at
all possible a call on the river," said Mulroy of the Southern Nevada Water Authority. "That
makes no sense. To me, that's a declaration of war. We're going to wind up in the courts,
and going to court isn't going to solve the problem.
"This drought is real. It's difficult," she said. "But I'm going to be optimistic that there is
enough flexibility and enough possibility to avoid extraordinary pain."
4of4
Page 1 of3
Garrett, Gail
From: Cabral, Jennifer
Sent: Tuesday, October 12, 2004 7:41 AM
To: EMT
Cc: 130 -Communications Services
Subject: Article of Interest -10/12/04
Study: States too underfunded to prevent water pollution
By DON THOMPSON
Associated Press Writer
More than 30 years after passage of the federal Clean Water Act, many states lack the money
to provide enough regulation, according to a new study.
Budget problems mean California enforces just 23 percent of federal wastewater standards
and monitors just 60 percent of storm water regulations, according to Clifford Rechtschaffen,
director of San Francisco's Golden Gate University's environmental law program and co-
director of its Environmental Law and Justice Clinic.
The majority of the other 16 states he surveyed also had too little money to fully enforce the
key federal act, Rechtschaffen said in the study released Monday for the Center for
Progressive Regulation. The nonprofit group is made up of university professors with
experience in health, safety and environmental regulation.
The report comes at a time when environmental groups nationwide are pushing for more
enforcement.
Last week, environmental groups in Florida sued the state's Department of Environmental
Protection alleging it has done a poor job of enforcing the federal law over the last decade. The
federal suit asks that the U.S. EPA be ordered to control Florida's water pollution instead of
leaving it to the state.
Last month, the Environmental Integrity Project, a nonprofit advocacy group, said the federal
EPA and a half-dozen Great Lakes states are failing to enforce storm water runoff regulations,
threatening the regions' waterways and wildlife.
Under the 1972 Clean Water Act, the EPA delegated enforcement responsibility to the states
as they met certain criteria. Forty-five states now fully or partially enforce the law within their
boundaries.
Colleen Castille, Florida's environmental secretary, pointed out the federal government has
neither the money nor manpower to enforce the law in every state, which is why enforcement
was often delegated to states in the first place.
"The sorry truth is that the lack of enforcement by the states is undermining key provisions of
the law," Rechtschaffen said.
10/12/2004
Page 2 of3
He focused his survey on enforcement of the National Pollutant Discharge Elimination System,
under which states are supposed to issue permits to polluters. States were asked to list how
much money and staff they had for enforcing the permit system, and how much they would
need to do the job properly.
Seventeen states responded: Alabama, Arizona, California, Delaware, Florida, Georgia,
Hawaii, Maryland, Minnesota, Montana, North Carolina, New Jersey, Nevada, Oregon,
Washington, West Virginia, and Wyoming.
Eleven said they lack enough money. Georgia said it had just 20 percent of what it needed,
and Wyoming 29 percent.
California reported its regional water boards were finding it more difficult to reissue permits,
inspect polluters and enforce violations, and respond to public complaints.
The Natural Resources Defense Council urged the federal government to retake control of
California's storm water program in the late 1990s, arguing the state was doing a poor job, said
Alexis Strauss, regional director of the U.S. EPA's water division.
The federal government increased its scrutiny and encouraged the state to devote more
money to the program, she said. That strengthened state enforcement, but prompted some
cities to complain about the cost of compliance, a controversy still echoing today in the Los
Angeles area.
"States have had quite devastating budget consequences the last 10 years. They've dealt with
them in different ways, 11 Strauss said. Though comparing states' compliance is difficult because
they pursue differing enforcement policies, she said the U.S. EPA intends to try on a Web site
that should be available in another month or so.
The five states that said they have enough money -Alabama, Delaware, Florida, Nevada and
New Jersey-generally depend more heavily on fees paid by polluters, Rechtschaffen said. He
recommended other states follow their lead. One state did not report its funding.
The lack of money means many polluters are operating under old and inadequate permits, he
found. States often then fail to inspect the sites or punish excess discharges, and fines that are
levied are often too small to encourage compliance.
However, California two years ago began requiring penalties for repeat, serious violators,
which other research has shown has increased compliance.
Roadwork to lead to cleaner water
Construction along Coast Highway near Crystal Cove is expected
to help :filter runoff before it ends up in protected state park.
10/12/2004
Alicia Robinson
Daily Pilot
October 12, 2004
Page 3 of3
CRYSTAL COVE -A temporary inconvenience to drivers on Coast Highway by Crystal Cove State
Park is expected to result in long-term benefits to the environment.
Caltrans has narrowed Coast Highway by one lane between Los Trancos and Muddy creeks to construct
swales that will filter storm water before it is discharged into drainage facilities, Caltrans spokeswoman
Pam Gorniak said.
The $1.8-million project began in September and will be finished in February 2005. The swales are
shallow, trough-like depressions planted with a mixture of types of vegetation that will act as a natural
filter for highway runoff, which will then flow to the creeks, Gorniak said.
"This was a better approach to ensuring that the highway runoff doesn't go into [Crystal Cove] itself but
it goes into a discharge system," she said.
The project stems from a 2000 cease and desist order from the Santa Ana Regional Water Quality
Control Board. That year, water quality watchdog group Orange County CoastK.eeper sued the Irvine
Co. over runoff from a housing development into Crystal Cove, and that suit led the regional water
board to order the Irvine Co., the state parks department and Caltrans to control runoff in the area, said
CoastKeeper Executive Director Garry Brown.
"Our initial issue was that the area of water in front of Crystal Cove is designated as an area of special
biological significance-it means that it's a very special protected water," Brown said. "The law
stipulates you cannot discharge anything in or near [protected waters] that would degrade the water
quality Everything was just draining all the storm water into that [area]."
The state parks department and the Irvine Co. already have complied with the order to stop discharging
untreated runoff. Caltrans appealed to the State Regional Water Quality Control Board, which upheld
the regional water board's order, Brown said. The Coast Highway swale project is Caltrans' response to
the order.
Brown said he's glad to see the work get underway, although it took four years to get started.
"Finally in 2004 it's getting done," he said. "I'm just glad I wasn't holding my breath."
10/12/2004
Pipe prescription: Cut out the grease
City is talking to restaurants about disposal of oils,
fats, which clog sewers.
Alicia Robinson
Daily Pilot
October 16, 2004
NEWPORT BEACH -Clogged sewer pipes are a squeaky wheel in Orange County,
but grease is the last thing Newport Beach officials want to use to solve the problem.
To comply with new regulations from the Santa Ana Regional Water Quality Control
Board, the city is working to educate restaurant owners about how to keep fats, oils and
grease out of the pipes and could charge restaurants fees to cover new programs.
Oil and grease can cling to the inside of sewer pipes, causing clogs and eventually
sewage spills that can be the bane of swimmers and surfers.
In April 2002, the water board adopted a program to address sewage collection and
spills that included detailed standards for what sewage treatment agencies are
responsible for, and the program is being phased in through 2005.
"The genesis of this was that we had seen an increasing trend of sewage spills in
Orange County, and obviously there was a lot of concern about coastal water quality,"
water board spokesman Kurt Berchtold said. "Based on work we had done, we
identified a lack of effective operations and maintenance of sewage collection systems
as a cause of many of the sewage spills that we were seeing in Orange County."
Newport Beach has been an exception. Inspecting regularly, working with restaurants
and frequently cleaning the city's sewer lines -workers clean a total of 313 miles of
lines a year -have helped keep down the number of sewage spills in the last two
years, Assistant City Manager Dave Kiff said.
"There's not a lot of change from what we're doing now because we started to gear up
in anticipation of the new regulations," he said. "The big difference is we're going to ask
the City Council to pass along the restaurant-specific activities' costs."
The city is proposing a $15 to $20 annual permit for most of the city's 355 food service
businesses, a $100 to $150 annual fee for inspecting restaurants' grease interceptors
and possible cleaning costs for restaurants without them. The City Council would have
to approve any new fees.
Those possible charges have restaurant owners concerned. Proprietors of restaurants
are usually trained not to put grease or oil into sewage systems, and as part of an
industry that benefits the city with revenue and charity work, they don't want to be
penalized, said Dan Marcheano, owner of the Arches restaurant and head of the
Newport Beach Restaurant Assn.
"The point of view of the restaurant industry of Newport Beach is go after the bad
apples," he said. "Even a fee of a hundred dollars a year, that's a lot of money coming
out of the restaurant industry."
City officials are seeking input from restaurant owners, and they must have any new
regulations in place by January 2005. The issue could come before the council as soon
as Oct. 26.
While restaurant operators say they agree overall with the city's goals, they'll likely
oppose any new fees.
'We're hoping the City Council takes a look at our situation," Marcheano said. "I think if
the council comes up with something unacceptable, we're going to fill the City Hall."
TO:
FROM:
DATE:
SUBJECT
CALIFORNIA ASSOCIATION of SANITATION AGENCIES
925 L Street, Suite 1400 Sacramento, CA 95814 PH: (916) 446-0388 -FX: (916) 448-4808 www.casaweb.org
CASA Members
Executive Board
MEMORANDUM
Federal Legislative & Liaison Committee
Dave Williams, Chair
October 1, 2004
CASA Testifies On Clean Water Act Citizen Suits
On September 30, Mark Dellinger, Special Districts Administrator, Lake County Sanitation District
and CASA member testified before the House Committee on Transportation and Infrastructure,
Subcommittee on Water Resources and Environment on the continuing challenges that local
agencies are facing in the form of citizen suits that are considered redundant and effectively
frivolous. CASA was joined by Jere Melo, Mayor, Fort Bragg, and Chris Westhoff, Attorney, City
of Los Angeles. A copy of CASA's testimony is attached with this memorandum. Copies of the
hearing testimony and press information on the hearing can be found at the following site:
http://www.house.gov/transportation/ and clicking on the link under the Press Gallery Heading on
the right side of the web page.
Members across Party Lines Agree on Need for Action
Subcommittee Chairman Jimmy Duncan (R-TN), opened the hearing citing published reports in
the Santa Rosa Press Democrat of citizen suits that were identified as "green greed" because of
the effort to bring suit against public agencies that had either already been under an enforcement
order or were proceeding with efforts to remedy the identified violation. Duncan noted that in
many instances these communities were small and did not have the resources to follow through
on a full blown litigation strategy, requiring settlement as a cost-effective option even if the suit is
without merit. Referring to this situation, Duncan noted that the hearing was especially
noteworthy because it marked the first time that an entire hearing involved only California
witnesses. He advised that this may be because California has experienced abuses of the citizen
suit provisions of the Clean Water Act before other states. However, he indicated that recently he
learned of similar situations in his own state of Tennessee. He informed the witnesses that the
subcommittee viewed the matter seriously and represented a first step in attempting to preserve
the original purpose of the law. The Chairman also acknowledged the important leadership of
Representative Mike Thompson (D-CA) who has championed the effort to address the abuses of
the citizen suit provision.
Ensuring Clean Water For California
CALIFORNIA ASSOCIATION of SANITATION AGENCIES
925 L Street, Suite 1400 Sacramento, CA 95814 PH: (916) 446-0388-FX: (916) 448-4808 www.casaweb.org
In his opening statement, Thompson noted that the abuse of citizen suits is a real
problem. While not against the Clean Water Act's citizen suit provision, he
highlighted the fact that the litigation being filed with greater frequency is a different situation than
envisioned by Congress. He noted that the frivolous
suits lead to less resources being available to provide for improved water quality. In closing his
opening comments, he cited comments from the Willits Environmental Center's David Drell who
noted that abusive lawsuits could result in damaging the environmental movement.
Representative Gary Miller (R-CA) provided strong support for CASA and other communities
caught within the abusive practices of litigation. He noted that in an era of scarce resources and
increasing demands for infrastructure assistance, it is important to avoid situations where public
dollars are being diverted from the goal of improving water quality. Echoing earlier statements,
Miller indicated that it is important to address the abusive practices being used to provide local
communities with the support they need.
Representative Steven Pearce (R-NM) agreed with earlier comments and added that the abuse of
the citizen suit provision demonstrated again the need for action on tort reform. Representative
Vernon Ehlers (R-MI) stated that the Clean Water Act had made substantial improvements in the
nation's water quality and that while he supports citizen suits, it is clear that the abuses must be
addressed.
CASA Testimony Cites Importance of Citizen Suits but Highlights Abuses in Need of Policy
Review
In his opening statement, CASA member Mark Dellinger stated that there is no question that
citizen enforcement has played an important role in Clean Water Act implementation. However,
he noted that in recent years a cottage industry has developed in which suits are filed without
regard to the magnitude of the violation. Dellinger noted that in some instances, an attorney will
simply review an agency's NPDES reporting and based on no further research file or threaten to
file a suit. In other situations, he noted that a suit is filed for precisely the same violation that a
state is in the process of enforcing against but because a deadline has been missed, it triggers
the authority of a citizen suit. This places the agency in a position of having to divert scarce
resources to defend against this new suit as well as working with the state enforcement agency.
Dellinger offered the subcommittee a series of recommendations to remedy the abusive use of the
law. Specifically, he urged action to limit attorney fee awards to a proportionate share of a
successful suit. This he said would serve as a mechanism to make certain any suit filed was
carefully considered because of a potential for a less lucrative monetary award, which is an
important motivating factor for such suits. He also urged Congress to make fees reciprocal so the
prevailing party would benefit thereby establishing a level playing field for the defendant. Last, a
cap should be placed on the amount of the award. This would allow for an award that is
commensurate with the degree of the violation, making a community less likely to be subject to
"green greed."
Ensuring Clean Water For California
CALIFORNIA ASSOCIATION of SANITATION AGENCIES
925 L Street, Suite 1400 Sacramento, CA 95814 PH: (916) 446-0388-FX: (916) 448-4808 www.casaweb.org
In response to his testimonr, Thompson asked Dellinger whether one remedy
may include codifying a 1 s Circuit Court of Appeals decision that found an
agency could be immune from a citizen suit if it was under an enforcement order.
Dellinger noted that it would be a good start. He noted that currently a second court finding (9th
Circuit Court of Appeals) determined that only if a substantial penalty had been paid by the
violator would it be immune from a citizen suit. This has created different standards for different
regions of the country and it seemed appropriate for Congress to clarify this discrepancy.
Melo testified on how his community, Fort Bragg, had been subjected to abusive practices. He
explained that small communities, like Fort Bragg, are in no position to litigate as the costs are too
burdensome. He stated it is simply cost-effective to settle a threatened suit. He also noted that
in one instance, part of the settlement sought to make the community purchase a product
produced by one of the litigants. In response to this point, subcommittee members expressed
deep concern and amazement that the law was being used in such a manner and demonstrated
the importance of finding ways to remedy the situation.
Responding to the concerns of some environmental organizations over the examination of the
issue, Westhoff emphasized that neither he nor any of the other witnesses were recommending
the elimination of citizen suits. In fact, he noted that the City of Los Angeles had reached a
settlement through just such a process to address important needs. Instead, he suggested that
costs triggered by litigation, or the threat, imposed a serious resource drain on a community.
Rather than wasting resources in this manner, he hoped that a better way could be found to bring
about compliance that would ensure resources would be used to improve the environment.
In a series of exchanges with the subcommittee members, the witnesses heard a prevailing view
that the process of citizen suits had been hi-jacked and was becoming used in a manner never
envisioned by Congress. In closing the hearing, Chairman Duncan advised the subcommittee
that California is in the forefront of a major problem. He noted that the subcommittee would
continue to examine the matter.
Next Steps
The congressional hearing represented a significant step in CASA's effort to shed light on a
problem that is increasingly becoming more prevalent throughout the state and the nation. The
hearing successfully identified that a problem exists and that a remedy to address the abuses
must be developed. CASA will continue working with the subcommittee staff and Members to
provide additional information and assistance with the goal of finding an acceptable approach to
preserve the citizen suit provision while eliminating instances of "green greed" abuses.
Ensuring Clean Water For California
l\11NUTES
CALIFORNIA ASSOCIATION OF SANITATION AGENCIES
ANNUAL CONFERENCE
Hyatt Regency Monterey -August 4-7, 2004
Via Electronic Mail: 9124104
Wednesday. August 4. 2004
Conference registration opened at 9:00 a.m. on Wednesday, August 4, 2004. The California
Sanitation Risk Management Authority hosted a pre-conference workshop from 9:00-2:00 p.m. on
Sewer Backup Events & Your Restorations Contractor WHO JS REPRESENTING YOU?, The
Americans With Disabilities Act -Case Study of a Public Agency's Experience, Spills of Toxic or
Flammable Materials to your Collection System -WHAT WOULD YOU DO? The Budget & Audit
Committee held its annual meeting at 3:00 p.m., and a special meeting of the Executive Board
convened from 4:00 -5:00 p.m. The conference officially kicked-off with a welcome Icebreaker
Reception at 5:30 p.m., sponsored by the Water Environment Research Foundation (WERF).
Thursday. August 5, 2004
Registration opened at 7:30 am. The Technical (Air, Land and Water) Issues Forums, and the
Federal Legislative & Liaison Committee Meetings filled the morning program. Each Forum
provided infonnation regarding specific technical issues, listed below:
Air Issues Forum -(1) EPA' s 8-Hour Ground Level Ozone Designation and Impact on
California, (2) WERF Phase 3 Odor Study Update, (3) Experience with Super Ultra Low
Emission Vehicles and Zero Emission Vehicles
Land Issues Forum -(1) California Biosolids Program Update, (2) CASA Biosolids Program
Strategic Plan
Water Issues Forum -(1) Statewide Sanitary Sewer Overflow Guidance Committee Update,
(2) Why You Should Be Concerned About Interim Limits: 2010 -A Regulatory Odyssey, (3)
What Recent SWRCB Orders on NPDES Pennits Mean to You, (4) Draft Section 303(d)
Listing Guidance -Comments Due August 25, 2005
President John Coleman and Executive Director Mike Dillon presented an overview of the
Association for interested delegates during the New Members Orientation at 11 :30 am., and the
Communications Committee held a working lunch meeting from 11:45-1:15 p.m.
Vice President Bob Reid opened the conference General Session at 1 :30 p.m. and after welcoming
the delegation, he announced:
• Western Municipal Water District selected John Rossi as Westem's new General
Manager.
• CASA welcomed four new members since the Spring Conference; the cities of Santa
Rosa in Sonoma County and Stockton in San Joaquin County, and Trabuco Canyon
Water District in Orange County and new Associate member Wright Environmental
Management.
• Pre-conference registration totaled 290 Delegates and 40 Guests
-1 -
Annual Conference August 4-7, 2004
General Session MINUTES
Hyatt Regency Monterey
Page 2of2
• Blake Anderson, Orange County Sanitation District General Manager was not able to
attend the 49th Annual Conference as he will undergo open heart surgery in the near
future. Please keep Blake and his fiunily in your thoughts and prayers for his speedy
recovery.
Mr. Reid introduced Nominations Committee Chair Jean Mariani, who announced the 2004-2005
Slate of Officers on behalf of the Committee .. Ms. Mariani reminded the General Council that any
additional nominations from the floor would be accepted during the election on Friday afternoon.
Ms. Mariani reported the Nominations Committee recommended the following Slate of Officers.
OFFICE
President
1st Vice President/President Elect
2°d Vice President
Secretary/freasurer
Director at Large: 1.
2.
3.
4.
NOMINEE & AGENCY
Robert Reid, West Valley Sanitation District of Santa Clara
County
Charlotte Cravm Ventura Regional Sanitation District
Michael Dunbar, South Coast Water District
Tom Selfridge, Truckee Sanitary District
Kamil Azomy, Goleta Sanitary District
Charles Batts, Central Contra Costa Sanitary District
Harry Price, Fairfield-Suisun Sewer District
Wyatt Troxel Inland Empire Utilities Agency
The afternoon program featured a segment on What ,s New at Water Environment Research
Foundation, presented by James F. Stahl, followed by the announcement of the winners of the 2004
CASA Achievement Awards. Achievement Awards Committee Member Ron Young thanked
members for submitting applications and recognized the difficult task the Committee faced when
selecting the winning projects. Mr. Young thanked Committee members, who in addition to himself
were: Chair Blake Anderson, Orange County Sanitation District, Vice Chair Doug Wing, Carollo
Engineers, John Gundluch, Inland Empire Utilities Agency, Burt Michalczyk, Dublin San Ramon
Services District, Randy Musgraves, Central Contra Costa Sanitary District, Mike Thornton, San
Elijo Joint Powers Authority, Roland Williams, and Castro Valley Sanitary District. He referred
delegates to the Achievement Awards pamphlet that identified those agencies who submitted
applications in each category, and announced the 2004 Achievement Awards recipients as follows:
2004 TECHNOLOGICAL ACHIEVEMENT AW ARD
TRUCKEE SANITARY DISTRICT
FOR: ''Infiltration and Inflow Monitoring & Control Program"
Small Agency
CITY OF LOS ANGELES, BUREAU OF SANITATION Large Agency
FOR: "America's First Major Biosolids Producing Facility to Achieve Pathogen-free Standards -
Hyperion Treatment Plan: Class 'A' Program with Class 'A' Results"
?
2004 PUBLIC OUTREACH/EDUCATION AW ARD
LAS VIRGENESMUNICIPAL WATER DISTRICT AND
TRIUNFO SANITARY DISTRICT
FOR: "Community Compost Program"
COUNTYSANITATIONDBTRICTSOFLOSANGELES
FOR: "Residential Chloride Source Control Program"
2004 ORGANIZATIONAL INNOVATION AW ARD
VENTURA REGIONAL SANITATION DIS1RICT
FOR: "Saticoy Wastewater Collection and Treatment Improvements"
UNION SANITARY DISTRICT
FOR: "Integrated Financial Planning Model"
2004 ASSOCIATE ACHIEVEl\IBNT AW ARD
Small Agency
Large Agency
Small Agency
Large Agency
THE COVELLO GROUP, BROWN AND CALDWELL, AND WHITLEY BUCHETT &
ASSOCIATES
FOR: "Wastewater Treatment Plant Stage 4 hnprovements"
2004 SPECIAL l\IBRIT AW ARD FOR REGIONAL COOPORA TION
EAST BAY MUNICIPAL UI'ILITY DIS'IRICT, FAIRFIELD-SUISUN SEWER DISTRICT,
AND SAN FRANCISCO PUBLIC UTILITIES COMMISSION
FOR: "Preserving Biosolids Land Application in Solano County''
Mr. Young also reminded delegates that the Achievement Award winners will present their projects
during the Mid-Year Conference program in Palm Springs on January 19-22, 2005. The afternoon
session concluded with a presentation by the Communications Committee titled, So You 're Knee
Deep In Biosolids And What To Do About It!. The segment began with a mock public meeting,
followed up by a panel presentation based on the television show "Meet The Press" and featured the
"cast'' of Duane Sandul, Communication Committee Chair, Carol Beekman, Orange County
Sanitation District, Greg Chan, East Bay Municipal Utility Dmct, Joe Haworth, Los Angeles
County Sanitation Districts and Ruben Robles, Sacramento Regional County Sanitation District
along with several communication committee members.
Friday, August 6. 2004
Registration resumed at 7:30 a.m. The morning meetings began at 7:30 a.m. with the State
Legislative and Associates Committee Meetings.
The Directors and Managers Committees met separately from 9:00 a.m. to 12:00 p.m. Chair Lois
Humphreys, Leucadia Wastewater District, presided over the Directors Meeting, and introduced
CASA's Executive Director Mike Dillon, who presented the results of the Director's Compensation
Survey and an Update on the Ortiz Bill -What to Expect Next. Next up was California Special
Districts Association Executive Director Catherine Smith, whose presentation titled CSDA Special
District Governance Academy infonned Directors of the education offerings of the Governance
Academy followed by a personal testimony about the Academy from Stege Sanitary District Board
of Directors Member Al Miller. The Directors Meeting concluded with an Open Forum Discussion.
The Managers Committee Meeting, Chaired by Ron Young, Elsinore Valley Municipal Water
District, explored issues regarding the City of Fresno: Ground Water Nitrate Study And How To
Determine Septic Tank Conversions, presented by speaker Mark Y susi, Boyle Engineering. The
-l-
Annual Conference August 4-7, 2004
General Session MINUTES
Hyatt Regency Monterey
Page4of4
segment was followed by presentations from Sophia Skoda, Bartle Wells on Rate Setting
Approaches, Eric Sandler, San Francisco Public Utilities Commission, on Low Income Rates, and
Thomas E. Yeager, Kennedy/Jenks Consultants on Septic Tank Conversion Regulation Cesspool.
The meeting concluded with an open forum period for comments, questions, answers and general
discussion.
A special meeting of the Attorneys Committee began at 10:30 am., and featured a panel
presentation on Citizen Suits for Collection System Overflows: Avoiding Traps for the Unwary That
Can Cost Millions? The special session was followed by the regular Committee Meeting from noon
until 4:00 p.m.
The afternoon began with the Conference Luncheon. President John Coleman called to order the
Friday afternoon General Session and asked Nominations Chair Jean Mariani, to preside over the
election of officers. Ms. Mariani reminded the Council of the Committee's nominees and asked for
any additional nominations from the floor, of which there were none. The recommended 2004-2005
Slate of Officers was unanimously approved by the General Cmmcil.
The afternoon program featured keynote speaker Terry Tamminen, Secretary, California
Environmental Protection Agency, who addressed the delegation regarding The Administration's
Water Quality Policies. The afternoon session concluded with a panel presentation titled, Regional
Approaches to Reducing Overflows, which addressed issues pertaining to sanitary sewer overflows.
Moderator Mike Dunbar, South Coast Water District introduced panelists: Dick Dietmeier, South
Coast Water District, Doug Humphrey, Bay Area Clean Water Agencies, Ray Miller, Southern
California Alliance of POTWs and John Norton, State Water Resources Control Board.
The Program Planning Meeting and the ad hoc Salaiy Survey Committees convened from 4: 15 -
5:00 p.m., and the President's Reception at 6:00 p.m. concluded Friday's conference program.
During the reception, CASA's Executive Director Mike Dillon and Federal Liaison & Legislative
Committee Chair Dave Williams presented President Coleman with a Joint Senate and Assembly
Resolution from State Senator Torlakson and Assemblyman Canciamilla and a Congressional
Record introduced by Representative Ellen Tauscher that honored John's leadership as the 2002-
2004 President of the California Association of Sanitation Agencies. Both declarations commended
John for his commitment as a public steward of local communities' natural resources in California,
and conveyed sincere best wishes for continued success in the future as he concluded his tenn as the
46th President of CASA.
Saturday, August 7. 2004
Committee Chairs/Vice Chairs reported Committee action items during the Executive Board
Meeting held from 7:30-9:00 a.m.
President John Coleman called the General Session to order at 9:00 am. Michael Segala, Fairfield-
Suisun Sewer District, led the salute to the flag, followed by the detennination of the presence of a
quorum.
Approval of Minutes
President Coleman asked for additions or corrections to the minutes from the May I, 2004 General
Session Meeting. The General Council approved the minutes as electronically mailed.
Annual Conference August 4-7, 2004
General Session MINUTES
Hyatt Regency Monterey
Page SofS
Treasurer's Report
Bob Reid reported on behalf of Interim Secretary-Treasurer Tom Selfridge, who was not present,
and referred to the fiscal year-end Treasurer's Report-June 30, 2004, the Proposed 2004/2005
Association Budget by Fund, and Resolution No. 191 -establishing CASA Dues for Calendar Year
2005 that were distributed to the General Council. Mr. Reid noted the Treasurer's Report proposed
2004/2005 Association Budget and Dues Resolution were before the General Council for vote, and
pursuant with CASA's Bylaws, were recommended by the Executive Board for adoption by the
General Council. Mr. Reid addressed the following key points.
1. The Treasurer's Report details revenues/expenses in each special fund along with the
'general operating' fund that CASA administers and reports the Association's sound
financial health.
2. Overall, the proposed 2004/2005 Association Budget revenue/expenses project virtually no
changes from last year.
3. The Dues Resolution included the automatic annual dues escalation of 1.4%, based on the
San Francisco Bay Area CPI from June 2003-2004. Resolution No. 191 established CASA
dues for calendar year 2005.
The General Council unanimously approved receipt and filing of the fiscal year-end Treasurer's
Report -June 30, 2004, and adopted the proposed 2004/2005 Association Budget and Dues
Resolution No 191.
President's Report
President John Coleman thanked Board members, committee chairs, vice chairs and staff for all of
their help and hard work over the past two-years. President Coleman shared the following general
announcements:
The Executive Board will meet on October 28-29, 2004, for the annual Strategic Planning
Retreat at East Bay Municipal Utility District, Pardee Resetvoir, to continue efforts on the
Association's Succession Plan. The Board plans to report to the membership about CASA's
ongoing strategic planning efforts at the Mid-Year Conference in January 2005.
President Coleman asked Executive Board Member and Past President Rich Luthy, Fairfield-
Suisun Sewer District, to stand and be recognized as this is his last official session as a
member of CASA's Executive Board. Mr. Coleman thanked Rich for his diligent work on
the Board and his dedication to the Association, which was followed by a round of applause.
President Coleman recognized and thanked Awards Committee Chair Blake Anderson,
General Manager, Orange County Sanitation District ,who was not present, but nevertheless,
prepared the CASA Awards Program and Presentation . He asked that we send our best
wishes and prayers to Blake as he prepares to undergo heart surgery in the near future.
President Coleman recognized Conference Arrangements Chair Joyce Gwidt and Federal
Legislative Advocate Eric Sapirstein along with the CASA staff for planning this year's first
Federal Legislative Outreach Seminar in Washington, D.C. Mr. Coleman announced that
CASA will schedule a 2005 Washington, D.C. Conference tentatively in April, and noted
that the CASA office will keep members infonned about next year's conference dates as
soon as they are final.
Annual Conference August 4-7, 2004
General Session MINUTES
Hyatt Regency Monterey
Page6of6
President Coleman urged delegates to complete the Evaluation Fonns and tum them in at the
registration table. The evaluations are a useful tool for the program planning and conference
arrangement committees when evaluating programs and facilities for conferences. John
Coleman thanked Joyce Gwidt as Chair of Conference Arrangements, and staff for their
diligent planning of conferences and hotel properties.
In conclusion, President Coleman thanked the General Council for their support to re-elect
the Executive Board and recognized that the past two years marked a unique period for
CASA and has been personally a wonderful experience, which was followed by a round of
applause.
Executive Director's Reoort
Mike Dillon referred the Council to his written Executive Director's Report, which was distributed
with the agenda and was available to delegates during the conference at the registration table. He
briefly discussed several legislative issues including the State's Budget; Local Government-Property
Tax; CASA Executive Board Supports Prop. IA and neutral position on Prop. 65, Credit to
CSDA's Catherine Smith and LOCAL Coalition negotiating the initial local government
"compromise"; CASA Sponsored AB 474-Salinas-Record Retention, SB 1272-0rtiz and AB 2633-
Frommer -Grease "neutral" position. The Executive Director's Report also included a legislative
bill swnmary report.
Legal and Regulatory Affairs Report
Bobbi Larson recognized the Chairs of the Air, Land and Water Technical Forums, Alex Coate, Ed
McCormick and Jim Kelly, and thanked them for their dedicated efforts in preparing program
agendas that are informative and well presented. Ms. Larson especially thanked outgoing Air Issues
Forum Chair Alex Coate and Attorneys Committee Chair Tony Trembley for their individual
contributions to the respective committees.
Ms. Larson reported on a few key issues with implications for CASA agencies. She informed the
General Collllcil that further detail could be found in the Regulatory Bulletin and the Legal Affairs
Update.
SWRCB COLLECTION SYSTEM GUIDANCE
The Sanitary Sewer Overflow (SSO) Guidance Committee continues to meet monthly. The
Committee was formed to assist the SWRCB in developing statewide approach to controlling
and reducing SSOs. The Committee is composed of representatives from the environmental
community, regional water quality control boards, local health officers, the U.S.
Environmental Protection Agency, as well a several representatives of cities and special
districts that own and operate sewer collection systems. To assist the SWRCB in developing
the statement of principles, Tri-TAC has prepared a draft resolution in support of a
collaborative approach to reducing SSOs that could be adopted by the SWRCB. Both CASA
and Tri-TAC would like to reach agreement with the Committee on a general resolution that
sets forth key principles, and continue to work on specific details. The Attorneys Committee
will feature a citiz.en suits presentation regarding collection system overflows at the January
2005 conference.
303 (D) LISTING POLICY AND TMDL DEVELOPMENT GUIDANCE
On July 22, 2004, the SWRCB released for public comment its much-awaited revised draft
"Water Quality Control Policy for Developing California's Section 303(d) List''. Despite
"
Annual Conference August 4-7, 2004
General Session MINUTES
Hyatt Regency Monterey
Page7of7
concerns about some of the provisions, CASA and others in the regulated community
generally supported the December 2003 Draft, viewing it as a significant step toward
increasing both the scientific rigor and the transparency of listing decisions. Unfortunately,
the revised version of the policy represents a step backward from the scientific rigor and
transparency of the earlier version. The SWRCB will hold a workshop on the draft policy
on September gth in Sacramento and written comments regarding the policy are due by
August 25, 2004. Bobbi Larson encouraged members to send comments to her attention
before August 25th.
GOVERNOR'S CALIFORNIA PERFORMANCE REVIEW (CPR)
The CPR has a long way to go! Mike Dillon and Bobbi Larson will be working to develop
comments on the proposed reorganization of the Regional and State Boards and will keep
members infonned of developments.
Biosolids Program Report
Marlaigne Hudnall reported that the State Water Resources Control Board (SWRCB) adopted the
General Order (GO) for the Land Application ofBiosolids on July 22, 2004. The GO allows for
continued land application of both Class A and Class B biosolids in California via a general pennit
mechanism. Ms. Hudnall noted that significantly the GO includes a policy statement at the direct
request of the SWRCB Board, and after much negotiation with their staff: explicitly the statement
articulates the SWRCB's support of the beneficial use ofbiosolids. This policy statement is the first
of its kind in California as well as in the majority of the United States, and is an important precedent
as it provides a solid basis for local and other policy discussions and is based on an extensive review
of current science. Ms. Hudnall noted that feedback on a national level is overwhehningly in
support of the policy statement.
Committee Reports
Attorneys
Chair Tony Trembley reported that the Committee hosted a special Attorneys session on Citizen
Suits for Collection System Overflows: Avoiding Traps for the Unwary that Can Cost Millions. Mr.
Trembley noted the Committee plans to present a similar panel discussion regarding citizen suites
for the general membership at the January 2005 conference.
Mr. Trembley reported that the Committee recommended and the Executive Board approved that
CASA request the publication of the Court of Appeal opinion in Rincon de/ Diablo Municipal Water
District et al. v. San Diego County Water Authority. Mr. Trembley noted the case favorably
addressed two issues of substantial interest to CASA member agencies and their ratepayers.
Mr. Trembley reported that the Committee recommended and the Executive Board approved CASA
joining with the League of California Cities (LOCC) in filing an amicus curie brief in the Supreme
Court regarding the statute of limitations for unfair labor practice claims in the case of Coachella
Valley Mosquito & Vector Control District v. California Public Employment Relations Board. At
issue is whether the statute for filing an unfair labor practice charge is three months or three years.
Mr. Trembley reported that the committee continues to review legislation and recommended an
"oppose" position regarding AB 2713-Pavley-Public Agency Attorneys/Attorney-Client Privilege.
Lastly, Mr. Trembley extended his thanks to President Coleman, the Executive Board and CASA
staff for their support. He recognized that CASA is fortunate to have the professional services of
7
Annual Conference August 4-7, 2004
General Session MINUTES
Hyatt Regency Monterey
Page 8 of8
Mike Dillon and Bobbi Larson, noting that it was a pleasure to work with them and that their
distinguished reputations for quality of work and credibility is well known.
Communications
President Coleman reported on behalf of Chair Duane Sandul, who was not present, that seven
member agencies were involved in this year's successful Communications Committee presentation
titled "So You're Knee Deep in Biosolids and What To Do About It!". Mr. Sandul reported that the
Committee established a subcommittee to catalog infonnation gathered in last year's CASA's Public
Relations Survey. Once cataloged the survey is scheduled to be posted on CASA's website.
Federal Legislative
Chair Dave Williams reported that as a result ofCASA's first Washington D.C. Seminar,
Representative Mike Thompson (D-CA) has requested CASA testify at a congressional hearing in
September of the House Committee on Transportation and Infrastructure, Subcommittee on Water
Resources and Environment regarding the Clean Water Act citizen suit issue. The purpose of the
hearing will be to clarify the policy issues of concern to the regulated community, and explore
possible remedies to prevent future abuses. Mr. Williams reported CASA will draft a paper that
identifies instances where such nuisance suits have been filed against public agencies, and he urged
members to send examples of citizen suit abuses to Eric Sapirstein or Bobbi Larson. Mr. Wdliams
also reported that CASA will send a representative from the Attorneys Committee and a
representative from an Agency member to testify before the Subcommittee hearing.
Managers
Chair Ron Young reported that CASA seeks ideas for the celebration of its soth Anniversruy, and he
requested members contact the CASA office with their suggestions.
State Legislative
Outgoing Chair Charlotte Craven urged those interested in state legislation to join and participate in
the Committee meetings. Interested members can sign up by contacting the CASA staff.
Tri-TAC
Chair Sharon Green reported on recent Tri-TAC activities. She noted that the Committee is involved
in activities regarding the California Ocean Plan, changes in the State Implementation Policy for
Toxics (the "SIP''), collaboration with the Solid Waste Management Board and the Air Resources
Board. Ms. Green encouraged members to visit the Tri-TAC website which contains a wealth of
infonnation that represents California public wastewater management agencies.
Ms. Green thanked CASA members who pledged to the Ca1/FOG Workgroup appeal for funding.
Those interested in the FOG workgroup can visit Tri-TAC's website www.tritac.org. which has a
section dedicated to FOG material. Ms. Green noted that pledges are still needed and members can
contact the CASA office to obtain the infonnation about making a contribution.
The Last Order of Business
In conclusion, outgoing President John Coleman turned the gavel over to incoming President Robert
R. Reid. Mr. Coleman thanked the General Council for supporting CASA's Executive Board,
Committee Chairs and staff: who accomplished positive changes on behalf of the Association.
The meeting adjourned at I 0:00 a.m.
.. -
•
CALIFORNIA ASSOCIATION of SANITATION AGENCIES
925 L Street. Suite 1400 Sacramento. CA 95814 TEL: (916) 446-0388-FAX (916) 448-4808
The California Performance Review
c/o Office of Governor Schwarzenegger
State Capitol
Sacramento, CA 95814
September 24, 2004
Attn: Billy C. Hamilton, Co-Executive Director
Chon Gutierrez, Co-Executive Director
SUBJECT: COMMENTS REGARDING REPORT OF THE
CALIFORNIA PERFORMANCE REVIEW-STATE
WATER RESOURCES CONTROL BOARD AND
REGIONAL WATER QUALITY CONTROL BOARDS
Dear Members of the California Performance Review Commission:
The California Association of Sanitation Agencies (CASA) is pleased to provide
comments regarding the reforms proposed by the California Performance Review.
CASA is a statewide non-profit association of local public agencies that provide
wastewater collection, treatment, disposal and recycling services to millions of
Californians. Our member agencies are regulated by the State Water Resources Control
Board (SWRCB) and the nine Regional Water Quality Control Boards, and our
comments focus on the recommendations related to these boards.
For some time now, CASA has been concerned that the Regional Board system is
not functioning effectively. A significant number of municipal permits, enforcement
actions and other orders by the Regional Boards have been petitioned to the SWRCB, and
challenged in court, in the past five years. Wastewater discharge permits being issued to
municipalities often require the implementation of very costly improvements that will
result in minimal, if any, water quality benefit. Permit applicants are precluded from
communicating with Regional Board members about their concerns outside the hearing
process, which is often truncated and does not allow a full and fair discussion of the
issues presented by the complex, lengthy and very detailed proposed permits. In many
cases, the Regional Boards and their staffs view the municipalities as recalcitrant
polluters rather than as partners in water quality improvement. The water quality
Ensuring Clean Water for California
The California Performance Review
c/o Office of Governor Schwarzenegger
September 24, 2004
Page2
standards program in the state is dormant, and as a result, unreasonable permits are issued
to implement outdated and inappropriate requirements.1
The problems with the current system are very real. While CASA has not taken a
position regarding the structural reforms proposed in the CPR report-eliminating the
SWRCB and Regional Boards in favor of a line department approach-we are
encouraged that the effectiveness of the current system is being examined. Toward that
end, CASA has developed a set of core principles that we believe must guide and inform
any structural or process changes in the State's water quality planning, regulatory and
enforcement programs.
• Interested stakeholders, including the regulated community, must have access to
decision-makers who will render decisions that will significantly affect their
operations, activities and economic viability. Artificial constraints on information
exchange and communication must be eliminated.
• Decision-makers, whether Department staff or appointed Board members, must
be qualified and equipped to make the complex technical decisions with which
they are faced.
o For the most part, the existing lay Regional Boards are not qualified to
evaluate the staff proposals for permitting, total maximum daily loads, basin
planning, and enforcement. Appointees must possess the requisite expertise,
and be adequately compensated and able to devote the time required to render
thoughtful and reasoned decisions, or the Boards should be eliminated.
o Similarly, the boards are losing well-qualified staff. The State should provide
a competitive compensation system to Board staff to attract and retain the best
and brightest scientists, engineers, and policy professionals.
• Interested stakeholders, including the regulated community, must have an
opportunity for a full and fair hearing on all matters before the Boards.
o On all permitting and enforcement matters, the procedures for hearing
must be clearly articulated and adhered to. Currently, the Board Chairs
have broad discretion to severely limit hearings, even though this may be
the only true hearing on the merits that the matter will receive.
o The affected parties should be entitled to a fair hearing as a matter of right
and the option to waive a formal hearing. A full and fair hearing must
include:
Adequate time to present the case;
1 The problems with the State's water quality standards program are outlined in a white paper prepared by
the California Coalition for Clean Water (CCCW) titled "Reassessing California's Water Quality
Program. " CASA is a member of the CCCW.
Ensuring Clean Water for California
The California Performance Review
c/o Office of Governor Schwarzenegger
September 24, 2004
Page3
Adequate opportunity to cross examine Regional Board staff and other
parties; and
An opportunity to submit and rebut evidence.
o An objective decision-maker, such as special environmental appeals board
or other independent decision-maker, must render the final decision.
o The parties should have an opportunity to engage in pre-decision
mediation or alternative dispute resolution. Ironically, many permit and
enforcement issues seem to be resolved after litigation is filed in ways that
were resoundingly rejected as improper by the Boards prior to the lawsuit.
• The current petition process, which allows the SWRCB complete discretion over
whether to consider issues raised in a permit or enforcement action, should be
replaced with a right to appeal. Appeals should follow the full and fair hearing
principles discussed above. Under the current petition process, many issues are
not being resolved and interested parties are being forced to litigate these
unresolved issues.
• Fees for regulatory programs should not be shifted to fund other programs of
general or special benefit. The ability of the regulated community to absorb fee
increases is not unlimited.
• The problems with California's basin planning and water quality standards
programs cannot be ignored any longer. Ensuring that water quality standards are
appropriate and reflect each water body's site-specific conditions must be the
centerpiece of the State's water quality program, whether implemented by staff,
independent Boards, or via contract. The Boards must move forward with Basin
Plan reviews and revisions as a top priority. We were pleased to see the
importance of Basin Planning acknowledged in the CPR Report.
• The Boards' current dysfunctional system of state contracting must be replaced
with a streamlined, efficient and timely process for entering into both interagency
and outside contracts. Our experience has demonstrated that it is far easier to
contract with the federal government than with the SWRCB.
In addition, we cannot overemphasize the importance of achieving a fundamental
shift in the way that the Boards and their staffs view local government. Local public
agencies take very seriously their responsibilities as partners in protecting water quality,
yet the experience of our members is that they are often treated with mistrust and
suspicion by the regulators. We recognize that some individual agencies have been less
than exemplary in their planning and operations, but these entities represent the
exception, not the rule. We urge the CPR Commission to identify a mechanism or
process for the water quality regulators and local wastewater agencies to identify and
Ensuring Clean Water for California
The California Performance Review
c/o Office of Governor Schwarzenegger
September 24, 2004
Page4
develop opportunities to work together as partners. As a result of a command and control
philosophy and a seeming disregard for the concerns of communities and their ratepayers,
California is expending far too many resources on non-problems while real water quality
issues go unaddressed.
Thank you for your consideration of our comments. Please contact Roberta
Larson, CASA' s Director of Legal and Regulatory Affairs at (916) 446-7979, if you
would like to discuss our recommendations.
RRR/jlp
Sincerely,
:£?~
Robert R. Reid
President
cc: Paul Miner, Office of the Governor
Moira Topp, Office of the Governor
Cynthia Bryant, Office of the Governor
Arthur G. Baggett, Jr., Chair, SWRCB
Craig M. Wilson, Esq., Chief Counsel
Celeste Cantu, Executive Director
CASA Executive Board
Mike Dillon, Executive Director
Roberta Larson, Director, Legal & Regulatory Affairs
Ensuring Clean Water for California
,,
AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
October 27, 2004-7:00 P.M.
Agenda Posting : In accordance with the requirements of California Government Code Section
54954.2, this agenda has been posted in the main lobby of the District's Administrative offices not
less than 72 hours prior to the meeting date and time above . All written materials relating to each
agenda item are available for public inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to
the Board for discussion and/or action, it will be done in compliance with Section 54954.2{b) as an
emergency item or because there is a need to take immediate action, which need came to the
attention of the Board subsequent to the posting of agenda , or as set forth on a supplemental
agenda posted in the manner as above, not less than 72 hours prior to the meeting date.
Accommodations for the Disabled : The Board of Directors Meeting Room is wheelchair accessible.
If you require any special disability related accommodations, please contact the Orange County
Sanitation District Board Secretary's office at (714) 593-7130 at least 72 hours prior to the
scheduled meeting . Requests must specify the nature of the disability and the type of
accommodation requested .
Items Continued: Items may be continued from this meeting without further notice to a Committee
or Board meeting held within five (5) days of this meeting per Government Code Section
54954.2(b)(3).
Meeting Adjournment: This meeting may be adjourned to a later time and items of business from
this agenda may be considered at the later meeting by Order of Adjournment and Notice in
accordance with Government Code Section 54955 (posted within 24 hours).
1. Invocation and Pledge of Allegiance
2 . Roll Call
3 . Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, if any. (See listing in Board Meeting folders)
4. Appointment of Chair pro tern , if necessary
10/27/04
Page 2
5. Public Comments: All persons wishing to address the Board on specific agenda items or
matters of general interest should do so at this time. As determined by the Chair,
speakers may be deferred until the specific item is taken for discussion and remarks
may be limited to three minutes .
Matters of interest addressed by a member of the public and not listed on this agenda
cannot have action taken by the Board of Directors except as authorized by Section
54954 .2(b ).
6. The Chair, General Manager and Genera l Counse l present verbal reports on
miscellaneous matters of general interest to the Directors . These reports are for
information only and require no action by the Directors .
a. Report of Chair; consideration of Reso lutions or commendations,
presentations and awards
b. Report of General Manager
c. Report of General Counsel
7. If no corrections or amendments are made, the minutes for the regular meeting held on
September 22, 2004 will be deemed approved as mailed and be so ordered by the
Chair.
8. Ratifying payment of claims of the District, by roll call vote, as follows:
ALL DISTRICTS 09 /15/04 09/30/04
Totals $23,643,437.08 $12,735,711.95
DIRECTORS: Pursuant to Government Code Section 84308, you are required to disclose
any campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving OCSD. This requ ires that you identify the contributor by name.
Further, you may not participate in the decision making process to award a contract to such
party. For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with OCSD. For the specifics of Government Code Section 84308,
please see your Director's Handbook or call the office of General Counsel.
~'
fl I
CONSENT CALENDAR
10/27/04
Page 3
All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the
Consent Calendar by a Director, staff member or member of the public in attendance, there will
be no separate discussion of these items. All items on the Consent Calendar will be enacted
by one action approving all motions, and casting a unanimous ballot for resolutions included on
the consent calendar. All items removed from the Consent Calendar shall be considered in the
regular order of business.
Members of the public who wish to remove an item from the Consent Calendar shall, upon
recognition by the Chair, state their name, address and designate by number the item to be
removed from the Consent Calendar.
The Chair will determine if any items are to be deleted from the Consent Calendar.
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. Receive and file Summons and Complaint, Orange County Transportation
Authority v. Orange County Sanitation District, et al, Orange County Superior
Court Case No. 04CC09849, re Complaint in Eminent Domain; and authorize the
General Counsel to appear and defend the interests of the District.
b Receive and file Summons and Complaint, Southern California Edison Company
v. Orange County Sanitation District and Steve P. Rados, Inc., Orange County
Superior Court Case No. 04WL05251, re Complaint for Damages in connection
with the Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4; refer to Contractor
and Contractor's Insurer to defend and indemnify the District; and authorize the
General Counsel to appear and defend the interests of the District in the event of
Contractor's failure to appear and respond to the Complaint within the time
required.
c. Approve an "A" Street Pump Station Landscaping, Parking and Easement
Agreement with the city of Newport Beach, in connection with Rehabilitation of
"A" Street Pump Station, Contract No. 5-52, in a form approved by General
Counsel.
END OF CONSENT CALENDAR
10. Consideration of items deleted from Consent Calendar, if any.
COMMIITEE REPORTS AND RECOMMENDED ACTIONS
11 . STEERING COMMITTEE
Consent Calendar
10/27/04
Page4
a . Order draft Steering Committee Minutes for the meeting held on September 22 ,
2004 to be filed.
Non-Consent Calendar
b. Review and consideration of agenda items considered by the Steering
Committee re the October 27, 2004 meeting.
c . Consideration of items deleted from Steering Committee Consent Calendar, if
any .
12. OPERATIONS . MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
OMTS Consent Ca lendar
a. Order draft Operations , Maintenance and Technical Services Committee Minutes
for the meeting held on October 6 , 2004 to be filed .
OMTS Non-Consent Calendar
b. Consideration of items deleted from OMTS Committee Consent Ca lendar, if any
13 . PLANNING, DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. Order draft Planning, Des ign and Construction Committee Minutes for the
meeting held on October 7, 2004 to be filed .
b. (1) Ratify Change Order No. 1 for Anaerobic Selector Mixing Systems, Job
No. SP-74, with DenBoer Engineering and Construction , Inc ., authorizing an
addition of $25,607 and a time extension of 237 calendar days, increasing the
total contract amoun t to $470 ,607 ; and ,
(2) Accept Anaerobic Selector Mixing Systems , Job No. SP-74, as complete, and
approve the Final Closeout Agreement.
c. Ratify Change Order No. 15 to Primary Clarifiers 16-31 and Related Facilities ,
Job No. P1-37 , with Margate Construction , authorizing an addition of $67 ,937
and 143 calendar days, increasing the total contract amount to $71,377,380.
d. Ratify Change Order No . 4 to Warner Avenue Rel ief Sewer, Contract No . 11-22,
with ARB, Inc., authorizing an addition of $47,616, increasing the total contract
amount to $5,506,958 .
e. Ratify Change Order No . 1 to Secondary T reatment Facilities Process Upgrades
at Plant No . 2 , Job No. P2-47-3, with Morrow-Meadows Corporation , authorizing
an addition of $205,903, increasing the total contract amount to$ 4,917,903 .
.,
'
.,
f.
g.
h.
10/27/04
Page 5
Ratify Change Order No. 3 to Trickling Filter Rehabilitation and New Clarifiers,
Job No. P1-76, with J.R. Filanc Construction Company, Inc., authorizing an
addition of $123,258, increasing the total contract amount to $33,075,853.
Approve Amendment No. 1 to the Professional Services Agreement with SPEC
Services, Inc. for Plant No. 1 Plant Water VFD Replacement, Job No. SP-94,
providing for additional engineering services, for an additional amount of
$26,384.58, increasing the total amount not to exceed $115,863.58.
(1) Approve time extensions to Cooperative Projects Grant Program contracts
with the Cities of Anaheim (Contract Nos. 0202, 0301 and 0302) and Orange
(Contract No. 0130); and,
(2) Approve Orange County Sanitation District fund ing for Cooperative Projects
for Fiscal Year 2004-05 , totaling $2 ,386,537, as recommended by the
Cooperative Projects Grant Committee.
i. Approve Professional Services Agreement with Dudek & Associates , Inc. for
engineering services for the Rehabilitation of District Siphons, Contract No. 2-68,
for an amount not to exceed $987, 156.
PDC Non-Consent Calendar
j. Consideration of items deleted from PDC Committee Consent Calendar, if any
14. FINANCE . ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHR)
FAHR Consent Calendar
a. Order draft Finance, Administration and Human Resources Committee Minutes
for the meeting held on October 13, 2004 to be filed.
b. Receive and file Treasurer's Report for the month of September, 2004.
c. Approve SAFETY-POL-402 , Workers' Compensation Benefits and Leave
Program, as provided for in Resolution No. OCSD 02-5, regarding the District's
Injury and Illness Prevention Program Policy.
d. Approve SAFETY-POL-404 , Early Return To Work Program, as provided for in
Resolution No. OCSD 02-5, regarding the District's Injury and Illness Prevention
Program Policy.
e . (1) Approve the Agreement to Terminate Collection of Sewer Connection
Charges with the City of Westminster for the collection of capital facilities
capacity charges , in a form approved by General Counsel; and,
(2) Approve the Agreement for Collection of Capital Facilities Capacity Charges
with the Midway City Sanitary District, in a form approved by General Counsel.
10/27/04
Page 6
f. (1) Approve a Lease Agreement with Nautical Yacht Sales for the period of 21
months, commencing September 1, 2004 through May 31, 2006, at the rate of
$5,000 per month for a portion of the site acquired by the District for the new
Rocky Point Pump Station ; and ,
(2) Approve an Office Lease Agreement with John R. Finnell on a
month-to-month basis, commencing September 1, 2004, at the rate of $250 per
month for a portion of the site acquired by the District for the new Rocky Point
Pump Station .
FAHR Non -Consent Calendar
g. Consideration of items deleted from FAHR Committee Consent Calendar, if any
15. GWR SYSTEM STEERING COMMITTEE (GWRSSC)
GWRSSC Consent Calendar
a . Order Joint Groundwater Replenishment System Cooperative Committee
Minutes for the meetings held on September 13 and 27 , and October 11, 2004 to
be filed .
b. Approve a Professional Services Agreement with Porter Novelli, providing for one
year of additional services for the public information and outreach program for
the Groundwater Replenishment System, Job No . J-36, for an amount not to
exceed $615 ,000, to be equally cost shared with the Orange County Water
District.
GWRSSC Non-Consent Calendar
c. Consideration of items deleted from GWRSSC Consent Calendar, if any.
NON-CONSENT CALENDAR
16. Ordinance No. OCSD-25, An Ordinance of the Board of Directors of Orange County
Sanitation District, Adopting Fats, Oils and Grease Control Regulations Applicable to
Food Service Establishments:
a . Motion to read Ordinance No. OCSD-25 by title only and waive reading of said
entire ordinance. (The waiver of the reading of the entire ordinance must be
adopted by a unanimous vote of Directors present.)
b. Motion to introduce Ordinance No . OCSD-25, and pass to second reading and
public hearing on November 17, 2004.
17. Ordinance No. OCSD-24 , An Ordinance of the Board of Directors of Orange County
Sanitation District, Adopting Revised Table G re Permittee Charges for Use and
Reaffirming All Other Charges:
"An Ordinance of the Board of Directors of Orange County Sanitation District
Establishing Sanitary Sewer Service Charges; Establishing Capital Facilit ies
10/27/04
Page 7
Capacity Charges ; Adopting Miscellaneous Charges and Fees relating to
Industrial Charges, Source Control Permittees and Wastehaulers; and Repealing
Ordinance No . OCSD-22 ".
a . Motion to read Ord inance No . OCSD -24 by title only and waive reading of said
entire ordinance. (The wa iver of th e read ing of the en t ire ordinance must be
adopted by a unanimous vote of Directors present.)
b. Motion to introduce Ord inance No. OCSD-24, and pass to second reading and
public hearing on November 17 , 2004 .
18 . Ratify the use of the General Manager's emergency purchasing authority pursuant to
Resolution No. OCSD 04-08 , to take actions necessary for the Emergency Repa ir of the
Santa Ana River Interceptor, Contract No . 2-41-3, in an amount not to exceed $350,000.
19. Closed Session
CLOSED SESSION : Du ring the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations , pend ing or
potential litigation , or personnel matters, pursuant to Government Code Sections
54956 .8 , 54 956.9, 54957 or 54957.6, as noted .
Reports relat ing to (a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives ; or which are ex empt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted closed
session and are not available for public inspection . At such time as the Board takes
final action on any of these subjects , the minutes will reflect all required disclosures
of information .
a. Convene in closed session , if necessary
1. Confer with General Counsel re pending litigation , Santa Ana Watershed
Project Authority v . Orange County Sanitation District, Orange County
Superior Court Case No. 04CC06197 , Government Code Section
54956.9.
2 . Confer with General Counsel re pending l itigation , Orange County
Sanitation District v . Santa Ana Watershed Project Authori ty , Orange
County Superior Court Case No . 04CC011345, Government Code
Section 54956.9.
3 . Confer with General Counsel -Anticipated Litigation . Government Code
Section 54956.9(b) -One Matter.
b. Reconvene in regular session
c. Consideration of action, if any, on matters considered in closed session
20 . Matters which a Director may wish to place on a future agenda for action and
staff report.
21 . Other business and communications or supplemental agenda items, if any
10/27/04
Page 8
22 . Future Meeting Date : The next Board of Directors regular meeting is scheduled for
November 17, 2004, at 7:00 p.m.
23. Adjournments
:••••••••••••••••••OOO oOoo Ooo.,OOoOooo oooooo ooooo oooooO•••••••.ooooo•oo ooooo ... o.ooo ooooooouoo ooooooooooo oooo.oooooooo•oo ooooooooooHoooooooooooooooo ooooooooooo•Ooooo oooooooo ooooo o.ooo oooooooo.ooooooooooooooooooouoo oooOOOOoOOOO•o••oOoo•••••••O•oOOOooOooOooooooo ooo ou oo ... 000000000000":
j NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the Board of j
j Directors, items shall be submitted to the Board Secretary no later than the close of business 14 days j
j preceding the Board meeting . The Board Secretary shall include on the agenda all items submitted by l
1 Directors , the General Manager and General Counsel and all formal communications. 1
: : I General Manager Blake Anderson (714) 593-7110 banderson@ocsd .com I
l Board Secretary Penny Kyle (714) 593-7130 pkyle@ocsd .com 1
1Director/Engineering David Ludwin (714) 593-7300 dludwin @ocsd .com 1
j Director/Financeffreasurer Gary Streed (714) 593-7550 gstreed@ocsd .com j
!Dire cto r/Human Resources Lisa Tom ko (714) 593-7145 ltom ko@ocsd .com i
1Director/lnformation Technology Patrick Miles (714) 593-7280 pmiles@ocsd.com l
j Director/Operations & l
i Maintenance Bob Ooten (714) 593-7020 rooten@ocsd .com 1
l Directorffechnical Services Bob Ghirelli (714) 593-7400 rqhirelli@ocsd .com l
j Director/Communications & l
l Adm inistrative Services Carol Beek man (714) 593-7120 cbeekman@ocsd .com 1
t.~.~D.~E.'!!! .. ~!?.!:l.~.~-~.1 .............................................. T..~E!.~!':l.~ .. ~: .. ~!?.!?.9.r.!:1.ff. ................ (!..1.~t.?..~~::? .. ?.9.? ....... ~!~@.~~.§d.a'o/·92.T ........................................... J
H:\dept\agenda\Board Agendas\2004 Board Agendas\092204 agenda.doc
Orange County Sanitation District
MINUTES
BOARD MEETING
SEPTEMBER 22, 2004
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
Minutes for Board Meeting
Page2
09/22/04
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was
held on September 22, 2004, at 7:00 p.m., in the District's Administrative Offices. Following the
Pledge of Allegiance and invocation the roll was called and the Secretary reported a quorum
present as follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
x Steve Anderson, Chair Steve Simonian
x James M. Ferryman, Vice Chair Arlene Schafer
A Don Bankhead Leland Wilson
Patricia Bortle x Rich Freschi
x Carolyn Cavecche Steve Ambriz
x Alberta Christy Mike Garcia
x John Collins Larry Crandall
x Bill Dalton Bruce Broadwater
A Brian Donahue David Shawver
x Michael Duvall Keri Lynn Wilson
x Norman Z. Eckenrode Judy Dickinson
x Cathy Green Gil Coerper
x Alice B. Jempsa Marilynn M. Poe
x Tony Kawashima Doug Davert
x Beth Krom Christina Shea
x Patsy Marshall Jim Dow
x Shirley McCracken Bob Hernandez
x Darryl Miller Peer A. Swan
x Roy Moore John Beauman
x Joy Neugebauer Grace Epperson
x Anna L. Piercy Tim Keenan
x Tod Ridgeway Don Webb
x Jim Silva Chuck Smith
A Paul Walker Larry Herman
x Paul Yost Charles Antos
STAFF MEMBERS PRESENT: Bob Ghirelli, Acting General Manager; Penny Kyle, Board
Secretary; Carol Beekman; Patrick Miles; Bob Ooten; Gary Streed; Lisa Tomko; Jim Herberg;
Sonja Wassgren; Fred O'Brien; Mike Moore; Simon Watson
OTHERS PRESENT: Brad Hogin, Assistant General Counsel; Doug Davert; Phil Luebben; Eric
Saperstein; John Freshman; Scott Baugh; Chris Townsend; Art Perry
Minutes for Board Meeting
Page 3
09/22/04
PUBLIC COMMENTS
There were none.
REPORT OF THE CHAIR
Chair Steve Anderson announced that the Advanced Water Purification Facility groundbreaking
ceremony held on September 20th attracted more than 150 elected officials, community leaders
and industry leaders from around the state and country. The dedication plaque and a rendering
of what the finished facility will look like were on display in the board room. ·
It was then noted that the meeting would be adjourned that evening in memory of Harvey Hunt
of Carollo Engineers. It was noted that Mr. Hunt was the lead designer and project manager
during the mid to late 1960's when Carollo Engineers was engaged to design the 120-inch
outfall. He oversaw the design of most of the original plants and was involved in the District's
initial master plans.
Chair Anderson then recognized the District's lobbying team who represent the District in
Sacramento and Washington, DC: Christopher Townsend, Townsend Public Affairs, Inc.; Scott
Baugh, Mayer Brown, Rowe & Maw; Eric Saperstein, ENS Resources; and John Freshman,
Freshman & Kast. Each team provided updates on their legislative activities and strategies.
REPORT OF THE GENERAL MANAGER
Acting General Manager, Bob Ghirelli, reported that Blake Anderson should be returning to work
by the end of October.
Fred O'Brien was recognized for 30 years of service to the District. It was also reported he
would become the skipper of the District's vessel, "Nerissa", which was recently launched.
Mr. Ghirelli also reported that the Santa Ana Regional Water Quality Control Board has
approved the District's NPDES permit. The EPA will begin their review and it should become
effective 30 days after the review. This will then complete the permitting process for secondary
treatment.
A brief update on the sewage spill over the Labor Day Weekend was then given. Staff is
continuing its investigation and has noted 25 corrective measures that need to be fixed. A full
report would be provided to the Directors in the near future.
REPORT OF THE GENERAL COUNSEL
Acting General Counsel Brad Hogin had no report.
Minutes for Board Meeting
Page4
09/22/04
APPROVAL OF MINUTES
The Chair ordered that the minutes of the regular meeting held August 25, 2004, be deemed
approved, as written.
Director Richard Freschi abstained.
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and "811
, attached hereto and made a part of these minutes. ·
ALL DISTRICTS 08/1-5/04 08/31/04
Totals $9,672,923.74 $12,593, 187.18
Director Cavecche abstained from discussion and voting on Warrant Nos. 64249 and 64444.
Director Green abstained from discussion and voting on Warrant No. 64695. Director Dalton
abstained from discussion and voting on Warrant Nos. 64277, 64194 and 64650. Director
Eckenrode abstained. Abstentions were pursuant to California Government Code Section
84308.
9. a.
CONSENT CALENDAR
MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. OCSD
04-24, Adoption of District's 2004 Conflict of Interest Code, and Repealing
Resolution No. OCSD 02-21.
b. MOVED, SECONDED AND DULY CARRIED: Approve an encroachment permit
over an existing sewer and easement with Tustin Gateway Plaza, LLC, in
connection with Contract No. 7-2R, in a form approved by General Counsel.
c. MOVED, SECONDED AND DULY CARRIED: Approve an Outside of Service
Area Sewer Service and Connection Agreement for the Haynes Power
Generation Facility with the City of Long Beach and the City of Los Angeles
Department of Water and Power, in a form approved by General Counsel.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. DRAFT STEERING COMMITTEE: A verbal report was presented by Director Anderson,
Chair of the Steering Committee, re the September 22, 2004 meeting.
Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order the Steering Committee Minutes
for the meeting held on August 25, 2004 to be filed.
Non-Consent Calendar
No items considered.
Minutes for Board Meeting
Page 5
09/22/04
12. OPERATIONS. MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
OMTS Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Operations,
Maintenance and Technical Services Committee Minutes for the meeting held on
September 1, 2004 to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 3 to
Agreement No. AKB-00-015 with the Santa Ana Watershed Project Authority
(SAWPA), Inland Empire Utilities Agency of San Bernardino County (IEUA),
Western Municipal Water District of Riverside County (WMWD), and the Milk
Producers Council (MPC) for a pilot program to sewer dairy washwater to the
Santa Ana Regional Interceptor (SARI) providing for changes in responsibilities
for the project.
c. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 1 to
Purchase Order No. 101758-08 for Purchase of Cationic Polymer, Specification
No. C-2003-143, issued to Polydyne Inc., for the purchase of a substitute cationic
polymer for part of the present contract with a unit rate increase of $0.23,
increasing the total price to $1.28 per pound and increasing the contract amount
from $1,076, 700 by $375,000 for an estimated amount of $1,451, 700 for the
period ending June 30, 2005.
OMTS Non-Consent Calendar
No items considered.
13. PLANNING. DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Planning, Design and
Construction Committee Minutes for the meeting held on September 2, 2004 to
be filed.
b. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 2 for
Facilities Modification for Odor Control II, Job No. J-71-3, with J.F. Shea
Construction, Inc., authorizing an addition of $183,375, and 30 calendar days,
increasing the total contract amount to $2, 107, 797.
c. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 8 for
Area Classification Study Implementation Plan, Plant Nos. 1 and 2, Job No. J-35-
2, with J.F. Shea Construction, Inc., authorizing an addition of $166,328,
increasing the total contract amount to $15,449,449.
d. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 3 to
Effluent Pump Station Annex, Job No. J-77, with J.F. Shea Construction, Inc.,
authorizing an addition of $333,388, increasing the total contract amount to
$43,286, 7 48.
Minutes for Board Meeting
Page6
09/22/04
e. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No. 2 to
Bayside Drive Trunk Sewer Manholes, Contract No. 5-22-R1, with Paulus
Engineering, Inc., authorizing an addition of $60,677.27, increasing the total
contract amount to $367, 153.22; and,
(2) Accept Contract No. 5-22-R1 as complete, authorizing execution of the Notice
of Completion and approving the Final Closeout Agreement.
f. MOVED, SECONDED AND DULY CARRIED: (1) Ratify Change Order No. 1 to
Circular Clarifier Drive Replacement Units D through Q, Job No. P2-85, Circular
Clarifier Sludge Blanket Indicators Units D through Q, Job No. SP-73, with J. F.
Shea Construction, Inc., authorizing an additional $60,535, increasing the total
contract amount to $1,545, 77 4; and,
(2) Accept Circular Clarifier Drive Replacement Units D through Q, Job
No. P2-85, and Circular Clarifier Sludge Blanket Indicators Units D Through Q,
Job No. SP-73, as complete, authorizing the Final Closeout Agreement.
g. MOVED, SECONDED AND DULY CARRIED: Ratify Change Order No. 9 to
Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, with Steve P. Rados, Inc.,
authorizing an addition of $153, 119, increasing the total contract amount to
$31,669,445.
h. MOVED, SECONDED AND DULY CARRIED: Approve Professional Services
Agreement with Brown and Caldwell for engineering services for Digester
Rehabilitation at Plant No. 2, Job No. P2-91, for an amount not to exceed
$2,677 ,550.
i. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 3 to the
Professional Services Agreement with Water 3 Engineering, Inc. for Peak Flow
Management, Job No. J-67, providing for additional engineering design services
for an additional amount of $35,226, increasing the total amount not to exceed
$1, 138,998.
j. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 4 to the
Professional Services Agreement with Fluor Enterprises, Inc., for the Space
Allocation and Interior Renovation, Job No. J-84, providing for engineering
services for an additional amount of $82,321, increasing the total amount not to
exceed $1,531, 171.
k. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No.1 to the
Service Contract with NRG Thermal Services LLC providing for additional field
services for Air Quality Improvements, Job No. J-79, for an additional amount of
$677,763, increasing the total amount not to exceed $2,247,954.
I. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 3 to the
Professional Services Agreement with Malcolm Pirnie, providing for additional
engineering services for Air Quality Improvements, Job No. J-79, for an
Minutes for Board Meeting
Page 7
09/22/04
additional amount of $521,707, increasing the total amount not to exceed
$1,830,547.
m. MOVED, SECONDED AND DULY CARRIED: (1) Approve Amendment No. 3 to
the Professional Services Agreement with Lee & Ro, Inc. for Replacement of the
Bitter Point Pump Station, Contract No. 5-49; Replacement of the Rocky Point
Pump Station, Contract No. 5-50; Rehabilitation of the 14th Street Pump Station,
Contract No. 5-51; and Rehabilitation of the "A" Street Pump Station, Contract
No. 5-52, providing for additional design engineering services, for an additional
amount of $818,093, increasing the total amount not to exceed $2,910, 188.
n. MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 1 to the
Professional Services Agreement with Camp, Dresser, & McKee for
Rehabilitation of Odor Control Facilities, Job No. J-71-8, providing for
modifications to the Scope of Work for an additional amount of $377,685,
increasing the total amount not to exceed $3,575,207.
o. MOVED, SECONDED AND DULY CARRIED: Receive and file Study Summary
and Recommendations and Field Testing Data Report, dated September 2004,
prepared by CH2M Hill, Inc. for the Effluent Pathogen Reduction Alternative Plan
Study, Job No. J-40-6.
p. MOVED, SECONDED AND DULY CARRIED: (1~ Approve a budget increase for
an additional $2,078,000 for Rehabilitation of 14• Street Pump Station, Contract
No. 5-51, for a total budget of $8,500,000;
(2) Approve an additional $2,019,000 for Rehabilitation of A" Street Pump
Station, Contract No. 5-52, for a total budget of $8,628,000;
(3) Approve plans and specifications for Rehabilitation of the 14th Street Pump
Station, Contract No. 5-51, and Rehabilitation of the "A" Street Pump Station,
Contract No. 5-52, on file at the office of the Board Secretary;
(4) Approve Addendum Nos. 1and2 to the plans and specifications;
(5) Receive and file bid tabulation and recommendation; and
(6) Award a construction contract to Kiewit Pacific Co. for Rehabilitation of the
14th Street Pump Station, Contract No. 5-51, and Rehabilitation of the "A" Street
Pump Station, Contract No. 5-52, for an amount not to exceed $11,697,780.
PDC Non-Consent Calendar
No items considered.
Minutes for Board Meeting
Page 8
09/22/04
14. FINANCE. ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHR)
FAHR Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Finance,
Administration and Human Resources Committee Minutes for the meeting held
on September 8, 2004 to be filed.
b. MOVED, SECONDED AND DULY CARRIED: Receive and file Treasurer's
Report for the month of June 2004.
c. MOVED, SECONDED AND DULY CARRIED: Receive and file Quarterly
Investment Management Program Report for the period April 1, 2004 through
June 30, 2004.
d. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. OCSD 04-
25, Amending Resolution No. OCSD 98-33, Amending Human Resources
Policies and Procedures Manual.
e. MOVED, SECONDED AND DULY CARRIED: Approve Change Order No. 1 to
Purchase Order No. 43620 issued to Moss, Levy & Hartzheim as the District's
internal auditor for fiscal year 2004/05, for an amount not to exceed $19,260.
f. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. OCSD 04-
26, Establishing A Grant Funding Program Policy and Code of Ethics in Support
of Meeting the Contractual Requirements of Awarding Agencies for Monetary
Assistance Granted to the District.
FAHR Non-Consent Calendar
No items considered.
15. GWR SYSTEM STEERING COMMITTEE (GWRSSCl
GWRSSC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Cooperative Committee Minutes for the meeting held on
August 9, 2004 to be filed.
GWRSSC Non-Consent Calendar
No items considered.
Minutes for Board Meeting
Page9
09/22/04
NON-CONSENT CALENDAR
16~ CONVENE IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS
54956.9 AND 54956.8: The Board convened in closed session at 8:00 p.m. pursuant to
Government Code Sections 56956.9 and 54956.8. Confidential minutes of the Closed
Session held by the Board of Directors have been prepared in accordance with
California Government Code Section 54957.2 and are maintained by the Board
Secretary in the Official Book of Confidential Minutes of Board and Committee Closed
Meetings. A report of action taken will be publicly reported at the time the approved
action becomes final re Agenda Item 16(a)(3). No reportable action was taken re
Agenda Item Nos. 16(a)(1) and (4 ). The Board did not consider Agenda Item
No. 16(a)(2), and no report was given.
RECONVENE IN REGULAR SESSION: At 8:15 p.m., the Board reconvened in regular
session.
ADJOURNMENT: The Chair declared the meeting adjourned in the memory of Harvey Hunt at
8:15 p.m.
H:\dept\agenda\Board Minutes\2004 Board Minutes\092204 minutes.doc
Warrant No. Vendor
Accounts Payable • Warrants
64077
64078
64079
64080
64081
64082
64083
64084
64085
64086
64087
64088
64089
64090
64091
64092
64093
64094
64095
64096
64097
64098
64099
64100
64101
64102
64103
64104
64105
64106
64107
64108
64109
64110
64111
64112
64113
64114
64115
64116
64117
64118
64119
64120
64121
64122
Orange County Water District
Southern California Edison
U.S. Peroxide, L.L.C.
Waste Markets Corp.
Airgas Safety, Inc.
American Telephone & Telegraph Corp.
Court Order
Consolidated Elect. Distributors, Inc.
Consumers Pipe & Supply Co.
County of Orange -Auditor Controller
County of Orange -Auditor Controller
Court Trustee
Department of Child Support Services
Dharma Consulting
Document Control Solutions, Inc.
Electra-Bond, Inc.
Electrical Reliability Services, Inc.
Employee Benefits Specialists, Inc.
Environmental Resource Association
Court Order
Fountain Valley Paints, Inc.
Franchise Tax Board
Fry's Electronics
Garland Manufacturing Co.
Garratt-Callahan Company
Grainger, Inc.
Graybar Electric Company
City of Huntington Beach
Industrial Hearing & Pulmonary Mgmt.
Internal Revenue Service
Internal Revenue Service
Intl. Union of Oper. Eng. AFL-CIO local 501
Irvine Ranch Water District
J & B Auto Parts
J.G. Tucker and Son, Inc.
Jamison Engineering Contractors, Inc.
Johnstone Supply
Lexis Nexis Matthew Bender
liquid Handling Systems
Los Angeles Times
McMaster-Carr Supply Co.
Midway Mfg & Machining Co.
Mine Safety Appliances Company
National Bond & Trust
OCEA
Court Order
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPnClaims Paid Report -081504.xls
finl210nc
Claims Paid From 08/01/04 to 08/15/04
$
Amount
65,064.63
73,255.89
43,527.61
33,918.14
214.05
76.68
150.00
870.89
224.02
182.14
105.00
69.12
188.50
15,725.00
1,675.44
4,466.96
2,744.21
9,688.15
1,091.71
445.00
147.35
50.00
409.39
455.60
1,864.19
610.43
4,978.05
17,471.39
321.00
200.00
300.00
3,911.04
4.73
142.10
1,820.16
3,250.28
236.28
132.32
1,904.86
197.52
378.39
959.88
85.00
2,439.20
598.98
40.00
Description
GAP Water
Power
Odor & Corrosion Control Treatment for Coll. Sys.; Hydrogen Peroxide & Ferrous Chloride
Maint. Agreement -Grit & Screenings Removal & Digester Bed Mat'I. Removal
Safety Supplies
Telephone Service
Wage Garnishment
Electrical Supplies
Plumbing Supplies
Wage Garnishment
Encroachment Permit
Wage Garnishment
Wage Garnishment
Professional Services -Strategic Planning & EMT Development
Software Maintenance
Fusion Bond Johnston Pump Parts
Electrical Testing-Transformers
Reimbursed Prepaid Employee Medical & Dependent Care
Lab Supplies
Wage Garnishment
Paint Supplies
Wage Garnishment
Computer Supplies
Mechanical Parts & Supplies
Chemicals
Compressor
Upgrade (6) Modicon Ethernet Communication Modules
Water Use
Employee Medical Surveillance Services
Wage Garnishment
Wage Garnishment
Dues Deduction
Water Use
Auto Parts & Supplies
Traffic Safety Equipment -Road Cones
Repair 12" Pipeline in Newport Beach
Electrical Supplies
Books & Publications
Motors
Publication
Mechanical & Electrical Parts & Supplies
Pump Supplies
Membership
U.S. Savings Bonds Payroll Deductions
Dues Deduction
Wage Garnishment
Page 1of8
EXHIBIT A
9/1/2004
. .
Warrant No. Vendor
64123 Parts Unlimited
64124 Court Order
64125 Peace Officers Council of CA
64126 Pen Valve
64127 Rockwell Engineering & Equipment Co.
64128 Saybolt, LP.
64129 Schwing America, Inc.
64130 Science Applications Intl., Corp.
64131 Shureluck Sales & Engineering
64132 Court Order
64133 Snap-On Tools, Inc.
64134 Standard & Poor's
64135 Stanford Center for Professional Dev.
64136 Summit Steel
64137 Technical Service Group, Inc.
64138 SBC
64139 Thompson Industrial Supply, Inc.
64140 Times Community News
64141 United Way
64142 Verizon California
64143 WEF
64144 Court Order
64145 Orange County Sanitation District
64146 U.S. Peroxide, L.L.C.
64147 McMaster-Carr Supply Co.
64148 Air Products & Chemicals
64149 Black & Veatch Corporation
64150 Blue Cross of California
64151 Brown & Caldwell
64152 Business Machines Consultants, Inc.
64153 Coral Energy Resources, LP.
64154 Environmental Science Associate {ESA)
64155 Godwin Pumps of America, Inc.
64156 HOR Engineering, Inc.
64157 IPMC c/o Parsons
64158 Jamison Engineering Contractors, Inc.
64159 Johnson Ukropina
64160 Kaiser Foundation Health Plan
64161 Kemiron Companies, Inc.
64162 lifecom-Safety, Inc.
64163 Mellon Trust
64164 National Plant Services, Inc.
64165 Orange County Business Council
64166 Orange County Water District
64167 Pioneer Americas, Inc.
64168 RD Instruments
64169 Sea-Bird Electronics, Inc.
H:\dept\ftn\210\CRANE\FAHR\FAHR2004\SEP1\Claims Paid Report· 081504.xls
ftn/210/lc
Claims Paid From 08/01/04 to 08/15/04
Amount
42.56
296.00
1,584.00
438.88
10,423.34
720.00
9.38
2,464.63
1,336.06
721.50
386.58
5,000.00
3,590.00
2,644.56
1,381.60
58.97
906.24
50.00
245.00
821.25
177.00
597.50
2,001.24
79,695.63
1,317.86
26,294.06
542,467.50
331,986.93
106,794.62
125,354.11
152,863.24
43,415.24
38,520.63
912,903.27
1, 187 ,063.00
72,937.69
150,000.00
59,110.90
174,775.23
82,844.67
27,816.76
26,995.00
50,000.00
64,625.53
380,993.12
27,895.00
37,940.00
Description
Truck Supplies
Wage Garnishment
Dues Deduction
Plumbing Parts & Supplies
Chopper Pump
Lab Analyses
Pump Supplies
Professional Services J-85
Cubicle Identification Holders
Wage Garnishment
Mechanical & Electrical Parts & Supplies
Analytical Services -Series 2000 COP Surveillance Fee 7-1/04 to 6/30/05
Training Registration
Metal
SCADA System VAX Service Agreement
Telephone Services
Mechanical Supplies
Notices & Ads
Employee Contributions
Telephone Services
Membership -Water Environment Federation
Wage Garnishment
Petty Cash Reimb.
Odor & Corrosion Control Treatment for Coll. Sys.; Hydrogen Peroxide & Ferrous Chloride
Mechanical Parts & Supplies
O & M Agreement Oxy Gen Sys MO 8-8-89
Engineering Services 5-58, J-71-3, J-87 & P1-102
Medical Insurance Premium
Professional Services P1-37 & P1-98
(14) Multifunctional Copiers, (6) Stapler/Stackers & Accessories
Natural Gas
Professional Services J-40-1 O
(1) Trailer-Mounted 8" Diesel Self-Priming Pump
Professional Services P1-82, J-40-1 & P2-82
Professional Services -Integrated Program Management
Construction Repairs -Various Jobs & Locations
Professional Services -FOG Outreach Program
Medical Insurance Premium
Ferric Chloride MO 9-27-95
Safety Supplies
Investment Custodian Bank
Vacuum Truck Services
Membership
GAP Water Use
Sodium Hypochlorite
Instruments
Lab Instruments, Parts, Repair & Calibration Services
Page 2 of 8
EXHIBIT A
9/1/2004
Warrant No.
64170
64171
64172
64173
64174
64175
64176
64177
64178
64179
64180
64181
64182
64183
64184
64185
64186
64187
64188
64189
64190
64191
64192
64193
64194
64195
64196
64197
64198
64199
64200
64201
64202
64203
64204
64205
64206
64207
64208
64209
64210
64211
64212
64213
64214
64215
64216
Vendor
Sun Engineering Services, Inc.
SPEC Services, Inc.
Tule Ranch/Magan Farms
U.S. Peroxide, L.L.C.
Ark Construction Company, Inc.
Dalke & Sons Constructions, Inc.
Mike Prlich & Sons
Steve P Rados, Inc.
Union Bank of California
Abatix Environmental Corp.
Ablaze Group, Inc.
AccuStandard, Inc.
Advance Business Graphics
Agilent Technologies, Inc.
Airco Filter Service
Airgas Safety, Inc.
Allied Packing & Rubber, Inc.
Alta-Robbins, Inc.
American Fildelity Assurance Company
American Training Resources, Inc.
Aquatic Bioassay And Consulting Labs, Inc.
Argos Technologies, Inc.
Piers Clark -Atkins Water
Awards & Trophies Company
AKM Consulting Engineers
ASCO Services, Inc.
ASMS Conference
American Telephone & Telegraph Corp.
American Telephone & Telegraph Corp.
Baker Tanks
Basic Chemical Solutions, L.L.C.
Battery Specialties
BioMerieux Vitek, Inc.
Boyle Engineering Corporation
Bush & Associates, Inc.
California Municipal Statistics, Inc.
California Relocation Services, Inc.
Caltrol, Inc.
Martin Boyer Co., Inc., c/o Cambridge
Carollo Engineers
Casual Gourmet
Chlorinators & Controls, Inc.
Coast Fire Equipment
Coast Rubber Stamp Mfg.
Cole-Parmer Instrument Co.
Compressor Components of California
Consolidated Elect. Distributors, Inc.
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPT\Claims Paid Report· 081504.xls
fin/21Dnc
Claims Paid From 08/01/04 to 08/15/04
Amount
28,410.00
40,445.99
247,141.70
110,698.65
40,434.68
52,240.50
172,366.42
432,774.90
48,086.10
441.78
4,048.70
205.61
84.00
1,757.56
686.71
608.85
1,653.22
336.84
38.50
1,076.62
100.00
239.82
2,000.00
26.27
7,980.21
4,745.77
970.00
839.36
47.13
4,452.00
23,537.60
170.68
1,079.00
21,362.53
988.00
475.00
112.50
1, 178.32
15, 125.00
1,871.50
252.57
1,496.27
594.78
277.84
1,417.98
8,956.44
2,142.56
Description
Professional Services -Indoor/Outdoor Lighting Study
Engineering Services J-33-1
Residuals Removal MO 3-29-95
Odor & Corrosion Control Treatment for Coll. Sys.; Hydrogen Peroxide & Ferrous Chloride
Construction P1-62
Construction J-89
Construction 6-13-3
Construction 1-2-4
Construction 1-2-4, Retention
Hardware
Software Consulting Services -Seagate & Crystal Enterprise Installations
Lab Supplies
Business Cards
Lab Parts & Supplies
Filters
Safety Supplies
Pump Packing Supplies
Instrument Supplies
Employee Cancer Insurance
Safety Video
Toxicity Testing
Lab Parts & Supplies
Anaerobic Baffled Reactor (ABR) Testing
Plaques & Awards
Professional Services 7-36, 7-39, 7-41 -Trunk Sewer Improvements
Electrical Switch Repair
Lab Administration/Quality Assurance Meeting Registration
Telephone Conference Services
Telephone Service
Tank Rentals
Sodium Bisulfite & Sodium Hydroxide
Batteries
Lab Supplies
Professional Services 1-2-4 & 7-23-1
Professional Services 6-13-3 & 7-23-1
Statement of Overlapping Tax & Assessment Debt -For Use In June 30, 2004, CAFR
Office Files Moving/Relocation Services
Instrument Parts & Supplies
Prof. Services -Workers' Compensation Claims
Professional Services -Coordinated Commercial Enterprise Study
Meeting Expenses J-88
Instrument Parts & Supplies
Fire Extinguishers
Office Supplies
Instrument Parts & Supplies
Compressor Repair & Maintenance Services
Electrical Supplies
Page 3 of 8
EXHIBIT A
9/112004
Warrant No.
64217
64218
64219
64220
64221
64222
64223
64224
64225
64226
64227
64228
64229
64230
64231
64232
64233
64234
64235
64236
64237
64238
64239
64240
64241
64242
64243
64244
64245
64246
64247
64248
64249
64250
64251
64252
64253
64254
64255
64256
64257
64258
64259
64260
64261
64262
64263
Vendor
Consumers Pipe & Supply Co.
Cooper Cameron Corporation
Corporate Express
Corporate Image Maintenance, Inc.
Counterpart Enterprises, Inc.
County of Orange -Auditor Controller
Crane Veyor Corp.
CALPELRA
CR&R, Inc.
Voided Check
CWEA Specialty Conference
Del Mar Analytical
Duke's Root Control, Inc.
Dunn-Edwards Corporation
Dwyer Instruments, Inc.
Enchanter, Inc.
Environmental Resource Association
Excel Door & Gate Company, Inc.
ENS Resources, Inc.
FedEx Corporation
Fine Science Tools, Inc.
First American Real Estate Solutions
Fisher Scientific Company, L.L.C.
Five Star Metals, Inc.
Fleet Research, Inc.
Flo -Systems, Inc.
Fluid Dynamics
Foodcraft Coffee & Refreshment Services
Forensic Analytical
Fortis Benefits Insurance Company
Franklin Covey
G. E. Supply
Ganahl Lumber Company
Garig Equipment & Maintenance
Garratt-Callahan Company
General Petroleum
Gierlich-Mitchell, Inc.
Gold Coast Awards, Inc.
Goldenwest Window Service
Government Finance Officers Association
Grainger, Inc.
Haaker Equipment Company
Harold Primrose Ice
Harrington Industrial Plastics, Inc.
Hatch & Kirk, Inc.
Hill Brothers
History Associates, Inc.
H:\depl\fin\210\CRANE\FAHR\FAHR2004\SEPnClaims Paid Report· 081504.xls
fin1210Jlc
Claims Paid From 08101104 to 08115/04
Amount
59.79
547.51
4,725.01
160.00
8,158.22
690.00
2,320.00
2,089.00
315.00
210.00
788.00
10,031.31
459.24
360.85
2,700.00
1,593.77
695.60
15,041.91
289.76
143.65
1,024.50
19,489.08
681.80
335.00
161.63
105.79
694.69
220.00
24,760.78
95.88
3,513.90
3,004.61
3,547.18
8, 163.36
1,417.74
133.99
242.01
3, 122.00
55.00
3,285.68
2,612.28
74.00
1,722.56
2,258.75
6,376.94
7,307.60
Description
Plumbing Supplies
Engine Supplies
Office Supplies
Custodial Services Spec. No. 9899-09
Mechanical Parts & Supplies
June 16, 2004 Sewage Spill Response & Bacteriological Water Samples
Quarterly Crane Inspections & Annual Certifications & Testing
Training Registration
Container Rentals
Membership
Analysis of Biosolids and Wastewater
8" Sewer Root Control Service
Paint Supplies
Instrument Parts & Supplies
Ocean Monitoring & Outfall Inspection & Maintenance
Lab Supplies
Repair & Maintenance Service -Bushard Gate
Professional Services -Legislative Advocate
Freight Services
Lab Parts & Supplies
On-Line Orange County Property Information
Lab Parts & Supplies
Mechanical Parts & Supplies
Publication
Pump Supplies
Freight Charges
Meeting Supplies
Asbestos Analyses & Microscopy
Long-Term & Short-Term Disability Ins. Premium
Office Supplies
Electrical Parts & Supplies
Lumber/Hardware
Hydraulic Pump & Parts
Chemicals
Lubricants
Mechanical Parts & Supplies
Plaques & Name Badges
Window Cleaning Service -Spec. #990015
Subscription
Motor Base Mounting
Misc. Vehicle, Parts, Repairs & Service
Ice For Samples
Mechanical & Plumbing Parts & Supplies
Engine Generator Control Supplies
Chemicals -Odor & Corrosion Control -Newport Trunkline
Professional Services -Study of Records, Photographic Material & Reports
Page4 of8
EXHIBIT A
9/112004
Warrant No.
64264
64265
64266
64267
64268
64269
64270
64271
64272
64273
64274
64275
64276
64277
64278
64279
64280
64281
64282
64283
64284
64285
64286
64287
64288
64289
64290
64291
64292
64293
64294
64295
64296
64297
64298
64299
64300
64301
64302
64303
64304
64305
64306
64307
64308
64309
64310
Vendor
Home Depot
Hopkins Technical Products
Hub Auto Supply
Human Capital Institute, Inc.
Huntington Beach City School District
Industrial Distribution Group
Intelligence Press, Inc.
IBM Corporation
lntratek Computer, Inc.
Ionics Instrument Business Group
Iron Mountain
Iron Mountain Off-Site Data Protection
J. O'Brien Company, Inc.
Jay's Catering
Johnstone Supply
JWC Environmental
Konnie Kim Fine Art
labeltronix
landmark Education Corporation
lindell l. Marsh, Attorney at law
lucci's Gourmet Foods, Inc.
lECCOTECH
Mac & Associates, An Industrial Dist. Co.
Managed Health Network
Mayer, Brown, Rowe & Maw, l.L.P.
McKenna Engineering & Equipment Co., Inc.
McMaster-Carr Supply Co.
McRay Industries, Inc.
Measurement Control Systems, Inc.
Media Resurfacing Systems, Inc.
Medlin Controls Co.
Megger
Midway Mfg & Machining Co.
Mike Heinz & Associates
Mission Abrasive & Janitorial Supplies
Mission Uniform Service
Mitchell Instrument Co.
Morton Salt
Myron L. Company
MDS Consulting
National Filter Media Corporation
Neal Supply Co.
New Hermes, Inc.
New Horizons CLC of Santa Ana
Newark Electronics
Nextel Communications
Ninyo & Moore Corporate Accounting
H:\dept\fin\210\CRAN~AHR\FAHR2004\SEPnClaims Paid Report. 081504.xls
fin/210nc
Claims Paid From 08/01/04 to 08/15/04
Amount
1,086.92
1,035.72
705.01
995.00
173.00
2,979.09
1,375.00
5,186.43
2,160.00
783.43
86.06
272.50
422.42
1,933.51
352.01
2,984.47
60.34
3,530.00
395.00
5,000.00
918.75
3,232.50
1,270.64
950.94
5,000.00
124.54
824.83
1,372.23
5,290.53
2,800.00
670.54
1,335.00
21,334.50
1,100.00
41.59
6,505.05
310.00
1,412.85
512.40
5,053.27
16,263.39
259.84
188.48
160.00
1,706.00
1,399.09
8,917.77
Description
Misc. Repair & Maintenance Material
Pump Supplies
Vehicle Parts & Supplies
Training Registration
Permit -Sower Middle School Community Meeting Re Bushard Project
Mechanical Parts & Supplies
Publication
Maintenance Agreement AS-400
Network & Server Maintenance
Lab Parts & Supplies
Bid Document Storage Fees P1-37
Offsite Back-Up Tape Storage for NT Server
Security Badge Supplies
Meeting Expenses
Electrical Supplies
Repairs & Maint. Services -Muffin Monster Rebuild
Picture Framing Services
Service Agreement -Zebra Bar Code Printers
Training Registration
Environmental Consulting Services Re Protection of Santa Ana River Interceptor
Meeting Expense
Software Upgrade & Support
Valves
Employee Assistance Program
Professional Services -Strategic Planning & Advocacy
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Repair of Rotary Gas Meter
Mechanical Parts, Supplies & Repairs
Instrument Supplies
Troubleshooting, Repairs & Training Services on Pulsar Relay Calibrator
Mechanical Parts & Supplies
Prof. Services -Facilitator for Process Engineering Goal Development Team Meetings
Janitorial Supplies
Uniform Rentals
Instruments
Salt
Instrument Parts & Supplies
Prof. Services -Surveying Various Capital Projects
Press Belts
Plumbing Supplies
Identification/Engraving Materials
Training Registration
Electrical Parts & Supplies
Cellular Phones & Air Time
Professional Services -Materials Testing, Inspection & Geotechnical Engrg.
Page 5 of 8
EXHIBIT A
9/1/2004
Warrant No.
64311
64312
64313
64314
64315
64316
64317
64318
64319
64320
64321
64322
64323
64324
64325
64326
64327
64328
64329
64330
64331
64332
64333
64334
64335
64336
64337
64338
64339
64340
64341
64342
64343
64344
64345
64346
64347
64348
64349
64350
64351
64352
64353
64354
64355
64356
64357
Vendor
Nu-Way Laser Engraving
NAS Associates, Inc.
O C Tanner Recognition Company
0. C. Windustrial Co.
Office Depot Business Services Div.
Omega Industrial Supply, Inc.
Omron IDM Controls, Inc.
OneSource Distributors, Inc.
Optio Software, Inc.
Orange Fluid System Technologies, Inc.
Oxygen Service Company
OCB Reprographics
P.L. Hawn Company, Inc.
Pacific Bell Internet Services
Parker Supply Company
Parkhouse Tire Co.
Partners Consulting Services
Parts Unlimited
Pen Valve
Perkin Elmer Corporation
Pitney Bowes
Planet Associates
Polydyne, Inc.
Port Supply
Praxair Distribution, Inc.
Pre-Paid Legal Services, Inc.
Precision Wallcovering
Proactive Biomedical
Psomas
PCG Industries
PCS Express, Inc.
RF Partridge & Associates, Inc.
R W Beck, Inc.
R. Fox Construction, Inc.
R. L. Abbott & Associates
Reliastar
Retrofit Parts & Components, Inc.
Ricoh Business System
Roto Rooter
RM Automation c/o RM Controls
RMS Engineering & Design, Inc.
RMSAWWA -Rocky Mountain Section of the
Safety-Kleen
Safetycare, Inc.
Saybolt, LP.
Schneider Automation, Inc.
Scottel Voice & Data, Inc.
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPnClaims Paid Report -081504.xls
fin/210/lc
Cfalms Paid From 08101104 to 08/15/04
Amount
2,563.84
1,415.00
1,617.21
67.99
2,119.79
559.91
2,276.67
1,212.19
872.78
206.53
2,576.93
10,046.73
2,406.27
328.86
7,011.31
164.03
22,560.00
43.29
63.91
3,805.29
86.00
10,000.00
22,534.74
111.01
18.47
433.55
11,345.00
371.80
19,602.00
3,250.00
122.00
500.00
11,675.95
170.00
3,000.00
9,993.60
197.25
1,623.90
428.50
192.74
15,887.50
125.00
533.36
253.21
1,440.00
4,757.17
4,569.60
Description
Steel Tags
Lab Services
Employee Service Awards Program
Mechanical Parts & Supplies
Office Supplies
Janitorial Supplies
Instrument Parts & Supplies
Electrical Parts & Supplies
Software Maintenance Agreement
Lab Parts & Supplies
Specialty Gases
Printing Service-MO 1/26/00
Repair & Maint. Services -Remove & Refill Activated Carbon from Filter Panels
Internet Service
Mechanical Parts & Supplies
Tires
One World XE -Implementation of Project Mgmt. & Change Mgmt. Functions
Truck Supplies
Plumbing Parts & Supplies
Lab Parts & Supplies
Repair & Maint. Services -Letter Opener Machine
Software -Cable Asset Management
Cationic Polymer MO 3-11-92
Off-Shore Mooring Deployment Supplies
Demurrage
Employee Legal Service Insurance Premium
Wall Covering Services -J-42
Lab Parts & Supplies
Prof. Services -Enterprise Geographic Information System Strategic Plan
Repair & Maintenance Services
Courier Service
Repair & Maintenance Services
Professional Services P1-90
Construction -Cooling Water Drains for Vaporizer
Kern County Biosolids Consulting Services
Employee Basic Life Insurance & Additional Manager Coverage
Mechanical Parts & Supplies
Color Copier Lease
CCTV, Engineering Inspection & Unclogging Sewer Laterals
Instrument Supplies
Engineering Services -Facilities Engineering Program
Environmental Assessment Division Meeting Registration
Parts Washer Lease & Service
Training Video
Lab Analyses
Software Updates & Support
Telephone System Maintenance
Page 6of8
EXHIBIT A
91112004
Warrant No.
64358
64359
64360
64361
64362
64363
64364
64365
64366
64367
64368
64369
64370
64371
64372
64373
64374
64375
64376
64377
64378
64379
64380
64381
64382
64383
64384
64385
64386
64387
64388
64389
64390
64391
64392
64393
64394
64395
64396
64397
64398
64399
64400
64401
64402
64403
64404
Vendor
Sheshunoff
Shureluck Sales & Engineering
Sigma-Aldrich, Inc.
Skalar, Inc.
Smardan Supply Company
Smith Pipe & Supply, Inc.
So. Cal. Gas Company
Solar Biologicals, Inc.
South Coast Air Quality Management Dist.
Southern Counties Lubricants
Southwest Air Balance Corp.
Sparling Instruments, Inc.
Spectrum Video, Inc.
Spex Certiprep, Inc.
Starbuck Truck Refinishing, Inc.
Summit Steel
Sunset Ford
Sunset Industrial Parts
South Coast Environmental Co.
SCWMF
SPX Valves & Control
Tasco Pacific Fire Protection
The Walking Man, Inc.
Thermo Electron Corp.
Thermo Finnigan, L.L.C.
Thompson Industrial Supply, Inc.
ThyssenKrupp Elevator Corporation
Time Motion Tools
Time Warner Communication
Tony's Lock & Safe Service & Sales
Toshiba International Corporation
Townsend Public Affairs
Traffic Control Service, Inc.
Truck & Auto Supply, Inc.
Truesdail Laboratories, Inc.
Two Wheels One Planet
TMV Systems Engineering, Inc.
Ultra Scientific
Underground Service Alert of So. Calif.
United Parcel Service
Valeo Instruments Co., Inc.
Verizon California
Vision Service Plan-(CA)
VWR Scientific Products Corporation
The Wackenhut Corporation
Wally Machinery and Tool Supply, Inc.
Waxie Sanitary Supply
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPnClaims Paid Report -081504.xls
fin/210/lc
Claims Paid From 08/01/04 to 08/15/04
Amount
309.95
3,638.89
281.59
17.52
241.38
415.59
19,546.27
1,750.00
1,685.74
1,633.17
1,220.75
2,810.18
6,750.00
103.98
3,604.50
438.10
499.36
552.37
11,585.29
25.00
1, 181.02
505.20
525.00
1,724.96
23,037.50
1,827.53
1,280.00
686.41
40.47
181.85
303.04
5,000.00
439.08
163.74
1,350.00
260.76
3,875.00
740.87
1,377.60
1,075.24
60.10
1,067.55
9,490.92
6,717.95
6,686.15
238.13
337.05
Description
Subscription
Mechanical Parts & Supplies
lab Supplies
lab Supplies
Mechanical Parts & Supplies
Plumbing Supplies
Natural Gas
Lab Parts & Supplies
Annual Emission, Operation & Misc. Fees
Grease & Gear Oil
Professional Services -Airflow Testing In Pilot Test
Flow Meter
Professional Services J-84
Lab Supplies
Repair & Repaint Truck Service Bed -V-400
Metal
Auto Parts & Service
Mechanical Supplies
Cen Gen Emissions Testing Service
Membership (Southern California Waste Management)
Valves
Quarterly/Annual Inspection & Certifications of Fire Sprinkler Systems at Pits. 1 & 2
Public Notice Mailings -Various Projects
Electrical Parts & Supplies
Lab Instruments, Parts & Service
Mechanical Supplies
Elevator Maintenance
Tools
Cable Services
Locks & Keys
Electrical Supplies
Legislative & Executive Advocate for Grant Funding
Traffic Safety Equipment
Automotive Supplies
Lab Testing for AS Plant Stress Test
Bicycle
Software Support Services
Lab Supplies
Underground Utility Identification/Notification Service
Parcel Services
Lab Supplies
Telephone Services
Vision Service Premium
Lab Supplies
Security Guards
Mechanical Parts & Supplies
Janitorial Supplies
Page 7of8
EXHIBIT A
9/112004
Warrant No.
64405
64406
64407
64408
64409
64410
64411
64412
64413
64414
64415
64416
64417
64418
64419
64420
64421
64422
64423
64424
64425
64426
64427
64428
64429
Vendor
Weber Scientific
Wells Supply Company
West Coast Switchgear, Inc.
West-Lite Supply Company, Inc.
Wirth Gas Equipment Co.
Xerox Corporation
Yale/Chase Materials Handling, Inc.
Adams/Mallory Construction Co., Inc.
Emilio Ariston
Karen I. Baroldi
Thomas M. Blanda
Richard A. Castillon
Kevin Hadden
Wanda R. Hagerty
Deirdre E. Hunter
Jose R. Ibarra
Larry J. Jones
Ludolph T. Lorrimer
David A. Ludwin
Mark S. Roberts
Douglas M. Stewart
Edward M. Torres
County of Orange -Auditor Controller
Kienow Associates, Inc.
Orange County Sanitation District
Total Accounts Payable -Warrants
Payroll Disbursements
34502-34616 Employee Paychecks
34617 -34620 Employee Paycheck
100847 -101381 Direct Deposit Statements
Total Payroll Disbursements
Wire Transfer Payments
Chase Manhattan Bank
JP Morgan Chase Bank
JP Morgan Chase Bank
Chase Bank of Texas
Societe Generale
OCSD Payroll Taxes & Contributions
Total Wire Transfer Payments
Total Claims Paid 08/01/04-08/15/04
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPTIClaims Paid Report· 081504.xls
fin/210/lc
Claims Paid From 08/01/04 to 08/15/04
Amount
557.70
274.93
772.00
196.53
16,091.39
195.42
2,115.13
14,624.88
102.00
411.66
213.89
670.57
1,416.59
106.67
142.99
85.00
46.00
540.42
3,590.00
87.00
822.00
1,141.43
587.00
14,011.58
18, 181.05
$ 6,978,737.49
$ 144,420.82
15,745.34
1,001,895.91
$ 1, 162,062.07
$ 73,766.34
36,577.10
124,713.11
450,000.00
53,833.41
793,234.22
$ 1,532,124.18
$ 9,672,923.74
Description
Lab Supplies
Mechanical Parts & Supplies
Electrical Parts & Supplies
Electrical Supplies
Gas Meters & Transmitters
Fax & Copier Leases
Controllers
Construction P2-79-1
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Removal & Repair of (2) Underground Storage Tanks at Pit. 2
Legal Services 1-2-4
Worker's Comp. Reimb.
Biweekly Payroll 08/04/04
Voided, Reissued, Resignation & Retirement Payroll Checks
Biweekly Payroll 08/04/04
Commitment Fee for Series 2000 Refunding Certificates of Participation (5/1/04-7/31/04)
July Interest Payment on Series 1993 Certificates of Participation
Societe Generale July Swap Payment on 1993 Series Certificates of Participation
August Principal & Interest Payment on 1993 Series Ref. Certificates of Participation
Standby Letter of Credit Commission on Series 1993 Ref. Certificates of Participation
Biweekly Payroll 08/04/04
Page 8of8
EXHIBIT A
9/1/2004
. "
Warrant No. Vendor
~~~~~~~~~~~~~~~-
Accounts Payable -Warrants
64430
64431
64432
64433
64434
64435
64436
64437
64438
64439
64440
64441
64442
64443
64444
64445
64446
64447
64448
64449
64450
64451
64452
64453
64454
64455
64456
64457
64458
64459
64460
64461
64462
64463
64464
64465
64466
64467
64468
64469
64470
64471
64472
64473
64474
64475
American Express
Dell Computer
Orange County Water District
Pacific Investment Management Co.
UBS Financial Services, Inc.
Airgas Safety, Inc.
Alta-Robbins, Inc.
American Trainco, Inc.
American Telephone & Telegraph Corp.
Basler Electric Company
Bickmore Risk Services
SEC-Building Electronic Controls, Inc.
Caltrol, Inc.
Cambridge Isotope Labs
Cardlock Fuel Systems, Inc.
Court Order
Consolidated Elect. Distributors, Inc.
County of Orange
Court Trustee
CWEA Membership
Department of Child Support Services
Employee Benefits Specialists, Inc.
Employers Group
Court Order
FedEx Corporation
First American Real Estate Solutions
Fisher Scientific Company, L.L.C.
Franchise Tax Board
Fry's Electronics
FLIR Systems, Inc.
Home Depot
Industrial Metal Supply
Internal Revenue Service
Internal Revenue Service
Intl. Union of Oper. Eng. AFL-CIO Local 501
MarVac Electronics
McMaster-Carr Supply Co.
Midway Mfg & Machining Co.
Mission Uniform Service
National Bond & Trust
Orange County Council of Governments
Orange County Public Affairs Assoc.
Orange Fluid System Technologies, Inc.
OCEA
Pacific Mechanical Supply
Court Order
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPnClalms Paid Report -083104.xls
fin1210nc
Claims Paid From 08/16/04 to 08/31/04
$
Amount
29,468.22
46,524.56
1, 173,599.26
202,541.00
30,562.19
871.49
54.89
1,580.00
79.46
2,861.76
2,000.00
2,999.33
950.62
366.35
10,521.33
150.00
304.53
182.14
69.12
194.00
188.50
10,327.60
2,100.00
445.00
81.17
982.00
1,272.10
50.00
981.25
3,165.00
16.25
3,965.n
300.00
200.00
3,890.54
128.79
612.38
8,781.65
1,047.11
2,439.20
50.00
20.00
987.96
598.98
85.36
40.00
Description
Purchasing Card Program, Misc. Supplies & Services
(25) Desktop Computers and Monitors
Joint GWRS Project J-36
Investment Management Service Res. 95-97
Remarketing Fee-1992 Series Advanced Refunding COPs
Small Tools
Instrument Supplies
Training Registration
Telephone Service
Electrical Supplies
Professional Services -Actuarial Review for Workers' Compensation Program
Fire Alarm System Maintenance Program Quarterly Inspection
Electrical Parts & Supplies
Lab Parts & Supplies
Fueling District Vehicles at Local Gas Stations
Wage Garnishment
Electrical Supplies
Wage Garnishment
Wage Garnishment
Membership -Calif. Water Environment Assoc.
Wage Garnishment
Reimbursed Prepaid Employee Medical & Dependent Care
On-Site Training -Succession Planning
Wage Garnishment
Air Freight
On-Line Orange County Property Information
Lab Supplies
Wage Garnishment
Computer Supplies
Training Registration
Misc. Repair & Maintenance Material
Metal
Wage Garnishment
Wage Garnishment
Dues Deduction
Electrical Parts & Supplies
Mechanical & Electrical Parts & Supplies
Repair & Maintenance Services
Uniform Rentals
U.S. Savings Bonds Payroll Deductions
Communications Division Meeting Registration
Communications Division Meeting Registration
Mechanical Parts & Supplies
Dues Deduction
Plumbing Supplies
Wage Garnishment
Page 1of8
EXHIBITS
9/1312004
Warrant No.
64476
64477
64478
64479
64480
64481
64482
64483
64484
64485
64486
64487
64488
64489
64490
64491
64492
64493
64494
64495
64496
64497
64498
64499
64500
64501
64502
64503
64504
64505
64506
64507
64508
64509
64510
64511
64512
64513
64514
64515
64516
64517
64518
64519
64520
64521
64522
Vendor
Parker Hannifin Corporation
Partners Consulting Services
Court Order
Peace Officers Council of CA
Pen Valve
Sancon Engineering, Inc.
Smardan Supply Company
Suzanne A. Smith
Court Order
So. Cal. Gas Company
South Coast Air Quality Mgmt. Dist.
Southern California Edison
Southern California Edison
Southern Counties Lubricants
Southland Envelope Company, Inc.
Sunset Industrial Parts
Tetra Tech, Inc.
The Procurement Connection, Inc.
Thompson Industrial Supply, Inc.
Thompson Publishing Group
United Parcel Service
United Way
US Metering & Technology
Verizon California
Verne's Plumbing
WEF
Court Order
Emilio Ariston
UCI University Club, Inc.
ADS Environmental Services, Inc.
Basic Chemical Solutions, L.L.C.
Black & Veatch Corporation
Brown & Caldwell
Cameron Environmental, Inc.
Camp Dresser & McKee, Inc.
Coral Energy Resources, LP.
County of Orange -Auditor Controller
Environmental Science Associate (ESA)
Hill Brothers
Irvine Technology Corporation
Kemiron Companies, Inc.
Lee & Ro, Inc.
Malcolm Pirnie, Inc.
MWH Americas, Inc.
NRG Thermal Services, L.L.C.
Parsons Water & Infrastructure, Inc.
Petroleum Engineering, Inc.
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPTIC1alms Paid Report-083104.xls
fin/210nc
Claims Paid From 08/16/04 to 08/31/04
Amount
137.28
22,860.00
296.00
1,584.00
84.33
5,075.00
49.53
707.19
721.50
4,995.76
784.55
19,050.40
2,090.91
2,489.03
508.30
295.72
2,006.00
190.00
153.80
298.00
69.11
245.00
189.47
2,062.46
1,150.00
139.00
597.50
97.00
1,096.69
60,910.63
42,597.32
128,330.04
110,539.29
29,355.75
82,278.45
172,478.72
45,599.40
30,631.43
37,549.40
31,212.00
120,098.89
32, 197.90
264,344.76
121,733.64
39,699.00
60,754.79
158,391.20
Description
Mechanical Parts & Supplies
FIS Help Desk On-Site Support -One World XE Migration Project
Wage Garnishment
Dues Deduction
Plumbing Parts & Supplies
Construction -Pump Out (3) Air Jumper Lines
Plumbing Parts & Supplies
Meeting/Training Expense Reimbursement
Wage Garnishment
Natural Gas
Employee Commute Reduction Plan Triennial Program Fee
Power
Power
Engine Oil
Payroll Envelopes
Mechanical Parts & Supplies
Professional Services -Hydraulic Analysis
Training Registration
Mechanical Supplies
Publication
Parcel Services
Employee Contributions
Mechanical Parts & Supplies
Telephone Services
Laboratory Dishwasher Hook-Up
Membership -Water Environment Federation
Wage Garnishment
Meeting/Training Expense Reimbursement
Meeting Expenses -EMT Retreat
Professional Services -J-73-2
Sodium Bisulfite & Sodium Hydroxide
Engineering Services P2-85 & J-77
Engineering Services P1-37 & 2-41
Scrubber System Equipment Rental & Lease
Engineering Service J-71-8
Natural Gas
Attribute Processing Charges for 2004-05
Professional Services J-40-5
Chemicals -Odor & Corrosion Control -Newport Trunkline
Temporary Employment Services
Ferric Chloride MO 9-27-95
Engineering Services 5-49
Engineering Services P2-80 & J-79
Professional Services P2-74
Construction J-79
Professional Services J-35-2
Construction -Plant 2 UST Piping Replacement
Page 2of8
EXHIBITS
9/1312004
Warrant No.
64523
64524
64525
64526
64527
64528
64529
64530
64531
64532
64533
64534
64535
64536
64537
64538
64539
64540
64541
64542
64543
64544
64545
64546
64547
64548
64549
64550
64551
64552
64553
64554
64555
64556
64557
64558
64559
64560
64561
64562
64563
64564
64565
64566
64567
64568
64569
Vendor
Pioneer Americas, Inc.
Polydyne, Inc.
Southern California Edison
Synagro Technologies, Inc.
Tule Ranch/Magan Farms
U.S. Peroxide, L.L.C.
Western Solutions, Inc.
Woodruff, Spradlin & Smart
ARB, Inc.
J F Shea Construction, Inc.
J R Filanc Construction, Inc.
Margate Construction, Inc.
Morrow-Meadows Corp
Olsson Construction, Inc.
Southern Contracting Company
Torrey Pines Bank
Union Bank of California
Ablaze Group, Inc.
Able Scale Repair
Absolute Standards, Inc.
Advance Business Graphics
Advance Business Graphics
Agilent Technologies, Inc.
Air Cleaning Solutions
Filter Supply Company
Airgas -West
Airgas Safety, Inc.
Alfa-Laval, Inc.
Alhambra Foundry Co., Ltd.
American Machinery & Blade, Inc.
American Red Cross
Analysts, Inc.
Appleone Employment Service
Aquatic Bioassay And Consulting Labs, Inc.
Arch Wireless
Ashbrook Corporation
American Telephone & Telegraph Corp.
American Telephone & Telegraph Corp.
AWSI
AWWA
Baker Tanks
Battery Specialties
Belisle & Associates
Bently Nevada Corporation
Boyle Engineering Corporation
Brenntag Pacific, Inc.
Business Objects Americas
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPnClaims Paid Report-083104.xls
fin/210/lc
Clalms Paid From 08/16/04 to 08/31/04
Amount
205,751.52
117,280.61
142,823.73
257,713.02
236,432.94
110,303.71
66,527.00
219,850.17
1,347,796.17
1,518,722.34
1,468,208. 70
36,490.54
440,360.00
196,086.00
50,281.00
163,134.30
149,755.28
6,200.00
1,264.00
245.00
109.98
621.66
278.89
7,208.48
314.66
11.76
157.31
65.71
9,006.82
136.44
60.00
734.80
3,505.41
8,460.00
1,701.77
3,851.29
247.73
154.61
64.65
131.00
560.00
493.41
4,532.00
4,670.97
24,219.40
451.16
12,412.80
Description
Sodium Hypochlorite
Cationic Polymer MO 3-11-92
Power
Residuals Removal MO 3-29-95
Residuals Removal MO 3-29-95
Odor & Corrosion Control Treatment for Coll. Sys.: Hydrogen Peroxide & Ferrous Chloride
Lab Analyses of Benthic Infauna! for Permit Required for Core Ocean Monitoring Program
Legal Services MO 7-26-95
Construction 7-41 & 7-39
Construction J-71-3, J-35-2 & J-77
Construction P1-76
Construction J-67
Construction P2-47-3, OAF Power Reliability Upgrades
Construction P2-82
Construction J-33-1A
Construction P1-76
Construction 7-41, Retention
On-Site Crystal Training
Loading Scales Quarterly Inspection & Certification
Lab Parts & Supplies
Business Cards
Printing -Blank Business Card Stock w/District Logo
Lab Parts & Supplies
Safety Supplies
Filters
Demurrage
Safety Supplies
Mechanical Parts & Supplies
Manhole Frames & Covers
Mechanical Parts & Supplies
CPR Training & Miscellaneous Supplies
Sea Oil Analysis & Testing Kits
Temporary Employment Services
Ammonia Testing/Menidia Testing
Paging Service, Airtime, & Equipment
Mechanical Parts & Supplies
Telephone Conference Services
Telephone Service
Department of Transportation Training Program
Membership (American Water Works Association)
Tank Rentals
Batteries
On-Site Training -Business Writing
Calibration of Vibration Monitors
Prof. Servs. -Update Sewer Master Plans for Lemon & Cowan Hts. & Orange Park Acres
Janitorial Supplies
Software Maintenance & Support
Page3of8
EXHIBITB
9/1312004
..
Warrant No.
64570
64571
64572
64573
64574
64575
64576
64577
64578
64579
64580
64581
64582
64583
64584
64585
64586
64587
64588
64589
64590
64591
64592
64593
64594
64595
64596
64597
64598
64599
64600
64601
64602
64603
64604
64605
64606
64607
64608
64609
64610
64611
64612
64613
64614
64615
64616
Vendor
BIA/SC -Building Industry Association
C&H Distributions, Inc.
Cal-Glass, Inc.
California Auto Collision
California Automatic Gate
Caltrol, Inc.
Cambridge Isotope Labs
Cameron Welding Supply
Canvas Photo Giclee
Center for Creative Growth
Center for Demographic Research
City of Orange
Commercial Roof Management, Inc.
Communications Performance Group, Inc.
Computer Protection Technology, Inc.
Computer Sciences Corp.
Consolidated Elect. Distributors, Inc.
Consumers Pipe & Supply Co.
Cooper Cameron Corporation
Corporate Express
Cortech Engineering
Cost Containment Solutions
Counterpart Enterprises, Inc.
County of Orange -Auditor Controller
County Wholesale Electric Co.
Culligan of Orange County
Cytec Industries, Inc.
CR&R, Inc.
CRG Marine Laboratories, Inc.
CWCI -California Workers' Compensation
Daniel Company, L.L.C.
Dapper Tire Co.
David's Tree Service
Del Mar Analytical
Department of Consumer Affairs
Detection Instruments Corporation
Dunn-Edwards Corporation
DGA Consultants, Inc.
Ecology Control Industries
Edinger Medical Group, Inc.
Electrical Reliability Services, Inc.
Enchanter, Inc.
Environmental Microbiology Consulting
Excel Door & Gate Company, Inc.
ENS Resources, Inc.
Filterline Corporation
Fisher Scientific
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPTIC1aims Paid Report· 083104.xls
fin/210/lc
Claims Paid From 08/16/04 to 08/31/04
Amount
199.00
191.41
55.23
1,527.31
92.81
4,477.84
377.36
812.49
236.83
2,500.00
250.00
9,570.00
2,050.00
4,000.00
24,084.57
4,154.16
479.88
105.29
2,501.23
6,297.03
5,444.02
710.08
1,208.47
3,140.00
49.32
40.00
247.23
2,520.00
750.00
107.36
4,500.00
564.25
6,340.00
3,784.00
150.00
5,596.79
336.99
8,782.50
6,532.42
935.00
969.00
6,300.00
1,700.00
497.00
15,040.42
148.68
6,596.84
Description
Training Registration
Lab Parts & Supplies
Lab Equipment Service
Truck Repairs -V-495
Automatic Gate Maintenance & Repairs
Mechanical Parts & Supplies
Lab Parts & Supplies
Welding Supplies
Frames
Professional Services -0 & M Management Coaching
Census Data
Construction -Raising (11) OCSD Manholes to Grade
Construction -Remove and Replace Skylights at Bldg. 6
Professional Services -Safety & Health Program Audit
Computer Maint. Agreement
Consulting & Lab Services-Assay Pilot Project
Electrical Supplies
Plumbing Supplies
Lube Oil & Engine Supplies
Office Supplies
Pump Supplies
Worker's Comp. Services
Mechanical Parts & Supplies
2004-05 Public Attribute Tape -Assessor Parcel Records
Electrical Parts & Supplies
Maint. Agreement -Cen Gen Water Softener System
Anionic Polymer Spec. No. 9798-18
Container Rentals
Lab Analysis
Publication
Repair & Maintenance Services -Foul Air Scrubber
Truck Tires
Tree Maint. Service
Analysis of Biosolids and Wastewater
Employee Professional Electrical Engineering License Renewal
Ins. Parts & Supplies
Paint Supplies
Professional Services -CCTV Data Evaluation & Support
Hazardous Waste Disposal
Medical Screening
Electrical Testing-Various Capital Projects
Ocean Monitoring & Outfall Inspection & Maintenance
Lab Analysis -Settleable Solids Research
Repair & Maintenance Services at Pits. 1 & 2 Gates
Professional Services -Legislative Advocate
Filters
Lab Supplies
Page4 of8
EXHIBITB
9/1312004
Warrant No.
64617
64618
64619
64620
64621
64622
64623
64624
64625
64626
64627
64628
64629
64630
64631
64632
64633
64634
64635
64636
64637
64638
64639
64640
64641
64642
64643
64644
64645
64646
64647
64648
64649
64650
64651
64652
64653
64654
64655
64656
64657
64658
64659
64660
64661
64662
64663
Vendor
Fountain Valley Rancho Hand Wash
Franklin Covey
Frasco Profiles
Pryor Seminars/Career Track
Frederick Pump & Engineering
G.E. Supply
Garland Manufacturing Co.
Gerhardfs, Inc.
Gierlich-Mitchell, Inc.
Gold Coast Awards, Inc.
Goldenwest Window Seivice
Grainger, Inc.
Graybar Electric Company
Great Western Sanitary Supplies
Guarantee Records Management
Haaker Equipment Company
Hagemeyer North America
Harold Primrose Ice
Harrington Industrial Plastics, Inc.
Home Depot
Hub Auto Supply
Industrial Distribution Group
Industrial Threaded Products, Inc.
lnfilco Degremont, Inc.
Interstate Batteries of Cal Coast
Invensys Systems, Inc.
Ionics Instrument Business Group
Iron Mountain
Iron Mountain Off-Site Data Protection
livine Pipe & Supply
livine Ranch Water District
IPI GrammTech, Inc.
J & L Industrial Supply
Jay's Catering
John Bell Pool Seivice
Johnstone Supply
Kaman Industrial Technologies
Kforce, Inc.
Lab Support
Liebert Cassidy Whitmore
Lucci's Gourmet Foods, Inc.
LA Chemical
LI NJ ER
Maintenance Technology Corp.
MarVac Electronics
McGarry Central
McMaster-Carr Supply Co.
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPnClaims Paid Report-083104.xls
fin/21onc
Claims Paid From 08/16/04 to 08/31/04
Amount
596.85
2,126.07
418.50
199.00
574.56
257.19
849.50
3,663.03
219.23
43.10
3,580.00
1,781.83
2,076.47
57.85
234.60
1,304.86
168.09
129.50
1,395.44
703.88
440.73
1,120.07
2,637.81
4,950.00
504.27
3,758.59
258.75
85.00
234.00
1,823.37
37.19
13,578.00
3,460.70
644.54
310.00
174.65
166.45
17,404.89
996.00
176.00
168.95
1,401.87
10,144.85
35.73
29.83
191.60
174.12
Description
Truck Wash Tickets or Gasoline
Office Supplies
Human Resources Background Reports-Recruitment
Training Registration
Pump Supplies
Electrical Parts & Supplies
Mechanical Parts & Supplies
Engine Supplies
Pump Supplies
Plaque
Window Cleaning Seivice -Spec. #990015
Mechanical & Lab Parts & Supplies
Electrical Parts & Supplies
Janitorial Supplies
Off-Site Records Storage
Misc.Vehicle, Parts, Repairs & Seivice
Safety Glasses
Ice For Samples
Mechanical Parts & Supplies
Misc. Repair & Maintenance Material
Vehicle Parts & Supplies
Small Tools & Mechanical Supplies
Mechanical Parts & Supplies
Repair & Maintenance Seivices -Bar Screens Reliability Evaluation
Batteries for Vehicles & Carts
Instrument Supplies
lab Parts & Supplies
Bid Document Storage Fees P1-37
Offsite Back-Up Tape Storage for NT Server
Electric Water Heater
Water Use
Software Maint. Agreement
Tools & Mechanical Supplies
Meeting Expenses
Maintenance Seivices for Administration Atrium Pond
Electrical Parts & Supplies
Motor
Temporary Employment Seivices
Temporary Employment Seivices
Professional Seivices -Human Resources Policies & Procedures
Meeting Expense
Sodium Bisulfite
Professional Seivice -DART MO 9-22-99
Mechanical Supplies
Electrical Parts & Supplies
Office Equipment Maintenance Agreement
Mechanical & Safety Supplies
Page 5of8
EXHIBITS
9/1312004
Warrant No. Vendor
64664 Midway Mfg. & Machining Co.
64665 Voided Check
64666 Mission Uniform Service
64667 Monster, Inc.
64668 National Filter Media Corporation
64669 Neal Supply Co.
64670 New Brunswick Scientific
64671 Ninyo & Moore Corporate Accounting
64672 Office Depot Business Services Div.
64673 Omega Industrial Supply, Inc.
64674 OneSource Distributors, Inc.
64675 Oracle Corporation
64676 Orange County Hose Company
64677 Orange County Vector Control District
64678 Orange Fluid System Technologies, Inc.
64679 Ortiz Fire Protection
64680 Oxygen Service Company
64681 OCB Reprographics
64682 Pacific Bell Internet Services
64683 Pacific Mechanical Supply
64684 Parker Supply Company
64685 Parson Water & Infrastructure, Inc.
64686 Permaseal
64687 Planet Associates
64688 Power Design
64689 Primary Source Office Furnishings, Inc.
64690 Progressive Business Publications
64691 Propipe
64692 PCS Express, Inc.
64693 Quinn Shepherd Machinery
64694 R.F. MacDonald Co.
64695 Rainbow Disposal Co.
64696 Ralnin Instrument, L.L.C.
64697 Raney Industries
64698 Reliastar Bankers Security Life Ins.
64699 RemedyTemp, Inc.
64700 Restek Corporation
64701 Royale Cleaners
64702 RMS Engineering & Design, Inc.
64703 Sancen Engineering, Inc.
64704 Schneider Automation, Inc.
64705 Schwing America, Inc.
64706 Shamrock Supply Co., Inc.
64707 Shureluck Sales & Engineering
64708 SkillPath Seminars
64709 Smith Pipe & Supply, Inc.
64710 Southern California Edison
H:\dept\fin\210\CRANE\FAHR\FAHR2004\SEPTICla!ms Paid Report· 083104.xls
fin/210nc
Claims Paid From 08/16/04 to 08/31/04
Amount
358.44
3,540.19
4,620.00
4,290.00
2,450.62
2,825.96
15,388.71
1,688.81
1,088.54
139.51
7,988.37
271.30
247.39
2,142.53
2,655.00
762.40
587.98
324.00
1,115.97
1,282.38
22,822.67
447.62
17,775.00
9,897.50
438.54
299.00
13,306.07
15.60
373.29
124.41
5,386.60
500.03
4,040.00
10,462.47
2,037.85
294.96
38.00
1,000.00
5,147.50
8,989.76
1,200.99
1,593.39
1,685.32
199.00
2,056.56
32.27
Description
Repair & Maintenance Service -High Rate Mixing Pump
Uniform Rentals
Notices & Ads
Filter Press Belts
Plumbing Supplies
Lab Parts & Supplies
Professional Services P1-76, J-77 & 7-41
Office Supplies
Janitorial Supplies
Electrical Parts & Supplies
Software Upgrade & Product Support
Hydraulic Hose Supplies & Parts
Pest Control
Plumbing Parts & Supplies
Quarterly Fire Sprinkler Inspection, Maintenance & Certification at Pit. 1 & Pit. 2
Specialty Gases
Printing Service -MO 1/26/00
Internet Service
Plumbing Supplies
Mechanical Parts & Supplies
Professional Services J-42
Lube Oil
Software -Cable Asset Management
Electrical Parts & Supplies
Office Furniture
Subscription
CCTV Sewerline Inspections
Courier Service
Filters
Repair & Maintenance Supplies
Trash Removal
Lab Parts & Supplies
Contract Service -Belt Press Equipment Repairs
Employee Life Ins. Premium, Short-Term Disability & Cancer Ins. Payroll Deductions
Temporary Employment Services
Lab Parts & Supplies
Uniform Laundering Service
Engineering Services -Structural Evaluation 0 & M Library Floor System at Control Center
Construction -Pump Out (3) Air Jumper Lines
Software Mainl Agreement
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Training Registration
Plumbing Supplies
Power
Page6of8
EXHIBITS
9/13/2004
,.,, .,
Warrant No. Vendor
64711 Southern Contracting Company
64712 Southwest Air Balance Corp.
64713 Sparling Instruments, Inc.
64714 Spex Certiprep, Inc.
64715 Stephanie Remington
64716 Summit Steel
64717 Sunset Ford
64718 Sunset Industrial Parts
64719 Technical Service Group, Inc.
64720 Synegi, Inc.
64721 SBC
64722 SETAC
64723 Solar Turbines, Inc.
64724 SPEC Services, Inc.
64725 SPX Valves & Control
64726 Terminix International
64727 The Carlon Products Co.
64728 The Procurement Connection, Inc.
64729 The Walking Man, Inc.
64730 Thomas V. Garlinger
64731 Thompson Industrial Supply, Inc.
64732 Time Motion Tools
64733 Tony's Lock & Safe Service & Sales
64734 Traffic Control Service, Inc.
64735 Truck & Auto Supply, Inc.
64736 Truesdail Laboratories, Inc.
64737 Tuttle-Click, Inc.
64738 Tyco Valves & Controls, LP.
64739 Teksystems
64740 Ultra Scientific
64741 Underground Electric Supply
64742 Underground Service Alert of So. Calif.
64743 The Unisource Corporation
64744 United Direct Marketing
64745 US Filter Westates Carbon
64746 Valley Detroit Diesel Allison
64747 The Vantage Group, L.L.C.
64748 Vapex, Inc.
64749 Verizon California
64750 Verne's Plumbing
64751 VWR Scientific Products Corporation
64752 The Wackenhut Corporation
64753 Waste Markets Corp.
64754 Waxie Sanitary Supply
64755 West Coast Switchgear, Inc.
64756 West-Lite Supply Company, Inc.
64757 Western Tech Service Company
H:\depl\fin\210\CRANE\FAHR\FAHR2004\SEPnClalms Paid Report -083104.xls
fin/210nc
Claims Paid From 08/16/04 to 08/31/04
Amount
1,678.60
615.10
3,048.28
237.98
2,500.00
6,434.02
156.94
1,061.50
1,381.60
2,544.83
33.32
920.00
144.70
1,866.01
634.11
940.00
285.38
95.00
1,075.00
1,365.00
3,472.72
268.23
369.26
283.38
279.30
1,389.00
21,978.84
447.92
1,600.00
116.59
2,250.00
1,310.40
281.42
2,873.79
4,262.01
865.00
24,434.00
4,960.00
3,467.66
3,772.57
1,517.47
12,815.13
23,249.52
1,035.98
4,390.00
317.76
42.29
Description
Installation of (15) Cart Charging Stations In Bldg. 5
Professional Services-Air Flow Testing In Pilot Test
Flow Meter
Lab Parts & Supplies
Environmental Consulting Services -Santa Ana River Bat Population Study
Metal
Auto Parts & Service
Mechanical Supplies
SCADA System VAX Service Agreement
Software, Support & Maintenance
Telephone Services
Training Registration (Society of Environmental Toxicology & Chemistry)
Mechanical Parts & Supplies
Engineering Services SP-94
Valves
Pest Control
Lab Parts & Supplies
Training Registration
Printing & Distribution of Public Notice Door Hangers -1-2-4 & 7-36
Lab Analyses
Mechanical Supplies
Tools
Locks & Keys
Traffic Safety Equipment Rental
Automotive Supplies
Lab Analyses -AS Plant Stress Test
(2) 2004-05 Dodge GEM 4-Passenger EV Vehicles
Valve Limit Switches
Temporary Employment Services
Lab Supplies
Electrical Repairs & Maintenance Services
Membership -Notification of Excavations Near OCSD Facilities
Office Supplies
Public Notice Door Hangers Printing & Distribution Service -1-2-4
Filters
Repair & Maintenance Services -Generator
Temporary Employment Service
Instrument Parts & Supplies
Telephone Services
Service Contract -Testing & Cert. Backflow Devices at Pits. 1 & 2 & Pump Sta.
Lab Supplies
Security Guards
Maint. Agreement -Grit & Screenings Removal & Digester Bed Mat'I. Removal
Janitorial Supplies
Electrical Parts & Supplies
Electrical Supplies
Instrument Parts & Supplies
Page7 of 8
EXHIBITS
9/1312004
Warrant No.
64758
64759
64760
64761
64762
64763
64764
64765
64766
64767
64768
64769
64770
64771
64772
64773
64774
64775
64776
64777
64778
64779
64780
64781
Vendor
Wilmington Instrument Co., Inc.
WEF
Xerox Corporation
California Bank & Trust
Orange Community Bank
Teotimo C. Albia
Kenneth W. Aplon Jr.
Nicholas J. Arhontes
Shabbir S. Basrai
Darrin L. Canen
Kelly J. Christensen
Martin A. Dix
Jerry F. Evangelista
Deirdre E. Hunter
Linda Losurdo
Patrick W. McNelly
Gary A. Pons
Ellen Ray
County of Orange -Auditor Controller
Orange County Sanitation District
Polk, Robert S. and Dell
Ridgeline Country Club
SETAC (Soc. of Environ. Toxicology & Chem.)
Adams/Mallory Construction Co., Inc.
Total Accounts Payable -Warrants
Payroll Disbursements
34621 -34716 Employee Paychecks
101382 -101912 Direct Deposit Statements
Total Payroll Disbursements
Wire Transfer Payments
OCSD Payroll Taxes & Contributions
U.S. Bank
Total Wire Transfer Payments
Total Claims Paid 08/16/04-08/31/04
H:\depl\fin\210\CRANE\FAHR\FAHR2004\SEPTIClaims Paid Report-083104.xls
fin/210nc
Claims Paid From 08/16/04 to 08/31/04
Amount
1,039.98
455.00
4,425.46
5,586.00
21,787.00
46.00
230.00
112.00
334.72
138.00
269.79
679.18
837.22
163.19
135.96
41.00
378.20
175.00
1,305.00
639.49
3,000.00
75.00
515.00
23,667.00
$ 10,618,027.36
$ 153,830.50
1,034,653.80
$ 1, 188,484.30
753,283.10
$ 33,392.42
$ 786,675.52
$ 12,593, 187.18
Description
Instrument Parts & Supplies
Membership -Water Environment Federation
Metered Copy Usage & Supplies
Construction J-33-1A, Retention
Construction P2-82, Retention
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Administrative Processing Fee for Special Assessment Adjustments
Petty Cash Reimb.
Employee Computer Loan Program
Damage Claim
Envir. Compl. & Mon. Div. Meeting Registration (Soc. of Environ. Toxicology & Chem.)
Construction P2-79-1
Biweekly Payroll 08/18/04
Biweekly Payroll 08/18/04
Biweekly Payroll 08/18/04
August Interest Payment for Series 2000, A & B Certificates of Participation
Page 8 of8
EXHIBITS
9/13/2004
'1 •
BOARD OF DIRECTORS
AGENDA REPORT
Orange County Sanitation District
FROM: Gary Streed, Director of Financerrreasurer
Originator: Lenora Crane, Executive Assistant
Meeting Date To Bd. of Dir.
10/27/04
Item Number Item Number
8
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
CONFLICT OF INTEREST NOTIFICATION
Pursuant to Government Code Section 84308, you are required to disclose any campaign
contribution greater than $250 received in the past twelve months from any party to a contract
involving the Orange County Sanitation District. Further, you may not participate in the decision
making process to award a contract to such party .
For reference , you are directed to the Register of Warrants as to all current contractors/vendors
with the District.
In general, you must disclose the basis of the conflict by identifying the name of the firm or
individual who was the contributor.
For the specifics of Government Code Section 84308, please see your Director's Handbook or
call the office of General Counsel.
SUMMARY
See attached listing .
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ATTACHMENTS
1. Copies of Claims Paid reports from 09/01/04 -09/15/04 and 09/16/04 -09/30/04
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Repo rts\1004\ltem 8.ClaimsPaid .doc
Revised : 06/04/03
Warrant No. Vendor
Aecount! Pgabta • Wargnts
84782
84783
84784
84785
84788
84787
84788
84789
84790
84791
84792
84793
84794
84795
84798
84797
84798
84799
84800
84801
84802
84803
84804
84805
84808
84807
84808
84809
64810
84811
84812
84813
84814
84815
84818
84817
64818
84819
64820
84821
84822
84823
84824
84825
84828
64827
64828
84829
Southam Csllfornla Edison
Airgas Safety, Inc.
Alan Jeffery
Amerfcan Afrt!nea
Amerfcan Chemlcal Society
Amertcan Society for Quality
Aquarium Docfor
American Telephone & Tetagmph Corp.
American Telephone & Telegraph Corp.
Bell Pipe & Supply Co.
BMC: Business Machines Consultants, Inc
City of Tustin
Court Order
Compressor Components of Csllilrnla
Consotldatad Elect. Distributors, Inc.
Consumers Pipe & Supply Co.
Cooper Energy Services
County of Omnge
Court Trustae
Danka Offtce Imaging
Department of Chlld Support Services
OHL Express (USA), Inc.
Employee Benefits Speclallsta, Inc.
Court Order
ExecuHva Software
EDT Aldlengeaellschaft
FedEx Corpomtlon
Fisher Sclentlffc
Fmnchlse Tax Board
Fry's Eleclronlcs
G. E. Modular Space
GBC (General Binding Corp)
Haestad Methods
Harbour Engineering Group
City of Huntington Beach
Industrial Metal Supply
Internal Revenue Service
Internal Revenue Service
Intl. Union of Oper. Eng. AFL-CIO Local 501
Kelly Paper
MassMutual Michel Financial Group
McMaster-Csrr Supply Co.
Midway Mfg. & Machining Co.
Court Order
National Bond & Trust
City of Newport Beach
Orange Fluld System Technologles, Inc.
Oreo Construction SuPply
H:\depl\fln\210\CRANE\FAHR\FAHR2004\SEPTICl8lma Paid Report -091504.Jcla
ftn1210Jlc
Clafma Paid Fram 09/01104 to 0911ll04
s
Amount
70,809.22
1,523.81
745.75
3,531.00
284.00
109.00
105.44
1,604.28
834.82
562.59
1,838.72
831.25
150.00
15,513.71
8.13
840.19
23,544.37
182.14
89.12
151.81
188.50
18.80
9,888.15
445.00
1,150.82
22,500.00
183.82
118.81
50.00
293.02
377.13
47.47
1,155.00
8,158.08
17,982.82
78.72
300.00
200.00
3,890.54
104.54
1,302.07
1,110.83
8,528.38
225.00
2,439.20
44.04
713.88
142.78
Dw:rlptlon
Power
Sa!ety Supplies
Reconciliation User Fee Refund Pragmm
Tmvel SelVlca
Membership
Membership
Human Resoun:es Aquarium Service
Tetephone Conference Services
Telephone Service
Plpfng Supplles
(1) Stapler1Staclrer
Water Use
Wage Garnishment
Valves
Eledrical Supplies
Plumbing Supplies
Engine Supplles
wage Garnishment
Wage Garnishment
HP LaserJet Printer Repa!JS & Malnt.
Wage Garnishment
Freight Services
Reimbursed Prepaid Employee Medlcal & Dependent care
Wsge Garnishment
Software Malnt. Agreement
Mechanical Parts & Supplies
Freight Services
Lab Supplies
Wsge Garnishment
Computer Supplies
Field Offtca Trailer at Pll. 1 -Addltlonal Costs
Lab Parts & Supplles
Software & Support
Impeller linens
WsferUse
Metal
wage Garnishment
Wage Garnishment
Dues Deduction
Paper
Executive Dlsablllly Plan Premium
Machanlcal Parts, Maintenance Materials & Tools
Belt Prass Repairs & Maintenance Service
Wage Garnishment
U.S. Savfngs Bonds Payroll Deductions
Water Use
Plumbing Parts & Supplies
Marking Paint & Toots
Page 1 of9
EXHIBIT A
8l28l2004
Warrant No.
84830
84831
84832
84833
84834
84835
84838
84837
84838
84839
84840
84841
84842
84843
84844
84845
84848
84847
84848
84849
84850
84851
84852
84853
84854
84855
84858
84857
84858
84859
84880
84881
84882
84883
84884
84885
84888
84887
84888
84889
84870
84871
84872
84873
84874
84875
84878
84877
84878
Vendor
OCEA
Court Order
Parker Hannlfln Corporation
CourtOnfer
Peace Offtcara Council of CA
Pen Valve
Prfmary Source Office Furnishings, Inc.
Pumping Solutions, Inc.
Sancon Engineering, Inc.
Santa Ana River Flood Pro!edlon Agency
Smardan Supply Company
Court Order
Southern Counties Lubricants
Sparkfetts
Spex Certlprap, Inc.
SBC
SKC-West, Inc.
SPX Valves & Control
Rand McNally Map & Travel Store
Thompson Industrial Supply, Inc.
United Parcel Servfca
Unlted\fmy
US Equfpment Co., Inc.
Verizon
Verizon Cellfomla
Sonja A \Naagran
Wsstewater Technology Tralnem
\/Veatem Tech Service Company
VJEF
Court Order
MarcA Brown
James L. Burror
Deirdre E. Hunter
Mlclmel D. Moore
Adam A Nazaroff
Quynh D. Nguyen
Fred J. O'Brien
Doug Rulison
Richard E. Schlegel, Jr.
Ann Tobin
Edward M. Torres
Chartes F. Wf1"180r
Cellfomla Dept. of Fish and Game
ADS Envfronmental Services, Inc.
AKM Consultlng Engineers
Black & Veatch Corporation
BMC: Business Machines Consultants, Inc.
Cerolfo Engineers
CH2MHDI
H:\dept\tl"'210\CRANE\FAHR\FAHR2004\SEP1\Clalma Paid Report • 091504.xll
flnl210/!c
Clalnw Paid From 09101/04 ta 09111104
Amount
598.98
40.00
758.71
298.00
1,584.00
18.99
1,207.88
413.28
15,545.00
1,400.00
85.35
721.50
2,489.03
1,388.99
1,092.17
975.18
1,255.29
3,378.19
9,923.78
2,441.81
1,058.11
245.00
1,082.04
81.29
358.10
210.00
350.00
1,833.80
278.00
597.50
420.48
131.00
385.40
220.00
105.35
512.75
889.07
210.30
751.43
131.00
387.12
527.59
127.25
47,917.50
25,297.31
844,835.33
38,482.71
483,422.37
49,737.82
Descrfptfon
Dues Deduction
VGge Garnishment
Mechanical Parts & Supplies
Wsge Garnishment
Dues Deduction
Plumbing Parts & Supplies
Office Supplles
Pump
Conatrucllon -Manhole Rehabilitation Program
Membership
Plumbfng SuppUas
Wage Garnlshmenl
Hydraulfc 011
Drfnkfng Water/Cooler Renlals
Lab SUpplles
Telephone SelVlces
Lab Parts & Supplies
Valves
GIS Databaaa & Map Viewer Softwara
Mechanlcal Supplies
Pan:el Services
Employee Contributions
Afr Compressor
Telephone Servfca
Telephone Services
Meeffng/Tmln!ng Expense Reimbursement
Training Registration
Chemlcala & Detergents
Membemh!p -\M!fer Environment Federation
VGge Gamlshmenl
Meetfng/Tralnfng Expense Refmbursement
Meetfng/Tmlnlng Expense Reimbursement
Meet!ng/Tmlnlng Expense ReJmbursement
MeetJng/Tralnlng Expense Relmburaemenl
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeflng/Tmlnlng Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Refmbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Pennll Fee -Stream/Lake Alteration Agrmt. far Malnt. Access to Santa Ana River Bed
Proteaslonal services J-73-2
Pmfesslonal Services 7-39
Englneerfng Services P1-78, J-71-3, P1-102 & J-77
(1) MultHilncllonal Copier & Stapler/Staclcer, Software, Supplles & Toner
Professional Services P2-88
Engtneerfng Services J-40-7
Page2of9
EXHIBIT A
8l28l2004
Warrant No.
84879
84880
84881
84882
84883
84884
84885
64888
84887
84888
84889
84890
84891
84892
84893
84894
84895
84898
84897
84898
84899
84900
84901
84802
84903
84904
84905
84908
84907
84908
84909
84910
84911
84912
84913
84914
84915
84918
84917
84918
84919
84920
84921
84922
84923
84924
84925
84928
84927
Vendor
GHD, l.l.C.
IPMC clo Parsons
Kaiser Foundation Health Plan
Kemlron Companfes, Inc.
lee & Ro, Inc.
MWH Amerfcas, Inc.
NWRI National water Research lnstituta
Parsons water & Infrastructure, Inc.
Pioneer Americas, Inc.
Polydyne, Inc.
SPEC Services, Inc.
Tetra Tech, Inc.
Tula Ranch/Magan Fanns
U.S. Peroxide, L.L.C.
Mika Prlfch & Sons
Steve P. Rados, Inc.
Union Bank of Cslffomla
Abrasive Engineering Tool & Equip.
Acoustical Material Services
Adamson Industries
Afn:o Filter Servlc:e
Airgas Safety, Inc.
American Flldellty Assurance Company
American Machinery & Blade, Inc.
Analytlcal Producls Group, Inc.
Appliance Specialists
Ashbrook Corporation
Aspen Publishers, Inc.
Plem Clark -Atkins water
Awards & Trophies Company
ACS Hydraulics, Inc.
AT&T Universal Biller
AWSI
Baker Tanks
Bar Tech Telecom, Incorporated
Ban:o Products Company
Basic Chemical Solutions, L.L.C.
BloMerleux Vitek, Inc.
Boise W>rkspace
Brlnderson
BEC-Bulldfng Electronic Controls, Inc.
Csllfomla Hazardous Setvlces, Inc.
Csmbrfdge Isotope Labs
Csmeron Walding Supply
cart Wlnan & Co.
Cssual Gourmet
Cfngular Wlreless Equfpment
Cole-Parmer Instrument Co.
Columbia Analytical Setvlces, Inc.
H:\dept\f!n\210\CRANE\FAHR\FAHR2004\SEPTIClalma Paid Report. 091604.xt•
fln121Dnc
Clalma Paid From 09101#04 to 0911ll04
Amount
58,155.00
882,034.00
58,840.98
98,020.32
80,884.74
125,530.59
50,000.00
29,413.45
77,940.59
53,781.05
72,525.98
48,854.15
159,589.71
87,121.54
118,110.59
447,028.20
49,889.80
25.78
805.29
1,547.72
89.41
411.39
38.50
138.44
895.00
75.00
2.241.38
252.30
2,320.00
28.81
794.82
5,791.87
133.00
13,005.00
8,883.93
95.40
12,105.33
1,079.00
2,197.27
404.00
303.32
4,050.00
1,109.03
72.19
299.01
117.72
38.19
455.81
870.00
O..Crlp!lon
Professional Services -Asset Management Program
Professional Services -Integrated Program Management
Medical Insurance Premium
Fentc Chlorlde MO 9-27-95
Professlonal SeJVlces P2-47-3 & 5-52
Profesakmal Services P2-74
Membership
Professional Services J-35-1
Sodium Hypochlorffa
cationic Polymer MO 3-11-92
Engfneerfng SelVlces J-83 & J-33-1
Professional Servlc:es 7-37
Residua!& Removal MO 3-29-95
Odor & Corrosion Control Traabnent for Coll. Sys.; Hydrogen Peroxide & Ferrous Chloride
Construction 8-13-3
Construction 1-2-4
Conslructlon 1-2-4, Retention
Repair & Maintenance Material
CeillngTDe
Lab Parts & supplies
011 FUters
Safety Supplies
Employee cancer Insurance
Saw Blades
Lab Parts & Supplies
Dishwasher Repalm -Board Room Kitchen
Mechanical Parts & Supplies
Subscription
Engineering/Lab Testfng -Anaerobic Baffled Reactor Pilot Plant
Plaques & Awards
Motor Repairs
Telephone Service
Department ofTransportatlon Program Management & Testing
Tank Rentals
Telephone Equfpment Malnt. & Service
Partdng Lot Safely Equipment, Supplfes & Hardware
Sodium Blsulflte & Sodium Hydroxide
Lab Supplies
ModJflcatlons to W>rbtatlons -Envfronmantal Complfance & Monitoring Div.
Profe&&lonal Services P2-78
Fire Alann System Maintenance, Repair & Quarterty Inspection
Fiiter & Transfer Diesel Fuel frum Baker Tanks to UST
Lab Parts & Supplies
Weldlng Supplies
Insurance Claims Administrator
Meeting Expenses
Equipment & Tax on Free Phones
Tubing
Analyses of vmet.ewater, lnduatrtal V\Bdawater & Blosollds
Page3of8
EXHIBIT A
8l28l2004
Warrant No.
64928
64929
64930
84931
84932
64933
64934
84935
64938
64937
64938
64938
64940
64941
64942
64943
84944
64945
64948
84947
64948
64949
84850
84951
84952
84953
84954
84855
84858
84957
84958
84959
84980
84981
84982
84983
84984
64985
84988
64987
84988
84989
84970
84971
84872
84973
84974
84975
84978
Vendor
Consumers Pipe & Supply Co.
Coolant Management SelVfces
Cooper camarun Corporation
Corporate Express
County Wholesale Electric Co.
CUmmlna cat Paclflc, Inc.
Csflfomfa Special Drstrtcls Association
Daniel Envfrunmantal, L.L.C.
Dapper Tfla Co.
David's Trae Service
Del Mar Analytical
Dhanna Consulting
Dlonex Corporation
Dunn-Edwards Corporation
DL T Solutions, Inc.
Eagle Aerial Imaging
Enchanter, Inc.
Envlronmental Englneerfng & Contracting
Equapac
Fisher Scientific Company, L.L.C.
Flo -Systems, Inc.
Foadcraft Cofrae & Reflushment Serufcas
Fortis Benefits Insurance Company
Fountafn Valley Paints, Inc.
Franklin Covey
G. E. Supply
Ganahl Lumber Company
Ganatt-Callahan Company
GlerUch-Mttchell, Inc.
Grainger, Inc.
Great W!stem Sanltaiy Supplies
Hach c/o Ponton lndustr1es
Harold Primrose Ice
Harrington Industrial Plasffca, Inc.
High lmpad Priority Training
Hlll Brothers
Hlstoiy Aaaoclates, Inc.
Haerblger Service, Inc.
Home Depot
Hub Auto Supply
HOR Englneerfng, Inc.
I. D. Industries, Inc.
Industrial Distribution Group
Industrial Thraaded Products, Inc.
Irvine Ranch water Dlstrlct
ISA
ISEC, Inc.
J & L Industrial Supply
Jay's CalBrfng
H:\dept\fln\210\CRANE\FAHR\FAHR2004\SEPTIClalm9 Paid Repcrt -091504.ldl
fln121ctnc
Claims Paid Fntm 09/01/04 ta 091111D4
Amount
1,357.80
742.21
379.80
2.809.58
189.73
1,907.15
275.00
8,820.00
213.12
14,040.00
1,994.00
15,725.00
343.54
145.95
7,012.37
9,394.25
3,800.00
s.000.00
1,800.49
4,488.49
2,419.22
280.82
24,819.59
90.78
888.88
1,022.15
328.48
284.18
1,288.17
833.81
53.01
2,253.83
74.00
4,491.88
510.00
20,084.02
4,887.34
222.01
199.78
518.33
8,025.81
102.00
1,558.04
3,180.93
3.90
2,520.00
4,045.00
517.20
158.28
DfJlcrfptlon
Plumbing Suppllea
Orllllng & Cutting Auld
Engine Supplies
Office Supplies
Eledrfcal Parts & Supplies
lndustrtal Tank Heater
Training Registration
lnstallatfan of Zero Leakage Damper
Truck Tires
Tree Ma!nt. Service
Analysts of Blosollda and Wastawater
Prufeafonal Services • Strategic Plannfng & EMT Development
Lab Parts & Supplies
Paint Suppllea
Map Subscription & \Miii Support
Aerials on DVD & Software License
Ocean Monitoring & Outfall Inspection & Malntsnance
Prof. Serv. -Industrial Waslawater Operator Training & Foll01M-Up Audlls
Hydrochloric Add
Lab Parts & Supplies
Pump Supplies
Meeting Supplies
Long-Tenn & Short-Tenn DlsabllHy Ins. Premium
Paint Supplies
Office Supplies
Drfp Proof Motor
Lumber/Hantt.vare
Chemlcala
Pump Parts & Supplies
Mechanical Parts, Supplles & Tools
Janitorial Supplies
Lab & Inst Pads & Supplies
Ice For Samples
Plumb!ng Supplles
On-SffB Forklift Tralnfng
Chemlcals -Odor & Conoalan Control -Newport Trunkllne
Profasslonal Services -Study of Records, Photographic Materials & Reports
Compressor Pads
Misc. Repair & Ma!nfanance Material
Vehicle Parts & Supplies
Construction P2-82
Mechanlcal Pads & Supplies
Tools
Fasteners
\l\aferUse
Ins. & Elec. Malnt. Div. Meeting ReglstraUon (lntn'I. Assoc. for Meas. & Conlrol)
Lab Parts & SUpplles
Tools
Meeting Expenses
Page4of9
EXHIBIT A
8l28l20D4
Warrant No.
84977
84978
84979
84980
84981
64982
84983
84984
84985
84988
84987
84988
84989
84980
84991
84992
84993
84994
84995
84998
84997
84998
84999
85000
85001
65002
85003
65004
65005
85008
65007
85008
85009
85010
85011
85012
85013
85014
85015
65018
85017
85018
85019
85020
85021
85022
85023
85024
85025
Vendor
John Bell Pool Service
JWC Environmental
Kan:her Insulation, Inc.
Kant Fluid Power Div. of AIT
Lab Safety Supply, Inc.
La Motte Chemical Producls
Maintenance Technology Corp.
Managed Health Network
Mc.Junkin Corporation
McKenna Englnearfng & Equipment Co.
McMaat.er-Carr Supply Co.
Megger
Mllltronlcs, Inc.
Mltchell Instrument Co.
MARMAC Field Services, Inc.
National Plant Services, Inc.
Neal Supply Co.
Nlnyo & Moore Corpomte Accounting
The Non::o Companies
Oxygen Service Company
OCB Reprugraphlcs
P.L. Hawn Company, Inc.
Pacific Blue Mfcm
Paclftc Mechanical Supply
PalnLJob.c:om
Parker Supply Company
Parkhouse Tire, Inc.
Paul Pitt
Peerfess Wiping Materials Co.
Parma Pure, Inc.
Pnt-Pald Legal Services, Inc.
Primary Source Office Fumlshlngs, Inc.
Profit Techniques, Inc.
PCG Industries
PCS Express Inc.
QAlr Csllfomta -Div. Pump Engineering
Quinn Power System Asaoc.
R & R Instrumentation, Inc.
Red Valve Company, Inc.
Rellaatar
Ricoh Business System
Rite In The Rain
Rotork Controls, Inc.
RBF Engineers
8afety Center, Inc.
Sartorius Corporation
Schwing America, Inc.
Scottel Voice & Data Inc.
Seaventures
H:~pl\tln\210\CRANE\FAHR\FAHA2004'8EPnClalms Paid Report· 091604.xll
ftnl210l!c
Clalma Paid Fntm 09/01104 to 09/11104
Amount
310.00
9,897.92
378.48
102.55
57.59
98.88
518.SO
950.94
9,417.38
2,354.71
894.93
1,185.23
4,185.73
335.71
14,911.00
440.00
5.50
17,340.89
180.48
2,502.92
3,889.92
3,303.97
9,854.27
794.28
2,975.00
2,584.04
355.11
5,054.43
580.30
382.84
433.55
3,622.07
1,582.50
3,175.00
122.00
243.84
233.85
290.89
853.83
9,993.80
1,823.90
238.71
2,542.82
18,353.83
600.00
198.00
2,382.57
2,284.80
5,550.00
Description
Maintenance Services -Adm!n Bldg. Atrfum Pond
Upgrade Muffin Monster Grfnder for Digester No. 11
Repair Bolter Insulation On Boller No. 2
Electrfcal Parts & SUpplles
Lab Parts & Supplies
Lab Parts & Supplies
Mechanical Supplies
Employees Assistance Prugram
Mechanical Parts & Supplies
Mechanical Parts & Supplies
Mechanical Parts, Supplies & Toots
Software
Electrical Supplfes
Instrument Parts & SUpplles
Professional Services P1-92
Vacuum Truck Services
Plumbing Supplies
Professional Services -Materials Testing, Inspection & Geotachnlcal Engrg.
Mall Delivery Service
Specialty Gases
Prfntfng Service -MO 1128/00
Eledrfcal Supplies
CISCO Soflwara Upgrade, SMARTNET Wnranty & Phone Support
Plumbing Supplies
Paint Supplies
Mechanical Parts & Supplies
Tlras
Pn>fesslonal Services SP-74
Janftortal Supplles
Fiiter
Employee Legal Service Insurance Premium
Office Fumltura -CUblcle Panels
Professional Services -0 & M Manager Coaching
Repair & Maintenance Service -Machine & Metal Spray Work
Courter Service
Filters
Hose
Instrument Supplies
Mechanical supplies
Employee Basic Life & Managers• Insurance Pramlums
Color Copier Lease
Lab Parm & Supplies
Motor Valve
Engfnearfng Services 2-24-1, 7-22-1 & 7-38
Training Registration
Lab Equipment Service
Pump Supplies
Telephone System Mafntenance
Ocean Monitoring Vessel
Page5of9
EXHIBIT A
8l28l2004
Warrant No.
85028
85027
85028
85029
85030
85031
85032
85033
85034
85035
85038
85037
85038
85039
85040
85041
85042
85043
85044
85045
85048
85047
85048
85049
85050
85051
85052
85053
85054
65055
85058
85057
85058
65059
85080
65061
65082
85083
85084
85085
85086
85087
65088
85089
65070
85071
85072
85073
85074
Vendor
Shamrock Supply Co., Inc.
Shortridge Instruments, Inc.
Shureluck Sales & Engineering
Sigma-Aldrich, Inc.
Smardan Supply Company -Fountain Valley
Smith Pipe & Supply
Southam Cslffomla \Nater
Southern Counties Lubricants
Sparling Instruments, Inc.
Speclalfzed Envlronmental, Inc.
Stanley Steamer lnt.ernallonal, Inc.
Summit Steel
Sunset Industrial Parts
SuperPowerProducls
SBC
SC\l\IMF
SPX Valves & Control
Teletrac. Inc.
The \Nalklng Man, Inc.
Thomas V. Gerflnger
Thompson lndusbtal Supply, Inc.
Traffic Control Service, Inc.
Transcat
Trt-State Seminar On-the-River
Tropical Plaza Nursery, Inc.
Truck & Auto Supply, Inc.
TMV Systems Engineering, Inc.
United States Postal Service
UnlvarUSA
Urban Altematlves
UCRegenls
Varian Associat.es, Inc.
Verizon Cslltomla
Vision Service Plan-(CA)
Vossler & Company
\MIR Scientific Products Corporation
The WBckenlwf Corporation
Veda SanHary Supply
vest-Lite Supply Company, Inc.
Weston Solutions, Inc.
Xerox Corpomflon
Patrick B. Csmahan
TenyW. Krle
Debomh L. Lindel
Umesh N. Murthy
Edward M. Tones
David A. Usher
CWEA-SARBS, Inc.
Kavlokfs, John
H:\depl\tln\210\CRANE\FAHR\FAHR2004'8EP1'Clalms Paid Report -091504.Jdl
flnl210Jlc
c1ar1m Paid Fram 09/01/04 to 09/11104
Amount
1,502.97
59.41
1,138.93
677.59
23.11
54.44
78.79
2,878.87
4,202.42
11,882.00
351.45
1,284.83
805.78
775.80
8,189.00
80.00
4,322.18
245.0Q
525.00
500.00
5,013.35
283.38
482.44
380.00
3,635.00
23.08
13,781.25
5,000.00
853.42
7,838.00
295.00
818.29
792.95
9,507.80
198.35
5,400.97
5,781.59
148.73
553.84
12,800.00
44.77
845.41
158.88
549.90
150.00
532.89
48.00
1,350.00
2,327.31
Dw:rfptlon
Janitorial Supplies
Instrument Paris & Supplies
Mechanlcal Parts & Supplies
Lab Parts & Supplies
Plumbing Supplfes
Mechanlcal Parts & Supplles
\NaterUsa
Engine Oil
Flow Meter
Construction 7-23-1
carpet Cleanfng Services
Melal
Mechanical Suppllea
JanftDrlal Supplies
Telephone Services
Meeting Registration -Envfronmental Compliance & Monitoring
Valves
Monthly Alr-Tfme Service Fee & SoftwaraJHardwara Malnt for Vehlcle Tracking Sys.
Publlc Notice Prfntfng/Dlslrfbutlon -7-23-1
Lab Analyses
Mechanical Parts & Supplles
Traffic Safety Equipment Rental
Eledrfcal Supplles
0 & M Meeting Registration
Contract Gruundskeepfng MO 5-11-94
Automotive Supplies
Software Progmmmlng Services
Postage
Chlorine
Profeaalonal Services -Community Relations & Coachfng Support
Tmlnlng Registration
MS VWrkstatlon Upgrade
Telephone Services
Vision Service PramJum
Mechanical Supplies
Lab Parts & supplies
Security Guards
Janltorfal SUpplles
Electrfcal Supp!les
Lab Analyses of Benfhlc Infauna! t>r Pennlt Requlrad for Cora Ocean Manlforfng Progmm
Copier Leases
Meetlng/Trafnlng Expense Reimbursement
Meeflng/Trafnfng Expense Relmburaement
Meeting/Training Expense Reimbursement
Meetfng/Tmlnfng Expense Refmburaement
Meetfng!Tmfnlng Expense Re!mburaement
Meeflng!Tra!n!ng Expense Relmbursament
Tm!nlng Regfstmtlon
Employee Computer Loan Progmm
Page8of9
EXHIBIT A
9l28l2004
Warrant No.
85075
85078
65077
85078
85079
85080
85081
85082
65083
85084
65085
65088
85087
85088
85089
85090
85091
85092
85093
85094
85095
65096
85097
85098
85099
85100
85101
85102
85103
85104
85105
85108
85107
85108
85109
85110
85111
85112
85113
85114
85115
85116
85117
85118
85119
85120
85121
85122
65123
Vendor
Omnge County Sanitation District
ARCS Foundation, Inc.
HOR Englneerfng, Inc.
American Express
Dell Marketing, LP.
Delta Dental
Omnge County Water District
UBS Flnanclal Services, Inc.
Omnge County Sanitation District
Acroburr, Inc. #2
Air lndustrtes Corpomtlon
Airgas Safety, Inc.
Amerfmax Building Producls, Inc.
Anaheim Extrusion Co., Inc.
Anaheim Geneml HospHal
Aurora Pictures, Inc.
APW Enclosum Systems
APW Endosura Systems, L.L.C.
ARO Services
American Telephone & Telegraph Corp.
Bruce A. Chapman
Circuit Tech, Inc.
City of Brea -\Nater Dfvlsfon
City of Stanton
City of Yorba Linda
Court Order
Consolidated Elect. Distributors, Inc.
Consumers Pipe & Supply Co.
County of Omnge
Court Trustee
Cytec Industries, Inc.
Department of Chfld Support Services
Don V\.blf & Asaoclates, Inc.
Edwards llfesclence, L.L.C.
Employee Benefits Specfallsts, Inc.
Employers Group
Court Order
Exxon MobU Corp. # 18-GSR
FedEx Corpomtlon
Fisher Scientific Company, L.L.C.
Fitch, Inc.
Fmnchlse Tax Board
Fry's Electronlca
City of Fullerton
Gayle Balazs
Gmphlc Packaging Corp
Hagemeyer North America
Delrdm E. Hunter
Industrial Threaded Producls, Inc.
H:\depMm210ICRANE\FAHR\FAHR2004\SEPl\Clalms Paid Report -091504.xll
flnl21Q/lc
Clalma Paid From 09/01/04 to 09/11104
Amount
952.28
1,400.00
580.00
47,879.03
29,724.72
55,844.35
14,785,933.10
37,718.39
25,098.28
219.78
1,444.14
5,939.58
3,598.93
8,034.82
11,810.85
674.00
18,591.39
5,985.15
1,083.09
184.78
58.00
299.79
1.002.00
1,212.00
487.80
150.00
703.37
535.97
182.14
89.12
240.54
188.50
12,178.02
8,092.75
9,773.15
7,400.00
445.00
28.84
180.88
882.43
3,000.00
50.00
59.24
1,025.00
114.00
255.37
3,488.12
201.11
21.17
Dacrfptlon
Petty Cash Refmb.
Technical Services & Geneml Mgmt. Admfn. Meeting Reglstmtlon
Professlonal Services SP-74
Purchasing Csrd Progmm, Misc. Supplies & Services
(25) Desktop Computers
Dental lnsumnc:a Plan
Joint GWRS Project J-38
Remarkellng Fee -Sertms 2000 A & B Refunding Certlftcafes of Participation
V\brker'a Comp. Refmb.
Reconciliation User Fee Refund Progmm
Reconciliation User Fee Refund Progmm
Safety Supplies
Reconciliation User Fee Refund Program
Reconcfllatlon User Fee Refund Progmm
Recandllatlon User Fee Refund Progmm
Safety Tmlnfng Materials -Video
Reconcflfatlon User Fee Refund Progmm
Reconciliation User Fee Refund Progmm
Reconciliation User Fee Refund Progmm
Telephone Service
MeeUng/Tmlnlng Expanse Reimbursement
Reconciliation User Fee Refund Program
Recancfllatlon User Fee Refund Progmm
Reconcftlatfon User Fee Refund Progmm
Recanc:ltlatlon User Fee Refund Program
WJge Gamlshment
Electrfcal Supplies
Plumbfng Supplies
Wage Garnishment
Wage Garnishment
Anionic Polymer Spec. No. 9798-18
Wsge Garnishment
Instrument -Emtssfona Analyzer
Reconciliation User Fee Refund Progmm
Reimbursed Pmpald Employee Medical & Dependent care
Employee Assistance Progmm
Wage Gamlshmant
Reconciliation User Fee Refund Program
Fmlght Services
Lab Supplies
Annual Survefflance Fee for Serles 2000 A & B Certificates of Participation
Wage Garnishment
Computer SUpplfes
V\mterUsa
Claim Settlement
Reconcflfatlon User Fee Refund Progmm
Prasafptlan Safety Glasses
Regfslmtlon
Fasteners
Page7 of9
EXHIBIT A
8l28l2004
WamantNo.
85124
85125
85128
85127
85128
85129
85130
85131
85132
85133
85134
85135
85138
85137
85138
85139
85140
85141
85142
85143
85144
85145
85148
85147
65148
85149
85150
85151
85152
85153
85154
85155
85158
85157
65158
85159
85180
85181
85182
85183
85184
85185
85188
85187
85188
85189
85170
85171
85172
Vendor
Infernal Revenue Service
Internal Revenue Service
Intl. Union of Oper. Eng AFL-CIO local 501
J & B Auto Parts
James "Tex8' Cllmfe
K.P. lfndatrom, Inc.
Mac & Associates, An lndustrtal Dist. Co
Material Damage Appraisal of Long Beach
McMaster-Carr Supply Co.
Mission Unlfonn Service
Morgan, Kathlynn Frances Dees
National Bond & Trust
Nextel Communications
Nu-Way Laser Engraving
The Orange County Register
Omnge Auld System Technologles, Inc.
OCEA
Court Order
Court Order
Peace Officers Council of CA
PenValve
RestekCorp
Sanmlna Corp.
Shuraluck Sales & Engineering
Smardan Supply Company
Smffh Pipe & Supply, Inc.
Smffh-Emasy Company
Court Order
So. Csl. Gas Company
Southern Csllfomla Edison
Southam Mgr Grp, Inc. c/o O'Connor
Summit Steel
Sunset Industrial Parts
SBC
Thenno Eleclron Corp.
Thompson Industrial SUpply, Inc.
Tiison & Aaaoclates, L.l.C.
Times Community News
Truck & Auto Supply, Inc.
The Unlsoun:e Corporation
United Parcel Service
United Way
Universal Clrcufla, Inc.
Varian Associates, Inc.
Verizon Csllfomla
VWR Sclenflftc Producls Corporation
The \Mlckenhut Corpomflon
Weston Solutions, Inc.
Court Order
H:'depl\ftn\21DICRANE\FAHR\FAHR2004\SEP1\Clalma Paid Report • 091504.xll
fln1210llc
Clalma Paid Fram 09#01/04 to 09111104
Amount
300.00
200.00
3,888.98
125.90
1,170.00
4,847.00
1,211.18
135.38
2,898.80
4,854.42
225.00
2,485.38
1,413.45
913.54
8,374.20
527.18
589.38
40.00
298.00
1,584.00
48.42
200.00
140.90
19.28
882.70
91.80
8,083.53
721.50
24,277.55
9,171.71
5,882.87
289.58
99.13
18.95
205.00
109.23
3,000.00
93.75
53.34
153.17
32.00
245.00
2,149.28
25.90
2,584.31
11,484.29
5,407.11
18,740.00
597.50
Dw:rfptlon
Wage Garnishment
wage Garnishment
Dues Deducllon
Auto Parts & Supplles
Marine Consulting -Ocean Monitoring Vessel Construction Inspection
Environmental Consulting Services MO 12-9-80
Check Valve
Vehlcfe Damage Appmlsal
Mechanical Parts & Supplies
Unlfann Rentals
\"'9ge Garnishment
U.S. Savings Bonds Payroll Deductions
Cellular Phones & Air Time
Steel Tags
NoUces&Ma
Plumblng Parts & Supplies
Dues Deduction
Wage Garnishment
VJage Garnishment
Dues Deduction
Plumbing Parts & Supplies
Training Registration
Reconcltlatlon User Fae Refund Progmm
Mechanical Parts & Supplies
Plumbfng Parts & Supplies
Plumbing Supplies
Professional ServlcesJ-77, 7-23-1, 8-13-1 & P1-78
\Yage Garnishment
Natural Gas
Power
Valves
Metal
Mechanical Parts & Supplies
Telephone Services
Trafnlng Reglstmtlan
Mechanlcal SUpplles
Tmlnlng Registration
Notices & Ads
Automotive Supplies
Oftlce Supplm
Pan:el Servfces
Employee Conbfbutlons
Pest Control
MS \4.fortcstatlon Upgrade
Telephone Servfcea
lab Parts & Supplies
Security Guards
lab Analyses of Benthlc Infauna!
Wage Gamlshmant
Page8of9
EXHIBIT A
8l28l2004
Warrant No.
85173
85174
85175
85178
85177
Vendor
Yorba Lfnda water District
Fred J. O'Brien
GeomAtrix Consultants, Inc.
Kienow Assoclataa, Inc.
Paul Freeman
Total Accounta Payable· Warranta
payroll Dlllbul'!llDlnt!
34717 -34809 Employee Paychecks
34810-34810 Employee Paycheck
34811 -34917 Employee Paychecks
34918 -34919 Employee Paychacka
101913 -102441 Direct Deposl1 Statements
102442 -102978 Direct Deposit Statements
Total Payroll Dl9buruments
Wl11 Tramtar Payment1
OCSD Payroll Taxes & Contributions
OCSD Payroll Taxes & Contributions
JP Morgan Chase Bank
JP Morgan Chase Bank
Total wr11 Tramfer Payments
Total Clafnm Pafd 09101104 -09111104
H:'dept\ftn\210\CRANE\FAHR\FAHR2004\SEPl\Clalms Paid Report -091504>cl1
ftn1210J!c
Clal1m Paid From 09/01104 to 09118104
Amount
3,913.28
908.82
1,388.98
14,029.01
1,092.77
s 19.890.030.42
s 142,628.85
300.00
148,782.17
437.89
985,394.33
1,045,277 .95 s 2,322, 799.19
$ 723,532.24
747,582.28
39,544.07
119,988.88 s 1,830,807.47
$ 23,843,437 .08
Dncrlptlon
Reconcllfatlon User Fee Refund Program
Meetlng/Tmlntng Expense Rehnburaement
Legal SelVlces 1-2-4
Legal SelVlces 1-2-4
Claim Settlement
Biweekly Payroll 09/01/04
Returned Direct DeposH-Closed Account
Blweekly Payroll 08/15/04
AdJuslments
Biweekly Payroll 09/01/04
Biweekly Payroll 09/15/04
Blweekly Payroll 09/01/04
Biweekly Payroll 08/15/04
August lnterast Payment on Series 1993 Certlflcafes of Participation
Soclate Generale August SWap Payment on 1993 Series CertJftcafas of Participation
Page9of9
EXHIBIT A
8l28l2004
Claims Patel From 09111/04 to 09130104
Warrant No. Vendor
~~~~~~~~~~~~~
Accounts Payable· Warrants
85178
85179
85180
85181
85182
85183
85184
85185
85188
85187
85188
85189
85190
85191
85192
85193
85194
85195
85198
85197
85198
85199
65200
85201
85202
85203
85204
85205
85208
85207
85208
85209
85210
85211
65212
85213
85214
85215
85218
85217
85218
85219
85220
85221
65222
85223
85224
ADS Environmental Services, Inc.
Basic Chemical Solutions, L.L.C.
Blue Cross of Csllfomla
Brown & Csldwell
Csmp D111888r & McKee, Inc.
Carollo Ena!neera
Voided Check
Computational Systems, Inc.
Environmental Englneerfng & Contracting
Irvine Technology Corporation
J R Fllanc Construction
JPL Compressor Service, Inc.
Kem!ron Companies, Inc.
Malcolm Plmle, Inc.
Moreland & Associates
Pioneer Americas, Inc.
Primary Soun:e Offlca Fumlahfnga, Inc.
Sanr.on Engfneerlng, Inc.
South Coast Afr Quality Management Dist.
Southam Csllfomla Edison
Tula Ranch/Magan Farms
Turblex, Inc.
Tekaystema
U.S. Peroxide, L.l.C.
The Vantage Group, L.L.C.
Woodruff, Spradlfn & Smart
ARB, Inc.
J F Shea Construction, Inc.
J R Fflanc Construction
Margate Construction, Inc.
Morrow-Meadows Corp
Olsson Construction, Inc.
Paulus Englneerfng, Inc.
Southern Contracting Company
Toney Pines Bank
Union Bank of Csllromla
Ablaze Group, Inc.
Adams Services, Inc.
Adamson Industries
Advance Business Graphics
.Advanced Engfne Technology Corporation
Agilent Technologies, Inc.
Afr Liquide America Corp.
Airgas Safety, Inc.
Alfa-Laval, Inc.
Alhambra Foundry Co., Ltd.
Allen lnslruments & Supplles
s
H:\dept\fln\EXCEL.da\220\APSHARE\Clalms Paid ~lalm1 Paid Report -093004.xll
flnl210llc
Amount
57,908.70
29,183.45
321,589.45
70,500.43
107,893.39
30,352.01
47,853.52
117,103.15
28,228.00
74,047.05
188,082.72
90,954.83
255,478.89
29,903.75
370,135.54
28,294.08
95,470.60
33,901.37
142,578.88
333,551.80
82,889.99
31,879.00
182,889.93
25,720.00
195,872.48
848,n2.37
1,454,938.38
1,442,818.80
1,328.154.49
423,854.00
195,585.00
35,799.73
28,584.00
180,313.20
71,883.45
7,250.00
3,300.00
515.91
288.45
1,383.25
544.88
420.55
5,070.40
228.10
4,808.34
102.38
Description
Professional Services -J-73-2
Sodfum Blaulflte & Sodium Hydroxide
Medical Insurance Pramfum
Professlonal Services -P1-37, P2-41 & O & M Standards & Procedures Manual
Engineering Servlc:ea J-71-8
Professional Services -Coordinated Commercial Enterprise Study & P2-80
(2) Machfnery Vibration Analyzera & Speed Vue laaera for Speed Sensor KU
Professional Services -Fata, OD & Grease (FOG) Study
Temporary Employment Services
Repair & Malnt. Services -Replace Packing for Scrubbera 5, 8, 8 & 01, 02 & 03
Replace Csmshaft/Lobes -Engine No. 2, Pit. 1 Cen Gen; & OVerhaul Engine No. 2, Pit. 2
Fenlc Chloride MO 9-27-95
Professional Servlc:ea J-79 & P2-80
Audltfng Services
Sodium Hypoch!orlte
Office Fumltum & Accessarles
Construction -Manhole Rehabilitation Program
Annual Emission, Operation & Misc. Fees
Power
Reslduala Removal MO 3-29-95
Repair& Malnt. Servfcea-Turbl8X Blower
Temporary Employment Services
Odor & Corrosion Control Treatment for Coll. Sys.; Hydrogen Peroxide & Ferrous Chloride
Temporary Employment Service
Legal Services MO 7-28-95
ConatrucUon 7-41 & 7-39
Construction J-35-1, J-77 & J-71-3
Construction P1-78
Construction P1-37 & J-87
Construction P2-47-3
Construction P2-82
Construction 5-22-R1
Construction J-33-1A
Construction P1-78, Retention
Construction 7-38, Retention
On-Sffa Tmlnlng • Crystal Reports
Repair & Mafnl. Services -Pump Out/Clean Balcer Tanks
Lab Parts & Supplies
Prfnffng Service -Buafness Cards
Prof. Serv. -Prapam Documentation for PEMS Recertification
Lab Parts & Supplfea
Speclalty Gases
Safely Supplies
Eledrlcal Parts & Supplies
Manhole Frames & Covera
Instrument Parts & Supplies
Page1 af8
EXHIBITB
10/18'2004
Clalms Pald From 09/11J04 ta 09130/04
Warrant No.
85225
85228
65227
85228
85229
65230
85231
65232
65233
85234
85235
85238
85237
85238
85239
85240
85241
85242
85243
85244
85245
85248
85247
85248
85249
85250
85251
85252
85253
85254
85255
85258
85257
85258
85259
85280
85281
85282
85283
85284
85285
85288
85287
85288
85289
85270
85271
85272
Vendor
Alta-Robbins, Inc.
American Airlines
Amerfcan Flsherlea Society
Amerfcan Rad Cross
Analysts, Inc.
Aquatic Bloasaay And Consultlng Lab
Arizona Instrument
AssurX, Inc.
ABB Automation, Inc.
ABB Automation, Inc.
ARBIPERP -Air Resourms Board
ASTD-OC -American Society for Training
Amerfcan Telephone & Telegraph Corp.
AT&T Wireless Services
Baker Tanks
Bar Tech Telecom, Inc.
Basler Electrfc Company, Department 590
Bell Pipe & Supply Co.
Blocycle
Black & Veatch Corporation
Boller and Sfeam Parts.com
Bondloglstbc, L.l.C.
Bush & Associates, Inc.
BC Wire Rope & Rigging
BMC: Business Machines Consultants, Inc
Cslbol, Inc.
Csrdlock Fuel Systems, Inc.
Csrfeton Engineer& & Consultants, Inc.
Charles P. Crowley Co.
City of Tustin
Coast Fire Equipment
Cole-Parmer Instrument Co.
Columbia Analytlcal Sesvlces, Inc.
Comprassor Components Of Csllfomla
Computer Protection Technology, Inc.
Computer Sc:fences Corp.
Conaolldated E!ed. Distributors, Inc.
Consumers Pfpe & Supply Co.
Cooper cameron Corporation
Corporate Expresa
Corporate Image Maintenance, Inc.
County Wholesale Electric Co.
Crane Veyor Corp.
Cullfgan of Orange County
Cytec lndustrtes, Inc.
CEM Corporation
CR&R, Inc.
CWEA Membership
H:\dept\fln\EXCEL.d!a'220\APSHARE\C!alml Paid RepotnOH4\Cla11M Paid Report -093004.xla
flnl21Dllc
Amount
52.86
2,244.30
88.00
12.00
299.18
750.00
883.00
5,513.00
2,002.47
383.05
180.00
515.00
182.23
4,153.64
580.00
1,286.95
1,837.35
187.29
89.00
1,212.95
1,138.80
2,800.00
8,880.00
279.20
104.98
910.59
18,872.81
1,115.25
500.34
241.85
383.12
277.32
885.00
18,847.11
249.78
3,503.70
5,272.18
533.80
2,385.79
9,741.87
180.00
1,035.78
1,939.32
40.00
18,052.50
388.48
2,237.23
97.00
Description
Instrument Supplies
Travel Services
Publication
CPR Training & MlsceJlaneous Supplies
Testing Kils & Analyses
Whole Efftuent ToxfcHy Testing
Instrument Repairs
CATWEB Software Upgrades & Support
Instrument Sesvfca Malnt. -Contml!er Board
Instrument Cslfbratlon Sesvlce
Pennlt Fee -Statewide Portable Equipment Registration Program
Training Registration
Telephone SelVfce
Wrelesa Phone Sesvlces
Tank Rentals
Telephone Malnt. -18 Port Dfgltal Line Card for Pit. 2 PBX System
Eledrlcal Supplles
Pfplng SUpplles
Publlcatlon
Engineering Services P2-85
Safety Valves
Prof. Sesv. -Praparatlon of Interim Arbitrage Rebate Report Serles 2003 COPs
Protassfonal Seivlces J-77, 8-13-3 & Sunmylng Sesvlces Vartous
Mechanical Parts, Supplles & Service
Offtca Supplles
Eledrtcal Parts & Supplies
Fueling Dfstrlcl Vehlclea at Local Gas Stations
Engineering Sesvlces -Air Quality
Pump Parts & Supplles
water Use
Fire Exlf ngufshera
lab Parts & Supplies
Analysis Wastewater, Industrial wastewater & Blosollds
Comp188SOr Repair & Malnt. Service and Valves
Computer Malnt. Agreement
Consulting & Lab Seivlces-Assay Pilot Project
E!ectrfcal Supplies
Plumbing Supplies
Engfne Supplies
Oflice Supplies
Cuatodlal Setvfcea Spec. No. 9899-0S
Eleclrfcal Parts & Supplfes
Crane Repairs
Malnt. Agreement -Cen Gen Wafer Softener System
Anionic Polymer Spec. No. 9788-18
Lab Supplies
Container Rentals
Membemhlp -Calif. water Environment Assoc.
Paga2af8
EXHIBIT&
10/18'2004
Clalmm Paid From 09/11J04 t.o 09130/04
Warrant No.
85273
85274
85275
85278
86277
85278
85279
65280
65281
85282
85283
85284
65285
85288
85287
65288
65289
85290
65291
65292
85293
85294
85295
85298
85297
85298
85299
85300
85301
85302
85303
85304
85305
85308
85307
85308
65309
85310
65311
85312
85313
85314
86316
85318
85317
85318
85319
85320
Vendor
David's Tree Service
Del Mar Analytlcal
Delta Contracting Corp.
Dunn-Edwards Corporation
OHL Express (USA), Inc.
E. Sam Jones Distributors, Inc.
Easy Frame Sign Company, Inc.
Elect Air
Eleclra-Bond, Inc.
Employee Benefits Speclallsts, Inc.
Employers Group
Employers Group
Employment Development Dept.
Environmental Control Systems & Products
Environmental Resource Asaoclatlon
Environmental Resource Center
Eqapac
Excel Door & Gate Company, Inc.
Excel Partnership, Inc.
ETISystems
FedEx Corporation
Fisher Scfenflflc Company, L.L.C.
Fluor Enterprfses, Inc.
Forensic Analyllcal Speclallles
Fountain Valley Paints, Inc.
Frasco Profiles
Fred C. Gfibert Co.
Fuller Truck Aa:essor1es
G. E. Supply
Ganahl Lumber Company
George T. Hall
Gerhaldfs, Inc.
Getlnge castle
Glerflch-Mlfchell, Inc.
Goldenwest V\lfndaw Service
Grainger, Inc.
Graybar Electrtc Company
Guarantee Records Management
Hach c/o Ponton lnduslrles
Harold Primrose Ice
Harrington lnduatrfal Plastlcs, Inc.
Hm Brothers
H!IU, Inc.
Hoerblger Service, Inc.
Home Depot
Hub Auto Supply
lnduslrial Distribution Group
lnduslrtal Metal Supply
H:\depl\fln\EXCEL.cla\220\APSHARE\C!alma Paid Repo!ftOH41Clalma Paid Report -093004 XII
flnl210llc
Amount
280.00
188.00
8,314.00
731.77
13.42
8.82
484.88
38.24
2,472.87
803.05
3,800.00
3,890.78
5,110.00
3,880.00
1,527.79
1,448.00
954.10
890.50
895.00
4,809.08
32.82
13,228.48
3,718.43
30.00
338.84
271.00
138.20
2,088.78
24.79
120.73
172.88
814.30
8,384.42
3,229.07
3,120.00
2,039.20
350.55
287.54
777.93
74.00
90.14
17,841.85
883.56
804.87
751.08
218.85
1,880.39
33.07
Description
Tree Malnt. Service
Analysis of Blasollds and Wsstswatar
Replacement of (13) Door Sets at Pit 2
Paint Supplies
Freight Services
Electrical Supplles
Printing -Neighborhood Construction Meeting Signs
Electrfcal Parts & Supplies
Repairs & Maintenance Servlcas
Relmbumed Prepaid Employee Medlcal & Dependent Csre
Prof. Serv. -Succession Planning, career Development & Customize Model Creation
Membership
State Unemployment Tax
Chemical/Odor Neutralizer for Cske Handllng Faclllty at Pit. 1
lab Supplies
Training Registration
Hydrochloric Acid
Door Repa!m • Grit Bin Roll-Up Door at Pit. 2
Training Reglstmtlon
On-81te Transformer Testing
Freight Services
Lab Parts & Supplies
Engineering Servlcas J-84 & SP-81
Asbestos Analyses & Microscopy
Paint Supplies
Human Resources Background Checking
Small Tools
Truck Parts & Supplies
Electrlcal Parts & Supplies
Lumber/Hardware
Valve & Regulator
Instrument Repairs & Malnt. Service
Lab Parts & Supplles
Mechanical Parts & Supplies
Wndaw Cleanlng Service -Spec. #890015
Electrical Parts & Supplies
E!ecbical Parts & Supplies
Off-Site Records Storage
Lab Parts & Supplies
Ice For Samples
Mechanical Parts & Supplies
Chemicals -Odor & Conoslon Control -Newport Trunkllne
Mechanlcal Parts & SUpplles
Valves
Misc. Repair & Maintenance Material
Vehicle Parts & Supplies
Mechanical Parts. Supplies, Tools & Paint
Metal
Page3of8
EXHIBIT&
10/1812004
Clalma Pafd From 09111/04 tD 09130104
Warrant No.
85321
65322
85323
85324
85325
85328
85327
65328
85329
85330
85331
85332
85333
65334
85335
85338
85337
85338
65339
85340
85341
85342
85343
85344
85345
85348
85347
65348
85349
85350
85351
85352
85353
65354
85355
85356
65357
85358
85359
85380
65381
85362
65383
65364
85385
85386
85387
85388
Vendor
Information Handling Services
Inorganic Ventures, Inc.
Insight Investments
lnleqGroup
Interstate Battsrtea of C81 Coast
Irvine Ranch water Dfstrfcl
lsco, Inc.
J & B Auto Parts
J.G. Tucker and Son, Inc.
Jaeger Products, Inc.
Jensen Instrument Co.
Johnson & Assocta!ea, L.L.C.
JPMorgan Chase Bank
Kelly Paper
Kfon:e, Inc.
Lab Support
LaMotte Company
Lee & Ro, Inc.
Living Leadenshlp
Luc:crs Gounnet Foods, Inc.
LC Resourr.es
LINJER
Maintenance Technology Corp
Mandie Motons
Mayer, Brown, Rawe & Maw, L.L.P.
McCrometar, Inc.
McMaster-carr Supply Co.
Medlin Controls Co.
Mesa Laboratortes, Inc.
Michael Asner Consultlng
Mission Unlfonn Service
MJK Construction
National Plant Services, Inc.
National Semlnans Group
Neal Supply Co.
Nlnyo & Moore Corporate Accountfng
Nu-Way Laser Engraving
NAFA, Inc.
NCMA
NRDC Publications Department
0 C Tanner RecognHlon Company
Omnlmark Instrument Corp
The Orange County Register
Orange Fluid System Technologles, Inc.
Oxygen Service Company
OCB Reprographlca
01 Analyflcal
P.L. Hawn Company, Inc.
H:\depl\fln\EXCEL.cla\220\APSHARE\Clalml Paid Reporft03-04\Clalma Paid Report -093004.xi.
flnl210Jlc
Amount
2,495.00
288.75
3,313.98
4,474.82
819.87
38.02
4,247.25
33.58
2,413.80
8,454.58
2,189.27
4,500.00
11,183.00
103.41
17,838.01
2,303.25
41.08
18,595.04
2,457.00
305.82
1, 175.00
4,898.98
142.83
250.00
5,000.00
2,833.91
3,893.23
1,785.23
841.00
9,433.74
1,823.01
18,693.87
3,387.50
790.00
81.46
1,302.00
507.65
830.00
100.00
5.00
1,750.32
598.95
95.94
419.98
2,493.28
182.11
814.18
1,508.77
Deecrfptlon
Software Support -NFPA Data Pages
lab Parts & Supplies
Tax liability
Profeaslonal Services -Contract Management System
Battertes for Vehlcles & Carls
Ws!arUse
Rechargeable Battertes & Base Assembly for Sampler
Auto Parts & Supplies
Speclalty Gases
Dewaterlng Scrubbens 10' Diameter Packfng Support
Instrument Parts & Supplies
Prufeulonal Services -2004 Market Survey
Yearty Administration Fee for Serles 1993 Refunding Certificates of Participation
Paper
Temporary Employment Services
Temporary Employment Services
Lab Parts & Supplies
Professional Services P2-47 & 5-54
Training Regfalratlon
Meeting Expense
Training Registration
Professional Service -DART MO 9-22-89
Repair & Maintenance Supplies
Towing Services
Profeaslonal Services -Legislative AdvocaJ;/
Instrument Parts & Supplies
Mechanical Parts, Tools and Repair & Maintenance Supplies
Instrument Supplies
Repair, Calibrate & Install Heating Unit
Profea&fonal Services J-40-7
Unlfonn Rentals
Underground Storage Tank Remediation at Blower BuUdtng, Pit. 1
Vacuum Truck Services
Training Registration
Plumbing Supplies
Professional Servlc:ea -Materials Testing, lnspecllon & Geotechnlcal Engrg.
Stael Tags
Membe1Shlp
Membel8hlp
Publication
Employee Service Awards Program
Instrument Repairs & Cslfbratfon
Notlcea&Ms
Plumblng Parts & Supplies
Specialty Gases
Printing Service -MO 1128/00
lab Supplies
Eleclr1cal Supplies
Page4of8
EXHIBIT&
10/1813J04
Claims Paid From 0911ll04 to 09130104
Warrant No.
85389
85370
85371
65372
85373
65374
85375
85378
85377
85378
65379
65380
85381
85382
65383
85384
85385
85388
85387
85388
65389
85390
65391
85392
85393
85394
85395
85398
85397
85398
85399
85400
85401
85402
85403
85404
85405
85408
85407
85408
85409
85410
85411
85412
85413
85414
85415
85418
Vendor
Paclffc Bell Internet Services
Pacific Mechanical Supply
Parker Supply Company
Pan10na, Inc.
Paul Pitt
Pen Valve
Polydyne, Inc.
Power Design
Power Measurement Ltd.
Precon Products
Profit Techniques, Inc.
Project Management Institute
Public Tl888Ury Institute
Pulse, Inc.
Pumping Solutions, Inc.
PCG Industries
PVF Sales, Inc.
Q Afr -Cslff. Div. Pump Engineering
R & R Instrumentation, Inc.
R. L. Abbott & Associates
Rainbow Disposal Co.
Rellastar Bankers Security Life Ins.
RemedyTemp, Inc.
Resource Building Materials
Retrofit Parts & Components, Inc.
Rockwell Engineering & Equipment Co.
Roto Rooter-N.O.C.#11
RBF Consulting
RD Instruments
RMS Engineering & Design, Inc.
Schwing America, Inc.
Science Applications lntt.
Seaventuras
Skalar, Inc.
SklllPath Seminars
Sloan Electric Company
Smardan Supply Company
Smith Pipe & Supply, Inc.
Southam Csllfomla Edison
Sparkletfs
Sparling Inst., Inc.
Spex Certlpmp, Inc.
Summit Steel
Sunset Ford
SunsetlndusfrfalParts
Super Chem Corporation
Technical Service Group, Inc.
SCAP
H:\dept\fln\EXCEL.cb\220\APSHARE\Clatm. Paid ReporNJ3-04'Clalm8 Paid Report -093004.xta
fm1210llc
Amount
328.88
189.84
3,783.84
23,422.88
4,888.70
895.28
23,843.49
8,490.70
1,818.25
588.17
437.50
154.00
47.50
1,725.82
4,779.57
1,870.00
475.88
129.71
1,458.01
8,000.00
2,818.57
10,948.89
1,700.22
245.27
135.34
8,707.14
748.50
18,723.80
1,424.28
17,310.00
2,190.50
11,732.45
3,700.00
452.33
189.00
16,488.78
41.38
320.20
34.83
1,553.39
2,811.82
144.02
2,038.87
11.58
459.12
1,209.55
1,381.80
30.00
Description
Internet Service
Plumbing Supplies
Mechanical Parts & Supplies
Engineering Services J-42
Engineering Services SP-74
Plumbing Parts & SUpplles
Cstfonlc Polymer MO 3-11-92
Electrfcal SUpplies
Instrument Repafrs & Malnt. Service
Concrete
Professional SeNlces -O & M Leadership Coaching
Membership
Publlcatlon
Computar Hardware/Software
Pumps & Pump Supplles
Repair & Maintenance Services
Plumblng Parts & Supplies
Pump Supplies
Instrument Supplles
Kem County Blosollds Consulting SeNlces
Tl88h Removal
Employee Life Ins. Premium, Short-Term Dlsablltty & Cancer Ina. Payroll Deductions
Temporary Employment Services
Cement
Mechanlcal Parts & Supplies
Pump
CCTV, Inspection & Unclogglng of Sewer Lateral&
Engineering Services 7-40, 7-38 & 7-22-1
Lab Parts & Supplies
Engfneering Services -2004-05 Facllltles Engineering Program
Pump Supplies
Professional Services -Support to Deploy Coastal Monftaring Buoy
Ocean Monitoring Vessel
Lab Supplies
Training Registration
Motor Repairs
Plumblng Parts & Supplies
Plumbing Parts & Supplies
Power
Drfnklng Water/Cooler Rentals
Flow Meler
Lab Supplles
Metal
Auto Parts & Service
Mechanlcal Supplles
Chemlcals
SCADA System VAX Service Agreement
Envlronmental Asaessment & Environment Science Lab Divisions Meetlng Registration
Page5af8
EXHIBIT&
10l18l2004
Claln Paid From 09111/04 fD 09130104
WarmntNo.
85417
85418
85419
85420
85421
85422
85423
85424
85425
85428
85427
85428
85429
85430
85431
85432
85433
65434
85435
85438
85437
85438
85439
85440
85441
85442
85443
85444
85445
85448
85447
85448
85449
85450
85451
85452
85453
85454
85455
85458
85457
85458
85459
85480
85481
85482
85483
85484
Vendor
Te!edyne Electronlcs Tech.
Tenn!nlx lntematfonal
Tetra Design, Inc.
Tetra Tech, Inc.
Thompson lndustrlal Supply, Inc.
ThyssenKrupp Elevator Corporation
Time Motion Tools
Tony's Lock & Safe Service & Sales
Townsend Publlc Affairs
Traffic Control Service, Inc.
Southam C&llfomla Trane Service
Tri-Slate Seminar On-the-River
Tropical Plaza Nursery, Inc.
Truck & Auto Supply, Inc.
Tustin Unified School District
Voided Check
Union Bank of Calff'omla
UnHed Parcel Service
US Equipment Co., Inc.
Vapex, Inc.
Varian Aaaoclates, Inc.
Verizon C811fomla
Verne's Plumbing
Vocam USA. L.L.C.
VWR Scientific Products
The Wsckenhut Corporation
Water 3 Engineering, Inc.
Waxle Sanitary Supply
Welding Training Solutions, Inc.
West Coast Switchgear, Inc.
Western Slates Control
WEF -Registration Dept.
WEF
Xerox Corporation
Yokogawa Corp. of Amertca
zee Medical
C811fomla Bank & Trust
LH Englneerfng Co.
Orange Community Bank
Paulus Engineering, Inc.
ASTD-OC -American Society for Training
Deon M. carrtco
James E. Colston
lngrtd G. Hellebrand
Deirdre E. Hunter
Penny M. Kyle
Mlchael D. Moore
Edmund L. Pendleton
H:\depl\fln\EXCElcla\220\APSHARE\Clalms Paid Repcm\03-Melalnw Paid Report -093004.xta
fml210Jlc
Amount
94.89
3,010.00
18,942.59
7,423.72
3,433.44
2,235.50
187.24
24.25
5,000.00
588.77
85.38
550.00
1,015.00
153.84
3,974.00
16,385.18
1,241.91
1,441.80
3,221.00
780.85
3,734.28
475.00
801.48
2,303.12
19,832.10
8,503.88
431.77
5,400.00
12,880.00
787.38
780.00
531.00
848.59
425.84
457.53
2,952.00
14,480.89
21,732.0D
11,743.82
300.00
58.00
459.55
1,550.05
381.71
150.00
188.00
92.00
Ducrlpllan
Instrument Paris & Supplles
Pest Control
Professional Services J-88
Pn>fesslonal Services 11-22
Mechanical Supplies
Elevator Maintenance
Tools
Locks& Keya
Leglalatlve & Executive Advocate for Grant Funding
Traffic Safety Equipment Rental
Eleclrtcal Equipment Service Contract
Training Registration
Contract Groundskeeplng MO 5-11-94
Automotive Supplies
Construction -Relocation of Block Wall On OCSD Easement to Allow Manhole Access
2003 Annual Administrative Fees
Parcel Servlcea
Fiiters
Instrument Parts & Supplies
Instrument Paris & Supplies
Telephone Services
Service Contract -Testing & Cert. Backflow Oevlcea at Pl!s. 1 & 2 & Pump Sta.
Video
Lab Supplies
Security Guards
Engineering Services J-87
Janltortal Supplies
Training Registration
Electrfcal Repair & Maintenance -Vacuum Breakers & Shutters
Electrlcal Parts & Supplies
Training Registration
Membership -water Environment Federation
Fax & Copier Leases, Supplies, & Maintenance
Instrument Parts & Supplies
Safety Supplies
Construction J-33-1A. Retention
Construction 5-54
Consfrudlon P2-82, Retention
Construction 5-22-R1
Training Registration
MeeHng/Tralnlng Expense Reimbursement
Meeting/Training Expense Reimbursement
Meetlng!Tralnlng Expense Reimbursement
Meeting/Training Expense Reimbursement
Meeting/Training Expense Reimbursement
Meetfng/Tralnfng Expense Reimbursement
Meeting/Training Expense Reimbursement
Page8ot8
EXHIBIT&
10l18121D04
Clalme Paid From 09118/04 to 09130104
Warrant No.
85466
66488
66467
65488
85489
85470
65471
85472
65473
86474
65475
65478
85477
85478
65479
85480
65481
65482
86483
65484
85485
85486
65487
65488
66489
65490
85491
65492
65493
65494
65495
85498
85497
66498
85499
85500
65501
85502
85503
65504
85505
85508
65507
85508
85509
85510
85511
85512
Vendor
Rory Rea
Roya Sohanald
Simon L. Wstson
Michael I. Zedek
CCAC -City Clerks' Association of CA
Orange County Sanitation Dlstrfcl
Thompson, Robert
AMSA
City of Fountain Valley
MJK Construction
Sancon Engineering, Inc.
Synagro Technologies, Inc.
Waste Markets Corp.
South Coast Air Quallty Management Dist
AccuStandard
Airgas Safety, Inc.
Awards & Trophies Company
ASTD-OC -American Society for Training
American Telephone & Telegraph Corp.
C811fomla Rebuild America Coalition
Communications Perfonnanc:e Group, Inc.
Consumers Pipe & Supply Co.
County of Orange -Auditor Controller
County of Orange -AudHor Controller
CA-NV Section, AWNA
CR&R, Inc.
CWEA Membership
DAC
FedEx Corporation
Fisher Scfentlflc Company, L.L.C.
Franchise Tax Board
Fry's Electronics
Full Spectrum Analytics
Hamlet USA, Inc.
City of Huntlngtan Beach
lndustrtal Threaded Products, Inc.
Konnle K. Gallery
McJunldn Corporation
McMaster-Carr Supply Co.
Motion Industries, Inc. CA 55
National Plant Services, Inc.
National Technology Transfer, Inc.
New Horizons CLC of Santa Ana
City of Newport Beach
Pacfflc Mechanfcal Supply
Partners Consulting Services
Prodata
Public Resoun:es Advisory Group
H:\depl\fln\EXCEL.dla\220\APSHARE\Clalma Paid Repo~lalma Paid Report • 093004.xla
flnl210Jlc
Amount
240.00
150.00
147.13
212.80
200.00
803.09
1,124.87
29,089.00
28,506.32
89,859.17
27,150.00
528,549.99
35,035.20
81,888.58
50.28
2,111.58
52.13
300.00
91.73
5,000.00
21,749.82
138.53
1,221.00
847.50
450.00
315.00
194.00
5,500.00
113.31
2,721.34
50.00
205.23
800.00
288.83
15,285.40
217.61
80.88
158.17
3,243.90
401.38
900.00
2,249.90
1,675.00
25.67
232.23
19,880.00
295.00
7,500.00
Description
MeetlngfTralnfng Expense Relmburaemant
Meetfng/Traln!ng Expense Relmburaement
Meetfng/Tmlnlng Expense Reimbursement
MeeflngfTmlnlng Expense Reimbursement
Admlnlstmtlve Services Division Meeting Registration
Petty Cash Refmb.
Employee Computer Loan Program
Membership ( Asaoc. of Metropolitan Sewerage Agencies)
Water Use
Underground Storage Tank Remediation at Blower Building, Pit. 1
Construction -Manhole Rehabilitation Program
Residuals Removal MO 3-29-95
Malnt. Agraement -Grit & Scl8enlnga Removal & Digester Bed Mart. Removal
Pennlt Fees -Annual Emission, Operation & Misc. Fees
Lab Parts & Supplies
Safety Supplies
Plaques & Awanis
Training Registration
Telephone Service
Membership
Prof. Serva. -Emergency Response Plan & Hazardous Energy Control Procedures
Plumblng Supplfes
Encroachment Pennft
EncroachmantPennH
Employee Development/Tmlnlng Division Meeting Registration
Container Rentals
Membership -C81lf. Water Environment Assoc.
Dlsclosure & Dissemination Services for 1992, 1993, 2000 A & 8, and 2003 Bond Issues
Freight Services
Lab Supplies
\Nage Garnishment
Computer Supplfes
Instrument Repairs
Plumblng Parts & Supplies
water Use
Mechanical Parts & Supplies
Frames
Freight Services
Tools
Repairs & Ma!nfananc:e Matartals
Vacuum Truck Services
CClV Sewerl!ne Inspection
Training Reglstmtlon
Water Use
Plumbing Supplies
FIS On-Site Support -One World XE Migration Project
Software Malnt.
Financial Advisory Services
Page7 ot8
EXHIBITS
10/18'2004
Warrant No.
85513
85514
85515
85518
85517
85518
85519
85520
85521
85522
85523
85524
85525
85528
85527
85528
85529
85530
85531
85532
85533
85534
85535
85538
85537
85538
85539
85540
85541
85542
85543
65544
65545
85548
Vendor
Reatek Corp.
City of Seal Beach Finance Dept.
Shureluck Sales & Engfneerfng
Smardan Supply Company -Fountafn Valley
Snap-On Tools
Southam catlfomla Edison
Southam Counties Lubricants
SUmmft Steel
Super Chem Corporatfon
SBC
Thompson lndustrfal Supply, Inc.
Tfme Wamer Communications
The Unisource Corporatfon
United Parcel Service
Verizon Csllfomla
VWR Scientific Products Corporatfon
YCA
Aguilar, Rosa
Aquarium of the Pacfflc
County of Orange -Auditor Controller
Myer, John & Dell
Paul or Yolanda lewanskl
United Slates Treasury
United States Treasury
Court Trustee
Employee Benefits Speclallsts, Inc.
Franchise Tax Board
Internal Revenue Service
Internal Revenue Service
Natfonal Bond & Trust
OCEA
United Way
U.S Postal Servlce(AMS-TMS)
Government Finance Offfcers Assoclatfon
Total AccountB Payable -WarrantB
Pavroll Dllbu•mentB
34920 -35248 Employee Paychecks
35247 -35339 Employee Paychecks
102977 -103511 Direct Deposit Statements
Total Payroll Dlsburumenlll
Wire T11gfer Paymenlll
OCSD Payroll Taxes & Contributions
U.S. Bank
Total Wire Tra•fer Paymenta
Total crarms Pafd G9111J04 -09/30J04
Claf1111 Paid From 09111/04 to 09130114
Amount
200.00
238.88
685.58
114.34
55.24
18.00
1,298.34
1,128.09
487.83
888.97
7,782.05
40.47
9,093.02
73.87
807.04
22.05
1,200.00
1,450.00
380.00
75.00
3,000.00
1,003.95
20,990.44
6,888.30
89.12
9,792.38
50.00
300.00
200.00
2,485.38
598.81
245.00
5,000.00
526.00 s 10,441,997 .35
$ 80,771.88
159,285.34
1,079,894.38 s 1.299.931.38
s 815,572.88
178,210.54 s 993, 783.22
s 12,735,711.95
O..crfptlon
Training Regla!ratlon
water Use
Mechanical Parts & Supplfes
Mechanical Parts & Supplfes
Tools
Power
Engine Oil
Metal
Chem lea ls
Telephone Services
Mechanical Parts & Supplies
Cable Services
Office Supplles
Parcel Services
Telephone Services
labSupplles
Training Registration
Employee Computer loan Program
Refmbursabla Employee Activity Expense
Admfnlstratfve Prucessfng Fee for Supplemenlal Sewer Fee Adjustments/Csncellatlons
Employee Computer loan Program
User Fee Refund Regarding Septic Tanks
Interest on Arbitrage Rebata Payment -Serles 1992 COPS
Interest on Arbllrqe Rebate Payment -Sertes 2000 A, COPS
Wage Garnishment
Reimbursed Prapald Employee Medlcal & Dependent Cera
Wage Gamlshmenl
Wage Garnishment
Wage Gamlshment
U.S. Savings Bonda Payroll Deductions
Dues Deduction
Employee Contributions
Postage
Review Fee -Consideration of 2004 Dlstfngulshed Budget Presentation Award
Interim Paychecks (Retro Payments, Tennlnatlon & Corrections)
Blweekly Payroll 09128/04
Blweekly Payroll 09129/04
Blwaekly Payroll 09129/04
September Interest Payment for Serles 2000, A & B Certificates of Partlcfpatfon
H:\depl\fin\EXCEL.ctla\220\APSHARE\Clalms Paid Re~lalma Paid Report -093004.xla
flnl21Dllc Page8af8
EXHIBITB
1Dl18l2004
BOARD OF DIRECTORS Meeting Date To Bel. of Dir.
10/27/04
AGENDA REPORT Item Number Item Nu mbe r
9(a)
Orange County Sanitation District
FROM: Gary Streed , Director of Finance
Originator: Michael D . White, Risk Manager
SUBJECT: SUMMONS & COMPLAINT RE ORANGE COUNTY TRANSPORTATION
AUTHORITY V . ORANGE COUNTY SANITATION DISTRICT, ET AL.
GENERAL MANAGER'S RECOMMENDATION
Receive and file Summons and Complaint, Orange County T ransportation Authority v .
Orange County Sanitation District, et al , Orange County Superior Court Case
No. 04CC09849, re Complaint in Eminent Domain ; and authorize the General Counsel
to appear and defend the interests of the District.
SUMMARY
Please see attached memo dated 10/19/04 from General Counsel.
BUDGET IMPACT
D Th is item has been budgeted .
D This item has been budgeted , but there are insufficient funds .
D This item has not been budgeted .
D Not appl icable (information item)
ADDITIONAL INFORMATION
ALTERNATIVES
CEQA FINDINGS
ATTACHMENTS
Memo from General Counsel.
GGS :MW:BG
Page 1
.. ,. LAW OFFICES OF
~ WOODRUFF, SPRADLIN & SMART
A PROFESSIONAL CORPORATION
MEMORANDUM
TO: Chair and Members of Board of Directors
Orange County Sanitation District
FROM: General Counsel
DATE: October 19, 2004
RE: Eminent Domain Proceedings -Summons and Complaint
Orange County Transportation Authority v. Amerisourcebergen
Corporation, Orange County Sanitation District, et al.
Orange County Superior Court Case No. 04CC09849
The above-referenced matter of litigation was served on the District on October 11,
2004. The Orange County Transportation Authority ("OCTA") has filed this condemnation
proceeding to acquire certain interests in real property for the expansion of the Garden Grove
Freeway (State Route 22 [SR-22]), High Occupancy Vehicle Lane Design-Build Project. The
District has been named as a party to the proceeding by OCTA as a precautionary matter,
apparently because of its sewer line facilities in the vicinity of the Project.
The District's Engineering Department will be making contact with OCTA to ascertain
exactly what, if any, impacts this acquisition, and more notably the construction, would have on
any District facilities. If in fact the District is to incur any expense, or suffer adverse
consequences as a result of the acquisition, the District would then immediately endeavor to
negotiate the fair compensation from OCTA for any costs incurred. If, on the other hand, the
District is not adversely impacted, there should be no significant participation required by the
District in the proceedings.
The Office of General Counsel is attempting to secure an agreement with OCTA to delay
the need to appear and defend this action until such time as the District's Engineering
Department verifies the impacts and attempts to resolve any issues, including cost. If no
resolution is possible, the Office of General Counsel will recommend Special Counsel to appear
and defend, as necessary, the interests of the District with respect to this litigation.
TLW:pj
cc: Mr. B.P. Anderson
Mr. R.P. Ghirelli
Mr. G.G. Streed
Mr. D.A. Ludwin
Mr. M. White
Ms. P. Kyle
Enda
THOMAS L. WOODRUFF
GENERAL COUNSEL
-.
BOARD OF DIRECTORS Mee ting Date To Bel. of Di r.
10/27/04
AGENDA REPORT Item Number Item Nu mber
9 (b)
Orang e County Sanitation District
FROM: Gary Streed , Director of Finance
Originator: Michael D . White, Risk Manager
SUBJECT: SUMMONS & COMPLAINT RE SOUTHERN CALIFORNIA EDISON
COMPANY V . ORANGE COUNTY SANITATION DISTRICT AND STEVE
P . RADOS, INC.
GENERAL MAN AGER'S RECOMMENDATION
Receive and file Summons and Complaint, Southern California Edison Company v .
Orange County Sanitation District and Steve P . Rados, Inc., Orange County Superior
Court Case No. 04WL05251 , re Complaint for Damages in connection with the Bushard
Trunk Sewer Rehabilitation , Job No. 1-2-4; refer to Contractor and Contractor's Insurer
to defend and indemnify the District; and authorize the General Counsel to appear and
defend the interests of the District in the event of Contractor's failure to appear and
respond to the Complaint within the time required .
SUMMARY
Please see attached memo dated 10/19/04 from General Counsel.
BUDGET IMPAC T
0 This item has been budgeted .
0 This item has been budgeted , but there are insufficient funds .
0 This item has not been budgeted.
0 Not applicable (information item)
ADDITIONAL INFORMAT ION
ALTERNATIVES
CEQA FINDINGS
ATTACHMENTS
Memo from General Counsel.
GGS:MW:BG
Pa g e 1
LAW OFFICES OF
WOODRUFF, SPRADLIN & SMART
A PROFESSIONAL CORPORATION
MEMORANDUM
TO: Chair and Members of Board of Directors
Orange County Sanitation District
FROM: General Counsel
DATE: October 19, 2004
RE: Southern California Edison v. Orange County Sanitation
District, Steve P. Rados, Inc., OCSC Case No. 04WL05251
A summons and complaint was served on the District on October 13, 2004,
alleging property damage to Edison's facilities, arising out of Contract 1-2-4, Bushard
Trunk Sewer Rehabilitation.
The District has a construction contract with Steve P. Rados, Inc., for which the
District is entitled to and will require Rados to secure counsel to represent, defend, and
indemnify the District.
In the event the Contractor and its insurer fail to timely appear and respond to the
complaint, the District will need to do so on its own. In such event, this matter will be
referred to the General Counsel to represent the interests of the District until such time
as the Contractor provides the defense. Any costs and fees incurred will be charged
back directly to the Contractor.
TLW:pj
cc: Mr. B.P. Anderson
Mr. G.G. Streed
Mr. D.A. Ludwin
Mr. M. White
Ms. P. Kyle
Enda
THOMAS L. WOODRUFF
GENERAL COUNSEL
':,·, ','
! :·· :~«· l ~
PROJEctiPlfAse .
Phase 1 -Project Development 16,182.00 16,182.00
Phase 2 -Preliminary Design 71,000.00 73,026.00
Phase 3 -Design 1,615,022.00 1,788,790.00
Phase 4 -Construction 2,831,093.00 6, 160,000.00
Phase 5 -Commlssionina 125,035.00 106,007.00
Phase 6 -Close-Out 31,258.00 30,258.00
Phase 7 -Contingency 323,095.00 454,210.00
PROJECT TOTAL 5,012,685.00 $ 8,628,473 $
!Reimbursable Costs
PROJECT NET $ 5,012,685 $ 8,628,473 $
Design PSA $ 237,790 $ 868,253 s
Construction Contract $ 5,659,290 $ 5,659,290 $
EOMS: 003781325
BUDGET INFORMATION TABLE
Rehabilitation of 11 A11 Street Pump Station
CONTRACT NO. 5-52
$ 16,182 $ 16,182
$ 73,026 $ 73,026 $
$ 1,788,790 • $ 1,788,790
$ 6,160,000 ... $ 6,160,000 $
$ 106,007 $ 106,007
$ 30,258 $ 30,258
$ 454,210 ,' $ 454,210
!
$ 8,628,473 "1: $ 8,628,473 $
j:;d
8,628,473 3· $ 8,628,473 $
PSA/Contract
-$ 868,253 ::i::. $ 868,253 $
-$ 5,659,290 :1~ $ 5,659,290 $
$ 16,182 $ 16, 182 100%
-$ 73,026 $ 128,473 176%
$ 1,788,790 $ 1,826,133 102%
-$ 6,160,000 $ 3,911 0%
$ 106,007 $ 14,425 14%
$ 30,258 0%
$ 454,210 0%
$ 8,628,473 $ 1,989, 123 23%
8,628,473 $ 1,989,123 23%
-$ 868,253 $ 801,628 92%
-$ 5,659,290 $ -0%
MINUTES OF STEERING COMMITTEE MEETING
Wednesday, September 22, 2004
A meeting of the Steering Committee of the Orange County Sanitation District was
held on Wednesday, September 22, 2004 at 5 p.m., in the District's Administrative
Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS:
Directors Present:
Steve Anderson, Chair
Jim Ferryman, Vice Chair
Carolyn Cavecche, Chair, OMTS Committee
Roy Moore, Chairman, FAHR Committee
Jim Silva, County Supervisor
Shirley McCracken, Past Board Chair
Tod Ridgeway, Director
Directors Absent:
Brian Donahue, Chairman, PDC Committee
OTHERS PRESENT:
Brad Hogin, General Counsel
Chris Townsend
Scott Baugh
Eric Sapirstein
John Freshman
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
STAFF PRESENT:
Bob Ghirelli, Acting GM & Director of Technical
Services
Bob Ooten, Director of Operations and
Maintenance
Lisa Tomko, Director of Human Resources
Carol Beekman, Director of Communications and
Administrative Services
Gail Garrett, Committee Secretary
Layne Baroldi, Legal & Regulatory Affairs
Liaison
Jim Colston, Legal & Regulatory Affairs
Liaison
Jim Herberg, Engineering Manager
Sam Mowbray, Laboratory Manager
Ed Torres, Engineering Manager
Sonja Wassgren, Principal Public
Information Specialist
Simon Watson, Maintenance Manager
There were no comments by any member of the public.
(4) RECEIVE. FILE AND APPROVE MINUTES OF PREVIOUS MEETING
The minutes of the August 25, 2004 Steering Committee meeting were approved as drafted.
Minutes of the Steering Committee
Page2
September 22, 2004
(5) REPORT OF THE COMMITTEE CHAIR
Committee Chair Steve Anderson reported on several issues, as follows:
A. The Advanced Water Purification Facility (AWPF) groundbreaking ceremony was
held this past Monday. The event attracted more than 150 elected officials,
community leaders and industry leaders from around the state and country. The
Dedication Plaque and the rendering of what the finished facility will look like are
displayed in the Board room tonight.
B. There will be a special GWRS Visitors Center workshop held at 5:30 p.m. Monday,
September 27 in the OCWD Board room. The meeting is for Directors and alternates
serving on the GWRS Steering Committee, but is open to any Director who would like
to sit in and listen.
C. O.C. Supervisor Jim Silva, Mayor Tod Ridgeway (Newport Beach) and Carol
Beekman, Director Of Communications and Administrative Services recently traveled
to Washington D.C. to lobby for federal dollars for the construction of secondary
treatment facilities.
D. Director Anderson announced Mr. Harvey Hunt of Carollo Engineers passed away
this past Monday. Apparently, he had been in poor health for about 1-1/2 years. he
was considered one of the "foundations" of the District. The Board meeting will be
adjourned in his memory.
(6) REPORT OF THE GENERAL MANAGER
Acting General Manager Bob Ghirelli reported on several issues, as follows:
A. Mr. Ghirelli gave an update on Blake Anderson. He should be returning to work at the
end of October.
B. The Santa Ana Regional Water Quality Control Board approved OCSD's NPDES
permit and Time Schedule Order at their public hearing this past Friday. It establishes
the schedule for OCSD to achieve compliance with secondary treatment standards.
EPA approval is expected next week, our new NPDES permit will become effective 33
days later, around the end of October.
C. Mr. Ghirelli announced that the District's vessel, Nerissa, was launched on August 31st
in the state of Washington and is currently undergoing sea trails. The delivery of the
vessel will be in the next few weeks. The vessel will be moored in Newport Harbor
and a christening ceremony is planned for November 6.
D. He reported that we are working closely with LACSD and the City of Los Angeles
through CASA on the biosolids issue in Kem County.
E. Several commercial property sites have been identified for the new Ellis Pump Station
site. A draft EIR is being prepared. Director Shirley McCracken noted that building on
commercial sites would mitigate long range problems.
F. Fred O'Brien is receiving his 30 year service award at the Board meeting tonight.
G. Mr. Ghirelli asked Bob Ooten, Director of Operations and Maintenance, to brief the
Minutes of the Steering Committee
Page3
September 22, 2004
committee members on the Labor Day spill. He outlined possible causes,
recommendations and actions taken. Director Ferryman asked whether the agency
which had drenched Edison's transformer had been contacted. District filed an
incident report with the Regional Water Board and investigations are currently
ongoing. An in depth report will be submitted to the Board within 90 days.
(7) REPORT OF GENERAL COUNSEL
General Counsel did not make a report.
(8) DISCUSSION ITEMS (Items A-D)
A. Legislative Advocacy Briefing by Consultants
The District's lobbying team who represent OCSD in Sacramento and
Washington D.C. each gave updates on legislative activities. Presentation
materials were handed out at the meeting. Scott Baugh urged staff and Directors
to work in conjunction with all Orange County cities towards establishing a policy
clarifying their needs and requirements with the California Performance Review
(CPR). Mr. Ghirelli reported that staff is looking at the CPR and evaluating how
OCSD will be impacted. Staff will have an update by next month. Director
McCracken noted that OCSD staff needs direction from the Board on this matter.
B. GVRD Oct. 21st workshop on Biosolids Planning and Options
Mr. Ghirelli informed the Steering committee that one of District's staff will be
traveling to Vancouver, British Columbia to attend a biosolids workshop.
C. The Agenda Items scheduled to be reviewed by the Board's working committees
in October were reviewed. Mr. Ooten said items 4 and 5 would not be going
forward to OMTS.
D. The agenda items scheduled to be presented to the Board at tonight's meeting
were reviewed. Director Anderson noted that all items on the agenda tonight are
consent items. There were no questions or clarifications requested.
(9) OTHER BUSINESS. COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS. IF ANY
There was no other business discussed.
(10) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(11) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND/OR STAFF REPORT
There were none.
Minutes of the Steering Committee
Page4
September 22, 2004
(12) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday, October 27, 2004 at 5 p.m.
The next Board Meeting is scheduled for Wednesday, October 27, 2004 at 7 p.m.
(13) CLOSED SESSION
The Committee convened at 6:30 p.m. in Closed Session, pursuant to Sections 54956.8,
54956.9, 54957 or 54957 .6, to discuss four items. Minutes of the Closed Session are on file
with the Board Secretary. Confidential Minutes of the Closed Session held by the Steering
Committee have been prepared in accordance with Government Code Section 54957 .2, and are
maintained by the Board Secretary in the Official Book of Confidential Minutes of Board and
Committee Closed Meetings. A report of the recommended actions will be publicly reported at
the time the approved actions become final.
At 6:50 p.m., the Committee reconvened in regular session.
(14) ADJOURNMENT
The Chair declared the meeting adjourned at 6:50 p.m.
Submitted by:
~
Gail Garrett
Steering Committee Secretary
H:\deptlagenda\Steerfng Commlttee\04\SC Minutes Form.S.doc
"
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
Orange County Sanitation District
Wednesday, October 6, 2004 -5:00 P.M.
A meeting of the Operations, Maintenance and Technical Services Committee of the Orange
County Sanitation District (OCSD) was held on October 6, 2004, in the District's Administrative
Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
OMTS Directors Present:
Anna Piercy, Vice Chair
Tod Ridgeway,
Cathy Green
Doug Davert
Tod Ridgeway
James M. Ferryman, Board Vice Chair
OMTS Directors Absent:
Carolyn Cavecche, Chair
Don Bankhead
Paul Walker
Steve Anderson, Board Chair
Staff Present:
Bob Ghirelli, Director of Technical Services
Bob Ooten, Director of Operations & Maintenance
Dave Ludwin, Director of Engineering
Penny Kyle, Committee Secretary
Mahin Talebi, Source Control Manager
Ed Torres, Environmental Compliance Services
Manager
Mark Kawamoto
Jim Herberg
Jennifer Cabral
Sonja Wassgren
Others:
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Committee Vice Chair Piercy had no report.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page2
October 6, 2004
(5) REPORT OF THE GENERAL MANAGER
Bob Ghirelli, Acting General Manager, reported that General Manager Blake Anderson will
return to work on October 18.
The Directors were advised that the annual monitoring report on the SARI line determined there
were two areas of the pipeline that had less than two feet of coverage due to soil erosion that
must be addressed before the wet weather starts. The Sanitation District, as well as the Army
Corps of Engineers, has declared this an emergency. In accordance with the District's
delegation of authority for emergencies, Mr. Ghirelli advised that staff was proceeding to obtain
services to repair those areas and ratification by the Board of Directors should take place at the
October Board meeting.
Mr. Ghirelli briefly discussed the meeting held with the Huntington Beach Convention & Visitors
Bureau, and their displeasure over image impacts caused by the spill over the Labor Day
weekend. He advised they had requested the District participate in communications programs
focusing on beach water quality in response to the spill. The issue will be placed on the
Steering Committee agenda for October.
Sonja Wassgren, Principal Public Information Specialist, reported the first meeting of the
Biosolids Advisory Committee (BAC) was held, and is comprised of 17 members. A facilitator
has been hired to ensure the process remains open and focused. The BAC would meet again
on October 11.
Jim Herberg, Engineering Manager, reported on the final two alternatives to be recommended
regarding the Ellis Avenue Pump Station. The public hearing would be held in December 2004,
and the project should be certified in March 2005.
(6) CONSENT CALENDAR ITEMS
a. The minutes of the September 1, 2004 Operations, Maintenance and Technical Services
Committee meeting were approved as drafted and ordered filed.
b. OMTS04-48 Receive and file Technical Services Monthly Report, which focuses on
regulatory, biosolids and performance, measures for the Technical
Services Department.
c. OMTS04-49 Receive and file Operations & Maintenance Monthly Report, which
focuses on compliance, financial data and performance measures for the
Operations and Maintenance Department.
d. OMTS04-50 Receive and file Information Technology Quarterly Report, which focuses
Motion:
on current performance trends and key technology business applications.
Moved, seconded and duly carried to approve the recommended actions
for items specified as 6(a) through (d) under Consent Calendar.
'.--
'
'
...
Minutes of the Operations, Maintenance
and Technical Services Committee
Page3
October 6, 2004
(7) ACTION ITEMS
a. OMTS04-51 Recommend to the Board of Directors to proceed with the first reading of
proposed Ordinance No. OCSD-25, Adopting Fats, Oils, and Grease
Control Regulations Applicable to Food Service Establishments.
MOTION: It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
(8) INFORMATIONAL ITEMS
a. OMTS04-52 Update on Research and Development Program
Ed Torres, Environmental Compliance Services Manager, provided an update on the
Operational Research Program. He reviewed the criteria for selecting projects and
those research programs recently completed or ongoing. The program is currently
under re-evaluation, and the findings would be reported back to the Committee early in
2005.
(9) REPORT OF DIRECTOR OF INFORMATION TECHNOLOGY
The Director of Information Technology was not present.
(10) REPORT OF DIRECTOR OF OPERATIONS AND MAINTENANCE
The Director of Operations and Maintenance had no report.
(11) REPORT OF DIRECTOR OF TECHNICAL SERVICES
The Director of Technical Services had no report.
(12) OTHER BUSINESS. COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS. IF
ANY
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
There were none.
(14) FUTURE MEETING DATES
The next Operations, Maintenance and Technical Services Committee meeting is scheduled for
November 3, 2004 at 5 p.m.
(15) CLOSED SESSION
There was no closed session.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page4
October 6, 2004
(16) ADJOURNMENT
The Chair declared the meeting adjourned at 6:20 p.m.
Submitted by:
Penny M. Kyle -~
Operations, M ntenance anc:r J echnical Services
Committee Secretary -
H:\dept\agenda\OMTS\2004\1004\100604 OMTS Minutes.doc
MINUTES OF PLANNING. DESIGN. AND CONSTRUCTION
COMMITTEE MEETING
Orange County Sanitation District
Thursday, October 7, 2004, at 5 p.m.
A meeting of the Planning, Design, and Construction Committee of the Orange County
Sanitation District was held on Thursday, October 7, 2004, at 5 p.m., in the District's
Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
PDC COMMllTEE MEMBERS:
Directors Present:
Brian Donahue, Chair
Alice Jempsa, Vice Chair
Alberta Christy
John Collins
Norm Eckenrode
Jim Ferryman, Board Vice Chair
Directors Absent:
Steve Anderson, Board Chair
Beth Krom
Patsy Marshall
Paul Yost
OTHERS PRESENT:
James Clark, Black & Veatch
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
STAFF PRESENT:
David Ludwin, Director of Engineering
Bob Ghirelli, Acting General Manager & Director
of Technical Services
John Linder, Construction Manager
Jim Herberg. Engineering Manager
Matt Smith, Engineering Manager
Chris Cervelone, Engineering Supervisor
Tod Haynes, Engineering Supervisor
Brian Bingman, Engineer
Hardat Khublall, Project Manager
Olga Cervantes, Principal Contracts
Administrator
Jennifer Cabral, Public Information Specialist
Daisy Covarrubias, Public Information Specialist
Committee Chair Brian Donahue did not give a report.
PDC Committee Minutes
Page2
October 7, 2004
(5) REPORT OF THE GENERAL MANAGER
Acting General Manager Bob Ghirelli reported that General Manager Blake Anderson will return
to work on October 18.
Dr. Ghirelli discussed the Huntington Beach Convention & Visitors Bureau request that the
OCSD participate in communications programs focusing on beach water quality in response to
the Labor Day weekend spill.
(6) REPORT OF THE DIRECTOR OF ENGINEERING
Director of Engineering David Ludwin asked Tod Haynes, Engineering Supervisor, to give an
update on the Bushard Project status. Mr. Ludwin briefed Committee members on the new 108"
pipe design submittal. He reported the District is assessing liquidated damages from the
Contractor. Mr. Ludwin also reported that General Counsel has been extensively involved in the
project since a claim is anticipated regarding the pipe cracking and resulting delays. Jennifer
Cabral, Public Information Specialist, mentioned that the district has received 48 homeowner
damage claims to date.
Director Alberta Christy expressed concern about delivery of faulty pipe and Mr. Haynes
explained that the new pipe would be tested under the design load prior to delivery.
Mr. Haynes mentioned that the estimate for providing a sound curtain during construction would
be over $1 million. The District will also offer to pre-inspect homes along the alignment to
document existing conditions to help resolve future claims. The Contractor has requested a
150-day time extension and staff is negotiating with them. Mr. Ludwin reported that OCSD is
hiring a scheduling consultant to help document the project to help resolve any future delay
claims.
Ms. Cabral reviewed the Communications report for the Bushard Project and indicated that the
District has not been notified of a lawsuit against OCSD by homeowners along Bushard, despite
the local Huntington Beach paper report that one had been filed. Ms. Cabral also gave an
update on the outreach efforts for the 14th and "A" Street Pump Stations in Newport Beach, and
on the Community Relations program in Tustin regarding future pipeline projects.
Hardat Khublall, Project Manager, reported on the condition of the SARI Line in the Santa Ana
River and the emergency repairs. Mr. Khublall reported that the river bed has eroded to within
1.2 feet of the top of the SARI Line in one location and within 2 feet at another location. He
reported that OCSD was working closely with the US Corps of Engineers and the County of
Orange to provide rip rap protection in these areas to prevent undermining and failure of the
pipeline in the event of high river flows during a rain event. The emergency repairs are expected
to be completed within 90 days.
Mr. Ludwin and John Linder reviewed the District's Change Order policy.
PDC Committee Minutes
Page3
October 7, 2004
Director John Collins questioned the definition of design errors vs. design omissions, and his
concern with errors being noted as omissions. Director Collins requested staff to revisit the
categories for Change Orders. Staff suggests changing the following definitions: current
"changed conditions" to "unknown conditions'; current "design change" to "staff requested design
change" and "design enhancement"; "omission" to "correctable design error"; and "error" to
"reimbursable design error"
(7) REPORT OF GENERAL COUNSEL
General Counsel did not give a report.
(8) CONSENT CALENDAR (Items a-k)
a. RECEIVE. FILE. AND APPROVE MINUTES OF PREVIOUS MEETING
MOVED, SECONDED AND DULY CARRIED TO: Receive, file, and approve draft
minutes of the September 2, 2004 Planning, Design, and Construction Committee
Meeting.
b. RECEIVE AND FILE MINUTES OF COOPERATIVE PROJECTS GRANTS COMMITTEE
MEETING
MOVED, SECONDED AND DULY CARRIED TO: Receive and file draft minutes of the
September 7, 2004 Cooperative Projects Grants Committee Meeting.
c. CHANGE ORDERS
Attached is the Monthly Change Order Report and the Report of Construction Contracts with
Potential Change Orders over Five Percent (5%). This is an information only item. Action on
change orders that require PDC Committee or Board approval will be taken separately.
There are five change orders this month for PDC Committee approval.
d. PSA AND AMENDMENT REPORT
Attached is the PSA and Amendment Report. This is an information only item. Action on
PSAs and Amendments that require PDC Committee or Board approval will be taken
separately. There were no PSAs and no Amendments approved by the General
Manager from August 20 through September 23, 2004.
e. FACILITIES ENGINEERING CONSUL TANT ACTIVITY REPORT
Attached is the Facilities Engineering Consultant Activity Report. This is an information
only item.
PDC Committee Minutes
Page4
October 7, 2004
f. SANTA ANA RIVER INTERCEPTOR RELOCATION AND PROTECTION STATUS
REPORT
Attached is the Santa Ana River Interceptor (SARI) Relocation and Protection Status
Report. This is an information only item.
g. QUARTERLY GROUNDWATER REPLENISHMENT SYSTEM (GWRS) STATUS
REPORT
Attached is the Quarterly Groundwater Replenishment System Status Report. This is an
information only item.
h. PDC04-80 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to (1) Ratify Change Order No. 1 for Anaerobic
Selector Mixing Systems, Job No. SP-74, with DenBoer Engineering and
Construction, Inc., authorizing an ·addition of $25,607 and a time
extension of 237 calendar days, increasing the total contract amount to
$470,607; and (2) Accept Anaerobic Selector Mixing Systems, Job No.
SP-74, as complete, and approve the Final Closeout Agreement.
Director Collins indicated that item No. 2, Conduit Reroute should be
classified as an error instead of a design omission.
i. PDC04-81 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to ratify Change Order No. 15 to Primary Clarifiers 16-
31 and Related Facilities, Job No. P1-37, with Margate Construction,
authorizing an addition of $67 ,937 and 143 calendar days, increasing the
total contract amount to $71,377,380.
Director Collins indicated that item No. 1, Influent Channel Gate
Modification, and item No. 7, Gallery Pipe Routing should be called errors
instead of omissions.
j. PDC04-82 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to ratify Change Order No. 4 to Warner Avenue Relief
Sewer, Contract No. 11-22, with ARB, Inc., authorizing an addition of
$47,616, increasing the total contract amount to $5,506,958.
Director Collins commented on item No. 2, Extra Trench Due to
Inaccurately Marked Utility.
k. PDC04-83 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to ratify Change Order No. 1 to Secondary Treatment
Facilities Process Upgrades at Plant No. 2, Job No. P2-4 7-3, with
Morrow-Meadows Corporation, authorizing an addition of $205,903,
increasing the total contract amount to $ 4,917 ,903.
Director Collins indicated that item No.3, Relocation of Existing Outlets should
be noted as an error instead of an omission.
PDC Committee Minutes
Page 5
October 7, 2004
9. INFORMATIONAL ITEM (Item a}
a. PDC04-84 Rehabilitation of Ellis Avenue Pump Station, Job No. 1-10.
Presentation -Jim Herberg
Jim Herberg gave an informational presentation on the six alternatives for
the Ellis Avenue Pump Station Environmental Impact Report (EIR). The
Committee commented that Alternative "A" at Reclamation Plant No. 1 ,
and Alternative "B" located in the commercial area across Ellis Avenue
from Plant No. 1 should be designated as the Preferred Alternatives in the
EIR, based on the preliminary results of the environmental study, public
acceptance, willingness of property owners to sell, life cycle costs and
technical considerations. The Committee also indicated that Alternative
"B" is favorable because it allows for preservation of land at Reclamation
Plant No. 1 for future expansion.
10. ACTION ITEMS (Items a-d}
a. PDC04-85 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to ratify Change Order No. 3 to Trickling Filter
Rehabilitation and New Clarifiers, Job No. P1-76, with J.R. Filanc
Construction Company, Inc., authorizing an addition of $123,258,
increasing the total contract amount to $33,075,853.
b. PDC04-86 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to approve Amendment No. 1 to the Professional
Services Agreement with SPEC Services, Inc. for Plant No. 1 Plant Water
VFD Replacement, Job No. SP-94, providing for additional engineering
services for an additional amount of $26,384.58, increasing the total
amount not to exceed $115,863.58.
c. PDC04-87 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to (1) Approve time extensions to Cooperative Projects
Grant Program contracts with the Cities of Anaheim (Contract Nos. 0202,
0301 and 0302) and Orange (Contract No. 0130); and (2) Approve
Orange County Sanitation District funding for Cooperative Projects for
Fiscal Year 2004-05, totaling $2,386,537, as recommended by the
Cooperative Projects Grant Committee.
d. PDC04-88 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to approve Professional Services Agreement with
Dudek & Associates, Inc. for engineering services for the Rehabilitation of
District Siphons, Contract No. 2-68, for an amount not to exceed
$987,156.
PDC Committee Minutes
Page6
October 7, 2004
(11) CLOSED SESSION
There was no closed session.
(11) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There were none.
(12) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(14) FUTURE MEETINGS DATES
The next Planning, Design, and Construction Committee Meeting is scheduled for Thursday,
November 4, 2004 at 5 p.m.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 7:20 p.m.
Submitted by:
H:\dept\agenda\PDC\PDC Minutes Fonn.doc
' -PDC COMMITTEE Meeting Date To Bd . of Dir.
10/7/2004 10/27/2004
AGENDA REPORT Item Number Item Number
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: John Falkenstein , Engineer
PDC04-80
SUBJECT: PLANT NO. 1 ANAEROBIC SELECTOR MIXING SYSTEMS
JOB NO. SP-74
GENERAL MANAGER'S RECOMMENDATION
13(b)
(1) Ratify Change Order No. 1 to Anaerobic Selector Mixing Systems, Job No . SP-74,
with DenBoer Engineering and Construction, Inc., authorizing an addition of $25 ,607
and a time extension of 237 calendar days, increasing the total contract amount to
$470,607 ; and (2) Accept Anaerobic Selector Mixing Systems, Job No . SP-74, as
complete , and approve the Final Closeout Agreement.
SUMMARY
• This contract installed five mixers in five aeration basins at Plant No. 1. The mixers
will operate without the introduction of air into the basins creating an anaerobic
(without oxygen) condition. This anaerobic system provides staff with a tool to
manage the type of microorganisms used in the secondary treatment process . This
tool will improve microbe capture, increase plant stability and provide a consistent
and improved effluent water quality for the Orange County Water District Ground
Water Replenishment Project. The project will also reduce the energy use of the
existing system .
• The plans and specifications were prepared by Cathcart, Garcia, von Langen and
the contract was awarded to DenBoer Engineering and Construction , Inc., on
April 23, 2003 .
• Change Order No . 1 includes four items of added work and 1 item for a time
extension . There are three omission items associated with this change order.
Liquidated damages on this contract are $1 ,000 per day and there are no bonus
provisions .
Contract Schedule
Contract Start Date
Original Contract Completion Date
Total Number of Change Orders to Date
Current Contract Completion Date
Actual Completion Date
Days Subject to Liquidated Damages
Revised 06/04/03
June 16, 2003
December 12, 2003
1
August 5 , 2004
August 5, 2004
0
Page 1
Change Order No. 1 Content
Item Description Amount Days Type
No.
1 Modify Mixer Support Structures $10,472 45 Omission
2 Conduit Reroute $ 2,125 0 Design Change
3 Additional Conduit and Fittings $ 9 ,546 0 Omission
4 Mixer Motor Supports $ 3,464 35 Omission
5 Contract Time Extension 0 157 Other
Total -Change Order No. 1 $25,607 237
Item 1 involves changes that were not shown on the contract drawings and were
required by the mixer manufacturer to stiffen the mixer support structures. Item 2
reroutes conduit shown on the contract drawings being routed within and across
walkways resulting in trip hazards. District safety staff required this design change .
Item 3 involves an omission in the actual length of conduit which was shorter than the
actual measured length. Item 4 resulted from the Design Consultant reviewing the
installation in the field and determined that additional support was required for each of
the 5 mixer motors. The supports were not shown on the contract drawings . Item 5
involves a time extension to this contract which was due to conflicts with another
contract ( J-33-1 A). Work specified to be performed under this contract could not be
accomplished until the other contract removed and replaced a large piece of electrical
gear.
Job Completion
This project is 100% complete .
PRIOR COMMITTEE/BOARD ACTIONS
This contract was awarded by the Board of Directors on August 28, 2002.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price
Previously Authorized Changes
This Change
Change Orders to Date
Percentage Increase to Date
Final Contract Price
BUDGET IMPACT
$ 445,000
$ 0
$ 25 ,607
$ 25,607
5 .75%
$ 470,607
i:gj This item has been budgeted . (Line Item: Section 8 -Page 67)
D This item has been budgeted , but there are insufficient funds.
D This item has not been budgeted .
D Not applicable (information item)
Revised 06/04103 Page 2
-·
ADDITIONAL INFORMATION
None
ALTERNATIVES
None
CEQA FINDINGS
This project is categorically exempt from CEQA requirements
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
JBF:lc
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1004\ltem 13(b).SP-74.doc
Revised: 06/04/03 Page3
Phase 1 -Project Oevelocment
Phase 2 -Preliminary Design
Phase 3 -Design
Phase 4 -Construction
Phase 5 -Commissioning
Phase 6 -Close-Out
Phase 7 -Contingencv
PROJECT TOTAL
!Reimbursable Costs
PROJECT NET
DesignPSA
Construction Contract
Revised 200410 27
EOMS:003779185
oRiGrNAL
AU1'Hom2ED atibGl!t ·
$ 20,000
$ 250,000
$ 110,000
$ 520,000
$
$
$
$
$ 50,000 $
$ 950,000 $
$
$ 80,000 $
$ 400,000 $
t:•'
BUDGET INFORMATION TABLE
PLANT NO. 1 ANAEROBIC SELECTOR MIXING SYSTEMS
JOB NO. SP-74
... .,; ··"·'' ·"': ;.;,
10,000 $
·-
160,000 $ 160,000 ... s..;...._ __ 1_e_.o .... oo_o-1-------1-.;......--~~--.~--....;1..:.;,5;.;;.3.;..1 +--_;s;..;;~.;.." --1
130,000 $
940,000 $ 25,607 $ 965.607 ~s __ ..;;..94.;.;.o~.o.;..oo_,._s..__ __ _.;;;;......,. ........ ..;;..._ __ __;;,,;=.;.;.....~-_..;5;...;.12=:..o;;..;1..;;;24-_ _;5;.::3..:.:%:.-...--1
$ 232
s
50,000 $ (25 607) $ 24,393 s
1,290,000 $ -$ 1,290,000 $ 1,240,000 $ 610,093 47%
1,290,000 $ -$ 1,240,000 $ 1,291,214 $ 610,093 47%
PSA/Contract
100,000 $ 100,000 $ 100,000 $ 100,000 $ 88,544 89%
445,000 s 25,607 $ 470,607 $ 445,000 $ 25,607 $ 470,607 $ -0%
ITEM
CONTRACT
CON0 .. 1
EDMS:003779701
CHANGE ORDER STATUS REPORT
PLANT NO. 1 ANAEROBIC SELECTOR MIXING SYSTEMS
Job No. SP-74
APPROVAL CONTRACT CONTRACT COST PERCENTAGE
INCREASE DATE COST TO DATE (CUMULATIVE)
6/16/2003 $ 445,000.00 $ 445,000.00 0.00%
AUTHORIZED
TIME
(DAYS)
180
.. Pend_1na· . ,$. ~s,801.0~ $ . .. 41d,eotori· ,·, '·;. ' '· .. ;.~ .>~:~~t ' ' ; . ,'' ; :<. ~.75% .. :,,·r < .. :: ' : ;~ .. --...
AUTHORIZED TIME
TO DATE
(DAYS)
180
.t .4fi ... •. (· ....
t
I
Contractor:
Job:
Consultant:
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Denboer Engineering & Construction. Inc. C.O.:
Date:
Plant No. 1 Anaerobic Selector Mixing Systems. Job No. SP-74
Cathcart. Garcia. von Langen
Page 1of5
One (1)
October 27. 2004
Amount of this Change Order (Add) $25.607 .00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1: MODIFY MIXER SUPPORT STRUCTURES
The Contractor was directed to modify 5 steel structures that support the mixers as follows:
1. Cut, fit and weld 40 each C8x11.5 channel stiffeners to W8x24 beams
2. Cut, fit and weld 40 each C5x6. 7 channel stiffeners C5x11.5 channel
3. Cut, fit and drill 20 each MC6x12 channel cross braces with fasteners
4. Change 5 hatch shaft openings from 4" diameter to 8" diameter.
The above changes were not shown on the contract drawings and were required by the mixer
manufacturer, Philadelphia Mixers, to stiffen the mixer support structures. The Contractor required a
time extension of 45 calendar days to modify the supports. This work was negotiated with the
Contractor pursuant to Section 43 8. 1) of the General Requirements, Division 01.
(Reference FCO No. 1)
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 2: ELECTRICAL CONDUIT REROUTE
$10,472.00
45 Calendar Days
The Contractor was directed to modify the contract specified electrical conduit routing at the mixers.
The work included adding two additional concrete cores and re-routing conduit adjacent to pipe racks
to each motor location. The new routing required approximately 80 additional feet of %-inch PVC
coated steel electrical conduit. The conduit shown on the contract drawings was routed within and
across walkways resulting in trip hazards. District safety staff requested the conduit reroute. This
work was not included in the original contract and was accomplished on a time and materials basis
pursuant to Section 43 8. 2) b) of Division 01, General Requirements. (Reference FCO No. 2)
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
Days
$2,125.00
O Calendar
Contractor:
Job:
Consultant:
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Denboer Engineering & Construction. Inc. C.O.:
Date:
Plant No. 1 Anaerobic Selector Mixing Systems. Job No. SP-74
Cathcart. Garcia. von Langen
ITEM 3: ADDITIONAL CONDUIT AND FITTINGS
The Contractor was directed to add additional conduit and fittings as follows:
Page2 of5
One (1)
October 27. 2004
1. Increase length of the 2-inch conduit run from MCC Q in the Blower Building to Distribution
Panel 12D-002 from 315' to 500'
2. Increase the length of 3-each 1/0 conductors from 945' to 1560'.
3. Increase 1-each #6 ground conductor from 315' to 520'.
4. Add additional conduit supports, straps and fittings as required for installation of the additional
185' of 2-inch conduit.
There are no dimensions shown on the contract drawings for the referenced conduit run. Contract
Drawing E0011 is scaled 1" = 20' and the scaled length of conduit shown on drawing is approximately
315 linear feet. The actual length measured in the field is 500 linear feet. During the bid process,
Contractors use the scale on the contract drawings to estimate conduit and wiring lengths. This
discrepancy required an increase in conduit, fittings, straps, supports and conductors from the
amounts estimated during the bid process. This work was not included in the original contract and
was accomplished on a time and materials basis pursuant to Section 43 B. 2) b) of Division 01,
General Requirements. (Reference FCO No. 3)
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 4: MIXER MOTOR SUPPORTS
$9,546.00
O Calendar Days
The Contractor was directed to fabricate and install five steel brackets to support the mixer motors.
The Design Consultant reviewed the installation and determined that additional support was required
for each of the 5 mixer motors. The supports were not shown on the contract drawings. The
Contractor required a time extension of 35 calendar days to fabricate, hot-dip galvanize and install the
supports. This work was not included in the original contract and was accomplished on a time and
materials basis pursuant to Section 43 B. 2) of Division 01, General Requirements.
(Reference FCO No. 4)
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$3,464.00
35 Calendar Days
-
' I
"
Contractor:
Job:
Consultant:
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Denboer Engineering & Construction. Inc. C.O.:
Date:
Plant No. 1 Anaerobic Selector Mixing Systems. Job No. SP-7 4
Cathcart. Garcia. von Langen
ITEM 5: TIME EXTENSION
Page 3of5
One (1)
October 27. 2004
The Contractor is granted a 157-calendar day time extension due to the inability to make final power
connections for the mixer variable speed drives (VFD's) and mixer motors. The main electrical feeder
conductors for Job No. SP-7 4 are shown on the contract drawings terminated in Motor Control Center
(MCC) Q, located in the electrical room of the Blower Building. MCC Q was being replaced under
Contract J-33-1 A and the District did not take beneficial occupancy of this panel until May 13, 2004.
The Contractor agreed to waive any overhead charges for this time extension. This time extension
was negotiated with the Contractor pursuant to Section 43 B. 1) of the General Requirements,
Division 01.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
TOTAL ADDED COSTS THIS CHANGE ORDER:
TOTAL TIME EXTENSION THIS CHANGE ORDER:
$0.00
157 Calendar Days
$25,607.00
237 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Denboer Engineering & Construction. Inc. C.O.: One (1)
Page4of5
Date: October 27. 2004
Job: Plant No. 1 Anaerobic Selector Mixing Systems. Job No. SP-7 4
Consultant: Cathcart. Garcia. von Langen
Contractor:
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Denboer Engineering & Construction. Inc. C.O.:
Page 5of5
One (1)
Date: October 27. 2004
Job:
Consultant:
Plant No. 1 Anaerobic Selector Mixing Systems. Job No. SP-74
Cathcart. Garcia. von Langen
The additional work contained within this change order can be performed incidental to the prime work
and within the time allotted for the original contract and any extensions to the contract time made by
this change order. It is therefore mutually agreed that a time extension of 237 calendar days is
required for this change order, and that no direct or indirect, incidental or consequential costs,
expenses, losses, or damages have been or will be incurred by Contractor, except as expressly
granted and approved by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.O.:
Total Contract Time Extension:
Revised Contract Time:
Revised Final Completion Due Date:
Time Subject to Liquidated Damages:
Actual Final Completion Date:
June 16, 2003
180 Calendar Days
December 12, 2003
237 Calendar Days
237 Calendar Days
417 Calendar days
August 5, 2004
0
August 5, 2004
Original Contract Price
Prev. Authorized Changes
This Change (Add)
Amended Contract Price
$ 445. 000.00
$ 0.00
$ 25.607.00
$ 470.607.00
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Denboer Engineering & Construction. Inc. C.O.:
Date:
Job:
Consultant:
Plant No. 1 Anaerobic Selector Mixing Systems. Job No. SP-74
Cathcart. Garcia. von Langen
Board of Directors Authorization Date: October 27, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
CIP Project Manager
Approved by:
David A. Ludwin P .E.
Director of Engineering
Accepted by:
Denboer Engineering & Construction, Inc.
Contractor Date
EDMS 003780135
Date
Date
Page 6of5
One (1)
October 27. 2004
•
PDC COMMITTEE Meeting Date To Bel. of Di r.
10/07/04 10/27/04
AGENDA REPORT Item Number Item Number
Orange County Sanitation District
FROM : David Ludwin , Director of Engineering
Originator: Dean Fisher, CIP Project Manager
PDC04-81
SUBJECT: PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES ,
JOB NO. P1-37
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 15 to Primary Clarifiers 16-31 and Related Facilities, Job
No. P1-37, with Margate Construction, authorizing an addition of $67,937 and 143
calendar days, increasing the total contract amount to $71 ,377 ,380 .
SUMMARY
Background
13(c )
• Job Number P1-37 , Primary Clarifiers 16-31 and Related Facilities , i ncludes the
construction of 16 new primary clarifiers with all support equipment, improvements to
existing Primary Clarifi ers 6-15 , and improvements to Primary Clarifiers 1-5 .
• Brown and Caldwell prepared the plans and specifications and the contract was
awarded to Margate Construction on October 24, 2001.
• This change order includes 13 items of additional work and one item of deleted
work. There are one error and seven omissions associated with this change order.
There is a 143 day time extension associated with this change order. Liquidated
damages on this project are $3 ,000 per day and there are no bonus provisions .
Contract Schedule
Contract Start Date
Original Contract Completion Date
Total Number of Change Orders to Date
Current Contract Completion Date
Actual Completion Date
Days Subject to Liquidated Damages
H ldeptlagenda\Boa-d Agenda Reports\2004 Board Agenda Reports\1004\ltem 13(c).P1·37.doc
January 7 , 2002
November 7 , 2005
15
April 8 , 2006
NIA
N/A
Page 1
Change Order Content
Item Description Amount Days Type
No.
1 Influent Channel Gate Modifications 6 ,389 0 Omission
2 Polymer Building Floor Slabs 4,198 0 Omission
3 Isolation Valve Additions 7,398 0 Omission
4 Dilute Sludge Pump Orientation 7 ,974 0 Design Change
5 Cable Splice Change 1,876 0 Design Change
6 Electrical Conduit Routing 3,569 0 Omission/Error
7 Gallery Pipe Routing 2,852 0 Omission
8 Pipe Support Bracing 8 ,282 0 Omission
9 South Gallery Ramp Addition 6,277 0 Design Change
10 Input/Output Assignment 12,122 0 Design Change
11 Switchgear Battery Power Supply 3,109 0 Omission
12 Delete Sludge Sampler (808) 0 Design Change
13 Polymer Makedown Units 4 ,699 20 Changed Condition
14 Equipment Tagging (Time Ext.) 0 123 Design Change
Total Change Order $67,937 143
Item 1 modifies four large gates to avoid conflicts between the influent channel gates
and polymer piping.
Item 2 adds concrete equipment pads to protect electrical equipment from potential
water contact, and provides for additional concrete removal which was not shown on the
plans .
Item 3 adds four valves to improve the effectiveness of scum pump suction piping, and
adds 10 valves to allow steam traps to be isolated from the steam system.
Item 4 rotates six specified sludge pumps to improve vehicle clearance in the Primary
Clarifiers 6-31 main gallery.
Item 5 changes the type of cable splice kits in high voltage electrical manholes subject
to flooding . Because of the critical nature of this application, staff requested a product
which has been used previously at the District.
Item 6 provides a temporary power feed for new electrical gear to make it operational in
Phase 1 of this project. A portion of this item also includes an error associated with
conduit removal in the CenGen building , and the District will be seeking reimbursement
from the design consultant.
Item 7 changes the specified foul air ducting to avoid conflicts between the foul air
ducting and existing piping and facilities.
Item 8 adds seismic bracing for existing gallery pipe supports which were lowered per
the contract.
Item 9 provides a new ramp at the south end of Primary Clarifiers 16-31 , which
improves access , and reduces future ventilation and l ighting costs .
Item 10 changes the PLC programming distribution between processors. During
design , the code was not developed , and the memory requirements were not known .
H.ldeptlagenda\Boa-d A genda Reports\2004 Board Agenda Repons\1004\ltem 13(C) P 1-37.doc
Page 2
. ti
Item 11 upgrades a battery charger power supply which was not compatible with
specified charging equipment.
Item 12 eliminates piping and electrical power which was provided for sludge sampling
equipment. During design, the sampling technology was developing. It was anticipated
that an acceptable unit would be available by this time, but that has not occurred.
Item 13 adds programming and electrical cable to accommodate a different type of
polymer makedown unit which was installed by staff after the design of this project.
Item 14 provides the contract time extension associated with a previous change order.
These changes were not included with the original change order item because the
schedule impact was not known at that time.
Job Completion
The project is 83% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on October 24, 2001.
Please refer to the attached Change Order Status Report for more information on
previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price
Previously Authorized Changes
This Change
Change Orders to Date
Percentage Increase to Date
Amended Contract Price
BUDGET IMPACT
$ 70,366,000
$ 943,443
$ 67,937
$ 1,011,380
1.44%
$ 71,377,380
~ This item has been budgeted. (Line item: Section 8, CIP, P1-37)
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
None.
ALTERNATIVES
No alternatives are proposed.
H:\dept\agenda\Soard Agenda Reports\2004 Board Agenda Repoits\1004\llem 13{c).P1-37.doc
Page 3
CEQA FINDINGS
This project was included in the Strategic Plan EIR that was certified on October 27,
1999. A Notice of Determination was filed on October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1004\ltem 13(c).P1-37.doc
Page4
"
PROJECt1PtlA8e
Phase 1 -Prolect Development
Phase 2 -Preliminary Design
Phase 3 -Deslan
Phase 4 -Construdlon
Phase 5 -Commisslonina
Phase 6 -Closeout
Phase 7 -Contingency
PROJECT TOTAL $
!Reimbursable Costs
PROJECT NET $
Design PSA
Construction Contract
EDMS\003779306
BUDGET INFORMATION TABLE
Primary Clarlfiers No. 16-31 and Related Facllitles
Job No. P1-37
: ~ ':_
$ 173,000 :-t,'.ii·'. ·. > ' $ 173,000 $ 77,000
{~Hr·.
$ 316,000 .. .y,. .. :·~ ·' : $ 316,000 '·>·· $ 315,000
·} ;,,:;; .... : .. • 'i.~:
$ 4,556,000 .. $ 4,556,000 1.:: $ 4,542,000
$ 80,596,000 f' ·61.937 $ 80,663,937 ~.
$ 80,596,000
$ 283,000 ~ . ' , $ 283,000 $ 281,880
$ 60,000 , ..... ,.: $ 60,000
...
$ 2,577,000 $ .·.:. (87.9371 $ 2,509,063 ...
$
$
-$ 88,561,000 $ -$ 88,561,000 ,: .:i $ 85,811,880 $ 67,937 $
1·· · :.:._.:.:;; . I
'''"::'''•1 ..• · ,·.:·· .. •, .,,, , .• .....
.....
-$ 88,561,000 $' . ' ,' . ... $ 88,561,000 ,• $ 85,811,880 $
PSA/Contract
•I': l,.: :j' .:: " . .. .
$ 6,198,861 . . .,>· ' $ 6,198,861 $ 6,198,861 ·~; ·'"·• '": ~:~~· .· .i ,: , .; ·. r. ,.. . $
$ 71,309,443 ,,_::,<. 8t.IJ37 $ 71,377,380 : $ 71,309,443
77,000 $ 173,000 225%
315,000 $ 315,552 100%
4,542,000 $ 4,566,000 101%
80,663,937 $ 64,307 ,000 80%
281,880 $ 13,000 5%
85,879,817 $ 69,374,552 81%
85,879,817 $ 69,374,552 81%
6,198,861 $ 5,182,000 84%
71,377 ,380 $ 57,296,200 80%
CHANGE ORDER STATUS REPORT
PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES
JOB NO. P1-37
APPROVAL CONTRACT CONTRACT COST PERCENTAGE ITEM DATE COST TO DATE INCREASE
CONTRACT 6/23/1999 $ 70,366,000.00 $ 70,366,000.00 0.00
CO N0.1 12/19/2001 $ 0.00 $ 70,366,000.00 0.00
*CO NO. 2 8/1/2002 $ 75,214.00 $ 70,441,214.00 0.11
**CO NO. 3 10/21/2002 $ 48,736.00 $ 70,489,950.00 0.18
CON0.4 12/18/2002 $ 356,059.00 $ 70,846,009.00 0.68
CO NO. 5 2/26/2003 $ 33,527.00 $ 70,879,536.00 0.73
CON0.6 4/23/2003 $ 54,992.00 $ 70,934,528.00 0.81
CONO. 7 6/25/2003 $ 14,750.00 $ 70,949,278.00 0.83
CON0.8 8/27/2003 $ 5,363.00 $ 70,954,641.00 0.84
CONO. 9 10/22/2003 $ 187,452.00 $ 71, 142,093.00 1.10
CO N0.10 11/19/2003 $ 56,041.00 $ 71, 198, 134.00 1.18
CO NO. 11 12/4/2003 $ 20,680.00 $ 71,218,814.00 1.21
CO N0.12 2/25/2004 $ 22,390.00 $ 71,241,204.00 1.24
CO N0.13 3/24/2004 $ 784.00 $ 71,241,988.00 1.24
CO N0.14 5/26/2004 $ 67,455.00 $ 71,309,443.00 1.34
bONo;J5, _ ·. Pefiatng .: __ ... ; ,,.~;:;: .; .... ~#.i&,~~$Js1:00,: ::'>.$.•;', . t.1 ~.371 .. 3~ctbt>·· .. f . . .t . . • >~<'. -~ ·:~~~,1~~Hfl~?~~,:~i;·i.
* Approved by PDC Committee per delegated authority by Board Resolution 99-23
** Approved by General Manager per delagated authority by Board Resolution 99-23
EOMS\003779321
AUTHORIZED
TIME
(DAYS)
1400
0
49
0
82
0
21
0
0
0
0
0
0
0
0
;:.;i:~~~~\;2 ;jj4a,:'.;~:J:?it~,.:"
AUTHORIZED TIME
TO DATE
(DAYS)
1400
1400
1449
1449
1531
1531
1552
1552
1552
1552
1552
1552
1552
1552
1552
;),;{~;{\,/j~Q6;,:;· -:~·:·:·; ;
\
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 1of7
Contractor: Maraate Construction. Inc. C.O. No.: Fifteen (15)
Date: October 27. 2004
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
Amount of this Change Order (Add)(QedYst) $67.937.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 -INFLUENT CHANNEL GATE MODIFICATION
This item modifies the dimensions and frames of four 84-inch x 135-inch influent channel gates. This
change provides additional gate frame details, and avoids conflict with specified polymer piping above
the gate. The majority of the added costs associated with this item are for extending the concrete
adjacent to the gate frame. This was needed to avoid piping conflicts and resulted in a slightly more
narrow gate width. This change was discovered prior to gate fabrication. The work was
accomplished on contractor's force account pursuant to Section 48 (8) 2 of the General Requirements
(Reference FCO-P137-105).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 2 -POLYMER BUILDING FLOOR SLABS
$6,389.00
0 Calendar Days
This item provides for the additional effort to remove an existing four feet by eight feet concrete deck
over an existing trench in the Polymer Building. The slab was shown on the plans as being four
inches thick, but the actual thickness was eight inches. This item also adds 200 square feet of
housekeeping pads under the electrical equipment in the polymer electric room. The housekeeping
pads were not shown on the plans, and were requested by District staff. The pads will raise the
equipment to avoid contact with water from the adjacent Polymer mixing facility. The work was
accomplished on contractor's force account pursuant to Section 48 (8) 2 of the General Requirements
(Reference FCO-P137-160, FCO-P137-182).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$4,198.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page2 of7
Contractor: Margate Construction. Inc. C.O. No.: Fifteen (15)
Date: October 27. 2004
Job: Primarv Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 3-ISOLATION VALVE ADDITIONS
This item adds four, eight-inch isolation valves to the scum decant piping system. These valves,
located on the scum pump vent piping, will allow operations staff to isolate the suction piping from the
vent piping. The change responds to a concern that air could enter the system through the vent
piping, and prevent full drainage of the scum pits. This item also adds a 1-inch stainless steel ball
valve to (10) steam traps, which allows the steam system to remain in service during maintenance of
the individual steam traps. The work associated with FCO 162 was accomplished on contractor's
force account pursuant to Section 48 (8) 2 of the General Requirements. The costs associated with
FCO 185 were negotiated with the Contractor pursuant to Section 48 (8) 1 of the General
Requirements (Reference FCO-P137-162, FCO-P137-185).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 4 -DILUTE SLUDGE PUMP ORIENTATION
$7,398.00
0 Calendar Days
This item modifies the orientation of six specified 50 hp dilute sludge pumps in the Primary Clarifiers
6-15 and 16-31 main galleries. Per the plans, the pumps were oriented perpendicular to the gallery
centerline. Rotating the pumps away from the center of the gallery provides more clearance for
vehicle access through the gallery, and improves maintenance access to the pumps. The work
associated with FCO 163 was accomplished on contractor's force account pursuant to Section 48 (8)
2 of the General Requirements. The costs associated with FCO 166 were negotiated with the
Contractor pursuant to Section 48 (B) 1 of the General Requirements (Reference FCO-P137-163,
FCO-P137-166).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 5 -CABLE SPLICE CHANGE
$7,974.00
0 Calendar Days
This item provides Raychem cable splice kits in lieu of the specified cable splices. These cable
splices were installed in 12 kV electrical manholes which are subject to flooding. The specified
materials have not been previously used at the District. Due to the critical nature of these facilities
and concerns about water penetration into the splices, District staff recommended the use of
materials which have been successfully utilized at the District in the past. The work was
accomplished on contractor's force account pursuant to Section 48 (B) 2 of the General Requirements
(Reference FCO-P137-169).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$1,876.00
0 Calendar Days
,
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 3 of7
Contractor: Maraate Construction. Inc. C.O. No.: Fifteen (15)
Date: October 27. 2004
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 6 -ELECTRICAL CONDUIT ROUTING
This item provides a temporary electrical power feed to electrical panel 18KDPN006 from the 480 volt
switchgear in Power Building #7. Operation of this panel is needed for Phase 1 improvements, but
the plans did not provide power to the panel until Phase 3 (FCO #195). This item also adds 240 LF of
TC012 cable, and deletes 120 LF ofTC014 cable in the Central Power Generation Facility to correct a
discrepancy in the plans (FCO #172). The costs associated with FCO 195 were negotiated with the
Contractor pursuant to Section 48 (B) 1 of the General Requirements. The work associated with FCO
172 was accomplished on contractor's force account pursuant to Section 48 (B) 2 of the General
Requirements (Reference FCO-P137-172, FCO-P137-195).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 7 -GALLERY PIPE ROUTING
$3,569.00
O Calendar Days
This item modifies 100 feet of 12-inch foul air duct in the Primary Clarifiers 6-15 east and west scum
galleries in order to avoid conflicts which were not shown on the duct plans. In the west gallery, the
conflict involved an existing blower room wall and a concrete roof beam. In the east gallery, the
conflict involved existing piping. These conflicts were avoided by routing portions of the duct on the
top deck in lieu of in the gallery as shown on the plans. Compensation provides for the purchase of
12 additional pipe supports, and the labor to mount the supports on the top deck. This item also
modifies 10 feet of an existing 1-inch steam line in the Primary Clarifiers 6-14 scum gallery which was
not shown on the plans, in order to avoid conflict with a vertical section of specified 36" foul air duct.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 48(B)1 of the General Requirements (Reference FCO-P137-176, FCO-P137-180).
ADDED COST THIS CHANGE ORDER ITEM: $2,852.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 8 -PIPE SUPPORT BRACING
This item provides additional bracing for 150 feet of existing pipe supports in the Primary Clarifiers 6-
15 scum gallery. The pipelines, ranging in size from two-inches to 16-inches, convey primary sludge,
plant water, potable water, industrial water, steam, high-pressure air, instrument air, polymer, and
ferric chloride. The plans required the piping and the associated pipe supports to be lowered, but did
not provide for the additional bracing which is needed for seismic restraint. The work was
accomplished on contractor's force account pursuant to Section 48 (B) 2 of the General Requirements
(Reference FCO-P137-181 ).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$8,282.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page4 of7
Contractor: Maraate Construction. Inc. C.O. No.: Fifteen (15)
Date: October 27. 2004
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 9 -SOUTH GALLERY RAMP ADDITION
This item provides an additional access ramp at the south end of the new Primary Clarifiers 16-31
main gallery. The work includes grading and concrete for the ramp, and an architectural cover wall on
the centerfeed channel and effluent channels above the ramp. The ramp improves access to the
gallery and will reduce future ventilation and lighting costs. This item includes a credit to delete the
specified temporary concrete knock-out wall which was to be constructed at the end of the gallery.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 48 (8) 1 of the General Requirements (Reference FCO-P137-183).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 10-INPUT/OUTPUT ASSIGNMENT
ss,2n.oo
O Calendar Days
This item resolves a problem with the capacity of the PLC controlling the Primary Clarifiers 16-30
(Thick Sludge). Per the Contract, the PLC program logic was developed by the Contractor during
Construction. The size of the program for this system exceeded the amount of PLC memory
assumed during design. The needed capacity was provided by converting the specified hot-standby
PLC into two separate processors ("A" and "8"}. The Remote 110 was reconfigured to route MCC-TA
to the "A" PLC and MCC-TB 1/0 to the "811 PLC. This change compensates the Contractor for
approximately 100 additional hours of programming, and moves six 110 from MCC-X to Panel
11 HPNL001 in order to clarify the 110 list. The costs associated with this Change Order item were
negotiated with the Contractor pursuant to Section 48 (8) 1 of the General Requirements (Reference
FCO-P137-184, FCO-P137-191 ).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 11 -SWITCHGEAR BATTERY POWER SUPPLY
$12,122.00
0 Calendar Days
This item upgrades the switchgear battery power supply in Power Building #7 from 1-phase to 3-
phase. The specified 1-phase input was not compatible with the specified 3-phase battery charger.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 48 (B) 1 of the General Requirements (Reference FCO-P137-189).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$3,109.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 5 of7
Contractor: Maraate Construction. Inc. C.O. No.: Fifteen (15)
Date: October 27. 2004
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
ITEM 12 -DELETE SLUDGE SAMPLER
This item provides a credit to delete the specified conduit, wiring, and piping associated with District-
supplied sludge samplers. During design, the District was evaluating various sampler technologies
which were developing, and the plans provided for their installation. Since that time, the District has
decided to defer the purchase of sludge samplers until improved technology is available. The costs
associated with this Change Order item were negotiated with the Contractor pursuant to Section 48
(B) 1 of the General Requirements (Reference FCO-P137-193).
CREDIT THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 13 -POLYMER MAKE-DOWN UNITS
$(808.00)
0 Calendar Days
This item provides 30 hours of additional programming effort, and minor electrical cable changes
related to the existing Polymer Make-down units. During Construction it was discovered that the type
of polymer make-down units had been replaced by staff after the design of this project. This work is
needed to make the Contract Documents compatible with the new units. This work was determined to
be on the critical path, and a contract time extension was justified. The costs associated with this
Change Order item were negotiated with the Contractor pursuant to Section 48 (B) 1 of the General
Requirements (Reference FCO-P137-200).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 14 -EQUIPMENT TAGGING <TIME EXTENSION)
$4,699.00
20 Calendar Days
This item provides the contract time extension associated with a previous change order. It was
determined that the changes involved with Item 14 of Change Order 7 (Equipment Tagging Changes).
delayed the critical path of the project 123 days. A time extension was not included with the original
change order because the schedule impact was not known at that time. This change affected the
Contractor's production of panel drawings, equipment and programming submittals, database
creation, and loop drawings. The time extension associated with this Change Order item was
negotiated with the Contractor pursuant to Section 48 (B) 1 of the General Requirements (Reference
FCO-P137-060).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
TOTAL ADDED COST THIS CHANGE ORDER:
TOTAL TIME EXTENSION THIS CHANGE ORDER:
$0.00
123 Calendar Days
$67,937.00
143 Calendar Days
Page 6 of7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction. Inc. C.O. No.: Fifteen (15)
Date: October 27. 2004
Job: Primarv Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
The additional work contained in this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that 143 days extension
of time to perform the work is required for this Change Order. District and Contractor agree that this
extra work impacts the critical path scheduling of the prime work, resulting in an overall extension of
time for completion of the prime work. District and Contractor agree that the added cost described in
the Items above constitutes full and equitable consideration for all the impacts incurred by the
Contractor, and no other direct or indirect, incidental or consequential costs, expenses, losses or
damages have been or will be incurred by Contractor, except as expressly granted and approved by
this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.O.:
Total Contract Time Extension:
Revised Contract Time:
Revised Final Completion Due Date:
Time Subject to Liquidated Damages:
Actual Final Completion Date:
January 7, 2002
1,400 Days
November 7 ,2005
143 Days
295 Days
1695 Days
August29,2006
NIA
NIA
Original Contract Price
Prev. Authorized Changes
This Change (Add) EQeeYst)
Amended Contract Price
$ 70.366.000.00
$ 943.443.00
$ 67.937.00
$ 71.377 .380.00
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 7 of7
Contractor: Margate Construction. Inc. C.O. No.: Fifteen (15)
Date: October 27. 2004
Job: Primary Clarifiers 16-31 and Related Facilities. Job No. P1-37
Consultant: Brown and Caldwell
Board Authorization Date: October 27, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Dean Fisher
CIP Project Manager
Approved by:
David A. Ludwin, P.E.
Director of Engineering
Accepted by:
MARGATE CONSTRUCTION
Contractor
EDMS/00379320
Date
Date
Date
PDC COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Hardat Khublall, Project Manager
Mee ti ng Da t e
10/07/04
Item Number
PDC04-8 2
SUBJECT: WARNER AVENUE RELIEF SEWER, CONTRACT NO. 11-22
GENERAL M ANAGER'S RECOMMENDATION
To Bel. of Dir.
10/27/04
Item Number
13{d )
Ratify Change Order No. 4 to Warner Avenue Relief Sewer, Contract No. 11-22, with
ARB , Inc., authorizing an addition of $47 ,616, increasing the total contract amount to
$5,506,958.
SUMMARY
Background
• This project, located in the City of Huntington Beach, consists of improvements to
rel ieve hydraulic deficiencies on two separate reaches of the existing Warner
Avenue Relief Sewer and to relieve deficiencies in the overall drainage basin
tributary to that trunk sewer. The 1999 Strategic Plan identified these two reaches of
the Warner Avenue Relief Sewer as hydraulically deficient and i n need of
replacement.
• Tetra Tech, Inc. prepared the plans and specifications and the construction contract
was awarded to ARB, Inc. on May 28, 2003.
• Change Order No. 4 includes seven items of added work t o Contract No. 11-22.
There are no errors or omissions associated with this Change Order. The contract
includes liquidated damages of $750 per day and no bonus provisions.
PRIOR COMMITTEE/BOARD ACTIONS
Contract Schedule
Contract start date
Original contract completion date
Total number of change orders to date
Current contract completion date
Revised completion date
Days subject to liquidated damages
Liquidated damages assessment
Revised. 06/0ll/03
July 9 , 2003
September 2 , 2004
4
October 5, 2004
October 5, 2004
N/A
N/A
Page 1
PROJECT/CONTRACT COST SUMMARY
Change Order No . 4 Content
Item No. Description Amount Days Type
1 Alignment Conflict With Water $ 9 ,947 0 Changed
Main Valves Conditions
2 Extra Trench Due To Inaccurately $ 1,981 0 Changed
Marked Utility Conditions
3 Additive For Asphalt Mix $ 8 ,050 0 Design Change
4 Installation Of Waterline Isolation $ 9,968 0 Design Change Valves
5 Remove And Replace Curb And $ 3 ,588 0 Design Change Gutter
6 Install Manhole Concrete Collars $ 2 ,385 0 Design Change
7 Modifications To Manhole Bases $11 ,697 0 Design Change
TOTAL -CHANGE ORDER NO. 4 $47,616 0
Item 1 is for the realignment of a 21 -inch sewer line at Los Patos and Bolsa Chica to
avoid the interference from a section of a City waterline that ran parallel to the
contractor's trench , and from two water valves. The City as-built drawings did not
accurately mark the location of these utilities.
Item 2 is for the relocation of a box shield that was initially set in place to excavate for a
new manhole (Balsa Chica Street and Warner). Due to an inaccurately marked District
sewer line location taken from District as-built drawings, the box was moved , leaving an
excavation void that had to be backfilled.
Item 3 is for the addition of a latex material to the asphalt mix that was not included in
the specifications . This information was not available during design . The City informed
staff during construction that the latex additive is a requirement for all major
intersections and is now included in their standards .
Item 4 is for the installation of two waterline isolation valves per the direction of the City
of Huntington Beach. The Contractor was planning to support an existing City waterline
in place that crossed over a service lateral that was being connected to a new manhole .
The old asbestos cement pipe (ACP) waterline was deemed to be too fragile to support
in place .
Item 5 is for the removal and replacement of a section of curb and gutter at the
intersection of Graham and Warner per the direction of the City of Huntington Beach .
The final grades for the asphalt paving cap (as per survey) indicated that a raised lip
would have occurred adjacent to this curb and gutter return section. Apparently this
section had settled , and the City requested that it be removed and raised to match the
design grades.
Revised 06/04/03 Page 2
>
Item 6 is for the addition of concrete collars around the frame and covers for five
manholes located on Los Patos. The District's Maintenance Department requested that
they be installed for preventative maintenance reasons. This information was not made
available during design.
Item 7 is for the rehabilitation of the existing manhole bases and shelves for the five
manholes located on Los Pates. Further investigations conducted during the lining
operations through these manholes, indicated that the bases were badly deteriorated.
Staff elected to rehabilitate the subject area for long term preventative maintenance
reasons. The condition of the bases was not known during design. It would have
required a confined space entry as opposed to a visual inspection by simply removing
the cover.
Job Completion
This contract in now 99% complete.
PRIOR COMMITTEE/BOARD ACTIONS
This contract was awarded by the Board of Directors on May 28, 2003. Please refer to
the attached Change Order Status Report for more information on previous change
orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price
Previously Authorized Changes
This Change Order (Add)
Change Orders to Date
Percent Increase to Date
Amended Contract Price
$ 5,089,040
$ 370,302
$ 47,616
$ 417,918
8.21%
$ 5,506,958
Authorization of $47,616 is being requested to fund Change Order No. 4. This amount
is being reallocated from Phase 7 (Contingency) to cover the extra construction costs
on Phase 4 (Construction).
BUDGET IMPACT
cg) This item has been budgeted. (Line item: FY 04/05, Section 8, Page 46, Capital
Improvement Program, Collections Facilities Relief Sewer, Contract No. 11-22)
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
None
Revised. 06/04/03 Page3
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program Environmental Impact
Report certified on October 27, 1999. A Notice of Determination was filed on
October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order No. 4
HK:bp:dt:lc:ba:lc
H:\ntglobal\Agenda Draft Reports\PDC\11-22 C04 AR.doc
Revised: 06/04/03 Page4
PROJECT/PHASE
Phase 1 -Prolect Development
Phase 2 -Preliminary Design
Phase 3 -Deslan
Phase 4 -Construction
Phase 5 -Commissioning
Phase 6 -Close-Out
Phase 7 -Contingency
PROJECT TOTAL
Reimbursable Costs
PROJECT NET
Deslan PSA
Construction Contract
EDMS: 003778464
ORIGINAL.:
AUTHORIZED
BUDGET
$ 10,200
$ 10,000
$ 400,000
$ 2,696,600
$ 128.000
$ 37,000
$ 929,500
$ 4,211,300
$
$
$
$
$
$
$
$
$
$ 4,211,300 $
$ 282,479 $
$ 5,089,040 $
54,000
6,000
750,000
6,298,088 $
128,000
37,000
206,932 s
7,480,000
10,000
7,470,000 s
440,979
5,459,342 s
BUDGET INFORMATION TABLE
WARNER AVENUE RELIEF SEWER
CONTRACT N0.11-22
$ 54,000 $ 54,000
$ 6,000 $ 6,000
$ 750,000 $ 750,000
47,616 $ 6,345,684 $ 6,298,068 $
$ 128,000 $ 55,000
$ 37,000 $ 14,000
(47,616) $ 159,316
$ 7,480,000 $ 7,177,068 $
$ 10,000 $ 10,000
-$ 7,470,000 s 7,167,068 s
PS A/Contract
$ 440 979 $ 440,979 $
47818 $ 5,506 958 .·. $ 5,459,342 $
....
~ . ~. -'~' " . • !'.;.-,. •·. .
$ 54,000 $ 53,441 99%
s 6,000 s 4,579 76%
$ 750,000 $ 731,606 98%
47,816 $ 6,345,684 $ 5,890,406 93%
s 55,000 $ 21,672 39%
$ 14,000 s 7,313 52%
$
47,616 $ 7,224,684 $ 6,709,017 93%
$ 10,000 $ 10,000 100%
47,616 $ 7,214,684 $ 6,699,017 93%
-s 440,979 $ 401,900 91%
47.816 $ 5,506,958 $ 4,341,971 79%
APPROVAL ITEM DATE
CONTRACT 7/9/2003
CO NO. 1* 11/10/2003
CON0.2 4/28/2004
CONO. 3 7/21/2004
CON0.4 Pending
CHANGE ORDER STATUS REPORT
WARNER AVENUE RELIEF SEWER
CONTRACT N0.11-221 CO #4
CONTRACT CONTRACT COST PERCENTAGE
COST TO DATE INCREASE
$5,089,040 $5,089,040
$153,000 $5,242,000 3.01%
$182,109 $5,424,149 6.58%
$35,193 $5,459,342 7.28%
$47,616 $5,506,958 8.21%
• Approved by PDC Committee per delegated authority by Board Resolution 99-23
EDMS: 003778617
AUTHORIZED AUTHORIZED TIME
TIME TO DATE
(DAYS) (DAYS)
420 420
10 430
23 453
0 453
0 453
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 1of5
Contractor: ARB, INC, C,O, No,: Four (4)
Date: October 27. 2004
Job: WARNER AVENUE RELIEF SEWER. CONTRACT NO, 11-22
ConsuHant: TETRA TECH. INC.
Amount of this Change Order (Add) $47 .616.00
In accordance with contract provisions, the following changes In the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 -ALIGNMENT CONFLICT WITH WATERMAIN VALVES
This item is for labor, equipment, and material required to modify the design alignment at Los Patos
and Bolsa Chica, to avoid a conflict with two city water main valves. The locations of these two valves
were inaccurately marked on the design plans (City As-built Drawings), The extra work consisted of
installing a field closure between the new sewer line and the existing sewer line at Station No. 36+50,
and connecting a bypass between new manhole numbers 9 and 10. This work was accomplished by
Contractor's force account pursuant to Section 44.B.2 of the General Requirements (Reference FCO
No. 0014),
ADDED COST THIS CHANGE ORDER ITEM: $ 9,947.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2 -EXTRA TRENCH DUE TO INACCURATELY MARKED UTILITY
This item is for labor, equipment, and material required to perform extra excavation and backfill during
the construction of a manhole base located at Station No. 228+04 (MH No. 37). A voided space
remained after a box shield was relocated to avoid interference with an existing sewer line that was
inaccurately marked on the design plans. The extra work consisted of resetting a manhole box shield
and back filling the void or space left with a slurry materiaL This work was accomplished by
Contractor's force account pursuant to Section 44.B.2 of the General Requirements (Reference FCO
No, 0015),
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 3 -ADDITIVE FOR ASPHALT MIX
$ 1,981,00
0 Calendar Days
This item is for labor, equipment, and material required to add a 2 percent latex material to the asphalt
mix to cover approximately 35,000 square feet of cap paving at the intersection of Graham and
Warner. The City of Huntington Beach requested to have the District's Contractor include in the
asphalt mix, a 2 percent latex, that was not included in the contract specifications, but is a
requirement in the City of Huntington Beach Standard Specifications, This item was negotiated with
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 2of5
Contractor: ARB, INC, C.O. No.: Four (4)
Date: October 27. 2004
Job: WARNER AVENUE RELIEF SEWER. CONTRACT NO. 11-22
Consultant: TETRA TECH. INC.
the Contractor pursuant to Section 44.B.2 of the General Requirements (Reference FCC No. 0016).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 4 -INSTALLATION OF WATERLINE ISOLATION VALVES
$ 8,050.00
0 Calendar Days
This item is for labor, equipment, and material required to install two 8-inch isolation valves on a City
waterline at Leslie Lane and Warner (Station Nos. 57+80 and 59+30). A service lateral connection to
a new drop manhole would require exposing and supporting in-place an existing 8-inch asbestos
cement pipe (ACP) city waterline that crosses above the service lateral. The City did not want this
waterline supported in-place, due to the high risk of a leak occurring, which could potentially flood the
trench, lose the shoring system and possibly damage the street pavement. Therefore, in lieu of
supporting the waterline, staff directed the Contractor to take this line temporarily out of service by
installing isolation valves on each side of Leslie Lane. The extra work consisted of the procurement
costs for the two gate valves and their installation, the disposal costs for the ACP pipe, and forty (40)
cubic yards of slurry mix for the backfill of the trench, etc. This work was accomplished by
Contractor's force account pursuant to Section 44.B.2 of the General Requirements (Reference FCO
No. 0017).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 5 -REMOVE AND REPLACE CURB AND GUITER
$ 9,968.00
O Calendar Days
This item is for labor, equipment, and material required to remove and replace the curb and gutter at
the curb return located at the northeast comer of Graham and Warner. The Contractor's scope-of-
work at the intersection of Graham and Warner required him to grind and place an asphalt concrete
final cap varying in thickness between 2-inches to 4-inches. At the northeast comer curb return area,
the final grades, as staked out, indicated that a raised lip would have occurred at the point where the
new asphalt joined the gutter line. The existing curb and gutter in this area was below the design plan
elevations. This was deemed unacceptable by the City of Huntington Beach. To resolve the problem,
the City directed staff to raise approximately 39 feet of the curb and gutter at the subject curb return.
This item was negotiated with the Contractor pursuant to Section 44.B.2 of the General Requirements
(Reference FCO No, 0018).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$ 3,588.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 3of5
Contractor: ARB. INC. C.O. No.: Four (4)
Date: October 27. 2004
Job: WARNER AVENUE RELIEF SEWER. CONTRACT NO. 11-22
Consultant: TETRA TECH. INC.
ITEM 6-INSTALL MANHOLE CONCRETE COLLARS
This item is for labor, equipment, and material required to install concrete collars around five existing
manhole frames and covers on Los Patos between Marina View and Bolsa Chica. The District's
maintenance department requested that the contractor build 6 feet by 6 feet concrete collars around
these manholes which are located in a dirt area just off the paved street right-of-way. From a
preventative maintenance standpoint, this would assist in their subsequent location and access within
the dirt area, and minimize dirt being washed into the manholes. This work was accomplished by
Contractor's force account pursuant to Section 44.B.2 of the General Requirements (Reference FCO
No. 0019).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 7 -MODIFICATIONS TO MANHOLE BASES
$ 2,385.00
O Calendar Days
This item is for labor, equipment, and material required for the restoration of five existing manhole
bases on Los Patos located between Marina View and Bolsa Chica Street. During the rehabilitation of
these manholes, further inspection of the manhole shelves and bases indicated that they were badly
deteriorated. For long-term preventative maintenance reasons, staff elected to recondition the bases,
which was not included in the contract scope of work. The extra work consisted of surface
preparation, mortar repair, application of a Zebron polyurethane coating, spark testing, etc. This item
was negotiated with the Contractor pursuant to Section 44.B.2 of the General Requirements
(Reference FCO No. 0020).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
TOTAL ADDED COST THIS CHANGE ORDER:
TOTAL TIME EXTENSION THIS CHANGE ORDER:
$ 11,697.00
0 Calendar Days
$ 47,616.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS A VENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page4of5
Contractor: ARB, INC, C.O. No.: Four (4)
Date: October 27. 2004
Job: WARNER AVENUE RELIEF SEWER. CONTRACT NO. 11-22
Consultant: TETRA TECH. INC.
The additional work contained in this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that a no extension of
time to perform the work is required for this Change Order. District and Contractor agreed that the
added costs described above constitutes full and equitable consideration for all the impacts incurred
by the Contractor, and no other direct or indirect. incidental or consequential costs, expenses, losses
or damages have been or will be incurred by Contractor, except as expressly granted and approved
by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.0.:
Total Contract Time Extension:
Revised Contract Time:
Revised Final Completion Due Date:
Time Subject to Liquidated Damages:
Actual Final Completion Date:
July 9, 2003
420 Calendar Days
September 2, 2004
0 Calendar Days
33 Calendar Days
453 Calendar Days
October 5, 2004
NIA
Original Contract Price
Prev. Authorized Changes
This Change (Add) (DeeYst)
Amended Contract Price
$
$
$
$
5.089.040.00
370.302.00
47.616.00
5.506.958.00
t
c
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: ARB INC. C.O. No.: Four (4)
Page 5of5
Date: October 27. 2004
Job: WARNER AVENUE RELIEF SEWER. CONTRACT NO. 11-22
Consultant: TETRA TECH. INC.
Board Authorization Date: October 27, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Hardat Khublall,
CIP Project Manager
Approved by:
David A. Ludwin, P.E.
Director of Engineering
Accepted by:
Contractor
EDMS: 003778682
Date
Date
Date
• PDC COMMITTEE Meeting Date To Bel. of Dir.
10/07/04 10/27/04
AGENDA REPORT Item Number Item Number
Orange County Sanitation District
FROM: David Ludwin , Director of Engineering
Originator: Bob Schirripa, Project Manager
SUBJECT: SECONDARY TREATMENT FACILITIES PROCESS
UPGRADES AT PLANT NO . 2, JOB NO. P2-47-3
GENERAL MANAGER'S RECOMMENDATION
PDC04-83
Ratify Change Order No. 1 to Secondary Treatment Facilities Process Upgrades at
Plant No. 2 , Job No. P2-47-3 , with Morrow-Meadows Corporation , authorizing an
addition of $205 ,903, increasing the total contract amount to$ 4,917 ,903.
SUMMARY
• Job No. P2-47-3 provides for the rehabilitation of electrical equipment,
instrumentation, and controls at the Activated Sludge Treatment Process
(Secondary Treatment Plant), located at Plant No. 2 .
13(e)
• Lee & Ro prepared the plans and specifications and the contract was awarded to
Morrow-Meadows Corporation on November 6 , 2003.
• Change Order No. 1 includes eleven items of added work and one item of deleted
work to Job No. P2-47-3. There are four Omissions and no Errors associated with
this Change Order. The contract includes liquidated damages at $2 ,000 per day and
no bonus provisions.
Contract Schedule
Contract Start Date
Original Contract Completion Date
Total Number of Change Orders to Date
Current Contract Completion Date
Actual Completion Date
Days Subject t o Liquidated Damages
Revised 06/04/03
November 6, 2003
March 4 , 2005
1
March 4 , 2005
N/A
NIA
Pag e 1
Change Order No. 1 Content
Item Description Amount Days Type
No.
1 Deletion of Builder's All Risk ($20,000) 0 Design Change
Insurance
2 Additional Racking at Scott and $36,597 0 Design Change
Headman Tunnels
3 Relocation of Existing Outlets $2 ,492 0 Omission
4 Fiber Optic Cabinet Power Circuits $8 ,360 0 Omission
5 Additional Cables for Aerator Motors $28 ,551 0 Omission
6 Additional Fiber Optic Conduit $6 ,026 0 Omission
7 Gas Analyzer Conduit Addition $35,660 0 Design Change
8 Relocate Fiber Optic Panel $2 ,025 0 Design Change
9 Programming Modifications $13,935 0 Design Change
10 Replace Seal Tite Connectors on the $30,929 0 Design Change
Aeration Mixers
11 Replace Two Gas Monitoring Systems $12,219 0 Design Change
12 Additional Cable Tray Under the $49,109 0 Design Change
Pump Control Rooms
Total Change Order No. 1 $205,903 0
Item 1 credits the District for Builder's All Risk Insurance supplied by the Contractor.
The District's existing insurance provides adequate coverage for this project.
Item 2 provides additional supports to re-route conduit under the pump rooms and in the
Scott and Headman Tunnels. This design change was required by District staff to
facilitate future maintenance and access needs .
Item 3 relocates three existing electrical outlets in the East Pump Control Room in order
to avoid interference with the installation of new PLC and RIO cabinets. The change
was required to support the needs of operations staff.
Item 4 provides additional power circuits, conduit, and wire to three fiber optic panels .
The power circuits were omitted from the Contract Documents, and were required to
provide an operational system .
Item 5 provides additional multi-conductor cable for eight aerator mixer motors that were
omitted from the Contract Documents . The required change was necessary to bring the
existing facility up to its rated capacity (90 Million Gallons/Day) and provide for added
future reliability.
Item 6 adds four 1-inch conduits (150 feet) that were not included in the Contract
Documents . The required change was necessary to provide a functional facility.
Item 7 re-routes existing signal conduit runs to support the first and fourth stage gas
detection analyzer systems . The Contract required use of an existing concrete encased
metal conduit system . The existing conduit was deemed non-useable due to excessive
corrosion . The additional required conduit was not shown on the Contract Documents.
Revised 06/04/03 Page 2
... ,
Item 8 relocates the existing Fiber Optic Panel located in the East RAS Pump Control
Room. The new location of the Fiber Optic Panel, as indicated in the Contract
Documents, interferes with existing panels. This relocation was required to improve
access for future maintenance of this panel.
Item 9 provides programming modification deemed necessary to better safeguard
pumping operations, prevent storm-event overflows, and provide additional monitoring
data to operations personnel. District staff required the design changes.
Item 10 replaces existing connedors and fittings for the aerator mixer motors. The
Contract Documents indicate re-use of the existing connectors. However, the existing
connectors are severely corroded. District staff required replacement of the connectors
in order to insure continuous reliable secondary treatment.
Item 11 replaces two existing gas monitoring systems which were not in the Contract
Documents. District staff required replacement of the obsolete devices in order to
provide a safer working environment.
Item 12 adds new aluminum cable tray under the Pump Control Rooms in order to
correct an existing condition at the activated sludge plant in Plant No. 2. The existing
condition violates current National Electrical Code (NEC) requirements. This Contract
requires replacement of existing cables within an existing cable tray system that is
already overloaded with cables. The additional tray was not indicated on the Contract
Documents.
Job Completion
The project is now 50% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on November 6, 2003. Please
refer to the attached Change Order Status Report for information on all previous
Change Orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price
Previously Authorized Changes
This Change (add)(ded1:1st)
Change Orders to Date
Percentage Increase to Date
Amended Contract Price
Revised: 06/04/03
$ 4,712,000
$ 0
$ 205,903
$ 0
4.37%
$ 4,917,903
Page3
BUDGET IMPACT
[gl This item has been budgeted. (Line item: Section 8 -Page 64)
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
None
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the Strategic Plan EIR that was certified on
October 27, 1999. A Notice of Determination was filed on October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
CH:dm
H:\ntglobal\Agenda Draft Reports\PDC\P247-03 AR CO #1 100704.doc
Revised· 06/04/03 Page4
Phase 1 -Project Development
Phase 2 -Preliminary Design $
Phase 3 -Oesian $
Phase 4 -Construction $
Phase 5 -Commissionina $
Phase 6 -Close-Out $
Phase 7 -Contingency $
PROJECT TOTAL
IRelmbursablo Costs
PROJECT NET $
Design PSA $
Construction Contract $
EDMS # 003752977
BUDGET INFORMATION TABLE
SECONDARY TREATMENT FACILITIES PROCESS UPGRADES AT PLANT NO. 2
P2-47-3
:, .'.'
$ $ -$
6,000 $ 6,000 $ 6,000 $ 6,000 $ -$ 6,000 $
677,002 $ 677,002 $ 677,002 $ 677,002 $ 677,002 $
6,697,000 $ 6,697,000 $ 6,697,000 $ 5,791,783 s 205,903 $ 5,997,686 $
158,906 $ 158,906 $ 158,906 $ -$
39,977 $ 39,977 $ 39,977 $ -$
1, 124.115 $ 1,124,115 $ 1,124,115 $ -$
:.
8.703,000 $ 8,703,000 $ -$ 8,703,000 $ 6,474,785 $ 205,903 $ 6,680,688 $
L',I
8,703,000 $ 8,703,000 $ 8, 703,000 . . $ 6,474,785 $ 6,680,688 $
PSA/Contract
637,709 $ 637,709 $ -$ 637,709 $ 637,709 s -$ 637,709 $
5,617,217 $ 4,712,000 s -$ 4,712,000 . $ 4,712,000 s 205,903 $ 4,917,903 $
259 0%
6,464 108%
663,983 98%
3, 117, 126 52%
3,537 0%
0%
0%
3,791,369 57%
0%
3,791,369 57%
654,224 103%
-0%
\ -
CHANGE ORDER STATUS REPORT
SECONDARY TREATMENT FACILITIES PROCESS UPGRADES AT PLANT NO. 2
ITEM APPROVAL
DATE
CONTRACT 11/6/2003
CON0.1 ._Pending
EDMS 003779884
CONTRACT
COST
$4,712,000
$~05,90~
JOB NO. P2-47-3
CONTRACT COST
TO DATE
PERCENTAGE
INCREASE
AUTHORIZED
TIME
(DAYS)
AUTHORIZED TIME
TO DATE
(DAYS)
$4,712,000 0.00 485 485
-
·o
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 1of9
Contractor: Morrow-Meadows Corporation C.O. No.: One (1)
Date: October 27. 2004
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee & Ro
Amount of this Change Order (Add)(QeeYst) $205.903.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 -DELETION OF BUILDER'S ALL RISK INSURANCE
This item credits the District for Builder's All Risk Insurance. The District's existing insurance policy
provides for Builder's All Risk for all projects under 1 O million dollars. Since this project is less than
1 O million dollars, the Contractor does not need to acquire Builder's All Risk Insurance. Language
contained in Section 31 of the Bid Documents (Schedule of Prices), states in part, "As cost control is
a major concern for the District, Contractor is required to provide a separate price (Bid Item No. 3) for
Builder's All Risk/Course of Construction Insurance ... which will be deducted if the District elects to
provide the course of construction coverage." District may, at its sole option, elect to delete this item
by Change Order and provide its own "All Risk" coverage as part of its Course of Construction
Insurance Reference is made to the District's Field Change Order No. 1, dated January 28, 2004.
CREDIT THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 2-ADDITIONAL RACKING AT scan AND HEADMAN TUNNELS
($20,000.00)
0 Calendar Days
This item is for labor and material required to provide additional racking under the east and west
RAS/WAS Pump Control Rooms and in the Scott and Headman Tunnels. The additional work
included; 700 feet of Yz-inch stainless steel rods, 600 feet of galvanized strut, 400 feet of slotted strut,
400 feet of extra deep slotted strut, 10 feet of double tiered deep strut, and miscellaneous anchors,
washers, and supports necessary to complete the installation. District's staff determined that
additional racking was required to facilitate enough headroom around the existing elevators in order
to move equipment for future maintenance needs, to allow access to valves, and meters, and to avoid
high voltage areas. The proposed modifications were not part of the original contract work. The costs
associated with Field Change Order No. 4 were negotiated with the Contractor pursuant with Division
1, Section 44.8.1 of the General Requirements. The costs associated with Field Change Order No. 7
were accomplished by the Contractor's force account pursuant with Division 1, Section 44.B.1 of the
General Requirements. Reference is made to the District's Request for Proposal dated, March 10,
2004. Reference is also made to the Contractor's Jobsite Cost Proposals, dated March 22, 2004 and
August 4, 2004, and Field Change Order Nos. 4 & 7, dated March 24, 2004 and April 8, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$36,597.00
O Calendar Days
Contrador:
Job:
Consultant:
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Morrow-Meadows Corporation C.O. No.:
Date:
Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Lee& Ro
ITEM 3 -RELOCATION OF EXISTING OUTLETS
Page2 of9
One (1)
October 27. 2004
This item is for labor, material, and equipment required to remove and relocate the three surface
mounted 120vac outlets and associated conduit runs from the east wall of the east side Return
Activated Sludge (RAS) Pump Control room to the south wall of the east side RAS Pump Control
room. This modification required an additional 90 feet of %-inch PVC coated aluminum conduit and
miscellaneous couplings, anchors, clamps and covers. This modification was required because the
existing outlets on the east wall interfered with the installation of new PLC and RIO cabinets indicated
on the contract drawings. This item was accomplished by the Contrador's force account in
accordance with Division 1, Section 44.B.1 of the General Requirements. Reference is made to the
Contractor's Jobsite Cost Proposal, dated July 29, 2004, and Field Change Order No. 3, dated
March 11, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 4 -FIBER OPTIC CABINET POWER CIRCUITS
$2,492.00
0 Calendar Days
This item is for labor, material, and equipment required to provide and install power circuits to each of
the following fiber optic cabinets:
-East Fiber Optic Cabinet
-West Fiber Optic Cabinet
-OASES Fiber Optic Cabinet
This requirement added 160 feet of %-inch PVC coated aluminum conduit, 540 feet of #12 wire, 100
feet of 3/8-inch stainless steel rods, and miscellaneous couplings, nuts, washers, and clamps needed
to complete the installation. Power Circuits (120 volt) were omitted from the contract documents for
the aforementioned Fiber Optic Cabinets. These power requirements were necessary to provide an
operational system. This item was accomplished by the Contrador's force account in accordance
with Division 1, Section 44.B.1 of the General Requirements. Reference is made to the Contractor's
Jobsite Cost Proposal, dated August 2, 2004, and Field Change Order No. 8, dated April 13, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$8,360.00
O Calendar Days
••
\
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 3of9
Contractor: Morrow-Meadows Corporation C.O. No.: One (1)
Date: October 27. 2004
Job: Secondary Treatment Facilities Process Uogrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee & Ro
ITEM 5-ADDITIONAL CABLES FOR AERATOR MOTORS
This item is for labor, material, and equipment required to provide and install one 12112 multi-
conductor cable for each of the aerator motors B1-84 and G1-G4 listed in the contract documents.
This requirement includes installation of 8,000 feet of 12/12C Tray Cable. In the Electrical and
Conduit Cable Schedule of the contract drawings, one 12112 multi-conductor cable is missing for each
of the aerator motors B1-84 and G1-G4. This item was accomplished by the Contractor's force
account in accordance with Division 1, Section 44.B.1 of the General Requirements. Reference is
made to the Contractor's Jobsite Cost Proposal, dated August 2, 2004, and Field Change Order No.
9, dated
April 13, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 6 -ADDITIONAL FIBER OPTIC CONDUIT
$28,551.00
0 Calendar Days
This item is for labor, material, and equipment required to provide and install four additional 1-inch
PVC coated rigid galvanized conduits that were not included in the contract documents. This change
order item required a total of 120 feet of 1-inch conduit necessary for the following cable runs:
West Secondary Clarifier Remote 110 to Patch Panel
West RAS/WAS Remote 110 to Patch Panel
West OASES Remote 1/0 to Patch Panel
Patch Panel to Work Station
In the Electrical and Conduit Cable Schedule of the contract drawings, four required conduits were
omitted from the contract documents. This item was accomplished by the Contractor's force account
in accordance with Division 1, Section 44.B.1 of the General Requirements. Reference is made to the
Contractor's Jobsite Cost Proposal, dated August 13, 2004, and Field Change Order No. 10, dated
April 13, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$6,026.00
0 Calendar Days
Contractor:
Job:
Consultant:
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Morrow-Meadows Corporation C.O. No.:
Date:
Secondary Treatment Facilities Process Uogrades at Plant No. 2
Job No. P2-47-3
Lee& Ro
ITEM 7 -GAS ANALYZER CONDUIT ADDITION
Page4 of9
One (1)
October 27. 2004
This item required the Contractor to abandon the existing signal conduits between the first and forth
stage gas detection analyzers and re-route the signal circuits from the first stage analyzer panels in
the tunnel to the forth stage remote 110 panel. The contract documents call for re-use of the existing
signal and control conduits between the first and forth stages of the Aeration Basins. The Contractor
was unable to remove the group of existing cables from their conduits embedded in the reactor deck.
This item directed the Contractor to abandon the existing conduit and route the new signal cables
through new conduits.
A summary of the major scope items is as follows:
1. Install 190 feet of 1-1/2-inch Gray PVC Coated Rigid Galvanized Conduit
2. Install 90 feet of 2-inch Gray PVC Coated Rigid Galvanized Conduit
3. Install 7200 feet of 16/2 twisted shielded cable tray rated wire
4. Miscellaneous electrical materials (wiring, couplings, straps, anchor, glue, etc ... )
5. Stainless steel conduit support system
This item was accomplished by the Contractor's force account in accordance with Division 1, Section
44.B.1 of the General Requirements. Reference is made to the Contractor's Jobsite Cost Proposal,
dated August 4, 2004, and Field Change Order No. 13, dated April 20, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 8-RELOCATE FIBER OPTIC PANEL
$35,660.00
0 Calendar Days
This item includes extra work that was necessary as a result of relocating the existing fiber optic panel
located in the east Return Activated Sludge Pump Control Room. The contract documents indicate a
new location of the existing fiber optic panel such that the doors will be difficult to access. District staff
has required the Contractor to relocate the existing fiber optic panel to improve access for future
maintenance of this panel. The costs associated with this change order were negotiated with the
Contractor pursuant with Division 1, Section 44.B.1 of the General Requirements. Reference is made
to the District's Request for Proposal dated, March 10, 2004. Reference is also made to the
Contractor's Jobsite Cost Proposal, dated March 29, 2004 and Field Change Order No. 5, dated
April 7, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$2,025.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: One (1)
Page 5 of9
Date: October 27. 2004
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee & Ro
Contractor:
Job:
Consultant:
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Morrow-Meadows Corporation C.O. No.:
Date:
Secondary Treatment Facilities Process Uoarades at Plant No. 2
Job No. P247-3
Lee& Ro
ITEM 9-PROGRAMMING MODIFICATIONS
Page 6 of9
One (1)
October 27. 2004
This item is for programming changes deemed necessary to better safeguard pumping operations,
prevent wet well overflow during peak flow events, and provide additional information for the CRISP
display summaries to operations staff in order to provide additional data for process monitoring and
control. The programming changes were not part of the original contract programming requirements.
A summary of the major scope items is as follows:
1. Addition of permissives for all Wlthdrawl and Return Valves running the Primary Effluent,
Return Activated Sludge, and Waste Activated Sludge Pumps. Additional programming to
SAT, CRISP Graphics, Technical Memorandum, Program Flowcharts, and PLC Programming
in the RAS/WAS PLC and Secondary Clarifier PLC. An additional 40 hours of programming
was required for this task.
2. Additional programming required to CRISP Graphics, Technical Memorandum, Program
Flowcharts, and the PEPS PLC to control Junction Box #1 Gate (22GAT250) on a HiHi wet
well level. An additional 30 hours of programming was required for this task.
3. Additional programming to add Thermal Flow Element Flows to the Flow Summary on CRISP.
Additional programming to CRISP, Technical Memorandum, Programming Flowcharts, and
PLC programming in the OASIS PLC. An additional 30 hours of programming was required
for this task.
The costs associated with this change order were negotiated with the Contractor pursuant with
Division 1, Section 44.8.1 of the General Requirements. Reference is made to the District's Request
for Proposal dated, April 15, 2004. Reference is also made to the Contractor's Jobsite Cost Proposal,
dated May 04, 2004 and Field Change Order No. 18, dated May 27, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$13,935.00
O Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 7 of9
Contractor: Morrow-Meadows Corporation C.O. No.: One (1)
Date: October 27. 2004
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee & Ro
ITEM 10-REPLACE SEAL TITE CONNECTORS ON THE AERATION MIXERS
This item is for labor, material, and equipment required to replace the 32 Seal Tite connectors and
fittings for the 32 Aerator Mixers located on the Aeration Basin Reactors. The contract documents
require the Contractor to reuse all conduit at all Aeration Basin Reactor Motors. The original
installation was in 1978. Due to excessive corrosion of existing conduit, District staff required the
Contractor to replace the connectors and fittings in order to provide for continuous reliable operation
of the aeration mixers. The costs associated with this change order were negotiated with the
Contractor pursuant with Division 1, Section 44.B.1 of the General Requirements. Reference is made
to the Contractor's Jobsite Cost Proposal, dated April 28, 2004 and Field Change Order No. 19, dated
June 07, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 11 -REPLACE TWO GAS MONITORING SYSTEMS
$30,929.00
O Calendar Days
This item is for labor, material, and equipment needed to replace two gas monitoring systems (under
the East and West Side Pump Control Rooms). Each system includes a horn, a beacon, and a gas
monitor. Pursuant to the Contract Documents, the Contractor is required to supply new conduit and
fittings to the two existing gas monitoring systems. However, the existing systems are obsolete and
parts are no longer available for repair. One of the gas monitoring systems is no longer functional as a
result of the unavailability of parts necessary to service the system. District staff requested to replace
the one non-functional monitoring system and the other obsolete unit to provide reliable future safety
monitoring. This item was negotiated with the Contractor in accordance with Division 1, Section
43.B.1 of the General Requirements. Reference is made to the Contractor's Jobsite Cost Proposal,
dated May 25, 2004 and Field Change Order No. 20, dated June 08, 2004.
ADDED COST THIS CHANGE ORDER ITEM: $12,219.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 8 of9
Contractor: Morrow-Meadows Corporation C.O. No.: One (1)
Date: October 27. 2004
Job: Secondary Treatment Facilities Process Uoarades at Plant No. 2
Job No. P2-47-3
Consultant: Lee & Ro
ITEM 12-ADDITIONAL CABLE TRAY UNDER THE PUMP CONTROL ROOMS
This item is for labor, material, and equipment needed to install 100 feet of (36-inch wide) aluminum
cable tray systems with stainless steel hardware under the existing pump control rooms. The cable
tray systems include straight sections of ladder type cable trays, bends, tees, barrier strips, elbows,
drop-outs, supports, and accessories. The contract documents require the Contractor to replace
existing Aeration Mixer Motor wiring located in existing cable trays. However, the existing
cable trays are overloaded and contain non-code single-conductor wires which must be re-routed and
replaced to make room for the Aeration Mixer Motor wiring. Additional Cable Tray capacity is needed
for Aeration Mixer Motor wiring in order to comply with the National Electrical Code (NEC). Project
J-47, the Cable Tray Upgrades project, will correct these deficiencies in most areas of the Treatment
Plants. These upgrades are needed now to correct the NEC Code violations, and to ensure reliable
secondary treatment. This item was negotiated with the Contractor in accordance with Division 1,
Section 43.B.1 of the General Requirements. Reference is made to the District's Request for Proposal
dated, June 30, 2004. Reference is also made to the Contractor's Jobsite Cost Proposal, dated
July 1, 2004 and Field Change Order No. 29, dated July 29, 2004.
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
TOTAL ADDED COST THIS CHANGE ORDER:
TOTAL TIME EXTENSION THIS CHANGE ORDER:
$49,109.00
O Calendar Days
$205,903.00
O Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS A VENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: One (1)
Page 9of9
Date: October 27. 2004
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee & Ro
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that no time extension is
required for this Change Order, and that no direct or indirect, incidental or consequential costs,
expenses, losses, or damages have been or will be incurred by Contractor, except as expressly
granted and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.0.:
Total Contract Time Extension:
Revised Contract Time:
Revised Final Completion Due Date:
Time Subject to Liquidated Damages:
Actual Final Completion Date:
November 6, 2003
485 Calendar Days
March 5, 2005
0 Calendar Days
0 Calendar Days
485 Calendar Days
March 5, 2005
Not Applicable
Not Applicable
Original Contract Price
Prev. Authorized Changes
This Change (Add) (Deduct)
Amended Contract Price
$4.712.000
$ 0
$ 205.903
$4.917.903
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Morrow-Meadows Corporation C.O. No.: One (1)
Page 10of9
Date: October 27. 2004
Job: Secondary Treatment Facilities Process Upgrades at Plant No. 2
Job No. P2-47-3
Consultant: Lee & Ro
Board Authorization Date: October 27, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Bob Schirripa
CIP Project Manager
Approved by:
David A. Ludwin P .E.
Director of Engineering
Accepted by:
MORROW-MEADOWS CORPORATION
Contractor
EDMS 003n9834
Date
Date
Date
w
'ii PDC COM MITIEE Meeting Date To Bd. of Dir.
10/07/04 10/27/04
AGENDA RE PORT Item Number Item Number
Orange County Sanitation D1stnct
FROM: David Ludwin , Director of Engineering
Originator: Dean Fisher, GIP Project Manager
PDC04-85
SUBJECT: TRICKLING FILTER REHABILITATION AND NEW CLARIFIERS,
JOB NO. P1-76
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 3 to Trickling Filter Rehabilitation and New Clarifiers , Job
No. P1-76 , with J.R. Filanc Construction Company, Inc., authorizing an addition of
$123 ,258, increasing the total contract amount to $33,075 ,853 .
SUMMARY
Background
13(f)
• Job Number P1-76 , Trickling Filter Rehabilitation and New Clarifiers, includes the
construction of two new t rickling filters and clarifiers , a pump station , a meter vault,
and all support equipment and piping .
• Black & Veatch prepared the plans and specifications and the contract was awarded
to J.R. Filanc Construction Company, Inc. on March 26, 2003.
• This change order includes ten items of additional work, and one item of deleted
work. There are no errors and two omissions associated with this change order.
Liquidated damages on t his project are $3,000 per day and there are no bonus
provisions .
Contract Schedule
Contract Start Date
Original Contract Completion Date
Total Number of Change Orders to Date
Current Contract Completion Date
Actual Completion Date
Days Subject to Liquidated Damages
H :\depllagenda\Board Agenda Reports\2004 Board Agenda Repons\1004\Uem 13(0.P1-76.doc
Revised . 6/04/03
June 2 , 2003
February 26, 2006
3
February 26 , 2006
N/A
N/A
Page 1
Change Order Content
Item Description Amount Days Type
No.
1 Pioe Lining Deletion (546 ,200) 0 Design Change
2 Uosize HVAC in Power Building 8 73, 171 0 Omission
3 Upsize Switchgear in Power 97,620 0 Design Change
Building 8
4 Pre-Cast Tie-Beam Coating 38,800 0 Omission
5 Pump Station Concrete Addition 13,797 0 Design Change
6 GWR Meter Vault Relocation 59,274 0 Design Change
7 Expanded P&IDs -SAT Update 4,892 0 Design Change
8 Plug Valve Upgrade 1,911 0 Design Change
9 Pile Driving Delay 23,797 0 Changed Condition
10 Pipe Extension at Junction Box 4 6 ,196 0 Changed Condition
11 Filtrate Pump Station Addition 350 ,000 0 Design Change
Total Change Order 123,258 0
Item 1 is for the deletion of a pipe liner from the contract documents. The contract
included a pipe lining system to be applied, if necessary, to an existing 72-inch
reinforced concrete pipe . Inspection of this pipeline was not reasonable during the
design phase due to plant operation constraints . After thoroughly investigating the
existing condition of the pipe, the lining is not required.
Item 2 increases the heating , ventilation , and air conditioning (HVAC) capacity in Power
Building 8. The Design Consultant reviewed the equipment heat demand values on the
contractor supplied equipment and found it was greater than the estimated heat
demand assumed during design . This upgrade was found during the shop drawing
process .
Item 3 increases the capacity of the electrical switchgear located in Power Building 8 .
District electrical engineering staff required this design change to accommodate future
needs and ultimate use of the contract supplied generator and transformers .
Item 4 involves the addition of a urethane coating to the concrete tie-beam located
within the trickling filters . The contract drawings required all other concrete surfaces
within the trickling filters to be coated, except for the tie-beam . This coating is required
to prevent premature concrete corrosion .
Item 5 involves additional concrete fillets to the pump station wetwells. The pump
manufacturer recommended this modification to reduce the likelihood of poor pump
performance .
Item 6 involves the relocation of the GWR Meter Vault in order to avoid conflict with the
future full secondary facilities and underground piping . The new location was not known
during the design phase and required shoring and a deeper vault which is not shown on
the contract documents.
Item 7 resulted from the expansion of the Process & Instrumentation Diagrams which
required the contractor to update the SCADA Administration Tool (SAT) database .
Update of the SAT database was not included in the contract documents but was
requested by staff based on the latest design criteria .
H·ldepl\agenda\Board Agenda Repons\2004 Boaid Agenda Reports\1004\llem 13(1) P 1-76.doc
Revised 6/04/03 Page 2
Item 8 upgrades the plug valve hardware to 316 stainless steel to minimize future
maintenance problems from corrosion. Plug valve stainless steel hardware is not
required in the contract documents.
Item 9 resulted from the need for three additional indicator piles for the trickling filter
area because three of the first indicator piles did not provide enough detailed
information. The geotechnical consultant for this project recommended the installation
of three additional piles to verify foundation design criteria for the new pile installations.
Costs involved with this item are associated with standby rental costs of equipment.
Item 10 extends the existing 72-inch reinforced concrete pipe into a new Junction Box.
When the existing junction box was removed it was found that the existing 72-inch pipe
was actually 2-feet shorter than shown on the contract drawings.
Item 11 of this change order is for the addition of a Filtrate Pump Station. The pump
station is required to reroute the filtrate into the 78-inch pipeline in Ellis Avenue which
conveys wastewater to Plant No. 2. This item is included as part of the P1-76 contract
because the filtrate was previously treated by the old trickling filters and then sent to the
interplant line and out the ocean outfall; the filtrate is now treated through the activated
sludge plant which sends a portion of its effluent to the Water District for water
reclamation. The Water District reclaimed water is regulated for NOMA and once the
filtrate was diverted through the activated sludge process, the Water District started
violating their NOMA permit. The filtrate needs to be rerouted to Plant No. 2 in order to
decrease the likelihood of permit violation for NOMA at the Water District. The pump
station is also required to allow for flexibility in the type of dewatering polymer used in
the solids dewatering process. This item will be completed as force account (time and
material). The costs are expected to be approximately $350,000. At the conclusion of
the Filtrate Pump Station construction, any additional costs will be presented in a future
change order.
Job Completion
The contract is 49% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on March 26, 2003. Please refer
to the attached Change Order Status Report for more information on previous change
orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price
Previously Authorized Changes
This Change
Change Orders to Date
Percentage Increase to Date
Amended Contract Price
H:\dept\agenda\Boan:I Agenda Repcl'ls\2004 Board Agenda Reports\1004\ltem 13(f}.P1-76.d0c
Revised: 6/04/03
$ 33,037,000
$ (84,405)
$ 123,258
$ 38,853
0.12%
$ 33,075,853
Page3
BUDGET IMPACT
~ This item has been budgeted. (Line item: Section a, CIP, P1-76)
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
None.
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
This project was included in the Strategic Plan EIR that was certified on October 27,
1999. A Notice of Determination was filed on October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
DF:BB:ba
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reparts\1004\Hem 13(f).P1·76.doc
Revised: 6/04/03 Page4
PROJECT/PHASE
Phase 1 -Proiect Develocment
Phase 2 -Preliminarv Design
Phase 3 -Design
Phase 4 -Construction
Phase 5 -Commissionina
Phase 6 -Close-Out
Phase 7 -Contingency
PROJECT TOTAL
!Reimbursable Costs
PROJECT NET
OesignPSA
Construction Contract
EDMSI003779819
$
$
$
$
$
$
$
$
BUDGET INFORMATION TABLE
TRICKLING FILTER REHABIL TATION AND NEW CLARIFIERS
JOB NO. P1-76
55,000 $ 55,000 $ 55,000 $
60,000 $ 60,000 $ 60,000 s -$
4,379,000 $ 4,379,000 $ 4,379,000 $
38,377,000 $ 123,258 $ 38,500,258 $ 38,377,000 $ 123,258 $
530,000 $ 530,000
89,000 $ 89,000
2.720,000 $ (123,258) $ 2,596,742
46,210,000 $ -$ 46,210,000 ' $ 42,871,000 $ 123,258 $
11
$ 46,210,000 s 46,210,000 ' $ 42,871,000 $
PSA/Contract
$ 6,196,938 $ -$ 6,196,938 . $ 6,169,938 $ -$
$ 32,952,595 $ 123,258 $ 33,075,853 $ 32,952,595 $ 123,258 $
55,000 $ 55,000 100%
60,000 $ 60,000 100%
4,379,000 $ 4,380,000 100%
38,500,258 $ 17,500,000 45%
42,994,258 $ 21,995,000 51%
42,994,258 $ 21,995,000 51%
6, 169,938 $ 4,450,000 72%
33,075,853 $ 16,000,000 48%
CHANGE ORDER STATUS REPORT
TRICKLING FILTER REHABILITATION AND NEW CLARIFIERS
JOB NO. P1-76
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM TIME TO DATE DATE COST TO DATE INCREASE (DAYS) (DAYS)
CONTRACT 3/26/2003 $ 33,037 ,000.00 $ 33,037,000.00 0.00 1000 1000
CO N0.1 7/17/2003 $ 0.00 $ 33,037,000.00 0.00 0 1000
CON0.2 6/23/2004 $ (84,405.00) $ 32,952,595.00 (0.26) 0 1000
CON0.3 10/27/2004 .: s , f:~,12a,2se.oo. $ . . 33,07:5.85,i'QQ. ,:. .· 0~12~~:r __ :(·/>,·. ~~:;§,\:::: : ,/;0' . \ . : . ' . :-. . ·., . ,-: 1000~
EOMS\003779817 •)
\
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 1of7
Contractor: J.R. Filanc Construction Company. Inc. C.O. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
Amount of this Change Order (Add}(DeEIYst)S123.258.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 -PIPE LINING DELETION
This item provides a net credit for the deletion of the specified cured in place pipe (CIPP) lining in the
existing 72-inch effluent pipeline. During the design phase of the new trickling filter facility it was
determined that use of an approximate 400-foot section of existing 72-inch reinforced concrete pipe
would be the most cost and time effective option. At the time the decision to reuse the pipe was made
the pipe was still in service and could not be dewatered for inspection. In order to make certain the
pipe could be reused, a pipe lining system was added to the contract in case the pipe needed to be
rehabilitated prior to reuse. A separate bid item was added to the contract bid documents which
required the contractor to list the price for the CIPP so it could be conveniently removed from the
contract if the decision was made to not line the pipe. After thorough inspection of the condition of the
existing pipe, it was determined the lining was not necessary. There are a few items within the
pipeline that need some rehabilitation but a complete pipe lining is not required. A future change
order will present the required pipe rehabilitation costs.
The cost associated with this Change Order item was determined by the amount written in by
contractor during the time of bidding on page 22 of 23 of the contract bid documents (Reference FCO-
P176-023).
CREDIT THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 2 -UPSIZE HVAC IN POWER BUILDING 8
$(546,200.00)
O Calendar Days
This item is to increase the capacity of the heating ventilation and air conditioning (HVAC) system to
be installed within Power Building 8. The increase of HVAC capacity is required in order to maintain a
consistent and acceptable temperature level for the sensitive electrical equipment located within
Power Building 8. The electrical equipment the contractor submitted on and obtained approval for
procurement has a higher heat demand than anticipated during the design phase of this project. The
contract documents include an HVAC system which was designed for average heat rated equipment.
The HVAC upsize includes the addition of a second condensing unit, increased size in the air
handling unit, an additional thermostat. increased capacity in the roof structural support system, and
all electrical and hardware required to complete the installation.
The costs associated with this Change Order item were negotiated with the Contractor pursuant
Section 43 (B) 1 of the General Requirements (Reference FCO-P176-021).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$73,171.00
0 Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page2 of7
Contractor: J.R. Filanc Construction Company. Inc. C.O. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
ITEM 3 -UPSIZE SWITCHGEAR IN POWER BUILDING 8
This item is for the increase of 480-volt switchgear capacity located within Power Building 8. The
contract documents include 480-volt switchgear which would have had enough capacity to support the
new facility but does not take full advantage of the available capacity in the standby generator or
transformers. The switchgear upsize will allow the entire electrical system within Power Building 8 to
be rated at essentially the same capacity and will not be limited by the 480-volt switchgear. The
contract documents include 480-volt switchgear rated at 2000-amps and this upgrade is for
switchgear rated at 3200-amps. An increase in switchgear capacity was requested by the District
electrical engineering staff to provide increased reliability and future capacity.
The costs associated with this Change Order item were negotiated with the Contractor pursuant
Section 43 (B) 1 of the General Requirements (Reference FCO-P176-018).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 4-PRE-CAST TIE-BEAM COATING
$97,620.00
0 Calendar Days
This item is for the addition of 95 mils of urethane coating on the poured in place concrete tie-beam
located within the trickling filters. The urethane coating is required in order to prolong the life of the
facility by protecting the concrete from corrosion. All other concrete surfaces within the trickling filters
which will be exposed to moist corrosive air are to be coated or lined per the contract documents.
The coating of the tie-beam was omitted from the contract documents.
The costs associated with this Change Order item were negotiated with the Contractor pursuant
Section 43 (B) 1 of the General Requirements (Reference FCO-P176-017).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 5 -PUMP STATION CONCRETE ADDITION
$38,800.00
0 Calendar Days
This item is for the addition of concrete within the pump wetwells of the new Trickling Filter Pump
Station. During the submittal process for the three new 400 horsepower trickling filter pumps the
pump manufacturer, Ruhrpumpen, recommended the addition of concrete within the wetwells to
reduce the risk of vortexing which can cause pumps to cavitate resulting in damage to the pump or
decreased pump longevity. Approximately 20 cubic yards of additional reinforced concrete will be
added to each of the three wetwells. This concrete was not included in the original contract
documents but was added to reduce the likelihood of future pump related problems.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 43 (B) 1 of the General Requirements (Reference FCO-P176-019).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$13,797.00
O Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 3of7
Contractor: J.R. Filanc Construction Company. Inc. C.O. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
ITEM 6 -GWR METER VAULT RELOCATION
This item is for the relocation and lowering of the GWR System Meter Vault which is included within
the contract documents. The original design of the GWR System Screening Facility which is located
on the west side of the existing activated sludge secondary treatment facility included a 96-inch
pipeline that passed through the open field located in the southwest area of Plant No. 1. The decision
by the Board of Directors to go to full secondary treatment requires a new activated sludge facility to
be constructed in the same area as the 96-inch pipeline. The 96-inch pipeline was relocated to run
parallel to the P1-76 provided 72-inch pipeline which conveys water to the GWR System Screening
Facility. In order to make room for the 96-inch pipeline the GWR System Meter Vault needed to be
relocated approximately 20 feet north and 25 feet east of the design location. The location within the
contract documents did not require any shoring for the construction of the GWR System Meter Vault.
The new location of the meter vault required approximately 70-feet of 39-feet long sheets of shoring to
be installed and removed along the eastern and northern sides of the meter vault. The relocation also
required the meter vault to be constructed approximately 1.5 feet deeper than is included in the
contract documents. This item is for the additional concrete and rebar required to lower the meter
vault and to install and remove shoring in order to protect existing utilities and roadways. These items
are not included in the contract documents. An additional change order item will be presented at a
later time which will include the costs associated with the realignment of the 72-inch pipeline provided
in this contract.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 43 (8) 1 of the General Requirements (Reference FCO-P176-024).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 7 -EXPANDED P&IDS-SAT UPDATE
$59,274.00
0 Calendar Days
This item is for additional labor and material required to make changes to the SCADA Administration
Tool (SAT) database used by the instrumentation and programming subcontractors. The District
decided to expand the project Process and Instrumentation Diagrams (P&IDs) at the beginning of the
construction phase rather than after construction is complete. The expansion of the P&IDs will enable
faster and more accurate review of the information provided by the subcontractors. The expansion of
the P&IDs will result in a net savings to District because of significant staff and consultant time
savings for reviewing and updating drawings. The updates to the SAT database are not in the
contract documents.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 43(8)1 of the General Requirements (Reference FCO-P176-016).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$4,892.00
0 Calendar Days
Page 6 of7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.R. Filanc Construction Company. Inc. C.0. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.O.:
Total Contract Time Extension:
Revised Contract Time:
Revised Final Completion Due Date:
Time Subject to Liquidated Damages:
Actual Final Completion Date:
June 2, 2003
1,000 Days
February 26, 2006
ODays
1,000 Days
1,000 Days
February 26, 2006
N/A
N/A
Original Contract Price
Prev. Authorized Changes
This Change (Add) (De~Yst)
Amended Contract Price
$ 33.037.000.00
$ (84.405.00>
$ 123.258.00
$ 33.075.853.00
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS A VENUE, P .0. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 3of7
Contractor: J.R. Filanc Construction Company. Inc. C.O. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
ITEM 6 -GWR METER VAULT RELOCATION
This item is for the relocation and lowering of the GWR System Meter Vault which is included within
the contract documents. The original design of the GWR System Screening Facility which is located
on the west side of the existing activated sludge secondary treatment facility included a 96-inch
pipeline that passed through the open field located in the southwest area of Plant No. 1. The decision
by the Board of Directors to go to full secondary treatment requires a new activated sludge facility to
be constructed in the same area as the 96-inch pipeline. The 96-inch pipeline was relocated to run
parallel to the P1-76 provided 72-inch pipeline which conveys water to the GWR System Screening
Facility. In order to make room for the 96-inch pipeline the GWR System Meter Vault needed to be
relocated approximately 20 feet north and 25 feet east of the design location. The location within the
contract documents did not require any shoring for the construction of the GWR System Meter Vault.
The new location of the meter vault required approximately 70-feet of 39-feet long sheets of shoring to
be installed and removed along the eastern and northern sides of the meter vault. The relocation also
required the meter vault to be constructed approximately 1.5 feet deeper than is included in the
contract documents. This item is for the additional concrete and rebar required to lower the meter
vault and to install and remove shoring in order to protect existing utilities and roadways. These items
are not included in the contract documents. An additional change order item will be presented at a
later time which will include the costs associated with the realignment of the 72-inch pipeline provided
in this contract.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 43 (B) 1 of the General Requirements (Reference FCO-P176-024).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 7 -EXPANDED P&IDS -SAT UPDATE
$59,274.00
0 Calendar Days
This item is for additional labor and material required to make changes to the SCADA Administration
Tool (SAT) database used by the instrumentation and programming subcontractors. The District
decided to expand the project Process and Instrumentation Diagrams (P&IDs) at the beginning of the
construction phase rather than after construction is complete. The expansion of the P&IDs will enable
faster and more accurate review of the information provided by the subcontractors. The expansion of
the P&IDs will result in a net savings to District because of significant staff and consultant time
savings for reviewing and updating drawings. The updates to the SAT database are not in the
contract documents.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 43(B)1 of the General Requirements (Reference FCO-P176-016).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$4,892.00
O Calendar Days
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page4 of7
Contractor: J.R. Filanc Construction Company. Inc. C.O. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
ITEM 8 -PLUG VALVE HARDWARE UPGRADE
This item is for the upgrade of exposed nut, bolt, and washer hardware for 23 eccentric plug valves
from zinc plated to 316 stainless steel. This upgrade will increase the longevity and maintenance
interval of the plug valves. This item will result in a net savings to District because of reduced
maintenance costs, process shutdown time, and reduction of corrosive failure to the plug valves. The
316 stainless steel nuts, bolts, and washers are not included in the contract documents.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 43 (B) 1 of the General Requirements (Reference FCO-P176-022).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 9-PILE DRIVING DELAY BASED ON INDICATOR PILES
$1,911.00
0 Calendar Days
This item is for the cost impact to the contractor's pile driving subcontractor, Foundation Pile, for
installing a second set of indicator piles. After the initial installation of indicator piles at the trickling
fitters there was not enough geotechnical information available to determine the lengths for the 556
trickling filter piles. The second set of indicator piles required the construction of three new 70-feet
long piles which resulted in Foundation Pile's equipment to sit idle for one month. It took one month
to construct, cure, install, and evaluate the 3 new indicator piles. The costs for this item include one
month rental of the hydraulic hammer and costs for the pile driving rig. Through partnering efforts the
District and contractor were able to negotiate a no time impact to the contract. The contract
documents include one round of indicator piles. The second round of indicator piles was not included
in the contract documents.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 43(B)1 of the General Requirements (Reference FCO-P176-025).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
ITEM 10-PIPE EXTENSION AT JUNCTION BOX 4
$23,797.00
0 Calendar Days
This item is for all material, labor, and equipment required to extend a portion of the existing 72-inch
trickling filter effluent line into Junction Box 4. The contract documents show the existing 72-inch line
extending further than was found after the demolition of the old secondary clarifier distribution box. A
short section of 72-inch pipe will be installed in the gap between the existing pipe and Junction Box 4
and a concrete collar will be poured around the connection to make it structurally sound and water
tight. This work was not included in the contract documents.
The costs associated with this Change Order item were negotiated with the Contractor pursuant to
Section 43 (B) 1 of the General Requirements (Reference FCO-P176-26).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
$6,196.00
O Calendar Days
-,
•.
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 5 of7
Contractor: J.R. Filanc Construction Companv. Inc. C.O. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
ITEM 11 -FILTRATE PUMP STATION ADDITION
This item is for the installation of a new pump station to be located in the same area as the
demolished trickling filter pump station. Work will include the installation of a manhole type pump
station with two 30-Hp submersible pumps, approximately 600-feet of ten-inch diameter buried and
encased ductile iron pipe, a six-inch magnetic flow meter, a valve box, shoring required to protect
existing utilities, and all required electrical and instrumentation needed to fully support the pump
station. The 10-inch pump station effluent line will tie into and utilize a portion of the 8-inch secondary
clarifier sludge line which was scheduled to be removed as part of the P1-76 contract. Work will
proceed on a time and material basis. The minimum cost expected to complete the construction is
approximately $350,000. At the completion of the pump station construction any additional costs for
this item will be presented in a future change order.
The work will be accomplished on contractor's force account pursuant to Section 43 (B) 2 of the
General Requirements (Reference FCO-P176-20).
ADDED COST THIS CHANGE ORDER ITEM:
TIME EXTENSION THIS CHANGE ORDER ITEM:
TOTAL ADDED COST THIS CHANGE ORDER:
TOTAL TIME EXTENSION THIS CHANGE ORDER:
$350,000.00
0 Calendar Days
$123,258.00
0 Calendar Days
Additional work contained in this Change Order can be performed incidental to the prime work and
within the time allotted for the original Contract and any extensions to the Contract time made by this
and all previously issued Change Orders. It is therefore mutually agreed that no extension of time to
perform the work is required for this Change Order. District and Contractor agree that the added cost
described above constitutes full and equitable consideration for all the impacts incurred by the
Contractor, and no other direct or indirect, incidental or consequential costs, expenses, losses or
damages have been or will be incurred by Contractor, except as expressly granted and approved by
this Change Order.
Page 6 of7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.R. Filanc Construction Company. Inc. C.O. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
SUMMARY OF CONTRACT TIME
Original Contract Date:
Original Contract Time:
Original Completion Date:
Time Extension this C.O.:
Total Contract Time Extension:
Revised Contract Time:
Revised Final Completion Due Date:
Time Subject to Liquidated Damages:
Actual Final Completion Date:
June 2, 2003
1,000 Days
February 26, 2006
ODays
1,000 Days
1,000 Days
February 26, 2006
N/A
N/A
Original Contract Price
Prev. Authorized Changes
This Change (Add) (QedY6t)
Amended Contract Price
$ 33.037 .000.00
$ (84.405.00)
$ 123.258.00
$ 33.075.853.00
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Page 7 of7
Contractor: J.R. Filanc Construction Company. Inc. C.O. No.: Three (3)
Date: October 27. 2004
Job: Trickling Filter Rehabilitation and New Clarifiers. Job No. P1-76
Consultant: Black & Veatch
Board Authorization Date: October 27, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
John D. Linder, P.E.
Construction Manager
Approved by:
David A. Ludwin, P.E.
Director of Engineering
Accepted by:
Date
Date
J. R. FILANC CONSTRUCTION COMPANY, INC.
Contractor Date
EDMS/003n9821
PDC COMMilTEE
AGENDA REPORT
Orange County Sanitation District
FROM: Dave A. Ludwin, Director of Engineering
Originator: Alberto Acevedo, Project Manager
SUBJECT: PLANT N0.1-PLANTWATER VFD REPLACEMENT
JOB NO. SP-94
GENERAL MANAGER'S RECOMMENDATION
Meeting Date To Bel. of Dir.
10/7/04 10/27/04
Item Number Item Number
PDC04-86 13Ca)
Approve Amendment No. 1 to the Professional Services Agreement with SPEC
Services, Inc. for Plant No. 1 Plant Water VFD Replacement, Job No . SP-94, providing
for additional engineering services for an additional amount of $26 ,384 .58 , increasing
the total amount not to exceed $115,863.58.
SUMMARY
• This Amendment to the project upgrades or replaces many existing electrical
equipment items associated or located near the original project to replace the Plant
Water VFD equipment. During the presentation of Design Submittal "DS-1" to
District staff (Workshop WS-1), staff recommended the demolition of the existing
Programmable Logic Controller (PLC) -Remote Input/Output "RIO" panel
(17CFP001).
• The decision to replace this panel was supported by the fact that the PLC hardware
is based on outdated technology with very limited technical support and the input
cards are no longer manufactured. The District does not stock any hardware for this
equipment in the warehouse.
PRIOR COMMITTEE/BOARD ACTIONS
Please see the attached PSA Status Report .
PROJECT/CONT RACT COST SUMMARY
Approval of Amendment No . 1 is being requested in the amount of $26,384 .58, as
shown in the attached Budget Information Table. Authorization of this amount is w ithin
the project's budget for preparation of the Final Design for FY2004/05. The total budget
of $2,224 ,000 will not change. To accurately account for cost, it was necessary to
transfer $10,000 from Phase 3-Design to Phase 1-Project Development ($2,000) and
Phase 2-Preliminary Design ($8,000). Please see the attached Budget Information
Table .
Page 1
BUDGET IMPACT
[gJ
D
D
D
This item has been budgeted . (Line item : Section a, Page 99)
This item has been budgeted, but there are insufficient funds .
This item has not been budgeted.
Not applicable (information item)
ADDITIONAL INFORM ATION
The Board of Directors awarded a PSA to SPEC Services, Inc. at the May 2004
meeting. The original design Scope of Work called for completion of a Baseline Survey
and Data collection ; preparation of the Design to replace the Plant Water VFD
equipment; preparation of an update to existing Engineering Drawings and project
related documents; and preparation of Bid Documents. ·
This Amendment No. 1 will permit the demolish ing and replacement of the existing
Remote Input/Output panel (RI0-17CFP001) and associated electrical & controls , and
communications system appurtenances related to the Plant Water VFD units. The
existing PLC unit is based on the outdated Modicon technology 800 series. Modicon
provides very limited technical support for this equipment at this time, and the District's
warehouse no longer stocks hardware replacement or spare parts for these units .
The need to remove and replace this RIO panel was identified during the DS-1 submittal
workshop. Accomplishing the work under this project will provide the potential for
considerable savings in the design of Project P1-82 . A detailed list of the design
elemen t s to be completed under this Amendment No . 1 is attached in the Proposal
letter from SPEC Services, Inc. dated September 7, 2004.
ALTERNATIVES
No alternatives are proposed .
CEQA FINDINGS
This project is exempt per CEQA and District Guidelines, Section 15301 (B). A Notice
of Exemption was filled with the County of Orange on May 6 , 2004 .
ATTACHMENTS
1 . Budget Table
2 . PSA Status Report
3 . Proposal Letter from SPEC Services , Inc . dated September 7 . 2004 .
AAC :eh
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1004\ltem 13(g).SP-94.doc
Page 2
$ 30,000 $
Phase 2 -Prellmine $ 86,829 $
Phase 3 -Desi n $ 341,950 $
Phase 4 -Construction $ 1,553,891 $
Phase 5 -Commissionin $ 61,829 $
Phase 6 -Closeout $ 22957 $
Cantin enc $ 236 583 $
PROJECT TOTAL $ 2,334,039 $
'Reimbursable Cos1s
PROJECT NET $ 2,334,039 $
OesignPSA $
Construction Contract $
EOMS: 003780279
BUDGET INFORMATION TABLE
PLANT NO. 1 PLANT WATER VFD REPLACEMENT
JOB NO. SP-94
(AMENDMENT NO. 1)
-$ 2,000 $ -* :<·;
2,000 $ 8,000 $ 10,000 $ 2,000 $ )•j.' . ~ ..
345,000 s 10,000 $ 335,000
·;.~:
$ 289,479 s
:·1
1,554,000 $ 1,554,000 $ ..
··; ..
63,000 $ 63000 ~· $
23,000 $ 23,000
: .. ''
$ •::".
:''
237,000 $ 237000 .-; $
'...><\ ·,!',
2,224,000 $ -$ 2,224,000 ;, $ 291,479 •
rm
2,224,000 $ 2,224,000 $ 291,479 $
89.479 s 26385 $ 115.864 ;,7. $ 89,479 s
-~~
1,182,916 $ 1,182,916 '.r ·°':l!.
-$ -$ 1,430 0%
-$ 2,000 $ 9,655 483%
28,385 $ 315,864 $ 5,344 2%
$ -$ 0%
$ -$ 2,340 0%
s 0%
$ s 0%
28,385 $ 317,864 $ 18,769 6%
26,385 $ 317,864 0%
28.385 $ 115,864 0%
s -$ -0%
Professional Services Agreement Status Report
Plant No. 1 Plant Water VFD Replacement
Job No. SP-94
Total Project Budget: $2,334,039
Consultant: Spec Services, Inc.
Start Date of Project: 6/30/2004
Date Addendum Description
07/15/04 Original Engineering Design Services for Plant No. 1
PSA Plant Water VFD Replacement
Additional work to demolish and replace
10/27/04 1 associated Remote Input/Output (RIO) Panel
17CFP001
EOMS 003751887
Cost Accumulated
Costs
$ 89,479 $ 89,479
$ 26,385 $ 115,864
PDC COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Ann Tobin, Engineer
Meeting Date
10/07/04
Item Number
PDC04-8 7
SUBJECT: COOPERATIVE PROJECTS GRANT PROGRAM, JOB NO . J-73
GENERAL MANAGER'S RECOMMENDATION
To Bel. of Dir.
10/27/04
Item Number
13(h)
(1) Approve time extensions to Cooperative Projects Grant Program contracts with the
Cities of Anaheim (Contract Nos. 0202, 0301, and 0302) and Orange (Contract
No. 0130); and (2) Approve fund i ng for Cooperative Projects for Fiscal Year 2004-05 ,
totaling $2,386,537, as recommended by the Cooperative Projects Grant Committee .
SUMMARY
• The Cooperative Projects Grant Program (Program) provides funds to local agencies
for projects that reduce or eliminate inflow and infiltration (I/I) to the sewer collection
system .
• Time extensions are required for four existing contracts due to local agency project
delays.
• At its meeting of September 7, 2004 , the Cooperative Projects Grant Committee
reviewed 19 grant applications from 13 agencies and recommended Orange County
Sanitation District (District) funding for 17 Cooperative Projects for Fisca l Year
2004-05 .
PRIOR COMMITTEE/BOARD ACTIONS
On May 26 , 2004, the Board of Directors (Board) approved additional funding of
$43,000, under Contract No . 0108 , with the City of La Habra, increasing total Program
funding since inception to an amount not to exceed $18 ,794,736. At the same time , the
Board approved a t ime extension to this Contract No. 0108 .
On July 21 , 2004, the Board approved (1) time extensions to Contract No . 0205 with the
City of Fullerton and Contract No. 0129 with the City of Orange ; and (2) additional
funding of $21 ,750 under Contract No . 0108 with the City of La Habra. Total Program
funding s i nce inception was increased to an amount not to exceed $18,816 ,486.
Pag e 1
PROJECT/CONTRACT COST SUMMARY
At this time, additional funding of $2 ,386 ,537 is being requested for Fiscal Year 2004-05
Cooperative Projects. If approved, the total approved funding for contracts under the
Program will increase from $18 ,816,486 to $21,203,023 . For recommended projects,
see attached table entitled "Recommendations for FY 2004-05 funding ."
BUDGET IMPACT
[8J This item has been budgeted . (FY2004-05 sections, p . 12)
D This Item has been budgeted , but there are insufficient funds.
D This Item has not been budgeted .
D Not applicable (information item)
The total budget for the Program , Job No. J-73, was reduced from $142 ,675,600 to
$72,000,000 in FY 2003-04. The remaining budget will be spent over the next 15 years
on projects that reduce inflow and infiltration (I/I) in the District's service area .
Authorization for $2,386,537 is being requested as shown in the attached Budget
Information Table .
ADDITIONAL INFORMATION
Time Extensions
AGENCY CONTR.ACT APPROVED NEW NEW AMEND REASON FOR
NO. COMPLETE COMPLETE INVOICE NO. REQUEST
DATE DATE DATE
More time needed to
Anaheim CP-0202 07130104 05/31 /05 06/30/05 1 complete inspection
and planning.
More time needed to
Anaheim CP-0301 04130104 09/30/04 10/31/04 1 prepare final flow
monitoring report.
Consultant contract
Anaheim CP-0302 05/01/05 12101 /05 1210 1/06 1 to be awarded 0 1105 .
More time needed to
Orange CP-0130 11/15/04 11/15/05 12115/05 2 coordinate with utility
companies
Recommended Grant Funding for Fiscal Year 2004-05
On August 16 , 2004, the District received grant applications for 19 projects from 13
agencies . The attached Application Summary provides a brief description and analysis
of each proposed project. Based on the project analysis and Program objectives,
District staff ranked projects .
The highest ranking was given to projects that would provide cost-effective reduction in
111 . Second highest ranking was given to projects that would improve effectiveness of
sewer management and potential I/I reduction . Third highest ranking was given to
sewer lining projects that did not meet the Program 's 20-year payback criteria , but could
provide potentially significant I/I reduction . The lowest ranking was given to a sewer
lining projects with insignificant I/I reduction . On September 7 , 2004 , the Cooperative
Page 2
Projects Grant Committee reviewed the project applications and recommended funding
for 17 of the projects.
For the sewer lining projects proposed by the Cities of Buena Park and Huntington
Beach, the Committee recommended a two-part approval process with an initial flow
monitoring requirement to verify infiltration rates. District staff has contacted
engineering staff at the Cities of Buena Park and Huntington Beach to explain the flow
monitoring requirement and the 20-year payback criteria. Once the Cities of Buena
Park and Huntington Beach have verified the infiltration rates for the pipes to be lined,
they will revise their applications to meet the 20-year payback criteria and program
budget limits. These applications will be resubmitted for consideration by the
Cooperative Projects Grant Committee at a future date.
ALTERNATIVES
1. Do not approve time extensions. Not approving the time extensions would prevent
the City of Anaheim from collecting reimbursement for Contract Nos. 0202, 0301, and
0302 and the City of Orange from collecting reimbursement for Contract No. 0130.
2. Do not approve Fiscal Year 2004-05 grant funding for new Cooperative Projects.
Withholding grant funding may limit the agencies in initiating the proposed projects or
may limit the scope of the proposed projects.
CEQA FINDINGS
Local agencies are responsible for CECA compliance.
ATTACHMENTS
1. Recommendations for FY 2004-05 Grant Funding
2. Budget lnfonnation Table
3. Cooperative Projects Grant Program Application Summary for FY 04/05
JDH:AT:sa
H:\ntglobal\Agenda Draft Reports\PDC\PDC AR 100704 J-73.doc
Page3
J-73 Cooperative Projeds Grant Program
Recommendations for FY 2004-05 Funding
OCSD PRELIM APP# AGENCY PROJECT TITLE
RANK SCORE
1 174 4 Costa Mesa SD CCTV
1 50 9 Fullerton Manhole Replacement
1 75 12 La Habra Smoke Testing/Flow Isolation/Flow Monitoring
1 175 14 Midway City SD 87 Urgent Repairs and Improvements
1 175 16 Sunset Beach SD Condition Assessment and Rehab
2 50 1 Anaheim Flow Analysis of East Anaheim Sewer System
2 100 3 Buena Park CCTV
2 50 5 Fountain Valley CCTVand FM
2 50 6 Fullerton Flow Monitoring
2 50 7 Fullerton Master Plan
2 85 8 Fullerton CCTV
2 100 10 Garden Grove SD CCTV
2 100 13 La Palma Master Plan
2 100 15 Santa Ana CCTV
2 25 17 Villa Park CCTV Condition Evaluation
2 25 18 Villa Park Sewer System MacDing Program
3 50 2 Buena Park 1 Sewer Lining
3 50 11 Huntington Beach 1 Hamilton/Banning Sewer Lining
4 25 19 Villa Park2 Sewer Lining
OCSD Rank
1 Feature cost-effective 111 redudion
2 Improve effectiveness of sewer management and potential 111 reduction
3 Do not meet 20-year payback criteria, but 1/1 reduction may be significant
4 Do not meet 20-year payback criteria, I/I redudion probably insignificant
Footnotes
1 Recommend two-part accroval with flow monitoring requirement
2 Rejected due to poor payback for OCSD
EDMS:3780637
AMOUNT RECOMMENDED
REQUESTED FUNDING
$310,591 $310,591
$62,965 $62,965
$108,634 $108,634
$212,000 $212,000
$245,000 $245,000
$125,000 $125,000
$33.447 $33.447
$300,000 $300,000
$100,000 $100,000
$170,000 $170,000
$158,400 $158,400
$250,000 $250,000
$73,000 $73,000
$150,000 $150,000
$34,500 $34,500
$28,000 $28,000
$202,068 $0
$756,901 $25,000
$140,500 $0
Total $3,461,008 $2,386,637
9/30/2004
f'ROJECTIPHASE
ORIGlNAi. _
AUiiiORIZEti :
BUDGET
BUDGET INFORMATION TABLE
COOPERATIVE PROJECTS GRANT PROGRAM
JOB NO. J-73
,_P_ha_s_e_1 _-P_r_.oi ..... ect_o_e_v_el __ op1m_e_nt--+_s __ 14_2 ...... 67_5 ..... 6_00-+-s __ 1_2 ...... o_oo ..... o_o_o-t-____ ..,._.s __ 1_2 ..... oo_o ...... o_oo..... s 18.816,486 s 2,388,537 $
Phase 2 -Preliminary Design
Phase 3 -Desian
Phase 4 -Construction
Phase 5 -Commissioning
Phase 6 -Close-Out
Phase 7 -Contim1encv
PROJECT TOTAL
!Reimbursable Coals
PROJECT NET
IDesignPSA ~onstrucllon Contract
AT:sa
EDMS 003780636
$ 142,675,600 $ 72,000,000 $ 72,000,000 I:: $ 18,816,486 $ 2,386,537 $
$ 142,675,600 s 72,000,000 2,386,537 $
PSA/Contract
21,203,023 s 7,500 760 35%
21,203,023 s 7,500,760 35%
21,203,023 $ 7,500,760 35%
;
PDC COMMIITEE
AGENDA REPORT
Orange County Sanitation District
FROM: David A . Ludwin , Director of Engineering
Originator: Alberto Acevedo, Project Manager
SUBJECT: REHABILITATION OF DISTRICT SIPHONS
CONTRACT NO . 2-68
GENERAL MANAGER'S RECOMMENDATION
Meeti ng Date To Bel . of Dir.
10/07/04 10/27/04
Item Numbe r Item Number
PDC04-88 13(i)
Approve Professional Services Agreement with Dudek & Associates , Inc. for
engineering services for the Rehabilitation of District Siphons, Contract No . 2-68 , for
an amount not to exceed $987, 156.
SUMMARY
• This project will rehabilitate 16 of the 87 siphons owned by the District within the
service areas. The rehabilitation includes the hydraulic evaluation of the 16 siphons
with respect to sewage flow capacity and ventilation requirements . This work also
includes the inspection of the facilities for structural integrity and the des ign of a new
or a modffied vent line (Air Jumper).
• The Professional Services Agreement (PSA) includes the following :
1. Preparation of a Prel iminary Design Report (PDR) to include a series of technical
memoranda to set the design parameters, complete a util ity research effort,
perform a hydraulic system analysis , routing and sizing of the required or
modified vent p i peline (Air Jumper), complete an odor assessment and control
plan and determination of the most viable method of construction for each air
vent.
2. Final design of the recommended features .
3. California Environmental Quality Act (CEQA) and permit support services .
4 . Preparation of construction bid documents.
5. Bid and Award support services.
6. Estimated Engineering support services during construction , which will be
adjusted once the actual scope and cost of construction are known .
• The District so l icited proposals from five consulting firms including : Boyle
Engineering, Inc.; Dudek & Associates , Inc.; Jacobson Helgoth Consultants ;
PBS&J ; and Water 3 Engineering . A pre-proposal meeting was held on August 10,
2004 to present the project objectives and to answer questions or concerns from
H:ldeptlagenda\Board Agenda Reports\2004 Board Agenda Reports\1004\llem 13(i).2.06.doc
Revised· 06/04/03 Page 1
potential proposers. Water 3 Engineering declined to submit a proposal and Boyle
did not submit a proposal. PBS&J entered into an agreement to team with
Jacobson Helgoth Consultants . The District received two proposals on the due
date of August 26, 2004
• The Evaluation T earn evaluated the two proposals and recommends award of the
PSA to Dudek & Associates, Inc . for an amount not to exceed $987, 156.
PRIOR COMMITTEE/BOARD ACTIONS
Please see the attached PSA Status Report
PROJECT/CONTRACT COST SUMMARY
A total authorization of $987, 156 is within the project's budget for preparation of the
PDR and Final Design for FY2004/05. The total project budget of $5,731,000 will not
change. In order to have a sufficient budget for the completion of Phase 2-Prelimnary
Design, and Phase 3-Design , it was necessary to transfer $560 ,000 from Phase 4-
Construction into Phase 2-Preliminary Design ($260,000) and into Phase 3-Design
($300,000) to accurately account for costs . Please see attached Budget Information
Table .
BUDGET IMPACT
[gl This item has been budgeted . {Line item: Section 8, Page 16)
D This item has been budgeted , but there are insufficient funds.
D This item has not been budgeted .
D Not applicable (information item)
ADDITIONAL INFORMATION
The Orange County Sanitation District (District) lists a total of 87 siphon facilities within
the service area . Thirty-seven of these facilities are not vented (no air jumper), and
some have a deficient ventilation system , creating problems related to corrosion and/or
odor emissions . The Air Quality Division has ranked these facilities based on the
number of odor complaints received from the public. These "short-listed " siphons are
considered "Hot Spots" with respect to repair/rehabilitation priority.
In October, 2003 , the District completed a Collection System Siphon Assessment Field
Study to further identify those facilities in need of rehabilitation and to assess the level
of urgency to implement the repairs. The study focused on 23 siphons. The final report
was submitted to the District on February 17, 2004.
H ldeptlagenda\Board Agenda Repons\2004 Board Agenda Repor1 s\1004\tte m 1 3(1).2-68.doc
Revised 06/04/03 Page 2
•
~·-. ..
r
,_-
The project will perform a hydraulic evaluation of 16 District siphons with respect to
sewage flow capacity and ventilation requirements. The project will provide for the
design and construction of an adequately-sized air vent/air jumper for each of those
siphons.
The submerged portion of each siphon shall be inspected by the Consultant to
determine structural integrity and solids deposition. The Consultant shall propose
alternative technologies to perform this task. The siphon vent line/air jumper, if existing,
shall be inspected using Closed-Circuit Television (CCTV) technology.
Consultant shall evaluate the structural condition of the siphon structure and any
immediate facility less than 10-feet distant (i.e., siphon inlet and outlet structures) and
recommend required rehabilitation methods if necessary.
Temporary flow monitoring will be performed to determine existing flows, which will be
evaluated with respect to design flows projected in the District's 1999 Strategic Plan.
Siphons already possessing air vents will be evaluated for required vs. available
ventilation capacity.
Selection and construction of the preferred routing shall take into consideration issues
related to public concerns such as traffic, landscaping requirements, odors, safety and
environmental impacts, and mitigation measures.
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
This project was not included in the District's 1999 Strategic Plan Program
Environmental Impact Report that was certified in October, 1999. However, the
Rehabilitation of District Siphons will be filed as a Notice of Exemption at the County
Clerk's office.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Proposal Evaluation Report, September 11, 2004
AAC:ba
H:\depl\agenda\Board Agenda Reports\2004 Board Agenda Rep0f1s\1004\llem 13(i).2-68.doc
Revised· 06104103 Page3
PROJECTIPHAS&
Phase 1 -Proiect Development $
Phase 2 -Preliminary Deslan $
Phase 3 -Deslan s
Phase 4 -Conslrudlon s
Phase 5 -Commlsslonina $
Phase 6 -Close-Out $
Phase 7 -Contlnaencv s
PROJECT TOTAL s
IRelmbursable Costs
PROJECT NET $
DeslanPSA
Construction Contract $
EOMS: 0037802a.
ORIGIHAl.
AUTffORl!Ei;
bUDGET
70,000
110.000
632,000
4,073,000
110,000
34,000
702,000
5,731,000
5,731,000
3,511,000
$ 70,000
s 108,000
$ 632,000
$ 4,073,000
$ 111,000
$ 35,000
$ 702000
s 5,731,000
$ 5,731,000
$ 987,156
$ 3,511,000
s
s
$
s
s
$
s
BUDGET INFORMATION TABLE
REHABILITATION OF DISTRICT SIPHONS
CONTRACT NO. 2-68
',' .·.·.,. ;:
s 70,000 s 70,000
260000 s 368,000 s 72,800
300000 s 932,000 s 208,600
(560,000] $ 3,513,000 $ -
$ 111.000 $ .
$ 35,000 $ -
s 702,000 s -
. s 5,731,000 . $ 351,400
LI
5,731,000 : s
PSA/Contract
-$ 987,156
-$ 3,511,000
2-68 Budget Table.xis
)::; " '. ·.
•f ·-~ ~
$ -s 70,000 $ 47,400 68%
s 285.856 $ 358,456 s 18,158 5%
s 701.500 $ 910,100 $ 234 0%
s -$ -$ #DIV/DI
s -s -s #DIV/DI
$ -$ -s #DIV/01
s -$ -$ #DIV/01
s 987,156 $ 1,338,556 $ 65,792 5%
987,158 s 65,792 5%
s 987.156 $ 987,158
s . $ -
9130/2004
Professional Services Agreement Status Report
REHABILITATION OF DISTRICT SIPHONS
CONTRACT NO. 2-68
Total Project Budget: $ 5,731,000.00
Consultant: DUDEK & ASSOCIATES, INC
Start Date of Project: October 27, 2004
Date Amendment Description
Pending Original PSA Coast Trunk Sewer Rehabilitation
2-68 PSA Status Report.doc
EDMS 003780205
Cost Accumulated
Costs
$987,156. $987, 156.
09/30/04
,, .. ., .'
REHABILITATION OF DISTRICT SIPHONS
CONTRACT NO. 2 -68
September 11, 2004
Proposal Evaluation Report
Request for Proposals (RFPs) were sent on July 29, 2004 to the following consulting
firms:
• Boyle Engineering, Inc.
• Dudek & Associates, Inc.
• Jacobson Helgoth Consultants
• PBS&J
• Water 3 Engineering
The five firms had representatives attend the mandatory pre-proposal meeting
scheduled on August 10, 2004. Water 3 Engineering submitted a letter dated August 5,
2004 to decline the presentation of a proposal, this letter was received on August 10,
2004. PBS&J enter into a teaming agreement with Jacobson Helgoth Consultants, and
Boyle Engineering did not submit a proposal. The District received proposal from
Dudek & Associates, Inc., and from Jacobson Helgoth Consultants on the due date of
August 26, 2004. An Evaluation Team was selected to review and evaluate proposals
the week of August 30, 2004. Each member of the in-house review panel individually
reviewed and ranked the proposals. The review panel consisted of six District members.
Each proposal was graded from 1 to 10 (1 O being best) in six weighted categories as
described below:
1. Project Approach and Understanding of the Scope of Work (Weight 10) -
Rates the team's understanding of the Scope of Work included in the RFP and
their approach to the work, methodology, and task breakdown.
2. Plan for Managing and Performing the Work (Weight 8) -Rate the team's
project management techniques and methods and procedures for performing the
tasks.
3. Applicable Staff Qualifications (Weight 10) -A comparison of the team's
educational background and professional qualifications as they relate to the
Scope of Work for this project.
4. Applicable Related Project Experience (Weight 8) -Rates the team's overall
total number of years experience and roles performing engineering services as it
relates directly to the design and construction of this project. This also rates the
team's recent experience on applicable projects as it relates directly to the design
and construction support for this project.
5. Team Organization and Use of Subconsultants (Weight 5) -Addresses the
appropriateness of assignments to consultant staff and/or subconsultants to
consultant teams.
6. Proposed Schedule (Weight 5) -Rates the consultant's proposed schedule as
to whether it meets the District's needs and whether the consultant can meet the
EDMS: 003780761 J of4 9/3012004
schedule. This also rates whether the consultant provided an accelerated
schedule and could the consultant meet it.
The initial written proposal rankings were compiled on September 2, 2004. A meeting
was then held on September 7, 2004 to discuss the proposals, and the next day
(September 8, 2004 ), the team reconvened to finalize the team's rankings. During this
meeting the team decided to ask for additional technical information from both
proposers. The questions were sent via email to both firms and their responses were
received on the due date of September 9, 2004. The team had the opportunity to review
the answers provided by each firm and confirm the selection of the consultant for this ·
project. Table 1 presents the results of the team evaluation of the proposals submitted.
The ranking for each firm was:
1. Dudek & Associates, Inc.
2. Jacobson Helgoth Consultants
2012 Points
1857 Points
The following is a summary of how the evaluation team collectively viewed Dudek &
Associates, Inc. the top ranked consultant:
Dudek & Associates, Inc., was ranked number 1 by four of the six review team
members. The Dudek & Associates, Inc., proposal presented a concise approach, staff
experience was well balanced, the team had excellent related experience in collection
systems and in siphon facilities, excellent experience in trenchless technologies,
experience in odor control facilities and provided a solid discussion regarding the
calculation of sewage gas flows in siphon facilities. The proposed Project Manger's
qualifications were excellent. The proposed project support staff has the best similar
and most recent local project experience. The proposed project team, including sub-
consultants, is well organized based on specialties and division of the work. In addition
to these items, the following attributes formed the basis for Dudek & Associates, Inc.,
high ranking:
1. Excellent response to the additional technical questions
2. Excellent related project experience
3. Proposed an accelerated schedule
4. Good preliminary hydraulic system analysis
5. Excellent alternatives for foul air moving within a siphon
Fee Proposals
After the final ranking of the technical proposals, the sealed fee proposals submitted by
the two firms were opened on September 13, 2004. The Total Fee for Consultant
Services (PDR/Design/Construction Management Services) received from the
consultants arranged in the order from highest to lowest technical ranking were:
Total Fee (PDR/Design/CM Services)
Dudek & Associates, Inc.
Jacobson Helgoth Consulants
EDMS: 003780761
$ 987,156
$ 1,435,873
2of4 9130/2004
Based on the data provided above plus the highest technical ranking, Staff recommends
that Dudek & Associates, Inc., be awarded the Professional Services Agreement (PSA)
for the Rehabilitation of District Siphons, Contract No. 2-68, for a total design fee not to
exceed $ 987, 156.
EDMS: 003780761 3 of4 9/30/2004
TABLE 1
REHABILITATION OF DISTRICT SIPHONS
CONTRACT 2 -68
FIRM Dudek& Jacobs
Associates Helgoth
Reviewer 1 322 296
Reviewer2 391 277
Reviewer3 342 273
Reviewer4 257 260
Reviewers 309 380
Reviewers 391 371
TOTAL SCORE 2012 1857
AVERAGE SCORE 335 310
TECHNICAL RANKING 1 2
TABLE2
REHABILITATION OF DISTRICT SIPHONS
CONTRACT 2 -68
Firm Dudek& Jacobson
Associates Helgoth
Total Hours 6,006 7,417
Total Fee,$ 987,156 1,435,873
Total Cost oer hr, $/hr 164.36 193.59
EDMS: 003780761 4of4
~
9130/2004
MINUTES OF FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE MEETING
Orange County Sanitation District
Wednesday, October 13, 2004, 5:00 p.m.
A meeting of the Finance, Administration and Human Resources Committee of the Orange
County Sanitation District was held on October 13, 2004, at 5:00 p.m., in the District's
Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
FAHR COMMITTEE MEMBERS:
DIRECTORS PRESENT:
Roy Moore, Chair
Mike Duvall, Vice Chair
Bill Dalton
Shirley McCracken
Joy Neugebauer
James W. Silva
DIRECTORS ABSENT:
Patricia Bortle
Darryl Miller
Steve Anderson, Board Chair
Jim Ferryman, Vice Board Chair
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
The Chair had no report.
STAFF PRESENT:
Bob Ghirelli, Director of Technical Services and
Acting General Manager
Gary Streed, Director of Finance/Treasurer
Lisa Tomko, Director of Human Resources
Mike White, Controller
Jeff Reed, Human Resources Manager
Ann Sullivan, Human Resources Analyst
Jim Herberg, Engineering Manager
Jennifer Cabral, Public Information Specialist
Penny Kyle, Committee Secretary
OTHERS PRESENT:
Tom Woodruff, General Counsel
(5) REPORT OF THE GENERAL MANAGER
Bob Ghirelli, Acting General Manager, reported that General Manager Blake Anderson will
return to work on October 18.
The Directors were advised that the annual monitoring report on the SARI line determined there
were two areas of the pipeline that had less than two feet of coverage due to soil erosion that
must be addressed before the wet weather starts. The Sanitation District, as well as the Army
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page2
October 13, 2004
Corps of Engineers, has declared this an emergency. In accordance with the District's
delegation of authority for emergencies, Mr. Ghirelli advised that staff was proceeding to obtain
services to repair those areas and ratification by the Board of Directors should take place at the
October Board meeting.
Mr. Ghirelli briefly discussed the meeting held with the Huntington Beach Convention & Visitors
Bureau, and their displeasure over image impacts caused by the spill over the Labor Day
weekend. He advised they had requested the District participate in communications programs
focusing on beach water quality in response to the spill. The issue will be placed on the
Steering Committee agenda for October.
Jim Herberg, Engineering Manager, reported on the final two alternatives to be recommended
regarding the Ellis Avenue Pump Station. The public hearing would be held in December 2004,
and the project should be certified in March 2005.
(6) REPORT OF DIRECTOR OF FINANCE/TREASURER
Gary Streed, Director of Finance/Treasurer, referred the Directors to handouts that evening that
would be discussed in greater detail during consideration of Agenda Item Nos. 11(a) and (c).
(7) REPORT OF DIRECTOR OF HUMAN RESOURCES
Lisa Tomko, Director of Human Resources, introduced Ann Sullivan, Human Resources Analyst, to
the Committee.
(8) REPORT OF DIRECTOR OF COMMUNICATIONS & ADMINISTRATIVE SERVICES
Carol Beekman, Director of Communications & Administrative Services, updated the Directors on the
activities and accomplishment for the past quarter on the Communications and Administrative
Services Strategic Plan for FY 2004/05 (Agenda Item No. 12(a)). The next update would be
provided in February 2005.
(9) REPORT OF GENERAL COUNSEL
Thomas L. Woodruff, General Counsel, provided an update on the legal issues regarding the
construction of Bushard Trunk Replacement, Job No. 1-2-4. The project is facing probable shut
down due to pipe design and manufacturing problems. Correspondence has been received
from the attorney representing 87 property owners in the area.
Mr. Woodruff also provided a brief report on the SAWPA litigation issue which is currently on
hold while attempts to settle are ongoing with the new acting general manager of SAWPA.
(10) CONSENT CALENDAR ITEMS
a. Approve minutes of the September 8, 2004, Finance, Administration and Human
Resources Committee meeting, as corrected.
b. FAHR04-83 Recommend to the Board of Directors to receive and file Treasurer's
Report for the month of September 2004.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page3
October 13, 2004
c.
d.
e.
f.
g.
FAHR04-84 Receive and file Certificates of Participation (COP) Monthly Report.
FAHR04-85 Receive and file Employment Status Report as of September 20, 2004.
FAHR04-86 Receive and file OSHA Incidence Rates and Workers' Compensation
Claims and Costs Report.
FAHR04-87 Approve SAFETY-POL-402, Workers' Compensation Benefits and Leave
Program, as provided for in Resolution No. OCSD 02-5, regarding the
District's Injury and Illness Prevention Program Policy.
FAHR04-88 Approve SAFETY-POL-404, Early Return To Work Program, as provided
for in Resolution No. OCSD 02-5, regarding the District's Injury and
Illness Prevention Program Policy.
MOTION: It was moved, seconded and duly carried to approve the recommended
actions for items specified as 10(a) through (g) under Consent Calendar.
END OF CONSENT CALENDAR
(11) ACTION ITEMS
a. FAHR04-89 (1) Approve the Agreement to Terminate Collection of Sewer Connection
MOTION:
Charges with the City of Westminster for the collection of capital facilities
capacity charges, in a form approved by General Counsel; and,
(2) Approve the Agreement for Collection of Capital Facilities Capacity
Charges with the Midway City Sanitary District, in a form approved by
General Counsel.
Mike White, Controller, referred the Directors to a letter received from
Midway City Sanitary District in which they requested the agreement be
modified to include a 7% fee instead of the 5% fee that is currently in
effect with the other cities/agencies within the District's jurisdiction.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors for a 5% fee.
b. FAHR04-90 (1) Approve a Lease Agreement with Nautical Yacht Sales for the period
MOTION:
of 21 months, commencing September 1, 2004 through May 31, 2006, at
the rate of $5,000 per month; and,
(2) Approve an Office Lease Agreement with John R. Finnell on a
month-to-month basis, commencing September 1, 2004, at the rate of
$250 per month.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page4
October 13, 2004
c. FAHR04-91 Recommend to the Board of Directors to adopt revised rates to be
charged Permit Users for flow, biochemical oxygen demand (BOD) and
suspended solids (SS), based upon the Validated Capital Improvement
Program (CIP) that includes meeting secondary treatment standards but
excludes projects for additional capacity and based upon the actual
operations & maintenance expense ratios and provides for the
continuation of a total fee reduction for actual property taxes allocated to
the District for each Permit User.
MOTION:
Brian Keating and Gene Hill of Kimberly Clark spoke to the Committee
and requested the rate calculations be reconsidered.
Al Sheron of Jazz Semiconductor also spoke to the Directors regarding
his concern over the increased rate structure.
Gary Streed, Director of Finance, explained the change in rate
calculations for the permit users. Following discussion among the
Directors, Brian Keating and Al Sheron agreed to meet with Mr. Streed to
review the rate methodology. If there was a major discrepancy, Mr.
Streed would keep the FAHR committee members apprised.
Due to the substantive changes to the original ordinance proposed, Mr.
Woodruff advised the ordinance would need to have a first reading at the
October board meeting.
It was moved, seconded and duly carried to recommend approval to the
Board of Directors.
(12) INFORMATION PRESENTATIONS
a. FAHR04-92 Communications and Administrative Services Strategic Plan
FY 2004-05/Quarterly Update
This report was provided under the Director of Communications and
Administrative Services Report (Item 8).
(13) CLOSED SESSION
There was no closed session.
(14) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS. IF
ANY
There were none.
Minutes of the Finance, Administration and Human Resources Committee Meeting
-, Page 5
October 13, 2004
(15) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
Mr. Streed referred to Director Darryl Miller's e-mail requesting that next month's meeting include a
discussion on the 2004-05 and 2005-06 tax shift.
(16) CONSIDERATION OF UPCOMING MEETINGS
The next FAHR Committee meeting is scheduled for November 10, 2004 at 5 p.m.
(17) ADJOURNMENT
The Chair declared the meeting adjourned at 7:16 p.m.
Submitted by:
Penny M. Kyl
FAHR Committee Secreta
H:\dept\agenda\FAHR\FAHR2004\ 1004\ 101304 FAHR Minutes.doc
•
FAHR COMMITIEE
AGENDA REPORT
Orange County Sanitation District
FROM: Gary Streed, Director of Finance/Treasurer
Originator: Michael White , Controller
Meeting Date To Bd. o f Di r.
10/13/04 10/27/04
Item Number Item Number
FAHR04-83 14(b)
SUBJECT: TREASURER'S REPORT FOR THE MONTH OF SEPTEMBER 2004
GENERAL MANAGER'S RECOMMENDATION
Receive and file Treasurer's Report for the month of September 2004 .
SUMMARY
Pacific Investment Management Co. (PIMCO), serves as the District's professional
external money manager, and Mellon Trust serves as the District's third-party custodian
bank for the investment program . Some funds are also deposited in the State of
California Local Agency Investment Fund for liquidity.
The District's Investment Policy, adopted by the Board , includes reporting requirements
as listed down the left most column of the attached PIMCO Monthly Report for the
"Liquid Operating Monies" and for the "Long-Term Operating Monies" portfolios. The
District's external money manager is operating in compliance with the requirements of
the Investment Policy. The portfolio contains no reverse repurchase agreements.
As shown on page 2 of the attached PIMCO's Performance Monitoring and Reporting
Report for the Long -Term Operating Monies , there is a investment policy compliance
exception pertaining to the holding of one security within PIMCO 's Long-Term Operating
Monies Portfolio that had an acceptable rating at the time of purchase but has since
fallen below the minimum rating allowed by the investment policy. The District's
investment policy requires a minimum rating of A3 by Moody's or A-by S&P, with at
least a BBB rating in the event of a split rating, at the time of purchase. The rating
exception pertains to the holding of a United Airlines (UAL) Asset Backed Security with
a par value of $1 .6 million, re presenting 0.44 percent of the portfolio holdings, whose
rating from Moody's has fallen several times , from A3 to BA 1, then to BA3 , B3, B, and
finally to CA. Likewise, th e rating from Standard & Poor's has also fallen several times,
first from A-to BBB , then to BB, then to B+, B-, and finally to CCC+. Both rating
agencies have since withdrawn their ratings, Moody's in February 2004 and Standard &
Poor's in June 2004. Although these ratings are less than what is required at the time
of purchase , PIMCO believes , based on the financial strength of UAL and the
underlying collateral of the security, that the District would suffer an unwarranted loss if
the security was sold at this time.
H:\d eptlage nda\Board Agenda Report s\2004 Boa rd Age nda Reports\1004\ltem 14(b).Treasurcr Report .doc
Page 1
The Di strict's investment po licy does not require any action because of "credit watch"
notices or the decline in credit standing. However, PIMCO will continue to mon ito r the
credit for th is secu rity very closely.
Historical cost and current market va l ues are shown as estimated by both PIMCO and
Mellon T rust. The District's portfolios are priced to market ("mark-to-market") as of the
last day of each reporting period . T h e slight differences in value are related to minor
variatio ns in pricing assumptio ns by the valuation sources at the estimate date.
BUDGET IMPACT
D This item has been budgeted . (Line item :
1:8] Not appli cab le (i nformation item)
ADD IT IONAL INFORMATION
Schedules are attached summarizi ng the detail for both the short-term and long -term
investm e nt portfolios for the report in g period. In add ition , a consolidated report of
posted investment portfolio transactions for the month is attached . The attached y ield
analysis report is presented as a monitoring and report i ng enhancement. In this report,
yield ca lcu latio n s based on book va lu es and market values are shown for i ndividual
ho ldings, as well as for each portfol io . Mellon T r ust, the District's custodian bank , is the
source for these reports. Transactio ns that were pending settlement at month end may
not be reflected . Also provided is a summary of monthly i nvestment ba lances and
transactions within the State of California Local Agency Investment Fund (LAIF).
These reports accurately reflect all District investme nts and are in compliance with
California Government Code Section 53646 and the D istrict's Investment Policy.
Sufficient liquid ity and anticipated revenues are availab le to meet budgeted
expenditures for the next six m onths .
T he tab le on the followi ng page details the book balances of the District's investme nt
accounts at month -end . A graphical representation of month -end balances is shown on
the attached bar c hart.
Boo k Balances E stim ated
Investment Accounts Septembe r 30 , 2004 Y ield(%)
Sta te of Calif. LAIF $ 26 ,710,595 1.77
Union Bank Che cking A ccount 1,739,035 1.33(1)
P IMCO -Short-term Portfolio 72 ,521,951 1.80
PIMCO -Lon g-term Portfolio 36 0,837,599 2 .97
Petty Cas h 4 000 N/A
TOTAL $461813180 2.71
Debt Se rvice Reserves w/Trustees $62 4Z6 5:15 3.0 5
(1) This is the an nualized y ield for th e month of Augus t. The S eptember ann ualized ra te was
not availa ble as of the date of this report .
C:\Documents and Settlngslcranellocal SetUngs\Temporary Internet FileslOLK341TREASRPT101304.doc
Page 2
..
ATTACHMENTS
1. Graph of Monthly Investment Balances by Type -Last Six Months
2. Investment Transactions and Balances in the State Local Agency Investment Fund
3. PIMCO Monthly Investment Recap & Yield Analysis Report
4. PIMCO Performance Monitoring Report -Liquid Operating Monies
5. PIMCO Performance Monitoring Report-Long-Term Operating Monies
6. Mellon Trust Asset Summary by Asset Type with Sectors -Liquid Operating Monies
7. Mellon Trust Asset Summary by Asset Type with Sectors -L-T Operating Monies
8. Mellon Trust Yield Analysis Report
9. Mellon Trust Asset Detail -Consolidated
10. Mellon Trust Transaction Detail -Consolidated
MW:bg
C:\Documenls and Setlings\crane\Local Seltings\Temporary Internet Files\OLK34\TREASRPT101304.doc
Page3
Prepared by Finan ce , 10/13/2004, 11: 1 O AM
Monthly Investment Balances by Type-
Last Six Months
$700 ,000,000 -·.-------------------------------~
$600' 000 ' 000 -1---
$500,000,000 -1---
$300,000,000
$0
April
2004
May
2004
June
2004
July
2004
~ PIMCO -Long-term 0 PIMCO -Short-term ~COP Debt Reserves
llD LAIF 0 Bank Accts BPetty Cash
H :\dept\fin\EXCEL.dta\220\geggie\mo treas rpt\M o nthly Investment Balances Graph1 .xis
August
2004
September
2004
Orange County Sanitation District
Investment Transactions and Balances in the
State of California Local Agency Investment Fund
September 30, 2004
Par Value Book Value Market Value
Balance
September 1, 2004 $20,710,595 $20,710,595 $20, 710,595
Deposits:
9/15/2004 25,500,000 25,500,000 25,500,000
9/21/2004 2,100,000 2,100,000 2,100,000
Total Deposits 27,600,000 27,600,000 27,600,000
Withdrawals:
9/1/2004 (5,000,000) (5,000,000) (5,000,000)
9/9/2004 {4,200,000) (4,200,000) (4,200,000)
9/23/2004 (1,000,000) (1,000,000) (1,000,000)
9/24/2004 (8,500,000) (8,500,000) (8,500,000)
9/29/2004 {2,900,000} ~2,900,000} {2,900,000}
Total Withdrawels (21,600,000} (21,600,000} (21,600,000)
Balance
September 30, 2004 $26,710,595 $26,710,595 $26,710,595
Rate Yield
1.771 1.771
1.771 1.771
1.771 1.771
1.771 1.771
1.771 1.771
1.771 1.771
1.771 1.771
1.771 1.771
1.771 1.771
1.771 1.771
1.771 1.771
PIM C 0
October 12, 2004
Mr. Mike White, CPA
Controller
Orange County Sanitation District
I 0844 Ellis A venue
Fountain Valley, CA 92708-7018
Dear Mike:
The following is a description of events in the bond markets during the month of September in
addition to an analysis of the strategies undertaken in the Orange County Sanitation District's
Long-Term and Liquid portfolios over the period. Also included is a section on our outlook and
preferred strategies to be pursued in your portfolios during the coming months.
Bond Market Recao:
U.S. bond sectors trended lower over most of the month due to softer inflation numbers and a less
optimistic tone from Fed Chairman Greenspan on the economic outlook. The yield on the
benchmark 10-year Treasury note dipped below the 4% watermark before finishing the month at
4.12%. The month-end sell off was driven by second quarter economic growth numbers, which
exceeded forecasts. U.S. Treasuries returned 0.26% for the month, while the Lehman Brothers
Global Real U.S. TIPS index returned 0.20% for the month. On a duration-adjusted basis, short
and intermediate maturity TIPS underperformed their nominal counterparts while longer maturity
TIPS outperformed. Mortgage-backed securities returned 0.15%, exceeding Treasuries by 2 basis
points after adjusting for duration. The credit sector, represented by the Lehman Credit Index,
returned 0.56%, outperforming Treasuries for the month by 30 basis points. Within the sector,
lower quality investment grade corporates outperformed higher quality issues.
The Fed hiked interest rates in September for the third time this year, raising the Fed funds rate by
25 basis points to 1. 75%. The Fed also reiterated its plan to tighten at a "measured" pace.
September began with a weaker than expected Employment Situation Report (issued by the
Bureau of Labor Statistics), indicating that the economy created only 144,000 new jobs in
August, below consensus estimates of 150,000. The unemployment rate declined to 5.4% as the
number of unemployed and the labor force contracted. The Consumer Price Index (CPI) as
reported by the Bureau of Labor Statistics inched 0.1 % higher in August, with energy prices
falling 0.3% and food prices increasing the smallest amount since January. Core consumer prices
Mr. Mike White, CPA
Orange County Sanitation District
October 12, 2004
Page2
(which exclude volatile food and energy prices) also rose only 0.1 %, pulling the core annual rate
of inflation down to 1. 7%. Lastly, the Bureau of Economic Analysis revised second quarter GDP
growth up from 2.8% to 3.3%, indicating that the economy has not slowed as dramatically as
previously thought. Although consumer spending growth looked quite weak, other categories of
aggregate spending appear to have mitigated some of the weakness in the consumer sector.
Despite the upward revision, this quarter had still the weakest GDP growth since early 2003.
Treasury yield changes during the month of September are summarized as follows:
• 3-month bills: + 13 basis points to 1. 70%
• 6-month bills: +20 basis points to 1.99%
• 2-year notes: + 21 basis points to 2.61 %
• 5-year notes: +6 basis points to 3.37%
• I 0-year notes: unchanged at 4.12%
• 30-year notes: -4 basis points to 4.89%
Performance Attribution:
Long-Term Portfolio
The Long-Term portfolio that PIMCO manages on behalf of Orange County Sanitation District
lost -0.02% on a total return basis for the month of September, underperforming the Merrill
Lynch 1-5 year Government Corporate Index by 2 basis points. The following points summarize
returns for the month ended September 30:
• The Long-Term portfolio underperformed the benchmark by 2 basis points for the month.
• For the twelve-month period, the Long-Term portfolio returned 2.22%, outperforming
the benchmark by 4 7 basis points.
• Portfolio duration, below the index, was positive for monthly performance as rates rose
for short and intermediate maturities.
• Yield curve positioning similar to that of the index was neutral for performance.
• An underweight exposure to corporates was negative for performance, as corporates
outperformed Treasuries on a duration-adjusted basis.
• Exposure to mortgage-backed securities was modestly positive for relative performance
as the sector slightly outperformed Treasuries on a duration-adjusted basis.
• Substituting Treasury Inflation Protected Securities for nominal Treasuries was negative
for performance as short and intermediate TIPS lagged their nominal counterparts during
the month.
Mr. Mike White, CPA
Orange County Sanitation District
Liquid Portfolio
October 12, 2004
Page3
The Liquid portfolio that PIMCO manages on behalf of Orange County Sanitation District
generated a total return of 0.11 % during the month of September, performing in line with the 3-
month Treasury Bill Index. The following points summarize returns for the period ending
September 30:
• The Liquid portfolio performed in line with the benchmark for the month.
• For the twelve-month period, the Liquid portfolio returned 1.13%, outperforming the
benchmark by 9 basis points.
• Use of higher yielding securities such as commercial paper and short-term notes
contributed to performance.
Outlook and Strategv:
The global economy, propped up for the last several years by low interest rates and considerable
government and consumer borrowing in the U.S., is perched on a tightrope. Deflation (ice) and
inflation (fire) are on either side of the wire. In this leveraged world, conditions for instability that
could tip the walker in one direction will accelerate over the next three to five years. Momentum
swings will supplant the more durable economic trends witnessed during recent periods of
disinflation (1980-2000) or inflation (1965-1979). U.S. real growth will stabilize near 2% over
the current secular period, with Europe and Japan near that level. The benchmark 10-year
Treasury yield looks fairly valued for now and is unlikely to climb much above 5% in the near
term. The following are risks that could tilt the wirewalker in one direction or another:
• More Government More Inflation -Emphasis on the private sector in 1980-2000 promoted disinflation, but
history suggests that as government spending climbs as a share of GDP, inflation and interest rates tend to rise.
Early indicators of a coming "bull market in government" are: large fiscal deficits, litigation across the
securities industry, implementation of Sarbanes-Oxley over the entire corporate sector; imposition of steel and
lumber tariffs, higher military spending to combat terrorism and Homeland Security measures.
• Policy Mistakes -A leveraged U.S. economy is wlnerable to policy mistakes by a Federal Reserve that is no
longer proactive in battling inflation but instead reactive to economic data. Leaving rates too low for too long
may have fueled inflation and created bubbles in housing, stocks and bonds, but raising them too quickly would
eventually force a painful retrenchment by the overextended U.S. consumer.
• Imbalances In Trade and Finance -Asian central banks provide much of the financing for the U.S. fiscal and
trade deficits. To date, playing banker to the U.S. has suited China and Japan's political agenda, which is to
keep their currencies cheap to support internal growth. A change in China's agenda sparked, for example, by a
geopolitical shock over North Korea or Taiwan would mean a pullback in their purchases of Treasuries, higher
interest rates and a plunge in the dollar.
• Geopolitical Risks -America is stretched geopolitically as well as financially. A seemingly endless struggle
against terrorism worldwide, accompanied by constraints on travel and trade, will be a persistent threat to
consumer confidence and spending.
We will position the portfolios for a mildly bearish environment for U.S. bonds and continued
overvaluation of core bond sectors. We plan to retain our exposure to the mortgage sector to
Mr. Mike White, CPA
Orange County Sanitation District
October 12, 2004
Page4
benefit from structural yield advantage and high credit quality, while limiting exposure to
corporate bonds where rich valuations offer small compensation for credit risk. We intend to
continue holding TIPS which hedge against secular inflation risk and are less volatile than
nominal bonds in a rising rate environment. We plan to target duration modestly below index in
case rates continue to trend higher, with an emphasis on short/intermediate maturities.
We look forward to discussing these and other topics with you in the near future.
Best regards,
Christine Telish, CF A
Vice President
John M. Miller, CFA
Senior Vice President
Orange County Sanitation District
for the month ending September 30, 2004
Total Return Account -203
Market Value
Book Value
Yield to Maturity
Short Term Account -603
Market Value
Book Value
Yield to Maturity
With Accrued Interest
363,135,384
359,394,506
2.97
Wrth Accrued Interest
72,767,435
72,777,236
1.80
Without Accrued Interest
360,875,901
357,135,023
2.99
Without Accrued Interest
72,560,843
72,570,643
1.81
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 30 September 2004)
Liquid Operating Monies (603)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
• PIM CO • Mellon
Historical Cost:
• PIM CO
• Mellon
15.1.2 MODIFIED DURATION Of Portfolio:
Of Index:
15.1.3 1 % INTEREST RATE CHANGE Dollar lnmact (gain/loss) of 1% Change:
15.1.4 REVERSE REPOS % of Portfolio in Reverse Repos:
(see attached schedule)
15.1.5 PORTFOLIO MATURITY % of Portfolio Maturing within 90 davs:
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality:
15.1.7 SECURITIES BELOW "A" RATING % of Portfolio Below "A":
lS.1.8 INVESTMENT POLICY COMPLIANCE "In Conmliance"
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%) by
Period:
1 Month:
3 Months:
12 Months:
Fiscal Year-to-Date:
Commentary
• The Liquid portfolio performed in line with the benchmark for the month, but Jagged the benchmark by 3 basis points fiscal year-to-date.
• PIMCO's emphasis on higher yielding securities such as commercial paper and short-term notes contributed to performance.
H:\dept\On\120\geule\FAHR\LIQOSOD-04-09.RPT.doc
Page 1of1
$72,767,435
$72, 739,393
$72, 777 ,236
$72,781,762
0.15
0.20
$109,151
0%
96%
"AAA"
0%
Yes
Portfolio Index
0.11 0.12
0.35 0.32
1.13 1.04
0.35 0.32
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 30 September 2004)
Long-Term Operating Monies (203)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
• PIM:CO • Mellon
Historical Cost:
• PIM:CO
• Mellon
15.1.2 MODIFIED DURATION Of Portfolio:
Of Index:
15.1.3 1 % INTEREST RATE CHANGE Dollar Inmact (gain/loss) of 1 % Change:
15.1.4 REVERSE REPOS % of Portfolio in Reverse Repos:
(see attached schedule)
15.1.5 PORTFOLIO MATURITY % of Portfolio Maturing within 90 days:
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Qualitv:
15.1.7 SECURITIES BELOW "A" RATING % of Portfolio Below "A":
15.1.8 INVESTMENT POLICY COMPLIANCE "In Comnliance"
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%) by
Period:
1 Month:
3 Months:
12 Months:
Fiscal Year-to-Date:
• The Long-Tenn portfolio lagged the benchmark by 2 basis points for the month, and by 13 basis points fiscal year-to-date.
• Portfolio duration, below the index, was positive for monthly performance as rates rose for short and intermediate maturities.
• Yield curve positioning similar to that of the index was neutral for performance.
• An underweight exposure to corporates was negative for performance, as corporates outperformed Treasuries on a duration-adjusted basis.
• Exposure to mortgage-backed securities was modestly positive for relative performance as the sector slightly outperfonned Treasuries on a duration-adjusted basis.
Page 1 of2
$363,135,384
$363,160,587
$359,394,506
$361,362,533
2.00
2.45
$7,262,708
0%
9%
AAA
0%
No*
Portfolio Index
-0.02 0.00
1.56 1.69
2.22 1.75
1.56 1.69
• Substituting Treasury Inflation Protected Securities for nominal Treasuries was negative for performance as short and intennediate TIPS lagged their nominal counterparts during the month.
*Compliance Issues:
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 30 September 2004)
Page2of2
$1.600.000 par of United Airlines (UAL) Pass-Through 2001-1-C <Enhanced Equipment Trust Certificate CEETC) -909317BC2), 6.831 % coupon, 3/01/201 O maturity,
representing 0.44% of the portfolio holdings on a par basis was purchased on 8/10/2001; and subsequently downgraded by Moody's from A3 to BAI (on 9/18/2001) and
S&P from A-to BBB (on 9/20/2001 ). The security was further downgraded by Moody's from BA 1 to BA3 (on 12/21/2001) and by S&P from BBB to BB (on 6/28/02).
Following news of the possible bankruptcy filing, the security was further downgraded in August (B3 Moody's, B+ by S&P). On November 29, 2002, S&P further
downgraded this issue to B, and shortly thereafter on December 9, 2002, downgraded the issue one notch further to B-. On August 7, 2003, S&P downgraded the issue to
CCC+, while Moody's followed suit on August 28, 2003 with a downgrade to CA. Both rating agencies have since withdrawn their ratings (Moody's withdrew in
February 2004 and S & P withdrew in June 2004). The District's investment policy requires a minimum rating of A3 by Moody's or A-by S&P, with at least a BBB rating
in the event of a split.
On October 7, UAL announced it would cut 12% of available seats on US flights and increase capacity on more lucrative international routes by 14% as part ofits aggressive cost-
cutting campaign to emerge from bankruptcy. The company also said it plans to reduce its mainline fleet to 455 aircraft by next March, 68 fewer than it flew in August 2004 and a
reduction of 112 planes, or nearly 20% since 2002. The capacity shift will leave international service accounting for 40% of mainline capacity and half of mainline revenue by the
end of next year, UAL said. International routes currently account for 35% of available seats and 45% of revenue.
PIMCO continues to negotiate with United on our holdings and currently leads an ad hoc committee. This has been an extremely complicated effort due to the complex nature of
United's bankruptcy. These negotiations have required PIMCO's analysts access to non-public infonnation and therefore sharing them results in parties becoming restricted. In
light of this extremely complicated bankruptcy, PIMCO continues to strive to act in the most prudent manner to obtain maximum recovery.
Split Rated Securities Still In Compliance:
The District's investment policy requires a minimum rating of A3 by Moody's or A-by S&P, with at least a BBB in the event ofa split rating.
• $1,000,000 par of Ford Motor Credit securities (cusip 345397GV9 maturing 5/15/05), representing 0.28% of the portfolio holdings on a par basis (exposure was reduced in July
2004 as $2.5 million par matured). The securities were downgraded on 10/16/2001 by S&P from A to BBB+, then to BBB on 10/25/02, and then to BBB-on 11/13/03. Moody's
downgraded the securities on 1/16/02 fromA2 to A3.
• $3,000,000 par of General Motors Acceptance Corp securities (cusip 370425SD3) maturing on August 28, 2007, representing 0.83% of the portfolio holdings on a par basis. The
securities were downgraded on 10/16/2001 by S&P from A to BBB+, and a further downgrade to BBB occurring on 10/16/2002. The securities now carry a Moody's rating of A3
after a further downgrade from A2 on 6/14/03.
• $1,750,000 par of Virginia Electric Power NT securities (cusip 927804ENO), maturing in 2006, represents 0.48% of the portfolio holdings on a par basis. The security was
downgraded on 10/21/2002 by S&P from A-to BBB+, but continues to carry a Moody's rating of A3.
H:ldeptljinl2201geggielF AHRIL-TOBOfJ...04-09.RPT.doc
.,
q/b Mellon
LIQUID OPER-P.lMCO -OCSF07511102
CASH & CASH EQUIVALENTS
U.S. DOLLAR
INTEREST
CERTIFICATES OF DEPOSIT -DOMESTIC
FED HM LOAN BNK -LESS THAN 1 YR
FEDERAL HOME LOAN MORTGAGE -LESS THAN 1 YR
FNMA ISSUES -LESS THAN 1 YR
MUTUAL FUNDS
TREASURY BILLS -LESS THAN 1 YR
FIXED INCOME SECURITIES
U.S. DOLLAR
BANKING & FINANCE
INDUSTRIAL
U.S. DOLLAR
CASH & CASH EQUIVALENTS
U.S. DOLLAR
FIXED INCOME SECURITIES
TOTAL ASSETS ·BASE:
10/11/2004 10:28:51AM PDT
Asset Summary
by Asset Type with Sectors
9/30/2004
217,442.04
5,500,000.000 5,500,000.00
13,400,000.000 13,353,723.00
14,400,000.000 14,338,956.39
14,600,000.000 14,538,655.50
94,358.050 94,358.05
17 ,600,000.000 17,534,153.29
65,594,358.050 65,577,288.27
65,594,358.050 65,577 ,288.27
5,500,000.000 5,614,810.00
1,575,000.000 1,589,663.25
7 ,075,000.000 7 ,204,473.25
7 ,075,000.000 7 ,204,473.25
72,669,358.050 72,781,761.52
1
Report m: GL8251
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
217,442.04 0.30% 0.00
5,500,000.00 7.56% 0.00
13,353,723.00 18.36% 0.00
14,338,956.39 19.71% 0.00
14,538,655.50 19.99% 0.00
94,358.05 0.13% 0.00
17,534,153.29 24.11% 0.00
65,577 ,288.27 90.15% o.oo
65,577 ,288.27 90.15% 0.00
5,584,900.00 7.68% -29,910.00
1,577 ,205.00 2.17% -12,458.25
7,162,105.00 9.85% -42,368.25
7,162,105.00 9.85% -42,368.25
72, 739,393.27 100.00% -42,368.25
Workbench
fb Mellon
LONG TERM OPER-PIMCO -OCSF07522202
CASH & CASH EQUIVALENTS
U.S. DOLLAR
PENDING TRADES
INTEREST
COMMERCIAL PAPER -DISCOUNT
FED HM LOAN BNK -LESS THAN 1 YR
FEDERAL HOME LOAN MORTGAGE -LESS THAN 1 YR
FNMAISSUES-LESSTHANlYR
MUTUAL FUNDS
TREASURY BILLS -LESS THAN 1 YR
U.S. DOLLAR
CASH & CASH EQUIVALENTS
FIXED INCOME SECURITIES
U.S. DOLLAR
ABS -AIRPLANE RECEIVABLES
ABS -HOME EQUl'IY
BANKING & FINANCE
COLLATERALIZED MORTGAGE OBLIGATION COMM/<
FHLMC MULTICLASS
FHLMC POOLS
FNMA POOLS
FNMAREMIC
GNMA MULTI FAMILY POOLS
GNMA SINGLE FAMILY POOLS
INDUSTRIAL
INFLATION INDEXED SECURITIES
INSURANCE
PVT PLACEMENTS -MORE THN 1 YR
U.S. AGENCIES
U.S. GOVERNMENTS
UTILI'IY -ELECTRIC
10/11/2004 10:31:37AM PDT
U.S. DOLLAR
Asset Summary
by Asset Type with Sectors
9/30/2004
-42,254,518.95
2,322,987.65
700,000.000 696,370.47
4,300,000.000 4,281,279.28
400,000.000 397,784.56
16,200,000.000 16,134,122.02
1,138,604.420 1J138,604.42
16,000,000.000 15,843,937.78
38, 738,604.420 -1,439,432.77
38, 738,604.420 -1,439,432. 77
1 ,600,000.000 1,600,000.00
779,923.690 779,923.69
11,000,000.000 11,008, 798.00
1,920,261.520 1,920,261.52
873,311.340 874,241.70
63,273.510 61,731.20
53,460,150.680 54,387,072.00
719,440.970 733,829.79
4,163,708.170 4,140,720.58
598, 735.870 627,749.36
3,000,000.000 2,999,910.00
35,318,880.000 35,335,799. 79
1,600,000.000 1,594,032.00
752,000.000 826,199.84
33,930,387.380 34,898,038.45
203 ,685, 923. 500 206,319,287.64
4, 750,000.000 4,694,370.00
358,215,996.630 362,801,965.56
1
Report ID: GL8251
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
-42,254,518.95 -11.64% 0.00
2,322,987.65 0.64% 0.00
696,370.47 0.19% 0.00
4,281,279.28 1.18% 0.00
397,784.56 0.11% 0.00
16,134,122.02 4.44% 0.00
1,138,604.42 0.31% 0.00
15,843,937.78 4.36% 0.00
-1,439,432.77 -0.40% 0.00
-1,439,432.77 -0.40% 0.00
139,392.00 0.04% -1,460 ,608.00
778,705.45 0.21% -1,218.24
11,244,680.00 3.10% 235,882.00
2,081,947.54 0.57% 161,686.02
875,896.34 0.24% 1,654.64
64,871.04 0.02% 3,139.84
54 ,376,328. 71 14.97% -10,743.29
721,674.11 0.20% -12,155.68
4, 194,366.03 1.15% 53,645.45
634,804.51 0.17% 7,055.15
2,999,520.00 0.83% -390.00
38, 706,006.82 10.66% 3,370,207.03
1,649,248.00 0.45% 55,216.00
826,199.84 0.23% 0.00
35,050, 733.53 9.65% 152,695.08
205,427,602.92 56.57% -891,684.72
4,828,042.50 1.33% 133,672.50
364,600,019.34 100.40% 1,798,053.78
Workbench
Mellon
LONG TERM OPER-PIMCO • OCSl'07522202
FIXED INCOME SECURITIES
TOTAL ASSETS -BASE:
10/11/2004 10:31:37AM PDT
Asset Summary
by Asset Type with Sectors
9/30/2004
358,215,996.630 362,801,965.56
396,954,601.050 361,362,532. 79
2
Report m: GL8251
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
364,600,019.34 100.40% 1,798,053.78
363, 160,586.57 100.00% 1, 798,053. 78
Workbench
ti
YLDANAL YIELD ANALYSIS PAGE 1
OCSF07511102 2004/09/30 RUN DATE 10/04/04
DISTRICT: LIQUID OPERATING RUN TIME : 09.21.54 ==========================---------=========================================o==========
PAR VALUE YTM AT CURRENT MOODY MARRBT TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARRBT VALUE % TOTAL
-------------------------------------------------------------------------------------------------
CASH & CASH EQUIVALENTS
2,200,000.00 BANK OF AMERICA NA INSTL C/D .ooo 1.620 100.000 2,200,000.00 3.36
06050GEM8 1.620% 11/02/2004 DD 08/06/04 2,200,000.00 3.03
8,400,000.00 FEDERAL HOME LN BKS CONS DISC .ooo .ooo P-1 99. 716 8,376,181.33 12.81
313384028 MAT 11/19/2004 A-1+ 8,376,181.33 u.55
5,000,000.00 FEDERAL HOME LN BK CONS DISC N .ooo .ooo P-1 99.551 4,977,541.67 7.61
313384S59 MAT 12/08/2004 A-1+ 4, 977, 541. 67 6.86
7,300,000.00 FEDERAL ROME LN MTG CORP DISC .ooo .ooo P-1 99.601 7,270,844.61 11.12
313396N82 MAT 11/09/2004 A-1+ 7,270,844.61 10.03
1,000,000.00 FEDERAL HOME LN MTG CORP DISC .ooo .ooo P-1 '9.586 995,860.00 1.52
313396P72 MAT 11/16/2004 A-1+ 995,860.00 1.37
6,100,000.00 FEDERAL ROME LN MTG CORP DISC .ooo .ooo P-1 99.545 6, 072, 251. 78 9.29
ll3396T37 MAT 12/14/2004 A-1+ 6,072,251.78 8.37
1,800,000.00 FEDERAL NATL MTG ASSN DISC NT .ooo .ooo P-1 99.597 1,792,755.00 2.74
313588N27 MAT 11/3/2004 A-1+ 1,792,755.00 2.47
2,900,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.592 2,788,569.39 4.26
313588P82 MAT 11/17/2004 A-1+ 2,788,569.39 3.85
4,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.578 3,983,114.44 6.09
313588073 MAT 11/24/2004 A-1+ 3,983,114.44 5.49
6,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.570 S,974,216.67 9.14
313588R64 MAT 12/01/2004 A-1+ 5,974,216.67 8.24
5,600 1 000.00 U S TREASURY BILL .ooo .ooo P-1 99.630 5,579,262.11 8.53
91279SRI<9 DUE 11/04/2004 DD 05/06/2004 A-1+ 5,579,262.11 7.69
2,000,000.00 U S TREASURY BILL .ooo .ooo P-1 99.600 1,'91,997.50 3.04
912795RL7 DUE 11/12/2004 DD 05/13/2004 A-1+ 1,991,997.50 2.75
s,000,000.00 U S TREASURY BILL .ooo .ooo P-1 99.644 4,982,207.29 7.62
912795RM5 DUB 11/18/2004 DD 05/20/2004 A-1+ 4,982,207.29 6.87
s,000,000.00 U S TREASURY BILL .ooo .ooo P-1 99.614 4,980,686.39 7.62
912795RN3 DUE 11/26/2004 DD 05/27/2004 A-1+ 4,980,686.39 6.87
YLDANAL
OCSF07511102
DISTRICTS LIQUID OPERATING
YIELD ANALYSIS
2004/09/30
PAGE
RUH DATE
RUN TIME
2
: 10/04/04
09.21.54
===============================================================~=================--=====--===========================c========
PAR VALUE YTM AT CURRBNT MOODY HARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
1,100,000.00 WELLS FARGO BANK NA INSTL C/D .ooo 1.650 100.000 1,100,000.00 1.68
9497P1BU2 1.650% 10/07/2004 DD 09/09/04 1,100,000.00 1.52
2,200,000.00 WELLS FARGO BANK NA INSTL C/D .ooo 1.600 100.000 2,200,000.00 3.36
9497PlCL1 1.600% 10/04/2004 DD 09/30/04 2,200,000.00 3.03
94 1 358.0S DREYFUS TREASURY CASH MGMT .ooo 1.459 AAA 100.000 94,359.0S .14
996085247 AAA 94,358.05 .13
-----------------------------------------TOTAL CASH & CASH EQUIVALENTS .ooo .110 65,359,846.23 100.00
65,359,846.23 90.12
FIXED INCOME SECURITIES
3,000,000.00 ASSOCIATES CORP NORTH AMER SR .ooo 6.447 AAl 102.765 3,112,350.00 43.04
046003FF1 6.625% 06/15/2005 DD 06/09/95 AA-3,082,950.00 4.25
1,575,000.00 DU PONT EI DE NEMOURS & CO NT .ooo 6.741 AA3 100.140 1,589,663.25 22.02
263534BB1 6.750% 10/15/2004 DD 10/20/99 AA-1,s11,2os.oo 2.17
2,soo,000.00 GENERAL ELEC CAP MTN tTR 00526 .ooo 2.003 AAA 100.078 2,502,460.00 34.93
36962GXX7 VAR RT 03/15/2005 DD 03/20/02 AAA 2,501,950.00 3.45
-----------------------------------------TOTAL FIXED INCOME SECURITIES .ooo s. 763 7,204,473.25 100.00
7,162,105.00 9.87
-----------------------------------------TOTAL .ooo .233 72,564,319.48 100.00
72,521,951.23 100.00 == ==== ========
YLDANAL YIELD ANALYSIS PAGE 3
OCSF07522202 2004/09/30 RUN DATE : 10/04/04
DISTRICTS LONG-TERM OPERATING RUN TIME I 09. 21. 54
===========================================================================================--================--============:i::~==
PAR VALUE YTM AT CURRENT MOODY HARDT TOTAL COST/ \ TYPE
SECURITY IO SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
CASH & CASH EQUIVALENTS
100,000.00 FEDERAL HOME LN BK CONS DISC .ooo .ooo P-1 99.601 697,204.28 1.81
313384P37 A-1+ 697,204.28 .17
3,600,000.00 FEDERAL HOME LN BK CONS DISC N .ooo .ooo P-1 99.558 3,584,075.00 9.31
313384559 MAT 12/08/2004 A-1+ 3,584,075.00 .89
400,000.00 FEDERAL HOME LN MTG CORP DISC .ooo .ooo P-1 99.446 397,784.56 1.03
313396071 MAT 11/24/2004 A-1+ 397,784.56 .10
100,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.766 698,364.14 1.81
313588P66 MAT 11/15/2004 A-1+ 698,364.14 .17
5,400,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.604 5,378,617.50 13.97
313588P82 MAT 11/17/2004 A-1+ 5,378,617.50 1.33
900,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.580 796,643.11 2.06
313588073 MAT 11/24/2004 A-1+ 796,643.11 .20
1,100,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.665 1,096,315.00 2.84
313588R49 MAT 11/29/2004 A-1+ 1,096,315.00 .27
4,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.591 3,983,636.61 10.34
313588R64 MAT 12/01/2004 A-1+ 3,983,636.61 .99
200,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99 .SSS 199,110.22 .51
313588S55 MAT 12/08/2004 A-1+ 199,110.22 .05
400,000.00 FEDERAL NATL MTG ASSN DISC HTS .ooo .ooo P-1 99.568 398,270.44 1.03
313588T47 MAT 12/15/2004 A-1+ 398,270.44 .10
3,600,000.00 FEDERAL NATL MTG ASSN DISCOUNT .ooo .ooo P-1 99.532 3, 583, 165.00 9.30
313588U37 MAT 12/22/2004 A-1+ 3,583,165.00 .89
soo,000.00 GENERAL ELEC CAP DISC .ooo .ooo P-1 99.450 497,249.58 1.29
36959BLGO 11/16/2004 497,2,0.58 .12
200,000.00 GENERAL ELEC CAP DISC .ooo .ooo P-1 99.560 199, 120. 89 .51
36959BM20 12/02/2004 199, 120.89 .os
16,000,000.00 U S TREASURY BILL .ooo .ooo P-1 99.025 15,843,937.78 41.16
912795SG7 DUE 03/31/2005 DD 09/30/2004 A-1+ 15,843,937.78 3.93
YLDANAL YIELD ANALYSIS PAGE 4
OCSF07522202 2004/09/30 RUH DATE 10/04/04
DISTRICT: LONG-TERM OPERATING RUH TIME : 09.21.54
=====~====~==================================================================================================================
PAR VALUE YTM AT CURRENT MOODY MARRET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
1,138,604.42 DREYFUS TREASURY CASH MGMT .ooo 1.459 AAA 100.000 1,138,604.42 2.95
996085247 AAA 1,138,604.42 .28
-----------------------------------------TOTAL CASH & CASH EQUIVALENTS .ooo .001 38,492,098.53 100.00
38,492,098.53 9.54
FIXED INCOME SECURITIES
752,000.00 AIG SUNAMERICA GLOBAL REG S .ooo 5.325 109.867 826,199.84 .22
U00907AAO 5.850% 08/01/2008 DD 08/08/01 826,199.84 .20
22,000,000.00 COMMIT TO PUR FNMA SF MTG .ooo 4.923 AAA 101.563 22,381,562.50 6.12
OlF0504Al 5.000% 10/01/2019 DD 10/01/04 AAA 22,343,750.00 S.54
4,000,000.00 COMMIT TO PUR FNMA SF MTG .ooo 5.430 AAA 101.297 4,055,859.37 1.11
OlFOS26A5 5.500% 10/01/2034 DD 10/01/04 AAA 4,051,875.20 1.01
3,500,000.00 FEDERAL HOME LN BK CONS BDS .ooo 6.992 AAA 101.895 3,732,225.00 .97
3133MAUN7 7.125% 02/15/2005 DD 02/08/00 AAA 3,566,338.65 .88
63,273.51 FBLMC GROUP 178-6064 .ooo 3.304 AAA 102.525 61,731.20 .01
31348SWZ3 6.384% 01/01/2028 DD 12/01/97 AAA 64,871.04 .02
11,350,000.00 FEDERAL NATL MTG ASSN DEBS .ooo 5.037 AAA 104 .219 11, 521, 271. 50 3.24
31359MJX2 5.250% 06/15/2006 DD 06/22/01 AAA 11,828,822.45 2 .93
694,374.27 FNMA POOL f0254510 .ooo 4.905 AAA 101.941 715,205.49 .19
31371KVB4 5.000% 11/01/2017 DD 10/01/02 AAA 707,854.92 .18
149, 427. 46 FNMA POOL 10254631 .ooo 4.905 AAA 101.941 153,910.29 .04
31371KY47 5.000% 02/01/2018 DD 01/01/03 AAA 152,328.46 .04
132,882.67 FNMA POOL 10254760 .ooo 4.906 AAA 101.910 136,869.14 .03
31371K5V9 5.000% 06/01/2018 DD 05/01/03 AAA 135,420.94 .03
60,193.59 FNMA POOL f0254866 .ooo 4.906 AAA 101.910 61,999.40 .01
31371LCB3 5.000% 09/01/2018 DD 08/01/03 AAA 61,343.38 .02
318,282.21 FNMA POOL f 0254953 .ooo 4.909 AAA 101.848 322,360.21 .08
31371LE21 5.000% 11/01/2018 DD 10/01/03 AAA 324,162.98 .08
(/
YLDANAL YIELD ANALYSIS PAGE 5
OCSF07522202 2004/09/30 RUN DATE l 10/04/04
DISTRICT& LONG-TERM OPERATING RUN TIME 09 .21.54 ======================================================--==============----= =================
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
864,896.51 FNMA POOL 10254987 .ooo 4.915 AAA 101.731 875,977.99 .24
31371LF46 5.ooot 12/01/2018 DD 11/01/03 AAA 879,867.83 .22
156,322.37 FNMA POOL 10323980 .ooo 5.706 AAA 105 .145 163,210.32 .04
31374T2MO 6.000% 04/01/2014 DD 09/01/99 AAA 164,364.42 .04
25,354.45 FNMA POOL f0357328 .ooo 4.912 AAA 101.790 26I115 • 08 .oo
31376J4M8 5.000% 01/01/2018 DD 01/01/03 AAA 25,800.25 .01
1,333,703.06 FNMA POOL 10357430 .ooo 4.906 AAA 101.910 1,348,707.22 .37
31376KA71 5.000% 09/01/2018 DD 09/01/03 AAA 1,359,178.92 .34
45,096.97 FNMA POOL 10456482 .ooo 5.706 AAA 105.145 47,084.04 .01
31381CCT2 6.000% 02/01/2014 DD 02/01/99 AAA 47,417.00 .01
125,792.21 FNMA POOL 10509649 .ooo s.106 AAA 105.145 131,334.93 .03
31383QEWO 6.000% 09/01/2014 DD 09/01/99 AAA 132,263.63 .03
122,183.34 FNMA POOL 10535451 .ooo 5. 713 AAA 105.020 127,567.04 .03
31384VZQ8 6.000% 06/01/2015 DD 07/01/00 AAA 128,316.37 .03
318,503.77 FNMA POOL 10555363 .ooo 4.905 AAA 101.941 328,058.87 .09
31385W5Yl 5.000% 04/01/2018 DD 03/01/03 AAA 324,687.23 .08
33,019.78 FNMA POOL 10555453 .ooo 4.905 AAA 101.941 33,442.85 .oo
3ll85XBW6 s.ooot 05/011201e DD 04/01/03 AAA 33,660.83 .01
263,865.95 FNMA POOL 10555545 .ooo 4.905 AAA 101.941 271,781.94 .01
lll85XBS2 5.ooot 06/011201e DD 05/01/03 AAA 268,988.67 .01
914,587.42 FNMA POOL 10555621 .ooo 4.915 AAA 101.731 924,876.53 .25
3138SXG68 5.ooot 0110112018 DD o&/01/03 AAA 930,418.89 .23
492,259.84 FNMA POOL 10681309 .ooo 4.905 AAA 101.941 507,027.63 .13
31391Y3S4 5.000% 02/01/2018 DD 02/01/03 AAA 501,816.62 .12
59,940.63 FNMA POOL 10681334 .ooo 4.905 AAA 101.941 61,738.85 .01
31391Y4T1 S.000% 02/01/2018 DD 01/01/03 AAA 61,104.32 .02
719,440.97 FNMA GTD REMIC P/T 02-76 PD .ooo 4.985 AAA 100.310 733,829.79 .19
31392FKF3 5.ooo• oa/25/2022 DD 10101102 AAA 721,674.11 .18
314,850.30 FNMA POOL 10684908 .ooo 4.905 AAA 101.941 318,884.33 .08
31400D3Rl S.000% 06/01/2018 DD 05/01/03 AAA 320,962.84 .08
YLDAHAL YIELD ANALYSIS PAGE 6
OCSF07522202 2004/09/30 RUN DATE 10/04/04
DISTRICTS LONG-TERM OPERATING RUN TIME 09.21.54
==========================~======================================================----==---o===--==--===========================
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARRBT VALUE % TOTAL
-------------------------------------------------------------------------------------------------
176,817.75 FNMA POOL 10685200 .ooo 4.905 AAA 101.941 179,083.24 .04
31400EGB7 5.000% 03/01/2018 DD 03/01/03 AAA 180,250.51 .04
30,581.20 FNMA POOL 10685665 .ooo 4.905 AAA 101.941 31,498.64 .oo
31400EW22 5.000% 02/01/2018 DD 02/01/03 AAA 31,174.91 .01
262,419.21 FNMA POOL 10686318 .ooo 4.905 AAA 101.941 270,291.79 .01
31400FPB7 5.000% 03/01/2018 DD 03/01/03 AAA 267,513.84 .07
104,370.76 FNMA POOL 10688739 .ooo 4.906 AAA 101. 910 107,501.88 .02
31400JEL9 5.000% 06/01/2018 DD 06/01/03 AAA 106,364.41 .03
84,537.99 FNMA POOL 10689859 .ooo 4.906 AAA 101. 910 85,621.14 .02
31400I<MG8 5.000% 05/01/2018 DD 05/01/03 AAA 86,152.80 .02
594,812.63 FNMA POOL 10693834 .ooo 4.905 AAA 101.941 612,657.00 .16
31400PY74 5.000% 03/01/2018 DD 03/01/03 AAA 606,360.38 .1s
212,146.76 FNMA POOL 10695852 .ooo 4.906 AAA 101.910 218,511.16 .05
31400SBVO 5.ooot 05/0112018 DD o5/0l/03 AAA 216,199.10 .os
703, 743.63 FNMA POOL 10695889 .ooo 4.906 AAA 101.910 724,855.95 .19
31400SC23 5.000% 05/01/2018 DD 05/01/03 AAA 717,186.26 .18
22,092.44 FNMA POOL 10697026 .ooo 4.905 AAA 101.941 22,755.23 .oo
31400TLF2 5.000% 05/01/2018 DD 04/01/03 AAA 22,521.34 .01
210,296.98 FNMA POOL 10702210 .ooo 4.915 AAA 101.731 216, 605. 88 .05
31401ADP9 5.000% 05/01/2018 DD 05/01/03 AAA 213,937.21 .os
129,939.53 FNMA POOL 10702328 .ooo 4.905 AAA 101.941 131,604.38 .OJ
31401ABD2 s.ooot 05/0112018 DD 04101/03 AAA 132,462.19 .03
264,680.93 FNMA POOL 10709148 .ooo 4.906 AAA 101.910 272,621.36 .07
31401BZM7 5.000% 06/01/2018 DD 06/01/03 AAA 269,736.76 .07
620,273.85 FNMA POOL 10709360 .ooo 4.906 AAA 101.910 628, 2.21.12 .17
31401JBS6 5.000% 07/01/2018 DD 06/01/03 AAA 632,122.07 .16
103,722.22 FNMA POOL 10709826 .ooo 4.906 AAA 101.910 105,051.16 .02
31401JSP4 5.000% 06/01/2018 DD 06/01/03 AAA 105,703.48 .03
219,226.92 FNMA POOL 10709917 .ooo 4.906 AAA 101.910 222,035.76 .06
31401JVJ4 5.000% 06/01/2018 DD 06/01/03 AAA 223,414.50 .06
"
YLDANAL YIELD ANALYSIS PAGE 7
OCSF07522202 2004/09/30 RUN DATE 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 09. 21. 54
=========================~=======================================----======================--====--==============--===============s
PAR VALUE YTM AT CURRENT MOODY MARI<ET TOTAL COST/ \ TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARRET VALUE \ TOTAL
-------------------------------------------------------------------------------------------------
18,201.79 FNMA POOL 10709963 .ooo 4.915 AAA 101.731 18,435.01 .oo
31401JWYO s.ooo\ 06/0112019 DD 06/01/03 AAA 18, 516. 86 .oo
582,815.86 FNMA POOL f0710235 .ooo 4.906 AAA 101.910 600,300.35 .16
31401KBC8 S.000\ 06/01/2018 DD 06/01/03 AAA 593,948.58 .15
15,893.50 FNMA POOL 10713344 .ooo 4.906 AAA 101.910 16,370.30 .oo
31401NPS2 5.000\ 06/01/2018 DD 06/01/03 AAA 16,197.09 .oo
256,335.02 FNMA POOL 10713365 .ooo 4.906 AAA 101.910 259,619.31 .01
31401NQS1 s.ooo\ 0110112018 DD 01101/03 AAA 261,231.43 .06
709,543.42 FNMA POOL 10720319 .ooo 4.906 AAA 101.910 718,634.44 .19
31401WG45 5.0001 07/01/2018 DD 07/01/03 AAA 723,096.83 .18
2,058,931.59 FNMA POOL 10720369 .ooo 4.915 AAA 101. 731 2,120,699.54 .57
31401WJNO 5.ooot 06/0112018 DD 06/01/03 AAA 2 ,094,571.61 .52
286,237.62 FNMA POOL 10721629 .ooo 4.906 AAA 101.910 294,824.77 .08
31401XVW4 5.000\ 07/01/2018 DD 06/01/03 AAA 291,705.22 .07
233,241.84 FNMA POOL 10723487 .ooo 4.906 AAA 101.910 235,865.81 .06
31402AX04 s.ooot 06/01/2018 DD 06/01/03 AAA 237,697.13 .06
391,186.70 FNMA POOL 10729601 .ooo 4.906 AAA 101.910 396,198.78 .10
31402BRW3 5.ooot 07/01/2018 DD 07/01/03 AAA 398,658.99 .10
33,344.72 FNMA POOL 10732873 .ooo 4.907 AAA 101.891 33,771.93 .oo
31402MFN5 5.ooot 11/01/2018 DD 10/01/03 AAA 33,975.41 .01
648,278.50 FNMA POOL 10737130 .ooo 4.906 AAA 101.910 656,584.57 .18
31402S4P9 5.ooot 1010112018 DD 10/01/03 AAA 660,661.66 .16
517,728.23 FNMA POOL 10738211 .ooo 4.915 AAA 101. 731 524,361.64 .14
31402UDQ2 5.ooo' 1010112018 DD 10/01/03 AAA 526,690.08 .13
186, 832. 71 FNMA POOL 10738487 .ooo 4.909 AAA 101.848 189,226.50 .os
31402UNC2 s.ooot 1010112018 DD 10/01/03 AAA 190,284.74 .os
673,747.59 FNMA POOL 10740471 .ooo 4.915 AAA 101. 731 682,379.96 .18
31402WT40 5.000% 10/01/2018 DD 10/01/03 AAA 685,410.13 .11
745,479.74 FNMA POOL 10740748 .ooo 4.906 AAA 101.910 755,031.19 .20
3140291587 5.000\ 10/01/2018 DD 11/01/03 AAA 759,719.60 .19
YLDAHAL YIELD ANALYSIS PAGE 8
OCSF07522202 2004/09/30 RUN DATE 10/04/04
DISTRICTS LONG-TERM OPERATING RUN TIME I 09 .21. 54 ===============================--===============================----======-----===s========--========================--=========
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
37,509.11 FNMA POOL 10743869 .ooo 4.915 AAA 101.731 37,989.69 .01
31403BMR1 5.000% 11/01/2019 DD 10/01/03 AAA 38,158.39 .01
976,392.39 FNMA POOL 10744008 .ooo 4.906 AAA 101.910 988,902.41 .27
31403BR54 5.000% 07/01/2018 DD 09/01/03 AAA 995,043.05 .25
153,543.48 FNMA POOL 10744316 .ooo 4.915 AAA 101.731 155,510.76 .04
31403B3Z4 5.000% 09/01/2018 DD 09/01/03 AAA 156, 201. 31 .04
340,171.47 FNMA POOL 10747914 .ooo 4.909 AAA 101.848 344,529.92 .09
31403F3XO 5.000% 11/01/2018 DD 11/01/03 AAA 346,456.68 .09
203,586.21 FNMA POOL 10748400 .ooo 4.915 AAA 101.731 206I194 o 66 .os
31403GNR9 5.000% 09/01/2018 DD 09/01/03 AAA 207,110.28 .05
918,874.30 FNMA POOL 10748899 .ooo 4.911 AAA 101.810 930,647 .37 .25
31403G7LO S.000% 12/01/2018 DD 11/01/03 AAA 935,505.06 .23
2,114,955.59 FNMA POOL 10750377 .ooo 4.911 AAA 101.810 2,142,053.46 .59
31403JUA2 S.000% 11/01/2018 DD 11/01/03 AAA 2,153,234.30 .53
1,884,100.47 FNMA POOL 10750380 .ooo 4.911 AAA 101.810 1,908,240.53 .52
31403JUD6 5.000% 11/01/2018 DD 11/01/03 AAA 1,918,200.92 .48
168,149.99 FNMA POOL 10750445 .ooo 4.911 AAA 101.810 170,304.42 .04
31403JWE2 5.000% 11/01/2018 DD 11/01/03 AAA 171,193.35 .04
795,318.64 FNMA POOL 10751960 .ooo 4.915 AAA 101.731 805,508.67 .22
31403LMB1 5.000% 12/01/2018 DD 11/01/03 AAA 809,085.57 .20
839,403.29 FNMA POOL 10753425 .ooo 4.914 AAA 101.754 849,108.88 .23
31403NA23 5.000% 11/01/2018 DD 11/01/03 AAA 854,125.67 .21
589,478.11 FNMA POOL 10755165 .ooo 4.909 AAA 101.848 597,030.80 .16
31403Q6A3 5.000% 12/01/2018 DD 11/01/03 AAA 600,369.66 .15
915,669.20 FNMA POOL 10756372 .ooo 4.909 AAA 101.848 926,256.62 .25
31403SJR8 5.000% 11/01/2018 DD 11/01/03 AAA 932,587.65 .23
10,880.44 GNMA POOL 10421389 .ooo 6.124 AAA 106.133 11,419.37 .oo
36206UC23 6.500% 04/15/2026 DD 04/01/96 AAA 11,547.72 .oo
19,939.53 GNMA POOL 10449851 .ooo 6.157 AAA 105.566 20,927.17 .oo
3620BFWLO 6.500% 01/15/2028 DD 01/01/98 AAA 21,049.37 .01
()
YLDANAL YIELD ANALYSIS PAGE 9
OCSF07522202 2004/09/30 RUN DATE I 10/04/04
DISTRICTS LONG-TERM OPERATING RUN TIME I 09.21.54
=====================================================================================================================~========
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE ' TOTAL -------------------------------------------------------------------------------------------------
36,672.86 GNMA POOL 10466845 .ooo 6.130 AAA 106.039 38,489.31 .01
36209BTA6 6.500% 06/15/2028 DD 06/01/98 AAA 38,887.56 .01
111,518.20 GNMA POOL 10468052 .ooo 6.130 AAA 106.039 117, 041.83 .03
36209C5M4 6.500% 07/15/2028 DD 07/01/98 AAA 118,252.85 .03
154,360.22 GNMA POOL 10476041 .ooo 6.130 AAA 106.039 161,764.70 .04
36209MZE7 6.500% 06/15/2028 DD 06/01/98 AAA 163,682.13 .04
121,178.19 GNMA POOL 10478626 .ooo 6.130 AAA 106.039 126,990.96 .03
36209QVT9 6.500% 01/15/2029 DD 01/01/99 AAA 128, 496. 21 .03
28,890.97 GNMA POOL 10480598 .ooo 6.130 AAA 106.039 30,276.82 .oo
36209S3F6 6.500% 10/15/2028 DD 10/01/98 AAA 30,635.71 .01
8,429.36 GNMA POOL 10512235 .ooo 6.133 AAA 105.977 8,846.87 .oo
36211GBC6 6.500% 11/15/2029 DD 11/01/99 AAA 8,933.15 .oo
106,866.10 GNMA POOL 10514326 .ooo 6.130 AAA 106.039 111,992.33 .03
36211JLF2 6.500% 07/15/2029 DD 07/01/99 AAA 113,319.81 .03
197,873.22 GNMA II POOL 10080395 .ooo 3.342 AAA 100.996 196,080.00 .os
36225CNM4 VAR RT 04/20/2030 DD 04/01/00 AAA 199,843.48 .os
1,781,830.04 GNMA II POOL I080408X .ooo 3.342 AAA 100.995 1,763,733.32 .49
36225CN28 6.500% 05/20/2030 DD 05/01/00 AAA 1, 799,561.57 .45
379,619.49 GNMA II POOL 10080900 .ooo 3.020 AAA 99.352 369,357.89 .10
36225DAA2 VAR RT OS/20/2034 DD 05/01/04 AAA 377,160.SO .09
1,394,813.52 GNMA II POOL 10080965 .ooo 3.481 AAA 100.542 1,393,941.75 .38
36225DCB8 VAR RT 07/20/2034 DD 07/01/04 AAA 1,402,373.69 .35
3,000,000.00 GENERAL MTRS ACCEP CORP SR NT .ooo 5.813 Al 105.359 3,064,350.00 .86
370425SD3 6.125% 08/28/2007 DD 08/29/02 BBB 3,160,770.00 .78
900,000.00 GOLDMAN SACHS GRP MTN ITR00207 .ooo 1.977 AA3 100.140 900,000.00 .21
38141EJQ3 VAR RT 07/23/2009 DD 07/23/04 A+ eo1,120.oo .20
3,000,000.00 GOLDMAN SACHS GROUP INC SR NT .ooo 4.047 AA3 101. 921 3,030,030.00 .83
38141GCS1 4.125% 01/15/2008 DD 01/13/03 A+ 3,057,630.00 .76
3,000,000.00 RR.AFT FOODS INC HT .ooo 1.960 Al 99.984 2,999,910.00 .82
50075NAJ3 VAR RT 11/26/2004 DD 11/26/02 BBB+ 2,999,520.00 • 74
YLDANAL YIELD ANALYSIS PAGE 10
OCSF07522202 2004/09/30 RUN DATE 10/04/04
DISTRICTS LONG-TERM OPERATING RUN TIME 09.21.54
============================================---=~==---======---== --====-----===============--=====
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
3,200,000.00 MORGAN STANLEY NT .ooo 3.874 AA3 100.015 3,149,248.00 .87
61746BALO 3.875% 01/15/2009 DD 01/13/04 A+ 3,200,480.00 .79
779,923.69 RESIDENTIAL ASSET 03-RSll AIIB .ooo 2.173 AAA 99.844 779,923.69 .21
760985K83 VAR RT 12/25/2033 DD 12/30/03 AAA 778,705.45 .19
2,985,923.50 SBA GTD DEV PARTN 2001-20C l .ooo S.852 AAA 108.345 2,985,923.50 .es
83162CLJO 6.340% 03/01/2021 AAA 3,235,098.82 .80
1, 920, 261.52 SBA GTD PARTH CTFS SBIC-PS 01 .ooo 6.124 AAA 108.420 1,920,261.52 .57
831641DD4 6.640% 02/10/2011 DD 02/21/01 NR 2,081,947.54 .52
1,600,000.00 UNITED AIRLS PASSTBRU 01-1 c .ooo 78.409 WR e. 112 1,600,000.00 .03
909317BC2 6.831% 03/01/2010 DD 08/22/01 A-139,392.00 .03
20,000,000.00 U S TREASURY NOTES .ooo 5.782 AAA 108.094 22,620,312.50 5.92
9128272JO 06.250% 02/15/2007 DD 02/15/97 AAA 21,ne,eoo.oo 5.36
3,522,270.00 US TREASURY INFLATION INDEX NT .ooo 3.305 AAA 109.688 3,831,771.35 1.05
9128273T7 3.625% 01/15/2008 DD 01/15/98 AAA 3,863,489.91 .96
15,035,670.00 US TREASURY INFLATION INDEX NT .ooo 3.442 AAA 112.594 16,661,030.11 4.64
9128274Y5 3.875% 01/15/2009 DD 01/15/99 AAA 16,929,262.28 4.20
3,900,000.00 U S TREASURY NOTES .ooo 5.535 AAA 103.890 4,288,149.14 1.11
912827697 05.750% 11/15/2005 DD 11/15/00 AAA 4,051,729.50 1.01
17,600,000.00 U S TREASURY NOTES .ooo 3.353 AAA 100.660 17,405,000.00 4.85
912828BT6 3.375% 12/15/2008 DD 12/15/03 AAA 17,716,160.00 4.40
61,000,000.00 U S TREASURY NOTES .ooo 1.886 AAA '9.440 60,967, 721.21 16.63
912828BX7 1.875% 01/31/2006 DD 01/31/04 AAA 60,658,400.00 15.05
11,000,000.00 U S TREASURY NOTES .ooo 1.642 AAA 98.984 17,045,156.25 4.61
912828CB4 1.625% 02/28/2006 DD 02/29/04 AAA 16,827,344.60 4.17
33,000,000.00 U S TREASURY NOTES .ooo 2.256 AAA 99.740 32,835,000.00 9.02
912828CF5 2.250% 04/30/2006 DD 04/30/04 AAA 32,914,200.00 8.17
21,soo,000.00 U S TREASURY NOTES .ooo 2.738 AAA 100.440 27,463,468.63 7.57
912828CMO 2.750% 06/30/2006 DD 06/30/04 AAA 21,n1,ooo.oo 6.85
20,100,000.00 U S TREASURY NOTES .ooo 2.739 AAA 100.410 20,1os,556.41 5.70
912828CQ1 2.750% 07/31/2006 DD 07/31/04 AAA 20,784,870.00 S.16
.,,
YLDANAL YIELD ANALYSIS PAGE 11
OCSF07522202 2004/09/30 RUN DATE 10/04/04
DISTRICT: LONG-TERM OPERATING RUN TIME I 09.21.54
=================================================================================----====~========~==========================~
PAR VALUE YTM AT CURRENT MOODY MARKET 'l'OTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOR YIELD S-P PRICE MARKET VALUE % TOTAL
-------------------------------------------------------------------------------------------------
1,1so,ooo.oo VIRGINIA ELEC & PWR 01 SER A .ooo S.527 Al 104.031 1,743,840.00 .49
927804ENO 5.750% 03/31/2006 DD 03/27/01 BBB+ 1 1 820,542.SO .45
16,760,940.00 US TREASURY INFLATION INDEX NT 3.817 3.158 AAA 106.875 14,842,998.33 4 .91
9128272M3 3.375% 01/15/2007 DD 01/15/97 AAA 17,913,254.63 4.44
1s,soo,ooo.oo FEDERAL NATL MTG ASSN DEBS 5.967 6.991 AAA 101.911 16, 154, 410. 00 4.33
31359MFB1 7.125% 02/15/2005 DD 02/14/00 AAA 15,796,195.70 3.92
873,311.34 FBI.MC MULTICLASS MTG SER E3 A 6.316 3.621 AAA 100.296 874,241.70 .24
3133TCE95 VAR RT 08/15/2032 DD 12/01/97 AAA 875,896.34 .22
541,639.63 GNMA GTD REMIC TR 2000-9 FB 6.320 2.263 AAA 100.706 541,639.63 . u
3837B4NX9 VAR RT 02/16/2030 AAA 545,463.61 .14
235,705.78 GNMA II POOL f080088M 6.705 3.340 AAA 101.038 240,861.85 .06
36225CC20 7.375% 06/20/2027 DD 06/01/97 AAA 238,153.42 .06
173,866.12 GNMA II POOL 10080023 6 .992 4.536 AAA 101.960 176,745.77 .04
36225CAZ9 VAR RT 12/20/2026 DD 12/01/96 AAA 177,273.37 .04
2,100,000.00 FEDERAL NATL MTG ASSN DEBS 7.113 5.873 AAA 112.802 2,030,133.00 .64
31359MEY5 6.625% 09/15/2009 DD 09/01/99 AAA 2,368,840.74 .59
1,000,000.00 FORD MOTOR CR CO NT 7.582 6.587 Al 102.468 965, 170. 00 .28
345397GV9 6.750% 05/15/2005 DD 05/24/93 BBB-1,024,680.00 .25
938,747.75 WMP/BUNTOON PAIGE t000-11150 7.684 7.450 AAA 100.674 918,359.32 .25
302998GE3 7.500\ 12/01/2030 DD 10/21/99 AAA 945,072.38 .23
3,000,000.00 PACIFICORP SECD MTN ITR 00115 7.709 7.282 Al 100.250 2,950,530.00 .82
69512EEU5 7.300\ 10/22/2004 DD 10/22/92 A 3,007,500.00 .75
YLDANAL
OCSF07522202
DISTRICTt LONG-TERM OPERATING
YIELD ANALYSIS
2004/09/30
PAGE
RUH DATE
RUH TIME
12
t 10/04/04
I 09.21.54
================================~=================~========================================================c==================
PAR VALUE
SECURITY ID SECURITY DESCRIPTION
1 1 600,000.00 ALLSTATE CORP SR HT
020002AL5 7.875% 05/01/2005 DD 05/01/00
TOTAL FIXED INCOME SECURITIES
TOTAL
YTH AT CURRENT MOODY
BOOK YIELD S-P
MARKET
PRICE
7.967 7.640 Al 103.078
A+
.112 4.365
.168 4.276
TOTAL COST/
MARKET VALUE
1,594,032.00
1,649,248.00
362,801,965.56
364,600,019.34
401,294,064.09
403, o~n, 111 .a1
======::s===
' TYPE
' TOTAL
.45
.u
100.00
90.46
100.00
100.00 ========
Asset Detail Report m: GLB013
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOUDATED • OCSGOOO 10000 9 / 30 /2004 Status: FINAL
Mellon
U.S. DOLLAR
CASH & CASH EQUIVALENTS
PAYABLE FOR INVESTMENTS -42,281,359.65 -42,281,359.65 -9.70% 0.00
PURCHASED
INTEREST RECEIVABLE 2,540,429.69 2,540,429.69 0.58% 0.00
RECEIVABLE FOR INVESTMENTS 26,840.70 26,840.70 0.01% 0.00
SOLD
BANK OF AMERICA NA INSTL C/D 100.0000 2,200,000.000 2,200,000.00 2,200,000.00 0.50% 0.00
1.620% 11/02/2004 DD 08/06/04
SEC ID: 06050GEM8
FEDERAL HOME LN BK CONS DISC 99.6006 700,000.000 697,204.28 697,204.28 0.16% 0.00
SEC ID: 313384P37
FEDERAL HOME LN BKS CONS DISC 99.7164 8,400,000.000 8,376,181.33 8,376,181.33 1.92% 0.00
MAT 11/19/2004
SEC ID: 313384Q28
FEDERAL HOME LN BK CONS DISC N 99.5576 8,600,000.000 8,561,616.67 8,561,616.67 1.96% 0.00
MAT 12/08/2004
SEC ID: 313384S59
FEDERAL HOME LN MTG CORP DISC 99.6006 7 ,300,000.000 7,270,844.61 7,270,844.61 1.67% 0.00
MAT 11/09/2004
SEC ID: 313396N82
FEDERAL HOME LN MTG CORP DISC 99.5860 1,000,000.000 995,860.00 995,860.00 0.23% 0.00
MAT 11/16/2004
SEC ID: 313396P72
FEDERAL HOME LN MTG CORP DISC 99.4461 400,000.000 397,784.56 397,784.56 0.09% 0.00
MAT 11/24/2004
SEC ID: 313396Q7 l
FEDERAL HOME LN MTG CORP DISC 99.5451 6,100,000.000 6,072,251.78 6,072,251. 78 1.39% 0.00
MAT 12/14/2004
SEC ID: 313396T37
FEDERAL NATL MTG ASSN DISC NT 99.5975 1,800,000.000 1,792,755.00 1,792,755.00 0.41% 0.00
MAT 11/3/2004
SEC ID: 313588N27
FEDERAL NATL MTG ASSN DISCOUNT 99.7663 700,000.000 698,364.14 698,364.14 0.16% 0.00
MAT 11/15/2004
SEC ID: 313588P66
FEDERAL NATL MTG ASSN DISCOUNT 99.6040 8,200,000.000 8,167,186.89 8,167,186.89 1.87% 0.00
MAT 11/17 /2004
SEC ID: 313588P82
FEDERAL NATL MTG ASSN DISCOUNT 99.5804 4,800,000.000 4,779,757.55 4,779,757.55 1.10% 0.00
MAT 11/24/2004
SEC ID: 313588Q73
10/11/2004 10:41:38AM PDT 1 Workbench
fb Mellon
OCSD-CONSOLlDATED • OCSGOOO 10000
FEDERAL NATL MTG ASSN DISCOUNT
MAT 11/29/2004
SEC ID: 313588R49
FEDERAL NATL MTG ASSN DISCOUNT
MAT 12/01/2004
SEC ID: 313588R64
FEDERAL NATL MTG ASSN DISCOUNT
MAT 12/08/2004
SEC ID: 313588S55
FEDERAL NATL MTG ASSN DISC NTS
MAT 12/ 15/2004
SEC ID: 313588T4 7
FEDERAL NATL MTG ASSN DISCOUNT
MAT 12/22/2004
SEC ID: 313588U37
GENERAL ELEC CAP DISC
11/16/2004
SEC ID: 36959HLGO
GENERAL ELEC CAP DISC
12/02/2004
SEC ID: 36959HM20
U S TREASURY BILL
DUE 11/04/2004 DD 05/06/2004
SEC ID: 912795RK9
U S TREASURY BILL
DUE 11/12/2004 DD 05/13/2004
SEC ID: 912795RL7
U S TREASURY BILL
DUE 11/18/2004 DD 05/20/2004
SEC ID: 912795RM5
U S TREASURY BILL
DUE 11/26/2004 DD 05/27 /2004
SEC ID: 912795RN3
U S TREASURY BILL
DUE 03/31/2005 DD 09/30/2004
SEC ID: 912795SG7
WELLS FARGO BANK NA INSTL C/D
1.650% 10/07 /2004 DD 09/09/04
SEC ID: 9497P1BU2
WELLS FARGO BANK NA INSTL C/D
1.600% 10/04/2004 DD 08/30/04
SEC ID: 9497P1CL1
10/11/2004 10:41:38AM PDT
99.6650
99.5909
99.5551
99.5676
99.5324
99.4499
99.5604
99.6297
99.5999
99.6441
99.6137
99.0246
100.0000
100.0000
Asset Detail
by Currency
9/30/2004
1, 100,000.000
10,000,000.000
200,000.000
400,000.000
3,600,000.000
500,000.000
200,000.000
5,600,000.000
2,000,000.000
5,000,000.000
5,000,000.000
16,000,000.000
l, 100,000.000
2,200,000.000
2
1,096,315.00
9,957,853.28
199,110.22
398,270.44
3,583,165.00
497,249.58
199,120.89
5,579,262.11
1,991,997.50
4,982,207.29
4,980,686.39
15,843,937.78
1,100,000.00
2,200,000.00
Report m: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
1,096,315.00 0.25%
9,957,853.28 2.28%
199,110.22 0.05%
398,270.44 0.09%
3,583,165.00 0.82%
497,249.58 0.11%
199,120.89 0.05%
5,579,262.11 1.28%
1,991,997.50 0.46%
4,982,207.29 1.14%
4,980,686.39 1.14%
15,843,937.78 3.63%
1,100,000.00 0.25%
2,200,000.00 0.50%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Workbench
~ Mellon
OCSD-CONSOUDATED-OCSGOOOlOOOO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
TOTAL CASH & CASH EQUIVALENTS
FIXED INCOME SECURITIES
AIG SUNAMERICA GLOBAL REG S
5.850% 08/01/2008 DD 08/08/01
SEC ID: U00907 AAO
COMMIT TO PUR FNMA SF MTG
5.000% 10/01/2019 DD 10/01/04
SEC ID: 01F0504Al
COMMIT TO PUR FNMA SF MTG
5.500% 10/01/2034 DD 10/01/04
SEC ID: 01F0526A5
ALLSTATE CORP SR NT
7.875% 05/01/2005 DD 05/01/00
SEC ID: 020002AL5
ASSOCIATES CORP NORTH AMER SR
6.625% 06/15/2005 DD 06/09/95
SEC ID: 046003FF1
DU PONT EI DE NEMOURS & CO NT
6.750% 10/15/2004 DD 10/20/99
SEC ID: 263534BH 1
WMP/HUNTOON PAIGE #000-11150
7.500% 12/01/2030 DD 10/21/99
SEC ID: 302998GE3
FEDERAL HOME LN BK CONS BOS
7.125% 02/15/2005 DD 02/08/00
SEC ID: 3133MAUN7
FHLMC MULTICLASS MTG SER E3 A
VAR RT 08/15/2032 DD 12/01/97
SEC ID: 3133TCE95
FHLMC GROUP #78-6064
6.384% 01/01/2028 DD 12/01/97
SEC ID: 31348SWZ3
FEDERAL NATL MTG ASSN DEBS
6.625% 09/15/2009 DD 09/01/99
SEC ID: 31359MEY5
FEDERAL NATL MTG ASSN DEBS
7.125% 02/15/2005 DD 02/14/00
SEC ID: 31359MFH1
10/11/2004 10:41 :38AM PDT
100.0000
109.8670
101.5625
101.2969
103.0780
102.7650
100.1400
100.6737
101.8954
100.2960
102.5248
112.8019
101.9109
Asset Detail
by Currency
9/30/2004
1,232,962.470 1,232,962.47
104,332,962.470 64, 137,855.50
752,000.000 826,199.84
22,000,000.000 22,381,562.50
4,000,000.000 4,055,859.37
1,600,000.000 1,594,032.00
3 ,000,000.000 3,112,350.00
1,575,000.000 1,589,663.25
938,747.750 918,359.32
3,500,000.000 3 '732,225.00
873,311.340 874,241.70
63,273.510 61,731.20
2, 100,000.000 2,030,133.00
15,500 ,000.000 16,154,410.00
3
Report m: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
1,232,962.47 0.28% 0.00
64, 137,855.50 14.71% 0.00
826,199.84 0.19% 0.00
22,343,750.00 5.13% -37,812.50
4,051,875.20 0.93% -3,984.17
1,649 ,248.00 0.38% 55,216.00
3,082,950.00 0.71% -29,400.00
1,577 ,205.00 0.36% -12,458.25
945,072.38 0.22% 26,713.06
3,566,338.65 0.82% -165,886.35
875,896.34 0.20% 1,654.64
64,871.04 0.01% 3,139.84
2,368,840. 74 0.54% 338,707.74
15,796,195.70 3.62% -358,214.30
Workbench
8 Mellon
OCS~ONSOUDATED-OCSGOOOlOOOO
FEDERAL NATL MTG ASSN DEBS 104.2187
5.250% 06/15/2006 DD 06/22/01
SEC ID: 31359MJX2
FNMA POOL #0254510 101.9414
5.000% 11/01/2017 DD 10/01/02
SEC ID: 31371KVB4
FNMA POOL #0254631 101.9414
5.000% 02/01/2018 DD 01/01/03
SEC ID: 31371KY47
FNMA POOL #0254760 101.9102
5.000% 06/01/2018 DD 05/01/03
SEC ID: 31371K5V9
FNMA POOL #0254866 101.9102
5.000% 09/01/2018 DD 08/01/03
SEC ID: 31371LCB3
FNMA POOL #0254953 101.8477
5.000% 11/01/2018 DD 10/01/03
SEC ID: 31371LE21
FNMA POOL #0254987 101.7310
5.000% 12/01/2018 DD 11/01/03
SEC ID: 31371LF46
FNMA POOL #0323980 105.1445
6.000% 04/01/2014 DD 09/01/99
SEC ID: 31374T2MO
FNMA POOL #0357328 101.7898
5.000% 01/01/2018 DD 01/01/03
SEC ID: 31376J4M8
FNMA POOL #0357430 101.9102
5.000% 09/01/2018 DD 09/01/03
SEC ID: 31376KA7 l
FNMA POOL #0456482 105.1445
6.000% 02/01/2014 DD 02/01/99
SEC ID: 31381CCT2
FNMA POOL #0509649 105.1445
6.000% 09/01/2014 DD 09/01/99
SEC ID: 31383QEWO
FNMA POOL #0535451 105.0195
6.000% 06/01/2015 DD 07 /01/00
SEC ID: 31384VZQ8
FNMA POOL #0555363 101.9414
5.000% 04/01/2018 DD 03/01/03
SEC ID: 31385W5Yl
10/11/2004 10:41:38AM PDT
Asset Detail
by Currency
9/30/2004
11,350,000.000
694,374.270
149,427.460
132,882.670
60,193.590
318,282.210
864,896.510
156,322.370
25,354.450
1,333,703.060
45,096.970
125,792.210
122,183.340
318,503.770
4
11,521,271.50
715,205.49
153,910.29
136,869.14
61,999.40
322,360.21
875,977.99
163,210.32
26,115.08
1,348,707.22
47,084.04
131,334.93
127,567.04
328,058.87
Report ID: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
11,828,822.45 2.71% 307,550.95
707,854.92 0.16% -7,350.57
152,328.46 0.03% -1,581.83
135,420.94 0.03% -1,448.20
61,343.38 0.01% -656.02
324,162.98 0.07% 1,802.77
879,867.83 0.20% 3,889.84
164,364.42 0.04% 1,154.10
25,808.25 0.01% -306.83
1,359, l 78. 92 0.31% 10,471.70
47,417.00 0.01% 332.96
132,263.63 0.03% 928.70
128,316:37 0.03% 749.33
324,687.23 0.07% -3,371.64
Workbench
I}
@ Mellon
OCSD-CONSOUDATED-OCSGOOO 10000
FNMA POOL #0555453
5.000% 05/01/2018 DD 04/01/03
SEC ID: 31385XBW6
FNMA POOL #0555545
5.000% 06/01/2018 DD 05/01/03
SEC ID: 31385XES2
FNMA POOL #0555621
5.000% 07 /01/2018 DD 06/01/03
SEC ID: 31385XG68
FNMA POOL #0681309
5.000% 02/01/2018 DD 02/01/03
SEC ID: 31391Y3S4
FNMA POOL #0681334
5.000% 02/01/2018 DD 01/01/03
SEC ID: 31391Y4Tl
FNMA GTD REMIC P /T 02-76 PD
5.000% 08/25/2022 DD 10/01/02
SEC ID: 31392FKF3
FNMA POOL #0684908
5.000% 06/01/2018 DD 05/01/03
SEC ID: 31400D3Rl
FNMA POOL #0685200
5.000% 03/01/2018 DD 03/01/03
SEC ID: 31400EGH7
FNMA POOL #0685665
5.000% 02/01/2018 DD 02/01/03
SEC ID: 31400EW22
FNMA POOL #0686318
5.000% 03/01/2018 DD 03/01/03
SEC ID: 31400FPB7
FNMA POOL #0688739
5.000% 06/01/2018 DD 06/01/03
SEC ID: 3 l 400JEL9
FNMA POOL #0689859
5.000% 05/01/2018 DD 05/01/03
SEC ID: 31400KMG8
FNMA POOL #0693834
5.000% 03/01/2018 DD 03/01/03
SEC ID: 31400PY74
FNMA POOL #0695852
5.000% 05/01/2018 DD 05/01/03
SEC ID: 31400SBVO
10/11/2004 10:41:38AM PDT
101.9414
101.9414
101.7310
101.9414
101.9414
100.3104
101.9414
101.9414
101.9414
101.9414
101.9102
101.9102
101.9414
101.9102
Asset Detail
by Currency
9/30/2004
33,019.780
263,865. 950
914,587.420
492,259.840
59,940.630
719,440.970
314,850.300
176,817.750
30,581.200
262,419.210
104,370.760
84,537.990
594,812.630
212,146.760
5
33,442.85
271,781.94
924,876.53
507,027.63
61,738.85
733,829.79
318,884.33
179,083.24
31,498.64
270,291.79
107,501.88
85,621.14
612,657.00
218,511.16
Report m: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
33,660.83 0.01% 217.98
268,988.67 0.06% -2,793.27
930,418.89 0.21% 5,542.36
501,816.62 0.12% -5,211.01
61,104.32 0.01% -634.53
721,674.11 0.17% -12,155.68
320,962.84 0.07% 2,078.51
180,250.51 0.04% 1,167.27
31,174.91 0.01% -323.73
267,513.84 0.06% -2,777.95
106,364.41 0.02% -1,137.47
86,152.80 0.02% 531.66
606,360.38 0.14% -6,296.62
216,199.10 0.05% -2,312.06
Workbench
fb Mellon
OCSD-CONSOUDATED -OCSGOOO 10000
FNMA POOL #0695889 101.9102
5.000% 05/01/2018 DD 05/01/03
SEC ID: 31400SC23
FNMA POOL #0697026 101.9414
5.000% 05/01/2018 DD 04/01/03
SEC ID: 31400TLF2
FNMA POOL #0702210 101.7310
5.000% 05/01/2018 DD 05/01/03
SEC ID: 31401ADP9
FNMA POOL #0702328 101.9414
5.000% 05/01/2018 DD 04/01/03
SEC ID: 31401AHD2
FNMA POOL #0709148 101.9102
5.000% 06/01/2018 DD 06/01/03
SEC ID: 31401HZM7
FNMA POOL #0709360 101.9102
5.000% 07 /01/2018 DD 06/01/03
SEC ID: 31401JB56
FNMA POOL #0709826 101.9102
5.000% 06/01/2018 DD 06/01/03
SEC ID: 31401JSP4
FNMA POOL #0709917 101.9102
5.000% 06/01/2018 DD 06/01/03
SEC ID: 31401JVJ4
FNMA POOL #0709963 101.7310
5.000% 06/01/2018 DD 06/01/03
SEC ID: 31401JWYO
FNMA POOL #0710235 101.9102
5.000% 06/01/2018 DD 06/01/03
SEC ID: 31401KBC8
FNMA POOL #0713344 101.9102
5.000% 06/01/2018 DD 06/01/03
SEC ID: 31401NP52
FNMA POOL #0713365 101.9102
5.000% 07 /01/2018 DD 07 /01/03
SEC ID: 31401NQS1
FNMA POOL #0720319 101.9102
5.000% 07 /01/2018 DD 07 /01/03
SEC ID: 31401WG45
FNMA POOL #0720369 101.7310
5.000% 06/01/2018 DD 06/01/03
SEC ID: 31401WJNO
10/11/2004 10:41:38AM PDT
Asset Detail
by Currency
9/30/2004
703,743.630
22,092.440
210,296. 980
129,939.530
264,680.930
620,273.850
103,722.220
219,226.920
18,201.790
582,815.860
15,893.500
256,335.020
709,543.420
2,058,931.590
6
724,855.95
22,755.23
216,605.88
131,604.38
272,621.36
628,221.12
105,051.16
222,035.76
18,435.01
600,300.35
16,370.30
259,619.31
718,634.44
2,120,699.54
Report m: GLS013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
717,186.26 0.16% -7,669.69
22,521.34 0.01% -233.89
213,937.21 0.05% -2,668.67
132,462.19 0.03% 857.81
269,736.76 0.06% -2,884.60
632,122.07 0.15% 3,900.95
105,703.48 0.02% 652.32
223,414.50 0.05% 1,378.74
18,516.86 0.00% 81.85
593,948.58 0.14% -6,351.77
16,197.09 0.00% -173.21
261,231.43 0.06% 1,612.12
723,096.83 0.17% 4,462.39
2 ,094 ,571.61 0.48% -26,127.93
Workbench ,,
@ Mellon
OCSD-CONSOUDATED • OCSGOOO 10000
FNMA POOL #0721629
5.000% 07 /01/2018 DD 06/01/03
SEC ID: 31401XVW4
FNMA POOL #0723487
5.000% 06/01/2018 DD 06/01/03
SEC ID: 31402AXQ4
FNMA POOL #0729601
5.000% 07 /01/2018 DD 07 /01/03
SECID:31402HR'W3
FNMA POOL #0732873
5.000% 11/01/2018 DD 10/01/03
SEC ID: 31402MFN5
FNMA POOL #0737130
5.000% 10/01/2018 DD 10/01/03
SEC ID: 31402S4P9
FNMA POOL #0738211
5.000% 10/01/2018 DD 10/01/03
SEC ID: 31402UDQ2
FNMA POOL #0738487
5.000% 10/01/2018 DD 10/01/03
SEC ID: 31402UNC2
FNMA POOL #0740471
5.000% 10/01/2018 DD 10/01/03
SEC ID: 31402'WT40
FNMA POOL #0740748
5.000% 10/01/2018 DD 11/01/03
SEC ID: 31402'W5H7
FNMA POOL #0743868
5.000% 11/01/2018 DD 10/01/03
SEC ID: 31403BMR1
FNMA POOL #0744008
5.000% 07 /01/2018 DD 09/01/03
SEC ID: 31403BR54
FNMA POOL #0744316
5.000% 09/01/2018 DD 09/01/03
SEC ID: 3140383Z4
FNMA POOL #0747914
5.000% 11/01/2018 DD 11/01/03
SEC ID: 31403F3XO
FNMA POOL #0748400
5.000% 08/01/2018 DD 09/01/03
SEC ID: 31403GNR9
10/ 11/2004 10:41:38AM PDT
101.9102
101.9102
101.9102
101.8914
101.9102
101.7310
101.8477
101.7310
101.9102
101.7310
101.9102
101.7310
101.8477
101.7310
Asset Detail
by Currency
9/30/2004
286,237.620
233,241.840
391,186.700
33,344.720
648,278.500
517. 728.230
186,832.710
673,747.590
745,479.740
37,509.110
976,392.390
153,543.480
340, 171.4 70
203,586.210
7
294,824.77
235,865.81
396,198.78
33,771.93
656,584.57
524,361.64
189,226.50
682,379.96
755,031.19
37,989.69
988,902.41
155,510.76
344,529.92
206,194.66
Report m: GL8013
Base Currency: USD
Altemate Base Currency:
Exchange Rate:
Status: FINAL
291,705.22 0.07% -3,119.55
237,697.13 0.05% 1,831.32
398,658.99 0.09% 2,460.21
33,975.41 0.01% 203.48
660,661.66 0.15% 4,077.09
526,690.08 0.12% 2,328.44
190,284.74 0.04% 1,058.24
685,410.13 0.16% 3,030.17
759,719.60 0.17% 4,688.41
38,158.39 0.01% 168.70
995,043.05 0.23% 6,140.64
156,201.31 0.04% 690.55
346,456.68 0.08% 1,926.76
207,110.28 0.05% 915.62
Workbench
~ Mellon
OCSIJ.CONSOUDATED-OCSGOOOlOOOO
FNMA POOL #0748899
5.000% 12/01/2018 DD 11/01/03
SEC ID: 31403G7LO
FNMA POOL #0750377
5.000% 11/01/2018 DD 11/01/03
SEC ID: 3 l 403JUA2
FNMA POOL #0750380
5.000% 11/01/2018 DD 11/01/03
SEC ID: 31403JUD6
FNMA POOL #0750445
5.000% 11/01/2018 DD 11/01/03
SEC ID: 31403JWE2
FNMA POOL #0751960
5.000% 12/01/2018 DD 11/01/03
SEC ID: 31403LMH1
FNMA POOL #0753425
5.000% 11/01/2018 DD 11/01/03
SEC ID: 31403NA23
FNMA POOL #0755165
5.000% 12/01/2018 DD 11/01/03
SEC ID: 31403Q6A3
FNMA POOL #0756372
5.000% 11/01/2018 DD 11/01/03
SEC ID: 31403SJR8
FORD MOTOR CR CO NT
6.750% 05/ 15/2005 DD 05/24/93
SEC ID: 345397GV9
GNMA POOL #0421389
6.500% 04/15/2026 DD 04/01/96
SEC ID: 36206UC23
GNMA POOL #0449851
6.500% 01/15/2028 DD 01/01/98
SEC ID: 36208FWLO
GNMA POOL #0466845
6.500% 06/ 15/2028 DD 06/01/98
SEC ID: 36209BTA6
GNMA POOL #0468052
6.500% 07 /15/2028 DD 07 /01/98
SEC ID: 36209C5M4
GNMA POOL #04 76041
6.500% 06/ 15/2028 DD 06/01/98
SEC ID: 36209MZE7
10/11/2004 10:41 :38AM PDT
101.8099
101.8099
101.8099
101.8099
101.7310
101.7539
101.8477
101.8477
102.4680
106.1328
105.5660
106.0391
106.0391
106.0391
Asset Detail
by Currency
9/30/2004
918,874.300
2,114,955.590
1,884,100.470
168,149.990
795,318.640
839,403.290
589,478.110
915,669.200
1,000,000.000
10,880.440
19,939.530
36,672.860
111,518.200
154,360.220
8
930,647.37
2,142,053.46
1,908,240.53
170,304.42
805,508.67
849,108.88
597,030.80
926,256.62
965,170.00
11,419.37
20,927.17
38,489.31
117,041.83
161,764.70
Report ID: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status:
935,505.06 0.21% 4,857.69
2,153,234.30 0.49% 11,180.84
1,918,200.92 0.44% 9,960.39
171,193.35 0.04% 888.93
809,085.57 0.19% 3,576.90
854,125.67 0.20% 5,016.79
600,369.66 0.14% 3,338.86
932,587.65 0.21% 6,331.03
1,024,680.00 0.24% 59,510.00
11,547.72 0.00% 128.35
21,049.37 0.00% 122.20
38,887.56 0.01% 398.25
118,252.85 0.03% 1,211.02
163,682.13 0.04% 1,917.43
Workbench
fb Mellon
OCSD-CONSOLIDATED-OCSGOOO 10000
GNMA POOL #0478626
6.500% 01/15/2029 DD 01/01/99
SEC ID: 36209QVT9
GNMA POOL #0480598
6.500% 10/15/2028 DD 10/01/98
SEC ID: 36209S3F6
GNMA POOL #0512235
6.500% 11/15/2029 DD 11/01/99
SEC ID: 36211GBC6
GNMA POOL #0514326
6.500% 07 /15/2029 DD 07 /01/99
SEC ID: 36211JLF2
GNMA II POOL #0080023
VAR RT 12/20/2026 DD 12/01/96
SEC ID: 36225CAZ9
GNMA II POOL #080088M
7.375% 06/20/2027 DD 06/01/97
SEC ID: 36225CC20
GNMA II POOL #0080395
VAR RT 04/20/2030 DD 04/01/00
SEC ID: 36225CNM4
GNMA II POOL #080408X
6.500% 05/20/2030 DD 05/01/00
SEC ID: 36225CN28
GNMA II POOL #0080900
VAR RT 05/20/2034 DD 05/01/04
SEC ID: 36225DAA2
GNMA II POOL #0080965
VAR RT 07 /20/2034 DD 07 /01/04
SEC ID: 36225DCB8
GENERAL ELEC CAP MTN #TR 00526
VAR RT 03/15/2005 DD 03/20/02
SEC ID: 36962GXX7
GENERAL MTRS ACCEP CORP SR NT
6.125% 08/28/2007 DD 08/29/02
SEC ID: 370425SD3
GOLDMAN SACHS GRP MTN
#TR00207
VAR RT 07 /23/2009 DD 07 /23/04
SEC ID: 38141EJQ3
GOLDMAN SACHS GROUP INC SR NT
4.125% 01/15/2008 DD 01/13/03
SEC ID: 38141GCS1
10/11/2004 10:41 :38AM PDT
106.0391
106.0391
105.9766
106.0391
101.9597
101.0384
100.9957
100.9951
99.3523
100.5420
100.0780
105.3590
100.1400
101.9210
Asset Detail
by Currency
9/30/2004
121,178.190
28,890.970
8,429.360
106,866.100
173,866.120
235,705.780
197 ,873.220
1, 781,830.040
379,619.490
1,394,813.520
2,500,000.000
3,000,000.000
800,000.000
3,000,000.000
9
126,990.96
30,276.82
8,846.87
111,992.33
176,745.77
240,861.85
196,080.00
1,763,733.32
369,357.89
1,393,941.75
2,502,460.00
3,064,350.00
800,000.00
3,030,030.00
Report m: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
128,496.21 0.03% 1,505.25
30,635.71 0.01% 358.89
8,933.15 0.00% 86.28
113,319.81 0.03% 1,327.48
177,273.37 0.04% 527.60
238,153.42 0.05% -2,708.43
199,843.48 0.05% 3,763.48
1,799,561.57 0.41% 35,828.25
377,160.50 0.09% 7,802.61
1,402,373.69 0.32% 8,431.94
2,501,950.00 0.57% -510.00
3,160,770.00 0.73% 96,420.00
801,120.00 0.18% 1,120.00
3,057 ,630.00 0.70% 27,600.00
Workbench
@> Mellon
OCSD-CONSOLlD4TED-OCSG00010000
GNMA GTD REMIC TR 2000-9 FH 100.7060
VAR RT 02/16/2030
SEC ID: 3837H4NX9
KRAFr FOODS INC NT 99.9840
VAR RT 11/26/2004 DD 11/26/02
SEC ID: 50075NAJ3
MORGAN STANLEY NT 100.0150
3.875% 01/15/2009 DD 01/13/04
SEC ID: 61746BALO
PACIFICORP SECD MTN #TR 00115 100.2500
7.300% 10/22/2004 DD 10/22/92
SEC ID: 69512EEU5
RESIDENTIAL ASSET 03-RSl 1 AIIB 99.8438
VAR RT 12/25/2033 DD 12/30/03
SEC ID: 760985K83
SBA GTD DEV PARTN 2001-20C 1 108.3450
6.340% 03/01/2021
SEC ID: 83162CWO
SBA GTD PARTN CTFS SBIC-PS 01 108.4200
6.640% 02/10/2011DD02/21/01
SEC ID: 831641DD4
UNITED AIRLS PASSTHRU 01-1 C 8.7120
6.831% 03/01/2010 DD 08/22/01
SEC ID: 909317BC2
U S TREASURY NOTES 108.0940
06.250% 02/15/2007 DD 02/15/97
SEC ID: 9128272JO
US TREASURY INFLATION INDEX NT 106.8750
3.375% 01/15/2007 DD 01/15/97
SEC ID: 9128272M3
US TREASURY INFLATION INDEX NT 109.6875
3.625% 01/15/2008 DD 01/15/98
SEC ID: 9128273T7
US TREASURY INFLATION INDEX NT 112.5940
3.875% 01/15/2009 DD 01/15/99
SEC ID: 9128274Y5
U S TREASURY NOTES 103.8905
05.750% 11/15/2005 DD 11/15/00
SEC ID: 9128276N7
U S TREASURY NOTES 100.6600
3.375% 12/15/2008 DD 12/ 15/03
SEC ID: 912828BT6
10/11/2004 10:41:38AM PDT
Asset Detail
by Currency
9/30/2004
541,639.630
3,000,000.000
3,200,000.000
3,000,000.000
779,923.690
2,985,923.500
1,920,261.520
1,600,000.000
20,000,000.000
16,760,940.000
3,522,270.000
15,035,670.000
3,900,000.000
17 ,600,000.000
10
541,639.63
2,999,910.00
3,149,248.00
2,950,530.00
779,923.69
2,985,923.50
1,920,261.52
1,600,000.00
22,620,312.50
14,842,998.33
3,831,771.35
16,661,030.11
4,288,149.14
17 ,405,000.00
Report m: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
545,463.61 0.13% 3,823.98
2, 999 ,520.00 0.69% -390.00
3,200,480.00 0.73% 51,232.00
3,007 ,500.00 0.69% 56,970.00
778,705.45 0.18% -1,218.24
3,235,098.82 0.74% 249,175.32
2,081,947.54 0.48% 161,686.02
139,392.00 0.03% -1,460,608.00
21,618,800.00 4.96% -1,001,512.50
17,913,254.63 4.11% 3,070,256.30
3,863.489.91 0.89% 31,718.56
16,929,262.28 3.88% 268,232.17
4,051,729.50 0.93% -236,419.64
17,716,160.00 4.06% 311,160.00
Workbench
8 Mellon
OCSD-CONSOUDATED-OCSGOOO 10000
U S TREASURY NOTES 99.4400
1.875% 01/31/2006 DD 01/31/04
SEC ID: 912828BX7
U S TREASURY NOTES 98.9844
1.625% 02/28/2006 DD 02/29/04
SEC ID: 912828CB4
U S TREASURY NOTES 99.7400
2.250% 04/30/2006 DD 04/30/04
SEC ID: 912828CF5
U S TREASURY NOTES 100.4400
2.750% 06/30/2006 DD 06/30/04
SEC ID: 912828CMO
US TREASURY NOTES 100.4100
2.750% 07 /31/2006 DD 07 /31/04
SEC ID: 912828CQ1
VIRGINIA ELEC & PWR 01 SER A 104.0310
5.750% 03/31/2006 DD 03/27 /01
SEC ID: 927804ENO
TOTAL FIXED INCOME SECURITIES
TOTAL ASSETS U.S. DOLLAR
TOTAL ASSETS -BASE:
10/11/2004 10:41 :38AM PDT
Asset Detail
by Currency
9/30/2004
61,000,000.000 60,967,721.21
17 ,000,000.000 17,045,156.25
33,000,000.000 32,835,000.00
27 ,500,000 .000 27 ,463,468.63
20,700,000.000 20, 708,556.41
1,750,000.000 1,743,840.00
365,290,996.630 370,006,438.81
469,623,959.100 434,144,294.31
469,623,959.100 434,144,294.31
11
Report m: GL8013
Base Currency: USD
Alternate Base Currency:
Exchange Rate:
Status: FINAL
60,658,400.00 13.92% -309,321.21
16,827 ,344.60 3.86% -217,811.65
32,914,200.00 7.55% 79,200.00
27 ,621,000.00 6.34% 157,531.37
20,784,870.00 4.77% 76,313.59
1,820,542.50 0.42% 76,702.50
371, 762, 124.34 85.29% 1, 755,685.53
435,899,979.84 100.00% 1, 755,685.53
435,899,979.84 100.00% 1, 755,685.53
Workbench
@ Mellon
OCSD-CONSOUDATED -OCSGOOO 10000
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
~i~~~~~~~:,~:·:.'.,~;:;1~~1~}~~\f ;~'c,.·;:.,j'~-11ro:·;i,
RECEIPTS AND DISBURSEMENT TRANSACTIONS
DISTRIBUTION TO PLAN ADMINISTRATOR
U.S. DOLLAR
:?:·Base
cw REPS DISTRIBUTION TO PLAN ADMINISTRATOR 9/15/2004 0.000 -40,000,000.00
SEC ID: NA9123459
OCSF07511102: LIQUID OPER-PIMCO 9/15/2004
PURCHASES
CASH & CASH EQUIVALENTS
U.S. DOLLAR
B FEDERAL HOME LN BKS CONS DISC MAT 9/21/2004 99.7164 8,400,000.000 8,376,181.33
11/ 19/2004 9/22/2004
SEC ID: 313384Q28 9/21/2004 BROKER: CITIGROUP GBL MKTS/SALOMON,
NEW YORK
OCSF07511102: LIQUID OPER-PIMCO
B FEDERAL HOME LN BK CONS DISC N MAT 9/1/2004 99.5508 5,000,000.000 4,977,541.67
12/08/2004 9/1/2004
SEC ID: 313384S59 9/1/2004 BROKER: BARCLAYS CAPITAL INC, NEW YORK
OCSF07511102: LIQUID OPER-PIMCO
8 FEDERAL HOME LN BK CONS DISC N MAT 9/8/2004 99.5576 3,600,000.000 3,584,075.00
12/08/2004 9/8/2004
SEC ID: 313384S59 9/8/2004 BROKER: GOLDMAN SACHS & CO, NY
OCSF07522202: LONG TERM OPER-PIMCO
B FEDERAL HOME LN MTG CORP DISC MAT 9/13/2004 99.5451 6,100,000.000 6,072,251.78
12/ 14/2004 9/13/2004
SEC ID: 313396T37 9/13/2004 BROKER: MORGAN STANLEY & CO INC, NY
OCSF07511102: LIQUID OPER-PIMCO
8 FEDERAL NATL MTG ASSN DISCOUNT MAT 9/29/2004 99.7663 700,000.000 698,364.14
11/ 15/2004 9/29/2004
SEC ID: 313588P66 9/29/2004 BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
1
Report ID: EWB009
Base Currency: USD
Status: FINAL
. ;~~: . ·. *~~·¥-1e,.·
. •"" ., ' ... ~. ' -.~ ..... -~ ....
-40,000,000.00 0.00
-8,376,181.33 0.00
-4,977 ,541.67 0.00
-3,584 ,075.00 0.00
-6,072,251.78 0.00
-698 ,364 .14 0.00
Workbench
fb Mellon
OCSD-CONSOLIDATEDm:rnooooooooooo
B FEDERAL NATL MTG ASSN DISCOUNT MAT
11/29/2004
SEC ID: 313588R49
BROKER: MORGAN STANLEY & CO INC, NY
OCSF07522202: LONG TERM OPER-PIMCO
B FEDERAL NATL MTG ASSN DISCOUNT MAT
12/01/2004
SEC ID: 313588R64
BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
B FEDERAL NATL MTG ASSN DISCOUNT MAT
12/01/2004
SEC ID: 313588R64
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
B FEDERAL NATL MTG ASSN DISCOUNT MAT
12/01/2004
SEC ID: 313588R64
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
B FEDERAL NATL MTG ASSN DISCOUNT MAT
12/08/2004
SEC ID: 313588855
BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
B FEDERAL NATL MTG ASSN DISC NTS MAT
12/ 15/2004
SEC ID: 313588T47
BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 l 0:43:55AM PDT
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/23/2004 99.6650 1, 100,000.000
9/23/2004
9/23/2004
9/1/2004 99.5703 6,000,000.000
9/1/2004
9/1/2004
9/3/2004 99.5748 400,000.000
9/3/2004
9/3/2004
9/7/2004 99.5927 3,600,000.000
9/7/2004
9/7/2004
9/8/2004 99.5551 200,000.000
9/8/2004
9/8/2004
9/20/2004 99.5676 400,000.000
9/20/2004
9/20/2004
2
1,096,315.00
5,974,216.67
398,299.11
3,585,337.50
199,110.22
398,270.44
Report ID: EWB009
Base Currency: USD
Status: FINAL
-1,096,315.00 0.00
-5,974,216.67 0.00
-398,299.11 0.00
-3,585,337.50 0.00
-199,110.22 0.00
-398,270.44 0.00
Workbench
•l
8 Mellon
OCSD-CONSOLIDATEDOIIl20:JOOOODDDOO
B FEDERAL NATL MTG ASSN DISCOUNT MAT
12/22/2004
SEC ID: 313588U37
BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
8 GENERAL ELEC CAP DISC 12 /02/2004
SEC ID: 36959HM20
BROKER: CITIBANK CP IPA, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
B US TREASURY BILL DUE 03/31/2005 DD
09/30/2004
SEC ID: 912795SG7
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202: LONG TERM OPER-PIMCO
B WELLS FARGO BANK NA INSTL C/D 1.650%
10/07 /2004 DD 09/09 /04
SEC ID: 9497P 1BU2
BROKER: WELLS FARGO BROKERAGE SVCS
LLC, MINNEAP
OCSF07511102: LIQUID OPER-PIMCO
B LEHMAN BROTHERS REPO 01.500%
09/02/2004 DD 09/01 /04
SEC ID: 99424 V960
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
B LEHMAN CAT 2REPO01.490% 09/ 03/2004 DD
09/02/04
SEC ID: 99424X628
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/22/2004 99.5324 3,600,000.000
9/22/2004
9/22/2004
9/1/2004 99.5604 200,000.000
9/1/2004
9/1/2004
9/30/2004 99.0246 16,000,000.000
10/1/2004
9/30/2004
9/7/2004 100.0000 1,100,000.000
9/9/2004
9/7/2004
9/1/2004 100.0000 19,100,000.000
9/1/2004
9/1/2004
9/2/2004 100.0000 19,100,000.000
9/2/2004
9/2/2004
8 CREDIT SUISSE FB REPO 01.470%09/07/2004 9/3/2004 100.0000 19,100,000.000
DD 09/03/04 9/3/2004
SEC ID: 99424Zl44 9/3/2004 BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
10/11/2004 10:43:55AM PDT
3
Report ID: EWB009
Base Currency: USD
Status: FINAL
3,583,165.00 -3,583,165.00 0.00
199,120.89 -199,120.89 0.00
15,843,937.78 -15,843,937.78 0.00
1,100,000.00 -1, 100,000.00 0.00
19,100,000.00 -19, 100,000.00 0.00
19,100,000.00 -19,100,000.00 0.00
19,100,000.00 -19,100,000.00 0.00
Workbench
~ Mellon
OCSD.CONSOLI DATE DDIIDr2 :I OD DD ODD DOD
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
B
B
B
B
B
B
LEHMAN BROTIIERS REPO 01.490%
09/08/2004 DD 09/07 /04
SEC ID: 99425A247
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
9/7/2004
9/7/2004
9/7/2004
CREDIT SUISSE FB REPO 01.500% 09 /08/2004 9 /7 /2004
DD 09/07/04 9/7 /2004
SEC ID: 99425A551
BROKER: CREDIT SUISSE FIRST BOSTON 9/7 /2004
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
LEHMAN CAT2 REPO 01.490%09/09/2004 DD 9/8/2004
~~c0~~:9425BB15 9 18 12004
BROKER: LEHMAN GOVT SECS INC, NY 9/8/2004
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.4900-4>09/10/2004 9/9/2004
DD 09/09/04 9/9/2004
SEC ID: 99425D258
BROKER: CREDIT SUISSE FIRST BOSTON 9/9/2 004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSEFB REPO 01.470%09/13/2004 9/10/2004
DD 09/10/04 9/10/2004
SEC ID: 99425E942
BROKER: CREDIT SUISSE FIRST BOSTON 9 / lO /2004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.4500-4>09/14/2004 9/13/2004
DD 09/13/04 9/13/2004
SEC ID: 99425F881
BROKER: CREDIT SUISSE FIRST BOSTON 9/ l3/2004
CORP, NY
OCSF0751 l 102: LIQUID OPER-PIMCO
10/11/2004 10:43:55AM PDT
100.0000 19,100,000.000
100.0000 3 ,800,000.000
100.0000 19,100,000.000
100.0000 20,200,000.000
100.0000 18,200,000.000
100.0000 20,000,000.000
4
Report m: EWB009
Base Currency: USD
Status: FINAL
19,100,000.00 -19,100,000.00 0.00
3,800,000.00 -3,800,000.00 0.00
19,100,000.00 -19,100,000.00 0.00
20,200,000.00 -20,200,000.00 0.00
18,200,000.00 -18,200,000.00 0.00
20,000,000.00 -20,000,000.00 0.00
Workbench
.-------------------------------------------------~------------------------------------~----------~--~--------------------------------------------------------------------------J~-------~' fb Mellon
OCSD-CONSOLIDATEDOllDl2 0 OD DO ODDO DD
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
B
B
B
B
B
B
B
B
B
LEHMAN CAT 2 REPO 01.450%09/ 15/2004 DD 9/14/2004
09/14/04 9/14/2004
SEC ID: 99425H622
BROKER: LEHMAN GOVT SECS INC, NY 9/14/2004
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.5000AI 09 /20/2004 9/17 /2004
DD 09/17 /04 9/ 17 /2004
SEC ID: 99425M613
BROKER: CREDIT SUISSE FIRST BOSTON 9/17 /2004
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/2/2004
9/2/2004
9/2/2004
9/2/2004
9/2/2004
9/2/2004
9/3/2004
9/3/2004
9/3/2004
9/8/2004
9/8/2004
9/8/2004
9/8/2004
9/8/2004
9/8/2004
10/11/2004 10:43:55AM PDT
100.0000 20, 100,000.000
100.0000 200,000.000
1.0000 295,652.470
1.0000 48,998.160
1.0000 2,621.340
1.0000 2,032.350
1.0000 19,100,790.530
1.0000 790.530
1.0000 16,973.110
5
Report ID: EWB009
Base Currency: USD
Status: FINAL
20,100,000.00 -20, 100,000.00 0.00
200,000.00 -200,000.00 0.00
295,652.47 -295,652.47 0.00
48,998.16 -48,998.16 0.00
2,621.34 -2,621.34 0.00
2,032.35 -2,032.35 0.00
19,100,790.53 -19,100,790.53 0.00
790.53 -790.53 0.00
16,973.11 -16,973.11 0.00
Workbench
fb Mellon
OCSD-CONSOLIDATEDc:m:l? DOD ODODDDOO
B DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
B DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
8 DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
8 DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
B DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
8 DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
8 DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
B DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/9/2004 1.0000 790.530
9/9/2004
9/9/2004
9/10/2004 1.0000 2,000 ,836.060
9/10/2004
9/10/2004
9/15/2004 1.0000 279,674.540
9/15/2004
9/15/2004
9/16/2004 1.0000 19,250.010
9/16/2004
9/16/2004
9/20/2004 1.0000 71,795.120
9/20/2004
9/20/2004
9/22/2004 1.0000 2,327.120
9/22/2004
9/22/2004
9/27/2004 1.0000 782,300.300
9/27/2004
9/27/2004
9/30/2004 1.0000 50,312.500
9/30/2004
9/30/2004
790.53
2,000,836.06
279,674.54
19,250.01
71,795.12
2,327.12
782,300.30
50,312.50
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR: 257,075,144.670 256,761,331.20
TOTAL CASH & CASH EQUIVALENTS BASE: 257,075,144.670 256,761,331.20
FIXED INCOME SECURITIES
10/11/2004 10:43:55AM PDT
6
Report ID: EWB009
Base Currency: USD
Status: FINAL
-790.53 0.00
-2,000,836.06 0.00
-279,674.54 0.00
-19,250.01 0.00
-71,795.12 0.00
-2,327.12 0.00
-782,300.30 0.00
-50,312.50 0.00
-256,761,331.20 0.00
-266, 761,331.20 0.00
Workbench
@ Mellon
OCS D-CO NS 0 LI DATE DJIJ!:n:2 J CJ 0 DD J 00000
U.S. DOLLAR
B COMMIT TO PUR FNMA SF MTG 5 .000%
10/01/2019 DD 10/01 /04
SEC ID: 01FOS04Al
BROKER: UBS SECURITIES LLC, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
B COMMIT TO PUR FNMA SF MTG 5 .500%
10/01/2033 DD 10/01/03
SEC ID: 01FOS26AS
BROKER: GOLDMAN SACHS & CO, NY
OCSF07522202: LONG TERM OPER-PIMCO
B COMMIT TO PUR FNMA SF MTG 5 .500%
10/01/2033 DD 10/01/03
SEC ID: 01F0526AS
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07522202: LONG TERM OPER-PIMCO
B KRAFT FOODS INC NT VAR RT 11/ 26/2004 DD
11/26/02
SEC ID: 50075NAJ3
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202: LONG TERM OPER-PIMCO
IB KRAFT FOODS INC NT VAR RT 11/26/2004DD
11/ 26/02
SEC ID: 50075NAJ3
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202: LONGTERM OPER-PIMCO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/14/2004 101.7344 22,000,000.000
10/19/2004
9/14/2004
9/10/2004 101.3750 3,000,000.000
10/14/2004
9/10/2004
9/17/2004 101.4609 1,000 ,000.000
10/14/2004
9/17/2004
9/23/2004 99.9970 3,000,000.000
9/28/2004
9/23/2004
9/23/2004 99.9970 0.000
9/28/2004
9/23/2004
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: 29,000,000.000
TOTAL FIXED INCOME SECURITIES BASE: 29,000,000.000
22,381,562.50
3,041,250.00
1,014,609.37
2,999,910.00
0.00
29,437,331.87
29,437 ,331.87
TOTAL PURCHASES BASE: 286,075,144.670 286,198,663.07
PAY UPS
10/11/2004 10:43:55AM PDT
7
Report ID: EWB009
Base Currency: USD
Status: FINAL
-22,381,562.50
-3,041,250.00
-1,014,609.37
-2,999,910.00
-5,390.00
-29,442,721.87
·29,442, 721.87
-286,204,053.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
o.oo
Workbench
fib Mellon
OCSD-CONSOLI DATEDDllIII2 D DD 00000000
FIXED INCOME SECURITIES
U.S. DOLLAR
PU FHLMC MULTICLASS MTG SER E3 A VAR RT
08/ 15/2032 DD 12/01/97
SEC ID: 3133TCE95
OCSF07522202: LONG TERM OPER-PIMCO
SALES
CASH & CASH EQUIVALENTS
U.S. DOLLAR
s
IS
s
IS
s
IS
FEDERAL HOME LN BKS CONS DISC
SEC ID: 313384K73
BROKER: CHASE SECURITIES, NEW YORK
OCSF07511102: LIQUID OPER-PIMCO
FEDERAL HOME LN BKS CONS DISC
SEC ID: 313384K73
BROKER: CHASE SECURITIES, NEW YORK
OCSF07511102: LIQUID OPER-PIMCO
FEDERAL HOME LN BK CONS DISC MAT
11/03/2004
SEC ID: 313384N21
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07511102: LIQUID OPER-PIMCO
FEDERAL HOME LN BK CONS DISC MAT
11/03/2004
SEC ID: 313384N21
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07511102: LIQUID OPER-PIMCO
FEDERAL HOME LN BK CONS DISC
SEC ID: 313384P37
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
FEDERAL HOME LN BK CONS DISC
SEC ID: 313384P37
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONGTERM OPER-PIMCO
10/ 11/2004 10:43:55AM PDT
9/1/2004
9/1/2004
9/1/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 2.300 2.30
9/15/2004
9/15/2004
9/15/2004
99.6326 -11,700,000.000 -11,657,014.75
9/15/2004
9/15/2004
9/15/2004
9/15/2004
9/15/2004
9/15/2004
9/15/2004
9/15/2004
9/15/2004
9/28/2004
9/28/2004
9/28/2004
9/28/2004
9/28/2004
9/28/2004
99.6326 0.000
99.6025 -3,000,000.000
99.6025 0.000
99.6006 -2,500,000.000
99.6006 0.000
8
0.00
-2,988,075.00
0.00
-2,490,015.28
0.00
Report ID: EWB009
Base Currency: USD
Status: FINAL
-2.30
11,657,014.75
26,800.25
2,988,075.00
5,077.25
2,490,015.28
4,609.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Workbench
@ Mellon
OCSD-CONSOLIDATED[][l![2 0 :JO OOOOOCJOO
s FEDERAL HOME LN MTG CORP DISC MAT
09/24/2004
SEC ID: 313396H22
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INCNY
OCSF07511102: LIQUID OPER-PIMCO
IS FEDERAL HOME LN MTG CORP DISC MAT
09/24/2004
SEC ID: 313396H22
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07511102: LIQUID OPER-PIMCO
s FEDERAL HOME LN MTG CORP DISC MAT
11/09/2004
SEC ID: 313396N82
BROKER: MORGAN STANLEY & CO INC, NY
OCSF07511102: LIQUID OPER-PIMCO
IS FEDERAL HOME LN MTG CORP DISC MAT
11/09/2004
SEC ID: 313396N82
BROKER: MORGAN STANLEY & CO INC, NY
OCSF07511102: LIQUID OPER-PIMCO
s FEDERAL NATL MTG ASSN DISC NT MAT
11/3/2004
SEC ID: 313588N27
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07511102: LIQUID OPER-PIMCO
IS FEDERAL NATL MTG ASSN DISC NT MAT
11/3/2004
SEC ID: 313588N27
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07511102: LIQUID OPER-PIMCO
10/11/2004 10:43:55AM PDT
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/15/2004 99.5730 -4 ,000 ,000.000
9/15/2004
9/15/2004
9/15/2004 99.5730 0.000
9/15/2004
9/15/2004
9/21/2004 99.6006 -2,800,000.000
9/22/2004
9/21/2004
9/21/2004 99.6006 0.000
9/22/2004
9/21/2004
9/15/2004 99.5975 -1,200,000.000
9/15/2004
9/15/2004
9/15/2004 99.5975 0.000
9/15/2004
9/15/2004
9
Report ID: EWB009
Base Currency: USD
Status: FINAL
-3,982,920.00 3,982,920.00 0.00
0.00 15,647.00 0.00
-2,788,817.11 2,788,817.11 0.00
0.00 4,761.56 0.00
-1,195,170.00 1,195,170.00 0.00
0.00 2,090.90 0.00
Workbench
fb Mellon
OCSD-CONSOLIDATEDODIJI:2 0 DD 00000000
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
s
IS
s
IS
s
IS
FEDERAL NATL MTG ASSN DISCOUNT MAT
11/ 10/2004
SEC ID: 313588N92
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
FEDERAL NATL MTG ASSN DISCOUNT MAT
11/ 10/2004
SEC ID: 313588N92
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
9/28/2004
9/28/2004
9/28/2004
9/28/2004
9/28/2004
9/28/2004
FEDERAL NATL MTG ASSN DISCOUNT MAT 9 /21 /2004
11/17/2004 9/22/2004
SEC ID: 313588P82
BROKER: BARCLAYS CAPITAL INC, NEW YORK 9/21/2004
OCSF07511102: LIQUID OPER-PIMCO
FEDERAL NATL MTG ASSN DISCOUNT MAT 9/21/2004
~~Cl~6~~~588P82 9/22/2004
BROKER: BARCLAYS CAPITAL INC, NEW YORK 9 /2 l/2 004
OCSF0751l102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.530%09/01/2004 9/1/2004
DD 08/31/04 9/1/2004
SEC ID: 994240731
BROKER: CREDIT SUISSE FIRST BOSTON 9 fl /2004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.530%09/01/2004 9/1/2004
DD 08/31/04 9/1/2004
SEC ID: 99424 U731
BROKER: CREDIT SUISSE FIRST BOSTON 9 /l/2 004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
99.5943 -500,000.000
99.5943 0.000
99.5918 -5,600,000.000
99.5918 0.000
100.0000 -5,300,000.000
100.0000 0.000
-497 ,971.46
0.00
-5,577,138.78
0.00
-5,300 ,000. 00
0.00
s LEHMAN CAT2 REPO 01.530%09/01/2004 DD 9/1/2004
08/31/04 9/1/2004
SEC ID: 99424 U822
100.0000 -12,500,000.000 -12,500,000.00
BROKER: LEHMAN GOvr SECS INC, NY 9I1 /2004
OCSF07511102: LIQUID OPER-PIMCO
10/11/2004 10:43:55AM PDT
10
Report m: EWB009
Base Currency: USD
Status: FINAL
497,971.46 0.00
1,007.29 0.00
5,577,138.78 0.00
7,791.00 0.00
5,300,000.00 0.00
225.25 0.00
12,500,000.00 0.00
Workbench
@ Mellon
OCSD-CONSOLIDATEDJ[]I][2DOOOOODDOOO
IS LEHMAN CAT2 REPO 01.530%09/01/2004 DD
08/31/04
SEC ID: 99424U822
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
9/1/2004
9/1/2004
9/1/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 0.000 0.00
s LEHMAN BROTHERS REPO 01.500% 9/2/2004 100.0000 -19,100,000.000 -19,100,000.00
09/02/2004 DD 09/01 /04 9/2/2004 SEC ID: 99424V960 9/2/2004 BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
IS LEHMAN BROTHERS REPO 01.500% 9/2/2004 100.0000 0.000 0.00
09/02/2004 DD 09/01/04 9/2/2004
SEC ID: 99424 V960 9/2/2004 BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
s LEHMAN CAT 2REPO01.490% 09/ 03/2004 DD 9/3/2004 100.0000 -19, 100,000.000 -19,100,000.00
09/02/04 9/3/2004
SEC ID: 99424X628 9/3/2004 BROKER: LEHMAN GOVT SECS INC, NY
OCSF0751 l 102: LIQUID OPER-PIMCO
IS LEHMAN CAT2 REPO 01.490%09/03/2004 DD 9/3/2004 100.0000 0.000 0.00
09/02/04 9/3/2004
SEC ID: 99424X628 9/3/2004 BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
s CREDIT SUISSE FB REPO 01.470% 09 /07 /2004 9/7 /2004 100.0000 -l 9, 100,000.000 -19,100,000.00
DD 09/03/04 9/7/2004
SEC ID: 99424Zl44 9/7/2004 BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF0751l102: LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 01.470% 09 /07 /2004 9/7 /2004 100.0000 0.000 0.00
DD 09/03/04 9/7/2004
SEC ID: 99424Zl44 9/7/2004 BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF0751 l 102: LIQUID OPER-PIMCO
10/11/2004 10:43:55AM PDT
11
Report m: EWB009
Base Currency: USD
Status: FINAL
531.25 0.00
19,100,000.00 0.00
795.83 0.00
19,100,000.00 0.00
790.53 0.00
19,100,000.00 0.00
3,119.67 0.00
Workbench
@ Mellon
OCSD-CONSOLIDATEDOIJ[][200000DOODOO
s LEHMAN BROTHERS REPO 01.490%
09/08/2004 DD 09/07 /04
SEC ID: 99425A247
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
IS LEHMAN BROTHERS REPO 01.490%
09/08/2004 DD 09/07 /04
SEC ID: 99425A247
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
9/8/2004
9/8/2004
9/8/2004
9/8/2004
9/8/2004
9/8/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 -19,100,000.000 -l 9, 100,000.00
100.0000 0.000 0.00
s CREDIT SUISSE FB REPO 01.5000-4> 09 /08/2004 9 /8/2004 100.0000 -3,800,000.000 -3,800,000.00
DD 09/07/04 9/8/2004 SEC ID: 99425A551 9/8/2004 BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
IS CREDIT SUISSE FB REPO 01.5000Ai 09 /08/2004 9 /8/2004 100.0000 0.000 0.00
DD 09/07/04 9/8/2004 SEC ID: 99425A551 9/8/2004 BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
s LEHMAN CAT 2 REPO 01.490% 09/09/2004 DD 9/9/2004 100.0000 -19,100,000.000 -19, 100,000.00
09/08/04 9/9/2004
SEC ID: 994258815 9/9/2004 BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 01.490% 09/09/2004 DD 9/9/2004 100.0000 0.000 0.00
09/08/04 9/9/2004
SEC ID: 994258815 9/9/2004 BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102: LIQUID OPER-PIMCO
s CREDIT SUISSE FB REPO 01.490%09/10/2004 9/10/2004 100.0000 -20,200,000.000 -20,200,000.00
DD 09/09/04 9/10/2004
SEC ID: 99425D258 9/10/2004 BROKER: CREDIT SUISSE FIRST BOSTON
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
10/ 11/2004 10:43:55AM PDT
12
Report ID: EWB009
Base Cmrency: USD
Status: FINAL
19, 100,000.00 0.00
790.53 0.00
3,800,000.00 0.00
158.33 0.00
19,100,000.00 0.00
790.53 0.00
20,200,000.00 0.00
Workbench
@ Mellon
OCSD-CONSOLIDATEDom:n::2'.:JOODOOOOOOO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
IS
s
IS
s
IS
s
CREDIT SUISSE FB REPO 01.4900/o09/10/2004 9/ 10/2004
DD 09/09/04 9/10/2004
SEC ID: 99425D258
BROKER: CREDIT SUISSE FIRST BOSTON 9/10 /2004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.470%09/13/2004 9/13/2004
DD 09/10/04 9/13/2004
SEC ID: 99425E942
BROKER: CREDIT SUISSE FIRST BOSTON 9 /13 /2004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.4700/o 09/13/2004 9/13/2004
DD 09/10/04 9/13/2004
SEC ID: 99425E942
BROKER: CREDIT SUISSE FIRST BOSTON 9 / l 3 /2004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.450%09/14/2004 9/14/2004
DD 09/13/04 9/14/2004
SEC ID: 99425F881
BROKER: CREDIT SUISSE FIRST BOSTON 9/14 /2004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.4500/009/14/2004 9/14/2004
DD 09/13/04 9/14/2004
SEC ID: 99425F881
BROKER: CREDIT SUISSE FIRST BOSTON 9 / l 4 /2004
CORP, NY
OCSF07511102: LIQUID OPER-PIMCO
LEHMAN CAT 2 REPO 01.450%09/ 15/2004 DD 9/15/2004
09/14/04 9/15/2004
SEC ID: 99425H622
BROKER: LEHMAN GOVT SECS INC, NY 9/15/2004
OCSF07511102: LIQUID OPER-PIMCO
10/11/2004 10:43:55AM PDT
100.0000 0.000 0.00
100.0000 -18,200,000.000 -18,200,000.00
100.0000 0.000 0.00
100.0000 -20,000,000.000 -20,000,000.00
100.0000 0.000 0.00
100.0000 -20,100,000.000 -20,100,000.00
13
Report ID: EWB009
Base Currency: USD
Status: FINAL
836.06 0.00
18,200,000.00 0.00
2,229.50 0.00
20,000,000.00 0.00
805.56 0.00
20' 100 ,000 .00 0.00
Workbench
fb Mellon
OCSD.CONSOLIDATEDOIJ!lI2DOOOOODDDOO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
Report ID: EWB009
Base Currency: USD
Status: FINAL
·i4~~ .. ~~J~~li~:~~~~{-~t·· i.:·?f 4~2/~ti;(J~;,;:_"(ii~~~·~i~~~~~~?'f ~!~X=;_r.;; .. ;:;:•· :~ f ~1~itifr~s~:f~~;I;,
IS
s
IS
s
s
s
s
s
LEHMAN CAT2 REPO 01.450%09/ 15/2004 DD 9/15/2004
09/14/04 9/15/2004
SEC ID: 99425H622
BROKER: LEHMAN GOVT SECS INC, NY 9/l5/2004
OCSF07511102: LIQUID OPER-PIMCO
CREDIT SUISSE FB REPO 01.500%09/20/2004 9/20/2004
DD 09I17 /04 9 /20 /2004
SEC ID: 99425M613
BROKER: CREDIT SUISSE FIRST BOSTON 9 /20 /2004
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
CREDIT SUISSE FB REPO 01.500%09/20/2004 9/20/2004
DD 09I17 /04 9 /20 /2004
SEC ID: 99425M613
BROKER: CREDIT SUISSE FIRST BOSTON 9/20/2004
CORP, NY
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
9/3/2004
9/3/2004
9/3/2004
9/7/2004
9/7/2004
9/7/2004
9/7/2004
9/7/2004
9/7/2004
9/13/2004
9/13/2004
9/13/2004
9/14/2004
9/14/2004
9/14/2004
10/ 11/2004 10:43:55AM PDT
100.0000 0.000 0.00 809.58 0.00
100.0000 -200,000.000 -200,000.00 200,000.00 0.00
100.0000 0.000 0.00 25.00 0.00
1.0000 -398,299.110 -398,299.11 398,299.11 0.00
1.0000 -19,096,880.330 -19,096,880.33 l 9 ,096,880.33 0.00
1.0000 -275,900.420 -275,900.42 275,900.42 0.00
1.0000 -1,970,022.280 -1,970,022.28 1,970,022.28 0.00
1.0000 -99,194.440 -99,194.44 99,194.44 0.00
Workbench
14
8 Mellon
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004 OCS D-CO NS 0 LIDA TE D[]]I])? 0 OD DD 000000
s
s
s
s
s
s
s
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
DREYFUS TREASURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
9/15/2004
9/15/2004
9/15/2004
9/17/2004
9/17/2004
9/17/2004
9/22/2004
9/22/2004
9/22/2004
9/23/2004
9/23/2004
9/23/2004
9/28/2004
9/28/2004
9/28/2004
9/29/2004
9/29/2004
9/29/2004
DREYFUS TREASURY CASH MGMT 9/30/2004
SEC ID: 996085247 9/30/2004
OCSF07511102: LIQUID OPER-PIMCO 9 /30/2004
1.0000 -15,885.550
1.0000 -200,000.000
1.0000 -61,691.840
1.0000 -100, 166.170
1.0000 -11,696.250
1.0000 -698,364.140
1.0000 -6,324.220
-15,885.55
-200,000.00
-61,691.84
-100,166.17
-11,696.25
-698,364.14
-6,324.22
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR: -250,034,424. 750 -249,911,547.13
TOTAL CASH & CASH EQUIVALENTS BASE:
FIXED INCOME SECURITIES
U.S. DOLLAR
10/11/2004 10:43:55AM PDT
-250,034,424. 750 -249,911,547.13
15
Report ID: EWB009
Base Currency: USD
Status: FINAL
15,885.55 0.00
200,000.00 0.00
61,691.84 0.00
100,166.17 0.00
11,696.25 0.00
698,364.14 0.00
6,324.22 0.00
249,991,239.72 0.00
249,991,239.72 0.00
Workbench
~ Mellon
OCSD-CONSOLIDATE DJDill::20 DD DD ODD ODD
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
Report m: EWB009
Base Currency: USD
Status: FINAL
I~~
· ... ,.~:, Desmptton -, .-. · ~ .. ,; \~ •·:~ ·td'"· ·•11'.l.'i;1f''$/:: "f,;;J:RiportettDate ,i:~,i·,;,, -.: .th Base f 1.t.;:1:.:.; · S es~'Par• t·i'"~l:;:frilffih-1:-;:··•;'/""'i'·Base::,; ··.t,•.~ ri···:. ·'·" -4'-::£-i't"t Baae;~~1;1r4·"fis,>:.-).~,.,,_.;<':.14. , • • 1 -'"., ~·i:·:"..!~'1-~-,:";::"•J'.-.. "~':'""".,. ,, , •i ~t-, •• ~,, ~ • ·"fi...,..~t~'1 , #.~· ~+~"'""""'-~·~.c-..,., ~ .. ! ... ·'.~1·~~ • ~·<'•::.. •"f" ,' \ '1.'··.1-... ~--I .o.;t•~ q .~ .. r~~~'·" <) •
s
s
s
IS
s
IS
s
COMMrr TO PUR FNMA SF MTG 5 .000%
09/01/2019 DD 09/01/04
SEC ID: 01F050494
BROKER: UBS SECURITIES LLC, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
COMMrr TO PUR FNMA SF MTG 5.5000/o
09/01/2034 DD 09/01/04
SEC ID: 01F052698
BROKER: GOLDMAN SACHS & CO, NY
OCSF07522202: LONG TERM OPER-PIMCO
9/14/2004
9/20/2004
9/14/2004
9/10/2004
9/15/2004
9/10/2004
GNMA POOL #0596612 6.5000/o 09/ 15/2032 9/ 17 /2004
DD 09/01/02 9/22/2004
SEC ID: 36200BYH4
BROKER: CHASE SECURITIES, NEW YORK 9 I17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0596612 6.5000/o09/15/2032 9/17/2004
DD 09/01/02 9/22/2004
SEC ID: 36200BYH4
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0569358 6.500% 04/15/2032 9/17/2004
DD 04/01/02 9/22/2004
SEC ID: 36200QQK3
BROKER: CHASE SECURITIES, NEW YORK 9 /l7 /2 004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL #0569358 6. 500% 04/15 /2032 9/17 /2004
DD 04/01/02 9/22/2004
SEC ID: 36200QQK3
BROKER: CHASE SECURITIES, NEW YORK 9I 17 /2 004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL #0569685 6.500% 02/15/2032 9/17 /2004
DD 02/01/02 9/22/2004
SEC ID: 36200Q2S2
BROKER: CHASE SECURITIES, NEW YORK 9 /1 7 /2 004
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
101.9766
101.6641
105.5469
105.5469
105.5469
105.5469
105.5469
16
-22,000,000.000 -22,268,125.00 22,434,843.75 166,718.75
-3,000 ,000.000 -3,026,250.00 3,049,921.87 23,671.87
-264,842.140 -277,960.09 279,532.63 1,572.54
0.000 0.00 1,004.19 0.00
-712,007.980 -728,695.66 751,502.16 22,806.50
0.000 0.00 2,699.70 0.00
-32,171.510 -33,765.01 33,956.02 191.01
Workbench
fb Mellon
OCSD-CONSOLIDATEDDl1!Il200DODOOOOOD
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
IS
s
IS
s
IS
s
IS
GNMA POOL #0569685 6. 5000/c> 02/ 15 /2032
DD 02/01/02
SEC ID: 36200Q2S2
BROKER: CHASE SECURITIES, NEW YORK
OCSF07S22202: LONG TERM OPER-PIMCO
9/17/2004
9/22/2004
9/17/2004
GNMA POOL#OS70019 6.SOOOA> 07/lS/2032 9/17 /2004
DD 07 /01/02 9/22/2004
SEC ID: 36200RG48
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2004
OCSF07S22202: LONG TERM OPER-PIMCO
GNMA POOL#OS70019 6.SOOOA> 07/15/2032 9/17 /2004
DD 07 /01/02 9/22/2004
SEC ID: 36200RG48
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2004
OCSF07S22202: LONG TERM OPER-PIMCO
GNMA POOL#05743236.SOOO/o12/lS/2031 9/17/2004
DD 12/01/01 9/22/2004
SEC ID: 36200WAY7
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#OS74323 6.SOOOA> 12/lS/2031
DD 12/01/01
SEC ID: 36200WAY7
BROKER: CHASE SECURITIES, NEW YORK
OCSF07S22202: LONG TERM OPER-PIMCO
9/17/2004
9/22/2004
9/17/2004
GNMA POOL #OS 7536 4 6. SOO% ll / lS / 2031 9 / 17 /2004
DD 11/01/01 9/22/2004
SEC ID: 36200XFD6
BROKER: CHASE SECURITIES, NEW YORK 9 /17 /2004
OCSF07S22202: LONG TERM OPER-PIMCO
GNMA POOL #OS 7S36 4 6. SOOOA> 11/lS/2031 9/17 /2004
DD 11/01/01 9/22/2004
SEC ID: 36200XFD6
BROKER: CHASE SECURITIES, NEW YORK 9 /17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
105.5469 0.000
105.5469 -56,220.260
105.5469 0.000
105.5469 -329,665.420
105.5469 0.000
105.5469 -26,482. 750
105.S469 0.000
17
Report m: EWB009
Base Currency: USD
Status: FINAL
0.00 121.98 0.00
-59,004.92 59,338.73 333.81
0.00 213.17 0.00
-345,994.16 347,951.57 1,957.41
0.00 1,249.98 0.00
-27,794.47 27,951.72 157.2S
0.00 100.41 0.00
Workbench
@ Mellon
OCSD.CONSOLIDATEDOI!ll20 OD 00000000
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
s
IS
s
IS
s
IS
s
GNMA POOL#0587117 6.500%06/15/2032 9/17/2004
DD 06/01/02 9/22/2004
SEC ID: 36201 MG22
BROKER: CHASE SECURITIES, NEW YORK 9/17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0587117 6.500%06/15/2032 9/17/2004
DD 06 /01/02 9/22/2004
SEC ID: 36201MG22
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#05874396.500%11/15/2032 9/17/2004
DD 12 /01/02 9/22/2004
SEC ID: 36201MS45
BROKER: CHASE SECURITIES, NEW YORK 9/ 17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#05874396.5000/c,11/15/2032 9/17/2004
DD 12/01/02 9/22/2004
SEC ID: 36201MS45
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2 004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL #0485527 6. 5000/c, 06/ 15 /2031 9 / l 7 /2004
DD 06/01/01 9/22/2004
SEC ID: 36209YLG 1
BROKER: CHASE SECURITIES, NEW YORK 9/17/2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0485527 6.5000A>06/15/2031 9/17/2004
DD 06/01/01 9/22/2004
SEC ID: 36209YLG1
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2 004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0485610 6.500%07/15/2031 9/17/2004
DD 07 /01/01 9/22/2004
SEC ID: 36209YN38
BROKER: CHASE SECURITIES, NEW YORK 9 I 17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
105.5470 -12,709.410
105.5470 0.000
105.5469 -41,805. 900
105.5469 0.000
105.5469 -308,742.090
105.5469 0.000
105.5469 -299,867.120
18
Report ID: EWB009
Base Currency: USD
Status: FINAL
-13,338.93 13,414.40 75.47
0.00 48.19 0.00
-43,876.60 44,124.82 248.22
0.00 158.51 0.00
-324,034.48 325,867.66 1,833.18
0.00 1,170.65 0.00
-314,719.92 316,500.37 1,780.45
Workbench
II
@ Mellon
OCSD-CONSOLIDATEDmmooooooooooo
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
IS
s
IS
s
IS
s
IS
GNMA POOL#0485610 6.500% 07/15/2031
DD 07 /01/01
SEC ID: 36209YN38
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
9/17/2004
9/22/2004
9/17/2004
GNMA POOL#0485682 6.500%08/15/2031 9/17/2004
DD 08/01/01 9/22/2004
SEC ID: 36209YRB6
BROKER: CHASE SECURITIES, NEW YORK 9/17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0485682 6.5000.4> 08/15/2031
DD 08/01/01
SEC ID: 36209YRB6
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONGTERM OPER-PIMCO
9/17/2004
9/22/2004
9/17/2004
GNMA POOL #0485703 6. 500% 08/ 15 /2031 9/17 /2004
DD 08/01/01 9/22/2004
SEC ID: 36209YRY6
BROKER: CHASE SECURITIES, NEW YORK 9 /l7/2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0485703 6.500%08/15/2031 9/17/2004
DD 08/01/01 9/22/2004
SEC ID: 36209YRY6
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0530053 6.5000Ai 04/15/2031
DD 04/01/01
SEC ID: 36212CZS3
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0530053 6.500%04/15/2031
DD 04/01/01
SEC ID: 36212CZS3
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
9/17/2004
9/22/2004
9/17/2004
9/17/2004
9/22/2004
9/17/2004
10/11/2004 10:43:55AM PDT
105.5469 0.000
105.5469 -62,698.030
105.5469 0.000
105.5469 -62,322.020
105.5469 0.000
105.5469 -29,982.560
105.5469 0.000
19
Report ID: EWB009
Base Currency: USD
Status: FINAL
0.00 1,137.00 0.00
-65,803.54 66,175.83 372.29
0.00 237.73 0.00
-65,408.90 65,778.94 370.04
0.00 236.30 0.00
-31,467.63 31,645.67 178.04
0.00 113.68 0.00
Workbench
q{b Mellon
OCSD-CONSOLIDATEDa.Jm20DDDDDDDOOO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
Report m: EWB009
Base Currency: USD
Status: FINAL
.tiQ~~~~:~0ti~~~~m~~~~Zi~
,, ftA · .Descrl"tlon·ir,1•···r1t•·;;;;}·'~'··l£i·i:i!>l·"'1 ·~·t•'l~· aeponeil,Diteo-J·.:.'-· ,_.,(.,;.,.·,8·Base ·:HH~ii·'-~S'l:.:!i':::.:::.w.s;'J. M~~ ~··'it:f•'<t;;.,.,,,,uJttmrt Ba e i·. ,_' .. ·,,' · .. 1· ·"' '--r..ifl~rBase:f~k'>/$,::fW·.;.¢:"r'i''\.> ~' .~i:,1:::Base-·· .. ir~ •r. r, ".. ~ < ,, Xz~~>-~ ... .,BT .. ~~;"'([f, ... ~-F'Gr''l .~':..t.;it!-"'° ~' ,\ .._,,,.'"' ~ ,. ~,:;~y...;! f Slr.: ~-' .. ' ;~~~· ~· ~a.a&:" 1; .. ~.. . r--:~· t ~v.Jtt:~fYl~~~.s~~~ ... 1~. •• • .~.. . f .. :.~ I • ) >{>'·~:) 1'>-:;.;_: ~~~;<.3:k~~~~t~~~~~~-P.. ~· .. z~,~; ':,..,)~.~· ~ l • ,,·~f
s
IS
s
IS
s
IS
s
GNMA POOL#0537885 6.500% 02/15/2031
DD 02/01/01
SEC 10: 36212MRE1
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
9/17/2004
9/22/2004
9/17/2004
GNMA POOL #0537885 6. 500% 02/ 15 /2031 9/17 /2004
DD 02/01/01 9/22/2004
SEC ID: 36212MRE1
BROKER: CHASE SECURITIES, NEW YORK 9I17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0547512 6.5000Ai04/15/2031 9/17/2004
DD 04/01/01 9/22/2004
SEC 10: 36212YGV9
BROKER: CHASE SECURITIES, NEW YORK 9/17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0547512 6.500%04/15/2031 9/17/2004
DD 04/01/01 9/22/2004
SEC 10: 36212YGV9
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL #0547715 6. SOOOk 02/ 15 /2031 9/17 /2004
DD 02/01/01 9/22/2004
SEC ID: 36212YN82
BROKER: CHASE SECURITIES, NEW YORK 9 /17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0547715 6.5000k 02/15/2031 9/17/2004
DD 02/01/01 9/22/2004
SEC ID: 36212YN82
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2 004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0552322 6.500%01/15/2032 9/17/2004
DD 01/01/02 9/22/2004
SEC ID: 36213ESK3
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2 004
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
105.5469
105.5469
105.5469
105.5469
105.5469
105.5469
105.5469
20
-81,590.690 -85,631.98 86,116.42 484.44
0.000 0.00 309.36 0.00
-8,135.060 -8,538.01 8,586.30 48.29
0.000 0.00 30.85 0.00
-72,460.530 -75,936.37 76,479.84 543.47
0.000 0.00 274.75 0.00
-51,007. 770 -53,534.25 53,837.11 302.86
Workbench
@ Mellon
OCSD-CONSOLIDATEDcm200000000000
Transaction Detail
Reported by Transaction Category
9/1/2004-9/30/2004
IS
s
IS
s
IS
s
IS
GNMA POOL#0552322 6.500% 01/15/2032
DD 01/01/02
SEC ID: 36213ESK3
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
9/17/2004
9/22/2004
9/17/2004
GNMA POOL#0552466 6.5000A>03/15/2032 9/17/2004
DD 03/01/02 9/22/2004
SEC ID: 36213EW36
BROKER: CHASE SECURITIES, NEW YORK 9/17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL #0552466 6. 500% 03/ 15 /2032 9/17 /2004
DD 03/01/02 9/22/2004
SEC ID: 36213EW36
BROKER: CHASE SECURITIES, NEW YORK 9/17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL #0552659 6. 500% 07/15 /2032 9/17 /2004
DD 07 /01/02 9/22/2004
SEC ID: 36213ESU6
BROKER: CHASE SECURITIES, NEW YORK 9/17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0552659 6.500% 07/15/2032 9/17 /2004
DD 07 /01/02 9 /22/2004
SEC ID: 36213E5U6
BROKER: CHASE SECURITIES, NEW YORK 9/17 /2004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#OS61017 6.500%07/15/2031 9/17/2004
DD 07 /01/01 9/22/2004
SEC ID: 36213QG29
BROKER: CHASE SECURITIES, NEW YORK 9 / l 7 /2 004
OCSF07522202: LONG TERM OPER-PIMCO
GNMA POOL#0561017 6.500%07/15/2031
DD 07 /01/01
SEC ID: 36213QG29
BROKER: CHASE SECURITIES, NEW YORK
OCSF07522202: LONG TERM OPER-PIMCO
9/17/2004
9/22/2004
9/17/2004
10/11/2004 10:43:55AM PDT
105.5469 0.000
105.5469 -332,908.930
105.5469 0.000
105.5469 -286,940.4 70
105.5469 0.000
105.5469 -251,903.290
105.5469 0.000
21
0.00
-349,398.32
0.00
-301,152.98
0.00
-264,380.37
0.00
Report m: EWB009
Base Currency: USD
Status: FINAL
193.40
351,374.97
1,262.28
302,856.70
1,087.98
265,876.06
955.13
0.00
1,976.65
0.00
1,703.72
0.00
1,495.69
0.00
Workbench
@ Mellon
OCSD-CONSOLIDATEDDIIl2 0 00 00000000
s GNMA POOL #0080867 VAR RT 04 /20/2034
DD 04/01/04
SEC ID: 36225C6D3
BROKER: GOLDMAN SACHS & CO, NY
OCSF07522202: LONG TERM OPER-PIMCO
IS GNMA POOL #0080867 VAR RT 04 /20/2034
DD 04/01/04
SEC ID: 36225C6D3
BROKER: GOLDMAN SACHS & CO, NY
OCSF07522202: LONG TERM OPER-PIMCO
9/8/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
99.5625 -998,687.140
9/23/2004
9/8/2004
9/8/2004 99.5625 0.000
9/23/2004
9/8/2004
-971,691.38
0.00
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: -29,323,151.070 -29,736,502.97
TOTAL FIXED INCOME SECURITIES BASE:
PRINCIPAL PAYMENTS
FIXED INCOME SECURITIES
U.S. DOLLAR
PD WMP/HUNTOON PAIGE #000-11150 7.500%
12/01/2030 DD 10/21 /99
SEC ID: 302998GE3
OCSF07522202: LONG TERM OPER-PIMCO
PDC FHLMC MULTICLASS MTG SER E3 A VAR RT
08/ 15/2032 DD 12/01 /97
SEC ID: 3133TCE95
OCSF07522202: LONG TERM OPER-PIMCO
PD FHLMC MULTICLASS MTG SER E3 A VAR RT
08/ 15/2032 DD 12/01 /97
SEC ID: 3133TCE95
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
TOTAL SALES BASE:
9/1/2004
9/1/2004
9/1/2004
8/1/2004
8/1/2004
9/1/2004
8/1/2004
8/1/2004
9/1/2004
-29,323, 151.070 -29,736,502.97
-279,357 ,575.820 -279,648,050.10
100.0000 -819.190 -801.40
100.0000 19,110.500 19,130.86
100.0000 -19,112.800 -19,133.16
22
Report m: EWB009
Base Currency: USD
Status: FINAL
994,317.90 22,626.52
1,830.93 0.00
30,002,387 .61 251,448.47
30,002,387.61 251,448.47
279,993,627.33 251,448.47
819.19 17.79
-19,110.50 20.36
19,112.80 -20.36
Workbench
@ Mellon
OCSD-CONSOLIDATEDCIIlll20 :JO 00000000
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
Report ID: EWB009
Base Currency: USD
Status: FINAL
·.tt~:~d: .: .. :,~-;::~,~.-:.·.:(: •· :~~;-• ~i-~~t:··~;:.-=;(:.::::t~··~,:.;:~1;~:1f ~;·;·;t~i·~:f ;;;:i?:,,;:it)~~t~.,:f j,fr~:t1~\.,;.\ :: ~-:• .. •· •••··· , .·. ~ · · ... , ~~~~~~~r~·;~f ~lrl1 :: .
.. Ty" .11;>,s~ptlon 1,. i,-. ,._·-·r;":i ·*·~" . ~·,·: . , ;i:"-;.: .. .. :Repo~eCI. ~t~'.9: .. ,.,, "1 · .. --.~ase,. . ..:::-··~·--:~ .• ~.~~·7~ ~<:"T.·"':~;. ·0 :~!:::.~"";. , ... Base , . ., . , . "~': . , . ~ .. ; .,~._~e: ,.i; t.:i>:;;;f';cn·\:•s'.i~!i#P!.~~~f5r
PD FHLMC MULTICLASS MTG SER E3 A VAR RT 9/1/2004 100.0000 -23,472.900 -23,497.91 23,472.90 -25.01
08/ 15/2032 DD 12/01 /97 9/1/2004 SEC ID: 3133TCE95 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FHLMC GROUP#78-6064 6.384% 01/01/2028 9/1/2004 100.0000 -2,548.610 -2,486.49 2,548.61 62.12
DD 12/01/97 9/1/2004 SEC ID: 31348SWZ3 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0254510 5.000% 11/01/2017 9/1/2004 100.0000 -11,180.520 -11,515.94 11,180.52 -335.42
DD 10/01/02 9/1/2004 SEC ID: 31371 KVB4 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0254631 5.000% 02/01/2018 9/1/2004 100.0000 -2,548.860 -2,625.33 2,548.86 -76.47
DD 01/01/03 9/1/2004
SEC ID: 31371KY47 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL#0254760 5.000%06/01/2018 9/1/2004 100.0000 -3,260.390 -3,358.20 3,260.39 -97.81
DD 05/01/03 9/1/2004
SEC ID: 31371 K5V9 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0254866 5.000% 09/01/2018 9/1/2004 100.0000 -877.530 -903.86 877.53 -26.33
DD 08/01/03 9/1/2004
SEC ID: 31371 LC83 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL#0254953 5.000% 11/01/2018 9/1/2004 100.0000 -5,509.260 -5,579.85 5,509.26 -70.59
DD 10/01/03 9/1/2004
SEC ID: 31371LE21 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0254987 5.000% 12/01/2018 9/1/2004 100.0000 -10,227.190 -10,358.23 10,227.19 -131.04
DD 11/01/03 9/1/2004
SEC ID: 31371LF46 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0323980 6.000% 04/01/2014 9/1/2004 100.0000 -4,164.990 -4,348.51 4,164.99 -183.52
DD 09/01/99 9/1/2004
SEC ID: 31374T2MO 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT Workbench
23
@ Mellon
OCSD-CONSOLIDATEDomn:2 O LID 00000000
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
Report ID: EWB009
Base Currency: USD
Status: FINAL
fb Mellon
OCSD.CONSOLIDATEDO!ll][20'.JDOOODDODO
PD FNMA POOL #0681309 5.000% 02 /01/2018
DD 02/01/03
SEC ID: 31391 Y3S4
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0681334 5.000% 02/01/2018
DD 01/01/03
SEC ID: 31391 Y4Tl
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA GTD REMIC P /T 02-76 PD 5.000%
08/ 25/2022 DD 10/01 /02
SEC ID: 31392FKF3
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0684908 5.000% 06/01/2018
DD 05/01/03
SEC ID: 31400D3Rl
OCSF07522202: LONGTERM OPER-PIMCO
PD FNMA POOL#0685200 5.000%03/01/2018
DD 03/01/03
SEC ID: 31400EGH7
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0685665 5.000% 02 /01/2018
DD 02/01/03
SEC ID: 31400EW22
OCSF07522202: LONGTERM OPER-PIMCO
PD FNMA POOL #0686318 5.000% 03/01/2018
DD 03/01/03
SEC ID: 31400FPB7
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0688739 5.000% 06/01/2018
DD 06/01/03
SEC ID: 31400JEL9
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0689859 5.000% 05 /0l/2018
DD 05/01/03
SEC ID: 31400KMG8
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43: SSAM PDT
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 -7,957.430
100.0000 -869.140
100.0000 -142,359.020
100.0000 -1,584.690
100.0000 -2,164.430
100.0000 -392.980
100.0000 -1,325.570
100.0000 -517.170
100.0000 -385.440
25
Report m: EWB009
Base Currency: USD
Status: FINAL
-8,196.15 7,957.43 -238.72
-895.21 869.14 -26.07
-145,206.20 142,359.02 -2,847.18
-1,604.99 1,584.69 -20.30
-2,192.16 2,164.43 -27.73
-404.77 392.98 -11.79
-1,365.34 1,325.57 -39.77
-532.69 517.17 -15.52
-390.38 385.44 -4.94
Workbench
~ Mellon
OCSD-CONSOLIDATEDomn?DOOOOODDCJOO
PD FNMA POOL #0693834 5.000% 03 /01/2018
DD 03/01/03
SEC ID: 31400PY74
OCSF07522202: LONGTERM OPER-PIMCO
PD FNMA POOL #0695852 5.000% 05/01/2018
DD 05/01/03
SEC ID: 31400SBVO
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0695889 5.000% 05/01/2018
DD 05/01/03
SEC ID: 31400SC23
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0697026 5.000%05/01/2018
DD 04/01/03
SEC ID: 31400TLF2
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0702210 5.000% 05 /0l /2018
DD 05/01/03
SEC ID: 31401ADP9
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL#0702328 5.000%05/01/2018
DD 04/01/03
SEC ID: 31401AHD2
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0709148 5.000% 06/01/2018
DD 06/01/03
SEC ID: 31401 HZM7
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0709360 5.000% 07/01/2018
DD 06/01/03
SEC ID: 31401JB56
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0709826 5.000% 06/01/2018
DD 06/01/03
SEC ID: 31401JSP4
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 -3,118.270
100.0000 -1,194.200
100.0000 -11,637.810
100.0000 -693.500
100.0000 -1,562.620
100.0000 -2,670.900
100.0000 -4,727.860
100.0000 -7,452.620
100.0000 -1,722.560
26
Report ID: EWB009
Base Currency: USD
Status: FINAL
-3,211.82 3,118.27 -93.55
-1,230.03 1,194.20 -35.83
-11,986.94 11,637.81 -349.13
-714.31 693.50 -20.81
-1,609.50 1,562.62 -46.88
-2,705.12 2,670.90 -34.22
-4,869.70 4,727.86 -141.84
-7,548.11 7,452.62 -95.49
-1,744.63 1,722.56 -22.07
Workbench
;, .,
@ Mellon
OCSD-CONSOLIDATEDDm200DODOOOODD
PD FNMA POOL #0709917 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401JVJ4
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0709963 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401JWYO
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0710235 5.000% 06/01/2018
DD 06/01/03
SEC ID: 31401KBC8
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0713344 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401NP52
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0713365 5.000%07 /01/2018
DD 07 /01/03
SEC ID: 31401NQS1
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL#0720319 5.000%07 /01/2018
DD 07 /01/03
SEC ID: 31401 WG45
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL#0720369 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401 WJNO
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0721629 5.000% 07/01/2018
DD 06/01/03
SEC ID: 31401XVW4
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0723487 5.000%06/01/2018
DD 06/01/03
SEC ID: 31402AXQ4
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 -2,620.340
100.0000 -2,225.210
100.0000 -2,672.000
100.0000 -70.820
100.0000 -5,569.010
100.0000 -6,186.360
100.0000 -46,360.120
100.0000 -1,344.360
100.0000 -962.420
27
ReportlD: EWB009
Base Currency: USD
Status: FINAL
-2,653.91 2,620.34 -33.57
-2,253.72 2,225.21 -28.51
-2,752.16 2,672.00 -80.16
-72.94 70.82 -2.12
-5,640.36 5,569.01 -71.35
-6,265.62 6,186.36 -79.26
-47,750.92 46,360.12 -1,390.80
-1,384.69 1,344.36 -40.33
-973.25 962.42 -10.83
Workbench
~ Mellon
OCSD-CONSOLIDATED[[[][J20 00 00000000
PD FNMA POOL #0729601 5.000% 07 /01/2018 9/1/2004
DD 07 /01/03 9/1/2004 SEC ID: 31402HRW3
9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL#0732873 5.000% 11/01/2018 9/1/2004
DD 10/01/03 9/1/2004 SEC ID: 31402MFN5
9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0737130 5.000% 10/01/2018 9/1/2004
DD 10/01/03 9/1/2004 SEC ID: 31402S4P9 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0738211 5.000% 10/01/2018 9/1/2004
DD 10/01/03 9/1/2004 SEC ID: 31402UDQ2 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0738487 5.000% 10/01/2018 9/1/2004
DD 10/01/03 9/1/2004 SEC ID: 31402UNC2 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0740471 5.000% 10/01/2018 9/1/2004
DD 10/01/03 9/1/2004 SEC ID: 31402WI'40 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0740748 5.000% 10/01/2018 9/1/2004
DD 11/01/03 9/1/2004
SEC ID: 31402W5H7 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0743868 5.000% 11/01/2018 9/1/2004
DD 10/01/03 9/1/2004
SEC ID: 31403BMR1 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0744008 5.000% 07 /01/2018 9/1/2004
DD 09/01/03 9/1/2004
SEC ID: 31403BR54 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 -6,915.960
100.0000 -134.470
100.0000 -3,748.290
100.0000 -2,305.540
100.0000 -5,826.530
100.0000 -2,873.420
100.0000 -3,948.030
100.0000 -887.450
100.0000 -17,073.110
28
-7,004.57
-136.19
-3,796.31
-2,335.08
-5,901.18
-2,910.24
-3,998.61
-898.82
-17,291.86
Report m: EWB009
Base Currency: USD
Status: FINAL
6,915.96 -88.61
134.47 -1.72
3,748.29 -48.02
2,305.54 -29.54
5,826.53 -74.65
2,873.42 -36.82
3,948.03 -50.58
887.45 -11.37
17,073.11 -218.75
Workbench
@ Mellon
OCS D-CO NS 0 LI DATE DDll!I2 GOD DDODDGDD
PD FNMA POOL #0744316 5.000% 09 /01/2018
DD 09/01/03
SEC ID: 31403B3Z4
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0747914 5.000% 11/01/2018
DD 11 /01/03
SEC ID: 31403F3XO
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0748400 5.000% 08/01/2018
DD 09/01/03
SEC ID: 31403GNR9
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0748899 5.000% 12/01/2018
DD 11/01/03
SEC ID: 31403G7LO
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0750377 5.000% 11 /01/2018
DD 11/01/03
SEC ID: 31403JUA2
OCSF07522202: LONGTERM OPER-PIMCO
PD FNMA POOL #0750380 5.000% 11/01/2018
DD 11 /01/03
SEC ID: 31403JUD6
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0750445 5.000% 11/01/2018
DD 11/01/03
SEC ID: 31403JWE2
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0751960 5.000% 12/01/2018
DD 11 /01/03
SEC ID: 31403LMH1
OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0753425 5.000% 11/01/2018
DD 11/01/03
SEC ID: 31403NA23
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/ 1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 -1,441.210
100.0000 -9,050.330
100.0000 -11,760.330
100.0000 -12,369.200
100.0000 -71,303.490
100.0000 -16,291.460
100.0000 -743.780
100.0000 -16,444.900
100.0000 -26,821.150
29
-1,459.68
-9,166.29
-11,911.01
-12,527.68
-72,217.07
-16,500.19
-753.31
-16,655.60
-27,131.27
Report ID: EWB009
Base Currency: USD
Status: FINAL
1,441.21 -18.47
9,050.33 -115.96
11,760.33 -150.68
12,369.20 -158.48
71,303.49 -913.58
16,291.46 -208.73
743.78 -9.53
16,444.90 -210.70
26,821.15 -310.12
Workbench
@ Mellon
OCSD-CONSOLIDATED'.JlllD? O OD 00000000
PD FNMA POOL #0755165 5.000% 12/01/2018 9/1/2004
DD 11/01/03 9/1/2004 SEC ID: 31403Q6A3 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD FNMA POOL #0756372 5.000% ll /01/2018 9/1/2004
DD 11/01/03 9/1/2004 SEC ID: 31403SJR8
9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL #0596612 6.5000k 09/15/2032 9/1/2004
DD 09/01/02 9/1/2004 SEC ID: 36200BYH4 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0569358 6.500% 04/15/2032 9/1/2004
DD 04/01/02 9/1/2004
SEC ID: 36200QQK3 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0569685 6.500% 02/15/2032 9/1/2004
DD 02/01/02 9/1/2004 SEC ID: 36200Q2S2 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL #05 70019 6. SOOOk 07/15 /2032 9/1/2004
DD 07 /01/02 9/1/2004 SEC ID: 36200RG48 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0574323 6.500% 12/15/2031 9/1/2004
DD 12/01/01 9/1/2004 SEC ID: 36200WAY7 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0575364 6.500% 11/15/2031 9/1/2004
DD 11/01/01 9/1/2004 SEC ID: 36200XFD6 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0587117 6.500%06/15/2032 9/1/2004
DD 06/01/02 9/1/2004
SEC ID: 36201MG22 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 -2,532.320
100.0000 -43,947.670
100.0000 -16,840.900
100.0000 -24,316.450
100.0000 -1,442.760
100.0000 -2,358.450
100.0000 -6,855.470
100.0000 -1,866.900
100.0000 -847.440
30
Report m: EWB009
Base Currency: USD
Status: FINAL
-2,564.77 2,532.32 -32.45
-44,455.81 43,947.67 -508.14
-17,675.05 16,840.90 -834.15
-24,886.37 24,316.45 -569.92
-1,514.22 1,442.76 -71.46
-2,475.27 2,358.45 -116.82
-7,195.03 6,855.47 -339.56
-1,959.37 1,866.90 -92.47
-889.41 847.44 -41.97
Workbench
~
~ Mellon
OCS D-CO NS OLI DATE Dcm2 ODD DODOO ODO
PD GNMA POOL #0587439 6.SOOOA> 11/ 15 /2032
DD 12/01/02
SEC ID: 36201MS45
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0421389 6.500% 04/15/2026
DD 04/01/96
SEC ID: 36206 UC23
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL #0449851 6.500% 01/ 15 /2028
DD 01/01/98
SEC ID: 36208FWLO
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0466845 6.500% 06/15/2028
DD 06/01/98
SEC ID: 36209BTA6
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0468052 6.500% 07/15/2028
DD 07 /01/98
SEC ID: 36209CSM4
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL #04 76041 6. 500% 06/ 15 /2028
DD 06/01/98
SEC ID: 36209MZE7
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0478626 6.5000/o 01/15/2029
DD 01/01/99
SEC ID: 36209QVI'9
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0480598 6.500% 10/15/2028
DD 10/01/98
SEC ID: 36209S3F6
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0485527 6.500% 06/15/2031
DD 06/01/01
SEC ID: 36209YLG 1
OCSF07522202: LONG TERM OPER-PIMCO
10/ 11/2004 10:43:55AM PDT
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
9/1/2004
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
100.0000 -1,536.910
100.0000 -259.730
100.0000 -32.790
100.0000 -50.440
100.0000 -423.280
100.0000 -245.220
100.0000 -175.260
100.0000 -38.340
100.0000 -27,815.660
31
-1,613.03
-272.60
-34.41
-52.94
-444.25
-256.98
-183.67
-40.18
-29,193.41
" Report ID: EWB009
Base Currency: USD
Status: FINAL
1,536.91 -76.12
259.73 -12.87
32.79 -1.62
50.44 -2.50
423.28 -20.97
245.22 -11.76
175.26 -8.41
38.34 -1.84
27,815.66 -1,377.75
Workbench
fb Mellon
OCSD-CONSOLIDATE Drnm 0 OD 00000000
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
Report m: EWB009
Base Currency: USD
Status: FINAL
;~~~~.~~;~~~~~~:.·:-~.~
PD GNMA POOL#0485610 6.500% 07/15/2031 9/1/2004
DD 07 /01/01 9/1/2004 SEC ID: 36209YN38
OCSF07522202: LONG TERM OPER-PIMCO 9/1/2004
100.0000 -383.730 -402.74 383.73 -19.01
PD GNMA POOL#0485682 6.500% 08/15/2031 9/1/2004
DD 08/01/01 9/ 1/2004 SEC ID: 36209YRB6
OCSF07522202: LONG TERM OPER-PIMCO 9/1/2004
100.0000 -2,211.360 -2,320.89 2,211.36 -109.53
PD GNMA POOL#0485703 6.500% 08/15/2031 9/1/2004 100.0000 -73.580 -77.22 73.58 -3.64
DD 08/01/01 9/1/2004 SEC ID: 36209YRY6
9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL #0512235 6. 5000/o 11/15 /2029 9/1/2004 100.0000 -13.060 -13.71 13.06 -0.65
DD 11/01/99 9/1/2004 SEC ID: 36211 OBC6
OCSF07522202: LONG TERM OPER-PIMCO 9/1/2004
PD GNMA POOL#0514326 6.5000/o 07/15/2029 9/1/2004 100.0000 -256.590 -268.90 256.59 -12.31
DD 07 /01/99 9/1/2004 SEC ID: 36211JLF2
9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0530053 6.5000/o04/15/2031 9/1/2004 100.0000 -1,096.620 -1,150.94 1,096.62 -54.32
DD 04/01/01 9/1/2004 SEC ID: 36212CZS3 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0537885 6.5000/o 02/15/2031 9/1/2004 100.0000 -10,782.680 -11,316.76 10,782.68 -534.08
DD 02/01/01 9/1/2004 SEC ID: 36212MRE1 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0547512 6.5000/o 04/15/2031 9/1/2004 100.0000 -21.290 -22.34 21.29 -1.05
DD 04/01/01 9/1/2004
SEC ID: 36212YGV9 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0547715 6.500% 02/15/2031 9/1/2004 100.0000 -83.390 -87.39 83.39 -4.00
DD 02/01/01 9/1/2004
SEC ID: 36212YN82 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT Workbench
32
~ Mellon
OCSD-CONSOLIDATEDDllDr2 O ::JO ODO DD ODO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
Report ID: EWB009
Base Currency: USD
Status: FINAL
~~~~~ ~~-:~·::~~" ~-~~:
PD GNMA POOL #0552322 6.500% 01/15/2032 9/1/2004 100.0000 -1,214.730 -1,274.90 1,214.73 -60.17
DD 01/01/02 9/1/2004 SEC ID: 36213ESK3 9/1/2004 OCSF07522202: LONGTERM OPER-PIMCO
PD GNMA POOL #0552466 6.5000-4> 03/15/2032 9/1/2004 100.0000 -13,801.740 -14,485.36 13,801.74 -683.62
DD 03/01/02 9/1/2004
SEC ID: 36213EW36 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL #0552659 6.SOOOA> 07/15/2032 9/1/2004 100.0000 -25,839.280 -27,119.13 25,839.28 -1,279.85
DD 07 /01/02 9/1/2004
SEC ID: 36213ESU6 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL#0561017 6.500% 07/15/2031 9/1/2004 100.0000 -564.430 -592.39 564.43 -27.96
DD 07 /01/01 9/1/2004
SEC ID: 36213QG29 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA II POOL#0080023VARRI'12/20/2026 9/1/2004 100.0000 -3,209.350 -3,262.50 3,209.35 -53.15
DD 12/01/96 9/1/2004
SEC ID: 36225CAZ9 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA II POOL#080088M 7.375%06/20/2027 9/1/2004 100.0000 -5,049.160 -5,159.61 5,049.16 -110.45
DD 06/01/97 9/1/2004
SEC ID: 36225CC20 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA II POOL #0080395 VAR RI' 04/20/2030 9/1/2004 100.0000 -9,193.680 -9,110.36 9,193.68 83.32
DD 04/01/00 9/1/2004
SEC ID: 36225CNM4 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA 11 POOL #080408X 6.500% 05/20/2030 9/1/2004 100.0000 -53,762.940 -53,216.91 53,762.94 546.03
DD 05/01/00 9/1/2004
SEC ID: 36225CN28 9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA POOL #0080867 VAR RI' 04 /20/2034 9/1/2004 100.0000 -11,133.540 -10,832.59 11,133.54 300.95
DD 04/01/04 9/1/2004
SEC ID: 36225C6D3 9/1/2004 OCSF07522202: LONGTERM OPER-PIMCO
10/11/2004 10:43:55AM PDT Workbench
33
@ Mellon
OCSD-CONSOLIDATEDornr20 ooooooocmo
PD GNMA II POOL #0080900 VAR RT 05/20/2034
DD 05/01/04
SEC ID: 36225DAA2
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA II POOL #0080965 VAR RT 07 /20/2034
DD 07 /01/04
SEC ID: 36225DCB8
OCSF07522202: LONG TERM OPER-PIMCO
PD GNMA OTO REMIC TR 2000-9 FH VAR RT
02/16/2030
SEC ID: 3837H4NX9
OCSF07522202: LONG TERM OPER-PIMCO
PD RESIDENTIAL ASSET 03-RSl 1 AIIB VAR RT
12/25/2033 DD 12/30/03
SEC ID: 760985K83
OCSF07522202: LONG TERM OPER-PIMCO
PD SBA GTD DEV PARTN 2001-20C 1 6.340%
03/01/2021
SEC ID: 83162CWO
OCSF07522202: LONG TERM OPER-PIMCO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/1/2004 100.0000 -1,260.940
9/1/2004
9/1/2004
9/1/2004 100.0000 -5,047.940
9/1/2004
9/1/2004
9/16/2004 100.0000 -18,270.170
9/16/2004
9/16/2004
9/25/2004 100.0000 -40,690.440
9/25/2004
9/25/2004
9/1/2004 100.0000 -274,962.580
9/1/2004
9/1/2004
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: -1,210,638.930
TOTAL FIXED INCOME SECURITIES BASE: -1,210,638.930
TOTAL PRINCIPAL PAYMENTS BASE: -1,210,638.930
MATURITIES
CASH & CASH EQUIVALENTS
U.S. DOLLAR
MT FEDERAL HOME LN BKS CONS DISC MAT 9/1/2004 100.0000 -6,300,000.000
09/01/2004 9/1/2004
SEC ID: 313384E39 9/1/2004 OCSF07511102: LIQUID OPER-PIMCO
10/11/2004 10:43:55AM PDT
34
-1,226.86
-5,044.79
-18,270.17
-40,690.44
-274,962.58
-1,227,318.28
-1,227,318.28
-1,227,318.28
-6,280,708.53
Report ID: EWB009
Base Currency: USD
Status: FINAL
1,260.94 34.08
5,047.94 3.15
18,270.17 0.00
40,690.44 0.00
274,962.58 0.00
1,210,638.93 -16,679.35
1,210,638. 93 -16,679.35
1,210,638.93 -16,679.35
6,280,708.53 0.00
Workbench
8 Mellon
OCS D-CONS 0 LI DATE Drnil!J2 0 OD 00000000
MT FEDERAL HOME LN MTG CORP DISC MAT
09/13/2004
SEC ID: 313396F73
OCSF07511102: LIQUID OPER-PIMCO
MT FEDERAL NATL MTG ASSN DISCOUNT MAT
09/01/2004
SEC ID: 313588E35
OCSF07511102: LIQUID OPER-PIMCO
MT US TREASURY BILL 0.000% 09/09 /2004 DD
03/ 11/04
SEC ID: 912795RB9
OCSF07511102: LIQUID OPER-PIMCO
MT WELLS FARGO BKNA INSTLC/D 1.450%
09/07 /2004 DD 08/05/04
SEC ID: 9497P04R9
OCSF07522202: LONG TERM OPER-PIMCO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/13/2004 100.0000 -5,900,000.000
9/13/2004
9/13/2004
9/1/2004 100.0000 -6,000,000.000
9/1/2004
9/1/2004
9/9/2004 100.0000 -2,200,000.000
9/9/2004
9/9/2004
9/7/2004 100.0000 -7,100,000.000
9/7/2004
9/7/2004
-5,873,384.44
-5,981,496.67
-2, 193,070.86
-7,100,000.00
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR: -27 ,500,000.000 -27 ,428,660.50
TOTAL CASH & CASH EQUIVALENTS BASE:
TOTAL MATURITIES BASE:
MISCELLANEOUS ACTIVITY
FIXED INCOME SECURITIES
U.S. DOLLAR
SW TO DELIVER OFF FRACTIONAL UNIT GNMA
POOL #0569358
SEC ID: 36200QQK3
OCSF07522202: LONG TERM OPER-PIMCO
SW TO DELIVER OFF FRACTIONAL UNIT GNMA
POOL #0575364
SEC ID: 36200XFD6
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
-27,500,000.000 -27 ,428,660.50
-27,500,000.000 -27,428,660.50
-0.040 -0.04
-0.020 -0.02
35
Report ID: EWB009
Base Currency: USD
Status: FINAL
5,873,384.44 0.00
5,981,496.67 0.00
2, 193,070.86 0.00
7,100,000.00 0.00
27 ,428,660.50 0.00
27,428,660.50 o.oo
27 ,428,660.50 0.00
0.00 -0.04
0.00 -0.02
Workbench
@ Mellon
OCSD.CONSOLIDATE DDmll20 :JD 00~00000
SW TO DELIVER OFF FRACTIONAL UNIT GNMA
POOL #0587439
SEC ID: 36201MS45
OCSF07522202: LONG TERM OPER-PIMCO
SW TO DELIVER OFF FRACTIONAL UNIT GNMA
POOL #0485610
SEC ID: 36209YN38
OCSF07522202: LONG TERM OPER-PIMCO
SW TO DELIVER OFF FRACTIONAL UNIT GNMA
POOL #0485703
SEC ID: 36209YRY6
OCSF07522202: LONG TERM OPER-PIMCO
SW TO DELIVER OFF FRACTIONAL UNIT GNMA
POOL #0552659
SW
SEC ID: 36213ESU6
OCSF07522202: LONG TERM OPER-PIMCO
TO DELIVER OFF FRACTIONAL UNIT GNMA
POOL #0561017
SEC ID: 36213QG29
OCSF07522202: LONG TERM OPER-PIMCO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
9/27/2004
-0.010
-0.020
-0.010
-0.010
-0.010
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: -0.120
TOTAL FIXED INCOME SECURITIES BASE:
TOTAL MISCELLANEOUS ACTIVITY BASE:
INTEREST
CASH & CASH EQUIVALENTS
U.S. DOLLAR
IT FEDERAL HOME LN BKS CONS DISC MAT
09/01/2004
SEC ID: 313384E39
OCSF07511102: LIQUID OPER-PIMCO
10/ 11/2004 10:43:55AM PDT
9/1/2004
9/1/2004
9/1/2004
-0.120
-0.120
6,300,000.000
36
Report m: EWB009
Base Currency: USD
Status: FINAL
-0.01 0.00 -0.01
-0.02 0.00 -0.02
-0.01 0.00 -0.01
-0.01 0.00 -0.01
-0.01 0.00 -0.01
-0.12 o.oo -0.12
-0.12 0.00 -0.12
-0.12 0.00 -0.12
19,291.47 19,291.47 0.00
Workbench
@ Mellon
OCSD-CONSOLIDATEDOIJDI2DOOOODODOOO
IT FEDERAL HOME LN MTG CORP DISC MAT
09/ 13/2004
SEC ID: 313396F73
OCSF07511102: LIQUID OPER-PIMCO
IT FEDERAL NATL MTG ASSN DISCOUNT MAT
09/01/2004
SEC ID: 313588E35
OCSF07511102: LIQUID OPER-PIMCO
IT US TREASURY BILL 0.000% 09/09 /2004 DD
03/ 11/04
SEC ID: 912795RB9
OCSF07511102: LIQUID OPER-PIMCO
IT WELLS FARGO BK NA INSTL C/D 1.450%
09/07/2004 DD 08/05/04
SEC ID: 9497P04R9
OCSF07522202: LONG TERM OPER-PIMCO
cw SHORT TERM FDS INT ADJ NET OF
OVERNIGHT INTEREST
SEC ID: 990000PJ4
OCSF07511102: LIQUID OPER-PIMCO
IT DREYFUS TREftSURY CASH MGMT
SEC ID: 996085247
OCSF07511102: LIQUID OPER-PIMCO
IT DREYFUS TREftSURY CASH MGMT
SEC ID: 996085247
OCSF07522202: LONG TERM OPER-PIMCO
IT BSDT-LATE MONEY DEPOSIT ACCT
SEC ID: 996087094
OCSF07522202: LONG TERM OPER-PIMCO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/13/2004 5,900,000.000
9/13/2004
9/13/2004
9/1/2004 6,000,000.000
9/1/2004
9/1/2004
9/9/2004 2,200,000.000
9/9/2004
9/9/2004
9/7/2004 7' 100,000.000
9/7/2004
9/7/2004
9/30/2004 0.000
9/30/2004
9/30/2004
9/2/2004 0.000
9/1/2004
9/2/2004
9/2/2004 0.000
9/1/2004
9/2/2004
9/1/2004 0.000
9/1/2004
9/1/2004
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR: 27,500,000.000
TOTAL CASH & CASH EQUIVALENTS BASE: 27 ,500,000.000
10/11/2004 10:43:55AM PDT
37
26,615.56
18,503.33
6,929.14
9,437.08
-6,324.22
1,825.51
2,032.35
0.08
78,310.30
78,310.30
Report ID: EWB009
Base Currency: USD
Status: FINAL
26,615.56
18,503.33
6,929.14
9,437.08
-6,324.22
1,825.51
2,032.35
0.08
78,310.30
78,310.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Workbench
@ Mellon
OCSD-CONSOLIDATEDOIJl1l:2 0 OD DODOO ODD
FIXED INCOME SECURITIES
U.S. DOLLAR
IT FHLMC MULTICLASS MTG SER E3 A VAR RT
08/ 15/2032 DD 12/01 /97
SEC ID: 3133TCE95
OCSF07522202: LONGTERM OPER-PIMCO
IT FHLMC MULTICLASS MTG SER E3 A VAR RT
08/ 15/2032 DD 12/01 /97
SEC ID: 3133TCE95
OCSF07522202: LONG TERM OPER-PIMCO
IT FHLMC GROUP#78-6064 6.384% 01/01/2028
DD 12/01/97
SEC ID: 31348SWZ3
OCSF07522202: LONG TERM OPER-PIMCO
IT FEDERAL NATL MTG ASSN DEBS 6.625%
09/ 15/2009 DD 09/01 /99
SEC ID: 31359MEY5
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL#0254510 5.000% 11/01/2017
DD 10/01/02
SEC ID: 31371 KVB4
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL#0254631 5.000%02/01/2018
DD 01/01/03
SEC ID: 31371 KY47
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0254760 5.000%06/01/2018
DD 05/01/03
SEC ID: 31371 K5V9
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0254866 5.000% 09/01/2018
DD 08/01/03
SEC ID: 31371 LC83
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/15/2004 19,112.800
8/1/2004
9/15/2004
9/15/2004 2.300
8/1/2004
9/15/2004
9/15/2004 871.900
8/1/2004
9/15/2004
9/15/2004 2,100,000.000
9/15/2004
9/15/2004
9/27/2004 11,180.520
9/1/2004
9/27/2004
9/27/2004 2,548.860
9/1/2004
9/27/2004
9/27/2004 3,260.390
9/1/2004
9/27/2004
9/27/2004 877.530
9/1/2004
9/27/2004
38
Report m: EWB009
Base Currency: USD
Status: FINAL
2,801.88 2,801.88 0.00
2.30 2.30 0.00
188.24 188.24 0.00
69,562.50 69,562.50 0.00
2,939.81 2,939.81 0.00
633.23 633.23 0.00
567.26 567.26 0.00
254.46 254.46 0.00
Workbench
~ Mellon
OCSD~ONSOLIDATED:::n:mr:2 D DD DD DOD ODD
IT FNMA POOL #0254953 5.000% 11 /01/2018
DD 10/01/03
SEC ID: 31371LE21
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0254987 5.000% 12/01/2018
DD 11/01/03
SEC ID: 31371 LF46
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0323980 6.000% 04 /01/2014
DD 09/01/99
SEC ID: 31374T2MO
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0357328 5.000% 01/01/2018
DD 01/01/03
SEC ID: 31376J4M8
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0357430 5.000% 09/01/2018
DD 09/01/03
SEC ID: 31376KA71
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL#0456482 6.000%02/01/2014
DD 02/01/99
SEC ID: 31381CCT2
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL#0509649 6.000%09/01/2014
DD 09/01/99
SEC ID: 31383QEWO
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0535451 6.000% 06/01/2015
DD 07 /01/00
SEC ID: 31384 VZQ8
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0555363 5.000% 04/01/2018
DD 03/01/03
SEC ID: 31385WSY 1
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/27/2004 5,509.260
9/1/2004
9/27/2004
9/27/2004 10,227.190
9/1/2004
9/27/2004
9/27/2004 4,164.990
9/1/2004
9/27/2004
9/27/2004 395.390
9/1/2004
9/27/2004
9/27/2004 26,499.220
9/1/2004
9/27/2004
9/27/2004 4,540.830
9/1/2004
9/27/2004
9/27/2004 1,009.210
9/1/2004
9/27/2004
9/27/2004 3,638.850
9/1/2004
9/27/2004
9/27/2004 5,564.200
9/1/2004
9/27/2004
39
Report m: EWB009
Base Currency: USD
Status: FINAL
1,349.13 1,349.13 0.00
3,646.35 3,646.35 0.00
802.44 802.44 0.00
107.29 107.29 0.00
5,667.51 5,667.51 0.00
248.19 248.19 0.00
634.01 634.01 0.00
629.11 629.11 0.00
1,350.28 1,350.28 0.00
Workbench
@ Mellon
OCS D~ONSOLI DATE DJ!IDl2 0 CJD DDODDODD
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
IT
IT
IT
IT
IT
IT
IT
IT
IT
FNMA POOL #0555453 5.000% 05/01/2018
DD 04/01/03
SEC ID: 31385XBW6
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0555545 5.000%06/01/2018
DD 05/01/03
SEC ID: 31385XES2
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL #0555621 5.000% 07/01/2018
DD 06/01/03
SEC ID: 31385XG68
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0681309 5.000%02/01/2018
DD 02/01/03
SEC ID: 31391 Y3S4
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0681334 5.000%02/01/2018
DD 01/01/03
SEC ID: 31391 Y4Tl
OCSF07522202: LONG TERM OPER-PIMCO
FNMA GTD REMIC P /T 02-76 PD 5.000%
08/25/2022 DD 10/01/02
SEC ID: 31392FKF3
OCSF07522202: LONG TERM OPER-PIMCO
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
FNMA POOL #0684908 5.000%06/01/2018 9/27 /2004
DD 05/01/03 9/ 1/2004
SEC ID: 31400D3Rl
OCSF07522202: LONG TERM OPER-PIMCO 9 /27 /2 004
FNMA POOL#0685200 5.000%03/01/2018 9/27/2004
DD 03/01/03 9/1/2004
SEC ID: 31400EGH7
OCSF07522202: LONGTERM OPER-PIMCO 9/27 /2004
FNMA POOL #0685665 5.000% 02/01/2018 9 /27 /2004
DD 02/01/03 9/1/2004
SEC ID: 31400EW22
OCSF07522202: LONG TERM OPER-PIMCO 9 /27 /2 004
10/11/2004 10:43:55AM PDT
464.490
4,965.240
18,155.050
7,957.430
869.140
142,359.020
1,584.690
2,164.430
392.980
40
Report m: EWB009
Base Currency: USD
Status: FINAL
139.52 139.52 0.00
1,120.13 1,120.13 0.00
3,886.42 3,886.42 0.00
2,084.24 2,084.24 0.00
253.37 253.37 0.00
3,590.83 3,590.83 0.00
1,318.48 1,318.48 0.00
745.76 745.76 0.00
129.06 129.06 0.00
Workbench
,, " I
@ Mellon
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004 OCSD-CONSOLIDATEDODI1!2 0 OD DD~OODDD
IT
IT
IT
IT
IT
IT
IT
IT
IT
FNMA POOL #0686318 5.000% 03/01/2018
DD 03/01/03
SEC ID: 31400FPB7
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0688739 5.000%06/01/2018
DD 06/01/03
SEC ID: 31400JEL9
OCSF07522202: LONG TERM OPER-PIMCO
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
FNMA POOL#0689859 5.000%05/01/2018 9/27/2004
DD 05/01/03 9/1/2004
SEC ID: 31400KMG8
OCSF07522202: LONGTERM OPER-PIMCO 9/27/2004
FNMA POOL#0693834 5.000%03/01/2018 9/27/2004
DD 03/01/03 9/1/2004
SEC ID: 31400PY74
OCSF07522202: LONG TERM OPER-PIMCO 9 /27 /2 004
FNMA POOL #0695852 5.000% 05 /01/2018
DD 05/01/03
SEC ID: 31400SBVO
OCSF07522202: LONG TERM OPER-PIMCO
9/27/2004
9/1/2004
9/27/2004
FNMA POOL#0695889 5.000%05/01/2018 9/27/2004
DD 05/01/03 9/1/2004
SEC ID: 31400SC23
OCSF07522202: LONG TERM OPER-PIMCO 9/27 /2004
FNMA POOL#0697026 5.000%05/01/2018 9/27/2004
DD 04/01/03 9/1/2004
SEC ID: 31400TLF2
OCSF07522202: LONG TERM OPER-PIMCO 9/27 /2004
FNMA POOL #0702210 5.000%05/01/2018
DD 05/01/03
SEC ID: 31401ADP9
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0702328 5.000%05/01/2018
DD 04/01/03
SEC ID: 31401AHD2
OCSF07522202: LONG TERM OPER-PIMCO
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
10/11/2004 10:43:55AM PDT
1,325.570
517.170
385.440
3,118.270
1,194.200
11,637.810
693.500
1,562.620
2,670.900
41
ReportID: EWB009
Base Currency: USD
Status: FINAL
1,098.94 1,098.94 0.00
437.03 437.03 0.00
353.85 353.85 0.00
2,491.38 2,491.38 0.00
888.92 888.92 0.00
2,980.75 2,980.75 0.00
94.94 94.94 0.00
882.75 882.75 0.00
552.54 552.54 0.00
Workbench
@ Mellon
OCSD-CONSOLIDATEDOIJD!2D DD DDDDDDOD
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
IT
IT
IT
IT
IT
IT
IT
IT
IT
FNMA POOL#0709148 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401HZM7
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL #0709360 5.000% 07/01/2018
DD 06/01/03
SEC ID: 31401JBS6
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0709826 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401JSP4
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0709917 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401JVJ4
OCSF07522202: LONG TERM OPER-PIMCO
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
FNMA POOL#0709963 5.000%06/01/2018 9/27/2004
DD 06/01/03 9/1/2004
SEC ID: 31401JWYO
OCSF07522202: LONG TERM OPER-PIMCO 9 /27 /2004
FNMA POOL #0710235 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401KBC8
OCSF07522202: LONG TERM OPER-PIMCO
9/27/2004
9/1/2004
9/27/2004
FNMA POOL #0713344 5.000% 06 /01/2018 9 /27 /2004
DD 06/01/03 9/1/2004
SEC ID: 31401NP52
OCSF07522202: LONG TERM OPER-PIMCO 9 /27 /2004
FNMA POOL#0713365 5.000%07 /0l/2018
DD 07 /01/03
SEC ID: 31401NQS1
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0720319 5.000%07/01/2018
DD 07 /01/03
SEC ID: 31401 WG45
OCSF07522202: LONG TERM OPER-PIMCO
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
10/ 11/2004 10:43:55AM PDT
4,727.860
7,452.620
1,722.560
2,620.340
2,225.210
2,672.000
70.820
5,569.010
6,186.360
42
1,122.54
2,615.53
439.35
924.36
85.11
2,439.53
66.52
1,091.27
2,982.21
Report m: EWB009
Base Currency: USD
Status: FINAL
1,122.54
2,615.53
439.35
924.36
85.11
2,439.53
66.52
1,091.27
2,982.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Workbench
•. I •'I
@ Mellon
OCSD.CONSOLIDATE Dcm:2 0 OD OOOODDDD
IT FNMA POOL#0720369 5.000%06/01/2018
DD 06/01/03
SEC ID: 31401WJNO
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0721629 5.000% 07 /01/2018
DD 06/01/03
SEC ID: 31401XVW4
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0723487 5.000%06/01/2018
DD 06/01/03
SEC ID: 31402AXQ4
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0729601 5.000% 07/01/2018
DD 07 /01/03
SEC ID: 31402HRW3
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0732873 5.000% 11 /01/2018
DD 10/01/03
SEC ID: 31402MFN5
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0737130 5.000% 10/01/2018
DD 10/01/03
SEC ID: 31402S4P9
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL#0738211 5.000% 10/01/2018
DD 10/01/03
SEC ID: 31402UDQ2
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0738487 5.000% 10/01/2018
DD 10/01/03
SEC ID: 31402UNC2
OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #07404 71 5.000% 10 /01/2018
DD 10/01/03
SEC ID: 31402Wf40
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/27/2004 46,360.120
9/1/2004
9/27/2004
9/27/2004 1,344.360
9/1/2004
9/27/2004
9/27/2004 962.420
9/1/2004
9/27/2004
9/27/2004 6,915.960
9/1/2004
9/27/2004
9/27/2004 134.470
9/1/2004
9/27/2004
9/27/2004 3,748.290
9/1/2004
9/27/2004
9/27/2004 2,305.540
9/1/2004
9/27/2004
9/27/2004 5,826.530
9/1/2004
9/27/2004
9/27/2004 2,873.420
9/1/2004
9/27/2004
43
• Report ID: EWB009
Base Currency: USD
Status: FINAL
8,772.05 8,772.05 0.00
1,198.26 1,198.26 0.00
975.85 975.85 0.00
1,658.76 1,658.76 0.00
139.50 139.50 0.00
2,716.78 2,716.78 0.00
2,166.81 2,166.81 0.00
802.75 802.75 0.00
2,819.25 2,819.25 0.00
Workbench
@ Mellon
OCS D-CO NS 0 LI DATE DO!llJ[R D DO DDDODDOD
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
Report ID: EWB009
Base Currency: USD
Status: FINAL
Tt~:. '..:-.{ .. /:,: ·•-t;:i1.~-::~~~Jf:f.~i;f /:l~~-i,i':;;;~~~~j(~--· ~~~:r1.,;~i{~;:.:::<·1::i~;~t~?1j~<~~r;r.i .~,;·• .· _-_. ·'/~b -~ ~i~'.· ;~~~i~,:~•l
....,.•Witl:>escnp' 'tlon .;1·h· "?.::t:.,·M~~;1;;~;'.";ifik~,. ~.1;!:;~1·~ Rip: ··drtea·:;Sit~·1~ ... ~ ,]~, ·BafliiJ.;1 ·:fr·11':slf~re~z· 2~'i;·f:)i '\~;;,2i111~fjf;T)if1~1t·it~:1Jiaie'tr.•1:.;:::~;::;::1J.t:t~~1·~L1 .::h:•:i··::..;,r,ia'~'·~.:.1: '· ;;·:::r ·1~· ~::"· ·;![9ft!"~~w~B'.llt~.w.:e··1~ J!!!t¥.~~~ ~. ~..... , ~:/,A')'"';~ ~--,0~,1 !'~w~!v~,;-a;d£'h;,..r';"!'~"-:-~~ r-~ ,, , ~---V.~~,. :.. ... At, • _,:~~E;~i;~!: ·' · .. ~-· ~~i!.:J.. ·~-w , ~ ~:, f, • 1 ~ H':., ;.~··~~~~~d ·.. · .... '""A "~ .~~ t~;;i ·~" .. -.:/\~~ '"1 {rtr;~~:!:tgmi ..... ~ ... '7~--'~-:~r/~~'--q1-{~L"J~~Jli -~et<t11
IT FNMA POOL #0740748 5.000% 10/01/2018 9/27/2004 3,948.030 3,122.62 3,122.62 0.00
DD 11/01/03 9/1/2004 SEC ID: 31402W5H7
9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0743868 5.000% 11 /01/2018 9/27/2004 887.450 159.99 159.99 0.00
DD 10/01/03 9/ 1/2004 SEC ID: 31403BMR1
9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0744008 5.000% 07 /0l /2018 9/27/2004 17,073.110 4,139.44 4,139.44 0.00
DD 09/01/03 9/1/2004 SEC ID: 31403BR54
9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0744316 5.000% 09 /01/2018 9/27/2004 1,441.210 645.77 645.77 0.00
DD 09/01/03 9/1/2004 SEC ID: 3140383Z4 9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0747914 5.000% 11 /01/2018 9/27/2004 9,050.330 1,455.09 1,455.09 0.00
DD 11/01/03 9/1/2004 SEC ID: 31403F3XO 9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0748400 5.000% 08/01/2018 9/27/2004 11,760.330 897.28 897.28 0.00
DD 09/01/03 9/1/2004 SEC ID: 31403GNR9 9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0748899 5.000% 12/01/2018 9/27/2004 12,369.200 3,880.18 3,880.18 0.00
DD 11/01/03 9/1/2004
SEC ID: 31403G7LO 9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0750377 5.000% 11/01/2018 9/27/2004 71,303.490 9,109.41 9,109.41 0.00
DD 11/01/03 9/1/2004 SEC ID: 31403JUA2 9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT FNMA POOL #0750380 5.000% 11 /01/2018 9/27/2004 16,291.460 7,918.30 7,918.30 0.00
DD 11/01/03 9/1/2004
SEC ID: 31403JUD6 9/27/2004 OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT Workbench
44 .,
@ Mellon
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004 OCSD-CONSOLIDATE OOOII[2 0 00 00000000
IT
IT
IT
IT
IT
IT
IT
IT
IT
FNMA POOL #0750445 5.000% 11 /01/2018
DD 11/01/03
SEC IO: 31403JWE2
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL#0751960 5.000% 12/01/2018
DD 11/01/03
SEC ID: 31403LMH1
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL #0753425 5.000% 11 /01/2018
DD 11/01/03
SEC IO: 31403NA23
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL #0755165 5.000% 12/01/2018
DD 11/01/03
SEC ID: 31403Q6A3
OCSF07522202: LONG TERM OPER-PIMCO
FNMA POOL #0756372 5.000% 11 /01/2018
DD 11/01/03
SEC ID: 31403SJR8
OCSF07522202: LONG TERM OPER-PIMCO
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
9/27/2004
9/1/2004
9/27/2004
GNMA POOL#0596612 6.500% 09/15/2032 9/15/2004
OD 09/01/02 9/1/2004
SEC ID: 36200BYH4
OCSF07522202: LONG TERM OPER-PIMCO 9 /15/2 004
GNMA POOL #0569358 6.500% 04/15/2032 9/15/2004
DD 04/01/02 9/1/2004
SEC ID: 36200QQK3
OCSF07522202: LONG TERM OPER-PIMCO 9 / 15/2 004
GNMA POOL#0569685 6.500% 02/15/2032 9/15/2004
DD 02/01/02 9/1/2004
SEC ID: 36200Q2S2
OCSF07522202: LONGTERM OPER-PIMCO 9 /l 5 /2 004
GNMA POOL#0570019 6.500% 07/15/2032 9/15/2004
DD 07 /01/02 9/ 1/2004
SEC ID: 36200RG48
OCSF07522202: LONG TERM OPER-PIMCO 9/ 15/2 004
10/11/2004 10:43:55AM PDT
743.780
16,444.900
26,821.150
2,532.320
43,947.670
16,840.900
24,316.450
1,442.760
2,358.450
45
G
Report m: EWB009 ''
Base Currency: USD
Status: FINAL
703.72 703.72 0.00
3,382.35 3,382.35 0.00
3,609.27 3,609.27 0.00
2,466.71 2,466.71 0.00
3,998.40 3,998.40 0.00
1,525.79 1,525.79 0.00
3,988.43 3,988.43 0.00
182.08 182.08 0.00
317.30 317.30 0.00
Workbench
fb Mellon
OCSD-CONSOLIDATEDCm2o OD 00000000
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
IT
IT
IT
IT
IT
IT
IT
IT
IT
GNMA POOL#0574323 6.500% 12/15/2031
DD 12/01/01
SEC ID: 36200WAY7
OCSF07522202: LONG TERM OPER-PIMCO
9/15/2004
9/1/2004
9/15/2004
GNMA POOL#0575364 6.500% 11/15/2031 9/15/2004
DD 11/01/01 9/1/2004
SEC ID: 36200XFD6
OCSF07522202: LONG TERM OPER-PIMCO 9 /15/2004
GNMA POOL #0587117 6.5000/o 06/15/2032 9/15/2004
DD 06/01/02 9/1/2004
SEC ID: 36201MG22
OCSF07522202: LONG TERM OPER-PIMCO 9 /l5/2004
GNMA POOL#0587439 6.5000/o 11/15/2032 9/15/2004
DD 12/01/02 9/1/2004
SEC ID: 36201 MS45
OCSF07522202: LONG TERM OPER-PIMCO 9 /l5/2004
GNMA POOL#0421389 6.500% 04/15/2026 9/15/2004
DD 04/01/96 9/1/2004
SEC ID: 36206 UC23
OCSF0752 2202: LONG TERM OPER-PIMCO 9 I l 5 /2004
GNMA POOL#0449851 6.5000/o 01/15/2028 9/15/2004
DD 01/01/98 9/1/2004
SEC ID: 36208FWLO
OCSF07522202: LONG TERM OPER-PIMCO 9 /15/2 004
GNMA POOL #0466845 6.500% 06/ 15/2028 9/ 15/2004
DD 06/01/98 9/1/2004
SEC ID: 36209BTA6
OCSF07522202: LONG TERM OPER-PIMCO 9/l5/2004
GNMA POOL#0468052 6.500%07/15/2028 9/15/2004
DD 07 /01/98 9/1/2004
SEC ID: 36209CSM4
OCSF07522202: LONG TERM OPER-PIMCO 9 /15/2 004
GNMA POOL#0476041 6.500% 06/15/2028 9/15/2004
DD 06/01/98 9/1/2004
SEC ID: 36209MZE7
OCSF07522202: LONG TERM OPER-PIMCO 9 /l5/2 004
10/11/2004 10:43:55AM PDT
6,855.470
1,866.900
847.440
1,536.910
259.730
32.790
50.440
423.280
245.220
46
Report ID: EWB009
Base Currency: USD
Status: FINAL
1,822.83 1,822.83 0.00
153.56 153.56 0.00
73.43 73.43 0.00
234.77 234.77 0.00
60.34 60.34 0.00
108.18 108.18 0.00
198.92 198.92 0.00
606.35 606.35 0.00
837.45 837.45 0.00
Workbench
0\ ti I
@ Mellon
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004 OCSD.CONSOLIDATEDDmll:2 0 DD DOODDDDD
IT
IT
IT
IT
IT
IT
IT
IT
IT
GNMA POOL#0478626 6.SOOOA> 01/15/2029 9/15/2004
DD 01/01/99 9/1/2004
SEC ID: 36209QVT9
OCSF07522202: LONGTERM OPER-PIMCO 9/15/2 004
GNMA POOL#0480598 6.5000Ai 10/15/2028 9/15/2004
DD 10/01/98 9/1/2004
SEC ID: 362098.1F6
OCSF07522202: LONGTERM OPER-PIMCO 9 /15/2 004
GNMA POOL#0485527 6.5000Ai06/15/2031 9/15/2004
DD 06/01/01 9/1/2004
SEC ID: 36209YLG 1
OCSF07522202: LONGTERM OPER-PIMCO 9 /l5/2004
GNMA POOL #0485610 6. SOOOAi 07/15 /2031
DD 07 /01/01
SEC ID: 36209YN38
OCSF07522202: LONG TERM OPER-PIMCO
9/15/2004
9/1/2004
9/15/2004
GNMA POOL#0485682 6.5000Ai 08/15/2031 9/15/2004
DD 08/01/01 9/1/2004
SEC ID: 36209YRB6
OCSF07522202: LONGTERM OPER-PIMCO 9/15/2004
GNMA POOL#0485703 6.SOOOAi 08/15/2031 9/15/2004
DD 08/01/01 9/1/2004
SEC ID: 36209YRY6
OCSF07522202: LONGTERM OPER-PIMCO 9/15/2004
GNMA POOL#0512235 6.5000Ai 11/15/2029 9/15/2004
DD 11/01/99 9/1/2004
SEC ID: 36211 GBC6
OCSF07522202: LONGTERM OPER-PIMCO 9/l5/2004
GNMA POOL#0514326 6.SOOOAi 07/15/2029 9/15/2004
DD 07 /01/99 9/ 1/2004
SEC ID: 36211JLF2
OCSF07522202: LONG TERM OPER-PIMCO 9/ l5/2 004
GNMA POOL #0530053 6.5000/o 04/ 15/2031 9/ 15/2004
DD 04/01/01 9/1/2004
SEC ID: 36212CZS3
OCSF07522202: LONG TERM OPER-PIMCO 9/15/2004
10/11/2004 10:43:55AM PDT
175.260
38.340
27,815.660
383.730
2,211.360
73.580
13.060
256.590
1,096.620
47
D J I Report ID: EWB009
Base Currency: USD
Status: FINAL
657.33 657.33 0.00
156.70 156.70 0.00
1,823.02 1,823.02 0.00
1,626.36 1,626.36 0.00
351.59 351.59 0.00
337.98 337.98 0.00
45.73 45.73 0.00
580.25 580.25 0.00
168.34 168.34 0.00
Workbench
@ Mellon
0 CS D-CO NS 0 LIDA TE D[]][][2 0 0 D DD D DD ODD
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
IT
IT
IT
IT
IT
IT
IT
IT
IT
GNMA POOL #0537885 6. 5000.lc:. 02/ 15 /2031
DD 02/01/01
SEC ID: 36212MRE1
OCSF07522202: LONG TERM OPER-PIMCO
9/15/2004
9/1/2004
9/15/2004
GNMA POOL#OS47512 6.5000k 04/15/2031 9/15/2004
DD 04/01/01 9/1/2004
SEC ID: 36212YGV9
OCSF07522202: LONG TERM OPER-PIMCO 9 I l5 /2 004
GNMA POOL#0547715 6.500% 02/15/2031 9/15/2004
DD 02/01/01 9/1/2004
SEC ID: 36212YN82
OCSF07522202: LONG TERM OPER-PIMCO 9 /15/2 004
GNMA POOL#0552322 6.500% 01/15/2032 9/15/2004
DD 01/01/02 9/1/2004
SEC ID: 36213ESK3
OCSF07522202: LONGTERM OPER-PIMCO 9 /l 5 /2004
GNMA POOL#0552466 6.5000/003/15/2032 9/15/2004
DD 03/01/02 9/1/2004
SEC ID: 36213EW36
OCSF07522202: LONG TERM OPER-PIMCO 9 / 15/2004
GNMA POOL#0552659 6.500% 07/15/2032 9/15/2004
DD 07 /01/02 9/1/2004
SEC ID: 36213E5U6
OCSF07522202: LONG TERM OPER-PIMCO 9 /15/2004
GNMA POOL#0561017 6.5000/o07/15/2031 9/15/2004
DD 07 /01/01 9/1/2004
SEC ID: 36213QG29
OCSF07522202: LONGTERM OPER-PIMCO 9 /15/2004
GNMA U POOL #0080023 VAR RT 12/20/2026
DD 12/01/96
SEC ID: 36225CAZ9
OCSF07522202: LONG TERM OPER-PIMCO
9/20/2004
9/1/2004
9/20/2004
GNMAil POOL#080088M 7.375%06/20/2027 9/20/2004
DD 06/01/97 9/1/2004
SEC ID: 36225CC20
OCSF07522202: LONG TERM OPER-PIMCO 9 /2 0/2004
10/11/2004 10:43:55AM PDT
10,782.680
21.290
83.390
1,214.730
13,801.740
25,839.280
564.430
3,209.350
5,049.160
48
500.36
44.18
392.95
282.87
1,878.02
1,694.23
1,367.53
682.48
677.12
Report m: EWB009
Base Currency: USD
Status: FINAL
500.36
44.18
392.95
282.87
1,878.02
1,694.23
1,367.53
682.48
677.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Workbench
'
... i. •• •I
fb Mellon
OCSD-CONSOLIDATEDO!l!I2DODDOCJDOODD
IT GNMA II POOL #0080395 VAR RT 04/20/ 2030
DD 04/01/00
SEC ID: 36225CNM4
OCSF07522202: LONG TERM OPER-PIMCO
IT GNMA II POOL #080408X 6.500% 05/20/2030
DD 05/01/00
SEC ID: 36225CN28
OCSF07522202: LONG TERM OPER-PIMCO
IT GNMA POOL#0080867VARRT 04/20/2034
DD 04/01/04
SEC ID: 36225C6D3
OCSF07522202: LONG TERM OPER-PIMCO
IT GNMA II POOL #0080900 VAR RT 05/20/ 2034
DD 05/01/04
SEC ID: 36225DM2
OCSF07522202: LONG TERM OPER-PIMCO
IT GNMA II POOL #0080965 VAR RT 07 /20/2034
DD 07 /01/04
SEC ID: 36225DCB8
OCSF07522202: LONG TERM OPER-PIMCO
IT GENERAL ELEC CAP MTN #TR 00526 VAR RT
03/ 15/2005 DD 03/20 /02
SEC ID: 36962GXX7
OCSF07511102: LIQUID OPER-PIMCO
IT GNMA GTD REMIC TR 2000-9 FH VAR RT
02/16/2030
SEC ID: 3837H4NX9
OCSF07522202: LONG TERM OPER-PIMCO
IT PACIFICORP SECD MTN #TR 00115 7.3000/o
10/22/2004 DD 10/22/92
SEC ID: 69512EEU5
OCSF07522202: LONG TERM OPER-PIMCO
IT RESIDENTIAL ASSET 03-RSl 1 AIIB VAR RT
12/ 25/2033 DD 12/30 /03
SEC ID: 760985K83
OCSF07522202: LONG TERM OPER-PIMCO
10/11/2004 10:43:55AM PDT
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
9/20/2004 9,193.680
9/1/2004
9/20/2004
9/20/2004 53,762.940
9/1/2004
9/20/2004
9/20/2004 11,133.540
9/1/2004
9/20/2004
9/20/2004 1,260.940
9/1/2004
9/20/2004
9/20/2004 5,047.940
9/1/2004
9/20/2004
9/15/2004 2,500,000.000
9/15/2004
9/15/2004
9/16/2004 18,270.170
9/16/2004
9/16/2004
9/1/2004 3,000,000.000
9/1/2004
9/1/2004
9/27/2004 40,690.440
9/25/2004
9/27/2004
49
Report ID: EWB009 i I
Base Currency: USD
Status: FINAL
582.38 582.38 0.00
5,162.60 5,162.60 0.00
2,524.55 2,524.55 0.00
952.20 952.20 0.00
4,082.93 4,082.93 0.00
10,509.72 10,509.72 0.00
979.84 979.84 0.00
109,500.00 109,500.00 0.00
1,460.21 1,460.21 0.00
Workbench
~ Mellon
OCSD-CONSOLIDATED~OODDDODDCJOO
Transaction Detail
Reported by Transaction Category
9/1/2004 -9/30/2004
IT SBA GTD DEV PARTN 2001-20C 1 6.34QOA, 9/1/2004 274,962.580
03/01/2021 9/1/2004 SEC ID: 83162CWO
9/1/2004 OCSF07522202: LONG TERM OPER-PIMCO
IT VIRGINIA ELEC & PWR 01 SER A 5.750% 9/30/2004 1,750,000.000
03/ 31/2006 DD 03/27 /01 9/30/2004 SEC ID: 927804ENO
9/30/2004 OCSF07522202: LONG TERM OPER-PIMCO
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: 10,553, 782. 930
TOTAL FIXED INCOME SECURITIES BASE: 10,553, 782.930
TOTAL INTEREST BASE: 38,053, 782.930
110,310.70
50,312.50
512,691.96
512,691.96
591,002.26
TOTAL TRANSACTIONS: 16,060, 715.030 -61,514,361.37
10/11/2004 10:43:55AM PDT
so
Report ID: EWB009
Base Currency: USD
Status: FINAL
110,310.70
50,312.50
512,691.96
512,691.96
591,002.26
0.00
0.00
0.00
0.00
0.00
-16,980, 126.35 234,769.00
Workbench
• #
FAHR COMMITTEE
AGENDA REPORT
Orange County Sanitation District
FROM: Lisa L. Tomko , Director of Human Resources
Originator: James Matte , Safety and Health Supervisor
Meeting Date
10/13/04
Item Number
FAH R04-87
SUBJECT: SAFETY POLICY, SAFETY-POL-402 , WORKERS ' COMPENSATION
BENEFITS AND LEAVE PROGRAM
GENERAL MANAGER'S RECOMMENDATION
To Bd . of Dir.
10/27/04
Item Number
14(c)
Approve SAFETY-POL-402 , Workers ' Compensation Benefits and Leave Program , as provided
for in Resolution No . OCSD 02 -5, regarding the District 's Injury and Illness Prevention Program
Policy .
SUMMARY
As required by State law, the District provides workers ' compensation benefits to
employees who are injured during the course of their employment. These benefits
include medical treatment, prescription medication , disability pay , if the injured
employee is unable to work during recovery, and if permanently d isabled by his/her
injuries, permanent disability pay. The District is currently self insured . The program is
managed by a third party administrator.
The District is implementing a written policy to adopt a program based on current
practice and Workers' Compensation reform passed by the California Legislature in
April 2004 , which becomes effective January 1 , 2005.
The document presented for your review and adoption represents the District's written
Workers' Compensation Benefits and Leave Policy.
PROJECT/CONTRACT COST SUMMARY
NIA
BUDGET IMPACT
D This item has been budgeted . (Lin e item : )
D This item has been budgeted , but there are insufficient funds .
D This item has not been budgeted .
[gJ Not applicable (information item)
ADDITIONAL INFORMATION
This policy formalizes practices currently in place regarding workers ' compensation .
ALTERNATIVES
NIA
CEQA FINDINGS
NIA
ATTACHMENTS
Attachment 1-Workers' Compensation Benefits and Leave Program (SAFETY-POL-402)
H \dep1\agendal80a'd Agenda Reports\2004 Board Agenda Reports\1004\ltem 14(c) Safety Pohcy 402 doc
Revised 8120/01 Page 2
i
1l
" '
ORANGE COUNTY SANITATION DISTRICT
Safety and Health Division
SAFETY-POL-402
Workers' Compensation
APPROVALS
Approved by: __________________ Date: __ _
Director of Human Resources
Approved by: __________________ Date: __ _
Manager, Human Resources
Approved by: __________________ Date: __ _
Safety and Health Supervisor
PROCEDURE REVISION HISTORY
Rev. Date Approval
0 10/27/04 L. Tomko
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and Health
public folder to ensure that they have the latest version.
Workers• Compensation Benefits Program SAFETY-POL-402
Contents
1. Purpose ................................................................................................. 3
2. Definitions ............................................................................................ 3
3. General-Workers' Compensation ....................................................... 3
4. Requirements ................••.....................................................•....•.......... 5
4.1 Safety and Health Division ....................................................................... 5
4.2 Purchasing Division ................................................................................. 5
4.3 Human Resources Department ............................................................... 5
4.4 Employee Development Division ............................................................. 5
4.5 Employees ............................................................................................... 5
4.6 Supervisors and Managers ...................................................................... 7
5. Program Administration and Evaluation ........................................... 7
6. References .....................•.............................................................•........ 7
7. Attachments ......................................•....•............................................. 8
2 of8
\
Number: SAFETY-POL-402 @ Orange County Sanitation District Revision Number: 0
Workers' Compensation Benefits Program Date: October 27, 2004
1. Purpose
2. Definitions
Employee
Self-insured
Employer
Third Party
Administrator
Workers'
Compensation
Review Board
Approved by: Lisa L. Tomko
The purpose of this policy is to establish guidelines for .
employees who suffer personal injury/illness arising out of or in
the course of employment with the Orange County Sanitation
District (District), thus requiring the affected employee(s) to
participate in the District's Workers' Compensation Program
(WCP).
An employee, or in the case of the employee's death, his or her
dependent, as each is defined in Division 4 of the Labor Code,
or the employee's or dependent's agent.
An employer, either as an individual employer or as a group of
employers, that has been issued a certificate of consent to self-
insure as provided by Labor Code Section 3700 (b) or (c),
including a joint powers authority or the State of California as a
legally uninsured employer.
An agent under contract to administer the workers'
compensation claims of an insurer, self-insured employer, or
joint powers authority.
The Review Board, commissioners, deputy commissioners,
presiding workers' compensation judges and workers'
compensation judges.
3. General-Workers' Compensation
1. The District shall implement a Workers' Compensation
Program (WCP), as a self-insured employer, under the
requirements of the applicable sections within California
Senate Bill 899 (2004). A Third-party Claims Administrator
(TPA) shall manage this program as applicable and under
the direction of the District.
3 of8
Workers' Compensation Benefits Program SAFETY-POL-402
2. Medical evaluation of WC claims shall be performed by a
Medical Network (MN) that will be established by the TPA
(January 2005). The MN shall be established and function
under the requirements of the California Labor Code,
Section 4616. Patient (employee) rights shall comply with
the requirements under California Labor Code, Section
4616.3
3. The District may authorize Sick-Industrial (SI) leave for
medical treatment directly related to an industrial
injury/illness when the TPA has accepted the claim for
benefits and authorized the treatment appointments.
4. Sick industrial leave may be authorized when the TPA has
delayed or denied a claim and the TPA has scheduled the
injured/ill employee for a medical appointment.
5. Sick industrial leave time periods in general will be utilized
for medical treatment procured using a pre-designated
physician, a referral from that pre-designated physician or
from a physician in the District's medical network. All other
physician visits shall utilize regular sick time.
6. Sick industrial leave time periods will be determined on a
case by case basis and must meet the procedures defined
below.
7. The leave is available to be used until the case is closed,
awarded or settled.
8. Sick industrial leave shall not be authorized for any
employee who has:
• Received a Findings and Award from the Workers'
Compensation Review Board;
• Engaged in a Stipulated Settlement;
• A claim which has been deemed closed by the TPA; or,
A Settlement which includes future medical expenses.
4 of8
j
Workers' Compensation Benefits Program SAFETY-POL-402
4. Requirements
4.1 Safety and Health Division
1. Manage the District's Workers' Compensation Program.
2. Develop a written WCP program/procedure document.
3. Act as the District's liaison with the TPA.
4. Conduct at least an annual review of the District's WCP.
5. Recommend action to the Director of Human Resources
regarding WC settlements issued by the TPA.
4.2 Purchasing Division
1. Act as the District liaison for all contract related issues with
the TPA.
4.3 Human Resources Department
1. Upon hire, notify employees of their right to designate a
physician for treatment related to an injury/illness under
Workers' Compensation.
2. Meet with appropriate employee groups to discuss issues
related to Workers' Compensation provisions.
4.4 Employee Development Division
1. Provide training, as appropriate, to staff related to the District's
Workers' Compensation policy/program.
2. Maintain employee training records for at least the duration of
the individual's employment with the District.
4.5 Employees
1. Immediately report any work related injury/illness to your
supervisor.
2. Complete the Workers' Compensation Claim Form and
submit it to the Safety and Health Division no later than one
business day following a reported WC incident.
5 of8
Workers' Compensation Benefits Program SAFETY-POL-402
A. Employees are not required to return to work the next
business day in the event of a medical emergency or if
they are incapacitated.
3. During the initial visit with the treating physician, inform
him/her of the District's Early Return to Work (ERTW)
(SAFETY-POL-404) program. Request that the physician
take this into account when determining the treatment
process and to contact the District's Safety and Health
Division for assistance.
4. Employees must request the time off in advance of all non-
emergency medical appointments.
A. Requests must provide the information about the
appointment including: schedule date and time and
treatment type, (i.e., doctor visit, physical therapy, etc.).
5. Employees shall submit medical certification of the
appointment satisfactory to the Safety and Health Division
which includes :
A. The date of injury;
B. Physician's name, signature, and telephone number;
C. Time in and time out for each appointment documented
on the appropriate form.
6. Appointments are to be scheduled at the beginning or end
of the employee's work shift whenever possible.
7. Appointments may be scheduled by the employee, the
Safety and Health Division or the TPA.
8. Employees shall report to work and work a minimum of five
hours on the day of the appointment.
9. A maximum of two and one half hours of SI leave including
transportation time and treatment time shall be authorized
per visit subject to approval.
A. A maximum per week of 7.5 hours is allowed.
10. Additional time taken off in excess of 7 .5 hours shall be
coded as sick or personal leave subject to approval,
provided that the minimum of five hours has been worked.
11. Leave with pay shall be coded on the time card as SI for
6 of8
,
Workers' Compensation Benefits Program SAFETY-POL-402
sick industrial.
12. No overtime may be claimed for appointments outside of
regular work hours.
13. Appointments outside of regular work hours are not
compensable.
4.6 Supervisors and Managers
1. Notify the Safety and Health Division on the date of injury or
illness.
2. Ensure the affected employee(s) files a WC claim form and
submit it to the Safety and Health Division no later than the
next business day following the reported incident.
A. Employees are not required to return to work the next
business day in the event of a medical emergency or if
they are incapacitated.
3. Contact the Safety and Health Division to determine the
status of a claim prior to approving leave.
4. Provide copies of the time off request and medical
certification to the Safety and Health Division within one day
of the medical appointment date.
5. Program Administration and Evaluation
6. References
1. The District's WCP shall be managed and administered
by the Safety and Health Division.
2. The Safety and Health Division shall at least annually
evaluate the District's WCP to ensure that it is in
compliance with state and federal laws and regulations.
California Senate Bill 899 and all referenced California Labor
Code Sections
SAFETY-POL-404, Early Return to Work Program
SAFETY-SOP-402 Workers' Compensation Program
7 ofB
-I
Workers' Compensation Benefits Program SAFETY-POL-402
Workers' Compensation Claim Form
7. Attachments
None
8of8
FAHR COMMITTEE
AGENDA REPORT
Orange County Sanitation Distri ct
FROM: Lisa L Tomko , Director of Human Resources
Originator: James Matte , Safety and Health Supervisor
Mee ting Date
10/13/04
Item Num ber
FAHR04-88
SUBJECT: SAFETY POLICY , SAFETY-POL-404, EARLY RETURN TO WORK
PROGRAM
GENERAL MANAGER'S RECOMMENDATION
Approve SAFETY-POL-404 , Early Return To Work Program , as provided for in
Resolution No. OCSD 02-5, regarding the District's Injury and Illness Prevention
Program Policy.
SUMMARY
To Bd . of Dir .
10/27/04
Item Numbe r
14(d}
The District is implementing a written policy to adopt a best management practice to
accommodate injured/ill employees and provide them with an opportun ity to return to
work prior to their full recovery . All job tasks will be approved in advance by the
injured/ill employee's treating physician to ensure that work is compatible wi t h any job
restrictions the employee may have. This policy applies to occupational and non-
occupational injuries and illnesses . It is anticipated this policy will save the District costs
associated with disability payments , overtime and/or temporary services.
The document presented for your review and adoption represents the District's written
Early Return to Work Policy.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
D This item has been budgeted . (Line item : )
D This item has been budgeted , but there are insufficient funds .
D This item has not been budgeted .
cgj Not applicable (information item)
ADDITIONAL INFORMATION
This policy formalizes practices currently in place to return injured employees to work
while still recovering from injuries and illnesses and complies with all current
Memorandums of Understanding (MOUs). The program requires that the employee 's
treating physician specify job restrictions to ensure the injured employee fully recovers
from his/her injury or illness. The Employee Services and/or Human Resources
Administration Division, Safety and Health Division and the employee 's manager will
determine if work is available to accommodate these job restrictions . The Safety and
Health Division will also maintain a list of available work in the event the employee's
manager cannot accommodate the work restrictions . If restrictions cannot be
accommodated , the employee is placed on disability until he/she is able to return to
work . The program allows for flexibility based on District business needs to allow for
accommodations on a case by case basis .
ALTERNATIVES
NIA
CEQA FINDINGS
NIA
ATTACHMENTS
Attachment 1-Early Return to Work Program (SAFETY-POL-404)
H ldepllagenda\Boa-d Agenda Repons\2004 Board Agenda Repons\1004\llem 14(d) Safely Polley 404 doc
Revised 8120/01 Page 2
...
Q
~
ORANGE COUNTY SANITATION DISTRICT
Safety and Health Division
SAFETY-POL-404
Early Return to Work Program
APPROVALS
Approved by: __________________ Date: __ _
Diredor of Human Resources
Approved by:. __________________ Date: __ _
Manager, Human Resources
Approved by: __________________ Date: __ _
Safety and Health Supervisor
PROCEDURE REVISION HISTORY
Rev. Date Approval
0 10/27/04 L. Tomko
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and Health
public folder to ensure that they have the latest version.
Early Return to Work Program SAFETY-POL-404
Contents
1. Purpose ..............................................................................................•.. 3
2. Definitions .............................................•.............................................. 3
3. General-Early Return to Work ............................................................. 4
4. Responsibilities ................................................................................... 5
4.1
4.2
4.3
4.4
4.5
Supervision/Management ........................................................................ 5
Safety and Health Division ....................................................................... 6
Employees ............................................................................................... 6
Employee Development Division ............................................................. 7
Human Resources Department ............................................................... 7
5. Permanent Restrictions ....................................................................... 8
6. Program Administration and Evaluation ........................................... 8
7. References ............................................................................................ 8
8. Attachments ......................................................................................... 8
2 of9
i
.-
-'
Number: SAFETY-POL-404 0 Orange County Sanitation District Revision Number: 0
Early Return to Work Program Date: October 27, 2004
1. Purpose
2. Definitions
Approved by: Lisa L. Tomko
The purpose of this policy is to establish a program to enhance
the recovery of Orange County Sanitation District (District)
employees who are injured or have developed an illness during
their tenure at the District. The program has been designed to
allow an employee to work, based on qualified medical
opinion(s), on a limited basis at his/her physical capacity until
such time that he/she is able to perform customary work duties
without restrictions.
Alternative Work Moving a worker(s) to another position within the District
Employee As defined in Division 4 of the California Labor Code.
Job Sharing Two or more employees share the hours and responsibilities of
one job position.
Modified Work Any changes to the original job that allow the injured/ill worker to
perform that work or in that position. This may include, but is not
limited to:
Part-time
Employee
•Changing work station or tools
•Eliminating tasks that the employee cannot perform
•Reducing the time spent on a specified job task(s)
Any employee who regularly works less than 80 hours in a
biweekly pay period (80 hours).
Transitional Work Assignments that meet the specific medical restrictions set by
the medical authority, while allowing the employee to perform
either some of the original job tasks or different job tasks that the
District has identified.
3 of9
Early Return to Work Program SAFETY-POL-404
3. General-Early Return to Work
1. Eligibility for participation in this program is for any District
employee on a medical leave or occupational injury/illness,
not permanently disabled, and is believed, by the authorized
physician, to be able to return to his/her regular job duties.
2. All modified work under this program will be assigned within
the employee's medical restrictions and on the date
approved by the authorized physician. An end date must be
included as part of a physician's request for modified duty to
be processed. All employee limitations/restrictions will be
lifted on the date specified unless a revised evaluation is
issued to the Safety and Health Division prior to the
expiration date. The employee will be required to return to
his/her regular job duties the next business day or may be
subject to disciplinary action.
3.
A. Employees are not required to return to work the next
business day in the event of a medical emergency or if
they are incapacitated.
Job modifications/accommodations will include the
following:
A. Part-time employment;
8. Deleting, adding and/or altering job tasks;
C. Job Sharing;
D. Job Restructuring;
E. Utilizing assistive devices;
F. Transitional work;
G. Alternate work;
H. Modified work.
4. The District will first attempt to assign a modified work
assignment within the employee's division. An assignment
in another division/department will be pursued should one
not be available within the employee's regularly assigned
division.
5. Participation in the program is mandatory when a modified
4of9
,-•
o.
Early Return to Work Program SAFETY-POL-404
work assignment is made available to the employee.
6. A specific time period shall be established for each modified
job assignment and will be based on the authorized
physician's estimated time for full recovery, but shall not
exceed more than 90 working days.
A. If the individual's modified job assignment exceeds the
90 working day period, Permanent Restrictions shall be
reviewed in accordance with section 5.0 of this
document.
7. The injured/ill employee must provide a written medical
release or continuance of condition to the Safety and Health
Division on the next business day following each medical
evaluation.
A. Employees are not required to return to work the next
business day in the event of a medical emergency or if
they are incapacitated.
4. Responsibilities
4.1 Supervision/Management
1. Notify the Safety and Health Division on the date of injury or
illness.
2. Inform the employee on the provisions of the Early Return to
Work Program.
3. Work with the injured/ill employee to complete the
appropriate forms.
4. Work with the Safety and Health Division to ensure accurate
information is provided to and from the medical authority.
5. Work with the Safety and Health Division in developing a
written accommodation(s)/modified work assignment for the
injured/ill employee.
6. Meet with the employee the first reporting day for a modified
work assignment to ensure the parties have a complete and
full understanding of the modified work assignment.
7. Maintain frequent communication with the employee on the
5of9
Early Return to Work Program SAFETY-POL-404
progress of the assignment and determine if additional
resources and/or training are required.
8. Notify the Safety and Health Division prior to initiating any
change to the assignment or if any problems arise.
4.2 Safety and Health Division
4.3 Employees
1. Administer and monitor the Early Return to Work Program.
2. Facilitate the processing of claims and forms and initiate
benefits as appropriate.
3. Develop, with the supervisor/manager, a written description
of the accommodation(s)/modified work assignment for each
case.
4. Develop, where appropriate, modified work assignments in
other areas of the organization.
5. Maintain confidentiality of any and all medical records.
6. Perform appropriate record keeping.
7. Assist the Employee Development Division with providing
any necessary training to ensure that an affected
employee(s) can safely perform the modified job
assignment.
8. Conduct at least an annual review of the District's Early
Return to Work Program.
1. Immediately report any work related or non work related
injury/illness to your supervisor that may affect job
performance.
2. Complete all appropriate forms and submit to the supervisor
and the Safety and Health Division.
3. Discuss the possibility of participating in the Early Return to
Work Program with your supervisor/manager.
4. Maintain at least weekly updates to the Safety and Health
Division on medical status and treatments.
5. Provide input to your supervisor/manager on a modified
6of9
••
Early Return to Work Program SAFETY-POL-404
work assignment that would cause the least impact on
workflow and meet the medical restrictions set by the
medical authority.
6. Return to work when a modified work assignment has been
established and medical clearance has been granted
(including an end date for the medical restriction/limitation).
Refusal to report will result in disciplinary action.
4.4 Employee Development Division
1. Provide training, as appropriate, to accommodate an
employee participating in the Earty Return to Work Program.
A. Affected party manager shall request training.
2. Provide documentation of training to the employee's
supervisor, when requested.
3. Maintain training records for all individuals participating in
the Early Return to Work Program for at least the duration of
the individual's employment with the District.
4.5 Human Resources Department
1. Meet with appropriate employee groups to discuss issues
related to Workers' Compensation provisions.
2. Organize meetings with the affected employee to discuss
reasonable accommodation. Attendee's may include
representatives from the following Divisions or
organizations:
A. Affected Employee's Union Representative
B. Human Resources Department
C. Safety and Health Division
D. Affected Employee's Division Management
E. A representative from the District's Third Party
Administrator, as needed.
7 of9
Early Return to Work Program SAFETY-POL-404
5. Permanent Restrictions
If after the ninety-day (90) Early Return to Work accommodation,
the employee is unable to return to full/unrestricted duty, the
supervisor will work with the Safety and Health Division, the
employee and the medical authority to determine if a time
extension if appropriate. If approved, a written confirmation
detailing the length of the time extension, and any job
assignment modifications, will be issued by the Safety and
Health Division to the employee and supervisor within five (5)
business days.
If the time extension is not granted, the employee will be advised
of his/her right to apply for a permanent accommodation under
the provisions of the American with Disabilities Act. The Safety
and Health Division will provide assistance to the employee
during this process. During the transition period, the employee
will continue to work under conditions of the existing modified
work assignment unless the medical authority does not approve.
At which time, a revised modified assignment will be completed
in a manner consistent with the original.
6. Program Administration and Evaluation
7. References
1. The Early return to Work Program shall be administered
and managed by the Safety and Health Division.
2. The Early Return to Work Program shall be evaluated
annually to ensure that it is in compliance with state and
federal laws and regulations.
Safety Policy 402: Workers Compensation
Americans with Disabilities Act of 1990
8. Attachments
None
8 of9
6J06
t0t-10d-A.L3:1YS ...
•
FAHR COMMITI'EE
AGENDA REPORT
Orange County Sanitation District
FROM: Gary G . Streed , Director of Finance
Originator: Michael D. White , Controller
Meeting Date
10/13/04
Item Number
FAHR04-89
To Bd . o f Dir .
10/27/04
Item Number
14(e)
SUBJECT: TRANSFER OF COLLECTION AGENT RESPONSIBILITIES FROM THE
CITY OF WESTMINSTER TO MIDWAY CITY SANITARY DISTRICT FOR
ALL CAPITAL FACILITIES CAPACITY CHARGES DUE WITHIN THE
CITY LIMITS OF THE CITY OF WESTMINSTER
GENERAL MANAGER'S RECOMMENDATION
(1) Approve the Agreement to Terminate Collection of Sewer Connection Charges
with the City of Westminster for the collection of capital facilities capacity charges , in a
form approved by General Counsel ; and ,
(2) Approve the Agreement for Collection of Capital Facilities Capacity Charges with
the Midway City Sanitary District, in a form approved by General Counsel.
SUMMARY
In 1973, the District and the City of Westminster entered into an agreement for the
collection of sewer connection charges, now known as capital facilities capacity
charges, from properties connecting to the local sewer located within the city limits .
Under the terms of the agreement, the District provides the City with a classification of
charges to be collected for the issuance of capital facilities capacity charge permits .
The City , acting as the District's agent , collects the charges on behalf of the District for a
fee equal to five percent (5%) of the charges collected .
In 1976, the District and Midway City Sanitary District entered into a similar agreement
for the collection capital facilities capacity charges from properties connecting to the
local sewer that are located within the unincorporated areas of the Midway City Sanitary
District boundaries .
The Midway City Sanitary District provides the local sewer services to all properties
within the City of Westminster and to nearby un incorporated areas . Midway City
Sanitary District regulates all connections to its sewerage facilities that ultimately
connect to those of the District. The City of Westminster and the Midway City Sanitary
District have now agreed that it would be more expedient and least burdensome on
affected property owners within the city limits to have the Midway C ity Sanitary District
serve as the collection agent on behalf of the District. The Midway City Sanitary District
is willing to serve as the collection agent on behalf of the District under the same
compensation terms the District currently has with the City of Westminster and Midway
Sanitary Sanitation District, a fee equal to five percent (5%) of the charges collected .
H:ldept\agenda\Board Agenda Reports\2004 B oard Agenda Repo<ts\1004\llem 14(e) MCSD-CityofWest CFCH.doc
Revise<! 06/04/03 Page 1
The City of Westminster will be recommending the approval of the Agreement to
Terminate the Collection of Sewer Connection Fees at the City Council Meeting of
October 19 , 2004 . The Midway City Sanitary District will be recommending the approval
of the Agreement for Collection of Capital Facilities Capacity Charges at the Midway
City Sanitary District Board Meeting of October 5, 2004.
PRIOR COMMITTEE/BOARD ACTIONS
On October 10, 1973, the District entered into an Agreement for Collection of Sewer
Connection Charges with the City of Westminster.
On October 13 , 1976, the District entered into an Agreement for Collection of Sewer
Connection Charges with the Midway City San itary District. ·
PROJECT/CONTRACT COST SUMMARY
NIA
BUDGET IMPACT
D
D
D
~
This item has been budgeted . (Line item: )
This item has been budgeted , but there are insufficient funds .
This item has not been budgeted .
Not applicable (information item)
ATTACHMENTS
1. Propose Agreement to Terminate Collection of Sewe r Connect ion Charges w ith
the City of Westminster.
2. Propose Agreement for Collection of Capital Facilities Capacity Charges with the
Midway City San itary District.
H·ldepl\agenda\Board Agenda Reports\2004 Board Agenda Reports\1004\ltem 14(e) MCSD-CotyolWeslCFCH.doc
Revised 06/04103 Page 2
..
I
AGREEMENT TO TERMINATE
COLLECTION OF SEWER CONNECTION CHARGES
THIS TERMINATION AGREEMENT is entered into by and among the City of
Westminster ("City") and Orange County Sanitation District ("OCSD") as follows:
RECITALS
WHEREAS, the City and OCSD entered into a Standard Agreement for Collection of
Sewer Connection Charges on October 10, 1973, subsequently as supplemented and
amended (and apparently misdated as of August 8, 1973) (together, the "1973
Agreemenr);
WHEREAS, section 8 of the 1973 Agreement states that the 1973 Agreement can
be terminated with a 180-day notice by either party;
WHEREAS, the City and OCSD have determined that it is in their best interest to
terminate the 1973 Agreement;
WHEREAS, the City and OCSD agree to shorten the notification period set forth in
section 8 of the 1973 Agreement and to have the termination effective as of October 1,
2004;
NOW, THEREFORE, THE PARTIES AGREE AS FOLLOWS:
1. Effective November 1, 2004 or at such time that a binding agreement
becomes effective between Midway City Sanitation District ("MCSD") and OCSD for
collection by MCSD of all OCSD capital facilities capacity charges which become due in the
City of Westminster, whichever is later, the 1973 Agreement shall be deemed terminated.
2. Commencing on the effective date of this Termination Agreement, the City
shall henceforth refer to MCSD all persons or entities ( 1) applying for a building permit to
construct a new building or structure requiring connection to the sewer system and (2) who
apply for a building permit to expand an existing building or structure, which increases the
number of bedrooms in residential buildings or increases square footage in non-residential
buildings, for the collection by MCSD of OCSD capital facilities capacity charges. The City
shall not issue building permits for such buildings or structures absent proof of payment by
the applicant of applicable OCSD capital facilities capacity charges.
3. This Termination Agreement may be executed in counterparts and the
signatures of the parties attached creating one Agreement.
4. The Recitals above are hereby incorporated into this section as though fully
set forth herein and each party acknowledges and agrees that such Party is bound, for
purposes of this Termination Agreement, by the same.
.oc 1
5. This Termination Agreement constitutes the entire agreement between the
parties and supersedes all prior negotiations, arrangements, representations and
understandings, if any, made by or among the parties with respect to the subject matter
hereof. No amendments or other modifications of this Termination Agreement shall be
binding unless executed in writing by both parties hereto, or their respective successors,
assigns or grantees.
6. The terms of this Agreement shall remain in effect until the Parties mutually
agree in writing to terminate the Agreement.
APPROVED AS TO FORM:
CITY ATTORNEY
By
APPROVED AS TO FORM:
THOMAS L. WOODRUFF
OCSD COUNSEL
By~~~--~~~~
.oc
CITY OF WESTMINSTER
By
Mayor
By
City Clerk
ORANGE COUNTY SANITATION DISTRICT
By
Chairman, Board of Directors
By
Board Secretary
2
~
.,,.
AGREEMENT FOR COLLECTION OF
CAPITAL FACILITIES CAPACITY CHARGES
THIS AGREEMENT is made and entered into, to be effective the --day of 2004 by and between:
AND
ORANGE COUNTY SANITATION DISTRICT.
hereinafter referred to as "OCSD";
MIDWAY CITY SANITARY DISTRICT,
hereinafter referred to as "Sanitary District".
W I T N E S S E T H:
WHEREAS, OCSD has by the enactment of Ordinance No. OCSD-22,
established a schedule of capital facilities capacity charges applicable to new
construction and expansion of existing buildings and structures; and
WHEREAS, Sanitary District provides the local sewer services to all
properties within the City of Westminster and to nearby unincorporated areas. All
of the territory of Sanitary District is within the area for which OCSD provides
regional sewer services and, therefore, is subject to District's Ordinance No.
ocso .. 22; and
WHEREAS, Sanitary District regulates all connections to its sewerage
facilities, and Sanitary District's sewerage facilities are connected to those of
OCSD; and
WHEREAS, OCSD and Sanitary District desire that the capital facilities
capacity charges provided for in OCSD's Ordinance No. OCSD-22, be collected
in a manner most expedient and least burdensome on affected property owners;
and
WHEREAS, Sanitary District will benefit by the construction and
maintenance of sewerage facilities of OCSD within the boundaries of Sanitary
District from the funds to be collected from said capital facilities capacity charges
("Charges").
NOW, THEREFORE, it is mutually agreed as follows:
Section 1: (a) Sanitary District as agent of OCSD will and does
hereby agree to issue connection permits and collect the Charges established by
OCSD under Ordinance No. OCSD-22, as amended from time to time, for all of
.ot
Page 1 of4
the improved territory of OCSD within the city limits of the City of Westminster
and the unincorporated areas within the Sanitary District.
(b) If Sanitary District is presented with a dispute as to
the validity, reasonableness, enforceability, or applicability of the Charges agreed
to be collected by it for OCSD, Sanitary District may notify OCSD of the problem,
and OCSD shall take over the collection and enforcement of its Ordinances in
subject cases.
Section 2: OCSD shall prescribe those classifications of Charges to 'be
collected by Sanitary District.
Section 3: (a) Sanitary District shall account for the Charges
collected and remit to OCSD monthly the monies so collected, except as
provided in Section 6 hereof.
(b) Sanitary District shall not be liable to OCSD for its
unintentional and inadvertent failure to collect a Charge actually due OCSD or its
unintentional or inadvertent miscalculation of the amount of the Charges due
OCSD.
Section 4: Procedures mutually agreeable to Sanitary District and
OCSD shall be established for collection and remittance of said Charges.
Section 5: OCSD does hereby appoint and nominate Sanitary District
and its agents and employees, as the same may be designated by Sanitary
District, as agents of OCSD for the purpose of issuing connection permits and
determining and collecting the capital facilities capacity charges established
under Ordinance No. OCSD-22, as amended from time to time. This appointment
does not authorize Sanitary District to act as Agent for OCSD's General
Manager or to perform the duties of OCSD's General Manager, as set forth and
established in OCSD Ordinance No. OCSD-22, and any amendments thereto,
except as expressly set forth in this Agreement.
Section 6: (a) Sanitary District agrees to act as agent for OCSD as
herein provided for a fee equal to five percent (5%) of the Charges collected by
Sanitary District in exchange for payment of connection permits issued and all
applicable Charges collected pursuant to the provisions of this Agreement and
Ordinance No. OCSD-22. Monthly, the five percent (5%) fee of Sanitary District
shall be deducted from the Charges collected by Sanitary District, and the
remaining balance thereof shall be remitted to OCSD pursuant to Section 3
herein.
(b) OCSD hereby agrees to hold Sanitary District free
and harmless of any and all liability that might arise if any such Charges collected
by Sanitary District shall be determined to have been illegally collected. This shall
.oc
Page 2of4
-
mean the repayment to Sanitary District of any costs and expenses reasonably
incurred in addition to the reimbursement of said illegally collected Charges and
damages in connection therewith.
( c) OCSD agrees to provide legal services in the defense
of any action seeking a refund of capital facilities capacity charges alleged to
have been illegally collected.
Section 7: It is agreed that at the request of either party hereto, formal
renegotiation of this Agreement shall be made at two (2) years from the effective
date hereof.
Section 8: This Agreement may be tenninated by either party giving not
less than ninety {90) days' written notice to the other party, designating a
tennination date, which date shall be the first day of a calendar month.
Section 9: This Agreement constitutes the entire agreement between
the Parties and supersedes all prior negotiations, arrangements, representations,
and-understandings, if any, made by or among the parties with respect to the
subject matter hereof. No amendments or other modifications of this Agreement
shall be binding unless executed in writing by both Parties hereto, or their
respective successors, assigns, or grantees.
Section 10: This Agreement and any dispute arising hereunder shall be
governed and interpreted in accordance with the laws of the State of California.
This Agreement shall be construed as a whole according to its fair language and
common meaning to achieve the objectives and purposes of the Parties hereto,
and the rule of construction to the effect that ambiguities are to be resolved
against the drafting Party shall not be employed in interpreting this Agreement,
all Parties having been represented by counsel in the negotiation and preparation
hereof.
Section 11: Except as may be specifically provided for herein, nothing
contained in this Agreement is intended to confer, nor shall this Agreement be
construed as conferring, any rights, including, without limitation, any rights as
third-party beneficiary or otherwise, upon any entity or person not a Party hereto.
II
II
II
II
.oc
Page 3of4
II
Section 12: This agreement shall become effective on the ___ day
of _____ 2004.
uocsou
ORANGE COUNTY SANITATION DISTRICT
By~~~--~--~--~~----~~
Chair, Board of Directors
Secretary, Board of Directors
"SANITARY DISTRICT"
MIDWAY CITY SANITARY DISTRICT
President
Secretary
.oc
Page 4of4
.... , FAHR COMMIITEE Meeting Date
10/13/04
AGENDA REPORT Item Number
FAHR04-90
Orange County Sanitation District
FROM: Michael D. White , Controller
SUBJECT: APPROVAL OF ROCKY POINT PUMP STATION COMMERCIAL
LEASES
GENERAL MANAGER'S RECOMMENDATION
To Bd . of Dir.
10/27/04
Item Number
14(f)
(1) Approve a Lease Agreement with Nautical Yacht Sales for the period of 21
months , commencing September 1, 2004 through May 31, 2006, at the rate of $5,000
per month; and ,
(2) Approve an Office Lease Agreement with John R. Finnell on a month-to-month
basis, commencing September 1, 2004, at the rate of $250 per month .
SUMMARY
The District purchased three (3) adjacent parcels along Coast Highway in Newport
Beach from International Bay Clubs (IBC) on September 1, 2004, for the purpose of
constructing the new Rocky Point Pump Station . As part of the Purchase Agreement,
the District assumed the leases of two tenants currently occupying portions of the
property. The southernmost parcel is occupied by Nautical Enterprises , Inc., dba H&S
Yacht Sales. A multi-unit office building sits on the middle parcel , and John R. Finnell
leases one ground floor office . The remainder of the office building is vacant. The terms
of both tenants' leases with IBC have expired , and both tenants currently occupy the
premises on a month-to-month basis , pursuant to the "holdover" provisions of those
leases .
A building formerly containing an antique shop sits upon the northernmost parcel. This
building is vacant. It is near this location that the new pump station will be built.
However, the existing buildings on the other two parcels will likely be demolished at the
outset of construction and the land used for construction staging and parking .
Construction for the new pump station is tentatively scheduled to begin in
approximately June, 2006 , but it is possible construction may begin as early as
February 2006.
Since construction of the new pump station is not scheduled to begin for approximately
another 16-20 months, the District desires to continue leasing out the premises to the
two existing tenants. Attached are proposed leases for each tenant, which are
designed to protect District's interest in the property, minimize its liability exposure, and
provide it with flexibility to terminate the leases should the pump station construction
timetable be moved up or other circumstances necessitate . Due to the short-term
nature of these leases, staff has proposed continuing these leases with monthly
payments remaining the same as was negotiated with the previous landlord, $5 ,000 per
month due from H&S Yacht Sales and $250 per month due from John R. Finnell.
H.ldept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1 004\ltem 14(1).Roeky P t Pump Stati on.doc
Revised 06/04/03 Page 1
PRIOR COMMITTEE/BOARD ACTIONS
On August 25 , the Board approved the purchase of this approximate one-acre parcel in
the City of Newport Beach from International Bay Clubs , Inc., for Replacement of Rocky
Point Pump Station .
PROJECT/CONTRACT COST SUMMARY
The approval of this recommendation will generate $5,250 in monthly lease income over
the next 16-20 months at no additional out-of-pocket cost to the District.
BUDGET IMPACT
0 This item has been budgeted . (Line item: )
0 This item has been budgeted , but there are insufficient funds.
0 This item has not been budgeted .
[;8J Not applicable (information item)
ATTACHMENTS
1. Propose Lease Agreement with H&S Yacht Sales .
2 . Propose Lease Agreement with John R. Finnell , CPA.
MW
H·\deptlagenda\Board Agenda Reports\2004 Board Agenda Report s\1004\llem 14(1) Rocily P t Pump Sta tion doc
Revised 06/04/03 Pag e 2
,
_,
...
LEASE AGREEMENT
BETWEEN
ORANGE COUNTY SANITATION DISTRICT
AND
NAUTICAL ENTERPRISES, INC. dba H & S YACHT SALES
This Lease Agreement ("Agreement" or "Lease") is entered into this 1st day of
September, 2004 ("Effective Date") by and between ORANGE COUNTY SANITATION
DISTRICT ("OCSD" or "Landlord") and NAUTICAL ENTERPRISES, INC., A
CALIFORNIA CORPORATION, OBA H & S YACHT SALES ("H & S" or "Tenant").
RECITALS
A. Landlord is a single purpose government entity created pursuant to the County
Sanitation District Act of 1923, is a political subdivision of the State of California, and
provides wastewater treatment for portions of Orange County, including Newport Beach,
California.
B. Landlord is the owner of certain real property located in the City of Newport
Beach, County of Orange, State of California, including the real property and the
buildings and other improvements located thereon, commonly known as 1700 West
Coast Highway, and described as Assessor's Parcel No. 049-222-31, Lots 61, 62, and
63 of Tract 1210 ("Premises").
C. Landlord purchased the Premises from International Bay Club, International, Inc.
on or about September 1, 2004, as part of a plan to replace the existing Rocky Point
Pump Station.
D. Landlord desires to construct a new pump station and associated structures on
or near the Premises, beginning in approximately June 2006.
E. Landlord and Tenant acknowledge that construction of the desired pump station
and associated structures will require the demolition and destruction of some or all of
the existing structures on the Premises and the current use of the Premises to cease.
F. Tenant currently occupies the Premises on a month-to-month basis pursuant to
the "Holding Over" terms of a written lease agreement with the Premises' prior owner,
International Bay Clubs, Incorporated, which lease has expired.
G. Landlord desires to lease to Tenant and Tenant desires to lease from Landlord,
the Premises, upon the terms and conditions set forth herein.
NOW THEREFORE, the parties hereto agree as follows:
191695.1 1
AGREEMENT
1. Premises.
1.1 Landlord hereby leases to Tenant and Tenant hereby leases from
Landlord, the Premises, upon the terms and conditions set forth in this Agreement.
1.3 Tenant has inspected and accepts the Premises "As Is" and in its present
condition and makes no demand on Landlord for any improvements or alteration
thereof.
1.4 The title to the Premises and any improvements thereon, present or
future, shall remain in Landlord or Landlord's successor or assignee. Tenant agrees
never to assail, contest, or resist said title.
2. Term.
2.1 The term of this Lease shall be for a period of twenty-one (21) months,
commencing September 1, 2004 and ending May 31, 2006, unless sooner terminated
as hereinafter provided.
2.2 Possession of the Premises, including all structures, buildings, and/or
improvements thereon, shall be surrendered to Landlord immediately upon expiration or
termination of this Lease.
2.3 In the event Tenant holds over beyond the term herein provided with the
express or implied consent of the Landlord, such holding over shall be on a month-to-
month basis, subject to all the terms and conditions of this Lease, and at the monthly
compensation provided herein. Such holding over shall not be construed as a renewal
of this Lease.
2.4 This Lease may be terminated prior to the expiration of its term by mutual
written agreement of the parties or as provided in Paragraph 24.
3. Rent.
3.1 Tenant shall pay to Landlord a monthly rent of five-thousand dollars
($5,000). Rent for the first month of the Lease will be prepaid on or before September 1,
2004. Subsequent rent shall be payable monthly, in advance, on the first day of each
month.
3.2 Rent shall be payable at the Landlord's office at P.O. Box 8127, Fountain
Valley, CA 92728, or at such other place or places as Landlord from time to time may
designate by notice provided pursuant to Paragraph 22 herein.
191695.1 2
3.3 Rent and other sums due Landlord under this Lease shall be due as
specified in this Lease and shall bear interest at the rate of five percent (5.0%) per
annum until paid, if not paid within ten (10) calendar days after the date on which the
payment is due. In no event, however, shall any such interest charges exceed the
maximum amount permitted by law.
4. Late Charges.
4.1 Tenant acknowledges that late payment of rent or other sums due will
cause Landlord to incur costs, the exact amount of which will be difficult to ascertain.
Accordingly, if any installment of rent or any other sum due from the Tenant is not
received by Landlord within ten (10) days of the date on which it is due, Tenant shall
pay to Landlord, in addition to principal and interest plus any other amounts owing, the
lesser of the maximum amount allowed by law or ten percent ( 10%) of such overdue
amount. In addition, Tenant shall pay Landlord any attorneys' fees or notice/process
service fees incurred by Landlord by reason of Tenant's failure to pay rent or other
charges when due hereunder. In addition, all unpaid amounts shall accrue interest at
the lesser of the maximum rate allowed by law or 5% per annum until paid.
5. Security Deposit.
5.1 Concurrently with Tenant's execution of this Lease, Tenant shall deposit
with Landlord a security deposit in the amount of five thousand dollars ($5,000).
Tenant's security deposit shall be held by Landlord as security for the faithful
performance by Tenant of all the terms of this Lease. If Tenant defaults with respect to
any provision of this Lease, Landlord may (but shall not be required to do so) without
prejudice to any other remedy, use, apply or retain all or any part of the security deposit
for the payment of any sum in default, or for any amount which Landlord may become
obligated to spend by reason of Tenant's default, or for any other loss or damage which
Landlord may suffer by reason of Tenant's default. If any portion of the security deposit
is so used or applied, Tenant shall, within five (5) days after written demand, deposit
cash with Landlord sufficient to restore the security deposit to its original amount.
Landlord shall not be required to keep the security deposit separate from its general
funds, and Tenant shall not be entitled to interest on such deposit. If Tenant fully
performs every provision of this Lease, the security deposit or any balance thereof shall
be returned to Tenant within thirty (30) days following expiration of the Lease.
6. Taxes and Assessments.
6.1 Should the property interest conveyed by this Lease be subject to real
property taxation and/or assessments, the Landlord will be responsible for the payment
of all real property taxes. In addition to the rent described in section 3 above, Tenant
shall pay, before delinquency all lawful, assessments, fees, or charges which may be
levied by the State, County, Landlord, or any other assessment-levying body upon the
Premises and any improvements located thereon. To the extent Landlord pays
assessments, fees, or charges required to be paid by Tenant pursuant to this
191695.1 3
Paragraph, Tenant shall reimburse Landlord within ten (10) days after receipt of written
notice as provided pursuant to Paragraph 22 herein.
6.2 Tenant shall pay, before delinquency, all taxes, assessments, fees, and
charges on personal property, goods, merchandise, fixtures, appliances, and equipment
used on the Premises.
7. Utilities.
7 .1 Tenant shall be responsible for providing any and all utilities, including, but
not limited to, all water, gas, heat, light, power, telephone, and other utility services,
required by Tenant during the term of this Lease, together with any taxes thereon and
for all connection charges. If any such services are not separately metered to Tenant,
the Tenant shall pay a reasonable proportion, to be determined by Landlord, of all
charges jointly metered with other premises.
8. Permitted Uses of Premises.
8.1 Generally. The Premises shall be used by Tenant exclusively for the
purposes of assembly, sales, display, storage, and office space associated with
Tenant's operations as a dealer of new and used yachts. Notwithstanding the
foregoing, Tenant shall not cause or permit the Premises to· be used in any way which
(i) constitutes a violation of any law, ordinance, or governmental regulation or order
regulating the manner of use by Tenant of the Premises (including, without limitation,
any law ordinance, regulation or order relating to Hazardous Materials), (ii) constitutes a
nuisance or waste, or (iii) increases the cost of any insurance relating to the Premises
paid by Landlord. Tenant shall obtain, at its sole cost and expense, all governmental
permits, licenses and authorizations of whatever nature required by any governmental
agencies having jurisdiction over Tenant's use of the Premises. Further, Tenant, at its
sole cost, will comply with all applicable governmental laws and regulations in
connection with its operations within the City of Newport Beach. Tenant will also
comply with any and all reasonable rules and regulations promulgated by Landlord.
The Premises shall be used solely for the use described in this Section 8 and for no
other use or purpose. No signage shall be installed on the Premises or within the City
of Newport Beach without receipt of the prior written approval of Landlord.
8.2 Hazardous Materials. As used in this Lease, the term "Hazardous
Materials" means any flammable items, explosives, radioactive materials, hazardous or
toxic substances, material or waste or related materials, including any substances
defined as or included in the definition of "hazardous substances", "hazardous wastes",
"hazardous materials" or "toxic substances" now or subsequently regulated under any
applicable federal, state or local laws or regulations, including without limitation
petroleum-based products, paints, solvents, lead, cyanide, DDT, printing inks, acids,
pesticides, ammonia compounds and other chemical products, asbestos, PCBs and
similar compounds, and including any different products and materials which are
subsequently found to have adverse effects on the environment or the health and safety
191695.1 4
,
of persons. Tenant shall not cause or permit any Hazardous Materials to be generated,
produced, brought upon, used, stored, treated or disposed of in or about the Premises
by Tenant, its agents, employees, contractors, sublessees or invitees in violation of any
applicable laws, codes, ordinances or regulations governing the same.
9. Tenant Improvements.
9.1 Except as may exist on the Premises as of the Execution Date, no
structure, sign or other improvement of any kind shall be constructed on the Premises
by Tenant, its employees, agents or contractors without the prior written approval of
Landlord in each case. Approval may be withheld, conditioned or delayed in Landlord's
sole and absolute discretion. No changes, modifications or alterations from approved
plans and specifications may be made without Landlord's prior written approval. No
approval by Landlord of any plans or specifications shall constitute (i) approval of
architectural or engineering sufficiency or representation, or (ii) warranty by Landlord as
to the adequacy or sufficiency of the plans and specifications or the improvements
contemplated for Tenant's use or purpose. Landlord, by approving the plans and
specifications, assumes no responsibility or liability for any defect in any improvements
constructed on the basis of the plans and specifications. Tenant expressly agrees to
comply with all applicable signage ordinances.
9.2 Tenant shall permit Landlord to inspect the Premises during construction
of the Improvements.
9.3 Except as otherwise provided in this Lease, ownership of all
Improvements on the Premises shall immediately vest and remain vested in Landlord,
without compensation being paid therefore by Landlord.
9.4 Tenant shall construct, perform, complete, and maintain all Improvements
in a good and workmanlike manner and with high quality materials, and shall furnish all
tools, equipment, labor, and material necessary to perform and complete the same.
9.5 Upon termination of this Lease, Tenant shall assign to Landlord all
express warranties furnished by other persons and remaining in effect in connection
with the construction and installation of the Improvements.
10. Maintenance and Repairs.
10.1 Tenant shall, at its sole cost and expense during the term of this Lease,
keep and maintain the Premises and all Improvements, fixtures, and equipment
thereon, in good, operable, usable, and sanitary order and repair, and in a good, safe,
and first-class condition, providing for such repairs, replacements, rebuilding, and
restoration as may be required by Landlord to comply with the requirements of this
Lease. Tenant shall furnish all necessary equipment, supplies, and material of good
quality and in sufficient quantity to fulfill the requirements of this Lease and to maintain
an acceptable and professional level of maintenance. Any replacements, rebuilding,
191695.1 5
restoration and/or modifications or additions to the Premises shall have the prior written
approval of Landlord.
10.2 Tenant shall, at its sole cost and expense during the term of this Lease,
maintain in good condition the landscaping on the entire Property.
10.3 Tenant shall, at its sole cost and expense during the term of this Lease,
keep the Premises free and clear of rubbish and litter and shall deposit rubbish and litter
in designated trash containers. No offensive matter or refuse or substance constituting
an unnecessary, unreasonable, or unlawful fire hazard, or material detrimental to the
public health shall be permitted to remain on the Premises and Tenant shall prevent any
accumulation thereof from occurring.
10.4 All work performed under this Paragraph 10 shall be performed in
accordance with the highest industry-wide standards at a frequency sufficient to
maintain the first-class condition of the Premises.
10.5 Landlord has the right to conduct regularly scheduled maintenance
inspections of the Premises.
10.6 Tenant shall provide Landlord with the names and telephone numbers of
at least two (2) qualified persons who can be contacted by Landlord's representatives if
an emergency maintenance or repair condition occurs during the hours when Tenant's
normal work force is not present. Landlord shall call for such assistance only in the
event of a genuine and substantial emergency.
11. Capital Repairs and Improvements.
11.1 Tenant acknowledges and agrees that as the prior lessee of the Premises
it has substantial knowledge as to the condition of the Premises and that it is Landlord's
intent to demolish the existing structures and construct a pump station on or near the
Property after the surrender of the Premises by Tenant. As such, should the need for
capital repairs or improvements to the Premises arise during the original Lease Term
(including, without limitation (i) improvement or repair of the structural components of
any improvements on the Premises [including, the exterior walls, foundation, slab and
structural columns and all components of the roof], (ii) improvement, repair or
replacement of any plumbing, electric, fire sprinkler, lighting, HVAC, mechanical and
sewer systems in or servicing any improvements on the Premises, or (iii) any retrofits,
upgrades, replacements and the like), such repairs or improvements shall be completed
by Tenant itself, at Tenant's sole and exclusive cost, in good workmanlike manner, and
only to the extent necessary for the occupancy of the Premises by Tenant for the
duration of the Term. Tenant hereby waives its rights to compel Landlord to repair,
replace, upgrade or otherwise maintain the Premises.
11.2 The provisions of Section 9, above, regarding Tenant Improvements shall
also be applicable to all Capital Repairs and Improvements made under this Section 11.
191695.1 6
'
' •
12. Operating Responsibilities.
12.1 Tenant shall operate, maintain, manage and keep the Premises in good
repair.
12.2 Tenant shall conform to abide by all applicable City and County
Ordinances and all State and Federal laws and regulations and shall obtain all required
permits and licenses necessary for the operation of its facilities.
12.3 Tenant shall exercise every reasonable effort to prevent loud, boisterous,
or disorderly person from loitering about the Premises.
12.4 Tenant shall not knowingly permit any illegal activities to be conducted
upon the Premises.
12.5 Tenant may, at its own expense, place signs upon the Premises or
Improvements subject to the prior written approval of Landlord. The placement of such
signs shall comply with applicable law. All signage placed upon the Premises or
Improvements by Tenant shall remain the Tenant's property and shall be removed by
Tenant upon termination or expiration of this Lease at Tenant's expense. Any damage
caused by such removal shall be repaired at Tenant's expense.
12.6 Tenant shall maintain an adequate and proper staff. Landlord may at any
time give Tenant written notice of noncompliance with this Lease. Tenant shall take all
reasonable measures to ensure that the conduct and activities of Tenant's employees
shall not be detrimental to the interest of the public.
12.7 Tenant may provide any legal devices, mechanisms, or equipment
designed for the purpose of protecting the Premises from theft, burglary, or vandalism,
provided that installation thereof does not adversely affect Landlord's use of the
Property. All such purchases and installations shall be at Tenant's sole expense. Upon
Landlord's request, during the last thirty (30) days preceding the expiration or
termination of this Lease, Tenant shall remove same from the Premises, except for
those items which have been so affixed that their removal cannot be accomplished
without damage to the Premises.
12.8 Tenant, at its sole cost and expense, shall provide and install any
appliances, furniture, fixtures, equipment, padlocks, or personal property required for
the operation of the Premises. Upon Landlord's request, during the last thirty (30) days
preceding the expiration of termination of this Lease, Tenant shall remove same from
the Premises, except for those items which have been so affixed that their removal
cannot be accomplished without damage to the Premises. Should Tenant fail to remove
same within the required thirty (30) day period, Tenant shall lose all right, title, and
interest therein, and Landlord may elect to keep same upon the Premises or to sell,
191695.1 7
remove, or demolish same. Tenant shall reimburse Landlord for any cost incurred in
the removal or demolition thereof, in excess of any consideration received from any sale
of such equipment.
12.9 Tenant shall immediately correct any unsafe condition on the Premises, as
well as any unsafe practices occurring thereon. Tenant shall cooperate fully with
Landlord in the investigation of any injury or death occurring on the Premises, including
a prompt report thereof to Landlord.
12.1 O Tenant shall not use or permit the use of the Premises in any manner
which creates a nuisance or a measurable annoyance to persons outside the Premises,
including, without limitation, live, recorded, or broadcasted entertainment or the use of
loud speakers or sound or light apparatus other than as may be required by law or be
necessary or advisable for safety purposes.
12.11 Tenant agrees to allow inspection of the Premises, at all reasonable times,
by Landlord, State officials, County officials, and fire officials.
12.12 Tenant shall construct, operate and maintain its facilities in a manner
which does not cause damage to Landlord's facilities on the Property or interfere with
the operation, maintenance and repair by Landlord of such facilities. Nothing in this
Lease shall impose on Landlord the obligation to maintain or repair the Premises or the
facilities constructed by Tenant.
13. Insurance.
13.1 Tenant shall provide and maintain at its own expense during the term of
this Lease the following insurance covering its operations and activities under this
Lease. Such insurance shall be provided with insurers licensed to do business in the
State of California, with a rating of at least "A-VIII," according to the latest Best's Key
Rating Guide. Evidence of such insurance shall be delivered to Landlord on or before
the effective date of this Lease on Landlord's own form. The Certificate of Insurance
shall specifically identify this Lease and shall contain express conditions that Landlord is
to be given at least thirty (30) days advance written notice by the insurer, of any material
modification in or termination of insurance. Such insurance, shall be primary to and not
contributing with any other insurance maintained by Landlord, and shall name the
Landlord, and its officers, agents and employees as additional insureds. All insurance
shall be on an occurrence basis and shall meet the following requirements:
13.1.1 General Liability Insurance. Comprehensive general liability
insurance covering the Premises, and Tenant's construction operations and other
activities on the Premises in contractual, broad form property damage, and personal
injury, with a combined single limit of not less than one million dollars ($1,000,000.00)
per occurrence.
191695.1 8
13.1.2 Automobile Liability Insurance. Automobile liability insurance
covering owned and non-owned vehicles with a combined single limit of not less than
three hundred thousand dollars ($300,000.00) per occurrence.
13.1.3 Workers Compensation Insurance. Workers compensation
insurance in an amount and form meeting all applicable requirements of the California
Labor Code, covering all persons providing services by or on behalf of Tenant and all
risks to such persons.
13.1.4 Fire and Extended Coverage Insurance. A standard form all-risk
policy for the actual cash value covering fire and extended coverage, theft, burglary,
vandalism, malicious mischief, sprinkler leakage and other perils of direct physical loss
or damage insuring the personal property, trade fixtures, equipment, and improvements
of Tenant.
13.2 Failure by Tenant to procure or maintain required insurance shall
constitute an event of default, upon which Landlord may immediately terminate this
Lease. Tenant's operations shall be subject to suspension by Landlord during any
period Tenant fails to maintain required insurance in full force and effect.
13.3 Risk of Loss. Landlord shall not be liable for any injury to Tenant's
business or loss of income therefrom or for injury to any person or for any damage to
personal property, good, wares, or merchandise sustained by Tenant or others that are
caused by any defects in said Premises, or any service facilities or due to the
happening of accident, including any damage caused by water, wind storm, or by any
gas, steam, electrical wiring, sprinkler system, plumbing, heating or conditioning
apparatus; or acts or omissions of co-tenants or other occupants of the Premises, or
hereafter occurring therein or due to any part or appurtenance thereof, including any
and all furniture, fixtures, and equipment of Tenant becoming out of repair, or from any
act or omission of Tenant.
13.4 Waiver of Subrogation. Tenant hereby releases Landlord from liability and
waives all right of recovery against Landlord for any loss in or about the Premises from
perils insured against under its fire, property, or liability insurance contracts, including
any all risk endorsements thereof, whether due to negligence or any other cause,
provided that this Section shall be inapplicable if it would have the effect, but only to the
extent it would have the effect, of invalidating any insurance coverage of Landlord or
Tenant. Nothing herein shall relieve Tenant of its obligation to request and procure, to
the extent available on a commercially reasonable basis, the necessary endorsements
required to validly waive subrogation in accordance with this paragraph. Tenant shall,
at the request of Landlord, execute and deliver to Landlord a Waiver of Subrogation in
the form and content as reasonably required by Landlord's insurance carrier. To the
extent Tenant fails to maintain the insurance required under the terms of this Lease,
such failure shall be a defense to any claim asserted by Tenant against Landlord by
reason of any loss sustained by Tenant due to circumstances that would have been
covered had such required insurance been maintained.
191695.1 9
13.5. Landlord's Substitute Performance. If Tenant fails to procure, maintain and
pay for, at the times and for the durations specified in this Lease, any insurance
required by this Lease or fails to carry insurance required by law or governmental
regulation, Landlord, at any time or from time to time and without notice, may, at its
option, procure such insurance and pay the premiums therefore, in which event Tenant
shall repay all sums so paid by Landlord, together with interest thereon as provided in
the Lease, and any costs or expenses incurred by Landlord in connection therewith
within ten (10) days following Landlord's written demand to Tenant for such payment.
14. Destruction of Premises.
14.1 In the event the Premises shall be totally or partially destroyed by a risk
covered by insurance required by this Lease, Landlord shall be entitled to make the loss
adjustment with the insurance company insuring the loss and receive payment of the
proceeds of insurance.
14.2 If the damage to the Premises cannot lawfully and reasonably be repaired
within sixty (60) days after the date of damage, this Lease may be terminated by written
notice of either party. If the Premises can reasonably be repaired within the sixty (60)
day period, or if this Lease is not terminated in accordance with this provision, Tenant
may opt to restore the Premises. In the event Tenant chooses to restore the Premises,
said insurance proceeds, if any, shall be held by Landlord for the benefit of Tenant and
shall be disbursed in installments as construction progresses for payment of the costs of
restoration or reconstruction, upon satisfactory performance of the work required, and
release of mechanics liens by all persons furnishing labor and materials thereon. If the
insurance proceeds are insufficient to pay the actual costs of restoration or
reconstruction, Tenant shall deposit the amount of the deficiency with Landlord upon
demand therefore by Landlord, and said sums shall be held for payment of said costs
and disbursed in the manner heretofore provided. Any undistributed funds shall be
retained by Landlord and credited to the rent due over the remaining term of this Lease.
14.3 If Tenant elects to restore the Premises, written plans, specifications, and
construction cost estimates for the restoration shall be prepared by Tenant and
forwarded to Landlord for approval prior to the performance of any work. Said
documents shall be prepared and submitted in a timely manner following adjustment of
the loss and receipt of the proceeds of insurance by Landlord. The required
construction shall be performed by Tenant and/or licensed and bonded contractor(s),
who shall be required to carry comprehensive liability and property damage insurance,
workers compensation insurance, and standard fire and extended coverage insurance,
with vandalism and malicious mischief endorsements, during the period of construction,
in amounts equal to insurance limits required herein, or in greater amounts if otherwise
reasonably required by Landlord. Said construction shall be commenced promptly
following approval by Landlord, the issuance of applicable permits and posting of the
construction site by Landlord with notice of non-responsibility, and shall be diligently
prosecuted to completion. All work shall be performed in accordance with the approved
191695.1 10
plans and specifications, unless changes are approved in writing, in advance, by
Landlord. Tenant agrees that Landlord may have on the site at any time during the
construction period, an inspector who shall have the right to access the Premises and
the work occurring thereon. Tenant, at the commencement of the construction work,
shall notify Landlord in writing of the identity, place of business, and telephone number
or responsible person(s) in charge of construction. Tenant shall ensure that all
construction shall be performed in a good and workmanlike manner. Upon completion
of the restoration, Tenant shall immediately record a notice of completion with the
Orange County Recorder.
14.4 In the event the Premises shall be totally or partially destroyed by a risk for
which insurance coverage is not required or provided herein, Landlord, in its sole
discretion, may either restore Premises or terminate this Lease by providing notice to
Tenant pursuant to Paragraph 22 herein.
14.5 If Tenant elects not to restore the Premises, the insurance proceeds shall
be first used to demolish and clear the Premises. Thereafter, following Landlord's
compensation for any amounts remaining owing to Landlord pursuant to· this Lease,
Tenant shall be entitled to the remainder of the insurance proceeds.
14.6 Under no circumstances shall Landlord have any obligation to restore or
reconstruct the Premises.
15. Reconstruction Affecting Premises.
15.1 In the event Tenant elects to partially or fully reconstruct or cause to be
constructed a new facility because of destruction of the Premises as described in
Paragraph 14.1, this Lease shall continue in full force and effect.
15.2 Tenant agrees to accept the remedy provided in this Lease in the event of
destruction or damage to the Premises, and hereby waives any and all additional rights
and remedies for relief or compensation that may presently be available or may
hereafter be made available against Landlord under the laws and statutes of this State.
16. Condemnation.
16.1 If all or any portion of the Premises are condemned, transferred in lieu of
condemnation, taken by the power of eminent domain, or sold by Landlord under threat
of exercise of said power, Landlord or Tenant may, upon written notice given within (60)
days after the taking or transfer, terminate this Lease.
16.2 Tenant shall not be entitled to share in any portion of the award, and
Tenant expressly waives any right or claims to any part of the award. Tenant shall,
however, have the right to claim and recover, from the condemning authority only, but
not from Landlord, any amounts necessary to reimburse Tenant for the cost of removing
stock and fixtures.
191695.1 11
16.3 Each party hereby waives the prov1s1ons of California Code of Civil
Procedure 1265.130 allowing either party to petition the Superior Court to terminate this
Lease in the event of a partial taking of the premises.
17. Liens.
17 .1 Tenant shall not permit to be placed against the Premises, or any part of
the Premises, any mechanics', materialmen's, contractors', subcontractors' or other
liens. Tenant shall indemnify, defend (with counsel acceptable to Landlord} and hold
Landlord harmless from all liability for any and all liens, claims and demands, together
with the costs of defense and reasonable attorneys' fees related to same. Landlord
reserves the right, at any time and from time to time, to post and maintain on the
Premises, any portion thereof or on the improvements on the Premises any notices of
nonresponsibility or other notice as may be desirable to protect Landlord against
liability. In addition to and not in limitation of Landlord's other rights and remedies under
this Lease, should Tenant fail, within ten (10) days of a written request from Landlord, to
discharge any lien or claim related to Tenant's use of the Premises, or to indemnify,
hold harmless and defend Landlord from and against any loss, damage, injury, liability
or claim arising out of Tenant's use of the Premises as provided herein, then Landlord,
at its option, may elect to pay any lien, claim, loss, demand, injury, liability or damages,
or settle or discharge any action or satisfy any judgment and all costs, expenses and
attorneys' fees incurred in doing so shall be paid to Landlord by Tenant upon written
demand, together with interest thereon at the rate of seven percent (7%} per annum
(but in no event more than the maximum interest rate permitted by law} from the date
incurred or paid through and including the date of payment.
18. Assignment. Sublease, and Encumbrance.
18.1 Tenant shall not voluntarily assign, hypothecate, mortgage or encumber
its interest in the Lease or in the Premises, or sublease or license the use of any part of
the Premises, or allow any other person or entity, except Tenant's authorized
representatives, to occupy or use any part of the Premises without the prior written
consent of Landlord. Landlord may in its sole discretion withhold such consent.
18.2 Any attempted assignment, hypothecation, mortgage, sublease, or license
of the Premises without the prior written consent of the Landlord shall render this Lease
null and void.
18.3 Landlord may assign any or all of its interest in this Lease at any time.
18.4 Each and all of the provisions, agreements, terms, covenants, and
conditions contained in this Lease shall be binding upon any transferee hereof or any
interest herein.
191695.1 12
...
19. Entry.
19.1 Landlord shall have the right to enter the Premises at all times to access
its facilities.
19.2 Tenant shall permit Landlord or its agents to enter upon the Premises at
all reasonable times for the purposes of inspecting the Premises; maintaining or
repairing the Landlord's facilities and appurtenances installed on, in, or through the
Premises; or measuring, testing, or otherwise investigating the Premises in preparation
for construction of the planned pump station.
19.3 Any officers and/or authorized employees of Landlord may enter upon the
Premises at any and all reasonable times for the purpose of determining whether or not
Tenant is in compliance with the terms and conditions of this Lease, or for any other
purpose incidental to the rights of Landlord within the Premises.
19.4 Should Landlord determine Tenant to be in breach of its obligations under
this Lease, in addition to all other available remedies, Landlord may, but shall not be
obliged to, enter upon the Premises and correct Tenant's deficiencies using Landlord's
forces, equipment, and materials on the Premises, or by employing an independent
contractor. Landlord's cost so incurred, including direct and indirect overhead costs as
determined by Landlord, shall be reimbursed to Landlord by Tenant and/or its sureties
within thirty (30) days of demand thereof.
19.5 In the event of Tenant's abandonment, vacation, or discontinuation of
operations for a period of twenty-one (21) consecutive scheduled working days, Tenant
hereby irrevocably authorizes Landlord's officers, employees, agents, and independent
contractors to (1) take possession of the Premises, including all Improvements,
equipment, and inventory thereon; (2) remove any and all persons or property on the
Premises and place any such property in storage for the account of and at the expense
of Tenant; (3) lease or license the use of the Premises; and (4) after payment of all
expenses of such subleasing or licensing, apply all payments realized therefrom to the
satisfaction and/or mitigation of all damages arising from Tenant's breach of this Lease.
19.6 Entry by the officers, employees, agents or independent contractors of
Landlord upon the Premises for the purpose described in this Paragraph shall be
without prejudice to the exercise of any other rights provided herein or by law to remedy
a breach of this Lease.
20. Performance Meeting.
20.1 Tenant or its designee shall meet with the Landlord's General Manager or
his/her designees at such times as may be requested by Landlord to review Tenant's
performance under this Lease and to discuss any problems under the Lease as
determined by the Landlord.
191695.1 13
21. Breach.
21.1 In the event Tenant shall default in any of its obligations under the Lease
and after written notice to Tenant such default continues for thirty (30) days following
Tenant's receipt of such notice, Tenant shall forfeit all rights under this Lease, and
Landlord or its agents may, at their option, terminate this Lease, by providing notice
pursuant to Paragraph 22, and take immediate possession by action of forcible entry
and detainer or may avail themselves of any legal remedies they may then possess.
22. Notice.
22.1 All notices or other communications required or permitted hereunder shall
be in writing, and shall be personally delivered or sent by registered or certified mail,
postage prepaid, return receipt requested, delivered or sent by electronic transmission,
and shall be deemed received upon the earlier of (i) the date of delivery to the address
of the person to receive such notice if delivered personally or by messenger or
overnight courier; (ii) three (3) business days after the date of posting by the United
States Post Office if by mail; or (iii) when sent if given by electronic transmission. Any
notice, request, demand, direction, or other communication sent by electronic
transmission must be confirmed within forty-eight (48) hours by letter mailed or
delivered. Notices or other communications shall be addressed as follows:
To Landlord:
To Tenant:
Orange County Sanitation District
Post Office Box 8127
Fountain Valley, CA 92728-8127
Attention: General Manager
Telephone: (714) 962-2411
Facsimile: (714) 962-0356
Nautical Enterprises, Inc.
H & S Yacht Sales
Attention: Mr. Michael Berk, President
955 Harbor Island Drive, Suite 110
San Diego, CA 92101
Telephone: ______ _
Facsimile: -------
Either party may, by written notice to the other, designate a different address, which
shall be substituted for that specified above.
191695.1 14
J
23. Events of Default.
23.1 The following shall constitute an event of default:
23.1.1 Tenant's failure to punctually make the payments due under this
Lease, where the delinquency continues for more than ten (10) days from the date such
payment is due.
23.1.2 Tenant's failure to operate in the manner required by this Lease,
where such failure continues for more than ten (10) days following receipt of written
notice from Landlord to correct the condition therein specified.
23.1.3 Tenant's failure to maintain the Premises and Improvements in the
state of repair required under this Lease, and in a clean, sanitary, safe, and satisfactory
condition, where such failure continues for more than ten (10) days following receipt of
written notice from Landlord to correct the conditions therein specified. Where
fulfillment of said maintenance obligation requires activity over a period of time and
Tenant shall have immediately, following receipt of notice, commenced whatever action
may be required to cure the particular default and continued such performance
diligently, said time may be waived in writing in the manner and to the extent
determined by Landlord. In the event Tenant fails to correct any maintenance or repair
deficiency within the prescribed time, Landlord may, at its option, exercise its rights of
entry and repair under Paragraph 19 .4 and/or terminate this Lease as provided in
Paragraph 24.
23.1.4 Tenant's failure to keep, perform, and observe any other promises,
covenants, conditions, and agreements set forth in this Lease, where such failure
continues for more than ten (10) days after receipt of written notice from Landlord to
correct the condition therein specified. Where fulfillment of any maintenance or repair
obligation requires activity over a period of time and Tenant shall have immediately,
following receipt of notice, commenced whatever may be required to cure the particular
default and continued such performance diligently, said time may be waived in writing in
the manner and to the extent determined by Landlord.
23.1.5 The filing of a voluntary petition in bankruptcy by Tenant; the
adjudication of Tenant as a bankrupt; the appointment of a receiver or trustee of
Tenant's assets; the making of a general assignment for the benefit of creditors; a
petition or answer seeking reorganization of Tenant under any Federal reorganization
act; the occurrence of any act which operates to deprive Tenant permanently of the
rights, powers, and privileges necessary for the proper conduct of its operations under
this Lease; the levy of any attachment or execution which substantially interferes with
Tenant's operations under this Lease and which is not vacated, dismisses, stayed, or
set aside within a period of sixty (60) days; or a reasonable determination by Landlord
that Tenant is insolvent.
191695.1 15
23.1.6 The failure to submit written plans for the Improvements on or
before the times designated in this Lease for submission thereof.
23.1.7 The failure to commence required construction of the
Improvements or any phase thereof on or before the time approved by Landlord for
commencement thereof.
23.1.8 The failure to complete construction of the Improvements on or
before the time approved by Landlord for completion thereof.
23.1.9 Tenant's failure to procure or maintain required insurance as
provided in Paragraph 13.
24. Termination of Lease.
24.1 Upon the occurrence of any one or more events of default, Landlord shall
give Tenant ten (10) days written notice, pursuant to Section 22 herein, of the condition
of default. The notice shall also inform Tenant that if the default is not corrected within
the time specified in the notice, this Lease shall be subject to termination. Should
Tenant fail to correct the default within the time specified in the notice, Landlord may
give Tenant written notice of the termination of the Lease, which shall become effective
immediately.
24.2 Upon termination pursuant to Section 24.1, Landlord shall have the right to
take possession of the Premises, including all improvements, equipment, and inventory
located thereon and use same for the purpose of satisfying and or mitigating all
damages arising from termination.
24.3 Action by Landlord to effectuate a termination and forfeiture of possession
shall be without prejudice to its exercise of any other rights provided herein or by law to
remedy a breach of this Lease.
24.4 Notwithstanding Section 2.1, this Lease is revocable at will by either party,
and either party may terminate this Lease for any reason upon thirty (30) days written
notice, pursuant to Section 22 herein.
25. Surrender.
25.1 Upon expiration or termination of this Lease, Tenant shall peaceably
vacate the Premises and shall remove all Improvements, equipment, inventory, and
personalty, unless otherwise mutually agreed, in writing, by the parties. Title to the
Premises and Improvements shall remain vested in Landlord.
25.2 Upon expiration or termination of this Lease, Tenant shall, at Landlord's
request, execute and deliver to Landlord within thirty (30) days after service of written
demand, a good and sufficient quitclaim deed of Tenant's interest in this Lease and the
191695.1 16
Premises. Should Tenant fail or refuse to deliver to Landlord such quitclaim deed,
written notice by Landlord reciting the failure of Tenant to execute and deliver the
quitclaim deed, shall, after ten (10) days from the date or recordation of the notice, be
conclusive evidence against Tenant and all other person claiming under Tenant, of the
termination of this Lease.
26. No Relocation Benefits or Loss of Goodwill.
26.1 Tenant expressly waives any and all relocation assistance, relocation
benefits, or compensation for loss of goodwill, known or unknown, to which it is or might
be entitled upon the termination of the terms of this Lease, including the provisions of
California Civil Code Section 1542. In no event will Landlord be obligated to pay any
costs or charges related to costs, expenses, damages, or other charges Tenant might
incur as a result of its move to or from the Premises, securing new facilities, or
maintaining customer relations.
27. Landlord-Tenant Relationship.
27 .1 This Lease is not intended and shall not be construed to create the
relationship of agent, servant, employee, or representative of the Landlord by Tenant.
27.2 Tenant understands and agrees that all persons furnishing services to
Tenant pursuant to this Lease are, for purposes of workers compensation and liability,
solely employees of the Tenant and not of Landlord.
27.3 Tenant shall bear the sole responsibility and liability for furnishing workers
compensation benefits to any person for injuries from or connected with services
performed on behalf of Tenant pursuant to this Lease.
27.4 Tenant understands and specifically agrees to inform its employees that
Tenant is a tenant of Landlord. Tenant understands and specifically agrees to inform its
employees that Tenant is not an agent, servant, employee, or representative of
Landlord.
27 .5 Tenant understands and specifically agrees to inform its employees that
they are not agents, servants, employees, or representatives of Landlord.
28. Indemnity.
28.1 Tenant, as a material part of the consideration to be rendered to Landlord,
hereby agrees that it will defend (with counsel acceptable to Landlord), indemnify, and
hold harmless Landlord and all of its officers, employees, agents, and independent
contractors thereof from any loss, damage, injury, accident, casualty, liability, claim,
cost or expense (including, but not limited to, reasonable attorneys' fees) of any kind or
character to any person or property (collectively, "Claims") arising from or related to
Tenant's use of the premises, the conduct of Tenant's business, and/or any act or
191695.1 17
omission of Tenant, its employees, agents, contractors, or invitees. Tenant shall not be
liable for such Claims to the extent and in the proportion that the same is ultimately
determined to be attributable to the sole gross negligence or intentional misconduct of
Landlord.
28.2 Tenant hereby assumes all risk of damage to property or injury to person
in or about the Premises from any cause, and Tenant hereby waives all claims in
respect thereof against Landlord.
28.3 All indemnity obligations under this Section shall survive the expiration or
termination of the Lease.
28.4. Landlord shall not be liable for any loss or theft of any property on the
Premises.
29. Attorney Fees.
29 .1 Should either party to this Lease commence an action against the other
party arising out of or in connection with this Lease, the prevailing party shall be entitled
to its attorneys' fees and reasonable costs incurred in litigating any dispute.
30. Waiver.
30.1 Any waiver by Landlord of any default or breach of any covenant,
condition, term, and agreement contained in this Lease, shall not be construed to be a
waiver of any subsequent or other default or breach, nor shall failure by Landlord to
require exact, full, and complete compliance with any of the covenants, conditions,
terms, or agreements contained in this Lease be construed as changing the terms of
this Lease in any manner or preventing Landlord from enforcing the full provisions
hereof.
30.2 No delay, failure, omission of Landlord to exercise any right, power,
privilege, or option arising from any default or breach, nor any subsequent acceptance
of payment then or thereafter by Landlord, shall impair any such right, power, privilege,
or option or be construed as a waiver of or acquiescence in such default or breach, or
as a relinquishment of any right.
30.3 The rights, powers, options, privileges, and remedies available to Landlord
under this Lease shall be cumulative.
31. Subordination, Attornment and Estoppel Certificate.
31.1 Subordination. Upon written request of Landlord, Landlord's mortgagee,
the beneficiary of a deed of trust of Landlord or a lessor of Landlord, Tenant will
subordinate its rights pursuant to this Lease in writing (a) to the lien of any mortgage,
deed of trust or the interest of any lease in which Landlord is the lessee (or, at
Landlord's option, cause the lien of said mortgage, deed of trust or the interest of any
191695.1 18
"
lease in which Landlord is the lessee to be subordinated to this Lease), (b) to any
covenants, conditions, restrictions, easements, ground leases, mortgages or deeds of
trust affecting the Premises (collectively, "Agreements"), (c) upon any building hereafter
placed upon the land of which the Premises are a part, and (d) to all advances made or
hereafter to be made upon the security thereof.
31.2 Attornment. In the event any proceedings are brought for foreclosure, or
in the event of the exercise of the power of sale under any mortgage or deed of trust
made by Landlord encumbering the Premises, or should a lease in which Landlord is
the lessee be terminated, Tenant shall attorn to the purchaser or lessor under such
lease upon any foreclosure, sale or lease termination and recognize the purchaser or
lessor as Landlord under this Lease, provided that the purchaser or lessor shall acquire
and accept the Premises subject to this Lease.
31.3 Estoppal Certificate. Tenant agrees, upon not less than ten (10) days
prior notice by Landlord, to execute, acknowledge and deliver to Landlord, a statement
in writing in such form as may be required by Landlord or Landlord's mortgagee or
beneficiary ("Tenant's Certificate"). It is intended that any Tenant's Certificate delivered
pursuant hereto may be relied upon by Landlord, any prospective tenant of the
Premises, any current or prospective mortgagee or beneficiary, or by any other party
who may reasonably rely on such statement. At Landlord's option, the failure to deliver
such Tenant's Certificate within such time shall be a default under this Lease by Tenant,
and it shall be conclusively presumed, and shall constitute a representation and
warranty by Tenant, that (i) this Lease is in full force and effect without modification, and
(ii) Landlord is not in breach or default of any of its obligations under the Lease.
32. Complete Agreement and Amendment.
32.1 This Lease and exhibits attached hereto constitute the entire agreement
between the Landlord and Tenant with respect to the Premises. Any other agreements,
promises and representations with respect thereto, other than those contained herein,
are expressly revoked.
32.2 This Lease may only be modified in the form of a written amendment
signed by authorized representatives of both parties.
33. Time of the Essence.
33.1. Time is of the essence in the performance of Tenant's obligations under
this Lease.
34. Severability and Applicable Law.
34.1 Whenever possible, each provision of this Lease shall be interpreted in
such a manner as to be effective and valid under applicable law, but if any provision of
this Lease shall be invalid under the applicable law, such provision shall be ineffective
191695.1 19
only to the extent of such prohibition or invalidity, without invalidating the reminder of
that provision, or the remaining provisions of this Lease.
34.2 This Lease has been made and entered into in the State of California and
the laws of this State shall govern its validity and interpretation in the performance
hereunder by the parties.
35. Counterparts.
35.1 This Lease may be executed in counterparts, each of which shall be
deemed an original, but all of which together shall constitute one and the same
instrument.
IN WITNESS WHEREOF, the parties hereto have subscribed their signatures on
this _ day of , 2004.
APPROVED AS TO FORM
Thomas L. Woodruff
General Counsel
191695.1
ORANGE COUNTY SANITATION DISTRICT
Chairman, Board of Directors
Board Secretary
NAUTICAL ENTERPRISES, INC., dba H & S
YACHT SALES
Michael Berk, President
20
·'
OFFICE LEASE AGREEMENT
BETWEEN
ORANGE COUNTY SANITATION DISTRICT
AND
JOHN R. FINNELL
This Lease Agreement ("Agreement" or "Lease") is entered into this 1st day of
September, 2004 ("Effective Date") by and between ORANGE COUNTY
SANITATION DISTRICT ("OCSD" or "Landlord") and JOHN R. FINNELL ("Tenant").
RECITALS
A. Landlord is a single purpose government entity created pursuant to the County
Sanitation District Act of 1923, is a political subdivision of the State of California, and
provides wastewater treatment for portions of Orange County, California, including
Newport Beach.
B. Landlord is the owner of certain real property located in the City of Newport
Beach, County of Orange, State of California, including the real property and the
buildings and other improvements located thereon, commonly known as 1730 West
Coast Highway, (the "Property").
C. Landlord purchased the Property from International Bay Club, International,
Inc. on or about September 1, 2004, as part of a plan to replace the existing Rocky
Point Pump Station.
D. Landlord desires to construct a new pump station and associated structures
on or near the Property, beginning approximately on or about June 2006.
E. Landlord and Tenant acknowledge that construction of the desired pump
station and associated structures will require the demolition and destruction of some
or all of the existing structures on the Property and the current use of the Property to
cease.
F. Tenant currently occupies One Ground Floor Office in a building upon the
Property on a month-to-month basis pursuant to the "Holdover" terms of a written
lease agreement with the Property's prior owners, which lease has expired.
G. Landlord desires to lease to Tenant and Tenant desires to lease from
Landlord, the Premises, upon the terms and conditions set forth herein.
NOW THEREFORE, the parties hereto agree as follows:
191834.1 1
I
AGREEMENT
1. Premises.
1.1 Landlord hereby leases to Tenant and Tenant hereby leases from
Landlord, One Ground Floor Office located at 1730 West Coast Highway, Newport
Beach, CA 92663 ("Premises"), upon the terms and conditions set forth in this
Agreement.
1.2 Tenant has inspected and accepts the Premises "As Is" and in its
present condition and makes no demand on Landlord for any improvements or
alteration thereof.
1.3 The title to the Premises and any improvements thereon, present or
future, shall remain in Landlord or Landlord's successor or assignee. Tenant agrees
never to assail, contest, or resist said title.
1.4 In conjunction with Tenant's lease of the Premises, Tenant shall be
entitled to use of the parking spaces on the Property for the parking of Tenant's and
its customers' and guests' motor vehicles, but only the extent such parking is
necessary to and in furtherance of Tenant's business. Tenant shall not use any
parking spaces on the Property for the storage of or advertising for sale of motor
vehicles.
2. Term.
2.1 The term of this Lease shall be month-to-month, commencing
September 1, 2004, and continuing until terminated by mutual written agreement of
the parties or as provided in Paragraph 24.
2.2 Possession of the Premises, including all structures, buildings, and/or
improvements thereon, shall be surrendered to Landlord immediately upon expiration
or termination of this Lease.
3. Rent.
3.1 Tenant shall pay to Landlord a monthly rent of two hundred fifty dollars
($250.00). Rent for the first month of the Lease will be prepaid on or before
September 1, 2004. Subsequent rent shall be payable monthly, in advance, on the
first day of each month.
3.2 Rent shall be payable at the Landlord's office at P.O. Box 8127,
Fountain Valley, CA 92728, or at such other place or places as Landlord from time to
time may designate by notice provided pursuant to Paragraph 22 herein.
191834.1 2
·'
3.3 Rent and other sums due Landlord under this Lease shall be due as
specified in this Lease and shall bear interest at the rate of five percent (5.0%) per
annum until paid, if not paid within ten (10) calendar days after the date on which the
payment is due. In no event, however, shall any such interest charges exceed the
maximum amount permitted by law.
4. Late Charges.
4.1 Tenant acknowledges that late payment of rent or other sums due will
cause Landlord to incur costs, the exact amount of which will be difficult to ascertain.
Accordingly, if any installment of rent or any other sum due from the Tenant is not
received by Landlord within ten (10) days of the date on which it is due, Tenant shall
pay to Landlord, in addition to principal and interest plus any other amounts owing,
the lesser of the maximum amount allowed by law or ten percent ( 10%) of such
overdue amount. In addition, Tenant shall pay Landlord any attorneys' fees or
notice/process service fees incurred by Landlord by reason of Tenant's failure to pay
rent or other charges when due hereunder. In addition, all unpaid amounts shall
accrue interest at the lesser of the maximum rate allowed by law or 5% per annum
until paid.
5. Security Deposit
5.1 Concurrently with Tenant's execution of this Lease, Tenant shall
deposit with Landlord a security deposit in the amount of two hundred fifty dollars
($250.00). Tenant's security deposit shall be held by Landlord as security for the
faithful performance by Tenant of all the terms of this Lease. If Tenant defaults with
respect to any provision of this Lease, Landlord may (but shall not be required to do
so) without prejudice to any other remedy, use, apply or retain all or any part of the
security deposit for the payment of any sum in default, or for any amount which
Landlord may become obligated to spend by reason of Tenant's default, or for any
other loss or damage which Landlord may suffer by reason of Tenant's default. If any
portion of the security deposit is so used or applied, Tenant shall, within five (5) days
after written demand, deposit cash with Landlord sufficient to restore the security
deposit to its original amount. Landlord shall not be required to keep the security
deposit separate from its general funds, and Tenant shall not be entitled to interest
on such deposit. If Tenant fully performs every provision of this Lease, the security
deposit or any balance thereof shall be returned to Tenant within thirty (30) days
following expiration of the Lease.
6. Taxes and Assessments.
6.1 Landlord shall pay all real property taxes and assessments all which
may be levied by the State, County, or any other tax or assessment-levying body
upon the Premises and any improvements located thereon.
191834.1 3
6.2 Tenant shall pay, before delinquency, all taxes, assessments, fees, and
charges on personal property, goods, merchandise, fixtures, appliances, and
equipment used on the Premises.
7. Utilities.
7.1 Tenant shall be responsible for providing any and all utilities, including,
but not limited to, all water, gas, heat, light, power, telephone, and other utility
services, required by Tenant during the term of this Lease, together with any taxes
thereon and for all connection charges. If any such services are not separately
metered to Tenant, the Tenant shall pay a reasonable proportion, to be determined
by Landlord, of all charges jointly metered with other premises.
8. Permitted Uses of Premises.
8.1 Generally. The Premises shall be used by Tenant exclusively for
business purposes. Notwithstanding the foregoing, Tenant shall not cause or permit
the Premises to be used in any way which (i) constitutes a violation of any law,
ordinance, or governmental regulation or order regulating the manner of use by
Tenant of the Premises (including, without limitation, any law ordinance, regulation or
order relating to Hazardous Materials), (ii) constitutes a nuisance or waste, or (iii)
increases the cost of any insurance relating to the Premises paid by Landlord.
Tenant shall obtain, at its sole cost and expense, all governmental permits, licenses
and authorizations of whatever nature required by any governmental agencies having
jurisdiction over Tenant's use of the Premises. Further, Tenant, at its sole cost, will
comply with all applicable governmental laws and regulations in connection with its
operations within the City of Newport Beach. Tenant will also comply with any and all
reasonable rules and regulations promulgated by Landlord. The Premises shall be
used solely for the use described in this Section 8 and for no other use or purpose.
No signage shall be installed on the Premises or within the City of Newport Beach
without receipt of the prior written approval of Landlord.
8.2 Hazardous Materials. As used in this Lease, the term "Hazardous
Materials" means any flammable items, explosives, radioactive materials, hazardous
or toxic substances, material or waste or related materials, including any substances
defined as or included in the definition of "hazardous substances", "hazardous
wastes", "hazardous materials" or "toxic substances" now or subsequently regulated
under any applicable federal, state or local laws or regulations, including without
limitation petroleum-based products, paints, solvents, lead, cyanide, DDT, printing
inks, acids, pesticides, ammonia compounds and other chemical products, asbestos,
PCBs and similar compounds, and including any different products and materials
which are subsequently found to have adverse effects on the environment or the
health and safety of persons. Tenant shall not cause or permit any Hazardous
Materials to be generated, produced, brought upon, used, stored, treated or disposed
of in or about the Premises by Tenant, its agents, employees, contractors,
191834.1 4
sublessees or invitees in violation of any applicable laws, codes, ordinances or
regulations governing the same.
9. Tenant Improvements.
9.1 Except as may exist on the Property and Premises as of the Execution
Date, no structure, sign or other improvement of any kind shall be constructed on the
Property or Premises by Tenant, its employees, agents or contractors without the
prior written approval of Landlord in each case. Approval may be withheld,
conditioned or delayed in Landlord's sole and absolute discretion. No changes,
modifications or alterations from approved plans and specifications may be made
without Landlord's prior written approval. No approval by Landlord of any plans or
specifications shall constitute (i) approval of architectural or engineering sufficiency or
representation, or (ii) warranty by Landlord as to the adequacy or sufficiency of the
plans and specifications or the improvements contemplated for Tenant's use or
purpose. Landlord, by approving the plans and specifications, assumes no
responsibility or liability for any defect in any improvements constructed on the basis
of the plans and specifications. Tenant expressly agrees to comply with all
applicable signage ordinances.
9.2 Tenant shall permit Landlord to inspect the Premises during
construction of the Improvements.
9.3 Except as otherwise provided in this Lease, ownership of all
Improvements on the Premises shall immediately vest and remain vested in
Landlord, without compensation being paid therefore by Landlord.
9.4 Tenant shall construct, perform, complete, and maintain all
Improvements in a good and workmanlike manner and with high quality materials,
and shall furnish all tools, equipment, labor, and material necessary to perform and
complete the same.
9.5 Upon termination of this Lease, Tenant shall assign to Landlord all
express warranties furnished by other persons and remaining in effect in connection
with the construction and installation of the Improvements.
10. Maintenance and Repairs.
10.1 Tenant shall, at its sole cost and expense during the term of this Lease,
keep and maintain the Premises and all Improvements, fixtures, and equipment
thereon, in good, operable, usable, and sanitary order and repair, and in a good,
safe, and first-class condition, providing for such repairs, replacements, rebuilding,
and restoration as may be required by Landlord to comply with the requirements of
this Lease. Tenant shall furnish all necessary equipment, supplies, and material of
good quality and in sufficient quantity to fulfill the requirements of this Lease and to
maintain an acceptable and professional level of maintenance. Any replacements,
191834.1 5
rebuilding, restoration and/or modifications or additions to the Premises shall have
the prior written approval of Landlord.
10.2 Tenant shall, at its sole cost and expense during the term of this Lease,
keep the Premises and surrounding Property free and clear of rubbish and litter and
shall deposit rubbish and litter in designated trash containers. No offensive matter or
refuse or substance constituting an unnecessary, unreasonable, or unlawful fire
hazard, or material detrimental to the public health shall be permitted to remain on
the Premises and Tenant shall prevent any accumulation thereof from occurring.
10.3 All work performed under this Paragraph 10 shall be performed in
accordance with the highest industry-wide standards at a frequency sufficient to
maintain the first-class condition of the Premises.
10.4 Landlord has the right to conduct regularly scheduled maintenance
inspections of the Premises.
10.5 Tenant shall provide Landlord with the names and telephone numbers
of at least two (2) qualified persons who can be contacted by Landlord's
representatives if an emergency maintenance or repair condition occurs during the
hours when Tenant's normal work force is not present. Landlord shall call for such
assistance only in the event of a genuine and substantial emergency.
11. Capital Repairs and Improvements.
11.1 Tenant acknowledges and agrees that as the prior lessee of the
Premises it has substantial knowledge as to the condition of the Premises and that it
is Landlord's intent to demolish the existing structures and construct a pump station
on the Property after the surrender of the Premises by Tenant. As such, should the
need for capital repairs or improvements to the Premises arise during the original
Lease Term {including, without limitation {i) improvement or repair of the structural
components of any improvements on the Premises [including, the exterior walls,
foundation, slab and structural columns and all components of the roof], {ii)
improvement, repair or replacement of any plumbing, electric, fire sprinkler, lighting,
HVAC, mechanical and sewer systems in or servicing any improvements on the
Premises, or {iii) any retrofits, upgrades, replacements and the like), such repairs or
improvements shall be completed by Tenant itself, at Tenant's sole and exclusive
cost, in good workmanlike manner, and only to the extent necessary for the
occupancy of the Premises by Tenant for the duration of the Term. Tenant hereby
waives its rights to compel Landlord to repair, replace, upgrade or otherwise maintain
the Premises.
11.2 The provisions of Section 9, above, regarding Tenant Improvements
shall also be applicable to all Capital Repairs and Improvements made under this
Section 11.
191834.1 6
12. Operating Responsibilities.
12.1 Tenant shall operate, maintain, manage and keep the Premises in good
repair.
12.2 Tenant shall conform to abide by all applicable City and County
Ordinances and all State and Federal laws and regulations and shall obtain all
required permits and licenses necessary for the operation of its facilities.
12.3 Tenant shall exercise every reasonable effort to prevent loud,
boisterous, or disorderly person from loitering about the Premises.
12.4 Tenant shall not knowingly permit any illegal activities to be conducted
upon the Premises.
12.5 Tenant may, at its own expense, place signs upon the Premises subject
to the prior written approval of Landlord. The placement of such signs shall comply
with applicable law. All signage placed upon the Premises by Tenant shall remain
the Tenant's property and shall be removed by Tenant upon termination or expiration
of this Lease at Tenant's expense. Any damage caused by such removal shall be
repaired at Tenant's expense.
12.6 Tenant shall maintain an adequate and proper staff. Landlord may at
any time give Tenant written notice of noncompliance with this Lease. Tenant shall
take all reasonable measures to ensure that the conduct and activities of Tenant's
employees shall not be detrimental to the interest of the public.
12.7 Tenant may provide any legal devices, mechanisms, or equipment
designed for the purpose of protecting the Premises from theft, burglary, or
vandalism, provided that installation thereof does not adversely affect Landlord's use
of the Property. All such purchases and installations shall be at Tenant's sole
expense. Upon Landlord's request, prior to the expiration or termination of this
Lease, Tenant shall remove same from the Premises, except for those items which
have been so affixed that their removal cannot be accomplished without damage to
the Premises.
12.8 Tenant, at its sole cost and expense, shall provide and install any
appliances, furniture, fixtures, equipment, padlocks, or personal property required for
the operation of the Premises. Upon Landlord's request, prior to the expiration of
termination of this Lease, Tenant shall remove same from the Premises, except for
those items which have been so affixed that their removal cannot be accomplished
without damage to the Premises. Should Tenant fail to remove same within the
required thirty (30) day period, Tenant shall lose all right, title, and interest therein,
and Landlord may elect to keep same upon the Premises or to sell, remove, or
demolish same. Tenant shall reimburse Landlord for any cost incurred in the removal
191834.1 7
or demolition thereof, in excess of any consideration received from any sale of such
equipment.
12.9 Tenant shall immediately correct any unsafe condition on the Premises,
as well as any unsafe practices occurring thereon. Tenant shall cooperate fully with
Landlord in the investigation of any injury or death occurring on the Premises,
including a prompt report thereof to Landlord.
12.10 Tenant shall not use or permit the use of the Premises in any manner
which creates a nuisance or a measurable annoyance to persons outside the
Premises, including, without limitation, live, recorded, or broadcasted entertainment
or the use of loud speakers or sound or light apparatus other than as may be
required by law or be necessary or advisable for safety purposes.
12.11 Tenant agrees to allow inspection of the Premises, at all reasonable
times, by Landlord, State officials, County officials, and fire officials.
12.12 Tenant shall construct, operate and maintain its facilities in a manner
which does not cause damage to Landlord's facilities on the Property or interfere with
the operation, maintenance and repair by Landlord of such facilities.
13. Insurance.
13.1 Tenant shall provide and maintain at its own expense during the term of
this Lease the following insurance covering its operations and activities under this
Lease. Such insurance shall be provided with insurers licensed to do business in the
State of California, with a rating of at least "A-VIII," according to the latest Best's Key
Rating Guide. Evidence of such insurance shall be delivered to Landlord on or
before the effective date of this Lease on Landlord's own form. The Certificate of
Insurance shall specifically identify this Lease and shall contain express conditions
that Landlord is to be given at least thirty (30) days advance written notice by the
insurer, of any material modification in or termination of insurance. Such insurance,
shall be primary to and not contributing with any other insurance maintained by
Landlord, and shall name the Landlord, and its officers, agents and employees as
additional insureds. All insurance shall be on an occurrence basis and shall meet the
following requirements:
13.1.1 General Liability Insurance. Comprehensive general liability
insurance covering the Premises, and Tenant's operations and activities on the
Premises in contractual, broad form property damage, and personal injury, with a
combined single limit of not less than one million dollars ($1,000,000.00) per
occurrence.
13.1.2 Workers Compensation Insurance. Workers compensation
insurance in an amount and form meeting all applicable requirements of the
191834.1 8
·I
California Labor Code, covering all persons providing services by or on behalf of
Tenant and all risks to such persons.
13.1.3 Fire and Extended Coverage Insurance. A standard form all-risk
policy for the actual cash value covering fire and extended coverage, theft, burglary,
vandalism, malicious mischief, sprinkler leakage and other perils of direct physical
loss or damage insuring the personal property, trade fixtures, equipment, and
improvements of Tenant.
13.2 Failure by Tenant to procure or maintain required insurance shall
constitute an event of default, upon which Landlord may immediately terminate this
Lease. Tenant's operations shall be subject to suspension by Landlord during any
period Tenant fails to maintain required insurance in full force and effect.
13.3 Risk of Loss. Landlord shall not be liable for any injury to Tenant's
business or loss of income therefrom or for injury to any person or for any damage to
personal property, good, wares, or merchandise sustained by Tenant or others that
are caused by any defects in said Premises, or any service facilities or due to the
happening of accident, including any damage caused by water, wind storm, or by any
gas, steam, electrical wiring, sprinkler system, plumbing, heating or conditioning
apparatus; or acts or omissions of co-tenants or other occupants of the Premises, or
hereafter occurring therein or due to any part or appurtenance thereof, including any
and all furniture, fixtures, and equipment of Tenant becoming out of repair, or from
any act or omission of Tenant.
13.4 Waiver of Subrogation. Tenant hereby releases Landlord from liability
and waives all right of recovery against Landlord for any loss in or about the
Premises from perils insured against under its fire, property, or liability insurance
contracts, including any all risk endorsements thereof, whether due to negligence or
any other cause, provided that this Section shall be inapplicable if it would have the
effect, but only to the extent it would have the effect, of invalidating any insurance
coverage of Landlord or Tenant. Nothing herein shall relieve Tenant of its obligation
to request and procure, to the extent available on a commercially reasonable basis,
the necessary endorsements required to validly waive subrogation in accordance
with this paragraph. Tenant shall, at the request of Landlord, execute and deliver to
Landlord a Waiver of Subrogation in the form and content as reasonably required by
Landlord's insurance carrier. To the extent Tenant fails to maintain the insurance
required under the terms of this Lease, such failure shall be a defense to any claim
asserted by Tenant against Landlord by reason of any loss sustained by Tenant due
to circumstances that would have been covered had such required insurance been
maintained.
13.5. Landlord's Substitute Performance. If Tenant fails to procure, maintain
and pay for, at the times and for the durations specified in this Lease, any insurance
required by this Lease or fails to carry insurance required by law or governmental
regulation, Landlord, at any time or from time to time and without notice, may, at its
191834.1 9
option, procure such insurance and pay the premiums therefore, in which event
Tenant shall repay all sums so paid by Landlord, together with interest thereon as
provided in the Lease, and any costs or expenses incurred by Landlord in connection
therewith within ten (10) days following Landlord's written demand to Tenant for such
payment.
14. Destruction of Premises.
14.1 In the event the Premises shall be totally or partially destroyed by a risk
covered by insurance required by this Lease, Landlord shall be entitled to make the
loss adjustment with the insurance company insuring the loss and receive payment of
the proceeds of insurance.
14.2 If the damage to the Premises cannot lawfully and reasonably be
repaired within ten (10) days after the date of damage, this Lease may be terminated
by written notice of either party. If the Premises can reasonably be repaired within
the ten (10) day period, or if this Lease is not terminated in accordance with this
provision, Tenant may opt to restore the Premises. In the event Tenant chooses to
restore the Premises, said insurance proceeds, if any, shall be held by Landlord for
the benefit of Tenant and shall be disbursed in installments as construction
progresses for payment of the costs of restoration or reconstruction, upon
satisfactory performance of the work required, and release of mechanics liens by all
persons furnishing labor and materials thereon. If the insurance proceeds are
insufficient to pay the actual costs of restoration or reconstruction, Tenant shall
deposit the amount of the deficiency with Landlord upon demand therefore by
Landlord, and said sums shall be held for payment of said costs and disbursed in the
manner heretofore provided.
14.3 If Tenant elects to restore the Premises, written plans, specifications,
and construction cost estimates for the restoration shall be prepared by Tenant and
forwarded to Landlord for approval prior to the performance of any work. Said
documents shall be prepared and submitted in a timely manner following adjustment
of the loss and receipt of the proceeds of insurance by Landlord. The required
construction shall be performed by Tenant and/or licensed and bonded contractor(s),
who shall be required to carry comprehensive liability and property damage
insurance, workers compensation insurance, and standard fire and extended
coverage insurance, with vandalism and malicious mischief endorsements, during the
period of construction, in amounts equal to insurance limits required herein, or in
greater amounts if otherwise reasonably required by Landlord. Said construction
shall be commenced promptly following approval by Landlord, the issuance of
applicable permits and posting of the construction site by Landlord with notice of non-
responsibility, and shall be diligently prosecuted to completion. All work shall be
performed in accordance with the approved plans and specifications, unless changes
are approved in writing, in advance, by Landlord. Tenant agrees that Landlord may
have on the site at any time during the construction period, an inspector who shall
have the right to access the Premises and the work occurring thereon. Tenant, at the
191834.1 10
commencement of the construction work, shall notify Landlord in writing of the
identity, place of business, and telephone number or responsible person(s) in charge
of construction. Tenant shall ensure that all construction shall be performed in a
good and workmanlike manner. Upon completion of the restoration, Tenant shall
immediately record a notice of completion with the Orange County Recorder.
14.4 In the event the Premises shall be totally or partially destroyed by a risk
for which insurance coverage is not required or provided herein, Landlord, in its sole
discretion, may either restore Premises or terminate this Lease by providing notice to
Tenant pursuant to Paragraph 22 herein.
14.5 If Tenant elects not to restore the Premises, the insurance proceeds
shall be first used to demolish and clear the Premises. Thereafter, following
Landlord's compensation for any amounts remaining owing to Landlord pursuant to
this Lease, Tenant shall be entitled to the remainder of the insurance proceeds.
14.6 Under no circumstances shall Landlord have any obligation to restore
or reconstruct the Premises.
15. Reconstruction by Tenant Affe.cting Premises.
15.1 In the event Tenant elects to repair or reconstruct the Premises
pursuant to Section 14, this Lease shall continue in full force and effect
15.2 Tenant agrees to accept the remedy provided in this Lease in the event
of destruction or damage to the Premises, and hereby waives any and all additional
rights and remedies for relief or compensation that may presently be available or may
hereafter be made available against Landlord under the laws and statutes of this
State.
16. Condemnation.
16.1 If all or any portion of the Premises are condemned, transferred in lieu
of condemnation, taken by the power of eminent domain, or sold by Landlord under
threat of exercise of said power, Landlord or Tenant may, upon written notice given
within thirty (30) days after the taking or transfer, terminate this Lease.
16.2 Tenant shall not be entitled to share in any portion of the award, and
Tenant expressly waives any right or claims to any part of the award. Tenant shall,
however, have the right to claim and recover, from the condemning authority only, but
not from Landlord, any amounts necessary to reimburse Tenant for the cost of
removing stock and fixtures.
16.3 Each party hereby waives the provisions of California Code of Civil
Procedure 1265 .130 allowing either party to petition the Superior Court to terminate
this Lease in the event of a partial taking of the premises.
191834.1 11
17. Liens.
17 .1 Tenant shall not permit to be placed against the Premises, or any part
of the Premises, any mechanics', materialmen's, contractors', subcontractors' or
other liens. Tenant shall indemnify, defend (with counsel acceptable to Landlord)
and hold Landlord harmless from all liability for any and all liens, claims and
demands, together with the costs of defense and reasonable attorneys' fees related
to same. Landlord reserves the right, at any time and from time to time, to post and
maintain on the Premises, any portion thereof or on the improvements on the
Premises any notices of nonresponsibility or other notice as may be desirable to
protect Landlord against liability. In addition to and not in limitation of Landlord's
other rights and remedies under this Lease, should Tenant fail, within ten (10) days of
a written request from Landlord, to discharge any lien or claim related to Tenant's use
of the Premises, or to indemnify, hold harmless and defend Landlord from and
against any loss, damage, injury, liability or claim arising out of Tenant's use of the
Premises as provided herein, then Landlord, at its option, may elect to pay any lien,
claim, loss, demand, injury, liability or damages, or settle or discharge any action or
satisfy any judgment and all costs, expenses and attorneys' fees incurred in doing so
shall be paid to Landlord by Tenant upon written demand, together with interest
thereon at the rate of seven percent (7%) per annum (but in no event more than the
maximum interest rate permitted by law} from the date incurred or paid through and
including the date of payment.
18. Assignment, Sublease, and Encumbrance.
18.1 Tenant shall not voluntarily assign, hypothecate, mortgage or encumber
its interest in the Lease or in the Premises, or sublease or license the use of any part
of the Premises, or allow any other person or entity, except Tenant's authorized
representatives, to occupy or use any part of the Premises without the prior written
consent of Landlord. Landlord may in its sole discretion withhold such consent.
18.2 Any attempted assignment, hypothecation, mortgage, sublease, or
license of the Premises without the prior written consent of the Landlord shall render
this Lease null and void.
18.3 Landlord may assign any or all of its interest in this Lease at any time.
18.4 Each and all of the provisions, agreements, terms, covenants, and
conditions contained in this Lease shall be binding upon any transferee hereof or any
interest herein.
19. Entrv.
19.1 Landlord shall have the right to enter the Premises at all times to
access its facilities.
191834.1 12
23.1.2 Tenant's failure to operate in the manner required by this Lease,
where such failure continues for more than ten (10) days following receipt of written
notice from Landlord to correct the condition therein specified.
23.1.3 Tenant's failure to maintain the Premises and Improvements in
the state of repair required under this Lease, and in a clean, sanitary, safe, and
satisfactory condition, where such failure continues for more than ten (10) days
following receipt of written notice from Landlord to correct the conditions therein
specified. Where fulfillment of said maintenance obligation requires activity over a
period of time and Tenant shall have immediately, following receipt of notice,
commenced whatever action may be required to cure the particular default and
continued such performance diligently, said time may be waived in writing in the
manner and to the extent determined by Landlord. In the event Tenant fails to
correct any maintenance or repair deficiency within the prescribed time, Landlord
may, at its option, exercise its rights of entry and repair under Paragraph 19.4 and/or
terminate this Lease as provided in Paragraph 24.
23.1.4 Tenant's failure to keep, perform, and observe any other
promises, covenants, conditions, and agreements set forth in this Lease, where such
failure continues for more than ten (10) days after receipt of written notice from
Landlord to correct the condition therein specified. Where fulfillment of any
maintenance or repair obligation requires activity over a period of time and Tenant
shall have immediately, following receipt of notice, commenced whatever may be
required to cure the particular default and continued such performance diligently, said
time may be waived in writing in the manner and to the extent determined by
Landlord.
23.1.5 The filing of a voluntary petition in bankruptcy by Tenant; the
adjudication of Tenant as a bankrupt; the appointment of a receiver or trustee of
Tenant's assets; the making of a general assignment for the benefit of creditors; a
petition or answer seeking reorganization of Tenant under any Federal reorganization
act; the occurrence of any act which operates to deprive Tenant permanently of the
rights, powers, and privileges necessary for the proper conduct of its operations
under this Lease; the levy of any attachment or execution which substantially
interferes with Tenant's operations under this Lease and which is not vacated,
dismisses, stayed, or set aside within a period of sixty (60) days; or a reasonable
determination by Landlord that Tenant is insolvent.
23.1.6 The failure to submit written plans for the Improvements on or
before the times designated in this Lease for submission thereof.
23.1. 7 Tenant's failure to procure or maintain required insurance as
provided in Paragraph 13.
191834.1 15
24. Termination of Lease.
24.1 Upon the occurrence of any one or more events of default, Landlord
shall give Tenant ten (10) days written notice, pursuant to Section 22 herein, of the
condition of default. The notice shall also inform Tenant that if the default is not
corrected within the time specified in the notice, this Lease shall be subject to
termination. Should Tenant fail to correct the default within the time specified in the
notice, Landlord may give Tenant written notice of the termination of the Lease,
which shall become effective immediately.
24.2 Upon termination pursuant to Section 24.1, Landlord shall have the
right to take possession of the Premises, including all improvements, equipment, and
inventory located thereon and use same for the purpose of satisfying and or
mitigating all damages arising from termination.
24.3 Action by Landlord to effectuate a termination and forfeiture of
possession shall be without prejudice to its exercise of any other rights provided
herein or by law to remedy a breach of this Lease.
24.4 This Lease is revocable at will by either party, and either party may
terminate this Lease for any reason upon thirty (30) days written notice, pursuant to
Section 22 herein.
25. Surrender.
25.1 Upon expiration or termination of this Lease, Tenant shall peaceably
vacate the Premises and shall remove all Improvements, equipment, inventory, and
personalty, unless otherwise mutually agreed, in writing, by the parties. Title to the
Premises and Improvements shall remain vested in Landlord.
25.2 Upon expiration or termination of this Lease, Tenant shall, at Landlord's
request, execute and deliver to Landlord within thirty (30) days after service of written
demand, a good and sufficient quitclaim deed of Tenant's interest in this Lease and
the Premises. Should Tenant fail or refuse to deliver to Landlord such quitclaim
deed, written notice by Landlord reciting the failure of Tenant to execute and deliver
the quitclaim deed, shall, after ten (10) days from the date or recordation of the
notice, be conclusive evidence against Tenant and all other person claiming under
Tenant, of the termination of this Lease.
26. No Relocation Benefits or Loss of Goodwill.
26.1 Tenant expressly waives any and all relocation assistance, relocation
benefits, or compensation for loss of goodwill, known or unknown, to which it is or
might be entitled upon the termination of the terms of this Lease, including the
provisions of California Civil Code Section 1542. In no event will Landlord be
obligated to pay any costs or charges related to costs, expenses, damages, or other
191834.1 16
charges Tenant might incur as a result of its move to or from the Premises, securing
new facilities, or maintaining customer relations.
27. Landlord-Tenant Relationship.
27 .1 This Lease is not intended and shall not be construed to create the
relationship of agent, servant, employee, or representative of the Landlord by Tenant.
27.2 Tenant understands and agrees that all persons furnishing services to
Tenant pursuant to this Lease are, for purposes of workers compensation and
liability, solely employees of the Tenant and not of Landlord.
27.3 Tenant shall bear the sole responsibility and liability for furnishing
workers compensation benefits to any person for injuries from or connected with
services performed on behalf of Tenant pursuant to this Lease.
27 .4 Tenant understands and specifically agrees to inform its employees that
Tenant is a tenant of Landlord. Tenant understands and specifically agrees to inform
its employees that Tenant is not an agent, servant, employee, or representative of
Landlord.
27.5 Tenant understands and specifically agrees to inform its employees that
they are not agents, servants, employees, or representatives of Landlord.
28. Indemnity.
28.1 Tenant, as a material part of the consideration to be rendered to
Landlord, hereby agrees that it will defend (with counsel acceptable to Landlord),
indemnify, and hold harmless Landlord and all of its officers, employees, agents, and
independent contractors thereof from any loss, damage, injury, accident, casualty,
liability, claim, cost or expense (including, but not limited to, reasonable attorneys'
fees) of any kind or character to any person or property (collectively, "Claims") arising
from or related to Tenant's use of the premises, the conduct of Tenant's business,
and/or any act or omission of Tenant, its employees, agents, contractors, or invitees.
Tenant shall not be liable for such Claims to the extent and in the proportion that the
same is ultimately determined to be attributable to the sole gross negligence or
intentional misconduct of Landlord.
28.2 Tenant hereby assumes all risk of damage to property or injury to
person in or about the Premises from any cause, and Tenant hereby waives all
claims in respect thereof against Landlord.
28.3 All indemnity obligations under this Section shall survive the expiration
or termination of the Lease.
191834.1 17
28.4. Landlord shall not be liable for any loss or theft of any property on the
Premises.
29. Attorney Fees.
29.1 Should either party to this Lease commence an action against the other
party arising out of or in connection with this Lease, the prevailing party shall be
entitled to its attorneys' fees and reasonable costs incurred in litigating any dispute.
30. Waiver.
30.1 Any waiver by Landlord of any default or breach of any covenant,
condition, term, and agreement contained in this Lease, shall not be construed to be
a waiver of any subsequent or other default or breach, nor shall failure by Landlord to
require exact, full, and complete compliance with any of the covenants, conditions,
terms, or agreements contained in this Lease be construed as changing the terms of
this Lease in any manner or preventing Landlord from enforcing the full provisions
hereof.
30.2 No delay, failure, omission of Landlord to exercise any right, power,
privilege, or option arising from any default or breach, nor any subsequent
acceptance of payment then or thereafter by Landlord, shall impair any such right,
power, privilege, or option or be construed as a waiver of or acquiescence in such
default or breach, or as a relinquishment of any right.
30.3 The rights, powers, options, privileges, and remedies available to
Landlord under this Lease shall be cumulative.
31. Subordination, Attornment and Estoppel Certificate.
31.1 Subordination. Upon written request of Landlord, Landlord's
mortgagee, the beneficiary of a deed of trust of Landlord or a lessor of Landlord,
Tenant will subordinate its rights pursuant to this Lease in writing (a) to the lien of any
mortgage, deed of trust or the interest of any lease in which Landlord is the lessee
(or, at Landlord's option, cause the lien of said mortgage, deed of trust or the interest
of any lease in which Landlord is the lessee to be subordinated to this Lease), (b) to
any covenants, conditions, restrictions, easements, ground leases, mortgages or
deeds of trust affecting the Premises (collectively, "Agreements"), (c) upon any
building hereafter placed upon the land of which the Premises are a part, and (d) to
all advances made or hereafter to be made upon the security thereof.
31.2 Attornment. In the event any proceedings are brought for foreclosure,
or in the event of the exercise of the power of sale under any mortgage or deed of
trust made by Landlord encumbering the Premises, or should a lease in which
Landlord is the lessee be terminated, Tenant shall attorn to the purchaser or lessor
under such lease upon any foreclosure, sale or lease termination and recognize the
191834.1 18
purchaser or lessor as Landlord under this Lease, provided that the purchaser or
lessor shall acquire and accept the Premises subject to this Lease.
31.3 Estoppel Certificate. Tenant agrees, upon not less than ten (10) days
prior notice by Landlord, to execute, acknowledge and deliver to Landlord, a
statement in writing in such form as may be required by Landlord or Landlord's
mortgagee or beneficiary ("Tenant's Certificate"). It is intended that any Tenant's
Certificate delivered pursuant hereto may be relied upon by Landlord, any
prospective tenant of the Premises, any current or prospective mortgagee or
beneficiary, or by any other party who may reasonably rely on such statement. At
Landlord's option, the failure to deliver such Tenant's Certificate within such time
shall be a default under this Lease by Tenant, and it shall be conclusively presumed,
and shall constitute a representation and warranty by Tenant, that (i) this Lease is in
full force and effect without modification, and (ii) Landlord is not in breach or default
of any of its obligations under the Lease.
32. Complete Agreement and Amendment.
32.1 This Lease and exhibits attached hereto constitute the entire agreement
between the Landlord and Tenant with respect to the Premises. Any other
agreements, promises and representations with respect thereto, other than those
contained herein, are expressly revoked.
32.2 This Lease may only be modified in the form of a written amendment
signed by authorized representatives of both parties.
33. Time of the Essence.
33.1. Time is of the essence in the performance of Tenant's obligations under
this Lease.
34. Severability and Applicable Law.
34.1 Whenever possible, each provision of this Lease shall be interpreted in
such a manner as to be effective and valid under applicable law, but if any provision
of this Lease shall be invalid under the applicable law, such provision shall be
ineffective only to the extent of such prohibition or invalidity, without invalidating the
reminder of that provision, or the remaining provisions of this Lease.
34.2 This Lease has been made and entered into in the State of California
and the laws of this State shall govern its validity and interpretation in the
performance hereunder by the parties.
191834.1 19
35. Counterparts.
35.1 This Lease may be executed in counterparts, each of which shall be
deemed an original, but all of which together shall constitute one and the same
instrument.
IN WITNESS WHEREOF, the parties hereto have subscribed their signatures
on this _day of , 2004.
APPROVED AS TO FORM
Thomas L. Woodruff
General Counsel
191834.1
ORANGE COUNTY SANITATION DISTRICT
Chairman, Board of Directors
Board Secretary
John R. Finnell
20
r
GWRS Steering Committee
September 13, 2004
MINUTES
GROUNDWATER REPLENISHMENT SYSTEM
STEERING COMMITTEE
(A Committee of Orange County Water District*
And Orange County Sanitation District Directors)
OCWD Boardroom, 10500 Ellis Avenue, Fountain Valley
Monday, September 13, 2004, 5:30 p.m.
COMMITTEE MEMBERS
Anthony -Present
Cook -Not present
Kraemer -Present
McCracken -Present
Eckenrode -Present
Anderson -Present
ALTERNATE MEMBERS
Barr -Present
Franklin -Present
Chavez -Not present
Collins -Present
Duval -Present
Cavecche -Present
DIRECTORS IN ATTENDANCE
Bannister, Bilodeau, Debay
CONSENT CALENDAR (ITEM NO. 1)
1. MINUTES OF PREVIOUS MEETING
RECOMMENDATION: Approve Minutes of the
August 9, 2004 Groundwater Replenishment System
Steering Committee Meeting as mailed.
END OF CONSENT CALENDAR
MATTERS FOR CONSIDERATION
2. INTEGRATED INFORMATION SYSTEM-
REQUEST FOR PROPOSALS FOR
ENTERPRISE ASSET MANAGEMENT
SYSTEM SOFTWARE AND SUPPORT
SERVICES
RECOMMENDATION: Agendize for the September
15 OCWD Board meeting: Authorize the issuance of
a Request for Proposals (RFP) for the Enterprise
Asset Management System (EAMS) including both
the Computerized Maintenance Management System
(CMMS) software and basic installation and support
services.
-1 -
MOTIONNOTE
ANTHONY -AYE
BARR-AYE
KRAEMER -AYE
ECKENRODE -AYE
MCCRACKEN-MOTION
ANDERSON-SECOND
MOTIONNOTE
ANTHONY-AYE
BARR-AYE
KRAEMER -AYE
ECKENRODE -AYE
MCCRACKEN-MOTION
ANDERSON-SECOND
AGENCY
OCWD
OCSD
OCWD
ACTION TAKEN
COMMITIEE APPROVED
RECOMMENDATION
ACTION TAKEN
COMMITIEE APPROVED
RECOMMENDATION
MATTERS FOR CONSIDERATION
3. ISSUANCE OF A PROFESSIONAL
SERVICES AGREEMENT TO DIAZ
YOURMAN & ASSOCIATES FOR
GEOTECHNICAL SERVICES DURING PILE
TESTING AND CONSTRUCTION FOR THE
GROUNDWATER REPLENISHMENT
ADVANCED WATER PURIFICATION
FACILITY
RECOMMENDATION: Agendize for September 15
OCWD Board meeting: Authorize issuance of a
Professional Services Agreement to Diaz Yourman &
Associates in an amount not to exceed $85, 732 to
provide Geotechnical services during pile testing and
construction for the Groundwater Replenishment
Advanced Water Purification Facility.
4. ISSUANCE OF CHANGE ORDER NO. 5 TO
WOODRUFF, SPRADLIN & SMART TASK
ORDER FOR SPECIAL LEGAL SERVICES
RECOMMENDATION: Agendize for the September
15 OCWD Board meeting: Authorize issuance of
Change Order No. 5 in the amount of $5,000 to
Woodruff Spradlin & Smart Task Order No. 231067 to
continue providing legal services in the Pall v. OCWD
litigation, bringing the total Task Order in an amount
not to exceed $169,500.
5. RENEWAL OF PUBLIC INFORMATION &
EDUCATION TASK ORDER
RECOMMENDATION: Agendize for the September
15 OCWD Board meeting and October 27 OCSD
Board meeting: Approve and authorize issuance of a
one-year Professional Services Agreement to Porter
Novelli in the amount of $615,000 for the GWRS
Public Information and Education Program.
6. ISSUANCE OF A PROFESSIONAL SERVICE
AGREEMENT TO TOWNSEND PUBLIC
AFFAIRS, INC. FOR GRANT AND LOCAL
GOVERNMENT SUPPORT
RECOMMENDATION: Agendize for the September
15 OCWD Board meeting: Authorize issuance of a
one year Professional Service Agreement to
Townsend Public Affairs, Inc. in an amount not to
exceed $66,000 to continue to serve as a grant
support specialist for the GWR System and assisting
in local government issues that relate to the project.
-2-
GWRS Steering Committee
September 13, 2004
MOTIONNOTE ACTION TAKEN
ANTHONY -AYE COMMITTEE APPROVED
BARR-AYE RECOMMENDATION
KRAEMER -AYE
ECKENRODE -AYE
MCCRACKEN-MOTION
ANDERSON-SECOND
ANTHONY -AYE COMMITTEE APPROVED
BARR-AYE RECOMMENDATION
KRAEMER -AYE
ECKENRODE -AYE
MCCRACKEN-MOTION
ANDERSON-SECOND
ANTHONY-YES COMMITTEE APPROVED
BARR-YES RECOMMENDATION
KRAEMER-MOTION
ECKENRODE-ABSTAIN
MCCRACKEN-SECOND
ANDERSON-AYE
ANTHONY -AYE COMMITTEE APPROVED BARR-SECOND RECOMMENDATION KRAEMER -AYE
MCCRACKEN -AYE DIRECTOR ECKENRODE
ANDERSON-MOTION DEPARTED AND DIRECTOR
COLLINS -AYE COLLINS BECAME A
VOTING MEMBER.
ITEM WAS NOT BUDGETED.
MONIES MOVED FROM
PROGRAM CONTINGENCY.
'
MATTERS FOR CONSIDERATION
7. INSPECTION SERVICES FOR THE GWR
SYSTEM PROJECTS
RECOMMENDATION: Authorize use of OCWD's
on-call construction management consultant to
supply two inspectors on GWR System Projects with
the costs being shared between the two agencies.
INFORMATIONAL ITEMS
8. VISITOR CENTER WORKSHOP
9. ADVANCED WATER PURIFICATION
FACILITY COST SAVINGS UPDATE
10. PROJECT SCHEDULE AND BUDGET
UPDATE
11. CONSTRUCTION PROJECTS PROGRESS
• PROJECT PROGRESS PHOTOS
• OUTREACH
12. MONTHLY CHANGE ORDER UPDATE
13. STATUS REPORT
• Grants and Loans Update
• Public Information and Education Update
DIRECTORS' ANNOUNCEMENTS/ REPORTS
GENERAL MANAGERS' ANNOUNCEMENTS/
REPORTS
ADJOURNMENT
-3-
GWRS Steering Committee
September 13, 2004
MOTIONNOTE ACTION TAKEN
ANTHONY -AYE COMMITTEE APPROVED
BARR-AYE RECOMMENDATION
KRAEMER-SECOND BUTIER CONSTRUCTION MCCRACKEN -AYE MANAGERS IS THE FIRM ANDERSON-MOTION
COLLINS -AYE THE DISTRICT WILL BE
USING.
7:00 pm
MINUTES
SPECIAL WORKSHOP MEETING
GROUNDWATER REPLENISHMENT SYSTEM STEERING COMMITTEE
(A Committee of Orange County Water District*
and Orange County Sanitation District Directors)
Monday, September 27, 2004, 5:30 p.m.
WORKSHOP ITEM ACTION TAKEN
1. VISITOR CENTER WORKSHOP No formal action -staff to
continue to develop ideas
DIRECTORS' ANNOUNCEMENTS/REPORTS
GENERAL MANAGERS'
ANNOUNCEMENTS/REPORTS
ADJOURNMENT
-1 -
GWRS Steering Committee
October 11, 2004
MINUTES
GROUNDWATER REPLENISHMENT SYSTEM
STEERING COMMITTEE
(A Committee of Orange County Water District
and Orange County Sanitation District Directors)
OCWD Boardroom, 10500 Ellis Avenue, Fountain Valley
Monday, October 11, 2004, 5:30 p.m.
COMMITTEE MEMBERS
Anthony -Present
Cook -Not Present
Kraemer -Present
McCracken -Present
Eckenrode -Present
Anderson -Not Present
ALTERNATE MEMBERS
Barr -Present
Franklin -Present
Chavez -Not Present
Collins -Present
Duval -Not Present
Cavecche -Present
DIRECTORS IN ATTENDANCE
Bannister -Present
CONSENT CALENDAR (ITEM NO. 1)
1. MINUTES OF PREVIOUS MEETING
RECOMMENDATION: APPROVE MINUTES OF THE
SEPTEMBER 13 AND 27, 2004 GROUNDWATER
REPLENISHMENT SYSTEM STEERING COMMITTEE
MEETING AS MAILED.
2. ISSUANCE OF CHANGE ORDER NO. 2
TO OCB REPROGRAPHICS SERVICES
AGREEMENT FOR REPROGRAPHIC
SERVICES
RECOMMENDATION: AGENDIZE FOR THE
OCTOBER 20 OCWD BOARD MEETING: AUTHORIZE
ISSUANCE OF CHANGE ORDER No. 2 TO THE OCB
REPROGraphics Services Agreement
(No. 241375) IN THE AMOUNT OF $50,000 FOR
REPROGRAPHIC SERVICES; AND TRANSFER $50,000
FROM PROGRAM CONTINGENCY TO THE LINE ITEM
FOR THIS ACCOUNT TO BUDGET THIS WORK.
END OF CONSENT
-1 -
MOTIONNOTE
ANTHONY-AYE
KRAEMER-AYE
BARR-SECOND
ECKENRODE-AYE
MCCRACKEN-AYE
COLLINS-MOTION
ANTHONY-AYE
KRAEMER-AYE
BARR-SECOND
ECKENRODE-AYE
MCCRACKEN-AYE
COLLINS-MOTION
AGENCY
OCWD
OCSD
OCWD
ACTION TAKEN
COMMITTEE APPROVED
RECOMMENDATION
COMMITTEE APPROVED
RECOMMENDATION
MATTERS FOR CONSIDERATION
3. ADDENDUM No. 5 TO PROFESSIONAL
SERVICES AGREEMENT WITH MWH
AMERICAS, INC. FOR CONSTRUCTION
MANAGEMENT SERVICES FOR THE
GROUNDWATER REPLENISHMENT SYSTEM
PROGRAM
RECOMMENDATION: AGENDIZE FOR THE
OCTOBER 20 OCWD AND NOVEMBER 24 OCSD
BOARD MEETINGS: APPROVE AND AUTHORIZE
ISSUANCE OF ADDENDUM NO. 5 TO THE
PROFESSIONAL SERVICES AGREEMENT WITH
MONTGOMERY WATSON HARZA, INCREASING THE
AUTHORIZED AMOUNT BY $295,707 FROM
$13,359,084 TO AN AMOUNT NOTTO EXCEED
$13,654,791 FOR CHANGES IN THE SCOPE OF
WORK.
INFORMATIONAL ITEMS
4. Pall Lawsuit Update
5. ADVANCED WATER PURIFICATION FACILITY
COST SAVINGS UPDATE
6. PROJECT SCHEDULE AND BUDGET UPDATE
7. CONSTRUCTION PROJECTS
PROGRESS
• PROJECT PROGRESS PHOTOS
• OUTREACH
8. MONTHLY CHANGE ORDER UPDATE
9. STATUS REPORT
• GRANTS AND LOANS UPDATE
• PUBLIC INFORMATION AND EDUCATION
UPDATE
DIRECTORS' ANNOUNCEMENTS/ REPORTS
GENERAL MANAGERS' ANNOUNCEMENTS/
REPORTS
ADJOURNMENT
-2-
GWRS Steering Committee
October 11, 2004
ANTHONY-AYE QUESTIONS WERE
KRAEMER-SECOND RAISED AS TO WHETHER
BARR-AYE FULL TIME INSPECTION IS
ECKENRODE-AYE REQUIRED FOR THIS
MCCRACKEN-AYE AREA AND WHETHER THE
COLLINS-MOTION HOURLY COST WAS TOO
HIGH.
STAFF WAS DIRECTED TO
PROVIDE ADDITIONAL
JUSTIFICATION FOR THE
REQUEST.
ITEM WAS DEFFERED TO
A LATER DATE.
6:20 pm
... BOARD OF DIRECTORS Meeting Da te To Bel . of Dir.
10/27/04
AGENDA REPORT Item Number Item Number
lS(b)
Orange County Sanitation District
FROM: David Ludwin , Director of Engineering
Originator: Wendy Sevenandt, CIP Project Manager
SUBJECT: GROUNDWATER REPLENISHMENT SYSTEM, JOB NO . J-36
GENERAL MANAGER'S RECOMMENDATION
Approve an agreement with Porter Novelli, providing for one year of additional services
for the public information and outreach program for the Groundwater Replenishment
System , Job No. J-36 , for an amount not to exceed $615,000 , to be equally cost shared
with the Orange County Water District.
SUMMARY
• The Groundwater Replenishment (GWR) System budget includes four years of a
public relations program totaling $3,600 ,000 .
• In September 2001 , the Board approved an agreement between Orange County
Water District (OCWD) and Porter Novelli (PN) for the GWR System public
information and education program for a two-year period at a cost not to exceed
$1 ,800 ,000 . This agreement expired October 18, 2003 .
• In October 2003, the Board approved an additional year of the program at a cost not
to exceed $900,000 with PN as the lead consultant. This agreement expires
October 22, 2004.
• PN and its subcontractors are providing strategic counsel and support for the GWR
System public information and outreach program .
• Components of the program include research , community relations , outreach to
government, business , minority, academic and health leaders , media relations ,
advertising, and collateral development.
• The GWR System Steering Committee recommends issuing a Professional Services
Agreement for an additional one-year term with a budget of $615 ,000 to continue the
GWR System outreach program . Orange County Sanitation District's (OCSD) 50%
share of this additional fee would be $307 ,500 .
PRIOR COMM ITTEE/BOARD ACTIONS
1. September 26, 2001-Board approval of a two-year agreement
2 . October 22, 2003-Board approval of a one-year agreement
3 . September 13, 2004 -GWR System Steering Committee approval of a one-year
agreement
C:\Documents and Settings\Ow-Yeang\Local Setti ngs\Temporary Internet Fi les\OLK7AA\ltem 15(b) GWR.doc
Revised 06/04/03 Page 1
PROJECT/CONTRACT COST SUMMARY
Authorization of $307 ,500 from the Construction Phase budget is being requested as
shown in the attached Budget Information Table.
BUDGET IMPACT
~ This item has been budgeted . (Line item: Section 8-page 141 , Water Management
Projects , J-36)
D This item has been budgeted , but there are insufficient funds.
D This item has not been budgeted .
D Not applicable (information item)
ADDITIONAL INFORMATION
See attached GWR System Steering Committee Agenda Item Submittal.
ALTERNATIVES
The alternative would be to solicit proposals from other firms and go through a formal
selection process . District Staff has negotiated budget and scope for this coming year's
program with Porter Novelli and believes it is in the best interest of the project to keep
the current team in place . The public information program has enjoyed much success
and has tremendous momentum at this point in time and it is crucial that this be
maintained . The learning curve for a new team to come on board is estimated to be
from several months to upwards of a year at a substantial cost and additional risk .
CEQA FINDINGS
The Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the
GWR System was certified by the OCSD and the OCWD Board of Directors on March
24, 1999 . Addendum No . 1 was approved on March 28 , 2001 . Addendum No . 2 was
approved by OCSD on January 23 , 2002 , and by OCWD on January 16, 2002 .
Amendment No . 3 was approved by OCSD on March 24 , 2004 and by the GWR System
Steering Committee on December 1, 2003 .
ATTACHMENTS
1. Budget Information Table
2 . Agenda Item Submittal to the GWRSSC RE: Renewal of Public Information &
Education Task Order
WS :ba
C:\Documents and Settings\Ow-Yeang\Local Sett ings\Temporary Inte rn et F iles\OLK7AA\lte m 15(b) GW R.d oc
Revi sed· 06/04/03 Pag e 2
BUDGET INFORMATION TABLE
GROUNDWATER REPLENISHMENT (GWR) SYSTEM
JOB NO. J-36
Phase 1 -Pro·ect Develo ment $ 700,000 $ 11,000 $
Phase 2 -Prelimina $ 3,321,000 $
Phase 3 -Desi n $ 9,849,000 $ 17,246,540 $ 17,246,540
Phase 4 -Construction $ 98,481,000 $ 217,933,460 $ 217 ,933,460 215,050,058
Phase 5 -Commissionin $ 977,000 $
Phase 6 -Close-Out $ 171,000 $
Phase 7 -Cantin enc $ 12,895,000 $ 12,000,000 $
PROJECT TOTAL $ 121,925,000 $ 251,660,000 $ -$ 251,660,000 235,628,598
Reimbursable Costs $ 45,000,000 $ 45,000,000
PROJECT NET $ 121,925,000 $ 191,206,000 206,660,000 190,628,598
PSA/Contract
. .. ,
Desion PSA $ 18,907,913 $ 18,907,913 $ 18,011,496 ";·
Construction Manangement
6,994,542 ·. Services PSA $ 6,994,542 :: . $ $ 6,445,283 · ..•. ;.
;;
Construction Contract $ 203,294,901 $ .;. $ 203,294,901 .;; $ 193,697,953 ;·· ..
C:\Documents and Settings\Ow-Yeang\Local Settings\Temporary Internet Flles\OLK7AA\[ltem 15(b) GWR-Att 1.xlsJPN yr4
C:\Documents and Settings\Ow-Yeang\local Seltings\Temporary Internet Fi!es\OLK7AA\llem 15(b) GWR-Att 1
$ 11,000 $ 10,500 95%
$ 3,321,000 $ 3,320,000 100%
$ 17,246,540 $ 15,545,000 90%
$ 215,357,558 $ 18,600,000 9%
$ -$ 434,000 0%
$ -$ 82,000 0%
$ 0%
$ 235,936,098 $ 37,991,500 16%
$ 45,000,000 $ 8,227,000 18%
$ 190,936,098 $ 29,764,500 16%
. . $ 18,011,496 $ 15, 134,000 84%
.· .. · ... } -. $ 6,445 283 $ 1,193,500 19%
,; $ 193,697,953 $ 17,918,500 9%
l
a
REVISED
AGENDA ITEM SUBMITTAL
Meeting Date: September 13, 2004
To: Groundwater Replenishment
System Steering Committee
From: Virginia Grebbien
Blake Anderson
Budgeted: Yes
Funding Source: OCWD/OCSD/Grants
Program/Line Item No.: GWRSATt4001s-11200
Cost Estimate: $615,000
General Counsel Approval: NIA
Project Report Approved: Yes
CEQA Compliance: Yes
Staff Contact: Ron Wildermuth, Carol Beekman
Subject: RENEWAL OF PUBLIC INFORMATION & EDUCATION TASK ORDER
SUMMARY
Porter Novelli (PN) and its subcontractors have been providing support for the
Groundwater Replenishment (GWR) System Public Information and Education Program
for the past three years. PN has assisted with construction outreach, speakers bureau,
community relations, outreach to government, business, minority and health leaders,
media relations, advertising and collateral development.
The current Professional Services Agreement (PSA) for PN was for a one-year term
with a budget of $900,000. This PSA expires October 22, 2004. Staff recommends
issuing a PSA for an additional one-year term with a budget of $615,000 to continue the
GWR System outreach program. The PN team will include Tashiro Choi & Associates
(minority outreach), along with KW Communications and a to be identified sub-
consultant (construction outreach).
RECOMMENDATION
Agendize for the September 15 OCWD Board meeting and October 27 OCSD Board
meeting: Approve and authorize issuance of a one-year Professional Services
Agreement to Porter Novelli in the amount of $615,000 for the GWRS Public
Information and Education Program.
DISCUSSION/ANALYSIS
Following the first two years of the task order, the program was under budget by more
than $83,000. The current program is also on track to come in under budget.
In light of both Districts experiencing budget cutbacks and the increased construction
cost of the A WTF, we are proposing an overall decrease of 28 32 percent (from
REVISED
$900,000 to $615,000) in the Public Information and Education contract budget.
However, construction outreach remains a top priority and adequate resources are
allocated toward this effort. With both Districts experiencing budget cutbacks, rate
increases, and the increased capital cost of the AWTF, it is prudent to conserve
resources now, in the event more resources may be required in the future. Experience
with other projects indicates that opposition tends to surface nearer project start-up and
operation. While a reduction is proposed in the 2004-2005 budget and outreach
program, a ramp up of communications efforts 18-24 months prior to project completion
may be needed.
The public information and outreach program is on track to accomplish a number of its
measurable objectives for the contract year. Most importantly, to date, there are no
organized opposition groups to the project. We evaluate the success of this year's
outreach program based on this partial list of accomplishments for the contract year
October 23, 2003 to the present:
Construction Outreach
• Implemented an aggressive construction community outreach program utilizing
two community liaisons that appears to have gained support for the project
around the Fountain Valley neighborhood and proactively outreached to
neighbors potentially impacted by pipeline construction in Anaheim, Orange, and
Santa Ana
• Instituted creative "cul-de-sac" and "pizza" meetings, which resulted in successful
neighbor support
Speakers Bureau
• Coordinated 118 presentations
• Received 38 new endorsement letters
Minority Relations
• Cultivated support from three minority health clinics and county-wide minority
health organizations
• Received an endorsement from Vietnamese Bishop Luong
• Hosted informational tables at minority events reaching thousands of residents in
the Vietnamese, Korean and Filipino communities
• Placed articles in minority news publications
• Received 20 minority leader and minority organization endorsements to date
Government Outreach
• Coordinated two elected officials/staff workshops (50 attendees total)
• Briefed ten new councilmembers
• Briefed two city councils
• Briefed nine planning commissions
• Briefed six parks and recreation commissions
• Distributed project news/information to elected officials (sometimes monthly,
quarterly at a minimum)
.f
'
REVISED
Media Relations
• Placed 26 balanced and/or positive local media stories/news briefs
• Taped three cable TV public affairs programs
• Placed five trade articles
• Distributed eight media releases announcing project milestones
• Media trained three OCWD directors
Community Leadership Advisory Council
• Hosted an informational event with guest speakers Dr. John Balbus,
Environmental Defense and Huell Howser, host of California's Gold on KCET
Collateral Development
• Produced "Other Successful Water Reuse Projects" white paper
• Updated and reprinted "Studies Conclude Water Produced by Groundwater
Replenishment System Will Be Safe, Improve Basin's Quality" white paper
• Produced project video in partnership with Huell Howser Productions
• Produced GWR System and water conservation fact sheets in Spanish and
Vietnamese
• Produced GWR System fact sheet in Korean
Public Health/Medical Outreach
• Received six additional national public health/medical endorsements, for a total
of 10 to date
• Received seven local public health/medical endorsements
• Received 36 public health/medical endorsements to date (26 local and 10
national)
Staff has negotiated a budget and scope for this coming year's program with PN. The
public information program has enjoyed much success and has tremendous momentum
at this point in time and it is crucial that this be maintained.
A summary of the Public Information Program scope, budget and consultants is as
follows:
Program Element
Construction Outreach
Speakers Bureau
Minority Outreach
Government Outreach
Media Relations
Pr()gram Mana.gement
. Crisis Managemerit
Telephone Poll
Budget Subconsultant
$ 280,000 K\'V Commt;mications PN
and outreach consultants
30,000 N/A
62,500 PN and Tashiro Choi &
Associates
40,000 N/A
25,000 .. N/A
4~,50,0 N/A
20,000 N/A
30,000 N/A
Program Element
' Mailings
't5orrimunity ··Leadershii:>Advlsor}t ... council
Collateral Materials
Administratiy~. ~xp~n~e
. _G~~t.ingency
Total $
Budget
. J.?.,QQ9. .. N/A
5,000 N/A
10,()00 N/A
1 ~.r..999... N/A
39.000 NIA
-.. ~~5,000 ..
REVISED
Subconsultant
A more detailed budget and scope are attached for your information.
PRIOR COMMITTEE ACTIONS
July 15, 2004 -The Public Information and Education (PIE) Subcommittee voted to
recommend the Porter Novelli task order for renewal to the Steering Committee for
$615,000 for one year.
October 22, 2003 -OCSD Board approved a one-year task order for Porter Novelli in
the amount of $900 ,000.
October 15, 2003 -OCWD Board approved a one-year task order for Porter Novelli in
the amount of $900,000.
September 8, 2003 -The GWR System Steering Committee recommends a one-year
task order for Porter Novelli in the amount of $900,000.
August 26, 2003 -The Public Information and Education (PIE) Subcommittee voted to
recommend the Porter Novelli task order for renewal to the JCC for $900,000 for one
year, with the condition that the $132,000 allocated in the budget for direct mail,
advertising and phone banks cannot be utilized until further discussion and approval of
the PIE.
October 17, 2001 -OCWD Board approved a two-year task order for NCG Porter
Novelli in the amount of $1,800,000, not to exceed $900,000 per year.
September 26, 2001 -OCSD Board approved a two-year task order for NCG Porter
Novelli in the amount of $1,800,000, not to exceed $900,000 per year.
August 27, 2001 -The JCC selected NCG Porter Novelli as the Public Information and
Education firm for Phase IV of the GWR Public Outreach Program.
June 11, 2001 -The Joint Groundwater Replenishment System Cooperative Committee
(JCC) approved a Request for Proposals (RFP) to solicit public relations teams for a
level of effort of $900,000 per year for two years, with an option to renew for at least an
additional $900,000 per year for two additional years.
Groundwater Replenishment System
Public Information Program
2004-2005 Budget
Proposed 2004-2005 Public Information Program Budget
Program Element Proposed 2004-2005 Current 2003-2004 Budget
Budget
TOTAL $650,000 $900,000
Construction Outreach $280,000 $260,000
• Construction outreach strategy &
planning
• Community liaisons (2)
• Mailings, fliers & newsletters
• Neighborhood meetings
Speakers Bureau $30,000 $48,000
• Solicitation of presentations via
telephone and direct mail with the
following audiences:
> PT As
> Homeowners associations
> Business leaders & chambers of
commerce
> Medical group boards of
directors
;;;... If time pennits: individual members
of the medical community, religious
community, financial community,
retirees, small businesses, WIPs or
societal elites, and labor
• Scheduling staff for presentation &
coordinating logistics
• Cultivation of endorsement letters
both from organizations & individuals
Minority Outreach $62,500 $103,125
• Minority outreach strategy &
planning
• Cultivation of endorsements from
minority leaders & organizations
• Minority media relations
• Translations
REVISED
Increase/Decrease from
Current Budget to Proposed
Budget
a 32 percent decrease
7 percent increase
+$20,000
38 percent decrease
($18,000)
40 percent decrease
($40,_625)
1
REVISED
Government Outreach $75,QQQ $40,000 $101,680 ~ 61 percent decrease
• Government outreach strategy & ($26,680) ($61,680)
planning
• Letters and other regular updates to
database of elected officials
• City relations program with city
managers & department heads
• New councilmember briefings
• Workshops (project updates)
Media Relations (Local) $25,000 $66,000 62 percent decrease
• Media strategy & planning ($41,000)
• Media releases
• Cable TV public affairs programs
• Key message development
• Media training
Program Management $43,500 $57,855 25 percent decrease
• Monthly client meetings ($14,355)
• Monthly subcontractor conference
calls
• Weekly reporting to client team
• Support for reporting to PIE &
Steering Committees
• Budget trackina
Crisis Management $20,000 $15,000 33 percent increase
• Strategy & planning +$5,000
• Key message development
• Sookesperson counsel
Telephone Poll $30,000 0 100 percent increase
• 500 high propensity voters and a +$30,000
special subgroup poll of targeted
leadership groups throughout the
service area
Mailings/Fast Faxes $12,000 $12,000 No change
• Regular mailings & fast faxes to 0
elected officials, supporters and
opinion leaders
Community Leadership Advisory $5,000 $5,000 No change
Council 0
• Planning
• Annual event
• Communications
2
REVISED
Collateral Materials (reprints) $10,000 $20,000 50 percent decrease
($10,000)
Administrative Expenses $18,000 $17,150 5 percent increase
• Workshop catering +$850
• Miscellaneous graphic design
• Phone, fax, postage, photocopying,
mileage
• Team meetings
• Miscellaneous program materials
• Video production & dubs
Contingency $39,000 $51,860 25 percent decrease
($12,860)
Business Outreach 0 $30,000 100 percent decrease
($30,000)
Trade Media, Awards & Opposition 0 $30,600 100 percent decrease
Monitoring ($30,600)
National Public Health/Medical 0 $15,000 100 percent decrease
Outreach ($15,000)
Advertising 0 $49,230 100 percent decrease
($49,230)
Milestone Events 0 $17,500 100 percent decrease
($17,500)
Proposed components of the 2001-2004 programs to be suspended from the 2004-2005 program:
• Trade and national media relations
• New collateral development
• State and federal government relations (will be handled by OCWD/OCSD)
• Business outreach (except as done by OCWD/OCSD)
• National public health/medical outreach (except as done by OCWD/OCSD)
• Minority festival sponsorships
• Advertising
• Awards entries
• Milestone events
3
REVISED
Because of this proposed reduction in scope of work and budget we would recommend temporarily suspending the following team members:
• Glaab & Associates
• Christine Diemer lger
• Katz & Associates
• Mark Kohorst
• Johnson/Ukropina
If over the coming year, we determine that the project could benefit from short-term utilization of any of the suspended team members'
expertise, task orders could be issued under the contingency.
Also, should opposition or other issues arise that could potentially impact the success of the project, we should be prepared to do whatever
necessary including direct mail and/or advertising to mitigate the situation.
4
-
OMTS COMMITTEE Meetin g Date T o Bd . of Dir.
10/06/04 10/27/04
AGENDA REPORT Item Number Item Nu mber
Orange County Samtat1on District
FROM: Robert P. Ghirelli, D.Env., Director of Technical Services
Originator: Mahin Talebi, Source Contro l Manager
OMTS04-Sl
SUBJECT: Ordinance No . OCSD-25 , Adopting Fats , Oils , and Grease Control
Regulations Applicable to Food Service Establishments for the City of
Tustin and Unincorporated Area above Tustin -First Reading
GENERAL MANAGER'S RECOMMENDATION
That the OMTS Committee recommend to the Board of Directors to proceed with the
first reading of adopting Ordinance No . OCSD-25 on October 27 , 2004 .
SUMMARY
16
Staff is presenting Ordinance No . OCSD-25, regarding Fats , Oils , and Grease Control
Regulations applicable to food service establishments for the City of Tustin and the
unincorporated area north of Tustin and seeking the comm ittee's recommendation to
proceed with the first reading for adopting Ordinance No. OCSD-25 , on October 27,
2004. The second reading and final adoption by the Board of Directors is anticipated in
November 2004 .
FOG Control Ordinance
• Under sewer service agreements dating back to the 1980's , OCSD owns and
operates the loca l sewers in Tustin and the unincorporated area north of Tustin. As
the local sewer authority, the District is responsible for the FOG Control Program in
these areas .
• The Regional Water Quality Control Board requires the District to execute a FOG
Ordinance by December 30 , 2004. Staff is presenting the draft Ord inance for initial
consideration. The Core Elements of the proposed Ordinance include permitting ,
kitchen BMPs and grease interceptor requirements , monitoring , and enforcement
provisions . Staff believes that the proposed Ordinance will enable the District to
implement an economically feasible , practical , and effective FOG Control Program
for about 250 food service establ ishments (FSEs) in the Tustin area .
• The proposed Ordinance provides a flexible approach based on a case-by-case
evaluation at each FSE before installation of a grease inceptor is required . It also
includes provisions to issue waivers to de minimis FOG dischargers and variances
to those that provide equivalent alternative technology for controlling FOG
discharges .
• Initial outreach to FSEs was conducted during the FOG characterization phase ,
when FSEs were inspected and informed about the upcoming FOG Control
Program . Staff briefed the Tustin City Council about the program on August 2 , 2004.
The District also held a workshop in Tustin on August 3, 2004 , to inform restaurant
owners about the Ordinance and to solicit their comments.
• On September 1, 2004, staff informed this committee about the proposed Ordinance
and its intent to pursue the adoption of the Ordinance. On September 3 , 2004 , staff
mailed to the FSEs the Ordinance and fact sheets that summarize the core elements
of the Ordinance in layman's language. To date, a few comments have been
received. After reviewing these comments , staff is not recommending any changes
to the Ordinance . Staff is planning additional outreach activities before the adoption
of the Ordinance in November 2004 .
• Barring any unforeseen complications , the second reading (and adoption) will occur
in November, and the Ordinance will be published 15 days after it has been adopted
and become effective in December.
• After adoption of the Ordinance No . OCSD-25 , staff will recommend a fee resolution
for both permit and non-compliance fees (estimated at $100 each) to this committee .
PRIOR COMMITTEE/BOARD ACTIONS
NONE
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
D This item has been budgeted. (Line item: )
D This item has been budgeted , but there are insufficient funds .
D This item has not been budgeted .
lZI Not applicable (information item)
ADDITIONAL INFORMATION
In April 2002 , the Santa Ana California Regional Water Control Board (Regional Board)
issued Order No. RS-2002-0014 , General Waste Discharge Requirements (WDR),
requiring Orange County cities and sewering agencies under the jurisdiction of the
Regional Board to monitor and control sewer spills and to prepare and implement FOG
Control Programs by December 30 , 2004 . The District was named as one of the
co-permittees and also designated as a facilitator for the regional effort to coordinate the
development of the programs and implementation .
Page 2
~
4
\
Following the promulgation of the Order, the co-permittees determined that the interests
of the county would best be met by conducting a comprehensive FOG Control Study to
establish the technical, administrative, and ordinance building blocks of such a program,
while providing a regional, practical, and equitable approach throughout Orange County.
Staff and co-permittees agreed to conduct the study in two phases.
Phase I ended in June 2003, and resulted in a draft Phase I report, which identified 12
programmatic building blocks for an effective FOG Control Program. The study also
identified regional issues and three newer technologies that must be addressed in
Phase II of the FOG Control Study before the report can be finalized.
In July 2003, the Board authorized staff to enter into an agreement to conduct Phase II
of the FOG Control Study and to enter into agreements with the other co-permittees to
fund the study by using a fair-share formula based on population. The District also
received a Proposition 13 grant to help offset some of the cost of Phase II.
In addition to the regional efforts, the District is also preparing the FOG Control Program
for the sewer systems in the City of Tustin and the unincorporated area above Tustin,
which are owned and operated by the District.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
N/A
Page3
ORDINANCE NO. OCSD-25
ADOPTING FATS, OILS AND GREASE CONTROL REGULATIONS
APPLICABLE TO FOOD SERVICE ESTABLISHMENTS
AN ORDINANCE OF THE BOARD OF DIRECTORS OF ORANGE
COUNTY SANITATION DISTRICT ADOPTING FATS, OILS AND
GREASE CONTROL REGULATIONS APPLICABLE TO FOOD SERVICE
ESTABLISHMENTS
WHEREAS, pursuant to the County Sanitation District Act, Health & Safety Code
§§4700 et seq., the Orange County Sanitation District ("District") has the authority to
adopt ordinances relating to the provision of sewer services and facilities, and
regulations of those services and facilities; and
WHEREAS, the Regional Water Quality Control Board ("RWQCB") for the Santa
Ana Region adopted Order RS-2002-0014, which prescribes general waste discharge
requirements prohibiting sanitary sewer overflows ("SSOs") by sewer collection
agencies; and
WHEREAS, in Order RS-2002-0014, the RWQCB found that one of the leading
causes of SSOs within the Santa Ana Region, which encompasses the District's service
area is "grease blockages;" and
WHEREAS, SSOs often caused by discharge of wastewater containing high
levels of fat, oils and grease ('FOG"), suspended solids, pathogenic organisms, and
other pollutants, may cause temporary exceedances of applicable water quality
objectives, pose a threat to the public health, adversely affect aquatic life, and impair the
public recreational use and aesthetic enjoyment of surface waters within the District's
service area; and
WHEREAS, the 2000-2001 Orange County Grand Jury ("Grand Jury") conducted
a survey among 35 wastewater collection and treatment agencies in Orange County and
concluded that one of the leading causes of SSOs and sewage spills is sewer lines
clogged from the accumulation of FOG discharged from Food Service Establishments;
and
WHEREAS, the Grand Jury further concluded that more effective methods of
minimizing grease discharges into the sewer system must be developed and
implemented to reduce the discharge of FOG to the sewer system in order to prevent
sewer blockages and SSOs; and
WHEREAS, Order No. RS-2002-0014 requires the District to monitor and control
SSOs and to develop a FOG Control Program by December 30, 2004; and
WHEREAS, in light of the overwhelming evidence that FOG is a primary cause of
SSOs, the District desires to implement a FOG Control Program to prevent SSOs; and
WS&S -OXS:pj:#189145:08/06/04 1
WHEREAS, Section 1014 of the 2001 California Plumbing Code, applicable to all
occupancies in the State pursuant to the California Building Standards Law, requires the
installation of grease traps or interceptors when in the opinion of the Building Official
waste pretreatment is required; and
WHEREAS, the foregoing findings indicate that a FOG Control Program is
required for Food Service Establishments within the District's jurisdiction to comply with
waste discharge regulations and prevent the harmful effects of SSOs: and
WHEREAS, the regulations adopted herein will require existing Food Service
Establishments to install grease control devices or interceptors no later than three years
from the effective date of this Ordinance, and the Board finds that three years is a
reasonable amortization period for existing Food Service Establishments that are
operating without a grease control device or grease interceptor: and
WHEREAS, the Board of Directors finds that specific enforcement provisions
must be adopted to govern discharges of wastewater to the District's system by Food
Service Establishments.
NOW, THEREFORE, the Board of Directors does hereby ordain as follows:
WS&S -OXS:pj:#189145:08/06/0-l 2
'
ARTICLE 1 -GENERAL PROVISIONS
1.1 PURPOSE AND POLICY
A. The purpose of this Ordinance is to facilitate the maximum beneficial
public use of the District's sewer services and facilities while preventing
blockages of the sewer lines resulting from discharges of FOG to the
sewer facilities, and to specify appropriate FOG discharge requirements
for Food Service Establishments.
B. This Ordinance shall be interpreted in accordance with the definitions set
forth in Section 1.2. The provisions of this Ordinance shall apply to the
direct or indirect discharge of all wastewater or waste containing FOG
carried to the sewer facilities of the District.
C. To comply with Federal, State, and local policies and to allow the District
to meet applicable standards, provisions are made in this Ordinance for
the regulations of wastewater or waste containing FOG discharges to the
sewer facilities.
D. This Ordinance establishes quantity and quality standards on all
wastewater and/or waste discharges containing FOG, which may alone or
collectively cause or contribute to FOG accumulation in the sewer
facilities causing or potentially causing or contributing to the occurrence of
SSOs.
1.2 DEFINITIONS
A. Unless otherwise defined herein, terms related to water quality shall be as
adopted in the latest edition of Standard Methods for Examination of
Water and Wastewater, published by the American Public Health
Association, the American Water Works Association and the Water
Environment Federation. The testing procedures for waste constituents
and characteristics shall be as provided in 40 CFR 136 (Code of Federal
Regulations).
B. Other terms not herein defined are defined as being the same as set forth
in the latest adopted applicable editions of the California Codes
applicable to building construction adopted pursuant to the California
Building Standards Law.
C. Subject to the foregoing provisions, the following definitions shall apply in
this Ordinance:
WS&S-OXS:pj:#189145:08/06/04 3
Best Management
Practices
Board
Change in Operations
Composite Sample
Discharger
District
Sewer Facility or
System
Effluent
Fats, Oils, and
Grease ("FOG")
Schedules of activities, prohibitions of practices,
maintenance procedures and other management
practices to prevent or reduce the introduction of FOG
to the sewer facilities.
The Board of Directors of the District.
Any change in the ownership, food types, or
operational procedures that have the potential to
increase the amount of FOG generated and/or
discharged by Food Service Establishments in an
amount that alone or collectively causes or creates a
potential for SSOs to occur.
A collection of individual samples obtained at selected
intervals based on an increment of either flow or time.
The resulting mixture (composite sample) forms a
representative sample of the wastestream discharged
during the sample period. Samples will be collected
when a wastewater discharge occurs.
Any person who discharges or causes a discharge of
wastewater directly or indirectly to a public sewer.
Discharger shall mean the same as User.
The Orange County Sanitation District.
Any property belonging to the District used in the
treatment, reclamation, reuse, transportation, or
disposal of wastewater, or sludge.
Any liquid outflow from the Food Service Establishment
that is discharged to the sewer.
Any substance such as a vegetable or animal product
that is used in, or is a by product of, the cooking or
food preparation process, and that turns or may turn
viscous or solidifies with a change in temperature or
other conditions.
FOG Control Program The FOG Control Program required by and developed
pursuant to RWQCB Order No. RS-2002-0014, Section
(c)(12)(viii).
WS&S -OXS:pj:#189145:08/06/04 4
FOG Control Program
Manager
FOG Wastewater
Discharge Permit
Food Service
Establishment
Food Grinder
Grease Control
Device
WS&S-OXS:pj:#189145:08/06/04
The individual designated by the District to administer
the FOG Control Program. The FOG Control Program
Manager is responsible for all determinations of
compliance with the program, including approval of
discretionary variances and waivers.
A permit issued by the District subject to the
requirements and conditions established by the District
authorizing the permittee or discharger to discharge
wastewater into the District's facilities or into sewer
facilities which ultimately discharge into a District
facility.
Facilities defined in California Uniform Retail Food
Service Establishments Law (CURFFL) Section
113785, and any commercial entity within the
boundaries of the District, operating in a permanently
constructed structure such as a room, building, or
place, or portion thereof, maintained, used, or operated
for the purpose of storing, preparing, serving, or
manufacturing, packaging, or otherwise handling food
for sale to other entities, or for consumption by the
public, its members or employees, and which has any
process or device that uses or produces FOG, or
grease vapors, steam, fumes, smoke or odors that are
required to be removed by a Type I or Type II hood, as
defined in CURFFL Section 113785. A limited food
preparation establishment is not considered a Food
Service Establishment when engaged only in
reheating, hot holding or assembly of ready to eat food
products and as a result, there is no wastewater
discharge containing a significant amount of FOG. A
limited food preparation establishment does not include
any operation that changes the form, flavor, or
consistency of food.
Any device installed in the plumbing or sewage system
for the purpose of grinding food waste or food
preparation by products for the purpose of disposing it
in the sewer system.
Any grease interceptor, grease trap or other
mechanism, device, or process, which attaches to, or
is applied to, wastewater plumbing fixtures and lines,
the purpose of which is to trap or collect or treat FOG
prior to it being discharged into the sewer system.
"Grease control device" may also include any other
proven method to reduce FOG subject to the approval
of the District.
5
Grease Disposal
Mitigation Fee
Grease Interceptor
Grease Trap
General Manager
Grab Sample
Hot Spots
Inflow
Infiltration
WS&S -OXS:pj:#189145:08/06/0·I
A fee charged to an Owner/Operator of a Food Service
Establishment when there are physical limitations to
the property that make the installation of the usual and
customary grease interceptor or grease control device
for the Food Service Establishment under
consideration, impossible or impracticable. The
Grease Disposal Mitigation Fee is intended to cover
the costs of increased maintenance of the sewer
system for inspection and cleaning of FOG and other
viscous or solidifying agents that a properly employed
grease control device would otherwise prevent from
entering the sewer system.
A multi-compartment device that is constructed in
different sizes and is generally required to be located,
according to the California Plumbing Code,
underground between a Food Service Establishment
and the connection to the sewer system. These
devices primarily use gravity to separate FOG from the
wastewater as it moves from one compartment to the
next. These devices must be cleaned, maintained, and
have the FOG removed and disposed of in a proper
manner on regular intervals to be effective.
A grease control device that is used to serve individual
fixtures and have limited effect and should only be
used in those cases where the use of a grease
interceptor or other grease control device is
determined to be impossible or impracticable.
The individual duly designated by the Board of
Directors of the District to administer this Ordinance.
A sample taken from a waste stream on a one-time
basis without regard to the flow in the waste stream
and without consideration of time.
Areas in sewer lines that have experienced sanitary
sewer overflows or that must be cleaned or maintained
frequently to avoid blockages of sewer system.
Water entering a sewer system through a direct
stormwater/ runoff connection to the sanitary sewer,
which may cause an almost immediate increase in
wastewater flows.
Water entering a sewer system, including sewer
service connections, from the ground through such
means as defective pipes, pipe joints, connections, or
manhole walls.
6
Inspector
Interceptor
Interference
Local Sewering
Agency
NP DES
New Construction
Permittee
Person
Public Agency
Public Sewer
WS&S -OXS:pj:#189145:08/06/04
A person authorized by the District to inspect any
existing or proposed wastewater generation I
conveyance! processing, and disposal facilities.
A grease interceptor.
Any discharge which, alone or in conjunction with
discharges from other sources, inhibits or disrupts the
District's sewer system, treatment processes or
operations; or is a cause of violation of the District's
NPDES or Waste Discharge Requirements or prevents
lawful sludge use or disposal.
Any public agency or private entity responsible for the
collection and disposal of wastewater to the District's
sewer facilities duly authorized under the laws of the
State of California to construct and/or maintain public
sewers.
The National Pollutant Discharge Elimination System;
the permit issued to control the discharge of liquids or
other substances or solids to surface waters of the
United States as detailed in Public Law 92-500,
Section 402.
Any structure planned or under construction for which
a sewer connection permit has not been issued.
A person who has received a permit to discharge
wastewater into the District's sewer facilities subject to
the requirements and conditions established by the
District.
Any individual, partnership, firm, association,
corporation or public agency! including the State of
California and the United States of America.
The State of California and/or any city, county, special
district, other local governmental authority or public
body of or within this State.
A sewer owned and operated by the District, or other
local Public Agency, which is tributary to the District's
sewer facilities.
7
Regulatory Agencies Regulatory Agencies shall mean those agencies
having regulatory jurisdiction over the operations of the
District, including, but not limited to:
Remodeling
Sample Point
Sampling Facilities
Sewage
Sewer Facilities or
System
WS&S-OXS:pj:#189145:08/06/04
a) United States Environmental Protection
Agency, Region IX, San Francisco and
Washington, DC (EPA).
b) California State Water Resources Control
Board (SWRCB).
c) California Regional Water Quality Control
Board, Santa Ana Region (RWQCB).
d) South Coast Air Quality Management District
(SCAQMD).
e) California Department of Health Services
(OOHS).
A physical change or operational change causing
generation of the amount of FOG that exceed the
current amount of FOG discharge to the sewer system
by the Food Service Establishment in an amount that
alone or collectively causes or create a potential for
SSOs to occur; or exceeding a cost of $50,000 to a
Food Service Establishment that requires a building
permit, and involves any one or combination of the
following: (1) Under slab plumbing in the food
processing area, (2) a 30% increase in the net public
seating area, (3) a 30% increase in the size of the
kitchen area, or (4) any change in the size or type of
food preparation equipment.
A location approved by the District, from which
wastewater can be collected that is representative in
content and consistency of the entire flow of
wastewater being sampled.
Structure(s) provided at the user's expense for the
District or user to measure and record wastewater
constituent mass, concentrations, collect a
representative sample, or provide access to plug or
terminate the discharge.
Wastewater.
Any and all facilities used for collecting, conveying,
pumping, treating, and disposing of wastewater and
sludge.
8
Sewer Lateral
Sludge
Twenty-five percent
(25%) Rule
User
Waste
Manifest
Waste Minimization
Practices
Wastehauler
Wastewater
WS&S-OXS:pj:#189145:08/06/04
A building sewer as defined in the latest edition of the
California Plumbing Code. It is the wastewater
connection between the building's wastewater facilities
and a public sewer system.
Any solid, semi-solid or liquid decant, subnate or
supernate from a manufacturing process, utility
service, or pretreatment facility.
Requirement for grease interceptors to be maintained
such that the combined FOG and solids accumulation
does not exceed 25% of the design hydraulic depth of
the grease interceptor. This is to ensure that the
minimum hydraulic retention time and required
available hydraulic volume is maintained to effectively
intercept and retain FOG discharged to the sewer
system.
Any person who discharges or causes a discharge of
wastewater directly or indirectly to a public sewer
system. User shall mean the same as Discharger.
Sewage and any and all other waste substances,
liquid, solid, gaseous or radioactive, associated with
human habitation or of human or animal nature,
including such wastes placed within containers of
whatever nature prior to and for the purpose of
disposal.
That receipt which is retained by the generator of
wastes for disposing recyclable wastes or liquid wastes
as required by the District.
Plans or programs intended to reduce or eliminate
discharges to the sewer system or to conserve water,
including, but not limited to, product substitutions,
housekeeping practices, inventory control, employee
education, and other steps as necessary to minimize
wastewater produced.
Any person carrying on or engaging in vehicular
transport of waste as part of, or incidental to, any
business for that purpose.
The liquid and water-carried wastes of the community
and all constituents thereof, whether treated or
untreated, discharged into or permitted to enter a
public sewer.
9
Wastewater
Constituents and
Characteristics
The individual chemical, physical, bacteriological, and
other parameters, including volume and flow rate and
such other parameters that serve to define, classify or
measure the quality and quantity of wastewater.
D. Words used in this Ordinance in the singular may include the plural and
the plural the singular. Use of masculine shall mean feminine and use of
feminine shall mean masculine. Shall is mandatory; may is permissive or
discretionary.
WS&S -OXS:pj:#189145:08/06/04 10
ARTICLE 2 -GENERAL LIMITATIONS, PROHIBITIONS, AND REQUIREMENTS ON
FATS, OILS, AND GREASE ("FOG") DISCHARGES
2.1 FOG DISCHARGE REQUIREMENT
No Food Service establishment shall discharge or cause to be discharged into
the sewer system FOG that exceeds a concentration level adopted by the Board
or that may accumulate and/or cause or contribute to blockages in the sewer
system or at the sewer system lateral which connects the Food Service
Establishment to the sewer system.
2.2 PROHIBITIONS
The following prohibitions shall apply to all Food Service Establishments:
A Installation of food grinders in the plumbing system of new constructions
of Food Service Establishments shall be prohibited. Furthermore, all food
grinders shall be removed from all existing Food Service Establishments
within 180 days of the effective date of this Ordinance, except when
expressly allowed by the FOG Control Program Manager.
B. Introduction of any additives into a Food Service Establishment's
wastewater system for the purpose of emulsifying FOG or
biologically/chemically treating FOG for grease remediation or as a
supplement to interceptor maintenance, unless a specific written
authorization from the FOG Control Program Manager is obtained.
C. Disposal of waste cooking oil into drainage pipes is prohibited. All waste
cooking oils shall be collected and stored properly in receptacles such as
barrels or drums for recycling or other acceptable methods of disposal.
D. Discharge of wastewater from dishwashers to any grease trap or grease
interceptor is prohibited.
E. Discharge of wastewater with temperatures in excess of 140°F to any
grease control device, including grease traps and grease interceptors, is
prohibited.
F. Discharge of wastes from toilets, urinals, wash basins, and other fixtures
containing fecal materials to sewer lines intended for grease interceptor
service, or vice versa, is prohibited.
G. Discharge of any waste including FOG and solid materials removed from
the grease control device to the sewer system is prohibited. Grease
removed from grease interceptors shall be wastehauled periodically as
part of the operation and maintenance requirements for grease
interceptors.
WS&S -OXS:pj:#189145:08/06/04 11
H. Operation of grease interceptors with FOG and solids accumulation
exceeding 25% of the design hydraulic depth of the grease interceptor
(25% Rule)
2.3 FOG WASTEWATER DISCHARGE PERMIT REQUIRED
No person shall discharge, or cause to be discharged any wastewater from Food
Service Establishments directly or indirectly into the sewer system without first
obtaining a FOG Wastewater Discharge Permit pursuant to this Ordinance.
2.4 BEST MANAGEMENT PRACTICES REQUIRED
All Food Services Establishments shall implement Best Management Practices in
its operation to minimize the discharge of FOG to the sewer system. Detailed
requirements for Best Management Practices shall be specified in the permit.
This may include kitchen practices and employee training that are essential in
minimizing FOG discharge.
2.5 FOG PRETREATMENT REQUIRED
Food Service Establishments are required to install, operate and maintain an
approved type and adequately sized grease interceptor necessary to maintain
compliance with the objectives of this Ordinance, subject to the variance and
waiver provisions of Section 2.6. The grease interceptor shall be adequate to
separate and remove FOG contained in wastewater discharges from Food
Service Establishments prior to discharge to the sewer system. Fixtures,
equipment, and drain lines located in the food preparation and clean up areas of
Food Service Establishments that are sources of FOG discharges shall be
connected to the grease interceptor. Compliance shall be established as follows:
A. New Construction of Food Service Establishments
New construction of Food Service Establishments shall include and install
grease interceptors prior to commencing discharges of wastewater to the
sewer system.
B. Existing Food Service Establishments
1. For existing Food Service Establishments, the requirement to
install and to properly operate and maintain a grease interceptor
may be conditionally stayed, that is, delayed in its implementation
by the FOG Control Program Manager for a maximum period of
three years from the effective date of this Ordinance (3-year
Amortization Period). Terms and conditions for application of a
stay to a Food Service Establishment shall be set forth in the
permit. The Board finds that three years is a reasonable
amortization period for existing Food Service Establishments that
are operating without a grease interceptor.
WS&S -OXS:pj:#189145:08/06/04 12
2. Existing Food Service Establishments, which have caused or
contributed to grease-related blockage in the sewer system, or
which have sewer laterals connected to hot spots, or which have
been determined to contribute significant FOG to the sewer
system by the FOG Control Program Manager based on
inspection or sampling, shall be deemed to have reasonable
potential to adversely impact the sewer system, and shall install
grease interceptors within 180 days upon notification by the
District.
3. Existing Food Service Establishments or Food Service
Establishments that change ownership, that undergo remodeling
or a change in operations as defined in Section 1.2 of this
Ordinance, shall be required to install a grease interceptor.
2.6 VARIANCE AND WAIVER OF GREASE INTERCEPTOR REQUIREMENT
A. Variance from Grease Interceptor Requirements
An existing Food Service Establishment may obtain a variance from the
grease interceptor requirement to allow alternative pretreatment
technology that is, at least, equally effective in controlling the FOG
discharge in lieu of a grease interceptor, if the Food Service
Establishment demonstrates that it is impossible or impracticable to
install, operate or maintain a grease interceptor. The FOG Control
Program Manager's determination to grant a variance will be based upon,
but not limited to, evaluation of the following conditions:
1. There is no adequate space for installation and/or maintenance of
a grease interceptor.
2. There is no adequate slope for gravity flow between kitchen
plumbing fixtures and the grease interceptor and/or between the
grease interceptor and the private collection lines or the public
sewer.
3. The Food Service Establishment can justify that the alternative
pretreatment technology is equivalent or better than a grease
interceptor in controlling its FOG discharge. In addition, the Food
Service Establishment must be able to demonstrate, after
installation of the proposed alternative pretreatment, its
effectiveness to control FOG discharge through downstream
visual monitoring of the sewer system, for at least three months,
at its own expense. A Variance may be granted if the results show
no visible accumulation of FOG in its lateral and/or tributary
downstream sewer lines.
B. Conditional Waiver from Installation of Grease Interceptor
An existing Food Service Establishment may obtain a conditional waiver
from installation of a grease interceptor, if the Food Service
WS&S -OXS:pj:#189145:08/06/04 13
Establishment demonstrates that it has negligible FOG discharge and
insignificant impact to the sewer system. Although a waiver from
installation of grease interceptor may be granted, the Food Service
Establishment may be required to provide space and plumbing
segregation for future installation of grease interceptor. The FOG Control
Program Manager's determination to grant or revoke a conditional waiver
shall be based upon, but not limited to, evaluation of the following
conditions:
1. Quantity of FOG discharge as measured or as indicated by the
size of Food Service Establishment based on seating capacity,
number of meals served, menu, water usage, amount of on-site
consumption of prepared food and other conditions that may
reasonably be shown to contribute to FOG discharges.
2. Adequacy of implementation of Best Management Practices and
compliance history.
3. Sewer size, grade, condition based on visual information, FOG
deposition in the sewer by the Food Service Establishment, and
history of maintenance and sewage spills in the receiving sewer
system.
4. Changes in operations that significantly affect FOG discharge.
5. Any other condition deemed reasonably related to the generation
of FOG discharges by the FOG Control Program Manager.
C. Waiver from Grease Interceptor Installation with a Grease Disposal
Mitigation Fee
For Food Service Establishments where the installation of grease
interceptor is not feasible and no equivalent alternative pretreatment can
be installed, a waiver from the grease interceptor requirement may be
granted with the imposition of a Grease Disposal Mitigation Fee as
described in Section 2.8. Additional requirements may be imposed to
mitigate the discharge of FOG into the sewer system. The FOG Control
Program Manager's determination to grant the waiver with a Grease
Disposal Mitigation Fee will be based upon, but not limited to, evaluation
of the following conditions:
1 . There is no adequate space for installation and/or maintenance of
a grease interceptor.
2. There is no adequate slope for gravity flow between kitchen
plumbing fixtures and the grease interceptor and/or between the
grease interceptor and the private collection lines or the public
sewer.
3. A variance from grease interceptor installation to allow alternative
pretreatment technology cannot be granted.
WS&S-OXS:pj:#189145:08/06/04 14
D. Application for Waiver or Variance of Requirement for Grease Interceptor
A Food Service Establishment may submit an application for waiver or
variance from the grease interceptor requirement to the FOG Control
Program Manager. The Food Service Establishment bears the burden of
demonstrating, to the FOG Control Program Manager's reasonable
satisfaction, that the installation of a grease interceptor is not feasible or
applicable. Upon determination by the FOG Control Program Manager
that reasons are sufficient to justify a variance or waiver, the permit will be
issued or revised to include the variance or waiver and relieve the Food
Service Establishment from the requirement.
E. Terms and conditions
A variance or waiver shall contain terms and conditions that serve as
basis for its issuance. A waiver or variance may be revoked at any time
when any of the terms and conditions for its issuance is not satisfied or if
the conditions upon which the waiver was based change so that the
justification for the waiver no longer exists. The waiver or variance shall
be valid so long as the Food Service Establishment remains in
compliance with their terms and conditions until the expiration date
specified in the variance or waiver.
2.7 COMMERCIAL PROPERTIES
Property owners of commercial properties or their official designee(s) shall be
responsible for the installation and maintenance of the grease interceptor serving
multiple Food Service Establishments that are located on a single parcel.
2.8 GREASE DISPOSAL MITIGATION FEE
Food Service Establishments that operate without a grease control interceptor
may be required to pay an annual Grease Disposal Mitigation Fee to equitably
cover the costs of increased maintenance of the sewer system as a result of the
Food Service Establishments' inability to adequately remove FOG from its
wastewater discharge. This Section shall not be interpreted to allow the new
construction of, or existing Food Service Establishments undergoing remodeling
or change in operations to operate without an approved grease interceptor
unless the District has determined that it is impossible or impracticable to install
or operate a grease control interceptor for the subject facility under the provisions
of Section 2.6 of this Ordinance.
A. The Grease Disposal Mitigation Fee shall be established by ordinance or
resolution of the Board of Directors, and shall be based on the estimated
annual increased cost of maintaining the sewer system for inspection and
removal of FOG and other viscous or solidifying agents attributable to the
Food Service Establishment resulting from the lack of a grease
interceptor or grease control device.
WS&S -OXS:pj:#189145:08/06/04 15
B. The Grease Disposal Mitigation Fee may be waived or reduced on a no
less than an annual basis when the discharger demonstrates to the
reasonable satisfaction of the FOG Control Program Manager that they
had used best management and waste minimization practices on a
regular basis that has significantly reduced the introduction of FOG into
the sewer system.
C. The Grease Disposal Mitigation Fee may not be waived or reduced when
the Food Service Establishment does not comply with the minimum
requirements of this Ordinance and/or its discharge into the sewer system
in the preceding 12 months has caused or potentially caused or
contributed alone or collectively, in sewer blockage or SSO in the sewer
downstream, or surrounding the Food Service Establishment prior to the
waiver request.
2.9 SEWER SYSTEM OVERFLOWS. PUBLIC NUISANCE. ABATEMENT ORDERS
AND CLEANUP COSTS
Notwithstanding the three-year amortization period established in Section 2.5,
Food Service Establishments found to have contributed to a sewer blockage,
SSOs or any sewer system interferences resulting from the discharge of
wastewater or waste containing FOG, shall be ordered to install and maintain a
grease interceptor, and may be subject to a plan to abate the nuisance and
prevent any future health hazards created by sewer line failures and blockages,
SSOs or any other sewer system interferences. SSOs may cause threat and
injury to public health, safety, and welfare of life and property and are hereby
declared public nuisances. Furthermore, sewer lateral failures and SSOs caused
by Food Service Establishments alone or collectively, are the responsibility of the
private property owner or Food Service Establishment, and individual(s) as a
responsible officer or owner of the Food Service Establishment. If the District
must act immediately to contain and clean up an SSO caused by blockage of a
private or public sewer lateral or system serving a Food Service Establishment ,
or at the request of the property owner or operator of the Food Service
Establishment, or because of the failure of the property owner or Food Service
Establishment to abate the condition causing immediate threat of injury to the
health, safety, welfare, or property of the public, the District's costs for such
abatement may be entirely borne by the property owner or operator of the Food
Service Establishment, and individual(s) as a responsible officer or owner of the
Food Service Establishment(s) and may constitute a debt to the District and
become due and payable upon the District's request for reimbursement of such
costs.
WS&S-OXS:pj:#189145:08/06/04 16
ARTICLE 3 -FOG WASTEWATER DISCHARGE PERMITS FOR FOOD SERVICE
ESTABLISHMENTS
3.1 FOG WASTEWATER DISCHARGE PERMIT REQUIRED
A Food Service Establishments proposing to discharge or currently
discharging wastewater containing FOG into the District's sewer system
shall obtain a FOG Wastewater Discharge Permit from the District. B.
FOG Wastewater Discharge Permits shall be expressly subject to
all provisions of this Ordinance and all other regulations, charges for use,
and fees established by the District. The conditions of FOG Wastewater
Discharge Permits shall be enforced by the District in accordance with
this Ordinance and applicable State and Federal Regulations.
3.2 FOG WASTEWATER DISCHARGE PERMIT APPLICATION
A. Any person required to obtain a FOG Wastewater Discharge Permit shall
complete and file with the District prior to commencing or continuing
discharges, an application in a form prescribed by the District. The
applicable fees shall accompany this application. The applicant shall
submit, in units and terms appropriate for evaluation, the following
information at a minimum:
1. Name, address, telephone number, assessor's parcel number(s),
description of the Food Service Establishment, operation, cuisine,
service activities, or clients using the applicant's services.
2. (Whichever is applicable) Name, address of any and all
principals/owners/major shareholders of the Food Service
Establishment; Articles of Incorporation; most recent Report of the
Secretary of State; Business License.
3. Name and address of property owner or lessor and the property
manager where the Food Service Establishment is located.
4. Any other information as specified in the application form.
B. Applicants may be required to submit site plans, floor plans, mechanical
and plumbing plans, and details to show all sewers, FOG control device,
grease interceptor or other pretreatment equipment and appurtenances
by size, location, and elevation for evaluation.
C. Other information related to the applicant's business operations and
potential discharge may be requested to properly evaluate the permit
application.
D. After evaluation of the data furnished, the District may issue a FOG
Wastewater Discharge Permit, subject to terms and conditions set forth in
WS&S-OXS:pj:#189145:08/06/04 17
this Ordinance and as otherwise determined by the FOG Control Program
Manager to be appropriate to protect the District's sewer system.
3.3 FOG WASTEWATER DISCHARGE PERMIT CONDITIONS
The issuance of a FOG Wastewater Discharge Permit may contain any of the
following conditions or limits:
A. Limits on discharge of FOG and other priority pollutants.
B. Requirements for proper operation and maintenance of grease
interceptors and other grease control devices.
C. Grease interceptor maintenance frequency and schedule.
D. Requirements for implementation of Best Management Practices and
installation of adequate grease interceptor and/or grease control device.
E. Requirements for maintaining and reporting status of Best Management
Practices
F. Requirements for maintaining and submitting logs and records, including
wastehauling records and waste manifests.
G. Requirements to self-monitor.
H. Requirements for the Food Service Establishment to construct, operate
and maintain, at its own expense, FOG control device and sampling
facilities.
I. Additional requirements as otherwise determined to be reasonably
appropriate by the FOG Control Program Manager to protect the District's
system or as specified by other Regulatory Agencies.
J. Other terms and conditions, which may be reasonably applicable to
ensure compliance with this Ordinance.
3.4 FOG WASTEWATER DISCHARGE PERMIT APPLICATION FEE
The FOG Wastewater Discharge Permit Application fee shall be paid by the
applicant in an amount adopted by ordinance or resolution of the Board of
Directors of the District. Payment of permit application fee must be received by
the District upon submission of the permit application. A permittee shall also pay
any delinquent invoices in full prior to permit renewal.
3.5 FOG WASTEWATER DISCHARGE PERMIT MODIFICATION OF TERMS AND
CONDITIONS
A. The terms and conditions of an issued permit may be subject to
modification and change by the sole determination of the FOG Control
Program Manager during the life of the permit based on:
WS&S -OXS:pj:#189145:08/06/™ 18
1. The discharger's current or anticipated operating data;
2. The District's current or anticipated operating data;
3. Changes in the requirements of Regulatory Agencies which affect
the District; or
4. A determination by the FOG Control Program Manager that such
modification is appropriate to further the objectives of this
Ordinance.
B. The Permittee may request a modification to the terms and conditions of
an issued permit. The request shall be in writing stating the requested
change, and the reasons for the change. The FOG Control Program
Manager shall review the request, make a determination on the request,
and respond in writing.
C. The Permittee shall be informed of any change in the permit limits,
conditions, or requirements at least forty-five (45) days prior to the
effective date of change. Any changes or new conditions in the permit
shall include a reasonable time schedule for compliance.
3.6 FOG WASTEWATER DISCHARGE PERMIT DURATION AND RENEWAL
FOG Wastewater Discharge Permits shall be issued for a period not to exceed
four (4) years. At least 60 days prior to the expiration of the permit, the user shall
apply for renewal of the permit in accordance with the provisions of this Article 3.
3.7 EXEMPTION FROM FOG WASTEWATER DISCHARGE PERMIT
A limited food preparation establishment is not considered a Food Service
Establishment and is exempt from obtaining a FOG Wastewater Discharge
Permit. Exempted establishments shall be engaged only in reheating, hot holding
or assembly of ready to eat food products and as a result, there is no wastewater
discharge containing significant amount of FOG. A limited food preparation
establishment does not include any operation that changes the form, flavor, or
consistency of food.
3.8 NON-TRANSFERABILITY OF PERMITS
FOG Wastewater Discharge Permits issued under this Ordinance are for a
specific Food Service Establishment, for a specific operation and create no
vested rights.
A. No permit holder shall assign, transfer, sell any FOG Wastewater
Discharge Permit issued under this Ordinance nor use any such permit
for or on any premises or for facilities or operations or discharges not
expressly encompassed within the underlying permit.
B. Any permit which is transferred to a new owner or operator or to a new
facility is void.
WS&S -OXS:pj:#189145:08/06/04 19
3.9 FOG WASTEWATER DISCHARGE PERMIT CHARGE FOR USE
A charge to cover all costs of the District for providing the sewer service and
monitoring shall be established by Ordinance or Resolution of the Board of
Directors of the District.
WS&S -OXS:pj:#189145:08/06/04 20
ARTICLE 4 -FACILITIES REQUIREMENTS
4.1 DRAWING SUBMITTAL REQUIREMENTS
Upon request by the District:
A Food Service Establishments may be required to submit two copies of
facility site plans, mechanical and plumbing plans, and details to show all
sewer locations and connections. The submittal shall be in a form and
content acceptable to the District for review of existing or proposed
grease control device, grease interceptor, monitoring facilities, metering
facilities, and operating procedures. The review of the plans and
procedures shall in no way relieve the Food Service Establishments of
the responsibility of modifying the facilities or procedures in the future, as
necessary to produce an acceptable discharge, and to meet the
requirements of this Ordinance or any requirements of other Regulatory
Agencies.
B. Applicants may be required to submit site plans, floor plans, mechanical
and plumbing plans, and details to show all sewers, FOG control device,
grease interceptor or other pretreatment equipment and appurtenances
by size, location, and elevation for evaluation.
C. Food Service Establishments may be required to submit a schematic
drawing of the FOG control device, grease interceptor or other
pretreatment equipment, piping and instrumentation diagram, and
wastewater characterization report.
D. The District may require the drawings be prepared by a California
Registered Civil, Chemical, Mechanical, or Electrical Engineer.
4.2 GREASE INTERCEPTOR REQUIREMENTS
A All Food Service Establishments shall provide wastewater acceptable to
the District, under the requirements and standards established herein
before discharging to any public sewer. Any Food Service Establishment
required to provide FOG pretreatment shall install, operate, and maintain
an approved type and adequately sized grease interceptor necessary to
maintain compliance with the objectives of this Ordinance.
B. Grease interceptor sizing and installation shall conform to the current
edition of the Uniform Plumbing Code. Grease interceptors shall be
constructed in accordance with the design approved by the FOG Control
Program Manager and shall have a minimum of two compartments with
fittings designed for grease retention.
C. The grease interceptor shall be installed at a location where it shall be at
all times easily accessible for inspection, cleaning, and removal of
accumulated grease.
WS&S -OXS:pj:#189145:08/06/04 21
D. Access manholes, with a minimum diameter of 24 inches, shall be
provided over each grease interceptor chamber and sanitary tee. The
access manholes shall extend at least to finished grade and be designed
and maintained to prevent water inflow or infiltration. The manholes shall
also have readily removable covers to facilitate inspection, grease
removal, and wastewater sampling activities.
4.3 GREASE TRAP REQUIREMENTS
A. Food Service Establishments may be required to install grease traps in
the waste line leading from drains, sink, and other fixtures or equipment
where grease may be introduced into the sewer system in quantities that
can cause blockage.
B. Sizing and installation of grease traps shall conform to the current edition
of the California Plumbing Code.
C. Grease traps shall be maintained in efficient operating conditions by
removing accumulated grease on a daily basis.
D. Grease traps shall be maintained free of all food residues and any FOG
waste removed during the cleaning and scraping process.
E. Grease traps shall be inspected periodically to check for leaking seams
and pipes, and for effective operation of the baffles and flow regulating
device. Grease traps and their baffles shall be maintained free of all
caked-on FOG and waste. Removable baffles shall be removed and
cleaned during the maintenance process.
F. Dishwashers and food waste disposal units shall not be connected to or
discharged into any grease trap.
4.4 MONITORING FACILITIES REQUIREMENTS
A. The District may require the Food Service Establishments to construct
and maintain in proper operating condition at the Food Service
Establishment's sole expense, flow monitoring, constituent monitoring
and/or sampling facilities.
B. The location of the monitoring or metering facilities shall be subject to
approval by the FOG Control Program Manager.
C. Food Service Establishments may be required to provide immediate,
clear, safe and uninterrupted access to the FOG Control Program
Manager or inspectors to the Food Service Establishment's monitoring
and metering facilities.
D. Food Service Establishments may also be required by the FOG Control
Program Manager to submit waste analysis plans, contingency plans, and
meet other necessary requirements to ensure proper operation and
WS&S -OXS:pj:#189145:08/06/04 22
maintenance of the grease control device or grease interceptor and
compliance with this Ordinance.
E. No Food Service Establishment shall increase the use of water or in any
other manner attempt to dilute a discharge as a partial or complete
substitute for treatment to achieve compliance with this Ordinance and
the FOG Wastewater Discharge Permit.
4.5 REQUIREMENTS FOR BEST MANAGEMENT PRACTICES
A. All Food Service Establishments shall implement best management
practices in accordance with the requirements and guidelines established
by the District under its FOG Control Program in an effort to minimize the
discharge of FOG to the sewer system.
B. All Food Service Establishments shall be required, at a minimum, to
comply with the following Best Management Practices, when applicable:
1. Installation of drain screens. Drain screens shall be installed on
all drainage pipes in food preparation areas.
2. Segregation and collection of waste cooking oil. All waste cooking
oil shall be collected and stored properly in recycling receptacles
such as barrels or drums. Such recycling receptacles shall be
maintained properly to ensure that they do not leak. Licensed
wastehaulers or an approved recycling facility must be used to
dispose of waste cooking oil.
3. Disposal of food waste. All food waste shall be disposed of
directly into the trash or garbage, and not in sinks. Double-
bagging food wastes that have the potential to leak in trash bins is
highly recommended.
4. Employee training. Employees of the food service establishment
shall be trained by ownership/management periodically as
specified in the permit, on the following subjects:
a)
b)
c)
WS&S -OXS:pj:#189145:08/06/04
How to "dry wipe" pots, pans, dishware and work areas
before washing to remove grease.
How to properly dispose of food waste and solids in
enclosed plastic bags prior to disposal in trash bins or
containers to prevent leaking and odors.
The location and use of absorption products to clean under
fryer baskets and other locations where grease may be
spilled or dripped.
23
d) How to properly dispose of grease or oils from cooking
equipment into a grease receptacle such as a barrel or
drum without spilling.
Training shall be documented and employee signatures retained
indicating each employee's attendance and understanding of the
practices reviewed. Training records shall be available for review
at any reasonable time by the FOG Control Program Manager or
an inspector.
5. Maintenance of kitchen exhaust filters. Filters shall be cleaned as
frequently as necessary to be maintained in good operating
condition. The wastewater generated from cleaning the exhaust
filter shall be disposed properly.
6. Kitchen sianaae. Best management and waste minimization
practices shall be posted conspicuously in the food preparation
and dishwashing areas at all times.
4.6 GREASE INTERCEPTOR MAINTENANCE REQUIREMENTS
A. Grease Interceptors shall be maintained in efficient operating condition by
periodic removal of the full content of the interceptor which includes
wastewater, accumulated FOG, floating materials, sludge and solids.
B. All existing and newly installed grease interceptors shall be maintained in
a manner consistent with a maintenance frequency approved by the FOG
Control Program Manager pursuant to this section.
C. No FOG that has accumulated in a grease interceptor shall be allowed to
pass into any sewer lateral, sewer system, storm drain, or public right of
way during maintenance activities.
D. Food Service Establishments with grease interceptors may be required to
submit data and information necessary to establish the maintenance
frequency grease interceptors.
E. The maintenance frequency for all Food Service Establishments with a
grease interceptor shall be determined in one of the following methods:
1. Grease interceptors shall be fully pumped out and cleaned at a
frequency such that the combined FOG and solids accumulation
does not exceed 25% of the total design hydraulic depth of the
grease interceptor. This is to ensure that the minimum hydraulic
retention time and required available hydraulic volume is
maintained to effectively intercept and retain FOG discharged to
the sewer system.
WS&S-OXS:pj:#189145:08/06/04 24
2. All Food Service Establishments with a Grease Interceptor shall
maintain their grease interceptor not less than every 6 months.
3. Grease interceptors shall be fully pumped out and cleaned
quarterly when the frequency described in ( 1) has not been
established. The maintenance frequency shall be adjusted when
sufficient data have been obtained to establish an average
frequency based on the requirements described in (1) and
guidelines adopted pursuant to the FOG Control Program. The
District may change the maintenance frequency at any time to
reflect changes in actual operating conditions in accordance with
the FOG Control Program. Based on the actual generation of FOG
from the Food Service Establishment, the maintenance frequency
may increase or decrease.
4. The owner/operator of a Food Service Establishment may submit
a request to the FOG Control Program Manager requesting a
change in the maintenance frequency at any time. The Food
Service Establishment has the burden of responsibility to
demonstrate that the requested change in frequency reflects
actual operating conditions based on the average FOG
accumulation over time and meets the requirements described in
(1 ), and that it is in full compliance with the conditions of its permit
and this Ordinance. Upon determination by the FOG Control
Program Manager that requested revision is justified, the permit
shall be revised accordingly to reflect the change in maintenance
frequency.
5. If the grease interceptor, at any time, contains FOG and solids
accumulation that does not meet the requirements described in
(1), the Food Service Establishment shall be required to have the
grease interceptor serviced immediately such that all fats, oils,
grease, sludge, and other materials are completely removed from
the grease interceptor. If deemed necessary, the FOG Control
Program Manager may also increase the maintenance frequency
of the grease interceptor from the current frequency.
F. Wastewater, accumulated FOG, floating materials, sludge/solids, and
other materials removed from the grease interceptor shall be disposed off
site properly by wastehaulers in accordance with federal, state and/or
local laws.
WS&S -OXS:pj:#189145:08/06/04 25
ARTICLE 5 -MONITORING, REPORTING, NOTIFICATION, AND INSPECTION
REQUIREMENTS
5.1 MONITORING AND REPORTING CONDITIONS
A. Monitoring for Compliance with Permit Conditions and Reporting
Requirements
1. The FOG Control Program Manager may require periodic
reporting of the status of implementation of Best Management
Practices, in accordance with the FOG Control Program.
2. The FOG Control Program Manager may require visual
monitoring at the sole expense of the Permittee to observe the
actual conditions of the Food Service Establishment's sewer
lateral and sewer lines downstream.
3. The FOG Control Program Manager may require reports for
self-monitoring of wastewater constituents and FOG
characteristics of the Permittee needed for determining
compliance with any conditions or requirements as specified in the
FOG Wastewater Discharge Permit or this Ordinance. Monitoring
reports of the analyses of wastewater constituents and FOG
characteristics shall be in a manner and form approved by the
FOG Control Program Manager and shall be submitted upon
request of the FOG Control Program Manager. Failure by the
Permittee to perform any required monitoring, or to submit
monitoring reports required by the FOG Control Program
Manager constitutes a violation of this Ordinance and be cause for
the District to initiate all necessary tasks and analyses to
determine the wastewater constituents and FOG characteristics
for compliance with any conditions and requirements specified in
the FOG Wastewater Discharge Permit or in this Ordinance. The
Permittee shall be responsible for any and all expenses of the
District in undertaking such monitoring analyses and preparation
of reports.
4. Other reports may be required such as compliance schedule
progress reports, FOG control monitoring reports, and any other
reports deemed reasonably appropriate by the FOG Control
Program Manager to ensure compliance with this Ordinance.
B. Record Keeping Requirements
The Permittee shall be required to keep all manifests, receipts and
invoices of all cleaning, maintenance, grease removal of/from the grease
control device, disposal carrier and disposal site location for no less than
two years. The Permittee shall, upon request, make the manifests,
WS&S-OXS:pj:#189145:08/06/04 26
receipts and invoices available to any District representative, or inspector.
These records may include:
1. A logbook of grease interceptor, grease trap or grease control
device cleaning and maintenance practices.
2. A record of Best Management Practices being implemented
including employee training.
3. Copies of records and manifests of wastehauling interceptor
contents.
4. Records of sampling data and sludge height monitoring for FOG
and solids accumulation in the grease interceptors.
5. Records of any spills and/or cleaning of the lateral or sewer
system.
6. Any other information deemed appropriate by the FOG Control
Program Manager to ensure compliance with this Ordinance.
C. Falsifying Information or Tampering with Process
It shall be unlawful to make any false statement, representation, record,
report, plan or other document that is filed with the District, or to tamper
with or knowingly render inoperable any grease control device, monitoring
device or method or access point required under this Ordinance.
5.2 INSPECTION AND SAMPLING CONDITIONS
A. The FOG Control Program Manager may inspect or order the inspection
and sample the wastewater discharges of any Food Service
Establishment to ascertain whether the intent of this Ordinance is being
met and the Permittee is complying with all requirements. The Permittee
shall allow the District access to the Food Service Establishment
premises, during normal business hours, for purposes of inspecting the
Food Service Establishment's grease control devices or interceptor,
reviewing the manifests, receipts and invoices relating to the cleaning,
maintenance and inspection of the grease control devices or interceptor.
8. The FOG Control Program Manager shall have the right to place or order
the placement on the Food Service Establishment's property or other
locations as determined by the FOG Control Program Manager, such
devices as are necessary to conduct sampling or metering operations.
Where a Food Service Establishment has security measures in force, the
Permittee shall make necessary arrangements so that representatives of
the District shall be permitted to enter without delay for the purpose of
performing their specific responsibilities.
WS&S -OXS:pj:#189145:08/06/04 27
C. In order for the FOG Control Program Manager to determine the
wastewater characteristics of the discharger for purposes of determining
the annual use charge and for compliance with permit requirements, the
Permittee shall make available for inspection and copying by the District
all notices, monitoring reports, waste manifests, and records including,
but not limited to, those related to wastewater generation, and
wastewater disposal without restriction but subject to the confidentiality
provision set forth in this Ordinance. All such records shall be kept by the
Permittee a minimum of two (2) years.
5.3 RIGHT OF ENTRY
Persons or occupants of premises where wastewater is created or discharged
shall allow the FOG Control Program Manager, or District representatives,
reasonable access to all parts of the wastewater generating and disposal
facilities for the purposes of inspection and sampling during all times the
discharger's facility is open, operating, or any other reasonable time. No person
shall interfere with, delay, resist or refuse entrance to District representatives
attempting to inspect any facility involved directly or indirectly with a discharge of
wastewater to the District's sewer system. In the event of an emergency involving
actual or imminent sanitary sewer overflow, District's representatives may access
adjoining businesses or properties which share a sewer system with a Food
Service Establishment in order to prevent or remediate an actual or imminent
sanitary overflow.
5.4 NOTIFICATION OF SPILL
A. In the event a permittee is unable to comply with any permit condition due
to a breakdown of equipment, accidents, or human error or the Permittee
has reasonable opportunity to know that his/her/its discharge will exceed
the discharge provisions of the FOG Wastewater Discharge Permit or this
Ordinance, the discharger shall immediately notify the District by
telephone at the number specified in the Permit. If the material
discharged to the sewer has the potential to cause or result in sewer
blockages or SSOs, the discharger shall immediately notify the local
Health Department, City or County, and the District.
B. Confirmation of this notification shall be made in writing to the FOG
Control Program Manager at the address specified in the Permit no later
than five (5) working days from the date of the incident. The written
notification shall state the date of the incident, the reasons for the
discharge or spill, what steps were taken to immediately correct the
problem, and what steps are being taken to prevent the problem from
recurring.
C. Such notification shall not relieve the Permittee of any expense, loss,
damage or other liability which may be incurred as a result of damage or
loss to the District or any other damage or loss to person or property; nor
shall such notification relieve the Permittee of any fees or other liability
which may be imposed by this Ordinance or other applicable law.
WS&S-OXS:pj:#189145:08/06/04 28
5.5 NOTIFICATION OF PLANNED CHANGES
Permittee shall notify the District at least 60 days in advance prior to any facility
expansion/remodeling, or process modifications that may result in new or
substantially increased FOG discharges or a change in the nature of the
discharge. Permittee shall notify the District in writing of the proposed expansion
or remodeling and shall submit any information requested by the District for
evaluation of the effect of such expansion on Permittee's FOG discharge to the
sewer system.
WS&S -OXS:pj:#189145:08/06/04 29
ARTICLE 6 -ENFORCEMENT
6.1 PURPOSES AND SCOPE
A. The Board of Directors finds that in order for the District to comply with
the laws, regulations, and rules imposed upon it by Regulatory Agencies
and to ensure that the District's sewer facilities are protected and are able
to operate with the highest degree of efficiency, and to protect the public
health and environment, specific enforcement provisions must be adopted
to govern the discharges to the District's system by Food Service
Establishments.
B. To ensure that all interested parties are afforded due process of law and
that violations are resolved as soon as possible, the general policy of the
District is that:
1. Any determination relating to a notice of violation and Compliance
Schedule Agreement (CSA) will be made by the FOG Control
Program Manager, with a right of appeal by the permittee to the
General Manager pursuant to the procedures set forth in Section
6.12.
2. A permittee, or applicant for a permit may request the Board of
Directors of the District to hear an appeal of the General
Manager's decision pursuant to Section 6.13. Such request may
be granted or denied by the Board of Directors.
3. Any permit suspension or revocation recommended by the FOG
Control Program Manager will be heard and a recommendation
made to the General Manager or other person designated by the
General Manager with a right of appeal of the General Manager's
order by the permittee to the Board of Directors pursuant to the
provisions of Section 6.13.
C. The District, at its discretion, may utilize any one, combination, or all
enforcement remedies provided in Article 6 in response to any permit or
Ordinance violations.
6.2 DETERMINATION OF NONCOMPLIANCE WITH FOG WASTEWATER
DISCHARGE PERMIT CONDITIONS
A. Inspection Procedures
1. Inspection of Food Service Establishments shall be conducted in
the time, place, manner, and frequency determined at the sole
discretion of the FOG Control Program Manager.
2. Noncompliance with Best Management Practices, 25% Rule for
grease interceptors, maintenance frequency requirements for
WS&S -OXS:pj:#189145:08/06/04 30
grease interceptors, permit discharge conditions, or any discharge
provisions of this Ordinance may be determined by an inspection
of the Food Service Establishment.
B. Sampling Procedures
1. Sampling of Food Service Establishments shall be conducted in
the time, place, manner, and frequency determined at the sole
discretion of the District.
2. Non-compliance with mass emission rate limits, concentration
limits, permit discharge conditions, or any discharge provision of
this Ordinance may be determined by an analysis of a grab or
composite sample of the effluent of a user. Non-compliance with
mass emission rate limits shall be determined by an analysis of a
composite sample of the user's effluent, except that a grab sample
may be used to determine compliance with mass emission rate
limits when the discharge is from a closed (batch) treatment
system in which there is no wastewater flow into the system when
the discharge is occurring, the volume of wastewater contained in
the batch system is known, the time interval of discharge is
known, and the grab sample is homogeneous and representative
of the discharge.
3. Any sample taken from a sample point is considered to be
representative of the discharge to the public sewer.
C. Noncompliance Fees
Any permittee determined to be in noncompliance with the terms and
conditions specified in its permit or with any provision of this Ordinance
shall pay a noncompliance fee. The purpose of the noncompliance fee is
to compensate the District for costs of additional inspection and follow-up,
sampling, monitoring, laboratory analysis, treatment, disposal, and
administrative processing incurred as a result of the noncompliance, and
shall be in addition to and not in lieu of any penalties as may be assessed
pursuant to Sections 6.10 and 6.11. Noncompliance fees shall be in the
amount adopted by ordinance or resolution by the District's Board of
Directors.
6.3 COMPLIANCE SCHEDULE AGREEMENT (CSA)
A. Upon determination that a permittee is in noncompliance with the terms
and conditions specified in its permit or any provision of this Ordinance, or
needs to construct and/or acquire and install a grease control device or
grease interceptor, the FOG Control Program Manager may require the
permittee to enter into a CSA.
B. The issuance of a CSA may contain terms and conditions including but
not limited to requirements for installation of a grease control device,
WS&S-OXS:pj:#189145:08/06/04 31
grease interceptor and facilities, submittal of drawings or reports, audit of
waste hauling records, best management and waste minimization
practices, payment of fees, or other provisions to ensure compliance with
this Ordinance.
C. The FOG Control Program Manager shall not enter into a CSA until such
time as all amounts owed to the District, including user fees,
noncompliance sampling fees, or other amounts due are paid in full, or
an agreement for deferred payment secured by collateral or a third party,
is approved by the FOG Control Program Manager.
D. If compliance is not achieved in accordance with the terms and conditions
of a CSA during its term, the FOG Control Program Manager may issue
an order suspending or revoking the discharge permit pursuant to Section
6.4 or 6.5 of this Ordinance.
6.4 PERMIT SUSPENSION
A. The General Manager may suspend any permit when it is determined that
a permittee:
1. Fails to comply with the terms and conditions of a CSA order.
2. Knowingly provides a false statement, representation, record,
report, or other document to the District.
3. Refuses to provide records, reports, plans, or other documents
required by the District to determine permit terms or conditions,
discharge compliance, or compliance with this Ordinance.
4. Falsifies, tampers with, or knowingly renders inaccurate any
monitoring device or sample collection method.
5. Refuses reasonable access to the permittee's premises for the
purpose of inspection and monitoring.
6. Does not make timely payment of all amounts owed to the District
for user charges, permit fees, or any other fees imposed pursuant
to this Ordinance.
7. Causes interference, sewer blockages, or SSOs with the District's
collection, treatment, or disposal system.
8. Violates grease interceptor maintenance requirements, any
condition or limit of its discharge permit or any provision of the
District's Ordinance.
8. When the FOG Control Program Manager has reason to believe that
grounds exist for permit suspension, he/she shall give written notice
thereof by certified mail to the permittee setting forth a statement of the
facts and grounds deemed to exist, together with the time and place
WS&S -OXS:pj:#189145:08/06/04 32
where the charges shall be heard by the General Manager or his/her
designee. The hearing date shall be not less than fifteen (15) calendar
days nor more than forty-five (45) calendar days after the mailing of such
notice.
1. At the suspension hearing, the permittee shall have an opportunity
to respond to the allegations set forth in the notice by presenting
written or oral evidence. The hearing shall be conducted in
accordance with procedures established by the General Manager
and approved by the District's General Counsel.
2. If the General Manager designated a hearing officer, after the
conclusion of the hearing, the hearing officer shall submit a written
report to the General Manager setting forth a brief statement of
facts found to be true, a determination of the issues presented,
conclusions, and a recommendation.
3. Upon receipt of the written report of a hearing officer or conclusion
of the hearing, if the General Manager conducted the hearing, the
General Manager shall make his/her determination and should
he/she find that grounds exist for suspension of the permit, he/she
shall issue his/her decision and order in writing within thirty (30)
calendar days after the conclusion of the hearing. The written
decision and order of the General Manager shall be sent by
certified mail to the permittee or its legal counsel/representative at
the permittee's business address.
C. Effect
1. Upon an order of suspension by the General Manager becoming
final, the permittee shall immediately cease and desist its
discharge and shall have no right to discharge any wastewater
containing FOG directly or indirectly to the District's system for the
duration of the suspension. All costs for physically terminating
and reinstating service shall be paid by the permittee.
2. Any owner or responsible management employee of the permittee
shall be bound by the order of suspension.
3. An order of permit suspension issued by the General Manager
shall be final in all respects on the sixteenth (16th) day after it is
mailed to the permittee unless a request for hearing is filed with
the Board of Directors of the District pursuant to Section 6.13. no
later than 5:00 p.m. on the fifteenth (15th) day following such
mailing.
6.5 PERMIT REVOCATION
A. The General Manager may revoke any permit when it is determined that a
permittee:
WS&S-OXS:pj:#189145:08/06/04 33
1. Knowingly provides a false statement, representation, record,
report, or other document to the District.
2. Refuses to provide records, reports, plans, or other documents
required by the District to determine permit terms, conditions,
discharge compliance, or compliance with this Ordinance.
3. Falsifies, tampers with, or knowingly renders inaccurate any
monitoring device or sample collection method.
4. Fails to comply with the terms and conditions of permit suspension
or CSA.
5. Discharges effluent to the District's sewer system while its permit
is suspended.
6. Refuses reasonable access to the permittee's premises for the
purpose of inspection and monitoring.
7. Does not make timely payment of all amounts owed to the District
for user charges, permit fees, or any other fees imposed pursuant
to this Ordinance.
8. Causes interference, sewer blockages, or SSOs with the District
collection, treatment, or disposal system.
9. Violates grease interceptor maintenance requirements, any
condition or limit of its discharge permit or any provision of the
District's Ordinance.
B. Approval. When the FOG Control Program Manager has reason to
believe that grounds exist for the revocation of a permit, he/she shall give
written notice by certified mail thereof to the permittee setting forth a
statement of the facts and grounds deemed to exist together with the time
and place where the charges shall be heard by the General Manager or
his/her designee. The hearing date shall be not less than fifteen (15)
calendar days nor more than forty-five (45) calendar days after the
mailing of such notice.
1. At the hearing, the permittee shall have an opportunity to respond
to the allegations set forth in the notice by presenting written or
oral evidence. The revocation hearing shall be conducted in
accordance with the procedures established by the General
Manager and approved by the District's General Counsel.
2. If the General Manager designated a hearing officer, after the
conclusion of the hearing, the hearing officer shall submit a written
report to the General Manager setting forth a brief statement of
facts found to be true, a determination of the issues presented,
conclusions, and a recommendation.
WS&S -OXS:pj:#189145:08/06/04 34
3. Upon receipt of the written report by the hearing officer, or
conclusion of the hearing, if the General Manager conducted the
hearing, the General Manager shall make his/her determination
and should he/she find that grounds exist for permanent
revocation of the permit, he/she shall issue his/her decision and
order in writing within thirty (30) calendar days after the conclusion
of the hearing. The written decision and order of the General
Manager shall be sent by certified mail to the permittee or its legal
counsel/representative at the permittee's business address.
C. Effect
In the event the General Manager determines to not revoke the
permit, he/she may order other enforcement actions, including, but
not limited to, a temporary suspension of the permit, under terms
and conditions that he/she deems appropriate.
1. Upon an order of revocation by the General Manager becoming
final, the permittee shall permanently lose all rights to discharge
any wastewater containing FOG directly or indirectly to the
District's system. All costs for physical termination shall be paid
by the permittee.
2. Any owner or responsible management employee of the permittee
shall be bound by the order of revocation.
3. Any future application for a permit at any location within the
District by any person associated with an order of revocation will
be considered by the District after fully reviewing the records of
the revoked permit, which records may be the basis for denial of a
new permit.
4. An order of permit revocation issued by the General Manager
shall be final in all respects on the sixteenth (16th) day after it is
mailed to the permittee unless a request for hearing is filed with
the Board of Directors pursuant to Section 6.13 no later than 5:00
p.m. on the fifteenth (15th) day following such mailing.
6.6 DAMAGE TO FACILITIES OR INTERRUPTION OF NORMAL OPERATIONS
A. Any person who discharges any waste which causes or contributes to any
sewer blockage, SSOs, obstruction, interference, damage, or any other
impairment to the District's sewer facilities or to the operation of those
facilities shall be liable for all costs required to clean or repair the facilities
together with expenses incurred by the District to resume normal
operations. A service charge of twenty-five percent (25%) of District's
costs shall be added to the costs and charges to reimburse the District for
miscellaneous overhead, including administrative personnel and record
keeping. The total amount shall be payable within forty five (45) days of
invoicing by the District.
WS&S-OXS:pj:#189145:08/06/04 35
B. Any person who discharges a waste which causes or contributes to the
District violating its discharge requirements established by any Regulatory
Agency incurring additional expenses or suffering losses or damage to
the facilities, shall be liable for any costs or expenses incurred by the
District, including regulatory fines, penalties, and assessments made by
other agencies or a court.
6. 7 PUBLIC NUISANCE
Discharge of wastewater in any manner in violation of this Ordinance or of any
order issued by the FOG Control Program Manager or General Manager, as
authorized by this Ordinance, is hereby declared a public nuisance and shall be
corrected or abated as directed by the FOG Control Program Manager or
General Manager. Any person creating a public nuisance is guilty of a
misdemeanor.
6.8 TERMINATION OF SERVICE
A. The District, by order of the General Manager, may physically terminate
sewer service to any property as follows:
1. On a term of any order of suspension or revocation of a permit; or
2. Upon the failure of a person not holding a valid FOG Wastewater
Discharge Permit to immediately cease the discharge, whether
direct or indirect, to the District's sewer facilities after the notice
and process in Section 6.5 herein.
B. All costs for physical termination shall be paid by the owner or operator of
the Food Service Establishment or permittee as well as all costs for
reinstating service.
6.9 EMERGENCY SUSPENSION ORDER
A. The District may, by order of the General Manager, suspend sewer
service when the General Manager determines that such suspension is
necessary in order to stop an actual or impending discharge which
presents or may present an imminent or substantial endangerment to the
health and welfare of persons, or to the environment, or may cause
SSOs, sewer blockages, interference to the District's sewer facilities, or
may cause the District to violate any State or Federal Law or Regulation.
Any discharger notified of and subject to an Emergency Suspension
Order shall immediately cease and desist the discharge of all wastewater
containing FOG to the sewer system.
B. As soon as reasonably practicable following the issuance of an
Emergency Suspension Order, but in no event more than five (5)
business days following the issuance of such order, the General
Manager shall hold a hearing to provide the Food Service Establishment
or Permittee the opportunity to present information in opposition to the
issuance of the Emergency Suspension Order. Such a hearing shall not
WS&S -OXS:pj:#189145:08/06/04 36
stay the effect of the Emergency Suspension Order. The hearing shall be
conducted in accordance with procedures established by the General
Manager and approved by the District's General Counsel. The General
Manager shall issue a written decision and order within two (2) business
days following the hearing, which decision shall be sent by certified mail
to the Food Service Establishment or its legal counsel/representative at
that Food Service Establishment's business address. The decision of the
General Manager following the hearing shall be final and not appealable
to the Board, but may be subject to judicial review pursuant to Section
6.16.
6.10 CIVIL PENAL TIES
A. All users of the District's system and facilities are subject to enforcement
actions administratively or judicially by the District, U.S. EPA, State of
California Regional Water Quality Control Board, the County of Orange or
District Attorney. Said actions may be taken pursuant to the authority and
provisions of several laws, including but not limited to: (1) Federal Water
Pollution Control Act, commonly known as the Clean Water Act (33
U.S.C.A. Section 1251 et seq.); (2) California Porter-Cologne Water
Quality Control Act (California Water Code Section 13000 et seq.); (3)
California Hazardous Waste Control Law (California Health & Safety
Code Sections 25100 to 25250); (4) Resource Conservation and
Recovery Act of 1976 (42 U.S.C.A Section 6901 et seq.); and (5)
California Government Code, Sections 54739-54740.
B. In the event the District is subject to the payment of fines or penalties
pursuant to the legal authority and actions of other regulatory or
enforcement agencies based on a violation of law or regulation or its
permits, and said violation can be established by the District, as caused
by the discharge of any user of the District's system which is in violation
of any provision of the District's Ordinance or the user's permit, the
District shall be entitled to recover from the user all costs and expenses,
including, but not limited to, the full amount of said fines or penalties to
which it has been subjected.
C. Pursuant to the authority of California Government Code Sections 54739
-54740, any person who violates any provision of this Ordinance; any
permit condition, prohibition or effluent limit; or any suspension or
revocation order shall be liable civilly for a sum not to exceed $25,000.00
per violation for each day in which such violation occurs. Pursuant to the
authority of the Clean Water Act, 33 U.S.C. Section 1251 et seq., any
person who violates any provision of this Ordinance, or any permit
condition, prohibition, or effluent limit shall be liable civilly for a sum not to
exceed $25,000.00 per violation for each day in which such violation
occurs. The General Counsel of the District, upon request of the General
Manager, shall petition the Superior Court to impose, assess, and recover
such penalties, or such other penalties as the District may impose,
assess, and recover pursuant to Federal and/or State legislative
authorization.
WS&S-OXS:pj:#189145:08/06/04 37
D. Administrative Civil Penalties
1. Pursuant to the authority of California Government Code Sections
54740.5 and 54740.6, the District may issue an administrative
complaint to any person who violates:
a) any provision of this Ordinance;
b) any permit condition, prohibition, or effluent limit; or
c) any suspension or revocation order.
2. The administrative complaint shall be served by personal delivery
or certified mail on the person and shall inform the person that a
hearing will be conducted, and shall specify a hearing date within
sixty (60) days following service. The administrative complaint will
allege the act or failure to act that constitutes the violation of the
District's regulations, the provisions of law authorizing civil liability
to be imposed, and the proposed civil penalty. The matter shall
be heard by the General Manager or his/her designee. The
person to whom an administrative complaint has been issued may
waive the right to a hearing, in which case a hearing will not be
conducted.
3. At the hearing, the person shall have an opportunity to respond to
the allegations set forth in the administrative complaint by
presenting written or oral evidence. The hearing shall be
conducted in accordance with the procedures established by the
General Manager and approved by the District's General Counsel.
4. If the General Manager designated a hearing officer, after the
conclusion of the hearing, the hearing officer shall submit a written
report to the General Manager setting forth a brief statement of
the facts found to be true, a determination of the issues presented,
conclusions, and a recommendation.
5. Upon receipt of the written report by the hearing officer, or
conclusion of the hearing if the General Manager conducted the
hearing, the General Manager shall make his/her determination
and should he/she find that grounds exist for assessment of a civil
penalty against the person, he/she shall issue his/her decision and
order in writing within thirty (30) calendar days after the conclusion
of the hearing .
6. If, after the hearing or appeal, if any, it is found that the person
has violated reporting or discharge requirements, the General
Manager or Board of Directors may assess a civil penalty against
that person. In determining the amount of the civil penalty, the
General Manager or Board of Directors may take into
consideration all relevant circumstances, including but not limited
to the extent of harm caused by the violation, the economic benefit
WS&S -OXS:pj:#189145:08/06/04 38
derived through any non-compliance, the nature and persistence
of the violation, the length of time over which the violation occurs,
and corrective action, if any, attempted or taken by the person
involved.
7. Civil penalties may be assessed as follows:
a) In an amount which shall not exceed two thousand dollars
($2,000.00) for each day for failing or refusing to furnish
required reports;
b) In an amount which shall not exceed three thousand
dollars ($3,000.00) for each day for failing or refusing to
timely comply with any compliance schedules established
by the District;
c) In an amount which shall not exceed five thousand dollars
($5,000.00) per violation for each day of discharge in
violation of any waste discharge limit, permit condition, or
requirement issued, reissued, or adopted by the District;
d) In any amount which does not exceed ten dollars ($10.00)
per gallon for discharges in violation of any suspension,
revocation, cease and desist order or other orders, or
prohibition issued, reissued, or adopted by the District;
8. An order assessing administrative civil penalties issued by the
General Manager shall be final in all respects on the thirty-first
(31st) day after it is served on the person unless an appeal and
request for hearing is filed with the Board of Directors pursuant to
Section 6.13 no later than the thirtieth (30th) day following such
mailing. An order assessing administrative civil penalties issued
by the Board of Directors shall be final upon issuance.
9. Copies of the administrative order shall be served on the party
served with the administrative complaint, either by personal
service or by registered mail to the person at his/her/its business
or residence address, and upon other persons who appeared at
the hearing and requested a copy of the order.
10. Any person aggrieved by a final order issued by the Board of
Directors, after granting review of the order of the General
Manager, may obtain review of the order of the Board of Directors
in the superior court, pursuant to Government Code Section
54740.6, by filing in the court a petition for writ of mandate within
thirty (30) days following the service of a copy of the decision or
order issued by the Board of Directors.
11. Payment of any order setting administrative civil penalties shall be
made within thirty (30) days of the date the order becomes final.
WS&S-OXS:pj:#189145:08/06/04 39
The amount of any administrative civil penalties imposed shall
constitute a debt to the District.
12. No administrative civil penalties shall be recoverable for any
violation for which the District has recovered civil penalties
through a judicial proceeding filed pursuant to Government Code
Section 54 7 40.
6.11 CRIMINAL PENAL TIES
Any person who violates any prov1s1on of this Ordinance is guilty of a
misdemeanor, which upon conviction is punishable by a fine not to exceed
$1,000.00, or imprisonment for not more than 6 months, or both. Each violation
and each day in which a violation occurs may constitute a new and separate
violation of this Ordinance and shall be subject to the penalties contained herein.
6.12 APPEALS TO GENERAL MANAGER
A. Any Food Service Establishment, permit applicant or permittee affected
by any decision, action or determination made by the FOG Control
Program Manager or notice of violation issued by any District inspector
may file with the General Manager a written request for an appeal
hearing. The request must be received by the District within fifteen (15)
days of mailing of notice of the decision, action, or determination of the
FOG Control Program Manager to the appellant. The request for hearing
shall set forth in detail all facts supporting the appellant's request.
B. The General Manager shall, within fifteen (15) days of receiving the
request for appeal, designate a Department Head or other person to hear
the appeal and provide written notice to the appellant of the hearing date,
time and place. The hearing date shall not be more than thirty (30) days
from the mailing of such notice by certified mail to the appellant unless a
later date is agreed to by the appellant. If the hearing is not held within
said time due to actions or inactions of the appellant, then the staff
decision shall be deemed final.
C. At the hearing, the appellant shall have the opportunity to present
information supporting its position concerning the FOG Control Program
Manager's decision, action or determination. The hearing shall be
conducted in accordance with procedures established by the General
Manager and approved by the District's General Counsel.
D. After the conclusion of the hearing, the Department Head (or other
designee) shall submit a written report to the General Manager setting
forth a brief statement of facts found to be true, a determination of the
issues presented, conclusions, and a recommendation whether to uphold,
modify or reverse the FOG Control Program Manager's original decision,
action or determination. Upon receipt of the written report, the General
Manager shall make his/her determination and shall issue his/her
decision and order within thirty (30) calendar days of the hearing by
his/her designee. The written decision and order of the General Manager
WS&S -OXS:pj:#189145:08/06/04 40
·r
t
shall be sent by certified mail to the appellant or its legal
counsel/representative at the appellant's business address.
The order of the General/City Manager shall be final in all respects on the
sixteenth (16th) day after it is mailed to the appellant unless a request for
hearing is filed with the Board of Directors pursuant to Section 6.13, no
later than 5:00 p.m. on the fifteenth day following such mailing.
6.13 APPEALS TO THE BOARD OF DIRECTORS
A. Any Food Service Establishment, permit applicant, or permittee adversely
affected by a decision, action, or determination made by the General
Manager may, prior to the date that the General Manager's order
becomes final, file a written request for hearing before the Board of
Directors accompanied by an appeal fee in the amount established by a
separate resolution of the District's Board of Directors. The request for
hearing shall set forth in detail all the issues in dispute for which the
appellant seeks determination and all facts supporting appellant's
request.
No later than sixty (60) days after receipt of the request for hearing, the
Board of Directors shall either set the matter for a hearing, or deny the
request for a hearing.
A hearing shall be held by the Board of Directors within sixty-five (65)
days from the date of determination granting a hearing, unless a later
date is agreed to by the appellant and the Board of Directors. If the
matter is not heard within the required time, due to actions or inactions of
the appellant, the General Manager's order shall be deemed final.
B. The Board of Directors shall grant all requests for a hearing on appeals
concerning permit suspension, revocation, or denial. Whether to grant or
deny the request for a hearing on appeals of other decisions of the
General Manager shall be within the sole discretion of the Board of
Directors.
C. The appeal fee shall be refunded if the Board of Directors denies a
hearing or reverses or modifies, in favor of the appellant, the order of the
General Manager. The fee shall not be refunded if the Board of Directors
denies the appeal.
D. After the hearing, the Board of Directors shall make a determination
whether to uphold, modify, or reverse the decision, action, or
determination made by the General Manager.
The decision of the Board of Directors shall be set forth in writing within
sixty-five (65) days after the close of the hearing and shall contain a
finding of the facts found to be true, the determination of issues
presented, and the conclusions. The written decision and order of the
Board of Directors shall be sent by certified mail to the appellant or its
legal counsel/representative at the appellant's business address.
WS&S -OXS:pj:#189145:08/06/04 41
The order of the Board of Directors shall be final upon its adoption. In the
event the Board of Directors fails to reverse or modify the General
Manager's order, it shall be deemed affirmed.
6.14 PAYMENT OF CHARGES
A. Except as otherwise provided, all fees, charges and penalties established
by this Ordinance are due and payable upon receipt of notice thereof. All
such amounts are delinquent if unpaid forty-five ( 45) days after date of
invoice.
B. Any charge that becomes delinquent shall have added to it a penalty in
accordance with the following:
1. Forty-six (46) days after date of invoice, a basic penalty of ten
percent (10%) of the base invoice amount, not to exceed a
maximum of $1,000.00; and
2. A penalty of one and one-half percent (1.5%) per month of the
base invoice amount and basic penalty shall accrue from and after
the forty-sixth (46th) day after date of invoice.
C. Any invoice outstanding and unpaid after ninety (90) days shall be cause
for immediate initiation of permit revocation proceedings or immediate
suspension of the permit.
D. Penalties charged under this Section shall not accrue to those invoices
successfully appealed, provided the District receives written notification of
said appeal prior to the payment due date.
E. Payment of disputed charges is still required by the due date during
District review of any appeal submitted by permittees.
Collection of Delinquent Accounts
Collection of delinquent accounts shall be in accordance with the District's policy
resolution establishing procedures for collection of delinquent obligations owed to
the District, as amended from time to time by the Board of Directors. Any such
action for collection may include an application for an injunction to prevent
repeated and recurring violations of this Ordinance.
6.15 FINANCIAL SECURITY/AMENDMENTS TO PERMIT
A. Delinquent Accounts
The District may require an amendment to the permit of any Permittee
who fails to make payment in full of all fees and charges assessed by the
District, including reconciliation amounts, delinquency penalties, and
other costs or fees incurred by the Permittee.
B. Bankruptcy
WS&S-OXS:pj:#189145:08/06/04 42
t
Every Permittee filing any legal action in any court of competent
jurisdiction, including the United States Bankruptcy Court, for purposes of
discharging its financial debts or obligations or seeking court-ordered,
protection from its creditors, shall, within ten (10) days of filing such
action, apply for and obtain the issuance of an amendment to its permit.
C. Security
An amendment to a waste discharge permit issued, may be conditioned
upon the Permittee depositing financial security in an amount equal to the
average total fees and charges for two (2) calendar quarters during the
preceding year. Said deposit shall be used to guarantee payment of all
fees and charges incurred for future services and facilities furnished by
District and shall not be used by the District to recover outstanding fees
and charges incurred prior to the Permittee filing and receiving protection
from creditors in the United States Bankruptcy Court.
D. Return of Security
In the event the Permittee makes payment in full within the time
prescribed by this Ordinance of all fees and charges incurred over a
period of two (2) years following the issuance of an amendment to the
permit, the District shall either return the security deposit posted by the
Permittee or credit their account.
6.16 JUDICIAL REVIEW
A. Pursuant to Section 1094.6 of the California Code of Civil Procedure, the
District hereby enacts this part to limit to ninety (90) days following final
decisions in adjudicatory administrative hearings the time within which an
action can be brought to review such decisions by means of
administrative mandamus.
B. Definitions
As used in this Section, the following terms and words shall have the
following meanings:
1. Decision shall mean and include adjudicatory administrative
decisions that are made after hearing, or after revoking,
suspending, or denying an application for a permit.
2. Complete Record shall mean and include the transcript, if any
exists, of the proceedings, all pleadings, all notices and orders,
any proposed decision by the District's officers, agents, or
employees, the final decision, all admitted exhibits, all rejected
exhibits in the possession of the District or its officers, agents or
employees, all written evidence, and any other papers in the case.
C. Time Limit for Judicial Review. Judicial review of any decision of the
District or its officer or agent may be made pursuant to Section 1094.5 of
WS&S-OXS:pj:#189145:08/06/04 43
the Code of Civil Procedure only if the petition for writ of mandate is filed
not later than the ninetieth (90th) day following the date on which the
decision becomes final. If there is no provision for reconsideration in the
procedures governing the proceedings or if the date is not otherwise
specified, the decision is final on the date it is made. If there is provision
for reconsideration, the decision is final upon the expiration of the period
during which such reconsideration can be sought; provided that if
reconsideration is sought pursuant to such provision the decision is final
for the purposes of this Section on the date that reconsideration is
rejected.
D. The complete record of the proceedings shall be prepared by the G>istrict
officer or agent who made the decision and shall be delivered to the
petitioner within ninety (90) days after he/she has filed written request
therefor. The District may recover from the petitioner its actual costs for
transcribing or otherwise preparing the record.
E. If the petitioner files a request for the record within ten (10) days after the
date the decision becomes final, the time within which a petition, pursuant
to Section 1094.5 of the Code of Civil Procedure, may be filed shall be
extended to not later than the thirtieth (30th) day following the date on
which the record is either personally delivered or mailed to the petitioner
or the petitioner's attorney of record, if appropriate.
F. In making a final decision, the District shall provide notice to the party that
Section 1094.6 of the Code of Civil Procedure governs the time within
which judicial review must be sought.
G. Notwithstanding the foregoing in this Section 6.16, and pursuant to
Government Code Section 54740.6, judicial review of an order of the
Board of Directors imposing administrative civil penalties pursuant to
Section 6.1 O.D may be made only if the petition for writ of mandate is filed
not later than the thirtieth (30th) day following the day on which the order
of the Board of Directors becomes final.
WS&S-OXS:pj:#189145:08/06/04 44
••
ARTICLE 7 -SEVERABILITY
If any section, subsection, subdivision, sentence, clause or phrase of this Ordinance is
for any reason held to be unconstitutional or otherwise invalid, such invalidity shall not
affect the validity of this entire Ordinance or any of the remaining portions hereof. The
Board of Directors hereby declares that it would have passed this Ordinance, and each
section, subsection, subdivision, sentence, clause or phrase hereof, irrespective of the
fact that any one or more sections, subsections, subdivisions, sees, clauses or phrases
be declared unconstitutional or otherwise invalid.
ARTICLE 8 -CALIFORNIA BUILDING STANDARDS LAW FINDINGS
Pursuant to the provisions of the California Building Standards Law, California Health
and Safety Code§§ 18941.5, 17958, 17958.5 and 17958.7, the Board hereby finds that
the amendments to the State Building Standards and Housing Laws, more particularly
the California Plumbing Code, adopted herein are necessary because of climatic,
geological or topographical conditions of property in the District's jurisdiction, and as
more specifically described below.
A. Articles 2 and 4 modify the authority and discretion of the "Administrative
Authority" of Section 1014.1 of the 2001 California Plumbing Code by
requiring all Food Service Establishments to install and operate a grease
control device, which may be a grease interceptor or grease trap, if no
other device, mechanism, or process is found to successfully trap or
collect or treat FOG prior to it being discharged into the sewer system.
B. Article 4 modifies the general maintenance requirements for grease
interceptors of Section 1014.6 of the 2001 California Plumbing Code and
establishes more specific maintenance requirements.
FINDINGS FOR "A" AND "B": The District's topography and geography
that has created the Santa Ana Watershed and the District's proximity to
the Pacific Ocean coupled with the general waste discharge requirements
imposed by the RWQCB require the strict compliance with grease control
device regulations to prevent sewer system overflows that threaten the
health and safety of the public within the immediate vicinity of the
overflow and downstream to the local beaches.
C. ADMINISTRATIVE-PROCEDURAL AMENDMENTS. Additional
amendments and deletions to the California Plumbing Code are found to
be administrative or procedural and are found to be reasonable and
necessary to safeguard life and property within the District.
WS&S -OXS:pj:#189145:08/06/04 45
ARTICLE 9 -FILING WITH CALIFORNIA BUILDING STANDARDS COMMISSION
A copy of this Ordinance shall be filed with the California Building Standards
Commission and the California Department of Housing and Community Development by
the Secretary of the Board as required by State law (Health & Safety Code Section
17958.7).
ARTICLE 10 -EFFECTIVE DATE
This Ordinance shall take effect immediately upon its adoption and a summary shall be
published in a newspaper of general circulation as provided by law.
PASSED AND ADOPTED by the Board of Directors of Orange County Sanitation District
this day of , 2004.
Attest:
Secretary of the Board of Directors
Orange County Sanitation District
Chair, Board of Directors
Orange County Sanitation District
Thomas L. Woodruff, General Counsel
Orange County Sanitation District
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1004\ltem 16.FOG Ordinance-Att 1.doc
WS&S -OXS:pj:#189145:08/06/04 46
..
I
f FAHR COMMITTEE Meeting Date To Bd . of Dir.
10/13/04 10/27/04
AGENDA REPORT Item Number Item Number
FAHR04-91 17
Orange County Sanitation District
FROM: Gary Streed , Director of Finance/Treasurer
SUBJECT: PERMIT USER RATES FOR FLOW, BIOCHEMICAL OXYGEN DEMAND
AND SUSPENDED SOLIDS
GENERAL MANAGER'S RECOMMENDATION
Recommend to the Board of Directors to adopt revised rates to be charged Permit
Users for flow, biochemical oxygen demand (BOD) and suspended solids (SS), based
upon the Validated Capital Improvement Program (CIP) that includes meeting
secondary treatment standards but excludes projects for additional capacity and based
upon the actual operations & maintenance expense ratios and provides for the
continuation of a total fee reduction for actual property taxes allocated to the District for
each Permit User.
SUMMARY
In July, staff advised the Board that we discovered an inappropriate credit had reduced
the calculation of the rates that individual Permit Users pay to compute their annual
sewer service charge based upon their actual flow, BOD and SS discharge. The total
funds that needed to be raised for the year had been reduced by the total property taxes
that were expected , while each Permit User's actual annual bill was subsequently
reduced by their actual property taxes allocated to the District. Correcting this double
credit was expected to recover approximately $1 .7 million per year.
In order to brief the Board in July, the staff work behind the recommended solution to
this property tax credit calculation was rushed ; the immediate computation was
addressed , but the opportunity to review the entire calculation was deferred . In the time
between the first reading of the proposed Ordinance and the second reading in August,
staff completed that analysis , developed additional recommendations and asked that
consideration of the Ordinance be postponed until October when a detailed explanation
of the calculation and the formula could be provided .
At the September FAHR Committee meeting , staff presented a revised formula and
rates that were based upon the Validated Capital Improvement Plan through 2020 that
was developed subsequent to the Board 's decision to meet secondary treatment
discharge standards, the actual O&M costs of 2003-04, and the budgetary requirements
for 2004-05 . This formula excluded the reduction of total needs by property tax
receipts . The Committee was generally supportive of this methodology. The remaining
question was whether or not it was appropriate to include the cost of CIP projects for
additional capacity in these rates .
Staff has reviewed that question and determined that additional capacity projects should
be excluded from the calculation . In 2003-04 , the Board adopted a new methodology to
calculate Capital Facilities Capacity Charges (CFCCs) that is based entirely upon the
projected increased flow and demand and the cost of facilities to meet those
requirements . Additionally , Permit Users who exceed their baseline capacity rights are
required to pay Supplemental Capital Facilities Capacity Charges to fund the additional
facilities that they will require . Because these additional capacity projects are now
funded from special fees , staff believes it is inappropriate to include them in the Permit
User fee rates .
This report will explain the process of calculating the Permit User rates, will discuss the
various assumptions involved , will evaluate alternative calculation methods and will
present the staff recommendation for a thorough discussion by the FAHR Committee .
PRIOR COMMITTEE/BOARD ACTIONS
1. The Committee reviewed and recommended rates for 2004-05 in April , 2004, and
those rates were adopted by the Board .
2 . In July 2004, the Board introduced Ordinance No. OCSD-24 for first reading .
3. In August 2004 , the Board deferred consideration of adoption of Ordinance No .
OCSD-24 until October 2004.
4 . In September 2004, the Committee reviewed alternative rate calculation methods
and requested evaluation of an additional alternative.
PROJECT/CONTRACT COST SUMMARY
The financial cost to the District of implementing the staff recommendation will be
minimal. A notice of the proposed rates will need to be mailed to every Permit User
informing them of the change that is proposed and the rates that are projected for
2004-05, 2005-06 , 2006-07 and 2007-08 . Of course , the Board will consider these
rates separately each year along with the annual sewer service fee rates . Providing the
notice through 2007-08 , will put all users on the same notification schedule .
The cost to some Permit Users will be significant. A schedule is attached that estimates
the total annual cost to each Permit User during the planning period .
There will be additional , but unquantified costs to the District from explaining these
costs to various Permit Users.
There will be additional revenues to the District from the Permit Users who have
benefited from the inappropriate reduction of rates by the amount of property tax
receipts .
H·\dep tlagenda\Board Agenda Repon s\2004 Board Agenda Repons\1 004\ltem 17 .0rdinance 2 4 doc
Revised 06/04/03 Page 2
• ,
BUDGET IMPACT
~ This item has been budgeted. (Line item: )
D This item has been budgeted, but there are insufficient funds.
D This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
Since the inception of the Permit User Fee program in 1970, users of the District's
system that discharge high volumes or high strength wastewater have been required to
obtain a discharge permit (either a Class I or Class II Permit) and to pay extra fees for
the cost of service. The fees are initially calculated on the basis of actual flow, BOD
and SS discharged to the sewer and subsequently reduced by the actual property taxes
they have paid to the District. This practice was intended to ensure that these users
paid their actual cost of service through a combination of user fees and property taxes.
There are approximately 500 Permit Users that pay for sewer services based upon their
actual flow, BOD and SS. The individual user rate that was adopted for 2004-05 for
each of these parameters was calculated based upon net revenue requirements for
O&M and the CIP, after subtracting other projected revenues, including property taxes,
from our total revenue or spending requirements. In July, staff recommended that it
was appropriate to modify the computation of the rates for flow, BOD and SS so that
Permit Users were not allowed two reductions for property taxes.
The attached staff report provides a very detailed accounting of the steps involved to
calculate the individual rates for flow, BOD and SS for Operations & Maintenance
(O&M) expenses, the CIP and for Certificate of Participation (COP) Service. The most
important factors or allocations that are used in the calculations are shown in the
following table.
Cost Parameter Allocations
Collection Treatment& Collection Treatment&
System O&M Disposal O&M System CIP Disposal CIP COP Service
Flow 50% 12% 90% 35% 50%
BOD 34% 10% 33% 27%
SS 50% 54% 32% 23%
ReQuirement $22,605, 790 $86,614, 140 $5,199,433 $19, 799,969 $38,757,502
The theory, philosophy, formula and allocations were used to estimate the individual
Permit User rates for 2004-05 and the following three fiscal years. All of these
calculations are based upon the cash flow projections in the 2004-05 budget. The
actual rates for the years beyond 2004-05 will be brought to the Board as a part of each
year's financial actions; they are not a part of this action.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\1004\ltem 17.0rdinance 24.doc
Revised: 06/04/03 Page3
Adopted Proposed Estimated Estimated Estimated
Description 2004-05 2004-05 2005-06 2006-07 2007-08
Flow per mg $368.58 $577.30 $637.55 $711.27 $773.32
BOD per 1000 lb $248.55 $270.68 $288.50 $311.21 $330.53
SS per 1000 lb $238.45 $414.27 $432.14 $454.19 $473.50
Avg. Permit User @ $18,784.67 $25,395.71 $27,213.12 $29,475.80 $31,400.84
14 mg, 40 k#, 16 k#
Estimated Total $8,490,633.10 $11,478,852.42 $12,300,318.42 $13,323,050.89 $14, 193, 168.90
Fees Using 2002-03
Quant.
ALTERNATIVES
Alternatives are discussed in the attached staff report and include different effective
dates for the Permit User rates, changing the allocation of costs to flow, BOD and SS in
some or all cost categories, and various reductions to the budgeted requirements.
CEQA FINDINGS
N/A
ATTACHMENTS
1. Staff Report
2. Schedule of Estimated Impact on Permit Users By Flow, BOD and SS
3. Schedule of Estimated Impact on Permit Users to 2007-08
4. Permit User Rate Calculation Model (4)
5. Average "Cash-Funded" Validated Capital Improvement Program
6. Allocation of 2003-04 Treatment and Disposal Costs to Flow, BOD and SS
7. Allocation of Validated Capital Improvement Program to Flow, BOD and SS
8. Expense and Cost Allocations
9. Memo from General Counsel dated October 20, 2004
10. First page of proposed Ordinance No. OCSD-24
11. Revised Table G to proposed Ordinance No. OCSD-24
GGS
H:\depl\agenda\Board Agenda Reports\2004 Board Agenda Reports\1004\llem 17.0rdinance 24.doc
Revised; 06/04/03 Page4
October 13, 2004
STAFF REPORT
Calculation of Permit User Rates
For Flow, Biochemical Oxygen Demand and Suspended Solids
Since the inception of the Permit User Fee program in 1970, users of the
District's system that discharge high volumes or high strength wastewater have
been required to obtain a discharge permit (either a Class I or Class II Permit)
and to pay extra fees for the cost of service. These extra fees are initially
calculated on the basis of actual flow, biochemical oxygen demand (BOD) and
suspended solids (SS) discharged to the sewer and that calculated total is
subsequently reduced by the actual property taxes they have paid to the District.
This practice was intended to ensure that these users paid their actual cost of
service through a combination of user fees and property taxes.
There are approximately 500 Permit Users that pay for sewer services based
upon their actual flow, BOD and SS discharge to the sewer. The individual user
rate that was adopted for 2004-05 for each of these parameters was calculated
based upon net revenue requirements for operations and maintenance (O&M)
and the validated capital improvement program (CIP), after subtracting other
projected revenues, including property taxes, from our total revenue and
spending requirements. In July, staff recommended that it was appropriate to
modify the computation of the rates for flow, BOD and SS so that Permit Users
were not allowed two reductions for property taxes.
During the past few months, staff has re-evaluated each of the assumptions that
are involved in calculating these rates. Central to this process was the goal to
verify how our costs are allocated to, or based upon, flow, BOD and SS. This
report contains the results of those evaluations. Attached to this report is a
spreadsheet that calculates the proposed rates for 2004-05. Each of the lines in
this spreadsheet is numbered for reference and those line numbers are included
in the descriptions that follow.
Component Costs
There are five component costs that must be funded each year. These are: O&M
in the collection system, O&M in the treatment plants, CIP in the collection
system, CIP in the treatment plants and certificates of participation (COP)
OCSD r. P.O. Box 8127 o Fountain Valley, CA 92728-8127 rJ (714) 962-2411
Calculation of Permit User Rates
Page 2of6
October 13, 2004
service. Each of these components must be allocated to flow, BOD or SS before
rates can be calculated. A column is included in the attached spreadsheet for
each of these types of costs.
O&M in the collection system has historically been allocated 100% to flow
because there is no treatment or removal of BOD or SS in the sewers. A closer
review of the sewage transportation process and of a change in budget
preparation methods has led to a change in these allocations. Line cleaning
expenses are allocated to solids, the new FOG program is allocated 70% to
solids and the odor control program is a,llocated 90% to solids. When these
allocation percentages are applied to the 2004-05 budget, the resultant overall
percentages are 50% flow and 50% solids. (Column A, lines 1, 7, 8-11)
CIP in the collection system has also historically been allocated 100% to flow.
However, because some of the rehabilitation, refurbishment and replacement
work in the sewers has been caused by gasses in the wastewater that are
formed from the BOD, 10% of the collection system CIP is allocated to BOD in
accordance with recommendations in the Interim Strategic Plan Update.
Adjustments to the budgeted CIP are discussed later in this report. (Column B,
lines 1, 7, 8-11 )
O&M in the treatment plant allocation percentages are calculated each year
based upon the actual expenses from the year before. Each of the major unit
processes (preliminary treatment, primary treatment, secondary treatment, solids
disposal, effluent disposal) are allocated appropriately to flow, BOD or SS in
order to calculate an average allocation for the year. Based upon the actual
costs for 2003-04, the 2004-05 budget for treatment plant expenses is allocated
12% to flow, 33% to BOD and 54% to SS. (Column C, lines 1, 7, 8-11)
CIP in the treatment plant is the most difficult to properly allocate. Every Master
Plan or Strategic Plan requires the engineering team to evaluate every project
that is proposed for the planning period and to develop the appropriate allocation
ratio for that project. For example, a headworks project would be allocated 75%
to flow -5% to BOD -20% to SS, while a secondary treatment project would be
allocated 93% to BOD-7% SS. When all of the projects have been allocated, a
weighted average is determined for the CIP through the planning period. These
weighted averages may differ for each Strategic Plan based upon the level of
treatment proposed or other major Board decisions. The result of this effort for
the Validated Capital Improvement Program in 2003 for the treatment plants,
after removing the projects for new capacity, is 35% to flow-33% to BOD-32%
to SS. Adjustments to the budgeted CIP are discussed later in this report.
(Column D, lines 1, 7, 8-11}
COP service is the principal and interest we pay on the money we borrow in the
municipal finance market. The District borrows only for the CIP, not for O&M.
t
Calculation of Permit User Rates
Page 3of6
October 13, 2004
Because the COP (debt) service is related exclusively to the CIP and to the
entire CIP, the annual payments are allocated to flow, BOD and SS based on the
weighted average of the CIP for the collection system and for the treatment
plants after removing the projects for additional capacity. This average is 50% to
flow-27% to BOD-23% to SS. (Column D, lines 1, 7, 8-11)
These allocation percentages are applied to the projected expenses or costs of
the collection system O&M, treatment plant O&M and COP service in order to
determine the total allocation of funding requirements to flow, BOD and SS.
(Columns A-E, lines 12-16)
Capital Improvement Program Adjustments
The CIP for the planning period through 2020 is very much higher in the first few
years than in the later years. In order to avoid an immediate rate spike when the
CIP is the highest, the average annual CIP through 2020 is used to calculate the
rates. In addition to avoiding an immediate rate spike, this method will provide
for smooth rate increases over time. For example, the average CIP for the
planning period is about $150 million, while the budgeted CIP for 2004-05 is over
$231 million. (Columns B & D, line 1)
At the September FAHR Committee meeting, the Directors were advised that
total and average Validated CIP requirements that were included in the rate
alternatives that were being reviewed included all of the projects, including those
for additional capacity. The Board had previously adopted a policy to fund
additional capacity projects from Capital Facilities Capacity Charges (CFCCs)
and Supplemental CFCCs collected from new and expanding users. Because
these additional capacity projects will not be built unless there is an increase in
demand and because there is an alternative method of funding them, these
projects have been removed from the Permit User rate calculation. This change
removes $862 million of requirements over the planning period to 2020.
Not all of our CIP is initially funded through user fees or CFCCs. The Board has
decided to fund $1.4 billion of the CIP by borrowing. This is approximately 56%
of the Validated CIP through 2020. Borrowing defers the need for user fees.
Because we include the annual COP service in the user fee rate calculation, it is
appropriate to reduce the budgeted CIP outlay by 56% to avoid double counting
the CIP and the COP service. This recognition of the requirement to include only
the "cash-funded" CIP reduces the average annual VCIP requirement by $54
million.
A separate schedule of the adjustments to the Validated CIP discussed above is
included with this package. (Columns B & D, lines 3-4)
Calculation of Permit User Rates
Page 4of6
October 13, 2004
Impact of Revenues
At this point, the adjusted cash needs for the year have been determined; they
have been allocated to flow, BOD and SS. Rates could be calculated for each of
these wastewater parameters. However, it seems to be appropriate or fair to
reduce these total needs by projected revenues from other sources, notably
interest income and connection fees (Capital Facilities Capacity Charges or
CFCCs). While income from these sources does not reduce the cost of service,
it does reduce the total amount of revenue needed from all other sources.
Interest income is basically earned on the average District reserves, or cash
balances, during the year. Because the annual O&M needs are funded
completely each year by user fees collected that year and our reserves are
principally held to meet future capital needs, the annual interest income has been
allocated to Collection System CIP, Treatment Plant CIP and COP Service.
Once in these three categories, the interest income is allocated to flow, BOD and
SS in the ratio of the capital improvement program requirements. The interest
income budget for 2004-05 was $20.5 million. (Columns B, D & E, line 6)
Connection fees (CFCCs) are collected from new or expanding users to fund CIP
for additional capacity projects. Because the additional capacity projects were
removed from the Validated CIP in this rate calculation model, no adjustment
should be made for the budgeted connection fee revenues.
Quantities of Flow, BOD and SS
Each Master Plan or Strategic Plan contains a flow projection for the planning
period. The current Strategic Plan projection is for an average daily flow of 321
million gallons in 2020. Each year this projection is reviewed by staff and a flow
estimate for the next year is developed. The current estimate for 2004-05 is 250
million gallons per day or 91,250 million gallons per year (91 billion). (Column
"Description," line 18)
The average BOD and SS concentration is reported each year in the O&M
Annual Report for each plant along with the actual flow. The concentration for
each is converted to mass, in pounds, for each plant and then divided by the total
actual flow to develop a weighted average concentration for both BOD and SS
for the combined treatment plants. The most recent, 2002-03, annual average
concentration for BOD was 228 milligrams per liter and the concentration for SS
was 232.6 milligrams per liter. These concentrations are then combined with the
budgeted flow to determine the budgeted pounds of BOD and SS. (Column
"Description," lines 19 & 20)
Individual Rate Calculations
Dividing the total requirement for flow by the total budgeted flow produces a rate
for flow. The same process is followed for BOD and SS. These rates would
'
Calculation of Permit User Rates
Page 5of6
October 13, 2004
generate all the funds required for the average year if every user was billed
based upon actual flow, BOD and SS. (Columns A, 8, C, D & E, lines 18-20)
Change from Prior Calculation Model
Beginning in 1998-99, an additional step was added to reduce the parameter
rates even more. The intent of this adjustment was to make the Permit User
parameter rates equivalent to those implicit in the annual flat rate sanitary sewer
service user fee. These individual rates are the de facto rates paid by all of the
users who do not have Source Control permits. These rates for 2004-05 are
significantly lower than the "requirement-based rates" calculated to this point
because $185 million of the actual budgeted needs will be funded from
"reserves" and another $28 million will be received as property taxes.
For the past few years these reduced de facto rates were presented to the Board
for adoption as Permit User rates. The issue with using these rates comes from
the Ordinance that provides for Permit User rates. Ordinance No. OCSD-01
requires that the annual cost of service calculated from the actual Permit User
discharge and the adopted Permit User rates must be reduced by the property
tax paid by that user. Those taxes have already been considered during the
calculation of the reduced rates that are equivalent to the flat rate sanitary sewer
service user fee. Correcting this calculation was the original intent of staff in July.
The proposed model does not reduce the Permit User rates for property taxes as
that reduction is made for each individual Permit User based upon that Users
specific property tax allocation to the Sanitation District.
The resultant rates for 2004-05 are higher than the rates that were presented to
the Board and adopted in April as shown in the following table.
Percent
Description Adopted Proposed Change
Flow per mg $ 368.58 $ 577.30 57%
BOD per 1000 lb $ 248.55 $ 270.68 9%
SS per 1000 lb $ 238.45 $ 414.27 74%
Avg Permit User @ $18,784.67 $25,395.71 35%
13 mg, 40 k#, 16 k#
Alternatives
Providing the Directors agree with this proposed method of calculation and wish
to recommend that these rates be adopted, it will then be necessary to determine
an effective date. The options include:
• January 1, 2005, as that will be subsequent to the public hearing and the
action and will provide Permit Users some opportunity to adjust their
processes,
Calculation of Permit User Rates
Page 6of6
October 13, 2004
• July 1, 2005, which would finish 2004-05 with the rates that have been
previously adopted and use the proposed methodology beginning in fiscal
year 2005-06.
A January 1, 2005, effective date clearly meets the requirements of public notice,
public hearing and the referendum period. Having two rates for a year is
problematic for staff, but could be accommodated in the reconciliation process.
Invoices during the year are based upon estimated quantities and are reconciled
to actual at year end. The rate adjustment could be included in that process.
Holding this methodology in abeyance until the next rate adoption cycle is the
simplest administrative option. The Board will need to adopt rates for 2005-06 in
April or May 2005, and will have to conduct a Proposition 218 notification of all
users. This notification will include Permit Users, but they could also receive a
special notice. The rates that have been adopted are lower in each category
than the proposed rates, so no Permit User is being overcharged. The problem
of double credit for Permit User property taxes would remain for another year.
Permit User property taxes are estimated to total $908,000. One individual
Permit User accounts for $559,000 of that amount and no additional Permit User
fees are collected from that user. This means the approximate total Permit User
fees that would potentially be improperly offset by property taxes is $349,000.
GGS
H:\dept\fin\21O\CRANE\FAHR\FAHR2004\0CTOBER\Attachment_1_Staff Report Penn it Users 10-2004.doc
'
912912004
City
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
Estimated Impact on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Actual Discharge Quantities
Permit User Name
ALSTYLE APPAREL-ACTIVEVJEAR MFG. CO. INC.
MC P FOODS INC.
NOR-CAL BEVERAGE CO. INC. (MAIN)
NOR-CAL BEVERAGE CO. INC. (TETRA)
DISNEYLAND RESORT -DCA
EXPO DYEING AND FINISHING INC.
SUNDOR BRANDS INC. A PROCTER & GAMBLE CO
STEPAN COMPANY
STEINER CORP. OBA AMERICAN LINEN SUPPLY
PRECISION ANODIZING AND PLATING INC.
ANAHEIM MEMORIAL MEDICAL CENTER
DYNAMIC DETAILS INC.
SIOUX HONEY ASSOCIATION CO-OP
DON MIGUEL MEXICAN FOODS INC.
KC A ELECTRONICS INC.
WEST ANAHEIM MEDICAL CENTER
HARRYS DYE & WASH INC
TAC WEST, INC.
CITY OF ANAHEIM -WATER SERVICES
U.W.M.C. HOSPITAL CORPORATION
BRIDGFORD FOODS CORPORATION
WEYERHAEUSER COMPANY
IDEAL ANODIZING INC.
MUL Tl-FINELi NE ELECTRONIX INC.
S & S POLISHING/PLATING
ANAHEIM GENERAL HOSPITAL
DANONE WATERS OF N. A -ANAHEIM
DRS TECHNOLOGIES INC
ARTISTIC PLATING & METAL FINISHING INC.
DELPHI AUTOMOTIVE SYSTEMS
INTEC PRODUCTS INC.
HAWK INDUSTRIAL UNIFORM
MICROMETALS INC. #2
UNIVERSAL ALLOY CORP.
CEROMET INC.
AMERICAN CIRCUIT TECHNOLOGY INC.
PRIVATE LABEL LABORATORIES
Estimated
OCSD80%
Share of
Property
Tax
3,875
251
1,898
810
656
5,122
2,870
308
28
890
303
3,217
1,988
182
3,883
788
7,751
264
847
11
1,997
656
1,093
280
2,234
219
114
792
855
311
322
413
Celculated
Permit User
Fee
2004-05
Adopted
835,874
403,508
249,159
151,038
131,125
87,239
107,719
55,217
50,947
51,018
48,207
31,035
38,094
33,221
19,393
23,231
17,502
18,710
19,350
14,719
14,885
13,728
13,385
9,888
9,888
10,993
6,983
7,022
8.815
5,938
8,543
8,583
4,448
4,113
4,968
3,590
4,848
Cslculated
Permit User
Fee
2004-05
Proposed
833,278
449,574
297,107
173,844
190,003
118,884
127,408
81,518
85,380
88,175
88,958
48,383
39,885
44,201
29,580
33,883
25,027
24,247
33,219
21,328
20,758
19,075
22,580
14,575
18, 175
15,930
10,843
10,845
9,985
8,il74
14,511
9,404
8,373
5,929
8,078
5,423
5,498
Proposed
CostfD
Conact
Calculation
Method
197,602
48,088
47,948
22,807
58,879
31,845
19,888
8,302
14,413
35,159
20,749
15,329
3,771
10,880
10,187
10,431
7,525
5,537
13,889
8,809
5,893
5,348
9,195
4,709
6,288
4,938
3,859
3,823
3,350
3,038
5,988
2,841
1,927
1,818
1, 111
1,834
651
Percentage
Increase
31.1%
11.4%
19.2%
15.1%
44.9%
38.3%
18.3%
11.4%
28.3%
88.9%
44.9%
49.4%
10.4%
33.1%
52.4%
44.9%
43.0%
29.8%
71.7%
44.9%
39.8%
38.9%
88.7%
47.7%
83.8%
44.9%
55.3%
51.8%
SQ.8%
51.2%
89.9%
43.3%.
43.3%
44.1%
22.4%
51.1%
13.4%
Total
Flow
(MG)
380.8538
18.4887
38.9144
23.3847
94.7449
105.4495
27.1223
7.3083
21.5522
34.7895
33.3875
48.5497
2.1595
14.4228
39.2034
18.7858
21.0879
11.8491
8.0758
10.6352
9.1297
9.1183
8.8475
15.1814
13.7040
7.9434
17.9175
13.0501
11.4455
9.9885
3.9450
5.9494
5.2781
5.8353
2.0917
8.8485
0.2325
Page 1of13
Total
BOD
(lbs)
1,541,380
1,554,057
827,333
540,448
197,543
181,547
380,115
210,897
135,249
1.835
89,813
28,888
140,914
78,233
10,308
34,998
25,138
48,892
95
22,174
27,877
28,073
718
9,980
873
18,582
895
4,543
5,004
4,398
509
10,089
6,325
5,350
15,012
2,445
18,055
Total
SS
(lbs)
501,739
48,840
122,382
33,930
197,543
34,471
34,457
847
39,388
158,489
69,813
28,316
1,149
35,480
9,990
34,998
14,800
11,789
71,858
22,174
19.171
18,304
41,707
7,528
19,377
18,582
554
4,543
4,835
4,871
29,197
7,830
3.899
2,984
1,948
2,232
1,151
H:\dapt\fln\210\STREED\Excal\Permlt Usera\2002-o3 racon and rates Oct 2004.xls
912912004
City
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
Estimated lmpad on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Actual Discharge Quanttties
Permit User Name
COPPER CLAD MULTILAYER PRODUCTS INC.
LINCO INDUSTRIES INC.
MAGNETIC METALS CORP
Y K K (U.S.A) INC.
J & H DEBURRING INC. #2
BLACK OXIDE INDUSTRIES INC.
AP W ENCLOSURE SYSTEMS, LLC
CLASSIC PLATING INC.
ANAHEIM PLATING & POLISHING INC.
BOEING COMPANY -BLDG. 271
GENERAL CERAMICS LLC
SMT DYNAMICS
CALIFORNIA CUSTOM SHAPES, INC.
CREST COATING INC.
MILBANK WEST INC.
ESSEX ELECTRIC INC
GUNTHER ATHLETIC SERVICE
MURRIETTA CIRCUITS INC.
ECONOLITE CONTROL PRODUCTS INC.
CYTECH ENGINEERIED MATERIALS
STAINLESS MICRO-POLISH INC.
ADVANCE TECH PLATING INC. #2
NEVILLE CHEMICAL COMPANY
UOPLLC
KINSBURSKY BROTHERS SUPPLY INC.
SUPERIOR PLATING
TAORMINA INDUSTRIES INC. #4
PRECISION PAINTING
AMERIMAX BUILDING PRODUCTS INC.
ALLIED PACIFIC METAL STAMPING
LEACH INTERNATIONAL
NU-TEC POWDER COATING
I PC CAL FLEX INC.
JELLCO CONTAINER INC.
ANAHEIM TRUCK DEPOT #2 BIN WASH
SECHRIST INDUSTRIES, INC.
ELECTRORACK PRODUCTS CO. INC.
Estimated
OCSD80%
Share of
Property
Tax
64
844
2,284
25
55
488
86
1,806
188
272
250
915
22
88
353
93
128
0
71
524
284
288
478
158
198
123
578
524
471
Cslculated
Permit User
Fee
2004-05
Adopted
3,237
3,861
4,048
2,903
3,821
2,296
2,839
2,024
2,087
2,574
2,268
2,333
2,192
2,150
1,988
1,958
1,898
1,654
1,707
1,590
1,155
1,175
1,058
999
1,113
885
1,179
1,478
990
1,132
790
993
848
949
853
822
744
Cslculated
Permit User
Fee
2004-05
Proposed
5,045
8,581
5,594
4,338
5,778
3,803
3,781
3,102
3,101
3,740
3,880
3,390
2,792
2,753
2,811
2,735
2,509
2,481
2,482
2,308
1,711
1,835
1,598
1,518
1,849
1,381
1,842
2,422
1,588
1,409
1,224
1,395
1,141
1,418
1,238
1,214
1,083
Proposed
Cost ta
Conect
Calculation
Method
1,808
2,820
1,547
1,435
1,955
1,308
1,122
1,078
1,034
1,185
1,422
1,057
800
803
842
777
813
807
755
718
558
880
542
517
538
478
484
844
598
278
434
401
293
489
383
392
320
Percentage
Increase
55.8%
88.1%
38.2%
49.4%
51.2%
57.0%
42.5%
53.2%
50.0%
45.3%
82.7%
45.3%
27.4%
28.0%
42.8%
39.7%
47.9%
48.8%
44.2%
45.0%
48.1%
58.2%
51.3%
51.7%
48.1%
53.8%
39.3%
83.8%
80.4%
24.5%
54.9%
40.4%
34.5%
49.4%
44.9%
47.7%
43.0%
Total
Flaw
(MG)
5.0918
3.2995
1.8881
5.8158
1.3247
4.5814
2.7002
3.9877
3.8712
2.1347
2.7983
1.8384
1.5832
1.3333
1.8581
1.7835
2.5582
2.1761
1.4443
1.1798
2.3054
1.7249
1.8888
1.8723
1.4811
1.9708
0.9878
0.3788
1.4787
0.5544
1.6300
0.8009
0.8800
0.8923
0.8183
0.5401
0.5819
Page2of 13
Total
BOD
(lbs)
1,803
577
8,253
2,184
4,837
597
4,080
1,014
1,805
3,712
458
3,402
5,892
5,574
3,053
3,452
1,718
1,708
2,559
2,372
933
604
700
835
1, 197
325
2,138
760
244
3,239
285
1,820
1,729
1,160
1,285
1, 117
1,201
Total
SS
(lbs)
4,034
10,910
5,781
1,218
8,938
1,924
2,883
1,288
1,320
3,627
4,712
3,402
815
1,145
2,200
1,889
1,373
1,798
2,259
2,373
309
1,831
857
835
1,182
325
1,219
4,828
1,818
513
498
1,340
428
1,701
1,285
1,447
999
H:\dept\fln\210\STREED\Excel\Permlt Usera\2002-03 recon and rates Oct 2004.xla
912912004
City
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
Estimated lmpad on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Actual Discharge Quantities
Permit User Name
RT I ELECTRONICS, INC.
TAYLOR-DUNN MANUFACTURING COMPANY
MILLENNIUM CIRCUITS SERVICES CORP
PICOFARAD INC.
RTR INDUSTRIES
RIGIFLEX TECHNOLOGY INC.
LINVATEC CORPORATION
PACIFIC UTILITY PRODUCTS INC.
IKON P011\1DER COATING
BRIDGEMARK CORP-DOWLING #2
AQUARIAN COATINGS CORP
ARO SERVICE
PRECON, INC.
A & R P011\1DER COATING INC.
ANAHEIM EXTRUSION CO. INC.
UNITED CUSTOM POLISHING & PLATING
ADVANCE TECH PLATING INC.
POWDERCOAT SERVICES INC. #1
PACIFIC IMAGE TECHNOLOGY, INC.
S MT DYNAMICS LLC
ELECTRO METAL FINISHING CORPORATION
EXQUISITE DESIGNS INC.
POWDERCOAT SERVICES INC. #4
POWDERCOAT SERVICES INC. #2
ACROBURR INC. #2
POWDERCOAT SERVICES INC. #3
MTS MICROELECTRONICS INC.
OLIVE OIL CO.
DETAILS INC #3, OBA DYNAMIC DETAILS INC.
TECHPLATE ENGINEERING CO. INC.
TRANSLINE TECHNOLOGY INC.
REMEDY ENVIRONMENTAL SERVICES
CUSTOM POWDER COATINGS
VEECO ELECTRO FAB INC. #2
ALL METAL PAINT STRIPPING INC. #2
AP W ENCLOSURE SYSTEMS LLC SOUTH
H. KOCH & SONS COMPANY
Estimated
OCSDSO%
Share of
Property
Tax
e
1,484
82
48
87
38
189
21
243
34
589
49
25
91
25
55
85
100
213
89
598
4,473
492
Calculated
Permit User
Fee
2004-05
Adopted
892
1,842
551
554
550
419
454
360
398
264
389
345
334
253
851
243
218
238
197
180
188
121
138
182
121
128
129
88
120
80
221
31
26
88
89
1,836
223
Calculated
Permit User
Fee
2004-05
Proposed
1.005
2,377
718
825
797
608
858
550
548
413
584
504
470
381
948
384
340
351
301
289
271
188
203
235
183
184
187
127
174
118
335
45
38
134
128
2,481
333
Proposed
Cost to
Canad
Ca!culatlon
Method
313
735
185
271
247
187
204
190
152
149
175
159
137
127
297
122
121
113
104
88
83
87
87
73
81
58
58
41
54
38
114
14
12
45
Percentage
lncmase
45.2%
44.8%
29.9%
49.0%
44.9%
44.5%
44.9%
52.8%
38.5%
58.8%
44.9%
48.1%
41.0%
50.3%
45.7%
50.0%
55.6%
47.7%
52.7%
49.0%
43.9%
54.9%
49.4%
44.9%
50.6%
48.2%
44.9%
47.2%
44.9%
47.0%
51.5%
44.9%
44.9%
50.3%
0.0%
0.0%
0.0%
Total
Flaw
(MG)
0.5217
1.2090
0.5159
0.5854
0.3975
0.6432
0.3281
0.5937
0.3639
0.7155
0.2813
0.2982
0.2709
0.4815
0.4888
0.4088
0.4279
0.3058
0.4080
0.2582
0.1443
0.2938
0.2006
0.1170
0.1726
0.1214
0.0937
0.1207
0.0887
0.0613
0.3958
0.0225
0.0189
0.1848
0.0437
2.5900
0.3282
Page3of 13
Total
BOD
(Iba)
1,024
2,480
1,299
629
829
508
884
235
722
587
474
573
187
943
197
78
284
97
178
292
27
127
244
108
188
194
95
181
108
150
47
39
41
154
1.227
212
Total
SS
(lbs)
1,029
2,432
161
792
829
234
884
347
344
587
493
384
154
993
181
173
249
94
178
263
27
127
244
131
168
193
78
181
128
158
47
39
41
144
1,578
212
H:\depl\fin\210\STREED\Excel\Permit Usera\2002-03 rea>n and rates Oct 2004.xls
9/29f.2004
City
ANAHEIM
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
Estimated Impact on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Actual Discharge Quantities
Pennlt User Name
DISNEYLAND RESORT
HEAL TH CARE APPAREL SERVICES
GERARD TILE
COOPER AND BRAIN INC.
WINONICS (BREA)
HARTE-HANKS SHOPPERS
KIRKHILL RUBBER CO (SOUTH)
ELECTRONIC PRECISION SPECIALTIES INC.
BREA COMMUNITY HOSPITAL
CRCRIMINC
BRISTOL INDUSTRIES
FINELINE CIRCUITS & TECHNOLOGY INC.
SCISOREK & SON FLAVORS, INC.
HARBOR TRUCK BODIES INC.
MORAVEK BIOCHEMICALS INC.
CENTRAL POWDER COATING
ENGRAVERS INK CO
KIRKHILL RUBBER CO (SOUTH)
AERA ENERGY LLC #2
DEAN FOODS CO. OF CALIF. INC(MILK PLANT)
SABA TEXTILES INC.
SEVEN-UP BOTTLING COMPANY
AMERIPEC INC.
DEAN FOODS CO. OF CALIF. INC.(ICE CREAM)
PEPSI-COLA BOTTLING GROUP
KU A TEXTILES INC.
SUNCLIPSE, INC. DBA CORRU KRAFT II
CLEUGH'S RHUBARB COMPANY
ULTRA WHEEL COMPANY
PRIMATEX INDUSTRIES OF CA INC
GEORGIA PACIFIC CORPORATION
CROCKETT CONTAINER CORP.
MEAD PACKAGING
TRIM-LOK IR. T.P.
HANSON-LORAN CO .• INC.
ALLOY DIE CASTING CO.
WEYERHAEUSER COMPANY #2
Estlmated
OCSDSO%
Shara of
Property
Tax
559,204
442
890
4
803
1,330
828
121
3,175
1,590
884
118
375
378
3
85
1,028
248
1,418
1,009
788
584
815
3,837
850
2,347
218
1.212
335
3,808
878
1,908
959
278
458
Cs!cu!ated
Permit User
Fee
2004-0S
A/JJ:Jpted
488,857
14,480
15,291
8,839
8,152
8,902
7,785
3,784
4,850
3,587
2,830
1,121
1,184
841
371
274
115
114
188,434
124,485
120,741
96,278
87,828
80,274
35,259
37,727
29,344
11,080
9,817
7,119
4.444
3,240
2,095
2,112
1,848
735
Calculated
Permit User
Fee
2004-05
Proposed
705,835
20,405
25,817
12,814
12,308
11,788
11,484
5,960
7,027
5,384
4,255
1,458
1,502
927
581
388
184
185
218,480
173,718
142.284
112,239
87,880
72,985
51,327
53,385
38,458
18,425
15,235
8,781
5,169
4.400
3,174
2,849
2,395
1,085
Proposed
Coat to
Correct
Calculation
Method
148,431
5,925
10,525
3,978
4,155
2,885
3,889
2,177
2,178
1,788
1,425
335
318
288
190
94
69
47,055
49,253
21,523
15,981
20,053
12,892
18,088
15,858
7,112
5.388
5,418
1,682
724
1,180
1,079
537
748
330
Percentage
Increase
28.2%
40.8%
88.8%
45.0%
51.0%
32.2%
47.3%
57.5%
44.9%
49.7%
50.4%
29.9%
28.9%
44.7%
51.2%
34.2%
59.9%
0.0%
0.0%
27.8%
39.8%
17.8%
18.8%
29.7%
21.1%
45.8%
41.5%
24.2%
48.5%
55.2%
23.3%
18.3%
35.8%
51.5%
25.4%
46.4%
44.9%
Total
Flaw
(MG)
354.5820
15.5040
4.7318
15.4992
18.1971
4.8353
8.0498
8.4544
3.5041
5.2437
4.3758
1.0778
0.8409
0.4984
0.8824
0.2852
0.1137
0.0821
38.2970
129.0030
34.6324
22.1770
10.1385
18.5449
28.8471
10.7188
10.3142
15.8033
12.8380
2.5314
0.8870
1.9054
3.8847
1.1808
1.7335
0.5313
Page4of 13
Total
BOD
(lbs)
731,345
23,419
2,801
8,708
5,180
21,063
9,830
499
7,308
3,313
2,384
2,628
3,114
961
281
570
54
171
488,307
213,403
405,378
332,831
181,045
189,788
50,339
71,270
88,100
11,085
8,273
21,288
15,481
8,879
1,376
6,872
2,222
1,108
Total
SS
(lbs)
731,346
12,349
53,895
2,990
3,750
7,905
10,212
2,280
7,308
3,525
2,808
296
418
918
281
147
250
171
163,225
100,129
30,278
22,580
78,231
28,282
50,808
87,382
17,371
10,244
14,788
3,772
1,108
3,471
1.376
811
1,915
1,108
H:\dept\fln\210\STREED\Excel\Permlt Uaera\2002-Q3 racon and rates Oct 2004.xla
9/29/2004
City
BUENA PARK
BUENA PARK
BUENA PARK
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
CYPRESS
CYPRESS
CYPRESS
FOUNTAIN VALLEY
FOUNTAIN VALLEY
FOUNTAIN VALLEY
FOUNTAIN VALLEY
FOUNTAIN VALLEY
FOUNTAIN VALLEY
FOUNTAIN VALLEY
FOUNTAIN VALLEY
FOUNTAIN VALLEY
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
Estimated Impact on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Actual Discharge Quantities
Permit User Name
GENERAL CONTAINER CORPORATION
GARDNER LITHOGRAPH, INC.
DERM COSMETICS LAB'S INC.
WEST NEWPORT OIL COMPANY
FAIRVIEW STATE HOSPITAL
LOS ANGELES TIMES COMMUNICATIONS LLC
IC N PHARMACEUTICALS INC.
VELIE CIRCUITS INC.
SANMINA CORPORATION (AIRWAY)
MESA CONSOLIDATED WATER DISTRICT
SANMINA CORPORATION (REDHILL)
EATON CORPORATION
TOYOTA RACING DEVELOPMENT
PRIME TECHNOLOGIES, INC.
SEMICOA SEMICONDUCTORS
CRITERION MACHINE V«>RKS
RAILMAKERS, INC.
IRVINE SENSORS CORP.
AVIATION EQUIPMENT STRUCTURES, INC.
BOIENG COMPANY (CYPRESS)
TAYCO ENGINEERING, INC.
HYATT DIE CASTING & ENGINEERING CORP.
PRO-TECH
PAYTON TECHNOLOGY CORP
KODAK PROCESSING LABS
OMNI METAL FINISHING, INC.
CUSTOM ENAMELERS INC.
SANMINA CORPORATION
UNITED CIRCUIT TECHNOLOGY INC.
KENLEN SPECIALITIES INC.
A & G ELECTROPOLISH
KIMBERL Y·CLARK VVORLDVVIDE, INC.
FULLERTON CULTURED SPECIAL TIES
DAE SHIN USA. INC.
VAN LAW FOOD PRODUCTS, INC.
Y2K TEXTILE CO., INC.
CALIF STATE UNIV 0 FULLERTON
Estimated
OCSD80%
Share of
Property
Tax
349
327
189
0
8,298
2,585
88
1,571
1,081
192
242
245
137
140
51
899
535
888
830
143
130
143
118
57
128
187
19,807
959
1,180
554
1,998
Calculated
Permit User
Fee
2~
Adopted
529
484
339
83,944
89,893
20,878
9,482
4,828
3,785
3,484
2,535
3,093
2,908
2,200
1,312
387
135
248
380
1,798
983
744
8,257
7,809
7,114
4,830
812
782
582
329
278
317,218
188,388
128,484
155,874
110,382
71, 197
Calculated
Permit User
Fee
2004-05
Proposed
781
704
413
80,173
94,028
25,517
14,430
8,849
5,829
5,440
3,884
4,803
4,210
2,883
1.982
542
198
382
551
2,808
1.388
1,078
12,094
11.506
9.981
7,282
1.210
1.077
848
491
432
490,183
207,019
179,191
199,584
148,734
104,305
Proposed
Cost to
Conecl
Calculaflon
Method
232
221
75
18,229
24,138
4,841
4,948
2,221
2,045
1,978
1,328
1,710
1,304
883
850
175
81
18
808
404
334
3,837
3,897
2,887
2,853
398
295
288
182
154
172,947
38,850
52,707
43,711
38,373
33,108
Percentage
Increase
43.9%
45.8%
22.0%
25.4%
34.5%
23.4%
52.2%
48.0%
54.0%
57.0%
52.4%
55.3%
44.9%
30.1%
49.8%
47.7%
44.9%
0.0%
3.0%
44.9%
41.1%
44.9%
46.5%
51.2%
40.3%
57.3%
49.0%
37.7%
45.7%
49.3%
55.2%
54.5%
23.0%
41.7%
28.0%
34.8%
46.5%
Total
Flow
(MG)
0.4284
0.4078
0.1070
43.9588
32.8890
10.5488
18.5838
8.5218
7.8882
4.8293
5.4701
2.4984
2.2852
2.0057
1.9849
0.3285
0.0975
0.2918
0.2834
1.2994
0.6582
0.5373
15.2290
13.8517
9.9591
10.0812
1.1772
1.1613
0.8111
0.5838
0.5794
451.8799
31.4280
132.8300
4.8980
119.7883
98.2000
Page5of 13
Total
BOD
(lbs)
813
685
1,047
174,888
157, 171
80,439
5,421
4,055
1,823
1,778
1,218
2,565
4,319
5,188
1, 191
465
203
314
585
2,709
1,732
1,120
8,011
5,292
10,882
784
784
1,301
898
278
94
201,519
618,277
199,711
440,157
219,995
81,899
Total
SS
(lbs)
709
885
185
18,133
78,448
7,405
5,421
2,008
2,300
5,521
908
6,437
4,185
738
1,191
551
203
283
588
2,709
1,298
1,120
2,738
5,292
3,118
3,048
788
148
463
219
174
422,093
117,289
118,954
187,838
48,358
81,424
H:\depl\fin\210\STREED\Excel\Permlt Usera\2002-03 recon and mies Ocl 2004.xls
9129/2004
City
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
Estimated lmpad on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Actual Discharge Quantities
Permit User Name
FAIRCHILD FASTENERS
\MlRLD CITRUS WEST
ST. JUDE MEDICAL CENTER
ORANGE COUNTY METAL PROCESSING
BECKMAN COULTER, INC.
PC A METAL FINISHING, INC.
WINONICS, INC.
WESTERN YARN DYING
NELCO PRODUCTS, INC.
JOHNSON CONTROLS BATTERY INC.
CARGILL INC.
SUNCLIPSE, INC. (CORRUGATOR PLANT)
WEIDMANN WATER CONDITIONERS, INC.
MONOGRAM SYSTEMS
B I TECHNOLOGIES, INC.
KRYLER CORPORATION
SUNCLIPSE INC.
SCIENTIFIC SPRAY FINISHES, INC.
CARAN PRECISION ENGINEERING
SANTANA SERVICES
DR SMOOTHIE ENTERPRISES
FULLERTON PLATING
HOUSE FOODS AMERICA CORPORATION
U.S. DYEING & FINISHING INC.
PILKINGTON AEROSPACE
LINFINITY MICROELECTRONICS INC.
IDEAL UNIFORM RENTAL SERVICE
GOODVVIN COMPANY
CATALINA CYLINDERS A DIV. OF APP
AIR INDUSTRIES CORP.-KNOTT
COASTLINE METAL FINISHING CORP.
ELECTRON PLATING 111 INC.
BAZZ HOUSTON CO.
CANNON EQUIPMENT WEST INC.
LACEY CUSTOM LINENS
AIR INDUSTRIES CORP. (CHAPMAN)
D & S CUSTOM PLATING INC.
Estimated
OCSD80%
Shara of
Property
Tax
833
1,811
60
8,432
99
59
248
283
2,174
1,107
1,032
20
1,979
1,554
1,032
25
558
15
398
880
2,381
3,241
142
838
1,858
230
131
343
437
40
508
42
carculated
Permit User
Fee
2004-05
Adopted
22,109
28,395
17,880
13,424
13,351
8,109
8,725
5,778
5,817
5,054
5,428
8,874
3,941
4,025
2,079
1,300
1,853
1.228
955
389
58
142
389,484
209,580
18,543
11,721
12,402
7,978
5,092
5,441
3,070
2,247
2,218
1.406
1,508
804
542
Calculated
Permit User
Fee
2004-0S
Proposed
32,915
32,184
25,819
22,024
19,714
12,485
10,510
7,810
8,373
7,901
7,785
9,811
8,313
8,312
3,058
2,018
2,593
1,789
1,384
842
83
215
472,744
289,849
30,086
18,485
18,740
9,328
7,505
7,884
4,741
3,504
3,185
2,048
2,351
1,139
819
Proposed
Cost to
Corrad
Cslculatlon
Method
10,805
5,789
7,939
8,800
8,384
4,355
3,785
2,032
2,758
2,848
2,359
2,737
2,372
2,288
977
718
740
571
429
253
28
103,280
80,089
11,523
8,744
8,337
1,352
2,413
2,443
1,871
1,258
989
842
843
335
277
Percentage
Increase
48.9%
21.9%
44.9%
84.1%
47.7%
53.7%
58.3%
35.2%
49.1%
58.3%
43.5%
39.8%
80.2%
58.8%
47.0%
55.1%
39.9%
48.5%
44.9%
85.0%
44.9%
0.0%
27.9%
38.2%
82.1%
57.5%
51.1%
17.0%
47.4%
44.9%
54.4%
58.0%
43.7%
45.8%
55.9%
41.7%
51.2%
Total
Flow
(MG)
28.2354
8.3974
12.7750
19.8508
14.4015
18.3000
18.2835
8.7538
8.0274
9.0172
8.2534
1.8184
7.9213
3.4190
2.2038
3.1952
1.1293
1.8540
0.8903
0.4538
0.0418
0.2750
78.7310
208.0300
19.1830
27.3190
7.7478
1.7558
8.7488
3.9312
5.9377
5.1320
3.0858
1.2770
1.1490
0.5379
0.8982
Page8of 13
Total
BOD
(lbs)
23,849
82,474
28,838
388
15,983
3,700
919
11,189
5,459
1,935
7,742
13,838
213
2,881
2,590
250
3,443
1,428
1,439
34
87
85
1,019,871
380,501
5,843
1,095
14,390
27,415
5,889
8,197
1,357
489
2,928
1,953
1,218
1,388
407
Total
SS
(lbs)
27,310
14,838
28,838
25,541
17,088
4,958
2,108
2,130
5,459
5,241
5,020
11,908
4,080
8,591
2,814
250
2,438
1,105
1,439
895
87
81
387,848
180,887
42,052
5,787
25,038
2,157
4,995
8,197
2,283
1,001
1,504
1,887
3,279
1,095
459
H:\dept\fln\210\STREED\Exr:el\Permft Users\2002-03 recon and rates Ocl 2004.xls
9/2912004 Estimated Impact on Permit Users by Flow, BOD and SS Page 7of13
Based Upon 2002-03 Actual Discharge Quantities
Esttmated Calculated calculated Proposed
OCSD80% Permit User Permit User CoslfD Total Total Total
City Permit User Name Share of Fee Fee Correcl Percentage Flaw BOD SS Property 2004-05 2004-05 Calculation Increase
Tax Adopted Proposed Method (MG) (lbs) (lbs)
GARDEN GROVE CDVIDEOINC 480 887 228 49.2% 0.8873 440 440
GARDEN GROVE BASIC ELECTRONICS, INC. 201 381 479 118 32.7% 0.2178 833 3Q8
GARDEN GROVE STAR POWDER COATING 9 45 59 14 31.4% 0.0308 108 30
GARDEN GROVE MIRACLE STRIPPING & PLATING, INC 30 44 14 44.9% 0.0220 48 48
GARDEN GROVE GRAPHIC PACKAGING CORP. 2,043 1,325 1,921 0.0% 0.9599 1,995 1,995
HUNTINGTON BEACH BOEING COMPANY (GENERAL FAC) 5,970 89,944 137,487 47,544 52.9% 55.9220 94,840 192,113
HUNTINGTON BEACH JOHN A. THOMAS 23,422 28,514 5,092 21.7% 11.8342 71,025 8,210
HUNTINGTON BEACH COLUMBIA HUNTINGTON BEACH HOSPITAL 908 14,831 21,200 8,570 44.9% 10.5715 22,042 22,042
HUNTINGTON BEACH NUEVO ENERGY CO (HB) 193 12,741 19,029 8,288 49.4% 11.4379 14,800 20,324
HUNTINGTON BEACH CAL-AURUM INDUSTRIES INC. 228 5,183 8,082 2,899 55.9% 13.0295 828 944
HUNTINGTON BEACH BRINDLE/THOMAS OIL COMPANY 59 5,787 8,785 998 17.3% 2.1900 19,342 839
HUNTINGTON BEACH CAMBRO MANUFACTURING 934 4,948 7,189 2,222 44.9% 3.5750 7,454 7,454
HUNTINGTON BEACH PRECISION RESOURCE, CALIF DIV 828 3,832 5,489 1,837 42.7% 3.8088 5,881 4,051
HUNTINGTON BEACH SPEEDY CIRCUITS, FACILITY #2 120 3,073 4,375 1,302 42.4% 4.7120 4,137 1,293
HUNTINGTON BEACH GARG-OIL PRODUCTION LLC 139 1,289 2.019 730 58.8% 3.4973
HUNTINGTON BEACH TIODIZE COMPANY, INC. 98 1,417 2,189 772 54.4% 3.0931 488 855
HUNTINGTON BEACH CITY OF HUNTINGTON BEACH FIRE DEPARTMENT 1,355 2,028 870 49.5% 2.5012 1,084 709
HUNTINGTON BEACH BOEING COMPANY (GRAHAM) 1,550 2,248 896 44.9% 1.1200 2,335 2,335
HUNTINGTON BEACH CAPRO OIL COMPANY 22 708 1.108 400 58.8% 1.9152
HUNTINGTON BEACH SOUTH COAST OIL CORPORATION 182 859 1.033 373 58.8% 1.7892
HUNTINGTON BEACH HB OIL OPERATIONS TRUST 22 847 1.222 375 44.3% 1.0490 1,137 744
HUNTINGTON BEACH SOLDERMASK. INC. 132 825 883 257 41.1% 0.3184 1,140 942
HUNTINGTON BEACH CEMPI INDUSTRIES INC. 175 489 891 222 47.3% 0.5315 580 580
HUNTINGTON BEACH LOGI GRAPHICS, INC. 144 378 582 185 48.8% 0.7109 308 167
HUNTINGTON BEACH MILLETT INDUSTRIES 418 807 190 45.4% 0.3409 802 598
HUNTINGTON BEACH M.S. BELLOWS 52 393 493 100 25.5% 0.1455 1,118 257
HUNTINGTON BEACH ROCK INDUSTRIES, INC. 97 301 442 142 47.1% 0.3820 347 308
HUNTINGTON BEACH SPEEDY CIRCUITS, DIV OF PJC 321 485 144 44.9% 0.2320 484 484
HUNTINGTON BEACH PIER OIL COMPANY 35 205 320 118 58.8% 0.5550
HUNTINGTON BEACH PETROPRIZE 7 108 188 80 58.8% 0.2877
HUNTINGTON BEACH BRINDLE/THOMAS 54 84 30 58.8% 0.1480
HUNTINGTON BEACH SIGNAL ASSOCIATES 3 25 39 14 58.8%. 0.0883
HUNTINGTON BEACH SOUTH COAST OIL COMPANY 0.0%
HUNTINGTON BEACH ALEXANDER OIL COMPANY 3 0.0%
HUNTINGTON BEACH W. M. ELLIOTT 7 0.0%
HUNTINGTON BEACH \NILVIAN JEWELL RENNER 17 2 0.0% 0.0029
HUNTINGTON BEACH \NILLIAM J. SCOTT 28 0.0%
H:\dept\ftn\210\STREED\Excel\Permlt Usera\2002-o3 recon and rates Oct 2004.xls
9/2912004 Estimated Impact on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Actual Discharge Quantities
City Pennit User Name
HUNTINGTON BEACH O'DONNELL OIL COMPANY
HUNTINGTON BEACH S & COIL CORPORATION
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
LA HABRA
LA HABRA
LA HABRA
LA HABRA
LA HABRA
LA PALMA
LA PALMA
LOS ALAMITOS
LOS ALAMITOS
LOS ALAMITOS
LOS ALAMITOS
ROYAL TY CARPET MILLS INC.
B. BRAUN MEDICAL INC.
MARUCHAN, INC.
TODDS ENTERPRISES
PACKARD-HUGHES INTERCONNECT SYSTEMS
EDWARD LIFESCIENCES LLC
UNION INCORPORATED
PRUDENTIAL OVERALL SUPPLY
JEFFERSON SMURFIT CORPORATION (U.S.)
RAYNE DEALERSHIP CORP
ENTHONE INC.
ELECTROLURGY INC.
SUNSET ENVIRONMENTAL, INC. #2
COSMOTRONIC CORP
RICOH ELECTRONICS INC.
PRINTRONIX, INC.
NEV\PORT CORPORATION
0 C B REPROGRAPHICS
FMH INVESTOR GROUP
NEVWORT PRECISION OPTICS
SUNSET ENVIRONMENTAL, INC. #1
ALL TEK CIRCUIT INC.
DYE TECHNIQUE INC.
WINTEC, LLC
RALPHS GROCERY COMPANY (BAKERY)
SHEPARD BROTHERS INC.
WATERMAN
ARNOLD ELECTRONICS, INC. #1
LA HABRA PLATING CO. INC.
LA PALMA INTERCOMMUNllY HOSPITAL
PERFORMANCE MACHINE INC
JOINT FORCES TRAINING BASE.LOS ALAMITOS
LOS ALAMITOS GENERAL HOSPITAL
TREND OFFSET PRINTING SERVICES INC.
ARROVVHEAD PRODUCTS CORPORATION
Estimated
OCSD60%
Shara of
Property
Tax
65
106
155
15,072
890
424
994
2,810
215
2,349
211
87
184
28
118
1,184
1,303
106
370
248
28
2,715
318
9
22
15
1,095
3,871
2,882
Calculated
Permit User
Fee
2004-05
Adopted
13
278,068
110,353
44,819
45,589
19,591
22,194
22,008
9,348
8,844
5,519
8,923
4,970
5,811
3,288
2,900
2,319
2,347
2.182
1,279
827
810
427
187
117
28,339
5,803
2,163
1,805
815
17,035
1,808
25,223
17,049
11,934
8,418
Calculated
PennitUser
Fee
2004-05
Proposed
18
347,410
188,594
54,380
59,249
29,891
32,751
28,544
13, 188
11,750
8,709
8,175
7,884
8,545
4,404
4,303
3,389
3,401
3,133
1,874
1,208
1,173
839
270
170
35,827
8,519
3,373
2,800
1,272
24,884
2,330
37,248
24,705
17,293
12,420
Proposed
Cost to
Correct
Calculation
Method
71,341
58,241
9,741
13,880
10,100
10,557
8,538
3,840
3,108
3,190
1,252
2,894
2,934
1,118
1,404
1,050
1,054
971
595
381
364
212
84
53
8,488
718
1,210
998
457
7,849
722
12,025
7,858
5,359
4,004
Percentage
Increase
0.0%
0.0%
25.8%
52.8%
21.8%
30.0%
51.6%
47.8%
29.7%
41.1%
35.9%
57.8%
18.1%
58.2%
52.3%
34.0%
48.4%
45.3%
44.9%
44.9%
48.5%
48.0%
44.9%
49.8%
44.9%
45.2%
22.1%
12.3%
55.9%
55.2%
58.0%
44.9%
44.9%
47.7%
44.9%
44.9%
47.8%
Total
Flow
(MG)
0.0091
173.3180
237.2520
14.8254
7.7908
39.2188
26.0708
15.6178
8.0088
4.9828
12.3784
2.0340
9.4495
1.8145
3.1835
3.9095
1.8325
1.8987
1.5825
1.4484
0.8827
0.5850
0.9059
0.1348
0.0991
6.8379
0.3155
5.8179
4.1023
2.1230
12.3087
1.1821
25.8853
12.3191
8.8231
10.2132
Pages of 13
Total
BOD
(lbs)
19
752,704
50,689
137,997
120,788
11,619
25,842
54,008
16,583
18,334
611
23,113
1,084
6,758
6,851
3,028
3,375
3,538
3,258
1,593
1,162
1,220
284
281
168
91,387
21,984
190
474
88
25,884
2,423
30,685
25,685
17,979
9,889
Total
SS
(lbs)
19
105,273
43,228
20,873
53,243
9,427
25,842
11,849
12,821
9,489
3,378
1,797
5,106
13,883
1,718
2,981
3,375
3,538
3,258
1,487
1,233
1,220
94
281
162
17,521
932
190
733
88
25,884
2,423
33,805
25,885
17,979
9,430
H:\depl\ftn\210\STREED\Excel\Pennlt Usera\2002-03 18COn and rates Oct 2004.xls
912912004
City
LOS ALAMITOS
NE\NPORT BEACH
NE\NPORT BEACH
NE\NPORT BEACH
NE\NPORT BEACH
NE\NPORT BEACH
NE\NPORT BEACH
NE\NPORT BEACH
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
Estimated Impact on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Adual Discharge Quantities
Permit User Name
BEARING INSPECTION INC.
JAZZ. SEMICONDUCTOR
HOAG MEMORIAL HOSPITAL PRESBYTERIAN
HIXSON METAL FINISHING
RENAL RESEARCH INSTITUTE, LLC
AMETEK AEROSPACE
CITY OF NE\NPORT BEACH
BASIN MARINE INC.
UCI MEDICAL CENTER
ANGELICA TEXTILE
ST. JOSEPH HOSPITAL
GRANDE TORTILLA INC.
CHILDREN'S HOSPITAL OF ORANGE COUNTY
MARCEL ELECTRONICS INT.
WASTE MANAGEMENT OF OC TRANSFER
CHAPMAN MEDICAL CENTER
CIRTECH INC.
WEST AMERICAN RUBBER COMPANY INC.
SIERRA SPRING WATER COMPANY
STATEK CORPORATION
CONTINUOUS COATING CORPORATION
SVG THERMCO SYSTEMS INC.
PLATECORP#2, INC.
ULTRA PURE METAL FINISHING, INC.
ORANGE COUNTY PLATING CO., INC.
CIRCUIT ACCESS
VILLA PARK ORCHARDS ASSOCIATION
DUCOMMUNAEROSTRUCTURES
SOUTH COAST WATER
FOAMEX LP.
CADILLAC PLATING
HIGHTO\NER PLATING & MANUFACTURING CO.
HAMIL TON MATERIALS
DUNHAM METAL PROCESSING
QUALITY ALUMINUM FORGE# 2
SERRANO WATER DISTRICT
THERMAL-VAC TECHNOLOGY
Estimated
OCSD80%
Shara of
Property
Tax
946
43,092
41
292
18
288
218
205
182
393
1,253
180
1,183
88
290
402
583
178
118
18
55
474
2,083
299
137
473
112
19
77
Calculatad
Permit User
Fee
2004-05
Adapted
1,184
100,907
49,800
6,688
3,108
2,400
1,843
284
87,521
88,815
73,318
51,805
17,530
12,348
12,212
9,889
6,683
5,850
3,844
4,883
2,944
3,737
2,728
2,858
2,322
3.058
3,012
2,860
1,914
2,039
1,285
1,283
1,847
1,445
1,270
1,543
805
Calculated
Permit User
Fee
2004-05
Proposed
1,885
157,093
72,162
10,447
4,503
3,513
2,441
387
128,821
100,083
108,240
87,876
25,402
18,446
14,725
14,330
9,870
8,843
5,778
8,588
4,580
5,415
4,118
4,801
3,575
3,820
4,532
3,707
3,113
2,iJ59
1,980
2,015
2,388
2,319
1.833
2,827
1,312
Proposed
Cost to
Conacl
Calculation
Method
521
58,187
22,382
3,779
1,395
1,113
798
123
39,300
31,248
32,922
15,871
7,872
8,100
2,513
4,440
3,007
2,793
1,934
1,905
1,816
1,878
1,391
1,743
1,253
581
1,520
1,048
1,1S9
920
715
752
740
873
583
1,084
507
Percentage
Increase
44.7%
55.7%
44.9%
58.7%
44.9%
46.4%
48.6%
46.8%
44.9%
45.4%
44.9%
30.6%
44.9%
49.4%
20.8%
44.9%
45.1%
47.7%
50.3%
40.7%
54.9%
44.9%
51.0%
81.0%
54.0%
18.4%
50.4%
39.3%
82.6%
45.1%
58.5%
59.8%
44.9%
60.4%
44.4%
70.2%
83.0%
Total
Flow
(MG)
0.8458
257.5577
35.9838
15.7518
2.2454
2.4275
2.2182
0.3488
63.2390
89.9501
52.9765
3.2805
12.6885
21.8945
3.2328
7.1454
8.7337
7.0405
7.9708
4.8971
5.9100
2.7000
5.4129
4.8517
4.8133
1.0015
1.8421
2.9010
2.8263
1.5114
2.4991
2.5353
1.1900
1.6832
1.1122
0.7951
1.2225
Page9of 13
Total
BOD
(lbs)
1,784
12,271
75,026
894
4,882
3,124
1,894
308
131,853
85,774
110,456
137,285
28,410
10,088
39,024
14,898
9,197
8,885
2,471
7,773
1,135
5,830
1,725
383
982
10,118
3,834
4,546
211
3,030
375
117
2,481
544
1,879
28
80
Total
SS
(lbs)
1,738
12,271
75,028
2,884
4,882
3,057
1,894
251
131,853
80,148
110,458
89,118
28,410
7,439
5,542
14,898
7,949
8,885
1,228
4,278
2,030
5,630
1,289
4,108
1,294
730
5,998
1,935
3,438
3,058
1,052
1,255
2,481
2,924
1,848
5,217
1,424
H:\dept\fin\210\STREED\Excal\Pennit Usera\2002-D3 recon and rates Oct 2004.xla
9/2912004
City
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
Estimated Impact on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Adual Discharge Quantities
Permit User Name
QUALITY ALUMINUM FORGE
SF PP, L.P.
DITTY DRUM COMPANY, INC.
CIRCUIT TECH INC.
INDEPENDENT FORGE
A&A DEBURRING AND TUMBLING
PERFORMANCE POVVDER, INC.
BURLINGTON ENGINEERING INC.
GOMTECH ELECTRONICS
DATA AIRE INC. #2
KNOTTS BERRY FARM FOODS
PLACENTIA LINDA COMMUNITY HOSPITAL
FROZSUN FOODS, INC.
S.B. THOMAS INC.
CALIF CONSOLIDATED WATER PURIFICATION
EXCELLO CIRCUITS MANUFACTURING CORP.
CARTEL ELECTRONICS
HARTWELL CORPORATION
KC A ELECTRONICS, INC.
NOLLAC OIL COMPANY
GEORGE A. JONES, IMPERIAL #2 \NELL
BRIGHT ARMOUR PLATING
SUPERIOR PROCESSING
STREMICKS HERITAGE FOODS LLC
CHROMA SYSTEMS PARTNERS
IR\IVD OATS
WIMC HOSPITAL CORPORATION
EL METATE FOODS, INC.
GOGLANIAN BAKERIES
EL TORO MEAT SHOP
GEMINI INDUSTRIES INC.
MICRO SEMI CORP.
DANONE WATERS OF N. A. -SANTAANA
ORANGE COUNTY REGISTER
ITT CANNON, A DIVISION OF ITT INDUSTRIES
TTM TECHNOLOGIES #1
CULLIGAN WATER CONDITIONING
Eatlmated
OCSD60%
Shara of
Property
Tax
175
32
27
115
175
61
27
923
2,041
2,855
183
742
249
153
468
519
12
29
78
128
3,635
1,252
8,038
317
790
128
97
1,892
8.584
14,959
182
Cslculated
Permit User
Fee
2004-05
Adopted
599
712
523
350
379
316
285
239
81
543
235,396
18,483
11,382
8,386
4,588
3,085
2,309
1,579
1,248
980
723
589
285
734,507
138,852
78,280
62,205
38,901
35,725
29,093
34,181
18, 199
18,073
22,451
18,512
14,453
7,841
Cs I cu lated
Permit User
Fee
2004-05
Proposed
806
884
793
481
555
444
390
352
123
778
287,491
29,753
14,730
7,880
7,837
4,518
3,285
2,288
1,813
1,505
1,108
915
404
930,531
187,117
122,080
75,848
50,965
50,091
38,278
58,855
29,984
25,001
32,305
27,780
20,589
12,179
Proposed
Cost to
Correct
Calculation
Method
306
173
270
131
175
128
124
113
42
32,095
8,290
3,348
1,514
3,089
1,433
978
888
585
544
385
328
139
198,024
48,488
43,780
23,441
12,084
14,388
7,183
24,894
8,785
8,928
9,854
9,248
8,138
4,538
Percentage
Increase
51.1%
24.3%
51.8%
37.3%
48.2%
40.5%
48.8%
47.1%
51.2%
0.0%
13.8%
44.9%
29.4%
23.8%
87.2%
48.4%
42.3%
43.8%
45.3%
58.7%
53.2%
55.3%
52.4%
26.7%
35.0%
55.9%
44.9%
31.0%
40.2%
24.7%
72.3%
48.3%
55.5%
43.9%
50.0%
42.5%
59.4%
Total
Flow
(MG)
0.9273
0.3804
0.9733
0.3781
0.3297
0.2688
0.3088
0.2627
0.1458
0.4202
18.5558
13.3404
7.4577
1.7887
3.8178
5.4805
3.8029
1.3811
1.8194
1.9307
1.5483
1.3014
0.5574
88.9928
187.2863
207.7078
37.7209
3.8308
8.0730
4.1584
5.8713
30.4213
35.5825
18.1072
31.0324
17.7899
18.4408
Page 10of13
Total
BOD
(lbs)
477
2,042
338
845
520
548
323
293
57
858
871,488
27,815
28,384
19,044
383
3,083
3,095
2,422
1,491
259
314
185
132
2,109,895
288,230
5,235
78,848
101,844
71,184
88,921
853
18,854
4.219
35,280
15,173
21,094
388
Total
SS
(lbs)
582
298
338
215
539
343
299
293
57
734
53,200
27,815
8,818
4,113
12,879
1,254
888
1,992
887
772
314
287
111
743,727
43,329
1,770
78,848
51,273
83,186
24,979
133,808
11,731
8,009
32,482
13,852
11.125
8,248
H:\dept\fin\210\STREED\Excel\Permlt Users\2002-03 recon and rates Ocl 2004.xla
9/2912004
City
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
Estimated Impact on Permit Users by Flow. BOD and SS
Based Upon 2002-03 Actual Discharge Quantities
Permit User Name
MEDTRONIC HEART VALVES, INC.
INTERNATIONAL FOOD SOLUTIONS, INC
UNIVERSAL CIRCUITS INCORPORATED
ASTECH ENGINEERED PRODUCTS
EMBEE INC. #2
BURROWS IND. OBA MINUTEMAN PUMPING
PIONEER CIRCUITS
ALPHANETICS INC.
MARKLAND MANUFACTURING, INC.
TTM TECHNOLOGIES, INC
FABRICATION CONCEPTS CORPORATION
EMBEE INC. #1
TEXTRON AEROSPACE
ANOMIL ENT. OBA DANCO METAL SURFACING
ANODYNE INC.
EMBEE INC. #3
ALUMINUM FORGE· DIV. OF ALUM. PRECISION
WEBER PRECISION GRAPHICS
CHROME TECHNOLOGY, INC.
SOUTH COAST CIRCUITS #3
RICOH ELECTRONICS #2
ALUMINUM PRECISION PRODUCTS INC. CENTRAL
DATA ELECTRONIC SERVICES INC.
ACTIVE PLATING INC.
INTEGRATED AEROSPACE, INC.
GALLADE CHEMICAL INC.
ACCURATE CIRCUIT ENGINEERING
ALUMINUM PRECISION PRODUCTS INC.-SUSAN
VERTEQ PROCESS SYSTEMS INC.
REID METAL FINISHING
RB C TRANSPORT DYNAMICS CORP.
SOUTH COAST CIRCUITS #4
ELECTROSERVICES 2000 INC.
ALMATRON ELECTRONICS, INC.
BRASSTECH, INC
SOUTH COAST CIRCUITS #2
PLEION CORPORATION #2
Eatlmated
OCSD80%
Shara of
Property
Tax
527
712
847
118
25
177
315
102
487
842
778
30
4,539
150
24
30
184
182
217
63
795
75
178
83
124
134
298
72
174
107
798
Celculated
Permit User
Fee
2004-05
Adopted
9,143
9,842
8,839
8,271
8,424
8,092
8,204
5,049
4,881
5,588
5,379
3,184
5,400
3,488
3,307
2,958
3,779
2,940
2,231
2,169
2,718
2,320
1,787
1.888
2,127
1,762
1,818
1,895
1,427
1,188
1,418
880
951
1,054
1,285
1,042
1,058
Celculated
Permit User
Fee
2004-05
Proposed
12,795
11,855
10,884
9,819
9,924
10,014
9,108
7,397
7,387
8,274
8,082
4,951
7,989
5,284
5,284
4,493
8,101
3,580
3,428
3,205
3,897
3,108
2,883
2,535
3,089
2,548
2,379
2,487
2,138
1,752
2,058
1,510
1,417
1,554
1,833
1,405
1,580
Proposed
Cost to
Correct
Celculatlon
Method
3,852
2,012
3,825
3,347
3,500
1,922
2,902
2,348
2,488
2,888
2,704
1,787
2,589
1,797
1,977
1,537
2,322
819
1,195
1,037
1,181
788
888
849
943
798
582
792
709
588
839
520
488
489
588
383
502
Percentage
lncraase
39.9%
20.4%
55.9%
63.4%
54.6%
23.8%
48.8%
48.5%
50.9%
48.1%
50.3%
58.5%
47.9%
51.5%
59.8%
52.0%
81.4%
21.1%
53.5%
47.8%
43.5%
33.9%
48.2%
50.4%
44.3%
45.4%
31.0%
48.7%
49.7%
60.3%
45.0%
52.5%
48.9%
47.4%
44.9%
34.8%
47.4%
Total
Flaw
(MG)
7.1975
2.8088
14.0830
13.9890
13.4831
2.7788
9.7955
9.3168
9.0452
8.8748
5.5891
7.0848
7.0782
5.4462
5.8840
6.0751
2.2288
1.0217
3.8819
3.5930
1.7501
1.5788
3.1141
3.2738
1.5510
1.9848
1.3752
1.7843
2.1927
1.9402
1.0328
2.2302
2.1012
1.7311
0.9141
1.2738
1.0439
Page 11of13
Total
BOD
(lbs)
18,359
31,450
2,053
2,449
2,396
24,011
8,549
4,891
3,370
8,207
5,855
828
5,873
2,879
845
1,812
2,011
9,209
1,278
2,084
4,412
5,120
1,832
1,183
3,274
2,303
4,283
2,144
1.271
939
2,122
431
841
1,048
1,906
2,019
1,319
Total
SS
(lbs)
10, 187
4,153
4,802
2,124
3,800
4,813
4,053
1,877
2,977
8,337
8,054
1,898
5,583
3,417
4,441
1,327
10,307
1,151
2,027
1,389
4,085
1,955
1,021
798
3,108
1,880
1,027
2,115
1,271
910
2,142
255
73
854
1,908
297
1,449
H:\depl\ftn\210\STREEO\Excel\Permit Use111\2002-03 racon and rates Ocl 2004.xls
912912004
City
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SEAL BEACH
SEAL BEACH
STANTON
STANTON
TUSTIN
Estimated lmpad on Permit Users by Flow, BOD and SS
Based Upon 2002-03 Actual Discharge Quantities
Permit User Name
L & N UNIFORM SUPPLY COMPANY,INC.(CLEAN)
WHEEL SERVICES GROUP, INC
SOUTH COAST CIRCUITS, INC.
PACIFIC QUARTZ, INC.
SOUTH BAY CHROME SALES/CHROME EFFECTS
ORANGE CONTAINER, INC.
MASK TECHNOLOGY INC.
SELECT CIRCUITS
SP S TECHNOLOGIES
E F T FAST QUALITY SERVICE, INC.
SANTA ANA PLATING (CNK CAPITAL)
CAL-TRONICS CIRCUIT INC. -SANTA ANA
LAM-PLATE TECH INC.
CL YMPIC POWDER COATINGS INC.
GORILLAS POLISHING AND PLATING
MARGARETIS TEXTILE SERVICE
MARK OPTICS INC.
BA F INDUSTRIES
PRECIOUS METALS PLATING
STRIP CLEAN COMPANY
PRECISION CIRCUITS \NEST INC.
AQUA-CON COMPANY
ALLOY TECH ELECTROPOLISHING INC.
MEDEVA PHARMACEUTICALS CA, INC.
VICTORY CIRCUITS INC.
X Z X ELECTRONICS
AUTO-CHLOR SYSTEM OF WASHINGTON, INC.
A&K DEBURRING AND TUMBLING
DATA SOLDER INC
HI-TECH STENCILS
LAM LIGHTING INC.
PRECISION PO\NDERCOATING INC.
NAVAL \NEAPONS STN SEAL BCH CD 043
ACCURATE METAL FABRICATORS
ALL METALS PROCESSING OF O.C. INC.
PURE-CHEM PRODUCTS COMPANY INC.
CITY OF TUSTIN WATER SERVICE (17TH ST.)
Estfmated
OCSDSO%
Shara of
Property
Tax
79
88
128
128
278
2,954
88
44
118
108
150
233
88
231
83
14
50
152
131
97
82
2,040
138
290
70
calculated
Permit User
Fee
2004-0S
Adopted
1,138
822
802
992
803
994
812
849
3,103
471
549
433
379
453
389
501
459
425
332
328
348
310
280
288
204
158
189
141
90
35
911
114
7,298
3,538
2,180
234
38,081
Calculated
Permit User
Fee
2004-05
Proposed
1.844
1,293
1,222
1,445
1,229
1,472
902
875
4,595
738
795
825
580
885
574
728
708
808
500
501
512
478
385
385
257
212
212
200
130
51
1,324
188
10,575
5,124
3,238
344
58,810
Proposed
Cost to
Correct
Calculation
Method
508
471
420
453
427
478
290
228
1,492
287
248
192
181
212
185
225
249
184
187
173
184
188
128
119
53
54
43
59
40
18
28
3,277
1,588
1,058
110
20,529
Percentage
ll"ICl8898
44.7%
57.3%
52.3%
45.6%
53.2%
48.1%
47.4%
34.8%
48.1%
58.8%
44.9%
44.2%
47.8%
48.7%
47.4%
44.9%
54.2%
43.3%
50.4%
52.9%
47.0%
53.6%
48.3%
44.9%
25.7%
34.5%
25.6%
42.3%
44.9%
44.8%
0.0%
20.4%.
44.9%
44.9%
48.4%
48.8%
58.9%
Total
Flaw
(MG)
0.7479
1.5819
1.5479
0.8499
1.4043
0.8319
0.9916
0.7883
3.9208
0.9800
0.3985
0.8315
0.7248
0.5203
0.6832
0.3822
0.4100
0.4151
0.8052
0.8097
0.4882
0.8081
0.4538
0.1921
0.1475
0.1524
0.0545
0.1008
0.0848
0.0272
0.8880
0.1593
5.2734
2.5550
2.9329
0.1891
98.3091
Page 12of 13
Total
BOD
(lbs)
1,753
219
459
1,400
475
1,338
811
1,280
3,404
122
827
548
327
557
388
755
395
840
243
184
388
149
232
401
551
324
483
235
135
53
1,339
143
10,995
5,327
2,273
317
19
Total
SS
(lbs)
1,781
773
493
1,389
700
1,799
397
190
3,404
357
827
272
129
518
192
755
880
472
204
240
303
203
148
401
55
88
121
189
135
51
1,394
84
10,995
5,327
2,239
380
2,428
H:\depl\fin\210\STREED\Excel\Permft Usera\2002-Q3 racon and rates Oct 2004.xla
9/29/2004 Estimated Impact on Permit Users by Flow, BOD and SS Page 13of 13
Based Upon 2002-03 Actual Discharge Quantities
Estimated Calculated Calculated Proposed
OCSD80% Permit User Permit User Cost to Total Total Total
City Permit User Name Shara of Fee Fee Coned Percentage Flaw BOD SS Property 2004-05 2004-0S Calculation Increase
Tax Adopted Proposed Method (MG) (lbs) (lbs)
TUSTIN CITY OF TUSTIN, WATER SERVICE (MAIN ST.) 7,625 11,923 4,299 56.4% 19.2910 882 1,488
TUSTIN TUSTIN HOSPITAL AND MEDICAL CENTER 8,252 11,958 3,705 44.9% 5.9827 12,432 12,432
TUSTIN CITY OF TUSTIN -MAINTENANCE YARD 582 845 283 45.1% 0.4317 885 873
TUSTIN TOYOTA RACING DEVELOPMENT #2 242 528 759 233 44.4% 0.4088 798 741
TUSTIN CHEEK ENGINEERING & STAMPING 244 307 439 132 43.0% 0.3871 442 281
TUSTIN VVESCO SERVICES 110 139 29 28.8% 0.0722 293 43
TUSTIN REVERE TRANSDUCERS, INC. 1,184 1,024 1,508 323 27.3% 1.2217 1,202 1,152
VVESTMINSTER VENCOR INC OBA VENCOR HOSP-ORANGE COUNTY 1,284 8,184 11,831 3,888 44.9% 5.8993 12,300 12,300
VVESTMINSTER LINDBERG HEAT TREATING CO.-ALUMATHERM 708 2,180 3,305 1,125 51.6% 4.0551 1,408 1,408
WESTMINSTER SOUTHERN CALIFORNIA EDISON 1,528 2,228 700 45.8% 1.3820 2,114 2,099
YORBA LINDA AERA ENERGY LLC 284 184,954 283,470 98,518 53.3% 440.4840 62,594 29,538
YORBA LINDA METRO WATER DISTRICT OF SO CA 2,690 3,902 1,212 45.1% 2.0152 3,995 4,000
YORBA LINDA PLEGEL OIL COMPANY (BLATTNER -AH.A) 188 788 1,222 437 55.8% 1.9893 115 131
YORBA LINDA COLUMBINE ASSOCIATES 12 ea 101 33 48.2% 0.1483 50 5
YORBA LINDA SHERWIN D. YOELIN 8 85 99 34 52.9% 0.1510 25 12
Total for Permit Uaara 904,415 8,490,883 11,478,853 2,913,020 34.0% 8,117.8307 17,914,101 7,478,311
Total for All OCSD 28,000,000 102, 752,685 91,250.0000 173,514,000 177,014,000
Permit User Percent of Total for All OCSD 11% 7% 10% 4%
Average Permit User 2,001 18,785 25,396 8,445 34.3% 13.5350 39,833 18,545
Average Single Family Residence 115 0.0923 159 169
H:\dept\fin\210\STREEO\Excel\Permll Usera\2002-03 recon and rates Ocl 2004.xls
912912004
City
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
Permit User Name
Flaw Rate per MR!lon Gallons
BOD Rate per 1000 Pounds
SS Rate per 1000 Pounds
ALSTYLE APPAREL-ACTIVEWEAR MFG. CO. INC.
MC P FOODS INC.
NOR-CAL BEVERAGE CO. INC. (MAIN)
NOR-CAL BEVERAGE CO. INC. (TETRA)
DISNEYLAND RESORT -DCA
EXPO DYEING AND FINISHING INC.
SUNDOR BRANDS INC. A PROCTER & GAMBLE CO
STEPAN COMPANY
STEINER CORP. OBA AMERICAN LINEN SUPPLY
PRECISION ANODIZING AND PLATING INC.
ANAHEIM MEMORIAL MEDICAL CENTER
DYNAMIC DETAILS INC.
SIOUX HONEY ASSOCIATION CO-OP
DON MIGUEL MEXICAN FOODS INC.
KC A ELECTRONICS INC.
\NEST ANAHEIM MEDICAL CENTER
HARRYS DYE & WASH INC
TAC \NEST, INC.
CITY OF ANAHEIM -WATER SERVICES
U.W.M.C. HOSPITAL CORPORATION
BRIDGFORD FOODS CORPORATION
\NEYERHAEUSERCOMPANY
IDEAL ANODIZING INC.
MUL Tl-FINELINE ELECTRONIX INC.
S & S POLISHING/PLATING
ANAHEIM GENERAL HOSPITAL
DANONE WATERS OF N. A. -ANAHEIM
DRS TECHNOLOGIES INC
ARTISTIC PLATING & METAL FINISHING INC.
DELPHI AUTOMOTIVE SYSTEMS
INTEC PRODUCTS INC.
HAWK INDUSTRIAL UNIFORM
MICROMETALS INC. #2
UNIVERSAL ALLOY CORP.
CEROMET INC.
AMERICAN CIRCUIT TECHNOLOGY INC.
PRIVATE LABEL LABORATORIES
COPPER CLAD MULTILAYER PRODUCTS INC.
Estimated lmpad on Permit Users to 2007-08
Based Upon 2002-Q3 Actual Dllchargea
Eaflmafed
OCSD60%
Share of
Property
Tax
3,876
251
1,898
810
858
6,122
2,870
308
28
890
303
3,217
1,968
182
3,883
788
7,751
284
847
11
1,997
858
1,093
280
2,234
219
114
792
855
311
322
413
2002-o:J
Total
Flaw
(MG)
380.8538
18.4887
38.9144
23.3847
84.7448
105.4495
27.1223
7.3083
21.5522
34.7895
33.3875
48.6487
2.1595
14.4228
39.2034
18.7858
21.0879
11.8491
8.0758
10.8352
9.1297
9.1183
8.8476
16.1814
13.7040
7.8434
17.9175
13.0501
11.4455
9.9885
3.9458
6.9484
6.2781
6.8353
2.0917
8.8485
0.2325
5.0918
2002-o:J
Total
BOD
(lbs)
1,541,380
1,554,057
827,333
640,448
197,543
181,547
380,115
210.S97
135,248
1,835
69,813
28,888
140,914
78,233
10,308
34,898
25,138
48,892
95
22,174
27,877
28,073
718
9,990
873
18,582
995
4,543
6,004
4,398
&09
10,089
8,325
6,350
15,012
2,445
18,055
1,603
2002-o:J
Total
SS
(lbs)
501,739
48,840
122,382
33,930
197,543
34,471
34,457
847
39,368
168,489
69,813
28,318
1,148
35,480
9,990
34,898
14,600
11,789
71,858
22,174
19,171
18,304
41,707
7,528
19,377
18,582
554
4,543
4,835
4,871
29,197
7,830
3,899
2,984
1,948
2,232
1,151
4,034
• • •
388.68 •
248.55 •
238.45 •
836,874
403,608
249,159
161,038
131,125
87,239
107,719
65,217
50,847
51,018
48,207
31,035
38,094
33,221
19,393
23,231
17,502
18,710
19,350
14,719
14,885
13,728
13,385
9.888
9,888
10,993
8,983
7,022
8,815
6,938
8,543
8,683
4,448
4,113
4,968
3,690
4,848
3,237
2004-05
Proposed
677.30 •
270.88 •
414.27 •
833,278
449,574
297,107
173.844
190,003
118,884
127,408
81,618
85,380
88,175
68,958
48,383
39,885
44,201
29,580
33,883
26,027
24,247
33,219
21,328
20,758
18,075
22,580
14,576
18,175
16,930
10,843
10,845
9,985
8,974
14,611
9,404
8,373
6,929
8,078
6,423
6,488
5,045
2005-08
Estimated
837.55 •
288.60 s
432.14 •
891,438
479,098
318,382
185,480
202,782
128,732
138,076
85,725
69,772
91,132
71,452
60,185
42,627
47,098
32,284
35,923
27,008
25,992
34,887
22.780
22,148
20,380
23,871
15,801
17,382
17,000
11,950
11,594
10,830
9,741
15,280
10,082
8,873
8,417
8.608
5,907
5,855
6.452
Page 1of13
2008-07
Estimated
711.27 s
311.21 s
454.19 •
984,093
516,839
340,738
200,238
218,589
140,935
147,012
71,083
75,301
97,228
77,029
54,892
45,912
50,720
35,829
38,727
29,454
28,171
38,897
24,537
23,877
22,003
25,459
17,311
18,820
18,328
13,305
12,759
11,894
10,884
18,228
10,922
7,492
7,019
7,044
8,502
8,307
5,953
2007-0S
Estimated
773.32
330.53
473.50
1,025,940
648,590
381,500
212,784
232,099
161,285
158,318
75,800
SQ,011
102,479
81,780
68,881
48,790
53,812
38,453
41,121
31,530
30,023
38,880
28,053
25,352
23,388
28,828
18,590
20,081
19,459
14,447
13,744
12,794
11,483
17,044
11,838
8,017
7,629
7,502
7,005
8,693
8,378
H:\dept\tln\210\STREED\Excel\Permll Usera\2002-o:J mean and rates Oct 2004.xla
9/2912004
City
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
Permit User Name
Flaw Rate per Mllllon Gallone
BOD Ride per 1000 Pounds
SS Rate per 1000 Pounds
LINCO INDUSTRIES INC.
MAGNETIC METALS CORP
Y K K (U.S.A) INC.
J & H DEBURRING INC. #2
BLACK OXIDE INDUSTRIES INC.
AP W ENCLOSURE SYSTEMS, LLC
CLASSIC PLATING INC.
ANAHEIM PLATING & POLISHING INC.
BOEING COMPANY· BLDG. 271
GENERAL CERAMICS LLC
SMT DYNAMICS
CALIFORNIA CUSTOM SHAPES, INC.
CREST COATING INC.
MILBANK WEST INC.
ESSEX ELECTRIC INC
GUNTHER ATHLETIC SERVICE
MURRIETTA CIRCUITS INC.
ECONOLITE CONTROL PRODUCTS INC.
CYTECH ENGINEERIED MATERIALS
STAINLESS MICRO-POLISH INC.
ADVANCE TECH PLATING INC. #2
NEVILLE CHEMICAL COMPANY
UOPLLC
KINSBURSKY BROTHERS SUPPLY INC.
SUPERIOR PLATING
TAORMINA INDUSTRIES INC.14
PRECISION PAINTING
AMERIMAX BUILDING PRODUCTS INC.
ALLIED PACIFIC METAL STAMPING
LEACH INTERNATIONAL
NU-TEC POWDER COATING
I PC CAL FLEX INC.
JELLCO CONTAINER INC.
ANAHEIM TRUCK DEPOT #2 BIN WASH
SECHRIST INDUSTRIES, INC.
ELECTRORACK PRODUCTS CO. INC.
RT I ELECTRONICS, INC.
TAYLOR-DUNN MANUFACTURING COMPANY
Estimated lmpad on Permit Users to 2007-08
Based Upan 2002-03 Actual Dllcharges
Esflmaled
OCSDsm&
Share of
Pro petty
Tax
84
944
2.284
25
55
488
98
1.608
188
272
250
815
22
88
353
83
128
0
71
624
284
288
478
158
198
123
578
524
471
8
1,484
2002-03
Total
Flow
(MG)
3.2895
1.8881
5.8158
1.3247
4.5814
2.7002
3.9877
3.8712
2.1347
2.7983
1.8384
1.5832
1.3333
1.8581
1.7835
2.6582
2.1761
1.4443
1.1798
2.3054
1.7248
1.eess
1.8723
1.4811
1.9708
0.9878
0.3788
1.4787
0.5544
1.8300
0.8009
0.8800
0.8923
0.8183
0.5401
0.5818
0.5217
1.2090
2002-03
Total
BOD
(lbs)
577
8,253
2,184
4,837
597
4,060
1,014
1,605
3,712
458
3,402
5,892
5,574
3,053
3,452
1.718
1.708
2,559
2,372
833
804
700
835
1,197
325
2,138
760
244
3,238
285
1.820
1.729
1.180
1.285
1,117
1,201
1,024
2,480
2002-03
Total
SS
(lbs)
10,910
5,781
1.218
8,938
1,924
2,883
1,288
1,320
3,827
4,712
3,402
816
1,145
2,200
1,889
1,373
1,798
2.259
2,373
309
1,831
857
835
1,182
325
1,218
4,828
1,818
513
498
1,340
428
1,701
1,285
1,447
999
1,029
2,432
• • •
389.58 •
248.55 •
238.45 •
3,981
4,048
2,903
3,821
2.298
2,838
2,024
2,087
2,574
2.288
2,333
2,182
2,150
1,988
1,958
1,698
1.854
1,707
1,580
1,155
1,175
1.058
999
1,113
885
1,178
1,478
890
1,132
790
993
848
949
853
822
744
892
1,842
2004-05
Proposed
577.30 •
270.68 •
414.27 •
8,581
6,594
4,338
5,778
3,803
3.781
3,102
3,101
3,740
3,690
3,390
2,792
2,753
2,811
2.735
2,509
2,481
2.482
2,308
1,711
1,835
1,698
1.518
1,848
1.381
1,842
2.422
1,588
1,409
1,224
1,395
.1,141
1,418
1.238
1.214
1,083
1.005
2,377
837.55 s
288.60 •
432.14 •
8,885
6,848
4,737
8,102
3,824
4,044
3,383
3,374
3,999
3,951
3,822
3,003
2,853
3,018
2,938
2,718
2.855
2,835
2,482
1,872
1,979
1.741
1,852
1,778
1.481
1,760
2,545
1,710
1.509
1,338
1,487
1,231
1,511
1,318
1,292
1,137
1,073
2,537
Page 2of 13
2006-07
Estfma!ed
711.27 •
311.21 •
454.18 •
7,482
8,384
5,227
8,508
4,318
4,394
3,728
3,710
4,321
4,271
3,810
3,287
3,203
3,271
3,187
2,978
2.894
2.850
2,656
2.070
2,158
1,817
1,818
1,939
1,851
1,907
2,698
1.860
1,835
1,473
1.802
1,343
1,828
1,422
1,389
1,227
1,157
2,738
2007-0S
Estimated
773.32
330.63
473.50
7,808
8,760
5,842
8,854
4,851
4,691
4,019
3,995
4,595
4,645
4,155
3,481
3,415
3,488
3,399
3,194
3,098
3,033
2,820
2,237
2,308
2,065
1.959
2,075
1,788
2.032
2.828
1,888
1,742
1.580
1.701
1.438
1.724
1,510
1,472
1,305
1,229
2,908
H:\dep1\fln\210\STREED\Excel\Perm! Usel'l\2002-03 recon and rates Cd 2004.xll
912912004
City
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
ANAHEIM
BREA
BREA
Permit User Name
Flaw Raia per Mnllon Gallons
BOD Rate per 1000 Pounds
SS Raia per 1000 Pounds
MILLENNIUM CIRCUITS SERVICES CORP
PICOFARAD INC.
RTR INDUSTRIES
RIGIFLEX TECHNOLOGY INC.
LINVATEC CORPORATION
PACIFIC UTILITY PRODUCTS INC.
IKON POWDER COATING
BRIDGEMARK CORP·D0\\11.ING #2
AQUARIAN COATINGS CORP
ARO SERVICE
PRECON, INC.
A& R POWDER COATING INC.
ANAHEIM EXTRUSION CO. INC.
UNITED CUSTOM POLISHING & PLATING
ADVANCE TECH PLATING INC.
POWDERCOAT SERVICES INC. #1
PACIFIC IMAGE TECHNOLOGY, INC.
SM T DYNAMICS LLC
ELECTRO METAL FINISHING CORPORATION
EXQUISITE DESIGNS INC.
POWDERCOAT SERVICES INC. #4
PO\WERCOAT SERVICES INC. #2
ACROBURR INC. #2
POWDERCOAT SERVICES INC.13
MTS MICROELECTRONICS INC.
OLIVE OIL CO.
DETAILS INC 13, OBA DYNAMIC DETAILS INC.
TECHPLATE ENGINEERING CO. INC.
TRANSLINE TECHNOLOGY INC.
REMEDY ENVIRONMENTAL SERVICES
CUSTOM POWDER COATINGS
VEECO ELECTRO FAB INC. #2
ALL METAL PAINT STRIPPING INC. 12
AP W ENCLOSURE SYSTEMS LLC SOUTH
H. KOCH & SONS COMPANY
DISNEYLAND RESORT
HEAL TH CARE APPAREL SERVICES
GERARD TILE
Estimated lmpad on PermH Users to 2007-08
Based Upon 2002..Q3 Adual Dllc:halga
Estimated
OCSD80%
Share of
Pmperty
Tax
82
48
87
38
189
21
243
34
589
49
25
91
25
55
85
100
213
89
598
4,473
492
659,204
442
890
2002-03
Total
Flaw
(MG)
0.6159
0.5654
0.3975
0.8432
0.3281
0.5937
0.3839
0.7155
0.2813
0.2982
0.2709
0.4815
0.4888
0.4088
0.4279
0.3058
0.4080
0.2582
0.1443
0.2938
0.2006
0.1170
0.1728
0.1214
0.0937
0.1207
0.0887
0.0813
0.3958
0.0225
0.0189
0.1848
0.0437
2.6900
0.3262
354.5820
16.5040
4.7318
2002-m
Total
BOD
(lbl)
1,299
829
829
508
884
235
722
587
474
573
187
943
197
78
284
97
178
292
27
127
244
106
168
194
95
181
108
150
47
39
41
154
1,227
212
731,345
23,419
2,801
2002-m
Total
SS
(lbs)
181
792
829
234
884
347
344
587
493
384
154
993
181
173
249
94
178
283
27
127
244
131
188
193
78
181
128
158
47
39
41
144
1,678
212
731,345
12,349
53.895
• • •
2004-05
Adopted
388.58 •
248.66 •
238.45 •
661
664
660
419
464
380
398
284
389
345
334
253
651
243
218
238
197
180
188
121
138
182
121
128
129
88
120
80
221
31
28
88
89
1,838
223
488,867
14,480
15,291
677.30 •
270.88 •
414.27 •
718
825
797
808
858
660
648
413
584
504
470
381
948
384
340
351
301
289
271
188
203
235
183
184
187
127
174
118
335
45
38
134
128
2,481
333
705,835
20,405
25,817
2005-08
Estimated
837.55 •
288.50 •
432.14 s
773
884
851
858
702
598
589
458
802
539
504
414
1,012
398
370
379
329
290
290
207
219
250
197
197
199
137
185
125
384
48
40
147
134
2,687
381
763,100
21,977
27,116
Page3of 13
711.27 •
311.21 •
454.19 •
844
958
917
722
757
853
840
509
849
582
545
458
1,091
434
407
413
383
317
313
230
240
270
216
214
215
150
200
135
400
52
44
182
144
2.941
394
811,976
23,924
28,718
2007.0S
e.tfmated
773.32
330.63
473.50
905
1,020
974
778
804
701
683
553
689
819
680
491
1.158
487
438
442
392
340
332
249
257
287
231
228
228
181
212
144
431
55
48
176
153
3,166
423
882,229
25,577
30,104
H:\depMn\210\STREED\Exr:el\Permll Uum\2002-G3 racan and ndel Oct 2004.xls
912912004
Clly
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BREA
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
BUENA PARK
COSTA MESA
Permit User Name
Flaw Rate per Mlllkm Gallons
BOD Rafe per 1000 Pounds
SS Rafe per 1000 Paundl
COOPER AND BRAIN INC.
WINONICS (BREA)
HARTE-HANKS SHOPPERS
KIRKHILL RUBBER CO (SOUTH)
ELECTRONIC PRECISION SPECIAL TIES INC.
BREA COMMUNITY HOSPITAL
CRCRIMINC
BRISTOL INDUSTRIES
FINELINE CIRCUITS & TECHNOLOGY INC.
SCISOREK & SON FLAVORS, INC.
HARBOR TRUCK BODIES INC.
MORAVEK BIOCHEMICALS INC.
CENTRAL PO\WER COATING
ENGRAVERS INK CO
KIRKHILL RUBBER CO (SOUTH)
AERA ENERGY LLC #2
DEAN FOODS CO. OF CALIF. INC(MILK PLANT)
SABA TEXTILES INC.
SEVEN-UP BOTTLING COMPANY
AMERIPEC INC.
DEAN FOODS CO. OF CALIF. INC.(ICE CREAM)
PEPSI-COLA BOTTLING GROUP
KU A TEXTILES INC.
SUNCLIPSE, INC. OBA CORRU KRAFT II
CLEUGH'S RHUBARB COMPANY
ULTRA WHEEL COMPANY
PRIMATEX INDUSTRIES OF CA INC
GEORGIA PACIFIC CORPORATION
CROCKETT CONTAINER CORP.
MEAD PACKAGING
TRIM-LOK/ R.T.P.
HANSON-LORAN CO., INC.
ALLOY DIE CASTING CO.
WEYERHAEUSER COMPANY t2
GENERAL CONTAINER CORPORATION
GARDNER LITHOGRAPH, INC.
DERM COSMETICS LAB'S INC.
WEST NEWPORT OIL COMPANY
Estimated lmpad on Permit Users to 2007-08
Based Upon 2002-Q3 Actual Discharges
Elffma1ed
OCSD60%
Share of
Property
Tax
4
603
1,330
82.8
121
3,175
1,590
884
118
375
378
3
85
1,028
248
1,418
1,009
768
584
815
3,837
850
2,347
218
1.212
335
3,808
878
1,908
959
278
458
349
327
169
0
2002-03
Total
Flaw
(MG)
15.4892
18.1971
4.8353
8.0498
8.4544
3.5041
6.2437
4.3768
1.0779
0.8409
0.4984
0.8824
0.2652
0.1137
0.0821
38.2970
129.0030
34.8324
22.1770
10.1385
18.6449
28.8471
10.7188
10.3142
15.9033
12.8380
2.6314
0.8970
1.9054
3.8847
1.1809
1.7335
0.6313
0.4284
0.4078
0.1070
43.9588
2002-m
Total
BOD
(lbs)
9,708
6,180
21.083
9,830
489
7,308
3,313
2,394
2.828
3,114
981
281
570
64
171
488,307
213,403
405,378
332,831
181,045
189,788
60,339
71,270
88,100
11,086
8,273
21.288
16,481
8,879
1,378
5,872
2,222
1,108
813
685
1,047
174,688
2002-m
Total
SS
(lbl)
2,990
3,760
7,906
10,212
2,280
7,308
3,526
2,809
298
418
918
281
147
260
171
183,226
100,129
30,279
22,680
79,231
28,282
60,808
87,382
17,371
10,244
14,788
3,772
1.108
3,471
1.378
911
1,915
1,108
709
685
185
18,133
• • •
2004.os
Ada pied
388.58 •
248.55 s
238.45 •
8,839
8,152
8,902
7,795
3,784
4,850
3,597
2.830
1,121
1,184
841
371
274
115
0
114
169,434
124,485
120,741
98,278
87,828
SD.274
35,269
37,727
29,344
11,060
9,817
7,119
4,444
3,240
2,095
2,112
1,848
735
529
484
339
83,944
577.30 •
270.68 •
414.27 •
12,814
12,308
11,788
11,484
5.960
7,027
5,384
4,265
1.458
1,602
927
581
388
184
0
185
218,490
173,718
142,284
112,239
87,680
72,985
51,327
53.385
38,458
18,426
15,235
8,781
5,189
4,400
3,174
2,849
2,395
1,085
781
704
413
80,173
2005-08
Estimated
837.55 •
288.60 •
432.14 •
13,975
13,441
12,575
12,323
8,519
7,489
5,822
4,608
1,573
1.815
991
810
397
198
0
178
230,059
187,082
152,118
119,910
92,933
77,934
64,870
68,605
38,922
17,784
18,384
9.380
&.519
4,699
3,458
2,841
2,574
1,137
814
753
442
8U59
Page4of 13
2008-a7
Estimated
711.27 •
311.21 •
464.19 •
15,404
14,838
13,585
13,381
7,204
8,084
8,382
5,042
1,719
1,757
1,070
871
433
211
0
189
247,117
203,847
184,643
129,600
99,539
84,191
59,260
60,399
42,021
19,414
17,799
10,132
6,981
5,073
3,802
3,081
2,794
1,228
880
814
477
93,868
2007-08
Estimated
773.32
330.63
473.60
18,811
18.013
14,444
14,243
7,783
8,584
8.819
5,410
1,842
1,878
1.137
722
483
224
0
201
281,693
217,708
175,108
137,842
105,198
89,518
83,003
83,742
44,860
20,813
19,003
10,773
8,337
S,391
4,095
3.288
2,881
1,302
938
868
607
100,319
H:\dept\fln\210\STREED\Excel\Pennll Uaens\2002-Q3 recan and ra1es Oct 2004.xla
912912004
City
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
COSTA MESA
CYPRESS
Permit User Name
Flaw Rate per Miiiian Gal!ont
BOD Rate per 1000 Pounds
SS Rate per 1000 Pounds
FAIRVIEW STATE HOSPITAL
LOS ANGELES TIMES COMMUNICATIONS LLC
IC N PHARMACEUTICALS INC.
VELIE CIRCUITS INC.
SANMINA CORPORATION (AIRWAY)
MESA CONSOLIDATED WATER DISTRICT
SANMINA CORPORATION (REDHILL)
EATON CORPORATION
TOYOTA RACING DEVELOPMENT
PRIME TECHNOLOGIES, INC.
SEMICOA SEMICONDUCTORS
CRITERION MACHINE \NORKS
RAILMAKERS, INC.
IRVINE SENSORS CORP.
AVIATION EQUIPMENT STRUCTURES, INC.
BOIENG COMPANY (CYPRESS)
CYPRESS TAYCO ENGINEERING, INC.
CYPRESS HVATT DIE CASTING & ENGINEERING CORP.
FOUNTAIN VALLEY PRO-TECH
FOUNTAIN VALLEY PAYTON TECHNOLOGY CORP
FOUNTAIN VALLEY KODAK PROCESSING LABS
FOUNTAIN VALLEY OMNI METAL FINISHING, INC.
FOUNTAIN VALLEY CUSTOM ENAMELERS INC.
FOUNTAIN VALLEY SANMINA CORPORATION
FOUNTAIN VALLEY UNITED CIRCUIT TECHNOLOGY INC.
FOUNTAIN VALLEY KENLEN SPECIALITIES INC.
FOUNTAIN VALLEY A & G ELECTROPOLISH
FULLERTON KIMBERLY-CLARK \\ORLDWIDE, INC.
FULLERTON FULLERTON CULTURED SPECIAL TIES
FULLERTON DAE SHIN USA, INC.
FULLERTON VAN LAW FOOD PRODUCTS, INC.
FULLERTON Y2K TEXTILE CO., INC.
FULLERTON CALIF STATE UNIV@ FULLERTON
FULLERTON FAIRCHILD FASTENERS
FULLERTON WORLD CITRUS WEST
FULLERTON ST. JUDE MEDICAL CENTER
FULLERTON ORANGE COUNTY METAL PROCESSING
FULLERTON BECKMAN COULTER, INC.
Estimated lmpad on PennH Users to 2007-08
Based Upon 2002-03 .Ada.ml Dlscharge8
Eatfmated
OCSD60%
Share of
Property
Tax
8,298
2,585
88
1,571
1,061
192
242
246
137
140
51
699
535
888
830
143
130
143
118
57
128
187
19,607
859
1.180
554
1.998
833
1,811
50
8,432
2002-03
Total
Flaw
(MG)
32.8890
10.5488
18.5838
8.5218
7.8882
4.8293
6.4701
2.4884
2.2852
2.0057
1.9849
0.3285
0.0976
0.2918
0.2834
1.2994
0.8582
0.5373
15.2290
13.8517
9.9591
10.CJB12
1.1772
1.1513
0.8111
0.6838
0.5794
461.8799
31.4260
132.8300
4.6960
119.7883
98.2000
28.2354
8.3974
12.7750
19.8508
14.4015
2002-03
Total
BOD
(lbs)
157, 171
60,439
5,421
4,055
1,823
1,778
1,218
2,665
4,319
5,188
1,191
485
203
314
585
2,709
1,732
1.120
8,011
5,292
10,882
784
784
1,301
698
278
94
201,519
518,277
199,711
440,157
219,995
81,899
23,849
82,474
28,838
388
15,983
2002-03
Total
SS
(lbs)
78,448
7.405
5,421
2,008
2.300
6,621
908
8,437
4,185
738
1,191
661
203
283
588
2.709
1,298
1,120
2,738
5,292
3,118
3,048
768
148
483
219
174
422,093
117,289
118,954
187,838
48.358
81,424
27,310
14,838
28,838
25,641
17,088
• • •
388.58 s
248.55 •
238.46 •
89,893
20,878
9,482
4.828
3,785
3,484
2,535
3,093
2,908
2,200
1.312
387
135
248
380
1,798
983
744
8,257
7,809
7,114
4,830
812
782
682
329
278
317,218
168,388
128,484
155,874
110.382
71,197
22,109
28,395
17,880
13,424
13,351
577.30 •
270.88 •
414.27 •
94,028
25,517
14,430
8,849
5,829
5,440
3,884
4,803
4,210
2.883
1,982
642
198
382
551
2,608
1,388
1,078
12,094
11.508
9,981
7,282
1.210
1,077
848
491
432
490,183
207,019
179,191
199,584
148,734
104,305
32,915
32,184
25,819
22,024
19,714
2005-06
Ea1!mated
837.55 •
288.50 •
432.14 s
100.213
27,382
15,742
7,471
8,382
5,850
4,231
5,115
4,499
3,089
2,124
580
209
390
588
2,781
1,480
1,150
13,203
12,618
10,831
7,957
1.309
1,172
918
534
472
528,510
220,244
192,843
211,064
160,738
112,779
35,408
34,284
27,340
23,871
21,172
Page5of13
2008-07
Estimated
711.27 •
311.21 •
464.19 •
107,938
29,875
17,353
8,235
7,017
8,353
4,882
5,499
4,858
3,370
2,324
827
225
424
834
2.998
1,597
1,240
14,588
13,781
11,880
8,784
1,430
1.290
1,004
687
520
575,692
238,917
209,748
225,544
175.829
123,233
38,488
38,958
29,474
25,891
22.973
2007-0S
Estimated
773.32
330.53
473.50
114,529
31,841
18,714
8,881
7,569
8,781
6,063
5,828
6,181
3,809
2,493
887
239
464
874
3,183
1,698
1.318
15,720
14,812
12,788
9,482
1,533
1,389
1,077
832
681
815,782
251,146
224,108
237,982
188,248
132.094
41,102
39,232
31,295
27,411
24.505
H:\dept\ftn\210\STREED\Excel\Pennl usn\2002-03 recan and rates Oct 2004.xla
9/2912004
City
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
FULLERTON
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
GARDEN GROVE
Permit User Name
Flaw Rate per Millian Gallons
BOD R8fa per 1000 Pounds
SS Rate per 1000 Poundl
PC A METAL FINISHING, INC.
WINONICS, INC.
WESTERN YARN DYING
NELCO PRODUCTS, INC.
JOHNSON CONTROLS BATTERY INC.
CARGILL INC.
SUNCLIPSE, INC. (CORRUGATOR PLANT)
WEIDMANN WATER CONDITIONERS, INC.
MONOGRAM SYSTEMS
B I TECHNOLOGIES, INC.
KRYLER CORPORATION
SUNCLIPSE INC.
SCIENTIFIC SPRAY FINISHES, INC.
CARAN PRECISION ENGINEERING
SANTANA SERVICES
DR SMOOTHIE ENTERPRISES
FULLERTON PLATING
HOUSE FOODS AMERICA CORPORATION
U.S. DYEING & FINISHING INC.
PILKINGTON AEROSPACE
LINFINITY MICROELECTRONICS INC.
IDEAL UNIFORM RENTAL SERVICE
GOODWIN COMPANY
CATALINA CYLINDERS A DIV. OF APP
AIR INDUSTRIES CORP.·KNOTT
COASTLINE METAL FINISHING CORP.
ELECTRON PLATING 111 INC.
BAZZ HOUSTON CO.
CANNON EQUIPMENT WEST INC.
LACEY CUSTOM LINENS
AIR INDUSTRIES CORP. (CHAPMAN)
D & S CUSTOM PLATING INC.
CDVIDEOINC
BASIC ELECTRONICS, INC.
STAR POWDER COATING
MIRACLE STRIPPING & PLATING, INC
GRAPHIC PACKAGING CORP.
HUNTINGTON BEACH BOEING COMPANY (GENERAL FAC)
Estimated lmpacl on Permit Users to 2007-08
Baled Upon 2002-03 Actual Dllchmges
Estimated
OCSD601'
Shantaf
Property
Tax
89
69
248
283
2,174
1,107
1,032
20
1,979
1,554
1,032
25
558
15
398
660
2,381
3,241
142
838
1,858
230
131
343
437
40
508
42
201
9
2.043
5,970
2002-03
Total
Flaw
(MG)
18.3000
18.2835
8.7538
8.0274
9.0172
8.2534
1.8184
7.9213
3.4190
2.2038
3.1952
1.1283
1.8540
0.6903
0.4538
0.0418
0.2750
78.7310
208.0300
19.1830
27.3190
7.7478
1.7558
8.7488
3.9312
5.9377
5.1320
3.0858
1.2770
1.1490
0.5379
0.8982
0.6873
0.2178
0.0308
0.0220
0.9599
55.9220
2002-03
Total
BOD
(lbe)
3,700
919
11,189
5,469
1,935
7,742
13,838
213
2,881
2.590
250
3,443
1,428
1,439
34
87
85
1,019,871
380,501
6,843
1,095
14,390
27,415
6,889
8,197
1,357
489
2.928
1.953
1.218
1,388
407
440
833
108
48
1,995
94,840
2002-03
Total
SS
(lbl)
4,958
2,108
2,130
5,459
5,241
5,020
11,908
4,080
8,591
2,814
250
2,438
1,105
1,439
895
87
81
387,848
180,687
42,052
5,787
25,038
2,157
4,995
8,197
2,283
1,001
1,504
1,887
3,279
1,095
459
440
308
30
48
1,995
192,113
s
s •
388.58 s
248.55 s
238.45 s
8,109
8,725
6,778
5,817
5,054
5,428
8.874
3,941
4.025
2,079
1,300
1,853
1,228
855
389
58
142
389,484
209,580
18.643
11,721
12,402
7,978
6,092
5,441
3,070
2,247
2.218
1,408
1.608
804
542
480
381
45
30
1,325
89,944
2004-05
Proposed
577.30 s
270.88 s
414.27 s
12,485
10,510
7,810
8,373
7,901
7,785
9.811
8,313
8,312
3.058
2,018
2,593
1,799
1.384
842
83
215
472,744
289,849
30,085
18,485
18,740
9,328
7,505
7,884
4,741
3,504
3,185
2,048
2,351
1,139
819
887
479
69
44
1,921
137,487
2005-08
Estimated
837.55 •
288.50 s
432.14 •
13,801
11.544
8,454
9,052
8,572
8,390
10,188
8,868
8,723
3,282
2,217
2,768
1,943
1,477
888
89
235
502,114
311,835
32,075
20,234
19,910
9,961
8,102
8,413
5,184
3,840
3,449
2,193
2,501
1.218
888
743
512
83
47
2,050
145,978
Page6of13
2008-D7
Eslfmated
711.27 s
311.21 •
454.19 •
14,998
12,810
9,253
9,888
9,398
9,137
10,884
7,544
7,230
3,581
2,484
2,881
2,122
1.593
740
96
259
539,043
339,355
34,548
22,400
21,360
10,780
8,839
9,070
5,683
4,251
3,774
2.373
2,888
1,311
974
812
554
69
51
2,210
158,484
2007-08
Estimated
773.32
330.53
473.50
18,175
13,878
9,929
10,597
10.094
9,772
11,481
8,119
7,684
3,788
2,872
3,184
2,274
1,691
788
102
279
570,812
382,717
38,682
24,228
22,802
11,441
9,484
9,830
8,121
4,598
4,050
2,527
2,844
1.392
1,048
870
590
73
64
2,348
185,492
H:\dept\tln\210\STREED\Excel\Permll Utel'l\2002-03 racan and rates Oct 2004.xls
9/29/2004
City Permit User Name
Flaw Rate per Million Gallons
BOD Rate per 1000 Pounds
SS Rate per 1000 Poundl
HUNTINGTON BEACH JOHN A. THOMAS
HUNTINGTON BEACH COLUMBIA HUNTINGTON BEACH HOSPITAL
HUNTINGTON BEACH NUEVO ENERGY CO (HB)
HUNTINGTON BEACH CAL-AURUM INDUSTRIES INC.
HUNTINGTON BEACH BRINDLE/THOMAS Oil COMPANY
HUNTINGTON BEACH CAMBRO MANUFACTURING
HUNTINGTON BEACH PRECISION RESOURCE, CALIF DIV
HUNTINGTON BEACH SPEEDY CIRCUITS, FACILITY #2
HUNTINGTON BEACH GARG-Oil PRODUCTION LLC
HUNTINGTON BEACH TIODIZE COMPANY, INC.
HUNTINGTON BEACH CITY OF HUNTINGTON BEACH FIRE DEPARTMENT
HUNTINGTON BEACH BOEING COMPANY (GRAHAM)
HUNTINGTON BEACH CAPRO OIL COMPANY
HUNTINGTON BEACH SOUTH COAST OIL CORPORATION
HUNTINGTON BEACH HB Oil OPERATIONS TRUST
HUNTINGTON BEACH SOLDERMASK, INC.
HUNTINGTON BEACH CEMPI INDUSTRIES INC.
HUNTINGTON BEACH LOOI GRAPHICS, INC.
HUNTINGTON BEACH MILLETT INDUSTRIES
HUNTINGTON BEACH M.S. BELLOWS
HUNTINGTON BEACH ROCK INDUSTRIES, INC.
HUNTINGTON BEACH SPEEDY CIRCUITS, DIV OF PJC
HUNTINGTON BEACH PIER OIL COMPANY
HUNTINGTON BEACH PETROPRIZE
HUNTINGTON BEACH BRINDLE/THOMAS
HUNTINGTON BEACH SIGNAL ASSOCIATES
HUNTINGTON BEACH SOUTH COAST Oil COMPANY
HUNTINGTON BEACH ALEXANDER OIL COMPANY
HUNTINGTON BEACH W. M. ELLIOTT
HUNTINGTON BEACH WILVIAN JEWELL RENNER
HUNTINGTON BEACH WILLIAM J. SCOTT
HUNTINGTON BEACH O'DONNELL OIL COMPANY
HUNTINGTON BEACH S & COIL CORPORATION
IRVINE
IRVINE
IRVINE
IRVINE
IRVINE
ROYAL TY CARPET MILLS INC.
B. BRAUN MEDICAL INC.
MARUCHAN, INC.
TODDS ENTERPRISES
PACKARD-HUGHES INTERCONNECT SYSTEMS
Estimated lmpad on PermH Users to 2007-08
Based Upon 2002-03 Actual Discharges
Estimated
OCSD60%
Share of
Pn>perty
Tax
808
193
228
59
934
828
120
139
98
22
182
22
132
175
144
52
97
35
7
3
3
7
17
28
85
108
165
15,072
890
424
994
2002-03
Total
Flaw
(MG)
11.8342
10.5715
11.4379
13.0295
2.1900
3.5750
3.8088
4.7120
3.4973
3.0931
2.5012
1.1200
1.9152
1.7892
1.0490
0.3184
0.5316
0.7109
0.3409
0.1455
0.3820
0.2320
0.5550
0.2877
0.1480
0.0883
0.0029
0.0091
173.3180
237.2520
14.8254
7.7908
39.2168
2002-03
Total
BOD
(lbe)
71,025
22,042
14,800
828
19,342
7,454
5,681
4,137
488
1,084
2,335
1,137
1,140
580
308
602
1,118
347
484
19
762,704
50,889
137,987
120,788
11,819
2002-03
Total
SS
(lbs)
8,210
22,042
20,324
944
839
7,454
4,051
1,293
855
709
2,335
744
942
580
187
SIS
257
308
484
19
105,273
43,228
20,873
53,243
9,427
• s
s
2004-05
Adopted
368.58 s
248.55 •
238.45 s
23,422
14,831
12,741
5,183
5,787
4,948
3,832
3,073
1.289
1,417
1,355
1,550
708
859
847
825
489
378
418
393
301
321
205
108
54
25
0
0
0
1
0
13
0
278,068
110,353
44,819
45,589
19,591
2004-05
Proposed
577.30 s
270.88 s
414.27 s
28,514
21,200
19.029
8,082
8,785
7,189
5,489
4,375
2.019
2,189
2.028
2,248
1.108
1,033
1.222
883
891
582
807
493
442
485
320
188
84
39
0
0
0
2
0
18
0
347,410
168,694
54,380
59,249
29,891
837.55 s
288.50 s
432.14 •
30,592
22,824
20,345
8,895
7,253
7,651
5,878
4,758
2,230
2,398
2,208
2,397
1,221
1,141
1,318
939
743
814
849
627
477
498
354
183
93
44
0
0
0
2
0
19
0
373,147
184,564
58,070
82,822
32,429
Page7of13
20CMHJ7
Est!ma1ed
711.27 s
311.21 s
454.19 s
33,199
24,390
21,972
9,891
7,888
8,248
8,379
5,228
2,488
2,849
2,432
2,584
1,382
1.273
1.438
1,009
807
en
701
588
520
535
395
205
104
49
0
0
0
2
0
21
0
405,339
204,159
82,738
87,314
35,792
2007-0S
Eaflmatad
773.32
330.53
473.50
35,413
25,897
23,381
10,730
8,389
8,758
8,807
5,823
2,705
2,883
2,822
2,744
1,481
1,384
1.539
1.069
882
730
748
604
558
568
429
222
113
53
0
0
0
2
0
22
0
432.668
220,694
88,711
71,159
38,832
H:\dept\fln\210\STREED\Excel\Perml Ulera\2002-03 recon and rafes Od 2004.xla
912912004
City Permll Uler Name
Flaw Ra:ta par Miiiion Gallons
BOD Rafe per 1000 Pounds
SS Rate per 1000 Pounds
IRVINE EDWARD LIFESCIENCES LLC
IRVINE UNION INCORPORATED
IRVINE PRUDENTIAL OVERALL SUPPLY
IRVINE JEFFERSON SMURFIT CORPORATION (U.S.)
IRVINE RAYNE DEALERSHIP CORP
IRVINE ENTHONE INC.
IRVINE ELECTROLURGY INC.
IRVINE SUNSET ENVIRONMENTAL, INC. #2
IRVINE COSMOTRONIC CORP
IRVINE RICOH ELECTRONICS INC.
IRVINE PRINTRONIX, INC.
IRVINE NEWPORT CORPORATION
IRVINE 0 C B REPROGRAPHICS
IRVINE FMH INVESTOR GROUP
IRVINE NEWPORT PRECISION OPTICS
IRVINE SUNSET ENVIRONMENTAL, INC. #1
IRVINE All TEK CIRCUIT INC.
IRVINE DYE TECHNIQUE INC.
IRVINE WINTEC, LLC
LA HABRA RALPHS GROCERY COMPANY (BAKERY)
LA HABRA SHEPARD BROTHERS INC.
LA HABRA WATER MAN
LA HABRA ARNOLD ELECTRONICS, INC. 01
LA HABRA LA HABRA PLATING CO. INC.
LA PALMA LA PALMA INTERCOMMUNITY HOSPITAL
LA PALMA PERFORMANCE MACHINE INC
LOS ALAMITOS JOINT FORCES TRAINING BASE.LOS ALAMITOS
LOS ALAMITOS LOS ALAMITOS GENERAL HOSPITAL
LOS ALAMITOS TREND OFFSET PRINTING SERVICES INC.
LOS ALAMITOS ARRO\NHEAD PRODUCTS CORPORATION
LOS ALAMITOS BEARING INSPECTION INC.
NEWPORT BEACH JAZZ SEMICONDUCTOR
NEWPORT BEACH HOAG MEMORIAL HOSPITAL PRESBYTERIAN
NEWPORT BEACH HIXSON METAL FINISHING
NEWPORT BEACH RENAL RESEARCH INSTITUTE, LLC
NEWPORT BEACH AMETEK AEROSPACE
NEWPORT BEACH CITY OF NEWPORT BEACH
NEWPORT BEACH BASIN MARINE INC.
Estimated lmpad on PermH Users to 2007-08
Based Upon 2002-03 Actual Dir.charges
Eaf!mated
OCSD60%
Sham of
Property
Tax
2.810
215
2,349
211
87
184
28
118
1,184
1.303
108
370
248
28
2,715
318
9
22
15
1,095
3,871
2,882
948
43,092
41
292
18
2002-03
Tata!
Flaw
(MG)
28.0708
15.8178
8.0088
4.9828
12.3784
2.0340
9.4495
1.8145
3.1835
3.9095
1.8325
1.6987
1.5825
1.4484
0.8827
0.5850
0.9059
0.1348
0.0991
8.8379
0.3155
6.8179
4.1023
2.1230
12.3087
1.1821
25.8853
12.3191
8.8231
10.2132
0.8458
257.5577
35.9838
15.7518
2.2454
2.4275
2.2182
0.3488
2002-03
Total
BOD
(lbs)
25,842
54,008
18.683
18.334
811
23,113
1,084
8,758
8.851
3,028
3,375
3.538
3.258
1,693
1,182
1,220
284
281
188
e1,387
21.984
190
474
88
25,884
2,423
30,885
25,885
17.978
9.889
1,784
12,271
75,028
894
4,882
3,124
1,894
308
2002-03
Total
SS
(lbs)
25,842
11,848
12,821
9,489
3,378
1,787
5,108
13,883
1.718
2,981
3,375
3,538
3.258
1,487
1,233
1,220
84
281
182
17.521
932
190
733
88
25,884
2,423
33,805
25,885
17,979
9,430
1,738
12,271
75,028
2,684
4.882
3,057
1,694
251
• s
s
2004-05
Adapted
388.58 •
248.55 •
238.45 s
22,194
22,008
8,348
8,844
5,618
8,823
4,970
5,811
3,288
2,800
2,319
2,347
2,182
1,279
827
810
427
187
117
28,339
5,803
2,183
1,805
815
17,035
1,808
25,223
17,048
11,934
8,418
1,184
100,907
49,800
8,888
3,108
2,400
1,843
284
2004-05
Proposed
577.30 •
270.68 •
414.27 s
32,751
28,544
13,188
11,750
8,709
8,175
7,884
8,545
4,404
4,303
3,389
3,401
3,133
1.874
1,208
1,173
839
270
170
35,827
8,519
3,373
2,800
1,272
24,884
2,330
37,248
24,705
17,283
12,420
1,885
15.7,093
72,182
10,447
4,503
3,513
2.441
387
2005-08
E11lmlted
837.55 •
288.50 •
432.14 s
36,244
30,859
14,069
12.645
8,528
8,741
8,544
9,018
4,748
4,848
3,800
3,830
3,344
2.018
1,280
1,252
700
288
182
38,169
8,948
3,718
3,069
1,402
28.342
2,487
39,958
28,384
18,454
13,378
1,788
173,048
77,008
11,480
4.805
3,770
2,835
418
Page 8of13
2008-07
Est!mafed
711.27 •
311.21 •
454.19 s
38,323
33,298
15,187
13,538
10,527
8,458
9,378
9,808
5,177
5,068
3.888
3,913
3,805
2.191
1,393
1.350
778
311
198
41,120
7,480
4,141
3,398
1.582
28,398
2,881
43,309
28.422
19,895
14,558
1,939
182,688
83,019
12,701
5,180
4,087
2,874
458
2007-08
Estimated
773.32
330.53
473.50
40,939
35,539
18,104
14.381
11,372
10,083
10,083
10,115
5,540
5,428
4,130
4,155
3,828
2,340
1,480
1.433
839
330
209
43,838
7,852
4,487
3,678
1,896
30,153
2.847
48,180
30,178
21.124
15,559
2,059
209,041
88,150
13,747
6,501
4.357
3,077
488
H:\dept\fln\210\STREED\Excel\Pennll Usel'l\2002-03 recan and rates Ocl 2004.xls
9/2912004
City
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
ORANGE
Permit User Name
Flaw Rate per Mllllan Gallon1
BOD Rate per 1000 Pounds
SS Rate per 1000 Pounds
UCI MEDICAL CENTER
ANGELICA TEXTILE
ST. JOSEPH HOSPITAL
GRANDE TORTILLA INC.
CHILDREN'S HOSPITAL OF ORANGE COUNTY
MARCEL ELECTRONICS INT.
WASTE MANAGEMENT OF OC TRANSFER
CHAPMAN MEDICAL CENTER
CIRTECH INC.
WEST AMERICAN RUBBER COMPANY INC.
SIERRA SPRING WATER COMPANY
STATEK CORPORATION
CONTINUOUS COATING CORPORATION
SVG THERMCO SYSTEMS INC.
PLATECORP#2, INC.
ULTRA PURE METAL FINISHING, INC.
ORANGE COUNTY PLATING CO., INC.
CIRCUIT ACCESS
VILLA PARK ORCHARDS ASSOCIATION
DUCOMMUNAEROSTRUCTURES
SOUTH COAST WATER
FOAMEX LP.
CADILLAC PLATING
HIGHTOWER PLATING & MANUFACTURING CO.
HAMILTON MATERIALS
DUNHAM METAL PROCESSING
QUALITY ALUMINUM FORGE ti 2
SERRANO WATER DISTRICT
THERMAL-VAC TECHNOLOGY
QUALllY ALUMINUM FORGE
SF PP, LP.
DITTY DRUM COMPANY, INC.
CIRCUIT TECH INC.
INDEPENDENT FORGE
MA DEBURRING AND TUMBLING
PERFORMANCE PO\M>ER, INC.
BURLINGTON ENGINEERING INC.
GOMTECH ELECTRONICS
Estimated lmpad on Pennit Users to 2007-08
Based Upon 2002.Q3 Actual Discharges
Eatlmafed
OCSDSO%
Share of
Property
Tax
268
218
205
182
393
1,253
180
1,183
68
290
402
583
178
118
18
55
474
2,083
299
137
473
112
19
77
175
32
27
115
176
81
27
2002-m
Total
Flaw
(MG)
83.2390
89.9501
52.9765
3.2805
12.6885
21.8945
3.2328
7.1464
8.7337
7.0405
7.9708
4.8971
5.9100
2.7000
5.4129
4.8517
4.8133
1.0016
1.8421
2.8010
2.8283
1.6114
2.4991
2.5353
1.1900
1.8832
1.1122
0.7951
1.2226
0.9273
0.3804
0.9733
0.3781
0.3297
0.2888
0.3088
0.2827
0.1458
2002-m
Tofal
BOD
(Iba)
131,653
85,774
110,458
137,285
28,410
10,088
39,024
14,898
9,197
8.885
2,471
7,773
1,135
6,830
1,725
383
982
10, 118
3,834
4,648
211
3,030
376
117
2,481
644
1,879
28
80
477
2,042
338
845
620
648
323
293
67
2002-m
Total
SS
(Iba)
131,853
80,148
110,458
89,118
28,410
7,439
5,542
14,898
7,949
8,885
1,228
4,278
2.030
6,830
1,289
4,108
1,294
730
6,998
1,935
3,438
3,058
1,052
1.255
2,481
2.924
1,848
5.217
1,424
682
298
338
215
639
343
299
293
67
• • •
388.68 •
248.55 s
238.45 s
87,621
88,815
73,318
61,805
17,530
12.348
12.212
9,889
8,883
5.850
3,844
4,883
2.944
3,737
2,728
2,858
2,322
3,068
3,012
2.880
1,914
2.039
1,265
1.283
1,847
1,445
1,270
1.643
805
599
712
623
350
379
318
285
239
81
677.30 s
270.88 s
414.27 •
128,821
100,083
108,240
87,878
25,402
18,448
14,725
14,330
9,870
8,843
5,778
8,588
4.660
6,415
4,118
4,801
3,675
3,820
4,632
3,707
3,113
2,959
1,980
2.015
2,388
2,319
1,833
2,827
1,312
908
884
793
481
655
444
390
352
123
837.55 •
288.60 •
432.14 s
135,337
108,088
113,374
71,554
27,107
20,078
15,714
16,292
10,381
9,308
8,325
7,088
4,973
5,778
4,497
4,873
3,905
3,873
4,816
3,997
3,348
3,158
2,158
2,192
2,547
2,481
1,983
2,789
1,412
980
948
884
619
693
478
418
378
134
Page9of13
~7
Estimated
711.27 $
311.21 •
454.19 s
145,801
117,991
122.224
78,438
29,223
22,085
18,981
18,485
11,282
10,124
8,995
7,703
5,479
8.229
4,983
5,430
4,311
4,193
6,188
4,357
3,838
3,408
2.372
2.410
2,745
2,880
2,124
2,943
1,635
1,072
1,027
951
588
841
616
458
411
147
2007-08
Estimated
773.32
330.53
473.60
154,918
128,392
129,778
80,828
31,029
23,781
18,022
17,604
12.011
10,819
7,581
8,227
6,907
6,814
5,357
5,817
4,853
4,485
5,488
4,882
3,884
3,817
2.655
2.693
2.815
2,851
2.281
3,094
1,839
1,150
1,095
1,024
808
882
550
487
438
168
H:\depMn\210\STREED\Exml\Permll Users\2002-m racon and nl1es Oct 2004.xla
9/2912004
CHy
ORANGE
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
PLACENTIA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
Pennlt User Name
Flaw Rate per Mllllon Gallons
BOD Rafa per 1000 Pounds
SS Rate per 1000 Pounds
DATA AIRE INC. #2
KNOTT'SBERRYFARMFOODS
PLACENTIA LINDA COMMUNITY HOSPITAL
FROZSUN FOODS, INC.
s.e. THOMAS INC.
CALIF CONSOLIDATED WATER PURIFICATION
EXCELLO CIRCUITS MANUFACTURING CORP.
CARTEL ELECTRONICS
HARTWELL CORPORATION
KC A ELECTRONICS, INC.
NOLLAC OIL COMPANY
GEORGE A. JONES, IMPERIAL #2 WELL
BRIGHT ARMOUR PLATING
SUPERIOR PROCESSING
STREMICKS HERITAGE FOODS LLC
CHROMA SYSTEMS PARTNERS
IR\4\/D DATS
UWMC HOSPITAL CORPORATION
El METATE FOODS, INC.
GOGLANIAN BAKERIES
EL TORO MEAT SHOP
GEMINI INDUSTRIES INC.
MICRO SEMI CORP.
DANONE WATERS OF N. A. ·SANTA ANA
ORANGE COUNTY REGISTER
ITT CANNON, A DIVISION OF ITT INDUSTRIES
TTM TECHNOLOGIES #1
CULLIGAN WATER CONDITIONING
MEDTRONIC HEART VALVES, INC.
INTERNATIONAL FOOD SOLUTIONS, INC
UNIVERSAL CIRCUITS INCORPORATED
ASTECH ENGINEERED PRODUCTS
EMBEE INC. #2
BURROWS IND. DBA MINUTEMAN PUMPING
PIONEER CIRCUITS
ALPHANETICS INC.
MARKLAND MANUFACTURING, INC.
TTM TECHNOLOGIES, INC
Estimated Impact on Permit Users to 2007-08
Based Upon 2002-03 Actual Dlschargel
Estimated
OCSD80%
Shareot'
Pruperty
Tax
923
2.041
2.855
183
742
248
153
486
619
12
29
78
128
3,836
1,252
8,038
317
790
128
97
1,892
8.684
14,959
182
627
712
847
118
25
177
316
102
487
842
2002-Q3
Total
Flow
(MG)
0.4202
18.6558
13.3404
7.4577
1.7687
3.8178
5.4805
3.8029
1.3811
1.8194
1.9307
1.5483
1.3014
0.5574
88.9928
187.2883
207.7078
37.7209
3.8308
8.0730
4.1584
5.8713
30.4213
35.5825
18.1072
31.0324
17.7899
18.4408
7.1975
2.8088
14.0830
13.9890
13.4831
2.7788
9.7955
9.3168
9.0452
8.8748
2002-03
Tcdal
BOD
(lbs)
858
871,488
27.815
28,384
19,044
383
3,083
3,095
2,422
1,491
259
314
185
132
2.109,695
288,230
5,236
78,848
101,844
71,184
88,921
853
18,854
4,219
35,2.80
16,173
21,094
368
18,359
31,450
2,053
2,449
2,398
24,011
8,549
4,891
3,370
8,207
2002-03
Total
SS
(lbe)
734
53,200
27,815
8,818
4,113
12,879
1,254
888
1,992
887
772
314
287
111
743,727
43,329
1,770
78,848
51.273
83,188
24,979
133,608
11,731
8,009
32,482
13,852
11,125
8,248
10,187
4,153
4.802
2,124
3,600
4,813
4,053
1,877
2,977
8,337
s
s
s
368.58 s
248.55 s
238.45 s
543
235,398
18,483
11,382
8,388
4,588
3,085
2,309
1,679
1.248
960
723
589
265
734,607
138,852
78,280
52,205
38,901
35,725
29,093
34.181
18,189
18,073
22,451
18,512
14.453
7,841
9,143
9,842
8,839
8,271
8,424
8,092
8,204
6,049
4,881
5,588
2004-05
Praposed
677.30 s
270.88 s
414.27 s
778
287,491
28,753
14,730
7,880
7,837
4,518
3,285
2.288
1.813
1,505
1.108
915
404
930,531
187,117
122.060
75,848
50.965
50,091
38,278
58,855
28,984
25,001
32,305
27,780
20,588
12,179
12,785
11,855
10,884
9,819
9,924
10,014
9,108
7,397
7,3S7
8,274
2005-08
Estimated
837.55 s
288.60 s
432.14 •
832
284,989
28,550
15,803
8,399
8,104
4,925
3,573
2,427
USS
1,839
1,212
1,002
441
988,778
202,749
134.899
80,728
53,923
52,974
38,521
81.599
28,327
27,384
34,484
30,148
22,235
13,288
13,702
12.859
11,833
10,543
10,843
10.692
9,888
8,075
8,028
8,912
Page 10of13
200IH>7
Estlma1ed
711.27 s
311.21 s
454.19 s
899
307,154
30,778
17,144
9,053
8,878
5,427
3,928
2,828
2,152
1,805
1,340
1,108
488
1,057,849
222,127
160,169
87,027
57,845
68,578
41,353
84,883
32.211
30,259
37,169
33,088
24,271
14,848
14,828
13,871
12.823
11,877
11,971
11,644
10,848
8,910
8,835
9.699
2007-0S
Esfrmated
773.32
330.53
473.50
956
328,048
32,680
18,283
9,810
9,170
5,851
4,229
2,798
2,310
1,944
1,448
1,197
627
1,118,292
238,625
183,193
92,408
80,838
59,874
43,772
87,931
34,851
32,703
39,497
35,572
25,897
16,794
15,787
14,534
13,828
12,833
12,923
12,289
11.658
9,815
9,618
10,368
H:\depMn\210\STREED\Excel\Permlt Userm\2002-03 recon and rates Oct 2004.xls
912912004
Cfty
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
Permit User Name
Flaw Rafa per Miiiion Gallons
BOD Rate per 1000 Pounds
SS Rale per 1000 Pounds
FABRICATION CONCEPTS CORPORATION
EMBEE INC. #1
TEXTRON AEROSPACE
ANOMIL ENT. OBA DANCO METAL SURFACING
ANODYNE INC.
EMBEE INC. #3
ALUMINUM FORGE· DIV. OF ALUM. PRECISION
WEBER PRECISION GRAPHICS
CHROME TECHNOLOGY, INC.
SOUTH COAST CIRCUITS 113
RICOH ELECTRONICS #2
ALUMINUM PRECISION PRODUCTS INC. CENTRAL
DATA ELECTRONIC SERVICES INC.
ACTIVE PLATING INC.
INTEGRATED AEROSPACE, INC.
GALLADE CHEMICAL INC.
ACCURATE CIRCUIT ENGINEERING
ALUMINUM PRECISION PRODUCTS INC.-SUSAN
VERTEQ PROCESS SYSTEMS INC.
REID METAL FINISHING
RB C TRANSPORT DYNAMICS CORP.
SOUTH COAST CIRCUITS tl4
ELECTROSERVICES 2000 INC.
ALMATRON ELECTRONICS, INC.
BRASSTECH. INC
SOUTH COAST CIRCUITS #2
PLEION CORPORATION #2
L & N UNIFORM SUPPLY COMPANY,INC.(CLEAN)
\NHEEL SERVICES GROUP, INC
SOUTH COAST CIRCUITS, INC.
PACIFIC QUARTZ, INC.
SOUTH BAY CHROME SALES/CHROME EFFECTS
ORANGE CONTAINER, INC.
MASK TECHNOLOGY INC.
SELECT CIRCUITS
S PS TECHNOLOGIES
E FT FAST QUALITY SERVICE, INC.
SANTA ANA PLATING (CNK CAPITAL)
Estimated lmpad on PermH Users to 2007-08
Based Upon 2002.Q3 Aclual Discharges
Eaffmated
OCSD60%
Shantaf
Pro petty
Tax
778
30
4,539
150
24
30
184
182
217
83
795
75
178
83
124
134
298
72
174
107
798
79
88
128
128
278
2,854
88
44
2002-03
Total
Flaw
(MG)
6.5891
7.0848
7.0782
5.4452
5.8840
8.0751
2.2288
1.0217
3.8819
3.5930
1.7501
1.5788
3.1141
3.2738
1.5510
1.8848
1.3752
1.7843
2.1927
1.9402
1.0328
2.2302
2.1012
1.7311
0.9141
1.2738
1.0439
0.7479
1.5819
1.5479
0.8489
1.4043
0.8319
0.9918
0.7883
3.9208
0.9880
0.3985
2002-03
Total
BOD
(Iba)
5,855
828
5.873
2,879
845
1,812
2.011
9,209
1,278
2,084
4,412
5,120
1,832
1,183
3,274
2.303
4,283
2,144
1,271
939
2,122
431
841
1,048
1,908
2,019
1,319
1,753
219
459
1,400
475
1,338
811
1,280
3,404
122
827
2002-03
Talat
SS
(Iba)
8,054
1,698
6,583
3,417
4,441
1,327
10,307
1,161
2,027
1,369
4,085
1.956
1,021
798
3,108
1,880
1,027
2,116
1,271
910
2,142
255
73
854
1,908
297
1,449
1,781
773
483
1.389
700
1,799
397
190
3,404
357
827
• • •
388.58 •
248.55 •
238.45 •
5,379
3,184
5,400
3,488
3,307
2.958
3,779
2,940
2,231
2,169
2,718
2,320
1,797
1.888
2,127
1.752
1,818
1,895
1,427
1,188
1,419
990
851
1,054
1,285
1,042
1,058
1,138
822
802
992
803
994
812
849
3,103
471
549
20CJ4.0S
Proposed
577.30 s
270.88 •
414.27 •
8,082
4,851
7,989
6,284
5,284
4,493
6,101
3,580
3,428
3,205
3,897
3.108
2,883
2,635
3,069
2.648
2,379
2,487
2,138
1,752
2,058
1.610
1,417
1,554
1,833
1,405
1,580
1,844
1,293
1,222
1,445
_1,229
1,472
902
875
4,595
738
795
20CJ5..a&
Elflmaled
837.55 •
288.50 •
432.14 •
8,883
5,418
8,820
5,721
6,718
4.912
8,455
3,808
3,719
3,483
4,154
3,327
2,888
2,787
3,278
2,742
2,558
2,870
2.314
1,901
2,198
1,857
1,558
1,888
1,956
1,623
1,872
1,762
1,408
1,333
1,648
1,336
1,588
980
948
4,853
805
849
Page 11of13
2008-07
Estimated
711.27 •
311.21 •
454.19 $
9.379
5,991
9,398
8,259
8,248
5,425
8,893
4,118
4,079
3,828
4.473
3,603
3,187
3.052
3,634
2,882
2,778
2,897
2,532
2,088
2,388
1.838
1,727
1,854
2,109
1,889
1.811
1.888
1,544
1.488
1,871
1,485
1.883
1,078
1,039
6,394
887
915
2007-08
Estimated
773.32
330.53
473.50
9,889
8,474
10,058
8,714
8,698
5.859
7,269
4,379
4,384
4,115
4,748
3,837
3,431
3,293
3.753
3,188
2,985
3,090
2,717
2,242
2,614
1,988
1,871
1,995
2,239
1,793
1,929
2.001
1,882
1,682
1,778
1,675
1,782
1,157
1,118
5,769
958
971
H:\dept\fln\210\STREEO\Excel\Permlt Usera\2002.Q3 recan and ra1es Od 2004.xla
9/2912004
City
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SANTAANA
SEAL BEACH
SEAL BEACH
STANTON
STANTON
TUSTIN
TUSTIN
TUSTIN
TUSTIN
TUSTIN
TUSTIN
TUSTIN
TUSTIN
WESTMINSTER
WESTMINSTER
WESTMINSTER
YORBA LINDA
YORBA LINDA
Penni! User Name
Flaw Rate per Miiiion Gallol\I
BOD Rate per 1000 Pounds
SS Rate per 1000 Pounds
CAL-TRONICS CIRCUIT INC. -SANTA ANA
LAM-PLATE TECH INC.
OLYMPIC POWDER COATINGS INC.
GORILLAS POLISHING AND PLATING
MARGARETIS TEXTILE SERVICE
MARK OPTICS INC.
BA F INDUSTRIES
PRECIOUS METALS PLATING
STRIP CLEAN COMPANY
PRECISION CIRCUITS WEST INC.
AQUA-CON COMPANY
ALLOY TECH ELECTROPOLISHING INC.
MEDEVA PHARMACEUTICALS CA, INC.
VICTORY CIRCUITS INC.
X Z X ELECTRONICS
AUTO-CHLOR SYSTEM OF WASHINGTON, INC.
A&K DEBURRING AND TUMBLING
DATA SOLDER INC
HI-TECH STENCILS
LAM LIGHTING INC.
PRECISION POWDERCOATING INC.
NAVAL WEAPONS STN SEAL BCH CD 043
ACCURATE METAL FABRICATORS
ALL METALS PROCESSING OF O.C. INC.
PURE-CHEM PRODUCTS COMPANY INC.
CITY OF TUSTIN WATER SERVICE (17TH ST.)
CITY OF TUSTIN, WATER SERVICE (MAIN ST.)
TUSTIN HOSPITAL AND MEDICAL CENTER
CITY OF TUSTIN -MAINTENANCE YARD
TOYOTA RACING DEVELOPMENT t2
CHEEK ENGINEERING & STAMPING
WESCO SERVICES
REVERE TRANSDUCERS, INC.
VENCOR INC OBA VENCOR HOSP-ORANGE COUNTY
LINDBERG HEAT TREATING CO.-ALUMATHERM
SOUTHERN CALIFORNIA EDISON
AERA ENERGY LLC
METRO WATER DISTRICT OF SO CA
Estimated Impact on Permtt Users to 2007-0S
Based Upon 2002-m Actual Dllcharps
Estimated
OCSD80%
Share of
Property
Tax
118
108
160
233
88
231
93
14
60
152
131
97
82
2,040
138
290
70
242
244
1.184
1,284
708
284
2002-m
Total
Flaw
(MG)
0.8315
0.7248
0.5203
0.6832
0.3822
0.4100
0.4151
0.6052
0.6097
0.4882
0.6081
0.4538
0.1921
0.1475
0.1624
0.0545
0.1008
0.0848
0.0272
0.8880
0.1693
5.2734
2.5550
2.9329
0.1891
98.3091
19.2910
6.9827
0.4317
0.4088
0.3871
0.0722
1.2217
6.8993
4.0551
1.3820
440.4840
2.0152
2002-m
Total
BOD
(lbl)
548
327
557
388
765
395
840
243
184
388
149
232
401
651
324
483
235
135
53
1,339
143
10,995
5,327
2,273
317
19
882
12,432
885
798
442
293
1,202
12.300
1,408
2,114
82,594
3,995
2002-m
Total
SS
(lbl)
272
129
518
192
765
88D
472
204
240
303
203
148
401
6S
88
121
189
135
&1
1,394
84
10,995
5,327
2,239
380
2,428
1,488
12,432
873
741
281
43
1,152
12,300
1,408
2,099
29,538
4,000
• • •
388.68 •
248.65 •
238.45 •
433
379
453
389
601
459
425
332
328
348
310
280
288
204
168
169
141
90
35
911
114
7,288
3,538
2.180
234
38,081
7,825
8,252
682
&28
307
110
1,024
8,184
2,180
1,528
184,954
2,690
577.30 •
270.88 •
414.27 •
825
&80
ass
674
728
708
608
SOD
601
512
478
385
385
257
212
212
200
130
&1
1,324
188
10,675
&.124
3,238
344
68.810
11,923
11,958
845
759
439
139
1,508
11,831
3,305
2.228
283,470
3,902
837.65 s
288.50 •
432.14 •
878
812
71&
825
775
768
853
544
&45
654
618
419
411
277
228
228
214
139
65
1,413
179
11,288
5,488
3,493
388
82,467
13,124
12,781
902
811
474
149
1,824
12,825
3,600
2,388
311,853
4,188
Page 12of13
2008-o7
Estimated
711.27 •
311.21 •
454.19 •
743
878
778
688
838
814
709
599
800
805
571
481
443
301
249
244
231
160
59
1,524
198
12,188
6,895
3,810
397
69,811
14.693
13,767
973
878
617
182
1,788
13,810
3,882
2,580
348,198
4,493
2007-08
Estimated
773.32
330.53
473.60
798
730
831
741
887
884
768
845
848
849
818
497
471
322
288
259
245
159
83
1,818
210
12.918
8,259
4,080
422
75,834
16,831
14,807
1,033
931
&53
173
1,888
14,462
4,288
2,748
376,310
4,773
H:\depMn\210\STREED\Excel\Pennll Uaers\2002-03 recan and m1ea OCI 2004.xll
9/2912004 Page 13of13
Estimated lmpad on Permit Users to 2007-08
Bared Upon 2002-03 Actual Discharges
Eaflmated
OCSD60% 2002-03 2002-03 2002-03
Clly PermH User Name Share of Total Total Total 2004-05 2004-05 2005-06 2CJOS.07 2007-00
Property Flaw BOD SS Adopted Proposed Estimated Estimated Estfma1ed
Tax (MG) (lbs) (lbe)
Flaw Rate per Million Gallons s 368.68 s 577.30 • 837.55 s 711.27 s 773.32
BOD Rate per 1000 Pounds • 248.55 s 270.68 s 288.60 • 311.21 • 330.53
SS Rate per 1000 Pounds s 238.45 s 414.27 s 432.14 s 454.19 • 473.60
YORBA LINDA PLEGEL OIL COMPANV (BLATINER • A.H.A.) 168 1.9693 115 131 788 1.222 1,345 1,498 1,823
YORBA LINDA COLUMBINE ASSOCIATES 12 0.1483 so 5 68 101 111 123 133
YORBA LINDA SHERWIN D. YOELIN 8 0.1610 25 12 85 99 109 121 131
Total for PennH Userw 904,415 8,117.8307 17,914,101 7,478,311 8,480,883 11,478,853 12,300,319 13,323,051 14,193,189
H:\dept\fln\210\STREED\Excel\Permll Uurw\2002-03 recon and rates Oct 2004.xla
9/29/2004
Permit User Rate Calculation Model
October 2004 Proposed 2004-05
A. I ~ g § E G J:i
Ref Descri2tlon CollO&M CollCIP JolntO&M JointCIP CO Pa Egul!xAdj SFI Total
1 Budget Requirements: 22,605,790 62,058,000 88,814,140 189, 165,800 41,917,000 2,638,000 1,876,000 388,874,530
2 Remove lnterfund budgets (2,838,000) (1,876,000) (4,514,000)
3 Remove Fluctuating CIP With Capacity (62,058,000) (169, 165,600) (231,223,600)
4 Add Avg "Cash-funded" CIP W/o Capacity 9,877,061 32,550,843 42,427,904
5 Requirements for Rate Setting 22,605,790 9,877,081 88,814,140 32,550,843 41,917,000 0 0 193,584,834
e Reduce for Interest Income {4.677,628} (12,750,874} (3, 159,498} {20,588,000}
7 Net Requirements for Smooth Rate Setting 22,605,790 5,199,433 86,614,140 19,799,969 38,757,502 0 0 172,976,834
No Capacity No Capacity No Capacity
8 Allocation Parameters: 04·05 Budget Validated CIP 03-04 Actual Validated CIP ComboVCIP
9 Flaw 50% 90% 12% 35% 50%
10 BOD 10% 34% 33% 27%
11 SS 50% 54% 32% 23%
Resultant
Weighted
12 Allocation to Parameters: CollO&M CollCIP JointO&M JolntCIP COPS Total Averall!%
13 Flaw 11,298,561 4,879,490 10,393,697 6,929,989 19,378,751 52,678,488 30%
14 BOD 0 519,943 29,448,808 6,533,990 10,484,528 48,987,266 27%
15 SS 11,3091229 0 48,771,838 8,335,990 8,914,225 73,331,080 42%
16 22,805,790 5,199,433 88,814,140 19,799,989 38,757,502 172,976,834 100%
17 Parameter Rates: CollO&M CollCIP JolntO&M JolntCIP COP&
Proposed
Rates Would Raise
18 Flaw@ 250 mgd, per MG 123.80 51.28 113.90 75.95 212.37 577.30 52,678,488
19 BOD@ 228 mgll, per 1000 lb 0.00 3.00 169.72 37.88 60.31 270.68 48,987,288
20 SS @ 232.6 mg/L, per 1000 lb 63.89 0.00 264.23 35.79 50.36 414.27 73,331,080
21 172,978,834
H:\dept\ftn\210\STREED\Excei\ald d capy\STRATPLN\Pennll user model 10-2004.xls-Od 2004 Proposal
9/2912004
Permit User Rate Calculation Model
Estimated 2005-08
A. I G g g E ~ 1:1
Ref Descr12tfon CollO&M CollCIP JolntO&M JolntCIP CO Pa Egul~Adj SFI Total
1 Estimated Budget Requirements: 23,420,000 62,058,000 89,740,000 189, 165,600 48,586,000 2,638,000 1,876,000 397,483,600
2 Remove lnterfund budgets (2,638,000) (1,876,000) (4,514,000)
3 Remove Fluctuating CIP With Capacity (62,058,000) (189, 165,600) (231,223,600)
4 Add Avg •cash-funded" CIP W/o Capacity 9,877,081 32,550,843 42,427,904
8 Requfrements for Rate Setting 23,420,000 9,8n,081 89,740,000 32,550,843 48,588,000 0 0 204, 173,904
7 Reduce for Interest Income ,1, 709.230) (5,832,939} (8.407,831} '15, 750,000}
9 Net Requirements for Rate Setting 23,420,000 8,187,831 89,740,000 28,917,904 40,178,189 0 0 188,423,904
10 Allocallon parameters: 04-05 Budget Valfdated CIP 03-04 Actual Valfdated CIP ComboVCIP
11 Flaw 50% 90% 12% 35% 50%
12 BOD 10% 34% 33% 27%
13 SS 50% 54% 32% 23%
Resultant
Weighted
14 Allocatfon to parameters: CollO&M CollCIP JolntO&M JolntCIP CO Pa Total Average%
15 Flaw 11,710,000 7,351,048 10,788,800 9,421,288 20,089,085 59,340,199 31%
18 BOD 0 816,783 30,511,600 8,882,908 10,848,108 51,059,397 27%
17 SS 11,710,000 0 48,459,800 8,813,729 9,240,979 78,024,308 41%
18 23,420,000 8,167,831 89,740,000 28,917,904 40,178,189 188,423,904 100%
19 Parameter Rates:
Proposed
Rates Would Raise
20 Flow@ 255 mgd, per MG 125.81 78.98 115.70 101.22 215.84 637.55 59,340,199
21 BOD @ 228 mg/l, per 1000 lb 0.00 4.82 172.40 50.19 81.29 288.50 51,059,397
22 SS @ 232.6 mg/L, per 1000 lb 84.86 0.00 268.39 47.71 51.18 432.14 78,024,308
23 188,423,904
H:\dept\fln\210\STREED\Excel\old d copy\STRATPLN\Permll user model 10-2004.xl•net 05.m
912912004
Permit User Rate Calculation Model
Estimated 2006-07
A I k Q § f ~ ti
Ref Descrl~tlon CollO&M CollCIP JolntO&M JolntCIP CO Pa Egul!!AdJ SFI Total
1 Estimated Budget Requirements: 24,256,000 62,058,000 92,988,000 169, 185,600 82,278,000 2,638,000 1,876,000 415,259,600
2 Remove lnterfund budgets (2,838,000) (1,876,000) (4.514,000)
3 Remove Fluctuating CIP With Capacity (62,058,000) (169, 165,600) (231,223,600)
4 Add Avg "Cash-funded• CIP W/o Capacity 9,877,061 32,550,843 42,427,904
e Requirements for Rate Setting 24,258,000 9,8n,081 92,988,000 32,550,843 82,278,000 0 0 221,949,904
7 Reduce for Interest Income ,1,384.597} {4,563,079} (8. 730,324} {14,678,000}
9 Net Requirements for Rate Setting 24,256,000 8,492,484 92,988,000 27,987,764 53,547,878 0 0 207,271,904
10 Allocation parameters: 04-05 Budget Validated CIP 03-04 Actual Validated CIP ComboVCIP
11 Flow 50% 90% 12% 35% 50%
12 BOD 10% 34% 33% 27%
13 SS 50% 54% 32% 23%
Resultant
Weighted
14 Allocation to parameters: CollO&M CollCIP JolntO&M JolntCIP COP& Total Ave!!Se%
15 Flow 12.128,000 7,643,217 11,158,580 9,795,718 28,773,838 87,499,333 33%
16 BOD 0 849,248 31,815,920 9,235,962 14,457,872 58,159,001 27%
17 SS 12,128,000 0 50,213,520 8,958,085 12,315,985 83,613,570 40%
18 24,256,000 8,492,484 92,988,000 27,987,764 53,547,876 207,271,904 100%
19 Parameter Rates: Proposed
Rates Would Raise
20 Flow@ 260 mgd, per MG 127.80 80.54 117.58 103.22 282.13 711.27 87,499,333
21 BOD@ 228 mg/L, per 1000 lb 0.00 4.71 175.20 51.18 80.12 311.21 56,159,001
22 SS @ 232.6 mg/L, per 1000 lb 85.88 0.00 272.78 48.85 68.90 454.19 83,613,570
23 2071271,904
H:\dept\ftn\210\STREED\Excel\ald d caJ¥STRATPLN\Permlt user model 10-2004.xls-net 06-07
9/2912004
Permit User Rate Calculation Model
Estimated 2007-08
A. g ~ g § E ~ 1:1
Ref Descrl2tlon CollO&M CollCIP JolntO&M JolntCIP CO Pa Egui~Adj SFI Total
1 Estimated Budget Requirements: 25,138,000 62,058,000 98,337,000 189, 165,600 75,898,000 2,638,000 1,876,000 433, 110,800
2 Remove lnterfund budgets (2,838,000) (1,876,000) (4,514,000)
3 Remove Fluctuating CIP With Capacity (62,058,000) (169, 165,600) (231,223,600)
4 Add Avg "Cssh-fundecf' CIP W/o Capacity 9,877,081 32,550,843 42,427,904
6 Requirements for Rate Setting 25,138,000 9,877,081 96,337,000 32,550,843 75,898,000 0 0 239,800,904
7 Reduce for Interest Income (1,282.485) (4,226,557} (9.854,958} {15,364,000}
9 Net Requirements for Rate Setting 25,138,000 8,594,576 96,337,000 28,324,288 66,043,042 0 0 224,438,904
10 Allocation parameters: 04-05 Budaet Valfdated CIP 03-04 Actual Validated CIP ComboVCIP
11 Flaw 50% 90% 12% 35% 50%
12 BOD 10% 34% 33% 27%
13 SS 50% 54% 32% 23%
Resultant
Weighted
14 Allocation to parameters: CollO&M CollCIP JolntO&M JolntCIP COP& Total Averaae%
15 Flaw 12,589,000 7,735,119 11,580,440 9,913,500 33,021,521 74,799,580 33%
16 BOD 0 859,458 32,754,580 9,347,014 17,831,821 60,792,873 27%
17 SS 12,589,000 0 52,021,980 9,083,772 15,189,900 88,844,651 40%
18 25,138,000 8,594,578 96,337,000 28,324,286 66,043,042 224.438,904 100%
19 Parameter Rates:
Proposed
Rates Would Raise
20 Flow@ 265 mgd, per MG 129.95 79.97 119.52 102.49 341.40 n3.32 74,799,580
21 BOD@ 228 mg/L, per 1000 lb 0.00 4.87 178.09 50.82 98.95 330.53 60,792,673
22 SS@ 232.6 mg/L, per 1000 lb 88.99 0.00 277.25 48.31 80.95 473.50 88,844,651
23 224,438,904
H:\dept\fln\210\STREED\Excel\old d capy\STRATPLN\Pennll user model 10-2004.xll-nel 07-0S
9/29/2004
Average "Cash-Funded" Validated Capital Improvement Program
Determination of Amount to Include In Permit User Rates
Total Refurbishment
Validated Additional Replacement
Total Plant and Collection System CIP Capacity Rehabilitation
Validated Capital Improvement Program 2,504,683, 155 861,842,508 1,642,820,849
Additional Capacity Projects 881,842,508 881,842,508 0
Total Refurbishment. Replacement and Rehabilitation 1,842,820,849 0 1,842,820,849
Funded by COPs (1,405,000,000/2,504,683,155) = 58% 921,548,279 0 921,548,279
Funded by Fees and Revenues 44% 721,274,370 0 721,274,370
Total Refurbishment. Replacement and Rehabilitation 1,842,820,849 0 1,842,820,849
Treatment, Disl>OS81 & Reclamation Plant
Validated Capital Improvement Program 1,930,018,000 889,839,990 1,280,378,010
Additional Capacity Projects 889,639,990 669,639,990 0
Total Refurbishment, Replacement and Rehabilitation 1,280,378,010 0 1.260,378,010
Funded by COPs (1.405,000,000 / 2,504,683 1 155) = 58% 707,013,876 0 707,013.876
Funded by Fees and Revenues 44% 553,384,334 0 553,384,334
Total Refurbishment, Replacement and Rehabilitation 1,280,378,010 0 1,280,378,010
Collection System
Validated Capital Improvement Program 574,845, 155 192,202,518 382,442.839
Additional Capacity Projects 192,202,518 192,202,518 0
Total Refurbishment, Replacement and Rehabflltatlon 382,442,839 0 382,442,839
Funded by COPS (1.405.000,000 / 2,504,883, 155) = 58% 214,532,804 0 214,532,804
Funded by Fees and Revenues 44% 187,910,035 0 187,910.035
Total Refurbishment, Replacement and Rehabilitation 382,442,839 0 382,442,639
H:\dept\fin\210\STREEO\Excel\o!d d copy\STRATPLN\VCIP by flow, bod, u 2003 FAHR.xls
17 Yr Average
Cash Funded
CIP
42,427,904
32,550,843
9,877,081
VCIP Allocation
9/29/2004
Allocation of JO Costs to Flow, BOD and SS
2003-04 Actual Costs
RAC Allocation Percentages Allocated Costs Percent
Flow BOD SS Flow BOD SS Total of Total
Preliminary Treatment 4,928,287 75% 5% 20% 3,894,715 248,314 985,257 4,928,287 8%
Primary Treatment 7,858,330 15% 25% 80% 1,178,450 1,984,083 4,713,798 7,858,330 10%
Secondary Treatment 5,364,031 100% 5,384,031 5,364,031 7%
Cryogenic Plant 580,117 100% 580,117 580, 117 1%
Effluent Disposal 812,104 100% 812,104 812,104 1%
Solids Handling 28,398,473 20% 80% 5,879,895 22,718,778 28,398,473 35%
Subtotal 5,885,289 13,834,239 28,417,834 47,937,342 59%
Cogeneration 8,358,287 13% 40% 47% 1,088,577 3,343,315 3,928,395 8,358,287 10%
Utilities 9,843,305 13% 40% 47% 1,253,830 3,857,322 4,532,353 9,843,305 12%
Electrical Distribution 1,118,848 13% 40% 47% 145,450 447,539 525,859 1,118,848 1%
Miscellaneous Bldgs 4,770,850 13% 40% 47% 820,185 1,908,280 2,242,208 4,770,850 8%
Air Quality 1,597,905 13% 40% 47% 207,728 839,182 751.015 1,597,905 2%
Laboratory 7,155,874 13% 40% 47% 930,238 2,882,270 3,383,187 7,155,874 9%
Total 80,582,011 9,929,078 28,892,107 43,780,828 80,582,011 100%
Calcuated Actual Ratios for 2003-04
Direct Charges (Subtotal) 12% 29% 59% 1000,{,
Total Charges 12% 34% 54% 100%1
H:\dept\fln\210\STREED\Excel\Pennlt Usens\Pennft User JO Allocation 2003-04.xla
912912004 Validated Capital Improvement Program Page 1of5
Allocatlon to Flaw, BOD and SS Less Cspacity Projects
A B c D E F G H
NNCapaclly Total Allac:af.ad Total Allac:af8d Total Allocatad Total Alloc:8fad
Pnt~ Tiii• Flow BOD TSS Total lhru 2020 Percentage of Nan Capacily CIP Nan Capacity CIP Nan C8pacily CIP Nan Capaclly CIP
Cost Flaw BOD SS Total Alloc:Bted
1-17 Santa Ana Trunk Sewer Rehab. 90% 10% 14,838,000 13.174,200 1,483,800 0 14,638,000
1-22 Lawer Maln-BroacM8y MH Rehabllltatlan 90% 10% 1,487,0QO 1,320,300 148,700 0 1,487,000
1-98 Continuous Feed Chemical Tiutment Facility 90% 10% 451,000 4()5,900 45,100 0 451,000
1-98 Trunk Sewer Mappfng Pro)ecl 90% 10% 2,013,000 1,811,700 201,300 0 2,013,000
1-100 Greenville Sullivan /Raltl Slreel Manhole Rehab. 90% 10% 3,289,000 2,942,100 328,900 0 3,289,000
2-24-1 Carbon Cnyn Sewer and Pump Stn. Abandonment 90% 10% 3,487,000 5()0,(, 1,580,150 173,350 0 1,733,500
2-31 Santa Ana River Interceptor Rellef Sewer 90% 10% 17,272,000 75% 3,888,200 431,800 0 4,318,000
2-41 Sanla Ana RMlr lnfen:epfor Reallgnmenl and Prut. 90% 10% 63,820,000 57,258,000 8,382,000 0 63,820,000
2-41-1 Abandonment of Iha ex<lng SARI In SA River 90% 10% 8,458,000 7,810,400 845,800 0 8,458,000
2-42 Aband. of Yorba Linda Pump Stallan 90% 10% 955,000 859,500 95,600 0 955,000
2-49 Taft Bnmc:h lmpravemenls 90% 10% 3,508,000 5()0,(, 1,578,800 175,400 0 1,754,000
2-50 Atwaod Subtrunk lmpravemenfs 90% 10% 3,187,000 50% 1,434,150 159,350 0 1,593,500
2-51 Lower Sanla Ana RMlr lnlen:eptor lmpruvemeftla 90% 10% 35,012,000 75% 7,877,700 875,300 0 8,753,000
2-52 Euclid Relief lmprovemeftla -Reach •A• 90% 10% 20,858,000 50% 9,385,200 1,042,800 0 10,428,000
2-53 Euclld Relief lmpruvemenfa -Reach "B" 90% 10% 10,298,155 75% 2,317,085 257,454 0 2,574,539
2-58 San!a Ana River Relief Sewer, Reach 8 90% 10% 32,702,000 100% 0 0 0 0
2-65 Newhope-Placenlla & Cypnu Trunk Replacemenls 90% 10% 28,785,000 75% 8,478,825 719,625 0 7,196,250
2-68 Upper & lower Newhope-Placenfla MH Rehabllltatlan 90% 10% 4,351,000 3,915,900 435,100 0 4,351,000
2-87 SARI and South Anaheim lntan:eptor MH Rehab. 90% 10% 3,087,000 2,778,300 308,700 0 3,087,000
2-88 RehllbHllata Dlsfrfct Siphons By AddJng AJ.r Jumper 90% 10% 5,731,000 5,157.900 573,100 0 5,731,000
3-35-R2 RehllbRl!atlon of Magnolia Trunk Sawer 90% 10% 48,888,000 43,981,200 4,888,800 0 48,888,000
3-45 T1111k Branch of the Haover-Wesfem SUb!runk 90% 10% 1,410,000 75% 317,250 35,250 0 352,500
3-52 RehabRffallcn of lhe Westside Pump Station 90% 10% 2,991,000 2,691,900 299,100 0 2,991,000
3-55 Weslslde Relief lnten:eptor/ Los Alam!f.as MH Rehab 90% 10% 17,138,000 75% 3,855,800 428,400 0 4,284,000
3-58 RehabBlfatlan of the Seat Beach and Edinger PS 90% 10% 8,574,000 7,718,800 857,400 0 8,574,000
5-29-R1 Lln!ngof36• NPTB FM (June. Box to 2nd Angle Pl.) 90% 10% 1,998,000 1,796,400 199,600 0 1,998,000
548 Replacement of Back Bay Trunk Sewer 90% 10% 7,189,000 8,470,100 718,900 0 7,189,000
5-47 Balboa Trunk Sewer RehabRlfatlan 90% 10% 5,769,000 5,183,100 575,900 0 5,769,000
5-49 Replacement of lho Bitter Point Pump SIBl:lan 90% 10% 8,159,000 10% 8,808,790 734,310 0 7,343,100
5-50 Replacement of lhe Rocky Potnl Pump Station 90% 10% 9,382,000 10% 7,583,220 842,580 0 8,425,800
5-51 Rehabllllatlon of lhe 14th Sln!let Pump SIBtlon 90% 10% 4,617,000 4,155,300 481,700 0 4,817,000
5-52 RehabPlfatlan of lhe •A• Streel Pump Statlan 90% 10% 5,013,000 4,511,700 501,300 0 5,013,000
5-53 RehabHltaflan of fhe Bay Brldae Pump Slatlan 90% 10% 2,812,000 10% 2,115,720 235,080 0 2.350,800
5-54 RehabHltaflon of lho Ctysml Cove Pump Slalfon 90% 10% 1,512,000 1,360,800 151,200 0 1,512,000
5-58 PCH FM B!Her Pl Pe To Coast Trunk@ 8 lwnd & PCH 90% 10% 13,927,000 12,534,300 1,392,700 0 13,927,000
5-59 Bia Canyon Trunk Sewer Rehab & Replacement 90% 10% 2,534,000 2,280,800 253,400 0 2,534,000
8-13 Aband. of AB Trunk. Walson and Cal. 8ewet'a 90% 10% 351,000 315,900 35,100 0 351,000
8-13-3 Abandonment of AJ.rbase Trunk Sewer -Callfomta SI 90% 10% 975,000 877,500 97,500 0 975,000
8-18 Abandonment of AJ.rbase Trunk (Watson St) & College 90% 10% 3,278,000 2,948,400 327,800 0 3,276,000
7-7-2 Modltlcallona lo lhe Main S!reel Pump Station 90% 10% 969,000 872,100 98,900 0 969,000
7-14-4 Covsy lane Pump Station Abandonment 90% 10% 153,000 137,700 15,300 0 153,000
7-21 Sunflower lnlan:eptor Manhole Rehab. 90% 10% 3,991,000 3,591,900 399,100 0 3,991,000
7-32-1 Giiier Red HPI Trunk Sawer Relocallon -Phase 1 90% 10% 938,000 842,400 93,800 0 938,000
7-37 Glsler-Redhlll System lmpravemenls, Resch B 90% 10% 8,893,000 50% 3,101,850 344,850 0 3,448,500
7-47 Replacement of the College Ava. Pump Sta1lan 90% 10% 6,021,000 30% 3,793,230 421,470 0 4,214,700
7-49 RehabH!Jaflan of fhe MaeArthur Pump Slalton 90% 10% 2,355,000 10% 1,907,550 211,950 0 2,119,500
H:\dept\f!n\210\STREED\Excel\old d copy\STRATPLN\VCIP by flcMI, bod, 11 2003 FAHR.xr. VCIP leu capacily
9/2912004 Validated Cspltal Improvement Program Page2of5
Allocatfon to Flow, BOD and SS Less Cspaclty Projeds
A B c D E F G H
Haw Cspaclly Total Alloca!ed T01al Allocated Total Allocated Total Allocated
ProJ!!:! Tllf• Flaw BOD TSS To1al thru 2020 Percentage of Non Capacity CIP Non Capacity CIP Non Capacity CIP Non Capacity CIP
Cost Flaw BOD SS Total Allocated
7-58 Tustin Wat/lemon Helahts Trunk Improvements 90% 10% 5,928,000 50% 2,888,700 298,300 0 2,963,000
7-57 Lower Giiier-Redhill Tnink RelocetJan and MH Rehab 90% 10% 8,815,000 25% 4,485,125 498,125 0 4,981,250
7-58 Giiier Redhlll Trunk lmpnsv. & Orange Trunk lmprav 90% 10% 23,581,000 50% 10,802,450 1,178,050 0 11,780,500
7-59 Upper Glsler-Redhlll MH Rehablllfallon & campus Dr 90% 10% 2.121.000 1,908,900 212,100 0 2,121,000
11-14-R Newland 811881 Interceptor Sewer Protecflon 90% 10% 127,000 114,300 12,700 0 127,000
11-22 warner Avenue Relief Sewer 90% 10% 7,480,000 75% 1,883,000 187,000 0 1,870,000
11-25 EdlngerlBolsa Chica Trunk Improvements 90% 10% 2,128,000 75% 478,350 53,150 0 531,500
11-28 Coast Trunk Sewer Rehabl!ltafton 90% 10% 18,835,000 14,971,500 1,883,500 0 18,835,000
FE-Collec::I Facllffles Englneerfiv Pmjedl -Collecflans 90% 10% 5,400,000 4,860,000 540,000 0 5,400,000
1-2-4 Bushard Trunk Sewer RehabHifaflon 90% 10% 39,393,000 35,453,700 3,939,300 0 39,393,000
1-10 Replacement of the Ellls Ave. Pump Stn 90% 10% 33,837,000 90% 3,045,330 338,370 0 3,383,700
SP-95 Pump Slaflon P&IDs and Equipment Taaafng 90% 10% 720.000 848,000 72,000 0 720,000
CollectloM Facllltlee Total 574,845,155 322.984.025 35,887,114 0 358,871.139
Welghtl!ld Ave11199 Allocstlon 90% 10% 0%
P1-82 Sunflower Drlvlt Replacement 75% 5% 20% 815,000 811,250 40,750 183,000 815,000
P1-71 HeadwDfb RehabllllatlonlReflntllshment 75% 5% 20% 37,510,000 28,132,500 1,875,500 7,502,000 37,510,000
P2-88 HMcfworlca Improvements at Plant No. 2 75% 6% 20% 228.130,000 189,597,500 11,308,500 45,228,000 228, 130,0QO
J-83 PLC Programming and lntegra!lcn 75% 5% 20% 515,000 388,250 25,750 103,000 515,000
Headworb Total 284,970,000 198, 727,500 13,248,500 52,994,000 284,970,0QQ
P1-37 Prt. Clarfflens 18-31 & Relaf8d FacllWes 30% 70% 88,581,000 100% 0 0 0 0
P2-80 Prfmaiy Treatment RehablRefl.ub 30% 70% 55,093,000 0 18,527,900 38,585,100 55,093,000
SP-70 Sludge Density Meter Upamdes 30% 70% 800,000 0 240,000 580,000 800,000
P2-85 Cln:ular Clarffler Drlve Rep!ammenl/Upamde 30% 70% 3,487.000 0 1,040,100 2,428,900 3,487,000
Primary Traatrnant Total 147,921.000 0 17,808,000 41,552,000 59,380,000
P2-74 Seconcfaiy Plant RehabRltatlon 93% 7% 20,474,000 0 19,037,083 1,438,937 20,474,000
p2-47-3 Sec. TIU!. Manlfarlng & Cntrt Sys. Upgrade 93% 7% 8,703,000 0 8,092,193 810,807 8,703,000
P1-78 TrlcklfnG Fiiier RehabBltatlon and New Clarfflera 93% 7% 48,210,000 33% 0 28,787,no 2,172,930 30,980,700
P1-82 AdlvBIBd Sludge Plant Rehabilitation 93% 7% 23,870,000 25% 0 18,848,040 1,258,480 17,902,500
SP-72 Oxypn Plant AeplacemenllRehab!lltaflCln Assessment 93% 7% 2,145,000 0 1,994,458 150,544 2,145,000
SP-74 Adhmlad Sludge Aemtlon Basin Selector Sludy 93% 7% 945,000 0 878,877 88,323 945,000
SP-91 Computer Modeling of Adlvar.ed Sludge System 93% 7% 120,000 0 111,578 8,422 120,000
P1-102 New aecondaiy trea1ment system at Plant No. 1 93% 7% 251,100,000 80% 0 93,390,771 7,049,229 100,440,000
P2·90 New Trtddlna Fllte19 93% 7% 128,727,000 80% 0 47,878,998 3,813,804 51,490.800
Secondary Treatment Total 482,294.000 0 218,815,544 18,385,455 233,181,000
SP-38 Sludge Grinder Replacement 20% 80% 224,000 0 44,800 179,200 224,000
P2-80 Solids Storage and Truck Loading Feclllly 45% 55% 14,582,000 20% 0 5,249,520 8,418,080 11,885,800
SP-30-2 Hl;h Rale Digester Mix Pumps Mech. Seala 25% 75% 517,000 0 129,250 387,750 517,000
SP-79 Tute Ranch Ma!nfanance/Blosollds Management Needs 45% 55% 200,000 0 90,000 110,000 200,000
P1-99 Dlgftltera, Centrtruge/Presa & cake Stomge Hopper 25% 75% 61,805,000 80% 0 3,080,250 9,240,760 12,321,000
P2-89 D!geslera and Slucfae cake Hoppe111 at Plant 2 25% 75% 42,325,000 80% 0 2,118,250 8,348,750 8,485,000
P2-92 S!tdge Dewalerfng and Odor mntml at Plant 2 20% 80% 79,082,000 0 15,818,400 83,285,800 79,082,000
P2-91 Digester RehabBl!atlon at Plant 2 25% 75% 25,821,000 0 8,405,250 19,215,750 25,821,000
PMOO Sludae Digester Rehabilltdon at Plant 1 25% 75% 30,223,000 0 7,555,750 22,887,250 30,223,000
P1-101 Sludge Dewaterfna and Odor control at Plant 1 20% 80% 82,905,000 0 12,581,000 50,324,000 82,905,000
P1-B8 Ammonll!I Side SIJMm Treatment 100% 18,800,000 100% 0 0 0 0
H:\depl\fln\210\STREED\Excel\old d m~TRATPLN\VCIP by flcM. bod, a 2003 FAHR.xta VCIP lea capacity
912912004 Validated Cspltal Improvement Program Page3of5
Allocatfon lo Flow, BOD and SS Lesa Cspaci1y Projecl&
A B c D E F G __ H
New C8paclly Total Alloaded Total Allocated Total Allacaled Total Allocated
Pro.I!!:!_ Tit!• FICM' BOD TSS Total thru 2020 Percentage of Non Capacity CIP Non Capaclly CIP Non Capaclly CIP Non Capacity CIP
Coll Flaw BOD SS Total Allocaled
Sallcr. Handling & Digestion Total 335,884,000 0 53,088,410 178, U;~, 130 231,223,800
H:\depl\f!n\210\STREED\Excel\old d copy\STRATPLN\VCIP by fla#, bod, a 2003 FAHR.xla VCIP less capacity
9/29/2004 Validated Capital Improvement Program Page4of5
Allocatfon to Flow, BOD and SS less Cspaclly Projects
A B c D E F G H
NIM' Cspacfty Tutsi Alloca18d Talal Allocaf8d Talal Allocated Tatlll Allocafad
Pro~ Tit!• Flow BOD TS8 Total llvu 2020 Petmn111ge of Nan Capacity CIP Non CApaclty CIP Nan Capacity CIP Non Capacity CIP
Cost Flow BOD SS Total Allocated
J-77 Eftluent Pumping St.allon Annex 100% 50,757,000 50% 25,378,500 0 0 25,378,500
.HJ7 Peak Fluw Manaaement 100% 11,257,000 100% 0 0 0 0
SP-88 NPDES Permit Renewal 100% 1,512,000 1,512,000 0 0 1,512,000
J.87 Short Tenn Ou1fall Bacteria A8ducllcn 100% 7,578,000 7,578,000 0 0 7,578,000
Ocean Outfall Syetame Total 71,104,000 34,488,500 0 0 34,488,500
J-47 Cable Tray Improvements at Planls 1 & 2 29,528,000 0 0 0 0
P2-79 Gas Compressor Addition.al Planl No. 2 4,328,000 0 0 0 0
J.~5 Etec. Power System Slngle-llne Dlagnlms 3,388,000 0 0 0 0
J.33-1A Standby Power and Rellablllly Madiftc:atlcna 17,843,000 0 0 0 0
P2-82 Ulll!lles Rehabllllaflon and Refurbishment 4,929,000 0 0 0 0
J.79 Central Genemtlon Automation 8,038,000 0 0 0 0
SP-81 Eledr1cal Equipment Refurbishment and Prafacllon 3,312,000 0 0 0 0
SP-93 lndaortOutdccr Lighting Sludy 132,000 0 0 0 0
P1-97 Plant 1 66kV SUbstatlon 4,845,000 50% 0 0 0 0
SP-92 Rehabllltaflcn cf Law Pressure Gas Holder 422,000 0 0 0 0
P2-87 Fuel Slatlon Replacement at Plant No. 2 3,231,000 0 0 0 0
SP-94 Plant 1 Plant Wafar VFD Replacement 2,334,000 0 0 0 0
J-92 Area Class!ftcatlcn Sb.Idles lmplementatlcn Plan 211283,000 50% 0 0 0 0
Utility Syetame Total 103, 189,000 0 0 0 0
J-71-3 Feci!ltle.s Modlftcs!lons for Oder Central 4,127,000 0 0 0 0
J-71-8 RehabB!latlcn cf Odor Central Facll!Uea 33,224.000 0 0 0 0
Odor Control Related ProJecta Total 37,3511000 0 0 0 0
J.42 Plant Reinvention I Au!omaflcn Projec:I 21,915,000 0 0 0 0
SP-01 DoaJment Management 884,000 0 0 0 0
SP-02 Dais lnfegmflcn 4,334,000 0 0 0 0
SP-13 Soun:e Ccnln>I Progmmmlng 2,958,000 0 0 0 0
SP-03 Slra!eglc Information Ardlltectunt (SIA) 724,000 0 0 0 0
SP-15 Geographic lnformatlcn System 4,157,000 0 0 0 0
J-33-3 Power Monltotlna and Control Sysr.ems 3,790,000 0 0 0 0
SP-09 ln1emetllntranel Dewlopmenl 850,000 0 0 0 0
SP-81 SCADA System Replacement Study 300,000 25% 0 0 0 0
SP-82 SCADA Gnlphlcs Tagging Updata 425,000 0 0 0 0
SP-84 FISUpgmde 3,213,000 0 0 0 0
SP-85 lnfonna!lon Tec:hnology Dlsaltar Aecclveiy 332,000 0 0 0 0
SP-89 Network Equipment upgmde 2,801,000 0 0 0 0
SP·100 CMMS System Replacement 31789,000 25% 0 0 0 0
Plant Automation & Computerization Total 50,350,000 0 0 0 0
SP-53 Plant O&M Manual & SOP Pru)ed -Phase I 4,000,000 0 0 0 0
SP-54 Hazardous Energy Control Proceduras 1,190,000 0 0 0 0
J.44-R Standard Speclllcatlans Revisions and Updalel 857,000 0 0 0 0
SP-88-1 Ccrmslan Management 7,548,000 0 0 0 0
SP-90-8 Special Projeda: Ammanla Redudlcn Op!lona 2n,ooo 100% 0 0 0 0
SP-B0-1 Special Prujeds: Anaxlc Ga Flafaflon (AGF) 798,000 0 0 0 0
SP·B0-7 Special Projedl: Blolrtcldlng FRter (BTF, 328,000 0 0 0 0
SP·90-2 Special Prujeds: Anaerobic Baf'rled Reactor (ABR) 514.000 0 0 0 0
SP·B0-8 Special Projecll: Dewafarfna Opllonl Ccmparfson 99.000 0 0 0 0
H:\depl\fln\21C\STREED\Excel\old d ccpy\STRATPLN\VCIP by flow, bod, u 2003 FAHR.xla VCIP less capacfly
9/29/2004 Validated Capital Improvement Program Page5of5
Allocation to Flaw, BOD and SS Less Capacity Projects
A B c D E F G H
Haw capacity Total Allocatad Total Allocatad Total Allocated Tctal Allocated
PraJ!!:! Tiii• Flow BOD TSS Tc1al ltuu 2020 Permnfage cf Ncn Capacffy CIP Ncn Capacity CIP Non Capaclly CIP Non Capaclly CIP
Coll Flaw BOD SS Total Allocaled
SP-90-5 Spoc:lal Projeds: MlaoffitmtlonlPrtmmy Effluent 4,095,000 50% 0 0 0 0
SP-90-4 Spec:lal Pro)ecU: Oxygen lonlzallon I Odor Canrrol 210,000 0 0 0 0
SP-90-3 Specfal Projeds: Pr1maiy Eflluent Fl!lratlon 470,000 0 0 0 0
J..94 Eftluent Pathagen Reductlan Allematlves Plan 1,549,000 0 0 0 0
Proceu Relat.ed Special Projecta Total 21,735,000 0 0 0 0
J.82 MocflffcaBons to Exlsllng Mech. Systems 3,007,000 0 0 0 0
FE-J Faclllllea Englneertng Pro.feds • Jolnl 18,200,000 0 0 0 0
FE-P2 Fsclllllea Englneertna Projeds -Plant 2 18,200,000 0 0 0 0
FE-P1 Facl!Hles Englneertng Pro.feds • Plant 1 18,200,000 0 0 0 0
J-69 Blllldlng Rehabil!laflon/Refurblshment 1,455,000 0 0 0 0
SP-34 Small Csp. Equ!p. Repl8cement Project 3,000,000 0 0 0 0
SP-08 Securfty Sya1em lmpl'DVements 1,100,000 0 0 0 0
SP-88-2 Asset Management Prugmm 16,555,000 0 0 0 0
SP-77 Warahouse Reinvention Project 800,000 0 0 0 0
J-25-8 lntertm Fae Rec:crd & Eng Oala Syst Malnt SelVlces 628,000 0 0 0 0
SP·85 Plume Modellng 377,000 0 0 0 0
J-40-5 SUpplement No. 1 to the 1999 Slrataglc Plan EIR 832,000 0 0 0 0
J-40-7 Long Range Blosallds Management Plan 2,833,000 0 0 0 0
J-40-9 Slnl!aafc Plan Updtlt8 3,419,000 25% 0 0 0 0
J-84 Space Allocaflon and Inferior Renavallan 18,388,000 0 0 0 0
J-88 LabomlDry RehabUltatlon 1,829,000 0 0 0 0
J-89 Tenant lmprowmenll to RebuDd Shop 321,000 0 0 0 0
J-40-10 Supplemental Full Secondary Treatment CEQA Doc. 425,000 15% 0 0 0 0
J-90 Englneerfna Tl'Bller Complex 2,006,000 0 0 0 0
P1-103 SUpport Building Pawer Sys!em Modifications 2,751,000 0 0 0 0
SP-98 Plant 2 Malnlllnanc:e BuUdlng Modlflc:a!lons 300,000 0 0 0 0
Mlllcellaneom & Support Project8 Total 112,428,000 0 0 0 0
J-38 Gnwndwaler Replenishment System 100% 238,208,000 84% 85,034,180 0 0 85,034,160
J-72 Water ConservaUon 100% 4,644,000 100% 0 0 0 0
J-73 Co-op Pro.feds, lnt1awnnt1lt. Reduction 0 100% 0 0 0 0
J-7~2 Long Term Permanent Manl!Drtng Prugn1m 100% 2.852,000 100% 0 0 0 0
Water Management Projecta Total 243, 702,000 85,034,180 0 0 85,034,160
Dlsbtda Cepltsl Equipment Budget 59,092,000 25% 0 0 0 0
Dletrfcta Capital Equipment Budget 69,092,000 0 0 0 0
Traatrnent & Dlsposal Total 1,930,018,000 318,230, 160 300,940,514 289,068,588 908,237,280
Weighted Average Allocatlon 31% 33% 32%
Combined Total CIP 2,504,663, 155 841,214,185 338.827,628 289,068,588 1,287, 108,399
Combined Weighted Average Allocatlon For COPa 80% 27% 23%
H:\depl\f!n\210\STREED\Excel\old d ccpy\STRATPLN\VCIP by flCNI, bod, a 2003 FAHR.xls VCIP lea capacity
9/29/2004
Expense and Cost Allocations
For Permit User Fee Calculations
A: From 1999 Strategic Plan Befora Adjmtlng to BOD & SS
Flow
BOD
SS
Collection Collection
O&M CIP
100°,,{, 100%
Joint
O&M
13%
40%
47%
Joint
CIP
82%
28%
12%
Total
CIP
89%
22%
9%
B: From 1999 Strategic Plan and Rate Advisory Committee After Shift
Collectlon Colledlon Joint Joint Total
O&M CIP O&M CIP CIP
Flow 100% 90% 13% 27% 44%
BOD 10% 40% 39% 32%
SS 47°,,{, 44% 24%
C: Used for Adopted Permit User Rates, Based Upon RAC
Colledlon Collection Joint Joint Total
O&M CIP O&M CIP CIP
Flow 100% 100% 13% 44%
BOD 40% 32%
SS 47% 24%
COP
SeNlce
COP
Se Nice
COP
Se Nice
D: September FAHR, From 2003 Valldated Capltal Improvement Plan & 2003-04 Actual
Colledlon Colledion Joint Joint Total COP
O&M CIP O&M CIP CIP Se Nice
Flow 100% 90% 12% 33% 49% 49%
BOD 10% 34% 39% 31% 31%
SS 54% 28% 20% 20%
E: Proposed, From 2003 Validated Capital Improvement Plan .__ Capacity CIP
Collection Collection Joint Joint Total COP
O&M CIP O&M CIP CIP SeNlce
Flow 50% 90% 12% 35% 50% 50%
BOD 10% 34% 33% 27% 27%
SS 50% 54% 32% 23% 23%
H:\dept\fln\210\STREEO\Excel\Permlt Users\SC Alloc History.xis
LAW OFFICES OF
WOODRUFF, SPRADLIN & SMART
A PROFESSIONAL CORPORATION
MEMORANDUM
TO: Chair and Members of Board of Directors
Orange County Sanitation District
FROM: General Counsel
DATE: October 20, 2004
RE: Proposed Ordinance No. OCSD-24 re
Permittee Charges for Use
The General Manager and Director of Finance have provided to you, under
separate cover, a detailed Agenda Report setting forth the various studies undertaken
by your Staff to arrive at the proposed schedule of revised fees for Permit Users. The
report was most recently presented in a revised fashion to the FAHR Committee on
October 13, 2004 and was recommended to the Board for adoption.
The Board of Directors first considered this recommendation from the Staff at its
meeting of July 21, 2004, which was convened so as to include a public comment
portion of the hearing on the Ordinance pursuant to notice provided by the District's
Staff to the approximate 500 Permit Users in the District. After considerable discussion
and the objection by representatives of two Permit Users, the Board introduced and
passed to a second reading the proposed Ordinance, but the public portion of the
hearing was held open to allow for further public comment at the August 25, 2004 Board
Meeting.
At the August 25th meeting, the Staff requested that the matter be continued
further to allow additional study and evaluation of the fees, and to allow for further
exchange of information with the affected Permit Users. The Board of Directors
approved the request, and again kept the public comment portion of the Ordinance
hearing open, and directed that the matter be heard at the regularly-scheduled October
meeting of the Board of Directors.
As a result of the comments by the public, both at Board Meetings and in
meetings with the Staff, together with comments and recommendations from Directors,
the Staff has made further revisions and evaluation to the Ordinance, and has
presented them to the Board for consideration at this time. Your Agenda item contains
two copies of Table G, which is the only portion of the Ordinance being amended. One
copy is "redlined" to show the change in the rates from the amounts relating to Flow,
BOD, and SS in the original Ordinance as introduced in July, and the amounts now
recommended after further study. The second copy is simply the "clean" version,
showing the newly-revised rates only.
mda
October 20, 2004
Page2
Because the rates have changed significantly from the first reading, it is my
advice that the Ordinance be given a new first reading and introduction and that the
public comment period on that first reading be held at this meeting, in light of the fact
that all interested parties have been given notice of the meeting and have indicated, in
all probability, that they will appear at the Board hearing to testify. The second reading
would then be conducted at the regularly-scheduled Board Meeting of November 17,
2004, and if the recommendation of the Staff is approved by the Board, the Ordinance
would be adopted with an effective date of January 1, 2005.
As this hearing will be the new first reading of the Ordinance, the Board is
empowered to make any changes to the Staff recommendation that it deems warranted
or appropriate. Those can be done at the conclusion of the public portion of the hearing
at this meeting and before the motion to introduce is adopted.
TLW:pj
cc: Mr. B.P. Anderson
Mr. G.G. Streed
Ms. P. Kyle
Enda
THOMAS L. WOODRUFF
GENERAL COUNSEL
ORDINANCE NO. OCSD-24
ADOPTING REVISED TABLE G RE PERMITTEE CHARGES FOR USE
AND REAFFIRMING ALL OTHER CHARGES
AN ORDINANCE OF THE BOARD OF DIRECTORS OF ORANGE
COUNTY SANITATION DISTRICT ESTABLISHING SANITARY SEWER
SERVICE CHARGES; ESTABLISHING CAPITAL FACILITIES
CAPACITY CHARGES; ADOPTING MISCELLANEOUS CHARGES AND
FEES RELATING TO INDUSTRIAL CHARGES, SOURCE CONTROL
PERMITTEES AND WASTEHAULERS; AND REPEALING ORDINANCE
NO. OCSD-22.
WHEREAS, the Board of Directors of the Orange County Sanitation
District ("District") has previously adopted Ordinance No. OCSD-22, establishing
annual Sanitary Sewer Service Charges for all uses, establishing Capital
Facilities Capacity Charges to be imposed when properties either newly-connect
to the District's system, or expand the use of the property previously connected
to the District; establishing miscellaneous industrial discharger fees, source
control/non-compliance sampling fees, and wastehauler charges, which
Ordinance is presently in full force and effect; and
WHEREAS, for purposes of improved efficiency and effectiveness of the
District's operations, it is the intent, by the adoption of this Ordinance, to re-enact
the existing Ordinance that establishes sanitary sewer service charges and
capital facilities fees, and to provide for increases in certain miscellaneous
charges and fees.
NOW, THEREFORE, the Board of Directors of the Orange County
Sanitation District does hereby ORDAIN:
Section I. Fees and Charges Ordinance -Adopted
TABLE OF CONTENTS
ARTICLE I: RECITAL OF FINDINGS
Section 1.01, Findings -Declaration of Intent
ARTICLE II: SANITARY SEWER SERVICE CHARGES
Section 2.01, Purpose and Scope
Section 2.02, Annual Sanitary Sewer Service Charge
(First page of proposed ordinance only)
TABLEG
CLASS I AND CLASS II PERMITTEES AND
SPECIAL PURPOSE DISCHARGE PERMITTEES
CHARGES FOR USE
Class I and II
Permit User FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07
Flow(*) $316.38 $577.30 $637.55 $711.27
B.O.D. (**) $216.13 $270.68 $288.50 $311.21
S.S.(***) $207.35 $414.27 $432.14 $454.19
Domestic
Equivalent $100.00 $115.00 $132.00 $153.00
SQecial PurQose
Discharge
Permit
Flow(*)
B.O.D. (**)
S.S. (***)
Domestic
Equivalent
(*) Flow
(**) 8.0.D.
(***)S.S.
FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07
$316.38 $577.30 $637.55 $711.27
$216.13 $270.68 $288.50 $311.21
$207.35 $414.27 $432.14 $454.19
$100.00 $115.00 $132.00 $153.00
Per million gallons of Flow
Per thousand pounds of Biochemical Oxygen Demand
Per thousand pounds of Suspended Solids
FY 2007-08
$773.32
$330.53
$473.50
$175.00
FY 2007-08
$773.32
$330.53
$473.50
$175.00
All properties located within Revenue Area No. 14 pay no annual service fees. District costs
relating to providing service to these properties are billed by OCSD directly to the Irvine Ranch
Water District, the local agency providing the local sewer service.
REVISED TABLE-10127104
TABLEG
CLASS I AND CLASS II PERMITTEES AND
SPECIAL PURPOSE DISCHARGE PERMITTEES
CHARGES FOR USE
Class I and II Estimated Estimated
Permit User FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07
Flow(*) $316.38 $577.30 $637.55 $711.27
$500.20 $564.42 $697.94
8.0.D. (**) $216.13 $270.68 $288.50 $311.21
$29B.B9 $337.47 $404.32
S.S.(***) $207.35 $414.27 $432.14 $454.19
$275.47 $312.10 $37Q.94
Domestic
Equivalent $100.00 $115.00 $132.00 $153.00
SQecial PurQose
Discharge
Permit
Flow(*)
8.0.D. (**)
S.S.(***)
Domestic
Equivalent
(*) Flow
(**) 8.0.D.
(***)S.S.
FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07
$316.38 $577.30 $637.55 $711.27
$§QQ.2Q $564.42 $997.94
$216.13 $270.68 $288.50 $311.21
$296.89 $337.47 $404.32
$207.35 $414.27 $432.14 $454.19
$275.47 $312.16 $37Q.94
$100.00 $115.00 $132.00 $153.00
Per million gallons of Flow
Per thousand pounds of Biochemical Oxygen Demand
Per thousand pounds of Suspended Solids
Estimated
FY 2007-08
$773.32
$785.31
$330.53
$455.46
$473.50
$419.61
$175.00
FY 2007-08
$773.32
$785.31
$330.53
$455.46
$473.50
$419.61
$175.00
All properties located within Revenue Area No. 14 pay no annual service fees. District costs
relating to providing service to these properties are billed by OCSD directly to the Irvine Ranch
Water District, the local agency providing the local sewer service.
BOARD OF DIRECTORS Meeting Date To Bd. of Dir.
10/27/04
AGENDA REPORT Item Number Item Number
18
Orange County Sanitation D1stnct
FROM: David Ludwin, Director of Engineering
. Originator: Hardat Khublall, CIP Project Manager
SUBJECT: EMERGENCY REPAIR OF THE SANTA ANA RIVER INTERCEPTOR
BETWEEN ORANGE/RIVERSIDSE COUNTY LINE AND SAVI RANCH .
GENERAL MANAGER'S RECOMMENDATION
Ratify the use of the General Manager's emergency purchasing authority pursuant to
Resolution No. OCSD 04-08, to take actions necessary for the Emergency Repair of the
Santa Ana River Interceptor, Contract No . 2-41-3 , in an amount not to exceed
$350,000.
SUMMARY
Background
• Significant erosion of the SARI pipeline soil cover within the Santa Ana River
Floodplain has occurred over the years. While in the process of developing CEQA
documentation to support the best alternative for the relocation or protection of the
SARI pipeline, the District continues to annually monitor the pipeline at critical areas
after each rainy season.
• The District recently completed its annual 2004 topographic field survey and
compared it with the 2003 survey. The results of the analysis indicated significant
erosion had occurred over the last rainy season in two areas along the pipeline
leaving just over one foot of cover in one area and about two feet of cover in another
area.
• District staff has analyzed the extent of the erosion in these two areas and
determined that the inadequate amount of cover in these two areas presents a
condition of which could result in catastrophic failure during the winter months .
• This budget is to facilitate the design and construction of the emergency repairs.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
Revised: 06/04/03 Page 1
PROJECT/CONTRACT COST SUMMARY
Authorization of $350,000 from the District operating expenses for FY 2004-2005.
BUDGET IMPACT
D This item has been budgeted.
D This item has been budgeted, but there are insufficient funds .
IZI This item has not been budgeted.
D Not applicable (information item)
ADDITIONAL INFORMATION
A discussion to take actions necessary for the Emergency Repair of the Santa Ana
River Interceptor took place between the District's Board Chair (Steve Anderson) and
the District's Acting General Manager (Robert Ghirelli) on September 28 , 2004. In
addition, the three District Board Committees were informed of this discussion during
the respective October meeting cycles. Informing the appropriate parties was done
pursuant to Resolution No. OCSD 04-08 which stipulates that the General Manager or
his designee, shall advise the District Chair and/or Vice Chair, as appropriate, of the
action taken , and such action shall be ratified by the Board of Directors at its next
regular meeting.
ALTERNATIVES
No alternatives are proposed .
CEQA FINDINGS
A notice of exemption w i ll be filed per Article 15359 Emergency Repairs.
AITACHMENTS
None
HK:
Revis ed : 06/04 /03 Page 2